WorldWideScience

Sample records for frmac operations revision

  1. Overview of FRMAC Operations. Revision 2

    International Nuclear Information System (INIS)

    1994-07-01

    The purpose of this overview of the Federal Radiological Monitoring and Assessment Center (FRMAC) operations is to describe the FRMAC response to a major radiological emergency and to describe the subsequent response activities which provide radiological monitoring and assessment outside the immediate boundaries of the radiological emergency site. In the event of a major radiological emergency, Federal agencies with various statutory responsibilities have agreed to coordinate their efforts at the emergency scene under the umbrella of the Federal Radiological emergency Response Plan (FRERP). This cooperative effort will assure the State(s) and a designed Lead Federal Agency (LFA) that all Federal radiological assistance is fully supporting their efforts to protect the public and will provide monitoring and assessment results for their immediate use in decision making. The Federal agencies do not relinquish their statutory responsibilities. However, the mandated Federal cooperation ensures that each agency can obtain the data critical to its specific responsibilities

  2. FRMAC Operations Manual

    Energy Technology Data Exchange (ETDEWEB)

    Frandsen, K.

    2010-05-01

    In the event of a major radiological incident, the Federal Radiological Monitoring and Assessment Center (FRMAC) will coordinate the federal agencies that have various statutory responsibilities. The FRMAC is responsible for coordinating all environmental radiological monitoring, sampling, and assessment activities for the response. This manual describes the FRMAC’s response activities in a radiological incident. It also outlines how FRMAC fits in the National Incident Management System (NIMS) under the National Response Framework (NRF) and describes the federal assets and subsequent operational activities which provide federal radiological monitoring and assessment of the affected areas. In the event of a potential or existing major radiological incident, the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is responsible for establishing and managing the FRMAC during the initial phases.

  3. Federal Radiological Monitoring and Assessment Center (FRMAC) overview of FRMAC operations

    International Nuclear Information System (INIS)

    1996-02-01

    In the event of a major radiological emergency, 17 federal agencies with various statutory responsibilities have agreed to coordinate their efforts at the emergency scene under the umbrella of the Federal Radiological Emergency Response plan (FRERP). This cooperative effort will assure the designated Lead Federal Agency (LFA) and the state(s) that all federal radiological assistance fully supports their efforts to protect the public. The mandated federal cooperation ensures that each agency can obtain the data critical to its specific responsibilities. This Overview of the Federal Radiological Monitoring and Assessment Center (FRMAC) Operations describes the FRMAC response activities to a major radiological emergency. It also describes the federal assets and subsequent operational activities which provide federal radiological monitoring and assessment of the off-site areas. These off-site areas may include one or more affected states

  4. FRMAC-93 lessons learned report

    International Nuclear Information System (INIS)

    Kerns, K.C.

    1994-03-01

    FRMAC-93 simulated a radiological accident at the Fort Calhoun nuclear power plant, 25 miles north of Omaha, Nebraska. The exercise involved the state Iowa and Nebraska, NRC as the lead Federal agency, FRMAC (Federal Radiological Monitoring and Assessment Center), and several federal agencies with statutory emergency responsibility. FRMAC-93 was a major 2-day field exercise designed to determine the effectiveness, coordination, and operations of a DOE-managed FRMAC. Other objectives were to ensure that appropriate priorities were established and assistance was provided to the states and the lead Federal agency by FRMAC. Day 1 involved the Fort Calhoun evaluated plume phase exercise. On Day 2, the flow of data, which was slow initially, improved so that confidence of states and other federal responders in FRMAC support capabilities was high. The impact and lessons learned from FRMAC-93 provided the necessary impetus to make organizational and operational changes to the FRMAC program, which were put into effect in the DOE exercise FREMONT at Hanford 3 months later

  5. Federal Radiological Monitoring and Assessment Center Overview of FRMAC Operations

    International Nuclear Information System (INIS)

    1998-01-01

    In the event of a major radiological emergency, 17 federal agencies with various statutory responsibilities have agreed to coordinate their efforts at the emergency scene under the umbrella of the Federal Radiological Emergency Response Plan. This cooperative effort will ensure that all federal radiological assistance fully supports their efforts to protect the public. the mandated federal cooperation ensures that each agency can obtain the data critical to its specific responsibilities. This Overview of Federal Radiological Monitoring and Assessment Center (FRMAC) describes the FRMAC response activities to a major radiological emergency. It also describes the federal assets and subsequent operational activities which provide federal radiological monitoring and assessment of the off-site areas

  6. The future of FRMAC assessment

    International Nuclear Information System (INIS)

    Laiche, Thomas P.

    2010-01-01

    FRMAC was born out of circumstances 25 years ago when 17 federal agencies descended on the states with good intention during the Three-Mile Island nuclear power plant incident. At that time it quickly became evident that a better way was needed to support state and local governments in their time of emergency and recovery process. FRMAC's single voice of Federal support coordinates the multiple agencies that respond to a radiological event. Over the years, FRMAC has exercised, evaluated, and honed its ability to quickly respond to the needs of our communities. As the times have changed, FRMAC has expanded its focus from nuclear power plant incidents, to threats of a terrorist radiological dispersal device (RDD), to the unthinkable - an Improvised nuclear device (IND). And just as having the right tools are part of any trade, FRMAC's tool set has and is evolving to meet contemporary challenges - not just to improve the time it takes to collect data and assess the situation, but to provide a quality and comprehensive product that supports a stressed decision maker, responsible for the protection of the public. Innovations in the movement of data and information have changed our everyday lives. So too, FRMAC is capitalizing on industry innovations to improve the flow of information: from the early predictive models, to streamlining the process of getting data out of the field; to improving the time it takes to get assessed products in to the hands of the decision makers. FRMAC is focusing on the future through the digital age of electronic data processing. Public protective action and dose avoidance is the challenge.

  7. Turbo FRMAC 2018

    Energy Technology Data Exchange (ETDEWEB)

    2017-11-30

    The Turbo FRMAC (TF) software program is the software implementation of the science and methodologies utilized in the Federal Radiological Monitoring and Assessment Center (FRMAC). The software automates the calculations described in volumes 1 of "The Federal Manual for Assessing Environmental Data during a Radiological Emergency" (2015 version). In the event of the intentional or accidental release of radioactive material, the software is used to guide and govern the response of the Federal, State, Local, and Tribal governments. The manual, upon which the software is based, is unclassified and freely available on the Internet.

  8. Federal Radiological Monitoring and Assessment Center (FRMAC): Overview of FRMAC operations

    International Nuclear Information System (INIS)

    1993-09-01

    The purpose of this Management Overview of the Federal Radiological Monitoring and Assessment Center (FRMAC) is to explain the federal preparation for a radiological accident and to describe the subsequent response activities which provide radiological monitoring and assessment outside the boundaries of the monitoring which support the radiological accident site. In the event of a radiological accident, federal agencies with various statutory responsibilities have agreed to coordinate their efforts at the accident scene under the umbrella of the Federal Radiological Emergency Response Plan (FRERP). This cooperative effort will assure the state(s) and the Lead Federal Agency (LFA) that all federal technical assistance is fully supporting their efforts to protect the public and will provide these monitoring results in a working data center for immediate use by the state(s) and LFA decision makers. The federal agencies do not relinquish their statutory responsibilities. However, the mandated federal cooperation ensures that each agency can obtain the data critical to its specific responsibility

  9. FRMAC Updates

    International Nuclear Information System (INIS)

    Mueller, P.

    1995-01-01

    This talks describes updates in the following updates in FRMAC publications concerning radiation emergencies: Monitoring and Analysis Manual; Evaluation and Assessment Manual; Handshake Series (Biannual) including exercises participated in; environmental Data and Instrument Transmission System (EDITS); Plume in a Box with all radiological data stored onto a hand-held computer; and courses given

  10. Summary Report for the Evaluation of Current QA Processes Within the FRMAC FAL and EPA MERL.

    Energy Technology Data Exchange (ETDEWEB)

    Shanks, Sonoya T.; Ted Redding; Lynn Jaussi; Allen, Mark B.; Fournier, Sean Donovan; Leonard, Elliott J.

    2017-04-01

    The Federal Radiological Monitoring and Assessment Center (FRMAC) relies on accurate and defensible analytical laboratory data to support its mission. Therefore, FRMAC must ensure that the environmental analytical laboratories providing analytical services maintain an ongoing capability to provide accurate analytical results to DOE. It is undeniable that the more Quality Assurance (QA) and Quality Control (QC) measures required of the laboratory, the less resources that are available for analysis of response samples. Being that QA and QC measures in general are understood to comprise a major effort related to a laboratory’s operations, requirements should only be considered if they are deemed “value-added” for the FRMAC mission. This report provides observations of areas for improvement and potential interoperability opportunities in the areas of Batch Quality Control Requirements, Written Communications, Data Review Processes, Data Reporting Processes, along with the lessons learned as they apply to items in the early phase of a response that will be critical for developing a more efficient, integrated response for future interactions between the FRMAC and EPA assets.

  11. Role of the Federal Radiological Monitoring and Assessment Center (FRMAC) following a radiological accident

    International Nuclear Information System (INIS)

    Doyle, J.F. III.

    1986-01-01

    The Federal Radiological Emergency Response Plan (FRERP) calls for the Department of Energy to establish a Federal Radiological Monitoring and Assessment Center (FRMAC) immediately following a major radiological accident to coordinate all federal off-site monitoring efforts in support of the State and the Cognizant Federal Agency (CFA) for the facility or material involved in the accident. Some accidents are potentailly very complex and may require hundreds of radiation specialists to ensure immediate protection of the public and workers in the area, and to identify priorities for the Environmental Protection Agency (EPA) long-term efforts once the immediate protective actions have been carried out. The FRMAC provides a working environment with today's high technology tools (i.e., communication, computers, management procedures, etc.) to assure that the State and CFA decision makers have the best possible information in a timely manner on which to act. The FRMAC planners also recognize an underlying responsibility to continuously document such operations in order to provide the State, the CFA, and the EPA the technical information they will require for long term assessments. In addition, it is fully recognized that information collected and actions taken by the FRMAC will be subjected to the same scrutiny as other parts of the accident and the overall response

  12. Implementation of the National Incident Management System (NIMS)/Incident Command System (ICS) in the Federal Radiological Monitoring and Assessment Center(FRMAC) - Emergency Phase

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    Homeland Security Presidential Directive HSPD-5 requires all federal departments and agencies to adopt a National Incident Management System (NIMS)/Incident Command System (ICS) and use it in their individual domestic incident management and emergency prevention, preparedness, response, recovery, and mitigation programs and activities, as well as in support of those actions taken to assist state and local entities. This system provides a consistent nationwide template to enable federal, state, local, and tribal governments, private-sector, and nongovernmental organizations to work together effectively and efficiently to prepare for, prevent, respond to, and recover from domestic incidents, regardless of cause, size, or complexity, including acts of catastrophic terrorism. This document identifies the operational concepts of the Federal Radiological Monitoring and Assessment Center's (FRMAC) implementation of the NIMS/ICS response structure under the National Response Plan (NRP). The construct identified here defines the basic response template to be tailored to the incident-specific response requirements. FRMAC's mission to facilitate interagency environmental data management, monitoring, sampling, analysis, and assessment and link this information to the planning and decision staff clearly places the FRMAC in the Planning Section. FRMAC is not a mitigating resource for radiological contamination but is present to conduct radiological impact assessment for public dose avoidance. Field monitoring is a fact-finding mission to support this effort directly. Decisions based on the assessed data will drive public protection and operational requirements. This organizational structure under NIMS is focused by the mission responsibilities and interface requirements following the premise to provide emergency responders with a flexible yet standardized structure for incident response activities. The coordination responsibilities outlined in the NRP are based on the NIMS

  13. The role of the LLNL Atmospheric Release Advisory Capability in a FRMAC response to a nuclear power plant incident

    International Nuclear Information System (INIS)

    Baskett, R.L.; Sullivan, T.J.; Ellis, J.S.; Foster, C.S.

    1994-01-01

    The Federal Radiological Emergency Response Plan (FRERP) can provide several emergency response resources in response to a nuclear power plant (NPP) accident if requested by a state or local agency. The primary FRERP technical resources come from the US Department of Energy's (DOE) Federal Radiological Monitoring and Assessment Center (FRMAC). Most of the FRMAC assets are located at the DOE Remote Sensing Laboratory (RSL) at Nellis Air Force Base, Las Vegas, Nevada. In addition, the primary atmospheric dispersion modeling and dose assessment asset, the Atmospheric Release Advisory Capability (ARAC) is located at Lawrence Livermore National Laboratory (LLNL) in Livermore, California. In the early stages of a response, ARAC relies on its automatic worldwide meteorological data acquisition via the Air Force Global Weather Center (AFGWC). The regional airport data are supplemented with data from on-site towers and sodars and the National Oceanographic ampersand Atmospheric Administration's (NOAA) field-deployable real-time rawinsonde system. ARAC is prepared with three-dimensional regional-scale diagnostic dispersion model to simulate the complex mixed fission product release from a reactor accident. The program has been operational for 18 years and is presently developing its third generation system. The current modernization includes faster central computers, a new site workstation system. The current modernization includes faster central computers, a new site workstation system, improvements in its diagnostic dispersion models, addition of a new hybrid-particle source term, and implementation of a mesoscale prognostic model. AS these new capabilities evolve, they will be integrated into the FRMAC's field-deployable assets

  14. Proposed method to calculate FRMAC intervention levels for the assessment of radiologically contaminated food and comparison of the proposed method to the U.S. FDA's method to calculate derived intervention levels

    Energy Technology Data Exchange (ETDEWEB)

    Kraus, Terrence D.; Hunt, Brian D.

    2014-02-01

    This report reviews the method recommended by the U.S. Food and Drug Administration for calculating Derived Intervention Levels (DILs) and identifies potential improvements to the DIL calculation method to support more accurate ingestion pathway analyses and protective action decisions. Further, this report proposes an alternate method for use by the Federal Emergency Radiological Assessment Center (FRMAC) to calculate FRMAC Intervention Levels (FILs). The default approach of the FRMAC during an emergency response is to use the FDA recommended methods. However, FRMAC recommends implementing the FIL method because we believe it to be more technically accurate. FRMAC will only implement the FIL method when approved by the FDA representative on the Federal Advisory Team for Environment, Food, and Health.

  15. Federal Radiological Monitoring and Assessment Center Monitoring Manual Volume 1, Operations

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Aerial Measurement Systems

    2012-07-31

    The Monitoring division is primarily responsible for the coordination and direction of: Aerial measurements to delineate the footprint of radioactive contaminants that have been released into the environment. Monitoring of radiation levels in the environment; Sampling to determine the extent of contaminant deposition in soil, water, air and on vegetation; Preliminary field analyses to quantify soil concentrations or depositions; and Environmental and personal dosimetry for FRMAC field personnel, during a Consequence Management Response Team (CMRT) and Federal Radiological Monitoring and Assessment Center (FRMAC) response. Monitoring and sampling techniques used during CM/FRMAC operations are specifically selected for use during radiological emergencies where large numbers of measurements and samples must be acquired, analyzed, and interpreted in the shortest amount of time possible. In addition, techniques and procedures are flexible so that they can be used during a variety of different scenarios; e.g., accidents involving releases from nuclear reactors, contamination by nuclear waste, nuclear weapon accidents, space vehicle reentries, or contamination from a radiological dispersal device. The Monitoring division also provides technicians to support specific Health and Safety Division activities including: The operation of the Hotline; FRMAC facility surveys; Assistance with Health and Safety at Check Points; and Assistance at population assembly areas which require support from the FRMAC. This volume covers deployment activities, initial FRMAC activities, development and implementation of the monitoring and assessment plan, the briefing of field teams, and the transfer of FRMAC to the EPA.

  16. FRMAC Mission Analysis: What is it, and why is it useful?

    International Nuclear Information System (INIS)

    Rhonda Hopkins

    2008-01-01

    In 2002, the Director of the U.S. Department of Energy's (DOE's) National Nuclear Security Administration, Division of Emergency Response, requested a team of DOE scientists, considered experts in the field of radiological consequence management, assemble and construct a mission analysis upon which the DOE could build its response program and plan for future requirements. The team developed five scenarios upon which to build the data quality objectives (DQOs) that they considered necessary to ensure a comprehensive consequence management response from the DOE perspective. The resulting document was called the Consequence Management Mission Analysis. Based upon the positive reaction to this document and its obvious benefit to the Consequence Management mission, it was decided to expand the scope of the document to cover a mission analysis of the entire Federal Radiological Monitoring and Assessment Center (FRMAC) mission. The documentation team was expanded to include representatives from all signatories to the National Response Plan who have a role in responding to radiological emergencies. The scope of the FRMAC Mission Analysis includes all federal response resources which are activated to provide rapid support to affected state and local governments in the form of radiological monitoring and dose assessment activities at the incident site. An analysis of the necessary resources was performed to determine the required numbers and types of responders, in addition to the procedures and equipment necessary for performing the monitoring and dose assessment activities from the time the federal assets arrive at the site through the first week of the incident. The five scenarios that were considered were: (1) Nuclear Detonation; (2) Nuclear Reactor Incident or Event Involving Significant Release; (3) Alpha Radiological Dispersal Devise or Failed Improvised Nuclear Device; (4) Beta-Gamma Radiological Dispersal Device; and (5) Psychological Threat

  17. Federal Radiological Monitoring and Assessment Center Phased Response Operations

    International Nuclear Information System (INIS)

    Riland, C.A.; Bowman, D.R.

    1999-01-01

    A Federal Radiological Monitoring and Assessment Center (FRMAC) is established in response to the Lead Federal Agency (LFA) or state request when a major radiological emergency is anticipated of has occurred. The FRMAC becomes a coalition of federal off-site monitoring and assessment activities to assist the LFA, state(s), local, and tribal authorities. State, local, and tribal authorities are invited to co-locate and prioritize monitoring and assessment efforts in the FRMAC. The Department of Energy is tasked by the Federal Radiological Emergency Response Plan to coordinate the FRMAC

  18. Development of a health and safety manual for emergency response operations

    International Nuclear Information System (INIS)

    Riland, C.A.; Junio, S.S.

    2000-01-01

    The Federal Radiological Monitoring and Assessment Center (FRMAC) Health and Safety Manual, which has been under development by a multi-agency group, is nearing completion and publication. The manual applies to offsite monitoring during a radiological accident or incident. Though written for multi-agency offsite monitoring activities (FRMAC), the manual is generic in nature and should be readily adaptable for other emergency response operations. Health and safety issues for emergency response situations often differ from those of normal operations. Examples of these differences and methodologies to address these issues are discussed. Challenges in manual development, including lack of regulatory and guidance documentation, are also discussed. One overriding principle in the Health and Safety Manual development is the overall reduction of risk, not just dose. The manual is broken into several chapters, which include Overview of Responsibities, Health Physics, Industrial Hygiene and Safey, Medical, and Environmental Compliance and Records. Included is a series of appendices, which presents additional information on forms and plans for default scenarios

  19. Operator licensing examination standards for power reactors. Interim revision 8

    International Nuclear Information System (INIS)

    1997-01-01

    These examination standards are intended to assist NRC examiners and facility licensees to better understand the processes associated with initial and requalification examinations. The standards also ensure the equitable and consistent administration of examinations for all applicants. These standards are for guidance purposes and are not a substitute for the operator licensing regulations (i.e., 10 CFR Part 55), and they are subject to revision or other changes in internal operator licensing policy. This interim revision permits facility licensees to prepare their initial operator licensing examinations on a voluntary basis pending an amendment to 10 CFR Part 55 that will require facility participation. The NRC intends to solicit comments on this revision during the rulemaking process and to issue a final Revision 8 in conjunction with the final rule

  20. Methods for implementing revisions to emergency operating procedures. Final report

    International Nuclear Information System (INIS)

    Myers, L.B.; Bell, A.J.

    1984-05-01

    In response to the Three Mile Island (TMI) accident, the US Nuclear Regulatory Commission (NRC) has published the TMI Action Plan. The TMI Action Plan Item I.C.1 called for the upgrading of Emergency Operating Procedures (EOPs) at nuclear power plants. The program developed from this Action Plan item has resulted in utility efforts to: (1) revise EOPs; (2) train personnel in the use of the EOPs; and (3) implement the revised EOPs. The NRC supported the study presented in this report to identify factors which influence the effectiveness of training and implementation of revised EOPs. The NRC's major concern was the possible effects of negative transfer of training. The report includes a summary of existing methods for implementing revisions to procedures based on interviews of plant personnel, a review of the training literature applicable to the effect of previously learned procedures on the learning of and performance with revised procedures (i.e., negative transfer) and recommendations of methods and schedules for implementing revised EOPs. While the study found that the concern over negative transfer of training was not as great as anticipated, several recommendations were made. These include: (1) overtraining of operators to reduce the effect of observed negative transfer; and (2) implementation of the revised EOPs as soon as possible after training to minimize the time operators must rely upon the old EOPs after having been trained on the revised EOPs. The results of the study should be useful both to the utilities and the NRC in the development and review of EOP implementation programs

  1. Non-Power Reactor Operator Licensing Examiner Standards. Revision 1

    International Nuclear Information System (INIS)

    1995-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience

  2. Non-Power Reactor Operator Licensing Examiner Standards. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience.

  3. FFTF operations procedures preparation guide. Revision 2

    International Nuclear Information System (INIS)

    1976-12-01

    The Guide is intended to provide guidelines for the initial preparation of FFTF Operating Procedures. The Procedures Preparation Guide was developed from the plan presented and approved in the FFTF Reactor Plant Procedures Plan, PC-1, Revision 3

  4. Revision Hip Arthroscopy: A Systematic Review of Diagnoses, Operative Findings, and Outcomes.

    Science.gov (United States)

    Cvetanovich, Gregory L; Harris, Joshua D; Erickson, Brandon J; Bach, Bernard R; Bush-Joseph, Charles A; Nho, Shane J

    2015-07-01

    To determine indications for, operative findings of, and outcomes of revision hip arthroscopy. A systematic review was registered with PROSPERO and performed based on PRISMA (Preferred Reporting Items for Systematic Reviews and Meta-Analyses) guidelines. Therapeutic clinical outcome studies reporting the indications for, operative findings of, and outcomes of revision hip arthroscopy were eligible for inclusion. All study-, patient-, and hip-specific data were extracted and analyzed. The Modified Coleman Methodology Score was used to assess study quality. Five studies were included (348 revision hip arthroscopies; 333 patients; mean age, 31.4 ± 4.2 years; 60% female patients). All 5 studies were either Level III or IV evidence. The surgeon performing revision hip arthroscopy was the same as the primary hip surgeon in only 25% of cases. The mean time between primary and revision hip arthroscopy was 27.8 ± 7.0 months (range, 2 to 193 months). Residual femoroacetabular impingement was the most common indication for and operative finding of revision hip arthroscopy (81% of cases). The most commonly reported revision procedures were femoral osteochondroplasty (24%) and acetabuloplasty (18%). The modified Harris Hip Score was used in all 5 analyzed studies, with significant (P arthroscopy, subsequent reported operations were hip arthroplasty in 11 patients and re-revision hip arthroscopy in 8 patients (5% total reoperation rate). Revision hip arthroscopy is most commonly performed for residual femoroacetabular impingement, with statistically significant and clinically relevant improvements shown in multiple patient-reported clinical outcome scores at short-term follow-up. The reoperation rate after revision hip arthroscopy is 5% within 2 years, including further arthroscopy or conversion to hip arthroplasty. Level IV, systematic review of Level III and IV studies. Copyright © 2015 Arthroscopy Association of North America. Published by Elsevier Inc. All rights reserved.

  5. Federal Radiological Monitoring and Assessment Center Monitoring Manual Volume 2, Radiation Monitoring and Sampling

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Aerial Measurement Systems

    2012-07-31

    The FRMAC Monitoring and Sampling Manual, Volume 2 provides standard operating procedures (SOPs) for field radiation monitoring and sample collection activities that are performed by the Monitoring group during a FRMAC response to a radiological emergency.

  6. Selective application of revised source terms to operating nuclear power plants

    International Nuclear Information System (INIS)

    Moon, Joo Hyun; Song, Jae Hyuk; Lee, Young Wook; Ko, Hyun Seok; Kang, Chang Sun

    2001-01-01

    More than 30 years later since 1962 when TID-14844 was promulgated, there has been big change of the US NRC's regulatory position in using accident source terms for radiological assessment following a design basis accident (DBA). To replace the instantaneous source terms of TID-14844, the time-dependent source terms of NUREG-1465 was published in 1995. In the meantime, the radiological acceptance criteria for reactor site evaluation in 10 CFR Part 100 were also revised. In particular, the concept of total effective dose equivalent has been incorporated in accordance with the radiation protection standards set forth in revised 10 CFR Part 20. Subsequently, the publication of Regulatory Guide 1.183 and the revision of Standard Review Plan 15.0.1 followed in 2000, which provided the licensee of operating nuclear power reactor with the acceptable guidance of applying the revised source term. The guidance allowed the holder of an operating license issued prior to January 10, 1997 to voluntarily revise the accident source terms used in the radiological consequence analyses of DBA. Regarding to its type of application, there suggested full and selective applications, Whether it is full or selective, based upon the scope and nature of associated plant modifications being proposed, the actual application of the revised source terms to an operating plant is expected to give a large impact on its facility design basis. Considering scope and cost of the analyses required for licensing, selective application is seemed to be more appealing to an licensee of the operating plant rather than full application. In this paper, hence, the selective application methodology is reviewed and is actally applied to the assessment of offsite radiological consequence following a LOCA at Ulchin Unit 3 and 4, in order to identify and analyze the potential impacts due to application of revised source terms and to assess the considerations taken in each application prior to its actual

  7. Experiences of an Engineer working in Reactor Safety and Emergency Response

    Science.gov (United States)

    Osborn, Douglas

    2015-04-01

    The U.S. Department of Energy's Federal Radiological Monitoring and Assessment Center Consequence Management Home Team (FRMAC/CMHT) Assessment Scientist's roles, responsibilities incorporate the FRMAC with other federal, state, and local agencies during a nuclear/radiological emergency. Before the Consequence Management Response Team arrives on-site, the FRMAC/CMHT provides technical and logistical support to the FRMAC and to state, local, and tribal authorities following a nuclear/radiological event. The FRMAC/CMHT support includes analyzing event data, evaluating hazards that relate to protection of the public, and providing event information and data products to protective action decision makers. The Assessment Scientist is the primary scientist responsible for performing calculations and analyses and communicating results to the field during any activation of the FRMAC/CMHT assets. As such, the FRMAC/CMHT Assessment Scientist has a number of different roles and responsibilities to fill depending upon the type of response that is required. Additionally, the Sandia National Laboratories (SNL) Consequence Assessment Team (CAT) Consequence Assessor roles, responsibilities involve hazardous materials operational emergency at SNL New Mexico facilities (SNL/NM) which include loss of control over radioactive, chemical, or explosive hazardous materials. When a hazardous materials operational emergency occurs, key decisions must be made in order to regain control over the hazards, protect personnel from the effects of the hazards, and mitigate impacts on operations, facilities, property, and the environment. Many of these decisions depend in whole or in part on the evaluation of potential consequences from a loss of control over the hazards. As such, the CAT has a number of different roles and responsibilities to fill depending upon the type of response that is required. Primary consequence-based decisions supported by the CAT during a hazardous materials operational

  8. Federal Radiological Monitoring and Assessment Center advanced part phase response actions

    International Nuclear Information System (INIS)

    Hurley, B.

    1997-01-01

    Federal Radiological Monitoring and Assessment Center (FRMAC) response actions are carried out in Advance Party and Main Party phases of deployment. Response activities are initiated by a FRMAC Home Team prior to and during Advance Party deployment, with Home Team support continuing until the FRMAC Main Party is fully deployed. Upon arrival at the incident scene, the Advance Party establishes communications with other federal, state, and local response organizations, Following an Advance Party Meeting with these response organizations, FRMAC begins formulation of an initial monitoring and sampling plan, in coordination with the jurisdictional state and the Lead Federal Agency, and initiates detailed logistical arrangements for Main Party deployment and operations

  9. The Evolution of the Federal Monitoring and Assessment Center

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Aerial Measurement System

    2012-07-31

    The Federal Radiological Monitoring and Assessment Center (FRMAC) is a federal emergency response asset whose assistance may be requested by the Department of Homeland Security (DHS), the Department of Defense (DoD), the Environmental Protection Agency (EPA), the Nuclear Regulatory Commission (NRC), and state and local agencies to respond to a nuclear or radiological incident. It is an interagency organization with representation from the Department of Energy’s National Nuclear Security Administration (DOE/NNSA), the Department of Defense (DoD), the Environmental Protection Agency (EPA), the Department of Health and Human Services (HHS), the Federal Bureau of Investigation (FBI), and other federal agencies. FRMAC, in its present form, was created in 1987 when the radiological support mission was assigned to the DOE’s Nevada Operations Office by DOE Headquarters. The FRMAC asset, including its predecessor entities, was created, grew, and evolved to function as a response to radiological incidents. Radiological emergency response exercises showed the need for a coordinated approach to managing federal emergency monitoring and assessment activities. The mission of FRMAC is to coordinate and manage all federal radiological environmental monitoring and assessment activities during a nuclear or radiological incident within the United States in support of state,local, tribal governments, DHS, and the federal coordinating agency. Radiological emergency response professionals with the DOE’s national laboratories support the Radiological Assistance Program (RAP), National Atmospheric Release Advisory Center (NARAC), the Aerial MeasuringSystem (AMS), and the Radiation Emergency Assistance Center/Training Site (REAC/TS). These teams support the FRMAC to provide: Atmospheric transport modeling; Radiation monitoring; Radiological analysis and data assessments; and Medical advice for radiation injuries In support of field operations, the FRMAC provides geographic

  10. Federal Radiological Monitoring and Assessment Center (FRMAC), US response to major radiological accidents

    International Nuclear Information System (INIS)

    Mueller, P.G.

    2000-01-01

    radiological materials from: Nuclear Fuel Cycle Facilities, Space Craft Launches, Weapon (Department of Defence or DOE) Transportation, Weapon Production Facilities, Spacecraft Re-entry (domestic or foreign), Terrorist Incidents, High-Level Waste Transportation, Nuclear Power Plants. Key to the FRERP would be the establishment of the Federal Radiological Monitoring and Assessment Center (FRMAC). Development and implementation was assigned to DOE as the agency most capable of providing sufficient resources, assets, and support. In 1987, DOE subsequently assigned programmatic responsibility, with limited funding, to the Nevada Operations Office in Las Vegas, Nevada. (author)

  11. Revised estimates for ozone reduction by shuttle operation

    Science.gov (United States)

    Potter, A. E.

    1978-01-01

    Previous calculations by five different modeling groups of the effect of space shuttle operations on the ozone layer yielded an estimate of 0.2 percent ozone reduction for the Northern Hemisphere at 60 launches per year. Since these calculations were made, the accepted rate constant for the reaction between hydroperoxyl and nitric oxide to yield hydroxyl and nitrogen dioxide, HO2 + NO yields OH + NO2, was revised upward by more than an order of magnitude, with a resultant increase in the predicted ozone reduction for chlorofluoromethanes by a factor of approximately 2. New calculations of the shuttle effect were made with use of the new rate constant data, again by five different modeling groups. The new value of the shuttle effect on the ozone layer was found to be 0.25 percent. The increase resulting from the revised rate constant is considerably less for space shuttle operations than for chlorofluoromethane production, because the new rate constant also increases the calculated rate of downward transport of shuttle exhaust products out of the stratosphere.

  12. Laparoscopic revision of failed antireflux operations.

    Science.gov (United States)

    Serafini, F M; Bloomston, M; Zervos, E; Muench, J; Albrink, M H; Murr, M; Rosemurgy, A S

    2001-01-01

    A small number of patients fail fundoplication and require reoperation. Laparoscopic techniques have been applied to reoperative fundoplications. We reviewed our experience with reoperative laparoscopic fundoplication. Reoperative laparoscopic fundoplication was undertaken in 28 patients, 19 F and 9 M, of mean age 56 years +/- 12. Previous antireflux procedures included 19 open and 12 laparoscopic antireflux operations. Symptoms were heartburn (90%), dysphagia (35%), and atypical symptoms (30%%). The mean interval from antireflux procedure to revision was 13 months +/- 4.2. The mean DeMeester score was 78+/-32 (normal 14.7). Eighteen patients (64%) had hiatal breakdown, 17 (60%) had wrap failure, 2 (7%) had slipped Nissen, 3 (11%) had paraesophageal hernias, and 1 (3%) had an excessively tight wrap. Twenty-five revisions were completed laparoscopically, while 3 patients required conversion to the open technique. Complications occurred in 9 of 17 (53%) patients failing previous open fundoplications and in 4 of 12 patients (33%) failing previous laparoscopic fundoplications and included 15 gastrotomies and 1 esophagotomy, all repaired laparoscopically, 3 postoperative gastric leaks, and 4 pneumothoraces requiring tube thoracostomy. No deaths occurred. Median length of stay was 5 days (range 2-90 days). At a mean follow-up of 20 months +/- 17, 2 patients (7%) have failed revision of their fundoplications, with the rest of the patients being essentially asymptomatic (93%). The results achieved with reoperative laparoscopic fundoplication are similar to those of primary laparoscopic fundoplications. Laparoscopic reoperations, particularly of primary open fundoplication, can be technically challenging and fraught with complications. Copyright 2001 Academic Press.

  13. Polarized proton Target-III operators manual, revision A

    International Nuclear Information System (INIS)

    Hill, D.; Moretti, A.; Onesto, F.; Rynes, P.

    1976-04-01

    A revision is given of a manual containing standard operating procedures for the vacuum, cryogenic, and electronic systems of a polarized proton target. The discussion includes the target cryostat, the 3 He and 4 He pumping systems, remote monitors and controls, the microwave system, the magnet and power supply, the computerized polarization monitor, the 4 He liquifier and gas recovery system, and miscellaneous auxiliary equipment

  14. Development of the methodology for application of revised source term to operating nuclear power plants in Korea

    International Nuclear Information System (INIS)

    Kang, M.S.; Kang, P.; Kang, C.S.; Moon, J.H.

    2004-01-01

    Considering the current trend in applying the revised source term proposed by NUREG-1465 to the nuclear power plants in the U.S., it is expected that the revised source term will be applied to the Korean operating nuclear power plants in the near future, even though the exact time can not be estimated. To meet the future technical demands, it is necessary to prepare the technical system including the related regulatory requirements in advance. In this research, therefore, it is intended to develop the methodology to apply the revised source term to operating nuclear power plants in Korea. Several principles were established to develop the application methodologies. First, it is not necessary to modify the existing regulations about source term (i.e., any back-fitting to operating nuclear plants is not necessary). Second, if the pertinent margin of safety is guaranteed, the revised source term suggested by NUREG-1465 may be useful to full application. Finally, a part of revised source term could be selected to application based on the technical feasibility. As the results of this research, several methodologies to apply the revised source term to the Korean operating nuclear power plants have been developed, which include: 1) the selective (or limited) application to use only some of all the characteristics of the revised source term, such as release timing of fission products and chemical form of radio-iodine and 2) the full application to use all the characteristics of the revised source term. The developed methodologies are actually applied to Ulchin 9 and 4 units and their application feasibilities are reviewed. The results of this research are used as either a manual in establishing the plan and the procedure for applying the revised source term to the domestic nuclear plant from the utility's viewpoint; or a technical basis of revising the related regulations from the regulatory body's viewpoint. The application of revised source term to operating nuclear

  15. Emergency radiological monitoring and analysis: Federal Radiological Monitoring and Assessment Center

    International Nuclear Information System (INIS)

    Thome, D.J.

    1995-01-01

    The US Federal Radiological Emergency Response Plan (FRERP) provides the framework for integrating the various Federal agencies responding to a major radiological emergency. The FRERP authorizes the creation of the Federal Radiological Monitoring and Assessment Center (FRMAC), which is established to coordinate all Federal agencies involved in the monitoring and assessment of the off-site radiological conditions in support of the impacted State(s) and the Lead Federal Agency (LFA). Within the FRMAC, the Monitoring and Analysis Division (M ampersand A) is responsible for coordinating all FRMAC assets involved in conducting a comprehensive program of environmental monitoring, sampling, radioanalysis, and quality assurance. To assure consistency, completeness, and the quality of the data produced, a methodology and procedures manual is being developed. This paper discusses the structure, assets, and operations of the FRMAC M ampersand A and the content and preparation of the manual

  16. Emergency radiological monitoring and analysis United States Federal Radiological Monitoring and Assessment Center

    International Nuclear Information System (INIS)

    Thome, D.J.

    1994-01-01

    The United States Federal Radiological Emergency Response Plan (FRERP) provides the framework for integrating the various Federal agencies responding to a major radiological emergency. Following a major radiological incident the FRERP authorizes the creation of the Federal Radiological Monitoring and Assessment Center (FRMAC). The FRMAC is established to coordinate all Federal agencies involved in the monitoring and assessment of the off-site radiological conditions in support of the impacted states and the Lead Federal Agency (LFA). Within the FRMAC, the Monitoring and Analysis Division is responsible for coordinating all FRMAC assets involved in conducting a comprehensive program of environmental monitoring, sampling, radioanalysis and quality assurance. This program includes: (1) Aerial Radiological Monitoring - Fixed Wing and Helicopter, (2) Field Monitoring and Sampling, (3) Radioanalysis - Mobile and Fixed Laboratories, (4) Radiation Detection Instrumentation - Calibration and Maintenance, (5) Environmental Dosimetry, and (6) An integrated program of Quality Assurance. To assure consistency, completeness and the quality of the data produced, a methodology and procedures handbook is being developed. This paper discusses the structure, assets and operations of FRMAC monitoring and analysis and the content and preparation of this handbook

  17. The Ability of the United States Federal Radiological Monitoring and Assessment Center to Collect and Disseminate Environmental Measurements during Radiological Emergencies

    International Nuclear Information System (INIS)

    Marianno, Craig; Essex, James

    2007-01-01

    The Federal Radiological Monitoring and Assessment Center (FRMAC) is the United States response organization for radiological emergencies. The FRMAC is structured as an operations center and employs the combined resources of several federal agencies to respond to any disaster resulting in the release of radioactivity. The mission of the FRMAC is to support state and local authorities in the gathering of environmental data using an array of survey equipment ranging from alpha probes, beta/gamma probes, and high-purity germanium (HPGe) spectroscopy to the gathering of physical samples. Once collected, the data are projected on maps to assist public officials make protective action decisions. In addition to the accumulation of data, it is the legal obligation of the FRMAC to keep archival records of all data points and their actions. During an event, it is conceivable that hundreds to thousands of sample points will be recorded over a relatively short time. It is in the interest of the federal government and public that the information collected be put to the best use as fast as possible. Toward this end, the Remote Sensing Laboratory, working under the direction of the United States Department of Energy's National Nuclear Security Administration, is investigating the use of several technologies that will accelerate data flow from field teams to the FRMAC and, finally, distribution of data to decision makers and the public. Not only can finished data products be viewed through the internet, but the actual collection of data via 'real-time' telemetry can be viewed using this same method. Data from the field will be transferred directly to the FRMAC using the MCPD (multi-path communication device). This base station receives the survey information from the field teams via Bluetooth and instantly investigates the best communication pathway to transfer data to the FRMAC. Possible paths include standalone radio, commercial cellular networks (GPRS and CDMA) and satellite

  18. 78 FR 59981 - Proposed Revision to Physical Security-Standard Design Certification and Operating Reactors

    Science.gov (United States)

    2013-09-30

    ... Design Certification and Operating Reactors AGENCY: Nuclear Regulatory Commission. ACTION: Standard... Design Certification and Operating Reactors.'' The NRC seeks comments on the proposed revised section of... subject): Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2013...

  19. The Emergency Radiological Monitoring and Analysis Division of the United States Federal Radiological Monitoring and Assessment Center

    International Nuclear Information System (INIS)

    Thome, D.J.

    2000-01-01

    The U.S. Federal Radiological Emergency Response Plan (FRERP) provides the framework for integrating the various Federal agencies responding to a major radiological emergency. The FRERP authorises the creation of the Federal Radiological Monitoring and Assessment Center (FRMAC), which is established to co-ordinate all Federal agencies involved in the monitoring and assessment of the off-site radiological conditions in support of the impacted States and the Lead Federal Agency (LFA). Within the FRMAC, the Monitoring and Analysis Division is responsible for co-ordinating all FRMAC assets involved in conducting a comprehensive program of environmental monitoring, sampling, radioanalysis, and quality assurance. This program includes: 1. Aerial Radiological Monitoring - Fixed-Wing and Helicopter; 2. Field Monitoring and Sampling; 3. Radioanalysis - Mobile and Fixed Laboratories; 4. Radiation Detection Instrumentation - Calibration and Maintenance; 5. Environmental Dosimetry; 6. Integrated program of Quality Assurance. To assure consistency, completeness, and the quality of the data produced, a methodology and procedures manual is being developed. This paper discusses the structure, assets, and operations of the FRMAC Monitoring and Analysis Division and the content and preparation of the manual. (author)

  20. The impact of electrocautery method on post-operative bleeding complications after non-newborn circumcision and revision circumcision.

    Science.gov (United States)

    Harty, Niall J; Nelson, Caleb P; Cendron, Marc; Turner, Shaunna; Borer, Joseph G

    2013-10-01

    We evaluated post-operative bleeding complications in non-newborns following use of monopolar versus bipolar electrocautery for circumcision or revision circumcision. We retrospectively reviewed sequentially performed cases of circumcision and revision circumcision performed by nine pediatric urologists at our institution from 2005 to 2010. In order to incorporate both the monopolar and bipolar electrocautery experience for a single surgeon employing bipolar technique, sequential cases from 2002 to 2010 were reviewed. Variables assessed included age, procedure, method of electrocautery, skin approximation and dressing, and bleeding complications. 1810 patients that underwent either circumcision or revision circumcision were reviewed. Complete data was available for 1617 patients. Age at operation was a mean 3.7 ± 4.9 yrs and median 1.5 yrs. Return for bleeding complication for all surgeons, was 2/336 (0.6%) for bipolar and 28/1281 (2.2%) for monopolar (p = 0.0545). For the single surgeon using bipolar technique, returns were 2/336 (0.6%) for bipolar and 5/309 (1.6%) for monopolar (p = 0.2133). Returns per procedure type were 1/200 (0.5%) bipolar and 24/844 (2.8%) monopolar for primary circumcision (p = 0.0513), and 1/136 (0.7%) bipolar and 4/437 (0.9%) monopolar (p = 0.84) for revision. Four of 1617 (0.2%) patients returned to the operating room [4/1281 (0.3%) monopolar (p = 0.31)]. There was no difference in return to the operating room for circumcision versus revision. Return for bleeding complications after circumcision and revision circumcision occurred more frequently after monopolar electrocautery compared to bipolar. However, there was no significant difference between the two electrocautery methods. Either form of electrocautery appears to be effective for this common pediatric urologic procedure. Copyright © 2012 Journal of Pediatric Urology Company. Published by Elsevier Ltd. All rights reserved.

  1. High proximal migration in cemented acetabular revisions operated with bone impaction grafting; 47 revision cups followed with RSA for 17 years.

    Science.gov (United States)

    Mohaddes, Maziar; Herberts, Peter; Malchau, Henrik; Johanson, Per-Erik; Kärrholm, Johan

    2017-05-12

    Bone impaction grafting is a biologically and mechanically appealing option in acetabular revision surgery, allowing restitution of the bone stock and restoration of the biomechanics. We analysed differences in proximal migration of the revision acetabular components when bone impaction grafting is used together with a cemented or an uncemented cup. 43 patients (47 hips), revised due to acetabular loosening and judged to have less than 50% host bone-implant contact were included. The hips were randomised to either an uncemented (n = 20) or a cemented (n = 27) revision cup. Radiostereometry and radiography was performed postoperatively, at 3 and 6 months, 1, 2, 3, 5, 7, 10 and 13 and 17 years postoperatively. Clinical follow-up was performed at 1, 2 and 5 years postoperatively and thereafter at the same interval as in the radiographic follow-up. There were no differences in the base line demographic data between the 2 groups. At the last follow-up (17 years) 14 hips (10 cemented, 4 uncemented) had been re-revised due to loosening. 3 additional cups (1 uncemented and 2 cemented) were radiographically loose. There was a higher early proximal migration in the cemented cups. Cups operated on with cement showed a higher early migration measured with RSA and also a higher number of late revisions. The reason for this is not known, but factors such as inclusion of cases with severe bone defects, use of smaller bone chips and issues related to the impaction technique might have had various degrees of influence.

  2. Revision of failed hip resurfacing to total hip arthroplasty rapidly relieves pain and improves function in the early post operative period

    Directory of Open Access Journals (Sweden)

    Muirhead-Allwood Sarah K

    2010-11-01

    Full Text Available Abstract We reviewed the results of 25 consecutive patients who underwent revision of a hip resurfacing prosthesis to a total hip replacement. Revisions were performed for recurrent pain and effusion, infection and proximal femoral fractures. Both components were revised in 20 cases. There were 12 male and 13 female patients with average time to revision of 34.4 and 26.4 months respectively. The mean follow up period was 12.7 months (3 to 31. All patients reported relief of pain and excellent satisfaction scores. Two patients experienced stiffness up to three months post operatively. Pre operative Oxford, Harris and WOMAC hip scores were 39.1, 36.4 and 52.2 respectively. Mean post operative scores at last follow up were 17.4, 89.8 and 6.1 respectively (p

  3. Development of a Rapidly Deployed Department of Energy Emergency Response Element

    International Nuclear Information System (INIS)

    Riland, C.A.; Hopkins, R.C.; Tighe, R.J.

    1999-01-01

    The Federal Radiological Emergency Response Plan (FRERP) directs the Department of Energy (DOE) to maintain a viable, timely, and fully documented response option capable of supporting the responsible Lead Federal Agency in the event of a radiological emergency impacting any state or US territory (e.g., CONUS). In addition, the DOE maintains a response option to support radiological emergencies outside the continental US (OCONUS). While the OCUNUS mission is not governed by the FREP, this response is operationally similar to that assigned to the DOE by the FREP. The DOE is prepared to alert, activate, and deploy radiological response teams to augment the Radiological Assistance Program and/or local responders. The Radiological Monitoring and Assessment Center (RMAC) is a phased response that integrates with the Federal Radiological Monitoring and Assessment Center (FRMAC) in CONUS environments and represents a stand-alone DOE response for OCONUS environments. The FRMAC/RMAC Phase I was formally ''stood up'' as an operational element in April 1999. The FRMAC/RMAC Phase II proposed ''stand-up'' date is midyear 2000

  4. The revised program for measurements in intense operation mode according to AVV-IMIS

    International Nuclear Information System (INIS)

    Bieringer, J.; Wirth, E.; Buehling, A.; Mueller-Neumann, M.; Haase, G.; Heinrich, T.; Steinkopff, T.; Wiezorek, C.

    2007-01-01

    The monitoring program for measurements in intense operation mode has been revised recently by a working group at the Federal Ministry for Environment, Nature Conservation and Reactor Safety (BMU). The major issues of the revision are reported in this contribution. Measurements in intense operation must be appropriate for fast assessment of the radiological situation, for estimating the dose to the population and for decisions on countermeasures to minimize the dose. In order to meet these requirements the structure of the measurement program in intense operation mode was divided into three phases when different exposition paths are relevant: before and during dispersion of radioactive material, immediately after dispersion of radioactive material has ended and a late phase when contamination values have decreased in different environmental media. For each of these phases a special measurement program was defined that is tailored to achieve the above mentioned objectives. Minimum detectable activity concentrations were introduced similar to the measurement program in routine operation mode. They follow the intervention levels in the catalogue of countermeasures and maximum permitted values given by the European Union (EU) for food and animal feed. The minimum detectable activity concentrations were defined such that the detection of 1/10 of the intervention levels for countermeasures is ensured. (orig.)

  5. Conceptual design report for a remotely operated cask handling system. Revision 1

    International Nuclear Information System (INIS)

    Yount, J.A.; Berger, J.D.

    1984-09-01

    Recent advances in remote handling utilizing commercial robotics are conceptually applied to lowering operator cumulative radiation exposure and increasing throughput during cask handling operations in nuclear shipping and receiving facilities. Revision 1 incorporates functional criteria for facility equipment, equipment technical outline specifications, and interface control drawings to assist Architect Engineers in the application of remote handling to waste shipping and receiving facilities. The document has also been updated to show some of the equipment used in proof-of-principle testing during fiscal year 1984. 10 references, 50 figures, 1 table

  6. Knowledge and abilities catalog for nuclear power plant operators: Boiling water reactors, Revision 1

    International Nuclear Information System (INIS)

    1995-08-01

    The Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Boiling-Water Reactors (BWRs) (NUREG-1123, Revision 1) provides the basis for the development of content-valid licensing examinations for reactor operators (ROs) and senior reactor operators (SROs). The examinations developed using the BWR Catalog along with the Operator Licensing Examiner Standards (NUREG-1021) and the Examiner's Handbook for Developing Operator Licensing Written Examinations (NUREG/BR-0122), will cover the topics listed under Title 10, Code of Federal Regulations, Part 55 (10 CFR 55). The BWR Catalog contains approximately 7,000 knowledge and ability (K/A) statements for ROs and SROs at BWRs. The catalog is organized into six major sections: Organization of the Catalog, Generic Knowledge and Ability Statements, Plant Systems grouped by Safety Functions, Emergency and Abnormal Plant Evolutions, Components, and Theory. Revision 1 to the BWR Catalog represents a modification in form and content of the original catalog. The K/As were linked to their applicable 10 CFR 55 item numbers. SRO level K/As were identified by 10 CFR 55.43 item numbers. The plant-wide generic and system generic K/As were combined in one section with approximately one hundred new K/As. Component Cooling Water and Instrument Air Systems were added to the Systems Section. Finally, High Containment Hydrogen Concentration and Plant Fire On Site evolutions added to the Emergency and Abnormal Plant Evolutions section

  7. Federal Radiological Monitoring and Assessment Center: Phase I Response

    International Nuclear Information System (INIS)

    Riland, C.; Bowman, D.R.; Lambert, R.; Tighe, R.

    1999-01-01

    A Federal Radiological Monitoring and Assessment Center (FRMAC) is established in response to a Lead Federal Agency (LFA) or State request when a radiological emergency is anticipated or has occurred. The FRMAC coordinates the off-site monitoring, assessment, and analysis activities during such an emergency. The FRMAC response is divided into three phases. FRMAC Phase 1 is a rapid, initial-response capability that can interface with Federal or State officials and is designed for a quick response time and rapid radiological data collection and assessment. FRMAC Phase 1 products provide an initial characterization of the radiological situation and information on early health effects to officials responsible for making and implementing protective action decisions

  8. The Revised Guiding Principles and General Operating Rules to Govern the Provision of Technical Assistance by the Agency. Latest Status

    International Nuclear Information System (INIS)

    1979-03-01

    The Revised Guiding Principles and General Operating Rules to Govern the Provision of Technical Assistance by the Agency were approved by the Board of Governors on 21 February 1979. The test is reproduced herein for the information of all Members. The provisions established by the Board of Governors on 24 September 1977 for the application of safeguards in relation to the granting of technical assistance are also reproduced in the Annex to the Revised Guiding Principles and General Operating Rules.

  9. Changes in safety climate and teamwork in the operating room after implementation of a revised WHO checklist: a prospective interventional study.

    Science.gov (United States)

    Erestam, Sofia; Haglind, Eva; Bock, David; Andersson, Annette Erichsen; Angenete, Eva

    2017-01-01

    Inter-professional teamwork in the operating room is important for patient safety. The World Health Organization (WHO) checklist was introduced to improve intraoperative teamwork. The aim of this study was to evaluate the safety climate in a Swedish operating room setting before and after an intervention, using a revised version of the WHO checklist to improve teamwork. This study is a single center prospective interventional study. Participants were personnel working in operating room teams including surgeons, anesthesiologists, scrub nurses, nurse anaesthetists and nurse assistants. The study started with pre-interventional observations of the WHO checklist use followed by education on safety climate, the WHO checklist, and non-technical skills in the operating room. Thereafter a revised version of the WHO checklist was introduced. Post-interventional observations regarding the performance of the WHO checklist were carried out. The Safety Attitude Questionnaire was used to assess safety climate at baseline and post-intervention. At baseline we discovered a need for improved teamwork and communication. The participants considered teamwork to be important for patient safety, but had different perceptions of good teamwork between professions. The intervention, a revised version of the WHO checklist, did not affect teamwork climate. Adherence to the revision of the checklist was insufficient, dominated by a lack of structure. There was no significant change in teamwork climate by use of the revised WHO checklist, which may be due to insufficient implementation, as a lack of adherence to the WHO checklist was detected. We found deficiencies in teamwork and communication. Further studies exploring how to improve safety climate are needed. NCT02329691.

  10. Federal Radiological Monitoring and Assessment Center. The analytical response

    International Nuclear Information System (INIS)

    Nielsen, E.C.

    2005-01-01

    The Federal Radiological Monitoring and Assessment Center (FRMAC) is authorized by the Federal Radiological Emergency Response Plan to coordinate all off-site radiological response assistance to state and local governments, in the event of a major radiological emergency in the United States. The FRMAC is established by the U.S. Department of Energy, National Nuclear Security Administration, to coordinate all Federal assets involved in conducting a comprehensive program of radiological environmental monitoring, sampling, radioanalysis, quality assurance, and dose assessment. During an emergency response, the initial analytical data is provided by portable field instrumentation. As incident responders scale up their response based on the seriousness of the incident, local analytical assets and mobile laboratories add additional capability and capacity. During the intermediate phase of the response, data quality objectives and measurement quality objectives are more rigorous. These higher objectives will require the use of larger laboratories, with greater capacity and enhanced capabilities. These labs may be geographically distant from the incident, which will increase sample management challenges. Emergency radioanalytical capability and capacity and its utilization during FRMAC operations are discussed. (author)

  11. Application of the polystyrene model made by 3-D printing rapid prototyping technology for operation planning in revision lumbar discectomy.

    Science.gov (United States)

    Li, Chao; Yang, Mingyuan; Xie, Yang; Chen, Ziqiang; Wang, Chuanfeng; Bai, Yushu; Zhu, Xiaodong; Li, Ming

    2015-05-01

    The objective was to evaluate the effectiveness of 3-D rapid prototyping technology in revision lumbar discectomy. 3-D rapid prototyping technology has not been reported in the treatment of revision lumbar discectomy. Patients with recurrent lumbar disc herniation who were preparing to undergo revision lumbar discectomy from a single center between January 2011 and 2013 were included in this analysis. Patients were divided into two groups. In group A, 3-D printing technology was used to create subject-specific lumbar vertebral models in the preoperative planning process. Group B underwent lumbar revision as usual. Preoperative and postoperative clinical outcomes were compared between groups included operation time, perioperative blood loss, postoperative complications, Oswestry Disability Index (ODI), Japan Orthopaedics Association (JOA) scores, and visual analogue scale (VAS) scores for back pain and leg pain. A total of 37 patients were included in this study (Group A = 15, Group B = 22). Group A had a significantly shorter operation time (106.53 ± 11.91 vs. 131.92 ± 10.81 min, P < 0.001) and significantly less blood loss (341.67 ± 49.45 vs. 466.77 ± 71.46 ml, P < 0.001). There was no difference between groups for complication rate. There were also no differences between groups for any clinical metric. Using the 3-D printing technology before revision lumbar discectomy may reduce the operation time and the perioperative blood loss. There does not appear to be a benefit to using the technology with respect to clinical outcomes. Future prospective studies are needed to further elucidate the efficacy of this emerging technology.

  12. The Revised Guiding Principles and General Operating Rules to Govern the Provision of Technical Assistance by the Agency. Latest Status (Arabic Edition)

    International Nuclear Information System (INIS)

    1979-03-01

    The Revised Guiding Principles and General Operating Rules to Govern the Provision of Technical Assistance by the Agency were approved by the Board of Governors on 21 February 1979. The test is reproduced herein for the information of all Members. The provisions established by the Board of Governors on 24 September 1977 for the application of safeguards in relation to the granting of technical assistance are also reproduced in the Annex to the Revised Guiding Principles and General Operating Rules.

  13. The Revised Guiding Principles and General Operating Rules to Govern the Provision of Technical Assistance by the Agency. Latest Status (Chinese Edition)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1979-03-15

    The Revised Guiding Principles and General Operating Rules to Govern the Provision of Technical Assistance by the Agency were approved by the Board of Governors on 21 February 1979. The test is reproduced herein for the information of all Members. The provisions established by the Board of Governors on 24 September 1977 for the application of safeguards in relation to the granting of technical assistance are also reproduced in the Annex to the Revised Guiding Principles and General Operating Rules.

  14. The Revised Guiding Principles and General Operating Rules to Govern the Provision of Technical Assistance by the Agency. Latest Status (Spanish Edition)

    International Nuclear Information System (INIS)

    1979-03-01

    The Revised Guiding Principles and General Operating Rules to Govern the Provision of Technical Assistance by the Agency were approved by the Board of Governors on 21 February 1979. The test is reproduced herein for the information of all Members. The provisions established by the Board of Governors on 24 September 1977 for the application of safeguards in relation to the granting of technical assistance are also reproduced in the Annex to the Revised Guiding Principles and General Operating Rules. [es

  15. The Revised Guiding Principles and General Operating Rules to Govern the Provision of Technical Assistance by the Agency. Latest Status (Russian Edition)

    International Nuclear Information System (INIS)

    1979-03-01

    The Revised Guiding Principles and General Operating Rules to Govern the Provision of Technical Assistance by the Agency were approved by the Board of Governors on 21 February 1979. The test is reproduced herein for the information of all Members. The provisions established by the Board of Governors on 24 September 1977 for the application of safeguards in relation to the granting of technical assistance are also reproduced in the Annex to the Revised Guiding Principles and General Operating Rules. [ru

  16. The Revised Guiding Principles and General Operating Rules to Govern the Provision of Technical Assistance by the Agency. Latest Status (Chinese Edition)

    International Nuclear Information System (INIS)

    1979-03-01

    The Revised Guiding Principles and General Operating Rules to Govern the Provision of Technical Assistance by the Agency were approved by the Board of Governors on 21 February 1979. The test is reproduced herein for the information of all Members. The provisions established by the Board of Governors on 24 September 1977 for the application of safeguards in relation to the granting of technical assistance are also reproduced in the Annex to the Revised Guiding Principles and General Operating Rules.

  17. The Revised Guiding Principles and General Operating Rules to Govern the Provision of Technical Assistance by the Agency. Latest Status (French Edition)

    International Nuclear Information System (INIS)

    1979-03-01

    The Revised Guiding Principles and General Operating Rules to Govern the Provision of Technical Assistance by the Agency were approved by the Board of Governors on 21 February 1979. The test is reproduced herein for the information of all Members. The provisions established by the Board of Governors on 24 September 1977 for the application of safeguards in relation to the granting of technical assistance are also reproduced in the Annex to the Revised Guiding Principles and General Operating Rules. [fr

  18. The unsuspected prosthetic joint infection : incidence and consequences of positive intra-operative cultures in presumed aseptic knee and hip revisions.

    Science.gov (United States)

    Jacobs, A M E; Bénard, M; Meis, J F; van Hellemondt, G; Goosen, J H M

    2017-11-01

    Positive cultures are not uncommon in cases of revision total knee and hip arthroplasty (TKA and THA) for presumed aseptic causes. The purpose of this study was to assess the incidence of positive intra-operative cultures in presumed aseptic revision of TKA and THA, and to determine whether the presence of intra-operative positive cultures results in inferior survival in such cases. A retrospective cohort study was assembled with 679 patients undergoing revision knee (340 cases) or hip arthroplasty (339 cases) for presumed aseptic causes. For all patients three or more separate intra-operative cultures were obtained. Patients were diagnosed with a previously unsuspected prosthetic joint infection (PJI) if two or more cultures were positive with the same organism. Records were reviewed for demographic details, pre-operative laboratory results and culture results. The primary outcome measure was infection-free implant survival at two years. The incidence of unsuspected PJI was 27 out of 340 (7.9%) in TKA and 41 out of 339 (12.1%) in THA. Following revision TKA, the rate of infection-free implant survival in patients with an unsuspected PJI was 88% (95% confidence intervals (CI) 60 to 97) at two years compared with 98% (95% CI 94 to 99) in patients without PJI (p = 0.001). After THA, the rate of survival was similar in those with unsuspected PJI (92% (95% CI 73 to 98) at two years) and those without (94% (95% CI 89 to 97), p = 0.31). Following revision of TKA and THA for aseptic diagnoses, around 10% of cases were found to have positive cultures. In the knee, such cases had inferior infection-free survival at two years compared with those with negative cultures; there was no difference between the groups following THA. Cite this article: Bone Joint J 2017;99-B:1482-9. ©2017 The British Editorial Society of Bone & Joint Surgery.

