WorldWideScience

Sample records for final report contract

  1. Final Report for Contract No. MDA903-85-C-0472

    National Research Council Canada - National Science Library

    Lewman, T

    2002-01-01

    .... Work was performed on site at ARI Presidio of Monterey (ARI-POM). This document, the final report for the contract, describes the results achieved during the contract, and provides a list of the products delivered...

  2. Final Report on the Audit of the Administration of the Contract Closeout Process at the Defense Contract Management Region, Dallas

    Science.gov (United States)

    1990-09-18

    This is our final report on the Audit of the Administration of the Contract Closeout Process at the Defense Contract Management Region, Dallas (DCMR... audit was made from January to October 1989. The objectives of the audit were to determine the timeliness of the contract closeout process, the validity...As part of the audit , we also evaluated internal controls over the contract closeout process. As of December 31, 1988, the Contract Administration

  3. Final Report on the Audit of Architect-Engineer Contracting at the Officer in Charge of Construction, Naval Facilities Engineering Command Contracts, Mediterranean, Madrid, Spain

    Science.gov (United States)

    1990-11-30

    This is our final report on the audit of Architect-Engineer Contracting for the Officer in Charge of Construction, Naval Facilities Engineering...Command Contracts, Mediterranean, for your information and use. This is the fourth in a series of reports issued as part of the audit of architect-engineer...A-E) contracting. The Contract Management Directorate made the audit from August 1989 through July 1990. When we expanded the audit scope to include

  4. Final Technical Report for contract number DE-FG02-05ER15670

    Energy Technology Data Exchange (ETDEWEB)

    Glazebrook, Jane [Univ. of Minnesota, Minneapolis, MN (United States)

    2016-02-29

    This is the final technical report for contract number DE-FG02-05ER15670. The project is now complete, and results of the project have been published. Two papers were published based on work done in the last three-year funding period. The DOIs of these papers are included below. The abstracts of the papers, providing summaries of the work, are included in the body of the report.

  5. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 3, Appendix M, Contract Copies.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This report, is part of the final environmental impact statement of the Bonneville Power Administration, consists of an appendix of contract copies related to the following: Detailed Index to Generic Utility Power Sales Contracts, Text of Generic Utility Contract, Detailed Index to Generic DSI Power Sales Contracts, Text of Generic DSI Contract, Text of Residential Purchase and Sale Agreement (Residential Exchange), and Detailed Index to General Contract Provisions -- GCP Form PSC-2 (Incorporated into all three types of contracts as an Exhibit).

  6. IAEA research contracts. First annual report

    International Nuclear Information System (INIS)

    1961-01-01

    The present volume is the first issue of what will become a regular annual publication by the Agency. It contains summaries of the final reports on all those contracts which have expired before 31 December 1960 with a few exceptions. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No.2, The investigation of electrophysiological responses of biological systems, in particular of nerve cells, to irradiation with small doses of X-ray and other types of ionizing radiation, Research Contract No.3, Investigation on the mode of the protective action of certain sulfhydryl compounds against radiation effects on the synthesis of deoxyribonucleic acid, using tritium-labelled thymidine, Research Contract No.6, Investigation and development of a new method of monitoring and dosimetry for low fluxes of fast neutrons, involving the use of a bubble chamber, Research Contract No.13, Effects of incorporated radioisotopes upon the stability of genetic materials, Research Contract No.16, Interrelationship of root absorption and leaf absorption of radioisotopes in herbaceous plants, Research Contract No. 23, The uptake of radioactive wastes by lowland rice from contaminated soils due to irrigation water and its decontamination, Research Contract No.28, Comparison between mutation rates induced by acute and chronic gamma irradiation

  7. IAEA research contracts. First annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1961-07-01

    The present volume is the first issue of what will become a regular annual publication by the Agency. It contains summaries of the final reports on all those contracts which have expired before 31 December 1960 with a few exceptions. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No.2, The investigation of electrophysiological responses of biological systems, in particular of nerve cells, to irradiation with small doses of X-ray and other types of ionizing radiation, Research Contract No.3, Investigation on the mode of the protective action of certain sulfhydryl compounds against radiation effects on the synthesis of deoxyribonucleic acid, using tritium-labelled thymidine, Research Contract No.6, Investigation and development of a new method of monitoring and dosimetry for low fluxes of fast neutrons, involving the use of a bubble chamber, Research Contract No.13, Effects of incorporated radioisotopes upon the stability of genetic materials, Research Contract No.16, Interrelationship of root absorption and leaf absorption of radioisotopes in herbaceous plants, Research Contract No. 23, The uptake of radioactive wastes by lowland rice from contaminated soils due to irrigation water and its decontamination, Research Contract No.28, Comparison between mutation rates induced by acute and chronic gamma irradiation.

  8. IAEA research contracts. Seventh annual report

    International Nuclear Information System (INIS)

    1967-01-01

    This volume is the seventh annual report and presents full summaries of 52 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1966. Including these, a total of 188 summaries have been published in the various fields in which support is provided under the IAEA Research contract program. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology, food preservation by irradiation

  9. IAEA research contracts. Sixth annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1966-04-01

    This volume is the sixth annual report and presents full summaries of 37 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1965. Including these, a total of 136 summaries have been published in the various fields in which support is provided under the IAEA Research contract program. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology.

  10. IAEA research contracts. Seventh annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1967-05-01

    This volume is the seventh annual report and presents full summaries of 52 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1966. Including these, a total of 188 summaries have been published in the various fields in which support is provided under the IAEA Research contract program. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology, food preservation by irradiation.

  11. IAEA research contracts. Sixth annual report

    International Nuclear Information System (INIS)

    1966-01-01

    This volume is the sixth annual report and presents full summaries of 37 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1965. Including these, a total of 136 summaries have been published in the various fields in which support is provided under the IAEA Research contract program. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology

  12. DELTA-DIESEL ENGINE LIGHT TRUCK APPLICATION Contract DE-FC05-97OR22606 Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Hakim, Nabil Balnaves, Mike

    2003-05-27

    DELTA Diesel Engine Light Truck Application End of Contract Report DE-FC05-97-OR22606 EXECUTIVE SUMMARY This report is the final technical report of the Diesel Engine Light Truck Application (DELTA) program under contract DE-FC05-97-OR22606. During the course of this contract, Detroit Diesel Corporation analyzed, designed, tooled, developed and applied the ''Proof of Concept'' (Generation 0) 4.0L V-6 DELTA engine and designed the successor ''Production Technology Demonstration'' (Generation 1) 4.0L V-6 DELTA engine. The objectives of DELTA Program contract DE-FC05-97-OR22606 were to: Demonstrate production-viable diesel engine technologies, specifically intended for the North American LDT and SUV markets; Demonstrate emissions compliance with significant fuel economy advantages. With a clean sheet design, DDC produced the DELTA engine concept promising the following attributes: 30-50% improved fuel economy; Low cost; Good durability and reliability; Acceptable noise, vibration and harshness (NVH); State-of-the-art features; Even firing, 4 valves per cylinder; High pressure common rail fuel system; Electronically controlled; Turbocharged, intercooled, cooled EGR; Extremely low emissions via CLEAN Combustion{copyright} technology. To demonstrate the engine technology in the SUV market, DDC repowered a 1999 Dodge Durango with the DELTA Generation 0 engine. Fuel economy improvements were approximately 50% better than the gasoline engine replaced in the vehicle.

  13. IAEA research contracts. Fifth annual report

    International Nuclear Information System (INIS)

    1965-01-01

    This volume is the fifth annual report and presents full summaries of 26 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1964. In addition to the summaries describing more general work in 'Health physics and radiation protection', seven reports are included which describe work done under the Agency's first highly-coordinated programme in which various applications of Ca-47 in the fields of medicine and health physics were explored. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine

  14. IAEA research contracts. Fifth annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1965-04-01

    This volume is the fifth annual report and presents full summaries of 26 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1964. In addition to the summaries describing more general work in 'Health physics and radiation protection', seven reports are included which describe work done under the Agency's first highly-coordinated programme in which various applications of Ca-47 in the fields of medicine and health physics were explored. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine.

  15. IAEA research contracts. Ninth annual report

    International Nuclear Information System (INIS)

    1969-01-01

    This volume is the seventh annual publication of the summaries of final reports received during 1968 in connection with contracts and agreements awarded by the IAEA Research Contract Programme. Ninety nine such summaries are included, thus bringing to 323 the total number published so far. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology, food preservation by irradiation

  16. IAEA research contracts. Ninth annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1969-06-01

    This volume is the seventh annual publication of the summaries of final reports received during 1968 in connection with contracts and agreements awarded by the IAEA Research Contract Programme. Ninety nine such summaries are included, thus bringing to 323 the total number published so far. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology, food preservation by irradiation.

  17. Final Report on the Audit of Subcontract Prices on Firm-Fixed-Price Contracts Awarded to McDonnell Aircraft Company

    Science.gov (United States)

    1990-12-03

    This is our final report on the audit of Subcontract Prices on Firm-Fixed-Price Contracts Awarded to McDonnell Aircraft Company (MCAIR). The Contract Management Directorate made the audit from October 1989 through June 1990. The objective of the audit was to compare proposed and negotiated subcontract prices and determine reasons for significant variances. We also evaluated applicable internal control procedures. For a 6-month period ending December 1989, MCAIR issued 517 subcontracts valued at $679 million.

  18. A Theory of Diagnostic Inference: Contract Final Report,

    Science.gov (United States)

    1983-11-01

    and I-bLications ftlated to this Contract ........ 19 1caml.igmnts and Scientific I&VOuMM1.......................... 21 M&i 2 This report esunarizes our... Comunications Sciences Division Naval Training Equipment Center Code 7500 Orlando, FL 32813 Naval Research Laboratory Washington, D. C. 20375 Dr. Gary...Dr. A. L. Slafkosky Scientific Advisor Commander Commandant of the Marine Corps Naval Electronics Systems Co-and C6de RD-1 Human Factors Engineering

  19. FACTORS INFLUENCING THE ACCURACY OF PRE-CONTRACT STAGE ESTIMATION OF FINAL CONTRACT PRICE IN NEW ZEALAND

    Directory of Open Access Journals (Sweden)

    Cong Ji

    2014-12-01

    Full Text Available Establishing and prioritising the factors that may influence the final contract price when responding to a call for tenders is crucial for proper risk analysis and reliable forecasting; it could make or mar the ability to achieve expected profit margin in an era of lump sum fixed price contracts where clients often contest variation claims. In New Zealand, these factors have not been researched; hence estimators rely only on judgement to ‘guess-estimate’ in their price forecasting. This study aimed to fill the knowledge gap by investigating the priority factors. 150 responses from professional members of the New Zealand Institute of Quantity Surveyors were analysed using multi-attribute method. Results showed thirty-seven factors which could influence the final contract price; the three most influential being poor tender documentation, complexity of design & construction, and completeness of project information. Other factors relating to project, client and contractor characteristics, design consultants and tendering conditions, estimating practice and external factors were reported. Concordance analysis indicated high level of agreement amongst survey participants in the rank-ordering of the relative importance of the identified factors. The findings could assist quantity surveyors to prepare more reliable contract price estimates at the pre-contract stage. It would also improve construction-stage cost control.

  20. Engineering and Statistical Research Institute contract reports to May, 1983

    Energy Technology Data Exchange (ETDEWEB)

    Thuns, A; Morrison, B A

    1983-06-01

    The purpose of this publication is to provide information on certain Canadian agricultural research contracts which are completed, published and available for loan. These contracts reports are documentation of research contracted out to non-federal government agencies, universities or individuals. Reports on contracts under the control of the Engineering and Statistical Research Institute are written by the contractor, and are reviewed by the scientific authority. Some reports date back to 1973, when the initial contracting program began. The first program was called DREAM (Development, Research, and Evaluation in Agricultural Mechanization). In 1977-78, projects under the Energy in Agriculture program were added. This was the beginning of the AERD (Agricultural Enginering Research and Development) program. In 1981, energy research had expanded and came under a separate progam called ERDAF (Energy Research and Development in Agriculture and Food). The remaining contract work stayed with the AERD program. This publication lists only contracts completed having final reports, and available contract reports with separate listings sorted by contract file number, title, author or subject.

  1. IAEA research contracts. Third annual report

    International Nuclear Information System (INIS)

    1963-01-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports in the field of Radioactive waste management and environmental research included are: Research Contract No.20. Studies in the uptake of radioisotopes by edible marine products; Research Contract No. 33, Behaviour of fission products in soil; Research Contract No.100, Ionic interaction near clay surfaces. Reports dealing with Health physics and radiation protection presented are: Research Contract No.14, The effect of radiation on plant cells and its modification with protective substances; Research Contract No.32, Determination of the enrichment factors of calcium isotopes on ion exchange resins and the investigation of the various systems of electrolytic separation; Research Contract No. 53, Selection of sulphydryl compounds for radiation protection, using a new microbiological method; Research Contract No. 79, A study of the uptake of radioactive calcium in the skeleton. Reports related to Radiobiology are: Research Contract No.11, Genetical investigations on the effect of ionizing radiation on human cells

  2. IAEA research contracts. Third annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-04-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports in the field of Radioactive waste management and environmental research included are: Research Contract No.20. Studies in the uptake of radioisotopes by edible marine products; Research Contract No. 33, Behaviour of fission products in soil; Research Contract No.100, Ionic interaction near clay surfaces. Reports dealing with Health physics and radiation protection presented are: Research Contract No.14, The effect of radiation on plant cells and its modification with protective substances; Research Contract No.32, Determination of the enrichment factors of calcium isotopes on ion exchange resins and the investigation of the various systems of electrolytic separation; Research Contract No. 53, Selection of sulphydryl compounds for radiation protection, using a new microbiological method; Research Contract No. 79, A study of the uptake of radioactive calcium in the skeleton. Reports related to Radiobiology are: Research Contract No.11, Genetical investigations on the effect of ionizing radiation on human cells

  3. IAEA research contracts. Fourth annual report

    International Nuclear Information System (INIS)

    1964-01-01

    This volume represents the fourth annual report on the results obtained under the Agency's research contract programme. During the short life of this programme, which is not quite six years old, a total investment of more than three million dollars has been made to support research in selected fields at institutes in 50 Member States. Extensive summaries are presented herein for all final reports relating to contracts which were completed during 1963. As it is the policy of the Agency to encourage publication in the open scientific literature of the results of work done under research contracts, a number of papers have also appeared in the appropriate journals - the Agency having been notified of 75 such publications in 1963. A complete list of references to these is given at the end of this report. The scientific data presented in the summaries of course remain the responsibility of the contractor. The Agency, however, is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine

  4. IAEA research contracts. Fourth annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1964-04-01

    This volume represents the fourth annual report on the results obtained under the Agency's research contract programme. During the short life of this programme, which is not quite six years old, a total investment of more than three million dollars has been made to support research in selected fields at institutes in 50 Member States. Extensive summaries are presented herein for all final reports relating to contracts which were completed during 1963. As it is the policy of the Agency to encourage publication in the open scientific literature of the results of work done under research contracts, a number of papers have also appeared in the appropriate journals - the Agency having been notified of 75 such publications in 1963. A complete list of references to these is given at the end of this report. The scientific data presented in the summaries of course remain the responsibility of the contractor. The Agency, however, is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine.

  5. IAEA research contracts. Second annual report

    International Nuclear Information System (INIS)

    1962-01-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No. 1, Factors controlling the distribution of fission products in the biosphere; Research Contract No. 4, The development of a method of non-destructive analysis to determine the U-235 and Pu content of irradiated fuel elements that are in storage under water and that have been out of the reactor for periods of more than one month; Research Contract No. 5, Non-destructive method for evaluating the U-235 and Pu content of irradiated fuel elements; Research Contract No. 19, Studies of contamination in local marine resources, and more specifically the determination of horizontal and vertical diffusion rates in Suruga Bay; Research Contract No. 22, A study of the uptake, accumulation and loss of radioactive material by marine bacteria; Research Contract No. 26, (a) Red cell life span in patients with congenital or acquired haemolytic anaemia using Cr-51 and pie-operative spleen scanning; (b) The aeriology of tropical iron deficiency anaemia using Fe-59 in

  6. IAEA research contracts. Second annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1962-07-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No. 1, Factors controlling the distribution of fission products in the biosphere; Research Contract No. 4, The development of a method of non-destructive analysis to determine the U-235 and Pu content of irradiated fuel elements that are in storage under water and that have been out of the reactor for periods of more than one month; Research Contract No. 5, Non-destructive method for evaluating the U-235 and Pu content of irradiated fuel elements; Research Contract No. 19, Studies of contamination in local marine resources, and more specifically the determination of horizontal and vertical diffusion rates in Suruga Bay; Research Contract No. 22, A study of the uptake, accumulation and loss of radioactive material by marine bacteria; Research Contract No. 26, (a) Red cell life span in patients with congenital or acquired haemolytic anaemia using Cr-51 and pie-operative spleen scanning; (b) The aeriology of tropical iron deficiency anaemia using Fe-59 in

  7. Supplement to final report for ''Theoretical studies in tokamaks''

    International Nuclear Information System (INIS)

    McBride, J.B.

    1992-07-01

    In a previous report we summarized the results obtained for Task I of Contract Number AC03-88ER53270 for the two-year period of performance of the work supported by the contract. That report constituted the final report for Task 1. Since then, the contract was extended and the funding for Task I was incremented with $35K of new funds. The purpose for incrementing the contract was to begin a collaboration with the PBX-M group at Princeton Plasma Physics Laboratory (PPPL) in the area of ion Bernstein wave (IBW) effects in the PBX-M experiment. This report summarizes the initial results of that collaboration obtained under the incremental continuation funding. In the intervening period, experimental and theoretical program directions changed so that no further funds were committed to Task 1

  8. Development of the biosphere code BIOMOD: final report

    International Nuclear Information System (INIS)

    Kane, P.

