WorldWideScience

Sample records for fr30jn10p transmission planning

  1. Regional transmission subsystem planning

    Energy Technology Data Exchange (ETDEWEB)

    Costa Bortoni, Edson da [Quadrante Softwares Especializados Ltda., Itajuba, MG (Brazil); Bajay, Sergio Valdir; Barros Correia, Paulo de [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Mecanica; Santos, Afonso Henriques Moreira; Haddad, Jamil [Escola Federal de Engenharia de Itajuba, MG (Brazil)

    1994-12-31

    This work presents an approach for the planning of transmission systems by employing mixed--integer linear programming to obtain a cost and operating characteristics optimized system. The voltage loop equations are written in a modified form, so that, at the end of the analysis, the model behaves as a DC power flow, with the help of the two Kirchhoff`s laws, exempting the need of interaction with an external power flow program for analysis of the line loading. The model considers the occurrence of contingencies, so that the final result is a network robust to the most severe contingencies. This whole technique is adapted to the regional electric power transmission subsystems. (author) 9 refs., 4 figs.

  2. Transmission system planning in Ontario

    Energy Technology Data Exchange (ETDEWEB)

    Barrie, D; Macedo, F X; Mcconnach, J S [Ontario Hydro, Toronto, ON (Canada)

    1994-12-31

    In recent years, new and modified approaches to planning the large transmission system that serves the province of Ontario, Canada, have been necessary to accommodate the rapidly changing planning environment including slower uncertain growth, ageing of facilities, integration of demand side management and non utility generation options, increased competitiveness, increased financial stresses and affordable constraints. This paper describes some of the new and modified approaches and tools that have been adopted or are being developed by Ontario Hydro to cope with this changing environment. (author) 9 refs., 4 figs.

  3. Transmission planning in a deregulated environment

    DEFF Research Database (Denmark)

    Xu, Zhao

    2006-01-01

    The worldwide trend for the deregulation of the electricity generation and transmission industries has led to dramatic changes in system operation and planning procedures. The optimum approach to transmission-expansion planning in a deregulated environment is an open problem especially when the r...... electricity market grid are performed. In addition, the proposed method is compared with a traditional planning method to further verify its effectiveness....... the responsibilities of the organisations carrying out the planning work need to be addressed. To date there is a consensus that the system operator and network manager perform the expansion planning work in a centralised way. However, with an increasing input from the electricity market, the objectives, constraints...... and approaches toward transmission planning should be carefully designed to ensure system reliability as well as meeting the market requirements. A market-oriented approach for transmission planning in a deregulated environment is proposed. Case studies using the IEEE 14-bus system and the Australian national...

  4. Current issues and strategies for transmission planning

    Energy Technology Data Exchange (ETDEWEB)

    Isaacs, A.L. [Electranix, Winnipeg, MB (Canada); Rajapakse, A. [Manitoba Univ., Winnipeg, MB (Canada)

    2008-07-01

    Following the widespread deregulation of the electric power industry in the early 1990s, significant changes occurred in the regulatory and planning environments of the industry. Several regions of North America remain fully or partially regulated in the traditional sense including most Canadian provinces, except for Alberta and Ontario. Although the Mexican system has separate generation and transmission companies and current restructuring efforts are underway, all companies are state-owned, and private investment in energy is heavily constrained by the Mexican constitution. In these regulated regions, traditional generation and transmission expansion planning methods remain in use. This paper presented an overview of current trends in transmission planning strategies that have evolved in response to the restructuring of the power industry, and a conceptual framework of a procedure that would guide planners faced with the challenges of incorporating large scale wind generation in deregulated environments. The paper provided background information on the effect of deregulation on transmission planning. Planning strategies that were discussed included quantifying risk to help identify best alternatives; use of reference systems to estimate generator costs and reduce uncertainty; project based transmission expansion; transmission construction ahead of generation; and generation ahead of transmission. The impact of wind on transmission planning as well as future work addressing challenges posed by wind were also addressed. Research is continuing in this area to illustrate the concepts proposed through a detailed case study. 15 refs., 2 figs.

  5. A plan for transmission access and pricing

    International Nuclear Information System (INIS)

    Oldak, M.

    1990-01-01

    The National Rural Electric Cooperative Association (NRECA) believes that while access to the interconnected transmission system (grid) is necessary to provide the most efficient and economical development and use of the bulk power supply system, the grid cannot be unconditionally opened. Additionally, access should be provided only under reasonable terms, conditions, and cost-based compensation, within a framework of joint planning and coordinated operations. NRECA describes here its transmission policy, a coordinated planning and utilization model (CPU)

  6. Planning Electric Transmission Lines: A Review of Recent Regional Transmission Plans

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-04-13

    The first Quadrennial Energy Review (QER) recommends that the U.S. Department of Energy (DOE) conduct a national review of transmission plans and assess the barriers and incentives to their implementation. DOE tasked Lawrence Berkeley National Laboratory (LBNL) to prepare two reports to support the agency’s response to this recommendation. This report reviews regional transmission plans and regional transmission planning processes that have been directed by Federal Energy Regulatory Commission (FERC) Order Nos. 890 and 1000. We focus on the most recent regional transmission plans (those issued in 2015 and through approximately mid-year 2016) and current regional transmission planning processes. A companion report focuses on non-plan-related factors that affect transmission projects.

  7. Renewable Energy Zone (REZ) Transmission Planning Process

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Nathan [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-03-08

    A REZ is a geographical area that enables the development of profitable, cost-effective, grid-connected renewable energy (RE). The REZ Transmission Planning Process is a proactive approach to plan, approve, and build transmission infrastructure connecting REZs to the power system which helps to increase the share of solar, wind and other RE resources in the power system while maintaining reliability and economics, and focuses on large-scale wind and solar resources that can be developed in sufficient quantities to warrant transmission system expansion and upgrades.

  8. Multi-objective Transmission Planning Paper

    DEFF Research Database (Denmark)

    Xu, Zhao; Dong, Zhao Yang; Wong, Kit Po

    2009-01-01

    This paper describes a transmission expansion planning method based on multi-objective optimization (MOOP). The method starts with constructing a candidate pool of feasible expansion plans, followed by selection of the best candidates through MOOP, of which multiple objectives are tackled...

  9. Considering FACTS in Optimal Transmission Expansion Planning

    Directory of Open Access Journals (Sweden)

    K. Soleimani

    2017-10-01

    Full Text Available The expansion of power transmission systems is an important part of the expansion of power systems that requires enormous investment costs. Since the construction of new transmission lines is very expensive, it is necessary to choose the most efficient expansion plan that ensures system security with a minimal number of new lines. In this paper, the role of Flexible AC Transmission System (FACTS devices in the effective operation and expansion planning of transmission systems is examined. Effort was taken to implement a method based on sensitivity analysis to select the optimal number and location of FACTS devices, lines and other elements of the transmission system. Using this method, the transmission expansion plan for a 9 and a 39 bus power system was performed with and without the presence of FACTS with the use of DPL environment in Digsilent software 15.1. Results show that the use of these devices reduces the need for new transmission lines and minimizes the investment cost.

  10. 76 FR 49841 - Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities

    Science.gov (United States)

    2011-08-11

    ... Commission-approved RTOs and ISOs. The Commission stated that it expected all non-public utility transmission... transmission planning processes that public utility transmission providers in regions outside of RTOs and ISOs...

  11. 75 FR 14386 - Interpretation of Transmission Planning Reliability Standard

    Science.gov (United States)

    2010-03-25

    ...] Interpretation of Transmission Planning Reliability Standard March 18, 2010. AGENCY: Federal Energy Regulatory... transmission planning Reliability Standard TPL-002-0 provides that planning authorities and transmission... Reliability Standard TPL-002-0. In this order, the Commission proposes to reject NERC's proposed...

  12. Transmission investment and expansion planning in a restructured electricity market

    International Nuclear Information System (INIS)

    Wu, F.F; Wen, F.S.; Zheng, F.L.

    2006-01-01

    Transmission planning in a restructured electricity market becomes increasingly complicated. To bridge the gap between economic and engineering considerations, this survey paper suggests a framework to clarify the interactions among various economic and engineering issues by reviewing recent theoretical and practical progress in transmission investment and transmission planning methodology. Thus, the paper makes economic literature more accessible to the engineering community and engineering literature more accessible to the economic community interested in the subject. (author)

  13. Pricing and Capacity Planning Problems in Energy Transmission Networks

    DEFF Research Database (Denmark)

    Villumsen, Jonas Christoffer

    strategy. In the Nordic electricity system a market with zonal prices is adopted. We consider the problem of designing zones in an optimal way explicitly considering uncertainty. Finally, we formulate the integrated problem of pipeline capacity expansion planning and transmission pricing in natural gas...... necessitates a radical change in the way we plan and operate energy systems. Another paradigm change which began in the 1990’s for electricity systems is that of deregulation. This has led to a variety of different market structures implemented across the world. In this thesis we discuss capacity planning...... and transmission pricing problems in energy transmission networks. Although the modelling framework applies to energy networks in general, most of the applications discussed concern the transmission of electricity. A number of the problems presented involves transmission switching, which allows the operator...

  14. 2015 Plan. Project 5: transmission systems of electric power

    International Nuclear Information System (INIS)

    1992-12-01

    The planning aspects of transmission system expansion in Brazil are described, mentioning the evolution at long date of the transmission system, emphasizing the qualitative and strategic aspects. The engineering aspects and the technological development are also presented. (C.G.C.)

  15. Strategic environmental evaluation of National Transmission System Plan in Italy

    International Nuclear Information System (INIS)

    Lanadio, E.; Motawi, A.; Rizzuto, R.; Cappiello, A.; Micotti, M.

    2008-01-01

    The entry into force of part II of D. Lgs. 152/2006 establishing the procedures for strategic environmental assessment for plans and programs. The application of legislation to the development plan of the electric network of the National Transmission System verify testing conducted by Terna with ministries and authorities with environmental competences [it

  16. 77 FR 26714 - Transmission Planning Reliability Standards

    Science.gov (United States)

    2012-05-07

    ... Reliability Standards for the Bulk-Power System, Order No. 693, FERC Stats. & Regs. ] 31,242, order on reh'g... Standards for the Bulk Power System, 130 FERC ] 61,200 (2010) (March 2010 Order). \\12\\ Mandatory Reliability... excluded from future planning assessments and its potential impact to bulk electric system reliability...

  17. 78 FR 30804 - Transmission Planning Reliability Standards

    Science.gov (United States)

    2013-05-23

    ... shedding firm load versus planning to shed firm load, while still ensuring that the decision-making process... load loss. NERC states that it developed this information to ensure that an entity adequately... adverse reliability impacts. While consumers and local communities should be able to make decisions about...

  18. Composite reliability evaluation for transmission network planning

    Directory of Open Access Journals (Sweden)

    Jiashen Teh

    2018-01-01

    Full Text Available As the penetration of wind power into the power system increases, the ability to assess the reliability impact of such interaction becomes more important. The composite reliability evaluations involving wind energy provide ample opportunities for assessing the benefits of different wind farm connection points. A connection to the weak area of the transmission network will require network reinforcement for absorbing the additional wind energy. Traditionally, the reinforcements are performed by constructing new transmission corridors. However, a new state-of-art technology such as the dynamic thermal rating (DTR system, provides new reinforcement strategy and this requires new reliability assessment method. This paper demonstrates a methodology for assessing the cost and the reliability of network reinforcement strategies by considering the DTR systems when large scale wind farms are connected to the existing power network. Sequential Monte Carlo simulations were performed and all DTRs and wind speed were simulated using the auto-regressive moving average (ARMA model. Various reinforcement strategies were assessed from their cost and reliability aspects. Practical industrial standards are used as guidelines when assessing costs. Due to this, the proposed methodology in this paper is able to determine the optimal reinforcement strategies when both the cost and reliability requirements are considered.

  19. Transmission Network Expansion Planning Considering Phase-Shifter Transformers

    Directory of Open Access Journals (Sweden)

    Celso T. Miasaki

    2012-01-01

    Full Text Available This paper presents a novel mathematical model for the transmission network expansion planning problem. Main idea is to consider phase-shifter (PS transformers as a new element of the transmission system expansion together with other traditional components such as transmission lines and conventional transformers. In this way, PS are added in order to redistribute active power flows in the system and, consequently, to diminish the total investment costs due to new transmission lines. Proposed mathematical model presents the structure of a mixed-integer nonlinear programming (MINLP problem and is based on the standard DC model. In this paper, there is also applied a specialized genetic algorithm aimed at optimizing the allocation of candidate components in the network. Results obtained from computational simulations carried out with IEEE-24 bus system show an outstanding performance of the proposed methodology and model, indicating the technical viability of using these nonconventional devices during the planning process.

  20. Optimal transmission planning under the Mexican new electricity market

    International Nuclear Information System (INIS)

    Zenón, Eric; Rosellón, Juan

    2017-01-01

    This paper addresses electricity transmission planning under the new industry and institutional structure of the Mexican electricity market, which has engaged in a deep reform process after decades of a state-owned-vertically-integrated-non-competitive-closed industry. Under this new structure, characterized by a nodal pricing system and an independent system operator (ISO), we analyze welfare-optimal network expansion with two modeling strategies. In a first model, we propose the use of an incentive price-cap mechanism to promote the expansion of Mexican networks. In a second model, we study centrally-planned grid expansion in Mexico by an ISO within a power-flow model. We carry out comparisons of these models which provide us with hints to evaluate the actual transmission planning process proposed by Mexican authorities (PRODESEN). We obtain that the PRODESEN plan appears to be a convergent welfare-optimal planning process. - Highlights: • We model transmission planning (PRODESEN) in the Mexican new electricity market. • We propose a first model with a price-cap mechanism to promote network expansion. • In a second power-flow model, we study centrally-planned grid expansions. • The PRODESEN appears to be a convergent welfare-optimal planning process. • Incentive regulation could further help to implement such an optimal process.

  1. Combination of AC Transmission Expansion Planning and Reactive Power Planning in the restructured power system

    International Nuclear Information System (INIS)

    Hooshmand, Rahmat-Allah; Hemmati, Reza; Parastegari, Moein

    2012-01-01

    Highlights: ► To overcome the disadvantages of DC model in Transmission Expansion Planning, AC model should be used. ► The Transmission Expansion Planning associated with Reactive Power Planning results in fewer new transmission lines. ► Electricity market concepts should be considered in Transmission Expansion Planning problem. ► Reliability aspects should be considered in Transmission Expansion Planning problem. ► Particle Swarm Optimization is a suitable optimization method to solve Transmission Expansion Planning problem. - Abstract: Transmission Expansion Planning (TEP) is an important issue in power system studies. It involves decisions on location and number of new transmission lines. Before deregulation of the power system, the goal of TEP problem was investment cost minimization. But in the restructured power system, nodal prices, congestion management, congestion surplus and so on, have been considered too. In this paper, an AC model of TEP problem (AC-TEP) associated with Reactive Power Planning (RPP) is presented. The goals of the proposed planning problem are to minimize investment cost and maximize social benefit at the same time. In the proposed planning problem, in order to improve the reliability of the system the Expected Energy Not Supplied (EENS) index of the system is limited by a constraint. For this purpose, Monte Carlo simulation method is used to determine the EENS. Particle Swarm Optimization (PSO) method is used to solve the proposed planning problem which is a nonlinear mixed integer optimization problem. Simulation results on Garver and RTS systems verify the effectiveness of the proposed planning problem for reduction of the total investment cost, EENS index and also increasing social welfare of the system.

  2. New transmission planning methodology for requesting proposals for wind generation

    Science.gov (United States)

    Isaacs, Andrew L.

    The increasing interest in renewable energy technologies during the last decade has caused conventional transmission and generation expansion planning methodologies to be strained and in some cases abandoned. This is due both to the quantity of generator interconnection requests and the constraints imposed by deregulated energy industry structures. One technique used to control the influx of renewable generation while maintaining competitive principles is a Request for Proposals (RFP). However, lack of transmission planning due to a disconnection between generation and transmission owners, difficulty in identifying viable projects, and high risk for proponents stand as obstacles to the goals of an RFP. This research proposes a procedure which minimizes the effect of these obstacles; meeting the purchaser requirements for low price and combining conventional planning concepts with feedback from competitive structures. The general features of the method include definition of generation limits and study area, expansion plan design, transmission cost evaluation, optimal selection of requested generation levels, and final selection of successful proponents. The method is shown to be effective in creating an RFP where proponents are well-informed and provided with cost certainty to reduce bid price, buyers are able to determine end costs of their energy, and good expansion planning principles are maintained. A case study using a real system in New Mexico demonstrates these concepts.

  3. Impacts of Demand-Side Resources on Electric Transmission Planning

    Energy Technology Data Exchange (ETDEWEB)

    Hadley, Stanton W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Sanstad, Alan H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2015-01-01

    Will demand resources such as energy efficiency (EE), demand response (DR), and distributed generation (DG) have an impact on electricity transmission requirements? Five drivers for transmission expansion are discussed: interconnection, reliability, economics, replacement, and policy. With that background, we review the results of a set of transmission studies that were conducted between 2010 and 2013 by electricity regulators, industry representatives, and other stakeholders in the three physical interconnections within the United States. These broad-based studies were funded by the US Department of Energy and included scenarios of reduced load growth due to EE, DR, and DG. While the studies were independent and used different modeling tools and interconnect-specific assumptions, all provided valuable results and insights. However, some caveats exist. Demand resources were evaluated in conjunction with other factors, and limitations on transmission additions between scenarios made understanding the role of demand resources difficult. One study, the western study, included analyses over both 10- and 20-year planning horizons; the 10-year analysis did not show near-term reductions in transmission, but the 20-year indicated fewer transmission additions, yielding a 36percent capital cost reduction. In the eastern study the reductions in demand largely led to reductions in local generation capacity and an increased opportunity for low-cost and renewable generation to export to other regions. The Texas study evaluated generation changes due to demand, and is in the process of examining demand resource impacts on transmission.

  4. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    Energy Technology Data Exchange (ETDEWEB)

    Mills, Andrew D.; Wiser, Ryan; Porter, Kevin

    2009-02-02

    The rapid development of wind power that the United States has experienced over the last several years has been coupled with a growing concern that wind development will require substantial additions to the nation's transmission infrastructure. Transmission is particularly important for wind power due to the locational dependence of wind resources, the relatively low capacity factor of wind plants, and the mismatch between the short lead time to build a new wind project and the longer lead time often needed to plan, permit, and construct transmission. It is clear that institutional issues related to transmission planning, siting, and cost allocation will pose major obstacles to accelerated wind power deployment, but also of concern is the potential cost of this infrastructure build out. Simply put, how much extra cost will society bear to deliver wind power to load centers? Without an answer to this question, there can be no consensus on whether or not the cost of developing transmission for wind will be a major barrier to further wind deployment, or whether the institutional barriers to transmission expansion are likely to be of more immediate concern. In this report, we review a sample of 40 detailed transmission studies that have included wind power. These studies cover a broad geographic area, and were completed from 2001-2008. Our primary goal in reviewing these studies is to develop a better understanding of the transmission costs needed to access growing quantities of wind generation. A secondary goal is to gain a better appreciation of the differences in transmission planning approaches in order to identify those methodologies that seem most able to estimate the incremental transmission costs associated with wind development. Finally, we hope that the resulting dataset and discussion might be used to inform the assumptions, methods, and results of higher-level assessment models that are sometimes used to estimate the cost of wind deployment (e.g. NEMS

  5. Regional Transmission Planning: A review of practices following FERC Order Nos. 890 and 1000

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Gallo, Guilia [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-11-15

    Federal Energy Regulatory Commission (FERC) Order Nos. 890 and 10001 established requirements that transmission planning regions must follow in regional transmission planning and allocating the costs of new transmission facilities. Order No. 890, issued in 2007, outlined general requirements for local as well as regional transmission planning practices and procedures. Order No. 1000, issued in 2011, laid out specific requirements for: (1) regional transmission planning; (2) consideration of transmission needs driven by public policy requirements; (3) non-incumbent transmission development; (4) interregional transmission coordination; and (5) cost allocation for transmission facilities that have been selected in a regional transmission plan for purposes of cost allocation. This report reviews how these FERC orders are being implemented by the 12 transmission planning regions recognized by FERC.

  6. Multi-year expansion planning of large transmission networks

    Energy Technology Data Exchange (ETDEWEB)

    Binato, S; Oliveira, G C [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil)

    1994-12-31

    This paper describes a model for multi-year transmission network expansion to be used in long-term system planning. The network is represented by a linearized (DC) power flow and, for each year, operation costs are evaluated by a linear programming (LP) based algorithm that provides sensitivity indices for circuit reinforcements. A Backward/Forward approaches is proposed to devise an expansion plan over the study period. A case study with the southeastern Brazilian system is presented and discussed. (author) 18 refs., 5 figs., 1 tab.

  7. Combined heuristic with fuzzy system to transmission system expansion planning

    Energy Technology Data Exchange (ETDEWEB)

    Silva Sousa, Aldir; Asada, Eduardo N. [University of Sao Paulo, Sao Carlos School of Engineering, Department of Electrical Engineering Av. Trabalhador Sao-carlense, 400, 13566-590 Sao Carlos, SP (Brazil)

    2011-01-15

    A heuristic algorithm that employs fuzzy logic is proposed to the power system transmission expansion planning problem. The algorithm is based on the divide to conquer strategy, which is controlled by the fuzzy system. The algorithm provides high quality solutions with the use of fuzzy decision making, which is based on nondeterministic criteria to guide the search. The fuzzy system provides a self-adjusting mechanism that eliminates the manual adjustment of parameters to each system being solved. (author)

  8. A multi-stage stochastic transmission expansion planning method

    International Nuclear Information System (INIS)

    Akbari, Tohid; Rahimikian, Ashkan; Kazemi, Ahad

    2011-01-01

    Highlights: → We model a multi-stage stochastic transmission expansion planning problem. → We include available transfer capability (ATC) in our model. → Involving this criterion will increase the ATC between source and sink points. → Power system reliability will be increased and more money can be saved. - Abstract: This paper presents a multi-stage stochastic model for short-term transmission expansion planning considering the available transfer capability (ATC). The ATC can have a huge impact on the power market outcomes and the power system reliability. The transmission expansion planning (TEP) studies deal with many uncertainties, such as system load uncertainties that are considered in this paper. The Monte Carlo simulation method has been applied for generating different scenarios. A scenario reduction technique is used for reducing the number of scenarios. The objective is to minimize the sum of investment costs (IC) and the expected operation costs (OC). The solution technique is based on the benders decomposition algorithm. The N-1 contingency analysis is also done for the TEP problem. The proposed model is applied to the IEEE 24 bus reliability test system and the results are efficient and promising.

  9. Renewable Energy Zone (REZ) Transmission Planning Process: A Guidebook for Practitioners

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Nathan [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Flores-Espino, Francisco [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Hurlbut, David J. [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-09-05

    Achieving clean energy goals may require new investments in transmission, especially if planners anticipate economic growth and increased demand for electricity. The renewable energy zone (REZ) transmission planning process can help policymakers ensure their infrastructure investments achieve national goals in the most economical manner. Policymakers, planners, and system operators around the world have used variations of the REZ process to chart the expansion of their transmission networks and overcome the barriers of traditional transmission planning. This guidebook seeks to help power system planners, key decision makers, and stakeholders understand and use the REZ transmission planning process to integrate transmission expansion planning and renewable energy generation planning.

  10. Market-based transmission expansion planning by improved differential evolution

    International Nuclear Information System (INIS)

    Georgilakis, Pavlos S.

    2010-01-01

    The restructuring and deregulation has exposed the transmission planner to new objectives and uncertainties. As a result, new criteria and approaches are needed for transmission expansion planning (TEP) in deregulated electricity markets. This paper proposes a new market-based approach for TEP. An improved differential evolution (IDE) model is proposed for the solution of this new market-based TEP problem. The modifications of IDE in comparison to the simple differential evolution method are: (1) the scaling factor F is varied randomly within some range, (2) an auxiliary set is employed to enhance the diversity of the population, (3) the newly generated trial vector is compared with the nearest parent, and (4) the simple feasibility rule is used to treat the constraints. Results from the application of the proposed method on the IEEE 30-bus test system demonstrate the feasibility and practicality of the proposed IDE for the solution of TEP problem. (author)

  11. Transmission capacity assessment by probabilistic planning. An approach

    International Nuclear Information System (INIS)

    Lammintausta, M.

    2002-01-01

    The Finnish electricity markets participate in the Scandinavian markets, Nord-Pool. The Finnish market is free for marketers, producers and consumers. All these participants can be seen as customers of the transmission network, which in turn can be considered to be a market place in which electricity can be sold and bought. The Finnish transmission network is owned and operated by an independent company, Fingrid that has the full responsibility of the Finnish transmission system. The available transfer capacity of a transmission route is traditionally limited by deterministic security constraints. More efficient and flexible network utilisation could be achieved with probabilistic planning methods. This report introduces a simple and practical probabilistic approach for transfer limit and risk assessment. The method is based on the economical benefit and risk predictions. It uses also the existing results of deterministic data and it could be used side by side with the deterministic method. The basic concept and necessary equations for expected risks of various market players have been derived for further developments. The outage costs and thereby the risks of the market participants depend on how the system operator reacts to the faults. In the Finnish power system consumers will usually experience no costs due to the faults because of meshed network and counter trade method preferred by the system operator. The costs to the producers and dealers are also low because of the counter trade method. The network company will lose the cost of reparation, additional losses and cost of regulation power because of counter trades. In case power flows will be rearranged drastically because of aggressive strategies used in the electricity markets, the only way to fulfil the needs of free markets is that the network operator buys regulation power for short-term problems and reinforces the network in the long-term situations. The reinforcement is done if the network can not be

  12. Opportunities and Challenges of AC/DC Transmission Network Planning Considering High Proportion Renewable Energy

    Directory of Open Access Journals (Sweden)

    Arslan Habib

    2018-03-01

    Full Text Available The time and space distribution characteristics of future high proportion of renewable energy sources will bring unprecedented challenges to the electric power system’s processing and planning, the basic form of electric power system and operating characteristics will have fundamental changes. Based on the research status quo at home and abroad, this paper expounds the four scientific problems of the transmission network planning with high proportion of renewable energy. Respectively, from the network source collaborative planning, transmission network flexible planning. With the distribution network in conjunction with the transmission network planning, transmission planning program comprehensive evaluation and decision-making methods. This paper puts forward the research ideas and framework of transmission network planning considering the high proportion of renewable energy. At the end, the future high proportion of (renewable energy grid-connected transmission network’s opportunities and challenges are presented.

  13. Offshore grid transmission planning using approximated HVDC power flows

    Energy Technology Data Exchange (ETDEWEB)

    Torbaghan, Shahab Shariat; Rawn, Barry G.; Gibescu, Madeleine; Meijden, Mart van der [Delft Univ. of Technology (Netherlands). Dept. of Electrical Sustainable Energy

    2012-07-01

    In this paper we introduce an optimization framework which determines a socially optimum design of a HVDC offshore grid, under the assumption of a centralized network expansion planning scheme. This gives the optimum grid topology and interconnections capacity. In addition, the analytical solution to the optimization problem yields a market structure that expresses the relationship between the different regions' electricity prices and congestion charges associated with the interconnections. The optimization model sets the transmission capacities in a way that congestion shadow prices to be collected by the end of the economic lifetime of the project pay off the initial investment capital. We use this framework to study the impact of exercising different dispatching policies on the optimum design of the grid. The framework is applied to a multi-bus test system that functions under 8 different time periods. (orig.)

  14. Heuristic procedures for transmission planning in competitive electricity markets

    International Nuclear Information System (INIS)

    Lu, Wene; Bompard, Ettore; Napoli, Roberto; Jiang, Xiuchen

    2007-01-01

    The network structure of the power system, in an electricity market under the pool model, may have severe impacts on market performance, reducing market efficiency considerably, especially when producers bid strategically. In this context network re-enforcement plays a major role and proper strategies of transmission planning need to be devised. This paper presents, for pool-model electricity markets, two heuristic procedures to select the most effective subset of lines that would reduce the impacts on the market, from a set of predefined candidate lines and within the allowed budget for network expansion. A set of indices that account for the economic impacts of the re-enforcing of the candidate lines, both in terms of construction cost and market efficiency, are proposed and used as sensitivity indices in the heuristic procedure. The proposed methods are applied and compared with reference to an 18-bus test system. (author)

  15. Transmission investment and planning in deregulated market environment : a literature survey (part 1)

    International Nuclear Information System (INIS)

    Wen, F.; Wu, F.F.

    2005-01-01

    This paper is the first half of a 2-part paper that provided details of a comprehensive survey of issues related to transmission investment and expansion planning in the electricity market. The lack of adequate transmission capacity has played an important role in recent power crises, and deregulation has had a significant impact on the investment and planning process of transmission systems. The main objective of transmission investment is to meet load demands as cheaply as possible. In a deregulated market, there is no longer centrally coordinated planning of new generation. Transmission planning is generally not coordinated with generation planning. There is considerable uncertainty with regard to transmission capacity requirements due to long lead times for transmission construction. Generating plants and transmission lines are built according to investor assessments and private interests, and current transmission systems were not designed to handle supply and demand patterns in competitive markets. It was recommended that new transmission plans should meet reliability requirements while minimizing expected unserved energy. It was concluded that reliability criteria must be redefined to account for the fact that transmission systems are more stressed under deregulation. Two popular financial transmission rights were also discussed, notably (1) point-to-point financial transmission rights (FTR); and (2) financial flowgate rights (FGR)

  16. 77 FR 64890 - Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities

    Science.gov (United States)

    2012-10-24

    ... regional transmission organizations (RTOs) are required to follow regarding the availability of long-term.... P 649. \\51\\ Id. P 746. \\52\\ As Transmission Access Policy Study Group also recognizes, not all RTOs...

  17. 75 FR 37883 - Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities

    Science.gov (United States)

    2010-06-30

    ... transmission providers, including Commission-approved regional transmission organizations (RTOs) and... granted extensions. 12. As a result of these compliance filings, RTOs and ISOs have enhanced their... outside of RTOs and ISOs have relied on to comply with certain requirements of Order No. 890 are the North...

  18. Incorporating energy efficiency into electric power transmission planning: A western United States case study

    International Nuclear Information System (INIS)

    Barbose, Galen L.; Sanstad, Alan H.; Goldman, Charles A.

    2014-01-01

    Driven by system reliability goals and the need to integrate significantly increased renewable power generation, long-range, bulk-power transmission planning processes in the United States are undergoing major changes. At the same time, energy efficiency is an increasing share of the electricity resource mix in many regions, and has become a centerpiece of many utility resource plans and state policies as a means of meeting electricity demand, complementing supply-side sources, and reducing carbon dioxide emissions from the electric power system. The paper describes an innovative project in the western United States to explicitly incorporate end-use efficiency into load forecasts – projections of electricity consumption and demand – that are a critical input into transmission planning and transmission planning studies. Institutional and regulatory background and context are reviewed, along with a detailed discussion of data sources and analytical procedures used to integrate efficiency into load forecasts. The analysis is intended as a practical example to illustrate the kinds of technical and institutional issues that must be addressed in order to incorporate energy efficiency into regional transmission planning activities. - Highlights: • Incorporating energy efficiency into electric power transmission planning is an emergent analytical and policy priority. • A new methodology for this purpose was developed and applied in the western U.S. transmission system. • Efficiency scenarios were created and incorporated into multiple load forecasts. • Aggressive deployment of efficiency policies and programs can significantly reduce projected load. • The approach is broadly applicable in long-range transmission planning

  19. Technical and economic evaluation of voltage level in transmission network expansion planning using GA

    International Nuclear Information System (INIS)

    Jalilzadeh, S.; Kazemi, A.; Shayeghi, H.; Madavi, M.

    2008-01-01

    Transmission network expansion planning is an important part of power system planning. Its task is to determine an optimal network configuration according to load growth. It determines where, when and how many new transmission lines should be installed. Up to now, various methods have been presented to solve the static transmission network expansion planning (STNEP) problem, but in all of these methods, the STNEP problem has been solved regardless of voltage level of the lines. In this paper, due to different voltage levels in the transmission network, which cause different annual losses, STNEP has been studied considering the voltage level of the transmission lines and the network loss using the genetic algorithm (GA). Finally, the proposed idea has been examined on Garvers 6 bus network. The results show that considering the loss in a network with different voltage levels decreases the operational costs considerably, and the network satisfies the requirement of delivering electric power more safely and reliably to load centers

  20. The Role of Demand Resources In Regional Transmission Expansion Planning and Reliable Operations

    Energy Technology Data Exchange (ETDEWEB)

    Kirby, Brendan J [ORNL

    2006-07-01

    Investigating the role of demand resources in regional transmission planning has provided mixed results. On one hand there are only a few projects where demand response has been used as an explicit alternative to transmission enhancement. On the other hand there is a fair amount of demand response in the form of energy efficiency, peak reduction, emergency load shedding, and (recently) demand providing ancillary services. All of this demand response reduces the need for transmission enhancements. Demand response capability is typically (but not always) factored into transmission planning as a reduction in the load which must be served. In that sense demand response is utilized as an alternative to transmission expansion. Much more demand response is used (involuntarily) as load shedding under extreme conditions to prevent cascading blackouts. The amount of additional transmission and generation that would be required to provide the current level of reliability if load shedding were not available is difficult to imagine and would be impractical to build. In a very real sense demand response solutions are equitably treated in every region - when proposed, demand response projects are evaluated against existing reliability and economic criteria. The regional councils, RTOs, and ISOs identify needs. Others propose transmission, generation, or responsive load based solutions. Few demand response projects get included in transmission enhancement plans because few are proposed. But this is only part of the story. Several factors are responsible for the current very low use of demand response as a transmission enhancement alternative. First, while the generation, transmission, and load business sectors each deal with essentially the same amount of electric power, generation and transmission companies are explicitly in the electric power business but electricity is not the primary business focus of most loads. This changes the institutional focus of each sector. Second

  1. A Multi-objective Model for Transmission Planning Under Uncertainties

    DEFF Research Database (Denmark)

    Zhang, Chunyu; Wang, Qi; Ding, Yi

    2014-01-01

    The significant growth of distributed energy resources (DERs) associated with smart grid technologies has prompted excessive uncertainties in the transmission system. The most representative is the novel notation of commercial aggregator who has lighted a bright way for DERs to participate power...

  2. Transmission investment and planning in deregulated market environment : a literature survey (part 2)

    International Nuclear Information System (INIS)

    Wen, F.; Wu, F.F.

    2005-01-01

    This paper is the second half of a 2-part paper that provided details of a comprehensive survey of issues related to transmission investment and expansion planning in the electricity market. Results of the survey suggested that transmission regulation is needed to provide a fair playing field for competition and to ensure that transmission networks are optimally expanded while also meeting reliability constraints. Regulations will create further incentives for cost reduction while ensuring that regulated firms have assurance of cost recovery. Transmission planning should be controlled or monitored by a government organization or regulator. Legislation is needed to ensure that regulatory authorities can enforce reliability criteria. Mandatory reliability standards and metrics for reliability services should be implemented. The economic benefits of transmission expansion in a deregulated market should be modelled using non-deterministic approaches. It was concluded that transmission expansion plans should be able to meet future transmission capacity requirements, secure returns on investment, and ensure reliability levels for customers. Various international transmission expansion plans were also provided. 38 refs

  3. 75 FR 62023 - Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities

    Science.gov (United States)

    2010-10-07

    ... transmission needs driven by public policy requirements established by state or federal laws or regulations... facilities; and remove from Commission-approved tariffs or agreements a right of first refusal created by..., as a result of a Commission- approved tariff or agreement, receive different treatment in a regional...

  4. A hybrid Planning Method for Transmission Network in a Deregulated Enviroment

    DEFF Research Database (Denmark)

    Xu, Zhao; Dong, Zhaoyang; Poulsen, Kit

    2006-01-01

    The reconstruction of power industries has brought fundamental changes to both power system operation and planning. This paper presents a new planning method using a multi-objective optimization (MOOP) technique, as well as human knowledge, to expand the transmission network in open-access scheme...

  5. A multi-objective framework for dynamic transmission expansion planning in competitive electricity market

    International Nuclear Information System (INIS)

    Foroud, Asghar Akbari; Abdoos, Ali Akbar; Keypour, Reza; Amirahmadi, Meisam

    2010-01-01

    Restructuring of power system has changed the traditional planning objectives and introduced challenges in the field of Transmission Expansion Planning (TEP). Due to these changes, new approaches and criteria are needed for transmission planning in deregulated environment. Therefore, in this paper, a dynamic expansion methodology is presented using a multi-objective optimization framework. Investment cost, congestion cost and reliability are considered in the optimization as three objectives. To overcome the difficulties in solving the non-convex and mixed integer nature of the optimization problems, a Non-Dominated Sorting Genetic Algorithm (NSGA II) approach is used followed by a fuzzy decision making analysis to obtain the final optimal solution. The planning methodology has been demonstrated on the IEEE 24-bus test system and north-east of Iran national 400 kV transmission grid to show the feasibility and capabilities of the proposed algorithm in electricity market environment. (author)

  6. Grid Transmission Expansion Planning Model Based on Grid Vulnerability

    Science.gov (United States)

    Tang, Quan; Wang, Xi; Li, Ting; Zhang, Quanming; Zhang, Hongli; Li, Huaqiang

    2018-03-01

    Based on grid vulnerability and uniformity theory, proposed global network structure and state vulnerability factor model used to measure different grid models. established a multi-objective power grid planning model which considering the global power network vulnerability, economy and grid security constraint. Using improved chaos crossover and mutation genetic algorithm to optimize the optimal plan. For the problem of multi-objective optimization, dimension is not uniform, the weight is not easy given. Using principal component analysis (PCA) method to comprehensive assessment of the population every generation, make the results more objective and credible assessment. the feasibility and effectiveness of the proposed model are validated by simulation results of Garver-6 bus system and Garver-18 bus.

  7. Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-04-01

    The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.

  8. Solar data inputs for integration and transmission planning studies

    Energy Technology Data Exchange (ETDEWEB)

    Orwig, Kirsten D.; Hummon, Marissa; Hodge, Bri-Mathias; Lew, Debra [National Renewable Energy Laboratory, Golden, CO (United States)

    2011-07-01

    Renewable energy integration studies are frequently conducted to evaluate the impacts wind and solar power have on grid operations and planning. In the United States, these studies have historically been focused on wind energy integration. However, with the rapid deployment of large-scale and distributed solar power across the United States, and Hawaii, the interest in solar power variability and its impacts on the grid is increasing. To complete detailed integration studies, modeled power production of existing and future solar power deployments is necessary. This paper discusses some of the methods used to generate photovoltaic (PV) and concentrating solar power (CSP) production profiles for studies undertaken in the United States, evaluates the results, and compares the profiles with measured solar power production characteristics. (orig.)

  9. Improved cost–benefit analysis for market-based transmission planning, a European perspective

    International Nuclear Information System (INIS)

    Papaemmanouil, A.; Bertling Tjernberg, L.; Tuan, L.A.; Andersson, G.

    2013-01-01

    This paper addresses the problem of transmission planning in interconnected power systems under the uncertainty of future generation parks and fast varying marginal production costs. The decision maker has to consider many different aspects during the definition of different transmission planning strategies that sometimes might even be contradicting. Major contributions are the incorporation of energy policy measurements in the evaluation process of candidate transmission plans and the inclusion of short- and long-term uncertainties. The proposed methodology, so-called C-TRAP, is based on a semi-dynamic heuristic approach that solves the social welfare maximization problem for several discrete steps considering different preferences for energy policy and transmission network reinforcements. The flexibility provided through the heuristic analysis is very important for decision makers in the new uncertain environment in power systems. - Highlights: • Consideration of environmental policy in the decision of transmission expansion plans. • Semi-dynamic heuristic approach including societal, economic and availability standards. • Market-based approach using nodal pricing. • The amount of reduced unserved load is not equal to the amount of capacity increase of a line. • Less environmental costs lead usually to higher congestion costs due to overly power trading

  10. Studying influence of two effective parameters on network losses in transmission expansion planning using DCGA

    International Nuclear Information System (INIS)

    Shayeghi, H.; Jalilzadeh, S.; Mahdavi, M.; Hadadian, H.

    2008-01-01

    Transmission network expansion planning (TNEP) is a basic part of power network planning that determines where, when and how many new transmission lines should be added to the network. Its task is to minimize the network construction and operational cost, while meeting imposed technical, economic and reliability constraints. Up till now, various methods have been proposed for solution of the static transmission network expansion planning (STNEP) problem. But, in all of them, the effect of two important parameters i.e., inflation rate and load growth factor on network losses has not been investigated. Thus, in this paper, STNEP is being studied considering the effect of inflation rate and load growth factor on the network losses in a transmission network with different voltage levels using a decimal codification genetic algorithm (DCGA). The effectiveness of the proposed idea is tested on the Garver's six-bus network. The results evaluation reveals that the inflation rate and load growth factor have important effect on the network losses and subsequent network arrangement. In addition, considering the effect of two above-mentioned parameters (inflation rate and load growth factor) in expansion planning of transmission networks with various line voltage levels is caused that the total expansion cost of the network (expansion costs and the operational cost) is calculated more exactly and therefore the network satisfies the requirements of delivering electric power more safely and reliably to load centers

  11. Environmental impacts of power plants and transmission lines in power system planning

    International Nuclear Information System (INIS)

    Miracapillo, C.; Moreschini, G.; Rome Univ. 'La Sapienza'

    1992-01-01

    This paper deals with a criterion to assess the environmental impacts of power plants and transmission lines in power system planning. First, the effects of hydro-plants, thermal plants and transmission lines are reviewed. Then, a number of methods for the evaluation of the environmental impacts of civil and industrial plants are described. A new criterion is proposed to introduce the evaluation of the environmental impact and related costs into methods for power system planning. Finally, the criterion is applied to a simple case

  12. Transmission solutions : a 10 year plan for the province of Ontario 2005-2014

    International Nuclear Information System (INIS)

    2005-02-01

    This paper present a 10 year transmission plan for Ontario by Hydro One Networks Inc., the largest electricity delivery company in the province. A history of Hydro One Network's activities during the past century was provided as well as information about the company and details of their mission and objectives. A list of their accomplishments during 2004 was also presented. An outline of the current transmission infrastructure system was presented. Elements of the plan include customer connections; area supply reliability; facilitation of electricity supply; and transmission needs and solutions. Plans specific to central, western, eastern and northeastern zones were also presented, including zone maps of transmission lines and generating stations. Changes included: Bill 100, the Electricity Restructuring Act in 2004 and the establishment of the Ontario Power Authority (OPA); changes to the Ontario Energy Board's Transmission System Code (TSC); government measures to increase the supply of electricity through requests for proposals (RFPs) for new renewable and clean energy; and the announcement of an increase in the amount of wind energy through the Wind Power Production Incentive program. refs., tabs., figs

  13. Optimal Capacity Proportion and Distribution Planning of Wind, Photovoltaic and Hydro Power in Bundled Transmission System

    Science.gov (United States)

    Ye, X.; Tang, Q.; Li, T.; Wang, Y. L.; Zhang, X.; Ye, S. Y.

    2017-05-01

    The wind, photovoltaic and hydro power bundled transmission system attends to become common in Northwest and Southwest of China. To make better use of the power complementary characteristic of different power sources, the installed capacity proportion of wind, photovoltaic and hydro power, and their capacity distribution for each integration node is a significant issue to be solved in power system planning stage. An optimal capacity proportion and capacity distribution model for wind, photovoltaic and hydro power bundled transmission system is proposed here, which considers the power out characteristic of power resources with different type and in different area based on real operation data. The transmission capacity limit of power grid is also considered in this paper. Simulation cases are tested referring to one real regional system in Southwest China for planning level year 2020. The results verify the effectiveness of the model in this paper.

  14. Considerations on smart grid developments and impacts on transmission operation and planning

    NARCIS (Netherlands)

    Ribeiro, P.F.; Nguyen, P.H.; Kling, W.L.

    2012-01-01

    This paper discusses some historical and technical events, particularly in USA and Europe, over the last few years, that are aimed at modernizing the electric power grid. The paper also looks at possible impacts on transmission operation and planning as the system moves from a centralized to a

  15. A computational model for determining the minimal cost expansion alternatives in transmission systems planning

    International Nuclear Information System (INIS)

    Pinto, L.M.V.G.; Pereira, M.V.F.; Nunes, A.

    1989-01-01

    A computational model for determining an economical transmission expansion plan, based in the decomposition techniques is presented. The algorithm was used in the Brazilian South System and was able to find an optimal solution, with a low computational resource. Some expansions of this methodology are been investigated: the probabilistic one and the expansion with financier restriction. (C.G.C.). 4 refs, 7 figs

  16. 76 FR 49764 - Notice of FERC Staff Attendance at the Entergy ICT Transmission Planning Summit and Entegry...

    Science.gov (United States)

    2011-08-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Entergy ICT Transmission Planning Summit and Entegry Regional State Committee Meeting The Federal Energy.... Their attendance is part of the Commission's ongoing outreach efforts. Entergy ICT Transmission Planning...

  17. Energy-water analysis of the 10-year WECC transmission planning study cases.

    Energy Technology Data Exchange (ETDEWEB)

    Tidwell, Vincent Carroll; Passell, Howard David; Castillo, Cesar; Moreland, Barbara

    2011-11-01

    In 2011 the Department of Energy's Office of Electricity embarked on a comprehensive program to assist our Nation's three primary electric interconnections with long term transmission planning. Given the growing concern over water resources in the western U.S. the Western Electricity Coordinating Council (WECC) requested assistance with integrating water resource considerations into their broader electric transmission planning. The result is a project with three overarching objectives: (1) Develop an integrated Energy-Water Decision Support System (DSS) that will enable planners in the Western Interconnection to analyze the potential implications of water stress for transmission and resource planning. (2) Pursue the formulation and development of the Energy-Water DSS through a strongly collaborative process between the Western Electricity Coordinating Council (WECC), Western Governors Association (WGA), the Western States Water Council (WSWC) and their associated stakeholder teams. (3) Exercise the Energy-Water DSS to investigate water stress implications of the transmission planning scenarios put forward by WECC, WGA, and WSWC. The foundation for the Energy-Water DSS is Sandia National Laboratories Energy-Power-Water Simulation (EPWSim) model (Tidwell et al. 2009). The modeling framework targets the shared needs of energy and water producers, resource managers, regulators, and decision makers at the federal, state and local levels. This framework provides an interactive environment to explore trade-offs, and 'best' alternatives among a broad list of energy/water options and objectives. The decision support framework is formulated in a modular architecture, facilitating tailored analyses over different geographical regions and scales (e.g., state, county, watershed, interconnection). An interactive interface allows direct control of the model and access to real-time results displayed as charts, graphs and maps. The framework currently supports

  18. Integrated multiperiod power generation and transmission expansion planning with sustainability aspects in a stochastic environment

    International Nuclear Information System (INIS)

    Seddighi, Amir Hossein; Ahmadi-Javid, Amir

    2015-01-01

    This paper presents a multistage stochastic programming model to address sustainable power generation and transmission expansion planning. The model incorporates uncertainties about future electricity demand, fuel prices, greenhouse gas emissions, as well as possible disruptions to which the power system is subject. A number of sustainability regulations and policies are considered to establish a framework for the social responsibility of the power system. The proposed model is applied to a real-world case, and several sensitivity analyses are carried out to provide managerial insights into different aspects of the model. The results emphasize the important role played by sustainability policies on the configuration of the power grid. - Highlights: • This paper considers integrated power generation and transmission expansion planning. • Sustainability aspects are incorporated into a multiperiod stochastic setting. • A stochastic mathematical programming model is developed to address the problem. • The model is applied to a real-world case and numerical studies are carried out

  19. Transmission network expansion planning based on hybridization model of neural networks and harmony search algorithm

    Directory of Open Access Journals (Sweden)

    Mohammad Taghi Ameli

    2012-01-01

    Full Text Available Transmission Network Expansion Planning (TNEP is a basic part of power network planning that determines where, when and how many new transmission lines should be added to the network. So, the TNEP is an optimization problem in which the expansion purposes are optimized. Artificial Intelligence (AI tools such as Genetic Algorithm (GA, Simulated Annealing (SA, Tabu Search (TS and Artificial Neural Networks (ANNs are methods used for solving the TNEP problem. Today, by using the hybridization models of AI tools, we can solve the TNEP problem for large-scale systems, which shows the effectiveness of utilizing such models. In this paper, a new approach to the hybridization model of Probabilistic Neural Networks (PNNs and Harmony Search Algorithm (HSA was used to solve the TNEP problem. Finally, by considering the uncertain role of the load based on a scenario technique, this proposed model was tested on the Garver’s 6-bus network.

  20. The insertion of environmental impact assessment in the planning process of electrical energy transmission systems

    International Nuclear Information System (INIS)

    Pires, S.H.

    1994-03-01

    The main objective of this work is to identify and propose adequate methodologies in each stage of the planning process of electrical energy transmission systems. The aim is to incorporate the environmental dimension as a variable of this process, along with the economic and technical aspects. All these factors are to be taken into consideration in the decision-making, design and management of these projects. The environmental impact assessment (EIA) concepts, methods and procedures were analysed, as well as the roles that it should play, as a means to become the effective instrument of the Environmental Policy. In this study we analysed the whole planning process of the implementation of transmission lines and their impact on the environment. The current attitudes about this subject were investigated and scrutinized. Critical evaluations were made to suggest an orientation in the formulation of the proposed methodology. (author). 125 refs, 11 figs, 13 tabs

  1. SELF: expert system for supporting verification of network operating constraints in power transmission planning

    Energy Technology Data Exchange (ETDEWEB)

    Cicoria, R; Migliardi, P [Ente Nazionale per l` Energia Elettrica, Milan (Italy); Pogliano, P [Centro Informazioni Studi Esperienze (CISE), Milan (Italy)

    1995-06-01

    Performing planned studies into very large HV transmission systems is a very complex task which requires the use of simulation models and the application of the heuristic acquired by expert palnners during previous studies. The ENEL Electric Research Center and the CISE Artificial Intelligence Section have developed a knowledge-based system, named SELF, which is aimed at supporting the transmission system palnner. SELF is capable of assisting the engineer both in finding the convergence of the load flow calculation and determining solutions that respect active power, voltage and VAR operating constraints. This paper describes the overall architecture of the system and shows its integration in a larger planning environment called SPIRA, currently utilized at ENEL. More details are given on the least completed modules, the redispatching and network reinforcement subsystems which deal with active power constraint verification.

  2. Coupling and corona effects research plan for transmission lines. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Bridges, J E; Formanek, V C

    1976-06-01

    Concern has arisen over the possible effects of electric and magnetic fields produced by EHV-UHV transmission lines. Past and ongoing research concerning the electric and magnetic field effects from EHV-UHV transmission lines was reviewed as it pertains to the following areas: (1) electromagnetic interference, (2) acoustic noise, (3) generation of gaseous effluents, and (4) safety considerations of induced voltages and currents. The intent of this review was to identify the short and long range research projects required to address these areas. The research plan identifies and gives priority to twenty programs in corona and coupling effects. In the case of the corona effects, a number of programs were recommended for acoustic noise and electromagnetic interference to delineate improved power line design criteria in terms of social, meteorological, geographical and cost constraints. Only one project is recommended in the case of ozone generation, because the results of comprehensive analyses, laboratory studies and field measurements have demonstrated that power lines do not contribute significant quantities of ozone. In the case of the coupling effects, a number of programs are recommended for HVAC transmission lines to improve the theoretically developed design guidelines by considering practical constraints. For HVDC transmission lines, programs are suggested to engender a better theoretical understanding and practical measurements capability for the coupling mechanisms of the dc electric and magnetic field with nearby objects. The interrelationship of the programs and their role in a long-term research plan is also discussed.

  3. AC transmission network expansion planning considering circuits repowering and location of capacitors

    OpenAIRE

    Jaime A. López-López; Diego A. Tejada-Arango; Jesús M. López-Lezama

    2016-01-01

    This paper deals with the Transmission Network Expansion Planning (TNEP) problem. The TNEP consists of finding a set of new circuits on a power system, which is needed to attend a future demand. In its classical version, the TNEP only considers as solution candidates the addition of new lines and transformers. The main contribution of this paper consists in the inclusion of nonconventional solution candidates, namely the repowering of existing circuits and the location of capacitor banks. To ...

