WorldWideScience

Sample records for fr23jy10n procurement list

  1. 78 FR 75912 - Procurement List; Addition and Deletion

    Science.gov (United States)

    2013-12-13

    ... and Deletion AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Addition to and deletion from the Procurement List. SUMMARY: This action adds a service to the Procurement...: General Services Administration, Fort Worth, TX Deletion On 11/1/2013 (78 FR 65618), the Committee for...

  2. 78 FR 27369 - Procurement List; Additions and Deletion

    Science.gov (United States)

    2013-05-10

    ... and Deletion AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Additions to and Deletion from the Procurement List. SUMMARY: This action adds products to the Procurement..., Philadelphia, PA. Deletion On 4/5/2013 (78 FR 20622-20623), the Committee for Purchase From People Who Are...

  3. 75 FR 47550 - Procurement List; Additions

    Science.gov (United States)

    2010-08-06

    ...--Macintosh Apple NSN: MR 473--Fresh Linen NPA: Industries for the Blind, Inc., West Allis, WI Contracting... Service, 5777 S. Aviation Blvd., N. Charleston, SC NPA: Goodwill Industries of Lower South Carolina, Inc... Procurement List. SUMMARY: This action adds products and services to the Procurement List that will be...

  4. 75 FR 69638 - Procurement List; Additions and Deletion

    Science.gov (United States)

    2010-11-15

    ... and Deletion AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Additions to and deletion from the Procurement List. SUMMARY: This action adds products and a service to the...), DENVER, CO. Deletion On 9/17/2010 (75 FR 56995-56996), the Committee for Purchase From People Who Are...

  5. 76 FR 43988 - Procurement List; Additions

    Science.gov (United States)

    2011-07-22

    ... this work, based on applicable experience. Finally, the purpose of the JWOD Act and the responsibility... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Additions... Procurement List. SUMMARY: This action adds products and services to the Procurement List that will be...

  6. 78 FR 37525 - Procurement List; Deletions

    Science.gov (United States)

    2013-06-21

    .... Contracting Activity: Dept of the Air Force, FA7014 AFDW A7KI, Andrews AFB, MD. Service Type/Location: Laundry... Procurement List. SUMMARY: This action deletes products and services from the Procurement List that were... products and services listed below are no longer suitable for procurement by the Federal Government under...

  7. 75 FR 49481 - Procurement List; Additions and Deletion

    Science.gov (United States)

    2010-08-13

    ... added to the Procurement List: Services Service Type/Locations: Laundry Service, Atlanta VA Medical...: Additions to and deletion from the Procurement List. SUMMARY: This action adds services to the Procurement... disabilities and deletes a service from the Procurement List previously furnished by such agency. DATES...

  8. 78 FR 21916 - Procurement List; Addition And Deletions

    Science.gov (United States)

    2013-04-12

    ..., the following service is added to the Procurement List: Service Service Type/Location: Laundry Service...: Addition to and Deletions from the Procurement List. SUMMARY: This action adds a service to the Procurement... disabilities, and deletes products and services from the Procurement List previously furnished by such agencies...

  9. 75 FR 22745 - Procurement List Additions

    Science.gov (United States)

    2010-04-30

    ... General Services Administration. Services Service Type/Location: Laundry Services, Alaska VA Healthcare... Procurement List. SUMMARY: This action adds to the Procurement List products and services to be furnished by... concerning capability of qualified nonprofit agencies to provide the products and services and impact of the...

  10. 77 FR 27736 - Procurement List Additions

    Science.gov (United States)

    2012-05-11

    ... Research Laboratory, Washington, DC. Service Type/Location: Laundry, Refurbishment, and Warehouse Services... Procurement List. SUMMARY: This action adds products and services to the Procurement List that will be... products and services and impact of the additions on the current or most recent contractors, the Committee...

  11. 76 FR 26279 - Procurement List; Proposed Additions

    Science.gov (United States)

    2011-05-06

    ...-service area; clean and sanitize food service equipment, utensil cleaning, and dishwashing; clean pots... additions to the Procurement List. SUMMARY: The Committee is proposing to add services to the Procurement... in this notice will be required to procure the services listed below from nonprofit agencies...

  12. 76 FR 80345 - Procurement List; Additions

    Science.gov (United States)

    2011-12-23

    ... ARMY, W6QL ECC MIAMI DIV, MIAMI, FL. Service Type/Location: Industrial Laundry Service, Bureau of... Procurement List. SUMMARY: This action adds services to the Procurement List that will be provided by... concerning capability of qualified nonprofit agencies to provide the services and impact of the additions on...

  13. 78 FR 45183 - Procurement List Additions

    Science.gov (United States)

    2013-07-26

    ... Requirement as aggregated by the General Services Administration. NSN: 7920-00-NIB-0564--Towel, Cleaning, Non... Procurement List. SUMMARY: This action adds a products and services to the Procurement List that will be... presented to it concerning capability of qualified nonprofit agencies to provide the products and services...

  14. 75 FR 14576 - Procurement List Additions

    Science.gov (United States)

    2010-03-26

    ... Inspection Service, Minneapolis, MN. M.R. Laundry Products NSN: MR 1103--Heavy Duty Laundry Bag. NSN: MR 1104... procurement list. SUMMARY: This action adds to the Procurement List products and services to be furnished by... products and services and impact of the additions on the current or most recent contractors, the Committee...

  15. 78 FR 48656 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-08-09

    ... Oceanic and Atmospheric Administration, Boulder, CO. Service Type/Location: Laundry Service, US Coast... Additions to the Procurement List. SUMMARY: The Committee is proposing to add products and services to the... required to procure the products and services listed below from nonprofit agencies employing persons who...

  16. 76 FR 78248 - Procurement List; Addition and Deletions

    Science.gov (United States)

    2011-12-16

    .... Service Type/Location: Laundry Service, Stratton Medical Center, 113 Holland Ave, Albany, NY. [[Page 78249...: Addition to and Deletions from the Procurement List. SUMMARY: This action adds a service to the Procurement... disabilities, and deletes products and services from the Procurement List previously furnished by such agencies...

  17. 77 FR 29596 - Procurement List Proposed Additions

    Science.gov (United States)

    2012-05-18

    .../Location: Laundry Service, Veterans Administration Medical Center (VAMC), (offsite: 1809 W 2nd Avenue... Additions to the Procurement List. SUMMARY: The Committee is proposing to add products and services to the... identified in this notice will be required to procure the products and services listed below from nonprofit...

  18. 78 FR 53733 - Procurement List Additions and Deletions

    Science.gov (United States)

    2013-08-30

    .../Location: Industrial Laundry Service, Bureau of Engraving and Printing, 9000 Blue Mound Road, Fort Worth...: Additions to and Deletions from the Procurement List. SUMMARY: This action adds products and services to the... severe disabilities, and deletes services from the Procurement List previously provided by such agencies...

  19. 76 FR 37069 - Procurement List; Proposed Additions and Deletion

    Science.gov (United States)

    2011-06-24

    ... Certification The following products and service are proposed for addition to Procurement List for production by... following product is proposed for deletion from the Procurement List: Product Detergent, Laundry NSN: 7930...

  20. 78 FR 35874 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-06-14

    ... proposed for addition to the Procurement List for production by the nonprofit agencies listed: Products... Cleaner NPA: Winston-Salem Industries for the Blind, Inc., Winston-Salem, NC Contracting Activity: Defense...

  1. 78 FR 21348 - Procurement List; Additions and Deletions; Recissions

    Science.gov (United States)

    2013-04-10

    ... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Additions and Deletions; Recissions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Rescission of Previous Procurement List Decision. SUMMARY: The Committee for Purchase...

  2. 78 FR 40727 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-07-08

    ... for addition to the Procurement List for production by the nonprofit agencies listed: Products Towel.... 12/BX Cleaner, Brake Parts NSN: 6850-01-167-0678--17 oz. NPA: The Lighthouse for the Blind, St. Louis...

  3. 78 FR 38953 - Procurement List Additions

    Science.gov (United States)

    2013-06-28

    ... Blind or Severely Disabled published notices of proposed additions to the Procurement List. After... Punch, Paper, Desktop, 3-Hole, Adjustable, 11 sheet capacity, Metallic Base, Black Grip. Coverage: A...

  4. 78 FR 12295 - Procurement List; Additions

    Science.gov (United States)

    2013-02-22

    ... published notices of proposed additions to the Procurement List. After consideration of the material..., 508 Compliant, 12 Digit, Portable, Desktop, Battery Operated NPA: MidWest Enterprises for the Blind...

  5. 78 FR 73504 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-12-06

    ... Logistics Support Detachment, Undisclosed Location*, Ft. Belvoir, VA. NPA: MVLE, Inc., Springfield, VA. Contracting Activity: Directorate of Contracting Procurement Logistics Support Detachment, Fort Belvoir, VA.... Lineback, Director, Business Operations. [FR Doc. 2013-29139 Filed 12-5-13; 8:45 am] BILLING CODE 6353-01-P ...

  6. 76 FR 66913 - Procurement List Proposed Additions and Deletions

    Science.gov (United States)

    2011-10-28

    ...&M, Philadelphia, PA. Service Service Type/Location: Industrial Laundry Service, Bureau of Engraving... proposing to add products and service to the Procurement List that will be furnished by nonprofit agencies... identified in this notice will be required to procure the products and service listed below from nonprofit...

  7. 75 FR 36363 - Procurement List: Proposed Additions and Deletions

    Science.gov (United States)

    2010-06-25

    ... Homeland Security, U.S. Coast Guard, Washington, DC Service Type/Location: Laundry Service, USDA National... proposing to add products and services to the Procurement List that will be furnished by nonprofit agencies... Government identified in this notice will be required to procure the products and services listed below from...

  8. 76 FR 57719 - Procurement List; Proposed Additions

    Science.gov (United States)

    2011-09-16

    ... proposed for addition to the Procurement List for production by the nonprofit agencies listed: Products NSN: 7930-00-NIB-0583--Refills, Bathroom Cleaner and Deodorizer, Cartridge Concentrate. NSN: 7930-00-NIB-0584--Starter Kit, Bathroom Cleaner and Deodorizer, Cartridge Concentrate. NSN: 7930-00-NIB-0585...

  9. 76 FR 5142 - Procurement List; Additions and Deletion

    Science.gov (United States)

    2011-01-28

    ... and Deletion AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Additions to and deletion from the Procurement List. SUMMARY: This action adds services to the Procurement.... Contracting Activity: Department of Transportation, Federal Aviation Administration, Jamaica, NY. Deletion On...

  10. 75 FR 41449 - Procurement List Additions and Deletion

    Science.gov (United States)

    2010-07-16

    ... Customs and Border Protection, Office of Procurement, Washington, DC Service Type/Locations: Laundry.../Locations: Laundry Service, Naval Hospital System, 2800 Child Street, Jacksonville, FL NPA: GINFL Services...: Additions to and deletion from the Procurement List. SUMMARY: This action adds products and services to the...

  11. 78 FR 12296 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-02-22

    ... services are proposed for addition to the Procurement List for production by the nonprofit agencies listed... and Trailer Wash, 55 GL NSN: 7930-00-NIB-0649--Cleaner/Degreaser, Heavy Duty, Biodegradable, Car and Trucks, 5 GL NSN: 7930-00-NIB-0650--Cleaner/Degreaser, Heavy Duty, Biodegradable, Car and Trucks, 55 GL...

  12. 76 FR 14942 - Procurement List; Additions and Deletions

    Science.gov (United States)

    2011-03-18

    ... DFAC. Service Type/Location: Laundry & Dry Cleaning Service, F.E. Warren, AFB, WY. NPA: Goodwill... Service Type/Location: Laundry Service, Atlanta VA Medical Center, Decatur, GA. NPA: GINFL Services, Inc...: Additions to and deletions from the Procurement List. SUMMARY: This action adds services to the Procurement...

  13. 78 FR 59658 - Procurement List; Additions

    Science.gov (United States)

    2013-09-27

    ... Accordingly, the following products and services are added to the Procurement List: Products Laundry Net... ADMINISTRATION, BOULDER, CO. Service Type/Location: Laundry Service, US Coast Guard Base, Portsmouth, VA. NPA... GUARD, BASE PORTSMOUTH, PORTSMOUTH, VA Service Type/Location: Laundry Service, Federal Bureau of Prisons...

  14. 77 FR 60969 - Procurement List; Additions

    Science.gov (United States)

    2012-10-05

    ... Are Blind or Severely Disabled published a notice for additions to the Procurement List with the... Committee for Purchase From People Who Are Blind or Severely Disabled published notices of proposed..., Phoenix, AZ. Service Type/Location: Custodial and Grounds Maintenance Services, Austin Courthouse, 501...

  15. 78 FR 34351 - Procurement List; Additions

    Science.gov (United States)

    2013-06-07

    .... ADDRESSES: Committee for Purchase from People Who are Blind or Severely Disabled, 1401 S. Clark Street... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Additions AGENCY: Committee for Purchase from People Who are Blind or Severely Disabled. ACTION: Additions to the...

  16. 77 FR 70738 - Procurement List Additions

    Science.gov (United States)

    2012-11-27

    ... Fire Fighters, Metal NSN: CBFF0053--Nameplate, Navy Fire Fighters, 2 Line, Metal NSN: CBFF0054--Collar, Brass, Navy Fire Fighters, Metal NSN: CBFF0055--Shorts, Navy Fire Fighters, Physical Training, Small... following products are added to the Procurement List: PRODUCTS: NSN: CBFF0001--Shirt, Navy Fire Fighters...

  17. 77 FR 62219 - Procurement List; Proposed Additions and Deletions

    Science.gov (United States)

    2012-10-12

    ... addition to the Procurement List for production by the nonprofit agencies listed: Services Service Type... Maritime, Columbus, OH. SKILCRAFT-Spartan Chemical Cleaners NSN: 7930-00-NIB-0597--Tb-Cide Quat RTU...

  18. 77 FR 38775 - Procurement List; Proposed Additions and Deletions

    Science.gov (United States)

    2012-06-29

    ... addition to Procurement List for production by the nonprofit agencies listed: Products NSN: 8415-MD-001..., Blend, Santa Fe, 6/16 oz Containers. NSN: 8950-01-E62-2187--Spice, Onion, Granulated, 6/18 oz Containers...

  19. 75 FR 1355 - Procurement List Additions and Deletions

    Science.gov (United States)

    2010-01-11

    .../Location: Janitorial Services, Jamestown Service Center, 8430 Country Club Street, Jamestown, ND. NPA..., the following products and services are deleted from the Procurement List: Products Business Cards NSN...

  20. 78 FR 77105 - Procurement List; Proposed Addition

    Science.gov (United States)

    2013-12-20

    ... People Who Are Blind or Severely Disabled, 1401 S. Clark Street, Suite 10800, Arlington, Virginia, 22202... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Proposed Addition AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed...

  1. 78 FR 50040 - Procurement List, Proposed Additions

    Science.gov (United States)

    2013-08-16

    ... People Who Are Blind or Severely Disabled, 1401 S Clark Street, Suite 10800, Arlington, Virginia, 22202... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List, Proposed Additions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed...

  2. 78 FR 19248 - Procurement List; Proposed Addition

    Science.gov (United States)

    2013-03-29

    ... Purchase From People Who Are Blind or Severely Disabled, 1401 S. Clark Street, Suite 10800, Arlington... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Proposed Addition AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed...

  3. 78 FR 53734 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-08-30

    ...: Committee for Purchase From People Who Are Blind or Severely Disabled, 1401 S Clark Street, Suite 10800... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Proposed Additions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed...

  4. 75 FR 33270 - Procurement List; Proposed Additions and Deletions

    Science.gov (United States)

    2010-06-11

    ... of Veterans Affairs, VISN 7 Consolidated Contracting, Augusta, GA. Service Type/Locations: Laundry... proposing to add products and services to the Procurement List that will be furnished by nonprofit agencies... services listed below from nonprofit agencies employing persons who are blind or have other severe...

  5. 77 FR 71400 - Procurement List, Additions

    Science.gov (United States)

    2012-11-30

    .... Contracting Activity: DEFENSE LOGISTICS AGENCY TROOP SUPPORT, PHILADELPHIA, PA. Coverage: C-List for 100% of the requirement of the Department of Defense, as aggregated by the Defense Logistics Agency Troop... ARMY, W071 ENDIST KANSAS CITY, KANSAS CITY, MO. Barry S. Lineback, Director, Business Operations. [FR...

  6. 78 FR 29119 - Procurement List; Additions and Deletion

    Science.gov (United States)

    2013-05-17

    ... and Deletion AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Additions to and Deletion from the Procurement List. SUMMARY: This action adds products and services to the... Activity: Washington Headquarters Services (WHS), Acquisition Directorate, Washington, DC. Deletion On 4/5...

  7. 78 FR 73503 - Procurement List Additions and Deletions

    Science.gov (United States)

    2013-12-06

    ... by the General Services Administration. NSN: MR 376--Resealable Bags, Holiday, 6.5'' x 5.875''. NSN..., Holiday, 24PC. NPA: Winston-Salem Industries for the Blind, Inc., Winston-Salem, NC. Contracting Activity... disabilities, and deletes a product and services from the Procurement List previously furnished by such...

  8. 36 CFR Appendix E to Part 1191 - List of Figures and Index

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false List of Figures and Index E Appendix E to Part 1191 Parks, Forests, and Public Property ARCHITECTURAL AND TRANSPORTATION BARRIERS... Figures and Index ER23JY04.289 ER23JY04.290 ER23JY04.291 ER23JY04.292 ER23JY04.293 ER23JY04.294 ER23JY04...

  9. 75 FR 28589 - Procurement List Proposed Additions and Deletion

    Science.gov (United States)

    2010-05-21

    .... Service Type/Location: Laundry Service, Naval Hospital, 6000 West Hwy 98, Pensacola, FL. NPA: Wiregrass..., FL. Service Type/Location: Laundry Service, Naval Hospital System, 2800 Child Street, Jacksonville... the Procurement List products and services to be furnished by nonprofit agencies employing persons who...

  10. 75 FR 56995 - Procurement List Proposed Additions and Deletion

    Science.gov (United States)

    2010-09-17

    ... Additions and Deletion AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed Additions to and Deletion From the Procurement List. SUMMARY: The Committee is proposing to add... aggregated by the Defense Logistics Agency Troop Support, Philadelphia, PA. Deletion Regulatory Flexibility...

  11. 76 FR 60810 - Procurement List; Proposed Additions and Deletion

    Science.gov (United States)

    2011-09-30

    ... Additions and Deletion AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed Additions to and Deletion from the Procurement List. SUMMARY: The Committee is proposing to add... Activity: Department of Energy, Idaho Operations Office, Idaho Falls, ID. DELETION Regulatory Flexibility...

  12. 78 FR 45183 - Procurement List; Proposed Addition and Deletions

    Science.gov (United States)

    2013-07-26

    ... People Who Are Blind or Severely Disabled, 1401 S. Clark Street, Suite 10800, Arlington, Virginia, 22202... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Proposed Addition and Deletions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled...

  13. 78 FR 68823 - Procurement List Proposed Additions and Deletions

    Science.gov (United States)

    2013-11-15

    ... for Purchase From People Who Are Blind or Severely Disabled, 1401 S. Clark Street, Suite 10800... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List Proposed Additions and Deletions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled...

  14. 78 FR 32631 - Procurement List; Proposed Additions and Deletions

    Science.gov (United States)

    2013-05-31

    ... People Who Are Blind or Severely Disabled, 1401 S. Clark Street, Suite 10800, Arlington, Virginia 22202... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Proposed Additions and Deletions AGENCY: Committee for Purchase from People Who are Blind or Severely Disabled...

  15. 78 FR 43180 - Procurement List; Proposed Additions and Deletions

    Science.gov (United States)

    2013-07-19

    ... for Purchase From People Who Are Blind or Severely Disabled, 1401 S. Clark Street, Suite 10800... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Proposed Additions and Deletions AGENCY: Committee for Purchase from People Who Are Blind or Severely Disabled...

  16. 76 FR 35415 - Procurement List; Proposed Additions and Deletions

    Science.gov (United States)

    2011-06-17

    ... Command, Natick, MA. SERVICE: Service Type/Location: Laundry Services, Department of Veterans Affairs... proposing to add products and a service to the Procurement List that will be furnished by nonprofit agencies employing persons who are blind or have other severe disabilities, and deletes products and a service...

  17. 77 FR 31335 - Procurement List; Proposed Additions and Deletion

    Science.gov (United States)

    2012-05-25

    .... Services Service Type/Location: Laundry and Dry Cleaning Service, Buckley Air Force Base Lodging & Medical... products and services to the Procurement List that will be furnished by nonprofit agencies employing persons who are blind or have other severe disabilities, and deletes a service previously provided by such...

  18. 78 FR 17641 - Procurement List; Proposed Addition and Deletion

    Science.gov (United States)

    2013-03-22

    ... People Who Are Blind or Severely Disabled, 1401 S. Clarke Street, Suite 10800, Arlington, Virginia 22202... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Proposed Addition and Deletion AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION...

  19. 76 FR 3879 - Procurement List Proposed Additions and Deletions

    Science.gov (United States)

    2011-01-21

    ... W6BB ACA White Sands Missile Range, NM. Service Type/Location: Laundry & Dry Cleaning Service, F.E... Activity: GSA/FAS Southwest Supply Center (QSDAC), Fort Worth, TX. Service Service Type/Location: Laundry... proposing to add services to the Procurement List that will be provided by nonprofit agencies employing...

  20. 75 FR 7450 - Procurement List: Proposed Addition and Deletion

    Science.gov (United States)

    2010-02-19

    ... Addition and Deletion AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed addition to and deletion from Procurement List. SUMMARY: The Committee is proposing to add to the... W6BA ACA, FT CARSON, COLORADO. Deletion Regulatory Flexibility Act Certification I certify that the...

  1. 77 FR 20795 - Procurement List Proposed Addition and Deletion

    Science.gov (United States)

    2012-04-06

    ... Addition and Deletion AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed Addition to and Deletion from the Procurement List. SUMMARY: The Committee is proposing to add a.... Deletion Regulatory Flexibility Act Certification I certify that the following action will not have a...

  2. 22 CFR 201.23 - Procurement under private sector procedures.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Procurement under private sector procedures... § 201.23 Procurement under private sector procedures. (a) General requirements. Procurements under private sector procedures will normally be carried out by importers using negotiated procurement...

  3. The distribution of polarized radio sources >15 μJy IN GOODS-N

    International Nuclear Information System (INIS)

    Rudnick, L.; Owen, F. N.

    2014-01-01

    We present deep Very Large Array observations of the polarization of radio sources in the GOODS-N field at 1.4 GHz at resolutions of 1.''6 and 10''. At 1.''6, we find that the peak flux cumulative number count distribution is N(> p) ∼ 45*(p/30 μJy) –0.6 per square degree above a detection threshold of 14.5 μJy. This represents a break from the steeper slopes at higher flux densities, resulting in fewer sources predicted for future surveys with the Square Kilometer Array and its precursors. It provides a significant challenge for using background rotation measures (RMs) to study clusters of galaxies or individual galaxies. Most of the polarized sources are well above our detection limit, and they are also radio galaxies that are well-resolved even at 10'', with redshifts from ∼0.2-1.9. We determined a total polarized flux for each source by integrating the 10'' polarized intensity maps, as will be done by upcoming surveys such as POSSUM. These total polarized fluxes are a factor of two higher, on average, than the peak polarized flux at 1.''6; this would increase the number counts by ∼50% at a fixed flux level. The detected sources have RMs with a characteristic rms scatter of ∼11 rad m –2 around the local Galactic value, after eliminating likely outliers. The median fractional polarization from all total intensity sources does not continue the trend of increasing at lower flux densities, as seen for stronger sources. The changes in the polarization characteristics seen at these low fluxes likely represent the increasing dominance of star-forming galaxies.

  4. 41 CFR 51-6.8 - Deletion of items from the Procurement List.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Deletion of items from...-PROCUREMENT PROCEDURES § 51-6.8 Deletion of items from the Procurement List. (a) When a central nonprofit... shall notify the Committee staff immediately. Before reaching a decision to request a deletion of an...

  5. 78 FR 50039 - Procurement List, Additions and Deletions

    Science.gov (United States)

    2013-08-16

    ... Committee for Purchase From People Who Are Blind or Severely Disabled published notices of proposed... Commissary Agency. NSN: 7510-00-NIB-9832--Portable Desktop Clipboard, 10'' W x 2-\\3/ 5\\'' D x 16'' H, Black. NSN: 7510-00-NIB-9833--Portable Desktop Clipboard, 10'' W x 2-\\3/ 5\\'' D x 16'' H, Blue. NSN: 7510-00...

  6. 77 FR 17034 - Procurement List; Addition

    Science.gov (United States)

    2012-03-23

    ...: Base Supply Center, National Maritime Intelligence Center/Office of Naval Intelligence, 4251 Suitland... Activity: Dept. of the Navy, Office Of Naval Intelligence, Washington, DC. Barry S. Lineback, Director, Business Operations. [FR Doc. 2012-7006 Filed 3-22-12; 8:45 am] BILLING CODE 6353-01-P ...

  7. 10 CFR 21.31 - Procurement documents.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Procurement documents. 21.31 Section 21.31 Energy NUCLEAR REGULATORY COMMISSION REPORTING OF DEFECTS AND NONCOMPLIANCE Procurement Documents § 21.31 Procurement documents. Each individual, corporation, partnership, dedicating entity, or other entity subject to the...

  8. 10 CFR 436.43 - Procurement planning.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Procurement planning. 436.43 Section 436.43 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Agency Procurement of Energy Efficient Products § 436.43 Procurement planning. (a) Agencies should consider the...

  9. 10 CFR 603.1300 - Procurement contract.

    Science.gov (United States)

    2010-01-01

    ... Used in this Part § 603.1300 Procurement contract. A Federal Government procurement contract. It is a... 10 Energy 4 2010-01-01 2010-01-01 false Procurement contract. 603.1300 Section 603.1300 Energy... Government and a State, a local government, or other non-government entity when the principal purpose of the...

  10. 75 FR 72815 - Procurement List Proposed Additions

    Science.gov (United States)

    2010-11-26

    ... Executive Office for Simulation, Training and Instrumentation (PEO STRI), 12350 Research Parkway, Orlando... Orlando, Orlando, FL. Patricia Briscoe, Deputy Director, Business Operations. [FR Doc. 2010-29753 Filed 11...

  11. E-PROCUREMENT: IMPORTANCIA Y APLICACIÓN

    Directory of Open Access Journals (Sweden)

    Isabel Fernández Quesada

    2003-04-01

    Full Text Available En el trabajo se aborda uno de los aspectos externos del e-business: el e-procurement. Se valora la importancia de la utilización de la red en general y en la función logística y de compras, en particular. Partiendo de las actividades tradicionales de compras, se explicitan las ventajas que supone respecto a ellas el e-procurement y la importancia estratégica de su aplicación. Asimismo, se profundiza en el propio concepto de e-procurement y en su arquitectura desde el punto de vista de su implantación empresarial.

  12. 77 FR 35942 - Procurement List; Proposed Additions

    Science.gov (United States)

    2012-06-15

    ... List for production by the nonprofit agencies listed: Products Hose, Fire, Orange NSN: 4210-01-131-0247.... Contracting Activity: Dept. of Housing and Urban Development, Chicago Regional Office, RCO, Chicago, IL...

  13. 77 FR 46409 - Procurement List; Additions

    Science.gov (United States)

    2012-08-03

    ... List. Binder, Loose-Leaf NSN: 7510-01-392-5283--3 D-Ring, No Overlay, Black, 5'' NSN: 7510-01-495-0696... Requirement as aggregated by the General Services Administration. Copy Paper, 100% Recycled, Convenience Pack...

  14. 76 FR 76808 - Procurement Thresholds for Implementation of the Trade Agreements Act of 1979

    Science.gov (United States)

    2011-12-08

    ... Organization (WTO) Agreement on Government Procurement, Chapter 15 of the United States-Australia Free Trade... out U.S. trade agreement obligations under the WTO Agreement on Government Procurement, Chapter 15 of... Agreement on Government Procurement A. Central Government Entities Listed in U.S. Annex 1 (1) Procurement of...

  15. 76 FR 57719 - Procurement List; Additions

    Science.gov (United States)

    2011-09-16

    ..., DEVELOPMENT, & ENGINEERING COMMAND (RDECOM), NATICK, MA. Coverage: C-List for 100% of the requirement the Department of the Army, as aggregated by the Department of the Army Research, Development, & Engineering...: Warehouse Staffing Services, Warehouse Section--Building Branch--NOAA's Logistics Div., Building 22, 325...

  16. 77 FR 4283 - Procurement List; Additions

    Science.gov (United States)

    2012-01-27

    .... of Jefferson County, Fort Atkinson, WI. Contracting Activity: Defense Logistics Agency Land and... aggregated by the Defense Logistics Agency Land and Maritime, Columbus, OH. NSN: 8040-00-NIB-0019--Dispenser... Activity: General Services Administration, Kansas City, MO. Coverage: B-List for the Broad Government...

  17. 77 FR 32592 - Procurement List; Additions

    Science.gov (United States)

    2012-06-01

    ..., Lawrence, KS. Contracting Activity: Defense Logistics Agency Troop Support, Philadelphia, PA. Coverage: C-List for 100% of the requirement of the Department of Defense, as aggregated by the Defense Logistics... Supply Store (COCESS), 30th Civil Engineering Squadron, 1515 Iceland Avenue, Room 150, Vandenberg AFB, CA...

  18. 76 FR 75536 - Procurement List; Proposed Addition

    Science.gov (United States)

    2011-12-02

    ... listed: Service Service Type/Location: Grounds Maintenance, Beale AFB, CA. NPA: Crossroads Diversified Service, Inc., Sacramento, CA. Contracting Activity: 9th Contracting Squadron, Beale AFB, CA. Patricia...

  19. 76 FR 67370 - Federal Property Management Regulation (FPMR); Procurement Sources and Programs

    Science.gov (United States)

    2011-11-01

    ... to agency management and personnel. List of Subjects in 41 CFR Part 101-26 Procurement sources and... MANAGEMENT REGULATIONS PART 101-26--PROCUREMENT SOURCES AND PROGRAMS 0 1. The authority for 41 CFR part 101...; Docket Number 2011-017; Sequence 1] RIN 3090-AJ19 Federal Property Management Regulation (FPMR...

  20. 77 FR 51522 - Procurement List Proposed Additions

    Science.gov (United States)

    2012-08-24

    ..., Barricade, Yellow, ``CAUTION'', Premium Grade, 3''W x 1000'L COVERAGE: A-List for the Total Government... Contract OFC, Fort Belvoir, VA Patricia Briscoe, Deputy Director, Business Operations (Pricing and...

  1. 75 FR 34701 - Procurement List; Proposed Additions

    Science.gov (United States)

    2010-06-18

    ...--Scissors, Ladies Sewing; Stainless Steel Coverage: A-List for the Total Government Requirement as... SERVICE, GSA/FSS TOOLS ACQUISITION DIVISION I, KANSAS CITY, MO. Services Service Type/Location: Mess Attendant Service, 185th Air Refueling Wing Dining Hall, 2920 Headquarters Avenue, Sioux City, IA. NPA...

  2. 78 FR 45182 - Clarification of Sourcing Requirements for the Procurement List

    Science.gov (United States)

    2013-07-26

    ...) 4140.1-R, DoD Supply Chain Materiel Management Regulation, the AbilityOne Program is designating the... Defense and the General Services Administration Governing Supply Management Relationships Under the National Supply System provides DLA the authority to procure and supply certain assigned products for the...

  3. 76 FR 45542 - Procurement List; Proposed Addition

    Science.gov (United States)

    2011-07-29

    ... Feeding and Cleaning. NPA: NewView Oklahoma, Inc., Oklahoma City, OK. Contracting Activity: Defense Logistics Agency Troop Support, Philadelphia, PA. Coverage: C-List for 100% of the requirement of the Department of Defense, as aggregated by the Defense Logistics Agency Troop Support, Philadelphia, PA. Barry S...

  4. 78 FR 67129 - Procurement List; Proposed Additions and Deletions

    Science.gov (United States)

    2013-11-08

    ... List for production by the nonprofit agencies listed: Products NSN: 8455-00-NIB-0036--ID Card Holder, Dual Cards, Rigid Plastic, Black, W/Neck Lanyard. NSN: 8455-00-NIB-0037--ID Card Holder, Dual Cards, Rigid Plastic, Black. NSN: 8455-00-NIB-0039--Badge Holder, ID, Plastic, Clear, Waterproof W/Neck Lanyard...

  5. 75 FR 21244 - Procurement List; Proposed Additions and Deletions

    Science.gov (United States)

    2010-04-23

    ... List for production by the nonprofit agencies listed: Products NSN: MR 987--Towel, Super Absorbent... Agency, Fort Lee, VA. NSN: 7930-00-NIB-0553--TriBase Multi-Purpose Cleaner, 2 liter, 4/BX. NSN: 7930-00-NIB-0554--TriBase Multi-Purpose Cleaner, 55 gallon drum, 1 DR. NSN: 7930-00-NIB-0555--BioRenewable...

  6. 76 FR 28000 - Procurement List Proposed Additions and Deletions

    Science.gov (United States)

    2011-05-13

    ... Contracting Activity: GSA/FSS Household and Industrial Furniture, Arlington, VA. Coverage: A-List for the... Development of Growth & Educational Services, Inc., Pomona, CA. Contracting Activity: General Services...

  7. JY1 time scale: a new Kalman-filter time scale designed at NIST

    International Nuclear Information System (INIS)

    Yao, Jian; Parker, Thomas E; Levine, Judah

    2017-01-01

    We report on a new Kalman-filter hydrogen-maser time scale (i.e. JY1 time scale) designed at the National Institute of Standards and Technology (NIST). The JY1 time scale is composed of a few hydrogen masers and a commercial Cs clock. The Cs clock is used as a reference clock to ease operations with existing data. Unlike other time scales, the JY1 time scale uses three basic time-scale equations, instead of only one equation. Also, this time scale can detect a clock error (i.e. time error, frequency error, or frequency drift error) automatically. These features make the JY1 time scale stiff and less likely to be affected by an abnormal clock. Tests show that the JY1 time scale deviates from the UTC by less than  ±5 ns for ∼100 d, when the time scale is initially aligned to the UTC and then is completely free running. Once the time scale is steered to a Cs fountain, it can maintain the time with little error even if the Cs fountain stops working for tens of days. This can be helpful when we do not have a continuously operated fountain or when the continuously operated fountain accidentally stops, or when optical clocks run occasionally. (paper)

  8. 75 FR 10223 - Procurement List Proposed Additions and Deletions

    Science.gov (United States)

    2010-03-05

    ....gov . SUPPLEMENTARY INFORMATION: This notice is published pursuant to 41 U.S.C. 47(a)(2) and 41 CFR 51... Services, Alaska VA Healthcare System and Regional Office, Anchorage, AK NPA: MQC Enterprises, Inc., Anchorage, AK Contracting Activity: Department of Veterans Affairs, Network Business Office (10N20VBO...

  9. 78 FR 16475 - Procurement List; Proposed Additions and Deletion

    Science.gov (United States)

    2013-03-15

    ..., Inc., Indianapolis, IN Contracting Activity: Defense Logistics Agency Aviation, Richmond, VA Coverage: B-List for the Total Government Requirement as aggregated by the Defense Logistics Agency Aviation...: Dept of the Navy, NAVAL FAC Engineering CMD MID LANT, Norfolk, VA. Navy Operational Support Center Fort...

  10. 78 FR 24732 - Procurement List; Proposed Additions and Deletions

    Science.gov (United States)

    2013-04-26

    ... Services and Offender Supervision Agency (CSOSA), (offsite: 4701 Market St, Fredericksburg, VA), 633... List: Products NSN: 7530-01-588-1145--DAYMAX System, 2012, Planner, 7-hole, Digital Camouflage NSN... Deluxe Planner, 6- hole, Digital Camouflage, Black NSN: 7530-01-587-8922L--DAYMAX System, 2012, JR Deluxe...

  11. 78 FR 27368 - Procurement List; Proposed Additions and Deletions

    Science.gov (United States)

    2013-05-10

    ... interested persons an opportunity to submit comments on the proposed actions. Additions If the Committee.... IMMIGRATION AND CUSTOMS ENFORCEMENT, COMPLIANCE AND REMOVALS, WASHINGTON, DC Coverage: C-List for 100% of the requirement of the U.S. Immigration and Customs Enforcement, York, PA detainment facility, as aggregated by...

  12. 77 FR 60969 - Procurement List; Proposed Additions and Deletions

    Science.gov (United States)

    2012-10-05

    ...., Wichita, KS. Contracting Activity: Defense Logistics Agency Troop Support, Philadelphia, PA. Coverage: C-List for 100% of the requirement of the Department of Defense, as aggregated by the Defense Logistics...., Portsmouth, VA. Contracting Activity: Dept. of the Army, W071 Endist Kansas City, Kansas City, MO. Deletions...

  13. Quemaduras por frío: Revisión de 10 Años

    OpenAIRE

    EULUFÍ M, ALEX; PIÑEROS B, JOSÉ LUIS; CALDERÓN O, WILFREDO; CUADRA C, ÁLVARO; DANILLA E, STEFAN; LÉNIZ M, PATRICIO; ROCO M, HÉCTOR; ROA G, RICARDO; EULUFÍ M, CHRISTIAN

    2006-01-01

    La injuria por frío ha sido objeto de estudio desde la década de 1960, Este trabajo entrega los resultados de una revisión retrospectiva de un grupo de 10 pacientes ingresados al Hospital del Trabajador de Santiago (HTS) en un periodo de 10 años producto de accidentes laborales de distintas etiologías. Cabe señalar que solo encontramos reportes aislados de casos en la literatura revisada. Se revisaron retrospectivamente las fichas clínicas de 10 pacientes en el periodo 1993-2003. Las edades f...

  14. The Topology of Large-Scale Structure in the 1.2 Jy IRAS Redshift Survey

    Science.gov (United States)

    Protogeros, Zacharias A. M.; Weinberg, David H.

