WorldWideScience

Sample records for fuel reprocessing wastes

  1. Fuel reprocessing and waste management

    International Nuclear Information System (INIS)

    Philippone, R.L.; Kaiser, R.A.

    1989-01-01

    Because of different economic, social and political factors, there has been a tendency to compartmentalize the commercial nuclear power industry into separate power and fuel cycle operations to a greater degree in some countries compared to other countries. The purpose of this paper is to describe how actions in one part of the industry can affect the other parts and recommend an overall systems engineering approach which incorporates more cooperation and coordination between individual parts of the fuel cycle. Descriptions are given of the fuel cycle segments and examples are presented of how a systems engineering approach has benefitted the fuel cycle. Descriptions of fuel reprocessing methods and the waste forms generated are given. Illustrations are presented describing how reprocessing options affect waste management operations and how waste management decisions affect reprocessing

  2. Wastes from fuel reprocessing

    International Nuclear Information System (INIS)

    Eschrich, H.

    1976-01-01

    Handling, treatment, and interim storage of radioactive waste, problems confronted with during the reprocessing of spent fuel elements from LWR's according to the Purex-type process, are dealt with in detail. (HR/LN) [de

  3. Characteristics of radioactive waste streams generated in HTGR fuel reprocessing

    International Nuclear Information System (INIS)

    Lin, K.H.

    1976-01-01

    Results are presented of a study concerned with identification and characterization of radioactive waste streams from an HTGR fuel reprocessing plant. Approximate quantities of individual waste streams as well as pertinent characteristics of selected streams have been estimated. Most of the waste streams are unique to HTGR fuel reprocessing. However, waste streams from the solvent extraction system and from the plant facilities do not differ greatly from the corresponding LWR fuel reprocessing wastes

  4. Fuel reprocessing and waste management in the UK

    International Nuclear Information System (INIS)

    Heafield, W.; Griffin, N.L.

    1994-01-01

    The currently preferred route for the management of irradiated fuel in the UK is reprocessing. This paper, therefore, concentrates on outlining the policies, practices and achievement of British Nuclear Fuels plc (BNFL) associated with the management of its irradiated fuel facilities at Sellafield. The paper covers reprocessing and how the safe management of each of the major waste categories is achieved. BNFL's overall waste management policy is to develop, in close consultation with the regulatory authorities, a strategy to minimize effluent discharges and provide a safe, cost effective method of treating and preparing for disposal all wastes arising on the site

  5. Nuclear Fuel Reprocessing

    International Nuclear Information System (INIS)

    Simpson, Michael F.; Law, Jack D.

    2010-01-01

    This is a submission for the Encyclopedia of Sustainable Technology on the subject of Reprocessing Spent Nuclear Fuel. Nuclear reprocessing is the chemical treatment of spent fuel involving separation of its various constituents. Principally, it is used to recover useful actinides from the spent fuel. Radioactive waste that cannot be re-used is separated into streams for consolidation into waste forms. The first known application of nuclear reprocessing was within the Manhattan Project to recover material for nuclear weapons. Currently, reprocessing has a peaceful application in the nuclear fuel cycle. A variety of chemical methods have been proposed and demonstrated for reprocessing of nuclear fuel. The two most widely investigated and implemented methods are generally referred to as aqueous reprocessing and pyroprocessing. Each of these technologies is described in detail in Section 3 with numerous references to published articles. Reprocessing of nuclear fuel as part of a fuel cycle can be used both to recover fissionable actinides and to stabilize radioactive fission products into durable waste forms. It can also be used as part of a breeder reactor fuel cycle that could result in a 14-fold or higher increase in energy utilization per unit of natural uranium. Reprocessing can also impact the need for geologic repositories for spent fuel. The volume of waste that needs to be sent to such a repository can be reduced by first subjecting the spent fuel to reprocessing. The extent to which volume reduction can occur is currently under study by the United States Department of Energy via research at various national laboratories and universities. Reprocessing can also separate fissile and non-fissile radioactive elements for transmutation.

  6. Radioactive waste management in a fuel reprocessing facility in fiscal 1982

    International Nuclear Information System (INIS)

    1984-01-01

    In the fuel reprocessing facility of the Power Reactor and Nuclear Fuel Development Corporation, radioactive gaseous and liquid waste are released not exceeding the respective permissible levels. Radioactive concentrated solutions are stored at the site. Radioactive solid waste are stored appropriately at the site. In fiscal 1982, the released quantities of radioactive gaseous and liquid waste were both below the permissible levels. The results of radioactive waste management in the fuel reprocessing facility in fiscal 1982 are given in the tables: the released quantities of radioactive gaseous and liquid waste, the produced quantities of radioactive solid waste, and the stored quantities of radioactive concentrated solutions and of radioactive solid waste as of the end of fiscal 1982. (Mori, K.)

  7. HTGR fuel reprocessing technology

    International Nuclear Information System (INIS)

    Brooks, L.H.; Heath, C.A.; Shefcik, J.J.

    1976-01-01

    The following aspects of HTGR reprocessing technology are discussed: characteristics of HTGR fuels, criteria for a fuel reprocessing flowsheet; selection of a reference reprocessing flowsheet, and waste treatment

  8. Safety aspects in fuel reprocessing and radioactive waste management

    International Nuclear Information System (INIS)

    Agarwal, K.

    2018-01-01

    Nuclear energy is used for generation of electricity and for production of a wide range of radionuclides for use in research and development, healthcare and industry. Nuclear industry uses nuclear fission as source of energy so a large amount of energy is available from very small amount of fuel. As India has adopted c losed fuel cycle , spent nuclear fuel from nuclear reactor is considered as a material of resource and reprocessed to recovery valuable fuel elements. Main incentive of reprocessing is to use the uranium resources effectively by recovering/recycling Pu and U present in the spent fuel. This finally leads to a very small percentage of residual material present in spent nuclear fuel requiring their management as radioactive waste. Another special feature of the Indian Atomic Energy Program is the attention paid from the very beginning to the safe management of radioactive waste

  9. Radioactive wastes management in fiscal year 1983 in the fuel reprocessing plant

    International Nuclear Information System (INIS)

    1985-01-01

    In the nuclear fuel reprocessing plant of Power Reactor and Nuclear Fuel Development Corporation, the releases of radioactive gaseous and liquid wastes are so managed not to exceed the respective objective release levels. Of the radioactive liquid wastes, the high level concentrated wastes are stored in tanks and the low level wastes are stored in tanks or asphalt solidified. For radioactive solid wastes, high level solid wastes are stored in casks, low level solid wastes and asphalt solids in drums etc. The releases of radioactive gaseous and liquid wastes in the fiscal year 1983 were below the objective release levels. The radioactive wastes management in the fuel reprocessing plant in fiscal year 1983 is given in tables, the released quantities, the stored quantities, etc. (Mori, K.)

  10. Reprocessing and waste management in the UK

    International Nuclear Information System (INIS)

    Mogg, C.S.; Howarth, G.G.

    1987-01-01

    The paper concerns the progress in irradiated fuel reprocessing and waste management at the Sellafield site. Magnox fuel reprocessing is reviewed and oxide fuel reprocessing, due to commence in the early 1990s, is compared with existing practices. The article describes how magnox fuel reprocessing will be sustained by recent additions of new plant and shows how waste management downstream of reprocessing will be integrated across the Sellafield site. This article was first presented as a paper at the Waste Management '87 (1-5 March, Tucson, Arizona) conference. (author)

  11. EDRP public local inquiry, UKAEA/BNFL precognition on: PFR fuel reprocessing and radioactive waste management at Dounreay

    International Nuclear Information System (INIS)

    Pugh, O.

    1986-01-01

    A description of PFR fuel reprocessing at Dounreay is given, including brief details of fuel assembly transport, dismantling, chemical separation processes and reprocessing experience. The origin of radioactive wastes from PFR reprocessing, and the types of radioactive waste are outlined. The management of radioactive waste, including storage, treatment and disposal is described. (U.K.)

  12. Comparison of the waste management aspects of spent fuel disposal and reprocessing: post-disposal radiological impact

    International Nuclear Information System (INIS)

    Mobbs, S.F.; Harvey, M.P.; Martin, J.S.; Mayall, A.; Jones, M.E.

    1991-01-01

    A joint project involving contractors from France, Germany and the UK was set up by the Commission of the European Communities to assess the implications of two waste management options: the direct disposal of spent fuel and reprocessing of that fuel. This report describes the calculation of the radiological impact on the public of the management and disposal of the wastes associated with these two options. Six waste streams were considered: discharge of liquid reprocessing effluents, discharge of gaseous reprocessing effluents, disposal of low-level solid wastes arising from reprocessing, disposal of intermediate-level solid wastes arising from reprocessing, disposal of vitrified high-level reprocessing wastes, and direct disposal of spent fuel. The results of the calculations are in the form of maximum annual doses and risks to individual members of the public, and collective doses to four population groups, integrated over six time periods. These results were designed for input into a computer model developed by another contractor, Yard Ltd, which combines costs and impacts in a multi-attribute hierarchy to give an overall measure of the impact of a given option

  13. Reprocessing of spent nuclear fuel

    International Nuclear Information System (INIS)

    Kidd, S.

    2008-01-01

    The closed fuel cycle is the most sustainable approach for nuclear energy, as it reduces recourse to natural uranium resources and optimises waste management. The advantages and disadvantages of used nuclear fuel reprocessing have been debated since the dawn of the nuclear era. There is a range of issues involved, notably the sound management of wastes, the conservation of resources, economics, hazards of radioactive materials and potential proliferation of nuclear weapons. In recent years, the reprocessing advocates win, demonstrated by the apparent change in position of the USA under the Global Nuclear Energy Partnership (GNEP) program. A great deal of reprocessing has been going on since the fourties, originally for military purposes, to recover plutonium for weapons. So far, some 80000 tonnes of used fuel from commercial power reactors has been reprocessed. The article indicates the reprocessing activities and plants in the United Kigdom, France, India, Russia and USA. The aspect of plutonium that raises the ire of nuclear opponents is its alleged proliferation risk. Opponents of the use of MOX fuels state that such fuels represent a proliferation risk because the plutonium in the fuel is said to be 'weapon-use-able'. The reprocessing of used fuel should not give rise to any particular public concern and offers a number of potential benefits in terms of optimising both the use of natural resources and waste management.

  14. Removal of actinides from high-level wastes generated in the reprocessing of commercial fuels

    International Nuclear Information System (INIS)

    Bond, W.D.; Leuze, R.E.

    1975-09-01

    Progress is reported on a technical feasibility study of removing the very long-lived actinides (uranium, neptunium, plutonium, americium, and curium) from high-level wastes generated in the commercial reprocessing of spent nuclear fuels. The study was directed primarily at wastes from the reprocessing of light water reactor (LWR) fuels and specifically to developing satisfactory methods for reducing the actinide content of these wastes to values that would make 1000-year-decayed waste comparable in radiological toxicity to natural uranium ore deposits. Although studies are not complete, results thus far indicate the most promising concept for actinide removal includes both improved recovery of actinides in conventional fuel reprocessing and secondary processing of the high-level wastes. Secondary processing will be necessary for the removal of americium and curium and perhaps some residual plutonium. Laboratory-scale studies of separations methods that appear most promising are reported and conceptual flowsheets are discussed. (U.S.)

  15. Energies and media nr 30. Conditions for the nuclear sector. The fuel cycle and wastes. The usefulness of fuel reprocessing. Wastes

    International Nuclear Information System (INIS)

    2009-10-01

    After some comments on recent events in the nuclear sector in different countries (energy policy and projects in the USA, Europe, China, India, Russia), this issue proposes some explanations on the nuclear fuel cycle and on nuclear wastes: involved processes and products from mining to reprocessing and recycling, usefulness of reprocessing (future opportunities of fast neutron reactors, present usefulness of reprocessing with the recycling of separated fissile materials), impact of reprocessing on the environment in La Hague (gas and liquid releases, release standard definition), and the destiny of wastes

  16. Handling of spent nuclear fuel and final storage of nitrified high level reprocessing waste

    International Nuclear Information System (INIS)

    The following stages of handling and transport of the fuel on its way to final storage are dealt with in the report. 1) The spent nuclear fuel is stored at the power station or in the central fuel storage facility awaiting reprocessing. 2) The fuel is reprocessed, i.e. uranium, plutonium and waste are separated from each other. Reprocessing does not take place in Sweden. The highlevel waste is vitrified and can be sent back to Sweden in the 1990s. 3) Vitrified waste is stored for about 30 years awaiting deposition in the final repository. 4) The waste is encapsulated in highly durable materials to prevent groundwater from coming into contact with the waste glass while the radioactivity of the waste is still high. 5) The canisters are emplaced in a final repository which is built at a depth of 500 m in rock of low permeability. 6) All tunnels and shafts are filled with a mixture of clay and sand of low permeability. A detailed analysis of possible harmful effects resulting from normal acitivties and from conceivable accidents is presented in a special section. (author)

  17. Status of nuclear fuel reprocessing, spent fuel storage, and high-level waste disposal. Nuclear Fuel Cycle Committee, California Energy Resources Conservation and Development Commission. Draft report

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    An analysis of the current status of technologies and issues in the major portions of the back-end of the nuclear fuel cycle is presented. The discussion on nuclear fuel reprocessing covers the reprocessing requirement, reprocessing technology assessment, technology for operation of reprocessing plants, and approval of reprocessing plants. The chapter devoted to spent fuel storage covers the spent fuel storge problem, the legislative response, options for maintaining full core discharge capacity, prospective availability of alterntive storage options, and the outlook for California. The existence of a demonstrated, developed high-level waste disposal technology is reviewed. Recommendations for Federal programs on high-level waste disposal are made

  18. Environmental survey of the reprocessing and waste management portions of the LWR fuel cycle: a task force report

    Energy Technology Data Exchange (ETDEWEB)

    Bishop, W.P.; Miraglia, F.J. Jr. (eds.)

    1976-10-01

    This Supplement deals with the reprocessing and waste management portions of the nuclear fuel cycle for uranium-fueled reactors. The scope of the report is limited to the illumination of fuel reprocessing and waste management activities, and examination of the environmental impacts caused by these activities on a per-reactor basis. The approach is to select one realistic reprocessing and waste management system and to treat it in enough depth to illuminate the issues involved, the technology available, and the relationships of these to the nuclear fuel cycle in general and its environmental impacts.

  19. Environmental survey of the reprocessing and waste management portions of the LWR fuel cycle: a task force report

    International Nuclear Information System (INIS)

    Bishop, W.P.; Miraglia, F.J. Jr.

    1976-10-01

    This Supplement deals with the reprocessing and waste management portions of the nuclear fuel cycle for uranium-fueled reactors. The scope of the report is limited to the illumination of fuel reprocessing and waste management activities, and examination of the environmental impacts caused by these activities on a per-reactor basis. The approach is to select one realistic reprocessing and waste management system and to treat it in enough depth to illuminate the issues involved, the technology available, and the relationships of these to the nuclear fuel cycle in general and its environmental impacts

  20. Fuel handling, reprocessing, and waste and related nuclear data aspects

    International Nuclear Information System (INIS)

    Kuesters, H.; Lalovic, M.; Wiese, H.W.

    1979-06-01

    The essential processes in the out-of-pile nuclear fuel cycle are described, i.e. mining and milling of uranium ores, enrichment, fuel fabrication, storage, transportation, reprocessing of irradiated fuel, waste treatment and waste disposal. The aspects of radiation (mainly gammas and neutrons) and of heat production, as well as special safety considerations are outlined with respect to their potential operational impacts and long-term hazards. In this context the importance of nuclear data for the out-of-pile fuel cycle is discussed. Special weight is given to the LWR fuel cycle including recycling; the differences of LMFBR high burn-up fuel with large PuO 2 content are described. The HTR fuel cycle is discussed briefly as well as some alternative fuel cycle concepts. (orig.) [de

  1. Reprocessing of spent nuclear fuel

    International Nuclear Information System (INIS)

    Schmitt, D.

    1985-01-01

    How should the decision in favour of reprocessing and against alternative waste management concepts be judged from an economic standpoint. Reprocessing is not imperative neither for resource-economic reasons nor for nuclear energy strategy reasons. On the contrary, the development of an ultimate storage concept representing a real alternative promising to close, within a short period of time, the nuclear fuel cycle at low cost. At least, this is the result of an extensive economic efficiency study recently submitted by the Energy Economics Institute which investigated all waste management concepts relevant for the Federal Republic of Germany in the long run, i.e. direct ultimate storage of spent fuel elements (''Other waste disposal technologies'' - AE) as well as reprocessing of spent fuel elements where re-usable plutonium and uranium are recovered and radioactive waste goes to ultimate storage (''Integrated disposal'' - IE). Despite such fairly evident results, the government of the Federal Republic of Germany has favoured the construction of a reprocessing plant. From an economic point of view there is no final answer to the question whether or not the argumentation is sufficient to justify the decision to construct a reprocessing plant. This is true for both the question of technical feasibility and issues of overriding significance of a political nature. (orig./HSCH) [de

  2. The situation of radioactive waste management in the fuel reprocessing facility (for fiscal 1979)

    International Nuclear Information System (INIS)

    1981-01-01

    In the fuel reprocessing facility of Power Reactor and Nuclear Fuel Development Corporation (PNC), the release of radioactive gaseous and liquid wastes was so controlled as not to exceed the set standards. Of the radioactive liquid wastes, concentrated wastes and sludge are stored in tanks. Radioactive solid wastes are suitably stored in containers. The situation of radioactive waste management in the fuel reprocessing facility in fiscal 1979 (from April, 1979, to March, 1980) is presented on the basis of the radiation control report made by PNC. The release of radioactive gaseous and liquid wastes was below the set standards. The following data are given in tables: the released quantity of radioactive gaseous and liquid wastes, the cumulative stored amount of radioactive liquid wastes, the produced quantity and cumulative stored amount of radioactive solid wastes; (for reference) the released quantity of radioactive gaseous and liquid wastes in fiscal 1977, 1978 and 1979. (J.P.N.)

  3. Environmental control aspects for fabrication, reprocessing and waste disposal of alternative LWR and LMFBR fuels

    International Nuclear Information System (INIS)

    Nolan, A.M.; Lewallen, M.A.; McNair, G.W.

    1979-11-01

    Environmental control aspects of alternative fuel cycles have been analyzed by evaluating fabrication, reprocessing, and waste disposal operations. Various indices have been used to assess potential environmental control requirements. For the fabrication and reprocessing operations, 50-year dose commitments were used. Waste disposal was evaluated by comparing projected nuclide concentrations in ground water at various time periods with maximum permissible concentrations (MPCs). Three different fabrication plants were analyzed: a fuel fabrication plant (FFP) to produce low-activity uranium and uranium-thorium fuel rods; a plutonium fuel refabrication plant (PFRFP) to produce plutonium-uranium and plutonium-thorium fuel rods; and a uranium fuel refabrication plant (UFRFP) to produce fuel rods containing the high-activity isotopes 232 U and 233 U. Each plant's dose commitments are discussed separately. Source terms for the analysis of effluents from the fuel reprocessing plant (FRP) were calculated using the fuel burnup codes LEOPARD, CINDER and ORIGEN. Effluent quantities are estimated for each fuel type. Bedded salt was chosen for the waste repository analysis. The repository site is modeled on the Waste Isolation Pilot Program site in New Mexico. Wastes assumed to be stored in the repository include high-level vitrified waste from the FRP, packaged fuel residue from the FRP, and transuranic (TRU) contaminated wastes from the FFP, PFRFP, and UFRFP. The potential environmental significance was determined by estimating the ground-water concentrations of the various nuclides over a time span of a million years. The MPC for each nuclide was used along with the estimated ground-water concentration to generate a biohazard index for the comparison among fuel compositions

  4. Reprocessing of MTR fuel at Dounreay

    International Nuclear Information System (INIS)

    Hough, N.

    1997-01-01

    UKAEA at Dounreay has been reprocessing MTR fuel for over 30 years. During that time considerable experience has been gained in the reprocessing of traditional HEU alloy fuel and more recently with dispersed fuel. Latterly a reprocessing route for silicide fuel has been demonstrated. Reprocessing of the fuel results in a recycled uranium product of either high or low enrichment and a liquid waste stream which is suitable for conditioning in a stable form for disposal. A plant to provide this conditioning, the Dounreay Cementation Plant is currently undergoing active commissioning. This paper details the plant at Dounreay involved in the reprocessing of MTR fuel and the treatment and conditioning of the liquid stream. (author)

  5. Management of radioactive waste from reprocessing plants

    International Nuclear Information System (INIS)

    Kanwar Raj

    2010-01-01

    Reprocessing and recycling of both fissile and fertile components back into appropriate reactor systems is an integral part of three stage nuclear energy programme of India. Different steps involved in processing of spent nuclear fuel (SNF) are decladding, dissolution and recovery of fissile and fertile materials. Reprocessing of SNF is a complex process involving handling of large quantity of radioactive materials and processing chemicals. There are three reprocessing plants in operation in the country at Trombay, Tarapur and Kalpakkam. Out of these plants, Trombay reprocessing plant is engaged in reprocessing of SNF from research reactors and other two plants are processing of SNF from PHWRs. A facility is being built for reprocessing of thorium based spent fuel at BARC, Trombay based on the experience of pilot plant scale. Like other industrial activities of nuclear fuel cycle, fuel reprocessing facilities too generate various types of radioactive waste streams. These are generated in all the three physical forms namely solid, liquid and gas. These waste streams are primarily categorized on the basis of concentration of radionuclides, their half lives and toxicity. Management of these wastes aims at (a) recovery and recycle of useful materials, (b) concentration and confinement of radioactivity in inert and stable matrices, (c) minimization of final waste volume for disposal, (d) decontamination of effluents following ALARA principle and (e) minimization of radioactive discharge to the environment. The present paper outlines the salient features of management of different types of radioactive waste generated in reprocessing plants handling SNF from research reactors and PHWR

  6. Handling of spent nuclear fuel and final storage of vitrified high level reprocessing waste

    International Nuclear Information System (INIS)

    1978-01-01

    The report gives a general summary of the Swedish KBS-project on management and disposal of vitrified reprocessed waste. Its final aim is to demostrate that the means of processing and managing power reactor waste in an absolutely safe way, as stipulated in the Swedish so called Conditions Act, already exist. Chapters on Storage facility for spent fuel, Intermidiate storage of reprocessed waste, Geology, Final repository, Transportation, Protection, and Siting. (L.E.)

  7. Current Status of Spent Fast Reactor Fuel Reprocessing and Waste Treatment in Various Countries: United States of America

    International Nuclear Information System (INIS)

    2011-01-01

    Due to the previous strategic US decision on treating SNF as waste and not pursuing the reprocessing option, development work for the FR fuel cycle was only performed in a few laboratories, although interest is now increasing again. ORNL together with ANL have been influential in promoting the wider use of centrifugal contactors (favoured due to the high fissile content and decay power of FR fuel materials), associated remote handling systems and hardware prototypes for most unit operations in the reprocessing conceptual designs in the context of their development of the Consolidated Fuel Reprocessing Program. There is limited experience with reprocessing tests on the Fast Flux Text Facility (FFTF) MOX fuel. ORNL has undertaken small tests on laboratory scale dissolution and solvent extraction of MOX fuel irradiated to 220 GW/t HM burnup at around 2 kg batch scale [180-186]. The initiative called the breeder reprocessing engineering test (BRET) was started in the 1980s with a focus on the developmental activity of the US DOE to demonstrate breeder fuel reprocessing technology while closing the fuel cycle for the FFTF. The process was supposed to be installed at the existing Fuels and Materials Examination Facility (FMEF) at the Hanford Site, Richland, Washington. The major objectives of BRET were to: - Develop and demonstrate reprocessing technology and systems for breeder fuel; - Close the fuel cycle for the FFTF; - Provide an integrated test of breeder reactor fuel cycle technology - reprocessing, safeguards and waste management. The quest for pyrochemical alternatives to aqueous reprocessing has been under way in the USA since the late 1950s. Approaches examined at various levels of development and for a variety of fuels include alloy melting, FP volatilization and adsorption, fluoride and chloride volatility methods, redox solvent extractions between liquid salt and metal phases, precipitation and fractional crystallization, and electrowinning and electro

  8. Trends for minimization of radioactive waste arising from spent nuclear fuel reprocessing

    International Nuclear Information System (INIS)

    Polyakov, A.S.; Koltunov, V.S.; Marchenko, V.I.; Ilozhev, A.P.; Mukhin, I.V.

    2000-01-01

    Research and development of technologies for radioactive waste (RAW) minimization arising from spent nuclear fuel reprocessing are discussed. Novel reductants of Pu and Np ions, reagents of purification recycled extractant, possibility of the electrochemical methods are studied. The partitioning of high activity level waste are considered. Examples of microbiological methods decomposition of radioactive waste presented. (authors)

  9. Handling of spent nuclear fuel and final storage of vitrified high level reprocessing waste

    International Nuclear Information System (INIS)

    1978-01-01

    A summary of the planning of transportation and plant design in the Swedish KBS project on management and disposal reprocessed radioactive waste. It describes a transportation system, a central storage facility for used fuel elements, a plant for intermediate storage and encapsulation and a final repository for the vitrified waste. Accounts are given for the reprocessing and vitrification. The safety of the entire system is discussed

  10. Reprocessing of LEU silicide fuel at Dounreay

    International Nuclear Information System (INIS)

    Cartwright, P.

    1996-01-01

    UKAEA have recently reprocessed two LEU silicide fuel elements in their MTR fuel reprocessing plant at Dounreay. The reprocessing was undertaken to demonstrate UKAEA's commitment to the world-wide research reactor communities future needs. Reprocessing of LEU silicide fuel is seen as a waste treatment process, resulting in the production of a liquid feed suitable for conditioning in a stable form of disposal. The uranium product from the reprocessing can be used as a blending feed with the HEU to produce LEU for use in the MTR cycle. (author)

  11. Radioactive wastes from reprocessing plants

    International Nuclear Information System (INIS)

    Huppert, K.L.

    1977-01-01

    The lecture deals with definition, quantity and type of radioactive waste products occurring in a fuel reprocessing plant. Solid, liquid and gaseous fission and activation products are formed during the dissolution of the fuel and during the extraction process, and they must be separated from the fissionalble uranium and plutonium not spent. The chemical behaviour of these products (Zr, Ru, Np, gaseous substances, radiolysis products), which is sometimes very problematic, necessitates careful process control. However, the lifetime of nuclides is just as important for the conditions of the reprocessing procedure. The types of waste obtained after reprocessing are classified according to their state of aggregation and level of activity and - on the basis of the operational data of a prototype plant - they are quantitatively extrapolated for the operation of a large-scale facility of 1,400 tons of fuel annually. (RB) [de

  12. Power Reactor Fuel Reprocessing Plant-1: a stepping stone in Indian PHWR spent fuel reprocessing

    International Nuclear Information System (INIS)

    Pradhan, Sanjay; Dubey, K.; Qureshi, F.T.; Lokeswar, S.P.

    2017-01-01

    India has low reserves of uranium and high reserves of thorium. In order to optimize resource utilization India has adopted a closed fuel cycle to ensure long-term energy security. The optimum resource utilization is feasible only by adopting reprocessing, conditioning and recycle options. It is very much imperative to view spent fuel as a vital resource material and not a waste to be disposed off. Thus, spent nuclear fuel reprocessing forms an integral part of the Indian Nuclear Energy Programme. Aqueous reprocessing based on PUREX technology is in use for more than 50 years and has reached a matured status

  13. Legal problems connected with irradiated fuel reprocessing and its waste storage

    International Nuclear Information System (INIS)

    Nercy, B. de.

    1981-10-01

    In view of its nature, an irradiated nuclear fuel reprocessing operation -and the contracts implementing it between the reprocessor and the customer- raises certain difficult legal problems. This paper analyses this question from the legal viewpoint, in particular as regards nuclear fuel and material ownership and products or waste arising therefrom, as well as in the context of rules of international trade and non-proliferation standards. (NEA) [fr

  14. Spent fuel reprocessing past experience and future prospects

    International Nuclear Information System (INIS)

    Megy, J.

    1983-09-01

    A large experience has been gathered from the early fifties till now in the field of spent fuel reprocessing. As the main efforts in the world have been made for developping the reactors and the fuel fabrication industry to feed them, the spent fuel reprocessing activities came later and have not yet reached the industrial maturity existing to day for plants such as PWRs. But in the principal nuclear countries spent fuel reprocessing is to day considered as a necessity with two simultaneous targets: 1. Recovering the valuable materials, uranium and plutonium. 2. Conditionning the radioactive wastes to ensure safe definitive storage. The paper reviews the main steps: 1. Reprocessing for thermal reactor fuels: large plants are already operating or in construction, but in parallel a large effort of R and D is still under way for improvements. 2. The development of fast breeder plants implies associated fuel reprocessing facilities: pilot plants have demonstrated the closing of the cycle. The main difficulties encountered will be examined and particularly the importance of taking into account the problems of effluents processing and wastes storage [fr

  15. Corrosion control in nuclear fuel reprocessing

    International Nuclear Information System (INIS)

    Steele, D.F.

    1986-01-01

    This article looks in detail at tribology-related hazards of corrosion in irradiated fuel reprocessing plants and tries to identify and minimize problems which could contribute to disaster. First, the corrosion process is explained. Then the corrosion aspects at each of four stages in reprocessing are examined, with particular reference to oxide fuel reprocessing. The four stages are fuel receipt and storage, fuel breakdown and dissolution, solvent extraction and product concentration and waste management. Results from laboratory and plant corrosion trails are used at the plant design stage to prevent corrosion problems arising. Operational procedures which minimize corrosion if it cannot be prevented at the design stage, are used. (UK)

  16. Reprocessing of research reactor fuel the Dounreay option

    Energy Technology Data Exchange (ETDEWEB)

    Cartwright, P.

    1997-08-01

    Reprocessing is a proven process for the treatment of spent U/Al Research Reactor fuel. At Dounreay 12679 elements have been reprocessed during the past 30 years. For reactors converting to LEU fuel the uranium recovered in reprocessing can be blended down to less than 20% U{sub 235}, enrichment and be fabricated into new elements. For reactors already converted to LEU it is technically possible to reprocess spent silicide fuel to reduce the U{sub 235} burden and present to a repository only stable conditioned waste. The main waste stream from reprocessing which contains the Fission products is collected in underground storage tanks where it is kept for a period of at least five years before being converted to a stable solid form for return to the country of origin for subsequent storage/disposal. Discharges to the environment from reprocessing are low and are limited to the radioactive gases contained in the spent fuel and a low level liquid waste steam. Both of these discharges are independently monitored, and controlled within strict discharge limits set by the UK Government`s Scottish Office. Transportation of spent fuel to Dounreay has been undertaken using many routes from mainland Europe and has utilised over the past few years both chartered and scheduled vessel services. Several different transport containers have been handled and are currently licensed in the UK. This paper provides a short history of MTR reprocessing at Dounreay, and provides information to show reprocessing can satisfy the needs of MTR operators, showing that reprocessing is a valuable asset in non-proliferation terms, offers a complete solution and is environmentally acceptable.

  17. Reprocessing RTR fuel in the La Hague plants

    International Nuclear Information System (INIS)

    Thomasson, J.; Drain, F.; David, A.

    2001-01-01

    Starting in 2006, research reactors operators will be fully responsible for the back-end management of their spent fuel. It appears that the only solution for this management is treatment-conditioning, which could be done at the La Hague reprocessing complex in France. The fissile material can be separated in the reprocessing plants and the final waste can be encapsulated in a matrix adapted to its potential hazards. RTR reprocessing at La Hague would require some modifications, since the plant had been primarily designed to reprocess fuel from light water reactors. Many provisions have been taken at the plant design stage, however, and the modifications would be feasible even during active operations, as was done from 1993 to 1995 when a new liquid waste management was implemented, and when one of the two vitrification facilities was improved. To achieve RTR back-end management, COGEMA and its partners are also conducting R and D to define a new generation of LEU fuel with performance characteristics approximating those of HEU fuel. This new-generation fuel would be easier to reprocess. (author)

  18. Reprocessing RTR fuel in the La Hague plants

    Energy Technology Data Exchange (ETDEWEB)

    Thomasson, J. [Cogema, F-78140 Velizy (France); Drain, F.; David, A. [SGN, F-78182 Saint Quentin en Yvelines (France)

    2001-07-01

    Starting in 2006, research reactors operators will be fully responsible for the back-end management of their spent fuel. It appears that the only solution for this management is treatment-conditioning, which could be done at the La Hague reprocessing complex in France. The fissile material can be separated in the reprocessing plants and the final waste can be encapsulated in a matrix adapted to its potential hazards. RTR reprocessing at La Hague would require some modifications, since the plant had been primarily designed to reprocess fuel from light water reactors. Many provisions have been taken at the plant design stage, however, and the modifications would be feasible even during active operations, as was done from 1993 to 1995 when a new liquid waste management was implemented, and when one of the two vitrification facilities was improved. To achieve RTR back-end management, COGEMA and its partners are also conducting R and D to define a new generation of LEU fuel with performance characteristics approximating those of HEU fuel. This new-generation fuel would be easier to reprocess. (author)

  19. Reprocessing RTR fuel in the La Hague plants

    Energy Technology Data Exchange (ETDEWEB)

    Thomasson, J. [Cogema, 78 - Velizy Villacoublay (France); Drain, F.; David, A. [SGN, 78 - Saint Quentin en Yveline (France)

    2001-07-01

    Starting in 2006, research reactors operators will be fully responsible for their research and testing reactors spent fuel back-end management. It appears that the only solution for this management is treatment-conditioning, which could be done at the La Hague reprocessing complex in France. The fissile material can be separated in the reprocessing plants and the final waste can be encapsulated in a matrix adapted to its potential hazards. RTR reprocessing at La Hague would require some modifications, since the plant had been primarily designed to reprocess fuel from light water reactors. Many provisions have been taken at the plant design stage, however, and the modifications would be feasible even during active operations, as was done from 1993 to 1995 when a new liquid waste management was implemented, and when one of the two vitrification facilities was improved. To achieve RTR back-end management, COGEMA and its partners are also conducting R and D to define a new generation of LEU fuel with performance characteristics approximating those of HEU fuel. This new-generation fuel would be easier to reprocess. (author)

  20. The reprocessing-recycling of spent nuclear fuel. Actinides separation - Application to wastes management

    International Nuclear Information System (INIS)

    2008-01-01

    After its use in the reactor, the spent fuel still contains lot of recoverable material for an energetic use (uranium, plutonium), but also fission products and minor actinides which represent the residues of nuclear reactions. The reprocessing-recycling of the spent fuel, as it is performed in France, implies the chemical separation of these materials. The development and the industrial implementation of this separation process represent a major contribution of the French science and technology. The reprocessing-recycling allows a good management of nuclear wastes and a significant saving of fissile materials. With the recent spectacular rise of uranium prices, this process will become indispensable with the development of the next generation of fast neutron reactors. This book takes stock of the present and future variants of the chemical process used for the reprocessing of spent fuels. It describes the researches in progress and presents the stakes and recent results obtained by the CEA. content: the separation of actinides, a key factor for a sustainable nuclear energy; the actinides, a discovery of the 20. century; the radionuclides in nuclear fuels; the aquo ions of actinides; some redox properties of actinides; some complexing properties of actinide cations; general considerations about treatment processes; some characteristics of nuclear fuels in relation with their reprocessing; technical goals and specific constraints of the PUREX process; front-end operations of the PUREX process; separation and purification operations of the PUREX process; elaboration of finite products in the framework of the PUREX process; management and treatment of liquid effluents; solid wastes of the PUREX process; towards a joint management of uranium and plutonium: the COEX TM process; technical options of treatment and recycling techniques; the fuels of generation IV reactors; front-end treatment processes of advanced fuels; hydrometallurgical processes for future fuel cycles

  1. Handbook on process and chemistry on nuclear fuel reprocessing

    Energy Technology Data Exchange (ETDEWEB)

    Suzuki, Atsuyuki [Tokyo Univ., Tokyo (Japan); Asakura, Toshihide; Adachi, Takeo [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; and others

    2001-12-01

    'Wet-type' nuclear fuel reprocessing technology, based on PUREX technology, has wide applicability as the principal reprocessing technology of the first generation, and relating technologies, waste management for example, are highly developed, too. It is quite important to establish a database summarizing fundamental information about the process and the chemistry of 'wet-type' reprocessing, because it contributes to establish and develop fuel reprocessing process and nuclear fuel cycle treating high burn-up UO{sub 2} fuel and spent MOX fuel, and to utilize 'wet-type' reprocessing technology much widely. This handbook summarizes the fundamental data on process and chemistry, which was collected and examined by 'Editing Committee of Handbook on Process and Chemistry of Nuclear Fuel Reprocessing', from FY 1993 until FY 2000. (author)

  2. Handbook on process and chemistry on nuclear fuel reprocessing

    International Nuclear Information System (INIS)

    Suzuki, Atsuyuki; Asakura, Toshihide; Adachi, Takeo

    2001-12-01

    'Wet-type' nuclear fuel reprocessing technology, based on PUREX technology, has wide applicability as the principal reprocessing technology of the first generation, and relating technologies, waste management for example, are highly developed, too. It is quite important to establish a database summarizing fundamental information about the process and the chemistry of 'wet-type' reprocessing, because it contributes to establish and develop fuel reprocessing process and nuclear fuel cycle treating high burn-up UO 2 fuel and spent MOX fuel, and to utilize 'wet-type' reprocessing technology much widely. This handbook summarizes the fundamental data on process and chemistry, which was collected and examined by 'Editing Committee of Handbook on Process and Chemistry of Nuclear Fuel Reprocessing', from FY 1993 until FY 2000. (author)

  3. Method for recovering palladium and technetium values from nuclear fuel reprocessing waste solutions

    Science.gov (United States)

    Horwitz, E. Philip; Delphin, Walter H.

    1979-07-24

    A method for recovering palladium and technetium values from nuclear fuel reprocessing waste solutions containing these and other values by contacting the waste solution with an extractant of tricaprylmethylammonium nitrate in an inert hydrocarbon diluent which extracts the palladium and technetium values from the waste solution. The palladium and technetium values are recovered from the extractant and from any other coextracted values with a strong nitric acid strip solution.

  4. Alpha-contaminated waste from reprocessing of nuclear fuel

    International Nuclear Information System (INIS)

    Sumner, W.

    1982-01-01

    The anticipated alpha-waste production rates from the Barnwell Nuclear Fuel Reprocessing plant is discussed. The estimated alpha-waste production rate from the 1500 metric ton/year plant is about 85,000 ft 3 /year at the 10 nCi/g limit. Most of this waste is estimated to come from the separation facility, and the major waste sources were cladding, which was 27%, and low-level contact-handled general process trash, which was estimated at 32% of the total. It was estimated that 45% of the waste was combustible and 72% of the waste was compactible. These characteristics could have a significant impact on the final volumes as disposed. Changing the alpha-waste limit from 10 nCi/g to 100 nCi/g was estimated to reduce the amount of alpha waste produced by about 20%. Again, the uncertainty in this value obviously has to be substantial. One has to recognize that these estimates were just that; they were not based on any operating experience. The total plutonium losses to waste, including the high-level waste, was estimated to be 1.5%. The cladding waste was estimated to be contaminated with alpha emitters to the extent of 10 4 to 10 5 nCi/g

  5. Reprocessing technology for present water reactor fuels

    International Nuclear Information System (INIS)

    McMurray, P.R.

    1977-01-01

    The basic Purex solvent extraction technology developed and applied in the U.S. in the 1950's provides a well-demonstrated and efficient process for recovering uranium and plutonium for fuel recycle and separating the wastes for further treatment and packaging. The technologies for confinement of radioactive effluents have been developed but have had limited utilization in the processing of commercial light water reactor fuels. Technologies for solidification and packaging of radioactive wastes have not yet been demonstrated but significant experience has been gained in laboratory and engineering scale experiments with simulated commercial reprocessing wastes and intermediate level wastes. Commercial scale experience with combined operations of all the required processes and equipment are needed to demonstrate reliable reprocessing centers

  6. Research and development of FBR fuel reprocessing in PNC

    International Nuclear Information System (INIS)

    Hoshino, T.

    1976-05-01

    The research program of the PNC for FBR fuel reprocessing in Japan is discussed. The general characteristics of FBR fuel reprocessing are pointed out and a comparison with LWR fuel is made. The R and D program is based on reprocessing using the aqueous Purex process. So far, some preliminary steps of the research program have been carried out, these include solvent extraction test, off-gas treatment test, voloxidation process study, solidification test of high-level liquid waste, and study of the dissolution behaviour of irradiated mixed oxide fuel. By the end of the 1980s, a pilot plant for FBR fuel reprocessing will be completed. For the design of the pilot plant, further research will be carried out in the following fields: head-end techniques; voloxidation process; dissolution and extraction techniques; waste treatment techniques. A time schedule for the different steps of the program is included

  7. Fuel reprocessing at a loss to prove its justification

    International Nuclear Information System (INIS)

    Traube, K.

    1986-01-01

    Commercial utilization of nuclear energy is possible with or without fuel reprocessing of spent fuel elements. Demands on terminal storage are about equal in both cases. There is no reason - excluding the military one - to decide in favour of fuel reprocessing instead of direct terminal storage, for neither does fuel reprocessing offer advantages in regard of the safety of nuclear waste disposal, nor is it necessary to produce plutonium for the breeder reactor. Fuel reprocessing is analyzed considering those changed aspects with a view to scarcer uranium resources, juridical motives, and what is termed the development deficit. (DG) [de

  8. Handbook on process and chemistry on nuclear fuel reprocessing

    Energy Technology Data Exchange (ETDEWEB)

    Suzuki, Atsuyuki (ed.) [Tokyo Univ., Tokyo (Japan); Asakura, Toshihide; Adachi, Takeo (eds.) [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment] [and others

    2001-12-01

    'Wet-type' nuclear fuel reprocessing technology, based on PUREX technology, has wide applicability as the principal reprocessing technology of the first generation, and relating technologies, waste management for example, are highly developed, too. It is quite important to establish a database summarizing fundamental information about the process and the chemistry of 'wet-type' reprocessing, because it contributes to establish and develop fuel reprocessing process and nuclear fuel cycle treating high burn-up UO{sub 2} fuel and spent MOX fuel, and to utilize 'wet-type' reprocessing technology much widely. This handbook summarizes the fundamental data on process and chemistry, which was collected and examined by 'Editing Committee of Handbook on Process and Chemistry of Nuclear Fuel Reprocessing', from FY 1993 until FY 2000. (author)

  9. Applications of chemical sensors in spent fuel reprocessing and waste management

    International Nuclear Information System (INIS)

    Achuthan, P.V.

    2012-01-01

    Environmental friendly power generation is essential to preserve the quality of life for the future generations. For more than fifty years, nuclear energy has proven its potential as an economically and commercially viable alternative to conventional energy. More over it is a clean source of energy with minimum green house effect. Recent data on climate changes have stressed the need for more caution on atmospheric discharges, hence a revival of interest in nuclear energy is in the offing. The entire world is committed to protect the atmosphere from polluting agents. Even nuclear power plants and the fuel cycle facilities are looking forward to reduce the already low gaseous emissions further and also to develop ways and means of controlling the impact of the small but significant radiotoxicity of the wastes generated in the nuclear fuel cycle. Spent fuel reprocessing and associated waste management, an integral part of the nuclear fuel cycle, employs chemical processes for the recovery of fuel value and for the conditioning of the reprocessed waste. In this respect they can be classified as a chemical plant dealing with radioactive materials. Hence it is essential to keep the gaseous, liquid and solid discharges at the lowest possible levels to comply with the regulations of discharges stipulated by the regulatory authorities. Elaborate cleaning and detection systems are needed for effective control of these discharges from both radioactive and chemical contamination point of view. Even though radiation detectors, which are non specific to the analytes, are the major tools for these controls, analyte specific chemical sensors can play a vital role in controlling the chemical vapours/gases generated during processing. The presentation will cover the major areas where chemical sensors play a significant role in this industry. (author)

  10. Storage and Reprocessing of Spent Nuclear Fuel

    Energy Technology Data Exchange (ETDEWEB)

    Karpius, Peter Joseph [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-02-02

    Addressing the problem of waste, especially high-level waste (HLW), is a requirement of the nuclear fuel cycle that cannot be ignored. We explore the two options employed currently, long-term storage and reprocessing.

  11. Historical fuel reprocessing and HLW management in Idaho

    International Nuclear Information System (INIS)

    Knecht, D.A.; Staiger, M.D.; Christian, J.D.

    1997-01-01

    This article review some of the key decision points in the historical development of spent fuel reprocessing and waste management practices at the Idaho Chemical Processing Plant that have helped ICPP to successfully accomplish its mission safely and with minimal impact on the environment. Topics include ICPP reprocessing development; batch aluminum-uranium dissolution; continuous aluminum uranium dissolution; batch zirconium dissolution; batch stainless steel dissolution; semicontinuous zirconium dissolution with soluble poison; electrolytic dissolution of stainless steel-clad fuel; graphite-based rover fuel processing; fluorinel fuel processing; ICPP waste management consideration and design decisions; calcination technology development; ICPP calcination demonstration and hot operations; NWCF design, construction, and operation; HLW immobilization technology development. 80 refs., 4 figs

  12. The regulations concerning the reprocessing business of spent fuels

    International Nuclear Information System (INIS)

    1981-01-01

    This rule is stipulated under the provisions of reprocessing business in the law concerning regulation of nuclear raw materials, nuclear fuel materials and nuclear reactors and to execute them. Basic terms are defined, such as exposure radiation dose, cumulative dose, control area, security area, surrounding monitoring area, worker, radioactive waste and facility for discharging into the sea. The application for the designation for reprocessing business under the law shall include the maximum reprocessing capacities per day and per year of each kind of spent fuel, to be reprocessed and the location, structure and equipment of reprocessing facilities as specified in the regulation. Records shall be made in each works or enterprise on the inspection, operation and maintenance of reprocessing facilities, radiation control, accidents and weather, and kept for particular periods respectively. Reprocessing enterprisers shall set up control area, security area and surrounding monitoring area to restrict entrance, etc. Specified measures shall be taken by these enterprisers concerning the exposure radiation doses of workers. Reprocessing facilities shall be inspected and examined more than once a day. The regular self-inspection and operation of reprocessing facilities, the transport and storage of nuclear fuel materials, the disposal of radioactive wastes in works or enterprises where reprocessing facilities are located, and security rules are defined in detail, respectively. (Okada, K.)

  13. Fast reactor fuel reprocessing in the UK

    International Nuclear Information System (INIS)

    Allardice, R.H.; Williams, J.; Buck, C.

    1977-01-01

    Enriched uranium metal fuel irradiated in the Dounreay Fast Reactor has been reprocessed and refabricated in plants specifically designed for the purpose in the U.K. since 1961. Efficient and reliable fuel recycle is essential to the development of a plutonium based fast reactor system and the importance of establishing at an early stage fast reactor fuel reprocessing has been reinforced by current world difficulties in reprocessing high burn-up thermal reactor oxide fuel. In consequence, the U.K. has decided to reprocess irradiated fuel from the 250 MW(E) Prototype Fast Reactor as an integral part of the fast reactor development programme. Flowsheet and equipment development work for the small scale fully active demonstration plant have been carried out over the past 5 years and the plant will be commissioned and ready for active operation during 1977. In parallel, a comprehensive waste management system has been developed and installed. Based on this development work and the information which will arise from active operation of the plant a parallel development programme has been initiated to provide the basis for the design of a large scale fast reactor fuel reprocessing plant to come into operation in the late 1980s to support the projected U.K. fast reactor installation programme. The paper identifies the important differences between fast reactor and thermal reactor fuel reprocessing technologies and describes some of the development work carried out in these areas for the small scale P.F.R. fuel reprocessing operation. In addition, the development programme in aid of the design of a larger scale fast reactor fuel reprocessing plant is outlined and the current design philosophy is discussed

  14. PYRO, a system for modeling fuel reprocessing

    International Nuclear Information System (INIS)

    Ackerman, J.P.

    1989-01-01

    Compact, on-site fuel reprocessing and waste management for the Integral Fast Reactor are based on the pyrochemical reprocessing of metal fuel. In that process, uranium and plutonium in spent fuel are separated from fission products in an electrorefiner using liquid cadmium and molten salt solvents. Quantitative estimates of the distribution of the chemical elements among the metal and salt phases are essential for development of both individual pyrochemical process steps and the complete process. This paper describes the PYRO system of programs used to generate reliable mass flows and compositions

  15. Partitioning of actinide from simulated high level wastes arising from reprocessing of PHWR fuels: counter current extraction studies using CMPO

    International Nuclear Information System (INIS)

    Deshingkar, D.S.; Chitnis, R.R.; Wattal, P.K.; Theyyunni, T.K.; Nair, M.K.T.; Ramanujam, A.; Dhami, P.S.; Gopalakrishnan, V.; Rao, M.K.; Mathur, J.N.; Murali, M.S.; Iyer, R.H.; Badheka, L.P.; Banerji, A.

    1994-01-01

    High level wastes (HLW) arising from reprocessing of pressurised heavy water reactor (PHWR) fuels contain actinides like neptunium, americium and cerium which are not extracted in the Purex process. They also contain small quantities of uranium and plutonium in addition to fission products. Removal of these actinides prior to vitrification of HLW can effectively reduce the active surveillance period of final waste form. Counter current studies using indigenously synthesised octyl (phenyl)-N, N-diisobutylcarbamoylmethylphosphine oxide (CMPO) were taken up as a follow-up of successful runs with simulated sulphate bearing low acid HLW solutions. The simulated HLW arising from reprocessing of PHWR fuel was prepared based on presumed burnup of 6500 MWd/Te of uranium, 3 years cooling period and 800 litres of waste generation per tonne of fuel reprocessed. The alpha activity of the HLW raffinate after extraction with the CMPO-TBP mixture could be brought down to near background level. (author). 13 refs., 2 tabs., 12 figs

  16. Partitioning of actinide from simulated high level wastes arising from reprocessing of PHWR fuels: counter current extraction studies using CMPO

    Energy Technology Data Exchange (ETDEWEB)

    Deshingkar, D S; Chitnis, R R; Wattal, P K; Theyyunni, T K; Nair, M K.T. [Bhabha Atomic Research Centre, Bombay (India). Process Engineering and Systems Development Div.; Ramanujam, A; Dhami, P S; Gopalakrishnan, V; Rao, M K [Bhabha Atomic Research Centre, Bombay (India). Fuel Reprocessing Group; Mathur, J N; Murali, M S; Iyer, R H [Bhabha Atomic Research Centre, Bombay (India). Radiochemistry Div.; Badheka, L P; Banerji, A [Bhabha Atomic Research Centre, Bombay (India). Bio-organic Div.

    1994-12-31

    High level wastes (HLW) arising from reprocessing of pressurised heavy water reactor (PHWR) fuels contain actinides like neptunium, americium and cerium which are not extracted in the Purex process. They also contain small quantities of uranium and plutonium in addition to fission products. Removal of these actinides prior to vitrification of HLW can effectively reduce the active surveillance period of final waste form. Counter current studies using indigenously synthesised octyl (phenyl)-N, N-diisobutylcarbamoylmethylphosphine oxide (CMPO) were taken up as a follow-up of successful runs with simulated sulphate bearing low acid HLW solutions. The simulated HLW arising from reprocessing of PHWR fuel was prepared based on presumed burnup of 6500 MWd/Te of uranium, 3 years cooling period and 800 litres of waste generation per tonne of fuel reprocessed. The alpha activity of the HLW raffinate after extraction with the CMPO-TBP mixture could be brought down to near background level. (author). 13 refs., 2 tabs., 12 figs.

  17. Analysis and study of spent fuel reprocessing technology from birth to present

    International Nuclear Information System (INIS)

    Takahashi, Keizo

    2006-01-01

    As for the nuclear fuel reprocessing of the spent fuel, although there was argument of pros and cons, it was decided to start Rokkasho reprocessing project further at the Japan Atomic Energy Commission of ''Long-Term Program for Research, Development and Utilization of Nuclear Energy'' in year 2004. The operation of Tokai Reprocessing is going steadily to reprocess spent fuel more than 1,100 tons. In this paper, history, present status and future of reprocessing technology is discussed focusing from military Pu production, Magnox fuel reprocessing to oxide fuel reprocessing. Amount of reprocessed fuel are estimated based on fuel type. Then, history of reprocessing, US, UK, France, Germany, Russian, Belgian and Japan is presented and compared on technology, national character, development organization, environmental protection, and high active waste vitrification. Technical requirements are increased from Pu production fuel, Magnox fuel and oxide fuel mainly because of higher burnup. Reprocessing technology is synthetic of engineering and accumulation of operational experience. The lessons learned from the operational experience of the world will be helpful for establishment of nuclear fuel reprocessing technology in Japan. (author)

  18. Reprocessing of ''fast'' fuel in France

    International Nuclear Information System (INIS)

    Sauteron, J.; Bourgeois, M.; Le Bouhellec, J.; Miquel, P.

    1976-05-01

    The results of laboratory studies as well as pilot testing (AT-I La Hague, Marcoule, Fontenay-aux-Roses) in reprocessing of fast breeder reactor fuels are described. The paper covers all steps: head end, aqueous and fluoride volatility processes, and waste treatment. In conclusion, it is demonstrated why it is still too early to define a strategy of industrial reprocessing for this reactor type

  19. Handbook on process and chemistry of nuclear fuel reprocessing version 2

    International Nuclear Information System (INIS)

    2008-10-01

    Aqueous nuclear fuel reprocessing technology, based on PUREX technology, has wide applicability as the principal reprocessing technology of the first generation, and relating technologies, waste management for example, are highly developed, too. It is quite important to establish a database summarizing fundamental information about the process and the chemistry of aqueous reprocessing, because it contributes to establish and develop fuel reprocessing technology and nuclear fuel cycle treating high burn-up UO 2 fuel and spent MOX fuel, and to utilize aqueous reprocessing technology much widely. This handbook is the second edition of the first report, which summarizes the fundamental data on process and chemistry, which was collected and examined by 'Editing Committee of Handbook on Process and Chemistry of Nuclear Fuel Reprocessing' from FY 1993 until FY 2000. (author)

  20. Waste management in reprocessing plants

    International Nuclear Information System (INIS)

    Mortreuil, M.

    1982-01-01

    This lecture will give a survey of the French policy for the management of wastes in reprocessing plants. In consideration of their radioactivity, they must be immobilized in matrix in such a manner that they are stored under optimal safety conditions. A general review on the nature, nucleide content and quantity of the various wastes arising from thermal nuclear fuel reprocessing is given in the light of the French plants UP1 at Marcoule and UP2 at La Hague. The procedures of treatment of such wastes and their conditioning into inert packages suitable for temporary or terminal storage are presented, especially concerning the continuous vitrification process carried out for fission product solutions. The requirements of each option are discussed and possible alternative solutions are exposed. (orig./RW)

  1. Management and disposal of used nuclear fuel and reprocessing wastes

    International Nuclear Information System (INIS)

    1983-01-01

    The subject is dealt with in chapters, entitled: introduction (general statement of problem); policy framework (criteria for waste management policy); waste management and disposal, as practised and planned (general; initial storage; reprocessing and conditioning of reprocessing wastes; intermediate storage; transportation; packaging; disposal); international co-operation. Details of the situation in each country concerned (Australia, Belgium, Canada, France, Federal Republic of Germany, Spain, Sweden, Switzerland and United Kingdom) are included as annexes. (U.K.)

  2. The use of curium neutrons to verify plutonium in spent fuel and reprocessing wastes

    International Nuclear Information System (INIS)

    Miura, N.

    1994-05-01

    For safeguards verification of spent fuel, leached hulls, and reprocessing wastes, it is necessary to determine the plutonium content in these items. We have evaluated the use of passive neutron multiplicity counting to determine the plutonium content directly and also to measure the 240 Pu/ 244 Cm ratio for the indirect verification of the plutonium. Neutron multiplicity counting of the singles, doubles, and triples neutrons has been evaluated for measuring 240 Pu, 244 Cm, and 252 Cf. We have proposed a method to establish the plutonium to curium ratio using the hybrid k-edge densitometer x-ray fluorescence instrument plus a neutron coincidence counter for the reprocessing dissolver solution. This report presents the concepts, experimental results, and error estimates for typical spent fuel applications

  3. Reprocessing of spent fuel and public acceptance

    International Nuclear Information System (INIS)

    Imai, Ryukichi

    1977-01-01

    The public acceptance has to be considered regarding whole atomic power rather than the reprocessing of nuclear fuel separately, and the problems concerned are as follows; the release of radioactive materials in the normal and abnormal operations of reprocessing plants, the disposal of wastes with high level radioactivity, the transportation of high level radioactive material, the relation to the economic activity near nuclear plants, the environmental effect of 85 Kr. and 3 H, etc., and the physical protection for reprocessing facility itself, the special handling of the materials of very high radioactivity level such as fission products and plutonium, the radiation exposure of operators, and the demonstration of reprocessing techniques of commercial base, etc., as a part of the nuclear fuel cycle, and the relation between atomic power and other technologies in energy supply, the evalution of atomic power as the symbol of huge scale science, and the energy problem within the confrontation of economic development and the preservation of environment and resources regarding whole nuclear energy. The situations of fuel reprocessing in USA, UK, France, Germany and Japan are explained from the viewpoint of the history. The general background for the needs of nuclear energy in Japan, the image of nuclear energy and fuel reprocessing entertained by the general public, and the special feature of reprocessing techniques are described. (Nakai, Y.)

  4. Fast-reactor fuel reprocessing in the United Kingdom

    International Nuclear Information System (INIS)

    Allardice, R.H.; Buck, C.; Williams, J.

    1977-01-01

    Enriched uranium metal fuel irradiated in the Dounreay Fast Reactor has been reprocessed and refabricated in plants specifically designed for the purpose in the United Kingdom since 1961. Efficient and reliable fuel recycle is essential to the development of a plutonium-based fast-reactor system, and the importance of establishing at an early stage fast-reactor fuel reprocessing has been reinforced by current world difficulties in reprocessing high-burnup thermal-reactor oxide fuel. The United Kingdom therefore decided to reprocess irradiated fuel from the 250MW(e) Prototype Fast Reactor (PFR) as an integral part of the fast reactor development programme. Flowsheet and equipment development work for the small-scale fully active demonstration plant has been carried out since 1972, and the plant will be commissioned and ready for active operation during 1977. In parallel, a comprehensive waste-management system has been developed and installed. Based on this development work and the information which will arise from active operation of the plant, a parallel development programme has been initiated to provide the basis for the design of a large-scale fast-reactor fuel-reprocessing plant to come into operation in the late 1980s to support the projected UK fast-reactor installation programme. The paper identifies the important differences between fast-reactor and thermal-reactor fuel-reprocessing technologies and describes some of the development work carried out in these areas for the small-scale PFR fuel-reprocessing operation. In addition, the development programme in aid of the design of a larger scale fast-reactor fuel-reprocessing plant is outlined and the current design philosophy discussed. (author)

  5. Closed Fuel Cycle Waste Treatment Strategy

    Energy Technology Data Exchange (ETDEWEB)

    Vienna, J. D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Collins, E. D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Crum, J. V. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ebert, W. L. [Argonne National Lab. (ANL), Argonne, IL (United States); Frank, S. M. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Garn, T. G. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Gombert, D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Jones, R. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Jubin, R. T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Maio, V. C. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Marra, J. C. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Matyas, J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Nenoff, T. M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Riley, B. J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Sevigny, G. J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Soelberg, N. R. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Strachan, D. M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Thallapally, P. K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Westsik, J. H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-02-01

    This study is aimed at evaluating the existing waste management approaches for nuclear fuel cycle facilities in comparison to the objectives of implementing an advanced fuel cycle in the U.S. under current legal, regulatory, and logistical constructs. The study begins with the Global Nuclear Energy Partnership (GNEP) Integrated Waste Management Strategy (IWMS) (Gombert et al. 2008) as a general strategy and associated Waste Treatment Baseline Study (WTBS) (Gombert et al. 2007). The tenets of the IWMS are equally valid to the current waste management study. However, the flowsheet details have changed significantly from those considered under GNEP. In addition, significant additional waste management technology development has occurred since the GNEP waste management studies were performed. This study updates the information found in the WTBS, summarizes the results of more recent technology development efforts, and describes waste management approaches as they apply to a representative full recycle reprocessing flowsheet. Many of the waste management technologies discussed also apply to other potential flowsheets that involve reprocessing. These applications are occasionally discussed where the data are more readily available. The report summarizes the waste arising from aqueous reprocessing of a typical light-water reactor (LWR) fuel to separate actinides for use in fabricating metal sodium fast reactor (SFR) fuel and from electrochemical reprocessing of the metal SFR fuel to separate actinides for recycle back into the SFR in the form of metal fuel. The primary streams considered and the recommended waste forms include; Tritium in low-water cement in high integrity containers (HICs); Iodine-129: As a reference case, a glass composite material (GCM) formed by the encapsulation of the silver Mordenite (AgZ) getter material in a low-temperature glass is assumed. A number of alternatives with distinct advantages are also considered including a fused silica waste form

  6. Reprocessing technology of liquid metal cooled fast breeder reactor fuel

    International Nuclear Information System (INIS)

    Baetsle, L.H.; Broothaerts, J.; Heylen, P.R.; Eschrich, H.; Geel, J. van

    1974-11-01

    All the important aspects of LMFBR fuel reprocessing are critically reviewed in this report. Storage and transportation techniques using sodium, inert gas, lead, molten salts and organic coolants are comparatively discussed in connection with cooling time and de-activation techniques. Decladding and fuel disaggregation of UO 2 -PuO 2 fuel are reviewed according to the present state of R and D in the main nuclear powers. Strong emphasis is put on on voloxidation, mechanical pulverization and molten salt disaggregation in connection with volatilization of gaseous fission products. Release of fission gases and the resulting off-gas treatment are discussed in connection with cooling time, burn up and dissagregation techniques. The review is limited to tritium, iodine xenon-krypton and radioactive airborne particulates. Dissolution, solvent extraction and plutonium purification problems specifically connected to LMFBR fuel are reviewed with emphasis on the differences between LWR and fast fuel reprocessing. Finally the categories of wastes produced by reprocessing are analysed according to their origin in the plant and their alpha emitters content. The suitable waste treatment techniques are discussed in connection with the nature of the wastes and the ultimate disposal technique. (author)

  7. On permission of reprocessing project change at the Reprocessing Works of the Japan Nuclear Fuel Ltd. (Reply)

    International Nuclear Information System (INIS)

    1997-01-01

    The Nuclear Safety Commission replied as follows to the Prime Minister on July 14, 1997 on permission of reprocessing project change at the Reprocessing Works of the Japan Nuclear Fuel Ltd. inquired on Dec. 26, 1996. Contents of the inquiry consisted of change of refinery facility and its related instruments, integration of low level wasted liquid treating instrument and change of low level solid waste treating instrument, integration of high level wasted liquid storing building and high level wasted liquid glassification building, installation of used fuel transporting container maintenance instrument and its relating instruments, and so forth. As a result of careful discussion at the Commission for these items, they were admitted to be valid on her technical ability and her safety. (G.K.)

