WorldWideScience

Sample records for finnish nuclear plant

  1. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1993-06-01

    Quarterly reports on the operation of Finnish nuclear power plants describe events and observations, relating to nuclear and radiation safety, which the Finnish Centre for Radiation and Nuclear Safety considers significant. Also other events of general interest are reported. The reports also include a summary of the radiation safety of plant personnel and the environment, as well as tabulated data on the plants' production and load factors

  2. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1993-03-01

    Quarterly reports on the operation of Finnish nuclear power plants describe events and observations, relating to nuclear and radiation safety, which the Finnish Centre for Radiation and Nuclear Safety considers safety significant. Also other events of general interest are reported. The reports also include a summary of the radiation safety of plant personnel and the environment, as well as tabulated data on the plants' production and load factors

  3. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1994-06-01

    Quarterly reports on the operation of the Finnish NPPs describe nuclear and radiation safety related events and observations which the Finnish Centre for Radiation and Nuclear Safety considers significant. Safety improvements at the plants and general matters relating to the use of nuclear energy are also reported. A summary of the radiation safety of plant personnel and the environment, and tabulated data on the plants' production and load factors are also given. One event during the last quarter of 1993 was rated on the International Nuclear Event Scale (INES) as level 1. During this event at Loviisa 2, the secondary circuit emergency feedwater system was erroneously isolated from automatic start-up readiness. The error went unnoticed for 4.5 hours. During 1993 one level 2 incident and three level 1 incidents occurred at the Finnish NPPs. (8 figs., 4 tabs.)

  4. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    1988-04-01

    This general review of the operation of the Finnish nuclear power plants concentrates on such events and discoveries related to nuclear and radiation safety as the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tubulated data on the production and load factors of the plants. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment

  5. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Heimburger, H.

    1988-08-01

    This general review of the operation of the Finnish nuclear power plants concentrates on such events and discoveries related to nuclear and radiation safety as the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tabulated data on the production and load factors of the plants. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment

  6. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Ottosson, C.

    1989-05-01

    This general review of the operation of the Finnish nuclear power plants concentrates on such events and discoveries related to nuclear and radiation safety as the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tabulated data on the production and load factors of the plants. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment

  7. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Haenninen, R.; Koponen, H.; Nevander, O.; Paltemaa, R.; Poellaenen, I.; Rannila, P.; Valtonen, K.; Vilkamo, O.

    1988-02-01

    This general review of the operation of the Finnish nuclear power plants concentrates on such events and discoveries related to nuclear and radiation safety as the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tabulated data on the production and load factors of the plants. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment

  8. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Haenninen, R.

    1988-09-01

    This general review of the operation of the Finnish nuclear power plants concentrates on such events and discoveries related to nuclear and radiation safety as the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tabulated data on the production and load factors of the plants. In the report period, no event essentially degraded plant safety nor posed a radiation hzard to the personnel or the environment

  9. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1991-08-01

    In the Quarterly Reports on the operation of the Finnish nuclear power plants such events and observations are described relating to nuclear and radiation safety which the Finnish Centre for Radiation and Nuclear Safety considers safety significant. Also other events of general interest are reported. The report also includes a summary of the radiation safety of the plants' workers and the environment, as well as tabulated data on the production and load factors of the plants. The Finnish nuclear power plant units Loviisa 1 and 2 as well as TVO I and II were in commercial operation during the whole first quarter of 1991. The load factor average was 99.1 %. Failures have been detected in the uppermost spacing lattices of nuclear fuel bundles removed from the Loviisa nuclear reactors. Further investigations into the significance of the failures have been initiated. In this quarter, renewed cooling systems for the instrumentation area were introduced at Loviisa 1. The modifications made in the systems serve to ensure reliable cooling of the area even during the hottest summer months when the possibility exists that the temperature of the automation equipment could rise too high causing malfunctions which could endanger plant safety. Occupational radiation doses and external releases of radioactivity were below prescribed limits in this quarter. Only small amounts of radioactive substances originating in nuclear power plants were detected in samples taken in the vicinity of nuclear power plants

  10. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Reponen, H.; Viitasaari, O.

    1985-09-01

    These general reviews of the operation of the Finnish nuclear power plants concentrate on such events and discoveries related to reactor and radiation safety that the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as significant. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment. The report also includes a summary of the radiation safety of the personnel and the environment and tabulated data on the production and capacity factors of the plants. (author)

  11. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Lehtinen, P.

    1986-08-01

    These general reviews of the operation of the Finnish nuclear power plants concentrate on such events and discoveries related to reactor and radiation safety that the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tabulated data on the production and load factors of the plants. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment. (author)

  12. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Reponen, H.; Viitasaari, O.; Lehtinen, P.

    1985-11-01

    These general reviews of the operation of the Finnish nuclear power plants concentrate on such events and discoveries related to reactor and radiation safety that the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as significant. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment. The report also includes a summary of the radiation safety of the personnel and the environment and tabulated data on the production and load factors of the plants. (author)

  13. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1990-03-01

    In the Quarterly Reports on the operation of the Finnish nuclear power plants such incidents and observations are described relating to nuclear and radiation safety which the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, considers safety-related. During the third quarter of 1989 the Finnish nuclear power plant units Loviisa 1 and 2 and TVO I and II were in commercial operation for most of the time. Nuclear electricity accounted for 39.0% of the total Finnish electricity production in this quarter. The load factor average of the nuclear power plant units was 78.9%. At Loviisa 1, two holes were found in the feedwater distributor of one steam generator. Corresponding wall thinning corrosion was also detected in the walls of two other distributors. The holes were found on the feedwater distributor upper surface in the joint of the secondary circuit feedwater pipe. One hole was about 20 mm x 50 mm in size and the other was a pit hole ca 5 mm in diameter. Metal power had entered the primary circuit at TVO I. This was observed during a post-scram plant start-up. Several control rod drive units had become jammed so tight that control rod withdrawal failed. Metal powder did not hamper reactor scram under the prevailing circumstances because the drive units are prone to jamming only after a control rod is almost fully inserted and because the forces which insert a control rod by various means (electrical, hydraulic) are 6-8 fold compared with the withdrawing force

  14. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1993-09-01

    Quarterly reports on the operation of Finnish nuclear power plants describe events and observations, relating to nuclear safety and radiation protection which the Finnish Centre for Radiation and Nuclear Safety considers safety significant. Safety-enhancing modifications at the nuclear power plants and issues relating to the use of nuclear energy which are of general interest are also reported. The reports include a summary of the radiation safety of plant personnel and the environment, as well as tabulated data on the production and load factors of the plants. In the first quarter of 1993, a primary feedwater system pipe break occurred at Loviisa 2, in a section of piping after a feedwater pump. The break was erosion-corrosion induced. Repairs and inspections interrupted power generation for seven days. On the International Nuclear Event Scale the event is classified as a level 2 incident. Other events in the first quarter of 1993 had no bearing on nuclear safety and radiation protection

  15. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Reponen, H.; Viitasaari, O.

    1985-01-01

    This general review of the operation of the Finnish nuclear power plants in the second quarter of the year 1984 concentrates on such events and discoveries related to reactor and radiation safety that the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as significant. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment. The report also includes a summary of the radiation safety of the personnel and the environment and tabulated data on the production and availability of the plants. (author)

  16. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Reponen, H.; Viitasaari, O.

    1985-05-01

    This general review of the operation of the Finnish nuclear power plants in the third quarter of the year 1984 concentrates on such events and discoveries related to reactor and radiation safety that the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as significant. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment. The report also includes a summary of the radiation safety of the personnel and the environment and tabulated data on the production and capacity factors of the plants. (author)

  17. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Lehtinen, Pekka

    1987-05-01

    These general reviews of the operation of the Finnish nuclear power plants concentrate on such events and discoveries related to reactor and radiation safety that the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tabulated data on the production and load factors of the plants. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the perssonnel or the environment. For remedying certain defects found in the administrative procedures concerning plant operation and maintenance, the Loviisa power plant was shut down for several days

  18. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Lehtinen, Pekka

    1987-07-01

    These general reviews of the operation of the Finnish nuclear power plants concentrate on such events and discoveries related to reactor and radiation safety that the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tabulated data on the production and load factors of the plants. No event in the report period, or in the whole year of 1986, essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment. For remedying certain defects found in the adminstrative procedures concerning plant operation and maintenance, the Loviisa power plant was shut down for several days in September

  19. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1990-08-01

    During the first quarter of 1990 the Finnish nuclear power plant units Loviisa 1 and 2 and TVO I and II were in commercial operation for most of the time. Nuclear electricity accounted for 32.5% of the total Finnish electricity production during this quarter. The load factor average of the nuclear power plant units was 99.0%. An international nuclear event scale has been introduced for the classification of nuclear power plant events according to their nuclear and radiation safety significance. The scale first undergoes about a year long trial period in several countries. on the scale, events are divided into levels from 1 to 7 of which events at Level 7 are the most serious. Furthermore, Level 0 (Below Scale) is used for events with no safety significance. All events which occurred at the Finnish nuclear power plants this quarter are classified as Level 0. Occupational radiation doses and external releases of radioactivity were considerably below authorised limits. At the Loviisa plant, a back-up emergency feedwater system independent of the plant's other systems has been introduced which offers a new, alternative means of removing residual heat from the reactor. Owing to this system, the risk of a severe accident has been further reduced. At the TVO plants, systems have been introduced by which accident sequences which lead to containment failure could be eliminated and the consequences of a potential severe accident could be mitigated. In this report, also the release of short-lived radioactive materials along the transfer route of an irradiated sample is described which occured at the FiR 1 research reactor. The amounts of radioactive materials individuals received in their bodies in connection with this event were very low

  20. Safety-related incidents at the Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Lehtinen, P.

    1986-03-01

    This report contains detailed descriptions of operating incidents and other safety-related matters at the Finnish nuclear power plants regarded as significant by the regulatory authority, the Finnish Centre for Radiation and Nuclear Safety. In this connection, an account is given of the practical actions caused by the incidents, and their significance to reactor safety is evaluated. The main features of the incidents are also described in the general Quartely Reports, Operation of Finnish Nuclear Power Plants, which are supplemented by this report intended for experts. (author)

  1. Safety-related incidents at the Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Lehtinen, P.

    1985-01-01

    This report contains detailed descriptions of operating incidents and other safety-related matters at the Finnish nuclear power plants regarded as significant by the regulatory authority, the Finnish Centre for Radiation and Nuclear Safety. In this connection, an account is given of the practical actions caused by the incidents, and their significance to reactor safety is evaluated. The main features of the incidents are also described in the general Quartely Reports, Operation of Finnish Nuclear Power Plants, which are supplemented by this report intended for experts. (author)

  2. Safety-related occurrences at the Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Reponen, H.; Viitasaari, O.

    1985-04-01

    This report contains detailed descriptions of operating incidents and other safety-related matters at the Finnish nuclear power plants regarded as significant by the regulatory authority, the Finnish Centre for Radiation and Nuclear Safety. In this connection, an account is given of the practical actions caused by the incidents, and their significance to reactor safety is evaluated. The main features of the incidents are also described in the general Quartely Report for this period, Operation of Finnish Nuclear Power Plants (STUK-B-YTO 7), which is supplemented by this report intended for experts. (author)

  3. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1990-12-01

    During the second quarter of 1990 the Finnish nuclear plant units Loviisa 1 and 2 and TVO and II were in commercial operation for most of the time. The feedwater pipe rupture at Loviisa 1 and the resulting inspections and repairs at both Loviisa plant units brought about an outage the overall duration of which was 32 days. The annual maintenance outages of the TVO plant units were arranged during the report period and their combined duration was 31.5 days. Nuclear electricity accounted for 35.3% of the total Finnish electricity production during this quarter. The load factor average of the nuclear power plant units was 83.0%. Three events occurred during the report period which are classified as Level 1 on the International Nuclear Event Scale: feedwater pipe rupture at Loviisa 1, control rod withdrawal at TVO I in a test during an outage when the hydraulic scram system was rendered inoperable and erroneous fuel bundle transfers during control rod drives maintenance at TVO II. Other events during this quarter are classified as Level Zero (Below Scale) on the International Nuclear Event Scale. Occupational radiation doses and external releases of radioactivity were considerably below authorised limits. Only small amounts of nuclides originating in nuclear power plants were detected in samples taken in the vicinity of nuclear power plants

  4. Safety-related occurrences at the Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Viitasaari, O.; Rantavaara, A.

    1984-03-01

    This report contains detailed descriptions of operating incidents and other safety-related matters at the Finnish nuclear power plants regarded as significant by the regulatory authority, the Finnish Centre for Radiation and Nuclear Safety. In this connection, an account is given of the practical actions caused by the incidents, and their significance to reactor safety is evaluated. The main features of the incidents are also described in the general Quartely Report for this period, Operation of Finnish Nuclear Power Plants (STL-B-RTO-83/7), which is supplemented by this report intended principally for experts. (author)

  5. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1993-12-01

    Quarterly reports on the operation of Finnish nuclear power plants describe events and observations related to nuclear and radiation safety which the Finnish Centre for Radiation and Nuclear Safety considers safety significant. Safety-enhancing plant modifications and general matters relating to the use of nuclear energy are also reported. A summary of the radiation safety of plant personnel and the environment, and tabulated data on the plants' production and their load factors are also given. At the Loviisa 1 plant unit one of two specially-backed AC busbars was lost during the second quarter of 1993. A ca. 30 minute voltage break caused malfunctions in the plant unit's electrical equipment and rendered inoperable certain components important to safety. The event is rated on the International Nuclear Event Scale (INES) at level 1. In inspections carried out at TVO II during the annual maintenance outage, the number of cracks detected in control rod structural material was higher than usual. When cracks occur, part of boron carbide, the power regulating medium in control rods, may wash into the reactor water and control rod shutdown capability may be impaired. The event is rated on the INES at level 1. Other events in the second quarter of 1993 had no bearing on nuclear or radiation safety. (4 figs., 5 tabs.)

  6. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1991-02-01

    During the third quarter of 1990 the Finnish nuclear power plant units Loviisa 1 and 2 and TVO I and II were in commercial operation for most of the time. The annual maintenance outages of the Loviisa plant units were held during the report period. All events during this quarter are classified as Level hero (Below Scale) on the International Nuclear Event Scale. Occupational radiation doses and external releases of radioactivity were below authorised limits. Only small amounts of radioactive substances originating in nuclear power plants were detected in samples taken in the vicinity of nuclear power plants

  7. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1991-12-01

    The Finnish nuclear power plant units Loviisa 1 and 2 as well as TVO 1 and II were in operation for almost the whole second quarter of 1991. The load factor average was 87.4 %. In consequence of a fire, which broke out in the switchgear building, connections to both external grids were lost and TVO II relied on power supplied by four back-up diesels for 7.5 hrs. The event is classified as Level 2 on the International Nuclear Event Scale. The process of examining the non-leaking fuel bundles removed from the Loviisa nuclear reactors has continued. The examinations have revealed, so far, that the uppermost spacing lattices of the bundles exhibit deformations similar to those detected in the leaking fuel bundles removed from the reactors. This event is classified as Level 1 on the International Nuclear Event Scale. Other events in this quarter which are classified according to the International Nuclear Event Scale are Level Zero (Below Scale) on the Scale. The Finnish Centre for Radiation and Nuclear Safety has assessed the safety of the Loviisa and Olkiluoto nuclear power plants based on the new regulations issued on 14.2.1991 by the Council of State. The safety regulations are much more stringent than those in force when the Loviisa and Olkiluoto nuclear power plants were built. The assessment indicated that the TVO nuclear power plant meets these safety regulations. The Loviisa nuclear power plant meets the requirements with the exception of certain requirements related to the ensuring of safety functions and provision for accidents. At the Loviisa nuclear power plant there are several projects under consideration to enhance safety

  8. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1992-09-01

    The Finnish nuclear power plant units Loviisa 1 and 2 as well as TVO I and II were in operation for almost all the time in the first quarter of 1992. The load factor average was 99.8%. All events which are classified on the International Nuclear Event Scale were level 0/below scale on the Scale. Occupational radiation doses and releases of radioactive material off-site remained well below authorised limits. Only quantities of radioactive material insignificant to radiation exposure, originating from the nuclear power plants, were detected in samples collected in the vicinity of the nuclear power plants

  9. Operation of Finnish nuclear power plants. Quarterly report, 2nd quarter 1996

    International Nuclear Information System (INIS)

    Sillanpaeae, T.

    1996-11-01

    Quarterly Reports on the operation of Finnish nuclear power plants describe events and observations relating to nuclear and radiation safety which the Finnish Centre for Radiation and Nuclear Safety (STUK) considers safety significant. Safety improvements at the plants are also described. The report also includes a summary of the radiation safety of plant personnel and of the environment and tabulated data on the plants' production and load factors. In the second quarter of 1996, the Finnish nuclear power plant units were in power operation except for the annual maintenance outages of TVO plant units and the Midsummer shutdown at TVO II which was due to low electricity demand, a turbine generator inspection and repairs. The load factor average of all plant units was 88.9 %. Events in the second quarter of 1996 were classified level 0 on the International Nuclear Event Scale (INES)

  10. Operation of Finnish nuclear power plants. Quarterly report 3rd quarter, 1994

    Energy Technology Data Exchange (ETDEWEB)

    Tossavainen, K. [ed.

    1995-03-01

    Quarterly Reports on the operation of Finnish nuclear power plants describe nuclear and radiation safety related events and observations which the Finnish Centre for Radiation and Nuclear Safety (STUK) considers safety significant. Safety improvements at the plants and general matters relating to the use of nuclear energy are also reported. A summary of the radiation safety of plant personnel and of the environment, and tabulated data on the plants` production and load factors are also given. (4 figs., 4 tabs.).

  11. Operation of Finnish nuclear power plants. Quarterly report 3rd quarter, 1994

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1995-03-01

    Quarterly Reports on the operation of Finnish nuclear power plants describe nuclear and radiation safety related events and observations which the Finnish Centre for Radiation and Nuclear Safety (STUK) considers safety significant. Safety improvements at the plants and general matters relating to the use of nuclear energy are also reported. A summary of the radiation safety of plant personnel and of the environment, and tabulated data on the plants' production and load factors are also given. (4 figs., 4 tabs.)

  12. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1992-05-01

    The Finnish nuclear power plant units Loviisa 1 and 2 as well as TVO I and II were in operation for almost the whole fourth quarter of 1991. The load factor average was 94.7 % (the whole year 90.9 %). All the events in the last annual quarter, which are classified on the International Nuclear Event Scale, were below scale/level 0. Also the events which occurred in the other quarters of the year 1991 were rated at the scale's lowest levels. Occupational radiation doses and releases of radioactive material off-site remained well below authorised limits. Only quantities of radioactive material insignificant to radiation exposure originating in nuclear power plants were detected in the samples collected in the vicinity of the nuclear power plants

  13. Operation of Finnish nuclear power plants. Quarterly report 3rd, quarter 1995

    International Nuclear Information System (INIS)

    Sillanpaeae, T.

    1996-05-01

    Quarterly Reports on the operation of Finnish nuclear power plants describe events and observations relating to nuclear and radiation safety which the Finnish Centre for Radiation and Nuclear Safety (STUK) considers safety significant. Safety improvements at the plants are also described. The Report includes a summary of the radiation safety of plant personnel and of the environment and tabulated data on the plants' production and load factors. Except for the annual maintenance outages of Loviisa plant units and for TVO II's brief outage to repair a failed component, Finnish nuclear power plant units were in power operation in the third quarter of 1995. The load factor average of all plant units was 90.4 %. Events in this quarter were level 0 on the INES scale. Occupational doses and radioactive releases off-site were below authorised limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. (orig.) (4 figs., 4 tabs.)

  14. Operation of Finnish nuclear power plants. Quarterly report 3rd, quarter 1995

    Energy Technology Data Exchange (ETDEWEB)

    Sillanpaeae, T [ed.

    1996-05-01

    Quarterly Reports on the operation of Finnish nuclear power plants describe events and observations relating to nuclear and radiation safety which the Finnish Centre for Radiation and Nuclear Safety (STUK) considers safety significant. Safety improvements at the plants are also described. The Report includes a summary of the radiation safety of plant personnel and of the environment and tabulated data on the plants` production and load factors. Except for the annual maintenance outages of Loviisa plant units and for TVO II`s brief outage to repair a failed component, Finnish nuclear power plant units were in power operation in the third quarter of 1995. The load factor average of all plant units was 90.4 %. Events in this quarter were level 0 on the INES scale. Occupational doses and radioactive releases off-site were below authorised limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. (orig.) (4 figs., 4 tabs.).

  15. Operation of Finnish nuclear power plants. Quarterly report, 3. quarter 1988

    International Nuclear Information System (INIS)

    Koponen, H.

    1989-02-01

    This general review of the operation of the Finnish nuclear power plants concentrates on such events and discoveries related to nuclear and radiation safety as the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tabulated data on the production and load factors of the plants. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environment

  16. Operation of Finnish nuclear power plants. Quarterly report, 2. quarter 1988

    International Nuclear Information System (INIS)

    Koponen, H.

    1988-12-01

    This general review of the operation of the Finnish nuclear power plants concentrates on such events and discoveries related to nuclear and radiation safety as the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tabulated data on the production and load factors of the plants. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel or the environement

  17. Operation of Finnish nuclear power plants. Quarterly report 3. quarter 1987

    International Nuclear Information System (INIS)

    Haenninen, R.

    1988-06-01

    This general review of the operation of the Finnish nuclear power plants concentrates on such events and discoveries related to nuclear and radiation safety as the regulatory body, the Finnish Centre for Radiation and Nuclear Safety, regards as noteworthy. The report also includes a summary of the radiation safety of the personnel and the environment, as well as tabulated data on the production and load factors of the plants. In the report period, no event essentially degraded plant safety nor posed a radiation hazard to the personnel o the environment

  18. Operation of Finnish nuclear power plants. Quarterly report, 4th quarter 1996

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1997-05-01

    Quarterly reports on the operation of Finnish nuclear power plants describe events and observations relating to nuclear and radiation safety which the Finnish Centre for Radiation and Nuclear Safety (STUK) considers safety significant. Safety improvements at the plants are also described. The report also includes a summary of the radiation safety of plant personnel and of the environment and tabulated data on the plants's production and load factors. In the fourth quarter of 1996, the Finnish nuclear power plant units were in power operation except for the annual maintenance outage of Loviisa 2 and a shutdown at Olkiluoto 1 to repair a condensate system stop valve. The load factor average of all plant units was 96.5%. Events in the fourth quarter of 1996 were level 0 on the International Nuclear Event Scale. Occupational doses and radioactive releases off-site were below authorised limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. (orig.)

  19. Operation of Finnish nuclear power plants. Quarterly report, 2nd quarter, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Tossavainen, K. [ed.

    1995-10-01

    Quarterly reports on the operation of Finnish nuclear power plants describe events and observations relating to nuclear and radiation safety which the Finnish Centre for Radiation and Nuclear Safety (STUK) considers safety significant. Fasety improvements at the plants are also described. The report includes a summary of the radiation safety of plant personnel and of the evironment and tabulated data on the plants` production and load factors. Except for the annual maintenance outages of the TVO plant units and for TVO II`s Midsummer outage which was due to low electricity demand, the Finnish nuclear power plants were in power operation during the second quarter of 1995. The load factor average of all four plant units was 91.2 %. Events during the second annual quarter were level 0 on the INES scale. Occupational doses and radioactive releases off-site were below authorized limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. (4 figs., 4 tabs.).

  20. Operation of Finnish nuclear power plants. Quarterly report, 3rd quarter 1996

    International Nuclear Information System (INIS)

    Sillanpaeae, T.

    1997-02-01

    Quarterly Reports on the operation of Finnish nuclear power plants describe events and observations relating to nuclear and radiation safety which the Finnish Centre for Radiation and Nuclear Safety (STUK) considers safety significant. Safety improvements at the plants are also described. The Report also includes a summary of the radiation safety of plant personnel and of the environment and tabulated data on the plants' production and load factors. In the third quarter of 1996, the Finnish nuclear power plant units were in power operation except for the annual maintenance outages of Loviisa plant units and a shutdown at Olkiluoto 1 to identify and repair malfunctions of a high pressure turbine control valve. The load factor average of all plant units was 77.2%. Events in the third quarter of 1996 were classified level 0 on the International Nuclear Event Scale. Occupational doses and radioactive releases off-site were below authorised limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. The names of Teollisuuden Voima Oy's plant units have changed. Olkiluoto 1 and Olkiluoto 2 now replace the names TVO I and TVO II previously used in quarterly reports. (orig.)

  1. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1992-03-01

    The Finnish nuclear power plant units Loviisa 1 and 2 as well as TVO I and II were in operation for almost the whole third quarter of 1991. Longer interruptions in electricity generation were caused by the annual maintenances of the Loviisa plant units. The load factor average was 81.7 %. In a test conducted during the annual maintenance outage of Loviisa 1 it was detected that the check valve of the discharge line of one pressurized emergency make-up tank did not open sufficiently at the tank's hydrostatic pressure. In connection with a 1988 modification, a too tightly dimensioned bearing had been mounted on the valve's axle rod and the valve had not been duly tested after the operation. The event is classified as Level 1 on the International Nuclear Event Scale. Other events in this quarter which are classified according to the International Nuclear Event Scale are Level Zero (Below Scale). Occupational radiation doses and releases of radioactive material off-site were below authorised limits in this quarter. Only small amounts of radioactive materials originating in nuclear power plants were detected in samples taken in the vicinity of nuclear power plants

  2. Ensuring the operational safety of finnish nuclear power plants

    International Nuclear Information System (INIS)

    Vuorinen, A.

    1991-01-01

    The Finnish nuclear energy programme has been successful both from the safety and economical point of view. These achievements are based on different factors which are discussed in the paper. Finnish Centre for Radiation and Nuclear Safety (STUK) has specified the technical requirements and procedures to be followed in the design, construction, commissioning and operation of NPPs in a series of guides. The guides are quite demanding and latest results of safety research and technical development are taken into account. Regulatory supervision of Finnish NPPs is comprehensive. As an example of this the regulatory inspection program for operational phase is presented. An important way to ensure operational safety of a NPP is to define a set of limits and conditions to identify limiting safety envelope for plant operation. Practices in Finland are reviewed in the paper. The strategy of Defence in Depth is amongst the fundamental principles of nuclear safety. Two corollary principles of defence of depth are accident prevention and accident mitigation. Means used in following these principles are discussed. (author)

  3. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1992-12-01

    The Finnish nuclear power plant units Loviisa 1 and 2 as well TVO I and II were in operation for almost the whole second quarter of 1992. Longer breaks in production were caused by the annual maintenance of the TVO plant units. The load factor was 87.4 %. At TVO I it was detected during the annual maintenance outage when removing nuclear fuel assemblies from the reactor that one assembly had been loaded into the reactor in an incorrect manner during the previous year's annual maintenance: the assembly was slightly higher than the other assemblies. The water cooling the nuclear fuel partly by-passed the fuel assembly and the coolant flow proper passing through the assembly was below design. The fuel assembly's cooling had been sufficient during the whole operating cycle but could have essentially deteriorated during certain transients with the danger of consequent damage to some fuel rods. On the International Nuclear Event Scale the event is classified as level 1. Other events in this quarter which are classified on the International Nuclear Event Scale were level 0/below scale on the scale

  4. Finnish research programmes on nuclear power plant safety

    International Nuclear Information System (INIS)

    Puska, E. K.

    2010-01-01

    The current Finnish national research programme on nuclear power plant safety SAFIR2010 for the years 2007-2010 as well as the coming SAFIR2014 programme for the years 2011-2014 are based on the chapter 7a, 'Ensuring expertise', of the Finnish Nuclear Energy Act. The objective of this chapter is realised in the research work and education of experts in the projects of these research programmes. SAFIR2010 research programme is divided in eight research areas that are Organisation and human, Automation and control room, Fuel and reactor physics, Thermal hydraulics, Severe accidents, Structural safety of reactor circuit, Construction safety, and Probabilistic Safety Analysis (PSA). All the research areas include both projects in their own area and interdisciplinary co-operational projects. Research projects of the programme are chosen on the basis of annual call for proposals. In 2010 research is carried out in 33 projects in SAFIR2010. VTT is the responsible research organisation in 26 of these projects and VTT is also the coordination unit of SAFIR2010 and SAFIR2014. In 2007-2009 SAFIR2010 produced 497 Specified research results (Deliverables), 618 Publications, and 33 Academic degrees. SAFIR2010 programme covers approximately half of the reactor safety research volume in Finland currently. In 2010 the programme volume is EUR 7.1 million and 47 person years. The major funding partners are VYR with EUR 2.96 million, VTT with EUR 2.66 million, Fortum with EUR 0.28 million, TVO with EUR 0.19 million, NKS with EUR 0.15 million, EU with only EUR 0.03 million and other partners with EUR 0.85 million. The new decisions-in-principle on Olkiluoto unit 4 for Teollisuuden Voima and new nuclear power plant for Fennovoima ratified by the Finnish Parliament on 1 July 2010 increase the annual funding collected according to the Finnish Nuclear Energy Act from Fennovoima, Fortum and Teollisuuden Voima for the SAFIR2014 programme to EUR 5.2 million from the current level of EUR 3

  5. The classification of knowledge and expertise in Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Kuronen, T.; Rintala, N.

    2006-01-01

    The difficulties in sharing tacit knowledge may compromise the safe performance of high-reliability organisations. This threat has been recognised in nuclear power plants worldwide, owing to the risk of simultaneous retirements. In this study, the nature of tacit knowledge in Finnish nuclear power plants was examined and the expertise of nuclear workers modelled. The results of this interview study showed that the tacit nuclear knowledge can be classified in two dimensions: technical and contextual. According to this classification, the employees in plants can be categorised in four categories: the experts; the novices; the technical specialists; the context sensitives. (author)

  6. Views on safety culture at Swedish and Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Hammar, L.; Wahlstroem, B.; Kettunen, J.

    2000-02-01

    The report presents the results of interviews about safety culture at Swedish and Finnish nuclear power plants. The aim is to promote the safety work and increase the debate about safety in nuclear power plants, by showing that the safety culture is an important safety factor. The interviews point out different threats, which may become real. It is therefor necessary that the safety aspects get support from of the society and the power plant owners. (EHS)

  7. Operation of Finnish nuclear power plants. Quarterly report, 3rd quarter 1997

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1998-04-01

    Quarterly reports on the operation of Finnish nuclear power plants describe events and observations relating to nuclear and radiation safety that the Radiation and Nuclear Safety Authority of Finland (STUK) considers safety significant. Safety improvements at the plants are also described. The Report also includes a summary of the radiation safety of plant personnel and of the environment and tabulated data on the plants' production and load factors. The Finnish nuclear power plant units were in power operation in the third quarter of 1997, except for the annual maintenance outages of Loviisa plant units which lasted well over a month in all. There was also a brief interruption in electricity generation at Olkiluoto 1 for repairs and at Olkiluoto 2 due to a disturbance at the turbine plant. All plant units were in long-term test operation at upgraded reactor power level approved by STUK. The load factor average of all plant units was 87.6 %. One event in the third quarter was classified level 1 on the International Nuclear Event Scale (INES). It was noted at Loviisa 2 that one of four pressurized water tanks in the plant unit's emergency cooling system had been inoperable for a year. Other events in this quarter were INES level 0. Occupational doses and radioactive releases off-site were below authorized limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. (orig.)

  8. Operation of Finnish nuclear power plants. Quarterly report, 2nd quarter 1997

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1997-12-01

    Quarterly Reports on the operation of Finnish nuclear power plants describe events and observations relating to nuclear and radiation safety which STUK - Radiation and Nuclear Safety Authority considers safety significant. Safety improvements at the plants are also described. The Report also includes a summary of the radiation safety of plant personnel and of the environment and tabulated data on the plants' production and load factors. The Finnish nuclear power plant units were in power operation in the second quarter of 1997, except for the annual maintenance outages of Olkiluoto plant units and the Midsummer outage at Olkiluoto 2 due to reduced demand for electricity. There were also brief interruptions in power operation at the Olkiluoto plant units due to three reactor scrams. All plant units are undergoing long-term test operation at upgraded reactor power level which has been approved by STUK The load factor average of all plant units was 88.7 %. One event in the second quarter of 1997 was classified level 1 on the INES. The event in question was a scram at Olkiluoto 1 which was caused by erroneous opening of switches. Other events in this quarter were level 0. Occupational doses and radioactive releases off-site were below authorized limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. (orig.)

  9. Operation of Finnish nuclear power plants. Quarterly report, 1st quarter 1998

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1998-11-01

    Quarterly reports on the operation of Finnish NPPs describe events and observations relating to nuclear and radiation safety that the Radiation and Nuclear Safety Authority (STUK) considers safety significant. Safety improvements at the plants are also described. The report includes a summary of the radiation safety of plant personnel and the environment and tabulated data on the plants' production and load factors. The Finnish NPP units were in power operation for the whole first quarter of 1998. All the units were in long-term test operation at uprated power level authorised by STUK. The load factor average of the plant units was 100.8%. An oil leak at Olkiluoto NPP Unit 2 caused an ignition that was promptly extinguished. A subsequent appraisal of the event disclosed deficiencies in the functioning of the plant unit's operating organization and the event was classified INES level 1. Other events in this quarter had no bearing on nuclear or radiation safety. Occupational doses and radioactive releases off-site were below authorized limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. (orig.)

  10. Operation of Finnish nuclear power plants. Quarterly report, 2nd quarter 1999

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1999-12-01

    Quarterly reports on the operation of Finnish NPPs describe events and observations relating to nuclear and radiation safety that the Finnish Radiation and Nuclear Safety Authority (STUK) considers safety significant. Safety improvements at the plants are also described. The report includes a summary of the radiation safety of plant personnel and the environment and tabulated data on the plants' production and load factors. All Finnish NPP units were in power operation for the whole second quarter of 1999, with the exception of the annual maintenance outages of the Olkiluoto plant units. The load factor average of the plant units in this quarter was 93.1%. Two events in this quarter were classified Level 1 on the INKS Scale. At Olkiluoto 1, a valve of the containment gas treatment system had been in an incorrect position for almost a month, owing to which the system would not have been available as planned in an accident. At Olkiluoto 2, main circulation pump work was done during the annual maintenance outage and a containment personnel air lock was briefly open in violation of the Technical Specifications. Water leaking out of the reactor in an accident could not have been directed to the emergency cooling system because it would have leaked out from the containment via the open personnel air lock. Other events in this quarter had no bearing on the nuclear or radiation safety of the plant units. The individual doses of NPP personnel and also radioactive releases off-site were well below authorised limits. Radioactive substances were measurable in samples collected around the plants in such quantities only as have no bearing on the radiation exposure of the population. (orig.)

  11. Reporting nuclear power plant operation to the Finnish Centre for Radiation and Nuclear Safety

    International Nuclear Information System (INIS)

    1997-01-01

    The Finnish Centre for Radiation and Nuclear safety (STUK) is the authority in Finland responsible for controlling the safety of the use of nuclear energy. The control includes, among other things, inspection of documents, reports and other clarification submitted to the STUK, and also independent safety analyses and inspections at the plant site. The guide presents what reports and notifications of the operation of the nuclear facilities are required and how they shall be submitted to the STUK. The guide does not cover reports to be submitted on nuclear material safeguards addressed in the guide YVL 6.10. Guide YVL 6.11 presents reporting related to the physical protection of nuclear power plants. Monitoring and reporting of occupational exposure at nuclear power plants is presented in the guide YVL 7.10 and reporting on radiological control in the environment of nuclear power plants in the guide YVL 7.8

  12. Studies of potential severe accidents in Finnish nuclear power plants. Quarterly report 3. quarter 1987

    International Nuclear Information System (INIS)

    Aro, Ilari.

    1989-07-01

    This thesis is based on six publications dealing with severe accident studies in Finnish nuclear power plants. Main emphasis has been put on general technical bases and methodologies applied in severe accident evaluation in Finland. As an example of the use of the analysis and evaluation methods, the analysis of one representative accident sequence, t otal loss of AC power , has been presented for both Finnish power plant types. This accident sequence is required to be analyzed in the Finnish safety guide YVL 2.2 which deals with transient and accident analyses as a basis of technical solutions at nuclear powr plants. Two different analysis methods, MAAP 3.0 and MARCH 3/STCP have been used for receiving as complete a picture as possible of the flow of events and for verifying the models to some extent. Besides the use of the two different models, the method of sensitivity analysis has been used for evaluating the effects of some important technical parameters on the accident flow. Finally, conclusions of the applicability of the two methods for analyzing severe accident sequences in Finnish plants have been discussed

  13. A new Finnish nuclear power unit

    International Nuclear Information System (INIS)

    2004-01-01

    In Finland, nuclear power is considered a natural part of a sustainable energy system. The Finnish Parliament has decided that development of nuclear power is consistent with the overall interests of society when climate issues, environmental targets, supply security and stable and competitive prices of electric power are considered as a whole. In 2002, the Finnish Parliament approved the Government's decision in principle to build a fifth nuclear power plant. The new project is the most advanced energy project in the Nordic countries with respect to the availability of energy free of carbon dioxide. The decision is also welcomed by the EU. The new reactor will be of the EPR (European Pressurized Water Reactor) type. In addition to supplying power to the Finnish industries, the plant is considered necessary if Finland is to comply with international conventions on CO 2 emissions

  14. New nuclear power plant unit in Finland accepted by the Finnish Parliament

    International Nuclear Information System (INIS)

    Kaetkae, M.

    2002-01-01

    The nuclear option has been included in Finland's energy strategy since late 1990's. Based on TVO's application the Finnish Parliament accepted in May 2002 the decision in principle to build a new nuclear power plant unit. The main arguments were the growth of electricity demand, reduction of CO 2 emissions, security of energy supply and reasonable as well as predictable electricity price. TVO's intention is to get the new power plant unit into commercial operation at the end of this decade.(author)

  15. SAFIR2014. The Finnish Research Programme on Nuclear Power Plant Safety 2011-2014. Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Simola, K. [ed.

    2013-02-15

    The Finnish Nuclear Power Plant Safety Research Programme 2011-2014, SAFIR2014, is a 4-year publicly funded national technical and scientific research programme on the safety of nuclear power plants. The programme is funded by the State Nuclear Waste Management Fund (VYR), as well as other key organisations operating in the area of nuclear energy. The programme provides the necessary conditions for retaining knowledge needed for ensuring the continuance of safe use of nuclear power, for developing new know-how and for participation in international co-operation. The SAFIR2014 Steering Group, responsible of the strategic alignements of the programme, consists of representatives of the Finnish Nuclear Safety Authority (STUK), Ministry of Employment and the Economy (MEE), Technical Research Centre of Finland (VTT), Teollisuuden Voima Oyj (TVO), Fortum Power and Heat Oy (Fortum), Fennovoima Oy, Lappeenranta University of Technology (LUT), Aalto University (Aalto), Finnish Funding Agency for Technology and Innovation (Tekes), Finnish Institute of Occupational Health (TTL) and the Swedish Radiation Safety Authority (SSM). The research programme is divided into nine areas: Man, organisation and society, Automation and control room, Fuel research and reactor analysis, Thermal hydraulics, Severe accidents, Structural safety of reactor circuits, Construction safety, Probabilistic risk analysis (PRA), and Development of research infrastructure. A reference group is assigned to each of these areas to respond for the strategic planning and to supervise the projects in its respective field. Research projects are selected annually based on a public call for proposals. Most of the projects are planned for the entire duration of the programme, but there can also be shorter one- or two-year projects. The annual volume of the SAFIR2014 programme in 2011-2012 has been 9,5-9,9 M euro. Main funding organisations were the State Nuclear Waste Management Fund (VYR) with over 5 M euro and

  16. SAFIR2014. The Finnish Research Programme on Nuclear Power Plant Safety 2011-2014. Interim Report

    International Nuclear Information System (INIS)

    Simola, K.

    2013-02-01

    The Finnish Nuclear Power Plant Safety Research Programme 2011-2014, SAFIR2014, is a 4-year publicly funded national technical and scientific research programme on the safety of nuclear power plants. The programme is funded by the State Nuclear Waste Management Fund (VYR), as well as other key organisations operating in the area of nuclear energy. The programme provides the necessary conditions for retaining knowledge needed for ensuring the continuance of safe use of nuclear power, for developing new know-how and for participation in international co-operation. The SAFIR2014 Steering Group, responsible of the strategic alignements of the programme, consists of representatives of the Finnish Nuclear Safety Authority (STUK), Ministry of Employment and the Economy (MEE), Technical Research Centre of Finland (VTT), Teollisuuden Voima Oyj (TVO), Fortum Power and Heat Oy (Fortum), Fennovoima Oy, Lappeenranta University of Technology (LUT), Aalto University (Aalto), Finnish Funding Agency for Technology and Innovation (Tekes), Finnish Institute of Occupational Health (TTL) and the Swedish Radiation Safety Authority (SSM). The research programme is divided into nine areas: Man, organisation and society, Automation and control room, Fuel research and reactor analysis, Thermal hydraulics, Severe accidents, Structural safety of reactor circuits, Construction safety, Probabilistic risk analysis (PRA), and Development of research infrastructure. A reference group is assigned to each of these areas to respond for the strategic planning and to supervise the projects in its respective field. Research projects are selected annually based on a public call for proposals. Most of the projects are planned for the entire duration of the programme, but there can also be shorter one- or two-year projects. The annual volume of the SAFIR2014 programme in 2011-2012 has been 9,5-9,9 M euro. Main funding organisations were the State Nuclear Waste Management Fund (VYR) with over 5 M euro and

  17. Reliability of diesel generators in the Finnish and Swedish nuclear power plants

    International Nuclear Information System (INIS)

    Pulkkinen, U.; Huovinen, T.; Norros, L.; Vanhala, J.

    1989-10-01

    Diesel generators are used as emergency AC-power sources in nuclear power plants and they produce electric power for other emergency systems during accidents in which offsite power is lost. The reliability of diesel generators is thus of major concern for overall safety of nuclear power plants. In this study we consider the reliability of diesel generators in the Swedish and Finnish nuclear power plants on the basis of collected operational experience. We classify the occurred failures according to their functional criticality, type and cause. The failures caused by human errors in maintenance and testing are analysed in detail. We analyse also the reliability of the diesel generator subsystems. Further, we study the effect of surveillance test and the type of test on the reliability. Finally we construct an unavailability model for single diesel generator unit and discuss the findings of the study giving some practical recommendations

  18. Finnish experiences on licensing and using of programmable digital systems in nuclear power plants

    International Nuclear Information System (INIS)

    Haapanen, P.; Maskuniitty, M.; Heimburger, H.; Hall, L.E.; Manninen, T.

    1993-01-01

    Finnish utility companies, Imatran Voima Oy (IVO) and Teollisuuden Voima (TVO), and the licensing authority, the Finnish Centre for Radiation and Nuclear Safety (STUK), are preparing for a new nuclear power plant in Finland. Plant vendors are proposing programmable digital automation systems for both the safety-related and the operational I and C (instrumentation and control) systems in this new unit. Also in existing plant units the replacement of certain old analog systems with state-of-the-art digital ones will become necessary in the years to come. Licensing of programmable systems for safety critical applications requires a new approach due to the special properties and failure modes of these systems. The major difficulties seem to be in the assessment and quantification of software reliability. The Technical Research Centre of Finland has in co-operation with the authority and the utilities conducted a project (AJA) to develop domestically applicable licensing requirements, guidelines and practices. International standards, guidelines and licensing practices have been analyzed in order to specify national licensing requirements. The paper describes and discusses the findings and experiences of the AJA project so far. The experience in introducing advanced programmable digital control and computer systems in the operating nuclear power plants will be covered briefly. Although these systems are not safety-related but systems of more general interest regarding nuclear safety, some routines regarding the licensing of safety- related systems have been followed. In these backfitting and replacement projects some experience have been gained in how to license safety-related programmable systems. (Author) 31 refs., 2 figs

  19. Reliability of diesel generators at the Finnish and Swedish nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Pulkkinen, Urho [Technical Research Centre of Finland, Vuorimiehentie 5, SF-02150, Espoo (Finland)

    1986-02-15

    The operating experiences of 40 stand-by diesel generators at the Finnish and Swedish nuclear power plants have been analysed with special emphasis on the impact of the frequency of surveillance testing and of the test procedure on diesel generator reliability, the contribution of design, manufacturing, testing and maintenance errors and the potential and actual common cause failures, The results pf the analyses consisted both practical recommendations and mathematical reliability models and useful reliability data. (author)

  20. Operation of Finnish nuclear power plants. Quarterly report 4th quarter, 1994 and annual summary

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1995-05-01

    The Loviisa NPP units were in power operation the whole last quarter, with the exception of a reactor scram at Loviisa 1. The load factor average of all Finnish plant units was 100.2 %. The annual average was 90.0 %. All events in the fourth annual quarter were assigned level 0 (no safety significance) on the international INES scale. Four events in 1994 were classified level 1 (an anomaly). The Finnish Centre for Radiation and Nuclear Safety in December approved Imatran Voima Oy's application to extend the operation of the reactor pressure vessel of Loviisa 2 until the annual maintenance outage of 2010. During this quarter, a batch of spent fuel from Loviisa power plant was transported to Russia. Occupational doses and radioactive releases off-site were below authorised limits. Only such quantities of plant-based radioactive materials were measurable in samples collected around the plants as have no bearing on the radiation exposure of the population. The report includes a summary of all the items described in the Quarterly Reports of 1994. (8 figs., 4 tabs.)

  1. Operation of Finnish nuclear power plants. Quarterly report 4th quarter, 1994 and annual summary

    Energy Technology Data Exchange (ETDEWEB)

    Tossavainen, K [ed.

    1995-05-01

    The Loviisa NPP units were in power operation the whole last quarter, with the exception of a reactor scram at Loviisa 1. The load factor average of all Finnish plant units was 100.2 %. The annual average was 90.0 %. All events in the fourth annual quarter were assigned level 0 (no safety significance) on the international INES scale. Four events in 1994 were classified level 1 (an anomaly). The Finnish Centre for Radiation and Nuclear Safety in December approved Imatran Voima Oy`s application to extend the operation of the reactor pressure vessel of Loviisa 2 until the annual maintenance outage of 2010. During this quarter, a batch of spent fuel from Loviisa power plant was transported to Russia. Occupational doses and radioactive releases off-site were below authorised limits. Only such quantities of plant-based radioactive materials were measurable in samples collected around the plants as have no bearing on the radiation exposure of the population. The report includes a summary of all the items described in the Quarterly Reports of 1994. (8 figs., 4 tabs.).

  2. Recurring Events in the Finnish Nuclear Power Plants

    International Nuclear Information System (INIS)

    Suksi, Seija; Olander, Ronnie; Tiippana, Petteri

    2003-01-01

    An analysis and evaluation of event investigation methods applied by the Radiation and Nuclear Safety Authority (STUK), and the two Finnish nuclear power plant operators Teollisuuden Voima Oy (TVO) and Fortum Power and Heat Oy (Fortum) was carried out by the Technical Research Centre (VIT) on an assignment from STUK. The study aimed at providing a broad overview of the whole organisational framework to support event investigation practices at the regulatory body and at the utilities. The study was part of the IAEA Co-ordinated Research Programme (CRP) on 'Investigation of Methodologies for Incident Analysis'. The main objective of the research was to evaluate the adequacy and reliability of event investigation analysis methods and practices in the Finnish nuclear power industry and based on the results to further develop them. In general, the direct causes of identified events could be detected and eliminated, but more emphasis should be given to the prevention of recurrence of events and identification of common causes and latent failures. The study showed that the evaluated organisations had rather comprehensive incident analysis arrangements. The study also showed that more focus and prioritisation are needed. Deficiencies were identified mostly in the areas of recording, assessment and classification of new events, use of existing operating experience data, utilisation of information technology tools, and allocation of work and resources. Also the indicators or measures for the effectiveness of event investigation and operating experience feedback were missing. All organisations should maintain adequate resources in this area. The researchers suggested a more effective operating experience feedback loop. Especially more attention should be paid to root cause analysis of significant events, tasks and activities where the initial errors have occurred, and weaknesses of defensive barriers. It was also recommended that implementing periodic operational experience

  3. Monitoring of radioactivity in the environs of Finnish nuclear power stations in 1987

    International Nuclear Information System (INIS)

    Sjoeblom, K.-L.; Klemola, S.; Ilus, E.; Arvela, H.; Blomqvist, L.

    1989-06-01

    Results of the environmental programmes for monitoring radioactive contamination around Finnish nuclear power plants in 1987 are reported. Fallout from the Chernobyl accident, which took place in April 1986, was still dominating the artificial radiation situation in Finland. Thus, large amounts of 137 Cs and other long-lived fallout nuclides predominated in the environmental samples taken in the vicinity of nuclear power plants. The extremely small airborne releases from Finnish nuclear power plants were almost totally covered by fallout nuclides. The somewhat higher aquatic releases were easier to distinguish, and it was possible to follow their spread in the marine environment. The contribution of locally discharged nuclides to radiation doses of the population was insignificant

  4. RATU2. The Finnish research programme on the structural integrity of nuclear power plants. Interim report 1995 - April 1997

    International Nuclear Information System (INIS)

    Solin, J.; Sarkimo, M.; Asikainen, M.

    1997-06-01

    The projects within the Finnish public funded research programme on the structural integrity of nuclear power plants (RATU2) are briefly introduced and the scientific and technical results obtained during the first two years, 1995-April 1997, are summarised in this report. The RATU2 programme was started in 1995 and will be continued until 1998. In 1996 this programme represented 6 % of the nuclear energy R and D in Finland. The research programme is mainly publicly funded and supplies impartial expertise for the regulation of nuclear energy. It also plays an important role in the education of new experts, technology transfer and international exchange of scientific results. The programme is organised into five research projects on the following topics: Material degradation in the reactor environment, Reliability of nondestructive inspections of nuclear power plants, Structural analyses for nuclear power plant components, Maintenance strategies and dependability, and Fire safety. The ageing of the structures and components in the Finnish nuclear power plants is one of the main issues to be considered when safety and economic operation of the plants is evaluated. At the same time, ways are being sought to extend the lifetime of components. The first half of the RATU2 research programme has already brought significant scientific findings and useful applications for ensuring the reliability of NPP components. New technology has been transferred to domestic use through active participation to international co-operation. On the other hand, international acceptance of the results has provided valuable feedback and benchmarking. (orig.)

  5. RATU2. The Finnish research programme on the structural integrity of nuclear power plants. Interim report 1995 - April 1997

    Energy Technology Data Exchange (ETDEWEB)

    Solin, J; Sarkimo, M; Asikainen, M [VTT Manufacturing Technology, Espoo (Finland). Materials and Structural Integrity; eds.

    1997-06-01

    The projects within the Finnish public funded research programme on the structural integrity of nuclear power plants (RATU2) are briefly introduced and the scientific and technical results obtained during the first two years, 1995-April 1997, are summarised in this report. The RATU2 programme was started in 1995 and will be continued until 1998. In 1996 this programme represented 6 % of the nuclear energy R and D in Finland. The research programme is mainly publicly funded and supplies impartial expertise for the regulation of nuclear energy. It also plays an important role in the education of new experts, technology transfer and international exchange of scientific results. The programme is organised into five research projects on the following topics: Material degradation in the reactor environment, Reliability of nondestructive inspections of nuclear power plants, Structural analyses for nuclear power plant components, Maintenance strategies and dependability, and Fire safety. The ageing of the structures and components in the Finnish nuclear power plants is one of the main issues to be considered when safety and economic operation of the plants is evaluated. At the same time, ways are being sought to extend the lifetime of components. The first half of the RATU2 research programme has already brought significant scientific findings and useful applications for ensuring the reliability of NPP components. New technology has been transferred to domestic use through active participation to international co-operation. On the other hand, international acceptance of the results has provided valuable feedback and benchmarking. (orig.). 112 refs.

  6. Monitoring of radionuclides in the vicinities of Finnish nuclear power plants in 1991-1992

    Energy Technology Data Exchange (ETDEWEB)

    Ikaeheimonen, T.K.; Klemola, S.; Ilus, E.; Sjoeblom, K.-L.

    1995-06-01

    Surveillance of radioactive substances around Finnish nuclear power plants continued in 1991-1992 according to regular monitoring programmes, in which about 1000 samples were analysed annually from terrestrial and aquatic environments of the two power plants. Trace amounts of activation products originating from the airborne releases of the local power plants were detected in several air, deposition and soil samples. Discharged nuclides were more abundant in the aquatic environment, especially in samples of indicator organisms, sinking matter and sediments. However, the concentrations were so low that they did not markedly increase the radiation burden in the environment. The dominant artificial radionuclides in the vicinity of the power plants remained the cesium isotopes, {sup 137}Cs and {sup 134}Cs, originating from the Chernobyl accident. (orig.) (21 figs., 40 tabs.).

  7. Monitoring of radionuclides in the vicinities of Finnish nuclear power plants in 1993 and 1994

    International Nuclear Information System (INIS)

    Klemola, S.; Ilus, E.; Ikaeheimonen, T.K.

    1998-08-01

    Monitoring of radioactive substances around Finnish nuclear power plants continued in 1993-1994 in accordance with the regular programmes. Some 1000 samples are analysed annually from the terrestrial and aquatic environments of the two power plant sites. Trace amounts of activation products originating from airborne releases from the local power plants were detected in several air, deposition and soil samples. Discharged nuclides were more abundant in the aquatic environment, especially in samples of indicator organisms, sinking matter and sediments. However, the concentrations were so low that they did not significantly increase the radiation burden in the environment. The dominant artificial radionuclides in the vicinity of the power plants remained the cesium isotopes, especially 137 Cs but also 134 Cs, originating from the Chernobyl accident. (orig.)

  8. Monitoring of radionuclides in the vicinities of Finnish nuclear power plants in 1993 and 1994

    Energy Technology Data Exchange (ETDEWEB)

    Klemola, S.; Ilus, E.; Ikaeheimonen, T.K

    1998-08-01

    Monitoring of radioactive substances around Finnish nuclear power plants continued in 1993-1994 in accordance with the regular programmes. Some 1000 samples are analysed annually from the terrestrial and aquatic environments of the two power plant sites. Trace amounts of activation products originating from airborne releases from the local power plants were detected in several air, deposition and soil samples. Discharged nuclides were more abundant in the aquatic environment, especially in samples of indicator organisms, sinking matter and sediments. However, the concentrations were so low that they did not significantly increase the radiation burden in the environment. The dominant artificial radionuclides in the vicinity of the power plants remained the cesium isotopes, especially {sup 137}Cs but also {sup 134}Cs, originating from the Chernobyl accident. (orig.) 14 refs.

  9. French-Finnish colloquium on safety of French and Russian type nuclear power plants

    International Nuclear Information System (INIS)

    Lukka, M.; Jaervinen, M.; Minkkinen, P.; Ukkola, A.; Levomaeki, L.

    1994-01-01

    The French-Finnish Colloquium on Safety of French and Russian Type Nuclear Power Plants was held in June, 14th - 16th, 1994, in Lappeenranta, Finland. The main topics of the colloquium were: VVER and RBMK reactors; Industrial safety studies for VVER's in FRAMATOME; Structural safety analysis of Ignalina NPP; Thermalhydraulic system (BETHSY) and analytical experiments for French NPP; Test facilities simulating VVER plants during accidents; PACTEL - facility for VVER thermal hydraulics; High burn-up fuel and reactivity accidents; Overview of severe accident research at Nuclear Protection and Safety Institute of CEA; Research of severe accidents in Finland; Review of main activities concerning computer codes used for VVER thermal-hydraulic safety analysis in OKB Gidropress; CATHARE code; APROS computer code, new developments; TRIO and TOLBIAC computer codes; ESTET and N3S softwares; HEXTRAN - 3D reactor dynamics code for VVER accident analysis; An overview the boron dilution issue in PWRs; Boron mixing transients in a 900 MW PWR vessel for a reactor start-up operation; and Problem of boric acid dilution in IVO

  10. RATU2 - The Finnish research programme on the structural integrity of nuclear power plants. Synthesis of achievements 1995-1998

    International Nuclear Information System (INIS)

    Solin, J.; Sarkimo, M.; Asikainen, M.; Aavall, Aa.