  19. Lessons learned during the development and conduct of exercise Fermont

    International Nuclear Information System (INIS)

    Faulk, S.M.

    1995-04-01

    On September 22--23, 1993, the DOE, Richland Operations Office (RL) in Richland, Washington conducted a major field exercise named Fremont. This exercise tested the ability of the Site emergency organization and the State and local emergency organizations in both Washington and Oregon to take the appropriate actions to mitigate a major emergency and to protect the citizens of the region. The exercise involved initial emergency activities as well as intermediate and late phase actions including relocation and ingestion activities. A major element of the exercise was the participation of the Federal Radiological Monitoring and Assessment Center (FRMAC). This was the first major exercise that a DOE site requested a full FRMAC participation in a nonclassified environment

  20. Evaluation of the revised electrolytic reduction reactor from a remote operability aspect

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Hyo Jik; Yoon, K. H.; Kim, K. H. (and others)

    2008-01-15

    This report presents an evaluation of the remote operability of the revised electrolytic reduction (ER) reactor installed in the ACP at KAERI. All operations have to be implemented in a fully remote manner since the ACPF is a hotcell for handling highly radioactive materials such as spent nuclear fuels. In particular, the ER process is a key process of the Advanced spent fuel Conditioning Process (ACP) and it needs a lot of other auxiliary equipment to perform it. Also, since the ER equipment is too big and complicated, and contrarily the ACPF is not big enough, and one common rail is allotted for a bridge transported servo manipulator, an in-cell crane and a gate crane, a remote handling of the ER reactor is accompanied by a difficulty for a remote operation. For an easy understanding, short overview of the ER process, the remote handling equipment, the structural configuration of the ACPF and the detail drawings of the ER equipment are presented. Through 4 month-remote operational tests, detailed operational procedures are presented along with pictures. The remote handling equipment and tools required in each operation are addressed in detail. Also, the procedure to implement each remote operation, and a task difficulty are evaluated from a remote operability aspect. All the remote tasks are distinguished according to whether a remote operation can be performed or not. Finally, partial improvement or an idea to solve the suggested problems is presented. This report will assist in modifying or scaling up the ER reactor.

  1. Federal Radiological Monitoring and Assessment Center Analytical Response

    International Nuclear Information System (INIS)

    Nielsen, E.C.

    2003-01-01

    The Federal Radiological Monitoring and Assessment Center (FR-MAC) is authorized by the Federal Radiological Emergency Response Plan to coordinate all off-site radiological response assistance to state and local government s, in the event of a major radiological emergency in the United States. The FR-MAC is established by the U.S. Department of Energy, National Nuclear Security Administration, to coordinate all Federal assets involved in conducting a comprehensive program of radiological environmental monitoring, sampling, radioanalysis, quality assurance, and dose assessment. During an emergency response, the initial analytical data is provided by portable field instrumentation. As incident responders scale up their response based on the seriousness of the incident, local analytical assets and mobile laboratories add additional capability and capacity. During the intermediate phase of the response, data quality objectives and measurement quality objectives are more rigorous. These higher objectives will require the use of larger laboratories, with greater capacity and enhanced capabilities. These labs may be geographically distant FR-om the incident, which will increase sample management challenges. This paper addresses emergency radioanalytical capability and capacity and its utilization during FR-MAC operations

  2. 78 FR 20423 - Oil and Gas and Sulphur Operations in the Outer Continental Shelf-Revisions to Safety and...

    Science.gov (United States)

    2013-04-05

    ... Enforcement (BSEE); Interior. ACTION: Final rule. SUMMARY: This final rule will revise and add several new... 63610). That rule established a new Subpart S in 30 CFR part 250, requiring all OCS operators to have a... to developing and implementing stop work authority (SWA) and ultimate work authority (UWA), requiring...

  3. Analysis of intraoperative difficulties and management of operative complications in revision anterior exposure of the lumbar spine: a report of 25 consecutive cases.

    Science.gov (United States)

    Flouzat-Lachaniette, Charles-Henri; Delblond, William; Poignard, Alexandre; Allain, Jérôme

    2013-04-01

    After a first anterior approach to the lumbar spine, formation of adhesions of soft tissues to the spine increases the surgical difficulties and potential for iatrogenic injury during the revision exposure. The objective of this study was to identify the intraoperative difficulties and postoperative complications associated with revision anterior lumbar spine procedures in a single institution. This is a retrospective review of 25 consecutive anterior revision lumbar surgeries in 22 patients (7 men and 15 women) operated on between 1998 and 2011. Patients with trauma or malignancies were excluded. The mean age of the patients at the time of revision surgery was 56 years (range 20-80 years). The complications were analyzed depending on the operative level and the time between the index surgery and the revision. Six major complications (five intraoperatively and one postoperatively) occurred in five patients (20 %): three vein lacerations (12 %) and two ureteral injuries (8 %), despite the presence of a double-J ureteral stent. The three vein damages were repaired or ligated by a vascular surgeon. One of the two ureteral injuries led to a secondary nephrectomy after end-to-end anastomosis failure; the other necessitated secondary laparotomy for small bowel obstruction. Anterior revision of the lumbar spine is technically challenging and is associated with a high rate of vascular or urologic complications. Therefore, the potential complications of the procedure must be weighted against its benefits. When iterative anterior lumbar approach is mandatory, exposure should be performed by an access surgeon in specialized centers that have ready access to vascular and urologic surgeons.

  4. Final Approval of California Air Plan Revision; Antelope Valley Air Quality Management District; VOCs From Motor Vehicle Assembly Coating Operations

    Science.gov (United States)

    EPA is taking final action to approve a revision to the Antelope Valley Air Quality Management District (AVAQMD) portion of the California SIP concerning the emissions of volatile organic compounds (VOCs) from motor vehicle assembly coating operations.

  5. Three or more preoperative injections is the most significant risk factor for revision surgery after operative treatment of lateral epicondylitis: an analysis of 3863 patients.

    Science.gov (United States)

    Degen, Ryan M; Cancienne, Jourdan M; Camp, Christopher L; Altchek, David W; Dines, Joshua S; Werner, Brian C

    2017-04-01

    This study was conducted to identify the rate of failure of operative treatment of lateral epicondylitis, defined as progression to ipsilateral revision surgery, and associated patient-specific risk factors for failure. A national database was used to identify patients undergoing surgical treatment of lateral epicondylitis from 2005 to 2012. Patients undergoing concomitant procedures were excluded. Patients who then required subsequent ipsilateral extensor carpi radialis brevis débridement or release within 2 years were identified using similar methods. A multivariate binomial logistic regression analysis was used to evaluate patient-related risk factors for revision surgery. In addition, the number of preoperative injections (1, 2, or ≥3) in the ipsilateral elbow was identified and included in the regression analysis. Adjusted odds ratios (OR) and 95% confidence intervals were calculated for each risk factor. Of 3863 patients who underwent operative treatment of lateral epicondylitis, 58 (1.5%) required ipsilateral revision surgery. Risk factors for revision surgery included age lateral epicondylitis in the studied population is low (1.5%). Risk factors for revision surgery include younger age, male gender, morbid obesity, tobacco use, and inflammatory arthritis. The most significant risk factor for revision surgery is having ≥3 ipsilateral preoperative injections. Copyright © 2017 Journal of Shoulder and Elbow Surgery Board of Trustees. Published by Elsevier Inc. All rights reserved.

  6. Ventriculoperitoneal shunt complications needing shunt revision in children: A review of 5 years of experience with 48 revisions

    Directory of Open Access Journals (Sweden)

    Rajendra K Ghritlaharey

    2012-01-01

    Full Text Available Background: The aim of this study was to review the management of ventriculoperitoneal (VP shunt complications in children. Patients and Methods: During the last 5 years (January 1, 2006 to December 31, 2010, 236 VP shunt operations were performed in children under 12 years of age; of these, 40 (16.94% developed shunt complications and those who underwent VP shunt revisions were studied. Results: This prospective study included 40 (28 boys and 12 girls children and required 48 shunt revisions. Complications following VP shunts that required shunt revisions were peritoneal catheter/peritoneal end malfunction (18, shunt/shunt tract infections (7, extrusion of peritoneal catheter through anus (5, ventricular catheter malfunction (4, cerebrospinal fluid (CSF leak from abdominal wound (4, shunt system failure (2, ventricular end/shunt displacement (2, CSF pseudocysts peritoneal cavity (2, extrusion of peritoneal catheter from neck, chest, abdominal scar and through umbilicus, one each. Four-fifth of these shunt complications occurred within 6 months of previous surgery. Surgical procedures done during shunt revisions in order of frequency were revision of peritoneal part of shunt (27, 56.25%, revision of entire shunt system (6, 12.5%, extra ventricular drainage and delayed re-shunt (5, 10.41%, shunt removal and delayed re-shunt (5, 10.41%, opposite side shunting (2, 4.16%, cysts excision and revision of peritoneal catheter (2, 4.16% and revision of ventricular catheter (1, 2.08%. The mortalities following VP shunt operations were 44 (18.64% and following shunt revisions were 4 (10%. Conclusions: VP shunt done for hydrocephalus in children is not only prone for complications and need for revision surgery but also associated with considerable mortality.

  7. 75 FR 3639 - Revisions to Rules Authorizing the Operation of Low Power Auxiliary Stations in the 698-806 MHz...

    Science.gov (United States)

    2010-01-22

    .... 10-24; DA 10-92] Revisions to Rules Authorizing the Operation of Low Power Auxiliary Stations in the... Auxiliary Stations, Including Wireless Microphones, and the Digital Television Transition AGENCY: Federal... language that must be used in the consumer disclosure that is required by Section 15.216 of Appendix B in...

  8. Outcome, revision rate and indication for revision following resurfacing hemiarthroplasty for osteoarthritis of the shoulder

    DEFF Research Database (Denmark)

    Rasmussen, J V; Polk, A; Sorensen, A K

    2014-01-01

    In this study, we evaluated patient-reported outcomes, the rate of revision and the indications for revision following resurfacing hemiarthroplasty of the shoulder in patients with osteoarthritis. All patients with osteoarthritis who underwent primary resurfacing hemiarthroplasty and reported...... to the Danish Shoulder Arthroplasty Registry (DSR), between January 2006 and December 2010 were included. There were 772 patients (837 arthroplasties) in the study. The Western Ontario Osteoarthritis of the Shoulder (WOOS) index was used to evaluate patient-reported outcome 12 months (10 to 14) post......-operatively. The rates of revision were calculated from the revisions reported to the DSR up to December 2011 and by checking deaths with the Danish National Register of Persons. A complete questionnaire was returned by 688 patients (82.2%). The mean WOOS was 67 (0 to 100). A total of 63 hemiarthroplasties (7...

  9. Revised licensee event report system

    International Nuclear Information System (INIS)

    Mays, G.T.; Poore, W.P.

    1985-01-01

    Licensee Event Reports (LERs) provide the basis for evaluating and assessing operating experience information from nuclear power plants. The reporting requirements for submitting LERs to the Nuclear Regulatory Commission have been revised. Effective Jan. 1, 1984, all events were to be submitted in accordance with 10 CFR 50.73 of the Code of Federal Regulations. Report NUREG-1022, Licensee Event Report System-Description of System and Guidelines for Reporting, describes the guidelines on reportability of events. This article summarizes the reporting requirements as presented in NUREG-1022, high-lights differences in data reported between the revised and previous LER systems, and presents results from a preliminary assessment of LERs submitted under the revised LER reporting system

  10. The Epidemiology of Revision Anterior Cruciate Ligament Reconstruction in Adults from Ontario, Canada

    Science.gov (United States)

    Leroux, Timothy; Wasserstein, David; Dwyer, Tim; Ogilvie-Harris, Darrell; Marks, Paul H.; Bach, Bernard R.; Townley, John; Mahomed, Nizar; Chahal, Jaskarndip

    2015-01-01

    Objectives: The morbidity associated with revision anterior cruciate ligament reconstruction (ACLR) is largely unknown. The objective of this study was to determine the rate of and risk factors for re-revision, re-operation, and re-admission following revision ACLR in the general population. Methods: All patients who underwent first revision ACLR in Ontario, Canada from January 2004 to December 2010 were identified and followed to December 2012. Exclusions included age (<16 years), previous osteotomy, or multi-ligament knee reconstruction. The main outcome was re-revision ACLR. Secondary outcomes included re-operation [irrigation and debridement (I&D), meniscectomy, manipulation under anesthesia (MUA), contralateral ACLR, and total knee arthroplasty (TKA)], and re-admission within 90 days of surgery. Survival to re-revision was determined using the Kaplan-Meier (KM) approach. A Cox proportional hazards model or logistic regression were used to determine the influence of patient factors (age, sex, neighborhood income quintile, and comorbidity), surgical factors (graft choice, concurrent meniscal procedure, and fixation method), and provider factors (surgeon volume, surgeon years in practice, and hospital status) on outcomes. A post-hoc analysis was performed to determine the influence of the aforementioned factors on overall post-operative infection risk, including both operative and non-operative cases. Results: Overall, 827 patients were included (median age: 30 years; 58.8% males). Single stage revisions comprised 92.9% of cases, and a meniscal procedure (repair or debridement) was performed in 45.3% of cases. The re-revision rate at a mean follow-up of 4.8±2.2 years was 4.4%, and the five-year survival rate was 95.4% (Figure 1). The rates of I&D, meniscectomy, contralateral ACLR, and re-admission were 0.8%, 3.1%, 3.4%, and 4.1%, respectively. MUA and TKA were rare. Young age significantly increased contralateral ACLR risk (risk decreased by 5.1% with each year

  11. Operations program plan: Revision 3

    International Nuclear Information System (INIS)

    1988-07-01

    This document, the Operations Program Plan (OPP), has been developed as the seven-year master plan for operation of WIPP. The OPP was authorized by the Albuquerque Field Office of the Department of Energy (DOE-AL) and that organization's WIPP Project Office (DOE-WPO) in Carlsbad, New Mexico. The OPP is the directive from the DOE-WPO Project Manager as to how the WIPP is to be managed, operated, and administered. As the top tier management document for WIPP, the OPP establishes organizational responsibilities and an organizational structure for the Waste Isolation Division (WID) of Westinghouse Electric Corporation. The OPP sets policy and tone for conducting WIPP operations; it requires and specifically authorizes implementing documents (e.g., manuals). It has also proven instrumental in the budgeting and planning process, most particularly in expediting the preparation of specific budgets and detailed schedules for each of the numerous work packages. The OPP is also used to communicate information about WIPP operations

  12. NPP License Renewal and Aging Management: Revised Guidance

    International Nuclear Information System (INIS)

    Hull, A.B.; Hiser, A.L.; Lindo-Talin, S.E.

    2012-01-01

    Based on the Atomic Energy Act, the NRC issues licenses for commercial power reactors to operate for up to 40 years and allows these licenses to be renewed for up to another 20 years. NRC has approved license renewal for well over 50% of U.S. located reactors originally licensed to operate for 40 years. Of these 104 reactors (69 PWRs, 35 BWRs), the NRC has issued renewed licenses for 71 units and is currently reviewing applications for another 15 units. As of May 1, 2012, ten plants at nine sites had entered their 41st year of operation and thus are in their first period of extended operation (PEO). Five more plants will enter the PEO by the end of 2012. One foundation of the license renewal process has been license renewal guidance documents (LRGDs). The U.S. Nuclear Regulatory Commission (NRC) revised key guidance documents used for nuclear power license renewal in 2010 and 2011. These include NUREG-1800, 'Standard Review Plan for Review of License Renewal Applications,' revision 2 (SRP-LR), and NUREG-1801, 'Generic Aging Lessons Learned (GALL) Report,' revision 2 (GALL Report). The guidance documents were updated to reflect lessons learned and operating experience gained since the guidance documents were last issued in 2005. (author)

  13. Fast-track revision knee arthroplasty

    DEFF Research Database (Denmark)

    Husted, Henrik; Otte, Niels Kristian Stahl; Kristensen, Billy B

    2011-01-01

    Abstract Background and purpose Fast-track surgery has reduced the length of hospital stay (LOS), morbidity, and convalescence in primary hip and knee arthroplasty (TKA). We assessed whether patients undergoing revision TKA for non-septic indications might also benefit from fast-track surgery....... Methods 29 patients were operated with 30 revision arthroplasties. Median age was 67 (34-84) years. All patients followed a standardized fast-track set-up designed for primary TKA. We determined the outcome regarding LOS, morbidity, mortality, and satisfaction. Results Median LOS was 2 (1-4) days...

  14. EPRI BWR Water Chemistry Guidelines Revision

    International Nuclear Information System (INIS)

    Garcia, Susan E.; Giannelli, Joseph F.

    2014-01-01

    BWRVIP-190: BWR Water Chemistry Guidelines – 2008 Revision has been revised. The revision committee consisted of U.S. and non-U.S. utilities (members of the BWR Vessel and Internals Protection (BWRVIP) Mitigation Committee), reactor system manufacturers, fuel suppliers, and EPRI and industry experts. The revised document, BWRVIP-190 Revision 1, was completely reformatted into two volumes, with a simplified presentation of water chemistry control, diagnostic and good practice parameters in Volume 1 and the technical bases in Volume 2, to facilitate use. The revision was developed in parallel and in coordination with preparation of the Fuel Reliability Guidelines Revision 1: BWR Fuel Cladding Crud and Corrosion. Guidance is included for plants operating under normal water chemistry (NWC), moderate hydrogen water chemistry (HWC-M), and noble metal application (GE-Hitachi NobleChem™) plus hydrogen injection. Volume 1 includes significant changes to BWR feedwater and reactor water chemistry control parameters to provide increased assurance of intergranular stress corrosion cracking (IGSCC) mitigation of reactor materials and fuel reliability during all plant conditions, including cold shutdown (≤200°F (93°C)), startup/hot standby (>200°F (93°C) and ≤ 10%) and power operation (>10% power). Action Level values for chloride and sulfate have been tightened to minimize environmentally assisted cracking (EAC) of all wetted surfaces, including those not protected by hydrogen injection, with or without noble metals. Chemistry control guidance has been enhanced to minimize shutdown radiation fields by clarifying targets for depleted zinc oxide (DZO) injection while meeting requirements for fuel reliability. Improved tabular presentations of parameter values explicitly indicate levels at which actions are to be taken and required sampling frequencies. Volume 2 provides the technical bases for BWR water chemistry control for control of EAC, flow accelerated corrosion

  15. Evaluation and assessment methodology, standards, and procedures manual of the United States Federal Radiological Monitoring and Assessment Center

    International Nuclear Information System (INIS)

    Kerns, K.C.; Burson, Z.G.; Smith, J.M.; Blanchard, R.L.

    2000-01-01

    In the event of a major radiological emergency, the U.S. Federal Radiological Emergency Response Plan authorises the creation of the Federal Radiological Monitoring and Assessment Center (FRMAC). The FRMAC is established to co-ordinate the Federal off-site monitoring and assessment activities, and is comprised of representatives from several Federal agencies and Department of Energy contractors who provide assistance to the state(s) and Lead Federal Agency. The Evaluation and Assessment (E and A) Division of the FRMAC is responsible for receiving, storing, and interpreting environmental surveillance data to estimate the potential health consequences to the population in the vicinity of the accident site. The E and A Division has commissioned the preparation of a methodology and procedures manual which will result in a consistent approach by Division members in carrying out their duties. The first edition of this manual is nearing completion. In this paper, a brief review of the structure of the FRMAC is presented, with emphasis on the E and A Division. The contents of the E and A manual are briefly described, as are future plans for its expansion. (author)

  16. Revision of Krsko NPP Quality Assurance Plan

    International Nuclear Information System (INIS)

    Biscan, R.; Fifnja, I.; Kavsek, D.

    2012-01-01

    International standards from nuclear power plant operation area are being frequently upgraded and revised in accordance with the continuous improvement philosophy. This philosophy applies also to the area of Quality Assurance, which has also undergone significant improvement since the early 1950s. Besides just nuclear industry, there are also other international quality standards that are being continuously developed and revised, bringing needs for upgrades also in the nuclear application. Since the beginning of Krsko NPP construction, the overall Quality Assurance program and its applicable procedures were in place to assure that all planned and systematic actions necessary to provide adequate confidence that an item or service will satisfy given requirements to quality, are in place. The overall requirements for quality as one of the major objectives for Krsko NPP operation are also set forth in the Updated Safety Analyses Report, the document that serves as a base for operating license. During more than 30 years of Krsko NPP operation, the quality requirements and related documents were revised and upgraded in several attempts. The latest revision 6 of QD-1, Quality Assurance Plan was issued during the year 2011. The bases for the revision were: Changes of the Slovenian regulatory requirements (ZVISJV, JV5, JV9?), Changes of Krsko NPP licensing documents (USAR section 13?), SNSA inspection requirements, Changes of international standards (IAEA, ISO?), Conclusions of first PSR, Implementation of ISO standards in Krsko NPP (ISO14001, ISO17025), Changes of plant procedures, etc. One of the most obvious changes was the enlargement of the QA Plan scope to cover interdisciplinary areas defined in the plant management program MD-1, such as Safety culture, Self-assessment, Human performance, Industrial Safety etc. The attachment of the QA Plan defining relationships between certain standards was also updated to provide matrix for better correlation of requirements of

  17. Analysis of failed rotator cuff repair – Retrospective survey of revisions after open rotator cuff repair

    Directory of Open Access Journals (Sweden)

    Rupert Schupfner

    2017-07-01

    Full Text Available Background Rotator cuff defects are frequently occurring shoulder pathologies associated with pain and movement impairment. Aims The aim of the study was to analyse the pathologies that lead to operative revisions after primary open rotator cuff repair. Methods In 216 patients who underwent primary rotator cuff repair and later required operative revision between 1996 to 2005, pathologies found intraoperatively during the primary operation and during revision surgery were collected, analysed and compared. Results The average age at the time of revision surgery was 54.3 years. The right shoulder (61.6 per cent was more often affected than the left, males (63.4 per cent more often than females. At primary operation – apart from rotator cuff repair – there were the following surgical procedures performed: 190 acromioplasty, 86 Acromiclavicular joint resections, 68 tenodesis, 40 adhesiolysis and 1 tenotomy. If an ACJ-resection had been performed in the primary operation, ACJ-problems were rare in revision surgery (p<0.01. Primary gleno-humeral adhesions were associated with a significant rise in re-tearing rate (p=0.049. Primary absence of adhesions went along with a significant lower rate of adhesions found at revision (p=0.018. Primary performed acromioplasty had no influence on re-tearing rate (p=0.408 or on the rate of subacromial impingement at revision surgery (p=0.709. Conclusion To avoid operative revision after rotator cuff repair relevant copathologies of the shoulder have to be identified before or during operation and treated accordingly. Therefore, even during open rotator cuff repair, the surgeon should initially start with arthroscopy of the shoulder joint and subacromial space to recognise co-pathologies.

  18. [APPLICATION OF COMPUTER-ASSISTED TECHNOLOGY IN ANALYSIS OF REVISION REASON OF UNICOMPARTMENTAL KNEE ARTHROPLASTY].

    Science.gov (United States)

    Jia, Di; Li, Yanlin; Wang, Guoliang; Gao, Huanyu; Yu, Yang

    2016-01-01

    To conclude the revision reason of unicompartmental knee arthroplasty (UKA) using computer-assisted technology so as to provide reference for reducing the revision incidence and improving the level of surgical technique and rehabilitation. The relevant literature on analyzing revision reason of UKA using computer-assisted technology in recent years was extensively reviewed. The revision reasons by computer-assisted technology are fracture of the medial tibial plateau, progressive osteoarthritis of reserved compartment, dislocation of mobile bearing, prosthesis loosening, polyethylene wear, and unexplained persistent pain. Computer-assisted technology can be used to analyze the revision reason of UKA and guide the best operating method and rehabilitation scheme by simulating the operative process and knee joint activities.

  19. NPP License Renewal and Aging Management: Revised Guidance

    International Nuclear Information System (INIS)

    Hull, A.B.; Hiser, A.L.; Lindo-Talin, S.E.

    2012-01-01

    Based on the Atomic Energy Act, the NRC issues licenses for commercial power reactors to operate for up to 40 years and allows these licenses to be renewed for up to another 20 years. NRC has approved license renewal (LR) for well over 50% of U.S. located reactors originally licensed to operate for 40 years. Of these 104 reactors (69 PWRs, 35 BWRs), the NRC has issued renewed licenses for 71 units and is currently reviewing applications for another 15 units. As of May 1, 2012, ten plants at nine sites had entered their 41st year of operation and thus are in their first period of extended operation (PEO). Five more plants will enter the PEO by the end of 2012. One foundation of the license renewal process has been license renewal guidance documents (LRGDs). The U.S. Nuclear Regulatory Commission (NRC) revised key guidance documents used for nuclear power LR in 2010 and 2011. These include NUREG-1800, 'Standard Review Plan for Review of License Renewal Applications,' revision 2 (SRP-LR), and NUREG-1801, 'Generic Aging Lessons Learned (GALL) Report,' revision 2 (GALL Report). The guidance documents were updated to reflect lessons learned and operating experience gained since the guidance documents were last issued in 2005. The reactor LRGDs referenced in this poster can all be accessed at http://www.nrc.gov/reactors/operating/licensing/renewal/guidance.html (author)

  20. Revised Paris and Vienna Nuclear Liability Conventions - Challenges for Nuclear Insurers

    International Nuclear Information System (INIS)

    Tetley, M.

    2006-01-01

    The revisions recently implemented to both the Vienna and Paris nuclear liability Conventions are intended to widen significantly the amount and scope of compensation payable in the event of a nuclear accident. Whilst this is a laudable objective, the final extent of the revisions leaves nuclear site operators and their insurers with greater uncertainty as a result of the wider and unquantifiable nature of some aspects of the revised nuclear damage definition, in particular where reference is made to environmental reinstatement and extended prescription periods. Incorporating broader definitions in the Convention revisions will therefore leave gaps in the insurance cover where insurers are unable to insure the new, wider scope of cover. If no insurance is available, then the liability for the revised scope of cover must fall upon either the operator or the national Government. This presentation will give an overview of where and why the major gaps in nuclear liability insurance cover will occur in the revised Conventions; it will also examine the problems in defining the revised scope of cover and will look at where these unquantifiable risks should now reside, to ensure there is equity between the liabilities imposed on the nuclear industry and those imposed on other industrial sectors. (author)

  1. Risk factors for total hip arthroplasty aseptic revision.

    Science.gov (United States)

    Khatod, Monti; Cafri, Guy; Namba, Robert S; Inacio, Maria C S; Paxton, Elizabeth W

    2014-07-01

    The purpose of this study was to evaluate patient, operative, implant, surgeon, and hospital factors associated with aseptic revision after primary THA in patients registered in a large US Total Joint Replacement Registry. A total of 35,960 THAs registered from 4/2001-12/2010 were evaluated. The 8-year survival rate was 96.7% (95% CI 96.4%-97.0%). Females had a higher risk of aseptic revision than males. Hispanic and Asian patients had a lower risk of revision than white patients. Ceramic-on-ceramic, ceramic-on-conventional polyethylene, and metal-on-conventional polyethylene bearing surfaces had a higher risk of revision than metal-on-highly cross-linked polyethylene. Body mass index, health status, diabetes, diagnosis, fixation, approach, bilateral procedures, head size, surgeon fellowship training, surgeon and hospital volume were not revision risk factors. Copyright © 2014 Elsevier Inc. All rights reserved.

  2. Rhinoplasty for the multiply revised nose.

    Science.gov (United States)

    Foda, Hossam M T

    2005-01-01

    To evaluate the problems encountered on revising a multiply operated nose and the methods used in correcting such problems. The study included 50 cases presenting for revision rhinoplasty after having had 2 or more previous rhinoplasties. An external rhinoplasty approach was used in all cases. Simultaneous septal surgery was done whenever indicated. All cases were followed for a mean period of 32 months (range, 1.5-8 years). Evaluation of the surgical result depended on clinical examination, comparison of pre- and postoperative photographs, and degree of patients' satisfaction with their aesthetic and functional outcome. Functionally, 68% suffered nasal obstruction that was mainly caused by septal deviations and nasal valve problems. Aesthetically, the most common deformities of the upper two thirds of the nose included pollybeak (64%), dorsal irregularities (54%), dorsal saddle (44%), and open roof deformity (42%), whereas the deformities of lower third included depressed tip (68%), tip contour irregularities (60%), and overrotated tip (42%). Nasal grafting was necessary in all cases; usually more than 1 type of graft was used in each case. Postoperatively, 79% of the patients, with preoperative nasal obstruction, reported improved breathing; 84% were satisfied with their aesthetic result; and only 8 cases (16%) requested further revision to correct minor deformities. Revision of a multiply operated nose is a complex and technically demanding task, yet, in a good percentage of cases, aesthetic as well as functional improvement are still possible.

  3. 75 FR 36126 - Office of New Reactors; Proposed Revision to Standard Review Plan Section 13.6.1, Revision 1 on...

    Science.gov (United States)

    2010-06-24

    ... Standard Review Plan Section 13.6.1, Revision 1 on Physical Security--Combined License and Operating...), Section 13.6.1 on ``Physical Security--Combined License and Operating Reactors,'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML100350158). The Office of Nuclear Security and...

  4. Closed cooling water chemistry guidelines revision

    International Nuclear Information System (INIS)

    McElrath, Joel; Breckenridge, Richard

    2014-01-01

    This second revision of the Closed Cooling Water Chemistry Guideline addresses the use of chemicals and monitoring methods to mitigate corrosion, fouling, and microbiological growth in the closed cooling-water (CCW) systems of nuclear and fossil-fueled power plants. This revision has been endorsed by the utility chemistry community and represents another step in developing a more proactive chemistry program to limit or control closed cooling system degradation with increased consideration of corporate resources and plant-specific design and operating concerns. These guidelines were developed using laboratory data, operating experience, and input from organizations and utilities within and outside of the United States of America. It is the intent of the Revision Committee that these guidelines are applicable to all nuclear and fossil-fueled generating stations around the world. A committee of industry experts—including utility specialists, Institute of Nuclear Power Operations representatives, water-treatment service-company representatives, consultants, a primary contractor, and EPRI staff—collaborated in reviewing available data on closed cooling-water system corrosion and microbiological issues. Recognizing that each plant owner has a unique set of design, operating, and corporate concerns, the Guidelines Committee developed a methodology for plant-specific optimization. The guideline provides the technical basis for a reasonable but conservative set of chemical treatment and monitoring programs. The use of operating ranges for the various treatment chemicals discussed in this guideline will allow a power plant to limit corrosion, fouling, and microbiological growth in CCW systems to acceptable levels. The guideline now includes closed cooling chemistry regimes proven successful in use in the international community. The guideline provides chemistry constraints for the use of phosphates control, as well as pure water with pH control. (author)

  5. Descriptor revision belief change through direct choice

    CERN Document Server

    Hansson, Sven Ove

    2017-01-01

    This book provides a critical examination of how the choice of what to believe is represented in the standard model of belief change. In particular the use of possible worlds and infinite remainders as objects of choice is critically examined. Descriptors are introduced as a versatile tool for expressing the success conditions of belief change, addressing both local and global descriptor revision. The book presents dynamic descriptors such as Ramsey descriptors that convey how an agent’s beliefs tend to be changed in response to different inputs. It also explores sentential revision and demonstrates how local and global operations of revision by a sentence can be derived as a special case of descriptor revision. Lastly, the book examines revocation, a generalization of contraction in which a specified sentence is removed in a process that may possibly also involve the addition of some new information to the belief set.

  6. 23 CFR 636.409 - Can offerors revise their proposals during communications?

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Can offerors revise their proposals during communications? 636.409 Section 636.409 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING Exchanges § 636.409 Can offerors revise their...

  7. Microbiological diagnosis in revision of infected knee arthroplasties in Denmark

    DEFF Research Database (Denmark)

    Lindberg-Larsen, Martin; Pitter, Frederik Taylor; Voldstedlund, Marianne

    2017-01-01

    . METHODS: One hundred and two partial revisions (open debridement and exchange of tibial insert) and 213 two-stage procedures performed due to infection in 275 patients from 1 July 2011 to 30 June 2013 were included and analysed by linkage to data from a nationwide registry on microbiological test results....... RESULTS: 78 (24.8%) revisions were culture negative, 192 (60.9%) showed monomicrobial growth and 43 (14.3%) polymicrobial growth. Staphylococcus aureus was the most frequent isolate in mono-culture in 70 (22.2%) revisions and in polymicrobial culture in 15 revisions with a total frequency of 27.0%. Only...... one case (1.4%) of methicillin-resistance was registered. Coagulase-negative staphylococci (CoNS) were frequent, sole pathogen in 65 revisions and in polymicrobial cultures in 28 revisions with a total frequency of 29.5%. A pre-operative knee aspiration was performed in 50% and preoperative blood...

  8. New and revised standards for coke production

    Energy Technology Data Exchange (ETDEWEB)

    G.A. Kotsyuba; M.I. Alpatov; Y.G. Shapoval [Giprokoks, the State Institute for the Design of Coke-Industry Enterprises, Kharkov (Ukraine)

    2009-07-15

    The need for new and revised standards for coke production in Ukraine and Russia is outlined. Such standards should address improvements in plant operation, working conditions, environmental protection, energy conservation, fire and explosion safety, and economic indices.

  9. EPRI PWR primary water chemistry guidelines revision

    International Nuclear Information System (INIS)

    McElrath, Joel; Fruzzetti, Keith

    2014-01-01

    EPRI periodically updates the PWR Primary Water Chemistry Guidelines as new information becomes available and as required by NEI 97-06 (Steam Generator Program Guidelines) and NEI 03-08 (Guideline for the Management of Materials Issues). The last revision of the PWR water chemistry guidelines identified an optimum primary water chemistry program based on then-current understanding of research and field information. This new revision provides further details with regard to primary water stress corrosion cracking (PWSCC), fuel integrity, and shutdown dose rates. A committee of industry experts, including utility specialists, nuclear steam supply system (NSSS) and fuel vendor representatives, Institute of Nuclear Power Operations (INPO) representatives, consultants, and EPRI staff collaborated in reviewing the available data on primary water chemistry, reactor water coolant system materials issues, fuel integrity and performance issues, and radiation dose rate issues. From the data, the committee updated the water chemistry guidelines that all PWR nuclear plants should adopt. The committee revised guidance with regard to optimization to reflect industry experience gained since the publication of Revision 6. Among the changes, the technical information regarding the impact of zinc injection on PWSCC initiation and dose rate reduction has been updated to reflect the current level of knowledge within the industry. Similarly, industry experience with elevated lithium concentrations with regard to fuel performance and radiation dose rates has been updated to reflect data collected to date. Recognizing that each nuclear plant owner has a unique set of design, operating, and corporate concerns, the guidelines committee has retained a method for plant-specific optimization. Revision 7 of the Pressurized Water Reactor Primary Water Chemistry Guidelines provides guidance for PWR primary systems of all manufacture and design. The guidelines continue to emphasize plant

  10. Single-stage revision for fungal peri-prosthetic joint infection: a single-centre experience.

    Science.gov (United States)

    Klatte, T O; Kendoff, D; Kamath, A F; Jonen, V; Rueger, J M; Frommelt, L; Gebauer, M; Gehrke, T

    2014-04-01

    Fungal peri-prosthetic infections of the knee and hip are rare but likely to result in devastating complications. In this study we evaluated the results of their management using a single-stage exchange technique. Between 2001 and 2011, 14 patients (ten hips, four knees) were treated for a peri-prosthetic fungal infection. One patient was excluded because revision surgery was not possible owing to a large acetabular defect. One patient developed a further infection two months post-operatively and was excluded from the analysis. Two patients died of unrelated causes. After a mean of seven years (3 to 11) a total of ten patients were available for follow-up. One patient, undergoing revision replacement of the hip, had a post-operative dislocation. Another patient, undergoing revision replacement of the knee, developed a wound infection and required revision 29 months post-operatively following a peri-prosthetic femoral fracture. The mean Harris hip score increased to 74 points (63 to 84; p prosthetic infection is feasible, with an acceptable rate of a satisfactory outcome.

  11. Revising Translations

    DEFF Research Database (Denmark)

    Rasmussen, Kirsten Wølch; Schjoldager, Anne

    2011-01-01

    The paper explains the theoretical background and findings of an empirical study of revision policies, using Denmark as a case in point. After an overview of important definitions, types and parameters, the paper explains the methods and data gathered from a questionnaire survey and an interview...... survey. Results clearly show that most translation companies regard both unilingual and comparative revisions as essential components of professional quality assurance. Data indicate that revision is rarely fully comparative, as the preferred procedure seems to be a unilingual revision followed by a more...... or less comparative rereading. Though questionnaire data seem to indicate that translation companies use linguistic correctness and presentation as the only revision parameters, interview data reveal that textual and communicative aspects are also considered. Generally speaking, revision is not carried...

  12. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1983-10-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience

  13. History of aerial surveys in response to radiological incidents and accidents

    International Nuclear Information System (INIS)

    Jobst, J.E.

    1986-01-01

    EG and G Energy Measurements Inc., operates the Remote Sensing Laboratory for the US Department of Energy (DOE). The Laboratory plays a key role in the federal response to a radiological incident or accident. It assists the DOE in the establishment of a Federal Radiological Monitoring and Assessment Center (FRMAC). The Remote Sensing Laboratory has played a major role in more than 13 incidents, including lost sources, accidental dispersions, and nuclear reactor incidents

  14. W-087 Operational test report. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Joshi, A.W.

    1997-06-10

    This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks. The equipment to be tested includes the following: a. Leak detection system operation and controls. b. Electrical interlocks.- C. Transfer pump oper ation. d. Vacuum breaker system interlocks.

  15. 78 FR 59982 - Revisions to Radiation Protection

    Science.gov (United States)

    2013-09-30

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0268] Revisions to Radiation Protection AGENCY: Nuclear..., ``Radiation Sources,'' Section 12.3 -12.4, ``Radiation Protection Design Features,'' and Section 12.5, ``Operational Radiation Protection Program.'' DATES: The effective date of this Standard Review Plan update is...

  16. Revision total hip arthoplasty: factors associated with re-revision surgery.

    Science.gov (United States)

    Khatod, Monti; Cafri, Guy; Inacio, Maria C S; Schepps, Alan L; Paxton, Elizabeth W; Bini, Stefano A

    2015-03-04

    The survivorship of implants after revision total hip arthroplasty and risk factors associated with re-revision are not well defined. We evaluated the re-revision rate with use of the institutional total joint replacement registry. The purpose of this study was to determine patient, implant, and surgeon factors associated with re-revision total hip arthroplasty. A retrospective cohort study was conducted. The total joint replacement registry was used to identify patients who had undergone revision total hip arthroplasty for aseptic reasons from April 1, 2001, to December 31, 2010. The end point of interest was re-revision total hip arthroplasty. Risk factors evaluated for re-revision total hip arthroplasty included: patient risk factors (age, sex, body mass index, race, and general health status), implant risk factors (fixation type, bearing surface, femoral head size, and component replacement), and surgeon risk factors (volume and experience). A multivariable Cox proportional hazards model was used. Six hundred and twenty-nine revision total hip arthroplasties with sixty-three (10%) re-revisions were evaluated. The mean cohort age (and standard deviation) was 57.0 ± 12.4 years, the mean body mass index (and standard deviation) was 29.5 ± 6.1 kg/m(2), and most of the patients were women (64.5%) and white (81.9%) and had an American Society of Anesthesiologists score of associated with the risk of re-revision. For every ten-year increase in patient age, the hazard ratio for re-revision decreases by a factor of 0.72 (95% confidence interval, 0.58 to 0.90). For every five revision surgical procedures performed by a surgeon, the risk of revision decreases by a factor of 0.93 (95% confidence interval, 0.86 to 0.99). At the time of revision, a new or retained cemented femoral implant or all-cemented hip implant increases the risk of revision by a factor of 3.19 (95% confidence interval, 1.22 to 8.38) relative to a retained or new uncemented hip implant. A ceramic on a

  17. Maximum surgical blood ordering schedules for revision lower limb arthroplasty.

    Science.gov (United States)

    Mahadevan, Devendra; Challand, Christopher; Clarke, Andrew; Keenan, Jonathan

    2011-05-01

    Effective utilisation of blood products is fundamental. The introduction of maximum surgical blood ordering schedules (MSBOS) for operations has been shown to improve transfusion services. A retrospective analysis was undertaken to establish an evidence-based MSBOS for revision total hip replacement (THR) and total knee revision (TKR). The impact of this schedule on blood conservation was analysed. A retrospective analysis was undertaken on 397 patients who underwent revision THR and TKR over a 4-year period. The cross-match-to-transfusion ratio (CTR) and transfusion index (TI) were calculated. A MSBOS protocol was created based on the TIs and its' impact on transfusion services was assessed prospectively on 125 patients by comparing CTRs. In revision THR, TI was 1.19 for elective cases, 1.55 for emergency cases and 2.35 for infected cases. There was no difference in TI for revisions of cemented and uncemented components. Single component THR revision required less transfusion. In revision TKR, TI was 0.31 for elective cases, 2.0 for emergency cases and 1.23 for cases with infection. The introduction of the MSBOS protocol had resulted in a considerable improvement in blood ordering. Reductions in the CTR were seen for all types of revision surgery, but most evident in elective revision THR (3.24-2.18) and elective revision TKR (7.95-1.2). Analysis confirmed that excessive cross-matching occurred for revision lower limb arthroplasty. The introduction of our MSBOS protocol promoted blood conservation and compliance with established national guidelines.

  18. Revision of the recommended international general standard for irradiated foods and of the recommended international code of practice for the operation of radiation facilities used for the treatment of foods

    International Nuclear Information System (INIS)

    1981-11-01

    In view of the findings and statements of the Joint FAO/IAEA/WHO Expert Committee on the Wholesomeness of Irradiated Food, convened in Geneva from 27 October to 3 November 1980, a Consultation Group, convened in Geneva from 1 to 3 July 1981 suggested the revision of the Recommended International General Standard for Irradiated Foods and of the Recommended International Code of Practice for the Operation of Radiation Facilities. The proposed changes are given and justified and the revised wording of the documents presented

  19. Operational waste volume projection. Revision 20

    International Nuclear Information System (INIS)

    Koreski, G.M.; Strode, J.N.

    1994-01-01

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of July 1994

  20. 77 FR 23244 - Atmos Energy Colorado/Kansas Division; Notice of Revised Baseline Filing

    Science.gov (United States)

    2012-04-18

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR12-22-000] Atmos Energy Colorado/Kansas Division; Notice of Revised Baseline Filing Take notice that on April 10, 2012, Atmos Energy Colorado/Kansas Division (Atmos) filed a revised baseline filing of their Statement of Operating...

  1. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1994-06-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes. Revision 7 was published in January 1993 and became effective in August 1993. Supplement 1 is being issued primarily to implement administrative changes to the requalification examination program resulting from the amendment to 10 CFR 55 that eliminated the requirement for every licensed operator to pass an NRC-conducted requalification examination as a condition for license renewal. The supplement does not substantially alter either the initial or requalification examination processes and will become effective 30 days after its publication is noticed in the Federal Register. The corporate notification letters issued after the effective date will provide facility licensees with at least 90 days notice that the examinations will be administered in accordance with the revised procedures

  2. The nuclear liability conventions revised

    International Nuclear Information System (INIS)

    Reyners, P.

    2004-01-01

    The signature on 12 February 2004 of the Protocols amending respectively the 1960 Paris Convention and the 1963 Brussels Supplementary Convention was the second step of the process of modernisation of the international nuclear liability regime after the adoption in September 1997 of a Protocol revising the 1963 Vienna Convention and of a new Convention on Supplementary Compensation for Nuclear Damage. The common objective of the new instruments is to provide more funds to compensate a larger number of potential victims in respect of a broader range of damage. Another goal of the revision exercise was to maintain the compatibility between the Paris and Vienna based systems, a commitment enshrined in the 1988 Joint Protocol, as well as to ascertain that Paris/Brussels countries could also become a Party to the Convention on Supplementary Compensation. However, while generally consistent vis a vis the Joint Protocol, the provisions of the Paris and Vienna Conventions, as revised, differ on some significant aspects. Another remaining issue is whether the improved international nuclear liability regime will succeed in attracting in the future a larger number of countries, particularly outside Europe, and will so become truly universal. Therefore, the need for international co-operation to address these issues, to facilitate the adoption of new implementing legislation and to ensure that this special regime keeps abreast of economic and technological developments, is in no way diminished after the revision of the Conventions.(author)

  3. PWR secondary water chemistry guidelines: Revision 3

    International Nuclear Information System (INIS)

    Lurie, S.; Bucci, G.; Johnson, L.; King, M.; Lamanna, L.; Morgan, E.; Bates, J.; Burns, R.; Eaker, R.; Ward, G.; Linnenbom, V.; Millet, P.; Paine, J.P.; Wood, C.J.; Gatten, T.; Meatheany, D.; Seager, J.; Thompson, R.; Brobst, G.; Connor, W.; Lewis, G.; Shirmer, R.; Gillen, J.; Kerns, M.; Jones, V.; Lappegaard, S.; Sawochka, S.; Smith, F.; Spires, D.; Pagan, S.; Gardner, J.; Polidoroff, T.; Lambert, S.; Dahl, B.; Hundley, F.; Miller, B.; Andersson, P.; Briden, D.; Fellers, B.; Harvey, S.; Polchow, J.; Rootham, M.; Fredrichs, T.; Flint, W.

    1993-05-01

    An effective, state-of-the art secondary water chemistry control program is essential to maximize the availability and operating life of major PWR components. Furthermore, the costs related to maintaining secondary water chemistry will likely be less than the repair or replacement of steam generators or large turbine rotors, with resulting outages taken into account. The revised PWR secondary water chemistry guidelines in this report represent the latest field and laboratory data on steam generator corrosion phenomena. This document supersedes Interim PWR Secondary Water Chemistry Recommendations for IGA/SCC Control (EPRI report TR-101230) as well as PWR Secondary Water Chemistry Guidelines--Revision 2 (NP-6239)

  4. Revision Total Hip Arthoplasty: Factors Associated with Re-Revision Surgery

    OpenAIRE

    Khatod, M; Cafri, G; Inacio, MCS; Schepps, AL; Paxton, EW; Bini, SA

    2015-01-01

    The survivorship of implants after revision total hip arthroplasty and risk factors associated with re-revision are not well defined. We evaluated the re-revision rate with use of the institutional total joint replacement registry. The purpose of this study was to determine patient, implant, and surgeon factors associated with re-revision total hip arthroplasty.A retrospective cohort study was conducted. The total joint replacement registry was used to identify patients who had undergone revi...

  5. Bulletin 2005-12 : revised Alberta pipeline regulation issued

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-05-31

    A revised Pipeline Regulation has been issued and is currently available on the Alberta Energy and Utilities Board (EUB) website. Changes to the regulation reflect bothchanges in EUB regulatory policy and processes and technological improvements. Goals of the revision include improvements in overall pipeline performance, and the implementation of recommendations derived from the Public Safety and Sour Gas Committee concerning sour gas pipeline safety. The regulation was re-organized for greater clarity, and structured into 11 parts. Issues concerning the transition to the revised regulation were presented. The summary of notable administrative changes included clarifications of when a pipeline application is not required; when ABSA approval is required for steam lines; situations for which low-pressure natural gas lines must be licensed; and emergency response requirements. Technical clarifications include requirements for pipeline operations and maintenance manuals; composite materials; limitations on amounts of H{sub 2}S in polymeric pipe; pressure mismatches; approval for testing with gaseous media; venting of small volumes of raw gas; right-of-way surveillance; inspection of surface construction activities; annual corrosion evaluations; registering of pipelines and excavators in controlled areas with Alberta One-Call; ground disturbance training; restoration and signage maintenance on abandoned pipelines; sour service steel pipelines; unused pipelines and abandoned pipelines; and remediation of stub ends in operating pipelines.

  6. Pain and Function Following Revision Cubital Tunnel Surgery.

    Science.gov (United States)

    Davidge, Kristen M; Ebersole, Gregory C; Mackinnon, Susan E

    2017-11-01

    The purpose of this study was to determine pain and functional outcomes following revision cubital tunnel surgery and to identify predictors of poor postoperative outcome. A retrospective cohort study was conducted of all patients undergoing revision cubital tunnel surgery over a 5-year period at a high-volume peripheral nerve center. Intraoperative findings, demographic and injury factors, and outcomes were reviewed. Average pain, worst pain, and impact of pain on self-perceived quality of life were each measured using a 10-cm visual analog scale (VAS). Function was evaluated using pinch and grip strength, as well as the Disabilities of the Arm, Shoulder and Hand (DASH) questionnaire. Differences in preoperative and postoperative pain, strength, and DASH were analyzed using nonparametric tests. Predictors of postoperative average pain were evaluated using odds ratios and linear regression analyses. The final cohort consisted of 50 patients (mean age: 46.3 ± 12.5 years; 29 [68%] male) undergoing 52 revision ulnar nerve transpositions (UNTs). Pain VAS scores decreased significantly following revision UNT. Strength and DASH scores demonstrated nonsignificant improvements postoperatively. Worse preoperative pain and greater than 1 prior cubital tunnel procedure were significant predictors of worse postoperative average pain VAS scores. Patients can and do improve following revision cubital tunnel surgery, particularly as it relates to pain. Intraoperative findings during the revision procedure suggest that adherence to specific principles in the primary operation is key to prevention of secondary cubital tunnel syndrome.

  7. Concerning partial revision of regulations on installation, operation, etc., of nuclear reactor, etc., for test and research

    International Nuclear Information System (INIS)

    1989-01-01

    To enforce the rules relating to nuclear material protection at nuclear power facilities as covered by the Nuclear Reactor Control Law, which was revised in May last year, orders should be issued by the Prime Minister's Office (or Ministry of International Trade and Industry) to specify the following matters: (1) measures to be carried out by the operators of nuclear facilities to ensure the protection of specially designated nuclear fuel materials, (2) procedures for the application for permission as covered by nuclear material protection rules, and (3) requirements for managers in charge of nuclear material protection. The new regulations should cover the following: (1) rules relating to the business of refining of nuclear fuels, and raw materials for nuclear substances, (2) rules relating to the business of processing of nuclear fuels, (3) rules relating to the installation, operation, etc., of nuclear reactor, etc., for test and research, (4) rules relating to the business of reprocessing of spent fules, (5) rules relating to the business of management of nuclear fuels or waste contaminated with nuclear fuels, and (6) rules relating to the application of nuclear fuels. (N.K)

  8. Single-stage Acetabular Revision During Two-stage THA Revision for Infection is Effective in Selected Patients.

    Science.gov (United States)

    Fink, Bernd; Schlumberger, Michael; Oremek, Damian

    2017-08-01

    patients were assessed before surgery, between stages, every 3 months during the first year after surgery, every 6 months during the second year postoperative, and at latest followup, and were retrospectively drawn from a longitudinally maintained institutional database. Thirty-four of 35 patients (97.2%; 95% CI, 85.4%-99.5%) appeared free of infection by criteria of Masri et al. and Zimmerli et al. at latest followup. The Harris hip score was 61 ± 13 points after the first operation and 82 ± 16 points 2 years after the second operation. This technique is a promising treatment option for periprosthetic infections of the hip in which substantial acetabular defects exclude implantation of a normal spacer and a two-stage revision of the femoral component is favored. Level IV, therapeutic study.

  9. Revised

    DEFF Research Database (Denmark)

    Johannsen, Vivian Kvist; Nord-Larsen, Thomas; Riis-Nielsen, Torben

    This report is a revised analysis of the Danish data on CO2 emissions from forest, afforestation and deforestation for the period 1990 - 2008 and a prognosis for the period until 2020. Revision have included measurements from 2009 in the estimations. The report is funded by the Ministry of Climate...

  10. 75 FR 15391 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revision to Control...

    Science.gov (United States)

    2010-03-29

    ... to control volatile organic compound (VOC) emissions from storage tanks, transport vessels and marine... Promulgation of Air Quality Implementation Plans; Texas; Revision to Control Volatile Organic Compound.... Specifically, this revision subjects owners or operators of VOC storage tanks, transport vessels, and marine...

  11. Developing a model of competence in the operating theatre: psychometric validation of the perceived perioperative competence scale-revised.

    Science.gov (United States)

    Gillespie, Brigid M; Polit, Denise F; Hamlin, Lois; Chaboyer, Wendy

    2012-01-01

    This paper describes the development and validation of the Revised Perioperative Competence Scale (PPCS-R). There is a lack of a psychometrically tested sound self-assessment tools to measure nurses' perceived competence in the operating room. Content validity was established by a panel of international experts and the original 98-item scale was pilot tested with 345 nurses in Queensland, Australia. Following the removal of several items, a national sample that included all 3209 nurses who were members of the Australian College of Operating Room Nurses was surveyed using the 94-item version. Psychometric testing assessed content validity using exploratory factor analysis, internal consistency using Cronbach's alpha, and construct validity using the "known groups" technique. During item reduction, several preliminary factor analyses were performed on two random halves of the sample (n=550). Usable data for psychometric assessment were obtained from 1122 nurses. The original 94-item scale was reduced to 40 items. The final factor analysis using the entire sample resulted in a 40 item six-factor solution. Cronbach's alpha for the 40-item scale was .96. Construct validation demonstrated significant differences (pperceived competence scores relative to years of operating room experience and receipt of specialty education. On the basis of these results, the psychometric properties of the PPCS-R were considered encouraging. Further testing of the tool in different samples of operating room nurses is necessary to enable cross-cultural comparisons. Copyright © 2011 Elsevier Ltd. All rights reserved.

  12. A comparison of revision and rerupture rates of ACL reconstruction between autografts and allografts in the skeletally immature.

    Science.gov (United States)

    Nelson, Ian R; Chen, Jason; Love, Rebecca; Davis, Brent R; Maletis, Gregory B; Funahashi, Tadashi T

    2016-03-01

    Anterior cruciate ligament reconstructions (ACLRs) in skeletally immature patients are increasing. The purpose of this study is to describe the demographics, graft usage, revision, and re-operation rates in skeletally immature ACLRs in the Kaiser Permanente healthcare system. Skeletally immature patients (type; bone-patellar-tendon-bone (BPTB) autograft, hamstring autograft, and any type of allograft. Age, gender, body mass index (BMI), and race were evaluated as confounders. Cox proportional hazard models stratified by surgeon were used to analyse the risk of revision and re-operation. A total of 534 primary ACLR cases were evaluated with a mean follow-up of 2.9 years. The majority were hamstring autografts (n = 388, 72.7%), male (n = 339, 63.9%), and White (n = 232, 43.4%). Median age was 14.9 years, and median BMI was 21.9 kg/m(2). There were 44 (8.2%) aseptic revisions and 48 (9.0%) same-knee re-operations. The incidence rate for revision was BPTB autograft 5.5%, hamstring autograft 7.5%, and allograft 13.2%. After adjusting for confounders and surgeon clustering effect, the risk of aseptic revision and revision between allograft and hamstring autograft did not reach statistical significance. Graft selection differs in skeletally immature patients with a preponderance of surgeries being performed with hamstring tendon autografts. High revision rates were identified for all graft types used, though differences in revision rates across different graft types did not reach statistical significance. Surgeons should be aware of high rates of revision in this skeletally immature young population, although type of graft used did not appear to make a difference. III.

  13. Draft revision of human factors guideline HF-010

    International Nuclear Information System (INIS)

    Lee, Hyun Chul; Lee, Yong Hee; Oh, In Seok; Lee, Jung Woon; Cha, Woo Chang; Lee, Dhong Ha

    2003-05-01

    The Application of Human Factors to the design of Man-Machine Interfaces System(MMIS) in the nuclear power plant is essential to the safety and productivity of the nuclear power plants, human factors standards and guidelines as well as human factors analysis methods and experiments are weightily used to the design application. A Korean engineering company has developed a human factors engineering guideline, so-call HF-010, and has used it for human factors design, however the revision of HF-010 is necessary owing to lack of the contents related to the advanced MMI(Man-Machine Interfaces). As the results of the reviews of HF-010, it is found out that the revision of Section 9. Computer Displays of HF-010 is urgent, thus the revision was drafted on the basis of integrated human factors design guidelines for VDT, human factors design guidelines for PMAS SPADES display, human factors design guidelines for PMAS alarm display, and human factors design guidelines for electronic displays developed by the surveillance and operation support project of KOICS. The draft revision of HF-010 Section 9 proposed in this report can be utilized for the human factors design of the advanced MMI, and the high practical usability of the draft can be kept up through the continuous revision according to the advancement of digital technology

  14. Revised inspection program for nuclear power plants

    International Nuclear Information System (INIS)

    1978-01-01

    The United States Nuclear Regulatory Commission (NRC) regulates nuclear power plants to assure adequate protection of the public and the environment from the dangers associated with nuclear materials. NRC fulfills this responsibility through comprehensive safety reviews of nuclear facilities, licensing of organizations that use nuclear materials, and continuing inspection. The NRC inspection program is currently conducted from the five regional offices in or near Philadelphia, Atlanta, Chicago, Dallas and San Francisco. Inspectors travel from the regional offices to nuclear power plants in various phases of construction, test and operation in order to conduct inspections. However, in June 1977 the Commission approved a revision to the inspection program that will include stationing inspectors at selected plants under construction and at all plants in operation. In addition, the revised program provides for appraising the performance of licensees on a national basis and involves more direct measurement and observation by NRC inspectors of work and tests in progress. The program also includes enhanced career management consisting of improved training and career development for inspectors and other professionals. The report was requested in the Conference Report on the NRC Authorization for Appropriations for Fiscal Year 1978. The report provides a discussion of the basis for both the current and revised inspection programs, describes these programs, and shows how the NRC inspection force will be trained and utilized. In addition, the report includes a discussion of the actions that will be taken to assure the objectivity of inspectors

  15. A financial analysis of revision hip arthroplasty: the economic burden in relation to the national tariff.

    Science.gov (United States)

    Vanhegan, I S; Malik, A K; Jayakumar, P; Ul Islam, S; Haddad, F S

    2012-05-01

    Revision arthroplasty of the hip is expensive owing to the increased cost of pre-operative investigations, surgical implants and instrumentation, protracted hospital stay and drugs. We compared the costs of performing this surgery for aseptic loosening, dislocation, deep infection and peri-prosthetic fracture. Clinical, demographic and economic data were obtained for 305 consecutive revision total hip replacements in 286 patients performed at a tertiary referral centre between 1999 and 2008. The mean total costs for revision surgery in aseptic cases (n = 194) were £11 897 (sd 4629), for septic revision (n = 76) £21 937 (sd 10 965), for peri-prosthetic fracture (n = 24) £18 185 (sd 9124), and for dislocation (n = 11) £10 893 (sd 5476). Surgery for deep infection and peri-prosthetic fracture was associated with longer operating times, increased blood loss and an increase in complications compared to revisions for aseptic loosening. Total inpatient stay was also significantly longer on average (p < 0.001). Financial costs vary significantly by indication, which is not reflected in current National Health Service tariffs.