  4. Decennial development plan of the GRTgaz's transmission network 2012-2021

    International Nuclear Information System (INIS)

    2012-09-01

    The GRTgaz network is the longest high pressure natural gas transmission network in Europe, and one of the best interconnected. It comprises a main network and a regional network. After an indication of some key figures of the GRTgaz network (duct length, transported volume, exchanged power, clients, turnover, investments), this report proposes a synthetic overview of the decennial development plan framework, of European and French energy policies, of the French geographical position in relationship with Europe, and of the energetic objectives of the decennial plan. In its other parts, this report reviews the gas transmission demand and supply, analyses the evolution of the gas market in Europe and in France (consumption and supplies, issue of secure supply), describes the development of the GRTgaz transmission network (developments in the northern and southern areas, merger of North and South market areas, connection of Corsica), presents the provisional timetable for the planned works (projects put into service within 3 years or after 2014, provisional development of capacities during the 2012-2021 period)

  5. A Vision of China-Arab Interconnection Transmission Network Planning with UHVDC Technology

    Science.gov (United States)

    Wu, Dan; Liu, Yujun; Yin, Hongyuan; Xu, Qingshan; Xu, Xiaohui; Ding, Maosheng

    2017-05-01

    Developments in ultra-high-voltage (UHV) power systems and clean energy technologies are paving the way towards unprecedented energy market globalization. In accordance with the international community’s enthusiasm for building up the Global Energy Internet, this paper focuses on the feasibility of transmitting large-size electricity from northwest China to Arab world through a long-distance transnational power interconnection. The complete investigations on the grids of both the sending-end and receiving-end is firstly presented. Then system configuration of the transmission scheme and corridor route planning is proposed with UHVDC technology. Based on transmission costs’ investigation about similar transmission projects worldwide, the costs of the proposed transmission scheme are estimated through adjustment factors which represent differences in latitude, topography and economy. The proposed China-Arab transmission line sheds light on the prospects of power cooperation and resource sharing between China and Arab states, and appeals for more emphasis on green energy concentrated power interconnections from a global perspective.

  6. An optimization framework for the integrated planning of generation and transmission expansion in interconnected power systems

    International Nuclear Information System (INIS)

    Guerra, Omar J.; Tejada, Diego A.; Reklaitis, Gintaras V.

    2016-01-01

    Highlights: • A novel optimization framework for the design and planning of interconnected power systems is proposed. • The framework integrates generation and transmission capacity expansion planning. • Reserve and emission constraints are included. • Business as usual and CO_2 mitigation policy scenarios are evaluated. • Reconfiguration of existing power generation technologies is the most cost-effective option for CO_2 emissions mitigation. - Abstract: Energy, and particularly electricity, has played and will continue to play a very important role in the development of human society. Electricity, which is the most flexible and manageable energy form, is currently used in a variety of activities and applications. For instance, electricity is used for heating, cooling, lighting, and for operating electronic appliances and electric vehicles. Nowadays, given the rapid development and commercialization of technologies and devices that rely on electricity, electricity demand is increasing faster than overall primary energy supply. Consequently, the design and planning of power systems is becoming a progressively more important issue in order to provide affordable, reliable and sustainable energy in timely fashion, not only in developed countries but particularly in developing economies where electricity demand is increasing even faster. Power systems are networks of electrical devices, such as power plants, transformers, and transmission lines, used to produce, transmit, and supply electricity. The design and planning of such systems require the selection of generation technologies, along with the capacity, location, and timing of generation and transmission capacity expansions to meet electricity demand over a long-term horizon. This manuscript presents a comprehensive optimization framework for the design and planning of interconnected power systems, including the integration of generation and transmission capacity expansion planning. The proposed

  7. Planning for pre-exposure prophylaxis to prevent HIV transmission: challenges and opportunities

    Science.gov (United States)

    2010-01-01

    There are currently several ongoing or planned trials evaluating the efficacy of pre-exposure prophylaxis (PrEP) as a preventative approach to reducing the transmission of HIV. PrEP may prove ineffective, demonstrate partial efficacy, or show high efficacy and have the potential to reduce HIV infection in a significant way. However, in addition to the trial results, it is important that issues related to delivery, implementation and further research are also discussed. As a part of the ongoing discussion, in June 2009, the Bill & Melinda Gates Foundation sponsored a Planning for PrEP conference with stakeholders to review expected trial results, outline responsible educational approaches, and develop potential delivery and implementation strategies. The conference reinforced the need for continued and sustained dialogue to identify where PrEP implementation may fit best within an integrated HIV prevention package. This paper identifies the key action points that emerged from the Planning for PrEP meeting. PMID:20624303

  8. ENTSOE Role in Transmission Network Planning Following the Provisons of the EU's Third Energy Package

    International Nuclear Information System (INIS)

    Medjimorec, D.

    2011-01-01

    In the initial period of its operation the European network of transmission system operators for electricity (ENTSO-E) has prepared and published the first edition of its ten-year network development plan (TYNDP) for period 2010-2020, by which has fulfilled one of the ENTSO-E's tasks according to the new Directive 714/09/EZ on grid accessing conditions for cross-border electricity exchange. In this process, ENTSO-E has carried out a broad public debates, which provided, together with general reactions of a number of major European power industry stakeholders, expectations regarding new editions of this non-binding paper (TYNDP), which followed every two years. Following these experiences, and the experiences of individual transmission system operators as participants of making TYNDP ''pilot'' through ENTSO-E, a plan and a time schedule of activities were adopted until the publication of the next TYNDP in the spring of 2012. Important step in this represents parallel preparation and creation of six regional investment plans (RIP) in order to reduce the scope of activities at the pan-European TYNDP level and to ensure their consistency. Namely among this six regions agreed between transmission system operators, which are members of ENTSO-E, there are certain overlaps in the area which they include (and thus in included projects). One of the three main reasons for launching investment projects in new or reconstructed transmission facilities which are covered with TYNDP or RIP is the integration of electricity market. Therefore is, within the methodology improvement of making TYNDP or RIP, further expanded treatment of input data, especially in terms of market-relevant data and data needed for modeling electricity market and its impact on investment in the transmission system. Also, additional scenarios that are used by all RIP are defined, where the most important scenario is so called 20-20-20 which as the basic input parameters takes National investment plans whose

  9. Ten-year development plan for the GRTgaz transmission network 2015-2024 period

    International Nuclear Information System (INIS)

    2015-11-01

    GRTgaz is a European leader in natural gas transmission, a world expert in gas transmission networks and systems, and an operator firmly committed to the energy transition. It owns and operates the gas transmission network throughout most of France and it manages the transmission network in Germany, thereby helping to ensure correct operation of the French and European gas market. It contributes to the energy security of regional supply systems and performs a public service mission to ensure the continuity of consumer supply. In accordance with the French Energy Code, GRTgaz publishes a 10-year development plan for its gas distribution network in France every year. This document is produced in line with European and French energy policies. It identifies the transport infrastructure that will need to be built over the next three years, and presents the main infrastructure that is likely to be developed within the next ten years. It incorporates the supply security obligations that TSOs are required to fulfil. It takes account of interested parties' needs and projects at the national, supranational and European levels. It is based on existing gas supply and demand and reasonable medium-term development forecasts for gas infrastructure, consumption and international trade

  10. Ten-year development plan for the GRTgaz transmission network 2016-2025 period

    International Nuclear Information System (INIS)

    2016-11-01

    GRTgaz is a European leader in natural gas transmission, a world expert in gas transmission networks and systems, and an operator firmly committed to the energy transition. It owns and operates the gas transmission network throughout most of France and it manages the transmission network in Germany, thereby helping to ensure correct operation of the French and European gas market. It contributes to the energy security of regional supply systems and performs a public service mission to ensure the continuity of consumer supply. In accordance with the French Energy Code, GRTgaz publishes a 10-year development plan for its gas distribution network in France every year. This document is produced in line with European and French energy policies. It identifies the transport infrastructure that will need to be built over the next three years, and presents the main infrastructure that is likely to be developed within the next ten years. It incorporates the supply security obligations that TSOs are required to fulfil. It takes account of interested parties' needs and projects at the national, supranational and European levels. It is based on existing gas supply and demand and reasonable medium-term development forecasts for gas infrastructure, consumption and international trade

  11. Ten-Year Development Plan for the GRTgaz Transmission Network 2011-2020 Period

    International Nuclear Information System (INIS)

    2011-10-01

    GRTgaz is a European leader in natural gas transmission, a world expert in gas transmission networks and systems, and an operator firmly committed to the energy transition. It owns and operates the gas transmission network throughout most of France and it manages the transmission network in Germany, thereby helping to ensure correct operation of the French and European gas market. It contributes to the energy security of regional supply systems and performs a public service mission to ensure the continuity of consumer supply. In accordance with the French Energy Code, GRTgaz publishes a 10-year development plan for its gas distribution network in France every year. This document is produced in line with European and French energy policies. It identifies the transport infrastructure that will need to be built over the next three years, and presents the main infrastructure that is likely to be developed within the next ten years. It incorporates the supply security obligations that TSOs are required to fulfil. It takes account of interested parties' needs and projects at the national, supranational and European levels. It is based on existing gas supply and demand and reasonable medium-term development forecasts for gas infrastructure, consumption and international trade

  12. Interregional power transmission: a component in planning for renewable energy technologies

    International Nuclear Information System (INIS)

    Krueger Nielsen, S.; Soerensen, B.

    2000-01-01

    We discuss the role played by interregional power transmission on the basis of recent scenario work. In a project dealing with long-term planning for energy efficiency and renewable energy in Europe we modelled a scenario for the present 15 EU countries' energy system in 2050. The basis for the scenario is the concept of 'fair pricing' for energy services, meaning that the price of energy should reflect all externalities, but not otherwise be taxed or subsidized. The project assessed resource availability and expected technology price developments over time for a number of energy-related technologies, both on the supply side, the intermediate conversion chain and on the demand side. Among these, transmission technologies play an important role, both in smoothing out renewable energy supplies within the European Union region, and also allowing substantial import of energy from countries outside the EU having a surplus of renewable energy based power. (orig.)

  13. MILP Approach for Bilevel Transmission and Reactive Power Planning Considering Wind Curtailment

    DEFF Research Database (Denmark)

    Ugranli, Faruk; Karatepe, Engin; Nielsen, Arne Hejde

    2017-01-01

    In this study, two important planning problems in power systems that are transmission expansion and reactive power are formulated as a mixed-integer linear programming taking into account the bilevel structure due to the consideration of market clearing under several load-wind scenarios....... The objective of the proposed method is to minimize the installation cost of transmission lines, reactive power sources, and the annual operation costs of conventional generators corresponding to the curtailed wind energy while maintaining the reliable system operation. Lower level problems of the bilevel...... structure are designated for the market clearing which is formulated by using the linearized optimal power flow equations. In order to obtain mixed-integer linear programming formulation, the so-called lower level problems are represented by using primal-dual formulation. By using the proposed method, power...

  14. California Energy Commission Public Interest EnergyResearch/Energy System Integration -- Transmission-Planning Research&Development Scoping Project

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

    2004-07-01

    The objective of this Public Interest Energy Research (PIER)scoping project is to identify options for public-interest research and development (R&D) to improve transmission-planning tools, techniques, and methods. The information presented was gathered through a review of current California utility, California Independent System Operator (ISO), and related western states electricity transmission-planning activities and emerging needs. This report presents the project teams findings organized under six topic areas and identifies 17 distinct R&D activities to improve transmission-planning in California and the West. The findings in this report are intended for use, along with other materials, by PIER staff, to facilitate discussions with stakeholders that will ultimately lead to development of a portfolio of transmission-planning R&D activities for the PIER program.

  15. The planning of transmission grids. Conditions of the energy policy turnaround; Die Planung der Uebertragungsnetze. Bedingung der Energiewende.

    Energy Technology Data Exchange (ETDEWEB)

    Witt, Siegfried de; Durinke, Peter; Kause, Harriet [DE WITT Rechtsanwaltsgesellschaft mbH, Berlin (Germany)

    2012-07-01

    The book reports on planning processes for the power transmission grid. The design and implementation of a high-voltage line of the transmission system consists of four stages (Part I): (a) National planning of requirements; (b) Planning procedures or federal sector planning; (c) Planning approval procedure; (d) Expropriation proceedings. Part II of this book describes the planning according to the Energy Economy Law (EnWG) and Electricity Grid Expansion Act (EnLAG). The Part III of the book under consideration describes the procedures to be taken out by the NABEG (Act for the Acceleration of Network Expansion) from the scope of paragraph 15 ROG (Regional Planning Act) and paragraph 43 EnWG.

  16. A bi-level integrated generation-transmission planning model incorporating the impacts of demand response by operation simulation

    International Nuclear Information System (INIS)

    Zhang, Ning; Hu, Zhaoguang; Springer, Cecilia; Li, Yanning; Shen, Bo

    2016-01-01

    Highlights: • We put forward a novel bi-level integrated power system planning model. • Generation expansion planning and transmission expansion planning are combined. • The effects of two sorts of demand response in reducing peak load are considered. • Operation simulation is conducted to reflect the actual effects of demand response. • The interactions between the two levels can guarantee a reasonably optimal result. - Abstract: If all the resources in power supply side, transmission part, and power demand side are considered together, the optimal expansion scheme from the perspective of the whole system can be achieved. In this paper, generation expansion planning and transmission expansion planning are combined into one model. Moreover, the effects of demand response in reducing peak load are taken into account in the planning model, which can cut back the generation expansion capacity and transmission expansion capacity. Existing approaches to considering demand response for planning tend to overestimate the impacts of demand response on peak load reduction. These approaches usually focus on power reduction at the moment of peak load without considering the situations in which load demand at another moment may unexpectedly become the new peak load due to demand response. These situations are analyzed in this paper. Accordingly, a novel approach to incorporating demand response in a planning model is proposed. A modified unit commitment model with demand response is utilized. The planning model is thereby a bi-level model with interactions between generation-transmission expansion planning and operation simulation to reflect the actual effects of demand response and find the reasonably optimal planning result.

  17. Wind turbines and transmission systems for offshore wind projects in planning stage

    Energy Technology Data Exchange (ETDEWEB)

    Madariaga, Ander; Martin, Jose Luis; Martinez de Alegria, Inigo; Zamora, Inmaculada [University of the Basque Country (UPV/EHU), Bilbao (Spain). Engineering Faculty; Ceballos, Salvador [Parque Tecnologico de Bizkaia, Derio (Spain). Tecnalia Research and Innovation

    2012-07-01

    This paper reviews the current situation of the offshore wind turbines (OWTs) and the transmission systems (TSs) for offshore wind projects in the planning stage. Bearing in mind that offshore wind projects can last between seven and ten years from the first environmental studies to the commissioning, research engineers from companies and academia consider the solutions already available, but also to the new proposals expected to be ready in time for the project under consideration. Regarding the wind energy conversion systems (WECSs) installed in the OWTs, their main characteristics are reviewed considering turbines in the 4.1 to 10.0 MW range. Regarding the TSs, the current situation of point-to-point HVAC and HVDC links is presented, as well as some ideas related to future DC grids currently under study. (orig.)

  18. AC transmission network expansion planning considering circuits repowering and location of capacitors

    Directory of Open Access Journals (Sweden)

    Jaime A. López-López

    2016-07-01

    Full Text Available This paper deals with the Transmission Network Expansion Planning (TNEP problem. The TNEP consists of finding a set of new circuits on a power system, which is needed to attend a future demand. In its classical version, the TNEP only considers as solution candidates the addition of new lines and transformers. The main contribution of this paper consists in the inclusion of nonconventional solution candidates, namely the repowering of existing circuits and the location of capacitor banks. To take into account these last ones an AC model of the transmission network is considered. The solution of the proposed model is carried out using a Hybrid Genetic Algorithm. Results are compared and validated with previous works in the technical literature. The test systems used are the Garver system and IEEE 24 bus system. The results obtained in both systems showed that the inclusion of the non-conventional candidates, proposed in this paper, allows to reduce the cost of network expansion. This fact may be useful as an indicator for the system planner to consider new possibilities in the expansion studies.

  19. 76 FR 70122 - Plan for Conduct of 2012 Electric Transmission Congestion Study

    Science.gov (United States)

    2011-11-10

    ... regional reliability councils, regional transmission organizations (RTOs) and independent system operators... transmission organizations (RTOs), independent system operators (ISOs), and other stakeholders to describe...

  20. Water supply as a constraint on transmission expansion planning in the Western interconnection

    Science.gov (United States)

    Tidwell, Vincent C.; Bailey, Michael; Zemlick, Katie M.; Moreland, Barbara D.

    2016-12-01

    Consideration of water supply in transmission expansion planning (TEP) provides a valuable means of managing impacts of thermoelectric generation on limited water resources. Toward this opportunity, thermoelectric water intensity factors and water supply availability (fresh and non-fresh sources) were incorporated into a recent TEP exercise conducted for the electric interconnection in the Western United States. The goal was to inform the placement of new thermoelectric generation so as to minimize issues related to water availability. Although freshwater availability is limited in the West, few instances across five TEP planning scenarios were encountered where water availability impacted the development of new generation. This unexpected result was related to planning decisions that favored the development of low water use generation that was geographically dispersed across the West. These planning decisions were not made because of their favorable influence on thermoelectric water demand; rather, on the basis of assumed future fuel and technology costs, policy drivers and the topology of electricity demand. Results also projected that interconnection-wide thermoelectric water consumption would increase by 31% under the business-as-usual case, while consumption would decrease by 42% under a scenario assuming a low-carbon future. Except in a few instances, new thermoelectric water consumption could be accommodated with less than 10% of the local available water supply; however, limited freshwater supplies and state-level policies could increase use of non-fresh water sources for new thermoelectric generation. Results could have been considerably different if scenarios favoring higher-intensity water use generation technology or potential impacts of climate change had been explored. Conduct of this exercise highlighted the importance of integrating water into all phases of TEP, particularly joint management of decisions that are both directly (e.g., water

  1. Flexible Multi-Objective Transmission Expansion Planning with Adjustable Risk Aversion

    Directory of Open Access Journals (Sweden)

    Jing Qiu

    2017-07-01

    Full Text Available This paper presents a multi-objective transmission expansion planning (TEP framework. Rather than using the conventional deterministic reliability criterion, a risk component based on the probabilistic reliability criterion is incorporated into the TEP objectives. This risk component can capture the stochastic nature of power systems, such as load and wind power output variations, component availability, and incentive-based demand response (IBDR costs. Specifically, the formulation of risk value after risk aversion is explicitly given, and it aims to provide network planners with the flexibility to conduct risk analysis. Thus, a final expansion plan can be selected according to individual risk preferences. Moreover, the economic value of IBDR is modeled and integrated into the cost objective. In addition, a relatively new multi-objective evolutionary algorithm called the MOEA/D is introduced and employed to find Pareto optimal solutions, and tradeoffs between overall cost and risk are provided. The proposed approach is numerically verified on the Garver’s six-bus, IEEE 24-bus RTS and Polish 2383-bus systems. Case study results demonstrate that the proposed approach can effectively reduce cost and hedge risk in relation to increasing wind power integration.

  2. Optimizing Transmission Network Expansion Planning With The Mean Of Chaotic Differential Evolution Algorithm

    Directory of Open Access Journals (Sweden)

    Ahmed R. Abdelaziz

    2015-08-01

    Full Text Available This paper presents an application of Chaotic differential evolution optimization approach meta-heuristics in solving transmission network expansion planning TNEP using an AC model associated with reactive power planning RPP. The reliabilityredundancy of network analysis optimization problems implicate selection of components with multiple choices and redundancy levels that produce maximum benefits can be subject to the cost weight and volume constraints is presented in this paper. Classical mathematical methods have failed in handling non-convexities and non-smoothness in optimization problems. As an alternative to the classical optimization approaches the meta-heuristics have attracted lot of attention due to their ability to find an almost global optimal solution in reliabilityredundancy optimization problems. Evolutionary algorithms EAs paradigms of evolutionary computation field are stochastic and robust meta-heuristics useful to solve reliabilityredundancy optimization problems. EAs such as genetic algorithm evolutionary programming evolution strategies and differential evolution are being used to find global or near global optimal solution. The Differential Evolution Algorithm DEA population-based algorithm is an optimal algorithm with powerful global searching capability but it is usually in low convergence speed and presents bad searching capability in the later evolution stage. A new Chaotic Differential Evolution algorithm CDE based on the cat map is recommended which combines DE and chaotic searching algorithm. Simulation results and comparisons show that the chaotic differential evolution algorithm using Cat map is competitive and stable in performance with other optimization approaches and other maps.

  3. Joint Planning Of Energy Storage and Transmission Considering Wind-Storage Combined System and Demand Side Response

    Science.gov (United States)

    Huang, Y.; Liu, B. Z.; Wang, K. Y.; Ai, X.

    2017-12-01

    In response to the new requirements of the operation mode of wind-storage combined system and demand side response for transmission network planning, this paper presents a joint planning of energy storage and transmission considering wind-storage combined system and demand side response. Firstly, the charge-discharge strategy of energy storage system equipped at the outlet of wind farm and demand side response strategy are analysed to achieve the best comprehensive benefits through the coordination of the two. Secondly, in the general transmission network planning model with wind power, both energy storage cost and demand side response cost are added to the objective function. Not only energy storage operation constraints and but also demand side response constraints are introduced into the constraint condition. Based on the classical formulation of TEP, a new formulation is developed considering the simultaneous addition of the charge-discharge strategy of energy storage system equipped at the outlet of the wind farm and demand side response strategy, which belongs to a typical mixed integer linear programming model that can be solved by mature optimization software. The case study based on the Garver-6 bus system shows that the validity of the proposed model is verified by comparison with general transmission network planning model. Furthermore, the results demonstrate that the joint planning model can gain more economic benefits through setting up different cases.

  4. Characterization of the Transmission of the Elekta Stereotactic Body Frame (ESBF) and Accounting for it During Treatment Planning

    International Nuclear Information System (INIS)

    Becker, Stewart J.; Jozsef, Gabor; DeWyngaert, J. Keith

    2009-01-01

    The purpose of this study was to measure the transmission of the Elekta Stereotactic Body Frame (ESBF) and treatment table, to calculate the transmission of the frame in the Eclipse Treatment Planning System (TPS) using analytical anisotropic algorithm (AAA), and to demonstrate a simple method of accounting for this transmission in treatment planning. A solid water body phantom was imaged inside the ESBF and planned with multiple 3D-CRT fields using AAA using both 6-MV and 16-MV energies. In the first set of plans, the frame and table were included in the 'Body' contour and, therefore, used in the dose calculations. In the second set of plans, the frame and the table were not included in the 'Body' contour and, therefore, were not incorporated in the calculations. The latter simulated a setup in which there was no frame or table. Eclipse TPS will only incorporate data from the CT set in calculations, if it is included in the 'Body' contour. The plans were treated under two conditions: one with the phantom in the ESBF and one without the frame on a specially designed table. This table allows all the beams to enter the phantom without passing through any attenuating material (i.e., table or frame). Transmission of the frame and table was determined by the ratio of the measurements with the frame and table to the measurements without them. To validate the accuracy of the calculation model, plans with homogeneous phantom and a heterogeneous plan were compared with the measurements. The transmission of the frame varies from 89-94% depending on the angle of the beams and whether they also intercept the table. The AAA algorithm calculated the transmission of the frame and table to within 2% of the measurements for all gantry angles. Validation results showed that AAA can calculate the dose to the target to within 2% of the measured value. The attenuation caused by the ESBF must be accounted for in the planning process. For Eclipse, the frame should be contoured and

  5. 2015 Plan. Project 7: the environmental issue and the electrical sector. Transmission systems

    International Nuclear Information System (INIS)

    1992-10-01

    The main impacts in socio-environmental analysis of transmission lines and substations for expansion of the Brazilian electrical sector are described, showing the actions of social compensation aiming a better insertion of the transmission lines and the substations. The issues relating with the natural and native reserves, the supply to the large consumer centers and the socio-environmental licensing of transmission enterprises are also discussed. (C.G.C.)

  6. The contribution of family planning towards the prevention of vertical HIV transmission in Uganda.

    Directory of Open Access Journals (Sweden)

    Wolfgang Hladik

    Full Text Available BACKGROUND: Uganda has one of the highest total fertility rates (TFR worldwide. We compared the effects of antiretroviral (ARV prophylaxis for the prevention of mother-to-child HIV transmission (PMTCT to that of existing family planning (FP use and estimated the burden of pediatric HIV disease due to unwanted fertility. METHODOLOGY/PRINCIPAL FINDINGS: Using the demographic software Spectrum, a baseline mathematical projection to estimate the current pediatric HIV burden in Uganda was compared to three hypothetical projections: 1 without ARV-PMTCT (to estimate the effect of ARV-PMTCT, 2 without contraception (effect of existing FP use, 3 without unwanted fertility (effect of unmet FP needs. Key input parameters included HIV prevalence, ARV-PMTCT uptake, MTCT probabilities, and TFR. We estimate that in 2007, an estimated 25,000 vertical infections and 17,000 pediatric AIDS deaths occurred (baseline projection. Existing ARV-PMTCT likely averted 8.1% of infections and 8.5% of deaths. FP use likely averted 19.7% of infections and 13.1% of deaths. Unwanted fertility accounted for 21.3% of infections and 13.4% of deaths. During 2008-2012, an estimated 131,000 vertical infections and 71,000 pediatric AIDS deaths will occur. The projected scale up of ARV-PMTCT (from 39%-57% may avert 18.1% of infections and 24.5% of deaths. Projected FP use may avert 21.6% of infections and 18.5% of deaths. Unwanted fertility will account for 24.5% of infections and 19.8% of deaths. CONCLUSIONS: Existing FP use contributes as much or more than ARV-PMTCT in mitigating pediatric HIV in Uganda. Expanding FP services can substantially contribute towards PMTCT.

  7. Optimal Planning of the Nordic Transmission System with 100% Electric Vehicle Penetration of passenger cars by 2050

    DEFF Research Database (Denmark)

    Graabak, Ingeborg; Wu, Qiuwei; Warland, Leif

    2016-01-01

    This paper presents the optimal planning of the Nordic backbone transmission system with 100% electric vehicle penetration of passenger cars by 2050. Electric vehicles will play an important role in the future energy systems and can reduce the greenhouse gas emission from the transport sector....... However, the electric vehicles will increase the electricity consumption and might induce congestions in the transmission systems. In order to deal with the electricity consumption increase from the electric vehicle integration into the power system and maximize the social welfare, the optimal investments...... of the Nordic transmission system are studied. Case studies were conducted using the market simulation model EMPS and two electric vehicle charging scenarios: a spot price based scenario and a dumb charging scenario. The electric vehicle charging power is assumed to be 3.68 kW with 1 phase 16A. The complete...

  8. The Impacts of Outsourcing on the Organisation & Economy : A Critical Look on Ericsson Transmission Planning Outsourced to India

    OpenAIRE

    Mirza, Afzal

    2012-01-01

    Globalisation is a phenomenon that has made the world shrink and business has crossed borders. To add over the advancement in technology has made this much easier. Companies are now indulging in outsourcing for many reasons. Recently, an increasing number of British firms have outsourced the IT and IS to India and other countries. Specifically, this study evaluates the Ericsson outsourcing its transmission planning to India and why are they doing so and how are they managing them. It also eva...

  9. SEA for strategic grid planning in South Africa: Enabling the efficient and effective roll out of strategic electricity transmission infrastructure

    CSIR Research Space (South Africa)

    Fischer, TD

    2016-05-01

    Full Text Available | Resilience and Sustainability 36th Annual Conference of the International Association for Impact Assessment 11 - 14 May 2016 | Nagoya Congress Center | Aichi-Nagoya | Japan | www.iaia.org SEA FOR STRATEGIC GRID PLANNING IN SOUTH AFRICA: Enabling... the efficient and effective roll out of strategic electricity transmission infrastructure Abstract ID: 409 Authors: Marshall Mabin(1) , Paul Lochner and Dee Fischer Council for Scientific and Industrial Research (CSIR), PO Box 320 Stellenbosch 7599 South...

  10. An analysis of land use planning and equity issues surrounding hazardous liquid and natural gas transmission pipelines in North Carolina

    Science.gov (United States)

    Osland, Anna Christine

    Hazardous liquid and natural gas transmission pipelines have received limited attention by planning scholars even though local development decisions can have broad consequences if a rupture occurs. In this dissertation, I evaluated the implications of land-use planning for reducing risk to transmission pipeline hazards in North Carolina via three investigations. First, using a survey of planning directors in jurisdictions with transmission pipeline hazards, I investigated the land use planning tools used to mitigate pipeline hazards and the factors associated with tool adoption. Planning scholars have documented the difficulty of inducing planning in hazardous areas, yet there remain gaps in knowledge about the factors associated with tool adoption. Despite the risks associated with pipeline ruptures, I found most localities use few mitigation tools, and the adoption of regulatory and informational tools appear to be influenced by divergent factors. Whereas risk perception, commitment, capacity, and community context were associated with total tool and information tool use, only risk perception and capacity factors were associated with regulatory tool use. Second, using interviews of emergency managers and planning directors, I examined the role of agency collaboration for building mitigation capacity. Scholars have highlighted the potential of technical collaboration, yet less research has investigated how inter-agency collaboration shapes mitigation capacity. I identify three categories of technical collaboration, discuss how collaborative spillovers can occur from one planning area to another, and challenge the notion that all technical collaborations result in equal mitigation outcomes. Third, I evaluated characteristics of the population near pipelines to address equity concerns. Surprisingly, I did not find broad support for differences in exposure of vulnerable populations. Nonetheless, my analyses uncovered statistically significant clusters of vulnerable

  11. Optimal planning of the Nordic transmission system with 100% electric vehicle penetration of passenger cars by 2050

    International Nuclear Information System (INIS)

    Graabak, Ingeborg; Wu, Qiuwei; Warland, Leif; Liu, Zhaoxi

    2016-01-01

    This paper presents the optimal planning of the Nordic backbone transmission system with 100% electric vehicle penetration of passenger cars by 2050. Electric vehicles will play an important role in the future energy systems and can reduce the greenhouse gas emission from the transport sector. However, the electric vehicles will increase the electricity consumption and might induce congestions in the transmission systems. In order to deal with the electricity consumption increase from the electric vehicle integration into the power system and maximize the social welfare, the optimal investments of the Nordic transmission system are studied. Case studies were conducted using the market simulation model EMPS (Efi's multi-area power market simulator) and two electric vehicle charging scenarios: a spot price based scenario and a dumb charging scenario. The electric vehicle charging power is assumed to be 3.68 kW with 1 phase 16 A. The complete electrification of the private passenger fleet increases the yearly power demand in the Nordic region with ca 7.5%. The profitable increases in transmission capacities are highest for dumb charging, but are very low for both dumb and spot price based charging compared to a Reference case. - Highlights: • The electric vehicle distribution is done using population and car statistics. • The 100% penetration electric vehicle demand is obtained for Nordic countries. • The optimal investments in the Nordic transmission system with electric vehicles are studied.

  12. New plans for increasing transmission and intertie capacity : moving towards a more integrated power market in Atlantic Canada

    International Nuclear Information System (INIS)

    Roberge, F.

    2003-01-01

    This PowerPoint presentation provided a brief review of the electric power industry in Quebec after deregulation. It included an outline of non-regulated activity and regulated activities in terms of power generation, transmission, distribution and customer service. Both the transmission and distribution components of the power industry in Quebec are regulated by the Regie de l'energie. Transmission networks offer access to all wholesalers. Quebec does not have an energy spot market and electricity prices are currently very low. Hydro-Quebec TransEnergie was created in 1997 as a functionally independent open access transmission provider with high reliability standards. TransEnergie can address seams issues with neighbouring networks. The three types of services offered in terms of tariffs were also discussed in this presentation along with data regarding Hydro-Quebec assets, revenue and net income. Hydro-Quebec's relation with the Atlantic provinces were also described. Interconnection with New Brunswick totals 785 MW. No new interconnection is planned. 1 tab., 4 figs

  13. A cooperative game theory approach to transmission planning in power systems

    Science.gov (United States)

    Contreras, Javier

    The rapid restructuring of the electric power industry from a vertically integrated entity into a decentralized industry has given rise to complex problems. In particular, the transmission component of the electric power system requires new methodologies to fully capture this emerging competitive industry. Game theory models are used to model strategic interactions in a competitive environment. This thesis presents a new decentralized framework to study the transmission network expansion problem using cooperative game theory. First, the players and the rules of the game are defined. Second, a coalition formation scheme is developed. Finally, the optimized cost of expansion is allocated based on the history of the coalition formation.

  14. A projection-adapted cross entropy (PACE) method for transmission network planning

    Energy Technology Data Exchange (ETDEWEB)

    Eshragh, Ali; Filar, Jerzy [University of South Australia, School of Mathematics and Statistics, Mawson Lakes, SA (Australia); Nazar, Asef [University of South Australia, Institute for Sustainable Systems Technologies, School of Mathematics and Statistics, Mawson Lakes, SA (Australia)

    2011-06-15

    In this paper, we propose an adaptation of the cross entropy (CE) method called projection-adapted CE (PACE) to solve a transmission expansion problem that arises in management of national and provincial electricity grids. The aim of the problem is to find an expansion policy that is both economical and operational from the technical perspective. Often, the transmission network expansion problem is mathematically formulated as a mixed integer nonlinear program that is very challenging algorithmically. The challenge originates from the fact that a global optimum should be found despite the presence, of possibly a huge number, of local optima. The PACE method shows promise in solving global optimization problems regardless of continuity or other assumptions. In our approach, we sample the integer variables using the CE mechanism, and solve LPs to obtain matching continuous variables. Numerical results, on selected test systems, demonstrate the potential of this approach. (orig.)

  15. Big Pylons: Mixed signals for transmission. Spatial planning for energy distribution

    International Nuclear Information System (INIS)

    Ritchie, Heather; Hardy, Maelíosa; Lloyd, M. Greg; McGreal, Stanley

    2013-01-01

    The effective delivery of a sustainable energy future raises many challenges in relation to energy distribution where a new understanding of spatial planning is needed in relation to energy production, consumption and storage. Understanding the emergent low carbon energy economy in terms of its production, distribution and consumption characteristics has prompted a deliberate spatial planning interest. This paper examines issues relating to spatial planning, regulation, political legitimacy and accountability in the current and future systems for energy distribution. In particular it examines the Beauly Denny public inquiry in Scotland as a case study in terms of demonstrating the changing state–market–civil relations in an energy transition context with differentiated values and interests. The case study highlights implications for the regulation in the public interest of highly contested spaces, places and development schemes, together with a synopsis of government structure and change that is influencing the future of spatial planning and energy distribution in particular. - Highlights: • We examine links between spatial planning and regulation of energy distribution. • We examine the Beauly Denny public inquiry in Scotland. • We highlight challenges surrounding the development of a resilient energy system. • We highlight links between spatial planning and infrastructural development

  16. Transmission Planning Process and Opportunities for Utility-Scale Solar Engagement within the Western Electricity Coordinating Council (WECC)

    Energy Technology Data Exchange (ETDEWEB)

    Hein, J.; Hurlbut, D.; Milligan, M.; Coles, L.; Green, B.

    2011-11-01

    This report is a primer for solar developers who wish to engage directly in expediting the regulatory process and removing market barriers related to policy and planning. Market barriers unrelated to technology often limit the expansion of utility-scale solar power, even in areas with exceptional resource potential. Many of these non-technical barriers have to do with policy, regulation, and planning, and hardly ever do they resolve themselves in a timely fashion. In most cases, pre-emptive intervention by interested stakeholders is the easiest way to remove/address such barriers, but it requires knowing how to navigate the institutional waters of the relevant agencies and boards. This report is a primer for solar developers who wish to engage directly in expediting the regulatory process and removing market barriers related to policy and planning. It focuses on the Western Interconnection (WI), primarily because the quality of solar resources in the Southwest makes utility-scale concentrating solar power (CSP) and photovoltaics (PV) economically feasible, and because the relevant institutions have evolved in a way that has opened up opportunities for removing non-technical market barriers. Developers will find in this report a high-level field manual to identify the venues for mitigating and possibly eliminating systemic market obstacles and ensuring that the economic playing field is reasonably level. Project-specific issues such as siting for transmission and generation resources are beyond the scope of this report. Instead, the aim is to examine issues that pervasively affect all utility-scale PV and CSP in the region regardless of where the project may be. While the focus is on the WI, many of the institutions described here also have their counterparts in the Eastern and the Texas interconnections. Specifically, this report suggests a number of critical engagement points relating to generation and transmission planning.

  17. Lost in transmission : a comprehensive critique of the BC energy plan

    International Nuclear Information System (INIS)

    Shaffer, M.; Hove, J.; Yamashita, J.

    2007-06-01

    This document presented an independent critique and review of the British Columbia (BC) 2007 energy plan. The critique focused on BC hydro-related policies in the energy plan, and was presented in three policy papers. The first paper addressed self-sufficiency and insurance issues. It examined the need for new sources of electricity supply in terms of imports and other market purchases that are currently used to meet BC Hydro's requirements. The second paper addressed BC Hydro electricity rates and the impacts and costs of buying high and selling low. It identified the impacts and costs of the low electricity rate policy in the energy plan, a policy that would inflate the demand for electricity and exaggerate the need for new sources of power caused by the self-sufficiency and insurance policies in the energy plan. Specifically, the second paper discussed BC Hydro rates under the energy plan, the limitations of power smart programs, distributional issues and alternative strategy. The third paper addressed supply issues in the energy plan, with particular reference to targeting low value/high cost resources. It focused on the types of resources BC Hydro had to acquire. It specifically addressed the pressure to acquire run-of-river and wind energy which, despite their superficial appeal, are low in value and high in cost, and could have significant environmental impact. It was concluded that despite the attempt to address environmental concerns, the province's energy plan is designed to artificially increase the market for new independent power producer supply. 76 refs., 9 tabs., 4 figs

  18. Flexible Transmission Network Expansion Planning Considering Uncertain Renewable Generation and Load Demand Based on Hybrid Clustering Analysis

    Directory of Open Access Journals (Sweden)

    Yun-Hao Li

    2015-12-01

    Full Text Available This paper presents a flexible transmission network expansion planning (TNEP approach considering uncertainty. A novel hybrid clustering technique, which integrates the graph partitioning method and rough fuzzy clustering, is proposed to cope with uncertain renewable generation and load demand. The proposed clustering method is capable of recognizing the actual cluster distribution of complex datasets and providing high-quality clustering results. By clustering the hourly data for renewable generation and load demand, a multi-scenario model is proposed to consider the corresponding uncertainties in TNEP. Furthermore, due to the peak distribution characteristics of renewable generation and heavy investment in transmission, the traditional TNEP, which caters to rated renewable power output, is usually uneconomic. To improve the economic efficiency, the multi-objective optimization is incorporated into the multi-scenario TNEP model, while the curtailment of renewable generation is considered as one of the optimization objectives. The solution framework applies a modified NSGA-II algorithm to obtain a set of Pareto optimal planning schemes with different levels of investment costs and renewable generation curtailments. Numerical results on the IEEE RTS-24 system demonstrated the robustness and effectiveness of the proposed approach.

  19. Planning the expansion of transmission with evolutionary programming; Planeacion de la expansion de transmision con programacion evolutiva

    Energy Technology Data Exchange (ETDEWEB)

    Ceciliano Meza, Jose Luis; Nieva Gomez, Rolando [Instituto de Investigaciones Electricas, Temixco, Morelos (Mexico)

    1999-07-01

    A method of evolutionary programming for the planning of transmission networks in electrical power systems is presented. This is a whole problem mixed and nonlinear, with a combinatory nature that leads to a very large number of possible solutions for electrical systems of medium and large scale. The problem of transmission planning is described briefly and later it is formulated in mathematical terms. The proposed algorithm of evolutionary programming is applied to a large scale network that is representative of the Mexican electrical system. [Spanish] Se presenta un metodo de programacion evolutiva para la planeacion de redes de transmision en sistemas electricos de potencia. Este es un problema entero mixto y no lineal, con una naturaleza combinatoria que conduce a un numero muy grande de soluciones posibles para sistemas electricos de mediana y gran escala. Se describe brevemente el problema de planeacion de transmision y posteriormente se formula en terminos matematicos. El algoritmo propuesto de programacion evolutiva se aplica a una red electrica de gran escala que es representativa del sistema electrico Mexicano.

  20. Resource Planning for Voice over Wireless Both-Way Transmission Media

    Directory of Open Access Journals (Sweden)

    B. Tsankov

    2008-04-01

    Full Text Available The medium in IEEE 802.11- and IEEE 802.16-based networks for voice communications can be considered "both-way" - for transmission and reception. Therefore, the packet arrivals for voice dialogue services in such networks are not strictly independent. In this paper, we discuss the traffic capacity in the call (network layer and suggest accounting for the impact of the correlated nature of two-way voice conversations on performance estimation. We present analytical results and numerical examples.

  1. EDF's new environment-oriented method for planning the Extra High Voltage transmission network

    International Nuclear Information System (INIS)

    Trogneux, F.; Doquet, M.; Blondel, H.; Mallet, P.

    1996-01-01

    As EDF is experiencing increasing difficulties to develop its transmission network, the time may have come to reconsider the project selection method. In this paper, we point out that the currently used method essentially relies on a classical discounted balance criterion. We then present a new method taking into account the impact of a project on the environment by considering an environmental risk which may jeopardize the project's success. This method helps to evaluate the probability that each possible route of each project will be carried through. A simple probability computation then allows us to derive a global comparison of the eligible projects on the basis of an expected discounted balance criterion. Experiments now in progress will help to decide upon this method's efficiency in the context of an operational use. (author). 5 figs., 1 tab., 4 refs

  2. The economics of planning electricity transmission to accommodate renewables: Using two-stage optimisation to evaluate flexibility and the cost of disregarding uncertainty

    International Nuclear Information System (INIS)

    Weijde, Adriaan Hendrik van der; Hobbs, Benjamin F.

    2012-01-01

    Aggressive development of renewable electricity sources will require significant expansions in transmission infrastructure. We present a stochastic two-stage optimisation model that captures the multistage nature of transmission planning under uncertainty and use it to evaluate interregional grid reinforcements in Great Britain (GB). In our model, a proactive transmission planner makes investment decisions in two time periods, each time followed by a market response. Uncertainty is represented by economic, technology, and regulatory scenarios, and first-stage investments must be made before it is known which scenario will occur. The model allows us to identify expected cost-minimising first-stage investments, as well as estimate the value of information, the cost of ignoring uncertainty, and the value of flexibility. Our results show that ignoring risk in planning transmission for renewables has quantifiable economic consequences, and that considering uncertainty can yield decisions that have lower expected costs than traditional deterministic planning methods. In the GB case, the value of information and cost of disregarding uncertainty in transmission planning were of the same order of magnitude (approximately £100 M, in present worth terms). Further, the best plan under a risk-neutral decision criterion can differ from the best under risk-aversion. Finally, a traditional sensitivity analysis-based robustness analysis also yields different results than the stochastic model, although the former's expected cost is not much higher.

  3. Planning of the energy generation system expansion taking into account transmission lines; Planejamento da expansao do sistema de geracao considerando redes de transmissao

    Energy Technology Data Exchange (ETDEWEB)

    Lucio, Joao Carlos Martins

    1990-12-31

    This work presents the proposal of a methodology which, by exploring the interaction between generation and transmission systems expansion studies, aims for an Integrated Planning of Power Systems. It intends to emphasize the Integrated Planning importance so as to improve the utilization of the available resources in the electric sector and to reduce the expansion and operational costs. The work describes a procedure to consider explicitly the network for the determination of a generation system construction schedule. It considers that the transmission lines construction costs have a significant weight so that it can modify the initial generation expansion plan with the anticipation of some investments and the postponement of others, decreasing the global expansion costs. The generation and transmission systems expansion is made in an optimal way using a Graph Search Algorithm. Finally the best Integrated Plan is obtained from a final algorithm that generates a sequence of integrated plans from combination of generation and transmission algorithms. These plans are compared from a global cost point of view until a convergence criterion has been satisfied. (author) 18 refs., 5 figs., 28 tabs.

  4. Planning of the energy generation system expansion taking into account transmission lines; Planejamento da expansao do sistema de geracao considerando redes de transmissao

    Energy Technology Data Exchange (ETDEWEB)

    Lucio, Joao Carlos Martins

    1991-12-31

    This work presents the proposal of a methodology which, by exploring the interaction between generation and transmission systems expansion studies, aims for an Integrated Planning of Power Systems. It intends to emphasize the Integrated Planning importance so as to improve the utilization of the available resources in the electric sector and to reduce the expansion and operational costs. The work describes a procedure to consider explicitly the network for the determination of a generation system construction schedule. It considers that the transmission lines construction costs have a significant weight so that it can modify the initial generation expansion plan with the anticipation of some investments and the postponement of others, decreasing the global expansion costs. The generation and transmission systems expansion is made in an optimal way using a Graph Search Algorithm. Finally the best Integrated Plan is obtained from a final algorithm that generates a sequence of integrated plans from combination of generation and transmission algorithms. These plans are compared from a global cost point of view until a convergence criterion has been satisfied. (author) 18 refs., 5 figs., 28 tabs.

  5. Scenario calculations for the 2012 grid development plan. Overdimensioned HVDC transmission lines; Szenarienrechnungen zum Netzentwicklungsplan (NEP) 2012. HGUe-Leitungen ueberdimensioniert

    Energy Technology Data Exchange (ETDEWEB)

    Oei, Pao-Yu; Sander, Aram; Hankel, Lisa; Laurisch, Lilian; Lorenz, Casimir [Technische Univ. Berlin (Germany); Schroeder, Andreas [Deutsches Institut fuer Wirtschaftsforschung, Berlin (Germany)

    2012-09-15

    The grid development plan presented in June 2012 by the German Federal Network Agency envisages a large number of new AC and DC transmission lines for Germany. The purpose of these transmission lines is to facilitate the point-to-point transport of electricity produced from renewable resources to load centres. The authors present a model-assisted analysis of the impact of these transmission lines on the structure of electricity production. They also investigate to what extent an increase in storage capacity and the steering of demand can serve as alternatives to grid expansion.

  6. National development plan for transmission arrangement in the electric power system 1995-2005; Nasjonal utbyggingsplan for overfoeringsanlegg i elkraftsystemet 1995-2005

    Energy Technology Data Exchange (ETDEWEB)

    Moi, K.A.; Trengereid, F.

    1996-09-01

    The report concerns the national development plan for the electric power transmission system in Norway. The aim of the plan is to give a simple and collected survey of estimated demand of investment connected to the regional and central grids in the period from 1995 to 2005 based on these development plans, and to give a survey over the different power and energy prognoses being used. There is emphasized that the work of planning is a continuous process where changed premises can make an influence on both the schedule and the extent of necessary measures. The investment is calculated to be about NOK 15 billion in the period mentioned which comprise both new system designs and modernization of existing transmission systems. Dimensioned power capacity and the energy consumption are assumed to increase on an average of about 1.8 per cent towards the year of 2010. 10 figs., 2 tabs.

  7. Transmission issues

    International Nuclear Information System (INIS)

    Bradford, J.; Wilson, L.; Thon, S.; Millar, N.

    2005-01-01

    This session on transmission issues focused on the role that transmission plays in electricity markets and the importance of getting the market structure right in terms of generation divestiture with buy back contracts, demand side responsive programs, transmission upgrades and long term contracts. The difficulties of distinguishing between market power and scarcity were examined along with some of the complications that ensue if transmission experiences congestion, as exemplified by the August 2003 blackout in eastern North America. The presentations described the best ways to handle transmission issues, and debated whether transmission should be deregulated or follow market forces. Issues of interconnections and reliability of connections were also debated along with the attempt to integrate renewables into the grid. Some presentations identified what new transmission must be built and what must be done to ensure that transmission gets built. The challenges and business opportunities for transmission in Alberta were discussed with reference to plans to invest in new infrastructure, where it is going outside of the province and how it works with other jurisdictions. Manitoba's Conawapa Hydro Project and its 2000 MW tie line to Ontario was also discussed. Some examples of non-optimal use of interconnections in Europe were also discussed in an effort to learn from these mistakes and avoid them in Canada. tabs., figs

  8. Investigating the impact of unanticipated market and construction delays on the development of a meshed HVDC grid using dynamic transmission planning

    NARCIS (Netherlands)

    Shariat Torbaghan, S.; Gibescu, M.; Rawn, B.G.; Müller, H.; Roggenkamp, M.; vd Meijden, M.A.M.M.

    2015-01-01

    This study presents a market-based dynamic transmission planning framework for the construction of a meshed offshore voltage source converter-high voltage direct current (VSC-HVDC) grid. Such a grid is foreseen for integrating offshore wind and electricity trade functions among the North Sea

  9. Characterization of a new transmission detector for patient individualized online plan verification and its influence on 6MV X-ray beam characteristics

    Energy Technology Data Exchange (ETDEWEB)

    Thoelking, Johannes; Sekar, Yuvaraj; Fleckenstein, Jens; Lohr, Frank; Wenz, Frederik; Wertz, Hansjoerg [Heidelberg Univ., University Medical Center Mannheim (Germany). Dept. of Radiation Oncology

    2016-11-01

    Online verification and 3D dose reconstruction on daily patient anatomy have the potential to improve treatment delivery, accuracy and safety. One possible implementation is to recalculate dose based on online fluence measurements with a transmission detector (TD) attached to the linac. This study provides a detailed analysis of the influence of a new TD on treatment beam characteristics. The influence of the new TD on surface dose was evaluated by measurements with an Advanced Markus Chamber (Adv-MC) in the build-up region. Based on Monte Carlo simulations, correction factors were determined to scale down the over-response of the Adv-MC close to the surface. To analyze the effects beyond d{sub max} percentage depth dose (PDD), lateral profiles and transmission measurements were performed. All measurements were carried out for various field sizes and different SSDs. Additionally, 5 IMRT-plans (head and neck, prostate, thorax) and 2 manually created test cases (3 x 3 cm{sup 2} fields with different dose levels, sweeping gap) were measured to investigate the influence of the TD on clinical treatment plans. To investigate the performance of the TD, dose linearity as well as dose rate dependency measurements were performed. With the TD inside the beam an increase in surface dose was observed depending on SSD and field size (maximum of +11%, SSD = 80 cm, field size = 30 x 30 cm{sup 2}). Beyond d{sub max} the influence of the TD on PDDs was below 1%. The measurements showed that the transmission factor depends slightly on the field size (0.893-0.921 for 5 x 5 cm{sup 2} to 30 x 30 cm{sup 2}). However, the evaluation of clinical IMRT-plans measured with and without the TD showed good agreement after using a single transmission factor (γ{sub (2%/2mm)} > 97%, δ{sub ±3%} >95%). Furthermore, the response of TD was found to be linear and dose rate independent (maximum difference <0.5% compared to reference measurements). When placed in the path of the beam, the TD introduced

  10. Remote sensing for industrial applications in the energy business: digital territorial data integration for planning of overhead power transmission lines (OHTLs)

    Science.gov (United States)

    Terrazzino, Alfonso; Volponi, Silvia; Borgogno Mondino, Enrico

    2001-12-01

    An investigation has been carried out, concerning remote sensing techniques, in order to assess their potential application to the energy system business: the most interesting results concern a new approach, based on digital data from remote sensing, to infrastructures with a large territorial distribution: in particular OverHead Transmission Lines, for the high voltage transmission and distribution of electricity on large distances. Remote sensing could in principle be applied to all the phases of the system lifetime, from planning to design, to construction, management, monitoring and maintenance. In this article, a remote sensing based approach is presented, targeted to the line planning: optimization of OHTLs path and layout, according to different parameters (technical, environmental and industrial). Planning new OHTLs is of particular interest in emerging markets, where typically the cartography is missing or available only on low accuracy scale (1:50.000 and lower), often not updated. Multi- spectral images can be used to generate thematic maps of the region of interest for the planning (soil coverage). Digital Elevation Models (DEMs), allow the planners to easily access the morphologic information of the surface. Other auxiliary information from local laws, environmental instances, international (IEC) standards can be integrated in order to perform an accurate optimized path choice and preliminary spotting of the OHTLs. This operation is carried out by an ABB proprietary optimization algorithm: the output is a preliminary path that bests fits the optimization parameters of the line in a life cycle approach.

  11. Regulatory Impacts on Distributed Generation and Upstream Transmission Substation Expansion Planning: A Novel Stochastic Bi-level Model

    Directory of Open Access Journals (Sweden)

    F. Misaghi

    2017-06-01

    Full Text Available In this paper, a novel framework is proposed to study impacts of regulatory incentive on distributed generation (DG investment in sub-transmission substations, as well as upgrading of upstream transmission substations. Both conventional and wind power technologies are considered here. Investment incentives are fuel cost, firm contracts, capacity payment and investment subsidy relating to wind power. The problem is modelled as a bi-level stochastic optimization problem, where the upper level consists of investor's decisions maximizing its own profit. Both market clearing and decision on upgrading of transmission substation aiming at minimizing the total cost are considered in the lower level. Due to non-convexity of the lower level and impossibility of converting to single level problem (i.e. mathematical programming with equilibrium constraints (MPEC, an algorithm combing enumeration and mathematical optimization is used to tackle with the non-convexity. For each upgrading strategy of substations, a stochastic MPEC, converted to a mixed integer linear programming (MILP is solved. The proposed model is examined on a six-bus and an actual network. Numerical studies confirm that the proposed model can be used for analysing investment behaviour of DGs and substation expansion.

  12. Methodology for prioritizing projects considering the generation, transmission and distribution integrated planning and the financial restraints; Metodologia para priorizacao de projetos, considerando o planejamento integrado de geracao, transmissao e distribuicao e as restricoes financeiras

    Energy Technology Data Exchange (ETDEWEB)

    Souza, Denis Claudio Cruz de; Andrade, Eduardo Leopoldino de; Pimentel, Elson Luiz de Almeida; Pinto, Everton Barroso [Companhia Energetica de Minas Gerais (CEMIG), Belo Horizonte, MG (Brazil)

    1995-12-31

    This technical report presents a methodology for economical evaluation and work design priorities in the electric system and the experience of CEMIG, an electric power utility of State of Minas Gerais - Southeast Brazil, in defining its transmission expansion plan. It is presented and discussed the concept of integrated projects for expansion, involving generation, transmission, distribution, automation and telecommunication works 3 refs., 3 figs., 1 tab.