    1998-01-01

    The symposium summarises the scientific and technical achievements within the Finnish Research programme on the structural integrity of nuclear power plants (RATU2). The programme began in 1995 and will be accomplished at the end of 1998. The annual volume of this programme represented approximately 6 % of the total nuclear energy R and D in Finland. The research programme was mainly publicly funded and supplied impartial expertise for the regulation of nuclear energy. It also played an important role in the education of new experts, technology transfer and the international exchange of scientific results. (orig.)

  11. Nuclear power plant outages

    International Nuclear Information System (INIS)

    1998-01-01

    The Finnish Radiation and Nuclear Safety Authority (STUK) controls nuclear power plant safety in Finland. In addition to controlling the design, construction and operation of nuclear power plants, STUK also controls refuelling and repair outages at the plants. According to section 9 of the Nuclear Energy Act (990/87), it shall be the licence-holder's obligation to ensure the safety of the use of nuclear energy. Requirements applicable to the licence-holder as regards the assurance of outage safety are presented in this guide. STUK's regulatory control activities pertaining to outages are also described

  12. Monitoring of radionuclides in the environs of Finnish nuclear power plants in 1989-1990

    International Nuclear Information System (INIS)

    Ilus, E.; Sjoeblom, K-L.; Klemola, S.; Arvela, H.

    1992-01-01

    Surveillance of radioactive substances around Finnish nuclear power plants continued in 1989-1990 according to the regular monitoring programmes. About 1000 samples were analysed annually from both terrestrial and aquatic environments. The dominant artificial radionuclides in the vicinity of the power plants were still the cesium isotopes, 137 Cs and 134 Cs, originating from the Chernobyl accident. Owing to radioactive decay, other fallout nuclides with shorter half-lives disappeared from the environmental samples during the period in question. Trace amounts of activation products originating from the airborne releases of the local power plants were detected in some air and deposition samples. Discharged nuclides were more abundant in the aquatic environment, especially in samples of indicator organisms and sinking matter collected from the Olkiluoto area in 1990. However, the concentrations were so low that they did not markedly raise the radiation burden in the environment. (orig.)

  13. Operation of Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Tossavainen, K.

    1994-03-01

    In the third quarter of 1993, all of Finland's four nuclear power plant units were in power operation, with the exception of the annual maintenance outages of the Loviisa units. The load factor average of the plant units was 83.6 %. None of the events which occurred during this annual quarter had any bearing on nuclear or radiation safety. (4 figs., 5 tabs.)

  14. The styles of the Finnish nuclear waste policy

    International Nuclear Information System (INIS)

    Kojo, Matti

    2010-09-01

    The Finnish government determined the aims and schedule for nuclear waste management in 1983. Nearly three decades later spent nuclear fuel (SNF) management is approaching the construction licensing phase of the repository, on schedule. The parliamentary decision on the final disposal of SNF was taken almost unanimously in 2001. The location of the SNF facility was chosen at the same time. The smoothness of this raises questions about the main factors behind the progress in Finland. The aim of the paper is to analyse the Finnish nuclear waste policy from the point of view of policy style. In the paper policy style is defined as 'the interaction between (a) the government's approach to problem-solving and (b) the relationship between government and the other actors in policy process'. According to this definition by Richardson, Gustafsson and Jordan, the focus of style is both on policymaking and on implementation. The policy style approach is used to identify the standard operating procedures of Finnish nuclear waste policy. The paper aims to contribute to the discussion on the formation of national nuclear waste policy and its institutions by analysing the Finnish case

  15. Final disposal of spent nuclear fuel in the Finnish bedrock

    International Nuclear Information System (INIS)

    1992-12-01

    Teollisuuden Voima Oy (TVO) studies Finnish bedrock for the final disposal of the spent nuclear fuel from the Olkiluoto nuclear power plant. The study is in accordance with the decision in principle by Finnish government in 1983. The report is the summary of the preliminary site investigations carried out during the years 1987-1992. On the basis of these investigations a few areas will be selected for detailed site investigation. The characterization comprises five areas selected from the shortlist of potential candidate areas resulted in the earlier study during 1983-1985. Areas are located in different parts of Finland and they represent the main formations of the Finnish bedrock. Romuvaara area in Kuhmo and Veitsivaara area in Hyrynsalmi represent the Archean basement. Kivetty area in Konginkangas consists of mainly younger granitic rocks. Syyry in Sievi is located in transition area of Svecofennidic rocks and granitic rocks. Olkiluoto in Eurajoki represents migmatites in southern Finland. For the field investigations area-specific programs were planned and executed. The field investigations have comprised airborne survey by helicopter, geophysical surveys, geological mappings and samplings, deep and shallow core drillings, geophysical and hydrological borehole measurements and groundwater samplings

  16. Control room modernization at Finnish nuclear power plants - Two projects compared

    International Nuclear Information System (INIS)

    Laarni, J.; Norros, L.

    2006-01-01

    The modernization of automation systems and human-machine interfaces is a current issue at both of the two nuclear power plants (i.e., Fortum's Loviisa plant and TVO's Olkiluoto plant) in Finland. Since the plants have been launched in the 1970's or 1980's, technology is in part old-fashioned and needs to be renewed. At Olkiluoto upgrades of the turbine operator systems have already been conducted; at Loviisa the first phase of the modernization project has just started. Basically, there is a question of the complete digitalization of the information streams at the two plants, and transition from a conventional hard-wired or hybrid control room to a screen-based one. The new human-machine interfaces will comprise new technology, such as PC workstations, soft control, touch screens and large-screen overall displays. The modernization of human-system interfaces is carried out in a stepwise manner at both plants. At both plants the main driver has not been the need to renew the user interfaces of the control room, but the need to upgrade the automation systems. In part because of this, there is a lack of a systematic top-down approach in which different aspects of human factors (HF) engineering are considered in relationship to higher level goals. Our aim here is to give an overview description of the control room modernization projects at the two plants and provide a preliminary evaluation of their progress to date. The projects are also compared, for example, in terms of duration, scope and phasing, and who is responsible for the realization of the project. In addition, we also compare experiences from the Finnish projects to experiences from similar projects abroad. The main part of the data used in this study is based on designers' and project members' interviews. (authors)

  17. Nuclear power plant emergency preparedness

    International Nuclear Information System (INIS)

    2005-01-01

    The guide sets forth detailed requirements on how the licensee of a nuclear power plant shall plan, implement and maintain emergency response arrangements. The guide is also applied to nuclear material and nuclear waste transport in situations referred to in guide YVL 6.5. Requirements on physical protection are presented in a separate guide of Finnish Radiation and Nuclear Safety Authority (STUK)

  18. SAFIR. The Finnish research programme on nuclear power plant safety 2003-2006. Executive summary

    International Nuclear Information System (INIS)

    Puska, E.

    2006-12-01

    Major part of Finnish public research on nuclear power plant safety during the years 2003-2006 has been carried out in the SAFIR programme. The programme has been administrated by the steering group that was nominated by the Ministry of Trade and Industry (KTM). The steering group of SAFIR has consisted of representatives from Radiation and Nuclear Safety Authority (STUK), Ministry of Trade and Industry (KTM), Technical Research Centre of Finland (VTT), Teollisuuden Voima Oy (TVO), Fortum Power and Heat Oy, Fortum Nuclear Services Oy (Fortum), Finnish Funding Agency for Technology and Innovation (Tekes), Helsinki University of Technology (TKK) and Lappeenranta University of Technology (LTY). The key research areas of SAFIR have been (1) reactor fuel and core, (2) reactor circuit and structural safety, (3) containment and process safety functions, that was divided in 2005 into (3a) thermal hydraulics and (3b) severe accidents, (4) automation, control room and IT, (5) organisations and safety management and (6) risk-informed safety management. The research programme has included annually from 20 up to 24 research projects, whose volume has varied from a few person months to several person years. The total volume of the programme during the four year period 2003-2006 has been 19.7 million euros and 148 person years. The research in the programme has been carried out primarily by Technical Research Centre of Finland (VTT). Other research units responsible for the projects include Lappeenranta University of Technology, Fortum Nuclear Services Oy, Helsinki University of Technology and RAMSE Consulting Oy. In addition, there have been a few minor subcontractors in some projects. The programme management structure has consisted of the steering group, a reference group in each of the seven research areas and a number of ad hoc groups in the various research areas. This report gives a short summary of the results of the SAFIR programme for the period January 2003 - November

  19. Communications highlights of the Finnish nuclear industry in 1997

    International Nuclear Information System (INIS)

    Heininen-Ojanperae, Marke

    1998-01-01

    Full text: The Poster will contain two major issues i.e. description of the information Centre Renovation Project at Loviisa Power Plant and a presentation with material of the Sunray III Project. The Sunray Project: The Sunray Project is a national radiation project intended for all ninth graders in the Finnish school system. The project started two years ago. Attention has been focused on the topic of radiation. The topic has been dealt with in connection with different subject as history, English, Swedish, French, Finnish, mathematics, physics, chemistry, geography, health and home economics, as well as vocational counselling. The aim of the project is to provide extensive information on the subject of radiation and radioactivity, to investigate benefits and disadvantages and to help pupils understand units and see things in correct proportions. Sunray I focused on radon, Sunray II on light. Sunray III will start this autumn and its main theme will be risk perception. The programme of the Sunray III is structured as follows: Part One: Articles on risk provided by experts from different fields. Part Two: A risk management game Part Three: A special view on natural radiation. The project is coordinated by Economic Information Bureau in cooperation with the Finnish Centre for Radiation and Nuclear Safety and two major power companies Imatran Voima and Teollisuuden Voima. The coordinator of the Sunray III Project is Mr. Matti Lattu. The Information Centre Renovation Project (ICRP) The ICRP has been a two-year project which was completed for the 20th anniversary celebration of Loviisa Nuclear Power Plant in February 1997. The main emphasis was to harness the local natural environment as much as possible. The focal point of the project was presented by a new, large-sized map as a water-colour painting (a printed version), a bird-eye view of the Haestholinen Island environment. The information signs system was completely renewed. A large sea-water aquarium containing

  20. Fire protection at nuclear power plants

    International Nuclear Information System (INIS)

    1999-11-01

    The guide presents specific requirements for the design and implementation of fire protection arrangements at nuclear power plants and for the documents relating to the fire protection that are to be submitted to STUK (Finnish Radiation and Nuclear Safety Authority). Inspections of the fire protection arrangements to be conducted by STUK during the construction and operation of the power plants are also described in this guide. The guide can also be followed at other nuclear facilities

  1. Monitoring of occupational exposure at nuclear power plants

    International Nuclear Information System (INIS)

    1997-01-01

    The regulations concerning the monitoring of radiation doses of nuclear power plant workers and the reporting of radiation doses to the Finnish Centre for Radiation and Nuclear Safety (STUK) are specified in the guide. (10 refs.)

  2. Quality assurance during operation of nuclear power plants

    International Nuclear Information System (INIS)

    1994-01-01

    The general requirements applicable to the quality assurance of the Finnish nuclear power plants are presented in the Council of State Decision (395/91) and in the guide YVL 1.4. This guide specifies the quality assurance requirements to be applied during the operation of the nuclear power plants as well as of the other nuclear facilities. Quality assurance applies to all the activities and organizations with a bearing on the safe operation of the nuclear power plants. (5 refs.)

  3. Nuclear power plant operator licensing

    International Nuclear Information System (INIS)

    1997-01-01

    The guide applies to the nuclear power plant operator licensing procedure referred to the section 128 of the Finnish Nuclear Energy Degree. The licensing procedure applies to shift supervisors and those operators of the shift teams of nuclear power plant units who manipulate the controls of nuclear power plants systems in the main control room. The qualification requirements presented in the guide also apply to nuclear safety engineers who work in the main control room and provide support to the shift supervisors, operation engineers who are the immediate superiors of shift supervisors, heads of the operational planning units and simulator instructors. The operator licensing procedure for other nuclear facilities are decided case by case. The requirements for the basic education, work experience and the initial, refresher and complementary training of nuclear power plant operating personnel are presented in the YVL guide 1.7. (2 refs.)

  4. Modernisation for maintaining and improving safety at Nordic nuclear power plants

    International Nuclear Information System (INIS)

    Hammer, L.; Wahlstroem, B.; Simola, K.

    1998-02-01

    The safety practices in Finland and Sweden are described and compared in regard of effecting modernisation for safety of the nuclear plants in the two countries, considering new technology and advancing safety requirements as proposed for new reactors. Particular attention is given to strategies for applying new safety requirements to reactors built to earlier standards, and to the interplay between the nuclear utilities and the safety authorities. Overviews are given of past and current modernisation of the nuclear power plants in Finland and Sweden. The management procedures in controlling the implementation of modifications to the nuclear power plants are described and discussed in regard of prevailing differences between Finnish and Swedish practices. A formal modelling technique (SADT) was applied for capture of the essential contents of the relevant documented procedures. Two examples of recent plant modifications in the Finnish nuclear plants in Olkiluoto and Loviisa are described and discussed in greater detail. Recommendations are given. (au)

  5. The history of Finnish nuclear non-proliferation policy during the cold war. What did the Finns know about nuclear weapons

    International Nuclear Information System (INIS)

    Ahosniemi, A.

    2004-03-01

    This article is a summary of the Finnish historical survey during the Cold War. In the article, I try to show how the Finnish Nuclear Non-Proliferation Policy during the Cold War is linked to the broader context of the Finnish foreign and security policy. In the research report I have focused on several questions. One of the most important is the following: What did the Finns know about nuclear weapons during the Cold War? And in this context scientific knowledge is meant by knowing something about nuclear weapons. Basically, the Finnish national based survey of nuclear non-proliferation policy attempted to investigate issues like the kind of research concerning Nuclear Technology in general, Nuclear weapons, and Nuclear weapon policies of super powers in Finland during the Cold War era. (author)

  6. Ventilation systems and components of nuclear power plants

    International Nuclear Information System (INIS)

    1997-01-01

    The most important radiation and nuclear safety requirements for the design and manufacture of nuclear power plant ventilation systems and components are presented in the guide. Also the regulatory activities of the Finnish Centre for Radiation and Nuclear Safety (STUK) as regards the ventilation systems and components are explained. Documents and data which shall be submitted to STUK during the various phases of the regulatory procedure relating to the design, construction, commissioning and operation of the nuclear power plants are presented. (13 refs.)

  7. Nuclear power plant control and instrumentation activities in Finland

    International Nuclear Information System (INIS)

    Haapanen, P.; Wahlstroem, B.

    1992-01-01

    Finland has remarkable achievements in nuclear power. The existing four plants have some of the best operating records in the world - high capacity factors, low occupational doses and short refuelling outages. Public opinion was strongly turned against nuclear power after Chernobyl accident, and the previous government decided not to allow for the construction of a fifth nuclear unit during its period of reign. The opposition has however slowly been diminishing. According to the latest polls the opinion is almost balanced. Finnish power companies are going to file an application for a decision-in-principle to build a new plant to the new government appointed in April 1991. A readiness to start new construction project immediately after a positive political decision is made has been maintained during the intermediate period. Continuous research, development, modification and upgrading work provide important components of the good operational history of the Finnish nuclear power plants. Efforts have also been devoted to identifying possible new problems arising from the use of distributed digital C and I technology. The following a short description is summarizing recent activities related to the C and I-systems of the nuclear power plants. (author). 3 tab

  8. Monitoring of radionuclides in the vicinities of Finnish nuclear power plants in 1999-2001

    International Nuclear Information System (INIS)

    Ikaeheimonen, T.K.; Klemola, S.; Illus, E.; Vartti, V.P.; Mattila, J.

    2006-09-01

    Monitoring of the radioactive substances around Finnish nuclear power plants continued in 1999-2001 in accordance with the regular environmental monitoring programmes. Altogether some 1000 samples are analysed annually from the terrestrial and aquatic environs of the two power plants. Trace amounts of activation products originating from airborne releases from the local power plants were detected in several air and deposition samples. At Loviisa, observations were made in five aerosol samples; at Olkiluoto in three samples during the reporting period. The concentrations were very low, being a few microbequerels per cubic metre. A similar pattern was tenable for the deposition samples, too. No traces of local discharge nuclides were detected in foodstuffs, drinking water or garden products. In mushrooms and wild berries picked from the Loviisa and Olkiluoto areas, only Chernobyl-derived cesium isotopes and natural 40 K were found. Local discharge nuclides were more abundant in the aquatic environment, especially in samples of indicator organisms, sinking matter and sediments. The dominant artificial radionuclides in the vicinity of the power plants were still the caesium isotopes, especially 137 Cs, originating from the Chernobyl accident. In seawater, elevated 3 H concentrations were more frequent at Loviisa, but no traces of other discharge nuclides were detected. In indicator organisms and sinking matter the concentrations of local discharge nuclides were somewhat higher and their distribution range was wider in the sea area off Olkiluoto. Small amounts of 60 Co originating from the local power plant were detected in sediments at a distance of about 15 km from the Olkiluoto NPP. (orig.)

  9. Defects in pipe supports attached to concrete structures at Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Nykaenen, J.E.; Reponen, H.; Suominen, J.

    1981-01-01

    The Installation defects in expansion anchors of pipe supports detected in Sweden attracted the attention of the Finnish nuclear authority, the IRP in the autumm of 1979. No serious deficiencies were found at TVO I and II units where expansion anchors tightened by torguing are used. Preliminary inspections at Lo 2 construction plant revealed a great number of defectively installed expansion anchors of the type which is tightened by hitting. This resulted in placing Lo 1 unit into a cold shut-down condition for inspections and reparation. The shut-down lasted for three weeks during which time, in rooms inaccessible during operation, about 2000 expansion anchors were checked and 95% of them repaired or modified. After running up Lo 1 unit, the work continued in accessible rooms and at Lo2 unit for several months. The main fault was the failure to hit the anchor wedge deep enough into its cylinder. A contributing factor may have been too small hole diameters. The anchor tensile tests conducted at the site proved that the insufficient penetration of the wedge drastically reduces the load capacity. (orig./GL)

  10. Beliefs concerning the reliability of nuclear power plant in-service inspections

    International Nuclear Information System (INIS)

    Kettunen, J.

    1997-01-01

    The aim of the study was to investigate belief systems held by the officials responsible for the planning and supervision of NDT operations within the Finnish nuclear industry. They were asked to express their opinions on (1) the reliability of NDT methods in general, (2) the factors influencing the reliability of in-service inspections, and (3) the degree of reliability of the current inspections operations conducted by means of NDT methods in the Finnish nuclear power plants. Another goal of the study was to assess the adequacy of officials' beliefs (or belief systems). The research data was collected by interviewing representatives from Finnish power companies (Imatran Voima Oy and Teollisuuden Voima Oy), independent inspection organisations, and the Finnish Centre for Radiation and Nuclear Safety (STUK). The adequacy of the beliefs expressed was assessed by means of the results obtained from international NDT reliability studies and on the basis of interviewees' own justification. (refs.)

  11. Finnish solution to increased basic professional training needs in nuclear safety

    International Nuclear Information System (INIS)

    Kyrki-Ramaeki, R.; Koskinen, K.

    2008-01-01

    The Finnish nuclear energy organizations have in cooperation arranged basic professional training courses on nuclear safety due to fast increased education needs. Especially the new nuclear power plant construction project turned the situation acute, but there was also a need to preserve the tacit knowledge of many nuclear experts retiring within the next ten years. From 2003, the YK courses have been arranged five times with altogether 270 participants. The need of this kind of complementary education is still seen high in Finland, and the YK6 course is to be arranged during the next winter. There has not been seen to be legal incompetence due to the likelihood of bias in the education even that the participating organizations have differing and/or opposing roles. It is seen that a real safety culture presumes that nuclear safety is a common goal, and even the competition for market shares is no obstacle for cooperation. (authors)

  12. Monitoring of radionuclides in the vicinities of Finnish nuclear power plants in 1995 and 1996

    International Nuclear Information System (INIS)

    Ilus, E.; Ikaeheimonen, T.K.; Klemola, S.

    2002-12-01

    Monitoring radioactive substances around Finnish nuclear power plants continued in 1995 and 1996 in accordance with regular environmental monitoring programmes. Altogether, some 1000 samples are analysed annually from the terrestrial and aquatic environments of the two power plants. Trace amounts of activation products originating from airborne releases from the local power plants were detected in several air and deposition samples. At Loviisa, observations were made in twenty aerosol samples; at Olkiluoto they were made once during the reporting period. The concentrations were very low, from a few microbecquerels to a few tens of microbecquerels per cubic metre. A similar pattern was also tenable for the deposition samples. No traces of local discharge nuclides were detected in foodstuffs, drinking water, or garden products. In mushrooms and wild berries picked from the Loviisa area,only Chernobyl derived cesium isotopes and natural 40 K were found. Local discharge nuclides were more abundant in the aquatic environment, especially in samples of indicator organisms, sinking matter, and sediments. The dominant artificial radionuclides in the vicinity of the power plants were still the cesium isotopes, especially 137 Cs but also 134 Cs, originating from the Chernobyl accident. In seawater, elevated 3H concentrations were more frequent in Loviisa, but no traces of other discharge nuclides were detected. At Olkiluoto, small amounts of activation products were detected in seawater samples taken during the maintenance outages at the power plant. The concentrations of local discharge nuclides in indicator organisms and sinking matter were somewhat higher and their distribution range was wider in the sea area of Olkiluoto. However, the concentrations were so low that they did not increase the radiation burden in the environment. Small amounts of 60 Co originating from the local power plant were detected in sediments at adistance of about 15 km from Olkiluoto. (orig.)

  13. Evaluation of the Finnish nuclear waste management programme

    International Nuclear Information System (INIS)

    1994-05-01

    In response to a request from Finland in November 1992, the International Atomic Energy Agency (IAEA) set up a Team of four experts (representatives from Belgium, Canada, Germany and Switzerland) to review the Finnish nuclear waste management programme within the auspices of IAEA's Waste Management programme (WATRP). During the early summer of 1993, the Team reviewed a large amount of documentation supplied by the Finnish industry, government and research organizations. The radioactive waste management programme areas within the Team's terms of reference included: (1) work being done in siting and building a conditional facility for spent nuclear fuel and siting and constructing a co-located repository, (2) the plans and activities for conditioning and disposing of the low and intermediate level waste from Finland's NPPs and (3) the plans for decommissioning Finland's reactors when that becomes necessary. The evaluation work and the recommendations of the Team are detailed in the report

  14. Nuclear Power Plant Control and Instrumentation activities in Finland

    International Nuclear Information System (INIS)

    Haapanen, P.; Wahlstroem, B.

    1990-01-01

    Finland has achieved some remarkable achievements in nuclear power production. Existing four plants have some of the best operating records in the world - high capacity factors, low occupational doses and short refuelling outages. Although public opinion was strongly turned against nuclear power after Chernobyl accident, and no decisions for new nuclear plants can be made before next elections in 1991, the nuclear option is still open. Utility companies are maintaining readiness to start new construction immediately after a positive political decision is made. One important component of the good operation history of the Finnish nuclear power plants is connected to the continuous research, development, modification and upgrading work, which is proceeding in Finland. In the following a short description is given on recent activities related to the I and C-systems of the nuclear power plants. (author). 2 tabs

  15. Monitoring of Radio-nuclides in the Vicinities of Finnish Nuclear Power Plants in 2002-2004

    International Nuclear Information System (INIS)

    Ilus, E.; Klemola, S.; Vartti, V.-P.; Mattila, J.; Ikaeheimonen, T.K.

    2000-03-01

    The monitoring of radioactive substances round Finnish nuclear power plants continued in 2002-2004 in accordance with the regular environmental monitoring programmes. Altogether, some 1000 samples are analysed annually from the terrestrial and aquatic environs of the two power plants. Trace amounts of activation products originating from airborne releases from the local power plants were detected in several air and deposition samples taken from the close vicinities of the power plants. At Loviisa, observations were made in two; at Olkiluoto in three aerosol samples during the reporting period. Except for the naturally occurring beryllium-7, the concentrations of all radionuclides in the air samples were very low; from few microbequerels to few tens of microbequerels per cubic metre. A similar pattern was tenable for the deposition samples as well. The activity concentrations of cobalt-60 of local origin were at their highest 0.3 bequerels per square metre in one sample taken from Loviisa and in one sample taken from Olkiluoto. No traces of local discharge nuclides were detected in foodstuffs, drinking water or garden products. In mushrooms and wild berries picked up in 2004 from the Loviisa area, only Chernobyl-derived caesium isotopes and natural potassium-40 were detected. Local discharge nuclides were more abundant in the aquatic environment, especially in samples of indicator organisms, sinking matter and sediments, which effectively accumulate radioactive substances. Besides tritium originating from local discharges, the most significant artificial radionuclide in the samples taken from the aquatic environs of the power plants was still caesium-137 originating from the Chernobyl accident (potassium-40 is a naturally occurring radionuclide). Elevated tritium concentrations were more frequent in the water samples from Loviisa. In indicator organisms and sinking matter, the observed concentrations of local discharge nuclides were generally somewhat higher and

  16. Preserving and sharing tacit knowledge in a nuclear power plant

    International Nuclear Information System (INIS)

    Kuronen, T.; Saeaemaenen, K.; Jaervenpaeae, E.; Rintala, N.

    2007-01-01

    Tacit knowledge of nuclear experts is essential for reliable and competent performance of nuclear power plants. This report discusses preserving and sharing tacit knowledge in nuclear power plant context. Tacit knowledge as well as its structure and content in this complex and safety-critical context are described, and the role of tacit knowledge in expertise is discussed. In order to contribute to tacit knowledge preserving the challenges in and prerequisites for tacit knowledge sharing are identified. In addition, based on empirical case studies and literature, good practices and methods for tacit knowledge sharing are described. The report is based on the results of DIAMOND research project conducted in 2004-2006 in Finnish nuclear power plants, tacit knowledge, nuclear power plant, tacit knowledge sharing methods, expertise. (author abstract)

  17. Monitoring of radionuclides in the environs of the Finnish nuclear power stations in 1988

    International Nuclear Information System (INIS)

    Klemola, S.; Ilus, E.; Sjoeblom, K.L.; Arvela, H.; Blomqvist, L.

    1991-03-01

    Monitoring of radionuclides around Finnish nuclear power plants continued in 1988 with the regular programmes. About 1000 samples were analysed from both terrestrial and aquatic environments.The dominant artificial radioactive substances in the vicinity of power plants were still the fallout nuclides from the Chernobyl accident, but the concentrations in all the objects monitored are lower than in the previous year. Trace amounts of activation products originating from the airborne releases of local power plants were detected in some air and deposition samples. Discharged nuclides were more abundant in the aquatic environment, especially in samples of indicator organisms. However, their contribution to the radiation doses received by the the public was very small. (orig.)

  18. Operational Experience of Nuclear Fuel in Finnish Nuclear Power Plants (with Emphasis on WWER Fuel)

    International Nuclear Information System (INIS)

    Teraesvirta, R.

    2009-01-01

    The four operating nuclear reactors in Finland, Loviisa-1 and -2 and Olkiluoto-1 and -2 have now operated approximately 30 years. The overall operational experience has been excellent. Load factors of all units have been for years among the highest in the world. The development of the fuel designs during the years has enabled remarkable improvement in the fuel performance in terms of burnup. Average discharge burnup has increased more than 30 percent in all Finnish reactor units. A systematic inspection of spent fuel assemblies, and especially all failed fuel assemblies, is a good and useful practise employed in Finland. A possibility to inspect the fuel on site using a pool side inspection facility is a relatively economic way to find out root causes of fuel failures and thereby facilitate developing remedies to prevent similar failures in the future

  19. Explaining the ratification of nuclear waste disposal by the finnish parliament: political culture and contextual factors

    International Nuclear Information System (INIS)

    Ruostetsaari, I.

    2002-01-01

    According to the Nuclear Energy Act the government's Decision in Principle (DiP) on the nuclear waste disposal needs to be ratified by Parliament. The DiP was ratified by general consent (159-3) on 18 May 2001. How we can explain this parliamentary consensus taking account that the previous DiP concerning construction of a new nuclear power plant was overruled in 1993 and the public debate on nuclear power is still pronounced. The explanation can be sought, together with the institutional arrangements, from two sources; on one hand from the Finnish political culture, i.e., traditional and inherited ways of decision-makers to make decisions and citizens' ways to react to those decisions, and on the other hand, from current contextual factors linking to nuclear waste management. (authors)

  20. National nuclear power plant safety research 2011-2014. SAFIR2014 framework plan

    International Nuclear Information System (INIS)

    2010-01-01

    A country utilising nuclear energy is presumed to possess a sufficient infrastructure to cover the education and research in this field, besides the operating organisations of the plants and a regulatory body. The starting point of public nuclear safety research programmes is that they provide the necessary conditions for retaining the knowledge needed for ensuring the continuance of safe and economic use of nuclear power, for development of new know-how and for participation in international cooperation. In fact, the Finnish organisations engaged in research in this sector have been an important resource which the various ministries, the Radiation and Nuclear Safety Authority (STUK) and the power companies have had at their disposal. Ministry of employment and the economy appointed a group to write the Framework Plan of the new programme. This report contains a proposal for the general outline of the programme, entitled as SAFIR2014 (SAfety of Nuclear Power Plants - Finnish National Research Programme). The plan has been made for the period 2011-2014, but it is based on safety challenges identified for a longer time span as well. Olkiluoto 3, the new nuclear power plant unit under construction and new decisions-in-principle have also been taken into account in the plan. The safety challenges set by the existing plants and the new projects, as well as the ensuing research needs do, however, converge to a great extent. The research programme is strongly based on the Chapter 7a of the Finnish Nuclear Energy Act. The construction of new power plant units will increase the need for experts in the field in Finland. At the same time, the retirement of the existing experts is continuing. These factors together will call for more education and training, in which active research activities play a key role. This situation also makes long-term safety research face a great challenge. The Framework Plan aims to define the important research needs related to the safety

  1. Beliefs concerning the reliability of nuclear power plant in-service inspections; Uskomuksia ydinvoimalaitoksissa suoritettavien tarkastusten luotettavuudesta

    Energy Technology Data Exchange (ETDEWEB)

    Kettunen, J. [VTT Automation, Espoo (Finland)

    1997-01-01

    The aim of the study was to investigate belief systems held by the officials responsible for the planning and supervision of NDT operations within the Finnish nuclear industry. They were asked to express their opinions on (1) the reliability of NDT methods in general, (2) the factors influencing the reliability of in-service inspections, and (3) the degree of reliability of the current inspections operations conducted by means of NDT methods in the Finnish nuclear power plants. Another goal of the study was to assess the adequacy of officials` beliefs (or belief systems). The research data was collected by interviewing representatives from Finnish power companies (Imatran Voima Oy and Teollisuuden Voima Oy), independent inspection organisations, and the Finnish Centre for Radiation and Nuclear Safety (STUK). The adequacy of the beliefs expressed was assessed by means of the results obtained from international NDT reliability studies and on the basis of interviewees` own justification. (refs.).

  2. Finnish Nuclear Power Development - Experiences and Lessons Learned

    International Nuclear Information System (INIS)

    Kara, M.; Mattila, L.

    1996-01-01

    A small nation planning to make use of nuclear energy technology faces an important question: Is a nuclear energy programme just buying a rector and fuel from abroad? The Finnish experience says no. Making the best economic and technical choices depends on circumstances and good decisions can be based only on adequate research. Carrying out a successful nuclear energy programme demands high quality standards and, most importantly, nuclear safety is a national responsibility. Through training of personal and a deep understanding of the technology are necessary to meet these challenges. In Finland, comprehensive coverage of important scientific and technical aspects has been achieved economically by pooling the resources of all domestic parties having relevant expertise and by extensive international collaboration. (author)

  3. New nuclear power plants and the electricity market competition

    International Nuclear Information System (INIS)

    Ruska, M.; Koreneff, G.

    2009-11-01

    The study assesses the effects the different nuclear power plant projects would have on crossownership, market concentration and market power in electricity market. The analyses are given both for Finnish and Nordic power markets. The authors feel that the electricity market should primarily be viewed as a common Nordic market in the future. During 2000 to 2008 the hours when Finland was an own price area ranged from 1 % to 29 % as annual averages. In the future it will be more and more seldom that Finland will become an own deficit price area, because the cross-border transmission capacity to Sweden will increase as will Finnish electricity production capacity. In addition, the extension of Nord Pool to the Baltic will increase the size of the market. The ownership of power plants is typically organized through power share companies in Finland. Two of the three nuclear power plant projects are joint ventures with several electricity producers and consumers. The current ownership relations and what effects the new projects might have on them were analyzed in this study. The competitiveness of different electricity production forms in the future was assessed using different market scenarios based on varying demand expectations. The capacity structure was assumed to stay quite unchanged, where the biggest change is expected to come from new renewable power capacity due to EU targets. Conventional condensing power production will decrease and Nordic electricity exports will increase in the future. The market concentration would increase in Finland with new nuclear plants, the most if Fortum were the builder. Vattenfall has a decidedly larger electricity production in the Nordic countries than Fortum, and Vattenfall's capacity would be unchanged by the new planned nuclear plants. The nuclear power plant projects do not therefore increase market concentration significantly on a Nordic level. Nuclear power is not used for day or hour regulation in Finland, which means

  4. Assessment of control rooms of nuclear power plants

    International Nuclear Information System (INIS)

    Norros, L.; Ranta, J.; Wahlstroem, B.

    1983-05-01

    To identify and correct the lacks in control rooms of operating power plants and plants under construction an extensive program has been started in the USA. In Finland as in other countries using nuclear power, the development in the USA particularly with regard to the requirements imposed on nuclear power plants is carefully followed. The changes in these requirements are sooner or later also reflected in the guidelines given by the Finnish authorities. It is therefore important to be able to form a notion of how the new requirements apply to Finnish conditions. Especially it is important to review the latest assessment guidelines for control room implementation (NUREG-0700). Thus we can avoid possible over hasty conclusions. The aim of the analysis of the method and experiments presented in NUREG 0700 report was to create a basis for assessment of the suitability of the method for Finnish control room implementation. The task group has made a general methodical analysis of the method, and partly tried it in assessment of the TVO2 control room. It is obvious that direct conclusions from the American situation are misleading. It can be considered unfeasible to follow the American requirements as such, because they can lead to unwanted results. If the review is limited to control room details, the NRC program (checklist) can be considered successful. It can also be used during planning to observation of small discrepancies. However, we can question the applicability of some requirements. It is, though, more essential that the control room entity has neither in this nor in several other programs been reached or standardized. In spite of the difficulties we should try to reach this most important goal. (author)

  5. Evaluation of incident analysis practices in the Finnish nuclear power industry

    Energy Technology Data Exchange (ETDEWEB)

    Kettunen, J.; Laakso, K

    1999-12-01

    This report provides an analysis and evaluation of incident analysis methods and practices applied by the Finnish regulator Radiation and Nuclear Safety Authority (STUK) and the two Finnish nuclear power plant operators Teollisuuden Voima Oy (TVO) and Fortum Power and Heat Oy (Fortum). The study was conducted in 1998-99. The research material was based on tape-recorded interviews as well as internal directions and event investigation reports provided by the three participating organisations. A framework for analysis and evaluation was developed as part of the study on the basis of referenced root cause analysis and operating experience review methods, selected (foreign) inspection reports, scientific papers and research literature. Well-known inspection methods and principles, such as ASSET and MTO/HPES, provided important guidance to this work. This study shows that although all the evaluated organisations had rather comprehensive incident analysis arrangements, more focus and priorisation is needed. Deficiencies were identified mostly in the areas of recording, assessment and classification of new events and observations, use of existing operating experience data, utilisation of information technology based tools, and allocation of work and resources. In general the direct causes of identified events can be detected and removed, but more emphasis should be given to the prevention of recurrence. This requires a more efficient feedback loop that can be created and maintained by focusing on the root causes of significant events, tasks and activities in which the originating errors occurred, and weaknesses of defensive barriers, and by implementing periodic operational experience reviews. A strategy document for the operating experience feedback process, and firm procedures for the initial assessment of new events and the carrying out of data analyses would help. (orig.)

  6. Finnish Research Programme on Nuclear Waste Management (KYT). Framework Programme for 2002-2005

    International Nuclear Information System (INIS)

    Rasilainen, K.

    2002-12-01

    The new Finnish research programme on nuclear waste management (KYT) will be conducted in 2002 - 2005. This framework programme describes the starting point, the basic aims and the organisation of the research programme. The starting point of the KYT programme is derived from the present state and future challenges of Finnish nuclear waste management. The research programme is funded mainly by the Ministry of Trade and Industry (KTM), the Radiation and Nuclear Safety Authority (STUK), Posiva Oy, Fortum Oyj, Teollisuuden Voima Oy (TVO), and the National Technology Agency (Tekes). As both regulators and implementors are involved, the research programme concentrates on neutral research topics that must be studied in any case. Methods and tools for experimental and theoretical studies fall in this category. State of the art -reviews on relevant topics also create national know-how. Topics that directly belong to licensing activities of nuclear waste management are excluded from the research programme. KYT carries out technical studies that increase national know-how in the area of nuclear waste management. The aim is to maintain and develop basic expertise needed in the operations derived from the national nuclear waste management plan. The studies have been divided into strategic studies and studies enhancing the long-term safety of spent nuclear fuel disposal. Strategic studies support the overall feasibility of Finnish nuclear waste management. These studies include basic options and overall safety principles related to nuclear fuel cycle and nuclear waste management. In addition, general cost estimates as well as general safety considerations related to transportations, low- and medium level wastes, and decommissioning are included in strategic studies. Studies supporting the long-term safety of spent fuel disposal include issues related to performance assessment methodology, release of radionuclides from the repository, behaviour of bedrock and groundwater

  7. Monitoring of radioactivity in the environs of Finnish nuclear power stations in 1986

    International Nuclear Information System (INIS)

    Ilus, E.; Sjoeblom, K.L.; Aaltonen, H.; Klemola, S.; Arvela, H.

    1987-06-01

    Results of the environmental programmes monitoring radioactivity around the Finnish nuclear power stations in 1986 are reported. After the end of April the fallout nuclides from the Chernobyl accident predominated in all samples taken from the environs of the two power stations Loviisa and Olkiluoto. Radionuclides originating from the Finnish power stations were detected mainly in samples taken from the aquatic environment. The concentrations of the locally discharged nuclides were very low in comparison with the fallout nuclides and their impact on the radiation doses of the population was insignificant. Both nuclear power stations are situated in the main fallout area in Finland. The results of these large monitoring programmes give a good picture of the behaviour of the Chernobyl fallout in the specific areas in Finland

  8. Digital control in Finnish power industry applications and some research and development activities

    International Nuclear Information System (INIS)

    Haapanen, P.; Winter, M.

    1986-01-01

    First applications of digital control systems in Finnish power plants stem from a few years time. There are at present in operation two conventional peat fuelled district heating power plants and two others are under construction. In existing nuclear power plants digital control systems are not used. Feasibility studies of a new fifth nuclear power plant have been carried out and also preliminary design exercises on its control systems has been done. It seems that the use of a digital control system in this plant is an alternative worthy of consideration. The existing digital control applications and future plans for their use in the Finnish power industry are described. The rest of the paper is devoted to the reliability questions. Software reliability is a new problem area emanating from the use of programmable digital systems. A description of a cooperative project on these questions between VTT and OECD Halden Project is given. VTT has also developed an interactive computer program, RELVEC, for plant and control system reliability analysis. The structure and use of this system is described

  9. Developing a computerized aging management system for concrete structures in finnish nuclear power plants

    International Nuclear Information System (INIS)

    Al-Neshawy, F.; Piironen, J.; Sistonen, E.; Vesikari, E.; Tuomisto, M.; Hradil, P.; Ferreira, M.

    2013-01-01

    Finland has four nuclear reactors units in two power plants. The first unit started operation in 1977 and in the early 1980's all four units were in use. During the last few years the aging management of the Nuclear Power Plant's (NPP) concrete structures has grown an important issue because the existing structures are reaching the end of their licensed operating lifetime (about 40 years). Therefore the nuclear power companies are developing aging management systems to avoid premature degradation of NPP facilities and to be able to extend their operating lifetime. This paper is about the development of a computerized ageing management system for the nuclear power plants concrete structures. The computerized ageing management system is built upon central database and implementation applications. It will assist the personnel of power companies to implement the aging management activities at different phases of the lifetime of a power plant. It will provide systematic methods for planning, surveillance, inspection, monitoring, condition assessment, maintenance and repair of structures. (authors)

  10. Ordinance on the Finnish Centre of Radiation and Nuclear Safety

    International Nuclear Information System (INIS)

    1990-01-01

    This Ordinance was adopted in implementation of the 1983 Act setting up the Finnish Centre for Radiation and Nuclear Safety and the 1987 Nuclear Energy Act and entered into force on 1 November 1990. The Ordinance specifies the tasks of the Centre, as provided under both Acts, and gives it several supplementary responsibilities. In addition to its overall competence in respect of radiation safety, the Centre will carry out research into and supervise the health effects of radiation and maintain a laboratory for national measurements in that field. The Ordinance also sets out the Centre's organisation chart and the staff duties [fr

  11. Plans to expand nuclear power production in Finland

    International Nuclear Information System (INIS)

    Laaksonen, J.

    2002-01-01

    The Finnish Government made in January 2002 a Decision in Principle which concludes that constructing of a new nuclear power plant in Finland is in line with the overall good of the society. The Finnish Parliament ratified the decision in May 2002. Based on this decision, the electricity generating company TVO is authorised to continue preparations for the construction of a new nuclear power plant unit

  12. Data feature: World nuclear power plant capacity 1991

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    At this point, the future of the nuclear power industry remains largely in doubt. The gloomy predictions about global warming have done little to convince politicians and the public of the benefits of nuclear power. Meanwhile, the setbacks to nuclear have continued apace: The United States has failed to take the expected lead in ordering new nuclear plants. And President-elect Bill Clinton does not consider nuclear a major part of his energy strategy. The situation looks equally bleak in other countries. Canada's biggest utility, Ontario Hydro, was forced under intense political pressure to defer its ambitious nuclear expansion program until after the year 2010. In Europe, the suspension of France's Superphenix fast-breeder reactor in June could stop progress on the technology indefinitely. And the Finnish parliament dropped plans for expansion of nuclear power from its national energy strategy. Developing and semi-industrialized countries, such as Brazil and Argentina, have shown little progress, taking upwards of twenty years to complete plants already under construction. Nuclear's problems seem always to hinge on economics. Nuclear has little chance of revival during the current global recession, especially in countries fighting for their long-term economic survival. That is why NUKEM believes nuclear power will not grow much in the CIS and Eastern Europe beyond the projects already in the advanced stages of construction. What's more, the longer countries such as Italy, the Netherlands, Spain, Switzerland and Finland keep their nuclear expansion plans on hold, the harder it will be to get the political support to restart them. So far in 1992, only two nuclear plants, with a combined capacity of 1,520 MWe, have gone into commercial operation. One more 1,330 MWe reactor may start up by year's end. By then, NUKEM expects world nuclear plant capacity to stand at 330.3 GWe

  13. Economics of nuclear power in Finland

    International Nuclear Information System (INIS)

    Tarjanne, Risto; Luostarinen, Kari

    2002-01-01

    The nuclear power generation fits perfectly with the long duration load profile of the Finnish power system. The good performance of the Finnish nuclear power has yielded benefits also to the consumers through its contribution to decreasing the electricity price. Furthermore, the introduction of nuclear power has resulted in a clear drop in carbon dioxide emissions from electricity generation in the shift of 1970's and 1980's. In the year 2001 the four Finnish nuclear power units at Loviisa and Olkiluoto generated 22.8 TWh electricity, equivalent to 28 per cent of the total consumption. Loviisa power station has a net output capacity of 2 x 488 MW, and Olkiluoto 2 x 840 MW. The capacity factors of the four nuclear units have been above 90 per cent, which are among the highest in the world. The energy-intensive process industries in particular have strong belief in nuclear power. In November 2000, Teollisuuden Voima company (TVO) submitted to the Finnish Government an application for decision in principle concerning the construction of a new nuclear power plant unit. The arguments were among other things to guarantee for the Finnish industry the availability of cheap electric energy and to meet the future growth of electricity consumption in Finland. The carbon-free nuclear power also represents the most efficient means to meet the Greenhouse Gas abatement quota of Finland. Simultaneously, the energy policy of the Government includes intensive R and D and investment support for the renewable energy sources and energy conservation, and the objective is also to replace coal with natural gas as much as reasonably possible. The fifth nuclear unit would be located in one of the existing Finnish nuclear sites, i.e. Olkiluoto or Loviisa. The size of the new nuclear unit would be in the range of 1000 to 1600 MW electric. The ready infrastructure of the existing site could be utilised resulting in lower investment cost for the new unit. The Finnish Government accepted the

  14. New Finnish radiation law

    International Nuclear Information System (INIS)

    Niittyla, A.

    1992-01-01

    The new Finnish Radiation Act will enter into force on 1.1.1992. The Act aims to protect man's health against the harmful effects of radiation. The Act applies to the utilization of ionising radiation and natural radiation as well as non-ionising radiation. It emphasises the fact that a licensed organization or entrepreneur carrying out a practice which causes radiation exposure is responsible for the safety of the activity. The organization or entrepreneur in question is also obliged to take care of radioactive waste. The provisions of the Radiation Act which apply to monitoring of worker exposure are also applied to the use of nuclear energy. Activities involving the use of radiation and the use of nuclear energy are regulated by one authority, the Finnish Centre for Radiation and Nuclear Safety. (author)

  15. Compiling Utility Requirements For New Nuclear Power Plant Project

    International Nuclear Information System (INIS)

    Patrakka, Eero

    2002-01-01

    Teollisuuden Voima Oy (TVO) submitted in November 2000 to the Finnish Government an application for a Decision-in-Principle concerning the construction of a new nuclear power plant in Finland. The actual investment decision can be made first after a positive decision has been made by the Government and the Parliament. Parallel to the licensing process, technical preparedness has been upheld so that the procurement process can be commenced without delay, when needed. This includes the definition of requirements for the plant and preliminary preparation of bid inquiry specifications. The core of the technical requirements corresponds to the specifications presented in the European Utility Requirement (EUR) document, compiled by major European electricity producers. Quite naturally, an amount of modifications to the EUR document are needed that take into account the country- and site-specific conditions as well as the experiences gained in the operation of the existing NPP units. Along with the EUR-related requirements concerning the nuclear island and power generation plant, requirements are specified for scope of supply as well as for a variety of issues related to project implementation. (author)

  16. Reliability of sprinkler systems. Exploration and analysis of data from nuclear and non-nuclear installations

    International Nuclear Information System (INIS)

    Roenty, V.; Keski-Rahkonen, O.; Hassinen, J.P.

    2004-12-01

    Sprinkler systems are an important part of fire safety of nuclear installations. As a part of effort to make fire-PSA of our utilities more quantitative a literature survey from open sources worldwide of available reliability data on sprinkler systems was carried out. Since the result of the survey was rather poor quantitatively, it was decided to mine available original Finnish nuclear and non-nuclear data, since nuclear power plants present a rather small device population. Sprinklers are becoming a key element for the fire safety in modern, open non-nuclear buildings. Therefore, the study included both nuclear power plants and non-nuclear buildings protected by sprinkler installations. Data needed for estimating of reliability of sprinkler systems were collected from available sources in Finnish nuclear and non-nuclear installations. Population sizes on sprinkler system installations and components therein as well as covered floor areas were counted individually from Finnish nuclear power plants. From non-nuclear installations corresponding data were estimated by counting relevant things from drawings of 102 buildings, and plotting from that sample needed probability distributions. The total populations of sprinkler systems and components were compiled based on available direct data and these distributions. From nuclear power plants electronic maintenance reports were obtained, observed failures and other reliability relevant data were selected, classified according to failure severity, and stored on spreadsheets for further analysis. A short summary of failures was made, which was hampered by a small sample size. From non-nuclear buildings inspection statistics from years 1985.1997 were surveyed, and observed failures were classified and stored on spreadsheets. Finally, a reliability model is proposed based on earlier formal work, and failure frequencies obtained by preliminary data analysis of this work. For a model utilising available information in the non-nuclear

  17. The Finnish Experience with the Construction of Onkalo. Licensing of a repository for nuclear waste in Finland

    International Nuclear Information System (INIS)

    Avolahti, Jaana

    2014-01-01

    Pursuant to the Nuclear Energy Act (990/1987), a license holder whose operations result, or have resulted, in the generation of nuclear waste must perform all measures included in the management of nuclear waste and preparation thereof and bear all the costs of nuclear waste management. Under law, spent nuclear fuel is regarded as nuclear waste. According to the amendment made to the Nuclear Energy Act in 1994, nuclear waste generated in Finland must be handled, stored and permanently disposed of in Finland. Nuclear waste generated elsewhere may not be handled, stored and permanently disposed of in Finland. The Finnish nuclear legislation defines spent fuel as nuclear waste and requires that it has to be disposed of in the Finnish bedrock. Over 30 years of systematic R and D has been carried out to develop the repository concept, site selection, technologies, safety assessment and the regulatory approach. Activities are based on the Finnish Government's long term strategies since 1983. The stepwise development and future plans for disposal are presented in Table 1. The licensing procedure for a disposal facility has several steps that are similar to all nuclear facilities in Finland and are defined in Nuclear Energy Act (990/1987) and Decree (161/1988). These licensing steps are: - Decision in Principle (DiP); - Construction License; - Operational License. An Environmental Impact Assessment (EIA) shall be conducted prior to the first authorization step of a major nuclear waste facility. The EIA procedure for the final disposal of spent nuclear fuel from three units of the Olkiluoto nuclear power plant and two units of the Loviisa nuclear power plant was carried out in 1998-1999 and extended to one more unit at Olkiluoto in 2008- 2009. Pursuant to the Nuclear Energy Act, before making the DiP the Government shall ascertain whether the municipality planned as the location of the nuclear facility is in favour of the facility, and ensure that no facts indicating a

  18. The role of tacit knowledge and the challenges in transferring it in the nuclear power plant context

    International Nuclear Information System (INIS)

    Hyttinen, L.; Helminen, N.

    2004-01-01

    Explicit knowledge and implementation of proper IT systems have been of concern of many organizations which recognize the importance of managing knowledge for safety operation and sustainable competitive advantage. Data and document management systems have been implemented to capture, store and distribute explicit knowledge. However, recently also awareness of the existence of tacit knowledge in organizations has arisen. What kind of role this undocumented knowledge, which the employees have acquired through their careers, plays in nuclear power plant context? This paper explores the role of tacit knowledge and the challenges related to its transfer at the two Finnish nuclear power plants. (author)

  19. Research plan on programmable automation systems in nuclear power plants (OHA) in 1995-1998

    International Nuclear Information System (INIS)

    Haapanen, P.; Pulkkinen, U.; Korhonen, J.

    1995-05-01

    The main purpose of nuclear energy research is to ensure the safety and continued development of Finnish nuclear power plants - a task which places high demands on expertise needed to support the work of public authorities and power companies. A factor necessarily influencing the orientation of the research is the Parliament's decision of late 1993 against further nuclear capacity in the country. Therefore the main emphasis of research shall be directed towards the ensuring the safety of existing plants and the continuous development of their safety along the progress of the science and technology. Anyhow, the preparedness for constructing new plants shall also be preserved. The utilization of programmable digital automation technology for the safety critical functions is the most significant change in the new plants, but also in existing plants this technology will be used for replacing and complementing the ageing automation systems. The safety evaluation of programmable digital systems can not be based on methods applied to conventional analog systems but new evaluation methods and tools must be developed for the assessing of their acceptability. (5 refs., 1 fig., 2 tabs.)

  20. Distribution and content of ellagitannins in Finnish plant species.

    Science.gov (United States)

    Moilanen, Johanna; Koskinen, Piia; Salminen, Juha-Pekka

    2015-08-01

    The results of a screening study, in which a total of 82 Finnish plant species were studied for their ellagitannin composition and content, are presented. The total ellagitannin content was determined by HPLC-DAD, the detected ellagitannins were further characterized by HPLC-ESI-QTOF-MS and divided into four structurally different sub-groups. Thirty plant species were found to contain ellagitannins and the ellagitannin content in the crude extracts varied from few mgg(-1) to over a hundred mgg(-1). Plant families that were rich in ellagitannins (>90mgg(-1) of the crude extract) were Onagraceae, Lyhtraceae, Geraniaceae, Elaeagnaceae, Fagaceae and some species from Rosaceae. Plant species that contained moderate amounts of ellagitannins (31-89mgg(-1) of the crude extract) were representatives of the family Rosaceae. Plant species that contained low amounts of ellagitannins (1-30mgg(-1) of the crude extract) were representatives of the families Betulaceae and Myricaceae. The specific ellagitannin composition of the species allowed their chemotaxonomic classification and the comparison between the older Cronquist's classification and the nowadays preferred Angiosperm Phylogeny Group classification. Copyright © 2015 Elsevier Ltd. All rights reserved.

  1. Evaluation of the Finnish nuclear safety research program 'SAFIR2010'

    International Nuclear Information System (INIS)

    2010-01-01

    A panel of three members has been asked by the Ministry of Employment and the Economy (MEE) to evaluate SAFIR2010, the Finnish research program on nuclear power plant safety. The program was established for the period 2007-2010 to help maintain expertise in nuclear safety, to integrate young people into the research in order to help assure the future availability of expertise, and to support international collaborations. The program is directed by a Steering Group, appointed by MEE, with representatives from all organizations involved with nuclear safety in Finland. SAFIR2010 has consisted of approximately 30 projects from year to year that fall into eight subject areas: 1. Organization and human factors 2. Automation and control room 3. Fuel and reactor physics 4. Thermal hydraulics 5. Severe accidents 6. Structural safety of reactor circuit 7. Construction safety 8. Probabilistic safety analysis (PSA) For each of these areas there are Reference Groups that provide oversight of the projects within their jurisdiction. The panel carried out its evaluation by reviewing copies of relevant documents and, during a one-week period 17-22 January 2010, meeting with key individuals. The results of the panel are provided as general conclusions, responses to questions posed by MEE, challenges and recommendations and comments on specific projects in each subject area. The general conclusions reflect the panel's view that SAFIR2010 is meeting its objectives and carrying out quality research. The questions addressed are: (a.) Are the achieved results in balance with the funding? Are the results exploited efficiently in practice? (b.) How well does the expertise cover the field? Is the entire SAFIR2010 programme balanced to all different fields in nuclear safety? Does it raise efficiently new experts? (c.) Have the 2006 evaluation results been implemented successfully into SAFIR2010 program? (d.) Challenges and recommendations. In general the panel was very positive about SAFIR

  2. The Nuclear Waste Fund Inquiry. Financing of nuclear waste management in Sweden and Finland and the cost control system in Sweden

    International Nuclear Information System (INIS)

    1994-01-01

    The report describes the Finnish system for financing nuclear waste management, and compares it to the swedish one. It gives an analysis of the economic effects for the waste management financing of an early shut-down of a nuclear power plant, and of a change to a new system for financing the waste management, more like the Finnish one. Finally the cost for the Swedish nuclear waste management, as estimated by SKB, is scrutinized. 25 refs

  3. National Nuclear Power Plant Safety Research 2003-2006. Proposal for the Content and Organisation of a New Research Programme

    International Nuclear Information System (INIS)

    2002-11-01

    A country utilising nuclear energy is presumed to possess a sufficient infrastructure to cover the education and research in this field, besides the operating and supervisory organisations of the plants. The starting point of public nuclear safety research programmes is that they provide the necessary conditions for retaining the knowledge needed for ensuring the continuance of safe and economic use of nuclear power, for development of new know-how and for participation in international cooperation. In fact, the Finnish organisations engaged in research in this sector have been an important resource which the various ministries, the Radiation and Nuclear Safety Authority (STUK) and the power companies have had at their disposal. The Steering Group to the Finnish Research Programme on Nuclear Power Plant Safety (FINNUS), which was launched upon the assignment of the Advisory Committee on Nuclear Energy, appointed in spring 2002 a group to plan the contents of the new programme. This report contains a proposal for the general outline of the programme, preliminarily entitled as SAFIR (SAfety of Nuclear Power Plants - Finnish National Research Programme). The plan has been made for the period 2003-2006, but it is based on safety challenges identified for a longer time span as well. The favourable decision-in-principle on a new nuclear power plant unit adopted by Parliament has also been taken into account in the plan. The safety challenges set by the existing plants and the new plant unit, as well as the ensuing research needs do, however, converge to a great extent. The construction of the new power plant unit will increase the need for experts in the field in Finland. At the same time, the retirement of the existing experts is continuing. These factors together will call for more education and training, in which active research activities play a key role. This situation also makes long-term safety research face a great challenge. The general plan aims to define the

  4. Nuclear is coming back in Finland. The finnish deputies approved the design of a new reactor

    International Nuclear Information System (INIS)

    Canton, Ch.