  16. Graphic Display Development Program. Volume II, Revision 0. Appendices

    International Nuclear Information System (INIS)

    1984-12-01

    The objective of this project is to demonstrate the feasibility and utility of developing a set of graphic displays to support symptom-based emergency operating procedures (EOPs). Development of generic graphic displays is based on Revision 3 of the symptomatic Emergency Procedure Guidelines (EPGs) prepared by the BWR Owners' Group (BWROG), and development of plant-specific graphic displays is based on a set of emergency operating procedures developed from these EPGs

  17. Risk factors for revision of primary total hip arthroplasty: a systematic review

    Directory of Open Access Journals (Sweden)

    Prokopetz Julian JZ

    2012-12-01

    Full Text Available Abstract Background Numerous papers have been published examining risk factors for revision of primary total hip arthroplasty (THA, but there have been no comprehensive systematic literature reviews that summarize the most recent findings across a broad range of potential predictors. Methods We performed a PubMed search for papers published between January, 2000 and November, 2010 that provided data on risk factors for revision of primary THA. We collected data on revision for any reason, as well as on revision for aseptic loosening, infection, or dislocation. For each risk factor that was examined in at least three papers, we summarize the number and direction of statistically significant associations reported. Results Eighty-six papers were included in our review. Factors found to be associated with revision included younger age, greater comorbidity, a diagnosis of avascular necrosis (AVN as compared to osteoarthritis (OA, low surgeon volume, and larger femoral head size. Male sex was associated with revision due to aseptic loosening and infection. Longer operating time was associated with revision due to infection. Smaller femoral head size was associated with revision due to dislocation. Conclusions This systematic review of literature published between 2000 and 2010 identified a range of demographic, clinical, surgical, implant, and provider variables associated with the risk of revision following primary THA. These findings can inform discussions between surgeons and patients relating to the risks and benefits of undergoing total hip arthroplasty.

  18. Deep prosthetic joint infection: a qualitative study of the impact on patients and their experiences of revision surgery

    Science.gov (United States)

    Blom, Ashley W; Whitehouse, Michael R; Gooberman-Hill, Rachael

    2015-01-01

    Objectives Around 1% of patients who have a hip replacement have deep prosthetic joint infection (PJI) afterwards. PJI is often treated with antibiotics plus a single revision operation (1-stage revision), or antibiotics plus a 2-stage revision process involving more than 1 operation. This study aimed to characterise the impact and experience of PJI and treatment on patients, including comparison of 1-stage with 2-stage revision treatment. Design Qualitative semistructured interviews with patients who had undergone surgical revision treatment for PJI. Patients were interviewed between 2 weeks and 12 months postdischarge. Data were audio-recorded, transcribed, anonymised and analysed using a thematic approach, with 20% of transcripts double-coded. Setting Patients from 5 National Health Service (NHS) orthopaedic departments treating PJI in England and Wales were interviewed in their homes (n=18) or at hospital (n=1). Participants 19 patients participated (12 men, 7 women, age range 56–88 years, mean age 73.2 years). Results Participants reported receiving between 1 and 15 revision operations after their primary joint replacement. Analysis indicated that participants made sense of their experience through reference to 3 key phases: the period of symptom onset, the treatment period and protracted recovery after treatment. By conceptualising their experience in this way, and through themes that emerged in these periods, they conveyed the ordeal that PJI represented. Finally, in light of the challenges of PJI, they described the need for support in all of these phases. 2-stage revision had greater impact on participants’ mobility, and further burdens associated with additional complications. Conclusions Deep PJI impacted on all aspects of patients’ lives. 2-stage revision had greater impact than 1-stage revision on participants’ well-being because the time in between revision procedures meant long periods of immobility and related psychological distress

  19. Calculation code revised MIXSET for Purex process

    International Nuclear Information System (INIS)

    Gonda, Kozo; Oka, Koichiro; Fukuda, Shoji.

    1979-02-01

    Revised MIXSET is a FORTRAN IV calculation code developed to simulate steady and transient behaviors of the Purex extraction process and calculate the optimum operating condition of the process. Revised MIXSET includes all the functions of MIXSET code as shown below. a) Maximum chemical system of eight components can be handled with or without mutual dependence of the distribution of components. b) The flowrate and concentration of feed can be renewed successively at any state, transient or steady, for searching optimum operating conditions. c) Optimum inputs of feed concentrations and flowrates can be calculated to satisfy both of specification and recovery rate of a product. d) Radioactive decay reactions can be handled on each component. Besides these functions, the following chemical reactions concerned in Purex process are newly-included in Revised MIXSET code and the quantitative changes of components such as H + , U(IV), U(VI), Pu(III), Pu(IV), NH 2 OH, N 2 H 4 can be simulated. 1st Gr. (i) reduction of Pu(IV); U 4+ + 2Pu 4+ + 2H 2 O → UO 2 2+ + 2Pu 3+ + 4H + . (ii) oxidation of Pu(III); 2Pu 3+ + 3H + + NO 3 - → 2Pu 4+ + HNO 2 + H 2 O. (iii) oxidation of U(IV); U 4+ + NO 3 - + H 2 O → UO 2 2+ + H + + HNO 2 2U 4+ + O 2 + 2H 2 O → 2UO 2 2+ + 4H + . (iv) decomposition of HNO 2 ; HNO 2 + N 2 H 5 + → HN 3 + 2H 2 O + H + . (author)

  20. Revision of the ASME nuclear quality assurance standard and its historical background

    International Nuclear Information System (INIS)

    Suzuki, Tetsuya

    2009-01-01

    ASME NQA-1-2008 'Quality Assurance Requirements for Nuclear Facility Applications' will be endorsed by US NRC by the end of 2009. This standard will apply to design, construction and operation of nuclear power plants newly erected in USA. It is important to Japanese vendors developing nuclear business in USA. Historical background, significance of revision and main revised points of the ASME nuclear quality assurance standard are described in the present paper. (T. Tanaka)

  1. Operating and Assurance Program Plan. Revision 4

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The LBL Operating and Assurance Program (OAP) is a management system and a set of requirements designed to maintain the level of performance necessary to achieve LBL`s programmatic and administrative objectives effectively and safely through the application of quality assurance and related conduct of operations and maintenance management principles. Implement an LBL management philosophy that supports and encourages continual improvement in performance and quality at the Laboratory. Provide an integrated approach to compliance with applicable regulatory requirements and DOE orders. The OAP is intended to meet the requirements of DOE Order 5700.6C, Quality Assurance. The Program also contains management system elements of DOE Orders 5480.19, Conduct of Operations Requirements for DOE Facilities; 5480.25, Safety of Accelerator Facilities; and 4330.4A, Maintenance Management Program, and is meant to integrate these elements into the overall LBL approach to Laboratory management. The requirements of this program apply to LBL employees and organizations, and to contractors and facility users as managed by their LBL sponsors. They are also applicable to external vendors and suppliers as specified in procurement documents and contracts.

  2. Flight Test Guide (Part 61 Revised): Instrument Pilot: Helicopter.

    Science.gov (United States)

    Federal Aviation Administration (DOT), Washington, DC. Flight Standards Service.

    The guide provides an outline of the skills required to pass the flight test for an Instrument Pilot Helicopter Rating under Part 61 (revised) of Federal Aviation Regulations. General procedures for flight tests are described and the following pilot operations outlined: maneuvering by reference to instruments, IFR navigation, instrument…

  3. Nuclear Regulatory Commission Human Factors Program Plan. Revision 2

    International Nuclear Information System (INIS)

    1986-04-01

    This document is the Second Annual Revision to the NRC Human Factors Program Plan. The first edition was published in August 1983. Revision 1 was published in July of 1984. Purpose of the NRC Human Factors Program is to ensure that proper consideration is given to human factors in the design and operation of nuclear power plants. This document describes the plans of the Office of Nuclear Reactor Regulation to address high priority human factors concerns of importance to reactor safety in FY 1986 and FY 1987. Revision 2 of the plan incorporates recent Commission decisions and policies bearing on the human factors aspects of reactor safety regulation. With a few exceptions, the principal changes from prior editions reflect a shift from developing new requirements to staff evaluation of industry progress in resolving human factors issues. The plan addresses seven major program elements: (1) Training, (2) Licensing Examinations, (3) Procedures, (4) Man-Machine Interface, (5) Staffing and Qualifications, (6) Management and Organization, and (7) Human Performance

  4. Revision Hip Arthroscopy Indications and Outcomes: A Systematic Review.

    Science.gov (United States)

    Sardana, Vandit; Philippon, Marc J; de Sa, Darren; Bedi, Asheesh; Ye, Lily; Simunovic, Nicole; Ayeni, Olufemi R

    2015-10-01

    To identify the indications and outcomes in patients undergoing revision hip arthroscopy. The electronic databases Embase, Medline, HealthStar, and PubMed were searched from 1946 to July 19, 2014. Two blinded reviewers searched, screened, and evaluated the data quality of the studies using the Methodological Index for Non-Randomized Studies scale. Data were abstracted in duplicate. Agreement and descriptive statistics are presented. Six studies were included (3 prospective case series and 3 retrospective chart reviews), with a total of 448 hips examined. The most common indications for revision hip arthroscopy included residual femoroacetabular impingement (FAI), labral tears, and chondral lesions. The mean interval between revision arthroscopy and the index procedure was 25.6 months. Overall, the modified Harris Hip Score improved by a mean of 33.6% (19.3 points) from the baseline score at 1-year follow-up. In 14.6% of patients, further surgical procedures were required, including re-revision hip arthroscopy (8.0%), total hip replacement (5.6%), and hip resurfacing (1.0%). Female patients more commonly underwent revision hip arthroscopy (59.7%). The current evidence examined in this review supports revision hip arthroscopy as a successful intervention to improve functional outcomes (modified Harris Hip Score) and relieve pain in patients with residual symptoms after primary FAI surgery, although the outcomes are inferior when compared with a matched cohort of patients undergoing primary hip arthroscopy for FAI. The main indication for revision is a candidate who has symptoms due to residual cam- or pincer-type deformity that was either unaddressed or under-resected during the index operation. However, it is important to consider that the studies included in this review are of low-quality evidence. Surgeons should consider incorporating a minimum 2-year follow-up for individuals after index hip-preservation surgery because revisions tended to occur within this

  5. Non-Power Reactor Operator Licensing Examiner Standards

    International Nuclear Information System (INIS)

    1994-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR Part 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, this standard will be revised periodically to accommodate comments and reflect new information or experience

  6. 49 CFR 236.919 - Operations and Maintenance Manual.

    Science.gov (United States)

    2010-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Standards for Processor-Based Signal and Train Control Systems § 236.919 Operations and Maintenance Manual. (a... identify all software versions, revisions, and revision dates. Plans must be legible and correct. (c...

  7. 49 CFR 236.1039 - Operations and Maintenance Manual.

    Science.gov (United States)

    2010-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1039 Operations and Maintenance Manual. (a) The railroad shall catalog and... software versions, revisions, and revision dates. Plans must be legible and correct. (c) Hardware, software...

  8. Revising and editing for translators

    CERN Document Server

    Mossop, Brian

    2014-01-01

    Revising and Editing for Translators provides guidance and learning materials for translation students learning to edit texts written by others, and professional translators wishing to improve their self-revision ability or learning to revise the work of others. Editing is understood as making corrections and improvements to texts, with particular attention to tailoring them to the given readership. Revising is this same task applied to draft translations. The linguistic work of editors and revisers is related to the professional situations in which they work. Mossop offers in-depth coverage of a wide range of topics, including copyediting, style editing, structural editing, checking for consistency, revising procedures and principles, and translation quality assessment. This third edition provides extended coverage of computer aids for revisers, and of the different degrees of revision suited to different texts. The inclusion of suggested activities and exercises, numerous real-world examples, a proposed gra...

  9. 78 FR 21245 - Continuity of Operations Plan

    Science.gov (United States)

    2013-04-10

    ...; Order No. 778] Continuity of Operations Plan AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule. SUMMARY: In this Final Rule the Commission revises its Continuity of Operations Plan... Commission's Continuity of Operations Plan (COOP) regulations to incorporate its regional offices into the...

  10. Loosening After Acetabular Revision

    DEFF Research Database (Denmark)

    Beckmann, Nicholas A.; Weiss, Stefan; Klotz, Matthias C.M.

    2014-01-01

    The best method of revision acetabular arthroplasty remains unclear. Consequently, we reviewed the literature on the treatment of revision acetabular arthroplasty using revision rings (1541 cases; mean follow-up (FU) 5.7 years) and Trabecular Metal, or TM, implants (1959 cases; mean FU 3.7 years...

  11. Fixation of revision implants is improved by a surgical technique to crack the sclerotic bone rim.

    Science.gov (United States)

    Kold, Søren; Bechtold, Joan E; Mouzin, Olivier; Elmengaard, Brian; Chen, Xinqian; Søballe, Kjeld

    2005-03-01

    Revision joint replacement has poorer outcomes compared with primary joint replacement, and these poor outcomes have been associated with poorer fixation. We investigated a surgical technique done during the revision operation to improve access from the marrow space to the implant interface by locally cracking the sclerotic bone rim that forms during aseptic loosening. Sixteen implants were inserted bilaterally by distal femur articulation of the knee joint of eight dogs, using our controlled experimental model that replicates the revision setting (sclerotic bone rim, dense fibrous tissue, macrophages, elevated cytokines) by pistoning a loaded 6.0-mm implant 500 microm into the distal femur with particulate PE. At 8 weeks, one of two revision procedures was done. Both revision procedures included complete removal of the membrane, scraping, lavaging, and inserting a revision plasma-spray Ti implant. The crack revision procedure also used a splined tool to circumferentially locally perforate the sclerotic bone rim before insertion of an identical revision implant. Superior fixation was achieved with the cracking procedure in this experimental model. Revision implants inserted with the rim cracking procedure had a significantly higher pushout strength (fivefold median increase) and energy to failure (sixfold median increase), compared with the control revision procedure. Additional evaluation is needed of local perforation of sclerotic bone rim as a simple bone-sparing means to improve revision implant fixation and thereby increase revision implant longevity.

  12. 77 FR 75362 - Funding and Fiscal Affairs, Loan Policies and Operations, and Funding Operations

    Science.gov (United States)

    2012-12-20

    ... FARM CREDIT ADMINISTRATION 12 CFR Part 615 Funding and Fiscal Affairs, Loan Policies and Operations, and Funding Operations CFR Correction 0 In Title 12 of the Code of Federal Regulations, Parts 600 to 899, revised as of January 1, 2012, on page 209, Subpart S, consisting of Sec. 615.5570, is...

  13. Fixation of revision implants is improved by new surgical technique to crack the sclerotic endosteal rim.

    Science.gov (United States)

    Kold, S; Soballe, K; Mouzin, O; Chen, Xiangmei; Toft, M; Bechtold, J

    2002-01-01

    We used an experimental model producing a tissue response with a sclerotic endosteal neo-cortical rim associated with implant loosening in humans: a 6 mm PMMA cylinder pistoned 500 m concentrically in a 7.5 mm hole, with polyethylene particles. At a second operation at eight weeks, the standard revision procedure removed the fibrous membrane in one knee, and the crack revision procedure was used to crack the sclerotic endosteal rim in the contralateral knee. Once stability was achieved following the revision procedures, loaded Ti plasma sprayed implants were inserted into the revision cavities of 8 dogs for an additional 4 weeks. Revision implant fixation (ultimate shear strength and energy absorption) was significantly enhanced by cracking the sclerotic endosteal rim. In conclusion, we demonstrated a simple technique of cracking the sclerotic endosteal rim as an additional method for improving revision fixation. (Hip International 2002; 2: 77-9).

  14. Vault Safety and Inventory System users manual, PRIME 2350. Revision 1

    International Nuclear Information System (INIS)

    Downey, N.J.

    1994-01-01

    This revision is issued to request review of the attached document: VSIS User Manual, PRIME 2350, which provides user information for the operation of the VSIS (Vault Safety and Inventory System). It describes operational aspects of Prime 2350 minicomputer and vault data acquisition equipment. It also describes the User's Main Menu and menu functions, including REPORTS. Also, system procedures for the Prime 2350 minicomputer are covered

  15. Vault Safety and Inventory System users manual, PRIME 2350. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Downey, N.J.

    1994-12-14

    This revision is issued to request review of the attached document: VSIS User Manual, PRIME 2350, which provides user information for the operation of the VSIS (Vault Safety and Inventory System). It describes operational aspects of Prime 2350 minicomputer and vault data acquisition equipment. It also describes the User`s Main Menu and menu functions, including REPORTS. Also, system procedures for the Prime 2350 minicomputer are covered.

  16. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Lo, R.; Snyder, B.

    1982-02-01

    This NRC Plan, which defines NRC's functional role in cleanup operations at Three Mile Island Unit 2 and outlines NRC's regulatory responsibilities in fulfilling this role, is the first revision to the initial plan issued in July 1980 (NUREG-0698). Since 1980, a number of policy developments have occurred which will have an impact on the course of cleanup operations. This revision reflects these developments in the area of NRC's review and approval process with regard to cleanup operations as well as NRC's interface with the Department of Energy's involvement in the cleanup and waste disposal. This revision is also intended to update the cleanup schedule by presenting the cleanup progress that has taken place and NRC's role in ongoing and future cleanup activities

  17. [Results of revision after failed surgical treatment for traumatic anterior shoulder instability].

    Science.gov (United States)

    Lópiz-Morales, Y; Alcobe-Bonilla, J; García-Fernández, C; Francés-Borrego, A; Otero-Fernández, R; Marco-Martínez, F

    2013-01-01

    Persistent or recurrent glenohumeral instability after a previous operative stabilization can be a complex problem. Our aim is to establish the incidence of recurrence and its revision surgery, and to analyse the functional results of the revision instability surgery, as well as to determine surgical protocols to perform it. A retrospective analysis was conducted on 16 patients with recurrent instability out of 164 patients operated on between 1999 and 2011. The mean follow-up was 57 months and the mean age was 29 years. To evaluate functional outcome we employed Constant, Rowe, UCLA scores and the visual analogue scale. Of the 12 patients who failed the initial arthroscopic surgery, 6 patients underwent an arthroscopic antero-inferior labrum repair technique, 4 using open labrum repair techniques, and 2 coracoid transfer. The two cases of open surgery with recurrences underwent surgery for coracoid transfer. Results of the Constant score were excellent or good in 64% of patients. Surgical revision of instability is a complex surgery essentially for two reasons: the difficulty in recognising the problem, and the technical demand (greater variety and the increasingly complex techniques). Copyright © 2012 SECOT. Published by Elsevier Espana. All rights reserved.

  18. User`s guide for the irradiation of experiments in the FTR. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-07-01

    This document provides Revision 3 updates the FTR Users Guide. Revision 3 updates Appendix 1 (FFTF Technical Specifications) to include the following: Documentation of the acceptability of handling metal fuel assemblies in the Closed Loop Ex-Vessel Handling Machine (CLEM) and storing them in the Interim Decay Storage (IDS) vessel. Reactivity limit version (utilizing existing FSAR analysis bounds) to allow for the larger beta-effective associated with the addition of enriched uranium metal and oxide experiments to the core. Operational temperature limits for Open Test Assemblies (OTAs) have been expanded to differentiate between 40-foot experiment test articles, 28-foot Post Irradiation Open Test Assemblies (PIOTAs) and the 28-foot Loose Parts Monitor Assemblies (LMPAs) operating under FFTF core Engineering cognizance.

  19. Uranium hexafluoride: A manual of good practice ORO 651 revision 6

    Energy Technology Data Exchange (ETDEWEB)

    Dyer, R.H. [Department of Energy, Oak Ridge, TN (United States)

    1991-12-31

    The United States Department of Energy publishes a document containing UF{sub 6} handling procedures and descriptions of the approved UF{sub 6} cylinders. Since its initial publication in 1966, it has been frequently revised to provide more and better information. The principle additions to the sixth revision which will be discussed are: (1) more detail on the physical and chemical properties of UF{sub 6}; (2) cold trap description and operation; (3) cylinder emptying and filling concepts; (4) basis for cylinder fill limits; (5) short- and long-term cylinder storage; and (6) cylinder photographs and drawings showing major dimensions.

  20. 77 FR 64920 - Revisions to Reliability Standard for Transmission Vegetation Management

    Science.gov (United States)

    2012-10-24

    ... reliability of the Bulk Electric System.'' NERC defines ``System Operating Limit'' as ``[t]he value (such as... values or gives reason to revisit the Reliability Standard. Accordingly, consistent with the activity...] Revisions to Reliability Standard for Transmission Vegetation Management AGENCY: Federal Energy Regulatory...

  1. Comparative Analysis of Direct Hospital Care Costs between Aseptic and Two-Stage Septic Knee Revision

    Science.gov (United States)

    Kasch, Richard; Merk, Sebastian; Assmann, Grit; Lahm, Andreas; Napp, Matthias; Merk, Harry; Flessa, Steffen

    2017-01-01

    Background The most common intermediate and long-term complications of total knee arthroplasty (TKA) include aseptic and septic failure of prosthetic joints. These complications cause suffering, and their management is expensive. In the future the number of revision TKA will increase, which involves a greater financial burden. Little concrete data about direct costs for aseptic and two-stage septic knee revisions with an in depth-analysis of septic explantation and implantation is available. Questions/Purposes A retrospective consecutive analysis of the major partial costs involved in revision TKA for aseptic and septic failure was undertaken to compare 1) demographic and clinical characteristics, and 2) variable direct costs (from a hospital department’s perspective) between patients who underwent single-stage aseptic and two-stage septic revision of TKA in a hospital providing maximum care. We separately analyze the explantation and implantation procedures in septic revision cases and identify the major cost drivers of knee revision operations. Methods A total of 106 consecutive patients (71 aseptic and 35 septic) was included. All direct costs of diagnosis, surgery, and treatment from the hospital department’s perspective were calculated as real purchase prices. Personnel involvement was calculated in units of minutes. Results Aseptic versus septic revisions differed significantly in terms of length of hospital stay (15.2 vs. 39.9 days), number of reported secondary diagnoses (6.3 vs. 9.8) and incision-suture time (108.3 min vs. 193.2 min). The management of septic revision TKA was significantly more expensive than that of aseptic failure ($12,223.79 vs. $6,749.43) (p costs of explantation stage ($4,540.46) were lower than aseptic revision TKA ($6,749.43) which were again lower than those of the septic implantation stage ($7,683.33). All mean costs of stays were not comparable as they differ significantly (p cost drivers were the cost of the implant and

  2. Revising Lecture Notes: How Revision, Pauses, and Partners Affect Note Taking and Achievement

    Science.gov (United States)

    Luo, Linlin; Kiewra, Kenneth A.; Samuelson, Lydia

    2016-01-01

    Note taking has been categorized as a two-stage process: the recording of notes and the review of notes. We contend that note taking might best involve a three-stage process where the missing stage is revision. This study investigated the benefits of revising lecture notes and addressed two questions: First, is revision more effective than…

  3. Engineering work plan for container venting system drill press assembly troubleshooting. Revision 1

    International Nuclear Information System (INIS)

    Prather, M.C.

    1994-11-01

    This work plan is for troubleshooting the current CVS drill press to ensure that the drill bit assembly doesn't bind in the press plate. A drill press assembly has been fabricated for the Container Venting System (CVS). The drill bit assembly has bound in the press plate in previous revisions of this design. Initial troubleshooting of the drill press per Rev. 0 of this work plan was performed at the 200W Kaiser Machine Shop under Work Package 2H9401670F, Internal Work Order E20027. The drill press operated without jamming. Then, during the pre-operational test on 11/14/17 and the operational test on 11/17/94, two drum lids were drilled. Immediately after the test on 11/17/94, the drill was again operated, and it jammed. An inspection found shavings at the bottom of the drill bit assembly, between the drill bit sleeve and the press plate bore. This revised work plan provides direction for the machine shop to diagnose and correct this recent problem

  4. Outcomes of revision external dacryocystorhinostomy and nasal intubation by bicanalicular silicone tubing under endonasal endoscopic guidance.

    Science.gov (United States)

    Ari, Seyhmus; Kürşat Cingü, Abdullah; Sahin, Alparslan; Gün, Ramazan; Kiniş, Vefa; Caça, Ihsan

    2012-01-01

    To evaluate the long-term treatment outcomes in patients who underwent revision of external dacryocystorhinostomy (DCR) and nasal intubation by bicanalicular silicone tubing (BSTI) under endonasal endoscopic guidance. Data from 28 patients with recurrent dacryocystitis were retrospectively reviewed. Revision external DCR and bicanalicular nasal intubation by silicone tubing under endonasal endoscopic guidance was performed in 28 eyes of 28 patients. The patients were evaluated with respect to the reason of recurrence, time to recurrence, time to revision, duration of follow-up and surgical success. Endoscopic endonasal examination detected an osteotomy-side obstruction by the excessive granulation tissue in 24 patients (86%), nasal septal deviation in three patients (10%) and nasal polyp in one patient (4%). Recurrence occurred after a mean duration of 5.3±3.7 months following the first operation. The mean time between the first DCR operation and the revision DCR was 11.5 ± 9.3 months. After a mean follow-up of 14.9±7.8 months, the rate of anatomic success alone was 85% (24/28); the rate of subjective success was 78% (22/28). Revision external DCR and bicanalicular nasal intubation by silicone tubing under endonasal endoscopic guidance can be recommended in patients with recurrent dacryocystitis as a surgical approach that achieves satisfactory objective and subjective success rates.

  5. Acetabular Cup Revision.

    Science.gov (United States)

    Kim, Young-Ho

    2017-09-01

    The use of acetabular cup revision arthroplasty is on the rise as demands for total hip arthroplasty, improved life expectancies, and the need for individual activity increase. For an acetabular cup revision to be successful, the cup should gain stable fixation within the remaining supportive bone of the acetabulum. Since the patient's remaining supportive acetabular bone stock plays an important role in the success of revision, accurate classification of the degree of acetabular bone defect is necessary. The Paprosky classification system is most commonly used when determining the location and degree of acetabular bone loss. Common treatment options include: acetabular liner exchange, high hip center, oblong cup, trabecular metal cup with augment, bipolar cup, bulk structural graft, cemented cup, uncemented cup including jumbo cup, acetabular reinforcement device (cage), trabecular metal cup cage. The optimal treatment option is dependent upon the degree of the discontinuity, the amount of available bone stock and the likelihood of achieving stable fixation upon supportive host bone. To achieve successful acetabular cup revision, accurate evaluation of bone defect preoperatively and intraoperatively, proper choice of method of acetabular revision according to the evaluation of acetabular bone deficiency, proper technique to get primary stability of implant such as precise grafting technique, and stable fixation of implant are mandatory.

  6. Developments in UK defect assessment procedures R6 revision 4 and BS7910

    International Nuclear Information System (INIS)

    Sharples, J.K.; Ainsworth, R.A.; Budden, P.J.

    2003-01-01

    The R6 defect assessment procedures have been developed over many years by the UK nuclear power generation industry. The procedures are updated on a regular basis, taking into account the information resulting from the R6 development programme and other available information worldwide. A major revision, Revision 4, of the R6 procedures was released in 2000. Just prior to that release, in 1999, the British Standards flaw assessment procedure BS7910 was issued and combined and updated the previous published documents PD6493 and PD6539, for components operating at temperatures where creep was negligible and important, respectively. BS79l0 is also under constant development. This paper provides a brief overview of the BS7910 and R6 Revision 4 procedures and describes updates to the respective documents since they were first issued. Some ongoing developments which will lead to future revisions to the documents are also described. (author)

  7. Application of revised procedure on determining large excess reactivity of operating reactor. Fuel addition method

    International Nuclear Information System (INIS)

    Nagao, Yoshiharu

    2002-01-01

    The fuel addition method or the neutron absorption substitution method have been used for determination of large excess multiplication factor of large sized reactors. It has been pointed out, however, that all the experimental methods are possibly not free from the substantially large systematic error up to 20%, when the value of the excess multiplication factor exceeds about 15%Δk. Then, a basic idea of a revised procedure was proposed to cope with the problem, which converts the increase of multiplication factor in an actual core to that in a virtual core by calculation, because its value is in principle defined not for the former but the latter core. This paper proves that the revised procedure is able to be applicable for large sized research and test reactors through the theoretical analyses on the measurements undertaken at the JMTRC and JMTR cores. The values of excess multiplication factor are accurately determined utilizing the whole core calculation by the Monte Carlo code MCNP4A. (author)

  8. A revision of the cask designers guide for the '90s

    International Nuclear Information System (INIS)

    Shappert, L.B.; Green, V.M.

    1993-01-01

    DOE has requested that ORNL initiate a revision to NSIC-68, A Guide for the Design, Fabrication, and Operation of Shipping Casks for Nuclear Applications, commonly called the Cask Designers Guide. This revision, called the Cask Handbook, has two goals: (1) to improve the quality of SARPs that are submitted to DOE, and (2) to provide up-to-date information on the design of spent fuel shipping casks, including information on fabrication, quality assurance, SARP preparation, certification, use, maintenance, and other general topics. The revision provides guidance that will help engineers through the cask licensing process, in part, by providing as much regulator-approved data and 'lessons-learned' information as possible. The effort is sponsored by DOE-Environmental, Safety and Health (EH), guided by Transportation Technology staff members at ORNL, and the information is being generated by experts in the various technical fields. (J.P.N.)

  9. Failure of aseptic revision total knee arthroplasties.

    Science.gov (United States)

    Leta, Tesfaye H; Lygre, Stein Håkon L; Skredderstuen, Arne; Hallan, Geir; Furnes, Ove

    2015-02-01

    In Norway, the proportion of revision knee arthroplasties increased from 6.9% in 1994 to 8.5% in 2011. However, there is limited information on the epidemiology and causes of subsequent failure of revision knee arthroplasty. We therefore studied survival rate and determined the modes of failure of aseptic revision total knee arthroplasties. This study was based on 1,016 aseptic revision total knee arthroplasties reported to the Norwegian Arthroplasty Register between 1994 and 2011. Revisions done for infections were not included. Kaplan-Meier and Cox regression analyses were used to assess the survival rate and the relative risk of re-revision with all causes of re-revision as endpoint. 145 knees failed after revision total knee arthroplasty. Deep infection was the most frequent cause of re-revision (28%), followed by instability (26%), loose tibial component (17%), and pain (10%). The cumulative survival rate for revision total knee arthroplasties was 85% at 5 years, 78% at 10 years, and 71% at 15 years. Revision total knee arthroplasties with exchange of the femoral or tibial component exclusively had a higher risk of re-revision (RR = 1.7) than those with exchange of the whole prosthesis. The risk of re-revision was higher for men (RR = 2.0) and for patients aged less than 60 years (RR = 1.6). In terms of implant survival, revision of the whole implant was better than revision of 1 component only. Young age and male sex were risk factors for re-revision. Deep infection was the most frequent cause of failure of revision of aseptic total knee arthroplasties.

  10. 2016 National Census of Ferry Operators (Revised 03/18)

    Data.gov (United States)

    Department of Transportation — The 2016 NCFO dataset is comprised of the responses of all operators who completed the 2016 Census, reporting 2015 calendar year ferry operations. The NCFO Flat File...

  11. 76 FR 39357 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Science.gov (United States)

    2011-07-06

    ...EPA is proposing to approve revisions to the Imperial County Air Pollution Control District (ICAPCD), Kern County Air Pollution Control District (KCAPCD), and Ventura County Air Pollution Control District (VCAPCD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from architectural coating operations. We are proposing to approve local rules to regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  12. Proposed revision of the Cumberland System Power Marketing Policy and subsequent contracts

    International Nuclear Information System (INIS)

    1992-01-01

    Southeastern Power Administration has prepared an Environmental Assessment (DOE/EA-0811) evaluating the proposed revision of the Cumberland System Power Marketing Policy and Subsequent Contracts. The findings of the Environmental Assessment (EA) are: the only significant change from the existing policy will be the term of the contracts executed under the revised policy; and there will be no addition of major new generation resources; there will be no new loads; there will be no major changes in the operating parameters of power generation resources. This paper discusses the need for action, the alternative and the environmental impacts

  13. LANDSAT-D ground segment operations plan, revision A

    Science.gov (United States)

    Evans, B.

    1982-01-01

    The basic concept for the utilization of LANDSAT ground processing resources is described. Only the steady state activities that support normal ground processing are addressed. This ground segment operations plan covers all processing of the multispectral scanner and the processing of thematic mapper through data acquisition and payload correction data generation for the LANDSAT 4 mission. The capabilities embedded in the hardware and software elements are presented from an operations viewpoint. The personnel assignments associated with each functional process and the mechanisms available for controlling the overall data flow are identified.

  14. Bibliocable. Revised Edition.

    Science.gov (United States)

    Cable Television Information Center, Washington, DC.

    This selective, annotated bibliography is a revision of the original published in 1972 (ED 071 402). Some 104 books, articles, and reports included here deal with access, applications, franchising, regulation, technology, and other aspects of cable television. The listings are of two types in each category. First are revisions of the original…

  15. Updated and revised neutron reaction data for 237Np

    Directory of Open Access Journals (Sweden)

    Chen Guochang

    2017-01-01

    Full Text Available Nuclear data with high accuracy for minor actinides play an important role in nuclear technology applications, including reactor design and operation, fuel cycle, estimation of the amount of minor actinides in high burn-up reactors and the minor actinides transmutation. Based on the evaluated experimental data, the updated and revised evaluation of a full set of n+237Np nuclear data from 10−5 eV ∼ 20 MeV are carried out and recommended. Mainly revised quantities are neutron multiplicities from fission reaction, inelastic, fission, (n, 2n and (n, γ reaction cross sections as well as angular distribution and so on. The promising results are obtained when the renewal evaluated data of 237Np will be used to instead of the evaluated data in CENDL-3.1 database.

  16. Clinical Outcomes of Reoperation for Failed Antireflux Operations.

    Science.gov (United States)

    Wilshire, Candice L; Louie, Brian E; Shultz, Dale; Jutric, Zeljka; Farivar, Alexander S; Aye, Ralph W

    2016-04-01

    Up to 18% of patients undergoing antireflux operations will require reoperation. Authors caution that with each additional reoperation, fewer patients achieve satisfaction. The quality of life in patients who underwent revision operations was compared with patients who underwent primary antireflux operations to determine the effectiveness of revision operations. We retrospectively reviewed patients who underwent revision after failed antireflux operations from 2004 to 2014. Patients were divided into two groups: first reoperation (Reop[1]) and more than one reoperation (Reop[>1]). For comparison, a control group of patients who underwent primary antireflux operations was included. Patients underwent quality of life assessment preoperatively and postoperatively. We identified 105 reoperative patients: 94 Reop(1), 11 Reop(>1), and 112 controls. The primary reason for failure was combined fundoplication herniation and slippage. Morbidity, mortality, and readmission rates were similar in all groups. Postoperative outcomes were improved in all groups but to a lesser degree in subsequent reoperations. Gastroesophageal Reflux Disease Health-Related Quality of Life: controls, 20.0 to 2.0; Reop(1), 26.5 to 4.0; and Reop(>1), 13.0 to 2.0. Quality of Life in Reflux and Dyspepsia: controls, 4.5 to 7.0; Reop(1), 3.7 to 6.7; and Reop(>1), 3.5 to 5.8. Dysphagia Severity Score: controls, 44.0 to 45.0; Reop(1), 36.0 to 45.0; and Reop(>1), 30.8 to 45.0. Patients undergoing revision antireflux operations have improved quality of life, relatively normal swallowing, and primary symptom resolution at a median of 20 months postoperatively. However, patients who undergo more than one reoperation have lower quality of life scores and less improvement in dysphagia, suggesting that other procedures such as Roux-en-Y or short colon interposition, should be considered after a failed initial reoperation. Copyright © 2016 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights

  17. 75 FR 65365 - Disaster Temporary Housing Operational Guide

    Science.gov (United States)

    2010-10-22

    ... guide does not have the force or effect of law. FEMA seeks comment on the proposed operational guide... comments received, FEMA may make appropriate revisions to the proposed operational guide. Although FEMA... http://www.regulations.gov . The final operational guide will not have the force or effect of law...

  18. Operability test procedure for 244-U DCRT. Revision 1

    International Nuclear Information System (INIS)

    Erhart, M.F.

    1995-01-01

    This OPT will insure the operability of various systems and their general equipment, used in the operation of the 244-U DCRT. Systems that will be tested include the following: Leak Detection Systems; Heat Trace System; Vessel Temperature Measurement System; Dip Tube Water System; Weight Factor and Specific Gravity System; Instrument Air System; Vessel Liquid Level System; Vessel Liquid Transfer System; and Exhauster Differential Pressure Indicating Controller System. The tests will cover checks on equipment operation and electrical interlocks, but will not cover checks on associated annunciator alarms which are covered in a separate OTP

  19. IMPACT OF A REVISED {sup 25}Mg(p, {gamma}){sup 26}Al REACTION RATE ON THE OPERATION OF THE Mg-Al CYCLE

    Energy Technology Data Exchange (ETDEWEB)

    Straniero, O.; Cristallo, S. [INAF-Osservatorio Astronomico di Collurania, Teramo (Italy); Imbriani, G.; DiLeva, A.; Limata, B. [INFN Sezione di Napoli, Napoli (Italy); Strieder, F. [Institut fuer Experimentalphysik, Ruhr-Universitaet Bochum, Bochum (Germany); Bemmerer, D. [Helmholtz-Zentrum Dresden-Rossendorf, Bautzner Landstr. 400 (Germany); Broggini, C.; Caciolli, A. [Istituto Nazionale di Fisica Nucleare (INFN), Sezione di Padova, via Marzolo 8, I-35131 Padova (Italy); Corvisiero, P.; Costantini, H.; Lemut, A. [Universita di Genova and INFN Sezione di Genova, Genova (Italy); Formicola, A.; Gustavino, C.; Junker, M. [INFN, Laboratori Nazionali del Gran Sasso (LNGS), Assergi (AQ) (Italy); Elekes, Z.; Fueloep, Zs.; Gyuerky, Gy. [Institute of Nuclear Research (ATOMKI), Debrecen (Hungary); Gervino, G. [Dipartimento di Fisica Universita di Torino and INFN Sezione di Torino, Torino (Italy); Guglielmetti, A., E-mail: straniero@oa-teramo.inaf.it [Universita degli Studi di Milano and INFN, Sezione di Milano (Italy); and others

    2013-02-15

    Proton captures on Mg isotopes play an important role in the Mg-Al cycle active in stellar H-burning regions. In particular, low-energy nuclear resonances in the {sup 25}Mg(p, {gamma}){sup 26}Al reaction affect the production of radioactive {sup 26}Al{sup gs} as well as the resulting Mg/Al abundance ratio. Reliable estimations of these quantities require precise measurements of the strengths of low-energy resonances. Based on a new experimental study performed at the Laboratory for Underground Nuclear Astrophysics, we provide revised rates of the {sup 25}Mg(p, {gamma}){sup 26}Al{sup gs} and the {sup 25}Mg(p, {gamma}){sup 26}Al {sup m} reactions with corresponding uncertainties. In the temperature range 50-150 MK, the new recommended rate of {sup 26}Al {sup m} production is up to five times higher than previously assumed. In addition, at T = 100 MK, the revised total reaction rate is a factor of two higher. Note that this is the range of temperature at which the Mg-Al cycle operates in a H-burning zone. The effects of this revision are discussed. Due to the significantly larger {sup 25}Mg(p, {gamma}){sup 26}Al {sup m} rate, the estimated production of {sup 26}Al{sup gs} in H-burning regions is less efficient than previously obtained. As a result, the new rates should imply a smaller contribution from Wolf-Rayet stars to the galactic {sup 26}Al budget. Similarly, we show that the asymptotic giant branch (AGB) extra-mixing scenario does not appear able to explain the most extreme values of {sup 26}Al/{sup 27}Al, i.e., >10{sup -2}, found in some O-rich presolar grains. Finally, the substantial increase of the total reaction rate makes the hypothesis of self-pollution by massive AGBs a more robust explanation for the Mg-Al anticorrelation observed in globular-cluster stars.

  20. An Updated Comprehensive Risk Analysis for Radioisotopes Identified of High Risk to National Security in the Event of a Radiological Dispersion Device Scenario

    Science.gov (United States)

    Robinson, Alexandra R.

    An updated global survey of radioisotope production and distribution was completed and subjected to a revised "down-selection methodology" to determine those radioisotopes that should be classified as potential national security risks based on availability and key physical characteristics that could be exploited in a hypothetical radiological dispersion device. The potential at-risk radioisotopes then were used in a modeling software suite known as Turbo FRMAC, developed by Sandia National Laboratories, to characterize plausible contamination maps known as Protective Action Guideline Zone Maps. This software also was used to calculate the whole body dose equivalent for exposed individuals based on various dispersion parameters and scenarios. Derived Response Levels then were determined for each radioisotope using: 1) target doses to members of the public provided by the U.S. EPA, and 2) occupational dose limits provided by the U.S. Nuclear Regulatory Commission. The limiting Derived Response Level for each radioisotope also was determined.

  1. Preliminary hazards analysis of thermal scrap stabilization system. Revision 1

    International Nuclear Information System (INIS)

    Lewis, W.S.

    1994-01-01

    This preliminary analysis examined the HA-21I glovebox and its supporting systems for potential process hazards. Upon further analysis, the thermal stabilization system has been installed in gloveboxes HC-21A and HC-21C. The use of HC-21C and HC-21A simplified the initial safety analysis. In addition, these gloveboxes were cleaner and required less modification for operation than glovebox HA-21I. While this document refers to glovebox HA-21I for the hazards analysis performed, glovebox HC-21C is sufficiently similar that the following analysis is also valid for HC-21C. This hazards analysis document is being re-released as revision 1 to include the updated flowsheet document (Appendix C) and the updated design basis (Appendix D). The revised Process Flow Schematic has also been included (Appendix E). This Current revision incorporates the recommendations provided from the original hazards analysis as well. The System Design Description (SDD) has also been appended (Appendix H) to document the bases for Safety Classification of thermal stabilization equipment

  2. Revision to DOE Order 450.1 [1] and How it affects DOE Sites

    International Nuclear Information System (INIS)

    Birchfield, J.W.

    2009-01-01

    On June 4, 2008, DOE finalized the latest technical revision of DOE Order 450.1A. The latest revision of the order contains many new EMS requirements that can have a dramatic effect on what and how activities are conducted at the various DOE sites. The latest revision of the order contains many new Environmental Management System (EMS) requirements that can have a dramatic effect on what and how activities are conducted at the various DOE sites. DOE Order 450.1 contains some major technical revisions that will directly affect each DOE site. The exact extent of the changes to the order will vary at each site depending on the status of EMS implementation utilizing the ISO 14001:2004 (2004 denotes the latest version in effect) Standard and Executive Order 13423. ISO 14001:2004 contains a total of 17 elements (i.e., requirements) that are required for EMS programs. Because the original DOE Order 450.1 did not require conformance to the original ISO 14001:1996 Standard, this is a significant addition to EMS program management. Some EMS program elements will require effort, some significant, depending upon the complexity of the operations conducted at the various DOE sites. Significant EMS elements added include audit programs (e.g., internal and external), operational controls (e.g., procedures, personnel and equipment), monitoring and measurement (e.g., key environmental metrics tracking and equipment calibration), document controls, communication and preventive actions. DOE has also drastically altered its approach to sustainable development and environmental stewardship by specifying departmental goals through: - Reduction or elimination of the toxicity of waste through pollution prevention; - Reduction or elimination of the acquisition, use and release of toxic/hazardous materials and chemicals; - Maximizing the purchase of environmental friendly chemicals and materials in the conduct of operations; - Reduction or elimination of environmental impacts from electronic

  3. 76 FR 39303 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Science.gov (United States)

    2011-07-06

    ...EPA is taking direct final action to approve revisions to the Imperial County Air Pollution Control District (ICAPCD), Kern County Air Pollution Control District (KCAPCD), and Ventura County Air Pollution Control District (VCAPCD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from architectural coating operations. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  4. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1987-05-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes

  5. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1993-01-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes

  6. Safety of Nuclear Power Plants: Commissioning and Operation

    International Nuclear Information System (INIS)

    2011-01-01

    This publication is a revision of Safety Requirements No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe operation of nuclear power plants. Over recent years there have been developments in areas such as long term operation, plant ageing, periodic safety review, probabilistic safety analysis and risk informed decision making processes. It became necessary to revise the IAEA's safety requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the Fundamental Safety Principles. Contents: 1. Introduction; 2. Safety objectives and principles; 3. The management and organizational structure of the operating organization; 4. Management of operational safety; 5. Operational safety programmes; 6. Plant commissioning; 7. Plant operations; 8. Maintenance, testing, surveillance and inspection; 9. Preparation for decommissioning.

  7. Towards Revised Step IV MICE Optics in the Absence of M1 SSD

    Energy Technology Data Exchange (ETDEWEB)

    Bayes, R. [Univ. of Glasgow, Scotland (United Kingdom); Berg, J. S. [Brookhaven National Lab. (BNL), Upton, NY (United States); Blackmore, V. [Imperial College, London (United Kingdom); Hunt, C. [Imperial College, London (United Kingdom); Liu, A. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Pasternak, J. [Imperial College, London (United Kingdom); Rogers, C. T. [Science and Technology Facilities Council (STFC), Oxford (United Kingdom). Rutherford Appleton Lab. (RAL)

    2015-10-01

    During magnet commissioning in September 2015, the leads on coil M1 of the downstream spectrometer solenoid failed. The coil will not be operational for MICE Step IV. Revised optics settings for the Step IV data taking are reviewed.

  8. Towards Revised Step IV MICE Optics in the Absence of M1 SSD

    International Nuclear Information System (INIS)

    Bayes, R.; Berg, J. S.; Blackmore, V.; Hunt, C.; Liu, A.; Pasternak, J.; Rogers, C. T.

    2015-01-01

    During magnet commissioning in September 2015, the leads on coil M1 of the downstream spectrometer solenoid failed. The coil will not be operational for MICE Step IV. Revised optics settings for the Step IV data taking are reviewed.

  9. Waste Management Program management plan. Revision 1

    International Nuclear Information System (INIS)

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management's objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL

  10. Guidance document for revision of DOE Order 5820.2A, Radioactive Waste Technical Support Program. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Kudera, D.E.; McMurtrey, C.D.; Meagher, B.G.

    1993-04-01

    This document provides guidance for the revision of DOE Order 5820.2A, ``Radioactive Waste Management.`` Technical Working Groups have been established and are responsible for writing the revised order. The Technical Working Groups will use this document as a reference for polices and procedures that have been established for the revision process. The overall intent of this guidance is to outline how the order will be revised and how the revision process will be managed. In addition, this document outlines technical issues considered for inclusion by a Department of Energy Steering Committee.

  11. Conversion total hip arthroplasty: Primary or revision total hip arthroplasty

    Science.gov (United States)

    Schwarzkopf, Ran; Baghoolizadeh, Mahta

    2015-01-01

    Total hip arthroplasty (THA) is an increasingly common procedure among elderly individuals. Although conversion THA is currently bundled in a diagnosis related group (DRG) with primary THA, there is a lack of literature supporting this classification and it has yet to be identified whether conversion THA better resembles primary or revision THA. This editorial analyzed the intraoperative and postoperative factors and functional outcomes following conversion THA, primary THA, and revision THA to understand whether the characteristics of conversion THA resemble one procedure or the other, or are possibly somewhere in between. The analysis revealed that conversion THA requires more resources both intraoperatively and postoperatively than primary THA. Furthermore, patients undergoing conversion THA present with poorer functional outcomes in the long run. Patients undergoing conversion THA better resemble revision THA patients than primary THA patients. As such, patients undergoing conversion THA should not be likened to patients undergoing primary THA when determining risk stratification and reimbursement rates. Conversion THA procedures should be planned accordingly with proper anticipation of the greater needs both in the operating room, and for in-patient and follow-up care. We suggest that conversion THA be reclassified in the same DRG with revision THA as opposed to primary THA as a step towards better allocation of healthcare resources for conversion hip arthroplasties. PMID:26601055

  12. BWR Water Chemistry Guidelines: 1993 Revision, Normal and hydrogen water chemistry

    International Nuclear Information System (INIS)

    Karlberg, G.; Goddard, C.; Fitzpatrick, S.

    1994-02-01

    The goal of water chemistry control is to extend the operating life of the reactor and rector coolant system, balance-of-plant components, and turbines while simultaneously controlling costs to safeguard the continued economic viability of the nuclear power generation investment. To further this goal an industry committee of chemistry personnel prepared guidelines to identify the benefits, risks, and costs associated with water chemistry in BWRs and to provide a template for an optimized water chemistry program. This document replaces the BWR Normal Water Chemistry Guidelines - 1986 Revision and the BWR Hydrogen Water Chemistry Guidelines -- 1987 Revision. It expands on the previous guidelines documents by covering the economic implications of BWR water chemistry control

  13. 76 FR 37021 - Louisiana: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2011-06-24

    ...: Final Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental... implement its base Hazardous Waste Management Program. We granted authorization for changes to their program... opportunity to apply for final authorization to operate all aspects of their hazardous waste management...

  14. [Revision of the drinking water regulations].

    Science.gov (United States)

    Hauswirth, S

    2011-11-01

    The revision the Drinking Water Regulations will come into effect on 01.11.2011. Surveillance authorities and owners of drinking water supply systems had hoped for simplifications and reductions because of the new arrangements. According to the official statement for the revision the legislature intended to create more clarity, consider new scientific findings, to change regulations that have not been proved to close regulatory gaps, to deregulate and to increase the high quality standards. A detailed examination of the regulation text, however, raises doubts. The new classification of water supply systems requires different modalities of registration, water analyses and official observation, which will complicate the work of the authorities. In particular, the implementation of requirements of registration and examination for the owners of commercial and publicly-operated large hot-water systems in accordance with DVGW Worksheet W 551 requires more effort. According to the estimated 30 000 cases of legionellosis in Germany the need for a check of such systems for Legionella, however, is not called into question. Furthermore, the development of sampling plans and the monitoring of mobile water supply systems requires more work for the health authorities. © Georg Thieme Verlag KG Stuttgart · New York.

  15. [Osteosynthesis and cup revision in periprosthetic acetabulum fractures using a Kocher-Langenbeck approach].

    Science.gov (United States)

    Schwabe, P; Märdian, S; Perka, C; Schaser, K-D

    2016-04-01

    Reconstruction/stable fixation of the acetabular columns to create an adequate periacetabular requirement for the implantation of a revision cup. Displaced/nondisplaced fractures with involvement of the posterior column. Resulting instability of the cup in an adequate bone stock situation. Periprosthetic acetabulum fractures with inadequate bone stock. Extended periacetabular defects with loss of anchorage options. Isolated periprosthetic fractures of the anterior column. Septic loosening. Dorsal approach. Dislocation of hip. Mechanical testing of inlaying acetabular cup. With unstable cup situation explantation of the cup, fracture fixation of acetabulum with dorsal double plate osteosynthesis along the posterior column. Cup revision. Hip joint reposition. Early mobilization; partial weight bearing for 12 weeks. Thrombosis prophylaxis. Clinical and radiological follow-ups. Periprosthetic acetabular fracture in 17 patients with 9 fractures after primary total hip replacement (THR), 8 after revision THR. Fractures: 12 due to trauma, 5 spontaneously; 7 anterior column fractures, 5 transverse fractures, 4 posterior column fractures, 1 two column fracture after hemiendoprosthesis. 5 type 1 fractures and 12 type 2 fractures. Operatively treated cases (10/17) received 3 reinforcement ring, 2 pedestal cup, 1 standard revision cup, cup-1 cage construct, 1 ventral plate osteosynthesis, 1 dorsal plate osteosynthesis, and 1 dorsal plate osteosynthesis plus cup revision (10-month Harris Hip Score 78 points). Radiological follow-up for 10 patients: consolidation of fractures without dislocation and a fixed acetabular cup. No revision surgeries during follow-up; 2 hip dislocations, 1 transient sciatic nerve palsy.

  16. Safety assessment for the 118-B-1 Burial Ground excavation treatability tests. Revision 2

    International Nuclear Information System (INIS)

    Zimmer, J.J.; Frain, J.M.

    1994-12-01

    This revision of the Safety Assessment provides an auditable safety analysis of the hazards for the proposed treatability test activities per DOE-EM-STD-5502-94, DOE Limited Standard, Hazard Baseline Documentation (DOE 1994). The proposed activities are classified as radiological activities and as such, no longer require Operational Safety Limits (OSLs). The OSLS, Prudent Actions, and Institutional and Organization Controls have been removed from this revision and replaced with ''Administrative Actions Important to Safety,'' as determined by the hazards analysis. Those Administrative Actions Important to Safety are summarized in Section 1.1, ''Assessment Summary.''

  17. Mixed Waste Management Facility, revised FY94 Plan

    International Nuclear Information System (INIS)

    Streit, R.

    1994-01-01

    This revision of the FY94 Plan incorporates changes to work during FY94 in response to the DOE request in the DOE KD-1 decision letter of June 28,1994. This letter provided guidance of both scope and budget profile in response to the Conceptual Design Report (CDR) issued by the MWMF Project in April, 1994. This work plan only addresses work for the remainder of FY94. A revised plan for the complete project is in development and will be issued separately. Since February, 1994, the MWMF Project has been operating on DOE guidance directing that work on the CDR be completed, that only other essential work be continued to maintain the project, and that costs be maintained at approximately the January, 1994 spending levels until a KD-1 decision was made. This has formed the basis for monthly reports through June, 1994. The baseline contained in this report will become the basis for reports during the remainder of FY94

  18. Deep Borehole Emplacement Mode Hazard Analysis Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Sevougian, S. David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-08-07

    This letter report outlines a methodology and provides resource information for the Deep Borehole Emplacement Mode Hazard Analysis (DBEMHA). The main purpose is identify the accident hazards and accident event sequences associated with the two emplacement mode options (wireline or drillstring), to outline a methodology for computing accident probabilities and frequencies, and to point to available databases on the nature and frequency of accidents typically associated with standard borehole drilling and nuclear handling operations. Risk mitigation and prevention measures, which have been incorporated into the two emplacement designs (see Cochran and Hardin 2015), are also discussed. A key intent of this report is to provide background information to brief subject matter experts involved in the Emplacement Mode Design Study. [Note: Revision 0 of this report is concentrated more on the wireline emplacement mode. It is expected that Revision 1 will contain further development of the preliminary fault and event trees for the drill string emplacement mode.

  19. Manpower development for safe operation of nuclear power plant. China. Revision of final safety analysis report. Activity: 5.1.3-Task-08. Technical report

    International Nuclear Information System (INIS)

    Almeida, C.; Elias, D.

    1994-01-01

    The objectives of this mission included providing assistance for the revision of the FSAR including: national practices, administrative procedures, required staffing level, other resources, planning, scheduling, content, and organization of the revision. Activities included several days of lectures regarding worldwide practices including the United States and Commonwealth Edison Company (ComEd), interaction with Chinese counterparts re. their FSAR and Technical Specification revision and two visits to the Qin Shan NPP

  20. Strategies for revision surgery after primary double-bundle anterior cruciate ligament (ACL) reconstruction

    NARCIS (Netherlands)

    Hofbauer, Marcus; Muller, Bart; Murawski, Christopher D.; Baraga, Michael; van Eck, Carola Franziska; Fu, Freddie H.

    2013-01-01

    The purpose of this article was to discuss pre- and intra-operative considerations as well as surgical strategies for different femoral and tibial tunnel scenarios in revision surgery following primary double-bundle anterior cruciate ligament (ACL) reconstruction. Based on the current literature of

  1. 78 FR 46781 - Federal Acquisition Regulation; Definition of Contingency Operation

    Science.gov (United States)

    2013-08-01

    ... Federal Acquisition Regulation; Definition of Contingency Operation AGENCY: Department of Defense (DoD... the Federal Acquisition Regulation (FAR) to revise the definition of ``contingency operation'' to... ``contingency operation'' at FAR 2.101 in accordance with the statutory change to the definition made by...

  2. Composition operators between Bloch type spaces and Zygmund ...

    Indian Academy of Sciences (India)

    MS received 1 September 2009; revised 31 March 2011. Abstract. The boundedness and compactness of composition operators between. Bloch type spaces and Zygmund spaces of holomorphic functions in the unit ball are characterized in the paper. Keywords. Composition operator; Bloch type space; Zygmund space. 1.

  3. Performance assessment for continuing and future operations at solid waste storage area 6

    International Nuclear Information System (INIS)

    1997-09-01

    This revised performance assessment (PA) for the continued disposal operations at Solid Waste Storage Area (SWSA) 6 on the Oak Ridge Reservation (ORR) has been prepared to demonstrate compliance with the performance objectives for low-level radioactive waste (LLW) disposal contained in the US Department of Energy (DOE) Order 5820.2A. This revised PA considers disposal operations conducted from September 26, 1988, through the projects lifetime of the disposal facility

  4. Performance assessment for continuing and future operations at solid waste storage area 6

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This revised performance assessment (PA) for the continued disposal operations at Solid Waste Storage Area (SWSA) 6 on the Oak Ridge Reservation (ORR) has been prepared to demonstrate compliance with the performance objectives for low-level radioactive waste (LLW) disposal contained in the US Department of Energy (DOE) Order 5820.2A. This revised PA considers disposal operations conducted from September 26, 1988, through the projects lifetime of the disposal facility.

  5. Revision of migrated pelvic acetabular components in THA with or without vascular involvement

    Directory of Open Access Journals (Sweden)

    Ștefan Cristea

    2016-05-01

    Full Text Available Purpose. The literature describes a high rate of mortality in cases of intrapelvic acetabular component migration, which is a rare but serious complication. Our aim is to establish and propose a treatment protocol according to our results and experience. Material and Methods. We performed eight (8 total hip revisions with acetabular cup migration between 2006 and 2012. A vascular graft was needed in four (4 of these cases. Two (2 cases were revisions after a spacer for infected arthroplasties. The protocol included the following: X-Ray examination (frontal and lateral views, CT angiography, a biological evaluation, a suitable pre-operative plan, at least six (6 units of blood stock, an experienced anesthesiologist, an experienced surgical team that included a vascular surgeon and a versatile arsenal of revision prostheses, bone grafts and vascular grafts. The anterolateral approach was generally used for hip revisions and the retroperitoneal approach in the dorsal decubitus position was used when vascular risk was involved. Results: The acetabular defect was reconstructed using bone grafts and tantalum revision cups in 4 cases, Burch-Schneider cages in 2 cases, a Kerboull ring in 1 case and a cementless oblong cup (Cotyle Espace in 1 case. In 4 cases, an iliac vessel graft procedure was conducted by the vascular surgeon. All patients survived the revision procedures and returned regularly for subsequent check-ups, during which they did not show any septic complications. Conclusions: Intrapelvic acetabular cup migration is a rare but serious complication that can occur after total hip arthroplasty in either septic or aseptic cases. An experienced, multidisciplinary team of surgeons should be involved in planning and conducting such complicated revisions.

  6. WRAP TRUPACT loading systems operational test report

    International Nuclear Information System (INIS)

    DOSRAMOS, E.V.

    1999-01-01

    This Operational Test Report documents the operational testing of the TRUPACT process equipment HNF-3918, Revision 0, TRUPACT Operational Test Procedure. The test accomplished the following: Procedure validation; Facility equipment interface; Facility personnel support; and Subcontractor personnel support interface. Field changes are documented as test exceptions with resolutions. All resolutions are completed or a formal method is identified to track the resolution through to completion

  7. 77 FR 26475 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-05-04

    ...EPA is proposing to approve revisions to the Antelope Valley Air Quality Management District (AVAQMD), Eastern Kern Air Pollution Control District (EKAPCD), and Santa Barbara County Air Pollution Control District (SBCAPCD) portions of the California State Implementation Plan (SIP). We are proposing to approve revisions to local rules that define terms used in other air pollution regulations in these areas and a rule rescission that address Petroleum Coke Calcining Operations--Oxides of Sulfur, under the Clean Air Act as amended in 1990 (CAA or the Act).

  8. 76 FR 60376 - Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control...

    Science.gov (United States)

    2011-09-29

    ...EPA is taking direct final action to approve revisions to the Santa Barbara Air Pollution Control District (SBAPCD), Sacramento Municipal Air Quality Management District (SMAQMD) and South Coast Air Quality Management District (SCAQMD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from solvent cleaning machines and solvent cleaning operations and oil and gas production wells. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  9. 76 FR 60405 - Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control...

    Science.gov (United States)

    2011-09-29

    ...EPA is proposing to approve revisions to the Santa Barbara Air Pollution Control District (SBAPCD), Sacramento Municipal Air Quality Management District (SMAQMD) and South Coast Air Quality Management District (SCAQMD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from solvent cleaning machines and solvent cleaning operations and oil and gas production wells. We are proposing to approve local rules to regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  10. Waste Management Program management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

  11. 48 CFR 15.307 - Proposal revisions.

    Science.gov (United States)

    2010-10-01

    ... AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Source Selection 15.307 Proposal revisions. (a) If an... allow proposal revisions to clarify and document understandings reached during negotiations. At the... submit a final proposal revision. The contracting officer is required to establish a common cut-off date...