  13. Planning the expansion of electrical transmission networks with evolutionary programming; Planeacion de la expansion de redes de transmision electrica con programacion evolucionaria

    Energy Technology Data Exchange (ETDEWEB)

    Ceciliano Meza, Jose Luis

    1997-12-31

    In this work it is presented for the first time in the literature the solution of the problem of the planning the expansion of an electrical transmission network (PERTE) with the use of the Evolutionary Programming. The evolutionary programming is a stochastic method of optimization with similar characteristics to the generic algorithms, but different. During the development of this work it is shown what each one of these two heuristic methods of optimization consist of. Additionally, the main characteristics of other two heuristic methods known in the literature are described (Tabu Searching and Simulated Annealing). These two methods together with the genetic algorithms and decomposition of Benders have also been used to solve the problem of planning PERTE. The operation of the proposed algorithm of evolutionary programming was tested in two networks of electrical transmission. The first case of test is a system which is known in the literature. The second case is a representative system of the electrical transmission network of Central America. The results obtained improve all the results shown when applying different heuristic methods of optimization (genetic algorithms, simulated annealing and Tabu searching) to solve the same problem. [Espanol] En este trabajo se presenta por primera vez en la literatura, la solucion del problema de la planeacion de expansion de una red de transmision electrica (PERTE) con el uso de la Programacion Evolucionaria. La programacion evolucionaria es un metodo estocastico de optimizacion con caracteristicas similares a los algoritmos geneticos, pero diferente. Durante el desarrollo de este trabajo se muestra en que consiste cada uno de estos dos metodos heuristicos de optimizacion. Ademas, se describen las caracteristicas principales de otros dos metodos heuristicos conocidos en la literatura (busqueda Tabu y Recorrido Simulado). Estos dos metodos juntos con los algoritmos geneticos y descomposicion de Benders tambien han sido

  14. A computational model for determining the minimal cost expansion alternatives in transmission systems planning; Um modelo computacional para determinacao de alternativas de expansao de custo minimo em planejamento de sistemas de transmissao

    Energy Technology Data Exchange (ETDEWEB)

    Pinto, L M.V.G.; Pereira, M V.F. [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil); Nunes, A [ELETROBRAS, Rio de Janeiro, RJ (Brazil)

    1990-12-31

    A computational model for determining an economical transmission expansion plan, based in the decomposition techniques is presented. The algorithm was used in the Brazilian South System and was able to find an optimal solution, with a low computational resource. Some expansions of this methodology are been investigated: the probabilistic one and the expansion with financier restriction. (C.G.C.). 4 refs, 7 figs.

  15. Towards an optimal transmission system

    International Nuclear Information System (INIS)

    Calviou, M.

    2005-01-01

    This presentation provided background on National Grid USA and discussed transmission investment in the United States (US) and United Kingdom. It also discussed barriers to transmission investments and improvements, thoughts on solutions and a long-term vision. The presentation identified that transmission investment should follow from clear reliability rules designed to promote better operation and management; investment does not necessarily mean new rights-of-way; and transmission investment should target benefits to customers. It was stated that US transmission investment levels have decreased. A comparison between US and UK transmission investment was presented along with a chart of increasing US congestion costs. Barriers to investment in US transmission include vertical integration; misperception of transmission as a market product; federal and state jurisdiction issues; fragmentation in transmission ownership and operation; rate cap based plans that impact transmission; lack of clarity in cost allocation; and the site selection process. Possible solutions include policy and incentives, promoting independence and resolving structural issues. tabs., figs

  16. Neuroglial Transmission

    DEFF Research Database (Denmark)

    Gundersen, Vidar; Storm-Mathisen, Jon; Bergersen, Linda Hildegard

    2015-01-01

    as a signaling substance recently shown to act on specific lactate receptors in the brain. Complementing neurotransmission at a synapse, neuroglial transmission often implies diffusion of the transmitter over a longer distance and concurs with the concept of volume transmission. Transmission from glia modulates...... synaptic neurotransmission based on energetic and other local conditions in a volume of tissue surrounding the individual synapse. Neuroglial transmission appears to contribute significantly to brain functions such as memory, as well as to prevalent neuropathologies....

  17. Public participation in planning procedures for the expansion of extra-high voltage transmission systems under the Energy Economy Law and the Law for Accelerated Network Expansion for Transmission Systems; Buergerbeteiligung in den Planungsverfahren zum Hoechstspannungsnetzausbau nach EnWG und NABEG

    Energy Technology Data Exchange (ETDEWEB)

    Weingarten, Elke; Peters, Wolfgang [Bosch and Partner GmbH, Berlin (Germany); Mueller-Pfannenstiel, Klaus [Bosch and Partner GmbH, Herne (Germany)

    2013-05-15

    The energy turnaround necessitates an expansion of the existing power transmission grid on a large scale and within a very short time frame. These measures will in all probability not be realisable without incurring conflicts with citizens affected by them. The topic of public participation should therefore be given very high priority from the very beginning of grid construction planning by systematically providing opportunities for citizens as representatives of the public at large to participate in decision making processes.

  18. Dynamic synthesis for the energy transmission systems long term planning; Sintese dinamica para o planejamento a longo prazo de sistemas de transmissao de energia

    Energy Technology Data Exchange (ETDEWEB)

    Salles Filho, Anirio

    1988-12-01

    An automation methodology for dynamic synthesis of electric power transmission network is presented. The dynamic synthesis problem is formulated by an optimization mathematical model. The use of a Lagrangian Relaxation strategy allows to decompose the dynamic problem in a simpler static subproblems sequence. The developed model goal is to establish options of system expansion that minimize the investments total costs and satisfy the increasing demand in time. The method is tested in transmission networks Brazilian system and the obtained results show the utility of a dynamic synthesis tool to assist in complex task of planing the transmission system expansion.

  19. Maintenance planning for transmission routes with medium voltage overlines - experience within the framework of two pilot projects; Trassenpflegeplanung fuer Mittel- und Hochspannungsfreileitungen - Erfahrungen von zwei Pilotprojekten

    Energy Technology Data Exchange (ETDEWEB)

    Geiges, H. [Ingenieurbuero Geiges, Freiraum- und Landschaftsplanung, Laumersheim (Germany)

    1997-11-03

    On the basis of the `VDEW Orientation Aid for Maintenance Measures in Transmission Routes` two pilot projects were selected in a 110 kV and a 20 kV overhead transmission route. (orig.) [Deutsch] Auf der Grundlage der `VDEW-Orientierungshilfe zu Pflegemassnahmen in Leitungstrassen` wurden Pilotprojekte in einer 110-kV- und in einer 20-kV-Freileitungstrasse im suedlichen Pfaelzerwald ausgewaehlt. (orig.)

  20. Transmission eigenvalues

    Science.gov (United States)

    Cakoni, Fioralba; Haddar, Houssem

    2013-10-01

    In inverse scattering theory, transmission eigenvalues can be seen as the extension of the notion of resonant frequencies for impenetrable objects to the case of penetrable dielectrics. The transmission eigenvalue problem is a relatively late arrival to the spectral theory of partial differential equations. Its first appearance was in 1986 in a paper by Kirsch who was investigating the denseness of far-field patterns for scattering solutions of the Helmholtz equation or, in more modern terminology, the injectivity of the far-field operator [1]. The paper of Kirsch was soon followed by a more systematic study by Colton and Monk in the context of developing the dual space method for solving the inverse scattering problem for acoustic waves in an inhomogeneous medium [2]. In this paper they showed that for a spherically stratified media transmission eigenvalues existed and formed a discrete set. Numerical examples were also given showing that in principle transmission eigenvalues could be determined from the far-field data. This first period of interest in transmission eigenvalues was concluded with papers by Colton et al in 1989 [3] and Rynne and Sleeman in 1991 [4] showing that for an inhomogeneous medium (not necessarily spherically stratified) transmission eigenvalues, if they existed, formed a discrete set. For the next seventeen years transmission eigenvalues were ignored. This was mainly due to the fact that, with the introduction of various sampling methods to determine the shape of an inhomogeneous medium from far-field data, transmission eigenvalues were something to be avoided and hence the fact that transmission eigenvalues formed at most a discrete set was deemed to be sufficient. In addition, questions related to the existence of transmission eigenvalues or the structure of associated eigenvectors were recognized as being particularly difficult due to the nonlinearity of the eigenvalue problem and the special structure of the associated transmission

  1. Quantifying Transmission.

    Science.gov (United States)

    Woolhouse, Mark

    2017-07-01

    Transmissibility is the defining characteristic of infectious diseases. Quantifying transmission matters for understanding infectious disease epidemiology and designing evidence-based disease control programs. Tracing individual transmission events can be achieved by epidemiological investigation coupled with pathogen typing or genome sequencing. Individual infectiousness can be estimated by measuring pathogen loads, but few studies have directly estimated the ability of infected hosts to transmit to uninfected hosts. Individuals' opportunities to transmit infection are dependent on behavioral and other risk factors relevant given the transmission route of the pathogen concerned. Transmission at the population level can be quantified through knowledge of risk factors in the population or phylogeographic analysis of pathogen sequence data. Mathematical model-based approaches require estimation of the per capita transmission rate and basic reproduction number, obtained by fitting models to case data and/or analysis of pathogen sequence data. Heterogeneities in infectiousness, contact behavior, and susceptibility can have substantial effects on the epidemiology of an infectious disease, so estimates of only mean values may be insufficient. For some pathogens, super-shedders (infected individuals who are highly infectious) and super-spreaders (individuals with more opportunities to transmit infection) may be important. Future work on quantifying transmission should involve integrated analyses of multiple data sources.

  2. Transmission positron microscopes

    International Nuclear Information System (INIS)

    Doyama, Masao; Kogure, Yoshiaki; Inoue, Miyoshi; Kurihara, Toshikazu; Yoshiie, Toshimasa; Oshima, Ryuichiro; Matsuya, Miyuki

    2006-01-01

    Immediate and near-future plans for transmission positron microscopes being built at KEK, Tsukuba, Japan, are described. The characteristic feature of this project is remolding a commercial electron microscope to a positron microscope. A point source of electrons kept at a negative high voltage is changed to a point source of positrons kept at a high positive voltage. Positional resolution of transmission microscopes should be theoretically the same as electron microscopes. Positron microscopes utilizing trapping of positrons have always positional ambiguity due to the diffusion of positrons

  3. Force transmissibility versus displacement transmissibility

    Science.gov (United States)

    Lage, Y. E.; Neves, M. M.; Maia, N. M. M.; Tcherniak, D.

    2014-10-01

    It is well-known that when a single-degree-of-freedom (sdof) system is excited by a continuous motion of the foundation, the force transmissibility, relating the force transmitted to the foundation to the applied force, equals the displacement transmissibility. Recent developments in the generalization of the transmissibility to multiple-degree-of-freedom (mdof) systems have shown that similar simple and direct relations between both types of transmissibility do not appear naturally from the definitions, as happens in the sdof case. In this paper, the authors present their studies on the conditions under which it is possible to establish a relation between force transmissibility and displacement transmissibility for mdof systems. As far as the authors are aware, such a relation is not currently found in the literature, which is justified by being based on recent developments in the transmissibility concept for mdof systems. Indeed, it does not appear naturally, but the authors observed that the needed link is present when the displacement transmissibility is obtained between the same coordinates where the applied and reaction forces are considered in the force transmissibility case; this implies that the boundary conditions are not exactly the same and instead follow some rules. This work presents a formal derivation of the explicit relation between the force and displacement transmissibilities for mdof systems, and discusses its potential and limitations. The authors show that it is possible to obtain the displacement transmissibility from measured forces, and the force transmissibility from measured displacements, opening new perspectives, for example, in the identification of applied or transmitted forces. With this novel relation, it becomes possible, for example, to estimate the force transmissibility matrix with the structure off its supports, in free boundary conditions, and without measuring the forces. As far as force identification is concerned, this

  4. National transmission grid study

    Energy Technology Data Exchange (ETDEWEB)

    Abraham, Spencer [USDOE Office of the Secretary of Energy, Washington, DC (United States)

    2003-05-31

    The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE’s Policy Office Electricity Modeling System (POEMS). DOE’s analysis, presented in Section 2, confirms the central role of the nation’s transmission system in lowering costs to consumers through increased trade. More importantly, DOE’s analysis also confirms the results of previous studies, which show that transmission bottlenecks and related transmission system market practices are adding hundreds of millions of dollars to consumers’ electricity bills each year. A more detailed technical overview of the use of POEMS is provided in Appendix A. DOE led an extensive, open, public input process and heard a wide range of comments and recommendations that have all been considered.1 More than 150 participants registered for three public workshops held in Detroit, MI (September 24, 2001); Atlanta, GA (September 26, 2001); and Phoenix, AZ (September 28, 2001).

  5. Data transmission

    National Research Council Canada - National Science Library

    Tugal, Dogan A; Tugal, Osman

    1989-01-01

    This updated second edition provides working answers to today's critical questions about designing and managing all types of data transmission systems and features a new chapter on local area networks (LANs...

  6. Planning for Rift Valley fever virus: use of geographical information systems to estimate the human health threat of white-tailed deer (Odocoileus virginianus-related transmission

    Directory of Open Access Journals (Sweden)

    Sravan Kakani

    2010-11-01

    Full Text Available Rift Valley fever (RVF virus is a mosquito-borne phlebovirus of the Bunyaviridae family that causes frequent outbreaks of severe animal and human disease in sub-Saharan Africa, Egypt and the Arabian Peninsula. Based on its many known competent vectors, its potential for transmission via aerosolization, and its progressive spread from East Africa to neighbouring regions, RVF is considered a high-priority, emerging health threat for humans, livestock and wildlife in all parts of the world. Introduction of West Nile virus to North America has shown the potential for “exotic” viral pathogens to become embedded in local ecological systems. While RVF is known to infect and amplify within domestic livestock, such as taurine cattle, sheep and goats, if RVF virus is accidentally or intentionally introduced into North America, an important unknown factor will be the role of local wildlife in the maintenance or propagation of virus transmission. We examined the potential impact of RVF transmission via white-tailed deer (Odocoileus virginianus in a typical north-eastern United States urban-suburban landscape, where livestock are rare but where these potentially susceptible, ungulate wildlife are highly abundant. Model results, based on overlap of mosquito, human and projected deer densities, indicate that a significant proportion (497/1186 km2, i.e. 42% of the urban and peri-urban landscape could be affected by RVF transmission during the late summer months. Deer population losses, either by intervention for herd reduction or by RVF-related mortality, would substantially reduce these likely transmission zones to 53.1 km2, i.e. by 89%.

  7. Transmission reliability faces future challenges

    International Nuclear Information System (INIS)

    Beaty, W.

    1993-01-01

    The recently published Washington International Energy Group's 1993 Electric Utility Outlook states that nearly one-third (31 percent) of U.S. utility executives expect reliability to decrease in the near future. Electric power system stability is crucial to reliability. Stability analysis determines whether a system will stay intact under normal operating conditions, during minor disturbances such as load fluctuations, and during major disturbances when one or more parts of the system fails. All system elements contribute to reliability or the lack of it. However, this report centers on the transmission segment of the electric system. The North American Electric Reliability Council (NERC) says the transmission systems as planned will be adequate over the next 10 years. However, delays in building new lines and increasing demands for transmission services are serious concerns. Reliability concerns exist in the Mid-Continent Area Power Pool and the Mid-America Interconnected Network regions where transmission facilities have not been allowed to be constructed as planned. Portions of the transmission systems in other regions are loaded at or near their limits. NERC further states that utilities must be allowed to complete planned generation and transmission as scheduled. A reliable supply of electricity also depends on adhering to established operating criteria. Factors that could complicate operations include: More interchange schedules resulting from increased transmission services. Increased line loadings in portions of the transmission systems. Proliferation of non-utility generators

  8. Role of the North Sea power transmission in realising the 2020 renewable energy targets. Planning and permitting challenges: a deliverable from WP 4 regulatory framework

    Energy Technology Data Exchange (ETDEWEB)

    Kielland, Jens Jacob; Ruud, Audun

    2012-07-01

    This study explores and assesses challenges for the European permitting and planning system with regard to grid development in the North Sea. The following question is discussed: What planning and permitting challenges can influence the realization of an offshore grid in the North Sea? This is answered by referring to the political context of the North Sea and the development of an offshore grid therein. We present the main features of the proposed regulation by the European Commission (COM(2011)658) that will, if it is adapted, impact current grid permitting procedures. Further, key supranational planning tools for offshore grid development are accounted for and the proposed EU measures are discussed with reference to relevant studies on planning and permitting procedures of realizing electricity grids. Finally, the report provides the general findings and conclusions. (Author)

  9. Electrical transmission

    Energy Technology Data Exchange (ETDEWEB)

    Sayers, D P

    1960-05-01

    After briefly tracing the history of electricity transmission, trends in high voltage transmission and experiments being conducted on 650 kV are discussed. 5000 miles of the U.K. grid are operated at 132 kV and 1000 at 275 kV, ultimately to provide a super grid at 380 kV. Problems are insulation, radio interference and the cost of underground lines (16 times that of overhead lines). Also considered are the economics of the grid as a means of transporting energy and as a means of spreading the peak load over the power stations in the most efficient manner. Finally, the question of amenities is discussed.

  10. A new integrated planning model for gas compression and transmission through a complex pipeline network; Um novo modelo de planejamento integrado de compressao e escoamento de gas para uma rede complexa

    Energy Technology Data Exchange (ETDEWEB)

    Iamashita, Edson K. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Galaxe, Frederico; Arica, Jose [Universidade Estadual do Norte Fluminense (UENF), Campos dos Goytacases, RJ (Brazil)

    2005-07-01

    The aim of this paper is to show a new approach to solve integrated gas balance planning problems that defines the best compression and transmission strategy for a system with a large number of platforms or compression units that are interlinked with the delivery points through a complex gas pipeline network. For solving the proposed optimization problem is used a genetic meta-heuristic technique, where the fitness function of the algorithm is the Profit function of the gas balance, being considered the incomes and costs besides the pipeline network constraints, representing the compression system and transmission network near to the real operational condition. Newton Raphson's method is used to solve the nonlinear system that represents the calculation of the pressure drop in the gas pipeline network that can contain various cycles. This model could be used for design and optimization of gas pipeline networks, as well as for the gas balance planning of an existent network looking for the profit maximization. (author)

  11. Network development plan 1995

    International Nuclear Information System (INIS)

    Anon.

    1995-11-01

    Network plan 1995 concerns several strategic problems, among others environmental policy of power transmission lines. Possibilities of restructuring aerial cable network are described. The state of the existing systems and plans for new network systems are presented. (EG)

  12. Cultural influences behind cholera transmission in the Far North Region, Republic of Cameroon: a field experience and implications for operational level planning of interventions.

    Science.gov (United States)

    Ngwa, Moise Chi; Young, Alyson; Liang, Song; Blackburn, Jason; Mouhaman, Arabi; Morris, John Glenn

    2017-01-01

    In recent years, the Far North Region of Cameroon has experienced serious and recurrent cholera outbreaks. Yet, understanding of cultural influences on outbreaks and spread remain poorly understood. This qualitative study explored cultural influences on cholera exposure in this region. Interviews and group discussions were conducted in two phases. Phase I involved key informants and phase II included focus group and household discussions. Thematic techniques including word repetition, key-indigenous-terms, and key-words-in-context were used for qualitative data analysis. Key informants attributed cholera etiology to dirt and spread through water ( caneri ) and food (group eating or faire-un-rond ) while group discussions attributed it to a reprimand from god and transmission through the air. Participants suggested that funerals, weddings, open defecation, and mountaintop burial might influence cholera exposure and facilitate its spread. Hospital avoidance and non-adherence with cholera treatment regimens were linked to favorable beliefs about traditional medicine (rural-urban mentality confrontation). Furthermore, a multiplicity of ethnic languages, mistrust of message sources, culture of dependency and sentimental animal husbandry were barriers to the reception of public health messages. Many participants had limited scientific knowledge about cholera etiology and transmission. The cultural practice of mountain burial seemed to explain the high cholera attack rate in the mountainous terrain compared to the floodplains. Cultural factors are likely to play important roles in the exposure to and spread of cholera. Understanding cultural context, individual and community perceptions of risk and disease may help public health agencies in response to outbreak prevention and control.

  13. Transcending Transmission

    DEFF Research Database (Denmark)

    Schoeneborn, Dennis; Trittin, Hannah

    2013-01-01

    Purpose – Extant research on corporate social responsibility (CSR) communication primarily relies on a transmission model of communication that treats organizations and communication as distinct phenomena. This approach has been criticized for neglecting the formative role of communication...... in the emergence of organizations. This paper seeks to propose to reconceptualize CSR communication by drawing on the “communication constitutes organizations” (CCO) perspective. Design/methodology/approach – This is a conceptual paper that explores the implications of switching from an instrumental...... to a constitutive notion of communication. Findings – The study brings forth four main findings: from the CCO view, organizations are constituted by several, partly dissonant, and potentially contradictory communicative practices. From that viewpoint, the potential impact of CSR communication becomes a matter...

  14. Macedonian transmission grid capability and development

    International Nuclear Information System (INIS)

    Naumoski, K.; Achkoska, E.; Paunoski, A.

    2015-01-01

    The main task of the transmission grid is to guarantee evacuation of electricity from production facilities and, at the same time, supply the electricity to all customers, in a secure, reliable and qualitative manner. During the last years, transmission grid goes through the period of fast and important development, as a result of implementation of renewable and new technologies and creation of internal European electricity market. Due to these reasons, capacity of the existing grid needs to be upgraded either with optimization of existing infrastructure or constructing the new transmission projects. Among the various solutions for strengthening the grid, the one with the minimal investment expenses for construction is selected. While planning the national transmission grid, MEPSO planners apply multi-scenarios analyses, in order to handle all uncertainties, particularly in the forecasts on loads, production and exchange of electricity, location and size of the new power plants, hydrological conditions, integration of renewable sources and the evolution of the electricity market. Visions for development of European transmission grid are also considered. Special attention in the development plan is paid to modelling of power systems in the region of South-Eastern Europe and covering a wider area of the regional transmission grid with simulations of various market transactions. Macedonian transmission grid is developed to satisfy all requirements for electricity production/supply and transits, irrespective which scenario will be realized on long-term basis. Transmission development plan gives the road map for grid evolution from short-term and mid-term period towards long-term horizons (15-20 years ahead). While creating long-term visions, a big challenge in front of transmission planners is implementation of NPP. The paper gives overview of the planning process of Macedonian transmission grid,comprising: definition of scenarios,planning methodology and assessment of

  15. Solution of the Transmission Problem

    Czech Academy of Sciences Publication Activity Database

    Medková, Dagmar

    2010-01-01

    Roč. 110, č. 3 (2010), s. 1489-1500 ISSN 0167-8019 Institutional research plan: CEZ:AV0Z10190503 Keywords : Laplace equation * transmission problem * single layer potential * double layer potential Subject RIV: BA - General Mathematics Impact factor: 0.979, year: 2010 http://link.springer.com/article/10.1007%2Fs10440-009-9522-5

  16. Regional Transmission Projects: Finding Solutions

    Energy Technology Data Exchange (ETDEWEB)

    The Keystone Center

    2005-06-15

    The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association

  17. Alternative approaches to transmission investment

    Energy Technology Data Exchange (ETDEWEB)

    Thon, S. [AltaLink Management Ltd., Calgary, AB (Canada)

    2004-07-01

    AltaLink is Canada's first stand-alone power transmission company, serving all major centres in Alberta and 85 per cent of Alberta's population. It has more than $1 billion in assets, 11,500 km of transmission lines and 300 substations. It was noted that there has not been any significant investment in power transmission in Alberta for the past 20 years, partly because transmission assets have a very long lifespan. The new role of the power grid is to ensure reliability, safety, efficiency, market effectiveness and supply diversity. The benefits and costs of AltaLink's 500 kV North-South upgrade project were outlined. It was noted that a healthy transmission system is the basis for economic growth throughout the province and for the development of Alberta's resource base. The transmission policy in Alberta endorses that all consumers pay postage stamp tariffs. It also promotes a proactive plan for transmission projects, the time to maximum rate (TMR) in limited cases only, a congestion-free grid under normal conditions, the financial commitment of generators, specific time limits on permitting processes, and regional interconnections to benefit all customers. tabs., figs.

  18. Available transmission capacity assessment

    Directory of Open Access Journals (Sweden)

    Škokljev Ivan

    2012-01-01

    Full Text Available Effective power system operation requires the analysis of vast amounts of information. Power market activities expose power transmission networks to high-level power transactions that threaten normal, secure operation of the power system. When there are service requests for a specific sink/source pair in a transmission system, the transmission system operator (TSO must allocate the available transfer capacity (ATC. It is common that ATC has a single numerical value. Additionally, the ATC must be calculated for the base case configuration of the system, while generation dispatch and topology remain unchanged during the calculation. Posting ATC on the internet should benefit prospective users by aiding them in formulating their requests. However, a single numerical value of ATC offers little for prospect for analysis, planning, what-if combinations, etc. A symbolic approach to the power flow problem (DC power flow and ATC offers a numerical computation at the very end, whilst the calculation beforehand is performed by using symbols for the general topology of the electrical network. Qualitative analysis of the ATC using only qualitative values, such as increase, decrease or no change, offers some new insights into ATC evaluation, multiple transactions evaluation, value of counter-flows and their impact etc. Symbolic analysis in this paper is performed after the execution of the linear, symbolic DC power flow. As control variables, the mathematical model comprises linear security constraints, ATC, PTDFs and transactions. The aim is to perform an ATC sensitivity study on a five nodes/seven lines transmission network, used for zonal market activities tests. A relatively complicated environment with twenty possible bilateral transactions is observed.

  19. ASSESSMENT OF LONG TRANSMISSION AND DIS SESSMENT ...

    African Journals Online (AJOL)

    eobe

    cost (AIC) methodology and marginal incremental ... ing, distribution planning, power system economics, long run marginal costing .... and distribution); gas transmission, water supply and ..... future decision making on possible investments.

  20. Application of an evolutionary algorithm in the reactive compensation of transmission networks of electrical energy planning; Aplicacion de un algoritmo evolutivo en la planificacion de la compensacion reactiva de redes de transmision de energia electrica

    Energy Technology Data Exchange (ETDEWEB)

    Hernandez Galicia, Julio A.; Nieva Gomez, Rolando [Instituto de Investigaciones Electricas, Temixco, Morelos (Mexico)

    2001-07-01

    In the present work it is considered the mathematical formulation of the problem of the reactive compensation planning, The solution technique based on evolutionary programming is described and the results of compensation in the Northwest subsystem of the Mexican electrical system are shown. A technique of optimization based on the Evolutionary Programming is proposed to solve the problem of the Planning of the Reactive Compensation in transmission of electrical energy networks. The problem consists in determining how much compensation to add and where to locate it in such a way that the investment cost of the compensation equipment is diminished, plus the operation costs associated to the transmission losses, plus a penalty function associated to the violations of the operative limits of voltage. The compensation that is determined must allow that the network operates in normal conditions before any contingency of a pre-established assembly. The problem considered is non-linear and whole compound. Tests made to a representative system of the Northwest area of the Mexican electrical system of 171 nodes and 284 branches are reported. [Spanish] En el presente trabajo se plantea la formulacion matematica del problema de planificacion de la compensacion reactiva, se describe la tecnica de solucion basada en programacion evolutiva y se muestra resultados de compensacion en el subsistema Noroeste del sistema electrico mexicano. Se propone una tecnica de optimizacion basada en la Programacion Evolutiva para resolver el problema de la Planificacion de la Compensacion Reactiva en redes de transmision de energia electrica. El problema consiste en determinar cuanta compensacion agregar y donde ubicarla de tal manera que se minimice el costo de inversion del equipo de compensacion, mas los costos de operacion asociados a las perdidas de transmision, mas una funcion de penalizacion asociada a la violaciones de los limites operativos de voltaje. La compensacion que se determine

  1. Transmission access issues: Present and future

    International Nuclear Information System (INIS)

    Bahl, P.K.; Gray, R.G.

    1992-01-01

    In recent years, the electric industry has undergone dramatic changes as the federal and state governments have encouraged bulk power production by Independent Power Producers (IPPS) and Qualified Facilities (QFs). With decentralization and the consequent competition in the field of bulk power production, there has emerged the problem of non-utility generators (NUGS) and of transmission dependent utilities accessing the existing transmission systems owned by electric utilities. This paper presents current and future issues related to transmission access by IPPS, QFs and transmission dependent utilities. These issues include: (a) impact on system reliability, (b) impact of pricing strategies, (c) changes in state and federal regulations, (d) transmission proposals by various entities, (e) present access arrangements, (f) formation of the Western Systems Power Pool (WSPP), and (g) siting difficulties. The transmission access problem warrants consideration of transmission services, coordination among electric utilities, joint planning on a regional basis, and accommodation of IPPs and NUGs

  2. Transmission policy in the United States

    International Nuclear Information System (INIS)

    Joskow, P.L.

    2005-01-01

    This paper provides an overview of the development of electric power transmission access, pricing and investment policies in the US over the last 15 years and evaluates the current state of those policies. Pre-liberalization transmission access and pricing policies are reviewed first since more recent policies have evolved from them. FERC's efforts to ensure that transmission owning utilities provide non-discriminatory access and pricing to wholesale transmission customers, culminating in Order 888 and 889 are discussed. These rules did not respond to problems created by a highly balkanized transmission system and only partially responded to problems caused by common ownership and operation of transmission networks with generating and marketing businesses in the same regions. These problems motivated FERC to seek to create Regional Transmission Organizations (RTO) meeting a long list of criteria related to governance, network operations, transmission pricing and investment as reflected in Order 2000. The slow pace of 'voluntary' reform following Order 2000 led FERC to issue a proposed Standard Market Design Rule (SMD) which provided more detailed prescriptions for wholesale market design, network operations, regional planning, resource adequacy, and transmission investment. The SMD rule confronted enormous resistance from groups of utilities and states that had not embraced an electricity sector liberalization agenda. However, many of the provisions of the SMD are being implemented by the RTOs and ISOs in the Northeast and Midwest. PJM's market rules and transmission pricing, planning and investment policies are reviewed as an articulation of FERC's RTO and SMD visions. (author)

  3. Evaluating the merchant transmission market

    International Nuclear Information System (INIS)

    Hsieh, E.; Bartholomew Fisher, E.

    2007-01-01

    This paper reviewed the North American bulk electric transmission system, with particular reference to the following merchant power transmission projects that have applied to sell transmission at negotiated rates by the Federal Energy Regulatory Commission (FERC): Cross Sound Cable; Neptune Phase 1; TransCanada's Northern Lights HVDC line; Montana Alberta Tie; Juan de Fuca Cable; Linden VFT; Connecticut-Long Island Cable; Lake Erie Link; Empire Connection; Harbor Cable; Chesapeake Transmission; and the Neptune/Green Line. The projects were sorted by status as either active, inactive and restructured. Each summary included the interconnection points, capacity, and sponsor. This paper also identified the major hurdles in their approvals. The relative success of the merchant transmission framework in attracting new investment was then reviewed. The successful projects shared 3 common attributes. They connected areas with large price differentials and they used advanced flow control technology such as HVDC, PARs, and VFTs. The successful projects also bridged some type of border, either geographic, electrical, economic, or a combination. Three of the active projects crossed the Canadian-US border, while the other 3 connected New York City to neighbouring regions. It was shown that merchant transmission fills a niche, enabling market responses to connect areas that may be overlooked by a regional planning process. 27 refs

  4. 78 FR 63036 - Transmission Planning Reliability Standards

    Science.gov (United States)

    2013-10-23

    ... Reliability Standards for the Bulk Power System, 130 FERC ] 61,200 (2010). \\8\\ Mandatory Reliability Standards... electric system operations across normal and contingency conditions. We also find that Reliability Standard... Reliability Standards for the Bulk Power System, 131 FERC ] 61,231 at P 21. Comments 24. NERC supports the...

  5. 77 FR 26686 - Transmission Planning Reliability Standards

    Science.gov (United States)

    2012-05-07

    ...' stakeholder process including, as discussed below, definition of the process and criteria or guidelines for... review in an open and transparent stakeholder process.'' \\13\\ NERC's proposed footnote `b' states: \\11... stakeholder process that includes addressing stakeholder comments. 7. NERC supplemented the filing on June 7...

  6. 76 FR 66229 - Transmission Planning Reliability Standards

    Science.gov (United States)

    2011-10-26

    ... that definition for review by regulators and other stakeholders, receive comments from regulators and stakeholders requesting a more narrow definition, and explain to the regulators and stakeholders why it is... Demand when ``subject to review in an open and transparent stakeholder process.'' \\16\\ NERC's proposed...

  7. Fundamental study of bulk power HVDC transmission

    International Nuclear Information System (INIS)

    1981-01-01

    Study on the HVDC power transmission have been conducted since 1956. Shinshinano-Frequency Changer had been operated at first on 1977, as our home product, and Hokkaido-Honshu DC transmission also realized at 1979. Research and Development of the bulk power HVDC have been promoted by the UHV transmission special committee in our Institute from 1980. This paper is a comprehensive report published in the parts of operating control, insulation of DC line and countermeasure of fault current, and interferences in order to contribute for planning, design and operating of the UHV DC transmission in future. (author)

  8. Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations

    Energy Technology Data Exchange (ETDEWEB)

    Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

    2011-02-01

    The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

  9. Alternative approaches to transmission investment

    Energy Technology Data Exchange (ETDEWEB)

    Vlahos, P. [Ontario Energy Board, Toronto, ON (Canada)

    2004-07-01

    The current regulatory framework at the Ontario Energy Board (OEB) was outlined with reference to the 10-year outlook of the Independent Electricity Market Operator (IMO). Power transmitters currently respond to the IMO's outlook, while the OEB approves applications and cost recovery in rates. The Working Group on Congestion has recommended that the IMO produce a 10-year resource plan, that transmitters produce a 10-year expansion plan, and that the OEB develop a framework for project assessment and rate relief. The Task Force has concluded that merchant transmission is not proven, that transmission is an essential public infrastructure, and that regulatory responsibilities and approval processes should be clarified and streamlined. It was noted that the OEB's approach to regulation should be consistent, clear, predictable, fair, timely and in the public interest.

  10. Transmission : key to the Alberta market

    International Nuclear Information System (INIS)

    Lyons, D.

    2003-01-01

    AltaLink is Canada's first independent transmission company with 11,000 kilometres (km) of lines and 250 substations. It possesses a unique ownership structure with strong technical partners and financial capability. No major transmission system has been built in the last fifteen years in Alberta. The author examined the situation of power transmission in Alberta, indicating that developments should include capacity increase out of Fort McMurray, and better market integration with both British Columbia and the Pacific Northwest. An efficient and effective market requires ample transmission capacity, which would allow for trade and competition, access for efficient generators, and access to regional markets. New transmission must be planned and achieved in a proactive manner. Generation developers must be assured that transmission will be available, and that tariffs and loss factors will be predictable and stable. figs

  11. Investment in Electricity Transmission and Ancillary Environmental Benefits

    OpenAIRE

    Burtraw, Dallas; Bharvirkar, Ranjit; Bloyd, Cary

    2002-01-01

    Planning of the electricity transmission system generally focuses on the pros and cons of providing generation close to the source of the power demand versus remote generation linked via the transmission system. Recent electricity supply problems in the western United States have renewed interest in the role of transmission in assuring the reliability of electricity supply. Recently, the Western Governors’ Association led the development of a planning exercise that examined the tradeoffs over...

  12. Space power transmission

    Energy Technology Data Exchange (ETDEWEB)

    Kuribayashi, Shizuma [Mitsubishi Heavy Industries, Ltd., Tokyo, (Japan)

    1989-10-05

    There being a conception to utilize solar energy by use of a space power station (SPS), a method to bring that universal grace to mankind is wireless energy transmission. The wireless energy transmission is regarded to be microwave transmission or laser beam transmission. The microwave transmission is to transmit 2.45GHz band microwave from the SPS to a receiving station on the ground to meet power demand on earth. The microwave, as small in attenuation in atmosphere and resistant against rain and cloud, is made candidate and, however, problematic in influence on organism, necessary large area of receiving antenna and many other points to be studied. While the laser transmission, as more convergent of beam than the microwave transmission, is advantageous with enabling the receiving area to be small and, however, disadvantageous with being not resistant against dust, rain and cloud, if used for the energy transmission between the space and earth. 2 refs., 2 figs.

  13. Transmission on Balance 2006

    International Nuclear Information System (INIS)

    2007-02-01

    Every year he Dutch Transmission System Operator (TSO) TenneT issues the title publication 'Transmission on Balance'. This report provides information about the main technical operating results in the past year.

  14. Transmission congestion management in the electricity market

    Science.gov (United States)

    Chen, Yue

    2018-04-01

    In this paper we mainly discuss how to optimize the arrangement to decrease the loss of each line when the power generation side of the system transmission congestion occurs in a safe and economical manner. We respectively set the adjust model if the transmission can be eliminated which can calculate the best scheme and safety margin model when transmission cannot be eliminated which is a multi-objective planning problem. We solve the two models on the condition of the load power demands are 982.4MW and 1052.8 MW by Lingo and get the optimal management scheme.

  15. Transmission policy in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Joskow, P.L. [Massachusetts Institute of Technology, Cambridge, MA (United States). Department of Economics

    2005-06-01

    This paper provides an overview of the development of electric power transmission access, pricing and investment policies in the US over the last 15 years and evaluates the current state of those policies. Pre-liberalization transmission access and pricing policies are reviewed first since more recent policies have evolved from them. FERC's efforts to ensure that transmission owning utilities provide non-discriminatory access and pricing to wholesale transmission customers, culminating in Order 888 and 889 are discussed. These rules did not respond to problems created by a highly balkanized transmission system and only partially responded to problems caused by common ownership and operation of transmission networks with generating and marketing businesses in the same regions. These problems motivated FERC to seek to create Regional Transmission Organizations (RTO) meeting a long list of criteria related to governance, network operations, transmission pricing and investment as reflected in Order 2000. The slow pace of 'voluntary' reform following Order 2000 led FERC to issue a proposed Standard Market Design Rule (SMD) which provided more detailed prescriptions for wholesale market design, network operations, regional planning, resource adequacy, and transmission investment. The SMD rule confronted enormous resistance from groups of utilities and states that had not embraced an electricity sector liberalization agenda. However, many of the provisions of the SMD are being implemented by the RTOs and ISOs in the Northeast and Midwest. PJM's market rules and transmission pricing, planning and investment policies are reviewed as an articulation of FERC's RTO and SMD visions. (author)

  16. The automotive transmission book

    CERN Document Server

    Fischer, Robert; Jürgens, Gunter; Najork, Rolf; Pollak, Burkhard

    2015-01-01

    This book presents essential information on systems and interactions in automotive transmission technology and outlines the methodologies used to analyze and develop transmission concepts and designs. Functions of and interactions between components and subassemblies of transmissions are introduced, providing a basis for designing transmission systems and for determining their potentials and properties in vehicle-specific applications: passenger cars, trucks, buses, tractors, and motorcycles. With these fundamentals the presentation provides universal resources for both state-of-the-art and future transmission technologies, including systems for electric and hybrid electric vehicles.

  17. Internet plan and planning

    Directory of Open Access Journals (Sweden)

    Kahriman Emina

    2008-01-01

    Full Text Available Paper discuss specific features of internet plan as well as planning as management process in general in the contemporary environment. No need to stress out that marketing plan and marketing planning is core activity in approaching to market. At the same time, there are a lot specific c request in preparing marketing plan comparing to business planning due to marketing plan is an essential part. The importance of internet plan and planning rely on specific features of the internet network but as a part of general corporate as well as marketing strategy.

  18. Pellicle transmission uniformity requirements

    Science.gov (United States)

    Brown, Thomas L.; Ito, Kunihiro

    1998-12-01

    Controlling critical dimensions of devices is a constant battle for the photolithography engineer. Current DUV lithographic process exposure latitude is typically 12 to 15% of the total dose. A third of this exposure latitude budget may be used up by a variable related to masking that has not previously received much attention. The emphasis on pellicle transmission has been focused on increasing the average transmission. Much less, attention has been paid to transmission uniformity. This paper explores the total demand on the photospeed latitude budget, the causes of pellicle transmission nonuniformity and examines reasonable expectations for pellicle performance. Modeling is used to examine how the two primary errors in pellicle manufacturing contribute to nonuniformity in transmission. World-class pellicle transmission uniformity standards are discussed and a comparison made between specifications of other components in the photolithographic process. Specifications for other materials or parameters are used as benchmarks to develop a proposed industry standard for pellicle transmission uniformity.

  19. Transmission Integration | Grid Modernization | NREL

    Science.gov (United States)

    Transmission Integration Transmission Integration The goal of NREL's transmission integration integration issues and provide data, analysis, and models to enable the electric power system to more and finding solutions to address them to enable transmission grid integration. Capabilities Power

  20. Series Transmission Line Transformer

    Science.gov (United States)

    Buckles, Robert A.; Booth, Rex; Yen, Boris T.

    2004-06-29

    A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

  1. Drivers of Tuberculosis Transmission.

    Science.gov (United States)

    Mathema, Barun; Andrews, Jason R; Cohen, Ted; Borgdorff, Martien W; Behr, Marcel; Glynn, Judith R; Rustomjee, Roxana; Silk, Benjamin J; Wood, Robin

    2017-11-03

    Measuring tuberculosis transmission is exceedingly difficult, given the remarkable variability in the timing of clinical disease after Mycobacterium tuberculosis infection; incident disease can result from either a recent (ie, weeks to months) or a remote (ie, several years to decades) infection event. Although we cannot identify with certainty the timing and location of tuberculosis transmission for individuals, approaches for estimating the individual probability of recent transmission and for estimating the fraction of tuberculosis cases due to recent transmission in populations have been developed. Data used to estimate the probable burden of recent transmission include tuberculosis case notifications in young children and trends in tuberculin skin test and interferon γ-release assays. More recently, M. tuberculosis whole-genome sequencing has been used to estimate population levels of recent transmission, identify the distribution of specific strains within communities, and decipher chains of transmission among culture-positive tuberculosis cases. The factors that drive the transmission of tuberculosis in communities depend on the burden of prevalent tuberculosis; the ways in which individuals live, work, and interact (eg, congregate settings); and the capacity of healthcare and public health systems to identify and effectively treat individuals with infectious forms of tuberculosis. Here we provide an overview of these factors, describe tools for measurement of ongoing transmission, and highlight knowledge gaps that must be addressed. © The Author 2017. Published by Oxford University Press for the Infectious Diseases Society of America.

  2. Cultural Transmission of Civicness

    DEFF Research Database (Denmark)

    Ljunge, Jan Martin

    2012-01-01

    This paper estimates the intergeneration transmission of civicness by studying second generation immigrants in 29 European countries with ancestry in 83 nations. There is significant transmission of civicness both on the mother’s and the father’s side. The estimates are quantitatively significant...

  3. Cultural Transmission of Civicness

    DEFF Research Database (Denmark)

    Ljunge, Jan Martin

    This paper estimates the intergeneration transmission of civicness by studying second generation immigrants in 29 European countries with ancestry in 83 nations. There is significant transmission of civicness both on the mother’s and the father’s side. The estimates are quantitatively significant...

  4. Poverty and price transmission

    DEFF Research Database (Denmark)

    Elleby, Christian

    A key parameter determining the welfare impact from a world market shock is the transmission elasticity which measures the average domestic response to an international price change. Many studies have estimated price transmission elasticities for a large number of countries but the variation in t...

  5. Transmission market support system

    International Nuclear Information System (INIS)

    Reinschmidt, K.F.; Coles, B.C.

    1995-01-01

    An interactive, computer-based market support system has been developed for transmission access that is efficient, equitable, and fair to all parties concerned with electrical transmission: utilities, electric generators, owners of transmission networks, and wholesale purchasers of electrical power. Each participant transmits electronically to the computer system his proposed price schedule for buying, selling, or transmitting power for each future time period. The price for transmission on a single line in one direction can differ from the price in the other direction. The total quantity offered in the transmission bid represents the capacity of the line, and the flow on the line cannot exceed this value. The system automatically computes the prices that clear the market; that is, the price that each generator receives at each bus, the price that each transmission operator receives on each line, and the price that each customer pays at each bus. The computer system maximizes the benefits to all three classes while satisfying the electrical characteristics of the transmission system by means of load flow calculations. Customers never pay more than their bid prices (but may pay less), and generators and transmission operators never receive less than their bid prices (but may receive more). The price at each bus applies to all buyers and sellers at that bus: all buyers at the same bus pay the same price and all generators at a bus receive the same price

  6. Pricing transmission services

    International Nuclear Information System (INIS)

    Haaden, E.

    1995-01-01

    The price structure for transmission of electric power through the main lines in Sweden is analyzed. After deregulation of the electricity market, the main transmission lines are owned by a separate national company, with no interests from the power producers. Comparisons are made to ideal marginal price structures. 6 refs

  7. Eliminating Perinatal HIV Transmission

    Centers for Disease Control (CDC) Podcasts

    In this podcast, CDC’s Dr. Steve Nesheim discusses perinatal HIV transmission, including the importance of preventing HIV among women, preconception care, and timely HIV testing of the mother. Dr. Nesheim also introduces the revised curriculum Eliminating Perinatal HIV Transmission intended for faculty of OB/GYN and pediatric residents and nurse midwifery students.

  8. First update of the International Xenotransplantation Association consensus statement on conditions for undertaking clinical trials of porcine islet products in type 1 diabetes--Chapter 5: recipient monitoring and response plan for preventing disease transmission.

    Science.gov (United States)

    Denner, Joachim; Tönjes, Ralf R; Takeuchi, Yasu; Fishman, Jay; Scobie, Linda

    2016-01-01

    Xenotransplantation of porcine cells, tissues, and organs may be associated with the transmission of porcine microorganisms to the human recipient. A previous, 2009, version of this consensus statement focused on strategies to prevent transmission of porcine endogenous retroviruses (PERVs). This version addresses potential transmission of all porcine microorganisms including monitoring of the recipient and provides suggested approaches to the monitoring and prevention of disease transmission. Prior analyses assumed that most microorganisms other than the endogenous retroviruses could be eliminated from donor animals under appropriate conditions which have been called "designated pathogen-free" (DPF) source animal production. PERVs integrated as proviruses in the genome of all pigs cannot be eliminated in that manner and represent a unique risk. Certain microorganisms are by nature difficult to eliminate even under DPF conditions; any such clinically relevant microorganisms should be included in pig screening programs. With the use of porcine islets in clinical trials, special consideration has to be given to the presence of microorganisms in the isolated islet tissue to be used and also to the potential use of encapsulation. It is proposed that microorganisms absent in the donor animals by sensitive microbiological examination do not need to be monitored in the transplant recipient; this will reduce costs and screening requirements. Valid detection assays for donor and manufacturing-derived microorganisms must be established. Special consideration is needed to preempt potential unknown pathogens which may pose a risk to the recipient. This statement summarizes the main achievements in the field since 2009 and focus on issues and solutions with microorganisms other than PERV. © 2016 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  9. Electric transmission technology

    International Nuclear Information System (INIS)

    Shah, K.R.

    1990-01-01

    Electric transmission technology has matured and can transmit bulk power more reliably and economically than the technology 10 years ago.In 1882, Marcel Depres transmitted 15 kW electric power at 2 kV, using a constant direct current; present transmission voltages have risen to ± 600 kV direct current (DC) and 765 kV alternating current (AC), and it is now possible to transmit bulk electric power at voltages as high as ± 1000 kV DC and 1500 kV AC. Affordable computer systems are now available to optimize transmission reliably. New materials have reduced the bulk of insulation for lines and equipment. New conducting materials and configurations have reduced losses in transmission. Advances in line structures and conductor motion, understanding of flashover characteristics of insulators and air-gaps and electrical performance of lines have resulted in more compact urban transmission lines. (author). 15 refs., 7 tabs., 11 figs

  10. Microwave energy transmission

    Energy Technology Data Exchange (ETDEWEB)

    Matsumoto, Hiroshi [Kyoto Univ. (Japan)

    1989-03-05

    Laying stress on the technological problems and effect on the environment of microwave energy transmission, recent scientific and engineering problems and related subjects are described. Because no fuel is required for the solar power generation, the power generation system can not be considered as an expensive one when the unit cost of energy is taken into consideration. Some of the important technological problems in the microwave energy transmission are accurate microwave beam control technology to receiving stations and improvement in the efficiency of transmission system. Microwave energy beam has effects on living bodies, communication, and plasma atmosphere of the earth. Microwave energy transmission using a space flyer unit is scheduled. Its objective is the development of microwave wireless transmission technology and the study of the correlation between high power microwave and ionosphere plasma. Experiments on such a small scale application as a microwave driven space ship to bring results seem also important. 12 refs., 13 figs.

  11. Optimum transmission system expansion offshore considering renewable energy sources

    NARCIS (Netherlands)

    Torbaghan, Shahab S.; Gibescu, Madeleine

    2017-01-01

    This chapter provides an overview of transmission expansion planning (TEP) methods and their practical application. First, it discusses the strategic importance of the transmission system. Next, it describes the reasons why TEP remains a challenge for systems with a large share of renewable energy.

  12. Cost characteristics of transmission

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    FERC regulation of transmission is predicated, at least in part, on a belief that, in the absence of regulation, some utilities would be able to exercise monopoly power and the ability to extract monopoly profits. This monopoly power follows from the view that transmission facilities inevitably are a natural monopoly for both economic and social/regulatory reasons. In the first part of this section the authors present the argument that transmission is a natural monopoly. They then consider the impact of this on regulation and the problems that that view creates

  13. Understanding Ebola Virus Transmission

    Directory of Open Access Journals (Sweden)

    Seth Judson

    2015-02-01

    Full Text Available An unprecedented number of Ebola virus infections among healthcare workers and patients have raised questions about our understanding of Ebola virus transmission. Here, we explore different routes of Ebola virus transmission between people, summarizing the known epidemiological and experimental data. From this data, we expose important gaps in Ebola virus research pertinent to outbreak situations. We further propose experiments and methods of data collection that will enable scientists to fill these voids in our knowledge about the transmission of Ebola virus.

  14. EC Transmission Line Risk Identification and Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Bigelow, Tim S [ORNL

    2012-04-01

    The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

  15. Transmissions in vehicles 2010

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    Within the international VDI congress 'Gears in vehicles 2010' of the VDI Wissensforum GmbH (Duesseldorf, Federal Republic of Germany) between 22nd and 23rd June, 2010, in Friedrichshafen (Federal Republic of Germany), the following lectures were held: (1) 8HP70H - The moldhybrid transmission from ZF - Cjallenges and achievements (P. Gutmann); (2) GETRAG boosted range extender - A highly flexible electric powertrain for maximum CO{sub 2} reduction (S. Huepkes); (3) E-Transmission between full-hybrid and E-drive (P. Tenberge); (4) Reducing NO{sub x} and particulate emissions in electrified drivelines (R. Kuberczyk); (5) Simulation aided HEV and EV development: from the component to the whole powertrain (A. Gacometti); (6) Investigations on operating behaviour of the optimized CVT hybrid driveline (B.-R. Hoehn); (7) Customer-oriented dimensioning of electrified drivetrains (M. Eghtessad); (8) Decentralized optimal control strategy for parallel hybrid electric vehicles (A. Frenkel); (9) The new generation 6-speed automatic transmission AF40 (G. Bednarek); (10) Customized mechatronic solutions for integrated transmission control units (M. Wieczorek); (11) The optimal automatic transmission for front-transverse applications - Planetary transmissions or dual clutch transmissions? (G. Gumpoltsberger); (12) The new shift-by-wire gearshift lever for the Audi A8 - Requirements and concept (T. Guttenbergere); (13) The new shift-by-wire gearshift lever for the Audi A8 - Realization (A. Giefer); (14) Fuel-efficient transmissions of the future: Calculation of the efficiency factor for vehicle transmissions (B. Volpert); (15) HT-ACM: A new polymer generation for static and dynamic gearbox sealing solutions (E. Osen); (16) 'Energy efficiency equipped solutions by SKF' for power train applications - A contribution to CO{sub 2} - emission reduction and sustainability (T. Bobke); (17) 6-Ratio planetary shift transmission controlled by 4 external brakes, and design

  16. The paradox of transmission system value

    International Nuclear Information System (INIS)

    Haddad, S.Z.; Feldman, R.D.; Charnetzki, P.

    1995-01-01

    The central importance of utility strategic planning with respect to transmission systems has developed as a result of the passage of the Energy Policy Act and the rapid emergence of the era of open grid access. As a consequence, utilities have had to redefine transmission as being more than a cost center managed with reliability as the principal focus and regulated on a rate of return basis. Transmission must now be managed with a view to protection of customers, where possible, and to revenue maximization, both through pricing strategy and through operations. This shift has been compounded by the pressures being thrust upon utilities by regulators or being fomented by competitors to unbundle transmission and distribution from generation. This paper explores how the value of the transmission system can be viewed from the vantage points of different organizations (utilities, regulators, customers, independent generators, etc.). The paper addresses the uncertain and apparently paradoxical nature of transmission system value as it will be impacted by the possible alternative future structures of the electric power industry. Lastly, this paper suggests the strategic possibilities for utilities that this uncertainty presents

  17. Transmission issues in Alberta

    International Nuclear Information System (INIS)

    Levson, D.