    1997-11-01

    We measure the topology (genus) of isodensity contour surfaces in volume-limited subsets of the 1.2 Jy IRAS redshift survey, for smoothing scales λ = 4, 7, and 12 h-1 Mpc. At 12 h-1 Mpc, the observed genus curve has a symmetric form similar to that predicted for a Gaussian random field. At the shorter smoothing lengths, the observed genus curve shows a modest shift in the direction of an isolated cluster or ``meatball'' topology. We use mock catalogs drawn from cosmological N-body simulations to investigate the systematic biases that affect topology measurements in samples of this size and to determine the full covariance matrix of the expected random errors. We incorporate the error correlations into our evaluations of theoretical models, obtaining both frequentist assessments of absolute goodness of fit and Bayesian assessments of models' relative likelihoods. We compare the observed topology of the 1.2 Jy survey to the predictions of dynamically evolved, unbiased, gravitational instability models that have Gaussian initial conditions. The model with an n = -1 power-law initial power spectrum achieves the best overall agreement with the data, though models with a low-density cold dark matter power spectrum and an n = 0 power-law spectrum are also consistent. The observed topology is inconsistent with an initially Gaussian model that has n = -2, and it is strongly inconsistent with a Voronoi foam model, which has a non-Gaussian, bubble topology.

  15. Procurement and participation opportunities

    International Nuclear Information System (INIS)

    Lovatt, D.

    1998-01-01

    The elements which drive the Sable Offshore Energy Project and its procurement processes were described. The project is privately financed, hence business practices must adhere to strict principles to be able to compete with alternative energy sources and to ensure success for all stakeholders including owners, contractors, suppliers and the business community. One of the objectives of the project is to adhere to the requirements of applicable legislation and not to compromise health, safety and environmental standards. To ensure this compliance by all concerned, the regulatory requirements are embedded in the contracting and procurement procedures. Details of the procurement cycle are described. A list of some of the successes that Nova Scotian companies have had in getting work on the project was provided as an illustration of the ingenuity and foresight of these companies to develop appropriate quality assurance and health, safety and environmental procedures, and to bring in the needed capacity and technology through the formation of joint ventures and alliances. The list of contracts represents more than 100 million dollars worth of work to date. 3 figs

  16. 48 CFR 970.5223-2 - Affirmative procurement program.

    Science.gov (United States)

    2010-10-01

    ... for Management and Operating Contracts 970.5223-2 Affirmative procurement program. Link to an amendment published at 75 FR 57695, Sept. 22, 2010. As prescribed in 48 CFR (DEAR) 970.2304-2, insert the...

  17. 77 FR 49783 - Procurement List; Additions

    Science.gov (United States)

    2012-08-17

    ...), Office of the Principal Legal Advisor, New York Office of Chief Counsel, 290 Broadway Street, New York, NY NPA: Fedcap Rehabilitation Services, Inc., New York, NY Contracting Activity: Dept of Homeland... ``E'' Street, Buildings 59 & 79 Magazine Road, Portsmouth, VA Washington Navy Yard, 1325 10th Street...

  18. First-time characterization of JY-1-like sequence in goats

    African Journals Online (AJOL)

    2015-07-11

    Jul 11, 2015 ... Material and Methods. Nine well-recognized .... available, the bovine JY-1 gene sequence (GenBank accession no. .... Since no phenotypes on fecundity and sexual precocity are currently available for goats, it may not be ...

  19. OAS :: Accountability :: Procurement

    Science.gov (United States)

    OAS, including its organizational structure, each organizational unit's staffing, vacant posts, and a list of procurement notices for formal bids, links to the performance contract and travel control Performance Contract reports from January 2013 to June 2017 may be found.) Travel Information and Control

  20. 75 FR 8926 - Procurement List; Additions

    Science.gov (United States)

    2010-02-26

    ...-Sided, DeCA Marketing POS Kit NSN: 9905-00-NIB-0142--Banner, DeCA Marketing Signage Kit, 3' x 10', Each NSN: 9905-00-NIB-0143--Buttons, DeCA Marketing Signage Kit, 3'', Each NSN: 9905-00-NIB-0144--Dangler, Round, Double-Sided, DeCA POS Signage NSN: 9905-00-NIB-0145--Poster, DeCA Marketing Signage Kit, 20'' x...

  1. 75 FR 2858 - Negotiation of a Reciprocal Defense Procurement Memorandum of Understanding With the Czech Republic

    Science.gov (United States)

    2010-01-19

    ... Czech Republic, the Czech Republic would be listed as one of the ``qualifying countries'' in the... With the Czech Republic AGENCY: Department of Defense (DoD). ACTION: Request for public comments... Republic. DoD is requesting industry feedback regarding its experience in public defense procurements...

  2. A cross-sectional survey of the models in Bihar and Tamil Nadu, India for pooled procurement of medicines.

    Science.gov (United States)

    Chokshi, Maulik; Farooqui, Habib Hasan; Selvaraj, Sakthivel; Kumar, Preeti

    2015-01-01

    In India, access to medicine in the public sector is significantly affected by the efficiency of the drug procurement system and allied processes and policies. This study was conducted in two socioeconomically different states: Bihar and Tamil Nadu. Both have a pooled procurement system for drugs but follow different models. In Bihar, the volumes of medicines required are pooled at the state level and rate contracted (an open tender process invites bidders to quote for the lowest rate for the list of medicines), while actual invoicing and payment are done at district level. In Tamil Nadu, medicine quantities are also pooled at state level but payments are also processed at state level upon receipt of laboratory quality-assurance reports on the medicines. In this cross-sectional survey, a range of financial and non-financial data related to procurement and distribution of medicine, such as budget documents, annual reports, tender documents, details of orders issued, passbook details and policy and guidelines for procurement were analysed. In addition, a so-called ABC analysis of the procurement data was done to to identify high-value medicines. It was observed that Tamil Nadu had suppliers for 100% of the drugs on their procurement list at the end of the procurement processes in 2006, 2007 and 2008, whereas Bihar's procurement agency was only able to get suppliers for 56%, 59% and 38% of drugs during the same period. Further, it was observed that Bihar's system was fuelling irrational procurement; for example, fluconazole (antifungal) alone was consuming 23.4% of the state's drug budget and was being procured by around 34% of the districts during 2008-2009. Also, the ratios of procurement prices for Bihar compared with Tamil Nadu were in the range of 1.01 to 22.50. For 50% of the analysed drugs, the price ratio was more than 2, that is, Bihar's procurement system was procuring the same medicines at more than twice the prices paid by Tamil Nadu. Centralized

  3. Improved Parallel Three-List Algorithm for the Knapsack Problem without Memory Conflicts

    Institute of Scientific and Technical Information of China (English)

    Pan Jun; Li Kenli; Li Qinghua

    2006-01-01

    Based on the two-list algorithm and the parallel three-list algorithm, an improved parallel three-list algorithm for knapsack problem is proposed, in which the method of divide and conquer, and parallel merging without memory conflicts are adopted. To find a solution for the n-element knapsack problem, the proposed algorithm needs O(23n/8) time when O(23n/8) shared memory units and O(2n/4) processors are available. The comparisons between the proposed algorithm and 10 existing algorithms show that the improved parallel three-list algorithm is the first exclusive-read exclusive-write (EREW) parallel algorithm that can solve the knapsack instances in less than O(2n/2) time when the available hardware resource is smaller than O(2n/2), and hence is an improved result over the past researches.

  4. Spectral intensity dependence an isotropy of sources stronger than 0.1 Jy at 2700 MHz

    International Nuclear Information System (INIS)

    Balonek, T.J.; Broderick, J.J.; Condon, J.J.; Crawford, D.F.; Jauncey, D.L.

    1975-01-01

    The 1000-foot (305 m) telescope of the National Astronomy and Ionosphere Center was used to measure 430 MHz flux densities of sources stronger than 0.1 Jy at 2700 MHz. Distributions of the resulting two-point spectral indices α (430, 2700) of sources in the intensity range 0.1less than or equal toS<0.35 Jy were compared with α (318, 2700) distributions of sources stronger than 0.35 Jy at 2700 MHz. The median normal-component spectral index and fraction of flat-spectrum sources in the faintest sample do not continue the previously discovered trend toward increased spectral steepening of faint sources. This result differs from the prediction of simple evolutionary cosmological models and therefore favors the alternative explanation that local source-density inhomogeneities are responsible for the observed intensity dependence of spectral indices

  5. 76 FR 53419 - Procurement List; Proposed Additions

    Science.gov (United States)

    2011-08-26

    ..., Arlington, Virginia 22202-3259. For Further Information or To Submit Comments Contact: Patricia Briscoe... 3 W. Broad Street, Bethlehem, PA 200 Lakeside Drive, Suite 220, Horsham, PA 601 S. Henderson Road...): PACE Enterprises of West Virginia, Inc., Star City, WV. 210 1st Street, SW., Roanoke, VA 1600 N...

  6. 76 FR 14588 - Defense Federal Acquisition Regulation Supplement; Nonavailability Exception for Procurement of...

    Science.gov (United States)

    2011-03-17

    ... Federal Acquisition Regulation Supplement; Nonavailability Exception for Procurement of Hand or Measuring... Subjects in 48 CFR Part 225 Government procurement. Ynette R. Shelkin, Editor, Defense Acquisition... requirement at 10 U.S.C. 2533a (Berry Amendment) to acquire only domestic hand or measuring tools. DATES...

  7. 17 CFR 41.23 - Listing of security futures products for trading.

    Science.gov (United States)

    2010-04-01

    ... security futures products for trading, a designated contract market or registered derivatives transaction... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Listing of security futures products for trading. 41.23 Section 41.23 Commodity and Securities Exchanges COMMODITY FUTURES TRADING...

  8. ExoMol molecular line lists - XXVI: spectra of SH and NS

    Science.gov (United States)

    Yurchenko, Sergei N.; Bond, Wesley; Gorman, Maire N.; Lodi, Lorenzo; McKemmish, Laura K.; Nunn, William; Shah, Rohan; Tennyson, Jonathan

    2018-07-01

    Line lists for the sulphur-containing molecules SH (the mercapto radical) and NS are computed as part of the ExoMol project. These line lists consider transitions within the X2Π ground state for 32SH, 33SH, 34SH,36SH and, 32SD, and 14N32S, 14N33S, 14N34S, 14N36S, and 15N32S. Ab initio potential energy (PEC) and spin-orbit coupling (SOC) curves are computed and then improved by fitting to experimentally observed transitions. Fully ab initio dipole moment curves (DMCs) computed at high level of theory are used to produce the final line lists. For SH, our fit gives a root-mean-square (rms) error of 0.03 cm-1 between the observed (vmax = 4, Jmax = 34.5) and calculated transitions wavenumbers; this is extrapolated such that all X2Π rotational-vibrational-electronic (rovibronic) bound states are considered. For 32SH the resulting line list contains about 81 000 transitions and 2300 rovibronic states, considering levels up to vmax = 14 and Jmax = 60.5. For NS the refinement used a combination of experimentally determined frequencies and energy levels and led to an rms-fitting error of 0.002 cm-1. Each NS-calculated line list includes around 2.8 million transitions and 31 000 rovibronic states with a vibrational range up to v = 53 and rotational range up to J = 235.5, which covers up to 23 000 cm-1. Both line lists should be complete for temperatures up to 5000 K. Example spectra simulated using this line list are shown and comparisons made to the existing data in the CDMS data base. The line lists are available from the CDS (http://cdsarc.u-strasbg.fr) and ExoMol (www.exomol.com) data bases.

  9. ExoMol molecular line lists - XXVI: spectra of SH and NS

    Science.gov (United States)

    Yurchenko, Sergei N.; Bond, Wesley; Gorman, Maire N.; Lodi, Lorenzo; McKemmish, Laura K.; Nunn, William; Shah, Rohan; Tennyson, Jonathan

    2018-04-01

    Line lists for the sulphur-containing molecules SH (the mercapto radical) and NS are computed as part of the ExoMol project. These line lists consider transitions within the X 2Π ground state for 32SH, 33SH, 34SH and 32SD, and 14N32S, 14N33S, 14N34S, 14N36S and 15N32S. Ab initio potential energy (PEC) and spin-orbit coupling (SOC) curves are computed and then improved by fitting to experimentally observed transitions. Fully ab initio dipole moment curves (DMCs) computed at high level of theory are used to produce the final line lists. For SH, our fit gives a root-mean-square (rms) error of 0.03 cm-1 between the observed (vmax = 4, Jmax = 34.5) and calculated transitions wavenumbers; this is extrapolated such that all X 2Π rotational-vibrational-electronic (rovibronic) bound states are considered. For 32SH the resulting line list contains about 81 000 transitions and 2 300 rovibronic states, considering levels up to vmax = 14 and Jmax = 60.5. For NS the refinement used a combination of experimentally determined frequencies and energy levels and led to an rms fitting error of 0.002 cm-1. Each NS calculated line list includes around 2.8 million transitions and 31 000 rovibronic states with a vibrational range up to v = 53 and rotational range to J = 235.5, which covers up to 23 000 cm-1. Both line lists should be complete for temperatures up to 5000 K. Example spectra simulated using this line list are shown and comparisons made to the existing data in the CDMS database. The line lists are available from the CDS (http://cdsarc.u-strasbg.fr) and ExoMol (www.exomol.com) data bases.

  10. 50 CFR 23.91 - How do I find out if a species is listed?

    Science.gov (United States)

    2010-10-01

    ... FAUNA AND FLORA (CITES) Lists of Species § 23.91 How do I find out if a species is listed? (a) CITES list. The official CITES list includes species of wildlife and plants placed in Appendix I, II, and III... the CITES Secretariat based on decisions of the Parties. You may access the official list from the...

  11. ASSESSMENT OF PROCUREMENT METHODS USED FOR ...

    African Journals Online (AJOL)

    Osondu

    2012-10-08

    Oct 8, 2012 ... client/or representatives so as to arrive at a tender figure and other ... client have a great influence on maintenance procurement. ... satisfaction and project success and the ... Construction Industries, and Hotels) top the list.

  12. Procurement engineering - the productivity factor

    Energy Technology Data Exchange (ETDEWEB)

    Bargerstock, S.B. (TENERA, L.P., Chattanooga, TN (United States))

    1993-01-01

    The industry is several years on the road to implementation of the Nuclear Management and Resources Council (NUMARC) initiatives on commercial-grade item dedication and procurement. Utilities have taken several approaches to involve engineering in the procurement process. A common result for the approaches is the additional operations and maintenance (O M) cost imposed by the added resource requirements. Procurement engineering productivity is a key element in controlling this business area. Experience shows that 400 to 500% improvements in productivity are possible with a 2-yr period. Improving the productivity of the procurement engineering function is important in today's competitive utility environment. Procurement engineering typically involves four distinct technical evaluation responsibilities along with several administrative areas. Technical evaluations include the functionally based safety classification of replacement components and parts (lacking a master parts list), the determination of dedication requirements for safety-related commercial-grade items, the preparation of a procurement specification to maintain the licensed design bases, and the equivalency evaluation of alternate items not requiring the design-change process. Administrative duties include obtaining technical review of vendor-supplied documentation, identifying obsolete parts and components, resolving material nonconformances, initiating the design-change process for replacement items (as needed), and providing technical support to O M. Although most utilities may not perform or require all the noted activities, a large percentage will apply to each utility station.

  13. Procurement engineering - the productivity factor

    International Nuclear Information System (INIS)

    Bargerstock, S.B.

    1993-01-01

    The industry is several years on the road to implementation of the Nuclear Management and Resources Council (NUMARC) initiatives on commercial-grade item dedication and procurement. Utilities have taken several approaches to involve engineering in the procurement process. A common result for the approaches is the additional operations and maintenance (O ampersand M) cost imposed by the added resource requirements. Procurement engineering productivity is a key element in controlling this business area. Experience shows that 400 to 500% improvements in productivity are possible with a 2-yr period. Improving the productivity of the procurement engineering function is important in today's competitive utility environment. Procurement engineering typically involves four distinct technical evaluation responsibilities along with several administrative areas. Technical evaluations include the functionally based safety classification of replacement components and parts (lacking a master parts list), the determination of dedication requirements for safety-related commercial-grade items, the preparation of a procurement specification to maintain the licensed design bases, and the equivalency evaluation of alternate items not requiring the design-change process. Administrative duties include obtaining technical review of vendor-supplied documentation, identifying obsolete parts and components, resolving material nonconformances, initiating the design-change process for replacement items (as needed), and providing technical support to O ampersand M. Although most utilities may not perform or require all the noted activities, a large percentage will apply to each utility station

  14. 75 FR 77745 - Federal Acquisition Regulation; Technical Amendments

    Science.gov (United States)

    2010-12-13

    ... purposes of updating. List of Subjects in 48 CFR Parts 3, 5, 7, and 10 Government procurement. Dated... [Amended] 0 2. Amend section 3.104-1 by removing from the definition ``Federal agency procurement,'' in the...

  15. 40 CFR Appendix I to Subpart S of... - Vehicle Procurement Methodology

    Science.gov (United States)

    2010-07-01

    ... I to Subpart S of Part 86—Vehicle Procurement Methodology I. Test Sampling: The master owner list... randomized master owner list. The manufacturer or their representative shall perform the following steps: (a... order of their appearance on a randomized master owner list until the required number of vehicles are...

  16. Spitzer deep and wide legacy mid- and far-infrared number counts and lower limits of cosmic infrared background

    Science.gov (United States)

    Béthermin, M.; Dole, H.; Beelen, A.; Aussel, H.

    2010-03-01

    Aims: We aim to place stronger lower limits on the cosmic infrared background (CIB) brightness at 24 μm, 70 μm and 160 μm and measure the extragalactic number counts at these wavelengths in a homogeneous way from various surveys. Methods: Using Spitzer legacy data over 53.6 deg2 of various depths, we build catalogs with the same extraction method at each wavelength. Completeness and photometric accuracy are estimated with Monte-Carlo simulations. Number count uncertainties are estimated with a counts-in-cells moment method to take galaxy clustering into account. Furthermore, we use a stacking analysis to estimate number counts of sources not detected at 70 μm and 160 μm. This method is validated by simulations. The integration of the number counts gives new CIB lower limits. Results: Number counts reach 35 μJy, 3.5 mJy and 40 mJy at 24 μm, 70 μm, and 160 μm, respectively. We reach deeper flux densities of 0.38 mJy at 70, and 3.1 at 160 μm with a stacking analysis. We confirm the number count turnover at 24 μm and 70 μm, and observe it for the first time at 160 μm at about 20 mJy, together with a power-law behavior below 10 mJy. These mid- and far-infrared counts: 1) are homogeneously built by combining fields of different depths and sizes, providing a legacy over about three orders of magnitude in flux density; 2) are the deepest to date at 70 μm and 160 μm; 3) agree with previously published results in the common measured flux density range; 4) globally agree with the Lagache et al. (2004) model, except at 160 μm, where the model slightly overestimates the counts around 20 and 200 mJy. Conclusions: These counts are integrated to estimate new CIB firm lower limits of 2.29-0.09+0.09 nW m-2 sr-1, 5.4-0.4+0.4 nW m-2 sr-1, and 8.9-1.1+1.1 nW m-2 sr-1 at 24 μm, 70 μm, and 160 μm, respectively, and extrapolated to give new estimates of the CIB due to galaxies of 2.86-0.16+0.19 nW m-2 sr-1, 6.6-0.6+0.7 nW m-2 sr-1, and 14.6-2.9+7.1 nW m-2 sr-1

  17. VizieR Online Data Catalog: Orion Integral Filament ALMA+IRAM30m N2H+(1-0) data (Hacar+, 2018)

    Science.gov (United States)

    Hacar, A.; Tafalla, M.; Forbrich, J.; Alves, J.; Meingast, S.; Grossschedl, J.; Teixeira, P. S.

    2018-01-01

    Combined ALMA+IRAM30m large-scale N2H+(1-0) emission in the Orion ISF. Two datasets are presented here in FITS format: 1.- Full data cube: spectral resolution = 0.1 kms-1 2.- Total integrated line intensity (moment 0) map Units are in Jy/beam See also: https://sites.google.com/site/orion4dproject/home (2 data files).

  18. 7 CFR 23.10 - Administration.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Administration. 23.10 Section 23.10 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK Regional Program § 23.10 Administration. (a) The Regional Programs will be administered through four Regional Rural Development Centers...

  19. Percolation Analysis of a Wiener Reconstruction of the IRAS 1.2 Jy Redshift Catalog

    Science.gov (United States)

    Yess, Capp; Shandarin, Sergei F.; Fisher, Karl B.

    1997-01-01

    We present percolation analyses of Wiener reconstructions of the IRAS 1.2 Jy redshift survey. There are 10 reconstructions of galaxy density fields in real space spanning the range β = 0.1-1.0, where β = Ω0.6/b, Ω is the present dimensionless density, and b is the bias factor. Our method uses the growth of the largest cluster statistic to characterize the topology of a density field, where Gaussian randomized versions of the reconstructions are used as standards for analysis. For the reconstruction volume of radius R ~ 100 h-1 Mpc, percolation analysis reveals a slight ``meatball'' topology for the real space, galaxy distribution of the IRAS survey.

  20. 23 CFR 661.57 - How is a list of deficient bridges to be generated?

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false How is a list of deficient bridges to be generated? 661... AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.57 How is a list of deficient bridges to be generated? (a) In consultation with the BIA, a list of deficient BIA IRR bridges will be...

  1. Inefficient procurement processes undermine access to medicines in ...

    African Journals Online (AJOL)

    Inefficient procurement processes undermine access to medicines in the Western ... chronic infectious and non-communicable diseases in the public sector. ... (ii) absence of contracts for certain medicines appearing on provincial code lists; ...

  2. Monitoring what governments "give for" and "spend on" vaccine procurement: Vaccine Procurement Assistance and Vaccine Procurement Baseline.

    Science.gov (United States)

    Nelson, E A S; Bloom, David E; Mahoney, Richard T

    2014-01-01

    The Global Vaccine Action Plan will require, inter alia, the mobilization of financial resources from donors and national governments - both rich and poor. Vaccine Procurement Assistance (VPA) and Vaccine Procurement Baseline (VPB) are two metrics that could measure government performance and track resources in this arena. VPA is proposed as a new subcategory of Official Development Assistance (ODA) given for the procurement of vaccines and VPB is a previously suggested measure of the share of Gross Domestic Product (GDP) that governments spend on their own vaccine procurement. To determine realistic targets for VPA and VPB. Organization for Economic Co-Operation and Development (OECD) and World Bank data for 2009 were analyzed to determine the proportions of bilateral ODA from the 23 Development Assistance Committee (DAC) countries disbursed (as % of GDP in current US$) for infectious disease control. DAC country contributions to the GAVI Alliance for 2009 were assessed as a measure of multilateral donor support for vaccines and immunization programs. In 2009, total DAC bilateral ODA was 0.16% of global GDP and 0.25% of DAC GDP. As a percentage of GDP, Norway (0.013%) and United Kingdom (0.0085%) disbursed the greatest proportion of bilateral ODA for infectious disease control, and Norway (0.024%) and Canada (0.008%) made the greatest contributions to the GAVI Alliance. In 2009 0.02% of DAC GDP was US$7.61 billion and 0.02% of the GDP of the poorest 117 countries was US$2.88 billion. Adopting 0.02% GDP as minimum targets for both VPA and VPB is based on realistic estimates of what both developed and developing countries should spend, and can afford to spend, to jointly ensure procurement of vaccines recommended by national and global bodies. New OECD purpose codes are needed to specifically track ODA disbursed for a) vaccine procurement; and b) immunization programs.

  3. Multi-source self-calibration: Unveiling the microJy population of compact radio sources

    NARCIS (Netherlands)

    Radcliffe, J. F.; Garrett, M. A.; Beswick, R. J.; Muxlow, T. W. B.; Barthel, P. D.; Deller, A. T.; Middelberg, E.

    2016-01-01

    Context. Very long baseline interferometry (VLBI) data are extremely sensitive to the phase stability of the VLBI array. This is especially important when we reach μJy rms sensitivities. Calibration using standard phase-referencing techniques is often used to improve the phase stability of VLBI

  4. Public perspectives on biospecimen procurement: what biorepositories should consider.

    Science.gov (United States)

    L'Heureux, Jamie; Murray, Jeffrey C; Newbury, Elizabeth; Shinkunas, Laura; Simon, Christian M

    2013-06-01

    Human biospecimens are central to biobanking efforts, yet how members of the public think about biobank procurement strategies is not well understood. This study aimed to explore public perspectives toward the procurement of residual clinical material versus "direct" procurement strategies such as the drawing of blood. Members of the public residing in and beyond the biobank catchment area of the University of Iowa Hospitals and Clinics were randomly selected to participate in focus groups and a telephone survey. The majority of survey participants (75%, n=559) found both residual and direct procurement strategies equally workable. Small proportions preferred either residual (15%; n=117) or direct (5%; n=40) procurement. Focus group participants (n=48) could identify benefits to both procurement strategies, but raised concerns about possible donor inconvenience/discomfort and reduced biospecimen accrual in the case of direct procurement. Residual procurement raised concerns about lower-quality samples being procured without full donor awareness. Biobanks should consider that members of the public in their research programs may be willing to make specimen donations regardless of whether a residual or direct procurement strategy is employed. Limiting patient discomfort and inconvenience may make direct procurement strategies more acceptable to some members of the public. Ensuring donor awareness through effective informed consent may allay public concerns about the indirectness of donating clinical biospecimens.

  5. 76 FR 53113 - Guidelines for Designating Biobased Products for Federal Procurement

    Science.gov (United States)

    2011-08-25

    ... Designating Biobased Products for Federal Procurement AGENCY: Office of Procurement and Property Management... that the Department of Agriculture, Office of Procurement and Property Management, is hereby requesting... comments to: Ron Buckhalt, USDA, Office of Procurement and Property Management, Room 361, Reporters...

  6. 78 FR 25337 - Notice With Respect to List of Countries Denying Fair Market Opportunities for Government-Funded...

    Science.gov (United States)

    2013-04-30

    ...: Date of Publication. FOR FURTHER INFORMATION CONTACT: Scott Pietan, International Procurement... OFFICE OF THE UNITED STATES TRADE REPRESENTATIVE Notice With Respect to List of Countries Denying Fair Market Opportunities for Government-Funded Airport Construction Projects AGENCY: Office of the...

  7. ICORG 10-14

    DEFF Research Database (Denmark)

    Reynolds, J V; Preston, S R; O'Neill, B

    2017-01-01

    comprehensive modern staging, compares both these regimens. METHODS: This open label, multicentre, phase III RCT randomises patients (cT2-3, N0-3, M0) in a 1:1 fashion to receive CROSS protocol (Carboplatin and Paclitaxel with concurrent radiotherapy, 41.4Gy/23Fr, over 5 weeks). The power calculation is a 10......% difference in favour of CROSS, powered at 80%, two-sided alpha level of 0.05, requiring 540 patients to be evaluable, 594 to be recruited if a 10% dropout is included (297 in each group). The primary endpoint is overall survival, with a minimum 3-year follow up. Secondary endpoints include: disease free......). TRIAL REGISTRATION: NCT01726452 . Protocol 10-14. Date of registration 06/11/2012....

  8. Monitoring what governments "give for" and "spend on" vaccine procurement: Vaccine Procurement Assistance and Vaccine Procurement Baseline.

    Directory of Open Access Journals (Sweden)

    E A S Nelson

    Full Text Available BACKGROUND: The Global Vaccine Action Plan will require, inter alia, the mobilization of financial resources from donors and national governments - both rich and poor. Vaccine Procurement Assistance (VPA and Vaccine Procurement Baseline (VPB are two metrics that could measure government performance and track resources in this arena. VPA is proposed as a new subcategory of Official Development Assistance (ODA given for the procurement of vaccines and VPB is a previously suggested measure of the share of Gross Domestic Product (GDP that governments spend on their own vaccine procurement. OBJECTIVE: To determine realistic targets for VPA and VPB. METHODS: Organization for Economic Co-Operation and Development (OECD and World Bank data for 2009 were analyzed to determine the proportions of bilateral ODA from the 23 Development Assistance Committee (DAC countries disbursed (as % of GDP in current US$ for infectious disease control. DAC country contributions to the GAVI Alliance for 2009 were assessed as a measure of multilateral donor support for vaccines and immunization programs. FINDINGS: In 2009, total DAC bilateral ODA was 0.16% of global GDP and 0.25% of DAC GDP. As a percentage of GDP, Norway (0.013% and United Kingdom (0.0085% disbursed the greatest proportion of bilateral ODA for infectious disease control, and Norway (0.024% and Canada (0.008% made the greatest contributions to the GAVI Alliance. In 2009 0.02% of DAC GDP was US$7.61 billion and 0.02% of the GDP of the poorest 117 countries was US$2.88 billion. CONCLUSIONS: Adopting 0.02% GDP as minimum targets for both VPA and VPB is based on realistic estimates of what both developed and developing countries should spend, and can afford to spend, to jointly ensure procurement of vaccines recommended by national and global bodies. New OECD purpose codes are needed to specifically track ODA disbursed for a vaccine procurement; and b immunization programs.

  9. 75 FR 3454 - Office of Special Education and Rehabilitative Services; List of Correspondence

    Science.gov (United States)

    2010-01-21

    ... DEPARTMENT OF EDUCATION Office of Special Education and Rehabilitative Services; List of... permissible and when an evaluation for special education and related services is required. Part C--Infants and.... Alexa Posny, Assistant Secretary for Special Education and Rehabilitative Services. [FR Doc. 2010-1082...

  10. Green related practices for construction procurement

    Science.gov (United States)

    Bidin, Z. A.; Bohari, A. A. M.; Rais, S. L. A.; Saferi, M. M.

    2018-04-01

    Environment degradation issue has been a worldwide problem and various efforts have been done to minimise the problem. Construction sectors are pointed as one of the major contributors to its construction activities. Green-oriented procurement [GP] is considered as an environmental strategy to integrate the environmental practices into the construction delivery. Thus, this paper reviews the concept of GP and the practices related to it. The outcome of this research findings provides a basis for understanding the concept of GP and the further development of GP. The listed GP practices identified from this paper can serve as guidelines for industry practitioners to design, implement, and benchmarking the green practices in their procurement delivery.

  11. 50 CFR 23.89 - What are the criteria for listing species in Appendix I or II?

    Science.gov (United States)

    2010-10-01

    ... ENDANGERED SPECIES OF WILD FAUNA AND FLORA (CITES) Lists of Species § 23.89 What are the criteria for listing... CITES Appendices I and II. A species must meet trade and biological criteria listed in the CITES... in Appendix I, such that enforcement officers who encounter specimens of such similar CITES species...

  12. 75 FR 78976 - Procurement List Proposed Addition and Deletions

    Science.gov (United States)

    2010-12-17

    ... NSN: 7510-01-555-6167--Inkjet printer cartridge NPA: Alabama Industries for the Blind, Talladega, AL.../Location: Eyewear Prescription Service, Phoenix Indian Medical Center, 4212 N. 16th Street, Phoenix, AZ. NPA: Winston-Salem Industries for the Blind, Winston-Salem, NC. Contracting Activity: Health and Human...

  13. 23 CFR 661.31 - Do IRRBP projects have to be listed on an approved IRR TIP?

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Do IRRBP projects have to be listed on an approved IRR... ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.31 Do IRRBP projects have to be listed on an approved IRR TIP? Yes. All IRRBP projects must be listed on an approved IRR TIP. The...

  14. 42 CFR 457.940 - Procurement standards.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Procurement standards. 457.940 Section 457.940... Integrity § 457.940 Procurement standards. (a) A State must submit to CMS a written assurance that title XXI... public or private payment rates for comparable services for comparable populations, consistent with...

  15. Cross sections and reaction rates for 23Na(p,n) 23Mg, 27Al(p,n) 27Si, 27Al(α,n) 30P, 29Si(α,n) 32S, and 30Si(α,n) 33S

    International Nuclear Information System (INIS)

    Flynn, D.S.; Sekharan, K.K.; Hiller, B.A.; Laumer, H.; Weil, J.L.; Gabbard, F.

    1978-01-01

    The total neutron production cross sections for the 23 Na(p,n) 23 Mg, 27 Al(p,n) 27 Si, 27 Al(α,n) 30 P, 29 Si(α,n) 32 S, and 30 Si(α,n) 33 S reactions have been measured for bombarding energies from threshold to 6.3 MeV. The neutron detector was a 60-cm diameter sphere of polyethylene with eight 10 BF 3 counters and was insensitive to the angle and energy of the emitted neutrons. Cross sections for inverse reactions have been obtained using the principle of detailed balance. The data have been used to determine parameters for statistical model calculations to facilitate extrapolation of cross sections to higher bombarding energies. These reactions are relevant to problems of nucleosynthesis and stellar evolution and to studies of radiation damage. Nucleosynthesis reaction rates, N/sub A/(sigmav), were determined for the reactions studied and are tabulated for temperatures ranging from 0.4 x 10 9 to 10.0 x 10 9 K

  16. 76 FR 51916 - Procurement of Commodities and Services Financed by USAID

    Science.gov (United States)

    2011-08-19

    ... procurements with donated funds received under USAID's gift authority, Section 635(d), Foreign Assistance Act... AGENCY FOR INTERNATIONAL DEVELOPMENT 22 CFR Part 228 [Aid Reg. 228] RIN 0412-AA70 Procurement of... of 1961, as amended (FAA), be used for procurement in the United States (U.S.), the recipient country...

  17. Monitoring What Governments “Give for” and “Spend on” Vaccine Procurement: Vaccine Procurement Assistance and Vaccine Procurement Baseline

    Science.gov (United States)

    Nelson, E. A. S.; Bloom, David E.; Mahoney, Richard T.

    2014-01-01

    Background The Global Vaccine Action Plan will require, inter alia, the mobilization of financial resources from donors and national governments – both rich and poor. Vaccine Procurement Assistance (VPA) and Vaccine Procurement Baseline (VPB) are two metrics that could measure government performance and track resources in this arena. VPA is proposed as a new subcategory of Official Development Assistance (ODA) given for the procurement of vaccines and VPB is a previously suggested measure of the share of Gross Domestic Product (GDP) that governments spend on their own vaccine procurement. Objective To determine realistic targets for VPA and VPB. Methods Organization for Economic Co-Operation and Development (OECD) and World Bank data for 2009 were analyzed to determine the proportions of bilateral ODA from the 23 Development Assistance Committee (DAC) countries disbursed (as % of GDP in current US$) for infectious disease control. DAC country contributions to the GAVI Alliance for 2009 were assessed as a measure of multilateral donor support for vaccines and immunization programs. Findings In 2009, total DAC bilateral ODA was 0.16% of global GDP and 0.25% of DAC GDP. As a percentage of GDP, Norway (0.013%) and United Kingdom (0.0085%) disbursed the greatest proportion of bilateral ODA for infectious disease control, and Norway (0.024%) and Canada (0.008%) made the greatest contributions to the GAVI Alliance. In 2009 0.02% of DAC GDP was US$7.61 billion and 0.02% of the GDP of the poorest 117 countries was US$2.88 billion. Conclusions Adopting 0.02% GDP as minimum targets for both VPA and VPB is based on realistic estimates of what both developed and developing countries should spend, and can afford to spend, to jointly ensure procurement of vaccines recommended by national and global bodies. New OECD purpose codes are needed to specifically track ODA disbursed for a) vaccine procurement; and b) immunization programs. PMID:24586899

  18. 77 FR 62150 - Approval and Promulgation of Implementation Plans; Kentucky; Approval of Revisions to the...

    Science.gov (United States)

    2012-10-12

    ....34 Standard of 10/23/01 66 FR 53661 05/15/91 Performance for Existing Pneumatic Rubber Tire... Abbreviations and 11/19/02 67 FR 69688 05/15/02 Acronyms. 1.04 Performance Tests... 10/23/01 66 FR 53660 11/19... 10/23/01 66 FR 53660 06/13/79 Requirements. Reg 6--Standards of Performance for Existing Affected...

  19. 49 CFR 10.23 - Accounting of disclosures.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Accounting of disclosures. 10.23 Section 10.23... INDIVIDUALS Maintenance of Records § 10.23 Accounting of disclosures. Each operating administration, the... accurate accounting of: (1) The date, nature, and purpose of each disclosure of a record to any person or...

  20. What Is the Status of Indonesian E-Procurement?

    OpenAIRE

    Achmad Nurmandi

    2013-01-01

    E-procurement is an important intrument to prevent corruption in goods and services procurement budget. Indonesia has been implementing the e-procurement project since 2008 based on Presidential Decree. President has stipulating annual order (presidential instruction) has to be obey by all ministries and local governments to procure their budget through r-procurement mechanism. However, untill 2012 fiscal year, this research found that only around 10.26% of central government institution proc...

  1. 75 FR 71431 - Clean Water Act Section 303(d): Availability of List Decisions Correction

    Science.gov (United States)

    2010-11-23

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9230-1] Clean Water Act Section 303(d): Availability of List... Availability. SUMMARY: This action corrects a Federal Register notice that published on November 9, 2010 at 75 FR 68783 announcing the availability of EPA decisions identifying water quality limited segments and...

  2. public procurement, governance and economic growth

    African Journals Online (AJOL)

    GRACE

    (2003: 2), ―strong procurement management in the public sector is a tool for achieving political, economic and social goals‖. Thus .... professionalism in the public sector procurement system (Section 4, PPA, 2007). The functions and powers of the ..... K., Bose, N. and Haque, M.E. (2004). Public Expenditures, Bureaucratic.

  3. 78 FR 37697 - Federal Acquisition Regulation; Technical Amendments

    Science.gov (United States)

    2013-06-21

    ... changes to the FAR. List of Subject in 48 CFR Parts 8 and 52 Government procurement. Dated: June 13, 2013... SERVICES 0 2. Amend section 8.703 by revising the third sentence to read as follows: 8.703 Procurement list. * * * Questions concerning whether a supply item or service is on the Procurement List may be submitted at...

  4. A review of public policies to procure and distribute kidneys for transplantation.

    Science.gov (United States)

    Singer, P A

    1990-03-01

    The purpose of this article is to provide an up-to-date review of the current status of frequently changing public policies for the procurement and distribution of donor kidneys for transplantation. Issues in procurement involve the Uniform Anatomical Gift Act, criteria for brain death, routine inquiry/required request policies, and the use of living kidney donors. Issues in distribution involve access to the transplant waiting list and use of the new national point system to select recipients from the list. These public policies are relevant for internists, who often care for potential organ donors and patients with end-stage renal disease. The issues are also relevant for policy-minded physicians because renal transplantation is the paradigm for organ transplant policy.

  5. 76 FR 30377 - Endangered and Threatened Wildlife and Plants; 5-Year Reviews of Species in California, Nevada...

    Science.gov (United States)

    2011-05-25

    ..., Santa Cruz Island bush-mallow, Santa Rosa Island manzanita, Smith's blue butterfly, and soft-leaved... Status Where listed Final listing rule ANIMALS Behren's silverspot butterfly... Speyeria zerene.... (CA)....... 58 FR 49887; 09/23/ terminatus 1993 abdominalis. El Segundo blue butterfly...

