WorldWideScience

Sample records for flexible test station

  1. Free-Suspension Residual Flexibility Testing of Space Station Pathfinder: Comparison to Fixed-Base Results

    Science.gov (United States)

    Tinker, Michael L.

    1998-01-01

    Application of the free-suspension residual flexibility modal test method to the International Space Station Pathfinder structure is described. The Pathfinder, a large structure of the general size and weight of Space Station module elements, was also tested in a large fixed-base fixture to simulate Shuttle Orbiter payload constraints. After correlation of the Pathfinder finite element model to residual flexibility test data, the model was coupled to a fixture model, and constrained modes and frequencies were compared to fixed-base test. modes. The residual flexibility model compared very favorably to results of the fixed-base test. This is the first known direct comparison of free-suspension residual flexibility and fixed-base test results for a large structure. The model correlation approach used by the author for residual flexibility data is presented. Frequency response functions (FRF) for the regions of the structure that interface with the environment (a test fixture or another structure) are shown to be the primary tools for model correlation that distinguish or characterize the residual flexibility approach. A number of critical issues related to use of the structure interface FRF for correlating the model are then identified and discussed, including (1) the requirement of prominent stiffness lines, (2) overcoming problems with measurement noise which makes the antiresonances or minima in the functions difficult to identify, and (3) the use of interface stiffness and lumped mass perturbations to bring the analytical responses into agreement with test data. It is shown that good comparison of analytical-to-experimental FRF is the key to obtaining good agreement of the residual flexibility values.

  2. Materials Test Station

    Data.gov (United States)

    Federal Laboratory Consortium — When completed, the Materials Test Station at the Los Alamos Neutron Science Center will meet mission need. MTS will provide the only fast-reactor-like irradiation...

  3. Flexible Software Design for Korean WA-DGNSS Reference Station

    Directory of Open Access Journals (Sweden)

    Wan Sik Choi

    2013-03-01

    Full Text Available In this paper, we describe the software design results of WA-DGNSS reference station that will be constructed in Korea in the near future. Software design of the WRS (Wide area Reference Station is carried out by applying object oriented software methodology in order to provide flexibilities: easy of model change (namely ionospheric delay model etc and system addition (Galileo, GLONASS in addition to GPS etc. Software design results include the use case diagrams for the functions to be executed, the architecture diagram showing components and their relationships, the activity diagrams of behaviors and models among them, and class diagrams describing the attribute and operation.

  4. Testing EDM of Total Stations

    Directory of Open Access Journals (Sweden)

    Cirbus Ján

    2001-03-01

    Full Text Available The paper is devoted to testing electrooptical distance measuring devices (EDM built in total stations, than can be used for various tasks in the contemporary geodetic works. A rich market offer and availability of these universal measuring systems with satisfying distance range, excellent accuracy and other parameters, make total stations as dominant terrestrial geodetic instruments.For succesfully applying these instruments, above all for relliable distance measurements, the stability of the modulation frequency is the most important pre-condition. In the article, therefore, there are given some methods to verify the modulation frequency stability. In addition, some ways for determining the EDM distance constant and periodical corrections of the phase measuring unit are introduced for 4 types of EDM : LEICA 1700L, TOPCON GTS6A, TOPCON GTS2, C.ZEISS ELTA50. It were also investigated their possibilities for precise distance survey. Values of the determined constants and periodical corrections are presented in Tab. 2.Based on the investigation results of the 4 EDM types and using the values m obtained for different distances S, equations of the a posteriori standard deviations in form : m = (a+b.S were derived too.

  5. MPLM On-Orbit Interface Dynamic Flexibility Modal Test

    Science.gov (United States)

    Bookout, Paul S.; Rodriguez, Pedro I.; Tinson, Ian; Fleming, Paolo

    2001-01-01

    Now that the International Space Station (ISS) is being constructed, payload developers have to not only verify the Shuttle-to-payload interface, but also the interfaces their payload will have with the ISS. The Multi Purpose Logistic Module (MPLM) being designed and built by Alenia Spazio in Torino, Italy is one such payload. The MPLM is the primary carrier for the ISS Payload Racks, Re-supply Stowage Racks, and the Resupply Stowage Platforms to re-supply the ISS with food, water, experiments, maintenance equipment and etc. During the development of the MPLM there was no requirement for verification of the on-orbit interfaces with the ISS. When this oversight was discovered, all the dynamic test stands had already been disassembled. A method was needed that would not require an extensive testing stand and could be completed in a short amount of time. The residual flexibility testing technique was chosen. The residual flexibility modal testing method consists of measuring the free-free natural frequencies and mode shapes along with the interface frequency response functions (FRF's). Analytically, the residual flexibility method has been investigated in detail by, MacNeal, Martinez, Carne, and Miller, and Rubin, but has not been implemented extensively for model correlation due to difficulties in data acquisition. In recent years improvement of data acquisition equipment has made possible the implementation of the residual flexibility method as in Admire, Tinker, and Ivey, and Klosterman and Lemon. The residual flexibility modal testing technique is applicable to a structure with distinct points (DOF) of contact with its environment, such as the MPLM-to-Station interface through the Common Berthing Mechanism (CBM). The CBM is bolted to a flange on the forward cone of the MPLM. During the fixed base test (to verify Shuttle interfaces) some data was gathered on the forward cone panels. Even though there was some data on the forward cones, an additional modal test was

  6. Goal driven kinematic simulation of flexible arm robot for space station missions

    Science.gov (United States)

    Janssen, P.; Choudry, A.

    1987-01-01

    Flexible arms offer a great degree of flexibility in maneuvering in the space environment. The problem of transporting an astronaut for extra-vehicular activity using a space station based flexible arm robot was studied. Inverse kinematic solutions of the multilink structure were developed. The technique is goal driven and can support decision making for configuration selection as required for stability and obstacle avoidance. Details of this technique and results are given.

  7. Automation for a base station stability testing

    OpenAIRE

    Punnek, Elvis

    2016-01-01

    This Batchelor’s thesis was commissioned by Oy LM Ericsson Ab Oulu. The aim of it was to help to investigate and create a test automation solution for the stability testing of the LTE base station. The main objective was to create a test automation for a predefined test set. This test automation solution had to be created for specific environments and equipment. This work included creating the automation for the test cases and putting them to daily test automation jobs. The key factor...

  8. Fuel Cell Stations Automate Processes, Catalyst Testing

    Science.gov (United States)

    2010-01-01

    Glenn Research Center looks for ways to improve fuel cells, which are an important source of power for space missions, as well as the equipment used to test fuel cells. With Small Business Innovation Research (SBIR) awards from Glenn, Lynntech Inc., of College Station, Texas, addressed a major limitation of fuel cell testing equipment. Five years later, the company obtained a patent and provided the equipment to the commercial world. Now offered through TesSol Inc., of Battle Ground, Washington, the technology is used for fuel cell work, catalyst testing, sensor testing, gas blending, and other applications. It can be found at universities, national laboratories, and businesses around the world.

  9. A probe station for testing silicon sensors

    CERN Multimedia

    Ulysse, Fichet

    2017-01-01

    A probe station for testing silicon sensors. The probe station is located inside a dark box that can keep away light during the measurement. The set-up is located in the DSF (Department Silicon Facility). The golden plate is the "chuck" where the sensor is usually placed on. With the help of "manipulators", thin needles can be precisely positioned that can contact the sensor surface. Using these needles and the golden chuck, a high voltage can be applied to the sensor to test its behaviour under high voltage. We will use the silicon sensors that we test here for building prototypes of a highly granular sandwich calorimeter, the CMS HGC (Highly granular Calorimeter) upgrade for High-Luminosity LHC.

  10. Qualification test for the flexible receiver

    International Nuclear Information System (INIS)

    Keller, C.M.

    1994-01-01

    This document provides the test plan and procedures to certify and design verify the 42 inch and 4--6 inch Flexible Receiver (FR) is a safety class 3 system. Verification of the design will be handled in two parts. The first part will be to show that it meets design requirements set forth by documents and the second part will perform test(s) to verify its operational aspects. To qualify the design of the FR systems for field use this test will demonstrate environmentally safe removal of a Tank Farm pump mock-up from a Tank Farm riser mock-up. Testing will also demonstrate the performance of supporting equipment. The FR and the Secondary Bagging (SB) equipment shall be tested to verify successful operation of the equipment to the following criteria: The FR can be placed on a riser and connections made to the supporting equipment; The FR bag can accept equipment and be successfully sealed; The SB system encases the seal of the primary FR bag; The flexible bag(s) do not tear and maintain integrity during the entire test; The FR control system operates in the fail safe forced sequence mode; The FR control system will operate in the manual override mode (out of sequence operations); The CCTV Video system monitors and records the removal of the test item; The spray wash system operates without leaks and effectively provides coverage; The item being removed can be reinserted to a depth of 8 feet and the bag reinstalled onto the vertical bag supports; and The system prohibits momentary mechanical fluctuations due to the application of system power, including power interruptions

  11. Weigh Station and Grid Plate Testing

    International Nuclear Information System (INIS)

    PAJUNEN, A.L.

    2000-01-01

    The purpose of this test is to verify that the Shortened Fuel Canister Hook with Certified Scale (i.e. Weigh Station) can be used to weigh an empty canister from the Canister Well and the empty Primary Cleaning Machine (PCM) Strainer Basket from the process table. Drawing H-1-84835, ''Canister Handling Hook for Fuel Retrieval System Process Table,'' provides details of the Shortened Fuel Canister Hook. It is also necessary to verify that the grid plate can be lifted and tilted over a canister in the canister well. This testing shall be performed before N Reactor fuel is processed through the FRS in Phase 3. The Phase 3 Test will repeatedly weigh fuel and scrap canisters and the PCM strainer basket containing N Reactor fuel (Pajunen, et. al, 2000). Advance testing of this weigh station will ensure that accurate fuel weight data can be recorded in the Phase 3 Test. This document satisfies the requirements EN-6-031-00, ''Testing Process'' for a test plan, test specification and test procedure

  12. High temperature and pressure electrochemical test station

    DEFF Research Database (Denmark)

    Chatzichristodoulou, Christodoulos; Allebrod, Frank; Mogensen, Mogens Bjerg

    2013-01-01

    An electrochemical test station capable of operating at pressures up to 100 bars and temperatures up to 400 ◦C has been established. It enables control of the partial pressures and mass flow of O2, N2, H2, CO2, and H2O in a single or dual environment arrangement, measurements with highly corrosive...... media, as well as localized sampling of gas evolved at the electrodes for gas analysis. A number of safety and engineering design challenges have been addressed. Furthermore, we present a series of electrochemical cell holders that have been constructed in order to accommodate different types of cells...... and facilitate different types of electrochemical measurements. Selected examples of materials and electrochemical cells examined in the test station are provided, ranging from the evaluation of the ionic conductivity of liquid electrolytic solutions immobilized in mesoporous ceramic structures...

  13. System Studies for the ADTF: Target and Materials Test Station

    International Nuclear Information System (INIS)

    Cappiello, M.; Pitcher, E.; Pasamehmetoglu, K.

    2002-01-01

    To meet the objectives of the Advanced Accelerator Applications (AAA) program, the Accelerator-Driven Test Facility (ADTF) provides a world-class accelerator-driven test facility to: - Provide the capability to assess technology options for the transmutation of spent nuclear fuel and waste through a proof-of-performance. - Provide a user facility that allows testing of advanced nuclear technologies and applications, material science and research, experimental physics, and conventional nuclear engineering science applications. - Provide the capability, through upgrades or additions to the ADTF accelerator, to produce tritium for defense purposes, if required. - Provide the capability, through upgrades or additions, to produce radioisotopes for medical and commercial purposes. These missions are diverse and demand a facility with significant flexibility. In order to meet them, it is envisioned that we construct two target stations: the Target and Materials Test (TMT) station and the Subcritical Multiplier (SCM) test station. The two test stations share common hot-cell facilities for post-irradiation examination. It is expected the TMT will come online first, closely followed by the SCM. The TMT will provide the capability to: - Irradiate small samples of proposed ATW (accelerator-driven transmutation of waste) fuels and materials at prototypic flux, temperature, and coolant conditions (requires intense source of neutrons). - Perform transient testing. - Test liquid (lead-bismuth) and solid spallation targets with water, sodium, or helium coolant. - Test generation-IV fuels for advance nuclear systems (requires high-intensity thermal flux). - Irradiate fission product transmutation targets. - Test advanced fuel and coolant combinations, including helium, water, sodium, and lead-bismuth. - Produce isotopes for commercial and medical applications. - Perform neutron physics experiments. The SCM will provide the capability to: - Irradiate large samples of proposed ATW

  14. Severe Accident Test Station Design Document

    Energy Technology Data Exchange (ETDEWEB)

    Snead, Mary A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Yan, Yong [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Howell, Michael [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Keiser, James R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Terrani, Kurt A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-09-01

    The purpose of the ORNL severe accident test station (SATS) is to provide a platform for evaluation of advanced fuels under projected beyond design basis accident (BDBA) conditions. The SATS delivers the capability to map the behavior of advanced fuels concepts under accident scenarios across various temperature and pressure profiles, steam and steam-hydrogen gas mixtures, and thermal shock. The overall facility will include parallel capabilities for examination of fuels and irradiated materials (in-cell) and non-irradiated materials (out-of-cell) at BDBA conditions as well as design basis accident (DBA) or loss of coolant accident (LOCA) conditions. Also, a supporting analytical infrastructure to provide the data-needs for the fuel-modeling components of the Fuel Cycle Research and Development (FCRD) program will be put in place in a parallel manner. This design report contains the information for the first, second and third phases of design and construction of the SATS. The first phase consisted of the design and construction of an out-of-cell BDBA module intended for examination of non-irradiated materials. The second phase of this work was to construct the BDBA in-cell module to test irradiated fuels and materials as well as the module for DBA (i.e. LOCA) testing out-of-cell, The third phase was to build the in-cell DBA module. The details of the design constraints and requirements for the in-cell facility have been closely captured during the deployment of the out-of-cell SATS modules to ensure effective future implementation of the in-cell modules.

  15. Severe Accident Test Station Design Document

    International Nuclear Information System (INIS)

    Snead, Mary A.; Yan, Yong; Howell, Michael; Keiser, James R.; Terrani, Kurt A.

    2015-01-01

    The purpose of the ORNL severe accident test station (SATS) is to provide a platform for evaluation of advanced fuels under projected beyond design basis accident (BDBA) conditions. The SATS delivers the capability to map the behavior of advanced fuels concepts under accident scenarios across various temperature and pressure profiles, steam and steam-hydrogen gas mixtures, and thermal shock. The overall facility will include parallel capabilities for examination of fuels and irradiated materials (in-cell) and non-irradiated materials (out-of-cell) at BDBA conditions as well as design basis accident (DBA) or loss of coolant accident (LOCA) conditions. Also, a supporting analytical infrastructure to provide the data-needs for the fuel-modeling components of the Fuel Cycle Research and Development (FCRD) program will be put in place in a parallel manner. This design report contains the information for the first, second and third phases of design and construction of the SATS. The first phase consisted of the design and construction of an out-of-cell BDBA module intended for examination of non-irradiated materials. The second phase of this work was to construct the BDBA in-cell module to test irradiated fuels and materials as well as the module for DBA (i.e. LOCA) testing out-of-cell, The third phase was to build the in-cell DBA module. The details of the design constraints and requirements for the in-cell facility have been closely captured during the deployment of the out-of-cell SATS modules to ensure effective future implementation of the in-cell modules.

  16. Reload Startup Physics Tests for Tianwan Nuclear Power station

    International Nuclear Information System (INIS)

    Yang Xiaoqiang; Li Wenshuang; Li Youyi; Yao Jinguo; Li Zaipeng Jiangsu

    2010-01-01

    This paper briefly describes the test purposes, test items, test schedules and test equipment's for reload startup physics test's on Unit 1 and 2 of Tianwan Nuclear Power station. Then, an overview of the previous thrice tests and evaluations on the tests results are presented. In the end, the paper shows the development and work direction of optimization project for reload startup physics tests on Unit 1 and 2 of Tianwan Nuclear Power station. (Authors)

  17. Severe Accident Test Station Activity Report

    Energy Technology Data Exchange (ETDEWEB)

    Pint, Bruce A [ORNL; Terrani, Kurt A [ORNL

    2015-06-01

    Enhancing safety margins in light water reactor (LWR) severe accidents is currently the focus of a number of international R&D programs. The current UO2/Zr-based alloy fuel system is particularly susceptible since the Zr-based cladding experiences rapid oxidation kinetics in steam at elevated temperatures. Therefore, alternative cladding materials that offer slower oxidation kinetics and a smaller enthalpy of oxidation can significantly reduce the rate of heat and hydrogen generation in the core during a coolant-limited severe accident. In the U.S. program, the high temperature steam oxidation performance of accident tolerant fuel (ATF) cladding solutions has been evaluated in the Severe Accident Test Station (SATS) at Oak Ridge National Laboratory (ORNL) since 2012. This report summarizes the capabilities of the SATS and provides an overview of the oxidation kinetics of several candidate cladding materials. A suggested baseline for evaluating ATF candidates is a two order of magnitude reduction in the steam oxidation resistance above 1000ºC compared to Zr-based alloys. The ATF candidates are categorized based on the protective external oxide or scale that forms during exposure to steam at high temperature: chromia, alumina, and silica. Comparisons are made to literature and SATS data for Zr-based alloys and other less-protective materials.

  18. Optimal Coordinated Management of a Plug-In Electric Vehicle Charging Station under a Flexible Penalty Contract for Voltage Security

    Directory of Open Access Journals (Sweden)

    Jip Kim

    2016-07-01

    Full Text Available The increasing penetration of plug-in electric vehicles (PEVs may cause a low-voltage problem in the distribution network. In particular, the introduction of charging stations where multiple PEVs are simultaneously charged at the same bus can aggravate the low-voltage problem. Unlike a distribution network operator (DNO who has the overall responsibility for stable and reliable network operation, a charging station operator (CSO may schedule PEV charging without consideration for the resulting severe voltage drop. Therefore, there is a need for the DNO to impose a coordination measure to induce the CSO to adjust its charging schedule to help mitigate the voltage problem. Although the current time-of-use (TOU tariff is an indirect coordination measure that can motivate the CSO to shift its charging demand to off-peak time by imposing a high rate at the peak time, it is limited by its rigidity in that the network voltage condition cannot be flexibly reflected in the tariff. Therefore, a flexible penalty contract (FPC for voltage security to be used as a direct coordination measure is proposed. In addition, the optimal coordinated management is formulated. Using the Pacific Gas and Electric Company (PG&E 69-bus test distribution network, the effectiveness of the coordination was verified by comparison with the current TOU tariff.

  19. Qualification test for the Flexible Receiver. Revision 1

    International Nuclear Information System (INIS)

    Keller, C.M.

    1994-01-01

    This document provides the test plan and procedures to certify and design verify the 42 in. and 4 in. -- 6 in. Flexible Receiver as a safety class 3 system. The Flexible Receiver will be used by projects W-151 and W-320 for removing equipment from tanks C-106 and Az-101

  20. Qualification test for the flexible receiver. Revision 2

    International Nuclear Information System (INIS)

    Tedeschi, D.J.

    1994-01-01

    This document provides the test plan and procedures to certify and design verify the 42 double-prime and 4 double-prime-6 double-prime Flexible Receiver as a safety class 3 system. The Flexible Receiver will be used by projects W-151 and W-320 for removing equipment from tanks C-106 and AZ-101

  1. Qualification test for the flexible receiver. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Tedeschi, D.J.

    1994-12-12

    This document provides the test plan and procedures to certify and design verify the 42{double_prime} and 4{double_prime}-6{double_prime} Flexible Receiver as a safety class 3 system. The Flexible Receiver will be used by projects W-151 and W-320 for removing equipment from tanks C-106 and AZ-101.

  2. How to Perform a Powder in Flexible Die Test

    DEFF Research Database (Denmark)

    Hancock, Mike; Nielsen, Morten Storgaard

    The “Powder in Flexible Die”-test, or PFD-test for short, proposes a new way of testing plastic properties of granular materials. The principal idea for the test originates from Dr. J.I Bech. The test has since been developed further and refined at IPL-DTU. The present work describes the equipment...

  3. Flexibility.

    Science.gov (United States)

    Humphrey, L. Dennis

    1981-01-01

    Flexibility is an important aspect of all sports and recreational activities. Flexibility can be developed and maintained by stretching exercises. Exercises designed to develop flexibility in ankle joints, knees, hips, and the lower back are presented. (JN)

  4. WindoWorks: A flexible program for computerized testing of accelerator control system electronic circuit boards

    International Nuclear Information System (INIS)

    Utterback, J.

    1993-09-01

    Since most accelerator control system circuit boards reside in a commercial bus architecture, such as CAMAC or VMEbus, a computerized test station is needed for exercising the boards. This test station is needed for the development of newly designed prototypes, for commissioning newly manufactured boards, for diagnosing boards which have failed in service, and for long term testing of boards with intermittent failure problems. WindoWorks was created to address these needs. It is a flexible program which runs on a PC compatible computer and uses a PC to bus crate interface. WindoWorks was designed to give the user a flexible way to test circuit boards. Each test is incapsulated into a window. By bringing up several different windows the user can run several different tests simultaneously. The windows are sizable, and moveable. They have data entry boxes so that the test can be customized to the users preference. The windows can be used in conjunction with each other in order to create supertests. There are several windows which are generic. They can be used to test basic functions on any VME (or CAMAC) board. There are other windows which have been created to test specific boards. New windows for testing specific boards can be easily created by a Pascal programmer using the WindoWorks framework

  5. Acceptance test procedure, 241-SY-101 Flexible Receiver System, Phase III testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1994-01-01

    This Acceptance Test Procedure is for the 241-SY-101 Flexible Receiver System, Phase III Testing. This procedure will test the sealing integrity of the Flexible Receiver System to ensure that release of waste and aerosols will be minimized during the removal of the test mixer pump from tank SY-101

  6. Steam Oxidation Testing in the Severe Accident Test Station

    Energy Technology Data Exchange (ETDEWEB)

    Pint, Bruce A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-08-01

    After the March 2011 accident at Fukushima Daiichi, Oak Ridge National Laboratory (ORNL) began conducting high temperature steam oxidation testing of candidate materials for accident tolerant fuel (ATF) cladding in August 2011 [1-11]. The ATF concept is to enhance safety margins in light water reactors (LWR) during severe accident scenarios by identifying materials with 100× slower steam oxidation rates compared to current Zr-based alloys. In 2012, the ORNL laboratory equipment was expanded and made available to the entire ATF community as the Severe Accident Test Station (SATS) [4,12]. Compared to the current UO2/Zr-based alloy fuel system, an ATF alternative would significantly reduce the rate of heat and hydrogen generation in the core during a coolant-limited severe accident [13-14]. The steam oxidation behavior of candidate materials is a key metric in the evaluation of ATF concepts and also an important input into models [15-17]. However, initial modeling work of FeCrAl cladding has used incomplete information on the physical properties of FeCrAl. Also, the steam oxidation data being collected at 1200°-1700°C is unique as no prior work has considered steam oxidation of alloys at such high temperatures. Also, because many accident scenarios include steadily increasing temperatures, the required data are not traditional isothermal exposures but exposures with varying “ramp” rates. In some cases, the steam oxidation behavior has been surprising and difficult to interpret. Thus, more fundamental information continues to be collected. In addition, more work continues to focus on commercially-manufactured tube material. This report summarizes recent work to characterize the behavior of candidate alloys exposed to high temperature steam, evaluate steam oxidation behavior in various ramp scenarios and continue to collect integral data on FeCrAl compared to conventional Zr-based cladding.

  7. Probe station for testing of ALICE silicon drift detectors

    CERN Document Server

    Humanic, T J; Piemonte, C; Rashevsky, A; Sugarbaker, E R; Vacchi, A

    2003-01-01

    Large area, 7.25 cm multiplied by 8.76 cm silicon drift detectors have been developed and are in production for the ALICE experiment at LHC. An active area of the detector of more than 50 cm**2 imposes high demands on the quality of processing and raw material. Automated testing procedures have been developed to test detectors before mounting them on the ladders. Probe stations for ALICE SDD testing were designed and built at INFN, Trieste and Ohio State University (OSU). Testing procedures, detector selection criteria and some details of the OSU probe station design are discussed.

  8. Evaluation of data from HEPA filter quality assurance testing stations

    International Nuclear Information System (INIS)

    Collins, J.T.; Bellamy, R.R.; Allen, J.R.

    1979-01-01

    In Revision 1 to Regulatory Guide 1.52, issued in July 1976, the NRC recommended that high efficiency particulate air (HEPA) filters for use in engineered safety features (ESF) atmosphere cleanup systems be visually inspected and dioctylphtalate (DOP) tested at either of two Department of Energy (DOE) operated QA Filter Testing Stations prior to their installation and use in commercial nuclear power plants. This practice was initiated because filter vendors were unable to consistently provide a HEPA filter that would meet the stringent requirements established by DOE and NRC and its predecessor the AEC. In 1977, the NRC staff undertook a program to revise Regulatory Guide 1.52 to reflect recently issued industry standards (e.g., ANSI N509 and N510) and current industry practices. Revision 2 to Regulatory Guide 1.52 was formally issued in March 1978. In conducting this review, the recommendation that HEPA filters, intended for use in ESF systems in commercial nuclear power plants, be routinely tested at the DOE-QA Filter Testing Stations was revaluated. As part of this evluation a detailed analysis of the filter test results recorded by the two QA Testing Stations during the period 1971 to 1977 was conducted. This paper summarizes the results of the analysis and explains the rationale for deleting the requirement that all HEPA filters intended for use in ESF systems be tested at the AQ Testing Station

  9. Point-of-Care Test Equipment for Flexible Laboratory Automation.

    Science.gov (United States)

    You, Won Suk; Park, Jae Jun; Jin, Sung Moon; Ryew, Sung Moo; Choi, Hyouk Ryeol

    2014-08-01

    Blood tests are some of the core clinical laboratory tests for diagnosing patients. In hospitals, an automated process called total laboratory automation, which relies on a set of sophisticated equipment, is normally adopted for blood tests. Noting that the total laboratory automation system typically requires a large footprint and significant amount of power, slim and easy-to-move blood test equipment is necessary for specific demands such as emergency departments or small-size local clinics. In this article, we present a point-of-care test system that can provide flexibility and portability with low cost. First, the system components, including a reagent tray, dispensing module, microfluidic disk rotor, and photometry scanner, and their functions are explained. Then, a scheduler algorithm to provide a point-of-care test platform with an efficient test schedule to reduce test time is introduced. Finally, the results of diagnostic tests are presented to evaluate the system. © 2014 Society for Laboratory Automation and Screening.

  10. Application of flexible scope in large testing laboratories

    Directory of Open Access Journals (Sweden)

    Carina Di Candia

    2011-04-01

    Full Text Available According as the international definition of Flexible Scope, a laboratory must demonstrate face with the accreditation body that it has the knowledge, experience and competence to work within the full range of its flexible scope, as well as possessing suitable laboratory environments and equipment. The laboratory must also demonstrate that it has a management system in place that can control its proposed approach while continuing to comply with the requirements of ISO 17025:2005. In case of UKAS (Unites Kingdom Accreditation Service, prior to offering accreditation for flexible scope they must have a high degree of confidence that the staff are technically competent and that the management system controlling certain key processes as development, review, validation and authorization.LATU apply these requirements since 2004 as "Unified Tests". Until this date, LATU was doing the same type of tests in different materials departments using different equipment, personal, and testing quality control. In order to that were defined cross disciplinary groups to analyze this topic approaching in personal competence and quality control tests improvement, and resource's decrease. For example, LATU has the Unified Test Tensile Strength accredited by UKAS in: corrugated and solid fiberboard, paper board, linerboard, cork plugs, plastic bags, plastic sheeting, paper, woven fabrics, plastic woven bags and woven plastic. As a result of the Unified Tests was generated a general unified manage procedure with unified criteria's, responsibilities and actions. Was written a unique testing procedure not only with the actual flexible scope and the flexibilities limits but also the compliance requirements of ISO 17025 and the accreditations body methodology. We could decrease the amount of documentation to control. Was defined the methodology and implemented periodicaly internal inter comparisons between departments in order to valid the unified tests and has a unique

  11. Lewis Research Center space station electric power system test facilities

    Science.gov (United States)

    Birchenough, Arthur G.; Martin, Donald F.

    1988-01-01

    NASA Lewis Research Center facilities were developed to support testing of the Space Station Electric Power System. The capabilities and plans for these facilities are described. The three facilities which are required in the Phase C/D testing, the Power Systems Facility, the Space Power Facility, and the EPS Simulation Lab, are described in detail. The responsibilities of NASA Lewis and outside groups in conducting tests are also discussed.

  12. Test Station for Measuring Aluminum Tube Geometrical Parameters

    CERN Document Server

    Oansea, D; Gongadze, A L; Gostkin, M I; Dedovich, D V; Evtoukhovitch, P G; Comanescu, B; Kotov, S A; Necsoiu, T; Potrap, I N; Rogalev, E V; Tskhadadze, E G; Chelkov, G A

    2001-01-01

    A test station for quality control of aluminum tube outer diameter and wall thickness is presented. The tested tubes are used for drift detector assembly of ATLAS (LHC, CERN) muon system. The outer diameter and wall thickness of aluminium tubes are measured by means of noncontact optical and ultrasonic methods respectively with the accuracy of 3 {\\mu}m. The testing process is automatic and interacts with the production data base.

  13. Environmental qualification test of electrical penetration for nuclear power stations

    International Nuclear Information System (INIS)

    Kooziro, Tetsuya; Nakagawa, Akitoshi; Toyoda, Shigeru; Uno, Shunpei

    1979-01-01

    Environmental qualification test was conducted according to IEEE Std. 323-1974 in order to evaluate the safety and reliability of electrical penetration of PWR type nuclear power station. Electrical penetration is the assemblies of electric cables attached to the containment vessel and penetrate through the vessel. Since it is a part of the vessel, it is deemed to be one of the primary safety equipments that are important for the safety and reliability of nuclear power stations. Environmental tests were conducted continuously as to heat cycle, vibration and LOCA with the full size specimens of bushing type, pigtail type and triaxial cable type and at the same time thermal life and irradiation tests were conducted on the insulation materials used, in order to obtain the comprehensive evaluation of their electrical and mechanical characteristics. As the result, they all satisfied the requirements for the circuits for actual use during and after various environmental qualification tests according to IEEE Std. 323. (author)

  14. A flexible and configurable system to test accelerator magnets

    Energy Technology Data Exchange (ETDEWEB)

    Jerzy M. Nogiec et al.

    2001-07-20

    Fermilab's accelerator magnet R and D programs, including production of superconducting high gradient quadrupoles for the LHC insertion regions, require rigorous yet flexible magnetic measurement systems. Measurement systems must be capable of handling various types of hardware and extensible to all measurement technologies and analysis algorithms. A tailorable software system that satisfies these requirements is discussed. This single system, capable of distributed parallel signal processing, is built on top of a flexible component-based framework that allows for easy reconfiguration and run-time modification. Both core and domain-specific components can be assembled into various magnet test or analysis systems. The system configured to comprise a rotating coil harmonics measurement is presented. Technologies as Java, OODB, XML, JavaBeans, software bus and component-based architectures are used.

  15. Modal Testing of Seven Shuttle Cargo Elements for Space Station

    Science.gov (United States)

    Kappus, Kathy O.; Driskill, Timothy C.; Parks, Russel A.; Patterson, Alan (Technical Monitor)

    2001-01-01

    From December 1996 to May 2001, the Modal and Control Dynamics Team at NASA's Marshall Space Flight Center (MSFC) conducted modal tests on seven large elements of the International Space Station. Each of these elements has been or will be launched as a Space Shuttle payload for transport to the International Space Station (ISS). Like other Shuttle payloads, modal testing of these elements was required for verification of the finite element models used in coupled loads analyses for launch and landing. The seven modal tests included three modules - Node, Laboratory, and Airlock, and four truss segments - P6, P3/P4, S1/P1, and P5. Each element was installed and tested in the Shuttle Payload Modal Test Bed at MSFC. This unique facility can accommodate any Shuttle cargo element for modal test qualification. Flexure assemblies were utilized at each Shuttle-to-payload interface to simulate a constrained boundary in the load carrying degrees of freedom. For each element, multiple-input, multiple-output burst random modal testing was the primary approach with controlled input sine sweeps for linearity assessments. The accelerometer channel counts ranged from 252 channels to 1251 channels. An overview of these tests, as well as some lessons learned, will be provided in this paper.

  16. Space Station CMIF extended duration metabolic control test

    Science.gov (United States)

    Schunk, Richard G.; Bagdigian, Robert M.; Carrasquillo, Robyn L.; Ogle, Kathryn Y.; Wieland, Paul O.

    1989-01-01

    The Space Station Extended Duration Metabolic Control Test (EMCT) was conducted at the MSFC Core Module Integration Facility. The primary objective of the EMCT was to gather performance data from a partially-closed regenerative Environmental Control and Life Support (ECLS) system functioning under steady-state conditions. Included is a description of the EMCT configuration, a summary of events, a discussion of anomalies that occurred during the test, and detailed results and analysis from individual measurements of water and gas samples taken during the test. A comparison of the physical, chemical, and microbiological methods used in the post test laboratory analyses of the water samples is included. The preprototype ECLS hardware used in the test, providing an overall process description and theory of operation for each hardware item. Analytical results pertaining to a system level mass balance and selected system power estimates are also included.

  17. Flexible electronic feedback using the virtues of progress testing.

    Science.gov (United States)

    Muijtjens, Arno M M; Timmermans, Ilske; Donkers, Jeroen; Peperkamp, Robert; Medema, Harro; Cohen-Schotanus, Janke; Thoben, Arnold; Wenink, Arnold C G; van der Vleuten, Cees P M

    2010-01-01

    The potential richness of the feedback for learners and teachers is one of the educational advantages of progress tests (PTs). Every test administration yields information on a student's knowledge level in each sub-domain of the test (cross-sectional information), and it adds a next point to the corresponding knowledge growth curve (longitudinal information). Traditional paper-based feedback has severe limitations and requires considerable effort from the learners to give meaning to the data. We reasoned that the PT data should be flexibly accessible in all pathways and with any available comparison data, according to the personal interest of the learner. For that purpose, a web-based tool (Progress test Feedback, the ProF system) was developed. This article presents the principles and features of the generated feedback and shows how it can be used. In addition to enhancement of the feedback, the ProF database of longitudinal PT-data also provides new opportunities for research on knowledge growth, and these are currently being explored.

  18. Engineering test station for TFTR blanket module experiments

    International Nuclear Information System (INIS)

    Jassby, D.L.; Leinoff, S.

    1979-12-01

    A conceptual design has been carried out for an Engineering Test Station (ETS) which will provide structural support and utilities/instrumentation services for blanket modules positioned adjacent to the vacuum vessel of the TFTR (Tokamak Fusion Test Reactor). The ETS is supported independently from the Test Cell floor. The ETS module support platform is constructed of fiberglass to eliminate electromagnetic interaction with the pulsed tokamak fields. The ETS can hold blanket modules with dimensions up to 78 cm in width, 85 cm in height, and 105 cm in depth, and with a weight up to 4000 kg. Interfaces for all utility and instrumentation requirements are made via a shield plug in the TFTR igloo shielding. The modules are readily installed or removed by means of TFTR remote handling equipment

  19. Modeling and Control of Flexible HEV Charging Station upgraded with Flywheel Energy Storage

    DEFF Research Database (Denmark)

    Dragicevic, Tomislav; Shafiee, Qobad; Wu, Dan

    2014-01-01

    This paper deals with the design of a fast DC charging station (FCS) for hybrid electric vehicles (HEVs) that is connected at a remote location. Power rating of this new technology can go up to a hundred kW and it represents a main challenge for its broad acceptance in distribution systems...

  20. Test of Seal System for Flexible Pipe End Fitting

    DEFF Research Database (Denmark)

    Banke, Lars; Jensen, Thomas Gregers

    1999-01-01

    The purpose of the end fitting seal system is to ensure leak proof termination of flexible pipes. The seal system of an NKT end fitting normally consists of a number of ring joint gaskets mounted in a steel sleeve on the outside of the polymeric inner liner of the pipe. The seal system is activated...... by compression of the gaskets, thus using the geometry to establish a seal towards the inner liner of the pipe and the steel sleeve of the end fitting. This paper describes how the seal system of an end fitting can be tested using an autoclave. By regulating temperature and pressure, the seal system can...... be tested up to 130oC and 51.7 MPa. Pressure, temperature and the mechanical behaviours of the pipe are measured for use in further research. The set-up is used to test the efficiency of the seal system as function of parameters such as cross sectional shapes of the gaskets, tolerances between gaskets...

  1. metrological performance improvement of a superconducting cable test station

    CERN Document Server

    Montenero, Giuseppe; Ballarino, Amalia

    The work presented in this PhD thesis concerns the metrological performance improvement of a superconducting cable test station based on superconducting transformers. The main cable’s parameter to be assessed –as a function of temperature and magnetic field– is the critical current, i.e. beyond this limit the phase transition to the normal state occurs. Ramping the current at levels in the order of the tens of kA can be achieved with superconducting transformers at moderate capital and operational cost. But, issues such as (i) accurate/precise measurements and (ii) monitoring of the secondary current during the device operation have to be addressed. In this regard, the goals of the thesis are the design, prototyping, and validation of a new cryogenic current transducer and effective monitoring system for test stations transformer-based. Among the available transducers for current sensing at room temperature, the DC current transformer (DCCT) provides measurement accuracy in the order of the hundreds of ...

  2. Phase III Simplified Integrated Test (SIT) results - Space Station ECLSS testing

    Science.gov (United States)

    Roberts, Barry C.; Carrasquillo, Robyn L.; Dubiel, Melissa Y.; Ogle, Kathryn Y.; Perry, Jay L.; Whitley, Ken M.

    1990-01-01

    During 1989, phase III testing of Space Station Freedom Environmental Control and Life Support Systems (ECLSS) began at Marshall Space Flight Center (MSFC) with the Simplified Integrated Test. This test, conducted at the MSFC Core Module Integration Facility (CMIF), was the first time the four baseline air revitalization subsystems were integrated together. This paper details the results and lessons learned from the phase III SIT. Future plans for testing at the MSFC CMIF are also discussed.

  3. Development of Test Protocols for International Space Station Particulate Filters

    Science.gov (United States)

    Vijayakumar, R.; Green, Robert D.; Agui, Juan H.

    2015-01-01

    Air quality control on the International Space Station (ISS) is a vital requirement for maintaining a clean environment for the crew and the hardware. This becomes a serious challenge in pressurized space compartments since no outside air ventilation is possible, and a larger particulate load is imposed on the filtration system due to lack of gravitational settling. The ISS Environmental Control and Life Support System (ECLSS) uses a filtration system that has been in use for over 14 years and has proven to meet this challenge. The heart of this system is a traditional High-Efficiency Particulate Air (HEPA) filter configured to interface with the rest of the life support elements and provide effective cabin filtration. The filter element for this system has a non-standard cross-section with a length-to-width ratio (LW) of 6.6. A filter test setup was designed and built to meet industry testing standards. A CFD analysis was performed to initially determine the optimal duct geometry and flow configuration. Both a screen and flow straighter were added to the test duct design to improve flow uniformity and face velocity profiles were subsequently measured to confirm. Flow quality and aerosol mixing assessments show that the duct flow is satisfactory for the intended leak testing. Preliminary leak testing was performed on two different ISS filters, one with known perforations and one with limited use, and results confirmed that the testing methods and photometer instrument are sensitive enough to detect and locate compromised sections of an ISS BFE.Given the engineering constraints in designing spacecraft life support systems, it is anticipated that non-industry standard filters will be required in future designs. This work is focused on developing test protocols for testing the ISS BFE filters, but the methodology is general enough to be extended to other present and future spacecraft filters. These techniques for characterizing the test duct and perform leak testing

  4. Towards Intelligence and Flexibility of Learning and Knowledge Testing Environments

    Directory of Open Access Journals (Sweden)

    Nerijus AUKSTAKALNIS

    2006-02-01

    Full Text Available The proposed goal oriented knowledge acquisition and assessment are based on the flexible educational model and allows to implement an adaptive control of the enhanced learning process according to the requirements of student's knowledge level, his state of cognition and subject learning history. The enhanced learner knowledge model specifies how the cognition state of the user will be achieved step by step. The use case actions definition is a starting point of the specification, which depends on different levels of learning scenarios and user cognition sub goals. The use case actions specification is used as a basis to set the requirements for service software specification and attributes of learning objects respectively. The paper presents the enhanced architecture of the student self-evaluation and on-line assessment system TestTool. The system is explored as an assessment engine capable of supporting and improving the individualized intelligent goal oriented self-instructional and simulation based mode of learning, grounded on the GRID distributed service architecture.

  5. Investigation of a Station Blackout Scenario with the ATLAS Test

    International Nuclear Information System (INIS)

    Kim, Yeon Sik; Yu, Xin Guo; Kang, Kyoung Ho; Park, Hyun Sik; Cho, Seok; Min, Kyeong Ho; Choi, Nam Hyeon; Kim, Bok Deuk; Park, Jong Gook; Choi, Ki Yong

    2012-01-01

    KAERI (Korea Atomic Energy Research Institute) has been operating an integral effect test facility, ATLAS (Advanced Thermal-Hydraulic Test Loop for Accident Simulation), for accident simulations pertaining to the OPR1000 (Optimized Power Reactor, 1000MWe) and the APR1400 (Advanced Power Reactor, 1400MWe) which are in operation and under construction in Korea, respectively. After the Fukushima accidents due to the combination of an earthquake followed by a tsunami in east Japan on March 11, 2011, the concept of boundary between the design basis and beyond-design basis accidents became obscure. One scenario is the station blackout (SBO), which is defined as 'the loss of all alternating current (AC) power in a nuclear power plant' by the USNRC 10CFR50 Section 50.63, which has adopted a new safety regulation for the SBO in June of 1988. In any case the SBO that occurred in Fukushima seemed to go beyond the definition of the current SBO scenario. In the mean time, numerous researches has been conducted on the safety concern of the SBO for existing and advanced nuclear power plants worldwide. From the internal review of an SBO scenario, it was concluded that the understanding of the thermo-hydraulic phenomena occurred within the reactor coolant system is a prerequisite although seemed to be quite a simple sequence of events. This was the motivation of an SBO test using the ATLAS facility. For the understanding of the physical phenomena within the primary system, an SBO was assumed with simple intial and boundary conditions, e.g. start of an SBO at time zero, no diesel and AC powers, no auxiliary feedwater pumps (motor-driven and turbine driven) etc. In this paper, overview of the SBO test results was described including a result of analytical calculations simulating the SBO test using the MARS code

  6. Acceptance test report, 241-SY-101 Flexible Receiver System, Phase 3 testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1995-01-01

    This document summarizes the results of the phase 3 acceptance test of the 241-SY-101 Flexible Receiver System (FRS). The purpose of this acceptance test is to verify the sealing integrity of the FRS to ensure that the release of waste and aerosols will be minimized during the removal of the test mixer pump from Tank 241-SY-101. The FRS is one of six major components of the Equipment Removal System, which has been designed to retrieve, transport, and store the mixer pump. This acceptance test was performed at the 306E Facility in the 300 area from January 10, 1995 to January 17, 1995. The Phase 3 test consisted of two parts. Part one was a water leak test of the seal between the blast shield and mock load distribution frame (LDF) to ensure that significant contamination of the pump pit and waste interaction with the aluminum impact-limiting material under the LDF are prevented during the pump removal operation. The second part of this acceptance test was an air leak test of the assembled flexible receiver system. The purpose of this test was to verify that the release of hazardous aerosols will be minimized if the tank dome pressure becomes slightly positive during the decontamination of the mixer pump

  7. Design and Testing of a Flexible Inclinometer Probe for Model Tests of Landslide Deep Displacement Measurement.

    Science.gov (United States)

    Zhang, Yongquan; Tang, Huiming; Li, Changdong; Lu, Guiying; Cai, Yi; Zhang, Junrong; Tan, Fulin

    2018-01-14

    The physical model test of landslides is important for studying landslide structural damage, and parameter measurement is key in this process. To meet the measurement requirements for deep displacement in landslide physical models, an automatic flexible inclinometer probe with good coupling and large deformation capacity was designed. The flexible inclinometer probe consists of several gravity acceleration sensing units that are protected and positioned by silicon encapsulation, all the units are connected to a 485-comunication bus. By sensing the two-axis tilt angle, the direction and magnitude of the displacement for a measurement unit can be calculated, then the overall displacement is accumulated according to all units, integrated from bottom to top in turn. In the conversion from angle to displacement, two spline interpolation methods are introduced to correct and resample the data; one is to interpolate the displacement after conversion, and the other is to interpolate the angle before conversion; compared with the result read from checkered paper, the latter is proved to have a better effect, with an additional condition that the displacement curve move up half the length of the unit. The flexible inclinometer is verified with respect to its principle and arrangement by a laboratory physical model test, and the test results are highly consistent with the actual deformation of the landslide model.

  8. Large-scale field testing on flexible shallow landslide barriers

    Science.gov (United States)

    Bugnion, Louis; Volkwein, Axel; Wendeler, Corinna; Roth, Andrea

    2010-05-01

    Open shallow landslides occur regularly in a wide range of natural terrains. Generally, they are difficult to predict and result in damages to properties and disruption of transportation systems. In order to improve the knowledge about the physical process itself and to develop new protection measures, large-scale field experiments were conducted in Veltheim, Switzerland. Material was released down a 30° inclined test slope into a flexible barrier. The flow as well as the impact into the barrier was monitored using various measurement techniques. Laser devices recording flow heights, a special force plate measuring normal and shear basal forces as well as load cells for impact pressures were installed along the test slope. In addition, load cells were built in the support and retaining cables of the barrier to provide data for detailed back-calculation of load distribution during impact. For the last test series an additional guiding wall in flow direction on both sides of the barrier was installed to achieve higher impact pressures in the middle of the barrier. With these guiding walls the flow is not able to spread out before hitting the barrier. A special constructed release mechanism simulating the sudden failure of the slope was designed such that about 50 m3 of mixed earth and gravel saturated with water can be released in an instant. Analysis of cable forces combined with impact pressures and velocity measurements during a test series allow us now to develop a load model for the barrier design. First numerical simulations with the software tool FARO, originally developed for rockfall barriers and afterwards calibrated for debris flow impacts, lead already to structural improvements on barrier design. Decisive for the barrier design is the first dynamic impact pressure depending on the flow velocity and afterwards the hydrostatic pressure of the complete retained material behind the barrier. Therefore volume estimation of open shallow landslides by assessing

  9. Fluid elastic instability tests on an array of tubes preferentially flexible in the flow direction

    International Nuclear Information System (INIS)

    Mureithi, N.W.; Zhang, C.; Pettigrew, M.J.

    2004-01-01

    The present work is motivated by the observation that, in the presence of flat bar supports (AVBs), U-tubes in steam generators and heat exchangers are not positively restrained in the in-plane direction. The stability behavior of a rotated triangular array is investigated in detail in the work presented here. Tubes within the array are flexible only in the flow direction. Tests are conducted with a fully flexible array, a single flexible tube, and a finite number of flexible tubes at several locations within the otherwise rigid array. In all cases tube flexibility is purely in the flow direction. The fully flexible array is shown to undergo fluid-elastic instability. Despite the unidirectional flexibility constraint, the critical instability velocity is of the same order of magnitude when compared with previous tests on an unconstrained fully flexible array. A single flexible tube, on the other hand, is found to be stable. Results of tests on partially flexible array configurations are also presented. (authors)

  10. The Space Station Photovoltaic Panels Plasma Interaction Test Program: Test plan and results

    Science.gov (United States)

    Nahra, Henry K.; Felder, Marian C.; Sater, Bernard L.; Staskus, John V.

    1989-01-01

    The Plasma Interaction Test performed on two space station solar array panels is addressed. This includes a discussion of the test requirements, test plan, experimental set-up, and test results. It was found that parasitic current collection was insignificant (0.3 percent of the solar array delivered power). The measured arcing threshold ranged from -210 to -457 V with respect to the plasma potential. Furthermore, the dynamic response of the panels showed the panel time constant to range between 1 and 5 microsec, and the panel capacitance to be between .01 and .02 microF.

  11. The Space Station photovoltaic panels plasma interaction test program - Test plan and results

    Science.gov (United States)

    Nahra, Henry K.; Felder, Marian C.; Sater, Bernard L.; Staskus, John V.

    1990-01-01

    The plasma Interaction Test performed on two space station solar array panels is addressed. This includes a discussion of the test requirements, test plan, experimental set-up, and test results. It was found that parasitic current collection was insignificant (0.3 percent of the solar array delivered power). The measured arcing threshold ranged from -210 to -457 V with respect to the plasma potential. Furthermore, the dynamic response of the panels showed the panel time constant to range between 1 and 5 microsec, and the panel capacitance to be between .01 and .02 microF.

  12. Test of thermal shields for early warning station detectors

    DEFF Research Database (Denmark)

    Petersen, Jesper

    1997-01-01

    The properties of thermal shields around NaI crystal scintillators for early warning stations have been checked in order to assure that external temperature variations cannot influence the stability of the measurements....

  13. Acceptance test report for the 241-SY-101 Flexible Receiver Gamma Detector System

    International Nuclear Information System (INIS)

    Dowell, J.L.

    1995-01-01

    This Acceptance Test Report is for the 241-SY-101 Flexible Receiver Gamma Detector System. This test verified that the data logger and data converter for the gamma detector system functions as intended

  14. Space-Based Reconfigurable Software Defined Radio Test Bed Aboard International Space Station

    Science.gov (United States)

    Reinhart, Richard C.; Lux, James P.

    2014-01-01

    The National Aeronautical and Space Administration (NASA) recently launched a new software defined radio research test bed to the International Space Station. The test bed, sponsored by the Space Communications and Navigation (SCaN) Office within NASA is referred to as the SCaN Testbed. The SCaN Testbed is a highly capable communications system, composed of three software defined radios, integrated into a flight system, and mounted to the truss of the International Space Station. Software defined radios offer the future promise of in-flight reconfigurability, autonomy, and eventually cognitive operation. The adoption of software defined radios offers space missions a new way to develop and operate space transceivers for communications and navigation. Reconfigurable or software defined radios with communications and navigation functions implemented in software or VHDL (Very High Speed Hardware Description Language) provide the capability to change the functionality of the radio during development or after launch. The ability to change the operating characteristics of a radio through software once deployed to space offers the flexibility to adapt to new science opportunities, recover from anomalies within the science payload or communication system, and potentially reduce development cost and risk by adapting generic space platforms to meet specific mission requirements. The software defined radios on the SCaN Testbed are each compliant to NASA's Space Telecommunications Radio System (STRS) Architecture. The STRS Architecture is an open, non-proprietary architecture that defines interfaces for the connections between radio components. It provides an operating environment to abstract the communication waveform application from the underlying platform specific hardware such as digital-to-analog converters, analog-to-digital converters, oscillators, RF attenuators, automatic gain control circuits, FPGAs, general-purpose processors, etc. and the interconnections among

  15. Manufacturing and testing flexible microfluidic devices with optical and electrical detection mechanisms

    NARCIS (Netherlands)

    Ivan, M.G.; Vivet, F.; Meinders, E.R.

    2010-01-01

    Flexible microfluidic devices made of poly(dimethylsiloxane) (PDMS) were manufactured by soft lithography, and tested in detection of ionic species using optical absorption spectroscopy and electrical measurements. PDMS was chosen due to its flexibility and ease of surface modification by exposure

  16. Test plan for qualification testing of the 241-SY-101 Flexible Receiver System

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1994-01-01

    A mixer pump was installed in tank 241-SY-101 on July 3, 1993, to support hydrogen mitigation testing. This test mixer pump has proven to be very successful in mitigating the large gas releases, or ''burps,'' from the tank waste. Therefore, a decision has been made to fabricate a spare pump that will be installed upon failure of the existing test pump. Before replacement activities can be initiated, equipment must be available to remove the existing pump. A pump removal system is currently being designed and fabricated that will support the retrieval, transportation and disposal of the existing pump. The Equipment Removal System consists of six major components: the flexible receiver system (FRS), the equipment storage container, the container strongback system, the container transport trailer, the support cranes, and the pump washdown system

  17. Acceptance test report, 241-SY-101 Flexible Receiver System, Phase 1 testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1995-01-01

    This document summarizes the results of the Phase 1 acceptance test of the 241-SY-101 Flexible Receiver System (FRS). This acceptance test consisted of a pressure-decay/leak test of the containment bag to verify that the seams along the length of the bag had been adequately sealed. The sealing integrity of the FRS must be verified to ensure that the release of waste and aerosols will be minimized during the removal of the test mixer pump from Tank 241-SY-101. The FRS is one of six major components of the Equipment Removal System, which has been designed to retrieve, transport, and store the mixer pump. This acceptance test was performed at Lancs Industries in Kirkland, Washington on January 17, 1995. The bag temperature-compensated pressure loss of 575 Pa was below the acceptance criteria of 625 Pa and the test results were therefore found to be acceptable. The bag manufacturer estimates that 80--90% of the pressure loss is attributed to leakage around the bag inflation valve where the pressure gage was connected. A leak detector was applied over the entire bag during the pre-tests and no leakage was found. Furthermore, the leak rate corresponding to this pressure loss is very small when compared to the acceptable leak rate of the completely assembled FRS. The sealing integrity of the assembled FRS is verified in Phase 3 testing

  18. Fuel Retrieval Sub-Project (FRS) Stuck Fuel Station Performance Test Data Report

    International Nuclear Information System (INIS)

    THIELGES, J.R.

    2000-01-01

    This document provides the test data report for Stuck Fuel Station Performance Testing in support of the Fuel Retrieval Sub-Project. The stuck fuel station was designed to provide a means of cutting open a canister barrel to release fuel elements, etc

  19. Work station learning activities: a flexible and scalable instrument for integrating across basic subjects in biomedical education.

    Science.gov (United States)

    González-Soltero, Rocío; Learte, Ana Isabel R; Sánchez, Ana Mª; Gal, Beatriz

    2017-11-29

    Establishing innovative teaching programs in biomedical education involves dealing with several national and supra-national (i.e. European) regulations as well as with new pedagogical and demographic demands. We aimed to develop and validate a suitable instrument to integrate activities across preclinical years in all Health Science Degrees while meeting requirements of national quality agencies. The new approach was conceived at two different levels: first, we identified potentially integrative units from different fields according to national learning goals established for each preclinical year (national quality agency regulations). Secondly, we implemented a new instrument that combines active methodologies in Work Station Learning Activities (WSLA), using clinical scenarios as a guiding common thread to instruct students from an integrated perspective. We evaluated students' perception through a Likert-type survey of a total of 118 students enrolled in the first year of the Bachelor's Degree in Medicine. Our model of integrated activities through WSLA is feasible, scalable and manageable with large groups of students and a minimum number of instructors, two major limitations in many medical schools. Students' perception of WSLA was positive in overall terms. Seventy nine percent of participants stated that WSLA sessions were more useful than non-integrated activities. Eighty three percent confirmed that the WSLA methodology was effective at integrating concepts covered by different subjects. The WSLA approach is a flexible and scalable instrument for moving towards integrated curricula, and it can be successfully adapted to teach basic subjects in preclinical years of Health Science degrees. WSLA can be applied to large groups of students in a variety of contexts or environments using clinical cases as connecting threads.

  20. Principal facts for about 16,000 gravity stations in the Nevada Test Site and vicinity

    International Nuclear Information System (INIS)

    Harris, R.N.; Ponce, D.A.; Oliver, H.W.; Healey, D.L.

    1989-01-01

    The Nevada Test Site (NTS) and vicinity includes portions of the Goldfield, Caliente, Death Valley, and Las Vegas. This report documents and consolidates previously published and recently compiled gravity data to establish a gravity data base of about 16,000 stations for the NTS and vicinity. While compiling data sets, redundant stations and stations having doubtful locations or gravity values were excluded. Details of compiling the gravity data sets are discussed in later sections. Where feasible, an accuracy code has been assigned to each station so that the accuracy or reliability of each station can be evaluated. This data base was used in preparing complete Bouguer and isostatic gravity maps of the NTS and vicinity. Since publication of the complete Bouguer gravity map, additional data were incorporated into the isostatic gravity map. Gravity data were compiled from five sources: 14,183 stations from the US Geological Survey (USGS), 326 stations from Exploration Data Consultants (EDCON) of Denver, Colorado, 906 stations from the Los Alamos National Laboratory (LANL), 212 stations from the University of Texas at Dallas (UTD), and 48 stations from the Defense Mapping Agency (DMA). This investigation is an effort to study several areas for potential storage of high-level radioactive waste. Gravity stations established under YMP are shown. The objective of this gravity survey was to explore for the presence of plutons. 33 refs., 24 figs., 9 tabs

  1. Principal facts for about 16,000 gravity stations in the Nevada Test Site and vicinity

    International Nuclear Information System (INIS)

    Harris, R.N.; Ponce, D.A.; Oliver, H.W.; Healey, D.L.