    2002-01-01

    This paper outlined the major issues and concerns facing users of the transmission system in Alberta. They include congestion management issues that make investors uncertain about power generation. It is necessary to know the difference between which transmission price signals will be faced by low cost cogeneration at Fort McMurray and Cold Lake coal-fired generation near Edmonton compared to combined cycle gas generation near Calgary. Import and export policy tariffs are another concern. Most new generation opportunities in Alberta require access to export markets, but transmission facilities for export need policy support and appropriate tariffs. It was noted that the past actions of Alberta's Transmission Administrator and balancing pool may be distorting market signals for ancillary service markets, and that loss studies and calculations need upgrading

  18. Kansas Electric Transmission Lines

    Data.gov (United States)

    Kansas Data Access and Support Center — This data set is a digital representation of the EletcircTransmission lines for the State of Kansas as maintained by the Kansas Corporation Commission. Data is...

  19. ECRH transmission system

    International Nuclear Information System (INIS)

    Tancredi, J.

    1983-01-01

    Hughes, Electron Dynamics Division is developing gyrotrons for ECRH requirements. In the development program, techniques have been evolved for transmission system components. These techniques include over-moded waveguide tapers, high average power windows, and rf water loads for testing

  20. Electric Power Transmission Lines

    Data.gov (United States)

    Department of Homeland Security — Transmission Lines are the system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power...

  1. Airspace: Antarctic Sound Transmission

    OpenAIRE

    Polli, Andrea

    2009-01-01

    This paper investigates how sound transmission can contribute to the public understanding of climate change within the context of the Poles. How have such transmission-based projects developed specifically in the Arctic and Antarctic, and how do these works create alternative pathways in order to help audiences better understand climate change? The author has created the media project Sonic Antarctica from a personal experience of the Antarctic. The work combines soundscape recordings and son...

  2. Offshore Transmission Technology

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-10-15

    The purpose of this document is to give an overview of offshore electricity transmission technologies. In particular this document is concerned with the use of High Voltage Direct Current (HVDC) systems and more specifically with the development of Voltage Source Converter (VSC) technology. This report outlines the current state of the main technology groups required for offshore HVDC transmission as well as giving examples of offshore projects (both current and future). Finally some indications of likely unit costs for HV assets are given.

  3. Eliminating Perinatal HIV Transmission

    Centers for Disease Control (CDC) Podcasts

    2012-11-26

    In this podcast, CDC’s Dr. Steve Nesheim discusses perinatal HIV transmission, including the importance of preventing HIV among women, preconception care, and timely HIV testing of the mother. Dr. Nesheim also introduces the revised curriculum Eliminating Perinatal HIV Transmission intended for faculty of OB/GYN and pediatric residents and nurse midwifery students.  Created: 11/26/2012 by Division of HIV/AIDS Prevention.   Date Released: 11/26/2012.

  4. Optical analog transmission device

    International Nuclear Information System (INIS)

    Ikawa, Shinji.

    1994-01-01

    The present invention concerns a device such as electro-optical conversion elements, optoelectric-electric elements and optical transmission channel, not undergoing deleterious effects on the efficiency of conversion and transmission due to temperature, and aging change. That is, a sine wave superposing means superposes, on a detector signal to be transmitted, a sine-wave signal having a predetermined amplitude and at a frequency lower than that of the detector signal. An optoelectric conversion means converts the electric signal as the signal of the sine-wave signal superposing means into an optical signal and outputs the same to an optical transmitting channel. The optoelectric conversion means converts the transmitted signal to an electric signal. A discriminating means discriminates the electric signal into a detector signal and a sine-wave signal. A calculating means calculates an optical transmitting efficiency of the transmitting channel based on the amplitude of the discriminated sine-wave signal. A processing means compensates an amplitude value of the detector signals discriminated by the discriminating means based on the optical transmission efficiency. As a result, an optical analog transmission device can be attained, which conducts optical transmission at a high accuracy without undergoing the defective effects of the optical transmission efficiency. (I.S.)

  5. Issues affecting the electricity transmission system in Mexico under a competitive integrated model

    Energy Technology Data Exchange (ETDEWEB)

    Avila Rosales, M.A.; Gonzalez Flores, J. [Federal Electricity Commission, Mexico City (Mexico)

    2008-07-01

    The electricity sector in Mexico is undergoing a process of significant structural change. The traditional industry framework has been exposed to new market structures and greater competition, both of which are being introduced by changing regulations regarding who can generate, transmit, distribute and sell electricity. Mexico's power industry is changing to a competitive integrated model. Electricity industry restructuring is partly based on the assumption that transmission systems should be flexible, reliable, and open to all exchanges no matter where the suppliers and consumers of energy are located and who they are. However, neither the existing transmission systems nor its management infrastructure can fully support this open exchange. This paper described the primary issues affecting the transmission system in Mexico under a competitive environment and a transmission expansion planning approach that took the uncertainties associated with the location and size of new generating power stations into consideration in order to produce least-cost and robust transmission plans. The paper described the planning process, including a rigorous analysis of the economics of the resulting transmission plans. Specifically, the paper described the current regulatory framework and supply adequacy as well as current procedures and methodologies for transmission management and expansion planning. The transmission planning methodology was also presented. This included a minimum cost analysis; profit analysis; and least-cost transmission plan. It was concluded that the transmission expansion planning approach stressed that a horizon year viewpoint was important because transmission additions have long-term use. The transmission expansion planning approach, further defined the process of selecting transmission projects as one of comparing and optimizing attributes such as near-term needs; long-term utilization; contribution to overall reliability; and favorable or least

  6. Wireless data signal transmission system

    DEFF Research Database (Denmark)

    2014-01-01

    The present invention relates to a method for providing a radio frequency signal for transmission, a system for providing a radio frequency signal for transmission and a method for wireless data transmission between a transmitter and a receiver.......The present invention relates to a method for providing a radio frequency signal for transmission, a system for providing a radio frequency signal for transmission and a method for wireless data transmission between a transmitter and a receiver....

  7. Electricity transmission arrangements in Great Britain: Time for change?

    International Nuclear Information System (INIS)

    Strbac, Goran; Pollitt, Michael; Konstantinidis, Christos Vasilakos; Konstantelos, Ioannis; Moreno, Rodrigo; Newbery, David; Green, Richard

    2014-01-01

    In Great Britain (GB) and across Europe significant investment in electricity transmission is expected over the coming years as decarbonisation and market integration efforts are intensified. However, there is also significant uncertainty with the amount, location and timing of new generation connection, which in turn will drive the transmission investment needs. Given the absence of efficient market design, we identify three key areas of concern with the current transmission investment arrangements: (i) a mis-aligned incentives framework for transmission investment and operation; (ii) lack of coordination of investment and operation; and (iii) conflicts of interest. We then propose three options for future evolution of transmission regimes, which cover the full spectrum of institutional arrangements with respect to transmission planning and delivery, i.e. how and who plans, owns, builds and operates the transmission system. For each option we present: key characteristics; evolution of the current regimes; the ability of the option to address the concerns; and key strengths and weaknesses. Overall, we conclude in the case of GB (this conclusion could be extended to other European countries) that the most appropriate option would be that of an Independent System Operator (ISO) who would be responsible for planning and operating the transmission system. - Highlights: • We identify three key areas of concern with the current transmission arrangements. • We then propose three options for transmission network planning and delivery. • Key strengths and weaknesses of each above option are identified and studied. • We conclude that the most appropriate option for GB would be that of an ISO

  8. Transmission Lines Loading Enhancement Using ADPSO Approach

    OpenAIRE

    M. Mahdavi; H. Monsef; A. Bagheri

    2010-01-01

    Discrete particle swarm optimization (DPSO) is a powerful stochastic evolutionary algorithm that is used to solve the large-scale, discrete and nonlinear optimization problems. However, it has been observed that standard DPSO algorithm has premature convergence when solving a complex optimization problem like transmission expansion planning (TEP). To resolve this problem an advanced discrete particle swarm optimization (ADPSO) is proposed in this paper. The simulation res...

  9. Facts controllers in power transmission and distribution

    CERN Document Server

    Padiyar, KR

    2007-01-01

    About the Book: The emerging technology of Flexible AC Transmission System (FACTS) enables planning and operation of power systems at minimum costs, without compromising security. This is based on modern high power electronic systems that provide fast controllability to ensure ''flexible'' operation under changing system conditions. This book presents a comprehensive treatment of the subject by discussing the operating principles, mathematical models, control design and issues that affect the applications. The concepts are explained often with illustrative examples and case studies. In partic

  10. Transmission line capital costs

    International Nuclear Information System (INIS)

    Hughes, K.R.; Brown, D.R.

    1995-05-01

    The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy's Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs

  11. ETR transmission systems

    International Nuclear Information System (INIS)

    Metzler, D.

    1983-01-01

    The presentation concentrates on factors associated with transmission systems for reactors and/or reactor relevant devices. For present day mirrors and their upgrades where power levels are in the few hundred kW range, waveguide systems with mode control are preferred. Beyond the early 1990's time frame are the ETR DEMO and reactor devices. These require injected power levels of about 75 MW. If only power oscillators are available at that time, then a MARS like transmission system may be appropriate or possibly a guided wave waveguide

  12. Transmission grid security

    CERN Document Server

    Haarla, Liisa; Hirvonen, Ritva; Labeau, Pierre-Etienne

    2011-01-01

    In response to the growing importance of power system security and reliability, ""Transmission Grid Security"" proposes a systematic and probabilistic approach for transmission grid security analysis. The analysis presented uses probabilistic safety assessment (PSA) and takes into account the power system dynamics after severe faults. In the method shown in this book the power system states (stable, not stable, system breakdown, etc.) are connected with the substation reliability model. In this way it is possible to: estimate the system-wide consequences of grid faults; identify a chain of eve

  13. Transmission policy in Alberta and Bill 50

    International Nuclear Information System (INIS)

    Church, J.; Rosehart, W.; MacCormack, J.

    2009-01-01

    Plans developed by the Alberta Electric System Operator (AESO) have determined that Alberta's electrical transmission system needs to be expanded. However, there are complex issues that must be considered in order to assess the nature and extent of the needed expansion. Various new amendments to the system were proposed in the Alberta government's Bill 50, including the construction of new transmission lines; the installation of a double circuit 500 kV alternating current line between Edmonton and the Gibbons-Redwater region; the construction of a new 240 kV substation in southeast Calgary; and the installation of 2 single circuit 500 kV alternating current lines between Edmonton and Fort McMurray. This study provided a review of the institutional framework instituted by the government's transmission policy and compared the costs and benefits of 2 large capacity high voltage DC (HVDC) transmission lines proposed for the Edmonton-Calgary corridor relative to the various other transmission system amendment suggestions. An evaluation of Alberta's proposed regulatory process under Bill 50 was also conducted. Results of the study indicated that the addition of the HVDC lines is an inefficient response to concerns over adequate supply and reliability. 72 refs., 18 tabs.

  14. Watching Handball Transmissions

    DEFF Research Database (Denmark)

    Frandsen, Kirsten

    2010-01-01

    and competent when mastering the game and in relation to others. The study shows that entertainment concerns both affective involvement and identity formation, as social and cultural meaning seem to be at the root of involvement. Even though both men and women find great joy in the transmissions, their viewing...

  15. Intergenerational Transmission of Volunteering

    NARCIS (Netherlands)

    Bekkers, René

    2007-01-01

    In this article, I investigate the strength of intergenerational transmission of volunteering for non-profit associations in The Netherlands. Data from the Family Survey of the Dutch Population 2000 reveal that there are significant relations between current volunteering and parental volunteering in

  16. Open access to transmission

    International Nuclear Information System (INIS)

    Keith, D.M.

    1996-01-01

    For the past 12 to 15 years, the US electric power and energy industry and its federal regulators have been going through a prolonged exercise leading to opening up the national interconnected transmission grid for all qualified wholesale users to have open and equal access. The debates have been painful in a sense that not all parties - especially some of the transmission system owning utilities - believe that the concept of Open Access is achievable, due to technical constraints on the systems. The present Open Access activity is limited to wholesales transaction under the federal jurisdiction, but several states are either experimenting with or considering retail wheeling. In fact, the FERC - Federal Energy Regulatory Commission - has already expanded its view to embrace retail transmission, if the retail transaction involves the use of the interstate transmission systems which are under FERC's jurisdiction. This paper delves into some of the results of the technical cost and pricing analysis for open access. The statutes and resulting regulations are not addressed herein. (author). 1 fig

  17. Intergenerational transmission of volunteerism

    NARCIS (Netherlands)

    Bekkers, R.H.F.P.

    2007-01-01

    In this article, I investigate the strength of intergenerational transmission of volunteering for non-profit associations in The Netherlands. Data from the Family Survey of the Dutch Population 2000 reveal that there are significant relations between current volunteering and parental volunteering in

  18. Household Transmission of Vibrio cholerae in Bangladesh.

    Directory of Open Access Journals (Sweden)

    Jonathan D Sugimoto

    2014-11-01

    Full Text Available Vibrio cholerae infections cluster in households. This study's objective was to quantify the relative contribution of direct, within-household exposure (for example, via contamination of household food, water, or surfaces to endemic cholera transmission. Quantifying the relative contribution of direct exposure is important for planning effective prevention and control measures.Symptom histories and multiple blood and fecal specimens were prospectively collected from household members of hospital-ascertained cholera cases in Bangladesh from 2001-2006. We estimated the probabilities of cholera transmission through 1 direct exposure within the household and 2 contact with community-based sources of infection. The natural history of cholera infection and covariate effects on transmission were considered. Significant direct transmission (p-value<0.0001 occurred among 1414 members of 364 households. Fecal shedding of O1 El Tor Ogawa was associated with a 4.9% (95% confidence interval: 0.9%-22.8% risk of infection among household contacts through direct exposure during an 11-day infectious period (mean length. The estimated 11-day risk of O1 El Tor Ogawa infection through exposure to community-based sources was 2.5% (0.8%-8.0%. The corresponding estimated risks for O1 El Tor Inaba and O139 infection were 3.7% (0.7%-16.6% and 8.2% (2.1%-27.1% through direct exposure, and 3.4% (1.7%-6.7% and 2.0% (0.5%-7.3% through community-based exposure. Children under 5 years-old were at elevated risk of infection. Limitations of the study may have led to an underestimation of the true risk of cholera infection. For instance, available covariate data may have incompletely characterized levels of pre-existing immunity to cholera infection. Transmission via direct exposure occurring outside of the household was not considered.Direct exposure contributes substantially to endemic transmission of symptomatic cholera in an urban setting. We provide the first estimate of

  19. Unforeseen consequences of dedicated renewable energy transmission: Potential implications for renewable electricity development

    Energy Technology Data Exchange (ETDEWEB)

    Bezdek, Roger

    2010-09-15

    Renewable electricity generation requires expansion of electricity transmission, and the U.S. is planning to build a 'green' transmission lines restricted to renewable electricity. However, local jurisdictions are resisting this unless the transmission serves local constituents and existing power plants. This paper finds that if such transmission is built and local access allowed, then the major beneficiaries may be existing power plants. Their access to added transmission could enable them to sell electric power at rates against which renewables cannot compete. These issues must be addressed if large additions of new transmission lines are to facilitate expansion of renewable electricity generation worldwide.

  20. Transmission Reinforcements in the Central American Regional Power System

    Energy Technology Data Exchange (ETDEWEB)

    Elizondo, Marcelo A.; Vallem, Mallikarjuna R.; Samaan, Nader A.; Makarov, Yuri V.; Vyakaranam, Bharat; Nguyen, Tony B.; Munoz, Christian; Herrera, Ricardo; Midence, Diego; Shpitsberg, Anna

    2016-07-25

    The Central American regional interconnected power system (SER) connects the countries members of the Central American regional electricity market (MER): Guatemala, El Salvador, Honduras, Nicaragua, Costa Rica, and Panama. The SER was a result of a long term regional effort, and was initially conceived to transfer 300 MW between countries. However, the current transfer limits between countries range from 70 MW to 300 MW. Regional entities, like CRIE (Regional Commission of Electrical Interconnection), EOR (Central American Regional System Operator), and CDMER (Board of Directors of the Central American Market) are working on coordinating the national transmission expansion plans with regional transmission planning efforts. This paper presents experience in Central America region to recommend transmission reinforcements to achieve 300 MW transfer capacity between any pair of member countries of the Central American regional electricity market (MER). This paper also provides a methodology for technical analysis and for coordination among the regional and national entities. This methodology is unique for transmission systems of these characteristics.

  1. Mechanisms, Transmissions and Applications

    CERN Document Server

    Corves, Burkhard

    2012-01-01

    The first Workshop on Mechanisms, Transmissions and Applications -- MeTrApp-2011 was organized by the Mechatronics Department at the Mechanical Engineering Faculty, “Politehnica” University of Timisoara, Romania, under the patronage of the IFToMM Technical Committees Linkages and Mechanical Controls and Micromachines. The workshop brought together researchers and students who work in disciplines associated with mechanisms science and offered a great opportunity for scientists from all over the world to present their achievements, exchange innovative ideas and create solid international links, setting the trend for future developments in this important and creative field. The topics treated in this volume are mechanisms and machine design, mechanical transmissions, mechatronic and biomechanic applications, computational and experimental methods, history of mechanism and machine science and teaching methods.

  2. Wireless transmission of power

    International Nuclear Information System (INIS)

    Grotz, T.

    1991-01-01

    This paper reports that it has been proven by researchers that electrical energy can be propagated around the world between the surface of the Earth and the ionosphere at extremely low frequencies in what is known as the Schumann Cavity. Experiments to data have shown that electromagnetic waves with frequencies in the range of 8 Hz, the fundamental Schumann Resonance frequency, propagate with litter attenuation around the planet within the Schumann Cavity. It is the intent of this research to determine if the Schumann Cavity can be resonated, if the power that is delivered to the cavity propagated with very low losses, and if power can be extracted at other locations within the cavity. Experimental data collected and calculations made in recent years support the hypothesis that wireless power transmission is a viable and practical alternative to the present systems of power transmission

  3. Dynamic Strategic Information Transmission

    OpenAIRE

    Mikhail Golosov; Vasiliki Skreta; Aleh Tsyvinski; Andrea Wilson

    2011-01-01

    This paper studies strategic information transmission in a dynamic environment where, each period, a privately informed expert sends a message and a decision maker takes an action. Our main result is that, in contrast to a static environment, full information revelation is possible. The gradual revelation of information and the eventual full revelation is supported by the dynamic rewards and punishments. The construction of a fully revealing equilibrium relies on two key features. The first f...

  4. Operational electricity transmission rates

    International Nuclear Information System (INIS)

    Roggen, M.

    1997-01-01

    In a liberalized electricity market both the consumers and the producers of electricity must pay for the use of the power transmission network. Thus, the net manager has unlimited options to realize efficiency improvements. A neutral and transparent management of the power grid is necessary to avoid disturbance of the market. KEMA Consulting translated abstract ideas and strategic advices to operational concepts in its report 'A framework for the determination of tariffs of the transport in the Dutch electricity sector'

  5. [Mumps vaccine virus transmission].

    Science.gov (United States)

    Otrashevskaia, E V; Kulak, M V; Otrashevskaia, A V; Karpov, I A; Fisenko, E G; Ignat'ev, G M

    2013-01-01

    In this work we report the mumps vaccine virus shedding based on the laboratory confirmed cases of the mumps virus (MuV) infection. The likely epidemiological sources of the transmitted mumps virus were children who were recently vaccinated with the mumps vaccine containing Leningrad-Zagreb or Leningrad-3 MuV. The etiology of the described cases of the horizontal transmission of both mumps vaccine viruses was confirmed by PCR with the sequential restriction analysis.

  6. Small passenger car transmission test; Chevrolet LUV transmission

    Science.gov (United States)

    Bujold, M. P.

    1980-01-01

    A 1978 Chevrolet LUV manual transmission tested per the applicable portions of a passenger car automatic transmission test code (SAE J65lb) which required drive performance, coast performance, and no load test conditions. Under these test conditions, the transmission attained maximum efficiencies in the upper ninety percent range for both drive performance tests and coast performance tests. The major results of this test (torque, speed, and efficiency curves) are presented. Graphs map the complete performance characteristics for the Chevrolet LUV transmission.

  7. Benefits of transmission interconnections

    International Nuclear Information System (INIS)

    Lyons, D.

    2006-01-01

    The benefits of new power transmission interconnections from Alberta were discussed with reference to the challenges and measures needed to move forward. Alberta's electricity system has had a long period of sustained growth in generation and demand and this trend is expected to continue. However, no new interconnections have been built since 1985 because the transmission network has not expanded in consequence with the growth in demand. As such, Alberta remains weakly interconnected with the rest of the western region. The benefits of stronger transmission interconnections include improved reliability, long-term generation capability, hydrothermal synergies, a more competitive market, system efficiencies and fuel diversity. It was noted that the more difficult challenges are not technical. Rather, the difficult challenges lie in finding an appropriate business model that recognizes different market structures. It was emphasized that additional interconnections are worthwhile and will require significant collaboration among market participants and governments. It was concluded that interties enable resource optimization between systems and their benefits far exceed their costs. tabs., figs

  8. Transmission expansion in an oligopoly considering generation investment equilibrium

    DEFF Research Database (Denmark)

    Taheri, S. Saeid; Kazempour, Jalal; Seyedshenava, Seyedjalal

    2017-01-01

    the future generation investment actions. However, in such an oligopolistic market, each producer makes its own strategic generation investment decisions. This motivates the transmission system planner to consider the generation investment decision-making problem of all producers within its TEP model......Transmission expansion planning (TEP) is a sophisticated decision-making problem, especially in an oligopolistic electricity market in which a number of strategic (price-maker) producers compete together. A transmission system planner, who is in charge of making TEP decisions, requires considering....... This paper proposes a tri-level TEP decision-making model to be solved by the transmission system planner, whose objective is to maximize the social welfare of the market minus the expansion costs, and whose constraints are the transmission expansion limits as well as the generation investment equilibrium...

  9. Planning of irradiation

    Energy Technology Data Exchange (ETDEWEB)

    Caha, A; Krystof, V [Vyzkumny Ustav Klinicke a Experimentalni Onkologie, Brno (Czechoslovakia)

    1979-07-01

    The principles are discussed of the planning of irradiation, ie., the use of the various methods of location of a pathological focus and the possibility of semiautomatic transmission of the obtained data on a two-dimensional or spatial model. An efficient equipment is proposed for large irradiation centres which should cooperate with smaller irradiation departments for which also a range of apparatus is proposed. Irradiation planning currently applied at the Research Institute of Clinical and Experimental Oncology in Brno is described. In conclusion, some of the construction principles of semi-automatic operation of radiotherapy departments are discussed.

  10. Gas development plan - Estonia

    International Nuclear Information System (INIS)

    1994-06-01

    The total supply of natural gas to Estonia is provided by the Russian company ''Lentransgas'', a 10 year contract is under negotiation. The gas transmission system is physically a part of the transmission network in the Baltic region which previously operated as an integral part of the USSR gas transmission system. The potential market is too small to justify investment in an alternative pipeline from the North Sea. The general reduction in purchasing power in the former COMECON countries has resulted in a decreased industrial production in Estonia and lead to a steep decline in natural gas consumption in all sectors except households. The Danish firm ''Dansk Olie og Naturgas A/S'' has been requested to assist the Estonian company ''AS Eesti Gaas J.S.C.'' in preparing a gas development plan for Estonia. Phase 1 of this plan aims to provide a detailed description of the status of the existing situation under the headings of gas supply and demand, transmission and distribution, economy and organization. The most important problems related to the current transition of the Estonian gas sector towards operation under market conditions are addressed, focussing on gas supply and market conditions, flow control and metering. The general organization of the gas sector in Estonia is described and possible models for future organization are discussed. Some recommendations are given and areas in need of further investigation are identified. (AB)

  11. Alternative approaches to transmission investment

    Energy Technology Data Exchange (ETDEWEB)

    Welch, J.L. [International Transmission Co., Detroit, MI (United States)

    2004-07-01

    The International Transmission Company (ITC) is an independent power transmission company that owns, operates and maintains the high voltage transmission system in southeastern Michigan. The company's current focus is on investing in the transmission infrastructure to improve reliability, relieve congestion, improve access to generation and reduce energy costs for consumers. There is a need for investment in power transmission. Trends indicate that power transactions are on the rise while transmission investment is lagging because pricing protocols are inadequate and there is no regional tariff mechanism to allocate the benefits of new investment. The presentation reviewed the applicability of FTRs to transmission owners and the pitfalls of participant funding pricing. It also outlined the regional benefit allocation mechanism (RBAM) with an illustrative example. It was concluded that existing pricing policies must be improved to address the growing need for transmission investment. RBAM is needed to help investors recover costs from project beneficiaries. figs.

  12. Annual plan, December 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    This annual plan is being provided as required under Section 'D' of the Alberta Energy and Utilities Board Information Letter IL 90-8. The objective is to provide the Board, NOVA Gas Transmission (NGTL) customers and other interested parties with a comprehensive overview of NOVA Gas Transmission's pipeline system expansion plans for the gas year 2000/ 2001, and the winter season of the 2001/2002 gas year. The plan includes descriptions of NGTL's design assumptions and criteria, as well as long term outlook for field deliverability, productive capability, gas deliveries, proposed facility additions, capital expenditures, revenue requirements and firm service demand rates. Major factors affecting the facility requirements for the period under consideration are a decrease in the maximum day delivery volume at the Empress border point, an increase in intra-Alberta maximum day delivery volumes and associated decline in productive capability. Chapter One of the Plan describes the the Annual Plan process itself; Chapter Two is devoted to a discussion of facilities design methodology; Chapter Three deals with economic assumptions; Chapter Four describes design flow, while Chapters Five and Six outline the mainline , meter stations, laterals, and lateral loops facility requirements. Chapter Seven provides and overview of the capital and financial forecasts. tabs., figs.

  13. Our views on transmission policy

    International Nuclear Information System (INIS)

    Wellford, W.H.; Sutley, N.H.

    1990-01-01

    In this article the authors discuss the need for predictable and fair access to transmission facilities in order to ensure competitive generation of power. They propose that the Federal Energy Regulatory Commission should regulate transmission to prevent a utility from gaining a competitive advantage in electricity generation markets, the incorporation of transmission access into every bidding program under state jurisdiction, and requirement of transmission rates, terms and conditions for all in-state utilities be included in the request for proposal

  14. Environmental concerns regarding electric power transmission in North America

    International Nuclear Information System (INIS)

    DeCicco, J.M.; Bernow, S.S.; Beyea, J.

    1992-01-01

    The electric utilities of North America have become ever more interconnected via transmission facilities, largely to insure reliability. Current policy discussions regarding transmission include calls for improved access, increased capacity, and deregulation to facilitate trade in electric power. From an environmental perspective, two issues have been notably absent in much of the debate: (1) a recognition of the full range of environmental impacts related to electricity transmission; and (2) the potential for end-use efficiency to address the reliability and economy requirements that motivate attention to transmission. This paper broaches these issues, starting with an elaboration of the environmental impacts, which range from global and regional effects to local concerns, including the potential health risks associated with electric and magnetic fields. We emphasize that transmission planning should occur as part of an integrated planning process, in which the environmental and social costs of various options are fully considered. We discuss the potential for end-use efficiency to lessen environmental impacts of both transmission and generation. We conclude that there is a need to ensure that environmental externalities and demand-side alternatives are adequately considered when transmission network expansions are proposed. (Author)

  15. Parallel plate transmission line transformer

    NARCIS (Netherlands)

    Voeten, S.J.; Brussaard, G.J.H.; Pemen, A.J.M.

    2011-01-01

    A Transmission Line Transformer (TLT) can be used to transform high-voltage nanosecond pulses. These transformers rely on the fact that the length of the pulse is shorter than the transmission lines used. This allows connecting the transmission lines in parallel at the input and in series at the

  16. Plan well, plan often

    Science.gov (United States)

    Bill Block

    2013-01-01

    This issue includes an invited paper by Courtney Schultz and her colleagues commenting on the application of the newly adopted U.S. Forest Service Planning Rule (hereafter, the rule) for wildlife. The rule is basically implementing language to interpret the spirit and intent of the National Forest Management Act (NFMA) of 1976. Laws such as NFMA require additional...

  17. Language Planning: Corpus Planning.

    Science.gov (United States)

    Baldauf, Richard B., Jr.

    1989-01-01

    Focuses on the historical and sociolinguistic studies that illuminate corpus planning processes. These processes are broken down and discussed under two categories: those related to the establishment of norms, referred to as codification, and those related to the extension of the linguistic functions of language, referred to as elaboration. (60…

  18. Planetary Transmission Diagnostics

    Science.gov (United States)

    Lewicki, David G. (Technical Monitor); Samuel, Paul D.; Conroy, Joseph K.; Pines, Darryll J.

    2004-01-01

    This report presents a methodology for detecting and diagnosing gear faults in the planetary stage of a helicopter transmission. This diagnostic technique is based on the constrained adaptive lifting algorithm. The lifting scheme, developed by Wim Sweldens of Bell Labs, is a time domain, prediction-error realization of the wavelet transform that allows for greater flexibility in the construction of wavelet bases. Classic lifting analyzes a given signal using wavelets derived from a single fundamental basis function. A number of researchers have proposed techniques for adding adaptivity to the lifting scheme, allowing the transform to choose from a set of fundamental bases the basis that best fits the signal. This characteristic is desirable for gear diagnostics as it allows the technique to tailor itself to a specific transmission by selecting a set of wavelets that best represent vibration signals obtained while the gearbox is operating under healthy-state conditions. However, constraints on certain basis characteristics are necessary to enhance the detection of local wave-form changes caused by certain types of gear damage. The proposed methodology analyzes individual tooth-mesh waveforms from a healthy-state gearbox vibration signal that was generated using the vibration separation (synchronous signal-averaging) algorithm. Each waveform is separated into analysis domains using zeros of its slope and curvature. The bases selected in each analysis domain are chosen to minimize the prediction error, and constrained to have the same-sign local slope and curvature as the original signal. The resulting set of bases is used to analyze future-state vibration signals and the lifting prediction error is inspected. The constraints allow the transform to effectively adapt to global amplitude changes, yielding small prediction errors. However, local wave-form changes associated with certain types of gear damage are poorly adapted, causing a significant change in the

  19. Design of a transmission electron positron microscope

    International Nuclear Information System (INIS)

    Doyama, Masao; Inoue, M.; Kogure, Y.; Hayashi, Y.; Yoshii, T.; Kurihara, T.; Tsuno, K.

    2003-01-01

    This paper reports the plans and design of positron-electron microscopes being built at KEK (High Energy Accelerator Research Organization), Tsukuba, Japan. A used electron microscope is altered. The kinetic energies of positrons produced by accelerators or by nuclear decays are not a unique value but show a spread over in a wide range. Positron beam is guided to a transmission electron microscope (JEM100SX). Positrons are moderated by a tungsten foil, are accelerated and are focused on a nickel sheet. The monochromatic focused beam is injected into an electron microscope. The focusing and aberration of positrons are the same as electrons in a magnetic system which are used in commercial electron microscopes. Imaging plates are used to record positron images for the transmission electron microscope. (author)

  20. New transmission interconnection reduces consumer costs

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2008-09-15

    The Central American electric interconnection system (SIEPAC) project will involve the construction of a 1830 km 230 kV transmission system that will link Guatemala, El Salvador, Honduras, Costa Rica, Nicaragua, and Panama. The system is expected to alleviate the region's power shortages and reduce electricity costs for consumers. Costs for the SIEPAC project have been estimated at $370 million. The system will serve approximately 37 million customers, and will include 15 substations. The contract for building the electrical equipment has been awarded to Schweitzer Engineering Laboratories (SEL) who plan to manufacture components at a plant in Mexico. The equipment will include high speed line protection, automation, and control systems. Line current differential systems and satellite-synchronized clocks will also be used. The new transmission system is expected to be fully operational by 2009. 1 fig.

  1. Coaxial transmission line - Equalization

    International Nuclear Information System (INIS)

    Bonnerue, J.L.; Fremont, Jacques; Haubtmann, Jack; Pillon, Gerard.

    1981-09-01

    The transmission of electrical signal through a coaxial line is not perfect and signal distortions are increased as much as the frequency spectrum is extended. We have designed and achieved passive filters (named equalizers) with transfer functions which are inverse of coaxial transfer functions. Doing so our attempt is to avoid definitive loss of information in the recorded data. The main feature of our equalization method lies in the fact it could be either an electrical or a numerical correction or both of them. Some examples in the use of this technique are also proposed [fr

  2. Dynamically prioritized progressive transmission

    Science.gov (United States)

    Blanford, Ronald

    1992-04-01

    Retrieval of image data from a centralized database may be subject to bandwidth limitations, whether due to a low-bandwidth communications link or to contention from simultaneous accesses over a high-bandwidth link. Progressive transmission can alleviate this problem by encoding image data so that any prefix of the data stream approximates the complete image at a coarse level of resolution. The longer the prefix, the finer the resolution. In many cases, as little at 1 percent of the image data may be sufficient to decide whether to discard the image, to permit the retrieval to continue, or to restrict retrieval to a subsection of the image. Our approach treats resolution not as a fixed attribute of the image, but rather as a resource which may be allocated to portions of the image at the direction of a user-specified priority function. The default priority function minimizes error by allocating more resolution to regions of high variance. The user may also point to regions of interest requesting priority transmission. More advanced target recognition strategies may be incorporated at the user's discretion. Multispectral imagery is supported. The user engineering implications are profounded. There is immediate response to a query that might otherwise take minutes to complete. The data is transmitted in small increments so that no single user dominates the communications bandwidth. The user-directed improvement means that bandwidth is focused on interesting information. The user may continue working with the first coarse approximations while further image data is still arriving. The algorithm has been implemented in C on Sun, Silicon Graphics, and NeXT workstations, and in Lisp on a Symbolics. Transmission speeds reach as high as 60,000 baud using a Sparc or 68040 processor when storing data to memory; somewhat less if also updating a graphical display. The memory requirements are roughly five bytes per image pixel. Both computational and memory costs may be reduced

  3. Research and Transmission

    Directory of Open Access Journals (Sweden)

    Denise Pumain

    2001-01-01

    Full Text Available The present situation provides a challenge for us to reconsider the necessary link between science and pedagogy, between research and the transmission of knowledge. The Ministry of National education has just inaugurated a broad consultation of teachers on every level with a view to modernising and giving coherence to the programs of secondary education. Armand Frémont will head the group of experts responsible for history and geography. Is this a coincidence? The changeover in the jury for t...

  4. Strategic Teleconference Planning in Rural Health Education.

    Science.gov (United States)

    Nagel, Liza; Boswell, Judy

    1997-01-01

    An introduction to planning interactive health education teleconferences via satellite discusses participant recruitment, satellite transmission coordination, scheduling considerations, format design, and use of site facilitators. Teleconference training of community service providers and community leaders should combine passive delivery of…

  5. Economy of electric power transmission

    International Nuclear Information System (INIS)

    Manzoni, G.; Delfanti, M.

    2008-01-01

    An analysis is presented of the impact of H V and Ehv transmission costs on the final value of the kWh supplied, with reference both to transmission systems of the European type and to long distance point-to-point transmission links. The analysis is extended to A C transmission by underground cables and to Hvdc submarine and aerial links. In the European power system, the impact of transmission costs results to be usually modest, but it may become important in the case of network congestions [it

  6. Decennial plan of expansion 1994-2003

    International Nuclear Information System (INIS)

    1993-12-01

    The Decennial Plan of Expansion 1994-2003 of Electric sector reproduces the results of the studies occurred during the planning cycle of 1992/93 from the Coordinator Groups of the Electric System Planning. Based in the market forecasting, economic-financier and time for finishing the the works, the Decennial Plan of Expansion presents the schedule of the main generation and transmission works for the next ten years, the annual spend in generation, transmission and distribution, the costs of expansion and the evaluation of attending conditions in electric system in Brazil. (C.G.C.)

  7. Transmission expansion in Argentina 4: A review of performance

    International Nuclear Information System (INIS)

    Littlechild, Stephen C.; Skerk, Carlos J.

    2008-01-01

    In 1992 Argentina's electricity reform provided an innovative approach to transmission expansion. In particular, major expansions were determined by the Public Contest method - that is, by votes of transmission users rather than by the transmission company or the regulatory body - and then put out to competitive tender. This paper reviews the overall performance of that policy. There was substantial new transmission investment, especially in control systems and transformers rather than extra-high-voltage lines: an achievement of the policy lies in making better use of the existing transmission system. The number and value of Public Contest transmission expansion projects were steadily growing over time until Argentina's economic crisis, particularly at sub-transmission level. Transactions costs were not a problem in the Public Contest method: the median number of voters was 5, and the process was generally characterised by harmony between participants rather than by discord. Distribution companies supported rather than obstructed the process, though there was scope to improve the provincial regulatory framework. There was effective competition to build and operate the expansions, with a median of 3 bids for each and the incumbent winning less than one fifth. Such competition roughly halved the cost of new lines. This contrasts with lines built under the present Federal Transmission Plan at two and a half times the previous cost

  8. Transmission economic expansion and congestion relief : a case study

    Energy Technology Data Exchange (ETDEWEB)

    Chao, H.; Trinh, L.H.; Moore, M. [ABB Consulting, Raleigh, NC (United States); Brown, L.; Patel, K. [SDG and E, San Diego, CA (United States)

    2006-07-01

    Transmission capacity additions have lagged behind load growth and generation expansion in the United States. This paper provided an economic analysis of various transmission upgrade options designed to address anticipated congestion of the electricity grid. A market-based transmission planning method was used to assess the economics of transmission expansion. The analysis accounted for the minimum costs of generation dispatch to satisfy transmission constraints, as well as a locational marginal price for each bus in the system. Marginal congestion costs for all major transmission facilities were monitored and recorded. Hourly simulations of load, generation, and transmission system interactions were conducted. Contract costs and economic measures were then calculated for each scenario run. A case study for the Sunrise Powerlink project was used to demonstrate the efficacy of the method. The study demonstrated that the Sunrise Powerlink project will eliminate significant congestion in California load centers. Results also showed that the analytical method provided critical information for decision-makers in weighing the costs with benefits for transmission projects. 5 refs., 2 tabs., 1 fig.

  9. Small passenger car transmission test-Chevrolet 200 transmission

    Science.gov (United States)

    Bujold, M. P.

    1980-01-01

    The small passenger car transmission was tested to supply electric vehicle manufacturers with technical information regarding the performance of commerically available transmissions which would enable them to design a more energy efficient vehicle. With this information the manufacturers could estimate vehicle driving range as well as speed and torque requirements for specific road load performance characteristics. A 1979 Chevrolet Model 200 automatic transmission was tested per a passenger car automatic transmission test code (SAE J651b) which required drive performance, coast performance, and no load test conditions. The transmission attained maximum efficiencies in the mid-eighty percent range for both drive performance tests and coast performance tests. Torque, speed and efficiency curves map the complete performance characteristics for Chevrolet Model 200 transmission.

  10. Transmission rights and market power

    International Nuclear Information System (INIS)

    Bushnell, J.

    1999-01-01

    Most of the concerns about physical transmission rights relate to the ability to implicitly or explicitly remove that transmission capacity from the market-place. Under a very strict form of physical right, owners could simply choose not to sell it if they don't want to use it. Modifications that require the release of spare capacity back into an open market could potentially alleviate this problem but there is concern that such releases would not occur far enough in advance to be of much use to schedulers. Similarly, the transmission capacity that is made available for use by non-rights holders can also be manipulated by the owners of transmission rights. The alternative form, financial transmission rights, provide to their owners congestion payments, but physical control of transmission paths. In electricity markets such as California's, even financial transmission rights could potentially be utilized to effectively withhold transmission capacity from the marketplace. However, methods for withholding transmission capacity are somewhat more convoluted, and probably more difficult, for owners of financial rights than for owners of physical rights. In this article, the author discusses some of the potential concerns over transmission rights and their use for the exercise of various forms of market power

  11. Stress transmission in soil

    DEFF Research Database (Denmark)

    Lamandé, Mathieu; Schjønning, Per

    We urgently need increased quantitative knowledge on stress transmission in real soils loaded with agricultural machinery. 3D measurements of vertical stresses under tracked wheels were performed in situ in a Stagnic Luvisol (clay content 20 %) continuously cropped with small grain cereals......). Seven load cells were inserted horizontally from a pit with minimal disturbance of soil in each of three depths (0.3, 0.6 and 0.9 m), covering the width of the wheeled area. The position of the wheel relative to the transducers was recorded using a laser sensor. Finally, the vertical stresses near...... the soil-tyre interface were measured in separate tests by 17 stress transducers across the width of the tyres. The results showed that the inflation pressure controlled the level of maximum stresses at 0.3 m depth, while the wheel load was correlated to the measured stresses at 0.9 m depth. This supports...

  12. Information transmission strategy

    International Nuclear Information System (INIS)

    Moreau, A.

    1989-01-01

    The four propositions on which our radiation protection information transmission strategy is based are as follows: 1. Emotion exists. It rules our lives at work as well as at home, particularly when radiation safety is involved. Emotion is therefore the terrain for our strategy. 2. The basic emotion is that of fear. This must be recognized and accepted if we want to transmit objective information. The basis of our strategy is therefore listening. 3. A person cannot be divided into parts. The whole person is concerned about safety. We have to deal with that whole person. 4. To follow a strategy we need strategists. We must look at our own emotions and our own motivation before going into the field

  13. Underground transmission tomography

    International Nuclear Information System (INIS)

    Geibka, C.

    1990-01-01

    Several underground tomographic transmission surveys have been carried out. Targets were cavities, ore veins and fault zones. Examples from measurements in a german heavy/fluor spar mine a lead/zinc mine and a rock laboratory of the Swiss National Cooperative for the Storage of Radioactive waste are presented. Measurements were carried out between boreholes and road ways. The recording equipment was the intrinsically safe SEAMEX85 system built and sold by WBK. Receivers were mounted in a chain of 6 two-component probes. Sources were an inhole hammer a sledge hammer a sparker and explosives from a single detonator to 180 g depending on the distance and absorption of the rock material. Cavities showed very distinct velocity reductions between 30 and 50%. Different vein material showed velocity reduction as well as velocity increase relative to the surrounding rock

  14. Transmission in Optically Transparent Core Networks

    Science.gov (United States)

    Kilper, Dan; Jensen, Rich; Petermann, Klaus; Karasek, Miroslav

    2007-03-01

    topics suitable for inclusion in this feature issue are: Optically transparent system design issues, transmission experiments, and field trials Optically transparent network architectures and topologies Dispersion management in reconfigurable and mesh systems Optically transparent network device and sub-system performance, design, characterization and control, including: amplifiers, transmitters, receivers, switches, add/drop multiplexers Transient and fault management Physical layer system control Monitoring and compensation to support transparency Wavelength routing and planning as they relate to physical layer transmission Hardware cost and configuration optimization for optically transparent networks To submit to this special issue, follow the normal procedure for submission to JON and select "TTCN" in the features indicator of the online submission form. For all other questions relating to this feature issue, please send an e-mail to jon@osa.org, subject line "TTCN." Additional information can be found on the JON website: . Submission Deadline: 15 June 2007

  15. ATLAS Phase-II upgrade pixel data transmission development

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00111400; The ATLAS collaboration

    2017-01-01

    The current tracking system of the ATLAS experiment will be replaced by an all-silicon detector (ITk) in the course of the planned HL-LHC accelerator upgrade around 2025. The readout of the ITk pixel system will be most challenging in terms of data rate and readout speed. Simulation of the on-detector electronics indicates that the planned trigger rate of 1 MHz will require readout speeds up to 5.12 Gb/s per data link. The high-radiation environment precludes optical data transmission, so the first part of the data transmission has to be implemented electrically, over a 6-m distance between the pixel modules and the optical transceivers. Several high-speed electrical data transmission solutions involving small-gauge wire cables or flexible circuits have been prototyped and characterized. A combination of carefully-selected physical layers and aggressive signal conditioning are required to achieve the proposed specifications.

  16. 77 FR 69754 - Promoting Transmission Investment Through Pricing Reform

    Science.gov (United States)

    2012-11-21

    ... and size of a project, factors like various federal and state siting approvals introduce a significant... upon to include or retain the project in a regional transmission planning process.\\39\\ \\39\\ If factors... requires significant acceleration of a project construction timeline). 30. The Southwest Power Pool...

  17. Terahertz transmission of NbN superconductor thin film

    Czech Academy of Sciences Publication Activity Database

    Tesař, Roman; Koláček, Jan; Šimša, Zdeněk; Šindler, Michal; Skrbek, L.; Il'in, K.; Sieger, M.

    2010-01-01

    Roč. 470, č. 19 (2010), s. 932-934 ISSN 0921-4534 R&D Projects: GA ČR GA202/08/0326 Institutional research plan: CEZ:AV0Z10100521 Keywords : far- infrared transmission * NbN * superconducting film * magnetic vortices * terahertz waves Subject RIV: BM - Solid Matter Physics ; Magnetism Impact factor: 1.407, year: 2010

  18. Factors affecting the transmission of human onchocerciasis by ...

    African Journals Online (AJOL)

    The findings in this study, if corroborated with those of related studies based on parasitologic, ophthalmologic and socioeconomic monitoring will be useful for planning of effective treatments with ivermectin. Keywords: transmission, human onchocerciasis, savannah, Cross River State Mary Slessor Journal of Medicine Vol.

  19. PYRAMID LAKE RENEWEABLE ENERGY PLAN

    Energy Technology Data Exchange (ETDEWEB)

    HIGH DESERT GEOCULTURE, LLC

    2009-06-06

    The Pyramid Lake Renewable Energy Plan covers these areas: energy potential (primarily focusing on geothermal resource potential, but also more generally addressing wind energy potential); renewable energy market potential; transmission system development; geothermal direct use potential; and business structures to accomplish the development objectives of the Pyramid Lake Paiute Tribe.

  20. 76 FR 58716 - Interpretation of Transmission Planning Reliability Standard

    Science.gov (United States)

    2011-09-22

    ..., Western Public Agencies Group, Western Montana Electric G&T Cooperative, Inc., Oregon Municipal Electric... Enforcement of Electric Reliability Standards, Order No. 672, FERC Stats. & Regs. ] 31,204, order on reh'g... FERC ] 61,062, order on reh'g & compliance, 117 FERC ] 61,126 (2006), aff'd sub nom. Alcoa, Inc. v...

  1. Classification of the visual landscape for transmission planning

    Science.gov (United States)

    Curtis Miller; Nargis Jetha; Rod MacDonald

    1979-01-01

    The Visual Landscape Type Classification method of the Route and Site Selection Division, Ontario Hydro, defines and delineates the landscape into discrete visual units using parametric and judgmental data. This qualitative and quantitative information is documented in a prescribed format to give each of the approximately 1100 Landscape Types a unique description....

  2. Can slide positivity rates predict malaria transmission?

    Directory of Open Access Journals (Sweden)

    Bi Yan

    2012-04-01

    Full Text Available Abstract Background Malaria is a significant threat to population health in the border areas of Yunnan Province, China. How to accurately measure malaria transmission is an important issue. This study aimed to examine the role of slide positivity rates (SPR in malaria transmission in Mengla County, Yunnan Province, China. Methods Data on annual malaria cases, SPR and socio-economic factors for the period of 1993 to 2008 were obtained from the Center for Disease Control and Prevention (CDC and the Bureau of Statistics, Mengla, China. Multiple linear regression models were conducted to evaluate the relationship between socio-ecologic factors and malaria incidence. Results The results show that SPR was significantly positively associated with the malaria incidence rates. The SPR (β = 1.244, p = 0.000 alone and combination (SPR, β = 1.326, p  Conclusion SPR is a strong predictor of malaria transmission, and can be used to improve the planning and implementation of malaria elimination programmes in Mengla and other similar locations. SPR might also be a useful indicator of malaria early warning systems in China.

  3. Creating a robust and integrated electrical transmission system

    International Nuclear Information System (INIS)

    McLain, S.

    2004-01-01

    The service territory for Puget Sound Energy (PSE) was presented in terms of electric power and gas transmission. Issues affecting the Puget Sound area include high growth and the west coast energy crisis which has had an adverse financial impact on the power industry. The transmission system is basically at capacity and has been impacted by imports and exports between the United States and Canada. Other issues include the separation between energy resources and transmission, modernizing the power grid, and challenges for independent power producers (IPPs). The Northwest Transmission Assessment Committee (NTAC), which was formed under the Northwest Power Pool, has the potential to bring interested parties to study constrained paths and to plan a single utility concept for the region. It is expected that new challenges such as financing and risk management will emerge once the technical solutions are identified and agreed upon. The issue of enforceable and mandatory reliability standards was also discussed. 1 fig

  4. Transmission service charges: cost allocation and rate design

    International Nuclear Information System (INIS)

    Poray, A. T.

    2000-01-01

    The application of the Ontario Hydro Networks Company (OHNC) to the Ontario Energy Board to seek approval for cost allocation and rate design methodology to recover revenue requirements for the provision of transmission services in Ontario are summarized. Insights that led to the arguments made in support of the application are also described. The paper contains an overview of plans for the operation of the transmission system, the agreement between Ontario Hydro Services Company (OHSC) and the Independent Market Operator (IMO), the stakeholder consultation process by OHNC to develop the transmission cost allocation and rate design methodology, a discussion of the major rate design issues, a summary of stakeholder opinions and a summary of OHNC's final proposal for transmission pricing. Public hearings on the OHNC application were held between February 16 and March 20, 2000. Final decision by the OEB is expected sometime in May 2000

  5. Transmission investment problems in Europe: Going beyond standard solutions

    International Nuclear Information System (INIS)

    Buijs, Patrik; Bekaert, David; Cole, Stijn; Van Hertem, Dirk; Belmans, Ronnie

    2011-01-01

    The European transmission grid is facing an investment challenge. There is a strong call for more transmission capacity. At the same time, the investment climate is fierce and troubled by public opposition, a complex regulatory framework, etc. Many transmission capacity expansion projects are delayed or canceled. In this paper different technology options suitable for increasing transmission capacity are discussed. The aim is to provide policy-makers with information on technologies without going too much into technical details. The focus is on opportunities and limitations to implement various technological alternatives in practice, including technical solutions that go beyond constructing new connection lines. The criteria used in this technology assessment are based on the obstacles reported in the European Priority Interconnection Plan. This ensures a realistic approach based on problems encountered in real projects. Although AC overhead lines (OHL) will remain the standard solution for grid expansion, it is argued that different technology options can overcome many obstacles that OHL face. Additionally, it is illustrated that the higher investment costs for some solutions can be offset with an increased benefit, e.g. by accomplishing investments with smaller delays due to fewer obstacles encountered. - Research highlights: → Assessment of real problems encountered in transmission investments. → Comparison of transmission technologies. → Techno-economic evaluation of transmission technologies.

  6. Transmission pricing and expansion methodology: lessons from Argentina

    International Nuclear Information System (INIS)

    Anderson, K.P.; McCarthy, A.

    1999-01-01

    This paper focuses on the pricing of electric transmission service in Argentina and on the mechanisms for expanding the transmission system as of late 1998. We also discuss the pricing of energy and generating capacity, since locational differences in their prices constitute charges for transmission service. We find that the methods in place for pricing transmission service are, in the main, consistent with the principles of efficient pricing but that the incentives and mechanisms established for expanding transmission are deficient in some respects. Most notable is the failure to provide for transmission rights, given the system's heavy reliance on user-driven expansion. We find that Argentina can improve upon its pioneering effort to implement user-driven expansion and indeed is exploring ways to do so. The most important tasks are to investigate (a) whether a system of financial transmission rights can be made to work as part of the process of user-driven expansion and (b) whether a backstop role for centrally planned expansion can be preserved without inhibiting or preempting the user-driven process. (author)

  7. The benefits of transmission expansions in the competitive electricity markets

    International Nuclear Information System (INIS)

    Bresesti, Paola; Calisti, Roberto; Cazzol, Maria Vittoria; Gatti, Antonio; Vaiani, Andrea; Vailati, Riccardo; Provenzano, Dario

    2009-01-01

    The paper presents an innovative method for assessing simultaneously technical and economic benefits of transmission expansions. This method takes into account the new needs of the transmission planning process for competitive electricity markets, in which benefits of major transmission expansions include: (a) improved reliability, (b) increased availability of efficient supply and (c) increased competition among suppliers. The fundamental elements of the REliability and MARKet (REMARK) tool, which we implemented based on the aforementioned method, are: a yearly probabilistic simulation of power system operation; use of the non-sequential Monte Carlo method to pick the operational status of the network elements; full network representation; adoption of the simplified direct current model; quantitative assessment of the reliability benefits through the expected energy not supplied index; simulation of the strategic behaviour of suppliers based on a simplified model that correlates the price-cost mark-up to structural market variables (residual supply index and demand); a quantitative assessment of ''economic'' benefits through the calculation of the social welfare index. A test case application of the tool on the IEEE 24-bus reliability test system shows that the method can assess benefits of transmission expansions, in addition to the overall social perspective, for each market zone as well as separately for consumers, producers and transmission system operators. The results emphasize that the effect of transmission expansions in mitigating market power may be significant and that a simple and traditional cost-based approach may lead to a wrong evaluation of benefits given by transmission expansions. (author)

  8. Transmission diamond imaging detector

    Energy Technology Data Exchange (ETDEWEB)

    Smedley, John, E-mail: smedley@bnl.gov; Pinelli, Don; Gaoweia, Mengjia [Brookhaven National Laboratory, Upton, NY (United States); Muller, Erik; Ding, Wenxiang; Zhou, Tianyi [Stony Brook University, Stony Brook, NY (United States); Bohon, Jen [Case Center for Synchrotron Biosciences, Center for Proteomics and Bioinformatics, Case Western Reserve University, Cleveland, OH (United States)

    2016-07-27

    Many modern synchrotron techniques are trending toward use of high flux beams and/or beams which require enhanced stability and precise understanding of beam position and intensity from the front end of the beamline all the way to the sample. For high flux beams, major challenges include heat load management in optics (including the vacuum windows) and a mechanism of real-time volumetric measurement of beam properties such as flux, position, and morphology. For beam stability in these environments, feedback from such measurements directly to control systems for optical elements or to sample positioning stages would be invaluable. To address these challenges, we are developing diamond-based instrumented vacuum windows with integrated volumetric x-ray intensity, beam profile and beam-position monitoring capabilities. A 50 µm thick single crystal diamond has been lithographically patterned to produce 60 µm pixels, creating a >1kilopixel free-standing transmission imaging detector. This device, coupled with a custom, FPGA-based readout, has been used to image both white and monochromatic x-ray beams and capture the last x-ray photons at the National Synchrotron Light Source (NSLS). This technology will form the basis for the instrumented end-station window of the x-ray footprinting beamline (XFP) at NSLS-II.