  8. Back-end of the nuclear fuel cycle. A comparison of the direct disposal and reprocessing options

    International Nuclear Information System (INIS)

    Allan, C.J.; Baumgartner, P.

    1997-01-01

    Based on the need to address public concerns, the need to ensure long-term safety and an ethical concern for future generations, many countries are developing technology to dispose of nuclear fuel waste. The waste substances in used fuel can be disposed of either by directly disposing of the used fuel assemblies themselves, or by disposing of the long-lived waste from fuel reprocessing. The basic thesis of this paper is that the direct disposal of either used fuel or of the long-lived heat-generating and non-heat generating waste that arise from reprocessing is technically and economically feasible and that both options will meet the fundamental objectives of protecting human health and the environment. Decisions about whether, or when, to reprocess used fuel, or about whether to dispose of used fuel directly, are not fundamentally waste management issues. (author)

  9. The regulations concerning the reprocessing business of spent fuels

    International Nuclear Information System (INIS)

    1980-01-01

    The office ordinance is established under the provisions related to reprocessing businesses of the law concerning regulation of nuclear raw materials, nuclear fuel materials and reactors, to enforce the provisions. The basic terms are defined, such as exposure radiation dose; accumulated dose; controlled area; maintenance area; surrounding watch area; employee; radioactive waste; the facilities for discharge to sea. An application for the designation of reprocessing businesses shall be filed, listing the following matters: the maximum daily and yearly reprocessing capacities for each kind of spent fuel; the location and general structure of reprocessing facilities; the structures of buildings; the structure and equipments of main reprocessing facilities, the storage facilities for products and the disposal facilities for radioactive wastes; the equipments of measuring and control system facilities and radiation control facilities, etc. Records shall be made on the inspection of reprocessing facilities, radiation control, operation, maintenance, the accidents of reprocessing facilities and weather, and kept for the period from one to ten years, respectively. Any person engaging in reprocessing businesses shall set up control, maintenance and surrounding watch areas, and take specified measures to restrict the entrance of persons. The measures to be taken against exposure radiation dose, the inspection, regular independent examination and operation of reprocessing facilities and other related matters are stipulated in detail. (Okada, K.)

  10. Used mixed oxide fuel reprocessing at RT-1 plant

    Energy Technology Data Exchange (ETDEWEB)

    Kolupaev, D.; Logunov, M.; Mashkin, A.; Bugrov, K.; Korchenkin, K. [FSUE PA ' Mayak' , 30, Lenins str, Ozersk, 460065 (Russian Federation); Shadrin, A.; Dvoeglazov, K. [ITCP ' PRORYV' , 2/8 Malaya Krasmoselskay str, Moscow, 107140 (Russian Federation)

    2016-07-01

    Reprocessing of the mixed uranium-plutonium spent nuclear fuel of the BN-600 reactor was performed at the RT-1 plant twice, in 2012 and 2014. In total, 8 fuel assemblies with a burn-up from 73 to 89 GW day/t and the cooling time from 17 to 21 years were reprocessed. The reprocessing included the stages of dissolution, clarification, extraction separation of U and Pu with purification from the fission products, refining of uranium and plutonium at the relevant refining cycles. Dissolution of the fuel composition of MOX used nuclear fuel (UNF) in nitric acid solutions in the presence of fluoride ion has occurred with the full transfer of actinides into solution. Due to the high content of Pu extraction separation of U and Pu was carried out on a nuclear-safe equipment designed for the reprocessing of highly enriched U spent nuclear fuel and Pu refining. Technological processes of extraction, separation and refining of actinides proceeded without deviations from the normal mode. The output flow of the extraction outlets in their compositions corresponded to the regulatory norms and remained at the level of the compositions of the streams resulting from the reprocessing of fuel types typical for the RT-1 plant. No increased losses of Pu into waste have been registered during the reprocessing of BN-600 MOX UNF an compare with VVER-440 uranium UNF reprocessing. (authors)

  11. The proceedings of China-Japan workshop on nuclear waste management and reprocessing

    International Nuclear Information System (INIS)

    2000-01-01

    China-Japan workshop on Nuclear Waste Management and Reprocessing held by sponsors, Nuclear Chemical Engineering Association, Chinese nuclear Society and Division of nuclear Fuel Cycle and Environment, Atomic Energy Society of Japan and by co-sponsor, Nuclear and Radiochemistry Association, Chinese Nuclear Society, on April 5-7, 2000, in Beijing, China. The proceedings is published. It collected 34 articles. The contents include nuclear fuel reprocessing, radioactive waste processing and radioactive waste disposal, partitioning and transmutation, radionuclide migration, sorption and diffusion and actinide chemistry

  12. MOX fuel reprocessing and recycling

    International Nuclear Information System (INIS)

    Guillet, J.L.

    1990-01-01

    This paper is devoted to the reprocessing of MOX fuel in UP2-800 plant at La Hague, and to the MOX successive reprocessing and recycling. 1. MOX fuel reprocessing. In a first step, the necessary modifications in UP2-800 to reprocess MOX fuel are set out. Early in the UP2-800 project, actions have been taken to reprocess MOX fuel without penalty. They consist in measures regarding: Dissolution; Radiological shieldings; Nuclear instrumentation; Criticality. 2. Mox successive reprocessing and recycling. The plutonium recycling in the LWR is now a reality and, as said before, the MOX fuel reprocessing is possible in UP2-800 plant at La Hague. The following actions in this field consist in verifying the MOX successive reprocessing and recycling possibilities. After irradiation, the fissile plutonium content of irradiated MOX fuel is decreased and, in this case, the re-use of plutonium in the LWR need an important increase of initial Pu enrichment inconsistent with the Safety reactor constraints. Cogema opted for reprocessing irradiated MOX fuel in dilution with the standard UO2 fuel in appropriate proportions (1 MOX for 4 UO2 fuel for instance) in order to save a fissile plutonium content compatible with MOX successive recycling (at least 3 recyclings) in LWR. (author). 2 figs

  13. Nuclear fuel reprocessing and high level waste disposal: informational hearings. Volume V. Reprocessing. Part 2

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-03-08

    Testimony was presented by a four member panel on the commercial future of reprocessing. Testimony was given on the status of nuclear fuel reprocessing in the United States. The supplemental testimony and materials submitted for the record are included in this report. (LK)

  14. Conservatism in effective dose calculations for accident events involving fuel reprocessing waste tanks.

    Science.gov (United States)

    Bevelacqua, J J

    2011-07-01

    Conservatism in the calculation of the effective dose following an airborne release from an accident involving a fuel reprocessing waste tank is examined. Within the regulatory constraints at the Hanford Site, deterministic effective dose calculations are conservative by at least an order of magnitude. Deterministic calculations should be used with caution in reaching decisions associated with required safety systems and mitigation philosophy related to the accidental release of airborne radioactive material to the environment.

  15. Spent fuel reprocessing options

    International Nuclear Information System (INIS)

    2008-08-01

    The objective of this publication is to provide an update on the latest developments in nuclear reprocessing technologies in the light of new developments on the global nuclear scene. The background information on spent fuel reprocessing is provided in Section One. Substantial global growth of nuclear electricity generation is expected to occur during this century, in response to environmental issues and to assure the sustainability of the electrical energy supply in both industrial and less-developed countries. This growth carries with it an increasing responsibility to ensure that nuclear fuel cycle technologies are used only for peaceful purposes. In Section Two, an overview of the options for spent fuel reprocessing and their level of development are provided. A number of options exist for the treatment of spent fuel. Some, including those that avoid separation of a pure plutonium stream, are at an advanced level of technological maturity. These could be deployed in the next generation of industrial-scale reprocessing plants, while others (such as dry methods) are at a pilot scale, laboratory scale or conceptual stage of development. In Section Three, research and development in support of advanced reprocessing options is described. Next-generation spent fuel reprocessing plants are likely to be based on aqueous extraction processes that can be designed to a country specific set of spent fuel partitioning criteria for recycling of fissile materials to advanced light water reactors or fast spectrum reactors. The physical design of these plants must incorporate effective means for materials accountancy, safeguards and physical protection. Section four deals with issues and challenges related to spent fuel reprocessing. The spent fuel reprocessing options assessment of economics, proliferation resistance, and environmental impact are discussed. The importance of public acceptance for a reprocessing strategy is discussed. A review of modelling tools to support the

  16. Spent fuel management in France: Reprocessing, conditioning, recycling

    International Nuclear Information System (INIS)

    Giraud, J.P.; Montalembert, J.A. de

    1994-01-01

    The French energy policy has been based for 20 years on the development of nuclear power. The some 75% share of nuclear in the total electricity generation, representing an annual production of 317 TWh requires full fuel cycle control from the head-end to the waste management. This paper presents the RCR concept (Reprocessing, Conditioning, Recycling) with its industrial implementation. The long lasting experience acquired in reprocessing and MOX fuel fabrication leads to a comprehensive industrial organization with minimized impact on the environment and waste generation. Each 900 MWe PWR loaded with MOX fuel avoids piling up 2,500 m 3 per year of mine tailings. By the year 2000, less than 500 m 3 of high-level and long-lived waste will be annually produced at La Hague for the French program. The fuel cycle facilities and the associated MOX loading programs are ramping-up according to schedule. Thus, the RCR concept is a reality as well as a policy adopted in several countries. Last but not least, RCR represents a strong commitment to non-proliferation as it is the way to fully control and master the plutonium inventory

  17. Application of electrochemical techniques in fuel reprocessing- an overview

    Energy Technology Data Exchange (ETDEWEB)

    Rao, M K; Bajpai, D D; Singh, R K [Power Reactor Fuel Reprocessing Plant, Tarapur (India)

    1994-06-01

    The operating experience and development work over the past several years have considerably improved the wet chemical fuel reprocessing PUREX process and have brought the reprocessing to a stage where it is ready to adopt the introduction of electrochemical technology. Electrochemical processes offer advantages like simplification of reprocessing operation, improved performance of the plant and reduction in waste volume. At Power Reactor Fuel Reprocessing plant, Tarapur, work on development and application of electrochemical processes has been carried out in stages. To achieve plant scale application of these developments, a new electrochemical cycle is being added to PUREX process at PREFRE. This paper describes the electrochemical and membrane cell development activities carried out at PREFRE and their current status. (author). 5 refs., 4 tabs.

  18. Numerical simulations of waste forms from the reprocessing of nuclear fuel

    International Nuclear Information System (INIS)

    Schneider, Stephan

    2014-01-01

    The usage of fissile material for nuclear fuel causes that alongside radioactive wastes are produced. These waste materials are created during all handling or usage operations within the nuclear fuel cycle. The main source of radiotoxicity is produced during the usage of nuclear fuel within the reactor. Energy is released by neutron induced fission reactions in heavy isotopes. Parts of the created fission products have large radiotoxicities. Due to neutron capture within the nuclear fuel the radiotoxicity is furthermore increased. These waste streams from the nuclear fuel cycle must be stored in a safe way to prevent any contamination of the biosphere and any harm to the civilization or the environment. The waste packages must be treated and conditioned for the final disposal. These created packages are subject to an independent product control to ensure there acceptability for transport, interim and final storage. The independent product control is a significant component of an effective waste management system. The aim of this work is the development of a software system used for the assessment of radioactive waste packages. The software shall permit the auditor to perform scenario analysis to forecast the product properties of a certain waste stream and therefore optimize the needed inspection scope in preparation of a new campaign. The software is designed as a modular library this permits the most flexible use of the software components and a high reusability of written analysis software. The software system is used for coupling of established and well-known simulation programs used for nuclear systems. The results of Monte-Carlo simulations and burn-up calculations are automatically imported and prepared for user interaction. The usage of simulation programs cause different challenges to the computing infrastructure. The scenario analyses need a large number of parameter variations which are bound to the computing time. For this reason additional to the

  19. Radiation effects in glass and glass-ceramic waste forms for the immobilization of CANDU UO2 fuel reprocessing waste

    International Nuclear Information System (INIS)

    Tait, J.C.

    1993-05-01

    AECL has investigated three waste forms for the immobilization of high-level liquid wastes that would arise if used CANDU fuels were reprocessed at some time in the future to remove fissile materials for the fabrication of new power reactor fuel. These waste forms are borosilicate glasses, aluminosilicate glasses and titanosilicate glass-ceramics. This report discusses the potential effects of alpha, beta and gamma radiation on the releases of radionuclides from these waste forms as a result of aqueous corrosion by groundwaters that would be present in an underground waste disposal vault. The report discusses solid-state damage caused by radiation-induced atomic displacements in the waste forms as well as irradiation of groundwater solutions (radiolysis), and their potential effects on waste-form corrosion and radionuclide release. The current literature on radiation effects on borosilicate glasses and in ceramics is briefly reviewed, as are potential radiation effects on specialized waste forms for the immobilization of 129 I, 85 Kr and 14 C. (author). 104 refs., 9 tabs., 5 figs

  20. 10 CFR Appendix F to Part 50 - Policy Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities

    Science.gov (United States)

    2010-01-01

    ... and Related Waste Management Facilities F Appendix F to Part 50 Energy NUCLEAR REGULATORY COMMISSION... Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities 1. Public health... facilities for the temporary storage of highlevel radioactive wastes, may be located on privately owned...

  1. The Assessment of Radioactive Liquid Waste Treatment Generated From The Fuel Reprocessing Plant Using Chemical Coagulation Method

    International Nuclear Information System (INIS)

    Kuncoro Arief, H; M Birmano, Dj

    1998-01-01

    Reprocessing of nuclear spent fuel produced 8 lot of radioactive liquid waste still bearing uranium and transuranium. The assessment of the radioactive liquid waste treatment with FeCI 3 as coagulant has been done. Decontamination factor and separation efficiency can be calculated from known activities of initial and post-treatment wastes. It can be concluded that some factors i.e. pH of treatment process, quantity of coagulant, mixing rate, and mixing time have influenced the treatment product

  2. Predicting the behaviour or neptunium during nuclear fuel reprocessing

    International Nuclear Information System (INIS)

    Drake, V.A.

    1988-01-01

    Behaviour of Np and its distribution over reprocessing flowsheet is studied due to the necessity of improvement of reprocessing methods of wastes formed during purex-process. Valency states of Np in solutions of reprocessing cycles, Np distribution in organic and acid phases, Np(5) oxidation by nitric acid at the stage of extraction, effect of U and Pu presence on Np behaviour, are considered. Calculation and experimental data are compared; the possibility of Np behaviour forecasting in the process of nuclear fuel reprocessing, provided initial data vay, is shown. 7 refs.; 4 figs.; 1 tab

  3. Technical aspects of fuel reprocessing

    International Nuclear Information System (INIS)

    Groenier, W.S.

    1982-02-01

    The purpose of this paper is to present a brief description of fuel reprocessing and some present developments which show the reliability of nuclear energy as a long-term supply. The following topics are discussed: technical reasons for reprocessing; economic reasons for reprocessing; past experience; justification for advanced reprocessing R and D; technical aspects of current reprocessing development. The present developments are mainly directed at the reprocessing of breeder reactor fuels but there are also many applications to light-water reactor fuel reprocessing. These new developments involve totally remote operation, and maintenance. To demonstrate this advanced reprocessing concept, pilot-scale demonstration facilities are planned with commercial application occurring sometime after the year 2000

  4. The integral fast reactor fuels reprocessing laboratory at Argonne National Laboratory, Illinois

    International Nuclear Information System (INIS)

    Wolson, R.D.; Tomczuk, Z.; Fischer, D.F.; Slawecki, M.A.; Miller, W.E.

    1986-09-01

    The processing of Integral Fast Reactor (IFR) metal fuel utilizes pyrochemical fuel reprocessing steps. These steps include separation of the fission products from uranium and plutonium by electrorefining in a fused salt, subsequent concentration of uranium and plutonium for reuse, removal, concentration, and packaging of the waste material. Approximately two years ago a facility became operational at Argonne National Laboratory-Illinois to establish the chemical feasibility of proposed reprocessing and consolidation processes. Sensitivity of the pyroprocessing melts to air oxidation necessitated operation in atmosphere-controlled enclosures. The Integral Fast Reactor Fuels Reprocessing Laboratory is described

  5. Reprocessing on the whole fuel cycle operations

    International Nuclear Information System (INIS)

    Megy, J.

    1983-11-01

    Spent fuel reprocessing, in France, is become an industrial reality which takes an importance place in several fields: place surely essential in the fuel cycle from the energetic material economy and waste management point of view; place priority in the CEA (Commissariat a l'Energie Atomique) research and development programs; place in the industry where it is an important activity sector with the realizations in progress [fr

  6. Handling and storage of high-level liquid wastes from reprocessing of spent fuel

    International Nuclear Information System (INIS)

    Finsterwalder, L.

    1982-01-01

    The high level liquid wastes arise from the reprocessing of irradiated nuclear fuels, which are dissolved in aqueous acid solution, and the plutonium and unburned uranium removed in the chemical separation plant. The remaining solution, containing more than 99% of the dissolved fission products, together with impurities from cladding materials, corrosion products, traces of unseparated plutonium and uranium and most of the transuranic elements, constitutes the high-level waste. At present, these liquid wastes are usually concentrated by evaporation and stored as an aqueous nitric acid solution in high-integrity stainless-steel tanks. There is now world-wide agreement that, for the long term, these liquid wastes should be converted to solid form and much work is in progress to develop techniques for the solidification of these wastes. This paper considers the design requirements for such facilities and the experience gained during nearly 30 years of operation. (orig./RW)

  7. Assessment of lead tellurite glass for immobilizing electrochemical salt wastes from used nuclear fuel reprocessing

    Energy Technology Data Exchange (ETDEWEB)

    Riley, Brian J.; Kroll, Jared O.; Peterson, Jacob A.; Pierce, David A.; Ebert, William L.; Williams, Benjamin D.; Snyder, Michelle M. V.; Frank, Steven M.; George, Jaime L.; Kruska, Karen

    2017-11-01

    This paper provides an overview of research evaluating the use of lead tellurite glass as a waste form for salt wastes from electrochemical reprocessing of used nuclear fuel. The efficacy of using lead tellurite glass to immobilize three different salt compositions was evaluated: a LiCl-Li2O oxide reduction salt containing fission products from oxide fuel, a LiCl-KCl eutectic salt containing fission products from metallic fuel, and SrCl2. Physical and chemical properties of glasses made with these salts were characterized with X-ray diffraction, bulk density measurements, differential thermal analysis, chemical durability tests, scanning and transmission electron microscopies, and energy-dispersive X-ray spectroscopy. These glasses were found to accommodate high salt concentrations and have high densities, but further development is needed to improve chemical durability. (C) 2017 Published by Elsevier B.V.

  8. Considerations affecting deep-well disposal of tritium-bearing low-level aqueous waste from nuclear fuel reprocessing plants

    International Nuclear Information System (INIS)

    Trevorrow, L.E.; Warner, D.L.; Steindler, M.J.

    1977-03-01

    Present concepts of disposal of low-level aqueous wastes (LLAW) that contain much of the fission-product tritium from light water reactors involve dispersal to the atmosphere or to surface streams at fuel reprocessing plants. These concepts have been challenged in recent years. Deep-well injection of low-level aqueous wastes, an alternative to biospheric dispersal, is the subject of this presentation. Many factors must be considered in assessing its feasibility, including technology, costs, environmental impact, legal and regulatory constraints, and siting. Examination of these factors indicates that the technology of deep-well injection, extensively developed for other industrial wastes, would require little innovation before application to low-level aqueous wastes. Costs would be low, of the order of magnitude of 10 -4 mill/kWh. The environmental impact of normal deep-well disposal would be small, compared with dispersal to the atmosphere or to surface streams; abnormal operation would not be expected to produce catastrophic results. Geologically suitable sites are abundant in the U.S., but a well would best be co-located with the fuel-reprocessing plant where the LLAW is produced. Legal and regulatory constraints now being developed will be the most important determinants of the feasibility of applying the method

  9. Fuel reprocessing/fabrication interface

    International Nuclear Information System (INIS)

    Benistan, G.; Blanchon, T.; Galimberti, M.; Mignot, E.

    1987-01-01

    EDF has conducted a major research, development and experimental programme concerning the recycling of plutonium and reprocessed uranium in pressurized water reactors, in collaboration with its major partners in the nuclear fuel cycle industry. Studies already conducted have demonstrated the technical and economic advantages of this recycling, as also its feasibility with due observance of the safety and reliability criteria constantly applied throughout the industrial development of the nuclear power sector in France. Data feedback from actual experience will make it possible to control the specific technical characteristics of MOX and reprocessed uranium fuels to a higher degree, as also management, viewed from the economic standpoint, of irradiated fuels and materials recovered from reprocessing. The next step will be to examine the reprocessing of MOX for reprocessed uranium fuels, either for secondary recycling in the PWR units, or, looking further ahead, in the fast breeders or later generation PWR units, after a storage period of a few years

  10. Radiation effects in glass and glass-ceramic waste forms for the immobilization of CANDU UO{sub 2} fuel reprocessing waste

    Energy Technology Data Exchange (ETDEWEB)

    Tait, J C

    1993-05-01

    AECL has investigated three waste forms for the immobilization of high-level liquid wastes that would arise if used CANDU fuels were reprocessed at some time in the future to remove fissile materials for the fabrication of new power reactor fuel. These waste forms are borosilicate glasses, aluminosilicate glasses and titanosilicate glass-ceramics. This report discusses the potential effects of alpha, beta and gamma radiation on the releases of radionuclides from these waste forms as a result of aqueous corrosion by groundwaters that would be present in an underground waste disposal vault. The report discusses solid-state damage caused by radiation-induced atomic displacements in the waste forms as well as irradiation of groundwater solutions (radiolysis), and their potential effects on waste-form corrosion and radionuclide release. The current literature on radiation effects on borosilicate glasses and in ceramics is briefly reviewed, as are potential radiation effects on specialized waste forms for the immobilization of {sup 129}I, {sup 85}Kr and {sup 14}C. (author). 104 refs., 9 tabs., 5 figs.

  11. Trends in fuel reprocessing safety research

    International Nuclear Information System (INIS)

    Tsujino, Takeshi

    1981-01-01

    With the operation of a fuel reprocessing plant in the Power Reactor and Nuclear Fuel Development Corporation (PNC) and the plan for a second fuel reprocessing plant, the research on fuel reprocessing safety, along with the reprocessing technology itself, has become increasingly important. As compared with the case of LWR power plants, the safety research in this field still lags behind. In the safety of fuel reprocessing, there are the aspects of keeping radiation exposure as low as possible in both personnel and local people, the high reliability of the plant operation and the securing of public safety in accidents. Safety research is then required to establish the safety standards and to raise the rate of plant operation associated with safety. The following matters are described: basic ideas for the safety design, safety features in fuel reprocessing, safety guideline and standards, and safety research for fuel reprocessing. (J.P.N.)

  12. Removal of actinides from selected nuclear fuel reprocessing wastes

    International Nuclear Information System (INIS)

    Navratil, J.D.; Thompson, G.H.

    1979-01-01

    The US Department of Energy awarded Oak Ridge National Laboratory a program to develop a cost-risk-benefit analysis of partitioning long-lived nuclides from waste and transmuting them to shorter lived or stable nuclides. Two subtasks of this program were investigated at Rocky Flats. In the first subtask, methods for solubilizing actinides in incinerator ash were tested. Two methods appear to be preferable: reaction with ceric ion in nitric acid or carbonate-nitrate fusion. The ceric-nitric acid system solubilizes 95% of the actinides in ash; this can be increased by 2 to 4% by pretreating ash with sodium hydroxide to solubilize silica. The carbonate-nitrate fusion method solubilizes greater than or equal to 98% of the actinides, but requires sodium hydroxide pretreatment. Two additional disadvantages are that it is a high-temperature process, and that it generates a lot of salt waste. The second subtask comprises removing actinides from salt wastes likely to be produced during reactor fuel fabrication and reprocessing. A preliminary feasibility study of solvent extraction methods has been completed. The use of a two-step solvent extraction system - tributyl phosphate (TBP) followed by extraction with a bidentate organophosphorous extractant (DHDECMP) - appears to be the most efficient for removing actinides from salt waste. The TBP step would remove most of the plutonium and > 99.99% of the uranium. The second step using DHDECMP would remove > 99.91% of the americium and the remaining plutonium (> 99.98%) and other actinides from the acidified salt waste. 8 figures, 11 tables

  13. Thoria-based nuclear fuels thermophysical and thermodynamic properties, fabrication, reprocessing, and waste management

    CERN Document Server

    Bharadwaj, S R

    2013-01-01

    This book presents the state of the art on thermophysical and thermochemical properties, fabrication methodologies, irradiation behaviours, fuel reprocessing procedures, and aspects of waste management for oxide fuels in general and for thoria-based fuels in particular. The book covers all the essential features involved in the development of and working with nuclear technology. With the help of key databases, many of which were created by the authors, information is presented in the form of tables, figures, schematic diagrams and flow sheets, and photographs. This information will be useful for scientists and engineers working in the nuclear field, particularly for design and simulation, and for establishing the technology. One special feature is the inclusion of the latest information on thoria-based fuels, especially on the use of thorium in power generation, as it has less proliferation potential for nuclear weapons. Given its natural abundance, thorium offers a future alternative to uranium fuels in nuc...

  14. Public comments and Task Force responses regarding the environmental survey of the reprocessing and waste management portions of the LWR fuel cycle

    International Nuclear Information System (INIS)

    1977-03-01

    This document contains responses by the NRC Task Force to comments received on the report ''Environmental Survey of the Reprocessing and Waste Management Portions of the LWR Fuel Cycle'' (NUREG-0116). These responses are directed at all comments, inclding those received after the close of the comment period. Additional information on the environmental impacts of reprocessing and waste management which has either become available since the publication of NUREG-0116 or which adds requested clarification to the information in that document

  15. R and D on fast reactor fuel reprocessing

    International Nuclear Information System (INIS)

    Subba Rao, R.V.; Vijaya Kumar, V.; Natarajan, R.

    2012-01-01

    Development of Fast Reactor Fuel Reprocessing technology, with low out of pile inventory, is carried out at the Indira Gandhi Centre for Atomic Research (IGCAR). Based on the successful R and D programme which addressed specific issues of fast reactor fuels, a pilot plant called CORAL was set up. This plant is operational since 2003 and several reprocessing campaigns with spent FBTR fuels of varying burnups have been carried out. Based on the valuable operating experience of CORAL, the design of demonstration fast reactor fuel reprocessing plant (DFRP) and the commercial reprocessing plant, FRP have been taken up. Concurrently R and D efforts are continuing for improving the process and equipment performance apart from reducing the waste volumes and the radiation exposures to the operating personnel. Some important R and D efforts are highlighted in the paper. Reducing the dissolution time is one of the vital area of investigation especially for the high plutonium bearing MOX fuels which are known to dissolve slowly. To address this as well as criticality issues, continuous dissolvers are being developed. Solvent extraction based process is employed for getting highly pure nuclear grade uranium and plutonium. In view of the lower cooling time the fission product activity in the spent fuel is higher, formulation of process flowsheet with reduced number of solvent extraction cycles to improve the decontamination of ruthenium and zirconium without the formation of second organic phase due to plutonium loading, is under investigation. Retention of plutonium in lean organic is another issue to be addressed as otherwise it would lead to further deterioration of the solvent on storage. Several reagents to effectively wash the lean solvent have been investigated and flowsheets have been formulated to recover the retained plutonium with minimum secondary wastes. Partitioning of uranium and plutonium is an important step and methods reported in the literature have inherent

  16. Economic analysis of waste management alternatives for reprocessing wastes

    International Nuclear Information System (INIS)

    McKee, R.W.; Clark, L.L.; Daling, P.M.; Nesbitt, J.F.; Swanson, J.L.

    1984-02-01

    This study describes the results of a cost analysis of a broad range of alternatives for management of reprocessing wastes that would require geologic repository disposal. The intent was to identify cost-effective alternatives and the costs of potential repository performance requirements. Four integrated treatment facility alternatives for transuranic (TRU) wastes are described and compared. These include no treatment, compaction, incineration, and hulls melting. The advantages of reducing high-level wastes (HLW) volume are also evaluated as are waste transportation alternatives and several performance-related alternatives for emplacing waste in a basalt repository. Results show (1) that system costs for disposal of reprocessing waste are likely to be higher than those for disposal of spent fuel; (2) that volume reduction is cost-effective for both remote-handled (RH) TRU wastes and HLW, and that rail transport for HLW is more cost-effective than truck transport; (3) that coemplacement of RH-TRU wastes with HLW does not have a large cost advantage in a basalt repository; and (4) that, relative to performance requirements, the cost impact for elimination of combustibles is about 5%, long-lived containers for RH-TRU wastes can increase repository costs 10% to 20%, and immediate backfill compared to delayed backfill (bentonite/basalt) around the HLW canisters would increase repository costs up to 10% or overall system costs up to about 5%. 13 references, 4 figures, 12 tables

  17. Biodegradation of radioactive organic liquid waste from spent fuel reprocessing

    International Nuclear Information System (INIS)

    Ferreira, Rafael Vicente de Padua

    2008-01-01

    The research and development program in reprocessing of low burn-up spent fuel elements began in Brazil in 70's, originating the lab-scale hot cell, known as Celeste located at Nuclear and Energy Research Institute, IPEN - CNEN/SP. The program was ended at the beginning of 90's, and the laboratory was closed down. Part of the radioactive waste generated mainly from the analytical laboratories is stored waiting for treatment at the Waste Management Laboratory, and it is constituted by mixture of aqueous and organic phases. The most widely used technique for the treatment of radioactive liquid wastes is the solidification in cement matrix, due to the low processing costs and compatibility with a wide variety of wastes. However, organics are generally incompatible with cement, interfering with the hydration and setting processes, and requiring pre -treatment with special additives to stabilize or destroy them. The objective of this work can be divided in three parts: organic compounds characterization in the radioactive liquid waste; the occurrence of bacterial consortia from Pocos de Caldas uranium mine soil and Sao Sebastiao estuary sediments that are able to degrade organic compounds; and the development of a methodology to biodegrade organic compounds from the radioactive liquid waste aiming the cementation. From the characterization analysis, TBP and ethyl acetate were chosen to be degraded. The results showed that selected bacterial consortia were efficient for the organic liquid wastes degradation. At the end of the experiments the biodegradation level were 66% for ethyl acetate and 70% for the TBP. (author)

  18. Nuclear safety in fuel-reprocessing plants

    International Nuclear Information System (INIS)

    Hennies, H.H.; Koerting, K.

    1976-01-01

    The danger potential of nuclear power and fuel reprocessing plants in normal operation is compared. It becomes obvious that there are no basic differences. The analysis of possible accidents - blow-up of an evaporator for highly active wastes, zircaloy burning, cooling failure in self-heating process solutions, burning of a charged solvent, criticality accidents - shows that they are kept under control by the plant layout. (HP) [de

  19. Public comments and Task Force responses regarding the environmental survey of the reprocessing and waste management portions of the LWR fuel cycle

    Energy Technology Data Exchange (ETDEWEB)

    1977-03-01

    This document contains responses by the NRC Task Force to comments received on the report ''Environmental Survey of the Reprocessing and Waste Management Portions of the LWR Fuel Cycle'' (NUREG-0116). These responses are directed at all comments, inclding those received after the close of the comment period. Additional information on the environmental impacts of reprocessing and waste management which has either become available since the publication of NUREG-0116 or which adds requested clarification to the information in that document.

  20. Cost and availability of gadolinium for nuclear fuel reprocessing plants

    International Nuclear Information System (INIS)

    Klepper, O.H.

    1985-06-01

    Gadolinium is currently planned for use as a soluble neutron poison in nuclear fuel reprocessing plants to prevent criticality of solutions of spent fuel. Gadolinium is relatively rare and expensive. The present study was undertaken therefore to estimate whether this material is likely to be available in quantities sufficient for fuel reprocessing and at reasonable prices. It was found that gadolinium, one of 16 rare earth elements, appears in the marketplace as a by-product and that its present supply is a function of the production rate of other more prevalent rare earths. The potential demand for gadolinium in a fuel reprocessing facility serving a future fast reactor industry amounts to only a small fraction of the supply. At the present rate of consumption, domestic supplies of rare earths containing gadolinium are adequate to meet national needs (including fuel reprocessing) for over 100 years. With access to foreign sources, US demands can be met well beyond the 21st century. It is concluded therefore that the supply of gadolinium will quite likely be more than adequate for reprocessing spent fuel for the early generation of fast reactors. The current price of 99.99% pure gadolinium oxide lies in the range $50/lb to $65/lb (1984 dollars). By the year 2020, in time for reprocessing spent fuel from an early generation of large fast reactors, the corresponding values are expected to lie in the $60/lb to $75/lb (1984 dollars) price range. This increase is modest and its economic impact on nuclear fuel reprocessing would be minor. The economic potential for recovering gadolinium from the wastes of nuclear fuel reprocessing plants (which use gadolinium neutron poison) was also investigated. The cost of recycled gadolinium was estimated at over twelve times the cost of fresh gadolinium, and thus recycle using current recovery technology is not economical. 15 refs., 4 figs., 11 tabs

  1. Survey of economics of spent nuclear fuel reprocessing

    International Nuclear Information System (INIS)

    Valvoda, Z.

    1976-01-01

    Literature data are surveyed on the economic problems of reprocessing spent fuel from light-water reactors in the period 1970 to 1975 and on the capacity of some reprocessing plants, such as NFS, Windscale, Marcoule, etc. The sharp increase in capital and production costs is analyzed and the future trend is estimated. The question is discussed of the use of plutonium and the cost thereof. The economic advantageousness previously considered to be the primary factor is no longer decisive due to new circumstances. The main objective today is to safeguard uninterrupted operation of nuclear power plants and the separation of radioactive wastes from the fuel cycle and the safe disposal thereof. (Oy)

  2. Consolidated fuel reprocessing program

    Science.gov (United States)

    1985-04-01

    A survey of electrochemical methods applications in fuel reprocessing was completed. A dummy fuel assembly shroud was cut using the remotely operated laser disassembly equipment. Operations and engineering efforts have continued to correct equipment operating, software, and procedural problems experienced during the previous uranium compaigns. Fuel cycle options were examined for the liquid metal reactor fuel cycle. In high temperature gas cooled reactor spent fuel studies, preconceptual designs were completed for the concrete storage cask and open field drywell storage concept. These and other tasks operating under the consolidated fuel reprocessing program are examined.

  3. Status of power reactor fuel reprocessing in India

    International Nuclear Information System (INIS)

    Kansra, V.P.

    1999-01-01

    Spent fuel reprocessing in India started with the commissioning of the Trombay Plutonium Plant in 1964. This plant was intended for processing spent fuel from the 40 MWth research reactor CIRUS and recovering plutonium required for the research and development activities of the Indian Atomic Energy programme. India's nuclear energy programme aims at the recycle of plutonium in view of the limited national resources of natural uranium and abundant quantities of thorium. This is based on the approach which aims at separating the plutonium from the power reactor spent fuel, use it in the fast reactors to breed 233 U and utilise the 233 U generated to sustain a virtually endless source of power through thorium utilisation. The separated plutonium is also being utilised to fabricate MOX fuel for use in thermal reactors. Spent fuel treatment and extracting plutonium from it makes economic sense and a necessity for the Indian nuclear power programme. This paper describes the status and trends in the Indian programme for the reprocessing of power reactor fuels. The extraction of plutonium can also be seen as a far more positive approach to long-term waste management. The closed cycle approach visualised and pursued by the pioneers in the field is now steadily moving India towards the goal of a sustainable source of power through nuclear energy. The experience in building, operating and refurbishing the reprocessing facilities for uranium and thorium has resulted in acquiring the technological capability for designing, constructing, operating and maintaining reprocessing plants to match India's growing nuclear power programme. (author)

  4. The regulations concerning the reprocessing business of spent fuels

    International Nuclear Information System (INIS)

    1979-01-01

    The regulations are defined under provisions concerning the reprocessing business in the law for the regulations of nuclear source materials, nuclear fuel materials and reactors. The basic concepts and terms are explained, such as: exposure dose; accumulative dose; controlled area; safeguarded area; inspected surrounding area; employee; radioactive waste and marine discharging facilities. Any person who gets permission for design of reprocessing facilities and method of the construction shall file an application, listing name and address of the person and the works or the place of enterprise where reprocessing facilities are to be set up, design of such facilities and method of the construction, in and out-put chart of nuclear fuel materials in reprocessing course, etc. Records shall be made and kept for particularly periods in each works or enterprise on inspection of reprocessing facilities, control of dose, operation, maintenance, accident of reprocessing facilities and weather. Detailed prescriptions are settled on entrance limitation to controlled area, exposure dose, inspection and check, regular independent examination and operation of reprocessing facilities, transportation in the works or the enterprise, storage, disposal, safeguard and measures in dangerous situations, etc. Reports shall be filed on exposure dose of employees and other specified matters in the forms attached and in the case otherwise defined. (Okada, K.)

  5. Reasons for and against reprocessing of spent fuel elements

    Energy Technology Data Exchange (ETDEWEB)

    Gries, W

    1983-06-01

    In the following the reasons for and against the main methods of waste disposal are compared. The author examines the advantages and disadvantages of waste disposal by reprocessing of spent fuel assemblies or by immediate ultimate storage. To get a general idea the pros and cons are arranged and analysed according to the following subjects: - technology/science, - safety/environment, - profitability, - political aspects.

  6. Fuel reprocessing and environmental problem

    International Nuclear Information System (INIS)

    Ichikawa, Ryushi

    1977-01-01

    The radioactive nuclides which are released from the reprocessing plants of nuclear fuel are 137 Cs, 106 Ru, 95 Zr and 3 H in waste water and 85 Kr in the atmosphere. This release affects the environment for example, the reprocessing plant of the Nuclear Fuel Service Co in the USA releases about 2 x 10 5 Ci/y of 85 Kr, which is evaluated as about 0.025 mr/y as external exposure dose. The radioactivity in milk around this plant was measured as less than 10 pCi/lit of 129sup(I. The radioactive concentration in the sea, especially in fish and shellfish, was measured near the reprocessing plant of Windscale in UK. The radioactive release rate from this plants more than 10)5sup( Ci/y as the total amount of )137sup(Cs, )3sup(H, )106sup(Ru, )95sup(Zr, )95sup(Nb, )90sup(Sr, )144sup(Ce, etc., and the radioactivity in seaweeds near Windscale is about 400 pCi/g as the maximum value, and the mayonnaise which was made of this seaweeds contained about 1 pCi/g of )106sup(Ru, which is estimated as about 7 mr/y for the digestive organ if 100 g is eaten every day. On the other hand, the experimental result is presented for the reprocessing plant of La Hague in France, in which the radioactive release rate from this plant is about 10)4sup( Ci/y, and the radioactivity in sea water and shellfish is about 4 pCi/l of )106sup(Ru and about 400 pCi/kg of )137 Cs, respectively, near this plant. The philosophy of ALAP (as low as practicable) is also applied to reprocessing plants. (Nakai, Y.)

  7. Method of reprocessing spent nuclear fuels

    International Nuclear Information System (INIS)

    Kamiyama, Hiroaki; Inoue, Tadashi; Miyashiro, Hajime.

    1987-01-01

    Purpose: To facilitate the storage management for the wastes resulting from reprocessing by chemically separating transuranium elements such as actionoid elements together with uranium and plutonium. Method: Spent fuels from a nuclear reactor are separated into two groups, that is, a mixture of uranium, plutonium and transuranium elements and cesium, strontium and other nuclear fission products. Virgin uranium is mixed to adjust the mixture of uranium, plutonium and transuranium elements in the first group, which is used as the fuels for the nuclear reactor. After separating to recover useful metals such as cesium and strontium are separated from short half-decay nuclear fission products of the second group, other nuclear fission products are stored and managed. This enables to shorten the storage period and safety storage and management for the wastes. (Takahashi, M.)

  8. Electrochemical Methods for Reprocessing Defective Fuel Elements and for Decontaminating Equipment

    International Nuclear Information System (INIS)

    Mikheykin, S. V.; Rybakov, K. A.; Simonov, V. P.

    2002-01-01

    Reprocessing of fuel elements receives much consideration in nuclear engineering. Chemical and electrochemical methods are used for the purpose. For difficultly soluble materials based on zirconium alloys chemical methods are not suitable. Chemical reprocessing of defective or irradiated fuel elements requires special methods for their decladding because the dissolution of the clad material in nitric acid is either impossible (stainless steel, Zr alloys) or quite slow (aluminium). Fuel elements are cut in air-tight glove-boxes equipped with a dust collector and a feeder for crushed material. Chemical treatment is not free from limitations. For this reason we started a study of the feasibility of electrochemical methods for reprocessing defective and irradiated fuel elements. A simplified electrochemical technology developed makes it possible to recover expensive materials which were earlier wasted or required multi-step treatment. The method and an electrochemical cell are suitable for essentially complete dissolution of any fuel elements, specifically those made of materials which are difficultly soluble by chemical methods

  9. Problems of nuclear fuel reprocessing in Japan

    International Nuclear Information System (INIS)

    Tanaka, Naojiro

    1974-01-01

    The reprocessing capacity of the plant No. 1 of Power Reactor and Nuclear Fuel Development Corporation, which is scheduled to start operation in fiscal year 1975, will be insufficient after fiscal year 1978 for the estimated demand for reprocessing based on Japanese nuclear energy development program. Taking into consideration the results examined by JAIF's study team to Europe and the U.S., it is necessary that Japan builds 2nd reprocessing plant. But there will be a gap from 1978 to 1984 during which Japan must rely on overseas reprocessing services. The establishment of a reprocessing system is a task of national scale, and there are many problems to be solved before it can be done. These include the problems of site and environment, the problem of treatment and disposal of radioactive wastes, the raising of huge required funds and so on. Therefore, even if a private enterprise is allowed to undertake the task, it will be impossible to achieve the aim without the cooperation and assistance of the government. (Wakatsuki, Y.)

  10. Reprocessing in the thorium fuel cycle

    International Nuclear Information System (INIS)

    Merz, E.

    1984-01-01

    An overview of the authors personal view is presented on open questions in regard to still required research and development work for the thorium fuel cycle before its application in a technical-industrial scale may be tackled. For a better understanding, all stations of the back-end of the thorium fuel cycle are briefly illustrated and their special features discussed. They include storage and transportation measures, all steps of reprocessing, as well as the entire radioactive waste treatment. Knowledge gaps are, as far as they are obvious, identified and proposals put forward for additional worthwile investigations. (orig.) [de

  11. Prolixe-prototype reprocessing unit for irradiating wastes contamined with alpha emitters

    International Nuclear Information System (INIS)

    Madic, C.; Sontag, R.

    1987-01-01

    A large number of hot cells are employed for research on nuclear fuel reprocessing and the production of isotope of transuranium elements. These activities generate solid wastes highly contaminated with alpha, beta, gamma emitters. The Prolixe hot cell was built in order to: 1/ reprocess the solid wastes contaminated with alpha, beta, gamma emitters produced in the Radiochemistry building: 2/ produce package wastes storable in shallow-ground disposal sites: 3/ develop a process sufficiently flexible to make it applicable to waste produced in other installations. The process is based on waste leaching after grinding. Depending on the type of wastes the leaching reactant will have a different composition 1/ nitric acid solution for cellulose waste: 2/ nitric solutions containing Ag(II) for other material. The complete process should achieve: 1/ a high waste volume reduction factor: 2/ the production of immobilized waste packages storage in shallow-ground disposal sites: 3/ the recycling of transuranium elements: 4/ the generation of a minimal volume of effluents. This process can be considered as an alternative process to incineration for the reprocessing of solid wastes highly contaminated with alpha, beta, gamma emitters

  12. Fuel cycle and waste management: A perspective from British nuclear fuels plc

    International Nuclear Information System (INIS)

    Holmes, R.G.G.; Fairhall, G.A.; Robbins, R.A.

    1996-01-01

    The phrase fuel cycle and waste management implies two separate and distinct activities. British Nuclear Fuels plc (BNFL) has adopted a holistic approach to the fuel cycle that integrates the traditional fuel cycle activities of conversion to uranium hexafluoride, fuel fabrication, power generation, and reprocessing with waste arisings, its subsequent treatment, and disposal

  13. Nuclear fuel reprocessing in the UK

    International Nuclear Information System (INIS)

    Allardice, R.; Harris, D.; Mills, A.

    1983-01-01

    Nuclear fuel reprocessing has been carried out on an industrial scale in the United Kingdom since 1952. Two large reprocessing plants have been constructed and operated at Windscale, Cumbria and two smaller specialized plants have been constructed and operated at Dounreay, Northern Scotland. At the present time, the second of the two Windscale plants is operating, and Government permission has been given for a third reprocessing plant to be built on that site. At Dounreay, one of the plants is operating in its original form, whilst the second is now operating in a modified form, reprocessing fuel from the prototype fast reactor. This chapter describes the development of nuclear fuel reprocessing in the UK, commencing with the research carried out in Canada immediately after the Second World War. A general explanation of the techniques of nuclear fuel reprocessing and of the equipment used is given. This is followed by a detailed description of the plants and processes installed and operated in the UK

  14. Nuclear fuel reprocessing in the UK

    International Nuclear Information System (INIS)

    Allardice, R.H.; Harris, D.W.; Mills, A.

    1983-01-01

    Nuclear fuel reprocessing has been carried out on an industrial scale in the United Kingdom since 1952. Two large reprocessing plants have been constructed and operated at Windscale, Cumbria and two smaller specialized plants have been constructed and operated at Dounreay, Northern Scotland. At the present time, the second of the two Windscale plants is operating, and Government permission has been given for a third reprocessing plant to be built on that site. At Dounreay, one of the plants is operating in its original form, whilst the second is now operating in a modified form, reprocessing fuel from the prototype fast reactor. This chapter describes the development of nuclear fuel reprocessing in the UK, commencing with the research carried out in Canada immediately after the Second World War. A general explanation of the techniques of nuclear fuel reprocessing and of the equipment used is given. This is followed by a detailed description of the plants and processes installed and operated in the UK. (author)

  15. High temperature gas-cooled reactor (HTGR) graphite pebble fuel: Review of technologies for reprocessing

    Energy Technology Data Exchange (ETDEWEB)

    Mcwilliams, A. J. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-09-08

    This report reviews literature on reprocessing high temperature gas-cooled reactor graphite fuel components. A basic review of the various fuel components used in the pebble bed type reactors is provided along with a survey of synthesis methods for the fabrication of the fuel components. Several disposal options are considered for the graphite pebble fuel elements including the storage of intact pebbles, volume reduction by separating the graphite from fuel kernels, and complete processing of the pebbles for waste storage. Existing methods for graphite removal are presented and generally consist of mechanical separation techniques such as crushing and grinding chemical techniques through the use of acid digestion and oxidation. Potential methods for reprocessing the graphite pebbles include improvements to existing methods and novel technologies that have not previously been investigated for nuclear graphite waste applications. The best overall method will be dependent on the desired final waste form and needs to factor in the technical efficiency, political concerns, cost, and implementation.

  16. Fast reactor fuel reprocessing. An Indian perspective

    International Nuclear Information System (INIS)

    Natarajan, R.; Raj, Baldev

    2005-01-01

    The Department of Atomic Energy (DAE) envisioned the introduction of Plutonium fuelled fast reactors as the intermediate stage, between Pressurized Heavy Water Reactors and Thorium-Uranium-233 based reactors for the Indian Nuclear Power Programme. This necessitated the closing of the fast reactor fuel cycle with Plutonium rich fuel. Aiming to develop a Fast Reactor Fuel Reprocessing (FRFR) technology with low out of pile inventory, the DAE, with over four decades of operating experience in Thermal Reactor Fuel Reprocessing (TRFR), had set up at the India Gandhi Center for Atomic Research (IGCAR), Kalpakkam, R and D facilities for fast reactor fuel reprocessing. After two decades of R and D in all the facets, a Pilot Plant for demonstrating FRFR had been set up for reprocessing the FBTR (Fast Breeder Test Reactor) spent mixed carbide fuel. Recently in this plant, mixed carbide fuel with 100 GWd/t burnup fuel with short cooling period had been successfully reprocessed for the first time in the world. All the challenging problems encountered had been successfully overcome. This experience helped in fine tuning the designs of various equipments and processes for the future plants which are under construction and design, namely, the DFRP (Demonstration Fast reactor fuel Reprocessing Plant) and the FRP (Fast reactor fuel Reprocessing Plant). In this paper, a comprehensive review of the experiences in reprocessing the fast reactor fuel of different burnup is presented. Also a brief account of the various developmental activities and strategies for the DFRP and FRP are given. (author)

  17. Cost analysis of the US spent nuclear fuel reprocessing facility

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, E.A.; Deinert, M.R. [Department of Mechanical Engineering, University of Texas, Austin TX (United States); Cady, K.B. [Department of Theoretical and Applied Mechanics, Cornell University, Ithaca NY (United States)

    2009-09-15

    The US Department of Energy is actively seeking ways in which to delay or obviate the need for additional nuclear waste repositories beyond Yucca Mountain. All of the realistic approaches require the reprocessing of spent nuclear fuel. However, the US currently lacks the infrastructure to do this and the costs of building and operating the required facilities are poorly established. Recent studies have also suggested that there is a financial advantage to delaying the deployment of such facilities. We consider a system of government owned reprocessing plants, each with a 40 year service life, that would reprocess spent nuclear fuel generated between 2010 and 2100. Using published data for the component costs, and a social discount rate appropriate for intergenerational analyses, we establish the unit cost for reprocessing and show that it increases slightly if deployment of infrastructure is delayed by a decade. The analysis indicates that achieving higher spent fuel discharge burnup is the most important pathway to reducing the overall cost of reprocessing. The analysis also suggests that a nuclear power production fee would be a way for the US government to recover the costs in a manner that is relatively insensitive to discount and nuclear power growth rates. (author)

  18. Why reprocess

    International Nuclear Information System (INIS)

    Greenwood, T.

    1977-01-01

    Prospective costs of reprocessing, waste management, and mixed oxide fuel fabrication have risen so much that the costs of U/P recycle and of spent fuel storage are nearly equal. This paper reviews the current state of the reprocessing industry, with a list of facilities all over the world, and examines the incentives and disincentives other than short-term economics that will affect the decision of states to acquire their own reprocessing facilities. Finally, it examines the possibility of avoiding a widespread commercial reprocessing industry

  19. Energies and media nr 30. Conditions for the nuclear sector. The fuel cycle and wastes. The usefulness of fuel reprocessing. Wastes; Energies et medias no. 30. La conjoncture, pour le nucleaire. Le cycle du combustible et les dechets. L'utilite du retraitement des combustibles. Les dechets

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-10-15

    After some comments on recent events in the nuclear sector in different countries (energy policy and projects in the USA, Europe, China, India, Russia), this issue proposes some explanations on the nuclear fuel cycle and on nuclear wastes: involved processes and products from mining to reprocessing and recycling, usefulness of reprocessing (future opportunities of fast neutron reactors, present usefulness of reprocessing with the recycling of separated fissile materials), impact of reprocessing on the environment in La Hague (gas and liquid releases, release standard definition), and the destiny of wastes

  20. Description of solid waste expected from a large commercial reprocessing plant

    International Nuclear Information System (INIS)

    Keely, R.B.

    1979-01-01

    Both low-level and high-level solid wastes generated during reprocessing of spent nuclear fuel are characterized in this paper with respect to source, quantity, content, radioactivity, potential volume reduction, and transuranic content

  1. Management of radioactive waste from reprocessing including disposal aspects

    International Nuclear Information System (INIS)

    Malherbe, J.

    1991-01-01

    Based on a hypothetical scenario including a reactor park of 20 GWe consisting of Pressurised-Water-Reactors with a resulting annual production of 600 tonnes of heavy metal of spent fuel, all aspects of management of resulting wastes are studied. Waste streams from reprocessing include gaseous and liquid effluents, and a number of solid conditioned waste types. Disposal of waste is supposed to be performed either in a near-surface engineered repository, as long as the content of alpha-emitting radionuclides is low enough, and in a deep geological granite formation. After having estimated quantities, cost and radiological consequences, the sensitivity of results to modification in reactor park size, burn-up and the introduction of mixed-oxide fuel (MOX) is evaluated

  2. Indian experience in fuel reprocessing

    International Nuclear Information System (INIS)

    Prasad, A.N.; Kumar, S.V.

    1977-01-01

    Plant scale experience in fuel reprocessing in India was started with the successful design, execution and commissioning of the Trombay plant in 1964 to reprocess aluminium clad metallic uranium fuel from the 40 MWt research reactor. The plant has helped in generating expertise and trained manpower for future reprocessing plants. With the Trombay experience, a larger plant of capacity 100 tonnes U/year to reprocess spent oxide fuels from the Tarapur (BWR) and Rajasthan (PHWR) power reactors has been built at Tarapur which is undergoing precommissioning trial runs. Some of the details of this plant are dealt with in this paper. In view of the highly corrosive chemical attack the equipment and piping are subjected to in a fuel reprocessing plant, some of them require replacement during their service if the plant life has to be extended. This calls for extensive decontamination for bringing the radiation levels low enough to establish direct accesss to such equipment. For making modifications in the plant to extend its life and also to enable expansion of capacity, the Trombay plant has been successfully decontaminated and partially decommissioned. Some aspects of thi decontamination campaign are presented in this paper

  3. Direction of reprocessing technology development based on 30 years operation of Tokai reprocessing plant

    International Nuclear Information System (INIS)

    Nomura, S; Tanaka, T.; Ohshima, H.

    2006-01-01

    Full text: Full text: Recent global interest focuses the possibility of recycling of spent fuel with advanced fast reactor fuel cycle system. Goal of closed fuel cycle is to achieve the maximum use of uranium resources and minimum disposal of waste by multi recycle of TRU as a competitive nuclear energy system. The future reprocessing and fuel fabrication system should be synchronized completely with the advanced reactor system and waste treatment and disposal back-end system to complete closed fuel cycle. To realize such system, current reprocessing system should be changed to handle Pu-U-Minor Actinide with more reductions in the cost and less waste volume, as well as an inherent proliferation resistance. For the successful industrialization of advanced reprocessing technology, it is necessary to combine three key elements of R and D efforts, engineering base demonstration and experiences of plant operation. Tokai Reprocessing Facilities licensed a maximum capacity of 0.7tHM/day began a hot operation in 1977 and reprocessed l,100tHM U02 spent fuel and 20tHM ATR-MOX with a continuous technological improvements under IAEA full scope safeguards. With 30 years experience, candidate of key technologies proposed for realizing the next advanced reprocessing are as follows: 1) Simplified co-extraction process of Pu-Np-U by using multistage centrifugal extractors in stead of pulsed columns; 2) Corrosion free components in acid condition by using corrosion resistant refractory alloys and ceramics; 3) Co-conversion technology to MA containing MOX powder by micro-wave heating method for a short process for MA containing MOX pellets fabrication; 4) Advanced verification of high level radioactive liquid waste combining separation technology of TRU and LLFP elements; 5) Advanced chemical analysis and monitoring system for TRU elements in a plant. These advanced reprocessing technologies will be applied mainly to reprocess the LWR spent fuel accumulated past and future

  4. A review of reprocessing, partitioning, and transmutation of spent nuclear fuel and the implications for Canada

    International Nuclear Information System (INIS)

    Jackson, D.P.

    2006-01-01

    The current status of the reprocessing, partitioning, and transmutation of used nuclear fuel are reviewed in the context of assessing the possible application of these technologies to used CANDU fuel. The status of commercial reprocessing is briefly surveyed and recent progress in world R and D programs on the transmutation of FP's and actinides using Accelerator Driven Systems is summarized. The implications of reprocessing for Canada are explored from the point of view of a long strategy for managing used CANDU fuel in terms of the costs of initiating reprocessing domestically at some time in the future including public and occupational radiation doses, and the wastes generated. (author)

  5. Waste arisings from a high-temperature reactor with a uranium-thorium fuel cycle

    International Nuclear Information System (INIS)

    1979-09-01

    This paper presents an equilibrium-recycle condition flow sheet for a high-temperature gas-cooled reactor (HTR) fuel cycle which uses thorium and high-enriched uranium (93% U-235) as makeup fuel. INFCE Working Group 7 defined percentage losses to various waste streams are used to adjust the heavy-element mass flows per gigawatt-year of electricity generated. Thorium and bred U-233 are recycled following Thorex reprocessing. Fissile U-235 is recycled one time following Purex reprocessing and then is discarded to waste. Plutonium and other transuranics are discarded to waste. Included are estimates of volume, radioactivity, and heavy-element content of wastes arising from HTR fuel element fabrication; HTR operation, maintenance, and decommissioning; and reprocessing spent fuel where the waste is unique to the HTR fuel cycle

  6. The reasons for and against reprocessing of spent fuel elements

    International Nuclear Information System (INIS)

    Gries, W.

    1983-01-01

    In the following the reasons for and against the main methods of waste disposal are compred. The author examines the advantages and disadvantages of waste disposal by reprocessing of spent fuel assemblies or by immediate ultimate storage. To get a general idea the pros and cons are arranged and analysed according to the following subjects: - technology/science, - safety/environment, - profitability, - political aspects. (orig./UA) [de

  7. Long-term α-hazard of high activity waste from nuclear fuel reprocessing

    International Nuclear Information System (INIS)

    Girardi, F.; Bertozzi, G.

    1974-01-01

    The concentration and decay of α-emitters in high activity waste arising from spent nuclear fuel reprocessing was calculated under specified reference conditions. An attempt to evaluate the long-term hazard of such waste is being made by applying the ''barrier'' approach derived from reactor safety studies. Four barriers were identified, which could be evaluated in a probabilistic way by taking into account the great uncertainties present in each of them. The barriers are: 1) quality of the segregation afforded by deep geological formations, 2) stability of conditioned waste (chemical and physical), 3) retention by immediate surrounding, 4) distribution pattern of actinides in the environment. The analysis of a fictional accident showed that the uncertainties connected with the evaluation of the barriers' value are rather large. Additional studies particularly on the stability of conditioned waste and ecological properties of the environment towards actinides, would considerably improve our knowledge of the value of the barrier system. Chemical separation of actinides from high activity waste would be an additional option of undoubted value for the disposal of high activity waste. Its value for the overall safety of the entire waste inventory depends on many factors which need better evaluation, such as safety of the disposal of the separated actinides and the amount and quality of the additional waste generated by the separation process. An analysis of various levels of possible separations suggests that a reasonable target might be: Pu, Am and Cm, decontamination factor 10 3 ; Np, coextraction with U and Pu with a 90% yield

  8. Fast breeder reactor fuel reprocessing in France

    International Nuclear Information System (INIS)

    Bourgeois, M.; Le Bouhellec, J.; Eymery, R.; Viala, M.

    1984-08-01

    Simultaneous with the effort on fast breeder reactors launched several years ago in France, equivalent investigations have been conducted on the fuel cycle, and in particular on reprocessing, which is an indispensable operation for this reactor. The Rapsodie experimental reactor was associated with the La Hague reprocessing plant AT1 (1 kg/day), which has reprocessed about one ton of fuel. The fuel from the Phenix demonstration reactor is reprocessed partly at the La Hague UP2 plant and partly at the Marcoule pilot facility, undergoing transformation to reprocess all the fuel (TOR project, 5 t/y). The fuel from the Creys Malville prototype power plant will be reprocessed in a specific plant, which is in the design stage. The preliminary project, named MAR 600 (50 t/y), will mobilize a growing share of the CEA's R and D resources, as the engineering needs of the UP3 ''light water'' plant begins to decline. Nearly 20 tonnes of heavy metals irradiated in fast breeder reactors have been processed in France, 17 of which came from Phenix. The plutonium recovered during this reprocessing allowed the power plant cycle to be closed. This power plant now contains approximately 140 fuel asemblies made up with recycled plutonium, that is, more than 75% of the fuel assemblies in the Phenix core

  9. Risk analysis methodology for spent fuel repositories in bedded salt: methodlogy summary and differences between spent fuel and high level wastes

    International Nuclear Information System (INIS)

    Pepping, R.E.; Chu, M.S.

    1981-06-01

    In the absence of spent fuel reprocessing plans, unreprocessed spent fuel has become a candidate waste form for geologic disposal. In order to understand the public health risks from such disposal and to gain insights into the factors that influence them, a methodology is needed to combine the effects of site geology and hydrology, physical and chemical properties of the waste form, and the details of the engineering design. This report outlines such a methodology which the authors currently are applying to the analysis of unreprocessed spent fuel disposal. The methodology is the same methodology as was developed to describe the risks from geologic disposal of wastes from reprocessed spent fuel. The difference between spent fuel wastes and wastes from reprocessing that may affect the applicability of the methodology are highlighted

  10. Methods for separating actinides from reprocessing and refabrication plant wastes

    International Nuclear Information System (INIS)

    Tedder, D.W.; Finney, B.C.; Blomeke, J.O.

    1979-01-01

    Chemical processing flowsheets have been developed to partition actinides from all actinide-bearing LWR fuel reprocessing and refabrication plant wastes. These wastes include high-activity-level liquids, scrap recovery liquors, HEPA filters and incinerator ashes, and chemical salt wastes such as sodium carbonate scrub solutions, detergent cleanup streams, and alkaline off-gas scrubber liquors. The separations processes that were adopted for this study are based on solvent extraction, cation exchange chromatography, and leaching with Ce 4+ -HNO 3 solution

  11. Nuclear fuel re-processing plant

    International Nuclear Information System (INIS)

    Sasaki, Yuko; Honda, Takashi; Shoji, Saburo; Kobayashi, Shiro; Furuya, Yasumasa

    1989-01-01

    In a nuclear fuel re-processing plant, high Si series stainless steels not always have sufficient corrosion resistance in a solution containing only nitric acid at medium or high concentration. Further, a method of blowing NOx gases may possibly promote the corrosion of equipment constituent materials remarkably. In view of the above, the corrosion promoting effect of nuclear fission products is suppressed without depositing corrosive metal ions as metals in the nitric acid solution. That is, a reducing atmosphere is formed by generating NOx by electrolytic reduction thereby preventing increase in the surface potential of stainless steels. Further, an anode is disposed in the nitric acid solution containing oxidative metal ions to establish an electrical conduction and separate them by way of partition membranes and a constant potential or constant current is applied while maintaining an ionic state so as not to deposit metals. Thus, equipments of re-processing facility can be protected from corrosion with no particular treatment for wastes as radioactive materials. (K.M.)