    2002-01-01

    The finnish Parliament agreed the construction of a fifth reactor in the country to reach an increase of 25% of its electric power consumption in 2015. The government decision and the impacts on the european nuclear industry are analyzed. (A.L.B.)

  5. The use of hardfacing alloys in nuclear power plants

    International Nuclear Information System (INIS)

    Saarinen, K.; Aaltonen, P.

    1987-08-01

    In this report the structure and applications of cobalt-, nickel- and iron-based hardfacing alloys are reviewed. Cobalt-based hardfacing alloys are widely used in nuclear power plant components due to their good wear and corrosion resistance. However, the wear and corrosion products of the cobalt-containing alloys are released into the primary cooling water and transported to the reactor core where cobalt (Co-59) is transmuted to the radioactive isotope Co-60. It has been estimated that cobalt-based hardfacing alloys are responsible for up to 90% of the total cobalt released to the primary water circuit. The cobalt based hardfacing alloys are used in such components as valves, control blade pins and pumps, etc. In the Finnish nuclear power plants they are not used in in-core components. The replacement of cobalt-containing alloys in primary cooling system components is studied in many laboratories, but substitutes for the cobalt-based alloys in the complete range of nuclear hardfacing applications have so far not been found. However, the modified austenitic stainless steels have showed good resistance to galling wear and are therefore considered substitutes for cobalt-based alloys

  6. Assessment of reliability and maintenance of motor operated valves at Finnish NPPS

    International Nuclear Information System (INIS)

    Laakso, K.; Haenninen, S.; Simola, K.

    1994-01-01

    This paper summarizes two studies on motor operated valve (MOV) failure and maintenance experiences in Finnish nuclear power plants. In the first study, described in section 2 of this paper, the failure reports of MOVs at Finnish BWR units from a nine years' time period were analyzed in a systematic way. The dominant failure mechanisms were identified and time-dependencies in failure occurrence were studied. This study initiated an experience based reliability centered maintenance (RCM) analysis of motor operated valve drives, which is summarized in chapter 3 of this paper. The RCM analysis resulted in the identification and proposal of the most suitable and effective maintenance tasks for consideration. 9 refs, 3 figs, 1 tab

  7. Environmental effects of thermal and radioactive discharges from nuclear power plants in the boreal brackish-water conditions of the northern Baltic Sea

    OpenAIRE

    Ilus, Erkki

    2009-01-01

    During recent decades, thermal and radioactive discharges from nuclear power plants into the aquatic environment have become the subject of lively debate as an ecological concern. The target of this thesis was to summarize the large quantity of results obtained in extensive monitoring programmes and studies carried out in recipient sea areas off the Finnish nuclear power plants at Loviisa and Olkiluoto during more than four decades. The Loviisa NPP is located on the coast of the Gulf of Finla...

  8. Regulatory control of nuclear safety in Finland. Annual report 1999

    Energy Technology Data Exchange (ETDEWEB)

    Tossavainen, K. [ed.

    2000-06-01

    This report concerns the regulatory control of nuclear energy in Finland in 1999. Its submission to the Ministry of Trade and Industry by the Finnish Radiation and Nuclear Safety Authority (STUK) is stipulated in section 121 of the Nuclear Energy Decree. STUK's regulatory work was focused on the operation of the Finnish nuclear power plants as well as on nuclear waste management and safeguards of nuclear materials. The operation of the Finnish nuclear power plants was in compliance with the conditions set out in their operating licences and with current regulations, with the exception of some inadvertent deviations from the Technical Specifications. No plant events endangering the safe use of nuclear energy occurred. The individual doses of all nuclear power plant workers remained below the dose threshold. The collective dose of the workers was low, compared internationally, and did not exceed STUK's guidelines at either nuclear power plant. The radioactive releases were minor and the dose calculated on their basis for the most exposed individual in the vicinity of the plant was well below the limit established in a decision of the Council of State at both Loviisa and Olkiluoto nuclear power plants. STUK issued statements to the Ministry of Trade and Industry about the environmental impact assessment programme reports on the possible nuclear power plant projects at Olkiluoto and Loviisa and about the continued operation of the research reactor in Otaniemi, Espoo. A Y2k-related safety assessment of the Finnish nuclear power plants was completed in December. In nuclear waste management STUK's regulatory work was focused on spent fuel storage and final disposal plans as well as on the treatment, storage and final disposal of reactor waste. No events occurred in nuclear waste management that would have endangered safety. A statement was issued to the Ministry of Trade and Industry about an environmental impact assessment report on a proposed final

  9. Regulatory control of nuclear safety in Finland. Annual report 1999

    International Nuclear Information System (INIS)

    Tossavainen, K.

    2000-06-01

    This report concerns the regulatory control of nuclear energy in Finland in 1999. Its submission to the Ministry of Trade and Industry by the Finnish Radiation and Nuclear Safety Authority (STUK) is stipulated in section 121 of the Nuclear Energy Decree. STUK's regulatory work was focused on the operation of the Finnish nuclear power plants as well as on nuclear waste management and safeguards of nuclear materials. The operation of the Finnish nuclear power plants was in compliance with the conditions set out in their operating licences and with current regulations, with the exception of some inadvertent deviations from the Technical Specifications. No plant events endangering the safe use of nuclear energy occurred. The individual doses of all nuclear power plant workers remained below the dose threshold. The collective dose of the workers was low, compared internationally, and did not exceed STUK's guidelines at either nuclear power plant. The radioactive releases were minor and the dose calculated on their basis for the most exposed individual in the vicinity of the plant was well below the limit established in a decision of the Council of State at both Loviisa and Olkiluoto nuclear power plants. STUK issued statements to the Ministry of Trade and Industry about the environmental impact assessment programme reports on the possible nuclear power plant projects at Olkiluoto and Loviisa and about the continued operation of the research reactor in Otaniemi, Espoo. A Y2k-related safety assessment of the Finnish nuclear power plants was completed in December. In nuclear waste management STUK's regulatory work was focused on spent fuel storage and final disposal plans as well as on the treatment, storage and final disposal of reactor waste. No events occurred in nuclear waste management that would have endangered safety. A statement was issued to the Ministry of Trade and Industry about an environmental impact assessment report on a proposed final disposal facility for

  10. World-class outage performance of the Olkiluoto nuclear power plant

    International Nuclear Information System (INIS)

    Paavola, M.

    1998-01-01

    The production of the Olkiluoto power plant units covered 17% of the electricity consumption in Finland in 1997; the total share of nuclear energy was 27% of the electricity consumed in the country. Based on Finnish experience, nuclear energy is a safe, environmentally friendly and economic way to produce electricity provided that the plants and their personnel are well taken care of. TVO's policy is to keep the plant units in good condition and technically modern. This requires continuous investments in the plant. In maintenance, attention is paid to monitoring the condition of the plant and to preventive maintenance aiming at avoiding disturbances in production. TVO has chosen continuous development as the operational line develops the plant by annual investments and performs the necessary modifications during planned annual outages trying to avoid long production interruptions. The load factors of the Olkiluoto nuclear power plant have been high. The average load factor during the last decade was over 93%. The most significant single factor in the production deficits is the amount or electricity, which has not been produced because of the annual outages. Due to this, special attention has been paid to the performance of the annual outages. TVO aims at continuous development of the annual outage procedure. A centralized task management system makes it possible to perform simultaneously more tasks than before. The company has also invested in equipment and systems, which ease and speed up servicing. Normal outage length varies between 10 and 16 days. By keeping the plant units as modern as possible and in good condition we facilitate reaching TVO's target, which is also stated in TVO's slogan 'always 40 years lifetime'. (author)

  11. Views on quality assurance at Finnish and Swedish nuclear power plants and at Halden Reactor

    International Nuclear Information System (INIS)

    Hammar, L.; Lidh, B.; Wahlstroem, B.; Reiman, T.

    2001-06-01

    The paper reports on a study within the Nordic Nuclear Safety Research, NKS on quality systems at nuclear installations in Finland, Norway and Sweden. In the study a total of 74 people at the NPPs in Barsebaeck, Forsmark, Loviisa, Olkiluoto, Oskarshamn and Ringhals, and at the research reactor in Halden were interviewed in the period 30 August to 13 December 2000 concerning their views in regard of quality and quality systems. The study was concluded with a seminar held in the Ringhals nuclear power plant in Januar 2001. The study covered a number of aspects in regard of quality management, including the quality concept, quality systems, topical quality issues and approaches, rules and procedures, competency and training, the process approach to quality management, the promotion of quality consciousness and future prospects. The study reflects the significant progress made in the management of quality in nuclear power in the Nordic countries since the early phase in the seventies. The most distinctive characteristic of today's approach to quality is seen in that responsibility for the quality is assumed directly in conjunction with the working processes. It could be noted that the work patterns at the nuclear installations have been largely modified during the recent years as a result of persistent endeavours to continuously improve the quality of operation. Challenges were seen in currently reduced revenues due to descending electricity prices and the likely prospect of further increased regulatory safety requirements. The report is aimed for those working with quality issues at the nuclear power plants as well as for those interested in quality management in general or in the safety aspects of nuclear power in particular. (au)

  12. Nuclear power plants

    International Nuclear Information System (INIS)

    1985-01-01

    Data concerning the existing nuclear power plants in the world are presented. The data was retrieved from the SIEN (Nuclear and Energetic Information System) data bank. The information are organized in table forms as follows: nuclear plants, its status and type; installed nuclear power plants by country; nuclear power plants under construction by country; planned nuclear power plants by country; cancelled nuclear power plants by country; shut-down nuclear power plants by country. (E.G.) [pt

  13. Procedure for getting safety classed concrete structures approved by Finnish Radiation and Nuclear Safety Authority

    International Nuclear Information System (INIS)

    Halme, Ville-Juhani

    2015-01-01

    Posiva is preparing geological final disposal in the Finnish bedrock in Olkiluoto, Eurajoki. The final disposal facility includes encapsulation plant and underground repository. Most of the main civil structures are concrete structures. STUK is the supervising authority in civil structures. The National Building Code of Finland and STUK's Regulatory Guide on nuclear safety (YVL) are the most important instructions when constructing concrete structures into nuclear installation. Posiva has classified concrete structures in two classes according STUK's YVL-guidance: EYT (non-nuclear) and Safety Class 3 (SC 3, nuclear safety significance). When building SC 3 concrete structures, specific protocol must be followed. Protocol includes planned routines for design, construction, supervision, quality control (QC) and quality assurance (QA) activities. Documents relating concrete structures must be approved by Posiva and STUK before construction work. After structures have been designed and actual building is ongoing, there are two main steps. Before concreting, readiness inspection for concreting must be arranged. Readiness inspection will be arranged according to a specific plan and the date must be informed to STUK. After establishing readiness for concreting, casting work can begin. Once concrete structures are done, inspected and approved, final documentation according to a quality control plan will be reviewed by Posiva. After Posiva's approval, final documentation will be sent for STUK's approval. In the end STUK will give the permission for commissioning of the concrete structures after approved commissioning inspection. The document is made up of an abstract and a poster

  14. Finnish energy outlook - role of nuclear energy

    International Nuclear Information System (INIS)

    Santaholma, J.

    2004-01-01

    New nuclear power partly covers additional electricity demand and replaces retiring power plants in coming decades after 2010. Nuclear energy secures stable, economical and predictable electricity price as well as operation environment for the electricity intensive industry for coming decades. Nuclear energy also reduces the dependence on electricity import of Finland. Nuclear energy partly enables, together with renewable, fulfilment of Finland's Kyoto commitments. Solutions for nuclear waste management are a condition sine qua non for sound nuclear programmes. Funding has been arranged. All this is carried out in Finland in a transparent way and in accordance with any democratic requirements. (author)

  15. Nuclear waste management programme 2003 for the Loviisa and Olkiluoto nuclear power plants

    International Nuclear Information System (INIS)

    2002-09-01

    A joint company Posiva Oy founded by nuclear energy producing Teollisuuden Voima Oy (TVO) and Fortum Power and Heat Oy coordinates the research work of the companies on nuclear waste management in Finland. In Posiva's Nuclear Waste Management Programme 2003, an account of the nuclear waste management measures of TVO and Fortum is given as required by the sections 74 and 75 of the Finnish Nuclear Energy Degree. At first, nuclear waste management situation and the programme of activities are reported. The nuclear waste management research for the year 2003 and more generally for the years 2003-2007 is presented

  16. Nuclear waste management plan of the Finnish TRIGA reactor

    International Nuclear Information System (INIS)

    Salmenhaara, S.E.J. . Author

    2004-01-01

    The FiR 1 - reactor, a 250 kW Triga reactor, has been in operation since 1962. The main purpose to run the reactor is now the Boron Neutron Capture Therapy (BNCT). The BNCT work dominates the current utilization of the reactor. The weekly schedule allows still one or two days for other purposes such as isotope production and neutron activation analysis. According to the Finnish legislation the research reactor must have a nuclear waste management plan. The plan describes the methods, the schedule and the cost estimate of the whole decommissioning waste and spent fuel management procedure starting from the removal of the spent fuel, the dismantling of the reactor and ending to the final disposal of the nuclear wastes. The cost estimate of the nuclear waste management plan has to be updated annually and every fifth year the plan will be updated completely. According to the current operating license of our reactor we have to achieve a binding agreement, in 2005 at the latest, between our Research Centre and the domestic nuclear power companies about the possibility to use the Olkiluoto final disposal facility for our spent fuel. There is also the possibility to make the agreement with USDOE about the return of our spent fuel back to USA. If we want, however, to continue the reactor operation beyond the year 2006, the domestic final disposal is the only possibility. In Finland the producer of nuclear waste is fully responsible for its nuclear waste management. The financial provisions for all nuclear waste management have been arranged through the State Nuclear Waste Management Fund. The main objective of the system is that at any time there shall be sufficient funds available to take care of the nuclear waste management measures caused by the waste produced up to that time. The system is applied also to the government institutions like FiR 1 research reactor. (author)

  17. Environmental effects of thermal and radioactive discharges from nuclear power plants in the boreal brackish-water conditions of the northern Baltic Sea

    International Nuclear Information System (INIS)

    Ilus, E.

    2009-08-01

    During recent decades, thermal and radioactive discharges from nuclear power plants into the aquatic environment have become the subject of lively debate as an ecological concern. Recently, an increasing demand for facts has appeared in context with the Environmental Impact Assessment procedures that are being in progress for planned new nuclear power units in Finland. The target of this thesis was to summarize the large quantity of results obtained in extensive monitoring programmes and studies carried out in recipient sea areas off the Finnish nuclear power plants at Loviisa and Olkiluoto during more than four decades. Especially in the conditions specific for the northern Baltic Sea, where biota is poor and adapted to relatively low temperatures and to seasonal variation with a cold ice winter and a temperate summer, an increase in temperature may cause increased environmental stress to the organisms. Furthermore, owing to the brackish-water character of the Baltic Sea, many organisms live there near the limit of their physiological tolerance. On the other hand, the low salinity increases the uptake of certain radionuclides by many organisms in comparison with oceanic conditions. The sea areas surrounding the Finnish nuclear power plants differ from each other in many respects (efficiency of water exchange, levels of nutrients and other water quality parameters, water salinity and consequent differences in species composition, abundance and vitality of biota). In addition, there are differences in the discharge quantities and discharge design of the power plants. In this thesis the environmental effects of the two power plants on the water recipients are compared and their relative significance is assessed

  18. Overview on recent results of the VTT's research programme on assuring nuclear power plant structural safety

    International Nuclear Information System (INIS)

    Rintamaa, R.; Aaltonen, P.; Kauppinen, P.; Keinaenen, H.; Talja, H.; Valo, M.; Wallin, K.; Toerroenen, K.

    1994-01-01

    An overview of the Finnish national research programme on the Nuclear Power Plant Structural Safety, being carried out from 1990 to 1994, is presented. The focus of this paper is on recent results in the areas of experimental and computational fracture mechanics, material deterioration due to neutron irradiation, corrosion and water chemistry, nondestructive testing methods and procedures, and verification of structural integrity assessment methods by large scale component tests. (author). 21 refs, 21 figs, 2 tabs

  19. The role of tacit knowledge and the challenges in transferring it: A case study at the Finnish NPPs

    International Nuclear Information System (INIS)

    Hyttinen, L.; Rintala, N.

    2005-01-01

    Explicit knowledge and implementation of proper IT systems have been of concern of many organisations which recognise the importance of managing knowledge for safety operation and sustainable competitive advantage. Data and document management systems have been implemented to capture, store and distribute explicit knowledge. However, recently also awareness of the existence of tacit knowledge in organisations has arisen. What kind of role does this undocumented knowledge, which the employees have acquired throughout their careers, play in nuclear power plant context? This paper explores the role of tacit knowledge and the challenges related to its transfer at the two Finnish nuclear power plants. (author)

  20. Finnish support programme to IAEA safeguards. Annual report 1994

    International Nuclear Information System (INIS)

    Tarvainen, M.

    1995-05-01

    Implementation of the Finnish Support Programme to IAEA Safeguards (FINSP) during the calender year in question is summarized. FINSP is carried out trough separate tasks concentrating on verification of nuclear material, training and expert services to the IAEA. In addition to the Finnish summary, the report includes detailed description of each task in English

  1. Finnish energy outlook - role of nuclear energy

    International Nuclear Information System (INIS)

    Santaholma, J.

    2004-01-01

    In this presentation author deals with production a consumption of electricity in the Finland. New nuclear power partly covers additional electricity demand and replaces retiring power plants in coming decades after 2010. Nuclear energy secures stable, economical and predictable electricity price as well as operation environment for the electricity intensive industry for coming decades. Nuclear energy also reduces the dependence on electricity import of Finland. Nuclear energy partly enables, together with renewable, fulfilment of Finland's Kyoto commitments. Solutions for nuclear waste management are a condition sine qua non for sound nuclear programmes. Funding has been arranged. All this is carried out in Finland in a transparent way and in accordance with any democratic requirements. (author)

  2. Structural analysis of nuclear components

    International Nuclear Information System (INIS)

    Ikonen, K.; Hyppoenen, P.; Mikkola, T.; Noro, H.; Raiko, H.; Salminen, P.; Talja, H.

    1983-05-01

    THe report describes the activities accomplished in the project 'Structural Analysis Project of Nuclear Power Plant Components' during the years 1974-1982 in the Nuclear Engineering Laboratory at the Technical Research Centre of Finland. The objective of the project has been to develop Finnish expertise in structural mechanics related to nuclear engineering. The report describes the starting point of the research work, the organization of the project and the research activities on various subareas. Further the work done with computer codes is described and also the problems which the developed expertise has been applied to. Finally, the diploma works, publications and work reports, which are mainly in Finnish, are listed to give a view of the content of the project. (author)

  3. Progressive Finland sees progress with nuclear projects

    Energy Technology Data Exchange (ETDEWEB)

    Dalton, David [NucNet, Brussels (Belgium)

    2016-02-15

    The Finnish Hanhikivi-1 reactor project is firmly on track and a licence has been granted for construction of a final disposal facility for spent nuclear fuel - the first final repository in the world to enter the construction phase. Significant progress has been made with plans for Finland to build its sixth nuclear reactor unit at Hanhikivi. Fennovoima's licensing manager Janne Liuko said the company expects to receive the construction licence for the Generation III+ Hanhikivi-1 plant in late 2017. The application was submitted to the Finnish Ministry of Employment and the Economy in June 2015.

  4. Can we ever build lots of new nuclear plants?

    International Nuclear Information System (INIS)

    Kidd, St.

    2004-01-01

    The order to construct the fifth high-power Finnish reactor is both a significant even for the West-European nuclear power sector and a promising event for the development of the world nuclear power sector. One considers the peculiar features of the economic situation in Finland as compared with other countries. One underlines that to ensure the competitive power of new nuclear power units in the liberalized energy markets one shall ensure essential reduction of the capital costs [ru

  5. Severe accidents and nuclear containment integrity (SANCY). SANCY summary report

    Energy Technology Data Exchange (ETDEWEB)

    Lindholm, I. [VTT Processes, Espoo (Finland)

    2004-07-01

    SANCY project investigates physical phenomena related to severe nuclear accidents with importance to Finnish nuclear power plants. Currently the major topics are the ex-vessel coolability issues, long-term severe accident management and containment leak tightness and adoption and development of new calculation tools considering also the needs of the future Olkiluoto 3 plant. SANCY employs both experimental and analytical methods. (orig.)

  6. The site of a nuclear power plant and environmental safety; Ydinvoimalaitoksen sijaintipaikka ja ympaeristoen turvallisuus

    Energy Technology Data Exchange (ETDEWEB)

    Rossi, J. [VTT Energy, Espoo (Finland)

    2001-11-01

    guidelines concerning nuclear power plant safety and in the guides of the Radiation and Nuclear Safety Authority (STUK). International Atomic Energy Agency (IAEA) has published the Safety Standard concerning the site selection. There are two nuclear power plant sites in Finland; Olkiluoto in Eurajoki municipality and Haestholmen in the town of Loviisa; both of these are also proposed for the site of a new nuclear power plant unit in the application for decision in principle submitted to the Council of State by Teollisuuden Voima Oy (TVO). The Finnish sites are located on the coast, but in other countries there are also inland sites. The surroundings of the Finnish sites are relatively sparsely populated compared with e.g. the sites in USA and in Germany. Concerning external initial events, Finland is calm area, e.g. bedrock is stable and severe weather phenomena are not occurring. Persons and their organisations participating in the design, building and operation of a nuclear power plant as well as controlling these activities have an essential role in creating, maintaining and development of safety. Thus particular attention is paid to their ability and operational preconditions as well as to the quality control methods and safety culture of their organisations. The safety of the plant is based partly on design basis, according to which the plant shall survive in a sufficient way from incidents and accidents. Design bases include internal events of the power plant and external events such as flood, earthquake and crash of an aeroplane. The power plant is aimed to be constructed in such a way that it would not be damaged in an accident to such extent that radioactive material would be released to the environment. Applying appropriate rescue or radiation protection measures such as local sheltering, iodine tablets and evacuation can mitigate offsite damages possibly followed by the release caused by an accident. In addition to deterministic analyses accomplished to prove out

  7. Review of safety related control room function research based on experience from nuclear power plants in Finland

    International Nuclear Information System (INIS)

    Juslin, K.; Wahlstroem, B.; Rinttilae, E.

    1985-01-01

    A comprehensive human engineering research programme was established in the second half of the 1970's at the Technical Research Centre of Finland (VTT). The research is performed in cooperation with the utility companies Imatran Voima Oy (IVO) and Teollisuuden Voima Oy (TVO) and includes topics such as Handling of alarm information, Disturbance analysis systems, Assessment of control rooms and Validation of safety parameter display systems. Reference is also made to the Finnish contribution to the OECD Halden Reactor Project (Halden) and the Nordic Liaison Committee for Atomic Energy (NKA) research projects. In this paper feasible realization alternatives of safety related control room functions are discussed on the basis of experience from the nuclear power plants in Finland, which at present are equipped with extensive process computer systems. A proposal for future power plant information systems is described. It is intended that this proposal will serve as the basis for future computer systems at nuclear power plants in Finland. (author)

  8. Regulatory control of nuclear facility valves and their actuators

    International Nuclear Information System (INIS)

    1993-01-01

    The methods and procedures by which the Finnish Centre for Radiation and Nuclear Safety (STUK) regulates valves and their actuators in nuclear power plants and in other nuclear facilities are specified in the guide. The scope of regulation depends on the Safety Class of the valve and the actuator in question. The Safety Classification principles for the systems, structures and components of the nuclear power plants are described in the guide YVL 2.1 and the regulatory control of the nuclear facility safety valves is described in the guide YVL 5.4

  9. International Working Group on Life Management of Nuclear Power Plants. (IWG-LMNPP). Regular meeting. Working material. V. 1

    International Nuclear Information System (INIS)

    1998-01-01

    National programs of Argentina, Brazil, Belgium, Czech Republic, Canada, France and Germany related to nuclear power plants life management presented at the Technical Committee Meeting are published in this volume. Finnish report VTT-TIED-1843 included in this volume was already included separately in the INIS Database. The main features of the reports are oriented towards extension of NPP lifetime and conditions indispensable to achieve in order to fulfil the safety requirements including testing the mechanical properties of relevant reactor components

  10. Nuclear power plants

    International Nuclear Information System (INIS)

    Margulova, T.Ch.

    1976-01-01

    The textbook focuses on the technology and the operating characteristics of nuclear power plants equiped with pressurized water or boiling water reactors, which are in operation all over the world at present. The following topics are dealt with in relation to the complete plant and to economics: distribution and consumption of electric and thermal energy, types and equipment of nuclear power plants, chemical processes and material balance, economical characteristics concerning heat and energy, regenerative preheating of feed water, degassing and condenser systems, water supply, evaporators, district heating systems, steam generating systems and turbines, coolant loops and pipes, plant siting, ventilation and decontamination systems, reactor operation and management, heat transfer including its calculation, design of reactor buildings, and nuclear power plants with gas or sodium cooled reactors. Numerous technical data of modern Soviet nuclear power plants are included. The book is of interest to graduate and post-graduate students in the field of nuclear engineering as well as to nuclear engineers

  11. The utmost ends of the nuclear fuel cycle. How Finns perceive the risks of uranium mining and nuclear waste management

    Energy Technology Data Exchange (ETDEWEB)

    Litmanen, Tapio (Univ. of Jyvaeskylae, Dept. of Social Sciences and Philosophy, Jyvaeskylae (Finland)), e-mail: Tapio.Litmanen@jyu.fi

    2010-09-15

    The aim of the paper is to analyze how Finns perceive the risks of uranium mining and nuclear waste management. In social science quite much research has been done on the issue of how people perceive the risks of nuclear waste and nuclear waste management, but not much has been done in analyzing the similarities and differences of risk perception (and ethical considerations) of the utmost ends of nuclear fuel cycle. There have been some changes in Finnish nuclear policy during ongoing decade, which make this type of study interesting: decision on the fifth nuclear power plant was done in 2002, the site for spent nuclear fuel has been chosen in 2001 and in 2010 the Parliament will decide which of three competitors will get the permission to construct the sixth nuclear power plant. This national nuclear renaissance was accompanied with the uranium boom, which started in 2005. New international interest in nuclear power had raised the price of uranium. International mining companies started uranium explorations because Finnish bedrock is the oldest in Europe, and it is similar with and also of the same age as is that of the great uranium producers, Canada and Australia. The analysis of risk perceptions between uranium questions and spent nuclear fuel is based on the national survey data (N=1180) gathered in 2007

  12. The utmost ends of the nuclear fuel cycle. How Finns perceive the risks of uranium mining and nuclear waste management

    International Nuclear Information System (INIS)

    Litmanen, Tapio

    2010-09-01

    The aim of the paper is to analyze how Finns perceive the risks of uranium mining and nuclear waste management. In social science quite much research has been done on the issue of how people perceive the risks of nuclear waste and nuclear waste management, but not much has been done in analyzing the similarities and differences of risk perception (and ethical considerations) of the utmost ends of nuclear fuel cycle. There have been some changes in Finnish nuclear policy during ongoing decade, which make this type of study interesting: decision on the fifth nuclear power plant was done in 2002, the site for spent nuclear fuel has been chosen in 2001 and in 2010 the Parliament will decide which of three competitors will get the permission to construct the sixth nuclear power plant. This national nuclear renaissance was accompanied with the uranium boom, which started in 2005. New international interest in nuclear power had raised the price of uranium. International mining companies started uranium explorations because Finnish bedrock is the oldest in Europe, and it is similar with and also of the same age as is that of the great uranium producers, Canada and Australia. The analysis of risk perceptions between uranium questions and spent nuclear fuel is based on the national survey data (N=1180) gathered in 2007

  13. Exchange of dose data within nuclear activities in Finland and Sweden

    International Nuclear Information System (INIS)

    Vilkamo, O.; Malmqvist, L.

    1988-01-01

    In the Nordic countries, Denmark, Finland, Iceland, Norway and Sweden, only Sweden and Finland have introduced nuclear power into energy production. The first still operating nuclear power plant was commissioned in Sweden in 1972 and in Finland in 1977. It was soon noticed that there was a growing tendency that small groups of workers used to move at short notice between Finland and Sweden to work in the nuclear power plants in both countries during maintenance periods. In 1983, the regulatory authorities for radiation protection, National Institute of Radiation Protection in Sweden and Finnish Centre for Radiation and Nuclear Safety in Finland, surveyed the radiation exposure to those workers. The authorities have brought about an arrangement by means of which the central dose data bases in the other country since 1984 have been able to record without delay the radiation doses received by her own citizens in the nuclear power plants of the neighbouring country. In addition, the authorities have confirmed the procedures of controlling dose data on workers from the neighbouring country, before those workers start working in a nuclear power plant regulated by the national authorities in question. The paper describes the starting point of the activity, the established practice and the experience achieved. Until now, the practical experiences are positive. The total radiation exposure to the workers in the Swedish and Finnish nuclear power plants has been relatively low at each plant site. Thus, the main objective in the exchange of dose data, is to achieve a good radiation protection control

  14. Examples for cost reduction in the design of a WWER-1000 nuclear power plant

    International Nuclear Information System (INIS)

    Kukkola, T.

    1991-01-01

    In a design project during recent years, a version for Finnish conditions has been and is being developed based on the Soviet WWER-1000 PWR plant with four horizontal steam generators. The plant will have a double containment. The inner containment will be a dry full pressure prestressed concrete containment with liner and the secondary containment will be made of ordinary concrete. Four train safety approach is adopted. It is supposed that the plant is to be designed according to the present Finnish safety requirements, e.g. severe reactor accidents are considered. When striving at an economic plant no compromises are made as far as safety is concerned. This paper describes possible cost reduction by redesigning the main technical equipment. (author). 1 ref

  15. Nuclear power. Volume 1. Nuclear power plant design

    International Nuclear Information System (INIS)

    Pedersen, E.S.

    1978-01-01

    NUCLEAR POWER PLANT DESIGN is intended to be used as a working reference book for management, engineers and designers, and as a graduate-level text for engineering students. The book is designed to combine theory with practical nuclear power engineering and design experience, and to give the reader an up-to-date view of the status of nuclear power and a basic understanding of how nuclear power plants function. Volume 1 contains the following chapters; (1) nuclear reactor theory; (2) nuclear reactor design; (3) types of nuclear power plants; (4) licensing requirements; (5) shielding and personnel exposure; (6) containment and structural design; (7) main steam and turbine cycles; (8) plant electrical system; (9) plant instrumentation and control systems; (10) radioactive waste disposal (waste management) and (11) conclusion

  16. Regulatory aspects of Olkiluoto 3 nuclear power plant (EPR-1600) (Draft, 12 Sept. 2005)

    International Nuclear Information System (INIS)

    Sandberg, J.; Tiippana, P.

    2005-01-01

    A 1600 MWe European Pressurized Water Reactor (EPR) supplied by the Framatome ANP - Siemens Consortium is under construction at the Olkiluoto site in Finland. Current international safety requirements and especially French and German operating experience have been applied in the design. Finnish requirements and operating experience have also been applied, especially regarding site-specific features. Severe accidentmanagement and protection against a collision of a large passenger airplane are implemented in the plant design. The plant safety features, licensing procedure, Finnish regulatory requirements, changes to the original EPR design, project quality management and regulatory control are discussed. (author)

  17. Documents pertaining to safety control of nuclear facilities

    International Nuclear Information System (INIS)

    1998-01-01

    The Finnish Radiation and Nuclear Safety Authority (STUK) controls the safety of nuclear facilities in Finland. This control encompasses on one hand the evaluation of plant safety on the basis of plans and analyses pertaining to the plant and on the other hand the inspection of plant structures, systems and components as well as of operational activity. STUK also monitors plants operational experience feedback and technical developments in the field, as well as the development of safety research and takes the necessary measures on their basis. Guide YVL 1.1 describes how STUK controls the design, construction and operation of nuclear power plants. The documents to be submitted to STUK are described in the nuclear energy legislation and YVL guides. This guide presents the mode of delivery, quality, contents and number of documents to be submitted to STUK

  18. Integrated Nuclear Recycle Plant

    International Nuclear Information System (INIS)

    Patodi, Anuj; Parashar, Abhishek; Samadhiya, Akshay K.; Ray, Saheli; Dey, Mitun; Singh, K.K.

    2017-01-01

    Nuclear Recycle Board (NRB), Tarapur proposes to set up an 'Integrated Nuclear Recycle Plant' at Tarapur. This will be located in the premises of BARC facilities. The project location is at coastal town of Tarapur, 130 Km north of Mumbai. Project area cover of INRP is around 80 hectares. The plant will be designed to process spent fuel received from Pressurized Heavy Water Reactors (PHWRs). This is the first large scale integrated plant of the country. INRP will process spent fuel obtained from indigenous nuclear power plants and perform left over nuclear waste disposal

  19. Background information for NDT qualification of Finnish disposal canisters of spent fuel

    International Nuclear Information System (INIS)

    Sarkimo, M.; Pitkaenen, J.

    2013-12-01

    This report presents a review to basic concepts, which are applied in the qualification of non-destructive testing (NDT) techniques. The qualification systems developed and used in some countries are briefly described in the beginning of the report. Anyway the report mainly discusses the qualification practices applied in the Finnish nuclear industry. The Finnish Radiation and Nuclear Safety Authority (STUK) in the YVL Guide 3.8 define the Finnish qualification approach applied for the in-service inspections. The principles presented in this document follow the views of the international organisations: Nuclear Regulator Working Group (NRWG) and European Network for Inspection and Qualification (ENIQ). For the practical qualification work a national guideline is established using so called SP-documents that include specific rules and instructions for execution of qualifications in accordance with YVL Guide 3.8 principles. Altogether the Finnish qualification system can be seen very well to follow the European (ENIQ) methodology. The report discusses several qualification terms and documents. Thus the normally necessary tasks and parts of a qualification are described. The qualification can be seen as a project that includes several tasks, which will be performed by different parties. Enough resources and time should be reserved for the planning and control of a qualification project to ensure its fluent progress. Some tasks are discussed in the report taking into account the situation in the qualification cases that are seen to be linked to the inspections of disposal canisters of spent fuel. (orig.)

  20. Background information for NDT qualification of Finnish disposal canisters of spent fuel

    Energy Technology Data Exchange (ETDEWEB)

    Sarkimo, M. [VTT Technical Research Centre of Finland, Espoo (Finland); Pitkaenen, J.

    2013-12-15

    This report presents a review to basic concepts, which are applied in the qualification of non-destructive testing (NDT) techniques. The qualification systems developed and used in some countries are briefly described in the beginning of the report. Anyway the report mainly discusses the qualification practices applied in the Finnish nuclear industry. The Finnish Radiation and Nuclear Safety Authority (STUK) in the YVL Guide 3.8 define the Finnish qualification approach applied for the in-service inspections. The principles presented in this document follow the views of the international organisations: Nuclear Regulator Working Group (NRWG) and European Network for Inspection and Qualification (ENIQ). For the practical qualification work a national guideline is established using so called SP-documents that include specific rules and instructions for execution of qualifications in accordance with YVL Guide 3.8 principles. Altogether the Finnish qualification system can be seen very well to follow the European (ENIQ) methodology. The report discusses several qualification terms and documents. Thus the normally necessary tasks and parts of a qualification are described. The qualification can be seen as a project that includes several tasks, which will be performed by different parties. Enough resources and time should be reserved for the planning and control of a qualification project to ensure its fluent progress. Some tasks are discussed in the report taking into account the situation in the qualification cases that are seen to be linked to the inspections of disposal canisters of spent fuel. (orig.)

  1. Nuclear plant simulation using the Nuclear Plant Analyzer

    International Nuclear Information System (INIS)

    Beelman, R.J.; Laats, E.T.; Wagner, R.J.

    1984-01-01

    The Nuclear Plant Analyzer (NPA), a state-of-the-art computerized safety analysis and engineering tool, was employed to simulate nuclear plant response to an abnormal transient during a training exercise at the US Nuclear Regulatory Commission (USNRC) in Washington, DC. Information relative to plant status was taken from a computer animated color graphics display depicting the course of the transient and was transmitted to the NRC Operations Center in a manner identical to that employed during an actual event. Recommendations from the Operations Center were implemented during on-line, interactive execution of the RELAP5 reactor systems code through the NPA allowing a degree of flexibility in training exercises not realized previously. When the debriefing was conducted, the RELAP5 calculations were replayed by way of the color graphics display, adding a new dimension to the debriefing and greatly enhancing the critique of the exercise

  2. Report of the Committee for Nuclear Energy Competence in Finland

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-07-01

    In October 2010, the Ministry of Employment and the Economy set up a committee to examine the long-term competence needs of the nuclear energy sector. The study was implemented by a group of experts ensuring extensive representation of the nuclear energy sector. One of the key conclusions was that comprehensive high-standard national competence is needed by nuclear sector companies and research institutes, as well as by authorities. Training of experts and sector-specific research activities call for long-term investments and cooperation, both among national actors and on an international scale. Competence needs in Finland's nuclear energy sector are growing. The nuclear power plant units presently in operation, as well as the Olkiluoto 3 unit under construction, require a competent labour force on a continuous basis. Posiva must have readiness for commencing final disposal of spent fuel by 2020. The new nuclear power projects - TVO's Olkiluoto 4 and Fennovoima's nuclear power plant, which were given favourable decisions-in-principle by the Government in 2010 - will particularly increase the need for experts. In its statement when ratifying these decisions-in-principle on 1 July 2010 Parliament required that the Government will, for its own part, create the preconditions for utilising Finnish labour, knowledge and business life as far as possible in nuclear power projects. The appointment letter of 27 October 2010 assigns the following duties to the Committee for Nuclear Energy Competence: (1) to survey the present personnel resources of nuclear actors; (2) to conduct an extensive review of the need for Finnish basic higher education, postgraduate education, further education and supplementary training; (3) to investigate the opportunities for Finnish participation in the forthcoming major nuclear power plant projects; (4) to survey the research infrastructure available to nuclear actors and research; (5) to examine Finnish research activities and

  3. RETU. The Finnish research programme on reactor safety. Interim report 1995 - May 1997

    International Nuclear Information System (INIS)

    Vanttola, T.; Puska, E.K.

    1997-08-01

    The Finnish national research programme on Reactor Safety (RETU, 1995-1998) concentrates on the search of safe limits of nuclear fuel and the reactor core, accident management methods and risk management of the operation of nuclear power plants. The annual volume of the programme has been about 26 person years and the annual funding FIM 15 million. This report summarises the structure and objectives of the programme, research fields included and the main results obtained during the period 1995 - May 1997. In the field of operational margins of a nuclear reactor, the behaviour of high burnup nuclear fuel is studied both in normal operation and during power transients. The static and dynamic reactor analysis codes are developed and validated to cope with new fuel designs and complicated three-dimensional reactivity transients and accidents. Research on accident management aims at development and validation of calculation methods needed to plan preventive measures and to train the personnel to severe accident mitigation. Other goals are to reduce uncertainties in phenomena important in severe accidents and to study actions planned for accident management. In the field of risk management probabilistic methods are developed for safety related decision making and for complex phenomena and event sequences. Effects of maintenance on nuclear power plant safety are studied and more effective methods for the assessment of human reliability and safety critical organisations are searched

  4. RETU. The Finnish research programme on reactor safety. Interim report 1995 - May 1997

    Energy Technology Data Exchange (ETDEWEB)

    Vanttola, T; Puska, E K [VTT Energy, Espoo (Finland). Nuclear Energy; eds.

    1997-08-01

    The Finnish national research programme on Reactor Safety (RETU, 1995-1998) concentrates on the search of safe limits of nuclear fuel and the reactor core, accident management methods and risk management of the operation of nuclear power plants. The annual volume of the programme has been about 26 person years and the annual funding FIM 15 million. This report summarises the structure and objectives of the programme, research fields included and the main results obtained during the period 1995 - May 1997. In the field of operational margins of a nuclear reactor, the behaviour of high burnup nuclear fuel is studied both in normal operation and during power transients. The static and dynamic reactor analysis codes are developed and validated to cope with new fuel designs and complicated three-dimensional reactivity transients and accidents. Research on accident management aims at development and validation of calculation methods needed to plan preventive measures and to train the personnel to severe accident mitigation. Other goals are to reduce uncertainties in phenomena important in severe accidents and to study actions planned for accident management. In the field of risk management probabilistic methods are developed for safety related decision making and for complex phenomena and event sequences. Effects of maintenance on nuclear power plant safety are studied and more effective methods for the assessment of human reliability and safety critical organisations are searched. 135 refs.

  5. Implications of the Fukushima accident of nuclear safety in Finland

    International Nuclear Information System (INIS)

    Valtonen, Keijo

    2012-01-01

    A severe accident took place in Japan at Fukushima Dai-ichi nuclear power plant in March 2011. The immediate cause of the accident was a tsunami caused by the earthquake and the fact that the consequences of large tsunamis were not adequately considered in the design of the plant. Although tsunamis are not considered a real threat in Europe, the European Council requested on 25 March 2011 the European Nuclear Safety Regulators' Group (ENSREG) and the European Commission to undertake a comprehensive and transparent risk and safety assessment (''stress test'') of European nuclear power plants [ENSREG 2011A]. This report is prepared to evaluate the safety provisions of Finnish Nuclear Power Plants as specified in the European ''stress tests''. The technical description is based on the Licensees' reports on the issues within these specifications [Fortum 2011; TVO 2011]. Furthermore, evaluation on the current situation carried out by Radiation and Nuclear Safety Authority (STUK) is provided, and the possibilities to further enhance safety in the Finnish NPPs are presented. According to the ENSREG specifications, earthquakes, flooding and extreme weather conditions were studied in the stress tests. In addition, consequences of losses of some safety functions and finally management of severe accidents were studied, irrespective of their probabilities. The European stress tests cover in Finland all the operating nuclear power plants (Loviisa 1 and 2, Olkiluoto 1 and 2) and the unit under construction (Olkiluoto 3). The intermediate storages of spent fuel in Loviisa and in Olkiluoto are included in the stress tests. The new NPP units to be constructed which do not yet have a construction license, (Fennovoima 1, Olkiluoto 4) are not considered in the European stress tests. (orig.)

  6. Why low doses at Finnish NPPs?

    International Nuclear Information System (INIS)

    Wahlstroem, B.; Vaehaemaa, T.

    1995-01-01

    The Finnish nuclear power units - two BWRs (ABB Atom) and two PWRs (VVER) -are known for their high load factors. Finland's reactors have topped the world ranking list for more than ten years. This explains why their collective radiation doses are among the lowest in the world. During normal operation a collective dose of less than ten millisieverts per month is received at one site

  7. Nuclear power plant siting

    International Nuclear Information System (INIS)

    Sulkiewicz, M.; Navratil, J.

    The construction of a nuclear power plant is conditioned on territorial requirements and is accompanied by the disturbance of the environment, land occupation, population migration, the emission of radioactive wastes, thermal pollution, etc. On the other hand, a nuclear power plant makes possible the introduction of district heating and increases the economic and civilization activity of the population. Due to the construction of a nuclear power plant the set limits of negative impacts must not be exceeded. The locality should be selected such as to reduce the unfavourable effects of the plant and to fully use its benefits. The decision on the siting of the nuclear power plant is preceded by the processing of a number of surveys and a wide range of documentation to which the given criteria are strictly applied. (B.H.)

  8. Images of nuclear power plants

    International Nuclear Information System (INIS)

    Hashiguchi, Katsuhisa; Misumi, Jyuji; Yamada, Akira; Sakurai, Yukihiro; Seki, Fumiyasu; Shinohara, Hirofumi; Misumi, Emiko; Kinjou, Akira; Kubo, Tomonori.

    1995-01-01

    This study was conducted to check and see, using Hayashi's quantification method III, whether or not the respondents differed in their images of a nuclear power plant, depending on their demographic variables particularly occupations. In our simple tabulation, we compared subject groups of nuclear power plant employees with general citizens, nurses and students in terms of their images of a nuclear power plant. The results were that while the nuclear power plant employees were high in their evaluations of facts about a nuclear power plant and in their positive images of a nuclear power plant, general citizens, nurses and students were overwhelmingly high in their negative images of a nuclear power plant. In our analysis on category score by means of the quantification method III, the first correlation axis was the dimension of 'safety'-'danger' and the second correlation axis was the dimension of 'subjectivity'-'objectivity', and that the first quadrant was the area of 'safety-subjectivity', the second quadrant was the area of 'danger-subjectivity', the third quadrant as the area of 'danger-objectivity', and the forth quadrant was the area of 'safety-objectivity'. In our analysis of sample score, 16 occupation groups was compared. As a result, it was found that the 16 occupation groups' images of a nuclear power plant were, in the order of favorableness, (1) section chiefs in charge, maintenance subsection chiefs, maintenance foremen, (2) field leaders from subcontractors, (3) maintenance section members, operation section members, (4) employees of those subcontractors, (5) general citizens, nurses and students. On the 'safety-danger' dimension, nuclear power plant workers on the one hand and general citizens, nurses and students on the other were clearly divided in terms of their images of a nuclear power plant. Nuclear power plant workers were concentrated in the area of 'safety' and general citizens, nurses and students in the area of 'danger'. (J.P.N.)

  9. Elecnuc. Nuclear power plants in the world

    International Nuclear Information System (INIS)

    2003-01-01

    This 2003 version of Elecnuc contents information, data and charts on the nuclear power plants in the world and general information on the national perspectives concerning the electric power industry. The following topics are presented: 2002 highlights; characteristics of main reactor types and on order; map of the French nuclear power plants; the worldwide status of nuclear power plants on 2002/12/3; units distributed by countries; nuclear power plants connected to the Grid by reactor type groups; nuclear power plants under construction; capacity of the nuclear power plants on the grid; first electric generations supplied by a nuclear unit; electrical generation from nuclear plants by country at the end 2002; performance indicator of french PWR units; trends of the generation indicator worldwide from 1960 to 2002; 2002 cumulative Load Factor by owners; nuclear power plants connected to the grid by countries; status of license renewal applications in Usa; nuclear power plants under construction; Shutdown nuclear power plants; exported nuclear power plants by type; exported nuclear power plants by countries; nuclear power plants under construction or order; steam generator replacements; recycling of Plutonium in LWR; projects of MOX fuel use in reactors; electricity needs of Germany, Belgium, Spain, Finland, United Kingdom; electricity indicators of the five countries. (A.L.B.)

  10. The role of the Finnish Meteorological Institute

    International Nuclear Information System (INIS)

    Savolainen, A.L.; Valkama, I.

    1993-01-01

    The Finnish Meteorological Institute is responsible for the dispersion forecasts for the radiation control in Finland. In addition to the normal weather forecasts the duty forecaster has the work station based three dimensional trajectory model and the short range dispersion model YDINO at his disposal. For expert use, dispersion and dose model TRADOS is available. The TRADOS, developed by the Finnish Meteorological Institute and by the Technical Research Centre of Finland, includes a meteorological data base that utilizes the numerical forecasts of the High Resolution Limited Area Model (HIRLAM) weather prediction model. The transport is described by three-dimensional air-parcel trajectories. For each time step the integrated air concentrations as well as dry and wet deposition for selected groups of radionuclides are computed. In the operational emergency application only external dose rates are computed. In the statistical version also individual and population dose estimates via several external and internal pathways can be made. The TRADOS is currently run under two separate user interfaces. The trajectory and dispersion model interface includes ready-made lists of the nuclear power plants and other installations. The dose model has a set of release terms for several groups of radionuclides. There is also a graphical module that enables the computed results to be presented in grid or also isolines. A new graphical user interface and presentation lay-outs redesigned as visual and end-user friendly as possible and with the aim of possible and with the aim of possible adoption as a Nordic standard will be installed in the near future. (orig.)

  11. 76 FR 1469 - Calvert Cliffs Nuclear Power Plant, LLC; Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2...

    Science.gov (United States)

    2011-01-10

    ... Nuclear Power Plant, LLC; Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 Environmental Assessment... Plant, LLC, the licensee, for operation of the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2... Impact Statement for License Renewal of Nuclear Plants, Calvert Cliffs Nuclear Power Plant (NUREG-1437...

  12. Decision on the fifth nuclear unit in Finland - 17 years of decision-making

    Energy Technology Data Exchange (ETDEWEB)

    Santaholma, Juhani [Perusvoima Oy (Finland)

    1993-07-01

    This paper shows the process of decision making on the fifth nuclear power plants in Finland that took 17 years. The opinion polls show that about 50% of the Finns are opposing the construction of the fifth NPP, 30% are in favour and 20% don't know or have no firm opinion. This situation has lasted for more than two years. The opinion of the Finnish industry and power utilities is, however, that if the decision makers have courage to make positive decision it will not lead to a revolution in Finland. The industry and the utilities have for many years done systematic work with the media, both the press and the electronic. The media debate has been rather low key reporting, but any incidents get a lot of space, especially events at the Russian and Baltic plants near the Finnish borders. There is a constant flow of reporting from Chernobyl and Chelyabinsk and other questionable Russian facilities in the Finnish media. The five Swedish reactors shut-down for repair have been widely reported. It also seems that false reports and articles in the leading international media, press and TV, find their way to Finnish media, as well. In other respects, the media climate in Finland is rather businesslike. It is evident that the sensational TV programmes have an effect on the Finnish nuclear opinion, both within the public and the political decision makers. The antinuclear lobbying in Finland is rather low key. There has been no big demonstrations as the ordinary people do not participate in them. The nuclear opponents have, however, a well working and sympathy arousing organization within the political parties and to a limited extend within the media. They also work in a very professional way in the environmental voluntary organizations. The politically, the industry is waiting for positive signals from the Government. The nuclear decision is considered as one of the most important in this respect. the situation is rather complex, but the industry and the utilities are

  13. Decision on the fifth nuclear unit in Finland - 17 years of decision-making

    International Nuclear Information System (INIS)

    Santaholma, Juhani

    1993-01-01

    This paper shows the process of decision making on the fifth nuclear power plants in Finland that took 17 years. The opinion polls show that about 50% of the Finns are opposing the construction of the fifth NPP, 30% are in favour and 20% don't know or have no firm opinion. This situation has lasted for more than two years. The opinion of the Finnish industry and power utilities is, however, that if the decision makers have courage to make positive decision it will not lead to a revolution in Finland. The industry and the utilities have for many years done systematic work with the media, both the press and the electronic. The media debate has been rather low key reporting, but any incidents get a lot of space, especially events at the Russian and Baltic plants near the Finnish borders. There is a constant flow of reporting from Chernobyl and Chelyabinsk and other questionable Russian facilities in the Finnish media. The five Swedish reactors shut-down for repair have been widely reported. It also seems that false reports and articles in the leading international media, press and TV, find their way to Finnish media, as well. In other respects, the media climate in Finland is rather businesslike. It is evident that the sensational TV programmes have an effect on the Finnish nuclear opinion, both within the public and the political decision makers. The antinuclear lobbying in Finland is rather low key. There has been no big demonstrations as the ordinary people do not participate in them. The nuclear opponents have, however, a well working and sympathy arousing organization within the political parties and to a limited extend within the media. They also work in a very professional way in the environmental voluntary organizations. The politically, the industry is waiting for positive signals from the Government. The nuclear decision is considered as one of the most important in this respect. the situation is rather complex, but the industry and the utilities are

  14. Life management plants at nuclear power plants PWR

    International Nuclear Information System (INIS)

    Esteban, G.

    2014-01-01

    Since in 2009 the CSN published the Safety Instruction IS-22 (1) which established the regulatory framework the Spanish nuclear power plants must meet in regard to Life Management, most of Spanish nuclear plants began a process of convergence of their Life Management Plants to practice 10 CFR 54 (2), which is the current standard of Spanish nuclear industry for Ageing Management, either during the design lifetime of the plant, as well as for Long-Term Operation. This article describe how Life Management Plans are being implemented in Spanish PWR NPP. (Author)

  15. Benchmarking Nuclear Power Plants

    International Nuclear Information System (INIS)

    Jakic, I.

    2016-01-01

    One of the main tasks an owner have is to keep its business competitive on the market while delivering its product. Being owner of nuclear power plant bear the same (or even more complex and stern) responsibility due to safety risks and costs. In the past, nuclear power plant managements could (partly) ignore profit or it was simply expected and to some degree assured through the various regulatory processes governing electricity rate design. It is obvious now that, with the deregulation, utility privatization and competitive electricity market, key measure of success used at nuclear power plants must include traditional metrics of successful business (return on investment, earnings and revenue generation) as well as those of plant performance, safety and reliability. In order to analyze business performance of (specific) nuclear power plant, benchmarking, as one of the well-established concept and usual method was used. Domain was conservatively designed, with well-adjusted framework, but results have still limited application due to many differences, gaps and uncertainties. (author).

  16. IGCC power plant integrated to a Finnish pulp and paper mill. IEA Bioenergy. Techno-economic analysis activity

    Energy Technology Data Exchange (ETDEWEB)

    Koljonen, T.; Solantausta, Y. [VTT Energy, Espoo (Finland). New Energy Technologies; Salo, K.; Horvath, A. [Carbona Inc. (Finland)

    1999-11-01

    In Finland, the pulp and paper industry is the largest consumer of energy among the industries and its power demand will increase due to economical and strict environ- mental requirements. The ageing of oil and biomass boilers in Finland also represents a window of opportunity for the introduction of new environmentally sound technology with a high efficiency in power production, e.g., in biomass gasification. This site-specific study describes the technical and economic feasibility of a biomass gasification combined cycle producing heat and power for a typical Finnish pulp and paper mill. The mill produces SC (super calantered) paper 500 000 ADt/a. The paper mill employs sulphate pulp and GW (ground wood) pulp. The capacity of the pulp mill is 400 000 ADt/a (air dry ton/year) of which 120 000 ADt/a is used at the site. The heat demand of the integrate is covered by a recovery boiler and a bark boiler. A condensing steam turbine with two extractions generates electricity for the mill. The aim is to replace an old bark boiler by an IGCC (Integrated Gasification Combined Cycle) to enhance the economy and environmental performance of the power plant. The IGCC feasibility study is conducted for an pulp and paper integrate because of its suitable infrastructure for IGCC and a large amount of wood waste available at the site. For comparison, the feasibility of an IGCC integrated to a pulp mill is also assessed. The IGCC concept described is based on research and development work performed by Carbona, Inc., who acquired the rights for know-how of Enviropower, Inc. The operation and design of the IGCC concept is based on a 20 MWe gas turbine (MW151). The heat of gas turbine exhaust gas is utilised in a HRSG (Heat Recovery Steam Generator) of two pressure levels to generate steam for the pulp and paper mill and the steam turbine. The MCC power plant operates in condensing mode. The total investment cost of the IGCC plant is estimated at FIM 417 million (USD 83.4 million

  17. IGCC power plant integrated to a Finnish pulp and paper mill. IEA Bioenergy. Techno-economic analysis activity

    International Nuclear Information System (INIS)

    Koljonen, T.; Solantausta, Y.

    1999-01-01

    In Finland, the pulp and paper industry is the largest consumer of energy among the industries and its power demand will increase due to economical and strict environ- mental requirements. The ageing of oil and biomass boilers in Finland also represents a window of opportunity for the introduction of new environmentally sound technology with a high efficiency in power production, e.g., in biomass gasification. This site-specific study describes the technical and economic feasibility of a biomass gasification combined cycle producing heat and power for a typical Finnish pulp and paper mill. The mill produces SC (super calantered) paper 500 000 ADt/a. The paper mill employs sulphate pulp and GW (ground wood) pulp. The capacity of the pulp mill is 400 000 ADt/a (air dry ton/year) of which 120 000 ADt/a is used at the site. The heat demand of the integrate is covered by a recovery boiler and a bark boiler. A condensing steam turbine with two extractions generates electricity for the mill. The aim is to replace an old bark boiler by an IGCC (Integrated Gasification Combined Cycle) to enhance the economy and environmental performance of the power plant. The IGCC feasibility study is conducted for an pulp and paper integrate because of its suitable infrastructure for IGCC and a large amount of wood waste available at the site. For comparison, the feasibility of an IGCC integrated to a pulp mill is also assessed. The IGCC concept described is based on research and development work performed by Carbona, Inc., who acquired the rights for know-how of Enviropower, Inc. The operation and design of the IGCC concept is based on a 20 MWe gas turbine (MW151). The heat of gas turbine exhaust gas is utilised in a HRSG (Heat Recovery Steam Generator) of two pressure levels to generate steam for the pulp and paper mill and the steam turbine. The MCC power plant operates in condensing mode. The total investment cost of the IGCC plant is estimated at FIM 417 million (USD 83.4 million

  18. Are atomic power plants saver than nuclear power plants

    International Nuclear Information System (INIS)

    Roeglin, H.C.

