WorldWideScience

Sample records for future plan shogyo

  1. Future planning - utopia

    International Nuclear Information System (INIS)

    Boernke, F.

    1978-01-01

    Our life develops as the anticipation of future. Everything we wish, hope, plan and carry out and think is or should be related to future and will have its effects in future. The certainty may spread that it is a necessary obligation to learn to find out our actual being more clearly to be able to develop a thinking and acting that is directed to future that has also a total of responsability as its essence. We will later atone for the failed outlooks into future or for only moderate or uncompleted starts of planning. For this reason we should consider that future does not come for its own, not without our demands, not without our acting. Only if our reflection and aspiration, thinking and acting is done with moderate and circumspect sense in the right way it will be a good fundamental for the future. (orig.) [de

  2. Future land use plan

    International Nuclear Information System (INIS)

    1995-01-01

    The US Department of Energy's (DOE) changing mission, coupled with the need to apply appropriate cleanup standards for current and future environmental restoration, prompted the need for a process to determine preferred Future Land Uses for DOE-owned sites. DOE began the ''Future Land Use'' initiative in 1994 to ensure that its cleanup efforts reflect the surrounding communities' interests in future land use. This plan presents the results of a study of stakeholder-preferred future land uses for the Brookhaven National Laboratory (BNL), located in central Long Island, New York. The plan gives the Laboratory's view of its future development over the next 20 years, as well as land uses preferred by the community were BNL ever to cease operations as a national laboratory (the post-BNL scenario). The plan provides an overview of the physical features of the site including its history, topography, geology/hydrogeology, biological inventory, floodplains, wetlands, climate, and atmosphere. Utility systems and current environmental operations are described including waste management, waste water treatment, hazardous waste management, refuse disposal and ground water management. To complement the physical descriptions of the site, demographics are discussed, including overviews of the surrounding areas, laboratory population, and economic and non-economic impacts

  3. Future land use plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-31

    The US Department of Energy`s (DOE) changing mission, coupled with the need to apply appropriate cleanup standards for current and future environmental restoration, prompted the need for a process to determine preferred Future Land Uses for DOE-owned sites. DOE began the ``Future Land Use`` initiative in 1994 to ensure that its cleanup efforts reflect the surrounding communities` interests in future land use. This plan presents the results of a study of stakeholder-preferred future land uses for the Brookhaven National Laboratory (BNL), located in central Long Island, New York. The plan gives the Laboratory`s view of its future development over the next 20 years, as well as land uses preferred by the community were BNL ever to cease operations as a national laboratory (the post-BNL scenario). The plan provides an overview of the physical features of the site including its history, topography, geology/hydrogeology, biological inventory, floodplains, wetlands, climate, and atmosphere. Utility systems and current environmental operations are described including waste management, waste water treatment, hazardous waste management, refuse disposal and ground water management. To complement the physical descriptions of the site, demographics are discussed, including overviews of the surrounding areas, laboratory population, and economic and non-economic impacts.

  4. Future planning in preschool children.

    Science.gov (United States)

    Moffett, Lillie; Moll, Henrike; FitzGibbon, Lily

    2018-05-01

    The capacity to plan ahead and provide the means for future ends is an important part of human practical reasoning. When this capacity develops in ontogeny is the matter of an ongoing debate. In this study, 4- and 5-year-olds performed a future planning task in which they had to create the means (a picture of a particular object, e.g., a banana) that was necessary to address a future end (of completing a game in which such a picture was missing). Children of both ages drew more targets than children in a control condition in which there was no future end to be pursued. Along with prior findings, the results suggest a major progression in children's future thinking between 3 and 5 years. Our findings expand on prior knowledge by showing that young children cannot only identify the probate means to future ends but determine such ends and create the means to achieve them, thus offering compelling evidence for future planning. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  5. Strategic Planning: Shaping Future Success

    Science.gov (United States)

    2016-09-01

    fielding, the PM may also be planning for future increments , sustainment and other long-term ef- forts. Strategic planning can help the PM position these...introduced the Planning, Programming, and Budgeting System (PPBS) to the DoD. Prior to that, the DoD’s budget - ing focused on areas such as overhead

  6. The Future of Electricity Resource Planning

    Energy Technology Data Exchange (ETDEWEB)

    Kahrl, Fredrich [Energy and Environmental Economics, Inc., San Francisco, CA (United States); Mills, Andrew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Lavin, Luke [Energy and Environmental Economics, Inc., San Francisco, CA (United States); Ryan, Nancy [Energy and Environmental Economics, Inc., San Francisco, CA (United States); Olsen, Arne [Energy and Environmental Economics, Inc., San Francisco, CA (United States); Schwartz, Lisa [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2016-09-14

    Electricity resource planning is the process of identifying longer-term investments to meet electricity reliability requirements and public policy goals at a reasonable cost. Resource planning processes provide a forum for regulators, electric utilities, and electricity industry stakeholders to evaluate the economic, environmental, and social benefits and costs of different investment options. By facilitating a discussion on future goals, challenges and strategies, resource planning processes often play an important role in shaping utility business decisions. Resource planning emerged more than three decades ago in an era of transition, where declining electricity demand and rising costs spurred fundamental changes in electricity industry regulation and structure. Despite significant changes in the industry, resource planning continues to play an important role in supporting investment decision making. Over the next two decades, the electricity industry will again undergo a period of transition, driven by technological change, shifting customer preferences and public policy goals. This transition will bring about a gradual paradigm shift in resource planning, requiring changes in scope, approaches and methods. Even as it changes, resource planning will continue to be a central feature of the electricity industry. Its functions — ensuring the reliability of high voltage (“bulk”) power systems, enabling oversight of regulated utilities and facilitating low-cost compliance with public policy goals — are likely to grow in importance as the electricity industry enters a new period of technological, economic and regulatory change. This report examines the future of electricity resource planning in the context of a changing electricity industry. The report examines emerging issues and evolving practices in five key areas that will shape the future of resource planning: (1) central-scale generation, (2) distributed generation, (3) demand-side resources, (4

  7. Effective Planning of the Future of the Arctic

    Science.gov (United States)

    Sentsov, A.; Bolsunovskaya, Yu; Bolsunovskaya, L.

    2014-08-01

    The problems of the Arctic region have become the most important ones in the world. Political risks hinder the industrial development of the region. This paper addresses the problem of planning and modeling the future of this region. It presents the problems of developing a model of the future due to the ideologies and strategies of two main actors in the Arctic, the United States and the Russian Federation. The effects of a bipolar perception of the future of the region and of the whole world are shown. A model of the effective planning of the future of the Arctic region is proposed.

  8. Foundation for the Future. 2013-2015 Strategic Plan. FY13 Organizational Performance Plan

    Science.gov (United States)

    2013-01-01

    Strengths, Weaknesses, Opportunities, and Threats ( SWOT ) Analysis 192013–2015 Strategic Plan tr t ic l The Planning, Policy, and Leadership Support (PPLS...and public cloud mix Conduct government/private market survey to determine future cloud strategy Implement future cloud strategy  Thin Client...Systems Acquisition Reform Act of 2009, National Security Strategy , and the Digital Government Strategy • Department of Defense, as set forth in the

  9. Scenario planning and nanotechnological futures

    International Nuclear Information System (INIS)

    Farber, Darryl; Lakhtakia, Akhlesh

    2009-01-01

    Scenario planning may assist us in harnessing the benefits of nanotechnology and managing the associated risks for the good of the society. Scenario planning is a way to describe the present state of the world and develop several hypotheses about the future of the world, thereby enabling discussions about how the world ought to be. Scenario planning thus is not only a tool for learning and foresight, but also for leadership. Informed decision making by experts and political leaders becomes possible, while simultaneously allaying the public's perception of the risks of new and emerging technologies such as nanotechnology. Two scenarios of the societal impact of nanotechnology are the mixed-signals scenario and the confluence scenario. Technoscientists have major roles to play in both scenarios.

  10. Using Human Capital Planning to Predict Future Talent Needs

    Science.gov (United States)

    Ruse, Donald; Jansen, Karen

    2008-01-01

    Human capital planning is an important tool in predicting future talent needs and sustaining organizational excellence over the long term. This article examines the concept of human capital planning and outlines how institutions can use HCP to identify the type and number of talent needed both now and in the future, recognize and prioritize talent…

  11. The future of hydropower planning modeling

    Science.gov (United States)

    Haas, J.; Zuñiga, D.; Nowak, W.; Olivares, M. A.; Castelletti, A.; Thilmant, A.

    2017-12-01

    Planning the investment and operation of hydropower plants with optimization tools dates back to the 1970s. The focus used to be solely on the provision of energy. However, advances in computational capacity and solving algorithms, dynamic markets, expansion of renewable sources, and a better understanding of hydropower environmental impacts have recently led to the development of novel planning approaches. In this work, we provide a review, systematization, and trend analysis of these approaches. Further, through interviews with experts, we outline the future of hydropower planning modeling and identify the gaps towards it. We classified the found models along environmental, economic, multipurpose and technical criteria. Environmental interactions include hydropeaking mitigation, water quality protection and limiting greenhouse gas emissions from reservoirs. Economic and regulatory criteria consider uncertainties of fossil fuel prices and relicensing of water rights and power purchase agreements. Multipurpose considerations account for irrigation, tourism, flood protection and drinking water. Recently included technical details account for sedimentation in reservoirs and variable efficiencies of turbines. Additional operational considerations relate to hydrological aspects such as dynamic reservoir inflows, water losses, and climate change. Although many of the above criteria have been addressed in detail on a project-to-project basis, models remain overly simplistic for planning large power fleets. Future hydropower planning tools are expected to improve the representation of the water-energy nexus, including environmental and multipurpose criteria. Further, they will concentrate on identifying new sources of operational flexibility (e.g. through installing additional turbines and pumps) for integrating renewable energy. The operational detail will increase, potentially emphasizing variable efficiencies, storage capacity losses due to sedimentation, and the

  12. Physics Teachers' Future Teaching Plans

    Science.gov (United States)

    Physics Teacher, 2012

    2012-01-01

    There are two sides of the physics teacher turnover equation: teachers leaving and teachers entering. This month we will focus on teachers' future teaching plans. As seen in the figure, about 5% of the 27,000 teachers who taught physics in U.S. high schools in 2008-09 were in their first year of teaching physics (but not necessarily their first…

  13. Space station evolution: Planning for the future

    Science.gov (United States)

    Diaz, Alphonso V.; Askins, Barbara S.

    1987-06-01

    The need for permanently manned presence in space has been recognized by the United States and its international partners for many years. The development of this capability was delayed due to the concurrent recognition that reusable earth-to-orbit transportation was also needed and should be developed first. While the decision to go ahead with a permanently manned Space Station was on hold, requirements for the use of the Station were accumulating as ground-based research and the data from unmanned spacecraft sparked the imagination of both scientists and entrepreneurs. Thus, by the time of the Space Station implementation decision in the early 1980's, a variety of disciplines, with a variety of requirements, needed to be accommodated on one Space Station. Additional future requirements could be forecast for advanced missions that were still in the early planning stages. The logical response was the development of a multi-purpose Space Station with the ability to evolve on-orbit to new capabilities as required by user needs and national or international decisions, i.e., to build an evolutionary Space Station. Planning for evolution is conducted in parallel with the design and development of the baseline Space Station. Evolution planning is a strategic management process to facilitate change and protect future decisions. The objective is not to forecast the future, but to understand the future options and the implications of these on today's decisions. The major actions required now are: (1) the incorporation of evolution provisions (hooks and scars) in the baseline Space Station; and (2) the initiation of an evolution advanced development program.

  14. Space station evolution: Planning for the future

    Science.gov (United States)

    Diaz, Alphonso V.; Askins, Barbara S.

    1987-01-01

    The need for permanently manned presence in space has been recognized by the United States and its international partners for many years. The development of this capability was delayed due to the concurrent recognition that reusable earth-to-orbit transportation was also needed and should be developed first. While the decision to go ahead with a permanently manned Space Station was on hold, requirements for the use of the Station were accumulating as ground-based research and the data from unmanned spacecraft sparked the imagination of both scientists and entrepreneurs. Thus, by the time of the Space Station implementation decision in the early 1980's, a variety of disciplines, with a variety of requirements, needed to be accommodated on one Space Station. Additional future requirements could be forecast for advanced missions that were still in the early planning stages. The logical response was the development of a multi-purpose Space Station with the ability to evolve on-orbit to new capabilities as required by user needs and national or international decisions, i.e., to build an evolutionary Space Station. Planning for evolution is conducted in parallel with the design and development of the baseline Space Station. Evolution planning is a strategic management process to facilitate change and protect future decisions. The objective is not to forecast the future, but to understand the future options and the implications of these on today's decisions. The major actions required now are: (1) the incorporation of evolution provisions (hooks and scars) in the baseline Space Station; and (2) the initiation of an evolution advanced development program.

  15. Time orientation, planning horizons and responsibility into the future

    International Nuclear Information System (INIS)

    Svenson, O.; Nilsson, G.

    1988-01-01

    Subjects of four categories (social science students, engineering students, retired people and nuclear waste experts) were asked about past events, planning, risks and future time with emphasis on energy related issues and in particular questions concerning spent nuclear waste. Among, the results reported it was found that events in the past were located more or less correctly and that events further back systematically too close to the present. Today's responsibility into the future was judged to cover 3 to 6 generations ahead and an adequate planning horizon for a local community to be on the average 11 to 14 years. Adequate planning horizons for the handling of spent nuclear fuel were judged to be from 100 to 500 years. The responsibility for effects of today's decisions was judged to be from about 100 to 300 years into the future for environmental pollution and from about 50 to 600 years for nuclear waste. However, non-negliqable proportions of the subjects choose a more moral standpoint and gave answers indicating that responsibility had to be unlimited. Some sex differences were found and an interaction with age offered as a hypothesis to be investigated in the future. Interrelations between clusters of questions revealed some links from past time and planning to judgements of environmental and nuclear power related risks. (orig.)

  16. ANSTO's future plans for nuclear science and technology

    International Nuclear Information System (INIS)

    Blackburne, I.

    2003-01-01

    There are four key themes in ANSTO's future plans for nuclear science and technology: 1) ANSTO plans for the future - within its established 'core business areas', following a rigorous process, and incorporating extensive interaction with organisations around Australia and overseas. 2) The replacement research reactor (RRR) - a Major National Research Facility and the cornerstone of ANSTO's future activities. 3) A number of business development initiatives that have been launched by ANSTO over the past year, under the banner of Good science is good business at ANSTO. 4) ANSTO involvement in the national research priorities that the Prime Minister announced last December, in particular, by pursuing new research in the security and forensics area; its contribution to the 'Safeguarding Australia' national research priority. The Replacement Research Reactor now under construction will make an enormous difference to the work that ANSTO can undertake, and that others can perform using ANSTO's facilities

  17. Planning for a Nondriving Future: Behaviors and Beliefs Among Middle-Aged and Older Drivers.

    Science.gov (United States)

    Harmon, Annie C; Babulal, Ganesh; Vivoda, Jonathon M; Zikmund-Fisher, Brian J; Carr, David B

    2018-01-01

    Despite the reality of older adults living many years after driving cessation, few prepare for the eventuality; empirically, planning for a nondriving future has not been directly quantified or explored. The following study quantifies 1) the extent of current drivers' planning, 2) specific planning behaviors, 3) beliefs about benefits of planning, 4) drivers' intention to plan more for future transportation needs, and 5) group differences associated with planning. In a predominantly female, black, urban sample of current drivers ages 53-92, fewer than half (42.1%) had planned at all for a nondriving future, with correspondingly low levels of planning behaviors reported. However, over 80% believed planning would help them meet their needs post-cessation and transition emotionally to being a nondriver. Most (85%) intended to plan more in the future as well, indicating further potential openness to the topic. Drivers who planned were older, drove less frequently, limited their driving to nearby places, reported less difficulty believing they would become a nondriver, and expected to continue driving three years less than non-planners. These findings suggest that drivers' perceived nearness to driving cessation impacts planning for future transportation needs, and existing perceived benefits of planning may provide leverage to motivate action.

  18. Future Plans for the ACORNE Collaboration

    International Nuclear Information System (INIS)

    Thompson, Lee F

    2007-01-01

    A summary of the future plans for ACORNE collaboration are presented. Of particular note is the intended development of an acoustic calibrator to be deployed in the deep sea above the Rona hydrophone array. Crucial to this goal is work recently completed on the understanding of hydrophone response and the generation of bipolar acoustic signals; this work is presented in detail

  19. WIN Chapters: Milestones and Future Plans

    Energy Technology Data Exchange (ETDEWEB)

    Castro, P.; Pelegrí, M.

    2015-07-01

    In this paper the WIN Chapters: milestones and future plans are presented. WIN-IAEA has rewarded-in the three last years - to Australia-2014, South-Africa-2013 and Sweden-2012. WIN-Global -specially WiN IAEA- can collaborate a lot with the CTBTO presenting the content of the Treaty on the Non-Proliferation of Nuclear Weapons actually increasing the signatory members in 2015. Historical decisions on NTP are already affecting WiN IAEA. The research reactors or high flux reactors are important in the field of medical applications and other future applications. In Australia women-scientist of OPAL, can become WiN. Between the OPAL applications there is a production of silicon plates to be used in laptops/mobiles. WIN-Europe activities related with the climatic change and with the academic promotion. 2015 is also a very important year due the celebration of 20th Anniversary of WIN-Spain; plans of this Chapter and Conferences of WIN-Global are presented. In addition there are women working in ITER, in some activities in the EU, China, India, Japan, South Korea, USA and Russia both in the academic (R+D) field and into the Industry. (Author)

  20. Weather, climate and the future : B.C.'s plan

    International Nuclear Information System (INIS)

    2004-12-01

    This plan lays the groundwork for a comprehensive long-term response to climate change in British Columbia (BC). Three key objectives were identified: decreasing greenhouse gas (GHG) emissions and reducing vulnerability to future climate change; contributing to BC's economic revitalization by improving energy efficiency and supporting development of market opportunities; and ensuring BC's interests are protected in the implementation of national climate policies. A summary of actions was provided in the areas of sustainable energy production and sustainable forest management. Outlines of the government's plans to provide support to the BC Agriculture Council were also provided along with plans concerning infrastructure and the ways in which climate change will be incorporated into transportation planning and investment strategies. A list of government leadership and outreach actions was given, as well as details of water management plans. It was concluded that further policy developments will be required in incremental forest sinks, energy efficiency, bioenergy and fuel cell technology. Improved urban development and performance targets are necessary for public buildings. It was noted that regulatory changes to provide further incentives in these areas are necessary. Partnerships between the private sector, federal, local and regional governments will be essential for the future success of this plan. tabs., figs

  1. Demographic Analysis and Planning for the Future. No. 13.

    Science.gov (United States)

    Efird, Cathy M.

    The basic sources and types of demographic data available for future planning for the developmentally disabled are reviewed and a frame work for data organization is suggested. It is explained that future forecasts may be undertaken by the following principles: trend forecasting or extrapolation; scenario construction; models, games, and…

  2. FFTF-cycle 10 program and future plan

    Science.gov (United States)

    Kohyama, Akira

    1988-04-01

    Brief outlines are provided of the FFTF cycle 10 program and future plans in consideration. The primary objective of the Japan-US collaboration program is to enable predictions of material behavior in MFRs to be made from data obtained in other irradiation environments. Major program goals are outlined.

  3. Planning Schools for the Future. Publication No. BM-1.

    Science.gov (United States)

    Weinberger, JoAnn

    In a three-year study, Research for Better Schools (RBS) was asked by the National Institute of Education to identify, analyze, and verify definitive social changes forecast for the decades ahead, and to project their implications for schools of the future. RBS reviewed the literature to extract future planning needs relevant to educational…

  4. Energy future Santa Cruz: A citizens' plan for energy self-reliance

    Science.gov (United States)

    Cohn, J.; Stayton, R.

    The results of a grassroots energy conservation project which involved more than 3,100 residents of Santa Cruz, California, is discussed. Citizens attended forums and town meetings to suggest ideas for solving the community's energy problems. These ideas were then evaluated by the Energy Future Advisory Board and compiled into the Energy Future Plan. The energy plan covers such topics as new residences, residential retrofit, automobile efficiency, farm efficiency, commercial greenhouses, local food production, commercial efficiency, land use planning, energy education and financing, and solar, wind, and ocean energy. An energy implementation guide and glossary are included.

  5. Optimism and Planning for Future Care Needs among Older Adults

    Science.gov (United States)

    Sörensen, Silvia; Hirsch, Jameson K.; Lyness, Jeffrey M.

    2015-01-01

    Aging is associated with an increase in need for assistance. Preparation for future care (PFC) is related to improved coping ability as well as better mental and physical health outcomes among older adults. We examined the association of optimism with components of PFC among older adults. We also explored race differences in the relationship between optimism and PFC. In Study 1, multiple regression showed that optimism was positively related to concrete planning. In Study 2, optimism was related to gathering information. An exploratory analysis combining the samples yielded a race interaction: For Whites higher optimism, but for Blacks lower optimism was associated with more planning. High optimism may be a barrier to future planning in certain social and cultural contexts. PMID:26045699

  6. FutureTDM Communication and Exploitation Plan

    OpenAIRE

    Frew, Helen

    2016-01-01

    This report is designed to meet the overall objective of FutureTDM – to identify and remove TDM uptake barriers in the EU through an effective and sustainable communications strategy. It sets out a strategy to engage, to inform (showing our expertise), to be accessible and to be relevant now and post project end date. The plan explains how we are going to communicate the project, offering options both on‐line and in person, with user friendly language and a recognisable slogan...

  7. Planning for the Future, a Look from Apollo to the Present

    Science.gov (United States)

    Segrera, David

    2008-01-01

    Future missions out of low Earth orbit, returning to the moon and Mars, will be some of the most complicated endeavors ever attempted by mankind. It will require the wealth of nations and the dedicated efforts of thousand of individuals working in a concerted effort to take man to the moon, Mars and beyond. These missions will require new equipment and new approaches to optimize our limited resources and time in space. This daily planning and optimization which currently is being performed by scores of people in MCC Houston and around the world will need to adapt to the challenges faced far from Earth. By studying the processes, methodologies, and tools employed from Apollo, Skylab, Shuttle, ISS, and other programs such as NEEMO, we can learn from the past to plan for the future. This paper will explore the planning process used from Apollo onward and will discuss their relevancy in future applications.

  8. Urban Planning for a Renewable Energy Future: Methodological Challenges and Opportunities from a Design Perspective

    NARCIS (Netherlands)

    Vandevijvere, H.; Stremke, S.

    2012-01-01

    Urban planning for a renewable energy future requires the collaboration of different disciplines both in research and practice. In the present article, the planning of a renewable energy future is approached from a designer’s perspective. A framework for analysis of the planning questions at hand is

  9. Requirements for advanced decision support tools in future distribution network planning

    NARCIS (Netherlands)

    Grond, M.O.W.; Morren, J.; Slootweg, J.G.

    2013-01-01

    This paper describes the need and requirements for advanced decision support tools in future network planning from a distribution network operator perspective. The existing tools will no longer be satisfactory for future application due to present developments in the electricity sector that increase

  10. Water planning in a changing climate: how do you plan for a future when the past no longer represents the future?

    International Nuclear Information System (INIS)

    Yuen, Emma

    2007-01-01

    Full text: Full text: By 2030, the catchments across south-west Western Australia can expect decreases in runoff ranging from 5% to 40% relative to 1990. This has ramifications, not only for consumptive and non-consumptive uses, but for the way decisions are made in an environment of uncertainty. Traditionally, water planning has assumed a static environment whereby statistically defensible climatic records have been used in decision-making. While climate modelling may provide projections of plausible climatic futures, this needs to be integrated with socio-political and economic futures when considering the environment in which regional water plans will apply. Where climate change is slow, enabling biophysical and social systems have time to adapt to long-term water resources planning needs that incorporate principles of intergenerational equity, the precautionary principle and resilience in management strategies. However where changes in climate are poorly recognised against the background of inherent climate variability or where step changes in rainfall occur or threshold assimilative levels of ecosystems are exceeded, conflict and uncertainty challenge the decisionmaking processes. Within the backdrop of climate change, the Department of Water is developing a Regional Water Plan for the southwest which will set the strategic direction on water resources for the next 25 years. In order to move forward with this process, the water sector must undergo a number of transformations: from linear science to complex dynamic systems thinking; from 'decide and defend'to increased community engagement when dealing with both complexity and uncertainty; from conservation of 'museum pieces' to innovation, partnerships and adaptive management. This paper will discuss the philosophy behind the decision-making framework based on experiences from business management and other sectors. It will also discuss an action research process that could be used in the South West Water Plan

  11. Physics and planning for future colliders

    International Nuclear Information System (INIS)

    Kane, G.L.

    1985-01-01

    Physics opportunities at future (not presently under construction) colliders are examined, particularly with reference to the motivations for building them. First a number of considerations involved in planning and choosing beams, energies, and luminosities are discussed. Higgs physics, which currently seems to be the central problem of particle physics, is emphasized, with detailed study of how to do WW scattering and how to detect effects of heavy Higgs bosons. Some new results are included. High energy hadron colliders dominate the discussion, but alternatives are examined for comparison and when they have unique capabilities

  12. Energy future Santa Cruz. A citizens plan for energy self-reliance: Executive summary

    Science.gov (United States)

    Cohn, J.; Stayton, R.

    A grassroots energy conservation project which involved more than 3100 residents of Santa Cruz, California, is discussed. Citizens attended forums and town meetings to suggest ideas for solving the community's energy problems. These ideas were then evaluated by the Energy Future Advisory Board and compiled into the Energy Future Plan. The plan covers such topics as new residences, residential retrofit, automobile efficiency, farm efficiency, commercial greenhouses, local food production, commercial efficiency, land use planning, energy eduction and financing, and solar, wind, and ocean energy. If the plan is successfully implemented, the energy that the community is projected to use in 1991 can be lowered by 24 to 35 percent.

  13. Identifying the Correlates and Barriers of Future Planning among Parents of Individuals with Intellectual and Developmental Disabilities

    Science.gov (United States)

    Burke, Meghan; Arnold, Catherine; Owen, Aleksa

    2018-01-01

    Although individuals with intellectual and developmental disabilities (IDD) are living longer lives, fewer than half of parents of individuals with IDD conduct future planning. The correlates and barriers to future planning must be identified to develop targeted interventions to facilitate future planning. In this study, 388 parents of individuals…

  14. 75 FR 55776 - Request for Comments on Vaccine Production and Additional Planning for Future Possible Pandemic...

    Science.gov (United States)

    2010-09-14

    ... Production and Additional Planning for Future Possible Pandemic Influenza AGENCY: International Trade... additional planning for future possible pandemic influenza. DATES: Written comments must be submitted on or... influenza pandemic (see World Health Organization announcement of August 10, 2010) and the need to plan for...

  15. Fontan Surgical Planning: Previous Accomplishments, Current Challenges, and Future Directions.

    Science.gov (United States)

    Trusty, Phillip M; Slesnick, Timothy C; Wei, Zhenglun Alan; Rossignac, Jarek; Kanter, Kirk R; Fogel, Mark A; Yoganathan, Ajit P

    2018-04-01

    The ultimate goal of Fontan surgical planning is to provide additional insights into the clinical decision-making process. In its current state, surgical planning offers an accurate hemodynamic assessment of the pre-operative condition, provides anatomical constraints for potential surgical options, and produces decent post-operative predictions if boundary conditions are similar enough between the pre-operative and post-operative states. Moving forward, validation with post-operative data is a necessary step in order to assess the accuracy of surgical planning and determine which methodological improvements are needed. Future efforts to automate the surgical planning process will reduce the individual expertise needed and encourage use in the clinic by clinicians. As post-operative physiologic predictions improve, Fontan surgical planning will become an more effective tool to accurately model patient-specific hemodynamics.

  16. Succession Planning and Management: The Backbone of the Radiology Group's Future.

    Science.gov (United States)

    Donner, E Michael; Gridley, Daniel; Ulreich, Sidney; Bluth, Edward I

    2017-01-01

    The transition of leadership within radiology practices is often not a planned replacement process with formal development of potential future leaders. To ensure their ongoing success, however, practices need to develop comprehensive succession plans that include a robust developmental program for potential leaders consisting of mentoring, coaching, structured socialization, 360-degree feedback, developmental stretch assignments, job rotation, and formal education. Succession planning and leadership development will be necessary in the future for a practice to be successful in its business relationships and to be financially viable. Copyright © 2016 American College of Radiology. Published by Elsevier Inc. All rights reserved.

  17. How Do High School Seniors See Their Future? Parental and Peer Influences on Their Personal and Professional Plans

    Directory of Open Access Journals (Sweden)

    Iovu Mihai-Bogdan

    2014-07-01

    Full Text Available Statement of problem: Future orientation is a multidimensional and multistage phenomenon. Studies have indicated that how adolescents anticipate and plan for their future is greatly influenced by the particular context in which they are placed, but most of the research in this area has been conducted with adolescents from western cultures. Aim: This study examined the personal (getting married, moving with the partner, having a child and professional (having a job, starting a business future planning of adolescents in contemporary Romania and its relation with adolescents’ background and with parents and friends support. Method: We administered a questionnaire measuring their future orientation and support from parents and friends to 3524 high school seniors from Romania. Results: Adolescents’ personal future planning varies across different life domains. Females were more likely to plan moving with the partner and getting married, while males were more likely to plan a career option. Family had an effect on professional plans, but the effect is negative, while friends were positive associated with all the future planning

  18. Learning from the Past, Planning for the Future...

    Directory of Open Access Journals (Sweden)

    Blanche Cameron

    2013-02-01

    Full Text Available Ever since the National Planning Policy Framework hove into view, it has been polarising opinions, either for or against this most radical shake up of UK planning policy since just after the Second World War. Suddenly, what was a highly (some say over complex system of thousands of pages of detailed planning guidance has been simplified to a 58 page document, which has been through a year of consultation before coming into law. It is interesting to consider how the NPPF is now being viewed and applied in different contexts. Flatman and Perring’s paper explores the potential (positive and negative impacts of the NPPF on archaeological practice, in terms of conservation, but also in social and cultural terms – the fear being that, without the proper requirements in place, archaeological evidence may at best be conserved, but without sufficient capacity to research, understand and integrate its meaning for us and our future.

  19. Planning for a Better Future: California 2025. 2011 Update

    Science.gov (United States)

    Public Policy Institute of California, 2011

    2011-01-01

    California's current economic and fiscal realities make nonpartisan, objective information on the state's future challenges all the more critical. Understandably, the search is on for immediate solutions to the unprecedented crises people face today. But if the present crises make policymakers shelve long-term planning, the result may be an even…

  20. Are the Planning of the Sustainable Future to be left for the chemical engineers?

    DEFF Research Database (Denmark)

    Elle, Morten

    1997-01-01

    The paper discuss the need for new ways of planning and managing the environment. Traditional spatial planning has been reduced to a question of putting colours on maps, there are a need for the planning to restrengthen it's position and gain a future in the planning of the city of tomorrow....

  1. Developing a vision and strategic action plan for future community-based residency training.

    Science.gov (United States)

    Skelton, Jann B; Owen, James A

    2016-01-01

    The Community Pharmacy Residency Program (CPRP) Planning Committee convened to develop a vision and a strategic action plan for the advancement of community pharmacy residency training. Aligned with the profession's efforts to achieve provider status and expand access to care, the Future Vision and Action Plan for Community-based Residency Training will provide guidance, direction, and a strategic action plan for community-based residency training to ensure that the future needs of community-based pharmacist practitioners are met. National thought leaders, selected because of their leadership in pharmacy practice, academia, and residency training, served on the planning committee. The committee conducted a series of conference calls and an in-person strategic planning meeting held on January 13-14, 2015. Outcomes from the discussions were supplemented with related information from the literature. Results of a survey of CPRP directors and preceptors also informed the planning process. The vision and strategic action plan for community-based residency training is intended to advance training to meet the emerging needs of patients in communities that are served by the pharmacy profession. The group anticipated the advanced skills required of pharmacists serving as community-based pharmacist practitioners and the likely education, training and competencies required by future residency graduates in order to deliver these services. The vision reflects a transformation of community residency training, from CPRPs to community-based residency training, and embodies the concept that residency training should be primarily focused on training the individual pharmacist practitioner based on the needs of patients served within the community, and not on the physical location where pharmacy services are provided. The development of a vision statement, core values statements, and strategic action plan will provide support, guidance, and direction to the profession of pharmacy to

  2. The planning of future research program of underground laboratories in overseas

    International Nuclear Information System (INIS)

    Honma, Nobuyuki; Tanai, Kenji; Hasegawa, Hiroshi

    2002-02-01

    The objectives of this study is to identify the research issues, which are to be conducted in the future underground research laboratory, about operation and logistics systems for the planning of future research and development program. The research programs and experiments, etc. were investigated for the geological disposal projects in overseas sedimentary rocks and coastal geological environments aiming to reflect in the future underground research facility plan in Japan. In the investigation, information on the engineered-barrier performance, design and construction of underground facilities, tunnel support, transportation and emplacement, and backfilling technology, etc. were collected. Based on these informations, the purpose, the content, and the result of each investigations and tests were arranged. The strategy and the aim in the entire underground research facility, and the flow of investigations and tests, etc. were also arranged from the purpose, the relations and the sequence of each investigation and experiment, and the usage of results, etc. (author)

  3. Status and future plan of nuclear data activities in China

    Energy Technology Data Exchange (ETDEWEB)

    Zhuang Youxiang; Tang Hongqing [Academia Sinica, Beijing, BJ (China). Inst. of Atomic Energy

    1997-03-01

    The present status and future plan of nuclear data measurement and evaluation in China are presented, including the supplement, improvement on CENDL-2.1 and benchmark test of CENDL-2.1, the progress on nuclear data measurement and CENDL-3. (author)

  4. Future plans on the Kyoto University Research Reactor (KUR)

    International Nuclear Information System (INIS)

    Shibata, Seiichi

    2000-01-01

    The Research Reactor Institute (RRI), Kyoto University, for aiming at performing the 'Experiments using a reactor and its related research', was established in Showa 38 (1963) as a cooperative research institute for universities and so on in allover Japan. Operation using KUR of one of main facilities in RRI was started by 1 MW of its rated output in 1964, and converted to 5 MW in 1968, after which through development , addition and modification of various research apparatus it has been proposed to the cooperative application researches with universities and so on in allover Japan, hitherto. Among these periods, its research organization is improved to six departments containing twenty divisions and two attached research facilities to progress some investigations on future plans at RRI for response to new researching trends. Here were described on present state of research on use of low concentrated uranium fuels at research reactor, and future plans on neutron factory and hybrid reactor. The former aims at establishment of a new research facility capable of alternating to KUR for future academic research on research reactor containing high quality and high degree application of neutron field and safety management and feature upgrading of nuclear energy. And, the latter aims at development on an accelerator drive uncritical reactor combined an accelerator neutron source and an uncritical reactor. (G.K.)

  5. Corporate strategy and viable future land use: Planning for closure from the outset of mining

    International Nuclear Information System (INIS)

    Warhurst, A.

    2000-01-01

    This paper provides an overview of the environmental impact of mining on viable future land use and underlines the imperative of improved environmental management and closure planning. It argues that pollution prevention, through planning for closure, can lead to cost-effective strategies for sustainable minerals development and viable future land use. This seems to be most true for greenfield sites since, generally, the earlier closure planning and pollution prevention is built into a project, the more cost-effective and environmentally benign closure will be. Further, for greenfield sites, pollution prevention techniques can be employed from the outset, at the stages of exploration and mine development, and then monitored and improved through the operation stage to closure, and can be kept in place to manage future land use. The paper discusses how global changes in the industry, following the liberalisation of investment regimes, and mergers and strategic alliances between key firms, has, by virtue of the diffusion of new technology, led to further opportunities to prevent pollution and optimise future land use through planning for closure from the outset. The objectives and components of closure plans are also reviewed as the paper draws on case studies to highlight some of the possible constraints and challenges to pollution prevention that may be faced at the level of both public policy and corporate strategy. The article concludes by suggesting a forward-looking approach to integrated environmental management and viable future land-use planning based on a dynamic model for environmental management. (author)

  6. Regional Planning, Local Visions : Participatory Futuring in West Africa

    OpenAIRE

    Peter Easton

    2000-01-01

    The note examines regional planning, and future participatory methods for economic development in West Africa, based on the work carried out by the Club du Sahel - a branch of the Organization for Economic Cooperation and Development (OECD) - responsible for coordinating northern donor agencies, in support of food security, and natural resource management in the desert-edge portions of Wes...

  7. Automatic Scheduling and Planning (ASAP) in future ground control systems

    Science.gov (United States)

    Matlin, Sam

    1988-01-01

    This report describes two complementary approaches to the problem of space mission planning and scheduling. The first is an Expert System or Knowledge-Based System for automatically resolving most of the activity conflicts in a candidate plan. The second is an Interactive Graphics Decision Aid to assist the operator in manually resolving the residual conflicts which are beyond the scope of the Expert System. The two system designs are consistent with future ground control station activity requirements, support activity timing constraints, resource limits and activity priority guidelines.

  8. GammeV: results and future plans at Fermilab

    Energy Technology Data Exchange (ETDEWEB)

    Wester, William; /Fermilab

    2010-05-01

    GammeV is an axion-like particle photo regeneration experiment that employs the light shining through a wall technique. We obtain limits on the coupling of a photon to an axion-like particle that extend previous limits for both scalar and pseudoscalar particles in the milli-eV mass range. We have reconfigured our apparatus to search for chameleon particles. We describe the current results and future plans for similar activities at Fermilab.

  9. Air Force Strategic Planning: Past, Present, and Future

    Science.gov (United States)

    2017-01-01

    Raphael S. Cohen Air Force Strategic Planning Past, Present, and Future C O R P O R A T I O N Limited Print and Electronic Distribution Rights This... intelligence , surveillance, and reconnaissance QDR Quadrennial Defense Review TAC Tactical Air Command UAV unmanned aerial vehicles 1 1...Ithaca, N.Y.: Cornell University Press, 2000, p. 258. 5 U.S. Government Printing Office, Army Air Forces Field Manual: Employment of Aviation of the

  10. Career destinations, views and future plans of the UK medical qualifiers of 1988.

    Science.gov (United States)

    Taylor, Kathryn; Lambert, Trevor; Goldacre, Michael

    2010-01-01

    To report the career destinations, views and future plans of a cohort of senior doctors who qualified in the 1980s. Postal questionnaire survey of all doctors who qualified from all UK medical schools in 1988. The response rate was 69%. We estimated that 81% of the total cohort was working in the NHS, 16 years after qualification; and that at least 94% of graduates who, when students, were from UK homes, were working in medicine. Of NHS doctors, 30% worked part-time. NHS doctors rated their job satisfaction highly (median score 19.9, scale 5-25) but were less satisfied with the amount of leisure time available to them (median score 5.4, scale 1-10). NHS doctors were very positive about their careers, but were less positive about working hours and some other aspects of the NHS. Women were more positive than men about working conditions; general practitioners were more positive than hospital doctors. Twenty-five percent reported unmet needs for further training or career-related advice, particularly about career development. Twenty-nine percent intended to reduce their hours in future, while 6%, mainly part-time women, planned to increase their hours. Overall, 10% of NHS doctors planned to do more service work in future and 24% planned to do less; among part-time women, 18% planned to do more and only 14% less. These NHS doctors, now in their 40s, had a high level of satisfaction with their jobs and their careers but were less satisfied with some other aspects of their working environment. A substantial percentage had expectations about future career development and change.

  11. Ocean Studies Board annual report 1989 and future plans

    International Nuclear Information System (INIS)

    1990-01-01

    The major activities of the Ocean Studies Board of the National Research Council for 1989 are reviewed. The following are discussed: the Navy Panel, the CO2 Panel, the Committee on the Ocean's Role in Global Change, the Committee on the Coastal Ocean, the Workshop on Issues of U.S. Marine Fisheries, and the Continental Margins Workshop Committee. Future plans are covered

  12. MAD-X progress and future plans

    CERN Document Server

    Deniau, L

    2012-01-01

    The design efforts for the High Luminosity upgrade of the Large Hadron Collider (HL-LHC) will require significant extensions of the MAD-X code widely used for designing and simulating particles accelerators. These changes are framed into a global redesign of the MADX architecture meant to consolidate its structure, increase its robustness and flexibility, and improve its performance. Some examples of recent extensions to MAD-X like the RF-Multipole element will be presented. Improvement for models and algorithms selection providing better consistency of the results and a wider range of use will be discussed. The computation efficiency will also be addressed to profit better of modern technologies. In this paper, we will describe the last improvements and the future plans of the project.

  13. The Past, Present, and Future of Discharge Planning in Taiwan

    Directory of Open Access Journals (Sweden)

    Shu-Chuan Lin

    2013-06-01

    Full Text Available Discharge planning is an interdisciplinary approach to provide continuity of care; it is a process that includes identification, assessment, goal setting, planning, implementation, coordination, and evaluation. Discharge planning has been viewed as a major way to enhance a smooth transition for patients from the hospital to home or other chronic care units and as a solution to solve problems associated with postdischarge care. The promotion of discharge planning began in the United States in the 1960s. Nursing scholars from Taiwan learned about the concept of discharge planning from the United States in the early 1980s and subsequently introduced it to Taiwanese medical institutions in 1985. A policy to promote discharge planning in Taiwan was announced by the Executive Yuan, Department of Health in 1993. Following the healthcare reforms in 1995, discharge planning has since been strongly promoted. Studies concerning discharge planning in Taiwan showed some promising results, including increased satisfaction of patients and their families, improved preparation of caregivers, and improved quality of life for patients. However, patients receiving interdisciplinary discharge planning services were still in the minority. There was no standard evaluation procedure for interdisciplinary discharge planning, and a high percentage of patients thought that hospitals handled the postdischarge long-term care services referral procedure inadequately. Despite the positive attitudes toward discharge planning, many physicians still demonstrate an unsatisfactory level of knowledge and behaviors with regard to discharge planning. To enhance the implementation of discharge planning, a standard evaluation procedure for interdisciplinary discharge planning and improved physician awareness concerning the importance of discharge planning are needed. In Taiwan, the improvement of discharge planning in the foreseeable future is promising with the accreditation of the

  14. 77 FR 3635 - Connect America Fund; A National Broadband Plan for Our Future; Establishing Just and Reasonable...

    Science.gov (United States)

    2012-01-25

    ...-208; Report No. 2945] Connect America Fund; A National Broadband Plan for Our Future; Establishing Just and Reasonable Rates for Local Exchange Carriers; High-Cost Universal Service Support et al... applicability. Subject: Connect America Fund: A National Broadband Plan for Our Future; Establishing Just and...

  15. Monitoring plan and maintenance NPP the Vandellos I and future prospects

    International Nuclear Information System (INIS)

    Margalef Escoda, S.

    2013-01-01

    This paper intends to give to know the singularities of an installation phase of latency and your monitoring and maintenance plan. the horizons that has the installation medium-term to guide the future dismantling level 3 monitoring and maintenance activities are also described.

  16. Status and future plans for the LEP accelerator

    International Nuclear Information System (INIS)

    Placidi, M.

    1992-01-01

    An overview is given of the LEP performance in 1991 as compared to the goals defined in the design phase and the targets agreed with the physics experiments during the year. Achievements and limitations in the machine operation for physics in terms of beam current and luminosity are discussed and analyzed. Progress in beam polarization studies leading to improved energy calibration by the resonant depolarization technique are described. Finally, prospects and future plans to increase luminosity, to upgrade the energy and to implement polarization control are presented. (author)

  17. Examining the support needs of ageing family carers in developing future plans for a relative with an intellectual disability.

    Science.gov (United States)

    Taggart, Laurence; Truesdale-Kennedy, Maria; Ryan, Assumpta; McConkey, Roy

    2012-09-01

    Planning for the future care of adults with an intellectual disability after the main family carer ceases their care, continues to be a sensitive and difficult time posing challenges for service providers internationally. Limited research has been undertaken on this topic because until recently, people with intellectual disability usually pre-deceased their parents. This study examined ageing carers' preferences for future care and the support systems required to make such future plans. The study was conducted in one region of the United Kingdom with a high proportion of family carers. A mixed methods design was employed. In Stage 1, a structured questionnaire was used to collate information on the health, caregiving demands and future planning preferences of 112 parent and sibling carers; aged 60-94 years. In Stage 2, 19 in-depth semistructured interviews were undertaken with a sample of carers to explore a range of issues around future planning. Over half of the carers were lone carers, mainly female, with many reporting a wide range of health problems. A third of these carers reported that their caregiving resulted in high levels of anxiety. The main preference of the carers was for the person to remain in the family home, with either the family and/or paid staff to support them. A minority of parent carers preferred the person to move into the home of a sibling, although some favoured the person moving to a residential facility with other people with intellectual disabilities. The majority of carers did not want their relative to move into an older people's residential/nursing facility. In the qualitative data, four main themes were identified around future planning: unremitting apprehension, the extent of planning, obstacles encountered and solutions for future planning. Avoidance, lack of guidance and a lack of appropriate residential provision were cited as obstacles to making future plans compounded by the emotional upset experienced by carers in thinking

  18. ELearning Strategic Planning 2020: The Voice of Future Students as Stakeholders in Higher Education

    Science.gov (United States)

    Finger, Glenn; Smart, Vicky

    2013-01-01

    Most universities are undertaking information technology (IT) strategic planning. The development of those plans often includes the voices of academics and sometimes engages alumni and current students. However, few engage and acknowledge the voice of future students. This paper is situated within the "Griffith University 2020 Strategic…

  19. Status and Future Plans of JAERI Eergy-Recovery Linac FEL

    CERN Document Server

    Hajima, R; Kikuzawa, N; Minehara, E J; Nagai, R; Nishimori, N; Nishitani, T; Sawamura, M; Yamauchi, T

    2005-01-01

    An energy-recovery linac for a high-power free-electron laser is in operation at Japan Atomic Energy Research Institute (JAERI). In this paper, we report results of research activities and future plans of JAERI ERL-FEL, which are the construction of FEL transport line, the operation of newly-installed RF controller and IOTs, the development of super-lattice photo cathode.

  20. Planning for the future.

    Science.gov (United States)

    Stiewing, Janis

    2002-01-01

    Revising the strategic plan was the beginning of a multiyear initiative that will determine the path of the JRCERT. The key word in the preceding statement is beginning. The strategic plan is an ever-changing document. Although some components, such as the values statements, will stand over time, other components will change as accreditation and educational arenas change. That is the paradox of strategic planning: Remaining true to the vision, values and mission statements requires knowing when to change to keep the JRCERT aligned with the responsive to its communities of interest.

  1. An integrated model for long-term power generation planning toward future smart electricity systems

    International Nuclear Information System (INIS)

    Zhang, Qi; Mclellan, Benjamin C.; Tezuka, Tetsuo; Ishihara, Keiichi N.

    2013-01-01

    Highlights: • An integrated model for planning future smart electricity systems was developed. • The model consists of an optimization model and an hour-by-hour simulation model. • The model was applied to Tokyo area, Japan in light of the Fukushima Accident. • Paths to best generation mixes of smart electricity systems were obtained. • Detailed hourly operation patterns in smart electricity systems were obtained. - Abstract: In the present study, an integrated planning model was developed to find economically/environmentally optimized paths toward future smart electricity systems with high level penetration of intermittent renewable energy and new controllable electric devices at the supply and demand sides respectively for regional scale. The integrated model is used to (i) plan the best power generation and capacity mixes to meet future electricity demand subject to various constraints using an optimization model; (ii) obtain detailed operation patterns of power plants and new controllable electric devices using an hour-by-hour simulation model based on the obtained optimized power generation mix. As a case study, the model was applied to power generation planning in the Tokyo area, Japan, out to 2030 in light of the Fukushima Accident. The paths toward best generation mixes of smart electricity systems in 2030 based on fossil fuel, hydro power, nuclear and renewable energy were obtained and the feasibility of the integrated model was proven

  2. Realistic Goals and Processes for Future Space Astronomy Portfolio Planning

    Science.gov (United States)

    Morse, Jon

    2015-08-01

    It is generally recognized that international participation and coordination is highly valuable for maximizing the scientific impact of modern space science facilities, as well as for cost-sharing reasons. Indeed, all large space science missions, and most medium and small missions, are international, even if one country or space agency has a clear leadership role and bears most of the development costs. International coordination is a necessary aspect of future mission planning, but how that coordination is done remains debatable. I propose that the community's scientific vision is generally homogeneous enough to permit international coordination of decadal-scale strategic science goals. However, the timing and budget allocation/funding mechanisms of individual countries and/or space agencies are too disparate for effective long-term strategic portfolio planning via a single international process. Rather, I argue that coordinated space mission portfolio planning is a natural consequence of international collaboration on individual strategic missions. I review the process and outcomes of the U.S. 2010 decadal survey in astronomy & astrophysics from the perspective of a government official who helped craft the survey charter and transmitted guidance to the scientific community on behalf of a sponsoring agency (NASA), while continuing to manage the current portfolio that involved ongoing negotiations with other space agencies. I analyze the difficulties associated with projecting long-term budgets, obtaining realistic mission costs (including the additional cost burdens of international partnerships), and developing new (possibly transformational) technologies. Finally, I remark on the future role that privately funded space science missions can have in accomplishing international science community goals.

  3. Building on the past, planning for the future

    International Nuclear Information System (INIS)

    Woodall, D.M.

    1996-01-01

    A University Working Conference (UWC) sponsored by the American Nuclear Society (ANS) was held on June 14 and 15, 1996, prior to the ANS Annual Meeting in Reno, Nevada. With a theme of open-quotes Building on the Past, Planning for the Future,close quotes the meeting was the successor to the first UWC held in Philadelphia, Pennsylvania, in 1995. This workshop refined the recommendations to the national nuclear engineering academic community of the earlier UWC on strategies for success in the 21st century. This UWC had 40 attendees from academe and industry, and the program was developed around the outcomes of the Philadelphia meeting. The general chair of UWC96 was Don Miller of Ohio State University, while the author of this paper served as the technical program chair. Assistant technical program chairs included Madeline Feltus of Pennsylvania State University, Dan Bullen of Iowa State University, and Gilbert Brown of the University of Massachusetts Lowell. A working conference is often loosely structured, with an informal, flexible program, consisting of a few highlight or keynote presentations followed by workshop sessions devoted to a theme area. The workshop sessions at this meeting included the following: 1. strategic planning in today's climate; 2. university/industry research collaboration; 3. profiles of nuclear engineering and radiological engineering students, now and in the future; 4. accreditation issues, especially ABET's engineering 2000; 5. employment of nuclear and radiological engineers; 6. new program thrusts in nuclear engineering departments; 7. uses of new technology in the classroom and laboratory; 8. internet access to information for education; 9. distance education/remote delivery of curricula

  4. Positive futures? The impact of HIV infection on achieving health, wealth and future planning.

    Science.gov (United States)

    Harding, Richard; Molloy, Tim

    2008-05-01

    Although HIV is now cast as a chronic condition with favourable clinical outcomes under new treatments, it is unclear how living with HIV affects expectations and planning for the future. This mixed-methods study aimed to investigate UK gay men's expectations of their own future when living with HIV, and to identify the heath and social interventions required to enhance roles, participation and personal fulfilment. A preliminary focus group identified relevant domains of enquiry for a subsequent online cross-sectional survey. A total of 347 gay men living in the UK with HIV participated in the survey, and 56.6% were currently on treatment. However, high 7-day prevalence of psychological and physical symptoms was identified (42.6% in pain, 80.2% worrying); 57.8% perceived reduced career options due to their infection and 71.8% reduced life expectancy. Being on treatment was not significantly associated with perceived life expectancy. Coded open-ended survey data identified eight principle themes related to goal planning and attainment. The integrated open and closed data items offer an understanding of barriers and challenges that focus on poor mental health due to clinical inattention, discrimination and stigma, poor career and job opportunities due to benefit and workplace inflexibility and lack of understanding, a lack of personal goals and associated skills deficit related to confidence and self esteem. Gay men living with HIV require an integrated holistic approach to wellbeing that incorporates clinical, social and individual intervention in order to lead productive lives with maximum benefit from treatment gains.

  5. Planning future care services: Analyses of investments in Norwegian municipalities.

    Science.gov (United States)

    Hagen, Terje P; Tingvold, Laila

    2018-06-01

    To analyse whether the Norwegian Central Government's goal of subsidizing 12,000 places in nursing homes or sheltered housing using an earmarked grant was reached and to determine towards which group of users the planned investments were targeted. Data from the investment plans at municipal level were provided by the Norwegian Housing Bank and linked to variables describing the municipalities' financial situation as well as variables describing the local needs for services provided by Statistics Norway. Using regression analyses we estimated the associations between municipal characteristics and planned investments in total and by type of care place. The Norwegian Central Government reached its goal of giving subsidies to 12,000 new or rebuilt places in nursing homes and sheltered housing. A total of 54% of the subsidies (6878 places) were given to places in nursing homes. About 7500 places were available by the end of the planning period and the rest were under construction. About 50% of the places were planned for user groups aged Investments in nursing homes were correlated with the share of the population older than 80 years and investments in sheltered houses were correlated with the share of users with intellectual disabilities. Earmarked grants to municipalities can be adequate measures to affect local resource allocation and thereby stimulate investments in future care. With the current institutional setup the municipalities adapt investments to local needs.

  6. Planned obsolescence publishing, technology, and the future of the academy

    CERN Document Server

    Fitzpatrick, Kathleen

    2011-01-01

    Academic institutions are facing a crisis in scholarly publishing at multiple levels: presses are stressed as never before, library budgets are squeezed, faculty are having difficulty publishing their work, and promotion and tenure committees are facing a range of new ways of working without a clear sense of how to understand and evaluate them. Planned Obsolescence is both a provocation to think more broadly about the academy’s future and an argument for reconceiving that future in more communally-oriented ways. Facing these issues head-on, Kathleen Fitzpatrick focuses on the technological changes—especially greater utilization of internet publication technologies, including digital archives, social networking tools, and multimedia—necessary to allow academic publishing to thrive into the future. But she goes further, insisting that the key issues that must be addressed are social and institutional in origin. Springing from original research as well as Fitzpatrick’s own hands-on experiments in ne...

  7. Planning, Implementation and Optimization of Future space Missions using an Immersive Visualization Environement (IVE) Machine

    Science.gov (United States)

    Harris, E.