  6. Nepal : Electronic Government Procurement Readiness Assessment and Roadmap

    OpenAIRE

    World Bank

    2007-01-01

    The assessment focused on the degree of readiness of Government of Nepal's (GoN's) current public procurement environment for making a transition from a traditional paper-based, manual procurement transaction processing and communication to electronic government procurement (e-GP). Some 20 public and private sector organizations, involved in a wide range of functions that relate to public...

  7. 10 CFR Appendix N to Part 110 - Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's...

    Science.gov (United States)

    2010-01-01

    ..., Plants and Equipment Under NRC's Export Licensing Authority N Appendix N to Part 110 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL Pt. 110, App. N Appendix N to Part 110—Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment...

  8. Evaluación por rendimiento de 12 genotipos promisorios de fríjol voluble (Phaseolus vulgaris L. tipo Bola roja y Reventón para las zonas frías de Colombia

    Directory of Open Access Journals (Sweden)

    López Jesús Edgardo

    2006-12-01

    Full Text Available

    10.0pt; font-family: ";Cambria";,";serif";; mso-ascii-theme-font: major-latin; mso-fareast-font-family: Baskerville; mso-hansi-theme-font: major-latin; mso-bidi-font-family: Baskerville;">El fríjol común (10.0pt; font-family: ";Cambria";,";serif";; mso-ascii-theme-font: major-latin; mso-fareast-font-family: Baskerville-Italic; mso-hansi-theme-font: major-latin; mso-bidi-font-family: Baskerville-Italic;">Phaseolus vulgaris 10.0pt; font-family: ";Cambria";,";serif";; mso-ascii-theme-font: major-latin; mso-fareast-font-family: Baskerville; mso-hansi-theme-font: major-latin; mso-bidi-font-family: Baskerville;">L. es un alimento básico en la región Andina por ser una fuente rica en proteína y de bajo costo. La investigación para incrementar rendimientos en esta leguminosa es una opción para mejorar la competitividad en el mercado mundial. El objetivo principal de este trabajo fue evaluar por rendimiento los genotipos promisorios de fríjol voluble, tipos Bola roja y Reventón, para las zonas frías de Colombia mediante el análisis de sendero. Se realizó un diseño de bloques completos al azar con tres réplicas para evaluar 10 genotipos promisorios de fríjol voluble. El análisis de sendero para el rendimiento por planta y las correlaciones entre el rendimiento y sus componentes mostraron que el carácter número de vainas por planta es el de mayor importancia sobre la determinación del rendimiento, en comparación con los caracteres peso de 100 semillas y número de semillas por vaina, tanto en los genotipos de fríjol voluble tipo Bola roja como tipo Reventón

  9. Resource utilization associated with procurement of transplantable organs from donors that do not meet OPTN eligible death criteria.

    Science.gov (United States)

    DuBay, Derek A; Redden, David T; Bryant, Mary K; Dorn, David P; Fouad, Mona N; Gray, Stephen H; White, Jared A; Locke, Jayme E; Meeks, Christopher B; Taylor, Garry C; Kilgore, Meredith L; Eckhoff, Devin E

    2014-05-27

    The strategy of evaluating every donation opportunity warrants an investigation into the financial feasibility of this practice. The purpose of this investigation is to measure resource utilization required for procurement of transplantable organs in an organ procurement organization (OPO). Donors were stratified into those that met OPTN-defined eligible death criteria (ED donors, n=589) and those that did not (NED donors, n=703). Variable direct costs and time utilization by OPO staff for organ procurement were measured and amortized per organ transplanted using permutation methods and statistical bootstrapping/resampling approaches. More organs per donor were procured (3.66±1.2 vs. 2.34±0.8, Pdonors compared with NED donors. The variable direct costs were significantly lower in the NED donors ($29,879.4±11590.1 vs. $19,019.6±7599.60, Porgan transplanted were significantly higher in the NED donors ($8,414.5±138.29 vs. $9,272.04±344.56, Pdonors where thoracic organ procurement occurred were 67% more expensive than in abdominal-only organ procurement. The total time allocated per donor was significantly shorter in the NED donors (91.2±44.9 hr vs. 86.8±78.6 hr, P=0.01). In contrast, the amortized time per organ transplanted was significantly longer in the NED donors (23.1±0.8 hr vs. 36.9±3.2 hr, Porgan transplanted is significantly higher in donors that do not meet the eligible death criteria.

  10. 78 FR 38952 - Procurement List; Proposed Additions to and Deletions

    Science.gov (United States)

    2013-06-28

    ...: This notice is published pursuant to 41 U.S.C. 8503 (a)(2) and 41 CFR 51-2.3. Its purpose is to provide...: 7510-00-NIB-9832--Portable Desktop Clipboard, 10'' W x 2-3/5'' D x 16'' H, Black. NSN: 7510-00-NIB-9833--Portable Desktop Clipboard, 10'' W x 2-3/5'' D x 16'' H, Blue. NSN: 7510-00-NIB-9851--Portable Desktop...

  11. File list: Oth.Unc.10.Adenine_N6-methylation.AllCell [Chip-atlas[Archive

    Lifescience Database Archive (English)

    Full Text Available Oth.Unc.10.Adenine_N6-methylation.AllCell ce10 TFs and others Adenine N6-methylatio...n Unclassified http://dbarchive.biosciencedbc.jp/kyushu-u/ce10/assembled/Oth.Unc.10.Adenine_N6-methylation.AllCell.bed ...

  12. 77 FR 35745 - Highway Safety Programs; Conforming Products List of Screening Devices To Measure Alcohol in...

    Science.gov (United States)

    2012-06-14

    ..., battery powered device with a semiconductor sensor. (2) Alcohol Countermeasure Systems Corp., submitted...-0062] Highway Safety Programs; Conforming Products List of Screening Devices To Measure Alcohol in... Screening Devices to Measure Alcohol in Bodily Fluids dated, March 31, 2008 (73 FR 16956). DATES: Effective...

  13. 75 FR 29719 - Carbazole Violet Pigment 23 From India: Continuation of Countervailing Duty Order

    Science.gov (United States)

    2010-05-27

    ..., paste, wet cake) and finished pigment in the form of presscake and dry color. Pigment dispersions in any... DEPARTMENT OF COMMERCE International Trade Administration [C-533-839] Carbazole Violet Pigment 23... Pigment 23 From India, 69 FR 77995 (December 29, 2004). On November 2, 2009, the Department initiated and...

  14. 75 FR 25174 - Endangered and Threatened Wildlife and Plants; Proposed Listing for the Largetooth Sawfish

    Science.gov (United States)

    2010-05-07

    ...) Policy for Evaluating Conservation Efforts When Making Listing Decisions (PECE policy; 68 FR 15100; March... Costa Rica, 7 from Colombia, 6 from Venezuela, 1 from Guyana, 5 from Suriname, 1 from French Guiana, and... been abundant in some areas of Venezuela (Cervignon, 1966a; 1966b), the last of the four confirmed...

  15. 23 CFR 1200.10 - Application.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Application. 1200.10 Section 1200.10 Highways NATIONAL... PROCEDURES FOR STATE HIGHWAY SAFETY PROGRAMS UNIFORM PROCEDURES FOR STATE HIGHWAY SAFETY PROGRAMS Application, Approval, and Funding of the Highway Safety Program § 1200.10 Application. Each fiscal year, a State's...

  16. 48 CFR 2901.603-72 - Administrative procurement management reviews.

    Science.gov (United States)

    2010-10-01

    ... Authority, and Responsibilities 2901.603-72 Administrative procurement management reviews. (a) The Senior... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Administrative procurement management reviews. 2901.603-72 Section 2901.603-72 Federal Acquisition Regulations System DEPARTMENT OF...

  17. 10 CFR 50.23 - Construction permits.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  18. 78 FR 69703 - 10-Day Notice of Proposed Information Collection: Generic Customer Satisfaction Surveys; Physical...

    Science.gov (United States)

    2013-11-20

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5683-N-102] 10-Day Notice of Proposed Information Collection: Generic Customer Satisfaction Surveys; Physical Inspection Pilot Program...

  19. 10 CFR 850.23 - Action level.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Action level. 850.23 Section 850.23 Energy DEPARTMENT OF ENERGY CHRONIC BERYLLIUM DISEASE PREVENTION PROGRAM Specific Program Requirements § 850.23 Action level. (a) The responsible employer must include in its CBDPP an action level that is no greater than 0.2 µg...

  20. 77 FR 77037 - Procurement List; Additions

    Science.gov (United States)

    2012-12-31

    ... Management Service Center, Springfield, IL. Service Type/Location: Administrative Services, Dept. of Housing and Urban Development (HUD), Multi-locations--Nationwide, 77 West Jackson Blvd. Rm. 2517, Mail Code... Service Type/Location: Custodial Services, Transportation Security Administration (TSA), 6100 E.M. Dirksen...

  1. 75 FR 51444 - Procurement List Additions

    Science.gov (United States)

    2010-08-20

    ... Research, Development, and Engineering Command, Natick, MA. Undershirt, Midweight Cold Weather (Gen III) NSN: 8415-01-546-0124--Size X Small Short. NSN: 8415-01-546-0128--Size X Small Regular. NSN: 8415-01...--Size X Large Regular. NSN: 8415-01-538-8711--Size X Large Long. NSN: 8415-01-546-0362--Size X Large X...

  2. 75 FR 33269 - Procurement List; Additions

    Science.gov (United States)

    2010-06-11

    ... may have ever provided a product or service to the government-- only the current or most recent... and made a best value selection of its subcontractor and is expected to show competition for its subcontractor every five years. The Committee's responsibility under the Javits-Wagner-O'Day Act (41 U.S.C. 46...

  3. 78 FR 4133 - Procurement List; Addition

    Science.gov (United States)

    2013-01-18

    ... and Cook Support, Two Seasons Dining Facility, 447 North Street, Building 2207, Eielson Air Force Base... 354 CONS LGC, Eielson AFB, AK. Comments were received from two associations representing agencies and...

  4. 76 FR 18189 - Procurement List; Additions

    Science.gov (United States)

    2011-04-01

    ...: Professional Contract Services, Inc., Austin, TX. Contracting Activity: Dept of the Army, XR W40M Natl Region Contract OFC, Washington, DC. Service Type/Location: Prime Vendor Support for Foreign Military Sales...

  5. 76 FR 70422 - Procurement List Additions

    Science.gov (United States)

    2011-11-14

    ..., Disinfectant Cleaner-Degreaser Cartridge Concentrate. NSN: 7930-00-NIB-0593--Refills, Multi-Purpose Cleaner, Cartridge Concentrate. NSN: 7930-00-NIB-0594--Starter Kit, Multi-Purpose Cleaner, Cartridge Concentrate. NPA..., Anniston, AL Service Type/Locations: Rubbish Removal and Recycling Service Department of the Treasury...

  6. 77 FR 44218 - Procurement List; Additions

    Science.gov (United States)

    2012-07-27

    ..., Fiberglass Handle NSN: 5120-00-NIB-0014--Shovel, Round Point, Closed Back, Industrial Grade, 48'' Fiberglass Handle, Cushioned Grip NSN: 5120-00-NIB-0015--Shovel, Round Point, Open Back, Industrial Grade, 48'' Fiberglass Handle, Cushioned Grip NSN: 5120-00-NIB-0016--Shovel, Round Point, Open Back, Industrial Grade, 29...

  7. 77 FR 42700 - Procurement List; Additions

    Science.gov (United States)

    2012-07-20

    ... NSN: 5120-00-NIB-0001--Hammer--2 lb, Engineer's, 16'' Fiberglass Handle NSN: 5120-00-NIB-0002--Hammer--3 lb, Engineer's, 16'' Fiberglass Handle NSN: 5120-00-NIB-0003--Hammer--4 lb, Engineer's, 16... AFB, CO NPA: Goodwill Industrial Services Corporation, Colorado Springs, CO Contracting Activity: Dept...

  8. 78 FR 67129 - Procurement List; Additions

    Science.gov (United States)

    2013-11-08

    ...: Products NSN: MR 377--Socks, Holiday. NSN: MR 382--Duct Tape, Holiday Themed, Assorted Colors. NSN: MR 10635--Serving Platter, Heavy Duty, Raised Surface, Fall Themed, White. NPA: Winston-Salem Industries... Requirement as aggregated by the General Services Administration. NSN: 6645-00-NIB-0142--Clock, Wall, Quartz...

  9. 77 FR 65365 - Procurement List; Additions

    Science.gov (United States)

    2012-10-26

    ..., TX Eyewear NSN: 6650-00-NIB-0009--Single Vision, Plastic, Clear NSN: 6650-00-NIB-0010--Flat Top 28... Administration, Department of Veterans Affairs, Pittsburgh PA. NPA: Winston-Salem Industries for the Blind, Inc...

  10. 75 FR 54114 - Procurement List Additions

    Science.gov (United States)

    2010-09-03

    ... the Alan Bible Federal Building and Lloyd George U.S. Courthouse in Las Vegas, NV. In its comments.... Services Service Type/Locations: Janitorial & Grounds Service, Alan Bible Federal Building, 600 Las Vegas...

  11. 76 FR 59116 - Procurement List; Additions

    Science.gov (United States)

    2011-09-23

    ...--Jacket, USAF, 3/4 Length, Unisex, Dark Navy Blue, Numerous Sizes. NSN: AF320--Pants, USAF, Unisex, Rain..., Longevity Stripe, Blue and Gold. NSN: AF9412--Badge, ``Police'', USAF, Nickel Finish, 3''x2 ''. NSN: AF9413G...

  12. 78 FR 7413 - Procurement List; Additions

    Science.gov (United States)

    2013-02-01

    ... ounce plastic container. NSN: 8950-01-E61-0108--Ground red pepper in a 16 ounce plastic container. NSN.../Location: Custodial Service, Social Security Administration (SSA), West High Rise and West Low Rise...

  13. 75 FR 52724 - Procurement List Additions

    Science.gov (United States)

    2010-08-27

    ... Florida, Inc., Miami, FL Contracting Activity: Department of the Army Research, Development, & Engineering... Department of the Army Research, Development, & Engineering Command, Natick, MA. Kit, Pre-Cut Fabric NSN..., Size 19 NSN: 8405-00-FAB-0278--Man's, S/S, Air Force Shade 1550, Size 20 NSN: 8410-00-FAB-8362--Woman's...

  14. 78 FR 65617 - Procurement List; Additions

    Science.gov (United States)

    2013-11-01

    ..., 9th Floor, De Diego Ave. Parada 22, Santurce, PR NPA: The Corporate Source, Inc., New York, NY... Communication & Electrical Room, 500 Airport Blvd., 115, Lake Charles, LA. NPA: Calcasieu Association for...

  15. 78 FR 23543 - Procurement List Deletions

    Science.gov (United States)

    2013-04-19

    ... Logistics Agency Troop Support, Philadelphia, PA NSN: 1680-00-677-2060--Bottom Assembly, Crew Berth NPA: None assigned. Contracting Activity: Defense Logistics Agency Aviation, Richmond, VA Service Service..., Property Management Service Center, Chicago, IL Patricia Briscoe, Deputy Director, Business Operations...

  16. 77 FR 75616 - Procurement List; Additions

    Science.gov (United States)

    2012-12-21

    .... 611, 1919 E Grange Ave., Milwaukee, WI NPA: Easter Seals Southeast Wisconsin, Inc., South Milwaukee... B, Bldg. 39, Wright-Patterson AFB, Dayton, OH NPA: Goodwill Easter Seals Miami Valley, Dayton, OH...

  17. 77 FR 37658 - Procurement List; Additions

    Science.gov (United States)

    2012-06-22

    ..., Warren, MI. Service Type/Location: Mailroom Operations, Official Mail Distribution Center, 1 Rock Island Arsenal, Building 132, Rock Island, IL. NPA: The Arc of the Quad Cities Area, Rock Island, IL. Contracting Activity: Dept of the Army, W4MM USA Joint Munitions CMD, Rock Island, IL. Service Type/Location: Custodial...

  18. 78 FR 25971 - Procurement List, Additions

    Science.gov (United States)

    2013-05-03

    ... Committee for Purchase From People Who Are Blind or Severely Disabled published notices of proposed..., MI, (Off- site: 2307 Business Center Dr, Austin TX) NPA: Travis Association for the Blind, Austin, TX...

  19. 78 FR 9386 - Procurement List; Addition

    Science.gov (United States)

    2013-02-08

    ... Purchase From People Who Are Blind or Severely Disabled published notice of proposed addition to the...: Enterprise Professional Services, Inc., Austin, TX Contracting Activity: Dept of the Army, W40M USA MEDCOM...

  20. 77 FR 55195 - Procurement List; Additions

    Science.gov (United States)

    2012-09-07

    ... Purchase From People Who Are Blind or Severely Disabled published notice of proposed additions to the... Harmon Avenue, Fort Stewart, GA. NPA: Professional Contract Services, Inc., Austin, TX. Contracting...

  1. 76 FR 55882 - Procurement List; Addition

    Science.gov (United States)

    2011-09-09

    ... or severely disabled for not less than 75% of the direct hours required for the production or... contractor that currently provides powder laundry detergent to the Government. The incumbent contractor... detergent containers, as well as packaging the product for sale and delivery. This will maximize employment...

  2. 77 FR 66181 - Procurement List; Additions

    Science.gov (United States)

    2012-11-02

    ... Mile Marker, Winterhaven, CA. NPA: ARC-Imperial Valley, El Centro, CA Contracting Activity: Dept of..., DC Service Type/Location: Hospital Housekeeping, Raymond W. Bliss Army Health Center, 2240 E Winrow...

  3. 75 FR 22679 - List of Countries Requiring Cooperation With an International Boycott

    Science.gov (United States)

    2010-04-29

    ... Department of the Treasury. Dated: April 23, 2010. Manal Corwin, International Tax Counsel (Tax Policy). [FR... International Boycott In accordance with section 999(a)(3) of the Internal Revenue Code of 1986, the Department... in, or cooperation with, an international boycott (within the meaning of section 999(b)(3) of the...

  4. 48 CFR 1323.404-70 - DOC affirmative procurement program.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false DOC affirmative procurement program. 1323.404-70 Section 1323.404-70 Federal Acquisition Regulations System DEPARTMENT OF..., OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Use of Recovered Materials 1323.404-70 DOC affirmative procurement...

  5. 75 FR 33320 - Notice of Issuance of Final Determination Concerning a Lift Unit for an Overhead Patient Lift...

    Science.gov (United States)

    2010-06-11

    ... country of origin of the lift unit which may be offered to the U.S. Government under an undesignated government procurement package.'' Dated: June 7, 2010. Harold M. Singer, Director, Regulations and Disclosure Law Division, Office of International Trade. [FR Doc. 2010-14019 Filed 6-10-10; 8:45 am] BILLING CODE...

  6. Listing of awardee names. Active and inactive awards as of March 28, 1985

    International Nuclear Information System (INIS)

    1985-01-01

    This document is a computerized listing issued quarterly from the Procurement and Assistance Data System (PADS), including an alphabetical listing of all acquisition and financial assistance awards (excluding purchase orders) with the Department of Energy

  7. 76 FR 44564 - Endangered and Threatened Wildlife and Plants; 5-Year Status Reviews of Seven Listed Species

    Science.gov (United States)

    2011-07-26

    .... (32 FR 4001). Snake, copperbelly water....... Nerodia Threatened IN north of January 29, 1997... in the List, and improved analytical methods. For the copperbelly water snake, we specifically... A, Columbia, MO 65203-0007. Indiana bat Mr. Andrew King, (812) 334-4261, extension Bloomington Field...

  8. 78 FR 76700 - Procurement Thresholds for Implementation of the Trade Agreements Act of 1979

    Science.gov (United States)

    2013-12-18

    ... International Procurement Policy, Office of the United States Trade Representative, (202) 395-9646 or scott... the World Trade Organization (WTO) Agreement on Government Procurement, Chapter 15 of the United... OFFICE OF THE UNITED STATES TRADE REPRESENTATIVE Procurement Thresholds for Implementation of the...

  9. Building Procurement

    DEFF Research Database (Denmark)

    Andersson, Niclas

    2007-01-01

    evolves from a simple establishment of a contractual relationship to a central and strategic part of construction. The authors relate to cultural, ethical and social and behavioural sciences as the fundamental basis for analysis and understanding of the complexity and dynamics of the procurement system......‘The procurement of construction work is complex, and a successful outcome frequently elusive’. With this opening phrase of the book, the authors take on the challenging job of explaining the complexity of building procurement. Even though building procurement systems are, and will remain, complex...... despite this excellent book, the knowledge, expertise, well-articulated argument and collection of recent research efforts that are provided by the three authors will help to make project success less elusive. The book constitutes a thorough and comprehensive investigation of building procurement, which...

  10. Procurement Service launches new eLearning module

    CERN Multimedia

    2015-01-01

    The Procurement Service has launched a training module covering “Procurement of supplies at CERN up to 200,000 CHF” in the form of an eLearning, accessible to all users involved in the procurement process. A long version (30 minutes) and a short version (10 minutes) are now available via this link.   The objectives of this eLearning module are as follows: To improve users' knowledge of the Procurement Rules to facilitate the successful completion of a DAI. This will ensure their DAI is processed as quickly as possible; To decrease the number of single tender requests and to avoid non compliant procurement practices such as the fragmentation of requirements into smaller orders. The eLearning module in its short version covers a range of topics, including the role of the technical officer, estimation of order amount (and the subsequent procedure to follow) and preparation and completion of the DAI form. The longer version also includes useful informati...

  11. Die maak van ’n kies-jou-eie-avontuur-boek

    Directory of Open Access Journals (Sweden)

    M. Preller

    2000-04-01

    Full Text Available ’n Kies-jou-eie-avontuur-boek het nie ’n hoofkarakter nie. Jy die leser, is die hoofkarakter in die boek. Die boek is dus in die tweede persoon geskryf. Alles wat gebeur, gebeur met jou. Jy, die leser, word op spesifieke plekke in die boek voor ’n keuse gestel.

  12. Bis(1,10-phenanthroline-κ2N,N′(sulfato-κ2O,O′cobalt(II butane-2,3-diol monosolvate

    Directory of Open Access Journals (Sweden)

    Shi-Juan Wang

    2011-04-01

    Full Text Available In the title compound, [Co(SO4(C12H8N22]·C4H10O2, the Co2+ ion has a distorted octahedral coordination environment composed of four N atoms from two chelating 1,10-phenanthroline ligands and two O atoms from an O,O′-bidentate sulfate anion. The dihedral angle between the two chelating N2C2 groups is 83.48 (1°. The Co2+ ion, the S atom and the mid-point of the central C—C bond of the butane-2,3-diol solvent molecule are situated on twofold rotation axes. The molecules of the complex and the solvent molecules are held together by pairs of symmetry-related O—H...O hydrogen bonds with the uncoordinated O atoms of the sulfate ions as acceptors. The solvent molecule is disordered over two sets of sites with site occupancies of 0.40 and 0.60.

  13. 33 CFR 23.10 - Coast Guard emblem.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Coast Guard emblem. 23.10 Section... DISTINCTIVE MARKINGS FOR COAST GUARD VESSELS AND AIRCRAFT § 23.10 Coast Guard emblem. (a) The distinctive emblem of the Coast Guard shall be as follows: On a disc the shield of the Coat of Arms of the United...

  14. 48 CFR 504.602-71 - Federal Procurement Data System-Public access to data.

    Science.gov (United States)

    2010-10-01

    ... Government procurement to the public. (b) Fee for direct hook-up. To the extent that a member of the public... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Federal Procurement Data... Procurement Data System—Public access to data. (a) The FPDS database. The General Services Administration...

  15. 31 CFR 10.23 - Prompt disposition of pending matters.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Prompt disposition of pending matters. 10.23 Section 10.23 Money and Finance: Treasury Office of the Secretary of the Treasury PRACTICE... Revenue Service § 10.23 Prompt disposition of pending matters. A practitioner may not unreasonably delay...

  16. 27 CFR 10.23 - Gifts or payments to wholesalers.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Gifts or payments to wholesalers. 10.23 Section 10.23 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU, DEPARTMENT OF THE TREASURY LIQUORS COMMERCIAL BRIBERY Commercial Bribery § 10.23 Gifts or...

  17. catena-Poly[[bis(μ3-5-hydroxyisophthalatobis(pyrazino[2,3-f][1,10]phenanthrolinedicadmium] dihydrate

    Directory of Open Access Journals (Sweden)

    Peng-Cheng Zhao

    2012-04-01

    Full Text Available The title coordination polymer, {[Cd2(C8H4O52(C14H8N42]·2H2O}n, has a layered structure. The asymmetric unit contains two CdII ions, two pyrazino[2,3-f][1,10]phenanthroline, two 5-hydroxyisophthalate (hip ligands and two lattice water molecules. Each CdII ion is coordinated by two N atoms from a chelating pyrazino[2,3-f][1,10]phenanthroline and four O atoms from three different hip ligands, resulting in a distorted CdN2O4 octahedral coordination environment. The hip ligand connects adjacent CdII ions, forming forming layers parallel to (010. Intralayer O—H...O hydrogen bonds involving the hydroxy groups and solvent water molecules consolidate the crystal packing.

  18. Organ procurement: Spanish transplant procurement management.

    Science.gov (United States)

    Manyalich, Martí; Mestres, Carlos A; Ballesté, Chloë; Páez, Gloria; Valero, Ricard; Gómez, María Paula

    2011-06-01

    Transplantation is an accepted therapeutic option to save or improve the quality of life when organ failure occurs or tissue replacements are needed. However, the lack of organs is the major limitation. The deceased organ procurement organization and professionals provide the solution to this international problem. In this review, we identify the elements involved in the organ procurement management process to analyze the possibility of implementation of deceased organ procurement for a transplantation program. While the donation rates are subject to several negative factors including religious, economic, cultural, and legal issues, the existence of well-trained professionals may considerably increase them. Professional training in organ donation along with the establishment of a solid organizational system has been identified as the crucial factor in developing efficient organ donation and transplantation programs.

  19. Genome analysis methods: Theobroma cacao [PGDBj Registered plant list, Marker list, QTL list, Plant DB link and Genome analysis methods[Archive

    Lifescience Database Archive (English)

    Full Text Available Theobroma cacao ... 2n=20 ... 2011 Sanger (WGS), Roche/454 , Illumina 26 Gb 326 Mb 16.7x... Newbler 4,792 25,912 EUGene following specific training for T. cacao 28,798 CIRAD; http://cocoagendb.cirad.fr Dec2010 Dec2010 10.1038/ng.736 21186351 ...

  20. Procurement of alcohol and underage drinking among adolescents in Ontario.

    Science.gov (United States)

    Smart, R G; Adlaf, E M; Walsh, G W

    1996-07-01

    The purpose of this article is to examine the procurement of alcohol among underage drinkers. The data are based on a survey of 3,571 students in Ontario schools. Underage drinkers were those younger than 19 years of age. Data were gathered with an anonymous questionnaire administered in classrooms in 1992. The data include descriptive analysis of underage procurement and a cluster analysis of underage drinker types (n = 1,125: 566 female). Most students found alcohol easy to obtain, with the most common access being from parents' supplies or older friends. Four types of underage drinkers were identified: bar drinkers (5%), frequent purchasers (10%), frequent obtainers (3%) and infrequent obtainers (83%). Frequent self purchasers and infrequent secondary purchasers have the highest levels of consumption and problems. However, most underage drinkers report no problems.

  1. 77 FR 15681 - Amendments to the HUD Acquisition Regulation (HUDAR)

    Science.gov (United States)

    2012-03-16

    .... List of Subjects 48 CFR Part 2401 Government procurement, Reporting and recordkeeping requirements. 48 CFR Part 2402 Government procurement. 48 CFR Part 2403 Conflict of interests, Government procurement. 48 CFR Part 2404 Government procurement. 48 CFR Parts 2406-2409 Government procurement. 48 CFR Parts...

  2. How is service procurement different from goods procurement? Exploring ex ante costs and ex post problems in IT procurement

    NARCIS (Netherlands)

    Wynstra, Finn; Rooks, Gerrit; Snijders, Chris

    2018-01-01

    Several studies suggest that, in practice, service procurement is more challenging than goods procurement. The underlying but largely implicit argument is that the procurement process for services involves higher buyer uncertainty and therefore requires extra efforts to mitigate this uncertainty.

  3. Indonesia - Country Procurement Assessment Report : Reforming the Public Procurement System

    OpenAIRE

    World Bank

    2001-01-01

    The main objectives of the Country Procurement Assessment Review (CPAR) are to diagnose the public procurement system in Indonesia, assess actual compliance with the country's procurement laws and regulations on the ground, and identify reforms to improve the existing system in line with internationally accepted principles. Section 1 gives an overview. Section 2 describes Indonesia's exist...

  4. 10 CFR 2.3 - Resolution of conflict.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Resolution of conflict. 2.3 Section 2.3 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS § 2.3 Resolution of conflict. (a) In any conflict between a general rule in subpart C of this part and a special...

  5. 14 CFR 23.605 - Fabrication methods.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fabrication methods. 23.605 Section 23.605... Fabrication methods. (a) The methods of fabrication used must produce consistently sound structures. If a... fabrication method must be substantiated by a test program. [Doc. No. 4080, 29 FR 17955, Dec. 18, 1964; 30 FR...

  6. How new subscribers use cancer-related online mailing lists.

    Science.gov (United States)

    Rimer, Barbara K; Lyons, Elizabeth J; Ribisl, Kurt M; Bowling, J Michael; Golin, Carol E; Forlenza, Michael J; Meier, Andrea

    2005-07-01

    Online cancer-related support is an under-studied resource that may serve an important function in the information seeking, care, and support of cancer patients and their families. With over 9.8 million cancer survivors (defined as anyone living with cancer) in the United States alone and the number growing worldwide, it is important to understand how they seek and use online resources to obtain the information they need, when they need it, and in a form and manner appropriate to them. These are stated cancer communication goals of the US National Cancer Institute. Our purposes are to (1) present background information about online mailing lists and electronic support groups, (2) describe the rationale and methodology for the Health eCommunities (HeC) study, and (3) present preliminary baseline data on new subscribers to cancer-related mailing lists. In particular, we describe subscribers' use of mailing lists, their reasons for using them, and their reactions to participating shortly after joining the lists. From April to August 2004, we invited all new subscribers to 10 Association of Cancer Online Resources mailing lists to complete Web-based surveys. We analyzed baseline data from the respondents to examine their perceptions about cancer-related mailing lists and to describe how cancer patients and survivors used these lists in the period shortly after joining them. Cumulative email invitations were sent to 1368 new mailing list subscribers; 293 Web surveys were completed within the allotted time frame (21.4% response rate). Most respondents were over age 50 (n = 203, 72%), white (n = 286, 98%), college graduates (n = 161, 55%), and had health insurance (n = 283, 97%). About 41% (n = 116) of new subscribers reported spending 1 to 3 hours per day reading and responding to list messages. They used the mailing lists for several reasons. Among the most frequently reported, 62% (n = 179) strongly agreed they used mailing lists to obtain information on how to deal

  7. Evolving Procurement Organizations

    DEFF Research Database (Denmark)

    Bals, Lydia; Laiho, Aki; Laine, Jari

    Procurement has to find further levers and advance its contribution to corporate goals continuously. This places pressure on its organization in order to facilitate its performance. Therefore, Procurement organizations constantly have to evolve in order to match these demands. A conceptual model...... is presented and results of a first case study discussed. The findings highlight the importance of taking a contingency perspective on Procurement organization, understanding the internal and internal contingency factors. From a theoretical perspective, it opens up insights that can be furthermore leveraged...... in future studies in the fields of hybrid procurement organizations, global sourcing organizations as well as international procurement offices (IPOs). From a practical standpoint, an assessment of external and internal contingencies provides the opportunity to consciously match organization to its...

  8. Temperature profiles of different cooling methods in porcine pancreas procurement.

    Science.gov (United States)

    Weegman, Bradley P; Suszynski, Thomas M; Scott, William E; Ferrer Fábrega, Joana; Avgoustiniatos, Efstathios S; Anazawa, Takayuki; O'Brien, Timothy D; Rizzari, Michael D; Karatzas, Theodore; Jie, Tun; Sutherland, David E R; Hering, Bernhard J; Papas, Klearchos K

    2014-01-01

    Porcine islet xenotransplantation is a promising alternative to human islet allotransplantation. Porcine pancreas cooling needs to be optimized to reduce the warm ischemia time (WIT) following donation after cardiac death, which is associated with poorer islet isolation outcomes. This study examines the effect of four different cooling Methods on core porcine pancreas temperature (n = 24) and histopathology (n = 16). All Methods involved surface cooling with crushed ice and chilled irrigation. Method A, which is the standard for porcine pancreas procurement, used only surface cooling. Method B involved an intravascular flush with cold solution through the pancreas arterial system. Method C involved an intraductal infusion with cold solution through the major pancreatic duct, and Method D combined all three cooling Methods. Surface cooling alone (Method A) gradually decreased core pancreas temperature to <10 °C after 30 min. Using an intravascular flush (Method B) improved cooling during the entire duration of procurement, but incorporating an intraductal infusion (Method C) rapidly reduced core temperature 15-20 °C within the first 2 min of cooling. Combining all methods (Method D) was the most effective at rapidly reducing temperature and providing sustained cooling throughout the duration of procurement, although the recorded WIT was not different between Methods (P = 0.36). Histological scores were different between the cooling Methods (P = 0.02) and the worst with Method A. There were differences in histological scores between Methods A and C (P = 0.02) and Methods A and D (P = 0.02), but not between Methods C and D (P = 0.95), which may highlight the importance of early cooling using an intraductal infusion. In conclusion, surface cooling alone cannot rapidly cool large (porcine or human) pancreata. Additional cooling with an intravascular flush and intraductal infusion results in improved core porcine pancreas temperature profiles during procurement and

  9. ExoMol line list - XXI. Nitric Oxide (NO)

    Science.gov (United States)

    Wong, Andy; Yurchenko, Sergei N.; Bernath, Peter; Müller, Holger S. P.; McConkey, Stephanie; Tennyson, Jonathan

    2017-09-01

    Line lists for the X 2Π electronic ground state for the parent isotopologue of nitric oxide (14N16O) and five other major isotopologues (14N17O, 14N18O, 15N16O, 15N17O and 15N18O) are presented. The line lists are constructed using empirical energy levels (and line positions) and high-level ab initio intensities. The energy levels were obtained using a combination of two approaches, from an effective Hamiltonian and from solving the rovibronic Schrödinger equation variationally. The effective Hamiltonian model was obtained through a fit to the experimental line positions of NO available in the literature for all six isotopologues using the programs spfit and spcat. The variational model was built through a least squares fit of the ab initio potential and spin-orbit curves to the experimentally derived energies and experimental line positions of the main isotopologue only using the duo program. The ab initio potential energy, spin-orbit and dipole moment curves (PEC, SOC and DMC) are computed using high-level ab initio methods and the marvel method is used to obtain energies of NO from experimental transition frequencies. The line lists are constructed for each isotopologue based on the use of the most accurate energy levels and the ab initio DMC. Each line list covers a wavenumber range from 0 to 40 000 cm-1 with approximately 22 000 rovibronic states and 2.3-2.6 million transitions extending to Jmax = 184.5 and vmax = 51. Partition functions are also calculated up to a temperature of 5000 K. The calculated absorption line intensities at 296 K using these line lists show excellent agreement with those included in the HITRAN and HITEMP data bases. The computed NO line lists are the most comprehensive to date, covering a wider wavenumber and temperature range compared to both the HITRAN and HITEMP data bases. These line lists are also more accurate than those used in HITEMP. The full line lists are available from the CDS http://cdsarc.u-strasbg.fr and ExoMol www

  10. IEA Task 24 Solar procurement 2000

    International Nuclear Information System (INIS)

    Ellehauge, K.; Oestergaard, I.; Gramkow, L.

    2002-04-01

    The objective of the project is to develop and improve large procurements of solar heating systems in order to be able to place large orders with manufacturers and suppliers. The project work will be carried out as an international co-operation under IEA Task 24 with the title 'Solar Procurement'. By co-ordinating the effort between the 4-6 participating countries, the objective is to purchase at least 10,000 solar heating systems, of this amount 1,000-2,000 in Denmark. Such large orders make it possible for manufacturers and suppliers to deliver systems considerably cheaper, and it will be possible to develop systems for given specifications on output and efficiency. These co-ordinated large orders are expected to improve the price/efficiency conditions by up to 50%. The so called 'procurement process' (co-ordinated international procurement based on goal-oriented system development in co-operation between customers and suppliers/manufacturers) will in the project be followed up by information/marketing, education, financing schemes, service schemes, quality assurance and technical support. The project is divided into two main areas (IEA subtasks). 1: 'Procurement and Marketing' and 2: 'Creation of Tools'. Denmark has been requested to be the project manager of subtask 2, 'Creation of Tools'. (EHS)

  11. E-procurement in the Brazilian healthcare system: the impact of joint drug purchases by a hospital network Proceso de compras en línea en el sistema de salud brasileño: impacto de la adquisición conjunta de medicamentos por una red hospitalaria

    Directory of Open Access Journals (Sweden)

    Fernando Sigulem

    2009-11-01

    Full Text Available OBJECTIVE: To evaluate the use of e-procurement to obtain supplies for a network of seven university hospitals with a joint purchase system. METHODS: The study was carried out between October 2003 and October 2005. We analyzed nine joint purchases of 37 pharmaceutical items. All the items were purchased in at least two-thirds of the nine occasions and/or were among the 10 items with the highest expenditure. The following aspects were recorded: price, number of suppliers providing quotes, type of supplier (distributor or manufacturer, reference value (lowest price paid per item by each hospital prior to the establishment of the joint purchase system, unit price for first purchase, and unit price for last purchase. The percent variation in price was compared in relation to the reference value, first and last purchases, and average unit price for the nine purchases. RESULTS: A decrease in price > 10% was observed in 47% of the medications analyzed. A decrease > 20% was recorded in 32% of the 37 items. Five items (midazolam 5 mg 3 mL, tramadol 100 mg 2 mL, vancocin 500 mg vial, ceftazidime 1 g vial and cefepime 1 g vial had a decrease > 50% in unit cost in the first purchase compared to the last purchase value. The unit price for 26 items (70% had an average reduction of 23%. CONCLUSIONS: E-procurement was successful in achieving real savings. The results show that the incorporation of new management technologies such as e-procurement in the healthcare setting may help overcome the management gap in the healthcare sector.OBJETIVO: Evaluar la utilización de un proceso de compras en línea para obtener suministros para una red de siete hospitales universitarios con un sistema conjunto de adquisición. MÉTODOS: Este estudio se realizó entre octubre de 2003 y octubre de 2005. Se analizaron nueve adquisiciones conjuntas de 37 productos farmacéuticos. Todos los productos se adquirieron al menos en seis de las nueve ocasiones o estaban entre los 10

  12. The transformation of the tender evaluation process in public procurement in Poland

    Science.gov (United States)

    Plebankiewicz, E.; Kozik, R.