    1977-01-01

    It is rather impossible to establish nuclear power plants against the resistance of the population. To prevail over this resistance, a clarification of the citizens-initiatives motives which led to it will be necessary. This is to say: It is quite impossible for our population to understand what really heappens in nuclear power plants. They cannot identify themselves with nuclear power plants and thus feel very uncomfortable. As the total population feels the same way it is prepared for solidarity with the citizens-initiatives even if they believe in the necessity of nuclear power plants. Only an information-policy making transparent the social-psychological reasons of the population for being against nuclear power plants could be able to prevail over the resistance. More information about the technical procedures is not sufficient at all. (orig.) [de

  19. Elecnuc. Nuclear power plants in the world

    International Nuclear Information System (INIS)

    2005-01-01

    This 2005 edition of the Elecnuc booklet summarizes in tables all numerical data relative to the nuclear power plants worldwide. These data come from the PRIS database managed by the IAEA. The following aspects are reviewed: 2004 highlights; main characteristics of reactor types; map of the French nuclear power plants on 2005/01/01; worldwide status of nuclear power plants at the end of 2004; units distributed by countries; nuclear power plants connected to the grid by reactor-type group; nuclear power plants under construction on 2004; evolution of nuclear power plant capacities connected to the grid; first electric generations supplied by a nuclear unit; electrical generation from nuclear power plants by country at the end 2004; performance indicator of PWR units in France; trend of the generation indicator worldwide; 2004 load factor by owners; units connected to the grid by countries at 12/31/2004; status of licence renewal applications in USA; nuclear power plants under construction at 12/31/2004; shutdown reactors; exported nuclear capacity in net MWe; exported and national nuclear capacity connected to the grid; exported nuclear power plants under construction or order; exported and national nuclear capacity under construction or order; recycling of plutonium in LWR; Mox licence plant projects; Appendix - historical development; acronyms, glossary

  20. Organizing nuclear power plant operation

    International Nuclear Information System (INIS)

    Adams, H.W.; Rekittke, K.

    1987-01-01

    With the preliminary culmination in the convoy plants of the high standard of engineered safeguards in German nuclear power plants developed over the past twenty years, the interest of operators has now increasingly turned to problems which had not been in the focus of attention before. One of these problems is the organization of nuclear power plant operation. In order to enlarge the basis of knowledge, which is documented also in the rules published by the Kerntechnischer Ausschuss (Nuclear Technology Committee), the German Federal Minister of the Interior has commissioned a study of the organizational structures of nuclear power plants. The findings of that study are covered in the article. Two representative nuclear power plants in the Federal Republic of Germany were selected for the study, one of them a single-unit plant run by an independent operating company in the form of a private company under German law (GmbH), the other a dual-unit plant operated as a dependent unit of a utility. The two enterprises have different structures of organization. (orig.) [de

  1. Nuclear Power Plants in the World

    International Nuclear Information System (INIS)

    2003-01-01

    The Japan Atomic Industrial Forum (JAIF) used every year to summarize a trend survey on the private nuclear power plants in the world in a shape of the 'Nuclear power plants in the world'. In this report, some data at the end of 2002 was made up on bases of answers on questionnaires from 65 electric power companies and other nuclear organizations in 28 countries and regions around the world by JAIF. This report is comprised of 19 items, and contains generating capacity of the plants; current status of Japan; trends of generating capacity of operating the plants, the plant orders and generating capacity of the plants; world nuclear capacity by reactor type; status of MOX use in the world; location of the plants; the plants in the world; directory of the plants; nuclear fuel cycle facilities; and so forth. (J.P.N.)

  2. Criticality safety calculations for the nuclear waste disposal canisters

    International Nuclear Information System (INIS)

    Anttila, M.

    1996-12-01

    The criticality safety of the copper/iron canisters developed for the final disposal of the Finnish spent fuel has been studied with the MCNP4A code based on the Monte Carlo technique and with the fuel assembly burnup programs CASMO-HEX and CASMO-4. Two rather similar types of spent fuel disposal canisters have been studied. One canister type has been designed for hexagonal VVER-440 fuel assemblies used at the Loviisa nuclear power plant (IVO canister) and the other one for square BWR fuel bundles used at the Olkiluoto nuclear power plant (TVO canister). (10 refs.)

  3. On nuclear power plant uprating

    International Nuclear Information System (INIS)

    Ho, S. Allen; Bailey, James V.; Maginnis, Stephen T.

    2004-01-01

    Power uprating for commercial nuclear power plants has become increasingly attractive because of pragmatic reasons. It provides quick return on investment and competitive financial benefits, while involving low risks regarding plant safety and public objection. This paper briefly discussed nuclear plant uprating guidelines, scope for design basis analysis and engineering evaluation, and presented the Salem nuclear power plant uprating study for illustration purposes. A cost and benefit evaluation of the Salem power uprating was also included. (author)

  4. Plant Design Nuclear Fuel Element Production Capacity Optimization to Support Nuclear Power Plant in Indonesia

    International Nuclear Information System (INIS)

    Bambang Galung Susanto

    2007-01-01

    The optimization production capacity for designing nuclear fuel element fabrication plant in Indonesia to support the nuclear power plant has been done. From calculation and by assuming that nuclear power plant to be built in Indonesia as much as 12 NPP and having capacity each 1000 MW, the optimum capacity for nuclear fuel element fabrication plant is 710 ton UO 2 /year. The optimum capacity production selected, has considered some aspects such as fraction batch (cycle, n = 3), length of cycle (18 months), discharge burn-up value (Bd) 35,000 up 50,000 MWD/ton U, enriched uranium to be used in the NPP (3.22 % to 4.51 %), future market development for fuel element, and the trend of capacity production selected by advances country to built nuclear fuel element fabrication plant type of PWR. (author)

  5. Nuclear security - New challenge to the safety of nuclear power plants

    International Nuclear Information System (INIS)

    Li Ganjie

    2008-01-01

    The safety of nuclear power plants involves two aspects: one is to prevent nuclear accidents resulted from systems and equipments failure or human errors; the other is to refrain nuclear accidents from external intended attack. From this point of view, nuclear security is an organic part of the nuclear safety of power plants since they have basically the same goals and concrete measures with each other. In order to prevent malicious attacks; the concept of physical protection of nuclear facilities has been put forward. In many years, a series of codes and regulations as well as technical standard systems on physical protection had been developed at international level. The United Nations passed No. 1540 resolution as well as 'Convention on the Suppression of Acts of Nuclear terrorism', and revised 'Convention on Physical Protection of Nuclear Materials', which has enhanced a higher level capacity of preparedness by international community to deal with security issues of nuclear facilities. In China, in order to improve the capability of nuclear power plants on preventing and suppressing the external attacks, the Chinese government consecutively developed the related codes and standards as well as technical documents based on the existing laws and regulations, including 'Guide for the Nuclear Security of Nuclear Power Plants' and 'Guide for the Physical Protection of Nuclear Materials', so as to upgrade the legislative requirements for nuclear security in power plants. The government also made greater efforts to support the scientific research and staff training on physical protection, and satisfying the physical protection standards for newly-built nuclear facilities such as large scale nuclear power plants to meet requirement at international level. At the same time old facilities were renovated and the Chinese government established a nuclear emergency preparedness coordination mechanism, developed corresponding emergency preparedness plans, intensified the

  6. Nuclear power plant pressure vessels. Control of piping

    International Nuclear Information System (INIS)

    2000-01-01

    The guide presents requirements for the pipework of nuclear facilities in Finland. According to the section 117 of the Finnish Nuclear Energy Degree (161/88), the Radiation and Nuclear Safety Authority of Finland (STUK) controls the pressure vessels of nuclear facilities in accordance with the Nuclear Energy Act (990/87) and, to the extent applicable in accordance with the Act of Pressure Vessels (98/73) and the rules and regulations issued by the virtue of these. In addition STUK is an inspecting authority of pressure vessels of nuclear facilities in accordance with the Pressure Vessel Degree (549/1973). According to the section of the Pressure Vessel Degree, a pressure vessel is a steam boiler, pressure container, pipework of other such appliance in which the pressure is above or may come to exceed the atmospheric pressure. Guide YVL 3.0 describes in general terms how STUK controls pressure vessels. STUK controls Safety Class 1, 2 and 3 piping as well as Class EYT (non-nuclear) and their support structures in accordance with this guide and applies the provisions of the Decision of the Ministry of Trade and Industry on piping (71/1975) issued by virtue of the Pressure Vessel Decree

  7. Nuclear power plants in the world

    International Nuclear Information System (INIS)

    2008-01-01

    The Japan Atomic Industrial Forum, Inc. (JAIF) used every year to summarize a trend survey on the private nuclear power plants in the world in a shape of the 'Nuclear power plants in the world'. In this report, some data at the end of 2007/2008 was made up on bases of answers on questionnaires from electric power companies and other nuclear organizations around the world by JAIF. This report is comprised of 18 items, and contains generating capacity of the plants; effect of the Niigata-ken chuetsu-oki earthquake; current status of Japan; trends of generating capacity of operating the plants, the plant orders and generating capacity of the plants; world nuclear capacity by reactor type; status of MOX use in the world; location of the plants; the plants in the world; directory of the plants; nuclear fuel cycle facilities, and so forth. (J.P.N.)

  8. Nuclear Power Plants in the World

    International Nuclear Information System (INIS)

    2004-01-01

    The Japan Atomic Industrial Forum, Inc. (JAIF) used every year to summarize a trend survey on the private nuclear power plants in the world in a shape of the 'Nuclear power plants in the world'. In this report, some data at the end of 2003 was made up on bases of answers on questionnaires from 81 electric power companies and other nuclear organizations in 33 countries and regions around the world by JAIF. This report is comprised of 19 items, and contains generating capacity of the plants; current status of Japan; trends of generating capacity of operating the plants, the plant orders and generating capacity of the plants; world nuclear capacity by reactor type; status of MOX use in the world; location of the plants; the plants in the world; directory of the plants; nuclear fuel cycle facilities; and so forth. (J.P.N.)

  9. Application of Solar Chimney Concept to Solve Potential Safety Issues of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Khasawneh, Khalid; PARK, Youn Won

    2014-01-01

    In this paper two main events and their causes have been investigated and a potential alternative supporting system will be provided. The first event to be addressed is the Station Blackout (SBO) caused by the inherent unreliability of the Emergency Diesel Generators (EDGs) and Alternative AC (AAC) power sources. Different parameters affect The EDG unreliability; for instance, mechanical, operational, maintenance and surveillance. Those parameters will be analyzed and linked to plant safety and Core Damage Frequency (CDF). Also the AACs, the SBO diesel generators, will be studied and their operational requirements similarity with the EDGs will be discussed. The second event to be addressed is the Loss of Ultimate Heat Sink (LUHS) caused by the degradation of heat exchange effectiveness, that is, the poor heat transfer to the Ultimate Heat Sink (UHS). Different causes to such case were observed; intake lines blockages due to ice and foreign biological matters formation and oil spill near the heat sink causing the oil leakage to the heat exchangers tubes. The later cause, oil spill, has been given a special attention here due its potential effects for different nuclear power plants (NPPs) around the world; for example, Finland and the United Arab Emirates (UAE). For the Finnish case, the Finnish nuclear regulator (STUK) took already countermeasures for such scenario by introducing alternative heat sink, cooling towers, for the primary used heat sink, sea water, for one of its nuclear power plants. The abundance of the solar irradiation in the UAE region provides a perfect condition for the implementation of solar power applications. Utilizing this unique characteristic of that region may provide promising alternative and diverse options for solving potential safety related issues of their NPPs. The Solar Chimney Power Plant (SCPP) could be employed to serve as a supporting system to provide emergency power, in the case of SBO, and emergency cooling, in the case of

  10. Application of Solar Chimney Concept to Solve Potential Safety Issues of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Khasawneh, Khalid; PARK, Youn Won [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2014-10-15

    In this paper two main events and their causes have been investigated and a potential alternative supporting system will be provided. The first event to be addressed is the Station Blackout (SBO) caused by the inherent unreliability of the Emergency Diesel Generators (EDGs) and Alternative AC (AAC) power sources. Different parameters affect The EDG unreliability; for instance, mechanical, operational, maintenance and surveillance. Those parameters will be analyzed and linked to plant safety and Core Damage Frequency (CDF). Also the AACs, the SBO diesel generators, will be studied and their operational requirements similarity with the EDGs will be discussed. The second event to be addressed is the Loss of Ultimate Heat Sink (LUHS) caused by the degradation of heat exchange effectiveness, that is, the poor heat transfer to the Ultimate Heat Sink (UHS). Different causes to such case were observed; intake lines blockages due to ice and foreign biological matters formation and oil spill near the heat sink causing the oil leakage to the heat exchangers tubes. The later cause, oil spill, has been given a special attention here due its potential effects for different nuclear power plants (NPPs) around the world; for example, Finland and the United Arab Emirates (UAE). For the Finnish case, the Finnish nuclear regulator (STUK) took already countermeasures for such scenario by introducing alternative heat sink, cooling towers, for the primary used heat sink, sea water, for one of its nuclear power plants. The abundance of the solar irradiation in the UAE region provides a perfect condition for the implementation of solar power applications. Utilizing this unique characteristic of that region may provide promising alternative and diverse options for solving potential safety related issues of their NPPs. The Solar Chimney Power Plant (SCPP) could be employed to serve as a supporting system to provide emergency power, in the case of SBO, and emergency cooling, in the case of

  11. Nuclear Power Plants (Rev.)

    Energy Technology Data Exchange (ETDEWEB)

    Lyerly, Ray L.; Mitchell III, Walter [Southern Nuclear Engineering, Inc.

    1973-01-01

    Projected energy requirements for the future suggest that we must employ atomic energy to generate electric power or face depletion of our fossil-fuel resources—coal, oil, and gas. In short, both conservation and economic considerations will require us to use nuclear energy to generate the electricity that supports our civilization. Until we reach the time when nuclear power plants are as common as fossil-fueled or hydroelectric plants, many people will wonder how the nuclear plants work, how much they cost, where they are located, and what kinds of reactors they use. The purpose of this booklet is to answer these questions. In doing so, it will consider only central station plants, which are those that provide electric power for established utility systems.

  12. Examination of some assumed severe reactor accidents at the Olkiluoto nuclear power plant

    International Nuclear Information System (INIS)

    Pekkarinen, E.; Rossi, J.

    1989-02-01

    Knowledge and analysis methods of severe accidents at nuclear power plants and of subsequent response of primary system and containment have been developed in last few years to the extent that realistic source tems of the specified accident sequences can be calculated for the Finnish nuclear power plants. The objective of this investigation was to calculate the source terms of off-site consequences brought about by some selected severe accident sequences initiated by the total loss of on-site and off-site AC power at the Olkiluoto nuclear power plant. The results describing the estimated off-site health risks are expressed as conditional assuming that the accident has taken place, because the probabilities of the occurence of the accident sequences considered have not been analysed in this study. The range and probabilities of occurence of health detriments are considered by calculating consequences in different weeather conditions and taking into account the annual frequency of each weather condition and statistical population distribution. The calculational results indicate that the reactor building provides and additional holdup and deposition of radioactive substance (except coble gases) released from the containment. Furthermore, the release fractions of the core inventory to the environment of volatile fission products such as iodine, cesium and tellurium remain under 0.03. No early health effects are predicted for the surrounding population in case the assumed short-tem countermeasures are performed effectively. Acute health effects are extremely improbable even without any active countermeasure. By reducing the long-term exposure from contaminated agricultural products, the collective dose from natural long-term background radiation, for instance in the sector of 30 degrees towards the southern Finland up to the distance of 300 kilometers, would be expected to increase with 2-20 percent depending on the release considered

  13. Improvement of the nuclear plant analyzer for Korean Standard Nuclear Power Plants

    International Nuclear Information System (INIS)

    Choi, Sung Soo; Han, Byoung Sub; Suh, Jae Seung; Son, Dae Seong

    2005-04-01

    Accurate analysis of the operating characteristics of Nuclear Power Plants provides valuable information for both norman and abnormal operation. The information can be used for the enhancement of plant performance and safety. Usually, such analysis is performed using computer codes used for plant design or simulators. However, their usages are limited because special expertise is required to use the computer codes and simulators are not portable. Therefore, it deemed necessary to develop an NPA which minimizes those limitations and can be used for the analysis and simulation of Nuclear Power Plants. The purpose of this study is to develop a real-time best-estimate NPA for the Korean Nuclear Power Plants(KSNP). The NPA is an interactive, high fidelity engineering simulator. NPA combines the process model simulating the plant behavior with the latest computer technology such as Graphical User Interface(GUI) and simulation executive for enhanced user interface. The process model includes models for a three-dimensional reactor core, the NSSS, secondary system including turbine and feedtrain, safety auxiliary systems, and various control systems. Through the verification and validation of the NPA, it was demonstrated that the NPA can realistically simulate the plant behaviors during transient and accident conditions

  14. Nuclear power plants in post-war thought

    International Nuclear Information System (INIS)

    Toya, Hiroshi

    2015-01-01

    This paper overviews how nuclear power plants have been talked about in the post-war thought. Science and technology sometimes significantly change the thinking way of humans, and nuclear power generation is an extreme technology. This paper overviews how nuclear power plants and humans are correlated. The following three points are discussed as the major issues of contemporary thought over nuclear power plants. First, on the danger of nuclear power plants, the risk of destructive power that nuclear energy has, and the danger of unreasoning development in science and technology civilization are discussed. Second, on the ethics issues surrounding nuclear power plants, the ethics that are based on unbalanced power relations, and democratic responsibility ethics based on discussion ethics are discussed. Third, on the issues of nuclear power plants and imagination, the limitations of democratic discussion surrounding nuclear power plants, the formation of imagination commensurate with the destructive power of nuclear power plants, and the formation of imagination that can represent the distant future are discussed. (A.O.)

  15. Public regulation of nuclear plants

    International Nuclear Information System (INIS)

    Burtheret, M.; Cormis, de

    1980-01-01

    The construction and operation of nuclear plants are subject to a complex system of governmental administration. The authors list the various governmental authorisations and rules applicable to these plants. In the first part, they describe the national regulations which relate specifically to nuclear plants, and emphasize the provisions which are intended to ensure the safety of the installations and the protection of the public against ionizing radiation. However, while the safety of nuclear plants is a major concern of the authorities, other interests are also protected. This is accomplished by various laws or regulations which apply to nuclear plants as well as other industrial installations. The duties which these texts, and the administrative practice based thereon, impose on Electricite de France are covered in the second part [fr

  16. Regulatory oversight of nuclear safety in Finland. Annual report 2011

    Energy Technology Data Exchange (ETDEWEB)

    Kainulainen, E. (ed.)

    2012-07-01

    The report constitutes the report on regulatory control in the field of nuclear energy which the Radiation and Nuclear Safety Authority (STUK) is required to submit once a year to the Ministry of Employment and the Economy pursuant to Section 121 of the Nuclear Energy Decree. The report is also delivered to the Ministry of Environment, the Finnish Environment Institute, and the regional environmental authorities of the localities in which a nuclear facility is located. The regulatory control of nuclear safety in 2011 included the design, construction and operation of nuclear facilities, as well as nuclear waste management and nuclear materials. The first parts of the report explain the basics of nuclear safety regulation included as part of STUK's responsibilities, as well as the objectives of the operations, and briefly introduce the objects of regulation. The chapter concerning the development and implementation of legislation and regulations describes changes in nuclear legislation, as well as the progress of STUK's YVL Guide revision work. The section concerning the regulation of nuclear facilities contains an overall safety assessment of the nuclear facilities currently in operation or under construction. The chapter concerning the regulation of the final disposal project for spent nuclear fuel de-scribes the preparations for the final disposal project and the related regulatory activities. The section concerning nuclear non-proliferation describes the nuclear non-proliferation control for Finnish nuclear facilities and final disposal of spent nuclear fuel, as well as measures required by the Additional Protocol of the Safeguards Agreement. The chapter describing the oversight of security arrangements in the use of nuclear energy discusses oversight of the security arrangements in nuclear power plants and other plants, institutions and functions included within the scope of STUK's regulatory oversight. The chapter also discusses the national and

  17. Nuclear Power Plants in the World

    International Nuclear Information System (INIS)

    2000-01-01

    The Japan Atomic Industrial Forum (JAIF) used every year to summarize a trend survey on the private nuclear power plants in the world in a shape of the 'Developmental trends on nuclear power plants in the world'. In this report, some data at the end of 1999 was made up on bases of answers on questionnaires from 72 electric companies in 31 nations and regions in the world by JAIF. This report is comprised of 19 items, and contains generating capacity of the plants; current status of Japan; trends of generating capacity of operating the plants, the plant orders and generating capacity of the plants; world nuclear capacity by reactor type; location of the plants; the plants in the world; and so forth. And, it also has some survey results on the 'Liberalization of electric power markets and nuclear power generation' such as some 70% of respondents in nuclear power for future option, gas-thermal power seen as power source with most to gain from liberalization, merits on nuclear power generation (environmental considerations and supply stability), most commonly voiced concern about new plant orders in poor economy, and so forth. (G.K.)

  18. Nuclear power plant safety

    International Nuclear Information System (INIS)

    Otway, H.J.

    1974-01-01

    Action at the international level will assume greater importance as the number of nuclear power plants increases, especially in the more densely populated parts of the world. Predictions of growth made prior to October 1973 [9] indicated that, by 1980, 14% of the electricity would be supplied by nuclear plants and by the year 2000 this figure would be about 50%. This will make the topic of international co-operation and standards of even greater importance. The IAEA has long been active in providing assistance to Member States in the siting design and operation of nuclear reactors. These activities have been pursued through advisory missions, the publication of codes of practice, guide books, technical reports and in arranging meetings to promote information exchange. During the early development of nuclear power, there was no well-established body of experience which would allow formulation of internationally acceptable safety criteria, except in a few special cases. Hence, nuclear power plant safety and reliability matters often received an ad hoc approach which necessarily entailed a lack of consistency in the criteria used and in the levels of safety required. It is clear that the continuation of an ad hoc approach to safety will prove inadequate in the context of a world-wide nuclear power industry, and the international trade which this implies. As in several other fields, the establishment of internationally acceptable safety standards and appropriate guides for use by regulatory bodies, utilities, designers and constructors, is becoming a necessity. The IAEA is presently planning the development of a comprehensive set of basic requirements for nuclear power plant safety, and the associated reliability requirements, which would be internationally acceptable, and could serve as a standard frame of reference for nuclear plant safety and reliability analyses

  19. Summary of nuclear power plant construction

    International Nuclear Information System (INIS)

    Tamura, Saburo

    1973-01-01

    Various conditions for the construction of nuclear power plants in Japan without natural resources were investigated. Expansion of the sites of plants, change of reactor vessels, standardization of nuclear power plants, possiblity of the reduction of construction period, approaching of nuclear power plants to consuming cities, and group construction were studied. Evaluation points were safety and economy. Previous sites of nuclear power plants were mostly on plane ground or cut and enlarge sites. Proposals for underground or offshore plants have been made. The underground plants were made at several places in Europe, and the ocean plant is now approved in U.S.A. as a plant on a man-made island. Vessels for containing nuclear reactors are the last barriers to the leakage of radioactive substance. At the initial period, the vessels were made of steel, which were surrounded by shielding material. Those were dry well type containers. Then, vessel type changed to pressure-suppression type wet containers. Now, it tends to concrete (PC or RC) type containers. There is the policy on the standardization of nuclear power plants by U.S.A.E.C. in recent remarkable activity. The merit and effect of the standardization were studied, and are presented in this paper. Cost of the construction of nuclear power plants is expensive, and interest of money is large. Then, the reduction of construction period is an important problem. The situations of plants approaching to consuming cities in various countries were studied. Idea of group construction is described. (Kato, T.)

  20. Main messages for the new nuclear unit in Finland

    International Nuclear Information System (INIS)

    Nikula, Anneli

    2001-01-01

    Teollisuuden Voima Oy (TVO) submitted last year, on 15th November, to the Council of State an application for a decision in principle concerning the construction of additional nuclear capacity. In this presentation, the main messages to decision makers for the new unit are discussed. Also the studies, which the messages are based on, are described. According to the Finnish Nuclear Energy Act, a company considering a nuclear plant project must apply for a decision in principle from the Government beforehand. The Government then decides whether the project is in accordance with the overall good of the society. If the decision is positive, it needs ratification by the Parliament. Before the Government decision, various interested parties are heard, including the municipality of location and the Radiation and Nuclear Safety Authority. The phase of statements is underway and they all will be ready by the end of March 2001. The entire application process takes approximately 1-2 years. The main messages arguing for more nuclear power in Finland were as follows. The new nuclear power plant unit replaces old fossil power plants and satisfies the need for additional demand of electricity; makes possible to meet the requirements of the Kyoto agreement; reduces the dependence on the imported energy and assures a stable and predictable electricity price. Messaging concerning a new nuclear power plant unit is made in co-operation with several organisations. The most important of them, in addition to the company shareholders, are the companies which have shown interested in the new project as well as the Finnish Energy Industries Federation (Finergy) and the Confederation of Finnish Industry and Employers. A transparency folder 'Nuclear electricity 2000' was put together of the messages in collaboration with the organisations. The folder was distributed to about 400 opinion leaders in the energy field. To ensure the consistency of the messages, several interest group meetings

  1. Elecnuc. Nuclear power plants in the world

    International Nuclear Information System (INIS)

    1998-01-01

    This small booklet summarizes in tables all the numerical data relative to the nuclear power plants worldwide. These data come from the French CEA/DSE/SEE Elecnuc database. The following aspects are reviewed: 1997 highlights; main characteristics of the reactor types in operation, under construction or on order; map of the French nuclear power plants; worldwide status of nuclear power plants at the end of 1997; nuclear power plants in operation, under construction and on order; capacity of nuclear power plants in operation; net and gross capacity of nuclear power plants on the grid and in commercial operation; forecasts; first power generation of nuclear origin per country, achieved or expected; performance indicator of PWR units in France; worldwide trend of the power generation indicator; nuclear power plants in operation, under construction, on order, planned, cancelled, shutdown, and exported; planning of steam generators replacement; MOX fuel program for plutonium recycling. (J.S.)

  2. Nuclear power plant diagnostic system

    International Nuclear Information System (INIS)

    Prokop, K.; Volavy, J.

    1982-01-01

    Basic information is presented on diagnostic systems used at nuclear power plants with PWR reactors. They include systems used at the Novovoronezh nuclear power plant in the USSR, at the Nord power plant in the GDR, the system developed at the Hungarian VEIKI institute, the system used at the V-1 nuclear power plant at Jaslovske Bohunice in Czechoslovakia and systems of the Rockwell International company used in US nuclear power plants. These diagnostic systems are basically founded on monitoring vibrations and noise, loose parts, pressure pulsations, neutron noise, coolant leaks and acoustic emissions. The Rockwell International system represents a complex unit whose advantage is the on-line evaluation of signals which gives certain instructions for the given situation directly to the operator. The other described systems process signals using similar methods. Digitized signals only serve off-line computer analyses. (Z.M.)

  3. KWU Nuclear Plant Analyzer

    International Nuclear Information System (INIS)

    Bennewitz, F.; Hummel, R.; Oelmann, K.

    1986-01-01

    The KWU Nuclear Plant Analyzer is a real time engineering simulator based on the KWU computer programs used in plant transient analysis and licensing. The primary goal is to promote the understanding of the technical and physical processes of a nuclear power plant at an on-site training facility. Thus the KWU Nuclear Plant Analyzer is available with comparable low costs right at the time when technical questions or training needs arise. This has been achieved by (1) application of the transient code NLOOP; (2) unrestricted operator interaction including all simulator functions; (3) using the mainframe computer Control Data Cyber 176 in the KWU computing center; (4) four color graphic displays controlled by a dedicated graphic computer, no control room equipment; and (5) coupling of computers by telecommunication via telephone

  4. Systematic analysis and prevention of human originated common cause failures in relation to maintenance activities at Finnish nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Laakso, K. [VTT Industrial Systems, Espoo (Finland)

    2006-12-15

    The focus in human reliability analysis of nuclear power plants has traditionally been on human performance in disturbance conditions. On the other hand, human maintenance failures and design deficiencies, remained latent in the system, have an impact on the severity of a disturbance, e.g. by disabling safety-related equipment on demand. Especially common cause failures (CCFs) of safety related systems can affect the core damage risk to a significant extent. The topic has been addressed in Finnish studies, where experiences of latent human errors have been searched and analysed systematically from the maintenance history stored in the the power plant information systems of the Loviisa and Olkiluoto NPPs. Both the single and multiple errors (CCFs) were classified in detail and documented as error and event reports. The human CCFs involved human, organisational and technical factors. The review of the analysed single and multiple errors showed that instrumentation and control and electrical equipment are more prone to human error caused failure events than the other maintenance objects. The review of the analysed experience showed that most errors stem from the refuelling and maintenance outage periods. More than half of the multiple errors from the outages remained latent to the power operating periods. The review of the analysed multiple errors showed that difficulties with small plant modifications and planning of maintenance and operability were significant sources of common cause failures. The most dependent human errors originating from small modifications could be reduced by a more tailored planning and coverage of their start-up testing programs. Improvements could also be achieved by identifying better in work planning from the operating experiences those complex or intrusive repair and preventive maintenance work tasks and actions which are prone to errors. Such uncertain cases in important equipment require a more tailored work planning of the installation

  5. Systematic analysis and prevention of human originated common cause failures in relation to maintenance activities at Finnish nuclear power plants

    International Nuclear Information System (INIS)

    Laakso, K.

    2006-12-01

    The focus in human reliability analysis of nuclear power plants has traditionally been on human performance in disturbance conditions. On the other hand, human maintenance failures and design deficiencies, remained latent in the system, have an impact on the severity of a disturbance, e.g. by disabling safety-related equipment on demand. Especially common cause failures (CCFs) of safety related systems can affect the core damage risk to a significant extent. The topic has been addressed in Finnish studies, where experiences of latent human errors have been searched and analysed systematically from the maintenance history stored in the the power plant information systems of the Loviisa and Olkiluoto NPPs. Both the single and multiple errors (CCFs) were classified in detail and documented as error and event reports. The human CCFs involved human, organisational and technical factors. The review of the analysed single and multiple errors showed that instrumentation and control and electrical equipment are more prone to human error caused failure events than the other maintenance objects. The review of the analysed experience showed that most errors stem from the refuelling and maintenance outage periods. More than half of the multiple errors from the outages remained latent to the power operating periods. The review of the analysed multiple errors showed that difficulties with small plant modifications and planning of maintenance and operability were significant sources of common cause failures. The most dependent human errors originating from small modifications could be reduced by a more tailored planning and coverage of their start-up testing programs. Improvements could also be achieved by identifying better in work planning from the operating experiences those complex or intrusive repair and preventive maintenance work tasks and actions which are prone to errors. Such uncertain cases in important equipment require a more tailored work planning of the installation

  6. Nuclear accidents and safety measures of domestic nuclear power plants

    International Nuclear Information System (INIS)

    Song Zurong; Che Shuwei; Pan Xiang

    2012-01-01

    Based on the design standards for the safety of nuclear and radiation in nuclear power plants, the three accidents in the history of nuclear power are analyzed. And the main factors for these accidents are found out, that is, human factors and unpredicted natural calamity. By combining the design and operation parameters of domestic nuclear plants, the same accidents are studied and some necessary preventive schemes are put forward. In the security operation technology of domestic nuclear power plants nowadays, accidents caused by human factors can by prevented completely. But the safety standards have to be reconsidered for the unpredicted neutral disasters. How to reduce the hazard of nuclear radiation and leakage to the level that can be accepted by the government and public when accidents occur under extreme conditions during construction and operation of nuclear power plants must be considered adequately. (authors)

  7. Perspectives of nuclear power plants

    International Nuclear Information System (INIS)

    Vajda, Gy.

    2001-01-01

    In several countries the construction of nuclear power plants has been stopped, and in some counties several plants have been decommissioned or are planned to. Therefore, the question arises: have nuclear power plants any future? According to the author, the question should be reformulated: can mankind survive without nuclear power? To examine this challenge, the global power demand and its trends are analyzed. According to the results, traditional energy sources cannot be adequate to supply power. Therefore, a reconsideration of nuclear power should be imminent. The economic, environmental attractions are discussed as opposite to the lack of social support. (R.P.)

  8. Off-shore nuclear power plant

    International Nuclear Information System (INIS)

    Nakanishi, T.

    1980-01-01

    In order to avoid losses of energy and seawater pollution an off-shore nuclear power plant is coupled with a power plant which utilizes the temperature difference between seawater and hot reactor cooling water. According to the invention the power plant has a working media loop which is separated from the nuclear power plant. The apparative equipment and the operational characteristics of the power plant are the subject of the patent. (UWI) [de

  9. Plant life management optimized utilization of existing nuclear power plants

    International Nuclear Information System (INIS)

    Watzinger, H.; Erve, M.

    1999-01-01

    For safe, reliable and economical nuclear power generation it is of central importance to understand, analyze and manage aging-related phenomena and to apply this information in the systematic utilization and as-necessary extension of the service life of components and systems. An operator's overall approach to aging and plant life management which also improves performance characteristics can help to optimize plant operating economy. In view of the deregulation of the power generation industry with its increased competition, nuclear power plants must today also increasingly provide for or maintain a high level of plant availability and low power generating costs. This is a difficult challenge even for the newest, most modern plants, and as plants age they can only remain competitive if a plant operator adopts a strategic approach which takes into account the various aging-related effects on a plant-wide basis. The significance of aging and plant life management for nuclear power plants becomes apparent when looking at their age: By the year 2000 roughly fifty of the world's 434 commercial nuclear power plants will have been in operation for thirty years or more. According to the International Atomic Energy Agency, as many as 110 plants will have reached the thirty-year service mark by the year 2005. In many countries human society does not push the construction of new nuclear power plants and presumably will not change mind within the next ten years. New construction licenses cannot be expected so that for economical and ecological reasons existing plants have to be operated unchallengeably. On the other hand the deregulation of the power production market is asking just now for analysis of plant life time to operate the plants at a high technical and economical level until new nuclear power plants can be licensed and constructed. (author)

  10. Finnish support programme to IAEA safeguards. Annual report 1994; Suomen tukiohjelma IAEA:n safeguards-valvonnalle. Vuoden 1994 toimintakertomus

    Energy Technology Data Exchange (ETDEWEB)

    Tarvainen, M [ed.

    1995-05-01

    Implementation of the Finnish Support Programme to IAEA Safeguards (FINSP) during the calender year in question is summarized. FINSP is carried out trough separate tasks concentrating on verification of nuclear material, training and expert services to the IAEA. In addition to the Finnish summary, the report includes detailed description of each task in English.

  11. Building of nuclear power plant

    International Nuclear Information System (INIS)

    Saito, Takashi.

    1997-01-01

    A first nuclear plant and a second nuclear power plant are disposed in adjacent with each other in a building for a nuclear reactor. A reactor container is disposed in each of the plants, and each reactor container is surrounded by a second containing facility. A repairing chamber capable of communicating with the secondary containing facilities for both of the secondary containing facilities is disposed being in contact with the second containing facility of each plant for repairing control rod driving mechanisms or reactor incorporated-type recycling pumps. Namely, the repairing chamber is in adjacent with the reactor containers of both plants, and situated between both of the plants as a repairing chamber to be used in common for both plants. Air tight inlet/exit doors are formed to the inlets/exits of both plants of the repairing chamber. Space for the repairing chamber can be reduced to about one half compared with a case where the repairing chamber is formed independently on each plant. (I.N.)

  12. Nuclear Power Plants. Revised.

    Science.gov (United States)

    Lyerly, Ray L.; Mitchell, Walter, III

    This publication is one of a series of information booklets for the general public published by the United States Atomic Energy Commission. Among the topics discussed are: Why Use Nuclear Power?; From Atoms to Electricity; Reactor Types; Typical Plant Design Features; The Cost of Nuclear Power; Plants in the United States; Developments in Foreign…

  13. 75 FR 66802 - Calvert Cliffs Nuclear Power Plant, LLC; Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2...

    Science.gov (United States)

    2010-10-29

    ... Nuclear Power Plant, LLC; Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2; Notice of Withdrawal of...) has granted the request of Calvert Cliffs Nuclear Power Plant, LLC, the licensee, to withdraw its... for the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, located in Calvert County, MD. The...

  14. Electromagnetic compatibility of nuclear power plants

    International Nuclear Information System (INIS)

    Cabayan, H.S.

    1983-01-01

    Lately, there has been a mounting concern about the electromagnetic compatibility of nuclear-power-plant systems mainly because of the effects due to the nuclear electromagnetic pulse, and also because of the introduction of more-sophisticated and, therefore, more-susceptible solid-state devices into the plants. Questions have been raised about the adequacy of solid-state-device protection against plant electromagnetic-interference sources and transients due to the nuclear electromagnetic pulse. In this paper, the author briefly reviews the environment, and the coupling, susceptibility, and vulnerability assessment issues of commercial nuclear power plants

  15. Nuclear power plants in populated areas

    International Nuclear Information System (INIS)

    Wachsmann, F.

    1973-01-01

    The article first deals with the permanently increasing demand for electical power. Considering the ever growing energy demand which can no longer be covered by conventional power plants, it has become necessary to set up nuclear power plants of larger range. The author presents in a survey the basic function of nuclear power plants as well as the resulting risks and safety measures. The author concludes that according to present knowledge there is no more need to erect nuclear power plants outside densely populated urban areas but there is now the possibility of erecting nuclear power plants in densely populated areas. (orig./LH) [de

  16. RETU The Finnish research programme on reactor safety 1995-1998. Final Symposium

    International Nuclear Information System (INIS)

    Vanttola, T.

    1998-01-01

    The Reactor Safety (RETU, 1995-1998) research programme concentrated on search of safe limits for nuclear fuel and the reactor core, accident management methods and risk management of nuclear power plants. The total volume of the programme was 100 person years and funding FIM 58 million. This symposium report summarises the research fields, the objectives and the main results obtained. In the field of operational margins of a nuclear reactor, the behaviour of high burnup nuclear fuel was studied both in normal operation and during power transients. The static and dynamic reactor analysis codes were developed and validated to cope with new fuel designs and complicated three-dimensional reactivity transients. Advanced flow models and numerical solution methods for the dynamics codes were developed and tested. Research on accident management developed and validated calculation methods needed to plan preventive measures and to train the personnel to severe accident mitigation. Efforts were made to reduce uncertainties in phenomena important in severe accidents and to study actions planned for accident management. The programme included experimental work, but also participation in large international tests. The Finnish thermal-hydraulic test facility PACTEL was used extensively for the evaluation of the VVER-440 plant accident behaviour, for the validation of the accident analysis computer codes and for the testing of passive safety system concepts for future plant designs. In risk management probabilistic methods were developed for safety related decision making and for complex event sequences. Effects of maintenance on safety were studied and effective methods for assessment of human reliability and safety critical organisations were searched. To enhance human competencies in control of complex environments, practical tools for training and continuous learning were worked out, and methods to evaluate appropriateness of control room design were developed. (orig)

  17. Nuclear Security for Floating Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Skiba, James M. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Scherer, Carolynn P. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-10-13

    Recently there has been a lot of interest in small modular reactors. A specific type of these small modular reactors (SMR,) are marine based power plants called floating nuclear power plants (FNPP). These FNPPs are typically built by countries with extensive knowledge of nuclear energy, such as Russia, France, China and the US. These FNPPs are built in one country and then sent to countries in need of power and/or seawater desalination. Fifteen countries have expressed interest in acquiring such power stations. Some designs for such power stations are briefly summarized. Several different avenues for cooperation in FNPP technology are proposed, including IAEA nuclear security (i.e. safeguards), multilateral or bilateral agreements, and working with Russian design that incorporates nuclear safeguards for IAEA inspections in non-nuclear weapons states

  18. Nuclear power plants in the world - 2010 edition

    International Nuclear Information System (INIS)

    2010-01-01

    This small booklet summarizes in tables all data relative to the nuclear power plants worldwide. These data come from the IAEA's PRIS and AREVA-CEA's GAIA databases. The following aspects are reviewed: 2009 highlights, Main characteristics of reactor types, Map of the French nuclear power plants on 2010/01/01, Worldwide status of nuclear power plants (12/31/2009), Units distributed by countries, Nuclear power plants connected to the Grid- by reactor type groups, Nuclear power plants under construction on 2009, Evolution of nuclear power plants capacities connected to the grid, First electric generations supplied by a nuclear unit in each country, Electrical generation from nuclear power plants by country at the end 2009, Performance indicator of french PWR units, Evolution of the generation indicators worldwide by type, Nuclear operator ranking according to their installed capacity, Units connected to the grid by countries at 12/31/2009, Status of licence renewal applications in USA, Nuclear power plants under construction at 12/31/2009, Shutdown reactors, Exported nuclear capacity in net MWe, Exported and national nuclear capacity connected to the grid, Exported nuclear power plants under construction, Exported and national nuclear capacity under construction, Nuclear power plants ordered at 12/31/2009, Long term shutdown units at 12/31/2009, COL applications in the USA, Recycling of Plutonium in reactors and experiences, Mox licence plants projects, Appendix - historical development, Meaning of the used acronyms, Glossary

  19. Nuclear plant life - A business decision

    International Nuclear Information System (INIS)

    Joosten, J.K.

    1995-01-01

    Regarding the future of the nuclear power option, many scenarios have been put forth over the years. The most commonly accepted projections for installed nuclear capacity show it growing at a rate of about 2% per year throughout the next few decades. These projections appear modes on the surface. However, underlying the projections are critical assumptions and sometimes misconceptions about the lifetimes of existing reactors and how they are determined. The notion of a 40 year plant life is very common. Consequently, many projections start either with the assumption that no plants will be retired in the near terms or with the assumption that each retired plant will be replaced by another nuclear plant after 40 years. Effectively, these assumptions yield future projections for installed capacity that might be characterized as low growth, medium growth and high growth scenarios - or grow, grow, grow. The question remains as to whether or not these assumptions accurately model the driving forces and constraints to nuclear development. After all, there is no scientific basis for believing that all plants, PWRs BWRs, RBMKs, etc., should have the same 40 year life. Most power plant owners purchase the plant for the main reason of supplying electrical power to their consumer. For these owners, electricity production is a day to day commercial activity with various alternatives on how to achieve the prime objective. The decision of which electricity generation alternative to select (gas, coal, nuclear or renewable energy) and how long to operate the plant before replacing it with a new one is essentially a business decision. The paper discusses ageing, the nuclear plant life decision process, the factors which influence the decision and their ramifications regarding the near term growth of nuclear power capacity. The modelling of nuclear plant lifetimes is also discussed. (author). 5 refs, 10 figs, 1 tab

  20. Pumps for nuclear facilities

    International Nuclear Information System (INIS)

    1999-01-01

    The guide describes how the Finnish Radiation and Nuclear Safety Authority (STUK) controls pumps and their motors at nuclear power plants and other nuclear facilities. The scope of the control is determined by the Safety Class of the pump in question. The various phases of the control are: (1) review of construction plan, (2) control of manufacturing, and construction inspection, (3) commissioning inspection, and (4) control during operation. STUK controls Safety Class 1, 2 and 3 pumps at nuclear facilities as described in this guide. STUK inspects Class EYT (non-nuclear) pumps separately or in connection with the commissioning inspections of the systems. This guide gives the control procedure and related requirements primarily for centrifugal pumps. However, it is also applied to the control of piston pumps and other pump types not mentioned in this guide

  1. Owners of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Hudson, C.R.; White, V.S.

    1996-11-01

    Commercial nuclear power plants in this country can be owned by a number of separate entities, each with varying ownership proportions. Each of these owners may, in turn, have a parent/subsidiary relationship to other companies. In addition, the operator of the plant may be a different entity as well. This report provides a compilation on the owners/operators for all commercial power reactors in the United States. While the utility industry is currently experiencing changes in organizational structure which may affect nuclear plant ownership, the data in this report is current as of July 1996. The report is divided into sections representing different aspects of nuclear plant ownership.

  2. Elecnuc. Nuclear power plants in the world

    International Nuclear Information System (INIS)

    2000-01-01

    This small booklet summarizes in tables all the numerical data relative to the nuclear power plants worldwide. These data come from the French CEA/DSE/SEE Elecnuc database. The following aspects are reviewed: 1999 highlights; main characteristics of the reactor types in operation, under construction or on order; map of the French nuclear power plants; worldwide status of nuclear power plants at the end of 1999; nuclear power plants in operation, under construction and on order; capacity of nuclear power plants in operation; net and gross capacity of nuclear power plants on the grid and in commercial operation; grid connection forecasts; world electric power market; electronuclear owners and share holders in EU, capacity and load factor; first power generation of nuclear origin per country, achieved or expected; performance indicator of PWR units in France; worldwide trend of the power generation indicator; 1999 gross load factor by operator; nuclear power plants in operation, under construction, on order, planned, cancelled, shutdown, and exported; planning of steam generators replacement; MOX fuel program for plutonium recycling. (J.S.)

  3. Advanced plant design recommendations from Cook Nuclear Plant experience

    International Nuclear Information System (INIS)

    Zimmerman, W.L.

    1993-01-01

    A project in the American Electric Power Service Corporation to review operating and maintenance experience at Cook Nuclear Plant to identify recommendations for advanced nuclear plant design is described. Recommendations so gathered in the areas of plant fluid systems, instrument and control, testing and surveillance provisions, plant layout of equipment, provisions to enhance effective maintenance, ventilation systems, radiological protection, and construction, are presented accordingly. An example for a design review checklist for effective plant operations and maintenance is suggested

  4. Elecnuc. Nuclear power plants worldwide

    International Nuclear Information System (INIS)

    1998-01-01

    This small folder presents a digest of some useful information concerning the nuclear power plants worldwide and the situation of nuclear industry at the end of 1997: power production of nuclear origin, distribution of reactor types, number of installed units, evolution and prediction of reactor orders, connections to the grid and decommissioning, worldwide development of nuclear power, evolution of power production of nuclear origin, the installed power per reactor type, market shares and exports of the main nuclear engineering companies, power plants constructions and orders situation, evolution of reactors performances during the last 10 years, know-how and development of nuclear safety, the remarkable facts of 1997, the future of nuclear power and the energy policy trends. (J.S.)

  5. TOSHIBA CAE system for nuclear power plant

    International Nuclear Information System (INIS)

    Machiba, Hiroshi; Sasaki, Norio

    1990-01-01

    TOSHIBA aims to secure safety, increase reliability and improve efficiency through the engineering for nuclear power plant using Computer Aided Engineering (CAE). TOSHIBA CAE system for nuclear power plant consists of numbers of sub-systems which had been integrated centering around the Nuclear Power Plant Engineering Data Base (PDBMS) and covers all stage of engineering for nuclear power plant from project management, design, manufacturing, construction to operating plant service and preventive maintenance as it were 'Plant Life-Cycle CAE System'. In recent years, TOSHIBA has been devoting to extend the system for integrated intelligent CAE system with state-of-the-art computer technologies such as computer graphics and artificial intelligence. This paper shows the outline of CAE system for nuclear power plant in TOSHIBA. (author)

  6. Operation and maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Ackermann, G.

    1987-01-01

    This textbook gives a systematic introduction into the operational and maintenance activities in nuclear power plants with pressurized water reactors. Subjects: (1) Setup and operational behaviour of power reactors, (2) setup of nuclear power plants, (3) radiation protection and nuclear safety, (4) nuclear fuel, (5) constructional layout of nuclear power plants, (6) management, and (7) maintenance. 158 figs., 56 tabs

  7. Decisions on the safety of using nuclear power

    International Nuclear Information System (INIS)

    Janka, P.

    1992-01-01

    A new nuclear energy law came into force in Finland in 1988. This law defines general principles, conditions and requirements concerning the use of nuclear power. The law expects the use of nuclear power to be safe and the safety and contingency systems to be sufficient. General rules for the safety of using nuclear power and for safety arrangements and contingency plans are laid down by the government. The Finnish Centre for Radiation and Nuclear Safety has proposed the various rules to be adopted by the government and come into force by 1991. The rules for the safety of nuclear power plants and final waste storage plants contain limits for emissions of radioactive substances and radiation exposure and requirements for the safety in planning, building and using nuclear power plants and final waste storage plants. They observe international experience and research on risks linked to the use of nuclear power from the last few years as well as means and measures to contain these risks under all conditions. Safety arrangements at nuclear power plants contain measures required to be taken by the owner of the plants to thwart unlawful activities aimed at the plant. Most important of these are the rules for actions to be taken in dangerous situations. The proposed contingency plans contain measures to be taken by the owner of the plants in order to contain nuclear damages resulting from an accident. Most important of these are the rules for planning contingency arrangements, keeping these arrangements operable and actions to be taken in emergency situations. (author)

  8. Analysis of failure and maintenance experiences of motor operated valves in a Finnish nuclear power plant

    International Nuclear Information System (INIS)

    Simola, K.; Laakso, K.

    1992-01-01

    Operating experiences from 1981 up to 1989 of totally 104 motor operated closing valves (MOV) in different safety systems at TVO I and II nuclear power units were analysed in a systematic way. The qualitative methods used were failure mode and effects analysis (FMEA) and maintenance effects and criticality analysis (MECA). The failure descriptions were obtained from power plant's computerized failure reporting system. The reported 181 failure events were reanalysed and sorted according to specific classifications developed for the MOV function. Filled FMEA and MECA sheets on individual valves were stored in a microcomputer data base for further analyses. Analyses were performed for the failed mechanical and electrical valve parts, ways of detection of failure modes, failure effects, and repair and unavailability times

  9. Nuclear plant scram reduction

    International Nuclear Information System (INIS)

    Wiegle, H.R.

    1986-01-01

    The Nuclear Utility Management and Human Resources Committee (NUMARC) is a confederation of all 55 utilities with nuclear plants either in operation or under construction. NUMARC was formed in April 1984 by senior nuclear executives with hundreds of man-years of plant experience to improve (plant) performance and resolve NRC concerns. NUMARC has adopted 10 commitments in the areas of management, training, staffing and performance. One of these commitments is to strive to reduce automatic trips to 3 per year per unit for calendar year 1985 for plants in commercial operation greater than 3 years (with greater than 25% capacity factor). This goal applies to any unplanned automatic protection system trips at any time when the reactor is critical. Each utility has committed to develop methods to thoroughly evaluate all unplanned automatic trips to identify the root causes and formulate plans to correct the root causes thus reducing future unplanned scrams. As part of this program, the Institute of Nuclear Power Operations (INPO) collects and evaluates information on automatic reactor trips. It publishes the results of these evaluations to aid the industry to identify root causes and corrective actions

  10. Finnish Kullervo and chinese martial arts stories

    OpenAIRE

    Chen, Chapmen

    2006-01-01

    Introduction: There are many important Finnish plays but, due to language barrier, Finnish drama is seldom exported, particularly to Hong Kong and China.. Objective: To find out differences in mentality between the Finnish and Chinese peoples by comparing the partially localized Chinese translation of Aleksis Kivi’s tragedy, Kullervo, with genuine Chinese martial arts literature. Methodology: 1. Chapman Chen has translated the Finnish classic, Kullervo, directly from Finnish...

  11. The nuclear power situation in Finland

    International Nuclear Information System (INIS)

    Miettinen, J.K.

    1976-01-01

    and's limited choice of energy sources makes nuclear power especially lly attractive and it is estimated that in 1985 14% of the energy consumed will be nuclear, which will then be the second most important source after oil (49%). Four power reactors, Loviisa 1 and 2 and TVO 1 and 2, are at present under construction. The first two are Russian PWRs, the latter two Asea-Atom BWRs. Loviisa 3 and 4 are planned but not yet ordered, and plans for a 1000 MWe plant to the West of Helsinki exist. The nuclear controversy in Finland has mainly been repetitions of the US and Swedish debates since 1970. However, local opposition to the project W. of Helsinki, based on the sociological effects of the inflow of Finnish speaking workers into a rural Swedish speaking district has become apparent. In the long term 13 major nuclear power plants are envisaged by the year 2000. Finland is party to the NPT and the IAEA safeguard system. (JIW)

  12. Effects of nuclear electromagnetic pulse (EMP) on nuclear power plants

    International Nuclear Information System (INIS)

    Barnes, P.R.; Manweiler, R.W.; Davis, R.R.

    1977-09-01

    The electromagnetic pulse (EMP) from a high-altitude nuclear detonation consists of a transient pulse of high intensity electromagnetic fields. These intense fields induce current and voltage transients in electrical conductors. Although most nuclear power plant cables are not directly exposed to these fields, the attenuated EMP fields that propagate into the plant will couple some EMP energy to these cables. The report predicts the probable effects of the EMP transients that could be induced in critical circuits of safety-related systems. It was found that the most likely consequence of EMP for nuclear plants is an unscheduled shutdown. EMP could prolong the shutdown period by the unnecessary actuation of certain safety systems. In general, EMP could be a nuisance to nuclear power plants, but it is not considered a serious threat to plant safety

  13. Nuclear power plants maintenance

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    Nuclear power plants maintenance now appears as an important factor contributing to the competitivity of nuclea energy. The articles published in this issue describe the way maintenance has been organized in France and how it led to an actual industrial activity developing and providing products and services. An information note about Georges Besse uranium enrichment plant (Eurodif) recalls that maintenance has become a main data not only for power plants but for all nuclear industry installations. (The second part of this dossier will be published in the next issue: vol. 1 January-February 1989) [fr

  14. Cooling towers of nuclear power plants

    International Nuclear Information System (INIS)

    Mikyska, L.

    1986-01-01

    The specifications are given of cooling towers of foreign nuclear power plants and a comparison is made with specifications of cooling towers with natural draught in Czechoslovak nuclear power plants. Shortcomings are pointed out in the design of cooling towers of Czechoslovak nuclear power plants which have been derived from conventional power plant design. The main differences are in the adjustment of the towers for winter operation and in the designed spray intensity. The comparison of selected parameters is expressed graphically. (J.B.)

  15. Technical limitations of nuclear fuel materials and structures

    International Nuclear Information System (INIS)

    Hansson, L.; Planman, T.; Vitikainen, E.

    1993-05-01

    This report gives a summary of the tasks carried out within the project 'Technical limitations of nuclear fuel materials and structures' which belongs to the Finnish national research programme called 'Systems behaviour and operational aspects of safety'. The duration of the project was three years from 1990 to 1992. Most western LWR utilities, including the two Finnish ones have an incentive to implement extended burnup fuel cycles in their nuclear power plants. The aim of this project has been authorities to support them in the assessment and licensing of new fuel designs and materials. The research work of the project was focused on collecting and qualifying fuel performance data and on performing laboratory tests on fresh and irradiated cladding and structural materials. Moreover, knowledge of the high burnup phenomena was obtained through participation in international research projects such as OECD Halden Project and several Studsvik projects. Experimental work within the framework of the VVER fuel cooperative effort was also continued. (orig.)

  16. The operation of nuclear power plants

    International Nuclear Information System (INIS)

    Brosche, D.

