WorldWideScience

Sample records for flood control projects

  1. Otter Brook Lake, New Hampshire Connecticut River Basin, Flood Control Project, Solid Waste Management Plan

    National Research Council Canada - National Science Library

    1996-01-01

    .... This plan provides guidance to establish policies, and responsibilities, procedures, and instructions for proper handling, storage, disposal and recycling of solid waste generated at the flood control project...

  2. The Wildcat-San Pablo Creek Flood Control Project and Its Implications for the Design of Environmentally Sensitive Flood Management Plans

    Science.gov (United States)

    A. L. Riley

    1989-01-01

    In 1982 a coalition of neighborhood and environmental organizations used a community organizing strategy of the early 1960's, referred to as "advocacy planning" to substantially redesign a traditional structural type of joint federal and local flood control project on Wildcat and San Pablo Creeks in North Richmond, California. Using a combination of...

  3. Flood control project selection using an interval type-2 entropy weight with interval type-2 fuzzy TOPSIS

    Science.gov (United States)

    Zamri, Nurnadiah; Abdullah, Lazim

    2014-06-01

    Flood control project is a complex issue which takes economic, social, environment and technical attributes into account. Selection of the best flood control project requires the consideration of conflicting quantitative and qualitative evaluation criteria. When decision-makers' judgment are under uncertainty, it is relatively difficult for them to provide exact numerical values. The interval type-2 fuzzy set (IT2FS) is a strong tool which can deal with the uncertainty case of subjective, incomplete, and vague information. Besides, it helps to solve for some situations where the information about criteria weights for alternatives is completely unknown. Therefore, this paper is adopted the information interval type-2 entropy concept into the weighting process of interval type-2 fuzzy TOPSIS. This entropy weight is believed can effectively balance the influence of uncertainty factors in evaluating attribute. Then, a modified ranking value is proposed in line with the interval type-2 entropy weight. Quantitative and qualitative factors that normally linked with flood control project are considered for ranking. Data in form of interval type-2 linguistic variables were collected from three authorised personnel of three Malaysian Government agencies. Study is considered for the whole of Malaysia. From the analysis, it shows that diversion scheme yielded the highest closeness coefficient at 0.4807. A ranking can be drawn using the magnitude of closeness coefficient. It was indicated that the diversion scheme recorded the first rank among five causes.

  4. Flood risk control of dams and dykes in middle reach of Huaihe River

    Directory of Open Access Journals (Sweden)

    Zhen-kun MA

    2014-01-01

    Full Text Available Three stochastic mathematical models for calculation of the reservoir flood regulation process, river course flood release, and flood risk rate under flood control were established based on the theory of stochastic differential equations and features of flood control systems in the middle reach of the Huaihe River from Xixian to the Bengbu floodgate, comprehensively considering uncertain factors of hydrology, hydraulics, and engineering control. They were used to calculate the flood risk rate with flood regulation of five key reservoirs, including the Meishan, Xianghongdian, Nianyushan, Mozitan, and Foziling reservoirs in the middle reach of the Huaihe River under different flood frequencies, the flood risk rate with river course flood release under design and check floods for the trunk of the Huaihe River in conjunction with relevant flood storage areas, and the flood risk rate with operation of the Linhuaigang Project under design and check floods. The calculated results show that (1 the five reservoirs can withstand design floods, but the Xianghongdian and Foziling reservoirs will suffer overtopping accidents under check floods; (2 considering the service of flood storage areas under the design flood conditions of the Huaihe River, the mean flood risk rate with flood regulation of dykes and dams from Xixian to the Bengbu floodgate is about 0.2, and the trunk of the Huaihe River can generally withstand design floods; and (3 under a check flood with the flood return period of 1 000 years, the risk rate of overtopping accidents of the Linhuaigang Project is not larger than 0.15, indicating that it has a high flood regulation capacity. Through regulation and application of the flood control system of the Linhuigang Project, the Huaihe River Basin can withstand large floods, and the safety of the protected area can be ensured.

  5. 18 CFR 1304.407 - Development within flood control storage zones of TVA reservoirs.

    Science.gov (United States)

    2010-04-01

    ... flood control storage zones of TVA reservoirs. 1304.407 Section 1304.407 Conservation of Power and Water... documentation related to flood control storage, provided the loss of flood control storage caused by the project... control storage. If this determination can be made, the applicant must then demonstrate how the loss of...

  6. Effects of Flood Control Strategies on Flood Resilience Under Sociohydrological Disturbances

    Science.gov (United States)

    Sung, Kyungmin; Jeong, Hanseok; Sangwan, Nikhil; Yu, David J.

    2018-04-01

    A community capacity to cope with flood hazards, or community flood resilience, emerges from the interplay of hydrological and social processes. This interplay can be significantly influenced by the flood control strategy adopted by a society, i.e., how a society sets its desired flood protection level and strives to achieve this goal. And this interplay can be further complicated by rising land-sea level differences, seasonal water level fluctuations, and economic change. But not much research has been done on how various forms of flood control strategies affect human-flood interactions under these disturbances and therefore flood resilience in the long run. The current study is an effort to address these issues by developing a conceptual model of human-flood interaction mediated by flood control strategies. Our model extends the existing model of Yu et al. (2017), who investigated the flood resilience of a community-based flood protection system in coastal Bangladesh. The major extensions made in this study are inclusions of various forms of flood control strategies (both adaptive and nonadaptive ones), the challenge of rising land-sea level differences, and various high tide level scenarios generated from modifying the statistical variances and averages. Our results show that adaptive forms of flood control strategies tend to outperform nonadaptive ones for maintaining the model community's flood protection system. Adaptive strategies that dynamically adjust target flood protection levels through close monitoring of flood damages and social memories of flood risk can help the model community deal with various disturbances.

  7. Assess the flood resilience tools integration in the landuse projects

    Science.gov (United States)

    Moulin, E.; Deroubaix, J.-F.

    2012-04-01

    Despite a severe regulation concerning the building in flooding areas, 80% of these areas are already built in the Greater Paris (Paris, Val-de-Marne, Hauts-de-Seine and Seine-Saint-Denis). The land use in flooding area is presented as one of the main solutions to solve the ongoing real estate pressure. For instance some of the industrial wastelands located along the river are currently in redevelopment and residential buildings are planned. So the landuse in the flooding areas is currently a key issue in the development of the Greater Paris area. To deal with floods there are some resilience tools, whether structural (such as perimeter barriers or building aperture barriers, etc) or non structural (such as warning systems, etc.). The technical solutions are available and most of the time efficient1. Still, we notice that these tools are not much implemented. The people; stakeholders and inhabitants, literally seems to be not interested. This papers focus on the integration of resilience tools in urban projects. Indeed one of the blockages in the implementation of an efficient flood risk prevention policy is the lack of concern of the landuse stakeholders and the inhabitants for the risk2. We conducted an important number of interviews with stakeholders involved in various urban projects and we assess, in this communication, to what extent the improvement of the resilience to floods is considered as a main issue in the execution of an urban project? How this concern is maintained or could be maintained throughout the project. Is there a dilution of this concern? In order to develop this topic we rely on a case study. The "Ardoines" is a project aiming at redeveloping an industrial site (South-East Paris), into a project including residential and office buildings and other amenities. In order to elaborate the master plan, the urban planning authority brought together some flood risk experts. According to the comments of the experts, the architect in charge of the

  8. Evaluating miscible flood projects for acquisition or viability

    International Nuclear Information System (INIS)

    Cassinat, J.C.

    1991-01-01

    Very little information exists regarding evaluating enhanced oil recovery (EOR) projects, in particular miscible floods. Due to the size and scope of most tertiary recovery projects, standard evaluation rules and techniques are too general and vague to adequately model these schemes. A procedure for identifying the risks associated with miscible EOR projects is presented. It is essential to set up a cash flow model that accurately represents the future performance of a miscible flood. Included in the model are the timing of crucial events such as expected solvent breakthrough and the injection of trace gas. The cash flow analysis allows a quick audit procedure and converts production into a monetary or economic evaluation criteria that can easily be compared to other investment alternatives. When evaluating a miscible flood project, forecasting production, solvent and chase gas recovery costs can become quite complex. An organized procedure for an evaluation will ensure that a comprehensive and thorough examination of all the data is completed, and will increase confidence levels associated with decision making. 32 refs., 4 figs., 4 tabs

  9. Flash flood forecasting, warning and risk management: the HYDRATE project

    International Nuclear Information System (INIS)

    Borga, M.; Anagnostou, E.N.; Bloeschl, G.; Creutin, J.-D.

    2011-01-01

    Highlights: → We characterize flash flood events in various regions of Europe. → We provide guidance to improve observations and monitoring of flash floods. → Flash floods are associated to orography and are influenced by initial soil moisture conditions. → Models for flash flood forecasting and flash flood hazard assessment are illustrated and discussed. → We examine implications for flood risk policy and discuss recommendations received from end users. - Abstract: The management of flash flood hazards and risks is a critical component of public safety and quality of life. Flash-floods develop at space and time scales that conventional observation systems are not able to monitor for rainfall and river discharge. Consequently, the atmospheric and hydrological generating mechanisms of flash-floods are poorly understood, leading to highly uncertain forecasts of these events. The objective of the HYDRATE project has been to improve the scientific basis of flash flood forecasting by advancing and harmonising a European-wide innovative flash flood observation strategy and developing a coherent set of technologies and tools for effective early warning systems. To this end, the project included actions on the organization of the existing flash flood data patrimony across Europe. The final aim of HYDRATE was to enhance the capability of flash flood forecasting in ungauged basins by exploiting the extended availability of flash flood data and the improved process understanding. This paper provides a review of the work conducted in HYDRATE with a special emphasis on how this body of research can contribute to guide the policy-life cycle concerning flash flood risk management.

  10. Climate, orography and scale controls on flood frequency in Triveneto (Italy

    Directory of Open Access Journals (Sweden)

    S. Persiano

    2016-05-01

    Full Text Available The growing concern about the possible effects of climate change on flood frequency regime is leading Authorities to review previously proposed reference procedures for design-flood estimation, such as national flood frequency models. Our study focuses on Triveneto, a broad geographical region in North-eastern Italy. A reference procedure for design flood estimation in Triveneto is available from the Italian NCR research project "VA.PI.", which considered Triveneto as a single homogeneous region and developed a regional model using annual maximum series (AMS of peak discharges that were collected up to the 1980s by the former Italian Hydrometeorological Service. We consider a very detailed AMS database that we recently compiled for 76 catchments located in Triveneto. All 76 study catchments are characterized in terms of several geomorphologic and climatic descriptors. The objective of our study is threefold: (1 to inspect climatic and scale controls on flood frequency regime; (2 to verify the possible presence of changes in flood frequency regime by looking at changes in time of regional L-moments of annual maximum floods; (3 to develop an updated reference procedure for design flood estimation in Triveneto by using a focused-pooling approach (i.e. Region of Influence, RoI. Our study leads to the following conclusions: (1 climatic and scale controls on flood frequency regime in Triveneto are similar to the controls that were recently found in Europe; (2 a single year characterized by extreme floods can have a remarkable influence on regional flood frequency models and analyses for detecting possible changes in flood frequency regime; (3 no significant change was detected in the flood frequency regime, yet an update of the existing reference procedure for design flood estimation is highly recommended and we propose the RoI approach for properly representing climate and scale controls on flood frequency in Triveneto, which cannot be regarded

  11. Large projected increases in rain-on-snow flood potential over western North America

    Science.gov (United States)

    Musselman, K. N.; Ikeda, K.; Barlage, M. J.; Lehner, F.; Liu, C.; Newman, A. J.; Prein, A. F.; Mizukami, N.; Gutmann, E. D.; Clark, M. P.; Rasmussen, R.

    2017-12-01

    In the western US and Canada, some of the largest annual flood events occur when warm storm systems drop substantial rainfall on extensive snow-cover. For example, last winter's Oroville dam crisis in California was exacerbated by rapid snowmelt during a rain-on-snow (ROS) event. We present an analysis of ROS events with flood-generating potential over western North America simulated at high-resolution by the Weather Research and Forecasting (WRF) model run for both a 13-year control time period and re-run with a `business-as-usual' future (2071-2100) climate scenario. Daily ROS with flood-generating potential is defined as rainfall of at least 10 mm per day falling on snowpack of at least 10 mm water equivalent, where the sum of rainfall and snowmelt contains at least 20% snowmelt. In a warmer climate, ROS is less frequent in regions where it is historically common, and more frequent elsewhere. This is evidenced by large simulated reductions in snow-cover and ROS frequency at lower elevations, particularly in warmer, coastal regions, and greater ROS frequency at middle elevations and in inland regions. The same trend is reflected in the annual-average ROS runoff volume (rainfall + snowmelt) aggregated to major watersheds; large reductions of 25-75% are projected for much of the U.S. Pacific Northwest, while large increases are simulated for the Colorado River basin, western Canada, and the higher elevations of the Sierra Nevada. In the warmer climate, snowmelt contributes substantially less to ROS runoff per unit rainfall, particularly in inland regions. The reduction in snowmelt contribution is due to a shift in ROS timing from warm spring events to cooler winter conditions and/or from warm, lower elevations to cool, higher elevations. However, the slower snowmelt is offset by an increase in rainfall intensity, maintaining the flood potential of ROS at or above historical levels. In fact, we report large projected increases in the intensity of extreme ROS events

  12. Flood risk assessment in France: comparison of extreme flood estimation methods (EXTRAFLO project, Task 7)

    Science.gov (United States)

    Garavaglia, F.; Paquet, E.; Lang, M.; Renard, B.; Arnaud, P.; Aubert, Y.; Carre, J.

    2013-12-01

    In flood risk assessment the methods can be divided in two families: deterministic methods and probabilistic methods. In the French hydrologic community the probabilistic methods are historically preferred to the deterministic ones. Presently a French research project named EXTRAFLO (RiskNat Program of the French National Research Agency, https://extraflo.cemagref.fr) deals with the design values for extreme rainfall and floods. The object of this project is to carry out a comparison of the main methods used in France for estimating extreme values of rainfall and floods, to obtain a better grasp of their respective fields of application. In this framework we present the results of Task 7 of EXTRAFLO project. Focusing on French watersheds, we compare the main extreme flood estimation methods used in French background: (i) standard flood frequency analysis (Gumbel and GEV distribution), (ii) regional flood frequency analysis (regional Gumbel and GEV distribution), (iii) local and regional flood frequency analysis improved by historical information (Naulet et al., 2005), (iv) simplify probabilistic method based on rainfall information (i.e. Gradex method (CFGB, 1994), Agregee method (Margoum, 1992) and Speed method (Cayla, 1995)), (v) flood frequency analysis by continuous simulation approach and based on rainfall information (i.e. Schadex method (Paquet et al., 2013, Garavaglia et al., 2010), Shyreg method (Lavabre et al., 2003)) and (vi) multifractal approach. The main result of this comparative study is that probabilistic methods based on additional information (i.e. regional, historical and rainfall information) provide better estimations than the standard flood frequency analysis. Another interesting result is that, the differences between the various extreme flood quantile estimations of compared methods increase with return period, staying relatively moderate up to 100-years return levels. Results and discussions are here illustrated throughout with the example

  13. Projections of Flood Risk using Credible Climate Signals in the Ohio River Basin

    Science.gov (United States)

    Schlef, K.; Robertson, A. W.; Brown, C.

    2017-12-01

    Estimating future hydrologic flood risk under non-stationary climate is a key challenge to the design of long-term water resources infrastructure and flood management strategies. In this work, we demonstrate how projections of large-scale climate patterns can be credibly used to create projections of long-term flood risk. Our study area is the northwest region of the Ohio River Basin in the United States Midwest. In the region, three major teleconnections have been previously demonstrated to affect synoptic patterns that influence extreme precipitation and streamflow: the El Nino Southern Oscillation, the Pacific North American pattern, and the Pacific Decadal Oscillation. These teleconnections are strongest during the winter season (January-March), which also experiences the greatest number of peak flow events. For this reason, flood events are defined as the maximum daily streamflow to occur in the winter season. For each gage in the region, the location parameter of a log Pearson type 3 distribution is conditioned on the first principal component of the three teleconnections to create a statistical model of flood events. Future projections of flood risk are created by forcing the statistical model with projections of the teleconnections from general circulation models selected for skill. We compare the results of our method to the results of two other methods: the traditional model chain (i.e., general circulation model projections to downscaling method to hydrologic model to flood frequency analysis) and that of using the historic trend. We also discuss the potential for developing credible projections of flood events for the continental United States.

  14. U.S. Coastal Flood Damage Reduction Projects: Federal Authorization and Investment Trends

    Science.gov (United States)

    Carter, N. T.

    2015-12-01

    The 2015 U.S. Environmental Protection Agency report Climate Change in the United States: Benefits of Global Action estimated the potential cumulative future economic impacts of storm surge and sea-level rise on U.S. coasts during this century at 5 trillion (2014 dollars) if no adaptation measures are implemented. These impacts drop to 0.8 trillion if investments are made in cost-effective adaptations and protections. Awareness of flood risk and its long-term fiscal impact historically has proven insufficient to motivate pre-disaster land use changes and investments in mitigation and protection. While many adaptations and protections fall largely under state and local authority, some stakeholders are interested in federal coastal flood protection projects, including projects by the U.S. Army Corps of Engineers. Since the 1950s, Congress has authorized the Corps to construct specific coastal projects. The broad vision, strategy, and priorities for the federal role in coastal flood damage reduction projects nonetheless remain ill-defined. This research analyzes (1) the authorization and appropriations trends for Corps coastal storm damage reduction projects, and (2) how Corps feasibility studies account for and address coastal flood hazards. Identified trends include: emergency appropriations for storm-damaged areas outstrip annual investments in coastal flood projects; the rate at which projects are congressionally approved for construction outpaces the rate at which construction is funded; and how coastal protection projects are evaluated in Corps feasibility studies shows variation and change in agency practices. These trends have consequences; they affect public and local expectations when projects begin providing protection benefits, and may influence investments in other adaptation measures. These trends also raise questions for policymakers at all levels and for scientists and practitioners interested in coastal flood resilience.

  15. Projections of hepatitis A virus infection associated with flood events by 2020 and 2030 in Anhui Province, China

    Science.gov (United States)

    Gao, Lu; Zhang, Ying; Ding, Guoyong; Liu, Qiyong; Wang, Changke; Jiang, Baofa

    2016-12-01

    Assessing and responding to health risk of climate change is important because of its impact on the natural and societal ecosystems. More frequent and severe flood events will occur in China due to climate change. Given that population is projected to increase, more people will be vulnerable to flood events, which may lead to an increased incidence of HAV infection in the future. This population-based study is going to project the future health burden of HAV infection associated with flood events in Huai River Basin of China. The study area covered four cities of Anhui province in China, where flood events were frequent. Time-series adjusted Poisson regression model was developed to quantify the risks of flood events on HAV infection based on the number of daily cases during summer seasons from 2005 to 2010, controlling for other meteorological variables. Projections of HAV infection in 2020 and 2030 were estimated based on the scenarios of flood events and demographic data. Poisson regression model suggested that compared with the periods without flood events, the risks of severe flood events for HAV infection were significant (OR = 1.28, 95 % CI 1.05-1.55), while risks were not significant from moderate flood events (OR = 1.16, 95 % CI 0.72-1.87) and mild flood events (OR = 1.14, 95 % CI 0.87-1.48). Using the 2010 baseline data and the flood event scenarios (one severe flood event), increased incidence of HAV infection were estimated to be between 0.126/105 and 0.127/105 for 2020. Similarly, the increased HAV infection incidence for 2030 was projected to be between 0.382/105 and 0.399/105. Our study has, for the first time, quantified the increased incidence of HAV infection that will result from flood events in Anhui, China, in 2020 and 2030. The results have implications for public health preparation for developing public health responses to reduce HAV infection during future flood events.

  16. The Effects of Saltwater Intrusion to Flood Mitigation Project

    Science.gov (United States)

    Azida Abu Bakar, Azinoor; Khairudin Khalil, Muhammad

    2018-03-01

    The objective of this study is to determine the effects of saltwater intrusion to flood mitigation project located in the flood plains in the district of Muar, Johor. Based on the studies and designs carried out, one of the effective flood mitigation options identified is the Kampung Tanjung Olak bypass and Kampung Belemang bypass at the lower reaches of Sungai Muar. But, the construction of the Kampung Belemang and Tanjung Olak bypass, while speeding up flood discharges, may also increase saltwater intrusion during drought low flows. Establishing the dynamics of flooding, including replicating the existing situation and the performance with prospective flood mitigation interventions, is most effectively accomplished using computer-based modelling tools. The finding of this study shows that to overcome the problem, a barrage should be constructed at Sungai Muar to solve the saltwater intrusion and low yield problem of the river.

  17. Differences in flood hazard projections in Europe – their causes and consequences for decision making

    Science.gov (United States)

    Kundzewicz, Z. W.; Krysanova, V.; Dankers, R.; Hirabayashi, Y.; Kanae, S.; Hattermann, F. F.; Huang, S.; Milly, Paul C.D.; Stoffel, M.; Driessen, P.P.J.; Matczak, P.; Quevauviller, P.; Schellnhuber, H.-J.

    2017-01-01

    This paper interprets differences in flood hazard projections over Europe and identifies likely sources of discrepancy. Further, it discusses potential implications of these differences for flood risk reduction and adaptation to climate change. The discrepancy in flood hazard projections raises caution, especially among decision makers in charge of water resources management, flood risk reduction, and climate change adaptation at regional to local scales. Because it is naïve to expect availability of trustworthy quantitative projections of future flood hazard, in order to reduce flood risk one should focus attention on mapping of current and future risks and vulnerability hotspots and improve the situation there. Although an intercomparison of flood hazard projections is done in this paper and differences are identified and interpreted, it does not seems possible to recommend which large-scale studies may be considered most credible in particular areas of Europe.

  18. Potential increase in floods in California's Sierra Nevada under future climate projections

    Science.gov (United States)

    Das, T.; Dettinger, M.D.; Cayan, D.R.; Hidalgo, H.G.

    2011-01-01

    California's mountainous topography, exposure to occasional heavily moisture-laden storm systems, and varied communities and infrastructures in low lying areas make it highly vulnerable to floods. An important question facing the state-in terms of protecting the public and formulating water management responses to climate change-is "how might future climate changes affect flood characteristics in California?" To help address this, we simulate floods on the western slopes of the Sierra Nevada Mountains, the state's primary catchment, based on downscaled daily precipitation and temperature projections from three General Circulation Models (GCMs). These climate projections are fed into the Variable Infiltration Capacity (VIC) hydrologic model, and the VIC-simulated streamflows and hydrologic conditions, from historical and from projected climate change runs, allow us to evaluate possible changes in annual maximum 3-day flood magnitudes and frequencies of floods. By the end of the 21st Century, all projections yield larger-than-historical floods, for both the Northern Sierra Nevada (NSN) and for the Southern Sierra Nevada (SSN). The increases in flood magnitude are statistically significant (at p models, while under the third scenario, GFDL CM2. 1, frequencies remain constant or decline slightly, owing to an overall drying trend. These increases appear to derive jointly from increases in heavy precipitation amount, storm frequencies, and days with more precipitation falling as rain and less as snow. Increases in antecedent winter soil moisture also play a role in some areas. Thus, a complex, as-yet unpredictable interplay of several different climatic influences threatens to cause increased flood hazards in California's complex western Sierra landscapes. ?? 2011 Springer Science+Business Media B.V.

  19. Economic Assessment of Flood Control Facilities under Climate Uncertainty: A Case of Nakdong River, South Korea

    Directory of Open Access Journals (Sweden)

    Kyeongseok Kim

    2018-01-01

    Full Text Available Climate change contributes to enhanced flood damage that has been increasing for the last several decades. Understanding climate uncertainties improves adaptation strategies used for investment in flood control facilities. This paper proposes an investment decision framework for one flood zone to cope with future severe climate impacts. This framework can help policy-makers investigate the cost of future damage and conduct an economic assessment using real options under future climate change scenarios. The proposed methodology provides local municipalities with an adaptation strategy for flood control facilities in a flood zone. Using the proposed framework, the flood prevention facilities in the Nakdong River Basin of South Korea was selected as a case study site to analyze the economic assessment of the investments for flood control facilities. Using representative concentration pathway (RCP climate scenarios, the cost of future flood damage to 23 local municipalities was calculated, and investment strategies for adaptation were analyzed. The project option value was determined by executing an option to invest in an expansion that would adapt to floods under climate change. The results of the case study showed that the proposed flood facilities are economically feasible under both scenarios used. The framework is anticipated to present guidance for establishing investment strategies for flood control facilities of a flood zone in multiple municipalities’ settings.

  20. Flooding and Flood Management

    Science.gov (United States)

    Brooks, K.N.; Fallon, J.D.; Lorenz, D.L.; Stark, J.R.; Menard, Jason; Easter, K.W.; Perry, Jim

    2011-01-01

    Floods result in great human disasters globally and nationally, causing an average of $4 billion of damages each year in the United States. Minnesota has its share of floods and flood damages, and the state has awarded nearly $278 million to local units of government for flood mitigation projects through its Flood Hazard Mitigation Grant Program. Since 1995, flood mitigation in the Red River Valley has exceeded $146 million. Considerable local and state funding has been provided to manage and mitigate problems of excess stormwater in urban areas, flooding of farmlands, and flood damages at road crossings. The cumulative costs involved with floods and flood mitigation in Minnesota are not known precisely, but it is safe to conclude that flood mitigation is a costly business. This chapter begins with a description of floods in Minneosta to provide examples and contrasts across the state. Background material is presented to provide a basic understanding of floods and flood processes, predication, and management and mitigation. Methods of analyzing and characterizing floods are presented because they affect how we respond to flooding and can influence relevant practices. The understanding and perceptions of floods and flooding commonly differ among those who work in flood forecasting, flood protection, or water resource mamnagement and citizens and businesses affected by floods. These differences can become magnified following a major flood, pointing to the need for better understanding of flooding as well as common language to describe flood risks and the uncertainty associated with determining such risks. Expectations of accurate and timely flood forecasts and our ability to control floods do not always match reality. Striving for clarity is important in formulating policies that can help avoid recurring flood damages and costs.

  1. Flood control design requirements and flood evaluation methods of inland nuclear power plant

    International Nuclear Information System (INIS)

    Zhang Ailing; Wang Ping; Zhu Jingxing

    2011-01-01

    Effect of flooding is one of the key safety factors and environmental factors in inland nuclear power plant sitting. Up to now, the rule of law and standard systems are established for the selection of nuclear power plant location and flood control requirements in China. In this paper flood control standards of China and other countries are introduced. Several inland nuclear power plants are taken as examples to thoroughly discuss the related flood evaluation methods. The suggestions are also put forward in the paper. (authors)

  2. Differences in flood hazard projections in Europe – their causes and consequences for decision making

    NARCIS (Netherlands)

    Kundzewicz, Zbigniew W.; Krysanova, V.; Dankers, R.; Hirabayashi, Y.; Kanae, S.; Hattermann, F. F.; Huang, S.; Milly, P. C. D.; Stoffel, M.H.; Driessen, P. P. J.; Matczak, Piotr; Quevauviller, P.; Schellnhuber, H. J.

    2017-01-01

    This paper interprets differences in flood hazard projections over Europe and identifies likely sources of discrepancy. Further, it discusses potential implications of these differences for flood risk reduction and adaptation to climate change. The discrepancy in flood hazard projections raises

  3. Quantifying the effect of autonomous adaptation to global river flood projections: application to future flood risk assessments

    Science.gov (United States)

    Kinoshita, Youhei; Tanoue, Masahiro; Watanabe, Satoshi; Hirabayashi, Yukiko

    2018-01-01

    This study represents the first attempt to quantify the effects of autonomous adaptation on the projection of global flood hazards and to assess future flood risk by including this effect. A vulnerability scenario, which varies according to the autonomous adaptation effect for conventional disaster mitigation efforts, was developed based on historical vulnerability values derived from flood damage records and a river inundation simulation. Coupled with general circulation model outputs and future socioeconomic scenarios, potential future flood fatalities and economic loss were estimated. By including the effect of autonomous adaptation, our multimodel ensemble estimates projected a 2.0% decrease in potential flood fatalities and an 821% increase in potential economic losses by 2100 under the highest emission scenario together with a large population increase. Vulnerability changes reduced potential flood consequences by 64%-72% in terms of potential fatalities and 28%-42% in terms of potential economic losses by 2100. Although socioeconomic changes made the greatest contribution to the potential increased consequences of future floods, about a half of the increase of potential economic losses was mitigated by autonomous adaptation. There is a clear and positive relationship between the global temperature increase from the pre-industrial level and the estimated mean potential flood economic loss, while there is a negative relationship with potential fatalities due to the autonomous adaptation effect. A bootstrapping analysis suggests a significant increase in potential flood fatalities (+5.7%) without any adaptation if the temperature increases by 1.5 °C-2.0 °C, whereas the increase in potential economic loss (+0.9%) was not significant. Our method enables the effects of autonomous adaptation and additional adaptation efforts on climate-induced hazards to be distinguished, which would be essential for the accurate estimation of the cost of adaptation to

  4. Method of improving heterogeneous oil reservoir polymer flooding effect by positively-charged gel profile control

    Science.gov (United States)

    Zhao, Ling; Xia, Huifen

    2018-01-01

    The project of polymer flooding has achieved great success in Daqing oilfield, and the main oil reservoir recovery can be improved by more than 15%. But, for some strong oil reservoir heterogeneity carrying out polymer flooding, polymer solution will be inefficient and invalid loop problem in the high permeability layer, then cause the larger polymer volume, and a significant reduction in the polymer flooding efficiency. Aiming at this problem, it is studied the method that improves heterogeneous oil reservoir polymer flooding effect by positively-charged gel profile control. The research results show that the polymer physical and chemical reaction of positively-charged gel with the residual polymer in high permeability layer can generate three-dimensional network of polymer, plugging high permeable layer, and increase injection pressure gradient, then improve the effect of polymer flooding development. Under the condition of the same dosage, positively-charged gel profile control can improve the polymer flooding recovery factor by 2.3∼3.8 percentage points. Under the condition of the same polymer flooding recovery factor increase value, after positively-charged gel profile control, it can reduce the polymer volume by 50 %. Applying mechanism of positively-charged gel profile control technology is feasible, cost savings, simple construction, and no environmental pollution, therefore has good application prospect.

  5. The dynamic capacity calculation method and the flood control ability of the Three Gorges Reservoir

    Science.gov (United States)

    Zhang, Shanghong; Jing, Zhu; Yi, Yujun; Wu, Yu; Zhao, Yong

    2017-12-01

    To evaluate the flood control ability of a river-type reservoir, an accurate simulation method for the flood storage, discharge process, and dynamic capacity of the reservoir is important. As the world's largest reservoir, the storage capacity and flood control capacity of the Three Gorges Reservoir (TGR) has attracted widespread interest and academic debate for nearly 20 years. In this study, a model for calculating the dynamic capacity of a river-type reservoir is established based on data from 394 river cross sections and 2.5-m resolution digital elevation model (DEM) data of the TGR area. The storage capacity and flood control capacity of the TGR were analysed based on the scheduling procedures of a normal impoundment period. The results show that the static capacity of the TGR is 43.43 billion m3, the dynamic flood control capacity is 22.45 billion m3, and the maximum floodwater flow regulated by the dynamic capacity at Zhicheng is no more than 67,700 m3/s. This study supply new simulation method and up-to-date high-precision data to discuss the 20 years debate, and the results reveal the TGR design is conservative for flood control according to the Preliminary Design Report of the Three Gorges Project. The dynamic capacity calculation method used here can provide a reference for flood regulation of large river-type reservoirs.

  6. Projected large flood event sensitivity to projection selection and temporal downscaling methodology

    Energy Technology Data Exchange (ETDEWEB)

    Raff, D. [U.S. Dept. of the Interior, Bureau of Reclamation, Denver, Colorado (United States)

    2008-07-01

    Large flood events, that influence regulatory guidelines as well as safety of dams decisions, are likely to be affected by climate change. This talk will evaluate the use of climate projections downscaled and run through a rainfall - runoff model and its influence on large flood events. The climate spatial downscaling is performed statistically and a re-sampling and scaling methodology is used to temporally downscale from monthly to daily signals. The signals are run through a National Weather Service operational rainfall-runoff model to produce 6-hour flows. The flows will be evaluated for changes in large events at look-ahead horizons from 2011 - 2040, 2041 - 2070, and 2071 - 2099. The sensitivity of results will be evaluated with respect to projection selection criteria and re-sampling and scaling criteria for the Boise River in Idaho near Lucky Peak Dam. (author)

  7. Projected large flood event sensitivity to projection selection and temporal downscaling methodology

    International Nuclear Information System (INIS)

    Raff, D.

    2008-01-01

    Large flood events, that influence regulatory guidelines as well as safety of dams decisions, are likely to be affected by climate change. This talk will evaluate the use of climate projections downscaled and run through a rainfall - runoff model and its influence on large flood events. The climate spatial downscaling is performed statistically and a re-sampling and scaling methodology is used to temporally downscale from monthly to daily signals. The signals are run through a National Weather Service operational rainfall-runoff model to produce 6-hour flows. The flows will be evaluated for changes in large events at look-ahead horizons from 2011 - 2040, 2041 - 2070, and 2071 - 2099. The sensitivity of results will be evaluated with respect to projection selection criteria and re-sampling and scaling criteria for the Boise River in Idaho near Lucky Peak Dam. (author)

  8. How do local stakeholders respond to the uncertain implications of an innovative flood infrastructure project?

    Science.gov (United States)

    van den Hoek, Ronald; Brugnach, Marcela; Hoekstra, Arjen

    2013-04-01

    In the 20th century, flood management was dominated by rigid structures - such as dikes and dams - which intend to strictly regulate and control water systems. Although the application of these rigid structures has been successful in the recent past, their negative implications for ecosystems and natural processes is often not properly taken into account. Therefore, flood management practices are currently moving towards more nature-inclusive approaches. Building with Nature (BwN) is such a new approach of nature-inclusive flood management in the Netherlands, which aims to utilize natural dynamics (e.g., wind and currents) and natural materials (e.g., sediment and vegetation) for the realization of effective flood infrastructure, while providing opportunities for nature development. However, the natural dynamics driving a project based on BwN design principles are inherently unpredictable. Furthermore, our factual knowledge base regarding the socio-ecological system in which the BwN initiative is implemented is incomplete. Moreover, in recent years, it is increasingly aimed for by decision-makers to involve local stakeholders in the development of promising flood management initiatives. These stakeholders and other actors involved can have diverging views regarding the project, can perceive unanticipated implications and could choose unforeseen action paths. In short, while a project based on BwN design principles - like any human intervention - definitely has implications for the socio-ecological system, both the extent to which these particular implications will occur and the response of stakeholders are highly uncertain. In this paper, we study the Safety Buffer Oyster Dam case - a BwN pilot project - and address the interplay between the project's implications, the uncertainties regarding these implications and the action paths chosen by the local stakeholders and project team. We determine how the implications of the Safety Buffer project are viewed by local

  9. Multi-Model Projections of River Flood Risk in Europe under Global Warming

    Directory of Open Access Journals (Sweden)

    Lorenzo Alfieri

    2018-01-01

    Full Text Available Knowledge on the costs of natural disasters under climate change is key information for planning adaptation and mitigation strategies of future climate policies. Impact models for large scale flood risk assessment have made leaps forward in the past few years, thanks to the increased availability of high resolution climate projections and of information on local exposure and vulnerability to river floods. Yet, state-of-the-art flood impact models rely on a number of input data and techniques that can substantially influence their results. This work compares estimates of river flood risk in Europe from three recent case studies, assuming global warming scenarios of 1.5, 2, and 3 degrees Celsius from pre-industrial levels. The assessment is based on comparing ensemble projections of expected damage and population affected at country level. Differences and common points between the three cases are shown, to point out main sources of uncertainty, strengths, and limitations. In addition, the multi-model comparison helps identify regions with the largest agreement on specific changes in flood risk. Results show that global warming is linked to substantial increase in flood risk over most countries in Central and Western Europe at all warming levels. In Eastern Europe, the average change in flood risk is smaller and the multi-model agreement is poorer.

  10. Design and Flood Control Assessment of 5MWp Fishing and Photovoltaic Power Project in Xinghua City

    Science.gov (United States)

    Guo, Liuchao; Hu, Xiaodong; Su, Yuyan; Wu, Peipei; Weng, Songgan

    2017-12-01

    In order to reduce coal consumption in Jiangsu Province and develop new energy sources, considering on the distribution of geology, solar energy resources, traffic and grid connection in Xinghua City, the aim is to determine the configuration of photovoltaic modules and photovoltaic array tracking mode, design photovoltaic array and layout scheme. But the project is a wading project, it is built in Dong Tan Lake polder I115, it needs scientific and reasonable evaluation to the effect of Dong Tan Lake’s flood storage and discharge. The results can provide guidance for similar engineering’s design.

  11. Flooding from Intense Rainfall: an overview of project SINATRA

    Science.gov (United States)

    Cloke, Hannah

    2014-05-01

    Project SINATRA (Susceptibility of catchments to INTense RAinfall and flooding) is part of the UK NERC's Flooding From Intense Rainfall (FFIR) research programme which aims to reduce the risks of damage and loss of life caused by surface water and flash floods through improved identification, characterisation and prediction of interacting meteorological, hydrological and hydro-morphological processes that contribute to flooding associated with high-intensity rainfall events. Extreme rainfall events may only last for a few hours at most, but can generate terrifying and destructive floods. Their impact can be affected by a wide range factors (or processes) such as the location and intensity of the rainfall, the shape and steepness of the catchment it falls on, how much sediment is moved by the water and the vulnerability of the communities in the flood's path. Furthermore, FFIR are by their nature rapid, making it very difficult for researchers to 'capture' measurements during events. The complexity, speed and lack of field measurements on FFIR make it difficult to create computer models to predict flooding and often we are uncertain as to their accuracy. In addition there is no consensus on how to identify how particular catchments may be vulnerable to FFIR, due to factors such as catchment area, shape, geology and soil type as well as land-use. Additionally, the catchments most susceptible to FFIR are often small and un-gauged. Project SINATRA will: (1) Increase our understanding of what factors cause FFIR and gathering new, high resolution measurements of FFIR by: assembling an archive of past FFIR events in Britain and their impacts, as a prerequisite for improving our ability to predict future occurrences of FFIR; making real time observations of flooding during flood events as well as post-event surveys and historical event reconstruction, using fieldwork and crowd-sourcing methods; and characterizing the physical drivers for UK summer flooding events by

  12. Managing uncertainty in flood protection planning with climate projections

    Directory of Open Access Journals (Sweden)

    B. Dittes

    2018-04-01

    Full Text Available Technical flood protection is a necessary part of integrated strategies to protect riverine settlements from extreme floods. Many technical flood protection measures, such as dikes and protection walls, are costly to adapt after their initial construction. This poses a challenge to decision makers as there is large uncertainty in how the required protection level will change during the measure lifetime, which is typically many decades long. Flood protection requirements should account for multiple future uncertain factors: socioeconomic, e.g., whether the population and with it the damage potential grows or falls; technological, e.g., possible advancements in flood protection; and climatic, e.g., whether extreme discharge will become more frequent or not. This paper focuses on climatic uncertainty. Specifically, we devise methodology to account for uncertainty associated with the use of discharge projections, ultimately leading to planning implications. For planning purposes, we categorize uncertainties as either visible, if they can be quantified from available catchment data, or hidden, if they cannot be quantified from catchment data and must be estimated, e.g., from the literature. It is vital to consider the hidden uncertainty, since in practical applications only a limited amount of information (e.g., a finite projection ensemble is available. We use a Bayesian approach to quantify the visible uncertainties and combine them with an estimate of the hidden uncertainties to learn a joint probability distribution of the parameters of extreme discharge. The methodology is integrated into an optimization framework and applied to a pre-alpine case study to give a quantitative, cost-optimal recommendation on the required amount of flood protection. The results show that hidden uncertainty ought to be considered in planning, but the larger the uncertainty already present, the smaller the impact of adding more. The recommended planning is

  13. Managing uncertainty in flood protection planning with climate projections

    Science.gov (United States)

    Dittes, Beatrice; Špačková, Olga; Schoppa, Lukas; Straub, Daniel

    2018-04-01

    Technical flood protection is a necessary part of integrated strategies to protect riverine settlements from extreme floods. Many technical flood protection measures, such as dikes and protection walls, are costly to adapt after their initial construction. This poses a challenge to decision makers as there is large uncertainty in how the required protection level will change during the measure lifetime, which is typically many decades long. Flood protection requirements should account for multiple future uncertain factors: socioeconomic, e.g., whether the population and with it the damage potential grows or falls; technological, e.g., possible advancements in flood protection; and climatic, e.g., whether extreme discharge will become more frequent or not. This paper focuses on climatic uncertainty. Specifically, we devise methodology to account for uncertainty associated with the use of discharge projections, ultimately leading to planning implications. For planning purposes, we categorize uncertainties as either visible, if they can be quantified from available catchment data, or hidden, if they cannot be quantified from catchment data and must be estimated, e.g., from the literature. It is vital to consider the hidden uncertainty, since in practical applications only a limited amount of information (e.g., a finite projection ensemble) is available. We use a Bayesian approach to quantify the visible uncertainties and combine them with an estimate of the hidden uncertainties to learn a joint probability distribution of the parameters of extreme discharge. The methodology is integrated into an optimization framework and applied to a pre-alpine case study to give a quantitative, cost-optimal recommendation on the required amount of flood protection. The results show that hidden uncertainty ought to be considered in planning, but the larger the uncertainty already present, the smaller the impact of adding more. The recommended planning is robust to moderate changes in

  14. Building Adjustable Pre-storm Reservoir Flood-control Release Rules

    Science.gov (United States)

    Yang, Shun-Nien; Chang, Li-Chiu; Chang, Fi-John; Hsieh, Cheng-Daw

    2017-04-01

    Typhoons hit Taiwan several times every year, which could cause serious flood disasters. Because mountainous terrains and steep landforms can rapidly accelerate the speed of flood flow during typhoon events, rivers cannot be a stable source of water supply. Reservoirs become the most effective floodwater storage facilities for alleviating flood damages in Taiwan. The pre-storm flood-control release can significantly increase reservoir storage capacity available to store floodwaters for reducing downstream flood damage, while the uncertainties of total forecasted rainfalls are very high in different stages of an oncoming typhoon, which may cause the risk of water shortage in the future. This study proposes adjustable pre-storm reservoir flood-control release rules in three designed operating stages with various hydrological conditions in the Feitsui Reservoir, a pivot reservoir for water supply to Taipei metropolitan in Taiwan, not only to reduce the risk of reservoir flood control and downstream flooding but also to consider water supply. The three operating stages before an oncoming typhoon are defined upon the timings when: (1) typhoon news is issued (3-7days before typhoon hit); (2) the sea warning is issued (2-4 days before typhoon hit); and (3) the land warning is issued (1-2 days before typhoon hit). We simulate 95 historical typhoon events with 3000 initial water levels and build some pre-storm flood-control release rules to adjust the amount of pre-release based on the total forecasted rainfalls at different operating stages. A great number of simulations (68.4 millions) are conducted to extract their major consequences and then build the adjustable pre-storm reservoir flood-control release rules. Accordingly, given a total forecasted rainfall and a water level, reservoir decision makers can easily identify the corresponding rule to tell the amount of pre-release in any stage. The results show that the proposed adjustable pre-release rules can effectively

  15. UNEXMIN H2020 Project: an underwater explorer for flooded mines

    Science.gov (United States)

    Lopes, Luís; Zajzon, Norbert; Bodo, Balázs; Henley, Stephen; Žibret, Gorazd; Almeida, José; Vörös, Csaba; Horvath, Janos; Dizdarevič, Tatjana; Rossi, Claudio; McLoughlin, Mike

    2017-04-01

    UNEXMIN (Underwater Explorer for Flooded Mines, Grant Agreement No. 690008, www.unexmin.eu) is a project funded by the European Commission's HORIZON2020 Framework Programme. The project is developing a multi-platform robotic system for the autonomous exploration and mapping of Europe's flooded mines. The robotic system - UX-1 - will use non-invasive methods for the 3D mapping of abandoned flooded mines, bringing new important geological and mineralogical data that cannot be currently obtained by any other means. This technology will allow the development or update of geological models at local and regional levels. The data collected will then be used to consider new exploration scenarios for the possible re-opening of some of Europe's abandoned mines which may still contain valuable resources of strategic minerals. The deployment of a multi-robotic system in such a confined environment poses challenges that must be overcome so that the robots can work autonomously, without damaging the equipment and the mine itself. Key challenges are related to the i) structural design for robustness and resilience, ii) localization, navigation and 3D mapping, iii) guidance, propulsion and control, iv) autonomous operation and supervision, v) data processing, interpretation and evaluation. The scientific instrument array is currently being tested, built and tailored for the submersible: pH, electrical conductivity, pressure and temperature analyzers and a water sampler (water sampling methods), a magnetic field analyzer, a gamma-ray counter and a sub-bottom profiler (geophysical methods) and a multispectral and UV fluorescence imaging units (optical observation methods). The instruments have been selected to generate data of maximum geoscientific interest, considering the limiting factors of the submerged underground environment, the necessary robotic functions, the size for the robot and other constraints. Other crucial components for the robot's functionality (such as movement

  16. 33 CFR 203.42 - Inspection of non-Federal flood control works.

    Science.gov (United States)

    2010-07-01

    ... PROCEDURES Rehabilitation Assistance for Flood Control Works Damaged by Flood or Coastal Storm: The Corps Rehabilitation and Inspection Program § 203.42 Inspection of non-Federal flood control works. (a) Required... will conduct an IEI to determine if the flood control work meets minimum engineering and maintenance...

  17. Polders as active element of flood control

    International Nuclear Information System (INIS)

    Zilavy, M.

    2004-01-01

    In this presentation author deals with use of the polders as active element of flood control on the example Kysuca River and Podluzianka River (Slovakia). It was concluded that it is necessary: - dense network of rain gauge stations; - network of water level recorders; revision of design process for hydraulic objects - degree of safety; changes in legislation - permission for construction in flood-plains; maintenance of channel capacity; early flood forecasting - forecasting and warning service; river training works and maintenance; design of retention areas; preparation of retention areas prior to flood propagation

  18. Improved Efficiency of Miscible CO2 Floods and Enhanced Prospects for CO2 Flooding Heterogeneous Reservoirs

    Energy Technology Data Exchange (ETDEWEB)

    Grigg, Reid B.; Schechter, David S.

    1999-10-15

    The goal of this project is to improve the efficiency of miscible CO2 floods and enhance the prospects for flooding heterogeneous reservoirs. This report provides results of the second year of the three-year project that will be exploring three principles: (1) Fluid and matrix interactions (understanding the problems). (2) Conformance control/sweep efficiency (solving the problems. 3) Reservoir simulation for improved oil recovery (predicting results).

  19. Combining information from multiple flood projections in a hierarchical Bayesian framework

    Science.gov (United States)

    Le Vine, Nataliya

    2016-04-01

    This study demonstrates, in the context of flood frequency analysis, the potential of a recently proposed hierarchical Bayesian approach to combine information from multiple models. The approach explicitly accommodates shared multimodel discrepancy as well as the probabilistic nature of the flood estimates, and treats the available models as a sample from a hypothetical complete (but unobserved) set of models. The methodology is applied to flood estimates from multiple hydrological projections (the Future Flows Hydrology data set) for 135 catchments in the UK. The advantages of the approach are shown to be: (1) to ensure adequate "baseline" with which to compare future changes; (2) to reduce flood estimate uncertainty; (3) to maximize use of statistical information in circumstances where multiple weak predictions individually lack power, but collectively provide meaningful information; (4) to diminish the importance of model consistency when model biases are large; and (5) to explicitly consider the influence of the (model performance) stationarity assumption. Moreover, the analysis indicates that reducing shared model discrepancy is the key to further reduction of uncertainty in the flood frequency analysis. The findings are of value regarding how conclusions about changing exposure to flooding are drawn, and to flood frequency change attribution studies.

  20. Deep Uncertainty Surrounding Coastal Flood Risk Projections: A Case Study for New Orleans

    Science.gov (United States)

    Wong, Tony E.; Keller, Klaus

    2017-10-01

    Future sea-level rise drives severe risks for many coastal communities. Strategies to manage these risks hinge on a sound characterization of the uncertainties. For example, recent studies suggest that large fractions of the Antarctic ice sheet (AIS) may rapidly disintegrate in response to rising global temperatures, leading to potentially several meters of sea-level rise during the next few centuries. It is deeply uncertain, for example, whether such an AIS disintegration will be triggered, how much this would increase sea-level rise, whether extreme storm surges intensify in a warming climate, or which emissions pathway future societies will choose. Here, we assess the impacts of these deep uncertainties on projected flooding probabilities for a levee ring in New Orleans, LA. We use 18 scenarios, presenting probabilistic projections within each one, to sample key deeply uncertain future projections of sea-level rise, radiative forcing pathways, storm surge characterization, and contributions from rapid AIS mass loss. The implications of these deep uncertainties for projected flood risk are thus characterized by a set of 18 probability distribution functions. We use a global sensitivity analysis to assess which mechanisms contribute to uncertainty in projected flood risk over the course of a 50-year design life. In line with previous work, we find that the uncertain storm surge drives the most substantial risk, followed by general AIS dynamics, in our simple model for future flood risk for New Orleans.

  1. Improved Efficiency of Miscible CO2 Floods and Enhanced Prospects for CO2 Flooding Heterogeneous Reservoirs; ANNUAL

    International Nuclear Information System (INIS)

    Grigg, Reid B.; Schechter, David S.

    1999-01-01

    The goal of this project is to improve the efficiency of miscible CO2 floods and enhance the prospects for flooding heterogeneous reservoirs. This report provides results of the second year of the three-year project that will be exploring three principles: (1) Fluid and matrix interactions (understanding the problems). (2) Conformance control/sweep efficiency (solving the problems. 3) Reservoir simulation for improved oil recovery (predicting results)

  2. A Comparison of Flood Control Standards for Reservoir Engineering for Different Countries

    Directory of Open Access Journals (Sweden)

    Minglei Ren

    2017-02-01

    Full Text Available Across the globe, flood control standards for reservoir engineering appear different due to various deciding factors such as flood features, society, economy, culture, morality, politics, and technology resources, etc. This study introduces an in-depth comparison of flood control standards for reservoir engineering for different countries. After the comparison and analysis, it is concluded that the determination of flood control standards is related to engineering grade, dam type, dam height, and the hazard to downstream after dam-breaking, etc. Each country should adopt practical flood control standards according to the characteristics of local reservoir engineering. The constitutive flood control standards should retain certain flexibility in the basis of constraint force. This review could offer a reference for developing countries in the enactment of flood control standards for reservoir engineering.

  3. Flood risk analysis for flood control and sediment transportation in sandy regions: A case study in the Loess Plateau, China

    Science.gov (United States)

    Guo, Aijun; Chang, Jianxia; Wang, Yimin; Huang, Qiang; Zhou, Shuai

    2018-05-01

    Traditional flood risk analysis focuses on the probability of flood events exceeding the design flood of downstream hydraulic structures while neglecting the influence of sedimentation in river channels on regional flood control systems. This work advances traditional flood risk analysis by proposing a univariate and copula-based bivariate hydrological risk framework which incorporates both flood control and sediment transport. In developing the framework, the conditional probabilities of different flood events under various extreme precipitation scenarios are estimated by exploiting the copula-based model. Moreover, a Monte Carlo-based algorithm is designed to quantify the sampling uncertainty associated with univariate and bivariate hydrological risk analyses. Two catchments located on the Loess plateau are selected as study regions: the upper catchments of the Xianyang and Huaxian stations (denoted as UCX and UCH, respectively). The univariate and bivariate return periods, risk and reliability in the context of uncertainty for the purposes of flood control and sediment transport are assessed for the study regions. The results indicate that sedimentation triggers higher risks of damaging the safety of local flood control systems compared with the event that AMF exceeds the design flood of downstream hydraulic structures in the UCX and UCH. Moreover, there is considerable sampling uncertainty affecting the univariate and bivariate hydrologic risk evaluation, which greatly challenges measures of future flood mitigation. In addition, results also confirm that the developed framework can estimate conditional probabilities associated with different flood events under various extreme precipitation scenarios aiming for flood control and sediment transport. The proposed hydrological risk framework offers a promising technical reference for flood risk analysis in sandy regions worldwide.

  4. Flood management selections for the Yangtze River midstream after the Three Gorges Project operation

    Science.gov (United States)

    Fang, Hongwei; Han, Dong; He, Guojian; Chen, Minghong

    2012-04-01

    SummaryAfter the Yangtze River was closed by the Three Gorges Project (TGP) in 2003, erosion occurred from the dam site to the river mouth, especially in the middle and lower reaches of the Yangtze River. However, in some local areas of Chenglingji reach which holds the key position for flood management, there is actually deposition in contrast to the expected erosion. In this paper, a one dimensional mathematical model of the river network with sediment transport is used as the tool to simulate flow and fluvial processes. The calculation domain is from Yichang, which is downstream of the dam, to Hankou, the controlling node of flood management, 694 km long in total. The model is calibrated based on the field data of hydrology and sediment transport during the period from October 2003 to October 2008. Then the model is utilized to simulate the erosion and deposition of the middle and lower reaches of the Yangtze River in the next two decades, and produce the results of a new river channel after river bed deformation occurs. The typical flood processes of 1954 and 1998 in the Yangtze River basin are used to check the flood management scheme for the research area, and results show that water storage of Three Gorges Reservoir (TGR) and a flood diversion program downstream of the Yangtze River should be taken into consideration.

  5. Floods of the Past, Design of Tomorrow - Project Introduction

    NARCIS (Netherlands)

    Cohen, K.M.; Schielen, R.; van der Meulen, B.; Bomers, A.; Hulscher, S.J.M.H.; Middelkoop, H.

    2016-01-01

    A joint research project (two PhD’s, 2016-2020) has been granted to Utrecht University and the University of Twente, on the topic of detailed hydraulic modelling of selected largest-known historic river floods affecting the Lower Rhine valley and delta (The Netherlands and adjacent Germany). Besides

  6. Impact of water control projects on fisheries resources in Bangladesh

    Science.gov (United States)

    Mirza, Monirul Qader; Ericksen, Neil J.

    1996-07-01

    Bangladesh is a very flat delta built up by the Ganges—Brahmaputra—Meghna/Barak river systems. Because of its geographical location, floods cause huge destruction of lives and properties almost every year. Water control programs have been undertaken to enhance development through mitigating the threat of disasters. This structural approach to flood hazard has severely affected floodplain fisheries that supply the major share of protein to rural Bangladesh, as exemplified by the Chandpur Irrigation Project. Although the regulated environment of the Chandpur project has become favorable for closed-water cultured fish farming, the natural open-water fishery loss has been substantial. Results from research show that fish yields were better under preproject conditions. Under project conditions per capita fish consumption has dropped significantly, and the price of fish has risen beyond the means of the poor people, so that fish protein in the diet of poor people is gradually declining. Bangladesh is planning to expand water control facilities to the remaining flood-prone areas in the next 15 20 years. This will cause further loss of floodplain fisheries. If prices for closed-water fish remain beyond the buying power of the poor, alternative sources of cheap protein will be required.

  7. The AVI project: A bibliographical and archive inventory of landslides and floods in Italy

    Science.gov (United States)

    Guzzetti, Fausto; Cardinali, Mauro; Reichenbach, Paola

    1994-07-01

    The AVI project was commissioned by the Minister of Civil Protection to the National Group for Prevention of Hydrogeologic Hazards to complete an inventory of areas historically affected by landslides and floods in Italy. More than 300 people, divided into 15 research teams and two support groups, worked for one year on the project. Twenty-two journals were systematically searched for the period 1918 1990, 350,000 newspaper issues were screened, and 39,953 articles were collected. About 150 experts on mass movement and floods were interviewed and 1482 published and unpublished technical and scientific reports were reviewed. The results of the AVI project, in spite of the limitations, represent the most comprehensive archiving of mass movement and floods ever prepared in Italy. The type and quality of the information collected and the methodologies and techniques used to make the inventory are discussed. Possible applications and future developments are also presented.

  8. Advances in flash floods understanding and modelling derived from the FloodScale project in South-East France

    Directory of Open Access Journals (Sweden)

    Braud Isabelle

    2016-01-01

    Full Text Available The Mediterranean area is prone to intense rainfall events triggering flash floods, characterized by very short response times that sometimes lead to dramatic consequences in terms of casualties and damages. These events can affect large territories, but their impact may be very local in catchments that are generally ungauged. These events remain difficult to predict and the processes leading to their generation still need to be clarified. The HyMeX initiative (Hydrological Cycle in the Mediterranean Experiment, 2010-2020 aims at increasing our understanding of the water cycle in the Mediterranean basin, in particular in terms of extreme events. In order to better understand processes leading to flash floods, a four-year experiment (2012-2015 was conducted in the Cévennes region (South-East France as part of the FloodScale project. Both continuous and opportunistic measurements during floods were conducted in two large catchments (Ardèche and Gard rivers with nested instrumentation from the hillslopes to catchments of about 1, 10, 100 to 1000 km2 covering contrasted geology and land use. Continuous measurements include distributed rainfall, stream water level, discharge, water temperature and conductivity and soil moisture measurements. Opportunistic measurements include surface soil moisture and geochemistry sampling during events and gauging of floods using non-contact methods: portable radars to measure surface water velocity or image sequence analysis using LS-PIV (Large Scale Particle Image Velocimetry. During the period 2012-2014, and in particular during autumn 2014, several intense events affected the catchments and provided very rich data sets. Data collection was complemented with modelling activity aiming at simulating observed processes. The modelling strategy was setup through a wide range of scales, in order to test hypotheses about physical processes at the smallest scales, and aggregated functioning hypothesis at the largest

  9. Joint projections of sea level and storm surge using a flood index

    Science.gov (United States)

    Little, C. M.; Lin, N.; Horton, R. M.; Kopp, R. E.; Oppenheimer, M.

    2016-02-01

    Capturing the joint influence of sea level rise (SLR) and tropical cyclones (TCs) on future coastal flood risk poses significant challenges. To address these difficulties, Little et al. (2015) use a proxy of tropical cyclone activity and a probabilistic flood index that aggregates flood height and duration over a wide area (the US East and Gulf coasts). This technique illuminates the individual impacts of TCs and SLR and their correlation across different coupled climate models. By 2080-2099, changes in the flood index relative to 1986-2005 are substantial and positively skewed: a 10th-90th percentile range of 35-350x higher for a high-end business-as-usual emissions scenario (see figure). This aggregated flood index: 1) is a means to consistently combine TC-driven storm surges and SLR; 2) provides a more robust description of historical surge-climate relationships than is available at any one location; and 3) allows the incorporation of a larger climate model ensemble - which is critical to uncertainty characterization. It does not provide a local view of the complete spectrum of flood severity (i.e. return curves). However, alternate techniques that provide localized return curves (e.g. Lin et al., 2012) are computationally intensive, limiting the set of large-scale climate models that can be incorporated, and require several linked statistical and dynamical models, each with structural uncertainties that are difficult to quantify. Here, we present the results of Little et al. (2015) along with: 1) alternate formulations of the flood index; 2) strategies to localize the flood index; and 3) a comparison of flood index projections to those provided by model-based return curves. We look to this interdisciplinary audience for feedback on the advantages and disadvantages of each tool for coastal planning and decision-making. Lin, N., K. Emanuel, M. Oppenheimer, and E. Vanmarcke, 2012: Physically based assessment of hurricane surge threat under climate change. Nature

  10. Moving out or living on a mound? Jointly planning a Dutch flood adaptation project

    NARCIS (Netherlands)

    Roth, D.; Winnubst, M.

    2014-01-01

    All over the world spatial flood risk management policies are on the rise. This paper analyses the planning process for the Overdiepse polder, a so-called “Room for the River” project in the Netherlands. After high water in the 1990s, the Dutch government changed its flood risk management policy.

  11. Communication and flood risk awareness in the framework of DRIHM project

    Science.gov (United States)

    Llasat, Maria-Carmen; Llasat-Botija, Montserrat; Gilabert, Joan; Marcos, Raül; Parodi, Antonio; Rebora, Nicola; Garrote, Luís

    2014-05-01

    introducing some explanations to understand the situation, as well as to recommend scientific lectures or show new achievements. This work has been developed in the framework of the "FP7 DRIHM (Distributed Research Infrastructure for Hydro-Meteorology, www.drihm.eu) project that intends to develop a prototype e-Science environment to facilitate this collaboration and provide end-to-end hydrometeorological services (models, datasets and post-processing tools) at the European level, with the ability to expand to global scale. The objectives of DRIHM are to lead the definition of a common long-term strategy, to foster the development of new HMR models and observational archives for the study of severe hydrometeorological events, to promote the execution and analysis of high-end simulations, and to support the dissemination of predictive models as decision analysis tools. The project also aims to give students and professionals some tools to simulate flood events by combining different meteorological models with different hydrological models. Some of the cases of study are also used as an example for the communication tools, which includes, besides those previously showed, a newsletter and some videos.

  12. Real-Time Optimal Flood Control Decision Making and Risk Propagation Under Multiple Uncertainties

    Science.gov (United States)

    Zhu, Feilin; Zhong, Ping-An; Sun, Yimeng; Yeh, William W.-G.

    2017-12-01

    Multiple uncertainties exist in the optimal flood control decision-making process, presenting risks involving flood control decisions. This paper defines the main steps in optimal flood control decision making that constitute the Forecast-Optimization-Decision Making (FODM) chain. We propose a framework for supporting optimal flood control decision making under multiple uncertainties and evaluate risk propagation along the FODM chain from a holistic perspective. To deal with uncertainties, we employ stochastic models at each link of the FODM chain. We generate synthetic ensemble flood forecasts via the martingale model of forecast evolution. We then establish a multiobjective stochastic programming with recourse model for optimal flood control operation. The Pareto front under uncertainty is derived via the constraint method coupled with a two-step process. We propose a novel SMAA-TOPSIS model for stochastic multicriteria decision making. Then we propose the risk assessment model, the risk of decision-making errors and rank uncertainty degree to quantify the risk propagation process along the FODM chain. We conduct numerical experiments to investigate the effects of flood forecast uncertainty on optimal flood control decision making and risk propagation. We apply the proposed methodology to a flood control system in the Daduhe River basin in China. The results indicate that the proposed method can provide valuable risk information in each link of the FODM chain and enable risk-informed decisions with higher reliability.

  13. 33 CFR 203.50 - Nonstructural alternatives to rehabilitation of flood control works.

    Science.gov (United States)

    2010-07-01

    ... rehabilitation of flood control works. 203.50 Section 203.50 Navigation and Navigable Waters CORPS OF ENGINEERS... DISASTER PROCEDURES Rehabilitation Assistance for Flood Control Works Damaged by Flood or Coastal Storm: The Corps Rehabilitation and Inspection Program § 203.50 Nonstructural alternatives to rehabilitation...

  14. Flood Risk, Flood Mitigation, and Location Choice: Evaluating the National Flood Insurance Program's Community Rating System.

    Science.gov (United States)

    Fan, Qin; Davlasheridze, Meri

    2016-06-01

    Climate change is expected to worsen the negative effects of natural disasters like floods. The negative impacts, however, can be mitigated by individuals' adjustments through migration and relocation behaviors. Previous literature has identified flood risk as one significant driver in relocation decisions, but no prior study examines the effect of the National Flood Insurance Program's voluntary program-the Community Rating System (CRS)-on residential location choice. This article fills this gap and tests the hypothesis that flood risk and the CRS-creditable flood control activities affect residential location choices. We employ a two-stage sorting model to empirically estimate the effects. In the first stage, individuals' risk perception and preference heterogeneity for the CRS activities are considered, while mean effects of flood risk and the CRS activities are estimated in the second stage. We then estimate heterogeneous marginal willingness to pay (WTP) for the CRS activities by category. Results show that age, ethnicity and race, educational attainment, and prior exposure to risk explain risk perception. We find significant values for the CRS-creditable mitigation activities, which provides empirical evidence for the benefits associated with the program. The marginal WTP for an additional credit point earned for public information activities, including hazard disclosure, is found to be the highest. Results also suggest that water amenities dominate flood risk. Thus, high amenity values may increase exposure to flood risk, and flood mitigation projects should be strategized in coastal regions accordingly. © 2015 Society for Risk Analysis.

  15. Hospital infection prevention and control issues relevant to extensive floods.

    Science.gov (United States)

    Apisarnthanarak, Anucha; Mundy, Linda M; Khawcharoenporn, Thana; Glen Mayhall, C

    2013-02-01

    The devastating clinical and economic implications of floods exemplify the need for effective global infection prevention and control (IPC) strategies for natural disasters. Reopening of hospitals after excessive flooding requires a balance between meeting the medical needs of the surrounding communities and restoration of a safe hospital environment. Postflood hospital preparedness plans are a key issue for infection control epidemiologists, healthcare providers, patients, and hospital administrators. We provide recent IPC experiences related to reopening of a hospital after extensive black-water floods necessitated hospital closures in Thailand and the United States. These experiences provide a foundation for the future design, execution, and analysis of black-water flood preparedness plans by IPC stakeholders.

  16. Modelling climate impact on floods under future emission scenarios using an ensemble of climate model projections

    Science.gov (United States)

    Wetterhall, F.; Cloke, H. L.; He, Y.; Freer, J.; Pappenberger, F.

    2012-04-01

    Evidence provided by modelled assessments of climate change impact on flooding is fundamental to water resource and flood risk decision making. Impact models usually rely on climate projections from Global and Regional Climate Models, and there is no doubt that these provide a useful assessment of future climate change. However, cascading ensembles of climate projections into impact models is not straightforward because of problems of coarse resolution in Global and Regional Climate Models (GCM/RCM) and the deficiencies in modelling high-intensity precipitation events. Thus decisions must be made on how to appropriately pre-process the meteorological variables from GCM/RCMs, such as selection of downscaling methods and application of Model Output Statistics (MOS). In this paper a grand ensemble of projections from several GCM/RCM are used to drive a hydrological model and analyse the resulting future flood projections for the Upper Severn, UK. The impact and implications of applying MOS techniques to precipitation as well as hydrological model parameter uncertainty is taken into account. The resultant grand ensemble of future river discharge projections from the RCM/GCM-hydrological model chain is evaluated against a response surface technique combined with a perturbed physics experiment creating a probabilisic ensemble climate model outputs. The ensemble distribution of results show that future risk of flooding in the Upper Severn increases compared to present conditions, however, the study highlights that the uncertainties are large and that strong assumptions were made in using Model Output Statistics to produce the estimates of future discharge. The importance of analysing on a seasonal basis rather than just annual is highlighted. The inability of the RCMs (and GCMs) to produce realistic precipitation patterns, even in present conditions, is a major caveat of local climate impact studies on flooding, and this should be a focus for future development.

  17. Projected increases in the annual flood pulse of the western Amazon

    Science.gov (United States)

    Zulkafli, Zed; Buytaert, Wouter; Manz, Bastian; Veliz Rosas, Claudia; Willems, Patrick; Lavado-Casimiro, Waldo; Guyot, Jean-Loup; Santini, William

    2016-04-01

    The impact of a changing climate on the Amazon basin is a subject of intensive research due to its rich biodiversity and the significant role of rain forest in carbon cycling. Climate change has also direct hydrological impact, and there have been increasing efforts to understand such dynamics at continental and subregional scales such as the scale of the western Amazon. New projections from the Coupled Model Inter- comparison Project Phase 5 (CMIP5) ensemble indicate consistent climatic warming and increasing seasonality of precipitation in the Peruvian Amazon basin. Here we use a distributed land surface model to quantify the potential impact of this change in the climate on the hydrological regime of the river. Using extremes value analysis, historical and future projections of the annual minimum, mean, and maximum river flows are produced for a range of return periods between 1 and 100 years. We show that the RCP 4.5 and 8.5 scenarios of climate change project an increased severity of the wet season flood pulse (7.5% and 12% increases respectively for the 100- year return floods). These findings are in agreement with previously projected increases in high extremes under the Special Report on Emissions Scenarios (SRES) climate projections, and are important to highlight due to the potential consequences on reproductive processes of in-stream species, swamp forest ecology, and socio-economy in the floodplain, amid a growing literature that more strongly emphasises future droughts and their impact on the viability of the rain forest system over the greater Amazonia.

  18. Economic optimisation of flood risk management projects

    NARCIS (Netherlands)

    Tsimopoulou, V.

    2015-01-01

    The Netherlands has developed a flood risk management policy based on an economic rationale. After the flood disaster of 1953, when a large area of the south-western part of the country was flooded and more than 1800 people lost their lives, the so-called Delta Committee was installed, whose main

  19. Flood effects on an Alaskan stream restoration project: the value of long-term monitoring

    Science.gov (United States)

    Densmore, Roseann V.; Karle, Kenneth F.

    2009-01-01

    On a nationwide basis, few stream restoration projects have long-term programs in place to monitor the effects of floods on channel and floodplain configuration and floodplain vegetation, but long-term and event-based monitoring is required to measure the effects of these stochastic events and to use the knowledge for adaptive management and the design of future projects. This paper describes a long-term monitoring effort (15 years) on a stream restoration project in Glen Creek in Denali National Park and Preserve in Alaska. The stream channel and floodplain of Glen Creek had been severely degraded over a period of 80 years by placer mining for gold, which left many reaches with unstable and incised streambeds without functioning vegetated floodplains. The objectives of the original project, initiated in 1991, were to develop and test methods for the hydraulic design of channel and floodplain morphology and for floodplain stabilization and riparian habitat recovery, and to conduct research and monitoring to provide information for future projects in similar degraded watersheds. Monitoring methods included surveyed stream cross-sections, vegetation plots, and aerial, ground, and satellite photos. In this paper we address the immediate and outlying effects of a 25-year flood on the stream and floodplain geometry and riparian vegetation. The long-term monitoring revealed that significant channel widening occurred following the flood, likely caused by excessive upstream sediment loading and the fairly slow development of floodplain vegetation in this climate. Our results illustrated design flaws, particularly in regard to identification and analysis of sediment sources and the dominant processes of channel adjustment.

  20. A method for projecting full-scale performance of CO/sub 2/ flooding in the Willard Unit

    International Nuclear Information System (INIS)

    Bilhartz, H.L.; Charlson, G.S.; Stalkup, F.I.; Miller, C.C.

    1985-01-01

    A non-producing CO/sub 2/ flood tertiary recovery test was recently completed in the Willard Unit of Wasson Field. Flood responses during waterflood and alternate injection of CO/sub 2/ and water were monitored at a logging observation well using compensated neutron and pulsed neutron logs. A pressure core was taken to measure residual oil saturations at the test conclusion. The overall objective of the testing was to obtain information for evaluating the potential for full-scale CO/sub 2/ flooding in the unit. Out method for making this evaluation involves: (1) defining CO/sub 2/ flood displacement efficiency and representing this efficiency in a miscible flood reservoir simulator; (2) defining a representative average reservoir description; and (3) projecting full-scale CO/sub 2/ flood performance with the simulator. The paper provides a status report on progress to assess CO/sub 2/ flooding potential for the Willard Unit in this manner

  1. Effectiveness of flood damage mitigation measures: Empirical evidence from French flood disasters

    NARCIS (Netherlands)

    Poussin, J.K.; Botzen, W.J.W.; Aerts, J.C.J.H.

    2015-01-01

    Recent destructive flood events and projected increases in flood risks as a result of climate change in many regions around the world demonstrate the importance of improving flood risk management. Flood-proofing of buildings is often advocated as an effective strategy for limiting damage caused by

  2. The Historical Flood Of July 2008 From Vaser River Basin, Romania. Causes, Effects And Flood Control Actions

    Directory of Open Access Journals (Sweden)

    Sima Andrei

    2015-10-01

    Full Text Available Floods is an experience perceived by society as unexpected, unexplainable and traumatizing and nowadays a threat to humanity more than ever. Among the natural phenomena which negatively affect human activities, floods are the ones which usually have the most significant consequences. The research, evaluations and statistics related to these phenomena do not reveal the drama and serious consequences that come with floods. It was proven that the increase of these extreme hydrological phenomena it is closely related to the anthropic activities from the area. Vaser basin is the most significant sub-basin of Vișeu river basin, contributing with 28% from the total flow of Vișeu river. Having a strong touristic and economic potential, the basin is often threatened by flash floods which usually have devastating effects. During July 2008 there was recorded the most significant flood from the history of hydrometric activity that led to substantial damage and death among locals. The present paper aims to analyze this historical flood, identifying the causes, effects, as well as the methods to control this extreme hydric phenomenon.

  3. Innovations in Stream Restoration and Flood Control Design Meeting Flood Capacity and Environmental Goals on San Luis Obispo Creek

    Science.gov (United States)

    Wayne Peterson

    1989-01-01

    Can a natural flowing creek be increased in drainage capacity to protect an adjacent community from flooding while still maintaining a natural habitat? San Luis Obispo constructed one such project on over a mile of Creek as a part of a housing development. The City found that some of the mitigation measures included in the project worked while others did not. In the...

  4. Cascade reservoir flood control operation based on risk grading and warning in the Upper Yellow River

    Science.gov (United States)

    Xuejiao, M.; Chang, J.; Wang, Y.

    2017-12-01

    Flood risk reduction with non-engineering measures has become the main idea for flood management. It is more effective for flood risk management to take various non-engineering measures. In this paper, a flood control operation model for cascade reservoirs in the Upper Yellow River was proposed to lower the flood risk of the water system with multi-reservoir by combining the reservoir flood control operation (RFCO) and flood early warning together. Specifically, a discharge control chart was employed to build the joint RFCO simulation model for cascade reservoirs in the Upper Yellow River. And entropy-weighted fuzzy comprehensive evaluation method was adopted to establish a multi-factorial risk assessment model for flood warning grade. Furthermore, after determining the implementing mode of countermeasures with future inflow, an intelligent optimization algorithm was used to solve the optimization model for applicable water release scheme. In addition, another model without any countermeasure was set to be a comparative experiment. The results show that the model developed in this paper can further decrease the flood risk of water system with cascade reservoirs. It provides a new approach to flood risk management by coupling flood control operation and flood early warning of cascade reservoirs.