    Planning, Implementation and Optimization of Future Space Missions using an Immersive Visualization Environment (IVE) Machine E. N. Harris, Lockheed Martin Space Systems, Denver, CO and George.W. Morgenthaler, U. of Colorado at Boulder History: A team of 3-D engineering visualization experts at the Lockheed Martin Space Systems Company have developed innovative virtual prototyping simulation solutions for ground processing and real-time visualization of design and planning of aerospace missions over the past 6 years. At the University of Colorado, a team of 3-D visualization experts are developing the science of 3-D visualization and immersive visualization at the newly founded BP Center for Visualization, which began operations in October, 2001. (See IAF/IAA-01-13.2.09, "The Use of 3-D Immersive Visualization Environments (IVEs) to Plan Space Missions," G. A. Dorn and G. W. Morgenthaler.) Progressing from Today's 3-D Engineering Simulations to Tomorrow's 3-D IVE Mission Planning, Simulation and Optimization Techniques: 3-D (IVEs) and visualization simulation tools can be combined for efficient planning and design engineering of future aerospace exploration and commercial missions. This technology is currently being developed and will be demonstrated by Lockheed Martin in the (IVE) at the BP Center using virtual simulation for clearance checks, collision detection, ergonomics and reach-ability analyses to develop fabrication and processing flows for spacecraft and launch vehicle ground support operations and to optimize mission architecture and vehicle design subject to realistic constraints. Demonstrations: Immediate aerospace applications to be demonstrated include developing streamlined processing flows for Reusable Space Transportation Systems and Atlas Launch Vehicle operations and Mars Polar Lander visual work instructions. Long-range goals include future international human and robotic space exploration missions such as the development of a Mars

  8. Future Ready Learning: Reimagining the Role of Technology in Education. 2016 National Education Technology Plan

    Science.gov (United States)

    Thomas, Susan

    2016-01-01

    The National Education Technology Plan is the flagship educational technology policy document for the United States. The 2016 Plan, "Future Ready Learning: Reimagining the Role of Technology in Education," articulates a vision of equity, active use, and collaborative leadership to make everywhere, all-the-time learning possible. While…

  9. Deja vu: The Unified Command Plan of the Future Revisited

    Science.gov (United States)

    2011-05-19

    Approved for Public Release; Distribution is Unlimited Déjà vu : The Unified Command Plan of the Future Revisited A Monograph by Lieutenant...DD-MM-YYYY) 19-05-2011 2. REPORT TYPE Monograph 3. DATES COVERED (From - To) JUL 2010 – MAY 2011 4. TITLE AND SUBTITLE Déjà vu : The Unified...i SCHOOL OF ADVANCED MILITARY STUDIES MONOGRAPH APPROVAL Lieutenant Colonel Edward Francis Martignetti Title of Monograph: Déjà vu : The Unified

  10. Pediatric hospital medicine: a strategic planning roundtable to chart the future.

    Science.gov (United States)

    Rauch, Daniel A; Lye, Patricia S; Carlson, Douglas; Daru, Jennifer A; Narang, Steve; Srivastava, Rajendu; Melzer, Sanford; Conway, Patrick H

    2012-04-01

    Given the growing field of Pediatric Hospital Medicine (PHM) and the need to define strategic direction, the Society of Hospital Medicine, the American Academy of Pediatrics, and the Academic Pediatric Association sponsored a roundtable to discuss the future of the field. Twenty-one leaders were invited plus a facilitator utilizing established health care strategic planning methods. A "vision statement" was developed. Specific initiatives in 4 domains (clinical practice, quality of care, research, and workforce) were identified that would advance PHM with a plan to complete each initiative. Review of the current issues demonstrated gaps between the current state of affairs and the full vision of the potential impact of PHM. Clinical initiatives were to develop an educational plan supporting the PHM Core Competencies and a clinical practice monitoring dashboard template. Quality initiatives included an environmental assessment of PHM participation on key committees, societies, and agencies to ensure appropriate PHM representation. Three QI collaboratives are underway. A Research Leadership Task Force was created and the Pediatric Research in Inpatient Settings (PRIS) network was refocused, defining a strategic framework for PRIS, and developing a funding strategy. Workforce initiatives were to develop a descriptive statement that can be used by any PHM physician, a communications tool describing "value added" of PHM; and a tool to assess career satisfaction among PHM physicians. We believe the Roundtable was successful in describing the current state of PHM and laying a course for the near future. Copyright © 2011 Society of Hospital Medicine.

  11. Highways of the future : a strategic plan for highway infrastructure research and development

    Science.gov (United States)

    2008-07-01

    This Highways of the FutureA Strategic Plan for Highway Infrastructure Research and Development was developed in response to a need expressed by the staff of the Federal Highway Administration (FHWA) Office of Infrastructure Research and Developme...

  12. Planned Change in Future Models of Project Follow Through: A Concept Paper.

    Science.gov (United States)

    Simpkins, Edward; Brown, Asa

    The three chapters included in this paper establish a basis for organizing future implementations of Project Follow Through. Specifically, chapter 1 identifies four planning objectives for coordinating such programs. Emphasis is given to the need to focus on one fundamental, pervasive variable possibly accounting for program success: time…

  13. Land use planning and wildfire: development policies influence future probability of housing loss

    Science.gov (United States)

    Syphard, Alexandra D.; Massada, Avi Bar; Butsic, Van; Keeley, Jon E.

    2013-01-01

    Increasing numbers of homes are being destroyed by wildfire in the wildland-urban interface. With projections of climate change and housing growth potentially exacerbating the threat of wildfire to homes and property, effective fire-risk reduction alternatives are needed as part of a comprehensive fire management plan. Land use planning represents a shift in traditional thinking from trying to eliminate wildfires, or even increasing resilience to them, toward avoiding exposure to them through the informed placement of new residential structures. For land use planning to be effective, it needs to be based on solid understanding of where and how to locate and arrange new homes. We simulated three scenarios of future residential development and projected landscape-level wildfire risk to residential structures in a rapidly urbanizing, fire-prone region in southern California. We based all future development on an econometric subdivision model, but we varied the emphasis of subdivision decision-making based on three broad and common growth types: infill, expansion, and leapfrog. Simulation results showed that decision-making based on these growth types, when applied locally for subdivision of individual parcels, produced substantial landscape-level differences in pattern, location, and extent of development. These differences in development, in turn, affected the area and proportion of structures at risk from burning in wildfires. Scenarios with lower housing density and larger numbers of small, isolated clusters of development, i.e., resulting from leapfrog development, were generally predicted to have the highest predicted fire risk to the largest proportion of structures in the study area, and infill development was predicted to have the lowest risk. These results suggest that land use planning should be considered an important component to fire risk management and that consistently applied policies based on residential pattern may provide substantial benefits for

  14. Unraveling the Importance of Climate Change Resilience in Planning the Future Sustainable Energy System

    Science.gov (United States)

    Tarroja, B.; AghaKouchak, A.; Forrest, K.; Chiang, F.; Samuelsen, S.

    2017-12-01

    In response to concerns regarding the environmental impacts of the current energy resource mix, significant research efforts have been focused on determining the future energy resource mix to meet emissions reduction and environmental sustainability goals. Many of these studies focus on various constraints such as costs, grid operability requirements, and environmental performance, and develop different plans for the rollout of energy resources between the present and future years. One aspect that has not yet been systematically taken into account in these planning studies, however, is the potential impacts that changing climates may have on the availability and performance of key energy resources that compose these plans. This presentation will focus on a case study for California which analyzes the impacts of climate change on the greenhouse gas emissions and renewable resource utilization of an energy resource plan developed by Energy Environmental Economics for meeting the state's year 2050 greenhouse gas goal of 80% reduction in emissions by the year 2050. Specifically, climate change impacts on three aspects of the energy system are investigated: 1) changes in hydropower generation due to altered precipitation, streamflow and runoff patterns, 2) changes in the availability of solar thermal and geothermal power plant capacity due to shifting water availability, and 3) changes in the residential and commercial electric building loads due to increased temperatures. These impacts were discovered to cause the proposed resource plan to deviate from meeting its emissions target by up to 5.9 MMT CO2e/yr and exhibit a reduction in renewable resource penetration of up to 3.1% of total electric energy. The impacts of climate change on energy system performance were found to be mitigated by increasing the flexibility of the energy system through increased storage and electric load dispatchability. Overall, this study highlights the importance of taking into account and

  15. AFP: First Experience with Data and Future Plans

    CERN Document Server

    Gach, Grzegorz; The ATLAS collaboration

    2017-01-01

    The aim of the ATLAS Forward Proton (AFP) detector system is the measurement of protons scattered diffractively or electromagnetically at very small angles. The first arm of the system was installed last year and AFP took data in several commissioning and physics runs. The installation of the second arm is ongoing and will be completed in time for the 2017 data taking period. This will allow measurements of processes with two forward protons: central diffraction, exclusive production, and two-photon processes. During the presentation, the early results and experience from the first year of data taking will be presented together with the status of the second-arm installation and plans for the future.

  16. AFP: First experience with data and future plans

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00184415; The ATLAS collaboration

    2017-01-01

    The ATLAS Forward Proton (AFP) detector system aims at the measurement of protons scattered diffractively or electromagnetically at very small angles. The first arm of the system was installed in 2016 and AFP took data in several commissioning and physics runs. The installation of the second arm is ongoing and will be completed in time for the 2017 data taking period. This will allow the measurements of processes with two tagged forward protons being a signature of: central diffraction, exclusive production, and two-photon processes. The early results and experience from the first year of data taking is presented together with the status of the secondarm installation and plans for the future.

  17. The development of mentoring-relationship quality, future-planning style, and career goal setting among adolescents from a disadvantaged background.

    Science.gov (United States)

    Lau, Wendy S Y; Zhou, Xiao-Chun; Lai, Simon M K

    2017-03-01

    Our behaviors are regulated by our perception of the future based on past experiences and knowledge. Children from a disadvantaged background might encounter obstacles more frequently when they plan their future. It is possible that a good relationship with an adult volunteer who provides assistance and guidance in the disadvantaged youth's development may facilitate their future-planning style and career goal setting. The present study investigated the role of a good mentoring relationship in promoting a disadvantaged youth's future-planning style and goal-setting ability. It focused on children from a disadvantaged background who participated in the Child Development Fund (CDF) in Hong Kong. In the study, 187 CDF participants (93 with high mentoring-relationship quality [MRQ] and 94 with low MRQ) and 208 comparison group participants were able to complete all four times of the survey. Repeated-measures analyses of covariance showed that Group main effects were observed for both future-planning style, F(2, 374) = 5.92, p career goal-setting self-efficacy, F(2, 376) = 6.07, p planning style only, F(5.78, 1081.21) = 2.17, p planning style and career goal-setting self-efficacy. Multiple regression analyses revealed that mean MRQ score accounted for 3.9% (p planning style and 4.1% (p career goal-setting self-efficacy, supporting the role of a good mentoring relationship. Mentors have introduced new resources to the disadvantaged youths with high MRQ and have promoted the development of various skills through modeling. © 2017 The Institute of Psychology, Chinese Academy of Sciences and John Wiley & Sons Australia, Ltd.

  18. Futuring, Strategic Planning and Shared Awareness: An Ohio University Libraries' Case Study

    Science.gov (United States)

    Staley, David J.; Seaman, Scott; Theodore-Shusta, Eileen

    2012-01-01

    A critical component of strategic planning is creating a shared-awareness among library staff of the potential societal, political, economic and technological changes that will influence how future users will create and consume scholarly materials, what will be expected of library services, and how facilities will be used. The ACRL Futuring…

  19. The JET Intershot Analysis: Current infrastructure and future plans

    International Nuclear Information System (INIS)

    Layne, R.; Cook, N.; Harting, D.; McDonald, D.C.; Tidy, C.

    2010-01-01

    The JET Intershot Analysis (Chain1) generates processed data following a pulse. Maintaining the pulse repetition rate is one of JET's key success factors, so performance of Chain1 is crucial. This paper will describe JET's experience of managing Chain1, including a description of the control system used to ensure the analysis chain runs as quickly as possible, and a discussion of JET's experience of integrating externally developed codes into a standard analysis framework. The current Chain1 infrastructure was developed in 1999 and although reliable and efficient is starting to prove costly in terms of flexibility and extensibility to meet JET's current and future needs. For this reason JET is planning to re-implement the Chain1 system. The paper will outline the work done towards this aim, and present a model of the proposed new system. Finally, possible future steps towards an integrated data production chain for JET will be discussed, and the potential applicability to next generation fusion devices will be outlined.

  20. Planning for Future Care and the End of Life: A Qualitative Analysis of Gay, Lesbian, and Heterosexual Couples.

    Science.gov (United States)

    Thomeer, Mieke Beth; Donnelly, Rachel; Reczek, Corinne; Umberson, Debra

    2017-12-01

    Two key components of end-of-life planning are (1) informal discussions about future care and other end-of-life preferences and (2) formal planning via living wills and other legal documents. We leverage previous work on the institutional aspects of marriage and on sexual-minority discrimination to theorize why and how heterosexual, gay, and lesbian married couples engage in informal and formal end-of-life planning. We analyze qualitative dyadic in-depth interviews with 45 midlife gay, lesbian, and heterosexual married couples ( N = 90 spouses). Findings suggest that same-sex spouses devote considerable attention to informal planning conversations and formal end-of-life plans, while heterosexual spouses report minimal formal or informal planning. The primary reasons same-sex spouses give for making end-of-life preparations are related to the absence of legal protections and concerns about discrimination from families. These findings raise questions about future end-of-life planning for same- and different-sex couples given a rapidly shifting legal and social landscape.

  1. Status of the SNS superconducting linac and future plan

    International Nuclear Information System (INIS)

    Kim, Sang-Ho

    2008-01-01

    The use of superconducting radiofrequency (SRF) cavities in particle accelerator is becoming more widespread. Among the projects that make use of that technology is the Spallation Neutron Source, where H- ions are accelerated to about 1 GeV, mostly making use of niobium elliptical cavities. SNS generates neutrons by the spallation reaction with the accelerated short (about 700 ns) sub-bunches of protons, which will in turn allow probing structural and magnetic properties of new and existing materials. The SNS superconducting linac is the largest application of RF superconductivity to come on-line in the last decade and has been operating with beam for almost two years. As the first operational pulsed superconducting linac, many of the aspects of its performance were unknown and unpredictable. A lot of experiences and data have been gathered on the pulsed behavior of cavities and cryomodules at various repetition rates and at various temperatures during the commissioning of its components and beam operations. This experience is of great value in determining future optimizations of SNS as well in guiding in the design and operation of future pulsed superconducting linacs. The testing of the superconducting cavities, the operating experience with beam, the performance of the superconducting linac and the future plans will be presented.

  2. Challenging the Future - Journey to Excellence. Aeropropulsion strategic plan for the 1990's

    Science.gov (United States)

    Over the past several months, the Lewis Aeropropulsion Management Council (AMC) has conducted a critical assessment of its strategic plan. This assessment clearly indicated a need for change, both in the aeropropulsion program emphasis and in the approach to carrying out that program. Customers sent a strong message that the program must improve the timeliness of research and technology products and services and must work more closely with them to develop and transfer new technology. The strategic plan defines AMC's vision for the future and underlying organizational values. It contains a set of broad strategies and actions that point the way toward achieving the goals of customer satisfaction, organizational effectiveness, and programmatic excellence. Those strategies are expected to form the basis for the development of specific tactical plans by Lewis aeropropulsion thrust teams, divisions, and branches. To guide tactical planning of the aeropropulsion program, this strategic plan outlines the agency's strategic directions and long-range aeronautics goals, the aeropropulsion goals and key objectives for achieving them, projections of Lewis aeropropulsion budgets, planned allocations of resources, and the processes that will be used to measure success in carrying out the strategic plan.

  3. Saudi Arabia plans future strategy

    International Nuclear Information System (INIS)

    Roberts, John.

    1996-01-01

    The future strategy of Saudi Arabia with respect to its oil production capacity is discussed. A major uncertainty affecting planning is the prospect of an Iraqi return to the market as and when Saddam Hussein falls or he manages to comply fully with all the UN resolutions and sanctions are lifted. It is believed that Iraq could at very short notice be capable of exporting 2mb/d of crude rising to 2.5 mb/d within a few months. This is 10% of OPEC's physically traded crude. Also taken seriously are Baghdad's assertions that Iraq will have a production capacity of about 6mb/d by the year 2000. Saudi officials are concerned that OPEC is not ready to tackle the impact of an Iraqi return to the market at a time when some OPEC members are producing above quota anyway. The most likely outcome is thought to be that OPEC would simply raise their nominal production ceiling. Against this background, Saudi Arabia has embarked on the exploitation of the gigantic oil reserves of the Shaybah field. This development offers the kingdom an ability, on the one hand, to increase its earnings while remaining within its OPEC quota and, on the other hand, to increase output substantially should it ever appear that its best interests are served by not adhering to quotas. (UK)

  4. GIS-Based Planning and Modeling for Renewable Energy: Challenges and Future Research Avenues

    Directory of Open Access Journals (Sweden)

    Bernd Resch

    2014-05-01

    Full Text Available In the face of the broad political call for an “energy turnaround”, we are currently witnessing three essential trends with regard to energy infrastructure planning, energy generation and storage: from planned production towards fluctuating production on the basis of renewable energy sources, from centralized generation towards decentralized generation and from expensive energy carriers towards cost-free energy carriers. These changes necessitate considerable modifications of the energy infrastructure. Even though most of these modifications are inherently motivated by geospatial questions and challenges, the integration of energy system models and Geographic Information Systems (GIS is still in its infancy. This paper analyzes the shortcomings of previous approaches in using GIS in renewable energy-related projects, extracts distinct challenges from these previous efforts and, finally, defines a set of core future research avenues for GIS-based energy infrastructure planning with a focus on the use of renewable energy. These future research avenues comprise the availability base data and their “geospatial awareness”, the development of a generic and unified data model, the usage of volunteered geographic information (VGI and crowdsourced data in analysis processes, the integration of 3D building models and 3D data analysis, the incorporation of network topologies into GIS, the harmonization of the heterogeneous views on aggregation issues in the fields of energy and GIS, fine-grained energy demand estimation from freely-available data sources, decentralized storage facility planning, the investigation of GIS-based public participation mechanisms, the transition from purely structural to operational planning, data privacy aspects and, finally, the development of a new dynamic power market design.

  5. The first ep collider run and future plans

    International Nuclear Information System (INIS)

    Desy, R.B.

    1993-01-01

    After successful machine commissioning in 1991, the new electron-proton collider HERA was ready to start the experimental program in spring last year. Data taking at the ZEUS and H1 experiments began on June 26. The energy of the colliding beams was E e =26.7 GeV and E p = 820 GeV, in accord with the design. The peak luminosity obtained so far was 2.2x10 29 cm -2 s -1 . Until the end of the experimental run in November 1992 an integrated luminosity of 33 nb -1 was delivered to the experiments. Future plans concerning ep operation focus on increasing the number of colliding bunches in order to approach the design goal for the luminosity of 1.5x10 31 cm -2 s -1 . In the electron ring, up to 60% transverse spin polarization have been achieved. It is planned to install a polarized gas target experiment (Hermes, approved as the 3rd HERA experiment) which will require an electron beam with about 50% longitudinal polarization. The machine modifications required for HERMES are scheduled for the 93/94 winter shut down. Furthermore, the possibilities of installing a fixed target experiment for b-quark physics in the proton ring are being studied

  6. Strategic Sustainability Performance Plan. Discovering Sustainable Solutions to Power and Secure America’s Future

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2010-09-01

    Sustainability is fundamental to the Department of Energy’s research mission and operations as reflected in the Department’s Strategic Plan. Our overarching mission is to discover the solutions to power and secure America’s future.

  7. Status and future plans of polarized beams at COSY

    Science.gov (United States)

    Lorentz, B.; Gebel, R.; Lehrach, A.; Maier, R.; Prasuhn, D.; Stockhorst, H.

    2011-05-01

    In this paper we report on the present status and future plans of polarized beams in the COSY synchrotron ring. COSY is a synchrotron ring in the momentum range from 295 to 3700 MeV/c. Polarized deuterons and protons are routinely delivered to experiments over the whole momentum range. No depolarization occurs during the acceleration of deuterons in COSY. For polarized protons many depolarizing resonances are crossed without polarization loss. At imperfection resonances, vertical steerer magnets are used to increase the resonance strength, leading to a complete polarization reversal. At intrinsic resonances a fast tune jump quadrupole is used to quickly cross the resonances without loss of polarization. Typical proton polarizations are close to 0.8 below 2.1 GeV/c and about 0.6 for higher momenta. During recent operation an induced depolarizing resonance was used for accurate determination of the relative momentum spread dp/p of the stored beam yielding an accuracy of better than 10-4. For spin filter studies of the PAX collaboration a low beta target section was installed in 2009 and was successfully put into operation early 2010. An upgrade of the EDDA polarimeter electronics and data acquisition system is underway to ensure continued availability of the polarimeter, which is essential for the polarized proton operation of COSY. In the near future it is planned to install a Siberian snake solenoid of 4.5 Tm to be able to provide in addition to vertically polarized protons, longitudinal polarization as well. This solenoid will allow the preparation of a longitudinally polarized beam up to a kinetic energy of 500 MeV.

  8. Motivations and future practice plans of orthodontic residents in Saudi Arabia

    Science.gov (United States)

    Al-Hamlan, Nasir; Al-Ruwaithi, Moatazbellah M.; Al-Shraim, Nasir; El-Metwaaly, Ashraf

    2013-01-01

    Aims: This study aims to explore the criteria used by graduate students while selecting a career as orthodontists and their future aspirations. Materials and Methods: A list of Saudi Board of Orthodontics (SB-Ortho) residents was obtained from the Central and Western regions of the Kingdom and all orthodontic residents (excluding the 1st year residents) were invited to participate in this survey. Permission to contact the orthodontic residents was obtained from the respective program directors. The final study sample composed of 36 orthodontic residents. Results: About 39% of residents chose orthodontic specialty after graduation, nearly 33% selected the career during the undergraduate education while the rest chose the specialty at other stages. Approximately, 67% of the residents chose orthodontic specialty because it is intellectual challenging. Around 25% of residents choose orthodontic to improve their earning and 39% join orthodontic for job prestige. Around 50% of orthodontic Saudi residents planned to use self-ligating brackets; 63.9% planned to use invisalign; 86.1% plan to use temporary anchorage devices. About 72% of residents plan to use a cone-beam computerized tomography; 89% plan to use a digital imaging program; 39% plan to use indirect bonding; and 28% plan to use lingual orthodontics. More than half of the residents showed interest to participate in the research and about a quarter of them were willing to work in small cities. Conclusions: Most of the orthodontic residents in Saudi Arabia take up this specialty as they felt that it was intellectually challenging. The SB-Ortho program adequately prepares the residents in all the modern aspects of the specialty. PMID:24987645

  9. Evolution of strategic risks under future scenarios for improved utility master plans.

    Science.gov (United States)

    Luís, Ana; Lickorish, Fiona; Pollard, Simon

    2016-01-01

    Integrated, long-term risk management in the water sector is poorly developed. Whilst scenario planning has been applied to singular issues (e.g. climate change), it often misses a link to risk management because the likelihood of impacts in the long-term are frequently unaccounted for in these analyses. Here we apply the morphological approach to scenario development for a case study utility, Empresa Portuguesa das Águas Livres (EPAL). A baseline portfolio of strategic risks threatening the achievement of EPAL's corporate objectives was evolved through the lens of three future scenarios, 'water scarcity', 'financial resource scarcity' and 'strong economic growth', built on drivers such as climate, demographic, economic, regulatory and technological changes and validated through a set of expert workshops. The results represent how the baseline set of risks might develop over a 30 year period, allowing threats and opportunities to be identified and enabling strategies for master plans to be devised. We believe this to be the first combined use of risk and futures methods applied to a portfolio of strategic risks in the water utility sector. Copyright © 2015 Elsevier Ltd. All rights reserved.

  10. Rationalization and future planning for AECL's research reactor capability

    International Nuclear Information System (INIS)

    Slater, J.B.

    1990-01-01

    AECL's research reactor capability has played a crucial role in the development of Canada's nuclear program. All essential concepts for the CANDU reactors were developed and tested in the NRX and NRU reactors, and in parallel, important contributions to basic physics were made. The technical feasibility of advanced fuel cycles and of the organic-cooled option for CANDU reactors were also demonstrated in the two reactors and the WR-1 reactor. In addition, an important and growing radio-isotope production industry was established and marketed on a world-wide basis. In 1984, however, it was recognized that a review and rationalization of the research reactor capability was required. The commercial success of the CANDU reactor system had reduced the scope and size of the required development program. Limited research and development funding and competition from other research facilities and programs, required that the scope be reduced to a support basis essential to maintain strategic capability. Currently, AECL, is part-way through this rationalization program and completion should be attained during 1992/93 when the MAPLE reactor is operational and decisions on NRX decommissioning will be made. A companion paper describes some of the unique operational and maintenance problems which have resulted from this program and the solutions which have been developed. Future planning must recognize the age of the NRU reactor (currently 32 years) and the need to plan for eventual replacement. Strategy is being developed and supporting studies include a full technical assessment of the NRU reactor and the required age-related upgrading program, evaluation of the performance characteristics and costs of potential future replacement reactors, particularly the advanced MAPLE concept, and opportunities for international co-operation in developing mutually supportive research programs

  11. The future orientation of foresters: An exploratory research among Dutch foresters into the prerequisite for strategic planning in forestry

    NARCIS (Netherlands)

    Hoogstra, M.A.; Schanz, H.

    2008-01-01

    The importance of strategic planning as an instrument to cope with the uncertain future has been long recognized, especially in forestry which is characterized by its relationship with the distant future. Surprisingly, the question to what extent the future is indeed considered in forestry

  12. 20 Years of Dukovany NPP Operation and Plans for Future

    International Nuclear Information System (INIS)

    Vlcek, J.

    2006-01-01

    NPP Dukovany (4x440MW), the first Czech nuclear power plant and a keystone of Czech Electricity Grid, in 2005 celebrated 20 years of successful operation. In my presentation I am going to speak about next areas. I will start about construction and commissioning history of Dukovany NPP, then I'll put forward what milestones of Dukovany NPP operation were accomplished, I'll say examples about our modernisation and investment activities (including replacement of IandC equipment, modifications for increasing of power and support grid services) and in the end our plans for future. (author)

  13. Capital planning for operating theatres based on projecting future theatre requirements.

    Science.gov (United States)

    Sheehan, Jennifer A; Tyler, Peter; Jayasinha, Hirani; Meleady, Kathleen T; Jones, Neill

    2011-05-01

    During 2006, NSW and ACT Health Departments jointly engaged KPMG to develop an Operating Theatre Requirements' Projection Model and an accompanying planning guideline. A research scan was carried out to identify drivers of surgical demand, theatre capacity and theatre performance, as well as locating existing approaches to modelling operating theatre requirements for planning purposes. The project delivered a Microsoft Excel-based model for projecting future operating theatre requirements, together with an accompanying guideline for use of the model and interpretation of its outputs. It provides a valuable addition to the suite of tools available to Health staff for service and capital planning. The model operates with several limitations, largely due to being data dependent, and the state and completeness of available theatre activity data. However, the operational flexibility built into the model allows users to compensate for these limitations, on a case by case basis, when the user has access to suitable, local data. The design flexibility of the model means that updating the model as improved data become available is not difficult; resulting in revisions being able to be made quickly, and disseminated to users rapidly.

  14. Strategic Plan for the Spanish Academy of Dermatology and Venerology (AEDV): FuturAEDV 2013-2017.

    Science.gov (United States)

    Ribera Pibernat, M; Moreno Jiménez, J C; Valcuende Cavero, F; Soto de Delás, J; Vázquez Veiga, H; Lázaro Ochaíta, P; Giménez Arnau, A

    2014-09-01

    The Spanish Academy of Dermatology and Venereology (AEDV) has decided that a Strategic Plan is needed to help the association adapt to new circumstances and anticipate future developments. 1) To position the AEDV as a medical association that can exert an influence in everything related to dermatology. 2) To contribute to the development of the specialty, strengthening the prestige and reputation of dermatology and dermatologists. 3) To establish a model for operating and strategic thinking that can be handed on to successive Boards of Directors and will enable the Academy to identify future challenges. The approach used to develop the Strategic Plan was as follows: analysis of trends in the health care system; assessment of the current situation of AEDV and of dermatology in general through an internal analysis based on surveys and interviews with academics; analysis of strengths, weaknesses, opportunities, and threats; preparation of a mission statement; and identification, development, and implementation of a strategy map prioritizing strategic lines of action. The strategy map set out 16 general goals grouped into 4 main topics (achieving the vision, internal and external customers, internal processes, and innovation) and detailed in an action plan with 19 initiatives, each with specific actions. The plan will be monitored by the Strategic Plan Monitoring Committee, which is made up of the members of the Standing Committee and the chairs of the 9 Technical Committees responsible for implementing the initiatives. The Functional Plan should guide the management of AEDV until 2017, and its implementation will enable the association to contribute to the development and prestige of the specialty and position itself as a reference in terms of its functional model. Copyright © 2014 Elsevier España, S.L.U. y AEDV. All rights reserved.

  15. 77 FR 36406 - Connect America Fund; a National Broadband Plan for Our Future; Establishing Just and Reasonable...

    Science.gov (United States)

    2012-06-19

    ... America Fund; a National Broadband Plan for Our Future; Establishing Just and Reasonable Rates for Local Exchange Carriers; High-Cost Universal Service Support; Correction AGENCY: Federal Communications...

  16. 1990-1991 Marketing Plan. Year II: Planning To Meet the Future.

    Science.gov (United States)

    Turcott, Frances; And Others

    In Maryland, Catonsville Community College's (CCC) 1990-91 marketing plan deals with the community's perceptions of the institution and strategies to improve CCC's image. Both the 1989-90 and 1990-91 plans targeted the same markets for special recruitment strategies; i.e., high school graduates with transfer plans, part-time adult students,…

  17. Strategic planning for future learning environments: an exploration of interpersonal, interprofessional and political factors.

    Science.gov (United States)

    Schmidt, Cathrine

    2013-09-01

    This article, written from the stance of a public planner and a policy maker, explores the challenges and potential in creating future learning environments through the concept of a new learning landscape. It is based on the belief that physical planning can support the strategic goals of universities. In Denmark, a political focus on education as a mean to improve national capacity for innovation and growth are redefining the universities role in society. This is in turn changing the circumstances for the physical planning. Drawing on examples of physical initiatives in three different scales--city, building and room scale, the paper highlights how space and place matters on an interpersonal, an interprofessional and a political level. The article suggests that a wider understanding of how new learning landscapes are created--both as a material reality and a political discourse--can help frame an emerging community of practice. This involves university leaders, faculty and students, architects, designers and urban planners, citizens and policy makers with the common goal of creating future learning environments today.

  18. Digital Story-Based Problem Solving Applications: Preservice Primary Teachers' Experiences and Future Integration Plans

    Science.gov (United States)

    Kilic, Çigdem; Sancar-Tokmak, Hatice

    2017-01-01

    This case study investigates how preservice primary school teachers describe their experiences with digital story-based problem solving applications and their plans for the future integration of this technology into their teaching. Totally 113 preservice primary school teachers participated in the study. Data collection tools included a…

  19. Software to support planning for future waste treatment, storage, transport, and disposal requirements

    International Nuclear Information System (INIS)

    Holter, G.M.; Shay, M.R.; Stiles, D.L.

    1990-04-01

    Planning for adequate and appropriate treatment, storage, transport and disposal of wastes to be generated or received in the future is a complex but critical task that can be significantly enhanced by the development and use of appropriate software. This paper describes a software system that has been developed at Pacific Northwest Laboratory to aid in such planning. The basic needs for such a system are outlined, and the approach adopted in developing the software is described. The individual components of the system, and their integration into a unified system, are discussed. Typical analytical applications of this type of software are summarized. Conclusions concerning the development of such software systems and the necessary supporting data are then presented. 2 figs

  20. Systematic Reviews of Mechanisms for Financing Family Planning: Findings, Implications, and Future Agenda.

    Science.gov (United States)

    Lissner, Craig L; Ali, Moazzam

    2016-12-01

    The article describes an international collaboration that systematically reviewed the evidence on financing mechanisms for family planning/contraception, assessed the strength of and summarized the evidence, identified research gaps, and proposed a new research agenda to address the gaps. The review found that the evidence base is weak owing to the paucity of studies, diversity in findings, and variations in intervention, study design, and outcome measures. Of more than 17,000 papers reviewed only 38 met the eligibility criteria. A number of general recommendations on the directions and areas of future research can be drawn. There is a strong need for more robust study designs on the effectiveness of financial incentives in family planning. © 2016 The Population Council, Inc.

  1. Program plan for future regulatory activity in nuclear-power-plant maintenance

    International Nuclear Information System (INIS)

    Badalamente, R.V.

    1982-10-01

    The intent of this paper is to describe the results of a study of nuclear power plant (NPP) maintenance conducted by Battelle's Pacific Northwest Laboratories (PNL) for the Nuclear Regulatory Commission (NRC). The purpose of the study for the NRC was to determine problems affecting human performance in NPP maintenance, pinpoint those which adversely affect public health and safety, review strategies for overcoming the problems, and suggest the direction that regulatory activities should take. Results of the study were presented to the NRC (Division of Human Factors Safety) in the form of a recommended program plan for future regulatory activity in NPP maintenance

  2. 810 Future plans

    International Nuclear Information System (INIS)

    Etkin, A.; Foley, K.J.; Hackenburg, R.W.; Longacre, R.S.; Love, W.A.; Morris, T.W.; Platner, E.D.; Saulys, A.C.; Lindenbaum, S.J.; Chan, C.S.; Kramer, M.A.; Hallman, T.J.; Madansky, L.; Bonner, B.E.; Buchanan, J.A.; Chiou, C.N.; Clement, J.M.; Corcoran, M.D.; Kruk, J.W.; Miettinen, H.E.; Mutchler, G.S.; Nessi-Tedaldi, F.; Nessi, M.; Roberts, J.B.

    1990-01-01

    It is believed that a good bet for finding the Quark-Gluon Plasma at AGS energies is with the heaviest projectiles on the heaviest target, i.e. Au on Au. One of the likely signatures of the plasma is strangeness enhancement. Al Saulys has shown what it's like to find Δ and K degree with Si projectiles. Our Monte Carlo simulations show track densities 4 times higher for Au projectiles. In addition, the Au beam itself produces 30 times more ionization. Thus the present TPC's will be limited to only a few hundred ions per sec. This paper discusses plans for these experiments and modification to TPC. 9 figs

  3. Using genetic algorithms to optimise current and future health planning - the example of ambulance locations

    Directory of Open Access Journals (Sweden)

    Suzuki Hiroshi

    2010-01-01

    Full Text Available Abstract Background Ambulance response time is a crucial factor in patient survival. The number of emergency cases (EMS cases requiring an ambulance is increasing due to changes in population demographics. This is decreasing ambulance response times to the emergency scene. This paper predicts EMS cases for 5-year intervals from 2020, to 2050 by correlating current EMS cases with demographic factors at the level of the census area and predicted population changes. It then applies a modified grouping genetic algorithm to compare current and future optimal locations and numbers of ambulances. Sets of potential locations were evaluated in terms of the (current and predicted EMS case distances to those locations. Results Future EMS demands were predicted to increase by 2030 using the model (R2 = 0.71. The optimal locations of ambulances based on future EMS cases were compared with current locations and with optimal locations modelled on current EMS case data. Optimising the location of ambulance stations locations reduced the average response times by 57 seconds. Current and predicted future EMS demand at modelled locations were calculated and compared. Conclusions The reallocation of ambulances to optimal locations improved response times and could contribute to higher survival rates from life-threatening medical events. Modelling EMS case 'demand' over census areas allows the data to be correlated to population characteristics and optimal 'supply' locations to be identified. Comparing current and future optimal scenarios allows more nuanced planning decisions to be made. This is a generic methodology that could be used to provide evidence in support of public health planning and decision making.

  4. Tsunami evacuation plans for future megathrust earthquakes in Padang, Indonesia, considering stochastic earthquake scenarios

    Directory of Open Access Journals (Sweden)

    A. Muhammad

    2017-12-01

    Full Text Available This study develops tsunami evacuation plans in Padang, Indonesia, using a stochastic tsunami simulation method. The stochastic results are based on multiple earthquake scenarios for different magnitudes (Mw 8.5, 8.75, and 9.0 that reflect asperity characteristics of the 1797 historical event in the same region. The generation of the earthquake scenarios involves probabilistic models of earthquake source parameters and stochastic synthesis of earthquake slip distributions. In total, 300 source models are generated to produce comprehensive tsunami evacuation plans in Padang. The tsunami hazard assessment results show that Padang may face significant tsunamis causing the maximum tsunami inundation height and depth of 15 and 10 m, respectively. A comprehensive tsunami evacuation plan – including horizontal evacuation area maps, assessment of temporary shelters considering the impact due to ground shaking and tsunami, and integrated horizontal–vertical evacuation time maps – has been developed based on the stochastic tsunami simulation results. The developed evacuation plans highlight that comprehensive mitigation policies can be produced from the stochastic tsunami simulation for future tsunamigenic events.

  5. Results and future plans for the innovative basic research on high temperature engineering

    International Nuclear Information System (INIS)

    2001-05-01

    The High Temperature Engineering Test Reactor (HTTR) is under the rise-to-power stage at the Oarai Research Establishment of Japan Atomic Energy Research Institute (JAERI). This reactor is aimed not only at establishment of the infrastructural technology on high temperature gas-cooled reactor and its upgrading, but also at promotion of the innovative basic research on high temperature engineering. The research is a series of innovative high-temperature irradiation studies, making the best use of the characteristic of the HTTR that it provides a very wide irradiation space at high temperatures. The JAERI has been conducting preliminary tests of the innovative research since 1994, in collaboration with universities and other research institutes, in the fields of 1) new materials development, 2) high temperature radiation chemistry and fusion-related research, and 3) high temperature irradiation techniques and other nuclear research. The HTTR Utilization Research Committee has been examining the results and methodology of the preliminary tests and the future plans, as well as examining the preparatory arrangements of facilities for the HTTR irradiation and post-irradiation examinations. This report presents a summary of results of the preliminary tests and preparatory arrangements for about seven years, together with an outline of the future plans. (author)

  6. Current and future plans for wind energy development on San Clemente Island, California

    Energy Technology Data Exchange (ETDEWEB)

    Hurley, P.J.F. [RLA Consulting, Inc., Bothell, WA (United States); Cable, S.B. [Naval Facilities Engineering Service Center, Port Hueneme, CA (United States)

    1996-12-31

    The Navy is considering possible ways to maximize the use of wind energy technology for power supply to their auxiliary landing field and other facilities on San Clemente Island. A summary of their past analysis and future considerations is presented. An analysis was performed regarding the technical and economic feasibility of installing and operating a sea-water pumped hydro/wind energy system to provide for all of the island`s electric power needs. Follow-on work to the feasibility study include wind resource monitoring as well as procurement and preliminary design activities for a first-phase wind-diesel installation. Future plans include the consideration of alternative siting arrangements and the introduction of on-island fresh water production. 3 refs., 4 figs.

  7. Planning protected areas network that are relevant today and under future climate change is possible: the case of Atlantic Forest endemic birds

    Directory of Open Access Journals (Sweden)

    Mariana M. Vale

    2018-05-01

    Full Text Available Background A key strategy in biodiversity conservation is the establishment of protected areas. In the future, however, the redistribution of species in response to ongoing climate change is likely to affect species’ representativeness in those areas. Here we quantify the effectiveness of planning protected areas network to represent 151 birds endemic to the Brazilian Atlantic Forest hotspot, under current and future climate change conditions for 2050. Methods We combined environmental niche modeling and systematic conservation planning using both a county and a regional level planning strategy. We recognized the conflict between biodiversity conservation and economic development, including socio-economic targets (as opposed to biological only and using planning units that are meaningful for policy-makers. Results We estimated an average contraction of 29,500 km2 in environmentally suitable areas for birds, representing 52% of currently suitable areas. Still, the most cost-effective solution represented almost all target species, requiring only ca. 10% of the Atlantic Forest counties to achieve that representativeness, independent of strategy. More than 50% of these counties were selected both in the current and future planned networks, representing >83% of the species. Discussion Our results indicate that: (i planning protected areas network currently can be useful to represent species under climate change; (ii the overlapped planning units in the best solution for both current and future conditions can be considered as “no regret” areas; (iii priority counties are spread throughout the biome, providing specific guidance wherever the possibility of creating protected area arises; and (iv decisions can occur at different administrative spheres (Federal, State or County as we found quite similar numerical solutions using either county or regional level strategies.

  8. Medical oncology future plan of the Spanish Society of Medical Oncology: challenges and future needs of the Spanish oncologists.

    Science.gov (United States)

    Rivera, F; Andres, R; Felip, E; Garcia-Campelo, R; Lianes, P; Llombart, A; Piera, J M; Puente, J; Rodriguez, C A; Vera, R; Virizuela, J A; Martin, M; Garrido, P

    2017-04-01

    The SEOM Future Plan is aimed at identifying the main challenges, trends and needs of the medical oncology speciality over the next years, including potential oncologist workforce shortages, and proposing recommendations to overcome them. The estimations of the required medical oncologists workforce are based on an updated Medical Oncologist Register in Spain, Medical Oncology Departments activity data, dedication times and projected cancer incidence. Challenges, needs and future recommendations were drawn from an opinion survey and an advisory board. A shortage of 211 FTE medical oncologist specialists has been established. To maintain an optimal ratio of 158 new cases/FTE, medical oncology workforce should reach 1881 FTE by 2035. Main recommendations to face the growing demand and complexity of oncology services include a yearly growth of 2.5% of medical oncologist's workforce until 2035, and development and application of more accurate quality indicators for cancer care and health outcomes measure.

  9. Factors Influencing Teaching Choice, Professional Plans about Teaching, and Future Time Perspective: A Mediational Analysis

    Science.gov (United States)

    Eren, Altay; Tezel, Kadir Vefa

    2010-01-01

    This study aimed to examine the mediating role of prospective English teachers' future time perspectives in relation to their motivations for teaching, beliefs about the profession, career choice satisfaction, and professional plans. A total of 423 prospective English teachers voluntarily participated in the study. The mediating role of the future…

  10. Scenario planning.

    Science.gov (United States)

    Enzmann, Dieter R; Beauchamp, Norman J; Norbash, Alexander

    2011-03-01

    In facing future developments in health care, scenario planning offers a complementary approach to traditional strategic planning. Whereas traditional strategic planning typically consists of predicting the future at a single point on a chosen time horizon and mapping the preferred plans to address such a future, scenario planning creates stories about multiple likely potential futures on a given time horizon and maps the preferred plans to address the multiple described potential futures. Each scenario is purposefully different and specifically not a consensus worst-case, average, or best-case forecast; nor is scenario planning a process in probabilistic prediction. Scenario planning focuses on high-impact, uncertain driving forces that in the authors' example affect the field of radiology. Uncertainty is the key concept as these forces are mapped onto axes of uncertainty, the poles of which have opposed effects on radiology. One chosen axis was "market focus," with poles of centralized health care (government control) vs a decentralized private market. Another axis was "radiology's business model," with one pole being a unified, single specialty vs a splintered, disaggregated subspecialty. The third axis was "technology and science," with one pole representing technology enabling to radiology vs technology threatening to radiology. Selected poles of these axes were then combined to create 3 scenarios. One scenario, termed "entrepreneurialism," consisted of a decentralized private market, a disaggregated business model, and threatening technology and science. A second scenario, termed "socialized medicine," had a centralized market focus, a unified specialty business model, and enabling technology and science. A third scenario, termed "freefall," had a centralized market focus, a disaggregated business model, and threatening technology and science. These scenarios provide a range of futures that ultimately allow the identification of defined "signposts" that can

  11. Future Plans of the ATLAS Collaboration for the HL-LHC

    CERN Document Server

    Hristova, Ivana; The ATLAS collaboration

    2018-01-01

    These proceedings report the current plans to upgrade the ATLAS detector at CERN for the High Luminosity LHC (HL-LHC). The HL-LHC is expected to start operations in the middle of 2026, aiming to reach an ultimate peak instantaneous luminosity of 7.5$\\times10^{34}$cm$^{-2}$s$^{-1}$, corresponding to approximately 200 inelastic proton-proton collisions per bunch crossing, and to deliver over a period of twelve years more than ten times the integrated luminosity of the large hadron collider (LHC) Runs 1-3 combined (up to $4000$ fb$^{-1}$). This is a huge challenge to all sub-systems of the detector which will need extensive upgrades to allow the experiment to pursue a rich and interesting physics programme in the future.

  12. Fukushima and energy plans for the future - I

    International Nuclear Information System (INIS)

    Pal, M.K.

    2012-01-01

    Till the fatal day of March 11, 2011, Japan had 55 nuclear reactors in operation generating about 27.3 per cent of her total supply of electricity and the country had an ambitious future plan of further building up the nuclear capacity to meet half of its national demand of electricity from nuclear reactors. Toshiba Corporation of Japan is one of the biggest and most successful names as the manufacturers of commercial nuclear reactors and, at present, they have acquired ownership of electric power companies in other countries as well. The Westinghouse of USA, for example, is presently owned by Toshiba. Japan and her people have earned the praise, for many years, of the nuclear lobbyists around the world for having opted for nuclear energy in a big way despite the fact that the Japanese are the only people that have experienced the nuclear holocaust of Hiroshima and Nagasaki. Some home truth about this popular acceptance of nuclear reactors in Japan will be revealed later in this article

  13. Current status and future plan of the G.A. Siwabessy Multipurpose Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Hastowo, Hudi; Tarigan, Alim; Mardi, Alfahari [Centre for Multipurpose Reactor, National Atomic Energy Agency, Serpong (Indonesia)

    1998-10-01

    Since the first criticality in July 1987, the G.A. Siwabessy Multipurpose Reactor, RSG-GAS, in Serpong-Indonesia has been operated about 26.000 hours up to now. In the last two years the reactor is operated more than 5000 hours per year or equivalent to seven cycles a year. The reactor is utilized for conducting research studies and isotopes production. In the near future the core will be converted to silicide fuel to improve the core performance instead of oxide fuel. The planned maintenance activities are performed according to the schedule. The modifications and remedial maintenance are also performed to ensure that all structures, systems and important to safety are capable of performing as intended. The future activities of the G.A. Siwabessy reactor will be stressed to maintain the reliability and availability of the reactor operation and to optimize the reactor utilization. (author)

  14. Status of muon collider research and development and future plans

    Directory of Open Access Journals (Sweden)

    1999-08-01

    Full Text Available The status of the research on muon colliders is discussed and plans are outlined for future theoretical and experimental studies. Besides work on the parameters of a 3–4 and 0.5 TeV center-of-mass (COM energy collider, many studies are now concentrating on a machine near 0.1 TeV (COM that could be a factory for the s-channel production of Higgs particles. We discuss the research on the various components in such muon colliders, starting from the proton accelerator needed to generate pions from a heavy-Z target and proceeding through the phase rotation and decay (π→μν_{μ} channel, muon cooling, acceleration, storage in a collider ring, and the collider detector. We also present theoretical and experimental R&D plans for the next several years that should lead to a better understanding of the design and feasibility issues for all of the components. This report is an update of the progress on the research and development since the feasibility study of muon colliders presented at the Snowmass '96 Workshop [R. B. Palmer, A. Sessler, and A. Tollestrup, Proceedings of the 1996 DPF/DPB Summer Study on High-Energy Physics (Stanford Linear Accelerator Center, Menlo Park, CA, 1997].

  15. Environmental studies for mining of deep-sea polymetallic nodules - Accomplishments and future plans

    Digital Repository Service at National Institute of Oceanography (India)

    Sharma, R.

    on marine ecosystem, the project on ‘EIA studies for nodule mining in CIB’ was initiated in 1996, under the national programme on polymetallic nodules funded by the Dept. of Ocean Development. Mining of the deep-sea minerals [1] is expected to alter... for the future • Development of predictive ecosystem models • Creation of environmental database • Evaluating the biogeochemical coupling of biota with deep-sea ecosystem • Development of environment management plan for nodule mining References...

  16. Prospective Teachers' Future Time Perspective and Professional Plans about Teaching: The Mediating Role of Academic Optimism

    Science.gov (United States)

    Eren, Altay

    2012-01-01

    This study aimed to examine the mediating role of prospective teachers' academic optimism in the relationship between their future time perspective and professional plans about teaching. A total of 396 prospective teachers voluntarily participated in the study. Correlation, regression, and structural equation modeling analyses were conducted in…

  17. Older and Younger Family Caregivers of Adults with Intellectual Disability: Factors Associated with Future Plans

    Science.gov (United States)

    Chou, Yueh-Ching; Lee, Yue-Chune; Lin, Li-Chan; Kroger, Teppo; Chang, Ai-Ning

    2009-01-01

    A structured interview survey was conducted in a major city in Taiwan to explore and compare older and younger family primary caregivers' well being and their future caregiving plans for these adults with intellectual disability. The sample size was 315 caregivers who were 55 years or older and who cared for adults with intellectual disability and…

  18. 77 FR 30903 - Connect America Fund; A National Broadband Plan for Our Future; Establishing Just and Reasonable...

    Science.gov (United States)

    2012-05-24

    ... America Fund; A National Broadband Plan for Our Future; Establishing Just and Reasonable Rates for Local Exchange Carriers; High-Cost Universal Service Support AGENCY: Federal Communications Commission. ACTION... of information collections associated with the Commission's; Connect America Fund; A National...

  19. 77 FR 35623 - Connect America Fund; a National Broadband Plan for Our Future; Establishing Just and Reasonable...

    Science.gov (United States)

    2012-06-14

    ... America Fund; a National Broadband Plan for Our Future; Establishing Just and Reasonable Rates for Local Exchange Carriers; High-Cost Universal Service Support AGENCY: Federal Communications Commission. ACTION... Fund, Report and Order (Order). The Commission submitted revisions to this information collection under...

  20. Planning and managing future space facility projects. [management by objectives and group dynamics

    Science.gov (United States)

    Sieber, J. E.; Wilhelm, J. A.; Tanner, T. A.; Helmreich, R. L.; Burgenbauch, S. F.

    1979-01-01

    To learn how ground-based personnel of a space project plan and organize their work and how such planning and organizing relate to work outcomes, longitudinal study of the management and execution of the Space Lab Mission Development Test 3 (SMD 3) was performed at NASA Ames Research Center. A view of the problems likely to arise in organizations and some methods of coping with these problems are presented as well as the conclusions and recommendations that pertain strictly to SMD 3 management. Emphasis is placed on the broader context of future space facility projects and additional problems that may be anticipated. A model of management that may be used to facilitate problem solving and communication - management by objectives (MBO) is presented. Some problems of communication and emotion management that MBO does not address directly are considered. Models for promoting mature, constructive and satisfying emotional relationships among group members are discussed.

  1. Monitoring plan and maintenance NPP the Vandellos I and future prospects; Plan de vigilancia y mantenimiento de la instalacion nuclear Vandellos 1 y perspectivas de futuro

    Energy Technology Data Exchange (ETDEWEB)

    Margalef Escoda, S.

    2013-07-01

    This paper intends to give to know the singularities of an installation phase of latency and your monitoring and maintenance plan. the horizons that has the installation medium-term to guide the future dismantling level 3 monitoring and maintenance activities are also described.

  2. Hospital organizational response to the nuclear accident at Three Mile Island: implications for future-oriented disaster planning

    International Nuclear Information System (INIS)

    Maxwell, C.

    1982-01-01

    The 1979 nuclear accident at Three Mile Island (TMI) near Harrisburg, Pennsylvania, caused severe organizational problems for neighboring health care institutions. Dauphin County, just north of TMI, contained four hospitals ranging in distance from 9.5 to 13.5 miles from the stricken plant. Crash plans put into effect within 48 hours of the initial incident successfully reduced hospital census to below 50 per cent of capacity, but retained bedridden and critically ill patients within the risk-zone. No plans existed for area-wide evacuation of hospitalized patients. Future-oriented disaster planning should include resource files of host institution bed capacity and transportation capabilities for the crash evacuation of hospitalized patients during non-traditional disasters

  3. Planning for the future

    Energy Technology Data Exchange (ETDEWEB)

    Rowland, B. [Ohio Automation (USA)

    2004-02-01

    The paper examines the potential of integrated computer-aided mine planning software, ICAMPS. This is Ohio Automation's complete mining software package that runs inside AutoCAD and covers the entire mining process - from geologic modelling of deposit to laying out of the mine, and scheduling and calculating royalty payments. The article describes the various modules of the system: MineSurf for geological modelling, MineSimU-Simulated mining for Underground; MineSimS-Simulated Mining for Surface and MineVent-Ventilation systems analysis. 2 figs.

  4. Comprehensive Care Plan Development Using Resident Assessment Instrument Framework: Past, Present, and Future Practices

    Directory of Open Access Journals (Sweden)

    Mary Ellen Dellefield

    2015-10-01

    Full Text Available Development of the comprehensive care plan (CCP is a requirement for nursing homes participating in the federal Medicare and Medicaid programs, referred to as skilled nursing facilities. The plan must be developed within the context of the comprehensive interdisciplinary assessment framework—the Resident Assessment Instrument (RAI. Consistent compliance with this requirement has been difficult to achieve. To improve the quality of CCP development within this framework, an increased understanding of complex factors contributing to inconsistent compliance is required. In this commentary, we examine the history of the comprehensive care plan; its development within the RAI framework; linkages between the RAI and registered nurse staffing; empirical evidence of the CCP’s efficacy; and the limitations of extant standards of practices in CCP development. Because of the registered nurse’s educational preparation, professional practice standards, and licensure obligations, the essential contributions of professional nurses in CCP development are emphasized. Recommendations for evidence-based micro and macro level practice changes with the potential to improve the quality of CCP development and regulatory compliance are presented. Suggestions for future research are given.