  12. Revision of the Paris and Brussels Conventions of Nuclear Liability

    International Nuclear Information System (INIS)

    Reyners, P.

    2002-01-01

    The Contracting Parties to the 1960 Paris Convention on Third Party Liability in the Field of Nuclear Energy and to the 1963 Brussels Convention Supplementary to the Paris Convention, have concluded this Spring four years of negotiation on the revision of these instruments. This exercise was itself started as a logical consequence of the adoption in 1997 of a revised Vienna Convention on Civil Liability for Nuclear Damage and of a Convention on Supplementary Compensation for Nuclear Damage. The Contracting Parties have concluded that the existing regime established by these Conventions remains viable and sound but that it also warrants improvements to ensure that greater financial security will be available to compensate a potentially larger number of victims in respect of a broader range of nuclear damage. A number of more technical amendments have also been agreed, in particular to ensure compatibility with other existing Conventions in this field. When the revised Paris and Brussels Conventions come into force, the total amount of funds available for compensation, provided by the liable nuclear operator and by the States concerned, will be 1.5 billion euros. (author)

  13. Upgraded safety analysis document including operations policies, operational safety limits and policy changes. Revision 2

    International Nuclear Information System (INIS)

    Batchelor, K.

    1996-03-01

    The National Synchrotron Light Source Safety Analysis Reports (1), (2), (3), BNL reports number-sign 51584, number-sign 52205 and number-sign 52205 (addendum) describe the basic Environmental Safety and Health issues associated with the department's operations. They include the operating envelope for the Storage Rings and also the rest of the facility. These documents contain the operational limits as perceived prior or during construction of the facility, much of which still are appropriate for current operations. However, as the machine has matured, the experimental program has grown in size, requiring more supervision in that area. Also, machine studies have either verified or modified knowledge of beam loss modes and/or radiation loss patterns around the facility. This document is written to allow for these changes in procedure or standards resulting from their current mode of operation and shall be used in conjunction with the above reports. These changes have been reviewed by NSLS and BNL ES and H committee and approved by BNL management

  14. 7 CFR 3015.115 - Budget revisions.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Budget revisions. 3015.115 Section 3015.115..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Programmatic Changes and Budget Revisions § 3015.115 Budget revisions. (a) Nonconstruction projects. (1) Except as provided in paragraph (a)(2) of...

  15. A study on scar revision

    Directory of Open Access Journals (Sweden)

    Ashutosh Talwar

    2016-04-01

    Full Text Available Introduction: Scars are psychologically distressing for the patients and have an impact on the quality of life and self esteem of the patients. Scar revision is an aesthetic skill which is mastered by plastic surgeons and encroached now by dermatosurgeons. Scars on the face are aesthetically unacceptable and various techniques have been improvised for making a scar aesthetically acceptable. Various types of techniques are used for scar revision like W plasty, Z plasty and VY plasty. Aims: To see the efficacy of various scar revision techniques including Z plasty, VY plasty and W plasty in 30 patients with disfiguring scars. Methods: We selected twenty patients of disfiguring scars for the study. The scars from various causes including trauma and burns were included in our study. Various techniques of scar revision include Z plasty, W plasty and VY plasty were performed according to the type and site of scar. Results: Male: female was 1.5: 1. The scar revision surgery yielded excellent results with minimal complications including haematoma formation, secondary infection and delayed healing seen in 5% patients each. Regarding the efficacy of scar revision, excellent improvement was seen in 60% patients, moderate improvement was seen in 30% patients and mild improvement was seen in 10% patients. Conclusions: Dermatologists can employ a number of surgical scar revision techniques. While some are better suited to treat specific types of scars, they can be used in combination with each other or with adjunctive therapies to achieve optimal results.

  16. Recent developments in the IAEA safety standards: design and operation of nuclear power plants

    International Nuclear Information System (INIS)

    Saito, Takehiko

    2004-01-01

    The IAEA has been publishing a wide variety of safety standards for nuclear and radiation related facilities and activities since 1978. In 1996, a more rigorously structured approach for the preparation and review of its safety standards was introduced. Currently, based on the approach, revision of most of the standards is in completion or near completion. The latest versions of the Safety Requirements for ''Design'' and ''Operation'' of nuclear power plants were respectively published in 2000. Currently, along with this revision of the Safety Requirements, many Safety Guides have been revised. In order to clarify the complicated revision procedure, an example of the entire revision process for a Safety Guide is provided. Through actual example of the revision process, enormous amount of work involved in the revision work is clearly indicated. The current status of all of the Safety Standards for Design and that for Operation of nuclear power plants are summarized. Summary of other IAEA safety standards currently revised and available related IAEA publications, together with information on the IAEA Web Site from where these documents can be downloaded, is also provided. The standards are reviewed to determine whether revision (or new issue) is necessary in five years following publication. The IAEA safety standards will continue to be updated through comprehensive and structured approach, collaboration of many experts of the world, and reflecting good practices of the world. The IAEA safety standards will serve to provide high level of safety assurance. (author)

  17. 78 FR 13765 - Federal Acquisition Regulation; Definition of Contingency Operation

    Science.gov (United States)

    2013-02-28

    ... Federal Acquisition Regulation; Definition of Contingency Operation AGENCY: Department of Defense (DoD... Regulation (FAR) to revise the definition of ``contingency operation'' to address the statutory change to the... ``contingency operation'' at FAR 2.101 in accordance with the statutory change to the definition made by...

  18. 200 Area Treated Effluent Disposal Facility operational test specification. Revision 2

    International Nuclear Information System (INIS)

    Crane, A.F.

    1995-01-01

    This document identifies the test specification and test requirements for the 200 Area Treated Effluent Disposal Facility (200 Area TEDF) operational testing activities. These operational testing activities, when completed, demonstrate the functional, operational and design requirements of the 200 Area TEDF have been met. The technical requirements for operational testing of the 200 Area TEDF are defined by the test requirements presented in Appendix A. These test requirements demonstrate the following: pump station No.1 and associated support equipment operate both automatically and manually; pump station No. 2 and associated support equipment operate both automatically and manually; water is transported through the collection and transfer lines to the disposal ponds with no detectable leakage; the disposal ponds accept flow from the transfer lines with all support equipment operating as designed; and the control systems operate and status the 200 Area TEDF including monitoring of appropriate generator discharge parameters

  19. 77 FR 37359 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2012-06-21

    ...EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) and the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portions of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from chipping and grinding activities, and composting operations. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act). We are taking comments on this proposal and plan to follow with a final action.

  20. Revision of the design model for a cryogenic falling liquid film helium separator

    International Nuclear Information System (INIS)

    Kinoshita, Masahiro; Bartlit, J.R.; Sherman, R.H.

    1983-05-01

    The present paper reports revision of the design model previously developed by the authors for the cryogenic falling liquid film helium separator. The revised design procedure is composed of three steps : 1) calculation of distributions of phase flow rates, temperature and phase compositions within the refrigerated section and the packed section ; 2) calculation of more detailed distributions of these variables within the refrigerated section ; and 3) estimation of column dimensions and determination of operating conditions. It is assumed that the vacant refrigerated section has two theoretical stages for hydrogen isotope separation. The mixture within the refrigerated section is considered in step 2) as two component system of He-HD. (author)

  1. Regulations for the Safe Transport of Radioactive Materials. 1964 Revised Edition

    International Nuclear Information System (INIS)

    1965-01-01

    In 1961 the International Atomic Energy Agency, within the framework of its statutory functions and in accordance with recommendations made by its Preparatory Commission and by the Economic and Social Council of the United Nations, published safety regulations which could be applied to the national and international transport of radio active materials by all means of transport. At the same time, the Director General of the Agency indicated that these regulations would be revised at appropriate intervals in consultation with Member States and the organizations concerned and invited suggestions for their improvement in the light of experience and increased knowledge. In preparing the revised regulations presented in this document, the Agency has received considerable support from its Member States and the organizations concerned, which have made extensive studies and suggestions in order to assist in its work. The Agency also convened several meetings of experts from its Member States and of representatives of a number of international organizations, and has been represented in several meetings convened by those organizations. In publishing the revised transport regulations which result from that co-ordinated effort, the Agency aims at proposing a lasting framework of principles and rules, complemented by appropriate technical data, acceptable for the safe transport of radio active materials by air, land and water. In particular, the developments which have been introduced concerning the packaging requirements, the nuclear safety criteria for the transport of fissile materials and the methods for testing packages should facilitate the international acceptance of packages by the authorities concerned. The Board of Governors of the Agency approved the revised regulations in June and September 1964. It authorized the Director General to apply them, as appropriate, to Agency operations and Agency assisted operations and to recommend to Member States and to the

  2. Assessing the effectiveness of quality management for nuclear power plant operation

    International Nuclear Information System (INIS)

    1991-06-01

    The development of a methodology for assessing the effectiveness of quality management for nuclear power plant operation has been under way by the IAEA for some time. The preparation of this document was based on understandings developed at a series of advisory group and consultant meetings which used the experience accumulated at operating plants in Member States. The information collected from the use of this document will help to prepare a revision as soon as the proposed methodology, or a revised methodology, can be agreed as generally appropriate by Member States. 16 refs, figs

  3. Modular to Monoblock: Difficulties of Detaching the M(2)a-Magnum(TM) Head Are Common in Metal-on-metal Revisions.

    Science.gov (United States)

    Mäntymäki, Heikki; Mäkelä, Keijo T; Vahlberg, Tero; Hirviniemi, Joni; Niinimäki, Tuukka

    2016-09-01

    Modern hip implants typically feature modular heads, which allow for easy exchange and removal from the femoral stem at the time of revision. However, owing to fretting, corrosion, or cold welding, the modular head may be difficult or impossible to separate from the underlying trunnion, especially if the implant has titanium interfaces between the head and the stem. We have repeatedly encountered difficulty removing the titanium sleeve adapter in the M(2)a-Magnum(TM) implant. Although the manufacturer warns about this complication and cases with these difficulties have been reported to the United States FDA, we believed this topic is important to study, because the frequency of difficulties in head removal is unknown and the complications related to this event have not been characterized. We asked: (1) Do revisions of M(2)a-Magnum(TM) implants differ from those of M(2)a-38(TM) implants in terms of ease of removal of the femoral head? (2) In cases where difficulty with M(2)a-Magnum(TM) head removal occurred, was the operative time, bleeding, risk of periprosthetic fracture, or joint infection increased compared with cases where the M(2)a-Magnum(TM) head was removed without difficulties? Between 2004 and 2014, we revised 296 THAs with metal-on-metal implants that involved M(2)a-Magnum(TM) (123) or M(2)a-38(TM) heads (88); of those, 84 were planned to include a femoral stem revision and insufficient data were available for three operations, so they were excluded from this analysis, leaving 124 THAs in the current retrospective study (70 THAs with M(2)a-Magnum(TM) and 54 THAs with M(2)a-38(TM) heads).The method of modular head removal, any difficulties removing the femoral head from the trunnion, operation time, and complications were recorded based on chart review. All the observed problems of detaching the head or taper adapter were among M(2)a-Magnum(TM) heads; there were no problems detaching the head in revisions of the M(2)a-38(TM) implant. In 29% (20 of 70) of

  4. 75 FR 81187 - South Dakota: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2010-12-27

    ...: Final Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed Rule. SUMMARY: The Solid Waste Disposal Act, as amended, commonly... Agency (EPA) to authorize states to operate their hazardous waste management programs in lieu of the...

  5. Cochlear implant revision surgeries in children.

    Science.gov (United States)

    Amaral, Maria Stella Arantes do; Reis, Ana Cláudia Mirândola B; Massuda, Eduardo T; Hyppolito, Miguel Angelo

    2018-02-16

    The surgery during which the cochlear implant internal device is implanted is not entirely free of risks and may produce problems that will require revision surgeries. To verify the indications for cochlear implantation revision surgery for the cochlear implant internal device, its effectiveness and its correlation with certain variables related to language and hearing. A retrospective study of patients under 18 years submitted to cochlear implant Surgery from 2004 to 2015 in a public hospital in Brazil. Data collected were: age at the time of implantation, gender, etiology of the hearing loss, audiological and oral language characteristics of each patient before and after Cochlear Implant surgery and any need for surgical revision and the reason for it. Two hundred and sixty-five surgeries were performed in 236 patients. Eight patients received a bilateral cochlear implant and 10 patients required revision surgery. Thirty-two surgeries were necessary for these 10 children (1 bilateral cochlear implant), of which 21 were revision surgeries. In 2 children, cochlear implant removal was necessary, without reimplantation, one with cochlear malformation due to incomplete partition type I and another due to trauma. With respect to the cause for revision surgery, of the 8 children who were successfully reimplanted, four had cochlear calcification following meningitis, one followed trauma, one exhibited a facial nerve malformation, one experienced a failure of the cochlear implant internal device and one revision surgery was necessary because the electrode was twisted. The incidence of the cochlear implant revision surgery was 4.23%. The period following the revision surgeries revealed an improvement in the subject's hearing and language performance, indicating that these surgeries are valid in most cases. Copyright © 2018 Associação Brasileira de Otorrinolaringologia e Cirurgia Cérvico-Facial. Published by Elsevier Editora Ltda. All rights reserved.

  6. Operational readiness of EFAD systems

    International Nuclear Information System (INIS)

    Kabat, M.J.

    1992-02-01

    An assessment of the operational readiness of the Emergency Filtered Air Discharge (EFAD) systems, installed in Canadian CANDU multi-unit nuclear power plants, was performed in this project. Relevant Canadian and foreign standards and regulatory requirements have been reviewed and documentation on EFAD system design, operation, testing and maintenance have been assessed to identify likely causes and potential failures of EFAD systems and their components under both standby and accident conditions. Recommendations have also been provided in this report for revisions which are needed to achieve and maintain appropriate operational readiness of EFAD systems

  7. Application of geographic information system for radiologic emergency response

    International Nuclear Information System (INIS)

    Best, R.G.; Doyle, J.F.; Mueller, P.G.

    1998-01-01

    Comprehensive and timely radiological, cultural, and environmental data are required in order to make informed decisions during a radiological emergency. Within the Federal Radiological Monitoring and Assessment Center (FRMAC), there is a continuing effort to improve the data management and communication process. The most recent addition to this essential function has been the development of the Field Analysis System for Emergency Response (FASER). It is an integrated system with compatible digital image processing and Geographic Information System (GIS) capabilities. FASER is configured with commercially available off-the-shelf hardware and software components. To demonstrate the potential of the FASER system for radiological emergency response, the system has been utilized in interagency FRMAC exercises to analyze the available spatial data to help determine the impact of a hypothetical radiological release and to develop mitigation plans. (R.P.)

  8. 24 CFR 968.225 - Budget revisions.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Budget revisions. 968.225 Section... Fewer Than 250 Units) § 968.225 Budget revisions. (a) A PHA shall not incur any modernization cost in excess of the total HUD-approved CIAP budget. A PHA shall submit a budget revision, in a form prescribed...

  9. Monitored Geologic Repository Concept of Operations

    International Nuclear Information System (INIS)

    Curry, P.M.

    1999-01-01

    This updated document provides the top level guidance for development of the individual systems for the MGR which will be further developed in the System Description Documents. This document will serve as guidance for the development of functional interface and operational requirements. However, the data and engineering values presented in Monitored Geologic Repository Concept of Operations are provided as estimates or summaries of the current design. The original analyses or supporting documents must be utilized if the data or engineering values are used for design inputs. The concepts presented will be utilized as inputs for the development of operational concepts for the individual systems. It is recognized that the references listed may contain existing data or data which are to be verified. However, the data and engineering values presented will not impact the concepts presented in this technical document. As such, the data and engineering values are not being tracked as To Be Verified data. This revision was created to incorporate changes resulting from Enhanced Design Alternative II and Revision 3, DCN 01, of the Monitored Geologic Repository Requirements (YMP 1999)

  10. Computer Program of SIE ASME-NH (Revision 1.0) Code

    Energy Technology Data Exchange (ETDEWEB)

    Koo, Gyeong Hoi; Lee, J. H

    2008-01-15

    In this report, the SIE ASME (Structural Integrity Evaluations by ASME-NH) (Revision 1.0), which has a computerized implementation of ASME Pressure Vessels and Piping Code Section III Subsection NH rules, is developed to apply to the next generation reactor design subjecting to the elevated temperature operations over 500 .deg. C and over 30 years design lifetime, and the user's manual for this program is described in detail.

  11. Computer Program of SIE ASME-NH (Revision 1.0) Code

    International Nuclear Information System (INIS)

    Koo, Gyeong Hoi; Lee, J. H.

    2008-01-01

    In this report, the SIE ASME (Structural Integrity Evaluations by ASME-NH) (Revision 1.0), which has a computerized implementation of ASME Pressure Vessels and Piping Code Section III Subsection NH rules, is developed to apply to the next generation reactor design subjecting to the elevated temperature operations over 500 .deg. C and over 30 years design lifetime, and the user's manual for this program is described in detail

  12. Preoperative diagnostic for periprosthetic joint infection prior to total knee revision arthroplasty

    Directory of Open Access Journals (Sweden)

    Leif Claassen

    2014-08-01

    Full Text Available Periprosthetic joint infection (PJI after total knee arthroplasty remains a challenging problem. The aim of this study was to evaluate the accuracy of diagnostic knee aspiration and serum inflammatory markers in diagnostic of a PJI after total knee arthroplasty. Within 2011 and 2012, 46 patients received a one- or two-stage revision arthroplasty of the knee joint. These patients received a total number of 77 operations. A preoperative aspiration was performed in each case. We analyzed the microbiological and histological examinations of the samples from the aspiration and from the revision operation and additionally estimated serum inflammatory markers. The diagnostic aspiration had a specificity of 0.87, a sensitivity of 0.39, a positive predictive value of 0.67 and a negative predictive value of 0.68. For C-reactive protein the specificity was 0.61 and the sensitivity was 0.48, the serum white blood cell count had a specificity of 0.98 and a sensitivity of 0.23. Our data queries whether diagnostic joint aspiration or serum inflammatory markers are sufficient to verify or exclude a PJI.

  13. A non-linear dynamical approach to belief revision in cognitive behavioral therapy

    Science.gov (United States)

    Kronemyer, David; Bystritsky, Alexander

    2014-01-01

    Belief revision is the key change mechanism underlying the psychological intervention known as cognitive behavioral therapy (CBT). It both motivates and reinforces new behavior. In this review we analyze and apply a novel approach to this process based on AGM theory of belief revision, named after its proponents, Carlos Alchourrón, Peter Gärdenfors and David Makinson. AGM is a set-theoretical model. We reconceptualize it as describing a non-linear, dynamical system that occurs within a semantic space, which can be represented as a phase plane comprising all of the brain's attentional, cognitive, affective and physiological resources. Triggering events, such as anxiety-producing or depressing situations in the real world, or their imaginal equivalents, mobilize these assets so they converge on an equilibrium point. A preference function then evaluates and integrates evidentiary data associated with individual beliefs, selecting some of them and comprising them into a belief set, which is a metastable state. Belief sets evolve in time from one metastable state to another. In the phase space, this evolution creates a heteroclinic channel. AGM regulates this process and characterizes the outcome at each equilibrium point. Its objective is to define the necessary and sufficient conditions for belief revision by simultaneously minimizing the set of new beliefs that have to be adopted, and the set of old beliefs that have to be discarded or reformulated. Using AGM, belief revision can be modeled using three (and only three) fundamental syntactical operations performed on belief sets, which are expansion; revision; and contraction. Expansion is like adding a new belief without changing any old ones. Revision is like adding a new belief and changing old, inconsistent ones. Contraction is like changing an old belief without adding any new ones. We provide operationalized examples of this process in action. PMID:24860491

  14. Addenbrooke's Cognitive Examination-Revised for mild cognitive impairment in Parkinson's disease.

    Science.gov (United States)

    McColgan, Peter; Evans, Jonathan R; Breen, David P; Mason, Sarah L; Barker, Roger A; Williams-Gray, Caroline H

    2012-08-01

    Cognitive impairment is common in Parkinson's disease (PD), even in the early stages, and appropriate screening tools are needed. We investigated the utility of the Addenbrooke's Cognitive Examination-Revised for detecting mild cognitive impairment (MCI) in PD in an incident population-representative cohort (n = 132) and investigated the relationship between performance on this instrument and behavior and quality of life (n = 219). Twenty-two percent met criteria for MCI. Receiver operating curve analysis revealed an area under the curve of 0.81. A cutoff Cognitive Rating Scale, and there were significant correlations with the Cambridge Behavioral Inventory-Revised and Parkinson's Disease Questionnaire 39. This instrument is a useful screening tool for PD-MCI, and poor performance is significantly related to impaired behavior and quality of life. Copyright © 2012 Movement Disorder Society.

  15. Safety of Nuclear Power Plants: Commissioning and Operation (Spanish Edition)

    International Nuclear Information System (INIS)

    2012-01-01

    This publication is a revision of Safety Requirements No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe operation of nuclear power plants. Over recent years there have been developments in areas such as long term operation, plant ageing, periodic safety review, probabilistic safety analysis and risk informed decision making processes. It became necessary to revise the IAEA's safety requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the Fundamental Safety Principles. Contents: 1. Introduction; 2. Safety objectives and principles; 3. The management and organizational structure of the operating organization; 4. Management of operational safety; 5. Operational safety programmes; 6. Plant commissioning; 7. Plant operations; 8. Maintenance, testing, surveillance and inspection; 9. Preparation for decommissioning.

  16. Safety of Nuclear Power Plants: Commissioning and Operation (French Edition)

    International Nuclear Information System (INIS)

    2012-01-01

    This publication is a revision of Safety Requirements No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe operation of nuclear power plants. Over recent years there have been developments in areas such as long term operation, plant ageing, periodic safety review, probabilistic safety analysis and risk informed decision making processes. It became necessary to revise the IAEA's safety requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the Fundamental Safety Principles. Contents: 1. Introduction; 2. Safety objectives and principles; 3. The management and organizational structure of the operating organization; 4. Management of operational safety; 5. Operational safety programmes; 6. Plant commissioning; 7. Plant operations; 8. Maintenance, testing, surveillance and inspection; 9. Preparation for decommissioning.

  17. Safety of Nuclear Power Plants: Commissioning and Operation. Arabic Edition

    International Nuclear Information System (INIS)

    2011-01-01

    This publication is a revision of Safety Requirements No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe operation of nuclear power plants. Over recent years there have been developments in areas such as long term operation, plant ageing, periodic safety review, probabilistic safety analysis and risk informed decision making processes. It became necessary to revise the IAEA's safety requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the Fundamental Safety Principles. Contents: 1. Introduction; 2. Safety objectives and principles; 3. The management and organizational structure of the operating organization; 4. Management of operational safety; 5. Operational safety programmes; 6. Plant commissioning; 7. Plant operations; 8. Maintenance, testing, surveillance and inspection; 9. Preparation for decommissioning.

  18. Environmental dosimetry for normal operations at SRP. Revision 1

    International Nuclear Information System (INIS)

    Marter, W.L.

    1984-01-01

    The radiological effect of environmental releases from SRP during normal operations has been assessed annually since 1972 with a dosimetry model developed by SRL in 1971 to 1972, as implemented in the MREM code for atmospheric releases and RIVDOSE code for liquid releases. Starting in 1978, SRL started using environmental models and dose commitment factors developed by Nuclear Regulatory Commission (NRC) for all other environmental dose calculations. The NRC models are more flexible than the older SRL models, use more up-to-date methodologies, cover more exposure pathways, and permit more detailed analysis of effects of normal operations. It is recommended that the NRC models, as implemented in the computer codes X0QD0Q and GASPAR for atmospheric releases and LADTAP for liquid releases, and NRC dose commitment factors be used as the standard method at SRP for assessing offsite dose from normal operations in Health Protection Department annual environmental monitoring reports, and in National Environmental Policy Act documents and Safety Analysis Reports for SRP facilities. 23 references, 3 figures, 9 tables

  19. Project W-320, operational test procedure OTP-320-003 test report

    International Nuclear Information System (INIS)

    Bevins, R.R.

    1998-01-01

    This report documents and summarizes the results of OTP-320-003 Project W-320 Operational Testing of the WRSS Supernate Transfer System. Project W-320 Operational Test OTP-320-003 was performed to verify components of the Waste Retrieval Sluicing System (WRSS) supernate transfer system functioned as designed following construction completion and turnover to operations. All equipment operation was performed by Tank Farms Operations personnel following the operational test procedure and referenced operating procedures. Supernate Transfer line Flushing System Testing was completed over the course of approximately 4 weeks as tank farm conditions and configuration, equipment availability, and operations resources allowed. All testing was performed with the 702-AZ ventilation system and the 296-P-16 ventilation systems in operation. Test procedure OTP-320-003 required two revisions during testing to incorporate Procedure Changes Authorizations (PCAs) necessary to facilitate testing. Various sections of testing are documented on each procedure revision. The completed test procedure is included as Attachment A. Exception Reports generated during the course of testing are included as Attachment B

  20. 78 FR 26300 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions to Control of Air...

    Science.gov (United States)

    2013-05-06

    .... First, we are proposing to approve revisions to Texas SIP, Chapter 117 emissions specifications for lean... curing ovens used in wet-laid non-woven fiber mat manufacturing operations when nitrogen containing...

  1. Revised National Pressure Ulcer Advisory Panel Pressure Injury Staging System: Revised Pressure Injury Staging System.

    Science.gov (United States)

    Edsberg, Laura E; Black, Joyce M; Goldberg, Margaret; McNichol, Laurie; Moore, Lynn; Sieggreen, Mary

    Our understanding of pressure injury etiology and development has grown in recent years through research, clinical expertise, and global interdisciplinary expert collaboration. Therefore, the National Pressure Ulcer Advisory Panel (NPUAP) has revised the definition and stages of pressure injury. The revision was undertaken to incorporate the current understanding of the etiology of pressure injuries, as well as to clarify the anatomical features present or absent in each stage of injury. An NPUAP-appointed Task Force reviewed the literature and created drafts of definitions, which were then reviewed by stakeholders and the public, including clinicians, educators, and researchers around the world. Using a consensus-building methodology, these revised definitions were the focus of a multidisciplinary consensus conference held in April 2016. As a result of stakeholder and public input, along with the consensus conference, important changes were made and incorporated into the new staging definitions. The revised staging system uses the term injury instead of ulcer and denotes stages using Arabic numerals rather than Roman numerals. The revised definition of a pressure injury now describes the injuries as usually occurring over a bony prominence or under a medical or other device. The revised definition of a Stage 2 pressure injury seeks to clarify the difference between moisture-associated skin damage and injury caused by pressure and/or shear. The term suspected has been removed from the Deep Tissue Pressure Injury diagnostic label. Each definition now describes the extent of tissue loss present and the anatomical features that may or may not be present in the stage of injury. These important revisions reflect the methodical and collaborative approach used to examine the available evidence and incorporate current interdisciplinary clinical expertise into better defining the important phenomenon of pressure injury etiology and development.

  2. Microcomputers and the Improvement of Revision Skills.

    Science.gov (United States)

    Balajthy, Ernest; And Others

    1987-01-01

    Discusses use of word processing software as an effective tool in writing and revision instruction, and describes the role of the teacher. Examples of exercises that encourage revision and of software designed to teach effective revision skills are reviewed. (MBR)

  3. Individual questions of financial control and revision

    Directory of Open Access Journals (Sweden)

    В. М. Глібко

    2015-05-01

    Full Text Available Problem setting. In modern conditions at investigation and gathering of proofs in criminal proceedings according to item 93 CPC of Ukraine collecting of proofs which is carried out by the criminal proceedings parties, victim is important, the representative of the legal person, in which relation carries out manufacture, including a way истребования and receptions from public authorities, local governments, the enterprises, establishments and organisations, official and physical persons of things, documents, data, conclusions of experts, conclusions of revisions and certificates of checks. Recent research and publications analisis. In scientific sources questions of carrying out of revisions S. B.Zhivko, V.V.Akimov, G.Demjanchuk, J.Buzdugan is considered. Paper objective. Article purpose is studying and definition of a place of revision among forms of inspection of the state control and use of results of revision in criminal proceedings. Paper main body. Off-schedule exit revision that is revision which is not provided in plans of work of body of the state financial control is considered and is spent at presence at least one of the circumstances listed in item 11 of the Law of Ukraine «About main principles of realisation of the state financial control in Ukraine». If revision is carried out on request of investigating bodies it is spent on the basis of the petition of the inspector and accepted by the results of consideration of this petition of the decision of the investigatory judge. The primary goal of revision on request of investigating bodies or on the basis of court definition is reception of proofs on business. Therefore the revision certificate admits the written proof as on the basis of its conclusion of the inspector, the public prosecutor receives the information on a perfect crime, abusing, and also on the persons who have committed a crime, on the period of commission of crime and an amount of damage. In criminal

  4. Operator training and requalification at GPU Nuclear

    International Nuclear Information System (INIS)

    Long, R.L.; Barrett, R.J.; Newton, S.L.

    1982-01-01

    The operator training and requalification programs at GPU Nuclear's Oyster Creek (650 MWe BWR) and Three Mile Island-1 (776 MWe PWR) nuclear plants have undergone significant revisions since the Three Mile Island-2 accident. This paper describes the Training and Education organization, the expanded training facilities, including basic principle trainers and replica simulators, and the present operator training and requalification programs

  5. Expedited technology demonstration project (Revised mixed waste management facility project) Project baseline revision 4.0 and FY98 plan

    International Nuclear Information System (INIS)

    Adamson, M. G.

    1997-01-01

    The re-baseline of the Expedited Technology Demonstration Project (Revised Mixed Waste Facility Project) is designated as Project Baseline Revision 4.0. The last approved baseline was identified as Project Baseline Revision 3.0 and was issued in October 1996. Project Baseline Revision 4.0 does not depart from the formal DOE guidance followed by, and contained in, Revision 3.0. This revised baseline document describes the MSO and Final Forms testing activities that will occur during FY98, the final year of the ETD Project. The cost estimate for work during FY98 continues to be $2.OM as published in Revision 3.0. However, the funds will be all CENRTC rather than the OPEX/CENTRC split previously anticipated. LLNL has waived overhead charges on ETD Project CENRTC funds since the beginning of project activities. By requesting the $2.OM as all CENTRC a more aggressive approach to staffing and testing can be taken. Due to a cost under- run condition during FY97 procurements were made and work was accomplished, with the knowledge of DOE, in the Feed Preparation and Final Forms areas that were not in the scope of Revision 3.0. Feed preparation activities for FY98 have been expanded to include the drum opening station/enclosure previously deleted

  6. 75 FR 2796 - Revisions to the California State Implementation Plan, San Joaquin Valley Air Pollution Control...

    Science.gov (United States)

    2010-01-19

    ...EPA is finalizing approval of revisions to the San Joaquin Valley Air Pollution Control District portion of the California State Implementation Plan (SIP). These revisions were proposed in the Federal Register on June 16, 2009 and concern volatile organic compound (VOC) emissions from coating of metal parts, large appliances, metal furniture, motor vehicles, mobile equipment, cans, coils, organic solvent cleaning, and storage and disposal related to such operations. We are approving local rules that regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or the Act).

  7. Development of the EU Ecolabel Criteria and Revision of the EU Green Public Procurement Criteria for Cleaning Services

    OpenAIRE

    DE ALMEIDA FERREIRA NETO BELMIRA; WOLF Oliver; FIELD Bethany; JENKIN Nicola; TAM Max; BENJAMIN Oscar

    2016-01-01

    The objective of this project is to develop a new EU Ecolabel and revise the existing EU Green Public Procurement (GPP) criteria for professional cleaning services (hereafter referred to as cleaning services). This preliminary report investigates the market, operational and sustainability aspects of cleaning services, with a goal to develop a robust evidence base and prioritise key environmental and social issues to support the development of EU Ecolabel criteria and the revision of the EU GP...

  8. Modern operating systems

    CERN Document Server

    Tanenbaum, Andrew S

    2015-01-01

    Modern Operating Systems, Fourth Edition, is intended for introductory courses in Operating Systems in Computer Science, Computer Engineering, and Electrical Engineering programs. It also serves as a useful reference for OS professionals ' The widely anticipated revision of this worldwide best-seller incorporates the latest developments in operating systems (OS) technologies. The Fourth Edition includes up-to-date materials on relevant'OS. Tanenbaum also provides information on current research based on his experience as an operating systems researcher. ' Modern Operating Systems, Third Editionwas the recipient of the 2010 McGuffey Longevity Award. The McGuffey Longevity Award recognizes textbooks whose excellence has been demonstrated over time.'http://taaonline.net/index.html " Teaching and Learning Experience This program will provide a better teaching and learning experience-for you and your students. It will help: ' *Provide Practical Detail on the Big Picture Concepts: A clear and entertaining writing s...

  9. Circumcision revision in male children

    Directory of Open Access Journals (Sweden)

    Mohammed A. Al-Ghazo

    2006-08-01

    Full Text Available OBJECTIVE: To determine indications for circumcision revision and to identify the specialty of the person who performed unsatisfactory primary circumcision. MATERIALS AND METHODS: The authors reviewed medical records of 52 cases that underwent circumcision revision over a 6-year period (1998 to 2004. Sleeve surgical technique was used for revision in patients with redundant foreskin or concealed penis, penoplasty for partial or complete degloving of the penis and meatotomy for external meatal stenosis. The mean age of children was 32 months (range 6 months to 9 years. RESULTS: Most of unsatisfactory primary circumcisions (86.7% were performed by laymen. All patients who underwent circumcision revision had good to excellent cosmetic results. CONCLUSION: Primary circumcision performed by laymen carry a high complication rate and serious complications may occur. A period of training and direct supervision by physicians is required before allowing laymen to perform circumcision independently.

  10. The economic impact of revision otologic surgery.

    Science.gov (United States)

    Nadimi, Sahar; Leonetti, John P; Pontikis, George

    2016-03-01

    Revision otologic surgery places a significant economic burden on patients and the healthcare system. We conducted a retrospective chart analysis to estimate the economic impact of revision canal-wall-down (CWD) mastoidectomy. We reviewed the medical records of all 189 adults who had undergone CWD mastoidectomy performed by the senior author between June 2006 and August 2011 at Loyola University Medical Center in Maywood, Ill. Institutional charges and collections for all patients were extrapolated to estimate the overall healthcare cost of revision surgery in Illinois and at the national level. Of the 189 CWD mastoidectomies, 89 were primary and 100 were revision procedures. The total charge for the revision cases was $2,783,700, and the net reimbursement (collections) was $846,289 (30.4%). Using Illinois Hospital Association data, we estimated that reimbursement for 387 revision CWD mastoidectomies that had been performed in fiscal year 2011 was nearly $3.3 million. By extrapolating our data to the national level, we estimated that 9,214 patients underwent revision CWD mastoidectomy in the United States during 2011, which cost the national healthcare system roughly $76 million, not including lost wages and productivity. Known causes of failed CWD mastoidectomies that often result in revision surgery include an inadequate meatoplasty, a facial ridge that is too high, residual diseased air cells, and recurrent cholesteatoma. A better understanding of these factors can reduce the need for revision surgery, which could have a positive impact on the economic strain related to this procedure at the local, state, and national levels.

  11. How to Revise, and Revise Really Well, for Premier Academic Journals

    DEFF Research Database (Denmark)

    LaPlaca, Peter J.; Lindgreen, Adam; Vanhamme, Joelle

    2018-01-01

    Most of the premier academic journals in all fields routinely have rejection rates of 80%, 95%, or higher. All journals prefer articles that make significant contributions to the field. Revising a manuscript and responding properly to the comments of reviewers and editors often is challenging....... This article discusses how to revise effectively a manuscript according to the (minor or major) comments of reviewers and editors for premier academic journals. We provide a series of tips for helping the authors in their endeavor, making the process less arduous and improving the possibility of a positive...

  12. A taxonomic revision of the genus Podocarpus

    NARCIS (Netherlands)

    Laubenfels, de D.J.

    1985-01-01

    In connection with the forthcoming revision of the Coniferae for the Flora Malesiana, the author thought it necessary to revise the genus Podocarpus. Although this genus has a substantial representation in Malesia (30 species), the revision is too involved to be appropriate with the Flora Malesiana

  13. Nevada Test Site Radiological Control Manual. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2010-02-09

    This document supersedes DOE/NV/25946--801, “Nevada Test Site Radiological Control Manual,” Revision 0 issued in October 2009. Brief Description of Revision: A minor revision to correct oversights made during revision to incorporate the 10 CFR 835 Update; and for use as a reference document for Tenant Organization Radiological Protection Programs.

  14. 76 FR 68811 - Notice of Request for the Revision of Currently Approved Information Collection

    Science.gov (United States)

    2011-11-07

    ... operating information from the nation's public transportation systems. Congress created the NTD to be the... request the Office of Management and Budget (OMB) to approve the revision of the currently approved information collection: 49 U.S.C. 5335(a) and (b) National Transit Database (NTD). DATES: Comments must be...

  15. Children's high-level writing skills: development of planning and revising and their contribution to writing quality.

    Science.gov (United States)

    Limpo, Teresa; Alves, Rui A; Fidalgo, Raquel

    2014-06-01

    It is well established that the activity of producing a text is a complex one involving three main cognitive processes: Planning, translating, and revising. Although these processes are crucial in skilled writing, beginning and developing writers seem to struggle with them, mainly with planning and revising. To trace the development of the high-level writing processes of planning and revising, from Grades 4 to 9, and to examine whether these skills predict writing quality in younger and older students (Grades 4-6 vs. 7-9), after controlling for gender, school achievement, age, handwriting fluency, spelling, and text structure. Participants were 381 students from Grades 4 to 9 (age 9-15). Students were asked to plan and write a story and to revise another story by detecting and correcting mechanical and substantive errors. From Grades 4 to 9, we found a growing trend in students' ability to plan and revise despite the observed decreases and stationary periods from Grades 4 to 5 and 6 to 7. Moreover, whereas younger students' planning and revising skills made no contribution to the quality of their writing, in older students, these high-level skills contributed to writing quality above and beyond control predictors. The findings of this study seem to indicate that besides the increase in planning and revising, these skills are not fully operational in school-age children. Indeed, given the contribution of these high-level skills to older students' writing, supplementary instruction and practice should be provided from early on. © 2013 The British Psychological Society.

  16. Continuously revised assurance cases with stakeholders’ cross-validation: a DEOS experience

    Directory of Open Access Journals (Sweden)

    Kimio Kuramitsu

    2016-12-01

    Full Text Available Recently, assurance cases have received much attention in the field of software-based computer systems and IT services. However, software changes very often, and there are no strong regulations for software. These facts are two main challenges to be addressed in the development of software assurance cases. We propose a method of developing assurance cases by means of continuous revision at every stage of the system life cycle, including in operation and service recovery in failure cases. Instead of a regulator, dependability arguments are validated by multiple stakeholders competing with each other. This paper reported our experience with the proposed method in the case of Aspen education service. The case study demonstrates that continuous revisions enable stakeholders to share dependability problems across software life cycle stages, which will lead to the long-term improvement of service dependability.

  17. 78 FR 9016 - Approval and Promulgation of Air Quality Implementation Plans; Massachusetts; Revisions to Fossil...

    Science.gov (United States)

    2013-02-07

    ... efficiency. This will improve boiler operation and reduce overall emissions. The emission decrease will more... Source Registration Regulations and Boiler Industrial Standards AGENCY: Environmental Protection Agency... standards for new boilers. The intended effect of this action is to propose approval of the state's revised...

  18. Rate of shunt revision as a function of age in patients with shunted hydrocephalus due to myelomeningocele.

    Science.gov (United States)

    Dupepe, Esther B; Hopson, Betsy; Johnston, James M; Rozzelle, Curtis J; Jerry Oakes, W; Blount, Jeffrey P; Rocque, Brandon G

    2016-11-01

    OBJECTIVE It is generally accepted that cerebrospinal fluid shunts fail most frequently in the first years of life. The purpose of this study was to describe the risk of shunt failure for a given patient age in a well-defined cohort with shunted hydrocephalus due to myelomeningocele (MMC). METHODS The authors analyzed data from their institutional spina bifida research database including all patients with MMC and shunted hydrocephalus. For the entire population, the number of shunt revisions in each year of life was determined. Then the number of patients at risk for shunt revision during each year of life was calculated, thus enabling them to calculate the rate of shunt revision per patient in each year of life. In this way, the timing of all shunt revision operations for the entire clinic population and the likelihood of having a shunt revision during each year of life were calculated. RESULTS A total of 655 patients were enrolled in the spina bifida research database, 519 of whom had a diagnosis of MMC and whose mean age was 17.48 ± 11.7 years (median 16 years, range 0-63 years). Four hundred seventeen patients had had a CSF shunt for the treatment of hydrocephalus and thus are included in this analysis. There were 94 shunt revisions in the 1st year of life, which represents a rate of 0.23 revisions per patient in that year. The rate of shunt revision per patient-year initially decreased as age increased, except for an increase in revision frequency in the early teen years. Shunt revisions continued to occur as late as 43 years of age. CONCLUSIONS These data substantiate the idea that shunt revision surgeries in patients with MMC are most common in the 1st year of life and decrease thereafter, except for an increase in the early teen years. A persistent risk of shunt failure was observed well into adult life. These findings underscore the importance of routine follow-up of all MMC patients with shunted hydrocephalus and will aid in counseling patients and

  19. Radiation protection planning and management during revision

    International Nuclear Information System (INIS)

    Gewehr, K.

    1984-01-01

    During the operation of nuclear power plants it is normally possible for the in-house personnel to take care of arising radiation protection problems. However, in the comparatively short revision phases, the duties of radiation protection become much more varied. Additional trained radiation protection crews are needed at short notice. This is also the time in which the largest contributions are made to the annual cumulated doses of the personnel. Recent guidelines and rules trying to reduce the radiation exposure of personnel concentrate on this very point. The article outlines the radiation protection activities performed by the service personnel in the course of a steam generator check. (orig.) [de

  20. [An overview on the collation and revision of medical books by the Bureau for Revising Medical Books in the Northern Song Dynasty].

    Science.gov (United States)

    Meng, Yongliang; Liang, Yongxuan

    2014-07-01

    The Bureau for Revising Medical Books was a temporary agency established by the government of the Northern Song Dynasty in 1057, the 2nd year of Jiayou of Emperor Renzong, exclusively for the edition, revision and publishing of ancient medical books. 11 medical books were revised and edited by 13 Bureau members in a period of 12 years until 1069, the 2nd year of Xining of Emperor ShenZong, which eventually became the final versions until today. 8 medical books were initially planned for the revision, but 11 were actually completed in the end. The time for completing a revision varied from over 10 years at most to less than 1 year at least. Instead of working in the office, the officers of the Bureau for Revising Medical Books did their works at home. The members of the said Bureau came from the Tiju officer of the Bureau for Revising Medical Books and the officials of revising medical books, consisting of both Confucian ministers and medical officers. Confucian ministers played an important role in revising medical books. The Bureau had a strict workflow in electing revising officials, making the project, and the determination of the principles and arrangements of the tasks of editing and proofreading.

  1. Stem cell engineered bone with calcium-phosphate coated porous titanium scaffold or silicon hydroxyapatite granules for revision total joint arthroplasty.

    Science.gov (United States)

    García-Gareta, Elena; Hua, Jia; Rayan, Faizal; Blunn, Gordon W

    2014-06-01

    Aseptic loosening in total joint replacements (TJRs) is mainly caused by osteolysis which leads to a reduction of the bone stock necessary for implant fixation in revision TJRs. Our aim was to develop bone tissue-engineered constructs based on scaffolds of clinical relevance in revision TJRs to reconstitute the bone stock at revision operations by using a perfusion bioreactor system (PBRS). The hypothesis was that a PBRS will enhance mesenchymal stem cells (MSCs) proliferation and osteogenic differentiation and will provide an even distribution of MSCs throughout the scaffolds when compared to static cultures. A PBRS was designed and implemented. Scaffolds, silicon substituted hydroxyapatite granules and calcium-phosphate coated porous TiAl6V4 cylinders, were seeded with MSCs and cultured either in static conditions or in the PBRS at 0.75 mL/min. Statistically significant increased cell proliferation and alkaline phosphatase activity was found in samples cultured in the PBRS. Histology revealed a more even cell distribution in the perfused constructs. SEM showed that cells arranged in sheets. Long cytoplasmic processes attached the cells to the scaffolds. We conclude that a novel tissue engineering approach to address the issue of poor bone stock at revision operations is feasible by using a PBRS.

  2. Emotion Processes in Knowledge Revision

    Science.gov (United States)

    Trevors, Gregory J.; Kendeou, Panayiota; Butterfuss, Reese

    2017-01-01

    In recent years, a number of insights have been gained into the cognitive processes that explain how individuals overcome misconceptions and revise their previously acquired incorrect knowledge. The current study complements this line of research by investigating the moment-by-moment emotion processes that occur during knowledge revision using a…

  3. 75 FR 57597 - Revised Proposal for Revisions to the Schedules of Civil Penalties for a Violation of a Federal...

    Science.gov (United States)

    2010-09-21

    ... Revisions to the Schedules of Civil Penalties for a Violation of a Federal Railroad Safety Law or Federal... railroad safety laws and regulations are necessary because many of FRA's civil penalties have not been..., et al. Revised Proposal for Revisions to the Schedules of Civil Penalties for a Violation of a...

  4. 75 FR 14097 - Revision to Electric Reliability Organization Definition of Bulk Electric System

    Science.gov (United States)

    2010-03-24

    ... electrical failure of a 138 kV motor operated switch on a 138 kV-13 kV transformer located in the ReliabilityFirst region resulted in the tripping of two transformers, one due to the electrical failure and the... Commission 18 CFR Part 40 [Docket No. RM09-18-000; 130 FERC ] 61,204] Revision to Electric Reliability...

  5. The association between metal allergy, total hip arthroplasty, and revision

    DEFF Research Database (Denmark)

    Thyssen, Jacob Pontoppidan; Jakobsen, Stig Storgaard; Engkilde, Kåre

    2009-01-01

    BACKGROUND AND PURPOSE: It has been speculated that the prevalence of metal allergy may be higher in patients with implant failure. We compared the prevalence and cause of revisions following total hip arthroplasty (THA) in dermatitis patients suspected to have contact allergy and in patients...... in general with THA. Furthermore, we compared the prevalence of metal allergy in dermatitis patients with and without THA. MATERIALS AND METHODS: The Danish Hip Arthroplasty Registry (DHAR) contained detailed information on 90,697 operations. The Gentofte patch-test database contained test results...... was similar in cases (12%) and in patients from the DHAR (13%). The prevalence of metal allergy was similar in cases and controls. However, the prevalence of metal allergy was lower in cases who were patch-tested after operation (6%) than in those who were patch-tested before operation (16%) (OR = 2.9; 95% CI...

  6. Student-initiated revision in child health.

    Science.gov (United States)

    Alfaham, M; Gray, O P; Davies, D P

    1994-03-01

    Most teaching of child health in Cardiff takes place in block attachments of 8 weeks. There is an introductory seminar of 2 days followed by a 6-week clinical attachment in a district general hospital in Wales, and then a revision period of one week designed to help students formalize and structure their basic knowledge and to clarify aspects of child health which they may have had difficulty in understanding. The revision programme has to take into account: the short time available, the small number of teaching staff, the most relevant basic knowledge and active participation by the student. This paper describes how this week has been improved through the use of student-initiated revision (SIR). The students' appraisal of this revision and in particular SIR is presented.

  7. Nevada Test Site Radiological Control Manual, Revision 1

    International Nuclear Information System (INIS)

    2010-01-01

    This document supersedes DOE/NV/25946--801, 'Nevada Test Site Radiological Control Manual,' Revision 0 issued in October 2009. Brief Description of Revision: A minor revision to correct oversights made during revision to incorporate the 10 CFR 835 Update; and for use as a reference document for Tenant Organization Radiological Protection Programs. This manual contains the radiological control requirements to be used for all radiological activities conducted by programs under the purview of the U.S. Department of Energy (DOE) and the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). Compliance with these requirements will ensure compliance with Title 10 Code of Federal Regulations (CFR) Part 835, 'Occupational Radiation Protection.' Programs covered by this manual are located at the Nevada Test Site (NTS); Nellis Air Force Base and North Las Vegas, Nevada; Santa Barbara and Livermore, California; and Andrews Air Force Base, Maryland. In addition, fieldwork by NNSA/NSO at other locations is covered by this manual. The NTS is located in Nye County, Nevada. The NTS is located approximately 105 kilometers (65 miles) northwest of Las Vegas. It is a remote facility that covers approximately 3,500 square kilometers (1,375 square miles) of land. The dimensions of the NTS vary from 46 to 56 kilometers (28 to 35 miles) in width (eastern to western border) and from 64 to 88 kilometers (40 to 55 miles) in length (northern to southern border). The NTS is surrounded to the west, north, and east by additional thousands of acres of land withdrawn from the public domain for use as a protected wildlife range and as a military gunnery range. These public exclusion areas comprise the Nellis Air Force Range complex, previously designated as the Nellis Air Force Base Bombing and Gunnery Range, and the Tonopah Test Range. These two areas provide a buffer zone between the test areas and public lands administered by the Federal Bureau of Land

  8. Nuclear safety guide. TID-7016, Revision 2

    International Nuclear Information System (INIS)

    Thomas, J.T.

    1978-01-01

    The Nuclear Safety Guide was first issued in 1956 as classified AEC report LA-2063 and was reprinted the next year, unclassified, as TID-7016. Revision 1, published in 1961, extended the scope and refined the guiding information. The present revision of the Guide differs significantly from its predecessor in that the latter was intentionally conservative in its recommendations. Firmly based on experimental evidence of criticality, the original Guide and the first revision were considered to be of most value to organizations whose activities with fissionable materials were not extensive and, secondarily, that it would serve as a point of departure for members of established nuclear safety teams, experienced in the field. The reader will find a significant change in the character of information presented in this version. Nuclear Criticality Safety has matured in the past twelve years. The advance of calculational capability has permitted validated calculations to extend and substitute for experimental data. The broadened data base has enabled better interpolation, extension, and understanding of available information, especially in areas previously addressed by undefined but adequate factors of safety. The content has been thereby enriched in qualitative guidance. The information inherently contains, and the user can recapture, the quantitative guidance characteristic of the formerGuides by employing appropriate safety factors. In fact, it becomes incumbent on the Criticality Safety Specialist to necessarily impose safety factors consistent with the possible normal and abnormal credible contingencies of an operation as revealed by his evaluation. In its present form the Guide easily becomes a suitable module in any compendium or handbook tailored for internal use by organizations. It is hoped the Guide will continue to serve immediate needs and will encourage continuing and more comprehensive efforts toward organizing nuclear criticality safety information

  9. Nuclear safety guide. TID-7016, Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, J T [ed.

    1978-05-01

    The Nuclear Safety Guide was first issued in 1956 as classified AEC report LA-2063 and was reprinted the next year, unclassified, as TID-7016. Revision 1, published in 1961, extended the scope and refined the guiding information. The present revision of the Guide differs significantly from its predecessor in that the latter was intentionally conservative in its recommendations. Firmly based on experimental evidence of criticality, the original Guide and the first revision were considered to be of most value to organizations whose activities with fissionable materials were not extensive and, secondarily, that it would serve as a point of departure for members of established nuclear safety teams, experienced in the field. The reader will find a significant change in the character of information presented in this version. Nuclear Criticality Safety has matured in the past twelve years. The advance of calculational capability has permitted validated calculations to extend and substitute for experimental data. The broadened data base has enabled better interpolation, extension, and understanding of available information, especially in areas previously addressed by undefined but adequate factors of safety. The content has been thereby enriched in qualitative guidance. The information inherently contains, and the user can recapture, the quantitative guidance characteristic of the formerGuides by employing appropriate safety factors. In fact, it becomes incumbent on the Criticality Safety Specialist to necessarily impose safety factors consistent with the possible normal and abnormal credible contingencies of an operation as revealed by his evaluation. In its present form the Guide easily becomes a suitable module in any compendium or handbook tailored for internal use by organizations. It is hoped the Guide will continue to serve immediate needs and will encourage continuing and more comprehensive efforts toward organizing nuclear criticality safety information.

  10. Polarized proton target-III. Operations manual, revision B

    International Nuclear Information System (INIS)

    Hill, D.; Moretti, A.; Onesto, F.; Rynes, P.

    1978-01-01

    The manual presented contains certain standard operating procedures for the vacuum, cryogenic, and electronic systems of PPT-III. In total, these systems comprise the following major divisions: (1) the target cryostat; (2) the 4 He pumping system; (3) the 3 He pumping system; (4) the remote monitors and controls; (5) the microwave system; (6) the magnet and power supply; (7) the computerized polarization monitor; (8) the 4 He liquefier and gas recovery system; and (9) miscellaneous auxiliary equipment

  11. Clinical and Economic Burden of Revision Knee Arthroplasty

    Directory of Open Access Journals (Sweden)

    Mohit Bhandari

    2012-01-01

    Full Text Available Surgery is indicated for symptomatic knee osteoarthritis (OA when conservative measures are unsuccessful. High tibial osteotomy (HTO, unicompartmental knee arthroplasty (UKA, and total knee arthroplasty (TKA are surgical options intended to relieve knee OA pain and dysfunction. The choice of surgical intervention is dependent on several factors such as disease location, patient age, comorbidities, and activity levels. Regardless of surgical treatment, complications such as infection, loosening or lysis, periprosthetic fracture, and postoperative pain are known risks and are indications for revision surgery. The clinical and economic implications for revision surgery are underappreciated. Over 55,000 revision surgeries were performed in 2010 in the US, with 48% of these revisions in patients under 65 years. Total costs associated with each revision TKA surgery have been estimated to be in excess of $49,000. The current annual economic burden of revision knee OA surgery is $2.7 billion for hospital charges alone. By 2030, assuming a 5-fold increase in the number of revision procedures, this economic burden will exceed $13 billion annually. It is appealing to envision a therapy that could delay or obviate the need for arthroplasty. From an actuarial standpoint, this would have the theoretical downstream effect of substantially reducing the number of revision procedures. Although no known therapies currently meet these criteria, such a breakthrough would have a tremendous impact in lessening the clinical and economic burden of knee OA revision surgery.

  12. Humeral windows in revision total elbow arthroplasty.

    Science.gov (United States)

    Peach, Chris A; Salama, Amir; Stanley, David

    2016-04-01

    The use of cortical windows for revision elbow arthroplasty has not previously been widely reported. Their use aids safe revision of a well fixed humeral prosthesis and can be used in the setting of dislocation, periprosthetic fracture or aseptic loosening of the ulnar component. We describe our technique and results of cortical windows in the distal humerus for revision elbow arthroplasty surgery.

  13. Outcomes of cup revision for ilio-psoas impingement after total hip arthroplasty: Retrospective study of 46 patients.

    Science.gov (United States)

    Batailler, C; Bonin, N; M Wettstein; Nogier, A; Martres, S; Ollier, E; May, O; Lustig, S

    2017-12-01

    Impingement of the ilio-psoas tendon on the acetabular component is a cause of pain after total hip arthroplasty (THA). Studies of cup revision for ilio-psoas impingement (IPI) are scarce and limited in size. We therefore conducted a large multicentre retrospective study with the following objectives: to assess the effectiveness of cup replacement in resolving the impingement syndrome, to determine the frequency and nature of complications after cup revision for IPI, and to identify pre-operative factors associated with good outcomes of cup revision for IPI. Cup revision is effective in resolving the pain due to IPI in selected patients. This retrospective multicentre study included 46 patients who underwent cup revision because of IPI. Before the revision, 38 (83%) patients had prominence of the anterior cup rim (mean, 9.9±4.5mm (range, 2-22mm) by radiography and 35 (76%) had cup malposition (anteversion50°). Mean follow-up was 21months (range, 6months to 6 years) and no patient was lost to follow-up. Outcomes at last follow-up were assessed based on the Oxford Hip Score (OHS), patient satisfaction index, complications, and revisions. At last follow-up, 39 (85%) patients were satisfied with the revision procedure, a significant improvement versus baseline was noted in the OHS (mean, 43±6; range, 25-48; P<0.001), and 41 patients were free of pain during hip flexion (P<0.001 versus baseline). Complications occurred in 3 (6.5%) patients, but only one complication was severe (deep infection). Recurrent groin pain was reported by 4 (8.7%) patients at last follow-up. None of the factors studied predicted the outcome of revision surgery. Cup revision for IPI after THA is effective in relieving the groin pain in 80% of patients with anterior cup rim prominence and/or cup malposition. However, complications can occur. Tenotomy may be preferable when the diagnosis is in doubt and/or cup position is acceptable. IV, retrospective observational study. Published by Elsevier

  14. Diet History Questionnaire: Database Revision History

    Science.gov (United States)

    The following details all additions and revisions made to the DHQ nutrient and food database. This revision history is provided as a reference for investigators who may have performed analyses with a previous release of the database.

  15. Revision surgery for failed thermal capsulorrhaphy.

    Science.gov (United States)

    Park, Hyung Bin; Yokota, Atsushi; Gill, Harpreet S; El Rassi, George; McFarland, Edward G

    2005-09-01

    With the failure of thermal capsulorrhaphy for shoulder instability, there have been concerns with capsular thinning and capsular necrosis affecting revision surgery. To report the findings at revision surgery for failed thermal capsulorrhaphy and to evaluate the technical effects on subsequent revision capsular plication. Case series; Level of evidence, 4. Fourteen patients underwent arthroscopic evaluation and open reconstruction for a failed thermal capsulorrhaphy. The cause of the failure, the quality of the capsule, and the ability to suture the capsule were recorded. The patients were evaluated at follow-up for failure, which was defined as recurrent subluxations or dislocations. The origin of the instability was traumatic (n = 6) or atraumatic (n = 8). At revision surgery in the traumatic group, 4 patients sustained failure of the Bankart repair with capsular laxity, and the others experienced capsular laxity alone. In the atraumatic group, all patients experienced capsular laxity as the cause of failure. Of the 14 patients, the capsule quality was judged to be thin in 5 patients and ablated in 1 patient. A glenoid-based capsular shift could be accomplished in all 14 patients. At follow-up (mean, 35.4 months; range, 22 to 48 months), 1 patient underwent revision surgery and 1 patient had a subluxation, resulting in a failure rate of 14%. Recurrent capsular laxity after failed thermal capsular shrinkage is common and frequently associated with capsular thinning. In most instances, the capsule quality does not appear to technically affect the revision procedure.

  16. Network Operations Support Plan for the Spot 2 mission (revision 1)

    Science.gov (United States)

    Werbitzky, Victor

    1989-01-01

    The purpose of this Network Operations Support Plan (NOSP) is to indicate operational procedures and ground equipment configurations for the SPOT 2 mission. The provisions in this document take precedence over procedures or configurations in other documents.

  17. Introductory Business Textbook Revision Cycles: Are They Getting Shorter?

    Science.gov (United States)

    Zinser, Brian; Brunswick, Gary

    2010-01-01

    The rate of textbook revision cycles is examined in light of the recent trend towards more rapid revisions (and adoptions of textbooks). The authors conduct background research to better understand the context for textbook revision cycles and the environmental forces that have been influencing what appears to be more rapid textbook revisions. A…

  18. Revision Vaginoplasty: A Comparison of Surgical Outcomes of Laparoscopic Intestinal versus Perineal Full-Thickness Skin Graft Vaginoplasty.

    Science.gov (United States)

    Van der Sluis, Wouter B; Bouman, Mark-Bram; Buncamper, Marlon E; Mullender, Margriet G; Meijerink, Wilhelmus J

    2016-10-01

    Vaginal (re)construction can greatly improve the quality of life of indicated patients. If primary vaginoplasty fails, multiple surgical approaches exist for revision. The authors compared surgical results of laparoscopic intestinal versus full-thickness skin graft revision vaginoplasty. A retrospective chart review of patients who underwent revision vaginoplasty at the authors' institution was conducted. Patient demographics, surgical characteristics, complications, hospitalization, reoperations, and neovaginal depth for both surgical techniques were recorded and compared. The authors studied a consecutive series of 50 transgender and three biological women who underwent revision vaginoplasty, of which 21 were laparoscopic intestinal and 32 were perineal full-thickness skin graft vaginoplasties, with a median clinical follow-up of 3.2 years (range, 0.5 to 19.7 years). Patient demographics did not differ significantly. There was no mortality. Two intraoperative rectal perforations (10 percent) occurred in the intestinal group versus six (19 percent) in the full-thickness skin graft group. Operative time was shorter for the full-thickness skin graft vaginoplasty group (131 ± 35 minutes versus 191 ± 45 minutes; p skin graft (81 percent) vaginoplasty procedures. A deeper neovagina was achieved with intestinal vaginoplasty (15.9 ± 1.4 cm versus 12.5 ± 2.8 cm; p skin graft vaginoplasty can be used as secondary vaginal reconstruction. Intraoperative and postoperative complications do not differ significantly, but rectal perforation was more prevalent in the full-thickness skin graft vaginoplasty group. Although the operative time of laparoscopic intestinal vaginoplasty is longer, adequate neovaginal depth was more frequently achieved than in secondary perineal full-thickness skin graft vaginoplasty. Therapeutic, III.