  5. The Irma-sponge Project Frhymap: Flood Risk and Hydrological Mapping

    Science.gov (United States)

    Hoffmann, L.; Pfister, L.

    In the context of both increasing socio-economic developments in floodplains and the recent heavy floodings that have occurred in the Rhine and Meuse basins, the need for reliable hydro-climatological data, easily transposable hydrological and hydraulic models, as well as risk management tools has increased crucially. In the FRHYMAP project, some of these issues were addressed within a common mesoscale experimen- tal basin: the Alzette river basin, located in the Grand-duchy of Luxembourg. The various aspects concerning flooding events, reaching from the hydro-climatological analysis of field data to the risk assessment of socio-economic impacts, taking into account past and future climate and landuse changes were analysed by the six partici- pating research institutes (CREBS, L; CEREG, F; DLR, D; EPFL, CH; UB, D; VUB, B). Hydro-climatological data analysis over the past five decades has shown that in the study area, the increase in westerly and south-westerly atmospheric circulation patterns induced higher winter rainfall totals, leading to more frequent groundwater resurgences and ultimately also to higher daily maximum streamflow of the Alzette. The thus increased flood hazard has nonetheless a certain spatial variability, closely linked to the rainfall distribution patterns, which are strongly depending on the topo- graphical characteristics of the study area. Although the overall regime of the Alzette is more dependent on climate fluctuations, land use changes (mining activities, urbani- sation) had a marked effect on the rainfall-runoff relationship in some sub-basins over the last decades. By linking model parameters to physiographical basin characteris- tics, regionalised and thus easily transposable hydrological models were developed. Within a study area with very little long-term observation series, this technique, com- bined with the use of hydraulic models, allowed to define hydrological hazard pro- ducing and hydrological risk exposed areas. The

  6. FloodProBE: technologies for improved safety of the built environment in relation to flood events

    International Nuclear Information System (INIS)

    Ree, C.C.D.F. van; Van, M.A.; Heilemann, K.; Morris, M.W.; Royet, P.; Zevenbergen, C.

    2011-01-01

    The FloodProBE project started as a FP7 research project in November 2009. Floods, together with wind related storms, are considered the major natural hazard in the EU in terms of risk to people and assets. In order to adapt urban areas (in river and coastal zones) to prevent flooding or to be better prepared for floods, decision makers need to determine how to upgrade flood defences and increasing flood resilience of protected buildings and critical infrastructure (power supplies, communications, water, transport, etc.) and assess the expected risk reduction from these measures. The aim of the FloodProBE-project is to improve knowledge on flood resilience and flood protection performance for balancing investments in flood risk management in urban areas. To this end, technologies, methods and tools for assessment purposes and for the adaptation of new and existing buildings and critical infrastructure are developed, tested and disseminated. Three priority areas are addressed by FloodProBE. These are: (i) vulnerability of critical infrastructure and high-density value assets including direct and indirect damage, (ii) the assessment and reliability of urban flood defences including the use of geophysical methods and remote sensing techniques and (iii) concepts and technologies for upgrading weak links in flood defences as well as construction technologies for flood proofing buildings and infrastructure networks to increase the flood resilience of the urban system. The primary impact of FloodProBE in advancing knowledge in these areas is an increase in the cost-effectiveness (i.e. performance) of new and existing flood protection structures and flood resilience measures.

  7. Next generation paradigm for urban pluvial flood modelling, prediction, management and vulnerability reduction - Interaction between RainGain and Blue Green Dream projects

    Science.gov (United States)

    Maksimovic, C.

    2012-04-01

    The effects of climate change and increasing urbanisation call for a new paradigm for efficient planning, management and retrofitting of urban developments to increase resilience to climate change and to maximize ecosystem services. Improved management of urban floods from all sources in required. Time scale for well documented fluvial and coastal floods allows for timely response but surface (pluvial) flooding caused by intense local storms had not been given appropriate attention, Pitt Review (UK). Urban surface floods predictions require fine scale data and model resolutions. They have to be tackled locally by combining central inputs (meteorological services) with the efforts of the local entities. Although significant breakthrough in modelling of pluvial flooding was made there is a need to further enhance short term prediction of both rainfall and surface flooding. These issues are dealt with in the EU Iterreg project Rain Gain (RG). Breakthrough in urban flood mitigation can only be achieved by combined effects of advanced planning design, construction and management of urban water (blue) assets in interaction with urban vegetated areas' (green) assets. Changes in design and operation of blue and green assets, currently operating as two separate systems, is urgently required. Gaps in knowledge and technology will be introduced by EIT's Climate-KIC Blue Green Dream (BGD) project. The RG and BGD projects provide synergy of the "decoupled" blue and green systems to enhance multiple benefits to: urban amenity, flood management, heat island, biodiversity, resilience to drought thus energy requirements, thus increased quality of urban life at lower costs. Urban pluvial flood management will address two priority areas: Short Term rainfall Forecast and Short term flood surface forecast. Spatial resolution of short term rainfall forecast below 0.5 km2 and lead time of a few hours are needed. Improvements are achievable by combining data sources of raingauge networks

  8. Flood-proof motors

    Energy Technology Data Exchange (ETDEWEB)

    Schmitt, Marcus [AREVA NP GmbH, Erlangen (Germany)

    2013-07-01

    Even before the Fukushima event occurred some German nuclear power plants (NPP) have considered flooding scenarios. As a result of one of these studies, AREVA performed an upgrade project in NPP Isar 1 with flood-proof motors as a replacement of existing air-cooled low-voltage and high-voltage motors of the emergency cooling chain. After the Fukushima event, in which the cooling chains failed, the topic flood-proof equipment gets more and more into focus. This compact will introduce different kinds of flood-proof electrical motors which are currently installed or planned for installation into NPPs over the world. Moreover the process of qualification, as it was performed during the project in NPP Isar 1, will be shown. (orig.)

  9. Flood-proof motors

    International Nuclear Information System (INIS)

    Schmitt, Marcus

    2013-01-01

    Even before the Fukushima event occurred some German nuclear power plants (NPP) have considered flooding scenarios. As a result of one of these studies, AREVA performed an upgrade project in NPP Isar 1 with flood-proof motors as a replacement of existing air-cooled low-voltage and high-voltage motors of the emergency cooling chain. After the Fukushima event, in which the cooling chains failed, the topic flood-proof equipment gets more and more into focus. This compact will introduce different kinds of flood-proof electrical motors which are currently installed or planned for installation into NPPs over the world. Moreover the process of qualification, as it was performed during the project in NPP Isar 1, will be shown. (orig.)

  10. Integrating a Typhoon Event Database with an Optimal Flood Operation Model on the Real-Time Flood Control of the Tseng-Wen Reservoir

    Science.gov (United States)

    Chen, Y. W.; Chang, L. C.

    2012-04-01

    Typhoons which normally bring a great amount of precipitation are the primary natural hazard in Taiwan during flooding season. Because the plentiful rainfall quantities brought by typhoons are normally stored for the usage of the next draught period, the determination of release strategies for flood operation of reservoirs which is required to simultaneously consider not only the impact of reservoir safety and the flooding damage in plain area but also for the water resource stored in the reservoir after typhoon becomes important. This study proposes a two-steps study process. First, this study develop an optimal flood operation model (OFOM) for the planning of flood control and also applies the OFOM on Tseng-wun reservoir and the downstream plain related to the reservoir. Second, integrating a typhoon event database with the OFOM mentioned above makes the proposed planning model have ability to deal with a real-time flood control problem and names as real-time flood operation model (RTFOM). Three conditions are considered in the proposed models, OFOM and RTFOM, include the safety of the reservoir itself, the reservoir storage after typhoons and the impact of flooding in the plain area. Besides, the flood operation guideline announced by government is also considered in the proposed models. The these conditions and the guideline can be formed as an optimization problem which is solved by the genetic algorithm (GA) in this study. Furthermore, a distributed runoff model, kinematic-wave geomorphic instantaneous unit hydrograph (KW-GIUH), and a river flow simulation model, HEC-RAS, are used to simulate the river water level of Tseng-wun basin in the plain area and the simulated level is shown as an index of the impact of flooding. Because the simulated levels are required to re-calculate iteratively in the optimization model, applying a recursive artificial neural network (recursive ANN) instead of the HEC-RAS model can significantly reduce the computational burden of

  11. Impact of the Three-Gorges Dam and water transfer project on Changjiang floods

    Science.gov (United States)

    Nakayama, Tadanobu; Shankman, David

    2013-01-01

    Increasing frequency of severe floods on the middle and lower Changjiang (Yangtze) River during the past few decades can be attributed to both abnormal monsoon rainfall and landscape changes that include extensive deforestation affecting river sedimentation, and shrinking lakes and levee construction that reduced the areas available for floodwater storage. The Three-Gorges Dam (TGD) and the South-to-North Water Transfer Project (SNWTP) will also affect frequency and intensity of severe floods in the Poyang Lake region of the middle Changjiang. Process-based National Integrated Catchment-based Eco-hydrology (NICE) model predicts that the TGD will increase flood risk during the early summer monsoon against the original justifications for building the dam, relating to complex river-lake-groundwater interactions. Several scenarios predict that morphological change will increase flood risk around the lake. This indicates the importance of managing both flood discharge and sediment deposition for the entire basin. Further, the authors assessed the impact of sand mining in the lake after its prohibition on the Changjiang, and clarified that alternative scenario of sand mining in lakes currently disconnected from the mainstream would reduce the flood risk to a greater extent than intensive dredging along junction channel. Because dry biomasses simulated by the model were linearly related to the Time-Integrated Normalized Difference Vegetation Index (TINDVI) estimated from satellite images, its decadal gradient during 1982-1999 showed a spatially heterogeneous distribution and generally decreasing trends beside the lakes, indicating that the increases in lake reclamation and the resultant decrease in rice productivity are closely related to the hydrologic changes. This integrated approach could help to minimize flood damage and promote better decisions addressing sustainable development.

  12. Probable maximum flood control

    International Nuclear Information System (INIS)

    DeGabriele, C.E.; Wu, C.L.

    1991-11-01

    This study proposes preliminary design concepts to protect the waste-handling facilities and all shaft and ramp entries to the underground from the probable maximum flood (PMF) in the current design configuration for the proposed Nevada Nuclear Waste Storage Investigation (NNWSI) repository protection provisions were furnished by the United States Bureau of Reclamation (USSR) or developed from USSR data. Proposed flood protection provisions include site grading, drainage channels, and diversion dikes. Figures are provided to show these proposed flood protection provisions at each area investigated. These areas are the central surface facilities (including the waste-handling building and waste treatment building), tuff ramp portal, waste ramp portal, men-and-materials shaft, emplacement exhaust shaft, and exploratory shafts facility

  13. Sustainable flood memories, lay knowledges and the development of community resilience to future flood risk

    Directory of Open Access Journals (Sweden)

    McEwen Lindsey

    2016-01-01

    Full Text Available Shifts to devolved flood risk management in the UK pose questions about how the changing role of floodplain residents in community-led adaptation planning can be supported and strengthened. This paper shares insights from an interdisciplinary research project that has proposed the concept of ‘sustainable flood memory’ in the context of effective flood risk management. The research aimed to increase understanding of whether and how flood memories from the UK Summer 2007 extreme floods provide a platform for developing lay knowledges and flood resilience. The project investigated what factors link flood memory and lay knowledges of flooding, and how these connect and disconnect during and after flood events. In particular, and relation to flood governance directions, we sought to explore how such memories might play a part in individual and community resilience. The research presented here explores some key themes drawn from semi-structured interviews with floodplain residents with recent flood experiences in contrasting demographic and physical settings in the lower River Severn catchment. These include changing practices in making flood memories and materialising flood knowledge and the roles of active remembering and active forgetting.

  14. Hydrological forecast of maximal water level in Lepenica river basin and flood control measures

    Directory of Open Access Journals (Sweden)

    Milanović Ana

    2006-01-01

    Full Text Available Lepenica river basin territory has became axis of economic and urban development of Šumadija district. However, considering Lepenica River with its tributaries, and their disordered river regime, there is insufficient of water for water supply and irrigation, while on the other hand, this area is suffering big flood and torrent damages (especially Kragujevac basin. The paper presents flood problems in the river basin, maximum water level forecasts, and flood control measures carried out until now. Some of the potential solutions, aiming to achieve the effective flood control, are suggested as well.

  15. "Flooding Risk Analysis and the Understanding of Hydrological Disturbance due to the Rapid Urbanization in a Low-Scale Subwatershed in Houston Area". ( The project develops a relavant Model of flooding risk assessment to define the connection between increased streamflow/flooding and the rapid urban land development).

    Science.gov (United States)

    Geldiyev, P.

    2017-12-01

    Rapid urban development and changing climate influences the frequency and magnitude of flooding in Houston area. This proposed project aims to evaluate the flooding risks with the current and future land use changes by 2040 for one subbasin of the San Jacinto Brazos/Neches-Trinity Coastal basin. Surface environments and streamflow data of the Clear Creek are analyzed and stimulated to discuss the possible impact of urbanization on the occurrence of floods. The streamflow data is analyzed and simulated with the application of the Geographic Information Systems and its extensions. Both hydrologic and hydraulic models of the Clear Creek are created with the use of HEC-HMS and HEC-RAS software. Both models are duplicated for the year 2040, based on projected 2040 Landcover Maps developed by Houston and Galveston Area Council. This project examines a type of contemporary hydrologic disturbance and the interaction between land cover and changes in hydrological processes. Expected results will be very significant for urban development and flooding management.

  16. 78 FR 75370 - Draft Supplemental Environmental Assessment and Finding of No Significant Impact for Flood...

    Science.gov (United States)

    2013-12-11

    ... Environmental Assessment and Finding of No Significant Impact for Flood Control Improvements to the Rio Grande... Supplemental Environmental Assessment (SEA) and Finding of No Significant Impact (FONSI). SUMMARY: Pursuant to... Significant Impact for Flood Control Improvements to the Rio Grande Canalization Project in Vado, New Mexico...

  17. Capturing the multiple benefits associated with nature-based solutions: lessons from natural flood management project in the Cotswolds, UK

    Science.gov (United States)

    Short, Chrisopher; Clarke, Lucy; Uttley, Chris; Smith, Brian

    2017-04-01

    Following severe flooding in 2007, and subsequent smaller flood events, a decision was taken in 2012 to explore nature-based solutions in 250km2 river catchment in the southern Cotswolds in the UK. A major tributary within the catchment has been designated as rapid response; with a primarily limestone geology limestone and a mixture of spring and surface drained sources along a number of tributaries feeding in the river, with one main population centre where the water bodies converge. The project involves landscape and land management interventions aimed at attenuating high flows to reduce flood risk through changes in land management practices in both agriculture and forestry and slowing peak flows in surface flows through increased infiltration and attenuation areas. After three years of the project it is clear that the threshold for effectiveness requires the majority of the upstream catchment area to be implementing these measures. However, the cost effectiveness of the approach seems to be substantial compared to traditional hard-engineering approaches. The level of community involvement, including local flood forums, is high and the social, and natural, capital has been enhanced through the project. Early results suggest that there have been localized improvements in water quality and biodiversity as well as a reduction in peak flow but such changes are difficult to directly associate to the project. What is clear is the role of communities, landowners and partners to implement natural flood management on a catchment wide scale. In this sense the project has adopted a co-management or adaptive management approach which brings together the knowledges of hydrologists, ecologists, farmers, woodland owners and the local community to implement locally be-spoke solutions within a broader project framework. This paper will outline the initial findings and the governance structure that has assisted in the early success of the project within a theoretical framework of

  18. 2013 FEMA Flood Control Structures

    Data.gov (United States)

    Earth Data Analysis Center, University of New Mexico — The National Flood Hazard Layer (NFHL) data incorporates all Digital Flood Insurance Rate Map(DFIRM) databases published by FEMA, and any Letters Of Map Revision...

  19. Assessment Approach for Identifying Compatibility of Restoration Projects with Geomorphic and Flooding Processes in Gravel Bed Rivers.

    Science.gov (United States)

    DeVries, Paul; Aldrich, Robert

    2015-08-01

    A critical requirement for a successful river restoration project in a dynamic gravel bed river is that it be compatible with natural hydraulic and sediment transport processes operating at the reach scale. The potential for failure is greater at locations where the influence of natural processes is inconsistent with intended project function and performance. We present an approach using practical GIS, hydrologic, hydraulic, and sediment transport analyses to identify locations where specific restoration project types have the greatest likelihood of working as intended because their function and design are matched with flooding and morphologic processes. The key premise is to identify whether a specific river analysis segment (length ~1-10 bankfull widths) within a longer reach is geomorphically active or inactive in the context of vertical and lateral stabilities, and hydrologically active for floodplain connectivity. Analyses involve empirical channel geometry relations, aerial photographic time series, LiDAR data, HEC-RAS hydraulic modeling, and a time-integrated sediment transport budget to evaluate trapping efficiency within each segment. The analysis segments are defined by HEC-RAS model cross sections. The results have been used effectively to identify feasible projects in a variety of alluvial gravel bed river reaches with lengths between 11 and 80 km and 2-year flood magnitudes between ~350 and 1330 m(3)/s. Projects constructed based on the results have all performed as planned. In addition, the results provide key criteria for formulating erosion and flood management plans.

  20. Assessment Approach for Identifying Compatibility of Restoration Projects with Geomorphic and Flooding Processes in Gravel Bed Rivers

    Science.gov (United States)

    DeVries, Paul; Aldrich, Robert

    2015-08-01

    A critical requirement for a successful river restoration project in a dynamic gravel bed river is that it be compatible with natural hydraulic and sediment transport processes operating at the reach scale. The potential for failure is greater at locations where the influence of natural processes is inconsistent with intended project function and performance. We present an approach using practical GIS, hydrologic, hydraulic, and sediment transport analyses to identify locations where specific restoration project types have the greatest likelihood of working as intended because their function and design are matched with flooding and morphologic processes. The key premise is to identify whether a specific river analysis segment (length ~1-10 bankfull widths) within a longer reach is geomorphically active or inactive in the context of vertical and lateral stabilities, and hydrologically active for floodplain connectivity. Analyses involve empirical channel geometry relations, aerial photographic time series, LiDAR data, HEC-RAS hydraulic modeling, and a time-integrated sediment transport budget to evaluate trapping efficiency within each segment. The analysis segments are defined by HEC-RAS model cross sections. The results have been used effectively to identify feasible projects in a variety of alluvial gravel bed river reaches with lengths between 11 and 80 km and 2-year flood magnitudes between ~350 and 1330 m3/s. Projects constructed based on the results have all performed as planned. In addition, the results provide key criteria for formulating erosion and flood management plans.

  1. Flood hazard assessment in areas prone to flash flooding

    Science.gov (United States)

    Kvočka, Davor; Falconer, Roger A.; Bray, Michaela

    2016-04-01

    Contemporary climate projections suggest that there will be an increase in the occurrence of high-intensity rainfall events in the future. These precipitation extremes are usually the main cause for the emergence of extreme flooding, such as flash flooding. Flash floods are among the most unpredictable, violent and fatal natural hazards in the world. Furthermore, it is expected that flash flooding will occur even more frequently in the future due to more frequent development of extreme weather events, which will greatly increase the danger to people caused by flash flooding. This being the case, there will be a need for high resolution flood hazard maps in areas susceptible to flash flooding. This study investigates what type of flood hazard assessment methods should be used for assessing the flood hazard to people caused by flash flooding. Two different types of flood hazard assessment methods were tested: (i) a widely used method based on an empirical analysis, and (ii) a new, physically based and experimentally calibrated method. Two flash flood events were considered herein, namely: the 2004 Boscastle flash flood and the 2007 Železniki flash flood. The results obtained in this study suggest that in the areas susceptible to extreme flooding, the flood hazard assessment should be conducted using methods based on a mechanics-based analysis. In comparison to standard flood hazard assessment methods, these physically based methods: (i) take into account all of the physical forces, which act on a human body in floodwater, (ii) successfully adapt to abrupt changes in the flow regime, which often occur for flash flood events, and (iii) rapidly assess a flood hazard index in a relatively short period of time.

  2. Flash flood disasters analysis and evaluation: a case study of Yiyang County in China

    Science.gov (United States)

    Li, Haichen; Zhang, Xiaolei; Li, Qing; Qin, Tao; Lei, Xiaohui

    2018-03-01

    Global climate change leads to the more extreme precipitation and more flash flood disasters, which is a serious threat to the mountain inhabitants. To prevent flash flood disasters, China started flash flood disaster control planning and other projects from 2006. Among those measures, non-engineering measures are effective and economical. This paper introduced the framework of flash flood disaster analysis and evaluation in China, followed by a case study of Yiyang County.

  3. Optimal Control of Polymer Flooding Based on Maximum Principle

    Directory of Open Access Journals (Sweden)

    Yang Lei

    2012-01-01

    Full Text Available Polymer flooding is one of the most important technologies for enhanced oil recovery (EOR. In this paper, an optimal control model of distributed parameter systems (DPSs for polymer injection strategies is established, which involves the performance index as maximum of the profit, the governing equations as the fluid flow equations of polymer flooding, and the inequality constraint as the polymer concentration limitation. To cope with the optimal control problem (OCP of this DPS, the necessary conditions for optimality are obtained through application of the calculus of variations and Pontryagin’s weak maximum principle. A gradient method is proposed for the computation of optimal injection strategies. The numerical results of an example illustrate the effectiveness of the proposed method.

  4. MINERVE flood warning and management project. What is computed, what is required and what is visualized?

    Science.gov (United States)

    Garcia Hernandez, J.; Boillat, J.-L.; Schleiss, A.

    2010-09-01

    During last decades several flood events caused important inundations in the Upper Rhone River basin in Switzerland. As a response to such disasters, the MINERVE project aims to improve the security by reducing damages in this basin. The main goal of this project is to predict floods in advance in order to obtain a better flow control during flood peaks taking advantage from the multireservoir system of the existing hydropower schemes. The MINERVE system evaluates the hydro-meteorological situation on the watershed and provides hydrological forecasts with a horizon from three to five days. It exploits flow measurements, data from reservoirs and hydropower plants as well as deterministic (COSMO-7 and COSMO-2) and ensemble (COSMO-LEPS) meteorological forecast from MeteoSwiss. The hydrological model is based on a semi-distributed concept, dividing the watershed in 239 sub-catchments, themselves decomposed in elevation bands in order to describe the temperature-driven processes related to snow and glacier melt. The model is completed by rivers and hydraulic works such as water intakes, reservoirs, turbines and pumps. Once the hydrological forecasts are calculated, a report provides the warning level at selected control points according to time, being a support to decision-making for preventive actions. A Notice, Alert or Alarm is then activated depending on the discharge thresholds defined by the Valais Canton. Preventive operation scenarios are then generated based on observed discharge at control points, meteorological forecasts from MeteoSwiss, hydrological forecasts from MINERVE and retention possibilities in the reservoirs. An update of the situation is done every time new data or new forecasts are provided, keeping last observations and last forecasts in the warning report. The forecasts can also be used for the evaluation of priority decisions concerning the management of hydropower plants for security purposes. Considering future inflows and reservoir levels

  5. Geological setting control of flood dynamics in lowland rivers (Poland).

    Science.gov (United States)

    Wierzbicki, Grzegorz; Ostrowski, Piotr; Falkowski, Tomasz; Mazgajski, Michał

    2018-04-27

    We aim to answer a question: how does the geological setting affect flood dynamics in lowland alluvial rivers? The study area covers three river reaches: not trained, relatively large on the European scale, flowing in broad valleys cut in the landscape of old glacial plains. We focus on the locations where levees [both: a) natural or b) artificial] were breached during flood. In these locations we identify (1) the erosional traces of flood (crevasse channels) on the floodplain displayed on DEM derived from ALS LIDAR. In the main river channel, we perform drillings in order to measure the depth of the suballuvial surface and to locate (2) the protrusions of bedrock resistant to erosion. We juxtapose on one map: (1) the floodplain geomorphology with (2) the geological data from the river channel. The results from each of the three study reaches are presented on maps prepared in the same manner in order to enable a comparison of the regularities of fluvial processes written in (1) the landscape and driven by (2) the geological setting. These processes act in different river reaches: (a) not embanked and dominated by ice jam floods, (b) embanked and dominated by rainfall and ice jam floods. We also analyse hydrological data to present hydrodynamic descriptions of the flood. Our principal results indicate similarity of (1) distinctive erosional patterns and (2) specific geological features in all three study reaches. We draw the conclusion: protrusions of suballuvial bedrock control the flood dynamics in alluvial rivers. It happens in both types of rivers. In areas where the floodplain remains natural, the river inundates freely during every flood. In other areas the floodplain has been reclaimed by humans who constructed an artificial levee system, which protects the flood-prone area from inundation, until levee breach occurs. Copyright © 2018 Elsevier B.V. All rights reserved.

  6. Risk factors of diarrhoea among flood victims: a controlled epidemiological study.

    Science.gov (United States)

    Mondal, N C; Biswas, R; Manna, A

    2001-01-01

    The concept and practice of 'disaster preparedness and response', instead of traditional casualty relief, is relatively new. Vulnerability analysis and health risks assessment of disaster prone communities are important prerequisites of meaningful preparedness and effective response against any calamity. In this community based study, the risk of diarrhoeal disease and its related epidemiological factors were analysed by collecting data from two selected flood prone block of Midnapur district of West Bengal. The information was compared with that of another population living in two non-flood prone blocks of the same district. The study showed that diarrhoeal disease was the commonest morbidity in flood prone population. Some behaviours, like use of pond water for utensil wash and kitchen purpose, hand washing after defecation without soap, improper hand washing before eating, open field defecation, storage of drinking water in wide mouth vessels etc. were found to be associated with high attack rate of diarrhoea, in both study and control population during flood season compared to pre-flood season. Attack rates were also significantly higher in flood prone population than that of population in non-flood prone area during the same season. Necessity of both community education for proper water use behaviour and personal hygiene along with ensuring safe water and sanitation facilities of flood affected communities were emphasized.

  7. Flood risk governance arrangements in Europe

    Science.gov (United States)

    Matczak, P.; Lewandowski, J.; Choryński, A.; Szwed, M.; Kundzewicz, Z. W.

    2015-06-01

    The STAR-FLOOD (Strengthening and Redesigning European Flood Risk Practices Towards Appropriate and Resilient Flood Risk Governance Arrangements) project, funded by the European Commission, investigates strategies for dealing with flood risk in six European countries: Belgium, the UK, France, the Netherlands, Poland and Sweden and in 18 vulnerable urban regions in these countries. The project aims to describe, analyse, explain, and evaluate the main similarities and differences between the selected EU Member States in terms of development and performance of flood risk governance arrangements. It also discusses the scientific and societal importance of these similarities and differences. Attention is paid to identification and characterization of shifts in flood risk governance arrangements and in flood risk management strategies and to determination of triggering factors and restraining factors. An assessment of a change of resilience and appropriateness (legitimacy, effectiveness, efficiency) of flood risk governance arrangements in Poland is presented and comparison with other European countries is offered.

  8. Flood risk governance arrangements in Europe

    Directory of Open Access Journals (Sweden)

    P. Matczak

    2015-06-01

    Full Text Available The STAR-FLOOD (Strengthening and Redesigning European Flood Risk Practices Towards Appropriate and Resilient Flood Risk Governance Arrangements project, funded by the European Commission, investigates strategies for dealing with flood risk in six European countries: Belgium, the UK, France, the Netherlands, Poland and Sweden and in 18 vulnerable urban regions in these countries. The project aims to describe, analyse, explain, and evaluate the main similarities and differences between the selected EU Member States in terms of development and performance of flood risk governance arrangements. It also discusses the scientific and societal importance of these similarities and differences. Attention is paid to identification and characterization of shifts in flood risk governance arrangements and in flood risk management strategies and to determination of triggering factors and restraining factors. An assessment of a change of resilience and appropriateness (legitimacy, effectiveness, efficiency of flood risk governance arrangements in Poland is presented and comparison with other European countries is offered.

  9. Influence of Flood Detention Capability in Flood Prevention for Flood Disaster of Depression Area

    OpenAIRE

    Chia Lin Chan; Yi Ju Yang; Chih Chin Yang

    2011-01-01

    Rainfall records of rainfall station including the rainfall potential per hour and rainfall mass of five heavy storms are explored, respectively from 2001 to 2010. The rationalization formula is to investigate the capability of flood peak duration of flood detention pond in different rainfall conditions. The stable flood detention model is also proposed by using system dynamic control theory to get the message of flood detention pond in this research. When rainfall freque...

  10. Sea level rise drives increased tidal flooding frequency at tide gauges along the U.S. East and Gulf Coasts: Projections for 2030 and 2045.

    Science.gov (United States)

    Dahl, Kristina A; Fitzpatrick, Melanie F; Spanger-Siegfried, Erika

    2017-01-01

    Tidal flooding is among the most tangible present-day effects of global sea level rise. Here, we utilize a set of NOAA tide gauges along the U.S. East and Gulf Coasts to evaluate the potential impact of future sea level rise on the frequency and severity of tidal flooding. Using the 2001-2015 time period as a baseline, we first determine how often tidal flooding currently occurs. Using localized sea level rise projections based on the Intermediate-Low, Intermediate-High, and Highest projections from the U.S. National Climate Assessment, we then determine the frequency and extent of such flooding at these locations for two near-term time horizons: 2030 and 2045. We show that increases in tidal flooding will be substantial and nearly universal at the 52 locations included in our analysis. Long before areas are permanently inundated, the steady creep of sea level rise will force many communities to grapple with chronic high tide flooding in the next 15 to 30 years.

  11. Citizen involvement in flood risk governance: flood groups and networks

    Directory of Open Access Journals (Sweden)

    Twigger-Ross Clare

    2016-01-01

    Full Text Available Over the past decade has been a policy shift withinUK flood risk management towards localism with an emphasis on communities taking ownership of flood risk. There is also an increased focus on resilience and, more specifically, on community resilience to flooding. This paper draws on research carried out for UK Department for Environment Food and Rural Affairs to evaluate the Flood Resilience Community Pathfinder (FRCP scheme in England. Resilience is conceptualised as multidimensional and linked to exisiting capacities within a community. Creating resilience to flooding is an ongoing process of adaptation, learning from past events and preparing for future risks. This paper focusses on the development of formal and informal institutions to support improved flood risk management: institutional resilience capacity. It includes new institutions: e.g. flood groups, as well as activities that help to build inter- and intra- institutional resilience capacity e.g. community flood planning. The pathfinder scheme consisted of 13 projects across England led by local authorities aimed at developing community resilience to flood risk between 2013 – 2015. This paper discusses the nature and structure of flood groups, the process of their development, and the extent of their linkages with formal institutions, drawing out the barriers and facilitators to developing institutional resilience at the local level.

  12. Amplification of flood frequencies with local sea level rise and emerging flood regimes

    Science.gov (United States)

    Buchanan, Maya K.; Oppenheimer, Michael; Kopp, Robert E.

    2017-06-01

    The amplification of flood frequencies by sea level rise (SLR) is expected to become one of the most economically damaging impacts of climate change for many coastal locations. Understanding the magnitude and pattern by which the frequency of current flood levels increase is important for developing more resilient coastal settlements, particularly since flood risk management (e.g. infrastructure, insurance, communications) is often tied to estimates of flood return periods. The Intergovernmental Panel on Climate Change’s Fifth Assessment Report characterized the multiplication factor by which the frequency of flooding of a given height increases (referred to here as an amplification factor; AF). However, this characterization neither rigorously considered uncertainty in SLR nor distinguished between the amplification of different flooding levels (such as the 10% versus 0.2% annual chance floods); therefore, it may be seriously misleading. Because both historical flood frequency and projected SLR are uncertain, we combine joint probability distributions of the two to calculate AFs and their uncertainties over time. Under probabilistic relative sea level projections, while maintaining storm frequency fixed, we estimate a median 40-fold increase (ranging from 1- to 1314-fold) in the expected annual number of local 100-year floods for tide-gauge locations along the contiguous US coastline by 2050. While some places can expect disproportionate amplification of higher frequency events and thus primarily a greater number of historically precedented floods, others face amplification of lower frequency events and thus a particularly fast growing risk of historically unprecedented flooding. For example, with 50 cm of SLR, the 10%, 1%, and 0.2% annual chance floods are expected respectively to recur 108, 335, and 814 times as often in Seattle, but 148, 16, and 4 times as often in Charleston, SC.

  13. Catchment scale multi-objective flood management

    Science.gov (United States)

    Rose, Steve; Worrall, Peter; Rosolova, Zdenka; Hammond, Gene

    2010-05-01

    techniques will include: controlling headwater drainage, increasing evapotranspiration and interception by creating new woodlands in the upper catchment areas, enabling coarse woody debris dams to slow down water flows through steep valleys, improving soil water storage potential by appropriate soil and crop management, retaining water on lowland flood meadows and wet woodland creation within the floodplain. The project, due to run from 2009 until 2013, incorporates hydrometric and water quality monitoring, together with hydrologic and hydraulic modelling in order to attempt to demonstrate the effect of land management changes on flood dynamics and flood risk management. To date, the project team have undertaken the fundamental catchment characterisation work to understand its physical setting and the interaction of the physical processes that influence the hydrological response of the catchment to incident precipitation. The results of this initial work has led to the identification of a suitably robust hydrometric monitoring network within the catchments to meet the needs of providing both quantitative evidence of the impacts of land management change on flood risk, together with generating good quality datasets for the validation and testing of the new hydrologic models. As the project aims to demonstrate ‘best practice' in all areas, the opportunity has been taken to install a network of automatic hydrometric monitoring equipment, together with an associated telemetry system, in order to maximise data coverage, accuracy and reliability. Good quality datasets are a critical requirement for reliable modelling. The modelling will also be expanded to incorporate climate change scenarios. This paper will describe the catchment characterisation work undertaken to date, the proposed land management changes in relation to flood risk management, the initial catchment hydraulic modelling work and the implementation of the new hydrometric monitoring network within the study area.

  14. Distillation Column Flooding Predictor

    Energy Technology Data Exchange (ETDEWEB)

    George E. Dzyacky

    2010-11-23

    The Flooding Predictor™ is a patented advanced control technology proven in research at the Separations Research Program, University of Texas at Austin, to increase distillation column throughput by over 6%, while also increasing energy efficiency by 10%. The research was conducted under a U. S. Department of Energy Cooperative Agreement awarded to George Dzyacky of 2ndpoint, LLC. The Flooding Predictor™ works by detecting the incipient flood point and controlling the column closer to its actual hydraulic limit than historical practices have allowed. Further, the technology uses existing column instrumentation, meaning no additional refining infrastructure is required. Refiners often push distillation columns to maximize throughput, improve separation, or simply to achieve day-to-day optimization. Attempting to achieve such operating objectives is a tricky undertaking that can result in flooding. Operators and advanced control strategies alike rely on the conventional use of delta-pressure instrumentation to approximate the column’s approach to flood. But column delta-pressure is more an inference of the column’s approach to flood than it is an actual measurement of it. As a consequence, delta pressure limits are established conservatively in order to operate in a regime where the column is never expected to flood. As a result, there is much “left on the table” when operating in such a regime, i.e. the capacity difference between controlling the column to an upper delta-pressure limit and controlling it to the actual hydraulic limit. The Flooding Predictor™, an innovative pattern recognition technology, controls columns at their actual hydraulic limit, which research shows leads to a throughput increase of over 6%. Controlling closer to the hydraulic limit also permits operation in a sweet spot of increased energy-efficiency. In this region of increased column loading, the Flooding Predictor is able to exploit the benefits of higher liquid

  15. Estimating flood discharge using witness movies in post-flood hydrological surveys

    Science.gov (United States)

    Le Coz, Jérôme; Hauet, Alexandre; Le Boursicaud, Raphaël; Pénard, Lionel; Bonnifait, Laurent; Dramais, Guillaume; Thollet, Fabien; Braud, Isabelle

    2015-04-01

    The estimation of streamflow rates based on post-flood surveys is of paramount importance for the investigation of extreme hydrological events. Major uncertainties usually arise from the absence of information on the flow velocities and from the limited spatio-temporal resolution of such surveys. Nowadays, after each flood occuring in populated areas home movies taken from bridges, river banks or even drones are shared by witnesses through Internet platforms like YouTube. Provided that some topography data and additional information are collected, image-based velocimetry techniques can be applied to some of these movie materials, in order to estimate flood discharges. As a contribution to recent post-flood surveys conducted in France, we developed and applied a method for estimating velocities and discharges based on the Large Scale Particle Image Velocimetry (LSPIV) technique. Since the seminal work of Fujita et al. (1998), LSPIV applications to river flows were reported by a number of authors and LSPIV can now be considered a mature technique. However, its application to non-professional movies taken by flood witnesses remains challenging and required some practical developments. The different steps to apply LSPIV analysis to a flood home movie are as follows: (i) select a video of interest; (ii) contact the author for agreement and extra information; (iii) conduct a field topography campaign to georeference Ground Control Points (GCPs), water level and cross-sectional profiles; (iv) preprocess the video before LSPIV analysis: correct lens distortion, align the images, etc.; (v) orthorectify the images to correct perspective effects and know the physical size of pixels; (vi) proceed with the LSPIV analysis to compute the surface velocity field; and (vii) compute discharge according to a user-defined velocity coefficient. Two case studies in French mountainous rivers during extreme floods are presented. The movies were collected on YouTube and field topography

  16. Analysis of Hydraulic Flood Control Structure at Putat Boro River

    OpenAIRE

    Ruzziyatno, Ruhban

    2015-01-01

    Putat Boro River is one of the main drainage systems of Surakarta city which drains into Bengawan Solo river. The primary problem when flood occur is the higher water level of Bengawan Solo than Boro River and then backwater occur and inundates Putat Boro River. The objective of the study is to obtain operational method of Putat Boro River floodgate to control both inflows and outflows not only during flood but also normal condition. It also aims to know the Putat Boro rivers floodgate op...

  17. Mapping flood hazards under uncertainty through probabilistic flood inundation maps

    Science.gov (United States)

    Stephens, T.; Bledsoe, B. P.; Miller, A. J.; Lee, G.

    2017-12-01

    Changing precipitation, rapid urbanization, and population growth interact to create unprecedented challenges for flood mitigation and management. Standard methods for estimating risk from flood inundation maps generally involve simulations of floodplain hydraulics for an established regulatory discharge of specified frequency. Hydraulic model results are then geospatially mapped and depicted as a discrete boundary of flood extents and a binary representation of the probability of inundation (in or out) that is assumed constant over a project's lifetime. Consequently, existing methods utilized to define flood hazards and assess risk management are hindered by deterministic approaches that assume stationarity in a nonstationary world, failing to account for spatio-temporal variability of climate and land use as they translate to hydraulic models. This presentation outlines novel techniques for portraying flood hazards and the results of multiple flood inundation maps spanning hydroclimatic regions. Flood inundation maps generated through modeling of floodplain hydraulics are probabilistic reflecting uncertainty quantified through Monte-Carlo analyses of model inputs and parameters under current and future scenarios. The likelihood of inundation and range of variability in flood extents resulting from Monte-Carlo simulations are then compared with deterministic evaluations of flood hazards from current regulatory flood hazard maps. By facilitating alternative approaches of portraying flood hazards, the novel techniques described in this presentation can contribute to a shifting paradigm in flood management that acknowledges the inherent uncertainty in model estimates and the nonstationary behavior of land use and climate.

  18. Climate change track in river floods in Europe

    Directory of Open Access Journals (Sweden)

    Z. W. Kundzewicz

    2015-06-01

    Full Text Available A holistic perspective on changing river flood risk in Europe is provided. Economic losses from floods have increased, principally driven by the expanding exposure of assets at risk. Climate change (i.e. observed increase in precipitation intensity, decrease of snowpack and other observed climate changes might already have had an impact on floods. However, no gauge-based evidence had been found for a climate-driven, widespread change in the magnitude/frequency of floods during the last decades. There are strong regional and sub-regional variations in the trends. Moreover, it has not been generally possible to attribute rain-generated peak streamflow trends to anthropogenic climate change. Physical reasoning suggests that projected increases in the frequency and intensity of heavy rainfall would contribute to increases in rain-generated local floods, while less snowmelt flooding and earlier spring peak flows in snowmelt-fed rivers are expected. However, there is low confidence in future changes in flood magnitude and frequency resulting from climate change. The impacts of climate change on flood characteristics are highly sensitive to the detailed nature of those changes. Discussion of projections of flood hazard in Europe is offered. Attention is drawn to a considerable uncertainty - over the last decade or so, projections of flood hazard in Europe have largely changed.

  19. Impact of Austrian hydropower plants on the flood control safety of the Hungarian Danube reach

    International Nuclear Information System (INIS)

    Zsuffa, I.

    1999-01-01

    Statistical analysis of daily water level data from four gauging stations along the Hungarian Danube reach has been carried out with the purpose of analysing the impact of the Austrian hydropower plants on the floods of the river. Conditional probability distribution functions of annual flood load maxima and annual number of floods were generated for the periods 1957-1976 and 1977-1996. By comparing these distribution functions, it could be shown that the flood load maxima have decreased, while the number of small and medium floods have increased during the past forty years. These changes indicate a decreased rate of flood superposition resulting from the barrages constructed in this period. The significantly decreased flood load maxima indicate that the Austrian barrage system has positive impact on the flood control safety of the Hungarian Danube reach

  20. Comparing CMIP-3 and CMIP-5 climate projections on flooding estimation of Devils Lake of North Dakota, USA

    Directory of Open Access Journals (Sweden)

    Gehendra Kharel

    2018-04-01

    Full Text Available Background Water level fluctuations in endorheic lakes are highly susceptible to even slight changes in climate and land use. Devils Lake (DL in North Dakota, USA is an endorheic system that has undergone multi-decade flooding driven by changes in regional climate. Flooding mitigation strategies have centered on the release of lake water to a nearby river system through artificial outlets, resulting in legal challenges and environmental concerns related to water quality, downstream flooding, species migration, stakeholder opposition, and transboundary water conflicts between the US and Canada. Despite these drawbacks, running outlets would result in low overspill risks in the next 30 years. Methods In this study we evaluated the efficacy of this outlet-based mitigation strategy under scenarios based on the latest IPCC future climate projections. We used the Coupled Model Intercomparison Project CMIP-5 weather patterns from 17 general circulation models (GCMs obtained under four representative concentration pathways (RCP scenarios and downscaled to the DL region. Then, we simulated the changes in lake water levels using the soil and water assessment tool based hydrological model of the watershed. We estimated the probability of future flood risks under those scenarios and compared those with previously estimated overspill risks under the CMIP-3 climate. Results The CMIP-5 ensemble projected a mean annual temperature of 5.78 °C and mean daily precipitation of 1.42 mm/day; both are higher than the existing CMIP-3 future estimates of 4.98 °C and 1.40 mm/day, respectively. The increased precipitation and higher temperature resulted in a significant increase of DL’s overspill risks: 24.4–47.1% without release from outlets and 3.5–14.4% even if the outlets are operated at their combined full 17 m3/s capacity. Discussion The modeled increases in overspill risks indicate a greater frequency of water releases through the artificial outlets. Future

  1. Evidence of a non-dimensional parameter controlling the flooding of PEMFC stack

    Energy Technology Data Exchange (ETDEWEB)

    Buaud, Fabrice; Lelandais, Damien [Heat and Energy Department, Polytech' Nantes, Nantes University, Rue Christian Pauc, BP50609, 44 306 Nantes Cedex 3 (France); Auvity, Bruno [Heat and Energy Department, Polytech' Nantes, Nantes University, Rue Christian Pauc, BP50609, 44 306 Nantes Cedex 3 (France); Laboratoire de Thermocinetique de Nantes (CNRS-UMR 6607) (France)

    2008-06-15

    Water management is a key issue to get satisfactory and stable Polymer exchange membrane fuel cell (PEMFC) performances. The work reported in the present paper focuses on the determination of the operational conditions when using PEMFC stack working with ambient air without extra humidification. The objectives are to reduce as much as possible the auxiliaries consumptions. As far as the reaction air blower is concerned, the specific goal of the present tests is to find the minimum air flow rate to feed the PEMFC stack in order to prevent flooding. Our particular interest concerns the control of a PEMFC stack to power a prototype vehicle for the Shell Eco Marathon race. Tests are then conducted on a wide range of stoichiometry, for different values of current and stack temperature using ambient air. Flooding is shown to depend on all these parameters. A water balance calculation is developed comparing the amount of water produced by the electrochemical reaction to the amount of water transported as vapour in the exit air flow minus the amount of water incoming the stack in the ambient air. A non-dimensional number called the Flooding Number is constructed. This balance is first considered in the ideal case with the theoretical flow rate of reactants and products. It is shown that the stack temperature and the stoichiometry are the main order parameters and that conditions of ambient air have only secondary effects on the water balance. In a second step, the Flooding Number is evaluated for all the experimental tests. A critical Flooding Number appears clearly delimiting the range of operational conditions for which stack flooding appears. This result allows us to control the air blower and the cooling fan during the runs at the Shell Eco Marathon 2007 race in order to reduce hydrogen consumption due to auxiliaries. The non-dimensional number exhibited in the present paper is believed to be relevant to stack flooding. It can be used for any PEMFC stack to make clear

  2. Recent advances in flood forecasting and flood risk assessment

    Directory of Open Access Journals (Sweden)

    G. Arduino

    2005-01-01

    Full Text Available Recent large floods in Europe have led to increased interest in research and development of flood forecasting systems. Some of these events have been provoked by some of the wettest rainfall periods on record which has led to speculation that such extremes are attributable in some measure to anthropogenic global warming and represent the beginning of a period of higher flood frequency. Whilst current trends in extreme event statistics will be difficult to discern, conclusively, there has been a substantial increase in the frequency of high floods in the 20th century for basins greater than 2x105 km2. There is also increasing that anthropogenic forcing of climate change may lead to an increased probability of extreme precipitation and, hence, of flooding. There is, therefore, major emphasis on the improvement of operational flood forecasting systems in Europe, with significant European Community spending on research and development on prototype forecasting systems and flood risk management projects. This Special Issue synthesises the most relevant scientific and technological results presented at the International Conference on Flood Forecasting in Europe held in Rotterdam from 3-5 March 2003. During that meeting 150 scientists, forecasters and stakeholders from four continents assembled to present their work and current operational best practice and to discuss future directions of scientific and technological efforts in flood prediction and prevention. The papers presented at the conference fall into seven themes, as follows.

  3. Introduction to flood control science

    International Nuclear Information System (INIS)

    Lee, Dong U; Ha, Jin Uk; Kim, Dong Ha; Shin, Hong Ryeol; Song, Seok Hwan; Kim, Jin Gyu; Moon, Heon Cheol

    2003-01-01

    This book covers introduction, industrialization disaster such as Bhopal and Chernobyl disaster, earthquake disaster, volcano disaster, avalanche disaster including loss allocation and prevention measures, and natural fire by showing California, Yellowstone park and similarity between fire and flood. It also introduces climate change and disaster, Earth's greenhouse effect and disaster due to current sea level rise, flood damage, drought disaster, famine and drought, prediction of drought, population problems, outlook of world population, and disaster prevention administration system of Korea.

  4. Improving Flood Risk Maps as a Capacity Building Activity: Fostering Public Participation and Raising Flood Risk Awareness in the German Mulde Region (project RISK MAP)

    Science.gov (United States)

    Luther, J.; Meyer, V.; Kuhlicke, C.; Scheuer, S.; Unnerstall, H.

    2012-04-01

    The EU Floods Directive requires the establishment of flood risk maps for high risk areas in all EU Member States by 2013. However, if existing at all, the current practice of risk mapping still shows some deficits: Risk maps are often seen as an information tool rather than a communication tool. This means that e.g. important local knowledge is not incorporated and forms a contrast to the understanding of capacity building which calls for engaging individuals in the process of learning and adapting to change and for the establishment of a more interactive public administration that learns equally from its actions and from the feedback it receives. Furthermore, the contents of risk maps often do not match the requirements of the end users, so that risk maps are often designed and visualised in a way which cannot be easily understood by laypersons and/or which is not suitable for the respective needs of public authorities in risk and flood event management. The project RISK MAP aimed at improving flood risk maps as a means to foster public participation and raising flood risk awareness. For achieving this aim, RISK MAP (1) developed rules for appropriate stakeholder participation enabling the incorporation of local knowledge and preferences; (2) improved the content of risk maps by considering different risk criteria through the use of a deliberative multicriteria risk mapping tool; and (3) improved the visualisation of risk maps in order to produce user-friendly risk maps by applying the experimental graphic semiology (EGS) method that uses the eye tracking approach. The research was carried out in five European case studies where the status quo of risk mapping and the legal framework was analysed, several stakeholder interviews and workshops were conducted, the visual perception of risk maps was tested and - based on this empirical work - exemplary improved risk maps were produced. The presentation and paper will outline the main findings of the project which

  5. The influence of controlled floods on fine sediment storage in debris fan-affected canyons of the Colorado River basin

    Science.gov (United States)

    Mueller, Erich R.; Grams, Paul E.; Schmidt, John C.; Hazel, Joseph E.; Alexander, Jason S.; Kaplinski, Matt

    2014-01-01

    Prior to the construction of large dams on the Green and Colorado Rivers, annual floods aggraded sandbars in lateral flow-recirculation eddies with fine sediment scoured from the bed and delivered from upstream. Flows greater than normal dam operations may be used to mimic this process in an attempt to increase time-averaged sandbar size. These controlled floods may rebuild sandbars, but sediment deficit conditions downstream from the dams restrict the frequency that controlled floods produce beneficial results. Here, we integrate complimentary, long-term monitoring data sets from the Colorado River in Marble and Grand Canyons downstream from Glen Canyon dam and the Green River in the Canyon of Lodore downstream from Flaming Gorge dam. Since the mid-1990s, several controlled floods have occurred in these canyon rivers. These controlled floods scour fine sediment from the bed and build sandbars in eddies, thus increasing channel relief. These changes are short-lived, however, as interflood dam operations erode sandbars within several months to years. Controlled flood response and interflood changes in bed elevation are more variable in Marble Canyon and Grand Canyon, likely reflecting more variable fine sediment supply and stronger transience in channel bed sediment storage. Despite these differences, neither system shows a trend in fine-sediment storage during the period in which controlled floods were monitored. These results demonstrate that controlled floods build eddy sandbars and increase channel relief for short interflood periods, and this response may be typical in other dam-influenced canyon rivers. The degree to which these features persist depends on the frequency of controlled floods, but careful consideration of sediment supply is necessary to avoid increasing the long-term sediment deficit.

  6. Why the 2010 Indus floods hit Pakistan so hard | IDRC - International ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... to help reduce their vulnerability to future extreme weather events. ... phase of the project, researchers reviewed numerous situation reports, media articles, and ... Irrigation management and flood control is defined by power relationships: in ...

  7. IMPACTS OF WETLAND DEGRADATION IN NIGER DELTA NIGERIA AND ITS SIGNIFICANCE IN FLOOD CONTROL

    Directory of Open Access Journals (Sweden)

    Enwere Chidimma Loveline

    2015-08-01

    Full Text Available  Wetlands perform a wide variety of functions that include flood control, ground water recharge, shore line stabilization, storm protection and climate moderation. However, despite these huge wetland functions, it has witnessed poor appreciation and dreadful conditions. Niger Delta has witnessed constant coastal erosion and rising sea level, this has led to large portions of the landmass being eroded. This paper aims to review some environmental effects of flooding in the Niger Delta region of Nigeria to provide the desired knowledge of role that wetlands play in reducing flood impacts. However, having witnessed the flood, the experience opened my eyes to the environmental challenges facing Niger Delta with respect to Wetlands degradation, poor perception of wetland values and functions, poor environmental practices and non-implementation of environmental regulations. This memorable experience rekindled the desire and motivation to seek a solution to wetland degradation with the aim of recognizing significance of wetlands at the centre of achieving both livelihood and biodiversity improvements to address coastal flooding problem.The study therefore concludes that wetlands are very significant in flood control and thus the conservation and restoration of wetlands, should put in place measures to reduce wetland destruction.International Journal of EnvironmentVolume-4, Issue-3, June-August 2015Page: 177-184

  8. Interpreting the impact of flood forecasts by combining policy analysis studies and flood defence

    Directory of Open Access Journals (Sweden)

    Slomp Robert

    2016-01-01

    Rijkswaterstaat. Other organisations use these forecasts to define the consequences of the forecast, to take measures (as the evacuation of camping places on rivers banks or lake shores or to estimate the conditional probability of failure of a flood defence. Increasing the resilience of the population by disseminating information from both policy studies (flood scenarios and flood forecasts has been the project goal of the MEGO project “Module Evacuatie Grote Overstromingen”, an information tool for large scale evacuation due to floods. This information is available on a national website. The MEGO project has focussed on making the information from two major policy studies on flood risk available, the first sturdy determined new risk-based standards for flood defences (WV21. The second study determined the current flood risk (VNK-2. The MEGO database contains a selection of verified flood scenario’s. For each scenario the hydraulic loads which will cause a flood are known as are the probabilities of flooding and predicted casualties and damages. Overland flow maps are available. MEGO combines this data with the flood forecast, open data of the “Cadastre” (national Registry, the national digital terrain model (AHN and the main infrastructure (local, regional and national. The site offers prepared and real time maps for professionals during a crisis, and tools to increase risk awareness for citizens. The software was recently renamed national water and flood information system, “Landelijk Informatiesysteem Water en Overstromingen (LIWO ’ when it went live in 2016. In LIWO the second goal of MEGO was realized, by adding the information from flood forecasts. It is an open source model.

  9. Geochemistry and flooding as determining factors of plant species composition in Dutch winter-flooded riverine grasslands

    NARCIS (Netherlands)

    Beumer, V.; Wirdum, G. van; Beltman, B.; Griffioen, J.; Grootjans, A.P.; Verhoeven, J.T.A.

    2008-01-01

    Dutch water policy aims for more frequent, controlled flooding of river valley floodplains to avoid unwanted flooding elsewhere; in anticipation of increased flooding risks resulting from climate changes. Controlled flooding usually takes place in winter in parts of the valleys which had not been

  10. The Namibia Early Flood Warning System, A CEOS Pilot Project

    Science.gov (United States)

    Mandl, Daniel; Frye, Stuart; Cappelaere, Pat; Sohlberg, Robert; Handy, Matthew; Grossman, Robert

    2012-01-01

    Over the past year few years, an international collaboration has developed a pilot project under the auspices of Committee on Earth Observation Satellite (CEOS) Disasters team. The overall team consists of civilian satellite agencies. For this pilot effort, the development team consists of NASA, Canadian Space Agency, Univ. of Maryland, Univ. of Colorado, Univ. of Oklahoma, Ukraine Space Research Institute and Joint Research Center(JRC) for European Commission. This development team collaborates with regional , national and international agencies to deliver end-to-end disaster coverage. In particular, the team in collaborating on this effort with the Namibia Department of Hydrology to begin in Namibia . However, the ultimate goal is to expand the functionality to provide early warning over the South Africa region. The initial collaboration was initiated by United Nations Office of Outer Space Affairs and CEOS Working Group for Information Systems and Services (WGISS). The initial driver was to demonstrate international interoperability using various space agency sensors and models along with regional in-situ ground sensors. In 2010, the team created a preliminary semi-manual system to demonstrate moving and combining key data streams and delivering the data to the Namibia Department of Hydrology during their flood season which typically is January through April. In this pilot, a variety of moderate resolution and high resolution satellite flood imagery was rapidly delivered and used in conjunction with flood predictive models in Namibia. This was collected in conjunction with ground measurements and was used to examine how to create a customized flood early warning system. During the first year, the team made use of SensorWeb technology to gather various sensor data which was used to monitor flood waves traveling down basins originating in Angola, but eventually flooding villages in Namibia. The team made use of standardized interfaces such as those articulated

  11. The Aqueduct Global Flood Analyzer

    Science.gov (United States)

    Iceland, Charles

    2015-04-01

    As population growth and economic growth take place, and as climate change accelerates, many regions across the globe are finding themselves increasingly vulnerable to flooding. A recent OECD study of the exposure of the world's large port cities to coastal flooding found that 40 million people were exposed to a 1 in 100 year coastal flood event in 2005, and the total value of exposed assets was about US 3,000 billion, or 5% of global GDP. By the 2070s, those numbers were estimated to increase to 150 million people and US 35,000 billion, or roughly 9% of projected global GDP. Impoverished people in developing countries are particularly at risk because they often live in flood-prone areas and lack the resources to respond. WRI and its Dutch partners - Deltares, IVM-VU University Amsterdam, Utrecht University, and PBL Netherlands Environmental Assessment Agency - are in the initial stages of developing a robust set of river flood and coastal storm surge risk measures that show the extent of flooding under a variety of scenarios (both current and future), together with the projected human and economic impacts of these flood scenarios. These flood risk data and information will be accessible via an online, easy-to-use Aqueduct Global Flood Analyzer. We will also investigate the viability, benefits, and costs of a wide array of flood risk reduction measures that could be implemented in a variety of geographic and socio-economic settings. Together, the activities we propose have the potential for saving hundreds of thousands of lives and strengthening the resiliency and security of many millions more, especially those who are most vulnerable. Mr. Iceland will present Version 1.0 of the Aqueduct Global Flood Analyzer and provide a preview of additional elements of the Analyzer to be released in the coming years.

  12. Analyzing Future Flooding under Climate Change Scenario using CMIP5 Streamflow Data

    Science.gov (United States)

    Parajuli, Ranjan; Nyaupane, Narayan; Kalra, Ajay

    2017-12-01

    Flooding is a severe and costlier natural hazard. The effect of climate change has intensified the scenario in recent years. Flood prevention practice along with a proper understanding of flooding event can mitigate the risk of such hazard. The floodplain mapping is one of the technique to quantify the severity of the flooding. Carson City, which is one of the agricultural areas in the desert of Nevada has experienced peak flood in the recent year. The underlying probability distribution for the area, latest Coupled Model Intercomparison Project (CMIP5) streamflow data of Carson River were analyzed for 27 different statistical distributions. The best-fitted distribution underlying was used to forecast the 100yr flood (design flood). The data from 1950-2099 derived from 31 model and total 97 projections were used to predict the future streamflow. Delta change method is adopted to quantify the amount of future (2050-2099) flood. To determine the extent of flooding 3 scenarios (i) historic design flood, (ii) 500yr flood and (iii) future 100yr flood were routed on an HEC-RAS model, prepared using available terrain data. Some of the climate projection shows an extreme increase in future design flood. This study suggests an approach to quantify the future flood and floodplain using climate model projections. The study would provide helpful information to the facility manager, design engineer, and stakeholders.

  13. Variability in eddy sandbar dynamics during two decades of controlled flooding of the Colorado River in the Grand Canyon

    Science.gov (United States)

    Mueller, Erich R.; Grams, Paul E.; Hazel, Joseph E.; Schmidt, John C.

    2018-01-01

    Sandbars are iconic features of the Colorado River in the Grand Canyon, Arizona, U.S.A. Following completion of Glen Canyon Dam in 1963, sediment deficit conditions caused erosion of eddy sandbars throughout much of the 360 km study reach downstream from the dam. Controlled floods in 1996, 2004, and 2008 demonstrated that sand on the channel bed could be redistributed to higher elevations, and that floods timed to follow tributary sediment inputs would increase suspended sand concentrations during floods. Since 2012, a new management protocol has resulted in four controlled floods timed to follow large inputs of sand from a major tributary. Monitoring of 44 downstream eddy sandbars, initiated in 1990, shows that each controlled flood deposited significant amounts of sand and increased the size of subaerial sandbars. However, the magnitude of sandbar deposition varied from eddy to eddy, even over relatively short distances where main-stem suspended sediment concentrations were similar. Here, we characterize spatial and temporal trends in sandbar volume and site-scale (i.e., individual eddy) sediment storage as a function of flow, channel, and vegetation characteristics that reflect the reach-scale (i.e., kilometer-scale) hydraulic environment. We grouped the long-term monitoring sites based on geomorphic setting and used a principal component analysis (PCA) to correlate differences in sandbar behavior to changes in reach-scale geomorphic metrics. Sites in narrow reaches are less-vegetated, stage changes markedly with discharge, sandbars tend to remain dynamic, and sand storage change dominantly occurs in the eddy compared to the main channel. In wider reaches, where stage-change during floods may be half that of narrow sites, sandbars are more likely to be stabilized by vegetation, and floods tend to aggrade the vegetated sandbar surfaces. In these locations, deposition during controlled floods is more akin to floodplain sedimentation, and the elevation of sandbar

  14. ASN guide project. Protection of base nuclear installations against external flooding

    International Nuclear Information System (INIS)

    2010-01-01

    This guide aims at defining criteria to be taken into account to assess risks of flooding of a nuclear installation in case of external flooding, at proposing an acceptable method to assess such risks, at listing recommendations to define protection means adapted to the peculiarities of the flood risk and implemented by the operators with respect to the life phases of the installation, and in taking the climate change into account. The first part proposes an approach allowing the identification of reference situations which are to be taken into account for the flood risk. The second part deals with the quantification of parameters which characterize physical phenomena associated with these situations. The third part identifies the peculiarities of the flood risk as well as the guiding principles for designing options and protection mean selection with respect to a given flood risk

  15. Riparian plant community responses to increased flooding: a meta-analysis.

    Science.gov (United States)

    Garssen, Annemarie G; Baattrup-Pedersen, Annette; Voesenek, Laurentius A C J; Verhoeven, Jos T A; Soons, Merel B

    2015-08-01

    A future higher risk of severe flooding of streams and rivers has been projected to change riparian plant community composition and species richness, but the extent and direction of the expected change remain uncertain. We conducted a meta-analysis to synthesize globally available experimental evidence and assess the effects of increased flooding on (1) riparian adult plant and seedling survival, (2) riparian plant biomass and (3) riparian plant species composition and richness. We evaluated which plant traits are of key importance for the response of riparian plant species to flooding. We identified and analysed 53 papers from ISI Web of Knowledge which presented quantitative experimental results on flooding treatments and corresponding control situations. Our meta-analysis demonstrated how longer duration of flooding, greater depth of flooding and, particularly, their combination reduce seedling survival of most riparian species. Plant height above water level, ability to elongate shoots and plasticity in root porosity were decisive for adult plant survival and growth during longer periods of flooding. Both 'quiescence' and 'escape' proved to be successful strategies promoting riparian plant survival, which was reflected in the wide variation in survival (full range between 0 and 100%) under fully submerged conditions, while plants that protrude above the water level (>20 cm) almost all survive. Our survey confirmed that the projected increase in the duration and depth of flooding periods is sufficient to result in species shifts. These shifts may lead to increased or decreased riparian species richness depending on the nutrient, climatic and hydrological status of the catchment. Species richness was generally reduced at flooded sites in nutrient-rich catchments and sites that previously experienced relatively stable hydrographs (e.g. rain-fed lowland streams). Species richness usually increased at sites in desert and semi-arid climate regions (e.g. intermittent

  16. Integrated Urban Flood Analysis considering Optimal Operation of Flood Control Facilities in Urban Drainage Networks

    Science.gov (United States)

    Moon, Y. I.; Kim, M. S.; Choi, J. H.; Yuk, G. M.

    2017-12-01

    eavy rainfall has become a recent major cause of urban area flooding due to the climate change and urbanization. To prevent property damage along with casualties, a system which can alert and forecast urban flooding must be developed. Optimal performance of reducing flood damage can be expected of urban drainage facilities when operated in smaller rainfall events over extreme ones. Thus, the purpose of this study is to execute: A) flood forecasting system using runoff analysis based on short term rainfall; and B) flood warning system which operates based on the data from pump stations and rainwater storage in urban basins. In result of the analysis, it is shown that urban drainage facilities using short term rainfall forecasting data by radar will be more effective to reduce urban flood damage than using only the inflow data of the facility. Keywords: Heavy Rainfall, Urban Flood, Short-term Rainfall Forecasting, Optimal operating of urban drainage facilities. AcknowledgmentsThis research was supported by a grant (17AWMP-B066744-05) from Advanced Water Management Research Program (AWMP) funded by Ministry of Land, Infrastructure and Transport of Korean government.

  17. Birth of a megaproject: Political economy of flood control in bangladesh

    Science.gov (United States)

    Boyce, James K.

    1990-07-01

    A major flood control initiative has been launched in Bangladesh under the coordination of the World Bank. The bank's five-year Action Plan is intended to initiate a long-term investment program, the specifics of which remain to be determined. Long-term proposals under consideration include the construction of massive embankments along the great rivers of the Bangladesh delta. The wisdom of such a “structural solution” to Bangladesh's flood problems can be questioned on economic, environmental, and technical grounds. Regrettably, the decision-making process has not encouraged wide debate on these questions.

  18. Development of Integrated Flood Analysis System for Improving Flood Mitigation Capabilities in Korea

    Science.gov (United States)

    Moon, Young-Il; Kim, Jong-suk

    2016-04-01

    Recently, the needs of people are growing for a more safety life and secure homeland from unexpected natural disasters. Flood damages have been recorded every year and those damages are greater than the annual average of 2 trillion won since 2000 in Korea. It has been increased in casualties and property damages due to flooding caused by hydrometeorlogical extremes according to climate change. Although the importance of flooding situation is emerging rapidly, studies related to development of integrated management system for reducing floods are insufficient in Korea. In addition, it is difficult to effectively reduce floods without developing integrated operation system taking into account of sewage pipe network configuration with the river level. Since the floods result in increasing damages to infrastructure, as well as life and property, structural and non-structural measures should be urgently established in order to effectively reduce the flood. Therefore, in this study, we developed an integrated flood analysis system that systematized technology to quantify flood risk and flood forecasting for supporting synthetic decision-making through real-time monitoring and prediction on flash rain or short-term rainfall by using radar and satellite information in Korea. Keywords: Flooding, Integrated flood analysis system, Rainfall forecasting, Korea Acknowledgments This work was carried out with the support of "Cooperative Research Program for Agriculture Science & Technology Development (Project No. PJ011686022015)" Rural Development Administration, Republic of Korea

  19. Socio-economic Evaluation Of Different Alternatives For Flood Protection Within The Rivierenland-project

    Science.gov (United States)

    Boot, S. P.; van Ast, J. A.

    The Netherlands have a tradition of protecting land against flooding from the main rivers Rhine, Meuse and Scheldt by means of an extensive system of dikes. In recent years, however, this approach to protection has been increasingly questioned with re- gard to its sustainability and cost-effectiveness. The argument is that although the continued elevation of dikes may be technically feasible, there are several disadvan- tages to this approach. Firstly, a vast network of dikes requires a very high degree of organisation of water management, in which mistakes can not be afforded. Such a high degree of organisation may not always be maintainable in the future, due to changed economic or political circumstances. Secondly, it may not be the most cost- effective system for maintaining safety in the long term. Thirdly, it may not be the most desirable approach in terms of sustainability. One of the alternatives to contin- ued dike-elevation is the concept 'room for the river' ('ruimte voor de rivier'), which aims to give more space to rivers in the horizontal in stead of the vertical dimen- sion. This approach would reduce the risk of flooding, defined as the product of the probability and the consequences of flooding. In order to explore the long term con- sequences of both alternatives ('dike elevation' and 'room for the river'), the ministry of Verkeer en Waterstaat (Public Works, Transport and Water Management) started the 'Rivierenland'-project. The comparison of the alternatives mentioned was based on a fictitious project to adjust a region of The Netherlands, between the rivers Rhine and Meuse, to the concept of 'room for water'. The consequence of this adjustment would be that safety within that region would no longer be safeguarded by dikes, but by adjusting daily life to the 'demands of the water'. Part of the 'Rivierenland'-project was an analysis of the socio-economic costs and benefits of the alternative approaches. Within this analysis, a study was performed

  20. Growing magma chambers control the distribution of small-scale flood basalts.

    Science.gov (United States)

    Yu, Xun; Chen, Li-Hui; Zeng, Gang

    2015-11-19

    Small-scale continental flood basalts are a global phenomenon characterized by regular spatio-temporal distributions. However, no genetic mechanism has been proposed to explain the visible but overlooked distribution patterns of these continental basaltic volcanism. Here we present a case study from eastern China, combining major and trace element analyses with Ar-Ar and K-Ar dating to show that the spatio-temporal distribution of small-scale flood basalts is controlled by the growth of long-lived magma chambers. Evolved basalts (SiO2 > 47.5 wt.%) from Xinchang-Shengzhou, a small-scale Cenozoic flood basalt field in Zhejiang province, eastern China, show a northward younging trend over the period 9.4-3.0 Ma. With northward migration, the magmas evolved only slightly ((Na2O + K2O)/MgO = 0.40-0.66; TiO2/MgO = 0.23-0.35) during about 6 Myr (9.4-3.3 Ma). When the flood basalts reached the northern end of the province, the magmas evolved rapidly (3.3-3.0 Ma) through a broad range of compositions ((Na2O + K2O)/MgO = 0.60-1.28; TiO2/MgO = 0.30-0.57). The distribution and two-stage compositional evolution of the migrating flood basalts record continuous magma replenishment that buffered against magmatic evolution and induced magma chamber growth. Our results demonstrate that the magma replenishment-magma chamber growth model explains the spatio-temporal distribution of small-scale flood basalts.

  1. Variability in eddy sandbar dynamics during two decades of controlled flooding of the Colorado River in the Grand Canyon

    Science.gov (United States)

    Mueller, Erich R.; Grams, Paul E.; Hazel, Joseph E.; Schmidt, John C.

    2018-01-01

    Sandbars are iconic features of the Colorado River in the Grand Canyon, Arizona, U.S.A. Following completion of Glen Canyon Dam in 1963, sediment deficit conditions caused erosion of eddy sandbars throughout much of the 360 km study reach downstream from the dam. Controlled floods in 1996, 2004, and 2008 demonstrated that sand on the channel bed could be redistributed to higher elevations, and that floods timed to follow tributary sediment inputs would increase suspended sand concentrations during floods. Since 2012, a new management protocol has resulted in four controlled floods timed to follow large inputs of sand from a major tributary. Monitoring of 44 downstream eddy sandbars, initiated in 1990, shows that each controlled flood deposited significant amounts of sand and increased the size of subaerial sandbars. However, the magnitude of sandbar deposition varied from eddy to eddy, even over relatively short distances where main-stem suspended sediment concentrations were similar. Here, we characterize spatial and temporal trends in sandbar volume and site-scale (i.e., individual eddy) sediment storage as a function of flow, channel, and vegetation characteristics that reflect the reach-scale (i.e., kilometer-scale) hydraulic environment. We grouped the long-term monitoring sites based on geomorphic setting and used a principal component analysis (PCA) to correlate differences in sandbar behavior to changes in reach-scale geomorphic metrics. Sites in narrow reaches are less-vegetated, stage changes markedly with discharge, sandbars tend to remain dynamic, and sand storage change dominantly occurs in the eddy compared to the main channel. In wider reaches, where stage-change during floods may be half that of narrow sites, sandbars are more likely to be stabilized by vegetation, and floods tend to aggrade the vegetated sandbar surfaces. In these locations, deposition during controlled floods is more akin to floodplain sedimentation, and the elevation of sandbar

  2. River Activism, “Levees-Only” and the Great Mississippi Flood of 1927

    Directory of Open Access Journals (Sweden)

    Ned Randolph

    2018-02-01

    Full Text Available This article investigates media coverage of 19th and early 20th century river activism and its effect on federal policy to control the Mississippi River. The U.S. Army Corps of Engineers’ “levees-only” policy—which joined disparate navigation and flood control interests—is largely blamed for the Great Flood of 1927, called the largest peacetime disaster in American history. River activists organized annual conventions, and later, professional lobbies organized media campaigns up and down the Mississippi River to sway public opinion and pressure Congress to fund flood control and river navigation projects. Annual river conventions drew thousands of delegates such as plantation owners, shippers, bankers, chambers of commerce, governors, congressmen, mayors and cabinet members with interests on the Mississippi River. Public pressure on Congress successfully captured millions of federal dollars to protect property, drain swamps for development, subsidize local levee districts and influence river policy.

  3. Characterization of flood and precipitation events in Southwestern Germany and stochastic simulation of extreme precipitation (Project FLORIS-SV)

    Science.gov (United States)

    Florian, Ehmele; Michael, Kunz

    2016-04-01

    Several major flood events occurred in Germany in the past 15-20 years especially in the eastern parts along the rivers Elbe and Danube. Examples include the major floods of 2002 and 2013 with an estimated loss of about 2 billion Euros each. The last major flood events in the State of Baden-Württemberg in southwest Germany occurred in the years 1978 and 1993/1994 along the rivers Rhine and Neckar with an estimated total loss of about 150 million Euros (converted) each. Flood hazard originates from a combination of different meteorological, hydrological and hydraulic processes. Currently there is no defined methodology available for evaluating and quantifying the flood hazard and related risk for larger areas or whole river catchments instead of single gauges. In order to estimate the probable maximum loss for higher return periods (e.g. 200 years, PML200), a stochastic model approach is designed since observational data are limited in time and space. In our approach, precipitation is linearly composed of three elements: background precipitation, orographically-induces precipitation, and a convectively-driven part. We use linear theory of orographic precipitation formation for the stochastic precipitation model (SPM), which is based on fundamental statistics of relevant atmospheric variables. For an adequate number of historic flood events, the corresponding atmospheric conditions and parameters are determined in order to calculate a probability density function (pdf) for each variable. This method involves all theoretically possible scenarios which may not have happened, yet. This work is part of the FLORIS-SV (FLOod RISk Sparkassen Versicherung) project and establishes the first step of a complete modelling chain of the flood risk. On the basis of the generated stochastic precipitation event set, hydrological and hydraulic simulations will be performed to estimate discharge and water level. The resulting stochastic flood event set will be used to quantify the

  4. 76 FR 39091 - San Luis Obispo Flood Control and Water Conservation District; Notice of Effectiveness of Surrender

    Science.gov (United States)

    2011-07-05

    ... Flood Control and Water Conservation District; Notice of Effectiveness of Surrender On October 27, 1981... \\1\\ to the San Luis Obispo Flood Control and Water Conservation District (District) for the Lopez... and Water Conservation District, 17 FERC ] 62,113 (1981). On October 24, 2005, the District filed an...