    1983-05-01

    Final report to DoE on the development of the biosphere code BIOMOD. The work carried out under the contract is itemised. Reference is made to the six documents issued along with the final report. These consist of two technical notes issued as interim consultative documents, a user's guide and a programmer's guide to BIOMOD, a database description, program test document and a technical note entitled ''BIOMOD - preliminary findings''. (author)

  9. Report on the Audit of Architect-Engineer Contracting at U.S. Army Engineer Division, Europe

    Science.gov (United States)

    1991-02-13

    This is our final report on the Audit of Architect-Engineer Contracting at U.S. Army Engineer Division1 Europe, for your information and use...our ongoing audit of architect-engineer contracting. The Contract Management Directorate made the audit from March 1989 through February 1990. The audit covered

  10. Final PHP bench-scale report for the DOE-ID/SAIC sole source contract

    International Nuclear Information System (INIS)

    1997-04-01

    The Plasma Hearth Process (PHP) Technology Development Project was established to develop, test, and evaluate a new concept for treating mixed waste. The new concept uses direct current (dc) transferred-arc plasma torch technology to process mixed waste into a glass-like end-product. Under the cognizance of the US Department of Energy (DOE) Office of Technology Development (OTD) Mixed Waste Focus Area (MWFA), the technology is being explored for its potential to treat mixed waste. Because it is a mature technology, well-understood and commercially available, it is expected to develop rapidly in this new application. This report summarizes the radioactive bench-scale system activities funded under PHP Sole Source Contract DE-AC07-94ID13266 through the end of the contract

  11. Final report on the IAEA research contracts No. 1194/RB, 1194/R1/RB and 1194/R2/RB

    International Nuclear Information System (INIS)

    Zobor, E.; Janosy, J.S.; Szentgali, A.

    1980-09-01

    The final report summarizes the research activities made in the framework of the IAEA Research Contracts No. 1194/RB, 1194/R1/RB and 1194/R2/RB. A multilevel hierarchical control system is treated which uses weakly-coupled low dimensional subsystems under the supervision of a dynamic coordinator program. This self-organizing adaptive control system was checked by a 5 MW research reactor. As an example the paper describes the experimental computer control system of the 5 MW WWR-SM research reactor, where the reactor power and outlet temperature have been controlled on the basis of the treated control concept since 1978. (author)

  12. Study of electron and neutrino interactions. Final report

    International Nuclear Information System (INIS)

    Abashian, A.

    1997-01-01

    This is the final report for the DOE-sponsored experimental particle physics program at Virginia Tech to study the properties of the Standard Model of strong and electroweak interactions. This contract (DE-AS05-80ER10713) covers the period from August 1, 1980 to January 31, 1993. Task B of this contract, headed by Professor Alexander Abashian, is described in this final report. This program has been pursued on many fronts by the researchers in a search for axions at SLAC, in electron-positron collisions in the AMY experiment at the TRISTAN collider in Japan, in measurements of muon decay properties in the MEGA and RHO experiments at the LAMPF accelerator, in a detailed analysis of scattering effects in the purported observation of a 17 keV neutrino at Oxford, in a search for a disoriented chiral condensate with the MiniMax experiment at Fermilab, and in an R ampersand D program on resistive plate counters that could find use in low-cost high-quality charged particle detection at low rates

  13. [Experimental nuclear physics]. Final report

    International Nuclear Information System (INIS)

    1991-04-01

    This is the final report of the Nuclear Physics Laboratory of the University of Washington on work supported in part by US Department of Energy contract DE-AC06-81ER40048. It contains chapters on giant dipole resonances in excited nuclei, nucleus-nucleus reactions, astrophysics, polarization in nuclear reactions, fundamental symmetries and interactions, accelerator mass spectrometry (AMS), ultra-relativistic heavy ions, medium energy reactions, work by external users, instrumentation, accelerators and ion sources, and computer systems. An appendix lists Laboratory personnel, a Ph. D. degree granted in the 1990-1991 academic year, and publications. Refs., 41 figs., 7 tabs

  14. [Experimental nuclear physics]. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-04-01

    This is the final report of the Nuclear Physics Laboratory of the University of Washington on work supported in part by US Department of Energy contract DE-AC06-81ER40048. It contains chapters on giant dipole resonances in excited nuclei, nucleus-nucleus reactions, astrophysics, polarization in nuclear reactions, fundamental symmetries and interactions, accelerator mass spectrometry (AMS), ultra-relativistic heavy ions, medium energy reactions, work by external users, instrumentation, accelerators and ion sources, and computer systems. An appendix lists Laboratory personnel, a Ph. D. degree granted in the 1990-1991 academic year, and publications. Refs., 41 figs., 7 tabs.

  15. Summer 1994 Computational Science Workshop. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    This report documents the work performed by the University of New Mexico Principal Investigators and Research Assistants while hosting the highly successful Summer 1994 Computational Sciences Workshop in Albuquerque on August 6--11, 1994. Included in this report is a final budget for the workshop, along with a summary of the participants` evaluation of the workshop. The workshop proceeding have been delivered under separate cover. In order to assist in the organization of future workshops, we have also included in this report detailed documentation of the pre- and post-workshop activities associated with this contract. Specifically, we have included a section that documents the advertising performed, along with the manner in which applications were handled. A complete list of the workshop participants in this section. Sample letters that were generated while dealing with various commercial entities and departments at the University are also included in a section dealing with workshop logistics. Finally, we have included a section in this report that deals with suggestions for future workshops.

  16. National energy peak leveling program (NEPLP). Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-12-01

    This three-volume report is responsive to the requirements of Contract E (04-3)-1152 to provide a detailed methodology, to include management, technology, and socio-economic aspects, of a voluntary community program of computer-assisted peak load leveling and energy conservation in commercial community facilities. The demonstration project established proof-of-concept in reducing the kW-demand peak by the unofficial goal of 10%, with concurrent kWh savings. This section of the three volume report is a final report appendix with information on the National Energy Peak Leveling Program (NEPLP).

  17. Whither Performance Contracting?

    Science.gov (United States)

    Green, Norman S.

    This report describes briefly performance contracts; discusses their shortcomings, pitfalls, and advantages; and gives some insight into the future development of this new concept. Two shortcomings of performance contracting include (1) teaching to the test and (2) board abdication of its responsibility for making final decisions about educational…

  18. Final Confirmation Sampling and Analysis Report for the POL Yard, Sites SS-06 and ST-40, Wurtsmith AFB, Michigan

    National Research Council Canada - National Science Library

    1999-01-01

    .... Wurtsmith AFBCA and AFCEE/ERT had no comments on the draft final report. This report represents the final contract deliverable for the AFCEE Extended Bioventing Project at the Wurtsmith AFB POL Yard...

  19. SmartInspect: Smart Contract Inspection Technical Report

    OpenAIRE

    Bragagnolo , Santiago; Rocha , Henrique ,; Denker , Marcus; Ducasse , Stéphane

    2017-01-01

    Smart contracts are embedded procedures stored with the data they act upon. Debugging deployed Smart Contracts is a difficult task since once deployed, the code cannot be reexecuted and inspecting a simple attribute is not easily possible because data is encoded. In this technical report, we present SmartInspect to address the lack of inspectability of a deployed contract. Our solution analyses the contract state by using decompilation techniques and a mirror-based architecture to represent t...

  20. Making contracting work better and cost less: Report of the Contract Reform Team

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    In June 1993, Secretary of Energy Hazel O`Leary formed a Contract Reform Team, chaired by Deputy Secretary Bill White, to evaluate the contracting practices of the Department of Energy and to formulate specific proposals for improving those practices. This report summarizes the results of the work of the Contract Reform Team. It recommends actions for implementation that will significantly improve the Department`s contracting practices and will enable the Department to help create a government that -- in the words of Vice President Gore -- {open_quotes}works better and costs less.{close_quotes} These actions and the deadlines for their implementation are listed. Among other things, they recommend replacing the Department`s standard Management and Operating Contract with a new Performance-Based Management Contract and strengthening the Department`s systems for selecting and managing contractors.

  1. Final Report on the Audit of the Administration of the Contract Closeout Process at the Defense Contract Management Region, Dallas

    National Research Council Canada - National Science Library

    1990-01-01

    .... The audit was made from January to October 1989. The objectives of the audit were to determine the timeliness of the contract closeout process, the validity of unliquidated obligations on contracts awaiting closeout, and the timeliness...

  2. Contract Reform Self Assessment Report

    National Research Council Canada - National Science Library

    1997-01-01

    The primary objective of this self assessment is to report on the Department of Energy's progress in implementing the Contract Reform initiative launched in February 1994 and to discuss remaining challenges...

  3. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 2, Appendices A--L.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This report consists of appendices A-L of the final environmental impact statement for the Bonneville Power Administration. The appendices provide information on the following: Ninth circuit Court opinion in Forelaws on Board v. Johnson; guide to Northwest Power act contracts; guide to hydro operations; glossary; affected environment supporting documentation; environmental impacts of generic resource types; information on models used; technical information on analysis; public involvement activities; bibliography; Pacific Northwest Electric Power Planning and Conservation Act; and biological assessment. (CBS)

  4. Professional services contract manager development and certification strategy : spr 696 : final report.

    Science.gov (United States)

    2013-02-27

    SCDOT hires many consultants to provide professional services in support of its planning, design, construction and : maintenance projects. SCDOT personnel responsible for procuring and administering these professional service : contracts, especially ...

  5. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 4, Comments and Responses.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This volume of the Initial Northwest Power Act Power Sales Contracts Final Environmental Impact Statement (Final EIS) contains public comments addressing the Initial Northwest Power Act Power Sales Contracts Draft EIS, August 1990 and Bonneville Power Administration`s (BPA) responses. The Introduction provides information about the process BPA follows in addressing these comments. Part I contains a listing of the Alternative Actions evaluated in the Final EIS; Part II is organized by Alternatives and includes summaries of the comments and BPA responses; Part III provides copies of the original comments letters, and, for ease of identification, are coded in the margins according to the alternative(s) addressed.

  6. Fast waves near the lower hybrid frequency. Final contract report

    International Nuclear Information System (INIS)

    McWilliams, R.

    1984-01-01

    The main function of this contract has been to advance the theory of fast waves near the lower hybrid frequency. Special emphasis was to be given to aspects which would assist experimentalists in planning and performing experiments to test the feasibility of using the fast wave for plasma heating and current drive. Evanescent and propagating conditions for the wave were to be determined. Possible antennas for launching the waves were to be determined. Coupling coefficients of the waves into the plasma were to be found. The results were to be applied to present day and reactor grade plasma parameters

  7. Nuclear-powered satellite studies. Final report, October 1, 1978-March 31, 1980

    International Nuclear Information System (INIS)

    Kaplan, M.H.

    1981-03-01

    Progress achieved during the period October 1, 1978 to March 31, 1980, on US DOE Contract No. DE-AC02-76ET33013.M003 is reported. Discussions of several pertinent aspects are included, e.g., schedule, personnel, and technology developments. The reporting period represents the final 18 months of activities of a project which was designed to provide continuing support in the area of nuclear space power technology. Important results have been obtained and communicated to the scientific community via publications and presentations. Project personnel have participated in point design efforts, a NASA Space Power Committee, and periodically provided support to Department of Energy activities as the need arose. This final report is intended to summarize activities over the life of the project

  8. Can De Sitter spacetime be a final state of the contracting universe

    International Nuclear Information System (INIS)

    Berezin, V.A.

    1984-01-01

    This chapter attempts to phenomenologically describe the final stage of the Universe contraction. A model equation of state is used to demonstrate that during a cosmological contraction a de Sitter spacetime may be produced. It is shown that a equilibrium thermodynamic description of the matter in cosmological models leads to the absence of particle creation. It is proposed that these nonequilibrium processes be taken into account by introducing a new additional thermodynamic variable showing the explicit time dependence of all thermodynamic potentials into the thermodynamic relations. The spacetime is assumed to be homogeneous and isotropic, and the energy momentum tensor includes not only the energy density and pressure for the matter and radiation, but it also includes contributions due to vacuum polarization by correspondent fields. It is demonstrated that it is possible to reach in principle the de Sitter spacetime as the limit of the contraction

  9. Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Schuur, Edward [Northern Arizona Univ., Flagstaff, AZ (United States); Luo, Yiqi [Univ. of Oklahoma, Norman, OK (United States)

    2016-12-01

    This final grant report is a continuation of the final grant report submitted for DE-SC0006982 as the Principle Investigator (Schuur) relocated from the University of Florida to Northern Arizona University. This report summarizes the original project goals, as well as includes new project activities that were completed in the final period of the project.

  10. Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Bohdan W. Oppenheim; Rudolf Marloth

    2007-10-26

    Executive Summary The document contains Final Technical Report on the Industrial Assessment Center Program at Loyola Marymount University in Los Angeles, covering the contract period of 9/1/2002 to 11/30/2006, under the contract DE-FC36-02GO 12073. The Report describes six required program tasks, as follows: TASK 1 is a summary of the assessments performed over the life of the award: 77 assessments were performed, 595 AR were recommended, covering a very broad range of manufacturing plants. TASK 2 is a description of the efforts to promote and increase the adoption of assessment recommendations and employ innovative methods to assist in accomplishing these goals. The LMU IAC has been very successful in accomplishing the program goals, including implemented savings of $5,141,895 in energy, $10,045,411 in productivity and $30,719 in waste, for a total of $15,218,025. This represents 44% of the recommended savings of $34,896,392. TASK 3 is a description of the efforts promoting the IAC Program and enhancing recruitment efforts for new clients and expanded geographic coverage. LMU IAC has been very successful recruiting new clients covering Southern California. Every year, the intended number of clients was recruited. TASK 4 describes the educational opportunities, training, and other related activities for IAC students. A total of 38 students graduated from the program, including 2-3 graduate students every semester, and the remainder undergraduate students, mostly from the Mechanical Engineering Department. The students received formal weekly training in energy (75%) and productivity (25). All students underwent extensive safety training. All students praised the IAC experience very highly. TASK 5 describes the coordination and integration of the Center activities with other Center and IAC Program activities, and DOE programs. LMU IAC worked closely with MIT, and SDSU IAC and SFSU IAC, and enthusiastically supported the SEN activities. TASK 6 describes other tasks

  11. Summary final report: Contract between the Japan atomic power company and the U.S. Department of Energy Improvement of core safety - study on GEM (III)

    International Nuclear Information System (INIS)

    Burke, T.M.; Lucoff, D.M.

    1997-01-01

    This report provides a summary of activities associated with the technical exchange between representatives of the Japan Atomic Power Company (JAPC) and the United States Department of Energy (DOE) regarding the development and testing of Gas Expansion Modules (GEM) at the Fast Flux Test Facility (FFTF). Issuance of this report completes the scope of work defined in the original contract between JAPC and DOE titled ''Study on Improvement of Core Safety - Study on GEM (III).'' Negotiations related to potential modification of the contract are in progress. Under the proposed contract modification, DOE would provide an additional report documenting FFTF pump start tests with GEMs and answer additional JAPC questions related to core safety with and without GEMs

  12. Final Report: Hydrogen Storage System Cost Analysis

    Energy Technology Data Exchange (ETDEWEB)

    James, Brian David [Strategic Analysis Inc., Arlington, VA (United States); Houchins, Cassidy [Strategic Analysis Inc., Arlington, VA (United States); Huya-Kouadio, Jennie Moton [Strategic Analysis Inc., Arlington, VA (United States); DeSantis, Daniel A. [Strategic Analysis Inc., Arlington, VA (United States)

    2016-09-30

    The Fuel Cell Technologies Office (FCTO) has identified hydrogen storage as a key enabling technology for advancing hydrogen and fuel cell power technologies in transportation, stationary, and portable applications. Consequently, FCTO has established targets to chart the progress of developing and demonstrating viable hydrogen storage technologies for transportation and stationary applications. This cost assessment project supports the overall FCTO goals by identifying the current technology system components, performance levels, and manufacturing/assembly techniques most likely to lead to the lowest system storage cost. Furthermore, the project forecasts the cost of these systems at a variety of annual manufacturing rates to allow comparison to the overall 2017 and “Ultimate” DOE cost targets. The cost breakdown of the system components and manufacturing steps can then be used to guide future research and development (R&D) decisions. The project was led by Strategic Analysis Inc. (SA) and aided by Rajesh Ahluwalia and Thanh Hua from Argonne National Laboratory (ANL) and Lin Simpson at the National Renewable Energy Laboratory (NREL). Since SA coordinated the project activities of all three organizations, this report includes a technical description of all project activity. This report represents a summary of contract activities and findings under SA’s five year contract to the US Department of Energy (Award No. DE-EE0005253) and constitutes the “Final Scientific Report” deliverable. Project publications and presentations are listed in the Appendix.

  13. Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Glasser, Alan H. [Fusion Theory and Computation Inc., Kingston, WA (United States)

    2018-02-02

    Final technical report on DE-SC0016106. This is the final technical report for a portion of the multi-institutional CEMM project. This report is centered around 3 publications and a seminar presentation, which have been submitted to E-Link.

  14. Summary final report: Contract between the Japan atomic power company and the U.S. Department of Energy Improvement of core safety - study on GEM (III)

    Energy Technology Data Exchange (ETDEWEB)

    Burke, T.M.; Lucoff, D.M.

    1997-03-18

    This report provides a summary of activities associated with the technical exchange between representatives of the Japan Atomic Power Company (JAPC) and the United States Department of Energy (DOE) regarding the development and testing of Gas Expansion Modules (GEM) at the Fast Flux Test Facility (FFTF). Issuance of this report completes the scope of work defined in the original contract between JAPC and DOE titled ''Study on Improvement of Core Safety - Study on GEM (III).'' Negotiations related to potential modification of the contract are in progress. Under the proposed contract modification, DOE would provide an additional report documenting FFTF pump start tests with GEMs and answer additional JAPC questions related to core safety with and without GEMs.