  19. Revised Rules for Concrete Bridges

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle; Jensen, F. M.; Middleton, C.

    This paper is based on research performed for the Highway Agency, London, UK under the project DPU/9/44 "Revision of Bridge Assessment Rules Based on Whole Life Performance: Concrete Bridges" It contains details of a methodology which can be used to generate Whole Life (WL) reliability profiles....... These WL reliability profiles may be used to establish revised rules for Concrete Bridges....

  20. Recurrent instability after revision anterior shoulder stabilization surgery.

    Science.gov (United States)

    Friedman, Lisa Genevra Mandeville; Griesser, Michael J; Miniaci, Anthony A; Jones, Morgan H

    2014-03-01

    The purpose of this study was to perform a systematic review of the literature to compare outcomes of revision anterior stabilization surgeries based on technique. This study also sought to compare the impact of bone defects on outcomes. A systematic review of the electronic databases PubMed, Cochrane Central Register of Controlled Trials, and Scopus was performed in July 2012 and March 2013. Of 345 articles identified in the search, 17 studies with Level I to IV Evidence satisfied the inclusion criteria and were analyzed according to PRISMA (Preferred Reporting Items for Systematic Reviews and Meta-Analyses) guidelines. Recurrent instability was defined as redislocation, resubluxation, or a positive apprehensive test after revision surgery. Procedures were categorized as arthroscopic Bankart repair, open Bankart repair, Bristow-Latarjet procedure, and other open procedures. In total, 388 shoulders were studied. Male patients comprised 74.1% of patients, 66.7% of cases involved the dominant shoulder, the mean age was 28.2 years, and the mean follow-up period was 44.2 months. The surgical procedures classified as "other open procedures" had the highest rate of recurrent instability (42.7%), followed by arthroscopic Bankart repair (14.7%), the Bristow-Latarjet procedure (14.3%), and open Bankart repair (5.5%). Inconsistent reporting of bone defects precluded drawing significant conclusions. A number of different procedures are used to address recurrent instability after a primary operation for anterior shoulder instability has failed. There is significant variability in the rate of recurrent instability after revision anterior shoulder stabilization surgery. Level IV, systematic review of Level I to IV studies. Copyright © 2014 Arthroscopy Association of North America. Published by Elsevier Inc. All rights reserved.

  1. Inferential revision in narrative texts: An ERP study.

    Science.gov (United States)

    Pérez, Ana; Cain, Kate; Castellanos, María C; Bajo, Teresa

    2015-11-01

    We evaluated the process of inferential revision during text comprehension in adults. Participants with high or low working memory read short texts, in which the introduction supported two plausible concepts (e.g., 'guitar/violin'), although one was more probable ('guitar'). There were three possible continuations: a neutral sentence, which did not refer back to either concept; a no-revise sentence, which referred to a general property consistent with either concept (e.g., '…beautiful curved body'); and a revise sentence, which referred to a property that was consistent with only the less likely concept (e.g., '…matching bow'). Readers took longer to read the sentence in the revise condition, indicating that they were able to evaluate their comprehension and detect a mismatch. In a final sentence, a target noun referred to the alternative concept supported in the revise condition (e.g., 'violin'). ERPs indicated that both working memory groups were able to evaluate their comprehension of the text (P3a), but only high working memory readers were able to revise their initial incorrect interpretation (P3b) and integrate the new information (N400) when reading the revise sentence. Low working memory readers had difficulties inhibiting the no-longer-relevant interpretation and thus failed to revise their situation model, and they experienced problems integrating semantically related information into an accurate memory representation.

  2. Programme for the Environmental Control at the Swedish Nuclear Facilities, Revision; Omgivningskontrollprogram foer de kaerntekniska anlaeggningarna, revision

    Energy Technology Data Exchange (ETDEWEB)

    Linden, Ann-Marie

    2004-12-01

    This report contains a revised version of the Environmental Monitoring Programme for the Swedish Nuclear Facilities. The revision is based on earlier experiences and evaluations. Some samples have been excluded. Some have been added, for example spruce cone and the food products apple and currant. The sediment samples of 2 cm length have been completed with samples of 10 cm length every fourth year to follow the migration of radio nuclides down the sediment layers over time. The revised Environmental Monitoring Programme is valid from the 1st of January 2005.

  3. 75 FR 34670 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Revision to Emission...

    Science.gov (United States)

    2010-06-18

    ... http://www.regulations.gov or e-mail. The http://www.regulations.gov Web site is an ``anonymous access... On December 15, 2009, the Maryland Department of the Environment (MDE) submitted a revision to the... through 2004, and that MDE review the operations of the facility, then adopt regulations to establish an...

  4. 78 FR 56742 - Revision of Approved Information Collection (Paperwork) Requirements for Office of Management and...

    Science.gov (United States)

    2013-09-13

    ... the causes and prevention of occupational injuries, illnesses, and accidents (29 U.S.C. 657). The OSH... construction. Accordingly, construction businesses with workers who operate or work in the vicinity of cranes... in construction work subject to 29 CFR part 1926 subpart V. OSHA revised the exemption in existing 29...

  5. Local public document room directory. Revision 7

    International Nuclear Information System (INIS)

    1998-04-01

    This directory (NUREG/BR-0088, Revision 7) lists local public document rooms (LPDRs) for commercial nuclear power plants with operating or possession-only licenses or under construction, plus the LPDRs for potential high-level radioactive waste repository sites, gaseous diffusion plants, certain fuel cycle facilities, certain low-level waste disposal facilities, and any temporary LPDRs established for the duration of licensing proceedings. In some instances, the LPDR libraries maintain document collections for more than one licensed facility. The library staff members listed are the persons most familiar with the LPDR collections. Reference librarians in the NRC Headquarters Public Document Room (PDR) are also available to assist the public in locating NRC documents

  6. Revising Nabokov Revising”

    Directory of Open Access Journals (Sweden)

    Marie Bouchet

    2010-10-01

    Full Text Available Nabokov revised his works as he translated them and, on another plane, canon revisionism has been having its backlash and provoked other refracting waves. The purpose of the conference was to advance Nabokov studies through the discussion of how our view of Nabokov’s standing and his works today should be revised, especially after the publication of The Original of Laura. However the conference was not confined to just this theme, since “revising” is a word rich with implications. To borrow s...

  7. Fatigue failure of the cephalomedullary nail: revision options, outcomes and review of the literature.

    Science.gov (United States)

    Tucker, Adam; Warnock, Michael; McDonald, Sinead; Cusick, Laurence; Foster, Andrew P

    2018-04-01

    Cephalomedullary nail (CMN) failure is a rare entity following hip fracture treatment. However, it poses significant challenges for revision surgery, both mechanically and biologically. Nail failure rates have been reported at failure, compared to "adequate" and "good" (p = 0.027). Tip-Apex Distance (TAD) mean was 23.2 ± 8.3 mm, and an adequate TAD with three-point fixation was seen in only 35% of cases. Mean time to failure was 401.0 ± 237.2 days, with mean age at failure of 74.0 ± 14.8 years. Options after failure included revision CMN nail, proximal femoral locking plate (PFLP), long-stem or restoration arthroplasty, or femoral endoprosthesis. Barthel Functional Index scores showed no significant difference at 3 and 12 months post-operatively, nor any difference between treatment groups. Mean 12-month mortality was 30%, akin to a primary hip fracture mortality risk according to NICE guidelines. Mortality rates were lowest in revision nails. Subsequent revision rates were higher in the PFLP group. There is no reported evidence on the best surgical technique for managing the failed CMN, with no clear functional benefit in the options above. Good surgical technique at the time of primary CMN surgery is critical in minimising fatigue failure. After revision, overall mortality rates were equivalent to reported primary hip fracture mortality rates. Further multicentre evaluations are required to assess which technique convey the best functional outcomes without compromising 12-month mortality rates.

  8. Technical information management in an emergency response

    International Nuclear Information System (INIS)

    Berry, H.A.; Greve, C.; Best, R.G.; Phillipson, D.S.

    1991-01-01

    Through many experiences in responding to real radiation accidents and emergency response exercises, the Department of Energy (DOE) has developed a technical information management system that will be used in the Federal Radiological Monitoring and Assessment Center (FRMAC) in the event of a major radiological accident. The core of the system is the Data Center in the FRMAC, utilizing a computerized database of all off-site environmental radiological data. The information contained and managed by the Data Center will be comprehensive, accountable, and traceable, providing information to the assessors for immediate health and safety needs as well as for long-term documentation requirements. A DOE task force has been formed to develop compatibility guidelines for video, automated data processing, and communication systems. An electronic mail, information status, and bulletin board system is also being developed to assist in the dissemination of information. Geographic Information Systems (GIS) offer a giant step forward in displaying and analyzing information in a geographically referenced system

  9. Revision of failed shoulder hemiarthroplasty to reverse total arthroplasty: analysis of 157 revision implants.

    Science.gov (United States)

    Merolla, Giovanni; Wagner, Eric; Sperling, John W; Paladini, Paolo; Fabbri, Elisabetta; Porcellini, Giuseppe

    2018-01-01

    There remains a paucity of studies examining the conversion of failed hemiarthroplasty (HA) to reverse total shoulder arthroplasty (RTSA). Therefore, the purpose of this study was to examine a large series of revision HA to RTSA. A population of 157 patients who underwent conversion of a failed HA to a revision RTSA from 2006 through 2014 were included. The mean follow-up was 49 months (range, 24-121 months). The indications for revision surgery included instability with rotator cuff insufficiency (n = 127) and glenoid wear (n = 30); instability and glenoid wear were associated in 38 cases. Eight patients with infection underwent 2-stage reimplantation. Patients experienced significant improvements in their preoperative to postoperative pain and shoulder range of motion (P surgeries, secondary to glenoid component loosening (n = 3), instability (n = 3), humeral component disassembly (n = 2), humeral stem loosening (n = 1), and infection (n = 2). Implant survivorship was 95.5% at 2 years and 93.3% at 5 years. There were 4 reoperations including axillary nerve neurolysis (n = 2), heterotopic ossification removal (n = 1), and hardware removal for rupture of the metal cerclage for an acromial fracture (n = 1). At final follow-up, there were 5 "at-risk" glenoid components. Patients experience satisfactory pain relief and recovery of reasonable shoulder function after revision RTSA from a failed HA. There was a relatively low revision rate, with glenoid loosening and instability being the most common causes. Copyright © 2017 Journal of Shoulder and Elbow Surgery Board of Trustees. Published by Elsevier Inc. All rights reserved.

  10. Operations Program Plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1990-09-01

    This document, Revision 4 of the Operations Program Plan, has been developed as the seven-year master plan for operating of the Waste Isolation Pilot Plant (WIPP). Subjects covered include public and technical communications; regulatory and environmental programs; startup engineering; radiation handling, surface operations, and underground operations; waste certification and waste handling; transportation development; geotechnical engineering; experimental operations; engineering program; general maintenance; security program; safety, radiation, and regulatory assurance; quality assurance program; training program; administration activities; management systems program; and decommissioning. 243 refs., 19 figs., 25 tabs. (SM)

  11. Operations and Maintenance Manual, Atmospheric Contaminant Sensor, Revision B.

    Science.gov (United States)

    National Aeronautics and Space Administration, Washington, DC.

    The sensor is a mass spectrometer system which continuously monitors the atmospheric constituents of hydrogen, water vapor, nitrogen, oxygen, and carbon dioxide, and monitors the Freons on a demand sampling basis. The manual provides a system description, operational procedures, and maintenance and troubleshooting instructions. Circuit diagrams…

  12. Insurance Cover for Revised Nuclear Liability

    International Nuclear Information System (INIS)

    Reitsma, S. M. S.

    2008-01-01

    The financial security to be provided to victims of an incident at a nuclear installation is the main objective of international nuclear liability conventions. As from the introduction of the Paris Convention on Third Party Liability in the Field of Nuclear Energy in 1960 and the Vienna Convention on Liability for Nuclear Damage in 1963 insurers have been prepared to provide the financial capacity needed to cover the liability under both conventions. They did so in close co-operation with the competent national and international authorities, which has resulted in the insurability of as much of the nuclear liability under the conventions as possible. This tradition of co-operation between authorities and insurers was extended to include the revision negotiations regarding the above conventions, which were concluded in 1997 and 2004 respectively. This has resulted in the insurability of by far the largest part of the convention based liability. However, some heads of damage have been introduced about which insurers had expressed concerns as to their likelihood to attract insurance support. In view of the explicit choice by Convention States to include the uninsurable heads of damage into the revised conventions one would expect that liability for them would fall upon national Governments. This would reflect practice in a number of States, which already assume liability for uninsurable mandatory liabilities for a long time. Nonetheless some other States now seem reluctant to do so, the resulting deadlock having a tendency to manifest itself in a negative perception of the insurance industry. Insurers are therefore appreciative of the forum provided by the CNS to once again explain the areas where problems as regards insurability have arisen and why this is the case. This presentation will show that those areas are few in number and notably relate to a limited number of environmental damages as well as the extension of prescription periods. Furthermore, thoughts will

  13. Revision of the DELFIC Particle Activity Module

    Energy Technology Data Exchange (ETDEWEB)

    Hooper, David A [ORNL; Jodoin, Vincent J [ORNL

    2010-09-01

    The Defense Land Fallout Interpretive Code (DELFIC) was originally released in 1968 as a tool for modeling fallout patterns and for predicting exposure rates. Despite the continual advancement of knowledge of fission yields, decay behavior of fission products, and biological dosimetry, the decay data and logic of DELFIC have remained mostly unchanged since inception. Additionally, previous code revisions caused a loss of conservation of radioactive nuclides. In this report, a new revision of the decay database and the Particle Activity Module is introduced and explained. The database upgrades discussed are replacement of the fission yields with ENDF/B-VII data as formatted in the Oak Ridge Isotope Generation (ORIGEN) code, revised decay constants, revised exposure rate multipliers, revised decay modes and branching ratios, and revised boiling point data. Included decay logic upgrades represent a correction of a flaw in the treatment of the fission yields, extension of the logic to include more complex decay modes, conservation of nuclides (including stable nuclides) at all times, and conversion of key variables to double precision for nuclide conservation. Finally, recommended future work is discussed with an emphasis on completion of the overall radiation physics upgrade, particularly for dosimetry, induced activity, decay of the actinides, and fractionation.

  14. Sensitivity Studies on Revised PSA Model of KHNP Nuclear Power Plants

    International Nuclear Information System (INIS)

    Lee, Hyun-Gyo; Hwang, Seok-Won; Shin, Tae-Young

    2016-01-01

    Korea also performed safety revaluation for all nuclear power plants led by Korean regulatory and elicited 49 improvement factor for plants. One of those factors is Severe Accident Management Guidelines (SAMG) development, KHNP decided to develop Low Power and Shutdown(LPSD) Probabilistic Safety Assessment (PSA) models and upgrade full power PSA models of all operating plants for enhancement of guideline quality. In this paper we discuss about the effectiveness of post Fukushima equipment and improvements of each plant based on the results of revised full power PSA and newly developed LPSD PSA. Through sensitivity analysis based on revised PSA models we confirmed that the facilities installed or planned to installation as follow-up measures of Fukushima accident helped to enhance the safety of nuclear power plants. These results will provide various technical insights to scheduled studies which evaluate effectiveness of Fukushima post action items and develop accident management guideline. Also it will contribute to improve nuclear power plants safety

  15. Sensitivity Studies on Revised PSA Model of KHNP Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Hyun-Gyo; Hwang, Seok-Won; Shin, Tae-Young [KHNP, Daejeon (Korea, Republic of)

    2016-10-15

    Korea also performed safety revaluation for all nuclear power plants led by Korean regulatory and elicited 49 improvement factor for plants. One of those factors is Severe Accident Management Guidelines (SAMG) development, KHNP decided to develop Low Power and Shutdown(LPSD) Probabilistic Safety Assessment (PSA) models and upgrade full power PSA models of all operating plants for enhancement of guideline quality. In this paper we discuss about the effectiveness of post Fukushima equipment and improvements of each plant based on the results of revised full power PSA and newly developed LPSD PSA. Through sensitivity analysis based on revised PSA models we confirmed that the facilities installed or planned to installation as follow-up measures of Fukushima accident helped to enhance the safety of nuclear power plants. These results will provide various technical insights to scheduled studies which evaluate effectiveness of Fukushima post action items and develop accident management guideline. Also it will contribute to improve nuclear power plants safety.

  16. Integrating Relational Reasoning and Knowledge Revision during Reading

    Science.gov (United States)

    Kendeou, Panayiota; Butterfuss, Reese; Van Boekel, Martin; O'Brien, Edward J.

    2017-01-01

    Our goal in this theoretical contribution is to connect research on knowledge revision and relational reasoning. To achieve this goal, first, we review the "knowledge revision components framework" (KReC) that provides an account of knowledge revision processes, specifically as they unfold during reading of texts. Second, we review a…

  17. Safety analysis report for the Mixed Waste Storage Facility and portable storage units at the Idaho National Engineering Laboratory. Revision 4

    International Nuclear Information System (INIS)

    Peatross, R.

    1997-01-01

    This revision contains Section 2 only which gives a description of the Mixed Waste Storage Facility (MWSF) and its operations. Described are the facility location, services and utilities, process description and operation, and safety support systems. The MWSF serves as a storage and repackaging facility for low-level mixed waste

  18. Nevada Test Site waste acceptance criteria [Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    1997-08-01

    Revision one updates the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the NTS. Review each section of this document. This document is not intended to include all of the requirements; rather, it is meant as a guide toward meeting the regulations. All references in this document should be observed to avoid omission of requirements on which acceptance or rejection of waste will be based. The Department of Energy/Nevada Operations Office (DOE/NV) and support contractors are available to assist you in understanding or interpreting this document.

  19. Nevada Test Site waste acceptance criteria [Revision 1

    International Nuclear Information System (INIS)

    None

    1997-01-01

    Revision one updates the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the NTS. Review each section of this document. This document is not intended to include all of the requirements; rather, it is meant as a guide toward meeting the regulations. All references in this document should be observed to avoid omission of requirements on which acceptance or rejection of waste will be based. The Department of Energy/Nevada Operations Office (DOE/NV) and support contractors are available to assist you in understanding or interpreting this document

  20. The use of customized cages in revision total hip arthroplasty for Paprosky type III acetabular bone defects.

    Science.gov (United States)

    Mao, Yuanqing; Xu, Chen; Xu, Jiawei; Li, Huiwu; Liu, Fengxiang; Yu, Degang; Zhu, Zhenan

    2015-10-01

    Revision total hip arthroplasty (THA) is challenging if severe periacetabular bone loss is present. Here we describe a method that uses a customised cage to reconstruct an acetabulum with a massive bone defect. Designed with the aid of the rapid prototyping technique, a customised cage with a hook, crest and flange or braids was made, and then utilized to reconstruct severe compromised acetabulum in revision THA since 2001. Twenty-two patients (23 hips) were included in this study. The mean patient age at the time of surgery was 60.9 years (range, 38-80 years). Three hips had massive acetabular bone defects of Paprosky type IIIA and 20 of type IIIB. The Harris hip score was used to evaluate hip function. Radiographs were taken to evaluate loosening of the cage and resorption of allograft bone. The average follow up was 81.6 ± 24.9 months. The mean Harris hip score improved from 39.6 pre-operatively to 80.9 at the final follow-up. There were no instances of deep infection, severe venous thrombosis, and nerve palsy. One patient who had an intra-operative rupture of the superior acetabular artery was successfully treated using the haemostatic suturing technique. Two patients experienced dislocation at post-operative days four and six, respectively, and both were treated with closed reduction and skin traction for three weeks. The present study demonstrates that a customised cage may be a promising option for THA revision of severely compromised acetabula. Extended follow-up is necessary to evaluate the long-term performance of this approach.

  1. Water Treatment Plant Operation Volume 2. A Field Study Training Program. Revised.

    Science.gov (United States)

    California State Univ., Sacramento. School of Engineering.

    The purpose of this water treatment field study training program is to: (1) develop new qualified water treatment plant operators; (2) expand the abilities of existing operators, permitting better service both to employers and public; and (3) prepare operators for civil service and certification examinations (examinations administered by…

  2. 40 CFR 60.4124 - Hg budget permit revisions.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Hg budget permit revisions. 60.4124... Coal-Fired Electric Steam Generating Units Permits § 60.4124 Hg budget permit revisions. Except as provided in § 60.4123(b), the permitting authority will revise the Hg Budget permit, as necessary, in...

  3. 77 FR 66432 - Request for Extension and Revision of a Currently Approved Information Collection for the...

    Science.gov (United States)

    2012-11-05

    ... opportunity to develop a personal relationship with their customers; and cultivate consumer loyalty with the... Management and Budget, for an extension of and revision to the currently approved information collection for... affiliated with a farm where transactions between a farm market operator and customers take place. A farm...

  4. Operational amplifier circuits analysis and design

    CERN Document Server

    Nelson, J C C

    1995-01-01

    This book, a revised and updated version of the author's Basic Operational Amplifiers (Butterworths 1986), enables the non-specialist to make effective use of readily available integrated circuit operational amplifiers for a range of applications, including instrumentation, signal generation and processing.It is assumed the reader has a background in the basic techniques of circuit analysis, particularly the use of j notation for reactive circuits, with a corresponding level of mathematical ability. The underlying theory is explained with sufficient but not excessive, detail. A range of compu

  5. Performance Evaluation Report for Soil Vapor Extraction Operations at the Carbon Tetrachloride Site, February 1992 - September 1998

    International Nuclear Information System (INIS)

    Rohay, V. J.

    1999-01-01

    Soil vapor extraction (SVE) is being used to remove carbon tetrachloride from the vadose zone at the 200-ZP-2 Operable Unit. The purpose of this report is to evaluate both the SVE system operating data and the effectiveness of SVE in remediating the carbon tetrachloride contamination. This report has been revised to cover the operating period from February 25, 1992 through September 30, 1998. The scope of the report includes the history of SVE operations at 200-ZP-2, the efficiency of those operations over time, the volume of vapor processed per extraction system, the change in carbon tetrachloride concentrations with time, the mass of carbon tetrachloride removed per site, and recommendations for future operations and evaluations. This revision includes an update to the carbon tetrachloride conceptual model

  6. Safety Evaluation Report on Tennessee Valley Authority: Revised Corporate Nuclear Performance Plan

    International Nuclear Information System (INIS)

    1987-07-01

    The TVA Corporate Nuclear Performance Plan addresses those corporate concerns identified by the NRC staff. Because much of the TVA corporate plan is programmatic, its effectiveness depends on its implementation, and the NRC staff plans to closely monitor this implementation. The NRC staff will address site-specific concerns in subsequent SERs on each volume of the Nuclear Performance Plan. On the basis of its review, the NRC staff finds TVA's revised Corporate Nuclear Performance Plan (Revision 4) acceptable. The NRC staff concludes that the organization and staffing of TVA's Office of Nuclear Power and the programmatic improvements in place or under way are sufficient, if implemented properly, to resolve the problems at the corporate level that led to issuance of the 10 CFR 50.54(f) letter dated September 17, 1985, and to support continuing TVA nuclear activities, including plant operations. 19 refs., 3 figs

  7. Revised IAEA Code of Conduct on the Safety and Security of Radioactive Sources

    International Nuclear Information System (INIS)

    Wheatley, J. S.

    2004-01-01

    The revised Code of Conduct on the Safety and Security of Radioactive Sources is aimed primarily at Governments, with the objective of achieving and maintaining a high level of safety and security of radioactive sources through the development, harmonization and enforcement of national policies, laws and regulations; and through the fostering of international co-operation. It focuses on sealed radioactive sources and provides guidance on legislation, regulations and the regulatory body, and import/export controls. Nuclear materials (except for sources containing 239Pu), as defined in the Convention on the Physical Protection of Nuclear Materials, are not covered by the revised Code, nor are radioactive sources within military or defence programmes. An earlier version of the Code was published by IAEA in 2001. At that time, agreement was not reached on a number of issues, notably those relating to the creation of comprehensive national registries for radioactive sources, obligations of States exporting radioactive sources, and the possibility of unilateral declarations of support. The need to further consider these and other issues was highlighted by the events of 11th September 2001. Since then, the IAEA's Secretariat has been working closely with Member States and relevant International Organizations to achieve consensus. The text of the revised Code was finalized at a meeting of technical and legal experts in August 2003, and it was submitted to IAEA's Board of Governors for approval in September 2003, with a recommendation that the IAEA General Conference adopt it and encourage its wide implementation. The IAEA General Conference, in September 2003, endorsed the revised Code and urged States to work towards following the guidance contained within it. This paper summarizes the history behind the revised Code, its content and the outcome of the discussions within the IAEA Board of Governors and General Conference. (Author) 8 refs

  8. A taxonomic revision of the genus Podocarpus

    OpenAIRE

    Laubenfels, de, D.J.

    1985-01-01

    In connection with the forthcoming revision of the Coniferae for the Flora Malesiana, the author thought it necessary to revise the genus Podocarpus. Although this genus has a substantial representation in Malesia (30 species), the revision is too involved to be appropriate with the Flora Malesiana per se. One new subgenus and 17 new sections are described, and 94 species are enumerated, of which 11 species and 1 variety are described as new, and 3 varieties have been raised to specific rank....

  9. The Revised Guiding Principles and General Operating Rules to Govern the Provision of Technical Assistance by the Agency. Latest Status (Spanish Edition); Texto Revisado de Los Principios Rectores n Normas Generales de Ejecucion Para la Prestacion de Asistencia Tecnica por el Organismo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1979-03-15

    The Revised Guiding Principles and General Operating Rules to Govern the Provision of Technical Assistance by the Agency were approved by the Board of Governors on 21 February 1979. The test is reproduced herein for the information of all Members. The provisions established by the Board of Governors on 24 September 1977 for the application of safeguards in relation to the granting of technical assistance are also reproduced in the Annex to the Revised Guiding Principles and General Operating Rules. [Spanish] El 21 de febrero de 1979 la Junta de Gobernadores aprobo el texto revisado de los Principios rectores y normas generales de ejecucion para la prestacion de asistencia tecnica por el Organismo. Para informacion de todos los Estados Miembros, en el presente documento se transcribe dicho texto. En el Anexo del texto revisado de los Principios rectores y normas generales de ejecucion se transcriben tambien las disposiciones prescritas por la Junta de Gobernadores el 24 de septiembre de 1977 acerca de la aplicacion de salvaguardias en relacion con la asistencia tecnica.

  10. Revised Human Health Risk Assessment on Chlorpyrifos

    Science.gov (United States)

    We have revised our human health risk assessment and drinking water exposure assessment for chlorpyrifos that supported our October 2015 proposal to revoke all food residue tolerances for chlorpyrifos. Learn about the revised analysis.

  11. REVISION PERMISSIABILITY IN CIVIL PROCEDURE IN REPUBLIC OF MACEDONIA

    Directory of Open Access Journals (Sweden)

    Marina Gligorova

    2015-04-01

    Full Text Available The revision as an extraordinary legal remedy is one more legal instrument for litigant in the effort to achieve protection of the rights or to defend against ungrounded claims of the other party. Litigants may declare revision of the litigation process due to substantive violations of the provisions of Civil Procedure and incorrect application of substantive law. Declaring revision because of a substantive violation of the provisions of Civil Procedure is limited. The purpose of this research paper is to investigate the most common reasons for filing revision of the litigation process in the period from June 2011 to June in 2012. The research includes what kind of reasons are often repeated, and the volume, or the number of reviews submitted to the Supreme Court of the Republic of Macedonia. As general hypothesis is that most of the adopted revisions are due to substantial violations of the provisions of civil procedure. Two-thirds of the stated revisions in front of the Supreme Court of Republic of Macedonia were rejected as unfounded and only one third of the submitted revisions from June 2011 to June 2012 were grounded. Since accepted revisions 59% due to incorrect application of substantive law, and 41% due to substantial violations of the provisions of Civil Procedure.

  12. Resource utilization in surgery after the revision of surgical fee schedule in Japan.

    Science.gov (United States)

    Nakata, Yoshinori; Yoshimura, Tatsuya; Watanabe, Yuichi; Otake, Hiroshi; Oiso, Giichiro; Sawa, Tomohiro

    2015-01-01

    The purpose of this paper is to examine whether the current surgical reimbursement system in Japan reflects resource utilization after the revision of fee schedule in 2014. The authors collected data from all the surgical procedures performed at Teikyo University Hospital from April 1 through September 30, 2014. The authors defined the decision-making unit as a surgeon with the highest academic rank in the surgery. Inputs were defined as the number of medical doctors who assisted surgery, and the time of operation from skin incision to closure. An output was defined as the surgical fee. The authors calculated surgeons' efficiency scores using data envelopment analysis. The efficiency scores of each surgical specialty were significantly different (p=0.000). This result demonstrates that the Japanese surgical reimbursement scales still fail to reflect resource utilization despite the revision of surgical fee schedule.

  13. Validity of administrative database code algorithms to identify vascular access placement, surgical revisions, and secondary patency.

    Science.gov (United States)

    Al-Jaishi, Ahmed A; Moist, Louise M; Oliver, Matthew J; Nash, Danielle M; Fleet, Jamie L; Garg, Amit X; Lok, Charmaine E

    2018-03-01

    We assessed the validity of physician billing codes and hospital admission using International Classification of Diseases 10th revision codes to identify vascular access placement, secondary patency, and surgical revisions in administrative data. We included adults (≥18 years) with a vascular access placed between 1 April 2004 and 31 March 2013 at the University Health Network, Toronto. Our reference standard was a prospective vascular access database (VASPRO) that contains information on vascular access type and dates of placement, dates for failure, and any revisions. We used VASPRO to assess the validity of different administrative coding algorithms by calculating the sensitivity, specificity, and positive predictive values of vascular access events. The sensitivity (95% confidence interval) of the best performing algorithm to identify arteriovenous access placement was 86% (83%, 89%) and specificity was 92% (89%, 93%). The corresponding numbers to identify catheter insertion were 84% (82%, 86%) and 84% (80%, 87%), respectively. The sensitivity of the best performing coding algorithm to identify arteriovenous access surgical revisions was 81% (67%, 90%) and specificity was 89% (87%, 90%). The algorithm capturing arteriovenous access placement and catheter insertion had a positive predictive value greater than 90% and arteriovenous access surgical revisions had a positive predictive value of 20%. The duration of arteriovenous access secondary patency was on average 578 (553, 603) days in VASPRO and 555 (530, 580) days in administrative databases. Administrative data algorithms have fair to good operating characteristics to identify vascular access placement and arteriovenous access secondary patency. Low positive predictive values for surgical revisions algorithm suggest that administrative data should only be used to rule out the occurrence of an event.

  14. Test-Retest Reliability of the Parent Behavior Importance Questionnaire-Revised and the Parent Behavior Frequency Questionnaire-Revised

    Science.gov (United States)

    Mowder, Barbara A.; Shamah, Renee

    2011-01-01

    This study evaluated the test-retest reliability of two parenting measures: the Parent Behavior Importance Questionnaire-Revised (PBIQ-R) and Parent Behavior Frequency Questionnaire-Revised (PBFQ-R). These self-report parenting behavior assessment measures may be utilized as pre- and post-parent education program measures, with parents as well as…

  15. What Is the Impact of Smoking on Revision Total Knee Arthroplasty?

    Science.gov (United States)

    Bedard, Nicholas A; Dowdle, S Blake; Wilkinson, Brandon G; Duchman, Kyle R; Gao, Yubo; Callaghan, John J

    2018-07-01

    There is a paucity of literature evaluating the impact of smoking on revision arthroplasty procedures. The purpose of this study was to identify the effect of smoking on complications after revision total knee arthroplasty (rTKA). We queried the American College of Surgeons National Surgical Quality Improvement Program (NSQIP) database to identify patients who underwent rTKA between 2006 and 2014. Patients were divided into current smokers and nonsmokers according to the NSQIP definitions. Each cohort was compared in terms of demographic data, preoperative comorbidities, and operative time. Infection end points were created from composite surgical site infection variables defined by the NSQIP database. Multivariate logistic regression analysis was utilized to adjust for confounding variables and calculate adjusted odds ratios (ORs) and associated 95% confidence intervals (95% CIs). In total, 8776 patients underwent rTKA. Of these patients, 11.6% were current smokers. Univariate analyses demonstrated that smokers had a higher rate of any wound complication (3.8% vs 1.8%, P < .0001), deep infection (2.5% vs 1.0%, P < .0001), pneumonia (1.3% vs 0.4%, P < .0001), and reoperation (5.0% vs 3.1%, P = .001) compared to nonsmokers undergoing revision total knee arthroplasty. Multivariate analysis identified current smokers as being at a significantly increased risk of any wound complication (OR 2.1; 95% CI 1.4-3.1) and deep infection (OR 2.1, 95% CI 1.2-3.6) after rTKA. This study demonstrates that smoking significantly increases the risk of infection, wound complications, and reoperation after rTKA. The results are even more magnified for revision procedures compared to published effects of smoking on primary total knee arthroplasty complications. Further research is needed regarding the impact of smoking cessation on mitigation of these observed risks. Copyright © 2018 Elsevier Inc. All rights reserved.

  16. Team interaction skills evaluation criteria for nuclear power plant control room operators

    International Nuclear Information System (INIS)

    Montgomery, J.C.; Hauth, J.T.

    1991-01-01

    Team interaction skills are an essential aspect of safe nuclear power plant control room operations. Previous research has shown that, when a group works together, rather than as individuals, more effective operations are possible. However, little research has addressed how such team interaction skills can be measured. In this study rating scales were developed specifically for such a measurement purpose. Dimensions of team skill performance were identified from previous research and experience in the area, incorporating the input of Pacific Northwest Laboratory (PNL) contract operator licensing examiners. Rating scales were developed on the basis of these dimensions, incorporating a modified Behaviorally Anchored Rating Scale (BARS) as well as Behavioral Frequency formats. After a pilot-testing/revision process, rating data were collected using 11 control room crews responding to simulator scenarios at a boiling water and a pressurized water reactor. Statistical analyses of the resulting data revealed moderate inter-rater reliability using the Behavioral Frequency scales, relatively low inter-rater reliability using the BARS, and moderate support for convergent and discriminant validity of the scales. It was concluded that the scales show promise psychometrically and in terms of user acceptability, but that additional scale revision is needed before field implementation. Recommendations for scale revision and directions for future research were presented

  17. Functional outcome, revision rates and mortality after primary total hip replacement--a national comparison of nine prosthesis brands in England.

    Directory of Open Access Journals (Sweden)

    Mark Pennington

    Full Text Available The number of prosthesis brands used for hip replacement has increased rapidly, but there is little evidence on their effectiveness. We compared patient-reported outcomes, revision rates, and mortality for the three most frequently used brands within each prosthesis type: cemented (Exeter V40 Contemporary, Exeter V40 Duration and Exeter V40 Elite Plus Ogee, cementless (Corail Pinnacle, Accolade Trident, and Taperloc Exceed, and hybrid (Exeter V40 Trilogy, Exeter V40 Trilogy, and CPT Trilogy.We used three national databases of patients who had hip replacements between 2008 and 2011 in the English NHS to compare functional outcome (Oxford Hip Score (OHS ranging from 0 (worst to 48 (best in 43,524 patients at six months. We analysed revisions and mortality in 187,201 patients. We used multiple regression to adjust for pre-operative differences. Prosthesis type had an impact on post-operative OHS and revision rates (both p<0.001. Patients with hybrid prostheses had the best functional outcome (mean OHS 39.4, 95%CI 39.1 to 39.7 and those with cemented prostheses the worst (37.7, 37.3 to 38.1. Patients with cemented prostheses had the lowest reported 5-year revision rates (1.3%, 1.2% to 1.4% and those with cementless prostheses the highest (2.2%, 2.1% to 2.4%. Differences in mortality according to prosthesis type were small and not significant (p = 0.06. Functional outcome varied according to brand among cemented (p = 0.05, with Exeter V40 Duration having the best and cementless prostheses (p = 0.01, with Corail Pinnacle having the best. Revision rates varied according to brand among hybrids (p = 0.05, with Exeter V40 Trident having the lowest.Functional outcomes were better with cementless cups and revision rates were lower with cemented stems, which underlies the good overall performance of hybrids. The hybrid Exeter V40 Trident seemed to produce the best overall results. This brand should be considered as a benchmark in randomised trials.

  18. Revision of infected knee arthroplasties in Denmark

    DEFF Research Database (Denmark)

    Lindberg-Larsen, Martin; Jørgensen, Christoffer C; Bagger, Jens

    2016-01-01

    Background and purpose - The surgical treatment of periprosthetic knee infection is generally either a partial revision procedure (open debridement and exchange of the tibial insert) or a 2-stage exchange arthroplasty procedure. We describe the failure rates of these procedures on a nationwide...... basis. Patients and methods - 105 partial revisions (100 patients) and 215 potential 2-stage revision procedures (205 patients) performed due to infection from July 1, 2011 to June 30, 2013 were identified from the Danish Knee Arthroplasty Register (DKR). Failure was defined as surgically related death...

  19. 75 FR 60485 - NRC Enforcement Policy Revision

    Science.gov (United States)

    2010-09-30

    ... NUCLEAR REGULATORY COMMISSION [NRC-2008-0497] NRC Enforcement Policy Revision AGENCY: Nuclear Regulatory Commission. ACTION: Policy statement. SUMMARY: The Nuclear Regulatory Commission (NRC or Commission) is publishing a major revision to its Enforcement Policy (Enforcement Policy or Policy) to...

  20. [Revised practice guideline 'Anaemia in midwifery practice'

    NARCIS (Netherlands)

    Beentjes, M.; Jans, S.M.P.J.

    2012-01-01

    The practice guideline of the Royal Dutch Organization of Midwives 'Anaemia in primary care midwifery practice' published in 2000, has recently been revised. The revised guideline takes physiological haemodilution during pregnancy into consideration and provides gestation specific reference values

  1. Analysis of NRC Regulatory Guide 1.21 Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sung Il; Yook, Dae Sik; Lee, Byung Soo [KINS, Daejeon (Korea, Republic of)

    2015-05-15

    It is essential to have a degree of uniformity in the methods used for measuring, evaluating, recording, and reporting data on radioactive material in effluents and solid wastes. For this purpose, the U.S. Nuclear Regulatory Commission (NRC) released a revised version of the Regulatory Guide 1.21 'Measuring, evaluating, and reporting radioactive material in liquid and gaseous effluents and solid waste' (revision 2) in 2009, updating the revision 1 version released in 1974. This study compares the previous revision 1 (1974) version with the revision 2 (2009) version to elaborate on the application of the guidelines to Korea. This study consists of an analysis of the 2009 Revision 2 version of the U.S. NRC Regulatory Guidelines 1.21 and an exposition of methods for its application in the domestic environment. Major revisions were made to allow for the adoption of a risk informed approach. Radionuclides with lower than 1% contribution to emission or radiation levels can be selected as principal radionuclides. Requirements for analysis of leaks and spills have been reinforced, with additional groundwater monitoring and hydrological data analysis becoming necessary.

  2. Transportation System Concept of Operations

    Energy Technology Data Exchange (ETDEWEB)

    N. Slater-Thompson

    2006-08-16

    level descriptions. of subsystems and components, and the Transportation System Requirements Document. Other program and system documents, plans, instructions, and detailed designs will be consistent with and informed by the Transportation System Concept of Operations. The Transportation System Concept of Operations is a living document, enduring throughout the OCRWM systems engineering lifecycle. It will undergo formal approval and controlled revisions as appropriate while the Transportation System matures. Revisions will take into account new policy decisions, new information available through system modeling, engineering investigations, technical analyses and tests, and the introduction of new technologies that can demonstrably improve system performance.

  3. Cement augmentation in the proximal femur to prevent stem subsidence in revision hip arthroplasty with Paprosky type II/IIIa defects

    Directory of Open Access Journals (Sweden)

    Shang-Wen Tsai

    2018-06-01

    Full Text Available Background: Subsidence remains a common complication after revision hip arthroplasty which may lead to prolonged weight-bearing restrictions, leg-length discrepancies or considerable loss of function. We evaluated the effectiveness of cement augmentation in the proximal femoral metaphysis during a revision of femoral components to prevent post-operative stem subsidence. Methods: Forty patients were enrolled. Follow-up averaged 67.7 months (range: 24–149. Twenty-seven patients had a Paprosky type II defect and 13 had a type IIIa defect. All revision hip arthroplasty used a cementless, cylindrical, non-modular cobalt–chromium stem. The defect in the metaphysis was filled with antibiotic-loaded bone cement. Thirteen patients who had undergone stem revision only was allowed to walk immediately without weight-bearing restrictions. Twenty-seven patients who had undergone revision total hip arthroplasty was allowed partial weight-bearing within 6 weeks after surgery in the consideration of acetabular reconstruction. Results: Three patients (7.5% had post-surgery stem subsidences of three mm, five mm, and 10 mm, respectively, at three, one, and 14 months. There were no acute surgical site infections. There were three femoral stem failures: two delayed infections and one periprosthetic Vancouver B2 fracture. Both five- and 10-year survivorships of the femoral implant were 90.1%. Conclusion: An adequate length of the scratch-fit segment and diaphyseal ingrowth remain of paramount importance when revising femoral components. To fill metaphyseal bone defects with antibiotic-loaded bone cement may be an alternative method in dealing with proximal femoral bone loss during a femoral revision. Keywords: Bone defect, Cement augmentation, Femur, Revision hip arthroplasty, Subsidence

  4. Comparison of Wells and Revised Geneva Rule to Assess Pretest Probability of Pulmonary Embolism in High-Risk Hospitalized Elderly Adults.

    Science.gov (United States)

    Di Marca, Salvatore; Cilia, Chiara; Campagna, Andrea; D'Arrigo, Graziella; Abd ElHafeez, Samar; Tripepi, Giovanni; Puccia, Giuseppe; Pisano, Marcella; Mastrosimone, Gianluca; Terranova, Valentina; Cardella, Antonella; Buonacera, Agata; Stancanelli, Benedetta; Zoccali, Carmine; Malatino, Lorenzo

    2015-06-01

    To assess and compare the diagnostic power for pulmonary embolism (PE) of Wells and revised Geneva scores in two independent cohorts (training and validation groups) of elderly adults hospitalized in a non-emergency department. Prospective clinical study, January 2011 to January 2013. Unit of Internal Medicine inpatients, University of Catania, Italy. Elderly adults (mean age 76 ± 12), presenting with dyspnea or chest pain and with high clinical probability of PE or D-dimer values greater than 500 ng/mL (N = 203), were enrolled and consecutively assigned to a training (n = 101) or a validation (n = 102) group. The clinical probability of PE was assessed using Wells and revised Geneva scores. Clinical examination, D-dimer test, and multidetector computed angiotomography were performed in all participants. The accuracy of the scores was assessed using receiver operating characteristic analyses. PE was confirmed in 46 participants (23%) (24 training group, 22 validation group). In the training group, the area under the receiver operating characteristic curve was 0.91 (95% confidence interval (CI) = 0.85-0.98) for the Wells score and 0.69 (95% CI = 0.56-0.82) for the revised Geneva score (P < .001). These results were confirmed in the validation group (P < .05). The positive (LR+) and negative likelihood ratios (LR-) (two indices combining sensitivity and specificity) of the Wells score were superior to those of the revised Geneva score in the training (LR+, 7.90 vs 1.34; LR-, 0.23 vs 0.66) and validation (LR+, 13.5 vs 1.46; LR-, 0.47 vs 0.54) groups. In high-risk elderly hospitalized adults, the Wells score is more accurate than the revised Geneva score for diagnosing PE. © 2015, Copyright the Authors Journal compilation © 2015, The American Geriatrics Society.

  5. Belief Revision in the GOAL Agent Programming Language

    DEFF Research Database (Denmark)

    Spurkeland, Johannes Svante; Jensen, Andreas Schmidt; Villadsen, Jørgen

    2013-01-01

    Agents in a multiagent system may in many cases find themselves in situations where inconsistencies arise. In order to properly deal with these, a good belief revision procedure is required. This paper illustrates the usefulness of such a procedure: a certain belief revision algorithm is consider...... in order to deal with inconsistencies and, particularly, the issue of inconsistencies, and belief revision is examined in relation to the GOAL agent programming language....

  6. Revised Arrangements for the Management of Solid and Non-Aqueous Radioactive Waste - 12452

    Energy Technology Data Exchange (ETDEWEB)

    Fullbrook, Michael; Walker, Johann; Macnab, Alec [Atomic Weapons Establishment, Aldermaston (United Kingdom)

    2012-07-01

    In 2010, Atomic Weapons Establishment (AWE) identified a requirement to implement revised management arrangements for the generation, storage and disposal of radioactive waste. A thorough review of the current arrangements/processes was undertaken which included both legal compliance requirements and the identification of business improvement opportunities. On completion of this review a suitable project team was established and in 2011 an integrated Radioactive Waste Management process was implemented throughout the business. Initial results have shown measurable improvements within Radioactive Waste management compliance, operator understanding and increased business efficiency. Through the development and implementation of the revised working arrangements AWE has been able to continue to demonstrate both legal compliance to its regulators along with business efficiency and effectiveness improvements. Simple to follow process maps have improved employees understanding of Radioactive Waste management requirements, provided them with easily accessible information and ensured the business operates in a single coherent manner. The implementation of a modern electronic data management system has ensured all waste related information is easily retrievable and appropriately maintained. The additional functions that have been built into the system have reduced the potential for human error and increased the overall efficiency of the Waste Management department through the use of the automated report generation functionality. (authors)

  7. Current Epidemiology of Revision Total Knee Arthroplasty in the United States.

    Science.gov (United States)

    Delanois, Ronald E; Mistry, Jaydev B; Gwam, Chukwuweike U; Mohamed, Nequesha S; Choksi, Ujval S; Mont, Michael A

    2017-09-01

    Revision surgery for failed total knee arthroplasty (TKA) continues to pose a substantial burden for the United States healthcare system. The predominant etiology of TKA failure has changed over time and may vary between studies. This report aims to update the current literature on this topic by using a large national database. Specifically, we analyzed: (1) etiologies for revision TKA; (2) frequencies of revision TKA procedures; (3) various demographics including payer type and region; and (4) the length of stay (LOS) and total charges based on type of revision TKA procedure. The Healthcare Cost and Utilization Project (HCUP) National Inpatient Sample (NIS) database was used to identify all revision TKA procedures performed between 2009 and 2013. Clinical, economic, and demographic data were collected and analyzed for 337,597 procedures. Patients were stratified according to etiology of failure, age, sex, race, US census region, and primary payor class. The mean LOS and total charges were also calculated. Infection was the most common etiology for revision TKA (20.4%), closely followed by mechanical loosening (20.3%). The most common revision TKA procedure performed was all component revision (31.3%). Medicare was the primary payor for the greatest proportion of revisions (57.7%). The South census region performed the most revision TKAs (33.2%). The overall mean LOS was 4.5 days, with arthrotomy for removal of prosthesis without replacement procedures accounting for the longest stays (7.8 days). The mean total charge for revision TKAs was $75,028.07. Without appropriate measures in place, the burden of revision TKAs may become overwhelming and pose a strain on providers and institutions. Continued insight into the etiology and epidemiology of revision TKAs may be the principle step towards improving outcomes and mitigating the need for future revisions. Copyright © 2017 Elsevier Inc. All rights reserved.

  8. Problems of rotator cuff re-tear cases. Examination of operative findings

    International Nuclear Information System (INIS)

    Ishitani, Eiichi; Matsuura, Komei; Shin, Kunichika; Kawamoto, Taisaku; Hosokawa, Akira

    2007-01-01

    High re-tear rate is reported after rotator cuff repair in large and massive tear cases. Previously, we reported that 15% of patients after rotator cuff repair showed re-tear in MRI findings. In this study, 116 consecutive rotator cuff repaired patients who had been operated arthroscopically since 2003 were evaluated for size, torn site, fixation methods, mobility, and tendon quality. In addition, rehabilitation methods and occupation after revision were also evaluated. There were four patients who underwent re-operation. Rotator cuff repairs by revision surgery failed mechanically due to two reasons: the main factor of failure was suture material breakage in three cases and the second was tendon pulling through sutures in one case. The lack of thread strength was suggested. In addition, it is important to pull cuff stump to greater tubercle without excessive tension. Of re-operated cases, three engaging in manual labor suffered large and massive tear. In two cases, premature return to manual labor suggested cause of re-tear. (author)

  9. Outcome after failed traumatic anterior shoulder instability repair with and without surgical revision.

    Science.gov (United States)

    Marquardt, Björn; Garmann, Stefan; Schulte, Tobias; Witt, Kai-Axel; Steinbeck, Jörn; Pötzl, Wolfgang

    2007-01-01

    The purpose of this study was to evaluate the incidence and reasons of recurrent instability in patients with traumatic anterior shoulder instability and to document the clinical results with regard to the number of stabilizing procedures. Twenty-four patients with failed primary open or arthroscopic anterior shoulder stabilization were followed for a mean of 68 (36-114) months. Following recurrence of shoulder instability, eight patients chose not to be operated on again, whereas 16 underwent repeat stabilization. A persistent or recurrent Bankart lesion was found in all 16 patients and concomitant capsular redundancy in 4. After the first revision surgery, further instability occurred in 8 patients, and 6 of them were stabilized a third time. Only 7 patients (29%) achieved a good or excellent result according to the Rowe score. All shoulder scores improved after revision stabilization. However, the number of stabilizing procedures adversely affected the outcome scores, as well as postoperative range of motion and patient satisfaction. Recurrent instability after a primary stabilization procedure represents a difficult diagnostic and surgical challenge, and careful attention should be paid to address persistent or recurrent Bankart lesions and concomitant capsular reduncancy. A satisfying functional outcome can be expected mainly in patients with one revision surgery. Further stabilization attempts are associated with poorer objective and subjective results.

  10. Planned revision to DOE Order 5820.2A, Radioactive Waste Management

    Energy Technology Data Exchange (ETDEWEB)

    Duggan, G.J. [Dept. of Energy, Washington, DC (United States); Williams, R.E.; Kudera, D.E. [EG and G Idaho, Inc., Idaho Falls, ID (United States). Idaho National Engineering Lab.; Bailey, D.E. [NJG, Inc. (United States)

    1993-03-01

    US Department of Energy Headquarters initiated efforts to revise DOE Order 5820.2A, ``Radioactive Waste Management``. The purpose of the revision is to enhance DOE waste management requirements, reflect new DOE organizational responsibilities, and consolidate requirements for management of all waste, under the responsibility of Environmental Restoration and Waste Management, into a single order. This paper discusses the revision philosophy, objectives of the revision, and strategy for the revision. Issues being considered for inclusion in the revision and recommended methods of resolving each issue are also discussed.

  11. Technical specifications: Callaway Plant, Unit No. 1 (Docket No. STN 50-483). Appendix A to License No. NPF-30. Revision 1

    International Nuclear Information System (INIS)

    1984-10-01

    Revised specifications are presented concerning limiting safety system settings for control systems, power distribution, instrumentation, coolant system, emergency core cooling system, containment systems, plant systems, electrical systems, refueling operations, radioactive effluents, and radiation environmental monitoring

  12. Explanatory Coherence and Belief Revision in Naive Physics

    Science.gov (United States)

    1988-07-01

    continental drift (Thagard & Nowak, 1988), and debates about why the dinosaurs became extinct . Application of ECHO to the belief revisions in Pat and Hal...rewono of nocuamy Idid 4onoly by bodck number) Students of reasoning have long tried to understand how people revise systems of beliefs. We maintain...Princeton University Students of reasoning have long tried to understand how people revise systems of beliefs (see Wertheimer, 1945, for example). We will

  13. [Revision hip arthroplasty by Waldemar Link custom-made total hip prosthesis].

    Science.gov (United States)

    Medenica, Ivica; Luković, Milan; Radoicić, Dragan

    2010-02-01

    The number of patients undergoing hip arthroplasty revision is constantly growing. Especially, complex problem is extensive loss of bone stock and pelvic discontinuity that requires reconstruction. The paper presented a 50-year old patient, who ten years ago underwent a total cement artrhroplasty of the left hip. A year after the primary operation the patient had difficulties in walking without crutches. Problems intensified in the last five years, the patient had severe pain, totally limited movement in the left hip and could not walk at all. Radiographically, we found loose femoral component, massive loss of bone stock of proximal femur, acetabular protrusion and a consequent pelvic discontinuity. Clinically, a completely disfunctional left hip joint was registered (Harris hip score--7.1). We performed total rearthroplasty by a custom-made Waldemar Link total hip prosthesis with acetabular antiprotrusio cage and compensation of bone defects with a graft from the bone bank. A year after the operation, we found clinically an extreme improvement in Harris hip score--87.8. Radiographically, we found stability of implanted components, a complete graft integration and bone bridging across the site of pelvic discontinuity. Pelvic discontinuity and massive loss of proximal femoral bone stock is a challenging and complex entity. Conventional prostheses cannot provide an adequate fixation and stability of the hip. Application of custom-made prosthesis (measured specificaly for a patient) and additional alografting bone defects is a good method in revision surgery after unsuccessful hip arthroplasty with extensive bone defects.

  14. Results of revision anterior shoulder stabilization surgery in adolescent athletes.

    Science.gov (United States)

    Blackman, Andrew J; Krych, Aaron J; Kuzma, Scott A; Chow, Roxanne M; Camp, Christopher; Dahm, Diane L

    2014-11-01

    The purpose of this study was to determine failure rates, functional outcomes, and risk factors for failure after revision anterior shoulder stabilization surgery in high-risk adolescent athletes. Adolescent athletes who underwent primary anterior shoulder stabilization were reviewed. Patients undergoing subsequent revision stabilization surgery were identified and analyzed. Failure rates after revision surgery were assessed by Kaplan-Meier analysis. Failure was defined as recurrent instability requiring reoperation. Functional outcomes included the Marx activity score; American Shoulder and Elbow Surgeons score; and University of California, Los Angeles score. The characteristics of patients who required reoperation for recurrent instability after revision surgery were compared with those of patients who required only a single revision to identify potential risk factors for failure. Of 90 patients who underwent primary anterior stabilization surgery, 15 (17%) had failure and underwent revision surgery (mean age, 16.6 years; age range, 14 to 18 years). The mean follow-up period was 5.5 years (range, 2 to 12 years). Of the 15 revision patients, 5 (33%) had recurrent dislocations and required repeat revision stabilization surgery at a mean of 50 months (range, 22 to 102 months) after initial revision. No risk factors for failure were identified. The Kaplan-Meier reoperation-free estimates were 86% (95% confidence interval, 67% to 100%) at 24 months and 78% (95% confidence interval, 56% to 100%) at 48 months after revision surgery. The mean final Marx activity score was 14.8 (range, 5 to 20); American Shoulder and Elbow Surgeons score, 82.1 (range, 33 to 100); and University of California, Los Angeles score, 30.8 (range, 16 to 35). At 5.5 years' follow-up, adolescent athletes had a high failure rate of revision stabilization surgery and modest functional outcomes. We were unable to convincingly identify specific risk factors for failure of revision surgery. Level IV

  15. Plan-Belief Revision in Jason

    DEFF Research Database (Denmark)

    Jensen, Andreas Schmidt; Villadsen, Jørgen

    2015-01-01

    When information is shared between agents of unknown reliability, it is possible that their belief bases become inconsistent. In such cases, the belief base must be revised to restore consistency, so that the agent is able to reason. In some cases the inconsistent information may be due to use of...... of incorrect plans. We extend work by Alechina et al. to revise belief bases in which plans can be dynamically added and removed. We present an implementation of the algorithm in the AgentSpeak implementation Jason....

  16. Revised Huang-Yang multipolar pseudopotential

    International Nuclear Information System (INIS)

    Derevianko, Andrei

    2005-01-01

    A number of authors have recently pointed out inconsistencies of results obtained with the Huang-Yang multipolar pseudopotential for low-energy scattering [K. Huang and K. C. Yang, Phys. Rev. 105, 767 (1957); later revised by Huang, Statistical Mechanics (Wiley, New York, 1963)]. The conceptual validity of their original derivation has been questioned. Here I show that these inconsistencies are rather due to an algebraic mistake made by Huang and Yang. With the corrected error, I present the revised version of the multipolar pseudopotential

  17. Trends in Revision Elbow Ulnar Collateral Ligament Reconstruction in Professional Baseball Pitchers.

    Science.gov (United States)

    Wilson, Alexander T; Pidgeon, Tyler S; Morrell, Nathan T; DaSilva, Manuel F

    2015-11-01

    To determine the frequency of revision elbow ulnar collateral ligament (UCL) reconstruction in professional baseball pitchers. Data were collected on 271 professional baseball pitchers who underwent primary UCL reconstruction. Each player was evaluated retrospectively for occurrence of revision UCL reconstructive surgery to treat failed primary reconstruction. Data on players who underwent revision UCL reconstruction were compiled to determine total surgical revision incidence and revision rate by year. The incidence of early revision was analyzed for trends. Average career length after primary UCL reconstruction was calculated and compared with that of players who underwent revision surgery. Logistic regression analysis was performed to assess risk factors for revision including handedness, pitching role, and age at the time of primary reconstruction. Between 1974 and 2014, the annual incidence of primary UCL reconstructions among professional pitchers increased, while the proportion of cases being revised per year decreased. Of the 271 pitchers included in the study, 40 (15%) required at least 1 revision procedure during their playing career. Three cases required a second UCL revision reconstruction. The average time from primary surgery to revision was 5.2 ± 3.2 years (range, 1-13 years). The average length of career following primary reconstruction for all players was 4.9 ± 4.3 years (range, 0-22 years). The average length of career following revision UCL reconstruction was 2.5 ± 2.4 years (range, 0-8 years). No risk factors for needing revision UCL reconstruction were identified. The incidence of primary UCL reconstructions among professional pitchers is increasing; however, the rate of primary reconstructions requiring revision is decreasing. Explanations for the decreased revision rate may include improved surgical technique and improved rehabilitation protocols. Therapeutic IV. Copyright © 2015 American Society for Surgery of the Hand. Published by

  18. Sequenced Peer Revision: Creating Competence and Community

    Science.gov (United States)

    Bowman, Ingrid K.; Robertson, John

    2013-01-01

    Mastering techniques of self- and peer revision is a valuable tool for all writers, especially US-educated Generation 1.5 students, whose near fluency enables them to dialogue successfully about their writing. Using action research, 2 academic writing instructors systematically trained students to more responsibly and effectively revise their…

  19. Quantum interaction. Revised selected papers

    International Nuclear Information System (INIS)

    Song, Dawei; Zhang, Peng; Wang, Lei; Arafat, Sachi

    2011-01-01

    This book constitutes the thoroughly refereed post-conference proceedings of the 5th International Symposium on Quantum Interaction, QI 2011, held in Aberdeen, UK, in June 2011. The 26 revised full papers and 6 revised poster papers, presented together with 1 tutorial and 1 invited talk were carefully reviewed and selected from numerous submissions during two rounds of reviewing and improvement. The papers show the cross-disciplinary nature of quantum interaction covering topics such as computation, cognition, mechanics, social interaction, semantic space and information representation and retrieval. (orig.)

  20. Quantum interaction. Revised selected papers

    Energy Technology Data Exchange (ETDEWEB)

    Song, Dawei; Zhang, Peng; Wang, Lei [Aberdeen Univ. (United Kingdom). School of Computing; Melucci, Massimo [Padua Univ., Padova (Italy). Dept. of Information Engineering; Frommholz, Ingo [Bedfordshire Univ. (United Kingdom); Arafat, Sachi (eds.) [Glasgow Univ. (United Kingdom). School of Computing Science

    2011-07-01

    This book constitutes the thoroughly refereed post-conference proceedings of the 5th International Symposium on Quantum Interaction, QI 2011, held in Aberdeen, UK, in June 2011. The 26 revised full papers and 6 revised poster papers, presented together with 1 tutorial and 1 invited talk were carefully reviewed and selected from numerous submissions during two rounds of reviewing and improvement. The papers show the cross-disciplinary nature of quantum interaction covering topics such as computation, cognition, mechanics, social interaction, semantic space and information representation and retrieval. (orig.)