  5. Whakaora nga moemoea o nga tupuna--living the dreams of the ancestors. Future planning in a Kaupapa Māori CAMHS team.

    Science.gov (United States)

    Elder, Hinemoa; Milne, Moe; Witehira, Heemi; Mendes, Patrick; Heslin, Anneliese; Cribb-Su'a, Ainsleigh; Wilson, Riwai; Goldsmith, Arona; Kainamu, Reena; Barrett, Moana; Love, Shar; Cargo, Tania; Kalra, Vanitha

    2009-08-01

    The aim of this study was to identify and operationalize aspects of a future planning process for sustainable delivery of Kaupapa Māori (Specialist Māori) mental health from a team called He Kakano, within Child and Adolescent Mental Health Services in South Auckland, New Zealand. A 2-day hui (meeting) was held with members of the team and a facilitator, Whaea Moe Milne. Review of background national epidemiological data, local data, information from community, carer and tangata whaiora (consumer) stakeholders and the existing He Kakano Model of Care was undertaken. Use of tikanga (Māori protocol and practices) was evident throughout the hui. A number of aspects of tikanga were identified as essential to the positive outcomes of the future plan. This paper reports one in particular, that of whakatauakī (proverbs where the originator is known). "Whakaora nga moemoea o nga tupuna--living the dreams of the ancestors" is a whakatauakī articulated by Whaea Moe Milne, which was identified as helpful in influencing the strategic planning thinking and decision-making process for He Kakano. This whakatauakī enabled the identification of shared goals, values, beliefs, behaviours and an action plan. The existing and ongoing relationship with Whaea Moe Milne was identified as an important element in the way in which the whakatauakī was received and reflected on. Use of tikanga Māori, in this case, whakatauakī, was helpful in developing future planning for He Kakano. This suggests that use of tikanga may be beneficial in other settings where planning for sustainable Māori responsive services is undertaken. Further work in this area is likely to benefit service development, strategic planning, workforce development and have an impact on improving health outcomes for Māori.

  6. Energy for our future : a plan for British Columbia progress to date

    International Nuclear Information System (INIS)

    Ostergaard, P.

    2004-01-01

    This PowerPoint presentation provided a brief overview of British Columbia's electric power system, the policies affecting it, the province's energy plans and support mechanisms to address issues and challenges. In British Columbia, 80 per cent of the electricity is primarily hydro based and is generated by BC Hydro, a public utility. The market structure is regulated and the electricity rates are based on cost of service. The BC market includes western North America with interconnections to Washington State and Alberta. The key issues and challenges facing the electricity sector in the province are meeting domestic demand; adopting clean competitive energy alternatives; export market access and downstream benefits; interest and exchange rates; firming, storage and shaping; transmission upgrades to an aging infrastructure; local governments and First Nations relationships and, permitting and approvals. The transmission system was reviewed with reference to trade with the Pacific Northwest, flexibility and storage. The province's future energy plans are based on low rates and public ownership, secure and reliable supply, more private sector opportunities, and environmental responsibility. figs

  7. Sixth General Radioactive Waste Plan. Planning to the future of ENRESA

    International Nuclear Information System (INIS)

    Espejo Hernandez, J. M.

    2006-01-01

    The Government approved last June 23''rd the Sixth General Radioactive Waste Plan that presents the activities to be carried out by ENRESA in all its field of responsibility to the year 2070. The document considers as one of the principal changes that ENRESA will be restructured to corporate public entity assigned to the Ministry of Industry, Tourism and Trade as well as the need of a Centralised Temporary Storage for the spent fuel and the high level radioactive wastes generated in Spain. Nevertheless, information is provided on the plans for the full decommissioning of the nuclear power plants to complete their operational life and also the economic and financial aspects related to the activities contemplated in the Plan. (Author) 13 refs

  8. Europe Unveils 20-Year Plan for Brilliant Future in Astronomy

    Science.gov (United States)

    2008-11-01

    Astronomy is enjoying a golden age of fundamental, exciting discoveries. Europe is at the forefront, thanks to 50 years of progress in cooperation. To remain ahead over the next two to three decades, Europe must prioritise and coordinate the investment of its financial and human resources even more closely. The ASTRONET network, backed by the entire European scientific community, supported by the European Commission, and coordinated by the CNRS, today presents its Roadmap for a brilliant future for European astronomy. ESO's European Extremely Large Telescope is ranked as one of two top-priority large ground-based projects. Astronet and the E-ELT ESO PR Photo 43a/08 The E-ELT Europe is a leader in astronomy today, with the world's most successful optical observatory, ESO's Very Large Telescope, and cutting-edge facilities in radio astronomy and in space. In an unprecedented effort demonstrating the potential of European scientific cooperation, all of European astronomy is now joining forces to define the scientific challenges for the future and construct a common plan to address them in a cost-effective manner. In 2007, a top-level Science Vision was prepared to assess the most burning scientific questions over the next quarter century, ranging from dark energy to life on other planets. European astronomy now presents its Infrastructure Roadmap, a comprehensive 20-year plan to coordinate national and community investments to meet these challenges in a cost-effective manner. The Roadmap not only prioritises the necessary new frontline research facilities from radio telescopes to planetary probes, in space and on the ground, but also considers such key issues as existing facilities, human resources, ICT infrastructure, education and outreach, and cost -- of operations as well as construction. This bold new initiative -- ASTRONET -- was created by the major European funding agencies with support from the European Commission and is coordinated by the National Institute

  9. An Approach to Evaluate Comprehensive Plan and Identify Priority Lands for Future Land Use Development to Conserve More Ecological Values

    Directory of Open Access Journals (Sweden)

    Long Zhou

    2018-01-01

    Full Text Available Urbanization has significant impacts on the regional environmental quality through altering natural lands, converting them to urban built-up areas. One common strategy applied by urban planners to manage urbanization and preserve natural resources is to make a comprehensive plan and concentrate future land use in certain areas. However, in practice, planners used to make future land use planning mainly based on their subjective interpretations with limited ecological supporting evidence and analysis. Here, we propose a new approach composed of ecological modelling and land use zoning in the spatial matrix to evaluate the comprehensive plan and identify priority lands for sustainable land use planning. We use the city of Corvallis, OR, as the test bed to demonstrate this new approach. The results indicate that the Corvallis Comprehensive Plan 1998–2020 featured with compact development is not performing efficiently in conserving ecological values, and the land use plan featured with mixed-use spreading development generated by the proposed approach meets the city’s land demands for urban growth, and conserves 103% more ecological value of retaining storm water nitrogen, 270% more ecological value of retaining storm water phosphorus and 19% more ecological value in storing carbon in the whole watershed. This study indicates that if planned with scientific analysis and evidence, spreading urban development does not necessarily result in less sustainable urban environment than the compact development recommended in smart growth.

  10. The Role of Environmentally Conscious Architecture and Planning As Components of Future National Development Plans in Egypt

    Directory of Open Access Journals (Sweden)

    Karim M. Ayyad

    2013-10-01

    Full Text Available Egypt has been experiencing challenging economic, social and political disturbance during the end of the twentieth century and towards the beginning of the twenty-first. With its fast expanding population, high consumption rate and economic deficit, the Egyptian community continues to experience a low quality of living. These issues contributed greatly to the uprising, following the Tunisian model, in January, 2011. However, the political change that followed did not help a lot, as development strategies are still far from being sustainable. In the beginning of the millennium, Egypt experienced an 8.6% energy deficit, followed by a growing energy crisis [1]. Knowing that almost 50% of the energy produced in Egypt is consumed inside buildings [2], environmentally conscious architecture can be a very powerful tool in development plans, as it can reasonably reduce the consumption of energy and other resources and enhance the quality of living for people. This work analyzes the supposed role of environmentally conscious architecture and, hence, evaluates its importance as a major component of national development plans in the near future. The analysis encompasses a review of the status quo in terms of consumption patterns and required services and, then, compares it with the case in which environmentally conscious architecture is adopted.

  11. Future care planning: a first step to palliative care for all patients with advanced heart disease.

    Science.gov (United States)

    Denvir, M A; Murray, S A; Boyd, K J

    2015-07-01

    Palliative care is recommended for patients with end-stage heart failure with several recent, randomised trials showing improvements in symptoms and quality of life and more studies underway. Future care planning provides a framework for discussing a range of palliative care problems with patients and their families. This approach can be introduced at any time during the patient's journey of care and ideally well in advance of end-of-life care. Future care planning is applicable to a wide range of patients with advanced heart disease and could be delivered systematically by cardiology teams at the time of an unplanned hospital admission, akin to cardiac rehabilitation for myocardial infarction. Integrating cardiology care and palliative care can benefit many patients with advanced heart disease at increased risk of death or hospitalisation. Larger, randomised trials are needed to assess the impact on patient outcomes and experiences. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  12. 78 FR 29655 - Connect America Fund; A National Broadband Plan for Our Future; Establishing Just and Reasonable...

    Science.gov (United States)

    2013-05-21

    ... Fund; A National Broadband Plan for Our Future; Establishing Just and Reasonable Rates for Local Exchange Carriers; High-Cost Universal Service Support AGENCY: Federal Communications Commission. ACTION.... Subpart D--Universal Service Support for High Cost Areas 0 2. In Sec. 54.313, revise paragraph (a)(9...

  13. National Energy Plan II

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-01-01

    This volume contains the Administration's second National Energy Plan, as required by section 801 of the Department of Energy Organization Act (Public Law 95-91). A second volume will contain an assessment of the environmental trends associated with the energy futures reported here. Detailed appendices to the Plan will be published separately. The eight chapters and their subtitles are: Crisis and Uncertainty in the World Energy Future (The Immediate Crisis and the Continuing Problem, The Emergence of the Energy Problem, The Uncertainties of the World Energy Future, World Oil Prices, Consequences for the U.S.); The U.S. Energy Future: The Implications for Policy (The Near-, Mid-, and Long-Term, The Strategy in Perspective); Conservation (Historical Changes in Energy Use, Post-Embargo Changes - In Detail, Conservation Policies and Programs, The Role of Conservation); Oil and Gas (Oil, Natural Gas); Coal and Nuclear (Coal, Nuclear, Policy for Coal and Nuclear Power); Solar and Other Inexhaustible Energy Sources (Solar Energy, Geothermal, Fusion, A Strategy for Inexhaustible Resources); Making Decisions Promptly and Fairly (Managing Future Energy Crises: Emergency Planning, Managing the Current Shortfall: The Iranian Response Plan, Managing the Long-Term Energy Problem: The Institutional Framework, Fairness in Energy Policy, Public Participation in the Development of Energy Policy); and NEP-II and the Future (The Second National Energy Plan and the Nation's Energy Future, The Second National Energy Plan and the Economy, Employment and Energy Policy, The Second National Energy Plan and Individuals, The Second National Energy Plan and Capital Markets, and The Second National Energy Plan and the Environment). (ERA citation 04:041097)

  14. Assessing Future Flood Hazards for Adaptation Planning in a Northern European Coastal Community

    DEFF Research Database (Denmark)

    Sørensen, Carlo Sass; Broge, Niels H.; Molgaard, Mads R.

    2016-01-01

    From a transdisciplinary approach in the town of Thyboron, Denmark, we investigate couplings between sea state (i.e., mean and extreme) and flooding hazards today and ahead. This includes analyses of change and variability in the groundwater table, precipitation, land motion, geotechnical ground ......, and it will provide for more holistic solutions that both serve to protect the town and allow for business development and better municipal planning ahead....... properties, sewerage systems and other infrastructure to outline a more complete platform for the integration of knowledge into climate adaptation schemes at this highly vulnerable coastal location. It involves the engagement of the main stakeholders who, although having different responsibilities, interests......, needs of knowledge and data, and different timeframes for investment and planning, must join in a common appraisal of the challenges faced ahead to provide for better adaptation measures. Apart from obvious adverse effects from future storm surge events, knowledge about the coupled effects...

  15. Planned Environmental Microbiology Aspects of Future Lunar and Mars Missions

    Science.gov (United States)

    Ott, C. Mark; Castro, Victoria A.; Pierson, Duane L.

    2006-01-01

    With the establishment of the Constellation Program, NASA has initiated efforts designed similar to the Apollo Program to return to the moon and subsequently travel to Mars. Early lunar sorties will take 4 crewmembers to the moon for 4 to 7 days. Later missions will increase in duration up to 6 months as a lunar habitat is constructed. These missions and vehicle designs are the forerunners of further missions destined for human exploration of Mars. Throughout the planning and design process, lessons learned from the International Space Station (ISS) and past programs will be implemented toward future exploration goals. The standards and requirements for these missions will vary depending on life support systems, mission duration, crew activities, and payloads. From a microbiological perspective, preventative measures will remain the primary techniques to mitigate microbial risk. Thus, most of the effort will focus on stringent preflight monitoring requirements and engineering controls designed into the vehicle, such as HEPA air filters. Due to volume constraints in the CEV, in-flight monitoring will be limited for short-duration missions to the measurement of biocide concentration for water potability. Once long-duration habitation begins on the lunar surface, a more extensive environmental monitoring plan will be initiated. However, limited in-flight volume constraints and the inability to return samples to Earth will increase the need for crew capabilities in determining the nature of contamination problems and method of remediation. In addition, limited shelf life of current monitoring hardware consumables and limited capabilities to dispose of biohazardous trash will drive flight hardware toward non-culture based methodologies, such as hardware that rapidly distinguishes biotic versus abiotic surface contamination. As missions progress to Mars, environmental systems will depend heavily on regeneration of air and water and biological waste remediation and

  16. Does reading scenarios of future land use changes affect willingness to participate in land use planning?

    Science.gov (United States)

    Michelle L. Johnson; Kathleen P. Bell; Mario F. Teisl

    2016-01-01

    Scenarios of future outcomes often provide context for policy decisions and can be a form of science communication, translating complex and uncertain relationships into stories for a broader audience. We conducted a survey experiment (n = 270) to test the effects of reading land use change scenarios on willingness to participate in land use planning activities. In the...

  17. Demographic development, climatic change, peak oil. Answers to spatial planning, urban planning and traffic planning; Demografische Entwicklung, Klimawandel, Peak Oil. Antworten der Raum-, Stadt- und Verkehrsplanung

    Energy Technology Data Exchange (ETDEWEB)

    Huber, Felix

    2011-07-01

    The demographic trends, climate change and peak oil are highly sensitive issues politically. With fears about the future and the curiosity on the future attention can be aroused. Therefore, the author of the contribution under consideration reports on the following aspects: (1) Why should we deal with future challenges?; (2) Presentation of the tools of spatial planning, urban planning and transportation planning in the context of the particular requirements of their time; (3) Clarification of the requirements to future tools; (4) Presentation of the future tasks of spatial planning and the changes in lifestyle.

  18. Performance of the ATLAS Liquid Argon Calorimeter After Three Years of LHC Operation and Plans for a Future Upgrade

    CERN Document Server

    Ilic, N; The ATLAS collaboration

    2013-01-01

    Performance of the Liquid Argon Calorimeter during three years of LHC operation is presented. Upgrades and plans for future upgrades in order to prepare the LAr calorimeter for higher luminosity are presented.

  19. Future plan of ITER

    International Nuclear Information System (INIS)

    Kitsunezaki, Akio

    1998-01-01

    In cooperation of four countries, Japan, USA, EU and Russia, ITER plan has been proceeding as ''the conceptual design activities'' from 1988 to 1990 and ''the industrial design activities'' since 1992. To construct ITER, the legal and work side of ITER operation has been investigated by four countries. However, their economic conditions have been changed to be wrong. So that, construction of ITER can not begin after end of industrial design activities in 1998. Accordingly, they determined to continue the industrial design activities more three years in order to study low cost options and to test the superconductive model·coil. (S.Y.)

  20. Status of MAD (version 8.5) and future plans

    International Nuclear Information System (INIS)

    Iselin, F.C.

    1993-01-01

    The MAD computer code project was started in 1981 at the European Organization for Nuclear Research (CERN) to provide a flexible framework for particle optical computations. From the beginning various features were considered important. Open-ended and modular design of the program would allow easy addition of new features. Format-free input language would facilitate data preparation. Later the requirement was added that the language should be understood by a variety of other programs. When moving data to other programs this would avoid extensive translations of the data with the corresponding danger of making errors. The internal data structure would describe the machine in a flexible manner and access to this structure should be simple. The program should be easy to maintain. Canonical variables should be used throughout the computations. All these features should not hamper the computational efficiency. This article describes the features of the MAD code. This is followed by two sections giving a general description of the ''standard input language'' and extensions to this language. Finally the data structures introduced and future plans are summarized. (Author)

  1. Technology Implementation Plan

    DEFF Research Database (Denmark)

    Jensen, Karsten Ingerslev; Schultz, Jørgen Munthe

    The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential.......The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential....

  2. Patient preferences for future care - how can Advance Care Planning become embedded into dementia care: a study protocol

    OpenAIRE

    Robinson, Louise; Bamford, Claire; Beyer, Fiona; Clark, Alexa; Dickinson, Claire; Emmet, Charlotte; Exley, Catherine; Hughes, Julian; Robson, Lesley; Rousseau, Nikki

    2010-01-01

    Abstract Background People living with a long term condition may wish to be able to plan ahead, so that if in future they cannot make decisions, their wishes about their care will be known; this process is termed Advance Care Planning (ACP). In dementia, guidance stipulates that ACP discussions should take place whilst the person still has capacity to make decisions. However there is a lack of evidence on the effectiveness of ACP in influencing patient choice and resource use. The aims of thi...

  3. A national survey of residents in combined Internal Medicine and Dermatology residency programs: educational experience and future plans.

    Science.gov (United States)

    Mostaghimi, Arash; Wanat, Karolyn; Crotty, Bradley H; Rosenbach, Misha

    2015-10-16

    In response to a perceived erosion of medical dermatology, combined internal medicine and dermatology programs (med/derm) programs have been developed that aim to train dermatologists who take care of medically complex patients. Despite the investment in these programs, there is currently no data with regards to the potential impact of these trainees on the dermatology workforce. To determine the experiences, motivations, and future plans of residents in combined med/derm residency programs. We surveyed residents at all United States institutions with both categorical and combined training programs in spring of 2012. Respondents used visual analog scales to rate clinical interests, self-assessed competency, career plans, and challenges. The primary study outcomes were comfort in taking care of patients with complex disease, future practice plans, and experience during residency. Twenty-eight of 31 med/derm residents (87.5%) and 28 of 91 (31%) categorical residents responded (overall response rate 46%). No significant differences were seen in self-assessed dermatology competency, or comfort in performing inpatient consultations, cosmetic procedures, or prescribing systemic agents. A trend toward less comfort in general dermatology was seen among med/derm residents. Med/derm residents were more likely to indicate career preferences for performing inpatient consultation and taking care of medically complex patients. Categorical residents rated their programs and experiences more highly. Med/derm residents have stronger interests in serving medically complex patients. Categorical residents are more likely to have a positive experience during residency. Future work will be needed to ascertain career choices among graduates once data are available.

  4. Planning for the future : the role of mobility in residential and lifestyle choices of baby boomers and older adults.

    Science.gov (United States)

    2013-06-01

    This study explores the extent to which Baby Boomers and older adults take mobility and : transportation issues into consideration as they make individual residential and lifestyle plans for : their future older years. While transportation and urban ...

  5. Strategic planning for marketers.

    Science.gov (United States)

    Wilson, I

    1978-12-01

    The merits of strategic planning as a marketing tool are discussed in this article which takes the view that although marketers claim to be future-oriented, they focus too little attention on long-term planning and forecasting. Strategic planning, as defined by these authors, usually encompasses periods of between five and twenty-five years and places less emphasis on the past as an absolute predictor of the future. It takes a more probabilistic view of the future than conventional marketing strategy and looks at the corporation as but one component interacting with the total environment. Inputs are examined in terms of environmental, social, political, technological and economic importance. Because of its futuristic orientation, an important tenant of strategic planning is the preparation of several alternative scenarios ranging from most to least likely. By planning for a wide-range of future market conditions, a corporation is more able to be flexible by anticipating the course of future events, and is less likely to become a captive reactor--as the authors believe is now the case. An example of strategic planning at General Elecric is cited.

  6. Latest experiences and future plans on NSLS-II insertion devices

    Energy Technology Data Exchange (ETDEWEB)

    Tanabe, T.; Hidaka, Y.; Kitegi, C.; Hidas, D.; Musardo, M.; Harder, D. A.; Rank, J.; Cappadoro, P.; Fernandes, H.; Corwin, T. [Energy Sciences Directorate, Brookhaven National Laboratory, Upton, NY 11973, U.S.A (United States)

    2016-07-27

    National Synchrotron Light Source-II (NSLS-II) is the latest storage ring of 3 GeV energy at the Brookhaven National Laboratory (BNL). The horizontal emittance of the electron beam with the currently installed six damping wigglers is 0.9 nm.rad, which could be further reduced to 0.5 nm.rad with more insertion devices (IDs). With only one RF cavity the beam current is restricted to 200 mA. Five hundred mA operation is envisaged for next year with an addition of the second cavity. Six (plus two branches) beamlines have been commissioned in the initial phase of the project. In July 2015, three NIH funded beamlines called “Advanced Beamlines for Biological Investigations with X-rays” (ABBIX) will be added for operation. This paper describes the experiences of ID development, installation, and commissioning for the NSLS-II project as well as our future plans to improve the performance of the facility in terms of source development.

  7. Allocating time to future tasks: the effect of task segmentation on planning fallacy bias.

    Science.gov (United States)

    Forsyth, Darryl K; Burt, Christopher D B

    2008-06-01

    The scheduling component of the time management process was used as a "paradigm" to investigate the allocation of time to future tasks. In three experiments, we compared task time allocation for a single task with the summed time allocations given for each subtask that made up the single task. In all three, we found that allocated time for a single task was significantly smaller than the summed time allocated to the individual subtasks. We refer to this as the segmentation effect. In Experiment 3, we asked participants to give estimates by placing a mark on a time line, and found that giving time allocations in the form of rounded close approximations probably does not account for the segmentation effect. We discuss the results in relation to the basic processes used to allocate time to future tasks and the means by which planning fallacy bias might be reduced.

  8. Future high school teachers' difficulties and alternatives found to planning electromagnetism activities designed for visual handicapped students

    Directory of Open Access Journals (Sweden)

    Eder Pires de Camargo

    2007-03-01

    Full Text Available We report here partial outcomes of a study aimed to verify future High School teachers' performance when, during the development of a called "Teaching Practice" undergraduate course, were asked to plan, elaborate and teach, in classroom situations, electromagnetism topics to a students class which included visual handicapped pupils. Data analyzed show that the main difficulties presented by the future Physics High School teachers are related to the approach to know physics phenomena as dependent of vision and to break with some elements of the traditional pedagogy. By other hand, as alternatives, future teachers showed creativity in order to surpass passive aptitudes related to this educational problem, working out methodological strategies deprived of the relation knowing/seeing, as well as, the work with orality in a physics education context.

  9. Our future energy

    Energy Technology Data Exchange (ETDEWEB)

    2011-11-15

    The Danish Government's plan ''Our Future Energy'' seeks to create green growth and help the country convert to 100 percent renewable energy use by 2050. The Danish Government in November 2011 presented its plan for how the country can secure its energy future. Titled ''Our Future Energy'', the strategy presents specific measures for fulfilling the Government's goal of stimulating green growth. The plan is based on the previous government's Energy Strategy 2050, but raises the bar higher. The long-term goal of the plan is to implement an energy and transport network that relies solely on renewable energy sources. By 2020, the initiatives will lead to extensive reductions in energy consumption, making it possible for half of the country's electricity consumption to be covered by wind power. Coal is to be phased out of Danish power plants by 2030. And by 2035, all electricity and heating will be generated using renewable sources. (Author)

  10. Thinking Ahead: Improving Support for People with Learning Disabilities and Their Families to Plan for the Future

    Science.gov (United States)

    Towers, Christine

    2013-01-01

    The increasing life expectancy of people with learning disabilities makes it imperative that families plan for the future. The number of people with learning disabilities over the age of 65 is predicted to double over the next two decades. The greatest increase in life expectancy will be amongst people with mild learning disabilities who will have…

  11. Shippingport Atomic Power Station Operating Experience, Developments and Future Plans

    International Nuclear Information System (INIS)

    Feinroth, H.; Oldham, G.M.; Stiefel, J.T.

    1963-01-01

    This paper describes and evaluates five years of operation and test of the Shippingport Atomic Power Station and discusses the current technical developments and future plans of the Shippingport programme. This programme is directed towards development of the basic technology of light-water reactors to provide the basis for potential reduction in the costs of nuclear power. The Shippingport reactor plant has operated for over five years and has been found to integrate readily into a utility system either as a base load or peak load unit. Plant component performance has been reliable. There have been no problems in contamination or waste disposal. Access to primary coolant components for maintenance has been good, demonstrating the integrity of fuel elements. Each of the three refuelling operations performed since start-up of Shippingport has required successively less time to accomplish. Recently, the third seed was refuelled in 32 working days, about one quarter the time required for the first refuelling. The formal requirements of personnel training, written administrative procedures, power plant manuals, etc., which have been a vital factor in the successful implementation of the Shippingport programme, are described. The results obtained from the comprehensive test programme carried out at Shippingport are compared with calculations, and good agreement has been obtained. Reactor core performance, plant stability, and response to load changes, fuel element and control rod performance, long-term effects such as corrosion and radiation level build-up, component performance, etc., are discussed in this paper. The principal objective of the current and future programmes of the Shippingport Project in advancing the basic technology of water-cooled reactors is discussed. This programme includes the continued operation of the Shippingport plant, and the development, design, manufacture and test operation of a long-life, highpower density second core - Core 2. At its

  12. Planning and Response to the Detonation of an Improvised Nuclear Device: Past, Present, and Future Research

    Energy Technology Data Exchange (ETDEWEB)

    Bentz, A

    2008-07-31

    While the reality of an improvised nuclear device (IND) being detonated in an American city is unlikely, its destructive power is such that the scenario must be planned for. Upon reviewing the academic literature on the effects of and response to IND events, this report looks to actual responders from around the country. The results from the meetings of public officials in the cities show where gaps exist between theoretical knowledge and actual practice. In addition to the literature, the meetings reveal areas where future research needs to be conducted. This paper recommends that local response planners: meet to discuss the challenges of IND events; offer education to officials, the public, and responders on IND events; incorporate 'shelter-first' into response plans; provide information to the public and responders using the 3 Cs; and engage the private sector (including media) in response plans. In addition to these recommendations for the response planners, the paper provides research questions that once answered will improve response plans around the country. By following the recommendations, both groups, response planners and researchers, can help the country better prepare for and mitigate the effects of an IND detonation.

  13. Planning and Response to the Detonation of an Improvised Nuclear Device: Past, Present, and Future Research

    International Nuclear Information System (INIS)

    Bentz, A.

    2008-01-01

    While the reality of an improvised nuclear device (IND) being detonated in an American city is unlikely, its destructive power is such that the scenario must be planned for. Upon reviewing the academic literature on the effects of and response to IND events, this report looks to actual responders from around the country. The results from the meetings of public officials in the cities show where gaps exist between theoretical knowledge and actual practice. In addition to the literature, the meetings reveal areas where future research needs to be conducted. This paper recommends that local response planners: meet to discuss the challenges of IND events; offer education to officials, the public, and responders on IND events; incorporate 'shelter-first' into response plans; provide information to the public and responders using the 3 Cs; and engage the private sector (including media) in response plans. In addition to these recommendations for the response planners, the paper provides research questions that once answered will improve response plans around the country. By following the recommendations, both groups, response planners and researchers, can help the country better prepare for and mitigate the effects of an IND detonation

  14. Planning documents: a business planning strategy.

    Science.gov (United States)

    Kaehrle, P A

    2000-06-01

    Strategic planning and business plan development are essential nursing management skills in today's competitive, fast paced, continually changing health care environment. Even in times of great uncertainty, nurse managers need to plan and forecast for the future. A well-written business plan allows nurse managers to communicate their expertise and proactively contribute to the programmatic decisions and changes occurring within their patient population or service area. This article presents the use of planning documents as a practical, strategic business planning strategy. Although the model addresses orthopedic services specifically, nurse managers can gain an understanding and working knowledge of planning concepts that can be applied to all patient populations.

  15. Family members and health professionals' perspectives on future life planning of ageing people with Down syndrome: a qualitative study.

    Science.gov (United States)

    Covelli, Venusia; Raggi, Alberto; Paganelli, Chiara; Leonardi, Matilde

    2017-08-08

    To address the way in which primary caregivers of people over 45 with Down syndrome describe daily life activities and context and foresee their future. Thirteen family members and 15 health professionals participated to four focus groups. Meaningful concepts were identified and linked to the International Classification of Functioning, Disability and Health using established linking rules. A total of 258 relevant concepts were identified and linked to 75 categories of the classification: 38 were from activity and participation and 17 from environmental factors domains. The most commonly reported issues were mental functions (b117-intellectual functions and b152-emotional functions), community life activities (d910-community life and d920-recreation and leisure) and environmental factors (e310-support of immediate family, e355-support from health professionals and e555-associations and organizational services). Information on the daily life and health of ageing people with Down syndrome is important to plan social and health care interventions tailored to deal with problems that they may encounter in older age. Considering the interaction between health and environment and maintaining a continuity of daily routines were reported as the most relevant topics for managing daily lives of persons with Down syndrome in older ages. Implications for rehabilitation Pay more attention to the interaction between environmental factors and health condition in ageing people with Down syndrome. Information about the life contest are important in order to plan present and future social-health care interventions. Future planning for people with Down syndrome is a great concern for family members.

  16. ALARA database value in future outage work planning and dose management

    International Nuclear Information System (INIS)

    Miller, D.W.; Green, W.H.

    1995-01-01

    ALARA database encompassing job-specific duration and man-rem plant specific information over three refueling outages represents an invaluable tool for the outage work planner and ALARA engineer. This paper describes dose-management trends emerging based on analysis of three refueling outages at Clinton Power Station. Conclusions reached based on hard data available from a relational database dose-tracking system is a valuable tool for planning of future outage work. The system's ability to identify key problem areas during a refueling outage is improving as more outage comparative data becomes available. Trends over a three outage period are identified in this paper in the categories of number and type of radiation work permits implemented, duration of jobs, projected vs. actual dose rates in work areas, and accuracy of outage person-rem projection. The value of the database in projecting 1 and 5 year station person-rem estimates is discussed

  17. ALARA database value in future outage work planning and dose management

    Energy Technology Data Exchange (ETDEWEB)

    Miller, D.W.; Green, W.H. [Clinton Power Station Illinois Power Co., IL (United States)

    1995-03-01

    ALARA database encompassing job-specific duration and man-rem plant specific information over three refueling outages represents an invaluable tool for the outage work planner and ALARA engineer. This paper describes dose-management trends emerging based on analysis of three refueling outages at Clinton Power Station. Conclusions reached based on hard data available from a relational database dose-tracking system is a valuable tool for planning of future outage work. The system`s ability to identify key problem areas during a refueling outage is improving as more outage comparative data becomes available. Trends over a three outage period are identified in this paper in the categories of number and type of radiation work permits implemented, duration of jobs, projected vs. actual dose rates in work areas, and accuracy of outage person-rem projection. The value of the database in projecting 1 and 5 year station person-rem estimates is discussed.

  18. Status and future plan of KUR-ISOL for new isotope search

    Energy Technology Data Exchange (ETDEWEB)

    Taniguchi, Akihiro [Kyoto Univ., Kumatori, Osaka (Japan). Research Reactor Inst.

    1997-07-01

    He gas-jet type ISOL (KUR-ISOL: Kyoto University Reactor-Isotope Separator On-Line) was set up in Kyoto University Reactor in 1979. The thema of researches using KUR-ISOL are investigation of new isotope elements, study of nuclear structure of neutron-enrich nucleide in the neighborhood of 150 of mass number, development of unstable nuclide production unit and research of physical properties using unstable nuclide as probe. By KUR-ISOL, four kinds of new isotopes such as {sup 156}Pm, {sup 155}Nd, {sup 154}Pr and {sup 152}Ce and {beta}-decay of {sup 150}La had been identified. {beta}-decay of {sup 150}La as a sample of them was explained in this report. Today, the experiment of {sup 153}Pr, {sup 152}Pr and {sup 149,150}Ce are proceeding. For future plans, new beam line and new target used transuranic elements will be developed. (S.Y.)

  19. Air quality and future energy system planning

    Science.gov (United States)

    Sobral Mourao, Zenaida; Konadu, Dennis; Lupton, Rick

    2016-04-01

    energy system planning. Some example applications of this work are: (1) to discover conflicts and synergies between air quality regulations and future developments in the energy system and land use change; (2) to show the drivers of air quality in a given spatial context; (3) to explore effective ways to visualize impacts of different energy, land use and emissions control policies on air quality. An initial test case for the Bay Area in California will be presented, extending the scope of the existing California ForeseerTM tool to identify impacts of different policies within the water-energy-land nexus on local air quality.

  20. Future Career Plans and Practice Patterns of Canadian Obstetrics and Gynaecology Residents in 2011.

    Science.gov (United States)

    Burrows, Jason; Coolen, Jillian

    2016-01-01

    The practice patterns of Obstetricians and Gynaecologists continue to evolve with each new generation of physicians. Diversifying subspecialties, changes in resident duty hours, job market saturation, and desire for work-life balance are playing stronger roles. Professional practice direction and needs assessment may be aided by awareness of future Obstetrics and Gynaecology physician career plans and expectations. The objective of this study was to determine the expected career plans and practice patterns of Canadian Obstetrics and Gynaecology residents following residency. The SOGC Junior Member Committee administered its third career planning survey to Canadian Obstetrics and Gynaecology residents electronically in December 2011. The data collected was statistically analyzed and compared to previous surveys. There were 183 responses giving a response rate of 43%. More than one half of all residents were considering postgraduate training (58%). Projected practice patterns included: 84% maintaining obstetrical practice, 60% locuming, and 50% job-sharing. The majority of residents expected to work in a 6 to 10 person call group (48%), work 3 to 5 call shifts per month (72%), work 41 to 60 hours weekly (69%), and practise in a city with a population greater than 500 000 (45%). Only 18% of residents surveyed were in favour of streaming residency programs in Obstetrics and Gynaecology. Canadian resident career plan and expected practice pattern assessment remains an important tool for aiding in resource allocation and strategic development of care and training in Obstetrics and Gynaecology in Canada. Copyright © 2016 Society of Obstetricians and Gynaecologists of Canada. Published by Elsevier Inc. All rights reserved.

  1. Operating plan FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  2. Future Climate Analysis

    International Nuclear Information System (INIS)

    James Houseworth

    2001-01-01

    This Analysis/Model Report (AMR) documents an analysis that was performed to estimate climatic variables for the next 10,000 years by forecasting the timing and nature of climate change at Yucca Mountain (YM), Nevada (Figure 1), the site of a potential repository for high-level radioactive waste. The future-climate estimates are based on an analysis of past-climate data from analog meteorological stations, and this AMR provides the rationale for the selection of these analog stations. The stations selected provide an upper and a lower climate bound for each future climate, and the data from those sites will provide input to the infiltration model (USGS 2000) and for the total system performance assessment for the Site Recommendation (TSPA-SR) at YM. Forecasting long-term future climates, especially for the next 10,000 years, is highly speculative and rarely attempted. A very limited literature exists concerning the subject, largely from the British radioactive waste disposal effort. The discussion presented here is one method, among many, of establishing upper and lower bounds for future climate estimates. The method used here involves selecting a particular past climate from many past climates, as an analog for future climate. Other studies might develop a different rationale or select other past climates resulting in a different future climate analog. Revision 00 of this AMR was prepared in accordance with the ''Work Direction and Planning Document for Future Climate Analysis'' (Peterman 1999) under Interagency Agreement DE-AI08-97NV12033 with the U.S. Department of Energy (DOE). The planning document for the technical scope, content, and management of ICN 01 of this AMR is the ''Technical Work Plan for Unsaturated Zone (UZ) Flow and Transport Process Model Report'' (BSC 2001a). The scope for the TBV resolution actions in this ICN is described in the ''Technical Work Plan for: Integrated Management of Technical Product Input Department''. (BSC 2001b, Addendum B

  3. Future Climate Analysis

    Energy Technology Data Exchange (ETDEWEB)

    James Houseworth

    2001-10-12

    This Analysis/Model Report (AMR) documents an analysis that was performed to estimate climatic variables for the next 10,000 years by forecasting the timing and nature of climate change at Yucca Mountain (YM), Nevada (Figure 1), the site of a potential repository for high-level radioactive waste. The future-climate estimates are based on an analysis of past-climate data from analog meteorological stations, and this AMR provides the rationale for the selection of these analog stations. The stations selected provide an upper and a lower climate bound for each future climate, and the data from those sites will provide input to the infiltration model (USGS 2000) and for the total system performance assessment for the Site Recommendation (TSPA-SR) at YM. Forecasting long-term future climates, especially for the next 10,000 years, is highly speculative and rarely attempted. A very limited literature exists concerning the subject, largely from the British radioactive waste disposal effort. The discussion presented here is one method, among many, of establishing upper and lower bounds for future climate estimates. The method used here involves selecting a particular past climate from many past climates, as an analog for future climate. Other studies might develop a different rationale or select other past climates resulting in a different future climate analog. Revision 00 of this AMR was prepared in accordance with the ''Work Direction and Planning Document for Future Climate Analysis'' (Peterman 1999) under Interagency Agreement DE-AI08-97NV12033 with the U.S. Department of Energy (DOE). The planning document for the technical scope, content, and management of ICN 01 of this AMR is the ''Technical Work Plan for Unsaturated Zone (UZ) Flow and Transport Process Model Report'' (BSC 2001a). The scope for the TBV resolution actions in this ICN is described in the ''Technical Work Plan for: Integrated Management of Technical

  4. Using VE to Strategically Plan Our Future

    Energy Technology Data Exchange (ETDEWEB)

    Margie Jeffs; Lori Braase; Alison Conner; Darcie Martinson; Jodi Grgich

    2009-06-01

    The Value Engineering (VE) Methodology is an effective tool for business or project strategic planning. In conjunction with the “Balanced Scorecard Approach” (Drs. Robert Kaplan, PhD, and David Norton, PhD, from the Balanced Scorecard Collaborative/Palladium Group), function analysis can be used to develop strategy maps and scorecards. The FAST diagram provides an integrated approach to strategy map development by formulating a cause and effect relationship and establishing the “how” and “why” behind the strategy map. By utilizing the VE Job Plan, one is able to move from strategic thinking all the way through to execution of the strategy.

  5. Nuclear Fuel Cycle Technologies: Current Challenges and Future Plans - 12558

    Energy Technology Data Exchange (ETDEWEB)

    Griffith, Andrew [U.S. Department of Energy, Washington, DC (United States)

    2012-07-01

    The mission of the Office of Nuclear Energy's Fuel Cycle Technologies office (FCT program) is to provide options for possible future changes in national nuclear energy programs. While the recent draft report of the Blue Ribbon Commission on America's Nuclear Future stressed the need for organization changes, interim waste storage and the establishment of a permanent repository for nuclear waste management, it also recognized the potential value of alternate fuel cycles and recommended continued research and development in that area. With constrained budgets and great expectations, the current challenges are significant. The FCT program now performs R and D covering the entire fuel cycle. This broad R and D scope is a result of the assignment of new research and development (R and D) responsibilities to the Office of Nuclear Energy (NE), as well as reorganization within NE. This scope includes uranium extraction from seawater and uranium enrichment R and D, used nuclear fuel recycling technology, advanced fuel development, and a fresh look at a range of disposal geologies. Additionally, the FCT program performs the necessary systems analysis and screening of fuel cycle alternatives that will identify the most promising approaches and areas of technology gaps. Finally, the FCT program is responsible for a focused effort to consider features of fuel cycle technology in a way that promotes nonproliferation and security, such as Safeguards and Security by Design, and advanced monitoring and predictive modeling capabilities. This paper and presentation will provide an overview of the FCT program R and D scope and discuss plans to analyze fuel cycle options and support identified R and D priorities into the future. The FCT program is making progress in implanting a science based, engineering driven research and development program that is evaluating options for a sustainable fuel cycle in the U.S. Responding to the BRC recommendations, any resulting legislative

  6. Applying comprehensive environmental assessment to research planning for multiwalled carbon nanotubes: Refinements to inform future stakeholder engagement.

    Science.gov (United States)

    Powers, Christina M; Grieger, Khara; Meacham, Connie A; Gooding, Meredith Lassiter; Gift, Jeffrey S; Lehmann, Geniece M; Hendren, Christine O; Davis, J Michael; Burgoon, Lyle

    2016-01-01

    Risk assessments and risk management efforts to protect human health and the environment can benefit from early, coordinated research planning by researchers, risk assessors, and risk managers. However, approaches for engaging these and other stakeholders in research planning have not received much attention in the environmental scientific literature. The Comprehensive Environmental Assessment (CEA) approach under development by the United States Environmental Protection Agency (USEPA) is a means to manage complex information and input from diverse stakeholder perspectives on research planning that will ultimately support environmental and human health decision making. The objectives of this article are to 1) describe the outcomes of applying lessons learned from previous CEA applications to planning research on engineered nanomaterial, multiwalled carbon nanotubes (MWCNTs) and 2) discuss new insights and refinements for future efforts to engage stakeholders in research planning for risk assessment and risk management of environmental issues. Although framed in terms of MWCNTs, this discussion is intended to enhance research planning to support assessments for other environmental issues as well. Key insights for research planning include the potential benefits of 1) ensuring that participants have research, risk assessment, and risk management expertise in addition to diverse disciplinary backgrounds; 2) including an early scoping step before rounds of formal ratings; 3) using a familiar numeric scale (e.g., US dollars) versus ordinal rating scales of "importance"; 4) applying virtual communication tools to supplement face-to-face interaction between participants; and 5) refining criteria to guide development of specific, actionable research questions. © 2015 SETAC.

  7. USGCRP's Sustained Assessment Process: Progress to date and future plans

    Science.gov (United States)

    DeAngelo, B. J.; Reidmiller, D.; Lipschultz, F.; Cloyd, E. T.

    2016-12-01

    One of the four main objectives of the U.S. Global Change Research Program's (USGCRP's) Strategic Plan is to "Conduct Sustained Assessments", which seeks to build a process that synthesizes and advances the state of scientific knowledge on global change, develops future scenarios and potential impacts, and evaluates how effectively science is being and can be used to inform and support the Nation's response to climate change. To do so, USGCRP strives to establish a standing capacity to conduct national climate assessments with sectoral and regional information to evaluate climate risks and opportunities, and to inform decision-making, especially with regard to resiliency planning and adaptation measures. Building on the success of the 3rd National Climate Assessment (NCA) (2014), we discuss the range of USGCRP activities that embody the sustained assessment concept. Special reports, such as the recent Climate and Human Health Assessment and upcoming Climate Science Special Report, fill gaps in our understanding and provide crucial building blocks for next NCA report (NCA4). To facilitate the use of consistent assumptions across NCA4, new scenario products for climate, population, and land use will be made available through initiatives such as NOAA's Climate Resilience Toolkit. NCA4 will be informed by user engagement to advance the customization of knowledge. The report will strive to advance our ability to quantify various risks, monetize certain impacts, and communicate the benefits (i.e., avoided impacts) of various mitigation pathways. NCAnet (a national network of climate-interested stakeholders) continues to grow and foster collaborations across levels of governance and within civil society. Finally, USGCRP continues to actively engage with other assessment processes, at international, state, city, and tribal levels, to exchange ideas and to facilitate the potential for "linked" assessments across spatial scales.

  8. Mobilities, Futures & the City

    DEFF Research Database (Denmark)

    Freudendal-Pedersen, Malene; Kesselring, Sven

    2016-01-01

    significant attention to these shifts in societies’ discursive patterns and structures. For making up powerful and strong visions and policies for sustainable cities, ‘collaborative storytelling’ plays a key role. The theoretical outset for the research project ‘Mobilities, Futures & the City’, which grounds......The future of cities and regions will be strongly shaped by the mobilities of people, goods, modes of transport, waste and information. In many ways, the ‘why and ‘for what’ often get lost in discourses on planning and designing mobilities. The predominant planning paradigm still conceptualizes...... the future of cities and mobilities as a matter of rather more efficient technologies than of social cohesion, integration and connectivity. Sustainable mobility needs the mobilities of ideas and concepts and the reflexivity of policies. Communicative planning theory and the ‘argumentative turn’ have given...

  9. Executive Summary - Future plans

    International Nuclear Information System (INIS)

    2005-01-01

    Our Institute has sufficient scientific potential to play a key role in the field of particle physics, nuclear physics and in several aspects of solid state and applied physics, at least in our part of Europe. We believe the Institute should continue its present mode of operation, where basic research, closely coordinated through our collaboration with leading laboratories all over the world, stimulates our interdisciplinary research and technology transfer to the industry. If our present scientific potential is matched by suitably modernized infrastructure, we should be able to acquire the critical mass necessary for further effective development. In order to maintain our present world-level research, we have to continue and further extend our participation in large international collaborations, in the construction of large detectors and to seek further financial support from EU and international organizations. For experimental particle physics, our priorities remain in collaborating with major European and world laboratories such as CERN, DESY, Gran Sasso, Fermilab, KEK, SLAC and with laboratories developing astrophysics experiments, such as the PIERRE AUGER experiment. Collaboration in the field of nuclear physics, physics of condensed matter, theoretical physics and interdisciplinary research should be continued with leading European laboratories offering access to large accelerator facilities (such as GANIL or GSI), to synchrotron radiation or to unique polarized neutron beams, such as those available at ILL Grenoble. An exiting new frontier in research for our research teams will be opened by the X-ray Free Electron Laser (XFEL) in DESY and the future International Linear Collider. We will be able to further invest towards upgrading our small-scale facilities, such as the infrastructure around the Van de Graaff accelerator, in order to perform single-ion beam experiments, or around the AIC-144 cyclotron, to treat ocular melanoma, in close collaboration with

  10. The Radioactive Ion Beams in Brazil (RIBRAS) facility. Description, program, main results, future plans

    Science.gov (United States)

    Lépine-Szily, A.; Lichtenthäler, R.; Guimarães, V.

    2014-08-01

    RIBRAS (Radioactive Ion Beams in Brazil) is a facility installed at the Institute of Physics of the University of São Paulo (IFUSP), Brazil. The RIBRAS system consists of two superconducting solenoids and uses the "in-flight method" to produce radioactive ion beams using the primary beam provided by the 8UD Pelletron Tandem of IFUSP. The ion beams produced so far by RIBRAS are 6He, 8Li, 7Be, 10Be, 8B, 12B with intensities that can vary from 104 to 106 pps. Initially the experimental program covered the study of elastic and inelastic scattering with the objective to study the interaction potential and the reaction mechanisms between weakly bound (RIB) and halo (6He and 8B projectiles on light, medium and heavy mass targets. With highly purified beams, the study of resonant elastic scattering and resonant transfer reactions, using inverse kinematics and thick targets, has also been included in our experimental program. Also, transfer reactions of astrophysical interest and fusion reactions induced by halo nuclei are part of the near-future research program. Our recent results on elastic scattering, alpha-particle production and total reaction cross sections, as well as the resonant elastic and transfer reactions, are presented. Our plans for the near future are related to the installation of a new beam line and a cave for gamma-ray detection. We intend to place in operation a large area neutron detector available in our laboratory. The long-range plans could be the move of the RIBRAS system to the more energetic beam line of the LINAC post-accelerator (10MeV/nucleon primary beams) still in construction in our laboratory.

  11. Outline of Fukushima nuclear accident and future action. Lessons learned from accident and countermeasure plan

    International Nuclear Information System (INIS)

    Fukuda, Toshihiko

    2012-01-01

    Fukushima nuclear accident was caused by loss of all AC power sources (SBO) and loss of ultimate heat sink (LUHS) at Fukushima Daiichi Nuclear Power Plants (NPPs) hit by the Great East Japan Earthquake. This article reviewed outline of Fukushima nuclear accident progression when on year had passed since and referred to lessons learned from accident and countermeasure plan to prevent severe accident in SBO and LUHS events by earthquake and tsunami as future action. This countermeasure would be taken to (1) prevent serious flooding in case a tsunami overwhelms the breakwater, with improving water tightness of rooms for emergency diesel generator, batteries and power centers, (2) enhance emergency power supply and cooling function with mobile electricity generator, high pressure fire pump car and alternate water supply source, (3) mitigate environmental effects caused by core damage with installing containment filtered venting, and (4) enforce emergency preparedness in case of severe accident. Definite countermeasure plan for Kashiwazaki-Kariwa NPPs was enumerated. (T. Tanaka)

  12. Long-range planning cost model for support of future space missions by the deep space network

    Science.gov (United States)

    Sherif, J. S.; Remer, D. S.; Buchanan, H. R.

    1990-01-01

    A simple model is suggested to do long-range planning cost estimates for Deep Space Network (DSP) support of future space missions. The model estimates total DSN preparation costs and the annual distribution of these costs for long-range budgetary planning. The cost model is based on actual DSN preparation costs from four space missions: Galileo, Voyager (Uranus), Voyager (Neptune), and Magellan. The model was tested against the four projects and gave cost estimates that range from 18 percent above the actual total preparation costs of the projects to 25 percent below. The model was also compared to two other independent projects: Viking and Mariner Jupiter/Saturn (MJS later became Voyager). The model gave cost estimates that range from 2 percent (for Viking) to 10 percent (for MJS) below the actual total preparation costs of these missions.

  13. Urban Growth Dynamics in Perth, Western Australia: Using Applied Remote Sensing for Sustainable Future Planning

    Directory of Open Access Journals (Sweden)

    Andrew MacLachlan

    2017-01-01

    Full Text Available Earth observation data can provide valuable assessments for monitoring the spatial extent of (unsustainable urban growth of the world’s cities to better inform planning policy in reducing associated economic, social and environmental costs. Western Australia has witnessed rapid economic expansion since the turn of the century founded upon extensive natural resource extraction. Thus, Perth, the state capital of Western Australia, has encountered significant population and urban growth in response to the booming state economy. However, the recent economic slowdown resulted in the largest decrease in natural resource values that Western Australia has ever experienced. Here, we present multi-temporal urban expansion statistics from 1990 to 2015 for Perth, derived from Landsat imagery. Current urban estimates used for future development plans and progress monitoring of infill and density targets are based upon aggregated census data and metrics unrepresentative of actual land cover change, underestimating overall urban area. Earth observation provides a temporally consistent methodology, identifying areal urban area at higher spatial and temporal resolution than current estimates. Our results indicate that the spatial extent of the Perth Metropolitan Region has increased 45% between 1990 and 2015, over 320 km2. We highlight the applicability of earth observation data in accurately quantifying urban area for sustainable targeted planning practices.

  14. Present status and future plans of the study for preparation of Pu reference materials

    International Nuclear Information System (INIS)

    Sumi, Mika; Kageyama, Tomio; Suzuki, Toru

    2007-01-01

    All accountancy analysis at the Plutonium Fuel Development Center of JAEA is performed by isotope dilution mass spectrometry with well-characterized standard materials. Though Pu reference materials has been supplied from foreign country, importing those Pu materials is gradually becoming more difficult and may be almost impossible to import them in future. Thus, in order to establish the capability and expertise for the preparation of Pu reference materials, JAEA has started collaborative work with NBL who has high skills for preparing and supplying nuclear reference materials for long periods. One of the targets of this collaboration is preparation of standard material for IDMS (LSD spike). MOX powder which has been stored in JAEA was dissolved and Purified to obtain Pu solution. A small portion of the Purified solution was transported to NBL for analysis. LSD spike will be prepared from this Pu solution and then validation analysis and performance test including stability test will be performed with NBL and JAEA. This report presents status and future plans for the collaboration work. (author)

  15. Program planning for future improvement in managing ORNL's radioactive wastes

    International Nuclear Information System (INIS)

    1982-01-01

    This report is intended to serve as a reference document and guide in developing the long-term improvements section of ORNL's radioactive waste management plan. The report reviews ORNL's operations and future program needs in terms of currently applicable DOE regulations and also in terms of regulations and accepted practices of the commerical sector of the nuclear power industry so that the impact of potential future adoption of these regulations and standards on ORNL's operations can be fully evaluated. The principal conclusion reached after reviewing ORNL's waste management operations is that these operations are currently being conducted in a manner that does not endanger the health or safety of workers or the general public and that does not have an adverse effect on the environment. Although nineteen specific problem areas have been identified all of these problems can be attributed to one of the following: a) the legacy of past practices; b) gradual deterioration of systems which have reached (or are near to reaching) the end of their reasonable design lives; and c) potential changes in regulations applicable to ORNL. All of the programs designed to improve or correct these problem areas could be accomplished within a four year period. However, given current limitations on manpower and capital, these programs would more likely be spread out over a five to ten year period of time if they were all to be undertaken. The cost of undertaking all of these projects concurrently is estimated to be between 60 and 100 million dollars. Due to the many unknowns and uncertainties associated with the problem areas, actual total costs for specific projects could vary from those presented in this report by as much as 300 percent

  16. Management Planning In Transport

    Directory of Open Access Journals (Sweden)

    Teodor Perić

    2004-07-01

    Full Text Available Management planning in traffic and other activities includesa choice of missions and goals, as well as actions undertakenfor their realisation. It requires decision-making, that is,a choice among alternative trends of future actions. Therefore,planning and control are closely related.There are several types of plans: purposes or missions,goals, strategies, policies, procedures, rules, programs and calculations.Once managers become aware of the opportunities, they rationallyplan the setting of the goals and assumptions about thecurrent and future environment, finding and evaluating alternativetrends, and selecting the one that is to be followed.Therefore, planning means looking ahead and controlmeans looking backwards. The concept of overall planning,thus including traffic planning, illustrates the approach to managementwhich is based on the achieved goals.

  17. SLC status and SLAC future plans

    International Nuclear Information System (INIS)

    Richter, B.

    1990-01-01

    In this presentation, I shall discuss the linear collider program at the Stanford Linear Accelerator Center as it is now, and as we hope to see it evolve over the next few years. Of greatest interest to the high-energy accelerator physics community gathered here is the development of the linear collider concept, and so I shall concentrate most of this paper on a discussion of the present status and future evolution of the SLC. I will also briefly discuss the research and development program that we are carrying out aimed at the realization of the next generation of higher-energy linear colliders. SLAC has a major colliding-beam storage-ring program as well, including present rings and design studies on future high luminosity projects, but time constraints preclude a discussion of them. (author) 8 figs., 3 tabs

  18. Decommissioning program and future plan for research hot laboratory (2)

    International Nuclear Information System (INIS)

    Koya, Toshio; Nozawa, Yukio; Hanada, Yasushi; Ono, Katsuto; Kanazawa, Hiroyuki; Nihei, Yasuo; Owada, Isao

    2010-01-01

    The Research Hot Laboratory (RHL) in Japan Atomic Energy Agency (JAEA) was constructed in 1961, as the first one in JAPAN, to perform the examinations of irradiated fuels and materials. RHL consists of 10 heavy concrete cells and 38 lead cells, which had been contributed to research and development program in or out of JAEA for the investigation of irradiation behavior for fuels and nuclear materials. However, RHL is the one of target as the rationalization program for decrepit facilities in former Tokai institute. Therefore the decommissioning works of RHL have been started on April 2003. The decommissioning work will be progressing, dismantling the lead cells and decontamination of concrete caves then release in the regulation of controlled area. The 18 lead cells (including semi-hot cell and junior-cell) had been dismantled. Removal of the applause from the cells, survey of the contamination revel in the lead cells and prediction of radio active waste have been finished as the preparing work for dismantling of the remained 20 lead cells. The future plan of decommissioning work has been prepared to incarnate the basic vision and dismantling procedure. (author)

  19. Future plans for HEP computing in the US

    International Nuclear Information System (INIS)

    Ballam, J.