  12. Development of some operations in technological flowsheet for spent VVER fuel reprocessing at a pilot plant

    International Nuclear Information System (INIS)

    Lazarev, L.N.; Galkin, B.Ya; Lyubtsev, R.I.; Romanovskii, V.N.; Velikhov, E.P.

    1981-01-01

    The fuel reprocessing pilot plants for high active materials would permit the study and development or particular processing steps and flowsheet variations; in some cases, these experimental installations realize on a small scale practically all technological chains of large reprocessing plants. Such a fuel reprocessing pilot plant with capacity of 3 kg U/d has been built at V. G. Khlopin Radium Institute. The pilot plant is installed in the hot cell of radiochemical compartment, and is composed of the equipments for fuel element cutting and dissolving, the preparation of feed solution (clarification, correction), extraction reprocessing and the production of uranium, plutonium and neptunium concentrates, the complex processing of liquid and solid wastes and a special unit for gas purification and analysis. In the last few years, a series of experiments have been carried out on the reprocessing of spent VVER fuel. (J.P.N.)

  13. Transport and reprocessing of irradiated nuclear fuel

    International Nuclear Information System (INIS)

    Lenail, B.

    1981-01-01

    This contribution deals with transport and packaging of oxide fuel from and to the Cogema reprocessing plant at La Hague (France). After a general discussion of nuclear fuel and the fuel cycle, the main aspects of transport and reprocessing of oxide fuel are analysed. (Auth.)

  14. Preliminary analysis of treatment strategies for transuranic wastes from reprocessing plants

    International Nuclear Information System (INIS)

    Ross, W.A.; Schneider, K.J.; Swanson, J.L.; Yasutake, K.M.; Allen, R.P.

    1985-07-01

    This document provides a comparison of six treatment options for transuranic wastes (TRUW) resulting from the reprocessing of commercial spent fuel. Projected transuranic waste streams from the Barnwell Nuclear Fuel Plant (BNFP), the reference fuel reprocessing plant in this report, were grouped into the five categories of hulls and hardware, failed equipment, filters, fluorinator solids, and general process trash (GPT) and sample and analytical cell (SAC) wastes. Six potential treatment options were selected for the five categories of waste. These options represent six basic treatment objectives: (1) no treatment, (2) minimum treatment (compaction), (3) minimum number of processes and products (cementing or grouting), (4) maximum volume reduction without decontamination (melting, incinerating, hot pressing), (5) maximum volume reduction with decontamination (decontamination, treatment of residues), and (6) noncombustible waste forms (melting, incinerating, cementing). Schemes for treatment of each waste type were selected and developed for each treatment option and each type of waste. From these schemes, transuranic waste volumes were found to vary from 1 m 3 /MTU for no treatment to as low as 0.02 m 3 /MTU. Based on conceptual design requirements, life-cycle costs were estimated for treatment plus on-site storage, transportation, and disposal of both high-level and transuranic wastes (and incremental low-level wastes) from 70,000 MTU. The study concludes that extensive treatment is warranted from both cost and waste form characteristics considerations, and that the characteristics of most of the processing systems used are acceptable. The study recommends that additional combinations of treatment methods or strategies be evaluated and that in the interim, melting, incineration, and cementing be further developed for commercial TRUW. 45 refs., 9 figs., 32 tabs

  15. Preliminary analysis of treatment strategies for transuranic wastes from reprocessing plants

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.A.; Schneider, K.J.; Swanson, J.L.; Yasutake, K.M.; Allen, R.P.

    1985-07-01

    This document provides a comparison of six treatment options for transuranic wastes (TRUW) resulting from the reprocessing of commercial spent fuel. Projected transuranic waste streams from the Barnwell Nuclear Fuel Plant (BNFP), the reference fuel reprocessing plant in this report, were grouped into the five categories of hulls and hardware, failed equipment, filters, fluorinator solids, and general process trash (GPT) and sample and analytical cell (SAC) wastes. Six potential treatment options were selected for the five categories of waste. These options represent six basic treatment objectives: (1) no treatment, (2) minimum treatment (compaction), (3) minimum number of processes and products (cementing or grouting), (4) maximum volume reduction without decontamination (melting, incinerating, hot pressing), (5) maximum volume reduction with decontamination (decontamination, treatment of residues), and (6) noncombustible waste forms (melting, incinerating, cementing). Schemes for treatment of each waste type were selected and developed for each treatment option and each type of waste. From these schemes, transuranic waste volumes were found to vary from 1 m/sup 3//MTU for no treatment to as low as 0.02 m/sup 3//MTU. Based on conceptual design requirements, life-cycle costs were estimated for treatment plus on-site storage, transportation, and disposal of both high-level and transuranic wastes (and incremental low-level wastes) from 70,000 MTU. The study concludes that extensive treatment is warranted from both cost and waste form characteristics considerations, and that the characteristics of most of the processing systems used are acceptable. The study recommends that additional combinations of treatment methods or strategies be evaluated and that in the interim, melting, incineration, and cementing be further developed for commercial TRUW. 45 refs., 9 figs., 32 tabs.

  16. Application of curium measurements for safeguarding at reprocessing plants. Study 1: High-level liquid waste and Study 2: Spent fuel assemblies and leached hulls

    International Nuclear Information System (INIS)

    Rinard, P.M.; Menlove, H.O.

    1996-03-01

    In large-scale reprocessing plants for spent fuel assemblies, the quantity of plutonium in the waste streams each year is large enough to be important for nuclear safeguards. The wastes are drums of leached hulls and cylinders of vitrified high-level liquid waste. The plutonium amounts in these wastes cannot be measured directly by a nondestructive assay (NDA) technique because the gamma rays emitted by plutonium are obscured by gamma rays from fission products, and the neutrons from spontaneous fissions are obscured by those from curium. The most practical NDA signal from the waste is the neutron emission from curium. A diversion of waste for its plutonium would also take a detectable amount of curium, so if the amount of curium in a waste stream is reduced, it can be inferred that there is also a reduced amount of plutonium. This report studies the feasibility of tracking the curium through a reprocessing plant with neutron measurements at key locations: spent fuel assemblies prior to shearing, the accountability tank after dissolution, drums of leached hulls after dissolution, and canisters of vitrified high-level waste after separation. Existing pertinent measurement techniques are reviewed, improvements are suggested, and new measurements are proposed. The authors integrate these curium measurements into a safeguards system

  17. Reprocessing: A reasonable way of waste disposal

    International Nuclear Information System (INIS)

    Merz, E.

    1986-01-01

    Reprocessing is the only way to recover the valuable substances contained in the burnt fuel elements and to make them utilizable for energy generation again. It is easier to adapt a national solution to the special domestic needs than a waste management plant which is operated on an international basis and is therefore simpler to be implemented. It guarantees independence, stands for the meeting of requirements resulting from the Non-Proliferation Treaty and creates safe jobs. Furthermore, it offers more liberty in applying optimized recycling strategies. A national reprocessing industry leads to an improved competitive position in the nuclear business, due to technological development and demonstration. A country like the Federal Republic of Germany, which depends on exports, does need top-level technologies. (HSCH) [de

  18. Revisit of analytical methods for the process and plant control analyses during reprocessing of fast reactor fuels

    International Nuclear Information System (INIS)

    Subba Rao, R.V.

    2016-01-01

    CORAL (COmpact facility for Reprocessing of Advanced fuels in Lead cell) is an experimental facility for demonstrating the reprocessing of irradiated fast reactor fuels discharged from the Fast Breeder Test Reactor (FBTR). The objective of the reprocessing plant is to achieve nuclear grade plutonium and uranium oxides with minimum process waste volumes. The process flow sheet for the reprocessing of spent Fast Reactor Fuel consists of Transport of spent fuel, Chopping, Dissolution, Feed conditioning, Solvent Extraction cycle, Partitioning Cycle and Re-conversion of Plutonium nitrate and uranium nitrate to respective oxides. The efficiency and performance of the plant to achieve desired objective depends on the analyses of various species in the different steps adopted during reprocessing of fuels. The analytical requirements in the plant can be broadly classified as 1. Process control Analyses (Analyses which effect the performance of the plant- PCA); 2. Plant control Analyses (Analyses which indicates efficiency of the plant-PLCA); 3. Nuclear Material Accounting samples (Analyses which has bearing on nuclear material accounting in the plant - NUMAC) and Quality control Analyses (Quality of the input bulk chemicals as well as products - QCA). The analytical methods selected are based on the duration of analyses, precision and accuracies required for each type analytical requirement classified earlier. The process and plant control analyses requires lower precision and accuracies as compared to NUMAC analyses, which requires very high precision accuracy. The time taken for analyses should be as lower as possible for process and plant control analyses as compared to NUMAC analyses. The analytical methods required for determining U and Pu in process and plant samples from FRFR will be different as compared to samples from TRFR (Thermal Reactor Fuel Reprocessing) due to higher Pu to U ratio in FRFR as compared TRFR and they should be such that they can be easily

  19. A survey of methods to immobilize tritium and carbon-14 arising from a nuclear fuel reprocessing plant

    International Nuclear Information System (INIS)

    Taylor, P.

    1991-02-01

    This report reviews the literature on methods to separate and immobilize tritium ( 3 H) and carbon-14 ( 14 C) released from U0 2 fuel in a nuclear fuel reprocessing plant. It was prepared as part of a broader review of fuel reprocessing waste management methods that might find future application in Canada. The calculated inventories of both 3 H and 14 C in used fuel are low; special measures to limit releases of these radionuclides from reprocessing plants are not currently in place, and may not be necessary in future. If required, however, several possible approaches to the concentration and immobilization of both radionuclides are available for development. Technology to control these radionuclides in reactor process streams is in general more highly developed than for reprocessing plant effluent, and some control methods may be adaptable to reprocessing applications

  20. Power Reactor Fuel Reprocessing Plant-2, Tarapur: a benchmark in Indian PHWR spent fuel reprocessing

    International Nuclear Information System (INIS)

    Pradhan, Sanjay; Dubey, K.; Qureshi, F.T.; Lokeswar, S.P.

    2017-01-01

    Power Reactor Fuel Reprocessing Plant-2 (PREFRE-2) is latest operating spent nuclear fuel reprocessing plant in India. This plant has improved design based on latest technology and feedback provided by the earlier plants. The design of PREFRE-2 plant is in five cycles of solvent extraction using TBP as extractant. The plant is commissioned in year 2011 after regulatory clearances

  1. Reprocessing techniques of LWR spent fuel for reutilization in hybrid systems and IV generation reactors

    Energy Technology Data Exchange (ETDEWEB)

    Aruquipa, Wilmer; Velasquez, Carlos E.; Pereira, Claubia; Veloso, Maria Auxiliadora F.; Costa, Antonella L. [Universidade Federal de Minas Gerais (UFMG), Belo Horizonte, MG (Brazil). Departamento de Engenharia Nuclear; Barros, Graiciany de P. [Comissao Nacional de Energia Nuclear (CNEN), Rio de Janeiro, RJ (Brazil)

    2017-07-01

    Since the era of nuclear technology begins, nuclear reactors have been produced spent fuel. This spent fuel contains material that could be recycle and reprocessed by different processes. All these processes aim to reduce the contribution to the final repository through the re-utilization of the nuclear material. Therefore, some new reprocessing options with non-proliferation characteristics have been proposed and the goal is to compare the different techniques used to maximize the effectiveness of the spent fuel utilization and to reduce the volume and long-term radiotoxicity of high-level waste by irradiation with neutron with high energy such as the ones created in hybrid reactors. In order to compare different recovery methods, the cross sections of fuels are calculated with de MCNP code, the first set consists of thorium-232 spiked with the reprocessed material and the second set in depleted uranium that containing 4.5% of U-235 spiked with the reprocessed material; These sets in turn are compared with the cross section of the UO{sub 2} in order to evaluate the efficiency of the reprocessed fuel as nuclear fuel. (author)

  2. Reprocessing in breeder fuel cycles

    International Nuclear Information System (INIS)

    Burch, W.D.; Groenier, W.S.

    1982-01-01

    Over the past decade, the United States has developed plans and carried out programs directed toward the demonstration of breeder fuel reprocessing in connection with the first breeder demonstration reactor. A renewed commitment to moving forward with the construction of the Clinch River Breeder Reactor (CRBR) has been made, with startup anticipated near the end of this decade. While plans for the CRBR and its associated fuel cycle are still being firmed up, the basic research and development programs required to carry out the demonstrations have continued. This paper updates the status of the reprocessing plans and programs. Policies call for breeder recycle to begin in the early to mid-1990's. Contents of this paper are: (1) evolving plans for breeder reprocessing (demonstration reprocessing plant, reprocessing head-end colocated at an existing facility); (2) relationship to LWR reprocessing; (3) integrated equipment test (IET) facility and related hardware development activities (mechanical considerations in shearing and dissolving, remote operations and maintenance demonstration phase of IET, integrated process demonstration phase of IET, separate component development activities); and (4) supporting process R and D

  3. An analysis of development and research on spent nuclear fuel reprocessing

    International Nuclear Information System (INIS)

    Borges Silverio, Leticia; Queiroz Lamas, Wendell de

    2011-01-01

    Nuclear energy comes back to the discussions on the world stage as an energy source that does not contribute to global warming during production process. It can be chosen as the main source of power generation in some countries or complement the energy matrix in others. In this context, there is the need to develop new technologies for the management of radioactive waste generated by the production process. Final repositories for spent fuel are not yet in commercial operation, and techniques for fuel reprocessing have been developed, because after use, the fuel still has materials that produce energy. Some countries already use reprocessing, and develop research to make it more secure and more competitive, while others prefer to adopt policies to prevent developments in this area due to the problem of nuclear proliferation. In another line of research, new reactors are being developed in order to reduce the amount of waste in energy production and some will be designed to work in closed loop, recycling the materials generated.

  4. An analysis of development and research on spent nuclear fuel reprocessing

    Energy Technology Data Exchange (ETDEWEB)

    Borges Silverio, Leticia; Lamas, Wendell de Queiroz [University of Taubate, Postgraduate Programme in Mechanical Engineering, Rua Daniel Danelli, s/n, Jd. Morumbi, Taubate, SP 12060-440 (Brazil)

    2011-01-15

    Nuclear energy comes back to the discussions on the world stage as an energy source that does not contribute to global warming during production process. It can be chosen as the main source of power generation in some countries or complement the energy matrix in others. In this context, there is the need to develop new technologies for the management of radioactive waste generated by the production process. Final repositories for spent fuel are not yet in commercial operation, and techniques for fuel reprocessing have been developed, because after use, the fuel still has materials that produce energy. Some countries already use reprocessing, and develop research to make it more secure and more competitive, while others prefer to adopt policies to prevent developments in this area due to the problem of nuclear proliferation. In another line of research, new reactors are being developed in order to reduce the amount of waste in energy production and some will be designed to work in closed loop, recycling the materials generated. (author)

  5. Reprocessing: experience and future outlooks

    International Nuclear Information System (INIS)

    Rapin, M.

    1981-01-01

    It is shown that reprocessing is the best way to cope with irradiated fuels since it provides an optimized waste conditioning for long term storage, the possibility to recycle fissile material and the reduction of Pu diversion risk. The reprocessing constraints are discussed from political, technical, safety, public acceptance, and economical points of view. The French reprocessing programme (thermal reactor fuel fast breeder fuels) is presented together with a short review of the reprocessing experience and outlooks out of France [fr

  6. Waste management system alternatives for treatment of wastes from spent fuel reprocessing

    International Nuclear Information System (INIS)

    McKee, R.W.; Swanson, J.L.; Daling, P.M.

    1986-09-01

    This study was performed to help identify a preferred TRU waste treatment alternative for reprocessing wastes with respect to waste form performance in a geologic repository, near-term waste management system risks, and minimum waste management system costs. The results were intended for use in developing TRU waste acceptance requirements that may be needed to meet regulatory requirements for disposal of TRU wastes in a geologic repository. The waste management system components included in this analysis are waste treatment and packaging, transportation, and disposal. The major features of the TRU waste treatment alternatives examined here include: (1) packaging (as-produced) without treatment (PWOT); (2) compaction of hulls and other compactable wastes; (3) incineration of combustibles with cementation of the ash plus compaction of hulls and filters; (4) melting of hulls and failed equipment plus incineration of combustibles with vitrification of the ash along with the HLW; (5a) decontamination of hulls and failed equipment to produce LLW plus incineration and incorporation of ash and other inert wastes into HLW glass; and (5b) variation of this fifth treatment alternative in which the incineration ash is incorporated into a separate TRU waste glass. The six alternative processing system concepts provide progressively increasing levels of TRU waste consolidation and TRU waste form integrity. Vitrification of HLW and intermediate-level liquid wastes (ILLW) was assumed in all cases

  7. Nuclear fuel waste disposal

    International Nuclear Information System (INIS)

    1982-01-01

    This film for a general audience deals with nuclear fuel waste management in Canada, where research is concentrating on land based geologic disposal of wastes rather than on reprocessing of fuel. The waste management programme is based on cooperation of the AECL, various universities and Ontario Hydro. Findings of research institutes in other countries are taken into account as well. The long-term effects of buried radioactive wastes on humans (ground water, food chain etc.) are carefully studied with the help of computer models. Animated sequences illustrate the behaviour of radionuclides and explain the idea of a multiple barrier system to minimize the danger of radiation hazards

  8. Reprocessing

    International Nuclear Information System (INIS)

    Couture, J.; Rougeau, J.-P.

    1987-01-01

    The course of development of a comprehensive nuclear power industry has its own pace which implies the timely progressive and consistent mastery of each industrial step. In the nuclear fuel it is not surprising that the back-end services have lastly reached the industrial stage. In France, we have now fully completed the industrial demonstration of the closed fuel cycle. Our experience covers all necessary steps : transportation of spent fuel, storage, reprocessing, waste conditioning, recovered uranium recycling, plutonium recycling in thermal MOX fuels, plutonium-based fuel for FBR. While FBR development is a long term target, recycling of fissile materials in present LWR reactors appears to be a source of noticable savings. In the meantime rational management of waste material is the key for increased safety and better environment protection. Reprocessing activity is certainly the major achievement of the back-end strategy. The proven efficiency of this technique as it is implemented at La Hague facility gives the full assurance of a smooth operation of the under completion UP3 unit. The base-load management system which applies during the first ten years of its operation will make possible a noticable reduction of the commercial price for reprocessing services by the end of the century. Industrial maturity being confirmed, economic maturity is now the outstanding merit of the reprocessing and recycling strategy. It is a permanent challenge, to which the response is definitely positive in the sense of reducing the nuclear KWh production cost. (author)

  9. Alternatives for managing wastes from reactors and post-fission operations in the LWR fuel cycle. Volume 2. Alternatives for waste treatment

    International Nuclear Information System (INIS)

    1976-05-01

    Volume II of the five-volume report is devoted to the description of alternatives for waste treatment. The discussion is presented under the following section titles: fuel reprocessing modifications; high-level liquid waste solidification; treatment and immobilization of chop-leach fuel bundle residues; treatment of noncombustible solid wastes; treatment of combustible wastes; treatment of non-high-level liquid wastes; recovery of transuranics from non-high-level wastes; immobilization of miscellaneous non-high-level wastes; volatile radioisotope recovery and off-gas treatment; immobilization of volatile radioisotopes; retired facilities (decontamination and decommissioning); and, modification and use of selected fuel reprocessing wastes

  10. Alternatives for managing wastes from reactors and post-fission operations in the LWR fuel cycle. Volume 2. Alternatives for waste treatment

    Energy Technology Data Exchange (ETDEWEB)

    1976-05-01

    Volume II of the five-volume report is devoted to the description of alternatives for waste treatment. The discussion is presented under the following section titles: fuel reprocessing modifications; high-level liquid waste solidification; treatment and immobilization of chop-leach fuel bundle residues; treatment of noncombustible solid wastes; treatment of combustible wastes; treatment of non-high-level liquid wastes; recovery of transuranics from non-high-level wastes; immobilization of miscellaneous non-high-level wastes; volatile radioisotope recovery and off-gas treatment; immobilization of volatile radioisotopes; retired facilities (decontamination and decommissioning); and, modification and use of selected fuel reprocessing wastes. (JGB)

  11. Policy in France regarding the back-end of the fuel cycle reprocessing/recycling route

    International Nuclear Information System (INIS)

    Gloaguen, A.; Lenail, B.

    1991-01-01

    The decision taken in early 1970s to base the French power policy on the use of pressurized water reactors also included the strategy for the back end of the nuclear fuel cycle based on reprocessing, waste conditioning for the final disposal in the most suitable form in terms of safety and plutonium recycling to fast breeder reactors. Twenty years have elapsed, and substantial development and investment have been made. New evidences have emerged especially regarding breeder development, and the initial choice has been proved to be sound. EDF and COGEMA, the French utility and fuel cycle companies, respectively, are working together in order to take the best advantage of past efforts. The good behavior of MOX fuel in EDF reactors and the excellent start of the UP3 reprocessing plant of La Hague, which was completed and commissioned in August, 1990, made EDF and COGEMA extremely confident for future decision. The French choice made in favor of fuel reprocessing the history of fuel reprocessing in France, the policy concerning the back end of nuclear fuel cycle of EDF, and the present consideration and circumstances on this matter are reported. (K.I.)

  12. Wastes and waste management in the uranium fuel cycle for light water reactors

    International Nuclear Information System (INIS)

    Costello, J.M.

    1975-08-01

    The manufacturing processes in the uranium fuel cycle for light water reactors have been described with particular reference to the chemical and radiological wastes produced and the waste management procedures employed. The problems and possible solutions of ultimate disposal of high activity fission products and transuranium elements from reprocessing of irradiated fuel have been reviewed. Quantities of wastes arising in each stage of the fuel cycle have been summarised. Wastes arising from reactor operation have been described briefly. (author)

  13. Compilation of papers presented to the KTG conference on 'Advanced LWR fuel elements: Design, performance and reprocessing', 17-18 November 1988, Karlsruhe Nuclear Research Center

    International Nuclear Information System (INIS)

    Bahm, W.

    1989-05-01

    The two expert groups of the Nuclear Society (KTG), 'chemistry and waste disposal' and 'fuel elements' discussed interdisciplinary problems concerning the development and reprocessing of advanced fuel elements. The 10 lectures deal with waste disposal, mechanical layout, operating behaviour, operating experiences and new developments of fuel elements for water moderated reactors as well as operational experiences of the Karlsruhe reprocessing plant (WAK) with reprocessing of high burnup LWR and MOX fuel elements, the distribution of fission products, the condition of the fission products during dissolution and with the effects of the higher burnup of fuel elements on the PUREX process. (DG) [de

  14. Operational experiences in radiation protection in fast reactor fuel reprocessing facility

    International Nuclear Information System (INIS)

    Meenakshisundaram, V.; Rajagopal, V.; Santhanam, R.; Baskar, S.; Madhusoodanan, U.; Chandrasekaran, S.; Balasundar, S.; Suresh, K.; Ajoy, K.C.; Dhanasekaran, A.; Akila, R.; Indira, R.

    2008-01-01

    The Compact Reprocessing facility for Advanced fuels in Lead cells (CORAL), situated at Indira Gandhi Centre for Atomic Research (IGCAR), Kalpakkam is a pilot plant to reprocess the mixed carbide fuel, for the first time in the world. Reprocessing of fuel with varying burn-ups up to 155 G Wd/t, irradiated at Fast Breeder Test Reactor (FBTR), has been successfully carried out at CORAL. Providing radiological surveillance in a fuel reprocessing facility itself is a challenging task, considering the dynamic status of the sources and the proximity of the operator with the radioactive material and it is more so in a fast reactor fuel reprocessing facility due to handling of higher burn-up fuels associated with radiation fields and elevated levels of fissile material content from the point of view of criticality hazard. A very detailed radiation protection program is in place at CORAL. This includes, among others, monitoring the release of 85 Kr and other fission products and actinides, if any, through stack on a continuous basis to comply with the regulatory limits and management of disposal of different types of radioactive wastes. Providing radiological surveillance during the operations such as fuel transport, chopping and dissolution and extraction cycle was without any major difficulty, as these were carried out in well-shielded and high integrity lead cells. Enforcement of exposure control assumes more importance during the analysis of process samples and re-conversion operations due to the presence of fission product impurities and also since the operations were done in glove boxes and fume hoods. Although the radiation fields encountered in process area were marginally higher, due to the enforcement of strict administrative controls, the annual exposure to the radiation workers was well within the regulatory limit. As the facility is being used as test bed for validation of prototype equipment, periodic inspection and maintenance of components such as centrifuge

  15. Nuclear fuel cycle: (5) reprocessing of irradiated fuel

    Energy Technology Data Exchange (ETDEWEB)

    Williams, J.A.

    1977-09-01

    The evolution of the reprocessing of irradiated fuel and the recovery of plutonium from it is traced out, starting by following the Manhatten project up to the present time. A brief description of the plant and processes used for reprocessing is given, while the Purex process, which is used in all plants today, is given special attention. Some of the important safety problems of reprocessing plants are considered, together with the solutions which have been adopted. Some examples of the more important safety aspects are the control of activity, criticality control, and the environmental impact. The related topic of irradiated fuel transport is briefly discussed.

  16. Material streams in the fuel supply to and disposal of waste from nuclear power stations

    International Nuclear Information System (INIS)

    Merz, E.

    1990-01-01

    The nuclear fuel cycle is characterized by specifically small, but complex material streams. The fresh fuel derived from natural uranium is fed into the cycle at the stage of fuel element fabrication, while at the end stage, waste from spent fuel element reprocessing, or non-reprocessible fuel elements, are taken out of the cycle and prepared for ultimate disposal. The alternative methods of waste management, reprocessing or direct ultimate disposal, are an issue of controversial debate with regard to their differences in terms of supply policy, economic and ecological aspects. (orig.) [de

  17. Remote maintenance in nuclear fuel reprocessing

    International Nuclear Information System (INIS)

    Herndon, J.N.

    1985-01-01

    Remote maintenance techniques applied in large-scale nuclear fuel reprocessing plants are reviewed with particular attention to the three major maintenance philosophy groupings: contact, remote crane canyon, and remote/contact. Examples are given, and the relative success of each type is discussed. Probable future directions for large-scale reprocessing plant maintenance are described along with advanced manipulation systems for application in the plants. The remote maintenance development program within the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory is also described. 19 refs., 19 figs

  18. Radioactive waste control at the reprocessing facility in fiscal 1980

    International Nuclear Information System (INIS)

    1982-01-01

    At the fuel reprocessing facility of the Power Reactor and Nuclear Fuel Development Corporation (PNC), the release of radioactive gaseous and liquid wastes are controlled so as not to exceed the specific levels. Concentrated low and high level liquid wastes, sludge, etc. are contained in storage tanks. Low and high level solid wastes are stored in appropriate containers. In fiscal 1980 (April to March), the release of gaseous and liquid wastes was below the specific levels (as in the previous years). Based on the report made by PNC in accordance with the law concerning the regulation of reactors, etc., the following data are presented in tables: the released quantity of radioactive gaseous and liquid wastes in fiscal 1980, the cumulative stored quantity of radioactive liquid wastes up to fiscal 1980; the cumulative stored quantity of radioactive solid wastes up to fiscal 1980 and the quantity of the same stored in fiscal 1980. (J.P.N.)

  19. Reprocessing of nuclear fuels - status report

    International Nuclear Information System (INIS)

    Schueller, W.

    1976-01-01

    The paper gives a survey on reprocessing plants at present under construction, in operation, and planned, as well as on the most important process steps such as receipt, storage, conversion, the extraction process, purification of the end products, gaseous waste treatment and waste treatment, and repair and maintenance of reprocessing plants. An outline on operational experience with WAK follows. (HR/LN) [de

  20. Radiological aspects of postfission waste management for light-water reactor fuel cycle options

    Energy Technology Data Exchange (ETDEWEB)

    Shipler, D B; Nelson, I C [Battelle Pacific Northwest Laboratories, Richland, WA (United States)

    1978-12-01

    A generic environmental impact statement on the management of radioactive postfission wastes from various light-water reactor fuel cycles in the United States has been prepared. The environmental analysis for post-fission waste management includes an examination of radiological impacts related to different waste treatment, storage, transportation, and disposal options at the process level. Effects addressed include effluents from plants, and radiological impacts from facility operation (routine and accidents), and decommissioning. Environmental effects are combined for fuel reprocessing plants, mixed-oxide fuel fabrication plants, and waste repositories. Radiological effects are also aggregated for several fuel cycle options over the period 1980 and 2050. Fuel cycles analyzed are (1) once-through cycle in which spent reactor fuel is cooled in water basins for at least 6-1/2 years and then disposed of in deep geologic repositories; (2) spent fuel reprocessing in which uranium only and uranium and plutonium is recycled and solidified high level waste, fuel residues, and non-high-level transuranic wastes are disposed of in deep geologic repositories; and (3) deferred cycle that calls for storage of spent fuel at Federal spent fuel storage facilities until the year 2000 at which time a decision is made whether to dispose of spent fuel as a waste or to reprocess the fuel to recover uranium and plutonium. Key environmental issues for decision-making related to waste management alternatives and fuel cycle options are highlighted. (author)

  1. Low and medium level liquid waste processing at the new La Hague reprocessing plant

    International Nuclear Information System (INIS)

    Alexandre, D.

    1986-05-01

    Reprocessing of spent nuclear fuels produces low and medium activity liquid wastes. These radioactive wastes are decontamined before release in environment. The new effluent processing plant, which is being built at La Hague, is briefly described. Radionuclides are removed from liquid wastes by coprecipitation. The effluent is released after decantation and filtration. Insoluble sludges are conditioned in bitumen [fr

  2. Nondestructive determination of residual fuel on leached hulls and dissolver sludges from LWR fuel reprocessing

    International Nuclear Information System (INIS)

    Wuerz, H.; Wagner, K.; Becker, H.J.

    1990-01-01

    In reprocessing plants leached hulls and dissolver sludges represent rather important intermediate level α-waste streams. A control of the Pu content of these waste streams is desirable. The nondestructive assay method to be preferred would be passive neutron counting. However, before any decision on passive neutron monitoring becomes possible a characterization of hulls and sludges in terms of Pu content and neutron emission is necessary. For the direct determination of plutonium on hulls and in sludges, as coming from reprocessing, an active neutron measurement is required. A simple, and sufficiently sensitive active neutron method which can easily be installed uses as stationary Cf-252 neutron source. This method was used for the characterization of hulls and sludges in terms of plutonium content and total neutron emission in the WAK. Meanwhile a total of 28 batches of leached hulls and 22 batches of dissolver sludges from reprocessing of PWR fuel have been assayed. The paper describes the assay method used and gives an analysis of the error sources together with a discussion of the results and the accuracies obtained in a reprocessing plant. (orig./HP)

  3. Chemical engineering in fuel reprocessing. The French experience

    International Nuclear Information System (INIS)

    Viala, M.; Sombret, C.; Bernard, C.; Miquel, P.; Moulin, J.P.

    1992-01-01

    Reprocessing is the back-end of the nuclear fuel cycle, designed to recover valuable fissile materials, especially plutonium, and to condition safely all the wastes ready for disposal. For its new commercial reprocessing plants (UP 3 and UP 2 800) COGEMA decided to include many engineering innovations as well as new processes and key-components developed by CEA. UP 3 is a complete new plant with a capacity of 800 t/y which was put in operation in August 1990. UP 2 800 is an extension of the existing UP 2 facility, designed to achieve the same annual capacity of 800 t/y, to be put in operation at the end of 1993 by the commissioning of a new head-end and highly active chemical process facilities

  4. Spent fuel management: reprocessing or storage

    International Nuclear Information System (INIS)

    Lima Soares, M.L. de; Oliveira Lopes, M.J. de

    1986-01-01

    A review of the spent fuel management concepts generally adopted in several countries is presented, including an analysis of the brazilian situation. The alternatives are the reprocessing, the interim storage and the final disposal in a repository after appropriate conditioning. The commercial operating reprocessing facilities in the Western World are located in France and in the United Kingdom. In the USA the anti-reprocessing policy from 1977 changed in 1981, when the government supported the resumption of commercial reprocessing and designated the private sector as responsible for providing these services. Small scale facilities are operating in India, Italy, Japan and West Germany. Pilot plants for LWR fuel are being planned by Spain, Pakistan and Argentina. (Author) [pt

  5. Spent fuel management: reprocessing or storage

    International Nuclear Information System (INIS)

    Lima Soares, M.L. de; Oliveira Lopes, M.J. de.

    1986-01-01

    A review of the spent fuel management concepts generally adopted in several countries is presented, including an analysis of the brazilian situation. The alternatives are the reprocessing, the interim storage and the final disposal in a repository after appropriate conditioning. The commercial operating reprocessing facilities in the Western World are located in France and in the United Kingdom. In the USA the anti-reprocessing policy from 1977 changed in 1981, when the Government supported the resumption of commercial reprocessing and designated the private sector as responsible for providing these services. Small scale facilities are operating in India, Italy, Japan and West Germany. Pilot plant for LWR fuel are being planned by Spain, Pakistan and Argentina. (Author) [pt

  6. The measurement of neptunium in fast reactor fuel reprocessing

    International Nuclear Information System (INIS)

    Mair, M.A.; Savage, D.J.; Kyffin, T.W.

    1986-02-01

    Analytical techniques have been developed to measure neptunium in the feed, waste and product streams of a fast reactor fuel reprocessing plant. The estimated level of one microgram per milligram of plutonium in some solutions presented severe separation and measurement problems. An initial separation stage was essential, and both ion exchange and solvent extraction using thenoyltrifluoroacetone were studied. The redox chemistry of neptunium necessary to achieve good separation is considered. Spectrophotometry measurement of the stable neptunium/arsenazo III complex was selected for the final neptunium determination with additional analysis by radiometric methods. Incomplete recovery of neptunium during the separation stages necessitated yield measurements, using either neptunium-237 as an internal standard or the short lived gamma active neptunium-239 isotope as a tracer. The distribution of neptunium between the waste and product streams is discussed, in relation to the chemistry of neptunium in the reprocessing plant. (author)

  7. Radioactive wastes in nuclear fuel cycle

    International Nuclear Information System (INIS)

    Sakata, Sadahiro; Nagaike, Tadakatsu; Emura, Satoru; Matsumoto, Akira; Morisawa, Shinsuke.

    1978-01-01

    Recent topics concerning radioactive water management and disposal are widely reviewed. As the introduction, various sources of radioactivity including uranium mining, fuel fabrication, reactor operation and fuel reprocessing and their amount of wastes accumulated per 1000 MWe year operation of a LWR are presented together with the typical methods of disposal. The second section discusses the problems associated with uranium fuel fabrication and with nuclear power plants. Typical radioactive nuclides and their sources in PWRs and BWRs are discussed. The third section deals with the problems associated with reprocessing facilities and with mixed oxide fuel fabrication. Solidification of high-level wastes and the methods of the disposal of transuranic nuclides are the main topics in this section. The fourth section discusses the methods and the problems of final disposal. Various methods being proposed or studied for the final disposal of low- and high-level wastes and transuranic wastes are reviewed. The fifth section concerns with the risk analysis of waste disposal. Both deterministic and probabilistic methods are treated. As the example, the assessment of the risk due to floods is explained. The associated event tree and fault three are presented together with the estimated probability of the occurrence of each constituent failure. In the final section, the environmental problems of radioactive wastes are widely reviewed. (Aoki, K.)

  8. Nuclear fuel cycle and waste management in France

    International Nuclear Information System (INIS)

    Sousselier, Yves.

    1981-05-01

    After a short description of the nuclear fuel cycle mining, milling, enrichment and reprocessing, radioactive waste management in France is exposed. The different types of radioactive wastes are examined. Storage, solidification and safe disposal of these wastes are described

  9. Management of low level wastes at Rokkasho reprocessing plant

    International Nuclear Information System (INIS)

    Moriya, N.; Ochi, E.

    2006-01-01

    Full text: At Rokkasho Reprocessing Plant (RRP), after start-up of the commercial operation, radioactive wastes will be generated. Wastes generated from a reprocessing plant generally consist of many kinds of characteristics in view of ''activity level'', ''nuclide composition'', ''chemical properties'', ''physical properties'', and so on. For stable operation of a reprocessing plant, we should t reat , ''condition'' and ''dispose'' these wastes considering these wastes characteristics. To contribute to the nuclear fuel cycle project, it is important to evaluate technologies such as, ''Treatment'', ''Conditioning'' and ''Final Disposal'', not only for technical but also for economical aspects. Considering the final disposal in the future, the basic policy in ''Treatment'' and ''Conditioning'' at RRP is shown below: Recover and reuse chemicals (such as nitric acid and TBP, etc.) in plant; Radioactive waste shall be divided, classified and managed according to activity level, nuclide composition, the radiation level, its physical properties, chemical properties, etc.; Treat them based on ''classification'' management with proper combination; Condition them as intermediate forms in order to keep flexibility in the future disposal method; Original volume of annually generated wastes at RRP is estimated as 5600m3 except highly radioactive vitrified waste, and these wastes shall be treated in the following units, which are now under commisioning, in order to reduce and stabilize wastes. Low-level concentrated liquid waste to be treated with a ''Drying and peptization'' unit; Spent solvent to be treated with a ''Pyrolysis and hydrothermal solidification'' unit; Relatively low-level non-alfa flammable wastes to be treated with a ''Incineration and hydrothermal solidification'' unit; CB/BP (Channel Box and Burnable Poison) to be processed with a ''Cutting'' unit; Other wastes to be kept as their generated state with a ''Intermediate storage''. As a result of these

  10. Development of the scientific concept of the phosphate methods for actinide-containing waste handling (pyrochemical fuel reprocessing)

    International Nuclear Information System (INIS)

    Orlova, A.I.; Orlova, V.A.; Skiba, O.V.; Bychkov, A.V.; Volkov, Yu.F.; Lukinykh, A.N.; Tomilin, S.V.; Lizin, A.A.

    2008-01-01

    Full text of publication follows: The crystallochemical phosphate concept in question is developed successfully in the new pyro-electrochemical reprocessing technology of irradiated fuel in molten chlorides of alkaline elements at one of the leading scientific nuclear centers - Research Institute of Atomic Reactors. Irradiated fuel is dissolved in molten chlorides of alkaline elements by mean of treating by chlorine. Then uranium and plutonium dioxides are removed electrochemically. The melt, when used many times, is contaminated by the residual actinide and contains fission products and the so called 'process' elements. This melt is unacceptable for future use. Phosphate methods can be applied for the solution of the following tasks: a) reprocessing (purification) of molten chloride salt solvents; b) conversion of the spent chloride melts to the insoluble stable crystalline product for safe storage and disposal. Within the framework of task 'a' phosphate methods may be realized by the several ways: 1) phosphate concentrating of impurities and their extraction from molten chlorides into solid phase by mean of chemical precipitation, co-precipitation, ion exchange and other chemical interactions, 2) conversion of precipitated waste phosphates to stable crystalline phosphate powders or ceramics for safe storage and disposal. (authors)

  11. History and current status of nuclear fuel reprocessing technology

    International Nuclear Information System (INIS)

    Funasaka, Hideyuki; Nagai, Toshihisa; Washiya, Tadahiro

    2008-01-01

    History and present state of fast breeder reactor was reviewed in series. As a history and current status of nuclear fuel reprocessing technology, this ninth lecture presented the progress of the FBR fuel reprocessing technology and advanced reprocessing processes. FBR fuel reprocessing technology had been developed to construct the reprocessing equipment test facilities (RETF) based on PUREX process technologies. With economics, reduction of environmental burdens and proliferation resistance taken into consideration, advanced aqueous method for nuclear fuel cycle activities has been promoted as the government's basic policy. Innovative technologies on mechanical disassembly, continuous rotary dissolver, crystallizer, solvent extraction and actinides recovery have been mainly studied. (T. Tanaka)

  12. Decommissioning alternatives for the West Valley, New York, Fuel Reprocessing Plant

    Energy Technology Data Exchange (ETDEWEB)

    Munson, L F; Nemec, J F; Koochi, A K

    1978-06-01

    The methodology and numerical values of NUREG-0278 were applied to four decommissioning alternatives for the West Valley Fuel Reprocessing Plant. The cost and impacts of the following four alternatives for the process building, fuel receiving and storage, waste tank farm, and auxiliary facilities were assessed: (1) layaway, (2) protective storage, (3) preparation for alternate nuclear use, and (4) dismantlement. The estimated costs are 5.7, 11, 19, and 31 million dollars, respectively. (DLC)

  13. Decommissioning alternatives for the West Valley, New York, Fuel Reprocessing Plant

    International Nuclear Information System (INIS)

    Munson, L.F.; Nemec, J.F.; Koochi, A.K.

    1978-06-01

    The methodology and numerical values of NUREG-0278 were applied to four decommissioning alternatives for the West Valley Fuel Reprocessing Plant. The cost and impacts of the following four alternatives for the process building, fuel receiving and storage, waste tank farm, and auxiliary facilities were assessed: (1) layaway, (2) protective storage, (3) preparation for alternate nuclear use, and (4) dismantlement. The estimated costs are 5.7, 11, 19, and 31 million dollars, respectively

  14. Estimates of relative areas for the disposal in bedded salt of LWR wastes from alternative fuel cycles

    International Nuclear Information System (INIS)

    Lincoln, R.C.; Larson, D.W.; Sisson, C.E.

    1978-01-01

    The relative mine-level areas (land use requirements) which would be required for the disposal of light-water reactor (LWR) radioactive wastes in a hypothetical bedded-salt formation have been estimated. Five waste types from alternative fuel cycles have been considered. The relative thermal response of each of five different site conditions to each waste type has been determined. The fuel cycles considered are the once-through (no recycle), the uranium-only recycle, and the uranium and plutonium recycle. The waste types which were considered include (1) unreprocessed spent reactor fuel, (2) solidified waste derived from reprocessing uranium oxide fuel, (3) plutonium recovered from reprocessing spent reactor fuel and doped with 1.5% of the accompanying waste from reprocessing uranium oxide fuel, (4) waste derived from reprocessing mixed uranium/plutonium oxide fuel in the third recycle, and (5) unreprocessed spent fuel after three recycles of mixed uranium/plutonium oxide fuels. The relative waste-disposal areas were determined from a calculated value of maximum thermal energy (MTE) content of the geologic formations. Results are presented for each geologic site condition in terms of area ratios. Disposal area requirements for each waste type are expressed as ratios relative to the smallest area requirement (for waste type No. 2 above). For the reference geologic site condition, the estimated mine-level disposal area ratios are 4.9 for waste type No. 1, 4.3 for No. 3, 2.6 for No. 4, and 11 for No. 5

  15. Correlation of radioactive waste treatment costs and the environmental impact of waste effluents in the nuclear fuel cycle: reprocessing light-water reactor fuel

    International Nuclear Information System (INIS)

    Finney, B.C.; Blanco, R.E.; Dahlman, R.C.; Hill, G.S.; Kitts, F.G.; Moore, R.E.; Witherspoon, J.P.

    1976-10-01

    A cost/benefit study was made to determine the cost and effectiveness of radioactive waste (radwaste) treatment systems for decreasing the release of radioactive materials from a model nuclear fuel reprocessing plant which processes light-water reactor (LWR) fuels, and to determine the radiological impact (dose commitment) of the released materials on the environment. The study is designed to assist in defining the term as low as reasonably achievable in relation to limiting the release of radioactive materials from nuclear facilities. The base case model plant is representative of current plant technology and has an annual capacity of 1500 metric tons of LWR fuel. Additional radwaste treatment systems are added to the base case plant in a series of case studies to decrease the amounts of radioactive materials released and to reduce the radiological dose commitment to the population in the surrounding area. The cost for the added waste treatment operations and the corresponding dose commitments are calculated for each case. In the final analysis, radiological dose is plotted vs the annual cost for treatment of the radwastes. The status of the radwaste treatment methods used in the case studies is discussed. Much of the technology used in the advanced cases is in an early stage of development and is not suitable for immediate use. The methodology used in estimating the costs, and the radiological doses, detailed calculations, and tabulations are presented in Appendix A and ORNL-4992. This report is a revision of the original study

  16. A novel waste form for disposal of spent-nuclear-fuel reprocessing waste: A vitrifiable cement

    International Nuclear Information System (INIS)

    Gougar, M.L.D.; Scheetz, B.E.; Siemer, D.D.

    1999-01-01

    A cement capable of being hot isostatically pressed into a glass ceramic has been proposed as the waste form for spent-nuclear-fuel reprocessing wastes at the Idaho National Engineering and Environmental Laboratory (INEEL). This intermediate cement, with a composition based on that of common glasses, has been designed and tested. The cement formulations included mixed INEEL wastes, blast furnace slag, reactive silica, and INEEL soil or vermiculite, which were activated with potassium or sodium hydroxide. Following autoclave processing, the cements were characterized. X-ray diffraction analysis revealed three notable crystalline phases: quartz, calcite, and fluorite. Results of compressive strength testing ranged from 1452 and 4163 psi, exceeding the US Nuclear Regulatory Commission (NRC)-suggested standard of >500 psi. From American National Standards Institute/American Nuclear Society 16.1-1986 leach testing, effective diffusivities for Cs were determined to be on the order of 10 -11 to 10 -10 cm 2 /s and for Sr were 10 -12 cm 2 /s, which are four orders of magnitude less than diffusivities in some other radwaste materials. Average leach indices (LI) were 9.6 and 11.9 for Cs and Sr, respectively, meeting the NRC Standard of LI > 6. The 28-day Materials Characterization Center-1 leach testing resulted in normalized elemental mass losses between 0.63 and 28 g/(m 2 ·day) for Cs and between 0.34 and 0.70 g/(m 2 ·day) industry-accepted standard while Cs losses indicate a process sensitive parameter

  17. A review and discussion of candidate ceramics for immobilization of high-level fuel reprocessing wastes

    International Nuclear Information System (INIS)

    Hayward, P.J.

    1982-08-01

    This review discusses and attempts to evaluate 11 of the leading ceramic processes for hosting the high-level and high-level plus medium-level wastes which would arise from the reprocessing of used UO 2 , (Th,Pu)O 2 and (Th,U)O 2 fuels. The wasteform materials considered include glass ceramics, supercalcine ceramics, SYNROC ceramics, 'stuffed glass', titanate ceramics, cermets, clay ceramics, cement-based materials and multibarrier wasteforms. Although no attempt has been made to rank these candidates in order of superiority, the conclusion is drawn that, of the materials proposed so far, a glass ceramic appears to be best suited to the Canadian program, taking into account durability in the potential environment of a flooded vault, ability to withstand radiation and transmutation damage without serious loss of durability, ability to accommodate variable waste compositions, and ease of processing and quality control. This conclusion does not necessarily apply to other national waste management programs. However, many of the points raised might be included in any critical assessment of alternative wasteform materials

  18. Advanced hybrid process with solvent extraction and pyro-chemical process of spent fuel reprocessing for LWR to FBR

    International Nuclear Information System (INIS)

    Fujita, Reiko; Mizuguchi, Koji; Fuse, Kouki; Saso, Michitaka; Utsunomiya, Kazuhiro; Arie, Kazuo

    2008-01-01

    Toshiba has been proposing a new fuel cycle concept of a transition from LWR to FBR. The new fuel cycle concept has better economical process of the LWR spent fuel reprocessing than the present Purex Process and the proliferation resistance for FBR cycle of plutonium with minor actinides after 2040. Toshiba has been developing a new Advanced Hybrid Process with Solvent Extraction and Pyrochemical process of spent fuel reprocessing for LWR to FBR. The Advanced Hybrid Process combines the solvent extraction process of the LWR spent fuel in nitric acid with the recovery of high pure uranium for LWR fuel and the pyro-chemical process in molten salts of impure plutonium recovery with minor actinides for metallic FBR fuel, which is the FBR spent fuel recycle system after FBR age based on the electrorefining process in molten salts since 1988. The new Advanced Hybrid Process enables the decrease of the high-level waste and the secondary waste from the spent fuel reprocessing plants. The R and D costs in the new Advanced Hybrid Process might be reduced because of the mutual Pyro-chemical process in molten salts. This paper describes the new fuel cycle concept of a transition from LWR to FBR and the feasibility of the new Advanced Hybrid Process by fundamental experiments. (author)

  19. Wastes from the light water reactor fuel cycle

    International Nuclear Information System (INIS)

    Steindler, M.J.; Trevorrow, L.E.

    1976-01-01

    The LWR fuel cycle is represented, in the minimum detail necessary to indicate the origin of the wastes, as a system of operations that is typical of those proposed for various commercial fuel cycle ventures. The primary wastes (before any treatment) are described in terms of form, volume, radioactivity, chemical composition, weight, and combustibility (in anticipation of volume reduction treatments). Properties of the wastes expected from the operation of reactors, fuel reprocessing plants, and mixed oxide fuel fabrication plants are expressed in terms of their amounts per unit of nuclear energy produced

  20. Papers presented at the 7th status report of the Reprocessing and Waste Treatment Project

    International Nuclear Information System (INIS)

    1988-10-01

    The report contains all lectures on the present state of the R+D work which were delivered on the occasion of the 7th seminar on the present state of the Reprocessing and Waste Treatment Project in the Karlsruhe Nuclear Research Centre on 15/16 March 1988. The project is aimed at improving methods for nuclear waste disposal with regard to the German reprocessing plant for light-water reactor fuels currently under construction in Wackersdorf. The individual contributions were separately adapted for the INIS and EDB data banks. (RB) [de

  1. Statement on the Consolidated Fuel Reprocessing Program

    International Nuclear Information System (INIS)

    Trauger, D.B.

    1984-01-01

    Oak Ridge National Laboratory has chosen the following objectives for future reprocessing plant design: reduced radiation exposure to workers; minimal environmental impact; improved plant operation and maintenance; improved accountability; no plutonium diversion; and reduced overall capital and operating cost. These objectives lead to a plant with totally remote operation. The Breeder Reactor Engineering Test (BRET) has been designed to perform a key role in demonstrating advanced reprocessing technology. It has been scheduled to be available to reprocess spent fuel from the Fast Flux Test Facility. The principal features of the Consolidated Fuel Reprocessing Program and of the BRET facility are appropriate for all reactor types

  2. Radiation and environmental safety of spent nuclear fuel management options based on direct disposal or reprocessing and disposal of high-level radioactive waste

    International Nuclear Information System (INIS)

    Vuori, S.

    1996-05-01

    The report considers the various stages of two nuclear fuel cycle options: direct disposal and reprocessing followed by disposal of vitrified high-level waste. The comparative review is based on the results of previous international studies and concentrates on the radiation and environmental safety aspects of technical solutions based on today's technology. (23 refs., 7 figs., 4 tabs.)

  3. Proceedings of the 4th status report of the Reprocessing and Waste Management Project (PWA) of November 5th, 1981

    International Nuclear Information System (INIS)

    1982-03-01

    The lectures presented to this meeting deal with the concept of waste disposal in the Federal Republic of Germany, the current state and results of the development work within the project 'Reprocessing and Waste Management'. The main efforts and technological programmes are described as well. Further lectures have been held on problems relating to a fuel reprocessing plant (dissolver-off-gas treatment, tritium separation, hydraulic studies on pulsating columns, electroreduction in the PUREX process, analytical procedures for process analyses). Moreover, materials problems have been discussed and the monitor development for criticality control, work for improving remote handling devices, and the reprocessing of a KNK II reactor mixed oxide fuel in the laboratory test plant MILLI. (RB) [de

  4. Management of regenerant effluent waste at reprocessing plant, Tarapur- a new approach

    Energy Technology Data Exchange (ETDEWEB)

    Chandra, Munish; Bajpai, D D; Mudaiya, Avinash; Varadarajan, N [Power Reactor Fuel Reprocessing Plant, Tarapur (India)

    1994-06-01

    Power Reactor Fuel Reprocessing (PREFRE) Plant, Tarapur has been processing zircaloy clad spent fuel arising from PHWR namely RAPS and MAPS. The plant has been provided with a water pool to receive and store the irradiated fuel assemblies from the reactor site for an interim period before they are taken up for chop-leach and further reprocessing by PUREX process. This paper highlights the important and innovative modifications like introduction of a cation exchanger for water polishing and using nitric acid as regenerant. The regenerant effluent (nitric acid) is recycled to the main process cells where it is mixed and further treated along with process waste stream. This is a step towards minimising effluent generation. The paper describes the advantages of modified system like operational simplification, manpower, man-rem saving and minimising release of activity to environment. 3 figs., 4 tabs.

  5. 1. round table - Spent fuels composition. Back-end of the fuel cycle and reprocessing, plutonium and other nuclear materials management. 2. round table - Separation-transmutation. 3. round table - Scenarios for a long term inventory of nuclear materials and wastes

    International Nuclear Information System (INIS)

    2005-01-01

    The law from December 30, 1991, precisely defines 3 axes of researches for the management of high level and long-lived radioactive wastes: separation/transmutation, surface storage and underground disposal. A global evaluation report about these researches is to be supplied in 2006 by the French government to the Parliament. A first synthesis of the knowledge gained after 14 years of research has led the national commission of the public debate (CNDP) to organize a national debate about the general options of management of high-level and long-lived radioactive wastes before the 2006 date line. The debate comprises 4 public hearings (September 2005: Bar-le-Duc, Saint-Dizier, Pont-du-Gard, Cherbourg), 12 round-tables (October and November 2005: Paris, Joinville, Caen, Nancy, Marseille), a synthesis meeting (December 2005, Dunkerque) and a closing meeting (January 2006, Lyon). This document is the synthesis of the round table debates which took place at Paris on the reprocessing of spent fuels. Three aspects are discussed: the risks linked with the recovery of valorizable materials, the economical viability of the separation/transmutation option, and the future of the nuclear option in the French energy policy. Six presentations (transparencies) are attached with these proceedings which treat of: the reprocessing/recycling to the test, perspectives of future wastes, present day wastes/valorizable materials and future scenarios, critical analysis scenarios, why reprocessing spent fuels?, processing of spent fuels and recycling, separation and transmutation of long-lived radioactive wastes, thorium-uranium cycle. (J.S.)

  6. Incineration of dry burnable waste from reprocessing plants with the Juelich incineration process

    International Nuclear Information System (INIS)

    Dietrich, H.; Gomoll, H.; Lins, H.

    1987-01-01

    The Juelich incineration process is a two stage controlled air incineration process which has been developed for efficient volume reduction of dry burnable waste of various kinds arising at nuclear facilities. It has also been applied to non nuclear industrial and hospital waste incineration and has recently been selected for the new German Fuel Reprocessing Plant under construction in Wackersdorf, Bavaria, in a modified design

  7. Experience and projects concerning treatment, conditioning and storage of all radioactive wastes from Tokai reprocessing plant

    International Nuclear Information System (INIS)

    Fukuda, G.; Matsumoto, K.; Miyahara, K.

    1984-01-01

    The active operation of Tokai reprocessing plant started in September 1977, and about 170 t U of spent fuel were reprocessed between then and December 1982. During this period, the low-level waste processing plant reduced the amount of radioactivity discharged into the environment. For radioactive liquid waste, the treatment procedures consist mainly of evaporation to keep the discharge into the sea at a low level. For combustible low-level solid waste and the solvent waste, which is of low tributyl phosphate content, incineration has been used successfully (burned: about 150 t of combined LLSW, about 50 m 3 of solvent waste, i.e. diluent waste). Most of the past R and D work was devoted to reducing the activity discharged into the environment. Current R and D work is concerned with the treatment of solvent waste, the conditioning of solid wastes, the bituminization of low-level liquid waste and the vitrification of high-level liquid waste. The paper describes present practices, R and D work and future aspects of the treatment, conditioning and storage of all radioactive wastes from Tokai reprocessing plant. (author)

  8. Equipment specifications for an electrochemical fuel reprocessing plant

    International Nuclear Information System (INIS)

    Hemphill, Kevin P.

    2010-01-01

    Electrochemical reprocessing is a technique used to chemically separate and dissolve the components of spent nuclear fuel, in order to produce new metal fuel. There are several different variations to electrochemical reprocessing. These variations are accounted for by both the production of different types of spent nuclear fuel, as well as different states and organizations doing research in the field. For this electrochemical reprocessing plant, the spent fuel will be in the metallurgical form, a product of fast breeder reactors, which are used in many nuclear power plants. The equipment line for this process is divided into two main categories, the fuel refining equipment and the fuel fabrication equipment. The fuel refining equipment is responsible for separating out the plutonium and uranium together, while getting rid of the minor transuranic elements and fission products. The fuel fabrication equipment will then convert this plutonium and uranium mixture into readily usable metal fuel.

  9. Review of thorium fuel reprocessing experience

    International Nuclear Information System (INIS)

    Brooksbank, R.E.; McDuffee, W.T.; Rainey, R.H.

    1978-01-01

    The review reveals that experience in the reprocessing of irradiated thorium materials is limited. Plants that have processed thorium-based fuels were not optimized for the operations. Previous demonstrations of several viable flowsheets provide a sound technological base for the development of optimum reprocessing methods and facilities. In addition to the resource benefit by using thorium, recent nonproliferation thrusts have rejuvenated an interest in thorium reprocessing. Extensive radiation is generated as the result of 232 U-contamination produced in the 233 U, resulting in the remote operation and fabrication operations and increased fuel cycle costs. Development of the denatured thorium flowsheet, which is currently of interest because of nonproliferation concerns, represents a difficult technological challenge

  10. Idaho Nuclear Technology and Engineering Center (INTEC) Sodium Bearing Waste - Waste Incidental to Reprocessing Determination

    International Nuclear Information System (INIS)

    Jacobson, Victor Levon

    2002-01-01

    U.S. Department of Energy Manual 435.1-1, Radioactive Waste Management, Section I.1.C, requires that all radioactive waste subject to Department of Energy Order 435.1 be managed as high-level radioactive waste, transuranic waste, or low-level radioactive waste. Determining the radiological classification of the sodium-bearing waste currently in the Idaho Nuclear Technology and Engineering Center Tank Farm Facility inventory is important to its proper treatment and disposition. This report presents the technical basis for making the determination that the sodium-bearing waste is waste incidental to spent fuel reprocessing and should be managed as mixed transuranic waste. This report focuses on the radiological characteristics of the sodium-bearing waste. The report does not address characterization of the nonradiological, hazardous constituents of the waste in accordance with Resource Conservation and Recovery Act requirements

  11. NO/sub x/ emissions from Hanford nuclear fuels reprocessing plants

    International Nuclear Information System (INIS)

    Pajunen, A.L.; Dirkes, R.L.

    1978-01-01

    Operation of the existing Hanford nuclear fuel reprocessing facilities will increase the release of nitrogen oxides (NO/sub x/) to the atmosphere over present emission rates. Stack emissions from two reprocessing facilities, one waste storage facility and two coal burning power plants will contain increased concentrations of NO/sub x/. The opacity of the reprocessing facilities' emissions is predicted to periodically exceed the State and local opacity limit of twenty percent. Past measurements failed to detect differences in the ambient air NO/sub x/ concentration with and without reprocessing plant operations. Since the facilities are not presently operating, increases in the non-occupational ambient air NO/sub x/ concentration were predicted from theoretical diffusion models. Based on the calculations, the annual average ambient air NO/sub x/ concentration will increase from the present level of less than 0.004 ppM to less than 0.006 ppM at the Hanford site boundaries. The national standard for the annual mean ambient air NO 2 concentration is 0.05 ppM. Therefore, the non-occupational ambient air NO/sub x/ concentration will not be increased to significant levels by reprocessing operations in the Hanford 200 Areas

  12. Fuel reprocessing experience in India: Technological and economic considerations

    International Nuclear Information System (INIS)

    Prasad, A.N.; Kumar, S.V.

    1983-01-01

    The approach to the reprocessing of irradiated fuel from power reactors in India is conditioned by the non-availability of highly enriched uranium with the consequent need for plutonium for the fast-reactor programme. With this in view, the fuel reprocessing programme in India is developing in stages matching the nuclear power programme. The first plant was set up in Trombay to reprocess the metallic uranium fuel from the research reactor CIRUS. The experience gained in the construction and operation of this plant, and in its subsequent decommissioning and reconstruction, has not only provided the know-how for the design of subsequent plants but has indicated the fruitful areas of research and development for efficient utilization of limited resources. The Trombay plant also handled successfully, on a pilot scale, the reprocessing of irradiated thorium fuel to separate uranium-233. The second plant at Tarapur has been built for reprocessing spent fuels from the power reactors at Tarapur (BWR) and Rajasthan (PHWR). The third plant, at present under design, will reprocess the spent fuels from the power reactors (PHWR) and the Fast Breeder Test Reactor (FBTR) located at Kalpakkam. Through the above approach experience has been acquired which will be useful in the design and construction of even larger plants which will become necessary in the future as the nuclear power programme grows. The strategies considered for the sizing and siting of reprocessing plants extend from the idea of small plants, located at nuclear power station sites, to a large-size central plant, located at an independent site, serving many stations. The paper discusses briefly the experience in reprocessing uranium and thorium fuels and also in decommissioning. An attempt is made to outline the technological and economic aspects which are relevant under different circumstances and which influence the size and siting of the fuel reprocessing plants and the expected lead times for construction

  13. Legal questions concerning the termination of spent fuel element reprocessing

    International Nuclear Information System (INIS)

    John, Michele

    2005-01-01

    The thesis on legal aspects of the terminated spent fuel reprocessing in Germany is based on the legislation, jurisdiction and literature until January 2004. The five chapters cover the following topics: description of the problem; reprocessing of spent fuel elements in foreign countries - practical and legal aspects; operators' responsibilities according to the atomic law with respect to the reprocessing of Geman spent fuel elements in foreign countries; compatibility of the prohibition of Geman spent fuel element reprocessing in foreign countries with international law, European law and German constitutional law; results of the evaluation

  14. Reprocessing flowsheet and material balance for MEU spent fuel

    International Nuclear Information System (INIS)

    Abraham, L.