  5. Mental health impacts of flooding: a controlled interrupted time series analysis of prescribing data in England.

    Science.gov (United States)

    Milojevic, Ai; Armstrong, Ben; Wilkinson, Paul

    2017-10-01

    There is emerging evidence that people affected by flooding suffer adverse impacts on their mental well-being, mostly based on self-reports. We examined prescription records for drugs used in the management of common mental disorder among primary care practices located in the vicinity of recent large flood events in England, 2011-2014. A controlled interrupted time series analysis was conducted of the number of prescribing items for antidepressant drugs in the year before and after the flood onset. Pre-post changes were compared by distance of the practice from the inundated boundaries among 930 practices located within 10 km of a flood. After control for deprivation and population density, there was an increase of 0.59% (95% CI 0.24 to 0.94) prescriptions in the postflood year among practices located within 1 km of a flood over and above the change observed in the furthest distance band. The increase was greater in more deprived areas. This study suggests an increase in prescribed antidepressant drugs in the year after flooding in primary care practices close to recent major floods in England. The degree to which the increase is actually concentrated in those flooded can only be determined by more detailed linkage studies. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2017. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  6. Flood forecasting for the upper reach of the Red River Basin, North ...

    African Journals Online (AJOL)

    This is a multilayer feed forward neural network with a back- ... 2 with the input layer, one hidden layer, andthe output layer with only one node . Theactivation ..... Thepaper is aresult of theresearch project entitled FLOod Control. Decision ...

  7. Mapping flood and flooding potential indices: a methodological approach to identifying areas susceptible to flood and flooding risk. Case study: the Prahova catchment (Romania)

    Science.gov (United States)

    Zaharia, Liliana; Costache, Romulus; Prăvălie, Remus; Ioana-Toroimac, Gabriela

    2017-04-01

    Given that floods continue to cause yearly significant worldwide human and material damages, flood risk mitigation is a key issue and a permanent challenge in developing policies and strategies at various spatial scales. Therefore, a basic phase is elaborating hazard and flood risk maps, documents which are an essential support for flood risk management. The aim of this paper is to develop an approach that allows for the identification of flash-flood and flood-prone susceptible areas based on computing and mapping of two indices: FFPI (Flash-Flood Potential Index) and FPI (Flooding Potential Index). These indices are obtained by integrating in a GIS environment several geographical variables which control runoff (in the case of the FFPI) and favour flooding (in the case of the FPI). The methodology was applied in the upper (mountainous) and middle (hilly) catchment of the Prahova River, a densely populated and socioeconomically well-developed area which has been affected repeatedly by water-related hazards over the past decades. The resulting maps showing the spatialization of the FFPI and FPI allow for the identification of areas with high susceptibility to flashfloods and flooding. This approach can provide useful mapped information, especially for areas (generally large) where there are no flood/hazard risk maps. Moreover, the FFPI and FPI maps can constitute a preliminary step for flood risk and vulnerability assessment.

  8. Autonomous watersheds: Reducing flooding and stream erosion through real-time control

    Science.gov (United States)

    Kerkez, B.; Wong, B. P.

    2017-12-01

    We introduce an analytical toolchain, based on dynamical system theory and feedback control, to determine how many control points (valves, gates, pumps, etc.) are needed to transform urban watersheds from static to adaptive. Advances and distributed sensing and control stand to fundamentally change how we manage urban watersheds. In lieu of new and costly infrastructure, the real-time control of stormwater systems will reduce flooding, mitigate stream erosion, and improve the treatment of polluted runoff. We discuss the how open source technologies, in the form of wireless sensor nodes and remotely-controllable valves (open-storm.org), have been deployed to build "smart" stormwater systems in the Midwestern US. Unlike "static" infrastructure, which cannot readily adapt to changing inputs and land uses, these distributed control assets allow entire watersheds to be reconfigured on a storm-by-storm basis. Our results show how the control of even just a few valves within urban catchments (1-10km^2) allows for the real-time "shaping" of hydrographs, which reduces downstream erosion and flooding. We also introduce an equivalence framework that can be used by decision-makers to objectively compare investments into "smart" system to more traditional solutions, such as gray and green stormwater infrastructure.

  9. The character and causes of flash flood occurrence changes in mountainous small basins of Southern California under projected climatic change

    Directory of Open Access Journals (Sweden)

    Theresa M. Modrick

    2015-03-01

    Full Text Available Study region: Small watersheds (O[25 km2] in the mountain regions of southern California comprise the study region. Study focus: This paper examines changes in flash flood occurrence in southern California resulting from projected climatic change. The methodology synthesizes elements of meteorological modeling, hydrology and geomorphology into an integrated modeling approach to define flash flood occurrence in a systematic and consistent way on a regional basis with high spatial and temporal resolution appropriate for flash flooding. A single climate model with three-dimensional atmospheric detail was used as input to drive simulations for historical and future periods. New hydrological insights for the region: Results indicate an increase in flash flood occurrence for the study region. For two distributed hydrologic models employed, the increase in flash flood occurrence frequency is on average between 30% and 40%. Regional flash flood occurrence is characterized by near saturation of the upper soil layer, and wider ranges in lower soil layer saturation and in precipitation. Overall, a decrease in the total number of precipitation events was found, although with increased precipitation intensity, increased event duration, and higher soil saturation conditions for the 21st century. This combination could signify more hazardous conditions, with fewer precipitation events but higher rainfall intensity and over soils with higher initial soil moisture saturation, leading to more frequent occurrence of flash floods. Keywords: Flash flooding, Climate change, Soil moisture, Precipitation, Distributed hydrologic modeling

  10. Societal impacts and vulnerability to floods in Bangladesh and Nepal

    Directory of Open Access Journals (Sweden)

    Tanvir H. Dewan

    2015-03-01

    Full Text Available Bangladesh and Nepal lie between the Himalayas and low-lying coasts of the Bay of Bengal and are traversed by hundreds of rivers and tributaries. Historical data shows that, since 1970, the scale, intensity and duration of floods have increased in Bangladesh and Nepal, causing grave human suffering; disruptions in normal life and activity, damages of infrastructure, crops and agricultural land with severe impacts on the economy. Bangladesh is affected by torrential rain, glacier melt, upstream water flow and tidal surges. In 1988, Bangladesh experienced one of the most severe floods of the twentieth century which aroused significant concern internationally and triggered the Bangladesh Action Plan for Flood Control. The Government of Bangladesh (GOB has so far constructed a number of flood shelters and carried out 482 water and flood control projects involving flood protection embankments, drainage channels, sluice gates and regulators on different rivers and canals. These also provided safety measures against inundation by tidal waves, storm-surges and flooding. The Terai region of Nepal is highly prone to hydrological risks including torrential rain, floods, glaciers resulting in erosion and landslides. The Government of Nepal (GON has implemented different mitigation measures mainly early warning awareness, rescue measure, relief, and post-flood rehabilitation programs etc. Disaster Management Bureaus of both the countries have already conducted many trainings, workshops and seminars to disseminate scientific knowledge and coping up practices to disaster managers and to create public awareness. Besides the contemporary approaches to mitigating flood effects, people of these countries have coped with floods through generations relying on traditional/indigenous knowledge and other local adaptation practices. It is crucial that along with scientific process, indigenous, traditional and conventional practices are to be integrated for a national

  11. Study on effectiveness of flood control based on risk level: case study of Kampung Melayu Village and Bukit Duri Village

    Directory of Open Access Journals (Sweden)

    Farid Mohammad

    2017-01-01

    Full Text Available Jakarta, the capital city of Indonesia, experiences flood which causes activities disruption and losses almost every year. Many studies have been done to mitigate the impact of flooding. Most of them focus on reducing the inundated area as an indicator of the effectiveness of flood control. This study aims to evaluate the effectiveness of several flood control alternatives based on risk level reduction. The case study is located in Kampung Melayu Village and Bukit Duri Village which are densely populated with several economic area and almost every year experiencing severe flooding in Jakarta. Risk level analysis was carried out by the method based on guidelines issued by the Head of National Disaster Management Agency (BNPB No. 2/2012 with few modifications. The analysis is conducted on five alternatives of flood control which are diversion channel to East Flood Canal (KBT, diversion channel to the West Flood Canal (KBB in Pasar Minggu, river improvement, capacity enhancement on all components, and capacity enhancement focusing on one component. From the results, it is showed that enhancing capacity which focus on preparedness component by two levels are the best in terms of investment value to risk level reduction.

  12. Probabilistic Flood Defence Assessment Tools

    Directory of Open Access Journals (Sweden)

    Slomp Robert

    2016-01-01

    Full Text Available The WTI2017 project is responsible for the development of flood defence assessment tools for the 3600 km of Dutch primary flood defences, dikes/levees, dunes and hydraulic structures. These tools are necessary, as per January 1st 2017, the new flood risk management policy for the Netherlands will be implemented. Then, the seven decades old design practice (maximum water level methodology of 1958 and two decades old safety standards (and maximum hydraulic load methodology of 1996 will formally be replaced by a more risked based approach for the national policy in flood risk management. The formal flood defence assessment is an important part of this new policy, especially for flood defence managers, since national and regional funding for reinforcement is based on this assessment. This new flood defence policy is based on a maximum allowable probability of flooding. For this, a maximum acceptable individual risk was determined at 1/100 000 per year, this is the probability of life loss of for every protected area in the Netherlands. Safety standards of flood defences were then determined based on this acceptable individual risk. The results were adjusted based on information from cost -benefit analysis, societal risk and large scale societal disruption due to the failure of critical infrastructure e.g. power stations. The resulting riskbased flood defence safety standards range from a 300 to a 100 000 year return period for failure. Two policy studies, WV21 (Safety from floods in the 21st century and VNK-2 (the National Flood Risk in 2010 provided the essential information to determine the new risk based safety standards for flood defences. The WTI2017 project will provide the safety assessment tools based on these new standards and is thus an essential element for the implementation of this policy change. A major issue to be tackled was the development of user-friendly tools, as the new assessment is to be carried out by personnel of the

  13. Post Waterflood CO2 Miscible Flood in Light Oil, Fluvial-Dominated Deltaic Reservoir (Pre-Work and Project Proposal), Class I

    Energy Technology Data Exchange (ETDEWEB)

    Bou-Mikael, Sami

    2002-02-05

    This project outlines a proposal to improve the recovery of light oil from waterflooded fluvial dominated deltaic (FDD) reservoir through a miscible carbon dioxide (CO2) flood. The site is the Port Neches Field in Orange County, Texas. The field is well explored and well exploited. The project area is 270 acres within the Port Neches Field.

  14. Flood Risk Management in the People’s Republic of China: Learning to Live with Flood Risk

    OpenAIRE

    Asian Development Bank (ADB); Asian Development Bank (ADB); Asian Development Bank (ADB); Asian Development Bank (ADB)

    2012-01-01

    This publication presents a shift in the People’s Republic of China from flood control depending on structural measures to integrated flood management using both structural and non-structural measures. The core of the new concept of integrated flood management is flood risk management. Flood risk management is based on an analysis of flood hazard, exposure to flood hazard, and vulnerability of people and property to danger. It is recommended that people learn to live with flood risks, gaining...

  15. Global drivers of future river flood risk

    Science.gov (United States)

    Winsemius, Hessel C.; Aerts, Jeroen C. J. H.; van Beek, Ludovicus P. H.; Bierkens, Marc F. P.; Bouwman, Arno; Jongman, Brenden; Kwadijk, Jaap C. J.; Ligtvoet, Willem; Lucas, Paul L.; van Vuuren, Detlef P.; Ward, Philip J.

    2016-04-01

    Understanding global future river flood risk is a prerequisite for the quantification of climate change impacts and planning effective adaptation strategies. Existing global flood risk projections fail to integrate the combined dynamics of expected socio-economic development and climate change. We present the first global future river flood risk projections that separate the impacts of climate change and socio-economic development. The projections are based on an ensemble of climate model outputs, socio-economic scenarios, and a state-of-the-art hydrologic river flood model combined with socio-economic impact models. Globally, absolute damage may increase by up to a factor of 20 by the end of the century without action. Countries in Southeast Asia face a severe increase in flood risk. Although climate change contributes significantly to the increase in risk in Southeast Asia, we show that it is dwarfed by the effect of socio-economic growth, even after normalization for gross domestic product (GDP) growth. African countries face a strong increase in risk mainly due to socio-economic change. However, when normalized to GDP, climate change becomes by far the strongest driver. Both high- and low-income countries may benefit greatly from investing in adaptation measures, for which our analysis provides a basis.

  16. Flood Risk and Flood hazard maps - Visualisation of hydrological risks

    International Nuclear Information System (INIS)

    Spachinger, Karl; Dorner, Wolfgang; Metzka, Rudolf; Serrhini, Kamal; Fuchs, Sven

    2008-01-01

    Hydrological models are an important basis of flood forecasting and early warning systems. They provide significant data on hydrological risks. In combination with other modelling techniques, such as hydrodynamic models, they can be used to assess the extent and impact of hydrological events. The new European Flood Directive forces all member states to evaluate flood risk on a catchment scale, to compile maps of flood hazard and flood risk for prone areas, and to inform on a local level about these risks. Flood hazard and flood risk maps are important tools to communicate flood risk to different target groups. They provide compiled information to relevant public bodies such as water management authorities, municipalities, or civil protection agencies, but also to the broader public. For almost each section of a river basin, run-off and water levels can be defined based on the likelihood of annual recurrence, using a combination of hydrological and hydrodynamic models, supplemented by an analysis of historical records and mappings. In combination with data related to the vulnerability of a region risk maps can be derived. The project RISKCATCH addressed these issues of hydrological risk and vulnerability assessment focusing on the flood risk management process. Flood hazard maps and flood risk maps were compiled for Austrian and German test sites taking into account existing national and international guidelines. These maps were evaluated by eye-tracking using experimental graphic semiology. Sets of small-scale as well as large-scale risk maps were presented to test persons in order to (1) study reading behaviour as well as understanding and (2) deduce the most attractive components that are essential for target-oriented risk communication. A cognitive survey asking for negative and positive aspects and complexity of each single map complemented the experimental graphic semiology. The results indicate how risk maps can be improved to fit the needs of different user

  17. The model of flood control using servqual method and importance performance analysis in Surakarta City – Indonesia

    Science.gov (United States)

    Titi Purwantini, V.; Sutanto, Yusuf

    2018-05-01

    This research is to create a model of flood control in the city of Surakarta using Servqual method and Importance Performance Analysis. Service quality is generally defined as the overall assessment of a service by the customersor the extent to which a service meets customer’s needs or expectations. The purpose of this study is to find the first model of flood control that is appropriate to the condition of the community. Surakarta This means looking for a model that can provide satisfactory service for the people of Surakarta who are in the location of the flood. The second is to find the right model to improve service performance of Surakarta City Government in serving the people in flood location. The method used to determine the satisfaction of the public on the quality of service is to see the difference in the quality of service expected by the community with the reality. This method is Servqual Method While to assess the performance of city government officials is by comparing the actual performance with the quality of services provided, this method is This means looking for a model that can provide satisfactory service for the people of Surakarta who are in the location of the flood.The second is to find the right model to improve service performance of Surakarta City Government in serving the people in flood location. The method used to determine the satisfaction of the public on the quality of service is to see the difference in the quality of service expected by the community with the reality. This method is Servqual Method While to assess the performance of city government officials is by comparing the actual performance with the quality of services provided, this method is Importance Performance Analysis. Samples were people living in flooded areas in the city of Surakarta. Result this research is Satisfaction = Responsiveness+ Realibility + Assurance + Empathy+ Tangible (Servqual Model) and Importance Performance Analysis is From Cartesian diagram

  18. The geomorphic effectiveness of a large flood on the Rio Grande in the Big Bend region: insights on geomorphic controls and post-flood geomorphic response

    Science.gov (United States)

    Dean, David J.; Schmidt, John C.

    2013-01-01

    Since the 1940s, the Rio Grande in the Big Bend region has undergone long periods of channel narrowing, which have been occasionally interrupted by rare, large floods that widen the channel (termed a channel reset). The most recent channel reset occurred in 2008 following a 17-year period of extremely low stream flow and rapid channel narrowing. Flooding was caused by precipitation associated with the remnants of tropical depression Lowell in the Rio Conchos watershed, the largest tributary to the Rio Grande. Floodwaters approached 1500 m3/s (between a 13 and 15 year recurrence interval) and breached levees, inundated communities, and flooded the alluvial valley of the Rio Grande; the wetted width exceeding 2.5 km in some locations. The 2008 flood had the 7th largest magnitude of record, however, conveyed the largest volume of water than any other flood. Because of the narrow pre-flood channel conditions, record flood stages occurred. We used pre- and post-flood aerial photographs, channel and floodplain surveys, and 1-dimensional hydraulic models to quantify the magnitude of channel change, investigate the controls of flood-induced geomorphic changes, and measure the post-flood response of the widened channel. These analyses show that geomorphic changes included channel widening, meander migration, avulsions, extensive bar formation, and vertical floodplain accretion. Reach-averaged channel widening between 26 and 52% occurred, but in some localities exceeded 500%. The degree and style of channel response was related, but not limited to, three factors: 1) bed-load supply and transport, 2) pre-flood channel plan form, and 3) rapid declines in specific stream power downstream of constrictions and areas of high channel bed slope. The post-flood channel response has consisted of channel contraction through the aggradation of the channel bed and the formation of fine-grained benches inset within the widened channel margins. The most significant post-flood geomorphic

  19. A Methodology to Define Flood Resilience

    Science.gov (United States)

    Tourbier, J.

    2012-04-01

    Flood resilience has become an internationally used term with an ever-increasing number of entries on the Internet. The SMARTeST Project is looking at approaches to flood resilience through case studies at cities in various countries, including Washington D.C. in the United States. In light of U.S. experiences a methodology is being proposed by the author that is intended to meet ecologic, spatial, structural, social, disaster relief and flood risk aspects. It concludes that: "Flood resilience combines (1) spatial, (2) structural, (3) social, and (4) risk management levels of flood preparedness." Flood resilience should incorporate all four levels, but not necessarily with equal emphasis. Stakeholders can assign priorities within different flood resilience levels and the considerations they contain, dividing 100% emphasis into four levels. This evaluation would be applied to planned and completed projects, considering existing conditions, goals and concepts. We have long known that the "road to market" for the implementation of flood resilience is linked to capacity building of stakeholders. It is a multidisciplinary enterprise, involving the integration of all the above aspects into the decision-making process. Traditional flood management has largely been influenced by what in the UK has been called "Silo Thinking", involving constituent organizations that are responsible for different elements, and are interested only in their defined part of the system. This barrier to innovation also has been called the "entrapment effect". Flood resilience is being defined as (1) SPATIAL FLOOD RESILIENCE implying the management of land by floodplain zoning, urban greening and management to reduce storm runoff through depression storage and by practicing Sustainable Urban Drainage (SUD's), Best Management Practices (BMP's, or Low Impact Development (LID). Ecologic processes and cultural elements are included. (2) STRUCTURAL FLOOD RESILIENCE referring to permanent flood defense

  20. Ecosystem ecology meets adaptive management: food web response to a controlled flood on the Colorado River, Glen Canyon

    Science.gov (United States)

    Cross, Wyatt F.; Baxter, Colden V.; Donner, Kevin C.; Rosi-Marshall, Emma J.; Kennedy, Theodore A.; Hall, Robert O.; Wellard Kelly, Holly A.; Rogers, R. Scott

    2011-01-01

    Large dams have been constructed on rivers to meet human demands for water, electricity, navigation, and recreation. As a consequence, flow and temperature regimes have been altered, strongly affecting river food webs and ecosystem processes. Experimental high-flow dam releases, i.e., controlled floods, have been implemented on the Colorado River, USA, in an effort to reestablish pulsed flood events, redistribute sediments, improve conditions for native fishes, and increase understanding of how dam operations affect physical and biological processes. We quantified secondary production and organic matter flows in the food web below Glen Canyon dam for two years prior and one year after an experimental controlled flood in March 2008. Invertebrate biomass and secondary production declined significantly following the flood (total biomass, 55% decline; total production, 56% decline), with most of the decline driven by reductions in two nonnative invertebrate taxa, Potamopyrgus antipodarum and Gammarus lacustris. Diatoms dominated the trophic basis of invertebrate production before and after the controlled flood, and the largest organic matter flows were from diatoms to the three most productive invertebrate taxa (P. antipodarum, G. lacustris, and Tubificida). In contrast to invertebrates, production of rainbow trout (Oncorhynchus mykiss) increased substantially (194%) following the flood, despite the large decline in total secondary production of the invertebrate assemblage. This counterintuitive result is reconciled by a post-flood increase in production and drift concentrations of select invertebrate prey (i.e., Chironomidae and Simuliidae) that supported a large proportion of trout production but had relatively low secondary production. In addition, interaction strengths, measured as species impact values, were strongest between rainbow trout and these two taxa before and after the flood, demonstrating that the dominant consumer—resource interactions were not

  1. Flood early warning system : Design, implementation and computational modules

    NARCIS (Netherlands)

    Krzhizhanovskaya, V.V.; Shirshov, G.S.; Melnikova, N.B.; Belleman, R.G.; Rusadi, F.I.; Broekhuijsen, B.J.; Gouldby, B.P.; Lhomme, J.; Balis, B.; Bubak, M.; Pyayt, A.L.; Mokhov, I.I.; Ozhigin, A.V.; Lang, B.; Meijer, R.J.

    2011-01-01

    We present a prototype of the flood early warning system (EWS) developed within the UrbanFlood FP7 project. The system monitors sensor networks installed in flood defenses (dikes, dams, embankments, etc.), detects sensor signal abnormalities, calculates dike failure probability, and simulates

  2. Green River Formation Water Flood Demonstration Project: Final report. [October 21, 1992-April, 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Deo, M.D. [Dept. of Chemical and Fuels Engineering, University of Utah, Salt Lake City (US); Dyer, J.E.; Lomax, J.D. [Inland Resources, Inc., Lomax Exploration Co., Salt Lake City, UT (US); Nielson, D.L.; Lutz, S.J. [Energy and Geoscience Institute at the University of Utah, Salt Lake City (US)

    1996-11-01

    The objectives were to understand the oil production mechanisms in the Monument Butte unit via reservoir characterization and reservoir simulations and to transfer the water flooding technology to similar units in the vicinity, particularly the Travis and the Boundary units. Comprehensive reservoir characterization and reservoir simulations of the Monument Butte, Travis and Boundary units were presented in the two published project yearly reports. The primary and the secondary production from the Monument Butte unit were typical of oil production from an undersaturated oil reservoir close to its bubble point. The water flood in the smaller Travis unit appeared affected by natural and possibly by large interconnecting hydraulic fractures. Water flooding the boundary unit was considered more complicated due to the presence of an oil water contact in one of the wells. The reservoir characterization activity in the project basically consisted of extraction and analysis of a full diameter c ore, Formation Micro Imaging logs from several wells and Magnetic Resonance Imaging logs from two wells. In addition, several side-wall cores were drilled and analyzed, oil samples from a number of wells were physically and chemically characterized (using gas chromatography), oil-water relative permeabilities were measured and pour points and cloud points of a few oil samples were determined. The reservoir modeling activity comprised of reservoir simulation of all the three units at different scales and near well-bore modeling of the wax precipitation effects. The reservoir characterization efforts identified new reservoirs in the Travis and the Boundary units. The reservoir simulation activities established the extent of pressurization of the sections of the reservoirs in the immediate vicinity of the Monument Butte unit. This resulted in a major expansion of the unit and the production from this expanded unit increased from about 300 barrels per day to about 2000 barrels per day.

  3. Green River Formation Water Flood Demonstration Project: Final report, October 21, 1992-April, 30, 1996

    International Nuclear Information System (INIS)

    Deo, M.D.; Dyer, J.E.; Lomax, J.D.; Nielson, D.L.; Lutz, S.J.

    1996-01-01

    The objectives were to understand the oil production mechanisms in the Monument Butte unit via reservoir characterization and reservoir simulations and to transfer the water flooding technology to similar units in the vicinity, particularly the Travis and the Boundary units. Comprehensive reservoir characterization and reservoir simulations of the Monument Butte, Travis and Boundary units were presented in the two published project yearly reports. The primary and the secondary production from the Monument Butte unit were typical of oil production from an undersaturated oil reservoir close to its bubble point. The water flood in the smaller Travis unit appeared affected by natural and possibly by large interconnecting hydraulic fractures. Water flooding the boundary unit was considered more complicated due to the presence of an oil water contact in one of the wells. The reservoir characterization activity in the project basically consisted of extraction and analysis of a full diameter c ore, Formation Micro Imaging logs from several wells and Magnetic Resonance Imaging logs from two wells. In addition, several side-wall cores were drilled and analyzed, oil samples from a number of wells were physically and chemically characterized (using gas chromatography), oil-water relative permeabilities were measured and pour points and cloud points of a few oil samples were determined. The reservoir modeling activity comprised of reservoir simulation of all the three units at different scales and near well-bore modeling of the wax precipitation effects. The reservoir characterization efforts identified new reservoirs in the Travis and the Boundary units. The reservoir simulation activities established the extent of pressurization of the sections of the reservoirs in the immediate vicinity of the Monument Butte unit. This resulted in a major expansion of the unit and the production from this expanded unit increased from about 300 barrels per day to about 2000 barrels per day

  4. INVESTIGATION OF QUANTIFICATION OF FLOOD CONTROL AND WATER UTILIZATION EFFECT OF RAINFALL INFILTRATION FACILITY BY USING WATER BALANCE ANALYSIS MODEL

    OpenAIRE

    文, 勇起; BUN, Yuki

    2013-01-01

    In recent years, many flood damage and drought attributed to urbanization has occurred. At present infiltration facility is suggested for the solution of these problems. Based on this background, the purpose of this study is investigation of quantification of flood control and water utilization effect of rainfall infiltration facility by using water balance analysis model. Key Words : flood control, water utilization , rainfall infiltration facility

  5. Bathymetric survey of the Cayuga Inlet flood-control channel and selected tributaries in Ithaca, New York, 2016

    Science.gov (United States)

    Wernly, John F.; Nystrom, Elizabeth A.; Coon, William F.

    2017-09-08

    From July 14 to July 20, 2016, the U.S. Geological Survey, in cooperation with the City of Ithaca, New York, and the New York State Department of State, surveyed the bathymetry of the Cayuga Inlet flood-control channel and the mouths of selected tributaries to Cayuga Inlet and Cayuga Lake in Ithaca, N.Y. The flood-control channel, built by the U.S. Army Corps of Engineers between 1965 and 1970, was designed to convey flood flows from the Cayuga Inlet watershed through the City of Ithaca and minimize possible flood damages. Since that time, the channel has infrequently been maintained by dredging, and sediment accumulation and resultant shoaling have greatly decreased the conveyance of the channel and its navigational capability.U.S. Geological Survey personnel collected bathymetric data by using an acoustic Doppler current profiler. The survey produced a dense dataset of water depths that were converted to bottom elevations. These elevations were then used to generate a geographic information system bathymetric surface. The bathymetric data and resultant bathymetric surface show the current condition of the channel and provide the information that governmental agencies charged with maintaining the Cayuga Inlet for flood-control and navigational purposes need to make informed decisions regarding future maintenance measures.

  6. Post Waterflood CO2 Miscible Flood in Light Oil, Fluvial-Dominated Deltaic Reservoir (Pre-Work and Project Proposal), Class I; FINAL

    International Nuclear Information System (INIS)

    Bou-Mikael, Sami

    2002-01-01

    This project outlines a proposal to improve the recovery of light oil from waterflooded fluvial dominated deltaic (FDD) reservoir through a miscible carbon dioxide (CO2) flood. The site is the Port Neches Field in Orange County, Texas. The field is well explored and well exploited. The project area is 270 acres within the Port Neches Field

  7. Hydrological and meteorological aspects of floods in the Alps: an overview

    Directory of Open Access Journals (Sweden)

    Baldassare Bacchi

    2003-01-01

    Full Text Available This introductory paper presents and summarises recent research on meteorological and hydrological aspects of floods in the Alps. The research activities were part of the international research project RAPHAEL (Runoff and Atmospheric Processes for flood HAzard forEcasting and controL together with experiments within the Special Observing Period-SOP conducted in autumn 1999 for the Mesoscale Alpine Programme —MAP. The investigations were based on both field experiments and numerical simulations, using meteorological and hydrological models, of ten major floods that occurred in the past decade in the European Alps. The two basins investigated were the Ticino (6599 km2 at the Lago Maggiore outlet on the southern side of the Alps and the Ammer catchment (709 km2 in the Bavarian Alps. These catchments and their sub-catchments cover an appropriate range of spatial scales with which to investigate and test in an operational context the potential of both mesoscale meteorological and distributed hydrological models for flood forecasting. From the data analyses and model simulations described in this Special Issue, the major sources of uncertainties for flood forecasts in mid-size mountain basins are outlined and the accuracy flood forecasts is assessed. Keywords: floods, mountain hydrology, meteorological models, Alps

  8. Dealing with rainfall forecast uncertainties in real-time flood control along the Demer river

    Directory of Open Access Journals (Sweden)

    Vermuyten Evert

    2016-01-01

    Full Text Available Real-time Model Predictive Control (MPC of hydraulic structures strongly reduces flood consequences under ideal circumstances. The performance of such flood control may, however, be significantly affected by uncertainties. This research quantifies the influence of rainfall forecast uncertainties and related uncertainties in the catchment rainfall-runoff discharges on the control performance for the Herk river case study in Belgium. To limit the model computational times, a fast conceptual model is applied. It is calibrated to a full hydrodynamic river model. A Reduced Genetic Algorithm is used as optimization method. Next to the analysis of the impact of the rainfall forecast uncertainties on the control performance, a Multiple Model Predictive Control (MMPC approach is tested to reduce this impact. Results show that the deterministic MPC-RGA outperforms the MMPC and that it is inherently robust against rainfall forecast uncertainties due to its receding horizon strategy.

  9. Extending flood damage assessment methodology to include ...

    African Journals Online (AJOL)

    Optimal and sustainable flood plain management, including flood control, can only be achieved when the impacts of flood control measures are considered for both the man-made and natural environments, and the sociological aspects are fully considered. Until now, methods/models developed to determine the influences ...

  10. Contribution of Earth Observation data to flood risk mapping in the framework of the NATO SFP 'TIGRU' Project

    International Nuclear Information System (INIS)

    Stancalie, Gheorghe; Alecu, Corina; Craciunescul, Vasile; Diamandi, Andrei; Oancea, Simona; Brakenridge, Robert G.

    2004-01-01

    An important contribution of Earth Observation (EO) derived information in the topic of managing flooding connected phenomena could, be envisaged at the level of mapping aspects. EO satellites can provide necessary information for flood hazard and vulnerability assessment and mapping, which are directly used in the decision-making process. The EO data-derived information of the land cover/land use is important because it makes possible periodical updating and comparisons, and thus contribute to characterize the human presence and to provide elements on the vulnerability aspects, as well as the evaluation of the impact of the flooding. In order to obtain high-level thematic products the data extracted from the EO images must be integrated with other non-space ancillary data (topographical, penological, meteorological data) and hydrologic/hydraulic models outputs. This approach may be used in different phases of establishing the sensitive areas such as: the management of the database-built up from the ensemble of the spatially geo-referenced information; the elaboration of the risk indices from morpho-hydro graphical, meteorological and hydrological data; the interfacing with the models in order to improve their compatibility with input data; recovery of results and the possibility to work out scenarios; presentation of results as synthesis maps easy to access and interpret, additionally adequate to be combined with other information layouts resulted from the GIS database. The paper presents the specific methods, developed in the framework of the NATO SfP 'TIGRU' project 'Monitoring of extreme flood events in Romania and Hungary using EO data' for deriving satellite-based applications and products for flood risk mapping. The study area is situated in the Crisul Alb - Crisul Negru - K6r6s transboundary basin, crossing the Romanian - Hungarian border. Using the optical and microwave data supplied by the new satellite sensors (U.S. DMSP/Quikscat, LANDSAT-7/TM, EOS

  11. Validation of individual and aggregate global flood hazard models for two major floods in Africa.

    Science.gov (United States)

    Trigg, M.; Bernhofen, M.; Whyman, C.

    2017-12-01

    A recent intercomparison of global flood hazard models undertaken by the Global Flood Partnership shows that there is an urgent requirement to undertake more validation of the models against flood observations. As part of the intercomparison, the aggregated model dataset resulting from the project was provided as open access data. We compare the individual and aggregated flood extent output from the six global models and test these against two major floods in the African Continent within the last decade, namely severe flooding on the Niger River in Nigeria in 2012, and on the Zambezi River in Mozambique in 2007. We test if aggregating different number and combination of models increases model fit to the observations compared with the individual model outputs. We present results that illustrate some of the challenges of comparing imperfect models with imperfect observations and also that of defining the probability of a real event in order to test standard model output probabilities. Finally, we propose a collective set of open access validation flood events, with associated observational data and descriptions that provide a standard set of tests across different climates and hydraulic conditions.

  12. Future trends in flood risk in Indonesia - A probabilistic approach

    Science.gov (United States)

    Muis, Sanne; Guneralp, Burak; Jongman, Brenden; Ward, Philip

    2014-05-01

    Indonesia is one of the 10 most populous countries in the world and is highly vulnerable to (river) flooding. Catastrophic floods occur on a regular basis; total estimated damages were US 0.8 bn in 2010 and US 3 bn in 2013. Large parts of Greater Jakarta, the capital city, are annually subject to flooding. Flood risks (i.e. the product of hazard, exposure and vulnerability) are increasing due to rapid increases in exposure, such as strong population growth and ongoing economic development. The increase in risk may also be amplified by increasing flood hazards, such as increasing flood frequency and intensity due to climate change and land subsidence. The implementation of adaptation measures, such as the construction of dykes and strategic urban planning, may counteract these increasing trends. However, despite its importance for adaptation planning, a comprehensive assessment of current and future flood risk in Indonesia is lacking. This contribution addresses this issue and aims to provide insight into how socio-economic trends and climate change projections may shape future flood risks in Indonesia. Flood risk were calculated using an adapted version of the GLOFRIS global flood risk assessment model. Using this approach, we produced probabilistic maps of flood risks (i.e. annual expected damage) at a resolution of 30"x30" (ca. 1km x 1km at the equator). To represent flood exposure, we produced probabilistic projections of urban growth in a Monte-Carlo fashion based on probability density functions of projected population and GDP values for 2030. To represent flood hazard, inundation maps were computed using the hydrological-hydraulic component of GLOFRIS. These maps show flood inundation extent and depth for several return periods and were produced for several combinations of GCMs and future socioeconomic scenarios. Finally, the implementation of different adaptation strategies was incorporated into the model to explore to what extent adaptation may be able to

  13. 44 CFR 78.12 - Eligible types of projects.

    Science.gov (United States)

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.12 Eligible types of projects. The following types of projects are eligible for.... (g) Minor physical flood mitigation projects that reduce localized flooding problems and do not...

  14. Coping with Pluvial Floods by Private Households

    Directory of Open Access Journals (Sweden)

    Viktor Rözer

    2016-07-01

    Full Text Available Pluvial floods have caused severe damage to urban areas in recent years. With a projected increase in extreme precipitation as well as an ongoing urbanization, pluvial flood damage is expected to increase in the future. Therefore, further insights, especially on the adverse consequences of pluvial floods and their mitigation, are needed. To gain more knowledge, empirical damage data from three different pluvial flood events in Germany were collected through computer-aided telephone interviews. Pluvial flood awareness as well as flood experience were found to be low before the respective flood events. The level of private precaution increased considerably after all events, but is mainly focused on measures that are easy to implement. Lower inundation depths, smaller potential losses as compared with fluvial floods, as well as the fact that pluvial flooding may occur everywhere, are expected to cause a shift in damage mitigation from precaution to emergency response. However, an effective implementation of emergency measures was constrained by a low dissemination of early warnings in the study areas. Further improvements of early warning systems including dissemination as well as a rise in pluvial flood preparedness are important to reduce future pluvial flood damage.

  15. Chapter 8: Droughts, Floods, and Wildfires

    Science.gov (United States)

    Wehner, M. F.; Arnold, J. R.; Knutson, T.; Kunkel, K. E.; LeGrande, A. N.

    2017-01-01

    Recent droughts and associated heat waves have reached record intensity in some regions of the United States; however, by geographical scale and duration, the Dust Bowl era of the 1930s remains the benchmark drought and extreme heat event in the historical record (very high confidence). While by some measures drought has decreased over much of the continental United States in association with long-term increases in precipitation, neither the precipitation increases nor inferred drought decreases have been confidently attributed to anthropogenic forcing. The human effect on recent major U.S. droughts is complicated. Little evidence is found for a human influence on observed precipitation deficits, but much evidence is found for a human influence on surface soil moisture deficits due to increased evapotranspiration caused by higher temperatures. Future decreases in surface (top 10 cm) soil moisture from anthropogenic forcing over most of the United States are likely as the climate warms under higher scenarios. Substantial reductions in western U.S. winter and spring snowpack are projected as the climate warms. Earlier spring melt and reduced snow water equivalent have been formally attributed to human-induced warming (high confidence) and will very likely be exacerbated as the climate continues to warm (very high confidence). Under higher scenarios, and assuming no change to current water resources management, chronic, long-duration hydrological drought is increasingly possible by the end of this century. Detectable changes in some classes of flood frequency have occurred in parts of the United States and are a mix of increases and decreases. Extreme precipitation, one of the controlling factors in flood statistics, is observed to have generally increased and is projected to continue to do so across the United States in a warming atmosphere. However, formal attribution approaches have not established a significant connection of increased riverine flooding to human

  16. Merging information from multi-model flood projections in a hierarchical Bayesian framework

    Science.gov (United States)

    Le Vine, Nataliya

    2016-04-01

    Multi-model ensembles are becoming widely accepted for flood frequency change analysis. The use of multiple models results in large uncertainty around estimates of flood magnitudes, due to both uncertainty in model selection and natural variability of river flow. The challenge is therefore to extract the most meaningful signal from the multi-model predictions, accounting for both model quality and uncertainties in individual model estimates. The study demonstrates the potential of a recently proposed hierarchical Bayesian approach to combine information from multiple models. The approach facilitates explicit treatment of shared multi-model discrepancy as well as the probabilistic nature of the flood estimates, by treating the available models as a sample from a hypothetical complete (but unobserved) set of models. The advantages of the approach are: 1) to insure an adequate 'baseline' conditions with which to compare future changes; 2) to reduce flood estimate uncertainty; 3) to maximize use of statistical information in circumstances where multiple weak predictions individually lack power, but collectively provide meaningful information; 4) to adjust multi-model consistency criteria when model biases are large; and 5) to explicitly consider the influence of the (model performance) stationarity assumption. Moreover, the analysis indicates that reducing shared model discrepancy is the key to further reduction of uncertainty in the flood frequency analysis. The findings are of value regarding how conclusions about changing exposure to flooding are drawn, and to flood frequency change attribution studies.

  17. Tijuana River Flood Control Project, San Diego County, California.

    Science.gov (United States)

    1976-05-20

    presence of historical and archeological resoureces in the proposed project area. His letter of August 1, 1973 (see appendix) indicated that no state... human misery among those directly affected. Those impacts will be pert of the permanent and disastrous legacy of the "Recommended Plan" (Alternative Ill...of citizens; and general human misery among those directly affected. Those impacts will be part of the permanent and disastrous legacy of the

  18. Developing a national programme of flood risk management measures: Moldova

    Directory of Open Access Journals (Sweden)

    Ramsbottom David

    2016-01-01

    Full Text Available A Technical Assistance project funded by the European Investment Bank has been undertaken to develop a programme of flood risk management measures for Moldova that will address the main shortcomings in the present flood management system, and provide the basis for long-term improvement. Areas of significant flood risk were identified using national hydraulic and flood risk modelling, and flood hazard and flood risk maps were then prepared for these high risk areas. The flood risk was calculated using 12 indicators representing social, economic and environmental impacts of flooding. Indicator values were combined to provide overall estimates of flood risk. Strategic approaches to flood risk management were identified for each river basin using a multi-criteria analysis. Measures were then identified to achieve the strategic approaches. A programme of measures covering a 20-year period was developed together with a more detailed Short-Term Investment Plan covering the first seven years of the programme. Arrangements are now being made to implement the programme. The technical achievements of the project included national hydrological and hydraulic modelling covering 12,000 km of river, the development of 2-dimensional channel and floodplain hydraulic models from a range of topographic and bathymetric data, and an integrated flood risk assessment that takes account of both economic and non-monetary impacts.

  19. Optimal investment and location decisions of a firm in a flood risk area using Impulse Control Theory

    Science.gov (United States)

    Grames, Johanna; Grass, Dieter; Kort, Peter; Prskawetz, Alexia

    2017-04-01

    Flooding events can affect businesses close to rivers, lakes or coasts. This paper provides a partial equilibrium model which helps to understand the optimal location choice for a firm in flood risk areas and its investment strategies. How often, when and how much are firms willing to invest in flood risk protection measures? We apply Impulse Control Theory to solve the model analytically and develop a continuation algorithm to solve the model numerically. Firms always invest in flood defense. The investment increases the higher the flood risk and the more firms also value the future, i.e. the more sustainable they plan. Investments in production capital follow a similar path. Hence, planning in a sustainable way leads to economic growth. Sociohydrological feedbacks are crucial for the location choice of the firm, whereas different economic situations have an impact on investment strategies. If flood defense is already present, e.g. built up by the government, firms move closer to the water and invest less in flood defense, which allows firms to accrue higher expected profits. Firms with a large initial production capital surprisingly try not to keep their market advantage, but rather reduce flood risk by reducing exposed production capital.

  20. Review Article: Structural flood-protection measures referring to several European case studies

    Science.gov (United States)

    Kryžanowski, A.; Brilly, M.; Rusjan, S.; Schnabl, S.

    2014-01-01

    The paper presents a review of structural measures that were taken to cope with floods in some cities along the Danube River, such as Vienna, Bratislava, and Belgrade. These cities were also considered as case studies within the KULTURisk project. The structural measures are reviewed and compared to each other according to the type, duration of application, the return period of the design flood event, how the project measures are integrated into spatial planning and the problems that occur in the flood defences today. Based on this review, some suggestions are given on how to improve the flood risk management in flood-prone areas.

  1. Influences of Regional Development on Land Use of Nagara Basin and Flood Risk Control

    Directory of Open Access Journals (Sweden)

    Banba Michiko

    2016-01-01

    Full Text Available Land developments, and construction of factories or logistic centers should be implemented with the wellconsidered land use plans by taking account of disaster risks to improve the resilience of region to mitigate damages. In this paper, the relationship between regional development and land use from the perspective of flood risk control. Nagara basin in Gifu prefecture (Gifu, Mino, and Seki City, where transportation network has been developed to raise the potential for more development, is selected as a case study site. First, changes of industrial structures of the region and its influences on land use were analyzed. Then, possible flood control measures were summarized, and issues from the land use perspective are analysed

  2. Flood moderation by large reservoirs in the humid tropics of Western ghat region of Kerala, India

    Energy Technology Data Exchange (ETDEWEB)

    Abe, George [Centre for Water Resources Development and Management, Sub Centre, Kottayam South P.O, Kottayam-686 039, Kerala (India); James, E.J. [Water Institute and Dean (Research), Karunya University, Coimbatore-641 114, Tamil Nadu (India)

    2013-07-01

    Kerala State located in the humid tropics receives an average rainfall of 2810 mm. On an average 85% of this rainfall is received during the two monsoons spread from June to November. Midland and lowland regions of several of the river basins of Kerala experience severe flood events during the monsoons. Idamalayar hydro-electric project (1987) in Periyar River basin envisages flood control apart from power generation. This paper analyzes the flood moderation by Idamalayar reservoir considering the storage regime (inflow and outflow) which is subjected to a strong inter annual variability. The role of Idamalayar reservoir in controlling the monsoon floods is analyzed using daily data (1987-2010). The results of analysis show that the flood moderation by the reservoir is 92% when water storage is less than 50%. The reduction is 87% when reservoir storage is between 50 to 90% and moderation reduces to 62% when the reservoir storage is above 90%. Non-parametric trend analysis of fifty years of hydrologic data shows a reducing trend in inflow and storage during south-west monsoon which reduced spill and subsequent flood events during north-east monsoon.

  3. Floods and Flash Flooding

    Science.gov (United States)

    Floods and flash flooding Now is the time to determine your area’s flood risk. If you are not sure whether you ... If you are in a floodplain, consider buying flood insurance. Do not drive around barricades. If your ...

  4. Implementation of anomaly detection algorithms for detecting transmission control protocol synchronized flooding attacks

    CSIR Research Space (South Africa)

    Mkuzangwe, NNP

    2015-08-01

    Full Text Available This work implements two anomaly detection algorithms for detecting Transmission Control Protocol Synchronized (TCP SYN) flooding attack. The two algorithms are an adaptive threshold algorithm and a cumulative sum (CUSUM) based algorithm...

  5. Study on Flood Management Plan in Surabaya City

    Directory of Open Access Journals (Sweden)

    Anton Dharma Pusaka Mas

    2015-05-01

    Full Text Available The area alongside the Gunung Sari Channel has an important meaning to the development of Surabaya City. The rising development in this area which causes the increase of flood events induces negative impacts on the growth of Surabaya City. The flood management plan in Gunung Sari Channel has been conducted by Brantas Project since 1988. This planning was reviewed in 1993 and 1999. This research was conducted to analyze the performance of flood management plan by Brantas Project. It was constructively done by HEC-FDA Software which can develop risk analysis by including economic consideration. Hydro-Economy approach integrated with the HEC-FDA analysis can yield the indicator of flood management plan performance in the form of total cost and risk cost (Expected Annual Damage/EAD. The best total cost yielded from the analysis was Rp. 893,692,230, while the risk cost was Rp. 384,238,410/year. It is expected that this research result can used for achieving best performance for floods management in Gunung Sari Channel.

  6. New mechanism under International Flood Initiative toward robustness for flood management in the Asia Pacific region

    Science.gov (United States)

    Murase, M.; Yoshitani, J.; Takeuchi, K.; Koike, T.

    2015-12-01

    Climate change is likely to result in increases in the frequency or intensity of extreme weather events. It is imperative that a good understanding is developed of how climate change affects the events that are reflected in hydrological extremes such as floods and how practitioners in water resources management deal with them. Since there is still major uncertainty as to how the impact of climate change affect actual water resources management, it is important to build robustness into management schemes and communities. Flood management under such variety of uncertainty favors the flexible and adaptive implementation both in top-down and bottom-up approaches. The former uses projections of global or spatially downscaled models to drive resource models and project resource impacts. The latter utilizes policy or planning tools to identify what changes in climate would be most threatening to their long-range operations. Especially for the bottom-up approaches, it is essential to identify the gap between what should be done and what has not been achieved for disaster risks. Indicators or index are appropriate tools to measure such gaps, but they are still in progress to cover the whole world. The International Flood Initiative (IFI), initiated in January 2005 by UNESCO and WMO in close cooperation with UNU and ISDR, IAHS and IAHR, has promoted an integrated approach to flood management to take advantage of floods and use of flood plains while reducing the social, environmental and economic risks. Its secretariat is located in ICHARM. The initiative objective is to support national platforms to practice evidence-based disaster risk reduction through mobilizing scientific and research networks at national, regional and international levels. The initiative is now preparing for a new mechanism to facilitate the integrated approach for flood management on the ground regionally in the Asia Pacific (IFI-AP) through monitoring, assessment and capacity building.

  7. Analysis of coastal protection under rising flood risk

    Directory of Open Access Journals (Sweden)

    Megan J. Lickley

    2014-01-01

    Full Text Available Infrastructure located along the U.S. Atlantic and Gulf coasts is exposed to rising risk of flooding from sea level rise, increasing storm surge, and subsidence. In these circumstances coastal management commonly based on 100-year flood maps assuming current climatology is no longer adequate. A dynamic programming cost–benefit analysis is applied to the adaptation decision, illustrated by application to an energy facility in Galveston Bay. Projections of several global climate models provide inputs to estimates of the change in hurricane and storm surge activity as well as the increase in sea level. The projected rise in physical flood risk is combined with estimates of flood damage and protection costs in an analysis of the multi-period nature of adaptation choice. The result is a planning method, using dynamic programming, which is appropriate for investment and abandonment decisions under rising coastal risk.

  8. Flood Risk Research and Warning Tools at the European Scale

    NARCIS (Netherlands)

    Roo, A.P.J. de; Thielen, J.; Feyen, L.; Burek, P.; Salamon, P.

    2012-01-01

    The floods in the rivers Meuse and Rhine in 1993 and 1995 made the European Commission realize that also at Commission level further research on floods – especially in transboundary river catchments - was necessary. This led to the start of a dedicated research project on floods at the European

  9. Namibian Flood Early Warning SensorWeb Pilot

    Science.gov (United States)

    Mandl, Daniel; Policelli, Fritz; Frye, Stuart; Cappelare, Pat; Langenhove, Guido Van; Szarzynski, Joerg; Sohlberg, Rob

    2010-01-01

    The major goal of the Namibia SensorWeb Pilot Project is a scientifically sound, operational trans-boundary flood management decision support system for Southern African region to provide useful flood and waterborne disease forecasting tools for local decision makers. The Pilot Project established under the auspices of: Namibian Ministry of Agriculture Water and Forestry (MAWF), Department of Water Affairs; Committee on Earth Observing Satellites (CEOS), Working Group on Information Systems and Services (WGISS); and moderated by the United Nations Platform for Space-based Information for Disaster Management and Emergency Response (UN-SPIDER). The effort consists of identifying and prototyping technology which enables the rapid gathering and dissemination of both space-based and ground sensor data and data products for the purpose of flood disaster management and water-borne disease management.

  10. The response of source-bordering aeolian dunefields to sediment-supply changes 2: Controlled floods of the Colorado River in Grand Canyon, Arizona, USA

    Science.gov (United States)

    Sankey, Joel B.; Caster, Joshua; Kasprak, Alan; East, Amy E.

    2018-06-01

    In the Colorado River downstream of Glen Canyon Dam in the Grand Canyon, USA, controlled floods are used to resupply sediment to, and rebuild, river sandbars that have eroded severely over the past five decades owing to dam-induced changes in river flow and sediment supply. In this study, we examine whether controlled floods, can in turn resupply aeolian sediment to some of the large source-bordering aeolian dunefields (SBDs) along the margins of the river. Using a legacy of high-resolution lidar remote-sensing and meteorological data, we characterize the response of four SBDs (a subset of 117 SBDs and other aeolian-sand-dominated areas in the canyon) during four sediment-laden controlled floods of the Colorado River in 2012, 2013, 2014, and 2016. We find that aeolian sediment resupply unambiguously occurred in 8 of the 16 instances of controlled flooding adjacent to SBDs. Resupply attributed to individual floods varied substantially among sites, and occurred with four, three, one, and zero floods at the four sites, respectively. We infer that the relative success of controlled floods as a regulated-river management tool for resupplying sediment to SBDs is analogous to the frequency of resupply observed for fluvial sandbars in this setting, in that sediment resupply was estimated to have occurred for roughly half of the instances of recent controlled flooding at sandbars monitored separately from this study. We find the methods developed in this, and a companion study, are effective tools to quantify geomorphic changes in sediment storage, along linked fluvial and aeolian pathways of sedimentary systems.

  11. The response of source-bordering aeolian dunefields to sediment-supply changes 2: Controlled floods of the Colorado River in Grand Canyon, Arizona, USA

    Science.gov (United States)

    Sankey, Joel B.; Caster, Joshua; Kasprak, Alan; East, Amy

    2018-01-01

    In the Colorado River downstream of Glen Canyon Dam in the Grand Canyon, USA, controlled floods are used to resupply sediment to, and rebuild, river sandbars that have eroded severely over the past five decades owing to dam-induced changes in river flow and sediment supply. In this study, we examine whether controlled floods, can in turn resupply aeolian sediment to some of the large source-bordering aeolian dunefields (SBDs) along the margins of the river. Using a legacy of high-resolution lidar remote-sensing and meteorological data, we characterize the response of four SBDs (a subset of 117 SBDs and other aeolian-sand-dominated areas in the canyon) during four sediment-laden controlled floods of the Colorado River in 2012, 2013, 2014, and 2016. We find that aeolian sediment resupply unambiguously occurred in 8 of the 16 instances of controlled flooding adjacent to SBDs. Resupply attributed to individual floods varied substantially among sites, and occurred with four, three, one, and zero floods at the four sites, respectively. We infer that the relative success of controlled floods as a regulated-river management tool for resupplying sediment to SBDs is analogous to the frequency of resupply observed for fluvial sandbars in this setting, in that sediment resupply was estimated to have occurred for roughly half of the instances of recent controlled flooding at sandbars monitored separately from this study. We find the methods developed in this, and a companion study, are effective tools to quantify geomorphic changes in sediment storage, along linked fluvial and aeolian pathways of sedimentary systems.

  12. Flood Mapping: Assessing the uncertainty associated with flood inundation modelling. A case study of the Mora River, Sweden

    OpenAIRE

    Åberg, Isabelle

    2017-01-01

    Expansion of cities and major infrastructure projects lead to changes in land use and river flows. The probability of flooding is expected to increase in the future as a result of these changes in combination with climate change. Hydraulic models can be used to obtain simulated water levels to investigate the risk of flooding and identify areas that might potentially be flooded due to climate change. Since a model is a simplification of the reality it is important to be aware of a model’s unc...

  13. Flood Foresight: A near-real time flood monitoring and forecasting tool for rapid and predictive flood impact assessment

    Science.gov (United States)

    Revilla-Romero, Beatriz; Shelton, Kay; Wood, Elizabeth; Berry, Robert; Bevington, John; Hankin, Barry; Lewis, Gavin; Gubbin, Andrew; Griffiths, Samuel; Barnard, Paul; Pinnell, Marc; Huyck, Charles

    2017-04-01

    -scale view of the extent and depth of possible riverine flood events several days in advance by linking forecast river flow from a hydrological model to a global flood risk map. The Monitoring component provides a similar local-scale view of a flood inundation extent but in near real time, as an event unfolds, by combining the global flood risk map with observed river gauge telemetry. Immediately following an event, the maximum extent of the flood is also generated. Users of Flood Foresight will be able to receive current and forecast flood extents and depth information via API into their own GIS or analytics software. The set of tools is currently operational for the UK and Europe; the methods presented can be applied globally, allowing provision of service to any country or region. This project was supported by InnovateUK under the Solving Business Problems with Environmental Data competition.

  14. FREQUENCY ANALYSIS OF RAINFALL FOR FLOOD CONTROL IN ...

    African Journals Online (AJOL)

    The Niger Delta Region of Nigeria is within the mangrove forest region and is crisscrossed by series of streams and creeks. As a result of the high rainfall volume within this region there is a tendency for severe flooding to occur. These flood events have severe consequences on lives and properties. It is therefore necessary ...

  15. A MOOC on control of flooding in Prague

    NARCIS (Netherlands)

    Rothkrantz, L.J.M.

    2016-01-01

    The paper is about the development of a MOOC on the flooding of the river Vltava in the Czech country. The MOOC has been designed as a serious game. Students from all over the world are invited to take part in the management team to reduce the negative impact of the flooding. The MT has to take

  16. Flood Frequency Analysis of Future Climate Projections in the Cache Creek Watershed

    Science.gov (United States)

    Fischer, I.; Trihn, T.; Ishida, K.; Jang, S.; Kavvas, E.; Kavvas, M. L.

    2014-12-01

    Effects of climate change on hydrologic flow regimes, particularly extreme events, necessitate modeling of future flows to best inform water resources management. Future flow projections may be modeled through the joint use of carbon emission scenarios, general circulation models and watershed models. This research effort ran 13 simulations for carbon emission scenarios (taken from the A1, A2 and B1 families) over the 21st century (2001-2100) for the Cache Creek watershed in Northern California. Atmospheric data from general circulation models, CCSM3 and ECHAM5, were dynamically downscaled to a 9 km resolution using MM5, a regional mesoscale model, before being input into the physically based watershed environmental hydrology (WEHY) model. Ensemble mean and standard deviation of simulated flows describe the expected hydrologic system response. Frequency histograms and cumulative distribution functions characterize the range of hydrologic responses that may occur. The modeled flow results comprise a dataset suitable for time series and frequency analysis allowing for more robust system characterization, including indices such as the 100 year flood return period. These results are significant for water quality management as the Cache Creek watershed is severely impacted by mercury pollution from historic mining activities. Extreme flow events control mercury fate and transport affecting the downstream water bodies of the Sacramento River and Sacramento- San Joaquin Delta which provide drinking water to over 25 million people.

  17. Quantification of uncertainty in flood risk assessment for flood protection planning: a Bayesian approach

    Science.gov (United States)

    Dittes, Beatrice; Špačková, Olga; Ebrahimian, Negin; Kaiser, Maria; Rieger, Wolfgang; Disse, Markus; Straub, Daniel

    2017-04-01

    Flood risk estimates are subject to significant uncertainties, e.g. due to limited records of historic flood events, uncertainty in flood modeling, uncertain impact of climate change or uncertainty in the exposure and loss estimates. In traditional design of flood protection systems, these uncertainties are typically just accounted for implicitly, based on engineering judgment. In the AdaptRisk project, we develop a fully quantitative framework for planning of flood protection systems under current and future uncertainties using quantitative pre-posterior Bayesian decision analysis. In this contribution, we focus on the quantification of the uncertainties and study their relative influence on the flood risk estimate and on the planning of flood protection systems. The following uncertainty components are included using a Bayesian approach: 1) inherent and statistical (i.e. limited record length) uncertainty; 2) climate uncertainty that can be learned from an ensemble of GCM-RCM models; 3) estimates of climate uncertainty components not covered in 2), such as bias correction, incomplete ensemble, local specifics not captured by the GCM-RCM models; 4) uncertainty in the inundation modelling; 5) uncertainty in damage estimation. We also investigate how these uncertainties are possibly reduced in the future when new evidence - such as new climate models, observed extreme events, and socio-economic data - becomes available. Finally, we look into how this new evidence influences the risk assessment and effectivity of flood protection systems. We demonstrate our methodology for a pre-alpine catchment in southern Germany: the Mangfall catchment in Bavaria that includes the city of Rosenheim, which suffered significant losses during the 2013 flood event.

  18. Field Testing of Energy-Efficient Flood-Damage-Resistant Residential Envelope Systems Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Aglan, H.

    2005-08-04

    The primary purpose of the project was to identify materials and methods that will make the envelope of a house flood damage resistant. Flood damage resistant materials and systems are intended to be used to repair houses subsequent to flooding. This project was also intended to develop methods of restoring the envelopes of houses that have been flooded but are repairable and may be subject to future flooding. Then if the house floods again, damage will not be as extensive as in previous flood events and restoration costs and efforts will be minimized. The purpose of the first pair of field tests was to establish a baseline for typical current residential construction practice. The first test modules used materials and systems that were commonly found in residential envelopes throughout the U.S. The purpose of the second pair of field tests was to begin evaluating potential residential envelope materials and systems that were projected to be more flood-damage resistant and restorable than the conventional materials and systems tested in the first pair of tests. The purpose of testing the third slab-on-grade module was to attempt to dry flood proof the module (no floodwater within the structure). If the module could be sealed well enough to prevent water from entering, then this would be an effective method of making the interior materials and systems flood damage resistant. The third crawl space module was tested in the same manner as the previous modules and provided an opportunity to do flood tests of additional residential materials and systems. Another purpose of the project was to develop the methodology to collect representative, measured, reproducible (i.e. scientific) data on how various residential materials and systems respond to flooding conditions so that future recommendations for repairing flood damaged houses could be based on scientific data. An additional benefit of collecting this data is that it will be used in the development of a standard test

  19. Modeling flood events for long-term stability

    International Nuclear Information System (INIS)

    Schruben, T.; Portillo, R.

    1985-01-01

    The primary objective for the disposal of uranium mill tailings in the Uranium Mill Tailings Remedial Action (UMTRA) Project is isolation and stabilization to prevent their misuse by man and dispersal by natural forces such as wind, rain, and flood waters (40 CFR-192). Stabilization of sites that are located in or near flood plains presents unique problems in design for long-term performance. This paper discusses the process involved with the selection and hydrologic modeling of the design flood event; and hydraulic modeling with geomorphic considerations of the design flood event. The Gunnison, Colorado, and Riverton, Wyoming, sites will be used as examples in describing the process

  20. Estimates of Present and Future Flood Risk in the Conterminous United States

    Science.gov (United States)

    Wing, O.; Bates, P. D.; Smith, A.; Sampson, C. C.; Johnson, K.; Fargione, J.; Morefield, P.

    2017-12-01

    Past attempts to estimate flood risk across the USA either have incomplete coverage, coarse resolution or use overly simplified models of the flooding process. In this paper, we use a new 30m resolution model of the entire conterminous US (CONUS) with realistic flood physics to produce estimates of flood hazard which match to within 90% accuracy the skill of local models built with detailed data. Socio-economic data of commensurate resolution are combined with these flood depths to estimate current and future flood risk. Future population and land-use projections from the US Environmental Protection Agency (USEPA) are employed to indicate how flood risk might change through the 21st Century, while present-day estimates utilize the Federal Emergency Management Agency (FEMA) National Structure Inventory and a USEPA map of population distribution. Our data show that the total CONUS population currently exposed to serious flooding is 2.6 to 3.1 times higher than previous estimates; with nearly 41 million Americans living within the so-called 1 in 100-year (1% annual probability) floodplain, compared to only 13 million according to FEMA flood maps. Moreover, socio-economic change alone leads to significant future increases in flood exposure and risk, even before climate change impacts are accounted for. The share of the population living on the 1 in 100-year floodplain is projected to increase from 13.3% in the present-day to 15.6 - 15.8% in 2050 and 16.4 - 16.8% in 2100. The area of developed land within this floodplain, currently at 150,000 km2, is likely to increase by 37 - 72% in 2100 based on the scenarios selected. 5.5 trillion worth of assets currently lie on the 1% floodplain; we project that by 2100 this number will exceed 10 trillion. With this detailed spatial information on present-day flood risk, federal and state agencies can take appropriate action to mitigate losses. Use of USEPA population and land-use projections mean that particular attention can be

  1. Flood Resilient Systems and their Application for Flood Resilient Planning

    Science.gov (United States)

    Manojlovic, N.; Gabalda, V.; Antanaskovic, D.; Gershovich, I.; Pasche, E.

    2012-04-01

    Following the paradigm shift in flood management from traditional to more integrated approaches, and considering the uncertainties of future development due to drivers such as climate change, one of the main emerging tasks of flood managers becomes the development of (flood) resilient cities. It can be achieved by application of non-structural - flood resilience measures, summarised in the 4As: assistance, alleviation, awareness and avoidance (FIAC, 2007). As a part of this strategy, the key aspect of development of resilient cities - resilient built environment can be reached by efficient application of Flood Resilience Technology (FReT) and its meaningful combination into flood resilient systems (FRS). FRS are given as [an interconnecting network of FReT which facilitates resilience (including both restorative and adaptive capacity) to flooding, addressing physical and social systems and considering different flood typologies] (SMARTeST, http://www.floodresilience.eu/). Applying the system approach (e.g. Zevenbergen, 2008), FRS can be developed at different scales from the building to the city level. Still, a matter of research is a method to define and systematise different FRS crossing those scales. Further, the decision on which resilient system is to be applied for the given conditions and given scale is a complex task, calling for utilisation of decision support tools. This process of decision-making should follow the steps of flood risk assessment (1) and development of a flood resilience plan (2) (Manojlovic et al, 2009). The key problem in (2) is how to match the input parameters that describe physical&social system and flood typology to the appropriate flood resilient system. Additionally, an open issue is how to integrate the advances in FReT and findings on its efficiency into decision support tools. This paper presents a way to define, systematise and make decisions on FRS at different scales of an urban system developed within the 7th FP Project

  2. Wynoochee Lake and dam flood storage reevaluation study

    International Nuclear Information System (INIS)

    Lynch, C.J.

    1993-01-01

    With the desire to increase the revenue generating potential of the Wynoochee Lake and Dam Project the cities of Tacoma and Aberdeen, Washington, have pursued the potential for retrofitting a hydropower plant at the dam. The feasibility of the hydropower plant is dependent on higher average head for power generation. This paper discusses the Corps of Engineers reevaluation of the winter flood control requirements with the aim of raising the elevation of the winter operating pool

  3. Commonalities and Differences in Flood-Generating Processes across the US

    Science.gov (United States)

    Li, X.; Troy, T. J.

    2017-12-01

    There is significant damage caused by flood, and the flood risk is increasing in the future, but there is large uncertainty in future decadal projections of flooding. In order to improve these projections, we must first turn to the past to understand the physical mechanisms that lead to flooding in basins across spatial scales and elevation ranges. To do this, we calculated the seasonality of annual maximum flows and other climatic factors to identify the flood-generating process in 2566 basins across the continental US. For most regions, the seasonality of heavy precipitation is not in phase with the seasonality of flooding, pointing to the importance of antecedent soil moisture and snow in determining flooding over much of the US. To determine the characteristic conditions leading to a flood, we classified all floods into those with different rainfall durations and with/without snow presence. Analyzing the influence of elevation, slope and drainage area, we identified patterns: the probability of flooding due to long duration precipitation increases as drainage area increases and snow present during a flood becomes increasingly likely as average basin elevation increases. To better understand the relationship between heavy rainfall and high streamflow, we calculated conditioned probability of occurrence. The southeastern US has a higher probability of occurrence for extreme Q with the same level of extreme precipitation in winter and spring than the northern US. This work is the first to look at how flood mechanisms vary across the continental US with drainage area, climate, and elevation.

  4. Adaptation to floods in future climate: a practical approach

    Science.gov (United States)

    Doroszkiewicz, Joanna; Romanowicz, Renata; Radon, Radoslaw; Hisdal, Hege

    2016-04-01

    In this study some aspects of the application of the 1D hydraulic model are discussed with a focus on its suitability for flood adaptation under future climate conditions. The Biała Tarnowska catchment is used as a case study. A 1D hydraulic model is developed for the evaluation of inundation extent and risk maps in future climatic conditions. We analyse the following flood indices: (i) extent of inundation area; (ii) depth of water on flooded land; (iii) the flood wave duration; (iv) the volume of a flood wave over the threshold value. In this study we derive a model cross-section geometry following the results of primary research based on a 500-year flood inundation extent. We compare two methods of localisation of cross-sections from the point of view of their suitability to the derivation of the most precise inundation outlines. The aim is to specify embankment heights along the river channel that would protect the river valley in the most vulnerable locations under future climatic conditions. We present an experimental design for scenario analysis studies and uncertainty reduction options for future climate projections obtained from the EUROCORDEX project. Acknowledgements: This work was supported by the project CHIHE (Climate Change Impact on Hydrological Extremes), carried out in the Institute of Geophysics Polish Academy of Sciences, funded by Norway Grants (contract No. Pol-Nor/196243/80/2013). The hydro-meteorological observations were provided by the Institute of Meteorology and Water Management (IMGW), Poland.

  5. Urban sprawl and flooding in southern California

    Science.gov (United States)

    Rantz, S.E.

    1970-01-01

    The floods of January 1969 in south-coastal California provide a timely example of the effect of urban sprawl on flood damage. Despite recordbreaking, or near recordbreaking, stream discharges, damage was minimal in the older developed areas that are protected against inundation and debris damage by carefully planned flood-control facilities, including debris basins and flood-conveyance channels. By contrast, heavy damage occurred in areas of more recent urban sprawl, where the hazards of inundation and debris or landslide damage have not been taken into consideration, and where the improvement and development of drainage or flood-control facilities have not kept pace with expanding urbanization.

  6. Model simulations of potential contribution of the proposed Huangpu Gate to flood control in the Lake Taihu basin of China

    Science.gov (United States)

    Zhang, Hanghui; Liu, Shuguang; Ye, Jianchun; Yeh, Pat J.-F.

    2017-10-01

    The Lake Taihu basin (36 895 km2), one of the most developed regions in China located in the hinterland of the Yangtze River Delta, has experienced increasing flood risk. The largest flood in history occurred in 1999 with a return period estimate of 200 years, considerably larger than the current capacity of the flood defense with a design return period of 50 years. Due to its flat saucer-like terrain, the capacity of the flood control system in this basin depends on flood control infrastructures and peripheral tidal conditions. The Huangpu River, an important river of the basin connecting Lake Taihu upstream and Yangtze River estuaries downstream, drains two-fifths of the entire basin. Since the water level in the Huangpu River is significantly affected by the high tide conditions in estuaries, constructing an estuary gate is considered an effective solution for flood mitigation. The main objective of this paper is to assess the potential contributions of the proposed Huangpu Gate to the flood control capacity of the basin. To achieve this goal, five different scenarios of flooding conditions and the associated gate operations are considered by using numerical model simulations. Results of quantitative analyses show that the Huangpu Gate is effective for evacuating floodwaters. It can help to reduce both peak values and duration of high water levels in Lake Taihu to benefit surrounding areas along the Taipu Canal and the Huangpu River. The contribution of the gate to the flood control capacity is closely associated with its operation modes and duration. For the maximum potential contribution of the gate, the net outflow at the proposed site is increased by 52 %. The daily peak level is decreased by a maximum of 0.12 m in Lake Taihu, by maxima of 0.26-0.37 and 0.46-0.60 m in the Taipu Canal and the Huangpu River, respectively, and by 0.05-0.39 m in the surrounding areas depending on the local topography. It is concluded that the proposed Huangpu Gate can reduce

  7. Critical success factors in infrastructure projects

    Science.gov (United States)

    Zakaria, Siti Fairus; Zin, Rosli Mohamad; Mohamad, Ismail; Balubaid, Saeed; Mydin, Shaik Hussein; Mohd Rahim, E. M. Roodienyanto

    2017-11-01

    Construction of infrastructure project is different from buildings. The main difference is term of project site where infrastructure project need to command a long stretch while building mostly confine to a limited area. As such factors that are critical to infrastructure project may not be that significant to building project and vice versa. Flood mitigation can be classified under infrastructure projects under which their developments are planned by the government with the specific objective to reduce or avoid the negative effects of flood to the environment and livelihood. One of the indicators in project success is delay. The impact of project delay in construction industry is significant that it decelerates the projects implementation, specifically the government projects. This study attempted to identify and compare the success factors between infrastructure and building projects, as such comparison rarely found in the current literature. A model of flood mitigation projects' success factors was developed by merging the experts' views and reports from the existing literature. The experts' views were obtained from the responses to open-ended questions on the required fundamentals to achieve successful completion of flood mitigation projects. An affinity analysis was applied to these responses to develop the model. The developed model was then compared to the established success factors found in building project, extracted from the previous studies to identify the similarities and differences between the two models. This study would assist the government and construction players to become more effective in constructing successful flood mitigation projects for the future practice in a flood-prone country like Malaysia.

  8. Flood damage to historic buildings and structures

    Czech Academy of Sciences Publication Activity Database

    Drdácký, Miloš

    2010-01-01

    Roč. 24, č. 5 (2010), s. 439-445 ISSN 0887-3828 Grant - others:evropská komise(XE) FP6 Project cultural heritage protection against flood CHEF-SSPI-044251 Institutional research plan: CEZ:AV0Z20710524 Keywords : flood impact * historic structures * damage category Subject RIV: AL - Art, Architecture, Cultural Heritage Impact factor: 0.293, year: 2010

  9. Flash floods warning technique based on wireless communication networks data

    Science.gov (United States)

    David, Noam; Alpert, Pinhas; Messer, Hagit

    2010-05-01

    Flash floods can occur throughout or subsequent to rainfall events, particularly in cases where the precipitation is of high-intensity. Unfortunately, each year these floods cause severe property damage and heavy casualties. At present, there are no sufficient real time flash flood warning facilities found to cope with this phenomenon. Here we show the tremendous potential of flash floods advanced warning based on precipitation measurements of commercial microwave links. As was recently shown, wireless communication networks supply high resolution precipitation measurements at ground level while often being situated in flood prone areas, covering large parts of these hazardous regions. We present the flash flood warning potential of the wireless communication system for two different cases when floods occurred at the Judean desert and at the northern Negev in Israel. In both cases, an advanced warning regarding the hazard could have been announced based on this system. • This research was supported by THE ISRAEL SCIENCE FOUNDATION (grant No. 173/08). This work was also supported by a grant from the Yeshaya Horowitz Association, Jerusalem. Additional support was given by the PROCEMA-BMBF project and by the GLOWA-JR BMBF project.

  10. Statistical Techniques for Project Control

    CERN Document Server

    Badiru, Adedeji B

    2012-01-01

    A project can be simple or complex. In each case, proven project management processes must be followed. In all cases of project management implementation, control must be exercised in order to assure that project objectives are achieved. Statistical Techniques for Project Control seamlessly integrates qualitative and quantitative tools and techniques for project control. It fills the void that exists in the application of statistical techniques to project control. The book begins by defining the fundamentals of project management then explores how to temper quantitative analysis with qualitati

  11. Collaborative modelling for active involvement of stakeholders in urban flood risk management

    Directory of Open Access Journals (Sweden)

    M. Evers

    2012-09-01

    Full Text Available This paper presents an approach to enhance the role of local stakeholders in dealing with urban floods. The concept is based on the DIANE-CM project (Decentralised Integrated Analysis and Enhancement of Awareness through Collaborative Modelling and Management of Flood Risk of the 2nd ERANET CRUE funding initiative. The main objective of the project was to develop and test an advanced methodology for enhancing the resilience of local communities to flooding. Through collaborative modelling, a social learning process was initiated that enhances the social capacity of the stakeholders due to the interaction process. The other aim of the project was to better understand how data from hazard and vulnerability analyses and improved maps, as well as from the near real-time flood prediction, can be used to initiate a public dialogue (i.e. collaborative mapping and planning activities in order to carry out more informed and shared decision-making processes and to enhance flood risk awareness. The concept of collaborative modelling was applied in two case studies: (1 the Cranbrook catchment in the UK, with focus on pluvial flooding; and (2 the Alster catchment in Germany, with focus on fluvial flooding. As a result of the interactive and social learning process, supported by sociotechnical instruments, an understanding of flood risk was developed amongst the stakeholders and alternatives for flood risk management for the respective case study area were jointly developed and ranked as a basis for further planning and management.