    1992-01-01

    The duties to be performed in managing the operation of a nuclear power plant are highly diverse, as will be explained in this contribution by the examples of the Grafenrheinfeld Nuclear Power Station. The excellent safety record and the high availabilities of German nuclear power plants demonstrate that their operators have adopted the right approaches. Systematic evaluation of the operating experience accumulated inhouse and in other plants is of great significance in removing weak spots and improving operation. The manifold and complex activities in the structure of organization and of activities in a nuclear power plant require a high degree of division of labor. (orig.) [de

  17. 4. Nuclear power plant component failures

    International Nuclear Information System (INIS)

    1990-01-01

    Nuclear power plant component failures are dealt with in relation to reliability in nuclear power engineering. The topics treated include classification of failures, analysis of their causes and impacts, nuclear power plant failure data acquisition and processing, interdependent failures, and human factor reliability in nuclear power engineering. (P.A.). 8 figs., 7 tabs., 23 refs

  18. Preparation and practice for nuclear power plant operation

    International Nuclear Information System (INIS)

    Wu Xuesong; Lu Tiezhong

    2015-01-01

    The operational preparation of the nuclear power plant is an important work in nuclear power plant production preparation. Due to the construction period of nuclear power plant from starting construction to production is as long as five years, the professional requirements of nuclear power operation are very strict, and the requirements for nuclear safety are also extremely high. Especially after the Fukushima accident, higher requirements for the safe operation of nuclear power plant are posed by competent authorities of the national level, regulatory authorities and each nuclear power groups. Based on the characteristics of the construction phase of nuclear power plant and in combination with engineering practice, this paper expounds the system established in the field of nuclear power plant operation and generally analyses the related management innovation. (authors)

  19. Nuclear Power Plant Lifetime Management Study (I)

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Sung Yull; Jeong, Ill Seok; Jang, Chang Heui; Song, Taek Ho; Song, Woo Young [Korea Electric Power Research Institute, Taejon (Korea, Republic of); Jin, Tae Eun [Korea Power Engineering Company Consulting and Architecture Engineers, (Korea, Republic of); Kim, Woo Chul [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1997-12-31

    As the operation-year of nuclear power plant increases and finding sites for new nuclear power plant becomes harder, a comprehensive and systematic nuclear plant lifetime management(PLIM) program including life extension has to be established for stable and safe supply of electricity. A feasibility study was conducted to systematically evaluate technical, economic and regulatory aspect of plant lifetime managements and plant life extension for Kori-1 nuclear power plant. For technical evaluation of nuclear power plant, 13 major components were selected for lifetime evaluation by screening system. structure, and components(SSCs) of the plant. It was found that except reactor pressure vessel, which needs detailed integrity analysis, and low pressure turbine, which is scheduled to be replaced, 11 out of 13 major components have sufficient service life, for more than 40 years. Because domestic rules and regulations related to license renewal has not yet been written, review on the regulatory aspect of life extensions was conducted using US NRC rules and regulations. A cooperative effort with nuclear regulatory body is needed for early completion of license renewal rules and regulations. For economic evaluation of plant lifetime extension, a computer program was developed and used. It was found that 10 to 20 year of extension operation of Kori-1 nuclear power plant was proved. Based on the results, next phase of plant lifetime management program for detailed lifetime evaluation and presenting detailed implementation schedule for plant refurbishment for lifetime extension should be followed. (author). 74 refs., figs.

  20. Nuclear Power Plant Lifetime Management Study (I)

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Sung Yull; Jeong, Ill Seok; Jang, Chang Heui; Song, Taek Ho; Song, Woo Young [Korea Electric Power Research Institute, Taejon (Korea, Republic of); Jin, Tae Eun [Korea Power Engineering Company Consulting and Architecture Engineers, (Korea, Republic of); Kim, Woo Chul [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1996-12-31

    As the operation-year of nuclear power plant increases and finding sites for new nuclear power plant becomes harder, a comprehensive and systematic nuclear plant lifetime management(PLIM) program including life extension has to be established for stable and safe supply of electricity. A feasibility study was conducted to systematically evaluate technical, economic and regulatory aspect of plant lifetime managements and plant life extension for Kori-1 nuclear power plant. For technical evaluation of nuclear power plant, 13 major components were selected for lifetime evaluation by screening system. structure, and components(SSCs) of the plant. It was found that except reactor pressure vessel, which needs detailed integrity analysis, and low pressure turbine, which is scheduled to be replaced, 11 out of 13 major components have sufficient service life, for more than 40 years. Because domestic rules and regulations related to license renewal has not yet been written, review on the regulatory aspect of life extensions was conducted using US NRC rules and regulations. A cooperative effort with nuclear regulatory body is needed for early completion of license renewal rules and regulations. For economic evaluation of plant lifetime extension, a computer program was developed and used. It was found that 10 to 20 year of extension operation of Kori-1 nuclear power plant was proved. Based on the results, next phase of plant lifetime management program for detailed lifetime evaluation and presenting detailed implementation schedule for plant refurbishment for lifetime extension should be followed. (author). 74 refs., figs.

  1. Ways to maintain nuclear safety competence in Finland

    International Nuclear Information System (INIS)

    Vanttola, T.; Mattila, L.; Reiman, L.

    2000-01-01

    In mid-1990's, both Finnish nuclear power operators started extensive plant modernization. National surveys indicated that the present age distribution of nuclear power experts implies shortage of resources through retirement within 10 years, unless education is timely enhanced. The current rate of nuclear energy specific education, about 10 master's degrees per year, will be too low, particularly if construction of new nuclear capacity were started. The problem is recognised, and some measures have been initiated. In Finland continued public funding for nuclear energy research is judged important to assure impartial expertise for the safety authorities. This research has been organised as national research programmes, where the requirement to raise experts is emphasised. Challenging tasks have proved to be important in motivating the students and the permanent personnel. The specific features of the VVER reactors, participation in international R and D projects and, recently, design and assessment of ALWR concepts have offered such possibilities. The image of nuclear energy affects the interest of young generation when choosing a career. One way to improve the situation is to increase communication with the public and direct information to the potential students. The need for other than technical skills is also reflected in the latest work programme of the Young Generation Network, organised by the Finnish Nuclear Society. (authors)

  2. Nuclear plant life extension

    International Nuclear Information System (INIS)

    Negin, C.A.

    1989-01-01

    The nuclear power industry's addressing of life extension is a natural trend in the maturation of this technology after 20 years of commercial operation. With increasing emphasis on how plants are operated, and less on how to build them, attention is turning on to maximizing the use of these substantial investments. The first studies of life extension were conducted in the period from 1978 and 1982. These were motivated by the initiation, by the Nuclear Regulatory Commission (NRC), of studies to support decommissioning rulemaking. The basic conclusions of those early studies that life extension is feasible and worth pursuing have not been changed by the much more extensive investigations that have since been conducted. From an engineering perspective, life extension for nuclear plants is fundamentally the same as for fossil plants

  3. NUCLEAR POWER PLANT

    Science.gov (United States)

    Carter, J.C.; Armstrong, R.H.; Janicke, M.J.

    1963-05-14

    A nuclear power plant for use in an airless environment or other environment in which cooling is difficult is described. The power plant includes a boiling mercury reactor, a mercury--vapor turbine in direct cycle therewith, and a radiator for condensing mercury vapor. (AEC)

  4. Environmental impact assessments of a fifth nuclear power plant unit in Finland

    International Nuclear Information System (INIS)

    Aurela, Jorma; Koivisto, Katarina

    2000-01-01

    This paper presents the results of president questionnaires and media monitoring of press cuttings concerned with siting of the new fifth in a row Finnish NPP. Two years ago both Fortum Power and Heat Oy and Teollisuuden Voima Oy (TVO) launched their Environmental impact assessment (EIA) procedures of a new nuclear power unit in Finland. The EIA procedures were launched to investigate the environmental impacts of a fifth nuclear power plant which possibly will be built in Loviisa or at Olkiluoto. In Finland there are four operating NPP units, two in Loviisa (Fortum) and two in Eurajoki, Olkiluoto (TVO). In the EIA procedure citizens and various associations and authorities have an opportunity to express their views on the matters related to the project. The Ministry of Trade and Industry (MTI) as the coordination authority arranges the organisation of the EIA hearings and the collection of statements and opinions. The EIA procedure in Finland takes place in two stages. The first stage i.e. the EIA programme describes the project and presents the plan on how the environmental effects are investigated and assessed. In the second stage the actual assessment of the environmental effects of the project will be submitted. Both Fortum and Teollisuuden Voima Oy (TVO) launched in spring 1998 their EIA procedures. The main alternatives are the Loviisa 3 project includes two plant type alternatives. The size of the plant is between 1000 and 1700 MWe, and the extension project of the Olkiluoto NPP to build a NPP unit of about 1000-1500 MWe at Olkiluoto. The EIA reports were submitted to the MTI in August 1999 and after that they were on display for two months for opinions and statements

  5. QA programs in nuclear power plants

    International Nuclear Information System (INIS)

    Ellingson, A.C.

    1976-01-01

    As an overview of quality assurance programs in nuclear power plants, the energy picture as it appears today is reviewed. Nuclear power plants and their operations are described and an attempt is made to place in proper perspective the alleged ''threats'' inherent in nuclear power. Finally, the quality assurance programs being used in the nuclear industry are described

  6. At the Roots of Finnish Elementary Education – How Were Children Raised in the First Finnish Elementary Schools?

    Directory of Open Access Journals (Sweden)

    Satu UUSIAUTTI

    2013-03-01

    Full Text Available This study dissects the history of Finnish elementary education and the way children were raised during the initial phase of Finnish education in the 18th century. The development of Finnish education was studied through contemporary decrees and laws and studies of Finnish school history. The preliminary aim was to focus on the principles and practices of raising children in Finnish schools. This study focuses on (1 describing the birth, goals, and practices of Finnish elementary education and development toward compulsory education, (2 describing the way children were raised toward the contemporary goals, and (3 dissecting the connection between teacher training and the goals of raising children in Finnish schools. All these viewpoints are discussed from the viewpoint of how the aspirations and objectives were realized and implemented in practice in raising children. As a conclusion, we discuss the influence of the past in today’s educational practices.

  7. At the Roots of Finnish Elementary Education –How Were Children Raised in the First Finnish Elementary Schools?

    Directory of Open Access Journals (Sweden)

    Satu UUSIAUTTI

    2013-03-01

    Full Text Available This study dissects the history of Finnish elementary education and the way children were raised during the initial phase of Finnish education in the 18th century. The development of Finnish education was studied through contemporary decrees and laws and studies of Finnish school history. The preliminary aim was to focus on the principles and practices of raising children in Finnish schools. This study focuses on (1 describing the birth, goals, and practices of Finnish elementary education and development toward compulsory education, (2 describing the way children were raised toward the contemporary goals, and (3 dissecting the connection between teacher training and the goals of raising children in Finnish schools. All these viewpoints are discussed from the viewpoint of how the aspirations and objectives were realized and implemented in practice in raising children. As a conclusion, we discuss the influence of the past in today’s educational practices.

  8. Atucha I nuclear power plant transients analysis

    International Nuclear Information System (INIS)

    Castano, J.; Schivo, M.

    1987-01-01

    A program for the transients simulation thermohydraulic calculation without loss of coolant (KWU-ENACE development) to evaluate Atucha I nuclear power plant behaviour is used. The program includes systems simulation and nuclear power plants control bonds with real parameters. The calculation results show a good agreement with the output 'protocol' of various transients of the nuclear power plant, keeping the error, in general, lesser than ± 10% from the variation of the nuclear power plant's state variables. (Author)

  9. Safety culture in the Finnish and Swedish nuclear industries - history and present

    Energy Technology Data Exchange (ETDEWEB)

    Reiman, T.; Pietikaeinen, E. (Technical Research Centre of Finland, VTT (Finland)); Kahlbom, U. (RiskPilot AB (Sweden)); Rollenhagen, C. (Royal Institute of Technology (KTH) (Sweden))

    2010-03-15

    The report presents results from an interview study that examined the characteristics of the Nordic nuclear branch safety culture. The study also tested the theoretical model of safety culture developed by the authors. The interview data was collected in Sweden (n = 14) and Finland (n = 16). Interviewees represented the major actors in the nuclear field (regulators, power companies, expert organizations, waste management organizations). The study gave insight into the nature of safety culture in the nuclear industry. It provided an overview on the variety of factors that people in the industry consider important for safety. The respondents rather coherently saw such psychological states as motivation, mindfulness, sense of control, understanding of hazards and safety and sense of responsibility as important for nuclear safety. Some of the respondents described a certain Nordic orientation towards safety. One characteristic was a sense of personal responsibility for safety. However, there was no clear agreement on the existence of a shared Nordic nuclear safety culture. Sweden and Finland were seen different for example in the way the co-operation between plants and nuclear safety authorities was arranged and re-search activities organized. There were also perceived differences in the way everyday activities like decision making were carried out in the organizations. There are multiple explanations for the differences. The industry in Sweden has been driven by the strong supplier. In Finland the regulator's role in shaping the culture has been more active. Other factors creating differences are e.g. national culture and company culture and the type of the power plant. Co-operation between Nordic nuclear power organizations was viewed valuable yet challenging from safety point of view. The report concludes that a good safety culture requires a deep and wide under-standing of nuclear safety including the various accident mechanisms of the power plants as well as

  10. Safety culture in the Finnish and Swedish nuclear industries - history and present

    International Nuclear Information System (INIS)

    Reiman, T.; Pietikaeinen, E.; Kahlbom, U.; Rollenhagen, C.

    2010-03-01

    The report presents results from an interview study that examined the characteristics of the Nordic nuclear branch safety culture. The study also tested the theoretical model of safety culture developed by the authors. The interview data was collected in Sweden (n = 14) and Finland (n = 16). Interviewees represented the major actors in the nuclear field (regulators, power companies, expert organizations, waste management organizations). The study gave insight into the nature of safety culture in the nuclear industry. It provided an overview on the variety of factors that people in the industry consider important for safety. The respondents rather coherently saw such psychological states as motivation, mindfulness, sense of control, understanding of hazards and safety and sense of responsibility as important for nuclear safety. Some of the respondents described a certain Nordic orientation towards safety. One characteristic was a sense of personal responsibility for safety. However, there was no clear agreement on the existence of a shared Nordic nuclear safety culture. Sweden and Finland were seen different for example in the way the co-operation between plants and nuclear safety authorities was arranged and re-search activities organized. There were also perceived differences in the way everyday activities like decision making were carried out in the organizations. There are multiple explanations for the differences. The industry in Sweden has been driven by the strong supplier. In Finland the regulator's role in shaping the culture has been more active. Other factors creating differences are e.g. national culture and company culture and the type of the power plant. Co-operation between Nordic nuclear power organizations was viewed valuable yet challenging from safety point of view. The report concludes that a good safety culture requires a deep and wide under-standing of nuclear safety including the various accident mechanisms of the power plants as well as a

  11. Guidelines for nuclear plant response to an earthquake

    International Nuclear Information System (INIS)

    1989-12-01

    Guidelines have been developed to assist nuclear plant personnel in the preparation of earthquake response procedures for nuclear power plants. The objectives of the earthquake response procedures are to determine (1) the immediate effects of an earthquake on the physical condition of the nuclear power plant, (2) if shutdown of the plant is appropriate based on the observed damage to the plant or because the OBE has been exceeded, and (3) the readiness of the plant to resume operation following shutdown due to an earthquake. Readiness of a nuclear power plant to restart is determined on the basis of visual inspections of nuclear plant equipment and structures, and the successful completion of surveillance tests which demonstrate that the limiting conditions for operation as defined in the plant Technical Specifications are met. The guidelines are based on information obtained from a review of earthquake response procedures from numerous US and foreign nuclear power plants, interviews with nuclear plant operations personnel, and a review of reports of damage to industrial equipment and structures in actual earthquakes. 7 refs., 4 figs., 4 tabs

  12. Next Generation Nuclear Plant Project Evaluation of Siting a HTGR Co-generation Plant on an Operating Commercial Nuclear Power Plant Site

    International Nuclear Information System (INIS)

    Demick, L.E.

    2011-01-01

    This paper summarizes an evaluation by the Idaho National Laboratory (INL) Next Generation Nuclear Plant (NGNP) Project of siting a High Temperature Gas-cooled Reactor (HTGR) plant on an existing nuclear plant site that is located in an area of significant industrial activity. This is a co-generation application in which the HTGR Plant will be supplying steam and electricity to one or more of the nearby industrial plants.

  13. Next Generation Nuclear Plant Project Evaluation of Siting a HTGR Co-generation Plant on an Operating Commercial Nuclear Power Plant Site

    Energy Technology Data Exchange (ETDEWEB)

    L.E. Demick

    2011-10-01

    This paper summarizes an evaluation by the Idaho National Laboratory (INL) Next Generation Nuclear Plant (NGNP) Project of siting a High Temperature Gas-cooled Reactor (HTGR) plant on an existing nuclear plant site that is located in an area of significant industrial activity. This is a co-generation application in which the HTGR Plant will be supplying steam and electricity to one or more of the nearby industrial plants.

  14. Medium-size nuclear plants

    International Nuclear Information System (INIS)

    Vogelweith, L.; Lavergne, J.C.; Martinot, G.; Weiss, A.

    1977-01-01

    CEA (TECHNICATOME) has developed a range of pressurized water reactors of the type ''CAS compact'' which are adapted to civil ship propulsion, or to electric power production, combined possibly with heat production, up to outputs equivalent to 125 MWe. Nuclear plants equipped with these reactors are suitable to medium-size electric networks. Among the possible realizations, two types of plants are mentioned as examples: 1) Floating electron-nuclear plants; and 2) Combined electric power and desalting plants. The report describes the design characteristics of the different parts of a 125 MWe unit floating electro-nuclear plant: nuclear steam system CAS 3 G, power generating plant, floating platform for the whole plant. The report gives attention to the different possibilities according to site conditions (the plant can be kept floating, in a natural or artificial basin, it can be put aground, ...) and to safety and environment factors. Such unit can be used in places where there is a growing demand in electric power and fresh water. The report describes how the reactor, the power generating plant and multiflash distillation units of an electric power-desalting plant can be combined: choice of the ratio water output/electric power output, thermal cycle combination, choice of the gain ratio, according to economic considerations, and to desired goal of water output. The report analyses also some technical options, such as: choice of the extraction point of steam used as heat supply of the desalting station (bleeding a condensation turbine, or recovering steam at the exhaust of a backpressure turbine), design making the system safe. Lastly, economic considerations are dealt with: combining the production of fresh water and electric power provides usually a much better energy balance and a lower cost for both products. Examples are given of some types of installations which combine medium-size reactors with fresh water stations yielding from 10000 to 120000 m 3 per day

  15. Analysis of color environment in nuclear power plants

    International Nuclear Information System (INIS)

    Natori, Kazuyuki; Akagi, Ichiro; Souma, Ichiro; Hiraki, Tadao; Sakurai, Yukihiro.

    1996-01-01

    This article reports the results of color and psychological analysis of the outlook of nuclear power plants and the visual environments inside of the plants. Study one was the color measurements of the outlook of nuclear plants and the visual environment inside of the plants. Study two was a survey of the impressions on the visual environments of nuclear plants obtained from observers and interviews of the workers. Through these analysis, we have identified the present state of, and the problems of the color environments of the nuclear plants. In the next step, we have designed the color environments of inside and outside of the nuclear plants which we would recommend (inside designs were about fuel handling room, operation floor of turbine building, observers' pathways, central control room, rest room for the operators). Study three was the survey about impressions on our design inside and outside of the nuclear plants. Nuclear plant observers, residents in Osaka city, residents near the nuclear plants, the operators, employees of subsidiary company and the PR center guides rated their impressions on the designs. Study four was the survey about the design of the rest room for the operators controlling the plants. From the results of four studies, we have proposed some guidelines and problems about the future planning about the visual environments of nuclear power plants. (author)

  16. Modelling of nuclear power plant decommissioning financing.

    Science.gov (United States)

    Bemš, J; Knápek, J; Králík, T; Hejhal, M; Kubančák, J; Vašíček, J

    2015-06-01

    Costs related to the decommissioning of nuclear power plants create a significant financial burden for nuclear power plant operators. This article discusses the various methodologies employed by selected European countries for financing of the liabilities related to the nuclear power plant decommissioning. The article also presents methodology of allocation of future decommissioning costs to the running costs of nuclear power plant in the form of fee imposed on each megawatt hour generated. The application of the methodology is presented in the form of a case study on a new nuclear power plant with installed capacity 1000 MW. © The Author 2015. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  17. Proceedings of an international workshop on historic dose experience and dose reduction (ALARA) at nuclear power plants

    International Nuclear Information System (INIS)

    Horan, J.R.; Baum, J.W.; Dionne, B.J.

    1985-06-01

    Dose reduction data and experience from 28 foreign and 10 US nuclear power plants was examined to determine causes for the wide variations in occupational dose from country to country. Major topics discussed were: steam generator and refueling maintenance problems; utility and supplier ALARA programs; effectiveness of dose-reduction modifications; attitudes and training; current and future dose-reduction research. While many parameters contribute to differences of occupational doses between plants from different nations, it is clear that most US plants have higher collective dose equivalent per reactor per megawatt-year than most other countries, even for plants of similar size and age. Worldwide, Finnish and Swedish plants, both PWR and BWR, have achieved the lowest values. Major factors which contribute to low doses include: (1) minimization of cobalt in primary system components exposed to water; (2) careful plant design, layout and component segregation and shielding; (3) plant standardization; (4) selection of components and systems for increased reliability; (5) management interest and commitment; (6) minimum number of workers and in-depth worker training; (7) careful control of primary system oxygen and pH; (8) good primary system water purity to minimize corrosion product formation; (9) use of special tools and robotics; (10) decontamination and passivation of primary systems and components; and (11) extent of backfitting and mandated inspections

  18. World nuclear power plant capacity

    International Nuclear Information System (INIS)

    1991-01-01

    This report provides the background information for statistics and analysis developed by NUKEM in its monthly Market Report on the Nuclear Fuel Cycle. The assessments in this Special Report are based on the continuous review of individual nuclear power plant projects. This Special Report begins with tables summarizing a variety of nuclear power generating capacity statistics for 1990. It continues with a brief review of the year's major events regarding each country's nuclear power program. The standard NUKEM Market Report tables on nuclear plant capacity are given on pages 24 and 25. Owing to space limitations, the first year shown is 1988. Please refer to previous Special Reports for data covering earlier years. Detailed tables for each country list all existing plants as well as those expected by NUKEM to be in commercial operation by the end of 2005. An Appendix containing a list of abbreviations can be found starting on page 56. Only nuclear power plants intended for civilian use are included in this Special Report. Reactor lifetimes are assumed to be 35 years for all light water reactors and 30 years for all other reactor types, unless other data or definite decommissioning dates have been published by the operators. (orig./UA) [de

  19. Development of nuclear power plant Risk Monitor

    International Nuclear Information System (INIS)

    Yang Xiaoming; Sun Jinlong; Ma Chao; Wang Lin; Gu Xiaohui; Bao Zhenli; Qu Yong; Zheng Hao

    2014-01-01

    Risk Monitor is a tool to monitor the real-time risk of a nuclear power plant for risk management and comprehensive decision-making, which has been widely used all over the world. The nuclear power plant Risk Monitor applies the real-time risk model with low-complicacy that could reflect the plant's actual configuration, automatically reads the plant's configuration information from the engineering system through the developed interface, and efficiently analyzes the plant's risk Dy the intelligent parallel-computing method in order to provide the risk basement for the safety management of nuclear power plant. This paper generally introduces the background, architecture, functions and key technical features of a nuclear power plant Risk Monitor, and validates the risk result, which could well reflect the plant's risk information and has a significant practical value. (authors)

  20. Finnish support programme to IAEA safeguards. Annual report 1993; Suomen tukiohjelma IAEA:n safeguards-valvonnalle. Vuoden 1993 toimintakertomus

    Energy Technology Data Exchange (ETDEWEB)

    Tarvainen, M [ed.

    1994-03-01

    Implementation of the Finnish Support Programme to IAEA Safeguards (FINSP) during the calender year in question is summarized. FINSP is carried out through separate tasks related to development of non-destructive measurement methods (NDA methods) for verification of nuclear material, training and expert services to the IAEA. In addition to a Finnish summary, the report includes detailed description of each task in English. (editor).

  1. Finnish support programme to IAEA safeguards. Annual report 1992; Suomen tukiohjelma IAEA:n safeguards-valvonnalle. Vuoden 1992 toimintakertomus

    Energy Technology Data Exchange (ETDEWEB)

    Tarvainen, M [ed.

    1993-04-01

    Implementation of the Finnish Support Programme to IAEA Safeguards (FINSP) during the calender year in question is summarized. FINSP is carried out through separate tasks related to development of non-destructive measurement methods (NDA methods) for verification of nuclear material, training and expert services to the IAEA. In addition to a Finnish summary, the report includes detailed description of each task in English. (editor).

  2. HVDC transmission from nuclear power plant

    International Nuclear Information System (INIS)

    Yoshida, Yukio; Takenaka, Kiyoshi; Taniguchi, Haruto; Ueda, Kiyotaka

    1980-01-01

    HVDC transmission directly from a nuclear power plant is expected as one of the bulk power transmission systems from distant power generating area. Successively from the analysis of HVDC transmission from BWR-type nuclear power plant, this report discusses dynamic response characteristics of HVDC transmission (double poles, two circuits) from PWR type nuclear power plant due to dc-line faults (DC-1LG, 2LG) and ac-line faults (3LG) near inverter station. (author)

  3. The application of plant information system on third Qinshan nuclear power plant

    International Nuclear Information System (INIS)

    Liu Wangtian

    2005-01-01

    Plant overall control has been applied in Qinshan Nuclear Power Plant, which enhances the security of plant operation, but it is not enough to improve the technical administration level. In order to integrate the overall information and to improve the technical administration level more. Third Qinshan Nuclear Power Plant applies the plant information system. This thesis introduces the application of plant information system in Third Qinshan Nuclear Power Plant and the effect to the plant after the system is carried into execution, in addition, it does more analysis and exceptions for application of plant information system in the future. (authors)

  4. Safety criteria for nuclear chemical plants

    International Nuclear Information System (INIS)

    Ball, P.W.; Curtis, L.M.

    1983-01-01

    Safety measures have always been required to limit the hazards due to accidental release of radioactive substances from nuclear power plants and chemical plants. The risk associated with the discharge of radioactive substances during normal operation has also to be kept acceptably low. BNFL (British Nuclear Fuels Ltd.) are developing risk criteria as targets for safe plant design and operation. The numerical values derived are compared with these criteria to see if plants are 'acceptably safe'. However, the criteria are not mandatory and may be exceeded if this can be justified. The risk assessments are subject to independent review and audit. The Nuclear Installations Inspectorate also has to pass the plants as safe. The assessment principles it uses are stated. The development of risk criteria for a multiplant site (nuclear chemical plants tend to be sited with many others which are related functionally) is discussed. This covers individual members of the general public, societal risks, risks to the workforce and external hazards. (U.K.)

  5. Development on database for foreign nuclear power plants

    International Nuclear Information System (INIS)

    Okuda, Yasunori; Yanagi, Chihiro

    1999-01-01

    The Nuclear Information Project in Institute of Nuclear Technology, Institute of Nuclear Safety Systems, Inc. (INSS) has been carrying out two activities related to technical information about nuclear power plants. The first is collection and analysis of accidents and incidents (troubles) of nuclear power plants in U.S.A. and West Europe and making draft of action proposals. The second is collection of main laws, government ordinances, regulatory guides, standard and domestic and international technical news connected with nuclear power plants. This report describes these two data bases about nuclear power plants details. (author)

  6. Chemistry management system for nuclear power plants

    International Nuclear Information System (INIS)

    Nagasawa, Katsumi; Maeda, Katsuji

    1998-01-01

    Recently, the chemistry management in the nuclear power plants has been changing from the problem solution to the predictive diagnosis and maintenance. It is important to maintain the integrity of plant operation by an adequate chemistry control. For these reasons, many plant operation data and chemistry analysis data should be collected and treated effectively to evaluate chemistry condition of the nuclear power plants. When some indications of chemistry anomalies occur, quick and effective root cause evaluation and countermeasures should be required. The chemistry management system has been developed as to provide sophisticate chemistry management in the nuclear power plants. This paper introduces the concept and functions of the chemistry management system for the nuclear power plants. (author)

  7. Life management plants at nuclear power plants PWR; Planes de gestion de vida en centrales nucleares PWR

    Energy Technology Data Exchange (ETDEWEB)

    Esteban, G.

    2014-10-01

    Since in 2009 the CSN published the Safety Instruction IS-22 (1) which established the regulatory framework the Spanish nuclear power plants must meet in regard to Life Management, most of Spanish nuclear plants began a process of convergence of their Life Management Plants to practice 10 CFR 54 (2), which is the current standard of Spanish nuclear industry for Ageing Management, either during the design lifetime of the plant, as well as for Long-Term Operation. This article describe how Life Management Plans are being implemented in Spanish PWR NPP. (Author)

  8. YKAe - Nuclear power plant systems behaviour and operational aspects of safety

    International Nuclear Information System (INIS)

    Hayns, M.R.; Wolfert, K.; Sandervaag, O.

    1992-12-01

    The report is a mid term evaluation of the YKAe programme started in 1990. In the area safe margins of nuclear fuel and reactor core the work in support of improved performance of LWR fuel is primarily an economic matter and, therefore, should be funded directly by the utilities. As regards assessment of transient and accident situations the experiments in the PACTEL facility provide conditions for VVER reactors which are not available anywhere else. Every effort should be made to utilize this facility in further international programmes. The analysis methods developed for accident and the fire risk studies are excellent and well focused in the specific needs of the Finnish programmes. Further activities in transient and accident modelling should be coupled with the work of the APROS programme. Studies on the new technology in supervision and control of nuclear power plant processes are of special importance to Finland either for the 5th nuclear power station or for the upgrading existing systems. The work on computerized operator support systems looks to be achieving maturity and should be considered for more downstream funding. The human factors studies are of direct relevance to reactor operations. The human factors research appears sub-critical and deserves more support. Overall, the Evaluation Team felt that this small programme was well focused on Finland's needs, well integrated into the international programmes and provided good value for money. The programme direction and balance is good, and with only minor shift emphasis, should carry on its projected course

  9. Nuclear power plant V-1

    International Nuclear Information System (INIS)

    1998-01-01

    The nuclear power plant Bohunice V -1 is briefly described. This NPP consists from two reactor units. Their main time characteristics are (Reactor Unit 1, Reactor Unit 2): beginning of construction - 24 April 1972; first controlled reactor power - 27 November 1978, 15 March 1980; connection to the grid - 17 December 1978, 26 March 1980; commercial operation - 1 April 1980, 7 January 1981. This leaflet contains: NPP V-1 construction; Major technological equipment (Primary circuit: Nuclear reactor [WWER 440 V230 type reactor];Steam generator; Reactor Coolant Pumps; Primary Circuit Auxiliary Systems. Secondary circuit: Turbine generators, Nuclear power plant electrical equipment; power plant control) and technical data

  10. Man and nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    According to the Inst. fuer Unfallforschung/TUeV Rheinland, Koeln, the interpretation of empirical data gained from the operation of nuclear power plants at home and abroad during the period 1967-1975 has shown that about 38% of all reactor accidents were caused by human failures. These occured either during the design and construction, the commissioning, the reconditioning or the operation of the plants. This very fact stresses human responsibility for the safety of nuclear power plants, in spite of those plants being automated to a high degree and devices. (orig.) [de

  11. 75 FR 16524 - FirstEnergy Nuclear Operating Company, Perry Nuclear Power Plant; Exemption

    Science.gov (United States)

    2010-04-01

    ... Company, Perry Nuclear Power Plant; Exemption 1.0 Background FirstEnergy Nuclear Operating Company (FENOC... the Perry Nuclear Power Plant, Unit 1 (PNPP). The license provides, among other things, that the... date for all operating nuclear power plants, but noted that the Commission's regulations provide...

  12. Challenges for new nuclear plants

    International Nuclear Information System (INIS)

    Bruschi, H.J.

    2000-01-01

    In the past 20 years, numerous new nuclear plant designs have been introduced in the hope of generating a mixture of features and benefits that generated enough enthusiasm amongst the utility industry decision makers to move forward with a new nuclear generation. Not only has there not been enough enthusiasm, there has been little interest in building new plants with advanced features, especially in the U.S. Compounding this predicament are the changing paradigms to which a new plant would be measured. The near hiatus on new plant orders is the clear cause of the significant consolidation in the nuclear industry. Regardless whether the disappearance of old-line nuclear companies is over or not, some paradigms for new generation designs are unmovable, while others are still under discussion as to their role in future plant designs. This paper will address those design goals that Westinghouse deems already having earned the rank of exemplar, and those still open to debate. Because it is my hope that this paper will lead to a fruitful discussion period, I will provide a list of what I feel are the champion design requirements, and those I consider the contenders. (author)

  13. Safety culture in nuclear power plants

    International Nuclear Information System (INIS)

    Weihe, G. von; Pamme, H.

    2003-01-01

    Experience shows that German nuclear power plants have always been operated reliably and safely. Over the years, the safety level in these plants has been raised considerably so that they can stand any comparison with other countries. This is confirmed by the two reports published by the Federal Ministry for the Environment on the nuclear safety convention. Behind this, there must obviously stand countless appropriate 'good practices' and a safety management system in nuclear power plants. (orig.) [de

  14. Elecnuc - Nuclear power plants in the world - 2009 edition

    International Nuclear Information System (INIS)

    2009-01-01

    This small booklet summarizes in tables all data relative to the nuclear power plants worldwide. These data come from the IAEA's PRIS and AREVA-CEA's GAIA databases. The following aspects are reviewed: 2008 highlights, Main characteristics of reactor types, Map of the French nuclear power plants on 2008/01/01, Worldwide status of nuclear power plants (12/31/2008), Units distributed by countries, Nuclear power plants connected to the Grid- by reactor type groups, Nuclear power plants under construction on 2008, Evolution of nuclear power plants capacities connected to the grid, First electric generations supplied by a nuclear unit in each country, Electrical generation from nuclear powe plants by country at the end 2008, Performance indicator of french PWR units, Evolution of the generation indicators worldwide by type, Nuclear operator ranking according to their installed capacity, Units connected to the grid by countries at 12/31/2008, Status of licence renewal applications in USA, Nuclear power plants under construction at 12/31/2008, Shutdown reactors, Exported nuclear capacity in net MWe, Exported and national nuclear capacity connected to the grid, Exported nuclear power plants under construction, Exported and national nuclear capacity under construction, Nuclear power plants ordered at 12/31/2008, Long term shutdown units at 12/31/2008, COL applications in the USA, Recycling of Plutonium in reactors and experiences, Mox licence plants projects, Appendix - historical development, Meaning of the used acronyms, Glossary

  15. ELECNUC Nuclear power plants in the world - 2013 edition

    International Nuclear Information System (INIS)

    2013-01-01

    This small booklet summarizes in a series of tables the figures relative to the nuclear power plants worldwide. Data come from the IAEA's PRIS database and from specific I-tese studies. The following aspects are reviewed: 2012 highlights; Main characteristics of reactor types; Map of the French nuclear power plants on 2012/01/01; Worldwide status of nuclear power plants (12/31/2012); Units distributed by countries; Nuclear power plants connected to the Grid- by reactor type groups; Nuclear power plants under construction on 2012; Evolution of nuclear power plants capacities connected to the grid; First electric generations supplied by a nuclear unit in each country; Electrical generation from nuclear power plants by country at the end 2012; Performance indicator of french PWR units; Evolution of the generation indicators worldwide by type; Nuclear operator ranking according to their installed capacity; Units connected to the grid by countries at 12/31/2012; Status of licence renewal applications in USA; Nuclear power plants under construction at 12/31/2012; Shutdown reactors; Exported nuclear capacity in net MWe; Exported and national nuclear capacity connected to the grid; Exported nuclear power plants under construction; Exported and national nuclear capacity under construction; Nuclear power plants ordered at 12/31/2012; Long term shutdown units at 12/31/2012; COL (Combined Licence) applications in the USA; Recycling of Plutonium in reactors and experiences; Mox licence plants projects; Appendix - historical development; Meaning of the used acronyms; Glossary

  16. Finnish Bioenergy Association - Finbio

    International Nuclear Information System (INIS)

    Sopo, R.

    1999-01-01

    The Finnish Bioenergy Association, was founded in November 1991 in the city of Jyvaeskylae. In November 1996, the membership of FINBIO consisted of 17 contributing collective members and 75 individual members. Members of the organization include e.g. the Association of Finnish Peat Industries, Wood Energy Association and Finnish Biogas Centre, all of which represent specific bioenergy fields in Finland. The Finnish Bioenergy Association is a private, non-profit organization the objectives of which are to promote and develop harvesting, transportation and processing of biofuels and other biomass (wood-based biofuels, non-food crops, peat, biowaste); to promote the use of biomass in energy production and in other applications, in accordance with environmentally sound and sustainable development. The objectives of FINBIO is to promote the production and application of all forms of bioenergy in Finland. FINBIO acts as a coordinator for AEBIOM (the European Biomass Association) and its member associations, as well as for other international bioenergy-related organizations

  17. Implication of dual-purpose nuclear desalination plants

    International Nuclear Information System (INIS)

    Kutbi, I.I.

    1983-01-01

    Available dual purpose nuclear desalination schemes are reviewed. Three specific issues namely, impact of availability and reliability of the desalination stage of the plant, integration of the desalination and power production stages and new safety concerns of dual system, relating to desalination schemes are discussed. Results of operational and reliability studies of nuclear power stations, reverse osmosis and multistage flash distillation desalination plants are considered. Operational aspects of nuclear-multistage flash distillation, nuclear-reverse osmosis and nuclear-multistage flash distillation-reverse osmosis are compared. Concludes that the combined nuclear-multistage flash distillation-reverse osmosis plant arrangement permits very large production capacity, high availability, improvement of plant reliability and proovision of savings on the cost of water and power produced. 23 Ref

  18. Quantifying the social costs of nuclear energy: Perceived risk of accident at nuclear power plants

    International Nuclear Information System (INIS)

    Huhtala, Anni; Remes, Piia

    2017-01-01

    The preferences expressed in voting on nuclear reactor licenses and the risk perceptions of citizens provide insights into social costs of nuclear power and decision making in energy policy. We show analytically that these costs consist of disutility caused by unnecessary anxiety - due to misperceived risks relating to existing reactors - and where licenses for new nuclear reactors are not granted, delayed or totally lost energy production. Empirical evidence is derived from Finnish surveys eliciting explicitly the importance of risk perceptions on preferences regarding nuclear power and its environmental and economic impacts. We show that the estimated marginal impact of a high perceived risk of nuclear accident is statistically significant and that such a perception considerably decreases the probability of a person supporting nuclear power. This result holds across a number of robustness checks including an instrumental variable estimation and a model validation by observed voting behavior of the members of Parliament. The public's risk perceptions translate into a significant social cost, and are likely to affect the revenues, costs and financing conditions in the nuclear power sector in the future. - Highlights: • Survey on preferences regarding nuclear power and its environmental and economic impacts utilized. • A high perceived risk of nuclear accident decreases support for nuclear power. • The public's risk perceptions translate into a significant social cost.

  19. Nuclear power plants: 2009 atw compact statistics

    International Nuclear Information System (INIS)

    Anon.

    2010-01-01

    At the turn of 2009/2010, nuclear power plants were available for energy supply in 30 countries of the world. A total of 437 nuclear power plants, which is one plant less than at the 2008/2009 turn, were in operation with an aggregate gross power of approx. 391 GWe and an aggregate net power, respectively, of 371 GWe. The available gross power of nuclear power plants did not changed noticeably from 2008 to the end of 2009. In total 2 nuclear generating units were commissioned in 2009. One NPP started operation in India and one in Japan. Three nuclear generating units in Japan (2) und Lithuania (1) were decomissioned in 2009. 52 nuclear generating units, i.e. 10 plants more than at the end of 2008, with an aggregate gross power of approx. 51 GWe, were under construction in 14 countries end of 2009. New or continued projects are notified from (number of new projects): China (+9), Russia (1), and South Korea (1). Some 84 new nuclear power plants are in the concrete project design, planning and licensing phases worldwide; on some of them, contracts have already been awarded. Another units are in their preliminary project phases. (orig.)

  20. Nuclear power plants: 2008 atw compact statistics

    International Nuclear Information System (INIS)

    Anon.

    2009-01-01

    At the turn of 2008/2009, nuclear power plants were available for energy supply in 31 countries of the world. A total of 438 nuclear power plants, which is one plant less than at the 2007/2008 turn, were in operation with an aggregate gross power of approx. 393 GWe and an aggregate net power, respectively, of 372 GWe. The available gross power of nuclear power plants didn't changed noticeabely from 2007 to the end of 2008. No nuclear generating unit was commissioned in 2008. One nuclear generating unit in the Slovak Republic was decomissioned in 2008. 42 nuclear generating units, i.e. 10 plants more than at the end of 2007, with an aggregate gross power of approx. 38 GWe, were under construction in 14 countries end of 2008. New or continued projects are notified from (in brackets: number of new projects): Bulgaria (2), China (5), South Korea (2), Russia (1), and the Slovak Republic (2). Some 80 new nuclear power plants are in the concrete project design, planning and licensing phases worldwide; on some of them, contracts have already been awarded. Another approximately 120 units are in their preliminary project phases. (orig.)

  1. Fire scenarios in nuclear power plant

    International Nuclear Information System (INIS)

    Asp, I.B.; MacDougall, E.A.; Hall, R.E.

    1978-01-01

    This report defines a Design Base Fire and looks at 3 major areas of a hypothetical model for a Nuclear Power Plant. In each of these areas a Design Base Fire was developed and explained. In addition, guidance is given for comparing fire conditions of a given Nuclear Power Plant with the model plant described. Since there is such a wide variation in nuclear plant layouts, model areas were chosen for simplicity. The areas were not patterned after any existing plant area; rather several plant layouts were reviewed and a simplified model developed. The developed models considered several types of fires. The fire selected was considered to be the dominant one for the case in point. In general, the dominant fire selected is time dependent and starts at a specific location. After these models were developed, a comparison was drawn between the model and an operating plant for items such as area, cable numbers and weight, tray sizes and lengths. The heat loads of the model plant are summarized by area and compared with those of an actual operating plant. This document is intended to be used as a guide in the evaluation of fire hazards in nuclear power stations and a summarization of one acceptable analytical methodology to accomplish this

  2. Ventilation-air conditioner system in nuclear power plant

    International Nuclear Information System (INIS)

    Kubota, Ryuji; Sugisaki, Toshihiko.

    1989-01-01

    This invention concerns a ventilation-air conditioner system which enables, upon occurrence of accidents in a nuclear power plant, continuous operation for other adjacent nuclear power plants with no effect of accidents. Air supply system and exhaust system are operated during usual operaiton. If loss of coolants accidents should occur in an adjacent nuclear power plants, operation is switched from ventilation operaiton to the operation of re-cycling system based on an AND logic of three signals, that is, a pressure HIGH signal for the reactor container, a water level LOW signal for the reactor and a radioactivity signal of the ventilation-air conditioner sytem on the side of air supply in the nuclear power plant. Thus, nuclear reactor buildings of the nuclear power plant are from the external atmosphere. Therefore, the radioactivity HIGH signal for switching to the emergency air conditioner system of the nuclear power plant is not actuated due to the loss of coolant accidents in the adjacent nuclear power plant. In addition, since the atmospheric temperature in the nuclear reactor building can be maintained by a cooling device disposed to the recycling system, reactor shutdown can be prevented. (I.S.)

  3. Vital areas at nuclear power plants

    International Nuclear Information System (INIS)

    Cameron, D.F.

    1985-01-01

    Vital area analysis of nuclear power plants has been performed for the Nuclear Regulatory Commission by the Los Alamos National Laboratory from the late 1970's through the present. The Los Alamos Vital Area Study uses a fault-tree modeling technique to identify vital areas and equipment at nuclear power plants to determine their vulnerability. This technique has been applied to all operating plants and approximately one-half of those under construction in the US. All saboteur-induced loss-of-coolant accidents and transients and the systems needed to mitigate them are considered. As a result of this effort, security programs at nuclear power plants now include vulnerability studies that identify targets in a systematic manner, and thus unnecessary protection has been minimized. 1 ref., 8 figs., 1 tab

  4. 78 FR 38739 - Special Nuclear Material Control and Accounting Systems for Nuclear Power Plants

    Science.gov (United States)

    2013-06-27

    ... Systems for Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. ACTION: Regulatory guide; issuance... Guide (RG) 5.29, ``Special Nuclear Material Control and Accounting Systems for Nuclear Power Plants... material control and accounting. This guide applies to all nuclear power plants. ADDRESSES: Please refer to...

  5. China’s Nuclear Power Plants in Operation

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    Qinshan Plant Phase I Located in Haiyan,Zhejiang Province,Qinshan Nuclear Power Plant Phase I is t he first 300-megawatt pressurized water reactor (PWR) nuclear power plant independently designed,constructed,operated and managed by China.The plant came into commercial operation in April 1994.

  6. Commissioning of the nuclear power plant

    International Nuclear Information System (INIS)

    Furtado, P.M.; Rolf, F.

    1984-01-01

    Nuclear Power Plant Angra 2, located at Itaorna Beach-Angra dos Reis is the first plant of the Brazilian-German Agreement to be commissioned. The Nuclear Power Plant is a pressurized water reactor rated at 3765 Mw thermal/1325 Mw electrical. For commissioning purpose the plant is divided into 110 systems. Plant commissioning objective is to demonstrate the safe and correct operation of each plan component, system and of the whole plant in agreement with design conditions, licensing requirements and contractual obligations. This work gives a description of plant commissioning objectives, activities their time sequence, and documentation. (Author) [pt

  7. Partner of nuclear power plants

    International Nuclear Information System (INIS)

    Gribi, M.; Lauer, F.; Pauli, W.; Ruzek, W.

    1992-01-01

    Sulzer, the Swiss technology group, is a supplier of components and systems for nuclear power plants. Important parts of Swiss nuclear power stations, such as containments, reactor pressure vessels, primary pipings, are made in Winterthur. Sulzer Thermtec AG and some divisions of Sulzer Innotec focus their activities on servicing and backfitting nuclear power plants. The European market enjoys priority. New types of valves or systems are developed as economic solutions meeting more stringent criteria imposed by public authorities or arising from operating conditions. (orig.) [de

  8. The safety of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    1988-01-01

    Do nuclear power plants present an unjustifiable risk Can there be confidence in their safety The Uranium Institute invited a group of senior safety experts from eight different Western countries operating different types of reactors to provide an authoritative explanation for non-specialists of the basic principles of reactor safety, their application and their implications. The report presents the group's opinion on the level of safety achieved in the Western nuclear power plants with which the authors are directly familiar. Although many of the points made may well also be true for non-Western reactors, the report does not cover them except where specifically stated. It does describe and discuss the causes of the Chernobyl disaster. It does not compare nuclear power with other fuels, nor does it deal with its benefits, since however great the benefits from the peaceful use of nuclear power, and its own advantages over other fuels, they could not compensate for lack of safety. The conclusion reached is that the risk associated with electricity production at nuclear power plants can be kept very low. Proper use of the extensive knowledge available today can guarantee operation of nuclear power plants at very high safety levels, carrying very low risks, both to health and of contamination of the environment: risks that are continually lowered by upgrading existing plants and their operation, and by the design of future power plants. (author).

  9. Countermeasures to earthquakes in nuclear plants

    International Nuclear Information System (INIS)

    Sato, Kazuhide

    1979-01-01

    The contribution of atomic energy to mankind is unmeasured, but the danger of radioactivity is a special thing. Therefore in the design of nuclear power plants, the safety has been regarded as important, and in Japan where earthquakes occur frequently, the countermeasures to earthquakes have been incorporated in the examination of safety naturally. The radioactive substances handled in nuclear power stations and spent fuel reprocessing plants are briefly explained. The occurrence of earthquakes cannot be predicted effectively, and the disaster due to earthquakes is apt to be remarkably large. In nuclear plants, the prevention of damage in the facilities and the maintenance of the functions are required at the time of earthquakes. Regarding the location of nuclear plants, the history of earthquakes, the possible magnitude of earthquakes, the properties of ground and the position of nuclear plants should be examined. After the place of installation has been decided, the earthquake used for design is selected, evaluating live faults and determining the standard earthquakes. As the fundamentals of aseismatic design, the classification according to importance, the earthquakes for design corresponding to the classes of importance, the combination of loads and allowable stress are explained. (Kako, I.)

  10. Nuclear reactor kinetics and plant control

    CERN Document Server

    Oka, Yoshiaki

    2013-01-01

    Understanding time-dependent behaviors of nuclear reactors and the methods of their control is essential to the operation and safety of nuclear power plants. This book provides graduate students, researchers, and engineers in nuclear engineering comprehensive information on both the fundamental theory of nuclear reactor kinetics and control and the state-of-the-art practice in actual plants, as well as the idea of how to bridge the two. The first part focuses on understanding fundamental nuclear kinetics. It introduces delayed neutrons, fission chain reactions, point kinetics theory, reactivit

  11. Elecnuc. Nuclear power plants in the world. 1997

    International Nuclear Information System (INIS)

    Maubacq, F.; Tailland, C.

    1997-04-01

    This small booklet provides information about all type of nuclear power plants worldwide. It is based on the data taken from the CEA/DSE/SEE Elecnuc database. The content comprises: the 1996 highlights, the main characteristics of the different type of reactors in operation or under construction, the map of the French nuclear power plant sites, the worldwide status of nuclear power plants at the end of 1996, the nuclear power plants in operation, under construction or on order (by groups of reactor-types), the power capacity evolution of power plants in operation, the net and gross capacity of the power plants on the grid, the commercial operation and grid connection forecasts, the first achieved or expected power generation supplied by a nuclear reactor for each country and the power generation from nuclear reactors, the performance indicator of the PWR units in France, the trends of the power generation indicator worldwide, the nuclear power plants in operation, under construction, on order, planned, cancelled, decommissioned and exported worldwide, the schedule of steam generator replacements, and the MOX fuel plutonium recycling programme. (J.S.)

  12. Nuclear plant aging research program

    International Nuclear Information System (INIS)

    Eissenberg, D.M.

    1987-01-01

    The U.S. Nuclear Regulatory Commission, Office of Nuclear Regulatory Research, has established the Nuclear Plant Aging Research (NPAR) program in its Division of Engineering Technology. Principal contractors for this program include Oak Ridge National Laboratory, Brookhaven National Laboratory, Idaho National Engineering Laboratory, and Pacific Northwest Laboratory. The program goals are: to identify and characterize time-dependent degradation (aging) of nuclear plant safety-related electrical and mechanical components which could lead to loss of safety function; to identify and recommend methods for detecting and trending aging effects prior to loss of safety function so that timely maintenance can be implemented; and to recommend maintenance practices for mitigating the effects of aging. Research activities include prioritization of system and component aging in nuclear plants, characterization of aging degradation of specific components including identification of functional indicators useful for trending degradation, and testing of practical methods and devices for measuring the functional indicators. Aging assessments have been completed on electric motors, snubbers, motor-operated valves, and check valves. Testing of trending methods and devices for motor-operated valves and check valves is in progress

  13. Decommissioning and back working of Greifswald nuclear power plant

    International Nuclear Information System (INIS)

    Rittscher, D.; Leushacke, D.F.; Meyer, R.

    1998-01-01

    At Nuclear Power Plant Greifswald, the Energiewerke Nord are carrying out the presently world's largest decommissioning project. This requires the gathering up of experience from the operation of the nuclear power plants at Greifswald, the decommissioning of other nuclear power plants, waste management, project management and licensing procedures for the decommissioning of nuclear power plants. That confirmed that the back working of nuclear plants is not a technical problem but a challenge for project management and logistics. It shows that the dismantling and disposal of nuclear plants is an ordinary process in our economic life. (orig.) [de

  14. Increasing reliability of nuclear energy equipment and at nuclear power plants

    International Nuclear Information System (INIS)

    Ochrana, L.

    1997-01-01

    The Institute of Nuclear Energy at the Technical University in Brno cooperates with nuclear power plants in increasing their reliability. The teaching programme is briefly described. The scientific research programme of the Department of Heat and Nuclear Power Energy Equipment in the field of reliability is based on a complex systematic concept securing a high level of reliability. In 1996 the Department prepared a study dealing with the evaluation of the maintenance system in a nuclear power plant. The proposed techniques make it possible to evaluate the reliability and maintenance characteristics of any individual component in a nuclear power plant, and to monitor, record and evaluate data at any given time intervals. (M.D.)

  15. TVA's nuclear power plant experience

    International Nuclear Information System (INIS)

    Willis, W.F.

    1979-01-01

    This paper reviews TVA's nuclear power plant design and construction experience in terms of schedule and capital costs. The completed plant in commercial operation at Browns Ferry and six additional plants currently under construction represent the nation's largest single commitment to nuclear power and an ultimate investment of $12 billion by 1986. The presentation is made in three separate phases. Phase one will recapitulate the status of the nuclear power industry in 1966 and set forth the assumptions used for estimating capital costs and projecting project schedules for the first TVA units. Phase two describes what happened to the program in the hectic early 1979's in terms of expansion of scope (particularly for safety features), the dramatic increase in regulatory requirements, vendor problems, stretchout of project schedules, and unprecedented inflation. Phase three addresses the assumptions used today in estimating schedules and plant costs for the next ten-year period

  16. Academic training for nuclear power plant operators

    International Nuclear Information System (INIS)

    Jones, D.W.

    1982-01-01

    In view of the increasing emphasis being placed upon academic training of nuclear power plant operators, it is important that institutions of higher education develop and implement programs which will meet the educational needs of operational personnel in the nuclear industry. Two primary objectives must be satisfied by these programs if they are to be effective in meeting the needs of the industry. One objective is for academic quality. The other primary objective is for programs to address the specialized needs of the nuclear plant operator and to be relevant to the operator's job. The Center for Nuclear Studies at Memphis State University, therefore, has developed a total program for these objectives, which delivers the programs, and/or appropriate parts thereto, at ten nuclear plant sites and with other plants in the planning stage. The Center for Nuclear Studies program leads to a Bachelor of Professional Studies degree in nuclear industrial operations, which is offered through the university college of Memphis State University

  17. 78 FR 50458 - Entergy Nuclear Operations, Inc., James A. Fitzpatrick Nuclear Power Plant, Vermont Yankee...

    Science.gov (United States)

    2013-08-19

    ... Nuclear Operations, Inc., James A. Fitzpatrick Nuclear Power Plant, Vermont Yankee Nuclear Power Station... that the NRC take action with regard to James A. Fitzpatrick Nuclear Power Plant, Vermont Yankee.... Fitzpatrick Nuclear Power Plant (Fitzpatrick), Vermont Yankee Nuclear Power Station (Vermont Yankee), and...

  18. Cyber security issues imposed on nuclear power plants

    International Nuclear Information System (INIS)

    Kim, Do-Yeon

    2014-01-01

    Highlights: • Provide history of cyber attacks targeting at nuclear facilities. • Provide cyber security issues imposed on nuclear power plants. • Provide possible countermeasures for protecting nuclear power plants. - Abstract: With the introduction of new technology based on the increasing digitalization of control systems, the potential of cyber attacks has escalated into a serious threat for nuclear facilities, resulting in the advent of the Stuxnet. In this regard, the nuclear industry needs to consider several cyber security issues imposed on nuclear power plants, including regulatory guidelines and standards for cyber security, the possibility of Stuxnet-inherited malware attacks in the future, and countermeasures for protecting nuclear power plants against possible cyber attacks

  19. Nuclear power plant insurance - experience and loss statistics

    International Nuclear Information System (INIS)

    Feldmann, J.; Dangelmaier, P.

    1982-01-01

    Nuclear power plants are treated separately when concluding insurance contracts. National insurance pools have been established in industrial countries, co-operating on an international basis, for insuring a nuclear power plant. In combined property insurance, the nuclear risk is combined with the fire risk. In addition, there are the engineering insurances. Of these, the one of significance for nuclear power plants is the machinery insurance, which can be covered on the free insurance market. Nuclear power plants have had fewer instances of damage than other, conventional installations. (orig.) [de

  20. Energy forum 2005: Nuclear power - in competition with sustainable energy supply in Europe. Lectures

    International Nuclear Information System (INIS)

    2005-01-01

    The forum of energy for future organized on 29st September 2005 the annual Energy Forum at Berlin. The Energy Forum 2005 dealt with nuclear power in competition with sustainable energy supply in Europe and didn't only give their members the possibility of a discussion on this actual theme. Furtheron demanding aims on CO2-reduction, increased raw material- and energy prices as the construction of a new Finnish nuclear power plant have countries moved to evaluate again the future-oriented role of nuclear power. (orig./GL)

  1. Human factors in nuclear power plants

    International Nuclear Information System (INIS)

    Hennig, J.; Bohr, E.