    1978-10-01

    In response to nonproliferation concerns, the high-temperature gas-cooled reactor (HTGR) Fuel Recycle Development Program is investigating the processing requirements for a denatured medium-enriched uranium--thorium (MEU/Th) fuel cycle. Prior work emphasized the processing requirements for a high-enriched uranium--thorium (HEU/Th) fuel cycle. This report presents reprocessing flowsheets for an HTGR/MEU fuel recycle base case. Material balance data have been calculated for reprocessing of spent MEU and recycle fuels in the HTGR Recycle Reference Facility (HRRF). Flowsheet and mass flow effects in MEU-cycle reprocessing are discussed in comparison with prior HEU-cycle flowsheets

  15. UO2-7%Gd2O3 fuel process development by mechanical blending with reprocessing of waste products and usage of densification additive

    International Nuclear Information System (INIS)

    Santos, Lauro Roberto dos

    2009-01-01

    In the nuclear fuel cycle, reprocessing and storage of 'burned' fuels, either temporary or permanent, demand high investments and, in addition, can potentially generate environmental problems. A strategy to decrease these problems is to adopt measures to reduce the amount of waste generated. The usage of integrated burnable poison based on gadolinium is a measure that contributes to achieve this goal. The reason to use burnable poison is to control the neutron population in the reactor during the early life of the fresh reactor core or the beginning of each recharging fuel cycle, extending its cycle duration. Another advantage of using burnable poison is to be able to operate the reactor with higher burning rate, optimizing the usage of the fuel. The process of manufacturing UO 2 -Gd 2 O 3 integrated burnable fuel poison generates waste that, as much as possible, needs to be recycled. Blending of Gd 2 O 3 in UO 2 powder requires the usage of a special additive to achieve the final fuel pellet specified density. The objective of this work is to develop the process of obtaining UO 2 - 7% Gd 2 O 3 integrated burnable poison using densification additives, aluminum hydroxide (Al(OH)3), and reprocessing manufacturing waste products by mechanical blending. The content of 7%- Gd 2 O 3 is based on commercial PWR reactor fuels - Type Angra 2. The results show that the usage of Al(OH) 3 as an additive is a very effective choice that promotes the densification of fuel pellets with recycle up to 10%. Concentrations of 0,20 % of Al(OH) 3 were found to be the indicated amount on an 7 industrial scale, specially when the recycled products come from U 3 O 8 obtained by calcination of sintered pellets. This is particularly interesting because it is following the steps of sintering and rectifying of the pellets, which is generating the largest amounts of recycled material. (author)

  16. UO2-7%Gd2O3 fuel process development by mechanical blending with reprocessing of waste products and usage of densification additive

    International Nuclear Information System (INIS)

    Santos, Lauro Roberto dos

    2009-01-01

    In the nuclear fuel cycle, reprocessing and storage of 'burned' fuels, either temporary or permanent, demand high investments and, in addition, can potentially generate environmental problems. A strategy to decrease these problems is to adopt measures to reduce the amount of waste generated. The usage of integrated burnable poison based on gadolinium is a measure that contributes to achieve this goal. The reason to use burnable poison is to control the neutron population in the reactor during the early life of the fresh reactor core or the beginning of each recharging fuel cycle, extending its cycle duration. Another advantage of using burnable poison is to be able to operate the reactor with higher burning rate, optimizing the usage of the fuel. The process of manufacturing UO 2 -Gd 2 O 3 integrated burnable fuel poison generates waste that, as much as possible, needs to be recycled. Blending of Gd 2 O 3 in UO 2 powder requires the usage of a special additive to achieve the final fuel pellet specified density. The objective of this work is to develop the process of obtaining UO 2 - 7% Gd 2 O 3 integrated burnable poison using densification additives, aluminum hydroxide (Al(OH) 3 ), and reprocessing manufacturing waste products by mechanical blending. The content of 7%- Gd 2 O 3 is based on commercial PWR reactor fuels - Type Angra 2. The results show that the usage of Al(OH) 3 as an additive is a very effective choice that promotes the densification of fuel pellets with recycle up to 10%. Concentrations of 0,20 % of Al(OH) 3 were found to be the indicated amount on an industrial scale, specially when the recycled products come from U 3 O 8 obtained by calcination of sintered pellets. This is particularly interesting because it is following the steps of sintering and rectifying of the pellets, which is generating the largest amounts of recycled material. (author)

  17. Conversion of fuel hulls to zirconate ion exchangers for stabilization of wastes from the thorium fuel cycle

    International Nuclear Information System (INIS)

    Levine, H.S.

    1978-01-01

    A conceptual reprocessing and waste management scheme for Zircaloy clad ThO 2 fuel was formulated to eliminate problems associated with concurrent dissolution of fuel and cladding in the conventional chop-leach headend step. These problems are avoided by use of a modified headend step to form oxide fuel and cladding process streams. A chlorinating agent then converts the cladding hulls and adhering fuel into volatile and nonvolatile chloride fractions. The former product is processed, by use of the Zircaloy conversion process, to form an inorganic ion exchange material and combined with HLLW from subsequent fuel reprocessing to form a stable and refractory waste form. The nonvolatile chloride fraction would be recovered, processed to remove chloride ions, and recombined with the main oxide fuel process stream for further treatment by use of the Thorex process

  18. Consolidated fuel reprocessing program

    International Nuclear Information System (INIS)

    Kuban, D.P.; Noakes, M.W.; Bradley, E.C.

    1987-01-01

    The Advanced Servomanipulator (ASM) System consists of three major components: the ASM slave, the dual arm master controller or master, and the control system. The ASM is a remotely maintainable force-reflecting servomanipulator developed at the Oak Ridge National Laboratory (ORNL) as part of the Consolidated Fuel Reprocessing Program of (CFRP). This new manipulator addresses requirements of advanced nuclear fuel reprocessing with emphasis on force reflection, remote maintainability, and reliability. It uses an all-gear force transmission system. The master arms were designed as a kinematic replica of ASM and use cable force transmission. Special digital control algorithms were developed to improve the system performance. The system is presently operational and undergoing evaluation. Preliminary testing has been completed and is reported. The system is now undergoing commercialization by transferring the technology to the private sector

  19. Capability of minor nuclide confinement in fuel reprocessing

    International Nuclear Information System (INIS)

    Fujine, Sachio; Uchiyama, Gunzo; Mineo, Hideaki; Kihara, Takehiro; Asakura, Toshihide

    1999-01-01

    Experiment with spent fuels has started with the small scale reprocessing facility in NUCEF-BECKY αγ cell. Primary purpose of the experiment is to study the capability of long-lived nuclide confinement both in the PUREX flow sheet applied to the large scale reprocessing plant and also in the PARC (Partitioning Conundrum key process) flow sheet which is our proposal as a simplified reprocessing of one cycle extraction system. Our interests in the experiment are the behaviors of minor long-lived nuclides and the behaviors of the heterogeneous substances, such as sedimentation in the dissolver, organic cruds in the extraction banks. The significance of those behaviors will be assessed from the standpoint of the process safety of reprocessing for high burn-up fuels and MOX fuels. (author)

  20. THORP and the economics of reprocessing

    International Nuclear Information System (INIS)

    Berkhout, F.; Walker, W.

    1990-11-01

    This Report compares the costs of reprocessing spent fuels at the new THORP reprocessing plant at Sellafield with the alternative of storing them prior to final disposal. It finds that even when the cost of constructing THORP is treated as a sunk cost, reprocessing has no decisive economic advantage over spent fuel storage. Electric utilities in Western Europe and Japan have already largely paid for the construction of the new British and French reprocessing plants. Today, their economic judgements therefore depend on the future costs of operating and eventually decommissioning the plants, and of dealing with the resulting wastes and separated products. The costs attached to reprocessing have risen mainly due to the higher estimated costs of waste management and decommissioning, and to the costs of coping with unwanted plutonium. Most of these costs are passed directly on to utilities and thus electricity consumers under the terms of cost-plus contracts. Using cost estimates favourable to the reprocessing option, the total future undiscounted liabilities arising from the first ten years of THORP reprocessing come to Pound 2.4-3.7 billion at today's prices. This compares with the more predictable although still burdensome fuel storage, conditioning and disposal costs of Pound 3.0-3.8 billion. If disposal is not anticipated, the economic advantage shifts decisively in favour of spent fuel storage: Pound 0.9-1.3 billion against Pound 1.4-2.4 billion for reprocessing. (author)

  1. Advances in reprocessing

    International Nuclear Information System (INIS)

    Giraud, J.P.; Guais, J.C.

    1993-01-01

    In a comprehensive nuclear energy program based on Light Water Reactor, closing the nuclear fuel cycle by reprocessing the spent fuel and recycling the recovered fissile materials is a key activity which is now fully mastered at the industrial level. In France a large, modern commercial reprocessing plant called UP3 is operating at La Hague since 18 months in excellent conditions regarding products quality, plant availability, safety and waste management. At the same time, industrial capacities for plutonium recycling by MOX fuel fabrication are under operation and larger units are in construction in France and in Europe. Our customers, the utilities which are engaged in a complete closed fuel cycle in Japan, in Germany, Switzerland, Belgium, the Netherlands, and in France, are having a comprehensive industrial system available for their spent fuel management. Three main objectives are being met by this system: (1) saving natural resources by recycling energetic material: plutonium and uranium; (2) solving the waste management question by a segregating the waste according to their characteristics for a proper conditioning, in particular with vitrification for HLW; and (3) preparing the future developments of nuclear power generation with advanced reactors, and best Pu use, and keeping open progresses in long lived waste processing and disposal

  2. Radioactive Semivolatiles in Nuclear Fuel Reprocessing

    Energy Technology Data Exchange (ETDEWEB)

    Jubin, R. T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Strachan, D. M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ilas, G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Spencer, B. B. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Soelberg, N. R. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    In nuclear fuel reprocessing, various radioactive elements enter the gas phase from the unit operations found in the reprocessing facility. In previous reports, the pathways and required removal were discussed for four radionuclides known to be volatile, 14C, 3H, 129I, and 85Kr. Other, less volatile isotopes can also report to the off-gas streams in a reprocessing facility. These were reported to be isotopes of Cs, Cd, Ru, Sb, Tc, and Te. In this report, an effort is made to determine which, if any, of 24 semivolatile radionuclides could be released from a reprocessing plant and, if so, what would be the likely quantities released. As part of this study of semivolatile elements, the amount of each generated during fission is included as part of the assessment for the need to control their emission. Also included in this study is the assessment of the cooling time (time out of reactor) before the fuel is processed. This aspect is important for the short-lived isotopes shown in the list, especially for cooling times approaching 10 y. The approach taken in this study was to determine if semivolatile radionuclides need to be included in a list of gas-phase radionuclides that might need to be removed to meet Environmental Protection Agency (EPA) and Nuclear Regulatory Commission (NRC) regulations. A list of possible elements was developed through a literature search and through knowledge and literature on the chemical processes in typical aqueous processing of nuclear fuels. A long list of possible radionuclides present in irradiated fuel was generated and then trimmed by considering isotope half-life and calculating the dose from each to a maximum exposed individual with the US EPA airborne radiological dispersion and risk assessment code CAP88 (Rosnick 1992) to yield a short list of elements that actually need to be considered for control because they require high decontamination factors to meet a reasonable fraction of the regulated release. Each of these elements is

  3. Handbook on process and chemistry of nuclear fuel reprocessing. 3rd edition

    International Nuclear Information System (INIS)

    2015-03-01

    The fundamental data on spent nuclear fuel reprocessing and related chemistry was collected and summarized as a new edition of 'Handbook on Process and Chemistry of Nuclear Fuel Reprocessing'. The purpose of this handbook is contribution to development of the fuel reprocessing and fuel cycle technology for uranium fuel and mixed oxide fuel utilization. Contents in this book was discussed and reviewed by specialists of science and technology on fuel reprocessing in Japan. (author)

  4. RTR spent fuel treatment and final waste storage

    International Nuclear Information System (INIS)

    Thomasson, J.

    2000-01-01

    A number of RTR operators have chosen in the past to send their spent fuel to the US in the framework of the US take back program. However, this possibility ends as of May 12th, 2006. 3 different strategies are left for managing RTR spent fuel: extended storage, direct disposal and treatment-conditioning through reprocessing. Whilst former strategies raise a number of uncertainties, the latter already offers a management solution. It features two advantages. It benefits from the long experience of existing flexible industrial facilities from countries like France. Secondly, it offers a dramatic volume reduction of the ultimate waste to be stored under well-characterized, stable and durable forms. RTR spent fuel management through reprocessing-conditioning offers a durable management solution that can be fully integrated in whatever global radioactive waste management policy, including ultimate disposal

  5. Extending Spent Fuel Storage until Transport for Reprocessing or Disposal

    Energy Technology Data Exchange (ETDEWEB)

    Carlsen, Brett; Chiguer, Mustapha; Grahn, Per; Sampson, Michele; Wolff, Dietmar; Bevilaqua, Arturo; Wasinger, Karl; Saegusa, Toshiari; Seelev, Igor

    2016-09-01

    Spent fuel (SF) must be stored until an end point such as reprocessing or geologic disposal is imple-mented. Selection and implementation of an end point for SF depends upon future funding, legisla-tion, licensing and other factors that cannot be predicted with certainty. Past presumptions related to the availability of an end point have often been wrong and resulted in missed opportunities for properly informing spent fuel management policies and strategies. For example, dry cask storage systems were originally conceived to free up needed space in reactor spent fuel pools and also to provide SFS of up to 20 years until reprocessing and/or deep geological disposal became available. Hundreds of dry cask storage systems are now employed throughout the world and will be relied upon well beyond the originally envisioned design life. Given present and projected rates for the use of nuclear power coupled with projections for SF repro-cessing and disposal capacities, one concludes that SF storage will be prolonged, potentially for several decades. The US Nuclear Regulatory Commission has recently considered 300 years of storage to be appropriate for the characterization and prediction of ageing effects and ageing management issues associated with extending SF storage and subsequent transport. This paper encourages addressing the uncertainty associated with the duration of SF storage by de-sign – rather than by default. It suggests ways that this uncertainty may be considered in design, li-censing, policy, and strategy decisions and proposes a framework for safely extending spent fuel storage until SF can be transported for reprocessing or disposal – regardless of how long that may be. The paper however is not intended to either encourage or facilitate needlessly extending spent fuel storage durations. Its intent is to ensure a design and safety basis with sufficient margin to accommodate the full range of potential future scenarios. Although the focus is primarily on

  6. Environmental aspects of commercial radioactive waste management

    International Nuclear Information System (INIS)

    1979-05-01

    Volume 2 contains chapters 6 through 10: environmental effects related to radioactive waste management associated with LWR fuel reprocessing - mixed-oxide fuel fabrication plant; environmental effects related to transporting radioactive wastes associated with LWR fuel reprocessing and fabrication; environmental effects related to radioactive waste management associated with LWR fuel reprocessing - retrievable waste storage facility; environmental effects related to geologic isolation of LWR fuel reprocessing wastes; and integrated systems for commercial radioactive waste management

  7. Spent fuel reprocessing system availability definition by process simulation

    International Nuclear Information System (INIS)

    Holder, N.; Haldy, B.B.; Jonzen, M.

    1978-05-01

    To examine nuclear fuel reprocessing plant operating parameters such as maintainability, reliability, availability, equipment redundancy, and surge storage requirements and their effect on plant throughput, a computer simulation model of integrated HTGR fuel reprocessing plant operations is being developed at General Atomic Company (GA). The simulation methodology and the status of the computer programming completed on reprocessing head end systems is reported

  8. Krypton separation from waste gas of a reprocessing plant by low temperature rectification

    International Nuclear Information System (INIS)

    1987-01-01

    6 lectures at this seminar describe and evaluate the results of the research and development work on low temperature krypton separation from the waste gas of the reprocessing of nuclear fuels. They are used for making decisions for the process to be used in the future on a large scale at the Wackersdorf reprocessing plant. 2 further lectures deal with alternatives to this process, which were also developed: the freon washing and low temperature adsorption of krypton. All the lectures were included separately in the INIS and ENERGY databases. (RB) [de

  9. Summary of nuclear fuel reprocessing activities around the world

    International Nuclear Information System (INIS)

    Mellinger, P.J.; Harmon, K.M.; Lakey, L.T.

    1984-11-01

    This review of international practices for nuclear fuel reprocessing was prepared to provide a nontechnical summary of the current status of nuclear fuel reprocessing activities around the world. The sources of information are widely varied

  10. Fast reactor system factors affecting reprocessing plant design

    International Nuclear Information System (INIS)

    Allardice, R.H.; Pugh, O.

    1982-01-01

    The introduction of a commercial fast reactor electricity generating system is very dependent on the availability of an efficient nuclear fuel cycle. Selection of fuel element constructional materials, the fuel element design approach and the reactor operation have a significant influence on the technical feasibility and efficiency of the reprocessing and waste management plants. Therefore the fast reactor processing plant requires liaison between many design teams -reactor, fuel design, reprocessing and waste management -often with different disciplines and conflicting objectives if taken in isolation and an optimised approach to determining several key parameters. A number of these parameters are identified and the design approach discussed in the context of the reprocessing plant. Radiological safety and its impact on design is also briefly discussed. (author)

  11. Burning of MOX fuels in LWRs; fuel history effects on thermal properties of hull and end piece wastes and the repository performance

    International Nuclear Information System (INIS)

    Hirano, Fumio; Sato, Seichi; Kozaki, Tamotsu

    2012-01-01

    The thermal impacts of hull and end piece wastes from the reprocessing of MOX spent fuels burned in LWRs on repository performance were investigated. The heat generation rates in MOX spent fuels and the resulting heat generation rates in hull and end piece wastes change depending on the history of MOX fuels. This history includes the burn-up of UO 2 spent fuels from which the Pu is obtained, the cooling period before reprocessing, the storage period of fresh MOX fuels before being loaded into an LWR, as well as the burn-up of the MOX fuels. The heat generation rates in hull and end piece wastes from the reprocessing of MOX spent fuels with any of those histories are significantly larger than those from UO 2 spent fuels with burn-ups of 45 GWd/THM. If a temperature below 80degC is specified for cement-based materials used in waste packages after disposal, the allowable number of canisters containing compacted hull and end pieces in a package for 45 and 70 GWd-MOX needs to be limited to a value of 0.4-1.6, which is significantly lower than 4.0 for 45 GWd-UO 2 . (author)

  12. Status report: waste incineration and fixation for Waste Management, Production, and Reprocessing Division of the Department of Energy (July--December 1976)

    International Nuclear Information System (INIS)

    Ziegler, D.L.; White, J.W.; Johnson, A.J.; Fong, L.Q.; Teter, A.R.; Chung, S.F.

    1977-01-01

    Fluidized bed incineration and waste fixation processes are being used to process the types of wastes expected from nuclear fuel reprocessing and production plants. Test incineration runs have been made on two types of wastes: high efficiency particulate air (HEPA) filters and tributyl phosphate-solvent solutions. Laboratory-scale vitrification equipment was used to produce glass pellets from incinerator ash and blends of other expected waste streams. Computer modeling gave an expected product integrity life of over 2,000 years

  13. Reprocessing the truth

    International Nuclear Information System (INIS)

    Goldsmith, E.; Bunyard, P.; Hildyard, N.

    1978-01-01

    Comments are made on the Report by the Inspector, Mr. Justice Parker, after the public inquiry into the application by British Nuclear Fuels Limited for permission to construct and operate a thermal oxide reprocessing plant at their Windscale works. Particular questions raised include: corrosion or storage of spent fuel, vitrification of radioactive waste; radiation effects, and permissible levels; radioactive emissions, critical groups and critical pathways; risks; reprocessing economics; commitment to the FBR; sociological aspects, including employment, nuclear weapon proliferation and terrorism, and Britain's moral responsibilities. (U.K.)

  14. The conditioned reprocessing waste returns. An overview of the question

    International Nuclear Information System (INIS)

    Donato, A.

    1987-01-01

    Although the spent nuclear fuel reprocessing is at present under careful reconsideration and analysis in several countries, the economics, the environmental and health protection aspects being taken into consideration by many experts, it is nevertheless currently carried out in Great Britain and in France as a commercial service offered to the domestic utilities an to foreign customers, according to the contracts and the agreements signed in the past. Such contracts have been signed with COGEMA and/or BNFL by seven countries: Germany, Sweden, Japan, Belgium, Switzerland, Italy, Holland. As a consequence of this, a big number of high level radioactive glass containers and of cemented and bituminized waste will be returned in order to be stored and disposed off in these European countries and in Japan. The disposal of the conditioned wastes will only be possible if their characteristics comply with the acceptance criteria established or to be established in each customer country. A brief review of the situation will be presented in this paper, particular attention being given to the problems possibly arising from the acceptance point of view of the different reprocessing waste categories

  15. Composite reprocessing of spent nuclear fuel - is a way to low waste nuclear power

    International Nuclear Information System (INIS)

    Kosyakov, Valentin

    2005-01-01

    Further development of nuclear power in many respects depend on the solution of the problems connected to high level radioactive wastes (HLRW), containing highly toxic long-lived radionuclides. Long-term controlled storage of HLRW manages expensively and any advanced technology of reprocessing of spent nuclear fuel (SNF), besides recovery of the basic products, should be aimed at the reduction of this waste amount. However, the existing SNF reprocessing technology, using PUREX - process, is aimed only at extraction of uranium and plutonium, considering the remaining fraction (other transuranium elements and all fission products) as HLRW. In this work an attempt is made to give quantitative and qualitative characteristics to the isotopes and the elements which are included in the composition of HLRW after 15-years storage. Depending on the radiation properties of the isotopes included, these elements were divided into three categories: 1. The elements represented by only stable isotopes; 2. The elements represented by mostly low radioactive isotopes; 3. The elements represented by highly toxic long-lived radionuclides. As a result it appeared, that the weight percentage of the elements of the first, the second and the third categories in HLRW was: 60, 25 and 15% respectively. It means, that the amount of the real HLRW to be disposed in a deep geological repository could be reduced at least by a factor of 6, if to recover completely only 7 most dangerous elements (Sr, J, Cs, Sm, Np, Am and Cm) from the solution remaining after extraction of uranium and plutonium. Then it is meaningful to recover the elements of the first category from the remaining mix. As the main part of this fraction is represented by rare earth elements and noble metals, which can easily find many useful application. (author)

  16. The reprocessing-recycling of spent nuclear fuel. Actinides separation - Application to wastes management; Le traitement-recyclage du combustible nucleaire use. La separation des actinides - Application a la gestion des dechets

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    After its use in the reactor, the spent fuel still contains lot of recoverable material for an energetic use (uranium, plutonium), but also fission products and minor actinides which represent the residues of nuclear reactions. The reprocessing-recycling of the spent fuel, as it is performed in France, implies the chemical separation of these materials. The development and the industrial implementation of this separation process represent a major contribution of the French science and technology. The reprocessing-recycling allows a good management of nuclear wastes and a significant saving of fissile materials. With the recent spectacular rise of uranium prices, this process will become indispensable with the development of the next generation of fast neutron reactors. This book takes stock of the present and future variants of the chemical process used for the reprocessing of spent fuels. It describes the researches in progress and presents the stakes and recent results obtained by the CEA. content: the separation of actinides, a key factor for a sustainable nuclear energy; the actinides, a discovery of the 20. century; the radionuclides in nuclear fuels; the aquo ions of actinides; some redox properties of actinides; some complexing properties of actinide cations; general considerations about treatment processes; some characteristics of nuclear fuels in relation with their reprocessing; technical goals and specific constraints of the PUREX process; front-end operations of the PUREX process; separation and purification operations of the PUREX process; elaboration of finite products in the framework of the PUREX process; management and treatment of liquid effluents; solid wastes of the PUREX process; towards a joint management of uranium and plutonium: the COEX{sup TM} process; technical options of treatment and recycling techniques; the fuels of generation IV reactors; front-end treatment processes of advanced fuels; hydrometallurgical processes for future fuel

  17. Open problems in reprocessing of a molten salt reactor fuel

    International Nuclear Information System (INIS)

    Lelek, Vladimir; Vocka, Radim

    2000-01-01

    The study of fuel cycle in a molten salt reactor (MSR) needs deeper understanding of chemical methods used for reprocessing of spent nuclear fuel and preparation of MSR fuel, as well as of the methods employed for reprocessing of MSR fuel itself. Assuming that all the reprocessing is done on the basis of electrorefining, we formulate some open questions that should be answered before a flow sheet diagram of the reactor is designed. Most of the questions concern phenomena taking place in the vicinity of an electrode, which influence the efficiency of the reprocessing and sensibility of element separation. Answer to these questions would be an important step forward in reactor set out. (Authors)

  18. Management of radioactive wastes from the nuclear fuel cycle

    International Nuclear Information System (INIS)

    1976-01-01

    The increased emphasis in many countries on the development and utilization of nuclear power is leading to an expansion of all sectors of the nuclear fuel cycle, giving rise to important policy issues and radioactive-waste management requirements. Consequently, the IAEA and the Nuclear Energy Agency of OECD felt that it would be timely to review latest technology for the management of the radioactive wastes arising from nuclear fuel cycle facilities, to identify where important advances have been made, and to indicate those areas where further technological development is needed. Beginning in 1959, the IAEA, either by itself or jointly with OECD/NEA has held seven international symposia on the management of radioactive wastes. The last symposium, on the management of radioactive wastes from fuel reprocessing, was held jointly by the IAEA and OECD/NEA in Paris in November 1972. An objective of the 1976 symposium was to update the information presented at the previous symposia with the latest technological developments and thinking regarding the management and disposal of all categories of radioactive wastes. Consequently, although the scope of the symposium was rather broad, attention was focussed on operational experience and progress in unresolved areas of radioactive waste management. The programme dealt primarily with the solidification of liquid radioactive wastes and disposal of the products, especially the high-level fission products and actinide-containing waste from fuel reprocessing. Other topics covered policy and planning, treatment of hulls and solvent, management of plutonium-contaminated waste, and removal of gaseous radionuclides. The major topic of interest was the current state of the technology for the reduction and incorporation of the high-level radioactive liquid from fuel reprocessing into solid forms, such as calcines, glasses or ceramics, for safe interim storage and eventual disposal. The approaches to vitrification ranged from two stage

  19. Reprocessing and fuel fabrication systems

    International Nuclear Information System (INIS)

    Field, F.R.; Tooper, F.E.

    1978-01-01

    The study of alternative fuel cycles was initiated to identify a fuel cycle with inherent technical resistance to proliferation; however, other key features such as resource use, cost, and development status are major elements in a sound fuel cycle strategy if there is no significant difference in proliferation resistance. Special fuel reprocessing techniques such as coprocessing or spiking provide limited resistance to diversion. The nuclear fuel cycle system that will be most effective may be more dependent on the institutional agreements that can be implemented to supplement the technical controls of fuel cycle materials

  20. Methodology for estimating reprocessing costs for nuclear fuels

    International Nuclear Information System (INIS)

    Carter, W.L.; Rainey, R.H.

    1980-02-01

    A technological and economic evaluation of reprocessing requirements for alternate fuel cycles requires a common assessment method and a common basis to which various cycles can be related. A methodology is described for the assessment of alternate fuel cycles utilizing a side-by-side comparison of functional flow diagrams of major areas of the reprocessing plant with corresponding diagrams of the well-developed Purex process as installed in the Barnwell Nuclear Fuel Plant (BNFP). The BNFP treats 1500 metric tons of uranium per year (MTU/yr). Complexity and capacity factors are determined for adjusting the estimated facility and equipment costs of BNFP to determine the corresponding costs for the alternate fuel cycle. Costs of capacities other than the reference 1500 MT of heavy metal per year are estimated by the use of scaling factors. Unit costs of reprocessed fuel are calculated using a discounted cash flow analysis for three economic bases to show the effect of low-risk, typical, and high-risk financing methods

  1. Estimation of gamma dose rate from hulls and shield design for the hull transport cask of Fuel Reprocessing Plant (FRP)

    International Nuclear Information System (INIS)

    Chandrasekaran, S.; Rajagopal, V.; Jose, M.T.; Venkatraman, B.

    2012-01-01

    In Fuel Reprocessing Plant (FRP), un-dissolved clad of fuel pins known as hulls are the major sources of high level solid waste. Safe handling, transport and disposal require the estimation of radioactivity as a consequent of gamma dose rate from hulls in fast reactor fuel reprocessing plant in comparison with thermal reactor fuel. Due to long irradiation time and low cooling of spent fuel, the evolution of activation products 51 Cr, 58 Co, 54 Mn and 59 Fe present as impurities in the fuel clad are the major sources of gamma radiation. Gamma dose rate from hull container with hulls from Fuel Sub Assembly (FSA) and Radial Sub Assembly (RSA) of Fuel Reprocessing Plant (FRP) was estimated in order to design the hull transport cask. Shielding computations were done using point kernel code, IGSHIELD. This paper describes the details of source terms, estimation of dose rate and shielding design of hull transport cask in detail. (author)

  2. Waste disposal from the light water reactor fuel cycle

    International Nuclear Information System (INIS)

    Costello, J.M.; Hardy, C.J.

    1981-05-01

    Alternative nuclear fuel cycles for support of light water reactors are described and wastes containing naturally occurring or artificially produced radioactivity reviewed. General principles and objectives in radioactive waste management are outlined, and methods for their practical application to fuel cycle wastes discussed. The paper concentrates upon management of wastes from upgrading processes of uranium hexafluoride manufacture and uranium enrichment, and, to a lesser extent, nuclear power reactor wastes. Some estimates of radiological dose commitments and health effects from nuclear power and fuel cycle wastes have been made for US conditions. These indicate that the major part of the radiological dose arises from uranium mining and milling, operation of nuclear reactors, and spent fuel reprocessing. However, the total dose from the fuel cycle is estimated to be only a small fraction of that from natural background radiation

  3. Correlation of radioactive waste treatment costs and the environmental impact of waste effluents in the nuclear fuel cycle: reprocessing of high-temperature gas-cooled reactor fuel containing U-233 and thorium

    International Nuclear Information System (INIS)

    Davis, W. Jr.; Blanco, R.E.; Finney, B.C.; Hill, G.S.; Moore, R.E.; Witherspoon, J.P.

    1976-05-01

    A cost/benefit study was made to determine the cost and effectiveness of various radioactive waste (radwaste) treatment systems for decreasing the release of radioactive materials from a model high-temperature gas-cooled reactor (HTGR) fuel reprocessing plant and to determine the radiological impact (dose commitment) of the released materials on the environment. The study is designed to assist the U. S. Nuclear Regulatory Commission in defining the term as low as reasonably achievable as it applies to this nuclear facility. The base case is representative of conceptual, developing technology of head-end graphite-burning operations and of extensions of solvent-extraction technology of current designs for light-water-reactor (LWR) fuel reprocessing plants. The model plant has an annual capacity of 450 metric tons of heavy metal (MTHM, where heavy metal is uranium plus thorium), as charged to about fifty 1000-MW(e) HTGRs. Additional radwaste treatment systems are added to the base-case plant in a series of case studies to decrease the amounts of radioactive materials released and to reduce the radiological dose commitment to the population in the surrounding area. The capital and annual costs for the added waste treatment operations and the corresponding reductions in dose commitments are calculated for each case. In the final analysis, the cost/benefit of each case, calculated as additional cost of radwaste system divided by the reduction in dose commitment, is tabulated or the dose commitment is plotted with cost as the variable. The status of each of the radwaste treatment methods used in the case studies is discussed

  4. Research on advanced aqueous reprocessing of spent nuclear fuel: literature study

    Energy Technology Data Exchange (ETDEWEB)

    Van Hecke, K.; Goethals, P.

    2006-07-15

    The goal of the partitioning and transmutation strategy is to reduce the radiotoxicity of spent nuclear fuel to the level of natural uranium in a short period of time (about 1000 years) and thus the required containment period of radioactive material in a repository. Furthermore, it aims to reduce the volume of waste requiring deep geological disposal and hence the associated space requirements and costs. Several aqueous as well as pyrochemical separation processes have been developed for the partitioning of the long-lived radionuclides from the remaining of the spent fuel. This report aims to describe and compare advanced aqueous reprocessing methods.

  5. Research on advanced aqueous reprocessing of spent nuclear fuel: literature study

    International Nuclear Information System (INIS)

    Van Hecke, K.; Goethals, P.

    2006-01-01

    The goal of the partitioning and transmutation strategy is to reduce the radiotoxicity of spent nuclear fuel to the level of natural uranium in a short period of time (about 1000 years) and thus the required containment period of radioactive material in a repository. Furthermore, it aims to reduce the volume of waste requiring deep geological disposal and hence the associated space requirements and costs. Several aqueous as well as pyrochemical separation processes have been developed for the partitioning of the long-lived radionuclides from the remaining of the spent fuel. This report aims to describe and compare advanced aqueous reprocessing methods.

  6. Consolidated fuel reprocessing program. Developments for the future in reprocessing

    International Nuclear Information System (INIS)

    Burch, W.D.

    1982-01-01

    The future reprocessing developments focus on three major areas: (1) the retention of gaseous fission products to reduce off-site doses to very low values; (2) the initial steps of breakdown, shearing, and dissolution of breeder fuels; and (3) advanced facility and equipment concepts, which are expected to lead to a reliable, cost-effective, totally remotely operated and maintained plant. Work in the first area - removal of fission gases (the most important of which is 85 Kr) - is largely completed through tracer and bench-scale engineering equipment. Efforts are now mainly devoted to breeder fuels and advanced remote concepts. A facility, the Integrated Equipment Test Facility, which will be used to carry out much of this work, is nearing completion in Oak Ridge. In it a large, simulated, remote reprocessing cell will house a disassembly-shear machine for either breeder or LWR fuels, a rotary continuous dissolver, a solvent extraction cycle utilizing a new generation of centrifugal contactors, and related equipment

  7. Method of reprocessing nuclear fuel using vacuum freeze-drying method

    International Nuclear Information System (INIS)

    Otsuka, Katsuyuki; Kondo, Isao.

    1989-01-01

    Solutions of plutonium nitrate and uranyl nitrate, spent solvents and liquid wastes separated by the treatment in the solvent extractant steps in the wet processing steps of re-processing plants or fuel fabrication plants are processed by means of freeze-drying under vacuum. Then, the solutions of plutonium nitrate and uranyl nitrate are separated into nitrates and liquid condensates and the spent solvents are freeze-dried. Thus, they are separated into tri-n-butyl phosphate, diester, monoester and n-dodecane and the liquid wastes are processed by means of freeze-drying and separated into liquids and residues. In this way, since sodium carbonate, etc. are not used, the amount of resultant liquid wastes is reduced and sodium is not contained in liquid wastes sent to an asphalt solidification step and a vitrification step, the processing steps can be simplified. (S.T.)

  8. Report of the IAEA advisory group meeting on LMFBR fuel reprocessing

    International Nuclear Information System (INIS)

    1976-05-01

    A summary of the papers and discussions of the meeting is presented, reviewing the status of development in LMFBR fuel reprocessing and focusing attention on important problem areas. The following topics are discussed: Transport, storage and removal of sodium; decladding and shearing; dissolution; Purex process; fluoride volatility method; off-gas purification; waste disposal. Status reports of national programmes of Belgium, France, Federal Republic of Germany, Italy, Japan, United Kingdom, USSR and USA are included

  9. Critical experiment needs and plans of the consolidated fuel reprocessing program

    International Nuclear Information System (INIS)

    Primm, R.T.

    1984-01-01

    An integral part of the United States Department of Energy (DOE) plan for the development of breeder reactors is the development of the capability for fuel reprocessing. The Consolidated Fuel Reprocessing Program (CFRP) was established by the DOE to identify and conduct research and development activities in this area. The DOE is currently proposing that a capability to reprocess fast reactor fuel be established in the Fuels and Materials Examination Facility at the Hanford Engineering Development Laboratory. This capability would include conversion of plutonium nitrate to plutonium oxide. The reprocessing line is designated the Breeder Reprocessing Engineering Test (BRET). Criticality safety remains an important critetion in the design of the BRET. The different steps in the reprocessing are reviewed and areas where additional critical experiments are needed have been indentified as also areas where revision or clarification of existing criticality safety standards are desirable

  10. Technology development of fast reactor fuel reprocessing technology in India

    International Nuclear Information System (INIS)

    Natarajan, R.; Raj, Baldev

    2009-01-01

    India is committed to the large scale induction of fast breeder reactors beginning with the construction of 500 MWe Prototype Fast Breeder Reactor, PFBR. Closed fuel cycle is a prerequisite for the success of the fast reactors to reduce the external dependence of the fuel. In the Indian context, spent fuel reprocessing, with as low as possible out of pile fissile inventory, is another important requirement for increasing the share in power generation through nuclear route as early as possible. The development of this complex technology is being carried out in four phases, the first phase being the developmental phase, in which major R and D issues are addressed, while the second phase is the design, construction and operation of a pilot plant, called CORAL (COmpact Reprocessing facility for Advanced fuels in Lead shielded cell. The third phase is the construction and operation of Demonstration of Fast Reactor Fuel Reprocessing Plant (DFRP) which will provide experience in fast reactor fuel reprocessing with high availability factors and plant throughput. The design, construction and operation of the commercial plant (FRP) for reprocessing of PFBR fuel is the fourth phase, which will provide the requisite confidence for the large scale induction of fast reactors

  11. Safeguarding a future industrial reprocessing plant

    International Nuclear Information System (INIS)

    1978-11-01

    This paper is submitted to Working Group 5, Sub-Group B for information. It is being submitted to Working Group 4 for discussion at their meeting in January 1979 and shows that by a combination of accountancy, surveillance and containment a reliable safeguards system can be designed for the reprocessing of fuels of the BWR and PWR type. Its arguments can, in general terms, be applied to plants for reprocessing LMFBR fuels, with due allowance for future advances which should improve our overall knowledge of the reliability of safeguards systems. In the reprocessing of fast reactor (LMFBR) fuels, as compared with LWR fuels, the main differences are the higher plutonium concentration and lower heavy metal throughput in the early stages of the reprocessing operations. At later stages in the process (after plutonium/uranium separation) the plants could be similar and have similar safeguarding problems. Plants for reprocessing LMFBR on a commercial scale will not be in operation for a number of years. In these plants greater attention may have to be paid to safeguards at the early stages, especially to waste/raffinate streams, than in the PWR/BWR reprocessing plant. The actual balance between containment, surveillance and accountancy adopted will depend on the status of the technology of safeguards and reprocessing. It can be anticipated that improvements to measurement systems will be made which may allow greater reliance on actual measurement. Treatment and recycle of solid wastes will advance and could therefore lead to improvements in accountancy in, for example, the ''head-end''

  12. Requirements for near-real-time accounting of strategic nuclear materials in nuclear fuel reprocessing

    International Nuclear Information System (INIS)

    Hakkila, E.A.; Cobb, D.D.; Dietz, R.J.; Shipley, J.P.; Smith, D.B.

    1978-01-01

    A Purex-based nuclear fuel reprocessing plant has been studied for possible incorporation of near-real-time accounting to supplement conventional accounting procedures. Near-real-time accounting of special nuclear materials relies on in-line or at-line flow measurements and plutonium assay of product and waste streams, complemented by conventional analytical chemistry for daily instrument calibrations. In-line alpha monitors could be used for waste stream measurements of plutonium, even in the presence of high beta-gamma fluxes from fission products. X-ray absorption edge densitometry using either K- or L-absorption edges could be used for plutonium concentration measurements in main product streams. Some problem areas identified in waste stream measurements include measurements of leached hulls and of centrifuge sludge. Conventional analytical chemical methods for measuring plutonium in weapons grade material can be modified for reprocessed plutonium. Analytical techniques requiring special precautions will be reviewed

  13. Operating experience in reprocessing

    International Nuclear Information System (INIS)

    Schueller, W.

    1983-01-01

    Since 1953, reprocessing has accumulated 180 years of operating experience in ten plants, six of them with 41 years of operation in reprocessing oxide fuel from light water reactors. After abortive, premature attempts at what is called commercial reprocessing, which had been oriented towards the market value of recoverable uranium and plutonium, non-military reprocessing technologies have proved their technical feasibility, since 1966 on a pilot scale and since 1976 on an industrial scale. Reprocessing experience obtained on uranium metal fuel with low and medium burnups can now certainly be extrapolated to oxide fuel with high burnup and from pilot plants to industrial scale plants using the same technologies. The perspectives of waste management of the nuclear power plants operated in the Federal Republic of Germany should be viewed realistically. The technical problems still to be solved are in a balanced relationship to the benefit arising to the national economy out of nuclear power generation and can be solved in time, provided there are clearcut political boundary conditions. (orig.) [de

  14. PRELIMINARY STUDY OF CERAMICS FOR IMMOBILIZATION OF ADVANCED FUEL CYCLE REPROCESSING WASTES

    Energy Technology Data Exchange (ETDEWEB)

    Fox, K.; Billings, A.; Brinkman, K.; Marra, J.

    2010-09-22

    The Savannah River National Laboratory (SRNL) developed a series of ceramic waste forms for the immobilization of Cesium/Lanthanide (CS/LN) and Cesium/Lanthanide/Transition Metal (CS/LN/TM) waste streams anticipated to result from nuclear fuel reprocessing. Simple raw materials, including Al{sub 2}O{sub 3}, CaO, and TiO{sub 2} were combined with simulated waste components to produce multiphase ceramics containing hollandite-type phases, perovskites (particularly BaTiO{sub 3}), pyrochlores, zirconolite, and other minor metal titanate phases. Identification of excess Al{sub 2}O{sub 3} via X-ray Diffraction (XRD) and Scanning Electron Microscopy with Energy Dispersive Spectroscopy (SEM/EDS) in the first series of compositions led to a Phase II study, with significantly reduced Al{sub 2}O{sub 3} concentrations and increased waste loadings. Three fabrication methodologies were used, including melting and crystallizing, pressing and sintering, and Spark Plasma Sintering (SPS), with the intent of studying phase evolution under various sintering conditions. XRD and SEM/EDS results showed that the partitioning of the waste elements in the sintered materials was very similar, despite varying stoichiometry of the phases formed. The Phase II compositions generally contained a reduced amount of unreacted Al{sub 2}O{sub 3} as identified by XRD, and had phase assemblages that were closer to the initial targets. Chemical composition measurements showed no significant issues with meeting the target compositions. However, volatilization of Cs and Mo was identified, particularly during melting, since sintering of the pressed pellets and SPS were performed at lower temperatures. Partitioning of some of the waste components was difficult to determine via XRD. SEM/EDS mapping showed that those elements, which were generally present in small concentrations, were well distributed throughout the waste forms. Initial studies of radiation damage tolerance using ion beam irradiation at Los

  15. Monitoring of releases from an irradiated fuel reprocessing plant

    International Nuclear Information System (INIS)

    Fitoussi, L.

    1978-01-01

    At its UP 2 plant, the La Hague facility reprocesses irradiated fuel by the PUREX process. The fuel stems from graphite/gas, natural-uranium reactors and pressurized or boiling water enriched-uranium reactors. The gaseous effluents are collected and purified by high-efficiency washing and filtration. After purification the gas stream is discharged into the atmosphere by a single stack, 100m high and 6m in diameter, located at a high point on the site (184m). The radionuclides released into the air are: krypton-85, iodine-129 and -131, and tritium. The liquid effluents are collected by drainage systems, which transfer them to the effluent treatment station in the case of active or suspect solutions. Active solutions undergo treatment by chemical and physical processes. After purification the waste water is released into the sea by an underwater drainage system 5km long, which brings the outlet point into the middle of a tidal current 2km offshore. The radionuclides contained in the purified waste water are fission products originating from irradiated fuels in only slightly variable proportions, in which ruthenium-rhodium-106 predominates. Traces of the transuranium elements are also found in these solutions

  16. Waste streams from reprocessing operations

    International Nuclear Information System (INIS)

    Andersson, B.; Ericsson, A.-M.

    1978-03-01

    The three main products from reprocessing operations are uranium, plutonium and vitrified high-level-waste. The purpose of this report is to identify and quantify additional waste streams containing radioactive isotops. Special emphasis is laid on Sr, Cs and the actinides. The main part, more than 99 % of both the fission-products and the transuranic elements are contained in the HLW-stream. Small quantities sometimes contaminate the U- and Pu-streams and the rest is found in the medium-level-waste

  17. Status and trends in spent fuel reprocessing

    International Nuclear Information System (INIS)

    2005-09-01

    The management of spent fuel arising from nuclear power production is a crucial issue for the sustainable development of nuclear energy. The IAEA has issued several publications in the past that provide technical information on the global status and trends in spent fuel reprocessing and associated topics, and one reason for this present publication is to provide an update of this information which has mostly focused on the conventional technology applied in the industry. However, the scope of this publication has been significantly expanded in an attempt to make it more comprehensive and by including a section on emerging technologies applicable to future innovative nuclear systems, as are being addressed in such international initiatives as INPRO, Gen IV and MICANET. In an effort to be informative, this publication attempts to provide a state-of-the-art review of these technologies, and to identify major issues associated with reprocessing as an option for spent fuel management. It does not, however, provide any detailed information on some of the related issues such as safety or safeguards, which are addressed in other relevant publications. This report provides an overview of the status of reprocessing technology and its future prospects in terms of various criteria in Section 2. Section 3 provides a review of emerging technologies which have been attracting the interest of Member States, especially in the international initiatives for future development of innovative nuclear systems. A historical review of IAEA activities associated with spent fuel reprocessing, traceable back to the mid-1970s, is provided in Section 4, and conclusions in Section 5. A list of references is provided at the end the main text for readers interested in further information on the related topics. Annex I summarizes the current status of reprocessing facilities around the world, including the civil operational statistics of Purex-based plants, progress with decommissioning and

  18. Chemistry of materials relevant to aqueous reprocessing and waste management

    International Nuclear Information System (INIS)

    Srinivasan, T.G.

    2012-01-01

    Nuclear energy option will be an inevitable one with the fossil fuels depleting fast and present coal and oil based thermal power generation resulting in unwanted green house gas emission. The utilisation of the fissile resources will be more effective with closed fuel cycle option wherein the spent reactor fuel is reprocessed and the unused uranium and plutonium formed during the reactor operation is recovered and re-used. Of the aqueous and non-aqueous routes available to reprocess the spent nuclear fuels, aqueous reprocessing method of recovering the valuable uranium and plutonium by the PUREX process is in vogue for the past six decades. The process involves chopping the fuel into small lengths, leaching uranium and plutonium with concentrated nitric acid under reflux, conditioning the dissolver solution with respect to acidity and valency of U and Pu, solvent extraction with 30%TBP/n-DD to selectively extract U(VI) and Pu(IV) leaving most of the fission products into the raffinate, partitioning plutonium from uranium and reconversion of U and Pu into oxide forms after further purification. Many reagents are used to achieve near quantitative recovery of both uranium and plutonium (>99.9%) and with high decontamination factors (>10 7 ) from highly radioactive fission products. Nevertheless, the chemistry of several reagents used and the chemical processes that take place during the entire course of reprocessing and waste management operations are yet to be fully understood and gives a lot of scope for further improvements. Some examples where research requires concerted efforts are, 1) development of new extractants conforming to CHON principle, with acceptable physical properties, high stability, selectivity and resistance to third phase formation, 2) new partitioning reagents and processes which offer good efficiency and kinetics for uranium/plutonium reduction, 3) understanding the chemistry of troublesome fission products such as Tc, Ru and Zr, 4

  19. The case for reprocessing: the operational experience of a modern reprocessing industry

    International Nuclear Information System (INIS)

    Giraud, J.P.; Kelly, W.

    1993-01-01

    Reprocessing is a high-tech industry that works. An impressive effort of R and D, industrial deployment and operational experience has been accumulated by COGEMA and BNFL, leading these companies to offer a commercial service which is the only proper management of spent fuel and waste that is both technically demonstrated and qualified by the safety authorities of European and overseas countries. Reprocessing, as every technology-based industry will continue to progress in the future. Recycling the fissile materials reclaimed from spent fuel: uranium and plutonium, is the complementary and indispensable last link to effectively close the fuel cycle and control in particular the production of plutonium and other long-lived actinides. This paper will describe the state of development attained in France and Great Britain and will underline the main advantages of the reprocessing/recycling strategy

  20. Second annual report of the Canadian nuclear fuel waste management program

    International Nuclear Information System (INIS)

    Boulton, J.

    1980-12-01

    This report, the second of a series of annual reports, reviews in general terms the progress which has been achieved in the research and development program for the safe, permanent disposal of Canada's nuclear fuel wastes. The report summarizes activities over the past year, in the areas of public interaction, used fuel storage and transportation, immobilization of used fuel and fuel reprocessing wastes, research and development associated with deep underground disposal, and environmental and safety assessment. (auth)

  1. Idaho Chemical Processing Plant Spent Fuel and Waste Management Technology Development Program Plan

    International Nuclear Information System (INIS)

    1993-09-01

    The Department of Energy (DOE) has received spent nuclear fuel (SNF) at the Idaho Chemical Processing Plant (ICPP) for interim storage and reprocessing since 1953. Reprocessing of SNF has resulted in an existing inventory of 1.5 million gallons of radioactive sodium-bearing liquid waste and 3800 cubic meters (m 3 ) of calcine, in addition to the 768 metric tons (MT) of SNF and various other fuel materials in inventory. To date, the major activity of the ICPP has been the reprocessing of SNF to recover fissile uranium; however, recent changes in world events have diminished the demand to recover and recycle this material. As a result, DOE has discontinued reprocessing SNF for uranium recovery, making the need to properly manage and dispose of these and future materials a high priority. In accordance with the Nuclear Waste Policy Act (NWPA) of 1982, as amended, disposal of SNF and high-level waste (HLW) is planned for a geological repository. Preparation of SNF, HLW, and other radioactive wastes for disposal may include mechanical, physical, and/or chemical processes. This plan outlines the program strategy of the ICPP Spent Fuel and Waste Management Technology Development Program (SF ampersand WMTDP) to develop and demonstrate the technology required to ensure that SNF and radioactive waste will properly stored and prepared for final disposal. Program elements in support of acceptable interim storage and waste minimization include: developing and implementing improved radioactive waste treatment technologies; identifying and implementing enhanced decontamination and decommissioning techniques; developing radioactive scrap metal (RSM) recycle capabilities; and developing and implementing improved technologies for the interim storage of SNF

  2. Performance of borosilicate glass, Synroc and spent fuel as nuclear waste forms

    International Nuclear Information System (INIS)

    Lutze, W.; Grambow, B.; Ewing, R.C.

    1990-01-01

    Presently, there are three prominent waste forms under consideration for the disposal of high-level waste: Borosilicate glass and Synroc for high-level radioactive waste from fuel reprocessing and spent fuel as the waste form for non-reprocessed fuel. Using the present experimental data base, one may compare the performance of these three waste forms under repository relevant conditions. In low water flow regimes and at temperatures less than 100 degree C, the fractional release rates of all three waste forms are low, on the order of 10-7/d or less and may decrease with time. Under these conditions the three waste forms behave similarly. At elevated temperatures or in high flow regimes, the durability of borosilicate glass will be much less than that of Synroc, and thus, for certain disposal schemes (e.g., deep burial) Synroc is preferable. All predictions of the long-term behavior are based on the extrapolation of short term experimental data, we point out that appropriate and useful natural analogues are available for each of these waste forms and should be used in the performance assessment of each waste form's long-term behavior. 14 refs

  3. Nuclear fuel reprocessing deactivation plan for the Idaho Chemical Processing Plant, Revision 1

    International Nuclear Information System (INIS)

    Patterson, M.W.

    1994-10-01

    The decision was announced on April 28, 1992 to cease all United States Department of Energy (DOE) reprocessing of nuclear fuels. This decision leads to the deactivation of all fuels dissolution, solvent extraction, krypton gas recovery operations, and product denitration at the Idaho Chemical Processing Plant (ICPP). The reprocessing facilities will be converted to a safe and stable shutdown condition awaiting future alternate uses or decontamination and decommissioning (D ampersand D). This ICPP Deactivation Plan includes the scope of work, schedule, costs, and associated staffing levels necessary to achieve a safe and orderly deactivation of reprocessing activities and the Waste Calcining Facility (WCF). Deactivation activities primarily involve shutdown of operating systems and buildings, fissile and hazardous material removal, and related activities. A minimum required level of continued surveillance and maintenance is planned for each facility/process system to ensure necessary environmental, health, and safety margins are maintained and to support ongoing operations for ICPP facilities that are not being deactivated. Management of the ICPP was transferred from Westinghouse Idaho Nuclear Company, Inc. (WINCO) to Lockheed Idaho Technologies Company (LITCO) on October 1, 1994 as part of the INEL consolidated contract. This revision of the deactivation plan (formerly the Nuclear Fuel Reprocessing Phaseout Plan for the ICPP) is being published during the consolidation of the INEL site-wide contract and the information presented here is current as of October 31, 1994. LITCO has adopted the existing plans for the deactivation of ICPP reprocessing facilities and the plans developed under WINCO are still being actively pursued, although the change in management may result in changes which have not yet been identified. Accordingly, the contents of this plan are subject to revision

  4. Light water reactor fuel reprocessing and recycling

    International Nuclear Information System (INIS)

    1977-07-01

    This document was originally intended to provide the basis for an environmental impact statement to assist ERDA in making decisions with respect to possible LWR fuel reprocessing and recycling programs. Since the Administration has recently made a decision to indefinitely defer reprocessing, this environmental impact statement is no longer needed. Nevertheless, this document is issued as a report to assist the public in its consideration of nuclear power issues. The statement compares the various alternatives for the LWR fuel cycle. Costs and environmental effects are compared. Safeguards for plutonium from sabotage and theft are analyzed

  5. Reprocessing ability of high density fuels for research and test reactors

    International Nuclear Information System (INIS)

    Gay, A.; Belieres, M.

    1997-01-01

    The development of a new high density fuel is becoming a key issue for Research Reactors operators. Such a new fuel should be a Low Enrichment Uranium (LEU) fuel with a high density, to improve present in core performances. It must be compatible with the reprocessing in an industrial plant to provide a steady back-end solution. Within the framework of a work group CEA/CERCA/COGEMA on new fuel development for Research Reactors, COGEMA has performed an evaluation of the reprocessing ability of some fuel dispersants selected as good candidates. The results will allow US to classify these fuel dispersants from a reprocessing ability point of view. (author)

  6. The management of intermediate-level radioactive wastes arising from reprocessing operations

    International Nuclear Information System (INIS)

    Elsden, A.D.

    1984-01-01

    The reprocessing of spent nuclear fuel results in the generation of radioactive wastes in the form of liquids, gases and solids. This paper outlines the principles and major elements of the waste management systems currently in use or under development for the category of waste known as intermediate-level wastes. To enable implementation of an optimized waste management system, engineering process evaluations, development and design in the following areas are required: The definition of cost effective options taking account of constraints which may arise from other operations in the overall system, e.g. from transport requirements or from criteria derived from environmental impact assessments of alternative disposal routes; Plant and equipment development to enable acceptable system and active plant operations on an industrial scale; Safety and reliability studies to ensure adequate protection of both the general public and plant operators during all stages of the waste management system including disposal

  7. Radioactive waste management: a series of bibliographies. Nuclear fuel cycle: reprocessing. Supplement 1

    International Nuclear Information System (INIS)

    McLaren, L.H.

    1984-09-01

    This bibliography contains information on spent fuel reprocessing included in the Department of Energy's Energy Data Base from December 1982 through December 1983. The 555 citations in this bibliography are to research reports, journal articles, books, patents, theses, and conference papers from worldwide sources. Five indexes are provided: Corporate Author, Personal Author, Subject, Contract Number, and Report Number

  8. APEX nuclear fuel cycle for production of LWR fuel and elimination of radioactive waste

    International Nuclear Information System (INIS)

    Steinberg, M.; Powell, J.R.

    1981-08-01

    The development of a nuclear fission fuel cycle is proposed which eliminates all the radioactive fission product waste effluent and the need for geological-age high level waste storage and provides a long term supply of fissile fuel for an LWR power reactor economy. The fuel cycle consists of reprocessing LWR spent fuel (1 to 2 years old) to remove the stable nonradioactive (NRFP, e.g. lanthanides, etc.) and short-lived fission products SLFP e.g. half-lives of (1 to 2 years) and returning, in dilute form, the long-lived fission products, ((LLFPs, e.g. 30 y half-life Cs, Sr, and 10 y Kr, and 16 x 10 6 y I) and the transuranics (TUs, e.g. Pu, Am, Cm, and Np) to be refabricated into fresh fuel elements. Makeup fertile and fissile fuel are to be supplied through the use of a Spallator (linear accelerator spallation-target fuel-producer). The reprocessing of LWR fuel elements is to be performed by means of the Chelox process which consists of Airox treatment (air oxidation and hydrogen reduction) followed by chelation with an organic reagent (β-diketonate) and vapor distillation of the organometallic compounds for separation and partitioning of the fission products

  9. Nuclear fuel waste disposal

    International Nuclear Information System (INIS)

    Allan, C.J.

    1993-01-01

    The Canadian concept for nuclear fuel waste disposal is based on disposing of the waste in a vault excavated 500-1000 m deep in intrusive igneous rock of the Canadian Shield. The author believes that, if the concept is accepted following review by a federal environmental assessment panel (probably in 1995), then it is important that implementation should begin without delay. His reasons are listed under the following headings: Environmental leadership and reducing the burden on future generations; Fostering public confidence in nuclear energy; Forestalling inaction by default; Preserving the knowledge base. Although disposal of reprocessing waste is a possible future alternative option, it will still almost certainly include a requirement for geologic disposal

  10. The environmental impact of reprocessing

    International Nuclear Information System (INIS)

    Mummery, P.W.; Howells, H.; Scriven, A.

    1980-01-01

    The subject is discussed under the headings: introduction; basis of hazard assessment (dose limits - ICRP recommendations; biological radiation effects); comparison of standards and practice in the UK and USA in the limitation of exposure of the public as a consequence of discharges of radioactive effluent to the environment; nature of reprocessing operations (Thermal Oxide Fuel Reprocessing Plant (THORP); storage ponds; fuel shearing; leaching; clarification; solvent extraction; finishing); waste management (liquids, solids, gases); waste discharges; environmental impact of normal operations (identification of the critical groups; exposure of critical groups; risks and exposures, occupational and collective); environmental impact of accidents (risk - probability multiplied by consequence of the event; types of accident considered); conclusion. (U.K.)

  11. French experience and prospects in the reprocessing of fast breeder reactor fuels

    International Nuclear Information System (INIS)

    Megy, J.

    1983-06-01

    Experience acquired in France in the field of reprocessing spent fuels from fast breeder reactors is recalled. Emphasis is put on characteristics and quantities of spent fuels reprocessed in La Hague and Marcoule facilities. Then reprocessing developments with the realisation of the new pilot plant TOR at Marcoule, new equipments and study of industrial reprocessing units are reviewed [fr

  12. Fast reactor fuel reprocessing development in the United States: an overview

    International Nuclear Information System (INIS)

    Groenier, W.S.; Burch, W.D.

    1979-01-01

    As a result of the reduced nuclear power demand and the growing concerns over the potential proliferation of sensitive nuclear materials, there has not been a necessity to make immediate decisions regarding near-term reprocessing and breeder reactor commercialization. Programs which formed the basic thrust of nuclear development in the early 1970's have already been adjusted: increased emphasis on problems of radioactive waste management; increased attention to nonproliferation objectives and subsequent reorientation of the overall fuel cycle and breeder programs; increased emphasis on a once-through light-water reactor technology; increased concern for a more detailed knowledge of the uranium resource base; reorientation of the uranium enrichment programs; and exploration of alternative fuel cycles (such as thorium) to minimize the use of plutonium. Nevertheless, major strategic decisions still loom over breeder commercialization, the breeder's requisite demand for reprocessing, and the future role of more proliferation-resistant nuclear technologies. The current program in the United States is organized to provide the necessary technology for the reprocessing of breeder fuels on a timetable that is consistent with the reactor development and demonstration program. Also addressed in this paper are the present day concerns of environmental protection, safety, nuclear material safeguards, and proliferation resistance. It is structured on the well-known Purex processing method but includes new efforts aimed at advanced and alternative fuels. At the present time, the program consists mainly of a generic effort that is planned to progress through an integrated equipment engineering demonstration to an eventual pilot-plant operation. Each of these facilities is viewed as a test bed for advanced and alternative processing steps to address the many significant technical and political issues. 16 figures

  13. Potential health hazard of nuclear fuel waste and uranium ore

    International Nuclear Information System (INIS)

    Mehta, K.; Sherman, G.R.; King, S.G.

    1991-06-01

    The variation of the radioactivity of nuclear fuel waste (used fuel and fuel reprocessing waste) with time, and the potential health hazard (or inherent radiotoxicity) resulting from its ingestion are estimated for CANDU (Canada Deuterium Uranium) natural-uranium reactors. Four groups of radionuclides in the nuclear fuel waste are considered: actinides, fission products, activation products of zircaloy, and activation products of fuel impurities. Contributions from each of these groups to the radioactivity and to the potential health hazard are compared and discussed. The potential health hazard resulting from used fuel is then compared with that of uranium ore, mine tailings and refined uranium (fresh fuel) on the basis of equivalent amounts of uranium. The computer code HAZARD, specifically developed for these computations, is described

  14. Reprocessing free nuclear fuel production via fusion fission hybrids

    Energy Technology Data Exchange (ETDEWEB)

    Kotschenreuther, Mike, E-mail: mtk@mail.utexas.edu [Intitute for Fusion Studies, University of Texas at Austin (United States); Valanju, Prashant; Mahajan, Swadesh [Intitute for Fusion Studies, University of Texas at Austin (United States)

    2012-05-15

    Fusion fission hybrids, driven by a copious source of fusion neutrons can open qualitatively 'new' cycles for transmuting nuclear fertile material into fissile fuel. A totally reprocessing-free (ReFree) Th{sup 232}-U{sup 233} conversion fuel cycle is presented. Virgin fertile fuel rods are exposed to neutrons in the hybrid, and burned in a traditional light water reactor, without ever violating the integrity of the fuel rods. Throughout this cycle (during breeding in the hybrid, transport, as well as burning of the fissile fuel in a water reactor) the fissile fuel remains a part of a bulky, countable, ThO{sub 2} matrix in cladding, protected by the radiation field of all fission products. This highly proliferation-resistant mode of fuel production, as distinct from a reprocessing dominated path via fast breeder reactors (FBR), can bring great acceptability to the enterprise of nuclear fuel production, and insure that scarcity of naturally available U{sup 235} fuel does not throttle expansion of nuclear energy. It also provides a reprocessing free path to energy security for many countries. Ideas and innovations responsible for the creation of a high intensity neutron source are also presented.