  12. 46 CFR 62.35-10 - Flooding safety.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Flooding safety. 62.35-10 Section 62.35-10 Shipping... Requirements for Specific Types of Automated Vital Systems § 62.35-10 Flooding safety. (a) Automatic bilge.... (b) Remote controls for flooding safety equipment must remain functional under flooding conditions to...

  13. Sex-specific responses to winter flooding, spring waterlogging and post-flooding recovery in Populus deltoides.

    Science.gov (United States)

    Miao, Ling-Feng; Yang, Fan; Han, Chun-Yu; Pu, Yu-Jin; Ding, Yang; Zhang, Li-Jia

    2017-05-31

    Winter flooding events are common in some rivers and streams due to dam constructions, and flooding and waterlogging inhibit the growth of trees in riparian zones. This study investigated sex-specific morphological, physiological and ultrastructural responses to various durations of winter flooding and spring waterlogging stresses, and post-flooding recovery characteristics in Populus deltoides. There were no significant differences in the morphological, ultrastructural and the majority of physiological traits in trees subjected to medium and severe winter flooding stresses, suggesting that males and females of P. deltoides were winter flooding tolerant, and insensitive to winter flooding duration. Males were more tolerant to winter flooding stress in terms of photosynthesis and chlorophyll fluorescence than females. Females displayed greater oxidative damage due to flooding stress than males. Males developed more efficient antioxidant enzymatic systems to control reactive oxygen species. Both sexes had similarly strong post-flooding recovery capabilities in terms of plant growth, and physiological and ultrastructural parameters. However, Males had better recovery capabilities in terms of pigment content. These results increase the understanding of poplars's adaptation to winter flooding stress. They also elucidate sex-specific differences in response to flooding stress during the dormant season, and during post-flooding recovery periods.

  14. Urban flooding and Resilience: concepts and needs

    Science.gov (United States)

    Gourbesville, Ph.

    2012-04-01

    During the recent years, a growing interest for resilience has been expressed in the natural disaster mitigation area and especially in the flood related events. The European Union, under the Seventh Framework Programme (FP7), has initiated several research initiatives in order to explore this concept especially for the urban environments. Under urban resilience is underlined the ability of system potentially exposed to hazard to resist, respond, recover and reflect up to stage which is enough to preserve level of functioning and structure. Urban system can be resilient to lot of different hazards. Urban resilience is defined as the degree to which cities are able to tolerate some disturbance before reorganizing around a new set of structures and processes (Holling 1973, De Bruijn 2005). The United Nation's International strategy for Disaster Reductions has defined resilience as "the capacity of a system, community or society potentially exposed to hazards to adapt, by resisting or changing in order to reach and maintain an acceptable level of functioning and structure. This is determined by the degree to which the social system is capable of organizing itself to increase this capacity for learning from past disasters for better future protection and to improve risk reduction measures."(UN/ISDR 2004). According to that, system should be able to accept the hazard and be able to recover up to condition that provides acceptable operational level of city structure and population during and after hazard event. Main elements of urban system are built environment and population. Physical characteristic of built environment and social characteristic of population have to be examined in order to evaluate resilience. Therefore presenting methodology for assessing flood resilience in urban areas has to be one of the focal points for the exposed cities. Strategies under flood management planning related to resilience of urban systems are usually regarding controlling runoff

  15. Combining Satellite Measurements and Numerical Flood Prediction Models to Save Lives and Property from Flooding

    Science.gov (United States)

    Saleh, F.; Garambois, P. A.; Biancamaria, S.

    2017-12-01

    Floods are considered the major natural threats to human societies across all continents. Consequences of floods in highly populated areas are more dramatic with losses of human lives and substantial property damage. This risk is projected to increase with the effects of climate change, particularly sea-level rise, increasing storm frequencies and intensities and increasing population and economic assets in such urban watersheds. Despite the advances in computational resources and modeling techniques, significant gaps exist in predicting complex processes and accurately representing the initial state of the system. Improving flood prediction models and data assimilation chains through satellite has become an absolute priority to produce accurate flood forecasts with sufficient lead times. The overarching goal of this work is to assess the benefits of the Surface Water Ocean Topography SWOT satellite data from a flood prediction perspective. The near real time methodology is based on combining satellite data from a simulator that mimics the future SWOT data, numerical models, high resolution elevation data and real-time local measurement in the New York/New Jersey area.

  16. On the flood forecasting at the Bulgarian part of Struma River Basin

    International Nuclear Information System (INIS)

    Dimitrov, Dobri

    2004-01-01

    Struma is a mountain river flowing from North to South, from Bulgaria through Greece up to the Aegean Sea. It generates flush floods of snow melt - rainfall type mainly in the late spring. Flood forecasting there is needed to improve the flood mitigation measures at the Bulgarian territory of the basin as well as for effective reservoir management downstream Bulgarian border, secure flood handling at Greek territory and generally decrease the flood hazard. The paper summarizes the range of activities in the basin including: - the installation of automatic telemetric hydro meteorological observation network; - review of the results of relevant past projects; - analysis of historical hydro meteorological data; - design and calibration of flood forecasting models; - demonstrating the possibility to issue flood warnings with certain lead time and accuracy; - recent efforts to increase the lead time of the hydrological forecasts, applying forecasts from High Resolution Limited Area meteorological models and other activities in the frame of the EC 5th FP EFFS project.(Author)

  17. Early physiological flood tolerance is followed by slow post-flooding root recovery in the dryland riparian tree Eucalyptus camaldulensis subsp. refulgens.

    Science.gov (United States)

    Argus, R E; Colmer, T D; Grierson, P F

    2015-06-01

    We investigated physiological and morphological responses to flooding and recovery in Eucalyptus camaldulensis subsp. refulgens, a riparian tree species from a dryland region prone to intense episodic floods. Seedlings in soil flooded for 88 d produced extensive adventitious roots, displayed stem hypertrophy (stem diameter increased by 93%) and increased root porosity owing to aerenchyma formation. Net photosynthesis (Pn) and stomatal conductance (gs) were maintained for at least 2 weeks of soil flooding, contrasting with previous studies of other subspecies of E. camaldulensis. Gradual declines followed in both gs (30% less than controls) and Pn (19% less). Total leaf soluble sugars did not differ between flooded and control plants. Root mass did not recover 32 d after flooding ceased, but gs was not lower than controls, suggesting the root system was able to functionally compensate. However, the limited root growth during recovery after flooding was surprising given the importance of extensive root systems in dryland environments. We conclude that early flood tolerance could be an adaptation to capitalize on scarce water resources in a water-limited environment. Overall, our findings highlight the need to assess flooding responses in relation to a species' fitness for particular flood regimes or ecological niches. © 2014 John Wiley & Sons Ltd.

  18. Climatic control of Mississippi River flood hazard amplified by river engineering

    Science.gov (United States)

    Munoz, Samuel E.; Giosan, Liviu; Therrell, Matthew D.; Remo, Jonathan W. F.; Shen, Zhixiong; Sullivan, Richard M.; Wiman, Charlotte; O’Donnell, Michelle; Donnelly, Jeffrey P.

    2018-04-01

    Over the past century, many of the world’s major rivers have been modified for the purposes of flood mitigation, power generation and commercial navigation. Engineering modifications to the Mississippi River system have altered the river’s sediment levels and channel morphology, but the influence of these modifications on flood hazard is debated. Detecting and attributing changes in river discharge is challenging because instrumental streamflow records are often too short to evaluate the range of natural hydrological variability before the establishment of flood mitigation infrastructure. Here we show that multi-decadal trends of flood hazard on the lower Mississippi River are strongly modulated by dynamical modes of climate variability, particularly the El Niño–Southern Oscillation and the Atlantic Multidecadal Oscillation, but that the artificial channelization (confinement to a straightened channel) has greatly amplified flood magnitudes over the past century. Our results, based on a multi-proxy reconstruction of flood frequency and magnitude spanning the past 500 years, reveal that the magnitude of the 100-year flood (a flood with a 1 per cent chance of being exceeded in any year) has increased by 20 per cent over those five centuries, with about 75 per cent of this increase attributed to river engineering. We conclude that the interaction of human alterations to the Mississippi River system with dynamical modes of climate variability has elevated the current flood hazard to levels that are unprecedented within the past five centuries.

  19. A dam against the Yangtse floods; Ein Bollwerk gegen die Fluten des Jangtse

    Energy Technology Data Exchange (ETDEWEB)

    Sauer, H.D.

    1998-02-01

    China`s history has always been landmarked by fights against flooded rivers. Ever since the earliest dynasties, China`s leaders have attempted to control the devastating effects of floods. The new government carries out an unequalled programme of dam construction to control the forces of nature. The most gigantic of these is the ``Three Canyons Project`` on the Yangtse river. (orig.) [Deutsch] Chinas Geschichte ist gepraegt vom Kampf mit dem Wasser. Seit den fruehesten Dynastien haben die Herrscher im Reich der Mitte versucht, den verheerenden Ueberschwemmungen Einhalt zu gebieten. Mit einem weltweit beispiellosen Programm von Dammbauten versucht die Regierung nun, gegen die Naturgewalten die Oberhand zu gewinnen. Ein Vorhaben stellt dabei alle anderen in den Schatten: Das `Drei-Schluchten-Projekt` am Jangtse. (orig.)

  20. Columbia River System Operation Review final environmental impact statement. Appendix E: Flood control

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The Corps of Engineers, Bonneville Power Administration, and Bureau of Reclamation conducted a scoping process consisting of a series of regionwide public meetings and solicitation of written comments in the summer of 1990. Comments on flood control issues were received from all parts of the Columbia river basin. This appendix includes issues raised in the public scoping process, as well as those brought for consideration by members of the Flood Control Work Group

  1. EMERGO : The Dutch flood risk system since 1986

    NARCIS (Netherlands)

    Rijcken, T.

    2017-01-01

    PART I | A RESEARCH AND DESIGN PROJECT ABOUT FLOOD RISK POLICY SINCE 1986 The period between the Dutch flood disaster of 1953 and the year 2016 can be divided into two eras, separated by the year 1986, when the famous Eastern Scheldt barrier was completed. The perspective of water professionals on

  2. Cincinnati, Ohio: Two environmental projects in danger of being misunderstood

    International Nuclear Information System (INIS)

    DeJong, K.A.

    1992-01-01

    The Mill Creek Flood Control and the Fernald Decontamination projects are major environmental issues in the (sub)urban setting of Cincinnati. Flood control of the Mill Creek, a tributary of the Ohio River that bisects Cincinnati, was initiated after a flood with $3 million damage in 1959. Its costs were originally estimated at $42 million (1970) and later at $106 million (1976); $110 million has now been spent and the total cost may reach $313 million in the year 2000 (1992 dollars). Benefit/cost ratios ranging between 2.6:1 and 1.6:1 were used to rationalize this project. Flood frequency of the Mill Creek will be discussed. Decontamination of the suburban Fernald site follows manufacturing of nuclear materials from 1953 until 1989. 149 tons of uranium and thorium wastes were released in the air, 83.5 tons to the Greater Miami River and 5,975 tons were placed in pits, all of which are leaking. The cost to cleanup up the local contamination may exceed $10 billion over a time period of 20--30 years, and the calculation of benefit/cost ratios is complex. The hydrology of the Fernald site will be examined. These two environmental projects are run respectively by the Army Corps of Engineers and the US Department of Energy through large industrial contractors. The projects are in danger of becoming like projects of the ''Military-Industrial Complex'' because of the public's ignorance or misinterpretation of the facts; the argument of public safety, and the huge costs. The role of geologists should include edification of the public about the geological aspects of environmental projects

  3. Interactive Web-based Floodplain Simulation System for Realistic Experiments of Flooding and Flood Damage

    Science.gov (United States)

    Demir, I.

    2013-12-01

    Recent developments in web technologies make it easy to manage and visualize large data sets with general public. Novel visualization techniques and dynamic user interfaces allow users to create realistic environments, and interact with data to gain insight from simulations and environmental observations. The floodplain simulation system is a web-based 3D interactive flood simulation environment to create real world flooding scenarios. The simulation systems provides a visually striking platform with realistic terrain information, and water simulation. Students can create and modify predefined scenarios, control environmental parameters, and evaluate flood mitigation techniques. The web-based simulation system provides an environment to children and adults learn about the flooding, flood damage, and effects of development and human activity in the floodplain. The system provides various scenarios customized to fit the age and education level of the users. This presentation provides an overview of the web-based flood simulation system, and demonstrates the capabilities of the system for various flooding and land use scenarios.

  4. Scoping of flood hazard mapping needs for Cumberland County, Maine

    Science.gov (United States)

    Dudley, Robert W.; Schalk, Charles W.

    2006-01-01

    watersheds, and the characteristics of the watersheds have changed with time. Therefore, many of the older studies may not depict current conditions nor accurately estimate risk in terms of flood heights. The following is the scope of work as defined in the FEMA/USGS Statement of Work: Task 1: Collect data from a variety of sources including community surveys, other Federal and State Agencies, National Flood Insurance Program (NFIP) State Coordinators, Community Assistance Visits (CAVs) and FEMA archives. Lists of mapping needs will be obtained from the MNUSS database, community surveys, and CAVs, if available. FEMA archives will be inventoried for effective FIRM panels, FIS reports, and other flood-hazard data or existing study data. Best available base map information, topographic data, flood-hazard data, and hydrologic and hydraulic data will be identified. Data from the Maine Floodplain Management Program database also will be utilized. Task 2: Contact communities in Cumberland County to notify them that FEMA and the State have selected them for a map update, and that a project scope will be developed with their input. Topics to be reviewed with the communities include (1) Purpose of the Flood Map Project (for example, the update needs that have prompted the map update); (2) The community's mapping needs; (3) The community's available mapping, hydrologic, hydraulic, and flooding information; (4) target schedule for completing the project; and (5) The community's engineering, planning, and geographic information system (GIS) capabilities. On the basis of the collected information from Task 1 and community contacts/meetings in Task 2, the USGS will develop a Draft Project Scope for the identified mapping needs of the communities in Cumberland County. The following items will be addressed in the Draft Project Scope: review of available information, determine if and how effective FIS data can be used in new project, and identify other data needed to

  5. Impact of climate change on New York City's coastal flood hazard: Increasing flood heights from the preindustrial to 2300 CE.

    Science.gov (United States)

    Garner, Andra J; Mann, Michael E; Emanuel, Kerry A; Kopp, Robert E; Lin, Ning; Alley, Richard B; Horton, Benjamin P; DeConto, Robert M; Donnelly, Jeffrey P; Pollard, David

    2017-11-07

    The flood hazard in New York City depends on both storm surges and rising sea levels. We combine modeled storm surges with probabilistic sea-level rise projections to assess future coastal inundation in New York City from the preindustrial era through 2300 CE. The storm surges are derived from large sets of synthetic tropical cyclones, downscaled from RCP8.5 simulations from three CMIP5 models. The sea-level rise projections account for potential partial collapse of the Antarctic ice sheet in assessing future coastal inundation. CMIP5 models indicate that there will be minimal change in storm-surge heights from 2010 to 2100 or 2300, because the predicted strengthening of the strongest storms will be compensated by storm tracks moving offshore at the latitude of New York City. However, projected sea-level rise causes overall flood heights associated with tropical cyclones in New York City in coming centuries to increase greatly compared with preindustrial or modern flood heights. For the various sea-level rise scenarios we consider, the 1-in-500-y flood event increases from 3.4 m above mean tidal level during 1970-2005 to 4.0-5.1 m above mean tidal level by 2080-2100 and ranges from 5.0-15.4 m above mean tidal level by 2280-2300. Further, we find that the return period of a 2.25-m flood has decreased from ∼500 y before 1800 to ∼25 y during 1970-2005 and further decreases to ∼5 y by 2030-2045 in 95% of our simulations. The 2.25-m flood height is permanently exceeded by 2280-2300 for scenarios that include Antarctica's potential partial collapse. Copyright © 2017 the Author(s). Published by PNAS.

  6. Improving flood risk mapping in Italy: the FloodRisk open-source software

    Science.gov (United States)

    Albano, Raffaele; Mancusi, Leonardo; Craciun, Iulia; Sole, Aurelia; Ozunu, Alexandru

    2017-04-01

    Time and again, floods around the world illustrate the devastating impact they can have on societies. Furthermore, the expectation that the flood damages can increase over time with climate, land-use change and social growth in flood prone-areas has raised the public and other stakeholders' (governments, international organization, re-insurance companies and emergency responders) awareness for the need to manage risks in order to mitigate their causes and consequences. In this light, the choice of appropriate measures, the assessment of the costs and effects of such measures, and their prioritization are crucial for decision makers. As a result, a priori flood risk assessment has become a key part of flood management practices with the aim of minimizing the total costs related to the risk management cycle. In this context, The EU Flood Directive 2007/60 requires the delineation of flood risk maps on the bases of most appropriate and advanced tools, with particular attention on limiting required economic efforts. The main aim of these risk maps is to provide the required knowledge for the development of flood risk management plans (FRMPs) by considering both costs and benefits of alternatives and results from consultation with all interested parties. In this context, this research project developed a free and open-source (FOSS) GIS software, called FloodRisk, to operatively support stakeholders in their compliance with the FRMPs. FloodRisk aims to facilitate the development of risk maps and the evaluation and management of current and future flood risk for multi-purpose applications. This new approach overcomes the limits of the expert-drive qualitative (EDQ) approach currently adopted in several European countries, such as Italy, which does not permit a suitable evaluation of the effectiveness of risk mitigation strategies, because the vulnerability component cannot be properly assessed. Moreover, FloodRisk is also able to involve the citizens in the flood

  7. Climate Change Adaptation Decision Making for Glacial Lake Outburst Floods From Palcacocha Lake in Peru

    Science.gov (United States)

    Cuellar, A. D.; McKinney, D. C.

    2014-12-01

    Climate change has accelerated glacial retreat in high altitude glaciated regions of Peru leading to the growth and formation of glacier lakes. Glacial lake outburst floods (GLOF) are sudden events triggered by an earthquake, avalanche into the lake or other shock that causes a sudden outflow of water. These floods are catastrophic because of their sudden onset, the difficulty predicting them, and enormous quantity of water and debris rapidly flooding downstream areas. Palcacocha Lake in the Peruvian Andes has experienced accelerated growth since it burst in 1941 and threatens the major city of Huaraz and surrounding communities. Since the 1941 flood stakeholders have advocated for projects to adapt to the increasing threat posed by Palcacocha Lake. Nonetheless, discussions surrounding projects for Palcacocha have not included a rigorous analysis of the potential consequences of a flood, probability of an event, or costs of mitigation projects. This work presents the first step to rationally analyze the risks posed by Palcacocha Lake and the various adaptation projects proposed. In this work the authors use decision analysis to asses proposed adaptation measures that would mitigate damage in downstream communities from a GLOF. We use an existing hydrodynamic model of the at-risk area to determine how adaptation projects will affect downstream flooding. Flood characteristics are used in the HEC-FIA software to estimate fatalities and injuries from an outburst flood, which we convert to monetary units using the value of a statistical life. We combine the monetary consequences of a GLOF with the cost of the proposed projects and a diffuse probability distribution for the likelihood of an event to estimate the expected cost of the adaptation plans. From this analysis we found that lowering the lake level by 15 meters has the least expected cost of any proposal despite uncertainty in the effect of lake lowering on flooding downstream.

  8. FEH Local: Improving flood estimates using historical data

    Directory of Open Access Journals (Sweden)

    Prosdocimi Ilaria

    2016-01-01

    Full Text Available The traditional approach to design flood estimation (for example, to derive the 100-year flood is to apply a statistical model to time series of peak river flow measured by gauging stations. Such records are typically not very long, for example in the UK only about 10% of the stations have records that are more than 50 years in length. Along-explored way to augment the data available from a gauging station is to derive information about historical flood events and paleo-floods, which can be obtained from careful exploration of archives, old newspapers, flood marks or other signs of past flooding that are still discernible in the catchment, and the history of settlements. The inclusion of historical data in flood frequency estimation has been shown to substantially reduce the uncertainty around the estimated design events and is likely to provide insight into the rarest events which might have pre-dated the relatively short systematic records. Among other things, the FEH Local project funded by the Environment Agency aims to develop methods to easily incorporate historical information into the standard method of statistical flood frequency estimation in the UK. Different statistical estimation procedures are explored, namely maximum likelihood and partial probability weighted moments, and the strengths and weaknesses of each method are investigated. The project assesses the usefulness of historical data and aims to provide practitioners with useful guidelines to indicate in what circumstances the inclusion of historical data is likely to be beneficial in terms of reducing both the bias and the variability of the estimated flood frequency curves. The guidelines are based on the results of a large Monte Carlo simulation study, in which different estimation procedures and different data availability scenarios are studied. The study provides some indication of the situations under which different estimation procedures might give a better performance.

  9. Post Waterflood CO2 Miscible Flood in Light Oil, Fluvial-Dominated Deltaic Reservoir (Pre-Work and Project Proposal - Appendix)

    Energy Technology Data Exchange (ETDEWEB)

    Bou-Mikael, Sami

    2002-02-05

    The main objective of the Port Neches Project was to determine the feasibility and producibility of CO2 miscible flooding techniques enhanced with horizontal drilling applied to a Fluvial Dominated Deltaic reservoir. The second was to disseminate the knowledge gained through established Technology Transfer mechanisms to support DOE's programmatic objectives of increasing domestic oil production and reducing abandonment of oil fields.

  10. Geochemical characterisation of Elbe river high flood sediments

    Energy Technology Data Exchange (ETDEWEB)

    Krueger, F. [UFZ - Umweltforschungszentrum Leipzig-Halle GmbH, Falkenberg (Germany). Sektion Boden-/Gewaesserforschung]|[UFZ - Umweltforschungszentrum Leipzig-Halle GmbH, Magdeburg (Germany). Sektion Gewaesserforschung; Rupp, H.; Meissner, R. [UFZ - Umweltforschungszentrum Leipzig-Halle GmbH, Falkenberg (Germany). Sektion Boden-/Gewaesserforschung; Lohse, M.; Buettner, O.; Friese, K. [UFZ - Umweltforschungszentrum Leipzig-Halle GmbH, Magdeburg (Germany). Sektion Gewaesserforschung; Miehlich, G. [Hamburg Univ. (Germany). Inst. fuer Bodenkunde

    2001-07-01

    Quality aims for land usage in flood plains have to be worked out in the Russian-German research project 'Effects of floods on the pollution of agricultural used flood plain soils of the Oka River and the Elbe River'. It is financed by the Germany Ministry of Education and Research (FKZ 02 WT 9617/0). Beside the characterisation of the present pollution of soils for the middle Elbe, it is necessary to prognosticate the current pollutant input. At the examination site nearby Wittenberge, Elbe River kilometers 435 and 440, natural deposited flood sediments were sampled by artificial lawn mats. By the geochemical characterisation it is possible to record the metal input into the flood plain and to win knowledge about the sedimentation process. The results of sediment investigation of the high flood in spring 1997 are presented. (orig.)

  11. 44 CFR 78.11 - Minimum project eligibility criteria.

    Science.gov (United States)

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD... activity in an approved Flood Mitigation Plan does not mean it meets FMA eligibility criteria. Projects... with the Flood Mitigation Plan; the type of project being proposed must be identified in the plan. (f...

  12. TWO-DIMENSIONAL MODELLING OF ACCIDENTAL FLOOD WAVES PROPAGATION

    OpenAIRE

    Lorand Catalin STOENESCU

    2011-01-01

    The study presented in this article describes a modern modeling methodology of the propagation of accidental flood waves in case a dam break; this methodology is applied in Romania for the first time for the pilot project „Breaking scenarios of Poiana Uzului dam”. The calculation programs used help us obtain a bidimensional calculation (2D) of the propagation of flood waves, taking into consideration the diminishing of the flood wave on a normal direction to the main direction; this diminishi...

  13. Long-term experiences with pluvial flood risk management

    Directory of Open Access Journals (Sweden)

    Fritsch Kathrina

    2016-01-01

    Full Text Available The awareness of pluvial (rain-related flood risk has grown significantly in the past few years but pluvial flooding is not handled with the same intensity throughout Europe. A variety of methods and modelling technologies are used to assess pluvial flood hazard and risk and to develop suggestions for flood mitigation measures. A brief overview of current model approaches is followed by the description of a modelling methodology that has been developed throughout the last 15 years with the focus on processing large scale areas. Experiences from several projects show that only high quality models of whole catchment areas yield results with enough accuracy to gain credibility among stakeholders, planners and the public. As a best practice example shows, the model approach also helps to plan effective decentral flood protection measures. To ensure successful flood risk management, a long-term preservation of flood risk awareness among local authorities and the public is necessary.

  14. Declining vulnerability to river floods and the global benefits of adaptation.

    Science.gov (United States)

    Jongman, Brenden; Winsemius, Hessel C; Aerts, Jeroen C J H; Coughlan de Perez, Erin; van Aalst, Maarten K; Kron, Wolfgang; Ward, Philip J

    2015-05-05

    The global impacts of river floods are substantial and rising. Effective adaptation to the increasing risks requires an in-depth understanding of the physical and socioeconomic drivers of risk. Whereas the modeling of flood hazard and exposure has improved greatly, compelling evidence on spatiotemporal patterns in vulnerability of societies around the world is still lacking. Due to this knowledge gap, the effects of vulnerability on global flood risk are not fully understood, and future projections of fatalities and losses available today are based on simplistic assumptions or do not include vulnerability. We show for the first time (to our knowledge) that trends and fluctuations in vulnerability to river floods around the world can be estimated by dynamic high-resolution modeling of flood hazard and exposure. We find that rising per-capita income coincided with a global decline in vulnerability between 1980 and 2010, which is reflected in decreasing mortality and losses as a share of the people and gross domestic product exposed to inundation. The results also demonstrate that vulnerability levels in low- and high-income countries have been converging, due to a relatively strong trend of vulnerability reduction in developing countries. Finally, we present projections of flood losses and fatalities under 100 individual scenario and model combinations, and three possible global vulnerability scenarios. The projections emphasize that materialized flood risk largely results from human behavior and that future risk increases can be largely contained using effective disaster risk reduction strategies.

  15. Identification of flood-rich and flood-poor periods in flood series

    Science.gov (United States)

    Mediero, Luis; Santillán, David; Garrote, Luis

    2015-04-01

    Recently, a general concern about non-stationarity of flood series has arisen, as changes in catchment response can be driven by several factors, such as climatic and land-use changes. Several studies to detect trends in flood series at either national or trans-national scales have been conducted. Trends are usually detected by the Mann-Kendall test. However, the results of this test depend on the starting and ending year of the series, which can lead to different results in terms of the period considered. The results can be conditioned to flood-poor and flood-rich periods located at the beginning or end of the series. A methodology to identify statistically significant flood-rich and flood-poor periods is developed, based on the comparison between the expected sampling variability of floods when stationarity is assumed and the observed variability of floods in a given series. The methodology is applied to a set of long series of annual maximum floods, peaks over threshold and counts of annual occurrences in peaks over threshold series observed in Spain in the period 1942-2009. Mediero et al. (2014) found a general decreasing trend in flood series in some parts of Spain that could be caused by a flood-rich period observed in 1950-1970, placed at the beginning of the flood series. The results of this study support the findings of Mediero et al. (2014), as a flood-rich period in 1950-1970 was identified in most of the selected sites. References: Mediero, L., Santillán, D., Garrote, L., Granados, A. Detection and attribution of trends in magnitude, frequency and timing of floods in Spain, Journal of Hydrology, 517, 1072-1088, 2014.

  16. Numerical simulation of flood barriers

    Science.gov (United States)

    Srb, Pavel; Petrů, Michal; Kulhavý, Petr

    This paper deals with testing and numerical simulating of flood barriers. The Czech Republic has been hit by several very devastating floods in past years. These floods caused several dozens of causalities and property damage reached billions of Euros. The development of flood measures is very important, especially for the reduction the number of casualties and the amount of property damage. The aim of flood control measures is the detention of water outside populated areas and drainage of water from populated areas as soon as possible. For new flood barrier design it is very important to know its behaviour in case of a real flood. During the development of the barrier several standardized tests have to be carried out. Based on the results from these tests numerical simulation was compiled using Abaqus software and some analyses were carried out. Based on these numerical simulations it will be possible to predict the behaviour of barriers and thus improve their design.

  17. Flood risk and insurance loss potential in the Thames Gateway

    Science.gov (United States)

    Eldridge, J.; Horn, D.

    2009-04-01

    The Thames Gateway, currently Europe's largest regeneration project, is an area of redevelopment located in the South East of England, with Government plans to create up to 160,000 new homes and 180,000 new jobs by 2016. Although the new development is intended to contribute £12bn annually to the economy, the potential flood risk is high, with much of the area situated on Thames tidal floodplain and vulnerable to both storm surges and peak river flows. This poses significant hazard to those inhabiting the area and has raised concern amongst the UK insurance industry, who would be liable for significant financial claims if a large flood event were to occur, particularly with respect to the number of new homes and businesses being built in flood risk areas. Flood risk and the potential damage to both lives and assets in vulnerable areas have gained substantial recognition, in light of recent flooding events, from both governmental agencies and in the public's awareness of flood hazard. This has resulted in a change in UK policy with planning policy for flood risk (PPS25, Planning Policy Statement 25) adopting a more strategic approach to development, as well as a new Flooding and Water Bill which is due for consultation in 2009. The Government and the Association of British Insurers, who represent the UK insurance industry, have also recently changed their Statement of Principles which guides provision of flood insurance in the future. This PhD research project aims to quantify flood risk in the Thames Gateway area with a view to evaluating the insurance loss potential under different insurance and planning scenarios. Using current sources of inundation extent, and incorporating varying insurance penetration rates and degrees of adoption of planning policy and guidance, it focuses on estimating flood risk under these different scenarios. This presentation introduces the development of the project and the theory and methodology which will be used to address the

  18. Reconstruction of the 1945 Wieringermeer Flood

    Science.gov (United States)

    Hoes, O. A. C.; Hut, R. W.; van de Giesen, N. C.; Boomgaard, M.

    2013-03-01

    The present state-of-the-art in flood risk assessment focuses on breach models, flood propagation models, and economic modelling of flood damage. However, models need to be validated with real data to avoid erroneous conclusions. Such reference data can either be historic data, or can be obtained from controlled experiments. The inundation of the Wieringermeer polder in the Netherlands in April 1945 is one of the few examples for which sufficient historical information is available. The objective of this article is to compare the flood simulation with flood data from 1945. The context, the breach growth process and the flood propagation are explained. Key findings for current flood risk management addresses the importance of the drainage canal network during the inundation of a polder, and the uncertainty that follows from not knowing the breach growth parameters. This case study shows that historical floods provide valuable data for the validation of models and reveal lessons that are applicable in current day flood risk management.

  19. Near Real-Time Flood Monitoring and Impact Assessment Systems. Chapter 6; [Case Study: 2011 Flooding in Southeast Asia

    Science.gov (United States)

    Ahamed, Aakash; Bolten, John; Doyle, C.; Fayne, Jessica

    2016-01-01

    Floods are the costliest natural disaster (United Nations 2004), causing approximately6.8 million deaths in the twentieth century alone (Doocy et al. 2013).Worldwide economic flood damage estimates in 2012 exceed $19 Billion USD(Munich Re 2013). Extended duration floods also pose longer term threats to food security, water, sanitation, hygiene, and community livelihoods, particularly in developing countries (Davies et al. 2014).Projections by the Intergovernmental Panel on Climate Change (IPCC) suggest that precipitation extremes, rainfall intensity, storm intensity, and variability are increasing due to climate change (IPCC 2007). Increasing hydrologic uncertainty will likely lead to unprecedented extreme flood events. As such, there is a vital need to enhance and further develop traditional techniques used to rapidly assessflooding and extend analytical methods to estimate impacted population and infrastructure.

  20. Project control - the next generation

    International Nuclear Information System (INIS)

    Iorii, V.F.; McKinnon, B.L.

    1993-01-01

    The Yucca Mountain Site Characterization Project (YMP) is the U.S. Department of Energy's (DOE) second largest Major System Acquisition Project. We have developed an integrated planning and control system (called PACS) that we believe represents the 'Next Generation' in project control. PACS integrates technical scope, cost, and schedule information for over 50 participating organizations and produces performances measurement reports for science and engineering managers at all levels. Our 'Next Generation' project control too, PACS, has been found to be in compliance with the new DOE Project Control System Guidelines. Additionally, the nuclear utility oversight group of the Edison Electric Institute has suggested PACS be used as a model for other civilian radioactive waste management projects. A 'Next Generation' project control tool will be necessary to do science in the 21st century

  1. Indian areas threatened by hydroelectric projects in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Aspelin, P L; Santos, S.C. dos

    1981-10-01

    In Brazil, as elsewhere, high priority is being given to developing domestic energy sources due to the spectacular increase in the cost of imported petroleum in recent years. This paper discusses the present situation of the thirty-two to thirty-four various Indian areas presently known to be threatened by seven major hydro-electric projects and one flood-control project, either planned or underway, in or directly involving Brazil. A total of at least 100,000 hectares of Indian land (or nearly one hectare for each remaining Brazilian Indian) will be flooded or otherwise expropriated by these projects. Past efforts by the Brazilian National Indian Foundation (FUNAI) to protect the Indians from the pressure of ''national development'' have not been sufficient. Research, planning, publicity, and political pressure are necessary to ensure that their efforts regarding these hydroelectric projects are more successful.

  2. Collaborative multi-stakeholder approach to drafting flood risk management plans in Wallonia, Belgium

    Science.gov (United States)

    Maroy, Edith; Javaux, Mathieu; Vandermosten, Pierre; Englebert, Benjamin

    2015-04-01

    The Flood Directive 2007/60/CE establishes a common framework within the European Union for assessing and reducing risks posed by floods on human health, the environment, economic activity and cultural heritage. For that purpose, Member States had to establish flood areas and flood risk maps, and subsequently, flood risk management plans (due December 2015). According to the Directive, special attention is to be paid to international coordination for transboundary water courses, integrated management approaches at the catchment scale, cost-effectiveness of measures and public involvement. Management measures must focus on reducing the probability of flooding and the potential consequences of flooding. They must cover prevention, protection and preparedness and must take into account relevant aspects, such as water management, soil management, spatial planning, land use and nature conservation. Floods in Wallonia mostly originate from overflowing of both little sloped rivers and highly reactive rivers but also, from concentrated runoff in the intensely cultivated and erosion-prone region north of the Sambre-Meuse axis. Consequently, walloon flood area maps not only show flood areas based on hydraulic modelling and observations but also runoff concentration axis in agricultural areas. Now released to the public, this information can be used to assess the risk of damage for land planning and erosion control strategies. Incidentally, some 166 km2 were mapped as flood hazard area with a return period of 25 years, 28.8 of which are urbanized or destined to urbanisation and counting of number of approximatively 39.000 people living in those areas. Flood area and flood risk maps should be the starting point of elaborating flood risk management plans. In order to involve the diversity of water managers and stakeholders in the drafting of a management plan for hydrographic districts in Wallonia, responsible authorities decided to mandate scientists and engineers to organize

  3. Surfactant loss control in chemical flooding: Spectroscopic and calorimetric study of adsorption and precipitation on reservoir minerals. Annual report, September 30, 1992--September 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Somasundaran, P.

    1994-07-01

    The aim of this research project is to investigate mechanisms underlying adsorption and surface precipitation of flooding surfactants on reservoir minerals. Effects of surfactant structure, surfactant combinations, various inorganic and polymeric species, and solids mineralogy will be determined. A multi-pronged approach consisting of micro & nano spectroscopy, microcalorimetry, electrokinetics, surface tension and wettability; is used in this study. The results obtained should help in controlling surfactant loss in chemical flooding and in developing optimum structures and conditions for efficient chemical flooding processes. During the first year of this three year contract, adsorption of single surfactants and select surfactant mixtures was studied at the solid-liquid and gas-liquid interfaces. Surfactants studied include alkyl xylene sulfonates, polyethoxylated alkyl phenols, octaethylene glycol mono n-decyl ether, and tetradecyl trimethyl ammonium chloride. Adsorption of surfactant mixtures of varying composition was also investigated. The microstructure of the adsorbed layer was characterized using fluorescence spectroscopy. Changes interfacial properties such as wettability, electrokinetics and stability of reservoir minerals were correlated with the amount of reagent adsorbed. Strong effects of the structure of the surfactant and position of functional groups were revealed.

  4. Toward more flood resilience: Is a diversification of flood risk management strategies the way forward?

    Directory of Open Access Journals (Sweden)

    Dries L. T. Hegger

    2016-12-01

    Full Text Available European countries face increasing flood risks because of urbanization, increase of exposure and damage potential, and the effects of climate change. In literature and in practice, it is argued that a diversification of strategies for flood risk management (FRM, including flood risk prevention (through proactive spatial planning, flood defense, flood risk mitigation, flood preparation, and flood recovery, makes countries more flood resilient. Although this thesis is plausible, it should still be empirically scrutinized. We aim to do this. Drawing on existing literature we operationalize the notion of "flood resilience" into three capacities: capacity to resist; capacity to absorb and recover; and capacity to transform and adapt. Based on findings from the EU FP7 project STAR-FLOOD, we explore the degree of diversification of FRM strategies and related flood risk governance arrangements at the national level in Belgium, England, France, the Netherlands, Poland, and Sweden, as well as these countries' achievement in terms of the three capacities. We found that the Netherlands and to a lesser extent Belgium have a strong capacity to resist, France a strong capacity to absorb and recover, and especially England a high capacity to transform and adapt. Having a diverse portfolio of FRM strategies in place may be conducive to high achievements related to the capacities to absorb/recover and to transform and adapt. Hence, we conclude that diversification of FRM strategies contributes to resilience. However, the diversification thesis should be nuanced in the sense that there are different ways to be resilient. First, the three capacities imply different rationales and normative starting points for flood risk governance, the choice between which is inherently political. Second, we found trade-offs between the three capacities, e.g., being resistant seems to lower the possibility to be absorbent. Third, to explain countries' achievements in terms of

  5. Integrated Flood Forecast and Virtual Dam Operation System for Water Resources and Flood Risk Management

    Science.gov (United States)

    Shibuo, Yoshihiro; Ikoma, Eiji; Lawford, Peter; Oyanagi, Misa; Kanauchi, Shizu; Koudelova, Petra; Kitsuregawa, Masaru; Koike, Toshio

    2014-05-01

    While availability of hydrological- and hydrometeorological data shows growing tendency and advanced modeling techniques are emerging, such newly available data and advanced models may not always be applied in the field of decision-making. In this study we present an integrated system of ensemble streamflow forecast (ESP) and virtual dam simulator, which is designed to support river and dam manager's decision making. The system consists of three main functions: real time hydrological model, ESP model, and dam simulator model. In the real time model, the system simulates current condition of river basins, such as soil moisture and river discharges, using LSM coupled distributed hydrological model. The ESP model takes initial condition from the real time model's output and generates ESP, based on numerical weather prediction. The dam simulator model provides virtual dam operation and users can experience impact of dam control on remaining reservoir volume and downstream flood under the anticipated flood forecast. Thus the river and dam managers shall be able to evaluate benefit of priori dam release and flood risk reduction at the same time, on real time basis. Furthermore the system has been developed under the concept of data and models integration, and it is coupled with Data Integration and Analysis System (DIAS) - a Japanese national project for integrating and analyzing massive amount of observational and model data. Therefore it has advantage in direct use of miscellaneous data from point/radar-derived observation, numerical weather prediction output, to satellite imagery stored in data archive. Output of the system is accessible over the web interface, making information available with relative ease, e.g. from ordinary PC to mobile devices. We have been applying the system to the Upper Tone region, located northwest from Tokyo metropolitan area, and we show application example of the system in recent flood events caused by typhoons.

  6. Aligning Natural Resource Conservation and Flood Hazard Mitigation in California.

    Science.gov (United States)

    Calil, Juliano; Beck, Michael W; Gleason, Mary; Merrifield, Matthew; Klausmeyer, Kirk; Newkirk, Sarah

    2015-01-01

    Flooding is the most common and damaging of all natural disasters in the United States, and was a factor in almost all declared disasters in U.S. Direct flood losses in the U.S. in 2011 totaled $8.41 billion and flood damage has also been on the rise globally over the past century. The National Flood Insurance Program paid out more than $38 billion in claims since its inception in 1968, more than a third of which has gone to the one percent of policies that experienced multiple losses and are classified as "repetitive loss." During the same period, the loss of coastal wetlands and other natural habitat has continued, and funds for conservation and restoration of these habitats are very limited. This study demonstrates that flood losses could be mitigated through action that meets both flood risk reduction and conservation objectives. We found that there are at least 11,243km2 of land in coastal California, which is both flood-prone and has natural resource conservation value, and where a property/structure buyout and habitat restoration project could meet multiple objectives. For example, our results show that in Sonoma County, the extent of land that meets these criteria is 564km2. Further, we explore flood mitigation grant programs that can be a significant source of funds to such projects. We demonstrate that government funded buyouts followed by restoration of targeted lands can support social, environmental, and economic objectives: reduction of flood exposure, restoration of natural resources, and efficient use of limited governmental funds.

  7. Aligning Natural Resource Conservation and Flood Hazard Mitigation in California.

    Directory of Open Access Journals (Sweden)

    Juliano Calil

    Full Text Available Flooding is the most common and damaging of all natural disasters in the United States, and was a factor in almost all declared disasters in U.S.Direct flood losses in the U.S. in 2011 totaled $8.41 billion and flood damage has also been on the rise globally over the past century. The National Flood Insurance Program paid out more than $38 billion in claims since its inception in 1968, more than a third of which has gone to the one percent of policies that experienced multiple losses and are classified as "repetitive loss." During the same period, the loss of coastal wetlands and other natural habitat has continued, and funds for conservation and restoration of these habitats are very limited. This study demonstrates that flood losses could be mitigated through action that meets both flood risk reduction and conservation objectives. We found that there are at least 11,243km2 of land in coastal California, which is both flood-prone and has natural resource conservation value, and where a property/structure buyout and habitat restoration project could meet multiple objectives. For example, our results show that in Sonoma County, the extent of land that meets these criteria is 564km2. Further, we explore flood mitigation grant programs that can be a significant source of funds to such projects. We demonstrate that government funded buyouts followed by restoration of targeted lands can support social, environmental, and economic objectives: reduction of flood exposure, restoration of natural resources, and efficient use of limited governmental funds.

  8. Urban flood return period assessment through rainfall-flood response modelling

    Science.gov (United States)

    Murla Tuyls, Damian; Thorndahl, Søren

    2017-04-01

    order to guarantee quality of the assessment, especially in design of complex UDS, where features as the main slope, hydraulic capacity, permeability, etc. can play an important role. In addition, a novel approach has been applied to map the response time (Tc) of the flood prone areas of the system under study. Together with the flood area and volume RP estimates this provides valuable knowledge suggesting to consider the different subareas of the UDS for design purposes and to establish a robust database that allows urban areas to be resilient against the severe impact of rainfall. Acknowledgement to ERA-NET Cofund Water Works 2014 (project MUFFIN) for the partial funding of this research; to the Danish Wastewater Pollution Committee and the Danish Meteorological Institute (DMI) for providing the rainfall dataset; to the Danish Geodata Agency for providing the DTM data and to DHI for providing license to MIKE software packages. The applied model has been made available for this study by Aarhus Water Utility Services. References DHI, 2014. MIKE by DHI software package 2014. Hørsholm, DK. DS/EN 752, 2008. Drain and sewer systems outside buildings.

  9. Flood risk management for large reservoirs

    International Nuclear Information System (INIS)

    Poupart, M.

    2006-01-01

    Floods are a major risk for dams: uncontrolled reservoir water level may cause dam overtopping, and then its failure, particularly for fill dams. Poor control of spillway discharges must be taken into consideration too, as it can increase the flood consequences downstream. In both cases, consequences on the public or on properties may be significant. Spillway design to withstand extreme floods is one response to these risks, but must be complemented by strict operating rules: hydrological forecasting, surveillance and periodic equipment controls, operating guides and the training of operators are mandatory too, in order to guarantee safe operations. (author)

  10. Erosion control and protection from torrential floods in Serbia-spatial aspects

    Directory of Open Access Journals (Sweden)

    Ristić Ratko

    2011-01-01

    Full Text Available Torrential floods represent the most frequent phenomenon within the category of “natural risks” in Serbia. The representative examples are the torrential floods on the experimental watersheds of the rivers Manastirica (June 1996 and Kamišna (May 2007. Hystorical maximal discharges (Qmaxh were reconstructed by use of ″hydraulics flood traces″ method. Computations of maximal discharges (Qmaxc, under hydrological conditions after the restoration of the watersheds, were performed by use of a synthetic unit hydrograph theory and Soil Conservation Service methodology. Area sediment yields and intensity of erosion processes were estimated on the basis of the “Erosion Potential Method”. The actual state of erosion processes is represented by the coefficients of erosion Z=0.475 (Manastirica and Z=0.470 (Kamišna. Restoration works have been planned with a view to decreasing yields of erosive material, increasing water infiltration capacity and reducing flood runoff. The planned state of erosion processes is represented by the coefficients of erosion Z=0.343 (Manastirica and Z=0.385 (Kamišna. The effects of hydrological changes were estimated by the comparison of historical maximal discharges and computed maximal discharges (under the conditions after the planned restoration. The realisation of restoration works will help decrease annual yields of erosive material from Wа=24357 m3 to Wа=16198.0 m3 (Manastirica and from Wа=19974 m3 to Wа=14434 m3 (Kamišna. The values of historical maximal discharges (QmaxhMan=154.9 m3•s-1; QmaxhKam=76.3 m3•s-1 were significantly decreased after the restoration (QmaxcMan=84.5 m3 •s-1; QmaxcKam=43.7 m3•s-1, indicating the improvement of hydrological conditions, as a direct consequence of erosion and torrent control works. Integrated management involves biotechnical works on the watershed, technical works on the hydrographic network within a precisely defined administrative and spatial framework in

  11. Post Waterflood CO2 Miscible Flood in Light Oil, Fluvial-Dominated Deltaic Reservoir (Pre-Work and Project Proposal - Appendix); FINAL

    International Nuclear Information System (INIS)

    Bou-Mikael, Sami

    2002-01-01

    The main objective of the Port Neches Project was to determine the feasibility and producibility of CO2 miscible flooding techniques enhanced with horizontal drilling applied to a Fluvial Dominated Deltaic reservoir. The second was to disseminate the knowledge gained through established Technology Transfer mechanisms to support DOE's programmatic objectives of increasing domestic oil production and reducing abandonment of oil fields

  12. Future changes in atmospheric rivers and their implications for winter flooding in Britain

    International Nuclear Information System (INIS)

    Lavers, David A; Allan, Richard P; Brayshaw, David J; Villarini, Gabriele; Lloyd-Hughes, Benjamin; Wade, Andrew J

    2013-01-01

    Within the warm conveyor belt of extra-tropical cyclones, atmospheric rivers (ARs) are the key synoptic features which deliver the majority of poleward water vapour transport, and are associated with episodes of heavy and prolonged rainfall. ARs are responsible for many of the largest winter floods in the mid-latitudes resulting in major socioeconomic losses; for example, the loss from United Kingdom (UK) flooding in summer/winter 2012 is estimated to be about $1.6 billion in damages. Given the well-established link between ARs and peak river flows for the present day, assessing how ARs could respond under future climate projections is of importance in gauging future impacts from flooding. We show that North Atlantic ARs are projected to become stronger and more numerous in the future scenarios of multiple simulations from five state-of-the-art global climate models (GCMs) in the fifth Climate Model Intercomparison Project (CMIP5). The increased water vapour transport in projected ARs implies a greater risk of higher rainfall totals and therefore larger winter floods in Britain, with increased AR frequency leading to more flood episodes. In the high emissions scenario (RCP8.5) for 2074–2099 there is an approximate doubling of AR frequency in the five GCMs. Our results suggest that the projected change in ARs is predominantly a thermodynamic response to warming resulting from anthropogenic radiative forcing. (letter)

  13. Simulation of Columbia River Floods in the Hanford Reach

    Energy Technology Data Exchange (ETDEWEB)

    Waichler, Scott R.; Serkowski, John A.; Perkins, William A.; Richmond, Marshall C.

    2017-01-30

    Columbia River water elevations and flows in the Hanford Reach affect the environment and facilities along the shoreline, including movement of contaminants in groundwater, fish habitat, and infrastructure subject to flooding. This report describes the hydraulic simulation of hypothetical flood flows using the best available topographic and bathymetric data for the Hanford Reach and the Modular Aquatic Simulation System in 1 Dimension (MASS1) hydrodynamic model. The MASS1 model of the Hanford Reach was previously calibrated to field measurements of water surface elevations. The current model setup can be used for other studies of flow, water levels, and temperature in the Reach. The existing MASS1 channel geometry and roughness and other model configuration inputs for the Hanford Reach were used for this study, and previous calibration and validation results for the model are reprinted here for reference. The flood flows for this study were simulated by setting constant flow rates obtained from the U.S. Army Corps of Engineers (USACE) for the Columbia, Snake, and Yakima Rivers, and a constant water level at McNary Dam, and then running the model to steady state. The discharge levels simulated were all low-probability events; for example, a 100-year flood is one that would occur on average every 100 years, or put another way, in any given year there is a 1% chance that a discharge of that level or higher will occur. The simulated floods and their corresponding Columbia River discharges were 100-year (445,000 cfs), 500-year (520,000 cfs), and the USACE-defined Standard Project Flood (960,000 cfs). The resulting water levels from the steady-state floods can be viewed as “worst case” outcomes for the respective discharge levels. The MASS1 output for water surface elevations was converted to the North American Vertical Datum of 1988 and projected across the channel and land surface to enable mapping of the floodplain for each scenario. Floodplain maps show that for

  14. Flood-Ring Formation and Root Development in Response to Experimental Flooding of Young Quercus robur Trees

    Science.gov (United States)

    Copini, Paul; den Ouden, Jan; Robert, Elisabeth M. R.; Tardif, Jacques C.; Loesberg, Walter A.; Goudzwaard, Leo; Sass-Klaassen, Ute

    2016-01-01

    Spring flooding in riparian forests can cause significant reductions in earlywood-vessel size in submerged stem parts of ring-porous tree species, leading to the presence of ‘flood rings’ that can be used as a proxy to reconstruct past flooding events, potentially over millennia. The mechanism of flood-ring formation and the relation with timing and duration of flooding are still to be elucidated. In this study, we experimentally flooded 4-year-old Quercus robur trees at three spring phenophases (late bud dormancy, budswell, and internode expansion) and over different flooding durations (2, 4, and 6 weeks) to a stem height of 50 cm. The effect of flooding on root and vessel development was assessed immediately after the flooding treatment and at the end of the growing season. Ring width and earlywood-vessel size and density were measured at 25- and 75-cm stem height and collapsed vessels were recorded. Stem flooding inhibited earlywood-vessel development in flooded stem parts. In addition, flooding upon budswell and internode expansion led to collapsed earlywood vessels below the water level. At the end of the growing season, mean earlywood-vessel size in the flooded stem parts (upon budswell and internode expansion) was always reduced by approximately 50% compared to non-flooded stem parts and 55% compared to control trees. This reduction was already present 2 weeks after flooding and occurred independent of flooding duration. Stem and root flooding were associated with significant root dieback after 4 and 6 weeks and mean radial growth was always reduced with increasing flooding duration. By comparing stem and root flooding, we conclude that flood rings only occur after stem flooding. As earlywood-vessel development was hampered during flooding, a considerable number of narrow earlywood vessels present later in the season, must have been formed after the actual flooding events. Our study indicates that root dieback, together with strongly reduced hydraulic

  15. Scoping of flood hazard mapping needs for Kennebec County, Maine

    Science.gov (United States)

    Dudley, Robert W.; Schalk, Charles W.

    2006-01-01

    . However, in the ensuing 20-30 years, development has occurred in many of the watersheds, and the characteristics of the watersheds have changed with time. Therefore, many of the older studies may not depict current conditions nor accurately estimate risk in terms of flood heights. The following is the scope of work as defined in the FEMA/USGS Statement of Work: Task 1: Collect data from a variety of sources including community surveys, other Federal and State Agencies, National Flood Insurance Program (NFIP) State Coordinators, Community Assistance Visits (CAVs) and FEMA archives. Lists of mapping needs will be obtained from the MNUSS database, community surveys, and CAVs, if available. FEMA archives will be inventoried for effective FIRM panels, FIS reports, and other flood-hazard data or existing study data. Best available base map information, topographic data, flood-hazard data, and hydrologic and hydraulic data will be identified. Data from the Maine Floodplain Management Program database also will be utilized. Task 2: Contact communities in Kennebec County to notify them that FEMA and the State have selected them for a map update, and that a project scope will be developed with their input. Topics to be reviewed with the communities include (1) Purpose of the Flood Map Project (for example, the update needs that have prompted the map update); (2) The community's mapping needs; (3) The community's available mapping, hydrologic, hydraulic, and flooding information; (4) target schedule for completing the project; and (5) The community's engineering, planning, and geographic information system (GIS) capabilities. On the basis of the collected information from Task 1 and community contacts/meetings in Task 2, the USGS will develop a Draft Project Scope for the identified mapping needs of the communities in Kennebec County. The following items will be addressed in the Draft Project Scope: review of available information, determine if and how e

  16. Scoping of flood hazard mapping needs for Somerset County, Maine

    Science.gov (United States)

    Dudley, Robert W.; Schalk, Charles W.

    2006-01-01

    s. However, in the ensuing 20-30 years, development has occurred in many of the watersheds, and the characteristics of the watersheds have changed with time. Therefore, many of the older studies may not depict current conditions nor accurately estimate risk in terms of flood heights. The following is the scope of work as defined in the FEMA/USGS Statement of Work: Task 1: Collect data from a variety of sources including community surveys, other Federal and State Agencies, National Flood Insurance Program (NFIP) State Coordinators, Community Assistance Visits (CAVs) and FEMA archives. Lists of mapping needs will be obtained from the MNUSS database, community surveys, and CAVs, if available. FEMA archives will be inventoried for effective FIRM panels, FIS reports, and other flood-hazard data or existing study data. Best available base map information, topographic data, flood-hazard data, and hydrologic and hydraulic data will be identified. Data from the Maine Floodplain Management Program database also will be utilized. Task 2: Contact communities in Somerset County to notify them that FEMA and the State have selected them for a map update, and that a project scope will be developed with their input. Topics to be reviewed with the communities include (1) Purpose of the Flood Map Project (for example, the update needs that have prompted the map update); (2) The community's mapping needs; (3) The community's available mapping, hydrologic, hydraulic, and flooding information; (4) target schedule for completing the project; and (5) The community's engineering, planning, and geographic information system (GIS) capabilities. On the basis of the collected information from Task 1 and community contacts/meetings in Task 2, the USGS will develop a Draft Project Scope for the identified mapping needs of the communities in Somerset County. The following items will be addressed in the Draft Project Scope: review of available information, determine if and ho

  17. The Impact of Climate Change on New York City's Coastal Flood Hazard: Increasing Flood Heights from the Pre-Industrial to 2300 CE

    Science.gov (United States)

    Garner, A. J.; Mann, M. E.; Emanuel, K.; Kopp, R. E.; Lin, N.; Alley, R. B.; Horton, B.; Deconto, R. M.; Donnelly, J. P.; Pollard, D.

    2017-12-01

    The flood hazard in New York City depends on both storm surges and rising sea levels. We combine modeled storm surges with probabilistic sea-level rise projections to assess future coastal inundation in New York City from the pre-industrial through 2300 CE. The storm surges are derived from large sets of synthetic tropical cyclones, downscaled from RCP 8.5 runs of three CMIP5 models. The sea-level rise projections include the collapse of the Antarctic ice sheet to assess future coastal inundation. CMIP5 models indicate that there will be minimal change in storm-surge heights from 2010 to 2100 or 2300, because the predicted strengthening of the strongest storms will be compensated by storm tracks moving offshore at the latitude of New York City. However, projected sea-level rise causes overall flood heights associated with tropical cyclones in New York City in coming centuries to increase greatly compared to pre-industrial or modern flood heights. We find that the 1-in-500-year flood event increases from 3.4 m above mean tidal level during 1970-2005 to 3.9 - 4.8 m above mean tidal level by 2080-2100, and ranges from 2.8 - 13.0 m above mean tidal level by 2280-2300. Further, we find that the return period of a 2.25 m flood has decreased from 500 years prior to 1800 to 25 years during 1970-2005, and further decreases to 5 years by 2030 - 2045 in 95% of our simulations.

  18. Optimal control of diarrhea transmission in a flood evacuation zone

    Science.gov (United States)

    Erwina, N.; Aldila, D.; Soewono, E.

    2014-03-01

    Evacuation of residents and diarrhea disease outbreak in evacuation zone have become serious problem that frequently happened during flood periods. Limited clean water supply and infrastructure in evacuation zone contribute to a critical spread of diarrhea. Transmission of diarrhea disease can be reduced by controlling clean water supply and treating diarrhea patients properly. These treatments require significant amount of budget, which may not be fulfilled in the fields. In his paper, transmission of diarrhea disease in evacuation zone using SIRS model is presented as control optimum problem with clean water supply and rate of treated patients as input controls. Existence and stability of equilibrium points and sensitivity analysis are investigated analytically for constant input controls. Optimum clean water supply and rate of treatment are found using optimum control technique. Optimal results for transmission of diarrhea and the corresponding controls during the period of observation are simulated numerically. The optimum result shows that transmission of diarrhea disease can be controlled with proper combination of water supply and rate of treatment within allowable budget.

  19. Flood frequency analysis of historical flood data under stationary and non-stationary modelling

    Science.gov (United States)

    Machado, M. J.; Botero, B. A.; López, J.; Francés, F.; Díez-Herrero, A.; Benito, G.

    2015-06-01

    Historical records are an important source of information on extreme and rare floods and fundamental to establish a reliable flood return frequency. The use of long historical records for flood frequency analysis brings in the question of flood stationarity, since climatic and land-use conditions can affect the relevance of past flooding as a predictor of future flooding. In this paper, a detailed 400 yr flood record from the Tagus River in Aranjuez (central Spain) was analysed under stationary and non-stationary flood frequency approaches, to assess their contribution within hazard studies. Historical flood records in Aranjuez were obtained from documents (Proceedings of the City Council, diaries, chronicles, memoirs, etc.), epigraphic marks, and indirect historical sources and reports. The water levels associated with different floods (derived from descriptions or epigraphic marks) were computed into discharge values using a one-dimensional hydraulic model. Secular variations in flood magnitude and frequency, found to respond to climate and environmental drivers, showed a good correlation between high values of historical flood discharges and a negative mode of the North Atlantic Oscillation (NAO) index. Over the systematic gauge record (1913-2008), an abrupt change on flood magnitude was produced in 1957 due to constructions of three major reservoirs in the Tagus headwaters (Bolarque, Entrepeñas and Buendia) controlling 80% of the watershed surface draining to Aranjuez. Two different models were used for the flood frequency analysis: (a) a stationary model estimating statistical distributions incorporating imprecise and categorical data based on maximum likelihood estimators, and (b) a time-varying model based on "generalized additive models for location, scale and shape" (GAMLSS) modelling, which incorporates external covariates related to climate variability (NAO index) and catchment hydrology factors (in this paper a reservoir index; RI). Flood frequency

  20. Nested 1D-2D approach for urban surface flood modeling

    Science.gov (United States)

    Murla, Damian; Willems, Patrick

    2015-04-01

    Floods in urban areas as a consequence of sewer capacity exceedance receive increased attention because of trends in urbanization (increased population density and impermeability of the surface) and climate change. Despite the strong recent developments in numerical modeling of water systems, urban surface flood modeling is still a major challenge. Whereas very advanced and accurate flood modeling systems are in place and operation by many river authorities in support of flood management along rivers, this is not yet the case in urban water management. Reasons include the small scale of the urban inundation processes, the need to have very high resolution topographical information available, and the huge computational demands. Urban drainage related inundation modeling requires a 1D full hydrodynamic model of the sewer network to be coupled with a 2D surface flood model. To reduce the computational times, 0D (flood cones), 1D/quasi-2D surface flood modeling approaches have been developed and applied in some case studies. In this research, a nested 1D/2D hydraulic model has been developed for an urban catchment at the city of Gent (Belgium), linking the underground sewer (minor system) with the overland surface (major system). For the overland surface flood modelling, comparison was made of 0D, 1D/quasi-2D and full 2D approaches. The approaches are advanced by considering nested 1D-2D approaches, including infiltration in the green city areas, and allowing the effects of surface storm water storage to be simulated. An optimal nested combination of three different mesh resolutions was identified; based on a compromise between precision and simulation time for further real-time flood forecasting, warning and control applications. Main streets as mesh zones together with buildings as void regions constitute one of these mesh resolution (3.75m2 - 15m2); they have been included since they channel most of the flood water from the manholes and they improve the accuracy of

  1. Structural master plan of flood mitigation measures

    Directory of Open Access Journals (Sweden)

    A. Heidari

    2009-01-01

    Full Text Available Flood protection is one of the practical methods in damage reduction. Although it not possible to be completely protected from flood disaster but major part of damages can be reduced by mitigation plans. In this paper, the optimum flood mitigation master plan is determined by economic evaluation in trading off between the construction costs and expected value of damage reduction as the benefits. Size of the certain mitigation alternative is also be obtained by risk analysis by accepting possibility of flood overtopping. Different flood mitigation alternatives are investigated from various aspects in the Dez and Karun river floodplain areas as a case study in south west of IRAN. The results show that detention dam and flood diversion are the best alternatives of flood mitigation methods as well as enforcing the flood control purpose of upstream multipurpose reservoirs. Dyke and levees are not mostly justifiable because of negative impact on down stream by enhancing routed flood peak discharge magnitude and flood damages as well.

  2. Flood precautionary behaviour of private households in Can Tho city in the Mekong Delta

    Science.gov (United States)

    Kreibich, Heidi; Gani Adnan, Sarfaraz; Thi Chinh, Do; Bubeck, Philip

    2015-04-01

    Flood risk is high and it is projected to increase in many places due to the effects of climate change and the on-going intensification of human activities in risk-prone areas. These projections and the considerable uncertainties associated with these developments increasingly require integrated approaches in flood risk management. In addition to flood protection, private precautionary measures aim at reducing the potential negative consequences of floods. Thus, insights into flood precautionary behaviour are important. This study is grounded on the Protection Motivation Theory (PMT), which refers to the cognitive process that people undergo when evaluating their own ability to avoid a certain risk. Results of a survey among 858 flood-prone households in Can Tho city in the Mekong Delta, Vietnam are presented. It is shown that flood-coping appraisal is an important variable in terms of precautionary behaviour. Thus, risk communication should focus more on the potential of precautionary measures to effectively reduce flood damage, as well as on information about how to implement such measures in practice.

  3. Continuous hydrologic simulation and flood-frequency, hydraulic, and flood-hazard analysis of the Blackberry Creek watershed, Kane County, Illinois

    Science.gov (United States)

    Soong, David T.; Straub, Timothy D.; Murphy, Elizabeth A.

    2006-01-01

    Results of hydrologic model, flood-frequency, hydraulic model, and flood-hazard analysis of the Blackberry Creek watershed in Kane County, Illinois, indicate that the 100-year and 500-year flood plains range from approximately 25 acres in the tributary F watershed (a headwater subbasin at the northeastern corner of the watershed) to almost 1,800 acres in Blackberry Creek main stem. Based on 1996 land-cover data, most of the land in the 100-year and 500-year flood plains was cropland, forested and wooded land, and grassland. A relatively small percentage of urban land was in the flood plains. The Blackberry Creek watershed has undergone rapid urbanization in recent decades. The population and urbanized lands in the watershed are projected to double from the 1990 condition by 2020. Recently, flood-induced damage has occurred more frequently in urbanized areas of the watershed. There are concerns about the effect of urbanization on flood peaks and volumes, future flood-mitigation plans, and potential effects on the water quality and stream habitats. This report describes the procedures used in developing the hydrologic models, estimating the flood-peak discharge magnitudes and recurrence intervals for flood-hazard analysis, developing the hydraulic model, and the results of the analysis in graphical and tabular form. The hydrologic model, Hydrological Simulation Program-FORTRAN (HSPF), was used to perform the simulation of continuous water movements through various patterns of land uses in the watershed. Flood-frequency analysis was applied to an annual maximum series to determine flood quantiles in subbasins for flood-hazard analysis. The Hydrologic Engineering Center-River Analysis System (HEC-RAS) hydraulic model was used to determine the 100-year and 500-year flood elevations, and to determine the 100-year floodway. The hydraulic model was calibrated and verified using high water marks and observed inundation maps for the July 17-18, 1996, flood event. Digital

  4. Simulating Catchment Scale Afforestation for Mitigating Flooding

    Science.gov (United States)

    Barnes, M. S.; Bathurst, J. C.; Quinn, P. F.; Birkinshaw, S.

    2016-12-01

    After the 2013-14, and the more recent 2015-16, winter floods in the UK there were calls to 'forest the uplands' as a solution to reducing flood risk across the nation. However, the role of forests as a natural flood management practice remains highly controversial, due to a distinct lack of robust evidence into its effectiveness in reducing flood risk during extreme events. This project aims to improve the understanding of the impacts of upland afforestation on flood risk at the sub-catchment and full catchment scales. This will be achieved through an integrated fieldwork and modelling approach, with the use of a series of process based hydrological models to scale up and examine the effects forestry can have on flooding. Furthermore, there is a need to analyse the extent to which land management practices, catchment system engineering and the installation of runoff attenuation features (RAFs), such as engineered log jams, in headwater catchments can attenuate flood-wave movement, and potentially reduce downstream flood risk. Additionally, the proportion of a catchment or riparian reach that would need to be forested in order to achieve a significant impact on reducing downstream flooding will be defined. The consequential impacts of a corresponding reduction in agriculturally productive farmland and the potential decline of water resource availability will also be considered in order to safeguard the UK's food security and satisfy the global demand on water resources.

  5. Crowdsourcing detailed flood data

    Science.gov (United States)

    Walliman, Nicholas; Ogden, Ray; Amouzad*, Shahrzhad

    2015-04-01

    in the more generalised RASP project (DEFRA and the Environment Agency), and in line with the expressed needs of the ABI (Association of British Insurers) and National Flood Forum. The detailed data produced will also support improved flood risk assessment for the provision of affordable insurance.

  6. Incorporating Daily Flood Control Objectives Into a Monthly Stochastic Dynamic Programing Model for a Hydroelectric Complex

    Science.gov (United States)

    Druce, Donald J.

    1990-01-01

    A monthly stochastic dynamic programing model was recently developed and implemented at British Columbia (B.C.) Hydro to provide decision support for short-term energy exports and, if necessary, for flood control on the Peace River in northern British Columbia. The model establishes the marginal cost of supplying energy from the B.C. Hydro system, as well as a monthly operating policy for the G.M. Shrum and Peace Canyon hydroelectric plants and the Williston Lake storage reservoir. A simulation model capable of following the operating policy then determines the probability of refilling Williston Lake and possible spill rates and volumes. Reservoir inflows are input to both models in daily and monthly formats. The results indicate that flood control can be accommodated without sacrificing significant export revenue.

  7. Incorporating daily flood control objectives into a monthly stochastic dynamic programming model for a hydroelectric complex

    Energy Technology Data Exchange (ETDEWEB)

    Druce, D.J. (British Columbia Hydro and Power Authority, Vancouver, British Columbia (Canada))

    1990-01-01

    A monthly stochastic dynamic programing model was recently developed and implemented at British Columbia (B.C.) Hydro to provide decision support for short-term energy exports and, if necessary, for flood control on the Peace River in northern British Columbia. The model established the marginal cost of supplying energy from the B.C. Hydro system, as well as a monthly operating policy for the G.M. Shrum and Peace Canyon hydroelectric plants and the Williston Lake storage reservoir. A simulation model capable of following the operating policy then determines the probability of refilling Williston Lake and possible spill rates and volumes. Reservoir inflows are input to both models in daily and monthly formats. The results indicate that flood control can be accommodated without sacrificing significant export revenue.

  8. Scales of Natural Flood Management

    Science.gov (United States)

    Nicholson, Alex; Quinn, Paul; Owen, Gareth; Hetherington, David; Piedra Lara, Miguel; O'Donnell, Greg

    2016-04-01

    The scientific field of Natural flood Management (NFM) is receiving much attention and is now widely seen as a valid solution to sustainably manage flood risk whilst offering significant multiple benefits. However, few examples exist looking at NFM on a large scale (>10km2). Well-implemented NFM has the effect of restoring more natural catchment hydrological and sedimentological processes, which in turn can have significant flood risk and WFD benefits for catchment waterbodies. These catchment scale improvements in-turn allow more 'natural' processes to be returned to rivers and streams, creating a more resilient system. Although certain NFM interventions may appear distant and disconnected from main stem waterbodies, they will undoubtedly be contributing to WFD at the catchment waterbody scale. This paper offers examples of NFM, and explains how they can be maximised through practical design across many scales (from feature up to the whole catchment). New tools to assist in the selection of measures and their location, and to appreciate firstly, the flooding benefit at the local catchment scale and then show a Flood Impact Model that can best reflect the impacts of local changes further downstream. The tools will be discussed in the context of our most recent experiences on NFM projects including river catchments in the north east of England and in Scotland. This work has encouraged a more integrated approach to flood management planning that can use both traditional and novel NFM strategies in an effective and convincing way.

  9. Real-Time Flood Control by Tree-Based Model Predictive Control Including Forecast Uncertainty: A Case Study Reservoir in Turkey

    Directory of Open Access Journals (Sweden)

    Gökçen Uysal

    2018-03-01

    Full Text Available Optimal control of reservoirs is a challenging task due to conflicting objectives, complex system structure, and uncertainties in the system. Real time control decisions suffer from streamflow forecast uncertainty. This study aims to use Probabilistic Streamflow Forecasts (PSFs having a lead-time up to 48 h as input for the recurrent reservoir operation problem. A related technique for decision making is multi-stage stochastic optimization using scenario trees, referred to as Tree-based Model Predictive Control (TB-MPC. Deterministic Streamflow Forecasts (DSFs are provided by applying random perturbations on perfect data. PSFs are synthetically generated from DSFs by a new approach which explicitly presents dynamic uncertainty evolution. We assessed different variables in the generation of stochasticity and compared the results using different scenarios. The developed real-time hourly flood control was applied to a test case which had limited reservoir storage and restricted downstream condition. According to hindcasting closed-loop experiment results, TB-MPC outperforms the deterministic counterpart in terms of decreased downstream flood risk according to different independent forecast scenarios. TB-MPC was also tested considering different number of tree branches, forecast horizons, and different inflow conditions. We conclude that using synthetic PSFs in TB-MPC can provide more robust solutions against forecast uncertainty by resolution of uncertainty in trees.

  10. Investigation of flood pattern using ANOVA statistic and remote sensing in Malaysia

    International Nuclear Information System (INIS)

    Ya'acob, Norsuzila; Ismail, Nor Syazwani; Mustafa, Norfazira; Yusof, Azita Laily

    2014-01-01

    Flood is an overflow or inundation that comes from river or other body of water and causes or threatens damages. In Malaysia, there are no formal categorization of flood but often broadly categorized as monsoonal, flash or tidal floods. This project will be focus on flood causes by monsoon. For the last few years, the number of extreme flood was occurred and brings great economic impact. The extreme weather pattern is the main sector contributes for this phenomenon. In 2010, several districts in the states of Kedah neighbour-hoods state have been hit by floods and it is caused by tremendous weather pattern. During this tragedy, the ratio of the rainfalls volume was not fixed for every region, and the flood happened when the amount of water increase rapidly and start to overflow. This is the main objective why this project has been carried out, and the analysis data has been done from August until October in 2010. The investigation was done to find the possibility correlation pattern parameters related to the flood. ANOVA statistic was used to calculate the percentage of parameters was involved and Regression and correlation calculate the strength of coefficient among parameters related to the flood while remote sensing image was used for validation between the calculation accuracy. According to the results, the prediction is successful as the coefficient of relation in flood event is 0.912 and proved by Terra-SAR image on 4th November 2010. The rates of change in weather pattern give the impact to the flood

  11. Household flood risk reduction in the Czech Republic

    Czech Academy of Sciences Publication Activity Database

    Duží, Barbora; Vikhrov, Dmytro; Kelman, I.; Stojanov, Robert; Jakubínský, Jiří

    2015-01-01

    Roč. 18, č. 8 (2015), s. 1-6 ISSN 1381-2386 R&D Projects: GA MŠk(CZ) EE2.4.31.0056; GA MŠk(CZ) LD13032; GA MŠk(CZ) LD13033 Institutional support: RVO:67179843 Keywords : Bečva River Basin * Czech Republic * flood risk reduction * floods * household adaptation * household coping Subject RIV: AO - Sociology, Demography Impact factor: 3.085, year: 2015

  12. Hydrochemical aspects of the Aue pit flooding

    International Nuclear Information System (INIS)

    Meyer, J.; Jenk, U.; Schuppan, W.; Knappik, R.

    1998-01-01

    WISMUT is conducting controlled flooding of underground mines at the Schlema-Alberoda and Poehla sites. Flooding of the Poehla mine lasted from January 1992 through September 1995. Flooding at the Niederschlema-Alberoda site began in July 1990 and will continue to approximately 2002. In mid-1998 the flood level had reached the - 420 m level which is about 1,400 m above the lowest mine level. Only ground waters with low mineral and pollutant content are used for flooding purposes. Typically, the flooding process results in elevated levels of mineral salts and of uranium, radium, arsenic, iron, and manganese in flooding waters. However, the mobilised part of these contaminants represents only a small fraction of potential concentrations contained in the surrounding rock. Geochemical and hydrochemical conditions at both mines are characterised by the presence of carbonate buffers and by neutral pH and intermediate to low Eh. Decrease due to oxidation of sulphides in the long term is unlikely. Environmentally relevant metals in flooding waters may be dissolved, colloidal, or suspended solids with uranium present as uranyl carbonate complexes. Intensity of mobilisation is primarily a function of kinetic processes. Post flooding conditions at the Poehla subsite exhibit specific hydrochemical phenomena such as extremely reduced SO 4 concentrations and an increase in Ra concentrations over time. Continued flood monitoring will provide the basis for more in-depth interpretation and prognosis of contaminant mobilisation. Current investigations focus on technically feasible in situ control of mine flooding at the Schlema-Alberoda site to reduce contaminant mobilisation. At both sites water treatment plants are either on stream or under construction. (orig.)