  9. Control of schistosomiasis transmission

    Directory of Open Access Journals (Sweden)

    Luiz C. de S. Dias

    1995-04-01

    Full Text Available Despite the success of control programmes, schistosomiasis is still a serious public health problem in the world. More than 70 countries where 200 million individuals are evaluated to be infected of a total 600 million at risk. Though there have been important local success in the control of transmission, globally the infection has increased. Economic constrains in developing countries, environmental changes associated with migration and water resources development have been blocking the progress. The main objective of schistosomiasis control is to achieve reduction of disease due to schistosomiasis. We discussed the control measures like: health education, diagnosis and chemotherapy, safe water supplies, sanitation and snail control. We emphasized the need to give priority to school-age children and the importance of integrating the measures of control into locally available systems of health care. The control of schistosomiasis is directly related to the capacity of the preventive health services of an endemic country. The strategy of control requires long-term commitment from the international to the local level.

  10. Transmission acoustic microscopy investigation

    Science.gov (United States)

    Maev, Roman; Kolosov, Oleg; Levin, Vadim; Lobkis, Oleg

    The nature of acoustic contrast, i.e. the connection of the amplitude and phase of the output signal of the acoustic microscope with the local values of the acoustic parameters of the sample (density, elasticity, viscosity) is a central problem of acoustic microscopy. A considerable number of studies have been devoted to the formation of the output signal of the reflection scanning acoustic microscope. For the transmission acoustic microscope (TAM) this problem has remained almost unstudied. Experimental investigation of the confocal system of the TAM was carried out on an independently manufactured laboratory mockup of the TAM with the working frequency of the 420 MHz. Acoustic lenses with the radius of curvature of about 500 microns and aperture angle of 45 deg were polished out in the end faces of two cylindrical sound conductors made from Al2O3 single crystals with an axis parallel to the axis C of the crystal (the length of the sound conductor is 20 mm; diameter, 6 mm). At the end faces of the sound conductor, opposite to the lenses, CdS transducers with a diameter of 2 mm were disposed. The electric channel of the TAM provided a possibility for registering the amplitude of the microscope output signal in the case of the dynamic range of the 50 dB.

  11. 77 FR 32183 - Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities

    Science.gov (United States)

    2012-05-31

    ... record evidence, and was non-committal on whether a decision might be supported by theory alone.\\33\\ They...-effective investment decisions.\\6\\ It noted that this increase appears to be only the beginning of a longer... allocation processes may not affect each region of the country equally, it nonetheless remained concerned...

  12. Great Plains Wind Energy Transmission Development Project

    Energy Technology Data Exchange (ETDEWEB)

    Brad G. Stevens, P.E.; Troy K. Simonsen; Kerryanne M. Leroux

    2012-06-09

    In fiscal year 2005, the Energy & Environmental Research Center (EERC) received funding from the U.S. Department of Energy (DOE) to undertake a broad array of tasks to either directly or indirectly address the barriers that faced much of the Great Plains states and their efforts to produce and transmit wind energy at the time. This program, entitled Great Plains Wind Energy Transmission Development Project, was focused on the central goal of stimulating wind energy development through expansion of new transmission capacity or development of new wind energy capacity through alternative market development. The original task structure was as follows: Task 1 - Regional Renewable Credit Tracking System (later rescoped to Small Wind Turbine Training Center); Task 2 - Multistate Transmission Collaborative; Task 3 - Wind Energy Forecasting System; and Task 4 - Analysis of the Long-Term Role of Hydrogen in the Region. As carried out, Task 1 involved the creation of the Small Wind Turbine Training Center (SWTTC). The SWTTC, located Grand Forks, North Dakota, consists of a single wind turbine, the Endurance S-250, on a 105-foot tilt-up guyed tower. The S-250 is connected to the electrical grid on the 'load side' of the electric meter, and the power produced by the wind turbine is consumed locally on the property. Establishment of the SWTTC will allow EERC personnel to provide educational opportunities to a wide range of participants, including grade school through college-level students and the general public. In addition, the facility will allow the EERC to provide technical training workshops related to the installation, operation, and maintenance of small wind turbines. In addition, under Task 1, the EERC hosted two small wind turbine workshops on May 18, 2010, and March 8, 2011, at the EERC in Grand Forks, North Dakota. Task 2 involved the EERC cosponsoring and aiding in the planning of three transmission workshops in the midwest and western regions. Under Task

  13. HVDC power transmission technology assessment

    Energy Technology Data Exchange (ETDEWEB)

    Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

    1997-04-01

    The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

  14. Endoscopic transmission of Helicobacter pylori

    NARCIS (Netherlands)

    Tytgat, G. N.

    1995-01-01

    The contamination of endoscopes and biopsy forceps with Helicobacter pylori occurs readily after endoscopic examination of H. pylori-positive patients. Unequivocal proof of iatrogenic transmission of the organism has been provided. Estimates for transmission frequency approximate to 4 per 1000

  15. Energy Transmission and Infrastructure

    Energy Technology Data Exchange (ETDEWEB)

    Mathison, Jane

    2012-12-31

    The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers

  16. Use of new technologies in the solution of concrete problems in the national transmission system

    International Nuclear Information System (INIS)

    Martinez Gil, Javier

    2007-01-01

    As part of the elaboration of the expansion plan of the national transmission system, the UPME carries out analysis that contribute in the good and efficient use of this system, its amplification and correction of its weaknesses, for they revised it the state of the art of the flexible systems of transmission of alternating current and carry out preliminary analysis of its application

  17. Epistemic Planning

    DEFF Research Database (Denmark)

    Baral, Chitta; Bolander, Thomas; van Ditmarsch, Hans

    The seminar Epistemic Planning brought together the research communities of Dynamic Epistemic Logic, Knowledge Representation and Reasoning, and Automated Planning to address fundamental problems on the topic of epistemic planning. In the context of this seminar, dynamic epistemic logic...... investigates the formal semantics of communication and communicative actions, knowledge representation and reasoning focuses on theories of action and change, and automated planning investigates computational techniques and tools to generate plans. The original goals of the seminar were to develop benchmarks...... for epistemic planning, to explore the relationship between knowledge and belief in multi-agent epistemic planning, to develop models of agency and capability in epistemic planning and to explore action types and their representations (these originally separate goals were merged during the seminar), and finally...

  18. Expansion planning for electrical generating systems

    International Nuclear Information System (INIS)

    1984-01-01

    The guidebook outlines the general principles of electric power system planning in the context of energy and economic planning in general. It describes the complexities of electric system expansion planning that are due to the time dependence of the problem and the interrelation between the main components of the electric system (generation, transmission and distribution). Load forecasting methods are discussed and the principal models currently used for electric system expansion planning presented. Technical and economic information on power plants is given. Constraints imposed on power system planning by plant characteristics (particularly nuclear power plants) are discussed, as well as factors such as transmission system development, environmental considerations, availability of manpower and financial resources that may affect the proposed plan. A bibliography supplements the references that appear in each chapter, and a comprehensive glossary defines terms used in the guidebook

  19. Open Access Transmission Tariff: Effective December 18, 1998 (Revised June 16, 1999).

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1999-06-16

    Bonneville will provide Network Integration Transmission Service pursuant to the terms and conditions contained in this Tariff and Service Agreement. The service that Bonneville will provide under this Tariff allows a Transmission Customer to integrate, economically dispatch and regulate its current and planned Network Resources to serve its Network Load. Network Integration Transmission Service also may be used by the Transmission Customer to deliver nonfirm energy purchases to its Network Load without additional charge. To the extent that the transmission path for moving power from a Network Resource to a Network Load includes the Eastern and Southern Interties, the terms and conditions for service over such intertie facilities are provided under Part 2 of this Tariff. Also, transmission service for third-party sales which are not designated as Network Load will be provided under Bonneville's Point-to-Point Transmission Service (Part 2 of this Tariff).

  20. Planning for smallpox outbreaks

    Science.gov (United States)

    Ferguson, Neil M.; Keeling, Matt J.; John Edmunds, W.; Gani, Raymond; Grenfell, Bryan T.; Anderson, Roy M.; Leach, Steve

    2003-10-01

    Mathematical models of viral transmission and control are important tools for assessing the threat posed by deliberate release of the smallpox virus and the best means of containing an outbreak. Models must balance biological realism against limitations of knowledge, and uncertainties need to be accurately communicated to policy-makers. Smallpox poses the particular challenge that key biological, social and spatial factors affecting disease spread in contemporary populations must be elucidated largely from historical studies undertaken before disease eradication in 1979. We review the use of models in smallpox planning within the broader epidemiological context set by recent outbreaks of both novel and re-emerging pathogens.

  1. The evolution of transmission mode

    Science.gov (United States)

    Forbes, Mark R.; Hauffe, Heidi C.; Kallio, Eva R.; Okamura, Beth; Sait, Steven M.

    2017-01-01

    This article reviews research on the evolutionary mechanisms leading to different transmission modes. Such modes are often under genetic control of the host or the pathogen, and often in conflict with each other via trade-offs. Transmission modes may vary among pathogen strains and among host populations. Evolutionary changes in transmission mode have been inferred through experimental and phylogenetic studies, including changes in transmission associated with host shifts and with evolution of the unusually complex life cycles of many parasites. Understanding the forces that determine the evolution of particular transmission modes presents a fascinating medley of problems for which there is a lack of good data and often a lack of conceptual understanding or appropriate methodologies. Our best information comes from studies that have been focused on the vertical versus horizontal transmission dichotomy. With other kinds of transitions, theoretical approaches combining epidemiology and population genetics are providing guidelines for determining when and how rapidly new transmission modes may evolve, but these are still in need of empirical investigation and application to particular cases. Obtaining such knowledge is a matter of urgency in relation to extant disease threats. This article is part of the themed issue ‘Opening the black box: re-examining the ecology and evolution of parasite transmission’. PMID:28289251

  2. Transmission Line Series Compensation for Wind Energy Transmission

    International Nuclear Information System (INIS)

    Palanichamy, C; Wong, Y C

    2015-01-01

    Wind energy has demonstrated to be a clean, copious and absolutely renewable source of energy, and the large penetration of it into the power grid indicates that wind energy is considered an effective means of power generation, Transmission of wind energy from remote locations to load centers necessitates long transmission lines. Series compensation is a proven and economical transmission solution to address system power transfer strength, grid stability, and voltage profile issues of long transmission lines. In this paper, a programmable approach to determine the capacitive reactance of series capacitor and optimum location for its placement to achieve maximum power transfer gas been presented. The respective program with sample solutions has been provided for real-time applications. (paper)

  3. Midwest Transmission Workshop I Summary

    Energy Technology Data Exchange (ETDEWEB)

    Kevin Bryan

    2001-05-01

    OAK-B135 The meeting was opened with a review of the purposes of the workshop: (1) Present and discuss key studies and assessments of transmission upgrades, additions and related issues for the upper Midwest, including work that addresses the full range of views on these topics; (2) Understand the various transmission issues in the upper Midwest and discuss options for addressing the issues; and (3) Identify the decision makers and entities that need to play an active role if transmission issues are to be resolved, and agree on next steps for engaging these individuals and organizations through education, outreach, and information dissemination.

  4. Markets for financial transmission rights

    International Nuclear Information System (INIS)

    Kristiansen, T.

    2004-01-01

    Results of a survey of markets for financial transmission rights that facilitate competitive, open and non-discriminatory electricity market design are discussed. Specifically, the survey covered Pennsylvania, New Jersey, Maryland (PJM), New York, California, New England, Texas and New Zealand. The main emphasis was on the PJM and the New York markets, since they are the most mature. Interwowen with the results is a thorough discussion of the properties, features and the design of financial transaction rights in the various jurisdictions, the advantages, disadvantages and market performance of financial transmission rights, market performance criteria, and the mechanism for acquiring financial transmission rights. 49 refs., 14 tabs., 6 figs

  5. Transmission eigenvalues and thermoacoustic tomography

    International Nuclear Information System (INIS)

    Finch, David; Hickmann, Kyle S

    2013-01-01

    The spectrum of the interior transmission problem is related to the unique determination of the acoustic properties of a body in thermoacoustic imaging. Under a non-trapping hypothesis, we show that sparsity of the interior transmission spectrum implies a range separation condition for the thermoacoustic operator. In odd dimensions greater than or equal to 3, we prove that the interior transmission spectrum for a pair of radially symmetric non-trapping sound speeds is countable, and conclude that the ranges of the associated thermoacoustic maps have only trivial intersection. (paper)

  6. Forward planning

    International Nuclear Information System (INIS)

    Fontenla, D.P.

    2008-01-01

    By definition, forward planning is a process where input consists of conditions on beam configurations and parameters and output consists of dose distributions on target and critical structures, in contrast to inverse planning, where the opposite is true. For forward planning IMRT, criteria are as follows: (i) Plans created as an extension of standard 3D conformational planning; (ii) No significant increase in the complexity of the treatment planning or treatment delivery process; (3) Treatment verification using standard QA procedures; and process consists of the following steps: (i) Create a standard 3D conformational treatment plan; (ii) Copy one of the existing beams; (iii) Create control points: design new beam segments, blocking high dose areas; (iv) Repeat for all beams; (v) Re-compute dose; and (vi) Adjust control points weights to achieve desired dose distribution. A detailed exposition, with many clinical examples, is given for the breast, lung, and brain (P.A.)

  7. The evolution of plant virus transmission pathways

    Science.gov (United States)

    Frédéric M. Hamelin; Linda J.S. Allen; Holly R. Prendeville; M. Reza Hajimorad; Michael J. Jeger

    2016-01-01

    The evolution of plant virus transmission pathways is studied through transmission via seed, pollen, oravector. We address the questions: under what circumstances does vector transmission make pollen transmission redundant? Can evolution lead to the coexistence of multiple virus transmission pathways? We restrict the analysis to an annual plant population in which...

  8. Environment: Development plan 1993

    International Nuclear Information System (INIS)

    1992-01-01

    The concept of sustainable development is gradually being incorporated into the activities of Hydro-Quebec as part of that utility's environmental policy. In its proposed development plan, Hydro-Quebec's principal strategic environmental orientations comprise making environmental concerns an integral part of the planning process, managing impacts associated with the construction of generating and transmission facilities, and evaluating the utility's environmental performance. The approaches used, tools to be developed, and information required in each of these orientations are described. Issues considered include the strategic choices available for meeting electricity requirements, including renewable energy sources; the evaluation of environmental externalities; the use of environmental impact assessment studies and environmental monitoring; relationships with native peoples and mitigation of the social impacts of northern hydroelectric development; protection and management of natural and human habitats; the utility's contribution to regional development; management of wastes and rights-of-way; and environmental auditing. 1 tab

  9. Novel approach to assess local market power considering transmission constraints

    International Nuclear Information System (INIS)

    Li, Canbing; Xia, Qing; Kang, Chongqing; Jiang, Jianjian

    2008-01-01

    Market power (MP) assessment and mitigation affect the efficiency of the generation market. The traditional indices such as HHI and Lerner index can not express local market power, which caused by transmission constraints. Transmission constraints divide the market into some smaller parts. Some generators can abuse their MP in one part but not in the whole market. This paper describes a new approach to assess market power. The main contributions of the new method can be summarized as following. First, the concept of local market is developed, and the whole power system is divided into several local markets, as transmission congestions dividing the market. In the local markets, there are no transmission constraints so local market power does not exist. Then the local market power index (LMPI) is calculated according to market concentration, transmission constraints, and demand-supply ratio. Based on LMPI, the integrated local market power index which describes the whole picture of market can be obtained. It has been proved that the new approach can assess market power exactly, and identify the critical factor that results in market power and where generators are easy to exercise market power. The finding in this paper is helpful for market monitoring and mitigating market power. Moreover, the new index can be used to evaluate the power grid availability to generation competition and the power transmission expansion planning. (author)

  10. BC Hydro's transmission business : transition to a competitive marketplace

    International Nuclear Information System (INIS)

    Threlkeld, R.J.

    1998-01-01

    Progress made by BC Hydro to facilitate the use of the transmission system for wholesale electricity transactions, including the separation of the system operation function from generation and merchant functions, was discussed. BC Hydro, Canada's third largest electric utility, was the first Canadian utility to offer open access to its transmission system for wholesale transactions. The utility has an installed generating capacity of about 10.8 gigawatts, 90 per cent of which is hydroelectric. The remainder is thermal, gas turbine and stationary and mobile diesel generation. The key element in establishing wholesale transmission transactions was the FERC-mandated open access same-time information system (OASIS) on which BC Hydro posts available transmission capacity, planned outages and pricing. The system operates on BC Hydro's internet node and interfaces to a Transmission Scheduling System (TSS). The TSS was developed in-house to handle the increased complexity of scheduling multiple energy and capacity transactions for users of the transmission system. Operation of the system and the challenge to constantly improve it were discussed

  11. Echinococcosis : disease, detection and transmission

    NARCIS (Netherlands)

    Craig, P.S.; Rogan, M T; Campos-Ponce, M

    2003-01-01

    Echinococcosis is one of the world's most geographically widespread parasitic zoonoses, with transmission occurring in tropical, temperate and arctic biomes. Most human infections are due to Echinococcus granulosus transmitted between domestic dogs and livestock, but this cosmopolitan species also

  12. Hybrid-Vehicle Transmission System

    Science.gov (United States)

    Lupo, G.; Dotti, G.

    1985-01-01

    Continuously-variable transmission system for hybrid vehicles couples internal-combustion engine and electric motor section, either individually or in parallel, to power vehicle wheels during steering and braking.

  13. Accounting-related transmission issues

    International Nuclear Information System (INIS)

    Niehaus, M.; Bjorn, P.; Pate, G.

    1999-01-01

    Various initiatives have been undertaken by the Federal Energy Regulatory Commission (FERC) to deregulate wholesale electric energy markets. These initiatives have focused on restructuring the transmission systems in the US and recently have culminated in a proposal requiring formation of and participation in regional transmission organizations. The overall form of regulation selected to determine rates for transmission entities as well as underlying regulatory decisions reached on key issues will have profound implications for transmission entities. For example, traditional cost-based regulation would require one set of accounting and reporting rules, while incentive-based regulation may not be subject to those same rules. An overview of some of the major accounting and financial reporting issues that will need to be considered is presented

  14. Transmission of Information: An Overview.

    Science.gov (United States)

    Thoma, George R.

    1981-01-01

    Outlines the basic principles underlying the transmission of information, including analog and digital modulation, limitations to communications, configurations of communications networks, optical fiber cables, and earth satellites. Six references are cited. (FM)

  15. Evidence of localized wave transmission

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    LLNL [Lawrence Livermore National Lab.] experiments to test the feasibility of launching an acoustic, directed-energy pulse train (ADEPT) in water have demonstrated localized transmission of wave energy far beyond the classical Rayleigh length that defines the boundary between near-field and far-field transmission for Gaussian (diffraction-limited) pulses. The results of the experiments are in excellent agreement with computer simulations

  16. Radio and line transmission 2

    CERN Document Server

    Roddy, Dermot

    2013-01-01

    Radio and Line Transmission, Volume 2 gives a detailed treatment of the subject as well as an introduction to additional advanced subject matter. Organized into 14 chapters, this book begins by explaining the radio wave propagation, signal frequencies, and bandwidth. Subsequent chapters describe the transmission lines and cables; the aerials; tuned and coupled circuits; bipolar transistor amplifiers; field-effect transistors and circuits; thermionic valve amplifiers; LC oscillators; the diode detectors and modulators; and the superheterodyne receiver. Other chapters explore noise and interfere

  17. Heartland Alliance for Regional Transmission

    Energy Technology Data Exchange (ETDEWEB)

    Jackson, Nancy [Climate and Energy Project, Inc., Hutchinson, KS (United States)

    2017-03-15

    The Heartland Alliance for Regional Transmission (HART) will foster a candid, productive conversation among stakeholders that identifies challenges to and benefits from a massive build out of wind generation and transmission across the Southwest Power Pool. Based on the outcomes of those deliberations, HART will develop and deliver an ambitious, coordinated, peer-to-peer outreach effort that spans the SPP to improve market acceptance for wind.

  18. Essays on electricity transmission investment and financial transmission rights

    Science.gov (United States)

    Shang, Wenzhuo

    The U.S. electric power industry has been going through fundamental restructuring and realignment since the 1990's. Many issues and problems have emerged during the transition, and both economists and engineers have been looking for the solutions fervently. In this dissertation, which consists primarily of three essays, we apply economics theory and techniques to the power industry and address two related issues, transmission investment and financial transmission rights (FTRs). The first essay takes the decentralized perspective and investigates the efficiency attribute of market-based transmission investment under perfect competition. We clarify, for the first time, the nature of the externality created by loop flows that causes transmission investment to be inefficient. Our findings have important implications for better understanding of transmission market design and creating incentives for efficient transmission investment. In the second essay, we define several rules for allocating transmission investment cost within the framework of cooperative game theory. These rules provide fair, stable or efficient cost allocations in theory and are good benchmarks against which the allocation mechanism in practice can be compared and improved upon. In the last essay, we make exploratory efforts in analyzing and assessing empirically the performance of the Midwest independent system operator (MISO) FTR auction market. We reveal some stylized facts about this young market and find that it is not efficient under the risk-neutrality assumption. We also point out and correct the drawbacks in previous related work and suggest about more complete empirical work in future. In all, this dissertation makes both theoretic and empirical analysis of the two hot issues related to the power industry and comes up with findings that have important implications for the development of this industry.

  19. Relevance of indirect transmission for wildlife disease surveillance

    Directory of Open Access Journals (Sweden)

    Martin Lange

    2016-11-01

    Full Text Available Epidemiological models of infectious diseases are essential tools in support of risk assessment, surveillance design and contingency planning in public and animal health. Direct pathogen transmission from host to host is an essential process of each host-pathogen system and respective epidemiological modelling concepts. It is widely accepted that numerous diseases involve indirect transmission through pathogens shed by infectious hosts to their environment. However, epidemiological models largely do not represent pathogen persistence outside the host explicitly. We hypothesize that this simplification might bias management-related model predictions for disease agents that can persist outside their host for a certain time span. We adapted an individual-based, spatially explicit epidemiological model that can mimic both transmission processes. One version explicitly simulated indirect pathogen transmission through a contaminated environment. A second version simulated direct host-to-host transmission only. We aligned the model variants by the transmission potential per infectious host (i.e. basic reproductive number R0 and the spatial transmission kernel of the infection to allow unbiased comparison of predictions. The quantitative model results are provided for the example of surveillance plans for early detection of foot-and-mouth disease in wild boar, a social host.We applied systematic sampling strategies on the serological status of randomly selected host individuals in both models. We compared between the model variants the time to detection and the area affected prior to detection, measures that strongly influence mitigation costs. Moreover, the ideal sampling strategy to detect the infection in a given time frame was compared between both models.We found the simplified, direct transmission model to underestimate necessary sample size by up to one order of magnitude, but to overestimate the area put under control measures. Thus, the model

  20. Research on optimal investment path of transmission corridor under the global energy Internet

    Science.gov (United States)

    Huang, Yuehui; Li, Pai; Wang, Qi; Liu, Jichun; Gao, Han

    2018-02-01

    Under the background of the global energy Internet, the investment planning of transmission corridor from XinJiang to Germany is studied in this article, which passes through four countries: Kazakhstan, Russia, Belarus and Poland. Taking the specific situation of different countries into account, including the length of transmission line, unit construction cost, completion time, transmission price, state tariff, inflation rate and so on, this paper constructed a power transmission investment model. Finally, the dynamic programming method is used to simulate the example, and the optimal strategies under different objective functions are obtained.

  1. The Manitoba-Ontario intertie : perspectives of a merchant transmission developer

    International Nuclear Information System (INIS)

    Van Beers, R.

    2006-01-01

    This presentation discussed merchant transmission models for the Manitoba-Ontario intertie. Merchant transmission involves the reallocation of risk from rate payers to investors and facility users. Merchant transmission is now a niche market due to the fact that the power industry is now more centrally planned. However, merchant transmission structures limit the ability to fully assess congestion and nodal values, and governments continue to retain control of the power sector. Power generation and contracting trends are now changing as a result of market liberalization. In order to be successful, power merchants require financial markets that possess an understanding of the electricity sector. In a merchant transmission scenario, the sizing, timing, connection points, and tariffs will be determined by demonstrated commercial value, and not by central planning principles. The presentation included consideration of government block contracts and reverse block contracts. Details of the Montana-Alberta intertie project were also provided. tabs., figs

  2. Inspection planning

    International Nuclear Information System (INIS)

    Korosec, D.; Levstek, M.F.

    2001-01-01

    Slovenian Nuclear Safety Administration (SNSA) division of nuclear and radiological safety inspection has developed systematic approach to their inspections. To be efficient in their efforts regarding regular and other types of inspections, in past years, the inspection plan has been developed. It is yearly based and organized on a such systematic way, that all areas of nuclear safety important activities of the licensee are covered. The inspection plan assures appropriate preparation for conducting the inspections, allows the overview of the progress regarding the areas to be covered during the year. Depending on the licensee activities and nature of facility (nuclear power plant, research reactor, radioactive waste storage, others), the plan has different levels of intensity of inspections and also their frequency. One of the basic approaches of the plan is to cover all nuclear and radiological important activities on such way, that all regulatory requests are fulfilled. In addition, the inspection plan is a good tool to improve inspection effectiveness based on previous experience and allows to have the oversight of the current status of fulfillment of planned inspections. Future improvement of the plan is necessary in the light of newest achievements on this field in the nuclear world, that means, new types of inspections are planned and will be incorporated into plan in next year.(author)

  3. EHV transmission maintenance. A total asset strategy

    International Nuclear Information System (INIS)

    Bronsdon, J.A.N.

    1996-01-01

    For countries whose economies are rapidly expanding, the demand for power, and in particular electricity, is resulting in rapid expansions of the generation, transmission and distribution of electricity. This means that a new plant is being installed which, apart from some minor post commissioning problems, will be free from major maintenance for several years to come. Consequently, in such cases, maintenance is confined to basic annual shutdown checks and routine online monitoring. As equipment and plant age it is important to commence planning for additional maintenance over and above these basic annual checks; to monitor performance; to monitor faults and defects and to use that information to engineer out design faults, to influence current maintenance techniques and to influence future procurement specifications. Also, provided that sufficient information is available, informed decisions can be taken as to when a power plant should be decommissioned or refurbished. This process can be described as a total asset management strategy covering all decisions from procurement through to commissioning, ongoing maintenance, refurbishment, decommissioning and reappraisal of specifications for future procurement. Based upon the author's experience within the United Kingdom Electricity Supply industry, a total asset strategy will be proposed for EHV transmission plant that will optimise current and future expenditure while maximizing reliability and minimising downtime. 1 ref., 5 figs

  4. Survey of transmission line corridors. [Data on delays in transmission line construction

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-05

    The intent of this study is to determine the extent of delays experienced in planning and constructing transmission lines in the continental United States. The reasons for the delays are identified for each line studied and their effect on the total electrical system is sought. Data was collected for 136 different lines either recently built or currently under study. Statistics were developed for each line in several categories and comparisons of lines delayed were made by company, area served and generation capacity. From the study presented here it was found that: right-of-way acquisition procedures including condemnation and easement negotiation practices delay more projects than local, state and federal regulatory requirements combined; load growth reductions particularly in the east have reduced the impact of regulatory delays; the south, southeast and southwestern areas of the country experience fewer delays in constructing transmission lines than the more populated states, and the cost for corridor delays was responded to for only 17 of the 142 projects surveyed. By far the most costly delay is the expense of condemning land for transmission right-of-way.

  5. Measuring the competitiveness benefits of a transmission investment policy: The case of the Alberta electricity market

    International Nuclear Information System (INIS)

    Wolak, Frank A.

    2015-01-01

    Transmission expansions can increase the extent of competition faced by wholesale electricity suppliers with the ability to exercise unilateral market power. This can cause them to submit offer curves closer to their marginal cost curves, which sets market-clearing prices closer to competitive benchmark price levels. These lower wholesale market-clearing prices are the competitiveness benefit consumers realize from the transmission expansion. This paper quantifies empirically the competitiveness benefits of a transmission expansion policy that causes strategic suppliers to expect no transmission congestion. Using hourly generation-unit level offer, output, market-clearing price and congestion data from the Alberta wholesale electricity market from January 1, 2009 to July 31, 2013, an upper and lower bound on the hourly consumer competitiveness benefits of this transmission policy is computed. Both of these competitiveness benefits measures are economically significant, which argues for including them in transmission planning processes for wholesale electricity markets to ensure that all transmission expansions with positive net benefits to electricity consumers are undertaken. -- Highlights: •Define competitiveness benefits to consumers from transmission expansions in wholesale market. •Compute upper and lower bounds on competitiveness benefits for Alberta market. •Compare no-perceived congestion prices to actual prices to measure competitiveness benefits. •Economically substantial competitiveness benefits found for sample period studied. •To ensure adequate transmission, planning processes should account for these benefits

  6. First hvdc underwater transmission links mainland and Vancouver

    Energy Technology Data Exchange (ETDEWEB)

    1967-06-01

    Delicate and complex equipment for North America's first hvdc underwater transmission line is being installed. The power link will connect British Columbia Hydro and power authority's switchyards on the mainland near Ladner with the western terminus of the transmission scheme at Duncan on Vancouver Island, a distance of 42 miles. Nearly 19 miles of the transmission will be underwater, between Tsawwassen and Galiano Island, and between Parker and Saltspring Islands. The remaining distance will be spanned by a conventional aerial conductor. The submarine conductor cable will be approximately 3-1/2 inches in diameter and its copper core will be sheathed in lead and armored with a ring of steel wire. The cable, which is being manufactured in Calais, France, and coiled in a planned sequence aboard the cable laying vessel, Marcel Bayard, will be placed across the Gulf of Georgia in the spring of 1968.

  7. Communication Planning.

    Science.gov (United States)

    Development Communication Report, 1978

    1978-01-01

    Communication planning in developing countries is discussed in individual articles on theory, knowledge production and utilization, planning at the regional level, software, and rural development. A nutrition education project and three experiments in developing educational materials with feedback from villagers in Africa are described in the…

  8. Conference Planning.

    Science.gov (United States)

    Carter, Richard

    1982-01-01

    Presents an overview of the management planning technique known as Break Even Analysis and outlines its use as a tool in financial planning for organizations intending to conduct or sponsor a conference, seminar, or workshop. Three figures illustrating Break Even Analysis concepts and a Break Even Analysis worksheet are included. (JL)

  9. Systemic Planning

    DEFF Research Database (Denmark)

    Leleur, Steen

    This book presents principles and methodology for planning in a complex world. It sets out a so-called systemic approach to planning, among other things, by applying “hard” and “soft” methodologies and methods in combination. The book is written for Ph.D and graduate students in engineering...

  10. Atlas transmission line breakdown analysis

    CERN Document Server

    Nielsen, K E; Ballard, E O; Elizondo, J M; Gribble, R F; McCuistian, B T; Parsons, W M

    1999-01-01

    The Atlas facility will use 24 radially converging, vertically oriented and tapered, oil insulated, triplate transmission lines between the Marx generators and the central load region. Among the requirements of the transmission lines are low inductance and high reliability. The inter-conductor gap is nominally 2 cm and the lines taper from a height of 1.75 m at the Marx end to 0.32 m at the output end. The aluminum conductors, held together by 20 insulating spacers, are assembled and inserted as a unit into radial oil-filled steel tanks. The negative, high-voltage, center conductor is 2.54-cm thick and the outer ground conductors are 1.59-cm thick. All 24 triplate transmission lines connect to a transition section at near 1 m radius that couples the transmission lines to a disk/conical solid- dielectric-insulated power flow channel transmission line terminating at the load. Peak operating voltage on the lines can be as high as 240 kV with an effective stress time of 0.8 mu s. Testing of small sections of the ...

  11. BPA/PGE transmission support project: Final environmental assessment

    International Nuclear Information System (INIS)

    1996-12-01

    This Mitigation Action Plan describes the mitigation measures identified in the BPA/PGE Transmission Support Project Environmental Assessment. These measures commit to actions that will reduce the environmental impacts that could occur by constructing, operating and maintaining the transmission line and related facilities. They have been developed in coordination with environmental specialists, design and construction engineers and maintenance personnel. The measures will be written into the construction specifications for the project, which is expected to be constructed by contract personnel. Unless noted in the plan, the construction inspector or the line foreman would be responsible for carrying out the mitigation; environmental staff would also monitor the area for mitigation effectiveness. The right-of-way would be cleared in 1997 or 1998, and construction would begin in the spring of 1998 and be completed later that fall

  12. Business plan in brief. Draft

    International Nuclear Information System (INIS)

    1994-06-01

    Competition is revolutionizing the electricity industry, and utilities may never be the same. In the past two decades, government deregulation has transformed the airline, cable television, natural gas, and telecommunications industries. Now, with the passage of new laws which have spurred the growth of independent power and opened up transmission access, the electric utility industry has become the laboratory for change. Here in the Northwest, dramatic changes in the electric industry mean that the Bonneville Power Administration (BPA) is facing real competition. Our customers have more choices than they had in the past. BPA's draft Business Plan is a direct response to this changing environment. The plan presents how we propose to adapt to the new competitive marketplace. This is a summary of the plan and some of the important issues it raises for regional discussion. The draft plan contains much more detail on all the topics mentioned here. Business Plan is BPA's first attempt to integrate the long-term strategic plans of the various parts of the agency with a strategic financial plan. Change is evident throughout the plan--change in our operating environment, in our strategic direction, in our customer and constituent relationships, and in BPA itself as an organization

  13. Investment in Electricity Generation and Transmission: Decision Making Under Uncertainty

    DEFF Research Database (Denmark)

    Conejo, Antonio J.; Baringo, Luis; Kazempour, Jalal

    This book provides an in-depth analysis of investment problems pertaining to electric energy infrastructure, including both generation and transmission facilities. The analysis encompasses decision-making tools for expansion planning, reinforcement, and the selection and timing of investment...... undergraduate and graduate students in the fields of electric energy systems, operations research, management science, and economics. Practitioners in the electric energy sector will also benefit from the concepts and techniques presented here....

  14. Plasmodium vivax Transmission in Africa.

    Directory of Open Access Journals (Sweden)

    Rosalind E Howes

    2015-11-01

    Full Text Available Malaria in sub-Saharan Africa has historically been almost exclusively attributed to Plasmodium falciparum (Pf. Current diagnostic and surveillance systems in much of sub-Saharan Africa are not designed to identify or report non-Pf human malaria infections accurately, resulting in a dearth of routine epidemiological data about their significance. The high prevalence of Duffy negativity provided a rationale for excluding the possibility of Plasmodium vivax (Pv transmission. However, review of varied evidence sources including traveller infections, community prevalence surveys, local clinical case reports, entomological and serological studies contradicts this viewpoint. Here, these data reports are weighted in a unified framework to reflect the strength of evidence of indigenous Pv transmission in terms of diagnostic specificity, size of individual reports and corroboration between evidence sources. Direct evidence was reported from 21 of the 47 malaria-endemic countries studied, while 42 countries were attributed with infections of visiting travellers. Overall, moderate to conclusive evidence of transmission was available from 18 countries, distributed across all parts of the continent. Approximately 86.6 million Duffy positive hosts were at risk of infection in Africa in 2015. Analysis of the mechanisms sustaining Pv transmission across this continent of low frequency of susceptible hosts found that reports of Pv prevalence were consistent with transmission being potentially limited to Duffy positive populations. Finally, reports of apparent Duffy-independent transmission are discussed. While Pv is evidently not a major malaria parasite across most of sub-Saharan Africa, the evidence presented here highlights its widespread low-level endemicity. An increased awareness of Pv as a potential malaria parasite, coupled with policy shifts towards species-specific diagnostics and reporting, will allow a robust assessment of the public health

  15. Topics in lightwave transmission systems

    CERN Document Server

    Li, Tingye

    1991-01-01

    Topics in Lightwave Transmission Systems is a second volume of a treatise on optical fiber communications that is devoted to the science, engineering, and application of information transmission via optical fibers. The first volume, published in 1985, dealt exclusively with fiber fabrication. The present volume contains topics that pertain to subsystems and systems. The book contains five chapters and begins with discussions of transmitters and receivers, which are basic to systems now operating in the field. Subsequent chapters cover topics relating to coherent systems: frequency and phase m

  16. Transmission pricing: paradigms and methodologies

    Energy Technology Data Exchange (ETDEWEB)

    Shirmohammadi, Dariush [Pacific Gas and Electric Co., San Francisco, CA (United States); Vieira Filho, Xisto; Gorenstin, Boris [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Pereira, Mario V.P. [Power System Research, Rio de Janeiro, RJ (Brazil)

    1994-12-31

    In this paper we describe the principles of several paradigms and methodologies for pricing transmission services. The paper outlines some of the main characteristics of these paradigms and methodologies such as where they may be used for best results. Due to their popularity, power flow based MW-mile and short run marginal cost pricing methodologies will be covered in some detail. We conclude the paper with examples of the application of these two pricing methodologies for pricing transmission services in Brazil. (author) 25 refs., 2 tabs.

  17. 75 FR 27341 - Increasing Market and Planning Efficiency Through Improved Software; Notice of Technical...

    Science.gov (United States)

    2010-05-14

    ..., ramp rates, and network topology), flexible dispatch, settlement calculations, transmission switching... Market and Planning Efficiency Through Improved Software; Notice of Technical Conference To Discuss Increasing Market and Planning Efficiency Through Improved Software May 7, 2010. Take notice that Commission...

  18. Marketing plan

    OpenAIRE

    Jantunen, Essi; Hellman, Annika

    2012-01-01

    The aim of this bachelor’s thesis was to draw up an efficient marketing plan for Pohjolan Vihreä Polku Oy, which offers meeting and nature activity services. The company was in a process of conversion and needed a structured marketing plan. The objectives of the company were perceived through severe research. The main purposes of the marketing plan were to raise the visibility of the company and increase its clientele. The proposed marketing actions are also to be used to improve the company’...

  19. Ontological Planning

    Directory of Open Access Journals (Sweden)

    Ahmet Alkan

    2017-12-01

    • Is it possible to redefine ontology within the hierarchical structure of planning? We are going to seek answers to some of these questions within the limited scope of this paper and we are going to offer the rest for discussion by just asking them. In light of these assessments, drawing attention, based on ontological knowledge relying on the wholeness of universe, to the question, on macro level planning, of whether or not the ontological realities of man, energy and movements of thinking can provide macro data for planning on a universal level as important factors affecting mankind will be one of the limited objectives of the paper.

  20. Planning ahead

    Energy Technology Data Exchange (ETDEWEB)

    Davies, J. [Mintec Inc. (US)

    2004-09-01

    The paper presents a state-of-the-art mine planning program that facilitates data storage and provides easy access to essential mine information. MineSight from Mintec, Inc., and the addition MineSight 3D provide a powerful tool used by major coal companies worldwide, offering modelling of different deposit types and complete planning tools including advanced surface/surface and solid/surface intersection routines. The new MineSight Operations addition helps to streamline the planning process and store raw blasthole data (in acQuire) and essential cut attribute information. 12 figs.

  1. Microwave energy transmission system for solar power station

    Energy Technology Data Exchange (ETDEWEB)

    Matsumoto, Hiroshi

    1988-05-05

    This paper deals with a microwave wireless energy transmission system which will be required for a solar power station under investigation, particularly, it describes its foundation and future investigation. It is supposed that for realization of microwave wireless transmission techniques, it is most important to investigate the effect of strong microwave beams on a plasma environment, establish control techniques for microwave beams in which a retro-directive system is combined with a computer control system, and develop a semiconductor transmission module. Institute of Space and Astronautical Science (Japan) made an experiment on the effect of microwaves on ionospheric plasma by using an observatory rocket. The institute has planned to make an experiment on a microwave energy transmission system which is to be mounted to a small-scale space flyer unit in order to examine the control of microwave beams and 10 KW power transmission, in addition to investigation on the interaction of microwave energy beams with a plasma environment. (4 figs, 3 tabs, 20 refs)

  2. Navajo transmission project Draft Environmental Impact Statement (DEIS)

    International Nuclear Information System (INIS)

    1996-09-01

    Dine Power Authority, a Navajo Nation enterprise, proposes to construct a 500 kilovolt transmission line planned to deliver electrical power from the Shiprock Substation in northwestern New Mexico to either the Mead or the Marketplace Substation in southern Nevada. The line would relieve constraints on transmission of electricity west from the Four Comers area; improve operational flexibility and reliability of the overall system; and allow increased economical transfers, sales, and purchases in the Rocky Mountains/Four Comers/Desert Southwest region. Also, the project allows an opportunity for the Navajo Nation to participate in the electrical utility industry and promote economic development to benefit the people of the Navajo Nation. Alternatives considered include energy conservation and electric load management, new generation facilities, use of existing transmission systems, alternative transmission technologies, no action, and the proposed action. For the proposed action, several alternative routes and ancillary facility locations are addressed: four alternative routes and five substations in the eastern portion of the project area; and six alternative routes, three substation sites, and a microwave communication facility in the western portion of the project area. The existing condition of the environmental resources in the project area is described and potential impacts on those resources as a result of the proposed action are addressed. The impacts of the proposed action would be caused mainly by access roads, tower sites, and other associated facilities on soils, vegetation, wildlife, and cultural and paleontological resources, and the impact of the transmission line's presence on visual resources and land uses

  3. Multi-region optimal deployment of renewable energy considering different interregional transmission scenarios

    International Nuclear Information System (INIS)

    Wang, Ge; Zhang, Qi; Mclellan, Benjamin C.; Li, Hailong

    2016-01-01

    Renewable energy is expected to play much more important role in future low-carbon energy system, however, renewable energy has problems with regard to load-following and regional imbalance. This study aims to plan the deployment of intermittent renewable energy in multiple regions considering the impacts of regional natural conditions and generation capacity mix as well as interregional transmission capacity using a multi-region dynamic optimization model. The model was developed to find optimized development paths toward future smart electricity systems with high level penetration of intermittent renewable energy considering regional differences and interregional transmission at national scale. As a case study, the model was applied to plan power generation in nine interconnected regions in Japan out to 2030. Four scenarios were proposed with different supporting policies for the interregional power transmission infrastructures and different nuclear power phase-out scenarios. The analysis results show that (i) the government's support for power transmission infrastructures is vital important to develop more intermittent renewable energy in appropriate regions and utilize renewable energy more efficiently; (ii) nuclear and renewable can complement rather than replace each other if enough interregional transmission capacity is provided. - Highlights: • Plan the optimal deployment of intermittent renewable energy in multiple regions. • A multi-region dynamic optimization model was developed. • The impacts of natural conditions and interregional transmission are studied. • The government's support for transmission is vital important for renewable energy. • Nuclear and renewable can complement rather than replace each other.

  4. Planning Meals

    Science.gov (United States)

    ... Take the guess work out of what to eat using our tips, recipes and sample meals. Featured Book: Ultimate Diabetes Meal Planner includes weekly plans for breakfast, lunch, dinner, and snacks, along with detailed recipes that make ...

  5. An overview of the proposal to create a regional transmission organization for New England

    International Nuclear Information System (INIS)

    LaPlante, D.

    2003-01-01

    The history of the regional transmission organization (RTO) in New England was reviewed in this PowerPoint presentation. Application for the RTO structure, based on FERC's Order 2000, was first filed by ISO New England and transmission owners in January 2001. It was rejected due to inadequate scope and independence. A second application, which included a plan for a single Northeast RTO and a merger of the system operators in New England (NE), New York and Pennsylvania, New Jersey and Maryland, was also deemed infeasible. In October 2003, the ISO New England filed for a New England-only RTO. The main benefits of an RTO include greater independence of system operations, improved reliability, enhanced market efficiency, an improved regional planning process and a more stable organizational structure for the New England system operator. This presentation reviewed the extensive stakeholder process, RTO governing documents, and the RTO-NE tariff. The objective of system planning and expansion is to clarify the role of the RTO regarding authority and process and to publish an annual regional system plan by the RTO-NE which identifies reliability and market efficiency needs. The regional system plan considers projected generation, transmission projects and supply and demand issues. Two types of transmission operating agreements were also reviewed. The responsibility of the transmission operator is to physically operate the transmission facilities in accordance with RTO-NE directions; establish ratings and rating procedures for transmission facilities; and, operate, repair and maintain transmission facilities. The allocation of Section 205 Rights was discussed along with coordination efforts with New York and cooperation with Canadian entities. 1 fig

  6. Education plan

    International Nuclear Information System (INIS)

    Baur, J.

    1987-01-01

    There is pressing need for education of fusion people and those in the radiation effects community on the role of radiation hardening in radiation diagnostic. There is no plan at present to do this. The plan is to be proposed and developed. The education methods should include distribution of a primer, the proceedings of this workshop, and updated data compilations and talks by experts at the fusion labs, universities, and meetings

  7. business plan

    OpenAIRE

    Luzan, Dmitrij

    2009-01-01

    My thesis is dedicated to the business plan of the gastronomic facility. The thesis describes foundation of the company, analyses demand for the gastronomic services. The financial plan is being presented as well. The thesis includes the analysis of the company's environment, suppliers and customers. SWOT analysis, net present value analysis, index of the net present value and other ratio indexes are the parts of this thesis.

  8. Money and transmission of bacteria.

    NARCIS (Netherlands)

    Gedik, H.; Voss, T.A.; Voss, A.

    2013-01-01

    Money is one of the most frequently passed items in the world. The aim of this study was to ascertain the survival status of bacteria including Staphylococcus aureus, Escherichia coli, and Vancomycin- Resistant Enterococci (VRE) on banknotes from different countries and the transmission of bacteria

  9. Neutron Transmission through Sapphire Crystals

    DEFF Research Database (Denmark)

    of simulations, in order to reproduce the transmission of cold neutrons through sapphire crystals. Those simulations were part of the effort of validating and improving the newly developed interface between the Monte-Carlo neutron transport code MCNP and the Monte Carlo ray-tracing code McStas....

  10. Transmission electron microscopy of bone

    NARCIS (Netherlands)

    Everts, Vincent; Niehof, Anneke; Tigchelaar-Gutter, Wikky; Beertsen, Wouter

    2012-01-01

    This chapter describes procedures to process mineralized tissues obtained from different sources for transmission electron microscopy (TEM). Methods for fixation, resin embedding, staining of semi-thin sections and ultrathin sections are presented. In addition, attention will be paid to processing

  11. Performance analysis of a model-sized superconducting DC transmission system based VSC-HVDC transmission technologies using RTDS

    International Nuclear Information System (INIS)

    Dinh, Minh-Chau; Ju, Chang-Hyeon; Kim, Sung-Kyu; Kim, Jin-Geun; Park, Minwon; Yu, In-Keun

    2012-01-01

    The combination of a high temperature superconducting DC power cable and a voltage source converter based HVDC (VSC-HVDC) creates a new option for transmitting power with multiple collection and distribution points for long distance and bulk power transmissions. It offers some greater advantages compared with HVAC or conventional HVDC transmission systems, and it is well suited for the grid integration of renewable energy sources in existing distribution or transmission systems. For this reason, a superconducting DC transmission system based HVDC transmission technologies is planned to be set up in the Jeju power system, Korea. Before applying this system to a real power system on Jeju Island, system analysis should be performed through a real time test. In this paper, a model-sized superconducting VSC-HVDC system, which consists of a small model-sized VSC-HVDC connected to a 2 m YBCO HTS DC model cable, is implemented. The authors have performed the real-time simulation method that incorporates the model-sized superconducting VSC-HVDC system into the simulated Jeju power system using Real Time Digital Simulator (RTDS). The performance analysis of the superconducting VSC-HVDC systems has been verified by the proposed test platform and the results were discussed in detail.

  12. Performance analysis of a model-sized superconducting DC transmission system based VSC-HVDC transmission technologies using RTDS

    Energy Technology Data Exchange (ETDEWEB)

    Dinh, Minh-Chau, E-mail: thanchau7787@gmail.com [Changwon National University, 9 Sarim-Dong, Changwon 641-733 (Korea, Republic of); Ju, Chang-Hyeon; Kim, Sung-Kyu; Kim, Jin-Geun; Park, Minwon [Changwon National University, 9 Sarim-Dong, Changwon 641-733 (Korea, Republic of); Yu, In-Keun, E-mail: yuik@changwon.ac.kr [Changwon National University, 9 Sarim-Dong, Changwon 641-733 (Korea, Republic of)

    2012-08-15

    The combination of a high temperature superconducting DC power cable and a voltage source converter based HVDC (VSC-HVDC) creates a new option for transmitting power with multiple collection and distribution points for long distance and bulk power transmissions. It offers some greater advantages compared with HVAC or conventional HVDC transmission systems, and it is well suited for the grid integration of renewable energy sources in existing distribution or transmission systems. For this reason, a superconducting DC transmission system based HVDC transmission technologies is planned to be set up in the Jeju power system, Korea. Before applying this system to a real power system on Jeju Island, system analysis should be performed through a real time test. In this paper, a model-sized superconducting VSC-HVDC system, which consists of a small model-sized VSC-HVDC connected to a 2 m YBCO HTS DC model cable, is implemented. The authors have performed the real-time simulation method that incorporates the model-sized superconducting VSC-HVDC system into the simulated Jeju power system using Real Time Digital Simulator (RTDS). The performance analysis of the superconducting VSC-HVDC systems has been verified by the proposed test platform and the results were discussed in detail.

  13. Opportunities and Benefits for Increasing Transmission Capacity between the US Eastern and Western Interconnections

    Science.gov (United States)

    Figueroa-Acevedo, Armando L.

    Historically, the primary justification for building wide-area transmission lines in the US and around the world has been based on reliability and economic criteria. Today, the influence of renewable portfolio standards (RPS), Environmental Protection Agency (EPA) regulations, transmission needs, load diversity, and grid flexibility requirements drives interest in high capacity wide-area transmission. By making use of an optimization model to perform long-term (15 years) co-optimized generation and transmission expansion planning, this work explored the benefits of increasing transmission capacity between the US Eastern and Western Interconnections under different policy and futures assumptions. The model assessed tradeoffs between investments in cross-interconnection HVDC transmission, AC transmission needs within each interconnection, generation investment costs, and operational costs, while satisfying different policy compliance constraints. Operational costs were broken down into the following market products: energy, up-/down regulation reserve, and contingency reserve. In addition, the system operating flexibility requirements were modeled as a function of net-load variability so that the flexibility of the non-wind/non-solar resources increases with increased wind and solar investment. In addition, planning reserve constraints are imposed under the condition that they be deliverable to the load. Thus, the model allows existing and candidate generation resources for both operating reserves and deliverable planning reserves to be shared throughout the interconnections, a feature which significantly drives identification of least-cost investments. This model is used with a 169-bus representation of the North American power grid to design four different high-capacity wide-area transmission infrastructures. Results from this analysis suggest that, under policy that imposes a high-renewable future, the benefits of high capacity transmission between the Eastern and

  14. A leader-followers model of transmission augmentation for considering strategic behaviours of generating companies in energy markets

    International Nuclear Information System (INIS)

    Hesamzadeh, M.R.; Hosseinzadeh, N.; Wolfs, P.J.