  15. Reprocessing free nuclear fuel production via fusion fission hybrids

    International Nuclear Information System (INIS)

    Kotschenreuther, Mike; Valanju, Prashant; Mahajan, Swadesh

    2012-01-01

    Fusion fission hybrids, driven by a copious source of fusion neutrons can open qualitatively “new” cycles for transmuting nuclear fertile material into fissile fuel. A totally reprocessing-free (ReFree) Th 232 –U 233 conversion fuel cycle is presented. Virgin fertile fuel rods are exposed to neutrons in the hybrid, and burned in a traditional light water reactor, without ever violating the integrity of the fuel rods. Throughout this cycle (during breeding in the hybrid, transport, as well as burning of the fissile fuel in a water reactor) the fissile fuel remains a part of a bulky, countable, ThO 2 matrix in cladding, protected by the radiation field of all fission products. This highly proliferation-resistant mode of fuel production, as distinct from a reprocessing dominated path via fast breeder reactors (FBR), can bring great acceptability to the enterprise of nuclear fuel production, and insure that scarcity of naturally available U 235 fuel does not throttle expansion of nuclear energy. It also provides a reprocessing free path to energy security for many countries. Ideas and innovations responsible for the creation of a high intensity neutron source are also presented.

  16. Numerical simulations of waste forms from the reprocessing of nuclear fuel; Numerische Simulationen von Abfallgebinden aus der Wiederaufarbeitung von Kernbrennstoffen

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, Stephan

    2014-07-01

    The usage of fissile material for nuclear fuel causes that alongside radioactive wastes are produced. These waste materials are created during all handling or usage operations within the nuclear fuel cycle. The main source of radiotoxicity is produced during the usage of nuclear fuel within the reactor. Energy is released by neutron induced fission reactions in heavy isotopes. Parts of the created fission products have large radiotoxicities. Due to neutron capture within the nuclear fuel the radiotoxicity is furthermore increased. These waste streams from the nuclear fuel cycle must be stored in a safe way to prevent any contamination of the biosphere and any harm to the civilization or the environment. The waste packages must be treated and conditioned for the final disposal. These created packages are subject to an independent product control to ensure there acceptability for transport, interim and final storage. The independent product control is a significant component of an effective waste management system. The aim of this work is the development of a software system used for the assessment of radioactive waste packages. The software shall permit the auditor to perform scenario analysis to forecast the product properties of a certain waste stream and therefore optimize the needed inspection scope in preparation of a new campaign. The software is designed as a modular library this permits the most flexible use of the software components and a high reusability of written analysis software. The software system is used for coupling of established and well-known simulation programs used for nuclear systems. The results of Monte-Carlo simulations and burn-up calculations are automatically imported and prepared for user interaction. The usage of simulation programs cause different challenges to the computing infrastructure. The scenario analyses need a large number of parameter variations which are bound to the computing time. For this reason additional to the

  17. Fuel processing. Wastes processing

    International Nuclear Information System (INIS)

    Bourgeois, M.

    2000-01-01

    The gaseous, liquid and solid radioactive effluents generated by the fuel reprocessing, can't be release in the environment. They have to be treated in order to respect the limits of the pollution regulations. These processing are detailed and discussed in this technical paper. A second part is devoted to the SPIN research program relative to the separation of the long life radionuclides in order to reduce the radioactive wastes storage volume. (A.L.B.)

  18. Recycling of reprocessed uranium

    International Nuclear Information System (INIS)

    Randl, R.P.

    1987-01-01

    Since nuclear power was first exploited in the Federal Republic of Germany, the philosophy underlying the strategy of the nuclear fuel cycle has been to make optimum use of the resource potential of recovered uranium and plutonium within a closed fuel cycle. Apart from the weighty argument of reprocessing being an important step in the treatment and disposal of radioactive wastes, permitting their optimum ecological conditioning after the reprocessing step and subsequent storage underground, another argument that, no doubt, carried weight was the possibility of reducing the demand of power plants for natural uranium. In recent years, strategies of recycling have emerged for reprocessed uranium. If that energy potential, too, is to be exploited by thermal recycling, it is appropriate to choose a slightly different method of recycling from the one for plutonium. While the first generation of reprocessed uranium fuel recycled in the reactor cuts down natural uranium requirement by some 15%, the recycling of a second generation of reprocessed, once more enriched uranium fuel helps only to save a further three per cent of natural uranium. Uranium of the second generation already carries uranium-232 isotope, causing production disturbances, and uranium-236 isotope, causing disturbances of the neutron balance in the reactor, in such amounts as to make further fabrication of uranium fuel elements inexpedient, even after mixing with natural uranium feed. (orig./UA) [de

  19. Reduced waste arise in a reprocessing plant by the use of remote control

    International Nuclear Information System (INIS)

    Issel, W.A.

    1988-01-01

    This paper discusses how the increasing use of remote controlled processes, which is unavoidable with respect to work in hostile environment and which after serious further development and experience may improve plant production rate lead to another benefit in handling nuclear material, the benefit of reducing waste production and by this the avoidance of radioactive dispersal. The example of reprocessing of spent fuel is shown, what consequences and what improvements can be expected in the waste management by remote handling and maintenance instead of direct intervention by men

  20. Feasibility study for adapting ITREC plant to reprocessing LMFBR fuels

    International Nuclear Information System (INIS)

    Moccia, A.; Rolandi, G.

    1976-05-01

    The report evaluates the feasibility of adapting ITREC plant to the reprocessing LMFBR fuels, with the double purpose of: 1) recovering valuable Pu contained in these fuels and recycling it to the fabrication plant; 2) trying, on a pilot scale, the chemical process technology to be applied in a future industrial plant for reprocessing the fuel elements discharged from fast breeder power reactors

  1. The economics of reprocessing versus direct disposal of spent nuclear fuel

    International Nuclear Information System (INIS)

    Bunn, M.; Holdren, J.P.; Fetter, S.; Zwaan, B. van der

    2007-01-01

    The economics of reprocessing versus direct disposal of spent nuclear fuel are assessed. The break-even uranium price at which reprocessing spent nuclear fuel from existing light water reactors (LWRs) and recycling the resulting plutonium and uranium in LWRs would become economic is estimated for a wide range of reprocessing prices and other fuel cycle costs and parameters. The contribution of each fuel cycle option to the cost of electricity is also estimated. A similar analysis is performed for the breakeven uranium price at which deploying fast neutron reactors (FRs) would become competitive compared with a once-through fuel cycle in LWRs, for a range of differences in capital cost between LWRs and FRs. Available information about reprocessing prices and various other fuel cycle costs and input parameters are reviewed, as well as the quantities of uranium likely to be recoverable worldwide at a range of different possible future prices. It is concluded that the once-through fuel cycle is likely to remain significantly cheaper than reprocessing and recycling in either LWRs or FRs for at least the next 50 years. Finally, there is a discussion of how scarce and expensive repository space would have to become before separation and transmutation would be economically attractive. (author)

  2. SCFR Fuel Cycles and Their Impact on the Performance of High-Level Waste Disposal

    Energy Technology Data Exchange (ETDEWEB)

    Kawasaki, Daisuke; Nogi, Naoyuki; Saito, Takumi [Department of Nuclear Engineering and Management, Graduate School of Engineering, The University of Tokyo, 7-3-1 Hongo, Bunkyo-ku, Tokyo, 113-8656 (Japan); Nagasaki, Shinya [Nuclear Professional School, Graduate School of Engineering, The University of Tokyo, 2-22 Shirakata Shirane, Tokai, Ibaraki, 319-1188 (Japan)

    2009-06-15

    The concept of supercritical-pressure light water cooled fast reactor (SCFR) is developed and studied at the University of Tokyo. The impact of disposal of the waste generated in a fuel cycle with SCFR is also investigated in the project. It is of great interest how a fuel cycle with SCFR compares to the other fuel cycles from the back-end view point. With its various neutron spectrum, SCFR may be used to transmute both actinides and fission products. The objective of the present study is to evaluate and compare multiple fuel cycle designs in order to investigate the effects of SCFR and its transmutation capability upon the back-end risks. Three designs of fuel cycle are considered for evaluation in the present study. First, a simple fuel cycle with PWR and recycling is considered. The spent fuel from the PWR is reprocessed to recover uranium and plutonium, and the rest of the radioactive nuclides are vitrified and disposed of in a geologic repository. In the second design, the recovered uranium and plutonium in the reprocessing of PWR spent fuel is fabricated into a MOX fuel and irradiated in SCFR. The spent fuel from the SCFR is reprocessed to recover uranium and plutonium. In the third design, actinide elements are also separated from the PWR spent fuel and is loaded as the blanket fuel in SCFR core together with the MOX fuel fabricated from the recovered uranium and plutonium. In the same way as in the second design, the spent fuel from the SCFR is reprocessed to recover uranium and plutonium. In the second and the third designs, there are two streams of highly radioactive waste; one from the reprocessing (separation process) of the PWR spent fuel, and the other from the reprocessing of the SCFR spent fuel. Numerical codes Origen2.1 and SWAT is used for fuel irradiation calculation. The performance of the high-level radioactive waste repository is evaluated for each design of fuel cycle. It is assumed that the repository is located in a water-saturated geologic

  3. Benefit analysis of reprocessing and recycling light water reactor fuel

    International Nuclear Information System (INIS)

    1976-12-01

    The macro-economic impact of reprocessing and recycling fuel for nuclear power reactors is examined, and the impact of reprocessing on the conservation of natural uranium resources is assessed. The LWR fuel recycle is compared with a throwaway cycle, and it is concluded that fuel recycle is favorable on the basis of economics, as well as being highly desirable from the standpoint of utilization of uranium resources

  4. First annual report of the Canadian nuclear fuel waste management program

    International Nuclear Information System (INIS)

    Boulton, J.; Gibson, A.R.

    1979-12-01

    The research and development program for the safe, permanent disposal of Canada's nuclear fuel wastes has been established. This report, the first of a series of annual reports, reviews in general terms the progress which has been achieved. After briefly reviewing the rationale and organization of the program, the report summarizes activities in the area of public information, used fuel storage and transportation, immobilization of used fuel and fuel reprocessing wastes, research and development associated with deep underground disposal, and environmental and safety assessment. (auth) [fr

  5. Waste management in IFR [Integral Fast Reactor] fuel cycle

    International Nuclear Information System (INIS)

    Johnson, T.R.; Battles, J.E.

    1991-01-01

    The fuel cycle of the Integral Fast Reactor (IFR) has important potential advantage for the management of high-level wastes. This sodium-cooled, fast reactor will use metal fuels that are reprocessed by pyrochemical methods to recover uranium, plutonium, and the minor actinides from spent core and blanket fuel. More than 99% of all transuranic (TRU) elements will be recovered and returned to the reactor, where they are efficiently burned. The pyrochemical processes being developed to treat the high-level process wastes are capable of producing waste forms with low TRU contents, which should be easier to dispose of. However, the IFR waste forms present new licensing issues because they will contain chloride salts and metal alloys rather than glass or ceramic. These fuel processing and waste treatment methods can also handle TRU-rich materials recovered from light-water reactors and offer the possibility of efficiently and productively consuming these fuel materials in future power reactors

  6. Operation of Nuclear Fuel Based on Reprocessed Uranium for VVER-type Reactors in Competitive Nuclear Fuel Cycles

    Energy Technology Data Exchange (ETDEWEB)

    Troyanov, V.; Molchanov, V.; Tuzov, A. [TVEL Corporation, 49 Kashirskoe shosse, Moscow 115409 (Russian Federation); Semchenkov, Yu.; Lizorkin, M. [RRC ' Kurchatov Institute' (Russian Federation); Vasilchenko, I.; Lushin, V. [OKB ' Gidropress' (Russian Federation)

    2009-06-15

    Current nuclear fuel cycle of Russian nuclear power involves reprocessed low-enriched uranium in nuclear fuel production for some NPP units with VVER-type LWR. This paper discusses design and performance characteristics of commercial nuclear fuel based on natural and reprocessed uranium. It presents the review of results of commercial operation of nuclear fuel based on reprocessed uranium on Russian NPPs-unit No.2 of Kola NPP and unit No.2 of Kalinin NPP. The results of calculation and experimental validation of safe fuel operation including necessary isotope composition conformed to regulation requirements and results of pilot fuel operation are also considered. Meeting the customer requirements the possibility of high burn-up achieving was demonstrated. In addition the paper compares the characteristics of nuclear fuel cycles with maximum length based on reprocessed and natural uranium considering relevant 5% enrichment limitation and necessity of {sup 236}U compensation. The expedience of uranium-235 enrichment increasing over 5% is discussed with the aim to implement longer fuel cycles. (authors)

  7. Safety aspects of LWR fuel reprocessing and mixed oxide fuel fabrication plants

    International Nuclear Information System (INIS)

    Fischer, M.; Leichsenring, C.H.; Herrmann, G.W.; Schueller, W.; Hagenberg, W.; Stoll, W.

    1977-01-01

    The paper is focused on the safety and the control of the consequences of credible accidents in LWR fuel reprocessing plants and in mixed oxide fuel fabrication plants. Each of these plants serve for many power reactor (about 50.000 Mwel) thus the contribution to the overall risk of nuclear energy is correspondingly low. Because of basic functional differences between reprocessing plants, fuel fabrication plants and nuclear power reactors, the structure and safety systems of these plants are different in many respects. The most important differences that influence safety systems are: (1) Both fuel reprocessing and fabrication plants do not have the high system pressure that is associated with power reactors. (2) A considerable amount of the radioactivity of the fuel, which is in the form of short-lived radionuclides has decayed. Therefore, fuel reprocessing plants and mixed oxide fuel fabrication plants are designed with multiple confinement barriers for control of radioactive materials, but do not require the high-pressure containment systems that are used in LWR plants. The consequences of accidents which may lead to the dispersion of radioactive materials such as chemical explosions, nuclear excursions, fires and failure of cooling systems are considered. A reasonable high reliability of the multiple confinement approach can be assured by design. In fuel reprocessing plants, forced cooling is necessary only in systems where fission products are accumulated. However, the control of radioactive materials can be maintained during normal operation and during the above mentioned accidents, if the dissolver off-gas and vessel off-gas treatment systems provide for effective removal of radioactive iodine, radioactive particulates, nitrogen oxides, tritium and krypton 85. In addition, the following incidents in the dissolver off-gas system itself must be controlled: failures of iodine filters, hydrogen explosion in O 2 - and NOsub(x)-reduction component, decomposition of

  8. Analysis of the Reuse of Uranium Recovered from the Reprocessing of Commercial LWR Spent Fuel

    International Nuclear Information System (INIS)

    DelCul, Guillermo D.; Trowbridge, Lee D.; Renier, John-Paul; Ellis, Ronald James; Williams, Kent Alan; Spencer, Barry B.; Collins, Emory D.

    2009-01-01

    This report provides an analysis of the factors involved in the reuse of uranium recovered from commercial light-water-reactor (LWR) spent fuels (1) by reenrichment and recycling as fuel to LWRs and/or (2) by recycling directly as fuel to heavy-water-reactors (HWRs), such as the CANDU (registered trade name for the Canadian Deuterium Uranium Reactor). Reuse is an attractive alternative to the current Advanced Fuel Cycle Initiative (AFCI) Global Nuclear Energy Partnership (GNEP) baseline plan, which stores the reprocessed uranium (RU) for an uncertain future or attempts to dispose of it as 'greater-than-Class C' waste. Considering that the open fuel cycle currently deployed in the United States already creates a huge excess quantity of depleted uranium, the closed fuel cycle should enable the recycle of the major components of spent fuel, such as the uranium and the hazardous, long-lived transuranic (TRU) actinides, as well as the managed disposal of fission product wastes. Compared with the GNEP baseline scenario, the reuse of RU in the uranium fuel cycle has a number of potential advantages: (1) avoidance of purchase costs of 11-20% of the natural uranium feed; (2) avoidance of disposal costs for a large majority of the volume of spent fuel that is reprocessed; (3) avoidance of disposal costs for a portion of the depleted uranium from the enrichment step; (4) depending on the 235 U assay of the RU, possible avoidance of separative work costs; and (5) a significant increase in the production of 238 Pu due to the presence of 236 U, which benefits somewhat the transmutation value of the plutonium and also provides some proliferation resistance

  9. Management of reprocessed uranium. Current status and future prospects

    International Nuclear Information System (INIS)

    2007-02-01

    There is worldwide interest in developing advanced and innovative technologies for nuclear fuel cycles, minimizing waste and environmental impacts. As of the beginning of 2003, about 171000 tonnes heavy metal spent nuclear fuel is in storage, while smaller amounts have been reprocessed. In several countries, including France, India, Japan and the Russian Federation, spent fuel has been viewed as a national energy resource. Some countries hold reprocessed uranium as the result of their commercial reprocessing service contracts for reprocessing the spent fuel of others. Reprocessed uranium has a potential value for recycling either directly or after appropriate treatment. This report analyses the existing options, approaches and developments in the management of reprocessed uranium. It includes the technical issues involved in managing reprocessed uranium which are RepU arisings, storage, chemical conversion, re-enrichment, fuel fabrication, transport, reactor irradiation, subsequent reprocessing and disposal options, as well as assessment of holistic environmental impacts. The objective of this document is to overview the information on the current status and future trends in the management of RepU and to identify major issues to be considered for future projects

  10. Pyro-electrochemical reprocessing of irradiated MOX fast reactor fuel, testing of the reprocessing process with direct MOX fuel production

    Energy Technology Data Exchange (ETDEWEB)

    Kormilitzyn, M.V.; Vavilov, S.K.; Bychkov, A.V.; Skiba, O.V.; Chistyakov, V.M.; Tselichshev, I.V

    2000-07-01

    One of the advanced technologies for fast reactor fuel recycle is pyro-electrochemical molten salt technology. In 1998 we began to study the next phase of the irradiated oxide fuel reprocessing new process MOX {yields} MOX. This process involves the following steps: - Dissolution of irradiated fuel in molten alkaline metal chlorides, - Purification of melt from fission products that are co-deposited with uranium and plutonium oxides, - Electrochemical co-deposition of uranium and plutonium oxides under the controlled cathode potential, - Production of granulated MOX (crushing,salt separation and sizing), and - Purification of melt from fission products by phosphate precipitation. In 1998 a series of experiments were prepared and carried out in order to validate this process. It was shown that the proposed reprocessing flowsheet of irradiated MOX fuel verified the feasibility of its decontamination from most of its fission products (rare earths, cesium) and minor-actinides (americium, curium)

  11. Pyro-electrochemical reprocessing of irradiated MOX fast reactor fuel, testing of the reprocessing process with direct MOX fuel production

    International Nuclear Information System (INIS)

    Kormilitzyn, M.V.; Vavilov, S.K.; Bychkov, A.V.; Skiba, O.V.; Chistyakov, V.M.; Tselichshev, I.V.

    2000-01-01

    One of the advanced technologies for fast reactor fuel recycle is pyro-electrochemical molten salt technology. In 1998 we began to study the next phase of the irradiated oxide fuel reprocessing new process MOX → MOX. This process involves the following steps: - Dissolution of irradiated fuel in molten alkaline metal chlorides, - Purification of melt from fission products that are co-deposited with uranium and plutonium oxides, - Electrochemical co-deposition of uranium and plutonium oxides under the controlled cathode potential, - Production of granulated MOX (crushing,salt separation and sizing), and - Purification of melt from fission products by phosphate precipitation. In 1998 a series of experiments were prepared and carried out in order to validate this process. It was shown that the proposed reprocessing flowsheet of irradiated MOX fuel verified the feasibility of its decontamination from most of its fission products (rare earths, cesium) and minor-actinides (americium, curium)

  12. An overview on dry reprocessing of irradiated nuclear fuels

    International Nuclear Information System (INIS)

    Ouyang Yinggen

    2002-01-01

    Although spent nuclear fuels have been reprocessed successfully for many years by the well-know Purex process based on solvent extraction, other reprocessing method which do not depend upon the use of organic solvents and aqueous media appear to have important potential advantage. There are two main non-aqueous methods for the reprocessing of spent fuel: fluoride-volatility process and pyro-electrochemical process. The presence of a poser in the process is that PuF 6 is obviously thermodynamically stable only in the presence of a large excess of fluorine. Pyro-electrochemical process is suited to processing metallic, oxide and carbide fuels. First, the fuel is dissolved in fresh salts, then, electrodes are introduced into the bath, U and Pu are deposited on the cathode, third, separation and refinement U and Pu are deposited on the cathode. There is a couple of contradictions in the process that are not in harmonious proportion in the fields on the nuclear fuel is dissolved the ability in the molten salt and corrosiveness of the molten salt for equipment used in the process

  13. A Non-Proliferating Fuel Cycle: No Enrichment, Reprocessing or Accessible Spent Fuel - 12375

    Energy Technology Data Exchange (ETDEWEB)

    Parker, Frank L. [Vanderbilt University (United States)

    2012-07-01

    Current fuel cycles offer a number of opportunities for access to plutonium, opportunities to create highly enriched uranium and access highly radioactive wastes to create nuclear weapons and 'dirty' bombs. The non-proliferating fuel cycle however eliminates or reduces such opportunities and access by eliminating the mining, milling and enrichment of uranium. The non-proliferating fuel cycle also reduces the production of plutonium per unit of energy created, eliminates reprocessing and the separation of plutonium from the spent fuel and the creation of a stream of high-level waste. It further simplifies the search for land based deep geologic repositories and interim storage sites for spent fuel in the USA by disposing of the spent fuel in deep sub-seabed sediments after storing the spent fuel at U.S. Navy Nuclear Shipyards that have the space and all of the necessary equipment and security already in place. The non-proliferating fuel cycle also reduces transportation risks by utilizing barges for the collection of spent fuel and transport to the Navy shipyards and specially designed ships to take the spent fuel to designated disposal sites at sea and to dispose of them there in deep sub-seabed sediments. Disposal in the sub-seabed sediments practically eliminates human intrusion. Potential disposal sites include Great Meteor East and Southern Nares Abyssal Plain. Such sites then could easily become international disposal sites since they occur in the open ocean. It also reduces the level of human exposure in case of failure because of the large physical and chemical dilution and the elimination of a major pathway to man-seawater is not potable. Of course, the recovery of uranium from sea water and the disposal of spent fuel in sub-seabed sediments must be proven on an industrial scale. All other technologies are already operating on an industrial scale. If externalities, such as reduced terrorist threats, environmental damage (including embedded

  14. Consolidated fuel reprocessing. Program progress report, April 1-June 30, 1980

    Energy Technology Data Exchange (ETDEWEB)

    1980-09-01

    This progress report is compiled from major contributions from three programs: (1) the Advanced Fuel Recycle Program at ORNL; (2) the Converter Fuel Reprocessing Program at Savannah River Laboratory; and (3) the reprocessing components of the HTGR Fuel Recycle Program, primarily at General Atomic and ORNL. The coverage is generally overview in nature; experimental details and data are limited.

  15. Melt processed crystalline ceramic waste forms for advanced nuclear fuel cycles: CRP T21027 1813: Processing technologies for high level waste, formulation of matrices and characterization of waste forms, Task 17208: Final report

    Energy Technology Data Exchange (ETDEWEB)

    Amoroso, J. W. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Marra, J. C. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-08-26

    A multi-phase ceramic waste form is being developed at the Savannah River National Laboratory (SRNL) for treatment of secondary waste streams generated by reprocessing commercial spent nuclear. The envisioned waste stream contains a mixture of transition, alkali, alkaline earth, and lanthanide metals. Ceramic waste forms are tailored (engineered) to incorporate waste components as part of their crystal structure based on knowledge from naturally found minerals containing radioactive and non-radioactive species similar to the radionuclides of concern in wastes from fuel reprocessing. The ability to tailor ceramics to mimic naturally occurring crystals substantiates the long term stability of such crystals (ceramics) over geologic timescales of interest for nuclear waste immobilization [1]. A durable multi-phase ceramic waste form tailored to incorporate all the waste components has the potential to broaden the available disposal options and thus minimize the storage and disposal costs associated with aqueous reprocessing. This report summarizes results from three years of work on the IAEA Coordinated Research Project on “Processing technologies for high level waste, formulation of matrices and characterization of waste forms” (T21027), and specific task “Melt Processed Crystalline Ceramic Waste Forms for Advanced Nuclear Fuel Cycles” (17208).

  16. Melt processed crystalline ceramic waste forms for advanced nuclear fuel cycles: CRP T21027 1813: Processing technologies for high level waste, formulation of matrices and characterization of waste forms, task 17208: Final report

    Energy Technology Data Exchange (ETDEWEB)

    Amoroso, J. W. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Marra, J. C. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-08-26

    A multi-phase ceramic waste form is being developed at the Savannah River National Laboratory (SRNL) for treatment of secondary waste streams generated by reprocessing commercial spent nuclear. The envisioned waste stream contains a mixture of transition, alkali, alkaline earth, and lanthanide metals. Ceramic waste forms are tailored (engineered) to incorporate waste components as part of their crystal structure based on knowledge from naturally found minerals containing radioactive and non-radioactive species similar to the radionuclides of concern in wastes from fuel reprocessing. The ability to tailor ceramics to mimic naturally occurring crystals substantiates the long term stability of such crystals (ceramics) over geologic timescales of interest for nuclear waste immobilization [1]. A durable multi-phase ceramic waste form tailored to incorporate all the waste components has the potential to broaden the available disposal options and thus minimize the storage and disposal costs associated with aqueous reprocessing. This report summarizes results from three years of work on the IAEA Coordinated Research Project on “Processing technologies for high level waste, formulation of matrices and characterization of waste forms” (T21027), and specific task “Melt Processed Crystalline Ceramic Waste Forms for Advanced Nuclear Fuel Cycles” (17208).

  17. Personnel exposure estimates associated with nuclear fuel reprocessing waste

    International Nuclear Information System (INIS)

    Boone, F.W.; Rogers, B.W.

    1983-08-01

    The operation design of the Barnwell Nuclear Fuel Plant (BNFP) calls for shipment of its wastes to either a low-level waste disposal site or to a Federal repository. This study analyzes the probable radiation dose accrued to the personnel involved in handling waste packages from all identified waste streams of the BNFP from generation to reception at destination and including transportation. The shielding characteristics of the transport packages were derived by assuming packaging in existing or prototyped casks. Possible combinations of waste forms and packages for which the projected dose exceeded DOT or NRC regulations for transport of radioactive materials were rejected. Legal weight truck and legal weight rail transport modes were assumed. Potential ways for reducing overall personnel exposure are considered, concentrating on the particular streams with the largest dose contributions. The personnel exposure estimates were determined using a computer program specifically designed for this purpose. This program is described in Appendix A. 9 references, 3 figures, 19 tables

  18. Analysis by simulation of the disposition of nuclear-fuel waste

    International Nuclear Information System (INIS)

    Turek, J.L.

    1980-09-01

    To achieve the non-proliferation objectives of the United States, the reprocessing of spent nuclear fuel was discontinued in 1977. Since current at-reactor storage capacity is based upon a nuclear fuel cycle which includes reprocessing, this halt in reprocessing is causing large quantities of non-storable spent fuel. Permanent nuclear waste storage repositories will not be available until the end of the century. Present Department of Energy policy calls for sufficient interim Away-From-Reactor (AFR) Storage capacity to insure that no commercial reactor has to shutdown due to inadequate storage space for discharged spent fuel. A descriptive simulation model is developed which includes all aspects of nuclear waste disposition. The model is comprised of two systems, the second system orchestrated by GASP IV. A spent fuel generation prediction module is interfaced with the AFR Program Management Information System and a repository scheduling information module. The user is permitted a wide range of options with which to tailor the simulation to any desired storage scenario. The model projects storage requirements through the year 2020. The outputs are evaluations of the impact that alternative decision policies and milestone date changes have on the demand for, the availability of, and the utilization of spent fuel storage capacities. Both graphs and detailed listings are available. These outputs give a comprehensive view of the particular scenario under observation, including the tracking, by year, of each discharge from every reactor. Included within the work is a review of the status of spent fuel disposition based on input data accurate as of August 1980

  19. Legal problems of nuclear fuel reprocessing

    International Nuclear Information System (INIS)

    Rossnagel, A.

    1987-01-01

    The contributions in this book are intended to exemplify the legal situation in connection with the reprocessing of spent nuclear fuel from the point of view of constitutional law, administrative law, and international law. Outline solutions are presented with regard to ensuring health, personal freedom, democratic rights and other rights, and are discussed. The author Rossnagel investigates whether the principle of essential matter can guarantee a parliamentary prerogative concerning this field of large-scale technology. The author Schmidt shows that there is no legal obligation of commitment to a reprocessing technology that would exclude research for or application of a less hazardous technology. The contribution by Baumann explains the problems presented by a technology not yet developed to maturity with regard to the outline approval of the technological concept, which is a prerequisite of any partial licence to be issued. The final contribution by Guendling investigates the duties under international law, as for instance transfrontier information, consultation, and legal protection, and how these duties can be better put into practice in order to comply the seriousness of the hazards involved in nuclear fuel reprocessing. (orig./HP) [de

  20. Reprocessing of nuclear fuels: economical, ecological and technical aspects

    International Nuclear Information System (INIS)

    Kueffer, K.

    1994-01-01

    The report deals with the questions on reprocessing and final storage of spent fuel elements from the point of view of the Swiss. The contractual obligations were discussed, of the present situation of reprocessing and their assessment. 1 fig

  1. Correlation of radioactive waste treatment costs and the environmental impact of waste effluents in the nuclear fuel cycle for use in establishing ''as low as practicable'' guides: nuclear fuel reprocessing

    International Nuclear Information System (INIS)

    Finney, B.C.; Blanco, R.E.; Dahlman, R.C.; Kitts, F.G.; Witherspoon, J.P.

    1975-05-01

    A cost-benefit study was made to determine the cost and effectiveness of radioactive waste (radwaste) treatment systems for decreasing the release of radioactive materials from a model nuclear fuel reprocessing plant which processes light-water reactor (LWR) fuels, and to determine the radiological impact (dose commitment) of the released materials on the environment. The study is designed to assist in defining the term ''as low as practicable'' in relation to limiting the release of radioactive materials from nuclear facilities. The base case model plant is representative of current plant technology and has an annual capacity of 1500 metric tons of LWR fuel. Additional radwaste treatment systems are added to the base case plant in a series of case studies to decrease the amounts of radioactive materials released and to reduce the radiological dose commitment to the population in the surrounding area. The cost for the added waste treatment operations and the corresponding dose commitments are calculated for each case. In the final analysis, radiological dose is plotted vs the annual cost for treatment of the radwastes. The status of the radwaste treatment methods used in the case studies is discussed. Much of the technology used in the advanced cases is in an early stage of development and is not suitable for immediate use. The methodology used in estimating the costs and the radiological doses, detailed calculations, and tabulations is presented in Appendix A and ORNL-4992. (U.S.)

  2. Environmental evaluation of reprocessing

    International Nuclear Information System (INIS)

    1979-01-01

    This paper addresses two specific points. (a) The means by which it is established that reprocessing is carried out within the basic standards for radiological protection set by the ICRP. (b) A summary of the products, wastes and effluents of reprocessing together with the energy and water resources required. It is concluded that reprocessing of spent thermal reactor fuel can be undertaken whilst conforming to the basic standards set by ICRP. For domestic reasons of public acceptability some countries adopt very strict limits. Any attempt at comparisons between limits set by individual countries could lead to misunderstandings if account is not taken of these additional factors which may in turn influence the cost of reprocessing

  3. From the reactor to waste disposal: the back-end of the nuclear fuel cycle

    International Nuclear Information System (INIS)

    Madic, C.

    1988-05-01

    The oxide fuels discharged from LWRs represent the bulk of spent fuels to be managed. For a 1 GWe LWR about 27 tonnes of spent fuels are discharged each year. This makes the total amount of spent LWR oxide fuels discharged worldwide in 1986 close to 4500 tonnes. For France, 750 tonnes of spent oxide fuels were discharged in 1986. Three alternatives are available: final disposal, interim storage, and reprocessing. This paper focusses on reprocessing option. The reprocessing is based on the PUREX Process comprising: 1/ fuel dissolution in nitric acid after shearing the fuel assembly, 2/ separation of uranium and plutonium by TBP extraction. After purification, the major actinides can be reused. A wide gap exists today between the amount of fuels discharged from LWRs and the reprocessing capacities. France has the broadest experience in reprocessing commercial LWR oxide fuels, with more than 2200 tonnes already reprocessed at La Hague. This plant will have a total reprocessing capacity of 1600 t/y in the early nineties. The minor actinides present in the spent fuels, neptunium, americium and curium, will be packaged with the fission products in glass blocks. For a 1 Gwe LWR, about 3.5 m 3 of vitrified HAW and 83 m 3 of MAW will be produced each year. All the wastes produced during reprocessing operations with an alpha activity > 0.1 Ci/t will be stored in deep geological repositories in the future. Studies are underway to determine the ideal geological sites. The solution to this problem is undoubtedly a key to the progress in the production of nuclear electricity

  4. Evaluation of subcritical hybrid systems loaded with reprocessed fuel

    International Nuclear Information System (INIS)

    Velasquez, Carlos E.; Barros, Graiciany de P.; Pereira, Claubia; Veloso, Maria Auxiliadora F.; Costa, Antonella L.

    2015-01-01

    Highlights: • Accelerator driven systems (ADS) and fusion–fission systems are investigated for transmutation and fuel regeneration. • The calculations were performed using Monteburns code. • The results indicate the most suitable system for achieve transmutation. - Abstract: Two subcritical hybrid systems containing spent fuel reprocessed by Ganex technique and spiked with thorium were submitted to neutron irradiation of two different sources: ADS (Accelerator-driven subcritical) and Fusion. The aim is to investigate the nuclear fuel evolution using reprocessed fuel and the neutronic parameters under neutron irradiation. The source multiplication factor and fuel depletion for both systems were analysed during 10 years. The simulations were performed using MONTEBURNS code (MCNP/ORIGEN). The results indicate the main differences when irradiating the fuel with different neutron sources as well as the most suitable system for achieving transmutation

  5. High-level waste processing and disposal

    International Nuclear Information System (INIS)

    Crandall, J.L.; Krause, H.; Sombret, C.; Uematsu, K.

    1984-11-01

    Without reprocessing, spent LWR fuel itself is generally considered an acceptable waste form. With reprocessing, borosilicate glass canisters, have now gained general acceptance for waste immobilization. The current first choice for disposal is emplacement in an engineered structure in a mined cavern at a depth of 500-1000 meters. A variety of rock types are being investigated including basalt, clay, granite, salt, shale, and volcanic tuff. This paper gives specific coverage to the national high level waste disposal plans for France, the Federal Republic of Germany, Japan and the United States. The French nuclear program assumes prompt reprocessing of its spent fuels, and France has already constructed the AVM. Two larger borosilicate glass plants are planned for a new French reprocessing plant at La Hague. France plans to hold the glass canisters in near-surface storage for a forty to sixty year cooling period and then to place them into a mined repository. The FRG and Japan also plan reprocessing for their LWR fuels. Both are currently having some fuel reprocessed by France, but both are also planning reprocessing plants which will include waste vitrification facilities. West Germany is now constructing the PAMELA Plant at Mol, Belgium to vitrify high level reprocessing wastes at the shutdown Eurochemic Plant. Japan is now operating a vitrification mockup test facility and plans a pilot plant facility at the Tokai reprocessing plant by 1990. Both countries have active geologic repository programs. The United State program assumes little LWR fuel reprocessing and is thus primarily aimed at direct disposal of spent fuel into mined repositories. However, the US have two borosilicate glass plants under construction to vitrify existing reprocessing wastes

  6. Process behavior and environmental assessment of 14C releases from an HTGR fuel reprocessing facility

    International Nuclear Information System (INIS)

    Snider, J.W.; Kaye, S.V.

    1976-01-01

    Large quantities of 14 CO 2 will be evolved when graphite fuel blocks are burned during reprocessing of spent fuel from HTGR reactors. The possible release of some or all of this 14 C to the environment is a matter of concern which is investigated in this paper. Various alternatives are considered in this study for decontaminating and releasing the process off-gas to the environment. Concomitant radiological analyses have been done for the waste process scenarios to supply the necessary feedbacks for process design

  7. Leaching studies of natural and synthetic titanite, a potential host for wastes from the reprocessing of Canadian nuclear fuel

    International Nuclear Information System (INIS)

    Hayward, P.J.; Doern, F.E.; Cecchetto, E.V.; Mitchell, S.L.

    1983-01-01

    Glass ceramics (i.e., glasses subjected to controlled crystallization) with synthetic titanite as the major crystalline phase are being considered as potential hosts for the radioactive wastes arising from possible future reprocessing of nuclear fuel in Canada. In order to assess the stability of titanite in the anticipated environment of a disposal vault sited 500-1000 m deep within a granitic pluton in the Canadian Shield, leaching experiments have been performed with natural and synthetic titanite, using a synthetic groundwater whose composition is based on findings from a recent borehole-survey. The results are in qualitative agreement with calculations of solution equilibria for titanite and its main alteration products, and indicate that titanite should be stable and suffer no net leaching under anticipated conditions in the vault

  8. Evironmental assessment factors relating to reprocessing of spent nuclear fuel

    International Nuclear Information System (INIS)

    1978-05-01

    This document is in two parts. Part I presents the criteria and evaluation factors, based primarily on US experience, which may be used to carry out an environmental assessment of spent fuel reprocessing. The concept of As Low as is Reasonably Achievable (ALARA) is introduced in limiting radiation exposure. The factors influencing both occupational and general public radiation exposure are reviewed. Part II provides information on occupational and general public radiation exposure in relation to reprocessing taken from various sources including UNSCEAR and GESMO. Some information is provided in relation to potential accidents at reprocessing or MOX fuel refabrication plants. The magnitude of the services, energy, land use and non-radiological effluents for the reference design of reprocessing plant are also presented

  9. Advanced fuel cycle on the basis of pyroelectrochemical process for irradiated fuel reprocessing and vibropacking technology

    International Nuclear Information System (INIS)

    Mayorshin, A.A.; Skiba, O.V.; Tsykanov, V.A.; Golovanov, V.N.; Bychkov, A.V.; Kisly, V.A.; Bobrov, D.A.

    2000-01-01

    For advanced nuclear fuel cycle in SSC RIAR there is developed the pyroelectrochemical process to reprocess irradiated fuel and produce granulated oxide fuel UO 2 , PuO 2 or (U,Pu)O 2 from chloride melts. The basic technological stage is the extraction of oxides as a crystal product with the methods either of the electrolysis (UO 2 and UO 2 -PuO 2 ) or of the precipitating crystalIization (PuO 2 ). After treating the granulated fuel is ready for direct use to manufacture vibropacking fuel pins. Electrochemical model for (U,Pu)O 2 coprecipitation is described. There are new processes being developed: electroprecipitation of mixed oxides - (U,Np)O 2 , (U,Pu,Np)O 2 , (U,Am)O 2 and (U,Pu,Am)O 2 . Pyroelectrochemical production of mixed actinide oxides is used both for reprocessing spent fuel and for producing actinide fuel. Both the efficiency of pyroelectrochemical methods application for reprocessing nuclear fuel and of vibropac technology for plutonium recovery are estimated. (author)

  10. Analysis of the Reuse of Uranium Recovered from the Reprocessing of Commercial LWR Spent Fuel

    Energy Technology Data Exchange (ETDEWEB)

    DelCul, Guillermo Daniel [ORNL; Trowbridge, Lee D [ORNL; Renier, John-Paul [ORNL; Ellis, Ronald James [ORNL; Williams, Kent Alan [ORNL; Spencer, Barry B [ORNL; Collins, Emory D [ORNL

    2009-02-01

    This report provides an analysis of the factors involved in the reuse of uranium recovered from commercial light-water-reactor (LWR) spent fuels (1) by reenrichment and recycling as fuel to LWRs and/or (2) by recycling directly as fuel to heavy-water-reactors (HWRs), such as the CANDU (registered trade name for the Canadian Deuterium Uranium Reactor). Reuse is an attractive alternative to the current Advanced Fuel Cycle Initiative (AFCI) Global Nuclear Energy Partnership (GNEP) baseline plan, which stores the reprocessed uranium (RU) for an uncertain future or attempts to dispose of it as 'greater-than-Class C' waste. Considering that the open fuel cycle currently deployed in the United States already creates a huge excess quantity of depleted uranium, the closed fuel cycle should enable the recycle of the major components of spent fuel, such as the uranium and the hazardous, long-lived transuranic (TRU) actinides, as well as the managed disposal of fission product wastes. Compared with the GNEP baseline scenario, the reuse of RU in the uranium fuel cycle has a number of potential advantages: (1) avoidance of purchase costs of 11-20% of the natural uranium feed; (2) avoidance of disposal costs for a large majority of the volume of spent fuel that is reprocessed; (3) avoidance of disposal costs for a portion of the depleted uranium from the enrichment step; (4) depending on the {sup 235}U assay of the RU, possible avoidance of separative work costs; and (5) a significant increase in the production of {sup 238}Pu due to the presence of {sup 236}U, which benefits somewhat the transmutation value of the plutonium and also provides some proliferation resistance.

  11. EdF speaks about economic advantages of fuel reprocessing as compared with interim storage

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    The French company Electricite de France (EdF) will prefer nuclear fuel reprocessing and plutonium recycling to spent fuel storage also in the years after 2000. This option is economically advantageous if the proportional cost of reprocessing does not exceed 1900 FRF/kg heavy metal. Economic analysis shows that this is feasible. EdF will soon have to reprocess annually about 1000 Mt spent fuel to supply enough plutonium for MOX fuel fabrication to feed as many as 28 PWR units and the Superphenix reactor. Spent fuel reprocessing is seen as promising as long as the efficiency of the MOX fuel approaches that of natural uranium based fuel. The French national industrial, political and legal context of EdF operations is also considered. (P.A.)

  12. Fuel cycle and waste newsletter, Vol. 4, No. 1, April 2008

    International Nuclear Information System (INIS)

    2008-04-01

    This issue of the Fuel Cycle and Waste Newsletter presents the International Decommissioning Network, the cooperation between INPRO (the International Project on Innovative Nuclear Reactors and Fuel Cycles) and NEFW (IAEA's Division of Nuclear Fuel Cycle and Waste Technology), the policies and strategies for spent fuel and radioactive waste management, recent developments of decommissioning waste, integrated approach to decommissioning and environmental remediation, CEG Workshop, repatriation of sealed sources in Latin America, the technical working Group on research reactors (TWGRR), an update on research reactor networks, Atominstitut Vienna, modernization and refurbishment of research reactors, a new CRP on innovative methods in research reactor analysis, management of damaged spent nuclear fuel, influence of high-burnup UOX and MOX water reactor fuel on spent fuel management, a new CRP on improvement in the computer code modelling of high burnup nuclear fuel (FUMEX-3), reuse options for reprocessed uranium (RepU), a basic fact-book on coated particle fuel, recent publications and upcoming meetings

  13. The main chemical safety problems in main process of nuclear fuel reprocessing plant

    International Nuclear Information System (INIS)

    Song Fengli; Zhao Shangui; Liu Xinhua; Zhang Chunlong; Lu Dan; Liu Yuntao; Yang Xiaowei; Wang Shijun

    2014-01-01

    There are many chemical reactions in the aqueous process of nuclear fuel reprocessing. The reaction conditions and the products are different so that the chemical safety problems are different. In the paper the chemical reactions in the aqueous process of nuclear fuel reprocessing are described and the main chemical safety problems are analyzed. The reference is offered to the design and accident analysis of the nuclear fuel reprocessing plant. (authors)

  14. Potential safety-related incidents with possible applicability to a nuclear fuel reprocessing plant

    International Nuclear Information System (INIS)

    Perkins, W.C.; Durant, W.S.; Dexter, A.H.

    1980-12-01

    The occurrence of certain potential events in nuclear fuel reprocessing plants could lead to significant consequences involving risk to operating personnel or to the general public. This document is a compilation of such potential initiating events in nuclear fuel reprocessing plants. Possible general incidents and incidents specific to key operations in fuel reprocessing are considered, including possible causes, consequences, and safety features designed to prevent, detect, or mitigate such incidents

  15. Reprocessing of spent nuclear fuel

    International Nuclear Information System (INIS)

    Gal, I.

    1964-12-01

    This volume contains the following reports: Experimental facility for testing and development of pulsed columns and auxiliary devices; Chemical-technology study of the modified 'Purex' process; Chemical and radiometric control analyses; Chromatographic separation of rare earth elements on paper treated by di-n butylphosphate; Preliminary study of some organic nitrogen extracts significant in fuel reprocessing

  16. Report of third regular inspection of Tokai reprocessing facilities, Power Reactor and Nuclear Fuel Development Corp

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    The reprocessing facilities passed the inspection before use on December 25, 1980, and started the full operation. Since then, this is the third regular inspection. It was begun on April 1, 1986, and finished on August 18, 1986, with the inspection of the rate of recovery of products. The reprocessing facilities which became the object of inspection were the facilities for accepting and storing spent fuel, the reprocessing facilities proper (the facilities of shearing, dissolution, separation, refining, denitration and recovery of acid and solvent), the facilities for storing products, measurement and control system, radioactive waste facilities, radiation control facilities and attached facilities (power, water, steam and testing). The main works carried out during the period of this regular inspection were the repair of an enriched uranium dissolution tank by welding, the renewal of a piping for a low activity waste liquid storing tank, and the removal of a washing tank. The total exposure dose in the first half of fiscal year 1986 was about 30.81 man-rem. (Kako, I.)

  17. Final report, Task 3: possible uses of the Nuclear Fuel Services, Inc. reprocessing plant at West Valley, New York

    International Nuclear Information System (INIS)

    1978-01-01

    The West Valley Plant could readily be used for work on reprocessing of alternative fuels, spiking, coprocessing (including CIVEX), waste solidification, and the recovery of radioactive gases. The plant could be easily modified for any scale between small-scale experimental work to production-scale demonstration, involving virtually any combination of fissile/fertile fuel materials that might be used in the future. The use of this plant for the contemplated experimental work would involve lower capital costs than the use of other facilities at DOE sites, except possibly for spiking of recovered products; the operating costs would be no greater than at other sites. The work on reprocessing of alternative fuels and coprocessing could commence within about one year; on recovery of radioactive gases, in 3 to 5 years; on spiking, in 4 years; and on waste solidification demonstration, in about 5 years. The contemplated work could be begun at this plant at least as early as at Barnwell, although work on spiking of recovered products could probably be started in existing hot cells earlier than at West Valley

  18. Status and trends in spent fuel reprocessing. Proceedings of an advisory group meeting

    International Nuclear Information System (INIS)

    1999-08-01

    Spent fuel management has always been an important part of the nuclear fuel cycle and is still one of the most important activities in all countries exploiting the peaceful use of nuclear energy. Continuous attention is being given by the IAEA to the collection, analysis and exchange of information on spent fuel management. Its role in this area is to provide a forum for exchanging information and to coordinate and encourage closer co-operation among Member States in certain research and developing activities that are of common interest. As part of spent fuel management, reprocessing activities have been reviewed from time to time on a low profile level under the terminology 'spent fuel treatment'. However, spent fuel treatment covers, in broad terms, spent fuel storage (short, interim and long term), fuel rod consolidation, reprocessing and, in case the once-through cycle is selected, conditioning of the spent fuel for disposal. Hence the reprocessing activities under the heading 'spent fuel treatment' were somewhat misleading. Several meetings on spent fuel treatment have been organized during the fast decade: an Advisory Group meeting (AGM) in 1992, a Technical Committee meeting in 1995 and recently an Advisory Group meeting from 7 to 10 September 1998. The objectives of the meetings were to review the status and trends of spent fuel reprocessing, to discuss the environmental impact and safety aspects of reprocessing facilities and to define the most important issues in this field. Notwithstanding the fact that the Summary of the report does not include aspects of military reprocessing, some of the national presentations do refer to some relevant aspects (e.g. experience, fissile stockpiles)

  19. Review of the literature for dry reprocessing oxide, metal, and carbide fuel: The AIROX, RAHYD, and CARBOX pyrochemical processes

    Energy Technology Data Exchange (ETDEWEB)

    Hoyt, R.C.; Rhee, B.W. [Rockwell International Corp., Canoga Park, CA (United States). Energy Systems Group

    1979-09-30

    The state of the art of dry processing oxide, carbide, and metal fuel has been determined through an extensive literature review. Dry processing in one of the most proliferation resistant fuel reprocessing technologies available to date, and is one of the few which can be exported to other countries. Feasibility has been established for oxide, carbide, and metal fuel on a laboratory scale, and large-scale experiments on oxide and carbide fuel have shown viability of the dry processing concept. A complete dry processing cycle has been demonstrated by multicycle processing-refabrication-reirradiation experiments on oxide fuel. Additional experimental work is necessary to: (1) demonstrate the complete fuel cycle for carbide and metal fuel, (2) optimize dry processing conditions, and (3) establish fission product behavior. Dry process waste management is easier than for an aqueous processing facility since wastes are primarily solids and gases. Waste treatment can be accomplished by techniques which have been, or are being, developed for aqueous plants.

  20. Effect of advanced fuel cycles on waste management policies

    International Nuclear Information System (INIS)

    Cavedon, J.M.; Haapalehto, T.

    2005-01-01

    The study aims at analysing a range of future fuel cycle options from the perspective of their impact on waste repository demand and specification. The study would focus on: Assessment of the characteristics of radioactive wastes arising from advanced nuclear fuel cycle options, repository performance analysis studies using source terms for waste arising from such advanced nuclear fuel cycles, identification of new options for waste management and disposal. Three families of fuel cycles having increasing recycling capabilities are assessed. Each cycle is composed of waste generating and management processes. Examples of waste generating processes are fuel factories (7 types) and reprocessing plants (7 types). Packaging and conditioning plants (7) and disposal facilities are examples of waste management processes. The characteristic of all these processes have been described and then total waste flows are summarised. In order to simplify the situation, three waste categories have been defined based on the IAEA definitions in order to emphasize the major effects of different types of waste. These categories are: short-life waste for surface or sub-surface disposal, long-life low heat producing waste for geological disposal, high-level waste for geological disposal. The feasibilities of the fuel cycles are compared in terms of economics, primary resource consumption and amount of waste generated. The effect of high-level waste composition for the repository performance is one of the tools in these comparisons. The results of this will be published as an NEA publication before the end of 2005. (authors)

  1. Analytical chemistry needs for nuclear safeguards in nuclear fuel reprocessing

    International Nuclear Information System (INIS)

    Hakkila, E.A.

    1977-01-01

    A fuel reprocessing plant designed to process 1500 tons of light water reactor fuel per year will recover 15 tons of Pu during that time, or approximately 40 to 50 kg of Pu per day. Conventional nuclear safeguards accountability has relied on batch accounting at the head and tail ends of the reprocessing plant with semi-annual plant cleanout to determine in-process holdup. An alternative proposed safeguards system relies on dynamic material accounting whereby in-line NDA and conventional analytical techniques provide indications on a daily basis of SNM transfers into the system and information of Pu holdup within the system. Some of the analytical requirements and problems for dynamic materials accounting in a nuclear fuel reprocessing plant are described. Some suggestions for further development will be proposed

  2. Management of waste from french nuclear fuel cycle: what are the key issues?

    International Nuclear Information System (INIS)

    Londres, V.; Do Quang, R.; Fournier, P.

    2000-01-01

    Like any other industry, the nuclear industry generates waste. This waste arises in the different successive stages of the fuel cycle, including nuclear power plants, and its physical and chemical properties vary greatly. What is special about it is the radioactivity it contains. Management of waste generated by spent fuel conditioning in nuclear reprocessing facilities, and which cannot be stored in surface repositories, according to current French regulations (ILW and HLW), is specifically discussed in this paper. (authors)

  3. Comparison of national programs and regulations for the management of spent fuel and disposal of high-level waste in seven countries

    International Nuclear Information System (INIS)

    Numark, N.J.; Mattson, R.J.; Gaunt, J.

    1986-01-01

    This paper describes programs and regulatory requirements affecting the management of spent fuel and disposal of high-level radioactive waste in seven nations with large nuclear power programs. The comparison is intended to illustrate that the range of spent fuel management options is influenced by certain technical and political constraints. It begins by providing overall nuclear fuel cycle facts for each country, including nuclear generating capacities, rates of spent fuel discharge, and policies on spent fuel reprocessing. Spent fuel storage techniques and reprocessing activities are compared in light of constraints such as fuel type. Waste disposal investigations are described, including a summary of the status of regulatory developments affecting repository siting and disposal. A timeline is provided to illustrate the principle milestones in spent fuel management and waste disposal in each country. Finally, policies linking nuclear power licensing and development to nuclear waste management milestones and RandD progress are discussed

  4. Management of wastes from the nuclear fuel cycle

    International Nuclear Information System (INIS)

    Heafield, W.; Barlow, P.

    1988-01-01

    The management of wastes from the nuclear fuel cycle is a key activity which affects all stages of the cycle and in which there is intense public interest, particularly at the culmination of waste management activities where dispersal and disposal are practised or are proposed. The different categories of waste are considered - high, intermediate and low level. A description is given of how and where in the fuel cycle they are produced, giving indications of volumes and activities. The fundamental objectives of waste management are reviewed and the application of these objectives to select practicable waste management processes, covering process systems product and safety considerations is discussed. Current technology can deal with the wastes now in storage, those which will be generated from oxide fuel reprocessing and future decommissioning activities; examples of these technologies, ranging from compaction and incineration for low level waste, encapsulation for intermediate level waste through to vitrification for high level waste, are described. The specific objectives relating to disposal are considered in the context of international co-operation on development and national strategies aimed at providing safe, deep repositories over the next 20 years. (author)

  5. Optimization of the sizes and dates of starting up of reprocessing plants

    International Nuclear Information System (INIS)

    Nagashima, Kikusaburo

    1977-01-01

    It is desirable to complete the nuclear fuel cycle domestically for promoting nuclear power generation in Japan, and the reprocessing of spent fuel is indispensable. However, the capacity of the reprocessing plant in PNC and the reprocessing by the commissioning to foreign countries will be insufficient by the latter half of 1980s. In the planning of the second reprocessing plant in Japan, the following problems remain yet to be solved. The international regulation and the laws in Japan regarding the storage and transport of spent fuel, the disposal of radioactive wastes, and the recycling of plutonium must be established. The consensus of the public on the necessity and the safety of fuel reprocessing must be obtained. The technical investigation about fuel reprocessing and related business must be carried out sufficiently, including the necessity of introducing the technology from abroad. The economy and various conditions for industrializing fuel reprocessing must be studied. The economy of fuel reprocessing plants, the reprocessing cost taking escalation into account, mean reprocessing cost, the optimization of the time of starting full operation and the time of starting-up, the rise of reprocessing cost due to the escalation of operational cost are explained. Numerical calculation was carried out about the second reprocessing plant in Japan, and the results are examined. (Kako, I.)

  6. Transmutation Strategy Using Thorium-Reprocessed Fuel ADS for Future Reactors in Vietnam

    Directory of Open Access Journals (Sweden)

    Thanh Mai Vu

    2013-01-01

    Full Text Available Nuclear power is believed to be a key to the energy security for a developing country like Vietnam where the power demanding increases rapidly every year. Nevertheless, spent nuclear fuel from nuclear power plants is the source of radiotoxic and proliferation risk. A conceptual design of ADS utilizing thorium fuel as a based fuel and reprocessed fuel as a seed for nuclear waste transmutation and energy production is proposed as one of the clean, safe, and economical solutions for the problem. In the design, 96 seed assemblies and 84 blanket assemblies were inserted into the core to make a heterogeneous subcritical core configuration. Introducing thorium fuel into the core offers an effective way to transmute plutonium and minor actinide (MA and gain energy from this process. Transmutation rate as a function of burnup is estimated using MCNPX 2.7.0 code. Results show that by using the seed-blanket designed ADS, at 40 GWd/t burnup, 192 kg of plutonium and 156 kg of MA can be eliminated. Equivalently, 1  ADS can be able to transmute the transuranic (TRU waste from 2  LWRs. 14 units of ADS would be required to eliminate TRUs from the future reactors to be constructed in Vietnam.

  7. The regulations concerning the reprocessing business of spent fuels

    International Nuclear Information System (INIS)

    1987-01-01

    Regulations specified here cover application for such matters as designation of reprocessing undertaking, permission of construction of reprocessing facilities, permission and approval of alteration (of plan for reprocessing facilities), etc. The regulations also cover application for prior inspection, execution of prior inspection, technical standards concerning performance of reprocessing facilities, certificate of prior inspection, reprocessing facilities subject to welding inspection, application for welding inspection, execution of welding inspection, facilities not subject to welding inspection, approval of welding method, welding inspection for imported equipment, certificate of welding inspection, reprocessing facilities subject to regular inspection, application for regular inspection, technical standards for regular inspection, operation plan, application for approval of joint management, record keeping, restriction on access to areas under management, measures concerning exposure to radioactive rays, patrol and checking in reprocessing facilities, operation of reprocessing facilities, self-imposed regular inspection of reprocessing facilities, transportation within plant or operation premises, storage, waste disposal within plant or operation premises, safety rules, notice of disassembly, measures for emergency, notice of abolition of business, notice of disorganization, measures concerning cancellation of designation, submission of report, etc. (Nogami, K.)

  8. Spent fuel, plutonium and nuclear waste: long-term management; Le combustible use et le plutonium en tant que dechets nucleaires: gestion a long terme

    Energy Technology Data Exchange (ETDEWEB)

    Collard, G

    1998-11-01

    Different options for the management of nuclear waste arising from the nuclear fuel cycle are discussed. Special emphasis is on reprocessing followed by geological disposal, geological disposal of reprocessing waste, direct geological disposal of spent nuclear fuel, long term storage. Particular emphasis is on the management of plutonium including recycling, immobilisation and disposal, partitioning and transmutation.

  9. Trivalent lanthanide/actinide separation in the spent nuclear fuel wastes' reprocessing

    International Nuclear Information System (INIS)

    Narbutt, J.; Krejzler, J.

    2006-01-01

    Separation of trivalent actinides, in particular americium and curium, from lanthanides is an important step in an advanced partitioning process for future reprocessing of spent nuclear fuels. Since the trivalent actinides and lanthanides have similar chemistries, it is rather difficult to separate them from each other. The aim of presented work was to study solvent extraction of Am(III) and Eu(III) in a system containing diethylhemi-BTP (6-(5,6-diethyl-1,2,4-triazin-3-yl)-2,2'-bipyridine) and COSAN (protonated bis(chlorodicarbollido)cobalt(III)). The system was chosen by several groups working in the integrated EC research Project EUROPART. Several physicochemical properties of the extraction system were analyzed and discussed

  10. Emerging Trends in the Nuclear Fuel Cycle: Implications for Waste Management

    International Nuclear Information System (INIS)

    Spradley, L.; Camper, L.; Rehmann, M.

    2009-01-01

    There are emerging trends in the nuclear fuel cycle that have implications for waste management. This paper will discuss activities in both the front-end and back-end of the nuclear fuel cycle for the U.S. Nuclear Regulatory Commission (NRC)-regulated entities. Particular focus will be given to the front-end which includes uranium recovery facilities, conversion facilities, and enrichment facilities. The back-end activities include progress on the proposed high-level waste geologic repository at Yucca Mountain, NV and efforts to reprocess spent nuclear fuel or down-blend HEU. While there are potential environmental impacts due to construction and dismantling of fuel cycle facilities, this paper focuses on the operational waste stream that will need to be managed as a result of fuel-cycle facilities. (authors)

  11. Safety in connection with the request for approval of the installation alteration in the fuel reprocessing facilities of Power Reactor and Nuclear Fuel Development Corporation (report)

    International Nuclear Information System (INIS)

    1982-01-01

    A report to the Prime Minister by the Nuclear Safety Commission was presented concerning the safety in the installation alteration of the fuel reprocessing facilities, as PNC had requested its approval to the Prime Minister. The safety was confirmed. The items of examination on the safety made by the committee on Examination of Nuclear Fuel Safety of NSC were the aseismic design of liquid waste storage, uranium denitration facility, intermediate gate and radioactive solid waste storage; the criticality safety design of the denitration facility; the radiation shielding design of the liquid waste storage, denitration facility and solid waste storage; the function of radioactive material containment of the liquid waste storage and denitration facility; the radiation control in the liquid waste storage, denitration facility and solid waste storage; the waste management in the liquid waste storage and denitration facility; fire and explosion prevention in the liquid waste storage; exposure dose from the liquid waste storage and denitration facility. (Mori, K.)

  12. Reprocessing of AHWR spent-fuel: Challenges and strategies

    International Nuclear Information System (INIS)

    Kant, S.

    2005-01-01

    Reprocessing of advanced heavy water reactor (AHWR) spent-fuel involves separation of Th, 233 U and Pu, from the fission products and from one another. A proper combination of Purex and Thorex processes is required. The technology development for a reprocessing facility is extremely complex owing to high fissile content, high levels of irradiation, presence high of levels of 232 U, difficulty in thoria dissolution, presence of thorium as the major constituent, problems due to third phase formation with Th, etc. It demands for development of suitable dissolution, solvent extraction, criticality control, U-Pu partitioning, and other equipments and/or techniques. Process modelling, simulation and optimisation are crucial in predicting behaviour of equipments/cycles, and in arriving at safe and optimum flowsheet. A significant success in this field has been achieved. This paper describes the reprocessing aspects pertaining to AHWR spent-fuel, indicating the major technological challenges, strategies to be followed and development requirements. A schematic flowsheet is proposed for Th- 233 U-Pu separation. (author)

  13. Pilot and pilot-commercial plants for reprocessing spent fuels of FBR type reactors

    International Nuclear Information System (INIS)

    Shaldaev, V.S.; Sokolova, I.D.

    1988-01-01

    A review of modern state of investigations on the FBR mixed oxide uranium-plutonium fuel reprocessing abroad is given. Great Britain and France occupy the leading place in this field, operating pilot plants of 5 tons a year capacity. Technology of spent fuel reprocessing and specific features of certain stages of the technological process are considered. Projects of pilot and pilot-commercial plants of Great Britain, France, Japan, USA are described. Economic problems of the FBR fuel reprocessing are touched upon

  14. The refurbishment of the D1206 fuel reprocessing plant

    International Nuclear Information System (INIS)

    Bailey, G.

    1988-01-01

    The term decommissioning can be applied not only to reactors but to any nuclear plant, laboratory, building or part of a building that may have been associated with radioactive material and needs to be restored to clean conditions. In this case the decommissioning and reconstruction of the Dounreay Fast Reactor fuel reprocessing plant, so that plutonium oxide could be reprocessed as well as enriched uranium fuel, is described. The work included improving containment and shielding, building a new head-end treatment cave for the more complex and larger fuel elements, improving the ventilation and constructing a new dissolver. In this paper the breakdown cave and dissolver cell are described and compared and the work done explained. (U.K.)