  13. Increasing resilience through participative flood risk map design

    Science.gov (United States)

    Fuchs, Sven; Spira, Yvonne; Stickler, Therese

    2013-04-01

    consultation on the management plans that allows stakeholders to discuss relevant issues and to contribute to arguments and propositions put forward by the stakeholders. Through a wider stakeholder participation and more effective communication, awareness of flood risks should be raised. With the term participation diverse voluntary and informal forms of inclusion are summarized (in contrast to legal forms of participation like the status as a party). When discussing the theoretical and practical implications of participation in flood risk management, it is important to make a clear distinction between public and stakeholder participation. The broad public is "everybody" and refers to the participation by non-organised individuals as members of the general public, and specifically to individuals whose profession is not connected to flood risk management. As such, they have to be regarded as lay persons, which, nevertheless, does not mean that these individuals do not have any idea about the hazard they are exposed to or can contribute to the quality of an decision making process. In contrast to professionally interested parties, this group is typically comprised of individuals with different individual perspectives on flood risk management. It is argued that including practical knowledge and perceptions (reflecting values and preferences) into the flood risk management process is - apart from professional assessments (as systematic knowledge) - a milestone towards adequate governance structures in any institutional process with political legitimacy. Neither normative concepts like sustainable development or "Good Governance" nor the European Water Framework Directive 2000/60/EC do specify what public participation or the participation of user means in detail. As also scientific literature offers no consistent definition of public participation and stakeholder participation we developed an innovative approach used in the pilot project Krems, Austria. The most innovative step

  14. An approach to optimize economics in a west Texas CO2 flood

    International Nuclear Information System (INIS)

    Pariani, G.J.; McColloch, K.A.; Warden, S.L.; Edens, D.R.

    1992-01-01

    Enhanced oil recovery projects, most notably CO 2 floods, are the next generation of recovery methods in the more mature West Texas waterfloods. The cost of installing and operating a CO 2 flood can be extremely high. In this paper, the authors will discuss the methods the authors used to make several active CO 2 floods more profitable by reducing operating costs and deferring investments. This paper reports that the author's goals in studying several active West Texas CO 2 floods were to determine the optimum near term cash flow, overall project economics (rate of return, present worth etc.) and oil recoveries. Using a reservoir simulator, various CO 2 flood designs were developed by altering specific operating parameters including the half-cycle slug size, gas-water ratio (GWR) injection schemes and total CO 2 slug sizes. The resulting injection and production rates were then entered into an economic simulator to determine the most economic set of operating conditions

  15. PMF (probable maximum flood) study for Nevada Nuclear Waste Storage Investigation Project

    International Nuclear Information System (INIS)

    Bullard, K.L.

    1986-01-01

    This document estimates the risk of flooding in the high-level radioactive waste depository proposed for the Yucca Mountain of Nevada. Described are the general features of the proposed site, the drainage pattern of the surrounding area, the historical pattern of precipitation, and an estimate of future precipitation trends. Information from this report will be used in decisions on flood protection construction at this facility. 10 refs., 61 figs., 42 tabs

  16. Extreme flood events in the Bolivian Amazon wetlands

    Directory of Open Access Journals (Sweden)

    A. Ovando

    2016-03-01

    Full Text Available Study region: The Amazonian wetlands of Bolivia, known as the Llanos de Moxos, are believed to play a crucial role in regulating the upper Madeira hydrological cycle, the most important southern tributary of the Amazon River. Because the area is vast and sparsely populated, the hydrological functioning of the wetlands is poorly known. Study focus: We analyzed the hydrometeorological configurations that led to the major floods of 2007, 2008 and 2014. These data, together with flood mapping derived from remote sensing images, were used to understand the dynamics of the Llanos during the three flood events. New hydrological insights for the region: The results showed that large floods are the result of the superimposition of flood waves from major sub-basins of the region. As a previous study suggested, the dynamics of the floods are controlled by an exogenous process, created by the flood wave originating in the Andes piedmont that travels through the Mamoré River; and by an endogenous process, which is the runoff originating in the Llanos. Our study showed that the first process is evident only at the initial phase of the floods, and although important for attenuating the rising flood wave, it is of lesser importance compared to the endogenous process. We conclude that the endogenous process controls the magnitude and duration of major floods. Keywords: Flood dynamics, Wetlands, Remote sensing, Llanos de Moxos

  17. Effect of spatial adaptation measures on flood risk: study of coastal floods in Belgium

    NARCIS (Netherlands)

    Koks, E.E.; de Moel, H.; Aerts, J.C.J.H.; Bouwer, L.M.

    2014-01-01

    Flood risk in coastal zones is projected to increase due to climate change and socioeconomic changes. Over the last decades, population growth, increases in wealth, and urban expansion have been found to be the main causes for increasing losses in coastal areas. These changes may, however, be offset

  18. An assessment of flood vulnerability on physical development along ...

    African Journals Online (AJOL)

    Mohammad

    Key words: Drainage channel, flood, risk assessment, vulnerability. INTRODUCTION ... hydraulic and other control structures.” The effects of floods are always ..... An application of Geographic Information System in mapping flood risk zones in ...

  19. Looking for the best flash floods indicators in Mediterranean Region

    Science.gov (United States)

    Llasat, Maria-Carmen; Llasat-Botija, Montserrat; Turco, Marco

    2010-05-01

    Flash floods are a recurrent hazard in Mediterranean Region. From a global point of view, a distinction between two kinds of floods can be made (Llasat, 2009): a) Short-lived and strongly convective events (cases recorded between 2005 and 2006. This sample has been increased with some selected cases of the European project HYDRATE. Information from all the flash-floods recorded in Catalonia (Spain) since 1982, completed with data about population density and so on, has also been considered.

  20. Flash floods in Europe: state of the art and research perspectives

    Science.gov (United States)

    Gaume, Eric

    2014-05-01

    Flash floods, i.e. floods induced by severe rainfall events generally affecting watersheds of limited area, are the most frequent, destructive and deadly kind of natural hazard known in Europe and throughout the world. Flash floods are especially intense across the Mediterranean zone, where rainfall accumulations exceeding 500 mm within a few hours may be observed. Despite this state of facts, the study of extremes in hydrology has essentially gone unexplored until the recent past, with the exception of some rare factual reports on individual flood events, with the sporadic inclusion of isolated estimated peak discharges. Floods of extraordinary magnitude are in fact hardly ever captured by existing standard measurement networks, either because they are too heavily concentrated in space and time or because their discharges greatly exceed the design and calibration ranges of the measurement devices employed (stream gauges). This situation has gradually evolved over the last decade for two main reasons. First, the expansion and densification of weather radar networks, combined with improved radar quantitative precipitation estimates, now provide ready access to rainfall measurements at spatial and temporal scales that, while not perfectly accurate, are compatible with the study of extreme events. Heavy rainfall events no longer fail to be recorded by existing rain gauge and radar networks. Second, pioneering research efforts on extreme floods, based on precise post-flood surveys, have helped overcome the limitations imposed by a small base of available direct measured data. This activity has already yielded significant progress in expanding the knowledge and understanding of extreme flash floods. This presentation will provide a review of the recent research progresses in the area of flash flood studies, mainly based on the outcomes of the European research projects FLOODsite, HYDRATE and Hymex. It will show how intensive collation of field data helped better define

  1. All projects related to | Page 239 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Topic: FLOOD CONTROL, IRRIGATION SYSTEMS, AGRICULTURAL PRODUCTIVITY, GENDER ROLES, ENVIRONMENTAL POLICY. Region: Pakistan, Central Asia, Far East Asia, South Asia. Program: Climate Change. Total Funding: CA$ 0.00. Climate Change Adaptation, Water, and Food Security in Pakistan. Project.

  2. Study on Public Flood Risk Cognition and Behavioral Response Based on IEC Strategy

    Science.gov (United States)

    Shen, Xin; Xu, Xiaofeng; Zhou, Guilin; Pan, Shaolin; Mi, Tengfei

    2017-11-01

    In order to disseminate knowledge and information on flood risks in flood-prone areas, raise public awareness of flood risks and reduce possible damage to the public, a questionnaire survey was coducted among 260 residents of nine selected communities in Jiaozhou City to learn the public awareness and behavioral response to flood risks at different early warning levels. IEC key information of flood risk awareness was modified and formulated through group discussions, in-depth individual interviews and on-site observation. The awareness of residents in the project area was enhanced through the public participation, environmental management and flood management training, which plays a very important role in reducing flood losses.

  3. Climate change impacts on urban wildfire and flooding policy in Idaho: a comparative policy network perspective

    Science.gov (United States)

    Lindquist, E.; Pierce, J. L.

    2013-12-01

    Numerous frameworks and models exist for understanding the dynamics of the public policy process. A policy network approach considers how and why stakeholders and interests pay attention to and engage in policy problems, such as flood control or developing resilient and fire resistant landscapes. Variables considered in this approach include what the relationships are between these stakeholders, how they influence the process and outcomes, communication patterns within and between policy networks, and how networks change as a result of new information, science, or public interest and involvement with the problem. This approach is useful in understanding the creation of natural hazards policy as new information or situations, such as projected climate change impacts, influence and disrupt the policy process and networks. Two significant natural hazard policy networks exist in the semi-arid Treasure Valley region of Southwest Idaho, which includes the capitol city of Boise and the surrounding metropolitan area. Boise is situated along the Boise River and adjacent to steep foothills; this physiographic setting makes Boise vulnerable to both wildfires at the wildland-urban interface (WUI) and flooding. Both of these natural hazards have devastated the community in the past and floods and fires are projected to occur with more frequency in the future as a result of projected climate change impacts in the region. While both hazards are fairly well defined problems, there are stark differences lending themselves to comparisons across their respective networks. The WUI wildfire network is large and well developed, includes stakeholders from all levels of government, the private sector and property owner organizations, has well defined objectives, and conducts promotional and educational activities as part of its interaction with the public in order to increase awareness and garner support for its policies. The flood control policy network, however, is less defined

  4. Frequent floods in the European Alps coincide with cooler periods of the past 2500 years.

    Science.gov (United States)

    Glur, Lukas; Wirth, Stefanie B; Büntgen, Ulf; Gilli, Adrian; Haug, Gerald H; Schär, Christoph; Beer, Jürg; Anselmetti, Flavio S

    2013-09-26

    Severe floods triggered by intense precipitation are among the most destructive natural hazards in Alpine environments, frequently causing large financial and societal damage. Potential enhanced flood occurrence due to global climate change would thus increase threat to settlements, infrastructure, and human lives in the affected regions. Yet, projections of intense precipitation exhibit major uncertainties and robust reconstructions of Alpine floods are limited to the instrumental and historical period. Here we present a 2500-year long flood reconstruction for the European Alps, based on dated sedimentary flood deposits from ten lakes in Switzerland. We show that periods with high flood frequency coincide with cool summer temperatures. This wet-cold synchronism suggests enhanced flood occurrence to be triggered by latitudinal shifts of Atlantic and Mediterranean storm tracks. This paleoclimatic perspective reveals natural analogues for varying climate conditions, and thus can contribute to a better understanding and improved projections of weather extremes under climate change.

  5. Influence of climate change on flood magnitude and seasonality in the Arga River catchment in Spain

    Science.gov (United States)

    Garijo, Carlos; Mediero, Luis

    2018-04-01

    Climate change projections suggest that extremes, such as floods, will modify their behaviour in the future. Detailed catchment-scale studies are needed to implement the European Union Floods Directive and give recommendations for flood management and design of hydraulic infrastructure. In this study, a methodology to quantify changes in future flood magnitude and seasonality due to climate change at a catchment scale is proposed. Projections of 24 global climate models are used, with 10 being downscaled by the Spanish Meteorological Agency (Agencia Estatal de Meteorología, AEMET) and 14 from the EURO-CORDEX project, under two representative concentration pathways (RCPs) 4.5 and 8.5, from the Fifth Assessment Report provided by the Intergovernmental Panel on Climate Change. Downscaled climate models provided by the AEMET were corrected in terms of bias. The HBV rainfall-runoff model was selected to simulate the catchment hydrological behaviour. Simulations were analysed through both annual maximum and peaks-over-threshold (POT) series. The results show a decrease in the magnitude of extreme floods for the climate model projections downscaled by the AEMET. However, results for the climate model projections downscaled by EURO-CORDEX show differing trends, depending on the RCP. A small decrease in the flood magnitude was noticed for the RCP 4.5, while an increase was found for the RCP 8.5. Regarding the monthly seasonality analysis performed by using the POT series, a delay in the flood timing from late-autumn to late-winter is identified supporting the findings of recent studies performed with observed data in recent decades.

  6. Beyond the Floodplain: Drivers of Flood Risk in Coastal Cities

    Science.gov (United States)

    Rosenzweig, B.; McPhearson, T.; Rosi, E. J.

    2017-12-01

    While the catastrophic impacts of Hurricane Katrina increased awareness of coastal flood risk, conventional approaches to flood risk assessment do not adequately represent the drivers of flood risk in the unique, highly engineered landscape of dense cities. We review the recent (1996-2016) history of flooding events and current regional climate change projection for 4 diverse coastal cities in the United States: San Juan, Miami, Baltimore and New York. Our review suggests that while all 4 of these cities face increased risk from direct coastal flooding with climate change, pluvial flooding will be an additional, important driver of risk that is currently poorly quantified. Unlike other types of flooding, pluvial flood risk is not limited to a contiguous riverine or coastal floodplain, but is instead driven by interactions between spatially variable geophysical drivers (intense rainfall, shallow groundwater, and influent tidal water), social drivers (patterns of land use) and technical drivers (urban stormwater and coastal infrastructure). We discuss approaches for quantitative assessment of pluvial flood risk, the challenges presented by the lack of data on geophysical flooding drivers in dense cities, and opportunities for integrated research to provide the scientific information needed by practitioners.

  7. Forecast-based Integrated Flood Detection System for Emergency Response and Disaster Risk Reduction (Flood-FINDER)

    Science.gov (United States)

    Arcorace, Mauro; Silvestro, Francesco; Rudari, Roberto; Boni, Giorgio; Dell'Oro, Luca; Bjorgo, Einar

    2016-04-01

    image processing. Flood-FINDER aims to pre-empt this process and to provide preliminary analyses where no field data is available. In the early 2015, the Flood-FINDER's forecast along the Shire River has been used to guide the rapid mapping activities in Southern Malawi and Northern Mozambique. It proved efficient support providing timely information about the evolution of the flood event over an area lacking of field data. Regarding in-country capacity building, Flood-FINDER allowed UNOSAT to set up in middle 2015 a flood early warning system in Chad along the Chari River basin with the collaboration of Chadian Ministry of hydraulics and livestock. Weekly flood bulletins have been shared with local authorities and UN agencies over the entire rainy season. Finally, an experimental version of the global web alerting platform has been recently developed for supporting the El Nino flood preparedness in the Horn of Africa. Flood-FINDEŔs mission is to support decision makers throughout all the disaster management cycle with flood alerts, modelled scenarios, EO-based impact assessments and with direct support at country level to implement disaster mitigation strategies. The aim for the future is to seek funding for having the global system fully operational using CERN's supercomputing facilities and to establish new in-country projects with local authorities.

  8. Impact of stream restoration on flood waves

    Science.gov (United States)

    Sholtes, J.; Doyle, M.

    2008-12-01

    Restoration of channelized or incised streams has the potential to reduce downstream flooding via storing and dissipating the energy of flood waves. Restoration design elements such as restoring meanders, reducing slope, restoring floodplain connectivity, re-introducing in-channel woody debris, and re-vegetating banks and the floodplain have the capacity to attenuate flood waves via energy dissipation and channel and floodplain storage. Flood discharge hydrographs measured up and downstream of several restored reaches of varying stream order and located in both urban and rural catchments are coupled with direct measurements of stream roughness at various stages to directly measure changes to peak discharge, flood wave celerity, and dispersion. A one-dimensional unsteady flow routing model, HEC-RAS, is calibrated and used to compare attenuation characteristics between pre and post restoration conditions. Modeled sensitivity results indicate that a restoration project placed on a smaller order stream demonstrates the highest relative reduction in peak discharge of routed flood waves compared to one of equal length on a higher order stream. Reductions in bed slope, extensions in channel length, and increases in channel and floodplain roughness follow restoration placement with the watershed in relative importance. By better understanding how design, scale, and location of restored reaches within a catchment hydraulically impact flood flows, this study contributes both to restoration design and site decision making. It also quantifies the effect of reach scale stream restoration on flood wave attenuation.

  9. TWO-DIMENSIONAL MODELLING OF ACCIDENTAL FLOOD WAVES PROPAGATION

    Directory of Open Access Journals (Sweden)

    Lorand Catalin STOENESCU

    2011-05-01

    Full Text Available The study presented in this article describes a modern modeling methodology of the propagation of accidental flood waves in case a dam break; this methodology is applied in Romania for the first time for the pilot project „Breaking scenarios of Poiana Uzului dam”. The calculation programs used help us obtain a bidimensional calculation (2D of the propagation of flood waves, taking into consideration the diminishing of the flood wave on a normal direction to the main direction; this diminishing of the flood wave is important in the case of sinuous courses of water or with urban settlements very close to the minor river bed. In the case of Poiana Uzului dam, 2 scenarios were simulated with the help of Ph.D. Eng. Dan Stematiu, plausible scenarios but with very little chances of actually producing. The results were presented as animations with flooded surfaces at certain time steps successively.

  10. Simulating floods : On the application of a 2D-hydraulic model for flood hazard and risk assessment

    NARCIS (Netherlands)

    Alkema, D.

    2007-01-01

    Over the last decades, river floods in Europe seem to occur more frequently and are causing more and more economic and emotional damage. Understanding the processes causing flooding and the development of simulation models to evaluate countermeasures to control that damage are important issues. This

  11. Damage-reducing measures to manage flood risks in a changing climate

    Science.gov (United States)

    Kreibich, Heidi; Bubeck, Philip; Van Vliet, Mathijs; De Moel, Hans

    2014-05-01

    Damage due to floods has increased during the last few decades, and further increases are expected in several regions due to climate change and a growing vulnerability. To address the projected increase in flood risk, a combination of structural and non-structural flood risk mitigation measures is considered as a promising adaptation strategy. Such a combination takes into account that flood defence systems may fail, and prepare for unexpected crisis situations via land-use planning, building construction, evacuation and disaster response. Non-structural flood risk mitigation measures like shielding with water shutters or sand bags, building fortification or safeguarding of hazardous substances are often voluntary: they demand self-dependent action by the population at risk (Bubeck et al. 2012; 2013). It is believed that these measures are especially effective in areas with frequent flood events and low flood water levels, but some types of measures showed a significant damage-reducing effect also during extreme flood events, such as the Elbe River flood in August 2002 in Germany (Kreibich et al. 2005; 2011). Despite the growing importance of damage-reducing measures, information is still scarce about factors that motivate people to undertake such measures, the state of implementation of various non-structural measures in different countries and their damage reducing effects. Thus, we collected information and undertook an international review about this topic in the framework of the Dutch KfC project "Climate proof flood risk management". The contribution will present an overview about the available information on damage-reducing measures and draw conclusions for practical flood risk management in a changing climate. References: Bubeck, P., Botzen, W. J. W., Suu, L. T. T., Aerts, J. C. J. H. (2012): Do flood risk perceptions provide useful insights for flood risk management? Findings from central Vietnam. Journal of Flood Risk Management, 5, 4, 295-302 Bubeck, P

  12. Fluvial geomorphology and suspended-sediment transport during construction of the Roanoke River Flood Reduction Project in Roanoke, Virginia, 2005–2012

    Science.gov (United States)

    Jastram, John D.; Krstolic, Jennifer L.; Moyer, Douglas; Hyer, Kenneth

    2015-09-30

    Beginning in 2005, after decades of planning, the U.S. Army Corps of Engineers (USACE) undertook a major construction effort to reduce the effects of flooding on the city of Roanoke, Virginia—the Roanoke River Flood Reduction Project (RRFRP). Prompted by concerns about the potential for RRFRP construction-induced geomorphological instability and sediment liberation and the detrimental effects these responses could have on the endangered Roanoke logperch (Percina rex), the U.S. Geological Survey (USGS) partnered with the USACE to provide a real-time warning network and a long-term monitoring program to evaluate geomorphological change and sediment transport in the affected river reach. Geomorphological change and suspended-sediment transport are highly interdependent and cumulatively provide a detailed understanding of the sedimentary response, or lack thereof, of the Roanoke River to construction of the RRFRP.

  13. A Multimethod Approach towards Assessing Urban Flood Patterns and Its Associated Vulnerabilities in Singapore

    OpenAIRE

    Winston T. L. Chow; Brendan D. Cheong; Beatrice H. Ho

    2016-01-01

    We investigated flooding patterns in the urbanised city-state of Singapore through a multimethod approach combining station precipitation data with archival newspaper and governmental records; changes in flash floods frequencies or reported impacts of floods towards Singapore society were documented. We subsequently discussed potential flooding impacts in the context of urban vulnerability, based on future urbanisation and forecasted precipitation projections for Singapore. We find that, desp...

  14. Assessing coastal flood risk and sea level rise impacts at New York City area airports

    Science.gov (United States)

    Ohman, K. A.; Kimball, N.; Osler, M.; Eberbach, S.

    2014-12-01

    Flood risk and sea level rise impacts were assessed for the Port Authority of New York and New Jersey (PANYNJ) at four airports in the New York City area. These airports included John F. Kennedy International, LaGuardia, Newark International, and Teterboro Airports. Quantifying both present day and future flood risk due to climate change and developing flood mitigation alternatives is crucial for the continued operation of these airports. During Hurricane Sandy in October 2012 all four airports were forced to shut down, in part due to coastal flooding. Future climate change and sea level rise effects may result in more frequent shutdowns and disruptions in travel to and from these busy airports. The study examined the effects of the 1%-annual-chance coastal flooding event for present day existing conditions and six different sea level rise scenarios at each airport. Storm surge model outputs from the Federal Emergency Management Agency (FEMA) provided the present day storm surge conditions. 50th and 90thpercentile sea level rise projections from the New York Panel on Climate Change (NPCC) 2013 report were incorporated into storm surge results using linear superposition methods. These projections were evaluated for future years 2025, 2035, and 2055. In addition to the linear superposition approach for storm surge at airports where waves are a potential hazard, one dimensional wave modeling was performed to get the total water level results. Flood hazard and flood depth maps were created based on these results. In addition to assessing overall flooding at each airport, major at-risk infrastructure critical to the continued operation of the airport was identified and a detailed flood vulnerability assessment was performed. This assessment quantified flood impacts in terms of potential critical infrastructure inundation and developed mitigation alternatives to adapt to coastal flooding and future sea level changes. Results from this project are advancing the PANYNJ

  15. Misible flooding: how far have we come and where are we going

    Energy Technology Data Exchange (ETDEWEB)

    Roessingh, H K

    1968-06-01

    The 2 most important criteria of the effectiveness of a secondary recovery project are sweep efficiency and unit displacement. Waterfloods have a poor unit displacement. Gas and LPG slugs have poor mobility control and, therefore, poor sweep efficiency. In both processes the irreducible oil saturation is too high. Newer methods designed to improve the performance and now being used extensively include the addition of polymer solutions to waterfloods to control mobility; in situ combustion and stream injection for viscous crudes; miscible processes; and surfactant flooding to reduce interfacial tension. These processes have made tremendous contributions to the increase in recoverable reserves in North America. Still, miscible flooding of some type seemed the most likely manner in which to recover all or nearly all of the oil in a reservoir, and research into more economic methods has continued. The most recent development has come from the research department of Marathon Oil Co. The process has been named Maraflood. (16 refs.)

  16. Extreme Mississippi River Floods in the Late Holocene: Reconstructions and Simulations

    Science.gov (United States)

    Munoz, S. E.; Giosan, L.; Donnelly, J. P.; Dee, S.

    2016-12-01

    Extreme flooding of the Mississippi River is costly in both economic and social terms. Despite ambitious engineering projects conceived in the early 20th century to mitigate damage from extreme floods, economic losses due to flooding have increased over recent years. Forecasting extreme flood occurrence over seasonal or longer time-scales remains a major challenge - especially in light of shifts in hydroclimatic conditions expected in response to continued greenhouse forcing. Here, we present findings from a series of paleoflood records that span the late Holocene derived from laminated sediments deposited in abandoned channels of the Mississippi River. These sedimentary archives record individual overbank floods as unique events beds with upward fining that we identify using grain-size analysis, bulk geochemistry, and radiography. We use sedimentological characteristics to reconstruct flood magnitude by calibrating our records against instrumental streamflow data from nearby gauging stations. We also use the Last Millennium Experiments of the Community Earth System Model (CESM-LME) and historical reanalysis data to examine the state of climate system around river discharge extremes. Our paleo-flood records exhibit strong non-stationarities in flood frequency and magnitude that are associated with fluctuations in the frequency of the El Niño-Southern Oscillation (ENSO), because the warm ENSO phase is associated with increased surface water storage of the lower Mississippi basin that leads to enhanced runoff delivery to the main channel. We also show that the early 20th century was a period of anomalously high flood frequency and magnitude due to the combined effects of river engineering and natural climate variability. Our findings imply that flood risk along the lower Mississippi River is tightly coupled to the frequency of ENSO, highlighting the need for robust projections of ENSO variability under greenhouse warming.

  17. Flood and Weather Monitoring Using Real-time Twitter Data Streams

    Science.gov (United States)

    Demir, I.; Sit, M. A.; Sermet, M. Y.

    2016-12-01

    Social media data is a widely used source to making inference within public crisis periods and events in disaster times. Specifically, since Twitter provides large-scale data publicly in real-time, it is one of the most extensive resources with location information. This abstract provides an overview of a real-time Twitter analysis system to support flood preparedness and response using a comprehensive information-centric flood ontology and natural language processing. Within the scope of this project, we deal with acquisition and processing of real-time Twitter data streams. System fetches the tweets with specified keywords and classifies them as related to flooding or heavy weather conditions. The system uses machine learning algorithms to discover patterns using the correlation between tweets and Iowa Flood Information System's (IFIS) extensive resources. The system uses these patterns to forecast the formation and progress of a potential future flood event. While fetching tweets, predefined hashtags are used for filtering and enhancing the relevancy for selected tweets. With this project, tweets can also be used as an alternative data source where other data sources are not sufficient for specific tasks. During the disasters, the photos that people upload alongside their tweets can be collected and placed to appropriate locations on a mapping system. This allows decision making authorities and communities to see the most recent outlook of the disaster interactively. In case of an emergency, concentration of tweets can help the authorities to determine a strategy on how to reach people most efficiently while providing them the supplies they need. Thanks to the extendable nature of the flood ontology and framework, results from this project will be a guide for other natural disasters, and will be shared with the community.

  18. Development of flood index by characterisation of flood hydrographs

    Science.gov (United States)

    Bhattacharya, Biswa; Suman, Asadusjjaman

    2015-04-01

    In recent years the world has experienced deaths, large-scale displacement of people, billions of Euros of economic damage, mental stress and ecosystem impacts due to flooding. Global changes (climate change, population and economic growth, and urbanisation) are exacerbating the severity of flooding. The 2010 floods in Pakistan and the 2011 floods in Australia and Thailand demonstrate the need for concerted action in the face of global societal and environmental changes to strengthen resilience against flooding. Due to climatological characteristics there are catchments where flood forecasting may have a relatively limited role and flood event management may have to be trusted upon. For example, in flash flood catchments, which often may be tiny and un-gauged, flood event management often depends on approximate prediction tools such as flash flood guidance (FFG). There are catchments fed largely by flood waters coming from upstream catchments, which are un-gauged or due to data sharing issues in transboundary catchments the flow of information from upstream catchment is limited. Hydrological and hydraulic modelling of these downstream catchments will never be sufficient to provide any required forecasting lead time and alternative tools to support flood event management will be required. In FFG, or similar approaches, the primary motif is to provide guidance by synthesising the historical data. We follow a similar approach to characterise past flood hydrographs to determine a flood index (FI), which varies in space and time with flood magnitude and its propagation. By studying the variation of the index the pockets of high flood risk, requiring attention, can be earmarked beforehand. This approach can be very useful in flood risk management of catchments where information about hydro-meteorological variables is inadequate for any forecasting system. This paper presents the development of FI and its application to several catchments including in Kentucky in the USA

  19. Evaluation of extensive floods in western/central Europe

    Czech Academy of Sciences Publication Activity Database

    Gvoždíková, B.; Müller, Miloslav

    2017-01-01

    Roč. 21, č. 7 (2017), s. 3715-3725 ISSN 1027-5606 R&D Projects: GA ČR GA17-23773S Institutional support: RVO:68378289 Keywords : June 2013 flood * extreme floods * river-basin * climate * events * precipitation * Germany * Britain * example * model Subject RIV: DG - Athmosphere Sci ences, Meteorology OBOR OECD: Hydrology Impact factor: 4.437, year: 2016 https://www.hydrol-earth-syst- sci .net/21/3715/2017/hess-21-3715-2017.pdf

  20. Two-dimensional Model of Ciliwung River Flood in DKI Jakarta for Development of the Regional Flood Index Map

    Directory of Open Access Journals (Sweden)

    Adam Formánek

    2013-12-01

    Full Text Available The objective of this study was to present a sophisticated method of developing supporting material for flood control implementation in DKI Jakarta. High flow rates in the Ciliwung River flowing through Jakarta regularly causes extensive flooding in the rainy season. The affected area comprises highly densely populated villages. For developing an efficient early warning system in view of decreasing the vulnerability of the locations a flood index map has to be available. This study analyses the development of a flood risk map of the inundation area based on a two-dimensional modeling using FESWMS. The reference event used for the model was the most recent significant flood in 2007. The resulting solution represents flood characteristics such as inundation area, inundation depth and flow velocity. Model verification was performed by confrontation of the results with survey data. The model solution was overlaid with a street map of Jakarta. Finally, alternatives for flood mitigation measures are discussed.

  1. A complete CFD tool for flooding forecasting

    International Nuclear Information System (INIS)

    Nguyen, V.T.; Eberl, H.

    2004-01-01

    Every year, flooding does not only cause property damage of billions of dollars, but also threats to millions of human life around the world. The ability to accurately predict the extreme flooding in urban areas is of obvious importance in order to reduce flooding risks and to improve public safety. In this paper, a complete computational tool is presented that includes pre-processing, meshing, calculating and post-processing modules. The pre-processing procedure is used to interpolate the geometry of the river and floodplains where the data can not be obtained directly from measurements. The meshing procedure is implemented by a triangle mesh generator. The computational procedure is based on a Finite Element Method to discretize the two-dimensional depth-averaged equations for shallow water flow. The post-processing procedure, finally, is interfaced with Geographic Information Systems (GIS), which can serve as a tool for monitoring and as an early warning system. The numerical model is verified and calibrated through many practical projects of flood protection for rivers in Germany. The numerical results show a very good agreement with data from the field survey, as well as data from past flood events. Thus the numerical model can be used as an important tool for flood prediction. (author)

  2. System of prediction and warning of floods in the water basin of Struma/ Strymonas River

    International Nuclear Information System (INIS)

    Mimides, Theologos; Rizos, Spyros; Soulis, Kostas; Dimitrov, Dobri

    2004-01-01

    Struma is collecting waters from four countries: Bulgaria, Serbia, FYROM and Greece. Most of its basin area is located in Bulgaria and Greece, while the upper part of its basin is in Bulgaria. There are important hydro technical structures just below the Bulgarian-Greek border, and the floods generated in the Bulgarian part of the basin could significantly affect the security of those structures and their operational rules. That is why several years ago a project related to flood warning at Struma/ Strymonas river basin was formulated and its first phase was completed in 2000. The main objective of the project was to demonstrate the principal possibility for issuing reliable warnings for hazardous flood events with sufficient lead-time to organize flood mitigation measures. The project implementation team included various scientists from the Agricultural University of Athens-Greece (leader), from the Center of Remote Sensing, Bristol University-UK, and from the National Institute of Meteorology and Hydrology of Sofia - Bulgaria. The work program of the first project phase included a range of activities implemented by the Bulgarian and Greek team members, coordinated by the Agricultural University of Athens. Among the activities of the Project are included: a) a preliminary model for peak flood hydrographs and specifications of an early warning system, b) a real time flood forecasting by routing flood hydrographs through the system of the river and Kerkini lake, c) thematic maps of vegetation and land cover derived by satellite remote sensing, d) satellite snow monitoring in the basin, e) an adaptation of the Alladin Weather Forecast Model at the hydrological basin and scaling of the Crocus Snow Model at a preliminary stage, and f) development of a geo environmental recording system.(Author)

  3. SESAME: Exploring small businesses’ behaviour to enhance resilience to flooding

    Directory of Open Access Journals (Sweden)

    Coates Graham

    2016-01-01

    Full Text Available In the United Kingdom, small and medium sized enterprises (SMEs account for approximately 99.9% of businesses, 60% of the working population and 47% annual turnover. However, despite the important contribution that SMEs make to the economy, this size of business remains under-researched with a significant gap in understanding how the disruption caused by flooding impacts on SMEs from the time at which a flood event occurs through to the ‘return’ to normal operations. Business continuity management is a recognised approach for enhancing organisational resilience to major disruptions (ISO 22301, 2012. However, this strategic approach to building such resilience in SMEs is under-explored in the literature with a limited range of empirical data to draw on. This paper presents an overview of an inter-disciplinary research project funded by the UK’s Engineering and Physical Science Research Council, called SESAME, which examines SMEs’ operational response and preparedness to flooding. Furthermore, SESAME consists of four stands of research which bring together a number of disciplines including agent based modelling and simulation, flood modelling, business continuity management, economic modelling and behavioural science. This paper provides an overview of the different research stands within the SESAME project aimed at enhancing SMEs’ resilience to flooding.

  4. Flood Risk Assessment Based On Security Deficit Analysis

    Science.gov (United States)

    Beck, J.; Metzger, R.; Hingray, B.; Musy, A.

    Risk is a human perception: a given risk may be considered as acceptable or unac- ceptable depending on the group that has to face that risk. Flood risk analysis of- ten estimates economic losses from damages, but neglects the question of accept- able/unacceptable risk. With input from land use managers, politicians and other stakeholders, risk assessment based on security deficit analysis determines objects with unacceptable risk and their degree of security deficit. Such a risk assessment methodology, initially developed by the Swiss federal authorities, is illustrated by its application on a reach of the Alzette River (Luxembourg) in the framework of the IRMA-SPONGE FRHYMAP project. Flood risk assessment always involves a flood hazard analysis, an exposed object vulnerability analysis, and an analysis combing the results of these two previous analyses. The flood hazard analysis was done with the quasi-2D hydraulic model FldPln to produce flood intensity maps. Flood intensity was determined by the water height and velocity. Object data for the vulnerability analysis, provided by the Luxembourg government, were classified according to their potential damage. Potential damage is expressed in terms of direct, human life and secondary losses. A thematic map was produced to show the object classification. Protection goals were then attributed to the object classes. Protection goals are assigned in terms of an acceptable flood intensity for a certain flood frequency. This is where input from land use managers and politicians comes into play. The perception of risk in the re- gion or country influences the protection goal assignment. Protection goals as used in Switzerland were used in this project. Thematic maps showing the protection goals of each object in the case study area for a given flood frequency were produced. Com- parison between an object's protection goal and the intensity of the flood that touched the object determine the acceptability of the risk and the

  5. Sea-Level Rise and Flood Potential along the California Coast

    Science.gov (United States)

    Delepine, Q.; Leung, C.

    2013-12-01

    Sea-level rise is becoming an ever-increasing problem in California. Sea-level is expected to rise significantly in the next 100 years, which will raise flood elevations in coastal communities. This will be an issue for private homeowners, businesses, and the state. One study suggests that Venice Beach could lose a total of at least $440 million in tourism spending and tax dollars from flooding and beach erosion if sea level rises 1.4 m by 2100. In addition, several airports, such as San Francisco International Airport, are located in coastal regions that have flooded in the past and will likely be flooded again in the next 30 years, but sea-level rise is expected to worsen the effects of flooding in the coming decades It is vital for coastal communities to understand the risks associated with sea-level rise so that they can plan to adapt to it. By obtaining accurate LiDAR elevation data from the NOAA Digital Coast Website (http://csc.noaa.gov/dataviewer/?keyword=lidar#), we can create flood maps to simulate sea level rise and flooding. The data are uploaded to ArcGIS and contour lines are added for different elevations that represent future coastlines during 100-year flooding. The following variables are used to create the maps: 1. High-resolution land surface elevation data - obtained from NOAA 2. Local mean high water level - from USGS 3. Local 100-year flood water level - from the Pacific Institute 4. Sea-level rise projections for different future dates (2030, 2050, and 2100) - from the National Research Council The values from the last three categories are added to represent sea-level rise plus 100-year flooding. These values are used to make the contour lines that represent the projected flood elevations, which are then exported as KML files, which can be opened in Google Earth. Once these KML files are made available to the public, coastal communities will gain an improved understanding of how flooding and sea-level rise might affect them in the future

  6. Water mobility key to improved floods

    Energy Technology Data Exchange (ETDEWEB)

    Pamenter, C B

    1967-03-01

    The use of polymer floods in the U.S. and Canada is discussed. A 2-yr laboratory study conducted by Dow Chemical Co. early in the life of polymer flooding showed that polymers improved the mobility ratio without damage to porosity or permeability of reservoir rock. A pilot test was made in the Niagara Field, Ky., and the results of this pilot compared to the performance of a waterflood that had been operating in this field for about 4 yr. The results showed that polymer flooding was superior to conventional waterflooding and had a distinct behavior. Another pilot flood conducted by Dow in the Albrecht Field, Starr County, Tex., showed similar results. Union Oil Co. of California also conducted pilot tests in 4 of their California reservoirs. Additional recoverable reserves resulting from polymer flooding for 2 of these reservoirs were estimated at 95,000 and 70,000 bbl. The other 2 tests were not as satisfactory, but this behavior is thought to be the result of not using enough polymer. Two other projects discussed are the NE. Hallsville Field unit in East Texas and the Squirrel sand reservoir in Woodson County, Kans., which were conducted by Hunt Oil Co. and Brazos Oil and Gas Co., respectively.

  7. Temporal clustering of floods in Germany: Do flood-rich and flood-poor periods exist?

    Science.gov (United States)

    Merz, Bruno; Nguyen, Viet Dung; Vorogushyn, Sergiy

    2016-10-01

    The repeated occurrence of exceptional floods within a few years, such as the Rhine floods in 1993 and 1995 and the Elbe and Danube floods in 2002 and 2013, suggests that floods in Central Europe may be organized in flood-rich and flood-poor periods. This hypothesis is studied by testing the significance of temporal clustering in flood occurrence (peak-over-threshold) time series for 68 catchments across Germany for the period 1932-2005. To assess the robustness of the results, different methods are used: Firstly, the index of dispersion, which quantifies the departure from a homogeneous Poisson process, is investigated. Further, the time-variation of the flood occurrence rate is derived by non-parametric kernel implementation and the significance of clustering is evaluated via parametric and non-parametric tests. Although the methods give consistent overall results, the specific results differ considerably. Hence, we recommend applying different methods when investigating flood clustering. For flood estimation and risk management, it is of relevance to understand whether clustering changes with flood severity and time scale. To this end, clustering is assessed for different thresholds and time scales. It is found that the majority of catchments show temporal clustering at the 5% significance level for low thresholds and time scales of one to a few years. However, clustering decreases substantially with increasing threshold and time scale. We hypothesize that flood clustering in Germany is mainly caused by catchment memory effects along with intra- to inter-annual climate variability, and that decadal climate variability plays a minor role.

  8. European conference on advances in flood research. Vol. 2. Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    Bronstert, A; Bismuth, C; Menzel, L [eds.

    2000-11-01

    Following concern expressed by several Member States in the 1990's, the EC directorate General of Research and Development (DG XII) has initiated and/or funded a variety of activities in order to improve the scientific basis and to intensify knowledge transfer into practice concerning flood forecasting, risk mitigation, and the impact analysis of environmental change effects. After more then half a decade of research in this field, this conference is aimed to present the results achieved and to highlight the scientific advances. Besides the presentations of the EUROTAS-project results, the contributions are grouped into the following sub-sessions: impact of land use and climate on flooding, flood management and assessment of flood risk, catchment modelling and management systems, and impact of river engineering on flooding conditions. (orig.)

  9. European conference on advances in flood research. Vol. 2. Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    Bronstert, A.; Bismuth, C.; Menzel, L. [eds.

    2000-11-01

    Following concern expressed by several Member States in the 1990's, the EC directorate General of Research and Development (DG XII) has initiated and/or funded a variety of activities in order to improve the scientific basis and to intensify knowledge transfer into practice concerning flood forecasting, risk mitigation, and the impact analysis of environmental change effects. After more then half a decade of research in this field, this conference is aimed to present the results achieved and to highlight the scientific advances. Besides the presentations of the EUROTAS-project results, the contributions are grouped into the following sub-sessions: impact of land use and climate on flooding, flood management and assessment of flood risk, catchment modelling and management systems, and impact of river engineering on flooding conditions. (orig.)

  10. European conference on advances in flood research. Vol. 1. Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    Bronstert, A.; Bismuth, C.; Menzel, L. [eds.

    2000-11-01

    Following concern expressed by several Member States in the 1990's, the EC directorate General of Research and Development (DG XII) has initiated and/or funded a variety of activities in order to improve the scientific basis and to intensify knowledge transfer into practice concerning flood forecasting, risk mitigation, and the impact analysis of environmental change effects. After more then half a decade of research in this field, this conference is aimed to present the results achieved and to highlight the scientific advances. Besides the presentations of the EUROTAS-project results, the contributions are grouped into the following sub-sessions: impact of land use and climate on flooding, flood management and assessment of flood risk, catchment modelling and management systems, and impact of river engineering on flooding conditions. (orig.)

  11. European conference on advances in flood research. Vol. 1. Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    Bronstert, A; Bismuth, C; Menzel, L [eds.

    2000-11-01

    Following concern expressed by several Member States in the 1990's, the EC directorate General of Research and Development (DG XII) has initiated and/or funded a variety of activities in order to improve the scientific basis and to intensify knowledge transfer into practice concerning flood forecasting, risk mitigation, and the impact analysis of environmental change effects. After more then half a decade of research in this field, this conference is aimed to present the results achieved and to highlight the scientific advances. Besides the presentations of the EUROTAS-project results, the contributions are grouped into the following sub-sessions: impact of land use and climate on flooding, flood management and assessment of flood risk, catchment modelling and management systems, and impact of river engineering on flooding conditions. (orig.)

  12. Modeling Compound Flood Hazards in Coastal Embayments

    Science.gov (United States)

    Moftakhari, H.; Schubert, J. E.; AghaKouchak, A.; Luke, A.; Matthew, R.; Sanders, B. F.

    2017-12-01

    strengths/weaknesses of each approach and helps modelers choose the appropriate scenario that best fit to the needs of their project. The proposed risk assessment approach can help flood hazard modeling practitioners achieve a more reliable estimate of risk, by cautiously reducing the dimensionality of the hazard analysis.

  13. Carbon degradation in agricultural soils flooded with seawater after managed coastal realignment

    DEFF Research Database (Denmark)

    Sjøgaard, Kamilla Schneekloth; Treusch, Alexander H.; Valdemarsen, Thomas Bruun

    2017-01-01

    Strand) that was planned to be flooded in a coastal realignment project. We found rapid carbon degradation almost immediately after flooding and microbial sulfate reduction rapidly established as the dominant mineralization pathway. Nevertheless, no free sulfide was observed as it precipitated as Fe...

  14. Improving Flood Management Planning in Thailand | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    According to World Bank estimates, this disaster caused US$46.5 billion in ... This project seeks to improve the Flood Management Master Plan, proposing ... New Dutch-Canadian funding for the Climate and Development Knowledge Network.

  15. Geomorphic changes caused by the 2011 flood at selected sites along the lower Missouri River and comparison to historical floods: Chapter H in 2011 floods of the central United States

    Science.gov (United States)

    Juracek, Kyle E.

    2014-01-01

    An analysis of recent and historical U.S. Geological Survey streamgage information was used to assess geomorphic changes caused by the 2011 flood, in comparison to selected historical floods, at three streamgage sites along the lower Missouri River—Sioux City, Iowa; Omaha, Nebraska; and Kansas City, Missouri. Channel-width change was not evident at the three streamgage sites following the 2011 flood and likely was inhibited by bank stabilization. Pronounced changes in channel-bed elevation were indicated. At Sioux City and Omaha, the geomorphic effects of the 2011 flood were similar in terms of the magnitude of channelbed scour and recovery. At both sites, the 2011 flood caused pronounced scour (about 3 feet) of the channel bed; however, at Omaha, most of the channel-bed scour occurred after the flood had receded. More than 1 year after the flood, the channel bed had only partially recovered (about 1 foot) at both sites. Pronounced scour (about 3 feet at Sioux City and about 1.5 feet at Omaha) also was caused by the 1952 flood, which had a substantially larger peak discharge but was much shorter in duration at both sites. Again, at Omaha, most of the channel- bed scour occurred after the flood had receded. At Sioux City, substantial recovery of the channel bed (about 2.5 feet) was documented 1 year after the 1952 flood. Recovery to the pre-flood elevation was complete by April 1954. The greater recovery following the 1952 flood, compared to the 2011 flood, likely was related to a more abundant sediment supply because the flood predated the completion of most of the main-stem dam, channelization, and bank stabilization projects. At Omaha, following the 1952 flood, the channel bed never fully recovered to its pre-flood elevation. The geomorphic effect of the 2011 flood at Kansas City was fill (about 1 foot) on the channel bed followed by relative stability. The 1952 flood, which had a substantially larger peak discharge but was much shorter in duration, caused

  16. Climatic and anthropogenic controls on Mississippi River floods: a multi-proxy palaeoflood approach

    Science.gov (United States)

    Munoz, S. E.; Therrell, M. D.; Remo, J. W.; Giosan, L.; Donnelly, J. P.

    2017-12-01

    Over the last century, many of the world's major rivers have been modified for the purposes of flood mitigation, power generation, and commercial navigation. Engineering modifications to the Mississippi River system have altered the river's sediment budget and channel morphology, but the influence of these modifications on flood risk is debated. Detecting and attributing changes in river discharge is challenging because instrumental streamflow records are often too short to evaluate the range of natural hydrological variability prior to the establishment of flood mitigation infrastructure. Here we show that multi-decadal trends of flood risk on the lower Mississippi River are strongly modulated by dynamical modes of climate variability, particularly the El Niño-Southern Oscillation (ENSO) and the Atlantic Multidecadal Oscillation (AMO), but that artificial channelization has greatly amplified flood magnitudes over the last century. Our results, based on a multi-proxy reconstruction of flood frequency and magnitude spanning the last five hundred years that combines sedimentary, tree-ring, and instrumental records, reveal that the magnitude of the 100-year flood has increased by 20% over the period of record, with 75% of this increase attributed to river engineering. We conclude that the interaction of human alterations to the Mississippi River system with dynamical modes of climate variability has elevated the current flood risk to levels that are unprecedented within the last five centuries.

  17. Spatial Scaling of Global Rainfall and Flood Extremes

    Science.gov (United States)

    Devineni, Naresh; Lall, Upmanu; Xi, Chen; Ward, Philip

    2014-05-01

    Floods associated with severe storms are a significant source of risk for property, life and supply chains. These property losses tend to be determined as much by the duration and spatial extent of flooding as by the depth and velocity of inundation. High duration floods are typically induced by persistent rainfall (up to 30 day duration) as seen recently in Thailand, Pakistan, the Ohio and the Mississippi Rivers, France, and Germany. Events related to persistent and recurrent rainfall appear to correspond to the persistence of specific global climate patterns that may be identifiable from global, historical data fields, and also from climate models that project future conditions. In this paper, we investigate the statistical properties of the spatial manifestation of the rainfall exceedances and floods. We present the first ever results on a global analysis of the scaling characteristics of extreme rainfall and flood event duration, volumes and contiguous flooded areas as a result of large scale organization of long duration rainfall events. Results are organized by latitude and with reference to the phases of ENSO, and reveal surprising invariance across latitude. Speculation as to the potential relation to the dynamical factors is presented

  18. Future changes in heat-waves, droughts and floods in 571 European cities

    Science.gov (United States)

    Guerreiro, Selma; Dawson, Richard; Kilsby, Chris; Lewis, Elizabeth; Ford, Alistair

    2017-04-01

    Future changes in heat-waves, droughts and floods were assessed for 571 European cities. We used all available climate model runs from the Coupled Model Intercomparison Project Phase 5 - CMIP5 - for their higher emission scenario (RCP8.5) and grouped the projections into Low, Mid and High impact scenarios. This resulted in impact projections outside the range of published literature, but enabled us to better understand uncertainties in future climate projections (both due to climate model errors but also the effects of natural variability) therefore providing the basis for broad scale risk analysis and thereafter identification of robust adaptation strategies. While heat-waves will worsen for every European city, changes in droughts and floods are spatially variable and climate model dependent. The largest increases in the number of heat-wave days are shown to be in southern Europe, but higher heat-wave maximum temperature increases are expected in the mid-latitudes. In the low impact scenario, drought conditions are expected to intensify only in southern Europe while river flooding in expected to worsen in the north. However, in the high impact scenario most European cities show increases in both drought conditions and river flooding. There is a very wide range of projections for future changes in Europe with disagreement between different studies, partly due to their methodological differences but potentially also due to the small number of climate model runs that limits the uncertainties due to natural variability and model errors that each study captures.

  19. Hydrometeorological network for flood monitoring and modeling

    Science.gov (United States)

    Efstratiadis, Andreas; Koussis, Antonis D.; Lykoudis, Spyros; Koukouvinos, Antonis; Christofides, Antonis; Karavokiros, George; Kappos, Nikos; Mamassis, Nikos; Koutsoyiannis, Demetris

    2013-08-01

    Due to its highly fragmented geomorphology, Greece comprises hundreds of small- to medium-size hydrological basins, in which often the terrain is fairly steep and the streamflow regime ephemeral. These are typically affected by flash floods, occasionally causing severe damages. Yet, the vast majority of them lack flow-gauging infrastructure providing systematic hydrometric data at fine time scales. This has obvious impacts on the quality and reliability of flood studies, which typically use simplistic approaches for ungauged basins that do not consider local peculiarities in sufficient detail. In order to provide a consistent framework for flood design and to ensure realistic predictions of the flood risk -a key issue of the 2007/60/EC Directive- it is essential to improve the monitoring infrastructures by taking advantage of modern technologies for remote control and data management. In this context and in the research project DEUCALION, we have recently installed and are operating, in four pilot river basins, a telemetry-based hydro-meteorological network that comprises automatic stations and is linked to and supported by relevant software. The hydrometric stations measure stage, using 50-kHz ultrasonic pulses or piezometric sensors, or both stage (piezometric) and velocity via acoustic Doppler radar; all measurements are being temperature-corrected. The meteorological stations record air temperature, pressure, relative humidity, wind speed and direction, and precipitation. Data transfer is made via GPRS or mobile telephony modems. The monitoring network is supported by a web-based application for storage, visualization and management of geographical and hydro-meteorological data (ENHYDRIS), a software tool for data analysis and processing (HYDROGNOMON), as well as an advanced model for flood simulation (HYDROGEIOS). The recorded hydro-meteorological observations are accessible over the Internet through the www-application. The system is operational and its

  20. Near Real-Time Flood Monitoring and Impact Assessment Systems. Chapter 6; [Case Study: 2011 Flooding in Southeast Asia

    Science.gov (United States)

    Ahamed, Aakash; Bolten, John; Doyle, Colin; Fayne, Jessica

    2016-01-01

    Floods are the costliest natural disaster, causing approximately 6.8 million deaths in the twentieth century alone. Worldwide economic flood damage estimates in 2012 exceed $19 Billion USD. Extended duration floods also pose longer term threats to food security, water, sanitation, hygiene, and community livelihoods, particularly in developing countries. Projections by the Intergovernmental Panel on Climate Change (IPCC) suggest that precipitation extremes, rainfall intensity, storm intensity, and variability are increasing due to climate change. Increasing hydrologic uncertainty will likely lead to unprecedented extreme flood events. As such, there is a vital need to enhance and further develop traditional techniques used to rapidly assess flooding and extend analytical methods to estimate impacted population and infrastructure. Measuring flood extent in situ is generally impractical, time consuming, and can be inaccurate. Remotely sensed imagery acquired from space-borne and airborne sensors provides a viable platform for consistent and rapid wall-to-wall monitoring of large flood events through time. Terabytes of freely available satellite imagery are made available online each day by NASA, ESA, and other international space research institutions. Advances in cloud computing and data storage technologies allow researchers to leverage these satellite data and apply analytical methods at scale. Repeat-survey earth observations help provide insight about how natural phenomena change through time, including the progression and recession of floodwaters. In recent years, cloud-penetrating radar remote sensing techniques (e.g., Synthetic Aperture Radar) and high temporal resolution imagery platforms (e.g., MODIS and its 1-day return period), along with high performance computing infrastructure, have enabled significant advances in software systems that provide flood warning, assessments, and hazard reduction potential. By incorporating social and economic data

  1. Towards a Risk Governance Culture in Flood Policy—Findings from the Implementation of the “Floods Directive” in Germany

    Directory of Open Access Journals (Sweden)

    Klaus Wagner

    2012-02-01

    Full Text Available The European Directive on the Assessment and Management of Flood Risks is likely to cause changes to flood policy in Germany and other member states. With its risk governance approach, it introduces a holistic and catchment-oriented flood risk management and tries to overcome shortcomings of the past, such as the event-driven construction of mainly structural measures. However, there is leeway for interpretation in implementing the directive. The present paper gives an overview on the implementation of the floods directive in Germany and is divided into two qualitative empirical case studies. Case Study I investigates the level of acceptance of the floods directive among decision-makers in the German part of the Rhine river basin. Findings show that the federal states respond differently to the impulse given by the floods directive. Whereas some decision-makers opt for a pro-forma implementation, others take it as a starting point to systematically improve their flood policy. Case Study II presents recommendations for a successful implementation of flood risk management plans that have been developed within a project for the water authority in Bavaria and might be interesting for other federal/member states. For a participation of the interested parties on the level of shared decision-making, the planning process has to work on sub-management-plan level (15–20 communities. The water resources authority has to adopt a multi-faceted role (expert, responsible or interested party depending on the discussed topics.

  2. Science Academies' Refresher Course on Hydrology of Floods

    Indian Academy of Sciences (India)

    2017-10-31

    reservoir scheduling, remote sensing and GIS applications in flood modeling and management, soil erosion and sediment yield, climate change: introduction, basics including IPCC reports, assessment, projections and related ...

  3. The Impacts of Pelosika and Ameroro Dams in the Flood Control Performance of Konaweha River

    Directory of Open Access Journals (Sweden)

    Arif Sidik

    2016-09-01

    Full Text Available Konaweeha watershed is the largest watershed in Southeast Sulawesi with Konaweeha River as the main river. The main issues in Konaweeha Watershed is floods that occur caused damage to infrastructure and public facilities, lowering agricultural production, and cause fatalities. One of the government's efforts to cope with the flooding problem in Konaweeha Watershed is planning the construction of multi-purpose dams in the upstream of Konaweeha Watershed that is Pelosika Dam and Ameroso Dam. Necessary to study the flood control performance of the two dams. Analyses were performed with hydrologic-hydraulic modeling using HEC-HMS software (Hydrologic Modelling System version 4.0 and HEC-RAS (River Analysis System version 4.1. The design rainfalls that were used as input to the model were 2 year, 5-year, 10-year and 25 year. Scenarios used in this study are: (1 Existing Scenario (2 Pelosika Dam Scenario; (3 Ameroro Dam Scenario; (4 Pelosika and Ameroro Dams Scenario. The results showed the maximum water surface elevation along the downstream of Konaweeha River in Scenario (2 and (4 were almost the same in the 2 and 5 years return period design flood. However, in case of 10 and 25 years return period, the difference of maximum water surface elevation at downstream of Konaweeha River was slightly significant. Furthermore, the damping efficiency of the peak discharge (at Probably Maximum Flood or PMF was found to be 71.70% and 18.18% for the individual Pelosika Dam and Ameroro Dam respectively. Further discussion suggests the development of Pelosika Dam as the higher priority rather than that of the Ameroro Dam.

  4. Climate Change Impacts on Flooding in Southeastern Austria

    Science.gov (United States)

    Switanek, Matt; Truhetz, Heimo; Reszler, Christian

    2015-04-01

    Floods in southeastern Austria can cause significant damage to life, property and infrastructure. These flood events are often the result of extreme precipitation from small-scale convective storms. In order to more accurately model the changes to flood magnitude and frequency, Regional Climate Models (RCMs) must be able to simulate small-scale convective storms similar to those that have been observed. Even as computational resources have increased, RCMs are just now achieving the high spatial and temporal scales necessary to physically resolve the processes that govern small-scale convection. With increased resolution, RCMs can rely on their internal physics to model convective precipitation and need not depend on parameterization. This study uses historical and future scenarios of Regional Climate Models (RCMs) run at a spatial scale of 3 km and temporal scale of 1 hr. In order to subsequently force a hydrological flood model, the sub-daily precipitation and temperature data from the RCMs are first bias corrected. A newly proposed bias correction method is presented and compared to the commonly used quantile mapping. The proposed bias correction method performs better in its ability to preserve the model projected climate change signal (measured by changes in mean and variance). Lastly, the changes in the quantity and frequency of projected extreme precipitation, at the watershed level, are analyzed with respect to the historic time period. With these improvements in dynamical modeling and bias correction methods, a clearer picture emerges revealing the more likely impacts climate change will have on floods in southeastern Austria.

  5. Environmental impact assessment using a utility-based recursive evidential reasoning approach for structural flood mitigation measures in Metro Manila, Philippines.

    Science.gov (United States)

    Gilbuena, Romeo; Kawamura, Akira; Medina, Reynaldo; Nakagawa, Naoko; Amaguchi, Hideo

    2013-12-15

    In recent years, the practice of environmental impact assessment (EIA) has created significant awareness on the role of environmentally sound projects in sustainable development. In view of the recent studies on the effects of climate change, the Philippine government has given high priority to the construction of flood control structures to alleviate the destructive effects of unmitigated floods, especially in highly urbanized areas like Metro Manila. EIA thus, should be carefully and effectively carried out to maximize or optimize the potential benefits that can be derived from structural flood mitigation measures (SFMMs). A utility-based environmental assessment approach may significantly aid flood managers and decision-makers in planning for effective and environmentally sound SFMM projects. This study proposes a utility-based assessment approach using the rapid impact assessment matrix (RIAM) technique, coupled with the evidential reasoning approach, to rationally and systematically evaluate the ecological and socio-economic impacts of 4 planned SFMM projects (i.e. 2 river channel improvements and 2 new open channels) in Metro Manila. Results show that the overall environmental effects of each of the planned SFMM projects are positive, which indicate that the utility of the positive impacts would generally outweigh the negative impacts. The results also imply that the planned river channel improvements will yield higher environmental benefits over the planned open channels. This study was able to present a clear and rational approach in the examination of overall environmental effects of SFMMs, which provides valuable insights that can be used by decision-makers and policy makers to improve the EIA practice and evaluation of projects in the Philippines. Copyright © 2013 Elsevier Ltd. All rights reserved.

  6. Modeling urban coastal flood severity from crowd-sourced flood reports using Poisson regression and Random Forest

    Science.gov (United States)

    Sadler, J. M.; Goodall, J. L.; Morsy, M. M.; Spencer, K.

    2018-04-01

    Sea level rise has already caused more frequent and severe coastal flooding and this trend will likely continue. Flood prediction is an essential part of a coastal city's capacity to adapt to and mitigate this growing problem. Complex coastal urban hydrological systems however, do not always lend themselves easily to physically-based flood prediction approaches. This paper presents a method for using a data-driven approach to estimate flood severity in an urban coastal setting using crowd-sourced data, a non-traditional but growing data source, along with environmental observation data. Two data-driven models, Poisson regression and Random Forest regression, are trained to predict the number of flood reports per storm event as a proxy for flood severity, given extensive environmental data (i.e., rainfall, tide, groundwater table level, and wind conditions) as input. The method is demonstrated using data from Norfolk, Virginia USA from September 2010 to October 2016. Quality-controlled, crowd-sourced street flooding reports ranging from 1 to 159 per storm event for 45 storm events are used to train and evaluate the models. Random Forest performed better than Poisson regression at predicting the number of flood reports and had a lower false negative rate. From the Random Forest model, total cumulative rainfall was by far the most dominant input variable in predicting flood severity, followed by low tide and lower low tide. These methods serve as a first step toward using data-driven methods for spatially and temporally detailed coastal urban flood prediction.

  7. Decision Making Methodology to Mitigate Damage From Glacial Lake Outburst Floods From Imja Lake in Nepal

    Science.gov (United States)

    McKinney, D. C.; Cuellar, A. D.

    2015-12-01

    Climate change has accelerated glacial retreat in high altitude glaciated regions of Nepal leading to the growth and formation of glacier lakes. Glacial lake outburst floods (GLOF) are sudden events triggered by an earthquake, moraine failure or other shock that causes a sudden outflow of water. These floods are catastrophic because of their sudden onset, the difficulty predicting them, and enormous quantity of water and debris rapidly flooding downstream areas. Imja Lake in the Himalaya of Nepal has experienced accelerated growth since it first appeared in the 1960s. Communities threatened by a flood from Imja Lake have advocated for projects to adapt to the increasing threat of a GLOF. Nonetheless, discussions surrounding projects for Imja have not included a rigorous analysis of the potential consequences of a flood, probability of an event, or costs of mitigation projects in part because this information is unknown or uncertain. This work presents a demonstration of a decision making methodology developed to rationally analyze the risks posed by Imja Lake and the various adaptation projects proposed using available information. In this work the authors use decision analysis, data envelopement analysis (DEA), and sensitivity analysis to assess proposed adaptation measures that would mitigate damage in downstream communities from a GLOF. We use an existing hydrodynamic model of the at-risk area to determine how adaptation projects will affect downstream flooding and estimate fatalities using an empirical method developed for dam failures. The DEA methodology allows us to estimate the value of a statistical life implied by each project given the cost of the project and number of lives saved to determine which project is the most efficient. In contrast the decision analysis methodology requires fatalities to be assigned a cost but allows the inclusion of uncertainty in the decision making process. We compare the output of these two methodologies and determine the

  8. Assessment of the Change Detection Procedure Dedicated to Flood Monitoring Using Envisat Wide Swath Mode Data

    Science.gov (United States)

    Li, Jiren; Yesou, Herve; Malosti, Rita; Andreoli, Remi; Huang, Shifeng; Xin, Jingfeng; Cattaneo, Fabrizia

    2008-04-01

    The Flood Dragon project enhances the Envisat contribution for natural disaster monitoring. Flood DFRAGON project had much more exploited the ENVISAT resource for crisis management than the International Charter Space and major Disasters since 2002. Indeed, during the 2005, 2006 and 2007 Chinese flood seasons, over the 27 attempted NRT exploitations of Envisat, 23 were successful. Obtained results over floods, affecting Yangtze and Songua, Huaihe watersheds as pollution events on Taihue lake and Nen River are illustrated. Lessons are discussed in terms of programming, downloading, processing, and images type and format. Recommendations for the background mission of the future Sentinel 1 constellation are given.

  9. Flood risk and adaptation strategies under climate change and urban expansion: A probabilistic analysis using global data.

    Science.gov (United States)

    Muis, Sanne; Güneralp, Burak; Jongman, Brenden; Aerts, Jeroen C J H; Ward, Philip J

    2015-12-15

    An accurate understanding of flood risk and its drivers is crucial for effective risk management. Detailed risk projections, including uncertainties, are however rarely available, particularly in developing countries. This paper presents a method that integrates recent advances in global-scale modeling of flood hazard and land change, which enables the probabilistic analysis of future trends in national-scale flood risk. We demonstrate its application to Indonesia. We develop 1000 spatially-explicit projections of urban expansion from 2000 to 2030 that account for uncertainty associated with population and economic growth projections, as well as uncertainty in where urban land change may occur. The projections show that the urban extent increases by 215%-357% (5th and 95th percentiles). Urban expansion is particularly rapid on Java, which accounts for 79% of the national increase. From 2000 to 2030, increases in exposure will elevate flood risk by, on average, 76% and 120% for river and coastal floods. While sea level rise will further increase the exposure-induced trend by 19%-37%, the response of river floods to climate change is highly uncertain. However, as urban expansion is the main driver of future risk, the implementation of adaptation measures is increasingly urgent, regardless of the wide uncertainty in climate projections. Using probabilistic urban projections, we show that spatial planning can be a very effective adaptation strategy. Our study emphasizes that global data can be used successfully for probabilistic risk assessment in data-scarce countries. Copyright © 2015 Elsevier B.V. All rights reserved.

  10. Cities and Sea Level Rise: A Roadmap for Flood Hazard Adaptation

    Science.gov (United States)

    Horn, D. P.; Cousins, A.

    2015-12-01

    Coastal cities will face a range of increasingly severe challenges as sea level rises, and adaptation to future flood risk will require more than structural defences. Many cities will not be able to rely solely on engineering structures for protection and will need to develop a suite of policy responses to increase their resilience to impacts of rising sea level. Local governments generally maintain day-to-day responsibility and control over the use of the vast majority of property at risk of flooding, and the tools to promote flood risk adaptation are already within the capacity of most cities. Policy tools available to address other land-use problems can be refashioned and used to adapt to sea level rise. This study reviews approaches for urban adaptation through case studies of cities which have developed flood adaptation strategies that combine structural defences with innovative approaches to living with flood risk. The aim of the overall project is to produce a 'roadmap' to guide practitioners through the process of analysing coastal flood risk in urban areas. Technical knowledge of flood risk reduction measures is complemented with a consideration of the essential impact that local policy has on the treatment of coastal flooding and the constraints and opportunities that result from the specific country or locality characteristics in relation to economic, political, social and environmental priorities, which are likely to dictate the approach to coastal flooding and the actions proposed. Detailed analyses of the adaptation strategies used by Rotterdam (Netherlands), Bristol (UK), and Norfolk (Virginia) are used to draw out a range of good practice elements that promote effective adaptation to sea level rise. These can be grouped into risk reduction, governance issues, and insurance, and can be used to provide examples of how other cities could adopt and implement flood adaptation strategies from a relatively limited starting position. Most cities will

  11. The Development of Brazilian Municipalities Flooded by Hydropower Plants

    Science.gov (United States)

    Araujo, N.; Moretto, E. M.; Roquetti, D. R.; Beduschi, L. C.; Praia, A.; Pulice, S.; Albiach, E.; Athayde, S.

    2016-12-01

    Hydropower plants cause negative environmental impacts during the phases of construction and operation. On the other hand, there is a general assumption that these projects also induce local development of the affected places, since there is a great influx of social and financial capital brought locally, especially during the construction phase the relationship between hydropower plant implementation s and local development has been controversial in the Environmental Impact Assessment field, and there is no empirical evidence showing how hydroelectric dam construction affects local development. Considering municipal development as a kind of local development and operationalizing the concept of human development by adopting income, longevity and education dimensions defined by Amartya Sen, this study aimed to verify empirical evidences regarding the role of hydropower plants in human development of their flooded municipalities in Brazil. For this, we considered 134 hydroelectric plants and correspondent 641 flooded municipalities, for which 155 human development indicators were obtained for the period of 2000 to 2010. Results obtained from statistical correlation analysis and their assumption tests showed that increases in the municipal flooded area and increases in the period of flooding - to which a given municipality is submitted - were associated with lower performances of human development indicators. Specifically, increases in social inequality, poverty and lower performances of longevity and education were detected for the flooded municipalities. We also found that the financial compensation was associated with better performance of municipal income and lower performances of education and longevity. Finally, approaching the growth poles theory of François Perroux and the productive linkages theory of Albert Hirschman, we suggest that the size of the flooded areas, the flooding period and the financial compensation may lead to an enclave situation in

  12. Capacity of the inflow river channels of the Krpelany and Hricov reservoirs with respect to flood control

    International Nuclear Information System (INIS)

    Capekova, Z.

    2004-01-01

    In this presentation author deals with the capacity of the inflow river channels of the Krpelany and Hricov reservoirs with respect to flood control (Vah River, Orava River, Kysuce River and Rajcianka River, Slovakia)

  13. Managing flood risk through collaborative governance | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2013-05-21

    May 21, 2013 ... Managing flood risk through collaborative governance ... This article profiles a project supported by IDRC's Climate Change and Water program, ... and in the intensity of extreme weather events are resulting in the erosion of lo.

  14. Regional Sediment Management (RSM) Principles in Flood Recovery: Incorporating RSM after the 2011 Missouri River Flood

    Science.gov (United States)

    2013-06-01

    project also included adding seepage blankets in mul- tiple areas along the landward side of the lev- ee. At the Upper Hamburg Chute site, less than...that served as the downstream shore of the spillway pond. The pond is part of a recreation area and serves as a wa- ter intake for the Garrison fish ...Corps of Engineers (USACE) Re- gional Sediment Management (RSM) principles into a wide variety of projects as part of flood recov- ery and

  15. Property flood resilience database: an innovative response for the insurance market

    Directory of Open Access Journals (Sweden)

    Garvin Stephen

    2016-01-01

    Full Text Available The property flood resilience database (PFR-d has been created through a research feasibility study undertaken by the Building Research Establishment, AXA Insurance and Lexis Nexis Risk Solutions in the UK. The project was funded by Innovate-UK and was undertaken over the period of May 2014 to August 2015. There has been a growing realisation that flood management has to move from a position where flood defence (e.g. major river barriers and drainage infrastructure is the only solution to flood risk to one of flood resilience. This shift requires an increase in responsibility for a variety of stakeholders, including property owners. The PFR-d was conceived as a product that code fit within the existing insurance frameworks and systems. The PFR-d is a ‘missing piece of data’ for insurers that could assist in providing more appropriate insurance pricing in high flood risk areas, or where properties have suffered repeat flooding events.

  16. Flash floods in Catalonia: a recurrent situation

    Science.gov (United States)

    Llasat, M. C.; Lindbergh, S.; Llasat-Botija, M.; Rodríguez, A.; Zaragoza, A.

    2009-09-01

    characterization of flash flood events. With this aim, the eleven cases selected in the framework of the FLASH European project have been analysed in depth. The relationship between the rainfall recorded above 60, 100 and 150 mm and the municipalities affected by floods have been analysed.

  17. Seawater-flooding events and impact on freshwater lenses of low-lying islands: Controlling factors, basic management and mitigation

    Science.gov (United States)

    Gingerich, Stephen B.; Voss, Clifford I.; Johnson, Adam G.

    2017-01-01

    An unprecedented set of hydrologic observations was collected after the Dec 2008 seawater-flooding event on Roi-Namur, Kwajalein Atoll, Republic of the Marshall Islands. By two days after the seawater flooding that occurred at the beginning of dry season, the observed salinity of water withdrawn by the island’s main skimming well increased to 100% seawater concentration, but by ten days later already decreased to only 10–20% of seawater fraction. However, the damaging impact on the potability of the groundwater supply (when pumped water had concentrations above 1% seawater fraction) lasted 22 months longer. The data collected make possible analyses of the hydrologic factors that control recovery and management of the groundwater-supply quality on Roi-Namur and on similar low-lying islands.With the observed data as a guide, three-dimensional numerical-model simulation analyses reveal how recovery is controlled by the island’s hydrology. These also allow evaluation of the efficacy of basic water-quality management/mitigation alternatives and elucidate how groundwater withdrawal and timing of the seawater-flooding event affect the length of recovery. Simulations show that, as might be expected, by adding surplus captured rainwater as artificial recharge, the freshwater-lens recovery period (after which potable groundwater may again be produced) can be shortened, with groundwater salinity remaining lower even during the dry season, a period during which no artificial recharge is applied. Simulations also show that the recovery period is not lengthened appreciably by groundwater withdrawals during recovery. Simulations further show that had the flooding event occurred at the start of the wet season, the recovery period would have been about 25% (5.5 months) shorter than actually occurred during the monitored flood that occurred at the dry-season start. Finally, analyses show that artificial recharge improves freshwater-lens water quality, making possible longer

  18. Seawater-flooding events and impact on freshwater lenses of low-lying islands: Controlling factors, basic management and mitigation

    Science.gov (United States)

    Gingerich, Stephen B.; Voss, Clifford I.; Johnson, Adam G.

    2017-08-01

    An unprecedented set of hydrologic observations was collected after the Dec 2008 seawater-flooding event on Roi-Namur, Kwajalein Atoll, Republic of the Marshall Islands. By two days after the seawater flooding that occurred at the beginning of dry season, the observed salinity of water withdrawn by the island's main skimming well increased to 100% seawater concentration, but by ten days later already decreased to only 10-20% of seawater fraction. However, the damaging impact on the potability of the groundwater supply (when pumped water had concentrations above 1% seawater fraction) lasted 22 months longer. The data collected make possible analyses of the hydrologic factors that control recovery and management of the groundwater-supply quality on Roi-Namur and on similar low-lying islands. With the observed data as a guide, three-dimensional numerical-model simulation analyses reveal how recovery is controlled by the island's hydrology. These also allow evaluation of the efficacy of basic water-quality management/mitigation alternatives and elucidate how groundwater withdrawal and timing of the seawater-flooding event affect the length of recovery. Simulations show that, as might be expected, by adding surplus captured rainwater as artificial recharge, the freshwater-lens recovery period (after which potable groundwater may again be produced) can be shortened, with groundwater salinity remaining lower even during the dry season, a period during which no artificial recharge is applied. Simulations also show that the recovery period is not lengthened appreciably by groundwater withdrawals during recovery. Simulations further show that had the flooding event occurred at the start of the wet season, the recovery period would have been about 25% (5.5 months) shorter than actually occurred during the monitored flood that occurred at the dry-season start. Finally, analyses show that artificial recharge improves freshwater-lens water quality, making possible longer use of

  19. Temporal stability and transferability of models of willingness to pay for flood control and wetland conservation

    NARCIS (Netherlands)

    Brouwer, R.; Bateman, I.J.