    2010-01-01

    This paper suggests an integrated mathematical framework developed based on the leader-followers game for augmentation of transmission networks. Transmission Network Service Provider moves first and designs the horizon year transmission system. Generating Companies compete for having the highest share from the energy market and they find their equilibrium point using the Nash equilibrium concept. Finally, Market Management Company receives the planning schedule of transmission system and the energy offer prices and clears the market. In addition to the exact mathematical modelling of the interested players of transmission planning problem, the methodology can design the future transmission system not only for improving the system social welfare but also for encouraging competition among horizon year generating companies. (author)

  15. Customer-focused planning: Beyond integrated resource planning

    International Nuclear Information System (INIS)

    Hastings, P.C.

    1992-01-01

    Integrated resource planning (IRP) evolved from the growing recognition by utilities and regulators that efforts to influence the use of electricity by customers could be more cost-effective than simply expanding the generation system. Improvements in IRP methodology are taking many different forms. One major effort is to move planning closer to the customer. Customer-focused planning (CFP) starts with customer values and uses these to drive decision-making within the utility. CFP is process- rather than product- oriented and typically operates at the bulk power system level. Options available to meet customer needs include electricity, alternative fuels, capital substitution, and end-use management or control. The customer selects the option(s) based on a value set that typically includes safety, reliability, convenience, and cost. There are also four possible levels of decision-making: the end-use; customer/power meter; transmission/distribution interface; and the utility bulk power system. Challenges of implementing CFP include identifying customer wants, needs, and values; integration of utility planning efforts; and the dynamics of the CFP process, in which costs can change with each modification of the transmission and distribution system. Two examples of recent moves toward CFP at Central Maine Power are reviewed. 2 refs., 1 fig

  16. Discrete PSO algorithm based optimization of transmission lines loading in TNEP problem

    International Nuclear Information System (INIS)

    Shayeghi, H.; Mahdavi, M.; Bagheri, A.

    2010-01-01

    Transmission network expansion planning (TNEP) is a basic part of power system planning that determines where, when and how many new transmission lines should be added to the network. Up till now, various methods have been presented to solve the static transmission network expansion planning (STNEP) problem. But in all of these methods, lines adequacy rate has not been considered at the end of planning horizon, i.e. expanded network misses adequacy after some times and needs to be expanded again. In this paper, expansion planning has been implemented by merging lines loading parameter in the STNEP and inserting investment cost into the fitness function constraints using discrete particle swarm optimization (DPSO) algorithm. Expanded network will possess a maximum adequacy to provide load demand and also the transmission lines overloaded later. The proposed idea has been tested on the Garvers network and an actual transmission network of the Azerbaijan regional electric company, Iran, and the results are compared with the decimal codification genetic algorithm (DCGA) technique. The results evaluation shows that the network will possess maximum efficiency economically. Also, it is shown that precision and convergence speed of the proposed DPSO based method for the solution of the STNEP problem is superior to DCGA approach.

  17. Scenario planning.

    Science.gov (United States)

    Enzmann, Dieter R; Beauchamp, Norman J; Norbash, Alexander

    2011-03-01

    In facing future developments in health care, scenario planning offers a complementary approach to traditional strategic planning. Whereas traditional strategic planning typically consists of predicting the future at a single point on a chosen time horizon and mapping the preferred plans to address such a future, scenario planning creates stories about multiple likely potential futures on a given time horizon and maps the preferred plans to address the multiple described potential futures. Each scenario is purposefully different and specifically not a consensus worst-case, average, or best-case forecast; nor is scenario planning a process in probabilistic prediction. Scenario planning focuses on high-impact, uncertain driving forces that in the authors' example affect the field of radiology. Uncertainty is the key concept as these forces are mapped onto axes of uncertainty, the poles of which have opposed effects on radiology. One chosen axis was "market focus," with poles of centralized health care (government control) vs a decentralized private market. Another axis was "radiology's business model," with one pole being a unified, single specialty vs a splintered, disaggregated subspecialty. The third axis was "technology and science," with one pole representing technology enabling to radiology vs technology threatening to radiology. Selected poles of these axes were then combined to create 3 scenarios. One scenario, termed "entrepreneurialism," consisted of a decentralized private market, a disaggregated business model, and threatening technology and science. A second scenario, termed "socialized medicine," had a centralized market focus, a unified specialty business model, and enabling technology and science. A third scenario, termed "freefall," had a centralized market focus, a disaggregated business model, and threatening technology and science. These scenarios provide a range of futures that ultimately allow the identification of defined "signposts" that can

  18. Energy planning and management plan

    International Nuclear Information System (INIS)

    1996-01-01

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration's final draft and environmental impact statement, and Energy Planning and Management Program

  19. High voltage transmission of electrical energy over long distances

    Energy Technology Data Exchange (ETDEWEB)

    Tewari, S W

    1962-07-01

    Technical aspects of ac transmission lines, additional means of improving stability ac transmisson lines, insulation problems, ac transmission by cables, high voltage dc transmission, advantages of dc over ac transmission, disadvantages of dc transmission, use of underground cables for dc transmission, history of the development of conversion equipment; transmission schemes adopted on Gotland Island, Sweden; and economics of ac and dc transmission are discussed.

  20. Telecommunications network modelling, planning and design

    CERN Document Server

    Evans, Sharon

    2003-01-01

    Telecommunication Network Modelling, Planning and Design addresses sophisticated modelling techniques from the perspective of the communications industry and covers some of the major issues facing telecommunications network engineers and managers today. Topics covered include network planning for transmission systems, modelling of SDH transport network structures and telecommunications network design and performance modelling, as well as network costs and ROI modelling and QoS in 3G networks.

  1. Proceedings of the North American Transmission and Distribution Conference and Expo. CD ed.

    International Nuclear Information System (INIS)

    2005-01-01

    This conference provided power suppliers with technology information regarding the transmission and distribution marketplace. It profiled industry solutions, information and education regarding the latest products and technologies to help utility professionals in their design, specifications, planning and reliability efforts. More than 1200 decision makers, suppliers and utility professionals attended the conference, including electrical utility chief executive officers, presidents, operations managers, billing experts, customer care facility managers, system planners, transmission/distribution managers, asset management, system operations management, and engineering consultants. Vendors also demonstrated the latest equipment, software and technology for the transmission and distribution market. Transmission was the focal point of core business activities with emphasis on energy management, new technologies, operations, maintenance, and planning and design. Topics of discussion ranged from load response strategies, metering systems, modernization of large industrial plants for interconnection with utilities, streetlight management systems, improvements to circuit utilization, energy fraud detection, power surge protection, de-icing systems, cyber security, and the Canadian electricity workforce. tabs., figs

  2. Harmonics in transmission power systems

    DEFF Research Database (Denmark)

    Wiechowski, Wojciech Tomasz

    . The comparison shows that results obtained used both types of the cores are the same, so it is concluded that both cores can be used for harmonic measurements. Low-inductance resistors are introduced in the secondary circuits, in series with the metering and protective relaying. On those resistors, the harmonic......Some time ago, Energinet.dk, the Transmission System Operator of the 150 kV and 400 kV transmission network in Denmark, had experienced operational malfunctions of some of the measuring and protection equipment. Also an overloading of a harmonic filter has been reported, and therefore, a need...... end only so the ground is not used as a return path. A way to reduce the capacitive coupling is to provide shielding. Harmonic currents are measured using the conventional inductive voltage transformers. Both protective and metering cores were compared if they could be used for harmonic measurements...

  3. Transmission X-ray mirror

    International Nuclear Information System (INIS)

    Lairson, B.M.; Bilderback, D.H.

    1982-01-01

    Transmission X-ray mirrors have been made from 400 A to 10 000 A thick soap films and have been shown to have novel properties. Using grazing angles of incidence, low energy X-rays were reflected from the front surface while more energetic X-rays were transmitted through the mirror largely unattenuated. A wide bandpass monochromator was made from a silicon carbide mirror followed by a soap film transmission mirror and operated in the white beam at the cornell High Energy Synchrotron Source (CHESS). Bandpasses of ΔE/E=12% to 18% were achieved at 13 keV with peak efficiencies estimated to be between 55% and 75%, respectively. Several wide angle scattering photographs of stretched polyethylene and a phospholipid were obtained in 10 s using an 18% bandpass. (orig.)

  4. Downlink Transmission of Short Packets

    DEFF Research Database (Denmark)

    Trillingsgaard, Kasper Fløe; Popovski, Petar

    2017-01-01

    Cellular wireless systems rely on frame-based transmissions. The frame design is conventionally based on heuristics, consisting of a frame header and a data part. The frame header contains control information that provides pointers to the messages within the data part. In this paper, we revisit...... the principles of frame design and show the impact of the new design in scenarios that feature short data packets, which are central to various 5G and Internet of Things applications. We~treat framing for downlink transmission in an AWGN broadcast channel with $K$ users, where the sizes of the messages....... This requires changes in the way control information is sent, and it requires that the users need to spend power decoding other messages, thereby increasing the average power consumption. We~show that the common heuristic design is only one point on a curve that represents the tradeoff between latency and power...

  5. Probabilistic costing of transmission services

    International Nuclear Information System (INIS)

    Wijayatunga, P.D.C.

    1992-01-01

    Costing of transmission services of electrical utilities is required for transactions involving the transport of energy over a power network. The calculation of these costs based on Short Run Marginal Costing (SRMC) is preferred over other methods proposed in the literature due to its economic efficiency. In the research work discussed here, the concept of probabilistic costing of use-of-system based on SRMC which emerges as a consequence of the uncertainties in a power system is introduced using two different approaches. The first approach, based on the Monte Carlo method, generates a large number of possible system states by simulating random variables in the system using pseudo random number generators. A second approach to probabilistic use-of-system costing is proposed based on numerical convolution and multi-area representation of the transmission network. (UK)

  6. Exploiting a Transmission Grating Spectrometer

    Energy Technology Data Exchange (ETDEWEB)

    Ronald E. Bell

    2004-12-08

    The availability of compact transmission grating spectrometers now allows an attractive and economical alternative to the more familiar Czerny-Turner configuration for many high-temperature plasma applications. Higher throughput is obtained with short focal length refractive optics and stigmatic imaging. Many more spectra can be obtained with a single spectrometer since smaller, more densely packed optical input fibers can be used. Multiple input slits, along with a bandpass filter, can be used to maximize the number of spectra per detector, providing further economy. Curved slits can correct for the strong image curvature of the short focal length optics. Presented here are the governing grating equations for both standard and high-dispersion transmission gratings, defining dispersion, image curvature, and desired slit curvature, that can be used in the design of improved plasma diagnostics.

  7. Transmission usage cost allocation schemes

    International Nuclear Information System (INIS)

    Abou El Ela, A.A.; El-Sehiemy, R.A.

    2009-01-01

    This paper presents different suggested transmission usage cost allocation (TCA) schemes to the system individuals. Different independent system operator (ISO) visions are presented using the proportional rata and flow-based TCA methods. There are two proposed flow-based TCA schemes (FTCA). The first FTCA scheme generalizes the equivalent bilateral exchanges (EBE) concepts for lossy networks through two-stage procedure. The second FTCA scheme is based on the modified sensitivity factors (MSF). These factors are developed from the actual measurements of power flows in transmission lines and the power injections at different buses. The proposed schemes exhibit desirable apportioning properties and are easy to implement and understand. Case studies for different loading conditions are carried out to show the capability of the proposed schemes for solving the TCA problem. (author)

  8. Exploiting a Transmission Grating Spectrometer

    International Nuclear Information System (INIS)

    Bell, Ronald E.

    2004-01-01

    The availability of compact transmission grating spectrometers now allows an attractive and economical alternative to the more familiar Czerny-Turner configuration for many high-temperature plasma applications. Higher throughput is obtained with short focal length refractive optics and stigmatic imaging. Many more spectra can be obtained with a single spectrometer since smaller, more densely packed optical input fibers can be used. Multiple input slits, along with a bandpass filter, can be used to maximize the number of spectra per detector, providing further economy. Curved slits can correct for the strong image curvature of the short focal length optics. Presented here are the governing grating equations for both standard and high-dispersion transmission gratings, defining dispersion, image curvature, and desired slit curvature, that can be used in the design of improved plasma diagnostics

  9. Transmission of Influenza A Viruses

    Science.gov (United States)

    Neumann, Gabriele; Kawaoka, Yoshihiro

    2015-01-01

    Influenza A viruses cause respiratory infections that range from asymptomatic to deadly in humans. Widespread outbreaks (pandemics) are attributable to ‘novel’ viruses that possess a viral hemagglutinin (HA) gene to which humans lack immunity. After a pandemic, these novel viruses form stable virus lineages in humans and circulate until they are replaced by other novel viruses. The factors and mechanisms that facilitate virus transmission among hosts and the establishment of novel lineages are not completely understood, but the HA and basic polymerase 2 (PB2) proteins are thought to play essential roles in these processes by enabling avian influenza viruses to infect mammals and replicate efficiently in their new host. Here, we summarize our current knowledge of the contributions of HA, PB2, and other viral components to virus transmission and the formation of new virus lineages. PMID:25812763

  10. Unpacking the great transmission debate

    Science.gov (United States)

    Denning, Kathryn

    2010-12-01

    The debate about the wisdom of sending interstellar transmissions is well-known to those involved in SETI, and frustrating for many. Its tendency towards intractability is a result of multiple factors, including: different models of the scientist's role as citizen and/or leader; disparate ideas about society's readiness to cope with frontier science; variable political substrates, particularly ideas concerning individual freedom and state control; competing ideologies of globalization; and the perceived relative risks and benefits of contact. (Variations in the latter, i.e. assessments of the risks and benefits of contact, derive partly from different thinking styles, including tolerance for risk, and partly from inferences based upon episodes of biological and cultural contact on Earth.) Unpacking the debate into its components may be of use to those debating policy about SETI transmissions, or at the very least, help keep in focus what, precisely, the perennial arguments are really about.

  11. Transmission efficiency of neutron guide tube with alignment errors

    International Nuclear Information System (INIS)

    Kawabata, Yuji; Suzuki, Masatoshi; Sakamoto, Masanobu; Harami, Taikan; Takahashi, Hidetake; Onishi, Nobuaki

    1990-01-01

    The experimental studies on the neutron transmission efficiencies of neutron guide tubes were carried out by using thermal neutrons from the JAERI electron linac. The neutron guide tube facility on a large scale have been planned on the reconstructed JRR-3 in JAERI. The neutron efficiencies of the 1/10 scale neutron guide tube, which is 2 mm width and 1.8 m length, with and without appreciable alignment errors were studied to evaluate the efficiencies of the planned ones. Calculated results by the Neutron Guide Tube Analysis Code 'NEUGT' were also assessed by these neutron experiments. The experimental results agree well with the calculated results by 'NEUGT' even with alignment errors. From this experimental study, the efficiency of the planned neutron guide tubes is estimated to be good enough for the neutron beam experiments. (author)

  12. Flight Planning

    Science.gov (United States)

    1991-01-01

    Seagull Technology, Inc., Sunnyvale, CA, produced a computer program under a Langley Research Center Small Business Innovation Research (SBIR) grant called STAFPLAN (Seagull Technology Advanced Flight Plan) that plans optimal trajectory routes for small to medium sized airlines to minimize direct operating costs while complying with various airline operating constraints. STAFPLAN incorporates four input databases, weather, route data, aircraft performance, and flight-specific information (times, payload, crew, fuel cost) to provide the correct amount of fuel optimal cruise altitude, climb and descent points, optimal cruise speed, and flight path.

  13. Midwest Transmission Workshop II Summary

    Energy Technology Data Exchange (ETDEWEB)

    Kevin Bryan

    2002-12-05

    OAK-B135 After introductions of all participants, Abby Arnold, RESOLVE, reviewed the purpose of the meeting and the agenda. The purpose of the workshop was to share the results of the Midwest Independent System Operator (MISO) scenario development for wind and other fuel sources and the corresponding implications for transmission throughout the MISO control area. The workshop agenda is included in Attachment A.

  14. Transmission and distribution electrical engineering

    CERN Document Server

    Bayliss, Colin

    2003-01-01

    This comprehensive treatment of the theory and practice encountered in the installation and design of transmission and distribution systems for electrical power has been updated and revised to provide the project engineer with all the latest, relevant information to design and specify the correct system for a particular application.Thoroughly updated and revised to include latest developmentsLearn from and Author with extensive experience in managing international projectsFind out the reasoning and implicatons behind the different specifications and methods

  15. Integrated Transmission and Distribution Control

    Energy Technology Data Exchange (ETDEWEB)

    Kalsi, Karanjit [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fuller, Jason C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tuffner, Francis K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lian, Jianming [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Zhang, Wei [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Marinovici, Laurentiu D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fisher, Andrew R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Chassin, Forrest S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hauer, Matthew L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-01-01

    Distributed, generation, demand response, distributed storage, smart appliances, electric vehicles and renewable energy resources are expected to play a key part in the transformation of the American power system. Control, coordination and compensation of these smart grid assets are inherently interlinked. Advanced control strategies to warrant large-scale penetration of distributed smart grid assets do not currently exist. While many of the smart grid technologies proposed involve assets being deployed at the distribution level, most of the significant benefits accrue at the transmission level. The development of advanced smart grid simulation tools, such as GridLAB-D, has led to a dramatic improvement in the models of smart grid assets available for design and evaluation of smart grid technology. However, one of the main challenges to quantifying the benefits of smart grid assets at the transmission level is the lack of tools and framework for integrating transmission and distribution technologies into a single simulation environment. Furthermore, given the size and complexity of the distribution system, it is crucial to be able to represent the behavior of distributed smart grid assets using reduced-order controllable models and to analyze their impacts on the bulk power system in terms of stability and reliability.

  16. METHODS OF POLYMODAL INFORMATION TRANSMISSION

    Directory of Open Access Journals (Sweden)

    O. O. Basov

    2015-03-01

    Full Text Available The research results upon the application of the existing information transmission methods in polymodal info communication systems are presented herein. The analysis of the existing commutation ways and multiplexing schemes has revealed that modern means of telecommunication are capable of providing polymodal information delivery with the required quality to the customer correspondent terminal. Under these conditions substantial capacity resource consumption in the data transmission networks with a simultaneous static time multiplexing is required, however, it is easier to achieve the modality synchronization within that kind of an infrastructure. The data networks with a static time multiplexing demand employing more sophisticated supporting algorithms of the guaranteed data blocks delivery quality. However, due to the stochastic data blocks delays modality synchronizing during the off-line processing is more difficult to provide. Nowadays there are objective preconditions for a data networking realization which is invariable to the applied transmission technology. This capability is defined by a wide (person-to-person application of the optical technologies in the transport infrastructure of the polymodal info communication systems. In case of the availability of the customer terminal and networking functioning matching mode it becomes possible to organize channels in the latter which can adaptively select the most effective networking technology according to the current volume allocation and modality types in the messages.

  17. Wave transmission in nonlinear lattices

    International Nuclear Information System (INIS)

    Hennig, D.; Tsironis, G.P.

    1999-01-01

    The interplay of nonlinearity with lattice discreteness leads to phenomena and propagation properties quite distinct from those appearing in continuous nonlinear systems. For a large variety of condensed matter and optics applications the continuous wave approximation is not appropriate. In the present review we discuss wave transmission properties in one dimensional nonlinear lattices. Our paradigmatic equations are discrete nonlinear Schroedinger equations and their study is done through a dynamical systems approach. We focus on stationary wave properties and utilize well known results from the theory of dynamical systems to investigate various aspects of wave transmission and wave localization. We analyze in detail the more general dynamical system corresponding to the equation that interpolates between the non-integrable discrete nonlinear Schroedinger equation and the integrable Albowitz-Ladik equation. We utilize this analysis in a nonlinear Kronig-Penney model and investigate transmission and band modification properties. We discuss the modifications that are effected through an electric field and the nonlinear Wannier-Stark localization effects that are induced. Several applications are described, such as polarons in one dimensional lattices, semiconductor superlattices and one dimensional nonlinear photonic band gap systems. (Copyright (c) 1999 Elsevier Science B.V., Amsterdam. All rights reserved.)

  18. Coiled transmission line pulse generators

    Science.gov (United States)

    McDonald, Kenneth Fox

    2010-11-09

    Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

  19. Automatic Transmission Of Liquid Nitrogen

    Directory of Open Access Journals (Sweden)

    Sumedh Mhatre

    2015-08-01

    Full Text Available Liquid Nitrogen is one of the major substance used as a chiller in industry such as Ice cream factory Milk Diary Storage of blood sample Blood Bank etc. It helps to maintain the required product at a lower temperature for preservation purpose. We cannot fully utilise the LN2 so practically if we are using 3.75 litre LN2 for a single day then around 12 of LN2 450 ml is wasted due to vaporisation. A pressure relief valve is provided to create a pressure difference. If there is no pressure difference between the cylinder carrying LN2 and its surrounding it will results in damage of container as well as wastage of LN2.Transmission of LN2 from TA55 to BA3 is carried manually .So care must be taken for the transmission of LN2 in order to avoid its wastage. With the help of this project concept the transmission of LN2 will be carried automatically so as to reduce the wastage of LN2 in case of manual operation.

  20. Fungal transmission of plant viruses.

    Science.gov (United States)

    Campbell, R N

    1996-01-01

    Thirty soilborne viruses or virus-like agents are transmitted by five species of fungal vectors. Ten polyhedral viruses, of which nine are in the family Tombusviridae, are acquired in the in vitro manner and do not occur within the resting spores of their vectors, Olpidium brassicae and O. bornovanus. Fungal vectors for other viruses in the family should be sought even though tombusviruses are reputed to be soil transmitted without a vector. Eighteen rod-shaped viruses belonging to the furo- and bymovirus groups and to an unclassified group are acquired in the in vivo manner and survive within the resting spores of their vector, O. brassicae, Polymyxa graminis, P. betae, and Spongospora subterranea. The viral coat protein has an essential role in in vitro transmission. With in vivo transmission a site in the coat protein-read through protein (CP-RT) of beet necrotic yellow vein furovirus determines vector transmissibility as does a site in a similar 98-kDa polyprotein of barley mild mosaic bymovirus. The mechanisms by which virions move (or are moved) into and out of the protoplasm of zoospores or of thalli needs study.

  1. Design, Control and Application of Modular Multilevel Converters for HVDC Transmission Systems

    DEFF Research Database (Denmark)

    Sharifabadi, Kamran; Harnefors, Lennart; Nee, Hans-Peter

    distinct parts, the first offers an overview of MMC technology, including information on converter component sizing, Control and Communication, Protection and Fault Management, and Generic Modelling and Simulation. The second covers the applications of MMC in offshore WPP, including planning, technical......Design, Control and Application of Modular Multilevel Converters for HVDC Transmission Systems is a comprehensive guide to semiconductor technologies applicable for MMC design, component sizing control, modulation, and application of the MMC technology for HVDC transmission. Separated into three...

  2. Experimental comparison between speech transmission index, rapid speech transmission index, and speech intelligibility index.

    Science.gov (United States)

    Larm, Petra; Hongisto, Valtteri

    2006-02-01

    During the acoustical design of, e.g., auditoria or open-plan offices, it is important to know how speech can be perceived in various parts of the room. Different objective methods have been developed to measure and predict speech intelligibility, and these have been extensively used in various spaces. In this study, two such methods were compared, the speech transmission index (STI) and the speech intelligibility index (SII). Also the simplification of the STI, the room acoustics speech transmission index (RASTI), was considered. These quantities are all based on determining an apparent speech-to-noise ratio on selected frequency bands and summing them using a specific weighting. For comparison, some data were needed on the possible differences of these methods resulting from the calculation scheme and also measuring equipment. Their prediction accuracy was also of interest. Measurements were made in a laboratory having adjustable noise level and absorption, and in a real auditorium. It was found that the measurement equipment, especially the selection of the loudspeaker, can greatly affect the accuracy of the results. The prediction accuracy of the RASTI was found acceptable, if the input values for the prediction are accurately known, even though the studied space was not ideally diffuse.

  3. 47 CFR 25.212 - Narrowband analog transmissions, digital transmissions, and video transmissions in the GSO Fixed...

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Narrowband analog transmissions, digital transmissions, and video transmissions in the GSO Fixed-Satellite Service. 25.212 Section 25.212 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS...

  4. WECC Variable Generation Planning Reference Book: Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Makarov, Yuri V.; Du, Pengwei; Etingov, Pavel V.; Ma, Jian; Vyakaranam, Bharat

    2013-05-13

    The document titled “WECC Variable Generation Planning Reference Book”. This book is divided into two volumes; one is the main document (volume 1)and the other is appendices (volume 2). The main document is a collection of the best practices and the information regarding the application and impact of variables generation on power system planning. This volume (appendices) has additional information on the following topics: Probabilistic load flow problems. 2. Additional useful indices. 3. high-impact low-frequency (HILF) events. 4. Examples of wide-area nomograms. 5. Transmission line ratings, types of dynamic rating methods. 6. Relative costs per MW-km of different electric power transmission technologies. 7. Ultra-high voltage (UHV) transmission. 8.High voltage direct current (VSC-HVDC). 9. HVDC. 10. Rewiring of existing transmission lines. 11. High-temperature low sag (HTLS) conductors. 12. The direct method and energy functions for transient stability analysis in power systems. 13.Blackouts caused by voltage instability. 14. Algorithm for parameter continuation predictor-corrector methods. 15. Approximation techniques available for security regions. 16. Impacts of wind power on power system small signals stability. 17. FIDVR. 18. FACTS. 19. European planning standard and practices. 20. International experience in wind and solar energy sources. 21. Western Renewable Energy Zones (WREZ). 22. various energy storage technologies. 23. demand response. 24. BA consolidation and cooperation options. 25. generator power management requirements and 26. European planning guidelines.

  5. Transmission and archiving of digitalised radiography

    International Nuclear Information System (INIS)

    Zscherpel, U.; Rose, P.; Kaestner, R.; Mayer, R.; Heinrich, W.; Petesch, M.

    1995-01-01

    The 'TRENDT' research project is concerned with the transmission and archiving of digitalised radiography and with the application of wide band transmission networks in nondestructive material testing. (orig./HP) [de

  6. European bat Lyssavirus transmission among cats, Europe.

    Science.gov (United States)

    Dacheux, Laurent; Larrous, Florence; Mailles, Alexandra; Boisseleau, Didier; Delmas, Olivier; Biron, Charlotte; Bouchier, Christiane; Capek, Isabelle; Muller, Michel; Ilari, Frédéric; Lefranc, Tanguy; Raffi, François; Goudal, Maryvonne; Bourhy, Hervé

    2009-02-01

    We identified 2 cases of European bat lyssavirus subtype 1 transmission to domestic carnivores (cats) in France. Bat-to-cat transmission is suspected. Low amounts of virus antigen in cat brain made diagnosis difficult.

  7. Theory of transmission through disordered superlattices

    DEFF Research Database (Denmark)

    Wacker, Andreas; Hu, Ben Yu-Kuang

    1999-01-01

    We derive a theory for transmission through disordered finite superlattices in which the interface roughness scattering is treated by disorder averaging. This procedure permits efficient calculation of the transmission through samples with large cross sections. These calculations can be performed...

  8. Design, control and application of modular multilevel converters for HVDC transmission systems

    CERN Document Server

    Sharifabadi, Kamran; Nee, Hans-Peter; Norrga, Staffan; Teodorescu, Remus

    2016-01-01

    Design, Control and Application of Modular Multilevel Converters for HVDC Transmission Systems is a comprehensive guide to semiconductor technologies applicable for MMC design, component sizing control, modulation, and application of the MMC technology for HVDC transmission. Separated into three distinct parts, the first offers an overview of MMC technology, including information on converter component sizing, Control and Communication, Protection and Fault Management, and Generic Modelling and Simulation. The second covers the applications of MMC in offshore WPP, including planning, technical and economic requirements and optimization options, fault management, dynamic and transient stability. Finally, the third chapter explores the applications of MMC in HVDC transmission and Multi Terminal configurations, including Supergrids.

  9. Final Technical Report: Integrated Distribution-Transmission Analysis for Very High Penetration Solar PV

    Energy Technology Data Exchange (ETDEWEB)

    Palmintier, Bryan [NREL (National Renewable Energy Laboratory (NREL), Golden, CO (United States)); Hale, Elaine [NREL (National Renewable Energy Laboratory (NREL), Golden, CO (United States)); Hansen, Timothy M. [NREL (National Renewable Energy Laboratory (NREL), Golden, CO (United States)); Jones, Wesley [NREL (National Renewable Energy Laboratory (NREL), Golden, CO (United States)); Biagioni, David [NREL (National Renewable Energy Laboratory (NREL), Golden, CO (United States)); Baker, Kyri [NREL (National Renewable Energy Laboratory (NREL), Golden, CO (United States)); Wu, Hongyu [NREL (National Renewable Energy Laboratory (NREL), Golden, CO (United States)); Giraldez, Julieta [NREL (National Renewable Energy Laboratory (NREL), Golden, CO (United States)); Sorensen, Harry [NREL (National Renewable Energy Laboratory (NREL), Golden, CO (United States)); Lunacek, Monte [NREL (National Renewable Energy Laboratory (NREL), Golden, CO (United States)); Merket, Noel [NREL (National Renewable Energy Laboratory (NREL), Golden, CO (United States)); Jorgenson, Jennie [NREL (National Renewable Energy Laboratory (NREL), Golden, CO (United States)); Hodge, Bri-Mathias [NREL (National Renewable Energy Laboratory (NREL), Golden, CO (United States))

    2016-01-29

    Transmission and distribution simulations have historically been conducted separately, echoing their division in grid operations and planning while avoiding inherent computational challenges. Today, however, rapid growth in distributed energy resources (DERs)--including distributed generation from solar photovoltaics (DGPV)--requires understanding the unprecedented interactions between distribution and transmission. To capture these interactions, especially for high-penetration DGPV scenarios, this research project developed a first-of-its-kind, high performance computer (HPC) based, integrated transmission-distribution tool, the Integrated Grid Modeling System (IGMS). The tool was then used in initial explorations of system-wide operational interactions of high-penetration DGPV.

  10. BC Transmission Corporation : working towards a smarter grid

    Energy Technology Data Exchange (ETDEWEB)

    Morison, K. [British Columbia Transmission Corp., Vancouver, BC (Canada)

    2009-07-01

    This presentation discussed smart grid initiatives implemented as part of the British Columbia Transmission Corporation's (BCTC) transmission technology roadmap. The BCTC system is comprised of 18,000 km of transmission lines with 292 stations and 2 system control centers. BCTC is now aiming to maximize transfer capability and plan transmission system expansions for electricity security and increased capacity. BCTC's smart grid program was also designed to address emerging concerns over sustainability and the environmental impacts of electricity generation. The smart grid program will reduce system congestion, enable the integration of renewable energy, and be used as part of a broader risk assessment strategy. The program includes the use of power electronics, advanced composites and nano-materials, and field work robotics. Advance control centre technologies and synchrophasors will be used to enable wide area control and security assessment. BCTC's other smart grid initiatives include the use of smart equipment monitoring and remote sensing technologies. It was concluded that information and grid-based technologies will increase the efficiency, reliability, and flexibility of the electricity delivery infrastructure. tabs., figs.

  11. Trends in coordination and transmission service

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    Investor-owned utilities increasingly are taking significant advantage of the benefits available from coordination transactions and transmission service. This chapter describes Edison Electric Institute (EEI's) estimate as to the growth in sales-for-resale (including coordination service) over the past two decades. With respect to transmission service, this chapter describes the significant growth in both the level of transmission service and the number of transmission agreements

  12. Orbiting transmission source for positron tomography

    International Nuclear Information System (INIS)

    Huesman, R.H.; Derenzo, S.E.; Cahoon, J.L.; Geyer, A.B.; Moses, W.W.; Uber, D.C.; Vuletich, T.; Budinger, T.F.

    1988-01-01

    Accidental suppression and effective data rates have been measured for the orbiting transmission source as implemented in the Donner 600-Crystal Positron Tomograph. A mechanical description of the orbiting source and a description of the electronics used to discard scattered and accidental events is included. Since accidental coincidences were the rate-limiting factor in transmission data acquisition, the new method allows us to acquire sufficient transmission data in a shorter time with a more active transmission source

  13. HVDC transmission from nuclear power plant

    International Nuclear Information System (INIS)

    Yoshida, Yukio; Takenaka, Kiyoshi; Taniguchi, Haruto; Ueda, Kiyotaka

    1980-01-01

    HVDC transmission directly from a nuclear power plant is expected as one of the bulk power transmission systems from distant power generating area. Successively from the analysis of HVDC transmission from BWR-type nuclear power plant, this report discusses dynamic response characteristics of HVDC transmission (double poles, two circuits) from PWR type nuclear power plant due to dc-line faults (DC-1LG, 2LG) and ac-line faults (3LG) near inverter station. (author)

  14. Topics on Electricity Transmission Pricing

    Energy Technology Data Exchange (ETDEWEB)

    Bjoerndal, Mette

    2000-02-01

    Within the last decade we have experienced deregulation of several industries, such as airlines, telecommunications and the electric utility industry, the last-mentioned being the focus of this work. Both the telecommunications and the electricity sector depend on network facilities, some of which are still considered as natural monopolies. In these industries, open network access is regarded as crucial in order to achieve the gains from increased competition, and transmission tariffs are important in implementing this. Based on the Energy Act that was introduced in 1991, Norway was among the first countries to restructure its electricity sector. On the supply side there are a large number of competing firms, almost exclusively hydro plants, with a combined capacity of about 23000 MW, producing 105-125 TWh per year, depending on the availability of water. Hydro plants are characterized by low variable costs of operation, however since water may be stored in dams, water has an opportunity cost, generally known as the water value, which is the shadow price of water when solving the generator's inter temporal profit maximization problem. Water values are the main factor of the producers' short run marginal cost. Total consumption amounts to 112-117 TWh a year, and consumers, even households, may choose their electricity supplier independent of the local distributor to which the customer is connected. In fact, approximately 10% of the households have actually changed supplier. The web-site www.konkurransetilsynet.no indicates available contracts, and www.dinside.no provides an ''energy-calculator'' where one can check whether it is profitable to switch supplier. If a customer buys energy from a remote supplier, the local distributor only provides transportation facilities for the energy and is compensated accordingly. Transmission and distribution have remained monopolized and regulated by the Norwegian Water Resources and Energy

  15. Topics in Electricity Transmission Pricing

    Energy Technology Data Exchange (ETDEWEB)

    Bjoerndal, Mette

    2000-02-01

    Within the last decade we have experienced deregulation of several industries, such as airlines, telecommunications and the electric utility industry, the last-mentioned being the focus of this work. Both the telecommunications and the electricity sector depend on network facilities, some of which are still considered as natural monopolies. In these industries, open network access is regarded as crucial in order to achieve the gains from increased competition, and transmission tariffs are important in implementing this. Based on the Energy Act that was introduced in 1991, Norway was among the first countries to restructure its electricity sector. On the supply side there are a large number of competing firms, almost exclusively hydro plants, with a combined capacity of about 23000 MW, producing 105-125 TWh per year, depending on the availability of water. Hydro plants are characterized by low variable costs of operation, however since water may be stored in dams, water has an opportunity cost, generally known as the water value, which is the shadow price of water when solving the generator's inter temporal profit maximization problem. Water values are the main factor of the producers' short run marginal cost. Total consumption amounts to 112-117 TWh a year, and consumers, even households, may choose their electricity supplier independent of the local distributor to which the customer is connected. In fact, approximately 10% of the households have actually changed supplier. The web-site www.konkurransetilsynet.no indicates available contracts, and www.dinside.no provides an ''energy-calculator'' where one can check whether it is profitable to switch supplier. If a customer buys energy from a remote supplier, the local distributor only provides transportation facilities for the energy and is compensated accordingly. Transmission and distribution have remained monopolized and regulated by the Norwegian Water Resources and Energy

  16. Topics on Electricity Transmission Pricing

    International Nuclear Information System (INIS)

    Bjoerndal, Mette

    2000-02-01

    Within the last decade we have experienced deregulation of several industries, such as airlines, telecommunications and the electric utility industry, the last-mentioned being the focus of this work. Both the telecommunications and the electricity sector depend on network facilities, some of which are still considered as natural monopolies. In these industries, open network access is regarded as crucial in order to achieve the gains from increased competition, and transmission tariffs are important in implementing this. Based on the Energy Act that was introduced in 1991, Norway was among the first countries to restructure its electricity sector. On the supply side there are a large number of competing firms, almost exclusively hydro plants, with a combined capacity of about 23000 MW, producing 105-125 TWh per year, depending on the availability of water. Hydro plants are characterized by low variable costs of operation, however since water may be stored in dams, water has an opportunity cost, generally known as the water value, which is the shadow price of water when solving the generator's inter temporal profit maximization problem. Water values are the main factor of the producers' short run marginal cost. Total consumption amounts to 112-117 TWh a year, and consumers, even households, may choose their electricity supplier independent of the local distributor to which the customer is connected. In fact, approximately 10% of the households have actually changed supplier. The web-site www.konkurransetilsynet.no indicates available contracts, and www.dinside.no provides an ''energy-calculator'' where one can check whether it is profitable to switch supplier. If a customer buys energy from a remote supplier, the local distributor only provides transportation facilities for the energy and is compensated accordingly. Transmission and distribution have remained monopolized and regulated by the Norwegian Water Resources and Energy Directorate (NVE). To prevent cross

  17. HVDC transmission from isorated nuclear power plant

    International Nuclear Information System (INIS)

    Takenaka, Kiyoshi; Takasaki, Masahiro; Ichikawa, Tatemi; Hayashi, Toshiyuki

    1985-01-01

    HVDC transmission directly from nuclear power plant is considered as one of the patterns of long distance and large capacity transmission system. This reports considers two route HVDC transmission from PWR type nuclear power plant, and analyzes dynamic response characteristics due to bus fault, main protection failure and etc. using the AC-DC Power System Simulator. (author)

  18. Voluntary transmission access: The PSI proposal

    International Nuclear Information System (INIS)

    Norris, J.E.

    1990-01-01

    This article examines a proposal from PSI Energy, Inc. (formerly Public Service Company of Indiana) to allow open access to its power transmission facilities and the response of the Federal Energy Regulatory Commission's response to that proposal. The topics discussed include transmission tariffs, competition, market share, expansion of transmission capacity and its funding, and reciprocal agreements to provide similar service

  19. Gas development plan - Lithuania

    International Nuclear Information System (INIS)

    1993-10-01

    A detailed description of the plan for the development of gas utilization in Lithuania is presented. The plan is subdivided under the headings of gas supply, gas demand, gas transmission and distribution, economy and the organization of the gas sector in the country. The first phase of the project has been undertaken by a Danish firm in cooperation with the Lithuanian firm Lietuvos Dujos. The first aim was to clarify the problems that will arise in connection with this joint venture on developing the use of gas in Lithuania, focusing on existing gas supply and market conditions, the current flow control and metering and economic constraints. The organization of the gas sector in the country as it stands today is described and possible models for its future organization are discussed in addition to a strategy of implementation. Possible development trends are outlined and maximum/minimum demand scenarios are suggested. Subjects and areas related to the gas sector in Lithuania are identified for further investigation in the next phase. It is stated that Lithuania is at present undergoing a fast transformation towards a market economy and that the transfer of foreign currency has been liberalized. Only the pipeline from Minsk to Vilnius is open at present and provides the total supply of natural gas to Lithuania and Kalingrad, controlled by the Russian gas company, Lentransgas, on the basis of a gas purchase agreement regulated on a yearly basis. Other possible supply sources are the Danish part of the North Sea and the Norwegian offshore fields. (AB)

  20. [Heterosexual transmission of HIV infection

    Science.gov (United States)

    Coulaud, J P

    1993-02-01

    The AIDS epidemic has spread rapidly in Africa among the urban impoverished where multiple sexual partners and sexually transmitted diseases are common. Over 80% of the 9 million Africans who will develop AIDS before the year 2000 will have been contaminated sexually. Poverty, multiple sexual partners in the framework of prostitution, and drug addiction are responsible for rapid spread of HIV infection in Southeast Asia, the West India, and Brazil. Drug addiction has played a major role in diffusion of HIV into the general population of Europe and the US. Prevalence rates are much higher in sexually transmitted disease centers in France and the US than among blood donors or pregnant women. Sexually transmitted diseases and heterosexual transmission have been studied in Africas since diagnostic tests became available. Several studies, the majority conducted among prostitutes in Nairobi or Kinshasa and their clients, allow establishment of a list of sexually transmitted diseases associated with increased risk of seroconversion. Genital ulcers within the past 6 months presented a relative risk of 2-4 depending on the series. Urethral or cervical gonorrhea has a lower relative risk of 1.2 in most studies. Absence of circumcision was also a risk factor. Studies were subsequently conducted in Europe on factors favoring sexual transmission. 513 heterosexual couples together for a minimum duration of 18 months and an average of 38 months were included in the Multicenter European Study conducted in 10 centers in 9 countries. The "index" subject was male in 400 cases and female in 113. At entry into the study, 73 of 400 males (18.2%) and 10 of 113 females (8.8%) had already infected their partners. Duration of union, frequency of intercourse, mode of transmission of the index subject, and oral contraceptive use had no effect on risk of transmission. Factors increasing risk of infection included the severity of immunosuppression of the index subject, whether judged by

  1. [The control of vectorial transmission].

    Science.gov (United States)

    Silveira, Antônio Carlos; Dias, João Carlos Pinto

    2011-01-01

    Between 1950 and 1951, the first Prophylactic campaign against Chagas Diseases was carried on in Brazil by the so existing Serviço Nacional de Malária. The actions involving chemical vector control comprehended 74 municipalities along the Rio Grande Valley, between the States of São Paulo and Minas Gerais. Ever since, until 1975, the activities were performed according the availability of resources, being executed with more or less regularity and coverage. At that time, Chagas disease did no represent priority, in comparison with other endemic diseases prevalent in the Country. Even so, taking into account the accumulated data along those 25 years, the volume of work realized cannot be considered despicable. Nevertheless, it was few consistent, in terms of its impact on disease transmission. In 1975, with an additional injection of resources surpassed from the malaria program, plus the methodological systematization of the activities, and with the results of two extensive national inquiries (entomologic and serologic), the activities for vector control could be performed regularly, following two basic principles: interventions in always contiguous areas, progressively enlarged, and sustainability (continuity) of the activities, until being attained determined requirements and purpose previously established. Such actions and strategies lead into the exhaustion of the populations of the principal vector species, Triatoma infestans, no autochthonous and exclusively domiciliary, as well as the control of the domiciliary colonization of autochthonous species important to disease transmission. Vector transmission today is being considered residual, by means of some few native and peridomestic species, such as Triatoma brasiliensis and Triatoma pseudomaculata. There is, also, the risk of progressive domiciliation of some species before considered sylvatic, such as Panstrongylus lutzi and Triatoma rubrovaria. Finally, there is the possibility of the occurrence of cases

  2. VOYAGE PLANNING

    Directory of Open Access Journals (Sweden)

    Kazimierz SKÓRA

    2016-09-01

    Full Text Available A sea voyage can be divided into three parts with varying degrees of risk: - from the berth at the port of departure to the pilot disembarkation point - from the pilot disembarkation to another pilot embarkation point near the port of call/destination - from the pilot embarkation point to the berth Results of statistical research into ship accidents at sea point to an increased number of incidents and accidents, including groundings, especially in restricted areas. Such areas are often narrow and have limited depths, while their short straight sections require frequent course alterations, often in varying hydrometeorological conditions. Due to all these factors, the voyage has to be carefully planned and all watchkeeping officers have to be well prepared to conduct the ship safely. The article presents the objectives, scope, legal basis and stages in the process of voyage planning. The compliance with the outlined principles will reduce the level of risk in maritime transport.

  3. Rocket experiment METS - Microwave Energy Transmission in Space

    Science.gov (United States)

    Kaya, N.; Matsumoto, H.; Akiba, R.

    A Microwave Energy Transmission in Space (METS) rocket experiment is being planned by the Solar Power Satellite Working Group at the Institute of Space and Astronautical Science in Japan for the forthcoming International Space Year, 1992. The METS experiment is an advanced version of the previous MINIX rocket experiment (Matsumoto et al., 1990). This paper describes a conceptual design of the METS rocket experiment. It aims at verifying a newly developed microwave energy transmission system for space use and to study nonlinear effects of the microwave energy beam in the space plasma environment. A high power microwave of 936 W will be transmitted by the new phased-array antenna from a mother rocket to a separated target (daughter rocket) through the ionospheric plasma. The active phased-array system has a capability of focusing the microwave energy around any spatial point by controlling the digital phase shifters individually.

  4. Rocket experiment METS Microwave Energy Transmission in Space

    Science.gov (United States)

    Kaya, N.; Matsumoto, H.; Akiba, R.

    A METS (Microwave Energy Transmission in Space) rocket experiment is being planned by the SPS (Solar Power Satellite) Working Group at the Institute of Space and Astronautical Science (ISAS) in Japan for the forthcoming International Space Year (ISY), 1992. The METS experiment is an advanced version of our MINIX rocket experiment. This paper describes the conceptual design for the METS rocket experiment. Aims are to verify the feasibility of a newly developed microwave energy transmission system designed for use in space and to study nonlinear effects of the microwave energy beam on space plasma. A high power microwave (936 W) will be transmitted by a new phase-array antenna from a mother rocket to a separate target (daughter rocket) through the Earth's ionospheric plasma. The active phased-array system has the capability of being able to focus the microwave energy at any spatial point by individually controlling the digital phase shifters.

  5. Electric and magnetic field reduction by alternative transmission line options

    Energy Technology Data Exchange (ETDEWEB)

    Stewart, J.R. (Power Technologies, Inc., Schenectady, NY (United States)); Dale, S.J. (Oak Ridge National Lab., TN (United States)); Klein, K.W. (Energetics, Inc., Columbia, MD (United States))

    1991-01-01

    Ground level electric, and more recently magnetic, fields from overhead power transmission lines are increasingly important considerations in right of way specification, with states setting or planning to set edge of right of way limits. Research has been conducted in high phase order power transmission wherein six of twelve phases are used to transmit power in less physical space and with reduced electrical environmental effects than conventional designs. The first magnetic field testing, as reported in this paper, has verified predictive methods for determination of magnetic fields from high phase order lines. Based on these analytical methods, field profiles have been determined for lines of different phase order of comparable power capacity. Potential advantages of high phase order as a means of field mitigation are discussed. 10 refs., 12 figs., 3 tabs.

  6. Transmission analysis in WDM networks

    DEFF Research Database (Denmark)

    Rasmussen, Christian Jørgen

    1999-01-01

    This thesis describes the development of a computer-based simulator for transmission analysis in optical wavelength division multiplexing networks. A great part of the work concerns fundamental optical network simulator issues. Among these issues are identification of the versatility and user...... the different component models are invoked during the simulation of a system. A simple set of rules which makes it possible to simulate any network architectures is laid down. The modelling of the nonlinear fibre and the optical receiver is also treated. The work on the fibre concerns the numerical solution...

  7. Neutron transmission through crystalline Fe

    International Nuclear Information System (INIS)

    Adib, M.; Habib, N.; Kilany, M.; El-Mesiry, M.S.

    2004-01-01

    The neutron transmission through crystalline Fe has been calculated for neutron energies in the range 10 4 < E<10 eV using an additive formula. The formula permits calculation of the nuclear capture, thermal diffuse and Bragg scattering cross-section as a function of temperature and crystalline form. The obtained agreement between the calculated values and available experimental ones justifies the applicability of the used formula. A feasibility study on using poly-crystalline Fe as a cold neutron filter and a large Fe single crystal as a thermal one is given

  8. Force transmission in epithelial tissues.

    Science.gov (United States)

    Vasquez, Claudia G; Martin, Adam C

    2016-03-01

    In epithelial tissues, cells constantly generate and transmit forces between each other. Forces generated by the actomyosin cytoskeleton regulate tissue shape and structure and also provide signals that influence cells' decisions to divide, die, or differentiate. Forces are transmitted across epithelia because cells are mechanically linked through junctional complexes, and forces can propagate through the cell cytoplasm. Here, we review some of the molecular mechanisms responsible for force generation, with a specific focus on the actomyosin cortex and adherens junctions. We then discuss evidence for how these mechanisms promote cell shape changes and force transmission in tissues. © 2016 Wiley Periodicals, Inc.

  9. Big plans.

    Science.gov (United States)

    Fitch, Kevin F; Doyle, James F

    2005-09-01

    In Elmhurst Memorial Healthcare's capital planning method: Future replacement costs of assets are estimated by inflating their historical cost over their lives. A balanced model is created initially based on the assumption that rates of revenue growth, inflation, investment income, and interest expense are all equal. Numbers then can be adjusted to account for possible variations, such as excesses or shortages in investment or debt balances.

  10. Business plan

    OpenAIRE

    Dorożyński, Tomasz; Urbaniak, Wojciech

    2016-01-01

    Running a business on an international scale requires not only a substantial body of knowledge but also the ability to apply it in practice. That is why our textbook, with a vast collection of practical examples, discusses a wide variety of pertinent issues connected with business operations in international markets, from international market analysis, drafting business plans, concluding business transactions and the insurance of goods through to customs clearance procedures and professional ...

  11. Generation capacity expansion planning in deregulated electricity markets

    Science.gov (United States)

    Sharma, Deepak

    With increasing demand of electric power in the context of deregulated electricity markets, a good strategic planning for the growth of the power system is critical for our tomorrow. There is a need to build new resources in the form of generation plants and transmission lines while considering the effects of these new resources on power system operations, market economics and the long-term dynamics of the economy. In deregulation, the exercise of generation planning has undergone a paradigm shift. The first stage of generation planning is now undertaken by the individual investors. These investors see investments in generation capacity as an increasing business opportunity because of the increasing market prices. Therefore, the main objective of such a planning exercise, carried out by individual investors, is typically that of long-term profit maximization. This thesis presents some modeling frameworks for generation capacity expansion planning applicable to independent investor firms in the context of power industry deregulation. These modeling frameworks include various technical and financing issues within the process of power system planning. The proposed modeling frameworks consider the long-term decision making process of investor firms, the discrete nature of generation capacity addition and incorporates transmission network modeling. Studies have been carried out to examine the impact of the optimal investment plans on transmission network loadings in the long-run by integrating the generation capacity expansion planning framework within a modified IEEE 30-bus transmission system network. The work assesses the importance of arriving at an optimal IRR at which the firm's profit maximization objective attains an extremum value. The mathematical model is further improved to incorporate binary variables while considering discrete unit sizes, and subsequently to include the detailed transmission network representation. The proposed models are novel in the

  12. Strategic plan

    International Nuclear Information System (INIS)

    1993-01-01

    In November 1989, the Office of Environmental Restoration and Waste Management (EM) was formed within the US Department of Energy (DOE). The EM Program was born of the recognition that a significant national effort was necessary to clean up over 45 years' worth of environmental pollution from DOE operations, including the design and manufacture of nuclear materials and weapons. Within EM, the Deputy Assistant Secretary for Environmental Restoration (EM-40) has been assigned responsibility for the assessment and cleanup of areas and facilities that are no longer a part of active DOE operations, but may be contaminated with varying levels and quantifies of hazardous, radioactive, and n-mixed waste. Decontamination and decommissioning (D ampersand D) activities are managed as an integral part of Envirorunental Restoration cleanup efforts. The Office of Environmental Restoration ensures that risks to the environment and to human health and safety are either eliminated or reduced to prescribed, acceptable levels. This Strategic Plan has been developed to articulate the vision of the Deputy Assistant Secretary for Environmental Restoration and to crystallize the specific objectives of the Environmental Restoration Program. The document summarizes the key planning assumptions that guide or constrain the strategic planning effort, outlines the Environmental Restoration Program's specific objectives, and identifies barriers that could limit the Program's success

  13. Imaging dopamine transmission in schizophrenia

    International Nuclear Information System (INIS)

    Laruelle, M.

    1998-01-01

    Over the last ten years, several positron emission tomography (PET) and single photon computerized tomography (SPECT) studies of the dopamine (DA) system in patients with schizophrenia were performed to test the hypothesis that DA hyperactivity is associated with this illness. In this paper are reviewed the results of fifteen brain imaging studies comparing indices of DA function in drug naive or drug free patients with schizophrenia and healthy controls: thirteen studies included measurements of Da D 2 receptor density, two studies compared amphetamine-induced DA release, and two studies measured DOPA decarboxylase activity, an enzyme involved in DA synthesis. It was conducted a meta-analysis of the studies measuring D 2 receptor density parameters, under the assumption that all tracers labeled the same population of D 2 receptors. This analysis revealed that, compared to healthy controls, patients with schizophrenia present a significant but mild elevation of D 2 receptor density parameters and a significant larger variability of these indices. It was found no statistical evidence that studies performed with radiolabeled butyrophenones detected a larger increase in D 2 receptor density parameters than studies performed with other radioligands, such as benzamides. Studies of presynaptic activity revealed an increase in DA transmission response to amphetamine challenge, and an increase in DOPA decarboxylase activity. Together, these data are compatible with both pre- and post-synaptic alterations of DA transmission in schizophrenia. Future studies should aim at a better characterization of these alterations, and at defining their role in the pathophysiology of the illness

  14. Wildlife and electric power transmission

    Science.gov (United States)

    Ellis, D.H.; Goodwin, J.G.; Hunt, J.R.; Fletcher, John L.; Busnel, R.G.