  15. Quick-Reaction Report on the Audit of the Army Contract with the University of Texas at Austin Institute for Advanced Technology

    Science.gov (United States)

    1992-10-27

    AD-A27O 238 T Of DTIC ELECTE 8OCT 06 1993 E O F F ICE OF THE 1NSPECTOR GENERAL QUICK REAC.7ION REPORT ON THE AUDIT OF THE ARMY CONTRACT WITH THE...ENGINEERING INSPECTOR GENERAL, DEPARTMENT OF TH, ARMY SUBJECT: Quick-Reaction Report on the Audit of the Army Contract with the University of Texas at Austin...comments on Recommendation 3. by November 27, 1992. The courtesies extended to the audit staff are appreciated. If you have any questions on this final

  16. Summary history of domestic uranium procurement under US Atomic Energy Commission contracts. Final report

    International Nuclear Information System (INIS)

    Albrethsen, H. Jr.; McGinley, F.E.

    1982-09-01

    During the period 1947 through 1970, the Atomic Energy Commission (AEC) fostered the rapid development and expansion of the domestic uranium mining and milling industry by providing a market for uranium. Some thirty-two mills were constructed during that period to produce U 3 O 8 concentrates for sale to the AEC. In addition, there were various pilot plants, concentrators, upgraders, heap leach, and solution mining facilities that operated during the period. The purpose of this report is to compile a short narrative history of the AEC's uranium concentrate procurement program and to describe briefly each of the operations that produced uranium for sale to the AEC. Contractual arrangements are described and data are given on quantities of U 3 O 8 purchased and prices paid. Similar data are included for V 2 O 5 , where applicable. Mill and other plant operating data were also compiled from old AEC records. These latter data were provided by the companies, as a contractual requirement, during the period of operation under AEC contracts. Additionally, an effort was made to determine the present status of each facility by reference to other recently published reports. No sites were visited nor were the individual reports reviewed by the companies, many of which no longer exist. The authors relied almost entirely on published information for descriptions of facilities and milling processes utilized

  17. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, C.; Long, S.; Li, Binsheng; Lamke, A.J.

    1994-07-01

    The overall goal of the contract is to provide general support and advice to the DOE, Office of Fossil Energy (DOE/EF) on the opportunities for coal and Clean Coal Technology trade in the Asia-Pacific region. The report which follows is divided into six subsections, each pertaining to separate subtasks the U.S. Department of Energy requested. Subtask A includes two reports, one which outlines important coal and clean coal technology news events which occurred during the second half of 1993, and another which outlines the potential for Clean Coal Technology in the Asia-Pacific Region. Subtask B and the first paper in Subtask C contain advisories and briefing papers that present and explain the coal, electricity and Clean Coal Technology situation in China. The second paper in Subtask C is an overview of the coal supply, demand and trade situation in the Asian region with coal projections to the year 2010. Subtask D is an overview of meetings with Asian energy and policy representatives which were carried out to (1) gather key information relevant to this contract, and (2) examine areas for closer cooperation on important coal/CCT-related energy issues. The tasks listed in the contract proposal as Subtasks E and F are summarized in respective sections of this report. Subtask E specifies the activities carried out under the APEC Experts` Group on Clean Coal Technologies, and Subtask F explains the work done by the Coal Project in building contacts and working relationships with key energy and technology planners in China (including The State Science and Technology Commission, the Ministry of Electric Power and Tsinghua University, and the State Planning Commission). The Subtask E section also includes activities to develop and strengthen the role of the APEC Experts Group on Clean Coal Activities.

  18. Final Close-Out Report for DE-FG02-93ER40764

    Energy Technology Data Exchange (ETDEWEB)

    Gyulassy, Miklos [Columbia Univ., New York, NY (United States)

    2016-02-12

    This is a final close-out report for DOE contract DE-FG02-93ER40764 at Columbia University in New York that funded nuclear theory research at Columbia from 12/15/1992 to 12/14/2015. Highlight of research results from the last FY 2015 period, a list of all 12 PhD students trained through the whole grant, and a list of 201 original papers published from 1993-2015 with impact factor metrics are presented.

  19. DIMEC - Final Report

    DEFF Research Database (Denmark)

    Conrad, Finn

    1997-01-01

    Final report of the research project DIMEC - Danish InfoMechatronic Control supported by the Danish Technical Research Council, STVF.......Final report of the research project DIMEC - Danish InfoMechatronic Control supported by the Danish Technical Research Council, STVF....

  20. Nuclear research with the electromagnetic probe. Final progress report

    Energy Technology Data Exchange (ETDEWEB)

    Meziani, Z.E.

    1994-10-01

    This is the final report on the research carried at Stanford University under contract DE-FG03-88ER40439. All the work accomplished under this grant is reported in the publications listed as part of the Principal Investigator bibliography at the end of this report. In the last few years our research was directed at some of the forefront questions in nuclear physics. We investigated the nuclear medium effects on the intrinsic properties of bound nucleons, specifically the ectromagnetic form factors. For these studies we performed a number of specialized electron scattering experiments with specific sensitivity to nuclear medium effects. At the next level of structure, elementary constituents of matter are quarks and gluons. Defining the energy regime where the quark-gluon description of nuclear systems becomes more relevant than the nucleon-meson description is of great importance in thoroughly understanding the nuclear structure. To explore this transition region, we studied the scaling region in the disintegration of the deuteron, the simplest nuclear system with high energy photons. Finally we focused on the investigation of the nucleon internal spin structure along with the test of the Bjoerken sum rule a fundamental sum rule of QCD.

  1. Nuclear research with the electromagnetic probe. Final progress report

    International Nuclear Information System (INIS)

    Meziani, Z.E.

    1994-10-01

    This is the final report on the research carried at Stanford University under contract DE-FG03-88ER40439. All the work accomplished under this grant is reported in the publications listed as part of the Principal Investigator bibliography at the end of this report. In the last few years our research was directed at some of the forefront questions in nuclear physics. We investigated the nuclear medium effects on the intrinsic properties of bound nucleons, specifically the ectromagnetic form factors. For these studies we performed a number of specialized electron scattering experiments with specific sensitivity to nuclear medium effects. At the next level of structure, elementary constituents of matter are quarks and gluons. Defining the energy regime where the quark-gluon description of nuclear systems becomes more relevant than the nucleon-meson description is of great importance in thoroughly understanding the nuclear structure. To explore this transition region, we studied the scaling region in the disintegration of the deuteron, the simplest nuclear system with high energy photons. Finally we focused on the investigation of the nucleon internal spin structure along with the test of the Bjoerken sum rule a fundamental sum rule of QCD

  2. Management of Contract Waivers and Deviations for Defense Systems

    National Research Council Canada - National Science Library

    1998-01-01

    This report is the fourth and final in a series of reports resulting from our audit of management of contract waivers and deviations for Defense systems and summarizes our overall evaluation. Report...

  3. Final Report

    DEFF Research Database (Denmark)

    Heiselberg, Per; Brohus, Henrik; Nielsen, Peter V.

    This final report for the Hybrid Ventilation Centre at Aalborg University describes the activities and research achievement in the project period from August 2001 to August 2006. The report summarises the work performed and the results achieved with reference to articles and reports published...

  4. Spacecraft fabrication and test MODIL. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Saito, T.T.

    1994-05-01

    This report covers the period from October 1992 through the close of the project. FY 92 closed out with the successful briefing to industry and with many potential and important initiatives in the spacecraft arena. Due to the funding uncertainties, we were directed to proceed as if our funding would be approximately the same as FY 92 ($2M), but not to make any major new commitments. However, the MODIL`s FY 93 funding was reduced to $810K and we were directed to concentrate on the cryocooler area. The cryocooler effort completed its demonstration project. The final meetings with the cryocooler fabricators were very encouraging as we witnessed the enthusiastic reception of technology to help them reduce fabrication uncertainties. Support of the USAF Phillips Laboratory cryocooler program was continued including kick-off meetings for the Prototype Spacecraft Cryocooler (PSC). Under Phillips Laboratory support, Gill Cruz visited British Aerospace and Lucas Aerospace in the United Kingdom to assess their manufacturing capabilities. In the Automated Spacecraft & Assembly Project (ASAP), contracts were pursued for the analysis by four Brilliant Eyes prime contractors to provide a proprietary snap shot of their current status of Integrated Product Development. In the materials and structure thrust the final analysis was completed of the samples made under the contract (``Partial Automation of Matched Metal Net Shape Molding of Continuous Fiber Composites``) to SPARTA. The Precision Technologies thrust funded the Jet Propulsion Laboratory to prepare a plan to develop a Computer Aided Alignment capability to significantly reduce the time for alignment and even possibly provide real time and remote alignment capability of systems in flight.

  5. Independent management and financial review, Yucca Mountain Project, Nevada. Final report, Appendix

    International Nuclear Information System (INIS)

    1995-01-01

    The Nuclear Waste Policy Act of 1982 (Public Law 97-425), as amended by Public Law 100-203, December 22, 1987, established the Office of Civilian Radioactive Waste Management (OCRWM) within the Department of Energy (DOE), and directed the Office to investigate a site at Yucca Mountain, Nevada, to determine if this site is suitable for the construction of a repository for the disposal of high level nuclear waste. Work on site characterization has been under way for several years. Thus far, about $1.47 billion have been spent on Yucca Mountain programs. This work has been funded by Congressional appropriations from a Nuclear Waste Fund to which contributions have been made by electric utility ratepayers through electric utilities generating power from nuclear power stations. The Secretary of Energy and the Governor of the State of Nevada have appointed one person each to a panel to oversee an objective, independent financial and management evaluation of the Yucca Mountain Project. The Requirements for the work will include an analysis of (1) the Yucca Mountain financial and, contract management techniques and controls; (2) Project schedules and credibility of the proposed milestones; (3) Project organizational effectiveness and internal planning processes, and (4) adequacy of funding levels and funding priorities, including the cost of infrastructure and scientific studies. The recipient will provide monthly progress report and the following reports/documents will be presented as deliverables under the contract: (1) Financial and Contract Management Preliminary Report; (2) Project Scheduling Preliminary Report; (3)Project Organizational Effectiveness Preliminary Report; (4) Project Funding Levels and Funding Priorities Preliminary Report; and (5) Final Report

  6. Independent management and financial review, Yucca Mountain Project, Nevada. Final report, Appendix

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-15

    The Nuclear Waste Policy Act of 1982 (Public Law 97-425), as amended by Public Law 100-203, December 22, 1987, established the Office of Civilian Radioactive Waste Management (OCRWM) within the Department of Energy (DOE), and directed the Office to investigate a site at Yucca Mountain, Nevada, to determine if this site is suitable for the construction of a repository for the disposal of high level nuclear waste. Work on site characterization has been under way for several years. Thus far, about $1.47 billion have been spent on Yucca Mountain programs. This work has been funded by Congressional appropriations from a Nuclear Waste Fund to which contributions have been made by electric utility ratepayers through electric utilities generating power from nuclear power stations. The Secretary of Energy and the Governor of the State of Nevada have appointed one person each to a panel to oversee an objective, independent financial and management evaluation of the Yucca Mountain Project. The Requirements for the work will include an analysis of (1) the Yucca Mountain financial and, contract management techniques and controls; (2) Project schedules and credibility of the proposed milestones; (3) Project organizational effectiveness and internal planning processes, and (4) adequacy of funding levels and funding priorities, including the cost of infrastructure and scientific studies. The recipient will provide monthly progress report and the following reports/documents will be presented as deliverables under the contract: (1) Financial and Contract Management Preliminary Report; (2) Project Scheduling Preliminary Report; (3)Project Organizational Effectiveness Preliminary Report; (4) Project Funding Levels and Funding Priorities Preliminary Report; and (5) Final Report.

  7. Radiation chemistry of plastic crystals. Final report

    International Nuclear Information System (INIS)

    Klingen, T.J.

    1979-01-01

    The primary purpose of this report is to summarize the research done under this contract over the past twelve years. Since it is manifestly impossible to provide all the details involved in this work in this report only the primary results of these studies are discussed. The detailed radiolytic mechanisms and kinetics, as well as other detailed information on the systems studied have previously been reported in the annual reports, ORO-3781-1 through 14 and in the journal articles listed in the Contract Publications section of this report. The initial purpose of this work was to study the gamma-ray induced polymerization of organo-substituted carboranes in the solid state. With time this purpose changed to understanding in detail the effects plastic crystallinity had on the overall radiolysis of materials in this type of mesomorphic state. This work included the effects of phase, charge transfer, organic substituent and the ability of the carboranes to act as electron scavengers. For clarity of presentation, the work in the various areas which was performed under this contract is reported in four separate sections: plastic crystallinity, radiation chemistry, electrooptical properties, and thermal oligomerization

  8. 75 FR 29404 - Contract Reporting Requirements of Intrastate Natural Gas Companies

    Science.gov (United States)

    2010-05-26

    ...; Order No. 735] Contract Reporting Requirements of Intrastate Natural Gas Companies May 20, 2010. AGENCY... revises the contract reporting requirements for those natural gas pipelines that fall under the Commission's jurisdiction pursuant to section 311 of the Natural Gas Policy Act or section 1(c) of the Natural...

  9. Foreign uranium supply. Final report

    International Nuclear Information System (INIS)

    McLeod, N.B.; Steyn, J.J.

    1978-04-01

    This report presents an assessment of the extent to which foreign uranium may be available to United States utilities in the short term (through 1980), the intermediate term (1981--1985), and the long term (1986--95). All free world foreign uranium producers and prospects are included, with particular emphasis on Australia, Canada, southern Africa, France, and French-speaking Africa. The assessment includes reserves, resources, exploration and prospects; firm and potential production capacity and prospects; national policies and relevant political and economic conditions; foreign uranium demand; etc. Conclusions are: Foreign supply capability is greater than foreign demand in the near term. The current availability of uncommitted future Australian production presents an unusual opportunity for establishing commercial relations with very substantial producers. Foreign uranium contracts represent an increase in diversity of supply and access to resources but have less assurance of supply than do domestic contracts. However, uncertainties can frequently be accommodated within an overall procurement program, thereby retaining the diversity and price advantages of foreign procurement. The practice of market pricing of contracts reduces the incentives for foreign contracting

  10. High energy physics program at Texas A&M University. Final report, April 1, 1990--March 31, 1991

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-01

    The Texas A&M experimental high energy physics program has been supported since its inception by DOE Contract DE-AS05-81ER40039. During that period we established a viable experimental program at a university which before this time had no program in high energy physics. In 1990, the experimental program was augmented with a program in particle theory. In the accompanying final report, we outline the research work accomplished during the final year of this contract and the program being proposed for consideration by the Department of Energy for future grant support. Some of the particular areas covered are: Collider detector at Fermilab program; the TAMU MACRO program; SSC R&D program; SSC experimental program; and theoretical physics program.

  11. Plan for advanced microelectronics processing technology application. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Goland, A.N.

    1990-10-01

    The ultimate objective of the tasks described in the research agreement was to identify resources primarily, but not exclusively, within New York State that are available for the development of a Center for Advanced Microelectronics Processing (CAMP). Identification of those resources would enable Brookhaven National Laboratory to prepare a program plan for the CAMP. In order to achieve the stated goal, the principal investigators undertook to meet the key personnel in relevant NYS industrial and academic organizations to discuss the potential for economic development that could accompany such a Center and to gauge the extent of participation that could be expected from each interested party. Integrated of these discussions was to be achieved through a workshop convened in the summer of 1990. The culmination of this workshop was to be a report (the final report) outlining a plan for implementing a Center in the state. As events unfolded, it became possible to identify the elements of a major center for x-ray lithography on Lone Island at Brookhaven National Laboratory. The principal investigators were than advised to substitute a working document based upon that concept in place of a report based upon the more general CAMP workshop originally envisioned. Following that suggestion from the New York State Science and Technology Foundation, the principals established a working group consisting of representatives of the Grumman Corporation, Columbia University, the State University of New York at Stony Brook, and Brookhaven National Laboratory. Regular meetings and additional communications between these collaborators have produced a preproposal that constitutes the main body of the final report required by the contract. Other components of this final report include the interim report and a brief description of the activities which followed the establishment of the X-ray Lithography Center working group.

  12. Quarter 9 Mercury information clearinghouse final report

    Energy Technology Data Exchange (ETDEWEB)

    Laudal, D.L.; Miller, S.; Pflughoeft-Hassett, D.; Ralston, N.; Dunham, G.; Weber, G.

    2005-12-15

    The Canadian Electricity Association (CEA) identified a need and contracted the Energy & Environmental Research Center (EERC) to create and maintain an information clearinghouse on global research and development activities related to mercury emissions from coal-fired electric utilities. A total of eight reports were completed and are summarized and updated in this final CEA quarterly report. Selected topics were discussed in detail in each quarterly report. Issues related to mercury from coal-fired utilities include the general areas of measurement, control, policy, and transformations. Specific topics that have been addressed in previous quarterly reports include the following: Quarterly 1 - Sorbent Control Technologies for Mercury Control; Quarterly 2 - Mercury Measurement; Quarterly 3 - Advanced and Developmental Mercury Control Technologies; Quarterly 4 - Prerelease of Mercury from Coal Combustion By-Products; Quarterly 5 - Mercury Fundamentals; Quarterly 6 - Mercury Control Field Demonstrations; Quarterly 7 - Mercury Regulations in the United States: Federal and State; and Quarterly 8 - Commercialization Aspects of Sorbent Injection Technologies in Canada. In this last of nine quarterly reports, an update of these mercury issues is presented that includes a summary of each topic, with recent information pertinent to advances made since the quarterly reports were originally presented. In addition to a comprehensive update of previous mercury-related topics, a review of results from the CEA Mercury Program is provided. 86 refs., 11 figs., 8 tabs.

  13. Addendum to Final Audit Report on Contracting Practices for the Use and Operations of DoD-Sponsored Federally Funded Research and Development Centers

    National Research Council Canada - National Science Library

    1995-01-01

    Inspector General, DoD, Report No. 95-048, "Contracting Practices for the Use and Operations of DoD-Sponsored Federally Funded Research and Development Centers," December 2, 1994, was published without management comments...