    2017-10-01

    Procedures regarding the evaluation of tenders have been changed since the public procurement law was enacted (it came into force in January 1, 1995). The contracting authority could apply both the criteria related to the qualities of the contractor and those related to the to the subject - matter of public contract. Two extensive amendments in 2001 and a government project introduced vital regulations and excluded the possibility of applying criteria related to the qualities of the contractor. Act of 29 January 2004 Public Procurement Law allowed to use price as the sole contract award criterion. The changes in the Law in 2014 restricted that possibility to the situation in which the subject matter of a contract is commonly available and has established quality standards. The Act of 22 June 2016 amending the Public Procurement Law Act and some other laws introduced the new criteria list and limited the importance of the price criterion in the certain situations. Instead of price, the cost can also be a criterion for tender evaluation. The cost criterion can be determined using life cycle costing. In the paper, based on contract notices of open tendering published in the Public Procurement Bulletin, the criteria of construction contract selection will be analysed. In particular the effectiveness of changes in the Procurement Law will be researched.

  13. Infrastructure procurement skills gap amongst procurement personnel in Nigeria’s public sector

    OpenAIRE

    Mahamadu, A.-M. ed; Manu, P.; Booth, C.; Olomolaiye, P.; Coker, A.; Ibrahim, A. ed; Lamond, J.

    2018-01-01

    Purpose - Procurement of public infrastructure that is fit for purpose partly depends on the competencies of procurement personnel. In many developing countries in Sub-Saharan Africa, including Nigeria, there is a deficit in the quantity and quality of infrastructure and their procurement is further riddled with deficiencies in the capacity of public procuring entities. It is, however, unclear from the extant literature, what are the critical skills development needs of public personnel invol...

  14. 75 FR 12497 - Carbazole Violet Pigment 23 from India and the People's Republic of China: Final Results of the...

    Science.gov (United States)

    2010-03-16

    ... Pigment 23 from India and the People's Republic of China: Final Results of the Expedited Sunset Reviews of... antidumping duty orders on carbazole violet pigment 23 (CVP 23) from India and the People's Republic of China... Five-Year (``Sunset'') Review, 74 FR 56593 (November 2, 2009) (Notice of Initiation). The Department...

  15. Programming list processes. SLIP: symmetric list processor - applications

    International Nuclear Information System (INIS)

    Broudin, Y.

    1966-06-01

    Modern aspects of programming languages are essentially turned towards list processing. The ordinary methods of sequential treatment become inadequate and we must substitute list processes for them, where the cells of a group have no neighbourhood connection, but where the address of one cell is contained in the preceding one. These methods are required in 'time sharing' solving problems. They also allow us to treat new problems and to solve others in the shortest time. Many examples are presented after an abstract of the most usual list languages and a detailed study of one of them : SLIP. Among these examples one should note: locating of words in a dictionary or in a card index, treatment of non numerical symbols, formal derivation. The problems are treated in Fortran II on an IBM 7094 machine. The subroutines which make up the language are presented in an appendix. (author) [fr

  16. The logistics management and coordination in procurement phase of organ transplantation.

    Science.gov (United States)

    Genç, Ruhet

    2008-12-01

    The number of organ transplantation surgeries has increased particularly in the last decade due to technological and scientific advances in medicine. Despite this increase, many patients, however, remain in waiting lists for transplantation surgery. Main reasons for these waiting lists are that there are limited number of organ donations and specifically problems in the management of organ transplantation activities. An efficient management of the allocation and transportation of organs (in other words, logistics management of organ transplantation) are thus extremely important. The aim of the paper is to review current practices of logistics management in the procurement phase of organ transplantation. It initially reviews the organizational structures of the international and national coordination centres, which are founded to coordinate organ transplantation activities and to enhance collaboration among physicians and medical staff. The paper, then, focuses on the possible managerial problems encountered during the procurement phase of organ transplantation. With this respect, common transportation difficulties from global and local perspective are also analyzed. This paper tries to take attention to a systematic regard of the organ transplantation from logistics point of view, thus providing applicable solutions to managerial problems in terms of allocation and transportation of organs.

  17. 78 FR 58507 - Endangered and Threatened Wildlife and Plants; 90-Day Finding on a Petition To List 10 Sturgeon...

    Science.gov (United States)

    2013-09-24

    ...-0051, Division of Policy and Directives Management; U.S. Fish and Wildlife Service; 4401 N. Fairfax... you may make an appointment during normal business hours at the U.S. Fish and Wildlife Service... were listed based upon the similarity of appearance provision. CITES is a multinational agreement...

  18. How does procurement capability maturity affect e-Procurement adoption and leverage purchasing in supply chain

    Directory of Open Access Journals (Sweden)

    Pongpanga Pongsuwan

    2016-11-01

    Full Text Available This study refers to the research model of Batenburg (2008 which defined procurement functions to six maturity dimensions; strategy, processes, control, organization, information, e-Technology as the starting point and indicates twenty two items to support capability maturity measurement which is called “Procurement Competitive Capability Maturity”(PCCM. This model is used for a company to assess current practices of procurement function and perceives the level of its capabilities. The data collection is from a survey of fifty-two selected procurement organizations in Southeast Asia (SEA countries; from Thailand, Vietnam, Philippines, Indonesia, Malaysia and Singapore. The objective of this study is to demonstrate the significant value of industry type, size of spending and centralized/decentralized procurement that affect procurement capability maturity. The results show that the industry has no relation to the capability maturity; the size of procurement spend has a positive relation to the capability maturity; and the centralized procurement has higher capability maturity than the decentralized. Moreover, this study extends the knowledge of e-Procurement and digital context to leverage procurement processes and visible procurement integration in an organization and across the supply chain.

  19. IEA Task 24 Solar procurement 2000

    Energy Technology Data Exchange (ETDEWEB)

    Ellehauge, K.; Oestergaard, I. [Teknologisk Institut, Taastrup. SolEnergiCentret (Denmark); Gramkow, L. [Esbensen, Copenhagen (Denmark)

    2002-04-01

    The objective of the project is to develop and improve large procurements of solar heating systems in order to be able to place large orders with manufacturers and suppliers. The project work will be carried out as an international co-operation under IEA Task 24 with the title 'Solar Procurement'. By co-ordinating the effort between the 4-6 participating countries, the objective is to purchase at least 10,000 solar heating systems, of this amount 1,000-2,000 in Denmark. Such large orders make it possible for manufacturers and suppliers to deliver systems considerably cheaper, and it will be possible to develop systems for given specifications on output and efficiency. These co-ordinated large orders are expected to improve the price/efficiency conditions by up to 50%. The so called 'procurement process' (co-ordinated international procurement based on goal-oriented system development in co-operation between customers and suppliers/manufacturers) will in the project be followed up by information/marketing, education, financing schemes, service schemes, quality assurance and technical support. The project is divided into two main areas (IEA subtasks). 1: 'Procurement and Marketing' and 2: 'Creation of Tools'. Denmark has been requested to be the project manager of subtask 2, 'Creation of Tools'. (EHS)

  20. 77 FR 780 - Procurement List Proposed Additions

    Science.gov (United States)

    2012-01-06

    ... will perform management, supervision, cooking, food preparation, and baking in the two facilities. At... food containers and inserts * * *, full vegetable preparation; prepare, maintain, and clean dining... facilities. These Government personnel are expected to be the food service personnel assigned to military...

  1. 78 FR 23542 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-04-19

    ... notice is published pursuant to 41 U.S.C. 8503 (a)(2) and 41 CFR 51-2.3. Its purpose is to provide..., Paper, Desktop, 3-Hole, Adjustable, 11 sheet capacity, Metallic Base, Black Grip. NSN: 7520-00-NSH-0199...

  2. 76 FR 32146 - Procurement List; Proposed Additions

    Science.gov (United States)

    2011-06-03

    ... . SUPPLEMENTARY INFORMATION: This notice is published pursuant to 41 U.S.C. 47(a)(2) and 41 CFR 51-2.3. Its... Combination Lock. NSN: 5340-00-NIB-0099--Desktop & Peripherals Locking Kit, Standard. NPA: Alphapointe...

  3. 75 FR 4783 - Procurement List; Proposed Additions

    Science.gov (United States)

    2010-01-29

    ..., Winston-Salem, NC. LC Industries, 4500 Emperor Blvd., Durham, NC. Lions Services, Inc., 4600 North Tryon... for the Blind, 6918 Murray Street, Little Rock, AR. NPAs: National Industries for the Blind... Arkansas Lighthouse for the Blind, Little Rock, AR. Contracting Activity: Department of Homeland Security...

  4. 76 FR 38641 - Procurement List; Proposed Additions

    Science.gov (United States)

    2011-07-01

    ... Industries for the Visually Impaired, Somerset, NJ. Contracting Activity: Dept of Agric/Agricultural... Agriculture, as aggregated by the Department of Agriculture, Agricultural Marketing Service, Washington, DC..., Navfac Engineering Command Hawaii, Pearl Harbor, HI. Service Type/Location: Custodial Service, Puget...

  5. 76 FR 59117 - Procurement List; Proposed Additions

    Science.gov (United States)

    2011-09-23

    ... nonprofit agencies employing persons who are blind or have other severe disabilities. Regulatory Flexibility...: Organizational Clothing and Individual Equipment (OCIE), Refurbishment and Warehousing, OCIE West Region. Note... Contracting Command--Warren, Warren, MI. Service Types/Locations: Organizational Clothing and Individual...

  6. 77 FR 27737 - Procurement List Proposed Additions

    Science.gov (United States)

    2012-05-11

    ... Creek, Ft Story East Campus, Light House Cafe, Building 864, 864 Hospital Road, Virginia Beach, VA. NPA...; provide equipment cleaning service, perform facility maintenance and sanitation; provide trash and garbage...

  7. 75 FR 58367 - Procurement List; Proposed Additions

    Science.gov (United States)

    2010-09-24

    ...: Services Service Type/Location: Custodial Service, USARC Young Hall, 120 Mini Drive, Vallejo, CA. NPA: Solano Diversified Services, Vallejo, CA. Contracting Activity: Dept of the Army, XR W6BB ACA Presidio of...

  8. 75 FR 55309 - Procurement List Proposed Additions

    Science.gov (United States)

    2010-09-10

    ... . SUPPLEMENTARY INFORMATION: This notice is published pursuant to 41 U.S.C 47(a)(2) and 41 CFR 51-2.3. Its purpose..., Anchorage, AK. NPA: MQC Enterprises, Inc., Anchorage, AK. Contracting Activity: Dept of Transportation...

  9. 76 FR 34064 - Procurement List; Proposed Additions

    Science.gov (United States)

    2011-06-10

    ... Administration. NPA: Alphapointe Association for the Blind, Kansas City, MO. Contracting Activity: General...--Kit, Remote Feeding and Cleaning. NPA: NewView Oklahoma, Inc., Oklahoma City, OK. Contracting Activity..., PA. NSN: 8465-01-580-1666-MOLLE Component, Load Lifter Attachment Strap, OCP NPA: The Arkansas...

  10. 77 FR 32591 - Procurement List; Proposed Additions

    Science.gov (United States)

    2012-06-01

    ... NSN: 5120-00-NIB-0014--Shovel, Round Point, Closed Back, Industrial Grade, 48'' Fiberglass Handle, Cushioned Grip NSN: 5120-00-NIB-0015--Shovel, Round Point, Open Back, Industrial Grade, 48'' Fiberglass Handle, Cushioned Grip NSN: 5120-00-NIB-0016--Shovel, Round Point, Open Back, Industrial Grade, 29...

  11. 77 FR 59596 - Procurement List; Proposed Additions

    Science.gov (United States)

    2012-09-28

    ... NSN: CBFF0051--Tie Clip, Navy Fire Fighters, Metal NSN: CBFF0053--Nameplate, Navy Fire Fighters, 2 Line, Metal NSN: CBFF0054--Collar, Brass, Navy Fire Fighters, Metal NSN: CBFF0055--Shorts, Navy Fire..., Navy Fire Fighters, Unisex, Short Sleeve Polo, Small thru XXX-Large NSN: CBFF0002--Shirt, Navy Fire...

  12. 77 FR 34026 - Procurement List; Proposed Additions

    Science.gov (United States)

    2012-06-08

    ... provide interested persons an opportunity to submit comments on the proposed actions. Additions If the..., Department of Homeland Security (DHS), Immigration and Customs Enforcement (ICE), Office of Chief Counsel... Institute, Inc., San Antonio, TX. Contracting Activity: Department of Homeland Security, U.S. Immigration...

  13. 78 FR 46927 - Procurement List; Proposed Deletions

    Science.gov (United States)

    2013-08-02

    ...: 7520-01-453-1968--4 PC STAMPS KIT, ``ACCOUNTANT SET'' NSN: 7520-01-453-1969--4 PC STAMPS KIT, ``MAIL... COORDINATOR, WASHINGTON, DC Service Type/Location: Microfilming Tax Forms Service, Internal Revenue Service...

  14. 77 FR 68737 - Procurement List, Proposed Deletions

    Science.gov (United States)

    2012-11-16

    ...: Janitorial/Custodial, Defense Logistics Agency: Point Pleasant Depot, Defense National Stockpile Zone, 2601.... Contracting Activity: Defense Logistics Agency Support Services-- DSS, Fort Belvoir, VA. Service Type/Location.... Contracting Activity: Defense Commissary Agency (DECA), Fort Lee, VA. Barry S. Lineback, Director, Business...

  15. 77 FR 23665 - Procurement List Proposed Additions

    Science.gov (United States)

    2012-04-20

    ...: Services Service Type/Location: Mailroom Operations, Official Mail Distribution Center, 1 Rock Island Arsenal, Building 132, Rock Island, IL. NPA: The Arc of the Quad Cities Area, Rock Island, IL. Contracting Activity: Dept of the ARMY, W4MM USA Joint Munitions CMD, Rock Island, IL. Service Type/Location: Custodial...

  16. 76 FR 29210 - Procurement List; Proposed Additions

    Science.gov (United States)

    2011-05-20

    ... Maintenance Services, NOAA- Atlantic Oceanographic & Meteorological Laboratory (AOML), 4301 Rickenbacker... General Services Administration. Services Service Type/Location: Total Facility Maintenance, FCC--Equipment Developmental Group, 3600 Hiram-Lithia Springs Road, SW., Hiram, GA. NPA: Bobby Dodd Institute...

  17. 77 FR 71400 - Procurement List Proposed Additions

    Science.gov (United States)

    2012-11-30

    ....gov . SUPPLEMENTARY INFORMATION: This notice is published pursuant to 41 U.S.C. 8503(a)(2) and 41 CFR... Services, Inc., Austin, TX. Contracting Activity: W40M USA MEDCOM Health Care Acquisition Agency, Center...

  18. 77 FR 49784 - Procurement List; Proposed Additions

    Science.gov (United States)

    2012-08-17

    ... INFORMATION: This notice is published pursuant to 41 U.S.C. 8503(a)(2) and 41 CFR 51-2.3. Its purpose is to... Grounds Maintenance Services, Austin Courthouse, 501 West 5th Street, Austin, TX NPA: Crossroads...

  19. 77 FR 56813 - Procurement List, Proposed Additions

    Science.gov (United States)

    2012-09-14

    ....gov . SUPPLEMENTARY INFORMATION: This notice is published pursuant to 41 U.S.C. 8503(a)(2) and 41 CFR.... NPA: Enterprise Professional Services, Inc., Austin, TX. Contracting Activity: Dept of Homeland... Huachuca, AZ. NPA: Enterprise Professional Services, Inc., Austin, TX. Contracting Activity: Dept of the...

  20. 76 FR 55883 - Procurement List; Proposed Addition

    Science.gov (United States)

    2011-09-09

    ... INFORMATION: This notice is published pursuant to 41 U.S.C 47(a)(2) and 41 CFR 51-2.3. Its purpose is to... Break Caf[eacute], 3651 S. IH-35, Austin, TX. Connection Warehouse, 2021 East Woodward, Austin, TX. Southpark G (CSB), 1821 Directors Blvd., Austin, TX. Southpark J, 2191 Woodward, Austin, TX. Southpark K...

  1. 77 FR 22289 - Procurement List Proposed Additions

    Science.gov (United States)

    2012-04-13

    ... Commissary Agency. Services Service Type/Location: Janitorial Services, Engineering Research & Development Center, Construction Engineering Research Lab (ERDC-CERL), 2902 Newmark Drive, Champaign, IL. AT&T...-McChord, WA. Stryker National Logistics Center, Building 2701 C Street SW., Auburn, WA. NPA: Skookum...

  2. 77 FR 53179 - Procurement List; Proposed Additions

    Science.gov (United States)

    2012-08-31

    ... Marker, Winterhaven, CA. NPA: ARC-Imperial Valley, El Centro, CA. Contracting Activity: Dept of Homeland Security, U.S. Customs and Border Protection, Border Enforcement Contracting Division, Washington, DC...

  3. 75 FR 69639 - Procurement List; Proposed Addition

    Science.gov (United States)

    2010-11-15

    ... Graeber Street, March ARB, CA. NPA: ARC Riverside, Riverside, CA Contracting Activity: DEPT OF HOMELAND SECURITY, BUREAU OF CUSTOMS AND BORDER PROTECTION, WASHINGTON, DC. Barry S. Lineback, Director, Business...

  4. Recapitulative list of the C.E.A. reports published by the French Atomic Energy Commission (n.757-1062, december 1957-december 1958) supplement to C.E.A. reports n. 593 and 756

    International Nuclear Information System (INIS)

    Schmiterlow, C.G.; Cohen, Y.

    1958-01-01

    Recapitulative list of the C.E.A. reports published by the French Atomic Energy Commission. (number 757-1062, december 1957 - december 1958). Supplement to C.E.A. reports number 593 and 756. (author) [fr

  5. Changes in the organ procurement system in South Korea: effects on brain-dead donor numbers.

    Science.gov (United States)

    Lee, S D; Kim, J H

    2009-11-01

    In Korea, the Organ Transplantation Act came into effect in 2000, establishing the Korean Network for Organ Sharing (KONOS) with centralized authority for organ procurement as well as for approval of donors and recipients to ensure fair organ allocation. However, the number of brain-dead donors decreased sharply, and the organ allocation system proved inefficient. The government revised the Organ Transplantation Act in August 2002, introducing an incentive system. If a transplantation hospital formed a Committee for Brain Death Evaluation and a Hospital Organ Procurement Organization, it could receive a kidney from a brain dead-donor as an incentive to foster organ procurement regardless of the KONOS wait list. The government also launched a pilot brain-dead donor registry program to strengthen Hospital Organ Procurement Organization activity. If local hospitals collaborated with specialized hospitals in organ procurement, local hospitals obtained financial incentives. But because the organ shortage problem has not been resolved, the government has proposed four initiatives: first, broadening the incentive system, which makes it possible to give each specialized hospital a choice of one of eight organs from each donor as an incentive; second, development of an Independent Organ Procurement Organization; third introduction of an opt-out system; and last, improvement of the Committee for Brain Death Evaluation system. It is uncertain which initiatives will be adopted, but changes in organ procurement systems are nonetheless considered a key to solve the organ shortage problem in Korea.

  6. Fighting corruption in tactical procurement

    NARCIS (Netherlands)

    Obanda Wanyama, Peter

    2010-01-01

    Vast amount of public resources are spent on procurement. Effective public procurement yields additional budget space, hence it ought to be conducted with due diligence. However, public procurement most especially tactical procurement in local governments in Uganda is vulnerable to corruption. In

  7. Public Procurement of Innovation Policy

    DEFF Research Database (Denmark)

    Rolfstam, Max; Petersen, Ole Helby

    2014-01-01

    Until recently, Danish policy interest in public procurement has mainly been driven by efficiency and cost-effectiveness concerns. Public-procurement policies have in general focused on the utilisation of economies of scale as a Means of achieving lower prices on goods and services. Attempts...... to develop mandatory procurement systems have also been gradually developing, while the focus on innovation has been relatively modest in Danish procurement policies until recently. This picture is currently changing, as several initiatives emphasising public procurement as a means of stimulating innovation...... have been launched. Whether this gradual change of focus in Danish procurement policies will make a deep and lasting impact on the role of public procurement as a driver for innovationis, however, yet an open question....

  8. 76 FR 14572 - Federal Acquisition Regulation; Technical Amendments

    Science.gov (United States)

    2011-03-16

    ... Acquisition Regulations. List of Subjects in 48 CFR Parts 18, 19, and 52 Government procurement. Dated: March... in paragraph (b) by removing ``http:// www.whitehouse.gov/omb/procurement/guides/emergency_acquisitions_ guide.pdf'' and adding ``http://www.whitehouse.gov/sites/default/files/ omb/assets/procurement...

  9. Services procurement under the WTO’s agreement on government procurement: whither market access?

    OpenAIRE

    Shingal, Anirudh

    2010-01-01

    This paper studies the government procurement of services from foreign suppliers by conducting a statistical analysis of data submitted by Japan and Switzerland to the WTO's Committee on Government Procurement. Using several metrics, the paper examines if the WTO’s Agreement on Government Procurement (GPA) has led to greater market access for foreign suppliers in services procurement. Our results indicate that despite the GPA, the proportions of services contracts awarded to foreigners have d...

  10. 76 FR 65653 - New Source Performance Standards (NSPS) Review

    Science.gov (United States)

    2011-10-24

    ... current within their review cycle, there are also multiple standards in different phases of the review... Rock Plants NN 04/16/1982 (47FR16589) 10/17/2000 3 4 (65FR61760) Polymeric Coating of Supporting VVV 09... whether review of a particular NSPS is necessary during the review cycle. A listing of any NSPS for which...

  11. Topical legal aspects of corruption counteraction in public procurement

    Directory of Open Access Journals (Sweden)

    Aleksandr Igorevich Zemlin

    2015-03-01

    Full Text Available Objective to analyze the current developments in the Russian legislation on corruption counteraction and the legislation on public procurement system on this basis to study legal conflicts and gaps and to develop proposals under the provisions of the National AntiCorruption Plan for 2014ndash2015. Methods historical formallegal logical and systemicfunctional structural and contextual approach to the study of law and theoretical propositions concerning the definition nature and characteristics of legal relations arising in the process of and relating to the corruption counteraction in the public procurement system. Results аn aggregate of theoretical conclusions and proposals aimed at perfection of anticorruption legislation and legislation on the contractual public procurement system is presented. Scientific novelty the results of the author39s interpretation of changes in the Russian anticorruption legislation and legislation on the contractual public procurement system existing legal conflicts and gaps. Practical significance developing proposals for improving the standards of anticorruption legislation and legislation on public procurement system under the provisions of the National AntiCorruption Plan for 2014ndash2015. nbsp

  12. Fighting corruption in tactical procurement

    OpenAIRE

    Obanda Wanyama, Peter

    2010-01-01

    Vast amount of public resources are spent on procurement. Effective public procurement yields additional budget space, hence it ought to be conducted with due diligence. However, public procurement most especially tactical procurement in local governments in Uganda is vulnerable to corruption. In this thesis we analyze how tactical procurement can be managed to fight corruption and promote integrity in the decentralized context in local governments in Uganda. Specifically, we identify the mos...

  13. 10 CFR 851.23 - Safety and health standards.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Safety and health standards. 851.23 Section 851.23 Energy DEPARTMENT OF ENERGY WORKER SAFETY AND HEALTH PROGRAM Specific Program Requirements § 851.23 Safety and..., “Marine Terminals.” (6) Title 29 CFR, Part 1918, “Safety and Health Regulations for Longshoring.” (7...

  14. Public procurement process

    African Journals Online (AJOL)

    NESG Policy Brief: April 2017. Public ... transparency in public procurement; and greater concerns about efficiency, fairness, and equity. ... government enacted the Public Procurement Act (2007) [1] which provides legislative framework for.

  15. Procurement Career Management Handbook.

    Science.gov (United States)

    Department of the Treasury, Washington, DC.

    This handbook is the result of the Treasury Department's efforts to increase professionalism among its procurement employees nationwide through its Procurement Career Management Program. First, the scope and objectives of the Procurement Career Management Program are discussed. The remaining sections of the handbook deal with the following program…

  16. Public Procurement and Innovation

    DEFF Research Database (Denmark)

    Rolfstam, Max

    be understood as a special case of innovation, where social processes – and consequently the institutions governing these social processes – need to be considered. This book contributes to our understanding with a detailed institutional analysis of the public procurement of innovation.......Max Rolfstam examines the increasing emphasis on public procurement as a means to stimulate innovation and the theoretical implications of this policy development. While ‘regular’ public procurement may be regarded as the outcome of anonymous market processes, public procurement of innovation must...

  17. Monitoring What Governments “Give for” and “Spend on” Vaccine Procurement: Vaccine Procurement Assistance and Vaccine Procurement Baseline

    OpenAIRE

    Nelson, E. A. S.; Bloom, David E.; Mahoney, Richard T.

    2014-01-01

    BACKGROUND: The Global Vaccine Action Plan will require, inter alia, the mobilization of financial resources from donors and national governments - both rich and poor. Vaccine Procurement Assistance (VPA) and Vaccine Procurement Baseline (VPB) are two metrics that could measure government performance and track resources in this arena. VPA is proposed as a new subcategory of Official Development Assistance (ODA) given for the procurement of vaccines and VPB is a previously suggested measure of...

  18. 49 CFR 661.6 - Certification requirements for procurement of steel or manufactured products.

    Science.gov (United States)

    2010-10-01

    ... § 661.6 Certification requirements for procurement of steel or manufactured products. If steel, iron, or... 49 Transportation 7 2010-10-01 2010-10-01 false Certification requirements for procurement of steel or manufactured products. 661.6 Section 661.6 Transportation Other Regulations Relating to...

  19. Ukraine : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2001-01-01

    The main objectives of the country procurement assessment are to diagnose the public procurement system in Ukraine, assess compatibility of the country's laws, policies and procedures with international best practices, review compliance with the procurement laws and regulations and identify areas for improvement of the procurement system in Ukraine. With due recognition of the considerable...

  20. 50 CFR Figure 4 to Part 223 - Georgia TED

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Georgia TED 4 Figure 4 to Part 223 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE MARINE MAMMALS THREATENED MARINE AND ANADROMOUS SPECIES Pt. 223, Fig. 4 Figure 4 to Part 223—Georgia TED EC01JY91.048 [52 FR...

  1. Debating Organ Procurement Policy Without Illusions.

    Science.gov (United States)

    Hippen, Benjamin

    2015-10-01

    In this perspective, I review and critique claims that the transplant waiting list overstates the demand for kidneys and correct a few mischaracterizations of some structural barriers to increasing rates of transplantation. The solutions to the shortage of organs proffered by opponents of financial incentives fail to account for a panoply of clinical, regulatory, and financial realities of transplantation centers in the United States in ways that undermine the thesis that a trial of financial incentives for organ procurement is not warranted at this time. I conclude with some personal pessimistic reflections on the progress of this debate. Copyright © 2015 National Kidney Foundation, Inc. Published by Elsevier Inc. All rights reserved.

  2. Sustainable Procurement in Practice: Explaining the Degree of Sustainable Procurement from an Organisational Perspective

    NARCIS (Netherlands)

    J. Grandia (Jolien); S.M. Groeneveld (Sandra); B.S. Kuipers (Ben); A.J. Steijn (Bram)

    2013-01-01

    textabstractSustainable procurement is often used to reduce negative environmental impacts related to production and consumption. Several studies in the sustainable procurement literature have identified potential drivers of and barriers to sustainable procurement, which are often organisational in

  3. 76 FR 20249 - Department of State Acquisition Regulation

    Science.gov (United States)

    2011-04-12

    ... number 1405-0050. List of Subjects in 48 CFR Parts 604, 637 and 652 Government procurement, Electronic... Latvanas, Procurement Analyst, Department of State, Office of the Procurement Executive, 2201 C Street, NW..., local, and tribal governments, in the aggregate, or by the private sector, of $100 million or more in...

  4. Separating 2,3-butanediol from fermentation broth using n-butylaldehyde

    Directory of Open Access Journals (Sweden)

    Yanjun Li

    2016-09-01

    Full Text Available In this paper, a complete separation process for 2,3-butanediol fermentation broth has been developed using reactive-extraction and reactive-distillation. n-Butylaldehyde can be used as both reactant and extractant in the process. Equilibrium and kinetics were studied on the reaction between 2,3-butanediol and n-butylaldehyde using different catalysts. Pseudo-Homogeneous model was used to describe the reaction behavior. The kinetic parameters were determined by analyzing experimental data. The results revealed that the reaction enthalpy ΔrH0 = −21.58 ± 1.63 kJ mol−1. The reaction rate was found to increase with increasing reaction temperature and had a linear correlation with catalyst amount. The activity energy for H2SO4 system and HCl system was 57.52 ± 5.35 and 58.14 ± 5.06 kJ mol−1, respectively. Feasible operation conditions have been obtained as follows: volume ratio of n-butylaldehyde to fermentation broth is 0.2; feed molar ratio of water and 2-propyl-4,5-dimethyl-1,3-dioxolane (n-butylaldehyde 2,3-butanediol acetal for hydrolysis is 3.0; theoretical plate number for reactive-distillation column is 10 with concentration of HCl solution of 0.5 mol/L. With the above conditions, more than 90% of 2,3-butanediol can be recovered from fermentation broth by reactive-extraction process and the purity of final product can be over 99%.

  5. 6 CFR 13.23 - Subpoenas for attendance at hearing.

    Science.gov (United States)

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Subpoenas for attendance at hearing. 13.23 Section 13.23 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY PROGRAM FRAUD CIVIL REMEDIES § 13.23 Subpoenas for attendance at hearing. (a) A party wishing to procure the...

  6. PROCUREMENT IN THE SUPPLY CHAIN: AN ELEMENT OF HOTEL PRODUCT COMPETITIVENESS

    Directory of Open Access Journals (Sweden)

    Edna Mrnjavac

    2016-12-01

    organization is essential for the application of the supply-chain principles, but it can also have the opposite effect. The principles of supply chain organization and management are present in all investigated hotels, but to varying degrees. While obtaining the lowest price is singled out as the primary goal of procurement, the need to take into account other elements, such as the quality of procurement, products and services, is also emphasized because this makes it possible to create a hotel product that guests will be satisfied with. Conclusion: The presence of supply-chain elements in hotel procurement correlates with the size of the hotel enterprise, but not with the type of hotel or its location (type of tourist destination. The organizational basis of stand-alone hotels is better suited for the development of supply chains. Their less-formal business organization and decentralized procurement provide a suitable environment for focusing on and effectively managing the business process to enhance product quality. In contrast, centralized procurement embedded in the more rigid organization of hotel enterprises contains a number of barriers that go against the supply chain concept. Partly for this reason, the primary goal of hotel enterprises is price, while quality is only a secondary goal. Networked supply-chain structures are present in both cases, and high on the list of procurement goals is the importance of building sound relationships with prominent suppliers. Also important is that procurement organized in this way focuses on the long term; the supplier market and procurement terms are analyzed periodically and, if necessary, changes are made regarding suppliers and supplier relationships.

  7. Ethical criteria for procuring and distributing organs for transplantation.

    Science.gov (United States)

    Childress, J F

    1989-01-01

    This article provides an ethical analysis and assessment of various actual and proposed policies of organ procurement and distribution in light of moral principles already embedded in U.S. institutions, laws, policies, and practices. Evaluating different methods of acquisition of human body parts--donation (express and presumed), sales, abandonment, and expropriation--the author argues for laws and policies, including required request, to maintain and facilitate express donation of organs by individuals and their families. Such laws and policies need adequate time for a determination of their effectiveness before society moves to other major alternatives, such as a market. In organ allocation and distribution, which have close moral connections with organ procurement, the author defends the judgment of the federal Task Force on Organ Transplantation that the community should have dispositional authority over donated organs, that professionals should be viewed as trustees and stewards of donated organs, and that the public should be heavily involved in the formation of policies of allocation and distribution. Concentrating on policies being developed in the United Network for Organ Sharing, the author examines the point system for cadaveric kidneys, the access of foreign nationals to organs donated in the U.S., and the multiple listings of patients seeking transplants. He concludes by identifying two major problems of equitable access to donated organs that will have to be addressed by social institutions other than UNOS: access to the waiting list for donated organs and the role of ability to pay in extrarenal transplants.

  8. Evolution in public procurement and the impact of e-procurement platforms: A case study

    OpenAIRE

    Leal, Pedro Manuel Mariano

    2010-01-01

    A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics The aim of this project is to understand the evolution that occurred in the public procurement due to the new Public Contracts Code that changed the procurement procedures and forced public entities to use electronic procurement platforms. This work is a contribution to the understanding of the main procurement changes with this ...

  9. Croatia : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2005-01-01

    Based on the CPAR's analysis of the legislative framework, procurement practices, institutional capacity and the opportunity for corruption, the assessment found that the environment for conducting public procurement in Croatia is average. This report makes a series of recommendations designed to strengthen the public procurement environment of Croatia, including legislative reform, improving procurement procedures and practices, institutional reform, capacity building, and the development of...

  10. Spare parts classification and procurement program

    International Nuclear Information System (INIS)

    Adlon, K.L.; Hassaballa, M.M.

    1986-01-01

    The cost benefits have been demonstrated for an integrated program, which is currently being implemented for two PWR stations with two 1100-MW units each. The component classification efforts reduced the number of safety-related components in several systems. Furthermore, the knowledge of the component specific function has contributed to the reduction of many safety-related parts per component, in addition to ensuring the procurement of parts to the correct safety level. The use of qualified commercial grade parts and components with their lower cost and reasonable procurement lead time compared to their 10 CFR 21 counterparts has a pronounced economic effect on the utility balance sheets

  11. List of the nuclear power plants in the world

    International Nuclear Information System (INIS)

    Bebin, J.

    1980-12-01

    The world list of nuclear power stations concerns all the units definitely ordered, whether in operation, definitely shut down, in any stage of construction or even put back to an indefinite date. Cancelled power stations are mentioned, save those cancelled during the present year. Shut down power stations are included in 'power stations ordered' but are deducted as from the date of closure. The complex of power stations is divided into two lists: List A (classified by name of builder) and List B (classified by country) [fr

  12. Detection of non-thermal X-ray emission in the lobes and jets of Cygnus A

    Science.gov (United States)

    de Vries, M. N.; Wise, M. W.; Huppenkothen, D.; Nulsen, P. E. J.; Snios, B.; Hardcastle, M. J.; Birkinshaw, M.; Worrall, D. M.; Duffy, R. T.; McNamara, B. R.

    2018-06-01

    We present a spectral analysis of the lobes and X-ray jets of Cygnus A, using more than 2 Ms of Chandra observations. The X-ray jets are misaligned with the radio jets and significantly wider. We detect non-thermal emission components in both lobes and jets. For the eastern lobe and jet, we find 1 keV flux densities of 71_{-10}^{+10} nJy and 24_{-4}^{+4} nJy, and photon indices of 1.72_{-0.03}^{+0.03} and 1.64_{-0.04}^{+0.04} respectively. For the western lobe and jet, we find flux densities of 50_{-13}^{+12} nJy and 13_{-5}^{+5} nJy, and photon indices of 1.97_{-0.10}^{+0.23} and 1.86_{-0.12}^{+0.18} respectively. Using these results, we modeled the electron energy distributions of the lobes as broken power laws with age breaks. We find that a significant population of non-radiating particles is required to account for the total pressure of the eastern lobe. In the western lobe, no such population is required and the low energy cutoff to the electron distribution there needs to be raised to obtain pressures consistent with observations. This discrepancy is a consequence of the differing X-ray photon indices, which may indicate that the turnover in the inverse-Compton spectrum of the western lobe is at lower energies than in the eastern lobe. We modeled the emission from both jets as inverse-Compton emission. There is a narrow region of parameter space for which the X-ray jet can be a relic of an earlier active phase, although lack of knowledge about the jet's electron distribution and particle content makes the modelling uncertain.

  13. TubercuList--10 years after.

    Science.gov (United States)

    Lew, Jocelyne M; Kapopoulou, Adamandia; Jones, Louis M; Cole, Stewart T

    2011-01-01

    TubercuList (http://tuberculist.epfl.ch/), the relational database that presents genome-derived information about H37Rv, the paradigm strain of Mycobacterium tuberculosis, has been active for ten years and now presents its twentieth release. Here, we describe some of the recent changes that have resulted from manual annotation with information from the scientific literature. Through manual curation, TubercuList strives to provide current gene-based information and is thus distinguished from other online sources of genome sequence data for M. tuberculosis. New, mostly small, genes have been discovered and the coordinates of some existing coding sequences have been changed when bioinformatics or experimental data suggest that this is required. Nucleotides that are polymorphic between different sources of H37Rv are annotated and gene essentiality data have been updated. A host of functional information has been gleaned from the literature and many new activities of proteins and RNAs have been included. To facilitate basic and translational research, TubercuList also provides links to other specialized databases that present diverse datasets such as 3D-structures, expression profiles, drug development criteria and drug resistance information, in addition to direct access to PubMed articles pertinent to particular genes. TubercuList has been and remains a highly valuable tool for the tuberculosis research community with >75,000 visitors per month. Copyright © 2010 Elsevier Ltd. All rights reserved.

  14. 75 FR 49510 - Credit Watch Termination Initiative

    Science.gov (United States)

    2010-08-13

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5411-N-02] Credit Watch Termination Initiative AGENCY: Office of the Assistant Secretary for Housing--Federal Housing Commissioner, HUD. ACTION... FHA Credit Watch Termination Initiative. This notice includes a list of mortgagees which have had...

  15. 75 FR 17944 - Credit Watch Termination Initiative

    Science.gov (United States)

    2010-04-08

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5411-N-01] Credit Watch Termination Initiative AGENCY: Office of the Assistant Secretary for Housing--Federal Housing Commissioner, HUD. ACTION... FHA Credit Watch Termination Initiative. This notice includes a list of mortgagees which have had...

  16. 76 FR 27274 - Defense Federal Acquisition Regulation Supplement; Technical Amendment

    Science.gov (United States)

    2011-05-11

    ... procurement programs, it must provide written notice of the determination to the GSA Suspension and Debarment Official. List of Subjects in 48 CFR Part 209 Government procurement. Ynette R. Shelkin, Editor, Defense... suspended from procurement programs, it must provide written notice of the determination to the General...

  17. 75 FR 6795 - Designation of Biobased Items for Federal Procurement

    Science.gov (United States)

    2010-02-10

    ... polystyrene foam recycling products; heat transfer fluids; ink removers and cleaners; mulch and compost... to the purpose of the Federal contract. In implementing the preferred procurement program for... general purpose hand washing may not need to meet these specifications. Where such subgroups exist, USDA...