    2005-01-01

    This study investigates the temporal stability and transferability of dichotomous choice willingness to pay responses and their determinants from two large-scale contingent valuation surveys in the area of flood control and wetland conservation. The study considers a time period between surveys

  20. Socio-economic Impact Analysis for Near Real-Time Flood Detection in the Lower Mekong River Basin

    Science.gov (United States)

    Oddo, P.; Ahamed, A.; Bolten, J. D.

    2017-12-01

    Flood events pose a severe threat to communities in the Lower Mekong River Basin. The combination of population growth, urbanization, and economic development exacerbate the impacts of these flood events. Flood damage assessments are frequently used to quantify the economic losses in the wake of storms. These assessments are critical for understanding the effects of flooding on the local population, and for informing decision-makers about future risks. Remote sensing systems provide a valuable tool for monitoring flood conditions and assessing their severity more rapidly than traditional post-event evaluations. The frequency and severity of extreme flood events are projected to increase, further illustrating the need for improved flood monitoring and impact analysis. In this study we implement a socio-economic damage model into a decision support tool with near real-time flood detection capabilities (NASA's Project Mekong). Surface water extent for current and historical floods is found using multispectral Moderate-resolution Imaging Spectroradiometer (MODIS) 250-meter imagery and the spectral Normalized Difference Vegetation Index (NDVI) signatures of permanent water bodies (MOD44W). Direct and indirect damages to populations, infrastructure, and agriculture are assessed using the 2011 Southeast Asian flood as a case study. Improved land cover and flood depth assessments result in a more refined understanding of losses throughout the Mekong River Basin. Results suggest that rapid initial estimates of flood impacts can provide valuable information to governments, international agencies, and disaster responders in the wake of extreme flood events.

  1. Flooding Experiments and Modeling for Improved Reactor Safety

    International Nuclear Information System (INIS)

    Solmos, M.; Hogan, K.J.; VIerow, K.

    2008-01-01

    Countercurrent two-phase flow and 'flooding' phenomena in light water reactor systems are being investigated experimentally and analytically to improve reactor safety of current and future reactors. The aspects that will be better clarified are the effects of condensation and tube inclination on flooding in large diameter tubes. The current project aims to improve the level of understanding of flooding mechanisms and to develop an analysis model for more accurate evaluations of flooding in the pressurizer surge line of a Pressurized Water Reactor (PWR). Interest in flooding has recently increased because Countercurrent Flow Limitation (CCFL) in the AP600 pressurizer surge line can affect the vessel refill rate following a small break LOCA and because analysis of hypothetical severe accidents with the current flooding models in reactor safety codes shows that these models represent the largest uncertainty in analysis of steam generator tube creep rupture. During a hypothetical station blackout without auxiliary feedwater recovery, should the hot leg become voided, the pressurizer liquid will drain to the hot leg and flooding may occur in the surge line. The flooding model heavily influences the pressurizer emptying rate and the potential for surge line structural failure due to overheating and creep rupture. The air-water test results in vertical tubes are presented in this paper along with a semi-empirical correlation for the onset of flooding. The unique aspects of the study include careful experimentation on large-diameter tubes and an integrated program in which air-water testing provides benchmark knowledge and visualization data from which to conduct steam-water testing

  2. Modeled changes in 100 year Flood Risk and Asset Damages within Mapped Floodplains of the Contiguous United States

    Science.gov (United States)

    Wobus, C. W.; Gutmann, E. D.; Jones, R.; Rissing, M.; Mizukami, N.; Lorie, M.; Mahoney, H.; Wood, A.; Mills, D.; Martinich, J.

    2017-12-01

    A growing body of recent work suggests that the extreme weather events that drive inland flooding are likely to increase in frequency and magnitude in a warming climate, thus increasing monetary damages from flooding in the future. We use hydrologic projections based on the Coupled Model Intercomparison Project Phase 5 (CMIP5) to estimate changes in the frequency of modeled 1% annual exceedance probability flood events at 57,116 locations across the contiguous United States (CONUS). We link these flood projections to a database of assets within mapped flood hazard zones to model changes in inland flooding damages throughout the CONUS over the remainder of the 21st century, under two greenhouse gas (GHG) emissions scenarios. Our model generates early 21st century flood damages that reasonably approximate the range of historical observations, and trajectories of future damages that vary substantially depending on the GHG emissions pathway. The difference in modeled flood damages between higher and lower emissions pathways approaches $4 billion per year by 2100 (in undiscounted 2014 dollars), suggesting that aggressive GHG emissions reductions could generate significant monetary benefits over the long-term in terms of reduced flood risk. Although the downscaled hydrologic data we used have been applied to flood impacts studies elsewhere, this research expands on earlier work to quantify changes in flood risk by linking future flood exposure to assets and damages at a national scale. Our approach relies on a series of simplifications that could ultimately affect damage estimates (e.g., use of statistical downscaling, reliance on a nationwide hydrologic model, and linking damage estimates only to 1% AEP floods). Although future work is needed to test the sensitivity of our results to these methodological choices, our results suggest that monetary damages from inland flooding could be substantially reduced through more aggressive GHG mitigation policies.

  3. Flood control construction of Shidao Bay nuclear power plant and safety analysis for hypothetical accident of HTR-PM

    International Nuclear Information System (INIS)

    Chen Yongrong; Zhang Keke; Zhu Li

    2014-01-01

    A series of events triggered by tsunami eventually led to the Fukushima nuclear accident. For drawing lessons from the nuclear accident and applying to Shidao Bay nuclear power plant flood control construction, we compare with the state laws and regulations, and prove the design of Shidao Bay nuclear power plant flood construction. Through introducing the history of domestic tsunamis and the national researches before and after the Fukushima nuclear accident, we expound the tsunami hazards of Shidao Bay nuclear power plant. In addition, in order to verify the safety of HTR-PM, we anticipate the contingent accidents after ''superposition event of earthquake and extreme flood'', and analyse the abilities and measures of HTR-PM to deal with these beyond design basis accidents (BDBA). (author)

  4. Application of Flood Nomograph for Flood Forecasting in Urban Areas

    Directory of Open Access Journals (Sweden)

    Eui Hoon Lee

    2018-01-01

    Full Text Available Imperviousness has increased due to urbanization, as has the frequency of extreme rainfall events by climate change. Various countermeasures, such as structural and nonstructural measures, are required to prepare for these effects. Flood forecasting is a representative nonstructural measure. Flood forecasting techniques have been developed for the prevention of repetitive flood damage in urban areas. It is difficult to apply some flood forecasting techniques using training processes because training needs to be applied at every usage. The other flood forecasting techniques that use rainfall data predicted by radar are not appropriate for small areas, such as single drainage basins. In this study, a new flood forecasting technique is suggested to reduce flood damage in urban areas. The flood nomograph consists of the first flooding nodes in rainfall runoff simulations with synthetic rainfall data at each duration. When selecting the first flooding node, the initial amount of synthetic rainfall is 1 mm, which increases in 1 mm increments until flooding occurs. The advantage of this flood forecasting technique is its simple application using real-time rainfall data. This technique can be used to prepare a preemptive response in the process of urban flood management.

  5. DRIHM Project: Floods in Serbia in May 2014

    Science.gov (United States)

    Ivkovic, Marija; Dimitrijevic, Vladimir; Dekic, Ljiljana; Mihalovic, Ana; Pejanovic, Goran

    2015-04-01

    The central parts of Balkans were affected with very deep cyclone named "Tamara" form 13th until 16th of May. Stations in western parts of Serbia recorded precipitation four times greater than average precipitation sums. Two third of that amount has felt in three days. Devastating floods occurred on Sava, Kolubara and Jadar river basins causing damage of 1.7 billion Euros, and loss of 24 human lives. Three days before the event, a first warning was issued pointing that the precipitation amounts will exceed 40 mm of rain for 12 hours, accompanied with the hydrological information that the water level on Sava and Kolubara rivers will significantly rise. Within the DRIHM project and its e-infrastructure it was possible to test a combination of different Numerical Weather Prediction models together with stochastic downscaling algorithms to enable the production of more effective quantitative rainfall predictions for this severe meteorological event. Hydrometeorological models in DRIHM are building blocks that can be easily linked together in a form of hydrometeorological chain. For this case the HBV model, distributed hydrological model, was used as the hydrological component in the model chain and RainFARM as stochastic downscaling tool. Results obtained with these models are shown and compared with Hyprom, one of the hydrological models also used in RHMSS with the aim of scoping the current capabilities for the early warning of the extreme events. The information where and when the High Impact Weather Event (HIWE) can occur is very important for the proper overview of the possible overall influence. Different precipitation distribution both in space and in time is allowing us to estimate the future state of the system but also to see the range of the possible outcomes.

  6. Real-time flood extent maps based on social media

    Science.gov (United States)

    Eilander, Dirk; van Loenen, Arnejan; Roskam, Ruud; Wagemaker, Jurjen

    2015-04-01

    information, we project the water depth observations in tweets on a digital elevation model using a flood-fill algorithm. Based on statistical methods we combine the large numbers of observations in order to create time series of flood extent maps. Early results indicate this method is very promising.

  7. FEMA Hazard Mitigation Assistance Flood Mitigation Assistance (FMA) Data

    Data.gov (United States)

    Department of Homeland Security — This dataset contains closed and obligated projects funded under the following Hazard Mitigation Assistance (HMA) grant programs: Flood Mitigation Assistance (FMA)....

  8. International Severe Weather and Flash Flood Hazard Early Warning Systems—Leveraging Coordination, Cooperation, and Partnerships through a Hydrometeorological Project in Southern Africa

    Directory of Open Access Journals (Sweden)

    Robert Jubach

    2016-06-01

    Full Text Available Climate, weather and water hazards do not recognize national boundaries. Transboundary/regional programs and cooperation are essential to reduce the loss of lives and damage to livelihoods when facing these hazards. The development and implementation of systems to provide early warnings for severe weather events such as cyclones and flash floods requires data and information sharing in real time, and coordination among the government agencies at all levels. Within a country, this includes local, municipal, provincial-to-national levels as well as regional and international entities involved in hydrometeorological services and Disaster Risk Reduction (DRR. Of key importance are the National Meteorological and Hydrologic Services (NMHSs. The NMHS is generally the authority solely responsible for issuing warnings for these hazards. However, in many regions of the world, the linkages and interfaces between the NMHS and other agencies are weak or non-existent. Therefore, there is a critical need to assess, strengthen, and formalize collaborations when addressing the concept of reducing risk and impacts from severe weather and floods. The U.S. Agency for International Development/Office of U.S. Foreign Disaster Assistance; the United Nations World Meteorological Organization (WMO; the WMO Southern Africa Regional Specialized Meteorological Center, hosted by the South African Weather Service; the U.S. National Oceanic and Atmospheric Administration/National Weather Service and the Hydrologic Research Center (a non-profit corporation are currently implementing a project working with Southern Africa NMHSs on addressing this gap. The project aims to strengthen coordination and collaboration mechanisms from national to local levels. The project partners are working with the NMHSs to apply and implement appropriate tools and infrastructure to enhance currently operational severe weather and flash flood early warning systems in each country in support of

  9. Water levels shape fishing participation in flood-control reservoirs

    Science.gov (United States)

    Miranda, Leandro E.; Meals, K. O.

    2013-01-01

    We examined the relationship between fishing effort (hours fished) and average March–May water level in 3 flood control reservoirs in Mississippi. Fishing effort increased as water level rose, peaked at intermediate water levels, and decreased at high water levels. We suggest that the observed arched-shaped relationship is driven by the shifting influence of fishability (adequacy of the fishing circumstances from an angler's perspective) and catch rate along a water level continuum. Fishability reduces fishing effort during low water, despite the potential for higher catch rates. Conversely, reduced catch rates and fishability at high water also curtail effort. Thus, both high and low water levels seem to discourage fishing effort, whereas anglers seem to favor intermediate water levels. Our results have implications for water level management in reservoirs with large water level fluctuations.

  10. Flood Risk Management Policy in Scotland: Research Questions Past, Present and Future

    Science.gov (United States)

    Wilkinson, Mark; Hastings, Emily; MacDonald, Jannette

    2016-04-01

    Scotland's Centre of Expertise for Waters (CREW) delivers accessible research and expert opinion to support the Scottish Government and its delivery partners in the development and implementation of water policy. It was established in 2011 by the Scottish Government (Rural and Environmental Science and Analytical Services) in recognition of a gap in the provision of short term advice and research to policy (development and implementation). Key policy areas include the Water Framework Directive, Floods Directive, Drinking Water Directive, Habitats Directive and Scotland's Hydro Nation Strategy. CREW is unique in its demand-driven and free service for policy makers and practitioners, managing the engagement between scientists, policy makers and practitioners to work effectively across this interface. The users of CREW are the Scottish Government, Scottish Environment Protection Agency, Scottish Natural Heritage and Scottish Water. CREW has funded around 100 projects relating to water policy since its inception in 2011. Of these, a significant number relate to flood risk management policy. Based on a review of work to date, this poster will give an overview of these projects and a forward look at the challenges that remain. From learning from community led flood risk management to surface water flood forecasting for urban communities, links will be made between sustainable and traditional flood risk management while considering the perceptions of stakeholders to flood risk management. How can we deliver fully integrated flood risk management options? How policy makers, scientists and land managers can better work together will also be explored.

  11. The Potential of a Surfactant/Polymer Flood in a Middle Eastern Reservoir

    Directory of Open Access Journals (Sweden)

    Meshal Algharaib

    2012-01-01

    Full Text Available An integrated full-field reservoir simulation study has been performed to determine the reservoir management and production strategies in a mature sandstone reservoir. The reservoir is a candidate for an enhanced oil recovery process or otherwise subject to abandonment. Based on its charateristics, the reservoir was found to be most suited for a surfactant/polymer (SP flood. The study started with a large data gathering and the building of a full-field three-dimensional geological model. Subsequently, a full field simulation model was built and used to history match the water flood. The history match of the water flood emphasizes the areas with remaining high oil saturations, establishes the initial condition of the reservoir for an SP flood, and generates a forecast of reserves for continued water flood operations. A sector model was constructed from the full field model and then used to study different design parameters to maximize the project profitability from the SP flood. An economic model, based on the estimated recovery, residual oil in-place, oil price, and operating costs, has been implemented in order to optimize the project profitability. The study resulted in the selection of surfactant and polymer concentrations and slug size that yielded the best economic returns when applied in this reservoir. The study shows that, in today’s oil prices, surfactant/polymer flood when applied in this reservoir has increased the ultimate oil recovery and provide a significant financial returns.

  12. Controlling flooding and water pollution with upland and streamside vegetation systems

    Science.gov (United States)

    Michael Dosskey

    2003-01-01

    Substantial research and development effort in the U.S. is being spent on developing strategies that address flooding and water pollution problems in agricultural areas. Concerns have been raised about the costs of flood damage, degradation of productive farm land, and declining water quality that are now recognized as unintended consequences of intensive, high-yield...

  13. FEMA Hazard Mitigation Assistance Repetitive Flood Claims (RFC) Data

    Data.gov (United States)

    Department of Homeland Security — This dataset contains closed and obligated projects funded under the following Hazard Mitigation Assistance (HMA) grant programs: Repetitive Flood Claims (RFC). The...

  14. Socio-hydrology: conceptualising human-flood interactions

    Directory of Open Access Journals (Sweden)

    G. Di Baldassarre

    2013-08-01

    Full Text Available Over history, humankind has tended to settle near streams because of the role of rivers as transportation corridors and the fertility of riparian areas. However, human settlements in floodplains have been threatened by the risk of flooding. Possible responses have been to resettle away and/or modify the river system by building flood control structures. This has led to a complex web of interactions and feedback mechanisms between hydrological and social processes in settled floodplains. This paper is an attempt to conceptualise these interplays for hypothetical human-flood systems. We develop a simple, dynamic model to represent the interactions and feedback loops between hydrological and social processes. The model is then used to explore the dynamics of the human-flood system and the effect of changing individual characteristics, including external forcing such as technological development. The results show that the conceptual model is able to reproduce reciprocal effects between floods and people as well as the emergence of typical patterns. For instance, when levees are built or raised to protect floodplain areas, their presence not only reduces the frequency of flooding, but also exacerbates high water levels. Then, because of this exacerbation, higher flood protection levels are required by society. As a result, more and more flooding events are avoided, but rare and catastrophic events take place.

  15. Project control of WENDELSTEIN 7-X

    International Nuclear Information System (INIS)

    Buende, R.; Gottschewsky, M.; Heinrich, S.

    2001-01-01

    WENDELSTEIN 7-X (W7-X) is an experimental stellarator presently under construction at the new branch of IPP Garching at Greifswald. Since its beginning in 1996, the project W7-X Construction has been incorporating a comprehensive project control activity to assure the plant is constructed according to schedule and budget. The working fields of the project control--organization, planning and controlling--are described together with the relevant boundary conditions of the project. The activities in these fields are highlighted and an overview of the status of the project is given with emphasis on the components on the time-critical path. As conclusions some important issues for the future of the project are specified

  16. Operational flash flood forecasting platform based on grid technology

    Science.gov (United States)

    Thierion, V.; Ayral, P.-A.; Angelini, V.; Sauvagnargues-Lesage, S.; Nativi, S.; Payrastre, O.

    2009-04-01

    Flash flood events of south of France such as the 8th and 9th September 2002 in the Grand Delta territory caused important economic and human damages. Further to this catastrophic hydrological situation, a reform of flood warning services have been initiated (set in 2006). Thus, this political reform has transformed the 52 existing flood warning services (SAC) in 22 flood forecasting services (SPC), in assigning them territories more hydrological consistent and new effective hydrological forecasting mission. Furthermore, national central service (SCHAPI) has been created to ease this transformation and support local services in their new objectives. New functioning requirements have been identified: - SPC and SCHAPI carry the responsibility to clearly disseminate to public organisms, civil protection actors and population, crucial hydrologic information to better anticipate potential dramatic flood event, - a new effective hydrological forecasting mission to these flood forecasting services seems essential particularly for the flash floods phenomenon. Thus, models improvement and optimization was one of the most critical requirements. Initially dedicated to support forecaster in their monitoring mission, thanks to measuring stations and rainfall radar images analysis, hydrological models have to become more efficient in their capacity to anticipate hydrological situation. Understanding natural phenomenon occuring during flash floods mainly leads present hydrological research. Rather than trying to explain such complex processes, the presented research try to manage the well-known need of computational power and data storage capacities of these services. Since few years, Grid technology appears as a technological revolution in high performance computing (HPC) allowing large-scale resource sharing, computational power using and supporting collaboration across networks. Nowadays, EGEE (Enabling Grids for E-science in Europe) project represents the most important

  17. On-Farm, Almond Orchard Flooding as a Viable Aquifer Recharge Alternative

    Science.gov (United States)

    Ulrich, C.; Nico, P. S.; Wu, Y.; Newman, G. A.; Conrad, M. E.; Dahlke, H. E.

    2017-12-01

    In 2014, California legislators passed the Sustainable Groundwater Management Act (SGMA), which requires groundwater sustainability agencies (areas) to identify/prioritize water basins, develop current and projected water use/needs, develop a groundwater management plan, develop fees, etc. One of the challenges for implementing SGMA is the lack of data that can support alternative groundwater recharge methods such as on-farm flooding. Prior to anthropogenic river control, river floodplains captured excess water during overbank flow in the rainy season in the CA central valley. Today levees and canals strategically route rainy season high flows to the delta/ocean when irrigation water is not needed. Utilizing farmland once again as infiltration basins for groundwater banking and aquifer recharge could be a viable answer to California's depleted central valley aquifers. Prior to 2017, U.C. Davis had partnered with the Almond Board of California (ABC) and local growers to study the efficacy of agricultural flooding and the effects on annual almond crops (. LBNL joined this team to help understand the conveyance of recharge water, using electrical resistivity tomography (ERT), into the subsurface (i.e. localized fast paths, depth of infiltration, etc.) during flooding events. The fate of the recharge water is what is significant to understanding the viability of on-farm flooding as an aquifer recharge option. In this study two orchards (in Delhi and Modesto, CA), each approximately 2 acres, were flooded during the almond tree dormant period (January), to recharge 2 acre/ft of water into the local aquifers. ERT was used to characterize (soil structure) and monitor water infiltration over a single flooding event to investigate the fate of applied water. Data were collected every hour prior to flooding (baseline), during, and after all flood water had infiltrated (about 5 days total). Our time-lapse ERT results show a heterogeneous soil structure that leads to non

  18. Green-blue water in the city: quantification of impact of source control versus end-of-pipe solutions on sewer and river floods.

    Science.gov (United States)

    De Vleeschauwer, K; Weustenraad, J; Nolf, C; Wolfs, V; De Meulder, B; Shannon, K; Willems, P

    2014-01-01

    Urbanization and climate change trends put strong pressures on urban water systems. Temporal variations in rainfall, runoff and water availability increase, and need to be compensated for by innovative adaptation strategies. One of these is stormwater retention and infiltration in open and/or green spaces in the city (blue-green water integration). This study evaluated the efficiency of three adaptation strategies for the city of Turnhout in Belgium, namely source control as a result of blue-green water integration, retention basins located downstream of the stormwater sewers, and end-of-pipe solutions based on river flood control reservoirs. The efficiency of these options is quantified by the reduction in sewer and river flood frequencies and volumes, and sewer overflow volumes. This is done by means of long-term simulations (100-year rainfall simulations) using an integrated conceptual sewer-river model calibrated to full hydrodynamic sewer and river models. Results show that combining open, green zones in the city with stormwater retention and infiltration for only 1% of the total city runoff area would lead to a 30 to 50% reduction in sewer flood volumes for return periods in the range 10-100 years. This is due to the additional surface storage and infiltration and consequent reduction in urban runoff. However, the impact of this source control option on downstream river floods is limited. Stormwater retention downstream of the sewer system gives a strong reduction in peak discharges to the receiving river. However due to the difference in response time between the sewer and river systems, this does not lead to a strong reduction in river flood frequency. The paper shows the importance of improving the interface between urban design and water management, and between sewer and river flood management.

  19. Seed Priming Improves Agronomic Trait Performance under Flooding and Non-flooding Conditions in Rice with QTL SUB1

    Directory of Open Access Journals (Sweden)

    Ramni Kumar SARKAR

    2012-12-01

    Full Text Available Farmers in South East Asia are adopting rice crop establishment methods from transplanting to direct wet or dry seeding as it requires less labour and time and comparatively less energy than transplanting. In contrast to irrigated condition, in rainfed lowland, direct seeding is a common practice. Early flooding controls weeds but decreases seedling establishment in direct seeded rice. Anaerobic germination is an important trait to counteract damages caused by early flooding. Management options which can help in crop establishment and improve crop growth under flooding might remove the constraints related to direct seeding. The investigation was carried out with two near isogenic lines Swarna and Swarna-Sub1. Swarna-Sub1 is tolerant to submergence whereas Swarna is susceptible. Seed priming was done with water and 2% Jamun (Syzygium cumini leaf extract, and it improved seedling establishment under flooding. Acceleration of growth occurred due to seed pretreatment, which resulted longer seedling and greater accumulation of biomass. Seed priming greatly hastened the activities of total amylase and alcohol dehydrogenase in Swarna-Sub1 than in Swarna. Swarna-Sub1 outperformed Swarna when the plants were cultivated under flooding. Weed biomass decreased significantly under flooding compared to non-flooding conditions. Seed priming had positive effects on yield and yield attributing parameters both under non-flooding and early flooding conditions.

  20. Pilot project for a hybrid road-flooding forecasting system on Squaw Creek : [tech transfer summary].

    Science.gov (United States)

    2014-10-01

    According to the National Weather Service, more than : half of the fatalities attributed to flash floods are : people swept away in vehicles when trying to cross an : intersection that is flooded. Efforts are underway to : improve prediction of the l...

  1. Comparison of Strategies for Climate Change Adaptation of Water Supply and Flood Control Reservoirs

    Science.gov (United States)

    Ng, T. L.; Yang, P.; Bhushan, R.

    2016-12-01

    With climate change, streamflows are expected to become more fluctuating, with more frequent and intense floods and droughts. This complicates reservoir operation, which is highly sensitive to inflow variability. We make a comparative evaluation of three strategies for adapting reservoirs to climate-induced shifts in streamflow patterns. Specifically, we examine the effectiveness of (i) expanding the capacities of reservoirs by way of new off-stream reservoirs, (ii) introducing wastewater reclamation to augment supplies, and (iii) improving real-time streamflow forecasts for more optimal decision-making. The first two are hard strategies involving major infrastructure modifications, while the third a soft strategy entailing adjusting the system operation. A comprehensive side-by-side comparison of the three strategies is as yet lacking in the literature despite the many past studies investigating the strategies individually. To this end, we developed an adaptive forward-looking linear program that solves to yield the optimal decisions for the current time as a function of an ensemble forecast of future streamflows. Solving the model repeatedly on a rolling basis with regular updating of the streamflow forecast simulates the system behavior over the entire operating horizon. Results are generated for two hypothetical water supply and flood control reservoirs of differing inflows and demands. Preliminary findings suggest that of the three strategies, improving streamflow forecasts to be most effective in mitigating the effects of climate change. We also found that, in average terms, both additional reservoir capacity and wastewater reclamation have potential to reduce water shortage and downstream flooding. However, in the worst case, the potential of the former to reduce water shortage is limited, and similarly so the potential of the latter to reduce downstream flooding.

  2. Floods characterization: from impact data to quantitative assessment

    Science.gov (United States)

    Llasat, Maria-Carmen; Gilabert, Joan; Llasat-Botija, Montserrat; Marcos, Raül; Quintana-Seguí, Pere; Turco, Marco

    2015-04-01

    This study is based on the following flood databases from Catalonia: INUNGAMA (1900-2010) which considers 372 floods (Llasat et al, 2014), PRESSGAMA (1981-2010) and HISTOGAMA (from XIV Century on) - built as part of SPHERE project and recently updated. These databases store information about flood impacts (among others) and classify them by their severity (catastrophic, extraordinary and ordinary) by means of an indicators matrix based on other studies (i.e. Petrucci et al, 2013; Llasat et al, 2013). On this research we present a comparison between flood impacts, flow data and rainfall data on a Catalan scale and particularly for the basins of Segre, Muga, Ter and Llobregat (Western Mediterranean). From a bottom-up approach, a statistical methodology has been built (trend analysis, measures of position, cumulative distribution functions and geostatistics) in order to identify quantitative thresholds that will make possible to classify the floods. The purpose of this study is to establish generic thresholds for the whole Catalan region, for this we have selected rainfall maximums of flooding episodes stored at INUNGAMA and they have been related to flood categories by boxplot diagrams. Regarding the stream flow, we have established a relation between impacts and return periods at the day when the flow is maximum. The aim is to homogenize and compare the different drainage basins and to obtain general thresholds. It is also presented detailed analyses of relations between flooding episodes, flood classification and weather typing schemes - based in Jenkinson and Collison classification (applied to the Iberian Peninsula by Spellmann, 2000). In this way it could be analyzed whether patterns for the different types of floods exist or not. Finally, this work has pointed out the need of defining a new category for the most severe episodes.

  3. Interpreting sensor measurements in dikes - experiences from UrbanFlood pilot sites

    NARCIS (Netherlands)

    Simm, J.; Jordan, D.; Topple, A.; Mokhov, I.; Pyayt, A.; Abdoun, T.; Bennett, V.; Broekhuijsen, J.; Meijer, R.; Klijn, F.; Schweckendiek, T.

    2012-01-01

    The UrbanFlood project is creating an Early Warning System framework that can be used to link sensors via the Internet to predictive models and emergency warning systems. The project includes four pilot sites to apply and validate at full scale the technology being developed in the project:

  4. Proteomic analysis of soybean hypocotyl during recovery after flooding stress.

    Science.gov (United States)

    Khan, Mudassar Nawaz; Sakata, Katsumi; Komatsu, Setsuko

    2015-05-21

    Soybean is a nutritionally important crop, but exhibits reduced growth and yields under flooding stress. To investigate soybean responses during post-flooding recovery, a gel-free proteomic technique was used to examine the protein profile in the hypocotyl. Two-day-old soybeans were flooded for 2 days and hypocotyl was collected under flooding and during the post-flooding recovery period. A total of 498 and 70 proteins were significantly changed in control and post-flooding recovering soybeans, respectively. Based on proteomic and clustering analyses, three proteins were selected for mRNA expression and enzyme activity assays. Pyruvate kinase was increased under flooding, but gradually decreased during post-flooding recovery period at protein abundance, mRNA, and enzyme activity levels. Nucleotidylyl transferase was decreased under flooding and increased during post-flooding recovery at both mRNA expression and enzyme activity levels. Beta-ketoacyl reductase 1 was increased under flooding and decreased during recovery at protein abundance and mRNA expression levels, but its enzyme activity gradually increased during the post-flooding recovery period. These results suggest that pyruvate kinase, nucleotidylyl transferase, and beta-ketoacyl reductase play key roles in post-flooding recovery in soybean hypocotyl by promoting glycolysis for the generation of ATP and regulation of secondary metabolic pathways. This study analyzed post-flooding recovery response mechanisms in soybean hypocotyl, which is a model organ for studying secondary growth, using a gel-free proteomic technique. Mass spectrometry analysis of proteins extracted from soybean hypocotyls identified 20 common proteins between control and flooding-stressed soybeans that changed significantly in abundance over time. The hypocotyl proteins that changed during post-flooding recovery were assigned to protein, development, secondary metabolism, and glycolysis categories. The analysis revealed that three

  5. Real-time dynamic control of the Three Gorges Reservoir by coupling numerical weather rainfall prediction and flood forecasting

    DEFF Research Database (Denmark)

    Wang, Y.; Chen, H.; Rosbjerg, Dan

    2013-01-01

    In reservoir operation improvement of the accuracy of forecast flood inflow and extension of forecast lead-time can effectively be achieved by using rainfall forecasts from numerical weather predictions with a hydrological catchment model. In this study, the Regional Spectrum Model (RSM), which...... is developed by the Japan Meteorological Agency, was used to forecast rainfall with 5 days lead-time in the upper region of the Three Gorges Reservoir (TGR). A conceptual hydrological model, the Xinanjiang Model, has been set up to forecast the inflow flood of TGR by the Ministry of Water Resources Information...... season 2012 as example, real-time dynamic control of the FLWL was implemented by using the forecasted reservoir flood inflow as input. The forecasted inflow with 5 days lead-time rainfall forecast was evaluated by several performance indices, including the mean relative error of the volumetric reservoir...

  6. Allowances for evolving coastal flood risk under uncertain local sea-level rise

    Science.gov (United States)

    Buchanan, M. K.; Kopp, R. E.; Oppenheimer, M.; Tebaldi, C.

    2015-12-01

    Sea-level rise (SLR) causes estimates of flood risk made under the assumption of stationary mean sea level to be biased low. However, adjustments to flood return levels made assuming fixed increases of sea level are also inaccurate when applied to sea level that is rising over time at an uncertain rate. To accommodate both the temporal dynamics of SLR and their uncertainty, we develop an Average Annual Design Life Level (AADLL) metric and associated SLR allowances [1,2]. The AADLL is the flood level corresponding to a time-integrated annual expected probability of occurrence (AEP) under uncertainty over the lifetime of an asset; AADLL allowances are the adjustment from 2000 levels that maintain current risk. Given non-stationary and uncertain SLR, AADLL flood levels and allowances provide estimates of flood protection heights and offsets for different planning horizons and different levels of confidence in SLR projections in coastal areas. Allowances are a function primarily of local SLR and are nearly independent of AEP. Here we employ probabilistic SLR projections [3] to illustrate the calculation of AADLL flood levels and allowances with a representative set of long-duration tide gauges along U.S. coastlines. [1] Rootzen et al., 2014, Water Resources Research 49: 5964-5972. [2] Hunter, 2013, Ocean Engineering 71: 17-27. [3] Kopp et al., 2014, Earth's Future 2: 383-406.

  7. Future flood risk estimates along the river Rhine

    Directory of Open Access Journals (Sweden)

    A. H. te Linde

    2011-02-01

    Full Text Available In Europe, water management is moving from flood defence to a risk management approach, which takes both the probability and the potential consequences of flooding into account. It is expected that climate change and socio-economic development will lead to an increase in flood risk in the Rhine basin. To optimize spatial planning and flood management measures, studies are needed that quantify future flood risks and estimate their uncertainties. In this paper, we estimated the current and future fluvial flood risk in 2030 for the entire Rhine basin in a scenario study. The change in value at risk is based on two land-use projections derived from a land-use model representing two different socio-economic scenarios. Potential damage was calculated by a damage model, and changes in flood probabilities were derived from two climate scenarios and hydrological modeling. We aggregated the results into seven sections along the Rhine. It was found that the annual expected damage in the Rhine basin may increase by between 54% and 230%, of which the major part (~ three-quarters can be accounted for by climate change. The highest current potential damage can be found in the Netherlands (110 billion €, compared with the second (80 billion € and third (62 billion € highest values in two areas in Germany. Results further show that the area with the highest fluvial flood risk is located in the Lower Rhine in Nordrhein-Westfalen in Germany, and not in the Netherlands, as is often perceived. This is mainly due to the higher flood protection standards in the Netherlands as compared to Germany.

  8. Strategies for Mitigation of Flood Risk in the Niger Delta, Nigeria ...

    African Journals Online (AJOL)

    jen

    ABSTRACT: The study has the major objective of evaluating flood risk mitigation strategies in the Niger. Delta, a coastal region of Nigeria that suffers from perennial flooding. The Raper argues that the structural methods of flood control tends to give a false sense of security to flood plain dwellers and thereby encouraging.

  9. Climate change impacts on flood risk and asset damages within mapped 100-year floodplains of the contiguous United States

    Science.gov (United States)

    Wobus, Cameron; Gutmann, Ethan; Jones, Russell; Rissing, Matthew; Mizukami, Naoki; Lorie, Mark; Mahoney, Hardee; Wood, Andrew W.; Mills, David; Martinich, Jeremy

    2017-12-01

    A growing body of work suggests that the extreme weather events that drive inland flooding are likely to increase in frequency and magnitude in a warming climate, thus potentially increasing flood damages in the future. We use hydrologic projections based on the Coupled Model Intercomparison Project Phase 5 (CMIP5) to estimate changes in the frequency of modeled 1 % annual exceedance probability (1 % AEP, or 100-year) flood events at 57 116 stream reaches across the contiguous United States (CONUS). We link these flood projections to a database of assets within mapped flood hazard zones to model changes in inland flooding damages throughout the CONUS over the remainder of the 21st century. Our model generates early 21st century flood damages that reasonably approximate the range of historical observations and trajectories of future damages that vary substantially depending on the greenhouse gas (GHG) emissions pathway. The difference in modeled flood damages between higher and lower emissions pathways approaches USD 4 billion per year by 2100 (in undiscounted 2014 dollars), suggesting that aggressive GHG emissions reductions could generate significant monetary benefits over the long term in terms of reduced flood damages. Although the downscaled hydrologic data we used have been applied to flood impacts studies elsewhere, this research expands on earlier work to quantify changes in flood risk by linking future flood exposure to assets and damages on a national scale. Our approach relies on a series of simplifications that could ultimately affect damage estimates (e.g., use of statistical downscaling, reliance on a nationwide hydrologic model, and linking damage estimates only to 1 % AEP floods). Although future work is needed to test the sensitivity of our results to these methodological choices, our results indicate that monetary damages from inland flooding could be significantly reduced through substantial GHG mitigation.

  10. Climate change impacts on flood risk and asset damages within mapped 100-year floodplains of the contiguous United States

    Directory of Open Access Journals (Sweden)

    C. Wobus

    2017-12-01

    Full Text Available A growing body of work suggests that the extreme weather events that drive inland flooding are likely to increase in frequency and magnitude in a warming climate, thus potentially increasing flood damages in the future. We use hydrologic projections based on the Coupled Model Intercomparison Project Phase 5 (CMIP5 to estimate changes in the frequency of modeled 1 % annual exceedance probability (1 % AEP, or 100-year flood events at 57 116 stream reaches across the contiguous United States (CONUS. We link these flood projections to a database of assets within mapped flood hazard zones to model changes in inland flooding damages throughout the CONUS over the remainder of the 21st century. Our model generates early 21st century flood damages that reasonably approximate the range of historical observations and trajectories of future damages that vary substantially depending on the greenhouse gas (GHG emissions pathway. The difference in modeled flood damages between higher and lower emissions pathways approaches USD 4 billion per year by 2100 (in undiscounted 2014 dollars, suggesting that aggressive GHG emissions reductions could generate significant monetary benefits over the long term in terms of reduced flood damages. Although the downscaled hydrologic data we used have been applied to flood impacts studies elsewhere, this research expands on earlier work to quantify changes in flood risk by linking future flood exposure to assets and damages on a national scale. Our approach relies on a series of simplifications that could ultimately affect damage estimates (e.g., use of statistical downscaling, reliance on a nationwide hydrologic model, and linking damage estimates only to 1 % AEP floods. Although future work is needed to test the sensitivity of our results to these methodological choices, our results indicate that monetary damages from inland flooding could be significantly reduced through substantial GHG mitigation.

  11. Exploitation of Documented Historical Floods for Achieving Better Flood Defense

    Directory of Open Access Journals (Sweden)

    Slobodan Kolaković

    2016-01-01

    Full Text Available Establishing Base Flood Elevation for a stream network corresponding to a big catchment is feasible by interdisciplinary approach, involving stochastic hydrology, river hydraulics, and computer aided simulations. A numerical model calibrated by historical floods has been exploited in this study. The short presentation of the catchment of the Tisza River in this paper is followed by the overview of historical floods which hit the region in the documented period of 130 years. Several well documented historical floods provided opportunity for the calibration of the chosen numerical model. Once established, the model could be used for investigation of different extreme flood scenarios and to establish the Base Flood Elevation. The calibration has shown that the coefficient of friction in case of the Tisza River is dependent both on the actual water level and on the preceding flood events. The effect of flood plain maintenance as well as the activation of six potential detention ponds on flood mitigation has been examined. Furthermore, the expected maximum water levels have also been determined for the case if the ever observed biggest 1888 flood hit the region again. The investigated cases of flood superposition highlighted the impact of tributary Maros on flood mitigation along the Tisza River.

  12. Evaluation of the Benefit of Flood Reduction by Artificial Groundwater Recharge Lake Operation in a Coastal Area

    Science.gov (United States)

    Chen, Ching-Nuo; Tsai, Chih-Heng

    2017-04-01

    Inundation disasters often occur in the southwestern coastal plains of Taiwan. The coastal plains suffers mostly from land-subsidence, surface water is difficult to be drained during the typhoon period, leading to more severe flood disasters. Global climate warming has become more significant, which in turn has resulted in the increase in amplitude and frequency of climate change related disasters. In addition, climate change also induces a rise in sea water level year by year. The rise in sea water level does not only weakens the function of existing drainage system but also increases tidal levels and storm tide levels, which increases the probability and amount of inundation disasters. The serious land subsidence area at Linbian river basin was selected as the study area. An artificial groundwater recharge lake has been set up in Linbian river basin by Pingtung government. The development area of this lake is 58 hectare and the storage volume is 2.1 million cubic meters (210 × 104m3). The surface water from Linbian basin during a wet season is led into the artificial groundwater recharge lake by water diversion project, and then employ special hydro-geological conditions of the area for groundwater recharge, increase groundwater supply and decrease land subsidence rate, and incidentally some of the flood diversion, detention, reduce flooding. In this study, a Real-time Interactive Inundation Model is applied to simulate different flooding storage volume and gate operations to estimate the benefits of flood mitigation. According to the simulation results, the hydrograph shape, peak-flow reduction and time lag to peak of the flood reduction hydrograph into the lake are apparently different for each case of different gate operation at the same storage volume. Therefore, the effect of flood control and disaster mitigation is different. The flood control and disaster mitigation benefits are evaluated by different operation modes, which provide decision makers to

  13. The Irma-sponge Program: Methodologies For Sustainable Flood Risk Management Along The Rhine and Meuse Rivers

    Science.gov (United States)

    Hooijer, A.; van Os, A. G.

    Recent flood events and socio-economic developments have increased the awareness of the need for improved flood risk management along the Rhine and Meuse Rivers. In response to this, the IRMA-SPONGE program incorporated 13 research projects in which over 30 organisations from all 6 River Basin Countries co-operated. The pro- gram is financed partly by the European INTERREG Rhine-Meuse Activities (IRMA). The main aim of IRMA-SPONGE is defined as: "The development of methodologies and tools to assess the impact of flood risk reduction measures and of land-use and climate change scenarios. This to support the spatial planning process in establish- ing alternative strategies for an optimal realisation of the hydraulic, economical and ecological functions of the Rhine and Meuse River Basins." Further important objec- tives are to promote transboundary co-operation in flood risk management by both scientific and management organisations, and to promote public participation in flood management issues. The projects in the program are grouped in three clusters, looking at measures from different scientific angles. The results of the projects in each cluster have been evaluated to define recommendations for flood risk management; some of these outcomes call for a change to current practices, e.g.: 1. (Flood Risk and Hydrol- ogy cluster): hydrological changes due to climate change exceed those due to further land use change, and are significant enough to necessitate a change in flood risk man- agement strategies if the currently claimed protection levels are to be sustained. 2. (Flood Protection and Ecology cluster): to not only provide flood protection but also enhance the ecological quality of rivers and floodplains, new flood risk management concepts ought to integrate ecological knowledge from start to finish, with a clear perspective on the type of nature desired and the spatial and time scales considered. 3. (Flood Risk Management and Spatial Planning cluster): extreme

  14. How context affects international projects : the cases of Dutch-Romanian cooperation on flood risk management

    NARCIS (Netherlands)

    Vinke-de Kruijf, Joanne; Teodosiu, Carmen; Bressers, Johannes T.A.; Augustijn, Dionysius C.M.

    2011-01-01

    Many countries around the world are confronted with a considerable increase of floods and flood risks. The exchange of knowledge may be beneficial but requires careful consideration of contextual factors. This paper explores the relation between contextual factors and the effectiveness of

  15. Flood Risk Index Assessment in Johor River Basin

    International Nuclear Information System (INIS)

    Ahmad Shakir Mohd Saudi; Hafizan Juahir; Azman Azid; Fazureen Azaman; Ahmad Shakir Mohd Saudi

    2015-01-01

    This study is focusing on constructing the flood risk index in the Johor river basin. The application of statistical methods such as factor analysis (FA), statistical process control (SPC) and artificial neural network (ANN) had revealed the most efficient flood risk index. The result in FA was water level has correlation coefficient of 0.738 and the most practicable variable to be used for the warning alert system. The upper control limits (UCL) for the water level in the river basin Johor is 4.423 m and the risk index for the water level has been set by this method consisting of 0-100.The accuracy of prediction has been evaluated by using ANN and the accuracy of the test result was R"2 = 0.96408 with RMSE= 2.5736. The future prediction for UCL in Johor river basin has been predicted and the value was 3.75 m. This model can shows the current and future prediction for flood risk index in the Johor river basin and can help local authorities for flood control and prevention of the state of Johor. (author)

  16. Public perception of flood risks, flood forecasting and mitigation

    Directory of Open Access Journals (Sweden)

    M. Brilly

    2005-01-01

    Full Text Available A multidisciplinary and integrated approach to the flood mitigation decision making process should provide the best response of society in a flood hazard situation including preparation works and post hazard mitigation. In Slovenia, there is a great lack of data on social aspects and public response to flood mitigation measures and information management. In this paper, two studies of flood perception in the Slovenian town Celje are represented. During its history, Celje was often exposed to floods, the most recent serious floods being in 1990 and in 1998, with a hundred and fifty return period and more than ten year return period, respectively. Two surveys were conducted in 1997 and 2003, with 157 participants from different areas of the town in the first, and 208 in the second study, aiming at finding the general attitude toward the floods. The surveys revealed that floods present a serious threat in the eyes of the inhabitants, and that the perception of threat depends, to a certain degree, on the place of residence. The surveys also highlighted, among the other measures, solidarity and the importance of insurance against floods.

  17. Fragility analysis of flood protection structures in earthquake and flood prone areas around Cologne, Germany for multi-hazard risk assessment

    Science.gov (United States)

    Tyagunov, Sergey; Vorogushyn, Sergiy; Munoz Jimenez, Cristina; Parolai, Stefano; Fleming, Kevin; Merz, Bruno; Zschau, Jochen

    2013-04-01

    The work presents a methodology for fragility analyses of fluvial earthen dikes in earthquake and flood prone areas. Fragility estimates are being integrated into the multi-hazard (earthquake-flood) risk analysis being undertaken within the framework of the EU FP7 project MATRIX (New Multi-Hazard and Multi-Risk Assessment Methods for Europe) for the city of Cologne, Germany. Scenarios of probable cascading events due to the earthquake-triggered failure of flood protection dikes and the subsequent inundation of surroundings are analyzed for the area between the gauges Andernach and Düsseldorf along the Rhine River. Along this river stretch, urban areas are partly protected by earthen dikes, which may be prone to failure during exceptional floods and/or earthquakes. The seismic fragility of the dikes is considered in terms of liquefaction potential (factor of safety), estimated by the use of the simplified procedure of Seed and Idriss. It is assumed that initiation of liquefaction at any point throughout the earthen dikes' body corresponds to the failure of the dike and, therefore, this should be taken into account for the flood risk calculations. The estimated damage potential of such structures is presented as a two-dimensional surface (as a function of seismic hazard and water level). Uncertainties in geometrical and geotechnical dike parameters are considered within the framework of Monte Carlo simulations. Taking into consideration the spatial configuration of the existing flood protection system within the area under consideration, seismic hazard curves (in terms of PGA) are calculated for sites along the river segment of interest at intervals of 1 km. The obtained estimates are used to calculate the flood risk when considering the temporal coincidence of seismic and flood events. Changes in flood risk for the considered hazard cascade scenarios are quantified and compared to the single-hazard scenarios.

  18. Flood triggering in Switzerland: the role of daily to monthly preceding precipitation

    Science.gov (United States)

    Froidevaux, P.; Schwanbeck, J.; Weingartner, R.; Chevalier, C.; Martius, O.

    2015-09-01

    Determining the role of different precipitation periods for peak discharge generation is crucial for both projecting future changes in flood probability and for short- and medium-range flood forecasting. In this study, catchment-averaged daily precipitation time series are analyzed prior to annual peak discharge events (floods) in Switzerland. The high number of floods considered - more than 4000 events from 101 catchments have been analyzed - allows to derive significant information about the role of antecedent precipitation for peak discharge generation. Based on the analysis of precipitation times series, a new separation of flood-related precipitation periods is proposed: (i) the period 0 to 1 day before flood days, when the maximum flood-triggering precipitation rates are generally observed, (ii) the period 2 to 3 days before flood days, when longer-lasting synoptic situations generate "significantly higher than normal" precipitation amounts, and (iii) the period from 4 days to 1 month before flood days when previous wet episodes may have already preconditioned the catchment. The novelty of this study lies in the separation of antecedent precipitation into the precursor antecedent precipitation (4 days before floods or earlier, called PRE-AP) and the short range precipitation (0 to 3 days before floods, a period when precipitation is often driven by one persistent weather situation like e.g., a stationary low-pressure system). A precise separation of "antecedent" and "peak-triggering" precipitation is not attempted. Instead, the strict definition of antecedent precipitation periods permits a direct comparison of all catchments. The precipitation accumulating 0 to 3 days before an event is the most relevant for floods in Switzerland. PRE-AP precipitation has only a weak and region-specific influence on flood probability. Floods were significantly more frequent after wet PRE-AP periods only in the Jura Mountains, in the western and eastern Swiss plateau, and at

  19. Flood Mapping and Flood Dynamics of the Mekong Delta: ENVISAT-ASAR-WSM Based Time Series Analyses

    Directory of Open Access Journals (Sweden)

    Stefan Dech

    2013-02-01

    Full Text Available Satellite remote sensing is a valuable tool for monitoring flooding. Microwave sensors are especially appropriate instruments, as they allow the differentiation of inundated from non-inundated areas, regardless of levels of solar illumination or frequency of cloud cover in regions experiencing substantial rainy seasons. In the current study we present the longest synthetic aperture radar-based time series of flood and inundation information derived for the Mekong Delta that has been analyzed for this region so far. We employed overall 60 Envisat ASAR Wide Swath Mode data sets at a spatial resolution of 150 meters acquired during the years 2007–2011 to facilitate a thorough understanding of the flood regime in the Mekong Delta. The Mekong Delta in southern Vietnam comprises 13 provinces and is home to 18 million inhabitants. Extreme dry seasons from late December to May and wet seasons from June to December characterize people’s rural life. In this study, we show which areas of the delta are frequently affected by floods and which regions remain dry all year round. Furthermore, we present which areas are flooded at which frequency and elucidate the patterns of flood progression over the course of the rainy season. In this context, we also examine the impact of dykes on floodwater emergence and assess the relationship between retrieved flood occurrence patterns and land use. In addition, the advantages and shortcomings of ENVISAT ASAR-WSM based flood mapping are discussed. The results contribute to a comprehensive understanding of Mekong Delta flood dynamics in an environment where the flow regime is influenced by the Mekong River, overland water-flow, anthropogenic floodwater control, as well as the tides.

  20. Spillways Scheduling for Flood Control of Three Gorges Reservoir Using Mixed Integer Linear Programming Model

    Directory of Open Access Journals (Sweden)

    Maoyuan Feng

    2014-01-01

    Full Text Available This study proposes a mixed integer linear programming (MILP model to optimize the spillways scheduling for reservoir flood control. Unlike the conventional reservoir operation model, the proposed MILP model specifies the spillways status (including the number of spillways to be open and the degree of the spillway opened instead of reservoir release, since the release is actually controlled by using the spillway. The piecewise linear approximation is used to formulate the relationship between the reservoir storage and water release for a spillway, which should be open/closed with a status depicted by a binary variable. The control order and symmetry rules of spillways are described and incorporated into the constraints for meeting the practical demand. Thus, a MILP model is set up to minimize the maximum reservoir storage. The General Algebraic Modeling System (GAMS and IBM ILOG CPLEX Optimization Studio (CPLEX software are used to find the optimal solution for the proposed MILP model. The China’s Three Gorges Reservoir, whose spillways are of five types with the total number of 80, is selected as the case study. It is shown that the proposed model decreases the flood risk compared with the conventional operation and makes the operation more practical by specifying the spillways status directly.

  1. Multi-model ensemble projections of European river floods and high flows at 1.5, 2, and 3 degree global warming

    Science.gov (United States)

    Thober, S.; Kumar, R.; Wanders, N.; Marx, A.; Pan, M.; Rakovec, O.; Samaniego, L. E.; Sheffield, J.; Wood, E. F.; Zink, M.

    2017-12-01

    Severe river floods often result in huge economic losses and fatalities. Since 1980, almost 1500 such events have been reported in Europe. This study investigates climate change impacts on European floods under 1.5, 2, and 3 K global warming. The impacts are assessed employing a multi-model ensemble containing three hydrologic models (HMs: mHM, Noah-MP, PCR-GLOBWB) forced by five CMIP5 General Circulation Models (GCMs) under three Representative Concentration Pathways (RCPs 2.6, 6.0, and 8.5). This multi-model ensemble is unprecedented with respect to the combination of its size (45 realisations) and its spatial resolution, which is 5 km over entire Europe. Climate change impacts are quantified for high flows and flood events, represented by 10% exceedance probability and annual maxima of daily streamflow, respectively. The multi-model ensemble points to the Mediterranean region as a hotspot of changes with significant decrements in high flows from -11% at 1.5 K up to -30% at 3 K global warming mainly resulting from reduced precipitation. Small changes (< ±10%) are observed for river basins in Central Europe and the British Isles under different levels of warming. Projected higher annual precipitation increases high flows in Scandinavia, but reduced snow water equivalent decreases flood events in this region. The contribution by the GCMs to the overall uncertainties of the ensemble is in general higher than that by the HMs. The latter, however, have a substantial share of the overall uncertainty and exceed GCM uncertainty in the Mediterranean and Scandinavia. Adaptation measures for limiting the impacts of global warming could be similar under 1.5 K and 2 K global warming, but has to account for significantly higher changes under 3 K global warming.

  2. Guidance of Autonomous Amphibious Vehicles for Flood Rescue Support

    Directory of Open Access Journals (Sweden)

    Shankarachary Ragi

    2013-01-01

    Full Text Available We develop a path-planning algorithm to guide autonomous amphibious vehicles (AAVs for flood rescue support missions. Specifically, we develop an algorithm to control multiple AAVs to reach/rescue multiple victims (also called targets in a flood scenario in 2D, where the flood water flows across the scene and the targets move (drifted by the flood water along the flood stream. A target is said to be rescued if an AAV lies within a circular region of a certain radius around the target. The goal is to control the AAVs such that each target gets rescued while optimizing a certain performance objective. The algorithm design is based on the theory of partially observable Markov decision process (POMDP. In practice, POMDP problems are hard to solve exactly, so we use an approximation method called nominal belief-state optimization (NBO. We compare the performance of the NBO approach with a greedy approach.

  3. Understanding stakeholder preferences for flood adaptation alternatives with natural capital implications

    Directory of Open Access Journals (Sweden)

    Jonathon R. Loos

    2016-09-01

    Full Text Available Inland flood risks are defined by a range of environmental and social factors, including land use and floodplain management. Shifting patterns of storm intensity and precipitation, attributed to climate change, are exacerbating flood risk in regions across North America. Strategies for adapting to growing flood risks and climate change must account for a community's specific vulnerabilities, and its local economic, environmental, and social conditions. Through a stakeholder-engaged methodology, we designed an interactive decision exercise to enable stakeholders to evaluate alternatives for addressing specific community flood vulnerabilities. We used a multicriteria framework to understand what drives stakeholder preferences for flood mitigation and adaptation alternatives, including ecosystem-based projects. Results indicated strong preferences for some ecosystem-based projects that utilize natural capital, generated a useful discussion on the role of individual values in driving decisions and a critique of local environmental and hazard planning procedure, and uncovered support for a river management alternative that had previously been considered socially infeasible. We conclude that a multicriteria decision framework may help ensure that the multiple benefit qualities of natural capital projects are considered by decision makers. Application of a utility function can demonstrate the role of individual decision-maker values in decision outcomes and help illustrate why one alternative may be a better choice than another. Although designing an efficient and accurate multicriteria exercise is quite challenging and often data intensive, we imagine that this method is applicable elsewhere. It may be especially suitable to group decisions that involve varying levels of expertise and competing values, as is often the case in planning for the ecological and human impacts of climate change.

  4. A Database of Historical Information on Landslides and Floods in Italy

    Science.gov (United States)

    Guzzetti, F.; Tonelli, G.

    2003-04-01

    For the past 12 years we have maintained and updated a database of historical information on landslides and floods in Italy, known as the National Research Council's AVI (Damaged Urban Areas) Project archive. The database was originally designed to respond to a specific request of the Minister of Civil Protection, and was aimed at helping the regional assessment of landslide and flood risk in Italy. The database was first constructed in 1991-92 to cover the period 1917 to 1990. Information of damaging landslide and flood event was collected by searching archives, by screening thousands of newspaper issues, by reviewing the existing technical and scientific literature on landslides and floods in Italy, and by interviewing landslide and flood experts. The database was then updated chiefly through the analysis of hundreds of newspaper articles, and it now covers systematically the period 1900 to 1998, and non-systematically the periods 1900 to 1916 and 1999 to 2002. Non systematic information on landslide and flood events older than 20th century is also present in the database. The database currently contains information on more than 32,000 landslide events occurred at more than 25,700 sites, and on more than 28,800 flood events occurred at more than 15,600 sites. After a brief outline of the history and evolution of the AVI Project archive, we present and discuss: (a) the present structure of the database, including the hardware and software solutions adopted to maintain, manage, use and disseminate the information stored in the database, (b) the type and amount of information stored in the database, including an estimate of its completeness, and (c) examples of recent applications of the database, including a web-based GIS systems to show the location of sites historically affected by landslides and floods, and an estimate of geo-hydrological (i.e., landslide and flood) risk in Italy based on the available historical information.

  5. A Theory on Urban Resilience to Floods - A Basis for Alternative Planning Practices

    Directory of Open Access Journals (Sweden)

    Kuei-Hsien Liao

    2012-12-01

    Full Text Available River cities require a management approach based on resilience to floods rather than on resistance. Resisting floods by means of levees, dams, and channelization neglects inherent uncertainties arising from human-nature couplings and fails to address the extreme events that are expected to increase with climate change, and is thereby not a reliable approach to long-term flood safety. By applying resilience theory to address system persistence through changes, I develop a theory on "urban resilience to floods" as an alternative framework for urban flood hazard management. Urban resilience to floods is defined as a city's capacity to tolerate flooding and to reorganize should physical damage and socioeconomic disruption occur, so as to prevent deaths and injuries and maintain current socioeconomic identity. It derives from living with periodic floods as learning opportunities to prepare the city for extreme ones. The theory of urban resilience to floods challenges the conventional wisdom that cities cannot live without flood control, which in effect erodes resilience. To operationalize the theory for planning practice, a surrogate measure - the percent floodable area - is developed for assessing urban resilience to floods. To enable natural floodplain functions to build urban resilience to floods, flood adaptation is advocated in order to replace flood control for mitigating flood hazards.

  6. High-resolution urban flood modelling - a joint probability approach

    Science.gov (United States)

    Hartnett, Michael; Olbert, Agnieszka; Nash, Stephen

    2017-04-01

    (Divoky et al., 2005). Nevertheless, such events occur and in Ireland alone there are several cases of serious damage due to flooding resulting from a combination of high sea water levels and river flows driven by the same meteorological conditions (e.g. Olbert et al. 2015). A November 2009 fluvial-coastal flooding of Cork City bringing €100m loss was one such incident. This event was used by Olbert et al. (2015) to determine processes controlling urban flooding and is further explored in this study to elaborate on coastal and fluvial flood mechanisms and their roles in controlling water levels. The objective of this research is to develop a methodology to assess combined effect of multiple source flooding on flood probability and severity in urban areas and to establish a set of conditions that dictate urban flooding due to extreme climatic events. These conditions broadly combine physical flood drivers (such as coastal and fluvial processes), their mechanisms and thresholds defining flood severity. The two main physical processes controlling urban flooding: high sea water levels (coastal flooding) and high river flows (fluvial flooding), and their threshold values for which flood is likely to occur, are considered in this study. Contribution of coastal and fluvial drivers to flooding and their impacts are assessed in a two-step process. The first step involves frequency analysis and extreme value statistical modelling of storm surges, tides and river flows and ultimately the application of joint probability method to estimate joint exceedence return periods for combination of surges, tide and river flows. In the second step, a numerical model of Cork Harbour MSN_Flood comprising a cascade of four nested high-resolution models is used to perform simulation of flood inundation under numerous hypothetical coastal and fluvial flood scenarios. The risk of flooding is quantified based on a range of physical aspects such as the extent and depth of inundation (Apel et al

  7. Projected 21st century coastal flooding in the Southern California Bight. Part 2: Tools for assessing climate change-driven coastal hazards and socio-economic impacts

    Science.gov (United States)

    Erikson, Li; Barnard, Patrick; O'Neill, Andrea; Wood, Nathan J.; Jones, Jeanne M.; Finzi Hart, Juliette; Vitousek, Sean; Limber, Patrick; Hayden, Maya; Fitzgibbon, Michael; Lovering, Jessica; Foxgrover, Amy C.

    2018-01-01

    This paper is the second of two that describes the Coastal Storm Modeling System (CoSMoS) approach for quantifying physical hazards and socio-economic hazard exposure in coastal zones affected by sea-level rise and changing coastal storms. The modelling approach, presented in Part 1, downscales atmospheric global-scale projections to local scale coastal flood impacts by deterministically computing the combined hazards of sea-level rise, waves, storm surges, astronomic tides, fluvial discharges, and changes in shoreline positions. The method is demonstrated through an application to Southern California, United States, where the shoreline is a mix of bluffs, beaches, highly managed coastal communities, and infrastructure of high economic value. Results show that inclusion of 100-year projected coastal storms will increase flooding by 9–350% (an additional average 53.0 ± 16.0 km2) in addition to a 25–500 cm sea-level rise. The greater flooding extents translate to a 55–110% increase in residential impact and a 40–90% increase in building replacement costs. To communicate hazards and ranges in socio-economic exposures to these hazards, a set of tools were collaboratively designed and tested with stakeholders and policy makers; these tools consist of two web-based mapping and analytic applications as well as virtual reality visualizations. To reach a larger audience and enhance usability of the data, outreach and engagement included workshop-style trainings for targeted end-users and innovative applications of the virtual reality visualizations.

  8. Spent Nuclear Fuel project interface control plan

    International Nuclear Information System (INIS)

    Reilly, M.A.

    1995-01-01

    This implementation process philosophy is in keeping with the ongoing reengineering of the WHC Controlled Manuals to achieve interface control within the SNF Project. This plan applies to all SNF Project sub-project to sub-project, and sub-project to exteranl (both on and off the Hanford Site) interfaces

  9. Interactions between the flooding regime and floodplain grasslands in the Tana River Delta, in Kenya

    Science.gov (United States)

    Leauthaud, Crystele; Musila, Winfred; Duvail, Stéphanie; Kergoat, Laurent; Hiernaux, Pierre; Grippa, Manuela; Albergel, Jean

    2017-04-01

    The floodplain grasslands of the Tana River Delta, located on the East African coast in Kenya, form part of an intertwined socio-ecological deltaic system of high biodiversity value that delivers numerous goods and services. Mainly composed of Echinochloa stagnina (Retz) P. Beauv., a high-value forage species, this ecosystem is the major dry-season grazing grounds of the local pastoralist communities. The construction of hydroelectric infrastructure has led to a modification of the flooding regime. The impacts of the resulting reduction of floods in the deltaic zone on ecosystem properties and services still need to be assessed. In such a perspective, this study characterizes the link between the flooding regime of the Tana River and the growth pattern of its floodplain grassland. Aboveground dry phytomass was sampled for 15 months under a wide variety of naturally flooded and non-flooded conditions and controlled irrigation and cutting frequency treatments. Annual aboveground dry phytomass attained high values between 11 T.ha-1 and 32 T.ha-1 and annual net primary production of the grasslands reached 35 T.ha-1.year-1. Growth rates clearly depended on the flooding regime, management and climate conditions and were on average more than twice as fast during, and 50% faster after the floods, relative to pre-flood conditions. A plant growth model allowed testing the effect of different flooding regimes on plant productivity, confirming very low productivity in the absence of floods. These results suggest that rangeland and water management for the Tana River deltaic wetlands are tightly linked. The projected construction of another dam could lead to a reduction of flood extent and period and a decrease of grassland productivity and growth duration. Mitigation of this type of negative impacts, which will have direct and adverse consequences for the pastoralist communities as well as on the delivery of other goods and services, needs to be undertaken.

  10. Recommendations for the user-specific enhancement of flood maps

    Directory of Open Access Journals (Sweden)

    V. Meyer

    2012-05-01

    Full Text Available The European Union Floods Directive requires the establishment of flood maps for high risk areas in all European member states by 2013. However, the current practice of flood mapping in Europe still shows some deficits. Firstly, flood maps are frequently seen as an information tool rather than a communication tool. This means that, for example, local stocks of knowledge are not incorporated. Secondly, the contents of flood maps often do not match the requirements of the end-users. Finally, flood maps are often designed and visualised in a way that cannot be easily understood by residents at risk and/or that is not suitable for the respective needs of public authorities in risk and event management. The RISK MAP project examined how end-user participation in the mapping process may be used to overcome these barriers and enhance the communicative power of flood maps, fundamentally increasing their effectiveness.

    Based on empirical findings from a participatory approach that incorporated interviews, workshops and eye-tracking tests, conducted in five European case studies, this paper outlines recommendations for user-specific enhancements of flood maps. More specific, recommendations are given with regard to (1 appropriate stakeholder participation processes, which allow incorporating local knowledge and preferences, (2 the improvement of the contents of flood maps by considering user-specific needs and (3 the improvement of the visualisation of risk maps in order to produce user-friendly and understandable risk maps for the user groups concerned. Furthermore, "idealised" maps for different user groups are presented: for strategic planning, emergency management and the public.

  11. Coupled hydrogeomorphic and woody-seedling responses to controlled flood releases in a dryland river

    Science.gov (United States)

    Wilcox, Andrew C.; Shafroth, Patrick B.

    2013-01-01

    Interactions among flow, geomorphic processes, and riparian vegetation can strongly influence both channel form and vegetation communities. To investigate such interactions, we took advantage of a series of dam-managed flood releases that were designed in part to maintain a native riparian woodland system on a sand-bed, dryland river, the Bill Williams River, Arizona, USA. Our resulting multiyear flow experiment examined differential mortality among native and nonnative riparian seedlings, associated flood hydraulics and geomorphic changes, and the temporal evolution of feedbacks among vegetation, channel form, and hydraulics. We found that floods produced geomorphic and vegetation responses that varied with distance downstream of a dam, with scour and associated seedling mortality closer to the dam and aggradation and burial-induced mortality in a downstream reach. We also observed significantly greater mortality among nonnative tamarisk (Tamarix) seedlings than among native willow (Salix gooddingii) seedlings, reflecting the greater first-year growth of willow relative to tamarisk. When vegetation was small early in our study period, the effects of vegetation on flood hydraulics and on mediating flood-induced channel change were minimal. Vegetation growth in subsequent years resulted in stronger feedbacks, such that vegetation's stabilizing effect on bars and its drag effect on flow progressively increased, muting the geomorphic effects of a larger flood release. These observations suggest that the effectiveness of floods in producing geomorphic and ecological changes varies not only as a function of flood magnitude and duration, but also of antecedent vegetation density and size.

  12. Weighted normalized risk factor for floods risk assessment

    Directory of Open Access Journals (Sweden)

    Ashraf Mohamed Elmoustafa

    2012-12-01

    Full Text Available Multi Criteria Analysis (MCA describes any structured approach used to determine overall preferences among alternative options, where options accomplish certain or several objectives. The flood protection of properties is a highly important issue due to the damage, danger and other hazards associated to it to human life, properties, and environment. To determine the priority of execution of protection works for any project, many aspects should be considered in order to decide the areas to start the data collection and analysis with. Multi criteria analysis techniques were tested and evaluated for the purpose of flood risk assessment, hydro-morphological parameters were used in this analysis. Finally a suitable technique was chosen and tested to be adopted as a mark of flood risk level and results were presented.

  13. Flood risk in a changing world - a coupled transdisciplinary modelling framework for flood risk assessment in an Alpine study area

    Science.gov (United States)

    Huttenlau, Matthias; Schneeberger, Klaus; Winter, Benjamin; Pazur, Robert; Förster, Kristian; Achleitner, Stefan; Bolliger, Janine

    2017-04-01

    Devastating flood events have caused substantial economic damage across Europe during past decades. Flood risk management has therefore become a topic of crucial interest across state agencies, research communities and the public sector including insurances. There is consensus that mitigating flood risk relies on impact assessments which quantitatively account for a broad range of aspects in a (changing) environment. Flood risk assessments which take into account the interaction between the drivers climate change, land-use change and socio-economic change might bring new insights to the understanding of the magnitude and spatial characteristic of flood risks. Furthermore, the comparative assessment of different adaptation measures can give valuable information for decision-making. With this contribution we present an inter- and transdisciplinary research project aiming at developing and applying such an impact assessment relying on a coupled modelling framework for the Province of Vorarlberg in Austria. Stakeholder engagement ensures that the final outcomes of our study are accepted and successfully implemented in flood management practice. The study addresses three key questions: (i) What are scenarios of land- use and climate change for the study area? (ii) How will the magnitude and spatial characteristic of future flood risk change as a result of changes in climate and land use? (iii) Are there spatial planning and building-protection measures which effectively reduce future flood risk? The modelling framework has a modular structure comprising modules (i) climate change, (ii) land-use change, (iii) hydrologic modelling, (iv) flood risk analysis, and (v) adaptation measures. Meteorological time series are coupled with spatially explicit scenarios of land-use change to model runoff time series. The runoff time series are combined with impact indicators such as building damages and results are statistically assessed to analyse flood risk scenarios. Thus, the

  14. Flooding and mental health: a systematic mapping review.

    Science.gov (United States)

    Fernandez, Ana; Black, John; Jones, Mairwen; Wilson, Leigh; Salvador-Carulla, Luis; Astell-Burt, Thomas; Black, Deborah

    2015-01-01

    Floods are the most common type of global natural disaster. Floods have a negative impact on mental health. Comprehensive evaluation and review of the literature are lacking. To systematically map and review available scientific evidence on mental health impacts of floods caused by extended periods of heavy rain in river catchments. We performed a systematic mapping review of published scientific literature in five languages for mixed studies on floods and mental health. PUBMED and Web of Science were searched to identify all relevant articles from 1994 to May 2014 (no restrictions). The electronic search strategy identified 1331 potentially relevant papers. Finally, 83 papers met the inclusion criteria. Four broad areas are identified: i) the main mental health disorders-post-traumatic stress disorder, depression and anxiety; ii] the factors associated with mental health among those affected by floods; iii) the narratives associated with flooding, which focuses on the long-term impacts of flooding on mental health as a consequence of the secondary stressors; and iv) the management actions identified. The quantitative and qualitative studies have consistent findings. However, very few studies have used mixed methods to quantify the size of the mental health burden as well as exploration of in-depth narratives. Methodological limitations include control of potential confounders and short-term follow up. Floods following extreme events were excluded from our review. Although the level of exposure to floods has been systematically associated with mental health problems, the paucity of longitudinal studies and lack of confounding controls precludes strong conclusions. We recommend that future research in this area include mixed-method studies that are purposefully designed, using more rigorous methods. Studies should also focus on vulnerable groups and include analyses of policy and practical responses.

  15. Flooding and Mental Health: A Systematic Mapping Review

    Science.gov (United States)

    Fernandez, Ana; Black, John; Jones, Mairwen; Wilson, Leigh; Salvador-Carulla, Luis; Astell-Burt, Thomas; Black, Deborah

    2015-01-01

    Background Floods are the most common type of global natural disaster. Floods have a negative impact on mental health. Comprehensive evaluation and review of the literature are lacking. Objective To systematically map and review available scientific evidence on mental health impacts of floods caused by extended periods of heavy rain in river catchments. Methods We performed a systematic mapping review of published scientific literature in five languages for mixed studies on floods and mental health. PUBMED and Web of Science were searched to identify all relevant articles from 1994 to May 2014 (no restrictions). Results The electronic search strategy identified 1331 potentially relevant papers. Finally, 83 papers met the inclusion criteria. Four broad areas are identified: i) the main mental health disorders—post-traumatic stress disorder, depression and anxiety; ii] the factors associated with mental health among those affected by floods; iii) the narratives associated with flooding, which focuses on the long-term impacts of flooding on mental health as a consequence of the secondary stressors; and iv) the management actions identified. The quantitative and qualitative studies have consistent findings. However, very few studies have used mixed methods to quantify the size of the mental health burden as well as exploration of in-depth narratives. Methodological limitations include control of potential confounders and short-term follow up. Limitations Floods following extreme events were excluded from our review. Conclusions Although the level of exposure to floods has been systematically associated with mental health problems, the paucity of longitudinal studies and lack of confounding controls precludes strong conclusions. Implications We recommend that future research in this area include mixed-method studies that are purposefully designed, using more rigorous methods. Studies should also focus on vulnerable groups and include analyses of policy and practical

  16. A Mediterranean case study of flood evolution: the Metropolitan Area of Barcelona

    Science.gov (United States)

    Llasat, Maria Carmen; Gilabert, Joan; Llasat-Botija, Montserrat; Cortès, Maria; Marcos, Raül; Martín-Vide, Juan Pedro; Turco, Marco; Falcón, Lluis

    2016-04-01

    Flood risk changes in Mediterranean Region integrate multiple factors, some of them related with the hazard (i.e. rainfall intensity), the vulnerability and exposure (i.e. population or assets), feedback processes that affect both hazard and vulnerability (i.e. urbanization of flood prone areas), mitigation and adaptation measures (i.e. rainwater tanks or early warning systems), and the available information used to estimate flood events (i.e. newspapers or gauged data). Flood events in the West Mediterranean region are usually produced as a consequence of very intense and local precipitation, mainly recorded on late summer and autumn that can give place to flash-floods in little torrential rivers (usually non-permanent flows) or urban floods. The Metropolitan Area of Barcelona (AMB), Spain, constitutes a good paradigm of a Mediterranean coast region, with strong urbanization of flood prone areas and high population density in an area crossed by numerous streams. The AMB is constituted by 36 municipalities with a total population above 3.200.000 inhabitants in an extension of 636 km². The major part of the population is concentrated between the Besós River and the Llobregat River, the Littoral Range and the Mediterranean Sea. Although both rivers have experienced catastrophic flood events (i.e. 25 September 1962, 815 deaths; 19-23 September 1971, 19 deaths; October 1987, 8 deaths), the most frequent situation is related with floods in non-permanent streams. Their main impacts are consequence of drainage and runoff problems and can affect both urban and rural areas. This contribution explores the evolution of land uses, population and precipitation from the middle of the 20th century until now, and how these changes have affected (or not), the flood risk. To do it, daily and sub-daily rainfall series, discharge series for the Llobregat and Besós Rivers, population data and land use changes have been analyzed. Future precipitation projections provided by an

  17. Overview of Levee Setback Projects and Benefits

    Science.gov (United States)

    2017-07-31

    other life-history stages of fish and other aquatic organisms . Levees can also increase the frequency of common floods in the floodplain where they...projects is the use of flood- borne sediments to supplement fertilizers in flooded farm fields. Historically, floodwaters were a significant source of

  18. Resettlement associated with hydro projects in China

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    The flow rates of Chinese rivers are subject to major seasonal fluctuations, and as a result large reservoirs have to be constructed for flood control, irrigation, and power generation. As most of the river valleys are densely populated, the relocation and resettlement of people from the reservoir areas are major but unavoidable problems to be addressed in building hydro projects in China. (author)

  19. Microphonics control for Project X

    International Nuclear Information System (INIS)

    Schappert, W.; Barbanotti, S.; Branlard, J.; Cancelo, G.; Carcagno, R.; Chase, B.; Champion, M.; Gonin, I.; Klebaner, A.; Orris, D.; Pischalnikov, Y.