    1985-06-01

    The computing requirements of the US HEP Community are set forth. These will be dominated in the next five years by the pantip (TEV I) and e + e - (SLC and CESR) experiments. The ensuing period will be almost completely driven by the data generated by the superconducting super collider (SSC). Plans for near term computing are presented along with speculations for the SSC. Brief descriptions of accelerator and theoretical physics plans are also presented

  20. Hibernia's environmental planning: Past, present and future

    International Nuclear Information System (INIS)

    Grattan, L.

    1991-01-01

    The Hibernia oil project on the Grand Banks was assessed by the Federal Environmental Assessment and Review (FEARO) process, and the FEARO recommendations were used by the Canada-Newfoundland Offshore Petroleum Board to specify conditions of approval to proceed with the project. The construction site for the Hibernia offshore platform also underwent an environmental evaluation under the FEARO process. The Hibernia project partners are committed to implementing environmental protection plans for all phases of the project, and enforcement of the plans is the responsibility of the two major site contractors. An environmental effects monitoring program is in place at the construction site and the Hibernia partners are consulting closely with fishermen in the site area to develop an operational code of practice and a compensation policy

  1. Assessing future flood hazards for adaptation planning in a northern European coastal community

    Directory of Open Access Journals (Sweden)

    Carlo eSorensen

    2016-05-01

    Full Text Available From a transdisciplinary approach in the town of Thyboron, Denmark, we investigate couplings between sea state (i.e. mean and extreme and flooding hazards today and ahead. This includes analyses of change and variability in the groundwater table, precipitation, land motion, geotechnical ground properties, sewerage systems and other infrastructure to outline a more complete platform for the integration of knowledge into climate adaptation schemes at this highly vulnerable coastal location. It involves the engagement of the main stakeholders who, although having different responsibilities, interests, needs of knowledge and data, and different timeframes for investment and planning, must join in a common appraisal of the challenges faced ahead to provide for better adaptation measures. Apart from obvious adverse effects from future storm surge events, knowledge about the coupled effects of the abovementioned parameters needs to be taken into account to reach optimal mitigation and adaptation measures. Through stakeholder interviews it becomes clear that an enhanced focus on transdisciplinary research is a viable way forward to develop such measures: it will bring in more knowledge, a broader scope, and it will provide for more holistic solutions that both serve to protect the town and allow for business development and better municipal planning ahead.

  2. A challenge in future transportation research and planning: paper presented at the Conference "Energy Technologies for a Sustainable Future", Paul Scherrer Institute, Villigen, 24.11.2000

    OpenAIRE

    Keller, Peter

    2000-01-01

    To understand the future challenge for transportation research and planning, we must make a clear distinction between “mobility” and “transportation”. Mobility is understood to be the ca- pability or possibility of changing position within a specific system (space, society, economy, etc.). On the other hand “transportation” is “spatial mobility”, that is the capability or possibility of changing position within a spatial system (change of location, overcoming of space by peo- ple, goods, ener...

  3. Energy futures, state planning policies and coal mine contests in rural New South Wales

    International Nuclear Information System (INIS)

    Connor, Linda H.

    2016-01-01

    The United Nations 2015 Climate Change Conference established a framework for keeping global temperature increase “well below” two degrees Celsius through commitments by the parties to significant reductions in greenhouse gas emissions. The agreement has implications for the energy policies of all countries, not least major coal exporters like Australia. By contrast, the government's 2015 Energy White Paper lays out the vision for the country's future as a “global energy superpower” dominated by the export of fossil fuels for decades to come. Legislative frameworks around planning, land use, mining, heritage and environment have moved in synchrony with this agenda. Rural landowners in the big coal rich geological basins of Australia are directly impacted by current government policies on energy exports and on domestic supply. This article follows the coal value chain to rural communities in New South Wales where new mines are being built, and analyses the politics of land use, natural resources and energy from the vantage point of landowner engagement with government and corporations in the policy, legislative and regulatory domains. The need for more equitable, democratic and precautionary approaches to energy policy, heritage and environmental planning and agricultural land use is highlighted. - Highlights: • Australian energy policies prioritise coal and gas exports to emerging economies. • Rural landholders are marginalised in mining law, environmental protection legislation and planning regulations. • Disputes with companies centre on control of natural resources necessary for agriculture.

  4. Case mix planning in hospitals: a review and future agenda.

    Science.gov (United States)

    Hof, Sebastian; Fügener, Andreas; Schoenfelder, Jan; Brunner, Jens O

    2017-06-01

    The case mix planning problem deals with choosing the ideal composition and volume of patients in a hospital. With many countries having recently changed to systems where hospitals are reimbursed for patients according to their diagnosis, case mix planning has become an important tool in strategic and tactical hospital planning. Selecting patients in such a payment system can have a significant impact on a hospital's revenue. The contribution of this article is to provide the first literature review focusing on the case mix planning problem. We describe the problem, distinguish it from similar planning problems, and evaluate the existing literature with regard to problem structure and managerial impact. Further, we identify gaps in the literature. We hope to foster research in the field of case mix planning, which only lately has received growing attention despite its fundamental economic impact on hospitals.

  5. To Plan or Not to Plan, That Is the Question

    Science.gov (United States)

    Dolph, David A.

    2016-01-01

    Strategic planning is a process utilized by numerous organizations, including K-12 school boards, intent on improvement and reform. A thoughtful strategic planning process can help develop a board's desired future driven by goals and strategies aimed at progress. However, improvement processes such as strategic planning are challenging. In fact,…

  6. Thoughts on the future. The perspectives of people with early-stage Alzheimer's disease and the implications for advance care planning.

    NARCIS (Netherlands)

    de Boer, M.E.; Dröes, R.M.; Jonker, C.; Eefsting, J.A.; Hertogh, C.M.P.M.

    2012-01-01

    Background: Early diagnosis in dementia is promoted to allow patients to engage in advance care planning (ACP) while still competent to do so and thereby to extend their autonomy into futures in which they lack decision-making capacity. However, engagement of people with dementia in ACP lags behind.

  7. The Radioactive Ion Beams in Brazil (RIBRAS) facility. Description, program, main results, future plans

    Energy Technology Data Exchange (ETDEWEB)

    Lepine-Szily, A.; Lichtenthaeler, R.; Guimaraes, V. [Instituto de Fisica, Universidade de Sao Paulo (Brazil)

    2014-08-15

    RIBRAS (Radioactive Ion Beams in Brazil) is a facility installed at the Institute of Physics of the University of Sao Paulo (IFUSP), Brazil. The RIBRAS system consists of two superconducting solenoids and uses the ''in-flight method'' to produce radioactive ion beams using the primary beam provided by the 8UD Pelletron Tandem of IFUSP. The ion beams produced so far by RIBRAS are {sup 6}He, {sup 8}Li, {sup 7}Be, {sup 10}Be, {sup 8}B, {sup 12}B with intensities that can vary from 10{sup 4} to 10{sup 6} pps. Initially the experimental program covered the study of elastic and inelastic scattering with the objective to study the interaction potential and the reaction mechanisms between weakly bound (RIB) and halo ({sup 6}He and {sup 8}B) projectiles on light, medium and heavy mass targets. With highly purified beams, the study of resonant elastic scattering and resonant transfer reactions, using inverse kinematics and thick targets, has also been included in our experimental program. Also, transfer reactions of astrophysical interest and fusion reactions induced by halo nuclei are part of the near-future research program. Our recent results on elastic scattering, alpha-particle production and total reaction cross sections, as well as the resonant elastic and transfer reactions, are presented. Our plans for the near future are related to the installation of a new beam line and a cave for gamma-ray detection. We intend to place in operation a large area neutron detector available in our laboratory. The long-range plans could be the move of the RIBRAS system to the more energetic beam line of the LINAC post-accelerator (10MeV/nucleon primary beams) still in construction in our laboratory. (orig.)

  8. Doublet III: status and future plans

    International Nuclear Information System (INIS)

    Rawls, J.M.

    1980-04-01

    A synopsis is presented of the experimental results from the ohmic heating phase of Doublet III, with emphasis on the production of good target plasmas for the upcoming neutral beam injection phase. The program plan for the device over the life of the US-Japan cooperative program is discussed, as is the status of the preliminary investigation into replacing the present vacuum vessel by one better suited for ETF simulation

  9. A Vision for the Future: Site-Based Strategic Planning.

    Science.gov (United States)

    Herman, Jerry J.

    1989-01-01

    Presents a model to help principals with strategic planning. Success hinges on involving stakeholders, scanning for relevant data, identifying critical success factors, developing vision and mission statements, analyzing the site manager's supports and constraints, creating strategic goals and objectives, developing action plans, allocating…

  10. Scenario Planning as Organizational Intervention

    DEFF Research Database (Denmark)

    Balarezo, Jose; Nielsen, Bo Bernhard

    2017-01-01

    existing contributions on scenario planning within a new consolidating framework that includes antecedents, processes, and outcomes. The proposed framework allows for integration of the extant literature on scenario planning from a wide variety of fields, including strategic management, finance, human...... resource management, operations management, and psychology. Findings: This study contributes to research by offering a coherent and consistent framework for understanding scenario planning as a dynamic process. As such, it offers future researchers with a systematic way to ascertain where a particular......Purpose: This paper identifies four areas in need of future research to enhance our theoretical understanding of scenario planning, and sets the basis for future empirical examination of its effects on individual and organizational level outcomes. Design/methodology/approach: This paper organizes...

  11. Theory and Praxis in Community Based Language Development: preliminary findings from applications of the Guide for Planning the Future of Our Language

    OpenAIRE

    Eberhard David M.

    2017-01-01

    This study will provide a critique of preliminary results obtained from the application of the ‘Guide for Planning the Future of Our Language’ (Hanawalt, Varenkamp, Lahn, & Eberhard 2015) in minority speech communities. This recent methodological tool was developed to enable and empower minoritized language groups to do their own language planning and to control their own language development. The tool is based on a theoretical approach to community based language development known as the ‘Su...

  12. The operation of accelerators as entrusted business and our company's future plans concerning this tie-up

    International Nuclear Information System (INIS)

    Satoh, Y.; Tanaka, M.

    2004-01-01

    Research Institutes have entrusted the operation of large-scale accelerators to private enterprise in Japan. Research Institutes expect private enterprise to operate and maintain accelerators in a stable condition. With the use of highly advanced accelerators and the diversification of the research to which they are applied, operators of accelerators have come to be considered as supporters of research and are expected to understand the associated highly advanced technologies. In this paper, we are going to consider the present operation of accelerators and discuss our company's future plans concerning this business tie-up. (author)

  13. Clermont Preferred Future: Stakeholder Reflections on a Community Foresight and Planning Initiative

    Directory of Open Access Journals (Sweden)

    Richard Parsons

    2013-10-01

    Full Text Available This paper demonstrates the potential of the mining industry to contribute to social development (community building, resilience and wellbeing and to economic transitioning post-mining. A number of factors may facilitate the realisation of this potential, in particular community engagement activities that build community resilience and capacity to adapt to changing environments. This paper reviews a community foresight initiative, named Clermont Preferred Future (CPF, which is associated with a coal mine development in the town of Clermont in Queensland, Australia. The purpose of CPF, which was adopted in 2008 and is intended to continue to 2020, is to facilitate a transition to a prosperous and sustainable future by leveraging opportunities from coal mining while reducing dependence on the industry. CPF has been cited as a successful model of engagement and community development, and was highly commended in the Community Economic Development category at the 2011 Australian National Awards for Economic Development Excellence. This review draws on the experiences of stakeholders involved in CPF, and on foresight, community engagement, and community development literature. It identifies what has worked well, what has fallen short of the project’s rhetorical aspirations, and how processes and outcomes might be improved. It also trials artwork as an engagement tool. The findings are valuable for Clermont specifically, but also for the mining industry and mining communities more broadly, as well as for other industries in the context of community engagement and strategic planning.

  14. Planning for the Future of Geo-Cybereducation: Outcomes of the Workshop, Challenges, and Future Directions

    Science.gov (United States)

    Ryan, J. G.; Eriksson, S. C.

    2010-12-01

    Inspired by the recommendations of the NSF report “Fostering Learning in the Networked World: The Cyberlearning Opportunity and Challenge” (NSF08204), the NSF National STEM Digital Learning program funded “Planning for the Future of Geocybereducation” Workshop sought to bring together leaders from the geoscience education community, from major geoscience research initiatives, and from the growing public- and private-sector geoscience information community. The objectives of the workshop were to begin conversations aimed at identifying best practices and tools for geoscience cyber-education, in the context of both the changing nature of learners and of rapidly evolving geo-information platforms, and to provide guidance to the NSF as to necessary future directions and needs for funding. 65 participants met and interacted live for the two-day workshop, with ongoing post-meeting virtual interactions via a collaborative workspace (www.geocybered.ning.com). Topics addressed included the rapidly changing character of learners, the growing capabilities of geoscience information systems and their affiliated tools, and effective models for collaboration among educators, researchers and geoinformation specialists. Discussions at the meeting focused on the implications of changing learners on the educational process, the challenges for teachers and administrators in keeping pace, and on the challenges of communication among these divergent professional communities. Ongoing virtual discussions and collaborations have produced a draft workshop document, and the workshop conveners are maintaining the workshop site as a venue for ongoing discussion and interaction. Several key challenges were evident from the workshop discussions and subsequent interactions: a) the development of most of the large geoinformatics and geoscience research efforts were not pursued with education as a significant objective, resulting in limited financial support for such activities after the

  15. Artificial Intelligence Research Branch future plans

    Science.gov (United States)

    Stewart, Helen (Editor)

    1992-01-01

    This report contains information on the activities of the Artificial Intelligence Research Branch (FIA) at NASA Ames Research Center (ARC) in 1992, as well as planned work in 1993. These activities span a range from basic scientific research through engineering development to fielded NASA applications, particularly those applications that are enabled by basic research carried out in FIA. Work is conducted in-house and through collaborative partners in academia and industry. All of our work has research themes with a dual commitment to technical excellence and applicability to NASA short, medium, and long-term problems. FIA acts as the Agency's lead organization for research aspects of artificial intelligence, working closely with a second research laboratory at the Jet Propulsion Laboratory (JPL) and AI applications groups throughout all NASA centers. This report is organized along three major research themes: (1) Planning and Scheduling: deciding on a sequence of actions to achieve a set of complex goals and determining when to execute those actions and how to allocate resources to carry them out; (2) Machine Learning: techniques for forming theories about natural and man-made phenomena; and for improving the problem-solving performance of computational systems over time; and (3) Research on the acquisition, representation, and utilization of knowledge in support of diagnosis design of engineered systems and analysis of actual systems.

  16. The Majorana Demonstrator for 0νββ: Current Status and Future Plans

    Energy Technology Data Exchange (ETDEWEB)

    Green, Matthew P. [ORNL; Avignone, F. T. [University of South Carolina/Oak Ridge National Laboratory (ORNL); Bertrand, Jr, Fred E [ORNL; Galindo-Uribarri, Alfredo [ORNL; Radford, David C [ORNL; Romero-Romero, Elisa [ORNL; Varner, Jr, Robert L [ORNL; White, Brandon R [ORNL; Wilkerson, J. F. [UNC/Triangle Univ. Nucl. Lab, Durham, NC/ORNL; Yu, Chang-Hong [ORNL

    2015-01-01

    The Majorana Demonstrator will search for neutrinoless-double-beta decay (0νββ) in 76Ge, while establishing the feasibility of a future tonne-scale germanium-based 0νββ experiment, and performing searches for new physics beyond the Standard Model. The experiment, currently under construction at the Sanford Underground Research Facility in Lead, SD, will consist of a pair of modular high-purity germanium detector arrays housed inside of a compact copper, lead, and polyethylene shield. Through a combination of strict materials qualifications and assay, low-background design, and powerful background rejection techniques, the Demonstrator aims to achieve a background rate in the 0νββ region of interest (ROI) of no more than 3cnts/(ROI-t-y). The current status of the Demonstrator is discussed, as are plans for its completion.

  17. Future plans at ISOLDE

    CERN Document Server

    Lindroos, M

    2003-01-01

    The CERN ISOLDE facility has operated for over 30 years delivering beams of exotic ions to an ever-growing user community. The facility went through a major up-grade in the early 1990s with the move from the 600 MeV synchrocyclotron to the 1 GeV PS-Booster proton synchrotron. This was followed by a primary proton beam energy up grade to 1.4 GeV in 1999. Lately, an important step forward was taken with the start of the REX-ISOLDE experiment for charge breeding and post acceleration of exotic ions. CERN has recently decided on a consolidation project for the facility to assure that the required number of shifts can be delivered in the future. An overview will be given of the on-going consolidation and development programme and its implications on the physics programme, in particular the REX-ISOLDE post accelerator experiment. An important parameter for a better yield of very exotic elements is the primary proton beam intensity, beam energy and time structure. The possible short-term improvements of, in particul...

  18. Nuclear disasters: current plans and future directions for oncologists.

    Science.gov (United States)

    Goffman, Thomas E

    2008-01-01

    To show that there is a significant role for oncologists in the event of a terrorist nuclear disaster. Professionals need data on current political issues regarding a nuclear attack already put in place by the administration and the military. Review of what actually occurs during a fission bomb's explosion helps to point out what medical care will be most needed. The author contends that those trained in the oncologies could play a major part. Modern-day America. Potential civilian survivors. Large gaps noted in statewide disaster plans in the public domain. Oncologists must get involved now in disaster planning; statewide plans are necessary throughout the nation; the public needs to know the basics of what to do in the advent of a nuclear bomb explosion.

  19. Person-Centered Transition Planning.

    Science.gov (United States)

    Miner, Craig A.; Bates, Paul E.

    1997-01-01

    Describes a person-centered planning approach for involving students with disabilities and their families in the transition planning process. Components of person-centered planning are discussed, including development of a personal profile, identification of future lifestyle preferences, action steps and responsible parties, and necessary changes…

  20. Safeguards Technology Strategic Planning Pentachart

    International Nuclear Information System (INIS)

    Carroll, C. J.

    2017-01-01

    Builds on earlier strategic planning workshops conducted for SGIT, SGTS, and SGCP. Many of recommendations from these workshops have been successfully implemented at the IAEA. Provide a context for evaluating new approaches for anticipated safeguards challenges of the future. Approach used by government and military to plan for an uncertain future. Uses consensus decision-making.

  1. Strategic planning: today's hot buttons.

    Science.gov (United States)

    Bohlmann, R C

    1998-01-01

    The first generation of mergers and managed care hasn't slowed down group practices' need for strategic planning. Even groups that already went through one merger are asking about new mergers or ownership possibilities, the future of managed care, performance standards and physician unhappiness. Strategic planning, including consideration of bench-marking, production of ancillary services and physician involvement, can help. Even if only a short, general look at the future, strategic planning shows the proactive leadership needed in today's environment.

  2. Nurse manager succession planning: a concept analysis.

    Science.gov (United States)

    Titzer, Jennifer L; Shirey, Maria R

    2013-01-01

    The current nursing leadership pipeline is inadequate and demands strategic succession planning methods. This article provides concept clarification regarding nurse manager succession planning. Attributes common to succession planning include organizational commitment and resource allocation, proactive and visionary leadership approach, and a mentoring and coaching environment. Strategic planning, current and future leadership analysis, high-potential identification, and leadership development are succession planning antecedents. Consequences of succession planning are improved leadership and organizational culture continuity, and increased leadership bench strength. Health care has failed to strategically plan for future leadership. Developing a strong nursing leadership pipeline requires deliberate and strategic succession planning. © 2013 Wiley Periodicals, Inc.

  3. Can Strategic Spatial Planning Contribute to Land Degradation Reduction in Urban Regions? State of the Art and Future Research

    Directory of Open Access Journals (Sweden)

    Eduardo Oliveira

    2018-03-01

    Full Text Available Land degradation is becoming a serious environmental issue threatening fertile agricultural soils and other natural resources. There are many driving forces behind land degradation. The expansion of artificial surfaces due to various economic activities, such as housing, industry, and transport infrastructure, known as soil sealing, constitutes one of the most intensive forms of land degradation in urban regions. Measures to halt and reverse land degradation require both strong land-use management policies, as well as effective spatial planning mechanisms. In this regard, strategic spatial planning has been increasingly practised in many urban regions worldwide, as a means to achieve sustainable land-use patterns and to guide the location of development and physical infrastructures. It is reasonable, therefore, to expect that strategic spatial planning can counteract the outlined undesired land degradation effects, specifically those resulting from soil sealing. In this paper, we review strategic spatial planning literature published between 1992 and 2017. The focus is on the phenomena causing land degradation that are addressed by strategic spatial planning literature, as well as on the mechanisms describing the role of strategic spatial planning in land degradation reduction. Results show that sustainable development and environmental concerns have become core objectives of strategic planning in recent years, yet references to the drivers of land degradation are rare. The mechanisms that exist are mainly intended to address environmental issues in general, and are not aimed at reducing particular forms of land degradation. The paper concludes by sketching future research directions, intended to support strategic spatial planning and land-use policymaking related to coping with the global phenomenon of land degradation.

  4. Sulfur dioxide control in China: policy evolution during the 10th and 11th Five-year Plans and lessons for the future

    International Nuclear Information System (INIS)

    Schreifels, Jeremy J.; Fu, Yale; Wilson, Elizabeth J.

    2012-01-01

    China's Central government established national goals to reduce sulfur dioxide (SO 2 ) emissions by 10% in both the 10th and 11th Five-year Plan periods, 2001–2005 and 2006–2010, respectively. But the early policies were unsuccessful at reducing emissions—emissions increased 28% during the 10th Five-year Plan. After adapting a number of policies and introducing new instruments during the 11th Five-year Plan, SO 2 emissions declined by 14%. We examine the evolution of these policies, their interplay with technical and institutional factors, and capture lessons from the 11th Five-year Plan to guide future pollution control programs. We find that several factors contributed to achievement of the 11th Five-year Plan SO 2 reduction goal: (1) instrument choice, (2) political accountability, (3) emission verification, (4) political support, (5) streamlined targets, and (6) political and financial incentives. The approach integrated multiple policy instruments—market-based, command-and-control, and administrative instruments specific to the Chinese context. The evolution of SO 2 reduction policies and programs has implications for further SO 2 reductions from power plants and other sources, as well as control of other atmospheric pollutants such as nitrogen oxides (NO X ) and carbon dioxide (CO 2 ) in China. - Highlights: ► This paper assesses China's SO 2 reduction policies between 2000 and 2010. ► Government used a variety of policy instruments to achieve emission targets. ► Experience shows that accountability, incentives, and political support were key. ► The policy lessons can aid future policies for SO 2 , NO x , and CO 2 reductions.

  5. The Australian Geodetic Observing Program. Current Status and Future Plans

    Science.gov (United States)

    Johnston, G.; Dawson, J. H.

    2015-12-01

    Over the last decade, the Australian government has through programs like AuScope, the Asia Pacific Reference Frame (APREF), and the Pacific Sea Level Monitoring (PSLM) Project made a significant contribution to the Global Geodetic Observing Program. In addition to supporting the national research priorities, this contribution is justified by Australia's growing economic dependence on precise positioning to underpin efficient transportation, geospatial data management, and industrial automation (e.g., robotic mining and precision agriculture) and the consequent need for the government to guarantee provision of precise positioning products to the Australian community. It is also well recognised within Australia that there is an opportunity to exploit our near unique position as being one of the few regions in the world to see all new and emerging satellite navigation systems including Galileo (Europe), GPS III (USA), GLONASS (Russia), Beidou (China), QZSS (Japan) and IRNSS (India). It is in this context that the Australian geodetic program will build on earlier efforts and further develop its key geodetic capabilities. This will include the creation of an independent GNSS analysis capability that will enable Australia to contribute to the International GNSS Service (IGS) and an upgrade of key geodetic infrastructure including the national VLBI and GNSS arrays. This presentation will overview the significant geodetic activities undertaken by the Australian government and highlight its future plans.

  6. Innovation and future in Westinghouse

    International Nuclear Information System (INIS)

    Congedo, T.; Dulloo, A.; Goosen, J.; Llovet, R.

    2007-01-01

    For the past six years, Westinghouse has used a Road Map process to direct technology development in a way that integrates the efforts of our businesses to addresses the needs of our customers and respond to significant drivers in the evolving business environment. As the nuclear industry experiences a resurgence, it is ever more necessary that we increase our planning horizon to 10-15 years in the future so as to meet the expectations of our customers. In the Future Point process, driven by the methods of Design for Six Sigma (DFSS), Westinghouse considers multiple possible future scenarios to plan long term evolutionary and revolutionary development that can reliably create the major products and services of the future market. the products and services of the future stretch the imagination from what we provide today. However, the journey to these stretch targets prompts key development milestones that will help deliver ideas useful for nearer term products. (Author) 1 refs

  7. FAA Flight Plan 2009-2013

    Science.gov (United States)

    2009-01-01

    The Flight Plan is the strategic plan for the agency, the plan to help us prepare for the future. The majority of FAAs responsibilities are our core functionsour everyday roles and responsibilitieswhich are not specifically highlighted in th...

  8. Role of nuclear safety research and future plan

    International Nuclear Information System (INIS)

    Kim, W. S.; Lee, J. I.; Kang, S. C.; Park, Y. W.; Lee, J. H.; Kim, M. W.; Lee, C. J.; Park, Y. I.

    2000-01-01

    For promoting and improving nuclear safety research activities, this report gives an insight on the scope of safety research and its role in the safety management of nuclear installations, and suggests measures to adequately utilize the research results through taking an optimized role share among research organizations. Several measures such as cooperative planning of common research areas and proper role assignment, improvement of the interfaces among researchers, and reflection of end-users' opinion in the course of planning and conducting research to promote application of research results are identified. It is expected that the identified measures will contribute to enhancing the efficiency and effectiveness of nuclear safety research, if they are implemented after deliberating with the government and safety research organizations

  9. Localization experience and future plan of NSLS primary components

    International Nuclear Information System (INIS)

    Kim, Haesoo

    1992-01-01

    Korea Heavy Industries and Construction Company is planning to obtain technical self-reliance of the component design, manufacturing and installation of the NSLS primary components as much as the target of 87% by 1995 as indicated in the technical self-reliance plan by the Korea Electric Power Company in 1988. In order to achieve this target, Koch has been involved in the component design, manufacturing and project management of the NSLS components from the early stage of the Young 3 and 4 project. In parallel, Koch has increased the self-reliance of the various fields taking full advantage of the technical documents, computer codes, training and consultation supplied by the technology transfer agreement. This paper presents the re-evaluation of the current status of technical self reliance as well as the make up plan to be implemented during the UCH 3 and 4 project for the area identified as the weakness

  10. Low Impact Development Master Plan

    Energy Technology Data Exchange (ETDEWEB)

    Loftin, Samuel R. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-10-02

    This project creates a Low Impact Development (LID) Master Plan to guide and prioritize future development of LID projects at Los Alamos National Laboratory (LANL or the Laboratory). The LID Master Plan applies to developed areas across the Laboratory and focuses on identifying opportunities for storm water quality and hydrological improvements in the heavily urbanized areas of Technical Areas 03, 35 and 53. The LID Master Plan is organized to allow the addition of LID projects for other technical areas as time and funds allow in the future.

  11. Planning Systems for Distributed Operations

    Science.gov (United States)

    Maxwell, Theresa G.

    2002-01-01

    This viewgraph representation presents an overview of the mission planning process involving distributed operations (such as the International Space Station (ISS)) and the computer hardware and software systems needed to support such an effort. Topics considered include: evolution of distributed planning systems, ISS distributed planning, the Payload Planning System (PPS), future developments in distributed planning systems, Request Oriented Scheduling Engine (ROSE) and Next Generation distributed planning systems.

  12. Future perspectives

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    International involvement in particle physics is what the International Committee for Future Accelerators (ICFA) is all about. At the latest Future Perspectives meeting at Brookhaven from 5-10 October (after a keynote speech by doyen Viktor Weisskopf, who regretted the emergence of 'a nationalistic trend'), ICFA reviewed progress and examined its commitments in the light of the evolving world particle physics scene. Particular aims were to review worldwide accelerator achievements and plans, to survey the work of the four panels, and to discuss ICFA's special role in future cooperation in accelerator construction and use, and in research and development work for both accelerators and for detectors

  13. [Considering housing arrangements in elderly life: factors influencing plans concerning future housing arrangements and preferences in a representative sample of 45+ year olds].

    Science.gov (United States)

    Spangenberg, L; Glaesmer, H; Brähler, E; Kersting, A; Strauß, B

    2013-04-01

    Providing care and support for the elderly is a future challenge. Using regression analysis, a representative population-based sample (n = 1,445) was examined with respect to whether they had considered future housing and which variables influenced their thoughts and preferences. The majority of the sample reported thinking about housing in old age and preferred to stay at home in old age. Thoughts about future housing and housing preferences were predicted by different factors in the age groups analyzed. Thinking about future housing was positively associated with increasing age and depression. Other relevant predictors were gender, living with a partner, images of old age (especially negative ones), and anticipated subjective health. These variables also predicted housing preferences. Thoughts about future living arrangements are widespread, and their importance increases with age. The wishes reported do contrast to a certain extent with reality. Planning future care as well as developing consultation guidelines should address these issues while considering the reported influences.

  14. The MAJORANA DEMONSTRATOR for 0νββ: Current Status and Future Plans

    Science.gov (United States)

    Green, M. P.; Abgrall, N.; Aguayo, E.; Avignone, F. T.; Barabash, A. S.; Bertrand, F. E.; Boswell, M.; Brudanin, V.; Busch, M.; Byram, D.; Caldwell, A. S.; Chan, Y.-D.; Christofferson, C. D.; Combs, D. C.; Cuesta, C.; Detwiler, J. A.; Doe, P. J.; Efremenko, Yu.; Egorov, V.; Ejiri, H.; Elliott, S. R.; Fast, J. E.; Finnerty, P.; Fraenkle, F. M.; Galindo-Uribarri, A.; Giovanetti, G. K.; Goett, J.; Gruszko, J.; Guiseppe, V. E.; Gusev, K.; Hallin, A. L.; Hazama, R.; Hegai, A.; Henning, R.; Hoppe, E. W.; Howard, S.; Howe, M. A.; Keeter, K. J.; Kidd, M. F.; Kochetov, O.; Konovalov, S. I.; Kouzes, R. T.; LaFerriere, B. D.; Leon, J.; Leviner, L. E.; Loach, J. C.; MacMullin, J.; MacMullin, S.; Martin, R. D.; Meijer, S.; Mertens, S.; Nomachi, M.; Orrell, J. L.; O'Shaughnessy, C.; Overman, N. R.; Phillips, D. G.; Poon, A. W. P.; Pushkin, K.; Radford, D. C.; Rager, J.; Rielage, K.; Robertson, R. G. H.; Romero-Romero, E.; Ronquest, M. C.; Schubert, A. G.; Shanks, B.; Shima, T.; Shirchenko, M.; Snavely, K. J.; Snyder, N.; Suriano, A. M.; Thompson, J.; Timkin, V.; Tornow, W.; Trimble, J. E.; Varner, R. L.; Vasilyev, S.; Vetter, K.; Vorren, K.; White, B. R.; Wilkerson, J. F.; Wiseman, C.; Xu, W.; Yakushev, E.; Young, A. R.; Yu, C.-H.; Yumatov, V.

    The MAJORANA DEMONSTRATOR will search for neutrinoless-double-beta decay (0νββ) in 76Ge, while establishing the feasibility of a future tonne-scale germanium-based 0νββ experiment, and performing searches for new physics beyond the Standard Model. The experiment, currently under construction at the Sanford Underground Research Facility in Lead, SD, will consist of a pair of modular high-purity germanium detector arrays housed inside of a compact copper, lead, and polyethylene shield. Through a combination of strict materials qualifications and assay, low-background design, and powerful background rejection techniques, the Demonstrator aims to achieve a background rate in the 0νββ region of interest (ROI) of no more than 3 counts in the 0νββ-decay ROI per tonne of target isotope per year (cnts/(ROI-t-y)). The current status of the Demonstrator is discussed, as are plans for its completion.

  15. Current situation and future plans in radioactive waste management in Mexico

    International Nuclear Information System (INIS)

    Lopez, H.; Jimenez, M.

    1992-01-01

    A brief introduction is offered in this document in order to explain the importance which is given in Mexico to the safe management of radioactive wastes. The Secretaria de Energia, Minas e Industria Paraestatal is the organization responsible for this issue. Also, a brief historical background is offered so as to understand the evolution of these activities since they were originated. This background allows us to describe the present situation, which consists in a substantial change in the volume of produced radioactive wastes; in other words, before the present situation only the, nuclear wastes from the application of radioisotopes were generated whereas currently, with the starting of commercial operation of the first unit of Laguna Verde Nuclear Power Plant (LVNPP), large volumes of industrial radioactive wastes are being generated. A mention is given as well of the acquired experience during more than 20 years of waste management and of the technologies which have been applied or practiced in the use and disposal of such wastes. Finally, some general trends in relation to the future planning are indicated, which essentially consist in the siting and characterization of a site so as to, design and construct a permanent disposal facility in order to dispose the operational radioactive wastes from LVNPP

  16. Midwest regional management plan

    International Nuclear Information System (INIS)

    Paton, R.F.

    1986-01-01

    In response to the Low-Level Radioactive Waste Policy Act of 1980, the States of Indiana, Iowa, Michigan, Minnesota, Missouri, Ohio and Wisconsin formed the Midwest Interstate Low-Level Radioactive Waste Compact. One of the top priorities of the Compact Commission is the development of a comprehensive regional waste management plan. The plan consists of five major elements: (1) waste inventory; (2) waste stream projections; (3) analysis of waste management and disposal options; (4) development of a regional waste management system; and (5) selection of a host state(s) for future low-level waste facilities. When completed, the Midwest Management Plan will serve as the framework for future low-level radioactive waste management and disposal decisions

  17. FutureCoast: "Listen to your futures"

    Science.gov (United States)

    Pfirman, S. L.; Eklund, K.; Thacher, S.; Orlove, B. S.; Diane Stovall-Soto, G.; Brunacini, J.; Hernandez, T.

    2014-12-01

    Two science-arts approaches are emerging as effective means to convey "futurethinking" to learners: systems gaming and experiential futures. FutureCoast exemplifies the latter: by engaging participants with voicemails supposedly leaking from the cloud of possible futures, the storymaking game frames the complexities of climate science in relatable contexts. Because participants make the voicemails themselves, FutureCoast opens up creative ways for people to think about possibly climate-changed futures and personal ways to talk about them. FutureCoast is a project of the PoLAR Partnership with a target audience of informal adult learners primarily reached via mobile devices and online platforms. Scientists increasingly use scenarios and storylines as ways to explore the implications of environmental change and societal choices. Stories help people make connections across experiences and disciplines and link large-scale events to personal consequences. By making the future seem real today, FutureCoast's framework helps people visualize and plan for future climate changes. The voicemails contributed to FutureCoast are spread through the game's intended timeframe (2020 through 2065). Based on initial content analysis of voicemail text, common themes include ecosystems and landscapes, weather, technology, societal issues, governance and policy. Other issues somewhat less frequently discussed include security, food, industry and business, health, energy, infrastructure, water, economy, and migration. Further voicemail analysis is examining: temporal dimensions (salient time frames, short vs. long term issues, intergenerational, etc.), content (adaptation vs. mitigation, challenges vs. opportunities, etc.), and emotion (hopeful, resigned, etc. and overall emotional context). FutureCoast also engaged audiences through facilitated in-person experiences, geocaching events, and social media (Tumblr, Twitter, Facebook, YouTube). Analysis of the project suggests story

  18. Evidence for Future Cognition in Animals

    Science.gov (United States)

    Roberts, William A.

    2012-01-01

    Evidence concerning the possibility of mental time travel into the future by animals was reviewed. Both experimental laboratory studies and field observations were considered. Paradigms for the study of future anticipation and planning included inhibition of consumption of current food contingent on future receipt of either a larger quantity or…

  19. Developing nursing care plans.

    Science.gov (United States)

    Ballantyne, Helen

    2016-02-24

    This article aims to enhance nurses' understanding of nursing care plans, reflecting on the past, present and future use of care planning. This involves consideration of the central theories of nursing and discussion of nursing models and the nursing process. An explanation is provided of how theories of nursing may be applied to care planning, in combination with clinical assessment tools, to ensure that care plans are context specific and patient centred.

  20. Evaluation of the current landscape of respiratory nurse specialists in the UK: planning for the future needs of patients.

    Science.gov (United States)

    Yorke, Janelle; Prigmore, Sam; Hodson, Matt; Stonham, Carol; Long, Hannah; Bellhouse, Sarah; Fletcher, Monica; Edwards, Sheila

    2017-01-01

    The National Health Service currently faces significant challenges and must optimise effective workforce planning and management. There are increasing concerns regarding poor workforce planning for respiratory medicine; a greater understanding of the role of respiratory nurse specialists will inform better workforce planning and management. This was a survey study. Two surveys were administered: an organisational-level survey and an individual respiratory nurse survey. There were 148 and 457 respondents to the organisational and individual nurse survey, respectively. Four main themes are presented: (1) breadth of service provided; (2) patient care; (3) work environment; and (4) succession planning. The majority of work conducted by respiratory nurse specialists relates to patient care outside the secondary care setting including supporting self-management in the home, supporting patients on home oxygen, providing hospital-at-home services and facilitating early discharge from acute care environments. Yet, most respiratory nursing teams are employed by secondary care trusts and located within acute environments. There was evidence of multidisciplinary working, although integrated care was not prominent in the free-text responses. High workload was reported with one-quarter of nursing teams short-staffed. Respiratory nurses reported working unpaid extra hours and a lack of administrative support that often took them away from providing direct patient care. Nearly half of the present sample either plan to retire or are eligible for retirement within 10 years. This survey report provides a current snapshot of the respiratory nurse specialist workforce in the UK. This workforce is an ageing population; the results from this survey can be used to inform succession planning and to ensure a viable respiratory nurse specialist workforce in future.

  1. Environmental Scanning, Futures Research, Strategic Foresight and Organizational Future Orientation

    DEFF Research Database (Denmark)

    Rohrbeck, René; Bade, Manuel

    to adjacent research disciplines. Through such integration and linkage research should produce better recommendations for managers on how to build an organizational future orientation, drive organizational adaptation, and make their firms robust towards external discontinuous change.......In this paper we explore the current understanding on how firms explore future changes and trends as well as plan their managerial responses. We review literature in four research streams: (1) environmental scanning, (2) futures research, (3) peripheral vision, and (4) corporate/strategic foresight....... Through the analysis of more than 250 articles we (a) trace the evolution over time, (b) highlight the linkages between the different research streams, and (c) give recommendations for future research. Overall we call for more cross-fertilization of the different research streams and a stronger linkage...

  2. Modeling the impact of future development and public conservation orientation on landscape connectivity for conservation planning

    DEFF Research Database (Denmark)

    Lechner, Alex Mark; Brown, Greg; Raymond, Christopher Mark

    2015-01-01

    aspects of conservation planning. Objectives We present an approach for characterizing the potential effects of public conservation orientation and projected future development land use scenarios on landscape connectivity. Methods Using public participation GIS techniques (mail-based surveys linked...... to a mapping component), we classified spatially explicit conservation values and preferences into a conservation orientation index consisting of positive, negative, or neutral scores. Connectivity was then modeled using a least-cost path and graph-network approach for a range of conservation orientation...... and development scenarios in the Lower Hunter region, Australia. Scenarios were modelled through either adding vegetation (positive orientation) or removing vegetation (negative orientation, development). Results Scenarios that included positive conservation orientation link the isolated eastern and western...

  3. Program planning for future improvement in managing ORNL's radioactive wastes

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    This report is intended to serve as a reference document and guide in developing the long-term improvements section of ORNL's radioactive waste management plan. The report reviews ORNL's operations and future program needs in terms of currently applicable DOE regulations and also in terms of regulations and accepted practices of the commerical sector of the nuclear power industry so that the impact of potential future adoption of these regulations and standards on ORNL's operations can be fully evaluated. The principal conclusion reached after reviewing ORNL's waste management operations is that these operations are currently being conducted in a manner that does not endanger the health or safety of workers or the general public and that does not have an adverse effect on the environment. Although nineteen specific problem areas have been identified all of these problems can be attributed to one of the following: a) the legacy of past practices; b) gradual deterioration of systems which have reached (or are near to reaching) the end of their reasonable design lives; and c) potential changes in regulations applicable to ORNL. All of the programs designed to improve or correct these problem areas could be accomplished within a four year period. However, given current limitations on manpower and capital, these programs would more likely be spread out over a five to ten year period of time if they were all to be undertaken. The cost of undertaking all of these projects concurrently is estimated to be between 60 and 100 million dollars. Due to the many unknowns and uncertainties associated with the problem areas, actual total costs for specific projects could vary from those presented in this report by as much as 300 percent. (DMC)

  4. NASA Life Sciences Data Repositories: Tools for Retrospective Analysis and Future Planning

    Science.gov (United States)

    Thomas, D.; Wear, M.; VanBaalen, M.; Lee, L.; Fitts, M.

    2011-01-01

    As NASA transitions from the Space Shuttle era into the next phase of space exploration, the need to ensure the capture, analysis, and application of its research and medical data is of greater urgency than at any other previous time. In this era of limited resources and challenging schedules, the Human Research Program (HRP) based at NASA s Johnson Space Center (JSC) recognizes the need to extract the greatest possible amount of information from the data already captured, as well as focus current and future research funding on addressing the HRP goal to provide human health and performance countermeasures, knowledge, technologies, and tools to enable safe, reliable, and productive human space exploration. To this end, the Science Management Office and the Medical Informatics and Health Care Systems Branch within the HRP and the Space Medicine Division have been working to make both research data and clinical data more accessible to the user community. The Life Sciences Data Archive (LSDA), the research repository housing data and information regarding the physiologic effects of microgravity, and the Lifetime Surveillance of Astronaut Health (LSAH-R), the clinical repository housing astronaut data, have joined forces to achieve this goal. The task of both repositories is to acquire, preserve, and distribute data and information both within the NASA community and to the science community at large. This is accomplished via the LSDA s public website (http://lsda.jsc.nasa.gov), which allows access to experiment descriptions including hardware, datasets, key personnel, mission descriptions and a mechanism for researchers to request additional data, research and clinical, that is not accessible from the public website. This will result in making the work of NASA and its partners available to the wider sciences community, both domestic and international. The desired outcome is the use of these data for knowledge discovery, retrospective analysis, and planning of future

  5. Social Media Technology and Public Health in Ontario: Findings from a Planning Meeting Exploring Current Practices and Future Research Directions.

    Science.gov (United States)

    Booth, Richard; McMurray, Josephine; Regan, Sandra; Kothari, Anita; Donelle, Lorie; McBride, Susan; Sobel, Annette; Hall, Jodi; Fraser, Robert; Foisey, Lyndsay

    2017-01-01

    In the province of Ontario, many of the public health units (PHUs) now possess and use social media as part of their daily health promotion and communication operations. To explore this topic, a planning meeting was held to generate deeper insights toward the use of these forms of technology for preventative services delivery. The planning meeting was held with 50 participants, comprising representatives from 20 of the 36 PHUs in Ontario, interested academics, students and government representatives. A nominal group technique (NGT) was used to build consensus related to future research needs, as related to public health and social media. Participants generated a range of insights around the use of social media, including the need for: leadership buy-in and resource allocation; social media policy and governance structure; performance measurement and evaluation; practices related to engagement with program recipients and addressing the lack of resources faced by many health units. Future research priorities were also generated, related to evaluating the cost-benefit of social media activities and understanding behaviour change implications. Further research is needed to evaluate the functionality, leadership and competency requirements and impact(s) of these new forms of health communication technology within public health service delivery. Copyright © 2017 Longwoods Publishing.

  6. Ontario's long-term energy plan, building our clean energy future

    International Nuclear Information System (INIS)

    2010-01-01

    The first energy priority of the plan is to provide all Ontarians with a clean, modern and reliable electricity system. It gives a summary of the means implemented to help families and businesses with increasing electricity costs. The plan is to shift the province from a coal-dependent system. Over the next 20 years, 15,000 MW (megawatt) of generating capacity will have to be rebuilt or constructed to replace older Ontario's energy infrastructures. In Ontario, an increase of about 3.5% per year in residential prices, resulting from the need to enjoy clean air, reliable generation and modernized transmission, is expected to occur over the next two decades. The expected electricity needs in Ontario and efficient means to satisfy them are described in this plan.

  7. ATLAS Future Plans: Upgrade and the Physics with High Luminosity

    Directory of Open Access Journals (Sweden)

    Rajagopalan S.

    2013-05-01

    Full Text Available The ATLAS experiment is planning a series of detector upgrades to cope with the planned increases in instantaneous luminosity and multiple interactions per crossing to maintain its physics capabilities. During the coming decade, the Large Hadron Collider will collide protons on protons at a center of mass energy up to 14 TeV with luminosities steadily increasing in a phased approach to over 5 × 1034 cm−2s−1. The resulting large data sets will significantly enhance the physics reach of the ATLAS detector building on the recent discovery of the Higgs-like boson. The planned detector upgrades being designed to cope with the increasing luminosity and its impact on the ATLAS physics program will be discussed.

  8. Comprehensive facilities plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitate existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.

  9. Scenario planning for the electricity generation in Indonesia

    International Nuclear Information System (INIS)

    Rachmatullah, C.; Aye, L.; Fuller, R.J.

    2007-01-01

    The long-term planning of a future electricity supply system requires data about future demand. Planners who use the conventional planning method forecast future demand by observing past trends or alternatively by developing scenarios and then selecting the scenarios considered to be the most likely to occur. This method, however, fails to include future uncertainties. To consider such uncertainties, the scenario planning method may be used. This study uses this method to devise a long-term electricity supply plan for the Java-Madura-Bali electricity system. It was found that the scenario planning method could save up to US$3.5 billion over a 15-year period of the method was applied right at the beginning of the period. In the case of the Java-Madura-Bali system, which currently has excess installed capacity, the scenario planning method does not provide such large benefits. It was also found that introducing integrated coal gasification combined cycle and advanced gas combined cycle units would reduce greenhouse gas emissions from the Java-Madura-Bali system by approximately 230 million tonnes or 15% compared to a business-as-usual (BAU) scenario over a 15-year planning timeframe. The abatement cost was found to be US$4 per tonne of CO 2 . (author)

  10. Scenario planning for the electricity generation in Indonesia

    Energy Technology Data Exchange (ETDEWEB)

    Rachmatullah, C.; Aye, L.; Fuller, R.J. [The University of Melbourne, Victoria (Australia). Department of Civil and Environmental Engineering, International Technologies Centre

    2007-04-15

    The long-term planning of a future electricity supply system requires data about future demand. Planners who use the conventional planning method forecast future demand by observing past trends or alternatively by developing scenarios and then selecting the scenarios considered to be the most likely to occur. This method, however, fails to include future uncertainties. To consider such uncertainties, the scenario planning method may be used. This study uses this method to devise a long-term electricity supply plan for the Java-Madura-Bali electricity system. It was found that the scenario planning method could save up to US$3.5 billion over a 15-year period of the method was applied right at the beginning of the period. In the case of the Java-Madura-Bali system, which currently has excess installed capacity, the scenario planning method does not provide such large benefits. It was also found that introducing integrated coal gasification combined cycle and advanced gas combined cycle units would reduce greenhouse gas emissions from the Java-Madura-Bali system by approximately 230 million tonnes or 15% compared to a business-as-usual (BAU) scenario over a 15-year planning timeframe. The abatement cost was found to be US$4 per tonne of CO{sub 2}. (author)

  11. The future of trusts as an estate planning tool / Burger T.

    OpenAIRE

    Burger, Trinette

    2011-01-01

    Estate planning is an important exercise aimed at increasing, preserving and protecting assets during a person's lifetime and providing for the disposition and continued utilisation of these assets after his death. The minimisation of estate duty, however, often dominates the motivation behind estate planning and many of the tools, structures and techniques used as part of the estate planning exercise are aimed at reducing or avoiding estate duty. One of these tools is the trust. In the 2010 ...

  12. Adjustment of legally binding local plans

    DEFF Research Database (Denmark)

    Hvingel, Line Træholt; Aunsborg, Christian; Christensen, Finn Kjær

    2012-01-01

    Traditionally, and by law, new urban areas in Denmark are regulated and planned through legally binding local plans. Recently a tendency has occurred: The municipalities make the legally binding local plans quite open for future adjustment, and they are using a substantial amount of ‘empowerment ...... the considerations of legal rights, the extend of the legal use of empowerment provisions and the combination of the use of legal binding local plans and other legal instruments such as easements and sales agreements.......Traditionally, and by law, new urban areas in Denmark are regulated and planned through legally binding local plans. Recently a tendency has occurred: The municipalities make the legally binding local plans quite open for future adjustment, and they are using a substantial amount of ‘empowerment...... provisions’ which empower the municipalities to later ruling. This way of making plans postpones the actual regulation of an area (i.e. the planning permission) making it an individual ruling for instance at the application of building permits. Case studies show examples of this way of regulating an area...

  13. Back to the Future

    DEFF Research Database (Denmark)

    Damsø, Tue Noa Jacques; Christensen, Thomas Budde; Kjær, Tyge

    2014-01-01

    The article presents a backcasting-based approach to energy planning, and applies this to a case study on the development of an action plan aimed at the complete transition to renewable energy in the Danish Region of Zealand. Through the application of a systemic and target-oriented approach......, a step-by-step backcasting methodology is outlined and utilized. The article highlights the value of the backcasting approach in addressing key limitations of forecasting based planning approaches and underlining the need for flexibility concerning the deep uncertainty associated with energy futures....

  14. PV history: Lessons for the future

    Science.gov (United States)

    Ralph, E. L.

    1982-01-01

    A history of terrestrial photovoltaics is presented indicating that the photovoltaic potential was well perceived and a good technology developent plan was formulated and implemented. Major accomplishments of the technology plan are highlighted. Research objectives and research needs for the future are outlined.

  15. Special report: workshop on 4D-treatment planning in actively scanned particle therapy--recommendations, technical challenges, and future research directions.

    Science.gov (United States)

    Knopf, Antje; Bert, Christoph; Heath, Emily; Nill, Simeon; Kraus, Kim; Richter, Daniel; Hug, Eugen; Pedroni, Eros; Safai, Sairos; Albertini, Francesca; Zenklusen, Silvan; Boye, Dirk; Söhn, Matthias; Soukup, Martin; Sobotta, Benjamin; Lomax, Antony

    2010-09-01

    This article reports on a 4D-treatment planning workshop (4DTPW), held on 7-8 December 2009 at the Paul Scherrer Institut (PSI) in Villigen, Switzerland. The participants were all members of institutions actively involved in particle therapy delivery and research. The purpose of the 4DTPW was to discuss current approaches, challenges, and future research directions in 4D-treatment planning in the context of actively scanned particle radiotherapy. Key aspects were addressed in plenary sessions, in which leaders of the field summarized the state-of-the-art. Each plenary session was followed by an extensive discussion. As a result, this article presents a summary of recommendations for the treatment of mobile targets (intrafractional changes) with actively scanned particles and a list of requirements to elaborate and apply these guidelines clinically.

  16. Arroyo Management Plan (Alameda County): A Plan for Implementing Access and Restoring Riparian Habitats

    Science.gov (United States)

    Kent E. Watson; Jim Horner; Louise Mozingo

    1989-01-01

    Innovative techniques for restoring riparian habitats are of little value without a community endorsed plan for their implementation. A flood control district commissioned the Arroyo Management Plan in order to determine how it might provide public access and improve habitat along its current and future channels in a fast-growing area of Northern California. The Plan,...

  17. Status of the NASA Micro Pulse Lidar Network (MPLNET): overview of the network and future plans, new version 3 data products, and the polarized MPL

    Science.gov (United States)

    Welton, Ellsworth J.; Stewart, Sebastian A.; Lewis, Jasper R.; Belcher, Larry R.; Campbell, James R.; Lolli, Simone

    2018-04-01

    The NASA Micro Pulse Lidar Network (MPLNET) is a global federated network of Micro-Pulse Lidars (MPL) co-located with the NASA Aerosol Robotic Network (AERONET). MPLNET began in 2000, and there are currently 17 long-term sites, numerous field campaigns, and more planned sites on the way. We have developed a new Version 3 processing system including the deployment of polarized MPLs across the network. Here we provide an overview of Version 3, the polarized MPL, and current and future plans.

  18. Prediction of future urban growth using CA-Markov for urban sustainability planning of Banda Aceh, Indonesia

    Science.gov (United States)

    Achmad, A.; Irwansyah, M.; Ramli, I.

    2018-03-01

    Banda Aceh experienced rapid growth, both physically, socially, and economically, after the Tsunami that devastated it the end of December in 2004. Hence policy controls are needed to direct the pattern of urban growth to achieve sustainable development for the future. The purpose of this paper is to generate a growth model for Banda Aceh using the CA-Markov process. By knowing the changes in land use between 2005 and 2009 from the results of previous research, simulations for 2013, 2019 and 2029 using the application of Idrisi@Selva. CA-Markov models were prepared to determine the quantity of changes. The simulation results showed that, after the Tsunami, the City of Banda Aceh tended to grow towards the coast. For the control of the LUC, the Banda Aceh City government needs to prepare comprehensive and detailed maps and inventory of LUC for the city to provide basic data and information needed for monitoring and evaluation that can be done effectively and efficiently. An institution for monitoring and evaluation of the urban landscape and the LUC should be formed immediately. This institution could consist of representatives from government, academia, community leaders, the private sector and other experts. The findings from this study can be used to start the monitoring and evaluation of future urban growth. Especially for the coastal areas, the local government should immediately prepare special spatial coastal area plans to control growth in those areas and to ensure that the economic benefits from disaster mitigation and coastal protection are preserved. For the development of the city in the future, it is necessary to achieve a balance between economic development, and social welfare with environmental protection and disaster mitigation. iIt will become a big challenge to achieve sustainable development for the future.