  14. Characterization of the radon source in North-Central Florida. Final report part 1 -- Final project report; Final report part 2 -- Technical report

    International Nuclear Information System (INIS)

    1997-01-01

    This report contains two separate parts: Characterization of the Radon Source in North-Central Florida (final report part 1 -- final project report); and Characterization of the Radon Source in North-Central Florida (technical report). The objectives were to characterize the radon 222 source in a region having a demonstrated elevated indoor radon potential and having geology, lithology, and climate that are different from those in other regions of the U.S. where radon is being studied. Radon availability and transport in this region were described. Approaches for predicting the radon potential of lands in this region were developed

  15. Geopressure industrial forums, newsletter and lease support. Final report, April 7, 1981-December 31, 1983

    Energy Technology Data Exchange (ETDEWEB)

    Knutson, C.F.

    1983-12-01

    In the course of this contract C. K. GeoEnergy: (1) planned, organized, conducted, and reported on six DOE/Industry Forum meetings where the progress of DOE's resource development program was outlined and discussed (these six forum meetings included three meetings of the Drilling and Testing Subgroup and three meetings of the Overview Group), (2) prepared and distributed 15 newsletters, and (3) prepared three reports for DOE lease support. This final report includes summaries of each of the forum meetings as well as the three lease support meetings and the newsletter program.

  16. MHD seed recovery and regeneration, Phase II. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    This final report summarizes the work performed by the Space and Technology Division of the TRW Space and Electronics Group for the U.S. Department of Energy, Pittsburgh Energy Technology Center for the Econoseed process. This process involves the economical recovery and regeneration of potassium seed used in the MHD channel. The contract period of performance extended from 1987 through 1994 and was divided into two phases. The Phase II test results are the subject of this Final Report. However, the Phase I test results are presented in summary form in Section 2.3 of this Final Report. The Econoseed process involves the treatment of the potassium sulfate in spent MHD seed with an aqueous calcium formate solution in a continuously stirred reactor system to solubilize, as potassium formate, the potassium content of the seed and to precipitate and recover the sulfate as calcium sulfate. The slurry product from this reaction is centrifuged to separate the calcium sulfate and insoluble seed constituents from the potassium formate solution. The dilute solids-free potassium formate solution is then concentrated in an evaporator. The concentrated potassium formate product is a liquid which can be recycled as a spray into the MHD channel. Calcium formate is the seed regenerant used in the Econoseed process. Since calcium formate is produced in the United States in relatively small quantities, a new route to the continuous production of large quantities of calcium formate needed to support an MHD power industry was investigated. This route involves the reaction of carbon monoxide gas with lime solids in an aqueous medium.

  17. Radioecology of natural systems. Final report, May 1, 1962-October 31, 1979

    International Nuclear Information System (INIS)

    Whicker, F.W.

    1979-01-01

    This is the final report to the US Department of Energy and its predecessors on Contract EY-76-S-02-1156 with Colorado State University. During the first five years of the program, investigations were focused on the accumulation of fallout radionuclides in a well-studied mule deer population in north-central Colorado. In 1967, the scope of the program was enlarged to include studies on radionuclide behavior in mountain lake ecosystems, radiation effects on a shortgrass plains ecosystem, and the combined effects of radiation and intraspecific competition on the pika (Ochotona princeps). In 1971, studies on the geochemistry of lead in an alpine lake and the foraging impact of grasshoppers were added to the diverse program. The summer of 1972 marked the beginning of the research program which was to dominate the effort for the duration of the contract, namely the behavior of plutonium in the terrestrial environs of the Rocky Flats plutonium facility near Denver, Colorado. This report is a general, qualitative summary of activities and major findings over the entire tenure of the program

  18. Research at and Operation of the Materials Science Beamline (X-11) at the National Synchrotron Light Source. Final Report

    International Nuclear Information System (INIS)

    Sayers, Dale E.

    2003-01-01

    This is the final report for DOE DE-FG02-89ER45384. An overview of the operational history and status of beamline X-11A at the end of the contract period, and a brief review of the core science program at NCSU and the scientific results of X-11A since the last progress report is also presented

  19. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    DeTar, Carleton [P.I.

    2012-12-10

    This document constitutes the Final Report for award DE-FC02-06ER41446 as required by the Office of Science. It summarizes accomplishments and provides copies of scientific publications with significant contribution from this award.

  20. Administrative contracts

    OpenAIRE

    Vukićević-Petković Milica

    2015-01-01

    Administrative contracts are a special type of contract where usually one of the contracting parties is a public law body and which is concluded for the performance of public service and the realization of a public interest. They go a long way since its inception to its eventual final acceptance of all the legal systems. One of the enduring characteristics of this type of contract is their disquised or unnoticed existence. This is why only monitoring their development may lead to a complete u...

  1. Ethical aspects of final disposal. Final report

    International Nuclear Information System (INIS)

    Baltes, B.; Leder, W.; Achenbach, G.B.; Spaemann, R.; Gerhardt, V.

    2003-01-01

    In fulfilment of this task the Federal Environmental Ministry has commissioned GRS to summarise the current national and international status of ethical aspects of the final disposal of radioactive wastes as part of the project titled ''Final disposal of radioactive wastes as seen from the viewpoint of ethical objectives''. The questions arising from the opinions, positions and publications presented in the report by GRS were to serve as a basis for an expert discussion or an interdisciplinary discussion forum for all concerned with the ethical aspects of an answerable approach to the final disposal of radioactive wastes. In April 2001 GRS held a one-day seminar at which leading ethicists and philosophers offered statements on the questions referred to above and joined in a discussion with experts on issues of final disposal. This report documents the questions that arose ahead of the workshop, the specialist lectures held there and a summary of the discussion results [de

  2. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Gurney, Kevin R. [Arizona Univ., Mesa, AZ (United States)

    2015-01-12

    This document constitutes the final report under DOE grant DE-FG-08ER64649. The organization of this document is as follows: first, I will review the original scope of the proposed research. Second, I will present the current draft of a paper nearing submission to Nature Climate Change on the initial results of this funded effort. Finally, I will present the last phase of the research under this grant which has supported a Ph.D. student. To that end, I will present the graduate student’s proposed research, a portion of which is completed and reflected in the paper nearing submission. This final work phase will be completed in the next 12 months. This final workphase will likely result in 1-2 additional publications and we consider the results (as exemplified by the current paper) high quality. The continuing results will acknowledge the funding provided by DOE grant DE-FG-08ER64649.

  3. Prototypical Rod Construction Demonstration Project. Phase 3, Final report: Volume 1, Cold checkout test report, Book 3

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 3 discusses the following topics: Downender Test Results and Analysis Report; NFBC Canister Upender Test Results and Analysis Report; Fuel Assembly Handling Fixture Test Results and Analysis Report; and Fuel Canister Upender Test Results and Analysis Report.

  4. New Brunswick Market Design Committee : final report

    International Nuclear Information System (INIS)

    2002-04-01

    This report presents a plan for implementing New Brunswick's electricity restructuring. It includes two resolutions and 95 recommendations to help achieve the main policy objectives of the White Paper, the New Brunswick Energy Policy. The most significant policy goal outlined in the White Paper is the restructuring of the electricity sector, with initial competition being only at the wholesale and large industrial retail level. The Board of Commissioners of Public Utilities will regulate many aspects of the new electricity market. In addition, green pricing options will be made available. The Market Design Committee recommends that the government set up a bilateral contract market for wholesale and large industrial customers to contract with alternate providers for electrical power. Power generators would have the freedom to sell by contract to customers both within and outside the province. The report describes the requirements for establishing a bilateral contract market and how it functions. The Committee also recommends designating a Heritage Pool of electricity available from the existing generation assets in the province. Other recommendations include the creation of programs that will help meet environmental protection goals. The programs include net metering, support of embedded generation, renewable portfolio standards, energy efficiency programs, green pricing, broad-based carbon dioxide emissions trading, emission performance standards, and the promotion of cogeneration. 37 refs., 2 figs

  5. 75 FR 2109 - Notice of Availability of Final Contracting Policy

    Science.gov (United States)

    2010-01-14

    ...-sector companies available to State and local government entities that have a need for the services... will continue to examine ways to improve its contracting processes, including minimizing the turnover frequency of contracting personnel and reducing the length of time required to award contracts and task...

  6. Draft area recommendation report for the Crystalline Repository Project: Comments: Final technical report

    International Nuclear Information System (INIS)

    1986-01-01

    The Mille Lacs Band conducted a review of the draft area recommendation report (ARR) and provided comments as outlined in the contract. It also had staff attending the necessary training and informational meeting established by the Department of Energy. This had met all the necessary objectives as outlined in the contract

  7. Bonneville Purchasing Instructions. Appendix 14A, Contracting Officer`s Technical Representatives` Guide for Services Contracts.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-07-01

    This guide outlines the duties of BPA personnel designated as Contracting Officers Technical Representatives (COTRs). The BPA Administrator gives contracting officers (COs) in BPA responsibility and authority for awarding and administering contracts. COs are authorized to designate other BPA employees to act as their representatives for purposes of contract administration, from the time of contract award until final receipt and acceptance of the contracted services. COTRs are the individuals primarily relied upon to perform technical contract administration functions. Similar functions for supply and construction contracts are performed by engineering representatives, construction inspectors, and inspectors. Although this Guide is written primarily with the COTR in mind, the concept and operation of teamwork is essential throughout the entire process of contract administration. The CO administers the contract during performance, but rarely has expertise in all of the relevant technical areas. Therefore, CO decisions rely on input from a team. The COTR is an indispensable member of that team. The instructions in this Guide are designed to facilitate this essential CO-COTR cooperation. COTR duties are usually additional to those required of the COTR in his or her assigned line organization. The COTR is still accountable to the line supervisor for performance of regularly-assigned duties. These duties are to be reflected appropriately in performance appraisals and job descriptions. For contract administration duties, however, the COTR reports directly to, and is accountable only to, the CO. The COTR`s supervisor must allow sufficient time to ensure that the COTR can adequately monitor the contract for technical compliance. This Guide is designed for COTRs who are performing service contract (including intergovernmental contract) administration functions as an adjunct to their normal technical duties.

  8. 75 FR 80685 - Contract Reporting Requirements of Intrastate Natural Gas Companies

    Science.gov (United States)

    2010-12-23

    ...; Order No. 735-A] Contract Reporting Requirements of Intrastate Natural Gas Companies Issued December 16... Storage Report for Intrastate Natural Gas and Hinshaw Pipelines. Order No. 735-A generally reaffirms the... reporting requirements for (1) intrastate natural gas pipelines \\2\\ providing interstate transportation...

  9. Fusion plasma theory. Task I. Magnetic confinement fusion plasma theory. Final report, October 1, 1984-December 31, 1985

    International Nuclear Information System (INIS)

    Callen, J.D.

    1985-07-01

    The research performed under this contract over the current 15 month period has concentrated on some key Phaedrus tandem mirror plasma confinement and heating issues (ambipolar potential formation due to ICRF, second harmonic ECH, ponderomotive force effects, drift-pumping calculations, moment approach to transport), on development of tokamak neoclassical MHD theory (equations, instabilities, transport), and on some tokamak-specific topics (ballooning modes on a divertor separatrix, equilibrium and resistive evolution codes for Tokapole II). Progress in these and some other miscellaneous areas are briefly summarized in this final progress report for this contract, which is to evolve into a special research grant in the future

  10. Density measurements of H- and D- for fusion applications (final scientific report contract FU-CT-2000-50001)

    Energy Technology Data Exchange (ETDEWEB)

    Boilson, D

    2003-03-01

    The main topic of this contract is the implementation of the Cavity Ring-down Spectroscopy (CRS) technique proposed for quantitative measurement of negative H{sup -} and D{sup -} densities in the Kamaboko III ion source on the MANTIS test bed in the DRFC, CEA Cadarache. MANTIS is used for the development of high density negative ion current beams for use in NBI systems in proposed nuclear fusion reactors. The source used at the MANTIS test stand is a scale version of the source designed for the ITER neutral beam injection system called the Kamaboko III ion source. This report outlines the performance of the KAMABOKO source when operated in caseiated mode. The effect of plasma grid temperature, Cs seeding, Cs consumption, and long pulse, 1000 s, beam extraction are discussed, and the limitations observed with the MANTIS system are identified and further objectives outlined. (author)

  11. Administrative contracts

    Directory of Open Access Journals (Sweden)

    Vukićević-Petković Milica

    2015-01-01

    Full Text Available Administrative contracts are a special type of contract where usually one of the contracting parties is a public law body and which is concluded for the performance of public service and the realization of a public interest. They go a long way since its inception to its eventual final acceptance of all the legal systems. One of the enduring characteristics of this type of contract is their disquised or unnoticed existence. This is why only monitoring their development may lead to a complete understanding of the importance and essence of this institution as well as the need for its complete legal regulation.

  12. Yucca Mountain Project Integrated Data System (IDS). Final report, October 1, 1989--December 31, 1990

    International Nuclear Information System (INIS)

    1991-01-01

    This final report for LANL Subcontract 9-XS8-2604-1 includes copies of all formal letters, memorandums, and reports provided by CAG to support the IDS effort in the LANL Test Managers Office, Las Vegas, Nevada from October 1, 1989 through the end of the contract on December 31, 1990. The material is divided into two sections; the Functional Requirements Document (FRD) and other reports, letters, and memorandums. All documents are arranged in chronological order with most recent last. Numerous draft copies of the FRD were prepared and cover sheets for all drafts are included. The complete text of only the last version supplied (July 27, 1990) is included in this document

  13. 48 CFR 32.605 - Final decisions.

    Science.gov (United States)

    2010-10-01

    ... REQUIREMENTS CONTRACT FINANCING Contract Debts 32.605 Final decisions. (a) The contracting officer shall issue a final decision as required by 33.211 if— (1) The contracting officer and the contractor are unable... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Final decisions. 32.605...

  14. 10 CFR 603.890 - Final performance report.

    Science.gov (United States)

    2010-01-01

    ... to Other Administrative Matters Financial and Programmatic Reporting § 603.890 Final performance report. A TIA must require a final performance report that addresses all major accomplishments under the... 10 Energy 4 2010-01-01 2010-01-01 false Final performance report. 603.890 Section 603.890 Energy...

  15. Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    John Ross

    2003-04-30

    The Final Technical Report summarizes research accomplishments and Publications in the period of 5/1/99 to 4/30/03 done on the grant. Extensive progress was made in the period covered by this report in the areas of chemical kinetics of non-linear systems; spatial structures, reaction - diffusion systems, and thermodynamic and stochastic theory of electrochemical and general systems.

  16. Nearshore transport processes affecting dilution and fate of energy-related contaminants. Final report, 8 August 1977-30 September 1979

    International Nuclear Information System (INIS)

    Blanton, J.O.

    1979-01-01

    This report summarizes the findings and work completed under contract DE-AS09-77SR01025-3. The principal efforts consisted of (1) editing, analysis and plotting of oceanographic data obtained at the Savannah River Navigational Light Tower (SNLT), (2) the synthesis of data from a pilot experiment on transport of trace elements, and (3) the planning of an autumn 1979 experiment. The final report is organized into products that show what was done on these three tasks plus additional smaller tasks specified in Appendix A of the contract. Data are presented from the following specific subject areas: (1) oceanographic and meteorologial data 15 km off the coast of Georgia; (2) oceanographic and meteorological data from Savannah Navigational Light Tower: 9-11 May 1978 Experiment; (3) data report on sea level fluctuations in the South Atlantic Bight; (4) oceanographic and meteorological data 15 km off the coast of Georgia

  17. Contracting for nuclear fuels

    International Nuclear Information System (INIS)

    Schuessler, C.M.

    1981-10-01

    This paper deals with uranium sales contracts, i.e. with contractual arrangements in the first steps of the fuel cycle, which cover uranium production and conversion. The various types of contract are described and, where appropriate, their underlying business philosophy and their main terms and conditions. Finally, the specific common features of such contracts are reviewed. (NEA) [fr

  18. Demonstration, testing, & evaluation of in situ heating of soil. Draft final report, Volume I

    Energy Technology Data Exchange (ETDEWEB)

    Dev, H.; Enk, J.; Jones, D.; Saboto, W.

    1996-02-12

    This document is a draft final report (Volume 1) for US DOE contract entitled, {open_quotes}Demonstration Testing and Evaluation of In Situ Soil Heating,{close_quotes} Contract No. DE-AC05-93OR22160, IITRI Project No. C06787. This report is presented in two volumes. Volume I contains the technical report and Volume II contains appendices with background information and data. In this project approximately 300 cu. yd. of clayey soil containing a low concentration plume of volatile organic chemicals was heated in situ by the application of electrical energy. It was shown that as a result of heating the effective permeability of soil to air flow was increased such that in situ soil vapor extraction could be performed. The initial permeability of soil was so low that the soil gas flow rate was immeasurably small even at high vacuum levels. When scaled up, this process can be used for the environmental clean up and restoration of DOE sites contaminated with VOCs and other organic chemicals boiling up to 120{degrees} to 130{degrees}C in the vadose zone. Although it may applied to many types of soil formations, it is particularly attractive for low permeability clayey soil where conventional in situ venting techniques are limited by low air flow.

  19. 24 CFR 242.52 - Construction contracts.

    Science.gov (United States)

    2010-04-01

    ...; a construction management contract with a guaranteed maximum price, the final costs of which are... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A...

  20. Self-assessment report for fiscal year 1995. Contract 98, Appendix F

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    This report summarizes the FY 1995 self-assessment of the Lawrence Berkeley National Laboratory. The report is divided into administrative and operational support functions as set forth in the University`s contract with the Department of Energy; functional self-assessments; and independent evaluations.

  1. Smart contracts sobre Bitcoin

    OpenAIRE

    Andreu Alemany, Josep Miquel

    2016-01-01

    El present treball final de màster realitza una introducció als smart contracts. El treball introdueix el concepte de contracte intel·ligent, els seus usos i alguns exemples existents. Seguidament proporciona les nocions necessàries de les transaccions del protocol Bitcoin per poder implementar un contracte intel·ligent, usant la blockchain que ofereix el protocol. Per últim, s'explica la implementació d'un contracte intel·ligent usant bitcoin: un canal de micropagaments. El presente traba...