    1976-04-01

    This annotated bibliography is a first attempt to give a survey of the kind of literature which is relevant for the ergonomic working conditions in nuclear power plants. Such a survey seems to be useful in view of the fact that the 'factor human being' comes recently more and more to the fore in nuclear power plants. In this context, the necessity is often pointed out to systematically include our knowledge of the performance capacity and limits of human beings when designing the working conditions for the personnel of nuclear power plants. For this reason, the bibliography is so much intended for the ergonomics experts as for the experts of nuclear engineering. (orig./LN) [de

  2. Implementing nuclear non-proliferation in Finland. Regulatory control, international cooperation and the Comprehensive Nuclear-Test-Ban Treaty. Annual report 2011

    Energy Technology Data Exchange (ETDEWEB)

    Okko, O [ed.

    2012-07-01

    The regulatory control of nuclear materials (i.e. nuclear safeguards) is a prerequisite for the peaceful use of nuclear energy in Finland. Safeguards are required for Finland to comply with international agreements on nuclear non-proliferation - mainly the Non-Proliferation Treaty (NPT). This regulatory control is exercised by the Nuclear Materials Section of the Finnish Radiation and Nuclear Safety Authority (STUK). The results of STUK's nuclear safeguards inspection activities in 2011 continued to demonstrate that the Finnish licence holders take good care of their nuclear materials. There were no indications of undeclared nuclear materials or activities and the inspected materials and activities were in accordance with the licence holders' declarations.

  3. 76 FR 40403 - R.E. Ginna Nuclear Power Plant, LLC, R.E. Ginna Nuclear Power Plant, R.E. Ginna Independent Spent...

    Science.gov (United States)

    2011-07-08

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-244; Docket No. 72-67] R.E. Ginna Nuclear Power Plant, LLC, R.E. Ginna Nuclear Power Plant, R.E. Ginna Independent Spent Fuel Storage Installation; Notice of... Facility Operating License No. DPR-18, for the R.E. Ginna Nuclear Power Plant (Ginna), currently held by R...

  4. Advancements in nuclear plant maintenance programs

    International Nuclear Information System (INIS)

    Meligi, A.E.; Maras, M.C.

    1993-01-01

    The viability of the nuclear option as a technology choice for present and future electricity generation will be decided primarily on the basis of operating cost to achieve plant performance objectives. In a nuclear plant, performance is judged not only on availability and output rate but also on safety risk and radiation exposure. Operating, cost is essentially made up of the fuel cost and operation and maintenance (O and M) cost. Over the past decade, the industry average nuclear plant performance has improved significantly; however, this improvement was accompanied by rising O and M cost. The net result was that the nuclear option lost its long-standing economic advantage over the coal option, based on the industry average comparison, around 1987 - with the gap narrowing slightly in the last 2 years. In recent times, gas-fired plants have also become a basis for comparison. The electric generation cost comparisons of various fuel options has led to even greater scrutiny of nuclear plant performance, with the poorer performing plants facing the risk of shutdown. While effective O and M programs improve plant performance, present industry data show that there is no direct correlation between the cost of a plant O and M program and its associated performance. There is a significant number of existing tools and techniques in the O and M area that have proved to be successful and have resulted in significant benefits and payback. This paper presents an overview of the nuclear industry efforts to improve the conduct of O and M activities, describes the basic elements of an effective O and M program, and addresses some of the state-of-the-art tools and techniques to enhance maintenance work planning, training, and procedures

  5. Emergency control centers for nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    Guidance is provided for the development and implementation of emergency control centers for nuclear power plants, including nuclear plant control room, nuclear plant company headquarters, emergency control center, and nuclear plant alternate emergency control center. Requirements and recommendations are presented for the mission, communications, instrumentation and equipment associated with each type of control center. Decisional aids, manning requirements and resources are also given; the decision aids cover both the accident assessment and protective action areas. Both normal and alternate means of communications are considered. Off-site emergency control centers, although not covered in the strict sense by this standard, are considered in an appendix

  6. SWOT of nuclear power plant sustainable development

    International Nuclear Information System (INIS)

    Abbaspour, M.; Ghazi, S.

    2008-01-01

    SWOT Analysis is a Useful tool that can he applied to most projects or business ventures. In this article we are going to examine major strengths, weaknesses, opportunities and threats of nuclear power plants in view of sustainable development. Nuclear power plants have already attained widespread recognition for its benefits in fossil pollution abatement, near-zero green house gas emission, price stability and security of energy supply. The impressive new development is that these virtues are now a cost -free bonus, because, in long run, nuclear energy has become an inexpensive way to generate electricity. Nuclear energy's pre-eminence economically and environmentally has two implications for government policy. First, governments should ensure that nuclear licensing and safety oversight arc not only rigorous but also efficient in facilitating timely development of advanced power plants. Second, governments should be bold incentivizing the transformation to clean energy economics, recognizing that such short-term stimulus will, in the case of nuclear plants, simply accelerate desirable changes that now have their own long-term momentum. The increased competitiveness of nuclear power plant is the result of cost reductions in all aspects of nuclear economics: Construction, financing, operations, waste management and decommissioning. Among the cost-lowering factors are the evolution to standardized reactor designs, shorter construction periods, new financing techniques, more efficient generation technologies, higher rates of reactor utilization, and longer plant lifetimes. U.S World Nuclear Association report shows that total electricity costs for power plant construction and operation were calculated at two interest rates. At 10%, midrange generating costs per kilowatt-hour are nuclear at 4 cents, coal at 4.7 cents and natural gas at 5.1 cent. At a 5% interest rate, mid-range costs per KWh fall to nuclear at 2.6 cents, coal at 3.7 cents and natural gas at 4.3 cents

  7. The Finnish "social wilderness"

    Science.gov (United States)

    Ville Hallikainen

    2000-01-01

    The cultural roots and images of the Finnish wilderness lie in its use as a source of livelihood practiced in southern and central Finland during the Middle Ages. There are statutory wilderness areas in Finland, but Finnish people consider many other areas as wilderness. It is important for management of the areas, statutory wilderness areas and the other wilderness-...

  8. Slovak Electric, plc, Mochovce Nuclear Power Plant

    International Nuclear Information System (INIS)

    1999-01-01

    In this popular scientific brochure a brief description of construction scheme of Bohunice Nuclear Power Plant is presented. Electricity generation in a nuclear power plant is described. Instrumentation and control system as well as nuclear safety principles applied on the NPP are presented

  9. Millstone nuclear power plant emergency system assessment

    International Nuclear Information System (INIS)

    Akhmad Khusyairi

    2011-01-01

    U.S.NRC determined an obligation to build a nuclear power plant emergency response organization for both on-site and off-site. Millstone Nuclear Power Plants have 3 nuclear reactors and 2 of 3 still in commercial operation. Reactor unit 1, BWR type has been permanently shut down in 1998, while the two others, units 2 and 3 obtain the extended operating license respectively until 2035 and 2045. As a nuclear installation has the high potential radiological impact, Millstone nuclear power plant emergency response organization must establish both on-site or off-site. Emergency response organization that is formed must involve several state agencies, both state agencies and municipality. They have specific duties and functions in a state of emergency, so that protective measures can be undertaken in accordance with the community that has been planned. Meanwhile, NRC conduct their own independent assessment of nuclear power plant emergencies. (author)

  10. Safety Assessment - Swedish Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Kjellstroem, B. [Luleaa Univ. of Technology (Sweden)

    1996-12-31

    After the reactor accident at Three Mile Island, the Swedish nuclear power plants were equipped with filtered venting of the containment. Several types of accidents can be identified where the filtered venting has no effect on the radioactive release. The probability for such accidents is hopefully very small. It is not possible however to estimate the probability accurately. Experiences gained in the last years, which have been documented in official reports from the Nuclear Power Inspectorate indicate that the probability for core melt accidents in Swedish reactors can be significantly larger than estimated earlier. A probability up to one in a thousand operating years can not be excluded. There are so far no indications that aging of the plants has contributed to an increased accident risk. Maintaining the safety level with aging nuclear power plants can however be expected to be increasingly difficult. It is concluded that the 12 Swedish plants remain a major threat for severe radioactive pollution of the Swedish environment despite measures taken since 1980 to improve their safety. Closing of the nuclear power plants is the only possibility to eliminate this threat. It is recommended that until this is done, quantitative safety goals, same for all Swedish plants, shall be defined and strictly enforced. It is also recommended that utilities distributing misleading information about nuclear power risks shall have their operating license withdrawn. 37 refs.

  11. Safety Assessment - Swedish Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kjellstroem, B.

    1996-01-01

    After the reactor accident at Three Mile Island, the Swedish nuclear power plants were equipped with filtered venting of the containment. Several types of accidents can be identified where the filtered venting has no effect on the radioactive release. The probability for such accidents is hopefully very small. It is not possible however to estimate the probability accurately. Experiences gained in the last years, which have been documented in official reports from the Nuclear Power Inspectorate indicate that the probability for core melt accidents in Swedish reactors can be significantly larger than estimated earlier. A probability up to one in a thousand operating years can not be excluded. There are so far no indications that aging of the plants has contributed to an increased accident risk. Maintaining the safety level with aging nuclear power plants can however be expected to be increasingly difficult. It is concluded that the 12 Swedish plants remain a major threat for severe radioactive pollution of the Swedish environment despite measures taken since 1980 to improve their safety. Closing of the nuclear power plants is the only possibility to eliminate this threat. It is recommended that until this is done, quantitative safety goals, same for all Swedish plants, shall be defined and strictly enforced. It is also recommended that utilities distributing misleading information about nuclear power risks shall have their operating license withdrawn. 37 refs

  12. Finnish bioenergy research programme

    Energy Technology Data Exchange (ETDEWEB)

    Asplund, D. [VTT Energy, Jyvaeskylae (Finland)

    1996-12-31

    Finland is a leading country in the use of biofuels and has excellent opportunities to increase the use of biofuels by up to 25-30 %. The Finnish Government has set an objective for the promotion of bioenergy. The aim is to increase the use of bioenergy by about 25 % from the present level by 2005, and the increment corresponds to 1.5 million tonnes of oil equivalent (toe) per year. The R and D work has been considered as an important factor to achieve this ambitious goal. Energy research was organised into a series of research programmes in 1988 in accordance with the proposal of Finnish Energy Research Committee. The object of the research programmes is to enhance research activities and to bundle individual projects together into larger research packages. The common target of the Finnish energy research programmes is to proceed from basic and applied research to product development and pilot operation, and after that to the first commercial applications, e.g. demonstrations. As the organisation of energy research to programmes has led to good results, the Finnish Ministry of Trade and Industry decided to go on with this practice by launching new six-year programmes in 1993-1998. One of these programmes is the Bioenergy Research Programme and the co-ordination of this programme is carried out by VTT Energy. Besides VTT Energy the Finnish Forest Research Institute, Work Efficiency Institute, Metsaeteho and University of Joensuu are participating in the programme 7 refs.

  13. Finnish bioenergy research programme

    Energy Technology Data Exchange (ETDEWEB)

    Asplund, D [VTT Energy, Jyvaeskylae (Finland)

    1997-12-31

    Finland is a leading country in the use of biofuels and has excellent opportunities to increase the use of biofuels by up to 25-30 %. The Finnish Government has set an objective for the promotion of bioenergy. The aim is to increase the use of bioenergy by about 25 % from the present level by 2005, and the increment corresponds to 1.5 million tonnes of oil equivalent (toe) per year. The R and D work has been considered as an important factor to achieve this ambitious goal. Energy research was organised into a series of research programmes in 1988 in accordance with the proposal of Finnish Energy Research Committee. The object of the research programmes is to enhance research activities and to bundle individual projects together into larger research packages. The common target of the Finnish energy research programmes is to proceed from basic and applied research to product development and pilot operation, and after that to the first commercial applications, e.g. demonstrations. As the organisation of energy research to programmes has led to good results, the Finnish Ministry of Trade and Industry decided to go on with this practice by launching new six-year programmes in 1993-1998. One of these programmes is the Bioenergy Research Programme and the co-ordination of this programme is carried out by VTT Energy. Besides VTT Energy the Finnish Forest Research Institute, Work Efficiency Institute, Metsaeteho and University of Joensuu are participating in the programme 7 refs.

  14. Preliminary regulatory assessment of nuclear power plants vulnerabilities

    International Nuclear Information System (INIS)

    Kostadinov, V.; Petelin, S.

    2004-01-01

    Preliminary attempts to develop models for nuclear regulatory vulnerability assessment of nuclear power plants are presented. Development of the philosophy and computer tools could be new and important insight for management of nuclear operators and nuclear regulatory bodies who face difficult questions about how to assess the vulnerability of nuclear power plants and other nuclear facilities to external and internal threats. In the situation where different and hidden threat sources are dispersed throughout the world, the assessment of security and safe operation of nuclear power plants is very important. Capability to evaluate plant vulnerability to different kinds of threats, like human and natural occurrences and terrorist attacks and preparation of emergency response plans and estimation of costs are of vital importance for assurance of national security. On the basis of such vital insights, nuclear operators and nuclear regulatory bodies could plan and optimise changes in oversight procedures, organisations, equipment, hardware and software to reduce risks taking into account security and safety of nuclear power plants operation, budget, manpower, and other limitations. Initial qualitative estimations of adapted assessments for nuclear applications are shortly presented. (author)

  15. Big data in Finnish financial services

    OpenAIRE

    Laurila, M. (Mikko)

    2017-01-01

    Abstract This thesis aims to explore the concept of big data, and create understanding of big data maturity in the Finnish financial services industry. The research questions of this thesis are “What kind of big data solutions are being implemented in the Finnish financial services sector?” and “Which factors impede faster implementation of big data solutions in the Finnish financial services sector?”. ...

  16. Methods for sharing tacit nuclear knowledge and expertise

    International Nuclear Information System (INIS)

    Hyttinen, L.; Rintala, N.

    2004-01-01

    The ageing of workforce, the lack of training programs and recruits, and the decline in R and D activities have evoked discussion about the need to preserve nuclear knowledge by transferring it from retiring experts to new recruits. Studies conducted in the nuclear and power industries have found that challenges lie especially in transferring tacit knowledge, which the experts have accumulated through long careers and various experiences in professional settings. This paper examines methods with which tacit knowledge is transferred at the Finnish nuclear power plants. The aim of this paper is to provide empirical knowledge of the current state of practices for sharing tacit knowledge that could be utilized at NPPs more generally. (author)

  17. Methods for sharing tacit nuclear knowledge and expertise

    International Nuclear Information System (INIS)

    Rintala, N.; Hyttinen, L.

    2006-01-01

    The ageing of workforce, the lack of training programmes and recruitments, and the decline in R and D activities have prompted discussions about the need to preserve nuclear knowledge by transferring it from retiring experts to new recruits. Studies conducted in the nuclear and power industries have found that challenges lie especially in transferring tacit knowledge, which the experts have accumulated over the course of long careers and various experiences in professional settings. This paper examines methods by which tacit knowledge is transferred at the Finnish nuclear power plants. The aim of this paper is to provide empirical knowledge of the current state of practices for sharing tacit knowledge that could be utilised at NPPs more generally. (author)

  18. Loviisa nuclear power plant analyzer

    International Nuclear Information System (INIS)

    Porkholm, K.; Nurmilaukas, P.; Tiihonen, O.; Haenninen, M.; Puska, E.

    1992-12-01

    The APROS Simulation Environment has been developed since 1986 by Imatran Voima Oy (IVO) and the Technical Research Centre of Finland (VTT). It provides tools, solution algorithms and process components for use in different simulation systems for design, analysis and training purposes. One of its main nuclear applications is the Loviisa Nuclear Power Plant Analyzer (LPA). The Loviisa Plant Analyzer includes all the important plant components both in the primary and in the secondary circuits. In addition, all the main control systems, the protection system and the high voltage electrical systems are included. (orig.)

  19. I and C upgrading at nuclear power plants

    International Nuclear Information System (INIS)

    Tamiri, A.

    2003-01-01

    Continuing the operation of existing nuclear power plants will help reduce the number of new base-load nuclear and fossil power plants that need to be built. Old nuclear power plants in Canada are operating with analog instrumentation and control systems. For a number of reasons, such as changes and improvements in the applicable standards and design, maintenance problems due to the lack of spares, technical obsolescence, the need to increase power production, availability, reliability and safety, and in order to reduce operation and maintenance costs, instrumentation and control upgrading at nuclear power plants in a cost effective manner should be considered the greatest priority. Failures of instrumentation and control (I and C) due to aging and obsolescence issues may have an immediate negative impact on plant reliability and availability and also affect long-term plant performance and safety. In today's competitive marketplace, power plants are under pressure to cut spending on maintenance while reducing the risk of equipment failure that could cause unplanned outage. To improve plant safety and availability, old nuclear power plants will require investment in new technologies that can improve the performance and reduce the costs of generation by addressing the long term reliability of systems by up-grading to modem digital instrumentation and control and optimization opportunities. Boiler drum level control at nuclear power plants is critical for both plant protection and equipment safety and applies equality to high and low levels of water within the boiler drum. Plant outage studies at Pickering Nuclear have identified boiler drum level control and feed water control systems as major contributors to plant unavailability. Ways to improve transient and steady state response, upgrading existing poor analog control systems for boiler level and feed-water control systems at Pickering Nuclear, with enhanced and robust controller will be discussed in this paper

  20. Seismic reevaluation of existing nuclear power plants

    International Nuclear Information System (INIS)

    Hennart, J.C.

    1978-01-01

    The codes and regulations governing Nuclear Power Plant seismic analysis are continuously becoming more stringent. In addition, design ground accelerations of existing plants must sometimes be increased as a result of discovery of faulting zones or recording of recent earthquakes near the plant location after plant design. These new factors can result in augmented seismic design criteria. Seismic reanalysius of the existing Nuclear Power Plant structures and equipments is necessary to prevent the consequences of newly postulated accidents that could cause undue risk to the health or safety of the public. This paper reviews the developments of seismic analysis as applied to Nuclear Power Plants and the methods used by Westinghouse to requalify existing plants to the most recent safety requirements. (author)

  1. Robotics for nuclear power plants

    International Nuclear Information System (INIS)

    Shiraiwa, Takanori; Watanabe, Atsuo; Miyasawa, Tatsuo

    1984-01-01

    Demand for robots in nuclear power plants is increasing of late in order to reduce workers' exposure to radiations. Especially, owing to the progress of microelectronics and robotics, earnest desire is growing for the advent of intellecturized robots that perform indeterminate and complicated security work. Herein represented are the robots recently developed for nuclear power plants and the review of the present status of robotics. (author)

  2. Robotics for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Shiraiwa, Takanori; Watanabe, Atsuo; Miyasawa, Tatsuo

    1984-10-01

    Demand for robots in nuclear power plants is increasing of late in order to reduce workers' exposure to radiations. Especially, owing to the progress of microelectronics and robotics, earnest desire is growing for the advent of intellecturized robots that perform indeterminate and complicated security work. Herein represented are the robots recently developed for nuclear power plants and the review of the present status of robotics.

  3. Nuclear Power Plant Technician

    Science.gov (United States)

    Randall, George A.

    1975-01-01

    The author recognizes a body of basic knowledge in nuclear power plant technoogy that can be taught in school programs, and lists the various courses, aiming to fill the anticipated need for nuclear-trained manpower--persons holding an associate degree in engineering technology. (Author/BP)

  4. Plant life extensions for German nuclear power plants? Controversial discussion profit taking of nuclear power plant operators

    International Nuclear Information System (INIS)

    Matthes, Felix C.

    2009-10-01

    The discussion on the plant life extensions for German nuclear power plants beyond the residual quantity of electricity particularly focus on three aspects: Effects for the emission of carbon dioxide as a greenhouse gas; Development of the electricity price for which a reduction or attenuation is postulated due to a plant life extension; Skimming of additional profits at operating companies and their use in the safeguarding of the future (development of renewable energies, support of energy efficiency, promotion of the research, consolidation of the public budget, and so on). Under this aspect, the author of the contribution under consideration reports on the profit taking of nuclear power plant operators. The presented analysis considers three aspects: (a) Specification of the quantity structures for the investigated model of plant life extension; (b) The decisive parameter is the revenue situation and thus the price development for electricity at wholesale markets; (c) Determination and evaluation of the course in time of the profit taking.

  5. Some viewpoints on reference biospheres in Finnish performance assessments

    International Nuclear Information System (INIS)

    Rasilainen, K.; Kattilakoski, E.; Suolanen, V.; Vieno, T.; Vuori, S.

    2002-01-01

    Viewpoints are presented concerning biosphere studies in performance assessments of nuclear waste disposal. The points are based on experiences from several Finnish performance assessments. The latest performance assessment for spent fuel disposal, TILA-99, was considered in the Decision in Principle process for the site selection of the repository. The points given are also based on experiences from participation in international projects dealing with biosphere modelling, for instance BIOMOVS and BIOMASS. (author)

  6. Maintenance planning for nuclear power plants

    International Nuclear Information System (INIS)

    Mattu, R.K.; Cooper, S.E.; Lauderdale, J.R.

    2004-01-01

    Maintenance planning for nuclear power plants is similar to that in other industrial plants but it is heavily influenced by regulatory rules, with consequent costs of compliance. Steps by the nuclear industry and the Nuclear Regulatory Commission to address that problem include development of guidelines for maintenance of risk-critical equipment, using PRA-based techniques to select a set of equipment that requires maintenance and reliability-centered maintenance (RCM) approaches for determining what maintenance is required. The result of the process is a program designed to ensure effective maintenance of the equipment most critical to plant safety. (author)

  7. Safety assessment principles for nuclear plants

    International Nuclear Information System (INIS)

    1992-01-01

    The present Safety Assessment Principles result from the revision of those which were drawn up following a recommendation arising from the Sizewell-B enquiry. The principles presented here relate only to nuclear safety; there is a section on risks from normal operation and accident conditions and the standards against which those risks are assessed. A major part of the document deals with the principles that cover the design of nuclear plants. The revised Safety assessment principles are aimed primarily at the safety assessment of new nuclear plants but they will also be used in assessing existing plants. (UK)

  8. Qualification of nuclear power plant operations personnel

    International Nuclear Information System (INIS)

    1984-01-01

    With the ultimate aim of reducing the possibility of human error in nuclear power plant operations, the Guidebook discusses the organizational aspects, the staffing requirements, the educational systems and qualifications, the competence requirements, the ways to establish, preserve and verify competence, the specific aspects of personnel management and training for nuclear power plant operations, and finally the particular situations and difficulties to be overcome by utilities starting their first nuclear power plant. An important aspect presented in the Guidebook is the experience in training and qualification of nuclear power plant personnel in various countries: Argentina, Belgium, Canada, Czechoslovakia, France, Federal Republic of Germany, Spain, Sweden, United Kingdom and United States of America

  9. Modifications to nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2004-01-01

    This Safety Guide was prepared under the IAEA's programme for safety standards for nuclear power plants. It supplements Section 7 of the Safety Requirements publication on Safety of Nuclear Power Plants: Operation, which establishes the safety requirements for the modification of nuclear power plants. Reasons for carrying out modifications to nuclear power plants may include: (1) maintaining or strengthening existing safety provisions and thus maintaining consistency with or improving on the current design. (2) recovering from plant faults. (3) improving the thermal performance or increasing the power rating of the plant. (4) increasing the maintainability of the plant, reducing the radiation exposure of personnel or reducing the costs of plant maintenance. And (5) extending the design life of the plant. Most modifications, made on the basis of operating experience, are intended to improve on the design or to improve operational performance and flexibility. Some are rendered necessary by new regulatory requirements, ageing of the plant or obsolescence of equipment. However, the benefits of regularly updating the plant design can be jeopardized if modifications are not kept under rigorous control throughout the lifetime of the plant. The need to reduce costs and improve efficiency, in combination with changes to the structure of the electricity generation sector of the economy in many countries, has led many companies to make changes in the structure of the operating organization for nuclear power plants. Whatever the reason for such organizational changes, consideration should be given to the effects of those changes with the aim of ensuring that they would have no impacts that would compromise the safety of the plant. The objective of this Safety Guide is to provide guidance and recommendations on controlling activities relating to modifications at nuclear power plants in order to reduce risk and to ensure that the configuration of the plant is at all times under

  10. Modifications to nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2007-01-01

    This Safety Guide was prepared under the IAEA's programme for safety standards for nuclear power plants. It supplements Section 7 of the Safety Requirements publication on Safety of Nuclear Power Plants: Operation, which establishes the safety requirements for the modification of nuclear power plants. Reasons for carrying out modifications to nuclear power plants may include: (1) maintaining or strengthening existing safety provisions and thus maintaining consistency with or improving on the current design. (2) recovering from plant faults. (3) improving the thermal performance or increasing the power rating of the plant. (4) increasing the maintainability of the plant, reducing the radiation exposure of personnel or reducing the costs of plant maintenance. And (5) extending the design life of the plant. Most modifications, made on the basis of operating experience, are intended to improve on the design or to improve operational performance and flexibility. Some are rendered necessary by new regulatory requirements, ageing of the plant or obsolescence of equipment. However, the benefits of regularly updating the plant design can be jeopardized if modifications are not kept under rigorous control throughout the lifetime of the plant. The need to reduce costs and improve efficiency, in combination with changes to the structure of the electricity generation sector of the economy in many countries, has led many companies to make changes in the structure of the operating organization for nuclear power plants. Whatever the reason for such organizational changes, consideration should be given to the effects of those changes with the aim of ensuring that they would have no impacts that would compromise the safety of the plant. The objective of this Safety Guide is to provide guidance and recommendations on controlling activities relating to modifications at nuclear power plants in order to reduce risk and to ensure that the configuration of the plant is at all times under

  11. Occupational dose control in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Viktorsson, C.; Lochard, J.; Benedittini, M.; Baum, J.; Khan, T.A.

    1990-01-01

    Reduction in occupational exposure at nuclear power plants is desirable not only in the interest of the health and safety of plant personnel, but also because it enhances the safety and reliability of the plants. This report summarises the current trends of doses to workers at nuclear power plants and the achievements and developments regarding methods for their reduction

  12. Economics and policies of nuclear plant life management

    International Nuclear Information System (INIS)

    Yamagata, H.

    1998-01-01

    NEA provides an opportunity for international exchange of information on the economics and policies of nuclear plant life management for governments and plant owners. The NEA Secretariat is finalising the 'state-of-the-art report' on the economics and policies of nuclear plant life management, including the model approach and national summaries. In order to meet power supply obligations in the early 2000, taking into account energy security, environmental impact, and the economics of nuclear power plants whose lives have been extended, initiatives at national level must be taken to monitor, co-ordinate, and support the various industry programmes of nuclear plant life management by integrated and consistent policies, public acceptance, R and D, and international co-operation. Nuclear power owners should establish an organisation and objectives to carry nuclear plant life management in the most economic and smoothest way taking into consideration internal and external influences. The organisation must identify the critical item and the ageing processes, and optimise equipment reliability and maintenance workload. (author)

  13. German risk study 'nuclear power plants, phase B'

    International Nuclear Information System (INIS)

    Heuser, F.W.

    1989-01-01

    The results of the German risk study 'Nuclear power plants, phase B' indicate that an accident in a nuclear power plant which cannot be managed by the safety systems according to design, is extremely improbable: Its probability is at about 3 to 100,000 per year and plant. Even if the safety systems fail, emergency measures can be effected in a nuclear power plant to prevent an accident. These in-plant emergency measures diminish the probability of a core meltdown to about 4 to 1,000,000 per year and plant. Hence, the accident risk is greatly reduced. The information given by the author are to smooth the emotional edge in the discussion about the safety of nuclear power plants. (orig.) [de

  14. Nuclear power plant decommissioning

    International Nuclear Information System (INIS)

    Yaziz Yunus

    1986-01-01

    A number of issues have to be taken into account before the introduction of any nuclear power plant in any country. These issues include reactor safety (site and operational), waste disposal and, lastly, the decommissioning of the reactor inself. Because of the radioactive nature of the components, nuclear power plants require a different approach to decommission compared to other plants. Until recently, issues on reactor safety and waste disposal were the main topics discussed. As for reactor decommissioning, the debates have been academic until now. Although reactors have operated for 25 years, decommissioning of retired reactors has simply not been fully planned. But the Shippingport Atomic Power Plant in Pennysylvania, the first large scale power reactor to be retired, is now being decommissioned. The work has rekindled the debate in the light of reality. Outside the United States, decommissioning is also being confronted on a new plane. (author)

  15. Nuclear power plant outage optimisation strategy

    International Nuclear Information System (INIS)

    2002-10-01

    Competitive environment for electricity generation has significant implications for nuclear power plant operations, including among others the need of efficient use of resources, effective management of plant activities such as on-line maintenance and outages. Nuclear power plant outage management is a key factor for good, safe and economic nuclear power plant performance which involves many aspects: plant policy, co-ordination of available resources, nuclear safety, regulatory and technical requirements and, all activities and work hazards, before and during the outage. This technical publication aims to communicate these practices in a way they can be used by operators and utilities in the Member States of the IAEA. It intends to give guidance to outage managers, operating staff and to the local industry on planning aspects, as well as examples and strategies experienced from current plants in operation on the optimization of outage period. This report discusses the plant outage strategy and how this strategy is actually implemented. The main areas identified as most important for outage optimization by the utilities and government organizations participating in this report are: organization and management; outage planning and preparation, outage execution, safety outage review, and counter measures to avoid extension of outages and to easier the work in forced outages. This report was based on discussions and findings by the authors of the annexes and the participants of an Advisory Group Meeting on Determinant Causes for Reducing Outage Duration held in June 1999 in Vienna. The report presents the consensus of these experts regarding best common or individual good practices that can be used at nuclear power plants with the aim to optimize

  16. Nuclear regulation. License renewal questions for nuclear plants need to be resolved

    International Nuclear Information System (INIS)

    Fultz, Keith O.; Kruslicky, Mary Ann; McDowell, William D. Jr.; Coleman, Robert L.

    1989-04-01

    A December 1986 pipe rupture at Virginia Power's Surry unit 2 nuclear power plant injured eight workers; four later died. As a result of this accident, Representative Edward J. Markey requested GAO to examine the Surry accident and assess the problems confronting aging nuclear plants. In March 1988 we reported our findings concerning the accident and a July 1987 incident at the Trojan nuclear plant in Oregon. This report addresses problems confronting aging nuclear plants by examining the Nuclear Regulatory Commission's (NRC) program to develop a license renewal policy and accompanying regulations, and the initiatives underway by the Department of Energy (DOE) and the electric utility industry to extend the operating lives of these plants. Nuclear power has become second only to coal as the largest producer of electricity in the United States. The 110 nuclear plants currently in service are operated by 54 utilities, provide about 20 percent of the nation's electricity, and represent a capital investment of over $200 billion. The Atomic Energy Act authorizes NRC to issue nuclear plant operating licenses for up to 40 years and provides for license extensions beyond the initial operating period. The act does not, however, stipulate the criteria for evaluating a utility request to operate a nuclear plant longer than 40 years. The oldest operating license currently in effect will expire in the year 2000. According to NRC, about one-half of the existing operating licenses will terminate by the year 2015, and most licenses will expire by about 2030. Many utilities will have to decide in the early 1990s whether to continue operating older nuclear plants or to construct new generating capacity. A clear understanding of the terms and conditions governing the license renewal process will be a key element in deciding how to meet future electricity demand. Although NRC has developed 3 possible license renewal policy options and identified 15 areas of regulatory uncertainty that

  17. Plant designer's view of the operator's role in nuclear plant safety

    International Nuclear Information System (INIS)

    Corcoran, W.R.; Church, J.F.; Cross, M.T.; Porter, N.J.

    1981-01-01

    The nuclear plant operator's role supports the design assumptions and equipment with four functional tasks. He must set up th plant for predictable response to disturbances, operate the plant so as to minimize the likelihood and severity of event initiators, assist in accomplishing the safety functions, and feed back operating experiences to reinforce or redefine the safety analyses' assumptions. The latter role enhances the operator effectiveness in the former three roles. The Safety Level Concept offers a different perspective that enables the operator to view his roles in nuclear plant safety. This paper outlines the operator's role in nuclear safety and classifies his tasks using the Safety Level Concept

  18. Plant life extensions for German nuclear power plants? Controversial discussion on potential electricity price effects

    International Nuclear Information System (INIS)

    Matthes, Felix C.; Hermann, Hauke

    2009-06-01

    The discussions on electricity price effects in case of the plant life extension of German nuclear power plants covers the following topics: (1) Introduction and methodology. (2) Electricity generation in nuclear power plants and electricity price based on an empirical view: electricity generation in nuclear power plants and final consumption price for households and industry in the European Union; electricity generation in nuclear power plants and electricity wholesale price in case of low availability of nuclear power plants in Germany; comparison of electricity wholesale prices in Germany and France. (3) Model considerations in relation to electricity prices and nuclear phase-out. (4) Concluding considerations.

  19. Robotics for nuclear power plants

    International Nuclear Information System (INIS)

    Nakayama, Ryoichi; Kimura, Motohiko; Abe, Akira

    1993-01-01

    A continuing need exists for automatic or remote-controlled machines or robots which can perform inspection and maintenance tasks in nuclear power plants. Toshiba has developed several types of monofunctional and multi- functional robots for such purposes over the past 20 years, some of which have already been used in actual plants. This paper describes new multifunctional robots for inspection and maintenance. An inspection robot has been applied in an actual plant for two years for performance testing. Maintenance robots for grinding tasks have also been developed, which can be easily teleoperated by the operator using automatic control. These new robots are expected to be applied to actual inspection and maintenance work in nuclear power plants. (author)

  20. Radiation risk in Finland due to the nuclear power plant at Sosnovyj Bor

    International Nuclear Information System (INIS)

    Ilvonen, M.; Rossi, J.; Salonoja, M.

    1994-06-01

    The present study is an application of the long range transport and dose model TRADOS developed jointly by the Finnish Meteorological Institute and Technical Research Centre of Finland. The aim of the study is to assess the radiation risk in Finland due to the nuclear power plant at Sosnovyj Bor near St. Petersburg in Russia. Probabilities of reaching different parts of the country, transport time and time spent over Finland by the trajectories are presented. Also breadth of the radioactive cloud and incidence of rain are estimated. The calculated radiation doses are based on one single hypothetical release, in which all noble gases are released, together with 10 % of easily vaporizing elements and 1 % of others. All results are based on the assumption that the probability of the release is 100 %. The dose pathways calculated are cloud gamma, fallout gamma, inhalation, and ingestion of milk, meat, green vegetables, grain and roots. External dose rates have been calculated. The necessity of countermeasures and the ratio of the avertable dose to the costs are also assessed. (13 refs., 156 figs., 12 tabs.)

  1. Affective imagery and acceptance of replacing nuclear power plants.

    Science.gov (United States)

    Keller, Carmen; Visschers, Vivianne; Siegrist, Michael

    2012-03-01

    This study examined the relationship between the content of spontaneous associations with nuclear power plants and the acceptance of using new-generation nuclear power plants to replace old ones. The study also considered gender as a variable. A representative sample of the German- and French-speaking population of Switzerland (N= 1,221) was used. Log-linear models revealed significant two-way interactions between the association content and acceptance, association content and gender, and gender and acceptance. Correspondence analysis revealed that participants who were opposed to nuclear power plants mainly associated nuclear power plants with risk, negative feelings, accidents, radioactivity, waste disposal, military use, and negative consequences for health and environment; whereas participants favoring nuclear power plants mainly associated them with energy, appearance descriptions of nuclear power plants, and necessity. Thus, individuals opposing nuclear power plants had both more concrete and more diverse associations with them than people who were in favor of nuclear power plants. In addition, participants who were undecided often mentioned similar associations to those participants who were in favor. Males more often expressed associations with energy, waste disposal, and negative health effects. Females more often made associations with appearance descriptions, negative feelings, and negative environmental effects. The results further suggest that acceptance of replacing nuclear power plants was higher in the German-speaking part of the country, where all of the Swiss nuclear power plants are physically located. Practical implications for risk communication are discussed. © 2011 Society for Risk Analysis.

  2. Human factors in nuclear power plants

    International Nuclear Information System (INIS)

    Swain, A.D.

    1981-01-01

    This report describes some of the human factors problems in nuclear power plants and the technology that can be employed to reduce those problems. Many of the changes to improve the human factors in existing plants are inexpensive, and the expected gain in human reliability is substantial. The human factors technology is well-established and there are practitioners in most countries that have nuclear power plants. (orig.) [de

  3. ALARA at nuclear power plants

    International Nuclear Information System (INIS)

    Baum, J.W.

    1991-01-01

    Implementation of the ALARA principle at nuclear power plants presents a continuing challenge for health physicists at utility corporate and plant levels, for plant designers, and for regulatory agencies. The relatively large collective doses at some plants are being addressed through a variety of dose reduction techniques. Initiatives by the ICRP, NCRP, NRC, INPO, EPRI, and BNL ALARA Center have all contributed to a heightened interest and emphasis on dose reduction. The NCRP has formed Scientific Committee 46-9 which is developing a report on ALARA at Nuclear Power Plants. It is planned that this report will include material on historical aspects, management, valuation of dose reduction ($/person-Sv), quantitative and qualitative aspects of optimization, design, operational considerations, and training. The status of this work is summarized in this report

  4. Finnish EPR Olkiluoto 3. The world's first third-generation reactor now under construction

    International Nuclear Information System (INIS)

    2007-01-01

    The EPR was developed by Framatome and Siemens KWU (the nuclear division of Siemens), whose nuclear activities were combined in January 2001 to form Framatome ANP, now AREVA NP. The French electricity utility EDF (Electricite de France), together with the major German utilities, played an active role in the project. The safety authorities of the two countries joined forces to bring their respective safety standards into line and draw up joint design rules for the new reactor. On December 18, 2003, the consortium formed by AREVA and Siemens - and led by AREVA - signed a contract with TVO for the turnkey construction of the EPR. The overall Olkiluoto 3 project cost has been estimated by TVO at around euros 3 Billion. TVO is responsible for the overall project management and licensing process with the Finnish Safety Authority STUK. In the pre-qualification phase, STUK concluded that the EPR can meet the Finnish licensing requirements. All specific comments will be taken into account for the realization of the project. In January 2005, STUK emphasized in its safety assessment that the evolutionary EPR design compared to predecessor product lines has been further enhanced by AREVA. This paper presents first, The Finnish energy situation (Electricity consumption and supply, Finland's Kyoto CO 2 cutback, Competitiveness of nuclear power), and then the EPR in Olkiluoto (General schedule of responsibilities, Important milestones of the project). Finally, the EPR third-generation and advanced reactor is presented with its position in the international competition (Targeted design objectives, Main characteristics, competitiveness, safety, Additional measures to prevent the occurrence of events likely to damage the core, Increased protection against the consequences of core melt)

  5. A common high standard for nuclear power plant exports: overview and analysis of the Nuclear Power Plant Exporters' Principles of Conduct

    International Nuclear Information System (INIS)

    Perkovich, George; Radzinsky, Brian

    2012-01-01

    At this time, there is no overarching global framework to regulate the development of the nuclear power industry. Laws concerning the export of nuclear technology vary across jurisdictions, and politically-binding arrangements such as the Nuclear Suppliers Group (NSG) help ensure that weapons-usable or dual-use technologies are not exported, but no single international regime or agreement manages the gamut of potential risks that may arise from the export of civilian nuclear power plants. Accordingly in 2008, the Carnegie Endowment for International Peace convened internationally-recognised experts in nuclear energy to begin a dialogue with nuclear power plant vendors about defining common criteria for the socially responsible export of nuclear power plants. The goal was to articulate a comprehensive set of principles and best practices that would raise the overall standard of practice for exports of nuclear power plants while enjoying widespread support and adherence. The outcome of this process is the Nuclear Power Plant Exporters' Principles of Conduct - an export-oriented code of conduct for nuclear power plant vendors. The Principles of Conduct help ensure that the participating companies will proceed with the sale of a new nuclear power plant only after a careful assessment of the legal, political, and technical contexts surrounding potential customers. It comprises six 'principles' that each address a major area of concern involved in the export of a nuclear power plant: safety, physical security, environmental protection and spent fuel management, systems of compensation for nuclear damage, non-proliferation and safeguards, and business ethics. The Principles of Conduct entail vendor responsibilities to apply specific standards or engage in certain practices before signing contracts and during the marketing and construction phases of a nuclear power plant export project. Conformity with the Principles of Conduct is voluntary and not-legally binding, but the

  6. Nuclear power. Europe report

    International Nuclear Information System (INIS)

    Anon.

    2002-01-01

    Last year, 2001, nuclear power plants were available for energy supply, respectively, in 18 countries all over Europe. In 8 of the 15 member countries of the European Union nuclear power plants have been in operation. In 7 of the 13 EU Candidate Countries nuclear energy was used for power production. A total of 216 plants with an aggregate net capacity of 171 802 MWe and an aggregate gross capacity of 181 212 MWe were in operation. One unit, i.e. Volgodonsk-1 in Russia went critical for the first time and started test operation after having been connected to the grid. Volgodonsk-1 adds about 1 000 MWe (gross) nd 953 MWe (net) to the electricity production capacity. The operator of the Muehlheim-Kaerlich NPP field an application to decommission and dismantle the plant; this plant was only 13 months in operation and has been shut down since 1988 for legal reasons. Last year, 10 plants were under construction in Romania (1), Russia (4), Slovakia (2), the Czech Republic (1) and the Ukraine (2), that is only in East European Countries. In eight countries of the European Union 143 nuclear power plants have been operated with an aggregate gross capacity of 128 758 MWe and an aggregate net capacity of 122 601 MWe. Net electricity production in 2001 in the EU amounts to approx. 880.3 TWh gross, which means a share of 33,1 per cent of the total production in the whole EU. Shares of nuclear power differ widely among the operator countries. The reach 75.6% in France, 74.2% in Lithuania, 58.2% in Belgium, 53.2% in the Slovak Republic, and 47.4% in the Ukraine. Nuclear power also provides a noticeable share in the electricity supply of countries, which operate no own nuclear power plants, e.g. Italy, Portugal, and Austria. On May 24th, 2002 the Finnish Parliament voted for the decision in principle to build a fifth nuclear power plant in the country. This launches the next stage in the nuclear power plant project. The electric output of the plant unit will be 1000-1600 MW

  7. Nuclear plant license renewal

    International Nuclear Information System (INIS)

    Gazda, P.A.; Bhatt, P.C.

    1991-01-01

    During the next 10 years, nuclear plant license renewal is expected to become a significant issue. Recent Electric Power Research Institute (EPRI) studies have shown license renewal to be technically and economically feasible. Filing an application for license renewal with the Nuclear Regulatory Commission (NRC) entails verifying that the systems, structures, and components essential for safety will continue to perform their safety functions throughout the license renewal period. This paper discusses the current proposed requirements for this verification and the current industry knowledge regarding age-related degradation of structures. Elements of a license renewal program incorporating NRC requirements and industry knowledge including a schedule are presented. Degradation mechanisms for structural components, their significance to nuclear plant structures, and industry-suggested age-related degradation management options are also reviewed

  8. Implementing nuclear non-proliferation in Finland. Regulatory control, international cooperation and the Comprehensive Nuclear-Test-Ban Treaty. Annual report 2011

    Energy Technology Data Exchange (ETDEWEB)

    Okko, O. (ed.)

    2012-07-01

    The regulatory control of nuclear materials (i.e. nuclear safeguards) is a prerequisite for the peaceful use of nuclear energy in Finland. Safeguards are required for Finland to comply with international agreements on nuclear non-proliferation - mainly the Non-Proliferation Treaty (NPT). This regulatory control is exercised by the Nuclear Materials Section of the Finnish Radiation and Nuclear Safety Authority (STUK). The results of STUK's nuclear safeguards inspection activities in 2011 continued to demonstrate that the Finnish licence holders take good care of their nuclear materials. There were no indications of undeclared nuclear materials or activities and the inspected materials and activities were in accordance with the licence holders' declarations.

  9. Nuclear power plants 1995 - a world survey

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    The atw Statistics Report compiled by atw lists 428 nuclear power plants with 363 397 gross MWe in operation in 30 countries in late 1995. Another 62 units with 55 180 gross MWe were under construction in 18 countries. This adds up to a total of 490 units with an aggregate 418 577 MWe. In the course of 1995 four units in four countries started commercial operation. In the survey of electricity generation in 1995 for which no information was made available from China and Kasachstan, a total of 417 nuclear power plants were covered. In the year under review they generated an aggregate 2 282 614 GWH, which is 3.4% more than in the previous year. The highest nuclear generation again was recorded in the USA with 705 771 GWh, followed by France with 377 021 GWh. The Grohnde power station in Germany attained the maximum annual production figure of 11 359 GWh. The survey includes nine tables indicating the generating performance of each nuclear power plant, the development of electricity generation in nuclear plants, and status of nuclear power plants at the end of 1995 arranged by countries, types of reactors, and reactor manufacturers. (orig.) [de

  10. Low-temperature nuclear heat applications: Nuclear power plants for district heating

    International Nuclear Information System (INIS)

    1987-08-01

    The IAEA reflected the needs of its Member States for the exchange of information in the field of nuclear heat application already in the late 1970s. In the early 1980s, some Member States showed their interest in the use of heat from electricity producing nuclear power plants and in the development of nuclear heating plants. Accordingly, a technical committee meeting with a workshop was organized in 1983 to review the status of nuclear heat application which confirmed both the progress made in this field and the renewed interest of Member States in an active exchange of information about this subject. In 1985 an Advisory Group summarized the Potential of Low-Temperature Nuclear Heat Application; the relevant Technical Document reviewing the situation in the IAEA's Member States was issued in 1986 (IAEA-TECDOC-397). Programme plans were made for 1986-88 and the IAEA was asked to promote the exchange of information, with specific emphasis on the design criteria, operating experience, safety requirements and specifications for heat-only reactors, co-generation plants and power plants adapted for heat application. Because of a growing interest of the IAEA's Member States about nuclear heat employment in the district heating domaine, an Advisory Group meeting was organized by the IAEA on ''Low-Temperature Nuclear Heat Application: Nuclear Power Plants for District Heating'' in Prague, Czechoslovakia in June 1986. The information gained up to 1986 and discussed during this meeting is embodied in the present Technical Document. 22 figs, 11 tabs

  11. Quality assurance in nuclear power plant

    International Nuclear Information System (INIS)

    Magalhaes, M.T. de

    1981-01-01

    The factors related to the licensing procedures of a nuclear power plant (quality assurance and safety analysis) are presented and discussed. The consequences of inadequate attitudes towards these factors are shown and suggestions to assure the safety of nuclear power plants in Brazil are presented. (E.G.) [pt

  12. 78 FR 55118 - Seismic Instrumentation for Nuclear Power Plants

    Science.gov (United States)

    2013-09-09

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0202] Seismic Instrumentation for Nuclear Power Plants... Reports for Nuclear Power Plants: LWR Edition,'' Section 3.7.4, ``Seismic Instrumentation.'' DATES: Submit... Nuclear Power Plants: LWR Edition'' (SRP, from the current Revision 2 to a new Revision 3). The proposed...

  13. Nuclear power plant operation 2016. Pt. 1

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2017-05-15

    A report is given on the operating results achieved in 2016, events important to plant safety, special and relevant repair, and retrofit measures from nuclear power plants in Germany. Reports about nuclear power plants in Belgium, Finland, the Netherlands, Switzerland, and Spain will be published in a further issue.

  14. Role and position of Nuclear Power Plants Research Institute in nuclear power industry

    International Nuclear Information System (INIS)

    Metke, E.

    1984-01-01

    The Nuclear Power Plants Research Institute carries out applied and experimental research of the operating states of nuclear power plants, of new methods of surveillance and diagnosis of technical equipment, it prepares training of personnel, carries out tests, engineering and technical consultancy and the research of automated control systems. The main research programme of the Institute is the rationalization of raising the safety and operating reliability of WWER nuclear power plants. The Institute is also concerned with quality assurance of selected equipment of nuclear power plants and assembly works, with radioactive waste disposal and the decommissioning of nuclear power plants as well as with the preparation and implementation of the nuclear power plant start-up. The Research Institute is developing various types of equipment, such as equipment for the decontamination of the primary part of the steam generator, a continuous analyzer of chloride levels in water, a gas monitoring instrument, etc. The prospects are listed of the Research Institute and its cooperation with other CMEA member countries. (M.D.)

  15. Modifications at operating nuclear power plants

    International Nuclear Information System (INIS)

    Duffy, T.J.; Gazda, P.A.

    1985-01-01

    Modifications at operating nuclear power plants offer the structural engineer many challenges in the areas of scheduling of work, field adjustments, and engineering staff planning. The scheduling of structural modification work for operating nuclear power plants is normally closely tied to planned or unplanned outages of the plant. Coordination between the structural engineering effort, the operating plant staff, and the contractor who will be performing the modifications is essential to ensure that all work can be completed within the allotted time. Due to the inaccessibility of some areas in operating nuclear power plants or the short time available to perform the structural engineering in the case of an unscheduled outrage, field verification of a design is not always possible prior to initiating the construction of the modification. This requires the structural engineer to work closely with the contractor to promptly resolve problems due to unanticipated interferences or material procurement problems that may arise during the course of construction. The engineering staff planning for structural modifications at an operating nuclear power plant must be flexible enough to permit rapid response to the common ''fire drills,'' but controlled enough to ensure technically correct designs and to minimize the expenditure of man-hours and the resulting engineering cost

  16. Quality management of nuclear fuel

    International Nuclear Information System (INIS)

    2006-01-01

    The Guide presents the quality management requirements to be complied with in the procurement, design, manufacture, transport, receipt, storage, handling and operation of nuclear fuel. The Guide also applies to control rods and shield elements to be placed in the reactor. The Guide is mainly aimed for the licensee responsible for the procurement and operation of fuel, for the fuel designer and manufacturer and for other organisations, whose activities affect fuel quality and the safety of fuel transport, storage and operation. General requirements for nuclear fuel are presented in Section 114 of the Finnish Nuclear Energy Decree and in Section 15 of the Government Decision (395/1991). Regulatory control of the safety of fuel is described in Guides YVL6.1, YVL6.2 and YVL6.3. An overview of the regulatory control of nuclear power plants carried out by STUK (Radiation and Nuclear Safety Authority, Finland) is clarified in Guide YVL1.1

  17. Finnish in America: Two Kinds of Finglish.

    Science.gov (United States)

    Karttunen, Frances; Moore, Kate

    The Finnish language spoken by Finns who emigrated to America is often called "Finglish;" two distinct varieties are discussed in this paper. American Finnish differs from native Finnish in its assimilation of a substantial number of loan words that augment and sometimes replace the original vocabulary. Many loan words deal with employment,…

  18. Nuclear power plant's safety and risk

    International Nuclear Information System (INIS)

    Franzen, L.F.

    1975-01-01

    Starting with a comprehensive safety strategy as evolved over the past years and the present legal provisions for the construction and operation of nuclear power plants, the risk of the intended operation, of accidents and unforeseen events is discussed. Owing to the excellent safety record of nuclear power plants, main emphasis in discussing accidents is given to the precautionary analysis within the framework of the licensing procedure. In this context, hypothetical accidents are mentioned only as having been utilized for general risk comparisons. The development of a comprehensive risk concept for a completely objective safety assessment of nuclear power plants remains as a final goal. (orig.) [de

  19. Heat supply from nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Stach, V [Ustav Jaderneho Vyzkumu CSKAE, Rez (Czechoslovakia)

    1978-05-01

    The current state of world power production and consumption is assessed. Prognoses made for the years 1980 to 2000 show that nuclear energy should replace the major part of fossil fuels not only in the production of power but also in the production of heat. In this respect high-temperature reactors are highly prospective. The question is discussed of the technical and economic parameters of dual-purpose heat and power plants. It is, however, necessary to solve problems arising from the safe siting of nuclear heat and power plants and their environmental impacts. The economic benefits of combined power and heat production by such nuclear plants is evident.

  20. Finnish early warning system for nuclear emergencies: Experiences during 2000-2001

    Energy Technology Data Exchange (ETDEWEB)

    Vesterbacka, K.; Lahtinen, J.; Ilander, T. [Radiation and Nuclear Safety Authority, Research and Environmental Surveillance, Helsinki (Finland)

    2003-06-01

    The Finnish early warning system for nuclear emergencies consists of the nation-wide automatic external dose-rate monitoring network and the control system, which is known as USVA. The monitoring network comprises of approx. 300 AAM95 central stations and substations equipped with RD-02 or RD-02L GM tubes. Stations are thoroughly inspected on a routine basis every 4-5 years. During the inspection the GM tube, battery and power adapters of the station are replaced with new ones, as is also the modem if necessary, and the alarm connections to USVA are tested. The USVA system utilizes advanced www technology (including a browser-based, easy-to-use user interface) and a network of PCs with dedicated tasks. USVA's central hardware is located at STUK. USVA began its operation in the beginning of the year 2000, replacing the older y2k incompatible system. In a routine situation, USVA collects the monitoring data once a day. The USVA is capable of connecting (via telephone lines) to eight AAM stations concurrently, and the results from the whole country are obtained in about 15 minutes. When the system receives an alarm message from the network, it sends a text message to the mobile phones defined in a separate list and starts an automatic data collection procedure at all the stations situated within a certain distance (100 km) from the alarm-causing station. (orig.)

  1. Information Technology for Nuclear Power Plant Configuration Management

    International Nuclear Information System (INIS)

    2010-07-01

    Configuration management (CM) is an essential component of nuclear power plant design, construction and operation. The application of information technology (IT) offers a method to automate and ensure the timely and effective capture, processing and distribution of key nuclear power plant information to support CM principles and practical processes and procedures for implementation of CM at nuclear power plants. This publication reviews some of the principles established in IAEA-TECDOC-1335, 'Configuration Management in Nuclear Power Plants.' It also recaps tenets laid out in IAEA- TECDOC-1284, 'Information Technology Impact on Nuclear Power Plant Documentation' that supports CM programmes. This publication has been developed in conjunction with and designed to support these other two publications. These three publications combined provide a comprehensive discussion on configuration management, information technology and the relationship between them. An extensive discussion is also provided in this publication on the role of the design basis of the facility and its control through the CM process throughout the facility's lifetime. While this report was developed specifically for nuclear power plants, the principles discussed can be usefully applied to any high hazard nuclear facility

  2. Nuclear power: Europa report

    International Nuclear Information System (INIS)

    Anon.

    2004-01-01

    Last year, 2003, nuclear power plants were available for energy supply, respectively, in 18 countries all over Europe. In 8 of the 15 member countries of the European Union (EU-15) nuclear power plants have been operation. In 7 of the 13 EU Candidate Countries (incl. Turkey) nuclear energy was used for power production. A total of 208 plants with an aggregate net capacity of 171 031 MWe and an aggregate gross capacity of 180 263 MWe were in operation at the end of 2003. No unit reached first criticality in 2003 or was connected to the grid. The unit Calder Hall 1 to Calder Hall 4 have been permanently shut down in Great Britain due to economical reasons and an earlier decision. In Germany the NPP Stade was closed. The utility E.ON has decided to shut down the plant due to the efforts of the liberalisation of the electricity markets. Last year, 8 plants were under construction in Romania (1), Russia (3), Slovakia (2 - suspended), and the Ukraine (2), that is only in East European Countries. The Finnish parliament approved plans for the construction of the country's fifth nuclear power reactor by a majority of 107 votes to 92. The consortium led by Framatome ANP was awarded the contract to build the new nuclear power plant (EPR, 1 600 MW) in Olkiluoto. In eight countries of the European Union 136 nuclear power plants have been operated with an aggregate gross capacity of 127 708 MWe and an aggregate net capacity of 121 709 MWe. Net electricity production in 2003 in the EU amounts to approx. 905 TWh gross, which means a share of about 33 per cent of the total production in the whole EU. Shares of nuclear power differ widely among the operator countries. They reach 80% in Lithuania, 78% in France, 57% in the Slovak Republic, 57% in Belgium, and 46% in the Ukraine. Nuclear power also provides a noticeable share in the electricity supply of countries, which operate no own nuclear power plants, e.g. Italy, Portugal, and Austria. (orig.)

  3. The Finnish customs to introduce more efficient radiation control

    International Nuclear Information System (INIS)

    Sevon, H.