  19. Governance and Vision: Visions of Cities towards a low-energy future

    International Nuclear Information System (INIS)

    Pares-Ramos, Isabel K.; Dupas, Stephane

    2010-07-01

    The overall aim of this report was to identify and review the process by which different cities have built visionary plans for the long-term sustainable development of their territory for a low-energy, climate-resilient future. We used a case studies approach to describe different methods used by cities to build their visionary plans and address present energy and climate change challenges. The purpose of this report is as well to contribute to the debate on the future of cities in the post-carbon society and to inspire further initiatives for a low-energy future. The first step towards understanding the visioning/planning process of cities for a low-energy future was to identify several initiatives were cities have developed a plan or statement to address energy and climate change issues in the next 20 to 50 years. These plans and documents were then reviewed in search of diverse and innovative methods and process for visioning, design and planning towards a low-carbon future. After these preliminary assessments and observations, we selected 4 cities based on the use of different methodologies for visioning, planning and development of the action plan and projects. Afterwards, we focused on the description of the visioning/planning process per city, based on information obtained from official plans and documents, and from interviews with local authorities and other personnel working for projects in each of the cities selected. The content of the interviews varied according to the local context of the initiative, but in general contained questions regarding methods and tools used to build their visions and action plans, as well as enquiries about the visioning steps and process, the role of stakeholders, and implementation strategies used to drive forward this initiatives

  20. Energy planning in Spain

    International Nuclear Information System (INIS)

    Cortina Garcia, J.

    1995-01-01

    This report aims to describe energy planning in Spain. It briefly analyses the three completed national energy plans (Plan Energetico Nacional, PEN). The fourth PEN 1991-2000 is analysed in detail, by reference to its objectives and characteristics and to developments during its first five years in operation. The Ministry of Industry and Energy has updated PEN en 1995, almost halfway through its period, and this is also summarised. Finally, there are some reflections on the future of energy planning. (Author) 46 refs

  1. Savannah River Site's Site Specific Plan

    International Nuclear Information System (INIS)

    1991-01-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering

  2. New opportunities for future tourism after 25 years of political and socioeconomic transformation – foresight in Poland’s tourism planning

    Directory of Open Access Journals (Sweden)

    Matylda Awedyk

    2016-09-01

    Full Text Available Purpose – The purpose of this paper is to present the changes in political and socioeconomic conditions after 25 years of transformation and how it provided to adopt new methodology in tourism planning. It shows the possibilities offered by the use of the foresight process in planning the development of tourism in Poland. Since one of the main foresight goals is to identify trends, the paper takes attempt to verify trends that occurred in Poland after 1989 and if they have now and will have in the near future influence on Polish tourism. Detailed objective is to characterize the systemic transformation and its impact on the tourism economy. Design/methodology/approach – Paper is the review, which used literature, legislation and strategic documents query. It also includes comparative analysis. Findings – The analysis of the political and economic changes that have taken place in Poland over the last 25 years shows that they were positive for the development of tourism base. The impact of globalization and global trends is now clearly noticeable also in Poland. Political and economic changes allow the use of foresight methodology in studies on the future of tourism while maintaining its main attributes: anticipation, participation, action, networking, vision. Research limitations/implications – The analysis included the impact of political changes and social trends on the tourist economy. Proposals that show the positive aspects of these changes relate to tourism and present extensive opportunities to create scenarios, both at the national and regional levels. Practical implications – The analysis forms the basis for the activities of tourism entities in Poland. It shows the characteristics for the future of the tourism market particularly the demand side. Social implications – The analysis of changes in systemic and social trends enables anticipation of changes in tourism as a social phenomenon. Originality/value – The paper

  3. Alternate Futures for 2025: Security Planning to Avoid Surprise

    National Research Council Canada - National Science Library

    Engelbrecht, Joseph

    1996-01-01

    .... The methodology details how the study participants identified the three drivers, created the strategic planning space, selected the worlds of interest, created the plausible histories, and developed...

  4. Academic visibility for urban planning and the webometric future

    Directory of Open Access Journals (Sweden)

    Sanchez Thomas W.

    2015-03-01

    Full Text Available The author focuses on the analysis problems of the main metrics of scientific productivity for the faculty in the USA universities specializing in the investigations and teaching in the field of urban planning. The increasing role of the Internet is highlighted in the process of communicating the ideas of planning scientists to the professionals and public, extending the reach of academic communications and possibilities of estimating the quality of the investigations and impact. Using case study the methods of applying webometrics for citation analysis in the Internet are investigated. The analysis focused on the main criteria: productivity, visibility, reputation, and impact. The article proposes an expanded approach for estimating general scientific popularity and impact of academics in the Internet, which includes publication analysis in frames of “gray literature”, teaching and outreach activity, which may also be a significant part of the scientific activity. The author stated the importance of academic visibility estimation both for promotion, improving competitiveness of a faculty member on the labor market in the sphere of educational services, and for urban planning schools’ development in general, raising their reputation, prestige and impact, getting the opportunities for financed researches, consolidating the positions on the global educational and science market.

  5. Solid waste management complex site development plan

    International Nuclear Information System (INIS)

    Greager, T.M.

    1994-01-01

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated

  6. Solid waste management complex site development plan

    Energy Technology Data Exchange (ETDEWEB)

    Greager, T.M.

    1994-09-30

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated.

  7. Current practice and future prospects for social data in coastal and ocean planning.

    Science.gov (United States)

    Le Cornu, Elodie; Kittinger, John N; Koehn, J Zachary; Finkbeiner, Elena M; Crowder, Larry B

    2014-08-01

    Coastal and ocean planning comprises a broad field of practice. The goals, political processes, and approaches applied to planning initiatives may vary widely. However, all planning processes ultimately require adequate information on both the biophysical and social attributes of a planning region. In coastal and ocean planning practice, there are well-established methods to assess biophysical attributes; however, less is understood about the role and assessment of social data. We conducted the first global assessment of the incorporation of social data in coastal and ocean planning. We drew on a comprehensive review of planning initiatives and a survey of coastal and ocean practitioners. There was significantly more incorporation of social data in multiuse versus conservation-oriented planning. Practitioners engaged a wide range of social data, including governance, economic, and cultural attributes of planning regions and human impacts data. Less attention was given to ecosystem services and social-ecological linkages, both of which could improve coastal and ocean planning practice. Although practitioners recognize the value of social data, little funding is devoted to its collection and incorporation in plans. Increased capacity and sophistication in acquiring critical social and ecological data for planning is necessary to develop plans for more resilient coastal and ocean ecosystems and communities. We suggest that improving social data monitoring, and in particular spatial social data, to complement biophysical data, is necessary for providing holistic information for decision-support tools and other methods. Moving beyond people as impacts to people as beneficiaries, through ecosystem services assessments, holds much potential to better incorporate the tenets of ecosystem-based management into coastal and ocean planning by providing targets for linked biodiversity conservation and human welfare outcomes. © 2014 Society for Conservation Biology.

  8. Present status and future plan of development on National Nuclear Forensics Library at JAEA

    International Nuclear Information System (INIS)

    Kimura, Yoshiki; Shinohara, Nobuo; Funatake, Yoshio; Sato, Kaneaki; Toda, Nobufumi; Shinoda, Yoshiharu; Watahiki, Masaru; Kuno, Yusuke

    2013-01-01

    Japan Atomic Energy Agency (JAEA) has initiated R and D project on nuclear forensics technology such as analytical technologies towards the establishment of nuclear forensics capabilities in Japan. National Nuclear Forensics Library (NNFL) is one of the fundamental nuclear forensics capabilities and a prototype NNFL has been developed as one topic of the R and D project at JAEA. Main objective of NNFL is to determine whether a seized nuclear or other radioactive material from nuclear security event (e.g. illicit trafficking) is originated from one's country or not. Analytical data of the seized material are compared with the existing materials populated in a NNFL, and its attributions such as origin and history will be identified. This paper describes the current status and future plan on the development of prototype NNFL. The outline and the results of the participation in an international table top exercise on NNFL named 'Galaxy Serpent' are also reported in the present paper. (author)

  9. Command and Control Planning and Teamwork: Exploring the Future

    National Research Council Canada - National Science Library

    Sterling, Bruce S; Lickteig, Carl W

    2000-01-01

    .... This paper examines how participant ratings of command and control planning and observer assessments of teamwork were related in a series of futuristic missions conducted by the Mounted Maneuver...

  10. Planning for a Sustainable Future of the Cincinnati Union Terminal

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2012-04-30

    The Cincinnati Museum Center invited a number of local stakeholders, political leaders, nationally and internationally recognized design professionals and the Design Team, that has been engaged to help shape the future of this remarkable resource, to work together in a Workshop that would begin to shape a truly sustainable future for both the Museum and its home, the Union Terminal, one of the most significant buildings in America. This report summarizes and highlights the discussions that took place during the Workshop and presents recommendations for shaping a direction and a framework for the future.

  11. Strategic Planning For The Fire Service

    Science.gov (United States)

    2016-03-01

    jamming, think in time, think in resources, think in life cycles, and think in experiments and bets .”197 Thinking in paradoxes is the strategic...decreasing costs. Futures methodology scenario planning would allow Fire Service leaders to think through plausible “what if” scenarios before they occur...while decreasing costs. Futures methodology scenario planning would allow Fire Service leaders to think through plausible “what if” scenarios before

  12. Status of the NASA Micro Pulse Lidar Network (MPLNET: overview of the network and future plans, new version 3 data products, and the polarized MPL

    Directory of Open Access Journals (Sweden)

    Welton Ellsworth J.

    2018-01-01

    Full Text Available The NASA Micro Pulse Lidar Network (MPLNET is a global federated network of Micro-Pulse Lidars (MPL co-located with the NASA Aerosol Robotic Network (AERONET. MPLNET began in 2000, and there are currently 17 long-term sites, numerous field campaigns, and more planned sites on the way. We have developed a new Version 3 processing system including the deployment of polarized MPLs across the network. Here we provide an overview of Version 3, the polarized MPL, and current and future plans.

  13. Heavy Vehicle Propulsion Materials: Recent Progress and Future Plans

    International Nuclear Information System (INIS)

    D. Ray Johnson; Sidney Diamond

    2001-01-01

    The Heavy Vehicle Propulsion Materials Program provides enabling materials technology for the U.S. DOE Office of Heavy Vehicle Technologies (OHVT). The technical agenda for the program is based on an industry assessment and the technology roadmap for the OHVT. A five-year program plan was published in 2000. Major efforts in the program are materials for diesel engine fuel systems, exhaust aftertreatment, and air handling. Additional efforts include diesel engine valve-train materials, structural components, and thermal management. Advanced materials, including high-temperature metal alloys, intermetallics, cermets, ceramics, amorphous materials, metal- and ceramic-matrix composites, and coatings, are investigated for critical engine applications. Selected technical issues and planned and ongoing projects as well as brief summaries of several technical highlights are given

  14. Principles of effective USA federal fire management plans

    Science.gov (United States)

    Meyer, Marc D.; Roberts, Susan L.; Wills, Robin; Brooks, Matthew L.; Winford, Eric M.

    2015-01-01

    Federal fire management plans are essential implementation guides for the management of wildland fire on federal lands. Recent changes in federal fire policy implementation guidance and fire science information suggest the need for substantial changes in federal fire management plans of the United States. Federal land management agencies are also undergoing land management planning efforts that will initiate revision of fire management plans across the country. Using the southern Sierra Nevada as a case study, we briefly describe the underlying framework of fire management plans, assess their consistency with guiding principles based on current science information and federal policy guidance, and provide recommendations for the development of future fire management plans. Based on our review, we recommend that future fire management plans be: (1) consistent and compatible, (2) collaborative, (3) clear and comprehensive, (4) spatially and temporally scalable, (5) informed by the best available science, and (6) flexible and adaptive. In addition, we identify and describe several strategic guides or “tools” that can enhance these core principles and benefit future fire management plans in the following areas: planning and prioritization, science integration, climate change adaptation, partnerships, monitoring, education and communication, and applied fire management. These principles and tools are essential to successfully realize fire management goals and objectives in a rapidly changing world.

  15. Coal: Energy for the future

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    This report was prepared in response to a request by the US Department of energy (DOE). The principal objectives of the study were to assess the current DOE coal program vis-a-vis the provisions of the Energy Policy Act of 1992 (EPACT), and to recommend the emphasis and priorities that DOE should consider in updating its strategic plan for coal. A strategic plan for research, development, demonstration, and commercialization (RDD and C) activities for coal should be based on assumptions regarding the future supply and price of competing energy sources, the demand for products manufactured from these sources, technological opportunities, and the need to control the environmental impact of waste streams. These factors change with time. Accordingly, the committee generated strategic planning scenarios for three time periods: near-term, 1995--2005; mid-term, 2006--2020; and, long-term, 2021--2040. The report is divided into the following chapters: executive summary; introduction and scope of the study; overview of US DOE programs and planning; trends and issues for future coal use; the strategic planning framework; coal preparation, coal liquid mixtures, and coal bed methane recovery; clean fuels and specialty products from coal; electric power generation; technology demonstration and commercialization; advanced research programs; conclusions and recommendations; appendices; and glossary. 174 refs.

  16. Reflexive Planning as Design and Work

    DEFF Research Database (Denmark)

    Lissandrello, Enza; Grin, John

    2011-01-01

    in planning emerges as a new tool for generating critical knowledge and dialogue that can synthesise the perspectives of multiple actors in a common understanding, existing structural constraints and a collective imagination of alternative future possibilities. Such research highlights the potential......In recent years, planning theorists have advanced various interpretations of the notion of reflexivity, inspired by American pragmatism, complexity theory, hermeneutics, discursive and collaborative planning. Scholars agree that “reflexivity” has a strong temporal dimension: it not only aims...... to solve present planning problems, but to imagine and understand alternative trajectories for future action. This article explores the practical utility of reflexivity for planners, through a case study that focuses on a project to promote sustainable development in the Port of Amsterdam. Reflexivity...

  17. Recent results and future plans for a 45 actuator adaptive x-ray optics experiment at the advanced light source

    Energy Technology Data Exchange (ETDEWEB)

    Brejnholt, Nicolai F., E-mail: brejnholt1@llnl.gov; Poyneer, Lisa A.; Hill, Randal M.; Pardini, Tommaso; Hagler, Lisle; Jackson, Jessie; Jeon, Jae; McCarville, Thomas J.; Palmer, David W. [Lawrence Livermore National Laboratory, Livermore, California (United States); Celestre, Richard [Advanced Light Source - Lawrence Berkeley National Laboratory, Berkeley, California (United States); Brooks, Audrey D. [Northrop Grumman - AOA Xinetics Inc., Cambridge, Massachusetts (United States)

    2016-07-27

    We report on the current status of the Adaptive X-ray Optics project run by Lawrence Livermore National Laboratory (LLNL). LLNL is collaborating with the Advanced Light Source (ALS) to demonstrate a near real-time adaptive X-ray optic. To this end, a custom-built 45 cm long deformable mirror has been installed at ALS beamline 5.3.1 (end station 2) for a two-year period that started in September 2014. We will outline general aspects of the instrument, present results from a recent experimental campaign and touch on future plans for the project.

  18. Future plans at ISOLDE

    International Nuclear Information System (INIS)

    Lindroos, Mats

    2003-01-01

    The CERN ISOLDE facility has operated for over 30 years delivering beams of exotic ions to an ever-growing user community. The facility went through a major up-grade in the early 1990s with the move from the 600 MeV synchrocyclotron to the 1 GeV PS-Booster proton synchrotron. This was followed by a primary proton beam energy up grade to 1.4 GeV in 1999. Lately, an important step forward was taken with the start of the REX-ISOLDE experiment for charge breeding and post-acceleration of exotic ions. CERN has recently decided on a consolidation project for the facility to assure that the required number of shifts can be delivered in the future. An overview will be given of the on-going consolidation and development programme and its implications on the physics programme, in particular the REX-ISOLDE post-accelerator experiment. An important parameter for a better yield of very exotic elements is the primary proton beam intensity, beam energy and time structure. The possible short-term improvements of, in particular, beam intensity will be discussed in some detail. While the main effort at CERN today goes towards the completion of the LHC, some resources have been found for accelerator R and D. A possible project is a new high intensity proton source at CERN, the superconducting proton linac, which could open the door to the construction of a next generation radioactive beam facility. The possible primary beam characteristics and some design considerations and their implications for such a facility will be discussed. Some ideas for the facility itself, such as the use of antiprotons and muons as new probes, production of a neutrino beam from stored radioactive ions and a preliminary design for a low energy storage ring, will be presented

  19. Neutrino Oscillations Present Status and Future Plans

    CERN Document Server

    Thomas, Jennifer

    2008-01-01

    This book reviews the status of a very exciting field - neutrino oscillations - at a very important time. The fact that neutrinos have mass has only been proved in the last few years and the acceptance of that fact has opened up a whole new area of study to understand the fundamental parameters of the mixing matrix. The book summarizes the results from all the experiments which have played a role in the measurement of neutrino oscillations and briefly describes the scope of some new planned experiments. Contributions include a theoretical introduction by Stephen Parke from FNAL, as well as art

  20. Strategic planning for neuroradiologists.

    Science.gov (United States)

    Berlin, Jonathan W; Lexa, Frank J

    2012-08-01

    Strategic planning is becoming essential to neuroradiology as the health care environment continues to emphasize cost efficiency, teamwork and collaboration. A strategic plan begins with a mission statement and vision of where the neuroradiology division would like to be in the near future. Formalized strategic planning frameworks, such as the strengths, weaknesses, opportunities and threats (SWOT), and the Balanced Scorecard frameworks, can help neuroradiology divisions determine their current position in the marketplace. Communication, delegation, and accountability in neuroradiology is essential in executing an effective strategic plan. Copyright © 2012 Elsevier Inc. All rights reserved.

  1. Futures of cities

    DEFF Research Database (Denmark)

    Bogen dokumenterer resultater fra den internationale kongres Futures of Cities arrangeret af IFHP International Federation of Housing and Planning, Realdania, Kunstakademiets Arkitektskole og City of Copenhagen. Kongressen blev afholdt i september 2007 i Øksnehallen og på Kunstakademiets...... Arkitektskole. Bogen  har 3 dele. Principles: Copenhagen Agenda for Sustainable Living, 10 principper udviklet af Ugebrevet Mandag Morgen illustreret af arkitektstuderende. Congress: Futures of Cities, Emerging Urbanisms- Emerging Practices, oplæg fra unge tegnestuer til temaet fremlagt på Student Congress...

  2. The future of energy use

    Energy Technology Data Exchange (ETDEWEB)

    Hill, R.; O' Keefe, P.; Snape, C.

    1994-12-15

    An analysis of the use of different forms of energy and its environmental and social impacts. Giving an overview of the development of different forms of energy provision and patterns of supply and demand, this book shows how enduse applies to energy industries, how the environment and social costs of energy use have to be introduced into energy planning and accounting and the crucial role of efficiency. Case studies will include the transport and building sectors of industrial economies, the use of stoves and woodfuel and agroforestry planning in developing countries. It will then examine the different forms of energy - conventional, nuclear and renewable - concluding by setting out different energy futures and the policy requirements for sustainable futures. (author)

  3. The Planning of Latin American Universities: In Search of Its Future.

    Science.gov (United States)

    Escala, Miguel J.

    College planning in Latin America is discussed, with attention to underdevelopment, political instability, and the economic crisis of the 1980s. Alternative planning approaches used in U.S. higher education institutions are considered. Latin America refers to 18 Spanish-speaking republics of the Western Hemisphere, along with Brazil and Haiti. The…

  4. Planning for Crew Exercise for Future Deep Space Mission Scenarios

    Science.gov (United States)

    Moore, Cherice; Ryder, Jeff

    2015-01-01

    Providing the necessary exercise capability to protect crew health for deep space missions will bring new sets of engineering and research challenges. Exercise has been found to be a necessary mitigation for maintaining crew health on-orbit and preparing the crew for return to earth's gravity. Health and exercise data from Apollo, Space Lab, Shuttle, and International Space Station missions have provided insight into crew deconditioning and the types of activities that can minimize the impacts of microgravity on the physiological systems. The hardware systems required to implement exercise can be challenging to incorporate into spaceflight vehicles. Exercise system design requires encompassing the hardware required to provide mission specific anthropometrical movement ranges, desired loads, and frequencies of desired movements as well as the supporting control and monitoring systems, crew and vehicle interfaces, and vibration isolation and stabilization subsystems. The number of crew and operational constraints also contribute to defining the what exercise systems will be needed. All of these features require flight vehicle mass and volume integrated with multiple vehicle systems. The International Space Station exercise hardware requires over 1,800 kg of equipment and over 24 m3 of volume for hardware and crew operational space. Improvements towards providing equivalent or better capabilities with a smaller vehicle impact will facilitate future deep space missions. Deep space missions will require more understanding of the physiological responses to microgravity, understanding appropriate mitigations, designing the exercise systems to provide needed mitigations, and integrating effectively into vehicle design with a focus to support planned mission scenarios. Recognizing and addressing the constraints and challenges can facilitate improved vehicle design and exercise system incorporation.

  5. Future Marine Polar Research Capacities - Science Planning and Research Services for a Multi-National Research Icebreaker

    Science.gov (United States)

    Biebow, N.; Lembke-Jene, L.; Wolff-Boenisch, B.; Bergamasco, A.; De Santis, L.; Eldholm, O.; Mevel, C.; Willmott, V.; Thiede, J.

    2011-12-01

    Despite significant advances in Arctic and Antarctic marine science over the past years, the polar Southern Ocean remains a formidable frontier due to challenging technical and operational requirements. Thus, key data and observations from this important region are still missing or lack adequate lateral and temporal coverage, especially from time slots outside optimal weather seasons and ice conditions. These barriers combined with the obligation to efficiently use financial resources and funding for expeditions call for new approaches to create optimally equipped, but cost-effective infrastructures. These must serve the international science community in a dedicated long-term mode and enable participation in multi-disciplinary expeditions, with secured access to optimally equipped marine platforms for world-class research in a wide range of Antarctic science topics. The high operational and technical performance capacity of a future joint European Research Icebreaker and Deep-sea Drilling Vessel (the AURORA BOREALIS concept) aims at integrating still separately operating national science programmes with different strategic priorities into joint development of long-term research missions with international cooperation both in Arctic and Antarctica. The icebreaker is planned to enable, as a worldwide first, autonomous year-round operations in the central Arctic and polar Southern Ocean, including severest ice conditions in winter, and serving all polar marine disciplines. It will facilitate the implementation of atmospheric, oceanographic, cryospheric or geophysical observatories for long-term monitoring of the polar environment. Access to the biosphere and hydrosphere e.g. beneath ice shelves or in remote regions is made possible by acting as advanced deployment platform for instruments, robotic and autonomous vehicles and ship-based air operations. In addition to a report on the long-term strategic science and operational planning objectives, we describe foreseen

  6. Future Scenarios for Mobile Science Learning

    Science.gov (United States)

    Burden, Kevin; Kearney, Matthew

    2016-01-01

    This paper adopts scenario planning as a methodological approach and tool to help science educators reconceptualise their use of mobile technologies across various different futures. These "futures" are set out neither as predictions nor prognoses but rather as stimuli to encourage greater discussion and reflection around the use of…

  7. Future plant of basic research for nuclear energy by university researchers

    International Nuclear Information System (INIS)

    Shibata, Toshikazu

    1984-01-01

    National Committee for Nuclear Energy Research, Japan Science Council has completed a future plan for basic nuclear energy research by university researchers. The JSC has recommended the promotion of basic research for nuclear energy based on the plan in 1983. The future plan consists of four main research fields, namely, (1) improvements of reactor safety, (2) down stream, (3) thorium fuel reactors, and (4) applications of research reactor and radioisotopes. (author)

  8. Towards sustainable energy planning and management

    DEFF Research Database (Denmark)

    Østergaard, Poul Alberg; Sperling, Karl

    2014-01-01

    Rising energy costs, anthropogenic climate change, and fossil fuel depletion calls for a concerted effort within energy planning to ensure a sustainable energy future. This article presents an overview of global energy trends focusing on energy costs, energy use and carbon dioxide emissions....... Secondly, a review of contemporary work is presented focusing on national energy pathways with cases from Ireland, Denmark and Jordan, spatial issues within sustainable energy planning and policy means to advance a sustainable energy future....

  9. Iraq's future

    International Nuclear Information System (INIS)

    Henderson, S.

    1998-01-01

    The large oil reserves of Iraq make it an important player in the long-term political energy world. This article briefly reviews the oil industry''s development and current status in Iraq and discusses the planned oil and gas field development. Finally there is a political discussion regarding the future of Iraq in terms of religion, race and neighbouring countries. (UK)

  10. Legal consequences of the special development plan 'power plant sites' on regional planning and on guidelines for building plans

    International Nuclear Information System (INIS)

    1978-01-01

    The Special Development Plan 'Power plant sites' was made compulsory by the regulation given by the Land government in Juli 1976. For extending the energy supply system this Special Development Plan intends to provide a sufficient amount of power plant sites suitably located with regard to present and future consumption centres and permitting a cooling by means of river water while safeguarding the interests of water resources policy. The Special Development Plan established in accordance with the articles 25 and 27 of the planning law of the Land lays down that 14 specified areas are to be kept free from utilization purposes which could be opposed to the realization of power plant projects. Thus the securing of these (potential) sites has become an objective of area planning and planning of the Land in the sense of article 5 paragraph 4 of the Federal law on area planning. (orig./HP) [de

  11. The role of decentralized generation and storage technologies in future energy systems planning for a rural agglomeration in Switzerland

    International Nuclear Information System (INIS)

    Yazdanie, Mashael; Densing, Martin; Wokaun, Alexander

    2016-01-01

    This study presents a framework to quantitatively evaluate decentralized generation and storage technology (DGST) performance and policy impacts in a rural setting. The role of DGSTs in the future energy systems planning of a rural agglomeration in Switzerland is examined using a cost optimization modeling approach. Heat and electricity demand for major sectors are considered. Scenarios introduce DGSTs in a stepwise manner to measure incremental impacts on future capacity planning compared to a baseline scenario. Sub-scenarios also examine the impacts of carbon mitigation policies, and a sensitivity analysis is carried out for key energy carriers and conversion technologies. DGSTs enable a significant reduction in electricity grid usage for the community considered. Small hydro with a storage reservoir and photovoltaics enable the community to become largely self-sufficient with over 80% reductions in grid imports by 2050 compared to the baseline scenario. Storage enables maximum usage of the available hydro potential which also leads to network upgrade deferrals and a significant increase in photovoltaic installations. Investment decisions in small hydro are robust against cost variations, while heating technology investment decisions are sensitive to oil and grid electricity prices. Carbon pricing policies are found to be effective in mitigating local fossil fuel emissions. - Highlights: •Rural case study on decentralized generation and storage technology (DGST) benefits. •Cost optimization model and scenarios developed to assess DGSTs until 2050. •Small hydro and photovoltaics (PV) increase self-sufficiency of community. •Storage enables full hydro potential usage and increased PV penetration. •Carbon price policies effective in mitigating local fossil fuel emissions.

  12. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex

  13. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  14. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  15. International benchmark and best practices on national infrastructure plans. Application to Spanish strategic planning

    Energy Technology Data Exchange (ETDEWEB)

    Pino Hernandez, E.M.; Delgado Quiralte, C.

    2016-07-01

    The need for planning regarding investment in infrastructures is recognised and supported by most governments around the world. Planning helps to take effective and correct decisions, provides a basis for monitoring its impacts and also facilitates further developments. However it requires a high level of organization, coordination among stakeholders and anticipation of transport needs. There are some different methodological approaches for strategic planning. This paper examines the importance of infrastructure planning and how it is undertaken in different countries from Europe and other continents. It is based on a benchmarking about planning procedures of 7 reference countries (UK, France, the Netherlands, Poland, Germany, Japan and USA), in addition to others whose strategic plans are being developed at the present moment such as Croatia or Romania. This benchmarking aims to extract and compare best practices carried out in this field and to define the optimal formulation of strategic planning. In this regard, the benchmarking is focused on some key aspects: firstly, on the plan structure and its main contents. There are a lot of differences about how each country defines the future needs for transport and how it establishes the objectives and the strategies to be followed. Secondly, on the characterisation of the authorities which are responsible of the plan development (level of dependence from the government, know-how…) along with the time frame and final validity of the plans. And finally, the level of detail of the proposed actions and budgetary commitments provided by the strategic plans. Throughout the comparative analysis, the knowledge generated by this benchmarking has allowed setting a series of specific recommendations in strategic planning which can be applied as innovative solutions and best practices in future planning processes in Spain. (Author)

  16. The future role of the automobile in Canada. Le role future de l'automobile au Canada

    Energy Technology Data Exchange (ETDEWEB)

    Khan, A.M.

    1982-03-01

    This paper describes the future role of the automobile from an intercity transportation perspective in multimodal contexts; it identifies courses of action open to Transport Canada officials in support of the suggested role. Discussed here is the automobile's multifaceted role, focussing mainly on its use as a mode of door-to-door travel for short trips, a feeder as well as an adjunct to public modes, a means of avoiding excessible public expenditure in highly subsidized public modes (e.g., rail), and a means for providing basic mobility in regional travel contexts. This study goes beyond the 1979 Transport Canada report with the same title by recommending courses of action that might assist officials in formulating policy, planning and other endeavours. At the outset, updated information is provided on the current status and future outlook of selected important factors that affect the future transportation role of the automobile. Against this background, the relevance of major findings of the 1979 automobile report are reviewed and gaps in knowledge identified. On the basis of this information, a future role for the automobile is discussed, with appropriate courses of action recommended. These recommendations and their institutional/program implications are addressed to Transport Canada in the areas of strategic planning and policy, energy planning, safety and coordination of actions/programs with other federal government departments and provincial governments. 48 refs., 8 tabs.

  17. Strategic Planning and the Long-term R&D Plan

    International Nuclear Information System (INIS)

    Cooley, J.

    2015-01-01

    The Department of Safeguards of the International Atomic Energy Agency implements a structured strategic planning process to ensure that safeguards will continue to be both effective and efficient in the future. This process provides the Department with a comprehensive and coherent planning framework for the short (2 years), medium (6 years) and long (12 years) term. The Department's suite of planning documents includes a long-term strategic plan and an associated long-term research and development plan as well as a biennial development and implementation support programme. The Department's Long-Term Strategic Plan 2012-2023 addresses the conceptual framework for safeguards implementation, legal authority, technical capabilities (expertise, equipment and infrastructure) and the human and financial resources necessary for Agency verification activities. As research and development (R&D) are essential to meet the safeguards needs of the future, the Department-s Long-Term R&D Plan 2012-2023 is designed to support the Long-Term Strategic Plan 2012-2023 by setting out the capabilities that the Department needs to achieve its strategic objectives, and key milestones towards achieving those capabilities for which Member State R&D support is needed. The Long-Term R&D Plan 2012-2023 addresses the Department's R&D requirements in areas such as safeguards concepts and approaches; detection of undeclared nuclear material and activities; safeguards equipment and communication; information technology, collection, analysis and security; analytical services; new mandates; and training. Long-term capabilities discussed in the presentation include deployed systems (e.g., equipment at facilities); analytical (e.g., sample analysis), operational (e.g., staff expertise and skills) and readiness (e.g., safeguarding new types of facilities) capabilities. To address near-term development objectives and support the implementation of its verification activities as well as to

  18. TIME TO CHANGE : The foreseeable future for water planning

    NARCIS (Netherlands)

    Segrave, A.J.

    2014-01-01

    The decisions people make, and the actions they take, depend on how they conceptualize and experience time. This fundamental and influential factor is seldom acknowledged, little understood, and rarely considered explicitly in planning; be that for the material systems or the knowledge systems in

  19. Outline of J-PARC and development of J-PARC from nuclear physics future plan

    International Nuclear Information System (INIS)

    Nagamiya, Shoji

    2006-01-01

    The origin of the Nuclear Physics Future Plan was the NUMATRON project, with which high energy heavy ions were to be accelerated. This project was not successful and another project 'Large Hadron Project' was proposed in 1986 to deliver both of high energy heavy ions and high intensity protons. This project was somewhat modified to build a 1GeV 200μA proton linac in KEK (Institute for High Energy Physics) site to produce pulsed neutrons, pulsed muons and unstable nuclei as a first step to 'Japan Hadron Project'. The linac was expected also to be an injector for KEK 12GeV synchrotron. In 2001 accelerator projects under the Ministry of Education and the Science and Technology Agency were unified to form J-PARC project, which was approved on a chance when the former two government organizations were integrated. J-PARC project aims at performing the materials and life sciences by 3GeV protons, nuclear and elementary particle physics by 50GeV protons and the researches on nuclear transmutation by 0.6GeV protons. (K.Y.)

  20. The 1990 progress report and future plans

    Science.gov (United States)

    Friedland, Peter; Zweben, Monte; Compton, Michael

    1990-01-01

    This document describes the progress and plans of the Artificial Intelligence Research Branch (RIA) at ARC in 1990. Activities span a range from basic scientific research to engineering development and to fielded NASA applications, particularly those applications that are enabled by basic research carried out at RIA. Work is conducted in-house and through collaborative partners in academia and industry. Our major focus is on a limited number of research themes with a dual commitment to technical excellence and proven applicability to NASA short, medium, and long-term problems. RIA acts as the Agency's lead organization for research aspects of artificial intelligence, working closely with a second research laboratory at JPL and AI applications groups at all NASA centers.

  1. The Global Geostationary Wildfire ABBA: Current Implementation and Future Plans

    Science.gov (United States)

    Prins, E.; Schmidt, C. C.; Hoffman, J.; Brunner, J.; Hyer, E. J.; Reid, J. S.

    2012-12-01

    The Wild Fire Automated Biomass Burning Algorithm (WF_ABBA), developed at the Cooperative Institute for Meteorological Satellite Studies (CIMSS), has a long legacy of operational near real-time wildfire detection and characterization in the Western Hemisphere. The first phase of the global geostationary WF_ABBA was made operational at NOAA NESDIS in 2009 and currently includes diurnal active fire monitoring from GOES-East, GOES-South America, GOES-West, Meteosat-9 and MTSAT-1R/-2. This allows for near global active fire monitoring with coverage of Europe, Africa, Southeast Asia and the Western Pacific utilizing distinct geostationary sensors and a consistent algorithm. Version 6.5.006 of the WF_ABBA was specifically designed to address the capabilities and limitations of diverse geostationary sensors and requests from the global fire monitoring and user community. This presentation will provide an overview of version 6.5.006 of the global WF_ABBA fire product including the new fire and opaque cloud mask and associated metadata. We will demonstrate the WF_ABBA showing examples from around the globe with a focus on the capabilities and plans for integrating new geostationary platforms with coverage of Eastern Europe and Asia (INSAT-3D, Korean COMS, Russian GOMS Elektro-L MSU-GS). We are also preparing for future fire monitoring in the Western Hemisphere, Europe, and Africa utilizing the next generation GOES-R Imager and Meteosat Third Generation Flexible Combined Imager (MTG - FCI). The goal is to create a globally consistent long-term fire product utilizing the capabilities of each of these unique operational systems and a common fire detection algorithm. On an international level, development of a global geostationary fire monitoring system is supported by the IGOS GOFC/GOLD Fire Implementation Team. This work also generally supports Committee on Earth Observation Satellites (CEOS) activities and the Group on Earth Observations (GEO).

  2. Strategic Human Resource Planning in Academia

    Science.gov (United States)

    Ulferts, Gregory; Wirtz, Patrick; Peterson, Evan

    2009-01-01

    A strategic plan guides a college in successfully meeting its mission. Based on the strategic plan, a college can develop a human resource plan that will allow it to make management decisions in the present to support the future direction of the college. The overall purpose of human resource management is to: (1) ensure the organization has…

  3. Marketing planning by learning: "Plearning" approach

    Directory of Open Access Journals (Sweden)

    Ilić Milovan M.

    2006-01-01

    Full Text Available This work emphasizes that the final outcome of planning is not only the benefit of having the ready plan but showing that the very process of planning through which a business goes through, is important. Here we consider the process of learning in order to get a complete picture of current and future business processes. Three stages of learning are included. The first stage describes the current position of the business; the second stage describes the position of the business in the future and the last stage shows how the business will achieve these objectives. The focus of planning should be deciding on internal communication which form the basis for gaining the competitive advantage. One of the ways for carrying out this analysis is creating the matrix based on gaining competitive advantage through using resources.

  4. The future of AIDS in Africa: lessons from two scenario projects ...

    African Journals Online (AJOL)

    Scenario planning or futures studies have their origin in military planning, but have also been used with great success in the private sector, most notably in the energy industry. UNAIDS and the South African financial services group Metropolitan each recently published a set of scenarios regarding the future impact of ...

  5. Samish Indian Nation Long-Term Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    Christine Woodward; B. Beckley; K. Hagen

    2005-06-30

    The Tribes strategic energy planning effort is divided into three phases: (1) Completing an Energy Resource Assessment; (2) Developing a Long-Term Strategic Energy Plan; and (3) Preparing a Strategic Energy Implementation Plan for the Samish Homelands. The Samish Indian Nation developed a comprehensive Strategic Energy plan to set policy for future development on tribal land that consists of a long-term, integrated, systems approach to providing a framework under which the Samish Community can use resources efficiently, create energy-efficient infrastructures, and protect and enhance quality of life. Development of the Strategic Energy plan will help the Samish Nation create a healthy community that will sustain current and future generations by addressing economic, environmental, and social issues while respecting the Samish Indian Nation culture and traditions.

  6. A social work study on different factors influencing youth on hope for the future

    Directory of Open Access Journals (Sweden)

    Akram Fakhri Fakhramini

    2013-03-01

    Full Text Available In this paper, we present an empirical study to study the effects of religious duties, communicating with parents; leisure, media planning, city planning, socio-economic and education on different factors influencing the future of youth. The proposed study of this paper designs a questionnaire and distributes it among 400 people aged 18 to 29 and the results are investigated using Pearson correlation ratios. The results of our investigation indicate that there are some positive and meaningful relationship between religious duties and their hope for future (r=44%, a positive and meaningful relationship between leisure and hope for future (31%. In addition, there is a relatively positive and somewhat meaningful relationship between city planning and hope for future (15% and finally, a small but positive relationship between media planning and hope for the future (6%. However, there is no evidence belief that there is any meaningful relationship between education and hope for the future.

  7. The 2000 DOD Financial Management Improvement Plan

    National Research Council Canada - National Science Library

    2001-01-01

    .... As a result, DoD has prepared the Financial Management Improvement Plan (the Plan), which is a strategic framework that includes the Departments financial management concept of operations for the future...

  8. Water Resource Planning Under Future Climate and Socioeconomic Uncertainty in the Cauvery River Basin in Karnataka, India

    Science.gov (United States)

    Bhave, Ajay Gajanan; Conway, Declan; Dessai, Suraje; Stainforth, David A.

    2018-02-01

    Decision-Making Under Uncertainty (DMUU) approaches have been less utilized in developing countries than developed countries for water resources contexts. High climate vulnerability and rapid socioeconomic change often characterize developing country contexts, making DMUU approaches relevant. We develop an iterative multi-method DMUU approach, including scenario generation, coproduction with stakeholders and water resources modeling. We apply this approach to explore the robustness of adaptation options and pathways against future climate and socioeconomic uncertainties in the Cauvery River Basin in Karnataka, India. A water resources model is calibrated and validated satisfactorily using observed streamflow. Plausible future changes in Indian Summer Monsoon (ISM) precipitation and water demand are used to drive simulations of water resources from 2021 to 2055. Two stakeholder-identified decision-critical metrics are examined: a basin-wide metric comprising legal instream flow requirements for the downstream state of Tamil Nadu, and a local metric comprising water supply reliability to Bangalore city. In model simulations, the ability to satisfy these performance metrics without adaptation is reduced under almost all scenarios. Implementing adaptation options can partially offset the negative impacts of change. Sequencing of options according to stakeholder priorities into Adaptation Pathways affects metric satisfaction. Early focus on agricultural demand management improves the robustness of pathways but trade-offs emerge between intrabasin and basin-wide water availability. We demonstrate that the fine balance between water availability and demand is vulnerable to future changes and uncertainty. Despite current and long-term planning challenges, stakeholders in developing countries may engage meaningfully in coproduction approaches for adaptation decision-making under deep uncertainty.

  9. Proceedings of the CEATI 2010 distribution planning workshop

    International Nuclear Information System (INIS)

    2010-01-01

    This workshop provided a forum for electrical industry distribution experts to discuss methods of distribution planning that will ensure the provision of low-cost and reliable electrical service to present and future customers. Participants in the workshop discussed methods of integrating renewable energy resources, maximizing the use of existing assets, and reducing the carbon footprint of electric utilities. The effects of new loads on reliability, power quality, and voltage stability were considered. Planning distribution system modifications for the future were reviewed. The workshop provided an overview of distribution planning in relation to smart grids. The workshop included sessions on distribution planning for the 21. century; planning for a smarter grid; integrating renewable energy into the distribution system; and planning to manage reliability. The workshop featured 22 presentations, of which 16 have been catalogued separately for inclusion in this database. tabs., figs.

  10. Progress in tourism planning and policy

    DEFF Research Database (Denmark)

    Dredge, Dianne; Jamal, Tazim

    2015-01-01

    This paper examines progress in tourism planning and policy knowledge and identifies gaps and future directions for research. The study employs a post-structuralist perspective presented in two analytical movements: a bibliographic study of tourism policy and planning publications in Scopus...

  11. Carbon dioxide removal and the futures market

    Science.gov (United States)

    Coffman, D.'Maris; Lockley, Andrew

    2017-01-01

    Futures contracts are exchange-traded financial instruments that enable parties to fix a price in advance, for later performance on a contract. Forward contracts also entail future settlement, but they are traded directly between two parties. Futures and forwards are used in commodities trading, as producers seek financial security when planning production. We discuss the potential use of futures contracts in Carbon Dioxide Removal (CDR) markets; concluding that they have one principal advantage (near-term price security to current polluters), and one principal disadvantage (a combination of high price volatility and high trade volume means contracts issued by the private sector may cause systemic economic risk). Accordingly, we note the potential for the development of futures markets in CDR, but urge caution about the prospects for market failure. In particular, we consider the use of regulated markets: to ensure contracts are more reliable, and that moral hazard is minimised. While regulation offers increased assurances, we identify major insufficiencies with this approach—finding it generally inadequate. In conclusion, we suggest that only governments can realistically support long-term CDR futures markets. We note existing long-term CDR plans by governments, and suggest the use of state-backed futures for supporting these assurances.

  12. SCORPIO-BWR: status and future plans

    International Nuclear Information System (INIS)

    Porsmyr, Jan; Bodal, Terje; Beere, William H.

    2004-01-01

    Full text: During the years from 2000 to 2003 a joint project has been performed by IFE, Halden and TEPCO Systems Corporation, Japan, to develop a core monitoring system for BWRs based on the their existing core monitoring system TiARA and the SCORPIO framework. It has been emphasised to develop a reliable, flexible, adaptable and user-friendly system, which is easy to maintain. Therefore, a rather general framework (SCORPIO Framework) has been used which facilitates easy software modifications as well as adding/ replacing physics modules. The software modules is integrated in the SCORPIO framework using the Software Bus as the communication tool and with the Picasso UIMS tool for MMI. The SCORPIO-BWR version is developed on a Windows-PC platform. The SCORPIO-BWR version provides all functions, which are necessary for all analyses and operations performed on a BWR plant and comprises functions for on-line core monitoring, predictive analysis and core management with interfaces to plant instrumentation and physics codes. Functions for system initialisation and maintenance are also included. A SCORPIO-BWR version adapted for ABWR was installed in TEPSYS facilities in Tokyo in January 2003, where the final acceptance tests were carried out and accepted. The ABWR version of the system is now in the verification and validation phase. In the period from April 2003 until March 2004 a project for realizing an offline-version of SCORPIO-BWR system, which supports the offline tasks of BWR in-core fuel management for ABWR and BWR-5 type of reactors, was developed. The offline-version of the SCORPIO-BWR system for ABWR and BWR-5 type of reactors was installed at TEPSYS in March 2003, where the final acceptance tests were carried out and accepted. Plans for the next version of this system is to study the possibility of adapting SCORPIO-BWR to work with 'mobile technology'. This means that it should be possible to access and display information from the SCORPIO-BWR system on a

  13. SCORPIO-BWR: status and future plans

    Energy Technology Data Exchange (ETDEWEB)

    Porsmyr, Jan; Bodal, Terje; Beere, William H. (and others)

    2004-07-01

    Full text: During the years from 2000 to 2003 a joint project has been performed by IFE, Halden and TEPCO Systems Corporation, Japan, to develop a core monitoring system for BWRs based on the their existing core monitoring system TiARA and the SCORPIO framework. It has been emphasised to develop a reliable, flexible, adaptable and user-friendly system, which is easy to maintain. Therefore, a rather general framework (SCORPIO Framework) has been used which facilitates easy software modifications as well as adding/ replacing physics modules. The software modules is integrated in the SCORPIO framework using the Software Bus as the communication tool and with the Picasso UIMS tool for MMI. The SCORPIO-BWR version is developed on a Windows-PC platform. The SCORPIO-BWR version provides all functions, which are necessary for all analyses and operations performed on a BWR plant and comprises functions for on-line core monitoring, predictive analysis and core management with interfaces to plant instrumentation and physics codes. Functions for system initialisation and maintenance are also included. A SCORPIO-BWR version adapted for ABWR was installed in TEPSYS facilities in Tokyo in January 2003, where the final acceptance tests were carried out and accepted. The ABWR version of the system is now in the verification and validation phase. In the period from April 2003 until March 2004 a project for realizing an offline-version of SCORPIO-BWR system, which supports the offline tasks of BWR in-core fuel management for ABWR and BWR-5 type of reactors, was developed. The offline-version of the SCORPIO-BWR system for ABWR and BWR-5 type of reactors was installed at TEPSYS in March 2003, where the final acceptance tests were carried out and accepted. Plans for the next version of this system is to study the possibility of adapting SCORPIO-BWR to work with 'mobile technology'. This means that it should be possible to access and display information from the SCORPIO

  14. Inspection planning

    International Nuclear Information System (INIS)

    Korosec, D.; Levstek, M.F.

    2001-01-01

    Slovenian Nuclear Safety Administration (SNSA) division of nuclear and radiological safety inspection has developed systematic approach to their inspections. To be efficient in their efforts regarding regular and other types of inspections, in past years, the inspection plan has been developed. It is yearly based and organized on a such systematic way, that all areas of nuclear safety important activities of the licensee are covered. The inspection plan assures appropriate preparation for conducting the inspections, allows the overview of the progress regarding the areas to be covered during the year. Depending on the licensee activities and nature of facility (nuclear power plant, research reactor, radioactive waste storage, others), the plan has different levels of intensity of inspections and also their frequency. One of the basic approaches of the plan is to cover all nuclear and radiological important activities on such way, that all regulatory requests are fulfilled. In addition, the inspection plan is a good tool to improve inspection effectiveness based on previous experience and allows to have the oversight of the current status of fulfillment of planned inspections. Future improvement of the plan is necessary in the light of newest achievements on this field in the nuclear world, that means, new types of inspections are planned and will be incorporated into plan in next year.(author)

  15. Fiscal year 1987 program plan

    International Nuclear Information System (INIS)

    1986-12-01

    The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, operation, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 87 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Operations, and Research ampersand Development (R ampersand D), the organizational interfaces and communication channels for R ampersand D and the establishment of procedures for planning, reporting, and budgeting of Operations and R ampersand D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY 87; outyear budget projections are presented for future years

  16. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Hathaway, H.B.; Daly, K.S.; Rinne, C.A.; Seiler, S.W.

    1993-05-01

    The Hanford Site Development Plan (HSDP) provides an overview of land use, infrastructure, and facility requirements to support US Department of Energy (DOE) programs at the Hanford Site. The HSDP's primary purpose is to inform senior managers and interested parties of development activities and issues that require a commitment of resources to support the Hanford Site. The HSDP provides an existing and future land use plan for the Hanford Site. The HSDP is updated annually in accordance with DOE Order 4320.1B, Site Development Planning, to reflect the mission and overall site development process. Further details about Hanford Site development are defined in individual area development plans

  17. Maintenance Planning for Historic Buildings

    Directory of Open Access Journals (Sweden)

    Diana Plian

    2008-01-01

    Full Text Available The key to good maintenance of historic buildings is a long-range maintenance plan. Long-range planning recognizes a responsibility to the future to prolong the useful life of a building by preserving it in its present condition and preventing or slowing deterioration and damage from natural or other causes.

  18. How Europe Plans Its Energy Future and How Croatia Tries to Do It

    International Nuclear Information System (INIS)

    Urli, N.

    2009-01-01

    Although each country is independent in planning its energy development and investment in energy sources, up to now, EU has put forward a great number of recommendations, directives, and legally binding documents for its member states and for the new countries joining EU in a near future. In December 2008, the EU Parliament and the European Commission declared the so-called 20%/20%/20% legally binding document, requesting, up to 2020, a decrease in emission of greenhouse gases, a decrease in energy consumption by increasing energy efficiency, and an adequate contribution of renewable energy sources in the total energy consumption (all in cited percentages). 60 percent of generated electricity should be provided by 'low carbon' technologies, i.e. in approximately equal shares between nuclear and renewable energy sources. The rest will be provided by gas and coal (under condition of development of capturing and underground storage of emitted CO 2 ). Oil would still cover 40 to 50 percent of primary energy demand predominating in transport sector, and Europe will still be very dependent on oil and gas import. In 2008, Croatia started to plan its new energy strategy with the aim to replace the strategy adopted in 2002. In November 2008, the first draft of the new strategy was announced and available for open public discussion for duration of one month. There have been a number of constructive proposals improving the first draft. However, this period was followed by a silence and no answer to the proposals up to the June 2009 when a completely new final text of the strategy document was drafted under strong influence of the coal and oil lobbies, to be offered for acceptance by the Croatian Parliament, which finally accepted the strategy in the form proposed. In this final version, great savings potentials in civil engineering and construction industry were totally neglected as well as new revolutionary development in solar photovoltaic conversion technologies, ignoring

  19. Mercury flow tests (first report). Wall friction factor measurement tests and future tests plan

    International Nuclear Information System (INIS)

    Kaminaga, Masanori; Kinoshita, Hidetaka; Haga, Katsuhiro; Hino, Ryutaro; Sudo, Yukio

    1999-07-01

    In the neutron science project at JAERI, we plan to inject a pulsed proton beam of a maximum power of 5 MW from a high intense proton accelerator into a mercury target in order to produce high energy neutrons of a magnitude of ten times or more than existing facilities. The neutrons produced by the facility will be utilized for advanced field of science such as the life sciences etc. An urgent issue in order to accomplish this project is the establishment of mercury target technology. With this in mind, a mercury experimental loop with the capacity to circulate mercury up to 15 L/min was constructed to perform thermal hydraulic tests, component tests and erosion characteristic tests. A measurement of the wall friction factor was carried out as a first step of the mercury flow tests, while testing the characteristic of components installed in the mercury loop. This report presents an outline of the mercury loop and experimental results of the wall friction factor measurement. From the wall friction factor measurement, it was made clear that the wettability of the mercury was improved with an increase of the loop operation time and at the same time the wall friction factors were increased. The measured wall friction factors were much lower than the values calculated by the Blasius equation at the beginning of the loop operation because of wall slip caused by a non-wetted condition. They agreed well with the values calculated by the Blasius equation within a deviation of 10% when the sum of the operation time increased more than 11 hours. This report also introduces technical problems with a mercury circulation and future tests plan indispensable for the development of the mercury target. (author)

  20. Transformation of a virtual action plan into a motor plan in the premotor cortex.

    Science.gov (United States)

    Nakayama, Yoshihisa; Yamagata, Tomoko; Tanji, Jun; Hoshi, Eiji

    2008-10-08

    Before preparing to initiate a forthcoming motion, we often acquire information about the future action without specifying actual motor parameters. The information for planning an action at this conceptual level can be provided with verbal commands or nonverbal signals even before the associated motor targets are visible. Under these conditions, the information signifying a virtual action plan must be transformed to information that can be used for constructing a motor plan to initiate specific movements. To determine whether the premotor cortex is involved in this process, we examined neuronal activity in the dorsal premotor cortex (PMd) of monkeys performing a behavioral task designed to isolate the behavioral stages of the acquisition of information for a future action and the construction of a motor plan. We trained the animals to receive a symbolic instruction (color and shape of an instruction cue) to determine whether to select the right or left of targets to reach, despite the physical absence of targets. Subsequently, two targets appeared on a screen at different locations. The animals then determined the correct target (left or right) based on the previous instruction and prepared to initiate a reaching movement to an actual target. The experimental design dissociated the selection of the right/left at an abstract level (action plan) from the physical motor plan. Here, we show that activity of individual PMd neurons initially reflects a virtual action plan transcending motor specifics, before these neurons contribute to a transformation process that leads to activity encoding a motor plan.

  1. Trying to Predict the Future - Resource Planning and Allocation in CMS

    CERN Document Server

    Kreuzer, Peter; Fisk, Ian; Merino, Gonzalo

    2012-01-01

    In the large LHC experiments the majority of computing resources are provided by the participating countries. These resource pledges account for more than three quarters of the total available computing. The experiments are asked to give indications of their requests three years in advance and to evolve these as the details and constraints become clearer. In this presentation we will discuss the resource planning techniques used in CMS to predict the computing resources several years in advance. We will discuss how we attempt to implement the activities of the computing model in spreadsheets and formulas to calculate the needs. We will talk about how those needs are reflected in the 2012 running and how the planned long shutdown of the LHC in 2013 and 2014 impact the planning process and the outcome. In the end we will speculate on the computing needs in the second major run of LHC.

  2. New Strategic Plan Takes the ALS into the Future

    International Nuclear Information System (INIS)

    Kirz, J.; Chemla, D. S.; Feinberg, B.; Krebs, G. F.; Padmore, H. A.; Robin, D. S.; Robinson, A. L.; Smith, N. V.; Warwick, T.; Hussain, Z.