  18. The impact of HTA and procurement practices on the selection and prices of medical devices.

    Science.gov (United States)

    Callea, Giuditta; Armeni, Patrizio; Marsilio, Marta; Jommi, Claudio; Tarricone, Rosanna

    2017-02-01

    Technological innovation in healthcare yields better health outcomes but also drives healthcare expenditure, and governments are struggling to maintain an appropriate balance between patient access to modern care and the economic sustainability of healthcare systems. Health Technology Assessment (HTA) and centralized procurement are increasingly used to govern the introduction and diffusion of new technologies in an effort to make access to innovation financially sustainable. However, little empirical evidence is available to determine how they affect the selection of new technologies and unit prices. This paper focuses on medical devices (MDs) and investigates the combined effect of various HTA governance models and procurement practices on the two steps of the MD purchasing process (i.e., selecting the product and setting the unit price). Our analyses are based on primary data collected through a national survey of Italian public hospitals. The Italian National Health Service is an ideal case study because it is highly decentralized and because regions have adopted different HTA governance models (i.e., regional, hospital-based, double-level or no HTA), often in combination with centralized regional procurement programs. Hence, the Italian case allows us to test the impact of different combinations of HTA models and procurement programs in the various regions. The results show that regional HTA increases the probability of purchasing the costliest devices, whereas hospital-based HTA functions more like a cost-containment unit. Centralized regional procurement does not significantly affect MD selection and is associated with a reduction in the MD unit price: on average, hospitals located in regions with centralized procurement pay 10.1% less for the same product. Hospitals located in regions with active regional HTA programs pay higher prices for the same device (+23.2% for inexpensive products), whereas hospitals that have developed internal HTA programs pay 8

  19. The high-resolution structure of the Centaurus A nucleus at 2.3 and 8.4 GHz

    International Nuclear Information System (INIS)

    Meier, D.L.; Preston, R.A.; Morabito, D.D.

    1989-01-01

    VLBI observations of the nucleus of Centaurus A have been made at two frequencies with an array of five Australian radio telescopes as part of the Southern Hemisphere VLBI Experiment. Observations were made at 2.3 GHz with all five antennas, while only two were employed at 8.4 GHz. At 2.3 GHz seven tracks in the (u,v) plane with coverage of 6-8 hr each were obtained, yielding significant information on the structure of the nuclear jet. At 8.4 GHz a compact unresolved core was detected as well. It is found that the source consists of the compact self-absorbed core, a jet containing a set of three knots extending from 100 to 160 mas from the core, and a very long, narrow component elongated along the same position angle as the knots. The allowable range for the position angle of the jet is 51 + or - 3 deg, in agreement with that of the radio and X-ray structure on arcsecond and arcminute scales. The jet has brightened at 2.3 GHz by about 4 Jy, a factor of nearly 3, since the early 1970s, 1.8 Jy of which has occurred in the last 2 yr with no discernable changes in structure. 21 refs

  20. Synthesis and enzyme inhibitory studies of some new N-alkylated/aralkylated N-(4-ethoxyphenyl)-2,3-drobenzo-(1,4)-dioxin-6-sulfonamides

    International Nuclear Information System (INIS)

    Abbasi, M.A.; Islam, M.; Rehman, A.U.; Siddiqui, S.Z.

    2016-01-01

    The research endeavor was aimed to synthesize N-alkyl/aralkylated-N-(4-ethoxyphenyl)-2,3-dihydrobenzo-(1,4)-dioxine-6 sulfonamides and to evaluate their enzyme inhibitory potential. The target molecules were synthesized in two steps. The first step involved the reaction of 4-ethoxyaniline (1) with N-2,3-dihydrobenzo(1,4)-dioxin-6-sulfonyl chloride (2) under dynamic pH control maintained by 10% aqueous Na/sub 2/CO/sub 3/ to yield N-(4-ethoxyphenyl)-2,3-dihydrobenzo-(1,4)-dioxine-6-sulfonamide (3). In second step parent compound 3 was reacted with various alkyl/aralkyl halides (4a-l) in N,N'-dimethylformamide and catalytic amount of lithium hydride to accomplish some new N-alkyl/aralkylated-N-(4-ethoxyphenyl)-2,3-dihydrobenzo-(1,4)-dioxine-6 sulfonamides (5a-l). Probable structures of the synthesized compounds were characterized by contemporary spectral techniques i.e. IR, 1H-NMR and EIMS and were finally evaluated for enzyme inhibitory potential against a-glucosidase and urease. The synthesized compounds exhibited moderate to weak therapeutic potential throughout the series. (author)

  1. 40 CFR 35.6565 - Procurement methods.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...

  2. THE BARRIERS OF IMPLEMENTING E-PROCUREMENT

    Directory of Open Access Journals (Sweden)

    Corina Pop Sitar

    2011-01-01

    Full Text Available The concept of e-procurement has many different meanings ranging from shopping on theinternet (through reverse auction to collaborative initiatives taking place in virtualmeetings. There are many forms of e-procurement that can be found in the literature. In thispaper we define the most important forms of e-procurement. Next, we present the mainbarriers of implementing an e-procurement found in the literature. Furthermore, we presenta matrix with the main barriers of e-procurement classified in four main categories. Finally,we elaborated for managers some guidelines in order to overcome the barriers ofimplementing e-procurement.

  3. Public Procurement of Innovation in Sweden

    DEFF Research Database (Denmark)

    Rolfstam, Max; Ågren, Robert

    2014-01-01

    Sweden is often thought of as a country with a strong tradition for using public procurement as a means to stimulate innovation. Early on, Sweden recognized and developed procedures for using public procurement as a technologydevelopment tool. After a period where emphasis was put on this aspect ...... government authorities to engage in public procurement for innovation, and by issuing guidance on the topic.......Sweden is often thought of as a country with a strong tradition for using public procurement as a means to stimulate innovation. Early on, Sweden recognized and developed procedures for using public procurement as a technologydevelopment tool. After a period where emphasis was put on this aspect...... of public procurement Sweden dropped many policy initiatives within this field. This was in part due to neo-liberal movements during the 1980s which in interaction with a distributed institutional setup led to the removal of incentives for a procuring authority to engage in public procurement of innovation...

  4. PROCUREMENT INSOURCING VS. PROCUREMENT OUTSOURCING: EVIDENCE FROM SERBIA

    Directory of Open Access Journals (Sweden)

    Slobodan Acimovic

    2016-11-01

    Full Text Available One of the most important strategic decisions of a company is to choose whether to insource or outsource a particular group of activities or a business function. The trend of outsourcing those activities which do not form a part of the company core competences is becoming more and more present in business practice. The aim of the analysis within this paper is to review the mentioned trend from the position of organizing the company procurement activities. The analysis shows that there is no unique trend concerning outsourcing all logistics activities, which do not form a part of the company core competences. Unlike the majority of other logistics activities, which as non-basic, tend to be outsourced, procurement dominantly stays insourced. Finally, based on the empirical evidence obtained from a survey carried out among 52 companies in Serbia, it is concluded that even if procurement is outsourced, this trend is more present among service than production companies.

  5. 10 CFR 725.23 - Terms and conditions of access.

    Science.gov (United States)

    2010-01-01

    ... warranty or other representation, expressed or implied, (1) with respect to the accuracy, completeness or... 10 Energy 4 2010-01-01 2010-01-01 false Terms and conditions of access. 725.23 Section 725.23 Energy DEPARTMENT OF ENERGY PERMITS FOR ACCESS TO RESTRICTED DATA Permits § 725.23 Terms and conditions...

  6. 77 FR 33269 - Designation of Product Categories for Federal Procurement

    Science.gov (United States)

    2012-06-05

    ... procurement program (one part of the BioPreferred Program) is available on the Internet at http://www... program includes the following three statutory preference programs for designated products: the Bio... including the National Industries for the Blind (NIB) and NISH offer products and services for preferred...

  7. Study and use of an infrared camera optimized for ground based observations in the 10 micron wavelength range

    International Nuclear Information System (INIS)

    Remy, Sophie

    1991-01-01

    Astronomical observations in the 10 micron atmospheric window provide very important information for many of astrophysical topics. But because of the very large terrestrial photon background at that wavelength, ground based observations have been impeded. On the other band, the ground based telescopes offer a greater angular resolution than the spatially based telescopes. The recent development of detector arrays for the mid infrared range made easier the development of infrared cameras with optimized detectors for astronomical observations from the ground. The CAMIRAS infrared camera, built by the 'Service d'Astrophysique' in Saclay is the instrument we have studied and we present its performances. Its sensitivity, given for an integration time of one minute on source and a signal to noise ratio of 3, is 0.15 Jy for punctual sources, and 20 mJy arcs"-"2 for extended sources. But we need to get rid of the enormous photon background so we have to find a better way of observation based on modulation techniques as 'chopping' or 'nodding'. Thus we show that a modulation about 1 Hz is satisfactory with our detectors arrays without perturbing the signal to noise ratio. As we have a good instrument and because we are able to get rid of the photon background, we can study astronomical objects. Results from a comet, dusty stellar disks, and an ultra-luminous galaxy are presented. (author) [fr

  8. Influența Directivei 2014/23/UE privind concesiunile asupra dreptului național român

    Directory of Open Access Journals (Sweden)

    Cătălina Georgeta DINU

    2016-12-01

    Full Text Available Concession contracts were neglected by the European law, especially by the directives on public procurement in 2004, which were only marginally covering public works concessions and the concessions were not subject to any specific regulation. Therefore, the Directive 2014/23/EU comes to cover a dead angle of the European law of public business contracts. Concessions are still in the same shadow cone on domestic plan, the Romanian legislation waiving in 2006 a legislative act dedicated exclusively to these contracts, as a result of the directives transposition at that moment. Yet this time, by implementing the Directive 2014/23/EU, the institution of concession is reinvigorated, to the detriment of the voices which sustained the lack of practical importance of this type of contract and of a distinction between this and public procurement. We are interested to analyze the manner in which this transposition was performed, both in form, and especially in substance: was the European legislation adapted by developing a clear domestic legislative framework or are we witnessing an ad literam assumption, which will enforce multiple amendments and supplements, similarly to the previous legislative experience in the field; are the assigned guided principles observed, are unequivocal procedures regulated and characterized by transparency?

  9. The International Experience in Public Procurement

    Directory of Open Access Journals (Sweden)

    Pysmenna Mariia S.

    2017-11-01

    Full Text Available The article is aimed at generalizing the foreign experience of implementing public procurement, analyzing peculiarities of organizational, normative and procedural provision of public procurement in the Member States of the European Union. The relevance of the research topic is due to the need to harmonize the procurement policy of the Government of Ukraine with the international legal framework and with broad political objectives within the European integration strategy. The organizational framework and principles of implementing public procurement in the EU Member States were analyzed. Special attention was paid to normative provision of public procurement by the EU Member States; peculiarities of the use of national or harmonized rules of public procurement in accordance with the amount of the procurement contract; restrictions and conditions for public authorities in the selection of applicants for bidding. Five types of public procurement procedures used in the EU have been characterized, namely: open procedure, limited procedure, negotiation procedure, competitive dialog, electronic auctions. The need to address the social and legal aspects of public procurement in international practice has been substantiated and the possibilities for resolving these problems have been presented.

  10. Impact of adverse pancreatic injury at surgical procurement upon islet isolation outcome.

    Science.gov (United States)

    Andres, Axel; Kin, Tatsuya; O'Gorman, Doug; Bigam, David; Kneteman, Norman; Senior, Peter; Shapiro, Am James

    2014-11-01

    The consequence of a pancreas injury during the procurement for islet isolation purpose is unknown. The goal of this work was to assess the injuries of the pancreata procured for islet isolation, and to determine their effect on the islet yield. Between January 2007 and October 2013, we prospectively documented every injury of the pancreata processed in our centre for islet isolation. Injuries involving the main duct were classified as major, the others as minor. Donors' characteristics and islet yields were compared between the groups of injuries. A pancreas injury was identified in 42 of 452 pancreata received for islet isolation (9.3%). In 15 cases, the injury was major (3.3% of all pancreata). Although a minor injury did not affect the islet yield, a major injury was significantly associated with unfavourable outcomes (postpurification mean islet equivalent of 364 ± 181, 405 ± 190 and 230 ± 115 × 10(3) for absence of injury, minor injury and major injury, respectively). A major injury was significantly more prevalent in lean and short donors. We recommend assessing the quality of the pancreas in the islet isolation centre before starting the isolation procedure. Each centre should determine its own policy based on its financial resources and on the wait list. © 2014 Steunstichting ESOT.

  11. PUBLIC PROCUREMENT IN GHANA: THE IMPLEMENTATION CHALLENGES TO THE PUBLIC PROCUREMENT LAW 2003 (ACT 663

    Directory of Open Access Journals (Sweden)

    Ameyaw, Collins

    2012-08-01

    Full Text Available The purpose of this study was to identify various implementation bottlenecks to the Ghana Public Procurement Law 2003 (Act 663. The study adopted multiple research approaches, including; review of relevant literature, interviews and questionnaire survey of 49 District Assemblies and Metropolitan and Municipal Assemblies in the Ashanti and Brong Ahafo Regions of Ghana. The study identified low capacity of procurement professionals, low interaction between procurement entities and Public Procurement Authority (PPA, deliberate controlling of competition, non-compliance with provisions of the law, splitting of contracts into smaller lots, lack of funds and non-cooperativeness of suppliers, as the major challenges militating against the implementation of the Public Procurement Law.

  12. ALMA observations of the host galaxy of GRB 090423 at z = 8.23: deep limits on obscured star formation 630 million years after the big bang

    Energy Technology Data Exchange (ETDEWEB)

    Berger, E.; Zauderer, B. A.; Chary, R.-R.; Laskar, T.; Chornock, R.; Davies, J. E. [Harvard-Smithsonian Center for Astrophysics, 60 Garden Street, Cambridge, MA 02138 (United States); Tanvir, N. R. [Department of Physics and Astronomy, University of Leicester, University Road, Leicester LE1 7RH (United Kingdom); Stanway, E. R.; Levan, A. J. [Department of Physics, University of Warwick, Gibbet Hill Road, Coventry CV4 7AL (United Kingdom); Levesque, E. M. [CASA, University of Colorado UCB 389, Boulder, CO 80309 (United States)

    2014-12-01

    We present rest-frame far-infrared (FIR) and optical observations of the host galaxy of GRB 090423 at z = 8.23 from the Atacama Large Millimeter Array (ALMA) and the Spitzer Space Telescope, respectively. The host remains undetected to 3σ limits of F {sub ν}(222 GHz) ≲ 33 μJy and F {sub ν}(3.6 μm) ≲ 81 nJy. The FIR limit is about 20 times fainter than the luminosity of the local ULIRG Arp 220 and comparable to the local starburst M 82. Comparing this with model spectral energy distributions, we place a limit on the infrared (IR) luminosity of L {sub IR}(8-1000 μm) ≲ 3 × 10{sup 10} L {sub ☉}, corresponding to a limit on the obscured star formation rate of SFR{sub IR}≲5 M {sub ☉} yr{sup –1}. For comparison, the limit on the unobscured star formation rate from Hubble Space Telescope rest-frame ultraviolet (UV) observations is SFR{sub UV} ≲ 1 M {sub ☉} yr{sup –1}. We also place a limit on the host galaxy stellar mass of M {sub *} ≲ 5 × 10{sup 7} M {sub ☉} (for a stellar population age of 100 Myr and constant star formation rate). Finally, we compare our millimeter observations to those of field galaxies at z ≳ 4 (Lyman break galaxies, Lyα emitters, and submillimeter galaxies) and find that our limit on the FIR luminosity is the most constraining to date, although the field galaxies have much larger rest-frame UV/optical luminosities than the host of GRB 090423 by virtue of their selection techniques. We conclude that GRB host galaxies at z ≳ 4, especially those with measured interstellar medium metallicities from afterglow spectroscopy, are an attractive sample for future ALMA studies of high redshift obscured star formation.

  13. 50 CFR Table 5 (south) to Part 660... - 2009-2010 Trip Limits for Open Access Gears South of 40°10N. Lat.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 9 2010-10-01 2010-10-01 false 2009-2010 Trip Limits for Open Access Gears South of 40°10â² N. Lat. 5 Table 5 (South) to Part 660, Subpart G Wildlife and Fisheries FISHERY... Trip Limits for Open Access Gears South of 40°10N. Lat. Link to an amendment published at 75 FR 60995...

  14. 50 CFR Table 5 (north) to Part 660... - 2009-2010 Trip Limits for Open Access Gears North of 40°10N. Lat.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 9 2010-10-01 2010-10-01 false 2009-2010 Trip Limits for Open Access Gears North of 40°10â² N. Lat. 5 Table 5 (North) to Part 660, Subpart G Wildlife and Fisheries FISHERY... Trip Limits for Open Access Gears North of 40°10N. Lat. Link to an amendment published at 75 FR 60995...

  15. 75 FR 17946 - Family Report, MTW Family Report

    Science.gov (United States)

    2010-04-08

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5376-N-25] Family Report, MTW Family... comments on the subject proposal. Tenant data is collected to understand demographic, family profile.... This Notice Also Lists the Following Information Title of Proposal: Family Report, MTW Family Report...

  16. 17 CFR 2.3 - Prohibitions against misuse of seal.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Prohibitions against misuse of seal. 2.3 Section 2.3 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION OFFICIAL... character, or with wrongful or fraudulent intent, using, buying, procuring, selling or transferring to...

  17. Procurement Tracking System (PTS)

    Data.gov (United States)

    Office of Personnel Management — The Procurement Tracking System (PTS) is used solely by the procurement staff of the Office of the Inspector General (OIG) at the U.S. Office of Personnel Management...

  18. Brexit and government procurement

    OpenAIRE

    Dawar, Kamala

    2017-01-01

    This briefing paper looks at some of the legal issues that will affect the UK’s public procurement laws and policies following Brexit. For, once the UK revokes the European Communities Act 1972, it will no longer be obligated to follow the EU Procurement Directives, nor will it be subject to the commitments the EU has signed up to on behalf of the UK in the WTO Government Procurement Agreement (GPA) and in Preferential Trade Agreements (PTAs). Additionally, under the Devolution Settlement of ...

  19. The World Bank Group and Public Procurement--An Independent Evaluation : Volume 1. Building Procurement Capacity and Systems

    OpenAIRE

    Independent Evaluation Group

    2014-01-01

    Good public procurement practices are a major determinant of the effectiveness of public expenditure. On behalf of their citizens, governments typically spend as much as 5-20 percent of their gross domestic product on procurement of goods and services, and effective procurement policies enable better use of government budgets. Good national procurement practices are therefore an essential ...

  20. THE ORIGIN OF THE INFRARED EMISSION IN RADIO GALAXIES. II. ANALYSIS OF MID- TO FAR-INFRARED SPITZER OBSERVATIONS OF THE 2JY SAMPLE

    NARCIS (Netherlands)

    Dicken, D.; Tadhunter, C.; Axon, D.; Morganti, R.; Inskip, K. J.; Holt, J.; Delgado, R. Gonzalez; Groves, B.

    2009-01-01

    We present an analysis of deep mid- to far-infrared (MFIR) Spitzer photometric observations of the southern 2Jy sample of powerful radio sources (0.05

  1. 76 FR 39234 - Federal Acquisition Regulation; Unique Procurement Instrument Identifier

    Science.gov (United States)

    2011-07-05

    ..., therefore, was not subject to review under section 6(b) of E.O. 12866, Regulatory Planning and Review, dated... for procurement actions, such as delivery and task orders or basic ordering agreements, the order or... Instrument Identifier (PIID). Agencies shall have in place a process that ensures that each PIID reported to...

  2. Tanzania : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2003-01-01

    This Country Procurement Assessment Report (CPAR)intends to determine the compatibility of national procurement law, and practices, with the principles of economy, and with international procurement practices. This CPAR, the second of its kind in Tanzania, looks at the legislative framework, the performance of regulatory functions, the enforcement regime, and the capacity of public sector ...

  3. Industry activities to resolve utility procurement issues

    International Nuclear Information System (INIS)

    Rosch, F.

    1993-01-01

    There are several industry organizations which are active in assisting the utilities in their equipment procurement enhancement. They include the Nuclear Management Resources Council (NUMARC), the Electric Power Research Institute (EPRI), and the Nuclear Procurement Issues Committee (NUPIC). The products include the NUMARC Procurement Initiatives, EPRI procurement related guidelines and databases, and NUPIC joint audits and commercial grade surveys. The industry procurement activities and products are reviewed, and their use by utilities to enhance their procurement process is related. 1 fig

  4. Procurement strategic analysis of nuclear safety equipment

    International Nuclear Information System (INIS)

    Wu Caixia; Yang Haifeng; Li Xiaoyang; Li Shixin

    2013-01-01

    The nuclear power development plan in China puts forward a challenge on procurement of nuclear safety equipment. Based on the characteristics of the procurement of nuclear safety equipment, requirements are raised for procurement process, including further clarification of equipment technical specification, establishment and improvement of the expert database of the nuclear power industry, adoption of more reasonable evaluation method and establishment of a unified platform for nuclear power plants to procure nuclear safety equipment. This paper makes recommendation of procurement strategy for nuclear power production enterprises from following aspects, making a plan of procurement progress, dividing procurement packages rationally, establishing supplier database through qualification review and implementing classified management, promoting localization process of key equipment continually and further improving the system and mechanism of procurement of nuclear safety equipment. (authors)

  5. Benchmarking the Performance of Construction Procurement Methods against Selection Criteria in Nigeria

    Directory of Open Access Journals (Sweden)

    Stephen Okunlola Ojo

    2009-01-01

    Full Text Available The study developed performance indices by the widely used procurement options in Nigeria on selection criteria. The traditional mean and standardized ratio were used to form the utility coefficients. Results revealed that performance by the procurement options depended on the respondents’ categorization and cost categorization of projects. Public clients ranked the lump sum contracts more able to achieve speed for projects up to N100 million (Naira while the private clients believe it is the design-build. As regards quality, public clients rated the Build-Own-Operate-Transfer (BOOT system as most able to achieve the quality criterion whereas private clients rated design-build for projects up to N100 million (Naira. The study then concluded that, in the Nigerian construction industry participants do not agree on the performance of the procurement options on selection criteria.

  6. 78 FR 65220 - Defense Federal Acquisition Regulation Supplement: New Designated Country-Croatia (DFARS Case...

    Science.gov (United States)

    2013-10-31

    ... as a new designated country under the World Trade Organization Government Procurement Agreement (WTO..., 2012, the WTO Committee on Government Procurement accepted the European Union notification indicating..., this rule adds Croatia to the list of World Trade Organization Government Procurement Agreement...

  7. Discriminatory public procurement policies

    NARCIS (Netherlands)

    Ssennoga, Francis

    2010-01-01

    To achieve social economic objectives, governments usually institute discriminatory practices in their country’s public procurement framework. Discriminatory procurement is the practice by governments to favour their own domestic suppliers over foreign firms for advertised contracts. Favouring

  8. Launch of the "MICE Procurement" website for your future events

    CERN Multimedia

    The MICE Office team

    2014-01-01

    The number of MICE (Meeting, Incentive, Conference and Event) requests is on the increase and our hotel offer is constantly being developed.   The MICE Office has decided to create a dedicated website in order to offer the best possible service to its users. This site is accessible from the FP webpage (MICE Procurement) using your NICE login. It gives you access to the list of the establishments which have a contract with CERN, grouped by geographic area/star rating, and all related information. The establishments listed on this website can accommodate your local events, organised by CERN or in partnership with an institution. They were selected following a market survey and as a result of a price enquiry in accordance with CERN's Purchasing Rules. We offer a number of standard packages, but we will try to respond to any specific requirements. On the same site you can also access a longer list of hotels (also accessible via the GS website) for which prices and conditions have been nego...

  9. 76 FR 50184 - Procurement List, Additions and Deletions

    Science.gov (United States)

    2011-08-12

    ..., Giant Cupcake, 3pc NSN: M.R. 1151--Set, Pan, Bake, Perfect Brownie Pan, 3pc NSN: M.R. 1152--Set, Pasta Cooker, Blue, Pasta Express, 7pc NSN: M.R. 1155--Glove, Oven, Flexi NSN: M.R. 1156--Device, Cutting.../Location: Laundry Services, U.S. Naval Hospital & Naval Dental Clinic Base, Farenholt Road, Agana Heights...

  10. 76 FR 6452 - Procurement List; Additions and Deletions

    Science.gov (United States)

    2011-02-04

    ... Logistics Agency Troop Support, Philadelphia, PA. Wind Jacket--Layer IV, ECWCS Gen III, Universal Camouflage NSN: 8415-01-546-8657--size X-Small-Short. NSN: 8415-01-546-8667--size X-Small-Regular. NSN: 8415-01...--size X-Large-Regular. NSN: 8415-01-538-6683--size X-Large-Long. NSN: 8415-01-546-8820--size X-Large...

  11. 75 FR 66741 - Procurement List, Additions and Deletions

    Science.gov (United States)

    2010-10-29

    ... Command, Natick, MA. Drawers, Midweight Cold Weather (Gen III) NSN: 8415-01-538-8727--Drawers Size Small... Regular. NSN: 8415-01-538-8747--Drawers Size Large Long. NSN: 8415-01-538-8750--Drawers Size X Large Regular. NSN: 8415-01-538-8751--Drawers Size X Large Long. NSN: 8415-01-545-7672--Drawers Size X Small...

  12. 75 FR 5967 - Procurement List; Additions and Deletions

    Science.gov (United States)

    2010-02-05

    ... 651-F WEST 14TH STREET, PANAMA CITY, FL NPA (Subcontractor): Wiregrass Rehabilitation Center, Inc... Contracting Activity: GSA/FSS OFC SUP CTR--PAPER PRODUCTS, NEW YORK, NY Services Service Type/Location: Food...

  13. 78 FR 24733 - Procurement List, Additions and Deletions

    Science.gov (United States)

    2013-04-26

    ... Purchase From People Who Are Blind or Severely Disabled published notices of proposed additions to the... Services Administration. Portable Desktop Clipboard, 9\\1/2\\ W x 1\\1/2\\ D x 13\\1/2\\ H NSN: 7510-00-NIB-2133... for Purchase From People Who Are Blind or Severely Disabled published notices of proposed deletions...

  14. 78 FR 54870 - Procurement List; Additions and Deletions

    Science.gov (United States)

    2013-09-06

    ...: Integrated Prime Vendor, Supply Chain Management Service(inventory control, obsolescence identification... Customs Enforcement,VA Hudson Valley HealthCare System Campus, Building 7 (Floors 1, 2, 3 & Basement.../Location: Mailing Service, VA Eastern Colorado Health Care System (ECHCS), 1055 Clermont Street, Denver, CO...

  15. 76 FR 9555 - Procurement List; Additions and Deletions

    Science.gov (United States)

    2011-02-18

    ...-8067--Inkjet printer cartridge. NPA: Alabama Industries for the Blind, Talladega, AL. Contracting... Services Administration, New York, NY. Service Service Type/Location: Eyewear Prescription Service...: Winston-Salem Industries for the Blind, Inc., Winston- Salem, NC. Contracting Activity: Department of...

  16. 77 FR 22288 - Procurement List; Additions and Deletions

    Science.gov (United States)

    2012-04-13

    ...: Janitorial/Custodial, U.S. Federal Building, First and Water Street, Alpena, MI. NPA: Northeastern Michigan Rehabilitation and Opportunity Center (NEMROC), Alpena, MI. Contracting Activity: General Services Administration...

  17. 78 FR 52511 - Procurement List; Additions and Deletions

    Science.gov (United States)

    2013-08-23

    ..., W7NX USPFO Activity PA ARNG, Annville, PA. Service Type/Location: Integrated Prime Vendor Supply Chain... related products/services for Expeditionary Force Provider (EFP) Modules and Modification System Cold... Chain Management (SCM) Service to support production, assembly, receipt, storage, packaging...

  18. 78 FR 71581 - Procurement List; Additions and Deletions

    Science.gov (United States)

    2013-11-29

    ... Prime Vendor Supply Chain Management Service [to support production, assembly, receipt, storage...) Modules and Modification System Cold Weather], US Army, Product Manager Force Sustainment Systems, Natick... Army, W6QK ACC-APG Natick, Natick, MA. Service Type/Location: Integrated Prime Vendor, Supply Chain...

  19. 78 FR 46926 - Procurement List Additions and Deletions

    Science.gov (United States)

    2013-08-02

    ... Oklahoma City Air Logistics Center (FA8126 AFSC PZIMB), Tinker Air Force Base, OK. Services Service Type..., Inc., Sedalia, MO Contracting Activity: Dept of the Army, W071 ENDIST Kansas City, Kansas City, MO... Contracting Activity: General Services Administration, Kansas City, MO Scarf, Headover NSN: 8440-01-291-5451...

  20. 77 FR 11071 - Procurement List; Additions and Deletions

    Science.gov (United States)

    2012-02-24

    ... Logistics Agency Troop Support, Philadelphia, PA. NSN: 7490-01-483-8984--Paper Shredder, Cross Cut. NSN: 7490-01-483-8985--Paper Shredder, Strip Cut. NSN: 7490-01-483-8990--Paper Shredder, Strip Cut. NSN: 7490-01-483-8991--Paper Shredder, Cross Cut. NPA: L.C. Industries for the Blind, Inc., Durham, NC...

  1. 76 FR 51954 - Procurement List Additions And Deletions

    Science.gov (United States)

    2011-08-19

    ... Services Administration. NSN: 8465-01-580-1316--Hydration System, MOLLE Components, OCP NSN: The Lighthouse..., MOLLE Components, Operation Enduring Freedom Camouflage Pattern (OCP) Multicam NSN: Lions Services, Inc., Charlotte, NC NSN: 8465-01-580-1303--Entrenching Tool [[Page 51955

  2. 75 FR 34703 - Procurement List; Additions and Deletions

    Science.gov (United States)

    2010-06-18

    .... Contracting Activity: DEPT OF THE ARMY, XR W2DF RDECOM ACQ CTR NATICK, NATICK, MA. Service Type/Location: Car Wash Service, Customs and Border Protection/Indio Border Station, 83-801 Vin Deo Circle, Indio, CA. NPA...

  3. 76 FR 27999 - Procurement List; Addition and Deletion

    Science.gov (United States)

    2011-05-13

    ...: Base Supply Center, Rock Island Arsenal, 3154 Rodman Avenue, Rock Island, IL. NPA: Association for Retarded Citizens of Rock Island County, Rock Island, IL. Contracting Activity: Dept of the Army, SR W0K8 USA ROCK ISL Arsenal, Rock Island, IL. [[Page 28000

  4. The ins and outs of a list of plays by Calderón

    Directory of Open Access Journals (Sweden)

    Erik Coenen

    2009-06-01

    Full Text Available In 1682, Don Juan de Vera Tassis published two lists of plays circulating under Calderón’s name: one in which he listed those plays he considered really written by Calderón, and another one including those plays which he believed were not his. These lists are the longest of their sort which has come down to us from the 17th century. In this paper, the internal organization of these lists is examined, as well as the possible origin of the knowledge reflected in them, not only so as to determine their degree of authority, but also for what they tell us about the texts which this posthumous editor of 108 plays by Calderón had at his disposal.

  5. Slovakia : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2001-01-01

    This update of the 1995 CPAR is based on the September 1999 PPA and the findings of the Bank CPAR mission to Slovakia in November 1999. The 1999 Public Procurement Act (PPA) is an improvement upon the previous PPAs in some respects, including the creation of an OPP, more detailed and clear procurement procedures, accreditation of procurement professionals, introduction of the Public Procu...

  6. 76 FR 72976 - Manufacturer of Controlled Substances; Notice of Registration

    Science.gov (United States)

    2011-11-28

    ..., 2011, 76 FR 36577, Boehringer Ingelheim Chemicals, Inc., 2820 N. Normandy Drive, Petersburg, Virginia... Boehringer Ingelheim Chemicals, Inc., to manufacture the listed basic classes of controlled substances is consistent with the public interest at this time. DEA has investigated Boehringer Ingelheim Chemicals, Inc...

  7. 76 FR 9734 - Endangered and Threatened Species; Proposed Threatened Status for Distinct Population Segments of...

    Science.gov (United States)

    2011-02-22

    ... Population Segments of the Bearded Seal AGENCY: National Marine Fisheries Service (NMFS), National Oceanic... December 10, 2010, we, NMFS, published a proposed rule to list the Beringia and Okhotsk Distinct Population..., 2010 (75 FR 77476), we published a proposed rule to list the Beringia and Okhotsk Distinct Population...

  8. ONLINE PROCUREMENT IN SME`s

    Directory of Open Access Journals (Sweden)

    Daniela ICHIM

    2017-12-01

    Full Text Available E-Marketplaces are new business places for buying, selling products and services in many industries to support customers. The emergence of business-to-business (B2B in the online environment has opened up opportunities for effective online transactions between businesses. Research in this area is not enough to offer only fragmented perspectives in this area. Therefore, the targeted research problem was designed to investigate how business performance of online B2B purchases can be analyzed. The proposed study focuses on the online procurement in. Specifically, they try to answer questions such as: Does site, product, and vendor characteristics affect the online procurement in? Does online buying experience influence online procurement by? Participants are that use the Internet to procure products or services. Study respondents were SME managers who believe that online procurement will save time, money and effort, reducing costs.

  9. Legal Guarantees of Economic Competition in the European Union Public Procurement Regulation

    Directory of Open Access Journals (Sweden)

    E. Kosiński

    2017-01-01

    that new 2014 EU public procurement directives, viz. Directive 2014/23/ EU, Directive 2014/24/EU and Directive 2014/25/EU, are not really aimed at fostering the competition as the main goal. Nevertheless, a specific and deep analysis of regulation of mentioned directives leads to the conclusion that those directives provide for bigger and broader economic competition. This is achieved generally thanks to opening of the public procurement market for micro, small and medium enterprises (SMBs’ sector. 

  10. Single phase semipolar (11 anti 22) GaN on (10 anti 10) sapphire

    Energy Technology Data Exchange (ETDEWEB)

    Ploch, S.; Stellmach, J.; Schwaner, T.; Frentrup, M.; Wernicke, T.; Pristovsek, M.; Kneissl, M. [Institute of Solid States Physics, (Germany); Park, J.B.; Niermann, T.; Lehmann, M. [Institute of Optics and Atomic Physics, TU Berlin, Hardenbergstr. 36, 10623 Berlin (Germany)

    2011-07-01

    InGaN quantum well based light emitters grown on (0001) GaN suffer from poor quantum efficiencies with increasing indium mole fraction due to strong polarization fields along the polar crystal orientation. This effect can be greatly reduced by growing on semi- and non-polar GaN orientations. Semipolar (11 anti 22) GaN layers were deposited by metalorganic vapour phase epitaxy on (10 anti 10) sapphire. After sapphire substrate nitridation at 1000 C, a GaN nucleation layer was deposited at high temperature, followed by the deposition of 1.5 nm thick GaN buffer layers. The samples show predominantly (11 anti 22) orientation with a small fraction of (10 anti 13) oriented domains. With increasing nitridation layer thickness the (10 anti 13) phase is suppressed leading to a very smooth surface morphology (rms roughness < 4nm). PL measurements show dominant basel plane stacking fault (BSF) I{sub 1} luminescence without any other defects. Transmission electron microscopy measurements reveal a high BSF density. The FWHM of the X-ray diffraction rocking curve measurements of the (1122) reflection decreases to 1193 arcsec and 739 arcsec along [1 anti 100] and [11 anti 23] respectively with increasing nucleation temperature. Using high temperature nucleation smooth and homogeneous (11 anti 22) phase GaN layers have been obtained.

  11. The Green Paper on the modernization of public procurement policy of the EU: Towards a socially-concerned market or towards a market-oriented society?

    Directory of Open Access Journals (Sweden)

    Fernando Losada Fraga

    2012-06-01

    Full Text Available The Green Paper on the modernization of public procurement policy of the European Union launched a reflection on how such EU rules can contribute to fulfill the objectives proposed in the Europe 2020 strategy. This paper analyzes its proposals and identifies its inconsistencies. In particular, it is stressed how European integration has subverted the order of priorities in public procurement rules, upgrading the promotion of the free market to the top of the list. An economistic approach to the legal issue of public procurement seems to be the reason behind such reorganization of priorities. The conflict between political and economic rationalities, which underlies the Green Paper, gives rise to a number of questions, such as how targets other than free competition –mainly the social and environmental ones– shall be taken into account in public procurement; as well as to some proposals, for instance concerning the joint procurement by different administrations (in both the vertical and horizontal sense, and even encouraging a cross-border component, which seems to point to a reorganization of bureaucracy according to economic rationality. The paper, in a final step, aims at describing the (European social model that implicitly underlies these proposals. El Libro Verde sobre la modernización de la política de contratación pública de la Unión Europea propone una reflexión acerca de qué modo las normas comunitarias sobre la materia pueden contribuir a hacer realidad los objetivos propuestos en la estrategia Europa 2020. En este trabajo se analizan las propuestas recogidas en el Libro Verde y se identifican sus incoherencias. En particular se hace hincapié en cómo el proceso de integración europea ha alterado el orden de prioridades de las normas de contratación pública, elevando la promoción del libre mercado a la cúspide de las mismas. La razón de esa reorganización de prioridades parece radicar en la aplicación de un enfoque

  12. 22 CFR 228.23 - Eligibility of marine insurance.

    Science.gov (United States)

    2010-04-01

    ...-Related Services for USAID Financing § 228.23 Eligibility of marine insurance. The eligibility of marine... commodities procured with USAID funds be insured in the United States against marine loss. The decision of any...

  13. PVUSA procurement, acceptance, and rating practices for photovoltaic power plants

    Energy Technology Data Exchange (ETDEWEB)

    Dows, R.N.; Gough, E.J.

    1995-09-01

    This report is one in a series of PVUSA reports on PVUSA experiences and lessons learned at the demonstration sites in Davis and Kerman, California, and from participating utility host sites. During the course of approximately 7 years (1988--1994), 10 PV systems have been installed ranging from 20 kW to 500 kW. Six 20-kW emerging module technology arrays, five on universal project-provided structures and one turnkey concentrator, and four turnkey utility-scale systems (200 to 500 kW) were installed. PVUSA took a very proactive approach in the procurement of these systems. In the absence of established procurement documents, the project team developed a comprehensive set of technical and commercial documents. These have been updated with each successive procurement. Working closely with vendors after the award in a two-way exchange provided designs better suited for utility applications. This report discusses the PVUSA procurement process through testing and acceptance, and rating of PV turnkey systems. Special emphasis is placed on the acceptance testing and rating methodology which completes the procurement process by verifying that PV systems meet contract requirements. Lessons learned and recommendations are provided based on PVUSA experience.