  2. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Stinis, Panos [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-08-07

    This is the final report for the work conducted at the University of Minnesota (during the period 12/01/12-09/18/14) by PI Panos Stinis as part of the "Collaboratory on Mathematics for Mesoscopic Modeling of Materials" (CM4). CM4 is a multi-institution DOE-funded project whose aim is to conduct basic and applied research in the emerging field of mesoscopic modeling of materials.

  3. State-Level Workshops on Ethanol for Transportation: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Graf, A.

    2004-01-01

    Final report on subcontract for holding four state-level workshops (Hawaii, Kentucky, Nevada, California) to facilitate development of ethanol production facilities in those states. In 2002/2003, under contract to the National Renewable Energy Laboratory, BBI International conducted state-level workshops ethanol in Hawaii, Nevada, Kentucky and California. These four workshops followed over 30 other workshops previous held under the Ethanol Workshop Series program sponsored by the U.S. Department of Energy. Two other workshops were conducted by BBI International during 2003, Oklahoma and Kansas, under contract to the Western Regional Biomass Energy Program. The Ethanol Workshop Series (EWS) was intended to provide a forum for interest groups to gather and discuss what needs to be accomplished to facilitate ethanol production in-state using local biomass resources. In addition, the EWS was to provide a promotional and educational forum for policy makers, community leaders, media and potential stakeholders. It was recognized that to eventually achieve biomass-ethanol production, it was necessary to support grain-ethanol production as a bridge. The long-term goal of the Workshops was to facilitate the development of biomass ethanol plants at a state-level. The near-term goal was to provide correct and positive information for education, promotion, production and use of fuel ethanol. The EWS drew from 65 to over 200 attendees and were deemed by the local organizers to have served the objectives set out by the U.S. Department of Energy.

  4. 48 CFR 742.1170-4 - Progress reporting requirements and contract clause.

    Science.gov (United States)

    2010-10-01

    ... progress. (b) Because the cognizant technical officer is the individual most familiar with the contractor's performance, the contractor must submit the progress reports directly to the cognizant technical officer. The cognizant technical officer must review the reports and advise the contracting officer, in writing, of any...

  5. Demonstration, testing, ampersand evaluation of in situ heating of soil. Draft final report, Volume I

    International Nuclear Information System (INIS)

    Dev, H.; Enk, J.; Jones, D.; Saboto, W.

    1996-01-01

    This document is a draft final report (Volume 1) for US DOE contract entitled, open-quotes Demonstration Testing and Evaluation of In Situ Soil Heating,close quotes Contract No. DE-AC05-93OR22160, IITRI Project No. C06787. This report is presented in two volumes. Volume I contains the technical report and Volume II contains appendices with background information and data. In this project approximately 300 cu. yd. of clayey soil containing a low concentration plume of volatile organic chemicals was heated in situ by the application of electrical energy. It was shown that as a result of heating the effective permeability of soil to air flow was increased such that in situ soil vapor extraction could be performed. The initial permeability of soil was so low that the soil gas flow rate was immeasurably small even at high vacuum levels. When scaled up, this process can be used for the environmental clean up and restoration of DOE sites contaminated with VOCs and other organic chemicals boiling up to 120 degrees to 130 degrees C in the vadose zone. Although it may applied to many types of soil formations, it is particularly attractive for low permeability clayey soil where conventional in situ venting techniques are limited by low air flow

  6. Investigations on detonation shock dynamics and related topics. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Stewart, D.S. [Univ. of Illinois, Urbana, IL (United States). Dept. of Theoretical and Applied Mechanics

    1993-11-01

    This document is a final report that summarizes the research findings and research activities supported by the subcontract DOE-LANL-9-XG8-3931P-1 between the University of Illinois (D. S. Stewart Principal Investigator) and the University of California (Los Alamos National Laboratory, M-Division). The main focus of the work has been on investigations of Detonation Shock Dynamics. A second emphasis has been on modeling compaction of energetic materials and deflagration to detonation in those materials. The work has led to a number of extensions of the theory of Detonation Shock Dynamics (DSD) and its application as an engineering design method for high explosive systems. The work also enhanced the hydrocode capabilities of researchers in M-Division by modifications to CAVEAT, an existing Los Alamos hydrocode. Linear stability studies of detonation flows were carried out for the purpose of code verification. This work also broadened the existing theory for detonation. The work in this contract has led to the development of one-phase models for dynamic compaction of porous energetic materials and laid the groundwork for subsequent studies. Some work that modeled the discrete heterogeneous behavior of propellant beds was also performed. The contract supported the efforts of D. S. Stewart and a Postdoctoral student H. I. Lee at the University of Illinois.

  7. Effort - Final technical report on task 3

    DEFF Research Database (Denmark)

    Bay, Niels; Henningsen, Poul; Eriksen, Morten

    The present report is documentation for the work carried out at DTU on the Brite/Euram project No. BE96-3340, contract No. BRPR-CT97-0398, with the title Enhanced Framework for forging design using reliable three-dimensional simulation (EFFORTS). The objective of task 3 is to determine data...

  8. 78 FR 72109 - Quarterly Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Science.gov (United States)

    2013-12-02

    ... continues negotiations on an operations, maintenance and replacement transfer contract with the Navajo... Status Report of Water Service, Repayment, and Other Water-Related Contract Actions AGENCY: Bureau of... individual contract actions may be published in the Federal Register and in newspapers of general circulation...

  9. 78 FR 46365 - Quarterly Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Science.gov (United States)

    2013-07-31

    ..., Colorado, New Mexico, Texas, Utah, and Wyoming: Contracts for extraordinary maintenance and replacement... Status Report of Water Service, Repayment, and Other Water-Related Contract Actions AGENCY: Bureau of... individual contract actions may be published in the Federal Register and in newspapers of general circulation...

  10. 78 FR 72111 - Quarterly Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Science.gov (United States)

    2013-12-02

    ...: Reclamation continues negotiations on an operations, maintenance and replacement transfer contract with the... Status Report of Water Service, Repayment, and Other Water-Related Contract Actions AGENCY: Bureau of... individual contract actions may be published in the Federal Register and in newspapers of general circulation...

  11. Multi-Point Combustion System: Final Report

    Science.gov (United States)

    Goeke, Jerry; Pack, Spencer; Zink, Gregory; Ryon, Jason

    2014-01-01

    A low-NOx emission combustor concept has been developed for NASA's Environmentally Responsible Aircraft (ERA) program to meet N+2 emissions goals for a 70,000 lb thrust engine application. These goals include 75 percent reduction of LTO NOx from CAEP6 standards without increasing CO, UHC, or smoke from that of current state of the art. An additional key factor in this work is to improve lean combustion stability over that of previous work performed on similar technology in the early 2000s. The purpose of this paper is to present the final report for the NASA contract. This work included the design, analysis, and test of a multi-point combustion system. All design work was based on the results of Computational Fluid Dynamics modeling with the end results tested on a medium pressure combustion rig at the UC and a medium pressure combustion rig at GRC. The theories behind the designs, results of analysis, and experimental test data will be discussed in this report. The combustion system consists of five radially staged rows of injectors, where ten small scale injectors are used in place of a single traditional nozzle. Major accomplishments of the current work include the design of a Multipoint Lean Direct Injection (MLDI) array and associated air blast and pilot fuel injectors, which is expected to meet or exceed the goal of a 75 percent reduction in LTO NOx from CAEP6 standards. This design incorporates a reduced number of injectors over previous multipoint designs, simplified and lightweight components, and a very compact combustor section. Additional outcomes of the program are validation that the design of these combustion systems can be aided by the use of Computational Fluid Dynamics to predict and reduce emissions. Furthermore, the staging of fuel through the individually controlled radially staged injector rows successfully demonstrated improved low power operability as well as improvements in emissions over previous multipoint designs. Additional comparison

  12. Decontamination and decommissioning of the EBR-I Complex. Final report

    International Nuclear Information System (INIS)

    Kendall, E.W.; Wang, D.K.

    1975-07-01

    This final report covers the Decontamination and Decommissioning (D and D) of the Experimental Breeder Reactor No. 1 (EBR-I) Complex funded under Contract No. AT(10-1)-1375. The major effort consisted of removal and processing of 5500 gallons of sodium/potassium (NaK) coolant from the EBR-I reactor system. Tests were performed to assess the explosive hazards of NaK and KO 2 in various environments and in contact with various contaminants likely to be encountered in the removal and processing operations. A NaK process plant was designed and constructed and the operation was successfully completed. Lesser effort was required for D and D of the Zero Power Reactor (ZPR-III) Facility, the Argonne Fast Source Reactor (AFSR) Shielding, and removal of contaminated NaK from the storage pit. The D and D effort was completed by 13 June 1975, ahead of schedule. (auth)

  13. HINTS Puerto Rico: Final Report

    Science.gov (United States)

    This final report describes HINTS implementation in Puerto Rico. The report addresses sampling; staffing, training and management of data collection; calling protocol; findings from the CATI Operations, and sample weights.

  14. WMO Marine Final Reports

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Final reports of the World Meteorological Organization (WMO) Commission for Marine Meteorology, Commission for Synoptic Meteorology, and Commission for Basic...

  15. 24 CFR 236.755 - Housing owner's obligation under contract to report tenant income increase.

    Science.gov (United States)

    2010-04-01

    ... FOR RENTAL PROJECTS Rental Assistance Payments § 236.755 Housing owner's obligation under contract to... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Housing owner's obligation under contract to report tenant income increase. 236.755 Section 236.755 Housing and Urban Development...

  16. Report on inspection regarding small business contracting statistics reporting and presentation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    On September 11, 1995, the Office of Inspections, Office of Inspector General (OIG), Department of Energy (DOE), received an allegation regarding the accuracy of the Department`s small business contracting statistics in the Secretary of Energy`s Fiscal Year (FY) 1995 Performance Agreement with the President, entitled: {open_quotes}Performance Agreement Between the President of the United States William Jefferson Clinton and the Secretary of Energy Hazel R. O`Leary.{close_quotes} It was alleged that the FY 1995 Performance Agreement incorrectly communicated that the Department intended to increase small business contracting from 25 percent in FY 1994 to more than 34 percent in FY 1995. We subsequently received additional allegations that the Office of Economic Impact and Diversity (ED) had not issued a required annual report to Congress on the Department`s small business program since 1992 as required by the Department of Energy Act of 1978--Civilian Applications, as amended by Public Law 96-470, and may have provided incorrect information for use in Secretarial presentations on the Department`s small business program.

  17. Natural gas tariffs peak-free with freedom of choice for contracts. Final report of the project 'Balancing with cost-effectiveness with regard to the profile contract

    International Nuclear Information System (INIS)

    2008-12-01

    Market gardeners who approach the profile boundary of 170,000 m 3 gas may face high gas prices in certain situations. LTO Glaskracht Nederland (the Dutch association of entrepreneurs in this sector) examined this problem together with LTO Groeiservice (Organisation for Agriculture and Horticulture Growing). The final report provides recommendations for market gardeners and the organizations LTO Glaskracht Nederland and Productschap Tuinbouw (Commodity Board for Horticulture) [nl

  18. Reduction of construction cost and carbon dioxide emissions by heat contracting. Obstacles and solutions. Final report; Baukostensenkung und CO{sub 2}-Minderung durch Waerme-Contracting. Hemmnisse und Loesungswege. Abschlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Ebert, V.; Liebernickel, T.; Froemel, T.; Kues, H.

    2000-11-01

    The poor condition of many heating systems is caused by a conflict of interest between investors and users. Landlords tended to opt for low investment cost, while the accompanying higher consumption cost was paid by their tenants. The only thing that has changed here is the fact that the 'secondary cost' has become a criterion for new tenants' decision to rent an apartment. Heat contracting may be a way out of the problem as contractors are interested in high-efficiency heating systems and optimally controlled operation. Heat contracting is a service concept of private and communal organisations that involves payment, construction and operation of a heating system by the contractor depending on the contracting model used. [German] Die relativ schlechte und veraltete heizungstechnische Ausruestung der Wohngebaeude in Deutschland ist auf den lange Jahre bestehenden Interessenkonflikt zwischen Investor und Nutzer im Mietwohnungsbau zurueckzufuehren. Durch die Umlagefaehigkeit der Heizkosten auf die Nutzer (Mieter) war der Gebaeudeeigentuemer i.d.R. bestrebt, eine Anlage zu guenstigen Investitionskosten zu erwerben. Die daraus resultierenden, relativ hoeheren Verbrauchskosten waren als Betriebskosten auf die Mieter umlegbar und belasteten den Vermieter nicht. An dieser Situation hat sich bis heute prinzipiell nichts geaendert; allerdings sind die Nebenkosten mit der Hauptkostenposition 'Heizkosten' zu einem Kriterium der Vermietbarkeit geworden, so dass der Vermieter heute die Kosten moeglichst niedrig halten muss. Ein Ausweg aus dem Interessenkonflikt und der neuen Vermietsituation koennte das Waerme-Contracting sein. Seitens des Contractors ist der Einsatz hocheffizienter Anlagentechnik und optimale, d.h. ueberwachte Betriebsbedingungen fuer einen wirtschaftlichen Erfolg unabdingbar. Waerme-Contracting ist ein Dienstleistungskonzept von privatwirtschaftlichen und kommunalen Unternehmen, die - je nach Contracting

  19. Final Report on Pilot Studies / Final Report on Classroom Research with STEM and TESL Assessment

    DEFF Research Database (Denmark)

    Biel, Carmen; Wake, Jo Dugstad; Hesse, Friedrich

    This Deliverable is the final report on pilot studies within the NEXT-TELL project (D6.7) and furthermore comprises the Deliverable on Classroom Research with STEM and TESL Assessment (D2.9) in order to avoid redundancies between those two Deliverables.......This Deliverable is the final report on pilot studies within the NEXT-TELL project (D6.7) and furthermore comprises the Deliverable on Classroom Research with STEM and TESL Assessment (D2.9) in order to avoid redundancies between those two Deliverables....

  20. Final Closeout Report University Research Program in Robotics for Environmental Restoration and Waste Management

    Energy Technology Data Exchange (ETDEWEB)

    James S. Tulenko; Carl Crane

    2004-08-24

    The report covers the 2003-04 contract period, with a retrospective of the 11 years for the contract, from 1993 to 2004. This includes personnel, technical publications and reports, plus research laboratories employed. Specific information is given in eight research areas, reporting on all technology developed and/or deployed by the University of Florida.

  1. Spanish-English Verbatim Translation Exam. Final Report.

    Science.gov (United States)

    Stansfield, Charles W.; And Others

    The development and validation of the Spanish-English Verbatim Translation Exam (SEVTE) is described. The test is for use by the Federal Bureau of Investigation (FBI) in the selection of applicants for the positions of Language Specialist or Contract Linguist. The report is divided into eight sections. Section 1 describes the need for the test,…

  2. U.S. Department of Energy integrated manufacturing & processing predoctoral fellowships. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Petrochenkov, Margaret

    2003-03-31

    The objective of this program was threefold: to create a pool of PhDs trained in the integrated approach to manufacturing and processing, to promote academic interest in the field, and to attract talented professionals to this challenging area of engineering. It was anticipated that the program would result in the creation of new manufacturing methods that would contribute to improved energy efficiency, to better utilization of scarce resources, and to less degradation of the environment. Emphasis in the competition was on integrated systems of manufacturing and the integration of product design with manufacturing processes. Research addressed such related areas as aspects of unit operations, tooling and equipment, intelligent sensors, and manufacturing systems as they related to product design. This is the final report to close out the contract.

  3. Technical progress report, Contracts DE-AC02-81ER40014, 40015 and 40016

    International Nuclear Information System (INIS)

    1981-01-01

    This Progress Report summarizes work carried out at the Nuclear Physics Laboratory of the University of Colorado from November 1, 1980 through July 31, 1981, under contracts between the University of Colorado and the United States Department of Energy. The shorter report period of nine months is due to a change to an earlier submission date this year for our proposal for support to begin February 1, 1982. Cyclotron operation, research, and development have been supported under contract DE-AC02-81ER40014. The AVF cyclotron has continued to provide reliable and versatile beams of protons, deuterons, 3 He and 4 He. A wide variety of research results in direct reactions, nuclear structure, and compound reaction mechanisms can be noted in this Progress Report, correlated in many cases to current problems in intermediate energy physics. Theoretical work on nuclear reactions, carried out under contract DE-AC02-81ER40015, has been well matched to our experimental programs in low and intermediate energy physics. One important result has been the recasting of the DWBA in an eikonal expansion suited to high energy reactions. Our efforts in intermediate energy physics, under contract DE-AC02-81ER40016, have emphasized pion scattering studies at LAMPF and TRIUMF and proton induced charge exchange reactions at IUCF. Data for an important test of hadronic charge symmetry have been completed at two energies, using elastic pion-deuteron scattering

  4. The contract - introduction

    International Nuclear Information System (INIS)

    Loeffler, G.

    1975-01-01

    The contract is the last and final step of project planning and the first step of project implementation. The contract has to specify in detail and to the point, as concisely as possible, the complete scope of supplies and work, define all technical particulars and requirements, put forward the conditions of legal, regulatory, administrative and financial procedure, prepare for operating and maintenance instructions to be issued after commissioning. In short, the contract is expected to be a reliable instrument during the manufacturing and construction period as well as a guide-book to assist the owner afterwards in the operation and maintenance of the plant. (orig./FW) [de

  5. GPHS-RTGs in support of the Cassini RTG Program. Addendum to the final technical report, May 1--December 31, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    This Addendum to the Cassini GPHS-RTG Program Final Technical Progress Report describes activities performed during the period 1 May 1998 through 31 December 1998, including effort reflecting contract modification M058. These activities include Earth Gravity Assist (EGA) reentry and related analyses which are detailed in Part A, and effort related to the installation of CAGO equipment within Lockheed Martin`s Building 100 facility in Valley Forge, PA, which is detailed in Part B.