    2011-01-01

    The proposed multi-MW Project X facility at Fermilab will employ cavities with bandwidths as narrow as 20 Hz. This combination of high RF power with narrow bandwidths combined requires careful attention to detuning control if these cavities are to be operated successfully. Detuning control for Projects X will require a coordinated effort between the groups responsible for various machine subsystems. Considerable progress in this area has been made over the past year. Detuning levels in the Project X cavities, specifically the Low and High β 650 MHz elliptical types, can have a significant impact on the overall cost of the project. The narrow bandwidths, and the high RF Power requirements, and the large number of these cavities mean that careful attention to detuning control will be required if these cavities are to operate successfully. Limiting cavity detuning in Project X will require a coordinated effort between the groups responsible for various subsystems of the planned machine. Considerable progress towards this goal has been made by each of these groups over the past year.

  20. Microphonics control for Project X

    Energy Technology Data Exchange (ETDEWEB)

    Schappert, W.; Barbanotti, S.; Branlard, J.; Cancelo, G.; Carcagno, R.; Chase, B.; Champion, M.; Gonin, I.; Klebaner, A.; Orris, D.; Pischalnikov, Y.; /Fermilab

    2011-03-01

    The proposed multi-MW Project X facility at Fermilab will employ cavities with bandwidths as narrow as 20 Hz. This combination of high RF power with narrow bandwidths combined requires careful attention to detuning control if these cavities are to be operated successfully. Detuning control for Projects X will require a coordinated effort between the groups responsible for various machine subsystems. Considerable progress in this area has been made over the past year. Detuning levels in the Project X cavities, specifically the Low and High {beta} 650 MHz elliptical types, can have a significant impact on the overall cost of the project. The narrow bandwidths, and the high RF Power requirements, and the large number of these cavities mean that careful attention to detuning control will be required if these cavities are to operate successfully. Limiting cavity detuning in Project X will require a coordinated effort between the groups responsible for various subsystems of the planned machine. Considerable progress towards this goal has been made by each of these groups over the past year.

  1. A large-scale simulation of climate change effects on flood regime - A case study for the Alabama-Coosa-Tallapoosa River Basin

    Science.gov (United States)

    Dullo, T. T.; Gangrade, S.; Marshall, R.; Islam, S. R.; Ghafoor, S. K.; Kao, S. C.; Kalyanapu, A. J.

    2017-12-01

    The damage and cost of flooding are continuously increasing due to climate change and variability, which compels the development and advance of global flood hazard models. However, due to computational expensiveness, evaluation of large-scale and high-resolution flood regime remains a challenge. The objective of this research is to use a coupled modeling framework that consists of a dynamically downscaled suite of eleven Coupled Model Intercomparison Project Phase 5 (CMIP5) climate models, a distributed hydrologic model called DHSVM, and a computational-efficient 2-dimensional hydraulic model called Flood2D-GPU to study the impacts of climate change on flood regime in the Alabama-Coosa-Tallapoosa (ACT) River Basin. Downscaled meteorologic forcings for 40 years in the historical period (1966-2005) and 40 years in the future period (2011-2050) were used as inputs to drive the calibrated DHSVM to generate annual maximum flood hydrographs. These flood hydrographs along with 30-m resolution digital elevation and estimated surface roughness were then used by Flood2D-GPU to estimate high-resolution flood depth, velocities, duration, and regime. Preliminary results for the Conasauga river basin (an upper subbasin within ACT) indicate that seven of the eleven climate projections show an average increase of 25 km2 in flooded area (between historic and future projections). Future work will focus on illustrating the effects of climate change on flood duration and area for the entire ACT basin.

  2. Flood risk management in Italy: challenges and opportunities for the implementation of the EU Floods Directive (2007/60/EC)

    Science.gov (United States)

    Mysiak, J.; Testella, F.; Bonaiuto, M.; Carrus, G.; De Dominicis, S.; Ganucci Cancellieri, U.; Firus, K.; Grifoni, P.

    2013-11-01

    Italy's recent history is punctuated with devastating flood disasters claiming high death toll and causing vast but underestimated economic, social and environmental damage. The responses to major flood and landslide disasters such as the Polesine (1951), Vajont (1963), Firenze (1966), Valtelina (1987), Piedmont (1994), Crotone (1996), Sarno (1998), Soverato (2000), and Piedmont (2000) events have contributed to shaping the country's flood risk governance. Insufficient resources and capacity, slow implementation of the (at that time) novel risk prevention and protection framework, embodied in the law 183/89 of 18 May 1989, increased the reliance on the response and recovery operations of the civil protection. As a result, the importance of the Civil Protection Mechanism and the relative body of norms and regulation developed rapidly in the 1990s. In the aftermath of the Sarno (1998) and Soverato (2000) disasters, the Department for Civil Protection (DCP) installed a network of advanced early warning and alerting centres, the cornerstones of Italy's preparedness for natural hazards and a best practice worth following. However, deep convective clouds, not uncommon in Italy, producing intense rainfall and rapidly developing localised floods still lead to considerable damage and loss of life that can only be reduced by stepping up the risk prevention efforts. The implementation of the EU Floods Directive (2007/60/EC) provides an opportunity to revise the model of flood risk governance and confront the shortcomings encountered during more than 20 yr of organised flood risk management. This brief communication offers joint recommendations towards this end from three projects funded by the 2nd CRUE ERA-NET (http://www.crue-eranet.net/) Funding Initiative: FREEMAN, IMRA and URFlood.

  3. Surfactant loss control in chemical flooding spectroscopic and calorimetric study of adsorption and precipitation on reservoir minerals. Annual report, September 30, 1993--September 30, 1994

    Energy Technology Data Exchange (ETDEWEB)

    Somasundaran, P.

    1995-06-01

    The aim of this project is to elucidate the mechanisms underlying adsorption and surface precipitation of flooding surfactants on reservoir minerals. Effect of surfactant structure, surfactant combinations, other inorganic and polymeric species is being studied. A multi-pronged approach consisting of micro and nano spectroscopy, microcalorimetry, electrokinetics, surface tension and wettability is used to achieve the goals. The results of this study should help in controlling surfactant loss in chemical flooding and also in developing optimum structures and conditions for efficient chemical flooding processes. During the second year of this three year contract, adsorption/desorption of single surfactants and select surfactant mixtures on alumina and silica was studied. Surfactants studied include the anionic sodium dodecyl sulfate (SDS), cationic tetradecyl trimethyl ammonium chloride (TTAC), nonionic pentadecylethoxylated nonyl phenol (NP-15) and the nonionic octaethylene glycol n-dodecyl ether (C{sub 12}EO{sub 8}) of varying hydrocarbon chain length. The microstructure of the adsorbed layer in terms of micropolarity and aggregation numbers was probed using fluorescence spectroscopy. Changes of microstructure upon dilution (desorption) were also studied. Presence of the nonionic surfactant in the mixed aggregate led to shielding of the charge of the ionic surfactant which in-turn promoted aggregation but reduced electrostatic attraction between the charged surfactant and the mineral surface. Strong consequences of surfactant interactions in solution upon adsorption as well as correlations between monomer concentrations in mixtures and adsorption were revealed.

  4. ELSA flood stack for MIS 2-3 from dry maar lakestructure Auel (Eifel/Germany)

    Science.gov (United States)

    Brunck, Heiko; Sirocko, Frank

    2015-04-01

    Lacustrine sediments are very sensitive to natural and anthropogenically enviromental changes. Thus, lake sediments are excellent climate archives and can be used for reconstructions of past precipitation and flood events. However, until now, there is no continous flood record for the entire last 60 000 years for Central Europe. The present study reconstructs paleo floods from event layers in the sediment, of dry maar lakestructure Auel (Eifel). This silted up basin has an inflow by a local stream. Accordingly the sedimentation rate is directly linked to runoff activity. The bioturbation was low so that event layers become visible, but varves are not preserved. The maar site is near to the town of Gerolstein in the Eifel; the core AU2 was drilled in the ELSA (Eifel Laminated Sediment archive) project and is 123m long. AU2 has the highest sedimentation rate of all ELSA cores, due to abundant fluvial input. The Eifel area is well suited to approximate Central European weather, because modern water level gauge data from Eifel rivers correlate with respective data from the Rhine (Wernli and Pfahl, 2009). Due to the high inflow into the maar, Auel has the highest number of botanical macro remains of all ELSA cores. These specific conditions explain why only in AU2 all 21 Greenland interstadials can be observed in the abundance of wood remains and the organic carbon concentration. In a final stratigraphic step the time series of Corg was tuned to the Greenland ice core chronology to link the central European landscape evolution directly to the Greenland climate curve (Svensson et al., 2008). Combined sedimentological, paleobotanical and geochemical data received from AU2 builds the foundation of the 14C based chronology. The synchronisation of the record with other cores is controlled by tephra time markers and pollen. Both are used to align the main cores of the ELSA project and construct an integrated age model for the last 220 000 years [b2k] (Förster and Sirocko

  5. The Advanced Rapid Imaging and Analysis (ARIA) Project: Status of SAR products for Earthquakes, Floods, Volcanoes and Groundwater-related Subsidence

    Science.gov (United States)

    Owen, S. E.; Yun, S. H.; Hua, H.; Agram, P. S.; Liu, Z.; Sacco, G. F.; Manipon, G.; Linick, J. P.; Fielding, E. J.; Lundgren, P.; Farr, T. G.; Webb, F.; Rosen, P. A.; Simons, M.

    2017-12-01

    The Advanced Rapid Imaging and Analysis (ARIA) project for Natural Hazards is focused on rapidly generating high-level geodetic imaging products and placing them in the hands of the solid earth science and local, national, and international natural hazard communities by providing science product generation, exploration, and delivery capabilities at an operational level. Space-based geodetic measurement techniques including Interferometric Synthetic Aperture Radar (InSAR), differential Global Positioning System, and SAR-based change detection have become critical additions to our toolset for understanding and mapping the damage and deformation caused by earthquakes, volcanic eruptions, floods, landslides, and groundwater extraction. Up until recently, processing of these data sets has been handcrafted for each study or event and has not generated products rapidly and reliably enough for response to natural disasters or for timely analysis of large data sets. The ARIA project, a joint venture co-sponsored by the California Institute of Technology and by NASA through the Jet Propulsion Laboratory, has been capturing the knowledge applied to these responses and building it into an automated infrastructure to generate imaging products in near real-time that can improve situational awareness for disaster response. In addition to supporting the growing science and hazard response communities, the ARIA project has developed the capabilities to provide automated imaging and analysis capabilities necessary to keep up with the influx of raw SAR data from geodetic imaging missions such as ESA's Sentinel-1A/B, now operating with repeat intervals as short as 6 days, and the upcoming NASA NISAR mission. We will present the progress and results we have made on automating the analysis of Sentinel-1A/B SAR data for hazard monitoring and response, with emphasis on recent developments and end user engagement in flood extent mapping and deformation time series for both volcano

  6. Flood Risk Management In Europe: European flood regulation

    NARCIS (Netherlands)

    Hegger, D.L.T.; Bakker, M.H.; Green, C.; Driessen, Peter; Delvaux, B.; Rijswick, H.F.M.W. van; Suykens, C.; Beyers, J-C.; Deketelaere, K.; Doorn-Hoekveld, W. van; Dieperink, C.

    2013-01-01

    In Europe, water management is moving from flood defense to a risk management approach, which takes both the probability and the potential consequences of flooding into account. In this report, we will look at Directives and (non-)EU- initiatives in place to deal with flood risk in Europe indirectly

  7. The Total Risk Analysis of Large Dams under Flood Hazards

    Directory of Open Access Journals (Sweden)

    Yu Chen

    2018-02-01

    Full Text Available Dams and reservoirs are useful systems in water conservancy projects; however, they also pose a high-risk potential for large downstream areas. Flood, as the driving force of dam overtopping, is the main cause of dam failure. Dam floods and their risks are of interest to researchers and managers. In hydraulic engineering, there is a growing tendency to evaluate dam flood risk based on statistical and probabilistic methods that are unsuitable for the situations with rare historical data or low flood probability, so a more reasonable dam flood risk analysis method with fewer application restrictions is needed. Therefore, different from previous studies, this study develops a flood risk analysis method for large dams based on the concept of total risk factor (TRF used initially in dam seismic risk analysis. The proposed method is not affected by the adequacy of historical data or the low probability of flood and is capable of analyzing the dam structure influence, the flood vulnerability of the dam site, and downstream risk as well as estimating the TRF of each dam and assigning corresponding risk classes to each dam. Application to large dams in the Dadu River Basin, Southwestern China, demonstrates that the proposed method provides quick risk estimation and comparison, which can help local management officials perform more detailed dam safety evaluations for useful risk management information.

  8. Stage discharge curve for Guillemard Bridge streamflow sation based on rating curve method using historical flood event data

    International Nuclear Information System (INIS)

    Ros, F C; Sidek, L M; Desa, M N; Arifin, K; Tosaka, H

    2013-01-01

    The purpose of the stage-discharge curves varies from water quality study, flood modelling study, can be used to project climate change scenarios and so on. As the bed of the river often changes due to the annual monsoon seasons that sometimes cause by massive floods, the capacity of the river will changed causing shifting controlled to happen. This study proposes to use the historical flood event data from 1960 to 2009 in calculating the stage-discharge curve of Guillemard Bridge located in Sg. Kelantan. Regression analysis was done to check the quality of the data and examine the correlation between the two variables, Q and H. The mean values of the two variables then were adopted to find the value of difference between zero gauge height and the level of zero flow, 'a', K and 'n' to fit into rating curve equation and finally plotting the stage-discharge rating curve. Regression analysis of the historical flood data indicate that 91 percent of the original uncertainty has been explained by the analysis with the standard error of 0.085.

  9. Shippingport Station Decommissioning Project (SSDP): configuration control system and project activity controls

    International Nuclear Information System (INIS)

    Mullee, G.R.

    1986-01-01

    The SSDP has been using a Configuration Control system as a significant element in the management plan for the safe and effective performance of the project. The objective of the Configuration Control system is to control the physical plant configuration, system status, work schedules, status tracking, and day-to-day problem resolution. Prior to the Decommissioning Operations Contractor (DOC) assuming operational responsibility for the Shippingport Plant, an assessment was made of the status of the configuration of the systems and related documentation. Action was taken as required to match the operating procedures and system documentation with the actual physical condition of the plant. During the first stage of the project, planning was put in place for subsequent decommissioning activities. This planning included defining organizational responsibilities, completing the necessary project instructions and procedures, and doing the planning and scheduling for the subsequent decommissioning phase activities. Detailed instructions for the performance of the various decommissioning tasks were prepared. Prior to the start of any work on a given Activity Package, a Work Authorization is required. The Work Authorization form provides a complete checklist to ensure that all necessary prerequisites are completed. A computerized Communications Configuration Control Information system monitors status including information on system status, tag-outs, radiological work permits, etc. An ongoing effort is being directed toward maintaining operating instructions and system schematics, etc. current as the Plant configuration changes. The experience with the Configuration Control System to date has been favorable

  10. Belford proactive flood solutions: scientific evidence to influence local and national policy by multi-purpose runoff management

    Science.gov (United States)

    Wilkinson, M.; Quinn, P. F.; Jonczyk, J.

    2010-12-01

    The increased risk from flooding continues to be of concern to governments all around the world and flood protection is becoming more of a challenge. In the UK, climate change projections indicate more extremes within the weather systems. In addition, there is an increased demand for using land in urban areas beside channels. These developments both put pressure on our flood defences and there is a need for new solutions to managing flood risk. There is currently support within the England and Wales Environment Agency for sustainable flood management solutions such as storage ponds, wetlands, beaver dams and willow riparian features (referred to here as Runoff Attenuation Features, or RAFs). However the effectiveness of RAFs are not known at the catchment scale since they have only really been trailed at the plot scale. These types of mitigation measure can offer benefits to water quality and create ecological habitats. The village of Belford, situated in the Belford Burn catchment (6km2), northern England, has suffered from numerous flood events. In addition, the catchment suffers from water quality issues within the channel and high sediment loads are having an impact on the ecology of the nearby estuary. There was a desire by the Local Environment Agency Flood Levy team to deliver an alternative catchment-based solution to the problem. With funding from the Northumbria Regional Flood Defence Committee, the Environment Agency North East Local Levy team and Newcastle University have created a partnership to address the flood problem trailing soft engineered RAF’s at the catchment scale. The partnership project, “Belford proactive flood solutions” is testing novel techniques in reducing flood risk in small sub-catchments for the Environment Agency. The project provides the information needed to understand whether the multi-functional mitigation measures are working at the sub-catchment scale. Data suggest that the mitigation measures present have delayed the

  11. Project Management Effectiveness: the choice - formal or informal controls

    Directory of Open Access Journals (Sweden)

    Jon Heales

    2007-12-01

    Full Text Available Development failures and runaway projects in the information systems (IS area can result in substantial losses to organizations, either financially or to a company’s reputation. One important strategy in mitigating risk is the use of effective controls over IS projects. This research investigates the effectiveness of control mechanisms in IS projects, i.e., how they have been established, applied, and how they have evolved throughout the project. We conducted an in-depth study of six information systems projects with six different project managers. We found that formal controls were adopted on project elements with clearly defined project outcomes and informal controls were adopted mainly on project elements that were unclear and often related to people. Furthermore, formal controls were dominant at project initiation and in most cases these controls became less dominant over the project duration. These formal controls were more rigorously applied in external IS projects while informal controls increased in importance throughout the project duration in internally developed projects. We found the existence of informal controls to be very important in helping ensure successful project outcomes.

  12. Estimation of phosphorus flux in rivers during flooding.

    Science.gov (United States)

    Chen, Yen-Chang; Liu, Jih-Hung; Kuo, Jan-Tai; Lin, Cheng-Fang

    2013-07-01

    Reservoirs in Taiwan are inundated with nutrients that result in algal growth, and thus also reservoir eutrophication. Controlling the phosphorus load has always been the most crucial issue for maintaining reservoir water quality. Numerous agricultural activities, especially the production of tea in riparian areas, are conducted in watersheds in Taiwan. Nutrients from such activities, including phosphorus, are typically flushed into rivers during flooding, when over 90% of the yearly total amount of phosphorous enters reservoirs. Excessive or enhanced soil erosion from rainstorms can dramatically increase the river sediment load and the amount of particulate phosphorus flushed into rivers. When flow rates are high, particulate phosphorus is the dominant form of phosphorus, but sediment and discharge measurements are difficult during flooding, which makes estimating phosphorus flux in rivers difficult. This study determines total amounts of phosphorus transport by measuring flood discharge and phosphorous levels during flooding. Changes in particulate phosphorus, dissolved phosphorus, and their adsorption behavior during a 24-h period are analyzed owing to the fact that the time for particulate phosphorus adsorption and desorption approaching equilibrium is about 16 h. Erosion of the reservoir watershed was caused by adsorption and desorption of suspended solids in the river, a process which can be summarily described using the Lagmuir isotherm. A method for estimating the phosphorus flux in the Daiyujay Creek during Typhoon Bilis in 2006 is presented in this study. Both sediment and phosphorus are affected by the drastic discharge during flooding. Water quality data were collected during two flood events, flood in June 9, 2006 and Typhoon Bilis, to show the concentrations of suspended solids and total phosphorus during floods are much higher than normal stages. Therefore, the drastic changes of total phosphorus, particulate phosphorus, and dissolved phosphorus in

  13. Guiding rational reservoir flood operation using penalty-type genetic algorithm

    Science.gov (United States)

    Chang, Li-Chiu

    2008-06-01

    SummaryReal-time flood control of a multi-purpose reservoir should consider decreasing the flood peak stage downstream and storing floodwaters for future usage during typhoon seasons. This study proposes a reservoir flood control optimization model with linguistic description of requirements and existing regulations for rational operating decisions. The approach involves formulating reservoir flood operation as an optimization problem and using the genetic algorithm (GA) as a search engine. The optimizing formulation is expressed not only by mathematical forms of objective function and constraints, but also by no analytic expression in terms of parameters. GA is used to search a global optimum of a mixture of mathematical and nonmathematical formulations. Due to the great number of constraints and flood control requirements, it is difficult to reach a solution without violating constraints. To tackle this bottleneck, the proper penalty strategy for each parameter is proposed to guide the GA searching process. The proposed approach is applied to the Shihmen reservoir in North Taiwan for finding the rational release and desired storage as a case study. The hourly historical data sets of 29 typhoon events that have hit the area in last thirty years are investigated bye the proposed method. To demonstrate the effectiveness of the proposed approach, the simplex method was performed. The results demonstrated that a penalty-type genetic algorithm could effectively provide rational hydrographs to reduce flood damage during the flood operation and to increase final storage for future usages.

  14. A Probabilistic Analysis of Surface Water Flood Risk in London.

    Science.gov (United States)

    Jenkins, Katie; Hall, Jim; Glenis, Vassilis; Kilsby, Chris

    2017-10-30

    Flooding in urban areas during heavy rainfall, often characterized by short duration and high-intensity events, is known as "surface water flooding." Analyzing surface water flood risk is complex as it requires understanding of biophysical and human factors, such as the localized scale and nature of heavy precipitation events, characteristics of the urban area affected (including detailed topography and drainage networks), and the spatial distribution of economic and social vulnerability. Climate change is recognized as having the potential to enhance the intensity and frequency of heavy rainfall events. This study develops a methodology to link high spatial resolution probabilistic projections of hourly precipitation with detailed surface water flood depth maps and characterization of urban vulnerability to estimate surface water flood risk. It incorporates probabilistic information on the range of uncertainties in future precipitation in a changing climate. The method is applied to a case study of Greater London and highlights that both the frequency and spatial extent of surface water flood events are set to increase under future climate change. The expected annual damage from surface water flooding is estimated to be to be £171 million, £343 million, and £390 million/year under the baseline, 2030 high, and 2050 high climate change scenarios, respectively. © 2017 Society for Risk Analysis.

  15. Flooding and subsidence in the Thames Gateway: impact on insurance loss potential

    Science.gov (United States)

    Royse, Katherine; Horn, Diane; Eldridge, Jillian; Barker, Karen

    2010-05-01

    and sediment, or rehydration of sediment under flood water. The latter mechanism may be particularly critical on sites where Holocene sediments are currently protected from flooding and are no longer subsiding. Holocene deposits tend to compress, either under their own weight or under a superimposed load such as made ground, built structures or flood water. If protected dry sediments become flooded in the future, subsidence would be expected to resume. This research project aims to investigate the correlation between flood hazards and subsidence hazards and the effect that these two sources of risk will have on insurance losses in the Thames Gateway. In particular, the research will explore the potential hydrological and geophysical drivers and links between flood and subsidence events within the Thames Gateway, assessing the potential for significant event occurrence within the timescales relevant to insurers. In the first part of the project we have identified flood risk areas within the Thames Gateway development zone which have a high risk of flooding and may be affected by renewed or increased subsidence. This has been achieved through the use of national and local-scale 2D and 3D geo-environmental information such as the Geosure dataset (e.g. swell-shrink, collapsible and compressible deposits data layers), PSI data, thickness of superficial and artificial land deposits, and flood potential data etc. In the second stage of the project we will investigate the hydrological and geophysical links between flooding and subsidence events on developed sites; quantify the insurance loss potential in the Thames Gateway from correlated flooding and subsidence events; consider how climate change will affect risk to developments in the Thames Gateway in the context of subsidence and flooding; and develop new ways of communicating and visualise correlated flood and subsidence risk to a range of stakeholders, including the insurance industry, planners, policy makers and the

  16. Challenges of torrential flood risk management in Serbia

    Directory of Open Access Journals (Sweden)

    Petrović Ana M.

    2015-01-01

    Full Text Available Torrential floods are the natural hydrological hazards manifesting as a consequence of extreme rainfall episodes which have a quick response from the watersheds of small areas, steep slopes and intensive soil erosion. Taking in consideration the nature of torrential flood (sudden and destructive occurrence and the fact they are the most frequent natural hazards in Serbia, torrential flood risk management is a real challenge. Instead of partial solutions for flood protection, integrated torrential flood risk management is more meaningful and effective. The key steps should be an improvement of the legal framework on national level and an expansion of technical and biological torrent control works in river basins. Consequences for society can be significantly reduced if there is an efficient forecast and timely warning, rescue and evacuation and if affected population is educated about flood risks and measures which can be undertaken in case of emergency situation. In this paper, all aspects of torrential flood risk management are analyzed. [Projekat Ministarstva nauke Republike Srbije, br. 47007 III

  17. Numerical modelling of the impact of flood wave cyclicality on the stability of levees

    Directory of Open Access Journals (Sweden)

    Franczyk Anna

    2016-01-01

    Full Text Available Sensitivity analysis applied to the flooding process is discussed in the paper. The analysis was done as part of the ISMOP project devoted to elaborating and designing a complex system for embankment monitoring and threat forecasting. The analysis was performed using selected geotechnical parameters that describe embankment state. It was shown that the sensitivity analysis method is very practical for detecting places where the largest vertical displacement and pore pressure distribution are observed. The sensitivity analysis was carried out for a single flood wave numerical experiment as well as for a double successive flood wave experiment. Comparison of the results allowed us to detect the places where the biggest differences in total relative sensitivity values are observed. Plots of these differences can help to indicate the particular places within the embankment that are the most influenced by successive flood waves and should be especially examined during field experiments as part of the ISMOP project.

  18. Development of a flood early warning system and communication with end-users: the Vipava/Vipacco case study in the KULTURisk FP7 project

    Science.gov (United States)

    Grossi, Giovanna; Caronna, Paolo; Ranzi, Roberto

    2014-05-01

    Within the framework of risk communication, the goal of an early warning system is to support the interaction between technicians and authorities (and subsequently population) as a prevention measure. The methodology proposed in the KULTURisk FP7 project aimed to build a closer collaboration between these actors, in the perspective of promoting pro-active actions to mitigate the effects of flood hazards. The transnational (Slovenia/ Italy) Soča/Isonzo case study focused on this concept of cooperation between stakeholders and hydrological forecasters. The DIMOSHONG_VIP hydrological model was calibrated for the Vipava/Vipacco River (650 km2), a tributary of the Soča/Isonzo River, on the basis of flood events occurred between 1998 and 2012. The European Centre for Medium-Range Weather Forecasts (ECMWF) provided the past meteorological forecasts, both deterministic (1 forecast) and probabilistic (51 ensemble members). The resolution of the ECMWF grid is currently about 15 km (Deterministic-DET) and 30 km (Ensemble Prediction System-EPS). A verification was conducted to validate the flood-forecast outputs of the DIMOSHONG_VIP+ECMWF early warning system. Basic descriptive statistics, like event probability, probability of a forecast occurrence and frequency bias were determined. Some performance measures were calculated, such as hit rate (probability of detection) and false alarm rate (probability of false detection). Relative Opening Characteristic (ROC) curves were generated both for deterministic and probabilistic forecasts. These analysis showed a good performance of the early warning system, in respect of the small size of the sample. A particular attention was spent to the design of flood-forecasting output charts, involving and inquiring stakeholders (Alto Adriatico River Basin Authority), hydrology specialists in the field, and common people. Graph types for both forecasted precipitation and discharge were set. Three different risk thresholds were identified

  19. Economic Shocks and Civil Conflict: The Case of Large Floods

    OpenAIRE

    Ghimire, Ramesh; Ferreira, Susana

    2013-01-01

    We investigate the impact of large floods on the risk of civil conflict in a sample of 125 countries between 1985 and 2009. We control for endogeneity of floods and the potential spatial and temporal dependency of civil conflict. We find that floods increase the probability of conflict incidence through a negative impact on short-run GDP growth.

  20. Historical flood data series of Eastern Spanish Coast (14th-20th centuries). Improving identification of climatic patterns and human factors of flood events from primary documentary sources

    Science.gov (United States)

    Alberola, Armando; Barriendos, Mariano; Gil-Guirado, Salvador; Pérez-Morales, Alfredo; Balasch, Carles; Castelltort, Xavier; Mazón, Jordi; Pino, David; Lluís Ruiz-Bellet, Josep; Tuset, Jordi

    2016-04-01

    Historical flood data series of Eastern Spanish Coast (14th-20th centuries). Improving identification of climatic patterns and human factors of flood events from primary documentary sources Armando Alberola, Barriendos, M., Gil-Guirado, S., Pérez Morales, A., Balasch, C., Castelltort, X., Mazón, J., Pino, D., Ruiz-Bellet, J.L., Tuset, J. Historical flood events in eastern spanish coast have been studied by different research groups and projects. Complexity of flood processes, involving atmospheric, surface and human factors, is not easily understandable when long time series are required. Present analysis from PREDIFLOOD Project Consortium defines a new step of flood event databases: Improved access to primary (documentary) and secondary (bibliographical) sources, data collection for all possible locations where floods are detected, and improved system of classification (Barriendos et al., 2014). A first analysis is applied to 8 selected flood series. Long chronologies from PREDIFLOOD Project for Catalonia region (Girona, Barcelona, Tarragona, Lleida, Tortosa). In addition, to cover all sector of spanish mediterranean coast, we introduce Valencia city in Turia River basin. South Eastern sector is cover with Murcia and Caravaca cities, Segura River basin. Extension of area under study required contributions of research teams experienced in work of documentary primary sources (Alberola, 2006; Gil-Guirado, 2013). Flood frequency analysis for long scale periods show natural climatic oscillations into so-called Little Ice Age. There are general patterns, affecting most of basins, but also some local anomalies or singularities. To explain these differences and analogies it is not enough to use purely climatic factors. In this way, we analyze human factors that have been able to influence the variability of floods along last 6 centuries (demography, hydraulic infrastructures, urban development...). This approach improves strongly understanding of mechanisms producing

  1. Flood-rich and flood-poor periods in Spain in 1942-2009

    Science.gov (United States)

    Mediero, Luis; Santillán, David; Garrote, Luis

    2016-04-01

    Several studies to detect trends in flood series at either national or trans-national scales have been conducted. Mediero et al. (2015) studied flood trends by using the longest streamflow records available in Europe. They found a decreasing trend in the Atlantic, Continental and Scandinavian regions. More specifically, Mediero et al. (2014) found a general decreasing trend in flood series in Spain in the period 1959-2009. Trends in flood series are usually detected by the Mann-Kendall test applied to a given period. However, the result of the Mann-Kendall test can change in terms of the starting and ending year of the series. Flood oscillations can occur and flood-rich and flood-poor periods could condition the results, especially when they are located at the beginning or end of the series. A methodology to identify statistically significant flood-rich and flood-poor periods is developed, based on the comparison between the expected sampling variability of floods when stationarity is assumed and the observed variability of floods in a given series. The methodology is applied to the longest series of annual maximum floods, peaks over threshold and counts of annual occurrences in peaks over threshold series observed in Spain in the period 1942-2009. A flood-rich period in 1950-1970 and a flood-poor period in 1970-1990 are identified in most of the selected sites. The generalised decreasing trend in flood series found by Mediero et al. (2014) could be explained by a flood-rich period placed at the beginning of the series and a flood-poor period located at the end of the series. References: Mediero, L., Kjeldsen, T.R., Macdonald, N., Kohnova, S., Merz, B., Vorogushyn, S., Wilson, D., Alburquerque, T., Blöschl, G., Bogdanowicz, E., Castellarin, A., Hall, J., Kobold, M., Kriauciuniene, J., Lang, M., Madsen, H., Onuşluel Gül, G., Perdigão, R.A.P., Roald, L.A., Salinas, J.L., Toumazis, A.D., Veijalainen, N., Óðinn Þórarinsson. Identification of coherent flood

  2. Sequential planning of flood protection infrastructure under limited historic flood record and climate change uncertainty

    Science.gov (United States)

    Dittes, Beatrice; Špačková, Olga; Straub, Daniel

    2017-04-01

    Flood protection is often designed to safeguard people and property following regulations and standards, which specify a target design flood protection level, such as the 100-year flood level prescribed in Germany (DWA, 2011). In practice, the magnitude of such an event is only known within a range of uncertainty, which is caused by limited historic records and uncertain climate change impacts, among other factors (Hall & Solomatine, 2008). As more observations and improved climate projections become available in the future, the design flood estimate changes and the capacity of the flood protection may be deemed insufficient at a future point in time. This problem can be mitigated by the implementation of flexible flood protection systems (that can easily be adjusted in the future) and/or by adding an additional reserve to the flood protection, i.e. by applying a safety factor to the design. But how high should such a safety factor be? And how much should the decision maker be willing to pay to make the system flexible, i.e. what is the Value of Flexibility (Špačková & Straub, 2017)? We propose a decision model that identifies cost-optimal decisions on flood protection capacity in the face of uncertainty (Dittes et al. 2017). It considers sequential adjustments of the protection system during its lifetime, taking into account its flexibility. The proposed framework is based on pre-posterior Bayesian decision analysis, using Decision Trees and Markov Decision Processes, and is fully quantitative. It can include a wide range of uncertainty components such as uncertainty associated with limited historic record or uncertain climate or socio-economic change. It is shown that since flexible systems are less costly to adjust when flood estimates are changing, they justify initially lower safety factors. Investigation on the Value of Flexibility (VoF) demonstrates that VoF depends on the type and degree of uncertainty, on the learning effect (i.e. kind and quality of

  3. Rethinking the relationship between flood risk perception and flood management.

    Science.gov (United States)

    Birkholz, S; Muro, M; Jeffrey, P; Smith, H M

    2014-04-15

    Although flood risk perceptions and their concomitant motivations for behaviour have long been recognised as significant features of community resilience in the face of flooding events, there has, for some time now, been a poorly appreciated fissure in the accompanying literature. Specifically, rationalist and constructivist paradigms in the broader domain of risk perception provide different (though not always conflicting) contexts for interpreting evidence and developing theory. This contribution reviews the major constructs that have been applied to understanding flood risk perceptions and contextualises these within broader conceptual developments around risk perception theory and contemporary thinking around flood risk management. We argue that there is a need to re-examine and re-invigorate flood risk perception research, in a manner that is comprehensively underpinned by more constructivist thinking around flood risk management as well as by developments in broader risk perception research. We draw attention to an historical over-emphasis on the cognitive perceptions of those at risk to the detriment of a richer understanding of a wider range of flood risk perceptions such as those of policy-makers or of tax-payers who live outside flood affected areas as well as the linkages between these perspectives and protective measures such as state-supported flood insurance schemes. Conclusions challenge existing understandings of the relationship between risk perception and flood management, particularly where the latter relates to communication strategies and the extent to which those at risk from flooding feel responsible for taking protective actions. Copyright © 2014 Elsevier B.V. All rights reserved.

  4. Feedbacks among Floods, Pioneer Woody Vegetation, and Channel Change in Sand-Bed Rivers: Insights from Field Studies of Controlled Flood Releases and Models

    Science.gov (United States)

    Wilcox, A. C.; Shafroth, P. B.; Lightbody, A.; Stella, J. C.; Bywater-Reyes, S.; Kiu, L.; Skorko, K.

    2012-04-01

    To investigate feedbacks between flow, geomorphic processes, and pioneer riparian vegetation in sand-bed rivers, we are combining field, hydraulic modeling, and laboratory simulations. Field studies have examined the response of woody riparian seedlings and channel morphology to prescribed dam-released floods that have been designed in part to maintain a native riparian woodland system on the Bill Williams River, Arizona, USA. Through monitoring of floods over a 7-year period, we have observed temporal and spatial variations in channel response. Floods have produced geomorphic and vegetation responses that varied with distance downstream of a dam, with scour and associated seedling mortality closer to the dam and aggradation and burial-induced mortality in a downstream reach with greater sediment supply. We also have observed that as vegetation grows beyond the seedling stage, its stabilizing effect on bars and its drag effect on flow progressively increases, such that floods of similar sizes but at different times may produce markedly different downstream responses as a function of vegetation characteristics. We also observed greater mortality among nonnative Tamarix spp. (tamarisk) seedlings than among native Salix gooddingii (Goodding's willow) seedlings, likely as a result of the greater first-year growth of willow relative to tamarisk. Combining field observations with modeling predictions of local hydraulics for the flood events we have studied is being used to draw linkages between hydraulics, channel change, and plant response at the patch and bar scale. In addition, mechanistic linkages are being examined using a field-scale laboratory stream channel, where seedlings of Tamarix spp. (tamarisk) and Populus fremontii (cottonwood) were planted and subjected to floods with varying sediment feed rate and plant configurations. The floods conveyed by our model channel were generally insufficient to scour the woody seedlings we planted, but changes in bar size and

  5. 78 FR 77397 - Flood Control Regulations, Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas

    Science.gov (United States)

    2013-12-23

    ... Regulations, Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas AGENCY: U.S. Army Corps... Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas. In 1997, the Lower Colorado River... regulations to reflect changes in ownership and responsibilities of flood control management of Marshall Ford...

  6. Beaver dams, hydrological thresholds, and controlled floods as a management tool in a desert riverine ecosystem, Bill Williams River, Arizona

    Science.gov (United States)

    Andersen, D.C.; Shafroth, P.B.

    2010-01-01

    Beaver convert lotic stream habitat to lentic through dam construction, and the process is reversed when a flood or other event causes dam failure. We investigated both processes on a regulated Sonoran Desert stream, using the criterion that average current velocity is beaver pond length (determined by the upstream lentic-lotic boundary position) to dam size, and coupling that to the dam-size frequency distribution and repeated censuses of dams along the 58-km river. The ratio fell from 19:1 when no beaver dams were present to beaver. We investigated the dam failure-flood intensity relationship in three independent trials (experimental floods) featuring peak discharge ranging from 37 to 65 m3 s-1. Major damage (breach ??? 3-m wide) occurred at ??? 20% of monitored dams (n = 7-86) and a similar or higher proportion was moderately damaged. We detected neither a relationship between dam size and damage level nor a flood discharge threshold for initiating major damage. Dam constituent materials appeared to control the probability of major damage at low (attenuated) flood magnitude. We conclude that environmental flows prescribed to sustain desert riparian forest will also reduce beaver-created lentic habitat in a non-linear manner determined by both beaver dam and flood attributes. Consideration of both desirable and undesirable consequences of ecological engineering by beaver is important when optimizing environmental flows to meet ecological and socioeconomic goals. ?? 2010 John Wiley & Sons, Ltd.

  7. May flood-poor periods be more dangerous than flood-rich periods?

    Science.gov (United States)

    Salinas, Jose Luis; Di Baldassarre, Giuliano; Viglione, Alberto; Kuil, Linda; Bloeschl, Guenter

    2014-05-01

    River floods are among the most devastating natural hazards experienced by populations that, since the earliest recorded civilisations, have settled in floodplains because they offer favourable conditions for trade, agriculture, and economic development. The occurrence of a flood may cause loss of lives and tremendous economic damages and, therefore, is rightly seen as a very negative event by the communities involved. Occurrence of many floods in a row is, of course, even more frustrating and is rightly considered a unbearable calamity. Unfortunately, the occurrence of many floods in a limited number of consecutive years is not unusual. In many places in the world, it has been observed that extreme floods do not arrive randomly but cluster in time into flood-poor and flood-rich periods consistent with the Hurst effect. If this is the case, when are the people more in danger? When should people be more scared? In flood-poor or flood-rich periods? In this work, a Socio-Hydrology model (Di Baldassarre et al., 2013; Viglione et al., 2014) is used to show that, maybe counter-intuitively, flood-poor periods may be more dangerous than flood-rich periods. The model is a conceptualisation of a hypothetical setting of a city at a river where a community evolves, making choices between flood management options on the floodplain. The most important feedbacks between the economic, political, technological and hydrological processes of the evolution of that community are represented in the model. In particular, the model also accounts in a dynamic way for the evolution of the the community awareness to flood risk. Occurrence of floods tends to increase peoples' recognition that their property is in an area that is potentially at risk of flooding, both at the scales of individuals and communities, which is one of the main reasons why flood coping actions are taken. It is shown through examples that frequent flood events may result in moderate damages because they ensure that the

  8. Swiss Re Global Flood Hazard Zones: Know your flood risk

    Science.gov (United States)

    Vinukollu, R. K.; Castaldi, A.; Mehlhorn, J.

    2012-12-01

    Floods, among all natural disasters, have a great damage potential. On a global basis, there is strong evidence of increase in the number of people affected and economic losses due to floods. For example, global insured flood losses have increased by 12% every year since 1970 and this is expected to further increase with growing exposure in the high risk areas close to rivers and coastlines. Recently, the insurance industry has been surprised by the large extent of losses, because most countries lack reliable hazard information. One example has been the 2011 Thailand floods where millions of people were affected and the total economic losses were 30 billion USD. In order to assess the flood risk across different regions and countries, the flood team at Swiss Re based on a Geomorphologic Regression approach, developed in house and patented, produced global maps of flood zones. Input data for the study was obtained from NASA's Shuttle Radar Topographic Mission (SRTM) elevation data, Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER) Global Digital Elevation Model (GDEM) and HydroSHEDS. The underlying assumptions of the approach are that naturally flowing rivers shape their channel and flood plain according to basin inherent forces and characteristics and that the flood water extent strongly depends on the shape of the flood plain. On the basis of the catchment characteristics, the model finally calculates the probability of a location to be flooded or not for a defined return period, which in the current study was set to 100 years. The data is produced at a 90-m resolution for latitudes 60S to 60N. This global product is now used in the insurance industry to inspect, inform and/or insure the flood risk across the world.

  9. Knowledge Discovery, Integration and Communication for Extreme Weather and Flood Resilience Using Artificial Intelligence: Flood AI Alpha

    Science.gov (United States)

    Demir, I.; Sermet, M. Y.

    2016-12-01

    Nobody is immune from extreme events or natural hazards that can lead to large-scale consequences for the nation and public. One of the solutions to reduce the impacts of extreme events is to invest in improving resilience with the ability to better prepare, plan, recover, and adapt to disasters. The National Research Council (NRC) report discusses the topic of how to increase resilience to extreme events through a vision of resilient nation in the year 2030. The report highlights the importance of data, information, gaps and knowledge challenges that needs to be addressed, and suggests every individual to access the risk and vulnerability information to make their communities more resilient. This abstracts presents our project on developing a resilience framework for flooding to improve societal preparedness with objectives; (a) develop a generalized ontology for extreme events with primary focus on flooding; (b) develop a knowledge engine with voice recognition, artificial intelligence, natural language processing, and inference engine. The knowledge engine will utilize the flood ontology and concepts to connect user input to relevant knowledge discovery outputs on flooding; (c) develop a data acquisition and processing framework from existing environmental observations, forecast models, and social networks. The system will utilize the framework, capabilities and user base of the Iowa Flood Information System (IFIS) to populate and test the system; (d) develop a communication framework to support user interaction and delivery of information to users. The interaction and delivery channels will include voice and text input via web-based system (e.g. IFIS), agent-based bots (e.g. Microsoft Skype, Facebook Messenger), smartphone and augmented reality applications (e.g. smart assistant), and automated web workflows (e.g. IFTTT, CloudWork) to open the knowledge discovery for flooding to thousands of community extensible web workflows.

  10. Projected 21st century coastal flooding in the Southern California Bight. Part 1: Development of the third generation CoSMoS model

    Science.gov (United States)

    O'Neill, Andrea; Erikson, Li; Barnard, Patrick; Limber, Patrick; Vitousek, Sean; Warrick, Jonathan; Foxgrover, Amy C.; Lovering, Jessica

    2018-01-01

    Due to the effects of climate change over the course of the next century, the combination of rising sea levels, severe storms, and coastal change will threaten the sustainability of coastal communities, development, and ecosystems as we know them today. To clearly identify coastal vulnerabilities and develop appropriate adaptation strategies due to projected increased levels of coastal flooding and erosion, coastal managers need local-scale hazards projections using the best available climate and coastal science. In collaboration with leading scientists world-wide, the USGS designed the Coastal Storm Modeling System (CoSMoS) to assess the coastal impacts of climate change for the California coast, including the combination of sea-level rise, storms, and coastal change. In this project, we directly address the needs of coastal resource managers in Southern California by integrating a vast range of global climate change projections in a thorough and comprehensive numerical modeling framework. In Part 1 of a two-part submission on CoSMoS, methods and the latest improvements are discussed, and an example of hazard projections is presented.

  11. Planning of technical flood retention measures in large river basins under consideration of imprecise probabilities of multivariate hydrological loads

    Directory of Open Access Journals (Sweden)

    D. Nijssen

    2009-08-01

    Full Text Available As a result of the severe floods in Europe at the turn of the millennium, the ongoing shift from safety oriented flood control towards flood risk management was accelerated. With regard to technical flood control measures it became evident that the effectiveness of flood control measures depends on many different factors, which cannot be considered with single events used as design floods for planning. The multivariate characteristics of the hydrological loads have to be considered to evaluate complex flood control measures. The effectiveness of spatially distributed flood control systems differs for varying flood events. Event-based characteristics such as the spatial distribution of precipitation, the shape and volume of the resulting flood waves or the interactions of flood waves with the technical elements, e.g. reservoirs and flood polders, result in varying efficiency of these systems. Considering these aspects a flood control system should be evaluated with a broad range of hydrological loads to get a realistic assessment of its performance under different conditions. The consideration of this variety in flood control planning design was one particular aim of this study. Hydrological loads were described by multiple criteria. A statistical characterization of these criteria is difficult, since the data base is often not sufficient to analyze the variety of possible events. Hydrological simulations were used to solve this problem. Here a deterministic-stochastic flood generator was developed and applied to produce a large quantity of flood events which can be used as scenarios of possible hydrological loads. However, these simulations imply many uncertainties. The results will be biased by the basic assumptions of the modeling tools. In flood control planning probabilities are applied to characterize uncertainties. The probabilities of the simulated flood scenarios differ from probabilities which would be derived from long time series

  12. Floods

    Science.gov (United States)

    Floods are common in the United States. Weather such as heavy rain, thunderstorms, hurricanes, or tsunamis can ... is breached, or when a dam breaks. Flash floods, which can develop quickly, often have a dangerous ...

  13. On the importance of analyzing flood defense failures

    Directory of Open Access Journals (Sweden)

    Özer Işıl Ece

    2016-01-01

    Full Text Available Flood defense failures are rare events but when they do occur lead to significant amounts of damage. The defenses are usually designed for rather low-frequency hydraulic loading and as such typically at least high enough to prevent overflow. When they fail, flood defenses like levees built with modern design codes usually either fail due to wave overtopping or geotechnical failure mechanisms such as instability or internal erosion. Subsequently geotechnical failures could trigger an overflow leading for the breach to grow in size Not only the conditions relevant for these failure mechanisms are highly uncertain, also the model uncertainty in geomechanical, internal erosion models, or breach models are high compared to other structural models. Hence, there is a need for better validation and calibration of models or, in other words, better insight in model uncertainty. As scale effects typically play an important role and full-scale testing is challenging and costly, historic flood defense failures can be used to provide insights into the real failure processes and conditions. The recently initiated SAFElevee project at Delft University of Technology aims to exploit this source of information by performing back analysis of levee failures at different level of detail. Besides detailed process based analyses, the project aims to investigate spatial and temporal patterns in deformation as a function of the hydrodynamic loading using satellite radar interferometry (i.e. PS-InSAR in order to examine its relation with levee failure mechanisms. The project aims to combine probabilistic approaches with the mechanics of the various relevant failure mechanisms to reduce model uncertainty and propose improvements to assessment and design models. This paper describes the approach of the study to levee breach analysis and the use of satellites for breach initiation analysis, both adopted within the SAFElevee project.

  14. Development of Probabilistic Flood Inundation Mapping For Flooding Induced by Dam Failure

    Science.gov (United States)

    Tsai, C.; Yeh, J. J. J.

    2017-12-01

    A primary function of flood inundation mapping is to forecast flood hazards and assess potential losses. However, uncertainties limit the reliability of inundation hazard assessments. Major sources of uncertainty should be taken into consideration by an optimal flood management strategy. This study focuses on the 20km reach downstream of the Shihmen Reservoir in Taiwan. A dam failure induced flood herein provides the upstream boundary conditions of flood routing. The two major sources of uncertainty that are considered in the hydraulic model and the flood inundation mapping herein are uncertainties in the dam break model and uncertainty of the roughness coefficient. The perturbance moment method is applied to a dam break model and the hydro system model to develop probabilistic flood inundation mapping. Various numbers of uncertain variables can be considered in these models and the variability of outputs can be quantified. The probabilistic flood inundation mapping for dam break induced floods can be developed with consideration of the variability of output using a commonly used HEC-RAS model. Different probabilistic flood inundation mappings are discussed and compared. Probabilistic flood inundation mappings are hoped to provide new physical insights in support of the evaluation of concerning reservoir flooded areas.

  15. Dam Construction in Lancang-Mekong River Basin Could Mitigate Future Flood Risk From Warming-Induced Intensified Rainfall: Dam Mitigate Flood Risk in Mekong

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Wei [Changjiang Institute of Survey, Planning, Design and Research, Wuhan China; Ministry of Education Key Laboratory for Earth System Modeling, Department of Earth System Science, Tsinghua University, Beijing China; Lu, Hui [Ministry of Education Key Laboratory for Earth System Modeling, Department of Earth System Science, Tsinghua University, Beijing China; Joint Center for Global Change Studies, Beijing China; Ruby Leung, L. [Pacific Northwest National Laboratory, Richland WA USA; Li, Hong-Yi [Department of Land Resources and Environmental Sciences and Institute on Ecosystems, Montana State University, Bozeman MT USA; Zhao, Jianshi [State Key Laboratory of Hydro-science and Engineering, Department of Hydraulic Engineering, Tsinghua University, Beijing China; Tian, Fuqiang [State Key Laboratory of Hydro-science and Engineering, Department of Hydraulic Engineering, Tsinghua University, Beijing China; Yang, Kun [Ministry of Education Key Laboratory for Earth System Modeling, Department of Earth System Science, Tsinghua University, Beijing China; Joint Center for Global Change Studies, Beijing China; Sothea, Khem [Mekong Institute of Cambodia, Phnom Penh Cambodia

    2017-10-25

    Water resources management, in particular flood control, in the Mekong River Basin (MRB) faces two key challenges in the 21st century: climate change and dam construction. A large scale distributed Geomorphology-Based Hydrological Model coupled with a simple reservoir regulation model (GBHM-MK-SOP) is used to investigate the relative effects of climate change and dam construction on the flood characteristics in the MRB. Results suggest an increase in both flood magnitude and frequency under climate change, which is more severe in the upstream basin and increases over time. However, dam construction and stream regulation reduce flood risk consistently throughout this century, with more obvious effects in the upstream basin where larger reservoirs will be located. The flood mitigation effect of dam regulation dominates over the flood intensification effect of climate change before 2060, but the latter emerges more prominently after 2060 and dominates the flood risk especially in the lower basin.

  16. Evaluating resilience of DNP3-controlled SCADA systems against event buffer flooding

    Energy Technology Data Exchange (ETDEWEB)

    Yan, Guanhua [Los Alamos National Laboratory; Nicol, David M [UNIV OF IL; Jin, Dong [UNIV OF IL

    2010-12-16

    The DNP3 protocol is widely used in SCADA systems (particularly electrical power) as a means of communicating observed sensor state information back to a control center. Typical architectures using DNP3 have a two level hierarchy, where a specialized data aggregator device receives observed state from devices within a local region, and the control center collects the aggregated state from the data aggregator. The DNP3 communication between control center and data aggregator is asynchronous with the DNP3 communication between data aggregator and relays; this leads to the possibility of completely filling a data aggregator's buffer of pending events, when a relay is compromised or spoofed and sends overly many (false) events to the data aggregator. This paper investigates how a real-world SCADA device responds to event buffer flooding. A Discrete-Time Markov Chain (DTMC) model is developed for understanding this. The DTMC model is validated by a Moebius simulation model and data collected on real SCADA testbed.

  17. Probabilistic flood extent estimates from social media flood observations

    NARCIS (Netherlands)

    Brouwer, Tom; Eilander, Dirk; Van Loenen, Arnejan; Booij, Martijn J.; Wijnberg, Kathelijne M.; Verkade, Jan S.; Wagemaker, Jurjen

    2017-01-01

    The increasing number and severity of floods, driven by phenomena such as urbanization, deforestation, subsidence and climate change, create a growing need for accurate and timely flood maps. In this paper we present and evaluate a method to create deterministic and probabilistic flood maps from

  18. Probabilistic flood extent estimates from social media flood observations

    NARCIS (Netherlands)

    Brouwer, Tom; Eilander, Dirk; Van Loenen, Arnejan; Booij, Martijn J.; Wijnberg, Kathelijne M.; Verkade, Jan S.; Wagemaker, Jurjen

    2017-01-01

    The increasing number and severity of floods, driven by phenomena such as urbanization, deforestation, subsidence and climate change, creates a growing need for accurate and timely flood maps. This research focussed on creating flood maps using user generated content from Twitter. Twitter data has

  19. Improving Global Flood Forecasting using Satellite Detected Flood Extent

    NARCIS (Netherlands)

    Revilla Romero, B.

    2016-01-01

    Flooding is a natural global phenomenon but in many cases is exacerbated by human activity. Although flooding generally affects humans in a negative way, bringing death, suffering, and economic impacts, it also has potentially beneficial effects. Early flood warning and forecasting systems, as well

  20. The principle of proportionality in water pollution control during mine flooding; Gewaesserguetewirtschaftliche Beurteilungskriterien bei der Grubenflutung

    Energy Technology Data Exchange (ETDEWEB)

    Reincke, H. [WEG Wasserguetestelle Elbe, Hamburg (Germany)

    2001-07-01

    The Wismut remediation project comprised the sanitation of large surfaces of contaminated land in Saxony and Thuringia. About 1,400 km of underground mines and 56 shafts were flooded. The contribution presents a critical discussion of the potential and limits of the flooding process and its economic aspects in consideration of legal specifications. [German] Das Wismut-Sanierungsprojekt beinhaltet die Sanierung der grossflaechig radioaktiv kontaminierten Wismut-Altlasten in Sachsen und Thueringen mit dem Ziel die Uranerzbergbau- und -aufbereitungsbetriebe stillzulegen und die Betriebsflaechen zu sanieren, um sie wieder nutzbar zu machen. Ein wesentlicher Schwerpunkt besteht dabei in der Verwahrung und Flutung vorhandener Gruben, die fuer den untertaegigen Abbau der Erze genutzt wurden und aus rund 1.400 km offenen Grubenbauen und 56 Tagesschaechten bestehen. Dieses weitverzweigte untertaegige Netz von Stollen, Schaechten und Kammern sollte moeglichst rasch ausser Betrieb genommen und fuer die Flutung (Endverwahrung) vorbereitet werden. Dabei stellt die Flutung die umweltvertraeglichste, technisch sicherste und zugleich kostenguenstigste Sanierungsvariante dar. Die Moeglichkeiten und Grenzen zur Beanspruchung der oeffentlichen Vorflut fuer die Grubenwaesser unter Wuerdigung oekonomisch vertretbarer Loesungen im wasserrechtlichen Vollzug werden im Folgenden einer kritischen Betrachtung unterzogen und zur Diskussion gestellt. (orig.)

  1. Flood Risk Characterization for the Eastern United States

    Science.gov (United States)

    Villarini, G.; Smith, J. A.; Ntelekos, A. A.

    2009-04-01

    Tropical cyclones landfalling in the eastern United States pose a major risk for insured property and can lead to extensive damage through storm surge flooding, inland flooding or extreme windspeeds. Current hurricane cat-models do not include calculations of inland flooding from the outer rainfall bands of tropical cyclones but the issue is becoming increasingly important for commercial insurance risk assessment. The results of this study could be used to feed into the next generation of hurricane cat-models and assist in the calculation of damages from inland hurricane flood damage. Annual maximum peak discharge records from more than 400 stations in the eastern United States with at least 75 years of record to examine the role of landfalling tropical cyclones in controlling the upper tail of inland flood risk for the eastern United States. In addition to examining tropical cyclone inland flood risk at specific locations, the spatial extent of extreme flooding from lanfalling tropical cyclones is analyzed. Analyses of temporal trends and abrupt changes in the mean and variance of annual flood peaks are performed. Change-point analysis is performed using the non-parametric Pettitt test. Two non-parametric (Mann-Kendall and Spearman) tests and one parametric (Pearson) test are applied to detect the presence of temporal trends. Flood risk characterization centers on assessments of the spatial variation in "upper tail" properties of annual flood peak distributions. The modeling framework for flood frequency analysis is provided by the Generalized Additive Models for Location Scale and Shape (GAMLSS).

  2. Flash flood characterisation of the Haor area of Bangladesh

    Science.gov (United States)

    Bhattacharya, B.; Suman, A.

    2012-04-01

    Haors are large bowl-shaped flood plain depressions located mostly in north-eastern part of Bangladesh covering about 25% of the entire region. During dry season haors are used for agriculture and during rainy season it is used as fisheries. Haors have profound ecological importance. About 8000 migratory wild birds visit the area annually. Some of the haors are declared at Ramsar sites. Haors are frequently affected by the flash floods due to hilly topography and steep slope of the rivers draining the area. These flash floods spill onto low-lying flood plain lands in the region, inundating crops, damaging infrastructure by erosion and often causing loss of lives and properties. Climate change is exacerbating the situation. For appropriate risk mitigation mechanism it is necessary to explore flood characteristics of that region. The area is not at all studied well. Under a current project a numerical 1D2D model based on MIKE Flood is developed to study the flooding characteristics and estimate the climate change impacts on the haor region. Under this study the progression of flood levels at some key haors in relation to the water level data at specified gauges in the region is analysed. As the region is at the border with India so comparing with the gauges at the border with India is carried out. The flooding in the Haor area is associated with the rainfall in the upstream catchment in India (Meghalaya, Barak and Tripura basins in India). The flood propagation in some of the identified haors in relation to meteorological forcing in the three basins in India is analysed as well. Subsequently, a ranking of haors is done based on individual risks. Based on the IPCC recommendation the precipitation scenario in the upstream catchments under climate change is considered. The study provides the fundamental inputs for preparing a flood risk management plan of the region.

  3. Understanding Flood Seasonality and Its Temporal Shifts within the Contiguous United States

    Energy Technology Data Exchange (ETDEWEB)

    Ye, Sheng [Institute of Hydrology and Water Resources, School of Civil Engineering, Zhejiang University, Hangzhou, China; Li, Hong-Yi [Pacific Northwest National Laboratory, Richland, Washington; Leung, L. Ruby [Pacific Northwest National Laboratory, Richland, Washington; Guo, Jiali [College of Civil and Hydropower Engineering, China Three Gorges University, Yichang, China; State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan, China; Ran, Qihua [Institute of Hydrology and Water Resources, School of Civil Engineering, Zhejiang University, Hangzhou, China; Demissie, Yonas [Department of Civil and Environmental Engineering, Washington State University Tri-Cities, Richland, Washington; Sivapalan, Murugesu [Department of Geography and Geographic Information Science, University of Illinois at Urbana–Champaign, Champaign, Illinois; Department of Civil and Environmental Engineering, University of Illinois at Urbana–Champaign, Urbana, Illinois

    2017-07-01

    Understanding the causes of flood seasonality is critical for better flood management. This study examines the seasonality of annual maximum floods (AMF) and its changes before and after 1980 at over 250 natural catchments across the contiguous United States. Using circular statistics to define a seasonality index, our analysis focuses on the variability of the flood occurrence date. Generally, catchments with more synchronized seasonal water and energy cycles largely inherit their seasonality of AMF from that of annual maximum rainfall (AMR). In contrast, the seasonality of AMF in catchments with loosely synchronized water and energy cycles are more influenced by high antecedent storage, which is responsible for the amplification of the seasonality of AMF over that of AMR. This understanding then effectively explains a statistically significant shift of flood seasonality detected in some catchments in the recent decades. Catchments where the antecedent soil water storage has increased since 1980 exhibit increasing flood seasonality while catchments that have experienced increases in storm rainfall before the floods have shifted towards floods occurring more variably across the seasons. In the eastern catchments, a concurrent widespread increase in event rainfall magnitude and reduced soil water storage have led to a more variable timing of floods. Our findings of the role of antecedent storage and event rainfall on the flood seasonality provide useful insights for understanding future changes in flood seasonality as climate models projected changes in extreme precipitation and aridity over land.

  4. Unstructured mesh adaptivity for urban flooding modelling

    Science.gov (United States)

    Hu, R.; Fang, F.; Salinas, P.; Pain, C. C.

    2018-05-01

    Over the past few decades, urban floods have been gaining more attention due to their increase in frequency. To provide reliable flooding predictions in urban areas, various numerical models have been developed to perform high-resolution flood simulations. However, the use of high-resolution meshes across the whole computational domain causes a high computational burden. In this paper, a 2D control-volume and finite-element flood model using adaptive unstructured mesh technology has been developed. This adaptive unstructured mesh technique enables meshes to be adapted optimally in time and space in response to the evolving flow features, thus providing sufficient mesh resolution where and when it is required. It has the advantage of capturing the details of local flows and wetting and drying front while reducing the computational cost. Complex topographic features are represented accurately during the flooding process. For example, the high-resolution meshes around the buildings and steep regions are placed when the flooding water reaches these regions. In this work a flooding event that happened in 2002 in Glasgow, Scotland, United Kingdom has been simulated to demonstrate the capability of the adaptive unstructured mesh flooding model. The simulations have been performed using both fixed and adaptive unstructured meshes, and then results have been compared with those published 2D and 3D results. The presented method shows that the 2D adaptive mesh model provides accurate results while having a low computational cost.

  5. Long-term effects of flooding on mortality in England and Wales, 1994-2005: controlled interrupted time-series analysis

    Science.gov (United States)

    2011-01-01

    Background Limited evidence suggests that being flooded may increase mortality and morbidity among affected householders not just at the time of the flood but for months afterwards. The objective of this study is to explore the methods for quantifying such long-term health effects of flooding by analysis of routine mortality registrations in England and Wales. Methods Mortality data, geo-referenced by postcode of residence, were linked to a national database of flood events for 1994 to 2005. The ratio of mortality in the post-flood year to that in the pre-flood year within flooded postcodes was compared with that in non-flooded boundary areas (within 5 km of a flood). Further analyses compared the observed number of flood-area deaths in the year after flooding with the number expected from analysis of mortality trends stratified by region, age-group, sex, deprivation group and urban-rural status. Results Among the 319 recorded floods, there were 771 deaths in the year before flooding and 693 deaths in the year after (post-/pre-flood ratio of 0.90, 95% CI 0.82, 1.00). This ratio did not vary substantially by age, sex, population density or deprivation. A similar post-flood 'deficit' of deaths was suggested by the analyses based on observed/expected deaths. Conclusions The observed post-flood 'deficit' of deaths is counter-intuitive and difficult to interpret because of the possible influence of population displacement caused by flooding. The bias that might arise from such displacement remains unquantified but has important implications for future studies that use place of residence as a marker of exposure. PMID:21288358

  6. Long-term effects of flooding on mortality in England and Wales, 1994-2005: controlled interrupted time-series analysis

    Directory of Open Access Journals (Sweden)

    Leonardi Giovanni

    2011-02-01

    Full Text Available Abstract Background Limited evidence suggests that being flooded may increase mortality and morbidity among affected householders not just at the time of the flood but for months afterwards. The objective of this study is to explore the methods for quantifying such long-term health effects of flooding by analysis of routine mortality registrations in England and Wales. Methods Mortality data, geo-referenced by postcode of residence, were linked to a national database of flood events for 1994 to 2005. The ratio of mortality in the post-flood year to that in the pre-flood year within flooded postcodes was compared with that in non-flooded boundary areas (within 5 km of a flood. Further analyses compared the observed number of flood-area deaths in the year after flooding with the number expected from analysis of mortality trends stratified by region, age-group, sex, deprivation group and urban-rural status. Results Among the 319 recorded floods, there were 771 deaths in the year before flooding and 693 deaths in the year after (post-/pre-flood ratio of 0.90, 95% CI 0.82, 1.00. This ratio did not vary substantially by age, sex, population density or deprivation. A similar post-flood 'deficit' of deaths was suggested by the analyses based on observed/expected deaths. Conclusions The observed post-flood 'deficit' of deaths is counter-intuitive and difficult to interpret because of the possible influence of population displacement caused by flooding. The bias that might arise from such displacement remains unquantified but has important implications for future studies that use place of residence as a marker of exposure.

  7. Risk-based flood-planning strategy for Vermont's roadway network.

    Science.gov (United States)

    2015-06-01

    In this project, the authors extend the use of a previously established measure of link-specific criticality, the Network Robustness Index (NRI), to address disruptions in Vermonts federal-aid road network caused by summertime flooding. The goal o...

  8. Flood Label for buildings : a tool for more flood-resilient cities

    NARCIS (Netherlands)

    Hartmann, T.; Scheibel, Marc

    2016-01-01

    River floods are among the most expensive natural disasters in Europe. Traditional flood protection methods are not sufficient anymore. It is widely acknowledged in the scholarly debate and in practice of flood risk management that traditional flood protection measures such as dikes need to be

  9. Flood disaster and protection measures in Turkey Case Study: May 1998 flood disaster at North Western Black Sea Region of Turkey

    International Nuclear Information System (INIS)

    Gurer, Ibrahim; Ozguier, Hamza

    2004-01-01

    Due to geographical location, geology, and topography, Turkey undergoes three main types of natural disasters related to gravity flows; floods, landslides, and snow avalanches. Flooding is second important natural hazard after earthquakes with 18 floods and 23 deaths per year, on average. During 20-21 May 1998, the rainfall which was equal to about four times of long-term mean annual rainfall total of north western Black Sea geographical region of Turkey affected 35.000 m 2 , damaged 1300 km highway, 600 km roads to the villages, and 60 km railway. After the recession of the flood waters, the field survey done proved that 12 highway bridges, 91 small bridges on village roads and 6900 highway culverts, 13.800 m retaining wall and about 500 houses were severely damaged. During the last five years, with the loans and credits provided by World Bank, a series of flood protection structures were designed and built for the rehabilitation of the region. Mostly concentrating on non-structural flood protection studies, a work programme has been drafted in this framework to develop flood management and to reduce or eliminate long-term risk and damage to people and their property from natural hazards and their effects. In this case study, the factors causing the flood disaster are given, and the flood event is analyzed from hydrologic and morphologic points of view. Also the different types of the flood protection measures are exemplified and the experience gained in controlling the flood damages is presented.(Author)

  10. Flood characteristics of the Haor area in Bangladesh

    Science.gov (United States)

    Suman, Asadusjjaman; Bhattacharya, Biswa

    2013-04-01

    In recent years the world has experienced deaths, large-scale displacement of people, billions of Euros of economic damage, mental stress and ecosystem impacts due to flooding. Global changes (climate change, population and economic growth, and urbanisation) are exacerbating the severity of flooding. The 2010 floods in Pakistan and the 2011 floods in Australia and Thailand demonstrate the need for concerted action in the face of global societal and environmental changes to strengthen resilience against flooding. Bangladesh is a country, which is frequently suffering from flooding. The current research is conducted in the framework of a project, which focuses on the flooding issues in the Haor region in the north-east of Bangladesh. A haor is a saucer-shaped depression, which is used during the dry period (December to mid-May) for agriculture and as a fishery during the wet period (June-November), and thereby presents a very interesting socio-economic perspective of flood risk management. Pre-monsoon flooding till mid-May causes agricultural loss and lot of distress whereas monsoon flooding brings benefits. The area is bordering India, thereby presenting trans-boundary issues as well, and is fed by some flashy Indian catchments. The area is drained mainly through the Surma-Kushiyara river system. The terrain generally is flat and the flashy characteristics die out within a short distance from the border. Limited studies on the region, particularly with the help of numerical models, have been carried out in the past. Therefore, an objective of the current research was to set up numerical models capable of reasonably emulating the physical system. Such models could, for example, associate different gauges to the spatio-temporal variation of hydrodynamic variables and help in carrying out a systemic study on the impact of climate changes. A 1D2D model, with one-dimensional model for the rivers (based on MIKE 11 modelling tool from Danish Hydraulic Institute) and a two

  11. Mercury exports from a High-Arctic river basin in Northeast Greenland (74°N) largely controlled by glacial lake outburst floods

    DEFF Research Database (Denmark)

    Søndergaard, Jens; Tamstorf, Mikkel P.; Elberling, Bo

    2015-01-01

    .025 mg kg(-1). Temporal variations in river Hg were mainly associated with snowmelt, sudden erosion events, and outburst floods from a glacier-dammed lake in the upper part of the ZRB. Annual Hg exports from the 514 km(2) ZRB varied from 0.71 to >1.57 kg and the majority (86-96 was associated...... with sediment-bound Hg. Hg yields from the ZRB varied from 1.4-3.1 g Hg km(-2) yr(-1) and were among the highest yields reported from Arctic river basins. River exports of Hg from ZRB were found to be largely controlled by the frequency, magnitude and timing of the glacial lake outburst floods, which occurred...... in four of the five years in July-August. Floods accounted for 5 to >10% of the annual water discharge, and up to >31% of the annual Hg export. Also, the winter snowfall and the summer temperatures were found to be important indirect controls on the annual Hg export. The occurrence and timing of glacial...

  12. Assessment of vulnerability to extreme flash floods in design storms.

    Science.gov (United States)

    Kim, Eung Seok; Choi, Hyun Il

    2011-07-01

    There has been an increase in the occurrence of sudden local flooding of great volume and short duration caused by heavy or excessive rainfall intensity over a small area, which presents the greatest potential danger threat to the natural environment, human life, public health and property, etc. Such flash floods have rapid runoff and debris flow that rises quickly with little or no advance warning to prevent flood damage. This study develops a flash flood index through the average of the same scale relative severity factors quantifying characteristics of hydrographs generated from a rainfall-runoff model for the long-term observed rainfall data in a small ungauged study basin, and presents regression equations between rainfall characteristics and the flash flood index. The aim of this study is to develop flash flood index-duration-frequency relation curves by combining the rainfall intensity-duration-frequency relation and the flash flood index from probability rainfall data in order to evaluate vulnerability to extreme flash floods in design storms. This study is an initial effort to quantify the flash flood severity of design storms for both existing and planned flood control facilities to cope with residual flood risks due to extreme flash floods that have ocurred frequently in recent years.

  13. GSM and web-based flood monitoring system

    International Nuclear Information System (INIS)

    Pagatpat, J C; Arellano, A C; Gerasta, O J

    2015-01-01

    The purpose of this project is to develop a local real-time river flood monitoring and warning system for the selected communities near Mandulog River. This study focuses only on the detection and early warning alert system (via website and/or cell phone text messages) that alerts local subscribers of potential flood events. Furthermore, this system is interactive wherein all non-registered subscribers could inquire the actual water level of the desired area location they want to monitor. An estimated time a particular river waterway will overflow is also included in the analyses. The hardware used in the design is split into several parts namely: the water level detector, GSM module, and microcontroller development board. (paper)

  14. The Kassel concept for river flood defence

    Energy Technology Data Exchange (ETDEWEB)

    Toensmann, F. [Kassel Univ. (Germany). Dept. of Hydraulic and Water-Resources Engineering

    2000-07-01

    Following an introduction referring to the history, the regulation of ''interference and compensation'' and the ''sustainable development'' as the foundation of future-oriented flood defence concepts are dealt with. The position of science and technology with respect to the employed planning methods: Models for the determination of spatial and temporal distribution of maximum precipitation, river basin models, methods for water level computation, benefit/cost analysis and environmental assessment are described and evaluated. Thereafter the Kassel Concept for River Flood Defence is presented. The basic principle is a mosaic of de-central, semi-central and central measures with reference to the specific project which are economically eligible and environment-compatible. (orig.)

  15. Susquehanna River Basin Flood Control Review Study

    Science.gov (United States)

    1980-08-01

    and made recommendations for an intergrated water plan for the Basin and included a specific Early Action Plan. Concerning flood damage reduction, the...transportation and by agriculture as a source of income and occupation. The river served as a source of transportation for trade and commerce and also as a... trade patterns, and labor market areas. The Susquehanna River Basin is largely comprised of BEA economic areas 011, 012, 013, and 016. Figure II shows the

  16. Multi-objective sustainable river management: balancing flood control, bio-pysical restoration and socio-economic factors in a Scottish river

    Science.gov (United States)

    Moir, H.; Bowles, C.; Campbell, C.; Sawyer, A.; Comins, L.; Werritty, A.