    2007-01-01

    A new strategic plan is in place to upgrade the ALS so it can continue to address fundamental questions, such as size-dependent and dimensional-confinement phenomena at the nanoscale; correlation and complexity in physical, biological, and environmental systems; and temporal evolution, assembly, dynamics and ultrafast phenomena. Moreover, the growing number of ALS users (now exceeding 2,000 per year) requires increased attention. Accordingly, our plan concentrates on projects that will continue to make it possible for ALS users to address grand scientific and technological challenges with incisive world-class tools and quality user support. Our highest priority is to begin top-off operation, in which electrons are injected into the storage ring at intervals of approximately 1 minute. The combination of top-off and concurrent development of small-gap in-vacuum undulators and superconducting undulators will allow an increase in brightness from eight to more than 100 times, depending on the specific undulators and photon energy range. As part of our core mission in the VUV and soft x-ray regions, we plan to exploit these accelerator developments to extend our capabilities for high spatial and temporal resolution and utilize the remarkable coherence properties of the ALS in a new generation of beamlines. Ranked by priority, several proposed beamlines will follow completion of five new beamlines already under construction or funded. The intellectual excitement of the ALS has been a powerful tool in the recruitment and retention of outstanding staff, but additional sustained efforts are required to increase diversity both in gender and in underrepresented groups. To this end, we intend to expand the ALS Doctoral Fellowship Program by giving special emphasis to underrepresented groups. We also envision a distinguished postdoctoral fellowship program with the same emphasis, to increase and diversify our pool of candidates for beamline scientist positions

  3. New Strategic Plan Takes the ALS into the Future

    International Nuclear Information System (INIS)

    Kirz, J.; Chemla, D.S.; Feinberg, B.; Hussain, Z.; Krebs, G.F.; Padmore, H.A.; Robin, D.S.; Robinson, A.L.; Smith, N.V.; Warwick, T.

    2006-01-01

    A new strategic plan is in place to upgrade the ALS so it can continue to address fundamental questions, such as size-dependent and dimensional-confinement phenomena at the nanoscale; correlation and complexity in physical, biological, and environmental systems; and temporal evolution, assembly, dynamics and ultrafast phenomena. Moreover, the growing number of ALS users (now exceeding 2,000 per year) requires increased attention. Accordingly, our plan concentrates on projects that will continue to make it possible for ALS users to address grand scientific and technological challenges with incisive world-class tools and quality user support. Our highest priority is to begin top-off operation, in which electrons are injected into the storage ring at intervals of approximately 1 minute. The combination of top-off and concurrent development of small-gap in-vacuum undulators and superconducting undulators will allow an increase in brightness from eight to more than 100 times, depending on the specific undulators and photon energy range. As part of our core mission in the VUV and soft x-ray regions, we plan to exploit these accelerator developments to extend our capabilities for high spatial and temporal resolution and utilize the remarkable coherence properties of the ALS in a new generation of beamlines. Ranked by priority, several proposed beamlines will follow completion of five new beamlines already under construction or funded. The intellectual excitement of the ALS has been a powerful tool in the recruitment and retention of outstanding staff, but additional sustained efforts are required to increase diversity both in gender and in under represented groups. To this end, we intend to expand the ALS Doctoral Fellowship Program by giving special emphasis to under represented groups. We also envision a distinguished postdoctoral fellowship program with the same emphasis, to increase and diversify our pool of candidates for beamline scientist positions

  4. Environmental Measurements Laboratory 2002 Unit Performance Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2001-10-01

    This EML Unit Performance Plan provides the key goals and performance measures for FY 2002 and continuing to FY 2003. The purpose of the Plan is to inform EML's stakeholders and customers of the Laboratory's products and services, and its accomplishments and future challenges. Also incorporated in the Unit Performance Plan is EML's Communication Plan for FY 2002.

  5. Savannah River Site's Site Specific Plan

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

  6. Sixth General Radioactive Waste Plan. Planning to the future of ENRESA; El Sexto Plan General de Residuos. La planificacion del futuro de Enresa

    Energy Technology Data Exchange (ETDEWEB)

    Espejo Hernandez, J. M.

    2006-07-01

    The Government approved last June 23''rd the Sixth General Radioactive Waste Plan that presents the activities to be carried out by ENRESA in all its field of responsibility to the year 2070. The document considers as one of the principal changes that ENRESA will be restructured to corporate public entity assigned to the Ministry of Industry, Tourism and Trade as well as the need of a Centralised Temporary Storage for the spent fuel and the high level radioactive wastes generated in Spain. Nevertheless, information is provided on the plans for the full decommissioning of the nuclear power plants to complete their operational life and also the economic and financial aspects related to the activities contemplated in the Plan. (Author) 13 refs.

  7. Diagnostic radiology in the nearest future

    International Nuclear Information System (INIS)

    Lindenbraten, L.D.

    1984-01-01

    Basic trends of diagnostic radiology (DR) development in the nearest future are formulated. Possibilities of perspective ways and means of DR studies are described. The prohlems of strategy, tactics, organization of diagnostic radiological service are considered. An attempt has been made to outline the professional image of a specialist in the DR of the future. It is shown that prediction of the DR future development is the planning stage of the present, the choice of a right way of development

  8. Comprehensive Statewide Plan for Postsecondary Education

    Science.gov (United States)

    Nebraska's Coordinating Commission for Postsecondary Education, 2016

    2016-01-01

    The constitution and statutes of Nebraska assign the Coordinating Commission for Postsecondary Education the responsibility for comprehensive planning for postsecondary education in Nebraska. The purpose of the "Comprehensive Plan for Postsecondary Education" is to provide direction for the future of postsecondary education in Nebraska.…

  9. Strategic Planning Is an Oxymoron

    Science.gov (United States)

    Bassett, Patrick F.

    2012-01-01

    The thinking on "strategic thinking" has evolved significantly over the years. In the previous century, the independent school strategy was to focus on long-range planning, blithely projecting 10 years into the future. For decades this worked well enough, but in the late 20th century, independent schools shifted to "strategic planning," with its…

  10. Overview of EAST progress and near future plan

    International Nuclear Information System (INIS)

    Gong, X.; Li, J.; Wan, B.N.; Qian, J.P.; Cao, L.

    2015-01-01

    with good confinement, concomitant with oscillating zonal flows and a high-frequency broad-band turbulence, has been observed for the first time in the pedestal of H-mode plasmas, which have significant implications for ITER operations. This paper presents some highlights of these new achievements in EAST. EAST will be in operation with 20 MW CW Heating and Current Drive powers (LHCD, ICRH, NBI and ECRH), enhanced diagnostic capabilities and full actively-cooled metal wall from 2013. It will therefore allow to access new confinement regimes and extend these regimes towards to steady state operation. The future plan of EAST in 2013 and next 3-5 years also will be presented in this paper. (authors)

  11. Using Model to Plan of Strategic Objectives

    OpenAIRE

    Terezie Bartusková; Jitka Baňařová; Zuzana Kusněřová

    2012-01-01

    Importance of strategic planning is unquestionable. However, the practical implementation of a strategic plan faces too many obstacles. The aim of the article is explained the importance of strategic planning and to find how companies in Moravian-Silesian Region deal with strategic planning, and to introduce the model, which helps to set strategic goals in financial indicators area. This model should be part of the whole process of strategic planning and can be use to predict the future value...

  12. Auditory N1 reveals planning and monitoring processes during music performance.

    Science.gov (United States)

    Mathias, Brian; Gehring, William J; Palmer, Caroline

    2017-02-01

    The current study investigated the relationship between planning processes and feedback monitoring during music performance, a complex task in which performers prepare upcoming events while monitoring their sensory outcomes. Theories of action planning in auditory-motor production tasks propose that the planning of future events co-occurs with the perception of auditory feedback. This study investigated the neural correlates of planning and feedback monitoring by manipulating the contents of auditory feedback during music performance. Pianists memorized and performed melodies at a cued tempo in a synchronization-continuation task while the EEG was recorded. During performance, auditory feedback associated with single melody tones was occasionally substituted with tones corresponding to future (next), present (current), or past (previous) melody tones. Only future-oriented altered feedback disrupted behavior: Future-oriented feedback caused pianists to slow down on the subsequent tone more than past-oriented feedback, and amplitudes of the auditory N1 potential elicited by the tone immediately following the altered feedback were larger for future-oriented than for past-oriented or noncontextual (unrelated) altered feedback; larger N1 amplitudes were associated with greater slowing following altered feedback in the future condition only. Feedback-related negativities were elicited in all altered feedback conditions. In sum, behavioral and neural evidence suggests that future-oriented feedback disrupts performance more than past-oriented feedback, consistent with planning theories that posit similarity-based interference between feedback and planning contents. Neural sensory processing of auditory feedback, reflected in the N1 ERP, may serve as a marker for temporal disruption caused by altered auditory feedback in auditory-motor production tasks. © 2016 Society for Psychophysiological Research.

  13. Linking human and natural systems in the planning process

    Science.gov (United States)

    Susan I. Stewart; Miranda H. Mockrin; Roger B. Hammer

    2012-01-01

    Planning links human and natural systems in the urban-rural interface by engaging people in consideration of the future of natural resources. We review evolving ideas about what planning entails, who it involves, and what its outcomes should be. Sense of place, collaboration, emergent planning, and other new developments in planning are discussed. Smaller plans,...

  14. ‘Our Changes’? Visions of the Future in Nairobi

    Directory of Open Access Journals (Sweden)

    Constance Smith

    2017-03-01

    Full Text Available In Kenya, the Vision 2030 masterplan is radically reimagining Nairobi as a ‘world class’ city of the future. This has generated dramatic digital imagery of satellite cities, skyscrapers and shopping malls. For tenants in rundown public housing, these glossy yet speculative visions are enticing, but also provoke anxieties of exclusion. Yet so far, little has materially manifested. This article explores the effects these future vistas produce in the present, in the gap between the urban plan and its implementation. It argues that the spectacle of official planning has generated anticipatory actions, as Nairobians’ engage with the future promised by such schemes. These actions are characterised by dissonant temporal experiences, in which local residents experience the future city as both near at hand and forever out of reach.

  15. LDRD FY 2014 Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Anita Gianotto; Dena Tomchak

    2013-08-01

    As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.

  16. Czech interim spent fuel storage facility: operation experience, inspections and future plans

    International Nuclear Information System (INIS)

    Fajman, V.; Bartak, L.; Coufal, J.; Brzobohaty, K.; Kuba, S.

    1999-01-01

    The paper describes the situation in the spent fuel management in the Czech Republic. The interim Spent Fuel Storage Facility (ISFSF) at Dukovany, which was commissioned in January 1997 and is using dual transport and storage CASTOR - 440/84 casks, is briefly described. The authors deal with their experience in operating and inspecting the ISFSF Dukovany. The structure of the basic safety document 'Limits and Conditions of Normal Operation' is also mentioned, including the experience of the performance. The inspection activities focused on permanent checking of the leak tightness of the CASTOR 440/84 casks, the maximum cask temperature and inspections monitoring both the neutron and gamma dose rate as well as the surface contamination. The results of the inspections are mentioned in the presentation as well. The operator's experience with re-opening partly loaded and already dried CASTOR-440/84 cask, after its transport from NPP Jaslovske Bohunice to the NPP Dukovany is also described. The paper introduces briefly the concept of future spent fuel storage both from the NPP Dukovany and the NPP Temelin, as prepared by the CEZ. The preparatory work for the Central Interim Spent Nuclear Fuel Storage Facility (CISFSF) in the Czech Republic and the information concerning the planned storage technology for this facility is discussed in the paper as well. The authors describe the site selection process and the preparatory steps concerning new spent fuel facility construction including the Environmental Impact Assessment studies. (author)

  17. Radiation therapy treatment planning: CT, MR imaging and three-dimensional planning

    International Nuclear Information System (INIS)

    Lichter, A.S.

    1987-01-01

    The accuracy and sophistication of radiation therapy treatment planning have increased rapidly in the last decade. Currently, CT-based treatment planning is standard throughout the country. Care must be taken when CT is used for treatment planning because of clear differences between diagnostic scans and scans intended for therapeutic management. The use of CT in radiation therapy planning is discussed and illustrated. MR imaging adds another dimension to treatment planning. The ability to use MR imaging directly in treatment planning involves an additional complex set of capabilities from a treatment planning system. The ability to unwarp the geometrically distorted MR image is a first step. Three-dimensional dose calculations are important to display the dose on sagittal and acoronal sections. The ability to integrate the MR and CT images into a unified radiographic image is critical. CT and MR images are two-dimensional representations of a three-dimensional problem. Through sophisticated computer graphics techniques, radiation therapists are now able to integrate a three-dimensional image of the patient into the treatment planning process. This allows the use of noncoplanar treatment plans and a detailed analysis of tumor and normal tissue anatomy; it is the first step toward a fully conformational treatment planning system. These concepts are illustrated and future research goals outlined

  18. Views on planning and expectations of SEA: the case of transport planning

    International Nuclear Information System (INIS)

    Hilden, Mikael; Furman, Eeva; Kaljonen, Minna

    2004-01-01

    This paper examines the effectiveness of strategic environmental assessment (SEA) in transport planning in the light of different views of planning: synoptic optimising planning, communicative planning and planning as a social struggle. The analysis uses empirical materials from 17 case studies collected by survey from Member Countries of the United Nation's Economic Commission for Europe (UN/ECE) and further processed in a practitioners' workshop, and also a detailed case study carried out in Finland. The case studies and the workshop identified a set of necessary conditions and facilitating factors that contribute to the effectiveness of strategic environmental assessments in transport planning. Our findings suggest that transport planning can often best be characterised as a social struggle over problem definitions and future choices. Thus, the effectiveness of SEA will depend on how well the assessment fits into the planning context and on its actual contribution to debates on problem definitions. Specific procedural steps may improve the effectiveness but explicit requirements to recognise SEA in decision making are likely to be a key condition

  19. Mapping the receptivity of malaria risk to plan the future of control in Somalia

    Science.gov (United States)

    Alegana, Victor Adagi; Patil, Anand Prabhakar; Moloney, Grainne; Borle, Mohammed; Yusuf, Fahmi; Amran, Jamal; Snow, Robert William

    2012-01-01

    Objectives To measure the receptive risks of malaria in Somalia and compare decisions on intervention scale-up based on this map and the more widely used contemporary risk maps. Design Cross-sectional community Plasmodium falciparum parasite rate (PfPR) data for the period 2007–2010 corrected to a standard age range of 2 to Somalia. Participants Randomly sampled individuals of all ages. Main outcome measure Cartographic descriptions of malaria receptivity and contemporary risks in Somalia at the district level. Results The contemporary annual PfPR2–10 map estimated that all districts (n=74) and population (n=8.4 million) in Somalia were under hypoendemic transmission (≤10% PfPR2–10). Of these, 23% of the districts, home to 13% of the population, were under transmission of 10%–50% PfPR2–10) and the rest as hypoendemic. Conclusion Compared with maps of receptive risks, contemporary maps of transmission mask disparities of malaria risk necessary to prioritise and sustain future control. As malaria risk declines across Africa, efforts must be invested in measuring receptivity for efficient control planning. PMID:22855625

  20. Report on Workshop "Planning of Future Science in the Polar Ocean Study with Cooperation among Study Groups"

    Directory of Open Access Journals (Sweden)

    Mitsuo Fukuchi

    2001-03-01

    Full Text Available A workshop on "Planning of Future Science in the Polar Ocean Study with Cooperation among Study Groups" was held on November 1,2000,at the National Institute of Polar Research with 21 participants. In this workshop, a plan to charter a research vessel other than "Shirase" was introduced and a science plan using the chartered research vessel by 43rd Japanese Antarctic Research Expedition was discussed. This study is going to be conducted in the sea ice area around 140-150°E in mid-summer (February 2002, when biological production becomes active in the Antarctic Ocean. Oceanographic observations using "Shirase" are difficult to conduct in this season since she supports a wide range of summer operations around Syowa Station. The relationships between biological production and greenhouse effect gas production and the vertical transport of organic materials from the surface to deep ocean will be the focus of this study. At this stage, one deputy leader and three members of JARE, and 25-26 other scientists including graduate students and foreign scientists, will participate in the field observations using the chartered vessel. The members of JARE will conduct a project science program of the VI Phase of JARE, while the other participants will do part of the science program "Antarctic Ocean in Earth System". Since further observations for several years after the summer of 2002 will be required to understand the role of the Antarctic Ocean in global climate change, we have applied for a Grant-in-Aid for Scientific Research for the next project, which will start from 2001,to the Ministry of Education, Science, Sports and Culture of Japan. The proposal was discussed in detail in this workshop.

  1. Developing a planning model to estimate future cash flows.

    Science.gov (United States)

    Barenbaum, L; Monahan, T F

    1988-03-01

    Financial managers are discovering that net income and other traditional measures of cash flow may not provide them with the flexibility needed for comprehensive internal planning and control. By using a discretionary cash flow model, financial managers have a forecasting tool that can help them measure anticipated cash flows, and make better decisions concerning financing alternatives, capital expansion, and performance appraisal.

  2. Nurse manager succession planning: synthesis of the evidence.

    Science.gov (United States)

    Titzer, Jennifer; Phillips, Tracy; Tooley, Stephanie; Hall, Norma; Shirey, Maria

    2013-10-01

    The literature supporting nurse manager succession planning is reviewed and synthesised to discover best practice for identifying and developing future nurse managers. Healthcare succession planning practices are lacking. Nurse managers are historically selected based on clinical skills and lack formal leadership preparation. A systematic literature search appraises and summarises the current literature supporting nurse manager succession planning. Multiple reviewers were used to increase the reliability and validity of article selection and analysis. New nurse managers require months to adapt to their positions. Deliberate nurse manager succession planning should be integrated in the organisation's strategic plan and provide a proactive method for identifying and developing potential leaders. Organisations that identify and develop internal human capital can improve role transition, reduce nurse manager turnover rates and decrease replacement costs. Despite the clear benefits of succession planning, studies show that resource allocation for proactive, deliberate development of current and future nurse leaders is lacking. Additionally, systematic evaluation of succession planning is limited. Deliberate succession planning efforts and appropriate resource allocation require strategic planning and evaluation methods. Detailed evaluation methods demonstrating a positive return on investment utilising a cost-benefit analysis and empirical outcomes are necessary. © 2013 John Wiley & Sons Ltd.

  3. 77 FR 29317 - Fiscal Year 2011 Draft Work Plan

    Science.gov (United States)

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2011 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... develop proposed work plans for future spending and that the annual Work Plan be published in the Federal... Work Plan for Federal Fiscal Year 2011. DATES: Comments and related material to be received by June 10...

  4. 77 FR 29317 - Fiscal Year 2012 Draft Work Plan

    Science.gov (United States)

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2012 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... Commission develop proposed work plans for future spending and that the annual Work Plan be published in the... Commission Draft Work Plan for Federal Fiscal Year 2012. DATES: Comments and related material to be received...

  5. Institutional plan. FY 1998--2003

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    This Institutional Plan for Argonne National Laboratory contains central elements of Argonne`s strategic plan. Chapter II of this document discusses the Laboratory`s mission and core competencies. Chapter III presents the Science and Technology Strategic Plan, which summarizes key features of the external environment, presents Argonne`s vision, and describes how the Laboratory`s strategic goals and objectives map onto and support DOE`s four business lines. The balance of the chapter comprises the science and technology area plans, organized by the four DOE business lines. Chapter IV describes the Laboratory`s ten major initiatives, which cover a broad spectrum of science and technology. Our proposal for an Exotic Beam Facility aims at, among other things, increased understanding of the processes of nuclear synthesis during and shortly after the Big Bang. Our Advanced Transportation Technology initiative involves working with US industry to develop cost-effective technologies to improve the fuel efficiency and reduce the emissions of transportation systems. The Laboratory`s plans for the future depend significantly on the success of its major initiatives. Chapter V presents our Operations and Infrastructure Strategic Plan. The main body of the chapter comprises strategic plans for human resources; environmental protection, safety, and health; site and facilities; and information management. The chapter concludes with a discussion of the business and management practices that Argonne is adopting to improve the quality and cost-effectiveness of its operations. The structure and content of this document depart from those of the Institutional Plan in previous years. Emphasis here is on directions for the future; coverage of ongoing activities is less detailed. We hope that this streamlined plan is more direct and accessible.

  6. A Land-use Approach for Capturing Future Trip Generating Poles

    Directory of Open Access Journals (Sweden)

    Iraklis Stamos

    2015-12-01

    Full Text Available Changes in the usage of a particular urban or regional area have immediate effects on transportation, such as the development of a new multimodal terminal within a city, or the creation of a business park in its outskirts. Thus far, this correlation has been under-researched at a national level in Greece. As a result, its effects on trip generation and passenger flows has been underestimated at the planning level, leading to the implementation of projects that are neither viable nor sustainable. This paper proposes that land use changes ought to be considered in tandem with transport-related changes at the planning stage. To this effect, we present a three-step methodology for an integrated approach to capturing future trip generation: the identification of future trip-generating poles within the study area; the development of scenarios related to the probability of these changes occurring and their potential magnitude; an estimation of future trends in passenger flows. The methodology is applied to the Metropolitan area of Thessaloniki, Greece. Using data obtained from development plans, national statistical services and research projects’ and studies’ findings, we estimate future trip-generation subsequent to land use change. Data is processed and evaluated by a local experts’ group, representing various key-disciplines of the area’s planning stakeholders.

  7. The impact of adolescent females' assessments of parenthood and employment on plans for the future.

    Science.gov (United States)

    Leslie, L A

    1986-02-01

    This study explores adolescent females' assessments of the rewards and costs of employment and parenthood, and the impact of these assessments on their plans for organizing their adult lives. 549 young women enrolled in the 11th and 12 grades at public schools in New York City completed questionnaires addressing their future work and fertility plans, characteristics of their present family life, and their assessments of how rewarding and costly the roles of employee and parent would be to them. Results suggest that daughters of homemakers and daughters of employed women differ in their assessment of each role, and take different factors into consideration when making these assessments. In evaluating work, daughters whose mothers are employed were likely to depend on their mothers' experiences for guidance. On the other hand, daughters whose mothers are homemakers have to go through a more elaborate process of deduction. They appear to assess whether their mothers are happy where they are now and then project whether another role would be more satisfying. These young women also tend to incorporate the opinion of the father more than do daughters of employed mothers. In evaluating the impact of children, the young woman's relation with her own mother is a critical factor affecting both group' assessments of the costs of children as well as the employed group's assessments of the rewards of children. Finally, the limitations of the sample should be kept in mind when discussing the results. Though the sample was large numerically, the overall response rate was low. In addition, the sample consisted of a large number of Catholic respondents.

  8. SU-D-BRD-02: A Web-Based Image Processing and Plan Evaluation Platform (WIPPEP) for Future Cloud-Based Radiotherapy

    International Nuclear Information System (INIS)

    Chai, X; Liu, L; Xing, L

    2014-01-01

    Purpose: Visualization and processing of medical images and radiation treatment plan evaluation have traditionally been constrained to local workstations with limited computation power and ability of data sharing and software update. We present a web-based image processing and planning evaluation platform (WIPPEP) for radiotherapy applications with high efficiency, ubiquitous web access, and real-time data sharing. Methods: This software platform consists of three parts: web server, image server and computation server. Each independent server communicates with each other through HTTP requests. The web server is the key component that provides visualizations and user interface through front-end web browsers and relay information to the backend to process user requests. The image server serves as a PACS system. The computation server performs the actual image processing and dose calculation. The web server backend is developed using Java Servlets and the frontend is developed using HTML5, Javascript, and jQuery. The image server is based on open source DCME4CHEE PACS system. The computation server can be written in any programming language as long as it can send/receive HTTP requests. Our computation server was implemented in Delphi, Python and PHP, which can process data directly or via a C++ program DLL. Results: This software platform is running on a 32-core CPU server virtually hosting the web server, image server, and computation servers separately. Users can visit our internal website with Chrome browser, select a specific patient, visualize image and RT structures belonging to this patient and perform image segmentation running Delphi computation server and Monte Carlo dose calculation on Python or PHP computation server. Conclusion: We have developed a webbased image processing and plan evaluation platform prototype for radiotherapy. This system has clearly demonstrated the feasibility of performing image processing and plan evaluation platform through a web

  9. SU-D-BRD-02: A Web-Based Image Processing and Plan Evaluation Platform (WIPPEP) for Future Cloud-Based Radiotherapy

    Energy Technology Data Exchange (ETDEWEB)

    Chai, X; Liu, L; Xing, L [Stanford UniversitySchool of Medicine, Stanford, CA (United States)

    2014-06-01

    Purpose: Visualization and processing of medical images and radiation treatment plan evaluation have traditionally been constrained to local workstations with limited computation power and ability of data sharing and software update. We present a web-based image processing and planning evaluation platform (WIPPEP) for radiotherapy applications with high efficiency, ubiquitous web access, and real-time data sharing. Methods: This software platform consists of three parts: web server, image server and computation server. Each independent server communicates with each other through HTTP requests. The web server is the key component that provides visualizations and user interface through front-end web browsers and relay information to the backend to process user requests. The image server serves as a PACS system. The computation server performs the actual image processing and dose calculation. The web server backend is developed using Java Servlets and the frontend is developed using HTML5, Javascript, and jQuery. The image server is based on open source DCME4CHEE PACS system. The computation server can be written in any programming language as long as it can send/receive HTTP requests. Our computation server was implemented in Delphi, Python and PHP, which can process data directly or via a C++ program DLL. Results: This software platform is running on a 32-core CPU server virtually hosting the web server, image server, and computation servers separately. Users can visit our internal website with Chrome browser, select a specific patient, visualize image and RT structures belonging to this patient and perform image segmentation running Delphi computation server and Monte Carlo dose calculation on Python or PHP computation server. Conclusion: We have developed a webbased image processing and plan evaluation platform prototype for radiotherapy. This system has clearly demonstrated the feasibility of performing image processing and plan evaluation platform through a web

  10. 77 FR 37614 - Tariffs (Other Than Tariff Review Plan); Connect America Fund; A National Broadband Plan for Our...

    Science.gov (United States)

    2012-06-22

    ... (Other Than Tariff Review Plan); Connect America Fund; A National Broadband Plan for Our Future; Establishing Just and Reasonable Rates for Local Exchange Carriers; High-Cost Universal Service Support AGENCY... with the Commission's Connect America Fund, Report and Order (Order). The Commission submitted...

  11. Risso's dolphins plan foraging dives.

    Science.gov (United States)

    Arranz, Patricia; Benoit-Bird, Kelly J; Southall, Brandon L; Calambokidis, John; Friedlaender, Ari S; Tyack, Peter L

    2018-02-28

    Humans remember the past and use that information to plan future actions. Lab experiments that test memory for the location of food show that animals have a similar capability to act in anticipation of future needs, but less work has been done on animals foraging in the wild. We hypothesized that planning abilities are critical and common in breath-hold divers who adjust each dive to forage on prey varying in quality, location and predictability within constraints of limited oxygen availability. We equipped Risso's dolphins with sound-and-motion recording tags to reveal where they focus their attention through their externally observable echolocation and how they fine tune search strategies in response to expected and observed prey distribution. The information from the dolphins was integrated with synoptic prey data obtained from echosounders on an underwater vehicle. At the start of the dives, whales adjusted their echolocation inspection ranges in ways that suggest planning to forage at a particular depth. Once entering a productive prey layer, dolphins reduced their search range comparable to the scale of patches within the layer, suggesting that they were using echolocation to select prey within the patch. On ascent, their search range increased, indicating that they decided to stop foraging within that layer and started searching for prey in shallower layers. Information about prey, learned throughout the dive, was used to plan foraging in the next dive. Our results demonstrate that planning for future dives is modulated by spatial memory derived from multi-modal prey sampling (echoic, visual and capture) during earlier dives. © 2018. Published by The Company of Biologists Ltd.

  12. Collaborative Strategic Planning in Higher Education

    Science.gov (United States)

    Sanaghan, Patrick

    2009-01-01

    This book outlines a simple, five-phase collaborative approach to strategic planning that has worked effectively on many campuses. Specifically, Collaborative Strategic Planning (CSP) refers to the disciplined and thoughtful process of meaningfully engaging relevant stakeholders in creating a shared future vision and goals for their institution.…

  13. Future Practice Plans of Orthodontic Postgraduate Residents in India

    Directory of Open Access Journals (Sweden)

    Chanjyot Singh Walia

    2014-01-01

    Conclusion: Indian Orthodontic programs would not find a shortage of full-time academicians in the future. Residents favor 35- to 36-month programs with a research-based component. Newer techniques, e.g. Digital Imaging, TAD, SLB are here to stay.

  14. Tools of the Future: How Decision Tree Analysis Will Impact Mission Planning

    Science.gov (United States)

    Otterstatter, Matthew R.

    2005-01-01

    The universe is infinitely complex; however, the human mind has a finite capacity. The multitude of possible variables, metrics, and procedures in mission planning are far too many to address exhaustively. This is unfortunate because, in general, considering more possibilities leads to more accurate and more powerful results. To compensate, we can get more insightful results by employing our greatest tool, the computer. The power of the computer will be utilized through a technology that considers every possibility, decision tree analysis. Although decision trees have been used in many other fields, this is innovative for space mission planning. Because this is a new strategy, no existing software is able to completely accommodate all of the requirements. This was determined through extensive research and testing of current technologies. It was necessary to create original software, for which a short-term model was finished this summer. The model was built into Microsoft Excel to take advantage of the familiar graphical interface for user input, computation, and viewing output. Macros were written to automate the process of tree construction, optimization, and presentation. The results are useful and promising. If this tool is successfully implemented in mission planning, our reliance on old-fashioned heuristics, an error-prone shortcut for handling complexity, will be reduced. The computer algorithms involved in decision trees will revolutionize mission planning. The planning will be faster and smarter, leading to optimized missions with the potential for more valuable data.

  15. Problems of future energy market planning and optimization

    International Nuclear Information System (INIS)

    Lelek, V.; Jaluvka, D.

    2007-01-01

    Probable development of energy market is described in the article and special attention is devoted to the nuclear energy, which not only consume, but also produce raw material and how to proceed to avoid crises in supply. Problems of future energy supply of heat, liquid fuel, electricity are described. Expected effect will be jump in prices or regulated supply to equalize supply and use. It can completely change our standard consideration of profit

  16. 21 CFR 25.10 - Policies and NEPA planning.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Policies and NEPA planning. 25.10 Section 25.10... ENVIRONMENTAL IMPACT CONSIDERATIONS General Provisions § 25.10 Policies and NEPA planning. (a) All FDA's... future generations. (b) Assessment of environmental factors continues throughout planning and is...

  17. The National Diabetes Education Program at 20 Years: Lessons Learned and Plans for the Future.

    Science.gov (United States)

    Siminerio, Linda M; Albright, Ann; Fradkin, Judith; Gallivan, Joanne; McDivitt, Jude; Rodríguez, Betsy; Tuncer, Diane; Wong, Faye

    2018-02-01

    The National Diabetes Education Program (NDEP) was established to translate findings from diabetes research studies into clinical and public health practice. Over 20 years, NDEP has built a program with partnership engagement that includes science-based resources for multiple population and stakeholder audiences. Throughout its history, NDEP has developed strategies and messages based on communication research and relied on established behavior change models from health education, communication, and social marketing. The program's success in continuing to engage diverse partners after 20 years has led to time-proven and high-quality resources that have been sustained. Today, NDEP maintains a national repository of diabetes education tools and resources that are high quality, science- and audience-based, culturally and linguistically appropriate, and available free of charge to a wide variety of audiences. This review looks back and describes NDEP's evolution in transforming and communicating diabetes management and type 2 diabetes prevention strategies through partnerships, campaigns, educational resources, and tools and identifies future opportunities and plans. © 2018 by the American Diabetes Association.

  18. Transformational Assessment: A Simplified Model of Strategic Planning

    Science.gov (United States)

    Bardwell, Rebecca

    2008-01-01

    Strategic planning is a way to evaluate a present situation and set a course for the future. While there is no dearth of literature on Strategic Planning, there appears to be reluctance on the part of K-12 educators to engage in strategic planning. Besides the cynicism about change, another roadblock to strategic planning is the time it takes.…

  19. Designing the Future

    Directory of Open Access Journals (Sweden)

    Friso de Zeeuw

    2010-04-01

    Full Text Available The Netherlands has a tradition in public spatial planning and design. In the past 20 years, we have seen an increasing role for the market in this field, and more recently, growing attention for sustainability. Sustainability has become an economic factor. Not only at the building level, but also on the level of large-scale area development projects. More and more local governments have high ambitions for sustainable development. Increasingly, during project development, buildings are developed on a sustainable basis. Most of the time, the focus in this approach is on energy. However, sustainability also comprises social aspects. Energy measures have a direct relation to an economic factor such as investment costs, and payback time can be calculated. The economic aspects of social sustainability are more complex. Therefore, for all sustainability development projects, especially in large-scale projects planned over a longer period, it is necessary to make presumptions, which are less reliable as the planning period is extended. For future larger-scale developments, experience in the Netherlands points to two design approaches: ‘backcasting’, or using a growth model (or a combination of these two. The power of design is the ability to imagine possible scenarios for the future. The layer approach helps to integrate sustainability into public spatial planning. And more specifically, Urban Design Management (UDM supports an integrative and collaborative approach also on the operational level of a project in which public and market partners work together. This article outlines how design, based on these approaches, can contribute to sustainable development based on the ‘new playing field’, where spatial problems should be solved in networks. Dutch projects in Almere (Benoordenhout and Rijswijk are used to illustrate this approach.

  20. Evolution of Requirements and Assumptions for Future Exploration Missions

    Science.gov (United States)

    Anderson, Molly; Sargusingh, Miriam; Perry, Jay

    2017-01-01

    NASA programs are maturing technologies, systems, and architectures to enabling future exploration missions. To increase fidelity as technologies mature, developers must make assumptions that represent the requirements of a future program. Multiple efforts have begun to define these requirements, including team internal assumptions, planning system integration for early demonstrations, and discussions between international partners planning future collaborations. For many detailed life support system requirements, existing NASA documents set limits of acceptable values, but a future vehicle may be constrained in other ways, and select a limited range of conditions. Other requirements are effectively set by interfaces or operations, and may be different for the same technology depending on whether the hard-ware is a demonstration system on the International Space Station, or a critical component of a future vehicle. This paper highlights key assumptions representing potential life support requirements and explanations of the driving scenarios, constraints, or other issues that drive them.

  1. A Human Resource Development Action Plan for the Radiography Program Sponsored by Lincoln Land/St. John's Based on a View of the Radiographer of the Future.

    Science.gov (United States)

    Dowd, Steven B.

    The purpose of a practicum was to develop an effective and valid human resource development plan based on a view of the practitioner of the future. The targeted program was one in radiography (radiologic technology) co-sponsored by Lincoln Land Community College and St. John's Hospital (Illinois). A review of the literature was used to establish a…

  2. Personal strategic planning

    Directory of Open Access Journals (Sweden)

    Rolando Juan Soliz Estrada

    2011-01-01

    Full Text Available Reconciling personal skills with the demands of a globalized and competitive market has become a pre-requisite for professionals aspiring for success in their careers. The quest for personal fulfillment has encouraged people to search for tools which develop their talents and balance their efforts, in order to achieve a better, happier and healthier life. As an option, planning, which historically was restricted to being an organizational tool, today has also come to be used by individuals who desire personal success. In this way, the objective of this article is to develop a model of Personal Strategic Planning which takes into account the various operation areas and human performance. The proposed model is divided into: Individual Planning, Professional Planning, Family Planning, Personal Business Planning and Political Participation, Social and Religious/Spiritual Planning and their respective fields. In order to analyse and validate the model, exploratory research of a qualitative nature was used through primary and secondary data sources. From the results obtained by the model, it is possible to consider their importance to future research, once the studied areas can be developed in subsequent works.

  3. Environmental futures research: experiences, approaches, and opportunities

    Science.gov (United States)

    David N., comp. Bengston

    2012-01-01

    These papers, presented in a special session at the International Symposium on Society and Resource Management in June 2011, explore the transdisciplinary field of futures research and its application to long-range environmental analysis, planning, and policy. Futures research began in the post-World War II era and has emerged as a mature research field. Although the...

  4. Physics at Future Colliders

    CERN Document Server

    Ellis, John R.

    1999-01-01

    After a brief review of the Big Issues in particle physics, we discuss the contributions to resolving that could be made by various planned and proposed future colliders. These include future runs of LEP and the Fermilab Tevatron collider, B factories, RHIC, the LHC, a linear electron-positron collider, an electron-proton collider in the LEP/LHC tunnel, a muon collider and a future larger hadron collider (FLHC). The Higgs boson and supersymmetry are used as benchmarks for assessing their capabilities. The LHC has great capacities for precision measurements as well as exploration, but also shortcomings where the complementary strengths of a linear electron-positron collider would be invaluable. It is not too soon to study seriously possible subsequent colliders.

  5. Plan for the future of neutron research on condensed matter: an Argonne National Laboratory report prepared in response to the Report of the Review Panel on Neutron Scattering

    International Nuclear Information System (INIS)

    1981-01-01

    The Review Panel on Neutron Scattering has recommended an expanded budget to allow systematic development of the field. An alternative plan for the future of neutron research on condensed matter is presented here, in case it is not possible to fund the expanded budget. This plan leads, in a rational and logical way, to a world-class neutron source that will ensure the vitality of the field and exploit the many benefits that state-of-the-art neutron facilities can bring to programs in the materials and biological sciences. 2 tables

  6. Plant life extension program for Indian PHWR power plants - Actual experience and future plans

    International Nuclear Information System (INIS)

    Sharma, M.B.; Ghoshal, B.; Shirolkar, K.M.; Ahmad, S.N.

    2002-01-01

    emergency core cooling system, inspection and replacement of heat exchangers and steam generators, and enhancement of emergency power supplies. It needs to be recognised that RAPS was built in the 1970s. Thus considerable upgrades have been done to meet latest safety requirements. Hence jobs like segregation of safety related power supplies and cables to meet more stringently groups and channel philosophy, installation of fire barriers and modernisation of fire detection system have also been carried out. The paper discusses the tools developed including remote tooling, mock-ups done and special training given to ensure that the work is done safely in the shortest possible time and with the lowest man-rem consumption. For RAPS-2 results are compared with the original planned values and it will be noticed that considerable savings were achieved in man-rem, monetary expenditure and time taken for the job. One significant aspect of the coolant channel replacement and upgradation work has been that all the work was done within the department of atomic energy. This included theoretical work, experimental studies, actual execution of the jobs and inspection and testing. The role of industry has been limited to supply of equipment. For MAPS outside agencies have been invited to participate in actual execution of the jobs at site. This has considerably changed the method of planning and execution of the jobs. For future reactors greater role of industry in development and actual site work is envisaged. The paper discusses the options being considered by NPCIL. Plant life extension and upgradation of older plants throws up several issues related to safety regulatory criteria that the upgraded plant should meet. This paper discusses the methodology formed by the utility and regulatory authority to meet agreed criteria for safety. Also discussed are special areas of concern like configuration control, documentation, training and re-qualification of operations staff. This paper

  7. Present status and future plans at INS 1.3 GeV electron synchrotron

    International Nuclear Information System (INIS)

    Yoshida, K.

    1984-01-01

    The 1.3 GeV electron synchrotron at the Institute for Nuclear Study, University of Tokyo, was completed in 1961, and it was the first accelerator in Japan that was able to be used for the study on particle physics. The brief chronicle is shown. One of the purposes to construct the electron synchrotron was to train accelerator physicists for the next big project of building a high energy proton synchrotron. This project led to the foundation of the National Laboratory for High Energy Physics, and the Photon Factory was completed in 1982 there. The electron synchrotron has been continuously operated for 22 years. Meanwhile, the major components such as the injector linac, the vacuum system and the of acceleration system were renewed. By these improvement, the beam intensity and stability of the synchrotron were much improved. The circulating current is now 160 mA, and the number of accelerated electrons is 2.5 x 10 12 /sec. These are the highest values in the world. The parameters of the present synchrotron and the operational status are shown. There are five beam channels, that is, bremsstrahlung channel, tagged photon beam, fast extracted electron beam, synchrotron light channel and detector test channel. The recent activities with the INS electron synchrotron and the future plans are summarized. (Kako, I.)

  8. Risk assessment future cash flows

    OpenAIRE

    Chachina H. G.

    2012-01-01

    This article is about risk assessment in planning future cash flows. Discount rate in DCF-model must include four factors: risk cash flow, inflation, value of investments, turnover assets. This has an influence net present value cash flow and make his incomparable.

  9. The School of the Future.

    Science.gov (United States)

    Bete, Tim, Ed.

    1998-01-01

    Describes The Walt Disney Company's K-12 school of the future design that was developed from combining the hands-on knowledge of a school district and the curriculum expertise of a teaching university. Several illustrations and a basic floor plan are provided. (GR)

  10. Longevity for future Europeans

    DEFF Research Database (Denmark)

    Christensen, K.

    2015-01-01

    of Success", i.e., an increasing proportion of the population is living to the highest ages in better health than previous generations. The planning of and policy development for the future care of the oldest-old will be highly dependent on whether one or both genders are experiencing the "Failure of Success...

  11. ESA remote-sensing programme - Present activities and future plans

    Energy Technology Data Exchange (ETDEWEB)

    Plevin, J [ESA, Directorate of Planning and Future Programmes, Paris, France; Pryke, I [ESA, Directorate of Applications Programmes, Toulouse, France

    1979-02-01

    The present activities and future missions of the ESA program of spaceborne remote sensing of earth resources and environment are discussed. Program objectives have been determined to be the satisfaction of European regional needs by agricultural, land use, water resources, coastal and polar surveys, and meeting the requirements of developing nations in the areas of agricultural production, mineral exploration and disaster warning and assessment. The Earthnet system of data processing centers presently is used for the distribution of remote sensing data acquired by NASA satellites. Remote sensing experiments to be flown aboard Spacelab are the Metric Camera, to test high resolution mapping capabilities of a large format camera, and the Microwave Remote-Sensing Experiment, which operates as a two-frequency scatterometer, a synthetic aperture radar and a passive microwave radiometer. Studies carried out on the definition of future remote sensing satellite systems are described, including studies of system concepts for land applications and coastal monitoring satellites.

  12. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Hathaway, H.B.; Daly, K.S.; Rinne, C.A.; Seiler, S.W.

    1992-05-01

    The Hanford Site Development Plan (HSDP) provides an overview of land use, infrastructure, and facility requirements to support US Department of Energy (DOE) programs at the Hanford Site. The HSDP's primary purpose is to inform senior managers and interested parties of development activities and issues that require a commitment of resources to support the Hanford Site. The HSDP provides a land use plan for the Hanford Site and presents a picture of what is currently known and anticipated in accordance with DOE Order 4320.1B. Site Development Planning. The HSDP wig be updated annually as future decisions further shape the mission and overall site development process. Further details about Hanford Site development are defined in individual area development plans

  13. Advanced Education and Technology Business Plan, 2007-10

    Science.gov (United States)

    Alberta Enterprise and Advanced Education, 2007

    2007-01-01

    The Government of Alberta Strategic Business Plan addresses significant opportunities and challenges facing Alberta over the next three years and positions Alberta to make the most of its economic, social and natural advantages. It is a plan to strategically manage growth and plan for a sustainable and secure future. Advanced Education and…

  14. Renewable Electricity Futures Study. Volume 4: Bulk Electric Power Systems. Operations and Transmission Planning

    Energy Technology Data Exchange (ETDEWEB)

    Milligan, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ela, Erik [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hein, Jeff [National Renewable Energy Lab. (NREL), Golden, CO (United States); Schneider, Thomas [National Renewable Energy Lab. (NREL), Golden, CO (United States); Brinkman, Gregory [National Renewable Energy Lab. (NREL), Golden, CO (United States); Denholm, Paul [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2012-06-15

    The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a future through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%–90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT). Learn more at the RE Futures website. http://www.nrel.gov/analysis/re_futures/

  15. Optimal planning of integrated multi-energy systems

    DEFF Research Database (Denmark)

    van Beuzekom, I.; Gibescu, M.; Pinson, Pierre

    2017-01-01

    In this paper, a mathematical approach for the optimal planning of integrated energy systems is proposed. In order to address the challenges of future, RES-dominated energy systems, the model deliberates between the expansion of traditional energy infrastructures, the integration...... and sustainability goals for 2030 and 2045. Optimal green- and brownfield designs for a district's future integrated energy system are compared using a one-step, as well as a two-step planning approach. As expected, the greenfield designs are more cost efficient, as their results are not constrained by the existing...

  16. 77 FR 35410 - Fogarty International Center 2013 Strategic Plan

    Science.gov (United States)

    2012-06-13

    ... of this strategic planning process is to identify current and future needs and directions for global... 2013 Strategic Plan SUMMARY: The Fogarty International Center (FIC), National Institutes of Health (NIH) is updating its strategic plan. To anticipate and set priorities for global health research and...

  17. Employer-sponsored pension plans

    Directory of Open Access Journals (Sweden)

    Rakonjac-Antić Tatjana N.

    2004-01-01

    Full Text Available Apart from pension plans within social insurance, in developed pension systems there are also available to individuals schemes which may to a large extent ensure a significant part of their total pension. Among them are the following: employer-sponsored pension plans or individual pension plans. The most widely used employer-sponsored pension plan in the USA is 401(k, in which both the employer and the employee contribute to the financing of the pension. These contributions as well as the return to their investment have a preferential tax treatment, i.e. do not enter a tax base. The funds are taxed only when drawn from the account in the form of a pension. This paper aims to present the functioning of 401(k pension plan as the most widely used employer sponsored pension plan in the USA, which is likely, in a modified form, to have an important place within our future reformed pension insurance system.

  18. Succession planning : phase II.

    Science.gov (United States)

    2008-06-01

    Succession planning is an organizational investment in the future. Institutional : knowledge is a critical ingredient in the culture of an organization, and its intangible : value becomes significant when an organization is faced with the need to pas...

  19. Implications of Model Structure and Detail for Utility Planning: Scenario Case Studies Using the Resource Planning Model

    Energy Technology Data Exchange (ETDEWEB)

    Mai, Trieu [National Renewable Energy Lab. (NREL), Golden, CO (United States); Barrows, Clayton [National Renewable Energy Lab. (NREL), Golden, CO (United States); Lopez, Anthony [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hale, Elaine [National Renewable Energy Lab. (NREL), Golden, CO (United States); Dyson, Mark [National Renewable Energy Lab. (NREL), Golden, CO (United States); Eurek, Kelly [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-04-01

    In this report, we analyze the impacts of model configuration and detail in capacity expansion models, computational tools used by utility planners looking to find the least cost option for planning the system and by researchers or policy makers attempting to understand the effects of various policy implementations. The present analysis focuses on the importance of model configurations — particularly those related to capacity credit, dispatch modeling, and transmission modeling — to the construction of scenario futures. Our analysis is primarily directed toward advanced tools used for utility planning and is focused on those impacts that are most relevant to decisions with respect to future renewable capacity deployment. To serve this purpose, we develop and employ the NREL Resource Planning Model to conduct a case study analysis that explores 12 separate capacity expansion scenarios of the Western Interconnection through 2030.

  20. The Open Format and Citizen Participation in Transportation Planning

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    1984-01-01

    Recent developments in transportation planning and policy indicate that citizen participation and openness may receive less emphasis in the future in favor of more closed methods of decision making and control. Have the merits and drawbacks of citizen participation and openness changed significan......Recent developments in transportation planning and policy indicate that citizen participation and openness may receive less emphasis in the future in favor of more closed methods of decision making and control. Have the merits and drawbacks of citizen participation and openness changed...... with the trend for considering social, environmental, and ethical issues in transportation planning and policy....

  1. Strategic planning in hospitals in two Australian states: an exploratory study of its practice using planning documentation.

    Science.gov (United States)

    Jayasuriya, R; Sim, A B

    1998-01-01

    Hospitals are under pressure to respond to new challenges and competition. Many hospitals have used strategic planning to respond to these environmental changes. This exploratory study examines the extent of strategic planning in hospitals in two Australian States, New South Wales and Victoria, using a sample survey. Based on planning documentation, the study indicated that 47% of the hospitals surveyed did not have a strategic or business plan. A significant difference was found in the comprehensiveness of the plans between the two States. Plans from Victorian hospitals had more documented evidence of external/internal analysis, competitor orientation and customer orientation compared with plans from New South Wales hospitals. The paper discusses the limitations of the study and directions for future research.

  2. Future climate. Engineering solutions

    Energy Technology Data Exchange (ETDEWEB)

    Ferdinand, J.F.; Hagedorn-Rasmussen, P.; Fonnesbech, B.

    2009-09-15

    Future Climate Engineering Solutions - Joint Report is the common output and a documentation of more than 1 year's effort by 13 engineering associations - in 12 countries - to demonstrate how technologies can combat climate change. The report consists of three parts: Summaries of 10 national climate plans and technology prospects, 5 Key Common Findings, and a Climate Call from Engineers to create a new global climate treaty. The basic assumption of the project is recognition that GHG emissions, and their concentration in the atmosphere, must be reduced to a sustainable level. The project definition of a sustainable level is equivalent to the best-case stabilisation scenario which was presented in the 4th Assessment Report (AR4) by the UN Intergovernmental Panel on Climate Change (IPCC), whereby the global mean temperature is most likely to stabilise at 2.0-2.4 deg. C. The Future Climate website www.futureclimate.info holds more information about the project, including possibility to download project material, including the full national climate plans.

  3. Using Augmented Reality to Plan Virtual Construction Worksite

    Directory of Open Access Journals (Sweden)

    Xiangyu Wang

    2007-12-01

    Full Text Available Current construction worksite layout planning heavily relies on 2D paper media where the worksite planners sketch the future layout adjacent to their real environment. This traditional approach turns out to be ineffective and prone to error because only experienced and well-trained planners are able to generate the effective layout design with paper sketch. Augmented Reality (AR, as a new user interface technology, introduces a completely new perspective for construction worksite planning. This paper disucsses the related AR work and issues in construction and describes the concept and prototype of an AR-based construction planning tool, AR Planner with virtual elements sets and tangible interface. The focus of the paper is to identify and integrate worksite planning rules into the AR planner with the purpose of intelligently preventing potential planning errors and process inefficiency, thus maximizing the overall productivity. Future work includes refining and verifying AR Planner in realistic projects.

  4. Using Augmented Reality to Plan Virtual Construction Worksite

    Directory of Open Access Journals (Sweden)

    Xiangyu Wang

    2008-11-01

    Full Text Available Current construction worksite layout planning heavily relies on 2D paper media where the worksite planners sketch the future layout adjacent to their real environment. This traditional approach turns out to be ineffective and prone to error because only experienced and well-trained planners are able to generate the effective layout design with paper sketch. Augmented Reality (AR, as a new user interface technology, introduces a completely new perspective for construction worksite planning. This paper disucsses the related AR work and issues in construction and describes the concept and prototype of an AR-based construction planning tool, AR Planner with virtual elements sets and tangible interface. The focus of the paper is to identify and integrate worksite planning rules into the AR planner with the purpose of intelligently preventing potential planning errors and process inefficiency, thus maximizing the overall productivity. Future work includes refining and verifying AR Planner in realistic projects.

  5. Hydrogeologic investigations sampling plan: Revision 0

    International Nuclear Information System (INIS)

    1988-11-01

    The goal of this sampling plan is to identify and develop specific plans for those investigative actions necessary to: (1) characterize the hydrologic regime; (2) define the extent and impact of contamination; and (3) predict future contaminant migration for the Weldon Spring Site (WSS) and vicinity. The plan is part of the Weldon Spring Site Remedial Action Project (WSSRAP) sponsored by the US Department of Energy (DOE) and has been developed in accordance with US EPA Remedial Investigation (RI) and Data Quality Objective (DQO) guidelines. The plan consists of a sequence of activities including the evaluation of data, development of a conceptual model, identification of data uses and needs, and the design and implementation of a data collection program. Data will be obtained to: (1) confirm the presence or absence of contaminants; (2) define contaminant sources and modes of transport; (3) delineate extent of contaminant migration and predict future migration; and (4) provide information to support the evaluation and selection of remedial actions. 81 refs., 62 figs., 26 tabs

  6. Planning of Truck Platoons: a Literature Review and Directions for Future Research

    OpenAIRE

    Kishore Bhoopalam, Anirudh; Agatz, Niels; Zuidwijk, Rob

    2017-01-01

    textabstractA truck platoon is a set of virtually linked trucks that drive closely behind one another using automated driving technology. Benefits of truck platooning include cost savings, reduced emissions, and more efficient utilization of road capacity. To fully reap these benefits in the initial phases requires careful planning of platoons based on trucks’ itineraries and time schedules. This paper provides a framework to classify various new transportation planning problems that arise in...

  7. Alternatives for Future Waste Management in Denmark

    DEFF Research Database (Denmark)

    Møller Andersen, Frits; Cimpan, Ciprian; Dall, Ole

    The TOPWASTE project has addressed the challenges of planning robust solutions for future waste management. The purpose was to identify economic and environmentally optimal solutions ‐ taking into account different scenarios for the development of the surrounding systems, such as the energy syste......, environmental and resource efficiency of waste management solutions. The following chapters addresses these issues by answering some of the main research questions of the project.......The TOPWASTE project has addressed the challenges of planning robust solutions for future waste management. The purpose was to identify economic and environmentally optimal solutions ‐ taking into account different scenarios for the development of the surrounding systems, such as the energy system....... During the project, four decision support tools were developed:1. Frida ‐ The EPA's tool for forecasting future waste generation 2. OptiWaste ‐ a new tool for economic optimisation of investments and operation of the combined waste and energy system3. KISS ‐ a new lifecycle based model with focus...

  8. Renewable Electricity Futures Study. Volume 4: Bulk Electric Power Systems: Operations and Transmission Planning

    Energy Technology Data Exchange (ETDEWEB)

    Milligan, M.; Ela, E.; Hein, J.; Schneider, T.; Brinkman, G.; Denholm, P.

    2012-06-01

    The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a future through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%-90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT).

  9. Examining current or future trade-offs for biodiversity conservation in north-eastern Australia.

    Science.gov (United States)

    Reside, April E; VanDerWal, Jeremy; Moilanen, Atte; Graham, Erin M

    2017-01-01

    With the high rate of ecosystem change already occurring and predicted to occur in the coming decades, long-term conservation has to account not only for current biodiversity but also for the biodiversity patterns anticipated for the future. The trade-offs between prioritising future biodiversity at the expense of current priorities must be understood to guide current conservation planning, but have been largely unexplored. To fill this gap, we compared the performance of four conservation planning solutions involving 662 vertebrate species in the Wet Tropics Natural Resource Management Cluster Region in north-eastern Australia. Input species data for the four planning solutions were: 1) current distributions; 2) projected distributions for 2055; 3) projected distributions for 2085; and 4) current, 2055 and 2085 projected distributions, and the connectivity between each of the three time periods for each species. The four planning solutions were remarkably similar (up to 85% overlap), suggesting that modelling for either current or future scenarios is sufficient for conversation planning for this region, with little obvious trade-off. Our analyses also revealed that overall, species with small ranges occurring across steep elevation gradients and at higher elevations were more likely to be better represented in all solutions. Given that species with these characteristics are of high conservation significance, our results provide confidence that conservation planning focused on either current, near- or distant-future biodiversity will account for these species.