  6. GPHS-RTGs in support of the Cassini RTG Program. Addendum to the final technical report, May 1-December 31, 1998

    International Nuclear Information System (INIS)

    1998-12-01

    This Addendum to the Cassini GPHS-RTG Program Final Technical Progress Report describes activities performed during the period 1 May 1998 through 31 December 1998, including effort reflecting contract modification M058. These activities include Earth Gravity Assist (EGA) reentry and related analyses which are detailed in Part A, and effort related to the installation of CAGO equipment within Lockheed Martin's Building 100 facility in Valley Forge, PA, which is detailed in Part B

  7. Report on the final BRACElet workshop

    Directory of Open Access Journals (Sweden)

    Tony Clear

    Full Text Available This paper reports on the thirteenth and final BRACElet workshop. In this paper we provide a brief retrospective review of the workshops and the findings that have resulted from this multi-institutional multinational investigation into the teaching and learning of novice programmers. Subsequently we report on the work undertaken during the final workshop and then discuss future avenues for research that have evolved as a result of the BRACElet project.

  8. Hydrological flow analysis at Yucca Mountain, Nevada. Final report

    International Nuclear Information System (INIS)

    1995-01-01

    This final report, prepared by Hydro Geo Chem staff for Los Alamos National Laboratory, summarizes work conducted by the company under Subcontract 52OHHOOI 5-3G, which was terminated by LANL effective 7 February 1995 for practical reasons, in that responsibilities for all tasks in the Statement of Work had been transitioned to LANL employees. The ultimate objective of this work is to characterize the movement of subsurface water in the vicinity of Yucca Mountain, Nevada. Data produced under this contract is to be used by the U.S. Department of Energy in its Yucca Mountain Site Characterization Project (YMP) to help determine hydrologic flows that may affect the performance of a potential nuclear waste,, repository. The data may be used in the licensing proceedings, and certain quality assurance procedures have thus been required. The work has focused on measuring the distribution of environmental tracers- chlorine-36, chlorine, and bromine-and on evaluating the depth to which these conservative solutes have percolated in the unsaturated zone at Yucca Mountain. The period of performance for the original Subcontract was I October 1994 to 31 December 1996. Obviously, we have not completed, nor are we expected to complete, all of the scope of work in the Subcontract. The following discussion summarizes progress made on the tasks outlined in the Statement of Work for this Subcontract Details of this work and all data acquired by Hydro Geo Chem for this Subcontract have, been systematically organized in logbooks and - laboratory notebooks (Appendices A and B). These documents have been structured to make it easy to trace the analytical history of a sample, from time of receipt to the final analytical results. The current status of this work and its relevance for the Yucca Mountain Project are described in a LANL report co-authored by Hydro Geo Chem staff

  9. DOD Electronic Commerce (EC)/Electronic Data Interchange (EDI) in contracting report

    Science.gov (United States)

    1993-12-01

    Use of Electronic Commerce (EC)/Electronic Data Interchange (EDI) to support Department of Defense (DoD) procurement processes has been under consideration for some time. A 1988 Deputy Secretary of Defense memo calls for maximum use of EDI, based on 10 years of DoD EDI investigation and experiments. In 1990, Defense Management Review Decision 941 stated, 'The strategic goal of DoD's current efforts is to provide the department with the capability to initiate, conduct, and maintain its external business related transactions and internal logistics, contracting, and financial activities without requiring the use of hard copy media.' The EC in Contracting PAT membership reflected a broad cross section of Military Services and Defense Agencies working on a full-time basis for 60 days. The diversity of the EC in Contracting PAT ensured that the needs and concerns of all DoD components were addressed during the creation of the report. The resultant plan, therefore, represents a comprehensive approach for implementing EC throughout the DoD.

  10. Microscopic heavy-ion theory. Final technical report, June 1, 1993 - May 31, 1996

    International Nuclear Information System (INIS)

    Ernst, D.J.; Oberacker, V.E.; Umar, A.S.

    1998-01-01

    In this Final Technical Report, the authors summarize the research activities of the three Principal Investigators (Professors Ernst, Oberacker, and Umar) at Vanderbilt University since the last reporting period through the subject award expiration date (Dec. 31, 1996) under contract DE-FG05-87ER40376 with the Department of Energy. The research effort is divided between the following three areas: nuclear structure and astrophysics (microscopic nuclear structure studies and properties of exotic nuclei at HRIBF, supernovae calculations in connection with nuclear astrophysics, and nuclear viscosity studies via muon-induced fission at PSI); pion and kaon interactions with the nucleus at high energies (interaction of pions and kaons with nuclei from low energies to 1 GeV, propagation of excited hadrons in the nuclear medium as probed by pion and electron induced reactions); nuclear physics at high energies (dynamical string-parton model to study multi-particle production at RHIC, electromagnetic lepton pair production at RHIC)

  11. Self-sealing barriers of sand/bentonite-mixtures in a clay repository. SB-experiment in the Mont Terri Rock Laboratory. Final report

    International Nuclear Information System (INIS)

    Rothfuchs, Tilmann; Czaikowski, Oliver; Hartwig, Lothar; Hellwald, Karsten; Komischke, Michael; Miehe, Ruediger; Zhang, Chun-Liang

    2012-10-01

    Several years ago, GRS performed laboratory investigations on the suitability of clay/mineral mixtures as optimized sealing materials in underground repositories for radioactive wastes /JOC 00/ /MIE 03/. The investigations yielded promising results so that plans were developed for testing the sealing properties of those materials under representative in-situ conditions in the Mont Terri Rock Laboratory (MTRL). The project was proposed to the ''Projekttraeger Wassertechnologie und Entsorgung (PtWT+E)'', and finally launched in January 2003 under the name SB-project (''Self-sealing Barriers of Clay/Mineral Mixtures in a Clay Repository''). The project was divided in two parts, a pre-project running from January 2003 until June 2004 under contract No. 02E9713 /ROT 04/ and the main project running from January 2004 until June 2012 under contract No. 02E9894 with originally PtWT+E, later renamed as PTKA-WTE. In the course of the pre-project it was decided to incorporate the SB main project as a cost shared action of PtWT+E and the European Commission (contract No. FI6W-CT-2004-508851) into the EC Integrated Project ESDRED (Engineering Studies and Demonstrations of Repository Designs) performed by 11 European project partners within the 6th European framework programme. The ESDRED project was terminated prior to the termination of the SB project. Interim results were reported by mid 2009 in two ESDRED reports /DEB09/ /SEI 09/. This report presents the results achieved in the whole SB-project comprising preceding laboratory investigations for the final selection of suited material mixtures, the conduction of mock-up tests in the geotechnical laboratory of GRS in Braunschweig and the execution of in-situ experiments at the MTRL.

  12. Efforts - Final technical report on task 4. Physical modelling calidation

    DEFF Research Database (Denmark)

    Andreasen, Jan Lasson; Olsson, David Dam; Christensen, T. W.

    The present report is documentation for the work carried out in Task 4 at DTU Physical modelling-validation on the Brite/Euram project No. BE96-3340, contract No. BRPR-CT97-0398, with the title Enhanced Framework for forging design using reliable three-dimensional simulation (EFFORTS). The report...

  13. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Webb, Robert C. [Texas A& M University; Kamon, Teruki [Texas A& M University; Toback, David [Texas A& M University; Safonov, Alexei [Texas A& M University; Dutta, Bhaskar [Texas A& M University; Dimitri, Nanopoulos [Texas A& M University; Pope, Christopher [Texas A& M University; White, James [Texas A& M University

    2013-11-18

    Overview The High Energy Physics Group at Texas A&M University is submitting this final report for our grant number DE-FG02-95ER40917. This grant has supported our wide range of research activities for over a decade. The reports contained here summarize the latest work done by our research team. Task A (Collider Physics Program): CMS & CDF Profs. T. Kamon, A. Safonov, and D. Toback co-lead the Texas A&M (TAMU) collider program focusing on CDF and CMS experiments. Task D: Particle Physics Theory Our particle physics theory task is the combined effort of Profs. B. Dutta, D. Nanopoulos, and C. Pope. Task E (Underground Physics): LUX & NEXT Profs. R. Webb and J. White(deceased) lead the Xenon-based underground research program consisting of two main thrusts: the first, participation in the LUX two-phase xenon dark matter search experiment and the second, detector R&D primarily aimed at developing future detectors for underground physics (e.g. NEXT and LZ).

  14. Local atomic and electronic structure in glassy metallic alloys. Final report, March 1, 1979-May 31, 1982

    International Nuclear Information System (INIS)

    Messmer, R.P.; Wong, J.

    1982-01-01

    The research results reported, represent the first coordinated experimental-theoretical effort to arrive at important local atomic and electronic structure information in glassy alloys. During the three years covered by the contract, significant experimental and theoretical developments have taken place both in the general technical community and at General Electric which have had an important impact on the approach to this problem. This is particularly true in the theoretical area where two important advances, the development of a general Xα-LCAO approach, and the development of a general and accurate effective potential approach for density functional methods, have allowed us to construct a new computational capability which combines these two advances. Two subsections briefly review the experimental and theoretical technical developments, respectively. These developments have changed initial perspectives regarding research on local atomic and electronic structure in glassy metallic alloys. Section II presents a synopsis of our accomplishments during the contract period and Section III contains a more detailed discussion of some of these accomplishments, namely those portions of the work which have been published or submitted for publication at the time of writing this final report

  15. Compatibility of manufacturing process fluids with HFC refrigerants and ester lubricants. First draft of final report of part one and quarterly report of part two, January 3, 1994--November 30, 1994

    Energy Technology Data Exchange (ETDEWEB)

    Cavestri, R.C. [Imagination Resources, Inc., Dublin, OH (United States)

    1994-11-01

    Included in this report is a compiled partial list of presently used processing materials in the air-conditioning and refrigeration industry and the manufacturers, intended uses, and applications of each. Also listed are the processing materials that have received final acceptance for this contracted study. An analytical methodology discussion is presented, including the final decision and the limitations of said methodology, as well as how to establish a level of confidence in observed immiscible material components in two 32 ISO VG polyolesters: (1) Mobil EAL Arctic 32; and (2) ICI Emkarate RL32H; both with HFC 134a refrigerant solutions.

  16. SP-100 coated-particle fuel development. Phase I. Final report

    International Nuclear Information System (INIS)

    1983-03-01

    This document is the final report of Phase I of the SP-100 Coated-Particle Fuel Development Program conducted by GA Technologies Inc. for the US Department of Energy under contract DE-AT03-82SF11690. The general objective of the study conducted between September and December 1982 was to evaluate coated-particle type fuel as an alternate or backup fuel to the UO 2 tile-and-fin arrangement currently incorporated into the reference design of the SP-100 reactor core. This report presents and discusses the following topics in the order listed: the need for an alternative fuel for the SP-100 nuclear reactor; an abbreviated description of the reference and coated-particle fuel module concepts; the bases and results of the study and analysis leading to the preliminary design of a coated particle suitable for the SP-100 space power reactor; incorporation of the fuel particles into compacts and heat-pipe-cooled modules; initial efforts and plans to fabricate coated-particle fuel and fuel compacts; the design and performance of the proposed alternative core relative that of the reference fuel; and a summary of critical issues and conclusions consistent with the level of effort and duration of the study

  17. Establishing contract periods

    International Nuclear Information System (INIS)

    Huffman, F.C.

    1978-01-01

    The lead time for executing the Adjustable Fixed-Commitment (AFC) contract and exceptions which may be considered are discussed. The initial delivery period is also discussed. Delays, deferrals, and schedule adjustment charges are finally considered

  18. Camp Verde Adult Reading Program. Final Performance Report.

    Science.gov (United States)

    Maynard, David A.

    This document begins with a four-page performance report describing how the Camp Verde Adult Reading Program site was relocated to the Community Center Complex, and the Town Council contracted directly with the Friends of the Camp Verde Library to provide for the requirements of the program. The U.S. Department of Education grant allowed the…

  19. Conference Reports: New developments affecting natural gas sales contracts

    International Nuclear Information System (INIS)

    1999-01-01

    Papers presented at a conference examining and reviewing recent trends in natural gas sales contracts are contained in this volume. Conference participants heard 14 presentations, with topics including pricing provisions in gas contracts, security of supply, cross-border issues, legislative reform of electronic data interchange, digital signatures, new developments in managing contracts in a competitive environment, the changing role of natural gas aggregators, drafting 'force majeure' clauses in natural gas purchase/sale contracts and the consequences and remedies for breach of natural gas contracts. The volume also includes biographical notes, and current addresses of the speakers

  20. 16 CFR 700.8 - Warrantor's decision as final.

    Science.gov (United States)

    2010-01-01

    ... jurisdiction over suits for breach of warranty and service contract. ... decision as final. A warrantor shall not indicate in any written warranty or service contract either... party is final or binding in any dispute concerning the warranty or service contract. Nor shall a...

  1. Geopressured-geothermal aquifers. Final contract report

    Energy Technology Data Exchange (ETDEWEB)

    1983-08-01

    Task 1 is to provide petrophysical and reservoir analysis of wells drilled into geopressured-geothermal aquifers containing dissolved methane. The list of Design Wells and Wells of Opportunity analyzed: Fairfax Foster Sutter No. 2 (WOO), Pleasant Bayou No. 2 (Design), Amoco Fee No. 1 (Design), G.M. Koelemay No. 1 (WOO), Gladys McCall No. 1 (Design), P.R. Girouard No. 1 (WOO), and Crown Zellerbach No. 2 (WOO). Petrophysical and reservoir analysis of the above wells were performed based on availability of data. The analysis performed on each well, the assumptions made during simulation, and conclusions reached.

  2. Demonstration, testing, & evaluation of in situ heating of soil. Draft final report, Volume II: Appendices A to E

    Energy Technology Data Exchange (ETDEWEB)

    Dev, H.; Enk, J.; Jones, D.; Saboto, W.

    1996-02-12

    This document is a draft final report for US DOE contract entitled, {open_quotes}Demonstration Testing and Evaluation of In Situ Soil Heating,{close_quotes} Contract No. DE-AC05-93OR22160, IITRI Project No. C06787. This report is presented in two volumes. Volume I contains the technical report This document is Volume II, containing appendices with background information and data. In this project approximately 300 cu. yd. of clayey soil containing a low concentration plume of volatile organic chemicals was heated in situ by the application of electrical energy. It was shown that as a result of heating the effective permeability of soil to air flow was increased such that in situ soil vapor extraction could be performed. The initial permeability of soil was so low that the soil gas flow rate was immeasurably small even at high vacuum levels. When scaled up, this process can be used for the environmental clean up and restoration of DOE sites contaminated with VOCs and other organic chemicals boiling up to 120{degrees}to 130{degrees}C in the vadose zone. Although it may applied to many types of soil formations, it is particularly attractive for low permeability clayey soil where conventional in situ venting techniques are limited by low air flow.

  3. 76 FR 73564 - Federal Acquisition Regulation; Updates to Contract Reporting and Central Contractor Registration

    Science.gov (United States)

    2011-11-29

    ... Federal Acquisition Regulation; Updates to Contract Reporting and Central Contractor Registration AGENCIES... Procurement Data System (FPDS). Additionally, changes are proposed for the clauses requiring contractor registration in the Central Contractor Registration (CCR) database and DUNS number reporting. DATES: Interested...

  4. Post contract / Project management in Nuclear Malaysia

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim

    2010-01-01

    Full-text: Post contract is a period from issuance certificate of practical completion until final statement of account of the project. If this procedure not completed the whole project will at large, create customers un-satisfaction, contractual obligation not complied, record not completed and financial setback. With the usage terms of contract, standard JKR circulars, treasury circulars and JKR quality manual BKJ will produce new Standard operating procedure, SOP with regards to these matters. In doing so it shall increase customer satisfaction and reduce time to finalise project and provide good record system. Keywords: Post contract, certificate of practical completion, final account, customer satisfaction, Standard operating procedure. (author)

  5. 76 FR 43892 - Modifications of Certain Derivative Contracts

    Science.gov (United States)

    2011-07-22

    ... obligations under the derivative contract and the party to which the rights and obligations are transferred or... assigning its rights and obligations under the contract and the party to which the rights and obligations... Modifications of Certain Derivative Contracts AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Final...

  6. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Jarillo-Herrero, Pablo [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States)

    2017-02-07

    This is the final report of our research program on electronic transport experiments on Topological Insulator (TI) devices, funded by the DOE Office of Basic Energy Sciences. TI-based electronic devices are attractive as platforms for spintronic applications, and for detection of emergent properties such as Majorana excitations , electron-hole condensates , and the topological magneto-electric effect . Most theoretical proposals envision geometries consisting of a planar TI device integrated with materials of distinctly different physical phases (such as ferromagnets and superconductors). Experimental realization of physics tied to the surface states is a challenge due to the ubiquitous presence of bulk carriers in most TI compounds as well as degradation during device fabrication.

  7. Guidelines for Preparing Final Technical Reports

    International Development Research Centre (IDRC) Digital Library (Canada)

    fdieudonne

    Prior to submitting the Final Technical Report, any outstanding issues related to dissemination in accordance with ... The report should be an opportunity to reflect on the management of the project from various perspectives: .... of poor quality.

  8. Advanced power conversion based on the Aerocapacitor{trademark}. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Roark, D.

    1997-03-05

    This report summarizes work performed under contract No. DE-FC07-94ID13283, {open_quotes}Advanced Power Conversion Based on the Aerocapacitors{trademark}.{close_quotes} Under this contract high power density, high energy density, organic electrolyte Aerocapacitors{trademark} were developed and characterized for power conversion applications. Pilot facilities for manufacturing prototype AA-size Aerocapacitors{trademark} were put in place. The low ESR and good frequency response of these devices show that they are ideal components for high discharge rate and low to moderate frequency (< 10 kHz) applications such as power conversion.