  15. A comparative assessment of alternative waste management procedures for selected reprocessing wastes

    International Nuclear Information System (INIS)

    Hickford, G.E.; Plews, M.J.

    1983-07-01

    This report, which has been prepared by Associated Nuclear Services for the Department of the Environment, presents the results of a study and comparative assessment of management procedures for low and intermediate level solid waste streams arising from current and future fuel reprocessing operations on the Sellafield site. The characteristics and origins of the wastes under study are discussed and a reference waste inventory is presented, based on published information. Waste management strategy in the UK and its implications for waste conditioning, packaging and disposal are discussed. Wastes currently arising which are not suitable for Drigg burial or sea dumping are stored in an untreated form. Work is in hand to provide additional and improved disposal facilities which will accommodate all the waste streams under study. For each waste stream viable procedures are identified for further assessment. The procedures comprise a series of on-site operations-recovery from storage, pre-treatment, treatment, encapsulation, and packaging, prior to storage or disposal of the conditioned waste form. Assessments and comparisons of each procedure for each waste are presented. These address various process, operational, economic, radiological and general safety factors. The results are presented in a series of tables with supporting text. For the majority of wastes direct encapsulation with minimal treatment appears to be a viable procedure. Occupational exposure and general safety are not identified as significant factors governing the choice of procedures. The conditioned wastes meet the general requirements for safe handling during storage and transportation. The less active wastes suitable for disposal by currently available routes meet the appropriate disposal criteria. It is not possible to consider in detail the suitability for disposal of the more active wastes for which disposal facilities are not yet available. (Author)

  16. Inventory estimation for nuclear fuel reprocessing systems

    International Nuclear Information System (INIS)

    Beyerlein, A.L.; Geldard, J.F.

    1987-01-01

    The accuracy of nuclear material accounting methods for nuclear fuel reprocessing facilities is limited by nuclear material inventory variations in the solvent extraction contactors, which affect the separation and purification of uranium and plutonium. Since in-line methods for measuring contactor inventory are not available, simple inventory estimation models are being developed for mixer-settler contactors operating at steady state with a view toward improving the accuracy of nuclear material accounting methods for reprocessing facilities. The authors investigated the following items: (1) improvements in the utility of the inventory estimation models, (2) extension of improvements to inventory estimation for transient nonsteady-state conditions during, for example, process upset or throughput variations, and (3) development of simple inventory estimation models for reprocessing systems using pulsed columns

  17. Nuclear fuel reprocessing expansion strategies

    International Nuclear Information System (INIS)

    Gallagher, J.M.

    1975-01-01

    A description is given of an effort to apply the techniques of operations research and energy system modeling to the problem of determination of cost-effective strategies for capacity expansion of the domestic nuclear fuel reprocessing industry for the 1975 to 2000 time period. The research also determines cost disadvantages associated with alternative strategies that may be attractive for political, social, or ecological reasons. The sensitivity of results to changes in cost assumptions was investigated at some length. Reactor fuel types covered by the analysis include the Light Water Reactor (LWR), High-Temperature Gas-Cooled Reactor (HTGR), and the Fast Breeder Reactor (FBR)

  18. Division of Waste Management, Production, and Reprocessing programs progress report for January--December 1976

    International Nuclear Information System (INIS)

    Lerch, R.E.

    1977-04-01

    Development of the acid digestion process for treating combustible nuclear wastes has progressed to design and construction of the Radioactive Acid Digestion Test Unit (RADTU). Tests were continued in the nonradioactive Acid Digestion Test Unit (ADTU) in an effort to improve the performance of the system. Nitric acid consumption has been decreased from 8.8 to 4.5 kg HNO 3 /kg digested waste by adding the nitric acid deep below the liquid surface in the annular heating vessel instead of at the surface of the tray digester. A highly successful 70-hr continuous processing run was completed in the ADTU to confirm the operating experience in shorter runs and to test the use of air (instead of nitrogen) in the airlift pump. Initial studies were completed on fixation of acid digestion residue following recovery and drying. A variety of solidification and testing equipment was assembled to prepare and test immobilized waste products. Studies were continued on immobilization of salts and wet wastes. Salt residue-cement systems characterized include calcium sulfate, ferric sulfate, sodium sulfate, sodium nitrate, calcium chloride, and sodium chloride. Anion and cation exchange resin immobilization in cement has also been studied, as well as immobilization of sodium silicate in cement. A new program on Intermediate Level Liquid Waste (ILLW) Solidification was started with the purpose of developing and demonstrating immobilization technologies for liquid and particulate solid ILW within the fuel cycle. The four primary fuel cycle operations (reactors, spent fuel storage basins, fuel reprocessing plants, and MOX fuel fabrication plants) were reviewed and a list of sources and quantities of waste was formulated. The annual accumulation of radioactive waste materials at the six commercial waste burial sites was updated through 1976. The total accumulated volume at the end of 1976 was about 434,000 m 3

  19. Fuel reprocessing data validation using the isotope correlation technique

    International Nuclear Information System (INIS)

    Persiani, P.J.; Bucher, R.G.; Pond, R.B.; Cornella, R.J.

    1990-01-01

    The Isotope Correlation Technique (ICT), in conjunction with the gravimetric (Pu/U ratio) method for mass determination, provides an independent verification of the input accountancy at the dissolver or accountancy stage of the reprocessing plant. The Isotope Correlation Technique has been applied to many classes of domestic and international reactor systems (light-water, heavy-water, and graphite reactors) operating in a variety of modes (power, research, and production reactors), and for a variety of reprocessing fuel cycle management strategies. Analysis of reprocessing operations data based on isotopic correlations derived for assemblies in a PWR environment and fuel management scheme, yielded differences between the measurement-derived and ICT-derived plutonium mass determinations of (- 0.02 ± 0.23)% for the measured U-235 and (+ 0.50 ± 0.31)% for the measured Pu-239, for a core campaign. The ICT analyses has been implemented for the plutonium isotopics in a depleted uranium assembly in a heavy-water, enriched uranium system and for the uranium isotopes in the fuel assemblies in light-water, highly-enriched systems

  20. Electrochemical reprocessing of nuclear fuels

    International Nuclear Information System (INIS)

    Brambilla, G.; Sartorelli, A.

    1980-01-01

    A method is described for the reprocessing of irradiated nuclear fuel which is particularly suitable for use with fuel from fast reactors and has the advantage of being a dry process in which there is no danger of radiation damage to a solvent medium as in a wet process. It comprises the steps of dissolving the fuel in a salt melt under such conditions that uranium and plutonium therein are converted to sulphate form. The plutonium sulphate may then be thermally decomposed to PuO 2 and removed. The salt melt is then subjected to electrolysis conditions to achieve cathodic deposition of UO 2 (and possibly PuO 2 ). The salt melt can then be recycled or conditioned for final disposal. (author)

  1. Air conditioning facilities in a fuel reprocessing plant

    International Nuclear Information System (INIS)

    Kawasaki, Michitaka; Oka, Tsutomu

    1987-01-01

    Reprocessing plants are the facilities for separating the plutonium produced by nuclear reaction and unconsumed remaining uranium from fission products in the spent fuel taken out of nuclear reactors and recovering them. The fuel reprocessing procedure is outlined. In order to ensure safety in handling radioactive substances, triple confinement using vessels, concrete cells and buildings is carried out in addition to the prevention of criticality and radiation shielding, and stainless steel linings and drip trays are installed as occasion demands. The ventilation system in a reprocessing plant is roughly divided into three systems, that is, tower and tank ventilation system to deal with offgas, cell ventilation system for the cells in which main towers and tanks are installed, and building ventilation system. Air pressure becomes higher from tower and tank system to building system. In a reprocessing plant, the areas in a building are classified according to dose rate. The building ventilation system deals with green and amber areas, and the cell ventilation system deals with red area. These three ventilation systems are explained. Radiation monitors are installed to monitor the radiation dose rate and air contamination in working places. The maintenance and checkup of ventilation systems are important. (Kako, I.)

  2. Determination of zirconium 93 and molybdenum 93 in reprocessing nuclear waste

    International Nuclear Information System (INIS)

    Puech, P.

    1998-01-01

    The aim of this work is to find new determination methods of zirconium 93 and molybdenum 93 (two long-lived radioelements) contained in reprocessing nuclear waste. 93 Zr has a very long period: 1.5 * 10 6 years. The measurement of this isotope is more performing by the ICP-MS method than by the classical radiochemical measurement methods. 93 Mo disintegrates with a radioactive period of 4000 years and can be detected by radiochemical measurement in particular by X spectrometry. But these radioelements cannot be directly measured on the reprocessing nuclear waste; they require a preliminary chemical separation (removing the radioelements able to interfere and those responsible of the radioactivity of the nuclear waste). The separation is implemented with very potentially selective techniques, using Mo and Zr specific extracting molecules: solvent extraction, emulsified liquid membrane extraction and liquid chromatography extraction (on a resin impregnated by solvent). Studies carried out in CEA/Cadarache, on a synthetic solution simulating a reprocessing nuclear waste, have allowed to show the selective properties of the L'-benzoinoxime for extracting Mo and of TBP for extracting Zr for the three studied techniques. The optimal extraction and separation conditions have been reached with a methodology including experiment plans. At last, the methods have been tested on real reprocessing nuclear waste at Cogema/La Hague. 93 Zr and 93 Mo have been measured in a dissolution solution and in a fission product solution. The obtained values are 2 * 10 6 Bq/l and 10 7 Bq/l for 93 Zr and 500 Bq/l for 93 Mo in a dissolution solution. These methods have allowed to determine too the isotopic compositions for Mo and Zr elements contained in reprocessing nuclear waste. The results are in accordance with those obtained with the Cesar code. (O.M.)

  3. Characteristics of potential repository wastes

    International Nuclear Information System (INIS)

    1992-07-01

    The LWR spent fuels discussed in Volume 1 of this report comprise about 99% of all domestic non-reprocessed spent fuel. In this report we discuss other types of spent fuels which, although small in relative quantity, consist of a number of diverse types, sizes, and compositions. Many of these fuels are candidates for repository disposal. Some non-LWR spent fuels are currently reprocessed or are scheduled for reprocessing in DOE facilities at the Savannah River Site, Hanford Site, and the Idaho National Engineering Laboratory. It appears likely that the reprocessing of fuels that have been reprocessed in the past will continue and that the resulting high-level wastes will become part of defense HLW. However, it is not entirely clear in some cases whether a given fuel will be reprocessed, especially in cases where pretreatment may be needed before reprocessing, or where the enrichment is not high enough to make reprocessing attractive. Some fuels may be canistered, while others may require special means of disposal. The major categories covered in this chapter include HTGR spent fuel from the Fort St. Vrain and Peach Bottom-1 reactors, research and test reactor fuels, and miscellaneous fuels, and wastes generated from the decommissioning of facilities

  4. Idaho Chemical Processing Plant spent fuel and waste management technology development program plan: 1994 Update

    International Nuclear Information System (INIS)

    1994-09-01

    The Department of Energy has received spent nuclear fuel (SNF) at the Idaho Chemical Processing Plant (ICPP) for interim storage since 1951 and reprocessing since 1953. Until April 1992, the major activity of the ICPP was the reprocessing of SNF to recover fissile uranium and the management of the resulting high-level wastes (HLW). In 1992, DOE chose to discontinue reprocessing SNF for uranium recovery and shifted its focus toward the continued safe management and disposition of SNF and radioactive wastes accumulated through reprocessing activities. Currently, 1.8 million gallons of radioactive liquid wastes (1.5 million gallons of radioactive sodium-bearing liquid wastes and 0.3 million gallons of high-level liquid waste), 3,800 cubic meters of calcine waste, and 289 metric tons heavy metal of SNF are in inventory at the ICPP. Disposal of SNF and high-level waste (HLW) is planned for a repository. Preparation of SNF, HLW, and other radioactive wastes for disposal may include mechanical, physical, and/or chemical processes. This plan outlines the program strategy of the ICPP spent Fuel and Waste Management Technology Development Program (SF ampersand WMTDP) to develop and demonstrate the technology required to ensure that SNF and radioactive waste will be properly stored and prepared for final disposal in accordance with regulatory drivers. This Plan presents a brief summary of each of the major elements of the SF ampersand WMTDP; identifies key program assumptions and their bases; and outlines the key activities and decisions that must be completed to identify, develop, demonstrate, and implement a process(es) that will properly prepare the SNF and radioactive wastes stored at the ICPP for safe and efficient interim storage and final disposal

  5. Spent fuel reprocessing system security engineering capability maturity model

    International Nuclear Information System (INIS)

    Liu Yachun; Zou Shuliang; Yang Xiaohua; Ouyang Zigen; Dai Jianyong

    2011-01-01

    In the field of nuclear safety, traditional work places extra emphasis on risk assessment related to technical skills, production operations, accident consequences through deterministic or probabilistic analysis, and on the basis of which risk management and control are implemented. However, high quality of product does not necessarily mean good safety quality, which implies a predictable degree of uniformity and dependability suited to the specific security needs. In this paper, we make use of the system security engineering - capability maturity model (SSE-CMM) in the field of spent fuel reprocessing, establish a spent fuel reprocessing systems security engineering capability maturity model (SFR-SSE-CMM). The base practices in the model are collected from the materials of the practice of the nuclear safety engineering, which represent the best security implementation activities, reflect the regular and basic work of the implementation of the security engineering in the spent fuel reprocessing plant, the general practices reveal the management, measurement and institutional characteristics of all process activities. The basic principles that should be followed in the course of implementation of safety engineering activities are indicated from 'what' and 'how' aspects. The model provides a standardized framework and evaluation system for the safety engineering of the spent fuel reprocessing system. As a supplement to traditional methods, this new assessment technique with property of repeatability and predictability with respect to cost, procedure and quality control, can make or improve the activities of security engineering to become a serial of mature, measurable and standard activities. (author)

  6. Economic feasibility study of regional centers for nuclear fuel reprocessing in the developing countries

    International Nuclear Information System (INIS)

    Bakeshloo, A.A.

    1977-01-01

    The fuel cycle costs for the following three different economic alternatives were studied: (1) Reprocessing in an industrialized country (such as the U.S.); (2) Reprocessing in the individual developing country; (3) Reprocessing in a regional center. The nuclear fuel cycle cost for the ''Throw-away'' fuel cycle was evaluated. Among the six regions which were considered in this study, region one (South America including Mexico) was selected for the economic analysis of the nuclear fuel cycle for the above three alternatives. For evaluation of the cases where the fuel is reprocessed in a regional center or in an individual developing country, a unit reprocessing cost equation was developed. An economic evaluation was developed to estimate the least expensive method for transporting radioactive nuclear material by either leased or purchased shipping casks. The necessary equations were also developed for estimating plutonium transportation and the safeguard costs. On the basis of nuclear material and services requirements and unit costs for each component, the levelized nuclear fuel cycle costs for each alternative were estimated. Finally, by a comparison of cost, among these three alternatives plus the ''Throw-away'' case,it was found that it is not at all economical to build individual reprocessing plants inside the developing countries in region one. However, it also was found that the economic advantage of a regional center with respect to the first alternative is less than a 4% difference between their total fuel cycle costs. It is concluded that there is no great economic advantage in any developing countries to seek to process their fuel in one of the advanced countries. Construction of regional reprocessing centers is an economically viable concept

  7. Swedish approach to spent fuel management as regards intermediate storage and reprocessing

    International Nuclear Information System (INIS)

    Gustafsson, B.

    1980-01-01

    The cost of spent fuel management has been calculated to be between SEK 0.006 and 0.015 per kWh, depending upon what assumptions are made. Assuming that spent fuel from 12 reactors is reprocessed and that the radioactive waste is conditioned, transported, temporarily stored, and finally disposed of, the alternative cost SEK 0.006/kWh results from a low estimate of the costs incurred for the waste and a high estimate of credits allowed for recovered uranium and plutonium. This, in turn, assumes a certain real price increase for uranium and a value for plutonium corresponding to the quantity of energy represented by the material. The high alternative is based on a high estimate of the costs incurred for the waste and a low estimate of the credits allowed for recovered uranium and plutonium. This, in turn, assumes today's price for uranium and no credits at all for plutonium. Swedish power producers are now reserving SEK 0.01/kWh for future investment requirements for spent fuel management and waste disposal. The total allocation up to the current year amounts to about SEK 1000 million. Capacity for the temporary storage of spent fuel exists at the Swedish nuclear power plants. As a result of the construction of a central storage facility for spent fuel (CLAB) in Sweden, this buffer capacity will be increased to accommodate fuel from approximately 12 years of operation. The CLAB has a design capacity of 3000 tons of spent fuel. Construction of the facility, which is basically a rock cavern containing water-filled pools, started in May 1980 with operation planned in early 1985. Expansion of capacity for an additional 6000 tons is possible if it is needed. As a result of planned domestic measures, freedom of action with respect to the back-end of the nuclear fuel cycle will be obtained; a high degree of independence from industrial and political developments abroad will also be obtained

  8. Wastes from selected activities in two light-water reactor fuel cycles

    International Nuclear Information System (INIS)

    Palmer, C.R.; Hill, O.F.

    1980-07-01

    This report presents projected volumes and radioactivities of wastes from the production of electrical energy using light-water reactors (LWR). The projections are based upon data developed for a recent environmental impact statement in which the transuranic wastes (i.e., those wastes containing certain long-lived alpha emitters at concentrations of at least 370 becquerels, or 10 nCi, per gram of waste) from fuel cycle activities were characterized. In addition, since the WG.7 assumed that all fuel cycle wastes except mill tailings are placed in a mined geologic repository, the nontransuranic wastes from several activities are included in the projections reported. The LWR fuel cycles considered are the LWR, once-through fuel cycle (Strategy 1), in which spent fuel is packaged in metal canisters and then isolated in geologic formations; and the LWR U/Pu recycle fuel cycle (Strategy 2), wherein spent fuel is reprocessed for recovery and recycle of uranium and plutonium in LWRs. The wastes projected for the two LWR fuel cycles are summarized. The reactor operations and decommissioning were found to dominate the rate of waste generation in each cycle. These activities account for at least 85% of the fuel cycle waste volume (not including head-end wastes) when normalized to per unit electrical energy generated. At 10 years out of reactor, however, spent fuel elements in Strategy 1 represent 98% of the fuel cycle activity but only 4% of the volume. Similarly, the packaged high-level waste, fuel hulls and hardware in Strategy 2 concentrate greater than 95% of the activity in 2% of the waste volume

  9. Integrated international safeguards concepts for fuel reprocessing

    International Nuclear Information System (INIS)

    Hakkila, E.A.; Gutmacher, R.G.; Markin, J.T.; Shipley, J.P.; Whitty, W.J.; Camp, A.L.; Cameron, C.P.; Bleck, M.E.; Ellwein, L.B.

    1981-12-01

    This report is the fourth in a series of efforts by the Los Alamos National Laboratory and Sandia National Laboratories, Albuquerque, to identify problems and propose solutions for international safeguarding of light-water reactor spent-fuel reprocessing plants. Problem areas for international safeguards were identified in a previous Problem Statement (LA-7551-MS/SAND79-0108). Accounting concepts that could be verified internationally were presented in a subsequent study (LA-8042). Concepts for containment/surveillance were presented, conceptual designs were developed, and the effectiveness of these designs was evaluated in a companion study (SAND80-0160). The report discusses the coordination of nuclear materials accounting and containment/surveillance concepts in an effort to define an effective integrated safeguards system. The Allied-General Nuclear Services fuels reprocessing plant at Barnwell, South Carolina, was used as the reference facility

  10. Radioactive wastes. Commune convention about the safety of spent fuel management and about the radioactive waste management

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    This common convention do not give detailed safety standards but general obligations whom objective is the development of a safety culture in the world. It concerns the spent fuels (valuable and valued by the reprocessing) and radioactive wastes (matter without any later use). (N.C.)

  11. Lectures of the 6th status report on the project for reprocessing and waste treatment on March 13th/14th 1986

    International Nuclear Information System (INIS)

    1987-04-01

    The report contains 28 lectures on reprocessing mainly LWR and also FBR fuel and on the treatment of waste concentrates from the PUREX process. They were recorded separately for the databases INIS and ENERGY. The lectures reflect the state of development with reference to the large 350 t/year reprocessing plant at Wackersdorf in West Germany, for which the first part authorisation for erection was granted by the appropriate authorities. (RB) [de

  12. Radionuclide compositions of spent fuel and high level waste from commercial nuclear reactors

    International Nuclear Information System (INIS)

    Goodill, D.R.; Tymons, B.J.

    1984-10-01

    This report provides information on radionuclide compositions of spent fuel and high level waste produced during reprocessing. The reactor types considered are Magnox, AGR, PWR and CFR. The activities of the radionuclides are calculated using the FISPIN code. The results are presented in a form suitable for radioactive waste management calculations. (author)

  13. Fuel fabrication and reprocessing at UKAEA Dounreay

    International Nuclear Information System (INIS)

    Anderson, B.

    1994-01-01

    The Dounreay fuel plants, which are the most flexible anywhere in the world, will continue to carry out work for foreign commercial customers. A number of German companies are important customers of UKAEA and examples of the wide variety of the work currently being carried out for them in the Dounreay plants is given (reprocessing and fabrication of fuel elements from and for research reactors). (orig./HP) [de

  14. The French R and D programme for fast reactor fuel reprocessing

    International Nuclear Information System (INIS)

    Auchapt, P.; Bourgeois, M.; Calame-Longjean, A.; Miquel, P.; Sauteron, J.

    1979-01-01

    The process employed is the Purex process adapted to the specific case of fast breeder reactor fuels. The results achieved have demonstrated that the aqueous method can be applied to these fuels: nearly ten years of operation in the ATl workshop which reprocesses RAPSODIE fuels, and the good results obtained at the Marcoule pilot facility on large batches of fuel attest to this achievement. The CEA effort continues principally on extrapolation to industrial scale, thanks mainly to experiments conducted on industrial prototypes and to the launching of the TOR project, which will, as of 1984, allow reprocessing of FBR fuels on a significant scale, and which will provide extensive additional resources for R and D activities

  15. Chemical problems associated with reprocessing

    International Nuclear Information System (INIS)

    Chesne, A.

    1981-09-01

    This paper is an attempt to pinpoint the chemical problems raised by the reprocessing of oxide base fuels. Taking the reprocessing of slightly irradiated metallic fuels as a reference, for which long experience has been gained, a review is made of the various stages of the Purex process, in which the increase in mass and activity of the actinides and fission products engenders constraints related to the recovery of fissile materials, their purification, the release rate and, in general, the operation of the installations. The following subjects are discussed: dissolution from the standpoint of dissolution residues and iodine trapping, extraction cycles with respect to the behavior of ruthenium, neptunium, plutonium, technetium and palladium, the recycling of medium activity wastes

  16. Design study on advanced nuclear fuel recycling system by pyrometallurgical reprocessing technology

    Energy Technology Data Exchange (ETDEWEB)

    Kasai, Yoshimitsu; Kakehi, Isao; Moro, Satoshi; Tobe, Kenji; Kawamura, Fumio; Higashi, Tatsuhiro; Yonezawa, Shigeaki [Japan Nuclear Cycle Development Inst., Oarai, Ibaraki (Japan). Oarai Engineering Center; Yoshiuji, Takahiro

    1998-12-01

    The Japan Nuclear Fuel Cycle Development Institute is conducting research and development on the nuclear fuel recycling system, which will improve the economy, safety, and environmental impact of the nuclear fuel recycling system in the age of the FBR. The System Engineering Division in the O-arai Engineering Center has conducted a design study on an advanced nuclear fuel recycling system for FBRs by using pyrometallurgical reprocessing technology. The system is an economical and compact module-type system, and can be used for reprocessing oxide fuel and also new types of fuel (metal fuel and nitride fuel). This report describes the concept of this system and results of the design study. (author)

  17. Design study on advanced nuclear fuel recycling system by pyrometallurgical reprocessing technology

    International Nuclear Information System (INIS)

    Kasai, Yoshimitsu; Kakehi, Isao; Moro, Satoshi; Tobe, Kenji; Kawamura, Fumio; Higashi, Tatsuhiro; Yonezawa, Shigeaki; Yoshiuji, Takahiro

    1998-01-01

    The Japan Nuclear Fuel Cycle Development Institute is conducting research and development on the nuclear fuel recycling system, which will improve the economy, safety, and environmental impact of the nuclear fuel recycling system in the age of the FBR. The System Engineering Division in the O-arai Engineering Center has conducted a design study on an advanced nuclear fuel recycling system for FBRs by using pyrometallurgical reprocessing technology. The system is an economical and compact module-type system, and can be used for reprocessing oxide fuel and also new types of fuel (metal fuel and nitride fuel). This report describes the concept of this system and results of the design study. (author)

  18. Development of a real-time detection strategy for process monitoring during nuclear fuel reprocessing using the UREX+3a method

    International Nuclear Information System (INIS)

    Goddard, Braden; Charlton, William S.; McDeavitt, Sean M.

    2010-01-01

    Research highlights: → HPGe detectors are suitable for UREX+3a real-time spectroscopy. → HPGe N-type detectors may be suitable for a reprocessing facility. → Gamma ray self-shielding does not occur for pipe diameters less than 2 in. - Abstract: Reprocessing nuclear fuel is becoming more viable in the United States due to the anticipated increase in construction of nuclear power plants, the growing stockpile of existing used nuclear fuel, and a public desire to reduce the amount of this fuel. A new reprocessing facility will likely have state of the art controls and monitoring methods to safeguard special nuclear materials, as well as to provide real-time monitoring for process control. The focus of this research was to create a proof of concept to enable the development of a detection strategy that uses well established gamma and neutron measurement methods to characterize samples from the Uranium Extraction Plus 3a (UREX+3a) reprocessing method using a variety of detector types and measurement times. A facility that implemented real-time gamma detection equipment could improve product quality control and provide additional benefits, such as waste volume reduction. In addition to the spectral analyses, it was determined by Monte Carlo N Particle (MCNP) simulations that there is no noticeable self-shielding for internal pipe diameters less than 5.08 cm, indicating that no self-shielding correction factors are needed. Further, it was determined that High Purity Germanium (HPGe) N-type detectors have the high gamma ray energy resolution and neutron damage resistance that would be required in a reprocessing facility. Finally, the gamma ray spectra for the measured samples were simulated using MCNP and then the model was extended to predict the responses from an actual reprocessing scenario from UREX+3a applied to fuel that had a decay time of 3 years. The 3-year decayed fuel was more representative of commercially reprocessed fuel than the acquired UREX+3a

  19. ERDA activities related to reprocessing and plutonium recycle

    International Nuclear Information System (INIS)

    Spurgeon, D.R.

    1977-01-01

    ERDA has redirected its program in support of the LWR fuel cycle from one emphasizing the commercialization of existing fuel cycle technology to a broader based assessment of alternative fuel cycle concepts with the emphasis on safeguardability and avoidance of proliferation risks. As part of this program, ERDA will evaluate a number of possible technical and institutional options to reduce proliferation risks. ERDA will continue its current program of LWR fuel reprocessing R and D with added emphasis on improved safeguards capability as well as the applicability of conventional reprocessing technology to large multinational plants. These activities and supporting design studies will provide the basis for a decision regarding the design of an optimized system for the management of spent LWR fuel. Such a system would provide a model for the development of future domestic and foreign facilities and programs. A recently completed ERDA study of the benefits of LWR reprocessing and recycle would also be expected to be factored into such a decision. The study concluded that based on currently available data, recycle of uranium and plutonium in LWR's is attractive from the standpoint of economics and resource utilization relative to the discarding of spent fuel. The LWR reprocessing/recycle picture today is clouded by several unresolved policy issues. These include the need for adequate spent fuel storage capacity for both domestic and foreign reactors; the possibility of foreign reprocessing of U.S. produced fuel; the possibility of the disposal of foreign fuel in the U.S.; the possible need to dispose of wastes generated by multinational reprocessing plants; and finally, determination of the optimum balance between recycling recovered plutonium and saving it for the breeder

  20. The regulations concerning the reprocessing business of spent fuels

    International Nuclear Information System (INIS)

    1978-01-01

    In compliance with ''The law for the regulations of nuclear source material, nuclear fuel material and reactors'' these regulations prescribe concerning reprocessing facilities: The procedures to apply for the approval of the design and method of construction and the approval of the change thereof; as well as the procedure to apply for the inspection of the facilities, and details of the inspection (in sections 2-6). After that, the regulations require the enterpriser of reprocessing business to keep necessary records and take necessary measures for safety concerning the facilities, operation of reprocessing equipments, and transportation, storage on disposal of used fuel, materials separated therefrom or materials contaminated by either of them (in sections 8-16). Further, the regulations prescribe the procedure to apply for the approval of the safety rule required to the enterpriser of reprocessing business by above mentioned law and specifies items which should be included into the rule (section 17). Moreover, the regulations require the enterpriser to submit reports of each use of the internationally controllled material and specifies the items which should be included into these reports (section 19). (Matsushima, A.)

  1. Plutonium, proliferation, and the price of reprocessing

    International Nuclear Information System (INIS)

    Gilinsky, V.

    1978-01-01

    France and Britain disagree with the US on whether deferring fuel reprocessing that provides plutonium for export can help contain proliferation. The US has veto power over reprocessing of US-supplied fuels for non-EURATOM countries, but exceptions will be made for movement within the EURATOM community. Political issues will be influenced by the magnitude of the financial investments, however, and commercial considerations have until recently dominated and complicated international safeguards. The author notes that US policy was reversed by the gradual acknowledgment that the same international inspection of plutonium stockpiles would not work as it had for low-enriched fuel and that economic interests must have a lower priority to avoiding proliferation. He cites the combination of sudden policy shifts, failure to prove that present reactors are best, and long-term distrust of US economic motives as failing to persuade either the French or British, who feel the best safeguard is provided by their high-security reprocessing facilities. Still to be resolved are the conditions under which plutonium must be returned to its owners, a problem that must determine safe international transport and storage and international management. Technical fixes, such as the CIVEX process, cannot contribute to the solution for several decades, while reprocessing is no longer considered a first step in waste disposal and would be more expensive and complicated than present waste disposal procedures. The author concedes merit in President Carter's requirement of separating ''the legitimate and necessary use of uranium'' and nuclear fuels that are also explosives

  2. Industrial experience of irradiated nuclear fuel reprocessing

    International Nuclear Information System (INIS)

    Delange, M.

    1981-01-01

    At the moment and during the next following years, France and La Hague plant particularly, own the greatest amount of industrial experience in the field of reprocessing, since this experience is referred to three types of reactors, either broadly spread all through the world (GCR and LWR) or ready to be greatly developed in the next future (FBR). Then, the description of processes and technologies used now in France, and the examination of the results obtained, on the production or on the security points of view, are a good approach of the actual industrial experience in the field of spent fuel reprocessing. (author)

  3. The transfer of reprocessing wastes from north-west Europe to the Arctic

    Science.gov (United States)

    Kershaw, Peter; Baxter, Amanda

    The discharge of radioactive waste, from nuclear fuel reprocessing facilities, into the coastal waters of north-west Europe has resulted in a significant increase in the inventories of a number of artificial radionuclides in the North Atlantic. Radiocaesium, 90Sr and 99Tc, which behave conservatively in seawater, have been used widely as tracers of water movement through the North Sea, Norwegian Coastal Current, Barents Sea, Greenland Sea, Fram Strait, Eurasian Basin, East Greenland Current and Denmark Strait overflow. These studies are summarised in the present paper. It has been estimated that 22% of the 137Cs Sellafield discharge has passed into the Barents Sea, en route to the Nansen Basin, via the Bjomoya-Fugloya Section, with another 13% passing through the Fram Strait. This amounts to 14 PBq 137Cs. Quantifying the influx of other radionuclides has been more problematic. The inflowing Atlantic water now appears to be diluting waters in the Arctic Basin, which were contaminated in the late 1970s and early 1980s as a result of the substantial decrease in the discharge of reprocessing wastes. Sellafield (U.K.) has dominated the supply of 134Cs, 137Cs, 90Sr, 99Tc and Pu, whereas La Hague (France) has contributed a larger proportion of 129I and 125Sb.

  4. Nondestructive determination of residual fuel on leached hulls and dissolver sludges from LWR fuel reprocessing

    International Nuclear Information System (INIS)

    Wuerz, H.; Wagner, K.; Becker, H.J.

    1990-01-01

    In reprocessing plants leached hulls and dissolver sludges represent rather important intermediate level α-waste streams. A control of the Pu content of these waste streams is desirable. The nondestructive assay method to be preferred would be passive neutron counting. However, before any decision on passive neutron monitoring becomes possible, a characterization of hulls and sludges in terms of Pu content and neutron emission is necessary. For the direct determination of Plutonium on hulls and in sludges, as coming from reprocessing, an active neutron measurement is required. A simple, and sufficiently sensitive active neutron method which can easily be installed uses a stationary 252 Cf neutron source. This method was used for the characterization of hulls and sludges in terms of Plutonium content and total neutron emission in the Karlsruhe reprocessing plant WAK

  5. Prospect of spent fuel reprocessing and back-end cycling in China in 1990's

    International Nuclear Information System (INIS)

    Ke Youzhi; Wang Rengtao

    1987-01-01

    According to the CHinese Program of nuclear energy in 1990's, the amount of spent fuel by the year 2000 is estimated in this paper. Reprocessing is considered as an important link in the back-end fuel cycle. A pilot plant is scheduled for hot start up in 1996. The main goal of the study is LWR spent fuel reprocessing. We will use the experience gained from reprocessing of production reactor fuel and last research results. The advanced foreign technigue and experience will be introduced. The study emphasizes on the test of technology, equipments, instrumentation and automation, development of remote maintenance and decontamination. China will start to demonstrate the way for fuel cycle. (author)

  6. Investigation of pharmaceuticals and medical devices containing 90Y extracted from high radioactive liquid waste in spent-fuel reprocessing

    International Nuclear Information System (INIS)

    Hosoma, Takashi

    2012-07-01

    Pharmaceuticals and medical devices containing radioactive 90 Y are realized, approved and placed on the international market where three products are available in Europe and the United States, and one product in Japan. These products are used not for diagnosis but for treatment by internal irradiation. It was estimated from the deliberative report of the approval in Japan that 90 Y was extracted in Europe from high radioactive liquid waste (HALW) yielded in spent-fuel reprocessing. In this report, products placed on the market and physical properties were reviewed, reasons of the realization and conditions to realize succeeding products were estimated, extraction method was compared with other methods, technical subjects, and relevant regulations were investigated. Although a medical device containing radioactive 90 Y has been studied in Japan and one pharmaceutical product was approved, a breakthrough would be necessary to put 90 Y utilization beyond alternative treatments. The breakthrough would become be promising; for example, if conventional treatments could be supported by technical development to deliver 90 Y more sharply to the target with shorter serum half-life. Extraction of 90 Y nuclide from HALW has advantages over thermal neutron irradiation of natural nuclide, a system is envisioned where 90 Sr as a parent nuclide is separated in the reprocessing then transported to and stored in a factory of radiopharmaceuticals followed by 90 Y extraction on demand. (author)

  7. Administrative and managerial controls for the operation of nuclear fuel reprocessing plants

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    Guidelines are provided for the administrative and managerial controls necessary for the safe and efficient operation of nuclear fuel reprocessing plants. Topics covered include: administrative organization; review and audit; facility administrative policies and procedures; and tests and inspections. Recognizing that administrative practices vary among organizations operating nuclear fuel reprocessing plants, the standard incorporates flexibility that provides for compliance by any organization

  8. Radioactive characteristics of spent fuels and reprocessing products in thorium fueled alternative cycles

    International Nuclear Information System (INIS)

    Maeda, Mitsuru

    1978-09-01

    In order to provide one fundamental material for the evaluation of Th cycle, compositions of the spent fuels were calculated with the ORIGEN code on following fuel cycles: (1) PWR fueled with Th- enriched U, (2) PWR fueled with Th-denatured U, (3) CANDU fueled with Th-enriched U and (4) HTGR fueled with Th-enriched U. Using these data, product specifications on radioactivity for their reprocessing were calculated, based on a criterion that radioactivities due to foreign elements do not exceed those inherent in nuclear fuel elements, due to 232 U in bred U or 228 Th in recovered Th, respectively. Conclusions are as the following: (1) Because of very high contents of 232 U and 228 Th in the Th cycle fuels from water moderated reactors, especially from PWR, required decontamination factors for their reprocessing will be smaller by a factor of 10 3 to 10 4 , compared with those from U-Pu fueled LWR cycle. (2) These less stringent product specifications on the radioactivity of bred U and recovered Th will justify introduction of some low decontaminating process, with additional advantage of increased proliferation resistance. (3) Decontamination factors required for HTGR fuel will be 10 to 30 times higher than for the other fuels, because of less 232 U and 228 Th generation, and higher burn-up in the fuel. (author)

  9. THE ECONOMICS OF REPROCESSING vs. DIRECT DISPOSAL OF SPENT NUCLEAR FUEL

    International Nuclear Information System (INIS)

    Bunn, Matthew; Fetter, Steve; Holdren, John P.; Zwaan, Bob van der

    2003-01-01

    This report assesses the economics of reprocessing versus direct disposal of spent nuclear fuel. The breakeven uranium price at which reprocessing spent nuclear fuel from existing light-water reactors (LWRs) and recycling the resulting plutonium and uranium in LWRs would become economic is assessed, using central estimates of the costs of different elements of the nuclear fuel cycle (and other fuel cycle input parameters), for a wide range of range of potential reprocessing prices. Sensitivity analysis is performed, showing that the conclusions reached are robust across a wide range of input parameters. The contribution of direct disposal or reprocessing and recycling to electricity cost is also assessed. The choice of particular central estimates and ranges for the input parameters of the fuel cycle model is justified through a review of the relevant literature. The impact of different fuel cycle approaches on the volume needed for geologic repositories is briefly discussed, as are the issues surrounding the possibility of performing separations and transmutation on spent nuclear fuel to reduce the need for additional repositories. A similar analysis is then performed of the breakeven uranium price at which deploying fast neutron breeder reactors would become competitive compared with a once-through fuel cycle in LWRs, for a range of possible differences in capital cost between LWRs and fast neutron reactors. Sensitivity analysis is again provided, as are an analysis of the contribution to electricity cost, and a justification of the choices of central estimates and ranges for the input parameters. The equations used in the economic model are derived and explained in an appendix. Another appendix assesses the quantities of uranium likely to be recoverable worldwide in the future at a range of different possible future prices

  10. Spent nuclear fuel reprocessing and international law. Germany's obligations under international law in matters of spent fuel reprocessing and the relevant contracts concluded with France and the United Kingdom

    International Nuclear Information System (INIS)

    Heintschel v Heinegg, W.

    1999-01-01

    The review presented is an excerpt from an expert opinion written by the author in December last year, in response to changes in nuclear energy policy announced by the new German government. The reprocessing of spent nuclear fuels from German power reactors in the reprocessing facilities of France (La Hague) and the UK (Sellafield) is not only based on contracts concluded by the German electric utilities and the French COGEMA or the British BNFL, but has been agreed as well by an exchange of diplomatic notes between the French Ministry of Foreign Affairs and the German ambassador in Paris, the German Foreign Ministry and the French ambassador as well as the British ambassador in Bonn. The article therefore first examines from the angle of international law the legal obligations binding the states involved, and Germany in particular, in matters of spent fuel reprocessing contracts. The next question arising in this context and discussed by the article is that of whether and how much indemnification can be demanded by the reprocessing companies, or their governments, resp., if Germany should discontinue spent fuel reprocessing and thus might be made liable for breach of the bilateral agreements. (orig/CB) [de

  11. Simplified probabilistic risk assessment in fuel reprocessing

    International Nuclear Information System (INIS)

    Solbrig, C.W.

    1993-01-01

    An evaluation was made to determine if a backup mass tracking computer would significantly reduce the probability of criticality in the fuel reprocessing of the Integral Fast Reactor. Often tradeoff studies, such as this, must be made that would greatly benefit from a Probably Risk Assessment (PRA). The major benefits of a complete PRA can often be accrued with a Simplified Probabilistic Risk Assessment (SPRA). An SPRA was performed by selecting a representative fuel reprocessing operation (moving a piece of fuel) for analysis. It showed that the benefit of adding parallel computers was small compared to the benefit which could be obtained by adding parallelism to two computer input steps and two of the weighing operations. The probability of an incorrect material moves with the basic process is estimated to be 4 out of 100 moves. The actual values of the probability numbers are considered accurate to within an order of magnitude. The most useful result of developing the fault trees accrue from the ability to determine where significant improvements in the process can be made. By including the above mentioned parallelism, the error move rate can be reduced to 1 out of 1000

  12. Fuel reprocessing: Citizens' questions and experts' answers

    International Nuclear Information System (INIS)

    1982-10-01

    In connection with the intention of DWK to erect a fuel reprocessing plant in the Oberpfalz, citizens have asked a great number of questions which are of interest to the general public. They have been collected, grouped into subject categories and answered by experts. (orig./HSCH) [de

  13. Recent R/D towards aqueous reprocessing of FBR fuels

    Energy Technology Data Exchange (ETDEWEB)

    Mallika, C.; Pandey, N.K.; Kumar, S.; Kamachi Mudali, U. [Materials, Process and Equipment Development Group, Indira Gandhi Centre for Atomic Research, Kalpakkam 603102 (India)

    2016-07-01

    The mixed Pu-rich carbide spent fuel with a burn up of 155 GWd/t from the Fast Breeder Test Reactor is being reprocessed in a hot-cell facility by PUREX process. Based on the input from the operation of this facility, research and development activities were carried out to improve the recovery, decontamination factors, economy and to reduce the waste volumes. Reduction of uranyl ions in a continuous flow electrochemical reactor and electrolytic as well as chemical reduction of 4 M HNO{sub 3} from liquid waste could be performed in continuous mode. Using the optimized parameters, suitable electrolytic cells/experimental setups were designed for the plant capacity of 6 L/h. Studies on the extraction kinetics of Ru with 30% TBP (tributyl phosphate) in NPH revealed that better decontamination factor with respect to Ru can be achieved using fast contactors like centrifugal extractors (CEs). Towards developing a spent solvent recovery system to reduce organic waste volumes, a pilot plant was set up, which could recover diluent as top product of distillation column and 40% TBP as bottom product from inactive degraded solvent. A solvent recovery system using short path distillation was also developed for installation in hot cells. (authors)

  14. Remote maintenance in TOR fast reactor fuel reprocessing facility

    International Nuclear Information System (INIS)

    Eymery, R.; Constant, M.; Malterre, G.

    1986-11-01

    The TOR facility which is undergoing commissioning tests has a capacity of 5 T. HM/year which is enough for reprocessing all the Phenix fuel, with an excess capacity which is to be used for other fast reactors fuels. It is the result of enlargement and renovation of the old Marcoule pilot facility. A good load factor is expected through the use of equipment with increased reliability and easy maintenance. TOR will also be used to test new equipment developed for the large breeder fuel reprocessing plant presently in the design stage. The latter objective is specifically important for the parts of the plant involving mechanical equipment which are located in a new building: TOR 1. High reliability and flexibility will be obtained in this building thanks to the attention given to the integrated remote handling system [fr

  15. Characteristics of potential repository wastes. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1992-07-01

    The LWR spent fuels discussed in Volume 1 of this report comprise about 99% of all domestic non-reprocessed spent fuel. In this report we discuss other types of spent fuels which, although small in relative quantity, consist of a number of diverse types, sizes, and compositions. Many of these fuels are candidates for repository disposal. Some non-LWR spent fuels are currently reprocessed or are scheduled for reprocessing in DOE facilities at the Savannah River Site, Hanford Site, and the Idaho National Engineering Laboratory. It appears likely that the reprocessing of fuels that have been reprocessed in the past will continue and that the resulting high-level wastes will become part of defense HLW. However, it is not entirely clear in some cases whether a given fuel will be reprocessed, especially in cases where pretreatment may be needed before reprocessing, or where the enrichment is not high enough to make reprocessing attractive. Some fuels may be canistered, while others may require special means of disposal. The major categories covered in this chapter include HTGR spent fuel from the Fort St. Vrain and Peach Bottom-1 reactors, research and test reactor fuels, and miscellaneous fuels, and wastes generated from the decommissioning of facilities.

  16. Status of reprocessing technology in the HTGR fuel cycle

    International Nuclear Information System (INIS)

    Kaiser, G.; Merz, E.; Zimmer, E.

    1977-01-01

    For more than ten years extensive R and D work has been carried out in the Federal Republic of Germany in order to develop the technology necessary for closing the fuel cycle of high-temperature gas-cooled reactors. The efforts are concentrated primarily on fuel elements having either highly enriched 235 U or recycled 233 U as the fissile and thorium as the fertile material embedded in a graphite matrix. They include the development of processes and equipment for reprocessing and remote preparation of coated microspheres from the recovered uranium. The paper reviews the issues and problems associated with the requirements to deal with high burn-up fuel from HTGR's of different design and composition. It is anticipated that a grind-burn-leach head-end treatment and a modified THOREX-type chemical processing are the optimum choice for the flowsheet. An overview of the present status achieved in construction of a small reprocessing facility, called JUPITER, is presented. It includes a discussion of problems which have already been solved and which have still to be solved like the treatment of feed/breed particle systems and for minimizing environmental impacts envisaged with a HTGR fuel cycle technology. Also discussed is the present status of remote fuel kernel fabrication and coating technology. Additional activities include the design of a mock-up prototype burning head-end facility, called VENUS, with a throughput equivalent to about 6000 MW installed electrical power, as well as a preliminary study for the utilisation of the Karlsruhe LWR prototype reprocessing plant (WAK) to handle HTGR fuel after remodelling of the installations. The paper concludes with an outlook of projects for the future

  17. On-Line Monitoring for Control and Safeguarding of Radiochemical Streams at Spent Fuel Reprocessing Plant

    International Nuclear Information System (INIS)

    Bryan, Samuel A.; Levitskaia, Tatiana G.; Billing, Justin M.; Casella, Amanda J.; Johnsen, Amanda M.; Peterson, James M.

    2009-01-01

    Advanced techniques enabling enhanced safeguarding of the spent fuel reprocessing plants are urgently needed. Our approach is based on prerequisite that real time monitoring of the solvent extraction flowsheets provides unique capability to quickly detect unwanted manipulations with fissile isotopes present in the radiochemical streams during reprocessing activities. The methods used to monitor these processes must be robust and must be able to withstand harsh radiation and chemical environments. A new on-line monitoring system satisfying these requirements and featuring Raman spectroscopy combined with a Coriolis and conductivity probes, has been recently developed by our research team. It provides immediate chemical data and flow parameters of high-level radioactive waste streams with high brine content generated during retrieval activities from Hanford nuclear waste storage tanks. The nature of the radiochemical streams at the spent fuel reprocessing plant calls for additional spectroscopic information, which can be gained by the utilization of UV-vis-NIR capabilities. Raman and UV-vis-NIR spectroscopies are analytical techniques that have extensively been extensively applied for measuring the various organic and inorganic compounds including actinides. The corresponding spectrometers used under the laboratory conditions are easily convertible to the process-friendly configurations allowing remote measurements under the flow conditions. A fiber optic Raman probe allows monitoring of the high concentration species encountered in both aqueous and organic phases within the UREX suite of flowsheets, including metal oxide ions, such as uranyl, components of the organic solvent, inorganic oxo-anions, and water. The actinides and lanthanides are monitored remotely by UV-vis-NIR spectroscopy in aqueous and organic phases. In this report, we will present our recent results on spectroscopic measurements of simulant flowsheet solutions and commercial fuels available at

  18. Ecological risk of reprocessing of uranium wastes of the Gafurov's tailing pit

    International Nuclear Information System (INIS)

    Khakimov, N.; Nazarov, Kh.M.; Kamalov, D.D.; Mirsaidov, U.M.

    2010-01-01

    Present article is devoted to assessment ecological risk of reprocessing of uranium wastes of the Gafurov's tailing pit. Authors set as their purpose the investigation of ecological risk of reprocessing of uranium wastes of the Gafurov-city's tailing pit. Having carried out their investigations, the authors came to the conclusion that the effect of radon gas during reprocessing to workers and specialists is minimal if they follow all the required safety rules.

  19. Roles of programmable logic controllers in fuel reprocessing plants

    International Nuclear Information System (INIS)

    Mishra, Hrishikesh; Balakrishnan, V.P.; Pandya, G.J.

    1999-01-01

    Fuel charging facility is another application of Programmable Logic Controllers (PLC) in fuel reprocessing plants, that involves automatic operation of fuel cask dolly, charging motor, pneumatic doors, clutches, clamps, stepper motors and rod pushers in a pre-determined sequence. Block diagram of ACF system is given for underlining the scope of control and interlocks requirements involved for automation of the fuel charging system has been provided for the purpose at KARP Plant, Kalpakkam

  20. Environmental aspects of commercial radioactive waste management

    Energy Technology Data Exchange (ETDEWEB)

    1979-05-01

    Environmental effects (including accidents) associated with facility construction, operation, decommissioning, and transportation in the management of commercially generated radioactive waste were analyzed for plants and systems assuming a light water power reactor scenario that produces about 10,000 GWe-yr through the year 2050. The following alternative fuel cycle modes or cases that generate post-fission wastes requiring management were analyzed: a once-through option, a fuel reprocessing option for uranium and plutonium recycle, and a fuel reprocessing option for uranium-only recycle. Volume 1 comprises five chapters: introduction; summary of findings; approach to assessment of environmental effects from radioactive waste management; environmental effects related to radioactive management in a once-through fuel cycle; and environmental effects of radioactive waste management associated with an LWR fuel reprocessing plant. (LK)

  1. Environmental aspects of commercial radioactive waste management

    International Nuclear Information System (INIS)

    1979-05-01

    Environmental effects (including accidents) associated with facility construction, operation, decommissioning, and transportation in the management of commercially generated radioactive waste were analyzed for plants and systems assuming a light water power reactor scenario that produces about 10,000 GWe-yr through the year 2050. The following alternative fuel cycle modes or cases that generate post-fission wastes requiring management were analyzed: a once-through option, a fuel reprocessing option for uranium and plutonium recycle, and a fuel reprocessing option for uranium-only recycle. Volume 1 comprises five chapters: introduction; summary of findings; approach to assessment of environmental effects from radioactive waste management; environmental effects related to radioactive management in a once-through fuel cycle; and environmental effects of radioactive waste management associated with an LWR fuel reprocessing plant

  2. Challenges associated with extending spent fuel storage until reprocessing or disposal

    International Nuclear Information System (INIS)

    Carlsen, Brett; Saegusa, Toshiari; Wasinger, Karl; Grahn, Per; Wolff, Dietmar; Waters, Michael; Bevilacqua, Arturo

    2014-01-01

    Existing spent fuel storage (SFS) practices are the result of the past presumptions that an end point, e.g. sufficient reprocessing and/or disposal capacity, would be available within the short term (approximately 50 years). Consequently, long term storage (between approximately 50 and 100 years) considerations have not been included in planning the back end of the nuclear fuel cycle. The present reality shows that no country has yet neither licensed nor built nor operated a deep geological repository for spent fuel (SF) and/or high level waste (HLW). Further, present and projected SF generation rates - more than 10 000 metric tons of heavy metal (MTHM) a year - far exceed the current capacity for disposal - 0 MTHM - or reprocessing - 4 800 MTHM a year - and will continue to do so for the rest of this decade. As a result, the SFS periods will extend. Moreover, as the SFM end point - reprocessing and/or disposal - is not presently defined with certainty in most countries, SFS periods will extend over periods within or beyond the long term in those countries. The IAEA has started in October 2010 a programmatic activity to consider challenges associated with extending SFS durations. After four consultants meetings and two technical meetings, a need has been identified for a SFS framework based on renewable storage periods - with as many renewals as may be needed - to ensure safe and secure SFS until sufficient reprocessing and/or disposal capacity is implemented. Over the course of the technical meetings, the consultants have worked with delegates of 36 Member States and 2 International Organizations to emphasize the importance of establishing programs that can provide sufficient confidence that age-related degradation will be recognized and addressed to effectively prevent unacceptable consequences. This paper considers a number of topics from the perspective of assuring safe and effective SFS as storage periods extend including: SFS concepts, packaging of SF

  3. Reprocessing of irradiated fuel: pros and cons

    International Nuclear Information System (INIS)

    Lebedev, O.G.; Novikov, V.M.

    1991-01-01

    The acceptable-safety nuclear reactors (APWR, LMFBR, MSBR, MSCR) can be provided by the enrichment industry and by plutonium reserves. But steady accumulation of spent fuel will inevitably make to return to the problems of fuel recycle. PUREX-processing increases a danger of radionuclides spreading due to the presence of large buffer tanks. Using of compact fluoride - volatility process will sharply reduce a nuclide leakage likewise permit to reprocess a fuel with a burnup as high as possible. Success of a powerful robots development give an opportunity to design a fluoride-volatility plant twice cheaper than PUREX. (author)

  4. A comprehensive fuel nuclide analysis at the reprocessing plant

    International Nuclear Information System (INIS)

    Arenz, H.J.; Koch, L.

    1983-01-01

    The composition of spent fuel can be determined by various methods. They rely partially on different information. Therefore the synopsis of the results of all methods permits a detection of systematic errors and their explanation. Methods for determining the masses of fuel nuclides at the reprocessing input point range from pure calculations (shipper data) to mere experimental determinations (volumetric analysis). In between, a mix of ''fresh'' experimental results and ''historical'' data is used to establish a material balance. Deviations in the results obtained by the individual methods can be attributed to the information source, which is unique for the method in question. The methodology of the approach consists of three steps: by paired comparison of the operator analysis (usually volumetric or gravimetric) with remeasurements the error components are determined on a batch-by-batch basis. Using the isotope correlation technique the operator data as well as the remeasurements are checked on an inter-batch basis for outliers, precision and bias. Systematic errors can be uncovered by inter-lab comparison of remeasurements and confirmed by using historical information. Experience collected during the reprocessing of LWR fuel at two reprocessing plants prove the flexibility and effectiveness of this approach. An example is presented to demonstrate its capability in detecting outliers and determining systematic errors. (author)

  5. Waste management analysis for the nuclear fuel cycle. I. Actinide recovery from aqueous salt wastes

    International Nuclear Information System (INIS)

    Martella, L.L.; Navratil, J.D.

    1979-01-01

    A preliminary feasibility study of solvent extraction methods has been completed for removing actinides from selected salt wastes likely to be produced during reactor fuel fabrication and reprocessing. The use of a two-step solvent extraction system, tributyl phosphate (TBP) followed by a bidentate organophosphorus extractant (DHDECMP), appears most efficient for removing actinides from salt waste. The TBP step would remove most of the plutonium and >99.99% of the uranium. The second step, using DHDECMP, would remove >99.91% of the americium, the remaining plutonium (>99.98%), and other actinides from the acidified salt waste

  6. Development on nuclear fuel cycle business in Japan

    International Nuclear Information System (INIS)

    Usami, Kogo

    2002-01-01

    The Japan Nuclear Fuel Co., Ltd. (JNF) develops five businesses on nuclear fuel cycle such as uranium concentration, storage and administration of high level radioactive wastes, disposition of low level radioactive wastes, used fuel reprocessing, MOX fuel, at Rokkasho-mura in Aomori prefecture. Here were introduced on outline, construction and operation in reprocessing and MOX fuel works, outline, present state and future subjects on technical development of uranium concentration, outline and safety of disposition center on low level radioactive wastes, and storage and administration of high level radioactive wastes. (G.K.)

  7. Releases of radioiodine from the Karlsruhe nuclear fuel reprocessing plant as a result of spontaneous fission of actinides

    International Nuclear Information System (INIS)

    Schuettelkopf, H.

    1977-02-01

    Fro, 23,7,1976 to 28.7.76 and from 8.3.76 to 9.16.76 50 pCi 131 I/m 3 , 116 pCi 133 I/m 3 und 195 pCi 135 I/m 3 were measured on an average in 11 samples of waste air from the Karlsruhe Nuclear Fuel Reprocessing Plant (WAK). During these time intervals no dissolution of fuel material was performed. From 16.9.76 to 27.10.76 18 charges of nuclear fuel were dissolved. During this period 3.3 pCi 131 I/m 3 and 7.9 pCi 133 I/m 3 were obtained as mean waste air concentrations which were higher than the lower detection limit of the method of measurement used. 244 Cm, 242 Cm, 242 Pu, 240 Pu and 238 Pu are responsible for the production of radioiodine in nuclear fuel by spontaneous fission. 244 Cm is the most important nuclide in highly active waste solutions (HAL). The cumulative fission yield is well approximated by 3% for 13 I and by 6% for 133 I. The radioiodine is set free during fuel dissolution by venting of tanks and HAL pipes and during the vritification of such solutions. The radioiodine produced by spontaneous fission is released from WAK only by venting of tanks and HAL pipes. Corresponding to the conditions of venting, air concentrations as high as 4.4 pCi 131 I/m 3 and 8.2 pCi 133 I/m 3 are expected. These concentrations agree well with air concentrations measured during the period of fuel dissolution. Based on plausible assumptions the 131 I and 133 I waste air concentrations for the period of outage are calculated from an evaporated volume of HAL in the pipes corresponding to about 10 g of 244 Cm and with 40% equilibrium between I 2 in evaporated HAL and in waste air. In the worst case 131 I-concentrations in the waste air of WAK result in an annual release of 0.2 mCi 131 I. This value is less than 1% of the authorized annual releases of 1976. For a reprocessing plant of 1,400 t/a capacity the annual expected release of 131 I lies in the mCi range. (orig.) [de

  8. Disposal of Canada's nuclear fuel waste

    International Nuclear Information System (INIS)

    Dormuth, K.W.; Nuttall, K.

    1994-01-01

    In 1978, the governments of Canada and Ontario established the Nuclear Fuel Waste Management program. As of the time of the conference, the research performed by AECL was jointly funded by AECL and Ontario Hydro through the CANDU owners' group. Ontario Hydro have also done some of the research on disposal containers and vault seals. From 1978 to 1992, AECL's research and development on disposal cost about C$413 million, of which C$305 was from funds provided to AECL by the federal government, and C$77 million was from Ontario Hydro. The concept involves the construction of a waste vault 500 to 1000 metres deep in plutonic rock of the Canadian Precambrian Shield. Used fuel (or possibly solidified reprocessing waste) would be sealed into containers (of copper, titanium or special steel) and emplaced (probably in boreholes) in the vault floor, surrounded by sealing material (buffer). Disposal rooms might be excavated on more than one level. Eventually all excavated openings in the rock would be backfilled and sealed. Research is organized under the following headings: disposal container, waste form, vault seals, geosphere, surface environment, total system, assessment of environmental effects. A federal Environmental Assessment Panel is assessing the concept (holding public hearings for the purpose) and will eventually make recommendations to assist the governments of Canada and Ontario in deciding whether to accept the concept, and how to manage nuclear fuel waste. 16 refs., 1 tab., 3 figs

  9. The nuclear fuel cycle, From the uranium mine to waste disposal

    International Nuclear Information System (INIS)

    2002-09-01

    Fuel is a material that can be burnt to provide heat. The most familiar fuels are wood, coal, natural gas and oil. By analogy, the uranium used in nuclear power plants is called 'nuclear fuel', because it gives off heat too, although, in this case, the heat is obtained through fission and not combustion. After being used in the reactor, spent nuclear fuel can be reprocessed to extract recyclable energy material, which is why we speak of the nuclear fuel cycle. This cycle includes all the following industrial operations: - uranium mining, - fuel fabrication, - use in the reactor, - reprocessing the fuel unloaded from the reactor, - waste treatment and disposal. 'The nuclear fuel cycle includes an array of industrial operations, from uranium mining to the disposal of radioactive waste'. Per unit or mass (e.g. per kilo), nuclear fuel supplies far more energy than a fossil fuel (coal or oil). When used in a pressurised water reactor, a kilo of uranium generates 10,000 times more energy than a kilo of coal or oil in a conventional power station. Also, the fuel will remain in the reactor for a long time (several years), unlike conventional fuels, which are burnt up quickly. Nuclear fuel also differs from others in that uranium has to undergo many processes between the time it is mined and the time it goes into the reactor. For the sake of simplicity, the following pages will only look at nuclear fuel used in pressurised water reactors (or PWRs), because nuclear power plants consisting of one or more PWRs are the most widely used around the world. (authors)

  10. Spent fuel handling and storage facility for an LWR fuel reprocessing plant

    International Nuclear Information System (INIS)

    Baker, W.H.; King, F.D.

    1979-01-01

    The facility will have the capability to handle spent fuel assemblies containing 10 MTHM/day, with 30% if the fuel received in legal weight truck (LWT) casks and the remaining fuel received in rail casks. The storage capacity will be about 30% of the annual throughput of the reprocessing plant. This size will provide space for a working inventory of about 50 days plant throughput and empty storage space to receive any fuel that might be in transit of the reprocessing plant should have an outage. Spent LWR fuel assemblies outside the confines of the shipping cask will be handled and stored underwater. To permit drainage, each water pool will be designed so that it can be isolated from the remaining pools. Pool water quality will be controlled by a filter-deionizer system. Radioactivity in the water will be maintained at less than or equal to 2 x 10 -4 Ci/m 3 ; conductivity will be maintained at 1 to 2 μmho/cm. The temperature of the pool water will be maintained at less than or equal to 40 0 C to retard algae growth and reduce evaporation. Decay heat will be transferred to the environment via a heat exchanger-cooling tower system

  11. Reprocessing of nuclear fuels

    International Nuclear Information System (INIS)

    Hatfield, G.W.

    1960-11-01

    One of the persistent ideas concerning nuclear power is that the fuel costs are negligible. This, of course, is incorrect and, in fact, one of the major problems in the development of economic nuclear power is to get the cost of the fuel cycles down to an acceptable level. The irradiated fuel removed from the nuclear power reactors must be returned as fresh fuel into the system. Aside from the problems of handling and shipping involved in the reprocessing cycles, the two major steps are the chemical separation and the refabrication. The chemical separation covers the processing of the spent fuel to separate and recover the unburned fuel as well as the new fuel produced in the reactor. This includes the decontamination of these materials from other radioactive fission products formed in the reactor. Refabrication involves the working and sheathing of recycled fuel into the shapes and forms required by reactor design and the economics of the fabrication problem determines to a large extent the quality of the material required from the chemical treatment. At present there appear to be enough separating facilities in the United States and the United Kingdom to handle the recycling of fuel from power reactors for the next few years. However, we understand the costs of recycling fuel in these facilities will be high or low depend ing on whether or not the capital costs of the plant are included in the processing cost. Also, the present plants may not be well adapted to carry out the chemical processing of the very wide variety of power reactor fuel elements which are being considered and will continue to be considered over the years to come. (author)

  12. The transport of irradiated fuel. An activity closely related to reprocessing

    International Nuclear Information System (INIS)

    Lenail, B.; Curtis, H.W.