    1995-01-01

    The customs authorities have started to control the import of radioactive substances and nuclear materials. Regular radiation measurements will be introduced at various frontier crossing points. Cooperation with the Finnish Centre for Radiation and Nuclear Safety has also been intensified. The control measures apply primarily to goods traffic coming from - or through - Russia and the Baltic countries. The first stationary radiation measuring equipment for vehicles and their loads is in use at Vaalimaa customs station. All the busiest customs stations on Finland's eastern frontier will be provided with stationary radiation meters. The measurements will focus on scrap metal loads and loads that come either from the environs of certain nuclear facilities in the area of former Soviet Union or from areas that are particularly polluted. (orig.) (2 figs.)

  4. Seismic safety of nuclear power plants

    International Nuclear Information System (INIS)

    Guerpinar, A.; Godoy, A.

    2001-01-01

    This paper summarizes the work performed by the International Atomic Energy Agency in the areas of safety reviews and applied research in support of programmes for the assessment and enhancement of seismic safety in Eastern Europe and in particular WWER type nuclear power plants during the past seven years. Three major topics are discussed; engineering safety review services in relation to external events, technical guidelines for the assessment and upgrading of WWER type nuclear power plants, and the Coordinated Research Programme on 'Benchmark study for the seismic analysis and testing of WWER type nuclear power plants'. These topics are summarized in a way to provide an overview of the past and present safety situation in selected WWER type plants which are all located in Eastern European countries. Main conclusion of the paper is that although there is now a thorough understanding of the seismic safety issues in these operating nuclear power plants, the implementation of seismic upgrades to structures, systems and components are lagging behind, particularly for those cases in which the re-evaluation indicated the necessity to strengthen the safety related structures or install new safety systems. (author)

  5. Concrete structures for nuclear facilities

    International Nuclear Information System (INIS)

    1996-01-01

    The detailed requirements for the design and fabrication of the concrete structures for nuclear facilities and for the documents to be submitted to the Finnish Centre for Radiation and Nuclear Safety (STUK) are given in the guide. It also sets the requirements for the inspection of concrete structures during the construction and operation of facilities. The requirements of the guide primarily apply to new construction. As regards the repair and modification of nuclear facilities built before its publication, the guide is followed to the extent appropriate. The regulatory activities of the Finnish Centre for Radiation and Nuclear Safety during a nuclear facility's licence application review and during the construction and operation of the facility are summarised in the guide YVL 1.1

  6. Nuclear power plant

    International Nuclear Information System (INIS)

    Aisaka, Tatsuyoshi; Kamahara, Hisato; Yanagisawa, Ko.

    1982-01-01

    Purpose: To prevent corrosion stress cracks in structural materials in a BWR type nuclear power plant by decreasing the oxygen concentration in the reactor coolants. Constitution: A hydrogen injector is connected between the condensator and a condensate clean up system of a nuclear power plant. The injector is incorporated with hydrogenated compounds formed from metal hydrides, for example, of alloys such as lanthanum-nickel alloy, iron titanium alloy, vanadium, palladium, magnesium-copper alloy, magnesium-nickel alloy and the like. Even if the pressure of hydrogen obtained from a hydrogen bomb or by way of water electrolysis is changed, the hydrogen can always be injected into a reactor coolant at a pressure equal to the equilibrium dissociation pressure for metal hydride by introducing the hydrogen into the hydrogen injector. (Seki, T.)

  7. Basic safety principles for nuclear power plant

    International Nuclear Information System (INIS)

    Zhang Shiguan

    1989-01-01

    To ensure the safety operation of nuclear power plant, one should strictly adhere to the implelmentation of safety codes and the establishment of nuclear safety code system, as well as the applicable basic safety principles of nuclear power plants. This article briefly introduce the importance of nuclear codes and its economic benefits and the implementation of basic safety principles to be accumulated in practice for many years by various countries

  8. Fire prevention in nuclear power plants

    International Nuclear Information System (INIS)

    1993-01-01

    The causes and frequency of fires at nuclear power plants in various countries are briefly given. Methods are described of fire hazard assessment at nuclear power plants, such as Gretener's method and the probabilistic methods. Approaches to the management of nuclear reactor fire protection in various countries as well as the provisions to secure such protection are dealt with. An overview and the basic characteristics of fire detection and extinguishing systems is presented. (Z.S.). 1 tab

  9. Radioactive waste management for German nuclear power plants

    International Nuclear Information System (INIS)

    Weh, R.; Methling, D.; Sappok, M.

    1996-01-01

    In Germany, back-end fuel cycle provisions must be made for the twenty nuclear power plants currently run by utilities with an aggregate installed power of 23.4 GWe, and the four nuclear power plants already shut down. In addition, there are the shut down nuclear power plants of the former German Democratic Republic, and a variety of decommissioned prototype nuclear power plants built with the participation of the federal government and by firms other than utilities. The nuclear power plants operated by utilities contribute roughly one third of the total electricity generation in public power plants, thus greatly ensuring a stable energy supply in Germany. The public debate in Germany, however, focuses less on the good economic performance of these plants, and the positive acceptance at their respective sites, but rather on their spent fuel and waste management which, allegedly, is not safe enough. The spent fuel and waste management of German nuclear power plants is planned on a long-term basis, and executed in a responsible way by proven technical means, in the light of the provisions of the Atomic Act. Each of the necessary steps of the back end of the fuel cycle is planned and licensed in accordance with German nuclear law provisions. The respective facilities are built, commissioned, and monitored in operation with the dedicated assistance of expert consultants and licensing authorities. Stable boundary conditions are a prerequisite in ensuring the necessary stability in planning and running waste management schemes. As producers of waste, nuclear power plants are responsible for safe waste management and remain the owners of that waste until it has been accepted by a federal repository. (orig./DG) [de

  10. Limiting conditions for nuclear power plant competitiveness vs. fossil and wind plants

    International Nuclear Information System (INIS)

    Feretic, Danilo; Cavlina, Nikola

    2010-01-01

    The aim of this paper is to compare potential energy options for future electricity generation. The paper considers comparison of discounted total cost of electricity generated by nuclear power plant and by combined natural gas and wind plants, having in total equal electricity generation. Large uncertainty in the future fuel costs makes planning of optimal power generating mix very difficult to justify. Probabilistic method is used in the analysis which allows inclusion of uncertainties in future electricity generating cost prediction. Additionally, an informative functional relation between nuclear plant investment cost, natural gas price and wind plant efficiency, that determines competitive power generation between considered options, is also shown. Limiting conditions for nuclear power plant competitiveness vs. fossil and wind plants are presented. (authors)

  11. Docommissioning of nuclear power plants

    International Nuclear Information System (INIS)

    Essmann, J.

    1981-01-01

    The German utilities operating nuclear power plants have long concerned themselves with aspects of decommissioning and for this purpose an engineering company was given a contract to study the entire spectrum of decommissioning. The results of this study have been available in autumn 1980 and it is possible to discuss all the aspects of decommissioning on a new basis. Following these results no change in the design concept of LWR nuclear power plants in operation or under construction is necessary because the techniques, necessary for decommissioning, are fully available today. The technical feasibility of decommissioning for power plants of Biblis A and KRB type has been shown in detail. The calculations of the quantity of waste produced during removal of a nuclear power plant could be confirmed and it could be determined with high procedure. The radiation dose to the decommissioning personnel is in the range of the radiation protection regulations and is in the same range as the radiation dose to the personnel within a yearly inservice inspection. (AF)

  12. Fire prevention in nuclear plants

    International Nuclear Information System (INIS)

    Cayla, J.P.; Jacquet-Francillon, J.; Matarozzo, F.

    2014-01-01

    About 80 fire starts are reported in EDF nuclear power plants every year but only 3 or 4 turn into a real fire and none has, so far, has led to a major safety failure of a nuclear plant. A new regulation has been implemented in july 2014 that strengthens the concept of defense in depth, proposes an approach that is proportionate to the stakes and risks, this proportionality means that the requirements for a power reactor are not the same as for a nuclear laboratory, and imposes an obligation or result rather than of means. The second article deals with the fire that broke out in the waste silo number 130 at La Hague plant in january 1981. The investigation showed that the flammability of the silo content had been underestimated. The third article presents the consequences of the fire that broke out in a power transformer at the Cattenom plant in june 2013. The fire was rapidly brought under control thanks to the immediate triggering of the emergency plan. The article details also the feedback experience of this event. (A.C.)

  13. Seismic review of existing nuclear power plants

    International Nuclear Information System (INIS)

    Yanev, P.I.; Mayes, R.L.; Jones, L.R.

    1975-01-01

    Because of developments in the fields of earthquake and structural engineering over the last two decades, the codes, standards and design criteria for Nuclear Power Plants and other critical structures have changed substantially. As a result, plants designed only a few years ago do not satisfy the requirements for new plants. Accordingly, the Regulatory Agencies are requiring owners of older Nuclear Power Plants to re-qualify the plants seismically, using codes, standards, analytical techniques and knowledge developed in recent years. Seismic review consists of three major phases: establishing the design and performance criteria, re-qualifying the structures, and re-qualifying the equipment. The authors of the paper have been recently involved in the seismic review of existing nuclear power plants in the United States. This paper is a brief summary of their experiences

  14. Atom Mirny: The World’S First Civilian Nuclear Power Plant

    International Nuclear Information System (INIS)

    Kaiser, Peter; Madsen, Michael

    2013-01-01

    The world’s first civilian nuclear power plant was commissioned on June 27, 1954 in Obninsk, which was at that time in the Soviet Union, today, the Russian Federation. The Obninsk nuclear power plant generated electricity and supported experimental nuclear research. The Obninsk nuclear power plant operated without incident for 48 years. In September 2002, the last fuel subassembly was unloaded, when the Obninsk nuclear power plant set another first: it became the first nuclear power plant to be decommissioned in Russia

  15. Nuclear and thermal power plants and the environment

    International Nuclear Information System (INIS)

    Mejstrik, V.

    1978-01-01

    The growth is briefly outlined of world daily power consumption and the possibilities are discussed of meeting this demand. Coal and nuclear power are of primary importance as energy resources for the present and the near future. Production costs per 1 kWh of electric power in nuclear power plants are already lower in fossil fuel power plants and both types of power plants have an environmental impact. Activities are presented of radioisotopes resulting from nuclear reactor operation and their release and environmental impact are discussed. An analysis is made of emissions from combustion processes and of wastes from fossil-fuel power plant operation. The environmental impacts of nuclear and fossil fuel power plants are compared. (Z.M.)

  16. Nuclear and thermal power plants and the environment

    Energy Technology Data Exchange (ETDEWEB)

    Mejstrik, V [Ceskoslovenska Akademie Ved, Pruhonice. Ustav Krajinne Ekologie

    1978-01-01

    The growth is briefly outlined of world daily power consumption and the possibilities are discussed of meeting this demand. Coal and nuclear power are of primary importance as energy resources for the present and the near future. Production costs per 1 kWh of electric power in nuclear power plants are already lower than in fossil fuel power plants and both types of power plants have an environmental impact. Activities are presented of radioisotopes resulting from nuclear reactor operation and their release and environmental impact are discussed. An analysis is made of emissions from combustion processes and of wastes from fossil-fuel power plant operation. The environmental impacts of nuclear and fossil fuel power plants are compared.

  17. Intercomparison of Finnish and Russian whole-body counters used for the determination of 137Cs body burden in reindeer-herding populations

    International Nuclear Information System (INIS)

    Rahola, T.; Tillander, M.

    1995-01-01

    Intercalibration is a very important quality control in whole-body counting, as the human body is a very difficult ''sample'' to calibrate for. In 1994 the Finnish Centre for Radiation and Nuclear Safety (STUK), the Laboratory of Radiochemistry of the University of Helsinki and the Institute of Radiation Hygiene (IRH) of St. Petersburg agreed to undertake the first Finnish-Russian intercalibration project for whole-body counters. The monitoring of body burdens of indigenous inhabitants in the far north of Russia, from the Kola Peninsula to Chuhodka, has been the responsibility of the ISH since 1960; the above-.mentioned Finnish institutes have monitored reindeer breeders in Finnish Lapland since 1961. The intercalibration was done in the field by measuring the same persons with both systems in Finnish Lapland and in the Kola Peninsula. Mean body burdens in the reindeer-herding population in the areas of current interest are presented in the present paper. 7 refs., 3 figs., 1 tab

  18. Strengthening of nuclear power plant construction safety management

    International Nuclear Information System (INIS)

    Yu Jun

    2012-01-01

    The article describes the warning of the Fukushima nuclear accident, and analyzes the major nuclear safety issues in nuclear power development in China, problems in nuclear power plants under construction, and how to strengthen supervision and management in nuclear power construction. It also points out that the development of nuclear power must attach great importance to the safety, and nuclear power plant construction should strictly implement the principle of 'safety first and quality first'. (author)

  19. Slovenske elektrarne, a.s., Mochovce Nuclear Power Plant

    International Nuclear Information System (INIS)

    1998-01-01

    In this booklet the uranium atom nucleus fission as well as electricity generation in a nuclear power plant (primary circuit, reactor, reactor pressure vessel, fuel assembly, control rod and reactor power control) are explained. Scheme of electricity generation in nuclear power plant and Cross-section of Mochovce Nuclear Power Plant unit are included. In next part a reactor scram, refuelling of fuel, instrumentation and control system as well as principles of nuclear safety and safety improvements are are described

  20. Aircraft, ships, spacecraft, nuclear plants and quality

    International Nuclear Information System (INIS)

    Patrick, M.G.

    1984-05-01

    A few quality assurance programs outside the purview of the Nuclear Regulatory Commission were studied to identify features or practices which the NRC could use to enhance its program for assuring quality in the design and construction of nuclear power plants. The programs selected were: the manufacture of large commercial transport aircraft, regulated by the Federal Aviation Administration; US Navy shipbuilding; commercial shipbuilding regulated by the Maritime Administration and the US Coast Guard; Government-owned nuclear plants under the Department of Energy; spacecraft under the National Aeronautics and Space Administration; and the construction of nuclear power plants in Canada, West Germany, France, Japan, Sweden, and the United Kingdom

  1. Thermal coupling system analysis of a nuclear desalination plant

    International Nuclear Information System (INIS)

    Adak, A.K.; Srivastava, V.K.; Tewari, P.K.

    2010-01-01

    When a nuclear reactor is used to supply steam for desalination plant, the method of coupling has a significant technical and economic impact. The exact method of coupling depends upon the type of reactor and type of desalination plant. As a part of Nuclear Desalination Demonstration Project (NDDP), BARC has successfully commissioned a 4500 m 3 /day MSF desalination plant coupled to Madras Atomic Power Station (MAPS) at Kalpakkam. Desalination plant coupled to nuclear power plant of Pressurized Heavy Water Reactor (PHWR) type is a good example of dual-purpose nuclear desalination plant. This paper presents the thermal coupling system analysis of this plant along with technical and safety aspects. (author)

  2. Insurance risk of nuclear power plant concentrations

    International Nuclear Information System (INIS)

    Feldmann, J.

    1976-01-01

    The limited number of sites available in the Federal Republic of Germany for the erection of nuclear power plants has resulted in the construction of multiple nuclear generating units on a few sites, such as Biblis, Gundremmingen and Neckarwestheim. At a value invested of approximately DM 1,200/kW this corresponds to a property concentration on one site worth DM 2 - 3 billion and more. This raises the question whether a concentration of value of this magnitude does not already exceed the limits of bearable economic risks. The property risk of a nuclear power plant, as that of any other industrial plant, is a function of the property that can be destroyed in a maximum probable loss. Insurance companies subdivide plants into so-called complex areas in which fire damage or nuclear damage could spread. While in some foreign countries twin nuclear power plants are built, where the technical systems of both units are installed in one building without any physical separation, dual unit plants are built in the Federal Republic in which the complexes with a high concentration of valuable property are physically separate building units. As a result of this separation, property insurance companies have no grounds for assessing the risk and hence, the premium different from those of single unit plants. (orig.) [de

  3. Application of Advanced Technology to Improve Plant Performance in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Hashemian, H.M.

    2011-01-01

    Advances in computer technologies, signal processing, analytical modeling, and the advent of wireless sensors have provided the nuclear industry with ample means to automate and optimize maintenance activities and improve safety, efficiency, and availability, while reducing costs and radiation exposure to maintenance personnel. This paper provides a review of these developments and presents examples of their use in the nuclear power industry and the financial and safety benefits that they have produced. As the current generation of nuclear power plants have passed their mid-life, increased monitoring of their health is critical to their safe operation. This is especially true now that license renewal of nuclear power plants has accelerated, allowing some plants to operate up to 60 years or more. Furthermore, many utilities are maximizing their power output through uprating projects and retrofits. This puts additional demand and more stress on the plant equipment such as the instrumentation and control (I and C) systems and the reactor internal components making them more vulnerable to the effects of aging, degradation, and failure. In the meantime, the nuclear power industry is working to reduce generation costs by adopting condition-based maintenance strategies and automation of testing activities. These developments have stimulated great interest in on-line monitoring (OLM) technologies and new diagnostic and prognostic methods to anticipate, identify, and resolve equipment and process problems and ensure plant safety, efficiency, and immunity to accidents. The foundation for much of the required technologies has already been established through 40 years of research and development (R and D) efforts performed by numerous organizations, scientists, and engineers around the world including the author. This paper provides examples of these technologies and demonstrates how the gap between some of the more important R and D efforts and end users have been filled

  4. Closures for underground nuclear power plants

    International Nuclear Information System (INIS)

    1981-10-01

    This study demonstrates that, with the appropriate selection of an access concept on the underground nuclear power plant, it is possible to design a gate complying with the increased requirements of the construction of an underground nuclear power plant. The investigations revealed that a comparison leakage of 42 mm in diameter for the failure of seals is too conservative. When selecting suitable seals a leakage being more extensive than the above mentioned one can be prevented even in case of disturbance lasting several months. The closure structures of the personnel and material accesses do not represent any weak point within the concept of the construction method for underground nuclear power plants. (orig./HP)

  5. Methods of assessing nuclear power plant risks

    International Nuclear Information System (INIS)

    Skvarka, P.; Kovacz, Z.

    1985-01-01

    The concept of safety evalution is based on safety criteria -standards or set qualitative values of parameters and indices used in designing nuclear power plants, incorporating demands on the quality of equipment and operation of the plant, its siting and technical means for achieving nuclear safety. The concepts are presented of basic and optimal risk values. Factors are summed up indispensable for the evaluation of the nuclear power plant risk and the present world trend of evaluation based on probability is discussed. (J.C.)

  6. YKAe Research programme on nuclear power plant systems behaviour and operational aspects of safety 1990-1994, Final report

    International Nuclear Information System (INIS)

    Mattila, L.; Vanttola, T.

    1995-04-01

    The research programme on Nuclear Power Plant Systems Behaviour and Operational Aspects of Safety was carried out between 1990 and 1994. In the field of Safe operational margins of nuclear fuel and reactor core, an up-to-date steady-state fuel performance model was validated for higher burn-ups and well-characterized VVER fuel experiments were carried out. A comprehensive reactor analysis code system was extended and validated for complex 3-D phenomena, such as ATWS and boron dilution transients. Advanced hydraulics methods were added to the dynamics codes. Experiments were carried out with PACTEL, the most comprehensive thermal-hydraulic test facility for VVER-440-type reactors worldwide. For example, a series of natural circulation tests were provided for the first VVER-related international standard problem of the OECD/NEA. Advanced foreign computer codes for severe accidents were evaluated and modified for the needs of Finnish power plants. Specific progress was made in modelling the reflooding of an overheated core and in the structural analysis of a pressure vessel under corium load, as well as in experimental and theoretical studies of aerosol and hydrogen behaviour. Fire modelling was improved by implementing advanced calculation methods and by validating them against our own experiments and international test data. Techniques in living probabilistic safety assessment and risk decision-making were refined in pilot applications for continuous monitoring, follow-up and management of risks of an operating power plant. In the area of human reliability and organizational performance, factors important for the continuous development of the competence of control room operator teams and plant maintenance staff were identified. (237 refs., 75 figs., 13 tabs.)

  7. Striving for excellence in nuclear plant safety and reliability

    International Nuclear Information System (INIS)

    Beard, P.M.

    1985-01-01

    The Institute of Nuclear Power Operations, or INPO, promotes excellence in the construction and operation of nuclear power plants. All US nuclear utilities are INPO members. Additionally, INPO has an active international programme that includes utility participants from 13 countries and a supplier programme composed of 13 firms that provide construction, design or manufacturing services for nuclear utilities. INPO's activities revolve around four programme categories: (1) evaluating US nuclear plant construction projects and operating nuclear power plants; (2) assisting utilities in developing and maintaining performance-based training programmes and accrediting US nuclear plant training programmes; (3) analysing and sharing information on operating experience from plants around the world; (4) providing technical assistance to members and participants. INPO periodically evaluates all US operating nuclear power plants. Additionally, INPO uses the evaluations to observe good practices that can be shared with nuclear utilities world wide. The Significant Event Evaluation and Information Network (SEE-IN) programme provides a system for collecting, analysing and sharing information on plant operating experience throughout the world. SEE-IN provides the industry with information on events that could lead to serious consequences and provides recommendations on how these events can be prevented or their effects mitigated. INPO's international programme promotes information exchange among members and participants. The international programme centres on three activities: (1) collecting, analysing and sharing information on international nuclear plant operating experience; (2) establishing a forum for nuclear utilities world-wide to exchange technical data with each other; (3) providing technical assistance to participants on a variety of concerns

  8. Nuclear Power Plant Module, NPP-1: Nuclear Power Cost Analysis.

    Science.gov (United States)

    Whitelaw, Robert L.

    The purpose of the Nuclear Power Plant Modules, NPP-1, is to determine the total cost of electricity from a nuclear power plant in terms of all the components contributing to cost. The plan of analysis is in five parts: (1) general formulation of the cost equation; (2) capital cost and fixed charges thereon; (3) operational cost for labor,…

  9. Nuclear power plants and the environment

    Energy Technology Data Exchange (ETDEWEB)

    Barabas, K [Ceskoslovenska Komise pro Atomovou Energii, Prague

    1978-05-01

    The environmental impacts are compared of conventional coal-fired and oil-fired power plants and of nuclear power plants. The values are compared of SO/sub 2/, NO/sub 2/, ash and soot emissions with /sup 133/Xe and /sup 85/Kr fission products release and the requirement for air for diluting these emissions in the atmosphere is assessed. Also compared are thermal pollution from an oil-fired power plant and from PWR and fast reactor power plants. The conclusion is arrived at that nuclear energy can solve the problem of increasing demand for electric and heat power while reducing negative environmental impacts.

  10. Nuclear power plants and the environment

    International Nuclear Information System (INIS)

    Barabas, K.

    1978-01-01

    The environmental impacts are compared of conventional coal-fired and oil-fired power plants and of nuclear power plants. The values are compared of SO 2 , NO 2 , ash and soot emmisions with 133 Xe and 85 Kr fission products release and the requirement for air for diluting these emissions in the atmosphere is assessed. Also compared are thermal pollution from an oil-fired power plant and from PWR and fast reactor power plants. The conclusion is arrived at that nuclear energy can solve the problem of increasing demand for electric and heat power while reducing negative environmental impacts. (O.K.)

  11. Regulatory requirements for desalination plant coupled with nuclear reactor plant

    International Nuclear Information System (INIS)

    Yune, Young Gill; Kim, Woong Sik; Jo, Jong Chull; Kim, Hho Jung; Song, Jae Myung

    2005-01-01

    A small-to-medium sized reactor has been developed for multi-purposes such as seawater desalination, ship propulsion, and district heating since early 1990s in Korea. Now, the construction of its scaled-down research reactor, equipped with a seawater desalination plant, is planned to demonstrate the safety and performance of the design of the multi-purpose reactor. And the licensing application of the research reactor is expected in the near future. Therefore, a development of regulatory requirements/guides for a desalination plant coupled with a nuclear reactor plant is necessary for the preparation of the forthcoming licensing review of the research reactor. In this paper, the following contents are presented: the design of the desalination plant, domestic and foreign regulatory requirements relevant to desalination plants, and a draft of regulatory requirements/guides for a desalination plant coupled with a nuclear reactor plant

  12. Interaction of electromagnetic pulse with commercial nuclear-power-plant systems

    Energy Technology Data Exchange (ETDEWEB)

    Ericson, D.M. Jr.; Strawe, D.F.; Sandberg, S.J.; Jones, V.K.; Rensner, G.D.; Shoup, R.W.; Hanson, R.J.; Williams, C.B.

    1983-02-01

    This study examines the interaction of the electromagnetic pulse from a high altitude nuclear burst with commercial nuclear power plant systems. The potential vulnerability of systems required for safe shutdown of a specific nuclear power plant are explored. EMP signal coupling, induced plant response and component damage thresholds are established using techniques developed over several decades under Defense Nuclear Agency sponsorship. A limited test program was conducted to verify the coupling analysis technique as applied to a nuclear power plant. The results are extended, insofar as possible, to other nuclear plants.

  13. Interaction of electromagnetic pulse with commercial nuclear-power-plant systems

    International Nuclear Information System (INIS)

    Ericson, D.M. Jr.; Strawe, D.F.; Sandberg, S.J.; Jones, V.K.; Rensner, G.D.; Shoup, R.W.; Hanson, R.J.; Williams, C.B.

    1983-02-01

    This study examines the interaction of the electromagnetic pulse from a high altitude nuclear burst with commercial nuclear power plant systems. The potential vulnerability of systems required for safe shutdown of a specific nuclear power plant are explored. EMP signal coupling, induced plant response and component damage thresholds are established using techniques developed over several decades under Defense Nuclear Agency sponsorship. A limited test program was conducted to verify the coupling analysis technique as applied to a nuclear power plant. The results are extended, insofar as possible, to other nuclear plants

  14. Speech perception and vocabulary growth: A longitudinal study of Finnish-Russian bilinguals and Finnish monolinguals from infancy to three years

    NARCIS (Netherlands)

    Silvén, M.; Voeten, M.J.M.; Kouvo, A.M.; Lundén, M.

    2014-01-01

    Growth modeling was applied to monolingual (N = 26) and bilingual (N = 28) word learning from 14 to 36 months. Level and growth rate of vocabulary were lower for Finnish-Russian bilinguals than for Finnish monolinguals. Processing of Finnish speech sounds at 7 but not at 11 months predicted level,

  15. Directory of nuclear power plants in the world, 1985

    International Nuclear Information System (INIS)

    Fujii, Haruo

    1985-01-01

    This book presents technical information and estimates trends of load factors and construction costs of nuclear power plants. Particularly road maps indicating plants are drawn in, which would be practical in visiting them. The data used here are directly confirmed by operators in every part of the world. Therefore, they reflect up-to-date nuclear power developments and its future. This allows wide and exact understanding of world's nuclear power. Chapter 1 presents nuclear power growth around the world and estimates forecasts based on information from electric power companies: nuclear power growths and the growths in the number of reactors around the world, in WOCA (World outside the Centrally Planned Economies Area), in CPEA (Centrally Planned Economies Area) are analyzed in detail. Chapter 2 presents nuclear power plants on maps by country. The maps show exact locations of nuclear power plants with local cities around them, rivers and lakes. For convenience, symbols are given to aid in identifying the types of reactors. Chapter 3 presents general information of nuclear power plants. Also the addresses of operators, all segments of nuclear power supply industries and nuclear organizations are included. For convenience, the index of nuclear power plants is added. Chapter 4 presents technical information, road maps in large scales and photographs of nuclear power plants in the world. The road maps show exact locations of plants. Chapter 5 presents operating experiences, load factors, refuelling and maintenance outages. The trends of data are analyzed both regionally (WOCA, CPEA) and world-widely. Chapter 6 presents trends of construction costs, component costs as percent of total construction costs and direct costs, and construction durations. (J.P.N.)

  16. Cooling water recipients for nuclear power plants

    International Nuclear Information System (INIS)

    Dahl, F.-E.; Saetre, H.J.

    1971-10-01

    The hydrographical and hydrological conditions at 17 prospective nuclear power plant sites in the Oslofjord district are evaluated with respect to their suitability as recipients for thermal discharges from nuclear power plants. No comparative evaluations are made. (JIW)

  17. Fuzzy logic control of nuclear power plant

    International Nuclear Information System (INIS)

    Yao Liangzhong; Guo Renjun; Ma Changwen

    1996-01-01

    The main advantage of the fuzzy logic control is that the method does not require a detailed mathematical model of the object to be controlled. In this paper, the shortcomings and limitations of the model-based method in nuclear power plant control were presented, the theory of the fuzzy logic control was briefly introduced, and the applications of the fuzzy logic control technology in nuclear power plant controls were surveyed. Finally, the problems to be solved by using the fuzzy logic control in nuclear power plants were discussed

  18. Decommissioning of nuclear power plants

    International Nuclear Information System (INIS)

    Vollradt, J.

    1977-01-01

    A survey of the main questions of decommissioning of nuclear power plants will be given in the sight of German utilities (VDEW-Working group 'Stillegung'). The main topics are: 1) Definitions of decommissioning, entombment, removal and combinations of such alternatives; 2) Radioactive inventory (build up and decay); 3) Experience up to now; 4) Possibilities to dismantle are given by possibility to repair nuclear power plants; 5) Estimated costs, waste, occupational radiation dose; 6) German concept of decommissioning. (orig./HK) [de

  19. Safety of nuclear power plants: Design. Safety requirements

    International Nuclear Information System (INIS)

    2000-01-01

    The present publication supersedes the Code on the Safety of Nuclear Power Plants: Design (Safety Series No. 50-C-D (Rev. 1), issued in 1988). It takes account of developments relating to the safety of nuclear power plants since the Code on Design was last revised. These developments include the issuing of the Safety Fundamentals publication, The Safety of Nuclear Installations, and the present revision of various safety standards and other publications relating to safety. Requirements for nuclear safety are intended to ensure adequate protection of site personnel, the public and the environment from the effects of ionizing radiation arising from nuclear power plants. It is recognized that technology and scientific knowledge advance, and nuclear safety and what is considered adequate protection are not static entities. Safety requirements change with these developments and this publication reflects the present consensus. This Safety Requirements publication takes account of the developments in safety requirements by, for example, including the consideration of severe accidents in the design process. Other topics that have been given more detailed attention include management of safety, design management, plant ageing and wearing out effects, computer based safety systems, external and internal hazards, human factors, feedback of operational experience, and safety assessment and verification. This publication establishes safety requirements that define the elements necessary to ensure nuclear safety. These requirements are applicable to safety functions and the associated structures, systems and components, as well as to procedures important to safety in nuclear power plants. It is expected that this publication will be used primarily for land based stationary nuclear power plants with water cooled reactors designed for electricity generation or for other heat production applications (such as district heating or desalination). It is recognized that in the case of

  20. Safety of nuclear power plants: Design. Safety requirements

    International Nuclear Information System (INIS)

    2004-01-01

    The present publication supersedes the Code on the Safety of Nuclear Power Plants: Design (Safety Series No. 50-C-D (Rev. 1), issued in 1988). It takes account of developments relating to the safety of nuclear power plants since the Code on Design was last revised. These developments include the issuing of the Safety Fundamentals publication, The Safety of Nuclear Installations, and the present revision of various safety standards and other publications relating to safety. Requirements for nuclear safety are intended to ensure adequate protection of site personnel, the public and the environment from the effects of ionizing radiation arising from nuclear power plants. It is recognized that technology and scientific knowledge advance, and nuclear safety and what is considered adequate protection are not static entities. Safety requirements change with these developments and this publication reflects the present consensus. This Safety Requirements publication takes account of the developments in safety requirements by, for example, including the consideration of severe accidents in the design process. Other topics that have been given more detailed attention include management of safety, design management, plant ageing and wearing out effects, computer based safety systems, external and internal hazards, human factors, feedback of operational experience, and safety assessment and verification. This publication establishes safety requirements that define the elements necessary to ensure nuclear safety. These requirements are applicable to safety functions and the associated structures, systems and components, as well as to procedures important to safety in nuclear power plants. It is expected that this publication will be used primarily for land based stationary nuclear power plants with water cooled reactors designed for electricity generation or for other heat production applications (such as district heating or desalination). It is recognized that in the case of

  1. Safety principles for nuclear power plants

    International Nuclear Information System (INIS)

    Vuorinen, A.

    1993-01-01

    The role and purpose of safety principles for nuclear power plants are discussed. A brief information is presented on safety objectives as given in the INSAG documents. The possible linkage is discussed between the two mentioned elements of nuclear safety and safety culture. Safety culture is a rather new concept and there is more than one interpretation of the definition given by INSAG. The defence in depth is defined by INSAG as a fundamental principle of safety technology of nuclear power. Discussed is the overall strategy for safety measures, and features of nuclear power plants provided by the defence-in-depth concept. (Z.S.) 7 refs

  2. Relative costs to nuclear plants: international experience

    International Nuclear Information System (INIS)

    Souza, Jair Albo Marques de

    1992-03-01

    This work approaches the relative costs to nuclear plants in the Brazil. It also presents the calculation methods and its hypothesis to determinate the costs, and the nacional experience in costs of investment, operating and maintenance of the nuclear plants

  3. EPRI nuclear power plant decommissioning technology program

    International Nuclear Information System (INIS)

    Kim, Karen S.; Bushart, Sean P.; Naughton, Michael; McGrath, Richard

    2011-01-01

    The Electric Power Research Institute (EPRI) is a non-profit research organization that supports the energy industry. The Nuclear Power Plant Decommissioning Technology Program conducts research and develops technology for the safe and efficient decommissioning of nuclear power plants. (author)

  4. Environmental survey around EDF nuclear power plants

    International Nuclear Information System (INIS)

    Foulquier, L.

    1992-01-01

    Description of various types of environmental test carried out under the responsibility of the Operator of nuclear power plants in France, with taking Fessenheim nuclear power plant as an example: permanent monitoring of radioactivity, periodic radioecological assessments, main results of measurements taken, showing that there are no detectable effects of the plant on the environment, policy of openness by publication of these results

  5. In-plant reliability data base for nuclear power plant components: data collection and methodology report

    International Nuclear Information System (INIS)

    Drago, J.P.; Borkowski, R.J.; Pike, D.H.; Goldberg, F.F.

    1982-07-01

    The development of a component reliability data for use in nuclear power plant probabilistic risk assessments and reliabiilty studies is presented in this report. The sources of the data are the in-plant maintenance work request records from a sample of nuclear power plants. This data base is called the In-Plant Reliability Data (IPRD) system. Features of the IPRD system are compared with other data sources such as the Licensee Event Report system, the Nuclear Plant Reliability Data system, and IEEE Standard 500. Generic descriptions of nuclear power plant systems formulated for IPRD are given

  6. Maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Lashgari, Farbod.

    1995-01-01

    This paper is about maintenance of nuclear power plants. In part one, the outage management of nuclear power plants has described. Meaning of the outage and objectives of outage management is given in introduction. The necessity of a long-term outage strategy is shown in chapter one. The main parts of an outage are as follows: Planning; Preparation; Execution, Each of them and also post-outage review have been explained in the followed chapters. Part two deals with technical details of main primary components of nuclear power plant type WWER. After an introduction about WWER reactors, in each chapter first the general and detailed description of main primary components has given and then their maintenance schedules and procedures. Chapter about reactor and steam generator is related to both types of WWER-440 and WWER-1000, but chapter about reactor coolant pump has specified to WWER-1000 to be more in details.(author)

  7. Financial analysis of large versus small nuclear power plants

    International Nuclear Information System (INIS)

    Louh, R.F.; Becker, M.; Wicks, F.

    1986-01-01

    There have been no new orders for nuclear plants and many nuclear plants under construction have been cancelled in recent years in the United States. Financing problems have been a major factor in this slow down of new nuclear plant activity. Meanwhile, the nuclear plants that have been completed have been operating cost effectively and yielding fossil fuel conservation and air quality benefits. Smaller plants have been designed in the past for the purpose of penetrating markets in developing countries and countries with relatively small utility systems. This paper examines the question of whether these smaller plants would be a viable option to large nuclear plants in the United States. Although the smaller plants are estimated to have a somewhat higher capital cost on a $/k W basis, they have the potential advantage of a lower total financial committment. The computational tools required for this evaluation are optimal generation planning and financial simulation programs and the corresponding generation and financial data bases for a variety of systems

  8. Cost savings from extended life nuclear plants

    International Nuclear Information System (INIS)

    Forest, L.R. Jr.; Deutsch, T.R.; Schenler, W.W.

    1988-09-01

    This study assesses the costs and benefits of nuclear power plant life extension (NUPLEX) for the overall US under widely varying economic assumptions and compares these with alternative new coal- fired plants (NEWCOAL). It is found that NUPLEX saves future electricity consumers more than 3 cents/-kwh compared with NEWCOAL. The NUPLEX costs and benefits for existing individual US nuclear power plants under base-line, or most likely, assumptions are assessed to determine the effects of the basic plant design and plant age. While benefits vary widely, virtually all units would have a positive benefit from NUPLEX. The study also presents a cost-benefit analysis of the nuclear industry's planned advanced light water reactor (ALWR). It is concluded that ALWR offers electrical power at a substantially lower cost than NEWCOAL. 9 refs., 6 figs

  9. Cost benefit justification of nuclear plant reliability improvement

    International Nuclear Information System (INIS)

    El-Sayed, M.A.H.; Abdelmonem, N.M.

    1985-01-01

    The design of the secondary steam loop of the nuclear power plant has a significant effect on the reliability of the plant. Moreover, the necessity to cool a reactor safely has increased the reliability demanded from the system. The rapidly rising construction costs and fuel prices in recent years have stimulated a great deal in optimizing the productivity of a nuclear power plant through reliability improvement of the secondary steamloop and the reactor cooling system. A method for evaluating the reliability of steam loop and cooling system of a nuclear power plant is presented. The method utilizes the cut-set technique. The developed method can be easily used to show to what extent the overall reliability of the nuclear plant is affected by the possible failures in the steam and cooling subsystem. A model for calculating the increase in the nuclear plant productivity resulting from a proposed improvement in the two subsystems reliability is discussed. The model takes into account the capital cost of spare parts for several components, replacement energy, operating and maintenance costs

  10. Beloyarsk Nuclear Power Plant

    International Nuclear Information System (INIS)

    1997-01-01

    The Beloyarsk Nuclear Power Plant (BNPP) is located in Zarechny, approximately 60 km east of Ekaterinberg along the Trans-Siberian Highway. Zarechny, a small city of approximately 30,000 residents, was built to support BNPP operations. It is a closed city to unescorted visitors. Residents must show identification for entry. BNPP is one of the first and oldest commercial nuclear power plants in Russia and began operations in 1964. As for most nuclear power plants in the Russian Federation, BNPP is operated by Rosenergoatom, which is subordinated to the Ministry of Atomic Energy of the Russian Federation (Minatom). BNPP is the site of three nuclear reactors, Units 1, 2, and 3. Units 1 and 2, which have been shut-down and defueled, were graphite moderated reactors. The units were shut-down in 1981 and 1989. Unit 3, a BN-600 reactor, is a 600 MW(electric) sodium-cooled fast breeder reactor. Unit 3 went on-line in April 1980 and produces electric power which is fed into a distribution grid and thermal power which provides heat to Zarechny. The paper also discusses the SF NIKIET, the Sverdiovsk Branch of NIKIET, Moscow, which is the research and development branch of the parent NIKEIT and is primarily a design institute responsible for reactor design. Central to its operations is a 15 megawatt IVV research reactor. The paper discusses general security and fissile material control and accountability at these two facilities

  11. About a hypothetical terrorist attack on a nuclear power plant

    International Nuclear Information System (INIS)

    2001-10-01

    After the terrorism attack on the World Trade Center, a record number ( two thirds) of US citizens favour the use of nuclear energy and consider nuclear plants to be safe. At the same time 59% definitely support building more nuclear plants, less than in March during the Californian crisis, but more than earlier., Most american citizens ( 84%) continue to support licence renewal for nuclear plants and 72 % agree with keeping the option open to build new nuclear plants in the future. The strongest supporters are those who have visited a nuclear plant or information centre. (N.C.)

  12. SECURE nuclear district heating plant

    International Nuclear Information System (INIS)

    Nilsson; Hannus, M.

    1978-01-01

    The role foreseen for the SECURE (Safe Environmentally Clean Urban REactor) nuclear district heating plant is to provide the baseload heating needs of primarily the larger and medium size urban centers that are outside the range of waste heat supply from conventional nuclear power stations. The rationale of the SECURE concept is that the simplicity in design and the inherent safety advantages due to the use of low temperatures and pressures should make such reactors economically feasible in much smaller unit sizes than nuclear power reactors and should make their urban location possible. It is felt that the present design should be safe enough to make urban underground location possible without restriction according to any criteria based on actual risk evaluation. From the environmental point of view, this is a municipal heat supply plant with negligible pollution. Waste heat is negligible, gaseous radioactivity release is negligible, and there is no liquid radwaste release. Economic comparisons show that the SECURE plant is competitive with current fossil-fueled alternatives. Expected future increase in energy raw material prices will lead to additional energy cost advantages to the SECURE plant

  13. Accidents with nuclear power plants, ch. 11

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    A recalculation of the consequences of nuclear power plant accidents is presented taking into account different parameters or different quantities than those usually accepted. A case study of a nuclear power plant planned for the Eems-river estuary in the Netherlands is presented

  14. Medical consequences of a nuclear plant accident

    International Nuclear Information System (INIS)

    Olsson, S.E.; Reizenstein, P.; Stenke, L.

    1987-01-01

    The report gives background information concerning radiation and the biological medical effects and damages caused by radiation. The report also discusses nuclear power plant accidents and efforts from the medical service in the case of a nuclear power plant accident. (L.F.)

  15. Investigation of human system interface design in nuclear power plant

    International Nuclear Information System (INIS)

    Feng Yan; Zhang Yunbo; Wang Zhongqiu

    2012-01-01

    The paper introduces the importance of HFE in designing nuclear power plant, and introduces briefly the content and scope of HFE, discusses human system interface design of new built nuclear power plants. This paper also describes human system interface design of foreign nuclear power plant, and describes in detail human system interface design of domestic nuclear power plant. (authors)

  16. Risk perception among nuclear power plant personnel: A survey

    International Nuclear Information System (INIS)

    Kivimaeki, M.; Kalimo, R.

    1993-01-01

    This study investigated risk perception, well-being, and organizational commitment among nuclear power plant personnel. The study group, 428 employees from a nuclear power plant, completed a questionnaire which included the same questions as those in previous surveys on risk perception of lay persons and industrial workers. Hazards at work were not seen as a sizable problem by nuclear power plant personnel. The study group estimated the safety of nuclear power plants better and the possibility of a serious nuclear accident as more unlikely than the general public. Compared to employees in other industrial companies, the overall perceived risks at work among plant personnel did not exceed the respective perceptions of the reference groups. Risk-related attitudes did not explain well-being among plant personnel, but the relationship between the perceived probability of a serious nuclear accident at work and organizational commitment yielded to a significant correlation: Those plant workers who estimated the likelihood of an accident higher were less committed to the organization. 21 refs., 2 tabs

  17. A trend to small nuclear power plants?

    International Nuclear Information System (INIS)

    Lameira, Fernando Soares

    2000-01-01

    The release of fossil fuel greenhouse gases and the depletion of cheap oil reserves outside the Persic Gulf suggest a promising scenario for the future of nuclear power. But the end of the Cold War, the crisis of the state, axiological questions and globalization may lead to a marked for small power plants. The purpose of this paper is to analyze these factors, since they are not always considered all together in the future scenarios for nuclear power. It is concluded that the current evolutionary trend of nuclear power projects toward big plants may become one of the main barriers for the introduction of new plants in the future. It is suggested that a combination of fission reactors with technologies unavailable in the 1950's, when the design characteristics of the current nuclear power plants were established, could be considered to overcome this barrier. (author)

  18. Space nuclear reactor power plants

    International Nuclear Information System (INIS)

    Buden, D.; Ranken, W.A.; Koenig, D.R.

    1980-01-01

    Requirements for electrical and propulsion power for space are expected to increase dramatically in the 1980s. Nuclear power is probably the only source for some deep space missions and a major competitor for many orbital missions, especially those at geosynchronous orbit. Because of the potential requirements, a technology program on space nuclear power plant components has been initiated by the Department of Energy. The missions that are foreseen, the current power plant concept, the technology program plan, and early key results are described

  19. Nuclear power plants and their insurances

    International Nuclear Information System (INIS)

    Schludi, H.N.

    1984-01-01

    From the commencement of building to the time of decommissioning of nuclear power plants, the insurances provide continuous coverage, i.e. for construction, nuclear liability, nuclear energy hazards insurance, fire insurance, machinery insurance. The respective financial security is quantified. (DG) [de

  20. Fire protection in nuclear power plants

    International Nuclear Information System (INIS)

    1992-01-01

    The Code on Design (Safety Series 50-C-D (Rev. 1)) within the NUSS (Nuclear Safety Standards) programme of the IAEA points out the necessity of measures for protecting plant items which are important to safety against fires of internal and external origin. Experience of the past two decades in the operation of nuclear power plants and modern analysis techniques confirm that fire may be a real threat to nuclear safety and should receive adequate attention from the beginning of the design process throughout the life of the plant. Within the framework of the NUSS programme, a Safety Guide on fire protection had therefore been developed to enlarge on the general requirements given in the Code. Since its first publication in 1979, there has been considerable development in protection technology and analysis methods and after the Chernobyl accident it was decided to revise the existing Guide. The present Safety Guide is intended to advise designers, safety assessors and regulators on the concept of fire protection in the design of nuclear power plants and on recommended ways of implementing the concept in some detail in practice. Figs, 1 tab

  1. Passive Nuclear Plants Program (UPDATE)

    International Nuclear Information System (INIS)

    Chimeno, M. A.

    1998-01-01

    The light water passive plants program (PCNP), today Advanced Nuclear Power Plants Program (PCNA), was constituted in order to reach the goals of the Spanish Electrical Sector in the field of advanced nuclear power plants, optimize the efforts of all Spanish initiatives, and increase joint presence in international projects. The last update of this program, featured in revision 5th of the Program Report, reflects the consolidation of the Spanish sector's presence in International programs of the advanced power plants on the basis of the practically concluded American ALWR program. Since the beginning of the program , the PCNP relies on financing from the Electrical sector, Ocide, SEPI-Endesa, Westinghouse, General Electric, as well as from the industrial cooperators, Initec, UTE (Initec- Empresarios Agrupados), Ciemat, Enusa, Ensa and Tecnatom. The program is made up of the following projects, already concluded: - EPRI's Advanced Light Water Plants Certification Project - Westinghouse's AP600 Project - General Electric's SBWR Project (presently paralyzed) and ABWR project Currently, the following project are under development, at different degrees of advance: - EPP project (European Passive Plant) - EBWR project (European Advanced Boiling Water Reactor)

  2. Classification of nuclear plant cost to energy

    International Nuclear Information System (INIS)

    Long, G.A.

    1983-01-01

    In order to understand why the fixed-cost/variable-cost method of classifying nuclear plant costs can lead to rate discontinuities, the author must examine the factors which lead to the decision to build a nuclear power plant and the interrelationship between demand (KW) and energy (KWH). The problems and inequities associated with the nuclear plants can be avoided by recognizing that fixed costs are related to both demand and energy and by using a costing methodology which closely relates to the functional purpose of the plant. Generally, this leads to classifying fixed costs of nuclear plants primarily to the energy function in an embedded cost-of-service study and through either implicit or explicit recognition of fuel savings in a marginal cost study. The large rate discontinuities which occurred in the scenario can be resolved. Costs associated with demand or energy charges remain relatively stable compared to actual capacity costs and customers would not experience large changes in their bills due solely to a particular costing convention

  3. 76 FR 75771 - Emergency Planning Guidance for Nuclear Power Plants

    Science.gov (United States)

    2011-12-05

    ... Guidance for Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. ACTION: Issuance of NUREG... Support of Nuclear Power Plants;'' NSIR/DPR-ISG-01, ``Interim Staff Guidance Emergency Planning for Nuclear Power Plants;'' and NUREG/CR-7002, ``Criteria for Development of Evacuation Time Estimate Studies...

  4. Environmental and security challenges of nuclear plants

    International Nuclear Information System (INIS)

    Omar, A.S.

    2014-01-01

    The world population increase, the acceleration of global requirement for development and the need to expand energy production, have led to the depletion of natural resources. The international efforts are increasing to get clean, safe and economical energy sources . The electricity generated from nuclear energy considers less polluting and high economic competitiveness as well as reliability and efficiency. The nuclear power plants projects face significant challenges, especially after two major accidents, in Chernobyl 1986 and Fukushima 2011 including the fears of radiation effects, nuclear waste management and nuclear proliferation issues, as well as the lack of public acceptance. So those bodies interested in operating nuclear power plants work to increase nuclear safety standards, review the nuclear facilities safety, know the strict application of laws, seek to prove the economic competitiveness, maintain environmental security, assist in the nonproliferation regime and gain public acceptance. This article discusses the most important environmental and security challenges of nuclear power plants. It highlights the importance of the peaceful uses of nuclear energy as a source of sustainable development and environmental security. It also offers a number of recommendations to support the Arab countries trend towards the inclusion of nuclear energy option within their national programs to generate electricity. (author)

  5. Human factors in nuclear power plant operations

    International Nuclear Information System (INIS)

    Swain, A.D.

    1980-08-01

    This report describes some of the human factors problems in nuclear power plants and the technology that can be employed to reduce those problems. Many of the changes to improve the human factors in existing plants are inexpensive, and the expected gain in human reliability is substantial. The human factors technology is well-established and there are practitioners in most countries that have nuclear power plants

  6. Power generation by nuclear power plants

    International Nuclear Information System (INIS)

    Bacher, P.

    2004-01-01

    Nuclear power plays an important role in the world, European (33%) and French (75%) power generation. This article aims at presenting in a synthetic way the main reactor types with their respective advantages with respect to the objectives foreseen (power generation, resources valorization, waste management). It makes a fast review of 50 years of nuclear development, thanks to which the nuclear industry has become one of the safest and less environmentally harmful industry which allows to produce low cost electricity: 1 - simplified description of a nuclear power generation plant: nuclear reactor, heat transfer system, power generation system, interface with the power distribution grid; 2 - first historical developments of nuclear power; 3 - industrial development and experience feedback (1965-1995): water reactors (PWR, BWR, Candu), RBMK, fast neutron reactors, high temperature demonstration reactors, costs of industrial reactors; 4 - service life of nuclear power plants and replacement: technical, regulatory and economical lifetime, problems linked with the replacement; 5 - conclusion. (J.S.)

  7. The fifth Finnish national aerosol symposium

    International Nuclear Information System (INIS)

    Mikkanen, P.; Haemeri, K.; Kauppinen, E.

    1993-01-01

    The Fifth Finnish Aerosol Symposium was held June 1-3, 1993. Symposium is jointly organized by FAAR, Aerosol Technology Group of Technical Research Centre of Finland and Helsinki University, Department of Physics. Aerosols, the suspensions of solid and liquid particles and gases, are receiving increasing importance in many areas of science and technology. These include industrial hygiene, ambient and indoor air pollution, pollution control technologies, cloud physics, nuclear safety engineering, combustion science and engineering, clean manufacturing technologies and material processing. The importance of aerosol issues during the development of advanced fuel conversion and material processing technologies can be realized when looking at the numerous papers presented on these topics at the Symposium

  8. Nuclear material control systems for nuclear power plants

    International Nuclear Information System (INIS)

    1975-06-01

    Paragraph 70.51(c) of 10 CFR Part 70 requires each licensee who is authorized to possess at any one time special nuclear material in a quantity exceeding one effective kilogram to establish, maintain, and follow written material control and accounting procedures that are sufficient to enable the licensee to account for the special nuclear material in his possession under license. While other paragraphs and sections of Part 70 provide specific requirements for nuclear material control systems for fuel cycle plants, such detailed requirements are not included for nuclear power reactors. This guide identifies elements acceptable to the NRC staff for a nuclear material control system for nuclear power reactors. (U.S.)

  9. Owners of nuclear power plants

    International Nuclear Information System (INIS)

    Wood, R.S.

    1991-07-01

    This report indicates percentage ownership of commercial nuclear power plants by utility companies. The report includes all plants operating, under construction, docketed for NRC safety and environmental reviews, or under NRC antitrust review, but does not include those plants announced but not yet under review or those plants formally cancelled. Part 1 of the report lists plants alphabetically with their associated applicants or licensees and percentage ownership. Part 2 lists applicants or licensees alphabetically with their associated plants and percentage ownership. Part 1 also indicates which plants have received operating licenses (OLS)

  10. The financing of nuclear power plants

    International Nuclear Information System (INIS)

    2009-01-01

    Many countries have recognised that greater use of nuclear power could play a valuable role in reducing carbon dioxide emissions. However, given the high capital cost and complexity of nuclear power plants, financing their construction often remains a challenge. This is especially true where such financing is left to the private sector in the context of competitive electricity markets. This study examines the financial risks involved in investing in a new nuclear power plant, how these can be mitigated, and how projects can be structured so that residual risks are taken by those best able to manage them. Given that expansion of nuclear power programmes will require strong and sustained government support, the study highlights the role of governments in facilitating and encouraging investment in new nuclear generating capacity

  11. Pre-fire planning for nuclear power plants

    International Nuclear Information System (INIS)

    Talbert, J.H.

    1980-01-01

    Regardless of the fire prevention measures which are taken, plant experience indicates that fires will occur in a nuclear power plant. When a fire occurs, the plant staff must handle the fire emergency. Pre-fire planning is a method of developing detailed fire attack plans and salvage operations to protect equipment from damage due to fire and fire fighting operations. This paper describes the purpose and use of a pre-fire plan to achieve these goals in nuclear power plants

  12. List of the world's nuclear power plants

    International Nuclear Information System (INIS)

    Kempken, M.

    1984-01-01

    This list published once a year presents, subdivided into countries, data on all nuclear power plants in operation, under construction, or for which a contract has been placed, referring to the following aspects: Year the contract has been placed, name and/or size, owner or operator, design type, manufacturers, net output, first year of commercial operation, and total electricity output up to the data June 30, 1984. Two additional tables present a survey on the world's nuclear power plants, also grouped by countries, and the largest commercially used nuclear power plants of the world. (UA) [de

  13. Nuclear power plants: 2005 atw compact statistics

    International Nuclear Information System (INIS)

    Anon.

    2006-01-01

    Nuclear power plants were available for power supply and under construction, respectively, in 32 countries of the world as per end of 2005. A total of 444 nuclear power plants, i.e. three plants more than at the end of 2004, with an aggregate gross power of approx. 389 GWe and an aggregate net power of 370 GWe, respectively, were in operation in 31 countries. The available capacity of nuclear power plants increased by some 4,5 GWe as a result of the capacities added by the four newly commissioned units of Higashidori 1 (Japan), Shika 2 (Japan), Tarapur 4 (India), and Tianwan 1 (China). In addition, unit A-1 of the Pickering nuclear power station in Canada, with 825 MWe, was restarted after a downtime of several years. Two plants were decommissioned for good in 2005: Obrigheim in Germany, and Barsebaeck 2 in Sweden. 23 nuclear generating units, i.e. one unit more than in late 2004, with an aggregate gross power of approx. 19 GWe were still under construction in nine countries by late 2005. In Pakistan, construction of a new project, Chasnupp 2, was started; in China, construction was begun of two units, Lingao Phase 2, units 3 and 4, and in Japan, the Shimane 3 generating unit is being built. (orig.)

  14. Nuclear Power Plant 1996

    International Nuclear Information System (INIS)

    1997-01-01

    Again this year, our magazine presents the details of the conference on Spanish nuclear power plant operation held in February and that was devoted to 1996 operating results. The Protocol for Establishment of a New Electrical Sector Regulation that was signed last December will undoubtedly represent a new challenge for the nuclear industry. By clearing stating that current standards of quality and safety should be maintained or even increased if possible, the Protocol will force the Sector to improve its productivity, which is already high as demonstrated by the results of the last few years described during this conference and by recent sectorial economic studies. Generation of a nuclear kWh that can compete with other types of power plants is the new challenge for the Sector's professionals, who do not fear the new liberalization policies and approaching competition. Lower inflation and the resulting lower interest rates, apart from being representative indices of our economy's marked improvement, will be very helpful in facing this challenge. (Author)

  15. Pulsed nuclear power plant

    International Nuclear Information System (INIS)

    David, C.V.