    1989-01-01

    The Nevada Test Site (NTS) and vicinity includes portions of the Goldfield, Caliente, Death Valley, and Las Vegas. This report documents and consolidates previously published and recently compiled gravity data to establish a gravity data base of about 16,000 stations for the NTS and vicinity. While compiling data sets, redundant stations and stations having doubtful locations or gravity values were excluded. Details of compiling the gravity data sets are discussed in later sections. Where feasible, an accuracy code has been assigned to each station so that the accuracy or reliability of each station can be evaluated. This data base was used in preparing complete Bouguer and isostatic gravity maps of the NTS and vicinity. Since publication of the complete Bouguer gravity map, additional data were incorporated into the isostatic gravity map. Gravity data were compiled from five sources: 14,183 stations from the US Geological Survey (USGS), 326 stations from Exploration Data Consultants (EDCON) of Denver, Colorado, 906 stations from the Los Alamos National Laboratory (LANL), 212 stations from the University of Texas at Dallas (UTD), and 48 stations from the Defense Mapping Agency (DMA). This investigation is an effort to study several areas for potential storage of high-level radioactive waste. Gravity stations established under YMP are shown. The objective of this gravity survey was to explore for the presence of plutons. This volume contains only compiled data

  2. Flexible electronic feedback using the virtues of progress testing

    NARCIS (Netherlands)

    Muijtjens, A.M.; Timmermans, I.; Donkers, J.; Peperkamp, R.; Medema, H.; Cohen-Schotanus, J.; Thoben, A.; Wenink, A.C.; van der Vleuten, C.P.

    2010-01-01

    The potential richness of the feedback for learners and teachers is one of the educational advantages of progress tests (PTs). Every test administration yields information on a student's knowledge level in each sub-domain of the test (cross-sectional information), and it adds a next point to the

  3. Design of a test station for the CMS HCAL waveshifter/waveguide fiber system

    CERN Document Server

    Baumbaugh, B; Kozminski, J; Lu, Q; Ruchti, R C; Wayne, M; Budd, H S; De Barbaro, P; Skup, E

    1998-01-01

    A test station has been designed and is under construction to test the quality of assembled waveguide to waveshifter fiber to be used in the scintillating tile calorimeter for the Compact Moun Solenoid (CMS) Hadron Calorimeter $9 (HCAL). The test station consists of a light tight enclosure 6.8 meters long with the ability to move a light source over almost 6 meters of fiber. Data acquisition hardware and software are under development to analyze the quality $9 of the fiber as well as motor control hardware and software to operate the moveable light source. The design and performance expectations of the test station will be presented. (6 refs).

  4. The development of a quantitative flexibility test for body armour and comparison with wearer trials.

    Science.gov (United States)

    Horsfall, I; Champion, S M; Watson, C H

    2005-05-01

    In this paper a mechanical flexibility test is developed which can be used to assess multi layer body armour systems. This is compared with a subjective manual test, and then with the results of wearer trials conducted using the recently approved ISO body armour standard ISO 14876-1 (2002). A series of trials was conducted on six different ballistic and/or stab resistant body armour types with a variety of protection levels and constructions. These were tested using the mechanical test system in which the armour was forced through a 200 mm hole by a 100 mm hemispherical plunger. The results of this test were then compared to a second set of trials in which flexibility of the same armour was assessed by manual handling and flexing of the armour. Finally an ergonomic wearer trial was conducted with four armours according to ISO 14876-1 (2002) each armour being assessed by four volunteers and the results compared to flexibility data collected in the first two trials. It was shown that the mechanical flexibility test produced results which were in good agreement with a purely subjective flexibility assessment. These results in turn showed reasonable but not exact correlation with the wearer trials. The ISO wearer trials addressed other factors such as overall comfort and fit of the systems and so the results were not purely a function of flexibility.

  5. Testing a flexible method to reduce false monsoon onsets.

    Directory of Open Access Journals (Sweden)

    Mathew Alexander Stiller-Reeve

    Full Text Available To generate information about the monsoon onset and withdrawal we have to choose a monsoon definition and apply it to data. One problem that arises is that false monsoon onsets can hamper our analysis, which is often alleviated by smoothing the data in time or space. Another problem is that local communities or stakeholder groups may define the monsoon differently. We therefore aim to develop a technique that reduces false onsets for high-resolution gridded data, while also being flexible for different requirements that can be tailored to particular end-users. In this study, we explain how we developed our technique and demonstrate how it successfully reduces false onsets and withdrawals. The presented results yield improved information about the monsoon length and its interannual variability. Due to this improvement, we are able to extract information from higher resolution data sets. This implies that we can potentially get a more detailed picture of local climate variations that can be used in more local climate application projects such as community-based adaptations.

  6. Flexible thermal cycle test equipment for concentrator solar cells

    Science.gov (United States)

    Hebert, Peter H [Glendale, CA; Brandt, Randolph J [Palmdale, CA

    2012-06-19

    A system and method for performing thermal stress testing of photovoltaic solar cells is presented. The system and method allows rapid testing of photovoltaic solar cells under controllable thermal conditions. The system and method presents a means of rapidly applying thermal stresses to one or more photovoltaic solar cells in a consistent and repeatable manner.

  7. Automation Hooks Architecture Trade Study for Flexible Test Orchestration

    Science.gov (United States)

    Lansdowne, Chatwin A.; Maclean, John R.; Graffagnino, Frank J.; McCartney, Patrick A.

    2010-01-01

    We describe the conclusions of a technology and communities survey supported by concurrent and follow-on proof-of-concept prototyping to evaluate feasibility of defining a durable, versatile, reliable, visible software interface to support strategic modularization of test software development. The objective is that test sets and support software with diverse origins, ages, and abilities can be reliably integrated into test configurations that assemble and tear down and reassemble with scalable complexity in order to conduct both parametric tests and monitored trial runs. The resulting approach is based on integration of three recognized technologies that are currently gaining acceptance within the test industry and when combined provide a simple, open and scalable test orchestration architecture that addresses the objectives of the Automation Hooks task. The technologies are automated discovery using multicast DNS Zero Configuration Networking (zeroconf), commanding and data retrieval using resource-oriented Restful Web Services, and XML data transfer formats based on Automatic Test Markup Language (ATML). This open-source standards-based approach provides direct integration with existing commercial off-the-shelf (COTS) analysis software tools.

  8. Summary of ROSA-4 LSTF first phase test program and station blackout (TMLB) test results

    International Nuclear Information System (INIS)

    Tasaka, K.; Kukita, Y.; Anoda, Y.

    1990-01-01

    This paper summarizes major test results obtained at the ROSA-4 Large Scale Test Facility (LSTF) during the first phase of the test program. The results from a station blackout (TMLB) test conducted at the end of the first-phase program are described in some detail. The LSTF is an integral test facility being operated by the Japan Atomic Energy Research Institute for simulation of pressurized water reactor (PWR) thermal-hydraulic responses during small-break loss-of-coolant accidents (SBLOCAs) and operational/abnormal transients. It is a 1/48 volumetrically scaled, full-height, full-pressure simulator of a Westinghouse-type 4-loop PWR. The facility includes two symmetric primary loops each one containing an active inverted-U tube steam generator and an active reactor coolant pump. The loop horizontal legs are sized to conserve the scaled (1/24) volumes as well as the length to the square root of the diameter ratio in order to simulate the two-phase flow regime transitions. The primary objective of the LSTF first-phase program was to define the fundamental PWR thermal-hydraulic responses during SBLOCAs and transients. Most of the tests were conducted with simulated component/operator failures, including unavailability of the high pressure injection system and auxiliary feedwater system, as well as operator failure to take corrective actions. The forty-two first phase tests included twenty-nine SBLOCA tests conducted mainly for cold leg breaks, three abnormal transient tests and ten natural circulation tests. Attempts were made in several of the SBLOCA tests to simulate the plant recovery procedures as well as candidate accident management measures for prevention of high-pressure core melt situation. The natural circulation tests simulated the single-phase and two-phase natural circulation as well as reflux condensation behavior in the primary loops in steady or quasi-steady states

  9. Hydraulic pressure pulses with elastic and plastic structural flexibility: test and analysis (LWBR Development Program)

    International Nuclear Information System (INIS)

    Schwirian, R.E.

    1978-03-01

    Pressure pulse tests were conducted with a flexible test section in a test vessel filled with room temperature water. The pressure pulses were generated with a drop hammer and piston pulse generator and were of a sufficient magnitude to cause plastic deformation of the test section. Because of the strong pressure relief effect of the deforming test section, pressure pulse magnitudes were below 265 psig in magnitude and had durations of 50 to 55 msecs. Calculations performed with the FLASH-35 bi-linear hysteresis model of structural deformation show good agreement with experiment. In particular, FLASH 35 adequately predicts the decrease in peak pressure and the increase in pulse duration due to elastic and plastic deformation of the test section. Predictions of flexible member motion are good, but are less satisfactory than the pressure pulse results due to uncertainties in the values of yield point and beyond yield stiffness used to model the various flexible members. Coupled with this is a strong sensitivity of the FLASH 35 predictions to the values of yield point and beyond yield stiffness chosen for the various flexible members. The test data versus calculation comparisons presented here provide preliminary qualification for FLASH 35 calculations of transient hydraulic pressures and pressure differentials in the presence of flexible structural members which deform both elastically and plastically

  10. Acceptance test report, 241-SY-101 Flexible Receiver System, Phase 2 testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1995-01-01

    This document summarizes the results of the Phase 2 acceptance test of the 241-SY-101 Flexible Receiver System (FRS). The FRS is one of six major components of the Equipment Removal System, which has been designed to retrieve, transport, and store the test mixer pump currently installed in Tank 241-SY-101. The purpose of this acceptance test is to verify the strength of the containment bag and bag bottom cinching mechanism. It is postulated that 68 gallons of waste could be trapped inside the pump internals. The bag must be capable of supporting this waste if it shakes loose and drains to the bottom of the bag after the bag bottom has been cinched closed. This acceptance test was performed at the Maintenance and Storage Facility (MASF) Facility in the 400 area on January 23, 1995. The bag assembly supported the weight of 920 kg (2,020 lbs) of water with no leakage or damage to the bag. This value meets the acceptance criteria of 910 kg of water and therefore the results were found to be acceptable. The maximum volume of liquid expected to be held up in the pump internals is 258 L (68 gallons), which corresponds to 410 kg. This test weight gives just over a safety factor of 2. The bag also supported a small shock load while it was filled with water when the crane hoisted the bag assembly up and down. Based on the strength rating of the bag components, the bag assembly should support 2--3 times the test weight of 910 kg

  11. Manufacturing and testing flexible microfluidic devices with optical and electrical detection mechanisms

    OpenAIRE

    Ivan, M.G.; Vivet, F.; Meinders, E.R.

    2010-01-01

    Flexible microfluidic devices made of poly(dimethylsiloxane) (PDMS) were manufactured by soft lithography, and tested in detection of ionic species using optical absorption spectroscopy and electrical measurements. PDMS was chosen due to its flexibility and ease of surface modification by exposure to plasma and UV treatment, its transparency in UV-Vis regions of the light spectrum, and biocompatibility. The dual-detection mechanism allows the user more freedom in choosing the detection tool, ...

  12. Diagnostic testing and repair of Hollingsworth Generating Station`s Unit One

    Energy Technology Data Exchange (ETDEWEB)

    Atkins, R.; Epple, W.; Stevenson, D. [Great Lakes Power Ltd., Sault Ste. Marie, ON (Canada); Brotherton, L.; Crahan, M.; Ghate, A.

    1995-12-31

    A case history of the diagnosis and corrections implemented to resolve vibration problems in a 22,222 kVA hydroelectric generator was presented. The problem prevented the utility from operating the unit throughout the range of its nameplate rating and caused periodic failures of the generator`s guide and thrust bearing. Tests identified that the rim assembly was fastened onto the spider in a manner that resulted in tilting of the rim with respect to the axis of rotation, consequently, there was an unbalanced generator static air gap. A unique repair was implemented to fully restore the rim assembly to its proper position. Problems associated with carrying out such major in-situ repairs in a remote environment and within a scheduled maintenance outage were discussed. Economic benefits and costs associated with the repair were also discussed.

  13. EOS suspension test for the assessment of spinal flexibility in adolescent idiopathic scoliosis.

    Science.gov (United States)

    Hirsch, Caroline; Ilharreborde, Brice; Mazda, Keyvan

    2015-07-01

    The assessment of spinal flexibility is essential for the planning of adolescent idiopathic scoliosis (AIS) surgery. Various radiographic methods have been used but none of them has shown any superiority. The new low-dose stereography system EOS (EOS imaging, Paris, France) captures whole body images in a single scan without vertical distortion. EOS is now used in routine clinical use for AIS follow-up. The aim of this study was to prospectively evaluate the feasibility and the reproducibility of a new suspension test during the EOS imaging for the assessment of spinal flexibility in AIS. Fifty AIS patients scheduled for surgery were prospectively included. For each patient, a standard EOS radiograph was obtained, then a suspension test in the EOS and a classic traction test on the cotrel frame were performed. The examinations were compared in terms of radiation exposure, tolerance, mean traction force, and Cobb angle reduction for each curve. Axial and sagittal reductions during suspension were analyzed on three-dimensional EOS reconstructions. The tolerance of the suspension test was lower than the traction test but it was less operator dependent. Radiation exposure was 7 times lower during the suspension test. Cobb angle reductions achieved in the proximal and main curves by the two tests were similar. The traction test achieved greater reduction of the distal curve. Flexibility in the axial plane and in the sagittal plane was analyzed with the suspension test. The reduction in apical rotation was not correlated with the reduction in Cobb angle. The EOS suspension test can be used for the assessment of spinal flexibility in AIS. It gives a global vision of the deformity with new flexibility indices in the axial and sagittal planes.

  14. Hydrogeological investigations in two boreholes in the Stripa test station

    International Nuclear Information System (INIS)

    Hansson, K.; Almen, K.-E.; Ekman, L.

    1978-01-01

    The investigations included the following: water injection tests in a horizontal core-borehole, Dbh 2; hydrostatic pressure tests in Dbh2; determination of permeability in a vertical core-borehole, Dbh VI. The results of the water injection tests gave very little information due to the fact, that an air cushion was trapped in the borehole. The hydrostatic pressure tests in Dbh 2 were made in that part of the borehole, which is situated beyond the drift (45 - 97 m). Most of the pressure curves were difficult to interpret. The hydrostatic pressure in the section 89 - 97 m (end of the hole) was calculated to 1,67 Mpa. Near the end of the drift (46.00 - 49.71 m) the pressure was 0.22 Mpa. The permeability tests in Dbh VI were performed by measuring the water-flow and hydrostatic pressure in different levels. The calculated average permeability was 6.5x10 -10 m/s

  15. Basic performance tests on vibration of support structure with flexible plates for ITER tokamak device

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Kakudate, Satoshi; Shibanuma, Kiyoshi

    2005-01-01

    The vibration experiments of the support structures with flexible plates for the ITER major components such as toroidal field coil (TF coil) and vacuum vessel (VV) were performed using small-sized flexible plates aiming to obtain its basic mechanical characteristics such as dependence of the stiffness on the loading angle. The experimental results obtained by the hammering and frequency sweep tests were agreed each other, so that the experimental method is found to be reliable. In addition, the experimental results were compared with the analytical ones in order to estimate an adequate analytical model for ITER support structure with flexible plates. As a result, the bolt connection of the flexible plates on the base plate strongly affected on the stiffness of the flexible plates. After studies of modeling the bolts, it is found that the analytical results modeling the bolts with finite stiffness only in the axial direction and infinite stiffness in the other directions agree well with the experimental ones. Using this adequate model, the stiffness of the support structure with flexible plates for the ITER major components can be calculated precisely in order to estimate the dynamic behaviors such as eigen modes and amplitude of deformation of the major components of the ITER tokamak device. (author)

  16. Realization of station for testing asynchronous three-phase motors

    Science.gov (United States)

    Wróbel, A.; Surma, W.

    2016-08-01

    Nowadays, you cannot imagine the construction and operation of machines without the use of electric motors [13-15]. The proposed position is designed to allow testing of asynchronous three-phase motors. The position consists of a tested engine and the engine running as a load, both engines combined with a mechanical clutch [2]. The value of the load is recorded by measuring shaft created with Strain Gauge Bridge. This concept will allow to study the basic parameters of the engines, visualization motor parameters both vector and scalar controlled, during varying load drive system. In addition, registration during the variable physical parameters of the working electric motor, controlled by a frequency converter or controlled by a contactor will be possible. Position is designed as a teaching and research position to characterize the engines. It will be also possible selection of inverter parameters.

  17. 2000 MCM electrical power jumper cable with controlled flexibility: Design and life cycle test

    International Nuclear Information System (INIS)

    Bultman, D.H.; Sims, J.R.; Reass, W.A.

    1989-01-01

    The ZTH Reversed Field Pinch (RFP) plasma confinement experiment being built at the Los Alamos National Laboratory will use magnet coils to provide ohmic heating currents in the plasma. The ohmic heating coils are supported by a structure that will allow them limited movement with respect to surrounding hardware and the connecting electrical bus work. To minimize displacement-induced stresses in the coils, ''flexible'' power conducting links are necessary to accommodate the relative motion between the bus work and the coils. A semi-flexible 2000 MCM jumper cable has been designed with enough flexibility to allow free movement of the coils, yet it is stiff enough to withstand large magnetically-induced lateral loads and minimize the effect of the lateral loads on the magnet coil leads. A full-power life cycle test of the jumper was performed under magnetic, thermal and dynamic loads that closely simulate the expected operating conditions. This test evaluated the structural and electrical integrity of the jumper as well as the quality and reliability of the bolted electrical connections at the jumper ends in a high-stress, cyclic-loading environment. The jumper cable design is presented with an explanation of the requirements for a semi-flexible link. A description of the life cycle test and test results are given, as well as a description of the test apparatus and setup. 4 figs

  18. Space Station Environmental Control and Life Support System Test Facility at Marshall Space Flight Center

    Science.gov (United States)

    Springer, Darlene

    1989-01-01

    Different aspects of Space Station Environmental Control and Life Support System (ECLSS) testing are currently taking place at Marshall Space Flight Center (MSFC). Unique to this testing is the variety of test areas and the fact that all are located in one building. The north high bay of building 4755, the Core Module Integration Facility (CMIF), contains the following test areas: the Subsystem Test Area, the Comparative Test Area, the Process Material Management System (PMMS), the Core Module Simulator (CMS), the End-use Equipment Facility (EEF), and the Pre-development Operational System Test (POST) Area. This paper addresses the facility that supports these test areas and briefly describes the testing in each area. Future plans for the building and Space Station module configurations will also be discussed.

  19. Photovoltaic power generation field test at Saigo Police Station (police station in a heavy-snow district); Saigo keisatsusho taiyoko hatsuden field test jigyo (sekisetsu chiku no keisatsusho)

    Energy Technology Data Exchange (ETDEWEB)

    Matsuo, S. [Shimane Prefectural Police Department, Shimane (Japan)

    1997-05-30

    Contents of a fiscal 1996 photovoltaic power generation field test at a police station in a heavy-snow district are reported. The system is on the rooftop of the garage of Saigo Police Station, Saigo-cho, Shimane Prefecture, and is used for lighting, airconditioning, etc., in the police station. It is 15kW in capacity and operates on high-voltage interconnection (with back flow). The array is a 9-series/17-parallel (polycrystalline modules) system, facing 15deg eastward from due south and inclined at an angle of elevation of 17deg. Dead space on the roof is used for solar cell installation, and the applicability and stability of the photovoltaic power generation system, as installed at a police station in a heavy-snow district, were verified and, at the same, operation data were collected. The data will serve as guidelines for construction in the future, and will enable understanding about how a distributed type power generation plant should be on an isolated island. The compilation of various data about its system interconnection (with back flow) with the commercial power source is meaningful because it will work effectively in popularizing the photovoltaic power generation system. Efforts to appeal to the local population are under way, which includes letting visitors into a terrace, distributing advertising pamphlets, etc., which are quite effective in enlightening people of the new energy producing technology

  20. The use of a flexible patch leaving rule under exploitative competition: a field test with swans

    NARCIS (Netherlands)

    Nolet, B.A.; Klaassen, R.H.G.; Mooij, W.M.

    2006-01-01

    Learning animals are predicted to use a flexible patch-leaving threshold (PLT) while foraging in a depletable environment under exploitative competition. This prediction was tested in flock-feeding Bewick's swans (Cygnus columbianus bewickii) depleting hidden tubers of fennel pondweed (Potamogeton

  1. Testing of the coping flexibility hypothesis based on the dual-process theory: Relationships between coping flexibility and depressive Symptoms.

    Science.gov (United States)

    Kato, Tsukasa

    2015-12-15

    According to the dual-process theory of coping flexibility (Kato, 2012), coping flexibility is the ability to discontinue an ineffective coping strategy (i.e., evaluation coping process) and implement an alternative strategy (i.e., adaptive coping process). The coping flexibility hypothesis (CFH) proposes that the ability to engage in flexible coping is related to better psychological functioning and physical health, including less depression. I the present study, participants were 393 American Whites, 429 Australian Whites, and 496 Chinese, selected from the data pool of the 2013 Coping and Health Survey (see Kato, 2014b). They completed both the Coping Flexibility Scale (Kato, 2012), which is based on the dual-process theory of coping flexibility, and the Center for Epidemiologic Studies Depression Scale (CES-D). For all nationalities and genders, evaluation coping and adaptive coping were significantly correlated with lower levels of depressive symptoms. Structural equation modeling revealed that evaluation coping was associated with lower depressive symptoms for all nationalities and genders, whereas no significant relationships between adaptive coping and depressive symptoms were found for any nationalities. Our results partially supported that the CFH fits with the dual-process theory of coping flexibility. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.

  2. Flexible test automation a software framework for easily developing measurement applications

    CERN Document Server

    Arpaia, Pasquale; De Matteis, Ernesto

    2014-01-01

    In laboratory management of an industrial test division, a test laboratory, or a research center, one of the main activities is producing suitable software for automatic benches by satisfying a given set of requirements. This activity is particularly costly and burdensome when test requirements are variable over time. If the batches of objects have small size and frequent occurrence, the activity of measurement automation becomes predominating with respect to the test execution. Flexible Test Automation shows the development of a software framework as a useful solution to satisfy this exigency. The framework supports the user in producing measurement applications for a wide range of requirements with low effort and development time.

  3. Mechanism Design and Testing of a Self-Deploying Structure Using Flexible Composite Tape Springs

    Science.gov (United States)

    Footdale, Joseph N.; Murphey, Thomas W.

    2014-01-01

    The detailed mechanical design of a novel deployable support structure that positions and tensions a membrane optic for space imagining applications is presented. This is a complex three-dimensional deployment using freely deploying rollable composite tape spring booms that become load bearing structural members at full deployment. The deployment tests successfully demonstrate a new architecture based on rolled and freely deployed composite tape spring members that achieve simultaneous deployment without mechanical synchronization. Proper design of the flexible component mounting interface and constraint systems, which were critical in achieving a functioning unit, are described. These flexible composite components have much potential for advancing the state of the art in deployable structures, but have yet to be widely adopted. This paper demonstrates the feasibility and advantages of implementing flexible composite components, including the design details on how to integrate with required traditional mechanisms.

  4. Microwave energy transmission test toward the SPS using the space station

    Energy Technology Data Exchange (ETDEWEB)

    Kaya, N.; Matsumoto, H.; Miyatake, S.; Kimura, I.; Nagatomo, M.

    1986-12-01

    An outline of a project METT (Microwave Energy Transmission Test) using the Space Station is described. The objectives of the METT are to develop and test the technology of microwave energy transmission for the future Solar Power Satellite (SPS), and to estimate the environmental effects of the high power microwaves on the ionosphere and the atmosphere. Energy generated with solar cells is transmitted from a transmitting antenna on the bus platform near the Space Station to a rectenna on the sub-satellite or the ground station in order to test the total efficiency and the functions of the developed system of the energy transmission. Plasma similar to that in the D and E layers in the ionosphere is produced in a large balloon opened on the sub-satellite in order to investigate possible interactions between the SPS microwave and the ionospheric plasma and to determine the maximum power density of the microwave beam which passes through the ionosphere.

  5. Comprehensive Test Ban Treaty (CTBT) monitoring station operating regime influence on radionuclide detection sensitivity

    International Nuclear Information System (INIS)

    Williams, D.L.

    1999-01-01

    International Monitoring System (IMS) stations are being deployed worldwide in support of the Comprehensive [Nuclear] Test Ban Treaty (CTBT). The highly sensitive radionuclide monitoring stations regularly sample airborne radionuclide particulates to determine whether fission products are present in the atmosphere that may be indicative of a nuclear weapons test. Standards have been set for these stations regarding their operation regime and the minimum detectable concentrations (MDCs) for specific radionuclides likely to be present after a nuclear weapons test. This study uses actual CTBT monitoring data to relate a subset of the specified operational standards with the listed MDC limits. It is determined that a relationship exists between the specified operational regime and the MDC values. Since the background radioactivity is largely a function of the radon and thoron progeny, longer decay operational regimes allow for a reduction in the background. For longer lived radionuclides, this corresponds to a reduction in MDC. (author)

  6. A PC-based Flexible Solution for Virtual Instrumentation of a Multi-Purpose Test Bed

    Directory of Open Access Journals (Sweden)

    Benatzky Christian

    2006-11-01

    Full Text Available The aim of the paper is to give an overview of a test bed set up for lightweight flexible structures. The purpose of the test bed is to compare different concepts for suppressing structural vibrations. It is demonstrated that such a complex measurement and actuation task can be easily implemented on a single PC using standard software like Matlab/SIMULINK® with a minimum of custom hardware. With the help of this PC standard engineering tasks like measuring, identification of transfer functions, as well as controller design and implementation in soft real-time can be carried out easily (rapid prototyping. The resulting system is flexible and scalable, enabling an engineer to perform all the above mentioned tasks for a given test object within minimum time. Additionally, the utilization of Matlab/SIMULINK® facilitates the realization of a versatile virtual instrumentation system which is easy to use and may also be remote-controlled.

  7. Provision of Flexible Load Control by Multi-Flywheel-Energy-Storage System in Electrical Vehicle Charging Stations

    DEFF Research Database (Denmark)

    Sun, Bo; Dragicevic, Tomislav; Andrade, Fabio

    2015-01-01

    in order to support basic electrical operation. This paper proposes a local implementation of a hysteresis-based aggregation algorithm for coordinated control of multiple stations that can provide functions such as peak shaving, spinning reserves, frequency control, regulation and load following. Local......Electrical vehicle (EV) chargers are going to occupy a considerable portion of total energy consumption in the future smart grid. Fast charging stations (FCS), as the most demanding representatives of charging infrastructure, will be requested to provide some ancillary services to the power system...... stability. Finally, corresponding hardware in the loop results based on dSPACE1006 platform have been reported in order to verify the validity of proposed approach....

  8. Realisation and instrumentation of high current power station for superconducting cables testing

    International Nuclear Information System (INIS)

    Regnaud, S.

    2000-05-01

    This report deals with the designing of a high current station able to test electric properties of superconductors. This test station will be used for testing the superconducting wires of large hadron collider detectors in CERN. The high current test station will have to generate high intensity continuous current in a magnetic field of 0 to 5 tesla and in temperature conditions of 4.2 K. The length of wire samples submitted to the uniform magnetic field is 300 mm and the installation is fitted with equipment able to measure the magnetic field perpendicular to either faces of the wire. The peculiarity of this station is to use a superconducting transformer in order to generate the high current. The first part of this work recalls important notions concerning superconductivity. The second part presents the high current station by describing the superconducting transformer and the sample-holder. We have studied the designing of a transformer able to yield a secondary current whose intensity reaches 100 kA, such intensity generates powerful electromagnetic forces (566 kN/m) in case of defect, so the sample-holder has to be carefully design to bear them. The third part presents the cryogenic component of the station, the instrumentation of the sample-holder and the method used to measure secondary currents. In the last part we present the performance of a prototype transformer, this prototype is able to deliver a 22 kA secondary current for a 160 A primary current, the uncertainty on the measured value of the secondary current is about 3%

  9. Research on efficiency test of a turbine in Khan Khwar hydropower station

    International Nuclear Information System (INIS)

    Zhang, H K; Liang, Z; Deng, M G; Liu, X B; Wang, H Y; Liu, D M

    2012-01-01

    The efficiency test is an important indicator to evaluate the energy conversion performance of a hydraulic turbine. For hydropower stations which do not have the direct flow measurement conditions, whether the characteristic curve of a turbine obtained through similarity theory conversion by using the comprehensive characteristic curve of the turbine can correctly reflect the operating performance of the prototype unit is a key issue in this industry. By taking the No.1 unit of Khan Khwar hydropower station as the example, the efficiency test of this turbine was studied on the site, including the measurement method of test parameters, the configuration of the computer test system, as well as the processing and analysis of test data.

  10. On Dimensions of OTA Setups for Massive MIMO Base Stations Radiated Testing

    DEFF Research Database (Denmark)

    Kyösti, Pekka; Fan, Wei; Pedersen, Gert F.

    2016-01-01

    The development of base stations (BS) with large aperture antenna arrays, enabled partially by the utilization of cmWave and mmWave frequency bands, will require radiated testing in fading conditions. In this paper, the objective is to investigate the suitable measurement distances and physical...

  11. Automation Hooks Architecture for Flexible Test Orchestration - Concept Development and Validation

    Science.gov (United States)

    Lansdowne, C. A.; Maclean, John R.; Winton, Chris; McCartney, Pat

    2011-01-01

    The Automation Hooks Architecture Trade Study for Flexible Test Orchestration sought a standardized data-driven alternative to conventional automated test programming interfaces. The study recommended composing the interface using multicast DNS (mDNS/SD) service discovery, Representational State Transfer (Restful) Web Services, and Automatic Test Markup Language (ATML). We describe additional efforts to rapidly mature the Automation Hooks Architecture candidate interface definition by validating it in a broad spectrum of applications. These activities have allowed us to further refine our concepts and provide observations directed toward objectives of economy, scalability, versatility, performance, severability, maintainability, scriptability and others.

  12. Space station environmental control and life support systems test bed program - an overview

    Science.gov (United States)

    Behrend, Albert F.

    As the National Aeronautics and Space Administration (NASA) begins to intensify activities for development of the Space Station, decisions must be made concerning the technical state of the art that will be baselined for the initial Space Station system. These decisions are important because significant potential exists for enhancing system performance and for reducing life-cycle costs. However, intelligent decisions cannot be made without an adequate assessment of new and ready technologies, i.e., technologies which are sufficiently mature to allow predevelopment demonstrations to prove their application feasibility and to quantify the risk associated with their development. Therefore, the NASA has implemented a technology development program which includes the establishment of generic test bed capabilities in which these new technologies and approaches can be tested at the prototype level. One major Space Station subsystem discipline in which this program has been implemented is the environmental control and life support system (ECLSS). Previous manned space programs such as Gemini, Apollo, and Space Shuttle have relied heavily on consumables to provide environmental control and life support services. However, with the advent of a long-duration Space Station, consumables must be reduced within technological limits to minimize Space Station resupply penalties and operational costs. The use of advanced environmental control and life support approaches involving regenerative processes offers the best solution for significant consumables reduction while also providing system evolutionary growth capability. Consequently, the demonstration of these "new technologies" as viable options for inclusion in the baseline that will be available to support a Space Station initial operational capability in the early 1990's becomes of paramount importance. The mechanism by which the maturity of these new regenerative life support technologies will be demonstrated is the Space

  13. Space Station Freedom environmental control and life support system phase 3 simplified integrated test detailed report

    Science.gov (United States)

    Roberts, B. C.; Carrasquillo, R. L.; Dubiel, M. Y.; Ogle, K. Y.; Perry, J. L.; Whitley, K. M.

    1990-01-01

    A description of the phase 3 simplified integrated test (SIT) conducted at the Marshall Space Flight Center (MSFC) Core Module Integration Facility (CMIF) in 1989 is presented. This was the first test in the phase 3 series integrated environmental control and life support systems (ECLSS) tests. The basic goal of the SIT was to achieve full integration of the baseline air revitalization (AR) subsystems for Space Station Freedom. Included is a description of the SIT configuration, a performance analysis of each subsystem, results from air and water sampling, and a discussion of lessons learned from the test. Also included is a full description of the preprototype ECLSS hardware used in the test.

  14. Corrective Action Plan for Corrective Action Unit 490: Station 44 Burn Area, Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    K. B. Campbell

    2002-04-01

    Corrective Action Unit (CAU) 490, Station 44 Burn Area is located on the Tonopah Test Range (TTR). CAU 490 is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) and includes for Corrective Action Sites (CASs): (1) Fire Training Area (CAS 03-56-001-03BA); (2) Station 44 Burn Area (CAS RG-56-001-RGBA); (3) Sandia Service Yard (CAS 03-58-001-03FN); and (4) Gun Propellant Burn Area (CAS 09-54-001-09L2).

  15. A new XUV optical end-station to characterize compact and flexible photonic devices using synchrotron radiation

    Science.gov (United States)

    Marcelli, A.; Mazuritskiy, M. I.; Dabagov, S. B.; Hampai, D.; Lerer, A. M.; Izotova, E. A.; D'Elia, A.; Turchini, S.; Zema, N.; Zuccaro, F.; de Simone, M.; Javad Rezvani, S.; Coreno, M.

    2018-03-01

    In this contribution we present the new experimental end-station to characterize XUV diffractive optics, such as Micro Channel Plates (MCPs) and other polycapillary optics, presently under commission at the Elettra synchrotron radiation laboratory (Trieste, Italy). To show the opportunities offered by these new optical devices for 3rd and 4th generation radiation sources, in this work we present also some patterns collected at different energies of the primary XUV radiation transmitted by MCP optical devices working in the normal incidence geometry.

  16. Corrective action decision document, Second Gas Station, Tonopah test range, Nevada (Corrective Action Unit No. 403)

    International Nuclear Information System (INIS)

    1997-11-01

    This Corrective Action Decision Document (CADD) for Second Gas Station (Corrective Action Unit [CAU] No. 403) has been developed for the U.S. Department of Energy's (DOE) Nevada Environmental Restoration Project to meet the requirements of the Federal Facility Agreement and Consent Order (FFACO) of 1996 as stated in Appendix VI, open-quotes Corrective Action Strategyclose quotes (FFACO, 1996). The Second Gas Station Corrective Action Site (CAS) No. 03-02-004-0360 is the only CAS in CAU No. 403. The Second Gas Station CAS is located within Area 3 of the Tonopah Test Range (TTR), west of the Main Road at the location of former Underground Storage Tanks (USTs) and their associated fuel dispensary stations. The TTR is approximately 225 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada, by air and approximately 56 km (35 mi) southeast of Tonopah, Nevada, by road. The TTR is bordered on the south, east, and west by the Nellis Air Force Range and on the north by sparsely populated public land administered by the Bureau of Land Management and the U.S. Forest Service. The Second Gas Station CAS was formerly known as the Underground Diesel Tank Site, Sandia Environmental Restoration Site Number 118. The gas station was in use from approximately 1965 to 1980. The USTs were originally thought to be located 11 meters (m) (36 feet [ft]) east of the Old Light Duty Shop, Building 0360, and consisted of one gasoline UST (southern tank) and one diesel UST (northern tank) (DOE/NV, 1996a). The two associated fuel dispensary stations were located northeast (diesel) and southeast (gasoline) of Building 0360 (CAU 423). Presently the site is used as a parking lot, Building 0360 is used for mechanical repairs of vehicles

  17. Aerothermal Ground Testing of Flexible Thermal Protection Systems for Hypersonic Inflatable Aerodynamic Decelerators

    Science.gov (United States)

    Bruce, Walter E., III; Mesick, Nathaniel J.; Ferlemann, Paul G.; Siemers, Paul M., III; DelCorso, Joseph A.; Hughes, Stephen J.; Tobin, Steven A.; Kardell, Matthew P.

    2012-01-01

    Flexible TPS development involves ground testing and analysis necessary to characterize performance of the FTPS candidates prior to flight testing. This paper provides an overview of the analysis and ground testing efforts performed over the last year at the NASA Langley Research Center and in the Boeing Large-Core Arc Tunnel (LCAT). In the LCAT test series, material layups were subjected to aerothermal loads commensurate with peak re-entry conditions enveloping a range of HIAD mission trajectories. The FTPS layups were tested over a heat flux range from 20 to 50 W/cm with associated surface pressures of 3 to 8 kPa. To support the testing effort a significant redesign of the existing shear (wedge) model holder from previous testing efforts was undertaken to develop a new test technique for supporting and evaluating the FTPS in the high-temperature, arc jet flow. Since the FTPS test samples typically experience a geometry change during testing, computational fluid dynamic (CFD) models of the arc jet flow field and test model were developed to support the testing effort. The CFD results were used to help determine the test conditions experienced by the test samples as the surface geometry changes. This paper includes an overview of the Boeing LCAT facility, the general approach for testing FTPS, CFD analysis methodology and results, model holder design and test methodology, and selected thermal results of several FTPS layups.

  18. SB certification handout material requirements, test methods, responsibilities, and minimum classification levels for mixture-based specification for flexible base.

    Science.gov (United States)

    2012-10-01

    A handout with tables representing the material requirements, test methods, responsibilities, and minimum classification levels mixture-based specification for flexible base and details on aggregate and test methods employed, along with agency and co...

  19. Strength assessment of a cryostat used by the hollow electron test station.

    CERN Document Server

    Efremov, Filip

    2015-01-01

    The following report explains the work I have done on my summer student work project and the experience I have gained during the process. The work consisted of a strength assessment of a cryogenic vacuum insulated vessel according to European regulations. The cryogenic vacuum insulated vessel is used for the cooling of the solenoids. The solenoids are used in the hollow electron test station and create the magnetic fields used for testing electron guns and validating the concept of a hollow electron lens.

  20. Tests of shielding effectiveness of Kevlar and Nextel onboard the International Space Station and the Foton-M3 capsule.

    Science.gov (United States)

    Pugliese, M; Bengin, V; Casolino, M; Roca, V; Zanini, A; Durante, M

    2010-08-01

    Radiation assessment and protection in space is the first step in planning future missions to the Moon and Mars, where mission and number of space travelers will increase and the protection of the geomagnetic shielding against the cosmic radiation will be absent. In this framework, the shielding effectiveness of two flexible materials, Kevlar and Nextel, were tested, which are largely used in the construction of spacecrafts. Accelerator-based tests clearly demonstrated that Kevlar is an excellent shield for heavy ions, close to polyethylene, whereas Nextel shows poor shielding characteristics. Measurements on flight performed onboard of the International Space Station and of the Foton-M3 capsule have been carried out with special attention to the neutron component; shielded and unshielded detectors (thermoluminescence dosemeters, bubble detectors) were exposed to a real radiation environment to test the shielding properties of the materials under study. The results indicate no significant effects of shielding, suggesting that thin shields in low-Earth Orbit have little effect on absorbed dose.

  1. Signal Processing for Indian and Pakistan Nuclear Tests Recorded at IMS Stations Located in Israel

    Science.gov (United States)

    Gitterman, Y.; Pinsky, V.; Hofstetter, R.

    - In compliance with the Comprehensive Nuclear-Test-Ban-Treaty (CTBT) the International Monitoring System (IMS) was designed for detection and location of the clandestine Nuclear Tests (NT). Two auxiliary IMS seismic stations MRNI and EIL, deployed recently, were subjected to detectability, travel-time calibration and discrimination analysis. The study is based on the three recent 1998 underground nuclear explosions: one of India and two of Pakistan, which provided a ground-truth test of the existing IMS. These events, attaining magnitudes of 5.2, 4.8 and 4.6 correspondingly, were registered by many IMS and other seismic stations.The MRNI and EIL broadband (BB) stations are located in Israel at teleseismic distances (from the explosions) of 3600, 2800 and 2700km, respectively, where the signals from the tests are already weak. The Indian and the second Pakistan NT were not detected by the short-period Israel Seismic Network (ISN), using standard STA/LTA triggering. Therefore, for the chosen IMS stations we compare the STA/LTA response to the results of the more sensitive Murdock-Hutt (MH) and the Adaptive Statistically Optimal Detector (OD) that showed triggering for these three events. The second Pakistan NT signal arrived at the ISN and the IMS stations in the coda of a strong Afghanistan earthquake and was further disturbed by a preceding signal from a local earthquake. However, the NT signal was successfully extracted at EIL and MRNI stations using MH and OD procedures. For comparison we provide the signal analysis of the cooperating BB station JER, with considerably worse noise conditions than EIL and MRNI, and show that OD can detect events when the other algorithms fail. Using the most quiet EIL station, the most sensitive OD and different bandpass filters we tried in addition to detect the small Kazakh chemical 100-ton calibration explosion of 1998, with magnitude 3.7 at a distance approaching 4000km. The detector response curve showed uprising in the

  2. New fuel vault criticality analysis at Chinshan nuclear power station with new approaches to improve the storage flexibility

    International Nuclear Information System (INIS)

    Huang, P. H.

    2010-10-01

    The Chinshan new fuel vault (NFV) consists of 13 fuel storage racks, each rack may store 10 fuel assemblies. Prior to 2008, the NFV had never been used and the practice by the Taiwan Power Company (TPC) was to temporarily store the fuel assemblies in the shipping containers after received, until the inspection work was performed shortly before the outage, and then assemblies were loaded directly into the spent fuel pool (SFP). Starting from 2009, this practice has been revised since the new fuel contract would only supply a small amount of containers for storage, and the SFP would lose full-core-off load capability soon; therefore, use of NFV to store fuel assemblies following inspection becomes extremely crucial. The original Chinshan NFV criticality analysis was performed for the initial fuel design. Although many new fuel designs had been used (e.g., Atrium-10 reported in PBNC-14), no reanalysis had been performed because it was not anticipated that NFV would be used. Therefore, TPC requested the vendor to perform the analysis for Atrium-10. Originally, the vendor estimated that number of assemblies allowed to be stored would be limited severely to about 60. To enhance storage flexibility, Tpc proposed some new approaches: 1) All assemblies are assumed in vendor's standard method to contain a single limiting lattice for entire fuel length, it is suggested that axially zoned limiting lattices be selected based on characteristics of reloads to be delivered, and this significantly improves flexibility. 2) The maximum k-effective equation used by vendor was corrected (manufacturing tolerances were conservatively mistreated). Also, the vendor typically used 0.95 k-effective as the criterion, it is suggested that NUREG-0800 requirement (≤0.98 for optimum moderation conditions) be applied. After several iterations, all the 130 locations are allowed to store fuel. The analysis report has been approved by the authority in June 2008. (Author)

  3. New fuel vault criticality analysis at Chinshan nuclear power station with new approaches to improve the storage flexibility

    Energy Technology Data Exchange (ETDEWEB)

    Huang, P. H., E-mail: u808966@taipower.com.t [Taiwan Power Company, Department of Nuclear Generation, 242 Roosevelt Rd., Sec. 3, Taipei, Taiwan (China)

    2010-10-15

    The Chinshan new fuel vault (NFV) consists of 13 fuel storage racks, each rack may store 10 fuel assemblies. Prior to 2008, the NFV had never been used and the practice by the Taiwan Power Company (TPC) was to temporarily store the fuel assemblies in the shipping containers after received, until the inspection work was performed shortly before the outage, and then assemblies were loaded directly into the spent fuel pool (SFP). Starting from 2009, this practice has been revised since the new fuel contract would only supply a small amount of containers for storage, and the SFP would lose full-core-off load capability soon; therefore, use of NFV to store fuel assemblies following inspection becomes extremely crucial. The original Chinshan NFV criticality analysis was performed for the initial fuel design. Although many new fuel designs had been used (e.g., Atrium-10 reported in PBNC-14), no reanalysis had been performed because it was not anticipated that NFV would be used. Therefore, TPC requested the vendor to perform the analysis for Atrium-10. Originally, the vendor estimated that number of assemblies allowed to be stored would be limited severely to about 60. To enhance storage flexibility, Tpc proposed some new approaches: 1) All assemblies are assumed in vendor's standard method to contain a single limiting lattice for entire fuel length, it is suggested that axially zoned limiting lattices be selected based on characteristics of reloads to be delivered, and this significantly improves flexibility. 2) The maximum k-effective equation used by vendor was corrected (manufacturing tolerances were conservatively mistreated). Also, the vendor typically used 0.95 k-effective as the criterion, it is suggested that NUREG-0800 requirement ({<=}0.98 for optimum moderation conditions) be applied. After several iterations, all the 130 locations are allowed to store fuel. The analysis report has been approved by the authority in June 2008. (Author)

  4. Flexible Local Load Controller for Fast ElectricVehicle Charging Station Supplemented with Flywheel Energy Storage System

    DEFF Research Database (Denmark)

    Dragicevic, Tomislav; SUN, BO; Schaltz, Erik

    2014-01-01

    Electric vehicle charging infrastructure is hitting the stage where its impact on performance and operation of power systems becomes more and more pronounced. Aiming to utilize the existing power distribution infrastructure and delay its expansion, an approach that includes installation of dedica......Electric vehicle charging infrastructure is hitting the stage where its impact on performance and operation of power systems becomes more and more pronounced. Aiming to utilize the existing power distribution infrastructure and delay its expansion, an approach that includes installation...... of dedicated flywheel energy storage system (FESS) within the charging station and compensating some of the adverse effects of high power charging is explored in this paper. Although sharing some similarities with vehicle to grid (V2G) technology, the principal advantage of this strategy is the fact that many...

  5. A Low Heat Inleak Cryogenic Station for Testing HTS Current Leads for the Large Hadron Collider

    CERN Document Server

    Ballarino, A; Gomes, P; Métral, L; Serio, L; Suraci, A

    1999-01-01

    The LHC will be equipped with about 8000 superconducting magnets of all types. The total current to be transported into the cryogenic enclosure amounts to some 3360 kA. In order to reduce the heat load into the liquid helium, CERN intends to use High Temperature Superconducting (HTS) material for leads having current ratings up to 13 kA. The resistive part of the leads is cooled by forced flow of gaseous helium between 20 K and 300 K. The HTS part of the lead is immersed in a 4.5 K liquid helium bath, operates in self cooling conditions and is hydraulically separated from the resistive part. A cryogenic test station has been designed and built in order to assess the thermal and electrical performances of 13 kA prototype current leads. We report on the design, commissioning and operation of the cryogenic test station and illustrate its performance by typical test results of HTS current leads.

  6. Indigenous unit for bending and twisting tests of ultra-thin films on a flexible substrate

    Science.gov (United States)

    D'souza, Slavia Deeksha; Hazarika, Pratim; Prakasarao, Ch Surya; Kovendhan, M.; Kumar, R. Arockia; Joseph, D. Paul

    2018-04-01

    An indigenous unit is designed to test the stability of thin films deposited on to a flexible substrate by inducing a required number of bending and twisting under specific conditions. The unit is designed using aluminum and automated by sending pulse width modulated signals to servo motors using ATmega328 microcontroller. We have tested the unit by imparting stress on to a commercial ITO film deposited on a PET substrate. After a definite number of bending and twisting cycles, the electrical and surface properties are studied and the results are discussed.

  7. Finite element analysis of an underground protective test station subjected to severe ground motion

    International Nuclear Information System (INIS)

    Burchett, S.N.; Milloy, J.A.; Von Riesemann, W.A.

    1974-01-01

    A recoverable test station, to be used at a location very close to the detonation point of an underground nuclear test, was designed and tested. The design required that the station survive the very severe free-field stress and that the acceleration of the station be limited to a tolerable level. The predicted magnitude and time history of the free-field stress and acceleration indicated that the volcanic tuff medium and the materials of the proposed structure would exhibit nonlinear behavior, so that a transient dynamic analysis of a composite type structure involving nonlinear materials and large deformations was necessary. Parameter studies using a linear elastic dynamic finite element technique were first done to gain an understanding of the effect of the material properties and to study the response of various configurations of the protective structure to the transient loading. Based upon the results of these parameter studies and upon fielding considerations, a tentative design was chosen. This design was then evaluated using a newly developed finite element computer program. The results obtained from this analysis are compared to the field test results. (U.S.)

  8. Hot Cell Installation and Demonstration of the Severe Accident Test Station

    Energy Technology Data Exchange (ETDEWEB)

    Linton, Kory D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Burns, Zachary M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Terrani, Kurt A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Yan, Yong [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-08-01

    A Severe Accident Test Station (SATS) capable of examining the oxidation kinetics and accident response of irradiated fuel and cladding materials for design basis accident (DBA) and beyond design basis accident (BDBA) scenarios has been successfully installed and demonstrated in the Irradiated Fuels Examination Laboratory (IFEL), a hot cell facility at Oak Ridge National Laboratory. The two test station modules provide various temperature profiles, steam, and the thermal shock conditions necessary for integral loss of coolant accident (LOCA) testing, defueled oxidation quench testing and high temperature BDBA testing. The installation of the SATS system restores the domestic capability to examine postulated and extended LOCA conditions on spent fuel and cladding and provides a platform for evaluation of advanced fuel and accident tolerant fuel (ATF) cladding concepts. This document reports on the successful in-cell demonstration testing of unirradiated Zircaloy-4. It also contains descriptions of the integral test facility capabilities, installation activities, and out-of-cell benchmark testing to calibrate and optimize the system.

  9. Start-up test of Fukushima Daini Nuclear Power Station Unit No.3

    International Nuclear Information System (INIS)

    Inomata, Toshio; Umezu, Akira; Kajikawa, Makoto; Koibuchi, Hiroshi; Netsu, Nobuhiko.

    1986-01-01

    In Unit 3 of the Fukushima Nuclear Power Station II (daini), a BWR power plant of output 1,100 MW, commercial operation was started in June 1985. Its start-up test was finished successfully in about nine months. That is, new equipments introduced were demonstration tested. Though the items of testing are increased, the start-up test took short time, resulting in construction period only 54.7 months of the Unit 3, the shortest in the world. During the test, there was no scramming other than the planned. Described are the following: an outline of the Unit 3, the items of its improvement and standardization, including the new equipments, preparations for the start-up test, the start-up test and its evaluation. (Mori, K.)

  10. An environmental testing facility for Space Station Freedom power management and distribution hardware

    Science.gov (United States)

    Jackola, Arthur S.; Hartjen, Gary L.

    1992-01-01

    The plans for a new test facility, including new environmental test systems, which are presently under construction, and the major environmental Test Support Equipment (TSE) used therein are addressed. This all-new Rocketdyne facility will perform space simulation environmental tests on Power Management and Distribution (PMAD) hardware to Space Station Freedom (SSF) at the Engineering Model, Qualification Model, and Flight Model levels of fidelity. Testing will include Random Vibration in three axes - Thermal Vacuum, Thermal Cycling and Thermal Burn-in - as well as numerous electrical functional tests. The facility is designed to support a relatively high throughput of hardware under test, while maintaining the high standards required for a man-rated space program.

  11. Design, fabrication and performance tests for a polymer-based flexible flat heat pipe

    International Nuclear Information System (INIS)

    Hsieh, Shou-Shing; Yang, Ya-Ru

    2013-01-01

    Highlights: ► Fabrication of a polymer-based flexible flat heat pipe. ► Bending angle of 15° will lead to a better thermal performance of the system. ► Powers higher than 12.67 W can be transferred/delivered. - Abstract: In this paper, we report on the novel design, fabrication and performance tests for a polymer-based flexible flat heat pipe (FHP) with a bending angle in the range of 15–90°. Each heat pipe is 4 mm thick, 20 mm wide and 80 mm long, with two layers of No. 250 copper mesh as the wicking material. A copper/silicone rubber hybrid structure is designed and fabricated to achieve the flexibility of the heat pipe. Thermal characteristics are measured and studied for de-ionized water under different working conditions. Experimental results reveal that a bending angle of 15° on the vertical plane has a better thermal performance than those of heat pipes with/without bending. In addition, a higher power of 12.67 W can be transferred/delivered

  12. Field testing of behavioral barriers for cooling water intake structures -test site 1 - Pickering Nuclear Generating Station

    International Nuclear Information System (INIS)

    Patrick, P.H.; McKinley, R.S.; Micheletti, W.C.

    1988-01-01

    A multi-year research program was developed by the Electric Power Research Institute to evaluate the effectiveness of selected behavioral systems for fish exclusion at sites representative of different aquatic environments. The first test site was the Pickering Nuclear Generating Station (NGS) located on Lake Ontario which represented the Great Lakes environment. A single pneumatic popper, a low frequency, high amplitude sound deterrent, was found to effectively exclude adult alewife, the principal species impinged at Pickering NGS. An air bubble curtain, used either alone or combined with strobe lights, was not a consistent deterrent. Effectiveness of air bubbles was only enhanced when used in association with a popper. Strobe lights were the least effective of the three devices tested. Operation of all three devices together did not surpass the effectiveness of the popper when used alone. Sound deterrents show promise for fish exclusion at generating stations located on the Great Lakes

  13. Preliminary results for HIP bonding Ta to W targets for the materials test station

    Energy Technology Data Exchange (ETDEWEB)

    Dombrowski, David E [Los Alamos National Laboratory; Maloy, Stuart A [Los Alamos National Laboratory

    2009-01-01

    Tungsten targets for the Materials Test Station (MTS) were clad with thin tantalum cover plates and a tantalum frame using hot isostatic pressing (HIP). A preliminary HIP parameter study showed good bonding and intimate mechanical contact for Ta cover plate thicknesses of 0.25 mm (0.010 inch) and 0.38 mm (0.015 inch). HIP temperatures of full HIP runs were 1500 C (2732 F). HIP pressure was 203 MPa (30 ksi).

  14. Operation of the Hoenoe wind power test station. Final report; Drift av Hoenoe provstation. Slutrapport

    Energy Technology Data Exchange (ETDEWEB)

    Ellsen, Magnus; Carlson, Ola [Chalmers Univ. of Tech., Goeteborg (Sweden). Dept. of Electric Power Engineering

    2002-04-01

    This project has made it possible to have autonomous operation of the Chalmers experimental wind turbine. By development of the optimal speed and stall control the energy production is good. The test station has been put in good order and is well prepared to been shown to visitors. The proposed research will focus on series capacitors for increasing the power output and better control of the damping valves to reduce vibrations.

  15. THE UNMANNED MISSION AVIONICS TEST HELICIOPTER – A FLEXIBLE AND VERSATILE VTOL-UAS EXPERIMENTAL SYSTEM

    Directory of Open Access Journals (Sweden)

    Dr. H.-W. Schulz

    2012-09-01

    Full Text Available civil customers. These applications cover a wide spectrum from R&D programs for the military customer to special services for the civil customer. This paper focuses on the technical conversion of a commercially available VTOL-UAS to ESG's Unmanned Mission Avionics Test Helicopter (UMAT, its concept and operational capabilities. At the end of the paper, the current integration of a radar sensor is described as an example of the UMATs flexibility. The radar sensor is developed by the Fraunhofer Institute for High Frequency Physics and Radar Techniques (FHR. It is integrated by ESG together with the industrial partner SWISS UAV.

  16. Overview of the 6 Meter HIAD Inflatable Structure and Flexible TPS Static Load Test Series

    Science.gov (United States)

    Swanson, Greg; Kazemba, Cole; Johnson, Keith; Calomino, Anthony; Hughes, Steve; Cassell, Alan; Cheatwood, Neil

    2014-01-01

    To support NASAs long term goal of landing humans on Mars, technologies which enable the landing of heavy payloads are being developed. Current entry, decent, and landing technologies are not practical for this class of payloads due to geometric constraints dictated by current launch vehicle fairing limitations. Therefore, past and present technologies are now being explored to provide a mass and volume efficient solution to atmospheric entry, including Hypersonic Inflatable Aerodynamic Decelerators (HIADs). At the beginning of 2014, a 6m HIAD inflatable structure with an integrated flexible thermal protection system (TPS) was subjected to a static load test series to verify the designs structural performance. The 6m HIAD structure was constructed in a stacked toroid configuration using nine inflatable torus segments composed of fiber reinforced thin films, which were joined together using adhesives and high strength textile woven structural straps to help distribute the loads throughout the inflatable structure. The 6m flexible TPS was constructed using multiple layers of high performance materials to protect the inflatable structure from heat loads that would be seen during atmospheric entry. To perform the static load test series, a custom test fixture was constructed. The fixture consisted of a structural tub rim with enough height to allow for displacement of the inflatable structure as loads were applied. The bottom of the tub rim had an airtight seal with the floor. The centerbody of the inflatable structure was attached to a pedestal mount as seen in Figure 1. Using an impermeable membrane seal draped over the test article, partial vacuum was pulled beneath the HIAD, resulting in a uniform static pressure load applied to the outer surface. During the test series an extensive amount of instrumentation was used to provide many data sets including: deformed shape, shoulder deflection, strap loads, cord loads, inflation pressures, and applied static load

  17. Optimal test intervals for shutdown systems for the Cernavoda nuclear power station

    International Nuclear Information System (INIS)

    Negut, Gh.; Laslau, F.

    1993-01-01

    Cernavoda nuclear power station required a complete PSA study. As a part of this study, an important goal to enhance the effectiveness of the plant operation is to establish optimal test intervals for the important engineering safety systems. The paper presents, briefly, the current methods to optimize the test intervals. For this reason it was used Vesely methods to establish optimal test intervals and Frantic code to survey the influence of the test intervals on system availability. The applications were done on the Shutdown System no. 1, a shutdown system provided whit solid rods and on Shutdown System no. 2 provided with injecting poison. The shutdown systems receive nine total independent scram signals that dictate the test interval. Fault trees for the both safety systems were developed. For the fault tree solutions an original code developed in our Institute was used. The results, intended to be implemented in the technical specifications for test and operation of Cernavoda NPS are presented

  18. Texas flexible pavements and overlays : year 1 report, test sections, data collection, analyses, and data storage system.