    1987-01-01

    With a proven reprocessing capacity of 400 tonnes of uranium per year and the rapid expansion of this capacity, the need to feed the reprocessing plants at La Hague has become vital to ensure continuous and economic reprocessing. The programming of transports by the reprocessor and transporter to ensure a constant supply of fuel for reprocessing has therefore become increasingly important. These transports use the public roads and the railway system and the reprocessor and transporter must cooperate in maintaining the highest possible standards of safety. Safety must take priority over all other factors, including the economics of the operation

  13. Reprocessing business in the UK

    Energy Technology Data Exchange (ETDEWEB)

    Wilkinson, W L

    1985-01-01

    The development of the process for separating uranium, plutonium and fission products from irradiated fuel began in Britain in late 1940s, and the first separation plant was operated at Sellafield in 1952. This plant was operated very well for more than 12 years with the overall availability over 95%. The second separation plant to meet the needs of the growing nuclear power program became operational in 1964. This plant has been extremely successful, but the significant improvement was made to extend the operating life of the key items. In mid 1970s, by the introduction of uranium oxide fuel reactors, significant reprocessing capacity became to be required. Therefore, it was decided to embark upon the development of a thermal oxide reprocessing plant (THORP) to complement the existing facilities at Sellafield. The THORP is a very large complex of plants. The first duty for the THORP is to reprocess 6,000 t U of oxide fuel in 10 years. But the plant is designed for the life of 25 years. The plant has the capacity of 1200 tes/year. The scope covered by the THORP, the plant processes and the wastes produced from the THORP are described. (Kako, I.).

  14. Vitrifiable concrete for disposal of spent nuclear fuel reprocessing waste at I.N.E.L

    International Nuclear Information System (INIS)

    Gougar, M.L.D.; Scheetz, B.E.; Siemer, D.D.

    1996-01-01

    A cement capable of being Hot Isostatically Pressed (HIP'ed) into a glass-ceramic has been proposed for use as the waste form for SNF reprocessing wastes at the Idaho National Engineering Laboratories. Such an ''intermediate'' cement, with a composition based on that of common glasses, has been designed and tested. The cement formulations included mixed I.N.E.L. wastes, blast furnace flag, reactive silica, alumina, and I.N.E.L. soil or vermiculite, which was activated with potassium or sodium hydroxide. Modified FUETAP processing was performed and the cement was subsequently characterized. Results of compressive strength testing ranged from 1,452 psi to 4,163 psi, exceeding the NRC-suggested standard of >500 psi. Total dissolved solids concentrations in waste form leachates were calculated from a static leach test in which leachate conductivity was measured. Effective diffusivities for radioisotopes Cs and Sr were calculated from leachate analysis data. Diffusivity values were on the order of 10 -15 to 10 -10 cm 2 /sec, which compare favorably with diffusivities in other materials

  15. Problems with military nuclear waste

    International Nuclear Information System (INIS)

    Lawless, W.F.

    1985-01-01

    Spent fuel elements contain the largest amount of radioactivity, but commercial spent fuel is not presently being reprocessed in the US, so the wastes are left contained within spent fuel assemblies and are not immediately accessible to the environment. By reprocessing military spent fuel to separate plutonium and unspent uranium from the highly radioactive and high-heat fission product waste, known as high-level waste (99.5% fission products and about 0.5% plutonium and uranium), nuclear weapons manufacture produces more dangerous radioactive wastes than do current commercial processes. The Department of Energy standards should be subject to an environmental impact study. 27 references

  16. Remotex and servomanipulator needs in nuclear fuel reprocessing plants

    International Nuclear Information System (INIS)

    Garin, J.

    1981-01-01

    Work on the conceptual design of a pilot-scale plant for reprocessing breeder reactor fuels is being performed at Oak Ridge National Laboratory. The plant design will meet all current federal regulations for repocessing plants and will serve as prototype for future production plants. A unique future of the concept is the incorporation of totally remote operation and maintenance of the process equipment within a large barn-like hot cell. This approach, caled Remotex, utilizes servomanipulators coupled with television viewing to extend man's capabilities into the hostile cell environment. The Remotex concept provides significant improvements for fuel reprocessing plants and other nuclear facilities in the areas of safeguarding nuclear materials, reducing radiation exposure, improving plant availability, recovering from unplanned events, and plant decommissioning

  17. Disposal of spent fuel

    International Nuclear Information System (INIS)

    Blomeke, J.O.; Ferguson, D.E.; Croff, A.G.

    1978-01-01

    Based on preliminary analyses, spent fuel assemblies are an acceptable form for waste disposal. The following studies appear necessary to bring our knowledge of spent fuel as a final disposal form to a level comparable with that of the solidified wastes from reprocessing: 1. A complete systems analysis is needed of spent fuel disposition from reactor discharge to final isolation in a repository. 2. Since it appears desirable to encase the spent fuel assembly in a metal canister, candidate materials for this container need to be studied. 3. It is highly likely that some ''filler'' material will be needed between the fuel elements and the can. 4. Leachability, stability, and waste-rock interaction studies should be carried out on the fuels. The major disadvantages of spent fuel as a disposal form are the lower maximum heat loading, 60 kW/acre versus 150 kW/acre for high-level waste from a reprocessing plant; the greater long-term potential hazard due to the larger quantities of plutonium and uranium introduced into a repository; and the possibility of criticality in case the repository is breached. The major advantages are the lower cost and increased near-term safety resulting from eliminating reprocessing and the treatment and handling of the wastes therefrom

  18. Issues for Conceptual Design of AFCF and CFTC LWR Spent Fuel Separations Influencing Next-Generation Aqueous Fuel Reprocessing

    International Nuclear Information System (INIS)

    D. Hebditch; R. Henry; M. Goff; K. Pasamehmetoglu; D. Ostby

    2007-01-01

    In 2007, the U.S. Department of Energy (DOE) published the Global Nuclear Energy Partnership (GNEP) strategic plan, which aims to meet US and international energy, safeguards, fuel supply and environmental needs by harnessing national laboratory R and D, deployment by industry and use of international partnerships. Initially, two industry-led commercial scale facilities, an advanced burner reactor (ABR) and a consolidated fuel treatment center (CFTC), and one developmental facility, an advanced fuel cycle facility (AFCF) are proposed. The national laboratories will lead the AFCF to provide an internationally recognized R and D center of excellence for developing transmutation fuels and targets and advancing fuel cycle reprocessing technology using aqueous and pyrochemical methods. The design drivers for AFCF and the CFTC LWR spent fuel separations are expected to impact on and partly reflect those for industry, which is engaging with DOE in studies for CFTC and ABR through the recent GNEP funding opportunity announcement (FOA). The paper summarizes the state-of-the-art of aqueous reprocessing, gives an assessment of engineering drivers for U.S. aqueous processing facilities, examines historic plant capital costs and provides conclusions with a view to influencing design of next-generation fuel reprocessing plants

  19. Nuclear waste disposal: technology and environmental hazards

    International Nuclear Information System (INIS)

    Hare, F.K.; Aikin, A.M.

    1980-01-01

    The subject is discussed under the headings: introduction; the nature and origin of wastes (fuel cycles; character of wastes; mining and milling operations; middle stages; irradiated fuel; reprocessing (waste generation); reactor wastes); disposal techniques and disposal of reprocessing wastes; siting of repositories; potential environmental impacts (impacts after emplacement in a rock repository; catastrophic effects; dispersion processes (by migrating ground water); thermal effects; future security; environmental survey, monitoring and modelling); conclusion. (U.K.)

  20. Krypton-85 health risk assessment for a nuclear fuel reprocessing plant

    International Nuclear Information System (INIS)

    Mellinger, P.J.; Brackenbush, L.W.; Tanner, J.E.; Gilbert, E.S.

    1984-08-01

    The risks involved in the routine release of 85 Kr from nuclear fuel reprocessing operations to the environment were compared to those resulting from the capture and storage of 85 Kr. Instead of releasing the 85 Kr to the environment when fuel is reprocessed, it can be captured, immobilized and stored. Two alternative methods of capturing 85 Kr (cryogenic distillation and fluorocarbon absorption) and one method of immobilizing the captured gas (ion implantation/sputtering) were theoretically incorporated into a representative fuel reprocessing plant, the Barnwell Nuclear Fuel Plant, even though there are no known plans to start up this facility. Given the uncertainties in the models used to generate lifetime risk numbers (0.02 to 0.027 radiation induced fatal cancers expected in the occupational workforce and 0.017 fatal cancers in the general population), the differences in total risks for the three situations, (i.e., no-capture and two-capture alternatives) cannot be considered meaningful. It is possible that no risks would occur from any of the three situations. There is certainly no reason to conclude that risks from 85 Kr routinely released to the environment are greater than those that would result from the other two situations considered. Present regulations mandate recovery and disposal of 85 Kr from the off gases of a facility reprocessing spent fuel from commercial sources. Because of the lack of a clear-cut indication that recovery woud be beneficial, it does not seem prudent to burden the facilities with a requirement for 85 Kr recovery, at least until operating experience demonstrates the incentive. The probable high aging of the early fuel to be processed and the higher dose resulting from the release of the unregulated 3 H and 14 C also encourage delaying implementation of the 85 Kr recovery in the early plants

  1. Evaluation of methods for seismic analysis of nuclear fuel reprocessing plants, part 1

    International Nuclear Information System (INIS)

    Tokarz, F.J.; Murray, R.C.; Arthur, D.F.; Feng, W.W.; Wight, L.H.; Zaslawsky, M.

    1975-01-01

    Currently, no guidelines exist for choosing methods of structural analysis to evaluate the seismic hazard of nuclear fuel reprocessing plants. This study examines available methods and their applicability to fuel reprocessing plant structures. The results of this study should provide a basis for establishing guidelines recommending methods of seismic analysis for evaluating future fuel reprocessing plants. The approach taken is: (1) to identify critical plant structures and place them in four categories (structures at or near grade; deeply embedded structures; fully buried structures; equipment/vessels/attachments/piping), (2) to select a representative structure in each of the first three categories and perform static and dynamic analysis on each, and (3) to evaluate and recommend method(s) of analysis for structures within each category. The Barnwell Nuclear Fuel Plant is selected as representative of future commercial reprocessing plants. The effect of site characteristics on the structural response is also examined. The response spectra method of analysis combined with the finite element model for each category is recommended. For structures founded near or at grade, the lumped mass model could also be used. If a time history response is required, a time-history analysis is necessary. (U.S.)

  2. Nuclear waste management in West Germany - the battle continues

    International Nuclear Information System (INIS)

    Hirsch, H.

    1983-01-01

    A detailed account is given of recent technical and political activities in West Germany in connexion with nuclear waste management - plans for reprocessing plant, storage and final disposal. Headings are: historical and organizational introduction; waste disposal concept (including political activities of federal and state governments); the Gorleben Hearing (concerning reprocessing); the consequences of political and scientific opposition; reprocessing makes a fast come-back 1980-1983; new concepts - new risks (proposals for spent fuel storage and reprocessing); reprocessing experience; new toxicity (reference to ICRP-30); why reprocessing; intermediate storage of spent fuel and other wastes; development of final disposal 1979 to 1983 (particular reference to Gorleben salt dome); safety of final disposal - the million-year-gamble. (U.K.)

  3. Identification of potential safety-related incidents applicable to a breeder fuel reprocessing plant

    International Nuclear Information System (INIS)

    Perkins, W.C.

    1980-01-01

    The current emphasis on safety in all phases of the nuclear fuel cycle requires that safety features be identified and included in designs of nuclear facilities at the earliest possible stage. A popular method for the early identification of these safety features is the Preliminary Hazards Analysis. An extension of this analysis is to illustrate the nature of a hazard by its effects in accident situations, that is, to identify what are called safety-related incidents. Some useful tools are described which have been used at the Savannah River Laboratory, SRL, to make Preliminary Hazards Analyses as well as safety analyses of facilities for processing spent nuclear fuels from both power and production reactors. These tools have also been used in safety studies of waste handling operations at the Savannah River Plant. The tools are the SRL Incidents Data Bank and the What If meeting. The application of this methodology to a proposed facility which has breeder fuel reprocessing capability, the Hot Experimental Facility (HEF) is illustrated

  4. Overview of HTGR fuel recycle

    International Nuclear Information System (INIS)

    Notz, K.J.

    1976-01-01

    An overview of HTGR fuel recycle is presented, with emphasis placed on reprocessing and fuel kernel refabrication. Overall recycle operations include (1) shipment and storage, (2) reprocessing, (3) refabrication, (4) waste handling, and (5) accountability and safeguards

  5. Collection of lectures given on the occasion of the 5th status report of the project of reprocessing and waste treatment

    International Nuclear Information System (INIS)

    1984-09-01

    10 years of R and D work in retrospect with the emphasis being on the development of electrochemical processes for fuel reprocessing (1B-EMMA and 2B-EMMA), vitrification of high-activity wastes by remote control (PAMELA, WA-350), iodine filter development, wet incineration of α-activity wastes, Pu recycling (ALONA), improvement of the chemical flow charts in the planning of the WA-350. Such developments are complemented by processes applied at the HDB. (DG) [de

  6. The validation of waste assay systems during active test at Rokkasho Reprocessing Plant

    International Nuclear Information System (INIS)

    Tamura, Takayuki; Miura, Yasushi; Iwamoto, Tomonori

    2007-01-01

    In order to implement accurate material accountancy at Rokkasho Reprocessing Plant (RRP) as a large scale reprocessing plant, it is necessary to introduce accurate measurement systems not only for mainstream material, but also appropriate measurement systems for solid waste materials. In this sense, the generated wastes by the active test operation have been measured with the Non-Destructive Assay Systems, such as Rokkasho Hulls Measurement System (RHMS) and Waste Crate Assay System (WCAS) for accountancy. This paper describes the experience of the NDA operation and the evaluation results for accountancy. (author)

  7. Simulation of facility operations and materials accounting for a combined reprocessing/MOX fuel fabrication facility

    International Nuclear Information System (INIS)

    Coulter, C.A.; Whiteson, R.; Zardecki, A.

    1991-01-01

    We are developing a computer model of facility operations and nuclear materials accounting for a facility that reprocesses spent fuel and fabricates mixed oxide (MOX) fuel rods and assemblies from the recovered uranium and plutonium. The model will be used to determine the effectiveness of various materials measurement strategies for the facility and, ultimately, of other facility safeguards functions as well. This portion of the facility consists of a spent fuel storage pond, fuel shear, dissolver, clarifier, three solvent-extraction stages with uranium-plutonium separation after the first stage, and product concentrators. In this facility area mixed oxide is formed into pellets, the pellets are loaded into fuel rods, and the fuel rods are fabricated into fuel assemblies. These two facility sections are connected by a MOX conversion line in which the uranium and plutonium solutions from reprocessing are converted to mixed oxide. The model of the intermediate MOX conversion line used in the model is based on a design provided by Mike Ehinger of Oak Ridge National Laboratory (private communication). An initial version of the simulation model has been developed for the entire MOX conversion and fuel fabrication sections of the reprocessing/MOX fuel fabrication facility, and this model has been used to obtain inventory difference variance estimates for those sections of the facility. A significant fraction of the data files for the fuel reprocessing section have been developed, but these data files are not yet complete enough to permit simulation of reprocessing operations in the facility. Accordingly, the discussion in the following sections is restricted to the MOX conversion and fuel fabrication lines. 3 tabs

  8. Management of radioactive wastes from nuclear fuels and power plants in Canada

    International Nuclear Information System (INIS)

    Tomlinson, M.; Mayman, S.A.; Tammemagi, H.Y.; Gale, J.; Sanford, B.

    1977-05-01

    The nature of Canadian nuclear fuel and nuclear generating plant radioactive wastes is summarized. Principles of a scheme for disposal of long-lived radioactive wastes deep underground in isolation from man and the biosphere are outlined. The status of the development and construction program is indicated. We have demonstrated incorporation of fission products in solids that in the short term (17 years) dissolve more slowly than plutonium decays. Investigations of long-term stability are in hand. Additional capacity for storage of used fuel prior to reprocessing and disposal is required by 1986 and a preliminary design has been prepared for a pool facility to be located at a central fuel recycling and disposal complex. A demonstration of dry storage of fuel in concrete containers is in progress. The quantities of CANDU generating-station wastes and the principles and methods for managing them are summarized. A radioactive-waste operations site is being developed with several different types of surface storage, each with multiple barriers against leakage. A reactor decommissioning study has been completed. Estimated costs of the various waste management operations are summarized. (author)

  9. Safety aspects of solvent nitration in HTGR fuel reprocessing

    International Nuclear Information System (INIS)

    Wilbourn, R.G.

    1977-06-01

    Reprocessing of HTGR fuels requires evaporative concentration of uranium and thorium nitrate solutions. The results of a bench-scale test program conducted to assess the safety aspects of planned concentrator operations are reported

  10. Improving the Estimates of Waste from the Recycling of Used Nuclear Fuel - 13410

    Energy Technology Data Exchange (ETDEWEB)

    Phillips, Chris; Willis, William; Carter, Robert [EnergySolutions Federal EPC., 2345 Stevens Drive, Richland, WA, 99354 (United States); Baker, Stephen [UK National Nuclear Laboratory, Warrington, Cheshire (United Kingdom)

    2013-07-01

    Estimates are presented of wastes arising from the reprocessing of 50 GWD/tonne, 5 year and 50 year cooled used nuclear fuel (UNF) from Light Water Reactors (LWRs), using the 'NUEX' solvent extraction process. NUEX is a fourth generation aqueous based reprocessing system, comprising shearing and dissolution in nitric acid of the UNF, separation of uranium and mixed uranium-plutonium using solvent extraction in a development of the PUREX process using tri-n-butyl phosphate in a kerosene diluent, purification of the plutonium and uranium-plutonium products, and conversion of them to uranium trioxide and mixed uranium-plutonium dioxides respectively. These products are suitable for use as new LWR uranium oxide and mixed oxide fuel, respectively. Each unit process is described and the wastes that it produces are identified and quantified. Quantification of the process wastes was achieved by use of a detailed process model developed using the Aspen Custom Modeler suite of software and based on both first principles equilibrium and rate data, plus practical experience and data from the industrial scale Thermal Oxide Reprocessing Plant (THORP) at the Sellafield nuclear site in the United Kingdom. By feeding this model with the known concentrations of all species in the incoming UNF, the species and their concentrations in all product and waste streams were produced as the output. By using these data, along with a defined set of assumptions, including regulatory requirements, it was possible to calculate the waste forms, their radioactivities, volumes and quantities. Quantification of secondary wastes, such as plant maintenance, housekeeping and clean-up wastes, was achieved by reviewing actual operating experience from THORP during its hot operation from 1994 to the present time. This work was carried out under a contract from the United States Department of Energy (DOE) and, so as to enable DOE to make valid comparisons with other similar work, a number of

  11. A survey of methods for separating and immobilizing krypton-85 arising from a nuclear fuel reprocessing plant

    International Nuclear Information System (INIS)

    Taylor, P.

    1990-12-01

    This report reviews the literature on methods to separate and immobilize krypton-85 arising from dissolution or prior treatment of nuclear fuel in a reprocessing plant. It was prepared as part of a broader review of fuel reprocessing waste management methods that might find future applications in Canada. Cryogenic distillation is the most fully demonstrated method of separation of krypton from off-gases, but it is complex. In particular, it requires pretreatment of the gas stream to eliminate several other components before the final distillation. The most highly developed alternative process is fluorocarbon adsorption, while several other processes have been investigated on a bench scale. The simplest method of storing radioactive krypton is in compressed-gas cylinders, but the risks of accidental release are increased by the corrosive nature of the decay product, rubidium. Encapsulation in either a metal matrix or a hydrothermally vitrified zeolite appears to offer the most secure immobilization of krypton. Processes for both types of material have been demonstrated inactively on a scale approaching that required for treatment of off-gases from a commercial-scale fuel reprocessing plant. Low-operating temperatures and pressures of the metal encapsulation process, compared with encapsulation in zeolites, represent a definite advantage, but electrical power requirements for the former process are relatively high. It appears that suitable technology is available for separation and immobilization of radioactive krypton, should the need arise in Canada in the future

  12. Waste management as the central task of nuclear energy policy

    International Nuclear Information System (INIS)

    Boehm, H.

    1977-01-01

    A survey article deals with the tasks of the different steps of waste disposal, the amounts of fuel elements and waste obtained and the role of reprocessing in waste management, the intermediate storage of fuel elements and the alternative reprocessing or direct ultimate storage of fuel elements. The present state of the art of large-scale waste management in West Germany, is briefly outlined including responsibilities. (HPH) [de

  13. Waste Incidental to Reprocessing Evaluation for Disposing Saltcake to Saltstone

    International Nuclear Information System (INIS)

    Jones, R.T.

    2002-01-01

    This Waste Incidental to Reprocessing Evaluation is performed in accordance with Department of Energy Order 435.1, Radioactive Waste Management. This evaluation is performed in order to determine whether saltcake currently stored in the Tank Farms, when separated from supernate, meets WIR requirements and can therefore be managed as Low Level Waste and disposed in the Saltstone Production and Disposal Facility in Z-Area

  14. Nuclear engineering questions: power, reprocessing, waste, decontamination, fusion

    International Nuclear Information System (INIS)

    Walton, R.D. Jr.

    1979-01-01

    This volume contains papers presented at the chemical engineering symposium on nuclear questions. Specific questions addressed by the speakers included: nuclear power - why and how; commercial reprocessing - permanent death or resurrection; long-term management of commercial high-level wastes; long-term management of defense high-level waste; decontamination and decommissioning of nuclear facilities, engineering aspects of laser fusion I; and engineering aspects of laser fusion II. Individual papers have been input to the Energy Data Base previously

  15. Status of the nuclear measurement stations for the process control of spent fuel reprocessing at AREVA NC/La Hague

    Energy Technology Data Exchange (ETDEWEB)

    Eleon, Cyrille; Passard, Christian; Hupont, Nicolas; Estre, Nicolas [CEA, DEN, Cadarache, Nuclear Measurement Laboratory, F-13108 St Paul-lez-Durance (France); Battel, Benjamin; Doumerc, Philippe; Dupuy, Thierry; Batifol, Marc [AREVA NC, La Hague plant - Nuclear Measurement Team, F-50444 Beaumont-Hague (France); Grassi, Gabriele [AREVA NC, 1 place Jean-Millier, 92084 Paris-La-Defense cedex (France)

    2015-07-01

    Nuclear measurements are used at AREVA NC/La Hague for the monitoring of spent fuel reprocessing. The process control is based on gamma-ray spectroscopy, passive neutron counting and active neutron interrogation, and gamma transmission measurements. The main objectives are criticality and safety, online process monitoring, and the determination of the residual fissile mass and activities in the metallic waste remained after fuel shearing and dissolution (empty hulls, grids, end pieces), which are put in radioactive waste drums before compaction. The whole monitoring system is composed of eight measurement stations which will be described in this paper. The main measurement stations no. 1, 3 and 7 are needed for criticality control. Before fuel element shearing for dissolution, station no. 1 allows determining the burn-up of the irradiated fuel by gamma-ray spectroscopy with HP Ge (high purity germanium) detectors. The burn-up is correlated to the {sup 137}Cs and {sup 134}Cs gamma emission rates. The fuel maximal mass which can be loaded in one bucket of the dissolver is estimated from the lowest burn-up fraction of the fuel element. Station no. 3 is dedicated to the control of the correct fuel dissolution, which is performed with a {sup 137}Cs gamma ray measurement with a HP Ge detector. Station no. 7 allows estimating the residual fissile mass in the drums filled with the metallic residues, especially in the hulls, from passive neutron counting (spontaneous fission and alpha-n reactions) and active interrogation (fission prompt neutrons induced by a pulsed neutron generator) with proportional {sup 3}He detectors. The measurement stations have been validated for the reprocessing of Uranium Oxide (UOX) fuels with a burn-up rate up to 60 GWd/t. This paper presents a brief overview of the current status of the nuclear measurement stations. (authors)

  16. Status of the nuclear measurement stations for the process control of spent fuel reprocessing at AREVA NC/La Hague

    International Nuclear Information System (INIS)

    Eleon, Cyrille; Passard, Christian; Hupont, Nicolas; Estre, Nicolas; Battel, Benjamin; Doumerc, Philippe; Dupuy, Thierry; Batifol, Marc; Grassi, Gabriele

    2015-01-01

    Nuclear measurements are used at AREVA NC/La Hague for the monitoring of spent fuel reprocessing. The process control is based on gamma-ray spectroscopy, passive neutron counting and active neutron interrogation, and gamma transmission measurements. The main objectives are criticality and safety, online process monitoring, and the determination of the residual fissile mass and activities in the metallic waste remained after fuel shearing and dissolution (empty hulls, grids, end pieces), which are put in radioactive waste drums before compaction. The whole monitoring system is composed of eight measurement stations which will be described in this paper. The main measurement stations no. 1, 3 and 7 are needed for criticality control. Before fuel element shearing for dissolution, station no. 1 allows determining the burn-up of the irradiated fuel by gamma-ray spectroscopy with HP Ge (high purity germanium) detectors. The burn-up is correlated to the 137 Cs and 134 Cs gamma emission rates. The fuel maximal mass which can be loaded in one bucket of the dissolver is estimated from the lowest burn-up fraction of the fuel element. Station no. 3 is dedicated to the control of the correct fuel dissolution, which is performed with a 137 Cs gamma ray measurement with a HP Ge detector. Station no. 7 allows estimating the residual fissile mass in the drums filled with the metallic residues, especially in the hulls, from passive neutron counting (spontaneous fission and alpha-n reactions) and active interrogation (fission prompt neutrons induced by a pulsed neutron generator) with proportional 3 He detectors. The measurement stations have been validated for the reprocessing of Uranium Oxide (UOX) fuels with a burn-up rate up to 60 GWd/t. This paper presents a brief overview of the current status of the nuclear measurement stations. (authors)

  17. Analytical chemistry challenges at the back end of fuel cycle

    International Nuclear Information System (INIS)

    Panja, S.; Dhami, P.S.; Gandhi, P.M.

    2015-01-01

    Among the various nuclear fuel cycle activities, spent fuel reprocessing and nuclear waste management play key role for adaptation of closed fuel cycle option and success of three stage Indian nuclear power programme. Reprocessing mainly aims to recover fissile and fertile component from spent fuel using well known PUREX/THOREX processes. Waste management deals with all the activities which are essential for safe management of radioactive wastes that get generated during entire nuclear fuel cycle operation

  18. Stabilization of high-level waste from a chloride volatility nuclear fuel reprocessing system

    International Nuclear Information System (INIS)

    Smith, L.A.; Thornton, T.A.

    1979-01-01

    Methods for stabilizing high-level waste from a chloride volatility thorium-based fuel coprocessing system have been studied. The waste, which is present as chloride salts, is combined with SiO 2 or Al 2 O 3 and pyrohydrolyzed to remove the chloride ions. The resulting solid is then combined with a flux and glassified. 3 figures, 4 tables

  19. Aqueous reprocessing - some dreams!

    International Nuclear Information System (INIS)

    Srinivasan, T.G.

    2015-01-01

    India has been pursuing a aqueous reprocessing based closed fuel cycle for both thermal and fast reactor fuels employing the PUREX process. Though the country has more than six decades of experience, the dreams or wish lists such as, a highly efficient process with textbook specifications of 99.9% recovery of U and Pu, a DF of more than 10 7 for both U and Pu from the fission products, operating with name plate capacity with high safety, low waste generation, recovery of useful fission products and minor actinides from high level waste are never ceasing and ever growing. The talk will cover safety precautions and actions to be taken in the steps listed below, to ensure a safe and successful process

  20. Role of the consolidated fuel reprocessing program in the United States Breeder Reactor Program

    International Nuclear Information System (INIS)

    Ballard, W.W.; Burch, W.D.

    1980-01-01

    While present US policy precludes the commercial reprocessing of LWR fuels and the recycle of plutonium, the policy does encompass the need to continue a program to develop the technology for reprocessing breeder fuels. Some questions have again risen this year as to the pace of the entire breeder program, including recycle, and the answers are evolving. This paper and the other companion papers which describe several aspects of the Consolidated Fuel Reprocessing Program take a longer-range perspective on the total program. Whether the program is implemented in the general time frame described is dependent on future government actions dedicated to carrying out a systematic program that would permit breeders to be commercialized early in the next century

  1. Ministerial ordinance on the establishment of a reserve fund for spent nuclear fuel reprocessing

    International Nuclear Information System (INIS)

    1984-01-01

    The ministerial ordinance provides for a reserve fund for spent nuclear fuel reprocessing, according to the Electricity Enterprises Act. The Government designates an electricity enterprise that must deposit a reserve fund for spent nuclear fuel reprocessing. The electricity enterprise concerned must deposit a certain sum of money as a reserve fund which is the payment left over from spent fuel reprocessing at the end of a fiscal year minus the same at the end of the preceding year less a certain sum, when the former exceeds the latter. Then, concerning the remainder of the reserve fund in the preceding year, a certain sum must be subtracted from this reserve fund. (Mori, K.)

  2. Design aspects of water usage in the Windscale nuclear fuel reprocessing plants

    International Nuclear Information System (INIS)

    Wharton, J.; Bullock, M.J.

    1982-01-01

    The safeguard requirements of a nuclear fuel reprocessing plant place unique constraints on a designer which, in turn, affect the scope for the exercise of water economy. These constraints are examined within the context of the British Nuclear Fuels Limited reprocessing plants at Windscale and indicate the scope for water conservation. The plants and their design principles are described with particular reference to water services and usage. Progressive design development is discussed to illustrate the increasing importance of water economy. (author)

  3. Biodegradation of radioactive organic liquid waste from spent fuel reprocessing; Biodegradacao de rejeitos radioativos liquidos organicos provenientes do reprocessamento do combustivel nuclear

    Energy Technology Data Exchange (ETDEWEB)

    Ferreira, Rafael Vicente de Padua

    2008-07-01

    The research and development program in reprocessing of low burn-up spent fuel elements began in Brazil in 70's, originating the lab-scale hot cell, known as Celeste located at Nuclear and Energy Research Institute, IPEN - CNEN/SP. The program was ended at the beginning of 90's, and the laboratory was closed down. Part of the radioactive waste generated mainly from the analytical laboratories is stored waiting for treatment at the Waste Management Laboratory, and it is constituted by mixture of aqueous and organic phases. The most widely used technique for the treatment of radioactive liquid wastes is the solidification in cement matrix, due to the low processing costs and compatibility with a wide variety of wastes. However, organics are generally incompatible with cement, interfering with the hydration and setting processes, and requiring pre -treatment with special additives to stabilize or destroy them. The objective of this work can be divided in three parts: organic compounds characterization in the radioactive liquid waste; the occurrence of bacterial consortia from Pocos de Caldas uranium mine soil and Sao Sebastiao estuary sediments that are able to degrade organic compounds; and the development of a methodology to biodegrade organic compounds from the radioactive liquid waste aiming the cementation. From the characterization analysis, TBP and ethyl acetate were chosen to be degraded. The results showed that selected bacterial consortia were efficient for the organic liquid wastes degradation. At the end of the experiments the biodegradation level were 66% for ethyl acetate and 70% for the TBP. (author)

  4. German Spent Nuclear Fuel Legacy: Characteristics and High-Level Waste Management Issues

    Directory of Open Access Journals (Sweden)

    A. Schwenk-Ferrero

    2013-01-01

    Full Text Available Germany is phasing-out the utilization of nuclear energy until 2022. Currently, nine light water reactors of originally nineteen are still connected to the grid. All power plants generate high-level nuclear waste like spent uranium or mixed uranium-plutonium dioxide fuel which has to be properly managed. Moreover, vitrified high-level waste containing minor actinides, fission products, and traces of plutonium reprocessing loses produced by reprocessing facilities has to be disposed of. In the paper, the assessments of German spent fuel legacy (heavy metal content and the nuclide composition of this inventory have been done. The methodology used applies advanced nuclear fuel cycle simulation techniques in order to reproduce the operation of the German nuclear power plants from 1969 till 2022. NFCSim code developed by LANL was adopted for this purpose. It was estimated that ~10,300 tonnes of unreprocessed nuclear spent fuel will be generated until the shut-down of the ultimate German reactor. This inventory will contain ~131 tonnes of plutonium, ~21 tonnes of minor actinides, and 440 tonnes of fission products. Apart from this, ca.215 tonnes of vitrified HLW will be present. As fission products and transuranium elements remain radioactive from 104 to 106 years, the characteristics of spent fuel legacy over this period are estimated, and their impacts on decay storage and final repository are discussed.

  5. The future implications of some long-lived fission product nuclides discharged to the environment in fuel reprocessing wastes

    International Nuclear Information System (INIS)

    Bryant, P.M.; Jones, J.A.

    1972-12-01

    Current reprocessing practice leads to the discharge to the environment of virtually all the krypton-85 and tritium, and a large fraction of the iodine-129, formed as fission products in reactor fuel. As nuclear power programmes expand the global inventory of these long-lived nuclides is increasing. The radiological significance of these discharges is assessed in terms of radiation exposure of various population groups during the next few decades. The results of this assessment show that krypton-85 will give higher dose rates than tritium or iodine-129, but that on conventional radiological protection criteria these do not justify taking action to remove krypton-85 from reprocessing plant effluents before the 21st century. (author)

  6. Strategic environmental assessment of the national programme for the safe management of spent fuel and radioactive waste

    Energy Technology Data Exchange (ETDEWEB)

    Steinhoff, Mathias; Kallenbach-Herbert, Beate; Claus, Manuel [Oeko-Institut e.V. Darmstadt (Germany); and others

    2015-03-27

    The report on the strategic environmental audit for the national waste disposal program covers the following issues: aim of the study, active factors, environmental objectives; description and evaluation of environmental impact including site selection criteria for final repositories of heat generating radioactive waste, intermediate storage of spent fuel elements and waste from reprocessing plants, disposal of wastes retrieved from Asse II; hypothetical zero variants.

  7. Strategic environmental assessment of the national programme for the safe management of spent fuel and radioactive waste

    International Nuclear Information System (INIS)

    Steinhoff, Mathias; Kallenbach-Herbert, Beate; Claus, Manuel

    2015-01-01

    The report on the strategic environmental audit for the national waste disposal program covers the following issues: aim of the study, active factors, environmental objectives; description and evaluation of environmental impact including site selection criteria for final repositories of heat generating radioactive waste, intermediate storage of spent fuel elements and waste from reprocessing plants, disposal of wastes retrieved from Asse II; hypothetical zero variants.

  8. Reprocessing of spent nuclear fuels. Status and trends

    International Nuclear Information System (INIS)

    Hultgren, Aa.

    1993-01-01

    The report gives a short review of the status for industrial reprocessing and recycling of Uranium/Plutonium. The following countries are covered: Belgium, France, Germany, Great Britain, India, Japan, Russia, USA. Different fuel cycle strategies are accounted for, and new developments outlined. 116 refs, 27 figs, 12 tabs

  9. Possibilities of tritium removal from waste waters of pressurized water reactors and fuel reprocessing plants

    International Nuclear Information System (INIS)

    Ribnikar, S.V.; Pupezin, J.D.

    1975-01-01

    Starting from parameters known for heavy water production processes, a parallel was made with separation of tritium from water. The quantity in common is the total cascade flow. The most efficient processes appear to be hydrogen sulfide, water exchange, hydrogen- and water distillation. Prospects of application of new processes are discussed briefly. Problems concerning detritiation of pressurized water reactors and large fuel reprocessing plants are analyzed. Detritiation of the former should not present problems. With the latter, economical detritiation can be achieved only after some plant flow patterns are changed. (U.S.)

  10. Management of radioactive solid waste arisings from PFR reprocessing

    International Nuclear Information System (INIS)

    Allardice, R.H.; Hackney, S.; Bailey, G.; Bremner, W.; Lillyman, E.; Pugh, O.; Reekie, J.

    1982-01-01

    A description is given of the solid radioactive waste management facilities for dealing with the arisings from PFR reprocessing at the Dounreay Nuclear Power Development Establishment. Four major categories of solid waste are identified. The 'La Calhene' posting system for the transfer of active wastes which has been installed is discussed. The three new retrievable stores for high α#betta##betta#, high α low #betta##betta# and low α high #betta##betta# are described. The methods of waste categorisation by non-destructive assay techniques are outlined. Finally a review of operating experience with the facilities is presented. (U.K.)

  11. Reprocessing in Sweden: History and perspective

    International Nuclear Information System (INIS)

    Hultgren, Aa.; Oesterlund, C.G.

    1990-10-01

    Against the background of nuclear power development and installation in Sweden an overview is presented of the parallel domestic development of the reprocessing of spent nuclear fuel. The original selection of the natural uranium - heavy water reactor in the 1950s included spent fuel reprocessing and recycle, and process and plant studies were performed to that end. The switch to light water reactors in the 1960s did not change the planning to recycle; however, the participation in the Eurochemic undertaking, and the delay in the nuclear programme stopped further domestic development work. A number of governmental committee investigations in the 1970s on the radioactive waste issue and, above all, the decision to phase out nuclear power by 2010, after a referendum following the TMI-accident, finally resulted in a decision to plan only for direct disposal of spent nuclear fuel. This policy still prevails. (42 refs.)

  12. Intermediate storage of radioactive waste and spent nuclear fuel at the Kola Peninsula

    International Nuclear Information System (INIS)

    Bohmer, N.

    1999-01-01

    The problem of nuclear waste and disused nuclear submarines are a product of the arms race and the Cold War. Russia still continues to build new nuclear submarines, but there are very few provisions being made to properly store old nuclear submarines, and develop sufficient storage facilities for spent nuclear fuel and other radioactive waste. A solution to this problem is proposed: to construct a new regional interim storage facilities at Kola for the spent nuclear fuel instead of transporting it to Mayak, the existing reprocessing plant. This storage should have the capacity to handle the fuel in the existing storage and the fuel still on board of retired nuclear submarines. Its lifetime should be 50 years. later it would be possible to make a decision on the future of this fuel

  13. Solid waste generation in reprocessing nuclear fuel

    International Nuclear Information System (INIS)

    North, E.D.

    1975-01-01

    Estimates are made of the solid wastes generated annually from a 750-ton/year plant (such as the NFS West Valley plant): high-level waste, hulls, intermediate level waste, failed equipment, HEPA filters, spent solvent, alpha contaminated combustible waste, and low specific activity waste. The annual volume of each category is plotted versus the activity level

  14. Future trends in reprocessing

    International Nuclear Information System (INIS)

    Rouyer, H.

    1994-01-01

    This paper about future trends in reprocessing essentially reflects French experience and points of view as an example of countries which, like England and Japan, consider that reprocessing is the best solution for the back end of the fuel cycle. In order to know what the future will be, it is necessary to look back at the past and try to find what have been the main reasons for evolution in that period. For reprocessing, it appears that these motivations have been 'safety and economics'. They will remain the motivations for the future. In addition, new motivations for development are starting to appear which are still imprecise but can be expressed as follows: 'which guarantees will public opinion require in order to be convinced that solutions for waste management, proposed by specialists shall ensure that a healthy environment is preserved for the use of future generations'. Consequently the paper examines successively the evolution of reprocessing in the recent past, what the immediate future could be and finally what should be necessary in the long term. (Author)

  15. Radioactive waste management

    International Nuclear Information System (INIS)

    Blomek, D.

    1980-01-01

    The prospects of nuclear power development in the USA up to 2000 and the problems of the fuel cycle high-level radioactive waste processing and storage are considered. The problems of liquid and solidified radioactive waste transportation and their disposal in salt deposits and other geologic formations are discussed. It is pointed out that the main part of the high-level radioactive wastes are produced at spent fuel reprocessing plants in the form of complex aqueous mixtures. These mixtures contain the decay products of about 35 isotopes which are the nuclear fuel fission products, about 18 actinides and their daughter products as well as corrosion products of fuel cans and structural materials and chemical reagents added in the process of fuel reprocessing. The high-level radioactive waste management includes the liquid waste cooling which is necessary for the short and middle living isotope decay, separation of some most dangerous components from the waste mixture, waste solidification, their storage and disposal. The conclusion is drawn that the seccessful solution of the high-level radioactive waste management problem will permit to solve the problem of the fuel cycle radioactive waste management as a whole. The salt deposits, shales and clays are the most suitable for radioactive waste disposal [ru

  16. Vitrification of HLW produced by uranium/molybdenum fuel reprocessing in cogema's cold crucible melter

    International Nuclear Information System (INIS)

    Quang, R. Do; Petitjean, V.; Hollebeque, F.; Pinet, O.; Flament, T.; Prodhomme, A.; Dalcorso, J. P.

    2003-01-01

    The performance of the vitrification process currently used in the La Hague commercial reprocessing plants has been continuously improved during more than ten years of operation. In parallel COGEMA (industrial Operator), the French Atomic Energy Commission (CEA) and SGN (respectively COGEMA's R and D provider and Engineering) have developed the cold crucible melter vitrification technology to obtain greater operating flexibility, increased plant availability and further reduction of secondary waste generated during operations. The cold crucible is a compact water-cooled melter in which the radioactive waste and the glass additives are melted by direct high frequency induction. The cooling of the melter produces a solidified glass layer that protects the melter's inner wall from corrosion. Because the heat is transferred directly to the melt, high operating temperatures can be achieved with no impact on the melter itself. COGEMA plans to implement the cold crucible technology to vitrify high level liquid waste from reprocessed spent U-Mo-Sn-Al fuel (used in gas cooled reactor). The cold crucible was selected for the vitrification of this particularly hard-to-process waste stream because it could not be reasonably processed in the standard hot induction melters currently used at the La Hague vitrification facilities : the waste has a high molybdenum content which makes it very corrosive and also requires a special high temperature glass formulation to obtain sufficiently high waste loading factors (12% in molybdenum). A special glass formulation has been developed by the CEA and has been qualified through lab and pilot testing to meet standard waste acceptance criteria for final disposal of the U-Mo waste. The process and the associated technologies have been also being qualified on a full-scale prototype at the CEA pilot facility in Marcoule. Engineering study has been integrated in parallel in order to take into account that the Cold Crucible should be installed

  17. Vitrification of HLW Produced by Uranium/Molybdenum Fuel Reprocessing in COGEMA's Cold Crucible Melter

    International Nuclear Information System (INIS)

    Do Quang, R.; Petitjean, V.; Hollebecque, F.; Pinet, O.; Flament, T.; Prod'homme, A.

    2003-01-01

    The performance of the vitrification process currently used in the La Hague commercial reprocessing plants has been continuously improved during more than ten years of operation. In parallel COGEMA (industrial Operator), the French Atomic Energy Commission (CEA) and SGN (respectively COGEMA's R and D provider and Engineering) have developed the cold crucible melter vitrification technology to obtain greater operating flexibility, increased plant availability and further reduction of secondary waste generated during operations. The cold crucible is a compact water-cooled melter in which the radioactive waste and the glass additives are melted by direct high frequency induction. The cooling of the melter produces a solidified glass layer that protects the melter's inner wall from corrosion. Because the heat is transferred directly to the melt, high operating temperatures can be achieved with no impact on the melter itself. COGEMA plans to implement the cold crucible technology to vitrify high level liquid waste from reprocessed spent U-Mo-Sn-Al fuel (used in gas cooled reactor). The cold crucible was selected for the vitrification of this particularly hard-to-process waste stream because it could not be reasonably processed in the standard hot induction melters currently used at the La Hague vitrification facilities : the waste has a high molybdenum content which makes it very corrosive and also requires a special high temperature glass formulation to obtain sufficiently high waste loading factors (12 % in molybdenum). A special glass formulation has been developed by the CEA and has been qualified through lab and pilot testing to meet standard waste acceptance criteria for final disposal of the U-Mo waste. The process and the associated technologies have been also being qualified on a full-scale prototype at the CEA pilot facility in Marcoule. Engineering study has been integrated in parallel in order to take into account that the Cold Crucible should be installed

  18. Fuel reprocessing at THORP: profitability and public liabilities

    International Nuclear Information System (INIS)

    Berkhout, F.

    1992-01-01

    Since the economics of British Nuclear Fuels Limited's (BNFL) Thermal Oxide Reprocessing Plant (THORP) were analysed in an earlier report, a number of domestic and international developments have affected the prospects for THORP. The present report outlines these changes, and analyses their implications for the profits and public liabilities associated with the project. Timing is of some significance because once THORP becomes radioactive (planned to occur in March 1993) the bill for decommissioning the plant will rise from a trivial sum to a very large one - Pound 900 million (1992 prices) in BNFL's own estimates. The report begins with a brief outline of reprocessing and the THORP project. It then examines the market prospects for reprocessing beyond THORP's first ten years and revises BNFL's own projections. It then considers the potential profitability of THORP in relation to various possible cost increases and finally outlines the possible implications of different THORP scenarios for the public purse. (author)

  19. Fuel reprocessing plant - no solution for the economy of the region

    International Nuclear Information System (INIS)

    Elvers, G.

    1986-01-01

    Both for the construction and operation stage, the direct and indirect impact of the fuel reprocessing plant on employment on the whole will be negative. It is not altogether certain either that there will be no adverse effects for the areas of tourism. The top organization of German trade unions (DGB) holds that a different structure-political concept from the one represented by the large-scale project of the fuel reprocessing plant would be more appropriate for the region. Employment in the steel and construction industries must be safeguarded by corresponding programmes, and new employment must be created in small- and medium-size companies. (DG) [de

  20. Compaction of irradiated fuel can wastes by high temperature melting in cold crucibles

    International Nuclear Information System (INIS)

    Piccinato, R.; Ruty, J.P.; Caraballo, R.; Jacquet-Francillon, N.

    1993-01-01

    The fusion of hull wastes obtained from the reprocessing of various irradiated fuels is an alternative method to the cementation process used for the conditioning of such wastes. This new process, based on the direct fusion of hulls, has been carried out at CEA Marcoule with an inactive industrial prototype and qualified with an active laboratory prototype. The report shows the results obtained with the lab prototype on stainless steel and zircaloy hulls

  1. Waste management safety

    International Nuclear Information System (INIS)

    Boehm, H.

    1983-01-01

    All studies carried out by competent authors of the safety of a waste management concept on the basis of reprocessing of the spent fuel elements and storage in the deep underground of the radioactive waste show that only a minor technical risk is involved in this step. This also holds true when evaluating the accidents which have occurred in waste management facilities. To explain the risk, first the completely different safety aspects of nuclear power plants, reprocessing plants and repositories are outlined together with the safety related characteristics of these plants. Also this comparison indicates that the risk of waste management facilities is considerably lower than the, already very small, risk of nuclear power plants. For the final storage of waste from reprocessing and for the direct storage of fuel elements, the results of safety analyses show that the radiological exposure following an accident with radioactivity releases, even under conservative assumptions, is considerably below the natural radiation exposure. The very small danger to the environment arising from waste management by reprocessing clearly indicates that aspects of technical safety alone will hardly be a major criterion for the decision in favor of one or the other waste management approach. (orig.) [de

  2. Nondestructive assay measurements applied to reprocessing plants

    International Nuclear Information System (INIS)

    Ruhter, Wayne D.; Lee, R. Stephen; Ottmar, Herbert; Guardini, Sergio

    1999-01-01

    Nondestructive assay for reprocessing plants relies on passive gamma-ray spectrometry for plutonium isotopic and plutonium mass values of medium-to-low-density samples and holdup deposits; on active x-ray fluorescence and densitometry techniques for uranium and plutonium concentrations in solutions; on calorimetry for plutonium mass in product; and passive neutron techniques for plutonium mass in spent fuel, product, and waste. This paper will describe the radiation-based nondestructive assay techniques used to perform materials accounting measurements. The paper will also discuss nondestructive assay measurements used in inspections of reprocessing plants [ru

  3. Will the world SNF be reprocessed in Russia?

    International Nuclear Information System (INIS)

    Gagarinski, A.

    2000-01-01

    accepts the spent fuel assemblies from Bulgarian, Hungarian, Slovak and Ukrainian WWERs, under the agreements signed in the seventies and eighties. It is quite obvious, that this initiative couldn't have been accepted immediately, since today this procedure is blocked by the Law 'On natural environment protection', adopted in the first months of 'Russia's liberation from the Union'. State Duma deputies have submitted to the Parliament the bill 'On industrial reprocessing and storage of spent nuclear fuel', which, for the first time in Russian legislation, removes the label of 'nuclear waste' from SNF. This proposal has already been supported by Russian institutions, responsible for nuclear safety, population health and state of the environment. Certainly, this Minatom's initiative has resulted in a wave of negative emotions in the mass media, which, however, has very soon calmed. Main opponents - former President's Advisor on Ecology, and Chairwoman of the State Duma's Committee on Ecology - have both published sharp articles: 'We don't need somebody's waste, we have enough waste of our own' and 'Minatom's activities ... are a threat for the country's national security'. Nevertheless, 'the caravan moves'. Ten of Russian regional Governors (out of 89) have announced their support of 'SNF import'. The final decision depends on the new Parliament, which will be elected on December 19, 1999, and on the public. The position of Russian nuclear specialists is clear. If our joint goal with ecologists will be to achieve the maximum possible reliability and safety of existing and future nuclear industries - we shall go the same way. If one of the parties has a goal of closing the nuclear power industry, and, to begin to ban nuclear fuel reprocessing, - we shall take another way. We are convinced that without nuclear energy the mankind has no future, and is (and will be) no normal ecology without it. This is still more important for Russia, which has to solve the ecological problems

  4. Materials management in an internationally safeguarded fuels reprocessing plant

    International Nuclear Information System (INIS)

    Hakkila, E.A.; Cobb, D.D.; Dayem, H.A.; Dietz, R.J.; Kern, E.A.; Markin, J.T.; Shipley, J.P.; Barnes, J.W.; Scheinman, L.

    1980-04-01

    The first volume of this report summarizes the results and conclusions for this study of conventional and advanced nuclear materials accounting systems applicable for both large (1500 MTHM/y) and small (210 MTHM/y) spent-fuel reprocessing facilities subject to international verification

  5. Decontamination and decommissioning of the West Valley Reprocessing Plant

    International Nuclear Information System (INIS)

    Daugherty, H.F.; Keel, R.

    1986-11-01

    This report presents the decontamination and decommissioning (D and D) activities at the West Valley Nuclear Fuel Reprocessing Plant through September 1, 1986. The topics addressed are: D and D of areas for reuse by the Liquid Waste Treatment System (LWTS); D and D of areas for reuse as High Level Waste (HLW) canister storage; and technologies developed in D and D work

  6. Shield requirement estimation for pin storage room in fuel fabrication plant

    International Nuclear Information System (INIS)

    Shanthi, M.M.; Keshavamurthy, R.S.; Sivashankaran, G.

    2012-01-01

    Fast Reactor Fuel Cycle Facility (FRFCF) is an upcoming project in Kalpakkam. It has the facility to recycle the fuel from PFBR. It is an integrated facility, consists of fuel reprocessing plant, fuel fabrication plant (FFP), core subassembly plant, Reprocessed Uranium plant (RUP) and waste management plant. The spent fuel from PFBR would be reprocessed in fuel reprocessing plant. The reprocessed fuel material would be sent to fuel fabrication plant. The main activity of fuel fabrication plant is the production of MOX fuel pins. The fuel fabrication plant has a fuel pin storage room. The shield requirement for the pin storage room has been estimated by Monte Carlo method. (author)

  7. Selected studies in HTGR reprocessing development

    International Nuclear Information System (INIS)

    Notz, K.J.

    1976-03-01

    Recent work at ORNL on hot cell studies, off-gas cleanup, and waste handling is reviewed. The work includes small-scale burning tests with irradiated fuels to study fission product release, development of the KALC process for the removal of 85 Kr from a CO 2 stream, preliminary work on a nonfluidized bed burner, solvent extraction studies including computer modeling, characterization of reprocessing wastes, and initiation of a development program for the fixation of 14 C as CaCO 3

  8. Actinide burning and waste disposal

    Energy Technology Data Exchange (ETDEWEB)

    Pigford, T H [University of California, Berkeley, CA (United States)

    1990-07-01

    Here we review technical and economic features of a new proposal for a synergistic waste-management system involving reprocessing the spent fuel otherwise destined for a U.S. high-level waste repository and transmuting the recovered actinides in a fast reactor. The proposal would require a U.S. fuel reprocessing plant, capable of recovering and recycling all actinides, including neptunium americium, and curium, from LWR spent fuel, at recoveries of 99.9% to 99.999%. The recovered transuranics would fuel the annual introduction of 14 GWe of actinide-burning liquid-metal fast reactors (ALMRs), beginning in the period 2005 to 2012. The new ALMRs would be accompanied by pyrochemical reprocessing facilities to recover and recycle all actinides from discharged ALMR fuel. By the year 2045 all of the LWR spent fuel now destined f a geologic repository would be reprocessed. Costs of constructing and operating these new reprocessing and reactor facilities would be borne by U.S. industry, from the sale of electrical energy produced. The ALMR program expects that ALMRs that burn actinides from LWR spent fuel will be more economical power producers than LWRs as early as 2005 to 2012, so that they can be prudently selected by electric utility companies for new construction of nuclear power plants in that era. Some leaders of DOE and its contractors argue that recovering actinides from spent fuel waste and burning them in fast reactors would reduce the life of the remaining waste to about 200-300 years, instead of 00,000 years. The waste could then be stored above ground until it dies out. Some argue that no geologic repositories would be needed. The current view expressed within the ALMR program is that actinide recycle technology would not replace the need for a geologic repository, but that removing actinides from the waste for even the first repository would simplify design and licensing of that repository. A second geologic repository would not be needed. Waste now planned

  9. Actinide burning and waste disposal

    International Nuclear Information System (INIS)

    Pigford, T.H.

    1990-01-01

    Here we review technical and economic features of a new proposal for a synergistic waste-management system involving reprocessing the spent fuel otherwise destined for a U.S. high-level waste repository and transmuting the recovered actinides in a fast reactor. The proposal would require a U.S. fuel reprocessing plant, capable of recovering and recycling all actinides, including neptunium americium, and curium, from LWR spent fuel, at recoveries of 99.9% to 99.999%. The recovered transuranics would fuel the annual introduction of 14 GWe of actinide-burning liquid-metal fast reactors (ALMRs), beginning in the period 2005 to 2012. The new ALMRs would be accompanied by pyrochemical reprocessing facilities to recover and recycle all actinides from discharged ALMR fuel. By the year 2045 all of the LWR spent fuel now destined f a geologic repository would be reprocessed. Costs of constructing and operating these new reprocessing and reactor facilities would be borne by U.S. industry, from the sale of electrical energy produced. The ALMR program expects that ALMRs that burn actinides from LWR spent fuel will be more economical power producers than LWRs as early as 2005 to 2012, so that they can be prudently selected by electric utility companies for new construction of nuclear power plants in that era. Some leaders of DOE and its contractors argue that recovering actinides from spent fuel waste and burning them in fast reactors would reduce the life of the remaining waste to about 200-300 years, instead of 00,000 years. The waste could then be stored above ground until it dies out. Some argue that no geologic repositories would be needed. The current view expressed within the ALMR program is that actinide recycle technology would not replace the need for a geologic repository, but that removing actinides from the waste for even the first repository would simplify design and licensing of that repository. A second geologic repository would not be needed. Waste now planned

  10. Laser induced photochemical and photophysical processes in fuel reprocessing: present scenario and future prospects

    International Nuclear Information System (INIS)

    Bhowmick, G.K.; Sarkar, S.K.; Ramanujam, A.

    2001-01-01

    State-of-art lasers can meet the very stringent requirements of nuclear technology and hence find application in varied areas of nuclear fuel cycle. Here, we discuss two specific applications in nuclear fuel reprocessing namely (a) add-on photochemical modifications of PUREX process where photochemical reactors replace the chemical reactors, and (b) fast, matrix independent sensitive laser analytical techniques. The photochemical modifications based on laser induced valency adjustment offers efficient separation, easy maintenance and over all reduction in the volume of radioactive waste. The analytical technique of time resolved laser induced fluorescence (TRLIF) has several attractive features like excellent sensitivity, element selective, and capability of on line remote process monitoring. For optically opaque solutions, optical excitation is detected by its conversion into thermal energy by non-radiative relaxation processes using the photo-thermal spectroscopic techniques. (author)

  11. Reprocessed and combined thorium fuel cycles in a PER system with a micro heterogeneous approaches

    International Nuclear Information System (INIS)

    Monteiro, Fabiana B.A.; Castro, Victor F.; Faria, Rochkhudson B. de; Pereira, Claubia; Fortini, Angela

    2015-01-01

    A micro heterogeneous approaches were used to study the behavior of reprocessed fuel spiked with thorium in a PWR fuel element considering (TRU-Th) cycle. The goal is to achieve a higher burnup using three different configurations to model the fuel element using SCALE 6.0. The reprocessed fuels were obtained using the ORIGEN 2.1 code from a spent PWR standard fuel (33,000 MWd/tHM burned), with 3.1% of initial enrichment. The spent fuel remained in the cooling pool for five years and then reprocessed using the UREX+ technique. Three configurations of micro heterogeneous approaches were analyzed, and the k inf and plutonium evolution during the burnup were evaluated. The preliminary results show that the behavior of advanced fuel based on transuranic elements spiked with thorium, and micro heterogeneous approach are satisfactory in PWRs, and the configuration that use a combination of Th and TRU (configuration 1) seems to be the most promising once has higher values for k inf during the burnup, compared with other configurations. (author)

  12. Safety of direct disposal of spent fuel and of disposal of reprocessing waste

    Energy Technology Data Exchange (ETDEWEB)

    Besnus, F. [Institut de Radioprotection et de Surete Nucleaire (IRSN), 92 - Fontenay-aux-Roses (France)

    2006-07-01

    In 2005, the French Agency for Radioactive waste management (ANDRA) established a report on the feasibility of the geological disposal of high level and intermediate level long lived radioactive waste, in a clay formation. The hypothesis of spent fuel direct disposal was also considered. By the end of 2005, IRSN performed a complete technical review of ANDRA's report, aiming at highlighting the salient safety issues that were to be addressed within a process that may possibly lead to the creation of a disposal facility for these wastes. The following publication presents the main conclusions of this technical review. (author)

  13. Safety of direct disposal of spent fuel and of disposal of reprocessing waste

    International Nuclear Information System (INIS)

    Besnus, F.

    2006-01-01

    In 2005, the French Agency for Radioactive waste management (ANDRA) established a report on the feasibility of the geological disposal of high level and intermediate level long lived radioactive waste, in a clay formation. The hypothesis of spent fuel direct disposal was also considered. By the end of 2005, IRSN performed a complete technical review of ANDRA's report, aiming at highlighting the salient safety issues that were to be addressed within a process that may possibly lead to the creation of a disposal facility for these wastes. The following publication presents the main conclusions of this technical review. (author)

  14. Method and device for the dry preparation of ceramic uranium dioxide nuclear fuel wastes

    International Nuclear Information System (INIS)

    Pirk, H.; Roepenack, H.; Goeldner, U.

    1977-01-01

    Reprocessing of waste, resulting from the production of ceramic sintered bodies from uranium dioxide for use as nuclear fuel, in a dry process into very finely dispersed pure U 3 O 8 powder may be improved by applying vibrating screening during oxidation. An appropriate device is described. (UWI) [de

  15. Summary of the seismic analyses of the Nuclear Fuel Services Reprocessing Plant at West Valley, New York

    International Nuclear Information System (INIS)

    Endebrock, E.G.

    1978-03-01

    Results are presented from the seismic investigations of the Nuclear Fuel Services Fuel Reprocessing Plant conducted by the Chemical Plants Division of Dravo Corporation (CPD), the Los Alamos Scientific Laboratory (LASL), and the Lawrence Livermore Laboratory (LLL). Results of the different analytical procedures are summarized. The LASL studies showed that structural distress would initially occur in two places, the building piles and the walls of the Mechanical Crane Room. This structural distress would occur at 0.14 g. The LLL investigation showed that the Liquid Waste Cell and the General Purpose Cell would start to show structural distress at 0.09g, and that lateral pile distress would begin at 0.11g

  16. Ventilating system for reprocessing of nuclear fuel rods

    International Nuclear Information System (INIS)

    Szulinski, M.J.

    1981-01-01

    In a nuclear facility such as a reprocessing plant for nuclear fuel rods, the central air cleaner discharging ventilating gas to the atmosphere must meet preselected standards not only as to the momentary concentration of radioactive components, but also as to total quantity per year. In order to comply more satisfactorily with such standards, reprocessing steps are conducted by remote control in a plurality of separate compartments. The air flow for each compartment is regulated so that the air inventory for each compartment has a slow turnover rate of more than a day but less than a year, which slow rate is conveniently designated as quasihermetic sealing. The air inventory in each such compartment is recirculated through a specialized processing unit adapted to cool and/or filter and/or otherwise process the gas. Stale air is withdrawn from such recirculating inventory and fresh air is injected (eg., By the less than perfect sealing of a compartment) into such recirculating inventory so that the air turnover rate is more than a day but less than a year. The amount of air directed through the manifold and duct system from the reprocessing units to the central air cleaner is less than in reprocessing plants of conventional design

  17. Development of challengeable reprocessing and fuel fabrication technologies for advanced fast reactor fuel cycle

    International Nuclear Information System (INIS)

    Nomura, S.; Aoshima, T.; Myochin, M.

    2001-01-01

    R and D in the next five years in Feasibility Study Phase-2 are focused on selected key technologies for the advanced fuel cycle. These are the reference technology of simplified aqueous extraction and fuel pellet short process based on the oxide fuel and the innovative technology of oxide-electrowinning and metal- electrorefining process and their direct particle/metal fuel fabrication methods in a hot cell. Automatic and remote handling system operation in both reprocessing and fuel manufacturing can handle MA and LLFP concurrently with Pu and U attaining the highest recovery and an accurate accountability of these materials. (author)

  18. Report on financing the disposal of commercial spent nuclear fuel and processed high-level radioactive waste

    International Nuclear Information System (INIS)

    Benny, R.I.; Sprecher, W.M.