    1986-01-01

    This patent describes a nuclear power plant. This power plant consists of: 1.) a cavity; 2.) a detonatable nuclear device in a central region of the cavity; 3.) a working fluid inside of the cavity; 4.) a method to denote a nuclear device inside of the cavity; 5.) a mechanical projection from an interior wall of the cavity for recoiling to absorb a shock wave produced by the detonation of the nuclear device and thereby protecting the cavity from damage. A plurality of segments defines a shell within the cavity and a plurality of shock absorbers, each connecting a corresponding segment to a corresponding location on the wall of the cavity. Each of these shock absorbers regulate the recoil action of the segments; and 6.) means for permitting controlled extraction of a quantity of hot gases from the cavity produced by the vaporization of the working fluid upon detonation of the nuclear device. A method of generating power is also described. This method consists of: 1.) introducing a quantity of water in an underground cavity; 2.) heating the water in the cavity to form saturated steam; 3.) detonating a nuclear device at a central location inside the cavity; 4.) recoiling plate-like elements inside the cavity away from the central location in a mechanically regulated and controlled manner to absorb a shock wave produced by the nuclear device detonation and thereby protect the underground cavity against damage; 5.) extracting a quantity of superheated steam produced by the detonation of the nuclear device; and 6.) Converting the energy in the extracted superheated steam into electrical power

  16. Seismic design of nuclear power plants - an assessment

    International Nuclear Information System (INIS)

    Howard, G.E.; Ibanez, P.; Smith, C.B.

    1976-01-01

    This paper presents a review and evaluation of the design standards and the analytical and experimental methods used in the seismic design of nuclear power plants with emphasis on United States practice. Three major areas were investigated: (a) soils, siting, and seismic ground motion specification; (b) soil-structure interaction; and (c) the response of major nuclear power plant structures and components. The purpose of this review and evaluation program was to prepare an independent assessment of the state-of-the-art of the seismic design of nuclear power plants and to identify seismic analysis and design research areas meriting support by the various organizations comprising the 'nuclear power industry'. Criteria used for evaluating the relative importance of alternative research areas included the potential research impact on nuclear power plant siting, design, construction, cost, safety, licensing, and regulation. (Auth.)

  17. Discussion on anti-flood renovation of operational nuclear power plants

    International Nuclear Information System (INIS)

    Chen Jiangang; Chen Haiqiao; Zhang Lihan; Wang Sen; Liu Shifeng

    2014-01-01

    The design of nuclear power plants on anti-flood performance was only based on design basis condition in China. The Fukushima nuclear accident revealed the possibility of suffering flood under beyond design basis condition, which caused the continuously deterioration of Fukushima nuclear accident. After the accident, China national nuclear safety regulators proposed new requirements on performance of anti-flood of nuclear power plants. Then, Qinshan Phase II carried out research of anti-flood technology. This paper introduced the background, research and development of anti-flood renovation technology for important safety buildings of Qinshan Phase II, and discussed the necessary for improvement of anti-flood capacity of nuclear power plants and relative measures in China, which is helpful to improve anti-flood performance of operational nuclear power plants and nuclear power plants under construction. (authors)

  18. Preparation for commissioning of nuclear plant with reference to British Nuclear Fuels Plc fuel handling plant project

    International Nuclear Information System (INIS)

    Bamber, D.R.

    1987-01-01

    The new Fuel Handling Plant at British Nuclear Fuels Sellafield is part of a Pound 550M complex which provides facilities for the receipt, storage and mechanical preparation of both Magnox and A.G.R. fuel. The plant is very large and complex with considerable use of computer based process control systems, providing for physical and nuclear safety. The preparation of such plant for active commissioning necessitates a great many physical checks and technical evaluations in support of its safety case. This paper describes arrangements for plant commissioning checks, against the regulatory framework and explains the physical preparations necessary for their timely accomplishment. (author)

  19. Preparation for commissioning of nuclear plant with reference to British Nuclear Fuels Plc fuel handling plant project

    International Nuclear Information System (INIS)

    Bamber, D.

    1987-01-01

    The new Fuel Handing Plant at British Nuclear Fuels Sellafield is part of a Pound 550M complex which provides facilities for the receipt, storage and mechanical preparation of both magnox and A.G.R. fuel. The plant is very large and complex with considerable use of computer based process control systems, providing for physical and nuclear safety. The preparation of such plant for ''active'' commissioning necessitates a great many physical checks and technical evaluations in support of its safety case. This paper describes arrangements for plant commissioning checks, against the regulatory framework and explains the physical preparations necessary for their timely accomplishment. (author)

  20. Nuclear power plant life management and longer-term operation

    International Nuclear Information System (INIS)

    2006-01-01

    This book, prepared by NEA member country experts, contains data and analyses relevant to nuclear power plant life management and the plants' extended, longer-term operation (LTO). It addresses technical, economic and environmental aspects and provides insights into the benefits and challenges of plant life management and LTO. It will be of interest to policy makers and senior managers in the nuclear power sector and governmental bodies involved in nuclear power programme design and management. The data and information on current trends in nuclear power plant life management will be useful to researchers and analysts working in the field of nuclear energy system assessment. (authors)

  1. Optimal estimation and control in nuclear power plants

    International Nuclear Information System (INIS)

    Purviance, J.E.; Tylee, J.L.

    1982-08-01

    Optimal estimation and control theories offer the potential for more precise control and diagnosis of nuclear power plants. The important element of these theories is that a mathematical plant model is used in conjunction with the actual plant data to optimize some performance criteria. These criteria involve important plant variables and incorporate a sense of the desired plant performance. Several applications of optimal estimation and control to nuclear systems are discussed

  2. Radiological protection in nuclear power plants

    International Nuclear Information System (INIS)

    Zorrilla R, S.

    2008-12-01

    This presentation sharing experiences which correspond to the nuclear power plant of Laguna Verde. This nuclear power plant is located at level 2 of four possible, in the classification performance of the World Association of Nuclear Operators (WANO), which means the mexican nuclear power plant is classified in terms of its performance indicators and above the average achieved by their counterparts americans and canadians. In the national context, the nuclear power plant of Laguna Verde has also been honored with several awards such as the National Quality Award, the Clean Industry Certificate, the distinction of Environmental Excellence and others of similar importance. For the standards of WANO, the basic idea is that there are shortcomings in one of nuclear power plant concern to all partners. The indicators used for the classification will always go beyond more compliance with regulations, which are assumed, and rather assume come or a path to excellence. Among the most important indicators are: the collective dose, the percentage of areas declared as contaminated, the number, type and tendency of contamination personal cases, the number of dosimetry alarms, the number of unplanned exposures, loss control of high radiation areas and the release of contaminated material outside the restricted areas. Furthermore, as already indicated, nuclear power plants are of special care situations, such as, carrying out work in areas with radiation fields of more than 15 mSv h -1 , the movement of spent fuel in the reload floor. The consideration of the minimum total effective dose equivalent as a criterion for prescribing tools that reduce exposures, but may increase the external cases of contaminated casualties, the experience in portals such as workers subject to radiology, where exposure in industrial radiography, and so on. Special mention deserve the conditions generated during fuel reload stops, which causes a massive personnel movement, working simultaneously on

  3. U.S. Nuclear Power Reactor Plant Status

    Data.gov (United States)

    Nuclear Regulatory Commission — Demographic data on U.S. commercial nuclear power reactors, including: plant name/unit number, docket number, location, licensee, reactor/containment type, nuclear...

  4. Vulnerability of the nuclear power plant in war conditions

    International Nuclear Information System (INIS)

    Stritar, A.; Mavko, B.

    1992-01-01

    In the summer 1991 the Nuclear Power Plant Krsko in Slovenia found itself in the area of military operations. This way probably the first commercial nuclear power plant, to which it was threatened with the air jet attack. A number of never before asked questions had to be answered by the operating staff and supporting organizations. In this paper some aspects of the nuclear power plant safety in war condition are described: the selection of the best plant operating state before the attack and the determination of plant system vulnerability. It was concluded, that the best operating mode, into which the plant should be brought before the attack, is the cold shutdown mode. The problem of Nuclear Power Plant safety in war conditions should be addressed in more detail in the future. (author) [sl

  5. Knowledge acquisition for nuclear power plant unit diagnostic system

    International Nuclear Information System (INIS)

    Li Xiaodong; Xi Shuren

    2003-01-01

    The process of acquiring knowledge and building a knowledge base is critical to realize fault diagnostic system at unit level in a nuclear power plant. It directly determines whether the diagnostic system can be applied eventually in a commercial plant. A means to acquire knowledge and its procedures was presented in this paper for fault diagnostic system in a nuclear power plant. The work can be carried out step by step and it is feasible in a commercial nuclear power plant. The knowledge base of the fault diagnostic system for a nuclear power plant can be built after the staff finish the tasks according to the framework presented in this paper

  6. Designing nuclear power plants for improved operation and maintenance

    International Nuclear Information System (INIS)

    1996-09-01

    The purpose of this publication is to compile demonstrated, experience based design guidelines for improving the operability and maintainability of nuclear power plants. The guidelines are for use principally in the design of new nuclear power plants, but should also be useful in upgrading existing designs. The guidelines derive from the experience of operating and maintaining existing nuclear power plants as well as from the design of recent plants. In particular these guidelines are based on and consistent with both the EPRI advanced Light Water Reactor Utility Requirements Document, Volume 1, and the European Utility Requirements for LWR Nuclear Power Plants. 6 refs, 1 fig

  7. Designing nuclear power plants for improved operation and maintenance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    The purpose of this publication is to compile demonstrated, experience based design guidelines for improving the operability and maintainability of nuclear power plants. The guidelines are for use principally in the design of new nuclear power plants, but should also be useful in upgrading existing designs. The guidelines derive from the experience of operating and maintaining existing nuclear power plants as well as from the design of recent plants. In particular these guidelines are based on and consistent with both the EPRI advanced Light Water Reactor Utility Requirements Document, Volume 1, and the European Utility Requirements for LWR Nuclear Power Plants. 6 refs, 1 fig.

  8. Nuclear power plants: 2013 atw compact statistics

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2014-03-15

    At the end of 2013, nuclear power plants were available for energy supply in 31 countries of the world. A total of 437 nuclear power plants were in operation with an aggregate gross power of approx. 393 GWe and an aggregate net power, respectively, of 372 GWe. This means that the number was unchanged compared to the previous year's number on 31 December 2012. The available gross power of nuclear power plants increased by approx. 2 GWe from 2012 to the end of 2013. In total 4 nuclear generating units were commissioned in 2013 in China (+2) and in the Republic Korea (+1). 6 nuclear generating units were decommissioned in 2013. Four units in the U.S.A. (-4) were shut down due to economical reasons. In Canada (-2) the operation status of 2 units was changed from long-term shutdown to permanently shutdown. 70 nuclear generating units with an aggregate gross power of approx. 73 GWe, were under construction in 15 countries end of 2013. New or continued projects are notified from (in brackets: number of new projects) China (+3), Belarus (+1), Rep. of Korea (+1) and the United Arab Emirates (+1). Some 115 new nuclear power plants are in the concrete project design, planning and licensing phases worldwide; on some of them, contracts have already been awarded. Another units are in their preliminary project phases. (orig.)

  9. Nuclear power plants: 2013 atw compact statistics

    International Nuclear Information System (INIS)

    Anon.

    2014-01-01

    At the end of 2013, nuclear power plants were available for energy supply in 31 countries of the world. A total of 437 nuclear power plants were in operation with an aggregate gross power of approx. 393 GWe and an aggregate net power, respectively, of 372 GWe. This means that the number was unchanged compared to the previous year's number on 31 December 2012. The available gross power of nuclear power plants increased by approx. 2 GWe from 2012 to the end of 2013. In total 4 nuclear generating units were commissioned in 2013 in China (+2) and in the Republic Korea (+1). 6 nuclear generating units were decommissioned in 2013. Four units in the U.S.A. (-4) were shut down due to economical reasons. In Canada (-2) the operation status of 2 units was changed from long-term shutdown to permanently shutdown. 70 nuclear generating units with an aggregate gross power of approx. 73 GWe, were under construction in 15 countries end of 2013. New or continued projects are notified from (in brackets: number of new projects) China (+3), Belarus (+1), Rep. of Korea (+1) and the United Arab Emirates (+1). Some 115 new nuclear power plants are in the concrete project design, planning and licensing phases worldwide; on some of them, contracts have already been awarded. Another units are in their preliminary project phases. (orig.)

  10. Data retrieval techniques for nuclear power plants

    International Nuclear Information System (INIS)

    Sozzi, G.L.; Dahl, C.C.; Gross, R.S.; Voeller, J.G. III

    1995-01-01

    Data retrieval, processing retrieved data, and maintaining the plant documentation system to reflect the as-built condition of the plant are challenging tasks for most existing nuclear facilities. The information management systems available when these facilities were designed and constructed are archaic by today's standards. Today's plant documentation systems generally include hard copy drawings and text, drawings in various CAD formats, handwritten information, and incompatible databases. These existing plant documentation systems perpetuate inefficiency for the plant technical staff in the performance of their daily activities. This paper discusses data retrieval techniques and tools available to nuclear facilities to minimize the impacts of the existing plant documentation system on plant technical staff productivity

  11. Dose reduction at nuclear power plants

    International Nuclear Information System (INIS)

    Baum, J.W.; Dionne, B.J.

    1983-01-01

    The collective dose equivalent at nuclear power plants increased from 1250 rem in 1969 to nearly 54,000 rem in 1980. This rise is attributable primarily to an increase in nuclear generated power from 1289 MW-y to 29,155 MW-y; and secondly, to increased average plant age. However, considerable variation in exposure occurs from plant to plant depending on plant type, refueling, maintenance, etc. In order to understand the factors influencing these differences, an investigation was initiated to study dose-reduction techniques and effectiveness of as low as reasonably achievable (ALARA) planning at light water plants. Objectives are to: identify high-dose maintenance tasks and related dose-reduction techniques; investigate utilization of high-reliability, low-maintenance equipment; recommend improved radioactive waste handling equipment and procedures; examine incentives for dose reduction; and compile an ALARA handbook

  12. Fiber optic applications in nuclear power plants

    International Nuclear Information System (INIS)

    Collette, P.; Kwapien, D.

    1984-01-01

    Fiber optic technology possesses many desirable attributes for applications in commercial nuclear power plants. The non-electrical nature of fiber optics is an important factor in an industry governed by federal safety regulations such as Class 1E isolation and separation criteria. Immunity from Electromagnetic Interference (EMI), an increasing industry problem area, is another significant characteristic. Because of the extremely wide bandwidth offered, fiber optics better addresses the data acquistion and communication requirements of the complex processes of a nuclear power plant. Potential for fiber optic sensor applications exists within the nuclear industry because their small size and physical flexibility allows access into normally inaccessible areas. They possess high accuracy and allow environmentally sensitive electronics to be remotely located. The purpose of this paper is to explore current applications for fiber optic technology in modern nuclear plants, document examples of present day usage in C-E plants and suggest possible future application areas

  13. Operating experience with nuclear power plants 2015. Pt. 1

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2016-07-01

    The VGB Technical Committee ''Nuclear Plant Operation'' has been exchanging operating experience about nuclear power plants for more than 30 years. Plant operators from several European countries are participating in the exchange. A report is given on the operating results achieved in 2015, events important to plant safety, special and relevant repair, and retrofit measures from Germany. The second part of this report will focus on nuclear power plant in Belgium, Finland, the Netherlands, Switzerland, and Spain.

  14. Nuclear Power Plants | RadTown USA | US EPA

    Science.gov (United States)

    2018-03-12

    Nuclear power plants produce electricity from the heat created by splitting uranium atoms. In the event of a nuclear power plant emergency, follow instructions from emergency responders and public officials.

  15. Nuclear electric power plants. [Journal, in Russian]. Atomnye elektricheskie stantsii

    Energy Technology Data Exchange (ETDEWEB)

    Voronin, L M [ed.

    1980-01-01

    Separate articles are concerned with experience gained in the planning, exploitation, and adjustment of nuclear power plants with channel reactors. An examination is made of measures to be taken for assuring equipment reliability for nuclear power plants during the planning stage. Also examined is the experience gained in the operation of the pilot plants of the Kursk and Chernobyl' nuclear power plants, and the Bilibin nuclear thermal electric power plant. Considerable attention is given to the reprocessing and disposal of radioactive waste, the quality control of metal ducts in nuclear power plants, and the development of methods and means of controlling technological processes and equipment. The journal is intended for engineering-technical personnel of power plants, power supply administrations, adjustment, repair, and planning organizations.

  16. Operating results 2015. Nuclear power plants. Pt. 1

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2016-05-15

    A report is given on the opening results achieved in 2015, events important to plant safety, special and relevant repair, and retrofit measures from nuclear power plants in Germany. Reports about nuclear power plants in Belgium, Finland, the Netherlands, Switzerland, and Spain will be published in further issue.

  17. Advanced construction methods for new nuclear power plants

    International Nuclear Information System (INIS)

    Bilbao y Leon, Sama; Cleveland, John; Moon, Seong-Gyun; Tyobeka, Bismark

    2009-01-01

    The length of the construction and commissioning phases of nuclear power plants have historically been longer than for conventional fossil fuelled plants, often having a record of delays and cost overruns as a result from several factors including legal interventions and revisions of safety regulations. Recent nuclear construction projects however, have shown that long construction periods for nuclear power plants are no longer the norm. While there are several inter-related factors that influence the construction time, the use of advanced construction techniques has contributed significantly to reducing the construction length of recent nuclear projects. (author)

  18. Alternative off-site power supply improves nuclear power plant safety

    International Nuclear Information System (INIS)

    Gjorgiev, Blaže; Volkanovski, Andrija; Kančev, Duško; Čepin, Marko

    2014-01-01

    Highlights: • Additional power supply for mitigation of the station blackout event in NPP is used. • A hydro power plant is considered as an off-site alternative power supply. • An upgrade of the probabilistic safety assessment from its traditional use is made. • The obtained results show improvement of nuclear power plant safety. - Abstract: A reliable power system is important for safe operation of the nuclear power plants. The station blackout event is of great importance for nuclear power plant safety. This event is caused by the loss of all alternating current power supply to the safety and non-safety buses of the nuclear power plant. In this study an independent electrical connection between a pumped-storage hydro power plant and a nuclear power plant is assumed as a standpoint for safety and reliability analysis. The pumped-storage hydro power plant is considered as an alternative power supply. The connection with conventional accumulation type of hydro power plant is analysed in addition. The objective of this paper is to investigate the improvement of nuclear power plant safety resulting from the consideration of the alternative power supplies. The safety of the nuclear power plant is analysed through the core damage frequency, a risk measure assess by the probabilistic safety assessment. The presented method upgrades the probabilistic safety assessment from its common traditional use in sense that it considers non-plant sited systems. The obtained results show significant decrease of the core damage frequency, indicating improvement of nuclear safety if hydro power plant is introduced as an alternative off-site power source

  19. Nuclear power plants: 2004 atw compact statistics

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    In late 2004, nuclear power plants were available for power supply or were under construction in 32 countries worldwide. A total of 441 nuclear power plants, i.e. two plants more than in late 2003, were in operation with an aggregate gross power of approx. 386 GWe and an aggregate net power, respectively, of 362 GWe, in 31 countries. The available capacity of nuclear power plants increased by approx. 5 GWe as a result of the additions by the six units newly commissioned: Hamaoka 5 (Japan), Ulchin 6 (Korea), Kalinin 3 (Russia), Khmelnitski 2 (Ukraine), Qinshan II-2 (People's Republic of China), and Rowno 4 (Ukraine). In addition, unit 3 of the Bruce A nuclear power plant in Canada with a power of 825 MWe was restarted after an outage of many years. Contrary to earlier plans, a recommissioning program was initiated for the Bruce A-1 and A-2 units, which are also down at present. Five plants were decommissioned for good in 2004; Chapelcross 1 to 4 with 50 MWe each in the United Kingdom, and Ignalina 1 with 1 300 MWe in Lithuania. 22 nuclear generating units with an aggregate gross power of 19 GWe in nine countries were under construction in late 2004. In India, construction work was started on a new project, the 500 MWe PFBR prototype fast breeder reactor. In France, the EDF utility announced its intention to build an EPR on the Flamanville site beginning in 2007. (orig.)

  20. Radiological characterization of nuclear plants under decommissioning

    International Nuclear Information System (INIS)

    Mincarini, M.

    1989-01-01

    In the present work a description of major problems encountered in qualitative and quantitative radiological characterization of nuclear plants for decommissioning and decontamination purpose is presented. Referring to several nuclear plant classes activation and contamination processes, direct and indirect radiological analysis and some italian significant experience are descripted

  1. U.S. nuclear plant statistics, 8th Edition

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    Wolf Creek was the lowest cost nuclear plant in 1992 according to the annual plant rankings in UDI's comprehensive annual statistical factbook for US nuclear power plants (operating, under construction, deferred, canceled or retired). The book covers operating and maintenance expenses for the past year (1992), annual and lifetime performance statistics, capitalization expenses and changes in capitalization, construction cost information, joint ownership of plants and canceled plants. First published for CY1984 statistics

  2. Anthroponyms in Finno-Permic Compound Plant Names

    Directory of Open Access Journals (Sweden)

    Igor V. Brodsky

    2017-07-01

    Full Text Available With reference to Finno-Permic languages (a branch of Finno-Ugric languages excluding Ugric languages, the article analyses compound names of plants (phytonyms containing Permic languages, which, inter alia, can be explained by the incompleteness of collected data. Most of phytonyms with anthroponymic elements are attested in the Finnish and Estonian languages, while in the other Finno-Permic languages such attestations are rare. The anthroponyms appearing in names of plants are divided into two groups: a personal names of Biblical origin (e.g. Finnish Aapraham, Aatam, Jeesus, Maaria, b other anthroponyms. In the first group, the most numerous are Balto-Fennic phytonyms with the names Johannes and Maria and their national variants. The name Johannes (Finnish Juhannus, Estonian Jaan is most often present in the names of herbaceous plants flourishing in the period of celebration of Saint John’s Eve. Traditionally, this feast is associated with numerous rites and customs in which some plants play a significant role. An interesting formal feature of Balto-Fennic deanthroponymic compound names of plants is alliteration, i.e. repetition of identical or similar sound clusters in the beginning of each part of the word, as in Finnish liisanlilukka ‘stone bramble,’ simonsien’ ‘chanterelle, girolle’.

  3. Construction-man hour estimation for nuclear power plants

    International Nuclear Information System (INIS)

    Paek, J.H.

    1987-01-01

    This study centers on a statistical analysis of the preliminary construction time, main construction time, and total construction man hours of nuclear power plants. The use of these econometric techniques allows the major man hour driving variables to be identified through multivariate analysis of time-series data on over 80 United States nuclear power plants. The analysis made in this study provides a clearer picture of the dynamic changes that have occurred in the man hours of these plants when compared to engineering estimates of man hours, and produces a tool that can be used to project nuclear power plant man hours

  4. Nuclear plant owners move closer to life extension

    International Nuclear Information System (INIS)

    Smith, D.J.

    1991-01-01

    A major debate is now underway about the safety of 40-year-old nuclear power plants. Under the Atomic Energy Act of 1954 a nuclear power plant's license is limited to a maximum of 40 years. Although the act permits the renewal of an operating license, it does not outline any standards or procedures for determining when or under what conditions a plant's operating license should be renewed. This paper reports that the Electric Power Research Institute (EPRI) and the U.S. Department of Energy (DOE) are co-sponsors of a program to demonstrate the license renewal process for two nuclear power plants - Yankee Atomic Electric's 175-MW Yankee PWR plant and Northern States Power's 536-MW Monticello BWR plant. The demonstration is known as the lead plant project. Yankee Atomic has already analyzed the plant's condition and evaluated aging using computer-based expert systems and the plant's operating experience. During these tests Yankee Atomic found embrittlement of the reactor vessel

  5. Nuclear plant analyzer desktop workstation

    International Nuclear Information System (INIS)

    Beelman, R.J.

    1990-01-01

    In 1983 the U.S. Nuclear Regulatory Commission (USNRC) commissioned the Idaho National Engineering Laboratory (INEL) to develop a Nuclear Plant Analyzer (NPA). The NPA was envisioned as a graphical aid to assist reactor safety analysts in comprehending the results of thermal-hydraulic code calculations. The development was to proceed in three distinct phases culminating in a desktop reactor safety workstation. The desktop NPA is now complete. The desktop NPA is a microcomputer based reactor transient simulation, visualization and analysis tool developed at INEL to assist an analyst in evaluating the transient behavior of nuclear power plants by means of graphic displays. The NPA desktop workstation integrates advanced reactor simulation codes with online computer graphics allowing reactor plant transient simulation and graphical presentation of results. The graphics software, written exclusively in ANSI standard C and FORTRAN 77 and implemented over the UNIX/X-windows operating environment, is modular and is designed to interface to the NRC's suite of advanced thermal-hydraulic codes to the extent allowed by that code. Currently, full, interactive, desktop NPA capabilities are realized only with RELAP5

  6. U.S. National and regional impacts nuclear plant life extension

    International Nuclear Information System (INIS)

    Makovick, L.; Fletcher, T.; Harrison, D.L.

    1987-01-01

    The purpose of this study was to evaluate the economic impacts of nuclear plant life extension on a national and regional level. Nuclear generating capacity is expected to reach 104 Gigawatts (119 units) in the 1994-1995 period. Nuclear units of the 1970 to 1980 vintage are expected to account for 96% of nuclear capacity. As operating licenses expire, a precipitous decline in nuclear capacity results, with an average of 5 gigawatts of capacity lost each year from 2010 to 2030. Without life extension, 95% of all nuclear capacity is retired between the years 2010 and 2030. Even with historically slow growth in electric demand and extensive fossil plant life extension, the need for new generating capacity in the 2010-2030 time period is eight times greater than installed nuclear capacity. Nuclear plant life extension costs and benefits were quantified under numerous scenarios using the DRI Electricity Market Model. Under a wide range of economic assumptions and investment requirements, nuclear plant life extension resulted in a net benefit to electricity consumers. The major source of net benefits from nuclear plant life extension results from the displacement of fossil-fired generating sources. In the most likely case, nuclear plant life extension provides a dollar 200 billion net savings through the year 2030. Regions with a large nuclear capacity share, newer nuclear units and relatively higher costs of alternative fuels benefit the most from life extension. This paper also discusses the importance of regulatory policies on nuclear plant life extension

  7. Surveillance robot for nuclear power plants

    International Nuclear Information System (INIS)

    White, J.R.; Harvey, H.W.; Satterlee, P.E. Jr.

    1985-01-01

    A demonstration project to determine the feasibility and cost-effectiveness of mobile surveillance robots in nuclear power plants is being conducted by the Remote Technology Corporation (REMOTEC) for the US Nuclear Regulatory Commission. Phase I of the project was completed in March 1984 and included a survey of currently used robotic equipment and the development of a robotics application methodology. Three Tennessee Valley Authority plants were analyzed to identify specific plant areas with a high potential for surveillance robotics. Based on these results, a number of robotic system applications were prepared and evaluated for cost-effectiveness. The system with the highest potential, a mobile surveillance robot, was selected for fabrication and in-plant demonstration testing in a phase II effort. The design, fabrication, and assembly of SURBOT has been completed and cold testing is in process. It will be installed at the Browns Ferry Nuclear Plant early in 1986 for demonstration testing. Current projections are that SURBOT can be used in approx.40 rooms within the auxiliary building and will have annual savings of over 100 person-rem exposure, 1000 sets of C-zone clothing, and 1000 person-hours of labor

  8. Safety in nuclear power plants

    International Nuclear Information System (INIS)

    Koeberlein, K.

    1987-01-01

    In nuclear power plants large amounts of radioactive fission products ensue from the fission of uranium. In order to protect the environment, the radioactive material is confined in multiple 'activity barriers' (crystal matrix of the fuel, fuel cladding, coolant boundary, safety containment, reactor building). These barriers are protected by applying a defense-in-depth concept (high quality requirements, protection systems which recognize and terminate operational incidents, safety systems to cope with accidents). In spite of a favorable safety record of German nuclear power plants it is obvious - and became most evident by the Chernobyl accident - that absolute safety is not achievable. At Chernobyl, however, design disadvantages of that reactor type (like positive reactivity feedback of coolant voiding, missing safety containment) played an important role in accident initiation and progression. Such features of the Russian 'graphite-moderated pressure tube boiling water reactor' are different from those of light water reactors operating in western countries. The essential steps of the waste management of the nuclear fuel cycle ('Entsorgung') are the interim storage, the shipment, and the reprocessing of the spent fuel and the final repository of radioactive waste. Reprocessing means the separation of fossil material (uranium, plutonium) from radioactive waste. Legal requirements for radiological protection of the environment, which are identical for nuclear power plants and reprocessing plant, are complied with by means of comprehensive filter systems. Safety problems of a reprocessing plant are eased considerably by the fact that system pressures, process temperatures and energy densities are low. In order to confine the radioactive waste from the biosphere for a very long period of time, it is to be discarded after appropriate treatment into the deep geological underground of salt domes. (orig./HP) [de

  9. Technical analysis of magneto-inductive crane cables in nuclear power plants. Application crane Cofrentes Nuclear Power Plant

    International Nuclear Information System (INIS)

    Gavilan Moreno, C. J.

    2010-01-01

    In 2009, the Cofrentes Nuclear Power Plant made a study about crane inspection techniques available on the market and other industries. The result was the location of the magneto-inductive technique inspection. Its use provides an objective assessment of the resistant section and; through these data; it could be made calculations as the maximum voltage allowed. Therefore, the technique is proven and available to all nuclear power plants.

  10. Introduction to Exxon nuclear fuel fabrication plant

    International Nuclear Information System (INIS)

    Schneider, R.A.

    1985-01-01

    The Exxon Nuclear low-enriched uranium fuel fabrication plant in Richland, Washington produces fuel assemblies for both pressurized water and boiling water reactors. The Richland plant was the first US bulk-handling facility selected by the IAEA for inspection under the US-IAEA Safeguards Agreement. The plant was under IAEA inspection from March 1981 through October 1983. This text provides a written description of the plant layout, operation and process. The text also includes a one ton-a-day model (or reference) plant which was adapted from the Exxon Nuclear plant. The Model Plant provides a generic example of a low-enriched uranium (LEU) bulk-handling facility. The Model Plant is used to illustrate in a more quantitative way some of the key safeguards requirements for a bulk-handling facility

  11. Review of nuclear power plant systems

    International Nuclear Information System (INIS)

    Doehler

    1980-01-01

    This presentation starts with a brief description of the Technischer Ueberwachungs-Verein (TUeV) and its main activities in the field of technical assessments. The TUeV-organisation is in general the assessor who performs the review if nuclear power plant systems, structures and equipment. All aspects relating to the safe operation of nuclear power plants are assessed by the TUeV. This paper stresses the review of the design of nuclear power plant systems and structures. It gives an outline on the procedure of an assessment, starting with the regulatory requirements, going into the papers of the applicant and finally ending with the TUeV-appraisal. This procedure is shown using settlement measuring requirements as an example. The review of the design of mechanical structures such as pipes, valves, pump and vessels is shown in detail. (RW)

  12. Views on quality assurance at Finnish and Swedish nuclear power plants and at Halden Reactor; Syn paa kvalitetssaekring vid finlaendska och svenska kaernkraftverk samt vid Haldenreaktorn

    Energy Technology Data Exchange (ETDEWEB)

    Hammar, L.; Lidh, B. [ES-konsult (Sweden); Wahlstroem, B.; Reiman, T. [VTT Automation (Finland)

    2001-06-01

    The paper reports on a study within the Nordic Nuclear Safety Research, NKS on quality systems at nuclear installations in Finland, Norway and Sweden. In the study a total of 74 people at the NPPs in Barsebaeck, Forsmark, Loviisa, Olkiluoto, Oskarshamn and Ringhals, and at the research reactor in Halden were interviewed in the period 30 August to 13 December 2000 concerning their views in regard of quality and quality systems. The study was concluded with a seminar held in the Ringhals nuclear power plant in Januar 2001. The study covered a number of aspects in regard of quality management, including the quality concept, quality systems, topical quality issues and approaches, rules and procedures, competency and training, the process approach to quality management, the promotion of quality consciousness and future prospects. The study reflects the significant progress made in the management of quality in nuclear power in the Nordic countries since the early phase in the seventies. The most distinctive characteristic of today's approach to quality is seen in that responsibility for the quality is assumed directly in conjunction with the working processes. It could be noted that the work patterns at the nuclear installations have been largely modified during the recent years as a result of persistent endeavours to continuously improve the quality of operation. Challenges were seen in currently reduced revenues due to descending electricity prices and the likely prospect of further increased regulatory safety requirements. The report is aimed for those working with quality issues at the nuclear power plants as well as for those interested in quality management in general or in the safety aspects of nuclear power in particular. (au)

  13. Nuclear plant engineering work and integrated management system

    International Nuclear Information System (INIS)

    Ohkubo, Y.; Obata, T.; Tanaka, K.

    1992-01-01

    The Application of computers to the design, engineering, manufacturing and construction works of nuclear power plants has greatly contributed to improvement of productivity and reliability in the nuclear power plants constructed by Mitsubishi Nuclear Group for more than ten years. However, in most cases, those systems have been developed separately and utilized independently in different computer software and hardware environments and have not been fully utilized to achieve high efficiency and reliability. In order to drastically increase the productivity and efficiency, development of NUclear power plant engineering Work and INtegrated manaGement System (NUWINGS) started in 1987 to unify and integrate various conventional and developing systems using the state-of-the-art computer technology. The NUWINGS is almost completed and is now applied to actual plant construction. (author)

  14. Nuclear power plant

    International Nuclear Information System (INIS)

    Orlov, V.V.; Rineisky, A.A.

    1975-01-01

    The invention is aimed at designing a nuclear power plant with a heat transfer system which permits an accelerated fuel regeneration maintaining relatively high initial steam values and efficiency of the steam power circuit. In case of a plant with three circuits the secondary cooling circuit includes a steam generator with preheater, evaporator, steam superheater and intermediate steam superheater. At the heat supply side the latter is connected with its inlet to the outlet of the evaporator and with its outlet to the low-temperature side of the secondary circuit

  15. Improvements in the nuclear power plants - a permanent task for the plant management

    International Nuclear Information System (INIS)

    Langetepe, G.

    1991-01-01

    The main motives of the operators of nuclear power plants for carrying out backfitting measures are given by the following objectives: (1) to operate the nuclear power plants, older ones too, at a high level of safety, and to keep a lowest possible difference to the respective level of science and technology, (2) to ensure preconditions for a best possible economical operation, also with changing cost structures, (3) to create preconditions for the longest possible operational time. Operational times of more than 40 years have been throught to be realistic. A constant analysis of the operational safety of the whole plant is necessary for laying down the measures for backfitting of the plant. This analysis must also include the valuation of the nuclear safety in accordance with the progressive level of sience and technology. The proccess of backfitting in the German nuclear power plants will be illustrated with the help of several examples. (orig.) [de

  16. Association of Finnish Members of Parliament and Researchers: Social Democratic Parliamentary group MP K. Olin, Former Finnish MP M. Tiuri, Finnish Centre Party MP P. Vilkuna, Senior Assistant Professor I. Ruostetsaari and Finnish Parliament Committee of Future Researcher U. Gabrielsson at ATLAS experiment with P. Jenn, M. Nordberg and M. Kotamaki on 15 September 2006.

    CERN Document Server

    Maximilien Brice

    2006-01-01

    Association of Finnish Members of Parliament and Researchers: Social Democratic Parliamentary group MP K. Olin, Former Finnish MP M. Tiuri, Finnish Centre Party MP P. Vilkuna, Senior Assistant Professor I. Ruostetsaari and Finnish Parliament Committee of Future Researcher U. Gabrielsson at ATLAS experiment with P. Jenn, M. Nordberg and M. Kotamaki on 15 September 2006.

  17. Report concerning Zarnowiec nuclear power plant

    International Nuclear Information System (INIS)

    Albinowski, S.; Dakowski, M.; Downarowicz, M.

    1990-01-01

    Report of the Team of the President of the National Atomic Energy Agency regarding Zarnowiec nuclear power plant contains the analysis of situation in Poland in June 1990, the assessment of public opinion, as well as the description of ecological, technical and economical problems. The team's conclusions are given together with the general conclusion to stop the construction of Zarnowiec nuclear power plant. 5 appendixes, 6 enclosures, 1 documents list, 1 tab. (A.S.)

  18. Nuclear power plant construction

    International Nuclear Information System (INIS)

    Lima Moreira, Y.M. de.

    1979-01-01

    The legal aspects of nuclear power plant construction in Brazil, derived from governamental political guidelines, are presented. Their evolution, as a consequence of tecnology development is related. (A.L.S.L.) [pt

  19. Optimization of extinguishing agents for nuclear power plants

    International Nuclear Information System (INIS)

    Boleman, M.; Lipar, M.; Balog, K.

    1998-01-01

    Focus is placed on use of extinguishing agents in nuclear power plants. The advantages and disadvantages of these agents are compared. Further perspectives for using particular extinguishing agents in nuclear power plants are outlined. (author)

  20. Nuclear plant data systems - some emerging directions

    International Nuclear Information System (INIS)

    Johnson, R.D.; Humphress, G.B.; McCullough, L.D.; Tashjian, B.M.

    1983-01-01

    Significant changes have occurred in recent years in the nuclear power industry to accentuate the need for data systems to support information flow and decision making. Economic conditions resulting in rapid inflation and larger investments in new and existing plants and the need to plan further ahead are primary factors. Government policies concerning environmental control, as well as minimizing risk to the public through increased nuclear safety regulations on operating plants are additional factors. The impact of computer technology on plant data systems, evolution of corporate and plant infrastructures, future plant data, system designs and benefits, and decision making capabilities and data usage support are discussed. (U.K.)

  1. Nuclear plant-aging research on reactor protection systems

    International Nuclear Information System (INIS)

    Meyer, L.C.

    1988-01-01

    This report presents the rsults of a review of the Reactor Trip System (RTS) and the Engineered Safety Feature Actuating System (ESFAS) operating experiences reported in Licensee Event Reports (LER)s, the Nuclear Power Experience data base, Nuclear Plant Reliability Data System, and plant maintenance records. Our purpose is to evaluate the potential significance of aging, including cycling, trips, and testing as contributors to degradation of the RTS and ESFAS. Tables are presented that show the percentage of events for RTS and ESFAS classified by cause, components, and subcomponents for each of the Nuclear Steam Supply System vendors. A representative Babcock and Wilcox plant was selected for detailed study. The US Nuclear Regulatory Commission's Nuclear Plant Aging Research guidelines were followed in performing the detailed study that identified materials susceptible to aging, stressors, environmental factors, and failure modes for the RTS and ESFAS as generic instrumentation and control systems. Functional indicators of degradation are listed, testing requirements evaluated, and regulatory issues discussed

  2. Application of fieldbus techniques in nuclear power plants

    International Nuclear Information System (INIS)

    Wang Xu; Chen Hang; Yu Shuxin; Zhang Xinli

    2012-01-01

    The successful application experience of fieldbus techniques in thermal power plants and nuclear power plants are outlined first. And then, the application of fieldbus techniques in domestic 3rd-generation nuclear power plant (NPP) project is discussed. After that, the solution to the potential problems of fieldbus techniques application in NPP is provided. (authors)

  3. Tecnatom support to new nuclear power plant projects

    International Nuclear Information System (INIS)

    Manrique, A. B.

    2009-10-01

    Tecnatom is a Spanish engineering company with more than 50 years of experience working for the nuclear industry all over the world. It has worked in over 30 countries in activities related to the operation and maintenance of nuclear power plants. Along this half century of history. Tecnatom has been providing its services to nuclear utilities, regulators, NPP vendors, NPP owners / operators and nuclear fuel manufacturers not only in Spain but also abroad. It started to work in the design of new nuclear power plants in the early 90 s and since then has continued collaborating with different suppliers in the design and licensing of new reactors especially in the areas of plant systems design, man-machine interface design, main control room simulators building, training, qualification of equipment and PSI/ISI engineering services. Some challenges to the reactivation of nuclear power plants construction are common worldwide, including: regulatory processes, workforce availability, construction project management, etc. Being some keys to success the following: apply qualified resources, enough resources for early planning, project leadership, organization and integration, establish a strong integrated management team. The goal of this paper is to inform regarding the capabilities of Tecnatom in the construction of new power plants. (Author)

  4. Pumps in nuclear power plants

    International Nuclear Information System (INIS)

    Kim, J.H.

    1991-01-01

    This paper reports that pumps play an important role in nuclear plant operation. For instance, reactor coolant pumps (RCPs) should provide adequate cooling for reactor core in both normal operation and transient or accident conditions. Pumps such as Low Pressure Safety Injection (LPSI) pump in the Emergency Core Cooling System (ECCS) play a crucial role during an accident, and their reliability is of paramount importance. Some key issues involved with pumps in nuclear plant system include the performance of RCP under two-phase flow conditions, piping vibration due to pump operating in two-phase flows, and reliability of LPSI pumps

  5. Waste from decommissioning of nuclear power plants

    International Nuclear Information System (INIS)

    Nielsen, P.O.

    1992-05-01

    This report is based on the assumption that all twelve nuclear power plants will be shut down no later than A.D. 2010, as was decided by the parliament after the referendum on the future of nuclear power in Sweden. The recent 'Party agreement on the energy policy' of January 15, 1991 does, indeed, leave the door open for an extension of the operational period for the nuclear reactors. This will, however, not change the recommendations and conclusions drawn in this report. The report consists of two parts. Part 1 discusses classification of waste from decommissioning and makes comparisons with the waste arising from reactor operation. Part 2 discusses the documentation required for decommissioning waste. Also this part of the report draws parallels with the documentation required by the authorities for the radioactive waste arising from operation of the nuclear power plants. To some extent these subjects depend on the future use of the nuclear power plant sites after decommissioning of the plants. The options for future site use are briefly discussed in an appendix to the report. There are many similarities between the waste from reactor operations and the waste arising from dismantling and removal of decommissioned nuclear power plants. Hence it seems natural to apply the same criteria and recommendations to decommissioning waste as those presently applicable to reactor waste. This is certainly true also with respect to documentation, and it is strongly recommended that the documentation requirements on decommissioning waste are made identical, or at least similar, to the documentation requirements for reactor waste in force today. (au)

  6. Insurance cost of Swedish nuclear power plants

    International Nuclear Information System (INIS)

    Kaellstrand, Aasa.

    1992-01-01

    What happens if a reactor accident occurs? Can victims of a nuclear accident be compensated for losses? The rights of a victim of a nuclear accident to be compensated for losses are governed by international conventions. These conventions make the licensee of a nuclear plant strictly liable. However, the maximum amount of compensation is limited. In Sweden the total liability of the plant-owner is maximized to 1.2 million Swedish Crowns, that is 0.02 oere/kWh. After the accidents of Harrisburg (1979) and Chernobyl (1986), it has become clear that the amounts of the various conventions are not at all sufficient to cover the damages caused by such an accident. In spite of these facts, there are a large number of reliable sources, who think that the insurance costs are negligible in the cost of production. A cost-benefit analysis based on a study performed by Ottinger et al. in 'Environmental costs of electricity' is therefore adopted to derive the costs of the external effects of nuclear plant operation and from releases to the environment during operation. The environmental externality costs of Swedish nuclear power plant operations are in this report estimated to 18.3 oere/kWh. This figure can be compared to the insurance cost, which for the present is 0.02 oere/kWh. The 'real' insurance cost including the external effects is calculated to approximately 1.12 billion Swedish Crowns] That is 900 times larger than the insurance premium, which the licensee of a nuclear plant faces] (au)

  7. WWER nuclear waste management regulatory experience in Finland

    International Nuclear Information System (INIS)

    Varjoranta, Tero

    2000-01-01

    About 30% of all electricity produced in Finland is generated by nuclear power. Four reactors, with a total capacity of 2 656 MW e (net), are currently in operation. At Loviisa, there are two 488 MW e WWER units (recently upgraded 440-units) and at Olkiluoto two 840 MW e BWR units. At the Loviisa plant conditioning, storage and final disposal of low-and intermediate-level wastes from reactor operation will take place at the NPP sites. Intermediate level ion exchange resins and evaporation concentrates are currently stored in tanks. However, a license application for constructing a solidification plant based on cementation is currently under STUKs regulatory review. The construction of the final repository for I/LLW at the Loviisa site was started in 1993 and the Government granted the operating license in 1998. The nuclear legislation requires disposal of spent fuel into the Finnish bedrock. (Authors)

  8. CAS medium-size nuclear plants

    International Nuclear Information System (INIS)

    Vogelweith, L.; Weiss, A.

    1977-01-01

    CEA has developed a range of pressurized water reactors of the type CAS Compact, which are adapted to civil ship propulsion, or to electric power production, combined possibly with heat production, up to outputs equivalent to 125MW(e). Nuclear plants equipped with these reactors are suitable for medium-size electric networks, especially in developing countries, because they are easily adaptable, owing to their flexibility; they can be installed and used in a variety of ways (on land, floating installation, combination of electric power and other production, etc.); they can be used as training reactors by countries wishing to limit their investment plans before undertaking a wider nuclear development. Examples of two possible realizations are presented: as a floating plant, and as a combined electric and desalting plant. (author)

  9. Geological and geotechnical investigations for nuclear power plants sites

    International Nuclear Information System (INIS)

    Alves, P.R.R.

    1984-09-01

    This dissertation presents a general methodology for the tasks of geological and geotechnical investigations, to be performed in the proposed sites for construction of nuclear Power Plants. In this work, items dealing with the standards applied to licensing of Nuclear Power Plants, with the selection process of sites and identification of geological and geotechnical parameters needed for the regional and local characterization of the area being studied, were incorporated. This dissertation also provides an aid to the writing of Technical Reports, which are part of the documentation an owner of a Nuclear Power Plant needs to submit to the Comissao Nacional de Energia Nuclear, to fulfill the nuclear installation licensing requirements. Moreover, this work can contribute to the planning of field and laboratory studies, needed to determine the parameters of the area under investigation, for the siting of Nuclear Power Plants. (Author) [pt

  10. Construction, Maintenance and Demolition of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Smet, Camiel de [Hilti Corporation, P.O. Box 333, FL-9494 Schaan (Liechtenstein)

    2008-07-01

    Hilti is your reliable partner in nuclear power plant construction, maintenance and demolition worldwide. Professional advice and innovative solutions for virtually every phase of construction and supply technologically leading products and systems to increase your productivity and help to create and maintain safe and lasting plants is offered. The solutions for nuclear power plants construction, maintenance and demolition have been employed with great success in many different countries on a wide variety of projects due in no small way to their worldwide availability. An unbroken, international exchange of experience upholds a permanent innovation process. This assures our customers that they always receive products on the very latest technological standard. This paper is not intended to cover all topics related to nuclear power plants. The idea is more to give a kind of an overview. The paper covers briefly the following topics: safety (corrosion and fire), fastenings, measuring and finally decommissioning of nuclear power plants. (author)

  11. Construction, Maintenance and Demolition of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Smet, Camiel de

    2008-01-01

    Hilti is your reliable partner in nuclear power plant construction, maintenance and demolition worldwide. Professional advice and innovative solutions for virtually every phase of construction and supply technologically leading products and systems to increase your productivity and help to create and maintain safe and lasting plants is offered. The solutions for nuclear power plants construction, maintenance and demolition have been employed with great success in many different countries on a wide variety of projects due in no small way to their worldwide availability. An unbroken, international exchange of experience upholds a permanent innovation process. This assures our customers that they always receive products on the very latest technological standard. This paper is not intended to cover all topics related to nuclear power plants. The idea is more to give a kind of an overview. The paper covers briefly the following topics: safety (corrosion and fire), fastenings, measuring and finally decommissioning of nuclear power plants. (author)

  12. Nuclear plants gain integrated information systems

    International Nuclear Information System (INIS)

    Villavicencio-Ramirez, A.; Rodriquez-Alvarez, J.M.

    1994-01-01

    With the objective of simplifying the complex mesh of computing devices employed within nuclear power plants, modern technology and integration techniques are being used to form centralized (but backed up) databases and distributed processing and display networks. Benefits are immediate as a result of the integration and the use of standards. The use of a unique data acquisition and database subsystem optimizes the high costs of engineering, as this task is done only once for the life span of the system. This also contributes towards a uniform user interface and allows for graceful expansion and maintenance. This article features an integrated information system, Sistema Integral de Informacion de Proceso (SIIP). The development of this system enabled the Laguna Verde Nuclear Power plant to fully use the already existing universe of signals and its related engineering during all plant conditions, namely, start up, normal operation, transient analysis, and emergency operation. Integrated systems offer many advantages over segregated systems, and this experience should benefit similar development efforts in other electric power utilities, not only for nuclear but also for other types of generating plants

  13. Safety goals for commercial nuclear power plants

    International Nuclear Information System (INIS)

    Roe, J.W.

    1988-01-01

    In its official policy statement on safety goals for the operation of nuclear power plants, the Nuclear Regulatory Commission (NRC) set two qualitative goals, supported by two quantitative objectives. These goals are that (1) individual members of the public should be provided a level of protection from the consequences of nuclear power plant operation such that individuals bear no significant additional risk to life and health; and (2) societal risks to life and health from nuclear power plant operation should be comparable to or less than the risks of generating electricity by viable competing technologies and should not be a significant addition to other societal risks. As an alternative, this study proposes four quantitative safety goals for nuclear power plants. It begins with an analysis of the NRC's safety-goal development process, a key portion of which was devoted to delineating criteria for evaluating goal-development methods. Based on this analysis, recommendations for revision of the NRC's basic benchmarks for goal development are proposed. Using the revised criteria, NRC safety goals are evaluated, and the alternative safety goals are proposed. To further support these recommendations, both the NRC's goals and the proposed goals are compared with the results of three major probabilistic risk assessment studies. Finally, the potential impact of these recommendations on nuclear safety is described

  14. On-site tests on the nuclear power plants

    International Nuclear Information System (INIS)

    Morilhat, P.; Favennec, J.M.; Neau, P.; Preudhomme, E.

    1996-01-01

    On-site tests and experiments are performed by EDF Research and Development Division on the nuclear power plants to assess the behaviour of major components submitted to thermal and vibratory solicitations. On-going studies deal with the qualification of new nuclear power plant standard and with the feedback of plants under operation. The tests, particularly the investigation tests, correspond to large investments and entail an important data volume which must ensure the continuity over a long period of the order of magnitude of the in-service plant life (around 40 years). This paper addresses the on-site experimental activities, describes the means to be used, and gives an example: the qualification of SG of new 1450 MW nuclear power plants. (author)

  15. Use of artificial intelligence in nuclear power plants

    International Nuclear Information System (INIS)

    Uhrig, R.E.

    1990-01-01

    The application of artificial intelligence, in the form of expert systems and neural networks, to the control room activities in a nuclear power plant has the potential to reduce operator error and increase plant safety, reliability, and efficiency. Furthermore, there are a large number of non-operating activities (testing, routine maintenance, outage planning, equipment diagnostics, and fuel management) in which artificial intelligence can increase the efficiency and effectiveness of overall plant and corporate operations. This paper reviews the state-of-the-art of artificial intelligence techniques, specifically, expert systems and neural networks, to nuclear power plants. This paper has reviewed the state-of-the-art of artificial intelligence, specifically expert systems and neural networks that are applied to problems in nuclear power plants

  16. Anatomy of a nuclear power plant

    International Nuclear Information System (INIS)

    Navarro, Q.O.

    1983-01-01

    This paper presents the Q model which attempts to classify arguments for use in the discussion on the pros and cons of nuclear power. The basic principles of nuclear energy production, operation of a nuclear power plant and a comparison with other electric power sources are presented and discussed. (ELC)

  17. Operator training simulator for nuclear power plant

    International Nuclear Information System (INIS)

    Shiozuka, Hiromi

    1977-01-01

    In nuclear power plants, training of the operators is important. In Japan, presently there are two training centers, one is BWR operation training center at Okuma-cho, Fukushima Prefecture, and another the nuclear power generation training center in Tsuruga City, Fukui Prefecture, where the operators of PWR nuclear power plants are trained. This report describes the BWR operation training center briefly. Operation of a nuclear power plant is divided into three stages of start-up, steady state operation, and shut down. Start-up is divided into the cold-state start-up after the shut down for prolonged period due to periodical inspection or others and the hot-state start-up from stand-by condition after the shut down for a short time. In the cold-state start-up, the correction of reactivity change and the heating-up control to avoid excessive thermal stress to the primary system components are important. The BWR operation training center offers the next three courses, namely beginner's course, retraining course and specific training course. The training period is 12 weeks and the number of trainees is eight/course in the beginner's course. The simulator was manufactured by modeling No. 3 plant of Fukushima First Nuclear Power Station, Tokyo Electric Power Co. The simulator is composed of the mimic central control panel and the digital computer. The software system comprises the monitor to supervise the whole program execution, the logic model simulating the plant interlock system and the dynamic model simulating the plant physical phenomena. (Wakatsuki, Y.)

  18. Statistical analysis of fuel failures in large break loss-of-coolant accident (LBLOCA) in EPR type nuclear power plant

    International Nuclear Information System (INIS)

    Arkoma, Asko; Hänninen, Markku; Rantamäki, Karin; Kurki, Joona; Hämäläinen, Anitta

    2015-01-01

    Highlights: • The number of failing fuel rods in a LB-LOCA in an EPR is evaluated. • 59 scenarios are simulated with the system code APROS. • 1000 rods per scenario are simulated with the fuel performance code FRAPTRAN-GENFLO. • All the rods in the reactor are simulated in the worst scenario. • Results suggest that the regulations set by the Finnish safety authority are met. - Abstract: In this paper, the number of failing fuel rods in a large break loss-of-coolant accident (LB-LOCA) in EPR-type nuclear power plant is evaluated using statistical methods. For this purpose, a statistical fuel failure analysis procedure has been developed. The developed method utilizes the results of nonparametric statistics, the Wilks’ formula in particular, and is based on the selection and variation of parameters that are important in accident conditions. The accident scenario is simulated with the coupled fuel performance – thermal hydraulics code FRAPTRAN-GENFLO using various parameter values and thermal hydraulic and power history boundary conditions between the simulations. The number of global scenarios is 59 (given by the Wilks’ formula), and 1000 rods are simulated in each scenario. The boundary conditions are obtained from a new statistical version of the system code APROS. As a result, in the worst global scenario, 1.2% of the simulated rods failed, and it can be concluded that the Finnish safety regulations are hereby met (max. 10% of the rods allowed to fail)

  19. Statistical analysis of fuel failures in large break loss-of-coolant accident (LBLOCA) in EPR type nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Arkoma, Asko, E-mail: asko.arkoma@vtt.fi; Hänninen, Markku; Rantamäki, Karin; Kurki, Joona; Hämäläinen, Anitta

    2015-04-15

    Highlights: • The number of failing fuel rods in a LB-LOCA in an EPR is evaluated. • 59 scenarios are simulated with the system code APROS. • 1000 rods per scenario are simulated with the fuel performance code FRAPTRAN-GENFLO. • All the rods in the reactor are simulated in the worst scenario. • Results suggest that the regulations set by the Finnish safety authority are met. - Abstract: In this paper, the number of failing fuel rods in a large break loss-of-coolant accident (LB-LOCA) in EPR-type nuclear power plant is evaluated using statistical methods. For this purpose, a statistical fuel failure analysis procedure has been developed. The developed method utilizes the results of nonparametric statistics, the Wilks’ formula in particular, and is based on the selection and variation of parameters that are important in accident conditions. The accident scenario is simulated with the coupled fuel performance – thermal hydraulics code FRAPTRAN-GENFLO using various parameter values and thermal hydraulic and power history boundary conditions between the simulations. The number of global scenarios is 59 (given by the Wilks’ formula), and 1000 rods are simulated in each scenario. The boundary conditions are obtained from a new statistical version of the system code APROS. As a result, in the worst global scenario, 1.2% of the simulated rods failed, and it can be concluded that the Finnish safety regulations are hereby met (max. 10% of the rods allowed to fail)

  20. Slovak Electric, plc, Mochovce Nuclear Power Plant

    International Nuclear Information System (INIS)

    2000-01-01

    In this popular scientific brochure a brief description of history construction of Bohunice Nuclear Power Plant is presented. The chart of electricity generation in WWER 440/V-213 nuclear power plant is described. Operation and safety improvements at Mochovce NPP as well as environment protection are presented. Basic data of Mochovce NPP are included