  1. Medical writing, revising and editing

    DEFF Research Database (Denmark)

    Pilegaard, Morten

    2006-01-01

    The globalization of science makes medical writing, editing and revision a rapidly growing field of linguistic study and practice. Medical science texts are written according to uniform, general guidelines and medical genres have become highly conventionalized in terms of structure and linguistic...... form. Medical editing often takes the form of peer review and mainly addresses issues of contents and overall validity. Medical revision incorporates the checking of the macrostructure and the microstructure of the text, its language and style and its suitability for the target reader or client...

  2. Review of decision aids for nuclear-plant operators

    International Nuclear Information System (INIS)

    Kisner, R.A.

    1983-01-01

    Responses to various computer-based operational aids varied widely in detail, thus forcing distillation of the salient features of many operational aids from information sources other than the initial questionnaire. These sources included technical and management presentations, technical papers and reports, personal discussions, taped responses, sales brochures, system specifications and schematics, and other documents. The data base is dynamic, not static, owing to the nature of current trends in operational aid development. The information contained in it is subject to review and revision by the developing organizations. More systems are pending review and entry into the data base; hence the list is incomplete

  3. Values of the Wells and Revised Geneva Scores Combined with D-dimer in Diagnosing Elderly Pulmonary Embolism Patients

    Directory of Open Access Journals (Sweden)

    Dan-Jie Guo

    2015-01-01

    Full Text Available Background: Pulmonary embolism (PE can be difficult to diagnose in elderly patients because of the coexistent diseases and the combination of drugs that they have taken. We aimed to compare the clinical diagnostic values of the Wells score, the revised Geneva score and each of them combined with D-dimer for suspected PE in elderly patients. Methods: Three hundred and thirty-six patients who were admitted for suspected PE were enrolled retrospectively and divided into two groups based on age (≥65 or <65 years old. The Wells and revised Geneva scores were applied to evaluate the clinical probability of PE, and the positive predictive values of both scores were calculated using computed tomography pulmonary arteriography as a gold standard; overall accuracy was evaluated by the area under the curve (AUC of receiver operator characteristic curve; the negative predictive values of D-dimer, the Wells score combined with D-dimer, and the revised Geneva score combined with D-dimer were calculated. Results: Ninety-six cases (28.6% were definitely diagnosed as PE among 336 cases, among them 56 cases (58.3% were ≥65 years old. The positive predictive values of Wells and revised Geneva scores were 65.8% and 32.4%, respectively (P < 0.05 in the elderly patients; the AUC for the Wells score and the revised Geneva score in elderly was 0.682 (95% confidence interval [CI]: 0.612-0.746 and 0.655 (95% CI: 0.584-0.722, respectively (P = 0.389. The negative predictive values of D-dimer, the Wells score combined with D-dimer, and the revised Geneva score combined with D-dimer were 93.7%, 100%, and 100% in the elderly, respectively. Conclusions: The diagnostic value of the Wells score was higher than the revised Geneva score for the elderly cases with suspected PE. The combination of either the Wells score or the revised Geneva score with a normal D-dimer concentration is a safe strategy to rule out PE.

  4. Transportation operations functions of the federal waste management system

    International Nuclear Information System (INIS)

    Shappert, L.B.; Klimas, M.J.

    1989-01-01

    This paper documents the functions that are necessary to operate the OCRWM transportation system. OCRWM's mission is to accept and transport spent fuel and high-level waste from waste generators to FWMS facilities. The emphasis is on transportation operations and assumes that all necessary facilities are in place and equipment designs and specifications are available to permit the system to operate properly. The information reported in this paper was developed for TOPO and is compatible with the draft revision of the Waste Management System Requirements and Description (SRD). 5 refs

  5. An internally validated prognostic model for success in revision stapes surgery for otosclerosis.

    Science.gov (United States)

    Wegner, Inge; Vincent, Robert; Derks, Laura S M; Rauh, Simone P; Heymans, Martijn W; Stegeman, Inge; Grolman, Wilko

    2018-03-09

    To develop a prediction model that can accurately predict the chance of success following revision stapes surgery in patients with recurrent or persistent otosclerosis at 2- to 6-months follow-up and to validate this model internally. A retrospective cohort study of prospectively gathered data in a tertiary referral center. The associations of 11 prognostic factors with treatment success were tested in 705 cases using multivariable logistic regression analysis with backward selection. Success was defined as a mean air-bone gap closure to 10 dB or less. The most relevant predictors were used to derive a clinical prediction rule to determine the probability of success. Internal validation by means of bootstrapping was performed. Model performance indices, including the Hosmer-Lemeshow test, the area under the receiver operating characteristics curve (AUC), and the explained variance were calculated. Success was achieved in 57.7% of cases at 2- to 6-months follow-up. Certain previous surgical techniques, primary causes of failure leading up to revision stapes surgery, and positions of the prosthesis placed during revision surgery were associated with higher success percentages. The clinical prediction rule performed moderately well in the original dataset (Hosmer-Lemeshow P = .78; AUC = 0.73; explained variance = 22%), which slightly decreased following internal validation by means of bootstrapping (AUC = 0.69; explained variance = 13%). Our study established the importance of previous surgical technique, primary cause of failure, and type of the prosthesis placed during the revision surgery in predicting the probability of success following stapes surgery at 2- to 6-months follow-up. 2b. Laryngoscope, 2018. © 2018 The American Laryngological, Rhinological and Otological Society, Inc.

  6. Revision of failed hemiarthroplasty for painful glenoid arthrosis to anatomic total shoulder arthroplasty.

    Science.gov (United States)

    Sheth, Mihir M; Sholder, Daniel; Abboud, Joseph; Lazarus, Mark D; Ramsey, Matthew L; Williams, Gerald R; Namdari, Surena

    2018-05-10

    The impending burden of revision shoulder arthroplasty has increased interest in outcomes of revision procedures. Painful glenoid arthrosis following hemiarthroplasty is a common cause of reoperation, and conversion to anatomic total shoulder arthroplasty is one option. We identified patients who underwent revision of painful hemiarthroplasty to total shoulder arthroplasty over a 15-year period in a single tertiary-care health system. Presurgical and operative data were analyzed for 28 patients who met the inclusion and exclusion criteria. Patients were contacted at a minimum of 2 years' follow-up after revision surgery for functional outcome scores, reoperations, and implant survival. The 2- and 5-year implant survival rates were 93% and 86%, respectively. Functional outcomes were obtained from 21 patients with surviving implants. The mean American Shoulder and Elbow Surgeons score, visual analog scale score for pain, and Single Assessment Numerical Evaluation score were 78 ± 20, 2.3 ± 2.6, and 71 ± 24, respectively. The mean Short Form 12 mental and physical scores were 49 ± 10 and 43 ± 9, respectively. Of the patients, 17 (81%) were either satisfied or very satisfied with their outcome. Complications were seen in 10 patients (36%), and 6 patients (21%) required reoperation. Anatomic total shoulder arthroplasty following hemiarthroplasty can achieve successful outcomes and implant survival rates. Given our poor understanding of reverse shoulder arthroplasty longevity, this procedure should remain an option for patients with glenoid arthrosis and an intact rotator cuff. Copyright © 2018 Journal of Shoulder and Elbow Surgery Board of Trustees. Published by Elsevier Inc. All rights reserved.

  7. Revised and enlarged edition: editorial production as an artistic and a literary genre

    Directory of Open Access Journals (Sweden)

    Sofia Gonçalves

    2016-07-01

    Full Text Available The appropriation of the expression «revised and enlarged edition», from the traditional publishing jargon, is presented in this article as a hypotheses to characterize contemporary publishing practices. It consid- ers the publication, in all its stages, as a writing space and as a process that never resigns creativity and criticism.These practices are «revised» (revisited because they imply the problematization of practice, through an exploratory attitude or critic, leading to processes and discourses prepared for a permanent review. And «en- larged» because they expand the operations of each editorial production phase, they iden- tify alternative formats and models, they blur traditional roles (author/editor/designer/ reader and question editing as a mere me- diation for the creation, circulation, reception or reading processes. In this article, we will identify some of the principles and emerging phenomena that help us understand editorial production as an artistic or a literary genre.

  8. On revision of definition of doses for radiation protection in ICRP 1990 recommendations

    International Nuclear Information System (INIS)

    Yoshizawa, Michio

    1995-01-01

    The recommendation of ICRP is to give the guideline to the organizations and experts concerned to radiation protection including regulatory authorities on the basic rule which becomes the basis of proper radiation protection, and the radiation protection in respective countries has been carried out, respecting this ICRP recommendation. In 1990, ICRP revised this basic recommendation, and published as Publication 60. In this 1990 recommendation, as the matters that give impact to the dose evaluation of external exposure, the introduction of the new concept of dose, namely radiation weighting factor and equivalent dose, the revision of radiation quality factor and so on are enumerated. As to the 1990 recommendation, absorbed dose and organ dose, radiation weighting factor, equivalent dose, effective dose, quality factor-LET relation, the summation with the former quantities and the operational quantity of ICRU are described. The reason why radiation weighting factor and equivalent dose were introduced are discussed, including the inference of the author. (K.I.)

  9. 30 CFR 285.617 - What activities require a revision to my SAP, and when will MMS approve the revision?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What activities require a revision to my SAP, and when will MMS approve the revision? 285.617 Section 285.617 Mineral Resources MINERALS MANAGEMENT...: (1) Designed not to cause undue harm or damage to natural resources; life (including human and...

  10. Acute cholecystitis: comparing clinical outcomes with TG13 severity and intended laparoscopic versus open cholecystectomy in difficult operative cases.

    Science.gov (United States)

    Gerard, Justin; Luu, Minh B; Poirier, Jennifer; Deziel, Daniel J

    2018-03-09

    The revised Tokyo Guidelines include criteria for determining the severity of acute cholecystitis with treatment algorithms based on severity. The aim of this study was to investigate the relationship of the revised Tokyo Guidelines severity grade to clinical outcomes of cholecystectomy for acute cholecystitis. We identified 66 patients with acute cholecystitis from a prior study of difficult cholecystectomy cases. We examined the relationship between severity grade and multiple variables related to perioperative and postoperative outcomes. A more severe revised Tokyo Guidelines grade was associated with a higher number of complications (p = 0.03) and a higher severity of complications (p = 0.01). Severity grade did not predict operative time, estimated blood loss, intensive care unit admission or length of stay. Compared to planned open cholecystectomy, intended laparoscopic cholecystectomy was associated with significantly fewer total and Clavien-Dindo grade 3 complications, fewer intensive care unit admissions, and shorter length of stay (p values range from 0.03 to < 0.0001). In technically difficult operations for acute cholecystitis, the revised Tokyo guidelines severity grade correlates with the number and severity of complications. However, intended performance of laparoscopic cholecystectomy rather than open cholecystectomy in difficult operations predicts broader beneficial outcomes than severity grade.

  11. Revision hip preservation surgery with hip arthroscopy: clinical outcomes.

    Science.gov (United States)

    Domb, Benjamin G; Stake, Christine E; Lindner, Dror; El-Bitar, Youseff; Jackson, Timothy J

    2014-05-01

    To analyze and report the clinical outcomes of a cohort of patients who underwent revision hip preservation with arthroscopy and determine predictors of positive and negative outcomes. During the study period from April 2008 to December 2010, all patients who underwent revision hip preservation with arthroscopy were included. This included patients who had previous open surgery and underwent revision with arthroscopy. Patient-reported outcome (PRO) scores were obtained preoperatively and at 3-month, 1-year, 2-year, and 3-year follow-up time points. Any revision surgeries and conversions to total hip arthroplasty were noted. A multiple regression analysis was performed to look for positive and negative predictive factors for improvement in PROs after revision hip arthroscopy. Forty-seven hips in 43 patients had completed 2 years' follow-up or needed total hip arthroplasty. The mean length of follow-up was 29 months (range, 24 to 47 months). Of the hips, 31 (66%) had either unaddressed or incompletely treated femoroacetabular impingement. There was a significant improvement in all PRO scores at a mean of 29 months after revision (P arthroscopy can achieve moderately successful outcomes and remains a viable treatment strategy after failed primary hip preservation surgery. Preoperative predictors of success after revision hip arthroscopy include segmental labral defects, unaddressed or incompletely addressed femoroacetabular impingement, heterotopic ossification, and previous open surgery. Level IV, therapeutic case series. Copyright © 2014 Arthroscopy Association of North America. Published by Elsevier Inc. All rights reserved.

  12. HEDR modeling approach: Revision 1

    International Nuclear Information System (INIS)

    Shipler, D.B.; Napier, B.A.

    1994-05-01

    This report is a revision of the previous Hanford Environmental Dose Reconstruction (HEDR) Project modeling approach report. This revised report describes the methods used in performing scoping studies and estimating final radiation doses to real and representative individuals who lived in the vicinity of the Hanford Site. The scoping studies and dose estimates pertain to various environmental pathways during various periods of time. The original report discussed the concepts under consideration in 1991. The methods for estimating dose have been refined as understanding of existing data, the scope of pathways, and the magnitudes of dose estimates were evaluated through scoping studies

  13. Process hazards analysis (PrHA) program, bridging accident analyses and operational safety

    International Nuclear Information System (INIS)

    Richardson, J.A.; McKernan, S.A.; Vigil, M.J.

    2003-01-01

    Recently the Final Safety Analysis Report (FSAR) for the Plutonium Facility at Los Alamos National Laboratory, Technical Area 55 (TA-55) was revised and submitted to the US. Department of Energy (DOE). As a part of this effort, over seventy Process Hazards Analyses (PrHAs) were written and/or revised over the six years prior to the FSAR revision. TA-55 is a research, development, and production nuclear facility that primarily supports US. defense and space programs. Nuclear fuels and material research; material recovery, refining and analyses; and the casting, machining and fabrication of plutonium components are some of the activities conducted at TA-35. These operations involve a wide variety of industrial, chemical and nuclear hazards. Operational personnel along with safety analysts work as a team to prepare the PrHA. PrHAs describe the process; identi fy the hazards; and analyze hazards including determining hazard scenarios, their likelihood, and consequences. In addition, the interaction of the process to facility systems, structures and operational specific protective features are part of the PrHA. This information is rolled-up to determine bounding accidents and mitigating systems and structures. Further detailed accident analysis is performed for the bounding accidents and included in the FSAR. The FSAR is part of the Documented Safety Analysis (DSA) that defines the safety envelope for all facility operations in order to protect the worker, the public, and the environment. The DSA is in compliance with the US. Code of Federal Regulations, 10 CFR 830, Nuclear Safety Management and is approved by DOE. The DSA sets forth the bounding conditions necessary for the safe operation for the facility and is essentially a 'license to operate.' Safely of day-to-day operations is based on Hazard Control Plans (HCPs). Hazards are initially identified in the PrI-IA for the specific operation and act as input to the HCP. Specific protective features important to worker

  14. A reliability analysis of the revised competitiveness index.

    Science.gov (United States)

    Harris, Paul B; Houston, John M

    2010-06-01

    This study examined the reliability of the Revised Competitiveness Index by investigating the test-retest reliability, interitem reliability, and factor structure of the measure based on a sample of 280 undergraduates (200 women, 80 men) ranging in age from 18 to 28 years (M = 20.1, SD = 2.1). The findings indicate that the Revised Competitiveness Index has high test-retest reliability, high inter-item reliability, and a stable factor structure. The results support the assertion that the Revised Competitiveness Index assesses competitiveness as a stable trait rather than a dynamic state.

  15. Nuclear safety guide TID-7016 Revision 2

    International Nuclear Information System (INIS)

    Thomas, J.T.

    1980-01-01

    The present revision of TID-7016 Nuclear Safety Guide is discussed. This Guide differs significantly from its predecessor in that the latter was intentionally conservative in its recommendations. Firmly based on experimental evidence of criticality, the original Guide and the first revision were considered to be of most value to organizations whose activities with fissionable materials were not extensive and, secondarily, that it would serve as a point of departure for members of established nuclear safety teams, experienced in the field. The reader will find a significant change in the character of information presented in this version. Nuclear Criticality Safety has matured in the past twelve years. The advance of calculational capability has permitted validated calculations to extend and substitute for experimental data. The broadened data base has enabled better interpolation, extension, and understanding of available, information, especially in areas previously addressed by undefined but adequate factors of safety. The content has been thereby enriched in qualitative guidance. The information inherently contains, and the user can recapture, the quantitative guidance characteristic of the former Guides by employing appropriate safety factors. In fact, it becomes incumbent on the Criticality Safety Specialist to necessarily impose safety factors consistent with the possible normal and abnormal credible contingencies of an operation as revealed by his evaluation. In its present form the Guide easily becomes a suitable module in any compendium or handbook tailored for internal use by organizations. It is hoped the Guide will continue to serve immediate needs and will encourage continuing and more comprehensive efforts toward organizing nuclear criticality safety information

  16. [Quality in Revision Arthroplasty: A Comparison between Claims Data Analysis and External Quality Assurance].

    Science.gov (United States)

    Wessling, M; Gravius, S; Gebert, C; Smektala, R; Günster, C; Hardes, J; Rhomberg, I; Koller, D

    2016-02-01

    External quality assurance for revisions of total knee arthroplasty (TKA) and total hip arthroplasty (THA) are carried out through the AQUA institute in Germany. Data are collected by the providers and are analyzed based on predefined quality indicators from the hospital stay in which the revision was performed. The present study explores the possibility to add routine data analysis to the existing external quality assurance (EQS). Differences between methods are displayed. The study aims to quantify the benefit of an additional analysis that allows patients to be followed up beyond the hospitalization itself. All persons insured in an AOK sickness fund formed the population for analysis. Revisions were identified using the same algorithm as the existing external quality assurance. Adverse events were defined according to the AQUA indicators for the years 2008 to 2011.The hospital stay in which the revision took place and a follow-up of 30 days were included. For re-operation and dislocation we also defined a 365 days interval for additional follow-up. The results were compared to the external quality control reports. Almost all indicators showed higher events in claims data analysis than in external quality control. Major differences are seen for dislocation (EQS SD: 1.87 vs. claims data [cd] SD: 2.06 %, cd+30 d: 2.91 %, cd+365 d: 7.27 %) and reoperation (hip revision: EQS SD: 5.88 % vs. claims data SD: 8.79 % cd+30 d: 9.82 %, cd+365 d: 15.0 %/knee revision: EQS SD: 3.21 % vs. claims data SD: 4.07 %, cd+30 d: 4.6 %, cd+365 d: 15.43 %). Claims data could show additional adverse events for all indicators after the initial hospital stay, rising to 77 % of all events. The number of adverse events differs between the existing external quality control and our claims data analysis. Claims data give the opportunity to complement existing methods of quality control though a longer follow-up, when many complications become evident. Georg

  17. Proposals for a revision and amendment of the 'Guide for the examination of control room personnel of nuclear power plants, technical and expert knowledge required'

    International Nuclear Information System (INIS)

    Frisch, W.; Kersting, E.; Meissner, R.; Mester, W.; Richter, H.; Weber, J.P.

    1983-01-01

    a) Proposals are presented for amending the Guide in section 5 and 6 (Table I and II) and in the Annex (Examples of problems and answers), relating to three special subjects, namely: Thermohydraulics; Methods and procedures of analyzing the current operational state of a plant in case of incidents, malfunction failure indication; Plant operational performance and behaviour in cases exceeding design limits (especially analysis and counter-measures in case of reactor core damage, general behaviour in critical situations). b) Revision of all examples of problems to be put in examinations, and of the answers, as given in the Annex. Revision with regard to correctness and balanced distribution of difficulty of problems to be put in the various subject fields, and with regard to correctness of answers. This revision shall include an examination of the problems for their suitability to show the candidate's efficiency in diagnosis, prognosis and appropriate action. c) Proposals for amending and improving the Guide, resulting from an evaluation of the results and the experience gained in previous examinations. (orig.) [de

  18. Revision hip arthroplasty by Waldemar Link custom-made total hip prosthesis

    Directory of Open Access Journals (Sweden)

    Medenica Ivica

    2010-01-01

    Full Text Available Background. The number of patients undergoing hip arthroplasty revision is constantly growing. Especially, complex problem is extensive loss of bone stock and pelvic discontinuity that requires reconstruction. Case report. The paper presented a 50-year old patient, who ten years ago underwent a total cement artrhroplasty of the left hip. A year after the primary operation the patient had difficulties in walking without crutches. Problems intensified in the last five years, the patient had severe pain, totally limited movement in the left hip and could not walk at all. Radiographically, we found loose femoral component, massive loss of bone stock of proximal femur, acetabular protrusion and a consequent pelvic discontinuity. Clinically, a completely disfunctional left hip joint was registered (Harris hip score - 7.1. We performed total rearthroplasty by a custom- made Waldemar Link total hip prosthesis with acetabular antiprotrusio cage and compensation of bone defects with a graft from the bone bank. A year after the operation, we found clinically an extreme improvement in Harris hip score - 87.8. Radiographically, we found stability of implanted components, a complete graft integration and bone bridging across the site of pelvic discontinuity. Conclusion. Pelvic discontinuity and massive loss of proximal femoral bone stock is a challenging and complex entity. Conventional prostheses cannot provide an adequate fixation and stability of the hip. Application of custom-made prosthesis (measured specifically for a patient and additional alografting bone defects is a good method in revision surgery after unsuccessful hip arthroplasty with extensive bone defects.

  19. Issues regarding the design and acceptance of intelligent support systems for reactor operators

    International Nuclear Information System (INIS)

    Bernard, J.A.

    1992-01-01

    In this paper, factors relevant to the design and acceptance of intelligent support systems for the operation of nuclear power plants are enumerated and discussed. The central premise is that conventional expert systems which encode experiential knowledge in production rules are not a suitable vehicle for the creation of practical operator support systems. The principal difficulty is the need for real-time operation. This in turn means that intelligent support systems will have knowledge bases derived from temporally accurate plant models, inference engines that permit revisions in the search process so as to accommodate revised or new data, and man-machine interfaces that do not require any human input. Such systems will have to be heavily instrumented and the associated knowledge bases will require a hierarchical organization so as to emulate human approaches to analysis. Issues related to operator acceptance of intelligent support tools are then reviewed. Possible applications are described and the relative merits of the machine- and human-centered approaches to the implementation of intelligent support systems are enumerated. The paper concludes with a plea for additional experimental evaluations

  20. Descriptive epidemiology of the Multicenter ACL Revision Study (MARS) cohort.

    Science.gov (United States)

    Wright, Rick W; Huston, Laura J; Spindler, Kurt P; Dunn, Warren R; Haas, Amanda K; Allen, Christina R; Cooper, Daniel E; DeBerardino, Thomas M; Lantz, Brett Brick A; Mann, Barton J; Stuart, Michael J

    2010-10-01

    Revision anterior cruciate ligament (ACL) reconstruction has worse outcomes than primary reconstructions. Predictors for these worse outcomes are not known. The Multicenter ACL Revision Study (MARS) Group was developed to perform a multisurgeon, multicenter prospective longitudinal study to obtain sufficient subjects to allow multivariable analysis to determine predictors of clinical outcome. To describe the formation of MARS and provide descriptive analysis of patient demographics and clinical features for the initial 460 enrolled patients to date in this prospective cohort. Cross-sectional study; Level of evidence, 2. After training and institutional review board approval, surgeons began enrolling patients undergoing revision ACL reconstruction, recording patient demographics, previous ACL reconstruction methods, intra-articular injuries, and current revision techniques. Enrolled subjects completed a questionnaire consisting of validated patient-based outcome measures. As of April 1, 2009, 87 surgeons have enrolled a total of 460 patients (57% men; median age, 26 years). For 89%, the reconstruction was the first revision. Mode of failure as deemed by the revising surgeon was traumatic (32%), technical (24%), biologic (7%), combination (37%), infection (MARS Group has been able to quickly accumulate the largest revision ACL reconstruction cohort reported to date. Traumatic reinjury is deemed by surgeons to be the most common single mode of failure, but a combination of factors represents the most common mode of failure. Allograft graft choice is more common in the revision setting than autograft. Concomitant knee injury is extremely common in this population.

  1. Letter of Map Revision

    Data.gov (United States)

    Earth Data Analysis Center, University of New Mexico — The National Flood Hazard Layer (NFHL) data incorporates all Digital Flood Insurance Rate Map(DFIRM) databases published by FEMA, and any Letters Of Map Revision...

  2. Revision without ordinals

    NARCIS (Netherlands)

    Rivello, Edoardo

    2013-01-01

    We show that Herzberger’s and Gupta’s revision theories of truth can be recast in purely inductive terms, without any appeal neither to the transfinite ordinal numbers nor to the axiom of Choice. The result is presented in an abstract and general setting, emphasising both its validity for a wide

  3. Financially troubled El Paso discontinues more nonutility operations

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    As part of a plan to phase out its nonutility businesses, El Paso Electric Company will discontinue its remaining PascoTex Corporation operations, consisting of the manufacture of specialty steel products, and company management released revised estimates of losses to be incurred during the disposal period. Recently El Paso announced it would also bow out of most of its nonutility real estate operations. Increased operating expenses, principally at El Paso's Palo Verde station nuclear facility, have also impacted the bottom line. All three units at Palo Verde were out of service at the time of this writing. The good news was that energy sales have increased

  4. Smoking is associated with earlier time to revision of total knee arthroplasty.

    Science.gov (United States)

    Lim, Chin Tat; Goodman, Stuart B; Huddleston, James I; Harris, Alex H S; Bhowmick, Subhrojyoti; Maloney, William J; Amanatullah, Derek F

    2017-10-01

    Smoking is associated with early postoperative complications, increased length of hospital stay, and an increased risk of revision after total knee arthroplasty (TKA). However, the effect of smoking on time to revision TKA is unknown. A total of 619 primary TKAs referred to an academic tertiary center for revision TKA were retrospectively stratified according to the patient smoking status. Smoking status was then analyzed for associations with time to revision TKA using a Chi square test. The association was also analyzed according to the indication for revision TKA. Smokers (37/41, 90%) have an increased risk of earlier revision for any reason compared to non-smokers (274/357, 77%, p=0.031). Smokers (37/41, 90%) have an increased risk of earlier revision for any reason compared to ex-smokers (168/221, 76%, p=0.028). Subgroup analysis did not reveal a difference in indication for revision TKA (p>0.05). Smokers are at increased risk of earlier revision TKA when compared to non-smokers and ex-smokers. The risk for ex-smokers was similar to that of non-smokers. Smoking appears to have an all-or-none effect on earlier revision TKA as patients who smoked more did not have higher risk of early revision TKA. These results highlight the need for clinicians to urge patients not to begin smoking and encourage smokers to quit smoking prior to primary TKA. Copyright © 2017 Elsevier B.V. All rights reserved.

  5. Hanford Site technical baseline database. Revision 1

    International Nuclear Information System (INIS)

    Porter, P.E.

    1995-01-01

    This report lists the Hanford specific files (Table 1) that make up the Hanford Site Technical Baseline Database. Table 2 includes the delta files that delineate the differences between this revision and revision 0 of the Hanford Site Technical Baseline Database. This information is being managed and maintained on the Hanford RDD-100 System, which uses the capabilities of RDD-100, a systems engineering software system of Ascent Logic Corporation (ALC). This revision of the Hanford Site Technical Baseline Database uses RDD-100 version 3.0.2.2 (see Table 3). Directories reflect those controlled by the Hanford RDD-100 System Administrator. Table 4 provides information regarding the platform. A cassette tape containing the Hanford Site Technical Baseline Database is available

  6. Publishing and Revising Content

    Science.gov (United States)

    Editors and Webmasters can publish content without going through a workflow. Publishing times and dates can be set, and multiple pages can be published in bulk. Making an edit to published content created a revision.

  7. Development and Psychometric Validation of the Family Outcomes Survey-Revised

    Science.gov (United States)

    Bailey, Donald B., Jr.; Raspa, Melissa; Olmsted, Murrey G.; Novak, Scott P.; Sam, Ann M.; Humphreys, Betsy P.; Nelson, Robin; Robinson, Nyle; Guillen, Chelsea

    2011-01-01

    Few psychometrically valid scales exist to assess family outcomes and the helpfulness of early intervention. This article describes the development and psychometric properties of the Family Outcomes Survey-Revised. The revision was prompted by the need to (a) create a new format that would be easier for parents to understand, (b) revise and expand…

  8. Nuclear fuel reprocessing deactivation plan for the Idaho Chemical Processing Plant, Revision 1

    International Nuclear Information System (INIS)

    Patterson, M.W.

    1994-10-01

    The decision was announced on April 28, 1992 to cease all United States Department of Energy (DOE) reprocessing of nuclear fuels. This decision leads to the deactivation of all fuels dissolution, solvent extraction, krypton gas recovery operations, and product denitration at the Idaho Chemical Processing Plant (ICPP). The reprocessing facilities will be converted to a safe and stable shutdown condition awaiting future alternate uses or decontamination and decommissioning (D ampersand D). This ICPP Deactivation Plan includes the scope of work, schedule, costs, and associated staffing levels necessary to achieve a safe and orderly deactivation of reprocessing activities and the Waste Calcining Facility (WCF). Deactivation activities primarily involve shutdown of operating systems and buildings, fissile and hazardous material removal, and related activities. A minimum required level of continued surveillance and maintenance is planned for each facility/process system to ensure necessary environmental, health, and safety margins are maintained and to support ongoing operations for ICPP facilities that are not being deactivated. Management of the ICPP was transferred from Westinghouse Idaho Nuclear Company, Inc. (WINCO) to Lockheed Idaho Technologies Company (LITCO) on October 1, 1994 as part of the INEL consolidated contract. This revision of the deactivation plan (formerly the Nuclear Fuel Reprocessing Phaseout Plan for the ICPP) is being published during the consolidation of the INEL site-wide contract and the information presented here is current as of October 31, 1994. LITCO has adopted the existing plans for the deactivation of ICPP reprocessing facilities and the plans developed under WINCO are still being actively pursued, although the change in management may result in changes which have not yet been identified. Accordingly, the contents of this plan are subject to revision

  9. Evaluation of the revised training program for senior control room staff: science fundamentals and equipment principles

    International Nuclear Information System (INIS)

    Jervis, R.E.; Evans, G.J.

    1996-10-01

    Canadian nuclear utilities have formed an Inter-Utility Working Group to revise their program for training nuclear generating station senior control room staff, namely Control Room Operators and Shift Supervisors, in Science Fundamentals and Equipment Principles. This report documents the findings of an external review of this revision process, addressing, amongst other topics, the process of revision undertaken by the Working Group, their outline of topics to be included, and, the pertinence and comprehensiveness of the detailed training objectives identified for two of the courses. The approach to revising the program being followed by the Working Group appears to be reasonable insomuch that some training needs have been identified and used to construct detailed sets of training objectives. However, as assessed by the consultants without full documentation being available, some important steps appear to have been missed. Specifically, much of the basis of the revision process has not been documented, neither has the approach selected for the revision process, nor has any justification for not performing a CANDU specific job and task analysis been offered. Furthermore, the Working Group has not yet proposed any criteria for evaluation of the program or provided any test items. As a result, the consultants have had to develop criteria for evaluation of the overall program and of individual courses. These criteria were applied in a more detailed review of the training objectives for two particular courses: Plant Chemistry, and Nuclear Physics and Reactor Theory. Many of the training objectives for these courses were found to be too qualitative or ones that require trainees to memorize blocks of information rather than develop in them an ability to arrive at conclusions about scientific phenomena using principles and reasoning. This assessment indicates that the training objectives are designed to achieve too low a level of cognition, inconsistent with developing an

  10. The design of intelligent support systems for nuclear reactor operators

    International Nuclear Information System (INIS)

    Bernard, J.A.

    1992-01-01

    This paper identifies factors relevant to the design of intelligent support systems and their use for the provision of real-time diagnostic information. As such, it constitutes a followup to the state-of-the-art review that was previously published by Bernard and Washio on the utilization of expert systems within the nuclear industry. Some major differences between intelligent-support tools and conventional expert systems are enumerated. In summary, conventional expert systems that encode experimental knowledge in production rules are not suitable vehicle for the creation of operator support systems. The principal difficulty is the need for real-time operation. This in turn means that intelligent support systems will have knowledge bases derived from temporally accurate plant models, inference engines that permit revisions in the search process to accommodate revised data, and man-machine interfaces that do not require any human input. Such systems will be heavily instrumented, and the associated knowledge bases will require a hierarchical organization to emulate human approaches to analysis

  11. IAEA technical co-operation and the NPT

    International Nuclear Information System (INIS)

    Velez Ocon, C.

    1985-01-01

    The IAEA technical co-operation programme promotes nuclear techniques and technologies in the developing countries. The Statute, the NPT, and the Revised Guiding Principles all reflect the desire of countries to foster an international climate where it will be unacceptable for a non-nuclear-weapon State to indulge in the development of military nuclear technology and reprehensible for States possessing this technology to offer it to others

  12. 77 FR 71129 - Revisions to the California State Implementation Plan, San Joaquin Valley United Air Pollution...

    Science.gov (United States)

    2012-11-29

    ...EPA is finalizing approval of revisions to the SJVUAPCD and SCAQMD portion of the California State Implementation Plan (SIP). This action was proposed in the Federal Register on June 21, 2012 and concerns volatile organic compound (VOC) emissions from chipping and grinding activities, and composting operations. We are approving local rules that regulate these emission sources under the Clean Air Act (CAA or the Act).

  13. Age and Early Revision After Primary Total Hip Arthroplasty for Osteoarthritis.

    Science.gov (United States)

    Meyer, Zachary; Baca, Geneva; Rames, Richard; Barrack, Robert; Clohisy, John; Nam, Denis

    2017-11-01

    Prior reports have noted an increased risk of early revision among younger patients undergoing total hip arthroplasty (THA) but have been confounded by the inclusion of various diagnoses. The purpose of this study was to assess the revision rate and the time to revision for patients undergoing THA for osteoarthritis based on age. Patients with a diagnosis of osteoarthritis who underwent both primary and revision THA at the same institution were identified. The time between primary and revision surgery and the indication for revision were collected. Patients were stratified into 2 groups based on age at the time of primary THA: 64 years or younger (group 1) or 65 years or older (group 2). Between 1996 and 2016, a total of 4662 patients (5543 hips) underwent primary THA for a diagnosis of osteoarthritis. Of these, 100 patients (104 hips) received a revision THA (62 in group 1 and 42 in group 2). Mean age was 52.7±8.4 years in group 1 vs 73.4±6.3 years in group 2 (Pprimary to revision surgery was 3.0±3.2 years for group 1 and 1.1±2.1 years for group 2 (P=.001). Among patients undergoing primary THA for a diagnosis of osteoarthritis, younger age is not associated with an increased rate of early failure or revision. [Orthopedics. 2017; 40(6):e1069-e1073.]. Copyright 2017, SLACK Incorporated.

  14. Revision washout decreases implant capsule tissue culture positivity: a multicenter study.

    Science.gov (United States)

    Henry, Gerard D; Carson, Culley C; Wilson, Steven K; Wiygul, Jeremy; Tornehl, Chris; Cleves, Mario A; Simmons, Caroline J; Donatucci, Craig F

    2008-01-01

    Positive cultures, visible biofilm and confocal micrography confirm bacterial presence on clinically uninfected inflatable penile prostheses at revision surgery. Salvage irrigation has been proved to rescue patients with clinically infected inflatable penile prostheses. Similar washout at revision for noninfectious reasons significantly lowers subsequent infection rates. We investigated a larger series of patients for positive culture rates and evaluated implant capsule tissue culture rates before and after revision washout. At 4 institutions a total of 148 patients with inflatable penile prostheses underwent revision surgery for noninfectious reasons between June 2001 and September 2005. Swab cultures of the fluid around the pump and visible biofilm were obtained. Also, in 65 patients a wedge of tissue from the capsule that forms around the pump was cultured. After implant removal revision washout of the implant spaces was performed and a second wedge of tissue was cultured. Of the 148 patients 97 (66%) had positive bacterial swab cultures of the fluid around the pump or biofilm. A total of 124 isolates were cultured. Of the 65 implant capsule tissue cultures obtained before washout 28 (43%) were positive for bacteria, while 16 (25%) obtained after revision washout were positive. Positive cultures and visible bacterial biofilm are present on clinically uninfected inflatable penile prostheses at revision surgery in most patients. Revision washout appears to decrease the bacterial load on implant capsule tissue at revision surgery of inflatable penile prostheses for noninfectious reasons.

  15. RCBI-II: The Second Revision of the Revised Cyber Bullying Inventory

    Science.gov (United States)

    Topcu, Çigdem; Erdur-Baker, Özgür

    2018-01-01

    The aim of this study is to update the Turkish version of the Revised Cyber Bullying Inventory (RCBI) and eliminate specific technology names. Validity and reliability tests were carried out with 1,803 high school students. The updated version of the RCBI yields valid and reliable scores measuring cyberbullying and victimization.

  16. DOC/WSNSO [Department of Commerce/Weather Service Nuclear Support Office] operational support to Federal Radiological Monitoring and Assessment Center

    International Nuclear Information System (INIS)

    Mueller, P.

    1989-01-01

    The National Weather Service (NWS) is an agency of the Department of Commerce. The NWS has hundreds of weather offices throughout the United States. The Weather Service Nuclear Support Office (WSNSO) is a highly specialized unit of NWS that provides direct support to the U.S. Department of Energy's (DOE's) underground nuclear testing program. The WSNSO has been associated with the DOE for >33 yr. As a result of the unique relationship with the DOE, all WSNSO emergency response meteorologists and meteorological technicians are allowed access to classified material. Meteorological phenomena play a significant role during a Federal Radiological Monitoring and Assessment Center (FRMAC) event, and WSNSO meteorologists provide direct support to ARAC. The marriage of state-of-the-art computer systems together with proven technology provides the on-scene WSNSO meteorologist with essentially a portable fully equipped, fully functional, advanced NWS weather station. The WSNSO's emergency response personnel and hardware are at the ready and can be mobilized within 2 h. WSNSO can provide on-scene weather forecasts and critical weather data collection whenever and wherever necessary

  17. Postoperative pain outcomes after transvaginal mesh revision.

    Science.gov (United States)

    Danford, Jill M; Osborn, David J; Reynolds, W Stuart; Biller, Daniel H; Dmochowski, Roger R

    2015-01-01

    Although the current literature discusses mesh complications including pain, as well as suggesting different techniques for removing mesh, there is little literature regarding pain outcomes after surgical removal or revision. The purpose of this study is to determine if surgical removal or revision of vaginal mesh improves patient's subjective complaints of pelvic pain associated with original placement of mesh. After obtaining approval from the Vanderbilt University Medical Center Institutional Review Board, a retrospective review of female patients with pain secondary to previous mesh placement who underwent excision or revision of vaginal mesh from January 2000 to August 2012 was performed. Patient age, relevant medical history including menopause status, previous hysterectomy, smoking status, and presence of diabetes, fibromyalgia, interstitial cystitis, and chronic pelvic pain, was obtained. Patients' postoperative pain complaints were assessed. Of the 481 patients who underwent surgery for mesh revision, removal or urethrolysis, 233 patients met our inclusion criteria. One hundred and sixty-nine patients (73 %) reported that their pain improved, 19 (8 %) reported that their pain worsened, and 45 (19 %) reported that their pain remained unchanged after surgery. Prior history of chronic pelvic pain was associated with increased risk of failure of the procedure to relieve pain (OR 0.28, 95 % CI 0.12-0.64, p = 0.003). Excision or revision of vaginal mesh appears to be effective in improving patients' pain symptoms most of the time. Patients with a history of chronic pelvic pain are at an increased risk of no improvement or of worsening pain.

  18. Revised cost savings estimate with uncertainty for enhanced sludge washing of underground storage tank waste

    International Nuclear Information System (INIS)

    DeMuth, S.

    1998-01-01

    Enhanced Sludge Washing (ESW) has been selected to reduce the amount of sludge-based underground storage tank (UST) high-level waste at the Hanford site. During the past several years, studies have been conducted to determine the cost savings derived from the implementation of ESW. The tank waste inventory and ESW performance continues to be revised as characterization and development efforts advance. This study provides a new cost savings estimate based upon the most recent inventory and ESW performance revisions, and includes an estimate of the associated cost uncertainty. Whereas the author's previous cost savings estimates for ESW were compared against no sludge washing, this study assumes the baseline to be simple water washing which more accurately reflects the retrieval activity along. The revised ESW cost savings estimate for all UST waste at Hanford is $6.1 B ± $1.3 B within 95% confidence. This is based upon capital and operating cost savings, but does not include development costs. The development costs are assumed negligible since they should be at least an order of magnitude less than the savings. The overall cost savings uncertainty was derived from process performance uncertainties and baseline remediation cost uncertainties, as determined by the author's engineering judgment

  19. Photon beam properties at the European XFEL (December 2010 revision)

    Energy Technology Data Exchange (ETDEWEB)

    Schneidmiller, E.A.; Yurkov, M.V.

    2011-09-15

    A new set of baseline parameters of the electron beam and undulator for the European XFEL project has been defined recently. Changes refer to the electron beam emittance, charge, operation at different electron energies, and change of undulator period. According to the present concept, it is planned to vary charge from 20 pC to 1 nC allowing control of the FWHM radiation pulse duration. Operation at different electron energies of 17.5 GeV, 14 GeV, and 10.5 GeV will allow extension of the wavelength range to longer wavelengths. Electron bunches with different charges possess different properties. These features have an impact on photon beam properties which should be taken into account at the design stage optical beamlines and instruments and planning user experiments. In this note we present an overview of the radiation properties generated by SASE FEL radiators driven by electron beam with revised baseline parameters. (orig.)

  20. [The Use of Jumbo Cups in Revision Total Hip Arthroplasty].

    Science.gov (United States)

    von Roth, Philipp; Wassilew, Georgi I

    2017-10-01

    Extra-large uncemented jumbo cups are among the most common methods of acetabular revision. Jumbo cups do not contribute to bone stock restoration, and in the case of a subsequent revision, an even larger bone defect is to be expected. Thus, understanding long-term survival is essential. The present article discusses the literature relevant to this topic and addresses technical and implant-specific characteristics of jumbo cups. In summary, jumbo cups show an acceptable long-term survival rate, with aseptic loosening as the most common reason for revision and dislocation being the most common complication. Through the development of alternative revision systems, jumbo cups have lost their importance in today's practice. However, they can serve as a benchmark for studies of newer technologies in revision total hip arthroplasty. Georg Thieme Verlag KG Stuttgart · New York.

  1. Update and revision of WHO air quality guidelines for Europe

    Energy Technology Data Exchange (ETDEWEB)

    Younes, M. [WHO European Centre for Environment and Health, Bilthoven (Netherlands). Bilthoven Div.

    1995-12-31

    The WHO Air Quality Guidelines for Europe (AQG), published in 1987, have provided a uniform basis for the development of strategies for the control of air pollution, and have contributed to the maintenance and improvement of public health in several countries. The aim of the guidelines is to provide a basis for protecting public health from adverse effects of air pollutants, and for eliminating or reducing to a minimum, those contaminants that are known or likely to be hazardous to human health and wellbeing. Since the publication of the first edition of the AQG, new scientific data in the fields of air pollution toxicology and epidemiology have accumulated and new developments in risk assessment methodologies have taken place, requiring updating and/or revision of the existing guidelines. This fact was recognized during the preparation of the initial work plan of the European Centre for Environment and Health, and it was recommended that the Centre undertake any necessary amendments and extensions to the Air Quality Guidelines. The updating procedure is being carried out in cooperation with the International Programme on Chemical Safety (IPCS) and the Commission of the European Communities (CEC) and will be implemented through working group meetings which require the preparation of working documents on specific air pollutants or mixtures and a final consultation to discuss the updated document.It was initiated by a Planning Meeting which was organized in January 1993. The purpose of the planning meeting was to set the framework for the updating and revision process, in particular to discuss the scope and purpose, the contents and the format of the revised AQG publication, to define the details of and the time schedule for the updating process and to identify the working groups needed and their way of operation. (author)

  2. Update and revision of WHO air quality guidelines for Europe

    Energy Technology Data Exchange (ETDEWEB)

    Younes, M [WHO European Centre for Environment and Health, Bilthoven (Netherlands). Bilthoven Div.

    1996-12-31

    The WHO Air Quality Guidelines for Europe (AQG), published in 1987, have provided a uniform basis for the development of strategies for the control of air pollution, and have contributed to the maintenance and improvement of public health in several countries. The aim of the guidelines is to provide a basis for protecting public health from adverse effects of air pollutants, and for eliminating or reducing to a minimum, those contaminants that are known or likely to be hazardous to human health and wellbeing. Since the publication of the first edition of the AQG, new scientific data in the fields of air pollution toxicology and epidemiology have accumulated and new developments in risk assessment methodologies have taken place, requiring updating and/or revision of the existing guidelines. This fact was recognized during the preparation of the initial work plan of the European Centre for Environment and Health, and it was recommended that the Centre undertake any necessary amendments and extensions to the Air Quality Guidelines. The updating procedure is being carried out in cooperation with the International Programme on Chemical Safety (IPCS) and the Commission of the European Communities (CEC) and will be implemented through working group meetings which require the preparation of working documents on specific air pollutants or mixtures and a final consultation to discuss the updated document.It was initiated by a Planning Meeting which was organized in January 1993. The purpose of the planning meeting was to set the framework for the updating and revision process, in particular to discuss the scope and purpose, the contents and the format of the revised AQG publication, to define the details of and the time schedule for the updating process and to identify the working groups needed and their way of operation. (author)

  3. A logic scheme for regulating safe operation of research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Ahmad, E E [Reactor Department, Nuclear Research Center, Atomic Energy Authority, Cairo (Egypt); Effat, A; Rahman, F A [Operational Saety Dept, National Center of Nuclear Safety and Radiation Control Atomic Energy Authority, Cairo (Egypt)

    1997-12-31

    This investigation presents a logic scheme for regulating the safe operation of research reactor in accordance with the new revision of SS-35 and revised by the 10 CFR. It emphasizes the regulatory inspection and enforcement (RI end E) during the reactor operation phase. IT is developed to provide information, guidance and recommendations to be taken when constructing the RI and E program that could be applied to the operational phase of the egyptian Research Reactors. In the operational phase, the regulatory inspection (RI) means an examination, observation, measurement, or test undertaken or on behalf of the nuclear regulatory body (NRB) during operation to verify that the nuclear materials, components, systems and structures as well operational activities, processes, procedures and personnel competence and performance are in accordance with the requirements established or the provisions approved by NRB or specified in the operational license or contained in regulations. Regulatory inspection includes both routine and non-routine ones. Any of them may be announced or unannounced. The problems identified by the RI must be resolved by the proper RE actions. The RE actions include investigative and corrective RE actions. These RI and E procedures for regulating safe operation of research reactors are presented as flow charts and then developed as a computer logic scheme. The software program is very efficient, very friendly, very simple and is interactive in nature such that the program asks the user certain questions about essential steps that guide the (RI and E) for research reactors, and user responds. The program proceeds based on this response until all the necessary steps for (RI and E) are accomplished. 5 figs.

  4. Cement-in-cement acetabular revision with a constrained tripolar component.

    Science.gov (United States)

    Leonidou, Andreas; Pagkalos, Joseph; Luscombe, Jonathan

    2012-02-17

    Dislocation of a total hip replacement (THR) is common following total hip arthroplasty (THA). When nonoperative management fails to maintain reduction, revision surgery is considered. The use of constrained acetabular liners has been extensively described. Complete removal of the old cement mantle during revision THA can be challenging and is associated with significant complications. Cement-in-cement revision is an established technique. However, the available clinical and experimental studies focus on femoral stem revision. The purpose of this study was to present a case of cement-in-cement acetabular revision with a constrained component for recurrent dislocations and to investigate the current best evidence for this technique. This article describes the case of a 74-year-old woman who underwent revision of a Charnley THR for recurrent low-energy dislocations. A tripolar constrained acetabular component was cemented over the primary cement mantle following removal of the original liner by reaming, roughening the surface, and thoroughly irrigating and drying the primary cement. Clinical and radiological results were good, with the Oxford Hip Score improving from 11 preoperatively to 24 at 6 months postoperatively. The good short-term results of this case and the current clinical and biomechanical data encourage the use of the cement-in-cement technique for acetabular revision. Careful irrigation, drying, and roughening of the primary surface are necessary. Copyright 2012, SLACK Incorporated.

  5. The creation and operation of the European Mutual Association for Nuclear Insurance - EMANI

    International Nuclear Information System (INIS)

    Van Gulck, M.A.

    1980-03-01

    This general survey of the evolution of the nuclear operator's liability, with reference to the revision of the Paris Convention and the Brussels Supplementary Convention, describes the context in which the European Mutual Association for Nuclear Insurance (EMANI) was created and its operation. The author considers the repercussions of the European operator's increased liability on the nuclear insurance pool market and the consequences of the Three Mile Island accident for property damage insurance. (NEA) [fr

  6. 14 CFR 152.323 - Budget revision: Airport development.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Budget revision: Airport development. 152... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Accounting and Reporting Requirements § 152.323 Budget... change in the budget estimates, the sponsor shall submit a request for budget revision on a form...

  7. Pending revisions to ANS 56.8-81 containment systems leakage testing requirements

    International Nuclear Information System (INIS)

    Brown, T.M.

    1986-01-01

    The US Nuclear Regulatory Commission is currently processing a revision to Appendix J of Part 50, Title 10 of the Code of Federal Regulations. The revised Appendix J will not reference any ANSI standard. Processed concurrently with the revised Appendix J is a draft Regulatory Guide which does endorse ANS Standard 56.8. The draft Regulatory Guide currently takes many exceptions to the Standard. Many of the exceptions are changes the Working Group had in process and the exceptions are to bring the draft Regulatory Guide in line with the future Standard. The Working Group has completed their revisions to the Standard and its appendices. These revisions have been submitted to the Nuclear Power Plants Standards Committee (NUPPSCO). The NUPPSCO comments have recently been addressed by the Working Group and the Working Group response has been sent to the NUPPSCO commentators. This paper will discuss the revisions made to the Standard, the significance of the revisions and future tasks or Standard revisions which the ANS 56.8 Working Group may address

  8. Comparing contemporary revision burden among hip and knee joint replacement registries

    Directory of Open Access Journals (Sweden)

    Brian J. McGrory, MD, MS

    2016-06-01

    Conclusions: Revision burden has gradually decreased for hip replacements and has remained relatively constant for knee replacements both for the last 4 years and compared to historic controls. Knee revision burden was lower than hip revision burden for each period examined. Revision burden is one measure that may be helpful in following the effect of changes in surgical technique and implant design over time in registry populations and may be a helpful way to compare overall results between registries.

  9. The Effects of the Revised CPPNM on Legislative Framework

    International Nuclear Information System (INIS)

    Kwak, Sung-Woo; Yoo, Ho-Sik; Shim, Hye-Won; Chang, Sun-Young; Lee, Jong-Uk

    2006-01-01

    A Diplomatic Conference was held last July at Vienna of Austria and adopted an important Convention in physical protection field. The Convention is the revised Convention on Physical Protection of Nuclear Material. A State Party to the revised CPPNM has obligation to meet the Convention. Since the Amendment to CPPNM is expected to enter into force in near future, there is an urgent need to prepare for implementing the international obligation. Thus, it is important to assess the effect of the revised Convention on national legislative and regulatory framework to govern physical protection of domestic nuclear material and facilities. The objective of this paper is to perform comparative assessment between new provisions of the revised Convention and national law in order to prepare for the implementation of the international norm

  10. Safety of Nuclear Power Plants: Commissioning and Operation. Specific Safety Requirements

    International Nuclear Information System (INIS)

    2017-01-01

    This publication is a revision of IAEA Safety Standards Series No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe commissioning, operation, and transition from operation to decommissioning of nuclear power plants. Over recent years there have been developments in areas such as long term operation of nuclear power plants, plant ageing, periodic safety review, probabilistic safety analysis review and risk informed decision making processes. It became necessary to revise the IAEA’s Safety Requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the IAEA Safety Standards Series No. SF-1, Fundamental Safety Principles. A review of Safety Requirements publications, initiated in 2011 following the accident in the Fukushima Daiichi nuclear power plant in Japan, revealed no significant areas of weakness but resulted in a small set of amendments to strengthen the requirements and facilitate their implementation. These are contained in the present publication.

  11. Transportation system requirements document. Revision 1 DCN01. Supplement

    International Nuclear Information System (INIS)

    1995-05-01

    The original Transportation System Requirements Document described the functions to be performed by and the technical requirements for the Transportation System to transport spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from Purchaser and Producer sites to a Civilian Radioactive Waste Management System (CRWMS) site, and between CRWMS sites. The purpose of that document was to define the system-level requirements. These requirements include design and operations requirements to the extent they impact on the development of the physical segments of Transportation. The document also presented an overall description of Transportation, its functions, its segments, and the requirements allocated to the segments and the system-level interfaces with Transportation. This revision of the document contains only the pages that have been modified

  12. NRC revision to 10 CFR Part 20

    International Nuclear Information System (INIS)

    Baker, R.E.; Cool, W.S.; Mills, W.A.

    1983-01-01

    The Nuclear Regulatory Commission's pollution standards have been revised since publication in the late 1950s, but the basic approach has not changed. The revisions resulted in inaccuracies, conflicts, and ambiguities in requirements. The need for comprehensive updating including radiation-protection principles, risk, occupational exposure dose limits, standards for the public (including de minimis level), surveys and monitoring, disposal into sewerage systems, and records is discussed. 2 tables

  13. Reasons for revision surgery after orbital decompression for Graves’ orbitopathy

    Directory of Open Access Journals (Sweden)

    Stefano Sellari-Franceschini

    2008-06-01

    Full Text Available Stefano Sellari-Franceschini1, Luca Muscatello1, Veronica Seccia1, Riccardo Lenzi1, Amelia Santoro1, Marco Nardi2, Barbara Mazzi3, Aldo Pinchera3, Claudio Marcocci31Department of Neuroscience, 1st ENT division, 2Ophthalmology Division, 3Department of Endocrinology and Metabolism, Orthopaedics and Traumatology, Occupational Medicine, University of Pisa, ItalyObjectives: An analysis of complications and causes of failure in orbital decompression necessitating a second operation.Methods: Between December 1992 and April 2007, 375 patients (719 orbits were operated on using various techniques. Fourteen patients were initially operated on in our unit: 8 (group A1 were re-operated on after a short time due to complications connected with the decompression operation, 7 (group A2 were operated on after some time due to recurrence of the illness or unsatisfactory decompression (one patient is in both group A1 and A2. Five patients (group B underwent a first operation elsewhere.Results: For group A1 the most serious complications were connected to the nasal approach. For group A2 the operations were performed either because of a neuropathy recurrence or for further proptosis reduction due to recurrence or patient dissatisfaction. Lack of preoperative data hinders conclusions about group B, apart from one patient where the operation had not resolved a serious optic neuropathy after decompression based on Olivari technique combined with three-wall operation according to Mourits and colleagues (1990.Conclusions: We can deduce from group A1 that extreme attention is necessary during endonasal access, from group A2 that balancing the eyes is advisable, sacrificing maximum proptosis reduction to gain greater patient satisfaction, and from group B that decompression of the orbital apex is fundamental in the case of neuropathy.Keywords: orbital decompression, Graves’ orbitopathy, revision surgery

  14. How effective is the revised regulatory code for alcohol advertising in Australia?

    Science.gov (United States)

    Jones, Sandra C; Hall, Danika; Munro, Geoffrey

    2008-01-01

    Australia, like several other countries, has a self-regulatory approach to advertising. However, in recent years the effectiveness of the regulatory system has been questioned, and there have been increasing public calls for an overhaul of the system. Following a formal review in 2003, the Ministerial Council on Drug Strategy proposed a revised Alcoholic Beverages Advertising Code (ABAC), which came into operation in 2004. The purpose of the present study was to examine the effectiveness of this revised system. From May 2004 until March 2005 television and magazine advertising campaigns were monitored for alcohol products. Over this period 14 complaints against alcohol advertisements were lodged with the self-regulatory board, and the authors recruited an independent expert panel to assess the advertisements and complaints. In eight of the 14 cases a majority of the judges perceived the advertisement to be in breach of the code, and in no cases did a majority perceive no breach. Conversely, however, none of the complaints were upheld by the Advertising Standards Board (ASB) and only one by the ABAC Panel. The results of this study suggest that the decisions made by the ASB in relation to complaints against alcohol advertisements are not in harmony with the judgement of independent experts, and that the ASB may not be performing an adequate job of representing community standards or protecting the community from offensive or inappropriate advertisements. Further, it appears that the revisions to the ABAC code, and associated processes, have not reduced the problems associated with alcohol advertising in Australia.

  15. Dredging: An Annotated Bibliography on Operations, Equipment, and Processes. Revision.

    Science.gov (United States)

    1982-03-01

    aggregate mining. 0006 APGAR , W. J. and BASCO, D. R. 1973 (Oct). "An Experimental and Theoretical Study of the Flow Field Surrounding a Suction Pipe...modes. Sub-systems designed in way that in case of emergency they can operate independently, or, if necessary, can be over- ruled by manual control...0442 VANONI, V. A. (Editor). 1975. Sedimentation Engineering, Manuals and Reports on Engineering Practice No. 54, ASCE, New York. Contents: Nature of

  16. California; Antelope Valley Air Quality Management District; VOCs from Motor Vehicle Assembly Coating Operations

    Science.gov (United States)

    EPA is proposing to approve a revision to the Antelope Valley Air Quality Management District portion of the California SIP concerning emissions of volatile organic compounds (VOCs) from motor vehicle assembly coating operations.

  17. Single-shell tank closure work plan. Revision A

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    In January 1994, the Hanford Federal Facility Agreement and Conset Order (Tri-Party Agreement) was amended to reflect a revised strategy for remediation of radioactive waste in underground storage tanks. These amendments include milestones for closure of the single-shell tank (SST) operable units, to be initiated by March 2012 and completed by September 2024. This SST-CWP has been prepared to address the principal topical areas identified in Tri-Party Agreement Milestone M-45-06 (i.e., regulatory pathway, operable unit characterization, waste retrieval, technology development, and a strategy for achieving closure). Chapter 2.0 of this SST-CWP provides a brief description of the environmental setting, SST System, the origin and characteristics of SST waste, and ancillary equipment that will be remediated as part of SST operable unit closure. Appendix 2A provides a description of the hydrogeology of the Hanford Site, including information on the unsaturated sediments (vadose zone) beneath the 200 Areas Plateau. Chapter 3.0 provides a discussion of the laws and regulations applicable to closure of the SST farm operable units. Chapter 4.0 provides a summary description of the ongoing characterization activities that best align with the proposed regulatory pathway for closure. Chapter 5.0 describes aspects of the SST waste retrieval program, including retrieval strategy, technology, and sequence, potential tank leakage during retrieval, and considerations of deployment of subsurface barriers. Chapter 6.0 outlines a proposed strategy for closure. Chapter 7.0 provides a summary of the programs underway or planned to develop technologies to support closure. Ca. 325 refs.