  9. Effects of long-term coal supply contracts on technology adoption and improvements in the mining of coal. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    Walton, D.R.; Hawkins, S.A.; Webb, P.F.; Kauffman, P.W.

    1979-08-01

    The relationship between long-term coal supply contracts and the adoption of new technology in the coal mining industry is a complex one. From this study certain conclusions can be drawn. New technologies and improvements in the mining of coal can be logically categorized into three areas: evolutionary technology, transitional technology, or innovative technology. Evolutionary improvements in technology can be categorized as improvements, or increased production capacities, in existing equipment. Transitional technology involves the adoption of existing or proven technologies into new conditions, or, proceeding from one technology type to a newer type for the same function. Innovative technology includes equipment, concepts, and systems not readily available, or untried, in the existing mining environment (seam conditions, etc.). Technology adoption is an economic decision. This point was repeatedly emphasized by industry representatives contacted during the study. The long-term coal supply contract influences the decision to adopt new technology and mining improvements in several ways depending on the technology type (i.e., evolutionary, transitional, or innovative), and also the coal supplier type (i.e., captive or independent producer). Several examples of the adoption of new technologies in mines under long-term coal supply contracts are discussed. (LTN)

  10. 22 CFR 72.5 - Final report of death.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Final report of death. 72.5 Section 72.5... DEATHS AND ESTATES Reporting Deaths of United States Nationals § 72.5 Final report of death. (a) Preparation. Except in the case of the death of an active duty member of the United States Armed Forces, when...

  11. Final Technical Close out Report University Research Program in Robotics for Environmental Restoration and Waste Management

    International Nuclear Information System (INIS)

    James S. Tulenko; Carl Crane

    2004-01-01

    The report covers the 2003-04 contract period, with a retrospective of the 11 years for the contract, from 1993 to 2004. This includes personnel, technical publications and reports, plus research laboratories employed. Specific information is given in eight research areas, reporting on all technology developed and/or deployed by the University of Florida

  12. National energy peak leveling program (NEPLP). Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-12-01

    This three-volume report is responsive to the requirements of contract E (04-3)-1152 to provide a detailed methodology, to include management, technology, and socio-economic aspects, of a voluntary community program for computer-assisted peak load leveling and energy conservation in commercial community facilities. The demonstration project established proof-of-concept in reducing the kW-demand peak by the unofficial goal of 10%, with concurrent kWh savings. The report consists of the following three volumes: Volume I: management overview; Volume II: methodology and technology; and Volume III; appendices.

  13. Modular Radioisotope Thermoelectric Generator (RTG) Program. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-31

    Section 2.0 of this report summarizes the MOD-RTG reference flight design, and Section 3.0 discusses the Ground Demonstration System design. Multicouple technology development is discussed in Section 4.0, and Section 5.0 lists all published technical papers prepared during the course of the contract.

  14. GRoW Buffalo Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Bohm, Martha [Univ. at Buffalo, NY (United States)

    2016-04-17

    This document provides final reporting on the GRoW Home, University at Buffalo's entry to the 2015 Solar Decathlon competition in Irvine, CA. The report summarizes fundraising efforts, documents media outreach, lists online presence, analyzes the organizer's communication, describes post-competition life of the house and future employment plans for student team members. Last, it suggests improvements for future decathlons.

  15. Smart roadside initiative : final report.

    Science.gov (United States)

    2015-09-01

    This is the Final Report for the Smart Roadside Initiative (SRI) prototype system deployment project. The SRI prototype was implemented at weigh stations in Grass Lake, Michigan and West Friendship, Maryland. The prototype was developed to integrate ...

  16. Final progress report

    International Nuclear Information System (INIS)

    Blann, M.

    1978-01-01

    A summary is given of the main contributions made under the subject contract. A list of publications resulting therefrom, conference addresses, and contributed papers is appended. Titles of Ph.D. theses, M.S. theses, and the names of students doing the work are also summarized

  17. The use of micro-plasma radiofrequency technology in secondary skin graft contraction: 2 case reports.

    Science.gov (United States)

    Ding, Jin-Ping; Fang, Lin; Wang, Lian-Zhao

    2015-01-01

    Secondary skin graft contraction leading to cosmetic deformity remains a great challenge. These two case reports present serious skin graft contraction and the treatment with micro-plasma radiofrequency technology. Two patients presented with complaints of post-burn depigmentation on the forehead and the hand, respectively, and received dermabrasion and thin split-thickness skin grafting. Then, many localized contraction lesions occurred after 4 weeks. The treatment selected was non-surgical removal using micro-plasma radiofrequency technology with the following energy parameters: a roller tip at 80 watts, three passes in different directions. No complications were observed. The contracted skin was ablated without affecting the pigment distribution. The consequents were that the color, appearance, and texture of the grafted skin matched the adjacent skin well and had better patient acceptance.

  18. Demonstration, testing, ampersand evaluation of in situ heating of soil. Draft final report, Volume II: Appendices A to E

    International Nuclear Information System (INIS)

    Dev, H.; Enk, J.; Jones, D.; Saboto, W.

    1996-01-01

    This document is a draft final report for US DOE contract entitled, open-quotes Demonstration Testing and Evaluation of In Situ Soil Heating,close quotes Contract No. DE-AC05-93OR22160, IITRI Project No. C06787. This report is presented in two volumes. Volume I contains the technical report This document is Volume II, containing appendices with background information and data. In this project approximately 300 cu. yd. of clayey soil containing a low concentration plume of volatile organic chemicals was heated in situ by the application of electrical energy. It was shown that as a result of heating the effective permeability of soil to air flow was increased such that in situ soil vapor extraction could be performed. The initial permeability of soil was so low that the soil gas flow rate was immeasurably small even at high vacuum levels. When scaled up, this process can be used for the environmental clean up and restoration of DOE sites contaminated with VOCs and other organic chemicals boiling up to 120 degrees to 130 degrees C in the vadose zone. Although it may applied to many types of soil formations, it is particularly attractive for low permeability clayey soil where conventional in situ venting techniques are limited by low air flow

  19. Fossil Energy Program report, 1 October 1976--30 September 1977. [Objectives, progress and plans for each contract or project

    Energy Technology Data Exchange (ETDEWEB)

    Dunning, H. Neal; Batchelor, James; Crim, Winfred; Furlong, Leroy; Harvie, Robert; Hunter, Juanita; Jones, William; Karnes, Anita; Ludwig, Linda; Miller, C. Lowell; Mills, G. Alex; Sacks, Stephen; Watkins, J. Wade; Watson, Coni; Weaver, Val

    1978-08-01

    This report is an integral part of the documentation system of the Fossil Energy Program of the Department of Energy. It contains descriptions of each contract and project, arranged in conformance with planning and budgetary documents. The results of contracts are reported at various intervals, depending on the type of contract, but at least annually. These reports are not listed individually in the ''Publications'' sections but are available from the National Technical Information Service, U.S. Department of Commerce, Springfield, Virginia 22161. The Department of Energy also publishes several abstract journals: Fossil Energy Update, Energy Research Abstracts, and Energy Abstracts for Policy Analysis.

  20. Studies of high energy phenomena using muons. Final report

    International Nuclear Information System (INIS)

    1995-01-01

    This report covers the activities of the NIU high energy physics group as supported by DOE contract DE-FG02-91ER40641.A000 during the period from 1992 to 1995, and is the final report for this award. The group had three main efforts. The first was the D0 experiment at the Fermilab proton-antiproton collider, with major emphasis on its muon system. The second is the involvement of a portion of the group in Fermilab Experiment 789. Finally, the authors were members of the SDC collaboration at the SSC. The group consisted of four faculty members, three research associates, and undergraduate and graduate students. The D0 experiment at Fermilab is one of two (the other is CDF) general purpose experiments operating at the Tevatron proton-antiproton collider. Starting in the Fall of 1992, the first data collection occurred at D0. Physics publications are tabulated in the Appendix, with the discovery of the top quark in 1995 being the most prominent. Members of the NIU group worked on a variety of physics topics: Hedin on B-physics and the top-quark search, Fortner on Drell-Yan and other QCD topics, Green on di-Boson production, and Markeloff on excited-quark states. Hedin was also co-coordinator of the B-physics group during this period. The primary emphasis of the NIU D0 group was the muon system. NIU had particular responsibilities for data acquisition; chamber calibration; the Level-2 trigger; and the reconstruction. Hedin also was coordinator of muon software and had the responsibility for muon identification. Work on these items is summarized in a series of D0 Notes listed in the Appendix. Willis, Sirotenko, Hedin and Fortener were also members of the SDC collaboration at the SSC. NIU was a key participant in the calculation of low-energy neutron and photon backgrounds in the SDC experiment, and in designing shielding for the proposed muon system

  1. Horticulture Therapy Curriculum Development. Final Report.

    Science.gov (United States)

    Taylor, Sally; And Others

    This final report includes two major components: a narrative describing a project at Edmonds Community College, Washington, to develop a horticultural therapy curriculum and descriptions of six courses developed or revised during the project. The narrative reports the development of a supplementary interdisciplinary certification program to train…

  2. Public contracts in the Dutch energy sector. A strategic investigation with regard to normalisation

    International Nuclear Information System (INIS)

    Van der Feen, E.J.; Maas, P.J.J.

    1995-01-01

    A number of strategic investigations is carried out to determine if and to what extent normalization of public contracts can support the position of the Dutch businesses and industry in the European market. The strategic investigation in this report is limited to clusters within the Dutch energy utilities' sector concerning the production, transportation and distribution of electricity and heat, and the distribution of natural gas in the Netherlands. The results of this report can support those companies that will acquire orders via public contracts in the future; companies that wish to continue existing relations with tender services, if they will change to public contracts; and tender services that will have to put their orders via public contracts.Relevant European guidelines and accompanying procedures are outlined. The economic interest of the total Dutch energy sector and the different energy clusters in the Netherlands is discussed. Also attention is paid to the process of normalization, the role of standards and other technical documents regarding the guidelines Public Contracts. An inventory of available standards and conceptual standards is given for each energy cluster. Finally, an indication is given of the actual compliance of the guidelines. 5 figs., 4 tabs., 16 appendices

  3. NONLINEAR DYNAMICAL SYSTEMS - Final report

    Energy Technology Data Exchange (ETDEWEB)

    Philip Holmes

    2005-12-31

    This document is the final report on the work completed on DE-FG02-95ER25238 since the start of the second renewal period: Jan 1, 2001. It supplements the annual reports submitted in 2001 and 2002. In the renewal proposal I envisaged work in three main areas: Analytical and topological tools for studying flows and maps Low dimensional models of fluid flow Models of animal locomotion and I describe the progess made on each project.

  4. Analysis of sea water by difference chromatography. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Mangelsdorf, P.C. Jr.

    1977-02-01

    During the final period of this research contract the principal results obtained were: (a) the development of anion analysis by difference chromatography to the extent that SO/sub 4//sup =//Cl/sup -/ can be determined to better than 0.1 percent using an 0.5 ml seawater sample, (b) the determination of the ion-exchange cation complements of a variety of sediments in river water and in seawater, and (c) the discovery of a simple technique for the qualitative removal of NH/sub 4//sup +/ from seawater samples without altering the ratios of the other cations. This method supersedes the use of Cu-Chelex which has proved impossible to sustain.

  5. Contract Req Detailed Design Report Version 1: A C-BASS Component Contract Req Detailed Design Report Version 1: A C-BASS Component

    National Research Council Canada - National Science Library

    McGurin, Denis

    1999-01-01

    .... As part of the Corporate Business Application Software System (C-BASS) suite of work flow applications, Contract Req automates preparation of a requestor's procurement package as part of the contracting process for the U.S...

  6. The Public Sector and Obligation to Contract

    DEFF Research Database (Denmark)

    Olesen, Karsten Naundrup; Indén, Tobias

    2016-01-01

    The paper concerns the situation where public sector bodies are forced to enter into contracts. These obligations to contract are analysed from two angles. First, the paper offers an analysis of the reasons for imposing such obligations to contract under Swedish and Danish law. Secondly the paper...... discusses some consequences of the public entities’ obligations to contract, more specific consequences for the use of rules that usually regulate contracts and the fact that obligations to contract imposed on public entities establish a new market and at the same time the obligations deprive the entities...... of the freedom to contract which is a fundamental to market behaviour. Finally attention is drawn to the fact that obligations to contract are also imposed on private entities. The paper takes Swedish and Danish regulations as a point of departure and provides an insight into regulations from these two countries...

  7. A new research reactor? Report by the Select Committee for an inquiry into the contract for a new reactor at Lucas Heights

    International Nuclear Information System (INIS)

    2001-05-01

    On 15 August 2000, the Senate resolved to establish the Select Committee for an Inquiry into the Contract for a New Reactor at Lucas Heights and report to the Parliament. The Select committee majority report is divided into three parts: the need for a new reactor; the tendering process and the nature of the contract; and Australia's nuclear waste management strategy and public health and safety. There is a final chapter which brings together the major issues examined in the report. Based on the evidence presented to it, the Committee notes that some Australian scientists and engineers present a strong case for the new reactor. While the Committee is of the view that nuclear science and technology is not backward looking and does offer opportunities for researchers to keep at the forefront of important areas in scientific research and development it does not automatically follow that the best way to promote scientific and medical research in this country is by spending substantial amounts of public funds for the next forty years on a single research reactor. Nevertheless, the Committee recommends that before the Government proceeds any further with the proposed reactor, it undertake a thorough and comprehensive public review of funding for medical and scientific research in Australia with a view to assessing priorities including the role, if any, a research reactor would have in contributing to Australia's scientific, medical and industrial interests. The Committee also requested that the Australian National Audit Office consider examining the tender and contract documents for the new reactor at Lucas Heights with a view to determining: whether further investigation of the tendering process and the contract is warranted; whether, during the tendering process, ANSTO ensured that there was adequate and appropriate independent verification and validation of the tenderers claims. Two supplementary report are included: one from the Liberal and National members (minority

  8. Solvent-refined-coal (SRC) process. Volume II. Sections V-XIV. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1982-05-01

    This report documents the completion of development work on the Solvent Refined Coal Process by The Pittsburgh and Midway Coal Mining Co. The work was initiated in 1966 under Office of Coal Research, US Department of Interior, Contract No. 14-01-0001-496 and completed under US Department of Energy Contract No. DE-AC05-79ET10104. This report discusses work leading to the development of the SRC-I and SRC-II processes, construction of the Fort Lewis Pilot Plant for the successful development of these processes, and results from the operation of this pilot plant. Process design data generated on a 1 ton-per-day Process Development Unit, bench-scale units and through numerous research projects in support of the design of major demonstration plants are also discussed in summary form and fully referenced in this report.

  9. Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Aristos Aristidou Natureworks); Robert Kean (NatureWorks); Tom Schechinger (IronHorse Farms, Mat); Stuart Birrell (Iowa State); Jill Euken (Wallace Foundation & Iowa State)

    2007-10-01

    The two main objectives of this project were: 1) to develop and test technologies to harvest, transport, store, and separate corn stover to supply a clean raw material to the bioproducts industry, and 2) engineer fermentation systems to meet performance targets for lactic acid and ethanol manufacturers. Significant progress was made in testing methods to harvest corn stover in a “single pass” harvest mode (collect corn grain and stover at the same time). This is technically feasible on small scale, but additional equipment refinements will be needed to facilitate cost effective harvest on a larger scale. Transportation models were developed, which indicate that at a corn stover yield of 2.8 tons/acre and purchase price of $35/ton stover, it would be unprofitable to transport stover more than about 25 miles; thus suggesting the development of many regional collection centers. Therefore, collection centers should be located within about 30 miles of the farm, to keep transportation costs to an acceptable level. These collection centers could then potentially do some preprocessing (to fractionate or increase bulk density) and/or ship the biomass by rail or barge to the final customers. Wet storage of stover via ensilage was tested, but no clear economic advantages were evident. Wet storage eliminates fire risk, but increases the complexity of component separation and may result in a small loss of carbohydrate content (fermentation potential). A study of possible supplier-producer relationships, concluded that a “quasi-vertical” integration model would be best suited for new bioproducts industries based on stover. In this model, the relationship would involve a multiyear supply contract (processor with purchase guarantees, producer group with supply guarantees). Price will likely be fixed or calculated based on some formula (possibly a cost plus). Initial quality requirements will be specified (but subject to refinement).Producers would invest in harvest

  10. AIPM Final Report

    Energy Technology Data Exchange (ETDEWEB)

    John Mookken

    2006-06-30

    The final AIPM project report consists of six sections. Each section includes information on the original AIPM project and extension work on the high temperature design. The first section (1) provides an overview of the program and highlights the significant targets to meet at the end of the program. The next section (2) summarizes the significant technical accomplishments by the SEMIKRON AIPM team during the course of the project. Greater technical details are provided in a collection of all the quarterly reports which can be found in the appendix. Section three (3) presents some the more significant technical data collected from technology demonstrators. Section four (4) analyzes the manufacturing cost or economic aspects of producing 100,000 units/yr. Section five (5) describes the commercialization efforts of the AIPM technology into the automotive market. The last section (6) recommends follow on work that will build on the efforts and achievements of the AIPM program.

  11. Final report, Feedback limitations of photosynthesis

    Energy Technology Data Exchange (ETDEWEB)

    Sharkey, Thomas D.

    1999-07-22

    Final report of research on carbon metabolism of photosynthesis. The feedback from carbon metabolism to primary photosynthetic processes is summarized, and a comprehensive list of published scientific papers is provided.

  12. 48 CFR 542.1107 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Production Surveillance and Reporting 542.1107 Contract... clause may be used in indefinite-delivery definite-quantity contracts for Stock or Special Order Program...

  13. 48 CFR 49.112-2 - Final payment.

    Science.gov (United States)

    2010-10-01

    ... voucher or invoice and forward the documents to the disbursing officer for payment. (b) Settlement by...) Construction contracts. In the case of construction contracts, before forwarding the final payment voucher, the... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Final payment. 49.112-2...