    1983-06-01

    Projected revenues generated from the 1.0 mill per kWh fee mandated by the Act are sufficient to cover the full range of reference case program costs, assuming 3% annual inflation and nuclear installed capacity of 165 gigawatts-electric by the year 2000. Total estimated costs of the reference waste disposal program, encompassing either spent nuclear fuel disposal or reprocessing waste disposal, range between $18 to 20 billion in constant 1982 dollars. Sensitivity case analyses established upper and lower program cost bounds of $28 billion and $16 billion, respectively (in 1982 dollars). In terms of discounted levelized unit costs, the disposal of spent fuel equates to $122 to 125 per kilogram (uranium) compared with $115 to 119 per kilogram for the reprocessing waste equivalent. The levelized unit costs for reprocessing exclude the solidification of liquid wastes. Such costs are estimated to be $8 per kilogram. Discounted levelized unit costs corresponding to the upper and lower limits of the sensitivity cases equate to $176 per kilogram and $107 per kilogram. The 1.0 mill per kWh fee will be reviewed annually and adjusted, if necessary, to accommodate changes in program costs due to inflation and program shifts. When adjustments are made for applicable discount rates, inflation, repository design changes, and other factors, levelized unit costs for the reference case presented in this analysis agree closely with the results of two previous Department of Energy studies concerning charges for spent fuel storage and disposal services provided by the Federal government. The cost estimates developed for the program were based on the best available data

  19. Development of analytical model for condensation of vapor mixture of nitric acid and water affected volatilized ruthenium behavior in accident of evaporation to dryness by boiling of reprocessed high level liquid waste at fuel reprocessing facilities

    International Nuclear Information System (INIS)

    Yoshida, Kazuo

    2016-08-01

    An accident of evaporation to dryness by boiling of high level liquid waste is postulated as one of the severe accidents caused by the loss of cooling function at a fuel reprocessing plant. In this case, continuous vaporing of nitric acid and water leads to increase Ru volatilization in liquid waste temperature over 120degC at later boiling and dry out phases. It has been observed at the experiments with actual and synthetic liquid waste that some amount of Ru volatilizes and transfers into condensed nitric acid solution at those phases. The nitric acid and water vapor flowing from waste tank are expected to condense at compartments of actual facilities building. The volatilized Ru could transfer into condensed liquid. It is key issues for quantifying the amount of transferred Ru through the facility building to simulate these thermodynamic and chemical behaviors. An analytical model has been proposed in this report based on the condensation mechanisms of nitric acid and water in vapor-liquid equilibria. It has been also carried out for the proposed model being feasible to formulate the activity coefficients and to review the thermodynamic properties of nitric acid solution. Practicability of the proposed analytical model has been shown successfully through the feasibility study with simulation of an experiment result. (author)

  20. Consolidated fuel reprocessing program. Progress report, January 1-March 31, 1981

    International Nuclear Information System (INIS)

    1981-06-01

    Progress and activities are reported on process development, laboratory R and D, engineering research, engineering systems, Integrated Equipment Test (IET) facility operations, and HTGR fuel reprocessing

  1. Nuclear energy without waste reprocessing in West Germany?

    International Nuclear Information System (INIS)

    Ebert, K.

    1989-01-01

    The decision to discontinue construction of the Wackersdorf waste reprocessing plant has been an item of public interest for only a short period; even supporters of nuclear power seemed to have been just relieved that this controversial project was off the agenda, and done with. So only little was to be heard from experts about the facts, background, and consequences of this decision. The author of the article in hand is head of the Hot Chemistry Institute of the Karlsruhe Nuclear Research Centre and therefore has been a leading scientist in the development of reprocessing technology. He presents from his point of view the facts and reasons leading to the decision, and explains the possible consequences for the F.R.G. (orig./RB) [de

  2. Economics and resources analysis of the potential use of reprocessing options by the current Spanish nuclear reactor park

    Energy Technology Data Exchange (ETDEWEB)

    Alvarez-Velarde, F.; Merino Rodriguez, I.; Gonzalez-Romero, E.

    2014-07-01

    Reprocessing of irradiated nuclear fuel serves multiple purposes, from Pu separation and recovery for MOX fuel fabrication to reduction of high level waste volume, and is nowadays being implemented in several countries like France, Japan, Russia or United Kingdom. This work is aimed at exploring the possibility (in resources and economic terms) of implementing reprocessing for MOX fabrication in Spain. (Author)

  3. Development of process simulation code for reprocessing plant and process analysis for solvent degradation and solvent washing waste

    International Nuclear Information System (INIS)

    Tsukada, Tsuyoshi; Takahashi, Keiki

    1999-01-01

    We developed a process simulation code for an entire nuclear fuel reprocessing plant. The code can be used on a PC. Almost all of the equipment in the reprocessing plant is included in the code and the mass balance model of each item of equipment is based on the distribution factors of flow-out streams. All models are connected between the outlet flow and the inlet flow according to the process flow sheet. We estimated the amount of DBP from TBP degradation in the entire process by using the developed code. Most of the DBP is generated in the Pu refining process by the effect of α radiation from Pu, which is extracted in a solvent. On the other hand, very little of DBP is generated in the U refining process. We therefore propose simplification of the solvent washing process and volume reduction of the alkali washing waste in the U refining process. The first Japanese commercial reprocessing plant is currently under construction at Rokkasho Mura, Recently, for the sake of process simplification, the original process design has been changed. Using our code, we analyzed the original process and the simplified process. According our results, the volume of alkali waste solution in the low-level liquid treatment process will be reduced by half in the simplified process. (author)

  4. Engineering study: Fast Flux Test Facility fuel reprocessing

    International Nuclear Information System (INIS)

    Beary, M.M.; Raab, G.J.; Reynolds, W.R. Jr.; Yoder, R.A.

    1974-01-01

    Several alternatives were studied for reprocessing FFTF fuels at Hanford. Alternative I would be to decontaminate and trim the fuel at T Plant and electrolytically dissolve the fuel at Purex. Alternative II would be to decontaminate and shear leach the fuels in a new facility near Purex. Alternative III would be to decontaminate and store fuel elements indefinitely at T Plant for subsequent offsite shipment. Alternative I, 8 to 10 M$ and 13 quarter-years; for Alternative II, 24 to 28 M$ and 20 quarter-years; for Alternative III, 3 to 4 M$ and 8 quarter-years. Unless there is considerable slippage in the FFTF shipping schedule, it would not be possible to build a new facility as described in Alternative II in time without building temporary storage facilities at T Plant, as described in Alternative III

  5. The development of basic glass formulations for solidifying HLW from nuclear fuel reprocessing plant

    International Nuclear Information System (INIS)

    Jiang Yaozhong; Tang Baolong; Zhang Baoshan; Zhou Hui

    1995-01-01

    Basic glass formulations 90U/19, 90U/20, 90Nd/7 and 90Nd/10 applied in electric melting process are developed by using the mathematical model of the viscosity and electric resistance of waste glass. The yellow phase does not occur for basic glass formulations 90U/19 and 90U/20 solidifying HLW from nuclear fuel reprocessing plant when the waste loading is 20%. Under the waste loading is 16%, the process and product properties of glass 90U/19 and 90U/20 come up to or surpass the properties of the same kind of foreign waste glasses, and other properties are about the same to them of foreign waste glasses. The process and product properties of basic glass formulations 90Nd/7 and 90Nd/10 used for the solidification of 'U replaced by Nd' liquid waste are almost similar to them of 90U/19 and 90U/20. These properties fairly meet the requirements of 'joint test' (performed at KfK-INE, Germany). Among these formulations, 90Nd/7 is applied in cold engineering scale electric melting test performed at KfK-INE in Germany. The main process properties of cold test is similar to laboratory results

  6. Session 1984-85. Radioactive waste. Minutes of evidence, Wednesday 23 October 1985. Department of the Environment

    International Nuclear Information System (INIS)

    1985-01-01

    The Environment Select Committee of the House of Commons received a memorandum from the Department of the Environment on radioactive waste and reprocessing, under the headings: long-term management of spent fuel; comparison of wastes arising from reprocessing and storage/disposal of spent fuel; the spent fuel assemblies; waste arising from spent-fuel management at reactor sites; reprocessing wastes; long-term storage and direct disposal of spent fuel; liquid and gaseous discharges; CEGB note on the drying-off and subsequent long term storage of spent magnox fuel. The Minister of the Environment and representatives of the Department of the Environment were examined on the subject of the memorandum. The problems of finding sites suitable for radioactive waste storage/disposal and acceptable to public opinion were discussed. (U.K.)

  7. The fuel reprocessing plant at Wackersdorf

    International Nuclear Information System (INIS)

    Held, M.

    1986-01-01

    For a more systematic discussion about the fuel reprocessing plant at Wackersdorf, the colloquium tried to cover the most important questions put forward in the controversies: economic efficiency and energy-political needs; safety and ecological repercussions; inner safety and consequences for basic rights and the regional economic structure; majority decisions and participation of the population of the region. Elements of evaluation are the conservation of resources, health, economic efficiency, and citizens' rights of liberty. The related basic ethical questions are considered. The 18 contributions are individually recorded in the data base. (DG) [de

  8. Pyrochemical reprocessing of molten salt fast reactor fuel: focus on the reductive extraction step

    Directory of Open Access Journals (Sweden)

    Rodrigues Davide

    2015-12-01

    Full Text Available The nuclear fuel reprocessing is a prerequisite for nuclear energy to be a clean and sustainable energy. In the case of the molten salt reactor containing a liquid fuel, pyrometallurgical way is an obvious way. The method for treatment of the liquid fuel is divided into two parts. In-situ injection of helium gas into the fuel leads to extract the gaseous fission products and a part of the noble metals. The second part of the reprocessing is performed by ‘batch’. It aims to recover the fissile material and to separate the minor actinides from fission products. The reprocessing involves several chemical steps based on redox and acido-basic properties of the various elements contained in the fuel salt. One challenge is to perform a selective extraction of actinides and lanthanides in spent liquid fuel. Extraction of actinides and lanthanides are successively performed by a reductive extraction in liquid bismuth pool containing metallic lithium as a reductive reagent. The objective of this paper is to give a description of the several steps of the reprocessing retained for the molten salt fast reactor (MSFR concept and to present the initial results obtained for the reductive extraction experiments realized in static conditions by contacting LiF-ThF4-UF4-NdF3 with a lab-made Bi-Li pool and for which extraction efficiencies of 0.7% for neodymium and 14.0% for uranium were measured. It was concluded that in static conditions, the extraction is governed by a kinetic limitation and not by the thermodynamic equilibrium.

  9. Ecological risk of reprocessing of uranium wastes of the Gafurov-city's tailing pit

    International Nuclear Information System (INIS)

    Hakimov; Nazarov, H.M.; Mirsaidov, U.M.

    2005-01-01

    The authors set as their purpose the investigation of ecological risk of reprocessing of uranium wastes of the Gafurov-city's tailing pit. Having carried out their investigations, the authors came to the conclusion that the effect of radon gas during reprocessing to workers and specialists is minimal if they follow all the required safety rules

  10. The actual state of nuclear fuel cycle

    International Nuclear Information System (INIS)

    Sawai, Masako

    2014-01-01

    The describing author's claims are as follows: a new mythology, semi made-in Japan energy, which 'the energy fundamental plan' creates; what is a nuclear fuel cycle?; operation processes in a reprocessing plant; the existing state against a recycle in dream; does a recycle reduce waste masses?; discharged liquid and gaseous radioactive wastes; an evaluation of exposure 'the value 22 μSv is irresponsible'; the putting off of waste problem in reprocessing; a guide in reprocessing; should a reprocessing be a duty of electric power companies? (M.H.)

  11. Development of new decladding system in the reprocessing process for FBR fuel

    International Nuclear Information System (INIS)

    Yamada, Seiya; Washiya, Tadahiro; Takeuchi, Masayuki; Koizumi, Tsutomu; Aose, Shinichi

    2005-01-01

    As a part of the feasibility study on commercialized fast reactor cycle systems, Japan Nuclear Cycle Development Institute (JNC) has been developing the fuel decladding technology for the dry reprocessing process (oxide electrowinning process) and aqueous reprocessing process. Particularly, in the oxide electrowinning process, the spent fuel should be reduced to powder for quick dissolution in the molten salt at electrolyzer. Therefore, JNC proposes new decladding system with innovative mechanical decladding devices. The decladding system consists of fuel crushing stage, hull separation stage and hull rinsing stage. In the fuel crushing stage, disassembled spent fuel pins are crushed and powdered by mechanical decladding device, then the following stage, the hull and the fuel powder are separated by magnetic separator. Only the fuel powder is fed to the electrolyzer. On the other side, the separated hull is melted by induction heating method, and the small amount of oxide included in the hull fragments is recovered at the hull rinsing stage. The recovered oxide fuel is fed back to the electrolyzer. In this paper, the basic performance of the element equipment that composes this new decladding system will be described. (author)

  12. Gas chromatographic analysis of extractive solvent in reprocessing plants

    International Nuclear Information System (INIS)

    Marlet, B.

    1984-01-01

    Operation of a reprocessing plant using the Purex process is recalled and analytical controls for optimum performance are specified. The aim of this thesis is the development of analytical methods using gas chromatography required to follow the evolution of the extraction solvent during spent fuel reprocessing. The solvent at different concentrations, is analysed along the reprocessing lines in organic or aqueous phases. Solvent degradation interferes with extraction and decomposition products are analysed. The solvent becomes less and less efficient, also it is distilled and quality is checked. Traces of solvent should also be checked in waste water. Analysis are made as simple as possible to facilitate handling of radioactive samples [fr

  13. Sites and projects for the disposal of radioactive waste and repositories in Russia and other states of the former USSR

    International Nuclear Information System (INIS)

    Schneider, L.; Herzog, C.

    2000-01-01

    The nuclear industry in Russia and other states of the former USSR contents the whole nuclear fuel cycle - Uranium mining, fuel element production, nuclear power and research reactors, nuclear powered ships and reprocessing of nuclear fuel. High amounts of radioactive waste are already disposed at the sites of these industrial centers and further radioactive waste is arising in production, reprocessing and decommissioning processes. Spent fuel elements are reprocessed or stored onsite. Solid and liquid wastes are disposed near surface at the sites of nuclear power plants, radiochemical plants, 'Radon'- and other sites. High volumes of high-, medium- and low-level liquid waste with high radioactivity has been injected into deep geologic formations at the sites of radiochemical plants. In Russia perspective all spent fuel elements shall be reprocessed and dry storage facilities are planned for long term storage until reprocessing. Repositories for solid waste are foreseen in deep geological formations (e.g. salt, granite) at several sites. (author)

  14. The future of reprocessing: a synergy of enhanced processes and new approaches

    International Nuclear Information System (INIS)

    Boullis, B.; Josso, F.; Montmain, J.; Buffereau, M.

    1996-01-01

    The December 30, 1991 french law has led scientists to develop new reprocessing processes in order to implement different strategies for the management of long-lived radioactive wastes from spent fuels. Various existing reprocessing processes and facility operation supervision and control techniques (PUREX, DIAMEX, SESAME, ACTINEX, DIAPASON) are briefly described. Three leading CEA scientists discuss the challenges of the future and according research programs. (C.B.)

  15. Radiation protection aspects in decommissioning of a fuel reprocessing plant

    International Nuclear Information System (INIS)

    Kotrappa, P.; Joshi, P.P.; Theyyunni, T.K.; Sidhwa, B.M.; Nadkarni, M.N.

    1980-01-01

    The decontamination of a fuel reprocessing plant which underwent partial decommissioning is described. The following radiation protection aspects of the work are discussed: dismantling and removal of process vessels, columns and process off-gas filters; decontamination of various process areas; and management of liquid and solid wastes. The work was completed safely by using personnel protective equipment such as plastic suits and respirators (gas, particulate and fresh air). Total dose commitment for this work was around 3000 man-rems, including dose received by staff for certain jobs related to the operation of a section of the plant. The external dose was kept below the annual limit of 5000 mrems for any individual. No internal contamination incident occurred which caused a dose commitment in excess of 10% of the annual limit. The fact that all the work was completed by the staff normally associated with the operation of the plant contributed significantly to the management and control of personnel exposures. (H.K.)

  16. Final disposal of spent fuels and high activity waste: status and trends in the world

    International Nuclear Information System (INIS)

    Herscovich de Pahissa, Marta

    2007-01-01

    Geological disposal of spent nuclear fuel and high level waste from reprocessing, properly conditioned, is described. This issue is a major challenge related to radioactive waste management. Several options are analyzed, such as application of separation and transmutation to high level waste before final disposal; need of multinational repositories; a phased approach to deep geological disposal and long term surface storage. Bearing in mind this information, a future article will report the state of art in the world. (author) [es

  17. Disposal of defense spent fuel and HLW from the Idaho Chemical Processing Plant

    International Nuclear Information System (INIS)

    Ermold, L.F.; Loo, H.H.; Klingler, R.D.; Herzog, J.D.; Knecht, D.A.

    1992-12-01

    Acid high-level radioactive waste (HLW) resulting from fuel reprocessing at the Idaho Chemical Processing Plant (ICPP) for the US Department of Energy (DOE) has been solidified to a calcine since 1963 and stored in stainless steel bins enclosed by concrete vaults. Several different types of unprocessed irradiated DOE-owned fuels are also in storage ate the ICPP. In April, 1992, DOE announced that spent fuel would no longer be reprocessed to recover enriched uranium and called for a shutdown of the reprocessing facilities at the ICPP. A new Spent Fuel and HLW Technology Development program was subsequently initiated to develop technologies for immobilizing ICPP spent fuels and HLW for disposal, in accordance with the Nuclear Waste Policy Act. The Program elements include Systems Analysis, Graphite Fuel Disposal, Other Spent Fuel Disposal, Sodium-Bearing Liquid Waste Processing, Calcine Immobilization, and Metal Recycle/Waste Minimization. This paper presents an overview of the ICPP radioactive wastes and current spent fuels, with an emphasis on the description of HLW and spent fuels requiring repository disposal

  18. Hybrid KED/XRF measurement of minor actinides in reprocessing plants

    International Nuclear Information System (INIS)

    Hsue, S.T.; Collins, M.L.

    1996-01-01

    Minor actinides have received considerable attention recently in the nuclear power industry. Because of their potential value as recycle fuels in thermal and breeder reactors, reprocessing plants may have an economic incentive to extract Np, Am, and Cm from their waste streams. This report discusses the technique of hybrid densitometry and its potential to measure Np and Am in reprocessing plants. Precision estimates are made for the hybrid analysis of Np and Am in two types of dissolver solutions

  19. Technology, safety, and costs of decommissioning a reference nuclear fuel reprocessing plant

    International Nuclear Information System (INIS)

    Schneider, K.J.; Jenkins, C.E.; Rhoads, R.E.

    1977-09-01

    Safety and cost information were developed for the conceptual decommissioning of a fuel reprocessing plant with characteristics similar to the Barnwell Nuclear Fuel Plant. The main process building, spent fuel receiving and storage station, liquid radioactive waste storage tank system, and a conceptual high-level waste-solidification facility were postulated to be decommissioned. The plant was conceptually decommissioned to three decommissioning states or modes; layaway, protective storage, and dismantlement. Assuming favorable work performance, the elapsed time required to perform the decommissioning work in each mode following plant shutdown was estimated to be 2.4 years for layaway, 2.7 years for protective storage, and 5.2 years for dismantlement. In addition to these times, approximately 2 years of planning and preparation are required before plant shutdown. Costs, in constant 1975 dollars, for decommissioning were estimated to be $18 million for layaway, $19 million for protective storage and $58 million for dismantlement. Maintenance and surveillance costs were estimated to be $680,000 per year after layaway and $140,000 per year after protective storage. The combination mode of protective storage followed by dismantlement deferred for 10, 30, and 100 years was estimated to cost $64 million, $67 million and $77 million, respectively, in nondiscounted total 1975 dollars. Present values of these costs give reduced costs as dismantlement is deferred. Safety analyses indicate that radiological and nonradiological safety impacts from decommissioning activities should be small. The 50-year radiation dose commitment to the members of the public from airborne releases from normal decommissioning activities were estimated to be less than 11 man-rem

  20. Technology, safety, and costs of decommissioning a reference nuclear fuel reprocessing plant

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, K.J.; Jenkins, C.E.; Rhoads, R.E.

    1977-09-01

    Safety and cost information were developed for the conceptual decommissioning of a fuel reprocessing plant with characteristics similar to the Barnwell Nuclear Fuel Plant. The main process building, spent fuel receiving and storage station, liquid radioactive waste storage tank system, and a conceptual high-level waste-solidification facility were postulated to be decommissioned. The plant was conceptually decommissioned to three decommissioning states or modes; layaway, protective storage, and dismantlement. Assuming favorable work performance, the elapsed time required to perform the decommissioning work in each mode following plant shutdown was estimated to be 2.4 years for layaway, 2.7 years for protective storage, and 5.2 years for dismantlement. In addition to these times, approximately 2 years of planning and preparation are required before plant shutdown. Costs, in constant 1975 dollars, for decommissioning were estimated to be $18 million for layaway, $19 million for protective storage and $58 million for dismantlement. Maintenance and surveillance costs were estimated to be $680,000 per year after layaway and $140,000 per year after protective storage. The combination mode of protective storage followed by dismantlement deferred for 10, 30, and 100 years was estimated to cost $64 million, $67 million and $77 million, respectively, in nondiscounted total 1975 dollars. Present values of these costs give reduced costs as dismantlement is deferred. Safety analyses indicate that radiological and nonradiological safety impacts from decommissioning activities should be small. The 50-year radiation dose commitment to the members of the public from airborne releases from normal decommissioning activities were estimated to be less than 11 man-rem.

  1. Available reprocessing and recycling services for research reactor spent nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    Tozser, Sandor; Marshall, Frances M.; Adelfang, Pablo; Bradley, Edward [International Atomic Energy Agency, Vienna (Austria); Budu, Madalina Elena [SOSNY Research and Development Company, Moscow (Russian Federation); Chiguer, Mustapha [AREVA, Paris La Defense (France)

    2016-03-15

    International activities in the back end of the research reactor (RR) fuel cycle have so far been dominated by the programmes of acceptance of highly-enriched uranium (HEU) spent nuclear fuel (SNF) by the country where it was originally enriched. In the future inventories of LEU SNF will continue to be created and the back end solution of RR SNF remains a critical issue. The IAEA, based on the experience gained during the decade of international cooperation in supporting the objectives of the HEU take-back programmes, drew up a report presenting available reprocessing and recycling services for RR SNF. This paper gives an overview of the report, which will address all aspects of reprocessing and recycling services for RR SNF.

  2. Reprocessing decision

    International Nuclear Information System (INIS)

    Heising, C.D.

    1978-01-01

    The United States must decide whether to permit, delay, or prohibit the reprocessing and recycling of nuclear spent fuel. To permit reprocessing would allow recycle as early as 1985; to delay the decision for a later administration to deal with means spent fuel would mount up at nuclear reactor sites; to prohibit would eliminate recycling and mandate permanent storage. Bayesian decision analysis was used to examine reprocessing costs associated with risks and economic benefits. Three distinct categories of risk that are important in the nuclear fuel cycle are discussed. These are: health, environment, and safety risks; nuclear theft and sabotage; and nuclear weapons proliferation risks. Results are discussed from comparing nine routes to weapons-usuable mterial available to nonweapons states that desire a nuclear capability. These are: production reactor and military reporcessor; research reacotr and military reprocessor; power plant plus military reprocessor or commercial reprocessor; enrichment (centrifuge, gaseous diffusion, electromagnetic separation, or aerodynamic jet cascade); and accelerator. It was found that the commercial power reactor-commercial reprocessor route is comparatively unattractive to a nonweapons state. In summary, allowing nuclear fuel reprocessing to go forward in the United States can be expected to increase the costs to society by a maximum $360 million a year. This is approximately one-seventh of the expected benefit (reduced electricity bills) to be dderived by society from closing the fuel cycle. It appears that the permitting reprocessing now is logically preferable to delaying or prohibiting the technology, the author concludes

  3. Waste transmutation with minimal fuel cycle long-term risk

    Energy Technology Data Exchange (ETDEWEB)

    Slessarev, I.; Salvatores, M.; Uematsu, M. [Direction des Reacteurs Nucleaires, Cadarache (France)

    1995-10-01

    Hybrid systems (source-driven subcritical reactors), are investigated at CEA, mainly from a conceptual point of view, in order to assess their potential to transmute radioactive wastes (mainly long-lived fission products, LLFP) and their potential to insure a minimal long-term radiological risk related both to the fuel inventory inside the system and to the full fuel cycle (mass flows, reprocessing transport, waste disposal). The physics of these systems has been explored and work is in progress both in the field of basic data and INC code validation, in the frame of international collaborations and in the field of conceptual design studies. The most interesting feature of subcritical source-driven system is related to the possibility to obtain an {open_quotes}excess{close_quotes} of neutrons per fission, which can be used to reduce the long-term radiological risk. A specific example will be discussed here.

  4. Viability of Sharing Facilities for the Disposition of Spent Fuel and Nuclear Waste. An Assessment of Recent Proposals

    International Nuclear Information System (INIS)

    2011-01-01

    For a long time, ideas have been put forward and initiatives launched regarding cooperation in the nuclear fuel cycle, including both regional and multilateral approaches, to dealing with reprocessing, storage of spent fuel or, more recently, disposal of radioactive waste. The rationale behind the multinational disposal concepts ranges from concerns about the capability of some countries to implement safe national nuclear waste management programmes in a timely fashion, to questions about the availability of suitable geological formations; and, of course, the economies of scale in repository implementation are a major driver. In addition to these issues of cost, environmental and safety considerations, other benefits of such approaches for storage and underground disposal are security and non-proliferation advantages, which have become increasingly important after recent terrorist events worldwide. The IAEA has supported, since the 1970s, multilateral initiatives that seek to reduce access to weapons usable nuclear material technologies. Among different cooperation concepts, the sharing of facilities for dealing with radioactive waste management was proposed and developed through conferences and expert group meetings, as well as technical publications. The experience gained in other international frameworks, such as groupings in the European Union, was also reviewed. It was concluded that the scenarios and approaches proposed in earlier IAEA publications require further consideration regarding the conditions for their implementation, their viability, and the benefits and challenges inherent in the alternatives proposed. It is useful to consider the wider issue of spent fuel disposition (reprocessing/encapsulation, storage and disposal) when discussing the option of shared repositories for the disposal of spent fuel and high level waste from reprocessing. This proper account to be taken of new initiatives and technologies in predisposal activities and their impact

  5. Radiological considerations in the design of Reprocessing Uranium Plant (RUP) of Fast Reactor Fuel Cycle Facility (FRFCF), Kalpakkam

    International Nuclear Information System (INIS)

    Chandrasekaran, S.; Rajagopal, V.; Jose, M.T.; Venkatraman, B.

    2012-01-01

    A Fast Reactor Fuel Cycle Facility (FRFCF) being planned at Indira Gandhi Centre for Atomic Research, Kalpakkam is an integrated facility with head end and back end of fuel cycle plants co-located in a single place, to meet the refuelling needs of the prototype fast breeder reactor (PFBR). Reprocessed uranium oxide plant (RUP) is one such plant in FRFCF to built to meet annual requirements of UO 2 for fabrication of fuel sub-assemblies (FSAs) and radial blanket sub-assemblies (RSAs) for PFBR. RUP receives reprocessed uranium oxide powder (U 3 O 8 ) from fast reactor fuel reprocessing plant (FRP) of FRFCF. Unlike natural uranium oxide plant, RUP has to handle reprocessed uranium oxide which is likely to have residual fission products activity in addition to traces of plutonium. As the fuel used for PFBR is recycled within these plants, formation of higher actinides in the case of plutonium and formation of higher levels of 232 U in the uranium product would be a radiological problem to be reckoned with. The paper discussed the impact of handling of multi-recycled reprocessed uranium in RUP and the radiological considerations

  6. Consolidated fuel reprocessing program. Progress report, July 1-September 30, 1981

    International Nuclear Information System (INIS)

    1981-12-01

    Technical progress is reported in overview fashion in the following areas: process development, laboratory R and D, engineering research, engineering systems, integrated equipment test facility (IET) operations, and HTGR fuel reprocessing

  7. Commercialization of nuclear fuel cycle business

    International Nuclear Information System (INIS)

    Yakabe, Hideo

    1998-01-01

    Japan depends on foreign countries almost for establishing nuclear fuel cycle. Accordingly, uranium enrichment, spent fuel reprocessing and the safe treatment and disposal of radioactive waste in Japan is important for securing energy. By these means, the stable supply of enriched uranium, the rise of utilization efficiency of uranium and making nuclear power into home-produced energy can be realized. Also this contributes to the protection of earth resources and the preservation of environment. Japan Nuclear Fuel Co., Ltd. operates four business commercially in Rokkasho, Aomori Prefecture, aiming at the completion of nuclear fuel cycle by the technologies developed by Power Reactor and Nuclear Fuel Development Corporation and the introduction of technologies from foreign countries. The conditions of location of nuclear fuel cycle facilities and the course of the location in Rokkasho are described. In the site of about 740 hectares area, uranium enrichment, burying of low level radioactive waste, fuel reprocessing and high level waste control have been carried out, and three businesses except reprocessing already began the operation. The state of operation of these businesses is reported. Hereafter, efforts will be exerted to the securing of safety through trouble-free operation and cost reduction. (K.I.)

  8. Advanced techniques for analytic liquid wastes management in the Rokkasho reprocessing plant

    International Nuclear Information System (INIS)

    Madic, C.; Moulin, J.P.; Runge, S.; Schott, R.; Kashiwai, T.; Hayashi, M.

    1991-01-01

    The JNFS Rokkasho reprocessing plant is a large scale commercial reprocessing plant. Liquid waste treatment relies on concentration by evaporation. The management of liquid wastes is rather sophisticated and implies, beside the organic wastes, sorting out between process and non-process, acidic and salt-bearing, tritiated and low tritiated streams and also according to their level of activity. A particular attention had to be paid to the analytical wastes, as their particularity is to contain not only a significant amount of radioactivity but also some fissile material and exotic chemicals which are useful for analytical purpose but unwanted in the main process mainly because of their corrosive and chelating properties. The analytical wastes are sorted out according to their activity level and fissile material content. On the one hand, a specific process has been developed to recover the bulk of plutonium from the analytical wastes. On the other hand, the foreseeable amount of unwanted chemicals (such as chloride ions) has been drastically reduced by carefully selecting all the analytical methods either by modification of already known methods or in some cases by working out new methods

  9. Geohydrologic conditions at the Nuclear Fuel Reprocessing Plant and Waste-Management Facilities at the western New York Nuclear Service Center, Cattaraugus County, New York

    International Nuclear Information System (INIS)

    Bergeron, M.P.; Kappel, W.M.; Yager, R.M.

    1987-01-01

    A nuclear-fuel reprocessing plant, a high-level radioactive liquid-waste tank complex, and related waste facilities occupy 100 hectares (ha) within the Western New York Nuclear Service Center near West Valley, NY. The facilities are underlain by glacial and postglacial deposits that fill an ancestral bedrock valley. The main plant facilities are on an elevated plateau referred to as the north plateau. Groundwater on the north plateau moves laterally within a surficial sand and gravel from the main plant building to areas northeast, east, and southeast of the facilities. The sand and gravel ranges from 1 to 10 m thick and has a hydraulic conductivity ranging from 0.1 to 7.9 m/day. Two separate burial grounds, a 4-ha area for low-level radioactive waste disposal and a 2.9-ha area for disposal of higher-level waste are excavated into a clay-rich till that ranges from 22 to 28 m thick. Migration of an organic solvent from the area of higher level waste at shallow depth in the till suggests that a shallow, fractured, oxidized, and weathered till is a significant pathway for lateral movement of groundwater. Below this zone, groundwater moves vertically downward through the till to recharge a lacustrine silt and fine sand. Within the saturated parts of the lacustrine unit, groundwater moves laterally to the northeast toward Buttermilk Creek. Hydraulic conductivity of the till, based on field and laboratory analyses, ranges from 0.000018 to 0.000086 m/day

  10. Reprocessing and Waste Treatment Project. Status report 1975, 17 November 1975

    International Nuclear Information System (INIS)

    Issel, W.

    This paper reviews the development and position of industrial reprocessing of nuclear fuels in the German Federal Republic. The KEWA concept is mentioned in particular. Cost estimation and risk are considered

  11. Wrapping up the nuclear fuel cycle

    International Nuclear Information System (INIS)

    Rueth, N.

    1976-01-01

    Reprocessing basically entails recovering uranium and plutonium from spent fuel for reuse in light water reactors (LWRs). The wastes resulting from this process are transformed to products suitable for disposal. These endeavors extend uranium supplies and also reduce the size and amount of nuclear waste that must be stored. Reprocessing, however, also ''unlocks'' the fuel rods that currently imprison radioactive substances. If great care is not taken, it could rip open a Pandora's box, exposing reprocessing plant workers, the general public, and the environment to deadly radioactive substances. While no commercial reprocessing plants are currently operating in the U.S., a scenario for such efforts has been mapped out. The first step is to chop the fuel elements into small pieces so that the fuel is no longer protected by its corrosion-resistant cladding. The fuel is then dissolved away from the cladding with nitric acid. An organic solvent extracts plutonium and uranium, and additional solvent extraction or ion exchange operations separate the two substances. Plutonium is converted to plutonium oxide; uranium 235 is converted to uranium oxide. They can then be combined to a make mixed oxide fuel, and formed into fuel elements for use in nuclear reactors. Various wastes with varied levels of radioactivity are generated during these operations. All demand attention. Radioactive gaseous waste most often is filtered before release through tall stacks. Metal solid waste--debris, fuel claddings, and hulls--may be compacted or cryogenically crushed and stored at specially designed storage sites. Contaminated combustibles, such as paper and resins, are incinerated and the ash is fixed and packaged for storage. The plans of Allied-General Nuclear Services (AGNS), which claims to have the closest thing in the United States to a ready reprocessor are described

  12. Assessment of the insertion of reprocessed fuel spiked with thorium in a PWR core

    Energy Technology Data Exchange (ETDEWEB)

    Castro, Victor F.; Monteiro, Fabiana B.A.; Pereira, Claubia, E-mail: victorfc@fis.grad.ufmg.br, E-mail: claubia@nuclear.ufmg.br [Universidade Federal de Minas Gerais (UFMG), Belo Horizonte, MG (Brazil). Departamento de Engenharia Nuclear

    2017-07-01

    Reprocessed fuel by UREX+ technique and spiked with thorium was inserted in a PWR core and neutronic parameters have been analyzed. Based on the Final Safety Analysis Report (FSAR) of the Angra-2 reactor, the core was modeled and simulated with SCALE6.0 package. The neutronic data evaluation was carried out by the analysis of the effective and infinite multiplication factors, and the fuel evolution during the burnup. The conversion ratio (CR) was also evaluated. The results show that, when inserting reprocessed fuel spiked with thorium, the insertion of burnable poison rods is not necessary, due to the amount of absorber isotopes present in the fuel. Besides, the conversion ratio obtained was greater than the presented by standard UO{sub 2} fuel, indicating the possibility of extending the burnup. (author)

  13. Waste Minimization Study on Pyrochemical Reprocessing Processes

    International Nuclear Information System (INIS)

    Boussier, H.; Conocar, O.; Lacquement, J.

    2006-01-01

    Ideally a new pyro-process should not generate more waste, and should be at least as safe and cost effective as the hydrometallurgical processes currently implemented at industrial scale. This paper describes the thought process, the methodology and some results obtained by process integration studies to devise potential pyro-processes and to assess their capability of achieving this challenging objective. As example the assessment of a process based on salt/metal reductive extraction, designed for the reprocessing of Generation IV carbide spent fuels, is developed. Salt/metal reductive extraction uses the capability of some metals, aluminum in this case, to selectively reduce actinide fluorides previously dissolved in a fluoride salt bath. The reduced actinides enter the metal phase from which they are subsequently recovered; the fission products remain in the salt phase. In fact, the process is not so simple, as it requires upstream and downstream subsidiary steps. All these process steps generate secondary waste flows representing sources of actinide leakage and/or FP discharge. In aqueous processes the main solvent (nitric acid solution) has a low boiling point and evaporate easily or can be removed by distillation, thereby leaving limited flow containing the dissolved substance behind to be incorporated in a confinement matrix. From the point of view of waste generation, one main handicap of molten salt processes, is that the saline phase (fluoride in our case) used as solvent is of same nature than the solutes (radionuclides fluorides) and has a quite high boiling point. So it is not so easy, than it is with aqueous solutions, to separate solvent and solutes in order to confine only radioactive material and limit the final waste flows. Starting from the initial block diagram devised two years ago, the paper shows how process integration studies were able to propose process fittings which lead to a reduction of the waste variety and flows leading at an 'ideal

  14. About possibility of uranium industry wastes reprocessing in Tajikistan

    International Nuclear Information System (INIS)

    Khakimov, N.; Barotov, B.B.; Mirsaidov, I.U.; Barotov, A.M; Akhmedov, M.Z.

    2012-01-01

    One of the main basic fields of economy in Tajikistan is mining industry. Its development in the past lead to accumulation of huge amount of wastes basically from uranium reprocessing enterprises, containing radionuclides in anthropogenic highly concentrations (basically uranium-thorium chain) and other harmful substances. They are located in zones very close to residential as well as in upper course of water inflow of such main rivers of the region as Amudarya and Syrdarya. Sulphates, heavy metals, cyanides and others (basically with water flow) released to the environment besides uranium reprocessing wastes and other mining enterprises. This makes it necessary to restore in the region the complex coordinated monitoring programs with the purpose of their actual assessment and potential impact on environment as well as priority justification of possible remediation measures. One of the important are balance assessment and trans-boundary radionuclide re-deposition of uranium-thorium chain and other toxic elements in Syrdarya and Amudarya rivers with the purpose of regional formation character revealing of radiation and other ecological risks for saving the normal vital activity in the region.

  15. Radioactive Iodine and Krypton Control for Nuclear Fuel Reprocessing Facilities

    Directory of Open Access Journals (Sweden)

    Nick R. Soelberg

    2013-01-01

    Full Text Available The removal of volatile radionuclides generated during used nuclear fuel reprocessing in the US is almost certain to be necessary for the licensing of a reprocessing facility in the US. Various control technologies have been developed, tested, or used over the past 50 years for control of volatile radionuclide emissions from used fuel reprocessing plants. The US DOE has sponsored, since 2009, an Off-gas Sigma Team to perform research and development focused on the most pressing volatile radionuclide control and immobilization problems. In this paper, we focus on the control requirements and methodologies for 85Kr and 129I. Numerous candidate technologies have been studied and developed at laboratory and pilot-plant scales in an effort to meet the need for high iodine control efficiency and to advance alternatives to cryogenic separations for krypton control. Several of these show promising results. Iodine decontamination factors as high as 105, iodine loading capacities, and other adsorption parameters including adsorption rates have been demonstrated under some conditions for both silver zeolite (AgZ and Ag-functionalized aerogel. Sorbents, including an engineered form of AgZ and selected metal organic framework materials (MOFs, have been successfully demonstrated to capture Kr and Xe without the need for separations at cryogenic temperatures.

  16. Measurement and behaviour of technetium in fast reactor fuel reprocessing

    International Nuclear Information System (INIS)

    Ferguson, C.; Kyffin, T.W.

    1986-02-01

    A method is described for the spectrophotometric measurement of technetium in plant solutions from the reprocessing of fast reactor fuel. The technetium is selectively extracted using tri-iso-octylamine. After back extraction, thiocyanate is added, in the presence of tetrabutyl-ammonium hydroxide, to form the red hexa-thiocyanato anionic complex in a chloroform medium. The concentration of the technetium is then calculated from the spectrophotometric measurement of this complex. This method was applied to bulk samples, collected during a PFR fuel reprocessing campaign, to identify the main routes followed by technetium through the reprocessing plant. In order to understand the probable behaviour of technetium in the process plant streams, an investigation into the influence of plutonium IV nitrate on the extraction of Tc (VII) into 20%v/v tributyl phosphate/odourless kerosene solution from nitric acid solutions, was initiated. The results of this investigation, along with the known distribution coefficient for the extraction of the uranyl/technetium complex U0 2 (N0 3 )(Tc0 4 ).2TBP and the redox chemistry of technetium, are used to predict the probable behaviour of technetium in the process plant streams. This predicted behaviour is compared with the experimental results and reasonable agreement is obtained between experiment and theory, considering the history of the samples analysed. (author)

  17. The management of high-level radioactive wastes

    International Nuclear Information System (INIS)

    Lennemann, Wm.L.

    1979-01-01

    The definition of high-level radioactive wastes is given. The following aspects of high-level radioactive wastes' management are discussed: fuel reprocessing and high-level waste; storage of high-level liquid waste; solidification of high-level waste; interim storage of solidified high-level waste; disposal of high-level waste; disposal of irradiated fuel elements as a waste

  18. Improved measurement of aluminum in irradiated fuel reprocessed at the Savannah River Site

    International Nuclear Information System (INIS)

    Maxwell, S.L. III.

    1991-01-01

    At the Savannah River Site (SRS), irradiated fuel from research reactor operators or their contract fuel service companies is reprocessed in the H-Canyon Separations Facility. Final processing costs are based on analytical measurements of the amount of total metal dissolved. Shipper estimates for uranium and uranium-235 and measured values at SRS have historically agreed very well. There have occasionally been significant differences between shipper estimates for aluminum and the aluminum content determined at SRS. To minimize analytical error that might contribute to poor shipper-receiver agreement for the reprocessing of off-site fuel, a new analytical method to measure aluminum was developed by SRS Analytical Laboratories at the Central Laboratory Facilities. An EDTA (ethylenediaminetetraacetic acid) titration method, subject to dissolver matrix interferences, was previously used at SRS to measure aluminum in H-Canyon dissolver during the reprocessing of offsite fuel. The new method combines rapid ion exchange technology with direct current argon plasma spectrometry to enhance the reliability of aluminum measurements for off-site fuel. The technique rapidly removes spectral interferences such as uranium and significantly lowers gamma levels due to fission products. Aluminium is separated quantitatively by using an anion exchange technique that employs oxalate complexing, small particle size resin and rapid flow rates. The new method, which has eliminated matrix interference problems with these analyses and improved the quality of aluminum measurements, has improved the overall agreement between shipper-receiver values for offsite fuel processed SRS

  19. Present status of fuel reprocessing plant in PNC

    International Nuclear Information System (INIS)

    Koyama, Kenji

    1981-01-01

    In the fuel reprocessing plant of the Power Reactor and Nuclear Fuel Development Corporation, its hot test has now been completed. For starting its full-scale operation duly, the data are being collected on the operation performance and safety. The construction was started in June, 1971, and completed in October, 1974. In July, 1977, spent fuel was accepted in the plant, and the hot test was started. In September, the same year, the first fuel shearing was made. So far, a total of about 31 t U from both BWR and PWR plants has been processed, thus the hot test was entirely completed. The following matters are described: hot test and its results, research on Pu and U mixed extraction, utilization of product plutonium, development of safeguard technology, and repair work on the acid recovery evaporation tank. (J.P.N.)

  20. Experience in the construction of a spent nuclear fuel reprocessing plant

    International Nuclear Information System (INIS)

    Yamashita, Hiroshi

    1976-01-01

    The construction and operation of a reprocessing plant was first published in 1956. The Reprocessing Expert Committee of AEC was established in 1959, and the preliminary design was finished in 1964 by NCP of Britain. The detailed design was completed in 1969 by SGN of France, and the training of operators was carried out in parallel with this in France. The results of the safety investigation was approved in Jan. 1970, and the construction was started in June 1971. The site of the reprocessing plant is the eastern part of the Tokai Establishment of PNC. The process adopted is the wet Purex process having been established in large practical plants. The treating capacity is 0.7 t/day. The main processes are acceptance and storage, mechanical treatment, and chemical treatment. The reprocessing facilities comprise the main shop, the analysis station, the main exhaust stack, the decontamination station, the solid waste store, the sea discharge pipe, and other incidental facilities. The construction works were about 7 months behind the schedule when the water flow test was finished. The chemical test was finished in March, 1975, and the uranium test is in progress since Sept., 1975. The problems for future are the developments of effective waste treatment and storing techniques, and the researches have been carried out by PNC. The construction project of the second plant is urgently required, since it takes 10 years from planning to operation. (Kako, I.)

  1. LWR high burn-up operation and MOX introduction. Fuel cycle performance from the viewpoint of waste management

    International Nuclear Information System (INIS)

    Inagaki, Yaohiro; Iwasaki, Tomohiko; Niibori, Yuichi; Sato, Seichi; Ohe, Toshiaki; Kato, Kazuyuki; Torikai, Seishi; Nagasaki, Shinya; Kitayama, Kazumi

    2009-01-01

    From the viewpoint of waste management, a quantitative evaluation of LWR nuclear fuel cycle system performance was carried out, considering both higher burn-up operation of UO 2 fuel coupled with the introduction of MOX fuel. A major parameter to quantify this performance is the number of high-level waste (HLW) glass units generated per GWd (gigawatt-day based on reactor thermal power generation before electrical conversion). This parameter was evaluated for each system up to a maximum burn-up of 70GWd/THM (gigawatt-day per ton of heavy metal) assuming current conventional reprocessing and vitrification conditions where the waste loading of glass is restricted by the heat generation rate, the MoO 3 content, or the noble metal content. The results showed that higher burn-up operation has no significant influence on the number of glass units generated per GWd for UO 2 fuel, though the number of glass units per THM increases linearly with burn-up and is restricted by the heat generation rate. On the other hand, the introduction of MOX fuel causes the number of glass units per GWd to double owing to the increase in the heat generation rate. An extended cooling period of the spent fuel prior to reprocessing effectively reduces the heat generation rate for UO 2 fuel, while a separation of minor actinides (Np, Am, and Cm) from the high-level waste provides additional reduction for MOX fuel. However, neither of these leads to a substantial reduction in the number of glass units, since the MoO 3 content or the noble metal content restricts the number of glass units rather than the heat generation rate. These results suggest that both the MoO 3 content and the noble metal content provide the key to reducing the amount of waste glass that is generated, leading to an overall improvement in fuel cycle system performance. (author)

  2. Nuclear fuel cycle: reprocessing. A bibliography

    International Nuclear Information System (INIS)

    Smith, L.B.

    1982-12-01

    This bibliography contains information on the reprocessing portion of the nuclear fuel cycle included in the Department of Energy's Energy Data Base from January 1981 through November 1982. The abstracts are grouped by subject category. Entries in the subject index also facilitate access by subject. Within each category the arrangement is by report number for reports, followed by nonreports in reverse chronological order. These citations are to research reports, journal articles, books, patents, theses, and conference papers from worldwide sources. Five indexes, each preceded by a brief description, are provided: Corporate Author, Personal Author, Subject, Contract Number, and Report Number

  3. Spent fuel reprocessing and minor actinide partitioning safety related research at the UK National Nuclear Laboratory

    International Nuclear Information System (INIS)

    Carrott, Michael; Flint, Lauren; Gregson, Colin; Griffiths, Tamara; Hodgson, Zara; Maher, Chris; Mason, Chris; McLachlan, Fiona; Orr, Robin; Reilly, Stacey; Rhodes, Chris; Sarsfield, Mark; Sims, Howard; Shepherd, Daniel; Taylor, Robin; Webb, Kevin; Woodall, Sean; Woodhead, David

    2015-01-01

    The development of advanced separation processes for spent nuclear fuel reprocessing and minor actinide recycling is an essential component of international R and D programmes aimed at closing the nuclear fuel cycle around the middle of this century. While both aqueous and pyrochemical processes are under consideration internationally, neither option will gain broad acceptance without significant advances in process safety, waste minimisation, environmental impact and proliferation resistance; at least when compared to current reprocessing technologies. The UK National Nuclear Laboratory (NNL) is developing flowsheets for innovative aqueous separation processes. These include advanced PUREX options (i.e. processes using tributyl phosphate as the extractant for uranium, plutonium and possibly neptunium recovery) and GANEX (grouped actinide extraction) type processes that use diglycolamide based extractants to co-extract all transuranic actinides. At NNL, development of the flowsheets is closely linked to research on process safety, since this is essential for assessing prospects for future industrialisation and deployment. Within this context, NNL is part of European 7. Framework projects 'ASGARD' and 'SACSESS'. Key topics under investigation include: hydrogen generation from aqueous and solvent phases; decomposition of aqueous phase ligands used in separations prior to product finishing and recycle of nitric acid; dissolution of carbide fuels including management of organics generated. Additionally, there is a strong focus on use of predictive process modelling to assess flowsheet sensitivities as well as engineering design and global hazard assessment of these new processes. (authors)

  4. Processing of spent nuclear fuel from light water reactors

    International Nuclear Information System (INIS)

    Sraier, V.

    1978-11-01

    A comprehensive review is given of the reprocessing of spent nuclear fuel from LWR's (covering references up to No. 18 (1977) of INIS inclusively). Particular attention is devoted to waste processing, safety, and reprocessing plants. In the addendum, the present status is shown on the example of KEWA, the projected large German fuel reprocessing plant. (author)

  5. Reprocessing of spent nuclear fuel; Prerada isluzenog nuklearnog goriva

    Energy Technology Data Exchange (ETDEWEB)

    Gal, I [Institute of Nuclear Sciences Boris Kidric, Laboratorija za hemiju visoke aktivnosti, Vinca, Beograd (Serbia and Montenegro)

    1964-12-15

    This volume contains the following reports: Experimental facility for testing and development of pulsed columns and auxiliary devices; Chemical-technology study of the modified 'Purex' process; Chemical and radiometric control analyses; Chromatographic separation of rare earth elements on paper treated by di-n butylphosphate; Preliminary study of some organic nitrogen extracts significant in fuel reprocessing.

  6. Safety highlights of UP2 reprocessing in La Hague

    International Nuclear Information System (INIS)

    Marc, A.; Dubois, G.

    1998-01-01

    The UP2-800 reprocessing plant basically implements the same proven process (PUREX) as UP3 plant. However, some evolutions and additions have been realised: - to reprocess high burn up and MOX fuel assemblies; - to dissolve scraps from reprocessing facilities or from the fabrication of MOX fuels such as UO 2 - PuO 2 powders; - to recover plutonium from ash resulting from alpha waste incineration prior to ash conditioning; - to reduce solid waste alpha activity below the regulatory limits for shallow land disposal. Safety considerations relating to these functions have been taken into account in each step of process design. Safety design rules have been implemented for the UP2-800 plant with the same goals as for the UP3 plant: - keeping the discharge of radioactive liquids and gas within the annual limits authorized under normal operating conditions; - reducing the personnel exposure to a minimum so that 'the number of operators whose integrated dose over a year exceeds 5 mSv be nil or practically nil under normal operating conditions'; - preventing the accidental situations and having at one's disposal the dysfunction monitoring and detection systems and the means to limit their consequences. Particular risks prevention related to the UP2-800 specific functions are described in this paper. (author)

  7. Risk analysis methodology for unreprocessed spent fuel disposal in bedded salt

    International Nuclear Information System (INIS)

    Pepping, R.E.; Chu, M.S.Y.; Cranwell, R.M.

    1982-01-01

    In accordance with the decision to defer the reprocessing of commercially generated spent fuel, we are investigating the implications on risk of direct disposal of spent fuel assemblies. To the extent possible, we are using the methodology developed at Sandia for the NRC to evaluate risks from the disposal of wastes from reprocessing of spent fuel. This allows direct comparison of the risks calculated for the two waste forms. A number of differences between the two waste forms with implications on risk have been identified and investigation of their effects has begun. Among these are the presence of gases and additional plutonium and uranium isotopes, the potential for differing leach behavior, and the difference in the decay heat source which determines the overall thermomechanical response of the host media. We have analyzed a number of scenarios for a hypothetical geologic repository that have been identified as important contributors to risk from the disposal of both reprocessed and unreprocessed spent fuel. For each scenario, we employ the Groundwater Transport, Pathways to Man, and Dosimetry and Health Effects models of the High Level Waste Methodology. Risks are compared for the reprocessed and unreprocessed spent fuel wastes and the effects of uncertainty in the parameters of the various models are compared

  8. The uranium-plutonium breeder reactor fuel cycle

    International Nuclear Information System (INIS)

    Salmon, A.; Allardice, R.H.

    1979-01-01

    All power-producing systems have an associated fuel cycle covering the history of the fuel from its source to its eventual sink. Most, if not all, of the processes of extraction, preparation, generation, reprocessing, waste treatment and transportation are involved. With thermal nuclear reactors more than one fuel cycle is possible, however it is probable that the uranium-plutonium fuel cycle will become predominant; in this cycle the fuel is mined, usually enriched, fabricated, used and then reprocessed. The useful components of the fuel, the uranium and the plutonium, are then available for further use, the waste products are treated and disposed of safely. This particular thermal reactor fuel cycle is essential if the fast breeder reactor (FBR) using plutonium as its major fuel is to be used in a power-producing system, because it provides the necessary initial plutonium to get the system started. In this paper the authors only consider the FBR using plutonium as its major fuel, at present it is the type envisaged in all, current national plans for FBR power systems. The corresponding fuel cycle, the uranium-plutonium breeder reactor fuel cycle, is basically the same as the thermal reactor fuel cycle - the fuel is used and then reprocessed to separate the useful components from the waste products, the useful uranium and plutonium are used again and the waste disposed of safely. However the details of the cycle are significantly different from those of the thermal reactor cycle. (Auth.)

  9. Solvent extraction in the nuclear fuel cycle

    International Nuclear Information System (INIS)

    Eccles, H.; Naylor, A.

    1987-01-01

    Solvent extraction techniques have been used in the uranium nuclear fuel cycle in three main areas; concentration of uranium from ore leach liquor, purification of ore concentrates and fuel reprocessing. Solvent extraction has been extended to the removal of transuranic elements from active waste liquor, the recovery of uranium from natural sources and the recovery of noble metals from active waste liquor. Schemes are presented for solvent extraction of uranium using the Amex or Dapex process; spent fuel reprocessing and the Purex process. Recent and future developments of the techniques are outlined. (UK)

  10. Advantages of co-located spent fuel reprocessing, repository and underground reactor facilities

    International Nuclear Information System (INIS)

    Mahar, James M.; Kunze, Jay F.; Wes Myers, Carl; Loveland, Ryan

    2007-01-01

    The purpose of this work is to extend the discussion of potential advantages of the underground nuclear park (UNP) concept by making specific concept design and cost estimate comparisons for both present Generation III types of reactors and for some of the modular Gen IV or the GNEP modular concept. For the present Gen III types, we propose co-locating reprocessing and (re)fabrication facilities along with disposal facilities in the underground park. The goal is to determine the site costs and facility construction costs of such a complex which incorporates the advantages of a closed fuel cycle, nuclear waste repository, and ultimate decommissioning activities all within the UNP. Modular power generation units are also well-suited for placement underground and have the added advantage of construction using current and future tunnel boring machine technology. (authors)

  11. Status of the technical project design phase of the German Waste Management Center

    International Nuclear Information System (INIS)

    Mischke, J.

    1978-01-01

    Under the waste management concept of the German Federal Government the utilities are to assume responsibility for waste management of the German nuclear power plants within the framework of the polluter pays principle, the ultimate storage of radioactive waste remaining a responsibility of the government. The duties of industry chiefly include planning, construction and operation of the facilities for fuel element storage, reprocessing and waste treatment and for processing the recovered nuclear fuel. The German utilities operating and planning nuclear power plants have set up the Deutsche Gesellschaft fuer Wiederaufarbeitung von Kernbrennstoffen mbH (DWK), which is to build the Waste Management Center and also works on the interim solutions planned for continuous waste management up to the completion of the planned Waste Management Center. For this purpose, DWK plans to construct temporary fuel storage facilities and has entered into agreements to secure reprocessing abroad of fuel elements from German nuclear power plants. In discharging its obligations DWK has acquired the extensive know-how available in the Federal Republic in the field of reprocessing spent fuel elements. (orig.) [de

  12. Nuclear power and its fuel cycle

    International Nuclear Information System (INIS)

    Wymer, R.G.

    1986-01-01

    A series of viewgraphs describes the nuclear fuel cycle and nuclear power, covering reactor types, sources of uranium, enrichment of uranium, fuel fabrication, transportation, fuel reprocessing, and radioactive wastes

  13. Integrated radioactive waste management from NPP, research reactor and back end of nuclear fuel cycle - an Indian experience

    International Nuclear Information System (INIS)

    Kumar, S.; Ali, S.S.; Chander, M.; Bansal, N.K.; Balu, K.

    2001-01-01

    India is one of the developing countries operating waste management facilities for entire nuclear fuel cycle for the last three decades. Over the years, the low and intermediate level (LIL) liquid waste streams arising from reactors and fuel reprocessing facilities have been well characterised and different processes for treatment, conditioning and disposal are being practised. LIL waste generated in nuclear facilities is treated by chemical treatment processes where majority of the activity is retained in the form of sludge. Decontamination factors ranging from 10 to 1000 are achieved depending upon the process employed and characteristics of the waste. At an inland PHWR site at Rajasthan, the LIL waste is concentrated by solar evaporation. To augment the treatment capability, a plant is being set up at Trombay to treat LIL waste based on reverse osmosis process. Alkaline waste of intermediate level activity is being treated by using indigenously developed resorcinol formaldehyde resin. Solid radioactive waste is volume reduced by compacting, baling and incineration depending on the nature of the waste. Cement matrix is employed for immobilisation of process concentrate such as chemical sludge, ash from incinerators etc. The solid waste, depending on the activity contents, is disposed in underground engineered trenches in near surface disposal facility. Bore well samples around the trench are drawn periodically to ascertain the effectiveness of the disposal system. The gaseous waste is treated at the source itself. High efficiency particulate air (HEPA) filter and impregnated activated carbon is employed to restrict the release of airborne activity to the environment. Radioactive waste discharges are kept well below the authorised limits prescribed by the regulatory authorities. This paper covers the waste management practices being adopted in India for treatment, conditioning, interim storage and disposal of low and intermediate level waste arising from the

  14. Safety problems in fuel reprocessing plants

    International Nuclear Information System (INIS)

    Amaury, P.; Jouannaud, C.; Niezborala, F.

    1979-01-01

    The document first situates the reprocessing in the fuel cycle as a whole. It shows that a large reprocessing plant serves a significant number of reactors (50 for a plant of 1500 tonnes per annum). It then assesses the potential risks with respect to the environment as well as with respect to the operating personnel. The amounts of radioactive matter handled are very significant and their easily dispersible physical form represents very important risks. But the low potential energy likely to bring about this dispersion and the very severe and plentiful confinement arrangements are such that the radioactive risks are very small, both with respect to the environment and the operating personnel. The problems of the interventions for maintenance or repairs are mentioned. The intervention techniques in a radioactive environment are perfected, but they represent the main causes of operating personnel irradiation. The design principle applied in the new plants take this fact into account, involving a very significant effort to improve the reliability of the equipment and ensuring the provision of devices enabling the failing components to be replaced without causing irradiation of the personnel [fr

  15. Progress on the treatment of radioactive waste from reprocessing facilities

    International Nuclear Information System (INIS)

    Krause, H.

    With the opening of large-scale reprocessing plants, waste treatment will have to be dealt with on a new order of magnitude. Fundamental solutions to the waste problems are visible in the current lectures. Many procedures are still under study at the laboratory scale or somewhat above; much, therefore, remains to be done in order to bring such procedures to the requisite large scale magnitude in the available short time. Much also remains to be accomplished in the way of improving processes which are barely adequate, and rendering them completely satisfactory for an effective waste disposal system

  16. Importance of nuclear fuel reprocessing

    International Nuclear Information System (INIS)

    Allday, C.

    1977-01-01

    The following topics are discussed: world energy requirements; energy conservation and the economics of recycle environmental considerations and the timescale of reprocessing; and problems associated with reprocessing. The conclusion is reached that reprocessing is essential to the conservation of the world's energy resources and is an environmentally, and probably an economically, more acceptable option to the ''throw away'' alternative

  17. Reprocessing of spent nuclear fuel; Prerada isluzenog nuklearnog goriva

    Energy Technology Data Exchange (ETDEWEB)

    Gal, I [Institute of Nuclear Sciences Boris Kidric, Laboratorija za visoku aktivnost, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    This report covers: chemical-technology investigation of modified purex process for reprocessing of spent fuel; implementation of the procedure for obtaining plutonium peroxide and oxalate; research in the field of uranium, plutonium, and fission products separation by inorganic ion exchangers and extraction by organic solutions; study of the fission products in the heavy water RA reactor.

  18. Airborne effluent control for LMFBR fuel reprocessing plants

    International Nuclear Information System (INIS)

    Yarbro, O.O.; Groenier, W.S.; Stephenson, M.J.

    1976-01-01

    A significant part of the LMFBR fuel reprocessing development program has been devoted to the development of efficient removal systems for the volatile fission products, including 131 I, krypton, tritium, 129 I, and most recently 14 C. Flowsheet studies have indicated that very significant reductions of radioactive effluents can be achieved by integrating advanced effluent control systems with new concepts of containment and ventilation; however, the feasibility of such has not yet been established, nor have the economics been examined. This paper presents a flowsheet for the application of advanced containment systems to the processing of LMFBR fuels and summarizes the status and applicability of specific fission product removal systems

  19. HTGR fuel reprocessing pilot plant: results of the sequential equipment operation

    International Nuclear Information System (INIS)

    Strand, J.B.; Fields, D.E.; Kergis, C.A.

    1979-05-01

    The second sequential operation of the HTGR fuel reprocessing cold-dry head-end pilot plant equipment has been successfully completed. Twenty standard LHGTR fuel elements were crushed to a size suitable for combustion in a fluid bed burner. The graphite was combusted leaving a product of fissile and fertile fuel particles. These particles were separated in a pneumatic classifier. The fissile particles were fractured and reburned in a fluid bed to remove the inner carbon coatings. The remaining products are ready for dissolution and solvent extraction fuel recovery

  20. Laser-enhanced chemical reactions and the liquid state. II. Possible applications to nuclear fuel reprocessing

    International Nuclear Information System (INIS)

    DePoorter, G.L.; Rofer-DePoorter, C.K.

    1976-01-01

    Laser photochemistry is surveyed as a possible improvement upon the Purex process for reprocessing spent nuclear fuel. Most of the components of spent nuclear fuel are photochemically active, and lasers can be used to selectively excite individual chemical species. The great variety of chemical species present and the degree of separation that must be achieved present difficulties in reprocessing. Lasers may be able to improve the necessary separations by photochemical reaction or effects on rates and equilibria of reactions