  18. Single-shell tank closure work plan. Revision A

    International Nuclear Information System (INIS)

    1995-06-01

    In January 1994, the Hanford Federal Facility Agreement and Conset Order (Tri-Party Agreement) was amended to reflect a revised strategy for remediation of radioactive waste in underground storage tanks. These amendments include milestones for closure of the single-shell tank (SST) operable units, to be initiated by March 2012 and completed by September 2024. This SST-CWP has been prepared to address the principal topical areas identified in Tri-Party Agreement Milestone M-45-06 (i.e., regulatory pathway, operable unit characterization, waste retrieval, technology development, and a strategy for achieving closure). Chapter 2.0 of this SST-CWP provides a brief description of the environmental setting, SST System, the origin and characteristics of SST waste, and ancillary equipment that will be remediated as part of SST operable unit closure. Appendix 2A provides a description of the hydrogeology of the Hanford Site, including information on the unsaturated sediments (vadose zone) beneath the 200 Areas Plateau. Chapter 3.0 provides a discussion of the laws and regulations applicable to closure of the SST farm operable units. Chapter 4.0 provides a summary description of the ongoing characterization activities that best align with the proposed regulatory pathway for closure. Chapter 5.0 describes aspects of the SST waste retrieval program, including retrieval strategy, technology, and sequence, potential tank leakage during retrieval, and considerations of deployment of subsurface barriers. Chapter 6.0 outlines a proposed strategy for closure. Chapter 7.0 provides a summary of the programs underway or planned to develop technologies to support closure. Ca. 325 refs

  19. Effect of graft choice on the outcome of revision anterior cruciate ligament reconstruction in the Multicenter ACL Revision Study (MARS) Cohort

    Science.gov (United States)

    Wright, Rick W.; Huston, Laura J.; Haas, Amanda K.; Spindler, Kurt P.; Nwosu, Sam K.; Allen, Christina R.; Anderson, Allen F.; Cooper, Daniel E.; DeBerardino, Thomas M.; Dunn, Warren R.; Lantz, Brett (Brick) A.; Stuart, Michael J.; Garofoli, Elizabeth A.; Albright, John P.; Amendola, Annunziato (Ned); Andrish, Jack T.; Annunziata, Christopher C.; Arciero, Robert A.; Bach, Bernard R.; Baker, Champ L.; Bartolozzi, Arthur R.; Baumgarten, Keith M.; Bechler, Jeffery R.; Berg, Jeffrey H.; Bernas, Geoffrey A.; Brockmeier, Stephen F.; Brophy, Robert H.; Bush-Joseph, Charles A.; Butler, J. Brad; Campbell, John D.; Carey, James L.; Carpenter, James E.; Cole, Brian J.; Cooper, Jonathan M.; Cox, Charles L.; Creighton, R. Alexander; Dahm, Diane L.; David, Tal S.; Flanigan, David C.; Frederick, Robert W.; Ganley, Theodore J.; Gatt, Charles J.; Gecha, Steven R.; Giffin, James Robert; Hame, Sharon L.; Hannafin, Jo A.; Harner, Christopher D.; Harris, Norman Lindsay; Hechtman, Keith S.; Hershman, Elliott B.; Hoellrich, Rudolf G.; Hosea, Timothy M.; Johnson, David C.; Johnson, Timothy S.; Jones, Morgan H.; Kaeding, Christopher C.; Kamath, Ganesh V.; Klootwyk, Thomas E.; Levy, Bruce A.; Ma, C. Benjamin; Maiers, G. Peter; Marx, Robert G.; Matava, Matthew J.; Mathien, Gregory M.; McAllister, David R.; McCarty, Eric C.; McCormack, Robert G.; Miller, Bruce S.; Nissen, Carl W.; O'Neill, Daniel F.; Owens, Brett D.; Parker, Richard D.; Purnell, Mark L.; Ramappa, Arun J.; Rauh, Michael A.; Rettig, Arthur C.; Sekiya, Jon K.; Shea, Kevin G.; Sherman, Orrin H.; Slauterbeck, James R.; Smith, Matthew V.; Spang, Jeffrey T.; Svoboda, Steven J.; Taft, Timothy N.; Tenuta, Joachim J.; Tingstad, Edwin M.; Vidal, Armando F.; Viskontas, Darius G.; White, Richard A.; Williams, James S.; Wolcott, Michelle L.; Wolf, Brian R.; York, James J.

    2015-01-01

    Background Most surgeons believe that graft choice for ACL reconstruction is an important factor related to outcome. Although graft choice may be limited in the revision setting based on previously used grafts, it is still felt to be important. Hypothesis The purpose of this study was to determine if revision ACL graft choice predicts outcomes related to sports function, activity level, OA symptoms, graft re-rupture, and reoperation at two years following revision reconstruction. We hypothesized that autograft use would result in increased sports function, increased activity level, and decreased OA symptoms (as measured by validated patient reported outcome instruments). Additionally, we hypothesized that autograft use would result in decreased graft failure and reoperation rate 2 years following revision ACL reconstruction. Study Design Prospective cohort study; Level of evidence, 2. Methods Revision ACL reconstruction patients were identified and prospectively enrolled by 83 surgeons over 52 sites. Data collected included baseline demographics, surgical technique and pathology, and a series of validated patient reported outcome instruments (IKDC, KOOS, WOMAC, and Marx activity rating score). Patients were followed up at 2 years, and asked to complete the identical set of outcome instruments. Incidence of additional surgery and reoperation due to graft failure were also recorded. Multivariate regression models were used to determine the predictors (risk factors) of IKDC, KOOS, WOMAC, Marx scores, graft re-rupture, and reoperation rate at 2 years following revision surgery. Results 1205 patients were successfully enrolled with 697 (58%) males. Median age was 26. In 88% this was their first revision. 341 (28%) were undergoing revision by the surgeon that had performed the previous reconstruction. 583 (48%) underwent revision reconstruction utilizing an autograft, 590 (49%) allograft, and 32 (3%) both autograft and allograft. Median time since their last ACL

  20. 9 CFR 108.6 - Revision of plot plans, blueprints, and legends.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Revision of plot plans, blueprints... FACILITY REQUIREMENTS FOR LICENSED ESTABLISHMENTS § 108.6 Revision of plot plans, blueprints, and legends... changes affecting the workflow are to be made. The licensee shall: (a) Prepare revised plot plans...

  1. Poorer survival after a primary implant during revision total knee arthroplasty

    NARCIS (Netherlands)

    Meijer, Marrigje F.; Reininga, Inge H. F.; Boerboom, Alexander L.; Stevens, Martin; Bulstra, Sjoerd K.

    Revision total knee arthroplasty (rTKA) is a complex procedure. Depending on the degree of ligament and bone damage, either primary or revision implants are used. The purpose of this study was to compare survival rates of primary implants with revision implants when used during rTKA. A retrospective

  2. Justification for Continued Operation for Tank 241-Z-361

    Energy Technology Data Exchange (ETDEWEB)

    BOGEN, D.M.

    1999-09-01

    This justification for continued operations (JCO) summarizes analyses performed to better understand and control the potential hazards associated with Tank 241-2-361. This revision to the JCO has been prepared to identify and control the hazards associated with sampling the tank using techniques developed and approved for use in the Tank Waste Remediation System (TWRS) at Hanford.

  3. Justification for Continued Operation for Tank 241-Z-361

    International Nuclear Information System (INIS)

    BOGEN, D.M.

    1999-01-01

    This justification for continued operations (JCO) summarizes analyses performed to better understand and control the potential hazards associated with Tank 241-2-361. This revision to the JCO has been prepared to identify and control the hazards associated with sampling the tank using techniques developed and approved for use in the Tank Waste Remediation System (TWRS) at Hanford

  4. Knowledge and abilities catalog for nuclear power plant operators: Pressurized water reactors. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This document provides the basis for the development of content-valid licensing examinations for reactor operators and senior reactor operators. The examinations developed using the PWR catalog will cover those topics listed under Title 10, (ode of Federal Regulations Part 55. The PWR catalog contains approximately 5100 knowledge and ability (K/A) statements for reactor operators and senior reactor operators. The catalog is organized into six major sections: Catalog Organization; Generic Knowledge and Abilities; Plant Systems; Emergency and Abnormal Plant Evolutions; Components and Theory.

  5. Knowledge and abilities catalog for nuclear power plant operators: Pressurized water reactors. Revision 1

    International Nuclear Information System (INIS)

    1995-08-01

    This document provides the basis for the development of content-valid licensing examinations for reactor operators and senior reactor operators. The examinations developed using the PWR catalog will cover those topics listed under Title 10, (ode of Federal Regulations Part 55. The PWR catalog contains approximately 5100 knowledge and ability (K/A) statements for reactor operators and senior reactor operators. The catalog is organized into six major sections: Catalog Organization; Generic Knowledge and Abilities; Plant Systems; Emergency and Abnormal Plant Evolutions; Components and Theory

  6. Complexities of revision mastoid surgery in a migratory population cohort.

    LENUS (Irish Health Repository)

    Lennon, P

    2012-03-01

    We present a review of patients from Eastern Europe who have recently immigrated to Ireland with complicated otological disease. We carried out a retrospective chart review of these patients. These are a complicated cohort of 7 patients, 5 (71.4%) of whom had previous ear surgery, none had old notes and there was often a need for interpreters (3 or 42.8%) and challenging surgery. Follow up was also problematic with many of the patients. In summary this is a case series to highlight a relatively new group of patients to emphasize the need for pre-operative CT scans, facial nerve monitoring and the difficult nature of revision surgery with no old notes.

  7. Revision of Pachycentria (Melastomataceae)

    NARCIS (Netherlands)

    Clausing, Gudrun

    2000-01-01

    A revision of Pachycentria Blume, which includes the monotypic Pogonanthera Blume, is presented. Pachycentria comprises eight species and one subspecies. Two species, P. vogelkopensis and P. hanseniana, are newly described. The genus is distinguished from other genera in the Medinillinae by a small

  8. Revised accident source terms for light-water reactors

    Energy Technology Data Exchange (ETDEWEB)

    Soffer, L. [Nuclear Regulatory Commission, Washington, DC (United States)

    1995-02-01

    This paper presents revised accident source terms for light-water reactors incorporating the severe accident research insights gained in this area over the last 15 years. Current LWR reactor accident source terms used for licensing date from 1962 and are contained in Regulatory Guides 1.3 and 1.4. These specify that 100% of the core inventory of noble gases and 25% of the iodine fission products are assumed to be instantaneously available for release from the containment. The chemical form of the iodine fission products is also assumed to be predominantly elemental iodine. These assumptions have strongly affected present nuclear air cleaning requirements by emphasizing rapid actuation of spray systems and filtration systems optimized to retain elemental iodine. A proposed revision of reactor accident source terms and some im implications for nuclear air cleaning requirements was presented at the 22nd DOE/NRC Nuclear Air Cleaning Conference. A draft report was issued by the NRC for comment in July 1992. Extensive comments were received, with the most significant comments involving (a) release fractions for both volatile and non-volatile species in the early in-vessel release phase, (b) gap release fractions of the noble gases, iodine and cesium, and (c) the timing and duration for the release phases. The final source term report is expected to be issued in late 1994. Although the revised source terms are intended primarily for future plants, current nuclear power plants may request use of revised accident source term insights as well in licensing. This paper emphasizes additional information obtained since the 22nd Conference, including studies on fission product removal mechanisms, results obtained from improved severe accident code calculations and resolution of major comments, and their impact upon the revised accident source terms. Revised accident source terms for both BWRS and PWRS are presented.

  9. Comparison of mode of failure between primary and revision total knee arthroplasties.

    Science.gov (United States)

    Liang, H; Bae, J K; Park, C H; Kim, K I; Bae, D K; Song, S J

    2018-04-01

    Cognizance of common reasons for failure in primary and revision TKA, together with their time course, facilitates prevention. However, there have been few reports specifically comparing modes of failure for primary vs. revision TKA using a single prosthesis. The goal of the study was to compare the survival rates, modes of failure, and time periods associated with each mode of failure, of primary vs. revision TKA. The survival rates, modes of failure, time period for each mode of failure, and risk factors would differ between primary and revision TKA. Data from a consecutive cohort comprising 1606 knees (1174 patients) of primary TKA patients, and 258 knees (224 patients) of revision TKA patients, in all of whom surgery involved a P.F.C ® prosthesis (Depuy, Johnson & Johnson, Warsaw, IN), was retrospectively reviewed. The mean follow-up periods of primary and revision TKAs were 9.2 and 9.8 years, respectively. The average 10- and 15-year survival rates for primary TKA were 96.7% (CI 95%,±0.7%) and 85.4% (CI 95%,±2.0%), and for revision TKA 91.4% (CI 95%,±2.5%) and 80.5% (CI 95%,±4.5%). Common modes of failure included polyethylene wear, loosening, and infection. The most common mode of failure was polyethylene wear in primary TKA, and infection in revision TKA. The mean periods (i.e., latencies) of polyethylene wear and loosening did not differ between primary and revision TKAs, but the mean period of infection was significantly longer for revision TKA (1.2 vs. 4.8 years, P=0.003). Survival rates decreased with time, particularly more than 10 years post-surgery, for both primary and revision TKAs. Continuous efforts are required to prevent and detect the various modes of failure during long-term follow-up. Greater attention is necessary to detect late infection-induced failure following revision TKA. Case-control study, Level III. Copyright © 2017 Elsevier Masson SAS. All rights reserved.

  10. Revised accident source terms and control room habitability

    International Nuclear Information System (INIS)

    Lahti, G.P.; Hubner, R.S.; Johnson, W.J.; Schwartz, B.C.

    1993-01-01

    In April 1992, the NRC staff presented to the Commissioners the draft NUREG open-quotes Revised Accident Source Terms for Light-Water Nuclear Power Plants.close quotes This document is the culmination of more than ten years of NRC-sponsored research and represents the first change in the NRC's position on source terms since TID-14844 was issued in 1962. The purpose of this paper is to investigate the impact of the revised source terms on the current approach to analyzing control room habitability as required by 10 CFR 50. Sample calculations are presented that identify aspects of the model requiring clarification before the implementation of the revised source terms. 6 refs., 4 tabs

  11. easyCBM CCSS Math Item Scaling and Test Form Revision (2012-2013): Grades 6-8. Technical Report #1313

    Science.gov (United States)

    Anderson, Daniel; Alonzo, Julie; Tindal, Gerald

    2012-01-01

    The purpose of this technical report is to document the piloting and scaling of new easyCBM mathematics test items aligned with the Common Core State Standards (CCSS) and to describe the process used to revise and supplement the 2012 research version easyCBM CCSS math tests in Grades 6-8. For all operational 2012 research version test forms (10…

  12. Revised SWAT. The integrated burnup calculation code system

    International Nuclear Information System (INIS)

    Suyama, Kenya; Mochizuki, Hiroki; Kiyosumi, Takehide

    2000-07-01

    SWAT is an integrated burnup code system developed for analysis of post irradiation examination, transmutation of radioactive waste, and burnup credit problem. This report shows an outline and a user's manual of revised SWAT. This revised SWAT includes expansion of functions, increasing supported machines, and correction of several bugs reported from users of previous SWAT. (author)

  13. Revised SWAT. The integrated burnup calculation code system

    Energy Technology Data Exchange (ETDEWEB)

    Suyama, Kenya; Mochizuki, Hiroki [Department of Fuel Cycle Safety Research, Nuclear Safety Research Center, Tokai Research Establishment, Japan Atomic Energy Research Institute, Tokai, Ibaraki (Japan); Kiyosumi, Takehide [The Japan Research Institute, Ltd., Tokyo (Japan)

    2000-07-01

    SWAT is an integrated burnup code system developed for analysis of post irradiation examination, transmutation of radioactive waste, and burnup credit problem. This report shows an outline and a user's manual of revised SWAT. This revised SWAT includes expansion of functions, increasing supported machines, and correction of several bugs reported from users of previous SWAT. (author)

  14. Text Revision in Deaf and Hearing Bilingual Students

    Science.gov (United States)

    Teruggi, Lilia A.; Gutiérrez-Cáceres, Rafaela

    2016-01-01

    In this study we explored the revision process and strategies implemented by deaf and hearing students who attend the same bilingual school context (LIS and Italian). For that we analysed and compared the types and quality of revisions made by deaf and hearing participants to their first draft of a narrative text ("Frog, Where Are You?")…

  15. Limb Salvage After Failed Initial Operative Management of Bimalleolar Ankle Fractures in Diabetic Neuropathy.

    Science.gov (United States)

    Vaudreuil, Nicholas J; Fourman, Mitchell S; Wukich, Dane K

    2017-03-01

    Ankle fractures in patients with diabetes mellitus (DM) can be difficult to manage, especially in the presence of peripheral neuropathy. In patients who fail initial operative management, attempts at limb salvage can be challenging, and no clear treatment algorithm exists. This study examined outcomes of different procedures performed for limb salvage in this population. This study retrospectively reviewed 17 patients with DM complicated by peripheral neuropathy who sustained a bimalleolar ankle fracture and failed initial operative management. Patients were treated with revision open reduction internal fixation (ORIF) (3/17), closed reduction external fixation (CREF) (8/17), or primary ankle joint fusion (3/17 tibiotalocalcaneal fusion with hindfoot nail [TTCN] and 3/17 with tibiotalar arthrodesis using plates and screws [TTA]). Median follow-up was 20 months. The overall rate of limb salvage was 82.3% (14/17). All patients who went on to amputation presented with infection and were treated initially with CREF (3/3). All patients who achieved successful limb salvage ended up with a clinically fused ankle joint (14/14); 9 underwent a primary or delayed formal fusion and 5 had a clinically fused ankle joint at study conclusion after undergoing revision ORIF or CREF with adjunctive procedures. This small study suggests that in this complicated group of patients it is difficult to achieve limb salvage with an end result of a functional ankle joint. CREF can be a viable option in cases where underlying infection or poor bone quality is present. Treatment with revision ORIF frequently requires supplementary external fixator or tibiotalar Steinman pin placement for additional stability. All patients who underwent revision ORIF ended up with clinically fused ankle joints at the end of the study period. Primary fusion procedures (TTA, TTCN) were associated with a high rate of limb salvage and a decreased number of operations. Level III, retrospective case series.

  16. The impact of subsidence on straight and curved modular cementless revision stems in hip revision surgery.

    Science.gov (United States)

    Fraile Suari, A; Gil González, S; Pérez Prieto, D; León García, A; Mestre Cortadellas, C; Tey Pons, M; Marqués López, F

    Subsidence is one of the potential complications in femoral stem revision total hip arthroplasty surgery, and can affect stability and osseointegration. A retrospective study was conducted on the outcomes at one year and 5 years (specifically subsidence and clinical relevance) of 40 consecutive femoral total hip arthroplasty revisions, comparing two modular cementless revision stems, Straight vs. Curved, with 20 patients in each group. No mechanical failure was observed, and there was an improvement in functional outcomes. Mean radiological subsidence was 9.9±4.9mm (straight=10.75mm vs. curved=9.03mm), with no statistically significant difference between groups (p=0,076). Fourteen patients (35%) had ≥10mm of subsidence, up to a maximum of 22mm. The subsidence found in this study is similar to published series, with no short-term clinical manifestations, or an increased number of complications or stem loosening in either the Straight or Curved group. No differences in subsidence were observed at one year and 5 years after surgery between the 2 types of stems. Copyright © 2017 SECOT. Publicado por Elsevier España, S.L.U. All rights reserved.

  17. Ocean Optics Protocols for Satellite Ocean Color Sensor Validation. Volume 2; Revised

    Science.gov (United States)

    Mueller, James L. (Editor); Fargion, Giulietta S. (Editor); Trees, C.; Austin, R. W.; Pietras, C. (Editor); Hooker, S.; Holben, B.; McClain, Charles R.; Clark, D. K.; Yuen, M.

    2002-01-01

    This document stipulates protocols for measuring bio-optical and radiometric data for the SIMBIOS Project. It supersedes the earlier version, and is organized into four parts: Introductory Background, Instrument Characteristics, Field Measurements and Data Analysis, Data Reporting and Archival. Changes in this revision include the addition of three new chapters: (1) Fundamental Definitions, Relationships and Conventions; (2) MOBY, A Radiometric Buoy for Performance Monitoring and Vicarious Calibration of Satellite Ocean Color Sensors: Measurement and Data Analysis Protocols; and (3) Normalized Water-Leaving Radiance and Remote Sensing Reflectance: Bidirectional Reflectance and Other Factors. Although the present document represents another significant, incremental improvement in the ocean optics protocols, there are several protocols that have either been overtaken by recent technological progress, or have been otherwise identified as inadequate. Revision 4 is scheduled for completion sometime in 2003. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational Project. The contributions are published as submitted, after only minor editing to correct obvious grammatical or clerical errors.

  18. Ocean Optics Protocols for Satellite Ocean Color Sensor Validation. Volume 1; Revised

    Science.gov (United States)

    Mueller, James L. (Editor); Fargion, Giulietta (Editor); Mueller, J. L.; Trees, C.; Austin, R. W.; Pietras, C.; Hooker, S.; Holben, B.; McClain, Charles R.; Clark, D. K.; hide

    2002-01-01

    This document stipulates protocols for measuring bio-optical and radiometric data for the SIMBIOS Project. It supersedes the earlier version, and is organized into four parts: Introductory Background, Instrument Characteristics, Field Measurements and Data Analysis, Data Reporting and Archival. Changes in this revision include the addition of three new chapters: (1) Fundamental Definitions, Relationships and Conventions; (2) MOBY, A Radiometric Buoy for Performance Monitoring and Vicarious Calibration of Satellite Ocean Color Sensors: Measurement and Data Analysis Protocols; and (3) Normalized Water-Leaving Radiance and Remote Sensing Reflectance: Bidirectional Reflectance and Other Factors. Although the present document represents another significant, incremental improvement in the ocean optics protocols, there are several protocols that have either been overtaken by recent technological progress, or have been otherwise identified as inadequate. Revision 4 is scheduled for completion sometime in 2003. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational Project. The contributions are published as submitted, after only minor editing to correct obvious grammatical or clerical errors.

  19. The Operation of the Joint Protocol: Theoretical and Practical Implications Revisited

    International Nuclear Information System (INIS)

    Horbach, N.

    2008-01-01

    Convention and the 1963 Vienna Convention), is even more urgent in respect of its operation under the revised nuclear liability treaties. Any interpretation making the operation of the Joint Protocol ineffective, distorted or even obsolete as to its main object and purpose, would warrant critical analysis as to its benefits it in practice would provide for its Contracting Parties, considering to join any of the revised treaties. This paper aims to provide an analysis of the legal complications involved in respect of the operation of the Joint Protocol, especially in its interrelation with the revised nuclear liability treaties.(author)

  20. EPR first responders revision test

    International Nuclear Information System (INIS)

    2011-01-01

    In this revision test evaluates the acquired knowledge in case of radiological emergency confront. Actions to be taken in relation to people, equipment and the environment. Doses, radioactive sources, pollution

  1. Knowledge and abilities catalog for nuclear power plant operators: boiling water reactors

    International Nuclear Information System (INIS)

    1986-09-01

    The Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Boiling-Water Reactors (BWR) (NUREG-1123) provides the basis for the development of content-valid licensing examinations for reactor operators (ROs) and senior reactor operators (SROs). The examinations developed using the BWR Catalog and Examiners' Handbook for Developing Operator Licensing Examinations (NUREG-1121) will cover those topics listed under Title 10, Code of Federal Regulations, Part 55. The BWR Catalog contains approximately 7000 knowledge and ability (K/A) statements for ROs and SROs at boiling water reactors. Each K/A statement has been rated for its importance to the safe operation of the plant in a manner ensuring personnel and public health and safety. The BWR K/A Catalog is organized into five major sections: Plant-wide Generic Knowledge and Ability Statements, Plant Systems grouped by Safety Function, Emergency and Abnormal Plant Evolutions, Components, and Theory. The BWR Catalog represents a modification of the form and content of the K/A Catalog for Nuclear Power Plant Operators: Pressurized Water Reactors (NUREG-1122). First, categories of knowledge and ability statements have been redefined. Second, the scope of the definition of emergency and abnormal plant evolutions has been revised in line with a symptom-based approach. Third, K/As related to the operational applications of theory have been incorporated into the delineations for both plant systems and emergency and abnormal plant evolutions, while K/As pertaining to theory fundamental to plant operation have been delineated in a separate theory section. Finally, the components section has been revised

  2. Peritoneal Dialysis Access Revision in Children: Causes, Interventions, and Outcomes.

    Science.gov (United States)

    Borzych-Duzalka, Dagmara; Aki, T Fazil; Azocar, Marta; White, Colin; Harvey, Elizabeth; Mir, Sevgi; Adragna, Marta; Serdaroglu, Erkin; Sinha, Rajiv; Samaille, Charlotte; Vanegas, Juan Jose; Kari, Jameela; Barbosa, Lorena; Bagga, Arvind; Galanti, Monica; Yavascan, Onder; Leozappa, Giovanna; Szczepanska, Maria; Vondrak, Karel; Tse, Kei-Chiu; Schaefer, Franz; Warady, Bradley A

    2017-01-06

    Little published information is available about access failure in children undergoing chronic peritoneal dialysis. Our objectives were to evaluate frequency, risk factors, interventions, and outcome of peritoneal dialysis access revision. Data were derived from 824 incident and 1629 prevalent patients from 105 pediatric nephrology centers enrolled in the International Pediatric Peritoneal Dialysis Network Registry between 2007 and 2015. In total, 452 access revisions were recorded in 321 (13%) of 2453 patients over 3134 patient-years of follow-up, resulting in an overall access revision rate of 0.14 per treatment year. Among 824 incident patients, 186 (22.6%) underwent 188 access revisions over 1066 patient-years, yielding an access revision rate of 0.17 per treatment year; 83% of access revisions in incident patients were reported within the first year of peritoneal dialysis treatment. Catheter survival rates in incident patients were 84%, 80%, 77%, and 73% at 12, 24, 36, and 48 months, respectively. By multivariate logistic regression analysis, risk of access revision was associated with younger age (odds ratio, 0.93; 95% confidence interval, 0.92 to 0.95; P<0.001), diagnosis of congenital anomalies of the kidney and urinary tract (odds ratio, 1.28; 95% confidence interval, 1.03 to 1.59; P=0.02), coexisting ostomies (odds ratio, 1.42; 95% confidence interval, 1.07 to 1.87; P=0.01), presence of swan neck tunnel with curled intraperitoneal portion (odds ratio, 1.30; 95% confidence interval, 1.04 to 1.63; P=0.02), and high gross national income (odds ratio, 1.10; 95% confidence interval, 1.02 to 1.19; P=0.01). Main reasons for access revisions included mechanical malfunction (60%), peritonitis (16%), exit site infection (12%), and leakage (6%). Need for access revision increased the risk of peritoneal dialysis technique failure or death (hazard ratio, 1.35; 95% confidence interval, 1.10 to 1.65; P=0.003). Access dysfunction due to mechanical causes doubled the risk

  3. Peritoneal Dialysis Access Revision in Children: Causes, Interventions, and Outcomes

    Science.gov (United States)

    Aki, T. Fazil; Azocar, Marta; White, Colin; Harvey, Elizabeth; Mir, Sevgi; Adragna, Marta; Serdaroglu, Erkin; Sinha, Rajiv; Samaille, Charlotte; Vanegas, Juan Jose; Kari, Jameela; Barbosa, Lorena; Bagga, Arvind; Galanti, Monica; Yavascan, Onder; Leozappa, Giovanna; Szczepanska, Maria; Vondrak, Karel; Tse, Kei-Chiu; Schaefer, Franz; Warady, Bradley A.

    2017-01-01

    Background and objectives Little published information is available about access failure in children undergoing chronic peritoneal dialysis. Our objectives were to evaluate frequency, risk factors, interventions, and outcome of peritoneal dialysis access revision. Design, setting, participants, & measurements Data were derived from 824 incident and 1629 prevalent patients from 105 pediatric nephrology centers enrolled in the International Pediatric Peritoneal Dialysis Network Registry between 2007 and 2015. Results In total, 452 access revisions were recorded in 321 (13%) of 2453 patients over 3134 patient-years of follow-up, resulting in an overall access revision rate of 0.14 per treatment year. Among 824 incident patients, 186 (22.6%) underwent 188 access revisions over 1066 patient-years, yielding an access revision rate of 0.17 per treatment year; 83% of access revisions in incident patients were reported within the first year of peritoneal dialysis treatment. Catheter survival rates in incident patients were 84%, 80%, 77%, and 73% at 12, 24, 36, and 48 months, respectively. By multivariate logistic regression analysis, risk of access revision was associated with younger age (odds ratio, 0.93; 95% confidence interval, 0.92 to 0.95; P<0.001), diagnosis of congenital anomalies of the kidney and urinary tract (odds ratio, 1.28; 95% confidence interval, 1.03 to 1.59; P=0.02), coexisting ostomies (odds ratio, 1.42; 95% confidence interval, 1.07 to 1.87; P=0.01), presence of swan neck tunnel with curled intraperitoneal portion (odds ratio, 1.30; 95% confidence interval, 1.04 to 1.63; P=0.02), and high gross national income (odds ratio, 1.10; 95% confidence interval, 1.02 to 1.19; P=0.01). Main reasons for access revisions included mechanical malfunction (60%), peritonitis (16%), exit site infection (12%), and leakage (6%). Need for access revision increased the risk of peritoneal dialysis technique failure or death (hazard ratio, 1.35; 95% confidence interval, 1

  4. Reduced survival for uncemented compared to cemented total hip arthroplasty after operatively treated acetabular fractures.

    Science.gov (United States)

    Clarke-Jenssen, John; Westberg, Marianne; Røise, Olav; Storeggen, Stein Arne Øvre; Bere, Tone; Silberg, Ingunn; Madsen, Jan Erik

    2017-11-01

    Post traumatic arthritis and avascular necrosis of the femoral head are common complications after operatively treated acetabular fractures. This may cause severe disabilities for the patient, necessitating a total hip arthroplasty. Even though an arthroplasty may provide good symptomatic relief, the long-term results are more uncertain and no consensus exists according to preferred prosthetic designs. With this cohort study, we aimed to investigate the medium to long term arthroplasty survival and clinical results of total hip arthroplasty after operatively treated acetabular fractures. We included 52 patients treated with a secondary total hip arthroplasty at a median of 2.4 (0.1-14.1) years after an operatively treated acetabular fracture. The median age was 54 (11-82) years. Cemented arthroplasty was used for 33 patients, 10 patients had an uncemented arthroplasty and 9 patients received a hybrid arthroplasty. Average follow up was 8.0 (SD 5.0) years. Ten-year revision free arthroplasty survival was 79%. Uncemented arthroplasties had a significantly worse 10-year survival of 57%. Arthroplasties performed at a centre without a pelvic fracture service also had a significantly worse 10-years survival of 51%. Cox regression showed similar results with an 8-fold increase in risk of revision for both uncemented arthroplasties and operations performed at a non-pelvic trauma centre. Total hip arthroplasty secondary to an operatively treated acetabular fracture provides good symptomatic relief. These patients are, however, complex cases and are probably best treated at specialist centres with both pelvic trauma surgeons and arthroplasty surgeons proficient in complex revisions present. Copyright © 2017 Elsevier Ltd. All rights reserved.

  5. Navigation and Alignment Aids Concept of Operations and Supplemental Design Information. Revision A

    Science.gov (United States)

    Kelly, Sean M.; Cryan, Scott P.

    2016-01-01

    The IDSS Navigation and Alignment Aids Concept of Operations and Supplemental Design Information document provides supplemental information to the IDSS IDD. The guide provides insight into the navigation and alignment aids design, and how those aids can be utilized by incoming vehicles for proximity operations and docking. The navigation aids are paramount to successful docking.

  6. Resource description and access 2013 revision

    CERN Document Server

    2013-01-01

    This e-book contains the 2013 Revision of RDA: Resource Description and Access, and includes the July 2013 Update. This e-book offers links within the RDA text and the capability of running rudimentary searches of RDA, but please note that this e-book does not have the full range of content or functionality provided by the subscription product RDA Toolkit. Included: A full accumulation of RDA- the revision contains a full set of all current RDA instructions. It replaces the previous version of RDA Print as opposed to being an update packet to that version. RDA has gone through many changes sin

  7. Regulations for the safe transport of radioactive material. 1996 edition (revised)

    International Nuclear Information System (INIS)

    2000-01-01

    Following a comprehensive review by panels of experts convened by the IAEA starting in 1991, a revised version of the IAEA Regulations for the Safe Transport of Radioactive Material (formerly Safety Series No. 6) was approved by the Board of Governors in September 1996. This publication supersedes all editions of the Regulations issued under Safety Series No. 6. By 1969, the Regulations had been adopted by almost all international organizations concerned with transport and used by many Member States for their own regulations. Through the worldwide adoption of the IAEA Regulations for all modes of transport, a very high standard of safety in transport has been achieved. In the revisions since the first edition, attempts have been made to find a balance between the need to take account of technical advances and operational experience, and the desirability of providing a stable framework of regulatory requirements. One of the aims of this approach is to allow packages designed to previous versions of the Regulations to continue to be used for a reasonable period of time. It is recognized that not all regulatory changes can be implemented simultaneously; Member States and international organizations are therefore invited, in adopting this revision, to provide for use of both the 'old' requirements and the 'new' ones during a period of transition that may last for a few years. It is further recommended that adoption of these revised Regulations occur within a period of five years from publication to achieve worldwide harmonization of their application. In implementing the provisions of these Regulations, it may be necessary for Member States to issue complementary national regulations. Except as necessary for solely domestic purposes, such national regulations should not conflict with these Regulations. For convenience, the requirements to be met for the transport of specified types of consignments are included in an abbreviated form as Schedules in this publication

  8. Regulations for the safe transport of radioactive material. 1996 edition (revised)

    International Nuclear Information System (INIS)

    2002-01-01

    Following a comprehensive review by panels of experts convened by the IAEA starting in 1991, a revised version of the IAEA Regulations for the Safe Transport of Radioactive Material (formerly Safety Series No. 6) was approved by the Board of Governors in September 1996. This publication supersedes all editions of the Regulations issued under Safety Series No. 6. By 1969, the Regulations had been adopted by almost all international organizations concerned with transport and used by many Member States for their own regulations. Through the worldwide adoption of the IAEA Regulations for all modes of transport, a very high standard of safety in transport has been achieved. In the revisions since the first edition, attempts have been made to find a balance between the need to take account of technical advances and operational experience, and the desirability of providing a stable framework of regulatory requirements. One of the aims of this approach is to allow packages designed to previous versions of the Regulations to continue to be used for a reasonable period of time. It is recognized that not all regulatory changes can be implemented simultaneously. Member States and international organizations are therefore invited, in adopting this revision, to provide for use of both the 'old' requirements and the 'new' ones during a period of transition that may last for a few years. It is further recommended that adoption of these revised Regulations occur within a period of five years from publication to achieve worldwide harmonization of their application. In implementing the provisions of these Regulations, it may be necessary for Member States to issue complementary national regulations. Except as necessary for solely domestic purposes, such national regulations should not conflict with these Regulations. For convenience, the requirements to be met for the transport of specified types of consignments are included in an abbreviated form as Schedules in this publication

  9. Maintenance implementation plan for the Plutonium Finishing Plant. Revision 3

    International Nuclear Information System (INIS)

    Meldrom, C.A.

    1996-03-01

    This document outlines the Maintenance Implementation Plan (MIP) for the Plutonium Finishing Plant (PFP) located at the Hanford site at Richland, Washington. This MIP describes the PFP maintenance program relative to DOE order 4330.4B. The MIP defines the key actions needed to meet the guidelines of the Order to produce a cost-effective and efficient maintenance program. A previous report identified the presence of significant quantities of Pu-bearing materials within PFP that pose risks to workers. PFP's current mission is to develop, install and operate processes which will mitigate these risks. The PFP Maintenance strategy is to equip the facility with systems and equipment able to sustain scheduled PFP operations. The current operating run is scheduled to last seven years. Activities following the stabilization operation will involve an Environmental Impact Statement (EIS) to determine future plant activities. This strategy includes long-term maintenance of the facility for safe occupancy and material storage. The PFP maintenance staff used the graded approach to dictate the priorities of the improvement and upgrade actions identified in Chapter 2 of this document. The MIP documents PFP compliance to the DOE 4330.4B Order. Chapter 2 of the MIP follows the format of the Order in addressing the eighteen elements. As this revision is a total rewrite, no sidebars are included to highlight changes

  10. Perioperative transfusion threshold and ambulation after hip revision surgery

    DEFF Research Database (Denmark)

    Nielsen, Kamilla; Johansson, Pär I; Dahl, Benny

    2014-01-01

    BACKGROUND: Transfusion with red blood cells (RBC) may be needed during hip revision surgery but the appropriate haemoglobin concentration (Hb) threshold for transfusion has not been well established. We hypothesized that a higher transfusion threshold would improve ambulation after hip revision...... surgery. METHODS: The trial was registered at Clinicaltrials.gov ( NCT00906295). Sixty-six patients aged 18 years or older undergoing hip revision surgery were randomized to receive RBC at a Hb threshold of either 7.3 g/dL (restrictive group) or 8.9 g/dL (liberal group). Postoperative ambulation...... received RBC. CONCLUSIONS: A Hb transfusion threshold of 8.9 g/dL was associated with a statistically significantly faster TUG after hip revision surgery compared to a threshold of 7.3 g/dL but the clinical importance is questionable and the groups did not differ in Hb at the time of testing....

  11. Structured Head and Neck CT Angiography Reporting Reduces Resident Revision Rates.

    Science.gov (United States)

    Johnson, Tucker F; Brinjikji, Waleed; Doolittle, Derrick A; Nagelschneider, Alex A; Welch, Brian T; Kotsenas, Amy L

    2018-04-12

    This resident-driven quality improvement project was undertaken to assess the effectiveness of structured reporting to reduce revision rates for afterhours reports dictated by residents. The first part of the study assessed baseline revision rates for head and neck CT angiography (CTA) examinations dictated by residents during afterhours call. A structured report was subsequently created based on templates on the RSNA informatics reporting website and critical findings that should be assessed for on all CTA examinations. The template was made available to residents through the speech recognition software for all head and neck CTA examinations for a duration of 2 months. Report revision rates were then compared with and without use of the structured template. The structured template was found to reduce revision rates by approximately 50% with 10/41 unstructured reports revised and 2/17 structured reports revised. We believe that structured reporting can help reduce reporting errors, particularly in term of typographical errors, train residents to evaluate complex examinations in a systematic fashion, and assist them in recalling critical findings on these examinations. Copyright © 2018 Elsevier Inc. All rights reserved.

  12. Revised data taking schedule with ion beams

    CERN Document Server

    Gazdzicki, Marek; Aduszkiewicz, A; Andrieu, B; Anticic, T; Antoniou, N; Argyriades, J; Asryan, A G; Baatar, B; Blondel, A; Blumer, J; Boldizsar, L; Bravar, A; Brzychczyk, J; Bubak, A; Bunyatov, S A; Choi, K U; Christakoglou, P; Chung, P; Cleymans, J; Derkach, D A; Diakonos, F; Dominik, W; Dumarchez, J; Engel, R; Ereditato, A; Feofilov, G A; Fodor, Z; Ferrero, A; Gazdzicki, M; Golubeva, M; Grebieszkow, K; Grzeszczuk, A; Guber, F; Hasegawa, T; Haungs, A; Igolkin, S; Ivanov, A S; Ivashkin, A; Kadija, K; Katrynska, N; Kielczewska, D; Kikola, D; Kisiel, J; Kobayashi, T; Kolesnikov, V I; Kolev, D; Kolevatov, R S; Kondratiev, V P; Kowalski, S; Kurepin, A; Lacey, R; Laszlo, A; Lyubushkin, V V; Majka, Z; I Malakhov, A; Marchionni, A; Marcinek, A; Maris, I; Matveev, V; Melkumov, G L; Meregaglia, A; Messina, M; Mijakowski, P; Mitrovski, M; Montaruli, T; Mrówczynski, St; Murphy, S; Nakadaira, T; Naumenko, P A; Nikolic, V; Nishikawa, K; Palczewski, T; Pálla, G; Panagiotou, A D; Peryt, W; Planeta, R; Pluta, J; Popov, B A; Posiadala, M; Przewlocki, P; Rauch, W; Ravonel, M; Renfordt, R; Röhrich, D; Rondio, E; Rossi, B; Roth, M; Rubbia, A; Rybczynski, M; Sadovskii, A; Sakashita, K; Schuster, T; Sekiguchi, T; Seyboth, P; Shibata, M; Sissakian, A N; Skrzypczak, E; Slodkowski, M; Sorin, A S; Staszel, P; Stefanek, G; Stepaniak, J; Strabel, C; Ströbele, H; Susa, T; Szentpétery, I; Szuba, M; Tada, M; Taranenko, A; Tsenov, R; Ulrich, R; Unger, M; Vassiliou, M; Vechernin, V V; Vesztergombi, G; Wlodarczyk, Z; Wojtaszek, A; Zipper, W; CERN. Geneva. SPS and PS Experiments Committee; SPSC

    2009-01-01

    This document presents the revised data taking schedule of NA61 with ion beams. The revision takes into account limitations due to the new LHC schedule as well as final results concerning the physics performance with secondary ion beams. It is proposed to take data with primary Ar and Xe beams in 2012 and 2014, respectively, and to test and use for physics a secondary B beam from primary Pb beam fragmentation in 2010, 2011 and 2013.

  13. Engineering drawing field verification program. Revision 3

    International Nuclear Information System (INIS)

    Ulk, P.F.

    1994-01-01

    Safe, efficient operation of waste tank farm facilities is dependent in part upon the availability of accurate, up-to-date plant drawings. Accurate plant drawings are also required in support of facility upgrades and future engineering remediation projects. This supporting document establishes the procedure for performing a visual field verification of engineering drawings, the degree of visual observation being performed and documenting the results. A copy of the drawing attesting to the degree of visual observation will be paginated into the released Engineering Change Notice (ECN) documenting the field verification for future retrieval and reference. All waste tank farm essential and support drawings within the scope of this program will be converted from manual to computer aided drafting (CAD) drawings. A permanent reference to the field verification status will be placed along the right border of the CAD-converted drawing, referencing the revision level, at which the visual verification was performed and documented

  14. New Mandates and Imperatives in the Revised "ACA Code of Ethics"

    Science.gov (United States)

    Kaplan, David M.; Kocet, Michael M.; Cottone, R. Rocco; Glosoff, Harriet L.; Miranti, Judith G.; Moll, E. Christine; Bloom, John W.; Bringaze, Tammy B.; Herlihy, Barbara; Lee, Courtland C.; Tarvydas, Vilia M.

    2009-01-01

    The first major revision of the "ACA Code of Ethics" in a decade occurred in late 2005, with the updated edition containing important new mandates and imperatives. This article provides interviews with members of the Ethics Revision Task Force that flesh out seminal changes in the revised "ACA Code of Ethics" in the areas of confidentiality,…

  15. Cost Implications of Primary Versus Revision Surgery in Adult Spinal Deformity.

    Science.gov (United States)

    Qureshi, Rabia; Puvanesarajah, Varun; Jain, Amit; Kebaish, Khaled; Shimer, Adam; Shen, Francis; Hassanzadeh, Hamid

    2017-08-01

    Adult spinal deformity (ASD) is an important problem to consider in the elderly. Although studies have examined the complications of ASD surgery and have compared functional and radiographic results of primary surgery versus revision, no studies have compared the costs of primary procedures with revisions. We assessed the in-hospital costs of these 2 surgery types in patients with ASD. The PearlDiver Database, a database of Medicare records, was used in this study. Mutually exclusive groups of patients undergoing primary or revision surgery were identified. Patients in each group were queried for age, sex, and comorbidities. Thirty-day readmission rates, 30-day and 90-day complication rates, and postoperative costs of care were assessed with multivariate analysis. For analyses, significance was set at P average reimbursement of the primary surgery cohort was $57,078 ± $30,767. Reimbursement of revision surgery cohort was $52,999 ± $27,658. The adjusted difference in average costs between the 2 groups is $4773 ± $1069 (P day and 90-day adjusted difference in cost of care when sustaining any of the major medical complications in primary surgery versus revision surgery was insignificant. Patients undergoing primary and revision corrective procedures for ASD have similar readmission rates, lengths of stays, and complication rates. Our data showed a higher cost of primary surgery compared with revision surgery, although costs of sustaining postoperative complications were similar. This finding supports the decision to perform revision procedures in patients with ASD when indicated because neither outcomes nor costs are a hindrance to correction. Copyright © 2017 Elsevier Inc. All rights reserved.

  16. CLASSIFICATION OF THE MGR SITE OPERATIONS SYSTEM

    International Nuclear Information System (INIS)

    J.A. Ziegler

    1999-01-01

    The purpose of this analysis is to document the Quality Assurance (QA) classification of the Monitored Geologic Repository (MGR) site operations system structures, systems and components (SSCs) performed by the MGR Safety Assurance Department. This analysis also provides the basis for revision of YMP/90-55Q, Q-List (YMP 1998). The Q-List identifies those MGR SSCs subject to the requirements of DOE/RW-0333P, ''Quality Assurance Requirements and Description'' (QARD) (DOE 1998)

  17. 76 FR 1440 - Notice of Revised Child Outcomes Framework

    Science.gov (United States)

    2011-01-10

    ... Outcomes Framework, renamed The Head Start Child Development and Learning Framework: Promoting Positive Outcomes in Early Childhood Programs Serving Children 3-5 Years Old. The Framework was revised to give more... DEPARTMENT OF HEALTH AND HUMAN SERVICES Administration for Children and Families Notice of Revised...

  18. Spent nuclear fuel project cold vacuum drying facility operations manual

    International Nuclear Information System (INIS)

    IRWIN, J.J.

    1999-01-01

    This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-SD-SNF-SAR-002, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of Processing Systems (Garvin 1998) and, the HNF-SD-SNF-DRD-002, 1997, Cold Vacuum Drying Facility Design Requirements, Rev. 3a. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence, and has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved

  19. Clinical observation of needle revision and 5-fluorouracil subconjunctive injection for the dysfunctional filtering blebs

    Directory of Open Access Journals (Sweden)

    Yan-Hua Gao

    2016-07-01

    Full Text Available AIM:To investigate the efficacy and safety of needle revision with 5-fluorouracil(5-FUon the dysfunctional filtering blebs after trabeculectomy and to assess the factors that may impact the success. METHODS:Eighty-three eyes in 76 patients underwent the needle revision and 5-FU subconjunctive injection for the dysfunctional blebs after trabeculectomy and were followed up for 12mo. The intraocular pressure(IOP, the number of drugs, corneal endothclium, bleb morphology and complications were observed and recorded. RESULTS:IOP decreased significantly from 35.3±5.8mmHg(1kPa=7.5mmHgof pre-needling to 17.0±4.3mmHg of post-needling(PPCI: 10.3-11.6. Statistically, there were no significant difference on needling effect with reference to the types of glaucoma, the use of mitomycin C(MMCduring the previous filtration surgery, the ages of patients, the intervals of needling operation from previous trabeculectomy, while there were significant difference on needling effect with reference to bleb appearance before needling, and the mean number of needling in patients that had surgery within 3mo were less than those who had surgery for more than 3mo. CONCLUSION: The needle revision combined with 5-FU is a safe, effective and simple method. Dysfunctional blebs should be treated early after trabeculectomy.

  20. INDIRECT WRITTEN CORRECTIVE FEEDBACK, REVISION, AND LEARNING

    Directory of Open Access Journals (Sweden)

    Fatemeh Poorebrahim

    2017-01-01

    Full Text Available Corrective feedback, the necessity of providing it, and how it should be provided has been one of the hot topics in the area of ELT. Amid continuing controversies over whether providing feedback helps L2 learners improve their writing accuracy, many research studies have been undertaken to compare the relative effectiveness of different types of feedback. However, the difference between two types of indirect corrective feedback, namely indication and indication plus location, have not been properly examined yet. Motivated to narrow this gap, this study is designed to compare two groups of Iranian learners, each revising their papers based on one of the aforementioned options. For data analysis, a series of independent samples t tests were employed. The results revealed that the difference between the two groups in their reduction of errors from the original draft to the revision of each task followed a growing trend and became significant. Nonetheless, the difference in accuracy of new pieces of writing fell short of significance. Finally, it was found that error reduction in revision stage cannot be considered as learning. The results of the study, discussed in relation to that of others, implicate that the purpose for which feedback is provided is essential in determining the type of feedback; more explicit feedback is better for revising purposes while more implicit feedback is good for learning purposes.

  1. Multiple-hook fixation in revision spinal deformity surgery for patients with a previous multilevel fusion mass: technical note and preliminary outcomes.

    Science.gov (United States)

    Liu, Ning; Wood, Kirkham B

    2017-03-01

    OBJECTIVE A previous multilevel fusion mass encountered during revision spinal deformity surgery may obscure anatomical landmarks, making instrumentation unworkable or incurring substantial blood loss and operative time. This study introduced a surgical technique of multiple-hook fixation for fixating previous multilevel fusion masses in revision spinal deformity surgeries and then evaluated its outcomes. METHODS Patients with a previous multilevel fusion mass who underwent revision corrective surgery down to the lumbosacral junction were retrospectively studied. Multiple hooks were used to fixate the fusion mass and linked to distal pedicle screws in the lumbosacral-pelvic complex. Radiological and clinical outcomes were evaluated. RESULTS The charts of 8 consecutive patients with spinal deformity were retrospectively reviewed (7 women, 1 man; mean age 56 years). The primary diagnoses included flat-back deformity (6 cases), thoracolumbar kyphoscoliosis (1 case), and lumbar spondylosis secondary to a previous scoliosis fusion (1 case). The mean follow-up duration was 30.1 months. Operations were performed at T3/4-ilium (4 cases), T7-ilium (1 case), T6-S1 (1 case), T12-S1 (1 case), and T9-L5 (1 case). Of 8 patients, 7 had sagittal imbalance preoperatively, and their mean C-7 plumb line improved from 10.8 ± 2.9 cm preoperatively to 5.3 ± 3.6 cm at final follow-up (p = 0.003). The mean lumbar lordosis of these patients at final follow-up was significantly greater than that preoperatively (35.2° ± 12.6° vs 16.8° ± 11.8°, respectively; p = 0.005). Two perioperative complications included osteotomy-related leg weakness in 1 patient and a stitch abscess in another. CONCLUSIONS The multiple-hook technique provides a viable alternative option for fixating a previous multilevel fusion mass in revision spinal deformity surgery.

  2. Artificial intelligence applications for operation and maintenance

    International Nuclear Information System (INIS)

    Itoh, M.; Tai, I.; Monta, K.; Sekimizu, K.

    1987-01-01

    A nuclear power plant as a typical man-machine system of the modern industry needs an efficient human window through which operators can observe every necessary detail of the plant for its safe and reliable operation. Much efforts have been devoted to the development of the computerized operator support systems (COSS). Recent development of artificial intelligence (AI) seems to offer new possibility to strengthen the performance of the COSS such as more powerful diagnosis and procedure synthesis and user friendly man-machine interfaces. From this point of view, a national project of Advanced Man-Machine System Development for Nuclear Power Plants has been carried out. Artificial intelligence application to nuclear power plant operation and maintenance is also selected as a major theme for the promotion of research and development on frontiers in the recently revised long term national program for development and utilization of nuclear energy in JAPAN

  3. Operating manual for the Health Physics Research Reactor

    International Nuclear Information System (INIS)

    1985-11-01

    This manual is intended to serve as a guide in the operation and maintenance of the Health Physics Researh Reactor (HPRR) of the Health Physics Dosimetry Applications Research (DOSAR) Facility. It includes descriptions of the HPRR and of associated equipment such as the reactor positioning devises and the derrick. Procedures for routine operation of the HPRR are given in detail, and checklists for the various steps are provided where applicable. Emergency procedures are similarly covered, and maintenance schedules are outlined. Also, a bibliography of references giving more detailed information on the DOSAR Facility is included. Changes to this manual will be approved by at least two of the following senior staff members: (1) the Operations Division Director, (2) the Reactor Operations Department Head, (3) the Supervisor of Reactor Operations TSF-HPRR Areas. The master copy and the copy of the manual issued to the HPRR Operations Supervisor will always reflect the latest revision. 22 figs

  4. Corporate Author Entries. Revision 5

    International Nuclear Information System (INIS)

    Hendricks, P.L.

    1986-05-01

    This reference authority has been created and is maintained to provide standard forms for recording the names of organizations consistently in bibliographic citations. This revision includes approximately 42,000 entries established since 1973

  5. Psychometric properties of Conversion Disorder Scale- Revised (CDS) for children.

    Science.gov (United States)

    Ijaz, Tazvin; Nasir, Attikah; Sarfraz, Naema; Ijaz, Shirmeen

    2017-05-01

    To revise conversion disorder scale and to establish the psychometric properties of the revised scale. This case-control study was conducted from February to June, 2014, at the Government College University, Lahore, Pakistan, and comprised schoolchildren and children with conversion disorder. In order to generate items for revised version of conversion disorder scale, seven practising mental health professionals were consulted. A list of 42 items was finalised for expert ratings. After empirical validation, a scale of 40 items was administered on the participants and factor analysis was conducted. Of the240 participants, 120(50%) were schoolchildren (controls group) and 120(50%)were children with conversion disorder (clinical group).The results of factor analysis revealed five factors (swallowing and speech symptoms, motor symptoms, sensory symptoms, weakness and fatigue, and mixed symptoms) and retention of all 40 items of revised version of conversion disorder scale. Concurrent validity of the revised scale was found to be 0.81 which was significantly high. Similarly, discriminant validity of the scale was also high as both clinical and control groups had significant difference (pconversion disorder scale was 76% sensitive to predicting conversion disorder while specificity showed that the scale was 73% accurate in specifying participants of the control group. The revised version of conversion disorder scale was a reliable and valid tool to be used for screening of children with conversion disorder.

  6. Revisions of K/Ar ages for the Hadar hominid site, Ethiopia

    Energy Technology Data Exchange (ETDEWEB)

    Walter, R.C.; Aronson, J.L. (Case Western Reserve Univ., Cleveland, OH (USA). Dept. of Geology)

    1982-03-11

    Conventional K/Ar age measurements are reported for two volcanic units from the hominid-bearing Hadar Formation. These ages represent revision of previously published ages for the BKT-2 tephra and the Kadada Moumou basalt. BKT-2 is revised from 2.65 to 2.9 Myr BP and the Kadada Moumou basalt is revised from 3.0 to 3.6 Myr BP.

  7. Revised Tijeras Arroyo Groundwater Current Conceptual Model and Corrective Measures Evaluation Report - February 2018.

    Energy Technology Data Exchange (ETDEWEB)

    Copland, John R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2018-02-01

    The U.S. Department of Energy (DOE) and the management and operating (M&O) contractor for Sandia National Laboratories beginning on May 1, 2017, National Technology & Engineering Solutions of Sandia, LLC (NTESS), hereinafter collectively referred to as DOE/NTESS, prepared this Revised Tijeras Arroyo Groundwater Current Conceptual Model (CCM) and Corrective Measures Evaluation (CME) Report , referred to as the Revised CCM/CME Report, to meet requirements under the Sandia National Laboratories-New Mexico (SNL/NM) Compliance Order on Consent (Consent Order). The Consent Order became effective on April 29, 2004. The Consent Order identifies the Tijeras Arroyo Groundwater (TAG) Area of Concern (AOC) as an area of groundwater contamination requiring further characterization and corrective action. In November 2004, New Mexico Environment Department (NMED) approved the July 2004 CME Work Plan. In April 2005, DOE and the SNL M&O contractor at the time, Sandia Corporation (Sandia), hereinafter collectively referred to as DOE/Sandia, submitted a CME Report, but NMED did not finalize review of that document. In December 2016, DOE/Sandia submitted a combined and updated CCM/CME Report. NMED issued a disapproval letter in May 2017 that included comments on the December 2016 CCM/CME Report. In August 2017, NMED and DOE/NTESS staff held a meeting to discuss and clarify outstanding issues. This Revised CCM/CME Report addresses (1) the issues presented in the NMED May 2017 disapproval letter and (2) findings from the August 2017 meeting.

  8. The revision of the master's curiculm at Osaka Kyoiku University

    OpenAIRE

    赤松, 喜久; 伊藤, 敏雄

    2007-01-01

    The background covering the revision of the master's curriculum and a point concerning this revision in a teacher-training program at Osaka Kyoiku University are explained in this paper. Furthermore, future problems are organized and evaluated. The paper will help us to consider the revision of the curriculum expected as part of the master's course in a teacher's program. The number of required subjects is minimal so that a student may take more optional subjects to meet various needs. New su...

  9. Revision of IRIS/IDA Seismic Station Metadata

    Science.gov (United States)

    Xu, W.; Davis, P.; Auerbach, D.; Klimczak, E.

    2017-12-01

    Trustworthy data quality assurance has always been one of the goals of seismic network operators and data management centers. This task is considerably complex and evolving due to the huge quantities as well as the rapidly changing characteristics and complexities of seismic data. Published metadata usually reflect instrument response characteristics and their accuracies, which includes zero frequency sensitivity for both seismometer and data logger as well as other, frequency-dependent elements. In this work, we are mainly focused studying the variation of the seismometer sensitivity with time of IRIS/IDA seismic recording systems with a goal to improve the metadata accuracy for the history of the network. There are several ways to measure the accuracy of seismometer sensitivity for the seismic stations in service. An effective practice recently developed is to collocate a reference seismometer in proximity to verify the in-situ sensors' calibration. For those stations with a secondary broadband seismometer, IRIS' MUSTANG metric computation system introduced a transfer function metric to reflect two sensors' gain ratios in the microseism frequency band. In addition, a simulation approach based on M2 tidal measurements has been proposed and proven to be effective. In this work, we compare and analyze the results from three different methods, and concluded that the collocated-sensor method is most stable and reliable with the minimum uncertainties all the time. However, for epochs without both the collocated sensor and secondary seismometer, we rely on the analysis results from tide method. For the data since 1992 on IDA stations, we computed over 600 revised seismometer sensitivities for all the IRIS/IDA network calibration epochs. Hopefully further revision procedures will help to guarantee that the data is accurately reflected by the metadata of these stations.

  10. 75 FR 17253 - Revisions to the General Conformity Regulations

    Science.gov (United States)

    2010-04-05

    ... Part III Environmental Protection Agency 40 CFR Parts 51 and 93 Revisions to the General... under the minor source New Source Review (NSR) programs similar to the EPA's existing General Conformity... EPA is making two minor revisions to the definition. First, EPA is correcting the citation for the SIP...

  11. ASSET guidelines. Revised 1991 Edition

    International Nuclear Information System (INIS)

    1991-12-01

    The present publication is an updated version of the IAEA Assessment of Safety Significant Events Team (ASSET) Guidelines, IAEA-TECDOC-573, published in 1990. Sections 5 and 6 include revised definitions and investigation guidelines for identification of both direct and root causes. These revisions were recommended by a Consultants Meeting held in Vienna on 3-7 December 1990. This guidance is not intended to infringe an expert's prerogative to investigate additional items. Its main purpose is to provide a basic structure and ensure consistency in the assessments. Use of the ASSET guidelines should also facilitate comparison between the observations made in different nuclear power plants and harmonize the reporting of generic ASSET results. The guidelines should always be used with a critical attitude and a view to possible improvements

  12. What Is the Rerevision Rate After Revising a Hip Resurfacing Arthroplasty? Analysis From the AOANJRR.

    Science.gov (United States)

    Wong, James Min-Leong; Liu, Yen-Liang; Graves, Stephen; de Steiger, Richard

    2015-11-01

    More than 15,000 primary hip resurfacing arthroplasties have been recorded by the Australian Orthopaedic Association National Joint Replacement Registry (AOANJRR) with 884 primary procedures requiring revision for reasons other than infection, a cumulative percent revision rate at 12 years of 11%. However, few studies have reported the survivorship of these revision procedures. (1) What is the cumulative percent rerevision rate for revision procedures for failed hip resurfacings? (2) Is there a difference in rerevision rate among different types of revision or bearing surfaces? The AOANJRR collects data on all primary and revision hip joint arthroplasties performed in Australia and after verification against health department data, checking of unmatched procedures, and subsequent retrieval of unreported procedures is able to obtain an almost complete data set relating to hip arthroplasty in Australia. Revision procedures are linked to the known primary hip arthroplasty. There were 15,360 primary resurfacing hip arthroplasties recorded of which 884 had undergone revision and this was the cohort available to study. The types of revisions were acetabular only, femoral only, or revision of both acetabular and femoral components. With the exception of the acetabular-only revisions, all revisions converted hip resurfacing arthroplasties to conventional (stemmed) total hip arthroplasties (THAs). All initial revisions for infection were excluded. The survivorship of the different types of revisions and that of the different bearing surfaces used were estimated using the Kaplan-Meier method and compared using Cox proportional hazard models. Cumulative percent revision was calculated by determining the complement of the Kaplan-Meier survivorship function at that time multiplied by 100. Of the 884 revisions recorded, 102 underwent further revision, a cumulative percent rerevision at 10 years of 26% (95% confidence interval, 19.6-33.5). There was no difference in the rate of

  13. NV/YMP radiological control manual, Revision 2

    International Nuclear Information System (INIS)

    Gile, A.L.