    2010-12-01

    The sustainable management of river corridors requires an understanding of the linkages between geomorphic, hydrologic, ecologic and socio-economic factors across a hierarchy of spatial and temporal scales. Therefore, in order to be genuinely sustainable, management must ideally be set within a catchment/watershed context. However, in practice, this rarely occurs due to obstacles imposed by fragmented land ownership/governance and an incomplete understanding of bio-physical process linkages. We present our experience on a project with the goal of optimising physical objectives at the catchment scale within a framework influenced by environmental legislation and conflicting land-use pressures. The project was carried out on the Eddleston Water in the Scottish Borders and had the primary objective of providing sustainable flood risk management to settlements on the water course while also providing ecological benefit to the river corridor. These co-objectives had to be met while considering the constraints imposed by land-use (predominantly arable agriculture) and transport infrastructure on the floodplain. The Eddleston Water has been heavily impacted by many human activities for over 200 years although a modified upland drainage, markedly canalised main-stem channel and floodplain disconnection are most significant to present-day physical and ecological processes. Catchment-scale restoration plans aim to restore broad-scale hydrological processes in conjunction with re-naturalisation of the river corridor at the reach-scale (including floodbank set-back, floodplain reconnection, regeneration of riparian vegetation, large wood placement). In addition, these measures also had to accommodate the objective of sustainable flood risk management, through the combination of a re-naturalised run-off regime and the encouragement of floodplain water storage. We present the output from 1D and 2D hydraulic models of a 1km stretch of the Eddleston Water that jointly assesses the

  17. Conjunctively optimizing flash flood control and water quality in urban water reservoirs by model predictive control and dynamic emulation

    Science.gov (United States)

    Galelli, Stefano; Goedbloed, Albert; Schmitter, Petra; Castelletti, Andrea

    2014-05-01

    Urban water reservoirs are a viable adaptation option to account for increasing drinking water demand of urbanized areas as they allow storage and re-use of water that is normally lost. In addition, the direct availability of freshwater reduces pumping costs and diversifies the portfolios of drinking water supply. Yet, these benefits have an associated twofold cost. Firstly, the presence of large, impervious areas increases the hydraulic efficiency of urban catchments, with short time of concentration, increased runoff rates, losses of infiltration and baseflow, and higher risk of flash floods. Secondly, the high concentration of nutrients and sediments characterizing urban discharges is likely to cause water quality problems. In this study we propose a new control scheme combining Model Predictive Control (MPC), hydro-meteorological forecasts and dynamic model emulation to design real-time operating policies that conjunctively optimize water quantity and quality targets. The main advantage of this scheme stands in its capability of exploiting real-time hydro-meteorological forecasts, which are crucial in such fast-varying systems. In addition, the reduced computational requests of the MPC scheme allows coupling it with dynamic emulators of water quality processes. The approach is demonstrated on Marina Reservoir, a multi-purpose reservoir located in the heart of Singapore and characterized by a large, highly urbanized catchment with a short (i.e. approximately one hour) time of concentration. Results show that the MPC scheme, coupled with a water quality emulator, provides a good compromise between different operating objectives, namely flood risk reduction, drinking water supply and salinity control. Finally, the scheme is used to assess the effect of source control measures (e.g. green roofs) aimed at restoring the natural hydrological regime of Marina Reservoir catchment.

  18. BOT schemes as financial model of hydro power projects

    International Nuclear Information System (INIS)

    Grausam, A.

    1997-01-01

    Build-operate-transfer (BOT) schemes are the latest methods adopted in the developing infrastructure projects. This paper outlines the project financing through BOT schemes and briefly focuses on the factors particularly relevant to hydro power projects. Hydro power development provides not only the best way to produce electricity, it can also solve problems in different fields, such as navigation problems in case of run-of-the river plants, ground water management systems and flood control etc. This makes HPP projects not cheaper, but hydro energy is a clean and renewable energy and the hydro potential worldwide will play a major role to meet the increased demand in future. 5 figs

  19. Flooding in imagination vs flooding in vivo: A comparison with agoraphobics

    NARCIS (Netherlands)

    Emmelkamp, Paul M.G.; Wessels, Hemmy

    In this investigation of agoraphobic patients, 3 different flooding procedures were compared: (1) prolonged exposure in vivo, (2) flooding in the imagination by a ‘live’ therapist and (3) a combination of flooding in the imagination and flooding in vivo. After an intermediate-test all clients were

  20. Tangible Results and Progress in Flood Risks Management with the PACTES Initiative

    Science.gov (United States)

    Costes, Murielle; Abadie, Jean-Paul; Ducuing, Jean-Louis; Denier, Jean-Paul; Stéphane

    The PACTES project (Prévention et Anticipation des Crues au moyen des Techniques Spatiales), initiated by CNES and the French Ministry of Research, aims at improving flood risk management, over the following three main phases : - Prevention : support and facilitate the analysis of flood risks and socio-economic impacts (risk - Forecasting and alert : improve the capability to predict and anticipate the flooding event - Crisis management : allow better situation awareness, communication and sharing of In order to achieve its ambitious objectives, PACTES: - integrates state-of-the-art techniques and systems (integration of the overall processing chains, - takes advantage of integrating recent model developments in wheather forecasting, rainfall, In this approach, space technology is thus used in three main ways : - radar and optical earth observation data are used to produce Digital Elevation Maps, land use - earth observation data are also an input to wheather forecasting, together with ground sensors; - satellite-based telecommunication and mobile positioning. Started in December 2000, the approach taken in PACTES is to work closely with users such as civil security and civil protection organisms, fire fighter brigades and city councils for requirements gathering and during the validation phase. It has lead to the development and experimentation of an integrated pre-operational demonstrator, delivered to different types of operational users. Experimentation has taken place in three watersheds representative of different types of floods (flash and plain floods). After a breaf reminder of what the PACTES project organization and aims are, the PACTES integrated pre-operational demonstrator is presented. The main scientific inputs to flood risk management are summarized. Validation studies for the three watersheds covered by PACTES (Moselle, Hérault and Thoré) are detailed. Feedback on the PACTES tangible results on flood risk management from an user point of view

  1. Surfactant loss control in chemical flooding spectroscopic and calorimetric study of adsorption and precipitation on reservoir minerals. Annual report, September 30, 1992--September 30 1995

    Energy Technology Data Exchange (ETDEWEB)

    Casteel, J. [Bartlesville Project Office, OK (United States)

    1996-07-01

    The aim of this research project was to investigate mechanisms governing adsorption and surface precipitation of flooding surfactants on reservoir minerals. Effects of surfactant structure, surfactant combinations, various inorganic and polymeric species, and solids mineralogy have been determined. A multi-pronged approach consisting of micro & nano spectroscopy, electrokinetics, surface tension and wettability is used in this study. The results obtained should help in controlling surfactant loss in chemical flooding and in developing optimum structures and conditions for efficient chemical flooding processes. During the three years contract period, adsorption of single surfactants and select surfactant mixtures was studied at the solid-liquid and gas-liquid interfaces. Alkyl xylene sulfonates, polyethoxylated alkyl phenols, octaethylene glycol mono n-decyl ether, and tetradecyl trimethyl ammonium chloride were the surfactants studied. Adsorption of surfactant mixtures of varying composition was also investigated. The microstructure of the adsorbed layer was characterized using fluorescence spectroscopy. Changes in interfacial properties such as wettability, electrokinetics and stability of reservoir minerals were correlated with the amounts of reagent adsorbed. Strong effects of the structure of the surfactant and position of functional groups were revealed. Changes of microstructure upon dilution (desorption) were also studied. Presence of the nonionic surfactants in mixed aggregate leads to shielding of the charge of ionic surfactants which in turn promotes aggregation but reduced electrostatic attraction between the charged surfactant and the mineral surface. Strong consequences of surfactant interactions in solution on adsorption as well as correlations between monomer concentration in mixtures and adsorption were revealed.

  2. Actionable Science for Sea Level Rise and Coastal Flooding to Help Avoid Maladaptation

    Science.gov (United States)

    Buchanan, M. K.

    2017-12-01

    Rising sea levels increase the frequency of flooding at all levels, from nuisance to extreme, along coastlines across the world. Although recent flooding has increased the saliency of sea level rise (SLR) and the risks it presents to governments and communities, the effect of SLR on coastal hazards is complex and filled with uncertainty that is often uncomfortable for decision-makers. Although it is certain that SLR is occurring and will continue, its rate remains ambiguous. Because extreme flooding is by definition rare, there is also uncertainty in the effect of natural variability on flood frequency. These uncertainties pose methodological obstacles for integrating SLR into flood hazard projections and risk management. A major challenge is how to distill this complexity into information geared towards public sectors to help inform adaptation decision-making. Because policy windows are limited, budgets are tight, and decisions may have long-term consequences, it is especially important that this information accounts for uncertainty to help avoid damage and maladaptation. The U.S. Global Research Program, and others, describe this type of science—data and tools that help decision-makers plan for climate change impacts—as actionable [1]. We produce actionable science to support decision-making for adaptation to coastal impacts, despite uncertainty in projections of SLR and flood frequency. We found that SLR will boost the occurrence of minor rather than severe flooding in some regions of the U.S., while in other regions the reverse is true. For many cities, the current ten-year flood level will become a regular occurrence as the century progresses and by 2100 will occur every few days for some cities. This creates a mismatch with current planning in some cases. For example, a costly storm surge barrier may be built to protect parts of New York City from extreme flood levels but these are not often used because they are expensive to operate and obstructive to

  3. Effects of flood control alternatives on fish and wildlife resources of the Malheur-Harney lakes basin

    Science.gov (United States)

    Hamilton, David B.; Auble, Gregor T.; Ellison, Richard A.; Roelle, James E.

    1985-01-01

    Malheur Lake is the largest freshwater marsh in the western contiguous United States and is one of the main management units of the Malheur National Wildlife Refuge in southeastern Oregon. The marsh provides excellent waterfowl production habitat as well as vital migration habitats for birds in the Pacific flyway. Water shortages have typically been a problem in this semiarid area; however, record snowfalls and cool summers have recently caused Malheur Lake to rise to its highest level in recorded history. This has resulted in the loss of approximately 57,000 acres of important wildlife habitat as well as extensive flooding of local ranches, roads, and railroad lines. Because of the importance of the Refuge, any water management plan for the Malheur-Harney Lakes Basin needs to consider the impact of management alternatives on the hydrology of Malheur Lake. The facilitated modeling workshop described in this report was conducted January 14-18, 1985, under the joint sponsorship of the Portland Ecological Services Field Office and the Malheur National Wildlife Refuge, Region 1, U.S. Fish and Wildlife Service (FWS). The Portland Field Office is responsible for FWS reporting requirements on Federal water resource projects while the Refuge staff has management responsibility for much of the land affected by high water levels in the Malheur-Harney Lakes Basin. The primary objective of the workshop was to begin gathering and analyzing information concerning potential fish and wildlife impacts, needs, and opportunities associated with proposed U.S. Army Corps of Engineers (COE) flood control alternatives for Malheur Lake. The workshop was structured around the formulation of a computer model that would simulate the hydrologic effects of the various alternatives and any concommitant changes in vegetation communities and wildlife use patterns. The simulation model is composed of three connected submodels. The Hydrology submodel calculates changes in lake volume, elevation

  4. Damage assessment methodology for vehicles exposed to flooding in urban areas

    Directory of Open Access Journals (Sweden)

    E. Martínez Gomariz

    2017-10-01

    Full Text Available Urban floods may provoke important damages to vehicles, usually not taken into account within most studies related to urban flood risks damage assessments. Herein a methodology to estimate damages to vehicles exposed to urban floods is presented. After a state-of-the-art review, the most recent damage curves for vehicles developed by the U.S. Army Corps of Engineers (USACE, 2009 are presented as the best adaptive and the most comprehensively performed so far. The proposed methodology is applied to the Spanish municipality of Badalona, framed in the H2020 European Project BINGO. In order to conduct this methodology some aspects such as the vehicular distribution are analyzed within the study area. Finally, Expected Annual Damage (EAD for flooded vehicles is calculated based on inundations related to design storms of different return periods (1, 10, 100 and 500 years.

  5. Project control integrating cost and schedule in construction

    CERN Document Server

    Del Pico, Wayne J

    2013-01-01

    The key to successful project control is the fusing of cost to schedule whereby the management of one helps to manage the other. Project Control: Integrating Cost and Schedule in Construction explores the reasons behind and the methodologies for proper planning, monitoring, and controlling both project costs and schedule. Filling a current void the topic of project control applied to the construction industry, it is essential reading for students and professionals alike.

  6. 44 CFR 78.10 - Project grant approval process.

    Science.gov (United States)

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.10 Project grant approval process. The State POC will solicit applications from...

  7. Evaluation of Insect Defoliation in Baldcypress and Its Relationship to Flooding

    National Research Council Canada - National Science Library

    Goyer, Richard

    1996-01-01

    This project was undertaken to delineate the extent of defoliation of baldcypress and to compare defoliation and refoliation rates under different flooding regimes in naturally occurring field situations...

  8. Flooding and Schools

    Science.gov (United States)

    National Clearinghouse for Educational Facilities, 2011

    2011-01-01

    According to the Federal Emergency Management Agency, flooding is the nation's most common natural disaster. Some floods develop slowly during an extended period of rain or in a warming trend following a heavy snow. Flash floods can occur quickly, without any visible sign of rain. Catastrophic floods are associated with burst dams and levees,…

  9. Maximum flood hazard assessment for OPG's deep geologic repository for low and intermediate level waste

    International Nuclear Information System (INIS)

    Nimmrichter, P.; McClintock, J.; Peng, J.; Leung, H.

    2011-01-01

    Ontario Power Generation (OPG) has entered a process to seek Environmental Assessment and licensing approvals to construct a Deep Geologic Repository (DGR) for Low and Intermediate Level Radioactive Waste (L&ILW) near the existing Western Waste Management Facility (WWMF) at the Bruce nuclear site in the Municipality of Kincardine, Ontario. In support of the design of the proposed DGR project, maximum flood stages were estimated for potential flood hazard risks associated with coastal, riverine and direct precipitation flooding. The estimation of lake/coastal flooding for the Bruce nuclear site considered potential extreme water levels in Lake Huron, storm surge and seiche, wind waves, and tsunamis. The riverine flood hazard assessment considered the Probable Maximum Flood (PMF) within the local watersheds, and within local drainage areas that will be directly impacted by the site development. A series of hydraulic models were developed, based on DGR project site grading and ditching, to assess the impact of a Probable Maximum Precipitation (PMP) occurring directly at the DGR site. Overall, this flood assessment concluded there is no potential for lake or riverine based flooding and the DGR area is not affected by tsunamis. However, it was also concluded from the results of this analysis that the PMF in proximity to the critical DGR operational areas and infrastructure would be higher than the proposed elevation of the entrance to the underground works. This paper provides an overview of the assessment of potential flood hazard risks associated with coastal, riverine and direct precipitation flooding that was completed for the DGR development. (author)

  10. A new flood type classification method for use in climate change impact studies

    Directory of Open Access Journals (Sweden)

    Thea Turkington

    2016-12-01

    Full Text Available Flood type classification is an optimal tool to cluster floods with similar meteorological triggering conditions. Under climate change these flood types may change differently as well as new flood types develop. This paper presents a new methodology to classify flood types, particularly for use in climate change impact studies. A weather generator is coupled with a conceptual rainfall-runoff model to create long synthetic records of discharge to efficiently build an inventory with high number of flood events. Significant discharge days are classified into causal types using k-means clustering of temperature and precipitation indicators capturing differences in rainfall amount, antecedent rainfall and snow-cover and day of year. From climate projections of bias-corrected temperature and precipitation, future discharge and associated change in flood types are assessed. The approach is applied to two different Alpine catchments: the Ubaye region, a small catchment in France, dominated by rain-on-snow flood events during spring, and the larger Salzach catchment in Austria, affected more by rainfall summer/autumn flood events. The results show that the approach is able to reproduce the observed flood types in both catchments. Under future climate scenarios, the methodology identifies changes in the distribution of flood types and characteristics of the flood types in both study areas. The developed methodology has potential to be used flood impact assessment and disaster risk management as future changes in flood types will have implications for both the local social and ecological systems in the future.

  11. A Multimethod Approach towards Assessing Urban Flood Patterns and Its Associated Vulnerabilities in Singapore

    Directory of Open Access Journals (Sweden)

    Winston T. L. Chow

    2016-01-01

    Full Text Available We investigated flooding patterns in the urbanised city-state of Singapore through a multimethod approach combining station precipitation data with archival newspaper and governmental records; changes in flash floods frequencies or reported impacts of floods towards Singapore society were documented. We subsequently discussed potential flooding impacts in the context of urban vulnerability, based on future urbanisation and forecasted precipitation projections for Singapore. We find that, despite effective flood management, (i significant increases in reported flash flood frequency occurred in contemporary (post-2000 relative to preceding (1984–1999 periods, (ii these flash floods coincide with more localised, “patchy” storm events, (iii storms in recent years are also more intense and frequent, and (iv floods result in low human casualties but have high economic costs via insurance damage claims. We assess that Singapore presently has low vulnerability to floods vis-à-vis other regional cities largely due to holistic flood management via consistent and successful infrastructural development, widespread flood monitoring, and effective advisory platforms. We conclude, however, that future vulnerabilities may increase from stresses arising from physical exposure to climate change and from demographic sensitivity via rapid population growth. Anticipating these changes is potentially useful in maintaining the high resilience of Singapore towards this hydrometeorological hazard.

  12. Effect of Urban Green Spaces and Flooded Area Type on Flooding Probability

    Directory of Open Access Journals (Sweden)

    Hyomin Kim

    2016-01-01

    Full Text Available Countermeasures to urban flooding should consider long-term perspectives, because climate change impacts are unpredictable and complex. Urban green spaces have emerged as a potential option to reduce urban flood risks, and their effectiveness has been highlighted in notable urban water management studies. In this study, flooded areas in Seoul, Korea, were divided into four flooded area types by cluster analysis based on topographic and physical characteristics and verified using discriminant analysis. After division by flooded area type, logistic regression analysis was performed to determine how the flooding probability changes with variations in green space area. Type 1 included regions where flooding occurred in a drainage basin that had a flood risk management infrastructure (FRMI. In Type 2, the slope was steep; the TWI (Topographic Wetness Index was relatively low; and soil drainage was favorable. Type 3 represented the gentlest sloping areas, and these were associated with the highest TWI values. In addition, these areas had the worst soil drainage. Type 4 had moderate slopes, imperfect soil drainage and lower than average TWI values. We found that green spaces exerted a considerable influence on urban flooding probabilities in Seoul, and flooding probabilities could be reduced by over 50% depending on the green space area and the locations where green spaces were introduced. Increasing the area of green spaces was the most effective method of decreasing flooding probability in Type 3 areas. In Type 2 areas, the maximum hourly precipitation affected the flooding probability significantly, and the flooding probability in these areas was high despite the extensive green space area. These findings can contribute towards establishing guidelines for urban spatial planning to respond to urban flooding.

  13. Reactor safety under design basis flood condition for inland sites

    International Nuclear Information System (INIS)

    Hajela, S.; Bajaj, S.S.; Samota, A.; Verma, U.S.P.; Warudkar, A.S.

    2002-01-01

    Full text: In June 1994, there was an incident of flooding at Kakrapar Atomic Power Station (KAPS) due to combination of heavy rains and mechanical failure in the operation of gates at the adjoining weir. An indepth review of the incident was carried out and a number of flood protection measures were recommended and were implemented at site. As part of this review, a safety analysis was also done to demonstrate reactor safety with a series of failures considered in the flood protection features. For each inland NPP site, as part of design, different flood scenarios are analysed to arrive at design basis flood (DBF) level. This level is estimated based on worst combination of heavy local precipitation, flooding in river, failure of upstream/downstream water control structures

  14. A Bayesian-Based System to Assess Wave-Driven Flooding Hazards on Coral Reef-Lined Coasts

    Science.gov (United States)

    Pearson, S. G.; Storlazzi, C. D.; van Dongeren, A. R.; Tissier, M. F. S.; Reniers, A. J. H. M.

    2017-12-01

    Many low-elevation, coral reef-lined, tropical coasts are vulnerable to the effects of climate change, sea level rise, and wave-induced flooding. The considerable morphological diversity of these coasts and the variability of the hydrodynamic forcing that they are exposed to make predicting wave-induced flooding a challenge. A process-based wave-resolving hydrodynamic model (XBeach Non-Hydrostatic, "XBNH") was used to create a large synthetic database for use in a "Bayesian Estimator for Wave Attack in Reef Environments" (BEWARE), relating incident hydrodynamics and coral reef geomorphology to coastal flooding hazards on reef-lined coasts. Building on previous work, BEWARE improves system understanding of reef hydrodynamics by examining the intrinsic reef and extrinsic forcing factors controlling runup and flooding on reef-lined coasts. The Bayesian estimator has high predictive skill for the XBNH model outputs that are flooding indicators, and was validated for a number of available field cases. It was found that, in order to accurately predict flooding hazards, water depth over the reef flat, incident wave conditions, and reef flat width are the most essential factors, whereas other factors such as beach slope and bed friction due to the presence or absence of corals are less important. BEWARE is a potentially powerful tool for use in early warning systems or risk assessment studies, and can be used to make projections about how wave-induced flooding on coral reef-lined coasts may change due to climate change.Plain Language SummaryLow-lying tropical coasts fronted by coral reefs are threatened by the effects of climate change, sea level rise, and flooding caused by waves. However, the reefs on these coasts differ widely in their shape, size, and physical characteristics; the wave and water level conditions affecting these coastlines also vary in space and time. These factors make it difficult to predict flooding caused by waves along coral reef-lined coasts. We

  15. Modelling income distribution impacts of water sector projects in Bangladesh.

    Science.gov (United States)

    Ahmed, C S; Jones, S

    1991-09-01

    Dynamic analysis was conducted to assess the long-term impacts of water sector projects on agricultural income distribution, and sensitivity analysis was conducted to check the robustness of the 5 assumptions in this study of income distribution and water sector projects in Bangladesh. 7 transitions are analyzed for mutually exclusive irrigation and flooding projects: Nonirrigation to 1) LLP irrigation, 2) STW irrigation, 3) DTW irrigation, 4) major gravity irrigation, and manually operated shallow tubewell irrigation (MOSTI) and Flood Control Projects (FCD) of 6) medium flooded to shallow flooded, and 7) deeply flooded to shallow flooded. 5 analytical stages are involved: 1) farm budgets are derived with and without project cropping patterns for each transition. 2) Estimates are generated for value added/hectare from each transition. 3) Assumptions are made about the number of social classes, distribution of land ownership between classes, extent of tenancy for each social class, term of tenancy contracts, and extent of hiring of labor for each social class. 4) Annual value added/hectare is distributed among social classes. 5) Using Gini coefficients and simple ratios, the distribution of income between classes is estimated for with and without transition. Assumption I is that there are 4 social classes defined by land acreage: large farmers (5 acres), medium farmers (1.5-5.0), small farmers, (.01-1.49), and landless. Assumption II is that land distribution follows the 1978 Land Occupancy Survey (LOS). Biases, if any, are indicated. Assumption III is that large farmers sharecrop out 15% of land to small farmers. Assumption IV is that landlords provide nonirrigated crop land and take 50% of the crop, and, under irrigation, provide 50% of the fertilizer, pesticide, and irrigation costs and take 50% of the crop. Assumption V is that hired and family labor is assumed to be 40% for small farmers, 60% for medium farmers, and 80% for large farmers. It is understood that

  16. Flood management of Dongting Lake after operation of Three Gorges Dam

    Directory of Open Access Journals (Sweden)

    Xi-jun Lai

    2017-10-01

    Full Text Available Full operation of the Three Gorges Dam (TGD reduces flood risk of the middle and lower parts of the Yangtze River Basin. However, Dongting Lake, which is located in the Yangtze River Basin, is still at high risk for potentially severe flooding in the future. The effects of the TGD on flood processes were investigated using a hydrodynamic model. The 1998 and 2010 flood events before and after the operation of the TGD, respectively, were analyzed. The numerical results show that the operation of the TGD changes flood processes, including the timing and magnitude of flood peaks in Dongting Lake. The TGD can effectively reduce the flood level in Dongting Lake, which is mainly caused by the flood water from the upper reach of the Yangtze River. This is not the case, however, for floods mainly induced by flood water from four main rivers in the catchment. In view of this, a comprehensive strategy for flood management in Dongting Lake is required. Non-engineering measures, such as warning systems and combined operation of the TGD and other reservoirs in the catchment, as well as traditional engineering measures, should be further improved. Meanwhile, a sustainable philosophy for flood control, including natural flood management and lake restoration, is recommended to reduce the flood risk.

  17. A Statistical Project Control Tool for Engineering Managers

    Science.gov (United States)

    Bauch, Garland T.

    2001-01-01

    This slide presentation reviews the use of a Statistical Project Control Tool (SPCT) for managing engineering projects. A literature review pointed to a definition of project success, (i.e., A project is successful when the cost, schedule, technical performance, and quality satisfy the customer.) The literature review also pointed to project success factors, and traditional project control tools, and performance measures that are detailed in the report. The essential problem is that with resources becoming more limited, and an increasing number or projects, project failure is increasing, there is a limitation of existing methods and systematic methods are required. The objective of the work is to provide a new statistical project control tool for project managers. Graphs using the SPCT method plotting results of 3 successful projects and 3 failed projects are reviewed, with success and failure being defined by the owner.

  18. Modelling the effectiveness of grass buffer strips in managing muddy floods under a changing climate

    Science.gov (United States)

    Mullan, Donal; Vandaele, Karel; Boardman, John; Meneely, John; Crossley, Laura H.

    2016-10-01

    Muddy floods occur when rainfall generates runoff on agricultural land, detaching and transporting sediment into the surrounding natural and built environment. In the Belgian Loess Belt, muddy floods occur regularly and lead to considerable economic costs associated with damage to property and infrastructure. Mitigation measures designed to manage the problem have been tested in a pilot area within Flanders and were found to be cost-effective within three years. This study assesses whether these mitigation measures will remain effective under a changing climate. To test this, the Water Erosion Prediction Project (WEPP) model was used to examine muddy flooding diagnostics (precipitation, runoff, soil loss and sediment yield) for a case study hillslope in Flanders where grass buffer strips are currently used as a mitigation measure. The model was run for present day conditions and then under 33 future site-specific climate scenarios. These future scenarios were generated from three earth system models driven by four representative concentration pathways and downscaled using quantile mapping and the weather generator CLIGEN. Results reveal that under the majority of future scenarios, muddy flooding diagnostics are projected to increase, mostly as a consequence of large scale precipitation events rather than mean changes. The magnitude of muddy flood events for a given return period is also generally projected to increase. These findings indicate that present day mitigation measures may have a reduced capacity to manage muddy flooding given the changes imposed by a warming climate with an enhanced hydrological cycle. Revisions to the design of existing mitigation measures within existing policy frameworks are considered the most effective way to account for the impacts of climate change in future mitigation planning.

  19. River flood risk in Jakarta under scenarios of future change

    Science.gov (United States)

    Budiyono, Yus; Aerts, Jeroen C. J. H.; Tollenaar, Daniel; Ward, Philip J.

    2016-03-01

    Given the increasing impacts of flooding in Jakarta, methods for assessing current and future flood risk are required. In this paper, we use the Damagescanner-Jakarta risk model to project changes in future river flood risk under scenarios of climate change, land subsidence, and land use change. Damagescanner-Jakarta is a simple flood risk model that estimates flood risk in terms of annual expected damage, based on input maps of flood hazard, exposure, and vulnerability. We estimate baseline flood risk at USD 186 million p.a. Combining all future scenarios, we simulate a median increase in risk of +180 % by 2030. The single driver with the largest contribution to that increase is land subsidence (+126 %). We simulated the impacts of climate change by combining two scenarios of sea level rise with simulations of changes in 1-day extreme precipitation totals from five global climate models (GCMs) forced by the four Representative Concentration Pathways (RCPs). The results are highly uncertain; the median change in risk due to climate change alone by 2030 is a decrease by -46 %, but we simulate an increase in risk under 12 of the 40 GCM-RCP-sea level rise combinations. Hence, we developed probabilistic risk scenarios to account for this uncertainty. If land use change by 2030 takes places according to the official Jakarta Spatial Plan 2030, risk could be reduced by 12 %. However, if land use change in the future continues at the same rate as the last 30 years, large increases in flood risk will take place. Finally, we discuss the relevance of the results for flood risk management in Jakarta.

  20. Impacts of future climate change on urban flood volumes in Hohhot in northern China: benefits of climate change mitigation and adaptations

    Science.gov (United States)

    Zhou, Qianqian; Leng, Guoyong; Huang, Maoyi

    2018-01-01

    As China becomes increasingly urbanised, flooding has become a regular occurrence in its major cities. Assessing the effects of future climate change on urban flood volumes is crucial to informing better management of such disasters given the severity of the devastating impacts of flooding (e.g. the 2016 flooding events across China). Although recent studies have investigated the impacts of future climate change on urban flooding, the effects of both climate change mitigation and adaptation have rarely been accounted for together in a consistent framework. In this study, we assess the benefits of mitigating climate change by reducing greenhouse gas (GHG) emissions and locally adapting to climate change by modifying drainage systems to reduce urban flooding under various climate change scenarios through a case study conducted in northern China. The urban drainage model - Storm Water Management Model - was used to simulate urban flood volumes using current and two adapted drainage systems (i.e. pipe enlargement and low-impact development, LID), driven by bias-corrected meteorological forcing from five general circulation models in the Coupled Model Intercomparison Project Phase 5 archive. Results indicate that urban flood volume is projected to increase by 52 % over 2020-2040 compared to the volume in 1971-2000 under the business-as-usual scenario (i.e. Representative Concentration Pathway (RCP) 8.5). The magnitudes of urban flood volumes are found to increase nonlinearly with changes in precipitation intensity. On average, the projected flood volume under RCP 2.6 is 13 % less than that under RCP 8.5, demonstrating the benefits of global-scale climate change mitigation efforts in reducing local urban flood volumes. Comparison of reduced flood volumes between climate change mitigation and local adaptation (by improving drainage systems) scenarios suggests that local adaptation is more effective than climate change mitigation in reducing future flood volumes. This has

  1. Development of Hydrological Model of Klang River Valley for flood forecasting

    Science.gov (United States)

    Mohammad, M.; Andras, B.

    2012-12-01

    This study is to review the impact of climate change and land used on flooding through the Klang River and to compare the changes in the existing river system in Klang River Basin with the Storm water Management and Road Tunnel (SMART) which is now already operating in the city centre of Kuala Lumpur. Klang River Basin is the most urbanized region in Malaysia. More than half of the basin has been urbanized on the land that is prone to flooding. Numerous flood mitigation projects and studies have been carried out to enhance the existing flood forecasting and mitigation project. The objective of this study is to develop a hydrological model for flood forecasting in Klang Basin Malaysia. Hydrological modelling generally requires large set of input data and this is more often a challenge for a developing country. Due to this limitation, the Tropical Rainfall Measuring Mission (TRMM) rainfall measurement, initiated by the US space agency NASA and Japanese space agency JAXA was used in this study. TRMM data was transformed and corrected by quantile to quantile transformation. However, transforming the data based on ground measurement doesn't make any significant improvement and the statistical comparison shows only 10% difference. The conceptual HYMOD model was used in this study and calibrated using ROPE algorithm. But, using the whole time series of the observation period in this area resulted in insufficient performance. The depth function which used in ROPE algorithm are then used to identified and calibrated using only unusual event to observed the improvement and efficiency of the model.

  2. Self-observation versus flooding in the treatment of agoraphobia

    NARCIS (Netherlands)

    Emmelkamp, Paul M.G.

    The effects on agoraphobia of (1) self-observation with a minimum of therapeutic intervention. (2) flooding, (3) a combination of flooding and self-observation, and (4) no-treatment control were compared. Assessments were made at the beginning of treatment, during and at the end of treatment and at

  3. PCDD/Fs and dioxin-like PCBs in soils after the flooding of River Elbe and Mulde in 2002

    Energy Technology Data Exchange (ETDEWEB)

    Umlauf, G.; Christoph, E.H.; Bidoglio, G. [European Commission, Ispra (IT). Institute for Environment and Sustainability (IES), Joint Research Center (JRC)

    2004-09-15

    On account of the Elbe and Mulde flooding in 2002 the UFZ Centre for Environmental Research Leipzig/Halle co-ordinated an ad hoc project entitled 'Pollutant studies following the flooding in August 2002 - determining the potential hazards in the Elbe and the Mulde' (BMBF ad-hoc- Verbundprojekt Elbe Hochwasser 2002). In the frame of this project, the Institute of Environment and Sustainability of the Joint Research Centre of the European Commission addressed the issue of the contamination of PCDD/Fs and dioxin-like PCBs in flooded soils. The objective of this survey was to assess the contamination of urban and agricultural soils in relation to current land use, to estimate the specific impact of the flooding in 2002 and to link the contamination data to possible sources.

  4. Local and regional estimation of floods in the Timis and Bega hydrographic basins: application of converging QDF model concept

    International Nuclear Information System (INIS)

    Mic, Rodica; Gaida, Gilles

    2004-01-01

    A flow-duration-frequency regionalisation is carried out on the Timis and Bega rivers sub-catchments in the west of Romania. This regionalisation concerns 28 sub-catchments having about thirty years of stream flow measurements (daily flow, instantaneous flood peaks and hydrographs). This work about the floods regionalisation is realized in the framework of the European project Riverlife. The regional model will allow defining the hydrographs of project necessary for the hydraulic modelling. This hydraulic project is necessary in order to protect Timisoara - city against the floods. The method uses the hypotheses of the converging QdF model and adapts the index flood method for obtaining a regional dimensionless distribution. For long return periods, this approach uses the GRADEX method, which extrapolates discharge distributions according to the rainfall distributions. The dimensionless regional QdF model needs two local descriptors of target site to be denormed: QIXA10 and Δ: the annual maximum instantaneous flow with a 10% probability to be exceeded (the 10-year peak flood) and a characteristic duration, respectively. For these both variables, the relations obtained by regression are presented, involving morphologic and climatic basin characteristics.(Author)

  5. Demonstrator Flood Control Room : Inventarisatie van de wensen van de verschillende Deltares onderdelen en een hierop gebaseerd ontwerp

    NARCIS (Netherlands)

    Boertjens, G.J.; Attema-van Waas, A.R.; Guikema, M.; Schilder, C.M.C.; Veen, M.J. van der

    2009-01-01

    Op basis van het uitgevoerde onderzoek trekt TNO de volgende conclusies: • De bestaande ruimte die Deltares op het oog heeft voor de realisatie van de trainingsruimte is klein. Een eerste fase van de gewenste Flood Control Room is realiseerbaar in deze ruimte, met inachtneming dat niet alle

  6. A study of Water flooding modeling for DMFC at cathode channel

    International Nuclear Information System (INIS)

    Dong, Sang Keun; Yoo, Ki Soo; Lee, Dae Keun; Chung, Myung Kyoon

    2007-01-01

    The present paper addresses the water flooding model validation in cathode channel for DMFC. Water flooding not only reduces DMFC stack performance but also causes O 2 starve that damages membrane at cathode channel. Although the water flooding problem is critical in operating DMFC, it has not been resolved yet since the effect of temperature, H 2 O vapor and liquid partial pressure effects on the H 2 O vapor saturation is very complex. Therefore, the operating feasible range in the dynamic control of DMFC is inevitably narrow. In order to be able to dynamically control the DMFC to prevent water flooding problem at cathode channel, 3D numerical model was validated by comparison with experimental result. We performed numerical simulation for a wide range of Vcell - current density for 1 layer-1 cell DMFC and the results were compared with experimental data. It was found that the 3D simulation model for the DMFC can be used to accurately predict the water flooding at cathode channel

  7. Information support systems for cultural heritage protection against flooding

    Directory of Open Access Journals (Sweden)

    K. Nedvedova

    2015-08-01

    Full Text Available The goal of this paper is to present use of different kind of software applications to create complex support system for protection of cultural heritage against flooding. The project is very complex and it tries to cover the whole area of the problem from prevention to liquidation of aftermath effects. We used GIS for mapping the risk areas, ontology systems for vulnerability assessment application and the BORM method (Business Object Relation Modelling for flood protection system planning guide. Those modern technologies helped us to gather a lot of information in one place and provide the knowledge to the broad audience.

  8. Flood of July 21, 1975 in Mercer County, New Jersey

    Science.gov (United States)

    Stankowski, Stephen J.; Schopp, Robert D.; Velnich, Anthony J.

    1975-01-01

    Intense rainfall during the evening of July 20 and early morning hours of July 21, 1975 caused flooding of unprecedented magnitude in highly urbanized Mercer County, New Jersey. Over 6 inches (152 millimetres) of rainfall was recorded during a 10-hour period at Trenton, the capital of New Jersey. No lives were lost but damages to highways and bridges, to industrial, business, and residential buildings, to farmlands and crops, and to water supply systems were severe. This report illustrates the magnitude of the flood and provides hydrologic data needed for planning and design to control or lessen damages from future floods. It includes discussions of the antecedent conditions and meteorological aspects of the storm; a description of the flood and comparison to previous floods; a summary of flood stages and discharges; a discussion of flood frequency; and photomosaics which show inundated areas. More than 200 high-water marks are described as to location and elevation above mean sea level.

  9. Case Studies of the ROZ CO2 Flood and the Combined ROZ/MPZ CO2 Flood at the Goldsmith Landreth Unit, Ector County, Texas. Using ''Next Generation'' CO2 EOR Technologies to Optimize the Residual Oil Zone CO2 Flood

    Energy Technology Data Exchange (ETDEWEB)

    Trentham, Robert C. [Univ. of Texas, Midland, TX (United States); Melzer, L. Stephen [Univ. of Texas, Midland, TX (United States); Kuuskraa, Vello [Advanced Resources International, Inc., Arlington, VA (United States); Koperna, George [Advanced Resources International, Inc., Arlington, VA (United States)

    2015-06-30

    The technology for CO2 Enhanced Oil Recovery (CO2 EOR) has significantly advanced since the earliest floods were implemented in the 1970s. At least for the Permian Basin region of the U.S., the oil recovery has been now been extended into residual oil zones (ROZs) where the mobile fluid phase is water and immobile phase is oil. But the nature of the formation and fluids within the ROZs has brought some challenges that were not present when flooding the MPZs. The Goldsmith-Landreth project in the Permian Basin was intended to first identify the most pressing issues of the ROZs floods and, secondly, begin to address them with new techniques designed to optimize a flood that commingled the MPZ and the ROZ. The early phase of the research conducted considerable reservoir and fluid characterization work and identified both technical and commercial challenges of producing the enormous quantities of water when flooding the ROZs. It also noted the differing water compositions in the ROZ as compared to the overlying MPZs. A new CO2 gas lift system using a capillary string was successfully applied during the project which conveyed the CO2 to the deeper and differing ROZ reservoir conditions at Goldsmith and added a second capillary string that facilitated applying scale inhibitors to mitigate the scaling tendencies of the mixing ROZ and MPZ formation waters. The project also undertook a reservoir modeling effort, using the acquired reservoir characterization data, to history match both the primary and water flood phases of the MPZ and to establish the initial conditions for a modeling effort to forecast response of the ROZ to CO2 EOR. With the advantage of many profile logs acquired from the operator, some concentration on the original pattern area for the ROZ pilot was accomplished to attempt to perfect the history match for that area. Several optional scenarios for producing the ROZ were simulated seeking to find the

  10. ICMPv6 RA Flooding Vulnerability Research

    Directory of Open Access Journals (Sweden)

    Linas Jočys

    2016-06-01

    Full Text Available ICMPv6 is the newest version of internet control message protocol, whose main purpose is to send error message indicating packet processing failure. It is know that ICMPv6 is technologically vulnerable. One of those vulnerabilities is the ICMPv6 RA flooding vulnerability, which can lead to systems in Local Area Network slow down or full stop. This paper will discuss Windows (XP, 7, 8.1 and Linux Ubuntu 14 operating systems resistance to RA flooding attack research and countermeasures to minimize this vulnerability.

  11. HYDRAULIC SIMULATION OF FLASH FLOOD AS TRIGGERED BY NATURAL DAM BREAK

    Directory of Open Access Journals (Sweden)

    Yanuar Tri Kurniawan

    2015-05-01

    Calibration model result showed that the height of natural dam significantly influence changes of water surface elevation at control point. Tracing of flood result in reconstruction of January 2006 flood showed the conformity with the real event. It was observed from the arrival time of flood at certain location. From obtained results, it can be concluded that simulation modeling gave the acceptable results.

  12. Floods and climate: emerging perspectives for flood risk assessment and management

    DEFF Research Database (Denmark)

    Merz, B.; Aerts, J.; Arnbjerg-Nielsen, Karsten

    2014-01-01

    context of floods. We come to the following conclusions: (1) extending the traditional system boundaries (local catchment, recent decades, hydrological/hydraulic processes) opens up exciting possibilities for better understanding and improved tools for flood risk assessment and management. (2) Statistical......, and this variation may be partially quantifiable and predictable, with the perspective of dynamic, climate-informed flood risk management. (4) Efforts are needed to fully account for factors that contribute to changes in all three risk components (hazard, exposure, vulnerability) and to better understand......Flood estimation and flood management have traditionally been the domain of hydrologists, water resources engineers and statisticians, and disciplinary approaches abound. Dominant views have been shaped; one example is the catchment perspective: floods are formed and influenced by the interaction...

  13. In the Way of Peacemaker Guide Curve between Water Supply and Flood Control for Short Term Reservoir Operation

    Science.gov (United States)

    Uysal, G.; Sensoy, A.; Yavuz, O.; Sorman, A. A.; Gezgin, T.

    2012-04-01

    Effective management of a controlled reservoir system where it involves multiple and sometimes conflicting objectives is a complex problem especially in real time operations. Yuvacık Dam Reservoir, located in the Marmara region of Turkey, is built to supply annual demand of 142 hm3 water for Kocaeli city requires such a complex management strategy since it has relatively small (51 hm3) effective capacity. On the other hand, the drainage basin is fed by both rainfall and snowmelt since the elevation ranges between 80 - 1548 m. Excessive water must be stored behind the radial gates between February and May in terms of sustainability especially for summer and autumn periods. Moreover, the downstream channel physical conditions constraint the spillway releases up to 100 m3/s although the spillway is large enough to handle major floods. Thus, this situation makes short term release decisions the challenging task. Long term water supply curves, based on historical inflows and annual water demand, are in conflict with flood regulation (control) levels, based on flood attenuation and routing curves, for this reservoir. A guide curve, that is generated using both water supply and flood control of downstream channel, generally corresponds to upper elevation of conservation pool for simulation of a reservoir. However, sometimes current operation necessitates exceeding this target elevation. Since guide curves can be developed as a function of external variables, the water potential of a basin can be an indicator to explain current conditions and decide on the further strategies. Besides, releases with respect to guide curve are managed and restricted by user-defined rules. Although the managers operate the reservoir due to several variable conditions and predictions, still the simulation model using variable guide curve is an urgent need to test alternatives quickly. To that end, using HEC-ResSim, the several variable guide curves are defined to meet the requirements by

  14. Assessing and optimising flood control options along the Arachthos river floodplain (Epirus, Greece)

    Science.gov (United States)

    Drosou, Athina; Dimitriadis, Panayiotis; Lykou, Archontia; Kossieris, Panagiotis; Tsoukalas, Ioannis; Efstratiadis, Andreas; Mamassis, Nikos

    2015-04-01

    We present a multi-criteria simulation-optimization framework for the optimal design and setting of flood protection structures along river banks. The methodology is tested in the lower course of the Arachthos River (Epirus, Greece), downstream of the hydroelectric dam of Pournari. The entire study area is very sensitive, particularly because the river crosses the urban area of Arta, which is located just after the dam. Moreover, extended agricultural areas that are crucial for the local economy are prone to floods. In the proposed methodology we investigate two conflicting criteria, i.e. the minimization of flood hazards (due to damages to urban infrastructures, crops, etc.) and the minimization of construction costs of the essential hydraulic structures (e.g. dikes). For the hydraulic simulation we examine two flood routing models, named 1D HEC-RAS and quasi-2D LISFLOOD, whereas the optimization is carried out through the Surrogate-Enhanced Evolutionary Annealing-Simplex (SE-EAS) algorithm that couples the strengths of surrogate modeling with the effectiveness and efficiency of the EAS method.

  15. Flood Control Structures Research Program. Annotated Bibliography on Grade Control Structures

    Science.gov (United States)

    1991-09-01

    evaluating the effects of geology, geomorphology, soils, land use, and climate on runoff and sediment production from major source areas; (4...Otto, and ,t:iji, Ahmed. 1987. "Theoret- ical Flow Model for Drop Structures," -’. aulic ’ngineering, Proceed- ings of the 1987 National Confere’,ce on...Facilities for Unique Flood Problems," Journal of the-Waterways and Harbors Division, ASCE, Vol 97, No. WWI, pp 185-203. The unusual climatic

  16. The 3D Elevation Program—Flood risk management

    Science.gov (United States)

    Carswell, William J.; Lukas, Vicki

    2018-01-25

    Flood-damage reduction in the United States has been a longstanding but elusive societal goal. The national strategy for reducing flood damage has shifted over recent decades from a focus on construction of flood-control dams and levee systems to a three-pronged strategy to (1) improve the design and operation of such structures, (2) provide more accurate and accessible flood forecasting, and (3) shift the Federal Emergency Management Agency (FEMA) National Flood Insurance Program to a more balanced, less costly flood-insurance paradigm. Expanding the availability and use of high-quality, three-dimensional (3D) elevation information derived from modern light detection and ranging (lidar) technologies to provide essential terrain data poses a singular opportunity to dramatically enhance the effectiveness of all three components of this strategy. Additionally, FEMA, the National Weather Service, and the U.S. Geological Survey (USGS) have developed tools and joint program activities to support the national strategy.The USGS 3D Elevation Program (3DEP) has the programmatic infrastructure to produce and provide essential terrain data. This infrastructure includes (1) data acquisition partnerships that leverage funding and reduce duplicative efforts, (2) contracts with experienced private mapping firms that ensure acquisition of consistent, low-cost 3D elevation data, and (3) the technical expertise, standards, and specifications required for consistent, edge-to-edge utility across multiple collection platforms and public access unfettered by individual database designs and limitations.High-quality elevation data, like that collected through 3DEP, are invaluable for assessing and documenting flood risk and communicating detailed information to both responders and planners alike. Multiple flood-mapping programs make use of USGS streamflow and 3DEP data. Flood insurance rate maps, flood documentation studies, and flood-inundation map libraries are products of these

  17. STUDY REGARDING DELINEATION OF FLOOD HAZARD ZONES IN THE HYDROGRAPHIC BASIN OF THE SOMEŞ RIVER, BORDER AREA

    Directory of Open Access Journals (Sweden)

    STOICA F.

    2014-03-01

    Full Text Available The hydrological studies will provide the characteristic parameters for the floods occurred for the calculus discharges with overflow probabilities of 0,1%; 1%, 5%, 10%. The hydrologic and hydraulic models will be made by using the hydro-meteorological data base and the topographical measurements on site; them calibration will be done according to the records of the historical floods. The studies on the hydrologic and hydraulic models will be necessary for the establishment of the carrying capacity of the riverbeds, for the delimitation of the flood plains and for the detection of the transit discharges at the hydro-technical installations, but also for the establishment of the parameters needed for the structural measures’ projects. These will be based on the 1D and 2D unstable hydro-dynamic models. Therefore, the users would be able to assess the proposed measures and the impact over the river’s system; of course with the potential combination of the 1D and 2D. The main objectives followed by the project are: • identification of the river basins or river sub-basins with flood risks; • regionalization of the flood hazard; • presentation of the main flash floods occurred during the last 30 years, which induced floods; • assessment of the consequences of eventual flood over the population, properties and environment; • the establishment of the protection degree, accepted for the human settlements, for the economic and social objectives, for the farm areas, etc.;

  18. Design and Implementation of a CO2 Flood Utilizing Advanced Reservoir Characterization and Horizontal Injection Wells In a Shallow Shelf Carbonate Approaching Waterflood Depletion, Class II; ANNUAL

    International Nuclear Information System (INIS)

    Czirr, K.L.; Gaddis, M.P.; Moshell, M.K.

    2002-01-01

    The principle objective of this project is to demonstrate the economic viability and widespread applicability of an innovative reservoir management and carbon dioxide (CO2) flood project development approach for improving CO2 flood project economics in shallow shelf carbonate (SSC) reservoirs

  19. Estimation of flood environmental effects using flood zone mapping techniques in Halilrood Kerman, Iran.

    Science.gov (United States)

    Boudaghpour, Siamak; Bagheri, Majid; Bagheri, Zahra

    2014-01-01

    High flood occurrences with large environmental damages have a growing trend in Iran. Dynamic movements of water during a flood cause different environmental damages in geographical areas with different characteristics such as topographic conditions. In general, environmental effects and damages caused by a flood in an area can be investigated from different points of view. The current essay is aiming at detecting environmental effects of flood occurrences in Halilrood catchment area of Kerman province in Iran using flood zone mapping techniques. The intended flood zone map was introduced in four steps. Steps 1 to 3 pave the way to calculate and estimate flood zone map in the understudy area while step 4 determines the estimation of environmental effects of flood occurrence. Based on our studies, wide range of accuracy for estimating the environmental effects of flood occurrence was introduced by using of flood zone mapping techniques. Moreover, it was identified that the existence of Jiroft dam in the study area can decrease flood zone from 260 hectares to 225 hectares and also it can decrease 20% of flood peak intensity. As a result, 14% of flood zone in the study area can be saved environmentally.

  20. Flood Risk Management in Iowa through an Integrated Flood Information System

    Science.gov (United States)

    Demir, Ibrahim; Krajewski, Witold

    2013-04-01

    The Iowa Flood Information System (IFIS) is a web-based platform developed by the Iowa Flood Center (IFC) to provide access to flood inundation maps, real-time flood conditions, flood forecasts both short-term and seasonal, flood-related data, information and interactive visualizations for communities in Iowa. The key element of the system's architecture is the notion of community. Locations of the communities, those near streams and rivers, define basin boundaries. The IFIS provides community-centric watershed and river characteristics, weather (rainfall) conditions, and streamflow data and visualization tools. Interactive interfaces allow access to inundation maps for different stage and return period values, and flooding scenarios with contributions from multiple rivers. Real-time and historical data of water levels, gauge heights, and rainfall conditions are available in the IFIS by streaming data from automated IFC bridge sensors, USGS stream gauges, NEXRAD radars, and NWS forecasts. Simple 2D and 3D interactive visualizations in the IFIS make the data more understandable to general public. Users are able to filter data sources for their communities and selected rivers. The data and information on IFIS is also accessible through web services and mobile applications. The IFIS is optimized for various browsers and screen sizes to provide access through multiple platforms including tablets and mobile devices. The IFIS includes a rainfall-runoff forecast model to provide a five-day flood risk estimate for around 1100 communities in Iowa. Multiple view modes in the IFIS accommodate different user types from general public to researchers and decision makers by providing different level of tools and details. River view mode allows users to visualize data from multiple IFC bridge sensors and USGS stream gauges to follow flooding condition along a river. The IFIS will help communities make better-informed decisions on the occurrence of floods, and will alert

  1. Carbon degradation in agricultural soils flooded with seawater after managed coastal realignment

    Science.gov (United States)

    Sjøgaard, Kamilla S.; Treusch, Alexander H.; Valdemarsen, Thomas B.

    2017-09-01

    Permanent flooding of low-lying coastal areas is a growing threat due to climate change and related sea-level rise. An increasingly common solution to protect coastal areas lying below sea level is intentional flooding by "managed coastal realignment". However, the biogeochemical implications of flooding agricultural soils with seawater are still not well understood. We conducted a 1-year mesocosm experiment to investigate microbial carbon degradation processes in soils flooded with seawater. Agricultural soils were sampled on the northern coast of the island Fyn (Denmark) at Gyldensteen Strand, an area that was subsequently flooded in a coastal realignment project. We found rapid carbon degradation to TCO2 1 day after experimental flooding and onwards and microbial sulfate reduction established quickly as an important mineralization pathway. Nevertheless, no free sulfide was observed as it precipitated as Fe-S compounds with Fe acting as a natural buffer, preventing toxic effects of free sulfide in soils flooded with seawater. Organic carbon degradation decreased significantly after 6 months, indicating that most of the soil organic carbon was refractory towards microbial degradation under the anoxic conditions created in the soil after flooding. During the experiment only 6-7 % of the initial soil organic carbon pools were degraded. On this basis we suggest that most of the organic carbon present in coastal soils exposed to flooding through sea-level rise or managed coastal realignment will be permanently preserved.

  2. Investment in flood protection measures under climate change uncertainty. An investment decision

    Energy Technology Data Exchange (ETDEWEB)

    Bruin, Karianne de

    2012-11-01

    Recent river flooding in Europe has triggered debates among scientists and policymakers on future projections of flood frequency and the need for adaptive investments, such as flood protection measures. Because there exists uncertainty about the impact of climate change of flood risk, such investments require a careful analysis of expected benefits and costs. The objective of this paper is to show how climate change uncertainty affects the decision to invest in flood protection measures. We develop a model that simulates optimal decision making in flood protection, it incorporates flexible timing of investment decisions and scientific uncertainty on the extent of climate change impacts. This model allows decision-makers to cope with the uncertain impacts of climate change on the frequency and damage of river flood events and minimises the risk of under- or over-investment. One of the innovative elements is that we explicitly distinguish between structural and non-structural flood protection measures. Our results show that the optimal investment decision today depends strongly on the cost structure of the adaptation measures and the discount rate, especially the ratio of fixed and weighted annual costs of the measures. A higher level of annual flood damage and later resolution of uncertainty in time increases the optimal investment. Furthermore, the optimal investment decision today is influenced by the possibility of the decision-maker to adjust his decision at a future moment in time.(auth)

  3. ANG coal gasification project management control system report. [Great Plains project

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    Much time, money and effort has been spent in the forefront of this project for project controls. The work breakdown structure for the systems has been custom designed. The systems, both manual and computerized, have been well scrutinized and chosen by ANG to represent the most cost effective and efficient way of controlling a project the magnitude of $1.5 billion. These systems have been developed in a manner so that information can be gathered as detailed or as summarized as necessary, and in the most timely and expeditious ways.

  4. Concurrency and climate change signal in Scottish flooding

    Science.gov (United States)

    Harding, A. E.; Butler, A.; Goody, N.; Bertram, D.; Baggaley, N.; Tett, S. F.

    2013-12-01

    The Scottish Environment Protection Agency maintains a database of river gauging stations and intensity rain-gauges with a 3-hourly resolution that covers the majority of Scotland. Both SEPA and a number of other Scottish agencies are invested in climate change attribution in this data set. SEPA's main interest lies in trend detection and changes in river level (';stage') data throughout Scotland. Emergency response teams are more concerned with the concurrency of multiple flood events that might stretch their ability to respond effectively. Unfortunately, much of the rainfall signal within SEPA's river-gauge data is altered by land use changes, modified by artificial interventions such as reservoirs, compromised by tidal flow, or obscured by measurement issues. Data reduction techniques, indices of extreme rainfall, and hydrology-driven discrimination have been employed to produce a reduced set of flood-relevant information for 24-hour ';flashy' events. Links between this set and North Atlantic circulation have been explored, as have patterns of mutual occurrence across Scotland and location- and seasonally- dependent trends through time. Both frontal systems and summer convective storms have been characterised in terms of subsequent flood-inducing flow regime, their changing behaviour over the last fifty years, and their spatial extent. This is the first stage of an ongoing project that will intelligently expand to take less robust river and rain-gauge stations into account through statistical analysis and hydrological modelling. It is also the first study of its type to analyse a nation-scale dataset of both rainfall and river flow from multiple catchments for flood event concurrency. As rainfall events are expected to intensify across much of Europe, this kind of research is likely to have an increasing degree of relevance for policy-makers. This project demonstrates that productive, policy-relevant and mutually-rewarding partnerships are already underway.

  5. Tank Waste Remediation System Projects Document Control Plan

    International Nuclear Information System (INIS)

    Slater, G.D.; Halverson, T.G.

    1994-01-01

    The purpose of this Tank Waste Remediation System Projects Document Control Plan is to provide requirements and responsibilities for document control for the Hanford Waste Vitrification Plant (HWVP) Project and the Initial Pretreatment Module (IPM) Project

  6. The probability of flooding wave occurrence and the vulnerability of the Kosovo territory settlements

    Directory of Open Access Journals (Sweden)

    Valjarević Aleksandar

    2013-01-01

    Full Text Available The work displays the presumed laws of flooding waves which would occur if the 1976 situation when the great floods in Kosovo happened reoccurred again. On a 1:300000 multilayer map of Kosovo and Metohia, there are areas which would have been flooded in case of a maximum flooding wave, and what is also shown is the areas which were covered in water as the average was measured, including the areas used as projects of minimal flooding wave value. There is a layer showing the points with regular flood defense, including the places where protection needs to establish. The map includes the ratio of 1:300000, whilst the areas are calculated with the help of processing their dynamic static’s, as well as using the formulae Gumbel Distribution and Weibull Formula. The data have been calculated with their maximum value, including the average and the minimum of flooding period embracing the time of 40 years. [Projekat Ministarstva nauke Republike Srbije, br. III44006 i br. 176019

  7. Participatory approaches to understanding practices of flood management across borders

    Science.gov (United States)

    Bracken, L. J.; Forrester, J.; Oughton, E. A.; Cinderby, S.; Donaldson, A.; Anness, L.; Passmore, D.

    2012-04-01

    The aim of this paper is to outline and present initial results from a study designed to identify principles of and practices for adaptive co-management strategies for resilience to flooding in borderlands using participatory methods. Borderlands are the complex and sometimes undefined spaces existing at the interface of different territories and draws attention towards messy connections and disconnections (Strathern 2004; Sassen 2006). For this project the borderlands concerned are those between professional and lay knowledge, between responsible agencies, and between one nation and another. Research was focused on the River Tweed catchment, located on the Scottish-English border. This catchment is subject to complex environmental designations and rural development regimes that make integrated management of the whole catchment difficult. A multi-method approach was developed using semi-structured interviews, Q methodology and participatory GIS in order to capture wide ranging practices for managing flooding, the judgements behind these practices and to 'scale up' participation in the study. Professionals and local experts were involved in the research. The methodology generated a useful set of options for flood management, with research outputs easily understood by key management organisations and the wider public alike. There was a wide endorsement of alternative flood management solutions from both managers and local experts. The role of location was particularly important for ensuring communication and data sharing between flood managers from different organisations and more wide ranging stakeholders. There were complex issues around scale; both the mismatch between communities and evidence of flooding and the mismatch between governance and scale of intervention for natural flood management. The multi-method approach was essential in capturing practice and the complexities around governance of flooding. The involvement of key flood management organisations was

  8. Development of Hydrometeorological Monitoring and Forecasting as AN Essential Component of the Early Flood Warning System:

    Science.gov (United States)

    Manukalo, V.

    2012-12-01

    Defining issue The river inundations are the most common and destructive natural hazards in Ukraine. Among non-structural flood management and protection measures a creation of the Early Flood Warning System is extremely important to be able to timely recognize dangerous situations in the flood-prone areas. Hydrometeorological information and forecasts are a core importance in this system. The primary factors affecting reliability and a lead - time of forecasts include: accuracy, speed and reliability with which real - time data are collected. The existing individual conception of monitoring and forecasting resulted in a need in reconsideration of the concept of integrated monitoring and forecasting approach - from "sensors to database and forecasters". Result presentation The Project: "Development of Flood Monitoring and Forecasting in the Ukrainian part of the Dniester River Basin" is presented. The project is developed by the Ukrainian Hydrometeorological Service in a conjunction with the Water Management Agency and the Energy Company "Ukrhydroenergo". The implementation of the Project is funded by the Ukrainian Government and the World Bank. The author is nominated as the responsible person for coordination of activity of organizations involved in the Project. The term of the Project implementation: 2012 - 2014. The principal objectives of the Project are: a) designing integrated automatic hydrometeorological measurement network (including using remote sensing technologies); b) hydrometeorological GIS database construction and coupling with electronic maps for flood risk assessment; c) interface-construction classic numerical database -GIS and with satellite images, and radar data collection; d) providing the real-time data dissemination from observation points to forecasting centers; e) developing hydrometeoroogical forecasting methods; f) providing a flood hazards risk assessment for different temporal and spatial scales; g) providing a dissemination of

  9. A dimension reduction method for flood compensation operation of multi-reservoir system

    Science.gov (United States)

    Jia, B.; Wu, S.; Fan, Z.

    2017-12-01

    Multiple reservoirs cooperation compensation operations coping with uncontrolled flood play vital role in real-time flood mitigation. This paper come up with a reservoir flood compensation operation index (ResFCOI), which formed by elements of flood control storage, flood inflow volume, flood transmission time and cooperation operations period, then establish a flood cooperation compensation operations model of multi-reservoir system, according to the ResFCOI to determine a computational order of each reservoir, and lastly the differential evolution algorithm is implemented for computing single reservoir flood compensation optimization in turn, so that a dimension reduction method is formed to reduce computational complexity. Shiguan River Basin with two large reservoirs and an extensive uncontrolled flood area, is used as a case study, results show that (a) reservoirs' flood discharges and the uncontrolled flood are superimposed at Jiangjiaji Station, while the formed flood peak flow is as small as possible; (b) cooperation compensation operations slightly increase in usage of flood storage capacity in reservoirs, when comparing to rule-based operations; (c) it takes 50 seconds in average when computing a cooperation compensation operations scheme. The dimension reduction method to guide flood compensation operations of multi-reservoir system, can make each reservoir adjust its flood discharge strategy dynamically according to the uncontrolled flood magnitude and pattern, so as to mitigate the downstream flood disaster.

  10. Establishment and Practical Application of Flood Warning Stage in Taiwan's River

    Science.gov (United States)

    Yang, Sheng-Hsueh; Chia Yeh, Keh-

    2017-04-01

    In the face of extreme flood events or the possible impact of climate change, non-engineering disaster prevention and early warning work is particularly important. Taiwan is an island topography with more than 3,900 meters of high mountains. The length of the river is less than 100 kilometers. Most of the watershed catchment time is less than 24 hours, which belongs to the river with steep slope and rapid flood. Every year in summer and autumn, several typhoon events invade Taiwan. Typhoons often result in rainfall events in excess of 100 mm/hr or 250 mm/3hr. In the face of Taiwan's terrain and extreme rainfall events, flooding is difficult to avoid. Therefore, most of the river has embankment protection, so that people do not have to face every year flooding caused by economic and life and property losses. However, the river embankment protection is limited. With the increase of the hydrological data, the design criteria for the embankment protection standards in the past was 100 year of flood return period and is now gradually reduced to 25 or 50 year of flood return period. The river authorities are not easy to rise the existing embankment height. The safety of the river embankment in Taiwan is determined by the establishment of the flood warning stage to cope with the possible increase in annual floods and the impact of extreme hydrological events. The flood warning stage is equal to the flood control elevation minus the flood rise rate multiply by the flood early warning time. The control elevation can be the top of the embankment, the design flood level of the river, the embankment gap of the river section, the height of the bridge beam bottom, etc. The flood rise rate is consider the factors such as hydrological stochastic and uncertain rainfall and the effect of flood discharge operation on the flood in the watershed catchment area. The maximum value of the water level difference between the two hours or five hours before the peak value of the analysis

  11. Integration of Grid and Sensor Web for Flood Monitoring and Risk Assessment from Heterogeneous Data

    Science.gov (United States)

    Kussul, Nataliia; Skakun, Sergii; Shelestov, Andrii

    2013-04-01

    Over last decades we have witnessed the upward global trend in natural disaster occurrence. Hydrological and meteorological disasters such as floods are the main contributors to this pattern. In recent years flood management has shifted from protection against floods to managing the risks of floods (the European Flood risk directive). In order to enable operational flood monitoring and assessment of flood risk, it is required to provide an infrastructure with standardized interfaces and services. Grid and Sensor Web can meet these requirements. In this paper we present a general approach to flood monitoring and risk assessment based on heterogeneous geospatial data acquired from multiple sources. To enable operational flood risk assessment integration of Grid and Sensor Web approaches is proposed [1]. Grid represents a distributed environment that integrates heterogeneous computing and storage resources administrated by multiple organizations. SensorWeb is an emerging paradigm for integrating heterogeneous satellite and in situ sensors and data systems into a common informational infrastructure that produces products on demand. The basic Sensor Web functionality includes sensor discovery, triggering events by observed or predicted conditions, remote data access and processing capabilities to generate and deliver data products. Sensor Web is governed by the set of standards, called Sensor Web Enablement (SWE), developed by the Open Geospatial Consortium (OGC). Different practical issues regarding integration of Sensor Web with Grids are discussed in the study. We show how the Sensor Web can benefit from using Grids and vice versa. For example, Sensor Web services such as SOS, SPS and SAS can benefit from the integration with the Grid platform like Globus Toolkit. The proposed approach is implemented within the Sensor Web framework for flood monitoring and risk assessment, and a case-study of exploiting this framework, namely the Namibia SensorWeb Pilot Project, is

  12. Lidar-based mapping of flood control levees in south Louisiana

    Science.gov (United States)

    Thatcher, Cindy A.; Lim, Samsung; Palaseanu-Lovejoy, Monica; Danielson, Jeffrey J.; Kimbrow, Dustin R.

    2016-01-01

    Flood protection in south Louisiana is largely dependent on earthen levees, and in the aftermath of Hurricane Katrina the state’s levee system has received intense scrutiny. Accurate elevation data along the levees are critical to local levee district managers responsible for monitoring and maintaining the extensive system of non-federal levees in coastal Louisiana. In 2012, high resolution airborne lidar data were acquired over levees in Lafourche Parish, Louisiana, and a mobile terrestrial lidar survey was conducted for selected levee segments using a terrestrial lidar scanner mounted on a truck. The mobile terrestrial lidar data were collected to test the feasibility of using this relatively new technology to map flood control levees and to compare the accuracy of the terrestrial and airborne lidar. Metrics assessing levee geometry derived from the two lidar surveys are also presented as an efficient, comprehensive method to quantify levee height and stability. The vertical root mean square error values of the terrestrial lidar and airborne lidar digital-derived digital terrain models were 0.038 m and 0.055 m, respectively. The comparison of levee metrics derived from the airborne and terrestrial lidar-based digital terrain models showed that both types of lidar yielded similar results, indicating that either or both surveying techniques could be used to monitor geomorphic change over time. Because airborne lidar is costly, many parts of the USA and other countries have never been mapped with airborne lidar, and repeat surveys are often not available for change detection studies. Terrestrial lidar provides a practical option for conducting repeat surveys of levees and other terrain features that cover a relatively small area, such as eroding cliffs or stream banks, and dunes.

  13. A Global Geospatial Database of 5000+ Historic Flood Event Extents

    Science.gov (United States)

    Tellman, B.; Sullivan, J.; Doyle, C.; Kettner, A.; Brakenridge, G. R.; Erickson, T.; Slayback, D. A.

    2017-12-01

    A key dataset that is missing for global flood model validation and understanding historic spatial flood vulnerability is a global historical geo-database of flood event extents. Decades of earth observing satellites and cloud computing now make it possible to not only detect floods in near real time, but to run these water detection algorithms back in time to capture the spatial extent of large numbers of specific events. This talk will show results from the largest global historical flood database developed to date. We use the Dartmouth Flood Observatory flood catalogue to map over 5000 floods (from 1985-2017) using MODIS, Landsat, and Sentinel-1 Satellites. All events are available for public download via the Earth Engine Catalogue and via a website that allows the user to query floods by area or date, assess population exposure trends over time, and download flood extents in geospatial format.In this talk, we will highlight major trends in global flood exposure per continent, land use type, and eco-region. We will also make suggestions how to use this dataset in conjunction with other global sets to i) validate global flood models, ii) assess the potential role of climatic change in flood exposure iii) understand how urbanization and other land change processes may influence spatial flood exposure iv) assess how innovative flood interventions (e.g. wetland restoration) influence flood patterns v) control for event magnitude to assess the role of social vulnerability and damage assessment vi) aid in rapid probabilistic risk assessment to enable microinsurance markets. Authors on this paper are already using the database for the later three applications and will show examples of wetland intervention analysis in Argentina, social vulnerability analysis in the USA, and micro insurance in India.

  14. Temperature profiles from mechanical bathythermograph (MBT) casts from the USS ENHANCE in the Philippine Sea in support of the Fleet Observations of Oceanographic Data (FLOOD) project on 1965-11-01 (NODC Accession 6500176)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — MBT data were collected from the USS ENHANCE in support of the Fleet Observations of Oceanographic Data (FLOOD) project. Data were collected in the in the Philippine...

  15. Temperature profiles from mechanical bathythermograph (MBT) casts from the USS BOLD in the Mediterranean Sea in support of the Fleet Observations of Oceanographic Data (FLOOD) project for 1955-08-25 (NODC Accession 5500036)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — MBT data were collected from the USS BOLD in support of the Fleet Observations of Oceanographic Data (FLOOD) project. Data were collected by US Navy; Ships of...

  16. Flash flood modeling with the MARINE hydrological distributed model

    Science.gov (United States)

    Estupina-Borrell, V.; Dartus, D.; Ababou, R.

    2006-11-01

    téo France); and (iii) the spatially distributed soil and other surface properties viewed from space (land cover map from SPOT or LANDSAT, main rivers, ...). The stream flood propagation model simulates flood propagation in main rivers by solving 1-D Saint Venant equations. The data required for this part of the model are the river morphology, topography and roughness. The MARINE model has already been used previously for real time flash floods forecasting in the frame of the PACTES project on "forecasting and anticipation of floods with spatial techniques'' (funded by the CNES and the French Ministry of Research) concerning the catastrophic 1999 flash flood that occurred in the South of France. The main advantages of MARINE are its ability to run on insufficiently gauged basins (with the help of satellite information) and to run in an operational mode for real-time flood forecasting.

  17. Extreme weather: Subtropical floods and tropical cyclones

    Science.gov (United States)

    Shaevitz, Daniel A.

    Extreme weather events have a large effect on society. As such, it is important to understand these events and to project how they may change in a future, warmer climate. The aim of this thesis is to develop a deeper understanding of two types of extreme weather events: subtropical floods and tropical cyclones (TCs). In the subtropics, the latitude is high enough that quasi-geostrophic dynamics are at least qualitatively relevant, while low enough that moisture may be abundant and convection strong. Extratropical extreme precipitation events are usually associated with large-scale flow disturbances, strong ascent, and large latent heat release. In the first part of this thesis, I examine the possible triggering of convection by the large-scale dynamics and investigate the coupling between the two. Specifically two examples of extreme precipitation events in the subtropics are analyzed, the 2010 and 2014 floods of India and Pakistan and the 2015 flood of Texas and Oklahoma. I invert the quasi-geostrophic omega equation to decompose the large-scale vertical motion profile to components due to synoptic forcing and diabatic heating. Additionally, I present model results from within the Column Quasi-Geostrophic framework. A single column model and cloud-revolving model are forced with the large-scale forcings (other than large-scale vertical motion) computed from the quasi-geostrophic omega equation with input data from a reanalysis data set, and the large-scale vertical motion is diagnosed interactively with the simulated convection. It is found that convection was triggered primarily by mechanically forced orographic ascent over the Himalayas during the India/Pakistan flood and by upper-level Potential Vorticity disturbances during the Texas/Oklahoma flood. Furthermore, a climate attribution analysis was conducted for the Texas/Oklahoma flood and it is found that anthropogenic climate change was responsible for a small amount of rainfall during the event but the

  18. An empirical assessment of which inland floods can be managed.

    Science.gov (United States)

    Mogollón, Beatriz; Frimpong, Emmanuel A; Hoegh, Andrew B; Angermeier, Paul L

    2016-02-01

    Riverine flooding is a significant global issue. Although it is well documented that the influence of landscape structure on floods decreases as flood size increases, studies that define a threshold flood-return period, above which landscape features such as topography, land cover and impoundments can curtail floods, are lacking. Further, the relative influences of natural versus built features on floods is poorly understood. Assumptions about the types of floods that can be managed have considerable implications for the cost-effectiveness of decisions to invest in transforming land cover (e.g., reforestation) and in constructing structures (e.g., storm-water ponds) to control floods. This study defines parameters of floods for which changes in landscape structure can have an impact. We compare nine flood-return periods across 31 watersheds with widely varying topography and land cover in the southeastern United States, using long-term hydrologic records (≥20 years). We also assess the effects of built flow-regulating features (best management practices and artificial water bodies) on selected flood metrics across urban watersheds. We show that landscape features affect magnitude and duration of only those floods with return periods ≤10 years, which suggests that larger floods cannot be managed effectively by manipulating landscape structure. Overall, urban watersheds exhibited larger (270 m(3)/s) but quicker (0.41 days) floods than non-urban watersheds (50 m(3)/s and 1.5 days). However, urban watersheds with more flow-regulating features had lower flood magnitudes (154 m(3)/s), but similar flood durations (0.55 days), compared to urban watersheds with fewer flow-regulating features (360 m(3)/s and 0.23 days). Our analysis provides insight into the magnitude, duration and count of floods that can be curtailed by landscape structure and its management. Our findings are relevant to other areas with similar climate, topography, and land use, and can help

  19. An empirical assessment of which inland floods can be managed

    Science.gov (United States)

    Mogollón, Beatriz; Frimpong, Emmanuel A.; Hoegh, Andrew B.; Angermeier, Paul

    2016-01-01

    Riverine flooding is a significant global issue. Although it is well documented that the influence of landscape structure on floods decreases as flood size increases, studies that define a threshold flood-return period, above which landscape features such as topography, land cover and impoundments can curtail floods, are lacking. Further, the relative influences of natural versus built features on floods is poorly understood. Assumptions about the types of floods that can be managed have considerable implications for the cost-effectiveness of decisions to invest in transforming land cover (e.g., reforestation) and in constructing structures (e.g., storm-water ponds) to control floods. This study defines parameters of floods for which changes in landscape structure can have an impact. We compare nine flood-return periods across 31 watersheds with widely varying topography and land cover in the southeastern United States, using long-term hydrologic records (≥20 years). We also assess the effects of built flow-regulating features (best management practices and artificial water bodies) on selected flood metrics across urban watersheds. We show that landscape features affect magnitude and duration of only those floods with return periods ≤10 years, which suggests that larger floods cannot be managed effectively by manipulating landscape structure. Overall, urban watersheds exhibited larger (270 m3/s) but quicker (0.41 days) floods than non-urban watersheds (50 m3/s and 1.5 days). However, urban watersheds with more flow-regulating features had lower flood magnitudes (154 m3/s), but similar flood durations (0.55 days), compared to urban watersheds with fewer flow-regulating features (360 m3/s and 0.23 days). Our analysis provides insight into the magnitude, duration and count of floods that can be curtailed by landscape structure and its management. Our findings are relevant to other areas with similar climate, topography, and land use, and can help ensure that

  20. The influence of climate change on flood risks in France ­- first estimates and uncertainty analysis

    OpenAIRE

    Dumas , Patrice; Hallegatte , Sréphane; Quintana-Seguí , Pere; Martin , Eric

    2013-01-01

    International audience; Abstract. This paper proposes a methodology to project the possible evolution of river flood damages due to climate change, and applies it to mainland France. Its main contributions are (i) to demonstrate a methodology to investigate the full causal chain from global climate change to local economic flood losses; (ii) to show that future flood losses may change in a very significant manner over France; (iii) to show that a very large uncertainty arises from the climate...