  14. 10 CFR 440.23 - Oversight, training, and technical assistance.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Oversight, training, and technical assistance. 440.23... PERSONS § 440.23 Oversight, training, and technical assistance. (a) The Secretary and the appropriate..., directly or indirectly, training and technical assistance to any grantee or subgrantee. Such training and...

  15. Quality and efficiency of the procurement activities for nuclear program developed within S.N. Nuclearelectrica SA

    International Nuclear Information System (INIS)

    Vatamanu, Mariana; Florescu, Nicolae

    2004-01-01

    General presentation Public procurement is one of the market area where the results of deregulation not fully met the expectations. This suggests that there are necessary immediate measures in order to improve the contract award procedures, taking in consideration the reactions received as response to the Green Paper publication in 1996 'Public procurement in the European Union: Exploring the way forward'. One of the actions imposed by the program of actions that Romania has to fulfill in order to adhere to the European Union, is that related to the harmonization of the Romanian legislation with European legislation. A very important section of activities, which is in area of interest of the European Commission, is that one related to public procurement, for which conditions related to free competition, efficiency of the public funds consumption, equal rights, transparence and confidentiality are imposed. In 2001 a legislation package was issued through which established were the philosophy, general frame and procedures to be implemented in order to ensure that procurement is done in an efficient manner. Procurement activities, in the broad approach, include acquisition of both goods and services, what implies not only purchasing - buying goods - but also hiring of contractors or consultants to carry out services. Procurement is related to the function of supply management, which encompasses aside range of planning function, coding and classification, stockholding policies, store-keeping, stores accounting, etc. The term 'supply management' indicates, on the other hand, that this function is related to procurement of services and activities or hiring of contractors or consultants. The procurement of goods and services in nuclear energy field, have to respect both aspects, legislation issued by government based on UE recommendations, and special regulations and restrictions imposed by regulations applied in nuclear area. This is realized by applying the procedures

  16. Working in the Finance and Procurement Department

    CERN Multimedia

    Laëtitia Pedroso

    2010-01-01

    The CERN Finance and Procurement (FP) Department handles around 35,000 internal purchase orders every year. A large number of them are processed by administrative assistant Sarah Pamelard and her two colleagues Dominique Trolliet and Laurence Fol. As you will see, this is not just any old desk job.   Sarah Pamelard in her office. Sarah Pamelard has worked at CERN for 23 years (see box). She began her career as an assistant in the electronics design office and has been an administrative assistant in the FP Department's purchasing service for the last year and a half. Her work involves processing all internal purchase orders for amounts not exceeding 10,000 CHF. "For each order we have to find the supplier who will provide the best services. Our search covers suppliers in all the Member States to ensure the best possible balance of financial return among them", explains Sarah. The skills that the job demands are not confined to the area of finance. Above all, you need to be very w...

  17. 75 FR 34282 - Federal Acquisition Regulation; FAR Case 2009-014, New Designated Country-Taiwan

    Science.gov (United States)

    2010-06-16

    ... Government Procurement. DATES: Effective Date: June 16, 2010. FOR FURTHER INFORMATION CONTACT: Ms. Lori... Government Procurement. The interim rule added Taiwan to the list of World Trade Organization Government... seq., because, although this rule opens up Government procurement to the goods and services of Taiwan...

  18. On the use of 10-minute point counts and 10-species lists for surveying birds in lowland Atlantic Forests in southeastern Brazil

    Directory of Open Access Journals (Sweden)

    Vagner Cavarzere

    2012-01-01

    Full Text Available Due to rapid and continuous deforestation, recent bird surveys in the Atlantic Forest are following rapid assessment programs to accumulate significant amounts of data during short periods of time. During this study, two surveying methods were used to evaluate which technique rapidly accumulated most species (> 90% of the estimated empirical value at lowland Atlantic Forests in the state of São Paulo, southeastern Brazil. Birds were counted during the 2008-2010 breeding seasons using 10-minute point counts and 10-species lists. Overall, point counting detected as many species as lists (79 vs. 83, respectively, and 88 points (14.7 h detected 90% of the estimated species richness. Forty-one lists were insufficient to detect 90% of all species. However, lists accumulated species faster in a shorter time period, probably due to the nature of the point count method in which species detected while moving between points are not considered. Rapid assessment programs in these forests will rapidly detect more species using 10-species lists. Both methods shared 63% of all forest species, but this may be due to spatial and temporal mismatch between samplings of each method.

  19. Procurement with specialized firms

    NARCIS (Netherlands)

    Boone, Jan; Schottmuller, C.

    2016-01-01

    We analyze optimal procurement mechanisms when firms are specialized. The procurement agency has incomplete information concerning the firms' cost functions and values high quality as well as low price. Lower type firms are cheaper (more expensive) than higher type firms when providing low (high)

  20. Conflicts in Public Procurement

    Directory of Open Access Journals (Sweden)

    Helena Lindskog

    2013-01-01

    Full Text Available During the last couple of years, there has been a tendency to include more and more political goals into public procurements, such as environmental and societal considerations. This can result in higher prices paid by the public sector compared with similar procurements in the private sector. The decision makers at local level are elected and should represent the interest of their communities and voters, which includes promoting regional/local companies and economic development. This task can sometimes get into conflict with public procurement law or the political goals of a central government. (original abstract

  1. Public Procurement of Innovation as Endogenous

    DEFF Research Database (Denmark)

    Rolfstam, Max

    Public procurement used as an innovation policy instrument has attracted attention the last decade. It has been argued that public procurement can be used to stimulate innovation from the demand-side. This paper problematizes ‘demand’ understood as a problem defined by a public procurer given...... to potential suppliers to solve. By drawing on a cross-case analysis of two similar projects the paper attempts to explicate an understanding of the role of public procurement of innovation not primarily as a ‘demand-side innovation instrument’, as such thinking might run the risk of ignoring important...... underlying mechanisms critical for success. Instead the paper views public procurement of innovation as an instrument of endogenous- exogenous knowledge conversion....

  2. 22 CFR 226.46 - Procurement records.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Procurement records. 226.46 Section 226.46 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.46 Procurement records...

  3. 7 CFR 1780.72 - Procurement methods.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...

  4. Procurement with Specialized Firms

    NARCIS (Netherlands)

    Boone, J.; Schottmuller, C.

    2011-01-01

    This paper analyzes optimal procurement mechanisms in a setting where the procurement agency has incomplete information concerning the firms’ cost functions and cares about quality as well as price. Low type firms are cheaper than high type firms in providing low quality but more expensive when

  5. 75 FR 9589 - Agency Information Collection Extension

    Science.gov (United States)

    2010-03-03

    .... Respondents to this information collection request are typically the general public to include private... Energy homepage. DOE Directives, Regulations, and Standards Portal, http://www.directives.doe.gov/forms..., Director, Office of Procurement and Assistance Management, Department of Energy. [FR Doc. 2010-4371 Filed 3...

  6. Forward Commitment Procurement : A practical methodology that helps to manage risk in procuring innovative goods and services

    NARCIS (Netherlands)

    Whyles, G.; Meerveld, H. van; Nauta, N.J.

    2015-01-01

    The Forward Commitment Procurement (FCP) is a Public Procurement of Innovation (PPI) methodology. It was specifically designed to both provide a practical methodology for procurers to follow and to manage the perceived risk of the customer and supplier in innovation investments. The paper describes

  7. public procurement, governance and economic growth

    African Journals Online (AJOL)

    GRACE

    Development (OECD) sees public procurement ―as a strategic policy lever to advance ... financial markets and provision of advisory services to businesses and government. ... Procurement established by the Section 3 of the Act. The BPP is the ... present annual reports to the Minister on the public procurement processes;.

  8. UGC galaxies stronger than 25 mJy at 4.85 GHz

    International Nuclear Information System (INIS)

    Condon, J.J.; Frayer, D.T.; Broderick, J.J.

    1991-01-01

    UGC galaxies in the declination band +5 to +75 deg were identified by position coincidence with radio sources stronger than 25 mJy on the Green Bank 4.85 GHz sky maps. Candidate identifications were confirmed or rejected with the aid of published aperture-synthesis maps and new 4.86 GHz VLA maps having 15 or 18 arcsec resolution, resulting in a sample of 347 nearby radio galaxies plus five new quasar-galaxy pairs. The radio energy sources in UGC galaxies were classified as starbursts or monsters on the basis of their infrared-radio flux ratios, infrared spectral indices, and radio morphologies. The rms scatter in the logarithmic infrared-radio ratio q is not more than 0.16 for starburst galaxies selected at 4.85 GHz. Radio spectral indices were obtained for nearly all of the UGC galaxies, and S0 galaxies account for a disproportionate share of the compact flat-spectrum (alpha less than 0.5) radio sources. The extended radio jets and lobes produced by monsters are preferentially, but not exclusively, aligned within about 30 deg of the optical minor axes of their host galaxies. The tendency toward minor-axis ejection appears to be independent of radio-source size and is strongest for elliptical galaxies. 230 refs

  9. CORRELATES OF PROCUREMENT PERFORMANCE OF ...

    African Journals Online (AJOL)

    Osondu

    2013-02-22

    Feb 22, 2013 ... Purpose of this study is to investigate if procurement challenges, contractual procedures, designer's experience ... Design and Build, Project Management, Direct. Labour and ..... Government Procurement Performance in.

  10. 48 CFR 619.402 - Small Business Administration procurement center representatives.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Small Business... DEPARTMENT OF STATE SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Cooperation with the Small Business Administration 619.402 Small Business Administration procurement center representatives. ...

  11. 32 CFR 37.1330 - Procurement contract.

    Science.gov (United States)

    2010-07-01

    ... REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Definitions of Terms Used in This Part § 37.1330 Procurement contract. A Federal Government procurement contract. It is a legal instrument which, consistent with 31 U.S... 32 National Defense 1 2010-07-01 2010-07-01 false Procurement contract. 37.1330 Section 37.1330...

  12. EU contribution to the procurement of the ITER blanket first wall

    International Nuclear Information System (INIS)

    Lorenzetto, Patrick; Banetta, Stefano; Bellin, Boris; Boireau, Bruno; Bucci, Philippe; Cicero, Tindaro; Conchon, Denis; Dellopoulos, Georges; Hardaker, Stephen; Marshall, Paul; Nogué, Patrice; Pérez, Marcos; Gutierrez, Leticia Ruiz; Samaniego, Fernando; Sherlock, Paul; Zacchia, Francesco

    2016-01-01

    Highlights: • Presentation of the blanket first wall design concept to be procured by Europe. • Presentation of the main outcome of the R&D programme with the resulting FW fabrication route. • Presentation of the ITER first wall pre-qualification programme with the results achieved so far. • Presentation of the on-going irradiation experiments. • Presentation of the EU procurement strategy. - Abstract: Fusion for Energy (F4E), the European Union’s Domestic Agency for ITER, is responsible for the procurement of about 50% of the ITER blanket first wall (FW), called normal heat flux FW. A procurement strategy has been implemented by the In-Vessel Project Team at F4E aimed at mitigating technical and commercial risks for the procurement of ITER blanket FW panels, promoting as far as possible competition among industrial partners. This procurement strategy has been supported by an extensive Research and Development (R&D) programme, implemented over more than 15 years in Europe, to develop various fabrication technologies. It includes in particular the manufacture and testing of small-scale, medium-scale mock-ups and full-scale prototypes of blanket FW panels. In this R&D programme, significant efforts have been devoted to the development of a reliable materials joining technique. Hot Isostatic Pressing was selected for the manufacture of the FW panels made from beryllium, copper–chromium–zirconium alloy and 316L(N)-IG austenitic stainless steel. This paper presents the main outcome of the on-going R&D programme, the latest results of the FW qualification programme together with the procurement strategy implemented by F4E for the supply of the European contribution to the procurement of the ITER blanket FW.

  13. EU contribution to the procurement of the ITER blanket first wall

    Energy Technology Data Exchange (ETDEWEB)

    Lorenzetto, Patrick, E-mail: Patrick.Lorenzetto@f4e.europa.eu [Fusion for Energy, Torres Diagonal Litoral B3, Carrer Josep Plà 2, B-08019 Barcelona (Spain); Banetta, Stefano; Bellin, Boris [Fusion for Energy, Torres Diagonal Litoral B3, Carrer Josep Plà 2, B-08019 Barcelona (Spain); Boireau, Bruno [AREVA NP, Centre Technique, 71200 Le Creusot (France); Bucci, Philippe [Atmostat, rue René Hamon 31, 94815 Villejuif Cedex (France); Cicero, Tindaro [Fusion for Energy, Torres Diagonal Litoral B3, Carrer Josep Plà 2, B-08019 Barcelona (Spain); Conchon, Denis [Atmostat, rue René Hamon 31, 94815 Villejuif Cedex (France); Dellopoulos, Georges [Fusion for Energy, Torres Diagonal Litoral B3, Carrer Josep Plà 2, B-08019 Barcelona (Spain); Hardaker, Stephen [Amec Foster Wheeler plc, Booths Park, Chelford Road, Knutsford WA16 8QZ (United Kingdom); Marshall, Paul [Fusion for Energy, Torres Diagonal Litoral B3, Carrer Josep Plà 2, B-08019 Barcelona (Spain); Nogué, Patrice [AREVA NP, Centre Technique, 71200 Le Creusot (France); Pérez, Marcos [Leading Enterprises SL, Pasaje de La Agüera, 39409 San Felices de Buelna (Spain); Gutierrez, Leticia Ruiz [Iberdrola Ingeniería y Construcción S.A.U., Avenida Manoteras 20, 28050 Madrid (Spain); Samaniego, Fernando [Leading Enterprises SL, Pasaje de La Agüera, 39409 San Felices de Buelna (Spain); Sherlock, Paul [Amec Foster Wheeler plc, Booths Park, Chelford Road, Knutsford WA16 8QZ (United Kingdom); Zacchia, Francesco [Fusion for Energy, Torres Diagonal Litoral B3, Carrer Josep Plà 2, B-08019 Barcelona (Spain)

    2016-11-01

    Highlights: • Presentation of the blanket first wall design concept to be procured by Europe. • Presentation of the main outcome of the R&D programme with the resulting FW fabrication route. • Presentation of the ITER first wall pre-qualification programme with the results achieved so far. • Presentation of the on-going irradiation experiments. • Presentation of the EU procurement strategy. - Abstract: Fusion for Energy (F4E), the European Union’s Domestic Agency for ITER, is responsible for the procurement of about 50% of the ITER blanket first wall (FW), called normal heat flux FW. A procurement strategy has been implemented by the In-Vessel Project Team at F4E aimed at mitigating technical and commercial risks for the procurement of ITER blanket FW panels, promoting as far as possible competition among industrial partners. This procurement strategy has been supported by an extensive Research and Development (R&D) programme, implemented over more than 15 years in Europe, to develop various fabrication technologies. It includes in particular the manufacture and testing of small-scale, medium-scale mock-ups and full-scale prototypes of blanket FW panels. In this R&D programme, significant efforts have been devoted to the development of a reliable materials joining technique. Hot Isostatic Pressing was selected for the manufacture of the FW panels made from beryllium, copper–chromium–zirconium alloy and 316L(N)-IG austenitic stainless steel. This paper presents the main outcome of the on-going R&D programme, the latest results of the FW qualification programme together with the procurement strategy implemented by F4E for the supply of the European contribution to the procurement of the ITER blanket FW.

  14. 75 FR 8392 - Low Income Housing Tax Credit Tenant Database

    Science.gov (United States)

    2010-02-24

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5376-N-11] Low Income Housing Tax Credit Tenant Database AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: The... Lists the Following Information Title Of Proposal: Low Income Housing Tax Credit Tenant Database. Omb...

  15. 7 CFR 225.17 - Procurement standards.

    Science.gov (United States)

    2010-01-01

    ...) Procurements by public sponsors comply with applicable State or local laws and the standards set forth in 7 CFR part 3016; and (2) Procurements by private nonprofit sponsors comply with standards set forth in 7 CFR... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement standards. 225.17 Section 225.17...

  16. 77 FR 71609 - Self-Help Homeownership Opportunity Program (SHOP) Grant Monitoring

    Science.gov (United States)

    2012-12-03

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5603-N-89] Self-Help Homeownership Opportunity Program (SHOP) Grant Monitoring AGENCY: Office of the Chief Information Officer, HUD. ACTION... electronic submission of responses. This notice also lists the following information: Title of Proposed: Self...

  17. The organization of organ procurement.

    Science.gov (United States)

    Prottas, J M

    1989-01-01

    The American organ procurement system has improved and matured in the last five years. At the same time, the basic challenges facing it have remained substantially the same because the moral and legal framework of the system has not changed. Success at organ procurement continues to depend on the voluntary cooperation of medical professionals and the families of potential organ donors. The generosity of the American public is so great that the primary challenge facing organ procurement agencies is obtaining cooperation from hospitals and medical professionals. This calls for a "marketing" orientation aimed at those hospitals and professionals who are most likely to treat potential donors. The last five years have seen a more general acceptance of this appreciation of the central task of organ procurement. As a result, the overall effectiveness of the system has improved, as measured by the number of organs procured on a per capita basis and by the number of multiorgan donors obtained. Much of this improvement can be attributed to the diffusion of organizational techniques and approaches, and this diffusion has been encouraged by the involvement of national organizations and public bodies in the organ procurement community. The system remains uneven in its effectiveness and further improvement is possible. It is also possible that the next general round of improvement will result from the application of businesslike information management and marketing techniques.

  18. 48 CFR 752.225-71 - Local procurement.

    Science.gov (United States)

    2010-10-01

    ... 1997) (a) Local procurement involves the use of appropriated funds to finance the procurement of goods... currency of the cooperating country. (b) All locally-financed procurements must be covered by source/origin...

  19. Multicriteria analysis in public procurement

    Directory of Open Access Journals (Sweden)

    Dejan T. Tošev

    2012-07-01

    Full Text Available The public procurement is one of the most important processes in modern company daily business. The quality of that process and its realization affect the overall company success and reputation. For that purpose, the management is obliged to prepare and carry out the procurement process carefully. The process is based on multicriteria tendering and the purpose of this paper is to present the analytical and hierarchical procurement methods in order to minimize failing in the selection and decision making process.

  20. Procurement management in scientific research and production project

    International Nuclear Information System (INIS)

    Wan Yi

    2008-01-01

    To meet the requirement of development trend of scientific research and production, it is necessary to incorporate the modern procurement management theory in the whole procurement process for the items used in scientific research and production.This paper provided some suggestions to improve the procurement management by introducing the experiences in the application of the modern procurement management methods in the procurement of parts production. (author)

  1. 48 CFR 19.402 - Small Business Administration procurement center representatives.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Small Business... FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Cooperation With the Small Business Administration 19.402 Small Business Administration procurement center representatives. (a)(1) The...

  2. Ethics and regulation in organ procurement research.

    Science.gov (United States)

    Ackerman, Terrence F; Winsett, Rebecca P

    2002-12-01

    This article explores the role of ethics and regulation in human research conducted by organ procurement agencies; basic ethical principles for human research are outlined. Organ procurement agencies are not required to observe federal regulations; however, voluntary adherence will ensure that procurement research is conducted according to current standards of ethical practice. Although most organ procurement research will qualify for exempt status, this determination should be made by an institutional review board. Even if studies qualify for exempt status, there is a moral presumption that informed consent should be sought, unless certain narrow conditions for waiver of consent are satisfied. Finally, when future research utilizing organ procurement records is anticipated, procurement coordinators should provide sufficiently detailed information to families about such plans to permit their advance informed consent to research activities.

  3. Increased IL-10 mRNA and IL-23 mRNA expression in multiple sclerosis: interferon-beta treatment increases IL-10 mRNA expression while reducing IL-23 mRNA expression

    DEFF Research Database (Denmark)

    Krakauer, M.; Sorensen, P.; Khademi, M.

    2008-01-01

    volunteers served to confirm initial findings. mRNA was analyzed by real-time reverse transcriptase polymerase chain reaction (PCR). RESULTS: We found elevated expression of interleukin (IL)-23 and IL-10 in untreated MS patients. IFN-beta therapy increased IL-10 and decreased IL-23 expression independently...... of the regulatory cytokine IL-10. The elevated IL-23 mRNA levels in MS patients are noteworthy in view of the newly discovered IL-23-driven Th17 T-cell subset, which is crucial in animal models of MS. Since IFN-beta therapy resulted in decreased IL-23 mRNA levels, the Th17 axis could be another target of IFN...

  4. Challenges of public procurement in EU funded projects

    Directory of Open Access Journals (Sweden)

    Marko Šostar

    2017-01-01

    Full Text Available Membership in the European Union implies adjustment of EU projects to the rules of Structural Funds, but also adoption of legal regulations, thus influencing the process of implementation of the public procurement in EU funded projects. Each successful applicant who expressed the need for procurement of goods, services and works of a certain value, must respect the principles of public procurement. Irregularities in the procurement process can lead to the failure of returning the EU funds even several years after the end of the project. Therefore, the knowledge and proper implementation of public procurement is the main precondition for the correct implementation of each project. In order to obtain information about the current absorption capacity of the public procurement liable parties, and to identify key obstacles that stakeholders face in procurement procedures, the research was conducted by surveying 30 entities that are subject of public procurement in Croatia. Research results imply the poor quality of public procurement in the implemented projects, which often results in financial corrections, disapproving project reports, etc.

  5. Limits to source counts and cosmic microwave background fluctuations at 10.6 GHz

    International Nuclear Information System (INIS)

    Seielstad, G.A.; Masson, C.R.; Berge, G.L.

    1981-01-01

    We have determined the distribution of deflections due to sky temperature fluctuations at 10.6 GHz. If all the deflections are due to fine structure in the cosmic microwave background, we limit these fluctuations to ΔT/T -4 on an angular scale of 11 arcmin. If, on the other hand, all the deflections are due to confusion among discrete radio sources, the areal density of these sources is calculated for various slopes of the differential source count relationship and for various cutoff flux densities. If, for example, the slope is 2.1 and the cutoff is 10 mJy, we find (0.25--3.3) 10 6 sources sr -1 Jy -1

  6. Evolving Procurement Organizations

    DEFF Research Database (Denmark)

    Bals, Lydia; Laine, Jari; Mugurusi, Godfrey

    Procurement has to find further levers and advance its contribution to corporate goals continuously. This places pressure on its organization in order to facilitate its performance. Therefore, procurement organizations constantly have to evolve in order to match these demands. A conceptual model...... and external contingency factors and having a more detailed look at the structural dimensions chosen, beyond the well-known characteristics of centralization, formalization, participation, specialization, standardization and size. From a theoretical perspective, it opens up insights that can be leveraged...

  7. 2015 Status Report on Major Defence Equipment Procurements

    Directory of Open Access Journals (Sweden)

    David Perry

    2015-12-01

    Full Text Available Federal elections may be good for democracy, but the campaigns — particularly the lengthy one recently held in Canada — can be crippling for plans to better arm our military. Just before the election was called, there were public signs of important progress being made in what has long been a frustratingly slow and bureaucratically complex procurement process. But then the campaign left the Department of National Defence and other federal departments unable to secure approvals from either a defence minister or the Treasury Board, until the election ended and the new prime minister appointed the current cabinet. There had already been upheaval prior to that: In the first seven months of 2015, the three senior leaders at the Canadian Forces and the Defence Department (including the minister had been replaced, along with many other people critical to the procurement process. In addition, there had been changes in the Public Works Department and the Defence Procurement Strategy Secretariat. Frustrating and disappointing delays have long been a matter of course in Canada’s defence procurement process. In 2014/15, the number of ministerial or Treasury Board approvals to allow projects to proceed was half of that in 2009/10. Yet the demand for approvals has not abated. In addition to the turnover of key figures involved in the procurement and approval process, delays have come from a number of major steps added to the process, making an already lengthy and complex system even more so. To be sure, these steps were added in the pursuit of improved financial management and project management, with the aim of addressing longstanding problems. But it will take years to see if those objectives have been realized. An irony here is that the budget for military procurement has increased. Between 2004 and 2009, the Defence Department’s procurement budget nearly doubled. But the funding was never matched by the capacity to manage it. In 2003, the Material

  8. PROMIS (Procurement Management Information System)

    Science.gov (United States)

    1987-01-01

    The PROcurement Management Information System (PROMIS) provides both detailed and summary level information on all procurement actions performed within NASA's procurement offices at Marshall Space Flight Center (MSFC). It provides not only on-line access, but also schedules procurement actions, monitors their progress, and updates Forecast Award Dates. Except for a few computational routines coded in FORTRAN, the majority of the systems is coded in a high level language called NATURAL. A relational Data Base Management System called ADABAS is utilized. Certain fields, called descriptors, are set up on each file to allow the selection of records based on a specified value or range of values. The use of like descriptors on different files serves as the link between the falls, thus producing a relational data base. Twenty related files are currently being maintained on PROMIS.

  9. 14 CFR 23.673 - Primary flight controls.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Primary flight controls. 23.673 Section 23... Control Systems § 23.673 Primary flight controls. Primary flight controls are those used by the pilot for the immediate control of pitch, roll, and yaw. [Doc. No. 4080, 29 FR 17955, Dec. 18, 1964, as amended...

  10. 76 FR 63549 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Miscellaneous Metal and...

    Science.gov (United States)

    2011-10-13

    .... manufacturing operations. 8-2-11 Fabric and vinyl coating. 10/23/1988 3/6/1992, 57 FR 8082. 8-2-12 Wood... transports and 11/5/1999 5/31/2002, 67 FR 38006. vapor collection systems; records. Rule 5. Miscellaneous...

  11. 10C survey of radio sources at 15.7 GHz - II. First results

    Science.gov (United States)

    AMI Consortium; Davies, Mathhew L.; Franzen, Thomas M. O.; Waldram, Elizabeth M.; Grainge, Keith J. B.; Hobson, Michael P.; Hurley-Walker, Natasha; Lasenby, Anthony; Olamaie, Malak; Pooley, Guy G.; Riley, Julia M.; Rodríguez-Gonzálvez, Carmen; Saunders, Richard D. E.; Scaife, Anna M. M.; Schammel, Michel P.; Scott, Paul F.; Shimwell, Timothy W.; Titterington, David J.; Zwart, Jonathan T. L.

    2011-08-01

    In a previous paper (Paper I), the observational, mapping and source-extraction techniques used for the Tenth Cambridge (10C) Survey of Radio Sources were described. Here, the first results from the survey, carried out using the Arcminute Microkelvin Imager Large Array (LA) at an observing frequency of 15.7 GHz, are presented. The survey fields cover an area of ≈27 deg2 to a flux-density completeness of 1 mJy. Results for some deeper areas, covering ≈12 deg2, wholly contained within the total areas and complete to 0.5 mJy, are also presented. The completeness for both areas is estimated to be at least 93 per cent. The 10C survey is the deepest radio survey of any significant extent (≳0.2 deg2) above 1.4 GHz. The 10C source catalogue contains 1897 entries and is available online. The source catalogue has been combined with that of the Ninth Cambridge Survey to calculate the 15.7-GHz source counts. A broken power law is found to provide a good parametrization of the differential count between 0.5 mJy and 1 Jy. The measured source count has been compared with that predicted by de Zotti et al. - the model is found to display good agreement with the data at the highest flux densities. However, over the entire flux-density range of the measured count (0.5 mJy to 1 Jy), the model is found to underpredict the integrated count by ≈30 per cent. Entries from the source catalogue have been matched with those contained in the catalogues of the NRAO VLA Sky Survey and the Faint Images of the Radio Sky at Twenty-cm survey (both of which have observing frequencies of 1.4 GHz). This matching provides evidence for a shift in the typical 1.4-GHz spectral index to 15.7-GHz spectral index of the 15.7-GHz-selected source population with decreasing flux density towards sub-mJy levels - the spectra tend to become less steep. Automated methods for detecting extended sources, developed in Paper I, have been applied to the data; ≈5 per cent of the sources are found to be extended

  12. Risk Management in Public Procurement Process

    Directory of Open Access Journals (Sweden)

    Ioana Manea

    2010-12-01

    Full Text Available Public procurement represents an important part of the current economy reality. Throughout the procurement process, due to the effect of the interaction among the components of the public procurement system, certain actions with significant negative effects on its optimal operation may occur. Risks may turn into certainty either because of a simple error in the development and administration of the procurement process, or because of a deliberate deviation from the existing legal provisions. Therefore, there is an imperative for the implementation of certain risk-avoiding measures, as well as of measures aiming to reduce their negative effects in case of their occurrence.

  13. 50 CFR Figure 10 to Part 223 - Flounder TED

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Flounder TED 10 Figure 10 to Part 223 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE MARINE MAMMALS THREATENED MARINE AND ANADROMOUS SPECIES Pt. 223, Fig. 10 Figure 10 to Part 223—Flounder TED EC01JY91.056 [5...

  14. Absolute measurement of the cross sections of neutron radiative capture for 23Na, Cr, 55Mn, Fe, Ni, 103Rh, Ta, 197Au and 238U in the 10-600keV energy range

    International Nuclear Information System (INIS)

    Le Rigoleur, Claude; Arnaud, Andre; Taste, Jean.

    1976-10-01

    The total energy weighting technique has been applied to measuring absolute neutron capture cross sections for 23 Na, Cr, 55 Mn, Fe, Ni, 103 Rh, Ta, 197 Au, 238 U in the 10-600keV energy range. A non hydrogeneous liquid scintillator was used to detect the gamma from the cascade. The neutron flux was measured with a 10 B INa(Tl) detector or a 6 Li glass scintillator of well known efficiency. The fast time-of-flight technique was used with on line digital computer data processing [fr

  15. Towards the procurement of the ITER divertor

    International Nuclear Information System (INIS)

    Merola, M.; Tivey, R.; Martin, A.; Pick, M.

    2006-01-01

    The procurement of the ITER divertor is planned to start in 2009. On the basis of the present common understanding of the sharing of the ITER components, the Japanese Participating Team (JAPT) will supply the outer vertical target, the Russian Federation (RF) PT the dome liner and will perform the high heat flux testing, the EU PT will supply the inner vertical targets and the cassette bodies, including final assembly of the divertor plasma-facing components (PFCs). The manufacturing of the PFCs of the ITER divertor represents a challenging endeavor due to the high technologies which are involved, and due to the unprecedented series production. To mitigate the associated risks, special arrangements need to be put in place prior to and during procurement to ensure quality and to keep to the time schedule. Before procurement can start, an ITER review of the qualification and production capability of each candidate PT is planned. Well in advance of the assumed start of the procurement, each PT which would like to contribute to the divertor PFC procurement, should first demonstrate its technical qualification to carry out the procurement with the required quality, and in an efficient and timely manner. Appropriate precautions, like subdivision of the procurement into stages, are also to be adopted during the procurement phase to mitigate the consequences of possible unexpected manufacturing problems. In preparation for writing the procurement specification for the vertical targets, the topic of setting acceptance criteria is also being addressed. This activity has the objective of defining workable acceptance criteria for the PFC armour joints. A complete set of analyses is also in progress to assess the latest design modifications against the design requirements. This task includes neutronic, shielding, thermo-mechanical and electromagnetic analyses. More than half of the ITER plasma parameters that must be measured and the related diagnostics are located in the

  16. 77 FR 64567 - Product List Change

    Science.gov (United States)

    2012-10-22

    ... Delivery service from the competitive product list due to low customer demand.\\2\\ It states that there are... POSTAL REGULATORY COMMISSION [Docket No. MC2013-3; Order No. 1503] Product List Change AGENCY... product list. This notice provides public notice of the Postal Service's filing, invites public comment...

  17. 77 FR 26795 - Product List Changes

    Science.gov (United States)

    2012-05-07

    ... the United States Postal Service to Transfer Parcel Post to the Competitive Product List, April 26... Service request to remove Parcel Post from the market dominant product list and to add a nearly identical ``Parcel Post'' to the competitive product list. Alaska Bypass Service would remain on the market dominant...

  18. Donor conversion and procurement failure: the fate of our potential organ donors.

    Science.gov (United States)

    Branco, Bernardino C; Inaba, Kenji; Lam, Lydia; Salim, Ali; Barmparas, Galinos; Teixeira, Pedro G R; Talving, Peep; Demetriades, Demetrios

    2011-02-01

    Donor availability remains the primary limiting factor for organ transplantation today. The purpose of this study was to examine the causes of procurement failure amongst potential organ donors. After Institutional Review Board approval, all surgical intensive care unit (SICU) patients admitted to the LAC+USC Medical Center from 01/2006 to 12/2008 who became potential organ donors were identified. Demographics, clinical data, and procurement data were abstracted. In non-donors, the causes of procurement failure were documented. During the 3-year study period, a total of 254 patients were evaluated for organ donation. Mean age was 44.8±18.7 years; 191 (75.2%) were male, 136 (53.5%) were Hispanic, and 148 (58.3%) were trauma patients. Of the 254 patients, 116 (45.7%) were not eligible for donation: 34 had multi-system organ failure, 24 did not progress to brain death and had support withdrawn, 18 had uncontrolled sepsis, 15 had malignancy, 6 had human immunodeficiency virus or hepatitis B or C, and 19 patients had other contraindications to organ donation. Of the remaining 138 eligible patients, 83 (60.2%) did not donate: 56 because the family denied consent, 9 by their own choice. In six, next of kin could not be located, five died because of hemodynamic instability before organ procurement was possible, four had organs that could not be placed, and three had their organs declined by the organ procurement organization. The overall consent rate was 57.5% (n=67). From the 55 donors, 255 organs were procured (yield 4.6 organs/donor). Of all patients screened for organ donation, only a fifth actually donated. Denial of consent was the major potentially preventable cause of procurement failure, whereas hemodynamic instability accounted for only a small percentage of donor losses. With such low conversion rates, the preventable causes of procurement failure warrant further study.

  19. 78 FR 37694 - Federal Acquisition Regulation; Deletion of Report to Congress on Foreign-Manufactured Products

    Science.gov (United States)

    2013-06-21

    ... U.S.C. chapter 35). List of Subject in 48 CFR Part 25 Government procurement. Dated: June 13, 2013...: July 22, 2013. FOR FURTHER INFORMATION CONTACT: Ms. Cecelia L. Davis, Procurement Analyst, at 202-219... report to Congress is no longer required but the collection of the data in the Federal Procurement Data...

  20. Cost containment through pharmaceutical procurement: a Caribbean case study.

    Science.gov (United States)

    Huff-Rousselle, M; Burnett, F

    1996-01-01

    This article discusses the potential for health sector cost containment in developing countries through improved pharmaceutical procurement. By describing the specific example of the Eastern Caribbean Drug Service (ECDS), which provides a pooled procurement service to nine ministries of health in the small island nations of the Caribbean, it examines the elements of the procurement operation that allowed ECDS to reduce unit costs for pharmaceuticals by over 50 per cent during its first procurement cycle. The analysis of ECDS considers: (1) political will, institutional alliances, and the creation of a public sector monopsony; (2) pooling demand; (3) restricted international tendering and the pharmaceutical industry; (4) estimating demand and supplier guarantees; (5) reducing variety and increasing volume through standardizing pack sizes, dosage forms and strengths; (6) generic bidding and therapeutic alternative bidding; (7) mode of transport from foreign suppliers; (8) financing mechanisms, including choice of currency, foreign exchange, and terms of payment; (9) market conditions and crafting and enforcing supplier contracts; and, (10) the adjudication process, including consideration of suppliers' past performance, precision requirements in the manufacturing process, number of products awarded to suppliers, and issues of judgment. The authors consider the relevance of this agency's experience to other developing countries by providing a blueprint that can be adopted or modified to suit other situations.

  1. Factors influencing global antiretroviral procurement prices.

    Science.gov (United States)

    Wirtz, Veronika J; Forsythe, Steven; Valencia-Mendoza, Atanacio; Bautista-Arredondo, Sergio

    2009-11-18

    Antiretroviral medicines (ARVs) are one of the most costly parts of HIV/AIDS treatment. Many countries are struggling to provide universal access to ARVs for all people living with HIV and AIDS. Although substantial price reductions of ARVs have occurred, especially between 2002 and 2008, achieving sustainable access for the next several decades remains a major challenge for most low- and middle-income countries. The objectives of the present study were twofold: first, to analyze global ARV prices between 2005 and 2008 and associated factors, particularly procurement methods and key donor policies on ARV procurement efficiency; second, to discuss the options of procurement processes and policies that should be considered when implementing or reforming access to ARV programs. An ARV-medicines price-analysis was carried out using the Global Price Reporting Mechanism from the World Health Organization. For a selection of 12 ARVs, global median prices and price variation were calculated. Linear regression models for each ARV were used to identify factors that were associated with lower procurement prices. Logistic regression models were used to identify the characteristics of those countries which procure below the highest and lowest direct manufactured costs. Three key factors appear to have an influence on a country's ARV prices: (a) whether the product is generic or not; (b) the socioeconomic status of the country; (c) whether the country is a member of the Clinton HIV/AIDS Initiative. Factors which did not influence procurement below the highest direct manufactured costs were HIV prevalence, procurement volume, whether the country belongs to the least developed countries or a focus country of the United States President's Emergency Plan For AIDS Relief. One of the principal mechanisms that can help to lower prices for ARV over the next several decades is increasing procurement efficiency. Benchmarking prices could be one useful tool to achieve this.

  2. Transformation of fraud activities in procurement system in Indonesia

    Science.gov (United States)

    Setiani, N.; Huda, S. N.; Pulungan, R.; Winarko, E.

    2017-03-01

    E-procurement has been applied in Indonesia since 2008 through the adoption of Electronic Procurement System (SPSE). The purpose of the use of SPSE in the procurement process is to improve the efficiency of goods or services procurement. In the bidding process, intensive communication and data exchange between providers and organizers are urgently needed. Through SPSE, the frequency of face to face meetings between providers and the committee can be reduced. This is expected to minimize potential fraud behaviors in the goods or services procurement conducted through the tender process. There exists a transformation of activities in the procurement through SPSE from the tender process that was previously done manually. In this paper, we analyze this transformation between manual procurement process and SPSE-based procurement process. The result of the analysis is exploited for investigating the possibility of fraud behavior transformations in every phase of e-procurement activities.

  3. Procurement Options for New Renewable Electricity Supply

    Energy Technology Data Exchange (ETDEWEB)

    Kreycik, C. E.; Couture, T. D.; Cory, K. S.

    2011-12-01

    State renewable portfolio standard (RPS) policies require utilities and load-serving entities (LSEs) to procure renewable energy generation. Utility procurement options may be a function of state policy and regulatory preferences, and in some cases, may be dictated by legislative authority. Utilities and LSEs commonly use competitive solicitations or bilateral contracting to procure renewable energy supply to meet RPS mandates. However, policymakers and regulators in several states are beginning to explore the use of alternatives, namely feed-in tariffs (FITs) and auctions to procure renewable energy supply. This report evaluates four procurement strategies (competitive solicitations, bilateral contracting, FITs, and auctions) against four main criteria: (1) pricing; (2) complexity and efficiency of the procurement process; (3) impacts on developers access to markets; and (4) ability to complement utility decision-making processes. These criteria were chosen because they take into account the perspective of each group of stakeholders: ratepayers, regulators, utilities, investors, and developers.