    1996-11-01

    The Nevada Test Site (NTS) and the adjacent Yucca Mountain Project (YMP) are located in Nye County, Nevada. The NTS has been the primary location for testing nuclear explosives in the continental US since 1951. Current activities include operating low-level radioactive and mixed waste disposal facilities for US defense-generated waste, assembly/disassembly of special experiments, surface cleanup and site characterization of contaminated land areas, and non-nuclear test operations such as controlled spills of hazardous materials at the hazardous Materials (HAZMAT) Spill Center (HSC). Currently, the major potential for occupational radiation exposure is associated with the burial of low-level nuclear waste and the handling of radioactive sources. Planned future remediation of contaminated land areas may also result in radiological exposures. The NV/YMP Radiological Control Manual, Revision 2, represents DOE-accepted guidelines and best practices for implementing Nevada Test Site and Yucca Mountain Project Radiation Protection Programs in accordance with the requirements of Title 10 Code of Federal Regulations Part 835, Occupational Radiation Protection. These programs provide protection for approximately 3,000 employees and visitors annually and include coverage for the on-site activities for both personnel and the environment. The personnel protection effort includes a DOE Laboratory Accreditation Program accredited dosimetry and personnel bioassay programs including in-vivo counting, routine workplace air sampling, personnel monitoring, and programmatic and job-specific As Low as Reasonably Achievable considerations

  14. NV/YMP radiological control manual, Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Gile, A.L. [comp.

    1996-11-01

    The Nevada Test Site (NTS) and the adjacent Yucca Mountain Project (YMP) are located in Nye County, Nevada. The NTS has been the primary location for testing nuclear explosives in the continental US since 1951. Current activities include operating low-level radioactive and mixed waste disposal facilities for US defense-generated waste, assembly/disassembly of special experiments, surface cleanup and site characterization of contaminated land areas, and non-nuclear test operations such as controlled spills of hazardous materials at the hazardous Materials (HAZMAT) Spill Center (HSC). Currently, the major potential for occupational radiation exposure is associated with the burial of low-level nuclear waste and the handling of radioactive sources. Planned future remediation of contaminated land areas may also result in radiological exposures. The NV/YMP Radiological Control Manual, Revision 2, represents DOE-accepted guidelines and best practices for implementing Nevada Test Site and Yucca Mountain Project Radiation Protection Programs in accordance with the requirements of Title 10 Code of Federal Regulations Part 835, Occupational Radiation Protection. These programs provide protection for approximately 3,000 employees and visitors annually and include coverage for the on-site activities for both personnel and the environment. The personnel protection effort includes a DOE Laboratory Accreditation Program accredited dosimetry and personnel bioassay programs including in-vivo counting, routine workplace air sampling, personnel monitoring, and programmatic and job-specific As Low as Reasonably Achievable considerations.

  15. Influence of the revision of surgical fee schedule on surgeons' productivity in Japan: A cohort analysis of 7602 surgical procedures in 2013-2016.

    Science.gov (United States)

    Nakata, Yoshinori; Watanabe, Yuichi; Narimatsu, Hiroto; Yoshimura, Tatsuya; Otake, Hiroshi; Sawa, Tomohiro

    2018-02-01

    The goal of this study is to evaluate the pure impact of the revision of surgical fee schedule on surgeons' productivity. We collected data from the surgical procedures performed by the surgeons working in Teikyo University Hospital from 1 April through 30 September in 2013-2016. We employed non-radial and non-oriented Malmquist model. We defined the decision-making unit as a surgeon with the highest academic rank in surgery. Inputs were defined as (1) the number of doctors who assisted surgery and (2) the time of surgical operation. The output was defined as the surgical fee for each surgery. We focused on the revisions in 2014 and 2016. We first calculated each surgeon's natural logarithms of the changes in productivity, technique and efficiency in 2013-2014, in 2014-2015 and in 2015-2016. Then, we subtracted the changes in 2014-2015 from the changes in 2013-2014 and in 2015-2016. We analyzed 62 surgeons who performed 7602 surgical procedures. The productivity changes were not significantly different from 0. Their efficiency change was significantly greater than 0, while their technical change was smaller than 0 in revision 2014. Their efficiency change was significantly smaller than 0, while their technical change was greater than 0 in revision 2016 (p increase overall productivity through revision if we could increase both efficiency and technique.

  16. Control of TFTR during DT operations

    International Nuclear Information System (INIS)

    Pearson, G.G.; Alling, P.D.; Blanchard, W.; Camp, R.A.; Hawryluk, R.J.; Hosea, J.C.; Nagy, A.

    1995-01-01

    Since beginning routine D-T operations in December, 1993, there have been more than 500 DT plasmas and approximately 600,000 Ci of tritium processed through TFTR culminating in greater than 10 MW of fusion power produced in a single discharge in November, 1994. These performance levels were achieved while maintaining the highest levels of personnel and equipment safety. Prior to D-T operations, a Chain of Command structure and a TFTR Shift Supervisor (TFTRSS) position were developed for centralized control of the facility with all subsystems reporting to this position. A comprehensive surveillance system was incorporated such that the TFTR SS could easily review the operational readiness of subsystems for D-T operations. A TFTR SS Station was constructed to facilitate monitoring and control of TFTR. This station includes a camera system, FAX, a networked personal computer, a computerized tritium monitor and control system and a hardware interlock system. In the transition from D-D to D-T operations, TFTR's procedures were reviewed/revised and a number of additional procedures developed for control of activities at the facility. This paper details the equipment, administrative and organizational configurations used for controlling TFTR during D-T operations

  17. Revision allograft reconstruction of the lateral collateral ligament complex in elbows with previous failed reconstruction and persistent posterolateral rotatory instability.

    Science.gov (United States)

    Baghdadi, Yaser M K; Morrey, Bernard F; O'Driscoll, Shawn W; Steinmann, Scott P; Sanchez-Sotelo, Joaquin

    2014-07-01

    Primary reconstruction of the lateral collateral ligament complex (LCLC) using graft tissue restores elbow stability in many, but not all, elbows with acute or chronic posterolateral rotatory instability (PLRI). Revision reconstruction using a tendon allograft is occasionally considered for persistent PLRI, but the outcome of revision ligament reconstruction in this setting is largely unknown. We determined whether revision allograft ligament reconstruction can (1) restore the stability and (2) result in improved elbow scores for patients with persistent PLRI of the elbow after a previous failed primary reconstructive attempt and in the context of the diverse pathology being addressed. Between 2001 and 2011, 160 surgical elbow procedures were performed at our institution for the LCLC reconstruction using allograft tissue. Only patients undergoing revision allograft reconstruction of the LCLC for persistent PLRI with a previous failed primary reconstructive attempt using graft tissue and at least I year of followup were included in the study. Eleven patients (11 elbows) fulfilled our inclusion criteria and formed our study cohort. The cohort consisted of six female patients and five male patients. The mean age at the time of revision surgery was 36 years (range, 14-59 years). The revision allograft reconstruction was carried out after a mean of 3 years (range, 2.5 months to 9 years) from a failed attempted reconstruction of the LCLC. Osseous deficiency to some extent was identified in the preoperative radiographs of eight elbows. Mean followup was 5 years (range, 1-12 years). Revision allograft reconstruction of the LCLC restored elbow stability in eight of the 11 elbows; two of the three elbows with persistent instability were operated on a third time (at 6 and 7 months after allograft revision reconstruction). For elbows with no persistent instability, the mean Mayo Elbow Performance Score at most recent followup was 83 points (range, 60-100 points), and

  18. Training of engineers for nuclear power station operation

    International Nuclear Information System (INIS)

    Myerscough, P.B.

    1980-01-01

    The requirements for staffing and training of a nuclear electric utility are described. Current training facilities at the Central Electricity Generating Board are applicable to gas-cooled technology with the possibility of the introduction of a thermal water system and fast reactors in the future. The CEGB training centres provide for the initial training of operational staff, revision training of experienced operational staff, and training of non-operational staff from the stations and supporting departments. Details are given of the content of the training courses which also provide simulation facilities of the basic dynamics of the CEGB stations. Further developments in simulation will include dynamics of the boiler and turbine plants in Magnox stations. The flexibility of the AGR simulations will enable the training exercises to be adjusted to meet changing operating patterns for each AGR station. (U.K.)

  19. Analysis of human factor in operation of nuclear power plants

    International Nuclear Information System (INIS)

    Husseiny, A.A.; Sabri, Z.A.

    1980-01-01

    A taxonomy of operator errors is developed here to provide a scheme for compiling data from field experience according to their significance to the operation and their influence on the plant performance. The reversibility of operator actions is taken as the basis of detection of the relevances of errors to the overall operation. In addition, distinction is made between system errors, such as inadequate instrumentation or logistics, and 'operator errors', which indicate that the operator is involved in inducing an operational error rather than being uniquely responsible for an incident. The developed taxonomy can be used for evaluation of the performance of operators during scheduled training programs. Identification of each class of errors would assist in upgrading performance of operators in a given plant and in filing occurrence reports that help in revising safety provisions or operation procedures. The scheme is suitable for sorting and storing failure information in a data library for ease of retrieval by reliability analysis codes. (orig.) [de

  20. The Use of Genre-Specific Evaluation Criteria for Revision

    Science.gov (United States)

    Philippakos, Zoi A.; MacArthur, Charles A.

    2016-01-01

    Revision is a challenging step of the writing process and students often focus their attention to mechanics or grammar instead of making organizational and meaning changes. It is important for students to critically read and independently evaluate their work when revising. This practitioner article discusses the importance of genre-specific…

  1. Persistent pain and comorbidity among Operation Enduring Freedom/Operation Iraqi Freedom/operation New Dawn veterans.

    Science.gov (United States)

    Higgins, Diana M; Kerns, Robert D; Brandt, Cynthia A; Haskell, Sally G; Bathulapalli, Harini; Gilliam, Wesley; Goulet, Joseph L

    2014-05-01

    Chronic pain is a significant concern for the Veterans Health Administration (VHA), with chronic pain conditions among those most frequently reported by Operation Enduring Freedom (OEF)/Operation Iraqi Freedom (OIF)/Operation New Dawn (OND) veterans. The current study examined VHA electronic medical record data to examine variation in demographics and high prevalence and high impact medical and mental health conditions in order to characterize the differences between patients with persistent pain and no pain. A conservative operational definition of chronic or "persistent pain" based on multiple indicators of pain (i.e., pain intensity ratings, prescription opioids, pain clinic visits, International Classification of Diseases, Ninth Revision codes) was employed. Analyses included the entire roster of longitudinal clinical data on OEF/OIF/OND veterans who used VHA care to compare those with persistent pain with those with no clinical evidence of pain. Results of logistic regression models suggest that sex, race, education, military variables, body mass index (BMI), traumatic brain injury (TBI), and mental health conditions, but not age, reliably discriminate the two groups. Those with persistent pain were more likely to be Black, female, on active duty, enlisted, Army service members, have a high school education or less, and have diagnoses of mood disorders, post-traumatic stress disorder, substance use disorders, anxiety disorders, TBI, and have a BMI consistent with overweight and obesity. The operational definition of chronic pain used in this study may have research implications for examining predictors of incident and chronic pain. These data have important clinical implications in that addressing comorbid conditions of persistent pain may improve adaptive coping and functioning in these patients. Wiley Periodicals, Inc.

  2. Total hip arthroplasty revision due to infection: a cost analysis approach.

    Science.gov (United States)

    Klouche, S; Sariali, E; Mamoudy, P

    2010-04-01

    The treatment of total hip arthroplasty (THA) infections is long and costly. However,the number of studies in the literature analysing the real cost of THA revision in relation to their etiology, including infection, is limited. The aim of this retrospective study was to determine the cost of revision of infected THA and to compare these costs to those of primary THA and revision of non-infected THA. We performed a retrospective cost analysis for the year 2006 using an identical analytic accounting system in each hospital department (according to internal criteria) based on allotment of direct costs and receipts for each department. From January to December 2006, 424 primary THA, 57 non-infected THA revisions and 40 THA revisions due to infection were performed. The different cost areas of the patient's treatment were identified.This included preoperative medical work-up, medicosurgical management during hospital stay,a second stay in an orthopedic rehabilitation hospital (ORH) and post-hospitalisation antibiotic therapy after revision due to infection, as well as home-based hospitalisation (HH) costs, if this was the selected alternative option. We used the national health insurance fee schedule found in the "Common classification of medical procedures" and the "General nomenclature of professional procedures" applicable in France since September 1, 2005. Hospital costs included direct costs (hospital overhead costs) and indirect costs, (medical, surgical, technical settings and net general service expenses). The calculation of HH costs and ORH costs were based on the average daily charge of these departments. The cost of primary THA was used as the reference.We then compared our surgical costs with those found for the corresponding comparable hospital stay groups (Groupes homogènes de séjour). The average hospital stay (AHS) was 7.5 +/- 1.8 days for primary THA, 8.9 +/- 2.2 days for non-infected revisions and 30.6 +/- 14.9 days for revisions due to infection

  3. The Effects of Bloom’s Revised Taxonomy on Measurement and Evaluation in Education

    Directory of Open Access Journals (Sweden)

    İrfan Yurdabakan

    2012-12-01

    Full Text Available The aim of this study is to discuss the revision of the original version of Bloom’s taxonomy of educational objectives under the leadership of Krathwohl and Anderson and its reflections on testing and assessment in education. Fort his purpose, international database was scanned to analyze the publications on “Bloom’s revised taxonomy and relationships between the revised taxonomy and testing and assessment”. The reasons for revision, the results that emerged following the revision and the reflections of those results on measurement and evaluation in education are described within the scope of those publications obtained

  4. WASTE CERTIFICATION PROGRAM PLAN - REVISION 7

    International Nuclear Information System (INIS)

    MORGAN, LK

    2002-01-01

    The primary changes that have been made to this revision reflect the relocation of the Waste Certification Official (WCO) organizationally from the Quality Services Division (QSD) into the Laboratory Waste Services (LWS) Organization. Additionally, the responsibilities for program oversight have been differentiated between the QSD and LWS. The intent of this effort is to ensure that those oversight functions, which properly belonged to the WCO, moved with that function; but retain an independent oversight function outside of the LWS Organization ensuring the potential for introduction of organizational bias, regarding programmatic and technical issues, is minimized. The Waste Certification Program (WCP) itself has been modified to allow the waste certification function to be performed by any of the personnel within the LWS Waste Acceptance/Certification functional area. However, a single individual may not perform both the technical waste acceptance review and the final certification review on the same 2109 data package. Those reviews must be performed by separate individuals in a peer review process. There will continue to be a designated WCO who will have lead programmatic responsibility for the WCP and will exercise overall program operational oversite as well as determine the overall requirements of the certification program. The quality assurance organization will perform independent, outside oversight to ensure that any organizational bias does not degrade the integrity of the waste certification process. The core elements of the previous WCP have been retained, however, the terms and process structure have been modified.. There are now two ''control points,'' (1) the data package enters the waste certification process with the signature of the Generator Interface/Generator Interface Equivalent (GI/GIE), (2) the package is ''certified'', thus exiting the process. The WCP contains three steps, (1) the technical review for waste acceptance, (2) a review of the

  5. Revision of Oxandra (Annonaceae)

    NARCIS (Netherlands)

    Junikka, L.; Maas, P.J.M.; Maas-van de Kamer, H.; Westra, L.Y.Th.

    2016-01-01

    A taxonomic revision is given of the Neotropical genus Oxandra (Annonaceae). Within the genus 27 species are recognized, 4 of which are new to science. Most of the species are occurring in tropical South America, whereas a few (6) are found in Mexico and Central America and two in the West Indies

  6. 45 CFR 63.19 - Budget revisions and minor deviations.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Budget revisions and minor deviations. 63.19 Section 63.19 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION GRANT PROGRAMS... Budget revisions and minor deviations. Pursuant to § 74.102(d) of this title, paragraphs (b)(3) and (b)(4...

  7. Merlin C. Wittrock and the Revision of Bloom's Taxonomy

    Science.gov (United States)

    Krathwohl, David R.; Anderson, Lorin W.

    2010-01-01

    Merl Wittrock, a cognitive psychologist who had proposed a generative model of learning, was an essential member of the group that over a period of 5 years revised the "Taxonomy of Educational Objectives," originally published in 1956. This article describes the development of that 2001 revision (Anderson and Krathwohl, Editors) and Merl's…

  8. 77 FR 73454 - Revision of Information Collection; Comment Request

    Science.gov (United States)

    2012-12-10

    ... proposed revision of its Senior Corps Grant Application (424-NSSC) (OMB Control Number 3045-0035). CNCS... questions to clarify new concepts; Simplify language and wording of questions; Revise questions to better... CNCS mailroom at Room 8100 at the mail address given in paragraph (1) above, between 9:00 a.m. and 4:00...

  9. Regional sensitivity analysis using revised mean and variance ratio functions

    International Nuclear Information System (INIS)

    Wei, Pengfei; Lu, Zhenzhou; Ruan, Wenbin; Song, Jingwen

    2014-01-01

    The variance ratio function, derived from the contribution to sample variance (CSV) plot, is a regional sensitivity index for studying how much the output deviates from the original mean of model output when the distribution range of one input is reduced and to measure the contribution of different distribution ranges of each input to the variance of model output. In this paper, the revised mean and variance ratio functions are developed for quantifying the actual change of the model output mean and variance, respectively, when one reduces the range of one input. The connection between the revised variance ratio function and the original one is derived and discussed. It is shown that compared with the classical variance ratio function, the revised one is more suitable to the evaluation of model output variance due to reduced ranges of model inputs. A Monte Carlo procedure, which needs only a set of samples for implementing it, is developed for efficiently computing the revised mean and variance ratio functions. The revised mean and variance ratio functions are compared with the classical ones by using the Ishigami function. At last, they are applied to a planar 10-bar structure

  10. REVISION ANKLE SYNDESMOSIS FIXATION - FUNCTIONAL OUTCOME AFTER TIGHTROPE ® FIXATION

    Directory of Open Access Journals (Sweden)

    Sendhilvelan Rajagopalan

    2016-07-01

    Full Text Available BACKGROUND Syndesmotic disruptions are often seen in ankle fractures. Malreduction of these fractures can result in arthritis and instability. A proportion of these patients with malreduction require revision fixation. This study presents the results of revision fixation in such patients, using the Ankle TightRope ® (Arthrex system. METHODS Between January 2000 to December 2009, 124 patients who underwent ankle fracture fixations with syndesmotic stabilisation were analysed. Out of 124 patients, 8 patients were diagnosed with failure of primary stabilisation (based on radiological and clinical criteria and subjected to revision fixation using the Ankle TightRope ® (Arthrex system. Followup was done at periodic time intervals of 3, 6 and 12 months. Both clinical and radiological assessment was performed. Complications and duration of hospital stay was recorded. Functional evaluation was performed using the American Orthopaedic Foot and Ankle Society (AOFAS scoring system. RESULTS Five patients had good results, one satisfactory and two had poor outcomes. CONCLUSIONS Ankle TightRope ® fixation is an alternative method of stabilisation in patients who require revision syndesmosis fixation. Further studies are required to evaluate this method of revision stabilisation as compared to screws.

  11. Space Operations Center system analysis. Volume 3, book 2: SOC system definition report, revision A

    Science.gov (United States)

    1982-01-01

    The Space Operations Center (SOC) orbital space station program operations are described. A work breakdown structure for the general purpose support equipment, construction and transportation support, and resupply and logistics support systems is given. The basis for the design of each element is presented, and a mass estimate for each element supplied. The SOC build-up operation, construction, flight support, and satellite servicing operations are described. Detailed programmatics and cost analysis are presented.

  12. Minimally invasive presacral approach for revision of an Axial Lumbar Interbody Fusion rod due to fall-related lumbosacral instability: a case report

    Directory of Open Access Journals (Sweden)

    Cohen Anders

    2011-09-01

    Full Text Available Abstract Introduction The purpose of this study was to describe procedural details of a minimally invasive presacral approach for revision of an L5-S1 Axial Lumbar Interbody Fusion rod. Case presentation A 70-year-old Caucasian man presented to our facility with marked thoracolumbar scoliosis, osteoarthritic changes characterized by high-grade osteophytes, and significant intervertebral disc collapse and calcification. Our patient required crutches during ambulation and reported intractable axial and radicular pain. Multi-level reconstruction of L1-4 was accomplished with extreme lateral interbody fusion, although focal lumbosacral symptoms persisted due to disc space collapse at L5-S1. Lumbosacral interbody distraction and stabilization was achieved four weeks later with the Axial Lumbar Interbody Fusion System (TranS1 Inc., Wilmington, NC, USA and rod implantation via an axial presacral approach. Despite symptom resolution following this procedure, our patient suffered a fall six weeks postoperatively with direct sacral impaction resulting in symptom recurrence and loss of L5-S1 distraction. Following seven months of unsuccessful conservative care, a revision of the Axial Lumbar Interbody Fusion rod was performed that utilized the same presacral approach and used a larger diameter implant. Minimal adhesions were encountered upon presacral re-entry. A precise operative trajectory to the base of the previously implanted rod was achieved using fluoroscopic guidance. Surgical removal of the implant was successful with minimal bone resection required. A larger diameter Axial Lumbar Interbody Fusion rod was then implanted and joint distraction was re-established. The radicular symptoms resolved following revision surgery and our patient was ambulating without assistance on post-operative day one. No adverse events were reported. Conclusions The Axial Lumbar Interbody Fusion distraction rod may be revised and replaced with a larger diameter rod using

  13. Yakima Fisheries Project : Revised Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-05-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. The Yakima Fisheries Project (YFP), included in the Northwest Power Planning Council`s fish and wildlife program, would be jointly managed by the State of Washington and the Yakima Indian Nation. Fisheries resources in the Yakima River are severely reduced from historical levels and there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) the construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. The project has been considerably revised from the original proposal described in the first draft EIS. Examined in addition to No Action (which would leave present anadromous fisheries resources unchanged in the, Basin) are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of re-establishing (via stock imported from another basin) naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 has been identified as the preferred action. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

  14. Revised dietary guidelines for Koreans.

    Science.gov (United States)

    Jang, Young Ai; Lee, Haeng Shin; Kim, Bok Hee; Lee, Yoonna; Lee, Hae Jeung; Moon, Jae Jin; Kim, Cho-il

    2008-01-01

    With rapidly changing dietary environment, dietary guidelines for Koreans were revised and relevant action guides were developed. First, the Dietary Guidelines Advisory Committee was established with experts and government officials from the fields of nutrition, preventive medicine, health promotion, agriculture, education and environment. The Committee set dietary goals for Koreans aiming for a better nutrition state of all after a thorough review and analysis of recent information related to nutritional status and/or problems of Korean population, changes in food production/supply, disease pattern, health policy and agricultural policy. Then, the revised dietary guidelines were proposed to accomplish these goals in addition to 6 different sets of dietary action guides to accommodate specific nutrition and health problems of respective age groups. Subsequently, these guidelines and guides were subjected to the focus group review, consumer perception surveys, and a public hearing for general and professional comments. Lastly, the language was clarified in terms of public understanding and phraseology. The revised Dietary guidelines for Koreans are as follows: eat a variety of grains, vegetables, fruits, fish, meat, poultry and dairy products; choose salt-preserved foods less, and use less salt when you prepare foods; increase physical activity for a healthy weight, and balance what you eat with your activity; enjoy every meal, and do not skip breakfast; if you drink alcoholic beverages, do so in moderation; prepare foods properly, and order sensible amounts; enjoy our rice-based diet.

  15. Safety of Nuclear Power Plants: Commissioning and Operation. Specific Safety Requirements (Arabic Edition)

    International Nuclear Information System (INIS)

    2017-01-01

    This publication is a revision of IAEA Safety Standards Series No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe commissioning, operation, and transition from operation to decommissioning of nuclear power plants. Over recent years there have been developments in areas such as long term operation of nuclear power plants, plant ageing, periodic safety review, probabilistic safety analysis review and risk informed decision making processes. It became necessary to revise the IAEA’s Safety Requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the IAEA Safety Standards Series No. SF-1, Fundamental Safety Principles. A review of Safety Requirements publications, initiated in 2011 following the accident in the Fukushima Daiichi nuclear power plant in Japan, revealed no significant areas of weakness but resulted in a small set of amendments to strengthen the requirements and facilitate their implementation. These are contained in the present publication.

  16. Examining the Impact of Technology on Primary Students' Revision of Written Work

    Science.gov (United States)

    Lisy, Jennifer Garrette

    2015-01-01

    Few studies have examined the revision processes of second grade students and even fewer have explored the impact of digital writing on young students' revisions. This study utilized a within subject crossover trial using randomized block assignment (AB | BA) for counterbalancing. This study sought to determine (1) whether revising on paper versus…

  17. Spent Nuclear Fuel Project Cold Vacuum Drying Facility Operations Manual

    International Nuclear Information System (INIS)

    IRWIN, J.J.

    1999-01-01

    This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-553, Spent Nuclear Fuel Project Final Safety Analysis Report Annex B--Cold Vacuum Drying Facility. The HNF-SD-SNF-DRD-002, 1999, (Cold Vacuum Drying Facility Design Requirements), Rev. 4. and the CVDF Final Design Report. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence and references to the CVDF System Design Descriptions (SDDs). This manual has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved

  18. Validity and Reliability of Revised Inventory of Learning Processes.

    Science.gov (United States)

    Gadzella, B. M.; And Others

    The Inventory of Learning Processes (ILP) was developed by Schmeck, Ribich, and Ramanaiah in 1977 as a self-report inventory to assess learning style through a behavioral-oriented approach. The ILP was revised by Schmeck in 1983. The Revised ILP contains six scales: (1) Deep Processing; (2) Elaborative Processing; (3) Shallow Processing; (4)…

  19. Evaluation of revised trauma score in poly- traumatized patients

    International Nuclear Information System (INIS)

    Ahmad, H.N.

    2004-01-01

    Objective: To determine the prognostic value and reliability of revised trauma score (RTS) in polytraumatized patients. Subjects and Methods: Thirty adult patients of road traffic accidents sustaining multisystem injuries due to high energy blunt trauma were managed according to the protocols of advanced trauma life support (ATLS) and from their first set of data RTS was calculated. Score of each patient was compared with his final outcome at the time of discharge from the hospital. Results: The revised trauma score was found to be a reliable predictor of prognosis of polytraumatized patients but a potentially weak predictor for those patients having severe injury involving a single anatomical region. The higher the RTS the better the prognosis of polytrauma patient and vice versa. Revised trauma score <8 turned out to be an indicator of severe injury with high mortality and morbidity and overall mortality in polytraumatized patients was 26.66%. However, RTS-6 was associated with 50% mortality. Conclusion: The revised trauma score is a reliable indicator of prognosis of polytraumatized patients. Therefore, it can be used for field and emergency room triage. (author)

  20. Rag Deletion in Peripheral T Cells Blocks TCR Revision

    Science.gov (United States)

    Hale, J. Scott; Ames, Kristina T.; Boursalian, Tamar E.; Fink, Pamela J.

    2010-01-01

    Mature CD4+Vβ5+ T cells that recognize a peripherally expressed endogenous superantigen are tolerized either by deletion or T cell receptor (TCR) revision. In Vβ5 transgenic mice, this latter tolerance pathway results in the appearance of CD4+Vβ5−TCRβ+ T cells, coinciding with Rag1, Rag2, and TdT expression and the accumulation of Vβ-DJβ recombination intermediates in peripheral CD4+ T cells. Because post-thymic RAG-dependent TCR rearrangement has remained controversial, we sought to definitively determine whether TCR revision is an extrathymic process that occurs in mature peripheral T cells. We now show that Rag deletion in post-positive selection T cells in Vβ5 transgenic mice blocks TCR revision in vivo, and that mature peripheral T cells sorted to remove cells bearing endogenous TCRβ chains can express newly generated TCRβ molecules in adoptive hosts. These findings unambiguously demonstrate post-thymic, RAG-dependent TCR rearrangement and define TCR revision as a tolerance pathway that targets mature peripheral CD4+ T cells. PMID:20435935

  1. 77 FR 15273 - Oklahoma: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2012-03-15

    ...: Final Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental... hazardous waste management program. We authorized the following revisions: Oklahoma received authorization... its program revision in accordance with 40 CFR 271.21. The Oklahoma Hazardous Waste Management Act...

  2. Concurrent validity of the Snijders-Oomen Nonverbal Intelligence Test 2 1/2-7-Revised with the Wechsler Preschool and Primary Scale of Intelligence - Revised

    NARCIS (Netherlands)

    Moore, C; O'Keefe, SL; Lawhon, D; Tellegen, P

    This study examined the concurrent validity of the Snijders-Oomen Nonverbal Intelligence Test-Revised compared to the Wechsler Preschool and Primary Scale of Intelligence-Revised Subjects were 25 4-yr.-olds of lower, lower-middle, and middle socioeconomic status from both urban and rural areas of

  3. Revised legislation affecting the transport of radioactive materials

    International Nuclear Information System (INIS)

    Rowlands, R.P.

    1976-01-01

    The revised edition of the model Regulations for the safe transport of radioactive materials (1973, Vienna, International Atomic Energy Agency Safety Series no.6) has acted as the basis for the conditions of carriage and regulatory requirements in Great Britain. The changes introduced in this revised edition are discussed, and the current Regulations and Codes of Practice covering U.K. and international transport by road, sea, rail and air reviewed. (U.K.)

  4. Preservation of the Acetabular Cup During Revision Total Hip Arthroplasty Using a Novel Mini-navigation Tool: A Case Report.

    Science.gov (United States)

    Vincent, John; Alshaygy, Ibrahim; Muir, Jeffrey M; Kuzyk, Paul

    2018-01-01

    While intraoperative navigation systems have been shown to improve outcomes in primary total hip arthroplasty (THA), their use in the context of revision has been largely overlooked. This case report presents the first documented use of an imageless navigation tool in the context of revision THA, and an unexpected benefit to the surgical procedure as a result. An 84-year-old female patient presented following five episodes of dislocation of the left hip and with pain in the left buttock, groin, and posterior aspect of her hip. Relevant surgical history included primary hip arthroplasty in 1999 and the first revision in 2014. Preoperative analysis revealed a constrained liner that had become disengaged and migrated inferiorly, lodging at the distal aspect of the femoral neck. Acetabular protrusion was also noted. The pre-operative plan included the replacement of the fragmented liner and likely of the acetabular cup due to hardware failure. Intraoperative assessment, however, revealed that the cup was in good condition and would be difficult to remove due to substantial bony ingrowth. With the assistance of imageless navigation, the orientation of the acetabular cup was determined and a new constrained liner was cemented into the preexisting acetabular component at an altered orientation, correcting anteversion by 7°. In revision hip arthroplasty cases, image-based navigation is limited by the presence of existing implants and corresponding metal artefact. This case demonstrates the successful use of an imageless navigation tool for revision surgery. Use of navigation led to the unexpected intraoperative discovery that the acetabular cup was in an acceptable state, and allowed the surgical team to correct the position of the cup using a constrained liner, thus preserving the cup. This significantly benefitted patient outcome, due to the risks associated with the removal of a firmly fixated acetabular cup. While more extensive research is required, this case

  5. Operation of Wastewater Treatment Plants. Volume 1. A Field Study Training Program. Third Edition. Revised.

    Science.gov (United States)

    California State Univ., Sacramento. Dept. of Civil Engineering.

    The purpose of this wastewater treatment field study training program is to: (1) develop new qualified wastewater treatment plant operators; (2) expand the abilities of existing operators, permitting better service both to employers and public; and (3) prepare operators for civil service and certification examinations (examinations administered by…

  6. System for managing operation of instrument in atomic power plant facility

    International Nuclear Information System (INIS)

    Shinzawa, Katsuo.

    1982-01-01

    Purpose: To facilitate the management of the operating state of instruments operated in a site without necessity of large revision and additional cables of the instruments. Constitution: Tag-shaped instrument recognition indicators and instrument operation indicators for indicating the operating states of the respective instruments are mounted on the instruments such as openable valves. Each instrument recognition indicator represents the type and symbol of the instrument, and each instrument operation indicator represents the operating state such as open state or closed state of the valve of theinstrument. A reader reads a recorded data when the reader is touched to a magnetic plate and a magnetic sheet, and the data is recorded by a recorder on the magnetic tape. In this manner, the leakage of checking the data can be prevented, and the load of an operator can be alleviated. (Kamimura, M.)

  7. Revised version of quality guidelines for presurgical epilepsy evaluation and surgical epilepsy therapy issued by the Austrian, German, and Swiss working group on presurgical epilepsy diagnosis and operative epilepsy treatment.

    Science.gov (United States)

    Rosenow, Felix; Bast, Thomas; Czech, Thomas; Feucht, Martha; Hans, Volkmar H; Helmstaedter, Christoph; Huppertz, Hans-Jürgen; Noachtar, Soheyl; Oltmanns, Frank; Polster, Tilman; Seeck, Margitta; Trinka, Eugen; Wagner, Kathrin; Strzelczyk, Adam

    2016-08-01

    The definition of minimal standards remains pivotal as a basis for a high standard of care and as a basis for staff allocation or reimbursement. Only limited publications are available regarding the required staffing or methodologic expertise in epilepsy centers. The executive board of the working group (WG) on presurgical epilepsy diagnosis and operative epilepsy treatment published the first guidelines in 2000 for Austria, Germany, and Switzerland. In 2014, revised guidelines were published and the WG decided to publish an unaltered English translation in this report. Because epilepsy surgery is an elective procedure, quality standards are particularly high. As detailed in the first edition of these guidelines, quality control relates to seven different domains: (1) establishing centers with a sufficient number of sufficiently and specifically trained personnel, (2) minimum technical standards and equipment, (3) continuous medical education of employees, (4) surveillance by trained personnel during video electroencephalography (EEG) monitoring (VEM), (5) systematic acquisition of clinical and outcome data, (6) the minimum number of preoperative evaluations and epilepsy surgery procedures, and (7) the cooperation of epilepsy centers. These standards required the certification of the different professions involved and minimum numbers of procedures. In the subsequent decade, quite a number of colleagues were certified by the trinational WG; therefore, the executive board of the WG decided in 2013 to make these standards obligatory. This revised version is particularly relevant given that the German procedure classification explicitly refers to the guidelines of the WG with regard to noninvasive/invasive preoperative video-EEG monitoring and invasive intraoperative diagnostics in epilepsy. Wiley Periodicals, Inc. © 2016 International League Against Epilepsy.

  8. 78 FR 32161 - Oklahoma: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2013-05-29

    ... Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental Protection Agency (EPA... waste management program. We authorized the following revisions: Oklahoma received authorization for... authorization of its program revision in accordance with 40 CFR 271.21. The Oklahoma Hazardous Waste Management...

  9. 76 FR 16845 - Administrator's Line of Succession Designation, No. 1-A, Revision 32

    Science.gov (United States)

    2011-03-25

    ... SMALL BUSINESS ADMINISTRATION Administrator's Line of Succession Designation, No. 1-A, Revision 32 This document replaces and supersedes ``Line of Succession Designation No. 1-A, Revision 31.'' Line of Succession Designation No. 1-A, Revision 32 Effective immediately, the Administrator's Line of Succession...

  10. 77 FR 44305 - Administrator's Line of Succession Designation, No. 1-A, Revision 34

    Science.gov (United States)

    2012-07-27

    ... SMALL BUSINESS ADMINISTRATION Administrator's Line of Succession Designation, No. 1-A, Revision 34 This document replaces and supersedes ``Line of Succession Designation No. 1-A, Revision 33.'' Line of Succession Designation No. 1-A, Revision 34: Effective immediately, the Administrator's Line of Succession...

  11. 77 FR 20474 - Administrator's Line of Succession Designation, No. 1-A, Revision 33

    Science.gov (United States)

    2012-04-04

    ... SMALL BUSINESS ADMINISTRATION Administrator's Line of Succession Designation, No. 1-A, Revision 33 This document replaces and supersedes ``Line of Succession Designation No. 1-A, Revision 32.'' Line of Succession Designation No. 1-A, Revision 33: Effective immediately, the Administrator's Line of Succession...

  12. Modeling data revisions : Measurement error and dynamics of "true" values

    NARCIS (Netherlands)

    Jacobs, Jan P. A. M.; van Norden, Simon

    Policy makers must base their decisions on preliminary and partially revised data of varying reliability. Realistic modeling of data revisions is required to guide decision makers in their assessment of current and future conditions. This paper provides a new framework with which to model data

  13. 75 FR 81126 - Revisions to Lead Ambient Air Monitoring Requirements

    Science.gov (United States)

    2010-12-27

    ... tons per year of lead is necessary to provide sufficient information about airborne lead levels near... Revisions to Lead Ambient Air Monitoring Requirements AGENCY: Environmental Protection Agency (EPA). ACTION...) that revised the primary and secondary National Ambient Air Quality Standards (NAAQS) for lead and...

  14. Innovative Telemonitoring System for Cardiology: From Science to Routine Operation

    Science.gov (United States)

    Kastner, P.; Morak, J.; Modre, R.; Kollmann, A.; Ebner, C.; Fruhwald, FM.; Schreier, G.

    2010-01-01

    Objective Results of the Austrian MOBITEL (MOBIle phone based TELemonitoring for heart failure patients) trial indicate that home-based telemonitoring improves outcome of chronic heart failure (CHF) patients and reduces both frequency and duration of hospitalizations. Based on lessons learned, we assessed the weak points to clear the way for routine operations. Methods We analyzed the system with respect to recommendations of the ESC Guidelines and experiences gained throughout the trial to identify potential improvements. The following components have been identified: a patient terminal with highest usability, integrated way to document drug-intake and well-being, and automated event detection for worsening of CHF. As a consequence the system was extended by Near Field Communication (NFC) technology and by an event management tool. Results Usability evaluation with 30 adults (14f, median 51y. IQR[45-65]) showed that 21 (8f) were able to immediately operate the system after reading a step-by-step manual. Eight (6f) needed one time demonstration and one man (80y) failed to operate the blood pressure meter. Routine operation of the revised system started in March 2009. Within 9 months, 15 patients (4f, median 74y. IQR[71-83], all NYHA-III) transmitted 17,149 items. 43 events were detected because of body weight gain of more then 2kg within 2 days. 49 therapy adjustments were documented. Three patients stopped using the system, two (1f) because of non-compliance and one (m, 82y) because of death. Overall, the rate of adherence to daily data transfer was 78%. Conclusion First results confirm the applicability of the revised telemonitoring system in routine operation. PMID:23616835

  15. Excellent Aesthetic and Functional Outcome After Fractionated Carbon Dioxide Laser Skin Graft Revision Surgery: Case Report and Review of Laser Skin Graft Revision Techniques.

    Science.gov (United States)

    Ho, Derek; Jagdeo, Jared

    2015-11-01

    Skin grafts are utilized in dermatology to reconstruct a defect secondary to surgery or trauma of the skin. Common indications for skin grafts include surgical removal of cutaneous malignancies, replacement of tissue after burns or lacerations, and hair transplantation in alopecia. Skin grafts may be cosmetically displeasing, functionally limiting, and significantly impact patient's quality-of-life. There is limited published data regarding skin graft revision to enhance aesthetics and function. Here, we present a case demonstrating excellent aesthetic and functional outcome after fractionated carbon dioxide (CO2) laser skin graft revision surgery and review of the medical literature on laser skin graft revision techniques.

  16. Fast-track revision knee arthroplasty

    DEFF Research Database (Denmark)

    Husted, Henrik; Otte, Niels Kristian Stahl; Kristensen, Billy B

    2011-01-01

    Abstract Background and purpose Fast-track surgery has reduced the length of hospital stay (LOS), morbidity, and convalescence in primary hip and knee arthroplasty (TKA). We assessed whether patients undergoing revision TKA for non-septic indications might also benefit from fast-track surgery...

  17. Discussion on some issues for HAF003 revision

    International Nuclear Information System (INIS)

    Huang Chaoyun, Wang Xiaotao; Duan Hongwei; Tian Feng

    2013-01-01

    This paper describes some key issues which should be considered during the revision of safety code Quality Assurance for Nuclear Power Plant (HAF003), based on the comparatively analysis and research on the quality assurance practice for nuclear power. It covers about 24 issues including management responsibilities, independent assessment, design control and procurement control etc. and is expected to provide some reference and proposal for HAF003 revision activities organized by National Nuclear Safety Agency (NNSA). (authors)

  18. An interim UK response to revised risk estimates

    International Nuclear Information System (INIS)

    Beaver, P.F.; Bines, W.P.

    1992-01-01

    This paper describes the legal framework in place when the revised risk estimates were announced by the International Commission for Radiological Protection (ICRP) in 1987 and how an addition to that framework enabled the revised risk estimates to be taken into account when making decisions about radiation protection practice both at plant and individual worker level. It is suggested that this a may be an early example of the use of a constraint applied generically. (author)

  19. California State Implementation Plan; San Diego County Air Pollution Control District; VOC Emissions from Polyester Resin Operations

    Science.gov (United States)

    EPA is taking final action to approve revisions to the San Diego County Air Pollution Control District (SDCAPCD) portion of the California SIP concerning volatile organic compound (VOC) emissions from polyester resin operations.

  20. MITI revises outlooks for energy and power demand

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    The Ministry of International Trade and Industry has revised downward its long-term outlook on energy supply and demand, lowering the estimated primary energy demand for fiscal 2000 from 600 million tons in oil equivalent to 540 MTOE, and reducing total power demand for fiscal 2000 from 899.1 billion kWh to 838 billion. In this content, the outlook for installed nuclear capacity has been revised downward from 62,000 MW to 53,500 MW. This revision of the power supply-demand outlook was reported on Oct. 1 to the supply and demand committee (Chairman - Yoshihiko Morozumi, Adviser to Nippon Schlum-berger) of the Electric Utility Industry Council; the energy supply-demand outlook was decided on Oct. 14 by the MITI Supply and Demand Subcommittee of the Advisory Committee for Energy and reported on Oct. 16 to the conference of ministers concerned with energy. (author)

  1. NEEDLE REVISION WITH MITOMYCIN-C IN ENCAPSULATED BLEBS

    Directory of Open Access Journals (Sweden)

    R Zarei

    2008-08-01

    Full Text Available "nThe most common cause of failure during the first trimester after trabeculectomy is encapsulated bleb and needling bleb revision is a less invasive method in the management of refractory cases. The purpose of this study is to determine the efficacy and safety of mitomycin-C (MMC augmented bleb revision of failed filtration surgery. This study is a before-after (paired observation. 33 patients with failed trabeculectomy because of bleb encapsulation, whose intraocular pressure (IOP was not reduced under 21 mmHg despite of medications and digital massage , underwent needling bleb revision and subconjunctival injection of 0.1 ml MMC (0.4 mg/ml.The mean follow-up time was 9.24 ± 5.27 months (1-20 months. Statistical analysis of the data included the paired two-tailed Student's t test for preoperative and postoperative IOP and number of medications. 36 needling procedures (mean, 1.09 ± 0.21 revisions per eye were performed on 33 eyes. Patients were between 10-80 years old (mean, 45.67 ± 22.41 years and mean follow-up was 9.24 ± 5.27 months. IOP decreased from 29.06 ± 5.03 mmHg to 18.21 ± 6.76 mmHg at last follow-up (P= 0.000. Antiglaucoma medications decreased from 2.18 ± 0.58 to 1.36 ± 0.29 at last follow-up (P= 0.000.Overall, 6 (18.2% of 33 cases achieved a complete success and 20 (60.6% of cases achieved a qualified success. The complications of this procedure were subconjunctival hemorrhage (17 cases, hyphema (5 cases and conjunctival button hole (2 cases. Needling bleb revision with mitomycin-C appears to be an effective and relatively safe way to revive failed filtration surgery.

  2. Patterns of functional improvement after revision knee arthroplasty.

    Science.gov (United States)

    Ghomrawi, Hassan M K; Kane, Robert L; Eberly, Lynn E; Bershadsky, Boris; Saleh, Khaled J

    2009-12-01

    Despite the increase in the number of total knee arthroplasty revisions, outcomes of such surgery and their correlates are poorly understood. The aim of this study was to characterize patterns of functional improvement after revision total knee arthroplasty over a two-year period and to investigate factors that affect such improvement patterns. Three hundred and eight patients in need of revision surgery were enrolled into the study, conducted at seventeen centers, and 221 (71.8%) were followed for two years. Short Form-36 (SF-36), Western Ontario and McMaster Universities Osteoarthritis Index (WOMAC), and Lower-Extremity Activity Scale (LEAS) scores were collected at baseline and every six months for two years postoperatively. A piecewise general linear mixed model, which models correlation between repeated measures and estimates separate slopes for different follow-up time periods, was employed to examine functional improvement patterns. Separate regression slopes were estimated for the zero to twelve-month and the twelve to twenty-four-month periods. The slopes for zero to twelve months showed significant improvement in all measures in the first year. The slopes for twelve to twenty-four months showed deterioration in the scores of the WOMAC pain subscale (slope = 0.67 +/- 0.21, p coefficient = -5.46 +/- 1.91, p coefficient = 5.41 +/- 2.35, p coefficient = 1.42 +/- 0.69, p < 0.05]). Factors related to the surgical technique did not predict outcomes. The onset of worsening pain and knee-specific function in the second year following revision total knee arthroplasty indicates the need to closely monitor patients, irrespective of the mode of failure of the primary procedure or the surgical technique for the revision. This information may be especially important for patients with multiple comorbidities.

  3. Carlsbad Area Office strategic plan, March 1995. Revision 1

    International Nuclear Information System (INIS)

    1995-03-01

    This edition of the Carlsbad Area Office Strategic Plan captures the US Department of Energy's (DOE's) new focus, and supersedes the edition issued previously (DOE, 1993a). This revision reflects: a revised strategy designed to demonstrate compliance with environmental regulations earlier than the previous course of action; and a focus on establishment of standardized transuranic waste characterization and acceptance criteria for disposal facilities

  4. Actitud Hacia las Matematicas: Revision Bibliografica (Attitudes Toward Mathematics: Revised Bibliography). Publication No. 39.

    Science.gov (United States)

    Rodriguez Feijoo, Nelida

    Investigations about attitudes toward mathematics carried out in the past decade were revised. The instruments used to measure attitudes toward mathematics were analysed as well as the attitudes toward different aspects of mathematics, their relation with other school subjects and their stability through time. Opinions about the influence of…

  5. Do Writers Really Revise? Encouraging Unnatural Acts in Your Classroom.

    Science.gov (United States)

    Balajthy, Ernest

    Unless students have an appropriate attitude toward revision--the keystone of the writing process--teachers who institute writing process approaches face frustration and failure. Implementing the following suggestions may help increase revision in the classroom. First, while the mature writing process is not strictly linear, students developing…

  6. A revision of the Pliocene and Quaternary Lutrinae from Europe

    NARCIS (Netherlands)

    Willemsen, G.F.

    1992-01-01

    In this paper, a revision of the Pliocene and Quaternary Lutrinae from Europe is presented. Such a revision, including fossil material, has not been published since the work of Pohle (1919). Three tribes within the Lutrinae are recognized: the Lutrini, the Aonyxini and the Enhydrini. The latter

  7. Questions and answers based on revised 10 CFR Part 20

    International Nuclear Information System (INIS)

    Borges, T.; Stafford, R.S.; Lu, P.Y.; Carter, D.

    1994-05-01

    NUREG/CR-6204 is a collection of questions and answers that were originally issued in seven sets and which pertain to revised 10 CFR Part 20. The questions came from both outside and within the NRC. The answers were compiled and provided by NRC staff within the offices of Nuclear Reactor Regulation, Nuclear Material Safety and Safeguards, Nuclear Regulatory Research, the Office of State Programs, and the five regional offices. Although all of the questions and answers have been reviewed by attorneys in the NRC Office of the General Counsel, they do not constitute official legal interpretations relevant to revised 10 CFR Part 20. The questions and answers do, however, reflect NRC staff decisions and technical options on aspects of the revised 10 CFR Part 20 regulatory requirements. This NUREG is being made available to encourage communication among the public, industry, and NRC staff concerning the major revisions of the NRC's standards for protection against radiation

  8. 77 FR 26448 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-05-04

    ...EPA is taking direct final action to approve revisions to the Antelope Valley Air Quality Management District (AVAQMD), Eastern Kern Air Pollution Control District (EKAPCD), and Santa Barbara County Air Pollution Control District (SBCAPCD) portions of the California State Implementation Plan (SIP). Under authority of the Clean Air Act as amended in 1990 (CAA or the Act), we are approving local rules that define terms used in other air pollution regulation in these areas and approving a rule rescission that addresses Petroleum Coke Calcining Operations--Oxides of Sulfur.

  9. Revision for prosthetic joint infection following hip arthroplasty: Evidence from the National Joint Registry.

    Science.gov (United States)

    Lenguerrand, E; Whitehouse, M R; Beswick, A D; Jones, S A; Porter, M L; Blom, A W

    2017-06-01

    We used the National Joint Registry for England, Wales, Northern Ireland and the Isle of Man (NJR) to investigate the risk of revision due to prosthetic joint infection (PJI) for patients undergoing primary and revision hip arthroplasty, the changes in risk over time, and the overall burden created by PJI. We analysed revision total hip arthroplasties (THAs) performed due to a diagnosis of PJI and the linked index procedures recorded in the NJR between 2003 and 2014. The cohort analysed consisted of 623 253 index primary hip arthroplasties, 63 222 index revision hip arthroplasties and 7585 revision THAs performed due to a diagnosis of PJI. The prevalence, cumulative incidence functions and the burden of PJI (total procedures) were calculated. Overall linear trends were investigated with log-linear regression. We demonstrated a prevalence of revision THA due to prosthetic joint infection of 0.4/100 procedures following primary and 1.6/100 procedures following revision hip arthroplasty. The prevalence of revision due to PJI in the three months following primary hip arthroplasty has risen 2.3-fold (95% confidence interval (CI) 1.3 to 4.1) between 2005 and 2013, and 3.0-fold (95% CI 1.1 to 8.5) following revision hip arthroplasty. Over 1000 procedures are performed annually as a consequence of hip PJI, an increase of 2.6-fold between 2005 and 2013. Although the risk of revision due to PJI following hip arthroplasty is low, it is rising and, coupled with the established and further predicted increased incidence of both primary and revision hip arthroplasty, this represents a growing and substantial treatment burden. Cite this article : E. Lenguerrand, M. R. Whitehouse, A. D. Beswick, S. A. Jones, M. L. Porter, A. W. Blom. Revision for prosthetic joint infection following hip arthroplasty: Evidence from the National Joint Registry. Bone Joint Res 2017;6:391-398. DOI: 10.1302/2046-3758.66.BJR-2017-0003.R1. © 2017 Lenguerrand et al.

  10. Failure of operative treatment for glenohumeral instability: etiology and management.

    Science.gov (United States)

    Shah, Apurva S; Karadsheh, Mark S; Sekiya, Jon K

    2011-05-01

    Failure of primary shoulder stabilization procedures is often related to uncorrected anatomic pathology. Orthopaedic surgeons must recognize excessive capsular laxity or large glenohumeral bone defects preoperatively to avoid recurrence of instability. When history, physical examination, and radiographic evaluation are used in conjunction, patients at risk for failure can be identified. The instability severity index score permits precise identification of patients at risk. When treating patients in whom prior surgical intervention has failed, the success of revision procedures correlates to the surgeon's ability to identify the essential pathology and use lesion-specific treatment strategies. Revision procedures remain technically demanding. Keen preoperative and intraoperative judgment is required to avoid additional recurrence of instability after revision procedures, particularly because results deteriorate with each successive operation. Glenoid or humeral defects with greater than 25% bone loss compromise stability provided through the mechanism of concavity compression. These defects must be specifically addressed to avoid recurrence of instability. We prefer anatomic reconstruction techniques combined with capsulolabral repair and, if bone defects are present, anatomic reconstruction with osteochondral allograft. Copyright © 2011 Arthroscopy Association of North America. Published by Elsevier Inc. All rights reserved.

  11. Designing Automated Guidance to Promote Productive Revision of Science Explanations

    Science.gov (United States)

    Tansomboon, Charissa; Gerard, Libby F.; Vitale, Jonathan M.; Linn, Marcia C.

    2017-01-01

    Supporting students to revise their written explanations in science can help students to integrate disparate ideas and develop a coherent, generative account of complex scientific topics. Using natural language processing to analyze student written work, we compare forms of automated guidance designed to motivate productive revision and help…

  12. RCRA facility investigation report for the 200-PO-1 operable unit. Revision 1

    International Nuclear Information System (INIS)

    1997-05-01

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) report is prepared in support of the RFI/corrective measures study process for the 200-PO-1 Groundwater Operable Unit in the 200 East Area of the Hanford Site. This report summarizes existing information on this operable unit presented in the 200 East and PUREX Aggregate Area Management Study Reports, contaminant specific studies, available modeling data, and groundwater monitoring data summary reports. Existing contaminant data are screened against current regulatory limits to determine contaminants of potential concern (COPC). Each identified COPC is evaluated using well-specific and plume trend analyses

  13. ICD-11 (JLMMS) and SCT Inter-Operation.

    Science.gov (United States)

    Mamou, Marzouk; Rector, Alan; Schulz, Stefan; Campbell, James; Solbrig, Harold; Rodrigues, Jean-Marie

    2016-01-01

    The goal of this work is to contribute to a smooth and semantically sound inter-operability between the ICD-11 (International Classification of Diseases-11th revision Joint Linearization for Mortality, Morbidity and Statistics) and SNOMED CT (SCT). To guarantee such inter-operation between a classification, characterized by a single hierarchy of mutually exclusive and exhaustive classes, as is the JLMMS successor of ICD-10 on the one hand, and the multi-hierarchical, ontology-based clinical terminology SCT on the other hand, we use ontology axioms that logically express generalizable truths. This is expressed by the compositional grammar of SCT, together with queries on axiomsof SCT. We test the feasibility of the method on the circulatory chapter of ICD-11 JLMMS and present limitations and results.

  14. Long-term Follow-up of Revision Osteochondral Allograft Transplantation of the Ankle.

    Science.gov (United States)

    Gaul, Florian; Tírico, Luís E P; McCauley, Julie C; Bugbee, William D

    2018-05-01

    Osteochondral allograft (OCA) transplantation is a useful alternative for treatment of posttraumatic ankle arthritis in young patients but has a relatively high failure rate and further procedures are often required. The purpose of this study was to evaluate outcomes of patients who underwent revision OCA transplantation of the ankle after failed primary OCA transplantation. Twenty patients underwent revision OCA transplantation of the ankle between 1988 and 2015. Mean age was 44 years, 55% (11 of 20) were female. The mean time from primary to revision OCA was 3.0 ± 1.7 years. All patients had a minimum follow-up of 2 years. Outcomes included the American Academy of Orthopaedic Surgeons Foot and Ankle Module (AAOS-FAM) and questionnaires evaluating pain and satisfaction. Failure of the revision OCA was defined as a conversion to arthroplasty, arthrodesis, or amputation. Ten of 20 ankles required further surgery, of which 30% (6 of 20) were considered OCA revision failures (4 arthrodeses, 1 arthroplasty, and 1 amputation). The mean time to failure was 6.7 (range, 0.6-13.1) years. Survivorship of the revision OCA was 84% at 5 years and 65% at 10 years. The 14 patients with grafts remaining in situ had an average follow-up of 10.3 years; mean AAOS-FAM Core Score was 70.5 (range, 42.3-99). Of the patients who answered the follow-up questions, 4 of 7 reported moderate to severe pain, and 5 of 12 were satisfied with the results of the procedure. Although the results of revision ankle OCA transplantation are not inferior to primary OCA transplantation, the high rates of persistent pain, further surgery, and graft failure suggest that the indications for OCA as a revision procedure should be carefully evaluated, with proper patient selection. Considering the treatment alternatives, revising a failed OCA transplantation can be a useful treatment option, especially for young and active patients who wish to avoid arthrodesis or arthroplasty. Level IV, case series.

  15. Midterm Clinical and Radiographic Results of Mobile-Bearing Revision Total Knee Arthroplasty.

    Science.gov (United States)

    Kim, Raymond H; Martin, J Ryan; Dennis, Douglas A; Yang, Charlie C; Jennings, Jason M; Lee, Gwo-Chin

    2017-06-01

    Constrained implants are frequently required in revision total knee arthroplasty (TKA) and are associated with an increase in aseptic component loosening and damage or wear to the constraining mechanisms, compared with primary TKA. The purpose of the following study was to evaluate the midterm clinical and radiographic results including the incidence of bearing complications in a group of patients undergoing revision TKA using mobile-bearing revision TKA implants. We retrospectively reviewed 316 consecutive mobile-bearing revision TKAs performed at 2 centers between 2006 and 2010. There were 183 women and 133 men with a mean age of 66 years. The patients were evaluated clinically using the Knee Society scores. A radiographic analysis was performed. Bearing specific complications (ie, instability or dislocation) were recorded. Patients were followed-up for a minimum of 24 months and a median of 59.88 months (range 24-121.2). The average Knee Society knee score and function scores increased from 40.8 and 47.9 points preoperatively to 80 points and 70.3 points, respectively (P bearing complications were observed. Revision TKA using mobile-bearing revision components demonstrated favorable midterm clinical and radiographic results with no occurrence of bearing instability or dislocation. Longer follow-up is required to evaluate for potential advantages of mobile-bearings over fixed-bearing revision components in terms of polyethylene wear reduction, reduced stress transmission across fixation interfaces, and reduced stress on the polyethylene post. Copyright © 2017 Elsevier Inc. All rights reserved.

  16. Standard technical specifications for Babcock and Wilcox pressurized water reactors. Revision 4. Technical report

    International Nuclear Information System (INIS)

    Virgilio, M.J.

    1980-10-01

    The Standard Technical Specifications for Babcock and Wilcox Pressurized Water Reactors (BandW-STS) is a generic document prepared by the U.S. NRC for use in the licensing process. The BandW-STS provide applicants with model specifications to be used in formulation plant-specific technical specifications required by 10 CFR Part 50, Section 50.36, which set forth the specific characteristics of the facility and the conditions for its operation that are required to provide adequate protection to the health and safety of the public. This document is revised periodically to reflect current licensing requirements

  17. Spent Nuclear Fuel (SNF) Cold Vacuum Drying (CVD) Facility Operations Manual

    Energy Technology Data Exchange (ETDEWEB)

    IRWIN, J.J.

    1999-07-02

    This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-553, Spent Nuclear Fuel Project Final Safety Analysis Report Annex B--Cold Vacuum Drying Facility. The HNF-SD-SNF-DRD-002, 1999, Cold Vacuum Drying Facility Design Requirements, Rev. 4, and the CVDF Final Design Report. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence and references to the CVDF System Design Descriptions (SDDs). This manual has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved.

  18. Is Peer Review Training Effective in Iranian EFL Students' Revision?

    Science.gov (United States)

    Esmaeeli, Hadiseh; Abasi, Maasumeh; Soori, Afshin

    2014-01-01

    This study aims to investigate the effect of peer review training on the Iranian EFL students' subsequent revision in an advanced writing class in Larestan Islamic Azad University. After 12 weeks class demonstration, teacher-reviewer conferences with 20 male and female students, the students' first drafts, revisions, and reviewers' comments were…

  19. The Arundel Assumption And Revision Of Some Large-Scale Maps ...

    African Journals Online (AJOL)

    The rather common practice of stating or using the Arundel Assumption without reference to appropriate mapping standards (except mention of its use for graphical plotting) is a major cause of inaccuracies in map revision. This paper describes an investigation to ascertain the applicability of the Assumption to the revision of ...

  20. [The hybrid operating room. Home of high-end intraoperative imaging].

    Science.gov (United States)

    Gebhard, F; Riepl, C; Richter, P; Liebold, A; Gorki, H; Wirtz, R; König, R; Wilde, F; Schramm, A; Kraus, M

    2012-02-01

    A hybrid operating room must serve the medical needs of different highly specialized disciplines. It integrates interventional techniques for cardiovascular procedures and allows operations in the field of orthopaedic surgery, neurosurgery and maxillofacial surgery. The integration of all steps such as planning, documentation and the procedure itself saves time and precious resources. The best available imaging devices and user interfaces reduce the need for extensive personnel in the OR and facilitate new minimally invasive procedures. The immediate possibility of postoperative control images in CT-like quality enables the surgeon to react to problems during the same procedure without the need for later revision.