    Science.gov (United States)

    2012-06-01

    This five-year project was initiated to collect materials and pavement performance data on a minimum of 100 highway test sections around the State of Texas, incorporating both flexible pavements and overlays. Besides being used to calibrate and valid...

  19. Preliminary Test Results of Heshe Hydrogeological Experimental Well Station in Taiwan

    Science.gov (United States)

    Chuang, P.; Liu, C.; Lin, M.; Chan, W.; Lee, T.; Chia, Y.; Teng, M.; Liu, C.

    2013-12-01

    Safe disposal of radioactive waste is a critical issue for the development of nuclear energy. The design of final disposal system is based on the concept of multiple barriers which integrate the natural barriers and engineering barriers for long-term isolation of radioactive wastes. As groundwater is the major medium that can transport radionuclides to our living environment, it is essential to characterize groundwater flow at the disposal site. Taiwan is located at the boundary between the Eurasian plate and the Philippine Sea plate. Geologic formations are often fractured due to tectonic compression and extension. In this study, a well station for the research and development of hydrogeological techniques was established at the Experimental Forest of the National Taiwan University in central Taiwan. There are 10 testing wells, ranging in depth from 25 m to 100 m, at the station. The bedrock beneath the regolith is highly fractured mudstone. As fracture is the preferential pathway of the groundwater flow, the focus of in-situ tests is to investigate the location of permeable fractures and the connection of permeable fractures. Several field tests have been conducted, including geophysical logging, heat-pulse flowmeter, hydraulic test, tracer test and double packer test, for the development of advanced technologies to detect the preferential groundwater flow in fractured rocks.

  20. The Space Station Module Power Management and Distribution automation test bed

    Science.gov (United States)

    Lollar, Louis F.

    1991-01-01

    The Space Station Module Power Management And Distribution (SSM/PMAD) automation test bed project was begun at NASA/Marshall Space Flight Center (MSFC) in the mid-1980s to develop an autonomous, user-supportive power management and distribution test bed simulating the Space Station Freedom Hab/Lab modules. As the test bed has matured, many new technologies and projects have been added. The author focuses on three primary areas. The first area is the overall accomplishments of the test bed itself. These include a much-improved user interface, a more efficient expert system scheduler, improved communication among the three expert systems, and initial work on adding intermediate levels of autonomy. The second area is the addition of a more realistic power source to the SSM/PMAD test bed; this project is called the Large Autonomous Spacecraft Electrical Power System (LASEPS). The third area is the completion of a virtual link between the SSM/PMAD test bed at MSFC and the Autonomous Power Expert at Lewis Research Center.

  1. Multi-Use seismic stations offer strong deterrent to clandestine nuclear weapons testing

    Science.gov (United States)

    Hennet, C. B.; Van der Vink, G. E.; Richards, P. G.; Adushkin, V. V.; Kopnichev, Y. F.; Geary, R.

    As the United States and other nations push for the signing of a Comprehensive Test Ban Treaty, representatives are meeting in Geneva this year to develop an International Seismic Monitoring System to verify compliance with the treaty's restrictions. In addition to the official monitoring system, regional networks developed for earthquake studies and basic research can provide a strong deterrent against clandestine testing. The recent release of information by the U.S. Department of Energy (DoE) on previously unannounced nuclear tests provides an opportunity to assess the ability of multi-use seismic networks to help monitor nuclear testing across the globe.Here we look at the extent to which the formerly unannounced tests were recorded and identified on the basis of publicly available seismographic data recorded by five seismic networks. The data were recorded by networks in southern Nevada and northern California at stations less than 1500 km from the Nevada Test Site (NTS), and two networks in the former Soviet Union at stations farther than 1500 km from the NTS.

  2. LHCb: Test Station for the LHCb Muon Front-End Electronic

    CERN Multimedia

    Polycarpo, E

    2005-01-01

    The LHCb Muon Group has developed the CMOS ASIC CARIOCA to readout its Multiwire Proportional Chambers (MWPC) and GEM detectors, using a rad-hard IBM 0.25um process. Each ASIC holds 8 identical current-mode ASDB channels with individual input thresholds. The Muon detector contains around 120000 physical channels, requiring production of 20000 front-end chips, roughly. CARIOCA has been developed to process MWPC cathode and anode signals and two different versions have been implemented to overcome the requirement of MWP and GEM chambers operation. The test station has been devised to accomplish bipolar tests and to measure characteristics of both CARIOCA versions.

  3. Local control station for development, testing and maintenance of mirror fusion facility subsystem controls

    International Nuclear Information System (INIS)

    Ables, E.; Kelly, M.F.

    1985-01-01

    A Local Control Station (LCS) was designed and built to provide a simplified ad easily configurable means of controlling any Mirror Fusion Test Facility (MFTF-B) subsystem for the purpose of development, testing and maintenance of the subsystem. All MFTF-B Subsystems incorporate at least one Local Control Computer (LCC) that is connected to and accepts high level commands from one of the Supervisory Control and Diagnostic System (SCDS) computers. The LCS connects directly to the LCC in place of SCDS. The LCS communicates with the subsystem hardware using the same SCDS commands that the local control computer recognizes and as such requires no special configuration of the LCC

  4. Simulated earthquake testing of naturally aged C and D LCU-13 station battery cells

    International Nuclear Information System (INIS)

    Tulk, J.D.; Black, D.A.; Janis, W.J.; Royce, C.J.

    1985-03-01

    A sample of 10-year-old lead-acid storage batteries from the North Anna Nuclear Power Station (Virginia Electric and Power Company) were tested on a shaker table. Seven cells were subjected to simulated earthquakes with a ZPA of approximately 1.5 g. All seven delivered uninterrupted power during the shaker tests and were able to pass a post-seismic capacity test. Two cells were shaken to higher intensities (ZPA approximately equal to 2 g). These cells provided uninterrupted power during the shaker tests, but had post-seismic capacities that were below the required level for Class1E battery cells. After the tests, several cells were disassembled and examined. Internal components were in good condition with limited oxidization and plate cracking

  5. Manufacturing and testing flexible microfluidic devices with optical and electrical detection mechanisms

    Science.gov (United States)

    Ivan, Marius G.; Vivet, Frédéric; Meinders, Erwin R.

    2010-06-01

    Flexible microfluidic devices made of poly(dimethylsiloxane) (PDMS) were manufactured by soft lithography, and tested in detection of ionic species using optical absorption spectroscopy and electrical measurements. PDMS was chosen due to its flexibility and ease of surface modification by exposure to plasma and UV treatment, its transparency in UV-Vis regions of the light spectrum, and biocompatibility. The dual-detection mechanism allows the user more freedom in choosing the detection tool, and a functional device was successfully tested. Optical lithography was employed for manufacturing templates, which were subsequently used for imprinting liquid PDMS by thermal curing. Gold electrodes having various widths and distances among them were patterned with optical lithography on the top part which sealed the microchannels, and the devices were employed for detection of ionic species in aqueous salt solutions as well as micro-electrolysis cells. Due to the transparency of PDMS in UV-Vis the microfluidics were also used as photoreactors, and the in-situ formed charged species were monitored by applying a voltage between electrodes. Upon addition of a colorimetric pH sensor, acid was detected with absorption spectroscopy.

  6. Design, Development and Pre-Flight Testing of the Communications, Navigation, and Networking Reconfigurable Testbed (Connect) to Investigate Software Defined Radio Architecture on the International Space Station

    Science.gov (United States)

    Over, Ann P.; Barrett, Michael J.; Reinhart, Richard C.; Free, James M.; Cikanek, Harry A., III

    2011-01-01

    The Communication Navigation and Networking Reconfigurable Testbed (CoNNeCT) is a NASA-sponsored mission, which will investigate the usage of Software Defined Radios (SDRs) as a multi-function communication system for space missions. A softwaredefined radio system is a communication system in which typical components of the system (e.g., modulators) are incorporated into software. The software-defined capability allows flexibility and experimentation in different modulation, coding and other parameters to understand their effects on performance. This flexibility builds inherent redundancy and flexibility into the system for improved operational efficiency, real-time changes to space missions and enhanced reliability/redundancy. The CoNNeCT Project is a collaboration between industrial radio providers and NASA. The industrial radio providers are providing the SDRs and NASA is designing, building and testing the entire flight system. The flight system will be integrated on the Express Logistics Carrier (ELC) on the International Space Station (ISS) after launch on the H-IIB Transfer Vehicle in 2012. This paper provides an overview of the technology research objectives, payload description, design challenges and pre-flight testing results.

  7. Tests used in Project Level Flexible Pavement rehabilitation studies. Research report

    Energy Technology Data Exchange (ETDEWEB)

    Jordaan, G.J.

    1986-09-01

    This paper gives guidelines for the use of tests and their interpretation in the various phases of flexible pavement rehabilitation design as currently adopted in South Africa. The procedure advocated involves a systematic approach to the investigation, evaluation and analysis of the existing pavement. In the recommended procedure, use is made of past pavement behavior and pavement condition, thereby making possible an early assessment of additional information needed. Much emphasis is placed on the optimum utilization of available resources in designing the best applicable remedy to an existing problem. The paper gives a comprehensive list of criteria for parameters measured on a routine basis on South African roads. The procedure suggested allows the condition of pavements to be expressed in comparable terms. Information on the development and use of some new and specialized tests which are used in pavement rehabilitation is given in an appendix.

  8. Start-up tests of Kashiwazakikariwa Nuclear Power Station Unit No.2 and No.5

    International Nuclear Information System (INIS)

    Fueki, Kensuke; Aoki, Shiro; Tanaka, Yasuhisa; Yahagi, Kimitoshi

    1991-01-01

    The Kashiwazakikariwa Nuclear Power Station Units No.5 and No.2 started commercial operation on April 10 and September 28 of 1990 respectively. As the result of the application of the First and Second LWR Improvement and Standardization Program, the plants were designed aiming at improvement of reliability, operation, and maintenance while maintaining safety. Construction of the plants took 6.5 to 7 years for completion, during which period the last 10 months were spent for the start up tests program. Start up tests were carried out under deliberate management to assure that the plants can operate safely and steadily at the prescribed operating points, and the schedules and tests item modifications adopted in Unit No.2 and No.5 were verified under the start up tests program. (author)

  9. Forced vibration tests on the reactor building of a nuclear power station, 1

    International Nuclear Information System (INIS)

    Takeda, Toshikazu; Tsunoda, Tomohiko; Wakamatsu, Kunio; Kaneko, Masataka; Nakamura, Mitsuru; Kunoh, Toshio; Murahashi, Hisahiro

    1988-01-01

    Tsuruga Unit No.2 Nuclear Power Station of the Japan Atomic Power Company is the first PWR-type 4-loop plant constructed in Japan with a prestressed concrete containment vessel (PCCV). This report describes forced vibration tests carried out on the reactor building of this plant. The following were obtained as results: (1) The results of the forced vibration tests corresponded well on the whole with design values. (2) The vibration characteristics of the PCCV observed in the tests after prestressing are no different from the ones before prestressing. This shows that the vibration properties of the PCCV are practically independent of prestressing loads. (3) A seismic response analysis of the design basis earthquake was made on the design model reflecting the test results. The seismic safety of the plant was confirmed by this analysis. (author)

  10. Materials for the field test - students' attitudes to nuclear power stations

    International Nuclear Information System (INIS)

    Hoffmann, L.; Kattmann, U.; Lucht, H.; Spada, H.

    1975-01-01

    This working paper contains all the materials developed for and used in the field test of 'Student Attitudes toward Atomic Power Stations'. This research is a component of a larger project called 'Attitudes and Attitudes Change with Regard to Problems of Energy Supply and their Consequences for our Environment'. A central aim of this project is the development of instrumental strategies enabling the student to build up in this field a critically reflective and active behavior and attitudes based on sound problem consciousness. These instrumental strategies are derived from theories of social, learning and environmental psychology. A concrete result of these efforts are the materials of the field test mentioned above. They include: a) The draft of an instructional unit 'Atomic Power Stations - Prosperity or Disaster' with - a booklet on the subject matter for students and teachers - a paper on the contents of the instructional unit and their sequence - information for the students concerning the aims of the investigation - working materials for the students - reading materials for the teachers informing them about the proposed instructional strategies based on the psychological theories: (1) model-learning and the structuring of knowledge, (2) how to activate and motivate students, (3) the stabilization of attitudes and (4) small group work. b) Instruments for testing and observation. These instruments were used within a criterion-oriented evaluation and for a test of the effects of the different proposed items used in the instruction. (orig./HP) [de

  11. Standard test method for determination of surface lubrication on flexible webs

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    1999-01-01

    1.1 This test method has been used since 1988 as an ANSI/ISO standard test for determination of lubrication on processed photographic films. Its purpose was to determine the presence of process-surviving lubricants on photographic films. It is the purpose of this test method to expand the applicability of this test method to other flexible webs that may need lubrication for suitable performance. This test measures the breakaway (static) coefficient of friction of a metal rider on the web by the inclined plane method. The objectives of the test is to determine if a web surface has a lubricant present or not. It is not intended to assign a friction coefficient to a material. It is not intended to rank lubricants. 1.2 The values stated in SI units are to be regarded as standard. No other units of measurement are included in this standard. 1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish ...

  12. Test and evaluation of load converter topologies used in the Space Station Freedom power management and distribution dc test bed

    Science.gov (United States)

    Lebron, Ramon C.; Oliver, Angela C.; Bodi, Robert F.

    1991-01-01

    Power components hardware in support of the Space Station freedom dc Electric Power System were tested. One type of breadboard hardware tested is the dc Load Converter Unit, which constitutes the power interface between the electric power system and the actual load. These units are dc to dc converters that provide the final system regulation before power is delivered to the load. Three load converters were tested: a series resonant converter, a series inductor switch-mode converter, and a switching full-bridge forward converter. The topology, operation principles, and test results are described, in general. A comparative analysis of the three units is given with respect to efficiency, regulation, short circuit behavior (protection), and transient characteristics.

  13. Free-free and fixed base modal survey tests of the Space Station Common Module Prototype

    Science.gov (United States)

    Driskill, T. C.; Anderson, J. B.; Coleman, A. D.

    1992-01-01

    This paper describes the testing aspects and the problems encountered during the free-free and fixed base modal surveys completed on the original Space Station Common Module Prototype (CMP). The CMP is a 40-ft long by 14.5-ft diameter 'waffle-grid' cylinder built by the Boeing Company and housed at the Marshall Space Flight Center (MSFC) near Huntsville, AL. The CMP modal survey tests were conducted at MSFC by the Dynamics Test Branch. The free-free modal survey tests (June '90 to Sept. '90) included interface verification tests (IFVT), often referred to as impedance measurements, mass-additive testing and linearity studies. The fixed base modal survey tests (Feb. '91 to April '91), including linearity studies, were conducted in a fixture designed to constrain the CMP in 7 total degrees-of-freedom at five trunnion interfaces (two primary, two secondary, and the keel). The fixture also incorporated an airbag off-load system designed to alleviate the non-linear effects of friction in the primary and secondary trunnion interfaces. Numerous test configurations were performed with the objective of providing a modal data base for evaluating the various testing methodologies to verify dynamic finite element models used for input to coupled load analysis.

  14. Space Station propulsion - Advanced development testing of the water electrolysis concept at MSFC

    Science.gov (United States)

    Jones, Lee W.; Bagdigian, Deborah R.

    1989-01-01

    The successful demonstration at Marshall Space Flight Center (MSFC) that the water electrolysis concept is sufficiently mature to warrant adopting it as the baseline propulsion design for Space Station Freedom is described. In particular, the test results demonstrated that oxygen/hydrogen thruster, using gaseous propellants, can deliver more than two million lbf-seconds of total impulse at mixture ratios of 3:1 to 8:1 without significant degradation. The results alao demonstrated succcessful end-to-end operation of an integrated water electrolysis propulsion system.

  15. International Space Station Bacteria Filter Element Post-Flight Testing and Service Life Prediction

    Science.gov (United States)

    Perry, J. L.; von Jouanne, R. G.; Turner, E. H.

    2003-01-01

    The International Space Station uses high efficiency particulate air (HEPA) filters to remove particulate matter from the cabin atmosphere. Known as Bacteria Filter Elements (BFEs), there are 13 elements deployed on board the ISS's U.S. Segment. The pre-flight service life prediction of 1 year for the BFEs is based upon performance engineering analysis of data collected during developmental testing that used a synthetic dust challenge. While this challenge is considered reasonable and conservative from a design perspective, an understanding of the actual filter loading is required to best manage the critical ISS Program resources. Thus testing was conducted on BFEs returned from the ISS to refine the service life prediction. Results from this testing and implications to ISS resource management are discussed. Recommendations for realizing significant savings to the ISS Program are presented.

  16. Test Station for Magnetization Measurements on Large Quantities of Superconducting Strands

    CERN Document Server

    Le Naour, S; Billan, J; Genest, J

    2001-01-01

    In the superconducting main magnets of the Large Hadron Collider (LHC), persistent currents in the superconductor determine the field quality at injection field. For this reason it is necessary to check the magnetization of the cable strands during their production. During four years, this requires measurements of the width of the strand magnetization hysteresis loop at 0.5 T, 1.9 K, at a rate of up to eight samples per day. This paper describes the design, construction and the first results of a magnetization test station built for this purpose. The samples are cooled in a cryostat, with a 2-m long elliptic tail. This tail is inserted in a normal conducting dipole magnet with a field between ± 1.5 T. Racetrack pick-up coils, integrated in the cryostat, detect the voltage due to flux change, which is then integrated numerically. The sample holder can contain eight strand samples, each 20 cm long. The test station operates in two modes: either the sample is fixed while the external field is changed, or the sa...

  17. PWR station blackout transient simulation in the INER integral system test facility

    International Nuclear Information System (INIS)

    Liu, T.J.; Lee, C.H.; Hong, W.T.; Chang, Y.H.

    2004-01-01

    Station blackout transient (or TMLB' scenario) in a pressurized water reactor (PWR) was simulated using the INER Integral System Test Facility (IIST) which is a 1/400 volumetrically-scaled reduce-height and reduce-pressure (RHRP) simulator of a Westinghouse three-loop PWR. Long-term thermal-hydraulic responses including the secondary boil-off and the subsequent primary saturation, pressurization and core uncovery were simulated based on the assumptions of no offsite and onsite power, feedwater and operator actions. The results indicate that two-phase discharge is the major depletion mode since it covers 81.3% of the total amount of the coolant inventory loss. The primary coolant inventory has experienced significant re-distribution during a station blackout transient. The decided parameter to avoid the core overheating is not the total amount of the coolant inventory remained in the primary core cooling system but only the part of coolant left in the pressure vessel. The sequence of significant events during transient for the IIST were also compared with those of the ROSA-IV large-scale test facility (LSTF), which is a 1/48 volumetrically-scaled full-height and full-pressure (FHFP) simulator of a PWR. The comparison indicates that the sequence and timing of these events during TMLB' transient studied in the RHRP IIST facility are generally consistent with those of the FHFP LSTF. (author)

  18. Controlled environmental radioiodine tests at the national reactor testing station. 1965 progress report

    Energy Technology Data Exchange (ETDEWEB)

    Adams, D.R.; Bunch, D.F.; Gammill, W.P.; Hawley, C.A. Jr.; Markee, E.H.; Tiernan, M.W.

    1966-02-01

    The CERT project consists of a series of planned releases of radioiodine over different vegetation and during various meteorological conditions, with the prime objective being to measure the relationships involved in the passage of radioiodine through the air-vegetation-cow-milk-human chain. The results of the first five tests in the series, which started in the spring of 1963 and is continuing, are reported. Each test was conducted under measured meteorological conditions and over prepared sampling and grazing courses. Two tests were made over open-range type vegetation, two over irrigated pastures, and one over snow-covered ground. Two tests were conducted under lapse conditions, two under inversion conditions, and one under neutral conditions. In each case, known quantities of elemental /sup 131/I/sub 2/ were released. Relationships determined included air-grass ratios (deposition velocities) which ranged from 0.1 to 1.0 cm/sec; effective half life of /sup 131/I on grass of 3.5 days and 5.5 days; the time of peak activity in milk at two days following a release; milk-grass ratio (C/1:C/g); total /sup 131/I secreted in milk by cows to that ingested by cows; adult human thyroid uptake fraction (inhalation); and based on a breathing rate of 20 m/sup 3//24 hours, the ratio between infinity mills ingestion dose and infinity inhalation dose for a single release was calculated. Data, descriptions of methods, and calculations are reported. Discussions of resuspension factors and particle sizes and behavior are also included.

  19. Testing various modes of installation for permanent broadband stations in open field environment

    Science.gov (United States)

    Vergne, Jérôme; Charade, Olivier; Arnold, Benoît; Louis-Xavier, Thierry

    2014-05-01

    In the framework of the RESIF (Réseau Sismologique et géodésique Français) project, we plan to install more than one hundred new permanent broadband stations in metropolitan France within the next 6 years. Whenever possible, the sensors will be installed in natural or artificial underground cavities that provide a stable thermal environment. However such places do not exist everywhere and we expect that about half the future stations will have to be set up in open fields. For such sites, we are thus looking for a standard model of hosting infrastructure for the sensors that would be easily replicated and would provide good noise level performances at long periods. Since early 2013, we have been operating a prototype station at Clévilliers, a small location in the sedimentary Beauce plain, where we test three kinds of buried seismic vaults and a down-hole installation. The cylindrical seismic vaults are 3m deep and 1m wide and only differ by the type of coupling between the casing and the concrete slab where we installed insulated Trillium T120PA seismometers. The down-hole installation consists in a 3m deep well hosting a Trillium Posthole seismometer. For reference, another sensor has been installed in a ~50cm deep hole, similarly to the way we test every new potential site. Here we compare the noise level in each infrastructure at different frequencies. We observe quite similar performances for the vertical component recorded in the different wells. Conversely, the noise levels on the horizontal components at periods greater than 10s vary by more than 20dB depending on the installation condition. The best results are obtained in the completely decoupled vault and for the down-hole setting, both showing performances comparable to some of our permanent stations installed in tunnels. The amplitude of the horizontal noise also appears to be highly correlated to wind speed recorded on site, even at long periods. The variable response of each vault to such

  20. Integrated water management system - Description and test results. [for Space Station waste water processing

    Science.gov (United States)

    Elden, N. C.; Winkler, H. E.; Price, D. F.; Reysa, R. P.

    1983-01-01

    Water recovery subsystems are being tested at the NASA Lyndon B. Johnson Space Center for Space Station use to process waste water generated from urine and wash water collection facilities. These subsystems are being integrated into a water management system that will incorporate wash water and urine processing through the use of hyperfiltration and vapor compression distillation subsystems. Other hardware in the water management system includes a whole body shower, a clothes washing facility, a urine collection and pretreatment unit, a recovered water post-treatment system, and a water quality monitor. This paper describes the integrated test configuration, pertinent performance data, and feasibility and design compatibility conclusions of the integrated water management system.

  1. Mobile work station concept for assembly of large space structures (zero gravity simulation tests)

    Science.gov (United States)

    Heard, W. L., Jr.; Bush, H. G.; Wallsom, R. E.; Jensen, J. K.

    1982-03-01

    The concept presented is intended to enhance astronaut assembly of truss structure that is either too large or complex to fold for efficient Shuttle delivery to orbit. The potential of augmented astronaut assembly is illustrated by applying the result of the tests to a barebones assembly of a truss structure. If this structure were assembled from the same nestable struts that were used in the Mobile Work Station assembly tests, the spacecraft would be 55 meters in diameter and consist of about 500 struts. The struts could be packaged in less than 1/2% of the Shuttle cargo bay volume and would take up approximately 3% of the mass lift capability. They could be assembled in approximately four hours. This assembly concept for erectable structures is not only feasible, but could be used to significant economic advantage by permitting the superior packaging feature of erectable structures to be exploited and thereby reduce expensive Shuttle delivery flights.

  2. Ultrasonic non-destructive testing of pieces of complex geometry with a flexible phased array transducer

    Science.gov (United States)

    Chatillon; Cattiaux; Serre; Roy

    2000-03-01

    Ultrasonic non-destructive testing of components of complex geometry in the nuclear industry faces several difficulties: sensitivity variations due to unmatched contact, inaccurate localization of defects due to variations of transducer orientation, and uncovered area of the component. To improve the performances of such testing and defect characterization, we propose a new concept of ultrasonic contact phased array transducer. The phased array transducer has a flexible radiating surface able to fit the actual surface of the piece to optimize the contact and thus the sensitivity of the test. To control the transmitted field, and therefore to improve the defect characterization, a delay law optimizing algorithm is developed. To assess the capability of such a transducer, the Champ-Sons model, developed at the French Atomic Energy Commission for predicting field radiated by arbitrary transducers into pieces, has to be extended to sources directly in contact with pieces of complex geometry. The good behavior of this new type of probe predicted by computations is experimentally validated with a jointed transducer positioned on pieces of various profiles.

  3. Flexible Electronics Research Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Flexible Electronics Research Facility designs, synthesizes, tests, and fabricates materials and devices compatible with flexible substrates for Army information...

  4. Test and Evaluation Station (TESt) - A Control System for the ALICE-HMPID Liquid Distribution Prototype

    CERN Document Server

    Maatta, E; CERN. Geneva; Swoboda, Detlef; Lecoeur, G

    1999-01-01

    The sub-detectors and systems in the ALICE experiment [1] are of various types. However, during physics runs, all devices necessary for the operation of the detector must be accessible and controllable through a common computer interface. Throughout all other periods each sub-detector requires maintenance, upgrading or test operation. To this end, an access independant of other sub-detectors must be guaranteed. These basic requirements impose a fair number of constraints on the architecture and components of the Detector Control System (DCS). The purpose of the TESt project consisted in the construction of a stand alone unit for a specific sub-system of an ALICE detector in order to gain first experience with commercial products for detector control. Although the control system includes only a small number of devices and is designed for a particular application, it covers nevertheless all layers of a complete system and can be extended or used in different applications. The control system prototype has been...

  5. Wage flexibility and local labour markets: a test on the homogeneity of the wage curve in Spain

    Directory of Open Access Journals (Sweden)

    Roberto Bande

    2012-01-01

    Full Text Available In this paper we analyse wage flexibility in Spain and its regional differences, departing from the estimation of wage curves. Using data from the Structure of Earnings Survey for 1995, 2002 and 2006, we estimate regional wage equations, relating the observed wage received by workers to a group of personal and job characteristics, as well as to the regional unemployment rate. This analysis allows us to test for the existence of regional differences in the degree of wage flexibility, which may have an important influence on the evolution of regional unemployment, given its impact on the ability of the local labour market to absorb negative shocks. Estimated results indicate that regions suffering from higher unemployment rates exhibit lower wage flexibility. Collective bargaining reforms should pursue greater wage flexibility, especially in regions with high rates of joblessness.

  6. Control room inleakage testing using tracer gases at Zion Generating station

    International Nuclear Information System (INIS)

    Lagus, P.L.; Brown, J.H.; Dubois, L.J.; Fleming, K.M.

    1993-01-01

    In order to assess the amount of air inleakage into the Control Room Envelope at Zion Generating Station (ZGS), a series of tracer gas tests using sulfur hexafluoride (SF 6 ) were performed on the Control Room ventilation system (PV system) and the Computer Room/Miscellaneous Area ventilation system (OV system) during February, 1991. Two redundant trains, denoted A and B comprise the PV system. Inleakage was measured for each train. An OV supply duct passes through the Control Room Envelope. Leakage from this duct into the Control Room would constitute air leakage into the Control room Envelope and hence any potential leakage had to be quantified. Each test attempted to measure the contribution (if any) of a particular section of PV return duct or OV supply duct to the total air inleakage into the Control Room. This paper reviews the tracer gas tests. Described here are the control room inleakage testing, HVAC equipment room duct inleakage, purge plenum inleakage, OV duct leakage into the control room envelope, vestibule PV return inleakage, TSC duct inleakage, and cable spreading room inleakage. Conclusions from the testing are presented. 5 refs., 4 figs., 7 tabs

  7. Performance Evaluation of the International Space Station Flow Boiling and Condensation Experiment (FBCE) Test Facility

    Science.gov (United States)

    Hasan, Mohammad; Balasubramaniam, R.; Nahra, Henry; Mackey, Jeff; Hall, Nancy; Frankenfield, Bruce; Harpster, George; May, Rochelle; Mudawar, Issam; Kharangate, Chirag R.; hide

    2016-01-01

    A ground-based experimental facility to perform flow boiling and condensation experiments is built in support of the development of the long duration Flow Boiling and Condensation Experiment (FBCE) destined for operation on board of the International Space Station (ISS) Fluid Integrated Rack (FIR). We performed tests with the condensation test module oriented horizontally and vertically. Using FC-72 as the test fluid and water as the cooling fluid, we evaluated the operational characteristics of the condensation module and generated ground based data encompassing the range of parameters of interest to the condensation experiment to be performed on the ISS. During this testing, we also evaluated the pressure drop profile across different components of the fluid subsystem, heater performance, on-orbit degassing subsystem, and the heat loss from different components. In this presentation, we discuss representative results of performance testing of the FBCE flow loop. These results will be used in the refinement of the flight system design and build-up of the FBCE which is scheduled for flight in 2019.

  8. Boars for breeding: A study of methods of evaluation used at testing stations

    Directory of Open Access Journals (Sweden)

    Elsi Ettala

    1973-01-01

    Full Text Available The phenotype testing of highly selected boars was studied. Two groups, each of 30 boars, were tested centrally at stations for growth rate and ultrasonically measured fat thickness. According to test points, made up of a combination of these two traits, the 5 best boars, 5 average boars and the 5 poorest boars where selected for progeny evaluation. In all 26 boars and 441 progeny were tested. The progeny evaluation showed that ultrasonic measurement of the fat thickness of the boars gave a very reliable estimate of the meatiness of their progeny. Those boars, as a group, giving the poorest carcass quality could be distinguished with statistical reliability from the other groups. The correlations between sires and progeny were significant for both daily gain (period 20—88 kg and feed efficiency. The importance of rate of growth and feed efficiency has been neglected in selection for breeding as the test points used for the selection of boars depended almost entirely on fat thickness. More than 30 % of both boars and progeny boars suffered from some form of difficulty in walking. 13 % of the boars were eliminated because of leg faults. Leg faults in progeny were mainly inherited or caused through injury. A phenotype evaluation of progeny boars accounts much more effectively for the variation in their carcass value than does a full barrow sib evaluation alone. For best results, a progeny boar phenotype evaluation should be combined with a full barrow sib evaluation.

  9. Test study on safety features of station blackout accident for nuclear main pump

    International Nuclear Information System (INIS)

    Liu Xiajie; Wang Dezhong; Zhang Jige; Liu Junsheng; Yang Zhe

    2009-01-01

    The theoretical and experimental studies of reactor coolant pump accidents encountered nation-wide and world-wide were described. To investigate the transient hydrodynamic performance of reactor coolant pump (RCP) during the period of rotational inertia in the station blackout accident, some theoretical and experimental studies were carried out, and the analysis of the test results was presented. The experiment parameters, conditions and test methods were introduced. The flow-rate, rotate speed and vibrations were analyzed emphatically. The quadruplicate polynomial curve equation was used to simulate the flow-rate,rotate speed along with time. The test results indicate that the flow-rate and rotator speed decrease rapidly at the very beginning of cut power and the test results accord with the regulation of safety standard. The vibrant displacement of bearing seat is intensified at the moment of lose power, but after a certain period rotor shaft libration changes. The test and analysis results help to understand the hydrodynamic performance of nuclear primary pump under lost of power accident, and provide the basic reference for safety evaluation. (authors)

  10. IEEE standard criteria for type tests of class 1E modules used in nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1977-01-01

    The Institute of Electrical and Electronics Engineers has generated this document to provide direction for type testing Class 1E modules and obtaining specific type test data. It supplements IEEE Std 323-1974, Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations, which describes the basic requirements for Class 1E equipment qualification. Adherence to this document alone may not suffice for assuring public health and safety because it is the integrated performance of the structures, the fluid systems, the electrical systems, the instrumentation systems of the station, and in particular, the plant protection system of which these modules are a part that prevents accidents or limits the consequences of accidents. Each applicant to the Nuclear Regulatory Commission for a license to operate a nuclear power generating station has the responsibility to assure himself and others that this document, if used, is pertinent to his application and that the integrated performance of his station is adequate

  11. The network architecture and site test of DCIS in Lungmen nuclear power station

    International Nuclear Information System (INIS)

    Lee, C. K.

    2006-01-01

    The Lungmen Nuclear Power Station (LMNPS) is located in North-Eastern Seashore of Taiwan. LMNPP has two units. Each unit generates 1350 Megawatts. It is the first ABWR Plant in Taiwan and is under-construction now. Due to contractual arrangement, there are seven large I and C suppliers/designers, which are GE NUMAC, DRS, Invensys, GEIS, Hitachi, MHI, and Stone and Webster company. The Distributed Control and Information System (DCIS) in Lungmen are fully integrated with the state-of-the-art computer and network technology. General Electric is the leading designer for integration of DCIS. This paper presents Network Architecture and the Site Test of DCIS. The network architectures are follows. GE NUMAC System adopts the point to point architecture, DRS System adopts Ring type architecture with SCRAMNET protocol, Inevnsys system adopts IGiga Byte Backbone mesh network with Rapid Spanning Tree Protocol, GEIS adopts Ethernet network with EGD protocol, Hitachi adopts ring type network with proprietary protocol. MHI adopt Ethernet network with UDP. The data-links are used for connection between different suppliers. The DCIS architecture supports the plant automation, the alarm prioritization and alarm suppression, and uniform MMI screen for entire plant. The Test Program regarding the integration of different network architectures and Initial DCIS architecture Setup for 161KV Energization will be discussed. Test tool for improving site test schedule, and lessons learned from FAT will be discussed too. And conclusions are at the end of this paper. (authors)

  12. The network architecture and site test of DCIS in Lungmen nuclear power station

    Energy Technology Data Exchange (ETDEWEB)

    Lee, C. K. [Instrument and Control Section, Lungmen Nuclear Power Station, Taiwan Power Company, Taipei County Taiwan (China)

    2006-07-01

    The Lungmen Nuclear Power Station (LMNPS) is located in North-Eastern Seashore of Taiwan. LMNPP has two units. Each unit generates 1350 Megawatts. It is the first ABWR Plant in Taiwan and is under-construction now. Due to contractual arrangement, there are seven large I and C suppliers/designers, which are GE NUMAC, DRS, Invensys, GEIS, Hitachi, MHI, and Stone and Webster company. The Distributed Control and Information System (DCIS) in Lungmen are fully integrated with the state-of-the-art computer and network technology. General Electric is the leading designer for integration of DCIS. This paper presents Network Architecture and the Site Test of DCIS. The network architectures are follows. GE NUMAC System adopts the point to point architecture, DRS System adopts Ring type architecture with SCRAMNET protocol, Inevnsys system adopts IGiga Byte Backbone mesh network with Rapid Spanning Tree Protocol, GEIS adopts Ethernet network with EGD protocol, Hitachi adopts ring type network with proprietary protocol. MHI adopt Ethernet network with UDP. The data-links are used for connection between different suppliers. The DCIS architecture supports the plant automation, the alarm prioritization and alarm suppression, and uniform MMI screen for entire plant. The Test Program regarding the integration of different network architectures and Initial DCIS architecture Setup for 161KV Energization will be discussed. Test tool for improving site test schedule, and lessons learned from FAT will be discussed too. And conclusions are at the end of this paper. (authors)

  13. Characterisation of a pneumatic muscle test station with two dynamic plants in cascade.

    Science.gov (United States)

    Serres, J L; Reynolds, D B; Phillips, C A; Rogers, D B; Repperger, D W

    2010-02-01

    Pneumatic muscle actuators (PMAs) offer significant advantages over more traditional actuators, which make them prime candidates in rehabilitation devices. A dynamic test station (DTS) is modified to demonstrate the use of a PMA for this application. The DTS includes two dynamic systems: a PMA and a DC servomotor. An overall transfer function was developed utilising characterisation data for the PMA and DC servomotor. A Tustin (bilinear) transform was performed on the overall transfer function to obtain a discrete time system. Model parameters were optimised and used to generate input voltage profiles that achieve isokinetic (constant velocity) task specifications. Percent root mean square error values (PRMSE) between the actual and ideal profiles were used to evaluate the accuracy of this method in achieving isokinetic displacement. For PMA pressures (in kPa) of 150, 350 and 550 PRMSE were 7.80, 5.40 and 2.76, respectively.

  14. SiPM application for a detector for UHE neutrinos tested at Sphinx station

    International Nuclear Information System (INIS)

    Iori, M.; Atakisi, I.O.; Chiodi, G.; Denizli, H.; Ferrarotto, F.; Kaya, M.; Yilmaz, A.; Recchia, L.; Russ, J.

    2014-01-01

    We present the preliminary test results of the prototype detector, working at Sphinx Observatory Center, Jungfraujoch (∼3800 m a.s.l.) HFSJG – Switzerland. This prototype detector is designed to measure large zenith angle showers produced by high energy neutrino interactions in the Earth crust. This station provides us an opportunity to understand if the prototype detector works safely (or not) under hard environmental conditions (the air temperature changes between −25 °C and −5 °C). The detector prototype is using silicon photomultiplier (SiPM) produced by SensL and DRS4 chip as read-out part. Measurements at different temperature at fixed bias voltage (∼29.5 V) were performed to reconstruct tracks by Time Of Flight

  15. SiPM application for a detector for UHE neutrinos tested at Sphinx station

    Science.gov (United States)

    Iori, M.; Atakisi, I. O.; Chiodi, G.; Denizli, H.; Ferrarotto, F.; Kaya, M.; Yilmaz, A.; Recchia, L.; Russ, J.

    2014-04-01

    We present the preliminary test results of the prototype detector, working at Sphinx Observatory Center, Jungfraujoch (~3800 m a.s.l.) HFSJG - Switzerland. This prototype detector is designed to measure large zenith angle showers produced by high energy neutrino interactions in the Earth crust. This station provides us an opportunity to understand if the prototype detector works safely (or not) under hard environmental conditions (the air temperature changes between -25 °C and -5 °C). The detector prototype is using silicon photomultiplier (SiPM) produced by SensL and DRS4 chip as read-out part. Measurements at different temperature at fixed bias voltage (~29.5 V) were performed to reconstruct tracks by Time Of Flight.

  16. SiPM application for a detector for UHE neutrinos tested at Sphinx station

    Energy Technology Data Exchange (ETDEWEB)

    Iori, M. [Sapienza University of Rome, Piazzale A. Moro 5, 00185 Rome (Italy); Atakisi, I.O. [University of Kafkas, 36100 Kars (Turkey); Chiodi, G. [INFN, Sezione Roma 1, Piazzale A. Moro 2, 00185 Rome (Italy); Denizli, H. [Abant Izzet Baysal University, 14280 Bolu (Turkey); Ferrarotto, F. [INFN, Sezione Roma 1, Piazzale A. Moro 2, 00185 Rome (Italy); Kaya, M. [University of Kafkas, 36100 Kars (Turkey); Yilmaz, A. [Abant Izzet Baysal University, 14280 Bolu (Turkey); Recchia, L. [INFN, Sezione Roma 1, Piazzale A. Moro 2, 00185 Rome (Italy); Russ, J. [Carnegie-Mellon University, Pittsburgh, PA 15213 (United States)

    2014-04-01

    We present the preliminary test results of the prototype detector, working at Sphinx Observatory Center, Jungfraujoch (∼3800 m a.s.l.) HFSJG – Switzerland. This prototype detector is designed to measure large zenith angle showers produced by high energy neutrino interactions in the Earth crust. This station provides us an opportunity to understand if the prototype detector works safely (or not) under hard environmental conditions (the air temperature changes between −25 °C and −5 °C). The detector prototype is using silicon photomultiplier (SiPM) produced by SensL and DRS4 chip as read-out part. Measurements at different temperature at fixed bias voltage (∼29.5 V) were performed to reconstruct tracks by Time Of Flight.

  17. The association between disease and profitability in individual finishing boars at a test station

    DEFF Research Database (Denmark)

    Jensen, Tina Birk; Baadsgaard, Niels Peter; Houe, Hans

    2008-01-01

    Endemic diseases in finisher herds are considered to be costly for the pig producer. We investigated the effect of diseases on the profit margin using data from a Danish boar test station (n = 5777) collected from July 2002 to December 2004. Boars reaching a target slaughter weight of at least 80...... kg were included in the study. Oral and parenteral treatments were used as indicator of disease in the finishing period and, pathological lesions were used as indicator of disease at slaughter. Profit margin was calculated individually for each boar as the difference between the total revenue......: profit margin. The results showed that treatment in the finishing period had a negative effect on the profit margin. According to the least square means estimates, boars that were treated parenterally had a reduction in the profit margin of 2.24 €. This corresponded to a reduction in the profit margin...

  18. Viking telecommunication effects of GEOS satellite interference based on testing at the Madrid deep space station

    Science.gov (United States)

    Stuhr, F. V.; Kent, S. S.; Galvez, J. L.; Luaces, B. G.; Pasero, G. R.; Urech, J. M.

    1976-01-01

    In support of the ongoing NASA-European Space Agency (ESA) effort to understand and control possible interference between missions, testing was conducted at the Madrid Deep Space Station from July 1975 to February 1976 to characterize the effect on Viking 1975 telecommunication link performance of Geodetic Earth-Orbiting Satellite (GEOS) downlink signals. The prime use of the data was to develop a capability to predict GEOS interference effects for evaluation of Viking 1975 mission impacts and possible temporary GEOS shutdown. Also, the data would serve as a basis for assessment of the GEOS impact on missions other than Viking as well as for more general interference applications. Performances of the reference receiver, telemetry, and planetary ranging were measured in the presence of various types of GEOS-related interference, including an unmodulated GEOS carrier and simulation of the actual spectrum by an ESA-supplied GEOS suitcase model.

  19. Modified SPC for short run test and measurement process in multi-stations

    Science.gov (United States)

    Koh, C. K.; Chin, J. F.; Kamaruddin, S.

    2018-03-01

    Due to short production runs and measurement error inherent in electronic test and measurement (T&M) processes, continuous quality monitoring through real-time statistical process control (SPC) is challenging. Industry practice allows the installation of guard band using measurement uncertainty to reduce the width of acceptance limit, as an indirect way to compensate the measurement errors. This paper presents a new SPC model combining modified guard band and control charts (\\bar{\\text{Z}} chart and W chart) for short runs in T&M process in multi-stations. The proposed model standardizes the observed value with measurement target (T) and rationed measurement uncertainty (U). S-factor (S f) is introduced to the control limits to improve the sensitivity in detecting small shifts. The model was embedded in automated quality control system and verified with a case study in real industry.

  20. Pn seismic wave travel time at the Semipalatinsk Test Site - Borovoe seismic station trace

    International Nuclear Information System (INIS)

    An, V.A.; Kaazik, P.B.; Ovchinnikov, V.M.

    2001-01-01

    This paper preparation involved 160 explosions at the Degelen Site conducted in 1961-1989 and 89 explosions at the Balapan Site conducted in 1968-1989. Pn wave travel time was tied to the sea level in accordance with velocity characteristics of the explosion hypocenter medium; and to average epicentral distance for every site basing on their local travel time curves of Pn wave relative to Borovoe station. Maximum amplitude of mean-year travel times variations is 0.3-0.5 s as at the Nevada Test Site - Borovoe trace and Mirniy (Antarctica). However, the linear trend in contrast to previous traces has negative sign (0.08 s for Degelen and 0.1 s for Balapan). Thus, Pn wave velocity increases with calendar time. (author)

  1. The SOS-LUX-LAC-FLUORO-Toxicity-test on the International Space Station (ISS).

    Science.gov (United States)

    Rabbow, E; Rettberg, P; Baumstark-Khan, C; Horneck, G

    2003-01-01

    In the 21st century, an increasing number of astronauts will visit the International Space Station (ISS) for prolonged times. Therefore it is of utmost importance to provide necessary basic knowledge concerning risks to their health and their ability to work on the station and during extravehicular activities (EVA) in free space. It is the aim of one experiment of the German project TRIPLE-LUX (to be flown on the ISS) to provide an estimation of health risk resulting from exposure of the astronauts to the radiation in space inside the station as well as during extravehicular activities on one hand, and of exposure of astronauts to unavoidable or as yet unknown ISS-environmental genotoxic substances on the other. The project will (i) provide increased knowledge of the biological action of space radiation and enzymatic repair of DNA damage, (ii) uncover cellular mechanisms of synergistic interaction of microgravity and space radiation and (iii) examine the space craft milieu with highly specific biosensors. For these investigations, the bacterial biosensor SOS-LUX-LAC-FLUORO-Toxicity-test will be used, combining the SOS-LUX-Test invented at DLR Germany (Patent) with the commercially available LAC-FLUORO-Test. The SOS-LUX-Test comprises genetically modified bacteria transformed with the pBR322-derived plasmid pPLS-1. This plasmid carries the promoterless lux operon of Photobacterium leiognathi as a reporter element under control of the DNA-damage dependent SOS promoter of ColD as sensor element. This system reacts to radiation and other agents that induce DNA damages with a dose dependent measurable emission of bioluminescence of the transformed bacteria. The analogous LAC-FLUORO-Test has been developed for the detection of cellular responses to cytotoxins. It is based on the constitutive expression of green fluorescent protein (GFP) mediated by the bacterial protein expression vector pGFPuv (Clontech, Palo Alto, USA). In response to cytotoxic agents, this system

  2. Experiences for construction and preoperation test of Shimane nuclear power station

    International Nuclear Information System (INIS)

    Niki, Yoshiya; Taniguchi, Takashi.

    1975-01-01

    Shimane nuclear power station of Chugoku Electric Power Company has begun its commercial operation on March 29, 1974 after the construction period of 49.5 months. The fundamental construction process which Chugoku Electric Power Company and Hitachi Ltd. had agreed was 45 month process, which was the readjustment of the construction process which General Electric Company had presented for preceding nuclear power plants in Japan and its results. The achieved construction and test process required 49.5 months with 4.5 months delay. This delay occurred in two points. The one was caused by the ''upside down'' problem of control rods which had been imported from G.E. The another was caused by the restriction of the rate of load increasing. Fuel charging which indicates the substantial finish of construction works, had begun at May 1, 1973 on schedule. Therefore it can be said that the construction works had been carried out just according to the fundamental process. However, analyzing the result of progress, the pressure test of a reactor containment vessel and the set-up and the first pressure test of a reactor pressure vessel led the schedule by about 2 months. On the contrary, the subsequent works delayed by just that leading time. (Tai, I.)

  3. On test results of the superconducting magnetic energy storage (SMES) system in Ariuragawa Power Station

    International Nuclear Information System (INIS)

    Katahira, Osamu; Fukui, Fumihiko; Karano, Koichi; Irie, Fujio; Takeo, Masakatsu; Okada, Hidehiko; Shimojo, Toshikazu.

    1991-01-01

    SMES system is that for storing electric energy in the form of magnetic energy by flowing DC current through a superconducting coil by utilizing the characteristics of its superconductivity. It comprises a superconducting coil for storing energy, an AC-DC converter, the cooling system for maintaining extremely low temperature and so on. The features of SMES are the high efficiency of storing electric energy (more than 90 % in the large scale system), the fast response to store and release electric power, and effective power and reactive power can be independently and arbitrarily controlled. It is expected that SMES can be applied to the stabilization of electric power system, the adjustment of system voltage, the adjustment of varying load and so on. In order to verify the results of the laboratory research in actual power system, the system test was carried out in Ariuragawa Power Station on November 20-22, 1990. The outline of the test, the method of controlling SMES, the test results and the examination of the results are reported. (K.I.)

  4. Microbiological Tests Performed During the Design of the International Space Station ECLSS: Part 1, Bulk Phase Water and Wastewater

    Science.gov (United States)

    Roman, Monsi C.; Mittelman, Marc W.

    2010-01-01

    This slide presentation summarizes the studies performed to assess the bulk phase microbial community during the Space Station Water Recover Tests (WRT) from 1990-1998. These tests show that it is possible to recycle water from different sources including urine, and produce water that can exceed the quality of municpally produced tap water.

  5. In situ testing of the Shippingport Atomic Power Station electrical circuits

    International Nuclear Information System (INIS)

    Dinsel, M.R.; Donaldson, M.R.; Soberano, F.T.

    1987-04-01

    This report discusses the results of electrical in situ testing of selected circuits and components at the Shippingport Atomic Power Station in Shippingport, Pennsylvania. Testing was performed by EG and G Idaho in support of the United States Nuclear Regulatory Commission (USNRC) Nuclear Plant Aging Research (NPAR) Program. The goal was to determine the extent of aging or degradation of various circuits from the original plant, and the two major coreplant upgrades (representing three distinct age groups), as well as to evaluate previously developed surveillance technology. The electrical testing was performed using the Electrical Circuit Characterization and Diagnostic (ECCAD) system developed by EG and G for the US Department of Energy to use at TMI-2. Testing included measurements of voltage, effective series capacitance, effective series inductance, impedance, effective series resistance, dc resistance, insulation resistance and time domain reflectometry (TDR) parameters. The circuits evaluated included pressurizer heaters, control rod position indicator cables, miscellaneous primary system Resistance Temperature Detectors (RTDs), nuclear instrumentation cables, and safety injection system motor operated valves. It is to be noted that the operability of these circuits was tested after several years had elapsed because plant operations had concluded at Shippingport. There was no need following plant shutdown to retain the circuits in working condition, so no effort was expended for that purpose. The in situ measurements and analysis of the data confirmed the effectiveness of the ECCAD system for detecting degradation of circuit connections and splices because of high resistance paths, with most of the problems caused by corrosion. Results indicate a correlation between the chronological age of circuits and circuit degradation

  6. Manufacturing experience and test results of the PS prototype flexible hybrid circuit for the CMS Tracker Upgrade

    CERN Document Server

    Kovacs, Mark Istvan; Gadek, Tomasz; Honma, Alan; Vasey, Francois

    2017-01-01

    The CMS Tracker Phase-2 Upgrade for HL-LHC requires High Density Interconnect (HDI) flexible hybrid circuits to build modules with low mass and high granularity. The hybrids are carbon fibre reinforced flexible circuits with flip-chips and passives. Three different manufacturers produced prototype hybrids for the Pixel-Strip type modules. The first part of the presentation will focus on the design challenges of this state of the art circuit. Afterwards, the difficulties and experience related to the circuit manufacturing and assembly are presented. The description of quality inspection methods with comprehensive test results will lead to the conclusion.

  7. A flexible testing facility for high-power targets T-MIF

    International Nuclear Information System (INIS)

    Fusco, Y.; Samec, K.; Behzad, M.; Kadi, Y.

    2015-01-01

    A dedicated material test irradiation facility is being proposed. The testing station will allow critical issues concerning materials under irradiation to be addressed, such as the impact of proton beam irradiation, neutron irradiation, liquid metal corrosion and temperature. The material samples to be investigated in such a facility will be subjected to tensile stress, either constant or cyclical. The facility may also be used for sensor development under irradiation and isotope production. The goal of the current work is to propose a facility that is sufficiently versatile and compact so that it may be transported and used in different laboratories. The power is limited to 100 kW. The general aspect of the proposed irradiation facility is a cube, 2 metres deep and comprising within it all the necessary systems. The interface to the laboratory is limited to the coolant connections, the secondary circuit, the electric energy supply and the signals from the instrumentation. The liquid metal target placed in the centre of the facility contains the samples which are subjected to a proton beam, creating irradiation damage directly through protons or indirectly through neutrons created by spallation of the surrounding liquid metal by the incoming protons. The design of the target is based upon the EURISOL target. The same beam window design is used, albeit stretched horizontally to adopt an elliptical section which is compatible with the shape of the beam used to irradiate the samples. The liquid metal in the target is re-circulated by an electromagnetic pump that drives the liquid metal through a heat exchanger located at the top of the facility, the position of which was chosen to encourage natural circulation. The heat exchanger is made up of two separate parts which allow the primary and secondary circuit to separate cleanly

  8. Addressing Challenges to the Design & Test of Operational Lighting Environments for the International Space Station

    Science.gov (United States)

    Clark, Toni A.

    2014-01-01

    In our day to day lives, the availability of light, with which to see our environment, is often taken for granted. The designers of land based lighting systems use sunlight and artificial light as their toolset. The availability of power, quantity of light sources, and variety of design options are often unlimited. The accessibility of most land based lighting systems makes it easy for the architect and engineer to verify and validate their design ideas. Failures with an implementation, while sometimes costly, can easily be addressed by renovation. Consider now, an architectural facility orbiting in space, 260 miles above the surface of the earth. This human rated architectural facility, the International Space Station (ISS) must maintain operations every day, including life support and appropriate human comforts without fail. The facility must also handle logistics of regular shipments of cargo, including new passengers. The ISS requires accommodations necessary for human control of machine systems. Additionally, the ISS is a research facility and supports investigations performed inside and outside its livable volume. Finally, the facility must support remote operations and observations by ground controllers. All of these architectural needs require a functional, safe, and even an aesthetic lighting environment. At Johnson Space Center, our Habitability and Human Factors team assists our diverse customers with their lighting environment challenges, via physical test and computer based analysis. Because of the complexity of ISS operational environment, our team has learned and developed processes that help ISS operate safely. Because of the dynamic exterior lighting environment, uses computational modeling to predict the lighting environment. The ISS' orbit exposes it to a sunrise every 90 minutes, causing work surfaces to quickly change from direct sunlight to earthshine to total darkness. Proper planning of vehicle approaches, robotics operations, and crewed

  9. Nickel-Hydrogen Battery Cell Life Test Program Update for the International Space Station

    Science.gov (United States)

    Miller, Thomas B.

    2000-01-01

    NASA and Boeing North America are responsible for constructing the electrical power system for the International Space Station (ISS), which circles the Earth every 90 minutes in a low Earth orbit (LEO). For approximately 55 minutes of this orbit, the ISS is in sunlight, and for the remaining 35 minutes, the ISS is in the Earth s shadow (eclipse). The electrical power system must not only provide power during the sunlight portion by means of the solar arrays, but also store energy for use during the eclipse. Nickel-hydrogen (Ni/H2) battery cells were selected as the energy storage systems for ISS. Each battery Orbital Replacement Unit (ORU) comprises 38 individual series-connected Ni/H2 battery cells, and there are 48 battery ORU s on the ISS. On the basis of a limited Ni/H2 LEO data base on life and performance characteristics, the NASA Glenn Research Center at Lewis Field commenced testing through two test programs: one in-house and one at the Naval Surface Warfare Center in Crane, Indiana.

  10. The Need and Opportunity for an Integrated Research, Development and Testing Station in the Alaskan High Arctic

    Science.gov (United States)

    Hardesty, J. O.; Ivey, M.; Helsel, F.; Dexheimer, D.; Cahill, C. F.; Bendure, A.; Lucero, D. A.; Roesler, E. L.

    2016-12-01

    This presentation will make the case for development of a permanent integrated research and testing station at Oliktok Point, Alaska; taking advantage of existing assets and infrastructure, controlled airspace, an active UAS program and local partnerships. Arctic research stations provide critical monitoring and research on climate change for conditions and trends in the Arctic. The US Chair of the Arctic Council has increased awareness of gaps in our understanding of Artic systems, scarce monitoring, lack of infrastructure and readiness for emergency response. Less sea ice brings competition for commercial shipping and resource extraction. Search and rescue, pollution mitigation and safe navigation need real-time, wide-area monitoring to respond to events. Multi-national responses for international traffic will drive a greater security presence to protect citizens and sovereign interests. To address research and technology gaps, there is a national need for a High Arctic Station with an approach that partners stakeholders from science, safety and security to develop comprehensive solutions. The Station should offer year-round use, logistic support and access to varied ecological settings; phased adaptation to changing needs; and support testing of technologies such as multiple autonomous platforms, renewable energies and microgrids, and sensors in Arctic settings. We propose an Arctic Station at Oliktok Point, Alaska. Combined with the Toolik Field Station and Barrow Environmental Observatory, they form a US network of Arctic Stations. An Oliktok Point Station can provide complementary and unique assets that include: ocean access, and coastal and terrestrial systems; road access; controlled airspaces on land and ocean; nearby air facilities, medical and logistic support; atmospheric observations from an adjacent ARM facility; connections to Barrow and Toolik; fiber-optic communications; University of Alaska Fairbanks UAS Test Facility partnership; and an airstrip

  11. International Space Station (ISS) Bacterial Filter Elements (BFEs): Filter Efficiency and Pressure Testing of Returned Units

    Science.gov (United States)

    Green, Robert D.; Agui, Juan H.; Vijayakumar, R.

    2017-01-01

    The air revitalization system aboard the International Space Station (ISS) provides the vital function of maintaining a clean cabin environment for the crew and the hardware. This becomes a serious challenge in pressurized space compartments since no outside air ventilation is possible, and a larger particulate load is imposed on the filtration system due to lack of sedimentation due to the microgravity environment in Low Earth Orbit (LEO). The ISS Environmental Control and Life Support (ECLS) system architecture in the U.S. Segment uses a distributed particulate filtration approach consisting of traditional High-Efficiency Particulate Adsorption (HEPA) media filters deployed at multiple locations in each U.S. Segment module; these filters are referred to as Bacterial Filter Elements, or BFEs. These filters see a replacement interval, as part of maintenance, of 2-5 years dependent on location in the ISS. In this work, we present particulate removal efficiency, pressure drop, and leak test results for a sample set of 8 BFEs returned from the ISS after filter replacement. The results can potentially be utilized by the ISS Program to ascertain whether the present replacement interval can be maintained or extended to balance the on-ground filter inventory with extension of the lifetime of ISS beyond 2024. These results can also provide meaningful guidance for particulate filter designs under consideration for future deep space exploration missions.