    1978-01-01

    Hundreds of thousands of miles of transmission lines have been introduced into our natural environment. These lines and their corridors can be damaging or beneficial to wildlife communities depending on how they are designed, where they are placed, and when they are constructed and maintained. With the current trend toward UHV systems, new problems (associated with additional increments in audible noise, electric and magnetic force fields, etc.) must be addressed. We recommend the following areas for careful study: (1) the response of wilderness species to transmission lines and line construction and maintenance activities (2) the magnitude of bird collision and electrocution mortality, (3) the response of power corridor and power tower in habiting wildlife to laboratory and field doses of electro-chemical oxidants, corona noise, electric and magnetic fields, etc., (4) the productivity of tower inhabiting birds compared with nearby non-tower nesters, and (5) the influence of powerline corridors on mammalian and avian migration patterns. It is our hope that the questions identified in this study will help stimulate further research so that we can maximize wildlife benefits and minimize wildlife detriments.

  15. neutron transmission through crystalline materials

    International Nuclear Information System (INIS)

    El Mesiry, M.S.

    2011-01-01

    The aim of the present work is to study the neutron transmission through crystalline materials. Therefore a study of pyrolytic graphite (PG) as a highly efficient selective thermal neutron filter and Iron single crystal as a whole one, as well as the applicability of using their polycrystalline powders as a selective cold neutron filters is given. Moreover, the use of PG and iron single crystal as an efficient neutron monochromator is also investigated. An additive formula is given which allows calculating the contribution of the total neutron cross-section including the Bragg scattering from different )(hkl planes to the neutron transmission through crystalline iron and graphite. The formula takes into account their crystalline form. A computer CFe program was developed in order to provide the required calculations for both poly- and single-crystalline iron. The validity of the CFe program was approved from the comparison of the calculated iron cross-section data with the available experimental ones. The CFe program was also adapted to calculate the reflectivity from iron single crystal when it used as a neutron monochromator The computer package GRAPHITE, developed in Neutron Physics laboratory, Nuclear Research Center, has been used in order to provide the required calculations for crystalline graphite in the neutron energy range from 0.1 meV to 10 eV. A Mono-PG code was added to the computer package GRAPHITE in order to calculate the reflectivity from PG crystal when it used as a neutron monochromator.

  16. [Human transmissible subacute spongiform encephalopathy].

    Science.gov (United States)

    Dormont, D

    1994-05-01

    Human transmissible spongiform encephalopathies (TSE) are rare chronic subacute degenerative diseases of the central nervous system (CNS) which include Creutzfeldt-Jakob disease (CJD), Kuru, Gerstmann-Sträussler-Scheinker syndrome (GSS), and Fatal Familial Insomnia (FFI). CJD can be either inherited or sporadic. All these diseases are always fatal. Neuropathological features are mainly constituted of neuronal vacuolisation, neuronal death, gliosis with hyperastrocytosis; plaques might be evidenced in kuru and GSS. Neither inflammatory syndrome nor demyelination is detectable. No virus like structure could be identified reproducibly. Human TSE are transmissible to non human primates and rodents. Iatrogenic CJD have been described after tissue grafting (cornea, dura mater), neurosurgery, electrophysiology investigation, and treatment with pituitary derived gonadotrophins and growth hormone. Molecular biochemistry of the CNS investigation revealed that a host encoded protein, the prion protein (PrP), accumulates proportionally to the infectious titer: this abnormality is the only detectable hallmark in TSE. Infectious fractions contain no detectable specific nucleic acid, and are mainly constituted of PrP under an isoform which resists to proteinase K digestion (PrP-res). The PrP gene (PRNP) is located on chromosome 20 in humans. Several mutations of this gene have been described in all inherited TSE (CJD, GSS, and IFF). No treatment is available today. Agents inducing TSE (TSA) are not known: several authors claim that TSA are only constituted of PrP-res; others support the hypothesis of a conventional agent with a specific genetic information.

  17. Money and transmission of bacteria.

    Science.gov (United States)

    Gedik, Habip; Voss, Timothy A; Voss, Andreas

    2013-08-28

    Money is one of the most frequently passed items in the world. The aim of this study was to ascertain the survival status of bacteria including Staphylococcus aureus, Escherichia coli, and Vancomycin- Resistant Enterococci (VRE) on banknotes from different countries and the transmission of bacteria to people who come in contact with the banknotes. The survival rate was highest for the Romanian Leu yielding all three microorganisms used after both three and six hours of drying. Furthermore, the Leu was the only banknote to yield VRE after one day of drying. Other currencies either enabled the survival of Extended-Spectrum Beta-Lactamases (ESBL) and VRE (e.g. Euro), but not of MRSA, or the other way round (e.g. US Dollar). While a variety of factors such as community hygiene levels, people's behaviour, and antimicrobial resistance rates at community level obviously have influence on the transmission of resistant microorganisms, the type of banknote-paper may be an additional variable to consider.

  18. TRANSMISSIBLE VENEREAL TUMOR - LITERATURE REVIEW

    Directory of Open Access Journals (Sweden)

    T. R. B Berndt

    2016-11-01

    Full Text Available Transmissible venereal tumor (TVT is a contagious disease among the family of canines. Has a high prevalence in temperate regions and mainly affects male and female dogs wandering. Transmissible venereal tumor's main characteristic is a sexually transmitted cancer, through intercourse, and also transmitted through cell transplantation, an animal that has the disease to another Sound, which has an abrasion or epithelial discontinuity through licking or contact direct to neoplasia. It has no known etiology, although some authors suggest that there may be some virus as an agent. Is macroscopically observed as a crumbly mass, ulcerated, hemorrhagic, with the appearance of cauliflower. Their cells, if observed microscopically, have very clear, round and giant nucleus stained cytoplasm, and the presence of vacuolated cells in mitosis. The diagnosis can be accomplished by fine needle aspiration cytology, "imprint", histopathology, imaging tests such as x-ray and ultrasound, which are used for observation of metastases in internal organs. The main treatment is chemotherapy with substances such as vincristine dose of 0.5 to 0.7 mg / m², intra venous (IV, or from 0.0125 to 0.025 mg / kg IV once a week, four to eight weeks, and for animals which have acquired resistance to vincristine sulfate, is associated with the chemotherapeutic doxorubicin at a dose of 30 mg / m² IV once a week for four to eight weeks. Some protocols include prednisolone associated with vincristine sulfate for the treatment of Extragenital TVT.

  19. The limits of HVDC transmission

    International Nuclear Information System (INIS)

    Pickard, William F.

    2013-01-01

    Renewable energy is abundant, but not necessarily near the urban centers where it will be used. Therefore, it must be transported; and this transport entails a systemic energy penalty. In this paper simple qualitative calculations are introduced to show (i) that high-voltage direct-current (HVDC) power lines for megameter and greater distances are unlikely to achieve power capacities much beyond 2 GW, although they can be paralleled; (ii) that most sources and sinks of electric power are rather less than 10,000 km apart; (iii) that such long lines can be constructed to have transmission losses -tilde 2%; and (iv) that lines of such low loss in fact meet minimal standards of intergenerational equity. - Highlights: • Renewable Energy is abundant, but not necessarily near population centers. • Its transportation requires energy and can be a major systemic inefficiency. • HVDC can be transmitted 10,000 km with 2% loss and near-optimal embodied energy. • Such transmission meets the requirements of intergenerational equity

  20. Information transmission on hybrid networks

    Science.gov (United States)

    Chen, Rongbin; Cui, Wei; Pu, Cunlai; Li, Jie; Ji, Bo; Gakis, Konstantinos; Pardalos, Panos M.

    2018-01-01

    Many real-world communication networks often have hybrid nature with both fixed nodes and moving modes, such as the mobile phone networks mainly composed of fixed base stations and mobile phones. In this paper, we discuss the information transmission process on the hybrid networks with both fixed and mobile nodes. The fixed nodes (base stations) are connected as a spatial lattice on the plane forming the information-carrying backbone, while the mobile nodes (users), which are the sources and destinations of information packets, connect to their current nearest fixed nodes respectively to deliver and receive information packets. We observe the phase transition of traffic load in the hybrid network when the packet generation rate goes from below and then above a critical value, which measures the network capacity of packets delivery. We obtain the optimal speed of moving nodes leading to the maximum network capacity. We further improve the network capacity by rewiring the fixed nodes and by considering the current load of fixed nodes during packets transmission. Our purpose is to optimize the network capacity of hybrid networks from the perspective of network science, and provide some insights for the construction of future communication infrastructures.

  1. APEnet+ 34 Gbps data transmission system and custom transmission logic

    International Nuclear Information System (INIS)

    Ammendola, R; Biagioni, A; Frezza, O; Lonardo, A; Cicero, F Lo; Paolucci, P S; Rossetti, D; Simula, F; Tosoratto, L; Vicini, P

    2013-01-01

    APEnet+ is a point-to-point, low-latency, 3D-torus network controller integrated in a PCIe Gen2 board based on the Altera Stratix IV FPGA. We characterize the transmission system (embedded transceivers driving external QSFP+ modules) analyzing signal integrity, throughput, latency, BER and jitter at different data rates up to 34 Gbps. We estimate the efficiency of a custom logic able to sustain 2.6 GB/s per link with an FPGA on-chip memory footprint of 40 KB, providing deadlock-free routing and systemic awareness of faults. Finally, we show the preliminary results obtained with the embedded transceivers of a next-generation FPGA and outline some ideas to increase the performance with the same FPGA memory footprint

  2. APEnet+ 34 Gbps data transmission system and custom transmission logic

    Energy Technology Data Exchange (ETDEWEB)

    Ammendola, R [INFN Sezione di Roma Tor Vergata, Via della Ricerca Scientifica, 1 - 00133 Roma Italy (Italy); Biagioni, A; Frezza, O; Lonardo, A; Cicero, F Lo; Paolucci, P S; Rossetti, D; Simula, F; Tosoratto, L; Vicini, P [INFN Sezione di Roma, P.le Aldo Moro, 2 - 00185 Roma Italy (Italy)

    2013-12-01

    APEnet+ is a point-to-point, low-latency, 3D-torus network controller integrated in a PCIe Gen2 board based on the Altera Stratix IV FPGA. We characterize the transmission system (embedded transceivers driving external QSFP+ modules) analyzing signal integrity, throughput, latency, BER and jitter at different data rates up to 34 Gbps. We estimate the efficiency of a custom logic able to sustain 2.6 GB/s per link with an FPGA on-chip memory footprint of 40 KB, providing deadlock-free routing and systemic awareness of faults. Finally, we show the preliminary results obtained with the embedded transceivers of a next-generation FPGA and outline some ideas to increase the performance with the same FPGA memory footprint.

  3. Effectiveness of reactive case detection for malaria elimination in three archetypical transmission settings: a modelling study.

    Science.gov (United States)

    Gerardin, Jaline; Bever, Caitlin A; Bridenbecker, Daniel; Hamainza, Busiku; Silumbe, Kafula; Miller, John M; Eisele, Thomas P; Eckhoff, Philip A; Wenger, Edward A

    2017-06-12

    reactive case detection or mass drug campaigns. Reactive case detection is recommended only for settings where transmission has recently been reduced rather than all low-transmission settings. This is demonstrated in a modelling framework with strong out-of-sample accuracy across a range of transmission settings while including methodologies for understanding the most resource-effective allocations of health workers. This approach generalizes to providing a platform for planning rational scale-up of health systems based on locally-optimized impact according to simplified stratification.

  4. Navajo transmission project. Final Environmental Impact Statement (FEIS)

    International Nuclear Information System (INIS)

    1997-08-01

    Dine Power Authority, a Navajo Nation enterprise, proposes to construct a 500 kilovolt transmission line planned to deliver electrical power from the Shiprock Substation in northwestern New Mexico to the Marketplace Substation in southern Nevada. The line would relieve constraints on transmission of electricity west from the Four Corners area; improve operational flexibility and reliability of the overall system; and allow increased economical transfers, sales, and purchases in the Rocky Mountains/Four Corners/Desert Southwest region. Also, the project allows an opportunity for the Navajo Nation to participate in the electrical utility industry and promote economic development to benefit the people of the Navajo Nation. Six alternatives were considered and include (1) energy conservation and electric load management, (2) new generation facilities, (3) use of existing transmission systems, (4) alternative transmission technologies, (5) no action, and (6) the proposed action. For the proposed action, the following alternative routes and ancillary facility locations are addressed in the EIS: four alternative routes and five substations in the eastern portion of the project area; and six alternative routes, three substation sites, and a microwave communication facility in the western portion of the project area. The existing condition of the environmental resources in the project area is described, and potential impacts on those resources as a result of the proposed action are addressed. The impacts of the proposed action would be caused mainly by access roads, tower sites, and other associated facilities on soils, vegetation, wildlife, and cultural and paleontological resources; and the impact of the transmission line's presence on visual resources and land uses. Public comments on the draft EIS are addressed in this FEIS

  5. A sub-microscopic gametocyte reservoir can sustain malaria transmission.

    Directory of Open Access Journals (Sweden)

    Stephan Karl

    Full Text Available Novel diagnostic tools, including PCR and high field gradient magnetic fractionation (HFGMF, have improved detection of asexual Plasmodium falciparum parasites and especially infectious gametocytes in human blood. These techniques indicate a significant number of people carry gametocyte densities that fall below the conventional threshold of detection achieved by standard light microscopy (LM.To determine how low-level gametocytemia may affect transmission in present large-scale efforts for P. falciparum control in endemic areas, we developed a refinement of the classical Ross-Macdonald model of malaria transmission by introducing multiple infective compartments to model the potential impact of highly prevalent, low gametocytaemic reservoirs in the population. Models were calibrated using field-based data and several numerical experiments were conducted to assess the effect of high and low gametocytemia on P. falciparum transmission and control. Special consideration was given to the impact of long-lasting insecticide-treated bed nets (LLIN, presently considered the most efficient way to prevent transmission, and particularly LLIN coverage similar to goals targeted by the Roll Back Malaria and Global Fund malaria control campaigns. Our analyses indicate that models which include only moderate-to-high gametocytemia (detectable by LM predict finite eradication times after LLIN introduction. Models that include a low gametocytemia reservoir (requiring PCR or HFGMF detection predict much more stable, persistent transmission. Our modeled outcomes result in significantly different estimates for the level and duration of control needed to achieve malaria elimination if submicroscopic gametocytes are included.It will be very important to complement current methods of surveillance with enhanced diagnostic techniques to detect asexual parasites and gametocytes to more accurately plan, monitor and guide malaria control programs aimed at eliminating malaria.

  6. Planning Inequality

    DEFF Research Database (Denmark)

    Mandersheid, Katharina; Richardson, Tim

    2011-01-01

    as a territorial container, in which the social merges into regional and national entities. Correspondingly, movement is only interpreted as a derived demand, ignoring its integrative aspect as precondition of participation and part of network capital. On the other hand, the spatiality of the economy...... is represented as something outside and fluid which is meant to be channelled into the territorial containers by means of regional development and spatial planning. These representations of the social suggest a territorialized culturally integrated society as the unquestioned frame of reference which has lost...

  7. Magnetically insulated transmission line oscillator

    Science.gov (United States)

    Bacon, L.D.; Ballard, W.P.; Clark, M.C.; Marder, B.M.

    1987-05-19

    A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields are produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap. 11 figs.

  8. Multimedia signal coding and transmission

    CERN Document Server

    Ohm, Jens-Rainer

    2015-01-01

    This textbook covers the theoretical background of one- and multidimensional signal processing, statistical analysis and modelling, coding and information theory with regard to the principles and design of image, video and audio compression systems. The theoretical concepts are augmented by practical examples of algorithms for multimedia signal coding technology, and related transmission aspects. On this basis, principles behind multimedia coding standards, including most recent developments like High Efficiency Video Coding, can be well understood. Furthermore, potential advances in future development are pointed out. Numerous figures and examples help to illustrate the concepts covered. The book was developed on the basis of a graduate-level university course, and most chapters are supplemented by exercises. The book is also a self-contained introduction both for researchers and developers of multimedia compression systems in industry.

  9. Electricity transmission pricing and technology

    International Nuclear Information System (INIS)

    Einhorn, M.; Siddiqi, R.

    1996-01-01

    The electric utility industry and its stake holders in the United States appear to be at a critical juncture in time. Powerful forces of global proportions are propelling the industry instinctively and in a secular fashion towards restructuring. That the industry will change is a fait accomplii. The nature and timing of the change is still a matter of intense debate, however. Because of the evolution of the industry into its present-day form, i.e. regulated local monopolies in their designated franchise service territories, the relative roles and expectations of various institutions would have to change to conform to the new state in the future. In either encouraging, or allowing this change to happen, society is essentially saying that future societal welfare would be better served by the changed structure contemplated. What that assumption translates into in more direct terms is that creation of future wealth would be better accomplished through redistribution of wealth today. Thoughtful individuals recognize the enormous responsibility placed upon the various entities empowered with jurisdiction over the timing and nature of the structural change. They are trying hard to bring analytical rigor to bear on the debate. One very critical element of this debate on restructuring is the issue of the treatment of transmission. The issue has been variously labeled transmission access, or pricing. Volumes have been written and spoken on this topic. We felt that there was a pressing need to assemble a volume which would serve as a one-stop source for varied viewpoints and comprehensive coverage of the subject, both technical and economic. 58 figs., 23 tabs., 103 refs

  10. Design and development of a continuously variable ratio transmission for an automotive vehicle. Phase IV. Quarterly progress report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-05-31

    Progress in the design and development of a continuously variable ratio transmission for an automotive vehicle is reported. The Major automotive hydromechanical transmission development problem continues to be the reduction of hydrostatic noise and the project plan, therefore, concentrated on the new hydrostatic module. The potential for achieving acceptably low noise levels in the second generation hydromechanical transmission is to be assessed by comparing the noise levels of the hydrostatic modules for the first and second generation transmissions. A set of twelve test points was selected comprising of road load steady state and wide-open-throttle acceleration at 10, 20, 30, 40, 50 and 60 mph. The module operating conditions for the two transmissions at each of these twelve points were calculated. Baseline noise data was measured on the first generation module. The results are given testing of co-axial hydrostatic module for second generation hydromechanical transmission will be emphasized. (LCL)

  11. Multiemployer Pension Plans

    Data.gov (United States)

    Pension Benefit Guaranty Corporation — This spreadsheet lists the active multiemployer pensions plans insured by PBGC. Plans are identified by name, employer identification number (EIN) and plan number...

  12. Transmission access and retail wheeling. The key questions

    International Nuclear Information System (INIS)

    Casazza, J.A.

    1996-01-01

    The key questions involving transmission access and retail wheeling are discussed, distinguishing between opposing views regarding the effect on system costs and the environment, particularly on optimal planning involving matching capacity and demand, generation use, demand side management, and economic operations. Also discussed are contrasting views regarding the effect of cost control pressures, regulatory advantages and disadvantages, the impact on system reliability, and the stranding of investment. The author's key concern is the effect of retail wheeling upon optimal planning and operation i.e., will competitors be willing to provide one another with the cost and technical information required for coordination? In his worst scenario, retail wheeling may lead to substantial production cost increases, lessened reliability, and unfair cost-shifting between customer classes. More optimistically, production costs and reliability may be unaffected and the cost-shifting could be salubrious. 7 figs., 11 refs

  13. Why transmission is still the critical link

    Energy Technology Data Exchange (ETDEWEB)

    Flynn, V. [ESBI Alberta Ltd., Calgary, AB (Canada)

    2002-07-01

    This paper describes the important role that transmission plays in the competitive electric power industry in North America and around the world. In the past several years the transmission sector has experienced a lack of investment, congestion on transmission networks, merchant transmission development, and the creation of Regional Transmission Organizations (RTOs). The transmission grid is central to the reliability of the entire electricity system. It also plays a vital role in promoting efficient markets in electricity. The author discusses the consequences of inadequate investment to this critical link within the power industry. He also discusses how much investment is needed, and the challenges and solutions to building an infrastructure. The integrated electric system and the electricity industry in Alberta is very different from those in the United Sates, but the issues facing the industry are the same. The challenge is the sharp increase in the number of system access requests by new generators combined with the difficulties in siting new transmission lines. There are 17,000 km of transmission lines in Alberta, at voltages ranging from 69 kV to 500 kV. There are also connections between neighbouring provinces. The transmission lines have a value of C$1.5 billion. Since there have been no major additions to the transmission grid since the mid-1980s, significant investments in the coming years will have a disproportionate impact on the cost of transmission. Two merchant transmission projects have been proposed. The first will enhance transfer of electricity between Alberta and Saskatchewan by 150 MW, and the second is proposed to be a 1,500 MW, 500 kV DC line from the Fort McMurray area to the Pacific Northwest. 5 figs.

  14. Transmission and capacity pricing and constraints

    International Nuclear Information System (INIS)

    Fusco, M.

    1999-01-01

    A series of overhead viewgraphs accompanied this presentation which discussed the following issues regarding the North American electric power industry: (1) capacity pricing transmission constraints, (2) nature of transmission constraints, (3) consequences of transmission constraints, and (4) prices as market evidence. Some solutions suggested for pricing constraints included the development of contingent contracts, back-up power in supply regions, and new line capacity construction. 8 tabs., 20 figs

  15. Transmissible Spongiform Encephalopathy and Meat Safety

    Science.gov (United States)

    Ward, Hester J. T.; Knight, Richard S. G.

    Prion diseases or transmissible spongiform encephalopathies (TSEs) comprise a wide-ranging group of neurodegenerative diseases found in animals and humans. They have diverse causes and geographical distributions, but have similar pathological features, transmissibility and, are ultimately, fatal. Central to all TSEs is the presence of an abnormal form of a normal host protein, namely the prion protein. Because of their potential transmissibility, these diseases have wide public health ramifications.

  16. Response analysis on nonuniform transmission line

    Directory of Open Access Journals (Sweden)

    Cvetković Zlata

    2005-01-01

    Full Text Available Transients on a loss less exponential transmission line with a pure resistance load are presented in this paper. The approach is based on the two-port presentation of the transmission line. Using Picard-Carson's method the transmission line equations are solved. The relationship between source voltage and the load voltage in s-domain is derived. All the results are plotted using program package Mathematica 3.0.

  17. Puget Sound area electric reliability plan: Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1992-04-01

    The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin

  18. Grassroots Technological Resistance: The People's Power Project and the Impossible Dream of Wireless Transmission of Energy.

    Science.gov (United States)

    Schmidt, Pete

    2017-09-01

    In 1972, the Minnesota United Power Association (UPA) teamed up with the Minnesota Cooperative Power Association (CPA) to initiate an electrification project designed to bring power from North Dakota to the Twin Cities area. A significant backlash and protest began once farmers across the state became aware of the plan and the potential impending land seizure. In the midst of these actions, one group sought to create an alternative to the power line transmission system by designing a system of wireless energy transmission based on the plans of Nikola Tesla. This self-funded conglomeration of farmers and amateur researchers formed the People's Power Project (PPP) and set about building Tesla's system for the wireless transmission of energy. Using archival documents, this paper recounts this episode and argues that, in this case, the potential for successful grassroots action was derailed by the influence of longstanding myths about Tesla and his devices. Copyright © 2017 Elsevier Ltd. All rights reserved.

  19. Transmission electron microscopy investigation of colloids and particles from landfill leachates

    Czech Academy of Sciences Publication Activity Database

    Matura, M.; Ettler, V.; Klementová, Mariana

    2012-01-01

    Roč. 30, č. 5 (2012), s. 530-541 ISSN 0734-242X Institutional research plan: CEZ:AV0Z40320502 Keywords : colloids * landfill leachates * transmission electron microscopy * calcite * contaminant mobility Subject RIV: CA - Inorganic Chemistry Impact factor: 1.047, year: 2012

  20. 76 FR 66922 - Dominion Transmission, Incorporated; Notice of Intent To Prepare an Environmental Assessment for...

    Science.gov (United States)

    2011-10-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Docket No. PF11-9-000] Dominion Transmission, Incorporated; Notice of Intent To Prepare an Environmental Assessment for the Planned Allegheny Storage Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting The staff of the Federal Energy Regulatory...

  1. 78 FR 57626 - Algonquin Gas Transmission, LLC; Notice of Intent To Prepare An Environmental Impact Statement...

    Science.gov (United States)

    2013-09-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF13-16-000] Algonquin Gas Transmission, LLC; Notice of Intent To Prepare An Environmental Impact Statement for the Planned Algonquin Incremental Market Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings The staff of the Federal Energy...

  2. Transmission problem for the Laplace equation and the integral equation method

    Czech Academy of Sciences Publication Activity Database

    Medková, Dagmar

    2012-01-01

    Roč. 387, č. 2 (2012), s. 837-843 ISSN 0022-247X Institutional research plan: CEZ:AV0Z10190503 Keywords : transmission problem * Laplace equation * boundary integral equation Subject RIV: BA - General Mathematics Impact factor: 1.050, year: 2012 http://www.sciencedirect.com/science/article/pii/S0022247X11008985

  3. Volume transmission in health and disease: communication via the brain extracellular space

    Czech Academy of Sciences Publication Activity Database

    Syková, Eva

    2003-01-01

    Roč. 85, č. 2 (2003), s. 2 ISSN 0022-3042. [Meeting of the European Society for Neurochemistry /14./. Varšava, 01.06.2003-04.06.2003] Institutional research plan: CEZ:AV0Z5039906 Keywords : volume transmission * extracellular space Subject RIV: FH - Neurology Impact factor: 4.825, year: 2003

  4. Data transmission from seismic stations via network AGNES using GSM-GPRS technology

    Czech Academy of Sciences Publication Activity Database

    Knejzlík, Jaromír

    2004-01-01

    Roč. 1, č. 1 (2004), s. 73-76 ISSN 1211-1910. [Mining and Environmental geophysics/29./. Sedmihorky, 00.06.2003] R&D Projects: GA ČR GA205/01/0480 Institutional research plan: CEZ:AV0Z3086906 Keywords : seismic data transmission * GMS * GPRS Subject RIV: DC - Siesmology, Volcanology, Earth Structure

  5. Hop latent viroid (HLVd) microevolution: an experimental transmission of HLVd "thermomutants" to solanaceous species

    Czech Academy of Sciences Publication Activity Database

    Matoušek, Jaroslav

    2003-01-01

    Roč. 46, - (2003), s. 607-610 ISSN 0006-3134 R&D Projects: GA MZe QC1183; GA AV ČR IBS5051014 Institutional research plan: CEZ:AV0Z5051902 Keywords : HLVd * experimental transmission * solanaceous plants Subject RIV: EE - Microbiology, Virology Impact factor: 0.919, year: 2003

  6. Power transmission pricing: issues and international experience

    International Nuclear Information System (INIS)

    Bodenhoefer, H.J.; Wohlgemuth, N.

    2001-01-01

    A key aspect of electricity industry reorganization is transmission pricing because it heavily influences the degree of effective competition in 'liberalized' electricity markets. this paper presents an overview transmission pricing models, of issues related to an effective design of a transmission pricing approach, and presents approaches implemented internationally. A conclusion is that, due to the great number of institutional designs of electricity market organizations, particularly in Europe, it will be difficult to design/implement a model of cross-border transmission pricing that is capable of inducing a high degree of non-discriminatory international competition in electricity markets. (author)

  7. Transmission Line Security Monitor: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    John Svoboda

    2011-04-01

    The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

  8. VT Digital Line Graph Miscellaneous Transmission Lines

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) This datalayer is comprised of Miscellaineous Transmission Lines. Digital line graph (DLG) data are digital representations of cartographic...

  9. Electricity market equilibrium model with resource constraint and transmission congestion

    Energy Technology Data Exchange (ETDEWEB)

    Gao, F. [ABB, Inc., Santa Clara, CA 95050 (United States); Sheble, G.B. [Portland State University, Portland, OR 97207 (United States)

    2010-01-15

    Electricity market equilibrium model not only helps Independent System Operator/Regulator analyze market performance and market power, but also provides Market Participants the ability to build optimal bidding strategies based on Microeconomics analysis. Supply Function Equilibrium (SFE) is attractive compared to traditional models and many efforts have been made on it before. However, most past research focused on a single-period, single-market model and did not address the fact that GENCOs hold a portfolio of assets in both electricity and fuel markets. This paper first identifies a proper SFE model, which can be applied to a multiple-period situation. Then the paper develops the equilibrium condition using discrete time optimal control considering fuel resource constraints. Finally, the paper discusses the issues of multiple equilibria caused by transmission network and shows that a transmission constrained equilibrium may exist, however the shadow price may not be zero. Additionally, an advantage from the proposed model for merchant transmission planning is discussed. (author)

  10. Electricity market equilibrium model with resource constraint and transmission congestion

    International Nuclear Information System (INIS)

    Gao, F.; Sheble, G.B.

    2010-01-01

    Electricity market equilibrium model not only helps Independent System Operator/Regulator analyze market performance and market power, but also provides Market Participants the ability to build optimal bidding strategies based on Microeconomics analysis. Supply Function Equilibrium (SFE) is attractive compared to traditional models and many efforts have been made on it before. However, most past research focused on a single-period, single-market model and did not address the fact that GENCOs hold a portfolio of assets in both electricity and fuel markets. This paper first identifies a proper SFE model, which can be applied to a multiple-period situation. Then the paper develops the equilibrium condition using discrete time optimal control considering fuel resource constraints. Finally, the paper discusses the issues of multiple equilibria caused by transmission network and shows that a transmission constrained equilibrium may exist, however the shadow price may not be zero. Additionally, an advantage from the proposed model for merchant transmission planning is discussed. (author)

  11. A simple approach to measure transmissibility and forecast incidence.

    Science.gov (United States)

    Nouvellet, Pierre; Cori, Anne; Garske, Tini; Blake, Isobel M; Dorigatti, Ilaria; Hinsley, Wes; Jombart, Thibaut; Mills, Harriet L; Nedjati-Gilani, Gemma; Van Kerkhove, Maria D; Fraser, Christophe; Donnelly, Christl A; Ferguson, Neil M; Riley, Steven

    2018-03-01

    Outbreaks of novel pathogens such as SARS, pandemic influenza and Ebola require substantial investments in reactive interventions, with consequent implementation plans sometimes revised on a weekly basis. Therefore, short-term forecasts of incidence are often of high priority. In light of the recent Ebola epidemic in West Africa, a forecasting exercise was convened by a network of infectious disease modellers. The challenge was to forecast unseen "future" simulated data for four different scenarios at five different time points. In a similar method to that used during the recent Ebola epidemic, we estimated current levels of transmissibility, over variable time-windows chosen in an ad hoc way. Current estimated transmissibility was then used to forecast near-future incidence. We performed well within the challenge and often produced accurate forecasts. A retrospective analysis showed that our subjective method for deciding on the window of time with which to estimate transmissibility often resulted in the optimal choice. However, when near-future trends deviated substantially from exponential patterns, the accuracy of our forecasts was reduced. This exercise highlights the urgent need for infectious disease modellers to develop more robust descriptions of processes - other than the widespread depletion of susceptible individuals - that produce non-exponential patterns of incidence. Copyright © 2017 The Authors. Published by Elsevier B.V. All rights reserved.

  12. A Study on the Application for Enhancing the Transmission Capability of the KEPCO Power System

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Han; Kwon, Tea Won; Whang, Jong Young; Lee, Gun Joon; Kim, Tae Hoon; Chang, Byung Hoon; Min, Wan Ki [Korea Electric Power Research Institute, Taejon (Korea, Republic of); Park, Young Moon; Park, Jong Gun [Seoul National University, Seoul (Korea, Republic of); Kim, Gun Joong [Chungnam National University, Taejon (Korea, Republic of); Oh, Tae Kwu; Choi, Kwu Hyung [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1996-12-31

    Investigation of stability for power system in 2000 year and 2006 year by using the analysis of real power system. Comparative investigation of the conventional transmission line upgrading methods such as HVDC, HOP, new conductor scheme. Investigation of FACTS, the recent transmission line upgrading method, with respect to the aspect of technique and cost and effect analysis when this method is applied to real power system. Development of the evaluation method of transmission type that should be considered when above method is applied to real power system with respect to aspect of technique and cost. Development of a long-range plan for the transmission capacity upgrading and the evaluation method of reliability. (author).

  13. Plan Repair as an Extension of Planning

    NARCIS (Netherlands)

    Van der Krogt, R.P.J.; De Weerdt, M.M.

    2005-01-01

    In dynamic environments, agents have to deal with changing situations. In these cases, repairing a plan is often more efficient than planning from scratch, but existing planning techniques are more advanced than existing plan repair techniques. Therefore, we propose a straightforward method to

  14. Project Scheduling Based on Risk of Gas Transmission Pipe

    Science.gov (United States)

    Silvianita; Nurbaity, A.; Mulyadi, Y.; Suntoyo; Chamelia, D. M.

    2018-03-01

    The planning of a project has a time limit on which must be completed before or right at a predetermined time. Thus, in a project planning, it is necessary to have scheduling management that is useful for completing a project to achieve maximum results by considering the constraints that will exists. Scheduling management is undertaken to deal with uncertainties and negative impacts of time and cost in project completion. This paper explains about scheduling management in gas transmission pipeline project Gresik-Semarang to find out which scheduling plan is most effectively used in accordance with its risk value. Scheduling management in this paper is assissted by Microsoft Project software to find the critical path of existing project scheduling planning data. Critical path is the longest scheduling path with the fastest completion time. The result is found a critical path on project scheduling with completion time is 152 days. Furthermore, the calculation of risk is done by using House of Risk (HOR) method and it is found that the critical path has a share of 40.98 percent of all causes of the occurence of risk events that will be experienced.

  15. 3D Mesh Compression and Transmission for Mobile Robotic Applications

    Directory of Open Access Journals (Sweden)

    Bailin Yang

    2016-01-01

    Full Text Available Mobile robots are useful for environment exploration and rescue operations. In such applications, it is crucial to accurately analyse and represent an environment, providing appropriate inputs for motion planning in order to support robot navigation and operations. 2D mapping methods are simple but cannot handle multilevel or multistory environments. To address this problem, 3D mapping methods generate structural 3D representations of the robot operating environment and its objects by 3D mesh reconstruction. However, they face the challenge of efficiently transmitting those 3D representations to system modules for 3D mapping, motion planning, and robot operation visualization. This paper proposes a quality-driven mesh compression and transmission method to address this. Our method is efficient, as it compresses a mesh by quantizing its transformed vertices without the need to spend time constructing an a-priori structure over the mesh. A visual distortion function is developed to govern the level of quantization, allowing mesh transmission to be controlled under different network conditions or time constraints. Our experiments demonstrate how the visual quality of a mesh can be manipulated by the visual distortion function.

  16. Structural vulnerability in transmission systems: Cases of Colombia and Spain

    International Nuclear Information System (INIS)

    Correa, Gabriel J.; Yusta, José M.

    2014-01-01

    Highlights: • Vulnerability analysis of transmission electric systems in Colombia and Spain. • Based on scale-free graph statistic indexes. • Evaluating both current conditions and expansion plans of infrastructures. • Comparison of random error and deliberate attack tolerance evaluation. - Abstract: In this paper the authors apply methodological strategies for the structural vulnerability assessment in high voltage power networks based upon the combination of power flow models and scale-free graph statistic indexes. Thus, it is possible to study risk scenarios based on events that may trigger cascading failures within a power system. The usefulness of graph theory techniques has been validated on previous works of the authors, and may be applied in analysis of the vulnerability of different power electric networks. A case study for vulnerability analysis is carried out through methodologies that allow comparison on random error and deliberate attack tolerance evaluation in transmission electric systems from countries like Colombia and Spain. Such vulnerability assessment methodology takes into account the current conditions of the power networks (base case), as well as the impact of expansion plans into infrastructures as defined by their governments. Consequently, the authors show the advantage on the use of graph theory based techniques for vulnerability analysis of electrical power systems

  17. Planning documents: a business planning strategy.

    Science.gov (United States)

    Kaehrle, P A

    2000-06-01

    Strategic planning and business plan development are essential nursing management skills in today's competitive, fast paced, continually changing health care environment. Even in times of great uncertainty, nurse managers need to plan and forecast for the future. A well-written business plan allows nurse managers to communicate their expertise and proactively contribute to the programmatic decisions and changes occurring within their patient population or service area. This article presents the use of planning documents as a practical, strategic business planning strategy. Although the model addresses orthopedic services specifically, nurse managers can gain an understanding and working knowledge of planning concepts that can be applied to all patient populations.

  18. Regional Transmission Organizations and Wind Energy: A Happy Marriage or Divorce Proceedings?; Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Parsons, B.; Porter, K.

    2002-05-01

    In 1996, the Federal Energy Regulatory Commission (FERC) issued Order 888, which required transmission-owning utilities under FERC jurisdiction to provide open access transmission service to eligible wholesale power customers. Among other things, the elements of electric service are unbundled, meaning that wind project developers must not only find a taker for the energy but also potentially make interconnection, ancillary service, and transmission arrangements for their wind projects. In 1999, the FERC issued Order 2000, which required transmission-owning utilities to file an intent with FERC on whether they have joined or plan to join a regional transmission organization (RTO). Order 2000 also required RTOs to meet certain criteria and be approved by FERC in order to begin operations as an RTO. More recently, FERC said it would issue a Notice of Proposed Rulemaking in 2002 on certain requirements and services, often termed''standard market design'' (SMD), that must be included in all transmission tariffs filed at FERC. This paper discusses the chronology of open access transmission issues, from Order 888 onward, and reviews some of the important issues raised by FERC's SMD initiative.

  19. Northern States Power Company's open transmission tariff from a customer's perspective

    International Nuclear Information System (INIS)

    Marietta, K.E.; Achinger, S.K.

    1993-01-01

    In October of 1990, Northern States Power Company (NSP or Company), filed a unique open transmission tariff for both captive customers and through-system transactions. This is an important step towards expanding transmission services in the United States. Many individuals in the utility industry, who may be considering Imposing generation costs on transmission services, have been closely monitoring NSP's case which is currently before the Federal Energy Regulatory Commission (FERC). NSP's innovative generation costs include charges for reactive power production, frequency control, load dispatching, and load following. The results of this case may also have an important impact on the future of open transmission tariffs. Rates for these services depend on the customer's classification as either a captive or through-system consumer. The proposed tariff raises critical issues related to the costing of these transmission services. NSP's methodology has caused serious concern because the proposed tariff would increase transmission costs by an average of 53%. This paper will discuss the benefits of transmission, proposed rates, contract terms, and costing methodologies of NSP's plan

  20. Nuclear stopping in transmission experiments

    International Nuclear Information System (INIS)

    Glazov, Lev G.; Sigmund, Peter

    2003-01-01

    Energy-loss spectra, mean and peak energy loss, and straggling due to elastic nuclear scattering have been studied theoretically as a function of target thickness and deflection angle of an initially monochromatic and well-collimated ion beam. The goal of this work has been to provide a generally valid scheme for nuclear-stopping corrections, allowing to determine electronic-stopping forces from energy-loss spectra measured in transmission geometry. Calculations have been based on the generalized Bothe-Landau theory of energy loss and multiple scattering. Our peak energy losses at zero emergence angle show close (∼10%) agreement with predictions of Fastrup et al. on the basis of the Bohr-Williams theory. However, predicted mean and peak energy losses are found to more sensitively depend on the underlying interatomic potential than unrestricted, i.e. angle-integrated mean or peak energy losses. Both elastic energy loss and multiple scattering are known to obey scaling laws involving only two combinations of the pertinent variables and atomic parameters. The dependence on deflection angle and foil thickness of mean and peak energy loss obeys a simple combination of these scaling laws. Comments are made on potential errors due to uncertainties in the nuclear-stopping correction applied in the literature with specific reference to central papers in low-velocity stopping

  1. Beta attenuation transmission system (BATS)

    Energy Technology Data Exchange (ETDEWEB)

    Hagan, R.C.; Fullbright, H.J.

    1977-01-01

    The beta attenuation transmission system (BATS) is an automated radiation gauge designed for quantitative measurement of component thickness in explosive detonators. The BATS was designed and built by Group M-1, the Nondestructive Testing Group, of the Los Alamos Scientific Laboratory to measure the areal thickness, in mg/cm/sup 2/, of a cylinder of high explosive (HE) enclosed within a plastic holder. The problem is to determine the density of the HE. A /sup 90/Sr source is collimated by a 0.25 x 1.59-mm slit, and the transmitted beta-particle flux is detected by a plastic scintillator, coupled to a photomultiplier tube. The detonator is transported through the radiation beam by a leadscrew, ballnut, stepping-motor combination. Continuous analog position data are available, derived from the output from a linear-actuated potentiometer attached to the scanner. A linear electrometer amplifies the detected signal, which is then integrated for a preselected time, to obtain the desired statistical accuracy. A microprocessor (..mu..P) is used to control the scanner position and to make the data readings at the assigned positions. The data are stored, and, at the completion of the scan, are processed into the desired format. The final answer is displayed to the operator or output to a peripheral device for permanent record. The characteristics of the radiation source, the collimator, the signal detection and conditioning, and the final results are described in detail. The scanner and the microprocessor control system are briefly outlined.

  2. Monochromated scanning transmission electron microscopy

    International Nuclear Information System (INIS)

    Rechberger, W.; Kothleitner, G.; Hofer, F.

    2006-01-01

    Full text: Electron energy-loss spectroscopy (EELS) has developed into an established technique for chemical and structural analysis of thin specimens in the (scanning) transmission electron microscope (S)TEM. The energy resolution in EELS is largely limited by the stability of the high voltage supply, by the resolution of the spectrometer and by the energy spread of the source. To overcome this limitation a Wien filter monochromator was recently introduced with commercially available STEMs, offering the advantage to better resolve EELS fine structures, which contain valuable bonding information. The method of atomic resolution Z-contrast imaging within an STEM, utilizing a high-angle annular dark-field (HAADF) detector can perfectly complement the excellent energy resolution, since EELS spectra can be collected simultaneously. In combination with a monochromator microscope not only high spatial resolution images can be recorded but also high energy resolution EELS spectra are attainable. In this work we investigated the STEM performance of a 200 kV monochromated Tecnai F20 with a high resolution Gatan Imaging Filter (HR-GIF). (author)

  3. Preserving information in neural transmission.

    Science.gov (United States)

    Sincich, Lawrence C; Horton, Jonathan C; Sharpee, Tatyana O

    2009-05-13

    Along most neural pathways, the spike trains transmitted from one neuron to the next are altered. In the process, neurons can either achieve a more efficient stimulus representation, or extract some biologically important stimulus parameter, or succeed at both. We recorded the inputs from single retinal ganglion cells and the outputs from connected lateral geniculate neurons in the macaque to examine how visual signals are relayed from retina to cortex. We found that geniculate neurons re-encoded multiple temporal stimulus features to yield output spikes that carried more information about stimuli than was available in each input spike. The coding transformation of some relay neurons occurred with no decrement in information rate, despite output spike rates that averaged half the input spike rates. This preservation of transmitted information was achieved by the short-term summation of inputs that geniculate neurons require to spike. A reduced model of the retinal and geniculate visual responses, based on two stimulus features and their associated nonlinearities, could account for >85% of the total information available in the spike trains and the preserved information transmission. These results apply to neurons operating on a single time-varying input, suggesting that synaptic temporal integration can alter the temporal receptive field properties to create a more efficient representation of visual signals in the thalamus than the retina.

  4. Transmission of Helicobacter pylori Infection

    Directory of Open Access Journals (Sweden)

    Giuseppina Oderda

    1999-01-01

    Full Text Available Helicobacter pylori infection is one of the most common bacterial infections worldwide. It is accepted as the major cause of chronic gastritis, peptic ulcer, carcinoma of the distal part of the stomach and gastric lymphoma. However, how and when the infection is acquired remain largely unknown. Identification of mode of transmission is vital for developing preventive measures to interrupt its spread, but studies focused on this issue are difficult to implement. From epidemiological studies, it is known that there are great differences in the prevalence of infection in different populations and in ethnic groups originating from high prevalence regions. This is likely related to inferior hygienic conditions and sanitation. In developing countries, infection occurs at a much earlier age. In developed countries, the prevalence of infection is related to poor socioeconomic conditions, particularly density of living. Humans seem to be the only reservoir of H pylori, which spread from person to person by oral-oral, fecal-oral or gastro-oral routes. Most infections are acquired in childhood, possibly from parents or other children living as close contacts. Infection from the environment or from animals cannot be entirely excluded.

  5. Beta attenuation transmission system (BATS)

    International Nuclear Information System (INIS)

    Hagan, R.C.; Fullbright, H.J.

    1977-01-01

    The beta attenuation transmission system (BATS) is an automated radiation gauge designed for quantitative measurement of component thickness in explosive detonators. The BATS was designed and built by Group M-1, the Nondestructive Testing Group, of the Los Alamos Scientific Laboratory to measure the areal thickness, in mg/cm 2 , of a cylinder of high explosive (HE) enclosed within a plastic holder. The problem is to determine the density of the HE. A 90 Sr source is collimated by a 0.25 x 1.59-mm slit, and the transmitted beta-particle flux is detected by a plastic scintillator, coupled to a photomultiplier tube. The detonator is transported through the radiation beam by a leadscrew, ballnut, stepping-motor combination. Continuous analog position data are available, derived from the output from a linear-actuated potentiometer attached to the scanner. A linear electrometer amplifies the detected signal, which is then integrated for a preselected time, to obtain the desired statistical accuracy. A microprocessor (μP) is used to control the scanner position and to make the data readings at the assigned positions. The data are stored, and, at the completion of the scan, are processed into the desired format. The final answer is displayed to the operator or output to a peripheral device for permanent record. The characteristics of the radiation source, the collimator, the signal detection and conditioning, and the final results are described in detail. The scanner and the microprocessor control system are briefly outlined

  6. Risk Analysis using Corrosion Rate Parameter on Gas Transmission Pipeline

    Science.gov (United States)

    Sasikirono, B.; Kim, S. J.; Haryadi, G. D.; Huda, A.

    2017-05-01

    In the oil and gas industry, the pipeline is a major component in the transmission and distribution process of oil and gas. Oil and gas distribution process sometimes performed past the pipeline across the various types of environmental conditions. Therefore, in the transmission and distribution process of oil and gas, a pipeline should operate safely so that it does not harm the surrounding environment. Corrosion is still a major cause of failure in some components of the equipment in a production facility. In pipeline systems, corrosion can cause failures in the wall and damage to the pipeline. Therefore it takes care and periodic inspections or checks on the pipeline system. Every production facility in an industry has a level of risk for damage which is a result of the opportunities and consequences of damage caused. The purpose of this research is to analyze the level of risk of 20-inch Natural Gas Transmission Pipeline using Risk-based inspection semi-quantitative based on API 581 associated with the likelihood of failure and the consequences of the failure of a component of the equipment. Then the result is used to determine the next inspection plans. Nine pipeline components were observed, such as a straight pipes inlet, connection tee, and straight pipes outlet. The risk assessment level of the nine pipeline’s components is presented in a risk matrix. The risk level of components is examined at medium risk levels. The failure mechanism that is used in this research is the mechanism of thinning. Based on the results of corrosion rate calculation, remaining pipeline components age can be obtained, so the remaining lifetime of pipeline components are known. The calculation of remaining lifetime obtained and the results vary for each component. Next step is planning the inspection of pipeline components by NDT external methods.

  7. Thai gas expansion plans

    International Nuclear Information System (INIS)

    Hayes, D.

    2001-01-01

    Demand for natural gas in Thailand is increasing significantly as the Electricity Generating Authority of Thailand and the independent private power producers (IPPs) switch from oil to gas to fire their power stations in line with Government policy to reduce oil imports and use more gas from the Gulf of Thailand. The Petroleum Authority of Thailand (PTT) has the sole right to buy and sell natural gas and other petroleum products in Thailand. According to PTT, the surge in demand for natural gas in the first half of 2001 was matched by a fall in demand for refined oil products. The PTT has received Government approval to convert to a limited company ready for listing on the Thai Stock Exchange. This is expected to further increase gas consumption. Details of gas sales to power generation and other industrial sectors by PTT and Unocal, Thailand's largest producer, are given. PTT operations include work to extend its gas pipeline transmission system. A number of new pipeline schemes are planned, including one across southern Thailand to transfer offshore gas from the Joint Development Area gas field owned by Thailand and Malaysia. This has encountered protests over the proposed plant and pipeline route

  8. UHV A.C. transmission: Technology and prospects

    International Nuclear Information System (INIS)

    Cauzillo, B.A.; Manzoni, G.; Nicolini, P.

    1992-04-01

    At the beginning of the 70's, UHV transmission was regarded as imminent in many countries in view of the expected concentration of generating units (possibly of the nuclear type and grouped together in a few large plants, each of several GW), and research projects were therefore launched in the U.S.A., Canada, Italy, Japan, USSR, etc. Nowadays, the expected introduction of UHV transmission seems remote due to the slowdown in electricity growth and to the tendency towards distributed generation. Nevertheless, there are exceptions: the 1,200 kV 2,400 km-long transmission system in operation in Siberia-Kazahkstan-Urals, and the 1,100 kV 200 km double-circuit line under construction in Japan (which will, however, be operated at 500 kV up to the end of the century). In addition, in Italy, the research programme of a 1000 kV project has now been completed and a 1,050 kV pilot plant is under construction in Tuscany, consisting of a short 1,050kV line and a 420/1,050 kV 1,200 MVA substation. The technology of UHV AC transmission has therefore been proved effective and may represent an available option for the power systems of the next century. From the power system planning point-of-view, UHV's favourable characteristics lie in the possibility of transmitting large amount of power, of the order of 5 GW per circuit, with lower costs, reduced losses, and less land occupation than in the case of EHV lines

  9. Quantifying Transmission Investment in Malaria Parasites.

    Directory of Open Access Journals (Sweden)

    Megan A Greischar

    2016-02-01

    Full Text Available Many microparasites infect new hosts with specialized life stages, requiring a subset of the parasite population to forgo proliferation and develop into transmission forms. Transmission stage production influences infectivity, host exploitation, and the impact of medical interventions like drug treatment. Predicting how parasites will respond to public health efforts on both epidemiological and evolutionary timescales requires understanding transmission strategies. These strategies can rarely be observed directly and must typically be inferred from infection dynamics. Using malaria as a case study, we test previously described methods for inferring transmission stage investment against simulated data generated with a model of within-host infection dynamics, where the true transmission investment is known. We show that existing methods are inadequate and potentially very misleading. The key difficulty lies in separating transmission stages produced by different generations of parasites. We develop a new approach that performs much better on simulated data. Applying this approach to real data from mice infected with a single Plasmodium chabaudi strain, we estimate that transmission investment varies from zero to 20%, with evidence for variable investment over time in some hosts, but not others. These patterns suggest that, even in experimental infections where host genetics and other environmental factors are controlled, parasites may exhibit remarkably different patterns of transmission investment.

  10. Wireless transmission: state of research, applications, trends

    International Nuclear Information System (INIS)

    Berger, A.

    2016-01-01

    At the end of the 19th century Nikola Tesla started his work in the field of wireless energy transmission. More than 100 years after Tesla, the progress in modern semiconductor technology offer developers the possibility to realize highly efficient systems and have led to a revival of wireless energy transmission. The application ranges from the transmission of a few milliwatts in biomedical applications, over a few watts for the charging of mobile phones, to hundreds of kilowatts in the automotive sector. Depending on the used method, the possible transmission distances vary between a few centimeters up to thousands of kilometers. The physical basis of these technologies is the transmission of energy by electromagnetic waves. State-of-the-art systems use wavelengths ranging from radio waves to microwaves, to ultraviolet light. Current research focuses on optimizing transmission efficiency, increasing the possible transmission distance between transmitter and receiver, and improving spatial freedom of movement. This lecture gives an overview of the different approaches of wireless energy transmission and their physical background, the established industrial standards and the current state of research. In addition, the advantages and disadvantages of the individual methods are illustrated by selected commercial and scientific applications. (rössner) [de

  11. Virus isolation: Specimen type and probable transmission

    Indian Academy of Sciences (India)

    First page Back Continue Last page Overview Graphics. Virus isolation: Specimen type and probable transmission. Over 500 CHIK virus isolations were made. 4 from male Ae. Aegypti (?TOT). 6 from CSF (neurological involvement). 1 from a 4-day old child (transplacental transmission.

  12. Transmission tariffs - Principles, structure, aims and demands

    International Nuclear Information System (INIS)

    Groenli, Helle; Sand, Kjell

    1997-11-01

    The report deals with several optimization techniques for increasing the efficiency of electric grid operation in Norway. Methods and tools used for the determination of transmission costs are discussed such as partial transmission tariffs and Ramsey-pricing etc. 7 refs., 13 figs., 6 tabs

  13. Contract networks for competition in transmission grids

    International Nuclear Information System (INIS)

    Hogan, W.W.