  10. Future directions for ADTT concepts

    Energy Technology Data Exchange (ETDEWEB)

    Miliekowski, C. [Scandatronix Corporation, Las Vegas, NV (United States)

    1995-10-01

    This presentation is the collection of viewgraphs used by the author to summarize the future for accelerator based systems for transmutation technologies. The author also emphasizes points which need short term effort to provide critical information necessary for modeling, and planning for future work. The author points out how the value of this technology varies depending upon the political and economic factors which are driving the necessity of dealing with radioactive materials. The issues of feasibility, safety, proliferation, cost, and public perception are also addressed.

  11. Mapping the receptivity of malaria risk to plan the future of control in Somalia.

    Science.gov (United States)

    Noor, Abdisalan Mohamed; Alegana, Victor Adagi; Patil, Anand Prabhakar; Moloney, Grainne; Borle, Mohammed; Yusuf, Fahmi; Amran, Jamal; Snow, Robert William

    2012-01-01

    To measure the receptive risks of malaria in Somalia and compare decisions on intervention scale-up based on this map and the more widely used contemporary risk maps. Cross-sectional community Plasmodium falciparum parasite rate (PfPR) data for the period 2007-2010 corrected to a standard age range of 2 to contemporary (2010) mean PfPR(2-10) and the maximum annual mean PfPR(2-10) (receptive) from the highest predicted PfPR(2-10) value over the study period as an estimate of receptivity. Randomly sampled communities in Somalia. Randomly sampled individuals of all ages. Cartographic descriptions of malaria receptivity and contemporary risks in Somalia at the district level. The contemporary annual PfPR(2-10) map estimated that all districts (n=74) and population (n=8.4 million) in Somalia were under hypoendemic transmission (≤10% PfPR(2-10)). Of these, 23% of the districts, home to 13% of the population, were under transmission of 10%-50% PfPR(2-10)) and the rest as hypoendemic. Compared with maps of receptive risks, contemporary maps of transmission mask disparities of malaria risk necessary to prioritise and sustain future control. As malaria risk declines across Africa, efforts must be invested in measuring receptivity for efficient control planning.

  12. Intergenerational equity and long-term stewardship plans

    International Nuclear Information System (INIS)

    Hocking, E. K.

    2002-01-01

    For an untold number of contaminated sites throughout the world, stewardship will be inevitable. For many such sites, stewardship will be a reasonable approach because of the uncertainties associated with present and future site conditions and site contaminants, the limited performance of available technologies, the nonavailability of technologies, and the risk and cost associated with complete cleanup. Regardless of whether stewardship is a realistic approach to site situations or simply a convenient default, it could be required at most contaminated sites for multiple generations. Because the stewardship plan is required to protect the release of hazardous contaminants to the environment, some use restrictions will be put in place to provide that protection. These use restrictions will limit access to resources for as long as the protection is required. The intergenerational quality of long-term stewardship plans and their inherent limitations on resource use require that they be designed to achieve equity among the affected generations. Intergenerational equity, defined here as the fairness of access to resources across generations, could be achieved through a well-developed stewardship plan that provides future generations with the information they need to make wise decisions about resource use. Developing and implementing such a plan would take into account the failure mechanisms of the plan's components, feature short stewardship time blocks that would allow for periodic reassessments of the site and of the stewardship program's performance, and provide present and future generations with necessary site information

  13. PFP requirements development planning guide

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    The PFP Requirements Development Planning Guide presents the strategy and process used for the identification, allocation, and maintenance of requirements within the Plutonium Finishing Plant (PFP) integrated project baseline. Future revisions to this document will be included as attachments (e.g., results of the PFP Requirements Analysis attributable to this approach). This document is intended be a Project-owned management tool. As such, this document will periodically require revisions resulting from improvements of the information, processes, and techniques as now described. Future updates may be made to this document by PFP management and final approval of the content will be accomplished in a Baseline Change Request as it impacts the Multi-Year Work Plan, or baseline information managed in the Hanford Site Systems Engineering Baseline

  14. GERDA: Recent results and future plans

    Science.gov (United States)

    Lehnert, Björn

    2014-04-01

    The GERmanium Detector Array (GERDA) is an experiment designed to investigate the neutrinoless double beta decay (0 νββ) in 76Ge. An array of high purity germanium detectors isotopically enriched to 87% of 76Ge is operated within 64 m3 of liquid argon (LAr) at the Laboratori Nazionali del Gran Sasso (LNGS). The experiment aims to explore the 0 νββ half-life up to 1.4×1026 yr with a collected exposure of 100 kg yr separated into two physics phases. The data taking of Phase I started in November 2011 and finished in May 2013 with 21.6 kg yr of exposure and a background index (BI) of 2×10-2cts/(kg yr keV) around the Q-value of 2039 keV before pulse shape cuts. Phase II of the experiment is being prepared with additional 30 Broad Energy Germanium (BEGe) detectors and an instrumentation of the LAr, aiming at a BI reduction by a factor of 10 w.r. to Phase I. This paper will present the GERDA setup and the latest results of the experiment including a new measurement of the 2 νββ spectrum of 76Ge and the decomposition of the background spectrum. The 0 νββ analysis, finished in the meanwhile, will be briefly mentioned. Furthermore, the major improvements planned for Phase II will be discussed.

  15. GERDA: Recent results and future plans

    Energy Technology Data Exchange (ETDEWEB)

    Lehnert, Björn, E-mail: bjoernlehnert@gmail.com

    2014-04-01

    The GERmanium Detector Array (GERDA) is an experiment designed to investigate the neutrinoless double beta decay (0νββ) in {sup 76}Ge. An array of high purity germanium detectors isotopically enriched to 87% of {sup 76}Ge is operated within 64 m{sup 3} of liquid argon (LAr) at the Laboratori Nazionali del Gran Sasso (LNGS). The experiment aims to explore the 0νββ half-life up to 1.4×10{sup 26} yr with a collected exposure of 100 kg yr separated into two physics phases. The data taking of Phase I started in November 2011 and finished in May 2013 with 21.6 kg yr of exposure and a background index (BI) of 2×10{sup −2}cts/(kg yr keV) around the Q-value of 2039 keV before pulse shape cuts. Phase II of the experiment is being prepared with additional 30 Broad Energy Germanium (BEGe) detectors and an instrumentation of the LAr, aiming at a BI reduction by a factor of 10 w.r. to Phase I. This paper will present the GERDA setup and the latest results of the experiment including a new measurement of the 2νββ spectrum of {sup 76}Ge and the decomposition of the background spectrum. The 0νββ analysis, finished in the meanwhile, will be briefly mentioned. Furthermore, the major improvements planned for Phase II will be discussed.

  16. Trying to predict the future – resource planning and allocation in CMS

    International Nuclear Information System (INIS)

    Bloom, Kenneth; Fisk, Ian; Kreuzer, Peter; Merino, Gonzalo

    2012-01-01

    In the large LHC experiments the majority of computing resources are provided by the participating countries. These resource pledges account for more than three quarters of the total available computing. The experiments are asked to give indications of their requests three years in advance and to evolve these as the details and constraints become clearer. In this paper we will discuss the resource planning techniques used in CMS to predict the computing resources several years in advance. We will discuss how we attempt to implement the activities of the computing model in spread-sheets and formulas to calculate the needs. We will talk about how those needs are reflected in the 2012 running and how the planned long shutdown of the LHC in 2013 and 2014 impacts the planning process and the outcome. In the end we will speculate on the computing needs in the second major run of LHC.

  17. IVS: Current Status and Future Plans

    Science.gov (United States)

    Behrend, D.; Nothnagel, A.; Petrachenko, W. T.; Tuccari, G.

    2016-12-01

    The International VLBI Service for Geodesy and Astrometry (IVS) is a globally operating service that coordinates and performs Very Long Baseline Interferometry (VLBI) activities through its constituent components. The VLBI activities are associated with the creation, provision, dissemination, and archiving of relevant VLBI data and products. The products mostly pertain to the determination of the celestial and terrestrial reference frames, the Earth orientation parameters (EOP), atmospheric parameters as well as other ancillary parameters. The IVS observational network currently consists of about 40 radio telescopes worldwide. Subsets of these telescopes (8-12 stations) participate in 24-hour observing sessions that are run several times per week and in 1-hour intensive sessions for UT1 determination every day. The current VLBI network was developed mainly in the 1970s and 1980s. A number of factors, including aging infrastructure and demanding new scientific requirements, started to challenge its future sustainability and relevance. In response, the IVS and other groups developed and started implementing the next generation VLBI system, called VGOS (VLBI Global Observing System), at existing and new sites. The VGOS network is expected to reach maturity in the early 2020s. We describe the current status, progress, and anticipated prospects of geodetic/astrometric VLBI and the IVS.

  18. Third World Experience of Education for Planning: Africa.

    Science.gov (United States)

    Tetteh, Austin

    1980-01-01

    Presented is an overview of the development of planning education at the undergraduate, graduate, and professional levels in Africa. Future needs include greater program flexibility and more help for developing countries to establish their own planning education programs. (WB)

  19. Analysis of The Planning Education in the Light of the Contemporary Trends in Planning

    Science.gov (United States)

    Husar, Milan; Ceren Varis, Sila; Ondrejicka, Vladimir

    2017-12-01

    This paper examines the way the planning education is taught and examines the recent trends in the curricula of planning education institutions. The introduction of changing economic systems and planning in the field of education is discussed against these changes. Additionally, the evolution in the planner’s role and how it affects the planning education is discussed. The paper is addressing trends and challenges the countries and their planning changes are facing in 21st century. The trends such as increasing globalization, fuzziness of spatial structures and their borders, complexity and uncertainty and the growing interconnectedness of the world are discussed. Another aim is to prepare a common ground, a platform at the university level for scientific cooperation in the field of planning. This study aims at examining the situation of planning in the contemporary world. The identified challenges include the need for more flexibility in planning and planning education, the emergence of innovations and creativity in planners and planning projects, the necessity of promoting soft skills while keeping the existing technical nature of planning and lastly, the need for more interdisciplinary work. The final part of the paper is discussing the future planning education and recommendations on how the schools of planning should reflect these changes.

  20. Strategic facility planning improves capital decision making.

    Science.gov (United States)

    Reeve, J R

    2001-03-01

    A large, Midwestern IDS undertook a strategic facility-planning process to evaluate its facility portfolio and determine how best to allocate future investments in facility development. The IDS assembled a facility-planning team, which initiated the planning process with a market analysis to determine future market demands and identify service areas that warranted facility expansion. The team then analyzed each of the IDS's facilities from the perspective of uniform capacity measurements, highest and best use compared with needs, building condition and investment-worthiness, and facility growth and site development opportunities. Based on results of the analysis, the strategy adopted entailed, in part, shifting some space from inpatient care to ambulatory care services and demolishing and replacing the 11 percent of facilities deemed to be in the worst condition.

  1. Cathode R&D for Future Light Sources

    Energy Technology Data Exchange (ETDEWEB)

    Dowell, D.H.; /SLAC; Bazarov, I.; Dunham, B.; /Cornell U., CLASSE; Harkay, K.; /Argonne; Hernandez-Garcia; /Jefferson Lab; Legg, R.; /Wisconsin U., SRC; Padmore, H.; /LBL, Berkeley; Rao, T.; Smedley, J.; /Brookhaven; Wan, W.; /LBL, Berkeley

    2010-05-26

    This paper reviews the requirements and current status of cathodes for accelerator applications, and proposes a research and development plan for advancing cathode technology. Accelerator cathodes need to have long operational lifetimes and produce electron beams with a very low emittance. The two principal emission processes to be considered are thermionic and photoemission with the photocathodes being further subdivided into metal and semi-conductors. Field emission cathodes are not included in this analysis. The thermal emittance is derived and the formulas used to compare the various cathode materials. To date, there is no cathode which provides all the requirements needed for the proposed future light sources. Therefore a three part research plan is described to develop cathodes for these future light source applications.

  2. Planning to Explore: Using a Coordinated Multisource Infrastructure to Overcome Present and Future Space Flight Planning Challenges

    Data.gov (United States)

    National Aeronautics and Space Administration — Few human endeavors present as much of a planning and scheduling challenge as space flight, particularly manned space flight. Just on the operational side of it,...

  3. ENTERPRISE RESOURCE STRATEGIC PLANNING: TARGET CHOICE TECHNIQUES

    Directory of Open Access Journals (Sweden)

    A. S. Lankin

    2011-01-01

    Full Text Available Choice of the targets is one of most important elements of the resource planning system. Particular feature of the strategic planning is development of future alternatives for the enterprise. Main resource strategic planning cycle elements: examination of principal external and internal environment components; forming the company mission; development of long-term targets; concretization of the long-term targets through short-term aims; examination of strategies and final choice.

  4. Material requirements planning: a better way to plan material.

    Science.gov (United States)

    Tomas, S

    1990-08-01

    MRP systems can benefit hospitals in their management of material. Systems provide the means to schedule surgical procedures, calculate material requirements, release orders, plan future capacity requirements, and release and track work orders. MRP can be a powerful tool if properly implemented. All it takes is individuals dedicated to maintaining the discipline and data integrity required to make MRP successful.

  5. Current status of RCA projects and strategies for future implementation

    International Nuclear Information System (INIS)

    Kim, Kyoung Pyo; Lee, Jeong Kong

    1998-12-01

    This report is intended to provide basic overall information about ways to promote technical cooperation within the framework of RCA to accelerate and coordinate cooperative activities in nuclear science and technology in Asia and the Pacific region through a thorough review on the current status and through suggesting future implementation strategies. The contents of this report include an overall introduction of RCA, guidelines and operating rules for RCA programmes, current status and future plans for RCA projects as well as the RCA vision for the next 25 years. By reviewing the current status and future implementation strategies for RCA projects, it will help to set up a national nuclear policy aimed at seeking maximum benefits from participation in RCA projects and to implement programmes for nuclear cooperation with Asian-Pacific countries. It is expected that as a lead country for the energy sector, which is one of five thematic areas for the year 1999 - 2000 cycle programmes, Korea will continue to make significant contributions towards the implementation of RCA programmes in the future. With this report, we plan to keep up with future developments as well as implement an effective cooperation with the countries in the region so that the opinion of Korea, one of the nuclear advanced countries in the region, can be fully reflected in the establishment of future plans for RCA programmes. (author). 3 refs., 5 tabs., 1 fig

  6. Behavioral Health and Performance at NASA JSC: Recent Successes and Future Plan for BHP Research and Operations

    Science.gov (United States)

    Leveton, L. B.; VanderArk, S. T.

    2014-01-01

    The Behavioral Health and Performance discipline at NASA Johnson Space Center is organized into two distinct Divisions (Biomedical Research and Environmental Science Division and Space and Clinical Operations Division) but is integrated and interrelated in its day-to-day work. Ongoing operations supporting NASA's spaceflight goals benefit from the research portfolios that address risks to mission success. Similarly, these research portfolios are informed by operations to ensure investigations stay relevant given the dynamic environment of spaceflight. There are many success stories that can be presented where initial work begun as a BHP Research project, and funded through the Human Research Program, was fully implemented in operations or addressed an operational need. Examples include improving effectiveness of the debriefings used within Mission Control by the Mission Operations Directorate and countermeasures for fatigue management. There is also ongoing collaboration with research and operations for developing selection methods for future generation astronauts, and to enhance and inform the current family support function. The objective of this panel is to provide examples of recent success stories, describe areas where close collaboration is benefitting ongoing research and operations, and summarize how this will come together as NASA plans for the one year ISS mission - a unique opportunity for both BHP operations and research to learn more about preparing and supporting crewmembers for extended missions in space. The proposed panel will be comprised of six presentations, each describing a unique aspect of research or operations and the benefits to current and future spaceflight.

  7. Deeply virtual Compton scattering. Results and future

    International Nuclear Information System (INIS)

    Nowak, W.D.

    2005-03-01

    Access to generalised parton distributions (GPDs) through deeply virtual Compton scattering (DVCS) is briefly described. Presently available experimental results on DVCS are summarized in conjunction with plans for future measurements. (orig.)

  8. Assuring future competence in nuclear safety in Finland

    International Nuclear Information System (INIS)

    Koskinen, K.

    2004-01-01

    To improve competence management at the regulatory body a competence analysis was carried out and a human resource plan for nuclear safety area for the near future was made. STUK studied carefully the models used in other public sector organisations and adjusted the method to its own purposes. The model used has four competence categories: substance related, management skills, common working skills and STUK related working skills. Substance related competences were defined and described at working unit level. Descriptions for the rest three categories were made at STUK level and those were common for all departments. Results of competence analysis are encouraging. Most competence areas are covered at proper level, some will need to be improved but none was totally missing. For the future challenges extra attention should be paid to knowledge management. Two separate plans were made on the basis of these results: plan for training regulatory personnel and HR-plan (at the first stage recruiting plan for next five years). It is STUK's experience that the competence analysis is worth the trouble. It gives the organisation and employees a common conception on its competences and on future needs. It also makes it easier to motivate all staff members to use their working hours on training and capability building. On the other hand it must be admitted that it takes resources and all employees have not been very anxious to do this. The results of competence analysis should lead to some improvement projects. The progress of improvement actions should be followed-up on regularly basis. It is important not to forget to communicate the results to employees

  9. Korean national QPE technique development: Analysis of current QPE results and future plan

    Science.gov (United States)

    Cha, Joo Wan

    2013-04-01

    Korea Meteorological Administration(KMA) has developed a Real-time ADjusted Radar-AWS (Automatic Weather Station) Rainrate (RAD-RAR) system using eleven radars over the South Korea. The procedure of the RAD-RAR system in real time consists of four steps: 1) the quality control of volumetric reflectivity for each radar, 2) the computation of the every 10-min rain gauge rainfall within each radar, 3) the real time (10 min-updated) rainfall estimation by the Z-R relationship minimizing the difference between the 1.5-km constant altitude plan precipitation indicator and rain gauge rainfall based on Window Probability Matching Method(WPMM) and by the real-time bias correction of RAD-RAR conducted at every 10 minutes for each radar by making the bias, and 4) the composition of the 11-radar estimated rainfall data. In addition, a local gauge correction method applies for RAD-RAR system. Therefore, the correlation coefficient of R2 = 0.81 is obtained between the daily accumulated observed and RAD-RAR estimated rainfall in 2012. We like to develop a new QPE system using the multi-sensor(radar, rain gauge, numerical model output, and lightning) data for newly improving Korean national QPE system. We made the prototype QPE system in 2012 and improve the detail techniques now. In the future, the new high performance QPE system will include a dual polarization radar observation technique for providing more accurate and valuable national QPE data

  10. Righting Your Future: LRE Lesson Plans for Today and Tomorrow.

    Science.gov (United States)

    CRADLE: Center for Research and Development in Law-Related Education, Winston-Salem, NC.

    A compilation of more than 50 lesson plans on law related education, these materials were written by middle school and high school teachers from around the United States. The lessons cover a broad range of topics including "DNA Fingerprints and the Constitutional Right to Privacy"; "Censorship and Book Banning in Public Schools"; "The Death…

  11. Storage rings: Past, present and future

    International Nuclear Information System (INIS)

    Krisch, A.D.

    2000-01-01

    This lecture will attempt to review storage rings: past, present and future. I will spend more time on the past, because the past has produced most of our data, while the present can be rather brief. There is not yet much future data, but there are some plans about what we hope for. Professor Andy Sessler of Berkeley, who recently reviewed the early history of colliders, loaned me his slides; for this I have much appreciation

  12. Programmatic Environmental Assessment for Base General Plan Development, Schriever Air Force Base, Colorado

    Science.gov (United States)

    2012-06-01

    and is dominated by blue grama (Bouteloua gracilis), buffalo grass (Buchloe dactyloides), three-awned grass (Aristida purpurea), dropseed (Sporobolus...General Plan are to achieve optimal land use planning, protect the natural and human environment, and plan for future mission growth . The Proposed Action...future mission growth , and to improve environmental quality, recreation opportunities, and the safety and medical functions on Base. According to space

  13. Semi-inclusive DIS Experiments Using Transversely Polarized Targets in Hall-A: Current Results and Future Plans

    Directory of Open Access Journals (Sweden)

    Allada Kalyan

    2012-12-01

    Full Text Available Measurement of single (SSA and double spin asymmetries (DSA in semiinclusive DIS reactions using polarized targets provide a powerful method to probe transverse momentum dependent parton distribution functions (TMDs. In particular, the experimentally measured SSA on nucleon targets can help in extracting the transversity and Sivers distribution functions of u and d-quarks. Similarly, the measured DSA are sensitive to the quark spin-orbital correlations, and provide an access to the TMD parton distribution function (g1T. A recent experiment conducted in Hall-A Jefferson Lab using transversely polarized 3He provide first such measurements on “effective” neutron target. The measurement was performed using 5.9 GeV beam from CEBAF and measured the target SSA/DSA in the SIDIS reaction 3He↑(e, e′π±X. The kinematical range, x = 0.19 ~ 0.34, at Q2 = 1.77 ~ 2.73 (GeV/c2, was focused on the valence quark region. The results from this measurement along with our plans for future high precision measurements in Hall-A are presented.

  14. Shanghai Futures Exchange Plans to Introduce Tin,Nickel,Alumina,Stainless steel,and Rare Earth Varieties Into the Futures Market

    Institute of Scientific and Technical Information of China (English)

    2014-01-01

    <正>On April 29,the Shanghai Futures Exchange and the China Nonferrous Metals Industry Association signed strategic cooperation agreement in Shanghai;Yang Maijun,Director of the Shanghai Futures Exchange,and Chen Quanxun,Counselor of the State Council and Chairman of the China Nonferrous Metals Industry Association,along with others attended the agreement signing ceremony.

  15. Planning Tool for Strategic Evaluation of Facility Plans - 13570

    Energy Technology Data Exchange (ETDEWEB)

    Magoulas, Virginia; Cercy, Michael [Savannah River National Laboratory, Savannah River Site, Aiken, SC 29808 (United States); Hall, Irin [Newport News Shipbuilding, 4101 Washington Ave., Newport News, VA 23607 (United States)

    2013-07-01

    Savannah River National Laboratory (SRNL) has developed a strategic planning tool for the evaluation of the utilization of its unique resources for processing and research and development of nuclear materials. The Planning Tool is a strategic level tool for assessing multiple missions that could be conducted utilizing the SRNL facilities and showcasing the plan. Traditional approaches using standard scheduling tools and laying out a strategy on paper tended to be labor intensive and offered either a limited or cluttered view for visualizing and communicating results. A tool that can assess the process throughput, duration, and utilization of the facility was needed. SRNL teamed with Newport News Shipbuilding (NNS), a division of Huntington Ingalls Industries, to create the next generation Planning Tool. The goal of this collaboration was to create a simulation based tool that allows for quick evaluation of strategies with respect to new or changing missions, and clearly communicates results to the decision makers. This tool has been built upon a mature modeling and simulation software previously developed by NNS. The Planning Tool provides a forum for capturing dependencies, constraints, activity flows, and variable factors. It is also a platform for quickly evaluating multiple mission scenarios, dynamically adding/updating scenarios, generating multiple views for evaluating/communicating results, and understanding where there are areas of risks and opportunities with respect to capacity. The Planning Tool that has been developed is useful in that it presents a clear visual plan for the missions at the Savannah River Site (SRS). It not only assists in communicating the plans to SRS corporate management, but also allows the area stakeholders a visual look at the future plans for SRS. The design of this tool makes it easily deployable to other facility and mission planning endeavors. (authors)

  16. Planning Tool for Strategic Evaluation of Facility Plans - 13570

    International Nuclear Information System (INIS)

    Magoulas, Virginia; Cercy, Michael; Hall, Irin

    2013-01-01

    Savannah River National Laboratory (SRNL) has developed a strategic planning tool for the evaluation of the utilization of its unique resources for processing and research and development of nuclear materials. The Planning Tool is a strategic level tool for assessing multiple missions that could be conducted utilizing the SRNL facilities and showcasing the plan. Traditional approaches using standard scheduling tools and laying out a strategy on paper tended to be labor intensive and offered either a limited or cluttered view for visualizing and communicating results. A tool that can assess the process throughput, duration, and utilization of the facility was needed. SRNL teamed with Newport News Shipbuilding (NNS), a division of Huntington Ingalls Industries, to create the next generation Planning Tool. The goal of this collaboration was to create a simulation based tool that allows for quick evaluation of strategies with respect to new or changing missions, and clearly communicates results to the decision makers. This tool has been built upon a mature modeling and simulation software previously developed by NNS. The Planning Tool provides a forum for capturing dependencies, constraints, activity flows, and variable factors. It is also a platform for quickly evaluating multiple mission scenarios, dynamically adding/updating scenarios, generating multiple views for evaluating/communicating results, and understanding where there are areas of risks and opportunities with respect to capacity. The Planning Tool that has been developed is useful in that it presents a clear visual plan for the missions at the Savannah River Site (SRS). It not only assists in communicating the plans to SRS corporate management, but also allows the area stakeholders a visual look at the future plans for SRS. The design of this tool makes it easily deployable to other facility and mission planning endeavors. (authors)

  17. Scenario Planning Implementation : A Case of a Malaysian Organisation

    OpenAIRE

    Lim, Lee Chin

    2007-01-01

    In this dynamic and ever changing era, uncertainties are inevitable. A successful organisation is one that is able to address the uncertainties in a world that is complex and unpredictable. Scenario planning is a strategic management tool that offers an alternative approach to planning in a world where linear logic does not prevail (Geons, 2001). It is a method for learning about the future by understanding the uncertainties and driving forces affecting an organisation’s future. Its core bene...

  18. Big plans.

    Science.gov (United States)

    Fitch, Kevin F; Doyle, James F

    2005-09-01

    In Elmhurst Memorial Healthcare's capital planning method: Future replacement costs of assets are estimated by inflating their historical cost over their lives. A balanced model is created initially based on the assumption that rates of revenue growth, inflation, investment income, and interest expense are all equal. Numbers then can be adjusted to account for possible variations, such as excesses or shortages in investment or debt balances.

  19. Strategic planning in healthcare organizations.

    Science.gov (United States)

    Rodríguez Perera, Francisco de Paula; Peiró, Manel

    2012-08-01

    Strategic planning is a completely valid and useful tool for guiding all types of organizations, including healthcare organizations. The organizational level at which the strategic planning process is relevant depends on the unit's size, its complexity, and the differentiation of the service provided. A cardiology department, a hemodynamic unit, or an electrophysiology unit can be an appropriate level, as long as their plans align with other plans at higher levels. The leader of each unit is the person responsible for promoting the planning process, a core and essential part of his or her role. The process of strategic planning is programmable, systematic, rational, and holistic and integrates the short, medium, and long term, allowing the healthcare organization to focus on relevant and lasting transformations for the future. Copyright © 2012 Sociedad Española de Cardiología. Published by Elsevier Espana. All rights reserved.

  20. Key Future Engineering Capabilities for Human Capital Retention

    Science.gov (United States)

    Sivich, Lorrie

    Projected record retirements of Baby Boomer generation engineers have been predicted to result in significant losses of mission-critical knowledge in space, national security, and future scientific ventures vital to high-technology corporations. No comprehensive review or analysis of engineering capabilities has been performed to identify threats related to the specific loss of mission-critical knowledge posed by the increasing retirement of tenured engineers. Archival data from a single diversified Fortune 500 aerospace manufacturing engineering company's engineering career database were analyzed to ascertain whether relationships linking future engineering capabilities, engineering disciplines, and years of engineering experience could be identified to define critical knowledge transfer models. Chi square, logistic, and linear regression analyses were used to map patterns of discipline-specific, mission-critical knowledge using archival data of engineers' perceptions of engineering capabilities, key developmental experiences, and knowledge learned from their engineering careers. The results from the study were used to document key engineering future capabilities. The results were then used to develop a proposed human capital retention plan to address specific key knowledge gaps of younger engineers as veteran engineers retire. The potential for social change from this study involves informing leaders of aerospace engineering corporations on how to build better quality mentoring or succession plans to fill the void of lost knowledge from retiring engineers. This plan can secure mission-critical knowledge for younger engineers for current and future product development and increased global competitiveness in the technology market.

  1. Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning

    Energy Technology Data Exchange (ETDEWEB)

    Mill, Andrew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Barbose, Galen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Seel, Joachim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Dong, Changgui [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mai, Trieu [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sigrin, Ben [National Renewable Energy Lab. (NREL), Golden, CO (United States); Zuboy, Jarrett [Independent Consultant

    2016-08-19

    The rapid growth of distributed solar photovoltaics (DPV) has critical implications for U.S. utility planning processes. This report informs utility planning through a comparative analysis of roughly 30 recent utility integrated resource plans or other generation planning studies, transmission planning studies, and distribution system plans. It reveals a spectrum of approaches to incorporating DPV across nine key planning areas, and it identifies areas where even the best current practices might be enhanced. 1) Forecasting DPV deployment: Because it explicitly captures several predictive factors, customer-adoption modeling is the most comprehensive forecasting approach. It could be combined with other forecasting methods to generate a range of potential futures. 2) Ensuring robustness of decisions to uncertain DPV quantities: using a capacity-expansion model to develop least-cost plans for various scenarios accounts for changes in net load and the generation portfolio; an innovative variation of this approach combines multiple per-scenario plans with trigger events, which indicate when conditions have changed sufficiently from the expected to trigger modifications in resource-acquisition strategy. 3) Characterizing DPV as a resource option: Today’s most comprehensive plans account for all of DPV’s monetary costs and benefits. An enhanced approach would address non-monetary and societal impacts as well. 4) Incorporating the non-dispatchability of DPV into planning: Rather than having a distinct innovative practice, innovation in this area is represented by evolving methods for capturing this important aspect of DPV. 5) Accounting for DPV’s location-specific factors: The innovative propensity-to-adopt method employs several factors to predict future DPV locations. Another emerging utility innovation is locating DPV strategically to enhance its benefits. 6) Estimating DPV’s impact on transmission and distribution investments: Innovative practices are being

  2. Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning

    Energy Technology Data Exchange (ETDEWEB)

    Mills, Andrew D.; Barbose, Galen L.; Seel, Joachim; Dong, Changgui; Mai, Trieu; Sigrin, Ben; Zuboy, Jarett

    2016-08-01

    The rapid growth of distributed solar photovoltaics (DPV) has critical implications for U.S. utility planning processes. This report informs utility planning through a comparative analysis of roughly 30 recent utility integrated resource plans or other generation planning studies, transmission planning studies, and distribution system plans. It reveals a spectrum of approaches to incorporating DPV across nine key planning areas, and it identifies areas where even the best current practices might be enhanced. (1) Forecasting DPV deployment: Because it explicitly captures several predictive factors, customer-adoption modeling is the most comprehensive forecasting approach. It could be combined with other forecasting methods to generate a range of potential futures. (2) Ensuring robustness of decisions to uncertain DPV quantities: using a capacity-expansion model to develop least-cost plans for various scenarios accounts for changes in net load and the generation portfolio; an innovative variation of this approach combines multiple per-scenario plans with trigger events, which indicate when conditions have changed sufficiently from the expected to trigger modifications in resource-acquisition strategy. (3) Characterizing DPV as a resource option: Today's most comprehensive plans account for all of DPV's monetary costs and benefits. An enhanced approach would address non-monetary and societal impacts as well. (4) Incorporating the non-dispatchability of DPV into planning: Rather than having a distinct innovative practice, innovation in this area is represented by evolving methods for capturing this important aspect of DPV. (5) Accounting for DPV's location-specific factors: The innovative propensity-to-adopt method employs several factors to predict future DPV locations. Another emerging utility innovation is locating DPV strategically to enhance its benefits. (6) Estimating DPV's impact on transmission and distribution investments: Innovative

  3. Operations planning for Space Station Freedom - And beyond

    Science.gov (United States)

    Gibson, Stephen S.; Martin, Thomas E.; Durham, H. J.

    1992-01-01

    The potential of automated planning and electronic execution systems for enhancing operations on board Space Station Freedom (SSF) are discussed. To exploit this potential the Operations Planning and Scheduling Subsystem is being developed at the NASA Johnson Space Center. Such systems may also make valuable contributions to the operation of resource-constrained, long-duration space habitats of the future. Points that should be considered during the design of future long-duration manned space missions are discussed. Early development of a detailed operations concept as an end-to-end mission description offers a basis for iterative design evaluation, refinement, and option comparison, particularly when used with an advanced operations planning system capable of modeling the operations and resource constraints of the proposed designs.

  4. Institutional Plan FY 2003 - 2007

    Energy Technology Data Exchange (ETDEWEB)

    Chartock, Michael; Hansen, Todd

    2003-01-27

    The Fiscal Year (FY) 2003-2007 Institutional Plan describes the strategic directions and key issues that Lawrence Berkeley National Laboratory management must address with the Department of Energy (DOE) in charting its future as a multiprogram national laboratory. The Plan provides an overview of the Laboratory's mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Plan facilitates the Department of Energy's ongoing efforts to strengthen the Integrated Laboratory System. Preparation and review of the Institutional Plan is one element of the Department of Energy's strategic management planning activities, implemented through an annual planning process. The Plan supports the President's Management Agenda and the Government Performance and Results Act of 1993. The Plan complements the current performance-based contract between the Department of Energy and the Regents of the University of California, and summarizes Best Management Practices for a potential future results-based contract as a basis for achieving DOE goals and the Laboratory's scientific and operations objectives. It identifies technical and administrative directions in the context of national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the Plan is coordinated by the Planning and Strategic Development Office from information contributed by Berkeley Lab's scientific and support divisions and DOE comments on prior years' plans. The Laboratory Mission section identifies the specific strengths of Berkeley Lab that contribute to the mission in general and the Integrated Laboratory System in particular. The Laboratory Strategic Plan section identifies the existing activities in support of DOE Office of Science and other sponsors; support for DOE goals; and the

  5. Future Leaders: The Way Forward?

    Science.gov (United States)

    Earley, Peter; Weindling, Dick; Bubb, Sara; Glenn, Meli

    2009-01-01

    The recruitment and retention of senior school leaders is high on the UK Government's agenda with much attention currently being given to succession planning. Future Leaders and other fast track leadership development programmes are, in part, a response to this "crisis" brought about by demographic change--many headteachers are due to…

  6. Housing, health and master planning: rules of engagement.

    Science.gov (United States)

    Harris, P; Haigh, F; Thornell, M; Molloy, L; Sainsbury, P

    2014-04-01

    Knowledge about health focussed policy collaboration to date has been either tactical or technical. This article focusses on both technical and tactical issues to describe the experience of cross-sectoral collaboration between health and housing stakeholders across the life of a housing master plan, including but not limited to a health impact assessment (HIA). A single explanatory case study of collaboration on a master plan to regenerate a deprived housing estate in Western Sydney was developed to explain why and how the collaboration worked or did not work. Data collection included stakeholder interviews, document review, and reflections by the health team. Following a realist approach, data was analysed against established public policy theory dimensions. Tactically we did not know what we were doing. Despite our technical knowledge and skills with health focussed processes, particularly HIA, we failed to appreciate complexities inherent in master planning. This limited our ability to provide information at the right points. Eventually however the HIA did provide substantive connections between the master plan and health. We use our analysis to develop technical and tactical rules of engagement for future cross-sectoral collaboration. This case study from the field provides insight for future health focussed policy collaboration. We demonstrate the technical and tactical requirements for future intersectoral policy and planning collaborations, including HIAs, with the housing sector on master planning. The experience also suggested how HIAs can be conducted flexibly alongside policy development rather than at a specific point after a policy is drafted. Copyright © 2014 The Royal Society for Public Health. All rights reserved.

  7. Future strategies on IAEA activities and technical cooperation programmes

    International Nuclear Information System (INIS)

    Kim, Kyoung Pyo; Hong, Young Don

    1998-10-01

    This study provides basic background information about the establishment of the IAEA, its mission, major activities, General Conference , and Board of Governors, structure and functions of the Secretariat. The IAEA Mid-term plan, to be implemented in the years 1998 - 2003, includes the enhancement of its functional effectiveness, analysis of the changing developments, adjustment of its priorities, and evaluation of its programmes, are describes in full detail. This plan is divided into 6 major areas ; nuclear power and the fuel cycle, nuclear applications, nuclear, radiation and radwaste safety, verification and security of nuclear material, management of technical cooperation for development, policy making, coordination and support. It is also expected that the IAEA plan provides an opportunity to understand the future directions of IAEA programmes and its operational philosophy, thus greatly contributing to Koreas establishment of its own future directions for expanded cooperation with the IAEA, and urges to device effective domestic strategies. This plan will also contribute to the evaluation of Koreas responsibility as a member of the Board of Governors as well as enhance Koreas role as an Advisory Group Member. It is expected that this study is useful for nuclear-related organizations wishing to establish basic directions for the efficient implementation of IAEA technical cooperation programs in the future. (author). 16 refs., 6 tabs., 16 figs

  8. Report of the Long-Range Planning Committee

    International Nuclear Information System (INIS)

    1984-01-01

    This is the final report of the Long-Range Planning Committee of the Lawrence Livermore National Laboratory. It describes the make-up, purpose, working assumptions, and activities of the Committee and discusses the work done by the Committee on defense matters, energy, a number of additional topics, and future long-range planning activities

  9. Laredo District Coahuila/Nuevo Leon/Tamaulipas border master plan.

    Science.gov (United States)

    2012-06-01

    Border Master Plans document a regions needs and priorities, and recommend a mechanism to ensure coordination on current and planned future port of entry (POE) projects and supporting transportation infrastructure to serve the anticipated demand i...

  10. Canada`s green plan - The second year. Summary

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    Canada`s Green Plan is the national strategy and action plan for sustainable development launched by the federal government. The Green Plan`s goal is `to secure for current and future generations a safe and healthy environment and a sound and prosperous economy.` It represents a fundamental shift in the way the federal government views economic development and environmental protection: they are inextricably linked; both are critical to the health and well-being of Canadians. Substantial development has been made in Canada, with advances being made on the Green Plan`s short-term objectives and on our longer term priorities.

  11. Robustness in practice--the regional planning of health services.

    Science.gov (United States)

    Best, G; Parston, G; Rosenhead, J

    1986-05-01

    Earlier work has criticized the dominant tendencies in operational research contributions to health services planning as characterized by optimization, implausible demands for data, depoliticization, hierarchy and inflexibility. This paper describes an effort which avoids at least some of these pitfalls. The project was to construct a planning system for a regional health council in Ontario, Canada, which would take account of the possible alternative future states of the health-care system's environment and would aim to keep options for future development open. The planning system devised is described in the paper. It is based on robustness analysis, which evaluates alternative initial action sets in terms of the useful flexibility they preserve. Other features include the explicit incorporation of pressures for change generated outside the health-care system, and a satisficing approach to the identification of both initial action sets and alternative future configurations of the health-care system. It was found possible to borrow and radically 're-use' techniques or formulations from the mainstream of O.R. contributions. Thus the 'reference projection' method was used to identify inadequacies in performance which future health-care system configurations must repair. And Delphi analysis, normally a method for generating consensus, was used in conjunction with cluster analysis of responses to generate meaningfully different alternative futures.

  12. Technical Paper on Physical Planning and Monitoring Tools

    DEFF Research Database (Denmark)

    Vagnby, Bo Hellisen

    and maintenance of such buildings.    Further, the paper outlines a number of physical planning and building tools to guide future planning and design development, and it suggests a range of action-oriented operational evaluation studies in order to improve the physical learning environment....

  13. College of New Caledonia Three Year Plan, 1991-1994.

    Science.gov (United States)

    Seens, Paul

    In 1991, the College of New Caledonia (CNC) (British Columbia, Canada) prepared this 3-year plan representing the college's vision of the future as it attempts to meet the educational needs of the region. Identifying key opportunities open to CNC, this nine-part plan describes CNC's mission, goals, plans, and objectives. Section I provides an…

  14. Design in the planning arena : how regional designing influences strategic spatial planning

    NARCIS (Netherlands)

    Kempenaar, Annet

    2017-01-01

    Regional designing is a form of spatial design that engages with the future physical form and arrangement of regions, including its aesthetic appearances and how it can come about. As such it is closely entangled with spatial planning. This thesis studies the influence of regional designing on

  15. SLC status and SLAC [Stanford Linear Accelerator Center] future plans

    International Nuclear Information System (INIS)

    Richter, B.

    1989-08-01

    In this presentation, I shall discuss the linear collider program at the Stanford Linear Accelerator Center as it is now, and as we hope to see it evolve over the next few years. Of greatest interest to the high energy accelerator physics community gathered here is the development of the linear collider concept, and so I shall concentrate most of this paper on a discussion of the present status and future evolution of the SLC. I will also briefly discuss the research and development program that we are carrying out aimed at the realization of the next generation of high-energy linear colliders. SLAC had a major colliding-beam storage-ring program as well, including present rings and design studies on future high-luminosity projects, but time constraints preclude a discussion of them. 8 figs., 3 tabs

  16. Hanford Waste Management Plan, 1987

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of the Hanford Waste Management Plan (HWMP) is to provide an integrated plan for the safe storage, interim management, and disposal of existing waste sites and current and future waste streams at the Hanford Site. The emphasis of this plan is, however, on the disposal of Hanford Site waste. The plans presented in the HWMP are consistent with the preferred alternative which is based on consideration of comments received from the public and agencies on the draft Hanford Defense Waste Environmental Impact Statement (HDW-EIS). Low-level waste was not included in the draft HDW-EIS whereas it is included in this plan. The preferred alternative includes disposal of double-shell tank waste, retrievably stored and newly generated TRU waste, one pre-1970 TRU solid waste site near the Columbia River and encapsulated cesium and strontium waste

  17. Personalized medicine: CCO's vision, accomplishments and future plans.

    Science.gov (United States)

    Guo, Jennifer; Kamel-Reid, Suzanne; Rutherford, Michael; Hart, Jennifer; Melamed, Saul; Pollett, Aaron

    2015-01-01

    Personalized medicine is a rapidly expanding field, with the potential to improve patient care. Its benefits include increasing efficiency in cancer screening, diagnosis and treatment through early detection, targeted therapy and identifying individuals with an underlying genetic risk for cancer or adverse outcomes. Through the work of Cancer Care Ontario (CCO)'s Pathology and Laboratory Medicine Program, a number of initiatives have been undertaken to support developments in personalized medicine. In keeping with the momentum of recent accomplishments, CCO has led the formation of the Personalized Medicine Steering Committee to develop a comprehensive provincial genetics strategy for the future of cancer care. Copyright © 2014 Longwoods Publishing.

  18. Generation of database for future decommissioning of CIRUS

    International Nuclear Information System (INIS)

    Sankar, S.; Rao, D.V.H.; Vakharwala, K.J.; Jauhri, G.H.; Maheshchandra

    2002-01-01

    Safe decommissioning of a research reactor in a planned manner is inevitable at the end of its useful life even after refurbishment and life extension. This involves advance planning, adopting state of the art technology, development of required new technology, a well thought out plan for nuclear waste management and necessary research and development in the areas of decontamination to recycle and reuse most of the metallic materials. The 40 MW thermal research reactor CIRUS at Bhabha Atomic Research Centre, Mumbai, India is being refurbished after 37 years of operation. Several part-decommissioning activities were carried out during the refurbishment. This was also the right time and state of the reactor to generate the necessary data and document the experience gained and lessons learned to aid in the planning for future decommissioning of CIRUS. This report presents the details of radiological mapping and characterization studies carried out, experience gained in cleaning/decontamination, dismantlement works carried out for repairs/replacement of structures, systems and components and development of new devices/techniques. It is expected that this work would considerably aid in working out an appropriate strategy of decommissioning of CIRUS when needed in the future. (author)

  19. Strategic R and D Planning for an Energy Future in an Interdependent World

    Energy Technology Data Exchange (ETDEWEB)

    Schainker, R.B.; Gellings, C.; Rosinski, S.

    2007-07-01

    This paper presents a summary of key results of a comprehensive analysis of technology R and D needs for the U.S. electric utility industry. It focuses on the impacts of the world-wide interdependencies for the price of gas/oil fuel and the costs for environmental emissions as drivers to define four 'what-if' scenarios that act as a basis to define key R and D topics U.S. electric utilities need to address. This paper is based on past work the U.S. Electric Power Research Institute performed on a technology roadmap, which is a high-level document that provides guidance on strategic technology planning over the next 40-50 years for the electricity industry. However, critical uncertainties over this timeframe - such as fuel prices, the economy, the environment, technology advances, and regulatory policies - complicate effective identification and development of R and D priorities. To address these uncertainties and to develop a nearer-term technology-oriented action plan, EPRI undertook an Electric Power Industry Technology Scenarios project that uses scenario planning to explicitly incorporate uncertainty and focuses on a 20-year planning horizon. (auth)

  20. A taxonomy of prospection: introducing an organizational framework for future-oriented cognition.

    Science.gov (United States)

    Szpunar, Karl K; Spreng, R Nathan; Schacter, Daniel L

    2014-12-30

    Prospection--the ability to represent what might happen in the future--is a broad concept that has been used to characterize a wide variety of future-oriented cognitions, including affective forecasting, prospective memory, temporal discounting, episodic simulation, and autobiographical planning. In this article, we propose a taxonomy of prospection to initiate the important and necessary process of teasing apart the various forms of future thinking that constitute the landscape of prospective cognition. The organizational framework that we propose delineates episodic and semantic forms of four modes of future thinking: simulation, prediction, intention, and planning. We show how this framework can be used to draw attention to the ways in which various modes of future thinking interact with one another, generate new questions about prospective cognition, and illuminate our understanding of disorders of future thinking. We conclude by considering basic cognitive processes that give rise to prospective cognitions, cognitive operations and emotional/motivational states relevant to future-oriented cognition, and the possible role of procedural or motor systems in future-oriented behavior.

  1. Robinson Rancheria Strategic Energy Plan; Middletown Rancheria Strategic Energy Plan, Scotts Valley Rancheria Strategic Energy Plan, Elem Indian Colony Strategic Energy Plan, Upperlake Rancheria Strategic Energy Plan, Big Valley Rancheria Strategic Energy Plan

    Energy Technology Data Exchange (ETDEWEB)

    McGinnis and Associates LLC

    2008-08-01

    The Scotts Valley Band of Pomo Indians is located in Lake County in Northern California. Similar to the other five federally recognized Indian Tribes in Lake County participating in this project, Scotts Valley Band of Pomo Indians members are challenged by generally increasing energy costs and undeveloped local energy resources. Currently, Tribal decision makers lack sufficient information to make informed decisions about potential renewable energy resources. To meet this challenge efficiently, the Tribes have committed to the Lake County Tribal Energy Program, a multi Tribal program to be based at the Robinson Rancheria and including The Elem Indian Colony, Big Valley Rancheria, Middletown Rancheria, Habematolel Pomo of Upper Lake and the Scotts Valley Pomo Tribe. The mission of this program is to promote Tribal energy efficiency and create employment opportunities and economic opportunities on Tribal Lands through energy resource and energy efficiency development. This program will establish a comprehensive energy strategic plan for the Tribes based on Tribal specific plans that capture economic and environmental benefits while continuing to respect Tribal cultural practices and traditions. The goal is to understand current and future energy consumption and develop both regional and Tribe specific strategic energy plans, including action plans, to clearly identify the energy options for each Tribe.

  2. Drug plan design incentives among Medicare prescription drug plans.

    Science.gov (United States)

    Huskamp, Haiden A; Keating, Nancy L; Dalton, Jesse B; Chernew, Michael E; Newhouse, Joseph P

    2014-07-01

    Medicare Advantage prescription drug plans (MA-PDs) and standalone prescription drug plans (PDPs) face different incentives for plan design resulting from the scope of covered benefits (only outpatient drugs for PDPs versus all drug and nondrug services for Medicare Advantage [MA]/MA-PDs). The objective is to begin to explore how MA-PDs and PDPs may be responding to their different incentives related to benefit design. We compared 2012 PDP and MA-PD average formulary coverage, prior authorization (PA) or step therapy use, and copayment requirements for drugs in 6 classes used commonly among Medicare beneficiaries. We primarily used 2012 Prescription Drug Plan Formulary and Pharmacy Network Files and MA enrollment data. 2011 Truven Health MarketScan claims were used to estimate drug prices and to compute drug market share. Average coverage and PA/step rates, and average copayment requirements, were weighted by plan enrollment and drug market share. MA-PDs are generally more likely to cover and less likely to require PA/step for brand name drugs with generic alternatives than PDPs, and MA-PDs often have lower copayment requirements for these drugs. For brands without generics, we generally found no differences in average rates of coverage or PA/step, but MA-PDs were more likely to cover all brands without generics in a class. We found modest, confirmatory evidence suggesting that PDPs and MA-PDs respond to different incentives for plan design. Future research is needed to understand the factors that influence Medicare drug plan design decisions.

  3. Virtual reality in decommissioning projects: experiences, lessons learned and future plans

    International Nuclear Information System (INIS)

    Rindahl, G.; Mark, N.K.F.; Meyer, G.

    2006-01-01

    The work on Virtual Reality (VR) tools for decommissioning planning, dose estimation and work management started at the Norwegian Institute for Energy Technology (IFE) in 1999 in the VR dose project with Japan Nuclear Cycle development institute (JNC), now JAEA. The main aim of this effort has been to help minimize workers' radiation exposure, as well as help to achieve more efficient use of human resources. VR dose is now used in the decommissioning of one of JNC's reactors, the Fugen Nuclear Power Station. This VR decommissioning project has later resulted in a series of projects and applications. In addition to decommissioning, IFE also put great focus on two other branches of VR tools, namely tools for knowledge management, training and education in operating facilities and tools for control room design. During the last years, this work, beginning at different ends, has been converging more and more towards VR technology for use through out the life cycle of a facility. A VR training simulator for a refuelling machine of the Leningrad NPP (LNPP) developed in cooperation with the Russian Research Centre Kurchatov Institute (RRC KI) is now planned to be used in connection with the decommissioning of the three intact reactors at Chernobyl in Ukraine. In this paper we describe experiences from use of VR in decommissioning processes, as well as results from bringing the VR technology initially developed for planned or productive facilities into the decommissioning toolbox. (author)

  4. Marketing Plan: Tukkanuotta Rauma

    OpenAIRE

    Hyrsky, Antti

    2012-01-01

    The purpose of this thesis was to make a marketing plan and a brand new website for a hair saloon. The marketing plan is based on the 7p’s of the extended or service marketing mix. The emphasis is on the parts of promotion and price. The thesis outlines the theory of marketing mix and applies it to the case. The second part of the thesis is a new website. The website was done using Joomla! 1.7 content management system. This platform was selected in order to make future updating and m...

  5. Environmental Planning and Ecology Program Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2008-01-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  6. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ''Partnership in Environmental Excellence'' formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex

  7. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  8. A Tale of Two Regions: Landscape Ecological Planning for Shale Gas Energy Futures

    Science.gov (United States)

    Murtha, T., Jr.; Schroth, O.; Orland, B.; Goldberg, L.; Mazurczyk, T.

    2015-12-01

    As we increasingly embrace deep shale gas deposits to meet global energy demands new and dispersed local and regional policy and planning challenges emerge. Even in regions with long histories of energy extraction, such as coal, shale gas and the infrastructure needed to produce the gas and transport it to market offers uniquely complex transformations in land use and landcover not previously experienced. These transformations are fast paced, dispersed and can overwhelm local and regional planning and regulatory processes. Coupled to these transformations is a structural confounding factor. While extraction and testing are carried out locally, regulation and decision-making is multilayered, often influenced by national and international factors. Using a geodesign framework, this paper applies a set of geospatial landscape ecological planning tools in two shale gas settings. First, we describe and detail a series of ongoing studies and tools that we have developed for communities in the Marcellus Shale region of the eastern United States, specifically the northern tier of Pennsylvania. Second, we apply a subset of these tools to potential gas development areas of the Fylde region in Lancashire, United Kingdom. For the past five years we have tested, applied and refined a set of place based and data driven geospatial models for forecasting, envisioning, analyzing and evaluating shale gas activities in northern Pennsylvania. These models are continuously compared to important landscape ecological planning challenges and priorities in the region, e.g. visual and cultural resource preservation. Adapting and applying these tools to a different landscape allow us to not only isolate and define important regulatory and policy exigencies in each specific setting, but also to develop and refine these models for broader application. As we continue to explore increasingly complex energy solutions globally, we need an equally complex comparative set of landscape ecological

  9. 40 CFR 93.106 - Content of transportation plans and timeframe of conformity determinations.

    Science.gov (United States)

    2010-07-01

    ... transportation analysis in use by the MPO. Transit facilities, equipment, and services envisioned for the future... plans which meet those requirements. Otherwise, the transportation system envisioned for the future must... determination; (iv) The last year of the transportation plan's forecast period must be a horizon year; and (v...

  10. Study of Hadron-Nucleus and Nucleus-Nucleus Collisions at the CERN SPS: Early Post-LS2 Measurements and Future Plans

    CERN Document Server

    Aduszkiewicz, A

    2018-01-01

    NA61/SHINE proposes to continue measurements of hadron and nuclear fragment production properties in reactions induced by hadron and ion beams. The new measurements requested will provide unique data on (i) charm hadron production in Pb+Pb collisions for heavy ion physics, (ii) nuclear fragmentation cross sections for cosmic ray physics and (iii) hadron production in hadron-induced reactions for neutrino physics. The measurements require upgrades of the NA61/SHINE detector that shall increase the data taking rate to about 1 kHz. NA61/SHINE is the only experiment which can conduct the measurements in the near future. In this document the beam request for the early post-LS2 measurements in 2022 is presented. Plans for a continuation of measurements are also discussed.

  11. The Use of Planning in English and German (NRW) Geography School Textbooks

    Science.gov (United States)

    Maier, Veit; Budke, Alexandra

    2016-01-01

    Although it is not possible to predict the future, at least some ideas can be developed through planning. Geography focuses on current social, environmental and spatial problems; however, it should, at the same time, teach us to plan its future handling. At school, this is a responsible role for the subject geography. This article compares how…

  12. Lithuanian female physicists: Reality and plans for the future

    Science.gov (United States)

    Šatkovskienė, Dalia; Giriunienė, Ramutė; Ruželė, Živilė; Rutkunienė, Živilė

    2013-03-01

    Changes in the issue of women in physics in Lithuanian in the three years since the 3rd IUPAP International Conference on Women in Physics are discussed on the basis of statistics as well as an exploratory study recently conducted among women physicists. The situation has changed slowly since 2008. However, the study shows that women physicists more clearly understand the inequities and the need for changes, including an active European Union mainstreaming policy targeted to ensure gender equality in the sciences, which gives hope for accelerating changes. Continued plans for improving women physicists' situation in Lithuania are discussed.