  4. Mexico - The Federal Procurement System : Challenges and Opportunities

    OpenAIRE

    World Bank

    2007-01-01

    The World Bank carried out the first country procurement assessment review (CPAR) jointly with the Government in 2001, focusing on the features and performance of the federal procurement system. Based on the action plan included in the 2001 CPAR, the government reformed federal procurement laws and regulations in 2005 and furthered the development of Government Procurement Electronic Syste...

  5. Interactivity of marketing and procurement

    Directory of Open Access Journals (Sweden)

    Lazarević Dragan

    2007-01-01

    Full Text Available General conclusions regarding the close links between marketing and procurement side of the marketing process would be expressed as follows: Interactive link between marketing and procurement is just proportionate to a level of company's market orientation. Establishment of an interactive link between marketing and procurement fields would reflect on pricing. Besides price competition, establishment of an integral approach through comprehensive understanding of market relations, will set up conditions for company to meet customers' needs in the most optimal way. Therefore the total result will be advanced and a company with this kind of orientation can become a market leader.

  6. Decentralized Procurement in Light of Strategic Inventories

    DEFF Research Database (Denmark)

    Frimor, Hans; Arya, Anil; Mittendorf, Brian

    2015-01-01

    The centralization versus decentralization choice is perhaps the quintessential organizational structure decision. In the operations realm, this choice is particularly critical when it comes to the procurement function. Why firms may opt to decentralize procurement has been often studied and conf......The centralization versus decentralization choice is perhaps the quintessential organizational structure decision. In the operations realm, this choice is particularly critical when it comes to the procurement function. Why firms may opt to decentralize procurement has been often studied...... and confirmed to be a multifaceted choice. This paper complements existing studies by detailing the trade-offs in the centralization versus decentralization decision in light of firm's decision to cede procurement choices to its individual devisions can help moderate inventory levels and provide a natural salve...

  7. The World Bank Group and Public Procurement--An Independent Evaluation : Volume 2: Achieving Development Effectiveness through Procurement in Bank Financial Assistance

    OpenAIRE

    Independent Evaluation Group

    2014-01-01

    Good public procurement practices are a major determinant of the effectiveness of public expenditure. On behalf of their citizens, governments typically spend as much as 5-20 percent of their gross domestic product on procurement of goods and services, and effective procurement policies enable better use of government budgets. Good national procurement practices are therefore an essential ...

  8. 10 CFR 710.23 - Extensions of time by the Manager.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Extensions of time by the Manager. 710.23 Section 710.23... the Manager. The Manager may, for good cause shown, at the written request of the individual, extend... the matters contained in the notification letter. The Manager shall notify the Director, Office of...

  9. 7 CFR 210.21 - Procurement.

    Science.gov (United States)

    2010-01-01

    ... Responsibilities § 210.21 Procurement. (a) General. State agencies and school food authorities shall comply with... violation of law are to be referred to the local, State, or Federal authority that has proper jurisdiction... title are followed. A school food authority may use its own procurement procedures which reflect...

  10. Measuring effects of public procurement of innovation

    DEFF Research Database (Denmark)

    Rolfstam, Max

    Underway for quite some time now has been the discussion on using public procurement as a means to stimulate innovation. However - with some exceptions this has been mainly a conceptual discussion vastly surpassed a corresponding development of appropriate monitoring tools. Also, even if both...... qualitative and quantitative studies have been made, they tend to lack connection to the underlying mechanisms envisaged in the conceptual and/or case based literature. A challenge in this endeavour prevails in the nature of how public procurement of innovation works. Some of the effects rendered may...... about the usefulness of public procurement of innovation are at all realistic and feasible in practice. After reviewing different currently available means to measure both public procurement of innovation measures, as well as public procurement of innovation, the paper outlines a case-based approach...

  11. The Informing Needs of Procurement Officers in Israel

    Directory of Open Access Journals (Sweden)

    Yahel Giat

    2017-06-01

    Full Text Available Aim/Purpose: To develop and introduce a questionnaire that investigates the informing needs, information-seeking behavior, and supplier selection of procurement officers in Israel. The questionnaire’s internal consistency reliability is given. Additionally, we describe the demographic description of the procurement officers in Israel. Background: Procurement science is an important field that affects firms’ profits in the private sector and is significant to growth, innovation, sustainability, and welfare in the public sector. There is little research about the informing needs of procurement officers in general and particularly in Israel. Methodology: A quantitative questionnaire that is sent to all the procurement officers in Israel’s procuring association. Contribution: The questionnaire that is developed in this paper may be used by other researchers and practitioners to evaluate the information needs of procurement officers. Findings: The typical procurement officer is male, with a bachelor degree and is digitally proficient. Recommendations for Practitioners: The procuring side can use the questionnaire to develop better tools for obtaining information efficiently. The supplying side can use this knowledge to improve its exposure to potential customers and address its customer’s needs better. Recommendation for Researchers: The questionnaire can address theoretical questions such as how digital literacy affects the procuring process and provide empirical findings about active research areas such as supplier selection and information-seeking behavior. Future Research: Future research will examine the relationship between the various variables and demographic features to understand why specific information needs and information-seeking behaviors arise.

  12. Determinación del requerimiento de frío y de calor en duraznero [Prunus persica (L. Batsch.] mediante un modelo de correlación

    Directory of Open Access Journals (Sweden)

    CHAAR, J

    2012-11-01

    Full Text Available Los árboles frutales de hoja no persistente poseen un período de reposo entre los ciclos vegetativos. Para salir de reposo invernal, las yemas deben acumular primero frío (endodormancia y luego calor (ecodormancia.El objetivo de este trabajo fue determinar el requerimiento de frío y de calor en cinco cultivares de duraznero mediante un método de correlación, con datos de fecha de plena floración y temperatura del aire de siete años, en el este de Mendoza. El requerimiento de frío varió entre 914 y 1262 unidades de frío, mientras que el de calor fluctuó entre 2177 y 6490 horas grado de crecimiento. Excepto en cv. “Prima”, la variabilidad entre años del requerimiento de frío (coeficiente de variación, CV: 18,3 a 18,9% fue mayor que la correspondiente al requerimiento de calor, (CV: 6,9 a 13,9%. Los requerimientos de calor disminuyeron en años de mayor acumulación de frío e indicaron una compensación. El modelo utilizado, permite disponer de información más precisa sobre los requerimientos térmicos de los cultivares, y así poder realizar una zonificación que racionaliceel cultivo y maximice su aprovechamiento, en las áreas agroclimáticamente adecuadas.

  13. EIA and green procurement: Opportunities for strengthening their coordination

    International Nuclear Information System (INIS)

    Uttam, Kedar; Faith-Ell, Charlotta; Balfors, Berit

    2012-01-01

    EIA plays an important role in enhancing the environmental performance of the construction sector. In recent years, the construction sector has been developing green procurement practices. Green procurement is a process that involves the incorporation of environmental requirements during the procurement of services and products. However, discussion on green procurement is rarely seen during the EIA phase. This paper addresses possible opportunities for improving the coordination between EIA and green procurement within the construction sector. The linking of EIA and green procurement has been postulated in the paper as an aid to strengthen the coordination between project planning and implementation. The paper is based on a literature review and is an outcome of an on-going research project concerning EIA and green procurement. This study indicated that it would be appropriate to introduce green procurement during the pre-decision phase of an EIA. In the present study, the opportunities for integrating green procurement at the stage of EIA are associated with the integration of project planning and EIA. Future research should investigate the mechanism through which the link can be established. - Highlights: ► This paper identifies opportunities to link EIA and green procurement. ► Pre-decision phase of EIA could be appropriate for planning green procurement. ► Future research should investigate the mechanism for establishing the link.

  14. EIA and green procurement: Opportunities for strengthening their coordination

    Energy Technology Data Exchange (ETDEWEB)

    Uttam, Kedar, E-mail: kedar@kth.se [Department of Land and Water Resources Engineering, Royal Institute of Technology, Stockholm (Sweden); Faith-Ell, Charlotta, E-mail: charlotta.faith-ell@WSPGroup.se [WSP Sweden (Sweden); Balfors, Berit, E-mail: balfors@kth.se [Department of Land and Water Resources Engineering, Royal Institute of Technology, Stockholm (Sweden)

    2012-02-15

    EIA plays an important role in enhancing the environmental performance of the construction sector. In recent years, the construction sector has been developing green procurement practices. Green procurement is a process that involves the incorporation of environmental requirements during the procurement of services and products. However, discussion on green procurement is rarely seen during the EIA phase. This paper addresses possible opportunities for improving the coordination between EIA and green procurement within the construction sector. The linking of EIA and green procurement has been postulated in the paper as an aid to strengthen the coordination between project planning and implementation. The paper is based on a literature review and is an outcome of an on-going research project concerning EIA and green procurement. This study indicated that it would be appropriate to introduce green procurement during the pre-decision phase of an EIA. In the present study, the opportunities for integrating green procurement at the stage of EIA are associated with the integration of project planning and EIA. Future research should investigate the mechanism through which the link can be established. - Highlights: Black-Right-Pointing-Pointer This paper identifies opportunities to link EIA and green procurement. Black-Right-Pointing-Pointer Pre-decision phase of EIA could be appropriate for planning green procurement. Black-Right-Pointing-Pointer Future research should investigate the mechanism for establishing the link.

  15. Tanzania : Country Procurement Assessment Report, Executive Summary

    OpenAIRE

    World Bank

    2004-01-01

    This Country Procurement Assessment Report (CPAR)intends to determine the compatibility of national procurement law, and practices, with the principles of economy, and with international procurement practices. This CPAR, the second of its kind in Tanzania, looks at the legislative framework, the performance of regulatory functions, the enforcement regime, and the capacity of public sector ...

  16. Donor selection criteria and procurement

    International Nuclear Information System (INIS)

    Agcaoili, N.R.

    1999-01-01

    Donor selection is one of the most important aspects of tissue banking practice. Without a good donor selection criteria, the results of any effort of trying to preserve tissues will have disastrous outcome for the recipient of these tissues. While with a very good and strict donor selection the Tissue Bank can guarantee safe and effective tissue allografts. There are significant aspects in the history and physical examination of the donor that must be emphasized. A donor exclusion criteria has also been formulated together with a list of all the needed laboratory examinations to eliminate possible diseases that may be transferred from the donor. The methods of procurement of tissue allografts from living and cadaver donors will be described. The limitations and advantages of each will be taken.There are also special restrictions that are important in the practice of removing the tissues from the donors. All the necessary equipment should be ready and the potential risk on the personnel should be known to all doing Tissue Banking

  17. An evaluation of transit procurement training.

    Science.gov (United States)

    Noland, Robert B; Weiner, Marc D; Klein, Nicholas J; Puniello, Orin D

    2017-04-01

    We evaluated a training course called "Orientation to Transit Procurement", designed and conducted by the National Transit Institute. This course is designed to provide Federal Transit Administration (FTA) grantees an overview of regulations and best practices related to the procurement process. Our objective in conducting the evaluation was to understand how transit agency staff made changes in procurement practices in response to the course training. The evaluation was mixed mode: an Internet survey followed by in-depth interviews with a small group of respondents. Survey respondents were also provided with an open-ended question providing us with additional context for our evaluation. Results show that the training is substantially successful at meeting the goal of improving procurement practices at transit agencies; indeed, most respondents report making changes at their agencies as the proximate result of the training. This was at odds with our exploration of knowledge of procurement topics, as most respondents gave inaccurate answers on multiple-choice "knowledge questions". This may have been due to question structure or, more likely, the nature of online surveys. Suitable training on the procurement of information technology was also a main concern. The lack of training in this area is indicative of the broader challenge facing public transit agencies in how to incorporate new forms of technology into their existing practices and bureaucratic structures. Copyright © 2016 Elsevier Ltd. All rights reserved.

  18. The Malaysian Public Procurement's Prevalent System and its Weaknesses

    OpenAIRE

    Rohana Othman; Husein Zakaria; Norlaili Nordin; Zamzam Shahidan; Kamaruzaman Jusoff

    2010-01-01

    Problem statement: This study examined the public procurement system as prevalent in the Malaysian government system of administration. Various aspects of public procurement are outlined including types and the processes that entail public procurement. This study also highlighted the weaknesses in the manual public procurement processes that are opened to potential abuse and mismanagement resulting in corruption. This study places the Malaysian Government public procurement system under the s...

  19. Application of Life Support Cost, Provisioning, and Repair/Discard Models to Weapon System Procurement Decisions by Small Countries.

    Science.gov (United States)

    1981-12-01

    the LCC for use in system evaluation was motivated by the fact that the major part of user budgets are spent on operations and support activities...Furthermore, it was recognized that these ownership costs ex- ceed systems procurement costs by up to several times. The main motivation behind the LCC...8217 󈧄 4 ~ ~ ~ ( CL f %AO 09*. 𔃾.𔃺 𔄃 0 4 . -~4 4C4 - CL44 N 10 z3 w 4 . - 4)..LIP 4 .J~272 .0co A pF 1 PS4 ~~~~m a0~-eN ON~ - .q r N0 .. ~ ~ 7O N#04

  20. 2018-04-23T10:43:04Z https://www.ajol.info/index.php/all/oai oai:ojs ...

    African Journals Online (AJOL)

    article/36049 2018-04-23T10:43:04Z ijonas:ART Occurrence of parasitic helminths among free-range pigs in five Local Government Areas of Owerri zone, Imo State, Nigeria Opara, MN Ibekwe, N Azubuike, JC Okoli, CG A study of helminth ...

  1. 16 CFR 1.23 - Quantity limit rules.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Quantity limit rules. 1.23 Section 1.23 Commercial Practices FEDERAL TRADE COMMISSION ORGANIZATION, PROCEDURES AND RULES OF PRACTICE GENERAL... Robinson-Patman Act. These rules have the force and effect of law. [32 FR 8444, June 13, 1967. Redesignated...

  2. Integrated Procurement Management System, Version II

    Science.gov (United States)

    Collier, L. J.

    1985-01-01

    Integrated Procurement Management System, Version II (IPMS II) is online/ batch system for collecting developing, managing and disseminating procurementrelated data at NASA Johnson Space Center. Portions of IPMS II adaptable to other procurement situations.

  3. 75 FR 13130 - General Services Administration Acquisition Regulation; Submission for OMB Review; Submission and...

    Science.gov (United States)

    2010-03-18

    ... Authorized FSS Schedule Price Lists, Contract Price Lists, and Dissemination of Information by Contractor... Distribution of Authorized FSS Schedule Price Lists, Contract Price Lists, and Dissemination of Information by..., Procurement Analyst, Contract Policy Branch, at telephone (202) 501-1900 or via e- mail at warren.blankenship...

  4. Corporate social responsibility and public procurement: How supplying government affects managerial orientations

    OpenAIRE

    Snider, Keith F.; Halpern, Barton H.; Rendon, Rene G.; Kidalov, Max V.

    2013-01-01

    The article of record as published may be located at http://dx.doi.org/10.1016/j.pursup.2013.01.001 How does government drive the corporate social responsibility of firms that supply it with goods and services? This paper reviews relevant theory and practice to describe ways in which public procurement shapes corporate social responsibility, and it builds upon theory to develop testable propositions to describe these influences. Using the case of U.S. defense procurement, statisti...

  5. International public procurement: From scant facts to hard data

    OpenAIRE

    Cernat, Lucian; Kutlina-Dimitrova, Zornitsa

    2015-01-01

    Public procurement is a negotiating area gaining in importance at multilateral and bilateral level, as evidenced by a brief review of procurement provisions in existing trade agreements. The size of procurement spending stands in most developed economies at double-digit percentage points of GDP. However, despite the size and importance of these markets, the factual information available to trade negotiators remains scarce. Although public procurement patterns (e.g. size of procurement markets...

  6. 75 FR 76961 - Procurement List; Proposed Additions and Deletions

    Science.gov (United States)

    2010-12-10

    ... Support, Philadelphia, PA. Wind Jacket--Layer IV, ECWCS Gen III, Universal Camouflage NSN: 8415-01-546-8657--Size X-Small-Short. NSN: 8415-01-546-8667--Size X-Small-Regular. NSN: 8415-01-546-8745--Size...--Size Large-Regular. NSN: 8415-01-538-6080--Size Large-Long. NSN: 8415-01-538-6681--Size X-Large-Regular...

  7. 76 FR 62391 - Procurement List; Proposed Additions and Deletions

    Science.gov (United States)

    2011-10-07

    ... Investigation, Washington, DC Service Type/Location: Laundry Service, Stratton Medical Center, 113 Holland Ave... persons who are blind or have other severe disabilities, and deletes services previously furnished by such... entities to furnish the services to the Government. 3. There are no known regulatory alternatives which...

  8. 78 FR 4133 - Procurement List; Proposed Additions and Deletion

    Science.gov (United States)

    2013-01-18

    ... specific tasks including preparation of menu boards, table bussing service, guest flow rate, service of food, replenishing of food, unloading, storing, and shelving of supplies, food preparation, cashier... the event of contingency, perform all required tasks to include cooking to ensure continued service...

  9. 77 FR 5495 - Procurement List Proposed Additions and Deletions

    Science.gov (United States)

    2012-02-03

    ... cleaning and sanitation of facilities and equipment, washing of tableware, pots, pans, and all cooking utensils, subsistence and material handling, quality control, limited food preparation for salad bar and ground support/flight meals, serving and replenishing food, condiments and table items. Two weekends per...

  10. 77 FR 75616 - Procurement List; Proposed Additions And Deletion

    Science.gov (United States)

    2012-12-21

    ... . SUPPLEMENTARY INFORMATION: This notice is published pursuant to 41 U.S.C. 8503(a)(2) and 41 CFR 51-2.3. Its...: Products NSN: 7420-00-NIB-0023--Talking Calculator, 508 Compliant, 12 Digit, Portable, Desktop, Battery...

  11. 78 FR 13868 - Procurement List Proposed Additions and Deletions

    Science.gov (United States)

    2013-03-01

    ... . SUPPLEMENTARY INFORMATION: This notice is published pursuant to 41 U.S.C. 8503(a)(2) and 41 CFR 51-2.3. Its...: Products Portable Desktop Clipboard, 9\\1/2\\'' W x 1\\1/2\\'' D x 13\\1/2\\'' H NSN: 7510-00-NIB-2133--Black NSN...

  12. 75 FR 31768 - Procurement List Proposed Additions and Deletions

    Science.gov (United States)

    2010-06-04

    .... Service Type/Location: Mailroom/Courier Services, San Juan Customhouse Building, 1 La Puntilla Street, San.../Location: Recycling Services, Kennedy Space Center, NASA Mail Code: OP-ES, Kennedy Space Center, FL. NPA...

  13. 75 FR 41451 - Procurement List; Proposed Additions and Deletion

    Science.gov (United States)

    2010-07-16

    .../Location: Contact Center Service, Office of the Comptroller of the Currency--Financial Management...., Lansing, MI. Contracting Activity: U.S. Department of Treasury, Office of the Comptroller of the Currency--Financial Management, Washington, DC. Service Type/Location: Transcription Service, U.S. Army War College...

  14. 75 FR 18164 - Procurement List: Proposed Additions and Deletions

    Science.gov (United States)

    2010-04-09

    ... . SUPPLEMENTARY INFORMATION: This notice is published pursuant to 41 U.S.C. 47(a)(2) and 41 CFR 51-2.3. Its.../Location: Janitorial Services, Corp of Engineers Buildings, Elmendorf AFB, AK, Corp of Engineers Buildings, Fort Richardson, AK. NPA: MQC Enterprises, Inc., Anchorage, AK. Contracting Activity: XR W2SN ENDIST...

  15. 78 FR 21916 - Procurement List; Proposed Additions and Deletions

    Science.gov (United States)

    2013-04-12

    ...: Blind Industries & Services of Maryland, Baltimore, MD Contracting Activity: W40M Natl Region Contract OFC, Fort Belvoir, VA NSN: 7930-00-664-6910--Glass Cleaner, Bio-based, Heavy Duty, 8 oz. NPA...

  16. 78 FR 75911 - Procurement List; Proposed Additions and Deletions

    Science.gov (United States)

    2013-12-13

    ... persons who are blind or have other severe disabilities and to delete products and a service previously...: General Services Administration, New York, NY NSN: 8955-01-E61-3689--Coffee, Roasted, Ground, 39 oz. bag...

  17. 78 FR 54871 - Procurement List; Proposed Additions and Deletion

    Science.gov (United States)

    2013-09-06

    ...: GENERAL SERVICES ADMINISTRATION, NEW YORK, NY Holiday Themed Bags, Containers and Baking Cup-Picks Set NSN... 16 oz., 6PK NSN: MR 380--Set, Baking Cups and Picks, Holiday, 24PC NPA: Winston-Salem Industries for... General Services Administration NSN: 7520-00-NIB-0358--Kit, Mounting Board, GHS Information Center NSN...

  18. 78 FR 20620 - Procurement List; Additions to and Deletions

    Science.gov (United States)

    2013-04-05

    ... ADMINISTRATION, FORT WORTH, TX NSN: 8465-00-860-0256--Cover, Water Canteen NPA: Human Technologies Corporation... for the Blind and Vision Impaired, Lancaster, PA Contracting Activity: DEPARTMENT OF VETERANS AFFAIRS... Maintenance Service, Yakima Training Center and Multipurpose Range Complex, Multipurpose Training Range...

  19. 77 FR 9631 - Procurement List; Proposed Additions and Deletions

    Science.gov (United States)

    2012-02-17

    .../Location: Janitorial/Custodial, U.S. Federal Building, First and Water Street, Alpena, MI. NPA: Northeastern Michigan Rehabilitation and Opportunity Center (NEMROC), Alpena, MI. Contracting Activity: General...

  20. 78 FR 63967 - Procurement List; Proposed Addition and Deletions

    Science.gov (United States)

    2013-10-25

    ... Service Type/Location: Integrated Prime Vendor, Supply Chain Management Service (inventory control...: Integrated Prime Vendor Supply Chain Management Service (to support production, assembly, receipt, storage...) Modules and Modification System Cold Weather), US Army, Product Manager Force Sustainment Systems, Natick...

  1. 76 FR 43990 - Procurement List; Proposed Additions and Deletions

    Science.gov (United States)

    2011-07-22

    ... Distribution. In 2010, the Defense Distribution Center (DDC) was renamed DLA Distribution. A process was also..., each distribution center that was part of the former DDC will be renamed as DLA Distribution, plus its...

  2. 76 FR 21336 - Procurement List; Proposed Additions and Deletions

    Science.gov (United States)

    2011-04-15

    ... Research, Development, & Engineering Command, Natick, MA. Self-stick, Repositionable Flags NSN: 7510-01-315..., NAVFAC ENGINEERING COMMAND HAWAII, PEARL HARBOR, HI. Service Type/Location: Facility Maintenance, US... ADMINISTRATION, NEW YORK, NY. Slacks, Woman's, Navy--Tropical Blue NSN: 8410-01-377-9373. NPAs: Knox County...

  3. 76 FR 13362 - Procurement List Proposed Additions and Deletion

    Science.gov (United States)

    2011-03-11

    .../Location: Base Supply Center, Rock Island Arsenal, 3154 Rodman Avenue, Rock Island, IL. NPA: Association for Retarded Citizens of Rock Island County, Rock Island, IL. Contracting Activity: DEPT OF THE ARMY, SR W0K8 USA ROCK ISL ARSENAL, ROCK ISLAND, IL. Service Type/Location: Base Operations Support, Mark...

  4. 76 FR 20956 - Endangered and Threatened Species; Take of Anadromous Fish

    Science.gov (United States)

    2011-04-14

    ... and Threatened Species; Take of Anadromous Fish AGENCY: National Marine Fisheries Service (NMFS... regulations promulgated for salmon and steelhead listed under the Endangered Species Act (ESA). The FMEP... July 10, 2000, Endangered Species Act (ESA) 4(d) rule for salmon and steelhead (65 FR 42422) and...

  5. Risk Factors Influencing Construction Procurement Performance in Nigeria

    Directory of Open Access Journals (Sweden)

    Alhassan Dahiru

    2015-08-01

    Full Text Available One of the challenges facing construction procurement performance is the failure to determine the risk related factors limiting its success. These risk factors can cause a significant increase in the procurement cost leading to an increase in the overall project cost. The purpose of this study is to identify and evaluate the risk factors influencing construction procurement performance with a view to achieve the overall project performance. The objectives are to establish a relative significance index score for the most important risk factors limiting the procurement performance of the projects. A self administered questionnaire was employed to the construction industry professionals for responses. A total of 78 questionnaires were distributed to these professionals (architects, quantity surveyors, engineers, and contractors but 62 were returned and analyzed using influential index and later ranked in order of importance. Results of the analysis indicate a disparity in terms of ranking of the factors influencing construction procurement performance. Corruption related risk, conflict of interest, ineffective project technical feasibility, and lack of commitment to transparency were found to be the most significant factors limiting construction procurement performance. Communication barriers and unconfidential tender evaluation process were found to be the low weighted risk factors. The findings can serve as a supportive mechanism for risks management in public construction procurement management. Therefore, construction procurement personnel at all levels of government may find this study relevant, while improving construction procurement performance in the country. It is recommended that construction procurement system should be focused on risks related to corruption, conflict of interest, and effective technical feasibility for improving the overall project performance.

  6. 48 CFR 9904.405-10 - [Reserved

    Science.gov (United States)

    2010-10-01

    ... Section 9904.405-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.405-10 [Reserved] ...

  7. 48 CFR 9904.402-10 - [Reserved

    Science.gov (United States)

    2010-10-01

    ... Section 9904.402-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.402-10 [Reserved] ...

  8. 48 CFR 9904.409-10 - [Reserved

    Science.gov (United States)

    2010-10-01

    ... Section 9904.409-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.409-10 [Reserved] ...

  9. 48 CFR 9904.408-10 - [Reserved

    Science.gov (United States)

    2010-10-01

    ... Section 9904.408-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.408-10 [Reserved] ...

  10. 48 CFR 9904.401-10 - [Reserved

    Science.gov (United States)

    2010-10-01

    ... Section 9904.401-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.401-10 [Reserved] ...

  11. 48 CFR 9904.403-10 - [Reserved

    Science.gov (United States)

    2010-10-01

    ... Section 9904.403-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.403-10 [Reserved] ...

  12. 48 CFR 9904.406-10 - [Reserved

    Science.gov (United States)

    2010-10-01

    ... Section 9904.406-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.406-10 [Reserved] ...

  13. 48 CFR 9904.404-10 - [Reserved

    Science.gov (United States)

    2010-10-01

    ... Section 9904.404-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.404-10 [Reserved] ...

  14. 48 CFR 9904.410-10 - [Reserved

    Science.gov (United States)

    2010-10-01

    ... Section 9904.410-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.410-10 [Reserved] ...

  15. 48 CFR 9904.407-10 - [Reserved

    Science.gov (United States)

    2010-10-01

    ... Section 9904.407-10 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.407-10 [Reserved] ...

  16. 46 CFR 76.23-10 - Quantity, pipe sizes, and discharge rates.

    Science.gov (United States)

    2010-10-01

    ... to the number of heads served. Minimum pipe sizes shall be as given in table 76.23-10(c). Table 76.23... the same time to deliver water from the two highest fire hose outlets in a manner similar to that...

  17. Evaluation of {sup 23}Na(n,2n){sup 22}Na reaction cross-sections

    Energy Technology Data Exchange (ETDEWEB)

    Manokhin, V N [Institute of Physics and Power Engineering, Obninsk (Russian Federation)

    1997-06-01

    Using available experimental data and (n,2n) excitation function systematics {sup 23}Na(n,2n){sup 22}Na reaction cross-sections were evaluated for energies ranging from the reaction threshold to 20 MeV. (author). 21 refs, 1 fig., 2 tabs.

  18. 75 FR 51416 - Defense Federal Acquisition Regulation Supplement; Acquisition of Commercial Items

    Science.gov (United States)

    2010-08-20

    ... provided clarification regarding situations under which the procurement of a major weapon system..., et seq. List of Subjects in 48 CFR Parts 202, 212, and 234 Government procurement. Ynette R. Shelkin...: DoD is adopting as final, without change, the interim rule that amended the Defense Federal...

  19. New Line Lists for planetological applications: HC3N and C4H2

    Science.gov (United States)

    Jolly, A.; Benilan, Y.; Fayt, A.

    2009-04-01

    The Composite Infrared Spectrometer (CIRS) on-board Cassini, after four years of operation in Saturnian orbit with over thirty close fly-bys of Titan, has obtained spectra in the far and mid-infrared with a spectral resolution of 0.5 cm-1. Mismatch between observed spectra and model spectra obtained from the available line lists has led us to study the bending bands of HC3N and C4H2, the longest carbon chains observed on Titan. Our experimental study for HC3N (Jolly et al. 2007, J.Mol.Spec) has shown that band intensities had to be revised and that including hot bands with lower level as high as 1300 cm-1 was necessary to model our experimental spectra at 0.5 cm-1 resolution. A new extended line list could be obtained by fitting high resolution data with the help of a global analysis. This line list was made available to the astronomers of the CIRS team and will be included in the next version of the GEISA data base. Thanks to the precision of the new spectroscopic data, 13C isotopologues of HC3N have been detected and quantified for the first time in the atmosphere of Titan (Jennings et al. 2008, ApJL). Search for the 15N isotopologues of HC3N will also be presented. The proportion of hot bands is even more important for C4H2 than for HC3N and a new extended line list was absolutely necessary to improve the CIRS spectral analysis. We will present a new line list and show comparison between synthetic spectra and experimental spectra of C4H2 obtained between 193 and 296 K at 0.1 and 0.5 cm-1 resolution. Comparison of model spectra to CIRS observations of C4H2 at 220 and 630 cm-1 will also be presented. Detections of hot bands and isotopes in cold environments such as Titan will be emphasized.

  20. Regional trade agreements & procurement rules : facilitators or hindrances?

    OpenAIRE

    ANDERSON, Robert D.; MÜLLER, Anna Caroline; PELLETIER, Philippe

    2015-01-01

    This Working Paper considers the significance of government procurement chapters in regional trade agreements (RTAs), both in their own right and vis-à-vis the WTO Agreement on Government Procurement (GPA). The paper finds, inter alia, that: (i) a strong complementarity exists between government procurement trade commitments and general goods and services trade commitments, making integration of procurement commitments in a more general system such as the WTO Agreements desirable; (ii) govern...

  1. Sustainable Bridge Infrastructure Procurement

    DEFF Research Database (Denmark)

    Safi, Mohammed; Du, Guangli; Simonsson, Peter

    2016-01-01

    The lack of a flexible but systematic approach for integrating lifecycle aspects into bridge investment decisions is a major obstacle hindering the procurement of sustainable bridge infrastructures. This paper addresses this obstacle by introducing a holistic approach that agencies could use...... to procure the most “sustainable” (lifecycle-efficient) bridge through a fair design-build (D-B) tendering process, considering all the main aspects: life-cycle cost (LCC), service life-span, aesthetic demands and environmental impacts (LCA)....

  2. Small Business Procurement Event

    Science.gov (United States)

    2014-08-13

    Small Business Procurement Event 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK...NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Department of the Navy,Office of Small Business Programs,720 Kennon...distribution unlimited 13. SUPPLEMENTARY NOTES NDIA 27th Navy Gold Coast Small Business Procurement Event, 12-13 Aug 2014, San Diego, CA. 14. ABSTRACT

  3. Analogous selection processes in declarative and procedural working memory: N-2 list-repetition and task-repetition costs.

    Science.gov (United States)

    Gade, Miriam; Souza, Alessandra S; Druey, Michel D; Oberauer, Klaus

    2017-01-01

    Working memory (WM) holds and manipulates representations for ongoing cognition. Oberauer (Psychology of Learning and Motivation, 51, 45-100, 2009) distinguishes between two analogous WM sub-systems: a declarative WM which handles the objects of thought, and a procedural WM which handles the representations of (cognitive) actions. Here, we assessed whether analogous effects are observed when participants switch between memory sets (declarative representations) and when they switch between task sets (procedural representations). One mechanism assumed to facilitate switching in procedural WM is the inhibition of previously used, but currently irrelevant task sets, as indexed by n-2 task-repetition costs (Mayr & Keele, Journal of Experimental Psychology: General, 129(1), 4-26, 2000). In this study we tested for an analogous effect in declarative WM. We assessed the evidence for n-2 list-repetition costs across eight experiments in which participants switched between memory lists to perform speeded classifications, mental arithmetic, or a local recognition test. N-2 list-repetition costs were obtained consistently in conditions assumed to increase interference between memory lists, and when lists formed chunks in long-term memory. Further analyses across experiments revealed a substantial contribution of episodic memory to n-2 list-repetition costs, thereby questioning the interpretation of n-2 repetition costs as reflecting inhibition. We reanalyzed the data of eight task-switching experiments, and observed that episodic memory also contributes to n-2 task-repetition costs. Taken together, these results show analogous processing principles in declarative and procedural WM, and question the relevance of inhibitory processes for efficient switching between mental sets.

  4. Uzbekistan : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2003-01-01

    Uzbekistan inherited the Soviet system for the procurement of goods, works and services for State needs. This system was suitable for a command economy but lacks the essential elements of competitiveness, transparency and accountability, which are the hallmarks of a market-based approach to government contracting. This Country Procurement Assessment Report (CPAR) comes at a time when a num...

  5. 21 CFR 81.10 - Termination of provisional listings of color additives.

    Science.gov (United States)

    2010-04-01

    ... FOODS, DRUGS, AND COSMETICS § 81.10 Termination of provisional listings of color additives. (a) Ext. D&C... has been observed in all groups fed at the 0.5 percent diet and above. (3) Groups of 4 dogs are being... dogs on the 2 percent dosage level died before 32 weeks; the other is living. Three of the dogs on the...

  6. 14 CFR 23.1142 - Auxiliary power unit controls.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Auxiliary power unit controls. 23.1142... Powerplant Controls and Accessories § 23.1142 Auxiliary power unit controls. Means must be provided on the... power unit. [Doc. No. 26344, 58 FR 18974, Apr. 9, 1993] ...

  7. Förändrat omhändertagande av patienter med uretärsten : - Lärdomar från ett förbättringsarbete

    OpenAIRE

    Khatami, Annelie

    2014-01-01

    Bakgrund: Omkring 10-15 % av befolkningen, oftast i arbetsför ålder, riskerar att någon gång drabbas av njursten. Nationella riktlinjer för njurstensbehandling saknas, men studier stödjer behandling inom 48 timmar för snabb symtomlindring och minskade besvär för patienten. Inom studerad verksamhet var tiden från diagnos till behandling lång och återinläggningarna var många, varför ett förbättringsarbete initierades. Syfte: Syftet med förbättringsarbetet var att halvera tiden från diagnos till...

  8. 22 CFR 226.44 - Procurement procedures.

    Science.gov (United States)

    2010-04-01

    ... Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.44 Procurement procedures. (a... and assistance, as appropriate, of such organizations as the Small Business Administration and the...

  9. International Research Study of Public Procurement

    NARCIS (Netherlands)

    Telgen, Jan; Harland, C.; Callender, G.; Harland, C.; Nassimbeni, G.; Schneller, E.

    2012-01-01

    In this chapter we examine the specific issue of public procurement, its importance to local, regional, national, and international economies as evidenced in a unique international comparative research study – the International Research Study of Public Procurement (IRSPP). First the public

  10. Drug procurement and management.

    Science.gov (United States)

    Salhotra, V S

    2003-03-01

    A strong drug procurement and management system under the RNTCP is critical to programme success. Significant improvements in manufacturing, inspection, supply, storage and quality control practices and procedures have been achieved due to an intensive RNTCP network. Drugs used in RNTCP are rifampicin, isoniazid, ethambutol, pyrazinamide and streptomycin. Patients of TB are categorised into I, II and III and each category has a different standarised treatment. Procurement, distribution system and quality assurance of drugs are narrated in brief in this article.

  11. Information sharing model in supporting implementation of e-procurement service: Case of Bandung city

    Science.gov (United States)

    Ramantoko, Gadang; Irawan, Herry

    2017-10-01

    This research examines the factors influencing the Information Sharing Model in Supporting Implementation of e-Procurement Services: Case of Bandung City in its early maturity stage. The early maturity of information sharing stage was determined using e-Government Maturity Stage Conceptual Framework from Estevez. Bandung City e-Procurement Information Sharing system was categorized at stage 1 in Estevez' model where the concern was mainly on assessing the benefit and risk of implementing the system. The Authors were using DeLone & McLean (D&M) Information System Success model to study benefit and risk of implementing the system in Bandung city. The model was then empirically tested by employing survey data that was collected from the available 40 listed supplier firms. D&M's model adjusted by Klischewski's description was introducing Information Quality, System Quality, and Service Quality as independent variable; Usability and User Satisfaction as intermediate dependent variable; and Perceived Net Benefit as final dependent variable. The findings suggested that, all of the predictors in D&M's model significantly influenced the net perceived benefit of implementing the e-Procurement system in the early maturity stage. The theoretical contribution of this research suggested that D&M's model might find useful in modeling complex information technology successfulness such as the one used in e-Procurement service. This research could also have implications for policy makers (LPSE) and system providers (LKPP) following the introduction of the service. However, the small number of respondent might be considered limitation of the study. The model needs to be further tested using larger number of respondents by involving the population of the firms in extended boundary/municipality area around Bandung.

  12. 10 CFR 871.2 - Public health and safety exemption.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Public health and safety exemption. 871.2 Section 871.2 Energy DEPARTMENT OF ENERGY AIR TRANSPORTATION OF PLUTONIUM § 871.2 Public health and safety exemption... property damage, or other significant threat to the public health and safety. [42 FR 48332, Sept. 23, 1977...

  13. Effects of Procurement Related Factors on Construction Project ...

    African Journals Online (AJOL)

    Several Literatures in construction management support the view that procurements have impacts on project performance. Aim of this study is to investigate the effects of procurement related factors of procurement selection criteria, tendering methods and variation orders on project performance. Purpose of the study is to ...

  14. 32 CFR 22.205 - Distinguishing assistance from procurement.

    Science.gov (United States)

    2010-07-01

    ... procurement contract, is the appropriate instrument, based on the following: (a) Purpose. (1) The grants... purpose is acquisition, then the grants officer shall judge that a procurement contract is the appropriate... 32 National Defense 1 2010-07-01 2010-07-01 false Distinguishing assistance from procurement. 22...