  12. Qualification of new design of flexible pipe against singing: testing at multiple scales

    NARCIS (Netherlands)

    Golliard, J.; Lunde, K.; Vijlbrief, O.

    2016-01-01

    Flexible pipes for production of oil and gas typically present a corrugated inner surface. This has been identified as the cause of "singing risers": Flow-Induced Pulsations due to the interaction of sound waves with the shear layers at the small cavities present at each of the multiple

  13. Retracted article: Flexible Fourier Stationary Test in GDP per capita for Central Eastern European Countries

    Directory of Open Access Journals (Sweden)

    Meng-Nan Zhu

    2011-06-01

    Full Text Available Statement of Retraction (http://www.efri.uniri.hr/prikaz.asp?txt_id=7366 This is to notify our respectful reading public that the Editorial Board of the journal Zbornik radova Ekonomskog fakulteta u Rijeci, časopis za ekonomsku teoriju i praksu/ Proceedings of Rijeka Faculty of Economics, Journal of Economics and Business has retracted the following article from publication: “Flexible Fourier Stationary Test in GDP per capita for Central Eastern European Countries“, by Hsu-Ling Chang, Chi-Wei Su, Meng-Nan Zhu, published in our journal Zbornik radova Ekonomskog fakulteta u Rijeci, časopis za ekonomsku teoriju i praksu/ Proceedings of Rijeka Faculty of Economics, Journal of Economics and Business, 2011, vol. 29 (1, pp. 51-63 and almost concurrently published in the journal Eastern European Economics, 2011, vol. 49 (3, pp. 54-65. Being in contact with Josef C Brada, Professor Emeritus, Editor of the journal Eastern European Economics (EEE, we realized that the paper had been sent to both journals, although first published in the EEE and then in our Journal. According to professor Brada’s and our analysis, the paper published in these two journals is exactly the same, except for minor differences in wording, most likely due to editing the text before publication. The outstanding differences are in the title and the fact that the paper published in our Journal has three authors and in EEE journal has two. Whatsoever, owing to the fact that the article had been sent to both journals almost at the same time, it had been impossible to find out the case during the review procedure. Due to this unpleasant situation, our Editorial Board would like to inform our valuable readers that all the necessary measures to retract the paper from our publication have been undertaken and according to publishing ethical principles, cooperation with the authors of the retracted paper have been stopped. Although, in this case neither EEE nor our Journal had any

  14. Design, modeling and testing of the Askaryan Radio Array South Pole autonomous renewable power stations

    Energy Technology Data Exchange (ETDEWEB)

    Besson, D.Z., E-mail: zedlam@ku.edu [Department of Physics and Astronomy, University of Kansas, 1082 Malott Hall, 1251 Wescoe Hall Drive, Lawrence, KS 66045-7582 (United States); Moscow Engineering and Physics Institute, 31 Kashirskaya Highway, Moscow 115409 (Russian Federation); Kennedy, D.M., E-mail: dmkennedy@ku.edu [Department of Physics and Astronomy, University of Kansas, 1082 Malott Hall, 1251 Wescoe Hall Drive, Lawrence, KS 66045-7582 (United States); Ratzlaff, K., E-mail: ratzlaff@ku.edu [Instrumentation Design Laboratory, University of Kansas, 6042 Malott Hall, 1251 Wescoe Hall Drive, Lawrence, KS 66045-7582 (United States); Young, R., E-mail: rwyoung@ku.edu [Instrumentation Design Laboratory, University of Kansas, 6042 Malott Hall, 1251 Wescoe Hall Drive, Lawrence, KS 66045-7582 (United States)

    2014-11-01

    We describe the design, construction and operation of the Askaryan Radio Array (ARA) Autonomous Renewable Power Stations, initially installed at the South Pole in December, 2010 with the goal of providing an independently operating 100 W power source capable of year-round operation in extreme environments. In addition to particle astrophysics applications at the South Pole, such a station can easily be, and has since been, extended to operation elsewhere, as described herein.

  15. Design, modeling and testing of the Askaryan Radio Array South Pole autonomous renewable power stations

    International Nuclear Information System (INIS)

    Besson, D.Z.; Kennedy, D.M.; Ratzlaff, K.; Young, R.

    2014-01-01

    We describe the design, construction and operation of the Askaryan Radio Array (ARA) Autonomous Renewable Power Stations, initially installed at the South Pole in December, 2010 with the goal of providing an independently operating 100 W power source capable of year-round operation in extreme environments. In addition to particle astrophysics applications at the South Pole, such a station can easily be, and has since been, extended to operation elsewhere, as described herein

  16. Type test of Class 1E electric cables, field splices, and connections for nuclear power generating stations - 1975

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    This Standard provides direction for establishing type tests which may be used in qualifying Class 1E electric cables, field splices, and other connections for service in nuclear power generating stations. General guidelines for qualifications are given in IEEE Std 323-1974, Standard for Qualifying Class 1E Electric Equipment for Nuclear Power Generating Stations. Categories of cables covered are those used for power control and instrumentation services. Though intended primarily to pertain to cable for field installation, this guide may also be used for the qualification of internal wiring of manufactured devices

  17. A Cryogenic Test Station for the Pre-series 2400 W @ 1.8 K Refrigeration Units for the LHC

    CERN Document Server

    Claudet, S; Gully, P; Jäger, B; Millet, F; Roussel, P; Tavian, L

    2002-01-01

    The cooling capacity below 2 K for the superconducting magnets in the Large Hadron Collider (LHC), at CERN, will be provided by eight refrigeration units at 1.8 K, each of them coupled to a 4.5 K refrigerator. The supply of the series units is linked to successful testing and acceptance of the pre-series delivered by the two selected vendors. To properly assess the performance of specific components such as cold compressors and some process specificities a dedicated test station is necessary. The test station is able to process up to 130 g/s between 4.5 & 20 K and aims at simulating the steady and transient operational modes foreseen for the LHC. After recalling the basic characteristics of the 1.8 K refrigeration units and the content of the acceptance tests of the pre-series, the principle of the test cryostat is detailed. The components of the test station and corresponding layout are described. The first testing experience is presented as well as preliminary results of the pre-series units.

  18. IEEE standard for type test of class 1E electric cables, field splices, and connections for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1974-01-01

    The Institute of Electrical and Electronics Engineers has generated this document to provide guidance for developing a program to type test cables, field splices, and connections and obtain specific type test data. It supplements IEEE Std 323-1974 Standard for Qualifying Class IE Equipment for Nuclear Power Generating Stations, which describes basic requirements for equipment qualification. It is the integrated performance of the structures, fluid systems, the electrical systems, the instrumentation systems of the station, and in particular, the plant protection system, that limits the consequences of accidents. Seismic effects on installed cable systems are not within the scope of this document. Section 2 of this guide is an example of type tests. It is the purpose of this guide to deal with cable and connections; however, at the time of issue, detailed examples of tests for connections were not available

  19. Fabrication, testing and modeling of a new flexible armor inspired from natural fish scales and osteoderms

    International Nuclear Information System (INIS)

    Chintapalli, Ravi Kiran; Mirkhalaf, Mohammad; Dastjerdi, Ahmad Khayer; Barthelat, Francois

    2014-01-01

    Crocodiles, armadillo, turtles, fish and many other animal species have evolved flexible armored skins in the form of hard scales or osteoderms, which can be described as hard plates of finite size embedded in softer tissues. The individual hard segments provide protection from predators, while the relative motion of these segments provides the flexibility required for efficient locomotion. In this work, we duplicated these broad concepts in a bio-inspired segmented armor. Hexagonal segments of well-defined size and shape were carved within a thin glass plate using laser engraving. The engraved plate was then placed on a soft substrate which simulated soft tissues, and then punctured with a sharp needle mounted on a miniature loading stage. The resistance of our segmented armor was significantly higher when smaller hexagons were used, and our bio-inspired segmented glass displayed an increase in puncture resistance of up to 70% compared to a continuous plate of glass of the same thickness. Detailed structural analyses aided by finite elements revealed that this extraordinary improvement is due to the reduced span of individual segments, which decreases flexural stresses and delays fracture. This effect can however only be achieved if the plates are at least 1000 stiffer than the underlying substrate, which is the case for natural armor systems. Our bio-inspired system also displayed many of the attributes of natural armors: flexible, robust with ‘multi-hit’ capabilities. This new segmented glass therefore suggests interesting bio-inspired strategies and mechanisms which could be systematically exploited in high-performance flexible armors. This study also provides new insights and a better understanding of the mechanics of natural armors such as scales and osteoderms. (paper)

  20. Noise test system of rotating machinery in nuclear power station based on microphone array

    Science.gov (United States)

    Chang, Xincai; Guan, Jishi; Qi, Liangcai

    2017-12-01

    Rotating machinery plays an important role in all walks of life. Once the equipment fails, equipment maintenance and shutdown will cause great social harm and economic losses. Equipment safety operations at nuclear power stations have always been of top priority. It is prone to noise when the equipment is out of order or aging. Failure to find or develop equipment at the initial stage of equipment failure or ageing will pose a serious threat to the safety of the plant’s equipment. In this paper, sound imaging diagnosis technology is applied as a supplementary method to the condition monitoring and diagnosis system of rotating machinery in nuclear power stations. It provides a powerful guarantee for the condition monitoring and fault diagnosis of rotating machinery in nuclear power stations.

  1. Is there any difference between Back Saver Sit-Reach Test and Modified Back Saver Sit-Reach Test in estimating hamstring flexibility among the primary school children?

    Directory of Open Access Journals (Sweden)

    Bhoomita Gadhiya

    2014-01-01

    Full Text Available Background: Modified back saver sit-and-reach test (MBSSRT has more advantages over Back saver sit-and-reach test (BSSRT in measuring hamstring flexibility among middle school children and adolescents. However, whether MBSSRT can be used instead of the other among the primary school going children is not yet clear. Objective : To estimate the association between BSSRT and MBSSRT for measuring hamstring flexibility. Procedure : One hundred and forty-one healthy children (5-12 years were selected from the primary school identified by the cluster sampling method for this cross-sectional study. The subjects were asked to perform three trials of BSSRT and MBSSRT (both leg in randomized order. Average was used for data analysis. The association between the two tests was established by Spearman Rank Correlation test. Results: The correlation between BSSRT and MBSSRT for right lower limb ranged from 0.43 to 0.77 with mean correlation of ρ = 0.66 (P < 0.01 and for left lower limb ranged from 0.46 to 0.78 with mean correlation of ρ = 0.68 (P < 0.01. Conclusion: MBSSRT can be used alternatively instead of BSSRT to measure hamstring flexibility among the primary school children.

  2. Performance Testing of Massive MIMO Base Station with Multi-Probe Anechoic Chamber Setups

    DEFF Research Database (Denmark)

    Zhang, Fengchun; Fan, Wei; Ji, Yilin

    2018-01-01

    The utilization of massive multiple-input multipleoutput (MIMO) antenna arrays at the base station (BS) side has been identified as an enabling technique for 5G communication systems. To evaluate the true end-to-end performance of BS's, an over-the-air (OTA) radiated method is required...

  3. Deployment Testing of Flexible Composite Hinges in Bi-Material Beams

    Science.gov (United States)

    Sauder, Jonathan F.; Trease, Brian

    2016-01-01

    Composites have excellent properties for strength, thermal stability, and weight. However, they are traditionally highly rigid, and when used in deployable structures require hinges bonded to the composite material, which increases complexity and opportunities for failure. Recent research in composites has found by adding an elastomeric soft matrix, often silicone instead of an epoxy, the composite becomes flexible. This work explores the deployment repeatability of silicone matrix composite hinges which join rigid composite beams. The hinges were found to have sub-millimeter linear deployment repeatability, and sub-degree angular deployment repeatability. Also, an interesting relaxation effect was discovered, as a hinges deployment error would decrease with time.

  4. Galileo battery testing and the impact of test automation

    Science.gov (United States)

    Pertuch, W. T.; Dils, C. T.

    1985-01-01

    Test complexity, changes of test specifications, and the demand for tight control of tests led to the development of automated testing used for Galileo and other projects. The use of standardized interfacing, i.e., IEEE-488, with desktop computers and test instruments, resulted in greater reliability, repeatability, and accuracy of both control and data reporting. Increased flexibility of test programming has reduced costs by permitting a wide spectrum of test requirements at one station rather than many stations.

  5. The development of test beds to support the definition and evolution of the Space Station Freedom power system

    Science.gov (United States)

    Soeder, James F.; Frye, Robert J.; Phillips, Rudy L.

    1991-01-01

    Since the beginning of the Space Station Freedom Program (SSFP), the NASA Lewis Research Center (LeRC) and the Rocketdyne Division of Rockwell International have had extensive efforts underway to develop testbeds to support the definition of the detailed electrical power system design. Because of the extensive redirections that have taken place in the Space Station Freedom Program in the past several years, the test bed effort was forced to accommodate a large number of changes. A short history of these program changes and their impact on the LeRC test beds is presented to understand how the current test bed configuration has evolved. The current test objectives and the development approach for the current DC test bed are discussed. A description of the test bed configuration, along with its power and controller hardware and its software components, is presented. Next, the uses of the test bed during the mature design and verification phase of SSFP are examined. Finally, the uses of the test bed in the operation and evolution of the SSF are addressed.

  6. International Space Station Environmental Control and Life Support System Acceptance Testing for Node 1 Temperature and Humidity Control Subsystem

    Science.gov (United States)

    Williams, David E.

    2011-01-01

    The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Storage (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper will provide a summary of the Node 1 ECLS THC subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for this subsystem.The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Storage (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper will provide a summary of the Node 1 ECLS THC subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for this subsystem.

  7. International Space Station Environmental Control and Life Support System Acceptance Testing for Node 1 Atmosphere Control and Supply Subsystem

    Science.gov (United States)

    Williams, David E.

    2009-01-01

    The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Supply (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper provides a summary of the Node 1 ECLS ACS subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for that subsystem.

  8. Investigation of accident management procedures related to loss of feedwater and station blackout in PSB-VVER integral test facility

    Energy Technology Data Exchange (ETDEWEB)

    Bucalossi, A. [EC JRC, (JRC F.5) PO Box 2, 1755 ZG Petten (Netherlands); Del Nevo, A., E-mail: alessandro.delnevo@enea.it [ENEA, C.R. Brasimone, 40032 Camugnano (Italy); Moretti, F.; D' Auria, F. [GRNSPG, Universita di Pisa, via Diotisalvi 2, 56100 Pisa (Italy); Elkin, I.V.; Melikhov, O.I. [Electrogorsk Research and Engineering Centre, Electrogorsk, Moscow Region (Russian Federation)

    2012-09-15

    Highlights: Black-Right-Pointing-Pointer Four integral test facility experiments related to VVER-1000 reactor. Black-Right-Pointing-Pointer TH response of the VVER-1000 primary system following total loss of feedwater and station blackout scenarios. Black-Right-Pointing-Pointer Accident management procedures in case of total loss of feedwater and station blackout. Black-Right-Pointing-Pointer Experimental data represent an improvement of existing database for TH code validation. - Abstract: VVER 1000 reactors have some unique and specific features (e.g. large primary and secondary side fluid inventory, horizontal steam generators, core design) that require dedicated experimental and analytical analyses in order to assess the performance of safety systems and the effectiveness of possible accident management strategies. The European Commission funded project 'TACIS 2.03/97', Part A, provided valuable experimental data from the large-scale (1:300) PSB-VVER test facility, investigating accident management procedures in VVER-1000 reactor. A test matrix was developed at University of Pisa (responsible of the project) with the objective of obtaining the experimental data not covered by the OECD VVER validation matrix and with main focus on accident management procedures. Scenarios related to total loss of feed water and station blackout are investigated by means of four experiments accounting for different countermeasures, based on secondary cooling strategies and primary feed and bleed procedures. The transients are analyzed thoroughly focusing on the identification of phenomena that will challenge the code models during the simulations.

  9. Final Bioventing Pilot Test Work Plan for Base Exchange Service Station Underground Storage Tank Area, Vandenberg Air Force Base, California. Part I

    National Research Council Canada - National Science Library

    1992-01-01

    This pilot test work plan presents the scope of an in situ enhanced biological degradation, or "bioventing", pilot test for treatment of gasoline- contaminated soils at the Base Exchange Service Station (BXSS...

  10. Nonpoint Pollution Discharge Permit Testing and Control Strategies at Naval Air Station Whidbey Island.

    Science.gov (United States)

    1991-01-01

    were published in the 16 November 1990 Federal Recister in response to the Water Quality Act of 1987. The existing station permit expires in 1992 and...anaerobic decomposition potential may be of major significance. Biodegradation may not occur, however, if other factors needed for bacterial growth are not... bacterially mediated oxidation of ammonia-nitrogen, these compounds can be toxic to humans or other mammals if present at excessive levels. Sources include

  11. A flexible testing facility for high-power targets (Tiara FP7 program)

    CERN Document Server

    Fusco, Y.; Samec, K.; Kadi, Y.

    2014-01-01

    Building on recent experience in the field of applied physics, TIARA Work package n° 9 focuses on target applications for accelerators in Europe. A roadmap for target development has been derived from major achievements in the EU-FP6 and EU-FP7 programs such as the MEGAPIE and EURISOL experiments. The TIARA management board concluded that a worthwhile continuation of such projects would be in the development of a flexible material irradiation facility easily transportable and which could be installed in different laboratories. The power is limited to 100 kW in a very compact arrangement so as to obtain the best neutron economy from a moderate beam power which is more likely to be found in laboratories across Europe. The challenges posed by such a compact design and accompanying calculations are presented in the current work.

  12. Gust load alleviation wind tunnel tests of a large-aspect-ratio flexible wing with piezoelectric control

    Directory of Open Access Journals (Sweden)

    Ying Bi

    2017-02-01

    Full Text Available An active control technique utilizing piezoelectric actuators to alleviate gust-response loads of a large-aspect-ratio flexible wing is investigated. Piezoelectric materials have been extensively used for active vibration control of engineering structures. In this paper, piezoelectric materials further attempt to suppress the vibration of the aeroelastic wing caused by gust. The motion equation of the flexible wing with piezoelectric patches is obtained by Hamilton’s principle with the modal approach, and then numerical gust responses are analyzed, based on which a gust load alleviation (GLA control system is proposed. The gust load alleviation system employs classic proportional-integral-derivative (PID controllers which treat piezoelectric patches as control actuators and acceleration as the feedback signal. By a numerical method, the control mechanism that piezoelectric actuators can be used to alleviate gust-response loads is also analyzed qualitatively. Furthermore, through low-speed wind tunnel tests, the effectiveness of the gust load alleviation active control technology is validated. The test results agree well with the numerical results. Test results show that at a certain frequency range, the control scheme can effectively alleviate the z and x wingtip accelerations and the root bending moment of the wing to a certain extent. The control system gives satisfying gust load alleviation efficacy with the reduction rate being generally over 20%.

  13. A Flexible Computational Framework Using R and Map-Reduce for Permutation Tests of Massive Genetic Analysis of Complex Traits.

    Science.gov (United States)

    Mahjani, Behrang; Toor, Salman; Nettelblad, Carl; Holmgren, Sverker

    2017-01-01

    In quantitative trait locus (QTL) mapping significance of putative QTL is often determined using permutation testing. The computational needs to calculate the significance level are immense, 10 4 up to 10 8 or even more permutations can be needed. We have previously introduced the PruneDIRECT algorithm for multiple QTL scan with epistatic interactions. This algorithm has specific strengths for permutation testing. Here, we present a flexible, parallel computing framework for identifying multiple interacting QTL using the PruneDIRECT algorithm which uses the map-reduce model as implemented in Hadoop. The framework is implemented in R, a widely used software tool among geneticists. This enables users to rearrange algorithmic steps to adapt genetic models, search algorithms, and parallelization steps to their needs in a flexible way. Our work underlines the maturity of accessing distributed parallel computing for computationally demanding bioinformatics applications through building workflows within existing scientific environments. We investigate the PruneDIRECT algorithm, comparing its performance to exhaustive search and DIRECT algorithm using our framework on a public cloud resource. We find that PruneDIRECT is vastly superior for permutation testing, and perform 2 ×10 5 permutations for a 2D QTL problem in 15 hours, using 100 cloud processes. We show that our framework scales out almost linearly for a 3D QTL search.

  14. Field testing of a 1,300MVA turbine generator for the Oi nuclear-power station

    International Nuclear Information System (INIS)

    Inoue, Toshiaki; Tajiri, Yoshiaki; Ito, Hiroyuki; Fukuda, Mitsuo.

    1980-01-01

    The first Mitsubishi 1,300MVA turbine generator for this power station was put into commercial operation in March 1979, and the second unit in December of that year. The turbine generators use new technology in a variety of areas, including the cooling system, to achieve great increases in capacity over previously designed generators, and are destined to become the worldwide standard for large-scale generators of this type. Valuable experience was gained in the installation and testing of the generators. The outline of the tests performed on the generators with respect to heating and vibration are described in the article. (author)

  15. A 6 kW at 4.5 K helium refrigerator for CERN's Cryogenic Test Station

    International Nuclear Information System (INIS)

    Gistau, G.M.; Bonneton, M.

    1994-01-01

    For purposes of testing the present LEP superconducting resonant cavities and the future LHC magnets, CERN built a test station the cryogenic power of which is presently supplied by a dedicated 6 kW at 4.5 K helium refrigerator. The thermodynamic cycle is discussed and special emphasis is put on a new cryogenic expansion turbine operating in the liquid phase. Information is given about: the cycle screw compressors' performances, the general performance of the refrigerator, the expected efficiency enhancement due to the liquid turbine, an off-design turn down operation

  16. Verification of mechanistic-empirical design models for flexible pavements through accelerated pavement testing : technical summary.

    Science.gov (United States)

    2014-08-01

    Midwest States Accelerated Pavement Testing Pooled-Fund Program, financed by the : highway departments of Kansas, Iowa, and Missouri, has supported an accelerated : pavement testing (APT) project to validate several models incorporated in the NCHRP :...

  17. Verification of mechanistic-empirical design models for flexible pavements through accelerated pavement testing.

    Science.gov (United States)

    2014-08-01

    The Midwest States Accelerated Pavement Testing Pooled Fund Program, financed by the highway : departments of Kansas, Iowa, and Missouri, has supported an accelerated pavement testing (APT) project to : validate several models incorporated in the NCH...

  18. Reliability of a computer software angle tool for measuring spine and pelvic flexibility during the sit-and-reach test.

    Science.gov (United States)

    Mier, Constance M; Shapiro, Belinda S

    2013-02-01

    The purpose of this study was to determine the reliability of a computer software angle tool that measures thoracic (T), lumbar (L), and pelvic (P) angles as a means of evaluating spine and pelvic flexibility during the sit-and-reach (SR) test. Thirty adults performed the SR twice on separate days. The SR test was captured on video and later analyzed for T, L, and P angles using the computer software angle tool. During the test, 3 markers were placed over T1, T12, and L5 vertebrae to identify T, L, and P angles. Intraclass correlation coefficient (ICC) indicated a very high internal consistency (between trials) for T, L, and P angles (0.95-0.99); thus, the average of trials was used for test-retest (between days) reliability. Mean (±SD) values did not differ between days for T (51.0 ± 14.3 vs. 52.3 ± 16.2°), L (23.9 ± 7.1 vs. 23.0 ± 6.9°), or P (98.4 ± 15.6 vs. 98.3 ± 14.7°) angles. Test-retest reliability (ICC) was high for T (0.96) and P (0.97) angles and moderate for L angle (0.84). Both intrarater and interrater reliabilities were high for T (0.95, 0.94) and P (0.97, 0.97) angles and moderate for L angle (0.87, 0.82). Thus, the computer software angle tool is a highly objective method for assessing spine and pelvic flexibility during a video-captured SR test.

  19. Actual and Recalled Test Anxiety and Flexibility, Rigidity, and Self-Control.

    Science.gov (United States)

    DeVito, Anthony J.; Kubis, Joseph F.

    1983-01-01

    Compared recalled and actual test anxiety in college students (N=71) and examined the interrelationship of anxiety with personality variables and sex differences. Results showed recalled test anxiety to be significantly higher than actual test anxiety and indicated no significant differences according to sex. (LLL)

  20. Development and Certification of Ultrasonic Background Noise Test (UBNT) System for use on the International Space Station (ISS)

    Science.gov (United States)

    Prosser, William H.; Madaras, Eric I.

    2011-01-01

    As a next step in the development and implementation of an on-board leak detection and localization system on the International Space Station (ISS), there is a documented need to obtain measurements of the ultrasonic background noise levels that exist within the ISS. This need is documented in the ISS Integrated Risk Management System (IRMA), Watch Item #4669. To address this, scientists and engineers from the Langley Research Center (LaRC) and the Johnson Space Center (JSC), proposed to the NASA Engineering and Safety Center (NESC) and the ISS Vehicle Office a joint assessment to develop a flight package as a Station Development Test Objective (SDTO) that would perform ultrasonic background noise measurements within the United States (US) controlled ISS structure. This document contains the results of the assessment

  1. ASME XI stroke time testing of solenoid valves at Connecticut Yankee Station

    Energy Technology Data Exchange (ETDEWEB)

    Martin, C.W.

    1996-12-01

    Connecticut Yankee Atomic Power Company has developed the capability of measuring the stroke times of AC and DC solenoid valves. This allows the station to measure the stroke time of any solenoid valve in the plant, even those valves which do not have valve stem position indicators. Connecticut Yankee has adapted the ITI MOVATS Checkmate 3 system, using a signal input from a Bruel and Kjaer (B&K) Model 4382 acoustic accelerometer and the Schaumberg Campbell Associates (SCA) Model SCA-1148 dual sensor, which is a combined accelerometer and gaussmeter.

  2. ASME XI stroke time testing of solenoid valves at Connecticut Yankee Station

    International Nuclear Information System (INIS)

    Martin, C.W.

    1996-01-01

    Connecticut Yankee Atomic Power Company has developed the capability of measuring the stroke times of AC and DC solenoid valves. This allows the station to measure the stroke time of any solenoid valve in the plant, even those valves which do not have valve stem position indicators. Connecticut Yankee has adapted the ITI MOVATS Checkmate 3 system, using a signal input from a Bruel and Kjaer (B ampersand K) Model 4382 acoustic accelerometer and the Schaumberg Campbell Associates (SCA) Model SCA-1148 dual sensor, which is a combined accelerometer and gaussmeter

  3. No trade-off between learning speed and associative flexibility in bumblebees: a reversal learning test with multiple colonies.

    Directory of Open Access Journals (Sweden)

    Nigel E Raine

    Full Text Available Potential trade-offs between learning speed and memory-related performance could be important factors in the evolution of learning. Here, we test whether rapid learning interferes with the acquisition of new information using a reversal learning paradigm. Bumblebees (Bombus terrestris were trained to associate yellow with a floral reward. Subsequently the association between colour and reward was reversed, meaning bees then had to learn to visit blue flowers. We demonstrate that individuals that were fast to learn yellow as a predictor of reward were also quick to reverse this association. Furthermore, overnight memory retention tests suggest that faster learning individuals are also better at retaining previously learned information. There is also an effect of relatedness: colonies whose workers were fast to learn the association between yellow and reward also reversed this association rapidly. These results are inconsistent with a trade-off between learning speed and the reversal of a previously made association. On the contrary, they suggest that differences in learning performance and cognitive (behavioural flexibility could reflect more general differences in colony learning ability. Hence, this study provides additional evidence to support the idea that rapid learning and behavioural flexibility have adaptive value.

  4. Debris flow risk mitigation by the means of rigid and flexible barriers – experimental tests and impact analysis

    Directory of Open Access Journals (Sweden)

    L. Canelli

    2012-05-01

    Full Text Available The impact of a debris flow on a structure can have disastrous effects because of the enormous destructive potential of this type of phenomenon. Although the introduction of risk mitigation structures such as the Sabo Dam, the filter dam and more recently flexible barriers is usual, there are very few methods that are universally recognized for the safe design of such structures. This study presents the results of experimental tests, conducted with the use of a specifically created flume, in order to obtain detailed knowledge of the mechanical aspects, and to analyze the dynamics of the impact of a debris flow on different types of structures. The analyses of the tests, together with the calculation of the thrust caused by the flow, have made it possible to analyze the dynamics of the impact, which has shown differing effects, on the basis of the type of barrier that has been installed.

  5. Materials for the field test - students' attitudes to nuclear power stations. Materialien zum Unterrichtsversuch: Kernkraftwerke in der Einstellung von Jugendlichen

    Energy Technology Data Exchange (ETDEWEB)

    Hoffmann, L; Kattmann, U; Lucht, H; Spada, H [Kiel Univ. (Germany, F.R.). Inst. fuer die Paedagogik der Naturwissenschaften (IPN)

    1975-01-01

    This working paper contains all the materials developed for and used in the field test of 'Student Attitudes toward Atomic Power Stations'. This research is a component of a larger project called 'Attitudes and Attitudes Change with Regard to Problems of Energy Supply and their Consequences for our Environment'. A central aim of this project is the development of instrumental strategies enabling the student to build up in this field a critically reflective and active behavior and attitudes based on sound problem consciousness. These instrumental strategies are derived from theories of social, learning and environmental psychology. A concrete result of these efforts are the materials of the field test mentioned above. They include: a) The draft of an instructional unit 'Atomic Power Stations - Prosperity or Disaster' with - a booklet on the subject matter for students and teachers - a paper on the contents of the instructional unit and their sequence - information for the students concerning the aims of the investigation - working materials for the students - reading materials for the teachers informing them about the proposed instructional strategies based on the psychological theories: (1) model-learning and the structuring of knowledge, (2) how to activate and motivate students, (3) the stabilization of attitudes and (4) small group work. b) Instruments for testing and observation. These instruments were used within a criterion-oriented evaluation and for a test of the effects of the different proposed items used in the instruction.

  6. Project W-151 flexible receiver radiation detector system acceptance test plan. Revision 1

    International Nuclear Information System (INIS)

    Troyer, G.L.

    1994-01-01

    The attached document is the Acceptance Test Plan for the portion of Project W-151 dealing with acceptance of gamma-ray detectors and associated electronics manufactured at the Idaho National Engineering Laboratory (INEL). The document provides a written basis for testing the detector system, which will take place in the 305 building (300 Area)

  7. Experimental Test Rig for Optimal Control of Flexible Space Robotic Arms

    Science.gov (United States)

    2016-12-01

    the test bed design. A single link arm with a torsional, helical spring at the base was finalized to investigate the effects of coupling due to...test bed design. A single link arm with a torsional, helical spring at the base was finalized to investigate the effects of coupling due to movement...Source: [4]. A challenge with space systems is that it costs a lot of money to put a satellite or spacecraft into space. Estimates to send one kilogram

  8. Full-Scale Accelerated Testing of Multi-axial Geogrid Stabilized Flexible Pavements

    Science.gov (United States)

    2017-06-01

    a plastic limit (PL) of 27%, and a plasticity index (PI) of 37%, as determined by ASTM D4318. According to the Unified Soil Classification System...USCS), the soil was classified as a high- plasticity clay (CH) and an A-7-6 according to the American Association of State and Highway...Testing and Materials (ASTM). 2010. Standard test methods for liquid limit, plastic limit, and plasticity index of soils . Designation: D 4318-10e1

  9. Low-cost extrapolation method for maximal LTE radio base station exposure estimation: test and validation.

    Science.gov (United States)

    Verloock, Leen; Joseph, Wout; Gati, Azeddine; Varsier, Nadège; Flach, Björn; Wiart, Joe; Martens, Luc

    2013-06-01

    An experimental validation of a low-cost method for extrapolation and estimation of the maximal electromagnetic-field exposure from long-term evolution (LTE) radio base station installations are presented. No knowledge on downlink band occupation or service characteristics is required for the low-cost method. The method is applicable in situ. It only requires a basic spectrum analyser with appropriate field probes without the need of expensive dedicated LTE decoders. The method is validated both in laboratory and in situ, for a single-input single-output antenna LTE system and a 2×2 multiple-input multiple-output system, with low deviations in comparison with signals measured using dedicated LTE decoders.

  10. Low-cost extrapolation method for maximal lte radio base station exposure estimation: Test and validation

    International Nuclear Information System (INIS)

    Verloock, L.; Joseph, W.; Gati, A.; Varsier, N.; Flach, B.; Wiart, J.; Martens, L.

    2013-01-01

    An experimental validation of a low-cost method for extrapolation and estimation of the maximal electromagnetic-field exposure from long-term evolution (LTE) radio base station installations are presented. No knowledge on down-link band occupation or service characteristics is required for the low-cost method. The method is applicable in situ. It only requires a basic spectrum analyser with appropriate field probes without the need of expensive dedicated LTE decoders. The method is validated both in laboratory and in situ, for a single-input single-output antenna LTE system and a 2x2 multiple-input multiple-output system, with low deviations in comparison with signals measured using dedicated LTE decoders. (authors)

  11. Assessment of test methods for evaluating effectiveness of cleaning flexible endoscopes.

    Science.gov (United States)

    Washburn, Rebecca E; Pietsch, Jennifer J

    2018-06-01

    Strict adherence to each step of reprocessing is imperative to removing potentially infectious agents. Multiple methods for verifying proper reprocessing exist; however, each presents challenges and limitations, and best practice within the industry has not been established. Our goal was to evaluate endoscope cleaning verification tests with particular interest in the evaluation of the manual cleaning step. The results of the cleaning verification tests were compared with microbial culturing to see if a positive cleaning verification test would be predictive of microbial growth. This study was conducted at 2 high-volume endoscopy units within a multisite health care system. Each of the 90 endoscopes were tested for adenosine triphosphate, protein, microbial growth via agar plate, and rapid gram-negative culture via assay. The endoscopes were tested in 3 locations: the instrument channel, control knob, and elevator mechanism. This analysis showed substantial level of agreement between protein detection postmanual cleaning and protein detection post-high-level disinfection at the control head for scopes sampled sequentially. This study suggests that if protein is detected postmanual cleaning, there is a significant likelihood that protein will also be detected post-high-level disinfection. It also infers that a cleaning verification test is not predictive of microbial growth. Copyright © 2018 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Elsevier Inc. All rights reserved.

  12. Summary of in-situ tests of filter systems in nuclear power stations

    International Nuclear Information System (INIS)

    Hesboel, R.; Persson, M.

    1980-04-01

    Iodine filter installations at nuclear power plants are systematically tested regarding light assembly and retention of iodine. Studsvik Energiteknik AB has collected a sizeable amount of test data over the years. The filter installations and test methods are described, followed by an analysis of test results and experience over the past 10 years. As a rule in-situ tests have been carried out at low relative humidity, in 90% of them below 50% relative humidity. Variations in flow have been larger than expected, and the variations in operative conditions affect test results. The test method is, however, regarded acceptable for off-gas filter systems. Additional test methods are required for the auxiliary and energency systems. (G.B.)

  13. Pilot tests for dismantling by blasting of the biological shield of a shut down nuclear power station

    International Nuclear Information System (INIS)

    Freund, H.U.

    1995-01-01

    Following free-field tests on concrete blocks the feasibility of explosive dismantling of the biological shield of nuclear power stations has been succesfully tested at the former hotsteam reaction in Karlstein/Main Germany. For this purpose a model shield of scale 1:2 was embedded into the reactor structure at which bore-hole blasting tests employing up to about 15 kg of explosive were performed. An elaborate measurement system allowed to receive detailed information on the blast side-effects: Special emphasis was focussed on the quantitative registration of the dynamic blast loads; data for the transfer of the dismantling method to the removal of real ractor structures were obtained. (orig.) [de

  14. Simulation of the transient behaviour of the Mulheim-Karlich nuclear power station and comparison with startup tests

    International Nuclear Information System (INIS)

    Burchhardt, W.; Weber, J.P.

    1987-01-01

    Among the startup tests of the Mulheim-Karlich nuclear power station an anticipated turbine trip and a rector trip have been performed. Calculations have been done for both tests by the authors using the computer codes DYNODE-P and ALMOD4. At a given reactor power the transient behavior of the plant is determined by the heat load of the once-through steam generators (OTSG), which in turn is governed by the integral control system. As expected the behavior of the plant after the trips can be exactly reproduced only if the bypass control system is completely modelled. In addition the heat transfer to the secondary side of the OTSG which governs the steam production has to be calculated close to reality. comparing the calculated results with the measured test data it is demonstrated that either code can be used to reproduce the transient behavior of the plant

  15. The role of a certified calibration laboratory in a station's measuring and test equipment calibration, repair, and documentation program

    International Nuclear Information System (INIS)

    Ebenstreit, K.; MacIntosh, N.

    1995-01-01

    This paper outlines the role of a Certified Calibration Laboratory in- ensuring that the requirements of Measuring and Test Equipment calibration, identification, and traceability are met and documented. The Nuclear environment is one which is subject to influences from numerous 'quality agents'. One of the fields which comes under the scrutiny of the quality agents is that of equipment calibration and repair (both field components and M and TE). There is a responsibility to produce a superior product for the Ontario Consumer. The maintenance and calibration of Station Systems and their components have a direct impact on this output. The Measuring and Test Equipment element in each of these needs can be addressed by having a defined group of Maintenance Staff to execute a Measuring and Test Equipment Program which meets specific parameters. (author)

  16. Thermo-Mechanical Test of Seal System in Flexible Pipe End Fittings

    DEFF Research Database (Denmark)

    Banke, Lars

    1999-01-01

    are driven radially into the barrier layer and supported by the surrounding steel casing. In order to verify the integrity of the concept the seal system is subjected cyclic pressure and temperature variations to simulate the service conditions.The aim of the testing is to demonstrate the sensitivity...... of the seal system geometry and its tolerances necessary to maintain a tight seal. The test is carried out in a purpose built autoclave, in which the seal system can be tested while undergoing variations in pressure and temperature.The paper will present a study on the importance of the geometry of the gasket...... and the inner liner. The inner and outer diameter of the gasket are varied to see the effectiveness of the seal mechanism. The effect of varying the width of the gasket as well as the surface roughness of the components in the seal system is analysed. Finally, it is investigated how the seal system is affected...

  17. International Space Station Lithium-Ion Main Battery Thermal Runaway Propagation Test

    Science.gov (United States)

    Dalton, Penni J.; North, Tim

    2017-01-01

    In 2010, the ISS Program began the development of Lithium-Ion (Li-Ion) batteries to replace the aging Ni-H2 batteries on the primary Electric Power System (EPS). After the Boeing 787 Li-Ion battery fires, the NASA Engineering and Safety Center (NESC) Power Technical Discipline Team was tasked by ISS to investigate the possibility of Thermal Runaway Propagation (TRP) in all Li-Ion batteries used on the ISS. As part of that investigation, NESC funded a TRP test of an ISS EPS non-flight Li-Ion battery. The test was performed at NASA White Sands Test Facility in October 2016. This paper will discuss the work leading up to the test, the design of the test article, and the test results.

  18. Development of large high-voltage pressure insulators for the Princeton TFTR [Tokamak Fusion Test Reactor] flexible transmission lines

    International Nuclear Information System (INIS)

    Scalise, D.T.; Fong, E.; Haughian, J.; Prechter, R.

    1986-10-01

    Specially formulated insulator materials with improved strength and high-voltage properties were developed and used for critical components of the flexible transmission lines to the TFTR neutral beam ion sources. These critical components are plates which support central conductors as they exit the high-voltage power supply and enter the ion source enclosure. Each plate acts both as a high-voltage insulator and as a pressure barrier to the SF 6 insulating gas. The original plate was made of commercial glass-epoxy laminate which limited the plate voltage capacity. The newly developed insulator is made of specially-formulated cycloalphatic Di-epoxide whose isotropic properties exhibit increased arc resistance. It is cast in one piece with skirts which greatly increase the breakdown voltage. This paper discusses the design, fabrication and testing of the new insulator

  19. Construction and start-up testing experience of Kashiwazakikariwa Nuclear Power Station Unit No.1

    International Nuclear Information System (INIS)

    Natsume, Nobuo; Murakami, Hideaki

    1986-01-01

    In order to overcome the new location condition in Japan Sea coast, new techniques were developed and adopted to ensure the safety in construction and to shorten the construction period as far as possible. The commercial operation was started on September 18, 1985. This plant is a BWR plant of 1100 MWe output. The results of the improvement and standardization of BWRs and the measures for reliability improvement and radiation dose reduction were fully adopted in this plant. The site of the power station and the layout of the main facilities are explained. As the features of the location condition, the severe weather condition in winter such as snow, wind and lightning and high waves in the sea were considered. The rockbed for installing the foundation of the reactor building was deep, and the aseismatic design condition was made stricter, accordingly, the quantity of materials increased. A tent dome was developed to cover above the reactor containment vessel being assembled, a lightning forecast system was installed, and synchro-lift method was adopted for caisson breakwaters. The countermeasures to the deep rockbed and the measures to shorten the construction period were taken. The results of the trial operation are reported. (Kako, I.)

  20. Materials International Space Station Experiment (MISSE) 5 Developed to Test Advanced Solar Cell Technology Aboard the ISS

    Science.gov (United States)

    Wilt, David M.

    2004-01-01

    The testing of new technologies aboard the International Space Station (ISS) is facilitated through the use of a passive experiment container, or PEC, developed at the NASA Langley Research Center. The PEC is an aluminum suitcase approximately 2 ft square and 5 in. thick. Inside the PEC are mounted Materials International Space Station Experiment (MISSE) plates that contain the test articles. The PEC is carried to the ISS aboard the space shuttle or a Russian resupply vehicle, where astronauts attach it to a handrail on the outer surface of the ISS and deploy the PEC, which is to say the suitcase is opened 180 deg. Typically, the PEC is left in this position for approximately 1 year, at which point astronauts close the PEC and it is returned to Earth. In the past, the PECs have contained passive experiments, principally designed to characterize the durability of materials subjected to the ultraviolet radiation and atomic oxygen present at the ISS orbit. The MISSE5 experiment is intended to characterize state-of-art (SOA) and beyond photovoltaic technologies.

  1. Study of the mechanical properties of the electric power station components: the punch test

    International Nuclear Information System (INIS)

    Isselin, J.

    2003-03-01

    The aging of the electric production park implies an increasing need of knowledge concerning the evolution of the mechanical properties of its components. With regard to this problem, the availability in material is more and more small. This work proposes to characterize these properties through a mechanical test called Punch test. The main characteristic of this test is to use very small volume samples. The development of this test has been carried out by the study of a 15 MDV 4-05 steel coming from a steam drum of a thermal power plant after 145000 hours of service. At first, we have measured the influence of the parameters of this test. Then, the study has dealt more particularly on the transition temperature of the material. With the finite element simulation method, the strain hardening coefficient of the material has been determined. (O.M.)

  2. Tests of Shaft Seal Systems of Circulation Pumps during Station Blackout

    Energy Technology Data Exchange (ETDEWEB)

    Beisiegel, A.; Foppe, F.; Wich, M.

    2014-07-01

    AREVA GmbH operates a unique Thermal-hydraulic plat form in Germany, France and USA. It is recognised as a test body according to ISO 17025. The Deutsche Akkreditierungsstelle GmbH (DAkkS - German Society for Accreditation) has also certified the Thermal-hydraulic platform as an independent inspection body Type C according to ISO 17020. A part of this platform is the Component Laboratory located in Karlstein, Germany which is in operation since more than 50 years. The testing activities cover a wide range as: Critical Heat Flux Tests, Valve Testing and Environmental Qualification for safety related components. Since 2011 the Component Qualification Karlstein extended their testing scope for different types of Shaft Seal Systems. (Author)

  3. Testing the reliability of supply pipings of the pump-fed power station Markersbach

    Energy Technology Data Exchange (ETDEWEB)

    Radtke, W; Perout, A; Hellwig, K

    1981-01-01

    The leakage tests for the pressurised part of steam raising units is carried out during erection of steam raising units by halogen leak indicators. The effect which is produced by spontaneous change of alkali emission of a glowing anode if it comes into contact with molecules containing halogens is used. The erection leak detection equipment which is independent of the mains supply, works on the principle of high voltage corona discharge. Other equipment is also described briefly. All the equipment described uses dichlorfluormethane (CF/sub 2/Cl/sub 2/) as the halogen test gas - with the commercial name Fridohna 12. The test pressure in the pressurised part of the steam raising unit is 0.5 MPa and the mixing ratio of Fridohna 12 to compressed air is 0.12 kg of Fridohna 12 to 1 cubic metre of atmospheric air. The halogen leak test is superior to the water pressure test.

  4. Captive chimpanzee foraging in a social setting: a test of problem solving, flexibility, and spatial discounting

    Science.gov (United States)

    Kurtycz, Laura M.; Ross, Stephen R.; Bonnie, Kristin E.

    2015-01-01

    In the wild, primates are selective over the routes that they take when foraging and seek out preferred or ephemeral food. Given this, we tested how a group of captive chimpanzees weighed the relative benefits and costs of foraging for food in their environment when a less-preferred food could be obtained with less effort than a more-preferred food. In this study, a social group of six zoo-housed chimpanzees (Pan troglodytes) could collect PVC tokens and exchange them with researchers for food rewards at one of two locations. Food preference tests had revealed that, for these chimpanzees, grapes were a highly-preferred food while carrot pieces were a less-preferred food. The chimpanzees were tested in three phases, each comprised of 30 thirty-minute sessions. In phases 1 and 3, if the chimpanzees exchanged a token at the location they collected them they received a carrot piece (no travel) or they could travel ≥10 m to exchange tokens for grapes at a second location. In phase 2, the chimpanzees had to travel for both rewards (≥10 m for carrot pieces, ≥15 m for grapes). The chimpanzees learned how to exchange tokens for food rewards, but there was individual variation in the time it took for them to make their first exchange and to discover the different exchange locations. Once all the chimpanzees were proficient at exchanging tokens, they exchanged more tokens for grapes (phase 3). However, when travel was required for both rewards (phase 2), the chimpanzees were less likely to work for either reward. Aside from the alpha male, all chimpanzees exchanged tokens for both reward types, demonstrating their ability to explore the available options. Contrary to our predictions, low-ranked individuals made more exchanges than high-ranked individuals, most likely because, in this protocol, chimpanzees could not monopolize the tokens or access to exchange locations. Although the chimpanzees showed a preference for exchanging tokens for their more-preferred food, they

  5. Extended Bioventing Testing Results at the BX Service Station Site, Patrick AFB, Florida

    National Research Council Canada - National Science Library

    Marchand, Ed

    1997-01-01

    .... Soil gas samples were collected, and in situ respiration testing was performed by Parsons ES from 8 to 14 November 1996 to assess the extent of remediation completed during approximately 3 months...

  6. Human Factors Assessment of the UH-60M Crew Station During the Limited User Test (LUT)

    National Research Council Canada - National Science Library

    Havir, Thomas J; Durbin, David B; Frederick, Lorraine J; Hicks, Jamison S

    2006-01-01

    The utility helicopter (UH)-60M Product Manager requested the U.S. Army Research Laboratory's Human Research and Engineering Directorate to participate in the Limited User Test for the UH-60M Black Hawk...

  7. Performance testing of the environmental TLD system for the Three Mile Island Nuclear Station.

    Science.gov (United States)

    Toke, L F; Carson, B H; Baker, G G; McBride, M H; Plato, P A; Miklos, J A

    1984-05-01

    Panasonic UD-801 thermoluminescent dosimeters ( TLDs ) containing two calcium sulfate phosphors were tested under Performance Specification 3.1 established by the American National Standard Institute ( ANSI75 ) and in the U.S. Nuclear Regulatory Commission's Regulatory Guide 4.13 ( NRC77 ). The specific qualifying tests included TLD uniformity, reproducibility, energy dependence and directional dependence. The overall measurement uncertainties and associated confidence levels are within the prescribed guidelines defined in the qualifying requirements for environmental TLDs .

  8. Structural integrity test of prestressed concrete containment vessel for Tsuruga Unit No. 2 Nuclear Power Station

    International Nuclear Information System (INIS)

    Tamura, S.; Nagata, K.; Takeda, T.; Yamaguchi, T.; Nakayama, T.

    1987-01-01

    In introducing the PCCV to Japan, various verification tests were carried out to understand the structural performance of the PCCV and confirm the reliability of its design. In addition to those tests, a Structural Integrity Test (SIT) was conducted in Feb. 1986 as a final acceptance test. This report discusses the results of the SIT on the PCCV. The test was carried out simultaneously with an Integrated Leak Rate Test (ILRT) under the same pressure sequence. 1) Pressure-displacement relationships and pressure-strain relationships were more or less linear. 2) The measured displacement values at the maximum pressure (4.5 kgf/cm 2 G) corresponded well with calculated values. Correspondence with converted displacement obtained from strain and measured displacement was also good. 3) The residual displacement when 24 hours had elapsed after completion of depressurization was not more than 10% of the displacement at the maximum pressure. 4) The variation in tendon force at the maximum pressure is smaller than the calculated value in proportion to the elongation of the PCCV. 5) Although fine surface cracks due to shrinkage of concrete were seen, new structural cracks due to pressure were not observed. The leakage rate was evaluated at 0.016% of volume per day. It is much smaller than the design value of 0.1% of volume per day. (orig./HP)

  9. Risk-based inservice testing program modifications at Palo Verde nuclear generating station

    Energy Technology Data Exchange (ETDEWEB)

    Knauf, S.; Lindenlaub, B.; Linthicum, R.

    1996-12-01

    Arizona Public Service Company (APS) is investigating changes to the Palo Verde Inservice Testing (IST) Program that are intended to result in the reduction of the required test frequency for various valves in the American Society of Mechanical Engineers (ASME) Section XI IST program. The analytical techniques employed to select candidate valves and to demonstrate that these frequency reductions are acceptable are risk based. The results of the Palo Verde probabilistic risk assessment (PRA), updated in June 1994, and the risk significant determination performed as part of the implementation efforts for 10 CFR 50.65 (the maintenance rule) were used to select candidate valves for extended test intervals. Additional component level evaluations were conducted by an `expert panel.` The decision to pursue these changes was facilitated by the ASME Risk-Based Inservice Testing Research Task Force for which Palo Verde is participating as a pilot plant. The NRC`s increasing acceptance of cost beneficial licensing actions and risk-based submittals also provided incentive to seek these changes. Arizona Public Service is pursuing the risk-based IST program modification in order to reduce the unnecessary regulatory burden of the IST program through qualitative and quantitative analysis consistent with maintaining a high level of plant safety. The objectives of this project at Palo Verde are as follows: (1) Apply risk-based technologies to IST components to determine their risk significance (i.e., high or low). (2) Apply a combination of deterministic and risk-based methods to determine appropriate testing requirements for IST components including improvement of testing methods and frequency intervals for high-risk significant components. (3) Apply risk-based technologies to high-risk significant components identified by the {open_quotes}expert panel{close_quotes} and outside of the IST program to determine whether additional testing requirements are appropriate.

  10. Risk-based inservice testing program modifications at Palo Verde nuclear generating station

    International Nuclear Information System (INIS)

    Knauf, S.; Lindenlaub, B.; Linthicum, R.

    1996-01-01

    Arizona Public Service Company (APS) is investigating changes to the Palo Verde Inservice Testing (IST) Program that are intended to result in the reduction of the required test frequency for various valves in the American Society of Mechanical Engineers (ASME) Section XI IST program. The analytical techniques employed to select candidate valves and to demonstrate that these frequency reductions are acceptable are risk based. The results of the Palo Verde probabilistic risk assessment (PRA), updated in June 1994, and the risk significant determination performed as part of the implementation efforts for 10 CFR 50.65 (the maintenance rule) were used to select candidate valves for extended test intervals. Additional component level evaluations were conducted by an 'expert panel.' The decision to pursue these changes was facilitated by the ASME Risk-Based Inservice Testing Research Task Force for which Palo Verde is participating as a pilot plant. The NRC's increasing acceptance of cost beneficial licensing actions and risk-based submittals also provided incentive to seek these changes. Arizona Public Service is pursuing the risk-based IST program modification in order to reduce the unnecessary regulatory burden of the IST program through qualitative and quantitative analysis consistent with maintaining a high level of plant safety. The objectives of this project at Palo Verde are as follows: (1) Apply risk-based technologies to IST components to determine their risk significance (i.e., high or low). (2) Apply a combination of deterministic and risk-based methods to determine appropriate testing requirements for IST components including improvement of testing methods and frequency intervals for high-risk significant components. (3) Apply risk-based technologies to high-risk significant components identified by the open-quotes expert panelclose quotes and outside of the IST program to determine whether additional testing requirements are appropriate

  11. IEEE guide for planning of pre-operational testing programs for class 1E power systems for nuclear-power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The Institute of Electrical and Electronics Engineers (IEEE) guide for pre-operational testing of Class 1E power systems for nuclear-power generating stations is presented. The guidelines apply to power systems both ac and dc supplies but not to the equipment which utilizes the ac and dc power. The pre-operational tests are performed after appropriate construction tests

  12. Waste water processing technology for Space Station Freedom - Comparative test data analysis

    Science.gov (United States)

    Miernik, Janie H.; Shah, Burt H.; Mcgriff, Cindy F.

    1991-01-01

    Comparative tests were conducted to choose the optimum technology for waste water processing on SSF. A thermoelectric integrated membrane evaporation (TIMES) subsystem and a vapor compression distillation subsystem (VCD) were built and tested to compare urine processing capability. Water quality, performance, and specific energy were compared for conceptual designs intended to function as part of the water recovery and management system of SSF. The VCD is considered the most mature and efficient technology and was selected to replace the TIMES as the baseline urine processor for SSF.

  13. Creating multithemed ecological regions for macroscale ecology: Testing a flexible, repeatable, and accessible clustering method

    Science.gov (United States)

    Cheruvelil, Kendra Spence; Yuan, Shuai; Webster, Katherine E.; Tan, Pang-Ning; Lapierre, Jean-Francois; Collins, Sarah M.; Fergus, C. Emi; Scott, Caren E.; Norton Henry, Emily; Soranno, Patricia A.; Filstrup, Christopher T.; Wagner, Tyler

    2017-01-01

    Understanding broad-scale ecological patterns and processes often involves accounting for regional-scale heterogeneity. A common way to do so is to include ecological regions in sampling schemes and empirical models. However, most existing ecological regions were developed for specific purposes, using a limited set of geospatial features and irreproducible methods. Our study purpose was to: (1) describe a method that takes advantage of recent computational advances and increased availability of regional and global data sets to create customizable and reproducible ecological regions, (2) make this algorithm available for use and modification by others studying different ecosystems, variables of interest, study extents, and macroscale ecology research questions, and (3) demonstrate the power of this approach for the research question—How well do these regions capture regional-scale variation in lake water quality? To achieve our purpose we: (1) used a spatially constrained spectral clustering algorithm that balances geospatial homogeneity and region contiguity to create ecological regions using multiple terrestrial, climatic, and freshwater geospatial data for 17 northeastern U.S. states (~1,800,000 km2); (2) identified which of the 52 geospatial features were most influential in creating the resulting 100 regions; and (3) tested the ability of these ecological regions to capture regional variation in water nutrients and clarity for ~6,000 lakes. We found that: (1) a combination of terrestrial, climatic, and freshwater geospatial features influenced region creation, suggesting that the oft-ignored freshwater landscape provides novel information on landscape variability not captured by traditionally used climate and terrestrial metrics; and (2) the delineated regions captured macroscale heterogeneity in ecosystem properties not included in region delineation—approximately 40% of the variation in total phosphorus and water clarity among lakes was at the regional

  14. The in-situ testing of high efficiency particulate filters in the CEGB south eastern region nuclear power stations

    International Nuclear Information System (INIS)

    Powell, A.W.; Wilkinson, B.A.

    1977-01-01

    High efficiency air filters are installed in the CEGB's Nuclear Power Stations to prevent discharge of radioactive material to the environment should the ventilation air become contaminated. The Board has determined that these filter units should be tested in-situ to ensure that the stringent design specifications are met. This paper describes the rig work comparing the British Standard method using sodium chloride aerosol with other test methods, such as Dioctyl Phthalate, naturally occurring dust aerosols and artificially produced condensation nuclei. This work led to the development of an in-situ test method using condensation nuclei and a Pollak-Nolan nucleus counter. The advantages and disadvantages of this method over other methods for in-situ testing is discussed. The test method has been used in the South Eastern Region for several years and considerable experience has been gained in its use on a wide variety of filter systems. The method adopted for each system is detailed including the injection, sampling and interpretation of the results obtained. Numerous faults and difficulties have been highlighted from the design, installation and filter changing aspects

  15. Morphoagrobiological properties and productivity of new soft winter wheat varieties under the conditions of Kirovohrad variety testing station

    Directory of Open Access Journals (Sweden)

    О. Л. Уліч

    2017-03-01

    Full Text Available Purpose. To study morphoagrobiological and adaptive properties, level of yielding capacity of recently registered soft winter wheat varieties of various ecological groups under agroecological conditions of Kirovohrad variety testing station. Methods. Field study, laboratory test, analytical procedure and statistical evaluation. Results. It was established that the yield level of is a key composite indicator of genotype adaptation to agroecological growing conditions. Experimental data indicate significant deviations of yield depending on the genotype and the year of study. During three years of experiments, yield depending of the variety ranged from 4.26 to 9.71 t/ha, such varieties as ‘CN Kombin’, ‘Estivus’, ‘Tradytsiia odeska’, ‘Mudrist odeska’, ‘Lil’ and ‘Fabius’ had higher yields. In case of dry weather conditions and unfavorable agro-ecological factors, the following varieties as ‘Mudrist odeska’, ‘Veteran’, ‘Lil’, ‘Tsentylivka’, ‘Fabius’, ‘Patras’, ‘Montrei’ have demonstrated good adaptive properties. Their yield has decreased by 9,2–19,0%, while in the varieties ‘Mahistral’, ‘Poltavka’, ‘Harantiia odeska’ and ‘Pokrova’ – by 34.4, 42.4, 45.2 and 50.6% accordingly. Conclusions. Investigated soft winter wheat varieties differ in morphoagrobiological characteristics, productivity, height, maturation period, adaptability as well as economic and agronomic value. According to the complex of such indices as productivity, agronomic characters and properties as well as adaptability, in the microzone of Kirovohrad variety testing station it is advisable to grow varie­ties ‘CN Kombi’, ‘Pokrova’, ‘Mudrist odeska’, ‘Veteran’ and ‘Lil’.