    1992-01-01

    Increased reliance on competition in energy markets requires pricing, access, and investment reform for the essential transmission grids. Due to the complexity of the network interactions, the usual analogies to economic concepts from other settings have little or no meaning in transmission grids. A contract network framework builds from first principles to define the conditions of an efficient market. 8 refs

  14. The interior transmission spectrum in one dimension

    International Nuclear Information System (INIS)

    Hickmann, Kyle S

    2012-01-01

    This paper seeks conditions on acoustic profiles c(x) and b(x) which imply the existence of intervals free of transmission eigenvalues. The existence of intervals free of transmission eigenvalues has important implications in the question of unique recovery of the acoustic profile for inverse acoustic scattering theory using the linear sampling method and for the inverse source problem in thermoacoustic tomography. We examine the interior transmission spectrum relative to two acoustic profiles on the unit interval. This research includes the case when the difference of the two acoustic profiles changes sign and is, to the author's knowledge, the only work to date on the interior transmission spectrum allowing this behavior. It is shown that for a large class of acoustic profiles the transmission spectrum is asymptotically sparse. The spectrum exhibits three distinct types of behavior dependent on the relation of the two acoustic profiles. Numerical examples of each type of behavior are given which show how the transmission eigenvalues are distributed depending on the relation between c(x) and b(x). Our method of study is to reduce the interior transmission problem on [0, 1] to a problem of finding roots of a determinant of fundamental solutions to a Sturm–Liouville problem. The asymptotic expansion of solutions of the Sturm–Liouville problem then allows us to analyze properties of the transmission spectrum for large values of the wavenumber. (paper)

  15. Gear shift strategies for automotive transmissions

    NARCIS (Netherlands)

    Ngo, D.V.

    2012-01-01

    The development history of automotive engineering has shown the essential role of transmissions in road vehicles primarily powered by internal combustion engines. The engine with its physical constraints on the torque and speed requires a transmission to have its power converted to the drive power

  16. Transmission dynamics and resistance in staphylococci

    NARCIS (Netherlands)

    Hetem, D.J.

    2015-01-01

    This thesis will focus on nosocomial transmission and resistance of S. aureus and CoNS. After the general introduction on S. aureus and coagulase-negative staphylococci, part II focuses on the nosocomial transmission capacity of different MRSA clones in the hospital setting. In chapter 2 the

  17. Transmission : roadway to a competitive electricity market

    Energy Technology Data Exchange (ETDEWEB)

    Thon, S. [AltaLink L.P., AB (Canada)

    2002-07-01

    Having a variety of suppliers, marketers and retailers is the key to developing a successful electricity market which is more competitive on pricing, with less price volatility, more innovative customer products and higher levels of customer services. Some areas of Alberta are developing their own power markets with limited capacity to interact. These include Pincher Creek, Empress, Calgary, Edmonton, and Fort McMurray. It was noted that increasing transmission capacity is the key to ensuring a bigger and more competitive electricity market. Transmission constraints only encourage a small number of suppliers to control the market. The current cost of transmission capacity accounts for less than 5 per cent of an average residential customer's bill, but it plays a major role in providing more choice to competitive electricity suppliers. Developing more transmission capacity will create an even more competitive market that benefits both consumers and suppliers. Prices in Alberta have been very volatile in the past couple of years because of supply and demand issues, and there is a need to increase market liquidity. Alberta's Transmission Administrator is looking to expand the transmission network to alleviate constraints and to lower the cost of power generation, regardless of location. These expansions are not expected to affect customers' bills by more than 2 to 3 per cent. Such transmission concerns are being felt all over North America. The Federal Energy Regulatory Commission (FERC) in the United States also recognizes the link between transmission and creating a competitive electricity market.

  18. Elephant-to-Human Transmission of Tuberculosis

    Centers for Disease Control (CDC) Podcasts

    This podcast reports on the transmission of TB from elephants to humans. Dr. Rendi Murphree, Epidemic Intelligence Service Officer at the Centers for Disease Control and Prevention and Vanderbilt University Visiting Scholar, discusses the recent elephant-to-human transmission of tuberculosis at an elephant refuge in Tennessee.

  19. Wireless Transmission of Big Data: A Transmission Time Analysis over Fading Channel

    KAUST Repository

    Wang, Wen-Jing; Yang, Hong-Chuan; Alouini, Mohamed-Slim

    2018-01-01

    In this paper, we investigate the transmission time of a large amount of data over fading wireless channel with adaptive modulation and coding (AMC). Unlike traditional transmission systems, where the transmission time of a fixed amount of data is typically regarded as a constant, the transmission time with AMC becomes a random variable, as the transmission rate varies with the fading channel condition. To facilitate the design and optimization of wireless transmission schemes for big data applications, we present an analytical framework to determine statistical characterizations for the transmission time of big data with AMC. In particular, we derive the exact statistics of transmission time over block fading channels. The probability mass function (PMF) and cumulative distribution function (CDF) of transmission time are obtained for both slow and fast fading scenarios. We further extend our analysis to Markov channel, where transmission time becomes the sum of a sequence of exponentially distributed time slots. Analytical expression for the probability density function (PDF) of transmission time is derived for both fast fading and slow fading scenarios. These analytical results are essential to the optimal design and performance analysis of future wireless transmission systems for big data applications.

  20. Wireless Transmission of Big Data: A Transmission Time Analysis over Fading Channel

    KAUST Repository

    Wang, Wen-Jing

    2018-04-10

    In this paper, we investigate the transmission time of a large amount of data over fading wireless channel with adaptive modulation and coding (AMC). Unlike traditional transmission systems, where the transmission time of a fixed amount of data is typically regarded as a constant, the transmission time with AMC becomes a random variable, as the transmission rate varies with the fading channel condition. To facilitate the design and optimization of wireless transmission schemes for big data applications, we present an analytical framework to determine statistical characterizations for the transmission time of big data with AMC. In particular, we derive the exact statistics of transmission time over block fading channels. The probability mass function (PMF) and cumulative distribution function (CDF) of transmission time are obtained for both slow and fast fading scenarios. We further extend our analysis to Markov channel, where transmission time becomes the sum of a sequence of exponentially distributed time slots. Analytical expression for the probability density function (PDF) of transmission time is derived for both fast fading and slow fading scenarios. These analytical results are essential to the optimal design and performance analysis of future wireless transmission systems for big data applications.

  1. Peculiarities of Pattern Information Transmission

    Directory of Open Access Journals (Sweden)

    Evgeniy V. Yurkevich

    2017-01-01

    Full Text Available The rates of modern technologies development is such that educational programs are constantly required to be enlarged with new material. However, the introduced supplements often do not take into account the limited possibilities of perceiving amounts of information offered in class. As a result, a significant number of graduates get diplomas of educational institutions with a number of pathologies. Despite heavy load during training, the knowledge of a graduate is often not enough to recognize him ready to participate in modern production. The problem of providing quality education by creating a technology making it possible to maximize students’ knowledge while reducing the number of messages transmitted in the classroom. Consideration of the educational process in the form of an information system with messages transmitted in the form of images is proposed as one of the ways of solving it. The work assumed that each message is reflected in the consciousness of the source and receiver of information in the form of mental images. Mental images of the teacher and student are considered as a convolution of information. The analysis of peculiarities of mental images formation and development is given, a model of the mechanism of pattern information transmission is proposed. The model of transmitting sign, pattern, and symbol information is described. The communication bandwidth between the participants  of the educational process is considered as depending on their goal setting, training, physiological and emotional features, as well as a number of other non-formalized factors. Graduates of educational institutions are considered as means of producing intellectual products, and the purpose of obtaining knowledge is proposed to be formed based on the definition of the attractor of developing the “teacher-student” system. A principle of organizing educational processes is proposed: the education technology should not violate the consistency

  2. Gas transmission : a paradigm shift

    International Nuclear Information System (INIS)

    Cornelson, D.W.

    1997-01-01

    The evolution of energy markets in North America was discussed. The investment opportunities that are possible in a deregulated energy market, be it in production or in the generation of energy commodities, in the development of midstream infrastructure, or in the provision of energy services, were outlined. Deregulation of crude oil, natural gas and electricity has resulted in significant changes in the structure of energy markets and the way in which customers are served. One of the advantages of competition regarding power generation is that it has turned energy into a commodity which has resulted in greater customer choice and efficiency. As one example of midstream infrastructure development, the Alliance Pipeline project was described. This project was conceived as a means to enhance the value of western Canadian natural gas. The 1,900 mile pipeline will run from British Columbia, through Alberta into Chicago where it will interconnect with the North American gas transmission grid. The pipeline is an efficient means of transporting energy from Western Canada to North American markets, and Alliance, as a lowest cost transporter, will continue to put pressure on the traditional infrastructure to become even more competitive at the margin. As such, Alliance represents a paradigm shift in energy transportation, and serves as an excellent example of the type of investment opportunity that a deregulated market can provide. It was suggested that innovation and competition in a deregulated North American energy market will continue to increase. As electricity is deregulated, the energy market will respond more quickly to changes in supply and demand than it did in the past, in an effort to satisfy the needs of investors and customers. This will provide increased opportunities for restructuring and further competition

  3. Plan Colombia

    Directory of Open Access Journals (Sweden)

    Noam Chomsky

    2000-12-01

    Full Text Available Colombia recibe más ayuda militar de Estados Unidos que el resto de América Latina y el Caribe unidos, y esta situación puede profundizarse con la ejecución del Plan Colombia, fundamentado en la lucha antidrogas. Sin embargo, el pais ha sido calificado con el récord en violación de derechos humanos. En este contexto se aplica la reforma económica más significativa en la década de los noventa, generando condicionantes en los procesos de integración con sus vecinos. En concordancia con el secretario de Defensa, Henry Stimson, desde los años 60 Estados Unidos estaba autorizado para controlar su propio sistema regional, mientras todos los demás intenlos serian desmantelados. La presentación ambigua de esta política del gobierno estadounidense en Colombia es cómo disociar esta guerra contra la droga y la lucha irregular contrainsurgente En Estados Unidos hay otra opinión que debe conocerse para comprender las divergencias en e! interior de dicho país. Este artículo del prestigioso profesor universitario del MU, Noam Chomsky, es un referente obligado en términos de opinión pública y académica de dimensión internacional, por el inmenso respeto que infunde tanto en América como en Europa

  4. An optimization planning technique for Suez Canal Network in Egypt

    Energy Technology Data Exchange (ETDEWEB)

    Abou El-Ela, A.A.; El-Zeftawy, A.A.; Allam, S.M.; Atta, Gasir M. [Electrical Engineering Dept., Faculty of Eng., Shebin El-Kom (Egypt)

    2010-02-15

    This paper introduces a proposed optimization technique POT for predicting the peak load demand and planning of transmission line systems. Many of traditional methods have been presented for long-term load forecasting of electrical power systems. But, the results of these methods are approximated. Therefore, the artificial neural network (ANN) technique for long-term peak load forecasting is modified and discussed as a modern technique in long-term load forecasting. The modified technique is applied on the Egyptian electrical network dependent on its historical data to predict the electrical peak load demand forecasting up to year 2017. This technique is compared with extrapolation of trend curves as a traditional method. The POT is applied also to obtain the optimal planning of transmission lines for the 220 kV of Suez Canal Network (SCN) using the ANN technique. The minimization of the transmission network costs are considered as an objective function, while the transmission lines (TL) planning constraints are satisfied. Zafarana site on the Red Sea coast is considered as an optimal site for installing big wind farm (WF) units in Egypt. So, the POT is applied to plan both the peak load and the electrical transmission of SCN with and without considering WF to develop the impact of WF units on the electrical transmission system of Egypt, considering the reliability constraints which were taken as a separate model in the previous techniques. The application on SCN shows the capability and the efficiently of the proposed techniques to obtain the predicting peak load demand and the optimal planning of transmission lines of SCN up to year 2017. (author)

  5. Green Network Planning Model for Optical Backbones

    DEFF Research Database (Denmark)

    Gutierrez Lopez, Jose Manuel; Riaz, M. Tahir; Jensen, Michael

    2010-01-01

    on the environment in general. In network planning there are existing planning models focused on QoS provisioning, investment minimization or combinations of both and other parameters. But there is a lack of a model for designing green optical backbones. This paper presents novel ideas to be able to define......Communication networks are becoming more essential for our daily lives and critically important for industry and governments. The intense growth in the backbone traffic implies an increment of the power demands of the transmission systems. This power usage might have a significant negative effect...

  6. Hanford Facility contingency plan

    International Nuclear Information System (INIS)

    Sutton, L.N.; Miskho, A.G.; Brunke, R.C.

    1993-10-01

    The Hanford Facility Contingency Plan, together with each TSD unit-specific contingency plan, meets the WAC 173-303 requirements for a contingency plan. This plan includes descriptions of responses to a nonradiological hazardous materials spill or release at Hanford Facility locations not covered by TSD unit-specific contingency plans or building emergency plans. This plan includes descriptions of responses for spills or releases as a result of transportation activities, movement of materials, packaging, and storage of hazardous materials

  7. [Basic research on BSE transmission to people].

    Science.gov (United States)

    Bodemer, W; Kaup, F J

    2002-08-01

    Prion diseases of animal and man belong to neurological diseases with amyloidal deposition of the respective proteins. As to prion disease, the cellular prionprotein is in its abnormal isoform(s) an essential component of prionprotein aggregates found in affected tissue. In contrast to all neurodegenerative diseases like Morbus Alzheimer or Huntington's disease, prion diseases are transmissible. Therefore, prion diseases were designated Transmissible Spongiform Encephalopathies (TSE). The diseases are well known since decades. Scrapie was first described around 1750, a BSE case was reported in the 1850, most likely a misdiagnosis, and in 1920/1930 the human Creutzfeldt-Jakob disease (CJD) had been described. Transmission of CJD i.e. Kuru had been suspected in the early 1950s and erronously classified as slow virus disease. The CJD transmission posed a problem to humans when transplants from CJD cases were used for treatment. Fortunately, these iatrogenic transmissions remained limited. But with the advent of BSE and appearance of variant CJD cases in the UK and some places in Europe scientists suspected that transmission from cattle to man could have happened. From animal models we know of successful transmission via several routes. Species barriers do not completely prevent transmission. Rather transmission barriers might exist controlling individual susceptibility against prions. Modes of transmission, susceptibility for transmission, identification of receptor molecules as well as molecular mechanisms of the transmission process are intensely investigated. Current knowledge let us to assume that inapparent stages of prion infection pretend a (not existing) species barrier. This inapparent infection preceeds overt disease and, thus, most re-search focuses on the development of highly sensitive assay systems for detection of minute amounts of pathological prionprotein in suspected cases. Inapparence also should warn us to underestimate BSE or human vCJD cases; at

  8. European and national network development plan; Europaeischer und nationaler Netzentwicklungsplan

    Energy Technology Data Exchange (ETDEWEB)

    Ringel, Uwe [ONTRAS - VNG Gastransport GmbH, Leipzig (Germany)

    2011-11-15

    Even today, in the energy mix natural gas makes a significant contribution in order to achieve the climate policy goals. Thus, natural gas transmission grids will play a key role in Europe's energy supply. With the possibility of transforming excess wind power to hydrogen or synthetic methane and feeding syngas into the natural gas transmission grid, the natural gas transmission grid receive another challenging role in the future energy mix. However, this requires new approaches to all parties. In particular, consideration on the development of electricity networks in the planning of the future natural gas infrastructure have to be included.

  9. Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning

    Energy Technology Data Exchange (ETDEWEB)

    Mill, Andrew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Barbose, Galen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Seel, Joachim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Dong, Changgui [National Renewable Energy Lab. (NREL), Golden, CO (United States); Mai, Trieu [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sigrin, Ben [National Renewable Energy Lab. (NREL), Golden, CO (United States); Zuboy, Jarrett [Independent Consultant

    2016-08-19

    The rapid growth of distributed solar photovoltaics (DPV) has critical implications for U.S. utility planning processes. This report informs utility planning through a comparative analysis of roughly 30 recent utility integrated resource plans or other generation planning studies, transmission planning studies, and distribution system plans. It reveals a spectrum of approaches to incorporating DPV across nine key planning areas, and it identifies areas where even the best current practices might be enhanced. 1) Forecasting DPV deployment: Because it explicitly captures several predictive factors, customer-adoption modeling is the most comprehensive forecasting approach. It could be combined with other forecasting methods to generate a range of potential futures. 2) Ensuring robustness of decisions to uncertain DPV quantities: using a capacity-expansion model to develop least-cost plans for various scenarios accounts for changes in net load and the generation portfolio; an innovative variation of this approach combines multiple per-scenario plans with trigger events, which indicate when conditions have changed sufficiently from the expected to trigger modifications in resource-acquisition strategy. 3) Characterizing DPV as a resource option: Today’s most comprehensive plans account for all of DPV’s monetary costs and benefits. An enhanced approach would address non-monetary and societal impacts as well. 4) Incorporating the non-dispatchability of DPV into planning: Rather than having a distinct innovative practice, innovation in this area is represented by evolving methods for capturing this important aspect of DPV. 5) Accounting for DPV’s location-specific factors: The innovative propensity-to-adopt method employs several factors to predict future DPV locations. Another emerging utility innovation is locating DPV strategically to enhance its benefits. 6) Estimating DPV’s impact on transmission and distribution investments: Innovative practices are being

  10. Planning for a Distributed Disruption: Innovative Practices for Incorporating Distributed Solar into Utility Planning

    Energy Technology Data Exchange (ETDEWEB)

    Mills, Andrew D.; Barbose, Galen L.; Seel, Joachim; Dong, Changgui; Mai, Trieu; Sigrin, Ben; Zuboy, Jarett

    2016-08-01

    The rapid growth of distributed solar photovoltaics (DPV) has critical implications for U.S. utility planning processes. This report informs utility planning through a comparative analysis of roughly 30 recent utility integrated resource plans or other generation planning studies, transmission planning studies, and distribution system plans. It reveals a spectrum of approaches to incorporating DPV across nine key planning areas, and it identifies areas where even the best current practices might be enhanced. (1) Forecasting DPV deployment: Because it explicitly captures several predictive factors, customer-adoption modeling is the most comprehensive forecasting approach. It could be combined with other forecasting methods to generate a range of potential futures. (2) Ensuring robustness of decisions to uncertain DPV quantities: using a capacity-expansion model to develop least-cost plans for various scenarios accounts for changes in net load and the generation portfolio; an innovative variation of this approach combines multiple per-scenario plans with trigger events, which indicate when conditions have changed sufficiently from the expected to trigger modifications in resource-acquisition strategy. (3) Characterizing DPV as a resource option: Today's most comprehensive plans account for all of DPV's monetary costs and benefits. An enhanced approach would address non-monetary and societal impacts as well. (4) Incorporating the non-dispatchability of DPV into planning: Rather than having a distinct innovative practice, innovation in this area is represented by evolving methods for capturing this important aspect of DPV. (5) Accounting for DPV's location-specific factors: The innovative propensity-to-adopt method employs several factors to predict future DPV locations. Another emerging utility innovation is locating DPV strategically to enhance its benefits. (6) Estimating DPV's impact on transmission and distribution investments: Innovative

  11. Network expansion by a proactive transmission system operator: A case study

    International Nuclear Information System (INIS)

    Groppi, Angelamaria; Fumagalli, Elena

    2014-01-01

    Complex planning procedures often amplify the difference in investment time between generation and transmission. In this work we consider a transmission project in Italy and, relying on a recently proposed methodology, we compare costs and benefits of anticipating the planning process before the connection of new power plants becomes certain. Whereas the system faces lower congestion costs if the network is reinforced immediately, anticipation constitutes a sunk cost in case generation is not built. For realistic load and generation scenarios, anticipation costs, as well as differences in investment times, our results indicate that anticipation is the most efficient choice for a relatively low connection probability. Analyses of this sort are particularly relevant in light of the increasing complexity of public engagement processes and of the remarkable growth in renewable generation. - Highlights: • Delays in transmission investments can increase congestion costs. • Anticipating a transmission upgrade before a generator connects has costs/benefits. • Case study: real-life transmission project in the North of Italy. • Anticipation is the efficient choice under several scenarios

  12. Tracing overhead transmission line corridors with regard to environmental and spatial qualities

    Directory of Open Access Journals (Sweden)

    Alenka Cof

    2005-01-01

    Full Text Available The article deals with possibilities for running the proposed overhead transmission line Okroglo-Italian border. The Slovene and Italian methods are shown as methods enabling consideration of environmental and spatial impact within the process of planning overhead transmission line corridors. The Slovene method consists of analyses of attractiveness and vulnerability, whereby the first considers those functional and economic factors that affect spatial attractiveness for overhead transmission lines. Thus we can assess the level of economic and functional suitability of alternative routes of the proposed 400 kilovolt overhead transmission line from transformation station Okroglo (Slovenia to Srednje, Golo Brdo and Vrtojba, three potential contact points on the Slovene–Italian border. In accordance with stipulations of the Law on spatial management vulnerability models were prepared, which were used to simulate the development’s potential negative environmental effects and to analyse suitability, which implies harmonisation of development and protection demands. Their result is a possible corridor that can be developed without significant conflicts. The Italian procedure was developed to trace the transmission line corridor from the Slovenian border to the transformation station in Udine. It was also applied on the Slovenian side. Three groups of factors were considered in the procedure: exclusion, repulsion, and attraction. The much simpler procedure enables comparisons, since it uses the same or at least similar spatial data. In conclusion a short commentary is added about the corridor concept as a planning tool.

  13. Weather Regulates Location, Timing, and Intensity of Dengue Virus Transmission between Humans and Mosquitoes.

    Science.gov (United States)

    Campbell, Karen M; Haldeman, Kristin; Lehnig, Chris; Munayco, Cesar V; Halsey, Eric S; Laguna-Torres, V Alberto; Yagui, Martín; Morrison, Amy C; Lin, Chii-Dean; Scott, Thomas W

    2015-01-01

    % resolution. Local duration in limited areas of temperature-humidity weather-space identifies potential locations, timing, and magnitude of transmission. The weather-space profile of transmission-potential provides needed data that define a systematic and highly-sensitive weather-disease connection, demonstrating separate but coupled roles of temperature and humidity. New insights regarding natural regulation of human-mosquito transmission across diverse ecological settings advance our understanding of risk locally and globally for dengue and other mosquito-borne diseases and support advances in public health policy/operations, providing an evidence-base for modeling, predicting risk, and surveillance-prevention planning.

  14. Weather Regulates Location, Timing, and Intensity of Dengue Virus Transmission between Humans and Mosquitoes.

    Directory of Open Access Journals (Sweden)

    Karen M Campbell

    -100% at 1°C x 2% resolution.Local duration in limited areas of temperature-humidity weather-space identifies potential locations, timing, and magnitude of transmission. The weather-space profile of transmission-potential provides needed data that define a systematic and highly-sensitive weather-disease connection, demonstrating separate but coupled roles of temperature and humidity. New insights regarding natural regulation of human-mosquito transmission across diverse ecological settings advance our understanding of risk locally and globally for dengue and other mosquito-borne diseases and support advances in public health policy/operations, providing an evidence-base for modeling, predicting risk, and surveillance-prevention planning.

  15. Nipah virus transmission in a hamster model.

    Directory of Open Access Journals (Sweden)

    Emmie de Wit

    2011-12-01

    Full Text Available Based on epidemiological data, it is believed that human-to-human transmission plays an important role in Nipah virus outbreaks. No experimental data are currently available on the potential routes of human-to-human transmission of Nipah virus. In a first dose-finding experiment in Syrian hamsters, it was shown that Nipah virus was predominantly shed via the respiratory tract within nasal and oropharyngeal secretions. Although Nipah viral RNA was detected in urogenital and rectal swabs, no infectious virus was recovered from these samples, suggesting no viable virus was shed via these routes. In addition, hamsters inoculated with high doses shed significantly higher amounts of viable Nipah virus particles in comparison with hamsters infected with lower inoculum doses. Using the highest inoculum dose, three potential routes of Nipah virus transmission were investigated in the hamster model: transmission via fomites, transmission via direct contact and transmission via aerosols. It was demonstrated that Nipah virus is transmitted efficiently via direct contact and inefficiently via fomites, but not via aerosols. These findings are in line with epidemiological data which suggest that direct contact with nasal and oropharyngeal secretions of Nipah virus infected individuals resulted in greater risk of Nipah virus infection. The data provide new and much-needed insights into the modes and efficiency of Nipah virus transmission and have important public health implications with regards to the risk assessment and management of future Nipah virus outbreaks.

  16. Investigation of hydraulic transmission noise sources

    Science.gov (United States)

    Klop, Richard J.

    Advanced hydrostatic transmissions and hydraulic hybrids show potential in new market segments such as commercial vehicles and passenger cars. Such new applications regard low noise generation as a high priority, thus, demanding new quiet hydrostatic transmission designs. In this thesis, the aim is to investigate noise sources of hydrostatic transmissions to discover strategies for designing compact and quiet solutions. A model has been developed to capture the interaction of a pump and motor working in a hydrostatic transmission and to predict overall noise sources. This model allows a designer to compare noise sources for various configurations and to design compact and inherently quiet solutions. The model describes dynamics of the system by coupling lumped parameter pump and motor models with a one-dimensional unsteady compressible transmission line model. The model has been verified with dynamic pressure measurements in the line over a wide operating range for several system structures. Simulation studies were performed illustrating sensitivities of several design variables and the potential of the model to design transmissions with minimal noise sources. A semi-anechoic chamber has been designed and constructed suitable for sound intensity measurements that can be used to derive sound power. Measurements proved the potential to reduce audible noise by predicting and reducing both noise sources. Sound power measurements were conducted on a series hybrid transmission test bench to validate the model and compare predicted noise sources with sound power.

  17. Valuation anomalies for interconnector transmission rights

    International Nuclear Information System (INIS)

    McInerney, Celine; Bunn, Derek

    2013-01-01

    Whilst the acquisition of physical transmission interconnector rights between two or more electricity markets can be structured as spread options on the spot prices of electricity between connected markets, empirical evidence suggests that actual prices may be quite different. This raises issues for the valuation of transmission rights, particularly in the European context of market harmonisation, and the use of transmission rights with increasing levels of wind penetration. We examine the price differentials between the Irish and British electricity markets, where explicit transmission capacity auctions have been persistently undersubscribed and transmission rights acquired but not fully utilised. We find significant empirical indications that auction prices for transmission rights are undervalued against both arbitrage and spread option valuations. We also find significant power flows against the efficient price spread direction. A survey of a group of experts with an interest in trading power between Ireland and Britain inform a number of possible explanations for the apparent inefficiencies. These include ex-post pricing in the Irish market, intermittent wind and strategic behaviour by dominant firms. - Highlights: ► Valuation anomalies for transmission rights highlight lack of market integration. ► Exports constrained from market with ex post pricing and no hedging mechanisms. ► High start-up costs for balancing plant may deter exports from high wind regions. ► Deadband created by capacity payments based on flows versus availability

  18. Hysteresis in simulations of malaria transmission

    Science.gov (United States)

    Yamana, Teresa K.; Qiu, Xin; Eltahir, Elfatih A. B.

    2017-10-01

    Malaria transmission is a complex system and in many parts of the world is closely related to climate conditions. However, studies on environmental determinants of malaria generally consider only concurrent climate conditions and ignore the historical or initial conditions of the system. Here, we demonstrate the concept of hysteresis in malaria transmission, defined as non-uniqueness of the relationship between malaria prevalence and concurrent climate conditions. We show the dependence of simulated malaria transmission on initial prevalence and the initial level of human immunity in the population. Using realistic time series of environmental variables, we quantify the effect of hysteresis in a modeled population. In a set of numerical experiments using HYDREMATS, a field-tested mechanistic model of malaria transmission, the simulated maximum malaria prevalence depends on both the initial prevalence and the initial level of human immunity in the population. We found the effects of initial conditions to be of comparable magnitude to the effects of interannual variability in environmental conditions in determining malaria prevalence. The memory associated with this hysteresis effect is longer in high transmission settings than in low transmission settings. Our results show that efforts to simulate and forecast malaria transmission must consider the exposure history of a location as well as the concurrent environmental drivers.

  19. Modeling of Viral Aerosol Transmission and Detection

    KAUST Repository

    Khalid, Maryam; Amin, Osama; Ahmed, Sajid; Alouini, Mohamed-Slim

    2018-01-01

    The objective of this work is to investigate the spread mechanism of diseases in the atmosphere as an engineering problem. Among the viral transmission mechanisms that do not include physical contact, aerosol transmission is the most significant mode of transmission where virus-laden droplets are carried over long distances by wind. In this work, we focus on aerosol transmission of virus and introduce the idea of viewing virus transmission through aerosols and their transport as a molecular communication problem, where one has no control over transmission source but a robust receiver can be designed using nano-biosensors. To investigate this idea, a complete system is presented and end-toend mathematical model for the aerosol transmission channel is derived under certain constraints and boundary conditions. In addition to transmitter and channel, a receiver architecture composed of air sampler and Silicon Nanowire field effect transistor is also discussed. Furthermore, a detection problem is formulated for which maximum likelihood decision rule and the corresponding missed detection probability is discussed. At the end, simulation results are presented to investigate the parameters that affect the performance and justify the feasibility of proposed setup in related applications.

  20. Community development planning

    International Nuclear Information System (INIS)

    Gray, S.I.

    1983-01-01

    The focus of this paper will be methods of local community involvement in the community development planning efforts which will be required at the recommended sites. Community development planning will include capital improvement plans, housing plans, zoning changes, business development plans and other community service and fiscal plans required to meet the projected needs of new residents as a result of the repository construction and operation. This paper will present, (1) the need for community planning, (2) methods of responding to community planning needs, (3) current community planning issues to be addressed. 2 references, 1 figure

  1. Hanford Site Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

  2. Hanford Site Development Plan

    International Nuclear Information System (INIS)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J.; Yancey, E.F.

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs

  3. Teaching Treatment Planning.

    Science.gov (United States)

    Seligman, Linda

    1993-01-01

    Describes approach to teaching treatment planning that author has used successfully in both seminars and graduate courses. Clarifies nature and importance of systematic treatment planning, then describes context in which treatment planning seems more effectively taught, and concludes with step-by-step plan for teaching treatment planning.…

  4. Intelligent robot action planning

    Energy Technology Data Exchange (ETDEWEB)

    Vamos, T; Siegler, A

    1982-01-01

    Action planning methods used in intelligent robot control are discussed. Planning is accomplished through environment understanding, environment representation, task understanding and planning, motion analysis and man-machine communication. These fields are analysed in detail. The frames of an intelligent motion planning system are presented. Graphic simulation of the robot's environment and motion is used to support the planning. 14 references.

  5. Planning hierarchy, modeling and sdvanced planning dystems

    OpenAIRE

    Meyr, Herbert Ottmar

    2003-01-01

    Planning hierarchy, modeling and sdvanced planning dystems / B. Fleischmann, H. Meyr. - In: Supply chain management / ed. by A. G. de Kok ... - Amsterdam u.a. : Elsevier, 2003. - (Handbooks in operations research and management science ; 11)

  6. Transmission delays in hardware clock synchronization

    Science.gov (United States)

    Shin, Kang G.; Ramanathan, P.

    1988-01-01

    Various methods, both with software and hardware, have been proposed to synchronize a set of physical clocks in a system. Software methods are very flexible and economical but suffer an excessive time overhead, whereas hardware methods require no time overhead but are unable to handle transmission delays in clock signals. The effects of nonzero transmission delays in synchronization have been studied extensively in the communication area in the absence of malicious or Byzantine faults. The authors show that it is easy to incorporate the ideas from the communication area into the existing hardware clock synchronization algorithms to take into account the presence of both malicious faults and nonzero transmission delays.

  7. Integrated approach to transmission services pricing

    International Nuclear Information System (INIS)

    Yu, C.W.; David, A.K.

    1999-01-01

    The paper presents an intuitively logical split between: (a) embedded, (b) operating, and (c) expansion cost based pricing and methodologies for implementation, for transmission services. A conceptually straightforward mechanism for the equitable allocation of transmission network embedded cost recovery based on capacity-use and reliability benefit is proposed, expansion cost is charged on a long-run marginal cost basis and finally, operating cost recovery is based on short-run marginal pricing. This is followed by co-ordinating these alternatives and integrating the pricing mechanisms to achieve appropriate price signals for bulk power users of transmission systems. (author)

  8. Methicillin-resistant Staphylococcus aureus transmission

    DEFF Research Database (Denmark)

    Andersen, Leif Percival; Nielsen, Xiaohui

    2015-01-01

    INTRODUCTION: Even though methicillin-resistant Staphylococcus aureus (MRSA) is a common cause of nosocomial infections, it may often be difficult to evaluate the exact route of transmission. METHODS: In this study, we describe four cases of nosocomial transmission of MRSA in a hospital with a low...... increase the risk of contaminating hands, arms and the front of the uniform. Hand hygiene is therefore essential, but the use of protection gowns with long sleeves is also important in order to prevent transmission of MRSA. After culture of MRSA and implementation of specific precautions to prevent...

  9. Financial planning

    OpenAIRE

    Χατζηγώγου, Αρτεμις Π.

    2003-01-01

    Σκοπός της μελέτης αυτής, είναι η συγκέντρωση όλων των στοιχείων εκείνων που συνθέτουν μια οργανωμένη διαδικασία έρευνας, που είναι γνωστή ως Financial Planning. Θα μπορούσαμε εναλλακτικά να πούμε, ότι βασικά ο χρηματοοικονομικός σχεδιασμός προγραμματίζει, εξευρίσκει και χρησιμοποιεί τα κεφάλαια με τέτοιο τρόπο ώστε η συνεισφορά τους να είναι μεγαλύτερη στην αποτελεσματική λειτουργία της οικονομικής μονάδας. Παρέχει τις γνώσεις των χρηματιστικών αγορών από όπου αντλούνται τα κεφάλαια. Οδηγεί ...

  10. SimWIND: A geospatial infrastructure model for optimizing wind power generation and transmission

    International Nuclear Information System (INIS)

    Phillips, Benjamin R.; Middleton, Richard S.

    2012-01-01

    Wind is a clean, enduring energy resource with the capacity to satisfy 20% or more of U.S. electricity demand. Presently, wind potential is limited by a paucity of electrical transmission lines and/or capacity between promising wind resources and primary load centers. We present the model SimWIND to address this shortfall. SimWIND is an integrated optimization model for the geospatial arrangement and cost minimization of wind-power generation–transmission–delivery infrastructure. Given a set of possible wind-farm sites, the model simultaneously determines (1) where and how much power to generate and (2) where to build new transmission infrastructure and with what capacity in order to minimize the cost for delivering a targeted amount of power to load. Costs and routing of transmission lines consider geographic and social constraints as well as electricity losses. We apply our model to the Electric Reliability Council of Texas (ERCOT) Interconnection, considering scenarios that deliver up to 20 GW of new wind power. We show that SimWIND could potentially reduce ERCOT's projected ∼$5B transmission network upgrade line length and associated costs by 50%. These results suggest that SimWIND's coupled generation–transmission–delivery modeling approach could play a critical role in enhancing planning efforts and reducing costs for wind energy integration. - Highlights: ► Wind power is limited by transmission capacity between resources and demands. ► SimWIND is a coupled generation-transmission-delivery model for wind infrastructure. ► The model minimizes costs considering realistic transmission routing and networking. ► We show that SimWIND could save 50% of $5B costs for expanding the Texas grid. ► Results suggest SimWIND may play a critical role in enhancings wind planning efforts.

  11. AUTOMOTIVE DIESEL MAINTENANCE 2. UNIT II, MECHANICAL TRANSMISSIONS.

    Science.gov (United States)

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 25-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF MECHANICAL TRANSMISSIONS USED ON DIESEL POWERED VEHICLES. TOPICS ARE (1) PURPOSE OF TRANSMISSIONS, (2) RATIO DIFFERENCE, (3) CONSTANT MESH TRANSMISSIONS, (4) FOUR-SPEED TRUCK TRANSMISSION POWER FLOW, AND (5) TRANSMISSION TROUBLESHOOTING.…

  12. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-62) - Rocky Reach - Maple Valley

    Energy Technology Data Exchange (ETDEWEB)

    Martin, Mark A. [Bonneville Power Administration (BPA), Portland, OR (United States)

    2002-04-16

    Vegetation Management along the Rocky Reach – Maple Valley No. 1 Transmission Line ROW from structure 98/2 to structure 110/1. The transmission line is a 500 kV line. BPA proposes to clear targeted vegetation along access roads and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation management along existing access road and around structure landings for the purpose of maintaining access to structures site. All work will be in accordance with the National Electrical Safety Code and BPA standards.

  13. Engineering science research issues in high power density transmission dynamics for aerospace applications. [rotorcraft geared rotors

    Science.gov (United States)

    Singh, Rajendra; Houser, Donald R.

    1993-01-01

    This paper discusses analytical and experimental approaches that will be needed to understand dynamic, vibro-acoustic and design characteristics of high power density rotorcraft transmissions. Complexities associated with mathematical modeling of such systems will be discussed. An overview of research work planned during the next several years will be presented, with emphasis on engineering science issues such as gear contact mechanics, multi-mesh drive dynamics, parameter uncertainties, vibration transmission through bearings, and vibro-acoustic characteristics of geared rotor systems and housing-mount structures. A few examples of work in progress are cited.

  14. A Practical Radiosity Method for Predicting Transmission Loss in Urban Environments

    Directory of Open Access Journals (Sweden)

    Liang Ming

    2004-01-01

    Full Text Available The ability to predict transmission loss or field strength distribution is crucial for determining coverage in planning personal communication systems. This paper presents a practical method to accurately predict entire average transmission loss distribution in complicated urban environments. The method uses a 3D propagation model based on radiosity and a simplified city information database including surfaces of roads and building groups. Narrowband validation measurements with line-of-sight (LOS and non-line-of-sight (NLOS cases at 1800 MHz give excellent agreement in urban environments.

  15. International benchmarking of electricity transmission by regulators: A contrast between theory and practice?

    International Nuclear Information System (INIS)

    Haney, Aoife Brophy; Pollitt, Michael G.

    2013-01-01

    Benchmarking of electricity networks has a key role in sharing the benefits of efficiency improvements with consumers and ensuring regulated companies earn a fair return on their investments. This paper analyses and contrasts the theory and practice of international benchmarking of electricity transmission by regulators. We examine the literature relevant to electricity transmission benchmarking and discuss the results of a survey of 25 national electricity regulators. While new panel data techniques aimed at dealing with unobserved heterogeneity and the validity of the comparator group look intellectually promising, our survey suggests that they are in their infancy for regulatory purposes. In electricity transmission, relative to electricity distribution, choosing variables is particularly difficult, because of the large number of potential variables to choose from. Failure to apply benchmarking appropriately may negatively affect investors’ willingness to invest in the future. While few of our surveyed regulators acknowledge that regulatory risk is currently an issue in transmission benchmarking, many more concede it might be. In the meantime new regulatory approaches – such as those based on tendering, negotiated settlements, a wider range of outputs or longer term grid planning – are emerging and will necessarily involve a reduced role for benchmarking. -- Highlights: •We discuss how to benchmark electricity transmission. •We report survey results from 25 national energy regulators. •Electricity transmission benchmarking is more challenging than benchmarking distribution. •Many regulators concede benchmarking may raise capital costs. •Many regulators are considering new regulatory approaches

  16. The US market for high-temperature superconducting wire in transmission cable applications

    Energy Technology Data Exchange (ETDEWEB)

    Forbes, D

    1996-04-01

    Telephone interviews were conducted with 23 utility engineers concerning the future prospects for high-temperature superconducting (HTS) transmission cables. All have direct responsibility for transmission in their utility, most of them in a management capacity. The engineers represented their utilities as members of the Electric Power Research Institute`s Underground Transmission Task Force (which has since been disbanded). In that capacity, they followed the superconducting transmission cable program and are aware of the cryogenic implications. Nineteen of the 23 engineers stated the market for underground transmission would grow during the next decade. Twelve of those specified an annual growth rate; the average of these responses was 5.6%. Adjusting that figure downward to incorporate the remaining responses, this study assumes an average growth rate of 3.4%. Factors driving the growth rate include the difficulty in securing rights-of-way for overhead lines, new construction techniques that reduce the costs of underground transmission, deregulation, and the possibility that public utility commissions will allow utilities to include overhead costs in their rate base. Utilities have few plans to replace existing cable as preventive maintenance, even though much of the existing cable has exceeded its 40-year lifetime. Ten of the respondents said the availability of a superconducting cable with the same life-cycle costs as a conventional cable and twice the ampacity would induce them to consider retrofits. The respondents said a cable with those characteristics would capture 73% of their cable retrofits.

  17. Maintenance Business Plans.

    Science.gov (United States)

    Adams, Matt

    2002-01-01

    Discusses maintenance business plans, statements which provide accountability for facilities maintenance organizations' considerable budgets. Discusses the plan's components: statement of plan objectives, macro and detailed description of the facility assets, maintenance function descriptions, description of key performance indicators, milestone…

  18. Calfornia General Plans

    Data.gov (United States)

    California Natural Resource Agency — We undertook creating the first ever seamless statewide General Plan map for California. All county general plans and many city general plans were integrated into 1...

  19. Understanding health insurance plans

    Science.gov (United States)

    ... page: //medlineplus.gov/ency/patientinstructions/000879.htm Understanding health insurance plans To use the sharing features on this ... plan for you and your family. Types of Health Insurance Plans Depending on how you get your health ...

  20. Superconducting power transmission: the perils and promise

    Energy Technology Data Exchange (ETDEWEB)

    Forsyth, E B

    1976-06-01

    The development of bulk electricity transmission systems must be considered in the light of changing growth rates, increasing resistances to ehv overhead transmission and the tendency to concentrate generation in fewer sites. Helium-cooled or superconducting cables possess technical characteristics which will make them suitable as utility network components for power transmission over distances of ten to several hundred miles. These properties are illustrated by considering two applications in existing electrical networks. The first is a 43 mile system to transmit 4800 MVA and the second is a potential application under study in Pennsylvania to transmit 10,000 MVA over a distance of 350 miles or so. Helium-cooled versions of these transmission systems were designed to permit technical and economic evaluations. The major groups and institutions throughout the world engaged in the development of helium-cooled cables are listed and aspects of the technical approaches are briefly described.

  1. Depistage clinique des infections sexuellement transmissibles chez ...

    African Journals Online (AJOL)

    Depistage clinique des infections sexuellement transmissibles chez les personnes vivant avec le VIH suivies au Centre de Traitement Ambulatoire du Centre National Hospitalier Universitaire Hubert Koutoukou Maga de Cotonou.

  2. Prevalence of Human Immunodeficiency Virus Transmission among ...

    African Journals Online (AJOL)

    sex, and social status with the subjects served as control. Voluntary counseling ... to HIV antibody. Conclusions: Blood transfusion is still a risk factor for HIV transmission .... 1.6% documented by Al-Mahroos and Ebrahim[15] in Bahrain. Island.

  3. Feasibility study of wireless power transmission systems

    Science.gov (United States)

    Robinson, W. J., Jr.

    1968-01-01

    Wireless microwave or laser energy transfers power from a manned earth-orbiting central station to unmanned astronomical substations. More efficient systems are required for the microwave power transmission.

  4. High Voltage Power Transmission for Wind Energy

    Science.gov (United States)

    Kim, Young il

    The high wind speeds and wide available area at sea have recently increased the interests on offshore wind farms in the U.S.A. As offshore wind farms become larger and are placed further from the shore, the power transmission to the onshore grid becomes a key feature. Power transmission of the offshore wind farm, in which good wind conditions and a larger installation area than an onshore site are available, requires the use of submarine cable systems. Therefore, an underground power cable system requires unique design and installation challenges not found in the overhead power cable environment. This paper presents analysis about the benefit and drawbacks of three different transmission solutions: HVAC, LCC/VSC HVDC in the grid connecting offshore wind farms and also analyzed the electrical characteristics of underground cables. In particular, loss of HV (High Voltage) subsea power of the transmission cables was evaluated by the Brakelmann's theory, taking into account the distributions of current and temperature.

  5. Transfusion transmissible viral infections among potential blood ...

    African Journals Online (AJOL)

    effective approach for prevention and control of transfusion-transmissible infections (TTIs). Also, it has been documented that sub-standard test kits are mostly used in resource limited settings for transfusion related diagnosis. However, the role of ...

  6. ORIGINAL ARTICLES HIV transmission during paediatric health ...

    African Journals Online (AJOL)

    prevalence in paediatric health care settings in Africa, risks for horizontal ... 29 West Governer Road, Hershey, Pennsylvania, USA. David Gisselquist, PhD ..... tolerance policy for HIV transmission through health care. February 2004, Vol.

  7. 4th International Conference on Power Transmissions

    CERN Document Server

    2013-01-01

    This books contains the Proceedings of the 4th International Conference on Power Transmissions, that was held in Sinaia, Romania from June 20 -23, 2012. Power Transmissions is a very complex and multi-disciplinary scientific field of Mechanical Engineering that covers the different types of transmissions (mechanical, hydraulic, pneumatic) as well as all the machine elements involved, such as gears, bearings, shafts, couplings and a lot more. It concerns not only their basic theory but also their design, analysis, testing, application and maintenance. The requirements set to modern power transmissions are really tough to meet: They need to be more efficient, stronger, smaller, noiseless, easier to produce and to cost less. There is a strong demand to become easier in operation and maintenance, or even automatic and in maintenance-free. Last but not least, they should be easily recycled and respect the environment. Joint efforts of specialists from both academia and industry can significantly contribute to fulf...

  8. The global transmission network of HIV-1.

    Science.gov (United States)

    Wertheim, Joel O; Leigh Brown, Andrew J; Hepler, N Lance; Mehta, Sanjay R; Richman, Douglas D; Smith, Davey M; Kosakovsky Pond, Sergei L

    2014-01-15

    Human immunodeficiency virus type 1 (HIV-1) is pandemic, but its contemporary global transmission network has not been characterized. A better understanding of the properties and dynamics of this network is essential for surveillance, prevention, and eventual eradication of HIV. Here, we apply a simple and computationally efficient network-based approach to all publicly available HIV polymerase sequences in the global database, revealing a contemporary picture of the spread of HIV-1 within and between countries. This approach automatically recovered well-characterized transmission clusters and extended other clusters thought to be contained within a single country across international borders. In addition, previously undescribed transmission clusters were discovered. Together, these clusters represent all known modes of HIV transmission. The extent of international linkage revealed by our comprehensive approach demonstrates the need to consider the global diversity of HIV, even when describing local epidemics. Finally, the speed of this method allows for near-real-time surveillance of the pandemic's progression.

  9. Acoustic wave transmission through piezoelectric structured materials.

    Science.gov (United States)

    Lam, M; Le Clézio, E; Amorín, H; Algueró, M; Holc, Janez; Kosec, Marija; Hladky-Hennion, A C; Feuillard, G

    2009-05-01

    This paper deals with the transmission of acoustic waves through multilayered piezoelectric materials. It is modeled in an octet formalism via the hybrid matrix of the structure. The theoretical evolution with the angle and frequency of the transmission coefficients of ultrasonic plane waves propagating through a partially depoled PZT plate is compared to finite element calculations showing that both methods are in very good agreement. The model is then used to study a periodic stack of 0.65 PMN-0.35 PT/0.90 PMN-0.10 PT layers. The transmission spectra are interpreted in terms of a dispersive behavior of the critical angles of longitudinal and transverse waves, and band gap structures are analysed. Transmission measurements confirm the theoretical calculations and deliver an experimental validation of the model.

  10. Enhanced infrared transmission characteristics of microwave ...

    Indian Academy of Sciences (India)

    2017-09-22

    Sep 22, 2017 ... ods result in grain growth, which adversely influences the transmission .... dispersing the powder in methanol and allowing a drop of this to become dry on a ... out in a resistive–microwave hybrid furnace with silicon car-.

  11. Biosignatures of Exposure/Transmission and Immunity.

    Science.gov (United States)

    King, Christopher L; Davies, D Huw; Felgner, Phil; Baum, Elizabeth; Jain, Aarti; Randall, Arlo; Tetteh, Kevin; Drakeley, Christopher J; Greenhouse, Bryan

    2015-09-01

    A blood test that captures cumulative exposure over time and assesses levels of naturally acquired immunity (NAI) would provide a critical tool to monitor the impact of interventions to reduce malaria transmission and broaden our understanding of how NAI develops around the world as a function of age and exposure. This article describes a collaborative effort in multiple International Centers of Excellence in Malaria Research (ICEMRs) to develop such tests using malaria-specific antibody responses as biosignatures of transmission and immunity. The focus is on the use of Plasmodium falciparum and Plasmodium vivax protein microarrays to identify a panel of the most informative antibody responses in diverse malaria-endemic settings representing an unparalleled spectrum of malaria transmission and malaria species mixes before and after interventions to reduce malaria transmission. © The American Society of Tropical Medicine and Hygiene.

  12. Tendon Force Transmission at the Nanoscale

    DEFF Research Database (Denmark)

    Svensson, René

    2013-01-01

    of connective tissue function that are poorly understood. One such aspect is the microscopic mechanisms of force transmission through tendons over macroscopic distances. Force transmission is at the heart of tendon function, but the large range of scales in the hierarchical structure of tendons has made...... it difficult to tackle. The tendon hierarchy ranges from molecules (2 nm) over fibrils (200 nm), fibers (2 μm) and fascicles (200 μm) to tendons (10 mm), and to derive the mechanisms of force transmission it is necessary to know the mechanical behavior at each hierarchical level. The aim of the present work...... was to elucidate the mechanisms of force transmission in tendons primarily by investigating the mechanical behavior at the hierarchical level of collagen fibrils. To do so we have developed an atomic force microscopy (AFM) method for tensile testing of native collagen fibrils. The thesis contains five papers...

  13. VT Electric Transmission Line Corridors - corridor lines

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The ELTRN layer depicts electric transmission line corridors in Vermont. Various methods have been used to digitize features. The data layer...

  14. VT Electric Transmission Line Corridors - substation points

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The ELTRN layer depicts electric transmission line corridors in Vermont. Various methods have been used to digitize features. The data layer...

  15. Transmission character of general function photonic crystals

    Science.gov (United States)

    Wu, Xiang-Yao; Zhang, Bo-Jun; Yang, Jing-Hai; Zhang, Si-Qi; Liu, Xiao-Jing; Wang, Jing; Ba, Nuo; Hua, Zhong; Yin, Xin-Guo

    2012-08-01

    In the paper, we present a new general function photonic crystals (GFPCs), whose refractive index of medium is a arbitrary function of space position. Unlike conventional photonic crystals (PCs), whose structure grows from two mediums A and B, with different constant refractive indexes na and nb. Based on the Fermat principle, we give the motion equations of light in one-dimensional GFPCs, and calculate its transfer matrix, which is different from the conventional PCs. We choose the linearity refractive index function for two mediums A and B, and find the transmissivity of one-dimensional GFPCs can be much larger or smaller than 1 for different slope linearity refractive index functions, which are different from the transmissivity of conventional PCs (its transmissivity is in the range of 0 and 1). Otherwise, we study the effect of different incident angles, the number of periods and optical thickness on the transmissivity, and obtain some new results different from the conventional PCs.

  16. The ground based plan

    International Nuclear Information System (INIS)

    1989-01-01

    The paper presents a report of ''The Ground Based Plan'' of the United Kingdom Science and Engineering Research Council. The ground based plan is a plan for research in astronomy and planetary science by ground based techniques. The contents of the report contains a description of:- the scientific objectives and technical requirements (the basis for the Plan), the present organisation and funding for the ground based programme, the Plan, the main scientific features and the further objectives of the Plan. (U.K.)

  17. Housing and the Monetary Transmission Mechanism

    OpenAIRE

    Frederic S. Mishkin

    2007-01-01

    The housing market is of central concern to monetary policy makers. To achieve the dual goals of price stability and maximum sustainable employment, monetary policy makers must understand the role that housing plays in the monetary transmission mechanism if they are to set policy instruments appropriately. In this paper, I examine what we know about the role of housing in the monetary transmission mechanism and then explore the implications of this knowledge for the conduct of monetary policy...

  18. A macroecological characterization of infectious disease transmission:

    DEFF Research Database (Denmark)

    Andersen-Ranberg, Emilie Ulrikka

    2017-01-01

    Presentation: Per M. Jensen*, Miguel L. Grilo, Christian B. Pipper, Emilie U. Andersen-Ranberg. A macroecological characterization of infectious disease transmission: the cases of Mycobacterium and Leptospira sp. The 2017 OIKOS meeting, 10th -11th March 2017, Copenhagen, Denmark......Presentation: Per M. Jensen*, Miguel L. Grilo, Christian B. Pipper, Emilie U. Andersen-Ranberg. A macroecological characterization of infectious disease transmission: the cases of Mycobacterium and Leptospira sp. The 2017 OIKOS meeting, 10th -11th March 2017, Copenhagen, Denmark...

  19. Electric power transmission pricing regulations and efficiency

    International Nuclear Information System (INIS)

    Goldoni, G.

    1999-01-01

    An efficient-price mechanism for electricity transmission is very hard to find, essentially because of the natural monopoly condition of the grid and its peculiar interactions with generation. The use of Optimal Power Flow Models is difficult to implement and could be easily distorted by strategical behaviour of generators. These models, however, could became a valuable efficiency-test for actual transmission charges and codes [it

  20. Spectrally efficient polymer optical fiber transmission

    Science.gov (United States)

    Randel, Sebastian; Bunge, Christian-Alexander

    2011-01-01

    The step-index polymer optical fiber (SI-POF) is an attractive transmission medium for high speed communication links in automotive infotainment networks, in industrial automation, and in home networks. Growing demands for quality of service, e.g., for IPTV distribution in homes and for Ethernet based industrial control networks will necessitate Gigabit speeds in the near future. We present an overview on recent advances in the design of spectrally efficient and robust Gigabit-over-SI-POF transmission systems.