  15. Networking for knowledge capacity building of procurement professionals in Ghana

    Directory of Open Access Journals (Sweden)

    Kissi Ernest

    2016-12-01

    Full Text Available The role of public procurement professionals in achieving value for money in public procurement activities is widely acknowledged around the globe. This has inspired the organisation of training programmes and workshops for procurement professionals, particularly those in developing countries in order to hone their knowledge and skills for proper management of government projects. This paper sought to explore the opportunities in networking for knowledge capacity building of procurement professionals in Ghana. The study adopted quantitative research methods for both data collection and analysis. The paper revealed that professional networking can offer procurement professionals the opportunity to acquire new knowledge from external professionals, know global trends about procurement practice, and obtain new information from other institutions about procurement. It is recommended that a platform that can support a network of procurement professionals in Ghana should be developed in order to ensure effective interaction and communication among procurement professionals for their capacity building.

  16. 77 FR 71832 - Agency Information Collection Activities: Proposed Collection; Comments Requested: Application...

    Science.gov (United States)

    2012-12-04

    ... use any basic class of controlled substances listed in Schedule I or II or the List I chemicals ephedrine, pseudoephedrine, and phenylpropanolamine for purposes of manufacturing during the next calendar year shall apply on DEA Form 250 for procurement quota for such class or List I chemical. (5) An...

  17. 75 FR 59735 - Notice of Submission of Proposed Information Collection to OMB; Record of Employee Interview

    Science.gov (United States)

    2010-09-28

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5376-N-96] Notice of Submission of Proposed Information Collection to OMB; Record of Employee Interview AGENCY: Office of the Chief... responses. This notice also lists the following information: Title of Proposal: Record of Employee Interview...

  18. New harvesting technology in forest fuel procurement

    Energy Technology Data Exchange (ETDEWEB)

    Raitila, J. (VTT Technical Research Centre of Finland, Jyvaeskylae (Finland)), Email: jyrki.raitila@vtt.fi; Kaerhae, K. (Metsaeteho Oy, Helsinki (Finland)), Email: kalle.karha@metsateho.fi; Jylhae, P. (Finnish Forest Research Inst., Kannus (Finland)), Email: paula.jylha@metla.fi; Laitila, J. (Finnish Forest Research Inst., Joensuu (Finland)), Email: juha.laitila@metla.fi

    2009-07-01

    In order to increase the use of forest fuels, a regional development project was launched in the fall of 2008. The co-ordinator of the project is Metsaekeskus Keski-Suomi (Forestry Centre of Central Finland), while VTT (Technical Research Centre of Finland) is in charge of research and technical development. The aim of this project is to enhance energy wood procurement from early thinnings, to develop the supply chains of pine stump extraction, and to reduce storage losses of energy wood at roadside landings and at terminals. The results of a pre-feasibility study on the first-generation feller-bundler (Fixteri) by Metsaeteho Oy and the Finnish Forest Research Institute indicates that whole-tree bundling might enable undercutting of the current costs of separate procurement of pulp-wood and energy wood from first-thinning stands. The greatest cost-saving potential lies in small-diameter (d{sub 1.3} = 7-10 cm) first-thinning stands, which are currently relatively unprofitable sites for conventional pulpwood procurement based on single-tree harvesting. Preliminary tests of seasoning of whole-tree bundles have been very encouraging. In some cases the moisture content of energy wood bundles has decreased from 55 % to 25 % after about year of seasoning at the roadside (two summers). One of the most promising devices for pine stump harvesting was developed by Karelian Puu ja Metalli Oy. (orig.)

  19. Suzaku And Multi-Wavelength Observations of OJ 287 During the Periodic Optical Outburst in 2007

    Energy Technology Data Exchange (ETDEWEB)

    Seta, Hiromi; /Saitama U.; Isobe, N.; /Kyoto U.; Tashiro, Makoto S.; /Saitama U.; Yaji, Yuichi; /Saitama U.; Arai, Akira; /Hiroshima U.; Fukuhara, Masayuki; /Tokyo U. /Grad. U. for Adv. Stud., Nagano; Kohno, Kotaro; /Tokyo U.; Nakanishi, Koichiro; /Grad. U. for Adv. Stud., Nagano; Sasada, Mahito; /Hiroshima U.; Shimajiri, Yoshito; /Tokyo U. /Grad. U. for Adv. Stud., Nagano; Tosaki, Tomoka; /Grad. U. for Adv. Stud., Nagano; Uemura, Makoto; /Hiroshima U.; Anderhub, Hans; /Zurich, ETH; Antonelli, L.A.; /INFN, Rome; Antoranz, Pedro; /Madrid U.; Backes, Michael; /Dortmund U.; Baixeras, Carmen; /Barcelona, Autonoma U.; Balestra, Silvia; /Madrid U.; Barrio, Juan Abel; /Madrid U.; Bastieri, Denis; /Padua U. /INFN, Padua; Becerra Gonzalez, Josefa; /IAC, La Laguna /Dortmund U. /Lodz U. /Lodz U. /DESY /Zurich, ETH /Munich, Max Planck Inst. /Padua U. /INFN, Padua /Siena U. /INFN, Siena /Barcelona, IEEC /Munich, Max Planck Inst. /Barcelona, IEEC /Madrid U. /Zurich, ETH /Wurzburg U. /Zurich, ETH /Madrid U. /Munich, Max Planck Inst. /Zurich, ETH /Madrid U. /Barcelona, IFAE /IAC, La Laguna /Laguna U., Tenerife /INFN, Rome /Dortmund U. /Udine U. /INFN, Udine /INFN, Padua /Udine U. /INFN, Udine /Barcelona, IEEC /Madrid U. /Udine U. /INFN, Udine /Udine U. /INFN, Udine /Udine U. /INFN, Udine /IAC, La Laguna /Madrid, CIEMAT /Sierra Nevada Observ. /Zurich, ETH /Padua U. /INFN, Padua /Wurzburg U. /Barcelona, IFAE /UC, Davis /Barcelona, IFAE /Barcelona, IFAE /Madrid U. /Barcelona, Autonoma U. /Munich, Max Planck Inst. /IAC, La Laguna /Laguna U., Tenerife /Barcelona, IFAE /IAC, La Laguna /Munich, Max Planck Inst. /Barcelona, Autonoma U. /Munich, Max Planck Inst. /SLAC /IAC, La Laguna /Laguna U., Tenerife /Zurich, ETH /Wurzburg U. /Munich, Max Planck Inst. /Munich, Max Planck Inst. /Munich, Max Planck Inst. /Zurich, ETH /INFN, Rome /UC, Davis /Siena U. /INFN, Siena /Turku U. /Padua U. /INFN, Padua /Udine U. /INFN, Udine /Padua U. /INFN, Padua /Zurich, ETH /Munich, Max Planck Inst. /DESY /Sofiya, Inst. Nucl. Res. /Udine U. /INFN, Udine /Wurzburg U. /INFN, Rome /Padua U. /INFN, Padua /Barcelona, IFAE /Barcelona, IFAE /Siena U. /INFN, Siena /Wurzburg U. /Madrid U. /Munich, Max Planck Inst. /Munich, Max Planck Inst. /Barcelona, IEEC /Sierra Nevada Observ. /Barcelona, IFAE /Madrid U. /Turku U. /Munich, Max Planck Inst. /Munich, Max Planck Inst. /UC, Santa Cruz /Madrid U. /Siena U. /INFN, Siena /Barcelona, IEEC /Turku U. /Padua U. /INFN, Padua /Zurich, ETH /Siena U. /INFN, Siena /Sierra Nevada Observ. /Udine U. /INFN, Udine /INFN, Trieste /Padua U. /INFN, Padua /Sierra Nevada Observ. /Padua U. /INFN, Padua /Barcelona, IFAE /Barcelona, IFAE /Dortmund U. /Barcelona, IEEC /ICREA, Barcelona /Barcelona, IFAE /Zurich, ETH /Barcelona, Autonoma U. /Wurzburg U. /Padua U. /INFN, Padua /Munich, Max Planck Inst. /INFN, Rome /Sierra Nevada Observ. /DESY /Padua U. /INFN, Padua /Udine U. /INFN, Udine /Munich, Max Planck Inst. /Munich, Max Planck Inst. /Pisa U. /INFN, Pisa /Barcelona, IFAE /Barcelona, IEEC /Turku U. /Munich, Max Planck Inst. /Lodz U. /Lodz U. /Wurzburg U. /Siena U. /INFN, Siena /Zurich, ETH /Turku U. /INFN, Rome /Sofiya, Inst. Nucl. Res. /Barcelona, IFAE /Munich, Max Planck Inst. /DESY /ICREA, Barcelona /Barcelona, IEEC /Siena U. /INFN, Siena /Sofiya, Inst. Nucl. Res. /Munich, Max Planck Inst. /Munich, Max Planck Inst. /Barcelona, IEEC /Sierra Nevada Observ. /Barcelona, IFAE /Barcelona, Autonoma U.

    2011-12-01

    Suzaku observations of the blazar OJ 287 were performed in 2007 April 10-13 and November 7-9. They correspond to a quiescent and a flaring state, respectively. The X-ray spectra of the source can be well described with single power-law models in both exposures. The derived X-ray photon index and the flux density at 1 keV were found to be {Lambda} = 1.65 {+-} 0.02 and S{sub 1keV} = 215 {+-} 5 nJy, in the quiescent state. In the flaring state, the source exhibited a harder X-ray spectrum ({Lambda} = 1.50 {+-} 0.01) with a nearly doubled X-ray flux density S{sub 1keV} = 404{sub -5}{sup +6} nJy. Moreover, significant hard X-ray signals were detected up to {approx} 27 keV. In cooperation with the Suzaku, simultaneous radio, optical, and very-high-energy {gamma}-ray observations of OJ 287 were performed with the Nobeyama Millimeter Array, the KANATA telescope, and the MAGIC telescope, respectively. The radio and optical fluxes in the flaring state (3.04 {+-} 0.46 Jy and 8.93 {+-} 0.05 mJy at 86.75 Hz and in the V-band, respectively) were found to be higher by a factor of 2-3 than those in the quiescent state (1.73 {+-} 0.26 Jy and 3.03 {+-} 0.01 mJy at 86.75 Hz and in the V-band, respectively). No notable {gamma}-ray events were detected in either observation. The spectral energy distribution of OJ 287 indicated that the X-ray spectrum was dominated by inverse Compton radiation in both observations, while synchrotron radiation exhibited a spectral cutoff around the optical frequency. Furthermore, no significant difference in the synchrotron cutoff frequency was found between the quiescent and flaring states. According to a simple synchrotron self-Compton model, the change of the spectral energy distribution is due to an increase in the energy density of electrons with small changes of both the magnetic field strength and the maximum Lorentz factor of electrons.

  20. Arensky. Silhouettes (Suite N 2), Op. 23 / Jonathan Swain

    Index Scriptorium Estoniae

    Swain, Jonathan

    1991-01-01

    Uuest heliplaadist "Arensky. Silhouettes (Suite N 2), Op. 23. Scrjabin. Symphony N 3 in C minor, Op. 43 "Le divin poeme". Danish National Radio Symphony Orchestra. Neeme Järvi. Chandos cassette ABTD 1509; CD CHAN 8898 (66 minutes)

  1. 7 CFR 248.21 - Procurement and property management.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement and property management. 248.21 Section... Provisions § 248.21 Procurement and property management. (a) Requirements. State agencies shall comply with the requirements of 7 CFR part 3016 for procurement of supplies, equipment and other services with...

  2. Organ procurement after euthanasia: Belgian experience.

    Science.gov (United States)

    Ysebaert, D; Van Beeumen, G; De Greef, K; Squifflet, J P; Detry, O; De Roover, A; Delbouille, M-H; Van Donink, W; Roeyen, G; Chapelle, T; Bosmans, J-L; Van Raemdonck, D; Faymonville, M E; Laureys, S; Lamy, M; Cras, P

    2009-03-01

    Euthanasia was legalized in Belgium in 2002 for adults under strict conditions. The patient must be in a medically futile condition and of constant and unbearable physical or mental suffering that cannot be alleviated, resulting from a serious and incurable disorder caused by illness or accident. Between 2005 and 2007, 4 patients (3 in Antwerp and 1 in Liège) expressed their will for organ donation after their request for euthanasia was granted. Patients were aged 43 to 50 years and had a debilitating neurologic disease, either after severe cerebrovascular accident or primary progressive multiple sclerosis. Ethical boards requested complete written scenario with informed consent of donor and relatives, clear separation between euthanasia and organ procurement procedure, and all procedures to be performed by senior staff members and nursing staff on a voluntary basis. The euthanasia procedure was performed by three independent physicians in the operating room. After clinical diagnosis of cardiac death, organ procurement was performed by femoral vessel cannulation or quick laparotomy. In 2 patients, the liver, both kidneys, and pancreatic islets (one case) were procured and transplanted; in the other 2 patients, there was additional lung procurement and transplantation. Transplant centers were informed of the nature of the case and the elements of organ procurement. There was primary function of all organs. The involved physicians and transplant teams had the well-discussed opinion that this strong request for organ donation after euthanasia could not be waived. A clear separation between the euthanasia request, the euthanasia procedure, and the organ procurement procedure is necessary.

  3. 10 CFR 70.23a - Hearing required for uranium enrichment facility.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Hearing required for uranium enrichment facility. 70.23a... MATERIAL License Applications § 70.23a Hearing required for uranium enrichment facility. The Commission... license for construction and operation of a uranium enrichment facility. The Commission will publish...

  4. Computationally Efficient Modeling of Hydrocarbon Oxidation Chemistry and Flames Using Constituents and Species

    Science.gov (United States)

    2012-02-10

    Cremer , J-Y Chen, C.K. Westbrook, L.Q. Maurice, J. Propul. Power 18 (1) (2002) 192–198. K. Harstad, J. Bellan / Combustion and Flame 157 (2010) 1594... Cremer , J.-Y. Chen, C.K. Westbrook, L.Q. Maurice, J. Propuls. Power 18 (1) (2002) 192–198. a 10-9 10-7 10-5 10-3 10-1 101 N oh (m ol /m 3 ) T0 = 800...Caltech by the Army Research Office under the direction of Drs. David Mann, Kevin McNesby and Ralph Anthenien. References 1U. C. Müeller, N. Peters, A

  5. 'Procurement quality engineering': A measurement driven system to assure quality at each step in the procurement process

    International Nuclear Information System (INIS)

    Rinderman, R.R.

    1993-01-01

    The 'Procurement Quality Function' is an element of the Body of Knowledge of Quality Engineering, as defined by the American Society for Quality Control (ASQC). This paper describes the Procurement Quality function which has been installed as an integral part of the Quality Engineering group of the Technical and Management Support Services (T ampersand MSS) contractor to the United States Department of Energy (DOE) Yucca Mountain Site Characterization Project. Each of the elements of the T ampersand MSS Procurement Quality Engineering (PQE) system is discussed along with the measurements obtained. With the installation and development of the PQE system we have attained more meaningful evaluation of supplier capability, reduction of procurement document review reject ratios from 31% to less than 2% per quarter, more effective measurement and control of supplier performance, and the ability to enter into a meaningful teaming effort with T ampersand MSS suppliers

  6. Sustainable Procurement

    DEFF Research Database (Denmark)

    Telles, Pedro; Ølykke, Grith Skovgaard

    2017-01-01

    and within it how sustainable requirements have increased the level of compliance required, particularly regulatory compliance. Compliance was already present in previous EU public procurement frameworks, but its extent on Directive 2014/24/EU leads the authors to consider the current legal framework...

  7. THE EFFECTIVENESS OF BUDGET ALLOCATION IN PUBLIC PROCUREMENT

    Directory of Open Access Journals (Sweden)

    Irina Yu. Fedorova

    2015-01-01

    Full Text Available This article deals with the problem of budget allocation in the state order inRussia. Assesses the effectiveness of the financial mechanism of the public procurement business entities, purchasing activities are regulated by Federal Law №44-FZ and №223-FZ. The dynamics of financing the procurement process and reveal its features by using the most common methods of procurement through competitive bidding and without bidding. Identifies the causes of inefficient spending budget as a result of the non-competitive procurement methods by certain categories of business entities. 

  8. Playing the game of public procurement of innovation

    DEFF Research Database (Denmark)

    Rolfstam, Max

    Given the emergence and diffusion of policies aiming at promoting the utilisation of public procurement as an innovation policy instrument, it is remarkable that very little scholarly attention has been given to the teaching of public procurement of innovation. This paper sets out to contribute...... towards mending this gap, by discussing some considerations made in the context of the development and set up of a university course in public procurement of innovation. A major challenge for such an endeavour is how to bring the complexities of real-life public procurement into a university class...

  9. 76 FR 71867 - Addition of Certain Persons to the Entity List; and Implementation of Entity List Annual Review...

    Science.gov (United States)

    2011-11-21

    ... Kabul, Afghanistan, and A2 Ground Floor, City Computer Plaza, Shar-e-Naw, Kabul, Afghanistan; (3) Fazal..., Peshawar, Pakistan; (3) Fazal Rahim Farid, a.k.a., the following three aliases: --Fazel Rahim Farid... Afghanistan EAR). Fazal Rahim Farid, a.k.a., the For all items Presumption of denial........ 76 FR [INSERT FR...

  10. Innovation public procurement in Russia: problems of institutional arrangements

    Directory of Open Access Journals (Sweden)

    Korytcev Maxim, A.

    2015-12-01

    Full Text Available The paper explores the problems of public procurement in innovation sphere in Russia, its institutional organization. In international practice, some strategies of innovation stimulation (by public procurement are developing. There is necessity to use more elements of these strategies in Russian National Procurement System. The active National Public Procurement System has no enough effective methods and instruments for stimulating innovation development now.

  11. Indonesia - Procurement Modernization

    Data.gov (United States)

    Millennium Challenge Corporation — The evaluation seeks to establish evidence on the possible effects of an intervention designed to modernize public procurement: effects on cost savings, performance...

  12. Government Procurement Agreements and Telecommunications Business

    Directory of Open Access Journals (Sweden)

    Shin-Won Kang

    2001-12-01

    Full Text Available The opening of the telecommunications market is acceleration due to the world trends of deregulation and privatization under the WTO basic telecommunications agreements. Diversification of services and fast and efficient equipment procurement are becoming necessary conditions for the survival of telecommunications operators. However, the issue here is that telecommunications operators are still bound by the GPA (Government Procurement Agreement based on conditions of monopoly even though the procurement market in Korean is open substantially since 1997. Under such conditions, the continued application of the GPA on telecommunications operator who is highly competitive may result in a negative impact on the telecommunications business and quality of telecommunications service by undermining the autonomy of operator and decreasing operator’s procurement competitiveness. Therefore, this study examines the GPA and the issues raised by the agreement, and also attempts to suggest revisions or means of abrogating the unfair GPA with regards to the development and deregulation of the telecommunications business.

  13. NASA Procurement Career Development Program

    Science.gov (United States)

    1987-01-01

    The NASA Procurement Career Development Program establishes an agency-wide framework for the management of career development activity in the procurement field. Within this framework, installations are encouraged to modify the various components to meet installation-specific mission and organization requirements. This program provides a systematic process for the assessment of and planning for the development, training, and education required to increase the employees' competence in the procurement work functions. It includes the agency-wide basic knowledge and skills by career field and level upon which individual and organizational development plans are developed. Also, it provides a system that is compatible with other human resource management and development systems, processes, and activities. The compatibility and linkage are important in fostering the dual responsibility of the individual and the organization in the career development process.

  14. Data feature: Fuel procurement

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    This document is a review of the effect of fuel costs on the procurement strategies of a utility and a conjecture that the same strategies may have an effect on the price of fuel. Factors affecting fuel costs are reviewed, and a number of procurement strategies taken to trim fuel costs are reviewed. The major trend is away from long-term enrichment contracts and into such strategies as: (1) Spot market purchases, (2) Inventory reduction, (3) Purchase of CIS material, and (4) Market-related contracts instead of base-escalated contracts

  15. Study on Comparative Efficiencies in Vaccine Procurement Mechanisms

    OpenAIRE

    Bumpas, Janet

    2008-01-01

    Vaccinations are amongst the most cost-effective public health interventions. Vaccine procurement is a complex issue that interweaves the domains of public health, commodity security, ethics, and procurement. Its cross-disciplinary nature means that neither a straightforward analysis stemming from just one discipline nor a cookie-cutter application of World Bank procurement principles of e...

  16. Factors influencing e-Procurement adoption in the Nigerian building industry

    Directory of Open Access Journals (Sweden)

    Eziyi Offia Ibem

    2016-12-01

    Full Text Available Against the backdrop of increasing adoption of e-Procurement in supply chain management, there is a need for adequate knowledge of the factors that influence the decision by organizations in the building industry to use e-Procurement. This study aims to fill the knowledge gap through investigating the factors influencing e-Procurement adoption based on the data sourced in a questionnaire survey involving 213 organizations in the building industry. The survey was conducted between June and November 2015 in Nigeria. Descriptive statistics, factor and categorical regression analyses were used to analyze the data. The results show that the three most important factors influencing the adoption of e-Procurement amongst the participants, in order of importance, were: the benefits of e-Procurement in enhancing efficiency in project delivery; eliminating geographic barriers and effective communication among project team members. The 29 factors were investigated in seven different dimensions - the benefits of e-Procurement use; level of awareness on e-Procurement in construction; and the availability and cost of e-Procurement applications emerged as the three most significant predictors of e-Procurement adoption in the survey. The study concludes by identifying strategies that should be engaged in increasing the uptake and maximizing the benefits of e-Procurement in the Nigerian building industry.

  17. The impact of e-Procurement practice in Indonesia government: A Preliminary Study (The case of Electronic Procurement Service at Bekasi District)

    Science.gov (United States)

    Candra, S.; E Gunawan, F.

    2017-01-01

    In digital economy, government of Indonesia uses the internet to deliver services and to communicate with citizens and organizations. One of applications are e-Procurement and LPSE is a unit to hold the service system of e-Procurement. Procurement of goods and services electronically in addition will increase transparency and accountability, improve market access and healthy competition, as well as improving the efficiency of the procurement process. Based on the background and specific objectives to be achieved, then the research will be viewed from e-Marketplace participation, Trust and its impact on the performance of existing procurement within the institution. Methods of data analysis used in this research is by using analysis of Structural Equation Modelling (SEM) by using the program Partial Least Square (PLS) to examine the relationship between variables. The population used in this study is an enterprise as well as other clients using the system LPSE Bekasi District. There are three part in this study population, namely the provision of a company, customer, and supplier of LPSE users amounted to 60 users. From data analysis, there are one hypothesis that rejected. The implication of this study are implementation of e-procurement and e-marketplace participation giving impact to procurement performance.

  18. 75 FR 16821 - Insured Healthcare Facilities 232 Loan Application

    Science.gov (United States)

    2010-04-02

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5376-N-23] Insured Healthcare Facilities 232 Loan Application AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY...: Title of Proposal: Insured Healthcare Facilities 232 Loan Application. OMB Approval Number: 2502-New...

  19. Factores de riesgo y extensión de la enfermedad coronaria evaluada por angiografía coronaria no invasiva

    Directory of Open Access Journals (Sweden)

    Eduardo Diez

    2008-01-01

    Full Text Available AntecedentesA pesar de que numerosos estudios han establecido una clara asociación entre los factores de riesgo (FR y los eventos cardiovasculares, la relación entre la extensión total de la aterosclerosis coronaria y los FR no se ha establecido categóricamente.ObjetivoExplorar la relación entre factores de riesgo coronario tradicionales y la presencia y extensión de aterosclerosis coronaria mediante angiografía coronaria por tomografía computarizada multicorte (ACTCM de alta resolución.Material y métodosEn este estudio monocéntrico observacional, pacientes consecutivos en ritmo sinusal se estudiaron mediante angiografía coronaria por tomografía computarizada multicorte. La población se categorizó prospectivamente en tres grupos de acuerdo con el número de FR.ResultadosSe incluyeron en el estudio 117 pacientes. La edad media fue de 58,5 ± 10,6 años, el 81% eran hombres y el 19% eran diabéticos.Se observó una correlación significativa entre la prevalencia de cualquier lesión (p = 0,001, de lesiones significativas (p < 0,001, de múltiples lesiones no significativas (p < 0,001 y de múltiples lesiones significativas (p < 0,001 y el número de FR. En paralelo, tanto el número de lesiones (1,9 ± 2,3 versus 4,3 ± 3,3 versus 6,6 ± 2,6, p < 0,001 como el puntaje de calcio [2,79 (0,0; 44,0 versus 64,0 (0,0; 273,2 versus 539,0 (74,0; 1.405,9, p = 0,001] fueron significativamente mayores en pacientes con múltiples FR.Individualmente, numerosos FR se asociaron con la presencia de lesiones. La edad, la diabetes, la hipercolesterolemia, la hipertensión, el antecedente de IAM y el tabaquismo se encontraron relacionados con la presencia de aterosclerosis, ya sea por evidenciar mayor prevalencia de lesiones, mayor número total de lesiones y/o mayor puntaje de calcio.ConclusionesEn el presente estudio se encontró una relación significativa entre el número de factores de riesgo, así como de numerosos FR per se, y la extensión de

  20. 78 FR 9429 - Agency Information Collection Activities; Proposed Collection; Comments Requested: Application...

    Science.gov (United States)

    2013-02-08

    ... who desire to use any basic class of controlled substances listed in Schedule I or II or the List I chemicals ephedrine, pseudoephedrine, and phenylpropanolamine for purposes of manufacturing during the next calendar year shall apply on DEA Form 250 for procurement quota for such class or List I chemical. (5) An...

  1. Maldives : Electronic Government Procurement Readiness Assessment and Roadmap

    OpenAIRE

    World Bank

    2007-01-01

    The assessment focuses on the degree of readiness of Government of The Maldives's (GoTM's) current public procurement environment for making a transition from traditional paper-based, manual methods of procurement transaction processing and communication to electronic government procurement (e-GP). The e-GP Assessment was discussed individually with informed respondents in the public and p...

  2. Confusion-limited extragalactic source survey at 4.755 GHz. I. Source list and areal distributions

    International Nuclear Information System (INIS)

    Ledden, J.E.; Broderick, J.J.; Condon, J.J.; Brown, R.L.

    1980-01-01

    A confusion-limited 4.755-GHz survey covering 0.00 956 sr between right ascensions 07/sup h/05/sup m/ and 18/sup h/ near declination +35 0 has been made with the NRAO 91-m telescope. The survey found 237 sources and is complete above 15 mJy. Source counts between 15 and 100 mJy were obtained directly. The P(D) distribution was used to determine the number counts between 0.5 and 13.2 mJy, to search for anisotropy in the density of faint extragalactic sources, and to set a 99%-confidence upper limit of 1.83 mK to the rms temperature fluctuation of the 2.7-K cosmic microwave background on angular scales smaller than 7.3 arcmin. The discrete-source density, normalized to the static Euclidean slope, falls off sufficiently rapidly below 100 mJy that no new population of faint flat-spectrum sources is required to explain the 4.755-GHz source counts

  3. Potential fraudulent behaviors in e-procurement implementation in Indonesia

    Science.gov (United States)

    Huda, S. N.; Setiani, N.; Pulungan, R.; Winarko, E.

    2017-03-01

    Corruptions in public procurement have occurred in various parts of the world, especially in developing countries. Implementation of SPSE (electronic procurement system) as the e-procurement system in Indonesia is based on the government’s intentions towards clean and good governance by fighting corruption, collusion, and nepotism. Procurement in Indonesia is carried out through SPSE, which is developed by LKPP (Government Policy on Procurement of Goods/Services). Although this system has brought many positive effects, there are still found many practices of fraud occurring in the implementation of the system. In this paper, we try to identify these practices and then to systematically categorize and analyze them.

  4. 7 CFR 220.16 - Procurement standards.

    Science.gov (United States)

    2010-01-01

    ... nature. Matters concerning violation of law are to be referred to the local, State or Federal authority... § 3016.60(b) and (c) of this title are followed. The school food authority may use its own procurement procedures which reflect applicable State and local laws and regulations, provided that procurements made...

  5. An Identification of Problems Relating to Federal Procurement of Library Materials Prepared for Commission on Government Procurement.

    Science.gov (United States)

    Federal Library Committee, Washington, DC.

    The Federal Library Committee through the Task Force on Procurement Procedures in Federal Libraries is examining all problems and is recommending policies, procedures, and practices which will maximize the efficient procurement of library materials. It is suggested that the vehicle for this investigation be the appropriate Commission on Government…

  6. 'n Woord van AFRILEX / A Few Words from AFRILEX

    Directory of Open Access Journals (Sweden)

    Mariëtta Alberts

    2011-10-01

    Full Text Available Wanneer 'n mens oor die aktiwiteite en suksesse van die African Association for Lexicography (AFRILEX nadink, besef jy dat die vereniging dit regkry om op 'n baie ho? vlak te funksioneer, dit ten spyte van erge beperkinge betref-fende finansies, tyd en menslike hulpbronne.

  7. 76 FR 6488 - Notice of Submission of Proposed Information Collection to OMB; HUD-Owned Real Estate-Good...

    Science.gov (United States)

    2011-02-04

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5480-N-11] Notice of Submission of Proposed Information Collection to OMB; HUD-Owned Real Estate--Good Neighbor Next Door Program AGENCY... Lists the Following Information Title of Proposal: HUD-Owned Real Estate--Good Neighbor Next Door...

  8. Turning the Kaleidoscope: Five Perspectives on Procurement

    DEFF Research Database (Denmark)

    Munkgaard Møller, Morten; Vammen, Søren

    Purpose of this paper The purpose of the paper is to provide a conceptual foundation to enhance the body of knowledge related to procurement and sourcing through a framework consisting of five perspectives. The perspectives are: (1) Strategic, (2) Organizational, (3) Capability, (4) Supplier......, and a (5) Customer Perspectives. The aim is to develop a holistic perspective of procurement by applying these five essential, but very different perspectives in order to achieve a holistic picture of the function. Design/methodology/approach The foundation is derived from various well-established theories...... within the five perspectives. Specifically, procurement was viewed from the perspective of organizational theory, network theory, resource/knowledge based views of the firm, transaction cost theory and various theories within the strategic field of research Findings By viewing procurement through...

  9. Coarsening of (Fe, Cr)23C6 carbide phase on the tempering of 14Kh17N2 chromium-nickel steel

    International Nuclear Information System (INIS)

    Psarev, V.I.

    2002-01-01

    Paper lists the results of computer analysis of distribution according to sizes (Fe, Cr) 23 C 6 microparticles resulting from 14Kh17N2 steel tempering under 700 Deg C. Data were obtained at the maximum beneficial magnification of a light microscope. The mentioned curves of distribution densities are characterized by more reliable run from most permissible sizes of dispersed particles. Application of general rules of distributions and of previously elaborated procedure to identify experimental histograms with theoretical distributions enables to derive valuable information on dynamics of coarsening of a disperse phase in this case, as well [ru

  10. Outcomes of Multiple Listing for Adult Heart Transplantation in the United States: Analysis of OPTN Data From 2000 to 2013.

    Science.gov (United States)

    Givens, Raymond C; Dardas, Todd; Clerkin, Kevin J; Restaino, Susan; Schulze, P Christian; Mancini, Donna M

    2015-12-01

    This study sought to assess the association of multiple listing with waitlist outcomes and post-heart transplant (HT) survival. HT candidates in the United States may register at multiple centers. Not all candidates have the resources and mobility needed for multiple listing; thus this policy may advantage wealthier and less sick patients. We identified 33,928 adult candidates for a first single-organ HT between January 1, 2000 and December 31, 2013 in the Organ Procurement and Transplantation Network database. We identified 679 multiple-listed (ML) candidates (2.0%) who were younger (median age, 53 years [interquartile range (IQR): 43 to 60 years] vs. 55 years [IQR: 45 to 61 years]; p < 0.0001), more often white (76.4% vs. 70.7%; p = 0.0010) and privately insured (65.5% vs. 56.3%; p < 0.0001), and lived in zip codes with higher median incomes (US$90,153 [IQR: US$25,471 to US$253,831] vs. US$68,986 [IQR: US$19,471 to US$219,702]; p = 0.0015). Likelihood of ML increased with the primary center's median waiting time. ML candidates had lower initial priority (39.0% 1A or 1B vs. 55.1%; p < 0.0001) and predicted 90-day waitlist mortality (2.9% [IQR: 2.3% to 4.7%] vs. 3.6% [IQR: 2.3% to 6.0]%; p < 0.0001), but were frequently upgraded at secondary centers (58.2% 1A/1B; p < 0.0001 vs. ML primary listing). ML candidates had a higher HT rate (74.4% vs. 70.2%; p = 0.0196) and lower waitlist mortality (8.1% vs. 12.2%; p = 0.0011). Compared with a propensity-matched cohort, the relative ML HT rate was 3.02 (95% confidence interval: 2.59 to 3.52; p < 0.0001). There were no post-HT survival differences. Multiple listing is a rational response to organ shortage but may advantage patients with the means to participate rather than the most medically needy. The multiple-listing policy should be overturned. Copyright © 2015 American College of Cardiology Foundation. Published by Elsevier Inc. All rights reserved.

  11. Applying e-procurement system in the healthcare: the EPOS paradigm

    Science.gov (United States)

    Ketikidis, Panayiotis H.; Kontogeorgis, Apostolos; Stalidis, George; Kaggelides, Kostis

    2010-03-01

    One of the goals of procurement is to establish a competitive price, while e-procurement utilises electronic commerce to identify potential sources of supply, to purchase goods and services, to exchange contractual information and to interact with suppliers. Extensive academic work has been extensively devoted to e-procurement in diverse industries. However, applying e-procurement in the healthcare sector remains unexplored. It lacks an efficient e-procurement mechanism that will enable hospitals and healthcare suppliers to electronically exchange contractual information, aided by the technologies of optimisation and business rules. The development and deployment of e-procurement requires a major effort in the coordination of complex interorganisational business process. This article presents an e-procurement optimised system (EPOS) for the healthcare marketplace, a complete methodological approach for deploying and operating such system, as piloted in public and private hospitals in three European countries (Greece, Spain and Belgium) and suppliers of healthcare items in the fourth country (Italy). The efficient e-procurement mechanism that EPOS suggests enables hospitals and pharmaceutical and medical equipment suppliers to electronically exchange contractual information.

  12. Critical factors for sustainable food procurement in zoological collections.

    Science.gov (United States)

    Hanson, Jonathan H

    2015-01-01

    Food procurement can play an important role in sustainable food supply chain management by zoos, linking organizational operations to the biodiversity conservation and sustainability mission of zoological collections. This study therefore examines the critical factors that shape sustainable food procurement in zoo and aquariums. Using a web-based survey data was collected from 41 members of the British and Irish Association of Zoos and Aquariums (BIAZA). This included information on the sustainable food procurement practices of these institutions for both their human and animal food supply chains, as well as profile information and data on the factors contributing to and inhibiting sustainable procurement practices. Zoological collections operated by charities, and those with a certified sustainability standard, were found to have significantly higher levels of sustainable food procurement. Zoos and aquariums whose human food operations were not contracted to an external party were also found to have significantly higher levels of sustainable food procurement in their human food supply chain. The most important drivers of sustainable food procurement were cost savings, adequate financial support and improved product quality. The highest ranking barriers were higher costs, other issues taking priority and a lack of alternative suppliers. The results suggest that a number of critical factors shape sustainable food procurement in zoological collections in the British Isles. Financial factors, such as cost savings, were important considerations. The significance of mission-related factors, such as charity status, indicated that core values held by zoos and aquariums can also influence their food procurement practices. © 2015 Wiley Periodicals, Inc.

  13. 41 CFR 101-26.501-5 - Procurement time schedules.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement time schedules. 101-26.501-5 Section 101-26.501-5 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT...

  14. 75 FR 30845 - Request Voucher for Grant Payment and Line of Credit Control System (LOCCS) Voice Response System...

    Science.gov (United States)

    2010-06-02

    ... subject proposal. Payment request vouchers for distribution of grant funds using the automated Voice... Lists the Following Information Title of Proposal: Request Voucher for Grant Payment and Line of Credit... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5376-N-46] Request Voucher for Grant...

  15. 7 CFR 235.9 - Procurement and property management standards.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement and property management standards. 235.9... Procurement and property management standards. (a) Requirements. State agencies shall comply with the requirements of 7 CFR part 3016 concerning the procurement of supplies, equipment and other services with State...

  16. 41 CFR 101-26.507-2 - Procurement time schedule.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement time schedule. 101-26.507-2 Section 101-26.507-2 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND...

  17. 76 FR 74755 - Office of Procurement and Property Management; Agriculture Acquisition Regulation, Labor Law...

    Science.gov (United States)

    2011-12-01

    ... Management; Agriculture Acquisition Regulation, Labor Law Violations AGENCY: Office of Procurement and... Agriculture Acquisition Regulation (the ``AGAR'') to add a new clause at subpart 422.70 entitled ``Labor Law... respects and follows the policies and laws regarding worker labor protections particularly as they [[Page...

  18. 76 FR 74722 - Office of Procurement and Property Management; Agriculture Acquisition Regulation, Labor Law...

    Science.gov (United States)

    2011-12-01

    ... Management; Agriculture Acquisition Regulation, Labor Law Violations AGENCY: Office of Procurement and... Acquisition Regulation (the ``AGAR'') to add a new clause at subpart 422.70 entitled ``Labor Law Violations... objectives, this proposed rule adds a subpart and clause entitled Labor Law Violations to the Agriculture...

  19. Improving the effectiveness of public entities procurement practices

    OpenAIRE

    2013-01-01

    M. Com. (Business Management) The media and the Auditor General have extensively reported on the ineffective and unethical conduct of public sector employees regarding the procurement of goods and services. The Auditor General’s report demonstrates that there is evidence that public sector procurement processes are less than adequate to achieve constitutional procurement goals, which are to conduct processes that are fair, equitable, transparent, competitive and cost-effective The delivery...

  20. Nuclear power equipment procurement management under EPC mode

    International Nuclear Information System (INIS)

    Shuai Yuezhi

    2014-01-01

    Nuclear power equipment procurement is one of the major constraints and management difficulties in the process of domestic nuclear power project construction for a long time. The construction of Hainan Changjiang Project can not meet the milestones due to the major equipment supply delay. Through the introduction to the organization and features of Changjiang project equipment procurement under EPC mode, and the main problems in the procurement process and its reason analysis, the purpose of this paper is to put forward ideas and suggestions of these items, i.e. selection of equipment suppliers, equipment localization, mass material design and procurement, complete system equipment supply, spare parts delivery and storage, owner process management, providing reference for follow-up projects. (author)