  16. Vehicle Impact Testing of Snow Roads at McMurdo Station, Antarctica

    Science.gov (United States)

    2014-06-01

    especially during warm weather when their high flotation tires al- low greater over-snow mobility. Table 2. Test vehicle information. Vehicle Vehicle...potential danger to the vehicle and pax 16 ERDC/CRREL TR-14-9 51 GO SLOWTI-U<OtJG-ISBTFOR YOLH?. SAFETY LANE C SCOTT BASE TRANSIT/ONTO SILVER

  17. Space station common module thermal management: Design and construction of a test bed

    Science.gov (United States)

    Barile, R. G.

    1986-01-01

    In this project, a thermal test bed was designed, simulated, and planned for construction. The thermal system features interior and exterior thermal loads and interfacing with the central-radiator thermal bus. Components of the test bed include body mounted radiator loop with interface heat exchangers (600 Btu/hr); an internal loop with cabin air-conditioning and cold plates (3400 Btu/hr); interface heat exchangers to the central bus (13,000 Btu/hr); and provisions for new technology including advanced radiators, thermal storage, and refrigeration. The apparatus will be mounted in a chamber, heated with lamps, and tested in a vacuum chamber with LN2-cooled walls. Simulation of the test bed was accomplished using a DEC PRO 350 computer and the software package TK! olver. Key input variables were absorbed solar radiation and cold plate loads. The results indicate temperatures on the two loops will be nominal when the radiation and cold plate loads are in the range of 25% to 75% of peak loads. If all loads fall to zero, except the cabin air system which was fixed, the radiator fluid will drop below -100 F and may cause excessive pressure drop. If all loads reach 100%, the cabin air temperature could rise to 96 F.

  18. Guideline on in-service testing (IST) of ECCS for nuclear power stations in Japan

    International Nuclear Information System (INIS)

    Yamashita, N.; Honjin, M.; Yamazaki, M.; Iwami, H.

    2001-01-01

    In Japan, METI (Ministry of Economy, Trade and Industry) periodic inspections are conducted every 13 months in accordance with the EUIL (Electric Utility Industry Law) for light water reactors. On the other hand, during operation, many kinds of function tests are conducted in accordance with Technical Specifications or utilities voluntary test procedures. However, these maintenance activities during outages are in other respects considered too costly and more than necessary because of its predetermined maintenance interval and its old-fashioned full scope maintenance menu. In these circumstances, the ASME O and M Codes and Standards, which are applied to nuclear power plants in the United States, came to be one of the issues to be considered among Japanese utilities. This is because the ASME O and M Codes and Standards, which are developed to verify the operational readiness of equipment or systems by condition based maintenance or performance testing without overhauls, will be considered to suggest a rational alternative to our existing maintenance activities. Because there had been no standard for function tests other than the METI inspection procedures in Japan, activities started for the development of Japanese Operation and Maintenance Guideline (hereinafter called the Japanese OM Guideline or the Guideline) for function tests and condition monitoring. The Japanese OM Guideline is not proclaimed for regulatory use, but the long-term objective is to provide a substantial basis to change the current maintenance activities including regulatory inspection. The Guideline is composed of five parts, which are general requirements, pumps, valves, snubbers and ECCS systems. This paper gives a summary of the ECCS part of the Japanese OM Guideline, in particular, focusing on the differences between the Guideline and the ASME O and M Standards, and topics or discussion during their establishment. (author)

  19. Waste Transfer Stations

    DEFF Research Database (Denmark)

    Christensen, Thomas Højlund

    2011-01-01

    tion and transport is usually the most costly part of any waste management system; and when waste is transported over a considerable distance or for a long time, transferring the waste from the collection vehicles to more efficient transportation may be economically beneficial. This involves...... a transfer station where the transfer takes place. These stations may also be accessible by private people, offering flexibility to the waste system, including facilities for bulky waste, household hazardous waste and recyclables. Waste transfer may also take place on the collection route from small...... describes the main features of waste transfer stations, including some considerations about the economical aspects on when transfer is advisable....

  20. Flexible Bronchoscopy.

    Science.gov (United States)

    Miller, Russell J; Casal, Roberto F; Lazarus, Donald R; Ost, David E; Eapen, George A

    2018-03-01

    Flexible bronchoscopy has changed the course of pulmonary medicine. As technology advances, the role of the flexible bronchoscope for both diagnostic and therapeutic indications is continually expanding. This article reviews the historical development of the flexible bronchoscopy, fundamental uses of the flexible bronchoscope as a tool to examine the central airways and obtain diagnostic tissue, and the indications, complications, and contraindications to flexible bronchoscopy. Copyright © 2017 Elsevier Inc. All rights reserved.

  1. Mechanical design, analysis, and laboratory testing of a dental implant with axial flexibility similar to natural tooth with periodontal ligament.

    Science.gov (United States)

    Pektaş, Ömer; Tönük, Ergin

    2014-11-01

    At the interface between the jawbone and the roots of natural teeth, a thin, elastic, shock-absorbing tissue, called the periodontal ligament, forms a cushion which provides certain flexibility under mechanical loading. The dental restorations supported by implants, however, involve comparatively rigid connections to the jawbone. This causes overloading of the implant while bearing functional loading together with neighboring natural teeth, which leads to high stresses within the implant system and in the jawbone. A dental implant, with resilient components in the upper structure (abutment) in order to mimic the mechanical behavior of the periodontal ligament in the axial direction, was designed, analyzed in silico, and produced for mechanical testing. The aims of the design were avoiding high levels of stress, loosening of the abutment connection screw, and soft tissue irritations. The finite element analysis of the designed implant revealed that the elastic abutment yielded a similar axial mobility with the natural tooth while keeping stress in the implant at safe levels. The in vitro mechanical testing of the prototype resulted in similar axial mobility predicted by the analysis and as that of a typical natural tooth. The abutment screw did not loosen under repeated loading and there was no static or fatigue failure. © IMechE 2014.

  2. Principal facts of gravity stations with gravity and magnetic profiles from the southwest Nevada Test Site, Nye County, Nevada, as of January 1982

    International Nuclear Information System (INIS)

    Jansma, P.E.; Snyder, D.B.; Ponce, D.A.

    1983-01-01

    Three gravity profiles and principal facts of 2604 gravity stations in the southwest quadrant of the Nevada Test Site are documented in this data report. The residual gravity profiles show the gravity measurements and the smoothed curves derived from these points that were used in geophysical interpretations. The principal facts include station label, latitude, longitude, elevation, observed gravity value, and terrain correction for each station as well as the derived complete Bouguer and isostatic anomalies, reduced at 2.67 g/cm 3 . Accuracy codes, where available, further document the data

  3. Gas and water permeability tests of 25 year old concrete from the NPD Nuclear Generating Station

    International Nuclear Information System (INIS)

    Mills, R.H.

    1990-05-01

    Permeability tests on cores recovered from concrete which had been in service for 25 years in the Nuclear Power Demonstration (NPD) reactor showed rates of mass transfer of gas and water which were greater than young fresh concrete of the same proportions and that reported in previous AECB reports. This transparency of the concrete was also 2 orders of magnitude greater than that of comparable concrete which had been stored in the laboratory atmosphere for 19 years. Analysis of the effluent in water permeability tests revealed the presence of unusual amounts of soluble materials, mainly Na and K but little Ca, in the reactor concrete. This suggested service-related deterioration of the concrete rather than the release of soluble Ca by continuing hydration of cement

  4. IEEE Std 600: IEEE trial-use standard requirements for organizations that conduct qualification testing of safety systems equipment for use in nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The purpose of this standard is to provide requirements for establishing a program for conducting qualification tests of safety systems equipment used in nuclear power generating stations. Compliance with the requirements of this standard does not assure the adequacy of the qualification tests performed. This standard applies to organizations that conduct qualification tests on equipment that has a definable safety function and is an identifiable part of a safety system for use in nuclear power generating stations. It requires a technical program, a quality assurance program, and a demonstrated ability to meet specified technical requirements. It does not apply to materials tests, production tests, normal performance testing, qualification by analysis, qualification by operating experience, or reliability tests such as diesel-generator multiple start tests. The intent of this standard is to achieve greater consistency, reliability, and reproducibility of test results and to provide adequate control of qualification testing of safety systems equipment

  5. Determination of neutron energy spectrum at a pneumatic rabbit station of a typical swimming pool type material test research reactor

    International Nuclear Information System (INIS)

    Malkawi, S.R.; Ahmad, N.

    2002-01-01

    The method of multiple foil activation was used to measure the neutron energy spectrum, experimentally, at a rabbit station of Pakistan Research Reactor-1 (PARR-1), which is a typical swimming pool type material test research reactor. The computer codes MSITER and SANDBP were used to adjust the spectrum. The pre-information required by the adjustment codes was obtained by modelling the core and its surroundings in three-dimensions by using the one dimensional transport theory code WIMS-D/4 and the multidimensional finite difference diffusion theory code CITATION. The input spectrum covariance information required by MSITER code was also calculated from the CITATION output. A comparison between calculated and adjusted spectra shows a good agreement

  6. The development and testing of a volatile organics concentrator for use in monitoring Space Station water quality

    Science.gov (United States)

    Bodek, Itamar; Ehntholt, Daniel J.; Stolki, Thomas J.; Trabanino, Rudy; Hinsdale, Lloyd; Webb, Johanna; Sauer, Richard L.

    1992-01-01

    The Volatile Organics Concentrator (VOC) system, designed to attach to a gas chromatograph/mass spectrometer (GC/MS) for the analyses of volatile organic compounds in water on Space Station Freedom, is described. Organic volatiles are collected and concentrated in the VOC by means of two primary solid sorbent tubes and desorbed into the GC/MS system. The paper describes the results of testing the VOC breadboard using a GC/MS system. Evaluations performed on 39 organic compounds recovered from water samples were compared with data for these compounds using direct injection/GC/MS and purge and trap/GC/MS procedures. The results demonstrate that the VOC/GC/MS system's detection limits for the 39 compounds analyzed are comparable to those of the EPA Method 524.2, and for many compounds reaching a factor of 5 lower.

  7. Construction and start-up tests for Unit No. 5 of Fukushima Daiichi Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Fujita, T; Sunami, Y; Ishii, N; Yokojima, T [Toshiba Corp., Kawasaki, Kanagawa (Japan)

    1978-12-01

    This unit, with an output capacity of 874 MWe, was completed by Toshiba last April on the basis of the actual operation records of the units previously completed and the experience in construction. Since its completion it has continued very excellent operation, with no emergency stop. This article is a description of the Unit 5, about: (1) the design and major points of improvement; (2) the construction work and cleaning of the plant; and (3) the operation tests, the use of the first automatic fuel exchanger, and the plant management system including the rust-preventive measures for two years since the oil-crisis.

  8. Development and qualification of a thermal-hydraulic nodalization for modeling station blackout accident in PSB-VVER test facility

    Energy Technology Data Exchange (ETDEWEB)

    Saghafi, Mahdi [Department of Energy Engineering, Sharif University of Technology, Azadi Avenue, Tehran (Iran, Islamic Republic of); Ghofrani, Mohammad Bagher, E-mail: ghofrani@sharif.edu [Department of Energy Engineering, Sharif University of Technology, Azadi Avenue, Tehran (Iran, Islamic Republic of); D’Auria, Francesco [San Piero a Grado Nuclear Research Group (GRNSPG), University of Pisa, Via Livornese 1291, San Piero a Grado, Pisa (Italy)

    2016-07-15

    Highlights: • A thermal-hydraulic nodalization for PSB-VVER test facility has been developed. • Station blackout accident is modeled with the developed nodalization in MELCOR code. • The developed nodalization is qualified at both steady state and transient levels. • MELCOR predictions are qualitatively and quantitatively in acceptable range. • Fast Fourier Transform Base Method is used to quantify accuracy of code predictions. - Abstract: This paper deals with the development of a qualified thermal-hydraulic nodalization for modeling Station Black-Out (SBO) accident in PSB-VVER Integral Test Facility (ITF). This study has been performed in the framework of a research project, aiming to develop an appropriate accident management support tool for Bushehr nuclear power plant. In this regard, a nodalization has been developed for thermal-hydraulic modeling of the PSB-VVER ITF by MELCOR integrated code. The nodalization is qualitatively and quantitatively qualified at both steady-state and transient levels. The accuracy of the MELCOR predictions is quantified in the transient level using the Fast Fourier Transform Base Method (FFTBM). FFTBM provides an integral representation for quantification of the code accuracy in the frequency domain. It was observed that MELCOR predictions are qualitatively and quantitatively in the acceptable range. In addition, the influence of different nodalizations on MELCOR predictions was evaluated and quantified using FFTBM by developing 8 sensitivity cases with different numbers of control volumes and heat structures in the core region and steam generator U-tubes. The most appropriate case, which provided results with minimum deviations from the experimental data, was then considered as the qualified nodalization for analysis of SBO accident in the PSB-VVER ITF. This qualified nodalization can be used for modeling of VVER-1000 nuclear power plants when performing SBO accident analysis by MELCOR code.

  9. Testing the sampling efficiency of a nuclear power station stack monitor

    Energy Technology Data Exchange (ETDEWEB)

    Stroem, L.H. [Instrumentinvest, Nykoeping (Sweden)

    1997-08-01

    The test method comprises the injection of known amounts of monodisperse particles in the stack air stream, at a suitable point upstream of the sampling installation. To find a suitable injection polls, the gas flow was mapped by means of a tracer gas, released in various points in the stack base. The resulting concentration distributions at the stack sampler level were observed by means of an array of gas detectors. An injection point that produced symmetrical distribution over the stack area, and low concentrations at the stack walls was selected for the particle tests. Monodisperse particles of 6, 10, and 19 {mu}m aerodynamic diameter, tagged with dysprosium, were dispersed in the selected injection point. Particle concentration at the sampler level was measured. The losses to the stack walls were found to be less than 10 %. The particle concentrations at the four sampler inlets were calculated from the observed gas distribution. The amount calculated to be aspirated into the sampler piping was compared with the quantity collected by the sampling train ordinary filter, to obtain the sampling line transmission efficiency. 1 ref., 2 figs.

  10. Base Station Performance Model

    OpenAIRE

    Walsh, Barbara; Farrell, Ronan

    2005-01-01

    At present the testing of power amplifiers within base station transmitters is limited to testing at component level as opposed to testing at the system level. While the detection of catastrophic failure is possible, that of performance degradation is not. This paper proposes a base station model with respect to transmitter output power with the aim of introducing system level monitoring of the power amplifier behaviour within the base station. Our model reflects the expe...

  11. Flexible endoscopic evaluation of swallowing with sensory testing in patients with unilateral vocal fold immobility: incidence and pathophysiology of aspiration.

    Science.gov (United States)

    Tabaee, Abtin; Murry, Thomas; Zschommler, Anne; Desloge, Rosemary B

    2005-04-01

    The objective was to examine the incidence and pathophysiology of aspiration in patients with unilateral vocal fold immobility presenting with dysphagia. Retrospective review of flexible endoscopic evaluation of swallowing with sensory testing (FEESST) data and medical records in two tertiary medical care centers. The data for all patients with unilateral vocal fold immobility who underwent FEESST between 2000 and 2003 were reviewed. Eighty-one patients (45 male and 36 female patients) were included in the study. The mean age was 59 years. The most common causes or origins were iatrogenic (42%), malignancy (23%), and neurological (18%). The immobility was left-sided in 59% of patients. A majority of the patients exhibited laryngeal edema/erythema (90%), difficulty with secretions (60%), and decreased laryngopharyngeal sensation (83%). The laryngeal adductor reflex was absent in 34% of the patients. An aspiration rate of 35% was detected with thin liquids. Trials of purees revealed a 76% rate of pooling, 44% rate of spillage, 32% rate of penetration, 18% rate of aspiration, and 24% rate of regurgitation. Rates of penetration and aspiration with purees were significantly higher in patients who had decreased laryngopharyngeal sensation, absent pharyngeal squeeze, and absent laryngeal adductor reflex. Dysphagia in patients with unilateral vocal fold immobility is demonstrated during FEESST by pooling, spillage, penetration, and aspiration. The pathophysiology of dysphagia is multifactorial with decreased sensation and limitation of airway protective mechanisms both acting as contributing factors.

  12. Prototype Software for Future Spaceflight Tested at Mars Desert Research Station

    Science.gov (United States)

    Clancey, William J.; Sierhuis, Maaretn; Alena, Rick; Dowding, John; Garry, Brent; Scott, Mike; Tompkins, Paul; vanHoof, Ron; Verma, Vandi

    2006-01-01

    NASA scientists in MDRS Crew 49 (April 23-May 7, 2006) field tested and significantly extended a prototype monitoring and advising system that integrates power system telemetry with a voice commanding interface. A distributed, wireless network of functionally specialized agents interacted with the crew to provide alerts (e.g., impending shut-down of inverter due to low battery voltage), access md interpret historical data, and display troubleshooting procedures. In practical application during two weeks, the system generated speech over loudspeakers and headsets lo alert the crew about the need to investigate power system problems. The prototype system adapts the Brahms/Mobile Agents toolkit to receive data from the OneMeter (Brand Electronics) electric metering system deployed by Crew 47. A computer on the upper deck was connected to loudspeakers, four others were paired with wireless (Bluetooth) headsets that enabled crew members to interact with their personal agents from anywhere in the hab. Voice commands and inquiries included: 1. What is the {battery | generator} {volts | amps | volts and amps}? 2. What is the status of the {generator | inverter | battery | solar panel}? 3. What is the hab{itat} {power usage | volts | voltage | amps | volts and amps}? 4. What was the average hab{itat} {amps | volts | voltage} since {AM | PM)? 5. When did the {generator | batteries} change status? 6. Tell {me I | everyone} when{ ever} the generator goes offline. 7. Tell {me | | everyone} when the hab{itat} {amps | volts | voltage} {exceeds | drops brelow} . 8. {Send | Take | Record} {a} voice note {(for | to} } {at }. This research demonstrates the principles of design in the context of use, investigating requirements through experimental use of prototype systems in an analog setting, and use of MDRS as a research facility for designing and implementing new systems.

  13. On flexibility

    OpenAIRE

    Weiss, Christoph R.; Briglauer, Wolfgang

    2000-01-01

    By building on theoretical work by Mills and Schumann (1985) and Ungern-Sternberg (1990) this paper provides evidence on the determinants of two dimensions of flexibility, the flexibility in adjusting aggregate output over time (tactical flexibility) as well as the ability to switch quickly between products (operational flexibility). Econometric analysis of a sample of 40.000 farms in Upper-Austria for the period 1980 to 1990 suggests that larger full-time farms operated by younger, better ed...

  14. Approach to the assessment of the performance of nondestructive test methods in the manufacture of nuclear power station equipment

    International Nuclear Information System (INIS)

    Michaut, J.P.

    1996-01-01

    The safety of a nuclear power station lies largely in the possibility of ensuring, at the time of in service inspections on major equipment, that the extent of faults which may appear or develop is not greater than that of faults detrimental to behavior in service. This assurance is based on performance demonstration of the nondestructive test methods used for inspecting the equipment in service. This is the subject of numerous studies in various countries. To ensure that manufacturing faults likely to downgrade the safety of the equipment are not discovered in service, it seems desirable to make sure that the performance of the nondestructive test (NDT) methods which are going to be used in manufacture will be at least as high as those used in service and that they are therefore capable of guaranteeing detection of faults clearly less important than really harmful faults. The performance of NDT methods and their consistency with those which can be used in service is evaluated before the start of manufacture on a mock-up representative of the equipment itself. Information is given on research in progress on the bimetal welding of a pressurizer spray nozzle

  15. Field pilot testing for chemical oxidation at the former Nitchequon meteorological station : decontamination project in isolated areas

    Energy Technology Data Exchange (ETDEWEB)

    Peisajovich, A. [Transport Canada, Montreal, PQ (Canada); Bergeron, E. [Golder Associates Ltd., Montreal, PQ (Canada); Barbeau, M. [Golder Associates Innovative Applications, Montreal, PQ (Canada); Lajoie, G. [Cree Regional Authority, Montreal, PQ (Canada)

    2006-07-01

    Field pilot testing for chemical oxidation at the former Nitchequon meteorological station was discussed. This presentation described the site location and provided an aerial view and cross section of the site. The historical background and condition of the site were then identified. Photographs and illustrations of the site and the source of the problem were provided. Photographs were also provided of the logistics, temporary camp, dismantling of tanks, equipment, pipeline dismantling, residues, methodology as well as a graphical representation of how to solve the problem. Other topics included technologies tested on site, full-scale remediation plans, remediation goals, step by step process, and costs distribution. Among the steps discussed was: vegetation removal; excavation of the first two feet of soil; transfer of contaminated soil on high-density polyethylene (HDPE) lining prior to treatment; cell construction; cell lining insulation; transfer of treated soil from the mixers to the curing cells; installation of HDPE top cover lining over the treated soil; and the addition of 12 inches of clean soil over the top cover lining. tabs., figs.

  16. Field Testing of Activated Carbon Injection Options for Mercury Control at TXU's Big Brown Station

    Energy Technology Data Exchange (ETDEWEB)

    John Pavlish; Jeffrey Thompson; Christopher Martin; Mark Musich; Lucinda Hamre

    2009-01-07

    The primary objective of the project was to evaluate the long-term feasibility of using activated carbon injection (ACI) options to effectively reduce mercury emissions from Texas electric generation plants in which a blend of lignite and subbituminous coal is fired. Field testing of ACI options was performed on one-quarter of Unit 2 at TXU's Big Brown Steam Electric Station. Unit 2 has a design output of 600 MW and burns a blend of 70% Texas Gulf Coast lignite and 30% subbituminous Powder River Basin coal. Big Brown employs a COHPAC configuration, i.e., high air-to-cloth baghouses following cold-side electrostatic precipitators (ESPs), for particulate control. When sorbent injection is added between the ESP and the baghouse, the combined technology is referred to as TOXECON{trademark} and is patented by the Electric Power Research Institute in the United States. Key benefits of the TOXECON configuration include better mass transfer characteristics of a fabric filter compared to an ESP for mercury capture and contamination of only a small percentage of the fly ash with AC. The field testing consisted of a baseline sampling period, a parametric screening of three sorbent injection options, and a month long test with a single mercury control technology. During the baseline sampling, native mercury removal was observed to be less than 10%. Parametric testing was conducted for three sorbent injection options: injection of standard AC alone; injection of an EERC sorbent enhancement additive, SEA4, with ACI; and injection of an EERC enhanced AC. Injection rates were determined for all of the options to achieve the minimum target of 55% mercury removal as well as for higher removals approaching 90%. Some of the higher injection rates were not sustainable because of increased differential pressure across the test baghouse module. After completion of the parametric testing, a month long test was conducted using the enhanced AC at a nominal rate of 1.5 lb/Macf. During

  17. Analysis of the forced vibration test of the Hualien large scale soil-structure interaction model using a flexible volume substructuring method

    International Nuclear Information System (INIS)

    Tang, H.T.; Nakamura, N.

    1995-01-01

    A 1/4-scale cylindrical reactor containment model was constructed in Hualien, Taiwan for foil-structure interaction (SSI) effect evaluation and SSI analysis procedure verification. Forced vibration tests were executed before backfill (FVT-1) and after backfill (FVT-2) to characterize soil-structure system characteristics under low excitations. A number of organizations participated in the pre-test blind prediction and post-test correlation analyses of the forced vibration test using various industry familiar methods. In the current study, correlation analyses were performed using a three-dimensional flexible volume substructuring method. The results are reported and soil property sensitivities are evaluated in the paper. (J.P.N.)

  18. Demonstration test of electron beam flue gas treatment pilot plant of a coal fired thermal power station

    International Nuclear Information System (INIS)

    Doi, Yoshitaka; Hayashi, Kazuaki; Izutsu, Masahiro; Watanabe, Shigeharu; Namba, Hideki; Tokunaga, Okihiro; Hashimoto, Shoji; Tanaka, Tadashi; Ogura, Yoshimi.

    1995-01-01

    The Japan Atomic Energy Research Institute, Chubu Electric Power Company and Ebara Corporation jointly constructed a pilot plant for electron beam flue gas treatment (dry process) capable of treating 12,000 m 3 /h (NTP) of flue gas from a coal fired boiler, at Shin-Nagoya Thermal Power Station, Chubu Electric Power Company. Various tests carried out at the plant over a period extending one year verified the followings. By appropriately controlling parameters such as electron beam dosage, flue gas temperature, and ammonia stoichiometric amount, highly efficient simultaneous SO 2 and NOx removal from flue gas was achieved under all gas conditions, equal to or more efficient than that by the highest level conventional treatment. The operation of the pilot plant was stable and trouble-free over a long term, and the operation and the process was easy to operate and control. By-products (ammonium sulfate and ammonium nitrate) produced by the flue gas treatment were proven to have superior quality, equivalent to that of market-available nitrogen fertilizers. These by-products had been registered as by-product nitrogen fertilizers. (author)

  19. The International Space Station: A Low-Earth Orbit (LEO) Test Bed for Advancements in Space and Environmental Medicine

    Science.gov (United States)

    Ruttley, Tara M.; Robinson, Julie A.

    2010-01-01

    Ground-based space analog projects such as the NASA Extreme Environment Mission Operations (NEEMO) can be valuable test beds for evaluation of experimental design and hardware feasibility before actually being implemented on orbit. The International Space Station (ISS) is an closed-system laboratory that orbits 240 miles above the Earth, and is the ultimate extreme environment. Its inhabitants spend hours performing research that spans from fluid physics to human physiology, yielding results that have implications for Earth-based improvements in medicine and health, as well as those that will help facilitate the mitigation of risks to the human body associated with exploration-class space missions. ISS health and medical experiments focus on pre-flight and in-flight prevention, in-flight treatment, and postflight recovery of health problems associated with space flight. Such experiments include those on enhanced medical monitoring, bone and muscle loss prevention, cardiovascular health, immunology, radiation and behavior. Lessons learned from ISS experiments may not only be applicable to other extreme environments that face similar capability limitations, but also serve to enhance standards of care for everyday use on Earth.

  20. Overview of Microbiological Tests Performed During the Design of the International Space Station Environmental Control and Life Support Systems

    Science.gov (United States)

    Roman, Monsi C.; Mittelman, Marc W.

    2010-01-01

    The design and manufacturing of the main Environmental Control and Life Support Systems (ECLSS) for the United States segments of the International Space Station (ISS) was an involved process that started in the late 1980's, with the assessment and testing of competing technologies that could be used to clean the air and recycle water. It culminated in 2009 with the delivery and successful activation of the Water Recovery System (WRS) water processor (WP). The ECLSS required the work of a team of engineers and scientist working together to develop systems that could clean and/or recycle human metabolic loads to maintain a clean atmosphere and provide the crew clean water. One of the main goals of the ECLSS is to minimize the time spent by the crew worrying about vital resources not available in the vacuum of space, which allows them to spend most of their time learning to live in a microgravity environment many miles from the comforts of Earth and working on science experiments. Microorganisms are a significant part of the human body as well as part of the environment that we live in. Therefore, the ISS ECLSS design had to take into account the effect microorganisms have on the quality of stored water and wastewater, as well as that of the air systems. Hardware performance issues impacted by the accumulation of biofilm and/or microbiologically influenced corrosion were also studied during the ECLSS development stages. Many of the tests that were performed had to take into account the unique aspects of a microgravity environment as well as the challenge of understanding how to design systems that could not be sterilized or maintained in a sterile state. This paper will summarize the work of several studies that were performed to assess the impacts and/or to minimize the effects of microorganisms in the design of a closed loop life support system.

  1. Corrective Action Investigation Plan for Corrective Action Unit 321: Area 22 Weather Station Fuel Storage, Nevada Test Site, Nevada; TOPICAL

    International Nuclear Information System (INIS)

    1999-01-01

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO (1996), CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites. A CAU consists of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at the CAU 321 Area 22 Weather Station Fuel Storage, CAS 22-99-05 Fuel Storage Area. For purposes of this discussion, this site will be referred to as either CAU 321 or the Fuel Storage Area. The Fuel Storage Area is located in Area 22 of the Nevada Test Site (NTS). The NTS is approximately 105 kilometers (km) (65 miles[mi]) northwest of Las Vegas, Nevada (Figure 1-1) (DOE/NV, 1996a). The Fuel Storage Area (Figure 1-2) was used to store fuel and other petroleum products necessary for motorized operations at the historic Camp Desert Rock facility which was operational from 1951 to 1958 at the Nevada Test Site, Nevada. The site was dismantled after 1958 (DOE/NV, 1996a)

  2. Analysis of technological innovation in Danish wind turbine industry - including the Test Station for Windturbines dual roll as research institution and certification authority

    International Nuclear Information System (INIS)

    Dannemand Andersen, P.

    1993-01-01

    The overall aim of this thesis is to examine the interactions between the Danish wind turbine industry and the Test Station for Wind Turbines. Because these interactions are concerning technological innovation, it follows that the innovation processes within the enterprises must be analyzed and modelled. The study is carried out as an iterative model-developing process using case study methods. The findings from some less structured interviews are discussed with literature and forms a basis for models and new interviews. The thesis is based on interviews with 20 R and D engineers in the Danish wind turbine industry, 7 engineers at The Test Station and 7 people involved in wind power abroad (American and British). The theoretical frame for this thesis is sociology/organizational theory and industrial engineering. The thesis consists of five main sections, dealing with technology and knowledge, innovation processes, organizational culture, innovation and interaction between the Test Station's research activities and the companies' innovation processes, and finally interaction through the Test Stations certification activity. First a taxonomy for technology and knowledge is established in order to clarify what kind of technology the interactions are all about, and what kind of knowledge is transferred during the interactions. This part of the thesis also contains an analysis of the patents drawn by the Danish wind turbine industry. The analysis shows that the Danish wind turbine industry do not use patents. Instead the nature of the technology and the speed of innovation are used to protect the industry's knowledge. (EG) (192 refs.)

  3. Test des photomultiplicateurs en silicium couplés à un scintillateur plastique pour la nouvelle Tape Station

    CERN Document Server

    sekal, Smain

    2014-01-01

    L’une des parties essentielles de la l’installation ISOLDE est la tape Station (contrôleur de bandes), qui permet la vérification de la qualité du faisceau délivré aux expériences. On prévoit à ISOLDE de remplacer l’ancienne Tape Station, par une nouvelle Tape station; et l’un des paramètres essentiels pour la performance de la tape Station est l’efficacité de détection. Le but de ce travail est de vérifier l’efficacité des détecteurs de particules bêta, composés par l’association des photomultiplicateurs en Silicium à un scintillateur plastique pour differentes distances.

  4. Tests of a new CCD-camera based neutron radiography detector system at the reactor stations in Munich and Vienna

    Energy Technology Data Exchange (ETDEWEB)

    Lehmann, E; Pleinert, H [Paul Scherrer Inst. (PSI), Villigen (Switzerland); Schillinger, B [Technische Univ. Muenchen (Germany); Koerner, S [Atominstitut der Oesterreichischen Universitaeten, Vienna (Austria)

    1997-09-01

    The performance of the new neutron radiography detector designed at PSI with a cooled high sensitive CCD-camera was investigated under real neutronic conditions at three beam ports of two reactor stations. Different converter screens were applied for which the sensitivity and the modulation transfer function (MTF) could be obtained. The results are very encouraging concerning the utilization of this detector system as standard tool at the radiography stations at the spallation source SINQ. (author) 3 figs., 5 refs.

  5. IEEE Std 383-1974: IEEE standard for type test of Class IE electric cables, field splices, and connections for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This standard provides direction for establishing type tests which may be used in qualifying Class 1E electric cables, field splices, and other connections for service in nuclear power generating stations. General guidelines for qualifications are given in IEEE Std 323-1974, Standard for Qualifying Class IE Electric Equipment for Nuclear Power Generating Stations. Categories of cables covered are those used for power control and instrumentation services. Though intended primarily to pertain to cable for field installation, this guide may also be used for the qualification of internal wiring of manufactured devices. This guide does not cover cables for service within the reactor vessel

  6. Fire Stations

    Data.gov (United States)

    Department of Homeland Security — Fire Stations in the United States Any location where fire fighters are stationed or based out of, or where equipment that such personnel use in carrying out their...

  7. Gas recovery and self-testing systm in gasoline stations. Execution of practical field tests / phase of tests in the wholistic system; Gasrueckfuehrung und selbstueberwachende Systeme an Tankstellen. Durchfuehrung von praktischen Feldtests/Testphase im ganzheitlichen System

    Energy Technology Data Exchange (ETDEWEB)

    Altmann, B.R.; Kunter, S.; Maurer, C.; Schneider, T.; Schrittenlacher, W.; Maahsen, H.; Arts, M.

    2003-04-01

    The amendment of the 21{sup st} Regulation on Air-Pollution Control dated 17.05.2002 describes continuous control of the function of gas recovery systems in gasoline stations by automatic control systems. Both systems available in the market (supplied by FAFNIR and TOKHEIM) were tested in extensive field tests. Both systems are ready for mass production. New dispensers are delivered with self control systems per production-type since 1.04.2003. Supplementary kits for the different dispenser types are available. (orig.)

  8. Conflicting flexibility

    NARCIS (Netherlands)

    De Jong, P.; Schaap, A.

    2011-01-01

    New buildings are designed for first users. For a sustainable approach there are many advantages in designing in flexibility and adjustability in order to enable and facilitate the other sequential users. For the first investor this flexibility is translated into improved exit values due to

  9. Flexible Carbon Aerogels

    Directory of Open Access Journals (Sweden)

    Marina Schwan

    2016-09-01

    Full Text Available Carbon aerogels are highly porous materials with a large inner surface area. Due to their high electrical conductivity they are excellent electrode materials in supercapacitors. Their brittleness, however, imposes certain limitations in terms of applicability. In that context, novel carbon aerogels with varying degree of flexibility have been developed. These highly porous, light aerogels are characterized by a high surface area and possess pore structures in the micrometer range, allowing for a reversible deformation of the aerogel network. A high ratio of pore size to particle size was found to be crucial for high flexibility. For dynamic microstructural analysis, compression tests were performed in-situ within a scanning electron microscope allowing us to directly visualize the microstructural flexibility of an aerogel. The flexible carbon aerogels were found to withstand between 15% and 30% of uniaxial compression in a reversible fashion. These findings might stimulate further research and new application fields directed towards flexible supercapacitors and batteries.

  10. Applicability of AWJ technique for dismantling reactor of the Fukushima Daiichi Nuclear Power Station. Cutting test of imitation of fuel debris and optimization of the cutting condition

    International Nuclear Information System (INIS)

    Maruyama, Shin-ichiro; Watatani, Satoshi

    2016-01-01

    Based on findings during recovery works that followed the accident at Three Mile Island Station 2, it is assumed that the reactor internals at the Fukushima Daiichi Nuclear Power Station (1F) have complex geometries intermixed with melted fuel and confined in limited spaces. Accordingly, abrasive water jet (AWJ) cutting method is considered to be a promising technique that can be safely and reasonably used for cutting and removing reactor internals. The authors conducted tests to examine the possibility of application and to solve the problems of this technique. In the tests imitation of fuel debris and optimization of the cutting condition is used. The test result made the measures for some of the associated issues clear, and demonstrated that AWJ cutting method is assumed as one of the promising techniques for removing reactor internals. (author)

  11. Application of the Trail Making Test in the assessment of cognitive flexibility in patients with speech disorders after ischaemic cerebral stroke

    Directory of Open Access Journals (Sweden)

    Anna Rajtar-Zembaty

    2015-04-01

    Full Text Available The main aim of this study was to evaluate the level of cognitive flexibility in patients with speech disorders after ischaemic cerebral stroke. The study was conducted in a group of 43 patients (18 women and 25 men who had experienced cerebral ischaemic stroke. The patients under study were divided into groups based on the type of speech disorders, i.e.: aphasia, lack of speech disorders and dysarthria. A Mini-Mental State Examination (MMSE and a Clock Drawing Test (CDT were applied for the general evaluation of the efficiency of cognitive functions. Cognitive flexibility – a component of executive functions, was evaluated with the use of a Trail Making Test (TMT. The results obtained prove that patients with aphasia show the lowest level of cognitive flexibility. Disorders of executive functions can be related to the dysfunction of the prefrontal cortex which has been damaged as a result of ischaemic cerebral stroke. Presumably, there are common functional neuroanatomical circuits for both language skills and components of executive functions. In the case of damage to the structures that are of key importance for both skills, language and executive dysfunctions can therefore occur in parallel. The presence of executive dysfunctions in patients with aphasia can additionally impede the functioning of the patient, and also negatively influence the process of rehabilitation the aim of which is to improve the efficiency of communication.

  12. Technical evaluation of the noise and isolation testing of the safety features actuation system at the Davis Besse Nuclear Power Station, Unit 1

    International Nuclear Information System (INIS)

    Selan, J.C.

    1981-07-01

    This report documents the technical evaluation of the noise and isolation testing of the safety features actuation system at the Davis Besse Nuclear Power Station, Unit 1. The tests were to verify that faults on the non-Class 1E circuits would not propagate to the Class 1E circuits and degrade them below acceptable levels. The tests conducted demonstrated that the safety features actuation system did not degrade below acceptable levels nor was the system's ability to perform its protective functions affected

  13. Radiological survey of the area surrounding the National Reactor Testing Station, Idaho Falls, Idaho. Date of survey: 1 and 2 February 1972

    International Nuclear Information System (INIS)

    1974-01-01

    The Aerial Radiological Measuring System (ARMS) was used to survey the National Reactor Testing Station (NRTS) during February 1972. The purpose of the survey was primarily to identify the presence of Ru-106 and Rh-106 in a release from the Chemical Processing Plant at NRTS. Additionally, the gamma-ray terrestrial exposure rate levels were mapped and the distribution of any man-made isotopes was located and defined

  14. Amtrak Stations

    Data.gov (United States)

    Department of Homeland Security — Updated database of the Federal Railroad Administration's (FRA) Amtrak Station database. This database is a geographic data set containing Amtrak intercity railroad...

  15. IEEE Std 381-1977: IEEE standard criteria for type tests of Class 1E modules used in nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This document describes the basic requirements of a type test program with the objective of verifying that a module used as Class 1E equipment in a nuclear power generating station meets or exceeds its design specifications. This document is limited to class 1E modules from and including the sensor through the logic circuitry of the final actuation devices. Except for those that are part of a module, switchgear, cables, connections, motors, valve actuators, station batteries, and penetrations are not included and are covered by other IEEE documents. The purpose of this document is to supplement the procedures and requirements given in IEEE Std 323-1974 [24] for type testing Class 1E modules, thereby providing directions for establishment of a type test program which will obtain the required test data and yield the required documentation of test methods and results. This standard is structured to present to the user the principal performance characteristics and environmental parameters which must be considered in designing a type test program for any give Class 1E module. These modules range from tiny sensors to complete racks or cabinets full of equipment that may be located inside or outside containment. The Class 1E modules are required to perform their function before, during, or after, or all, any design basis event specified for the module. The vast variety of modules covered by this document precludes the listing here of specific requirements for each type test

  16. Accuracy and Feasibility of Video Analysis for Assessing Hamstring Flexibility and Validity of the Sit-and-Reach Test

    Science.gov (United States)

    Mier, Constance M.

    2011-01-01

    The accuracy of video analysis of the passive straight-leg raise test (PSLR) and the validity of the sit-and-reach test (SR) were tested in 60 men and women. Computer software measured static hip-joint flexion accurately. High within-session reliability of the PSLR was demonstrated (R greater than 0.97). Test-retest (separate days) reliability for…

  17. Nonlinear modeling, strength-based design, and testing of flexible piezoelectric energy harvesters under large dynamic loads for rotorcraft applications

    Science.gov (United States)

    Leadenham, Stephen; Erturk, Alper

    2014-04-01

    There has been growing interest in enabling wireless health and usage monitoring for rotorcraft applications, such as helicopter rotor systems. Large dynamic loads and acceleration fluctuations available in these environments make the implementation of vibration-based piezoelectric energy harvesters a very promising choice. However, such extreme loads transmitted to the harvester can also be detrimental to piezoelectric laminates and overall system reliability. Particularly flexible resonant cantilever configurations tuned to match the dominant excitation frequency can be subject to very large deformations and failure of brittle piezoelectric laminates due to excessive bending stresses at the root of the harvester. Design of resonant piezoelectric energy harvesters for use in these environments require nonlinear electroelastic dynamic modeling and strength-based analysis to maximize the power output while ensuring that the harvester is still functional. This paper presents a mathematical framework to design and analyze the dynamics of nonlinear flexible piezoelectric energy harvesters under large base acceleration levels. A strength-based limit is imposed to design the piezoelectric energy harvester with a proof mass while accounting for material, geometric, and dissipative nonlinearities, with a focus on two demonstrative case studies having the same linear fundamental resonance frequency but different overhang length and proof mass values. Experiments are conducted at different excitation levels for validation of the nonlinear design approach proposed in this work. The case studies in this work reveal that harvesters exhibiting similar behavior and power generation performance at low excitation levels (e.g. less than 0.1g) can have totally different strength-imposed performance limitations under high excitations (e.g. above 1g). Nonlinear modeling and strength-based design is necessary for such excitation levels especially when using resonant cantilevers with no

  18. A flexible and coherent test/estimation procedure based on restricted mean survival times for censored time-to-event data in randomized clinical trials.

    Science.gov (United States)

    Horiguchi, Miki; Cronin, Angel M; Takeuchi, Masahiro; Uno, Hajime

    2018-04-22

    In randomized clinical trials where time-to-event is the primary outcome, almost routinely, the logrank test is prespecified as the primary test and the hazard ratio is used to quantify treatment effect. If the ratio of 2 hazard functions is not constant, the logrank test is not optimal and the interpretation of hazard ratio is not obvious. When such a nonproportional hazards case is expected at the design stage, the conventional practice is to prespecify another member of weighted logrank tests, eg, Peto-Prentice-Wilcoxon test. Alternatively, one may specify a robust test as the primary test, which can capture various patterns of difference between 2 event time distributions. However, most of those tests do not have companion procedures to quantify the treatment difference, and investigators have fallen back on reporting treatment effect estimates not associated with the primary test. Such incoherence in the "test/estimation" procedure may potentially mislead clinicians/patients who have to balance risk-benefit for treatment decision. To address this, we propose a flexible and coherent test/estimation procedure based on restricted mean survival time, where the truncation time τ is selected data dependently. The proposed procedure is composed of a prespecified test and an estimation of corresponding robust and interpretable quantitative treatment effect. The utility of the new procedure is demonstrated by numerical studies based on 2 randomized cancer clinical trials; the test is dramatically more powerful than the logrank, Wilcoxon tests, and the restricted mean survival time-based test with a fixed τ, for the patterns of difference seen in these cancer clinical trials. Copyright © 2018 John Wiley & Sons, Ltd.

  19. A test facility for the international linear collider at SLAC end station a for prototypes of beam delivery and IR components

    International Nuclear Information System (INIS)

    Hildreth, M.D.; Erickson, R.; Frisch, J.

    2006-01-01

    The SLAC Linac can deliver damped bunches with ILC parameters for bunch charge and bunch length to End Station A. A 10Hz beam at 28.5 GeV energy can be delivered there, parasitic with PEP-II operation. We plan to use this facility to test prototype components of the Beam Delivery System and Interaction Region. We discuss our plans for this ILC Test Facility and preparations for carrying out experiments related to collimator wakefields and energy spectrometers. We also plan an interaction region mockup to investigate effects from backgrounds and beam-induced electromagnetic interference. (author)

  20. Thermal math model analysis of FRSI test article subjected to cold soak and entry environments. [Flexible Reuseable Surface Insulation in Space Shuttle Orbiter

    Science.gov (United States)

    Gallegos, J. J.

    1978-01-01

    A multi-objective test program was conducted at the NASA/JSC Radiant Heat Test Facility in which an aluminum skin/stringer test panel insulated with FRSI (Flexible Reusable Surface Insulation) was subjected to 24 simulated Space Shuttle Orbiter ascent/entry heating cycles with a cold soak in between in the 10th and 20th cycles. A two-dimensional thermal math model was developed and utilized to predict the thermal performance of the FRSI. Results are presented which indicate that the modeling techniques and property values have been proven adequate in predicting peak structure temperatures and entry thermal responses from both an ambient and cold soak condition of an FRSI covered aluminum structure.

  1. Development of a Test Battery to Assess Mental Flexibility Based on Sternberg’s Theory of Successful Intelligence

    Science.gov (United States)

    2008-01-01

    on such tests as the Embedded Figures Test ( EFT ) (Witkin et al., 1971) or the Rod and Frame Test (RFT) (Witkin, Dyk, Faterson, Goodenough, & Karp...one starts to tap sources of individual differences measured little or not at all by such tests. Thus, when assessing intelligence, it is important to...in requiring verbal skills or the ability to analyze one’s own ideas-Sternberg & Lubart, 1995) but also tap skills beyond those measured even by

  2. The Solid Waste Transfer Pit an FFTF [Fast Flux Test Facility] station for fuel and reflector transfer

    International Nuclear Information System (INIS)

    Milewski, A.J.; Thomson, J.D.

    1985-01-01

    This paper describes the design aspects of a proposed FFTF facility called the Solid Waste Transfer Pit (SWTP). This new facility will be used as a transfer station for reflectors and/or low decay heat fuel assemblies when movement from the Fuel Storage Facility for sodium removal and subsequent reprocessing is to be accomplished. The SWTP utilizes a shielded cell cover with an integral manually-operated gate valve for top loading of a transfer vessel. The cost-effective design discussed herein provides a practical approach using state-of-the-art concepts while assuring safe and reliable operation

  3. Workplace flexibility.

    Science.gov (United States)

    Scordato, C; Harris, J

    1990-01-01

    Whether your organization is in a growth pattern or downsizing, you are probably facing change. To gain some insight into your options, here is an in-depth look at the problems and benefits of some flexible work arrangements from a just published study by Catalyst.

  4. Flexibility conflict?

    NARCIS (Netherlands)

    Delsen, L.W.M.; Bauer, F.; Groß, H.; Sieglen, G.

    2002-01-01

    The chapter deals with the presupposed conflict of interests between employers and employees resulting from a decoupling of operating hours and working times. It starts from the notion that both long operating hours and flexibility are relative concepts. As there is some discretion, the ultimate

  5. International Space Station Sustaining Engineering: A Ground-Based Test Bed for Evaluating Integrated Environmental Control and Life Support System and Internal Thermal Control System Flight Performance

    Science.gov (United States)

    Ray, Charles D.; Perry, Jay L.; Callahan, David M.

    2000-01-01

    As the International Space Station's (ISS) various habitable modules are placed in service on orbit, the need to provide for sustaining engineering becomes increasingly important to ensure the proper function of critical onboard systems. Chief among these are the Environmental Control and Life Support System (ECLSS) and the Internal Thermal Control System (ITCS). Without either, life onboard the ISS would prove difficult or nearly impossible. For this reason, a ground-based ECLSS/ITCS hardware performance simulation capability has been developed at NASA's Marshall Space Flight Center. The ECLSS/ITCS Sustaining Engineering Test Bed will be used to assist the ISS Program in resolving hardware anomalies and performing periodic performance assessments. The ISS flight configuration being simulated by the test bed is described as well as ongoing activities related to its preparation for supporting ISS Mission 5A. Growth options for the test facility are presented whereby the current facility may be upgraded to enhance its capability for supporting future station operation well beyond Mission 5A. Test bed capabilities for demonstrating technology improvements of ECLSS hardware are also described.

  6. Space Station galley design

    Science.gov (United States)

    Trabanino, Rudy; Murphy, George L.; Yakut, M. M.

    1986-01-01

    An Advanced Food Hardware System galley for the initial operating capability (IOC) Space Station is discussed. Space Station will employ food hardware items that have never been flown in space, such as a dishwasher, microwave oven, blender/mixer, bulk food and beverage dispensers, automated food inventory management, a trash compactor, and an advanced technology refrigerator/freezer. These new technologies and designs are described and the trades, design, development, and testing associated with each are summarized.

  7. National Seismic Station

    International Nuclear Information System (INIS)

    Stokes, P.A.

    1982-06-01

    The National Seismic Station was developed to meet the needs of regional or worldwide seismic monitoring of underground nuclear explosions to verify compliance with a nuclear test ban treaty. The Station acquires broadband seismic data and transmits it via satellite to a data center. It is capable of unattended operation for periods of at least a year, and will detect any tampering that could result in the transmission of unauthentic seismic data

  8. UMTS Network Stations

    Science.gov (United States)

    Hernandez, C.

    2010-09-01

    over the 30 radiometric stations. As a the result, currently it exist a stable, flexible, safe and economic infrastructure of radiometric stations and telecommunications that allows, on the one hand, to have data in real time from all 30 remote weather stations, and on the other hand allows to communicate with them in order to reprogram them and to carry out maintenance works.

  9. Flexible licensing

    Directory of Open Access Journals (Sweden)

    Martyn Jansen

    2012-07-01

    Full Text Available The case is presented for a more flexible approach to licensing online library resources. Today's distributed education environment creates pressure for UK higher and further education institutions (HEI/FEIs to form partnerships and to develop educational products and roll them out across the globe. Online library resources are a key component of distributed education and yet existing licensing agreements struggle to keep pace with the increasing range of users and purposes for which they are required. This article describes the process of developing a flexible approach to licensing and proposes a new model licence for online library resources which has the adaptability needed in this new global educational landscape. These ideas have been presented and discussed at various workshops across Eduserv's and JISC Collections' higher education and publisher communities, and further consultation is ongoing.

  10. Evaluation of the expected moments algorithm and a multiple low-outlier test for flood frequency analysis at streamgaging stations in Arizona

    Science.gov (United States)

    Paretti, Nicholas V.; Kennedy, Jeffrey R.; Cohn, Timothy A.

    2014-01-01

    Flooding is among the costliest natural disasters in terms of loss of life and property in Arizona, which is why the accurate estimation of flood frequency and magnitude is crucial for proper structural design and accurate floodplain mapping. Current guidelines for flood frequency analysis in the United States are described in Bulletin 17B (B17B), yet since B17B’s publication in 1982 (Interagency Advisory Committee on Water Data, 1982), several improvements have been proposed as updates for future guidelines. Two proposed updates are the Expected Moments Algorithm (EMA) to accommodate historical and censored data, and a generalized multiple Grubbs-Beck (MGB) low-outlier test. The current guidelines use a standard Grubbs-Beck (GB) method to identify low outliers, changing the determination of the moment estimators because B17B uses a conditional probability adjustment to handle low outliers while EMA censors the low outliers. B17B and EMA estimates are identical if no historical information or censored or low outliers are present in the peak-flow data. EMA with MGB (EMA-MGB) test was compared to the standard B17B (B17B-GB) method for flood frequency analysis at 328 streamgaging stations in Arizona. The methods were compared using the relative percent difference (RPD) between annual exceedance probabilities (AEPs), goodness-of-fit assessments, random resampling procedures, and Monte Carlo simulations. The AEPs were calculated and compared using both station skew and weighted skew. Streamgaging stations were classified by U.S. Geological Survey (USGS) National Water Information System (NWIS) qualification codes, used to denote historical and censored peak-flow data, to better understand the effect that nonstandard flood information has on the flood frequency analysis for each method. Streamgaging stations were also grouped according to geographic flood regions and analyzed separately to better understand regional differences caused by physiography and climate. The B

  11. Friction coefficient and limiter load test analysis by flexibility coefficient model of Hold-Down Spring of nuclear reactor vessel internals

    Energy Technology Data Exchange (ETDEWEB)

    Xie, Linjun [Zhejiang Univ. of Technology, Hangzhou (China). College of Mechanical Engineering; Xue, Guohong; Zhang, Ming [Shanghai Nuclear Engineering Research and Design Institute, Shanghai (China)

    2017-11-15

    The friction force between the contact surfaces of a reactor internal hold-down spring (HDS) and core barrel flanges can directly influence the axial stiffness of an HDS. However, friction coefficient cannot be obtained through theoretical analysis. This study performs a mathematical deduction of the physical model of an HDS. Moreover, a mathematical model of axial load P, displacement δ, and flexibility coefficient is established, and a set of test apparatuses is designed to simulate the preloading process of the HDS. According to the experimental research and theoretical analysis, P-δ curves and the flexibility coefficient λ are obtained in the loading processes of the HDS. The friction coefficient f of the M1000 HDS is further calculated as 0.224. The displacement limit load value (4,638 kN) can be obtained through a displacement limit experiment. With the friction coefficient considered, the theoretical load is 4,271 kN, which is relatively close to the experimental result. Thus, the friction coefficient exerts an influence on the displacement limit load P. The friction coefficient should be considered in the design analysis for HDS.

  12. Friction coefficient and limiter load test analysis by flexibility coefficient model of Hold-Down Spring of nuclear reactor vessel internals

    International Nuclear Information System (INIS)

    Xie, Linjun

    2017-01-01

    The friction force between the contact surfaces of a reactor internal hold-down spring (HDS) and core barrel flanges can directly influence the axial stiffness of an HDS. However, friction coefficient cannot be obtained through theoretical analysis. This study performs a mathematical deduction of the physical model of an HDS. Moreover, a mathematical model of axial load P, displacement δ, and flexibility coefficient is established, and a set of test apparatuses is designed to simulate the preloading process of the HDS. According to the experimental research and theoretical analysis, P-δ curves and the flexibility coefficient λ are obtained in the loading processes of the HDS. The friction coefficient f of the M1000 HDS is further calculated as 0.224. The displacement limit load value (4,638 kN) can be obtained through a displacement limit experiment. With the friction coefficient considered, the theoretical load is 4,271 kN, which is relatively close to the experimental result. Thus, the friction coefficient exerts an influence on the displacement limit load P. The friction coefficient should be considered in the design analysis for HDS.

  13. Valve stem packing seal test results for primary heat transport system conditions in Canadian nuclear generating stations

    International Nuclear Information System (INIS)

    Dixon, D.F.; Farrell, J.M.; Coutinho, R.F.

    1978-06-01

    Valve stem packing tests were done to obtain performance data on packing already in CANDU-PHW reactor service and on alternative packings. Most of the tests were replicated. Results are presented for ten packings tested under two stem cycle modes; leakage, packing consolidation and packing friction were the main responses. Packing tests were performed with water at close to CANDU-PHW reactor primary heat transport (PHT) system conditions (288 deg C and 10 MPa), but without ionizing radiation. The test rigs had rising, rotating stems. Stuffing box dimensions were typical of a standard Velan valve; packings were spring loaded to control applied packing stress

  14. Flexible metal bellows

    CERN Multimedia

    CERN PhotoLab

    1975-01-01

    A set of flexible metal bellows being fatigue-tested by repeated offset motion. Such bellows assemblies were used in the SPS vacuum system at places where , for instance, beam stoppers and collimators had to be moved frequently in and out of the beam path.

  15. Método integral configurable y flexible de ensayo de materiales consumibles de soldadura por arco eléctrico. // Integral, flexible and shaped method for electric arc welding consumable materials test.