  13. Managing wastes from the atomic age and into the future: programs, plans and challenges

    International Nuclear Information System (INIS)

    Miller, J.M.

    2011-01-01

    implementation schedules to address the current waste inventory and future wastes from both AECL's operational and decommissioning activities. This paper provides an overview of AECL's waste management practices, AECL's low- and intermediate-level waste inventory, current activities for the management of those wastes, and the plans for moving forward. (author)

  14. Influencing the future of AGU

    Science.gov (United States)

    McPhaden, Michael; Finn, Carol; McEntee, Chris

    2012-01-01

    Steve Jobs, visionary cofounder of Apple, Inc., once said, “Everyone here has the sense that right now is one of those moments when we are influencing the future.” This statement aptly describes AGU at this time as the Board of Directors and the Council continue to influence the future in exciting ways by advancing our strategic plan (http://www.agu.org/about/mission.shtml). Both governing bodies held meetings in San Francisco immediately preceding the 2011 AGU Fall Meeting. The agendas for both meetings, along with the key outcomes, are posted on AGU's Web site (http://www.agu.org/about/governance/).

  15. Project Cost Estimation for Planning

    Science.gov (United States)

    2010-02-26

    For Nevada Department of Transportation (NDOT), there are far too many projects that ultimately cost much more than initially planned. Because project nominations are linked to estimates of future funding and the analysis of system needs, the inaccur...

  16. Future Population Trends in China: 2005-2050

    OpenAIRE

    Chen Wei; Liu Jinju

    2009-01-01

    Using China's 2000 census data, this paper conducts population projection under different fertility scenarios to gauge the likely trends in China's future population change. The range of fertility assumptions captures the uncertainty of current fertility estimates as well as the likely trends under the family planning policy and economic development. Only one mortality scenario is applied and net international migration is assumed to be null in the population projection. Future life tables ar...

  17. Mississippi National River and Recreation Area Water Trail Plan.

    Science.gov (United States)

    2017-05-05

    The Water Trail Plan describes the current conditions of and future plans for the Mississippi National River and Recreation Area (NRRA), a 72-mile stretch of the Mississippi River running through the Twin Cities region of Minnesota. In 2012, the NRRA...

  18. Argonne National Laboratory institutional plan FY 2001--FY 2006.

    Energy Technology Data Exchange (ETDEWEB)

    Beggs, S.D.

    2000-12-07

    This Institutional Plan describes what Argonne management regards as the optimal future development of Laboratory activities. The document outlines the development of both research programs and support operations in the context of the nation's R and D priorities, the missions of the Department of Energy (DOE) and Argonne, and expected resource constraints. The Draft Institutional Plan is the product of many discussions between DOE and Argonne program managers, and it also reflects programmatic priorities developed during Argonne's summer strategic planning process. That process serves additionally to identify new areas of strategic value to DOE and Argonne, to which Laboratory Directed Research and Development funds may be applied. The Draft Plan is provided to the Department before Argonne's On-Site Review. Issuance of the final Institutional Plan in the fall, after further comment and discussion, marks the culmination of the Laboratory's annual planning cycle. Chapter II of this Institutional Plan describes Argonne's missions and roles within the DOE laboratory system, its underlying core competencies in science and technology, and six broad planning objectives whose achievement is considered critical to the future of the Laboratory. Chapter III presents the Laboratory's ''Science and Technology Strategic Plan,'' which summarizes key features of the external environment, presents Argonne's vision, and describes how Argonne's strategic goals and objectives support DOE's four business lines. The balance of Chapter III comprises strategic plans for 23 areas of science and technology at Argonne, grouped according to the four DOE business lines. The Laboratory's 14 major initiatives, presented in Chapter IV, propose important advances in key areas of fundamental science and technology development. The ''Operations and Infrastructure Strategic Plan'' in Chapter V includes

  19. Maximising the Effectiveness of a Scenario Planning Process: Tips for Scenario Planners in Higher Education

    Science.gov (United States)

    Sayers, Nicola

    2011-01-01

    Scenario planning is a tool which can help organisations and people to think about, and plan for, the long-term future. In basic terms, it involves creating a number of in-depth scenarios (stories), each of which tells of a different possible future for an organisation or issue, and considering how each different future might influence…

  20. Fuzzy Quantitive Strategic Planning Matrix dalam Perencanaan Strategi Perguruan Tinggi

    Directory of Open Access Journals (Sweden)

    Fera Tri Wulandari

    2016-01-01

    Full Text Available The strategic plan helps the college in determining the direction of the college to achieve a desired future and provides a framework for achieving competitive advantage. In the strategic planning process, the selection of strategies is essential if universities do not have the resources to implement all the strategies. FQSPM designed to determine the relative attractiveness of each alternative strategy using triangular fuzzy numbers. Merger FQSPM and FTOPSIS used in the decision-making process on strategic planning by a college to conduct the election strategy based on the results of internal and external analysis. The results of the strategic planning helps colleges determine the direction to achieve the desired future so that colleges can anticipate environmental changes and predict the risk while continuing to adjust the action with the aim to be achieved college. Keywords: Strategic Planning; SWOT; Fuzzy QSPM; Fuzzy TOPSIS

  1. Nuclear power - assures the energy future. V. 2

    International Nuclear Information System (INIS)

    1982-01-01

    Papers presented at the conference surveyed the present status of nuclear projects and future nuclear power plans, the export of electricity and technology, Canada's nuclear industry, and innovative nuclear opportunities

  2. Marketing: Realistic Tips for Planning and Implementation in Special Libraries.

    Science.gov (United States)

    Kassel, Amelia

    2002-01-01

    Discusses the need for special libraries to have a marketing plan in order to increase support and plan for the future. Topics include finding the time; budgets and marketing; promoting library services; the use of outside consultants; making market planning a continuous process; and marketing efforts at product shows. (LRW)

  3. Big Pylons: Mixed signals for transmission. Spatial planning for energy distribution

    International Nuclear Information System (INIS)

    Ritchie, Heather; Hardy, Maelíosa; Lloyd, M. Greg; McGreal, Stanley

    2013-01-01

    The effective delivery of a sustainable energy future raises many challenges in relation to energy distribution where a new understanding of spatial planning is needed in relation to energy production, consumption and storage. Understanding the emergent low carbon energy economy in terms of its production, distribution and consumption characteristics has prompted a deliberate spatial planning interest. This paper examines issues relating to spatial planning, regulation, political legitimacy and accountability in the current and future systems for energy distribution. In particular it examines the Beauly Denny public inquiry in Scotland as a case study in terms of demonstrating the changing state–market–civil relations in an energy transition context with differentiated values and interests. The case study highlights implications for the regulation in the public interest of highly contested spaces, places and development schemes, together with a synopsis of government structure and change that is influencing the future of spatial planning and energy distribution in particular. - Highlights: • We examine links between spatial planning and regulation of energy distribution. • We examine the Beauly Denny public inquiry in Scotland. • We highlight challenges surrounding the development of a resilient energy system. • We highlight links between spatial planning and infrastructural development

  4. Cathode R and D for future light sources

    Energy Technology Data Exchange (ETDEWEB)

    Dowell, D.H., E-mail: dowell@slac.stanford.ed [SLAC National Accelerator Laboratory, 2575 Sand Hill Road, Menlo Park, CA 94025 (United States); Bazarov, I.; Dunham, B. [Cornell University, Cornell Laboratory for Accelerator-Based Sciences and Education (CLASSE) Wilson Laboratory, Cornell University, Ithaca, NY 14853 (United States); Harkay, K. [Argonne National Laboratory, 9700 S. Cass Avenue, Argonne, Il 60439 (United States); Hernandez-Garcia, C. [Thomas Jefferson Laboratory, 12000 Jefferson Ave, Free Electron Laser Suite 19 Newport News, VA 23606 (United States); Legg, R. [University of Wisconsin, SRC, 3731 Schneider Dr., Stoughton, WI 53589 (United States); Padmore, H. [Lawrence Berkeley National Laboratory, 1 Cyclotron Rd, Berkeley, CA 94720 (United States); Rao, T.; Smedley, J. [Brookhaven National Laboratory, 20 Technology Street, Bldg. 535B, Brookhaven National Laboratory Upton, NY 11973 (United States); Wan, W. [Lawrence Berkeley National Laboratory, 1 Cyclotron Rd, Berkeley, CA 94720 (United States)

    2010-10-21

    This paper reviews the requirements and current status of cathodes for accelerator applications, and proposes a research and development plan for advancing cathode technology. Accelerator cathodes need to have long operational lifetimes and produce electron beams with a very low emittance. The two principal emission processes to be considered are thermionic and photoemission with the photocathodes being further subdivided into metal and semi-conductors. Field emission cathodes are not included in this analysis. The thermal emittance is derived and the formulas used to compare the various cathode materials. To date, there is no cathode which provides all the requirements needed for the proposed future light sources. Therefore a three part research plan is described to develop cathodes for these future light source applications.

  5. Canada's green plan: Summary. Le plan vert du Canada: Resume

    Energy Technology Data Exchange (ETDEWEB)

    1990-01-01

    A summary is presented of Canada's Green Plan, a comprehensive action plan to ensure a healthy environment for the future. The plan defines targets and schedules which will drive federal environmental initiatives, and incorporates concepts of sustainable development. Elements of the plan include initiatives to combat and prevent water pollution; control ocean dumping; control smog-causing emissions; provide tighter air pollution standards; provide for sound waste management according to the principles of reduce, reuse, recycle, and recover; assess and control chemical wastes; sustain Canadian forests and maintain their diversity while shifting forest management from sustained yield to sustainable development; maintain and enhance environmental sustainability in the agro-food sector and the fishery sector; preserve and protect national parks and wildlife; and preserve and enhance the integrity, health, biodiversity and productivity of Arctic ecosystems. With respect to global-scale problems, measures will be taken to stabilize greenhouse gas emissions, limit acid rain-related emissions, and phase out the use of ozone-depleting substances. The plan also intends to improve Canada's capability to respond to environmental emergencies, improve environmental decision-making by strengthening and building of partnerships, promote environmental science research and development, and make effective and balanced use of enviromental laws, with market-based approaches for environmental protection.

  6. Canada's green plan - The second year. Summary

    International Nuclear Information System (INIS)

    1993-01-01

    Canada's Green Plan is the national strategy and action plan for sustainable development launched by the federal government. The Green Plan's goal is 'to secure for current and future generations a safe and healthy environment and a sound and prosperous economy.' It represents a fundamental shift in the way the federal government views economic development and environmental protection: they are inextricably linked; both are critical to the health and well-being of Canadians. Substantial development has been made in Canada, with advances being made on the Green Plan's short-term objectives and on our longer term priorities

  7. American’s Energy Future: An Analysis of the Proposed Energy Policy Plans in Presidential Election

    Directory of Open Access Journals (Sweden)

    Ming-Hsun Cheng

    2016-11-01

    Full Text Available As the leader of the largest economy, President of the United States has substantive influence on addressing climate change problems. However, a presidential election is often dominated by issues other than energy problems. This paper focuses on the 2016 presidential election, and examines the energy plans proposed by the leading Democrat and Republican candidates. Our data from the Iowa caucus survey in January 2016 suggests that voters were more concerned about terrorism and economic issues than environmental issues. We then compare the Democratic and Republican candidate’s view of America’s energy future, and evaluate their proposed renewable energy targets. We find that the view on renewable energy is polarized between Democratic and Republican candidates, while candidates from both parties agree on the need for energy efficiency. Results from our ordinal least squares regression models suggests that Democratic candidates have moderate to ambitious goals for developing solar and other renewables. The Republican candidates favor fossil fuels and they choose not to provide any specific target for developing renewable energy. In addition, this trend of party polarization has grown more significant when compared with the past three presidential elections. Our observation suggests that energy policies need to be discussed more often regarding the diversification and decarbonization of the nation’s energy system.

  8. Audit of Sandia Corporation`s pension plans and other prefunded benefits

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-06

    The audit disclosed that Sandia`s pension plans had $588.9 million in excess assets as of December 31, 1990, on a current value basis. If plan terminations and spin-offs occurred, at least $408.8 million of this amount could be returned to the Government without affecting the pension benefits that Sandia employees and retirees have earned. We recommended that Albuquerque take the necessary action to reduce the excess assets in the pension plans and recover the Government`s share. However, Albuquerque disagreed with the recommendation. Albuquerque justified leaving the excess assets in the pension plans to fund future plan amendments; to avoid future funding contributions; to avoid the costs and time-consuming administrative steps associated with taking action; and to prevent damaging effects on employee morale. We analyzed these points, and concluded that they should not prevent the Department from initiating action to return excess assets to the Government. Actuarial analysis of the pension plans showed that, even if certain plan adjustments were made, the plans were overfunded by $256 million as of December 31, 1991 (on an actuarial value basis).

  9. A model for marketing planning for new products

    DEFF Research Database (Denmark)

    Martensen, Anne

    1993-01-01

    awareness model. The model can be used to generate improved marketing plans. In this connection, it is important that the model includes the marketing variables, for it is only in this way that the model can be used for marketing plan optimization. It is predicted that a future direction of development...... and use of sales forecasting models for new products will be within optimization of the marketing plan for launching a new product, and not only as a tool for forecasting sales for just one marketing plan....

  10. Long term generation planning in Cyprus

    Energy Technology Data Exchange (ETDEWEB)

    Kellas, A [Electricity Authority of Cyprus, Nicosia (Cyprus)

    1997-09-01

    The Wien Automatic System Planning (WASP) model has been used for carrying out generation expansion planning studies in Cyprus since many years. This paper focuses on the problems encountered in the use of the model and illustrates these problems by means of a case study, specially developed for this purpose. Suggestions for future improvements of the model are also made in this paper. (author). 2 figs, 10 tabs.

  11. Shuffling the Operational Deck: Future Requirements for the Plans, Operations, Medical Intelligence (POMI) Community

    Science.gov (United States)

    2011-04-11

    countries. PepsiCo, IBM and Nike are current examples of the so-called "game planning" approach to succession and talent ~anagement.21 Annual...Rothwell and associates, inc .; a full-service consulting Succession Planning finn provides other partner industries with the value of strategic

  12. A taxonomy of prospection: Introducing an organizational framework for future-oriented cognition

    Science.gov (United States)

    Szpunar, Karl K.; Spreng, R. Nathan; Schacter, Daniel L.

    2014-01-01

    Prospection—the ability to represent what might happen in the future—is a broad concept that has been used to characterize a wide variety of future-oriented cognitions, including affective forecasting, prospective memory, temporal discounting, episodic simulation, and autobiographical planning. In this article, we propose a taxonomy of prospection to initiate the important and necessary process of teasing apart the various forms of future thinking that constitute the landscape of prospective cognition. The organizational framework that we propose delineates episodic and semantic forms of four modes of future thinking: simulation, prediction, intention, and planning. We show how this framework can be used to draw attention to the ways in which various modes of future thinking interact with one another, generate new questions about prospective cognition, and illuminate our understanding of disorders of future thinking. We conclude by considering basic cognitive processes that give rise to prospective cognitions, cognitive operations and emotional/motivational states relevant to future-oriented cognition, and the possible role of procedural or motor systems in future-oriented behavior. PMID:25416592

  13. Writing a successful business plan.

    Science.gov (United States)

    Haag, A B

    1997-01-01

    1. In creating and building a business, the entrepreneur assumes all the responsibilities for its development and management, as well as the risks and risks and rewards. Many businesses do not survive because business owners fail to develop an effective plan. 2. The business plan focuses on major areas of concern and their contribution to the success of a new business. The finished product communicates the product/service to others and provides the basis for the financial proposal. 3. Planning helps identify customers, market area, pricing strategy, and competitive conditions. It aids in decision making and is an essential guide for operating a business successfully and measuring progress. 4. The business plan not only serves as a mechanism for obtaining any needed financial resources, but also indicates the future direction of the company.

  14. The ultimate uncertainty--intergenerational planning.

    Science.gov (United States)

    Starr, C

    2000-12-01

    The philosophic and practical aspects of intergenerational planning for a 50-100-year time frame are reviewed, with recognition of its speculative quality. Society's near term choice of future physical pathways based on comparative quantitative benefit/cost/risk analyses of alternatives is usually modified by the intervention of a variety of time-dependent, nontechnical value systems. Further, the continuous competition among society's disparate technical systems, capital investment choices, and planning objectives all contribute to the uncertainty of the intergenerational outcome of any plan. Nevertheless, the quantitative planning process provides an essential base. Benefit/cost/risk projections are discussed for both the case with a historical database and the case without such a historical base. The end-objectives and continuous nature of such benefit/cost/risk analyses are described.

  15. Middle East physics collaboration plans for the future

    CERN Multimedia

    CERN Bulletin

    2011-01-01

    The SESAME initiative, the Synchrotron-light for Experimental Science and Applications in the Middle East, is making progress. At a recent SESAME Council meeting at the end of May, Jordan, Iran and Israel confirmed their cash contributions to the project’s storage ring. The Palestinian Authority and Pakistan have confirmed their in-kind support and Egypt and Turkey are taking steps to allow their participation. Technically planned to start operation in 2015, SESAME has begun to show significant potential as a science for peace initiative in the Middle East.   The SESAME site in Allaan, Jordan.                   (© SESAME) Jordan has provided the land and an elegant building that will house the accelerator complex and associated infrastructure; a number of states, organizations and synchrotron light laboratories have donated the injector and booster, beam lines or components, support for infras...

  16. Langley Research Center Utility Risk from Future Climate Change

    Science.gov (United States)

    De Young, Russell J.; Ganoe, Rene

    2015-01-01

    The successful operation of NASA Langley Research Center (LaRC) depends on services provided by several public utility companies. These include Newport News Waterworks, Dominion Virginia Power, Virginia Natural Gas and Hampton Roads Sanitation District. LaRC's plan to respond to future climate change should take into account how these companies plan to avoid interruption of services while minimizing cost to the customers. This report summarizes our findings from publicly available documents on how each company plans to respond. This will form the basis for future planning for the Center. Our preliminary findings show that flooding and severe storms could interrupt service from the Waterworks and Sanitation District but the potential is low due to plans in place to address climate change on their system. Virginia Natural Gas supplies energy to produce steam but most current steam comes from the Hampton trash burning plant, thus interruption risk is low. Dominion Virginia Power does not address climate change impacts on their system in their public reports. The potential interruption risk is considered to be medium. The Hampton Roads Sanitation District is projecting a major upgrade of their system to mitigate clean water inflow and infiltration. This will reduce infiltration and avoid overloading the pump stations and treatment plants.

  17. Facility planning and site development

    International Nuclear Information System (INIS)

    Reisman, R.C.; Handmaker, H.

    1986-01-01

    Planning for a magnetic resonance imaging (MRI) facility should provide for the efficient operation of current and future MRI devices and must also take into consideration a broad range of general planning principles. Control of budgeted facility costs and construction schedules is of increasing importance due to the magnitude of expense of MRI facility development as well as the need to protect institutional or entrepreneurial investment. In a competitive environment facility costs may be the determining factor in a project's success

  18. Strategic Planning in Education: A Guide for Policymakers.

    Science.gov (United States)

    Cooper, Harry A.

    As defined in chapter I of this guide for policymakers, strategic planning is the method by which an organization identifies relevant trends in its environment, analyzes their potential implications, and projects an integrated strategy to address these future events and their contingencies. This process differs from formalized planning, based on…

  19. The Submillimeter Array – current status and future plans

    Science.gov (United States)

    Blundell, Raymond

    2018-01-01

    The current SMA receiver systems were designed in the mid-1990s and have been operating for more than fifteen years. With regular upgrades to receivers, deployment of the SWARM correlator, expansion of the IF signal transport bandwidth via improvements to the analog IF signal processing hardware, and many other enhancements, the SMA currently greatly outperforms its original specifications in terms of sensitivity, instantaneous bandwidth, and availability of observing modes such as full-Stokes polarization and dual frequency operation.We have recently started to implement a three-year instrument upgrade plan, which we are calling the wSMA. The wSMA will offer even wider bandwidth operation than the current SMA and improved sensitivity. The major subsystems that will form the wSMA include significantly improved, dual polarization receiver cartridges housed in a new cryostat; local oscillator units incorporating modern mm-wave technology; an upgraded signal transmission system; and a further expansion of the SWARM correlator. The cryostat will be cooled by a low-maintenance pulse-tube cryocooler. Two dual-polarization receiver cartridges will cover approximately the same sky frequencies as the current receiver sets; the low-band receiver will be fed by an LO unit covering 210-270 GHz, and the high-band receiver will be fed by an LO covering 280-360 GHz. With a receiver IF band of 4-20 GHz, this will enable continuous sky frequency coverage from 190 GHz to 380 GHz.Details of the upgrade plans will be presented together with a discussion of scientific opportunities afforded by this upgrade, which, once implemented, will enable the SMA to continue to produce the highest quality science throughout the next decade.

  20. International Photovoltaic Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Costello, D.; Koontz, R.; Posner, D.; Heiferling, P.; Carpenter, P.; Forman, S.; Perelman, L.

    1979-12-01

    The International Photovoltaics Program Plan is in direct response to the Solar Photovoltaic Energy Research, Development, and Demonstration Act of 1978 (PL 95-590). As stated in the Act, the primary objective of the plan is to accelerate the widespread use of photovoltaic systems in international markets. Benefits which could result from increased international sales by US companies include: stabilization and expansion of the US photovoltaic industry, preparing the industry for supplying future domestic needs; contribution to the economic and social advancement of developing countries; reduced world demand for oil; and improvements in the US balance of trade. The plan outlines programs for photovoltaic demonstrations, systems developments, supplier assistance, information dissemination/purchaser assistance, and an informaion clearinghouse. Each program element includes tactical objectives and summaries of approaches. A program management office will be established to coordinate and manage the program plan. Although the US Department of Energy (DOE) had the lead responsibility for preparing and implementing the plan, numerous federal organizations and agencies (US Departments of Commerce, Justice, State, Treasury; Agency for International Development; ACTION; Export/Import Bank; Federal Trade Commission; Small Business Administration) were involved in the plan's preparation and implementation.

  1. Projecting Future Sea Level Rise for Water Resources Planning in California

    Science.gov (United States)

    Anderson, J.; Kao, K.; Chung, F.

    2008-12-01

    Sea level rise is one of the major concerns for the management of California's water resources. Higher water levels and salinity intrusion into the Sacramento-San Joaquin Delta could affect water supplies, water quality, levee stability, and aquatic and terrestrial flora and fauna species and their habitat. Over the 20th century, sea levels near San Francisco Bay increased by over 0.6ft. Some tidal gauge and satellite data indicate that rates of sea level rise are accelerating. Sea levels are expected to continue to rise due to increasing air temperatures causing thermal expansion of the ocean and melting of land-based ice such as ice on Greenland and in southeastern Alaska. For water planners, two related questions are raised on the uncertainty of future sea levels. First, what is the expected sea level at a specific point in time in the future, e.g., what is the expected sea level in 2050? Second, what is the expected point of time in the future when sea levels will exceed a certain height, e.g., what is the expected range of time when the sea level rises by one foot? To address these two types of questions, two factors are considered: (1) long term sea level rise trend, and (2) local extreme sea level fluctuations. A two-step approach will be used to develop sea level rise projection guidelines for decision making that takes both of these factors into account. The first step is developing global sea level rise probability distributions for the long term trends. The second step will extend the approach to take into account the effects of local astronomical tides, changes in atmospheric pressure, wind stress, floods, and the El Niño/Southern Oscillation. In this paper, the development of the first step approach is presented. To project the long term sea level rise trend, one option is to extend the current rate of sea level rise into the future. However, since recent data indicate rates of sea level rise are accelerating, methods for estimating sea level rise

  2. Advertising family planning in the press: direct response results from Bangladesh.

    Science.gov (United States)

    Harvey, P D

    1984-01-01

    In 1977 and again in 1982, a series of couponed ads were run in three major Bangladeshi newspapers to test the relative effectiveness of different family planning themes. The ads offered a free booklet about methods of family planning (1977) or "detailed information on contraceptives" (1982) in the context of family health, the wife's happiness, the children's future, and family economics. The most effective ads, by a highly significant margin, were those stressing the importance of family economics (food and shelter) and the children's (sons') future. The least effective ads stressed the benefits of family planning for the wife.

  3. Choosing the Future You Prefer. A Goal Setting Guide.

    Science.gov (United States)

    Lindaman, Edward B.; Lippitt, Ronald O.

    The guide, intended for group and organization leaders, presents activities and exercises to aid in personal and group goal-setting and planning for the future. The objective is to help groups choose goals which are sensitive to and oriented toward the evolving future with its rapid rate of change. The guide is presented in eight chapters.…

  4. The 2012 School Psychology Futures Conference: Accomplishments and next Steps

    Science.gov (United States)

    Jamruz-Smith, Susan; Harrison, Patti L.; Cummings, Jack A.

    2013-01-01

    The major national and international school psychology organizations hosted the 2012 School Psychology Futures Conference during the fall of 2012. The conference was designed to provide an opportunity for school psychologists to plan their future roles in better supporting children, families, and schools. The 2012 conference, titled "School…

  5. Piping research program plan

    International Nuclear Information System (INIS)

    1988-09-01

    This document presents the piping research program plan for the Structural and Seismic Engineering Branch and the Materials Engineering Branch of the Division of Engineering, Office of Nuclear Regulatory Research. The plan describes the research to be performed in the areas of piping design criteria, environmentally assisted cracking, pipe fracture, and leak detection and leak rate estimation. The piping research program addresses the regulatory issues regarding piping design and piping integrity facing the NRC today and in the foreseeable future. The plan discusses the regulatory issues and needs for the research, the objectives, key aspects, and schedule for each research project, or group of projects focussing of a specific topic, and, finally, the integration of the research areas into the regulatory process is described. The plan presents a snap-shot of the piping research program as it exists today. However, the program plan will change as the regulatory issues and needs change. Consequently, this document will be revised on a bi-annual basis to reflect the changes in the piping research program. (author)

  6. Rethinking Design and Urban Planning for the Cities of the Future

    Directory of Open Access Journals (Sweden)

    Thomas L. Saaty

    2017-08-01

    Full Text Available Growth of urban areas and abandonment of rural areas are phenomena that increase quickly. The main consequences of urbanization are pollution, consumption of resources and energy, waste dumps, and junk yards. These aspects require a better planning and design of European urban metropolitan areas, considering benefits, opportunities, costs and risks (B.O.C.R., derivable by urban transformations and available resources. The paper consists of five parts. The first part contains some reflections on consequences of urban sprawl. In the second part, some possible kinds of cities are discussed (sustainable city, smart city, and compact city. The third part briefly describes a multicriteria decision-making approach known as the ‘analytic hierarchy process’ to deal with complex decisions. In the fourth part, alternative city models are analyzed (compact city, elevated city, green house city, and water city. Finally, in the fifth part, the criteria selected for the planning and design of the alternative city models are used for the prioritization of some European cities.

  7. MINERVA - a multi-modal radiation treatment planning system

    Energy Technology Data Exchange (ETDEWEB)

    Wemple, C.A. E-mail: cew@enel.gov; Wessol, D.E.; Nigg, D.W.; Cogliati, J.J.; Milvich, M.L.; Frederickson, C.; Perkins, M.; Harkin, G.J

    2004-11-01

    Researchers at the Idaho National Engineering and Environmental Laboratory and Montana State University have undertaken development of MINERVA, a patient-centric, multi-modal, radiation treatment planning system. This system can be used for planning and analyzing several radiotherapy modalities, either singly or combined, using common modality independent image and geometry construction and dose reporting and guiding. It employs an integrated, lightweight plugin architecture to accommodate multi-modal treatment planning using standard interface components. The MINERVA design also facilitates the future integration of improved planning technologies. The code is being developed with the Java Virtual Machine for interoperability. A full computation path has been established for molecular targeted radiotherapy treatment planning, with the associated transport plugin developed by researchers at the Lawrence Livermore National Laboratory. Development of the neutron transport plugin module is proceeding rapidly, with completion expected later this year. Future development efforts will include development of deformable registration methods, improved segmentation methods for patient model definition, and three-dimensional visualization of the patient images, geometry, and dose data. Transport and source plugins will be created for additional treatment modalities, including brachytherapy, external beam proton radiotherapy, and the EGSnrc/BEAMnrc codes for external beam photon and electron radiotherapy.

  8. The strategies, experiences and future challenges of the information component in the Indonesian Family Planning Programme.

    Science.gov (United States)

    Suyono, H

    1988-12-01

    In 1957, the Indonesian Planned Parenthood Federation was established. In 1970, the National Family Planning Board (BKKBN) was created. The current contraceptive prevalence rate is 45-50%. The family planning program began with a health-oriented approach. To promote acceptance, religious leaders were asked to provide legitimacy to the program. Through their efforts, it became possible to include all the means and medication used for family planning services within the program. In developing an IEC strategy to encourage couples to accept family planning, 3 main factors were studied: 1) the types of innovations that were to be introduced, 2) the characteristics of the Indonesian community, and 3) the need for an IEC strategy to convey the programs messages the community and make the community itself the agent of the innovation being introduced. The elements of the strategy were introduced stage by stage to avoid unnecessary debate. Another strategic step was the introduction of family planning using a community approach. A 3rd strategic step was a shift from couples as family planning acceptors to the introduction of the norm of a small, happy, and prosperous family. The 1st stage, expansion of program coverage, 1) promoted the need for and desirability of family planning to make the small and happy family the norm and 2) supplied contraceptives and information about contraceptives throughout Indonesia. The 2nd stage, the program maintenance approach, included 1) an increase in the frequency of visits to villages by mobile family planning teams, 2) the integration of family planning activities with other health-related activities, and 3) giving people a wider choice of methods and helping them to choose the most suitable method for them. The 3rd stage made family planning a community activity, integrated within the economic and social fabric of community life. The general strategy of the IEC program is to make the various target groups full family planning

  9. Computing Division two-year operational plan, FY 1981-1982

    International Nuclear Information System (INIS)

    Euald, R.H.; Worlton, W.J.; McCormick, M.

    1981-02-01

    This report is a comprehensive planning guide for the Computing Division of the Los Alamos National Laboratory for fiscal years 1981 and 1982. Subjects discussed include critical issues, programmatic requiements, hardware plans, software projects, direct user services, research projects, and projections of future developments

  10. A Revenue Planning Tool for Charter School Operators

    Science.gov (United States)

    Keller, Eric; Hayes, Cheryl D.

    2009-01-01

    This revenue planning tool aims to help charter school operators develop a sound revenue base that can meet their school's current and future funding needs. It helps identify and assess potential public (federal, state, and local) and private funding sources. The tool incorporates a four-step revenue planning process which includes: (1)…

  11. A Comparative Study of the Determinants of Future Plans and Expectations of Business Students

    Science.gov (United States)

    Black, Gregory S.; Schofield, April L.

    2018-01-01

    Current university juniors and seniors have plans and expectations for after they graduate. In an effort to better understand these plans and expectations, the authors assessed a sample of 334 university students enrolled in business classes. The study examined the impact of three categories of independent variables--family influences, demographic…

  12. Healthcare succession planning: an integrative review.

    Science.gov (United States)

    Carriere, Brian K; Muise, Melanie; Cummings, Greta; Newburn-Cook, Chris

    2009-12-01

    Succession planning is a business strategy that has recently gained attention in the healthcare literature, primarily because of nursing shortage concerns and the demand for retaining knowledgeable personnel to meet organizational needs. Little research has been conducted in healthcare settings that clearly defines best practices for succession planning frameworks. To effectively carry out such organizational strategies during these challenging times, an integrative review of succession planning in healthcare was performed to identify consistencies in theoretical approaches and strategies for chief nursing officers and healthcare managers to initiate. Selected articles were compared with business succession planning to determine whether healthcare strategies were similar to best practices already established in business contexts. The results of this integrative review will aid leaders and managers to use succession planning as a tool in their recruitment, retention, mentoring, and administration activities and also provide insights for future development of healthcare succession planning frameworks.

  13. The ATLAS Trigger: Recent Experience and Future Plans

    CERN Document Server

    The ATLAS collaboration

    2009-01-01

    This paper will give an overview of the ATLAS trigger design and its innovative features. It will describe the valuable experience gained in running the trigger reconstruction and event selection in the fastchanging environment of the detector commissioning during 2008. It will also include a description of the trigger selection menu and its 2009 deployment plan from first collisions to the nominal luminosity. ATLAS is one of the two general-purpose detectors at the Large Hadron Collider (LHC). The trigger system needs to efficiently reject a large rate of background events and still select potentially interesting ones with high efficiency. After a first level trigger implemented in custom electronics, the trigger event selection is made by the High Level Trigger (HLT) system, implemented in software. To reduce the processing time to manageable levels, the HLT uses seeded, step-wise and fast selection algorithms, aiming at the earliest possible rejection of background events. The ATLAS trigger event selection...

  14. Long Term Planning at IQ Metal

    DEFF Research Database (Denmark)

    2017-01-01

    This is a Danish version. This case about long term planning at the owner-managed manufacturing firm IQ Metal shows how the future management and ownership may be organized to utilize owner assets and minimize roadblocks. Initially, the owner-manager Bo Fischer Larsen explains how he acquired...... a stake in 2007 in the company which at that time was named Braendstrup Maskinfabrik. He furthermore expalins how he has developed the company based on a strategic plan focusing on professionalization and outsourcing. Next, the video shows how to type Bo Fischer Larsen's replies to the questions...... in The Owner Strategy Map into the questionnaire available on www.ejerstrategi-kortet.dk. Lastly, the Owner Strategy Map's recommendation of how to organize the future management and ownership of IQ Metal is explained....

  15. Achievement and future plan on plutonium use in Japan

    International Nuclear Information System (INIS)

    Uematsu, Kunihiko

    1998-05-01

    The plutonium recycle option has been supported from the early stage of nuclear development by Japanese Government because of the very weak structure of energy supplying system. Power Reactor and Nuclear Fuel Development Corporation (PNC) has been developing the plutonium recycling technology such as fast breeder reactor, MOX fuel fabrication and reprocessing technologies based on the decision of the government. The paper describes the obtained result of technical development and the future R and D program in the field of plutonium recycle. (J.P.N.)

  16. Nuclear physics at PEP: First test and future plans

    International Nuclear Information System (INIS)

    Van Bibber, K.; Dietrich, F.S.; Melnikoff, S.O.

    1986-09-01

    A test run of internal target nuclear physics at the PEP storage ring is described. The Time Projection Chamber (TPC-2γ detector) was used to detect the inelastically scattered electron and complete hadronic final state in the interaction of 14.5 GeV electrons with D 2 , Ar and Xe gas targets. The data comprise mostly low-x low-Q 2 events, but some deep inelastic scattering as well. The future possibilities of a dedicated nuclear physics program at PEP are outlined. 15 refs., 25 figs

  17. Irradiation project of SiC/SiC fuel pin 'INSPIRE': Status and future plan

    International Nuclear Information System (INIS)

    Kohyama, Akira; Kishimoto, Hirotatsu

    2015-01-01

    After the March 11 Disaster in East-Japan, Research and Development towards Ensuring Nuclear Safety Enhancement for LWR becomes a top priority R and D in nuclear energy policy of Japan. The role of high temperature non-metallic materials, such as SiC/SiC, is becoming important for the advanced nuclear reactor systems. SiC fibre reinforced SiC composite has been recognised to be the most attractive option for the future, now, METI fund based project, INSPIRE, has been launched as 5-year termed project at OASIS in Muroran Institute of Technology aiming at early realisation of this system. INSPIRE is the irradiation project of SiC/SiC fuel pins aiming to accumulate material, thermal, irradiation effect data of NITE-SiC/SiC in BWR environment. Nuclear fuel inserted SiC/SiC fuel pins are planned to be installed in the Halden reactor. The project includes preparing the NITE-SiC/SiC tubes, joining of end caps, preparation of rigs to control the irradiation environment to BWR condition and the instruments to measure the condition of rigs and pins in operation. Also, basic neutron irradiation data will be accumulated by SiC/SiC coupon samples currently under irradiation in BR2. The output from this project may present the potentiality of NITE-SiC/SiC fuel cladding with the first stage fuel-cladding interaction. (authors)

  18. Future Directions in Parent Education Research.

    Science.gov (United States)

    Aaronson, May

    This paper suggests goals for future research programs in parent education. Suggestions include: (1) developing and replicating long-term studies of the effects of parent education, (2) examining the antecedents of adult behavior disorders to plan parenting programs that aim at preventing such disorders, (3) replacing deficit models of parenting…

  19. Special Needs: Planning for Adulthood (Videos)

    Medline Plus

    Full Text Available ... Fitness Diseases & Conditions Infections Drugs & Alcohol School & ... and opportunities available to them. While you help your tween or teen plan for the future, watch this video series together to learn about everything ...

  20. Uncertainty in spatial planning proceedings

    Directory of Open Access Journals (Sweden)

    Aleš Mlakar

    2009-01-01

    Full Text Available Uncertainty is distinctive of spatial planning as it arises from the necessity to co-ordinate the various interests within the area, from the urgency of adopting spatial planning decisions, the complexity of the environment, physical space and society, addressing the uncertainty of the future and from the uncertainty of actually making the right decision. Response to uncertainty is a series of measures that mitigate the effects of uncertainty itself. These measures are based on two fundamental principles – standardization and optimization. The measures are related to knowledge enhancement and spatial planning comprehension, in the legal regulation of changes, in the existence of spatial planning as a means of different interests co-ordination, in the active planning and the constructive resolution of current spatial problems, in the integration of spatial planning and the environmental protection process, in the implementation of the analysis as the foundation of spatial planners activities, in the methods of thinking outside the parameters, in forming clear spatial concepts and in creating a transparent management spatial system and also in the enforcement the participatory processes.

  1. Strategic planning features of subsurface management in Kemerovo Oblast

    Science.gov (United States)

    Romanyuk, V.; Grinkevich, A.; Akhmadeev, K.; Pozdeeva, G.

    2016-09-01

    The article discusses the strategic planning features of regional development based on the production and subsurface management in Kemerovo Oblast. The modern approach - SWOT analysis was applied to assess the regional development strategy. The estimation of regional development plan implementation was given for the foreseeable future.

  2. Evaluation of Mexico's 1975-2000 energy plan

    International Nuclear Information System (INIS)

    Bazan-Perkins, Sergio D.; Fernandez-Zayas, Jose L.

    2008-01-01

    The certainty and trustworthiness of a planning model can best be assessed when projections can be compared with actual developments. The ability to design scenarios and to evaluate demographic, economic and technological change is also increased with periodic comparisons between plans and actual facts. In 1976, the Mexican government published a 25 year power supply plan for the country, in which a development of non-fossil fuel plants was recommended, largely due to environmental considerations. It was proposed that the new demand should be met mainly with renewable energy sources and nuclear power. The study stated that hydrocarbons would reach a peak between 2003 and 2005, and that after this point the descent of fuel consumption would proceed at an increased velocity. Under this program, the dependence of Mexico on fuel for electricity would be gradually reduced as the 21st century progressed. The suggestion was not assumed by successive governments, and fossil fuel plants took the place of the proposed nuclear plants. However, the original 25 years power plan has proved to be quite accurate in its social and economic previsions, and allows the validation of a new, more powerful and reliable planning model. This paper presents the results of the validation of the model, as well as major considerations to be heeded in the future to increase certainty in further planning efforts. The projection of a better, more sustainable and reliable energy future is also proposed

  3. The Future School: Designing for Student Success.

    Science.gov (United States)

    Ruck, Gary

    1993-01-01

    Three themes of change in school planning are the future school, outsourcing, and the reconstruction of existing facilities to accommodate technological and philosophical potential. Describes the technology and the house concept at a middle school and renovations at an elementary school. (MLF)

  4. Interim Hanford Waste Management Technology Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Interim Hanford Waste Management Technology Plan (HWMTP) is a companion document to the Interim Hanford Waste Management Plan (HWMP). A reference plan for management and disposal of all existing and certain projected future radioactive Hanford Site Defense Wastes (HSDW) is described and discussed in the HWMP. Implementation of the reference plan requires that various open technical issues be satisfactorily resolved. The principal purpose of the HWMTP is to present detailed descriptions of the technology which must be developed to close each of the technical issues associated with the reference plan identified in the HWMP. If alternative plans are followed, however, technology development efforts including costs and schedules must be changed accordingly. Technical issues addressed in the HWMTP and HWMP are those which relate to disposal of single-shell tank wastes, contaminated soil sites, solid waste burial sites, double-shell tank wastes, encapsulated 137 CsCl and 90 SrF 2 , stored and new solid transuranic (TRU) wastes, and miscellaneous wastes such as contaminated sodium metal. Among the high priority issues to be resolved are characterization of various wastes including early determination of the TRU content of future cladding removal wastes; completion of development of vitrification (Hanford Waste Vitrification Plant) and grout technology; control of subsidence in buried waste sites; and development of criteria and standards including performance assessments of systems proposed for disposal of HSDW. Estimates of the technology costs shown in this report are made on the basis that all identified tasks for all issues associated with the reference disposal plan must be performed. Elimination of, consolidation of, or reduction in the scope of individual tasks will, of course, be reflected in corresponding reduction of overall technology costs

  5. Challenging Futures Studies To Enhance Participatory River Basin Management

    Science.gov (United States)

    van der Helm, R.

    Can the field of futures research help advance participatory management of river basins? This question is supposed to be answered by the present study of which this paper will mainly address the theoretical and conceptual point of view. The 2000 EU Framework directive on water emphasises at least two aspects that will mark the future management of river basins: the need for long-term planning, and a demand for participation. Neither the former nor the latter are new concepts as such, but its combination is in some sense revolutionary. Can long-term plans be made (and implemented) in a participative way, what tools could be useful in this respect, and does this lead to a satisfactory situation in terms of both reaching physical targets and enhancing social-institutional manageability? A possibly rich way to enter the discussion is to challenge futures research as a concept and a practice for enabling multiple stakeholders to design appropriate policies. Futures research is the overall field in which several methods and techniques (like scenario analysis) are mobilised to systematically think through and/or design the future. As such they have proven to be rich exercises to trigger ideas, stimulate debate and design desirable futures (and how to get there). More importantly these exercises have the capability to reconstitute actor relations, and by nature go beyond the institutional boundaries. Arguably the relation between futures research and the planning process is rather distant. Understandably commitments on the direct implementation of the results are hardly ever made, but its impact on changes in the capabilities of the network of actors involved may be large. As a hypothesis we consider that the distant link between an image of the future and the implementation in policy creates sufficient distance for actors to participate (in terms of responsibilities, legal constraints, etc.) and generate potentials, and enough degrees of freedom needed for a successful

  6. Hanford Environmental Management Program implementation plan

    International Nuclear Information System (INIS)

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs

  7. Business plan writing for physicians.

    Science.gov (United States)

    Cohn, Kenneth H; Schwartz, Richard W

    2002-08-01

    Physicians are practicing in an era in which they are often expected to write business plans in order to acquire, develop, and implement new technology or programs. This task is yet another reminder of the importance of business principles in providing quality patient care amid allocation of increasingly scarce resources. Unfortunately, few physicians receive training during medical school, residencies, or fellowships in performing such tasks. The process of writing business plans follows an established format similar to writing a consultation, in which the risks, benefits, and alternatives to a treatment option are presented. Although administrative assistance may be available in compiling business plans, it is important for physicians to understand the rationale, process, and pitfalls of business planning. Writing a business plan will serve to focus, clarify, and justify a request for scarce resources, and thus, increase its chance of success, both in terms of funding and implementation. A well-written business plan offers a plausible, coherent story of an uncertain future. Therefore, a business plan is not merely an exercise to obtain funding but also a rationale for investment that can help physicians reestablish leadership in health care.

  8. Continual improvement plan

    Science.gov (United States)

    1994-01-01

    NASA's approach to continual improvement (CI) is a systems-oriented, agency-wide approach that builds on the past accomplishments of NASA Headquarters and its field installations and helps achieve NASA's vision, mission, and values. The NASA of the future will fully use the principles of continual improvement in every aspect of its operations. This NASA CI plan defines a systematic approach and a model for continual improvement throughout NASA, stressing systems integration and optimization. It demonstrates NASA's constancy of purpose for improvement - a consistent vision of NASA as a worldwide leader in top-quality science, technology, and management practices. The CI plan provides the rationale, structures, methods, and steps, and it defines NASA's short term (1-year) objectives for improvement. The CI plan presents the deployment strategies necessary for cascading the goals and objectives throughout the agency. It also provides guidance on implementing continual improvement with participation from top leadership and all levels of employees.

  9. NASA strategic plan

    Science.gov (United States)

    1994-01-01

    The NASA Strategic Plan is a living document. It provides far-reaching goals and objectives to create stability for NASA's efforts. The Plan presents NASA's top-level strategy: it articulates what NASA does and for whom; it differentiates between ends and means; it states where NASA is going and what NASA intends to do to get there. This Plan is not a budget document, nor does it present priorities for current or future programs. Rather, it establishes a framework for shaping NASA's activities and developing a balanced set of priorities across the Agency. Such priorities will then be reflected in the NASA budget. The document includes vision, mission, and goals; external environment; conceptual framework; strategic enterprises (Mission to Planet Earth, aeronautics, human exploration and development of space, scientific research, space technology, and synergy); strategic functions (transportation to space, space communications, human resources, and physical resources); values and operating principles; implementing strategy; and senior management team concurrence.

  10. Incorporating climate change projections into riparian restoration planning and design

    Science.gov (United States)

    Perry, Laura G.; Reynolds, Lindsay V.; Beechie, Timothy J.; Collins, Mathias J.; Shafroth, Patrick B.

    2015-01-01

    Climate change and associated changes in streamflow may alter riparian habitats substantially in coming decades. Riparian restoration provides opportunities to respond proactively to projected climate change effects, increase riparian ecosystem resilience to climate change, and simultaneously address effects of both climate change and other human disturbances. However, climate change may alter which restoration methods are most effective and which restoration goals can be achieved. Incorporating climate change into riparian restoration planning and design is critical to long-term restoration of desired community composition and ecosystem services. In this review, we discuss and provide examples of how climate change might be incorporated into restoration planning at the key stages of assessing the project context, establishing restoration goals and design criteria, evaluating design alternatives, and monitoring restoration outcomes. Restoration planners have access to numerous tools to predict future climate, streamflow, and riparian ecology at restoration sites. Planners can use those predictions to assess which species or ecosystem services will be most vulnerable under future conditions, and which sites will be most suitable for restoration. To accommodate future climate and streamflow change, planners may need to adjust methods for planting, invasive species control, channel and floodplain reconstruction, and water management. Given the considerable uncertainty in future climate and streamflow projections, riparian ecological responses, and effects on restoration outcomes, planners will need to consider multiple potential future scenarios, implement a variety of restoration methods, design projects with flexibility to adjust to future conditions, and plan to respond adaptively to unexpected change.

  11. Planning, Anticipatory Systems, and Kinds of Actors

    Science.gov (United States)

    Jorna, René; van Wezel, Wout

    2002-09-01

    Anticipation and planning have much in common. Anticipation means being ahead of things. Planning means not only anticipating on things to come, but also trying to determine a course of action to reach a goal. Planning is investigated in many domains, for example, in economy, biology, and in the cognitive sciences. Each of these domains uses its own research methodologies, languages, ontologies, and models. Although there are many differences between the various approaches and models, there must of course also be similarities, since they all deal with establishing a future course of actions to reach a goal. We will compare several planning approaches on a number of aspects, e.g., the kind of entity that makes the plan (natural or artificial), whether the plan is executed by the planner or by another entity, representational issues, and the domain that the plan is executed in. Our article focuses on analytical dimensions in the extended field of planning. We do not discuss empirical results.

  12. Wind farm planning at the Gulf of Suez

    Energy Technology Data Exchange (ETDEWEB)

    Clausen, N E; Mortensen, N G; Hansen, J C [Risoe National Lab., Wind Energy Dept., Roskilde (Denmark); Clausager, I [Hedeselskabet A/S, Viborg (Denmark); Pagh Jensen, F [National Environmental Res., Copenhagen (Denmark); Georgy, L; Said, U S [New and Renewable Energy Authority, Egypt, (Egypt)

    2004-11-01

    The Wind Atlas for Egypt project is an element in a national effort to provide the best possible basis for planning of future environmentally sustainable development and utilization of wind energy resources and technology in Egypt. The present report compiles the data, information and recommendations available for planning of wind farm projects in the Gulf of Suez. (au)

  13. Legal issues in cash balance pension plan conversions.

    Science.gov (United States)

    Forman, J B

    2001-01-01

    Replacing a traditional pension with a cash balance plan raises a number of complicated and unsettled legal issues, including the protection of accrued benefits, the rate of benefit accrual, age discrimination and notice requirements. This article discusses those issues and concludes that routine conversions to cash balance plans appear to be legal both currently and into the foreseeable future.

  14. Special Needs: Planning for Adulthood (Videos)

    Medline Plus

    Full Text Available ... Illnesses & Injuries Relax & Unwind People, Places & Things That Help Feelings Expert Answers Q&A Movies & More for ... services, and opportunities available to them. While you help your tween or teen plan for the future, ...

  15. Special Needs: Planning for Adulthood (Videos)

    Medline Plus

    Full Text Available ... them. While you help your tween or teen plan for the future, watch this video series together ... Care for Your Child With Special Needs Special Education: Getting Help for Your Child Words to Know ( ...

  16. Future Mission Trends and their Implications for the Deep Space Network

    Science.gov (United States)

    Abraham, Douglas S.

    2006-01-01

    Planning for the upgrade and/or replacement of Deep Space Network (DSN) assets that typically operate for forty or more years necessitates understanding potential customer needs as far into the future as possible. This paper describes the methodology Deep Space Network (DSN) planners use to develop this understanding, some key future mission trends that have emerged from application of this methodology, and the implications of the trends for the DSN's future evolution. For NASA's current plans out to 2030, these trends suggest the need to accommodate: three times as many communication links, downlink rates two orders of magnitude greater than today's, uplink rates some four orders of magnitude greater, and end-to-end link difficulties two-to-three orders of magnitude greater. To meet these challenges, both DSN capacity and capability will need to increase.

  17. Selecting reasonable future land use scenarios

    Energy Technology Data Exchange (ETDEWEB)

    Allred, W.E.; Smith, R.W. [Idaho National Engineering Lab., Idaho Falls, ID (United States)

    1995-12-31

    This paper examines a process to help select the most reasonable future land use scenarios for hazardous waste and/or low-level radioactive waste disposal sites. The process involves evaluating future land use scenarios by applying selected criteria currently used by commercial mortgage companies to determine the feasibility of obtaining a loan for purchasing such land. The basis for the process is that only land use activities for which a loan can be obtained will be considered. To examine the process, a low-level radioactive waste site, the Radioactive Waste Management Complex at the Idaho National Engineering Laboratory, is used as an example. The authors suggest that the process is a very precise, comprehensive, and systematic (common sense) approach for determining reasonable future use of land. Implementing such a process will help enhance the planning, decisionmaking, safe management, and cleanup of present and future disposal facilities.

  18. Selecting reasonable future land use scenarios

    International Nuclear Information System (INIS)

    Allred, W.E.; Smith, R.W.

    1995-01-01

    This paper examines a process to help select the most reasonable future land use scenario for hazardous waste and/or low-level radioactive waste disposal sites. The process involves evaluating future land use scenarios ab applying selected criteria currently used by commercial mortgage companies to determine the feasibility of obtaining a loan for purchasing such land. The basis for the process is that only land use activities for which a loan can be obtained well be considered. To examine the process, a low-level radioactive waste site, the Radioactive Waste Management Complex at the Idaho National Engineering Laboratory, is used as an example. The authors suggest that the process is a very precise, comprehensive, and systematic approach for determining reasonable future use of land. Implementing such a process will help enhance the planning, decisionmaking, safe management, and cleanup of present and future disposal facilities

  19. Selecting reasonable future land use scenarios

    International Nuclear Information System (INIS)

    Allred, W.E.; Smith, R.W.

    1995-01-01

    This paper examines a process to help select the most reasonable future land use scenarios for hazardous waste and/or low-level radioactive waste disposal sites. The process involves evaluating future land use scenarios by applying selected criteria currently used by commercial mortgage companies to determine the feasibility of obtaining a loan for purchasing such land. The basis for the process is that only land use activities for which a loan can be obtained will be considered. To examine the process, a low-level radioactive waste site, the Radioactive Waste Management Complex at the Idaho National Engineering Laboratory, is used as an example. The authors suggest that the process is a very precise, comprehensive, and systematic (common sense) approach for determining reasonable future use of land. Implementing such a process will help enhance the planning, decisionmaking, safe management, and cleanup of present and future disposal facilities

  20. Curating NASA's Astromaterials Collections: Past, Present, and Future

    Science.gov (United States)

    Zeigler, Ryan

    2015-01-01

    Planning for the curation of samples from future sample return missions must begin during the initial planning stages of a mission. Waiting until the samples have been returned to Earth, or even when you begin to physically build the spacecraft is too late. A lack of proper planning could lead to irreversible contamination of the samples, which in turn would compromise the scientific integrity of the mission. For example, even though the Apollo missions first returned samples in 1969, planning for the curation facility began in the early 1960s, and construction of the Lunar Receiving Laboratory was completed in 1967. In addition to designing the receiving facility and laboratory that the samples will be characterized and stored in, there are many aspects of contamination that must be addressed during the planning and building of the spacecraft: planetary protection (both outbound and inbound); cataloging, documenting, and preserving the materials used to build spacecraft (also known as coupons); near real-time monitoring of the environment in which the spacecraft is being built using witness plates for critical aspects of contamination (known as contamination control); and long term monitoring and preservation of the environment in which the spacecraft is being built for most aspects of potential contamination through the use of witness plates (known as contamination knowledge). The OSIRIS REx asteroid sample return mission, currently being built, is dealing with all of these aspects of contamination in order to ensure they return the best preserved sample possible. Coupons and witness plates from OSIRIS REx are currently being studied and stored (for future studies) at the Johnson Space Center. Similarly, planning for the clean room facility at Johnson Space Center to house the OSIRIS-REx samples is well advanced, and construction of the facility should begin in early 2017 (despite a nominal 2023 return date for OSIRIS-REx samples). Similar development is being