    Directory of Open Access Journals (Sweden)

    A. García Rodríguez

    2005-05-01

    Full Text Available La presente publicación propone un método integral configurable y flexible para facilitar el ensayo de materialesconsumibles de soldadura por arco eléctrico en las condiciones tecnológicas para las que han sido diseñados estosmateriales, en relación a la calidad de la unión soldada. Se puede llegar a conclusiones definitivas sobre la calidad de lasoldadura usando un determinado material consumible mediante: la relación operacional de técnicas de inteligencia naturaly/o artificial, el uso de sistemas expertos, el trabajo con bases de datos, la simulación y la realización práctica del procesomientras se registran ciertos parámetros del arco eléctrico, digitalmente procesados estadísticamente y relacionados a losresultados de la caracterización de la unión soldada. El método permite registrar adecuadamente la información referente acada aspecto del proceso exigida en los procesos de certificación de la calidad de los consumibles, así como en lainvestigación dirigida a optimizar la composición química y las propiedades físicas de un material, para obtener calidadesóptimas en un determinado proceso; además es posible obtener las bases de datos de parámetros del arco eléctrico útilespara investigar, desarrollar y valorar métodos y algoritmos para el monitoreo en tiempo real de la calidad de la soldaduradurante un determinado proceso tecnológico de soldadura con arco eléctrico.Palabras Clave: Ensayo, materiales, soldadura, arco eléctrico, estabilidad, calidad, simulación, optimización,unión soldada.___________________________________________________________________________Abstract.This paper presenst an integral, flexible and shaped method that make easy the electric arc welding consumable materials test at thedesigned technological conditions, related to the quality of the welding joint. It is possible to arrive to definitive conclusions about thewelding quality using a fixed material through: operational

  16. Station Capacity

    DEFF Research Database (Denmark)

    Landex, Alex

    2011-01-01

    the probability of conflicts and the minimum headway times into account. The last method analyzes how optimal platform tracks are used by examining the arrival and departure pattern of the trains. The developed methods can either be used separately to analyze specific characteristics of the capacity of a station......Stations are often limiting the capacity of railway networks. This is due to extra need of tracks when trains stand still, trains turning around, and conflicting train routes. Although stations are often the capacity bottlenecks, most capacity analysis methods focus on open line capacity. Therefore...... for platform tracks and the probability that arriving trains will not get a platform track immediately at arrival. The third method is a scalable method that analyzes the conflicts in the switch zone(s). In its simplest stage, the method just analyzes the track layout while the more advanced stages also take...

  17. Comparison Between Stress Obtained by Numerical Analysis and In-Situ Measurements on a Flexible Pipe Subjected to In-Plane Bending Test

    DEFF Research Database (Denmark)

    Vestergaard Lukassen, Troels; Glejbøl, Kristian; Lyckegaard, Anders

    2016-01-01

    to stress patterns obtained during in-situ OMS measurements carried out during an actual experimental inplane bending test. The study showed a good correlation between the stress variation predicted with the finite element model and the measured stress variation.......To predict the lifetime and long-term properties of tensile armour wires in a dynamically loaded pipe, it is essential to have a tool which allows detailed prediction of the stress variations in the tensile armour wires during global pipe loading. Furthermore, detailed understanding of the stress...... variations will allow for performance optimization of the armour layers. To study the detailed stress variations in flexible pipes during dynamic loading, a comprehensive three-dimensional implicit nonlinear finite element model has been developed. The predicted numerical stress variations will be compared...

  18. Shippingport Station Decommissioning Project

    International Nuclear Information System (INIS)

    McKernan, M.L.

    1989-01-01

    The Shippingport Atomic Power Station was located on the Ohio River in Shippingport Borough (Beaver County), Pennsylvania, USA. The US Atomic Energy Commission (AEC) constructed the plant in the mid-1950s on a seven and half acre parcel of land leased from Duquesne Light Company (DLC). The purposes were to demonstrate and to develop Pressurized Water Recovery technology and to generate electricity. DLC operated the Shippingport plant under supervision of (the successor to AEC) the Department of Energy (DOE)-Naval Reactors (NR) until operations were terminated on October 1, 1982. NR concluded end-of-life testing and defueling in 1984 and transferred the Station's responsibility to DOE Richland Operations Office (RL), Surplus Facility Management Program Office (SFMPO5) on September 5, 1984. SFMPO subsequently established the Shippingport Station Decommissioning Project and selected General Electric (GE) as the Decommissioning Operations Contractor. This report is intended to provide an overview of the Shippingport Station Decommissioning Project

  19. The Cryogenic Test Bed experiments: Cryogenic heat pipe flight experiment CRYOHP (STS-53). Cryogenic two phase flight experiment CRYOTP (STS-62). Cryogenic flexible diode flight experiment CRYOFD

    Science.gov (United States)

    Thienel, Lee; Stouffer, Chuck

    1995-09-01

    This paper presents an overview of the Cryogenic Test Bed (CTB) experiments including experiment results, integration techniques used, and lessons learned during integration, test and flight phases of the Cryogenic Heat Pipe Flight Experiment (STS-53) and the Cryogenic Two Phase Flight Experiment (OAST-2, STS-62). We will also discuss the Cryogenic Flexible Diode Heat Pipe (CRYOFD) experiment which will fly in the 1996/97 time frame and the fourth flight of the CTB which will fly in the 1997/98 time frame. The two missions tested two oxygen axially grooved heat pipes, a nitrogen fibrous wick heat pipe and a 2-methylpentane phase change material thermal storage unit. Techniques were found for solving problems with vibration from the cryo-collers transmitted through the compressors and the cold heads, and mounting the heat pipe without introducing parasitic heat leaks. A thermally conductive interface material was selected that would meet the requirements and perform over the temperature range of 55 to 300 K. Problems are discussed with the bi-metallic thermostats used for heater circuit protection and the S-Glass suspension straps originally used to secure the BETSU PCM in the CRYOTP mission. Flight results will be compared to 1-g test results and differences will be discussed.

  20. Electrolyzers Enhancing Flexibility in Electric Grids

    Directory of Open Access Journals (Sweden)

    Manish Mohanpurkar

    2017-11-01

    Full Text Available This paper presents a real-time simulation with a hardware-in-the-loop (HIL-based approach for verifying the performance of electrolyzer systems in providing grid support. Hydrogen refueling stations may use electrolyzer systems to generate hydrogen and are proposed to have the potential of becoming smarter loads that can proactively provide grid services. On the basis of experimental findings, electrolyzer systems with balance of plant are observed to have a high level of controllability and hence can add flexibility to the grid from the demand side. A generic front end controller (FEC is proposed, which enables an optimal operation of the load on the basis of market and grid conditions. This controller has been simulated and tested in a real-time environment with electrolyzer hardware for a performance assessment. It can optimize the operation of electrolyzer systems on the basis of the information collected by a communication module. Real-time simulation tests are performed to verify the performance of the FEC-driven electrolyzers to provide grid support that enables flexibility, greater economic revenue, and grid support for hydrogen producers under dynamic conditions. The FEC proposed in this paper is tested with electrolyzers, however, it is proposed as a generic control topology that is applicable to any load.

  1. A programming system for a modular, flexible multicomputer system for the automatic control of automated test equipment

    International Nuclear Information System (INIS)

    Schmidt, J.

    1984-11-01

    The hardware used is operationally directed, consisting of largely self-functioning, micro-computing modules, combined together over a parallel systembus. For communication purposes between the modules and to synchronize their activities a multi microcomputing operating system is being developed which corresponds to the specific demands of computerized process-control (handling of real-word events under real-time conditions and operation of several parallel-running subprocesses). In order to program the user-specific test cycles a programming language has to be made available which can be coordinated with the operational range of specific test equipment in terms of commands and syntax and which can also easily be learned by operators having no specialised knowledge of data processing. With this objective in mind, a structural system is developed in this work, by the aid of which application-oriented programming languages can be implemented. The adaption of the programming system to a wide spectrum of applications in automatic testing is facilitated by its modular structure. The efficiency of the system is demonstrated by means of an industrial pilot-scale implementation. (orig./HP) [de

  2. Flexible Consumption

    DEFF Research Database (Denmark)

    Holm Jacobsen, Peter; Pallesen, Trine

    This report presents the first findings from our qualitative study of consumer behaviour vis-à-vis flexible consumption. The main of objective of this report is to present our first round of data from Bornholm, and to assist the design of products/services designed in WP6. In the report, we adopt...... the perspective of the consumer: what does living in a demand response setup look like to participants – and what kinds of behaviour and interest motivate – and emerge from – their participation in EcoGrid 2.0....

  3. Flexible Capitalism

    DEFF Research Database (Denmark)

    Approaching “work” as at heart a practice of exchange, this volume explores sociality in work environments marked by the kind of structural changes that have come to define contemporary “flexible” capitalism. It introduces anthropological exchange theory to a wider readership, and shows how...... the perspective offers new ways to enquire about the flexible capitalism’s social dimensions. The essays contribute to a trans-disciplinary scholarship on contemporary economic practice and change by documenting how, across diverse settings, “gift-like” socialities proliferate, and even sustain the intensified...

  4. The J-resistance curve Leak-before-Break test program on material for the Darlington Nuclear Generating Station

    International Nuclear Information System (INIS)

    Mukherjee, B.

    1988-01-01

    The Darlington Leak-Before-Break (DLBB) approach has been developed for large diameter (21, 22, 24 inch) SA106B heat transport (HT) piping and SA105 fittings as a design alternative to pipewhip restraints and in recognition of the questionable benefits of providing such restraints. Ontario Hydro's DLBB approach is based on the elastic plastic fracture mechanics method. In this test program, J-resistance curves were determined from actual pipe heats that were used in the construction of the Darlington heat transport systems (Units 1 and 2). Test blocks were prepared using four different welding procedures for nuclear Class I piping. The test program was designed to take into account the effect of various factors such as test temperature, crack plane orientation, welding effects, etc., which have influence on fracture properties. A total of 91 tests were conducted. An acceptable lower bound J-resistance curve for the piping steels was obtained by machining maximum thickness specimens from the pipes and by testing side grooved compact tension specimens. Test results showed that all pipes, welds and heat-affected zone materials within the scope of the DLBB program exhibited uppershelf toughness behaviour. All specimens showed high crack initiation toughness Jsub(lc), rising J-resistance curve and stable and ductile crack extension. Toughness of product forms depended on the direction of crack extension (circumferential versus axial crack orientation). Toughness of DLBB welds and parent materials at 250 0 C was lower than that at 20 0 C. (author)

  5. Microbial Challenge Testing of Single Liquid Cathode Feed Water Electrolysis Cells for the International Space Station (ISS) Oxygen Generator Assembly (OGA)

    Science.gov (United States)

    Roy, Robert J.; Wilson, Mark E.; Diderich, Greg S.; Steele, John W.

    2011-01-01

    The International Space Station (ISS) Oxygen Generator Assembly (OGA) operational performance may be adversely impacted by microbiological growth and biofilm formation over the electrolysis cell membranes. Biofilms could hinder the transport of water from the bulk fluid stream to the membranes and increase the cell concentration overpotential resulting in higher cell voltages and a shorter cell life. A microbial challenge test was performed on duplicate single liquid-cathode feed water electrolysis cells to evaluate operational performance with increasing levels of a mixture of five bacteria isolated from ISS and Space Shuttle potable water systems. Baseline performance of the single water electrolysis cells was determined for approximately one month with deionized water. Monthly performance was also determined following each inoculation of the feed tank with 100, 1000, 10,000 and 100,000 cells/ml of the mixed suspension of test bacteria. Water samples from the feed tank and recirculating water loops for each cell were periodically analyzed for enumeration and speciation of bacteria and total organic carbon. While initially a concern, this test program has demonstrated that the performance of the electrolysis cell is not adversely impacted by feed water containing the five species of bacteria tested at a concentration measured as high as 1,000,000 colony forming units (CFU)/ml. This paper presents the methodologies used in the conduct of this test program along with the performance test results at each level of bacteria concentration.

  6. Comparação entre dois testes clínicos para avaliar a flexibilidade dos músculos posteriores da coxa Comparison between two clinical tests for evaluating the flexibility of the posterior muscles of the thigh

    Directory of Open Access Journals (Sweden)

    RL Carregaro

    2007-04-01

    -examiner reliability of the photogrammetric analysis procedure. METHOD: The tests were applied to 35 healthy male subjects (mean age 23 ± 3.4 years, height 170 ± 4 cm and weight 68 ± 11 kg. The subjects were divided into two groups on the basis of the test classifications. Surface markers were placed on bone references in order to calculate the hip, thoracolumbar, leg, knee and tibiotarsal angles. The reliability of the photogrammetric analysis procedure on the angles measured by two examiners was tested. RESULTS: For the hip angle, there were significant differences between the flexibility groups in both tests, and subjects with reduced flexibility had lower angles. There was a significant difference (22.8% between the classifications designated by the two tests. However, the hip angle showed high levels of concordance between the tests (ICC: 0.89 and mean difference of -0.85º. The photogrammetric procedures presented high reliability rates, both for intra and inter-examiner (ICC ranging from 0.94 to 0.99. CONCLUSION: The tests presented differences in the classification of the subjects' flexibility. However, considering the hip angle, there was high concordance between the test results. The photogrammetric analysis procedures were reproducible, both for intra and for inter-examiner measurements, thus making this a useful analysis tool for the tests in question.

  7. Flexible nanovectors

    International Nuclear Information System (INIS)

    Pugno, Nicola M

    2008-01-01

    In this paper we show that the control of adhesion in highly flexible (a property that could be crucial for smart drug delivery but which is still ignored in the literature) nanovectors can help in smartly targeting and delivering the drug. The existence of and the conditions for activating and controlling a super-adhesive state are addressed. Even if such a state has never been observed in nanovectors, our calculations, as well as observations in spiders and geckos, suggest its existence and feasible control. Control of the competition between the drag and the adhesive force is exploited to improve the targeting ability and a hierarchical model is applied to describe a real vasculature. The high flexibility of the nanovector is used to smartly deliver the drug only during adhesion by nanopumping or, as a limiting case, by the new concept of 'adhesion induced nanovector implosion'; a liquid drop analogy is utilized for the calculations. Fast (pumping) and slow (diffusion) drug deliveries can thus be separately controlled by controlling the size and shape of the nanovector. Multiple stage nanovectors are also briefly discussed, mimicking aerospace vector strategies.

  8. Flexible nanovectors

    Science.gov (United States)

    Pugno, Nicola M.

    2008-11-01

    In this paper we show that the control of adhesion in highly flexible (a property that could be crucial for smart drug delivery but which is still ignored in the literature) nanovectors can help in smartly targeting and delivering the drug. The existence of and the conditions for activating and controlling a super-adhesive state are addressed. Even if such a state has never been observed in nanovectors, our calculations, as well as observations in spiders and geckos, suggest its existence and feasible control. Control of the competition between the drag and the adhesive force is exploited to improve the targeting ability and a hierarchical model is applied to describe a real vasculature. The high flexibility of the nanovector is used to smartly deliver the drug only during adhesion by nanopumping or, as a limiting case, by the new concept of 'adhesion induced nanovector implosion'; a liquid drop analogy is utilized for the calculations. Fast (pumping) and slow (diffusion) drug deliveries can thus be separately controlled by controlling the size and shape of the nanovector. Multiple stage nanovectors are also briefly discussed, mimicking aerospace vector strategies.

  9. Small zeolite column tests for removal of cesium from high radioactive contaminated water in Fukushima Daiichi Nuclear Power Station

    International Nuclear Information System (INIS)

    Hijikata, Takatoshi; Uozumi, Koichi; Tukada, Takeshi; Koyama, Tadafumi; Ishikawa, Keiji; Ono, Shoichi; Suzuki, Shunichi; Denton, Mark; Raymont, John

    2011-01-01

    After the earthquake on March 11th 2011, a large amount (more than 0.12 million m 3 ) of highly radioactive contaminated water had pooled in Fukushima Daiichi nuclear power station. As an urgent issue, highly radioactive nuclides should be removed from this contaminated water to reduce radioactivity in the turbine buildings and nuclear reactor buildings. Removal of Cs from this contaminated water is a key issue, because 134 Cs and 137 Cs are highly radioactive γ-emitting nuclides. The zeolite column system was used for Cs and Sr removal from the radioactive water of Three-Mile Island Unit 2, and modified columns were then developed as a Cs removal method for high-level radioactive water in US national laboratories (WRSC, ORNL, PNNL, Hanford, etc.). In order to treat Fukushima's highly contaminated water with a similar system, it was necessary to understand the properties of zeolite to remove Cs from sea salt as well as the applicability of the column system to a high throughput of around 1200 m 3 /d. The kinetic characteristics of the column were another property to be understood before actual operation. Hence, a functional small-scale zeolite column system was installed in CRIEPI for conducting the experiments to understand decontamination behaviors. Each column has a 2- or 3-cm inner diameter and a 12-cm height, and 12 g of zeolite-type media was packed into the column. The column experiments were carried out with Kurion-zeolite, Herschelite, at different feed rates of simulated water with different concentrations of Cs and sea salt. As for the water with 4 ppm Cs and 0 ppm sea salt, only a 10% Cs concentration was observed in the effluent after 20,000 bed volumes were fed at a rate of 33 cm/min, which corresponds to the actual system. On the other hand, a 40% Cs concentration was observed in the effluent after only 50 bed volumes were passed for water with 2 ppm Cs and 3.4 wt.% sea salt at a feed rate of 34 cm/min. As the absorption of Cs is hampered by the

  10. Validation of long-range scanning lidars deployed around the Høvsøre Test Station

    DEFF Research Database (Denmark)

    Lea, Guillaume; Courtney, Michael

    This report describes validation tests performed on the long-range scanning lidars prior to deployment in the RUNE campaign. Position and speed accuracy tests have been performed at a range of 5km from the Høvsøre met mast. This range is typical of ranges for near-coastal resource measurements....... The accuracy of the beam positioning was checked by comparing the predicted position to the position found from hard-target returns from the mast. Radial speeds measured by the lidar were also found to be in close agreement with the mast measured wind speeds projected in the line of sight direction....

  11. BWR reactor water cleanup system flexible wedge gate isolation valve qualification and high energy flow interruption test

    International Nuclear Information System (INIS)

    DeWall, K.G.; Steele, R. Jr.

    1989-10-01

    This report presents the results of research performed to develop technical insights for the NRC effort regarding Generic Issue 87, ''Failure of HPCI Steam Line Without Isolation.'' Volume III of this report contains the data and findings from the original research performed to assess the qualification of the valves and reported in EGG-SSRE-7387, ''Qualification of Valve Assemblies in High Energy BWR Systems Penetrating Containment.'' We present the original work here to complete the documentation trail. The recommendations contained in Volume III of this report resulted in the test program described in Volume I and II. The research began with a survey to characterize the population of normally open containment isolation valves in those process lines that connect to the primary system and penetrate containment. The qualification methodology used by the various manufacturers identified in the survey is reviewed and deficiencies in that methodology are identified. Recommendations for expanding the qualification of valve assemblies for high energy pipe break conditions are presented. 11 refs., 1 fig., 2 tabs

  12. Physical degradation assessment of generator station cables

    International Nuclear Information System (INIS)

    Stonkus, D.J.

    1988-01-01

    Preliminary studies of fossil-fired and nuclear generator station cables indicate that the low voltage PVC insulated cables are in relatively good condition. The insulation is flexible and in the case of nuclear cables can withstand a design basis event after nearly 15 years of service. Cables insulated with styrene butadiene rubber have been found embrittled and cables insulated with SBR should be closely inspected in any plant assurance program. Thermal analysis using oxidative induction technique shows promise to indicate cable insulation degradation. Long term reliability assurance and plant life extension studies are being actively pursued at Ontario Hydro. A major study is currently underway to extend the life of the oldest operating fossil-fuel station, the 8-unit, 2400 MW Lakeview TGS in operation since the 1960s. Plant life assurance programs have been initiated at the 2000 MW Lambton TGS in operation since 1969, and for the oldest operating nuclear plant, Pickering NGS A in operation since the early 1970s. As cables are considered one of the critical components in a generator station due to the extreme difficulty and cost of cable replacement, test programs have been initiated to evaluate the physical degradation of the cables and relate the results to electrical diagnostic tests and to chemical changes. The decommissioning of two small nuclear stations, the 20 MW Nuclear Power Demonstration (NPD) and the 200 MW Douglas Point NGS, which were placed in service in 1962 and 1967 respectively, will provide an opportunity to perform destructive electrical and physical evaluation on field aged cables

  13. Method of 16N generation for test of radiation controlled channels at nuclear power stations with water-cooled reactors

    International Nuclear Information System (INIS)

    Khryachkov, V.A.; Bondarenko, I.P.; Dvornikov, P.A.; Zhuravlev, B.V.; Kovtun, S.N.; Khromyleva, T.A.; Pavlov, A.V.; Roshchin, N.G.

    2012-01-01

    The preferences of nuclear reaction use for radiation control channels test in water-cooled power reactors have been analyzed in the paper. The new measurements for more accurate determination of reaction cross section energy dependence have been carried out. A set of new methods for background reducing and improvement of events determination reliability has also been developed [ru

  14. The Cyborg Astrobiologist: testing a novelty detection algorithm on two mobile exploration systems at Rivas Vaciamadrid in Spain and at the Mars Desert Research Station in Utah

    Science.gov (United States)

    McGuire, P. C.; Gross, C.; Wendt, L.; Bonnici, A.; Souza-Egipsy, V.; Ormö, J.; Díaz-Martínez, E.; Foing, B. H.; Bose, R.; Walter, S.; Oesker, M.; Ontrup, J.; Haschke, R.; Ritter, H.

    2010-01-01

    In previous work, a platform was developed for testing computer-vision algorithms for robotic planetary exploration. This platform consisted of a digital video camera connected to a wearable computer for real-time processing of images at geological and astrobiological field sites. The real-time processing included image segmentation and the generation of interest points based upon uncommonness in the segmentation maps. Also in previous work, this platform for testing computer-vision algorithms has been ported to a more ergonomic alternative platform, consisting of a phone camera connected via the Global System for Mobile Communications (GSM) network to a remote-server computer. The wearable-computer platform has been tested at geological and astrobiological field sites in Spain (Rivas Vaciamadrid and Riba de Santiuste), and the phone camera has been tested at a geological field site in Malta. In this work, we (i) apply a Hopfield neural-network algorithm for novelty detection based upon colour, (ii) integrate a field-capable digital microscope on the wearable computer platform, (iii) test this novelty detection with the digital microscope at Rivas Vaciamadrid, (iv) develop a Bluetooth communication mode for the phone-camera platform, in order to allow access to a mobile processing computer at the field sites, and (v) test the novelty detection on the Bluetooth-enabled phone camera connected to a netbook computer at the Mars Desert Research Station in Utah. This systems engineering and field testing have together allowed us to develop a real-time computer-vision system that is capable, for example, of identifying lichens as novel within a series of images acquired in semi-arid desert environments. We acquired sequences of images of geologic outcrops in Utah and Spain consisting of various rock types and colours to test this algorithm. The algorithm robustly recognized previously observed units by their colour, while requiring only a single image or a few images to

  15. Ultimate storage of spent fuel elements of the AVR test power station in the Asse salt mine

    International Nuclear Information System (INIS)

    Wolf, J.

    1975-02-01

    With regard to the ultimate storage of irradiated AVR pebble-bed reactor carbide fuel elements in the saline of Asse, a number of tests and calculations are presented to demonstrate that there is no credible possibility of the MCA (maximum credible accident) defined for the saline. The safety of persons is not threatened during the operation of spent fuel storage nor at any later time (extrapolation up to approx. 1,000 years after storage). 1,000 fuel elements at a time are packed up in gas-tight containers which are stacked in boreholes. The boreholes are then sealed with concrete. Lay-out and functions of the special airlock and transportation systems - from the packing of the containers in a hot cell to the final storage in the borehole - are described with special reference to aspects of the safety of the overall procedure. The possible accidents in the mine are discussed in detail. 85 Kr and T release rates are determined in laboratory tests by heating of the spherical fuel elements. Tests with fuel elements embedded in salt or stagnant brine were carried out at varies temperatures to investigate their behaviour in final storage. Kr and T release, extraction of fission products, mechanical resistance and corrosion were examined in these tests. Finally, the permeability of salt and salt concrete to radioactive gases were investigated in a special experimental arrangement. The diffusion and permeability coefficients obtained for 85 Kr, HT and HTO allow an estimation of the gas discharge of the stored fuel element. (RB/AK) [de

  16. Structural integrity test of Indian PHWR containment of Kaiga- 1 and 2 and RAPS- 3 and 4 atomic power stations

    International Nuclear Information System (INIS)

    Samota, Arun; Verma, U.S.P.; Warudkar, A.S.; Mohan, Nalini; Bhawal, R.N.; Bajaj, S.S.

    2002-01-01

    Full text: The structural integrity tests of Kaiga 1, 2 and RAPS 3, 4 primary containment were carried out as per requirements specified in RCC-G code by pressurizing the containment with oil free air at design pressure of 1.73 Kg/cm 2 (g). Dilations were monitored in vertical and radial directions by installing dial gauges at various locations on the outer surface of primary containment. The dilations were generally observed to be linear with the pressure and the residual displacements were within the acceptable limit. Strains were measured in meridional and circumferential directions at different pressure levels by using a large number of different types of strain gauge. While the behaviour of embedded type vibrating wire strain gauges was excellent, the behaviour of surface mounted electrical resistance (SMER) was satisfactory. Other parameters monitored were crack, differential and absolute settlements. No crack was noticed in any of the containment. No absolute and differential settlements were noticed. The results of the tests have demonstrated elastic behaviour of the containment. The acceptance criteria of the tests were met with good margin

  17. Power stations

    International Nuclear Information System (INIS)

    Cawte, H.; Philpott, E.F.

    1980-01-01

    The object is to provide a method of operating a dual purpose power station so that the steam supply system is operated at a high load factor. The available steam not required for electricity generation is used to provide process heat and the new feature is that the process plant capacity is determined to make the most economic use of the steam supply system, and not to match the passout capacity of the turbine of the turbogenerator. The product of the process plant should, therefore, be capable of being stored. A dual-purpose power station with a nuclear-powered steam source, turbogenerating means connected to the steam source and steam-powered process plant susceptible to wide variation in its rate of operation is described. (U.K.)

  18. Confirmation test on the dynamic interaction between a model reactor-building foundation and ground in the Sendai Nuclear Power Station

    International Nuclear Information System (INIS)

    Umezu, Hideo; Kisaki, Noboru; Shiota, Mutsumi

    1982-01-01

    On the site of unit 2 (planned) in the Sendai Nuclear Power Station, a model reactor-building foundation of reinforced concrete with diameter of 12 m and height of 5 m was installed. With a vibration generator, its forced vibration tests were carried out in October to December, 1980. Valuable data were able to be obtained on the dynamic interaction between the model foundation and the ground, and also the outlook for the application of theories in hard base rock was obtained. (1) The resonance frequency of the model foundation in horizontal vibration was 35 Hz in both NS and EW directions. (2) Remarkable difference was not observed in the horizontal vibration behavior between NS and EW directions, so that there is not anisotropy in the ground. (3) The model foundation was deformed nearly as a rigid body. (J.P.N.)

  19. Study of the mechanical properties of the electric power station components: the punch test; Etude des proprietes mecaniques des composants de centrales thermiques: l'essai punch test

    Energy Technology Data Exchange (ETDEWEB)

    Isselin, J

    2003-03-15

    The aging of the electric production park implies an increasing need of knowledge concerning the evolution of the mechanical properties of its components. With regard to this problem, the availability in material is more and more small. This work proposes to characterize these properties through a mechanical test called Punch test. The main characteristic of this test is to use very small volume samples. The development of this test has been carried out by the study of a 15 MDV 4-05 steel coming from a steam drum of a thermal power plant after 145000 hours of service. At first, we have measured the influence of the parameters of this test. Then, the study has dealt more particularly on the transition temperature of the material. With the finite element simulation method, the strain hardening coefficient of the material has been determined. (O.M.)

  20. Uranium from Seawater Marine Testing Program at the University of Miami’s Broad Key Island Research Station

    Energy Technology Data Exchange (ETDEWEB)

    Gill, Gary A. [Pacific Northwest National Lab. (PNNL), Sequim, WA (United States). Marine Sciences Lab.; Kuo, Li-Jung [Pacific Northwest National Lab. (PNNL), Sequim, WA (United States). Marine Sciences Lab.; Strivens, Jonathan E. [Pacific Northwest National Lab. (PNNL), Sequim, WA (United States). Marine Sciences Lab.; Wood, Jordana R. [Pacific Northwest National Lab. (PNNL), Sequim, WA (United States). Marine Sciences Lab.; Schlafer, Nicholas J. [Pacific Northwest National Lab. (PNNL), Sequim, WA (United States). Marine Sciences Lab.; D' Alessandro, Evan [Univ. of Miami, FL (United States). Rosensteil School of Marine and Atmospheric Sciences

    2016-09-30

    Marine testing at Broad Key Island (BKI), Florida was conducted to validate adsorption capacity and adsorption kinetics results obtained for several formulations of the ORNL amidoxime-based polymeric adsorbents in Sequim Bay, Washington in another location with different oceanographic and water quality conditions (e.g. temperature, dissolved organic carbon, salinity and trace element content). Broad Key is a small island off the southeast coast of Florida at the southern end of Biscayne Bay. Flow-through column and recirculating flume experiments were conducted at BKI using ambient filtered seawater and identical exposure systems as were used at the Pacific Northwest National Laboratory’s (PNNL) Marine Sciences laboratory (MSL). Testing was conducted in two periods in FY 2015 and FY 2016 with five different amidoxime-based adsorbent materials, four produced by ORNL (AF1, AI8, AF8, and AF1-DMSO) and one by LCW technologies (LCW-10). All exposures were conducted at ambient seawater temperatures, with moderate temperature control on the ambient seawater to mitigate large daily swings in the seawater temperature. The ORNL adsorbents AF1, AI8 and AF1-AO-DMSO all had fairly similar adsorption capacities (6.0 to 6.6 g U/ kg adsorbent) after 56 days of exposure at ambient temperature (26 to 31 °C) and salinity (35.7 to 37.4), but the AF8 adsorbent was considerably lower at 4.4 g U/kg adsorbent. All the adsorbents tested at BKI had higher capacities than was observed at PNNL, with the higher temperatures likely a major factor contributing to this difference. In general, the elemental distribution (expressed as a relative percentage) on all the adsorbents agreed well, including good agreement with the elemental distribution pattern for AF1 adsorbent exposed at PNNL. The most notable exception to a uniform elemental distributional pattern across the various adsorbents occurs with vanadium. The relative mass percentage for vanadium retained by the adsorbents ranged from a

  1. Development of Flow Boiling and Condensation Experiment on the International Space Station- Normal and Low Gravity Flow Boiling Experiment Development and Test Results

    Science.gov (United States)

    Nahra, Henry K.; Hall, Nancy R.; Hasan, Mohammad M.; Wagner, James D.; May, Rochelle L.; Mackey, Jeffrey R.; Kolacz, John S.; Butcher, Robert L.; Frankenfield, Bruce J.; Mudawar, Issam; hide

    2013-01-01

    Flow boiling and condensation have been identified as two key mechanisms for heat transport that are vital for achieving weight and volume reduction as well as performance enhancement in future space systems. Since inertia driven flows are demanding on power usage, lower flows are desirable. However, in microgravity, lower flows are dominated by forces other than inertia (like the capillary force). It is of paramount interest to investigate limits of low flows beyond which the flow is inertial enough to be gravity independent. One of the objectives of the Flow Boiling and Condensation Flight Experiment sets to investigate these limits for flow boiling and condensation. A two-phase flow loop consisting of a Flow Boiling Module and two Condensation Modules has been developed to experimentally study flow boiling condensation heat transfer in the reduced gravity environment provided by the reduced gravity platform. This effort supports the development of a flow boiling and condensation facility for the International Space Station (ISS). The closed loop test facility is designed to deliver the test fluid, FC-72 to the inlet of any one of the test modules at specified thermodynamic and flow conditions. The zero-g-aircraft tests will provide subcooled and saturated flow boiling critical heat flux and flow condensation heat transfer data over wide range of flow velocities. Additionally, these tests will verify the performance of all gravity sensitive components, such as evaporator, condenser and accumulator associated with the two-phase flow loop. We will present in this paper the breadboard development and testing results which consist of detailed performance evaluation of the heater and condenser combination in reduced and normal gravity. We will also present the design of the reduced gravity aircraft rack and the results of the ground flow boiling heat transfer testing performed with the Flow Boiling Module that is designed to investigate flow boiling heat transfer and

  2. Industrial test and techno-economic analysis of CO2 capture in Huaneng Beijing coal-fired power station

    International Nuclear Information System (INIS)

    Huang, Bin; Xu, Shisen; Gao, Shiwang; Liu, Lianbo; Tao, Jiye; Niu, Hongwei; Cai, Ming; Cheng, Jian

    2010-01-01

    The first industrial-scale CO 2 capture plant in China has been demonstrated at Huaneng Beijing power plant has shown that this technology is a good option for the capture of CO 2 produced by commercial coal-fired power plants. The commissioning and industrial tests are introduced in this paper. The tests show that in the early stages of the passivation phase, the concentration variations of amine, anti-oxidant and Fe 3+ are in the normal range, and the main parameters achieve the design value. The efficiency of the CO 2 capture was about 80-85%, and by the end of January 2009 about 900 tons of CO 2 (99.7%) have been captured. The equipment investment and consumptive costs, including steam, power, solution and others, have been analyzed. The results show: the cost of the absorber and the stripper account for about 50% of main equipment; the consumptive cost is about 25.3 US$ per metric tons of CO 2 , of which the steam requirement accounts for about 55%; the COE increased by 0.02 US$/kW h and the electricity purchase price increased by 29%. (author)

  3. Flexibility in fuel manufacturing

    International Nuclear Information System (INIS)

    Reparaz, A.; Stavig, W.E.; McLees, R.B.

    1987-01-01

    From its inception Exxon Nuclear has produced both BWR and PWR fuels. This is reflected in a product line that, to date, includes over 20 fuel designs. These range from 6x6 design at one end of the spectrum to the recently introduced 17x17 design. The benefits offered include close tailoring of the fuel design to match the customer's requirements, and the ability to rapidly introduce product changes, such as the axial blanket design, with a minimal impact on manufacturing. This flexibility places a number of demands on the manufacturing organization. Close interfaces must be established, and maintained, between the marketing, product design, manufacturing, purchasing and quality organizations, and the information flows must be immediate and accurate. Production schedules must be well planned and must be maintained or revised to reflect changing circumstances. Finally, the manufacturing facilities must be designed to allow rapid switchover between product designs with minor tooling changes and/or rerouting of product flows to alternate work stations. Among the tools used to manage the flow of information and to maintain the tight integration necessary between the various manufacturing, engineering and quality organizations is a commercially available, computerized planning and tracking system, AMAPS. A real-time production data collection system has been designed which gathers data from each production work station for use by the shop floor control module of AMAPS. Accuracy of input to the system is improved through extensive use of bar codes to gather information on the product as it moves through and between work stations. This computerized preparation of material tracing has an impact on direct manufacturing records, quality control records, nuclear material records and accounting and inventory records. This is of benefit to both Exxon Nuclear and its customers

  4. Examination of Communication Delays on Team Performance: Utilizing the International Space Station (ISS) as a Test Bed for Analog Research

    Science.gov (United States)

    Keeton, K. E.; Slack, K, J.; Schmidt, L. L.; Ploutz-Snyder, R.; Baskin, P.; Leveton, L. B.

    2011-01-01

    Operational conjectures about space exploration missions of the future indicate that space crews will need to be more autonomous from mission control and operate independently. This is in part due to the expectation that communication quality between the ground and exploration crews will be more limited and delayed. Because of potential adverse effects on communication quality, both researchers and operational training and engineering experts have suggested that communication delays and the impact these delays have on the quality of communications to the crew will create performance decrements if crews are not given adequate training and tools to support more autonomous operations. This presentation will provide an overview of a research study led by the Behavioral Health and Performance Element (BHP) of the NASA Human Research Program that examines the impact of implementing a communication delay on ISS on individual and team factors and outcomes, including performance and related perceptions of autonomy. The methodological design, data collection efforts, and initial results of this study to date will be discussed . The results will focus on completed missions, DRATS and NEEMO15. Lessons learned from implementing this study within analog environments will also be discussed. One lesson learned is that the complexities of garnishing a successful data collection campaign from these high fidelity analogs requires perseverance and a strong relationship with operational experts. Results of this study will provide a preliminary understanding of the impact of communication delays on individual and team performance as well as an insight into how teams perform and interact in a space-like environment . This will help prepare for implementation of communication delay tests on the ISS, targeted for Increment 35/36.

  5. Diffusion in flexible pipes

    Energy Technology Data Exchange (ETDEWEB)

    Brogaard Kristensen, S.

    2000-06-01

    This report describes the work done on modelling and simulation of the complex diffusion of gas through the wall of a flexible pipe. The diffusion and thus the pressure in annulus depends strongly on the diffusion and solubility parameters of the gas-polymer system and on the degree of blocking of the outer surface of the inner liner due to pressure reinforcements. The report evaluates the basis modelling required to describe the complex geometries and flow patterns. Qualitatively results of temperature and concentration profiles are shown in the report. For the program to serve any modelling purpose in 'real life' the results need to be validated and possibly the model needs corrections. Hopefully, a full-scale test of a flexible pipe will provide the required temperatures and pressures in annulus to validate the models. (EHS)

  6. Diffusion in flexible pipes

    Energy Technology Data Exchange (ETDEWEB)

    Brogaard Kristensen, S

    2000-06-01

    This report describes the work done on modelling and simulation of the complex diffusion of gas through the wall of a flexible pipe. The diffusion and thus the pressure in annulus depends strongly on the diffusion and solubility parameters of the gas-polymer system and on the degree of blocking of the outer surface of the inner liner due to pressure reinforcements. The report evaluates the basis modelling required to describe the complex geometries and flow patterns. Qualitatively results of temperature and concentration profiles are shown in the report. For the program to serve any modelling purpose in 'real life' the results need to be validated and possibly the model needs corrections. Hopefully, a full-scale test of a flexible pipe will provide the required temperatures and pressures in annulus to validate the models. (EHS)

  7. Flexible Laser Metal Cutting

    DEFF Research Database (Denmark)

    Villumsen, Sigurd; Jørgensen, Steffen Nordahl; Kristiansen, Morten

    2014-01-01

    This paper describes a new flexible and fast approach to laser cutting called ROBOCUT. Combined with CAD/CAM technology, laser cutting of metal provides the flexibility to perform one-of-a-kind cutting and hereby realises mass production of customised products. Today’s laser cutting techniques...... possess, despite their wide use in industry, limitations regarding speed and geometry. Research trends point towards remote laser cutting techniques which can improve speed and geometrical freedom and hereby the competitiveness of laser cutting compared to fixed-tool-based cutting technology...... such as punching. This paper presents the concepts and preliminary test results of the ROBOCUT laser cutting technology, a technology which potentially can revolutionise laser cutting....

  8. Geologic and hydrologic records of observation wells, test holes, test wells, supply wells, springs, and surface water stations in the Los Alamos area

    International Nuclear Information System (INIS)

    Purtymun, W.D.

    1995-01-01

    Hundreds of holes have been drilled into the Pajarito Plateau and surrounding test areas of the Los Alamos National Laboratory since the end of World War II. They range in depth from a few feet to more than 14,000 ft. The holes were drilled to provide geologic, hydrologic, and engineering information related to development of a water supply, to provide data on the likelihood or presence of subsurface contamination from hazardous and nuclear materials, and for engineering design for construction. The data contained in this report provide a basis for further investigations into the consequences of our past, present, and future interactions with the environment

  9. Additional safety assessments, follow-up of stress tests of the French nuclear power stations. Action plan of the nuclear safety authority

    International Nuclear Information System (INIS)

    2012-01-01

    This document presents the French national action plan defined by the Nuclear Safety Authority (ASN) in compliance with the recommendations made by the ENSREG (European nuclear safety regulators group). It refers to decisions taken at the national level after the Fukushima accident, recommendations after European stress tests, and recommendations after the extraordinary meeting of contracting parties at the Convention on Nuclear Safety of August 2012. For different topics, this document recalls the recommendations made by the peer review, indicates the ASN's opinion and progress or ASN's requirements for different power stations. The first part addresses the recommendations made by peers and based on the European review. Topics concern natural hazards (effects, detection, inspections and controls related to earthquakes, margin assessment with respect to flooding and natural hazards), the loss of safety systems (cooling systems, electricity supplies, actions, instruments, training, and so on), the management of a severe accident (reference levels, measures, guides, exercises, training, management of contaminated water, radiation protection, premises). The second part deals with topics addressed within the frame of the Convention: national organisations, organisations in an emergency and post-accidental situation, international cooperation. A third part addresses the follow-up of additional measures issued by the ASN

  10. Cognitive Flexibility in Obsessive Compulsive Disorder

    DEFF Research Database (Denmark)

    Jónsson, Hjalti; Salkovskis, Paul M.

    BT for problems such as OCD requires a level of cognitive flexibility (that is the ability to take a different perspective on ones problems). It could be argued that problems in set shifting (by neuropsychological tests) might underpin problems in this area. Two assessments were used (1: perception...... of cognitive flexibility was assessed by questionnaire 2: neuropsychological evaluation of set shifting). This study will recruit three groups: OCD patients, anxious and healthy controls. Cognitive flexibility is measured using modified version of the Cognitive Flexibility Scale (Martin & Rubin, 1995......) and neuropsychological measures of cognitive flexibility (Wisconsin Cart Sorting Test, Trail Making Test A/B, The Brixton Test). IN addition to the group comparison, the relationship between perceived flexibility, set shifting and psychopathology will be investigated. The implications of the findings for treatment...

  11. Corrective Action Investigation Plan for Corrective Action Unit 490: Station 44 Burn Area, Tonopah Test Range, Nevada (with Record of Technical Change No.1)

    International Nuclear Information System (INIS)

    2000-01-01

    This Corrective Action Investigation Plan (CAIP) contains the U.S. Department of Energy, Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 490 under the Federal Facility Agreement and Consent Order. Corrective Active Unit 490 consists of four Corrective Action Sites (CASs): 03-56-001-03BA, Fire Training Area (FTA); RG-56-001-RGBA, Station 44 Burn Area; 03-58-001-03FN, Sandia Service Yard; and 09-54-001-09L2, Gun Propellant Burn Area. These CASs are located at the Tonopah Test Range near Areas 3 and 9. Historically, the FTA was used for training exercises where tires and wood were ignited with diesel fuel. Records indicate that water and carbon dioxide were the only extinguishing agents used during these training exercises. The Station 44 Burn Area was used for fire training exercises and consisted of two wooden structures. The two burn areas (ignition of tires, wood, and wooden structures with diesel fuel and water) were limited to the building footprints (10 ft by 10 ft each). The Sandia Service Yard was used for storage (i.e., wood, tires, metal, electronic and office equipment, construction debris, and drums of oil/grease) from approximately 1979 to 1993. The Gun Propellant Burn Area was used from the 1960s to 1980s to burn excess artillery gun propellant, solid-fuel rocket motors, black powder, and deteriorated explosives; additionally, the area was used for the disposal of experimental explosive items. Based on site history, the focus of the field investigation activities will be to: (1) determine the presence of contaminants of potential concern (COPCs) at each CAS, (2) determine if any COPCs exceed field-screening levels and/or preliminary action levels, and (3) determine the nature and extent of contamination with enough certainty to support selection of corrective action alternatives for each CAS. The scope of this CAIP is to resolve the

  12. Corrective Action Investigation Plan for Corrective Action Unit 490: Station 44 Burn Area, Tonopah Test Range, Nevada (with Record of Technical Change No.1)

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, Nevada Operations Office

    2000-06-09

    This Corrective Action Investigation Plan (CAIP) contains the U.S. Department of Energy, Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 490 under the Federal Facility Agreement and Consent Order. Corrective Active Unit 490 consists of four Corrective Action Sites (CASs): 03-56-001-03BA, Fire Training Area (FTA); RG-56-001-RGBA, Station 44 Burn Area; 03-58-001-03FN, Sandia Service Yard; and 09-54-001-09L2, Gun Propellant Burn Area. These CASs are located at the Tonopah Test Range near Areas 3 and 9. Historically, the FTA was used for training exercises where tires and wood were ignited with diesel fuel. Records indicate that water and carbon dioxide were the only extinguishing agents used during these training exercises. The Station 44 Burn Area was used for fire training exercises and consisted of two wooden structures. The two burn areas (ignition of tires, wood, and wooden structures with diesel fuel and water) were limited to the building footprints (10 ft by 10 ft each). The Sandia Service Yard was used for storage (i.e., wood, tires, metal, electronic and office equipment, construction debris, and drums of oil/grease) from approximately 1979 to 1993. The Gun Propellant Burn Area was used from the 1960s to 1980s to burn excess artillery gun propellant, solid-fuel rocket motors, black powder, and deteriorated explosives; additionally, the area was used for the disposal of experimental explosive items. Based on site history, the focus of the field investigation activities will be to: (1) determine the presence of contaminants of potential concern (COPCs) at each CAS, (2) determine if any COPCs exceed field-screening levels and/or preliminary action levels, and (3) determine the nature and extent of contamination with enough certainty to support selection of corrective action alternatives for each CAS. The scope of this CAIP is to resolve

  13. Pumped energy transfer stations (STEP)

    International Nuclear Information System (INIS)

    Tournery, Jean-Francois

    2015-12-01

    As objectives of development are high for renewable energies (they are supposed to cover 50 per cent of new energy needs by 2035), pumped energy transfer stations are to play an important role in this respect. The author first discusses the consequences of the development of renewable energies on the exploitation of electric grids: issue of intermittency for some of them, envisaged solutions. Then, he addresses one of the solutions: the storage of electric power. He notices that increasing the potential energy of a volume of water is presently the most mature solution to face massive needs of the power system. Dams and pumped energy transfer stations represent now almost the whole installed storage power in the world. The author then presents these pumped energy transfer stations: principle, brief history (the first appeared in Italy and Switzerland at the end of the 1890's). He indicates the various parameters of assessment of such stations: maximum stored energy, installed power in pumping mode and turbine mode, time constant, efficiency, level of flexibility. He discusses economic issues. He describes and comments the operation of turbine-pump groups: ternary groups, reversible binary groups. He discusses barriers to be overcome and technical advances to be made for varying speed groups and for marine stations. He finally gives an overview (table with number of stations belonging to different power ranges, remarkable installations) of existing stations in China, USA, Japan, Germany, Austria, Spain, Portugal, Italy, Switzerland, France and UK, and indicate predictions regarding storage needs at the world level. Some data are finally indicated for the six existing French installations

  14. Balance and flexibility.

    Science.gov (United States)

    2003-12-01

    The 'work-life balance' and flexible working are currently key buzz terms in the NHS. Those looking for more information on these topics should visit Flexibility at www.flexibility.co.uk for a host of resources designed to support new ways of working, including information on flexible workers and flexible rostering, the legal balancing act for work-life balance and home working.

  15. Development and Certification of Station Development Test Objective (SDTO) Experiment # 15012-U, "Near RealTime Water Quality Monitoring Demonstration for ISS Biocides Using Colorimetric Solid Phase Extraction (CSPE)"

    Science.gov (United States)

    Gazda, Daniel B.; Nolan, Daniel J.; Rutz, Jeffrey A.; Shcultz, John R.; Siperko, Lorraine M.; Porter, Marc D,; Lipert, Robert J.; Limardo, Jose G.; McCoy, J. Torin

    2009-01-01

    Scientists and engineers from the Wyle Integrated Science and Engineering Group are working with researchers at the University of Utah and Iowa State University to develop and certify an experimental water quality monitoring kit based on Colorimetric Solid Phase Extraction (CSPE). The kit will be launched as a Station Development Test Objective (SDTO) experiment and evaluated on the International Space Station (ISS) to determine the acceptability of CSPE technology for routine inflight water quality monitoring. Iodine and silver, the biocides used in the US and Russian on-orbit water systems, will serve as test analytes for the technology evaluation. This manuscript provides an overview of the CSPE SDTO experiment and details the development and certification of the experimental water quality monitoring kit. Initial results from reagent and standard solution stability testing and environmental testing performed on the kit hardware are also reported.

  16. Microbiological Tests Performed During the Design of the International Space Station Environmental Control and Life Support Systems. Part 1, Bulk Phase. Part 1; Bulk Phase

    Science.gov (United States)

    Roman, Monsi C.; Mittelman, Marc W.

    2010-01-01

    The design and manufacturing of the main Environmental Control and Life Support Systems (ECLSS) for the United States segments of the International Space Station (ISS) was an involved process that started in the mid 1980s, with the assessment and testing of competing technologies that could be used to clean the air and recycle water. It culminated in 2009 with the delivery and successful activation of the Water Recovery System (WRS) water processor (WP). The ECLSS required the work of a team of engineers and scientist working together to develop systems that could clean and/or recycle human metabolic loads to maintain a clean atmosphere and provide the crew clean water. One of the main goals of the ECLSS is to minimize the time spent by the crew worrying about vital resources not available in the vacuum of space, which allows them to spend most of their time learning to live in a microgravity environment many miles from the comforts of Earth and working on science experiments. Microorganisms are a significant part of the human body as well as part of the environment that we live in. Therefore, the ISS ECLSS design had to take into account the effect microorganisms have on the quality of stored water and wastewater, as well as that of the air systems. Hardware performance issues impacted by the accumulation of biofilm and/or microbiologically influenced corrosion were also studied during the ECLSS development stages. Many of the tests that were performed had to take into account the unique aspects of a microgravity environment as well as the challenge of understanding how to design systems that could not be sterilized or maintained in a sterile state. This paper will summarize the work of several studies that were performed to assess the impacts and/or to minimize the effects of microorganisms in open, semi-closed and closed loop life support system. The biofilm and biodeterioration studies that were performed during the design and test periods will be presented in

  17. Comparison of the CATHENA model of Gentilly-2 end shield cooling system predictions to station data

    Energy Technology Data Exchange (ETDEWEB)

    Zagre, G.; Sabourin, G. [Candu Energy Inc., Montreal, Quebec (Canada); Chapados, S. [Hydro-Quebec, Montreal, Quebec (Canada)

    2012-07-01

    As part of the Gentilly-2 Refurbishment Project, Hydro-Quebec has elected to perform the End Shield Cooling Safety Analysis. A CATHENA model of Gentilly-2 End Shield Cooling System was developed for this purpose. This model includes new elements compared to other CANDU6 End Shield Cooling models such as a detailed heat exchanger and control logic model. In order to test the model robustness and accuracy, the model predictions were compared with plant measurements.This paper summarizes this comparison between the model predictions and the station measurements. It is shown that the CATHENA model is flexible and accurate enough to predict station measurements for critical parameters, and the detailed heat exchanger model allows reproducing station transients. (author)

  18. Alternative methods of flexible base compaction acceptance.

    Science.gov (United States)

    2012-11-01

    "This report presents the results from the second year of research work investigating issues with flexible base acceptance testing within the Texas Department of Transportation. This second year of work focused on shadow testing non-density-based acc...

  19. Development of Flexible Pneumatic Cylinder with Built-in Flexible Linear Encoder and Flexible Bending Sensor

    Science.gov (United States)

    Akagi, Tetsuya; Dohta, Shujiro; Matsushita, Hisashi; Fukuhara, Akimasa

    The purpose of this study is to develop a lightweight and intelligent soft actuator which can be safely attached to the human body. A novel flexible pneumatic cylinder that can be used even if it is deformed by external force had been proposed. The cylinder can realize both pushing and pulling motions even if the cylinder bends. In this paper, a flexible pneumatic cylinder with a built-in flexible linear encoder is proposed and tested. The encoder can detect the cylinder displacement even if the cylinder bends. In the next step, to realize an intelligent flexible cylinder, it is essential to recognize the angle of deflection of the cylinder to estimate the direction of the external force. Therefore, a flexible bending sensor that can measure the directional angle by attaching it to the end of the cylinder is also proposed and tested. The tested bending sensor also consists of four inexpensive photo-reflectors set on the circumferential surface to the cylinder tube every 90 degrees from the center of the tube. By measuring the distance between the photo reflector and the surface of the tube at each point, the bending directional angle of the cylinder can be obtained. A low cost measuring system using a micro-computer incorporating a programmed Up/Down counter to measure the displacement of the cylinder is also developed. As a result, it was confirmed that the measuring accuracy of the bending directional angle was good, less than 0.7 degrees as a standard deviation.

  20. Level of flexibility through sit and reach test from research performed in São Paulo city doi: 10.5007/1980-0037.2010v12n6p415

    Directory of Open Access Journals (Sweden)

    Cibele Calvi Anic Ribeiro

    2010-09-01

    Full Text Available The objective of this study was to examine the level of flexibility in men and women of different ages by the sit-and-reach test and to classify them according to the Canadian Standardized Test of Fitness (CSTF. The results were used to elaborate a new table that reflects the population studied. The sample consisted of 16,405 physically active and inactive subjects who were divided according to age: 15 to 19 (n = 954, 20 to 29 (n = 2916, 30 to 39 (n = 2161, 40 to 49 (n = 2333, 50 to 59 (n = 2739, 60 to 69 (n = 3195, and > 70 years (n = 2107. Percentiles were calculated using the original test scores and the 20th, 40th, 60th and 80th percentiles were used as cut-offs for classification as poor, below the average, average, above the average and excellent, respectively. According to the CSTF classification, the age groups from 15 to 39 years were classified as poor, with mean flexibility ranging from 24.805±9.684 to 26.130± 10.111 cm in women and from 21.480±9.905 to 22.848±9.648 cm in men. In the 40- to 69-year age groups, mean flexibility ranged from 22.768±9.627 to 25.396±9.547 in women and from 16.396±10.136 to 19.935±9.192 cm in men and was classified as below the average. Although most of the subjects performed regular exercise, the mean flexibility level observed did not correspond to the average suggested by the CSTF, demonstrating the importance of elaborating national reference tables and of establishing new normative values such as the table proposed in this study.

  1. Flexible magnetoimpedance sensor

    KAUST Repository

    Li, Bodong; Kavaldzhiev, Mincho; Kosel, Jü rgen

    2015-01-01

    Flexible magnetoimpedance (MI) sensors fabricated using a NiFe/Cu/NiFe tri-layer on Kapton substrate have been studied. A customized flexible microstrip transmission line was employed to investigate the MI sensors's magnetic field and frequency

  2. Flexible Carpooling: Exploratory Study

    OpenAIRE

    Dorinson, Diana; Gay, Deanna; Minett, Paul; Shaheen, Susan

    2009-01-01

    Energy consumption could be reduced if more people shared rides rather than driving alone yet carpooling represents a small proportion of all potential carpoolers. Prior research has found that many who might carpool were concerned about reduced flexibility with carpooling. If flexibility is one of the barriers how could carpooling be organized to be more flexible? In Northern Virginia a flexible system has evolved where there are 3,500 single-use carpools per day. In another example there ...

  3. Structural Verification of the First Orbital Wonder of the World - The Structural Testing and Analysis of the International Space Station (ISS)

    Science.gov (United States)

    Zipay, John J.; Bernstein, Karen S.; Bruno, Erica E.; Deloo, Phillipe; Patin, Raymond

    2012-01-01

    The International Space Station (ISS) can be considered one of the structural engineering wonders of the world. On par with the World Trade Center, the Colossus of Rhodes, the Statue of Liberty, the Great Pyramids, the Petronas towers and the Burj Khalifa skyscraper of Dubai, the ambition and scope of the ISS structural design, verification and assembly effort is a truly global success story. With its on-orbit life projected to be from its beginning in 1998 to the year 2020 (and perhaps beyond), all of those who participated in its development can consider themselves part of an historic engineering achievement representing all of humanity. The structural design and verification of the ISS could be the subject of many scholarly papers. Several papers have been written on the structural dynamic characterization of the ISS once it was assembled on-orbit [1], but the ground-based activities required to assure structural integrity and structural life of the individual elements from delivery to orbit through assembly and planned on-orbit operations have never been totally summarized. This paper is intended to give the reader an overview of some of the key decisions made during the structural verification planning for the elements of the U.S. On-Orbit Segment (USOS) as well as to summarize the many structural tests and structural analyses that were performed on its major elements. An effort is made for this paper to be summarily comprehensive, but as with all knowledge capture efforts of this kind, there are bound to be errors of omission. Should the reader discover any of these, please feel free to contact the principal author. The ISS (Figure 1) is composed of pre-integrated truss segments and pressurized elements supplied by NASA, the Russian Federal Space Agency (RSA), the European Space Agency (ESA) and the Japanese Aerospace Exploration Agency (JAXA). Each of these elements was delivered to orbit by a launch vehicle and connected to one another either robotically or

  4. Easy and flexible mixture distributions

    DEFF Research Database (Denmark)

    Fosgerau, Mogens; Mabit, Stefan L.

    2013-01-01

    We propose a method to generate flexible mixture distributions that are useful for estimating models such as the mixed logit model using simulation. The method is easy to implement, yet it can approximate essentially any mixture distribution. We test it with good results in a simulation study...

  5. Rationality, decision flexibility and pensions

    NARCIS (Netherlands)

    Koç, Emre

    2015-01-01

    In this thesis several different aspects of the standard economic theory (SET) are examined. One of the premises of the SET is that whether or not an agent has choice flexibility does not influence his behavior. In the first chapter of the thesis we design an experiment to test the validity of this

  6. Principles of nuclear power station control

    International Nuclear Information System (INIS)

    Knowles, J.B.

    1975-12-01

    This memorandum represents lecture notes first distributed as part of a UKAEA introductory course on Reactor Technology held during November 1975. A nuclear power station is only one element of a dispersed interconnected arrangement of other nuclear and fossil-fired units which together constitute the national 'grid'. Thus the control of any one station must relate to the objectives of the grid network as a whole. A precise control of the supply frequency of the grid is achieved by regulating the output power of individual stations, and it is necessary for each station to be stable when operating in isolation with a variable load. As regards individual stations, several special control problems concerned with individual plant items are discussed, such as: controlled reactivity insertions, temperature reactivity time constants and flow instability. A simplified analysis establishes a fundamental relationship between the stored thermal energy of a boiler unit (a function of mechanical construction) and the flexibility of the heat source (nuclear or fossil-fired) if the station is to cope satisfactorily with demands arising from unscheduled losses of other generating sets or transmission capacity. Two basic control schemes for power station operation are described known as 'coupled' and 'decoupled control'. Each of the control modes has its own merits, which depend on the proposed station operating strategy (base load or load following) and the nature of the heat source. (U.K.)

  7. Automatic system of tests for control equipment in combined cycle power stations; Sistema automatico de pruebas para equipos de control en centrales de ciclo combinado

    Energy Technology Data Exchange (ETDEWEB)

    Martinez M, Miguel A; Flores L, Zenon; Delgadillo V, Miguel A; Gutierrez A, Ruben [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2001-07-01

    This article deals on the Automatic System of Tests, denominated PROBADOR, used by the Gerencia de Control e Instrumentation (GCI) of the Instituto de Investigaciones Electricas (IIE)for the accomplishment of dynamic tests in laboratory, to the systems of acquisition and control developed with the electronic line SAC-IIE that are installed in the Thermoelectric Power station of Combined Cycle (CTCC) of Dos Bocas, Veracruz and Gomez Palacio, Durango, Mexico. Also the architecture, the functions that are carried out in the equipment of the System of Acquisition and control (SAC) and in the personal computer (PC) that conforms it are described, as well as the methodology used for the development of the tests. The PC constitutes Interface Man-Machine (IMM) and in the SAC equipment the simulation of the processes is made (by means of the execution of algebraic-differential equations) in the compressor, combustion chamber, gas turbine, heat recuperators, steam turbines and condenser equipment that integrate a CTCC. The equations that are used are based in the thermodynamics, flow dynamics and heat transfer; they become attached to the real process with a margin of error that is estimated in 10%. Finally, the tendencies of the PROBADOR and the technical and economic advantages are described that it has provided for the improvement in the performance of the control systems, before different situations, with no need to have the real process. [Spanish] Este articulo versa sobre el Sistema Automatico de Pruebas, denominado PROBADOR, utilizado por la Gerencia de Control e Instrumentacion (GCI) del Instituto de Investigaciones Electricas para la realizacion de pruebas dinamicas en laboratorio, a los sistemas de adquisicion y control desarrollado con la linea electronica SAC-IIE que estan instalados en las Centrales Termoelectricas de Ciclo Combinado (CTCC) de Dos Bocas, Veracruz y Gomez Palacio, Durango, Mexico. Tambien se describen la arquitectura, las funciones que se llevan

  8. Guidelines for Learning Stations.

    Science.gov (United States)

    Fehrle, Carl C.; Schulz, Jolene

    Guidelines for designing and planning learning stations for pupils at the elementary grade level include suggestions on how to develop a station that will be successful in meeting the learners' needs. Instructions for the use of tapes at a station and matching pupils with stations are given, as are guidelines on classroom arrangement and record…

  9. A novel flexible clinical multiphoton tomograph for early melanoma detection, skin analysis, testing of anti-age products, and in situ nanoparticle tracking

    Science.gov (United States)

    Weinigel, Martin; Breunig, Hans Georg; Gregory, Axel; Fischer, Peter; Kellner-Höfer, Marcel; Bückle, Rainer; König, Karsten

    2010-02-01

    High-resolution 3D microscopy based on multiphoton induced autofluorescence and second harmonic generation have been introduced in 1990. 13 years later, CE-marked clinical multiphoton systems for 3D imaging of human skin with subcellular resolution have first been launched by JenLab company with the tomography DermaInspect®. This year, the second generation of clinical multiphoton tomographs was introduced. The novel multiphoton tomograph MPTflex, equipped with a flexible articulated optical arm, provides an increased flexibility and accessibility especially for clinical and cosmetical examinations. Improved image quality and signal to noise ratio (SNR) are achieved by a very short source-drain spacing, by larger active areas of the detectors and by single photon counting (SPC) technology. Shorter image acquisition time due to improved image quality reduces artifacts and simplifies the operation of the system. The compact folded optical design and the light-weight structure of the optical head eases the handling. Dual channel detectors enable to distinguish between intratissue elastic fibers and collagenous structures simultaneously. Through the use of piezo-driven optics a stack of optical cross-sections (optical sectioning) can be acquired and 3D imaging can be performed. The multiphoton excitation of biomolecules like NAD(P)H, flavins, porphyrins, elastin, and melanin is done by picojoule femtosecond laser pulses from an tunable turn-key femtosescond near infrared laser system. The ability for rapid high-quality image acquisition, the user-friendly operation of the system and the compact and flexible design qualifies this system to be used for melanoma detection, diagnostics of dermatological disorders, cosmetic research and skin aging measurements as well as in situ drug monitoring and animal research.

  10. Operational Flexibility Responses to Environmental Uncertainties

    OpenAIRE

    Miller, Kent D.

    1994-01-01

    This study develops and tests a behavioral model of organizational changes in operational flexibility. Regression results using an international data set provide strong support for the general proposition that uncertainties associated with different environmental components--poitical, government policy, macroeconomic, competitive, input and product demand uncertainties--have different implications for firm internal, locational, and supploer flexibility. Slack acts as a buffer attenuating, a...

  11. Development of method for detecting signs deterioration in insulator of high-voltage motors. 2. Test Results of a new on-line partial discharge monitor for high-voltage motors in nuclear power stations

    International Nuclear Information System (INIS)

    Tochio, Atsushi; Kaneda, Yoshiharu; Urakawa, Nobuo

    2000-01-01

    For the purpose of early detection of deterioration of insulators in high-voltage motors which are widely utilized in nuclear power stations, a new on-line partial discharge (PD) monitor was developed and was tested for sixteen motors which were practically running in nuclear power stations. From the test results, it is seen that (1) good signal to noise ratio is obtained by adopting a two frequency correlation method, (2) a resistance temperature detector (RTD) in a motor has sufficient sensitivity to detect PD, (3) when RTD is not installed or is unable to use for this purpose, a radio frequency current transformer (RFCT) can be utilized, although its sensitivity is about 1/10 of that of the RTD monitor. Finally we found a good correlation between the results of this on-line method and the conventional off-line method in which the insulator resistance of a concerned motor was measured during its shut-down, and thereby we demonstrated that this method could be applicable to the on-line test of high-voltage motors in nuclear power stations. (author)

  12. A systematic analysis of directional site effects at stations of the Italian Seismic Network to test the role of local topography

    Science.gov (United States)

    Pischiutta, Marta; Cianfarra, Paola; Salvini, Francesco; Cara, Fabrizio; Vannoli, Paola

    2018-03-01

    Directional site effects observed at seismological stations on pronounced relief are analyzed. We investigate the ground motion properties calculating horizontal-to-vertical spectral ratios and horizontal polarization of both ambient vibrations and earthquake records using broadband seismograms of the Italian Seismic Network. We find that a subset of 47 stations with pronounced relief, results in a significant (>2) directional amplification of the horizontal component, with a well defined, site-specific direction of motion. However, the horizontal spectral response of sites is not uniform, varying from an isolated (resonant) frequency peak to a broadband amplification, interesting frequency bands as large as 1-10 Hz in many cases. Using the 47 selected stations, we have tried to establish a relation between directional amplification and topography geometry in a 2D-vision, when applicable, through a morphological analysis of the Digital Elevation Model using Geographic Information Systems. The procedure computes the parameters that characterize the geometry of topographic irregularities (size and slope), in combination with a principal component analysis that automatically yields the orientation of the elongated ridges. In seeking a relation between directional amplification and the surface morphology, we have found that it is impossible to fit the variety of observations with a resonant topography model as well as to identify common features in the ground motion behavior for stations with similar topography typologies. We conclude that, rather than the shape of the topography, local structural complexities and details of the near-surface structure must play a predominant role in controlling ground motion properties at sites with pronounced relief.

  13. Preliminary Sensorimotor and Cardiovascular Results from the Joint Russian and U.S. Pilot Field Test with Planning for the Full Field Test Beginning with the Year Long Intenational Space Station

    Science.gov (United States)

    Reschke, M. F.; Kozlovskaya, I. B.; Tomilovskaya, E. S.; Bloomberg, J. J.; Platts, S. H.; Rukavishnikov, I. V.; Fomina, E. V.; Stenger, M. B.; Lee, S. M. C.; Wood, S. J.; hide

    2014-01-01

    Ongoing collaborative research efforts between NASA's Neuroscience and Cardiovascular Laboratories, and the Institute of Biomedical Problems' (IBMP) Sensory-Motor and Countermeasures Laboratories have been measuring functional sensorimotor, cardiovascular and strength responses following bed rest, dry immersion, short duration (Space Shuttle) and long duration (Mir and International Space Station) space flights. While the unloading paradigms associated with dry immersion and bed rest does serve as acceptable flight analogs, testing of crew responses following the long duration flights previously has not been possible until a minimum of 24 hours after landing. As a result, it is not possible to estimate the nonlinear trend of the early (testing at landing site. By joint agreement, this research effort has been identified as the functional Field Test (FT). For practical reasons the FT has been divided into two phases: the full FT and a preliminary pilot version (PFT) of the FT that is reduced in both length and scope. The primary goal of this research is to determine functional abilities in long duration space flight crews beginning as soon after landing as possible (test in conjunction with postural ataxia testing (quiet stance sway) as well as cardiovascular responses during other functional tasks. In addition to the immediate post-landing collection of data for the full FT, postflight data will be acquired at a minimum of one to three more other times within the 24 hr following landing and continue until functional sensorimotor and cardiovascular responses have returned to preflight normative values. The PFT represents a single trial run comprised of jointly agreed upon subset of tests from the full FT and relies heavily on IBMP's Sensory-Motor and Countermeasures Laboratories for content and implementation. The PFT was first conducted following the September 2013 landing of the Soyuz spacecraft (34S) and again following the landing of Soyuz 35S in November

  14. Developments of space station; Uchu station no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    Hashimoto, H. [National Space Development Agency of Japan, Tokyo (Japan)

    1996-03-05

    This paper introduces the Japanese experiment module (JEM) in developing a space station. The JEM consists of systems of a pressurizing section, an exposure section, a pressurizing portion of a supply section, a manipulator and an exposure portion of the supply section. The pressurizing section circulates and controls air so that crews can perform experiments under pressurized environment. The exposure section is a part in which experiments are carried out under exposure environment. The supply section runs between a station and the ground, with required devices loaded on it. The manipulator performs attaching a payload for the exposure section and replaces experimental samples. The JEM undergoes a schedule of fabricating an engineering model, testing for a certification a prototype flight model, and putting the model on a flight. The pressurizing section, exposure section and manipulator are at the stage of system tests. Surveillance of the JEM and control of the experiments are carried out at the Tsukuba Space Center. The Center is composed of a space experiment building, a zero-gravity environment testing building, an astronaut training building, a space station operating building, and a space station testing building. 7 figs., 2 tabs.

  15. Inter-vertebral flexibility of the ostrich neck: implications for estimating sauropod neck flexibility.

    Science.gov (United States)

    Cobley, Matthew J; Rayfield, Emily J; Barrett, Paul M

    2013-01-01

    The flexibility and posture of the neck in sauropod dinosaurs has long been contentious. Improved constraints on sauropod neck function will have major implications for what we know of their foraging strategies, ecology and overall biology. Several hypotheses have been proposed, based primarily on osteological data, suggesting different degrees of neck flexibility. This study attempts to assess the effects of reconstructed soft tissues on sauropod neck flexibility through systematic removal of muscle groups and measures of flexibility of the neck in a living analogue, the ostrich (Struthio camelus). The possible effect of cartilage on flexibility is also examined, as this was previously overlooked in osteological estimates of sauropod neck function. These comparisons show that soft tissues are likely to have limited the flexibility of the neck beyond the limits suggested by osteology alone. In addition, the inferred presence of cartilage, and varying the inter-vertebral spacing within the synovial capsule, also affect neck flexibility. One hypothesis proposed that flexibility is constrained by requiring a minimum overlap between successive zygapophyses equivalent to 50% of zygapophyseal articular surface length (ONP50). This assumption is tested by comparing the maximum flexibility of the articulated cervical column in ONP50 and the flexibility of the complete neck with all tissues intact. It is found that this model does not adequately convey the pattern of flexibility in the ostrich neck, suggesting that the ONP50 model may not be useful in determining neck function if considered in isolation from myological and other soft tissue data.

  16. Inter-vertebral flexibility of the ostrich neck: implications for estimating sauropod neck flexibility.

    Directory of Open Access Journals (Sweden)

    Matthew J Cobley

    Full Text Available The flexibility and posture of the neck in sauropod dinosaurs has long been contentious. Improved constraints on sauropod neck function will have major implications for what we know of their foraging strategies, ecology and overall biology. Several hypotheses have been proposed, based primarily on osteological data, suggesting different degrees of neck flexibility. This study attempts to assess the effects of reconstructed soft tissues on sauropod neck flexibility through systematic removal of muscle groups and measures of flexibility of the neck in a living analogue, the ostrich (Struthio camelus. The possible effect of cartilage on flexibility is also examined, as this was previously overlooked in osteological estimates of sauropod neck function. These comparisons show that soft tissues are likely to have limited the flexibility of the neck beyond the limits suggested by osteology alone. In addition, the inferred presence of cartilage, and varying the inter-vertebral spacing within the synovial capsule, also affect neck flexibility. One hypothesis proposed that flexibility is constrained by requiring a minimum overlap between successive zygapophyses equivalent to 50% of zygapophyseal articular surface length (ONP50. This assumption is tested by comparing the maximum flexibility of the articulated cervical column in ONP50 and the flexibility of the complete neck with all tissues intact. It is found that this model does not adequately convey the pattern of flexibility in the ostrich neck, suggesting that the ONP50 model may not be useful in determining neck function if considered in isolation from myological and other soft tissue data.

  17. Office flexible cystoscopy.

    Science.gov (United States)

    Kavoussi, L R; Clayman, R V

    1988-11-01

    Since the development of the first purpose-built flexible cystoscope in 1984, flexible cystoscopy has become an accepted diagnostic and therapeutic modality. Indeed, it is estimated that more than 10 per cent of practicing urologists are already familiar with this technology. The flexible cystoscope has markedly extended the urologist's ability to examine the bladder, and it has become a valuable adjunct to the rigid cystoscope. Although the operation of this instrument is vastly different from that of its rigid counterpart, with practice, the technique can be learned. After experience is obtained with diagnostic flexible cystoscopy, the urologist will likely prefer this new instrument for bladder inspection, as it provides for a more thorough yet less morbid and less expensive examination. In the future, the development of improved and smaller instrumentation will further extend the therapeutic indications for flexible cystoscopy. Indeed, advances in laser technology are already providing the urologist with 300- to 600-micron (0.9 to 1.8F) flexible probes capable of incision (KTP laser), fulguration (Nd:YAG laser), and stone disintegration (tunable dye laser). Lastly, the skills obtained in using the flexible cystoscope are all readily applicable to the development of dexterity with the already available flexible nephroscope and the more recently developed flexible ureteroscope.

  18. Reference Climatological Stations

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Reference Climatological Stations (RCS) network represents the first effort by NOAA to create and maintain a nationwide network of stations located only in areas...

  19. Streamflow Gaging Stations

    Data.gov (United States)

    Department of Homeland Security — This map layer shows selected streamflow gaging stations of the United States, Puerto Rico, and the U.S. Virgin Islands, in 2013. Gaging stations, or gages, measure...

  20. Fire Stations - 2007

    Data.gov (United States)

    Kansas Data Access and Support Center — Fire Station Locations in Kansas Any location where fire fighters are stationed at or based out of, or where equipment that such personnel use in carrying out their...

  1. Hammond Bay Biological Station

    Data.gov (United States)

    Federal Laboratory Consortium — Hammond Bay Biological Station (HBBS), located near Millersburg, Michigan, is a field station of the USGS Great Lakes Science Center (GLSC). HBBS was established by...

  2. Water Level Station History

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Images contain station history information for 175 stations in the National Water Level Observation Network (NWLON). The NWLON is a network of long-term,...

  3. Weather Radar Stations

    Data.gov (United States)

    Department of Homeland Security — These data represent Next-Generation Radar (NEXRAD) and Terminal Doppler Weather Radar (TDWR) weather radar stations within the US. The NEXRAD radar stations are...

  4. Big Game Reporting Stations

    Data.gov (United States)

    Vermont Center for Geographic Information — Point locations of big game reporting stations. Big game reporting stations are places where hunters can legally report harvested deer, bear, or turkey. These are...

  5. Ocean Station Vessel

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Ocean Station Vessels (OSV) or Weather Ships captured atmospheric conditions while being stationed continuously in a single location. While While most of the...

  6. Fire Stations - 2009

    Data.gov (United States)

    Kansas Data Access and Support Center — Fire Stations in Kansas Any location where fire fighters are stationed or based out of, or where equipment that such personnel use in carrying out their jobs is...

  7. Newport Research Station

    Data.gov (United States)

    Federal Laboratory Consortium — The Newport Research Station is the Center's only ocean-port research facility. This station is located at Oregon State University's Hatfield Marine Science Center,...

  8. A distributed planning concept for Space Station payload operations

    Science.gov (United States)

    Hagopian, Jeff; Maxwell, Theresa; Reed, Tracey

    1994-01-01

    The complex and diverse nature of the payload operations to be performed on the Space Station requires a robust and flexible planning approach. The planning approach for Space Station payload operations must support the phased development of the Space Station, as well as the geographically distributed users of the Space Station. To date, the planning approach for manned operations in space has been one of centralized planning to the n-th degree of detail. This approach, while valid for short duration flights, incurs high operations costs and is not conducive to long duration Space Station operations. The Space Station payload operations planning concept must reduce operations costs, accommodate phased station development, support distributed users, and provide flexibility. One way to meet these objectives is to distribute the planning functions across a hierarchy of payload planning organizations based on their particular needs and expertise. This paper presents a planning concept which satisfies all phases of the development of the Space Station (manned Shuttle flights, unmanned Station operations, and permanent manned operations), and the migration from centralized to distributed planning functions. Identified in this paper are the payload planning functions which can be distributed and the process by which these functions are performed.

  9. Space Station personal hygiene study

    Science.gov (United States)

    Prejean, Stephen E.; Booher, Cletis R.

    1986-01-01

    A personal hygiene system is currently under development for Space Station application that will provide capabilities equivalent to those found on earth. This paper addresses the study approach for specifying both primary and contingency personal hygiene systems and provisions for specified growth. Topics covered are system definition and subsystem descriptions. Subsystem interfaces are explored to determine which concurrent NASA study efforts must be monitored during future design phases to stay up-to-date on critical Space Station parameters. A design concept for a three (3) compartment personal hygiene facility is included as a baseline for planned test and verification activities.

  10. CDIP Station Data Collection - All Stations

    Data.gov (United States)

    Scripps Institution of Oceanography, UC San Diego — The Coastal Data Information Program's station data collection consists of all publicly-released coastal environment measurements taken over the program's history, a...

  11. Organizational flexibility estimation

    OpenAIRE

    Komarynets, Sofia

    2013-01-01

    By the help of parametric estimation the evaluation scale of organizational flexibility and its parameters was formed. Definite degrees of organizational flexibility and its parameters for the Lviv region enterprises were determined. Grouping of the enterprises under the existing scale was carried out. Special recommendations to correct the enterprises behaviour were given.

  12. Reversibly Bistable Flexible Electronics

    KAUST Repository

    Alfaraj, Nasir

    2015-05-01

    Introducing the notion of transformational silicon electronics has paved the way for integrating various applications with silicon-based, modern, high-performance electronic circuits that are mechanically flexible and optically semitransparent. While maintaining large-scale production and prototyping rapidity, this flexible and translucent scheme demonstrates the potential to transform conventionally stiff electronic devices into thin and foldable ones without compromising long-term performance and reliability. In this work, we report on the fabrication and characterization of reversibly bistable flexible electronic switches that utilize flexible n-channel metal-oxide-semiconductor field-effect transistors. The transistors are fabricated initially on rigid (100) silicon substrates before they are peeled off. They can be used to control flexible batches of light-emitting diodes, demonstrating both the relative ease of scaling at minimum cost and maximum reliability and the feasibility of integration. The peeled-off silicon fabric is about 25 µm thick. The fabricated devices are transferred to a reversibly bistable flexible platform through which, for example, a flexible smartphone can be wrapped around a user’s wrist and can also be set back to its original mechanical position. Buckling and cyclic bending of such host platforms brings a completely new dimension to the development of flexible electronics, especially rollable displays.

  13. Flexible magnetoimpidence sensor

    KAUST Repository

    Kavaldzhiev, Mincho

    2015-05-01

    Recently, flexible electronic devices have attracted increasing interest, due to the opportunities they promise for new applications such as wearable devices, where the components are required to flex during normal use[1]. In this light, different magnetic sensors, like microcoil, spin valve, giant magnetoresistance (GMR), magnetoimpedance (MI), have been studied previously on flexible substrates.

  14. Flexibility within Fidelity

    Science.gov (United States)

    Kendall, Philip C.; Gosch, Elizabeth; Furr, Jami M.; Sood, Erica

    2008-01-01

    The authors address concerns regarding manual-based treatments, highlighting the role of flexibility and creativity. A cognitive-behavioral therapy for youth anxiety called the Coping Cat program demonstrates the flexible application of manuals and emphasizes the importance of a child-centered, personalized approach that involves the child in the…

  15. Flexible position probe assembly

    International Nuclear Information System (INIS)

    Schmitz, J.J.

    1977-01-01

    The combination of a plurality of tubular transducer sections and a flexible supporting member extending through the tubular transducer sections forms a flexible elongated probe of a design suitable for monitoring the level of an element, such as a nuclear magnetically permeable control rod or liquid. 3 claims, 23 figures

  16. Global Sourcing Flexibility

    DEFF Research Database (Denmark)

    Ørberg Jensen, Peter D.; Petersen, Bent

    2013-01-01

    the higher costs (but decreased risk for value chain disruption) embedded in a more flexible global sourcing model that allows the firm to replicate and/or relocate activities across multiple locations. We develop a model and propositions on facilitating and constraining conditions of global sourcing...... sourcing flexibility. Here we draw on prior research in the fields of organizational flexibility, international business and global sourcing as well as case examples and secondary studies. In the second part of the paper, we discuss the implications of global sourcing flexibility for firm strategy...... and operations against the backdrop of the theory-based definition of the construct. We discuss in particular the importance of global sourcing flexibility for operational performance stability, and the trade-off between specialization benefits, emerging from location and service provider specialization, versus...

  17. A facility for training Space Station astronauts

    Science.gov (United States)

    Hajare, Ankur R.; Schmidt, James R.

    1992-01-01

    The Space Station Training Facility (SSTF) will be the primary facility for training the Space Station Freedom astronauts and the Space Station Control Center ground support personnel. Conceptually, the SSTF will consist of two parts: a Student Environment and an Author Environment. The Student Environment will contain trainers, instructor stations, computers and other equipment necessary for training. The Author Environment will contain the systems that will be used to manage, develop, integrate, test and verify, operate and maintain the equipment and software in the Student Environment.

  18. The Miksova water power station

    International Nuclear Information System (INIS)

    2005-01-01

    Miksova water power station produced total of about 7,161,342 MWh of electricity in its 40 years of activity. According to its functionality, the Miksova pumped storage station (Miksova II) the upper reservoir of which was built from 1963 to 1966 on the Benovsky stream, was an interesting hydro-energy construction. The lower reservoir was formed by the enlarged discharge channel of the Miksova water power station. This power station was a pilot project, at which pumping reversible turbines and other mechanical-technical equipment for hydro power stations were tested, especially for the future construction of PVE Ruzin and Liptovska Mara. A turbine set with a diagonal reversible turbine and an installed capacity of 2.6 MW, which had an operational capacity of 11.2 m 3 .s -1 in a turbine mode of operation and using a head of 22 to 28 m, was installed in the machine room. It pumped 8.8 m 3 .s -1 of water with a power input of 3.1 MW in a pumping mode of operation. During the period of its operation from 1971 to 1984, pumping hydro power station Miksova II produced a total of 13,042 MWh of electricity in total, but by testing reversible turbines and the simulation of some special hydraulic phenomena, this power station lost its importance as low-efficiency source, stopped working and its technological equipment was demounted. Experiences from its construction and from its few years of operation were later used during the construction of our pumping hydro power stations. Prolonging its operating period should help with the installation of a bigger basin on the inflow, from which a greater amount of water could be used for the generation of electrical power in turbine mode of operation

  19. Technical evaluation report TMI action - NUREG-0737 (II.D.1) relief and safety valve testing for Clinton Power Station Unit 1. (Docket No. 50-461)

    International Nuclear Information System (INIS)

    Burr, T.K.; Magleby, H.L.

    1985-05-01

    Light water reactors operators have experienced a number of occurrences of improper performance by safety and relief valves installed in their primary coolant systems. Because of this, the authors of NUREG-0578 (TMI-2 Lessons Learned Task Force Status Report and Short-Term Recommendations) recommended that programs be developed and completed which would reevaluate the performance capabilities of BWR safety and relief valves. This report has examined the response of the Licensee for the Clinton Power Station, Unit 1 to the requirements of NUREG-0578 and subsequently NUREG-0737 and finds that the Licensee has provided an acceptable response, reconfirming that the General Design Criteria 14, 15 and 30 of Appendix A to 10 CFR-50 have been met

  20. Shippingport Station decommissioning project overview

    International Nuclear Information System (INIS)

    Schreiber, J.J.

    1985-01-01

    The U.S. Department of Energy is in the process of decommissioning the Shippingport Atomic Power Station located on the Ohio River, 30 miles northwest of Pittsburgh, Pennsylvania. The Shippingport Station is the first commercial size nuclear power plant to undergo decommissioning in the United Staes. The plant is located on approximately 7 acres of land owned by the Duquesne Light Company (DLC) and leased to the U.S. Government. DLC operates two nuclear power plants, Beaver Valley 1 and 2, located immediately adjacent to the site and the Bruce Mansfield coal-fired power plant is also within the immediate area. The Station was shutdown in October, 1982. Defueling operations began in 1983 and were completed by September, 1984. The Shippingport Station consists of a 275' x 60' fuel handling building containing the reactor containment chamber, the service building, the turbine building, the radioactive waste processing building, the administration building and other smaller support buildings. The Station has four coolant loops and most of the containment structures are located below grade. Structures owned by the U.S. Government including the fuel handling building, service building, contaminated equipment room, the boiler chambers, the radioactive waste processing building and the decontamination and laydown buildings will be dismantled and removed to 3 feet below grade. The area will then be filled with clean soil and graded. The turbine building, testing and training building and the administration building are owned by DLC and will remain

  1. The remote security station (RSS)

    International Nuclear Information System (INIS)

    Pletta, J.B.

    1991-01-01

    This paper reports that, as an outgrowth of research into physical security systems, Sandia is investigating robotic technologies for improving physical security performance and flexibility. Robotic systems have the potential to allow more effective utilization of security personnel, especially in scenarios where they might be exposed to harm. They also can supplement fixed site installations where sensors have failed or where transient assets are present. The Remote Security Station (RSS) program for the defense Nuclear Agency is developing a proof-of-principle robotic system which will be used to evaluate the role, and associated cost, of robotic technologies in exterior physical security systems. The RSS consists of three primary elements: a fixed but quickly moveable tripod with intrusion detection sensors and assessment camera; a mobile robotic platform with a functionally identical security module; and a control console which allows an operator to perform security functions and teleoperate the mobile platform

  2. Evaluation of the base/subgrade soil under repeated loading : phase I--laboratory testing and numerical modeling of geogrid reinforced bases in flexible pavement.

    Science.gov (United States)

    2009-10-01

    This report documents the results of a study that was conducted to characterize the behavior of geogrid reinforced base : course materials. The research was conducted through an experimental testing and numerical modeling programs. The : experimental...

  3. Non-Coop Station History

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Station history documentation for stations outside the US Cooperative Observer network. Primarily National Weather Service stations assigned WBAN station IDs. Other...

  4. The Role of Non-Destructive Testing in Test-Reactor Operation at the National Reactor Testing Station; Role des Essais Non Destructifs dans l'Exploitation des Reacteurs d'Essai au Centre National d'Essais de Reacteurs; Rol' nedestruktivnykh ispytanij pri ehkspluatatsii ispytatel'nykh reaktorov na natsional'noj stantsii po ispytaniyam reaktorov; Papel de los Metodos No Destructivos en la Explotacion de los Reactores de la National Reactor Testing Station

    Energy Technology Data Exchange (ETDEWEB)

    Francis, W. C.; Brown, E. S.; Burdick, E. E.; Gibson, G. W.; Tingey, F. H. [Phillips Petroleum Company, Atomic Energy Division, Idaho Falls, Idaho (United States)

    1965-10-15

    The huge investment (well over $100 000 000) in the Nuclear Test Reactors at the National Reactor Testing Station and the need to operate them safely requires the highest order of quality control for reactor and test components, especially for fuel and control elements. Non-destructive testing has, therefore, assumed a very vital role in establishing the quality of these components before their use in the Test Reactors. Although many of these non-destructive tests follow well-established procedures, many unique techniques have been developed and new uses made of conventional equipment. Ultrasonic techniques have long been used at this site for detecting voids, non-bonding and internal cracking. More recently this work has been extended to the automated scanning of curved plates and to the inspection of irradiated fuel plates in the storage canals. A very interesting work has been the application of the ultrasonic technique to the detection of brittle core fracture which may occur in forming operations. A gamma-scanning technique to establish the U{sup 235} content of fuel elements has proved so reliable that it is the basis for assessing financial penalties for out-of-specification material. Radiographs of fuel plates provide core dimensions and, with densitometer scans, determine fuel distribution. Radiographing of welds is standard procedure for reactor and test loop components. Burnup of fuel and poison in test specimens may be determined each reactor cycle by the use of the Advanced Reactivity Measurement Facility (ARMF). A somewhat unusual application for a critical facility is the measurement of the boron content of fuel in the Engineering Test Reactor Critical Facility (ETRC). Eddy-current and mechanical probing of fuel-plate spacing and eddy-current gauging of oxide film thickness (corrosion) on irradiated plates have given excellent results. Additional techniques, which have proved valuable, include liquid penetrant inspection and liquid nitrogen tests for

  5. Flexible eddy current coil arrays

    International Nuclear Information System (INIS)

    Krampfner, Y.; Johnson, D.P.

    1987-01-01

    A novel approach was devised to overcome certain limitations of conventional eddy current testing. The typical single-element hand-wound probe was replaced with a two dimensional array of spirally wound probe elements deposited on a thin, flexible polyimide substrate. This provides full and reliable coverage of the test area and eliminates the need for scanning. The flexible substrate construction of the array allows the probes to conform to irregular part geometries, such as turbine blades and tubing, thereby eliminating the need for specialized probes for each geometry. Additionally, the batch manufacturing process of the array can yield highly uniform and reproducible coil geometries. The array is driven by a portable computer-based eddy current instrument, smartEDDY/sup TM/, capable of two-frequency operation, and offers a great deal of versatility and flexibility due to its software-based architecture. The array is coupled to the instrument via an 80-switch multiplexer that can be configured to address up to 1600 probes. The individual array elements may be addressed in any desired sequence, as defined by the software

  6. Confiabilidad de pruebas para flexibilidad en futbolistas jóvenes de un club profesional [Reliability of Flexibility Tests in Young Soccer Players From a Professional Club

    Directory of Open Access Journals (Sweden)

    Cristian Díaz-Escobar

    2018-01-01

    Full Text Available Objetivo. Estimar la confiabilidad de pruebas para medir la flexibilidad de la musculatura flexoextensora de la rodilla, de acuerdo con la temporada, la edad y la posición de juego en jugadores varones del área formativa de un club profesional de fútbol. Material y métodos. La medición de la flexibilidad se realizó mediante la aplicación de las pruebas Modified. Thomas Test (MT Test para cuádriceps y el Modified Back-Saber Sit-and-Reach Test (MBS Test para isquiotibiales. La confiabilidad se estimó mediante el α de Cronbach. Resultados. Ambas pruebas presentaron estimaciones altas de confiabilidad entre temporadas, por categorías de jugadores, puesto de juego y en comparación del rendimiento entre miembro inferior derecho e izquierdo. Conclusiones. Ambas pruebas pueden ser aplicadas en deportes colectivos, como acontece en el área formativa de clubes profesionales de fútbol, especialmente, en la prevención de lesiones deportivas, al tener una validez aceptada, presentar una alta confiabilidad de acuerdo con el estudio y además, tener como características: bajo costo, fácil aplicación y medir un volumen importante de personas en breves periodos de tiempo.

  7. Flexible Word Classes

    DEFF Research Database (Denmark)

    • First major publication on the phenomenon • Offers cross-linguistic, descriptive, and diverse theoretical approaches • Includes analysis of data from different language families and from lesser studied languages This book is the first major cross-linguistic study of 'flexible words', i.e. words...... that cannot be classified in terms of the traditional lexical categories Verb, Noun, Adjective or Adverb. Flexible words can - without special morphosyntactic marking - serve in functions for which other languages must employ members of two or more of the four traditional, 'specialised' word classes. Thus......, flexible words are underspecified for communicative functions like 'predicating' (verbal function), 'referring' (nominal function) or 'modifying' (a function typically associated with adjectives and e.g. manner adverbs). Even though linguists have been aware of flexible world classes for more than...

  8. Reversibly Bistable Flexible Electronics

    KAUST Repository

    Alfaraj, Nasir

    2015-01-01

    Introducing the notion of transformational silicon electronics has paved the way for integrating various applications with silicon-based, modern, high-performance electronic circuits that are mechanically flexible and optically semitransparent

  9. Flexibility in insulin prescription

    Directory of Open Access Journals (Sweden)

    Sanjay Kalra

    2016-01-01

    Full Text Available This communication explores the concept of flexibility, a propos insulin preparations and insulin regimes used in the management of type 2 diabetes. The flexibility of an insulin regime or preparation is defined as their ability to be injected at variable times, with variable injection-meal time gaps, in a dose frequency and quantum determined by shared decision making, with a minimal requirement of glucose monitoring and health professional consultation, with no compromise on safety, efficiency and tolerability. The relative flexibility of various basal, prandial and dual action insulins, as well as intensive regimes, is compared. The biopsychosocial model of health is used to assess the utility of different insulins while encouraging a philosophy of flexible insulin usage.

  10. Tests on instrumentation and control systems important to safety in nuclear power stations. Systempruefung der leittechnischen Einrichtungen des Sicherheitssystems in Kernkraftwerken

    Energy Technology Data Exchange (ETDEWEB)

    1985-01-01

    The rule applies to the reactor protection system, to the protection and state boundaries, to control devices important to safety, and to danger alarms of the classes S and I. The system inspection of the control devices of the safety system comprises in-service testing and recurrent testing.

  11. Flexible displays, rigid designs?

    DEFF Research Database (Denmark)

    Hornbæk, Kasper

    2015-01-01

    Rapid technological progress has enabled a wide range of flexible displays for computing devices, but the user experience--which we're only beginning to understand--will be the key driver for successful designs.......Rapid technological progress has enabled a wide range of flexible displays for computing devices, but the user experience--which we're only beginning to understand--will be the key driver for successful designs....

  12. Amtrak Rail Stations (National)

    Data.gov (United States)

    Department of Transportation — Updated database of the Federal Railroad Administration's (FRA) Amtrak Station database. This database is a geographic data set containing Amtrak intercity railroad...

  13. Cooperative Station History Forms

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Various forms, photographs and correspondence documenting the history of Cooperative station instrumentation, location changes, inspections, and...

  14. Behavioral flexibility and problem solving in an invasive bird.

    Science.gov (United States)

    Logan, Corina J

    2016-01-01

    Behavioral flexibility is considered an important trait for adapting to environmental change, but it is unclear what it is, how it works, and whether it is a problem solving ability. I investigated behavioral flexibility and problem solving experimentally in great-tailed grackles, an invasive bird species and thus a likely candidate for possessing behavioral flexibility. Grackles demonstrated behavioral flexibility in two contexts, the Aesop's Fable paradigm and a color association test. Contrary to predictions, behavioral flexibility did not correlate across contexts. Four out of 6 grackles exhibited efficient problem solving abilities, but problem solving efficiency did not appear to be directly linked with behavioral flexibility. Problem solving speed also did not significantly correlate with reversal learning scores, indicating that faster learners were not the most flexible. These results reveal how little we know about behavioral flexibility, and provide an immense opportunity for future research to explore how individuals and species can use behavior to react to changing environments.

  15. Safety Evaluation Report, pump and valve inservice testing program, Yankee Rowe Nuclear Power Station (Docket No. 50-29). Revision 1

    International Nuclear Information System (INIS)

    Ransom, C.B.; Rockhold, H.C.

    1985-10-01

    The staff reviewed the Yankee Rowe IST program submittal dated October 2, 1981 and evaluated the proposed tests for compliance with the requirements of the ASME Boiler and Pressure Vessel Code, Section XI, 1977 Edition, through the Summer of 1978 Addenda. Those items not in compliance were discussed in a working session with Yankee Atomic Electric Company personnel, USNRC representatives, and EG and G Idaho reviewers on June 22, 1982. The evaluations presented in this SER of the Yankee Rowe pump and valve inservice testing program and the associated relief requests are those of the NRC staff. These findings apply only to component testing

  16. Design of an MSAT-X mobile transceiver and related base and gateway stations

    Science.gov (United States)

    Fang, Russell J. F.; Bhaskar, Udaya; Hemmati, Farhad; Mackenthun, Kenneth M.; Shenoy, Ajit

    This paper summarizes the results of a design study of the mobile transceiver, base station, and gateway station for NASA's proposed Mobile Satellite Experiment (MSAT-X). Major ground segment system design issues such as frequency stability control, modulation method, linear predictive coding vocoder algorithm, and error control technique are addressed. The modular and flexible transceiver design is described in detail, including the core, RF/IF, modem, vocoder, forward error correction codec, amplitude-companded single sideband, and input/output modules, as well as the flexible interface. Designs for a three-carrier base station and a 10-carrier gateway station are also discussed, including the interface with the controllers and with the public-switched telephone networks at the gateway station. Functional specifications are given for the transceiver, the base station, and the gateway station.

  17. Design of an MSAT-X mobile transceiver and related base and gateway stations

    Science.gov (United States)

    Fang, Russell J. F.; Bhaskar, Udaya; Hemmati, Farhad; Mackenthun, Kenneth M.; Shenoy, Ajit

    1987-01-01

    This paper summarizes the results of a design study of the mobile transceiver, base station, and gateway station for NASA's proposed Mobile Satellite Experiment (MSAT-X). Major ground segment system design issues such as frequency stability control, modulation method, linear predictive coding vocoder algorithm, and error control technique are addressed. The modular and flexible transceiver design is described in detail, including the core, RF/IF, modem, vocoder, forward error correction codec, amplitude-companded single sideband, and input/output modules, as well as the flexible interface. Designs for a three-carrier base station and a 10-carrier gateway station are also discussed, including the interface with the controllers and with the public-switched telephone networks at the gateway station. Functional specifications are given for the transceiver, the base station, and the gateway station.

  18. Online scheduling of 2-re-entrant flexible manufacturing systems

    NARCIS (Netherlands)

    Pinxten, J. van; Waqas, U.; Geilen, M.; Basten, T.; Somers, L.

    2017-01-01

    Online scheduling of operations is essential to optimize productivity of flexible manufacturing systems (FMSs) where manufacturing requests arrive on the fly. An FMS processes products according to a particular flow through processing stations. This work focusses on online scheduling of re-entrant

  19. Transceiver for Space Station Freedom

    Science.gov (United States)

    Fitzmaurice, M.; Bruno, R.

    1990-07-01

    This paper describes the design of the Laser Communication Transceiver (LCT) system which was planned to be flight tested as an attached payload on Space Station Freedom. The objective in building and flight-testing the LCT is to perform a broad class of tests addressing the critical aspects of space-based optical communications systems, providing a base of experience for applying laser communications technology toward future communications needs. The LCT's functional and performance requirements and capabilities with respect to acquisition, spatial tracking and pointing, communications, and attitude determination are discussed.

  20. The APS optics topography station

    International Nuclear Information System (INIS)

    Krasnicki, S.

    1996-01-01

    An in-house station for topographic testing of x-ray optical elements for the Advanced Photon Source experimental beamlines was set up by the Experimental Facilities Division of Argonne National Laboratory. A new double-crystal x-ray diffractometer was designed and built keeping in mind the need for testing large crystals possibly attached to cooling manifolds and lines. A short description of the new facility is given. The instrument performance fully satisfies imposed requirements, and the machine was successfully used for testing several silicon and diamond crystals

  1. Can we afford shutting down power stations?

    International Nuclear Information System (INIS)

    Hesse, David

    2015-01-01

    The author discusses and criticizes some popular beliefs on the profitability of nuclear power stations, on the fact that they are now too old to be exploited, and on the fact that nuclear energy is the most subsidised energy. As some European countries decided to phase out nuclear, he notices that the decrease of gas prices undermines the profitability of nuclear power stations in the USA and that new rules aimed at the reduction of CO 2 emissions result in high subsidies for renewable energies which are however handicapped by the grid ability to integrate all energies. He outlines that shutting down a nuclear power station costs a lot of money to the society, and denies the argument of non-profitability of these stations. He states that the issue of nuclear subsidies is in fact a matter of tax policy. He also states that these so-said old power stations take in fact advantage of numerous technical innovations for their equipment, components, technology and fuels which improve their efficiency, durability, performance and flexibility

  2. The risk of leukaemia in young children from exposure to tritium and carbon-14 in the discharges of German nuclear power stations and in the fallout from atmospheric nuclear weapons testing

    Energy Technology Data Exchange (ETDEWEB)

    Wakeford, Richard [The University of Manchester, Centre for Occupational and Environmental Health, Institute of Population Health, Manchester (United Kingdom)

    2014-05-15

    Towards the end of 2007, the results were published from a case-control study (the ''KiKK Study'') of cancer in young children, diagnosed <5 years of age during 1980-2003 while resident near nuclear power stations in western Germany. The study found a tendency for cases of leukaemia to live closer to the nearest nuclear power station than their matched controls, producing an odds ratio that was raised to a statistically significant extent for residence within 5 km of a nuclear power station. The findings of the study received much publicity, but a detailed radiological risk assessment demonstrated that the radiation doses received by young children from discharges of radioactive material from the nuclear reactors were much lower than those received from natural background radiation and far too small to be responsible for the statistical association reported in the KiKK Study. This has led to speculation that conventional radiological risk assessments have grossly underestimated the risk of leukaemia in young children posed by exposure to man-made radionuclides, and particular attention has been drawn to the possible role of tritium and carbon-14 discharges in this supposedly severe underestimation of risk. Both {sup 3}H and {sup 14}C are generated naturally in the upper atmosphere, and substantial increases in these radionuclides in the environment occurred as a result of their production by atmospheric testing of nuclear weapons during the late 1950s and early 1960s. If the leukaemogenic effect of these radionuclides has been seriously underestimated to the degree necessary to explain the KiKK Study findings, then a pronounced increase in the worldwide incidence of leukaemia among young children should have followed the notably elevated exposure to {sup 3}H and {sup 14}C from nuclear weapons testing fallout. To investigate this hypothesis, the time series of incidence rates of leukaemia among young children <5 years of age at diagnosis has been

  3. ESF [Exploratory Shaft Facility] flexibility analysis

    International Nuclear Information System (INIS)

    Brusenback, R.W.

    1987-03-01

    This report directs that uncertainty allowances be included within the ESF facilities. The recommendations herein developed are intended as input to Title II Design criteria. Flexibility is measured first by lineal ft of drift, and then by hoisting rate and capacity of supporting utilities and services. A defined probability of need shows an extra 10,000 ft of drift for the first level of flexibility responding to testing and operations, and over 60,000 ft of drift for the second level of flexibility which recognizes possible need for perimeter drifting to investigate geologic stratigraphy. Observing there will be time constraints, a single shaft muck hoisting rate up to 170 to 250 tons per hour is recommended. The potential hoisting rate recommended for flexibility should be satisfied by a hoist approximately equivalent to, or conveniently upgraded from those being considered for sinking and construction, or 1000 horsepower. The cost of flexibility is limited to engineering planning and design (mostly conceptual) which makes later expansion achievable, and to selected items for initial construction where later upgrading would be impractical, impossible, or very costly. The cost is fixed to the level of flexibility and does not vary with excavated footage. The incremental margin is only a small fraction of the additional footage made available. Flexibility presents a strategy and not a position of design or technology. Examples used in this report are intended to be illustrative only, and not to lead design or cost estimates. 7 tabs

  4. Development and evaluation of test stations for the quality assurance of the silicon micro-strip detector modules for the CMS experiment

    International Nuclear Information System (INIS)

    Poettgens, M.

    2007-01-01

    CMS (Compact Muon Solenoid) is one of four large-scale detectors which will be operated at the LHC (Large Hadron Collider) at the European Laboratory for Particle Physics (CERN). For the search for new physics the reconstruction of the collision products and their properties is essential. In the innermost part of the CMS detector the traces of ionizing particles are measured utilizing a silicon tracker. A large fraction of this detector is equipped with silicon micro-strip modules which provide a precise space resolution in 1-dimension. A module consists of a sensor for detection of particles, the corresponding read-out electronics (hybrid) and a mechanical support structure. Since the 15,148 modules, which will be installed in the silicon micro-strip detector, have a total sensitive surface area of about 198 m 2 , the inner tracker of CMS is the largest silicon tracking detector, which has ever been built. While the sensors and hybrids are produced in industry, the construction of the modules and the control of the quality is done by the members of the 21 participating institutes. Since the access to the silicon micro-strip tracker will be very limited after the installation in the CMS detector the installed modules must be of high quality. For this reason the modules are thoroughly tested and the test results are uploaded to a central database. By the development of a read-out system and the corresponding software the III. Physikalisches Institut made an important contribution for the electrical and functional quality control of hybrids and modules. The read-out system provides all features for the operation and test of hybrids and modules and stands out due to high reliability and simple handling. Because a very user-friedly and highly automated software it became the official test tool and was integrated in various test stands. The test stands, in which the read-out system is integrated in, are described and the tests which are implemented in the corresponding

  5. Secure base stations

    NARCIS (Netherlands)

    Bosch, Peter; Brusilovsky, Alec; McLellan, Rae; Mullender, Sape J.; Polakos, Paul

    2009-01-01

    With the introduction of the third generation (3G) Universal Mobile Telecommunications System (UMTS) base station router (BSR) and fourth generation (4G) base stations, such as the 3rd Generation Partnership Project (3GPP) Long Term Evolution (LTE) Evolved Node B (eNB), it has become important to

  6. INTERACT Station Catalogue - 2015

    DEFF Research Database (Denmark)

    INTERACT stations are located in all major environmental envelopes of the Arctic providing an ideal platform for studying climate change and its impact on the environment and local communities. Since alpine environments face similar changes and challenges as the Arctic, the INTERACT network also ...... catalogue includes descriptions of 73 research stations included in the network at the time of printing....

  7. Meyrin Petrol Station

    CERN Multimedia

    2006-01-01

    Please note that the Meyrin petrol station will be closed for maintenance work on Tuesday 19 and Wednesday 20 December 2006. If you require petrol during this period we invite you to use the Prévessin petrol station, which will remain open. TS-IC-LO Section Tel.: 77039 - 73793

  8. Nuclear power stations licensing

    International Nuclear Information System (INIS)

    Solito, J.

    1978-04-01

    The judicial aspects of nuclear stations licensing are presented. The licensing systems of the United States, Spain, France and Federal Republic of Germany are focused. The decree n 0 60.824 from July 7 sup(th), 1967 and the following legislation which define the systematic and area of competence in nuclear stations licensing are analysed [pt

  9. SPS rectifier stations

    CERN Multimedia

    CERN PhotoLab

    1974-01-01

    The first of the twelves SPS rectifier stations for the bending magnets arrived at CERN at the end of the year. The photograph shows a station with the rectifiers on the left and in the other three cubicles the chokes, capacitors and resistor of the passive filter.

  10. Ondergronds Station Blijdorp, Rotterdam

    NARCIS (Netherlands)

    Hijma, M.P.|info:eu-repo/dai/nl/266562426; Cohen, K.M.|info:eu-repo/dai/nl/185633374

    2014-01-01

    Het is in de herfst van 2005. Een lief meisje, Marieke, rijdt op haar vouwfiets door Rotterdam. Bij het Centraal Station is het al tijden een grote bouwplaats. Onder de nieuwe hal komt een veel groter metrostation en ook onder de Statenweg in Blijdorp is een grote bouwput voor een nieuw station.

  11. Interfacial characterization of flexible hybrid electronics

    Science.gov (United States)

    Najafian, Sara; Amirkhizi, Alireza V.; Stapleton, Scott

    2018-03-01

    Flexible Hybrid Electronics (FHEs) are the new generation of electronics combining flexible plastic film substrates with electronic devices. Besides the electrical features, design improvements of FHEs depend on the prediction of their mechanical and failure behavior. Debonding of electronic components from the flexible substrate is one of the most common and critical failures of these devices, therefore, the experimental determination of material and interface properties is of great importance in the prediction of failure mechanisms. Traditional interface characterization involves isolated shear and normal mode tests such as the double cantilever beam (DCB) and end notch flexure (ENF) tests. However, due to the thin, flexible nature of the materials and manufacturing restrictions, tests mirroring traditional interface characterization experiments may not always be possible. The ideal goal of this research is to design experiments such that each mode of fracture is isolated. However, due to the complex nonlinear nature of the response and small geometries of FHEs, design of the proper tests to characterize the interface properties can be significantly time and cost consuming. Hence numerical modeling has been implemented to design these novel characterization experiments. This research involves loading case and specimen geometry parametric studies using numerical modeling to design future experiments where either shear or normal fracture modes are dominant. These virtual experiments will provide a foundation for designing similar tests for many different types of flexible electronics and predicting the failure mechanism independent of the specific FHE materials.

  12. For largest space flexibility and largest energy efficiency. Modern room automation enables an open-space solution in the arched structures of the central railway station; Fuer groesste Raumflexibilitaet und hoechste Energieeffizienz. Moderne Raumautomation ermoeglicht Open-Space Loesung in den Buegelbauten des Berliner Hauptbahnhofs

    Energy Technology Data Exchange (ETDEWEB)

    Ottilinger, Werner [Sauter Deutschland, Freiburg im Breisgau (Germany)

    2013-05-15

    A feature of the central railway station in Berlin are the 46 meters high arched structures that span the railway station and accommodate more than 1,500 employees of the Deutsche Bahn AG (Berlin, Federal Republic of Germany). A total of 42,000 square meters of office space and a large business and conference center spread on twelve floors. Within the commissioning of this central railway station, this vast area should be designed technically variable in order to hold the time and cost as low as possible for the reconstruction or change of tenants.

  13. [STEM on Station Education

    Science.gov (United States)

    Lundebjerg, Kristen

    2016-01-01

    The STEM on Station team is part of Education which is part of the External Relations organization (ERO). ERO has traditional goals based around BHAG (Big Hairy Audacious Goal). The BHAG model is simplified to a saying: Everything we do stimulates actions by others to advance human space exploration. The STEM on Station education initiate is a project focused on bringing off the earth research and learning into classrooms. Educational resources such as lesson plans, activities to connect with the space station and STEM related contests are available and hosted by the STEM on Station team along with their partners such as Texas Instruments. These educational activities engage teachers and students in the current happenings aboard the international space station, inspiring the next generation of space explorers.

  14. Central Station Design Options

    DEFF Research Database (Denmark)

    2011-01-01

    . The work identifies the architecture, sizing and siting of prospective Central Stations in Denmark, which can be located at shopping centers, large car parking lots or gas stations. Central Stations are planned to be integrated in the Danish distribution grid. The Danish island of Bornholm, where a high...... overloading, more reference points might be necessary to represent various transformer loading levels. The subject of safety in Central Station is also addressed. A number of safety rules based on European standards apply to AC charging equipment up to 44 kW. The connection interlock and the automatic de......-energization are identified as fundamental requirements for safety in such a charging station. The connection interlock is a solution which ensures that no power is applied to the DC cable when the EV connector is not connected. The automatic de-energization device ensures that whenever a strain on the cable is detected, e...

  15. Allowable Residual Contamination Levels in soil for decommissioning the Shippingport Atomic Power Station site

    International Nuclear Information System (INIS)

    Kennedy, W.E. Jr.; Napier, B.A.; Soldat, J.K.

    1983-09-01

    As part of decommissioning the Shippingport Atomic Power Station, a fundamental concern is the determination of Allowable Residual Contamination Levels (ARCL) for radionuclides in the soil at the site. The ARCL method described in this report is based on a scenario/exposure-pathway analysis and compliance with an annual dose limit for unrestricted use of the land after decommissioning. In addition to naturally occurring radionuclides and fallout from weapons testing, soil contamination could potentially come from five other sources. These include operation of the Shippingport Station as a pressurized water reactor, operations of the Shippingport Station as a light-water breeder, operation of the nearby Beaver Valley reactors, releases during decommissioning, and operation of other nearby industries, including the Bruce-Mansfield coal-fired power plants. ARCL values are presented for 29 individual radionculides and a worksheet is provided so that ARCL values can be determined for any mixture of the individual radionuclides for any annual dose limit selected. In addition, a worksheet is provided for calculating present time soil concentration value that will decay to the ARCL values after any selected period of time, such as would occur during a period of restricted access. The ARCL results are presented for both unconfined (surface) and confined (subsurface) soil contamination. The ARCL method and results described in this report provide a flexible means of determining unrestricted-use site release conditions after decommissioning the Shippingport Atomic Power Station

  16. Leakage warning system for flexible underwater pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Moeller, E; Bernstein, L

    1985-08-01

    Underwater pipelines for unloading oil tankers, e.g. in 30 km distance from the harbour site, are required to be flexible and require supervision. This is done by implementation of oil sensitive sensors between the inner rubber tube and the following impregnated textile layer. The generated sensor signals, influenced by leak oil, have to be wireless transmitted from 150 meters under water to the supervisory station at the coast. Sensor configurations are described, to derive the point of the leakage from the topologized warning signals.

  17. Flexible transparent electrode

    Science.gov (United States)

    Demiryont, Hulya; Shannon, Kenneth C., III; Moorehead, David; Bratcher, Matthew

    2011-06-01

    This paper presents the properties of the EclipseTECTM transparent conductor. EclipseTECTM is a room temperature deposited nanostructured thin film coating system comprised of metal-oxide semiconductor elements. The system possesses metal-like conductivity and glass-like transparency in the visible region. These highly conductive TEC films exhibit high shielding efficiency (35dB at 1 to 100GHz). EclipseTECTM can be deposited on rigid or flexible substrates. For example, EclipseTECTM deposited on polyethylene terephthalate (PET) is extremely flexible that can be rolled around a 9mm diameter cylinder with little or no reduction in electrical conductivity and that can assume pre-extension states after an applied stress is relieved. The TEC is colorless and has been tailored to have high visible transmittance which matches the eye sensitivity curve and allows the viewing of true background colors through the coating. EclipseTECTM is flexible, durable and can be tailored at the interface for applications such as electron- or hole-injecting OLED electrodes as well as electrodes in flexible displays. Tunable work function and optical design flexibility also make EclipseTECTM well-suited as a candidate for grid electrode replacement in next-generation photovoltaic cells.

  18. Flexible magnetoimpedance sensor

    International Nuclear Information System (INIS)

    Li, Bodong; Kavaldzhiev, Mincho N.; Kosel, Jürgen

    2015-01-01

    Flexible magnetoimpedance (MI) sensors fabricated using a NiFe/Cu/NiFe tri-layer on Kapton substrate have been studied. A customized flexible microstrip transmission line was employed to investigate the MI sensors's magnetic field and frequency responses and their dependence on the sensors's deflection. For the first time, the impedance characteristic is obtained through reflection coefficient analysis over a wide range of frequencies from 0.1 MHz to 3 GHz and for deflections ranging from zero curvature to a radius of 7.2 cm. The sensor element maintains a high MI ratio of up to 90% and magnetic sensitivity of up to 9.2%/Oe over different bending curvatures. The relationship between the curvature and material composition is discussed based on the magnetostriction effect and stress simulations. The sensor's large frequency range, simple fabrication process and high sensitivity provide a great potential for flexible electronics and wireless applications. - Highlights: • A flexible magnetoimpedance (MI) sensor is developed. • Studies are carried out using a flexible microstrip transmission line. • An MI ratio of up to 90% is obtained. • The effect of magnetostriction is studied

  19. Education for Flexible Personality

    Directory of Open Access Journals (Sweden)

    Bogomir Novak

    1998-12-01

    Full Text Available Flexible personality transforms both cultural environment and itself. Post-modern personality is both contemplative and active. On one hand, it is subject to inner imagination of a creative act, and on the other hand, to creation of a tangible product What is more, flexible personality is also autonomous, mature, healthy and well balanced, as well as stable and responsive to the demand for change. Due to ever quicker changes, flexible personality is a must. And it is a task. The impact of professional work of adults on the education of children, however, is being conditioned by the exrigid family and rigid enterprises or institutions in which adults are employed. Nevertheless, flexible educational style is not repressive, as it used to be, nor permissive and totally concentrated on the child. It is a choice between the two qualities. The educators' style is dependent on their attitude towards life (play and self-education and not only towards work. Nowadays, flexibility is a way towards quality management of social and personal changes.

  20. Flexible Foam Model.

    Energy Technology Data Exchange (ETDEWEB)

    Neilsen, Michael K.; Lu, Wei-Yang; Werner, Brian T.; Scherzinger, William M.; Lo, Chi S.

    2018-03-01

    Experiments were performed to characterize the mechanical response of a 15 pcf flexible polyurethane foam to large deformation at different strain rates and temperatures. Results from these experiments indicated that at room temperature, flexible polyurethane foams exhibit significant nonlinear elastic deformation and nearly return to their original undeformed shape when unloaded. However, when these foams are cooled to temperatures below their glass transition temperature of approximately -35 o C, they behave like rigid polyurethane foams and exhibit significant permanent deformation when compressed. Thus, a new model which captures this dramatic change in behavior with temperature was developed and implemented into SIERRA with the name Flex_Foam to describe the mechanical response of both flexible and rigid foams to large deformation at a variety of temperatures and strain rates. This report includes a description of recent experiments. Next, development of the Flex Foam model for flexible polyurethane and other flexible foams is described. Selection of material parameters are discussed and finite element simulations with the new Flex Foam model are compared with experimental results to show behavior that can be captured with this new model.

  1. White Mountain Research Station: 25 years of high-altitude research. [organization and functions of test facility for high altitude research

    Science.gov (United States)

    Pace, N.

    1973-01-01

    The organization and functions of a test facility for conducting research projects at high altitudes are discussed. The projects conducted at the facility include the following: (1) bird physiology, (2) cardiorespiratory physiology, (3) endocrinological studies, (4) neurological studies, (5) metabolic studies, and (6) geological studies.

  2. Surry Power Station, Units 1 and 2. Annual operating report for 1976, section 2: core performance and startup physics test reports

    International Nuclear Information System (INIS)

    1977-01-01

    The analyses of four core performance indicators including burnup distribution, reactivity depletion, power distribution, and primary coolant activity are discussed. Information is presented concerning fuel densification monitoring; start-up physics testing; and James River temperature, salinity, fish, biota, and plankton entrainment monitoring

  3. Development of a test station for the illustration of a hydraulic heating network; Entwicklung eines Pruefstandes zur Abbildung eines hydraulischen Heizungsnetzwerks

    Energy Technology Data Exchange (ETDEWEB)

    Kopmann, Nina; Adolph, Michael; Mueller, Dirk [RWTH Aachen Univ. E.ON Energy Research Center (Germany). Inst. for Energy Efficient Buildings and Indoor Climate

    2011-07-01

    As the parameters describing air currents in rooms will change to the opposite when the characteristic length is shortened, small-scale investigations of room air currents are not possible. For this reason, the E.ON Energy Research Center set up a ''Hardware-in-the-Loop'' (HiL) test stand which models a real hydraulic heating system of an apartment or a building. The test stand consists of several interconnected model rooms with typical heating units, and only the enclosing building volume is reduced. The model rooms all have a volume of 3-4 m{sup 3}. Depending on the heat emitted by the radiators, the boundary conditions of air supply (volume flow and temperature) and of the walls (wall surface tempeartures) are calculated using the simulation software Modelica and are emulated in the test stand. The measured heat emissions of the radiators are used as boundary conditions in the thermohydraulic simulations. The function of the HiL test stand was first tested in a single model room. Verification of the test stand concept took place via measurements of the velocity and temperature field in front of the radiator, which were compared with measurements in a thermal test stand with realistic room dimensions. [German] Da die Parameter zur Beschreibung von Raumluftstroemungen bei einer Verkleinerung der charakteristischen Laenge ein gegensaetzliches Verhalten aufweisen, koennen die Untersuchungen von Raumluftstroemungen nicht kleinskaliert werden. Deswegen wird am E.ON Energy Research Center ein ''Hardware-in-the-Loop'' (HiL) -Pruefstand entwickelt, welcher ein reales hydraulisches Heizungsnetz einer Wohnung oder eines Gebaeudes mit geringem Platzbedarf nachbildet. In den Pruefstand, welcher aus mehreren vernetzten Modellraeumen besteht, werden typische Heizkoerper eingebaut und nur das umschliessende Volumen wird verkleinert. Die Modellraeume haben jeweils ein Volumen von 3-4 m{sup 3}. Abhaengig von der Waermeabgabe der Heizkoerper

  4. Consumer flexibility - State and challenges

    International Nuclear Information System (INIS)

    Grande, Ove S.; Saele, Hanne; Morch, Andrei Z.

    2002-02-01

    This report summarises experiences and results from relevant projects carried out within the area of consumer flexibility in the last years. A general description of the projects is presented. In addition are testing activities, economical signals for motivating the end user for load reductions and appropriate technology for communication and effect management mentioned separately. Briefly summarised is the following achieved: 1) The potential for effect regulating measures in ordinary consumption and in power demanding industry is analysed and estimated to 1750 MW and 3360 MW respectively. 2) Time varied rates are developed and are tested. The NVE has decided on this basis that all the network owners should offer season varied rates to their customers. 3) Test projects in Drammen, Oslo and Trondheim have shown that it is possible to motivate smaller consumers for and implement load reductions. 4) Technology for load management for the end user is evaluated. 5) A survey is made viewing the technology for two way communication. In addition the ''option'' market for the reserves of the Statnett has proved that a steady compensation is a sufficient incentive for producing substantial effect reserves in the load sector (power intensive industry). In the last part of the report the incentives and frame conditions for establishing technical solutions and infrastructure are discussed. Further work will focus on the consumer flexibility in shortage situations. The main challenges are connected to: 1) Establishing a foundation for decisions concerning cost efficient investments in necessary technical equipment. 2) To find an optimal combination of a price flexible and remote controlled load reduction

  5. Development and evaluation of test stations for the quality assurance of the silicon micro-strip detector modules for the CMS experiment

    Energy Technology Data Exchange (ETDEWEB)

    Poettgens, M.

    2007-11-22

    CMS (Compact Muon Solenoid) is one of four large-scale detectors which will be operated at the LHC (Large Hadron Collider) at the European Laboratory for Particle Physics (CERN). For the search for new physics the reconstruction of the collision products and their properties is essential. In the innermost part of the CMS detector the traces of ionizing particles are measured utilizing a silicon tracker. A large fraction of this detector is equipped with silicon micro-strip modules which provide a precise space resolution in 1-dimension. A module consists of a sensor for detection of particles, the corresponding read-out electronics (hybrid) and a mechanical support structure. Since the 15,148 modules, which will be installed in the silicon micro-strip detector, have a total sensitive surface area of about 198 m{sup 2}, the inner tracker of CMS is the largest silicon tracking detector, which has ever been built. While the sensors and hybrids are produced in industry, the construction of the modules and the control of the quality is done by the members of the 21 participating institutes. Since the access to the silicon micro-strip tracker will be very limited after the installation in the CMS detector the installed modules must be of high quality. For this reason the modules are thoroughly tested and the test results are uploaded to a central database. By the development of a read-out system and the corresponding software the III. Physikalisches Institut made an important contribution for the electrical and functional quality control of hybrids and modules. The read-out system provides all features for the operation and test of hybrids and modules and stands out due to high reliability and simple handling. Because a very user-friedly and highly automated software it became the official test tool and was integrated in various test stands. The test stands, in which the read-out system is integrated in, are described and the tests which are implemented in the

  6. Flexible working policies and environments in UK Local Authorities: current practice

    OpenAIRE

    Price, Ilfryn

    2001-01-01

    The research surveys the uptake of 'modern' or flexible working practices in UK Local Authorities, especially as it impacts on property and office accommodation.\\ud Nearly all permit flexible starting and finishing times for as many employees as is practical while forms of accredited hours working for at least some appropriate employees are policy in a majority. Flexible practices with property and ICT implications, working from home without a dedicated work station, formal policies, 'hot' de...

  7. Natural flexible dermal armor.

    Science.gov (United States)

    Yang, Wen; Chen, Irene H; Gludovatz, Bernd; Zimmermann, Elizabeth A; Ritchie, Robert O; Meyers, Marc A

    2013-01-04

    Fish, reptiles, and mammals can possess flexible dermal armor for protection. Here we seek to find the means by which Nature derives its protection by examining the scales from several fish (Atractosteus spatula, Arapaima gigas, Polypterus senegalus, Morone saxatilis, Cyprinius carpio), and osteoderms from armadillos, alligators, and leatherback turtles. Dermal armor has clearly been developed by convergent evolution in these different species. In general, it has a hierarchical structure with collagen fibers joining more rigid units (scales or osteoderms), thereby increasing flexibility without significantly sacrificing strength, in contrast to rigid monolithic mineral composites. These dermal structures are also multifunctional, with hydrodynamic drag (in fish), coloration for camouflage or intraspecies recognition, temperature and fluid regulation being other important functions. The understanding of such flexible dermal armor is important as it may provide a basis for new synthetic, yet bioinspired, armor materials. Copyright © 2013 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  8. Flexible magnetoimpedance sensor

    KAUST Repository

    Li, Bodong

    2015-03-01

    Flexible magnetoimpedance (MI) sensors fabricated using a NiFe/Cu/NiFe tri-layer on Kapton substrate have been studied. A customized flexible microstrip transmission line was employed to investigate the MI sensors\\'s magnetic field and frequency responses and their dependence on the sensors\\'s deflection. For the first time, the impedance characteristic is obtained through reflection coefficient analysis over a wide range of frequencies from 0.1 MHz to 3 GHz and for deflections ranging from zero curvature to a radius of 7.2 cm. The sensor element maintains a high MI ratio of up to 90% and magnetic sensitivity of up to 9.2%/Oe over different bending curvatures. The relationship between the curvature and material composition is discussed based on the magnetostriction effect and stress simulations. The sensor\\'s large frequency range, simple fabrication process and high sensitivity provide a great potential for flexible electronics and wireless applications.

  9. Novel Flexible Artificial Magnetic Conductor

    Directory of Open Access Journals (Sweden)

    M. E. de Cos

    2012-01-01

    Full Text Available A novel flexible uniplanar AMC design is presented. An AMC prototype is manufactured using laser micromachining and it is characterized under flat and bent conditions by measuring its reflection coefficient phase in an anechoic chamber. The designed prototype shows broad AMC operation bandwidth (6.96% and higher and polarization angle independency. Its angular stability margin, when operating under oblique incidence, is also tested obtaining ±8° as limit for a 14.4 cm × 14.4 cm prototype.

  10. Flexible experimental FPGA based platform

    DEFF Research Database (Denmark)

    Andersen, Karsten Holm; Nymand, Morten

    2016-01-01

    This paper presents an experimental flexible Field Programmable Gate Array (FPGA) based platform for testing and verifying digital controlled dc-dc converters. The platform supports different types of control strategies, dc-dc converter topologies and switching frequencies. The controller platform...... interface supporting configuration and reading of setup parameters, controller status and the acquisition memory in a simple way. The FPGA based platform, provides an easy way within education or research to use different digital control strategies and different converter topologies controlled by an FPGA...

  11. No effects of power line frequency extremely low frequency electromagnetic field exposure on selected neurobehavior tests of workers inspecting transformers and distribution line stations versus controls.

    Science.gov (United States)

    Li, Li; Xiong, De-fu; Liu, Jia-wen; Li, Zi-xin; Zeng, Guang-cheng; Li, Hua-liang

    2014-03-01

    We aimed to evaluate the interference of 50 Hz extremely low frequency electromagnetic field (ELF-EMF) occupational exposure on the neurobehavior tests of workers performing tour-inspection close to transformers and distribution power lines. Occupational short-term "spot" measurements were carried out. 310 inspection workers and 300 logistics staff were selected as exposure and control. The neurobehavior tests were performed through computer-based neurobehavior evaluation system, including mental arithmetic, curve coincide, simple visual reaction time, visual retention, auditory digit span and pursuit aiming. In 500 kV areas electric field intensity at 71.98% of total measured 590 spots were above 5 kV/m (national occupational standard), while in 220 kV areas electric field intensity at 15.69% of total 701 spots were above 5 kV/m. Magnetic field flux density at all the spots was below 1,000 μT (ICNIRP occupational standard). The neurobehavior score changes showed no statistical significance. Results of neurobehavior tests among different age, seniority groups showed no significant changes. Neurobehavior changes caused by daily repeated ELF-EMF exposure were not observed in the current study.

  12. Software industrial flexible

    OpenAIRE

    Díaz Araya, Daniel; Muñoz, Leandro; Sirerol, Daniel; Oviedo, Sandra; Ibáñez, Francisco S.

    2012-01-01

    En este trabajo se pretende investigar y proponer técnicas, métodos y tecnologías que permitan el desarrollo de software flexible en ambientes industriales. El objetivo es generar métodos y técnicas para facilitar el desarrollo de software flexible en ambientes industriales. Las áreas de investigación son los sistemas de scheduling de producción, la generación de software para plataformas de hardware abiertas y la innovación.

  13. Production Flexibility and Hedging

    Directory of Open Access Journals (Sweden)

    Georges Dionne

    2015-12-01

    Full Text Available We extend the analysis on hedging with price and output uncertainty by endogenizing the output decision. Specifically, we consider the joint determination of output and hedging in the case of flexibility in production. We show that the risk-averse firm always maintains a short position in the futures market when the futures price is actuarially fair. Moreover, in the context of an example, we show that the presence of production flexibility reduces the incentive to hedge for all risk averse agents.

  14. The flexibility of flexicurity

    DEFF Research Database (Denmark)

    Jensen, Carsten Strøby

    2011-01-01

    by a special relation between flexibility, social security and active labour market policy, where a high level of social security is seen as a precondition for a labour market characterized by flexibility. In this article it is argued that the Danish labour market is characterized by having not just one model...... of flexicurity, but two. These two models cover different parts of the labour market and different segments of employees. The first model (the blue-collar flexicurity model) – the one that is often focused on in the literature – covers primarily skilled and unskilled workers on the labour market. The second...

  15. Analyses and estimates of hydraulic conductivity from slug tests in alluvial aquifer underlying Air Force Plant 4 and Naval Air Station-Joint Reserve Base Carswell Field, Fort Worth, Texas

    Science.gov (United States)

    Houston, Natalie A.; Braun, Christopher L.

    2004-01-01

    This report describes the collection, analyses, and distribution of hydraulic-conductivity data obtained from slug tests completed in the alluvial aquifer underlying Air Force Plant 4 and Naval Air Station-Joint Reserve Base Carswell Field, Fort Worth, Texas, during October 2002 and August 2003 and summarizes previously available hydraulic-conductivity data. The U.S. Geological Survey, in cooperation with the U.S. Air Force, completed 30 slug tests in October 2002 and August 2003 to obtain estimates of horizontal hydraulic conductivity to use as initial values in a ground-water-flow model for the site. The tests were done by placing a polyvinyl-chloride slug of known volume beneath the water level in selected wells, removing the slug, and measuring the resulting water-level recovery over time. The water levels were measured with a pressure transducer and recorded with a data logger. Hydraulic-conductivity values were estimated from an analytical relation between the instantaneous displacement of water in a well bore and the resulting rate of head change. Although nearly two-thirds of the tested wells recovered 90 percent of their slug-induced head change in less than 2 minutes, 90-percent recovery times ranged from 3 seconds to 35 minutes. The estimates of hydraulic conductivity range from 0.2 to 200 feet per day. Eighty-three percent of the estimates are between 1 and 100 feet per day.

  16. Space station operations management

    Science.gov (United States)

    Cannon, Kathleen V.

    1989-01-01

    Space Station Freedom operations management concepts must be responsive to the unique challenges presented by the permanently manned international laboratory. Space Station Freedom will be assembled over a three year period where the operational environment will change as significant capability plateaus are reached. First Element Launch, Man-Tended Capability, and Permanent Manned Capability, represent milestones in operational capability that is increasing toward mature operations capability. Operations management concepts are being developed to accomodate the varying operational capabilities during assembly, as well as the mature operational environment. This paper describes operations management concepts designed to accomodate the uniqueness of Space Station Freedoom, utilizing tools and processes that seek to control operations costs.

  17. Testing flight software on the ground: Introducing the hardware-in-the-loop simulation method to the Alpha Magnetic Spectrometer on the International Space Station

    Energy Technology Data Exchange (ETDEWEB)

    Sun, Wenhao, E-mail: wenhao_sun@126.com [Southeast University, Nanjing 210096 (China); Cai, Xudong [Massachusetts Institute of Technology, MA 02139-4307 (United States); Meng, Qiao [Southeast University, Nanjing 210096 (China)

    2016-04-11

    Complex automatic protection functions are being added to the onboard software of the Alpha Magnetic Spectrometer. A hardware-in-the-loop simulation method has been introduced to overcome the difficulties of ground testing that are brought by hardware and environmental limitations. We invented a time-saving approach by reusing the flight data as the data source of the simulation system instead of mathematical models. This is easy to implement and it works efficiently. This paper presents the system framework, implementation details and some application examples.

  18. User Context Aware Base Station Power Flow Model

    OpenAIRE

    Walsh, Barbara; Farrell, Ronan

    2005-01-01

    At present the testing of power amplifiers within base station transmitters is limited to testing at component level as opposed to testing at the system level. While the detection of catastrophic failure is possible, that of performance degradation is not. This paper proposes a base station model with respect to transmitter output power with the aim of introducing system level monitoring of the power amplifier behaviour within the base station. Our model reflects the expe...

  19. Optimization of station battery replacement

    International Nuclear Information System (INIS)

    Jancauskas, J.R.; Shook, D.A.

    1994-01-01

    During a loss of ac power at a nuclear generating station (including diesel generators), batteries provide the source of power which is required to operate safety-related components. Because traditional lead-acid batteries have a qualified life of 20 years, the batteries must be replaced a minimum of once during a station's lifetime, twice if license extension is pursued, and more often depending on actual in-service dates and the results of surveillance tests. Replacement of batteries often occurs prior to 20 years as a result of systems changes caused by factors such as Station Blackout Regulations, control system upgrades, incremental load growth, and changes in the operating times of existing equipment. Many of these replacement decisions are based on the predictive capabilities of manual design basis calculations. The inherent conservatism of manual calculations may result in battery replacements occurring before actually required. Computerized analysis of batteries can aid in optimizing the timing of replacements as well as in interpreting service test data. Computerized analysis also provides large benefits in maintaining the as-configured load profile and corresponding design margins, while also providing the capability of quickly analyze proposed modifications and response to internal and external audits

  20. Space Station solar water heater

    Science.gov (United States)

    Horan, D. C.; Somers, Richard E.; Haynes, R. D.

    1990-01-01

    The feasibility of directly converting solar energy for crew water heating on the Space Station Freedom (SSF) and other human-tended missions such as a geosynchronous space station, lunar base, or Mars spacecraft was investigated. Computer codes were developed to model the systems, and a proof-of-concept thermal vacuum test was conducted to evaluate system performance in an environment simulating the SSF. The results indicate that a solar water heater is feasible. It could provide up to 100 percent of the design heating load without a significant configuration change to the SSF or other missions. The solar heater system requires only 15 percent of the electricity that an all-electric system on the SSF would require. This allows a reduction in the solar array or a surplus of electricity for onboard experiments.

  1. Flexibility as a service

    NARCIS (Netherlands)

    Aalst, van der W.M.P.; Adams, M.; Hofstede, ter A.H.M.; Pesic, M.; Schonenberg, H.; Chen, L.; Liu, C.; Liu, Q.; Deng, K.

    2009-01-01

    The lack of flexibility is often seen as an inhibitor for the successful application of workflow technology. Many researchers have proposed different ways of addressing this problem and some of these ideas have been implemented in commercial systems. However, a "one size fits all" approach is likely

  2. Valuing Flexibility. Phase 2

    Science.gov (United States)

    2012-10-29

    Quarterly (2): 38-49. Cormier, P., Olewnik, A., and Lewis, K. 2008. An Approach to Quantifying Design Flexibility for Mass Customization in Early...C. Clarkson, P., and Zanker, W. 2004. Change and customisation in complex engineering domains, Res Eng Des 15(1), 1–21. Ekstrom, M. and Bjornsson, H

  3. Flexible Query Answering Systems

    DEFF Research Database (Denmark)

    This book constitutes the refereed proceedings of the 12th International Conference on Flexible Query Answering Systems, FQAS 2017, held in London, UK, in June 2017. The 21 full papers presented in this book together with 4 short papers were carefully reviewed and selected from 43 submissions...

  4. Flexible energy systems

    DEFF Research Database (Denmark)

    Lund, Henrik

    2003-01-01

    The paper discusses and analyses diffent national strategies and points out key changes in the energy system in order to achieve a system which can benefit from a high percentage of wind and CHP without having surplus production problems, introduced here as a flexible energy system....

  5. A flexible WLAN receiver

    NARCIS (Netherlands)

    Schiphorst, Roelof; Hoeksema, F.W.; Slump, Cornelis H.

    2003-01-01

    Flexible radio receivers are also called Software Defined Radios (SDRs) [1], [2]. The focus of our SDR project [3] is on designing the front end, from antenna to demodulation in bits, of a °exible, multi-standard WLAN receiver. We try to combine an instance of a (G)FSK receiver (Bluetooth) with an

  6. Modelling the Implications of Quality Management Elements on Strategic Flexibility

    Directory of Open Access Journals (Sweden)

    Ana Belén Escrig-Tena

    2011-01-01

    Full Text Available This paper presents a theoretical and empirical analysis of the implications of a quality management (QM initiative on strategic flexibility. Our study defines flexibility from a strategic approach and examines the extent to which, why, and how the triggering factors of strategic flexibility are related to QM elements. The hypotheses put forward are tested in an empirical study carried out on a sample of Spanish firms, using structural equation models. The results demonstrate the positive effect of adopting an integral QM initiative on enhancing strategic flexibility. QM enhances strategic flexibility more effectively when it is introduced comprehensively rather than in a piecemeal fashion. A series of practices linked to the application of a QM initiative are outlined, which managers can use to improve strategic flexibility. The approach used in the study can be applied to analyse other antecedents of flexibility and to propose possible studies that consider QM as an antecedent of other organisational variables.

  7. "Central Station" Londonis

    Index Scriptorium Estoniae

    2000-01-01

    Londoni galeriis Milch seitsme läti, leedu ja eesti kunstniku projekt "Central Station". Kuraatorid Lisa Panting, Sally Tallant. Eestist osalevad Hanno Soans (Catarina Campinoga koostöös valminud video), Kiwa, Kai Kaljo

  8. Active Marine Station Metadata

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Active Marine Station Metadata is a daily metadata report for active marine bouy and C-MAN (Coastal Marine Automated Network) platforms from the National Data...

  9. Electrostatic pickup station

    CERN Multimedia

    CERN PhotoLab

    1982-01-01

    Electrostatic pickup station, with 4 interleaved electrodes, to measure beam position in the horizontal and vertical plane. This type is used in the transfer lines leaving the PS (TT2, TT70, TTL2). See also 7904075.

  10. Public Transit Stations

    Data.gov (United States)

    Department of Homeland Security — fixed rail transit stations within the Continental United States, Alaska, Hawaii, the District of Columbia, and Puerto Rico. The modes of transit that are serviced...

  11. Mukilteo Research Station

    Data.gov (United States)

    Federal Laboratory Consortium — Research at the Mukilteo Research Station focuses on understanding the life cycle of marine species and the impacts of ecosystem stressors on anadromous and marine...

  12. Maine Field Station

    Data.gov (United States)

    Federal Laboratory Consortium — In 2000 NOAA's National Marine Fisheries Service established the Maine Field Station in Orono, ME to have more direct involvement in the conservation of the living...

  13. FEMA DFIRM Station Start

    Data.gov (United States)

    Minnesota Department of Natural Resources — This table contains information about station starting locations. These locations indicate the reference point that was used as the origin for distance measurements...

  14. Natural Weathering Exposure Station

    Data.gov (United States)

    Federal Laboratory Consortium — The Corps of Engineers' Treat Island Natural Weathering Exposure Station is a long-term natural weathering facility used to study concrete durability. Located on the...

  15. Routes and Stations

    Data.gov (United States)

    Department of Homeland Security — he Routes_Stations table is composed of fixed rail transit systems within the Continental United States, Alaska, Hawaii, the District of Columbia, and Puerto Rico....

  16. USRCRN Station Information

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Documentation of United States Regional Climate Reference Network (USRCRN) installations in 2009. Installations documented are for USRCRN pilot project stations in...

  17. Haptic control of a pneumatic muscle actuator to provide resistance for simulated isokinetic exercise: Part I--dynamic test station and human quadriceps dynamic simulator.

    Science.gov (United States)

    Hall, Kara L; Phillips, Chandler A; Reynolds, David B; Mohler, Stanley R; Rogers, Dana B; Neidhard-Doll, Amy T

    2014-01-01

    Pneumatic muscle actuators (PMAs) have a high power to weight ratio and possess unique characteristics which make them ideal actuators for applications involving human interaction. PMAs are difficult to control due to nonlinear dynamics, presenting challenges in system implementation. Despite these challenges, PMAs have great potential as a source of resistance for strength training and rehabilitation. The objective of this work was to control a PMA for use in isokinetic exercise, potentially benefiting anyone in need of optimal strength training through a joint's range of motion. A human quadriceps dynamic simulator (HQDS) was developed so that control effectiveness and accommodation could be tested prior to human implementation. The experimental set-up and HQDS are discussed in Part I of this work. The development of a PMA haptic controller and its interaction with the HQDS are discussed in Part II.

  18. Gas Stations, US, 2010, NAVTEQ

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Gas_Stations dataset is derived from the Navteq 'AUTOSVC' SDC layer (FAC_TYPE=5540) and contains gas stations and petrol stations. This NAVTEQ dataset is...

  19. Enhanced Master Station History Report

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Enhanced Master Station History Report (EMSHR) is a compiled list of basic, historical information for every station in the station history database, beginning...

  20. Tobruk power station

    Energy Technology Data Exchange (ETDEWEB)

    Boergardts, B

    1978-01-01

    In February of 1975, the Electricity Corporation Benghazi (ECB) awarded a contract for the construction of a turnkey power station and seawater desalination plant in Tobruk, Libya to a consortium under the leadership of BBC Mannheim. This power station has an output of 129 MW and supplies about 24,000 m/sup 3/ of drinking water daily. It went into operation in 1977, two and a half years after the contract was awarded.

  1. Leadership at Antarctic Stations.

    Science.gov (United States)

    1987-03-01

    Claseification 6. No. Pegees LEADERSHIP AT ANTARTIC STATIONS hxIs i4 5, C =r~eta(C), 17 Rfs~W (R, Udusiied U)J 7. No Refs 8. Author(s) Edocumesnt I...whether there is a "best" approach to leadership at an Antartic Station and what leadership style may have the most to offer. 3~~ __ ___ Tipesis to be

  2. The Princess Elisabeth Station

    Science.gov (United States)

    Berte, Johan

    2012-01-01

    Aware of the increasing impact of human activities on the Earth system, Belgian Science Policy Office (Belspo) launched in 1997 a research programme in support of a sustainable development policy. This umbrella programme included the Belgian Scientific Programme on Antarctic Research. The International Polar Foundation, an organization led by the civil engineer and explorer Alain Hubert, was commissioned by the Belgian Federal government in 2004 to design, construct and operate a new Belgian Antarctic Research Station as an element under this umbrella programme. The station was to be designed as a central location for investigating the characteristic sequence of Antarctic geographical regions (polynia, coast, ice shelf, ice sheet, marginal mountain area and dry valleys, inland plateau) within a radius of 200 kilometers (approx.124 miles) of a selected site. The station was also to be designed as "state of the art" with respect to sustainable development, energy consumption, and waste disposal, with a minimum lifetime of 25 years. The goal of the project was to build a station and enable science. So first we needed some basic requirements, which I have listed here; plus we had to finance the station ourselves. Our most important requirement was that we decided to make it a zero emissions station. This was both a philosophical choice as we thought it more consistent with Antarctic Treaty obligations and it was also a logistical advantage. If you are using renewable energy sources, you do not have to bring in all the fuel.

  3. Multipurpose modular experimental station for the DiProI beamline of Fermi-Elettra free electron laser

    Energy Technology Data Exchange (ETDEWEB)

    Pedersoli, Emanuele; Capotondi, Flavio; Cocco, Daniele; Kaulich, Burkhard; Menk, Ralf H; Locatelli, Andrea; Mentes, Tevfik O; Spezzani, Carlo; Sandrin, Gilio; Bacescu, Daniel M; Kiskinova, Maya [Fermi, Elettra Sincrotrone Trieste, SS 14 - km 163.5, 34149 Basovizza, Trieste (Italy); Zangrando, Marco [Fermi, Elettra Sincrotrone Trieste, SS 14 - km 163.5, 34149 Basovizza, Trieste (Italy); IOM CNR, Laboratorio TASC, SS 14 - km 163.5, 34149 Basovizza, Trieste (Italy); Bajt, Sasa; Barthelmess, Miriam [Photon Science, DESY, Notkestrasse 85, 22607 Hamburg (Germany); Barty, Anton; Schulz, Joachim; Gumprecht, Lars [Centre for Free-Electron Laser Science, DESY, Notkestrasse 85, 22607 Hamburg (Germany); Chapman, Henry N [Centre for Free-Electron Laser Science, DESY, Notkestrasse 85, 22607 Hamburg (Germany); University of Hamburg, Notkestrasse 85, 22607 Hamburg (Germany); Nelson, A J; Frank, Matthias [Physical and Life Sciences, LLNL, 7000 East Avenue, Livermore, California 94550 (United States); others, and

    2011-04-15

    We present a compact modular apparatus with a flexible design that will be operated at the DiProI beamline of the Fermi-Elettra free electron laser (FEL) for performing static and time-resolved coherent diffraction imaging experiments, taking advantage of the full coherence and variable polarization of the short seeded FEL pulses. The apparatus has been assembled and the potential of the experimental setup is demonstrated by commissioning tests with coherent synchrotron radiation. This multipurpose experimental station will be open to general users after installation at the Fermi-Elettra free electron laser in 2011.

  4. Multipurpose modular experimental station for the DiProI beamline of Fermi-Elettra free electron laser

    International Nuclear Information System (INIS)

    Pedersoli, Emanuele; Capotondi, Flavio; Cocco, Daniele; Kaulich, Burkhard; Menk, Ralf H.; Locatelli, Andrea; Mentes, Tevfik O.; Spezzani, Carlo; Sandrin, Gilio; Bacescu, Daniel M.; Kiskinova, Maya; Zangrando, Marco; Bajt, Sasa; Barthelmess, Miriam; Barty, Anton; Schulz, Joachim; Gumprecht, Lars; Chapman, Henry N.; Nelson, A. J.; Frank, Matthias

    2011-01-01

    We present a compact modular apparatus with a flexible design that will be operated at the DiProI beamline of the Fermi-Elettra free electron laser (FEL) for performing static and time-resolved coherent diffraction imaging experiments, taking advantage of the full coherence and variable polarization of the short seeded FEL pulses. The apparatus has been assembled and the potential of the experimental setup is demonstrated by commissioning tests with coherent synchrotron radiation. This multipurpose experimental station will be open to general users after installation at the Fermi-Elettra free electron laser in 2011.

  5. Pengujian sifat unggul beberapa klon harapan kopi arabika di kebun percobaan Andungsari, Jawa Timur (Testing for superior traits of some arabica coffee promising clones at Andungsari research station, East Java

    Directory of Open Access Journals (Sweden)

    Retno Hulupi

    2012-08-01

    Full Text Available One of the major diseases which limiting production in arabica coffee is the leaf rust caused by the fungus Hemileia vastatrix, B et Br. Selection and testing on thirteen promising arabica coffee clones were carried out at endemic area for leaf rust disease, Andungsari Research Station, for six fruiting times. The aims of these test were to find out superior planting material as clone with genetic resistance to leaf rust. As the beverage commodities, criterium selections for superiority clone besides resistant to leaf rust and yielding ability of more than 1,5 ton/ha also must be excellent in cup quality. Under this consideration, BP 416 A clone showed as the best high yielding ability i.e. 1,595 kg/ha and stable, besides resistant to leaf rust disease compared to the other clones tested. This clone had good cup quality, better than earlier released variety such as USDA 762 and S 795 although was not better than Andungsari 1 that were planted in the same location. The best physical bean characteristics was obtained on BP 513 A clone wich is derived from S 795 x Caturra red, having 89.2% of normal bean and 18.3% outurn characteristics. However, due to lower yielding and more susceptible to leaf rust, this clone could not be classified as superior clone.

  6. Software development assurance for special control computer sets on the base of the Electronica-60M microcomputer in the stations of fuel element nondestructive testing

    International Nuclear Information System (INIS)

    Vasil'kova, A.D.; Grachev, S.N.; Salakatova, L.S.

    1987-01-01

    A special computational control complex (SCCC) including the ''Elektronika-60M'' microcomputer, a device for communication with an object (DCO) based on the typical microprocessing set (TMS) based on LIUS-2 KTS means and an adapter for communication of the ''Elektronika-60M'' microcomputer bus with IK1 TMS bus developed for their conjugation is used for development of nondestructive control post software. An instrumental SCCC including SM-4 microcomputer, TMS units as DCO, an adapter for communication of the common bus of the SM-4 minicomputer with the IK1 TMS bus developed for their conjugation and devices for simulation of the facility operation is suggested to increase labour productivity of programmers. The SM-4 microcomputer permits to develop programs in the FORTRAN language and to carry out their effective adjustment. A subprogram library for communication with TMS units is compiled, and the technique for testing FORTRAN programs in programmable read-only memory TMS as well as start of these programs are developed

  7. Automation of Precise Time Reference Stations (PTRS)

    Science.gov (United States)

    Wheeler, P. J.

    1985-04-01

    The U.S. Naval Observatory is presently engaged in a program of automating precise time stations (PTS) and precise time reference stations (PTBS) by using a versatile mini-computer controlled data acquisition system (DAS). The data acquisition system is configured to monitor locally available PTTI signals such as LORAN-C, OMEGA, and/or the Global Positioning System. In addition, the DAS performs local standard intercomparison. Computer telephone communications provide automatic data transfer to the Naval Observatory. Subsequently, after analysis of the data, results and information can be sent back to the precise time reference station to provide automatic control of remote station timing. The DAS configuration is designed around state of the art standard industrial high reliability modules. The system integration and software are standardized but allow considerable flexibility to satisfy special local requirements such as stability measurements, performance evaluation and printing of messages and certificates. The DAS operates completely independently and may be queried or controlled at any time with a computer or terminal device (control is protected for use by authorized personnel only). Such DAS equipped PTS are operational in Hawaii, California, Texas and Florida.

  8. The risk of leukaemia in young children from exposure to tritium and carbon-14 in the discharges of German nuclear power stations and in the fallout from atmospheric nuclear weapons testing.

    Science.gov (United States)

    Wakeford, Richard

    2014-05-01

    Towards the end of 2007, the results were published from a case-control study (the "KiKK Study") of cancer in young children, diagnosed study found a tendency for cases of leukaemia to live closer to the nearest nuclear power station than their matched controls, producing an odds ratio that was raised to a statistically significant extent for residence within 5 km of a nuclear power station. The findings of the study received much publicity, but a detailed radiological risk assessment demonstrated that the radiation doses received by young children from discharges of radioactive material from the nuclear reactors were much lower than those received from natural background radiation and far too small to be responsible for the statistical association reported in the KiKK Study. This has led to speculation that conventional radiological risk assessments have grossly underestimated the risk of leukaemia in young children posed by exposure to man-made radionuclides, and particular attention has been drawn to the possible role of tritium and carbon-14 discharges in this supposedly severe underestimation of risk. Both (3)H and (14)C are generated naturally in the upper atmosphere, and substantial increases in these radionuclides in the environment occurred as a result of their production by atmospheric testing of nuclear weapons during the late 1950s and early 1960s. If the leukaemogenic effect of these radionuclides has been seriously underestimated to the degree necessary to explain the KiKK Study findings, then a pronounced increase in the worldwide incidence of leukaemia among young children should have followed the notably elevated exposure to (3)H and (14)C from nuclear weapons testing fallout. To investigate this hypothesis, the time series of incidence rates of leukaemia among young children risk of leukaemia in young children following the peak of above-ground nuclear weapons testing, or that incidence rates are related to level of exposure to fallout, is

  9. Energy Flexibility in Retail Buildings

    DEFF Research Database (Denmark)

    Ma, Zheng; Billanes, Joy Dalmacio; Kjærgaard, Mikkel Baun

    2017-01-01

    Retail buildings has an important role for demand side energy flexibility because of their high energy consumption, variety of energy flexibility resources, and centralized control via building control systems. Energy flexibility requires agreements and collaborations among different actors......), with the discussion of the stakeholders’ roles and their interrelation in delivering energy flexibility with the influential factors to the actual implementation of energy flexible operation of their buildings. Based on a literature analysis, the results cover stakeholders’ types and roles, perceptions (drivers......, barriers, and benefits), energy management activities and technology adoptions, and the stakeholders’ interaction for the energy flexibility in retail buildings....

  10. Seismometer array station processors

    International Nuclear Information System (INIS)

    Key, F.A.; Lea, T.G.; Douglas, A.

    1977-01-01

    A description is given of the design, construction and initial testing of two types of Seismometer Array Station Processor (SASP), one to work with data stored on magnetic tape in analogue form, the other with data in digital form. The purpose of a SASP is to detect the short period P waves recorded by a UK-type array of 20 seismometers and to edit these on to a a digital library tape or disc. The edited data are then processed to obtain a rough location for the source and to produce seismograms (after optimum processing) for analysis by a seismologist. SASPs are an important component in the scheme for monitoring underground explosions advocated by the UK in the Conference of the Committee on Disarmament. With digital input a SASP can operate at 30 times real time using a linear detection process and at 20 times real time using the log detector of Weichert. Although the log detector is slower, it has the advantage over the linear detector that signals with lower signal-to-noise ratio can be detected and spurious large amplitudes are less likely to produce a detection. It is recommended, therefore, that where possible array data should be recorded in digital form for input to a SASP and that the log detector of Weichert be used. Trial runs show that a SASP is capable of detecting signals down to signal-to-noise ratios of about two with very few false detections, and at mid-continental array sites it should be capable of detecting most, if not all, the signals with magnitude above msub(b) 4.5; the UK argues that, given a suitable network, it is realistic to hope that sources of this magnitude and above can be detected and identified by seismological means alone. (author)

  11. NRC/UBC fuelling station with intelligent compression

    International Nuclear Information System (INIS)

    Dada, A.; Boyd, B.; Law, L.; Semczyszyn, D.

    2004-01-01

    BOC Canada Ltd. will design, integrate and construct the second fueling station on the Hydrogen Highway. This station will be located at the National Research Council's Institute for Fuel Cell Innovation on the campus of the University of British Columbia. BOC's design will bring together an existing alkaline electrolyser, new compression, storage and dispensing. The station will be designed to serve fuel cell passenger vehicles using 350-bar storage. However, the flexible design concept will allow for many other user needs including the potential for servicing larger vehicles, as well as filling portable storage systems for use at satellite stations. The novel station design also offers the potential to fuel from multiple hydrogen sources. Together with NRC, this fueling station will be used to increase public, consumer and investor awareness of hydrogen technologies. Design and construction of this facility will assist in the development of industry codes and standards and familiarize authorities having jurisdiction with hydrogen fueling. The system concept offers the utmost attention to safety, novelty and flexibility. (author)

  12. Toluene stability Space Station Rankine power system

    Science.gov (United States)

    Havens, V. N.; Ragaller, D. R.; Sibert, L.; Miller, D.

    1987-01-01

    A dynamic test loop is designed to evaluate the thermal stability of an organic Rankine cycle working fluid, toluene, for potential application to the Space Station power conversion unit. Samples of the noncondensible gases and the liquid toluene were taken periodically during the 3410 hour test at 750 F peak temperature. The results obtained from the toluene stability loop verify that toluene degradation will not lead to a loss of performance over the 30-year Space Station mission life requirement. The identity of the degradation products and the low rates of formation were as expected from toluene capsule test data.

  13. Flexible cryogenic conduit

    International Nuclear Information System (INIS)

    Brindza, P.D.; Wines, R.R.; Takacs, J.J.

    1999-01-01

    A flexible and relatively low cost cryogenic conduit is described. The flexible cryogenic conduit of the present invention comprises a first inner corrugated tube with single braided serving, a second outer corrugated tube with single braided serving concentric with the inner corrugated tube, and arranged outwardly about the periphery of the inner corrugated tube and between the inner and outer corrugated tubes: a superinsulation layer; a one half lap layer of polyester ribbon; a one half lap layer of copper ribbon; a spirally wound refrigeration tube; a second one half lap layer of copper ribbon; a second one half lap layer of polyester ribbon; a second superinsulation layer; a third one half lap layer of polyester ribbon; and a spirally wound stretchable and compressible filament

  14. Flexible training under threat.

    Science.gov (United States)

    Houghton, Anita; Eaton, Jennifer

    2002-10-01

    As the number of women in medicine and the general demand for a better work-life balance rises, flexible training is an increasingly important mechanism for maintaining the medical workforce. The new pay deal, together with entrenched cultural attitudes, are potential threats. Ways forward include more substantive part-time posts, more part-time opportunities at consultant level, and using positive experiences as a way of tackling attitudes in the less accepting specialties.

  15. Flexible weapons architecture design

    OpenAIRE

    Pyant, William C.

    2015-01-01

    Present day air-delivered weapons are of a closed architecture, with little to no ability to tailor the weapon for the individual engagement. The closed architectures require weaponeers to make the target fit the weapon instead of fitting the individual weapons to a target. The concept of a flexible weapons aims to modularize weapons design using an open architecture shell into which different modules are inserted to achieve the desired target fractional damage while reducing cost and civilia...

  16. Industrial Fuel Flexibility Workshop

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2006-09-01

    On September 28, 2006, in Washington, DC, ITP and Booz Allen Hamilton conducted a fuel flexibility workshop with attendance from various stakeholder groups. Workshop participants included representatives from the petrochemical, refining, food and beverage, steel and metals, pulp and paper, cement and glass manufacturing industries; as well as representatives from industrial boiler manufacturers, technology providers, energy and waste service providers, the federal government and national laboratories, and developers and financiers.

  17. Flexible Land Administration

    DEFF Research Database (Denmark)

    Enemark, Stig

    2014-01-01

    Security of tenure is widely considered to be the missing piece of the puzzle when it comes to eradication of poverty. And, as explained in the previous issue of Geoinformatics, the European Union is now placing land rights at the heart of EU development policy. This article presents a way forwar...... in terms of building flexible and "fit-for-purpose" land administration systems in developing countries. This will ensure security of tenure for all and sustainable management of the use of land....

  18. Stage measurement at gaging stations

    Science.gov (United States)

    Sauer, Vernon B.; Turnipseed, D. Phil

    2010-01-01

    Stream and reservoir stage are critical parameters in the computation of stream discharge and reservoir volume, respectively. In addition, a record of stream stage is useful in the design of structures that may be affected by stream elevation, as well as for the planning for various uses of flood plains. This report describes equipment and methodology for the observation, sensing, and recording of stage in streams and reservoirs. Although the U.S. Geological Survey (USGS) still uses the traditional, basic stilling-well float system as a predominant gaging station, modern electronic stage sensors and water-level recorders are now commonly used. Bubble gages coupled with nonsubmersible pressure transducers eliminate the need for stilling wells. Submersible pressure transducers have become common in use for the measurement of stage in both rivers and lakes. Furthermore, noncontact methods, such as radar, acoustic, and laser methods of sensing water levels, are being developed and tested, and in the case of radar, are commonly used for the measurement of stage. This report describes commonly used gaging-station structures, as well as the design and operation of gaging stations. Almost all of the equipment and instruments described in this report will meet the accuracy standard set by the USGS Office of Surface Water (OSW) for the measurement of stage for most applications, which is ±0.01 foot (ft) or 0.2 percent of the effective stage. Several telemetry systems are used to transmit stage data from the gaging station to the office, although satellite telemetry has become the standard. These telemetry systems provide near real-time stage data, as well as other information that alerts the hydrographer to extreme or abnormal events, and instrument malfunctions.

  19. PTFE films with improved flexibility

    Science.gov (United States)

    Muraca, R. F.; Koch, A. A.

    1972-01-01

    Development and application of flexible polytetrafluroethylene films for expulsion bladders in spacecraft propellant tanks are described. Flexibility of material is obtained by reducing crystallinity through annealing and quenching in water. Physical and mechanical properties of material are presented.

  20. Study of the mechanical properties of the electric power station components: the punch test; Etude des proprietes mecaniques des composants de centrales thermiques: l'essai punch test

    Energy Technology Data Exchange (ETDEWEB)

    Isselin, J

    2003-03-15

    The aging of the electric production park implies an increasing need of knowledge concerning the evolution of the mechanical properties of its components. With regard to this problem, the availability in material is more and more small. This work proposes to characterize these properties through a mechanical test called Punch test. The main characteristic of this test is to use very small volume samples. The development of this test has been carried out by the study of a 15 MDV 4-05 steel coming from a steam drum of a thermal power plant after 145000 hours of service. At first, we have measured the influence of the parameters of this test. Then, the study has dealt more particularly on the transition temperature of the material. With the finite element simulation method, the strain hardening coefficient of the material has been determined. (O.M.)

  1. Flexible automated manufacturing for SMEs

    DEFF Research Database (Denmark)

    Grube Hansen, David; Bilberg, Arne; Madsen, Erik Skov

    2017-01-01

    SMEs are in general highly flexible and agile in order to accommodate the customer demands in the paradigm of High Mix-Low Volume manufacturing. The flexibility and agility have mainly been enabled by manual labor, but as we are entering the technology and data driven fourth industrial revolution......, where augmented operators and machines work in cooperation in a highly flexible and productive manufacturing system both an opportunity and a need has raised for developing highly flexible and efficient automation....

  2. Innovation in wearable and flexible antennas

    CERN Document Server

    Khaleel, Haider

    2014-01-01

    This book covers the design, numerical simulation, state of the art fabrication processes, qualitative and quantitative tests, and measurement techniques of wearable and flexible antennas of various topologies, such as: Printed Monopoles, Micropoles and Microstrips. It serves as a vital reference source for scientists and engineers in this field.

  3. Cognitive Flexibility in Obsessive Compulsive Disorder

    DEFF Research Database (Denmark)

    Jónsson, Hjalti; Salkovskis, Paul M.

    BT for problems such as OCD requires a level of cognitive flexibility (that is the ability to take a different perspective on ones problems). It could be argued that problems in set shifting (by neuropsychological tests) might underpin problems in this area. Two assessments were used (1: perception...

  4. Flexible energy conversion

    International Nuclear Information System (INIS)

    Griepentrog, H.

    1975-01-01

    A helium turbine was started up at the Oberhausen heating power station in December 1974. The practical experience with this system will be useful later for helium-cooled HTR type reactors with gas turbines in the coolant loop. The first report in VDI-Nachrichten 11/75 is followed below by a detailed description of the Oberhausen pilot plant. (orig./AK) [de

  5. Hydrogen Fuelling Stations

    DEFF Research Database (Denmark)

    Rothuizen, Erasmus Damgaard

    . A system consisting of one high pressure storage tank is used to investigate the thermodynamics of fuelling a hydrogen vehicle. The results show that the decisive parameter for how the fuelling proceeds is the pressure loss in the vehicle. The single tank fuelling system is compared to a cascade fuelling......This thesis concerns hydrogen fuelling stations from an overall system perspective. The study investigates thermodynamics and energy consumption of hydrogen fuelling stations for fuelling vehicles for personal transportation. For the study a library concerning the components in a hydrogen fuelling...... station has been developed in Dymola. The models include the fuelling protocol (J2601) for hydrogen vehicles made by Society of Automotive Engineers (SAE) and the thermodynamic property library CoolProp is used for retrieving state point. The components in the hydrogen fuelling library are building up...

  6. Designing structural supply chain flexibility

    NARCIS (Netherlands)

    Mulinski, Ksawery Jan

    2012-01-01

    In a continuously changing business environment the role of supply chain flexibility is constantly increasing. A flexible supply chain can ensure survival in quickly changing market conditions as well as enable sustainable growth. This thesis explores the topic of supply chain flexibility with focus

  7. Global Analysis of Flexible Risers

    DEFF Research Database (Denmark)

    Banke, Lars

    1996-01-01

    Flexible pipes are often a technically attractive alternative to the traditional steel pipe. Often commercial utilisation of oil/gas fields depends on the use of flexible pipes. An example is when floating production vessels are used, where the flexible pipe follows the wave induced motions...

  8. Hydrogen vehicle fueling station

    Energy Technology Data Exchange (ETDEWEB)

    Daney, D.E.; Edeskuty, F.J.; Daugherty, M.A. [Los Alamos National Lab., NM (United States)] [and others

    1995-09-01

    Hydrogen fueling stations are an essential element in the practical application of hydrogen as a vehicle fuel, and a number of issues such as safety, efficiency, design, and operating procedures can only be accurately addressed by a practical demonstration. Regardless of whether the vehicle is powered by an internal combustion engine or fuel cell, or whether the vehicle has a liquid or gaseous fuel tank, the fueling station is a critical technology which is the link between the local storage facility and the vehicle. Because most merchant hydrogen delivered in the US today (and in the near future) is in liquid form due to the overall economics of production and delivery, we believe a practical refueling station should be designed to receive liquid. Systems studies confirm this assumption for stations fueling up to about 300 vehicles. Our fueling station, aimed at refueling fleet vehicles, will receive hydrogen as a liquid and dispense it as either liquid, high pressure gas, or low pressure gas. Thus, it can refuel any of the three types of tanks proposed for hydrogen-powered vehicles -- liquid, gaseous, or hydride. The paper discusses the fueling station design. Results of a numerical model of liquid hydrogen vehicle tank filling, with emphasis on no vent filling, are presented to illustrate the usefulness of the model as a design tool. Results of our vehicle performance model illustrate our thesis that it is too early to judge what the preferred method of on-board vehicle fuel storage will be in practice -- thus our decision to accommodate all three methods.

  9. An Annotated Bibliography of High-Voltage Direct-Current Transmission and Flexible AC Transmission (FACTS) Devices, 1991-1993.

    Energy Technology Data Exchange (ETDEWEB)

    Litzenberger, Wayne; Lava, Val

    1994-08-01

    References are contained for HVDC systems, converter stations and components, overhead transmission lines, cable transmission, system design and operations, simulation of high voltage direct current systems, high-voltage direct current installations, and flexible AC transmission system (FACTS).

  10. Space Station Habitability Research

    Science.gov (United States)

    Clearwater, Yvonne A.

    1988-01-01

    The purpose and scope of the Habitability Research Group within the Space Human Factors Office at the NASA/Ames Research Center is described. Both near-term and long-term research objectives in the space human factors program pertaining to the U.S. manned Space Station are introduced. The concept of habitability and its relevancy to the U.S. space program is defined within a historical context. The relationship of habitability research to the optimization of environmental and operational determinants of productivity is discussed. Ongoing habitability research efforts pertaining to living and working on the Space Station are described.

  11. Training of engineers for nuclear power station operation

    International Nuclear Information System (INIS)

    Myerscough, P.B.

    1980-01-01

    The requirements for staffing and training of a nuclear electric utility are described. Current training facilities at the Central Electricity Generating Board are applicable to gas-cooled technology with the possibility of the introduction of a thermal water system and fast reactors in the future. The CEGB training centres provide for the initial training of operational staff, revision training of experienced operational staff, and training of non-operational staff from the stations and supporting departments. Details are given of the content of the training courses which also provide simulation facilities of the basic dynamics of the CEGB stations. Further developments in simulation will include dynamics of the boiler and turbine plants in Magnox stations. The flexibility of the AGR simulations will enable the training exercises to be adjusted to meet changing operating patterns for each AGR station. (U.K.)

  12. GPS Test Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Global Positioning System (GPS) Test Facility Instrumentation Suite (GPSIS) provides great flexibility in testing receivers by providing operational control of...

  13. Tunnel flexibility effect on the ground surface acceleration response

    Science.gov (United States)

    Baziar, Mohammad Hassan; Moghadam, Masoud Rabeti; Choo, Yun Wook; Kim, Dong-Soo

    2016-09-01

    Flexibility of underground structures relative to the surrounding medium, referred to as the flexibility ratio, is an important factor that influences their dynamic interaction. This study investigates the flexibility effect of a box-shaped subway tunnel, resting directly on bedrock, on the ground surface acceleration response using a numerical model verified against dynamic centrifuge test results. A comparison of the ground surface acceleration response for tunnel models with different flexibility ratios revealed that the tunnels with different flexibility ratios influence the acceleration response at the ground surface in different ways. Tunnels with lower flexibility ratios have higher acceleration responses at short periods, whereas tunnels with higher flexibility ratios have higher acceleration responses at longer periods. The effect of the flexibility ratio on ground surface acceleration is more prominent in the high range of frequencies. Furthermore, as the flexibility ratio of the tunnel system increases, the acceleration response moves away from the free field response and shifts towards the longer periods. Therefore, the flexibility ratio of the underground tunnels influences the peak ground acceleration (PGA) at the ground surface, and may need to be considered in the seismic zonation of urban areas.

  14. Application of carbon nanotubes flexible strain sensor in smart textiles

    Directory of Open Access Journals (Sweden)

    Qiong CHENG

    2017-10-01

    Full Text Available Smart textiles have not only the necessary functions of daily wear, but also the intelligence. The focus of the current textile materials research is the selection of flexible material. For flexible materials, carbon material is one of the ideal materials for preparing flexible strain gauges. The application of flexible strain sensor prepared by carbon nanotubes as a flexible material in smart textiles is the research content. The research status of carbon nanotubes flexible strain sensor is introduced from the aspects of the structure, properties and application. The characteristics and functions of flexible strain gages prepared with carbon nanotube fibers and carbon nanotube films as flexible materials are discussed in terms of selection, preparation method, performance test and application. At the same time, the advantages and disadvantages of the flexible strain sensor of carbon nanotubes are reviewed from the aspects of preparation difficulty, production cost and practical application effect. High sensitivity with high strain will be a key research direction for carbon nanotube flexible strain sensors.

  15. Scaling of the dynamics of flexible Lennard-Jones chains

    DEFF Research Database (Denmark)

    Veldhorst, Arno; Dyre, J. C.; Schrøder, Thomas

    2014-01-01

    functions of excess entropy) which has been observed in simulations of both molecular and polymeric systems. Doing molecular dynamics simulations of flexible Lennard-Jones chains (LJC) with rigid bonds, we here provide the first detailed test of the isomorph theory applied to flexible chain molecules. We...

  16. The immediate effect of vibration therapy on flexibility in female ...

    African Journals Online (AJOL)

    The immediate effect of vibration therapy on flexibility in female junior elite gymnasts. ... Therefore, the aim of this study was to investigate the acute effects of vibration therapy on the flexibility of female gymnasts. A pre-test ... Keywords: Static stretching, vibration training, vibration therapy, acute effect, artistic gymnastics.

  17. Cognitive flexibility in young children: General or task-specific capacity?

    Science.gov (United States)

    Deák, Gedeon O; Wiseheart, Melody

    2015-10-01

    Cognitive flexibility is the ability to adapt to changing tasks or problems. To test whether cognitive flexibility is a coherent cognitive capacity in young children, we tested 3- to 5-year-olds' performance on two forms of task switching, rule-based (Three Dimension Changes Card Sorting, 3DCCS) and inductive (Flexible Induction of Meaning-Animates and Objects, FIM-Ob and FIM-An), as well as tests of response speed, verbal working memory, inhibition, and reasoning. Results suggest that cognitive flexibility is not a globally coherent trait; only the two inductive word-meaning (FIM) tests showed high inter-test coherence. Task- and knowledge-specific factors also determine children's flexibility in a given test. Response speed, vocabulary size, and causal reasoning skills further predicted individual and age differences in flexibility, although they did not have the same predictive relation with all three flexibility tests. Copyright © 2015 Elsevier Inc. All rights reserved.

  18. Power station instrumentation

    International Nuclear Information System (INIS)

    Jervis, M.W.

    1993-01-01

    Power stations are characterized by a wide variety of mechanical and electrical plant operating with structures, liquids and gases working at high pressures and temperatures and with large mass flows. The voltages and currents are also the highest that occur in most industries. In order to achieve maximum economy, the plant is operated with relatively small margins from conditions that can cause rapid plant damage, safety implications, and very high financial penalties. In common with other process industries, power stations depend heavily on control and instrumentation. These systems have become particularly significant, in the cost-conscious privatized environment, for providing the means to implement the automation implicit in maintaining safety standards, improving generation efficiency and reducing operating manpower costs. This book is for professional instrumentation engineers who need to known about their use in power stations and power station engineers requiring information about the principles and choice of instrumentation available. There are 8 chapters; chapter 4 on instrumentation for nuclear steam supply systems is indexed separately. (Author)

  19. Shippingport Station Decommissioning Project

    International Nuclear Information System (INIS)

    1989-01-01

    This Topical Report is a synopsis of the decontamination of plant components and structures at the Shippingport Station Decommissioning Project (SSDP). The information is provided as a part of the Technology Transfer Program to document the preparation activities in support of the shipment of radioactive wastes and the unconditional release of the site and structural materials. 1 ref., 16 figs., 4 tabs

  20. Galileo Station Keeping Strategy

    Science.gov (United States)

    Perez-Cambriles, Antonio; Bejar-Romero, Juan Antonio; Aguilar-Taboada, Daniel; Perez-Lopez, Fernando; Navarro, Daniel

    2007-01-01

    This paper presents analyses done for the design and implementation of the Maneuver Planning software of the Galileo Flight Dynamics Facility. The station keeping requirements of the constellation have been analyzed in order to identify the key parameters to be taken into account in the design and implementation of the software.