  14. The hydrological impacts of energy crop production in the UK. Final report

    OpenAIRE

    Finch, J. W.; Hall, R. L.; Rosier, P. T. W.; Clark, D. B.; Stratford, C.; Davies, H. N.; Marsh, T. J.; Roberts, J. M.; Riche, A.; Christian, D.

    2004-01-01

    This report describes the work carried out between March 2002 and January 2004 under ETSU Contract number B/CR/000783/00/00 by the Centre for Ecology and Hydrology, Wallingford. It also describes the results of measurements made by Rothamsted Research staff under a sub-contract. The objectives of this work are: 1. To determine the effects on water availability at the catchment and sub-catchment scale, of production of energy crops, across England and Wales. 2. To indicate areas where...

  15. The missing link between maintenance contracts and flexible asset management

    OpenAIRE

    Marttonen-Arola, Salla; Viskari, Sari; Kärri, Timo

    2013-01-01

    The paper shows how additional value can be created in maintenance collaboration through integrating the features of flexible asset management into maintenance contracts. We expand the traditional typology of maintenance contracts and introduce a new contract type, flexible asset management contracts. Also value sharing in the new contract type is discussed. Our logic for sharing the value is based on reaching for win-win situations in industrial maintenance collaboration. Finally, we present...

  16. Child-Specific Exposure Scenarios Examples (Final Report)

    Science.gov (United States)

    EPA announced the availability of the final report, Child-Specific Exposure Scenarios Examples. This report is intended to be a companion document to the Exposure Factors Handbook (U.S. EPA 2011). The example scenarios were compiled from questions and inquiries r...

  17. Listing of engineering research contract reports under the DREAM, AERD and ERDAF programs of the Research Branch, 1973-1988

    Energy Technology Data Exchange (ETDEWEB)

    Morrison, B A; Thuns, A; Feldman, M

    1988-01-01

    To supplement in-house investigations, Agriculture Canada contracted out research in a number of programs including three which supported engineering work. This document lists the contracts awarded under the programs and provides reference citations of the contract reports. Reports are grouped by file number, scientific authority, author or contractor, and subject, and a subject index is also included. The three programs are: Development, Research and Evaluation in Agricultural Mechanization (DREAM), Agricultural Engineering Research and Development Program (AERD), and Energy Research and Development in Agriculture and Food (ERDAF). AERD, which replaced DREAM, has been terminated, but the ERDAF program is still continuing as of the date of this document.

  18. Defense Contracting: Use of Undefinitized Contract Actions Understand and Definitization Time Frames Often Not Met

    National Research Council Canada - National Science Library

    2007-01-01

    ...), which authorize contractors to begin work before reaching a final agreement on contract terms. The contractor has little incentive to control costs during this period, creating a potential for wasted taxpayer dollars...

  19. Revised data book for evaluation of combustion and gasification models: Final report, Volume 3

    Energy Technology Data Exchange (ETDEWEB)

    Christensen, K.R.; Rasband, M.W.; Smoot, L.D.

    1987-10-01

    During the previous contract (DE-AC21-81MC16518) a major task was to identify, collect and publish detailed experimental data for evaluation of comprehensive gasification/combustion codes. A review of the literature was completed and prospective data were identified for inclusion in this data book in five categories of increasing complexity: (1) non-reacting, gaseous flows (58 cases); (2) non-reacting, particle-laden flows (43 cases); (3) gaseous combustion (34 cases); (4) pulverized coal combustion (57 cases); (5) entrained coal gasification (6 cases). Selection of these data was based on a set of criteria which included data completeness, availability of detailed, digital profiles for several properties (e.g., species concentrations, velocity, temperature) and data accuracy. From these 198 cases, which were referenced in the final report (Vol. III), the data base was reduced to a total of 35 sets of data from 8 laboratories, with at least 3 cases in each category above. For these 35 cases, the measured data, together with geometrical dimensions and test conditions were documented in a uniform tabular format. These data were also stored on a magnetic tape for distribution. During this follow-on contract (DE-AC21-85MC22059), the accuracy of the data was checked and several additional corrections were made. The format for reporting the data (Appendix B) was simplified. Also, a review of additional data sets available from the Combustion Laboratory and other sources was completed. In all, 213 cases from 52 investigators at 18 laboratories were considered and 37 cases are included in this data book from 22 different investigations at 8 independent laboratories. 81 refs.

  20. Managing the financial cost of exception to contracting standards

    DEFF Research Database (Denmark)

    Henschel, Rene Franz

    2008-01-01

    In managing financial cost of exception to contracting standards, the first step is to put up an intelligent contract standards exception monitoring system The next step is to maintain tailor-made, fair and transparent contracting standards The third step is to eliminate unnecessary information...... and repetitiveness in contracting standards The fourth step is to enable your organization and the customers or suppliers to handle the necessary exceptions themselves Finally you should consider the use of independent contracting standards and elimination of your own standards as a tool in managing the cost...

  1. Analysis of foreign petroleum contracts

    International Nuclear Information System (INIS)

    Moran, S.S.

    1991-01-01

    Most foreign exploration and production contracts are of two basic types: Production-Sharing contracts in which a portion of oil revenues, 'cost oil,' is available to the contractor for recoupment of exploration and production costs with the remainder, 'profit oil,' being shared according to an agreed-upon formula, and the familiar Tax-Royalty contract in which a share of petroleum revenues goes to the host country 'off the top' as royalties, and operating profits are taxed at the going rate. Bottom line splits of profits between host governments and contractors, which are approximately 50-50 in the United States, are typically in the 60-40 to 85-15 range elsewhere, with lower profit shares being offset by the higher volume potential and lower costs that may be associated with less mature exploration areas. Foreign contract qualities can be grossly compared by walking typical field models through the contracts to arrive at the bottom line profit splits. Variations within the contract forms include government participation, sliding scale contract elements, special taxes related to rates of return, etc. Often, contract terms are subject to negotiation and the tradeoffs between contract elements must be understood. Contract life, amortization schedules, fund repatriation, currency exchange rates, and the interaction of foreign and United States tax regimens are among the other factors that must be considered. Final decisions on foreign ventures must combine consideration of contracts, economic projections, hydrocarbon volumes, exploration cost estimates, and the estimated probability of success into an overall project assessment

  2. Moonshot Panel Moving Toward Final Report

    Science.gov (United States)

    An NCI Cancer Currents blog from acting NCI Director Dr. Doug Lowy providing an update on the activities of the National Cancer Moonshot Initiative’s Blue Ribbon Panel and its work to develop a final report.

  3. Comparative analysis of JKR Sarawak form of contract and Malaysia Standard form of building contract (PWD203A)

    Science.gov (United States)

    Yunus, A. I. A.; Muhammad, W. M. N. W.; Saaid, M. N. F.

    2018-04-01

    Standard form of contract is normally being used in Malaysia construction industry in establishing legal relation between contracting parties. Generally, most of Malaysia federal government construction project used PWD203A which is a standard form of contract to be used where Bills of Quantities Form Part of the Contract and it is issued by Public Works Department (PWD/JKR). On the other hand in Sarawak, the largest state in Malaysia, the state government has issued their own standard form of contract namely JKR Sarawak Form of Contract 2006. Even both forms have been used widely in construction industry; there is still lack of understanding on both forms. The aim of this paper is to identify significant provision on both forms of contract. Document analysis has been adopted in conducting an in-depth review on both forms. It is found that, both forms of contracts have differences and similarities on several provisions specifically matters to definitions and general; execution of the works; payments, completion and final account; and delay, dispute resolution and determination.

  4. 48 CFR 252.235-7011 - Final scientific or technical report.

    Science.gov (United States)

    2010-10-01

    ... technical report. 252.235-7011 Section 252.235-7011 Federal Acquisition Regulations System DEFENSE... CLAUSES Text of Provisions And Clauses 252.235-7011 Final scientific or technical report. As prescribed in 235.072(d), use the following clause: Final Scientific or Technical Report (NOV 2004) The Contractor...

  5. LHC Civil Engineering Construction Contracts Cost Monitoring and Budget Forecasting

    CERN Document Server

    Skelton, K

    2000-01-01

    The Civil Engineering project for the LHC is estimated at 350 MCHF, of which about 316 MCHF is for the construction contracts. These contracts are based on a system of remeasurement whereby the consultant estimates the quantities required for the construction of each structure and the contractor commits himself to the unit price, which define the initial tender price. There are many factors that affect the final price for these contracts, from increases or decreases in quantities of the estimated amounts in the original bill of quantities to variations to the contract. This paper will look at how these factors change costs at the individual level of a structure to the overall costs of the contract. It will look at how the Civil Engineering Group monitors these changes to calculate cash flows and final costs and how this information is used as a basis for budget forecasts.

  6. RODOS User's Group: Final project report. Contract number: F14P- CT98-0075

    International Nuclear Information System (INIS)

    Sinkko, K.; Ammann, M.

    2001-03-01

    Prior to 1998, the development of RODOS, a decision support system designed for the management of nuclear emergencies, had been carried out almost entirely by research scientists and engineers. The end-users/operators had little or no input into this development. To redress this situation, the RODOS Users Group (RUG) was established in 1998 under a Concerted Action Contract between the European Commission and STUK. The main objectives of this group were to encourage the emergency management community to use such a system, to provide a forum for end-users to share their experience in the use of such systems and to provide feedback from the end-users to the model and system developers in regard to operational problems and required improvements. The contract, which commenced on 1st September 1998, was for a period of two years. During this period, RUG established a www homepage, planned and performed two nuclear accident exercises and held four meetings. Technically the Web page operated very well. State-of-the-art Internet technology provided an efficient communication channel at low cost. The membership of the RUG was, however, too low to maintain a lively and ongoing discussion in parallel with the RODOS project Web page. This experience would suggest that it might have been better to have operated a Web page for RUG on the RODOS project Web-site rather than an independent RUG Web-site. Exercises based on fixed accident scenarios proved to be an appropriate means of highlighting issues that needed to be discussed between users and developers and to stimulate and motivate the end-users to maintain and further develop the system. Such exercises also promoted further activity in the field of emergency management. The organisation and administration of realistic exercises are time consuming, laborious and expensive. It is therefore very important that the maximum benefit is achieved from such exercises. The use of analytical evaluation methods could be better employed

  7. Audit Report on Management Controls over the Use of Service Contracts at the Office of River Protection

    International Nuclear Information System (INIS)

    2009-01-01

    The Department of Energy's (Department) Office of River Protection (ORP) is responsible for the storage, treatment, and disposal of over 53 million gallons of highly radioactive waste from over 40 years of plutonium production at the Hanford Site. Because of the diversity, complexity, and large scope of its mission, coupled with its small staff, ORP told us that it has found it necessary to engage in service contracts to obtain consulting services, technical expertise, and support staff. Federal policy generally permits contractors to perform a wide range of support service activities, including, in most situations, the drafting of Government documents subject to the review and approval of Federal employees. Federal policy issued by the Office of Management and Budget, however, prohibits contractors from drafting agency responses to Congressional inquiries and reports issued by the Office of Inspector General and Government Accountability Office (GAO) because they are so closely related to the public interest and provide the appearance of private influence. To provide a majority of its needed services, ORP issued a Blanket Purchase Agreement to Project Assistance Corporation (PAC) in 2003. Through the Blanket Purchase Agreement, ORP acquired services in the areas of project management, risk assessment, program assessment, quality assurance, safety, cost and schedule estimating, budgeting and finance, and engineering. PAC has, in turn, subcontracted with various other firms to obtain some of the services needed by ORP. From 2005 to 2008, the total annual cost for the contract with PAC had grown from $4.7 million to $9.2 million. Because of the extent of the services provided and growing costs of the contract, we conducted this review to determine whether ORP appropriately administered its contract with the Project Assistance Corporation. Our review disclosed that, in some instances, ORP had not appropriately administered all work performed under the PAC contract

  8. FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Burger, Chris [Patrick Engineering Inc., Lisle, IL (United States); Wortman, David [Patrick Engineering Inc., Lisle, IL (United States); Brown, Chris [Battelle Memorial Inst., Richland, WA (United States); Hassan, Syed [Gulf Interstate Engineering, Houston, TX (United States); Humphreys, Ken [Futuregen Industrial Alliance, Inc., Washington, D.C. (United States); Willford, Mark [Futuregen Industrial Alliance, Inc., Washington, D.C. (United States)

    2016-03-31

    The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipeline and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration

  9. Galilean contractions of W-algebras

    Directory of Open Access Journals (Sweden)

    Jørgen Rasmussen

    2017-09-01

    Full Text Available Infinite-dimensional Galilean conformal algebras can be constructed by contracting pairs of symmetry algebras in conformal field theory, such as W-algebras. Known examples include contractions of pairs of the Virasoro algebra, its N=1 superconformal extension, or the W3 algebra. Here, we introduce a contraction prescription of the corresponding operator-product algebras, or equivalently, a prescription for contracting tensor products of vertex algebras. With this, we work out the Galilean conformal algebras arising from contractions of N=2 and N=4 superconformal algebras as well as of the W-algebras W(2,4, W(2,6, W4, and W5. The latter results provide evidence for the existence of a whole new class of W-algebras which we call Galilean W-algebras. We also apply the contraction prescription to affine Lie algebras and find that the ensuing Galilean affine algebras admit a Sugawara construction. The corresponding central charge is level-independent and given by twice the dimension of the underlying finite-dimensional Lie algebra. Finally, applications of our results to the characterisation of structure constants in W-algebras are proposed.

  10. Development of a thermionic-reactor space-power system. Final summary report

    International Nuclear Information System (INIS)

    1973-01-01

    Initial experimental work led to the award of the first AEC thermionic contract on May 1, 1962, for the development of fission heated thermionic cells with an operating life of 10,000 hours or more. Two types of converters were fabricated: (1) electrically heated, and (2) fission heated where the fuel was either uranium carbide or uranium oxide. Competition between GGA and GE was climaxed on July 1, 1970 by the award to GGA of a contract to develop an in-core thermionic reactor. This report is divided into the following: thermionic research, materials technology, thermionic fuel element development, reactor technology, and systems technology

  11. IEA PVPS Task 1 - UK Expert. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Gunning, R.

    2003-07-01

    The paper relates to work carried out under contract to the UK Renewable Energy Programme, and describes the terms of reference of the UK representation in the IEA PVPS Task 1 which provides a forum for exchange of information on photovoltaic (PV) technology between 21 participating countries. The main benefit derived by the UK is access to international expertise in PV technology. Using information obtained from participation in Task 1, the UK produces a National Survey Report which reports on developments in PV technology in the UK over the previous 12 months. The report covers installed capacity, prices, budgets and costs: it is freely available on the UK PVPS website. The newsletter PV Power, is prepared and distributed biannually - 18 issues have been published by mid-2003. IT Power is currently the UK representative on the IEA PVPS Task 1.

  12. Gammasphere software development. Final report, May 15, 1992 - August 14, 1996

    International Nuclear Information System (INIS)

    Piercey, Rodney B.

    1999-01-01

    This report describes the activities of the nuclear physics group at Mississippi State University, which were performed under contract DE-FG05-92ER40726 with the Department of Energy. Under the contract, the nuclear physics group at MSU provided leadership for the Gammasphere Software Working Group (SWG) and developed software and software standards. The SWG held four workshops during the term of the contract to inform committee members and interested parties of development in software and computer technologies and summaries of the presentations and discussions were compiled for distribution. These summaries have been distributed to interested members of the nuclear physics community and copies are included with this report. SWG subcommittees were organized to address specific issues and reports were given to the full SWG at each meeting. The subcommittee on a ''standard format for histogram data'' developed a format that was presented to the Gammasphere Users' Group and has been provided to interested parties. Other subcommittees were organized to address issues of parallel computing and graphical user interfaces at GammaSphere. We worked closely with Robert Varner and Bill Milner at ORNL in adapting and testing the ORNL histogram display software (UPAK) for use on SPARC-based workstations. The software was ported by ORNL staff to the Solaris OS and tests were run at MSU. We also investigated ways to enhance the OpenLook compatibility and user interface of the ORNL display package. The SWG interacted closely with researchers at Lawrence Berkeley Laboratory (LBL). A Mississippi State University (MSU) graduate student, Pete Varmette, worked at LBL during the summer of 1992 and assisted Robert Belshe in the development of the GammaSphere Liquid Nitrogen Control System. Mr. Belshe sat on the research committee to review Mr. Varmette's master thesis, which contains a fill description of this work and is included with this report

  13. Final Report on Contract DE-AI02-04ER63703

    Energy Technology Data Exchange (ETDEWEB)

    Joseph Michalsky

    2005-12-07

    This report includes results for the entire period of this award 9 September 2003 through 14 February 2005. Two contributions were in broadband shortwave irradiance measurements. One included conducting the second diffuse horizontal broadband shortwave irradiance IOP to establish a working standard for diffuse horizontal shortwave irradiance, where none exists. The results are summarized in a paper published in the Journal of Geophysical Research-Atmospheres. Another broadband shortwave effort was in the comparison of clear-sky measurements of broadband diffuse and direct irradiance during the May 2003 Aerosol IOP with six radiative transfer models of direct and diffuse irradiance using aerosol and other data inputs carefully measured during the Aerosol IOP. A paper with the results has been submitted to the Journal of Geophysical Research-Atmospheres; it is in review. A third area of research was in spectral radiative transfer model comparisons made using three models and measurements made with the visible rotating shadowband spectroradiometer (RSS) during the first diffuse irradiance IOP in 2001. Besides these contributions that have resulted in papers and/or presentations, the principal investigator (PI) consulted with science team and infrastructure representatives to improve aerosol optical depth measurements and to produce a spectral surface albedo product.

  14. Virtualized Network Control. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Ghani, Nasir [Univ. of New Mexico, Albuquerque, NM (United States)

    2013-02-01

    This document is the final report for the Virtualized Network Control (VNC) project, which was funded by the United States Department of Energy (DOE) Office of Science. This project was also informally referred to as Advanced Resource Computation for Hybrid Service and TOpology NEtworks (ARCHSTONE). This report provides a summary of the project's activities, tasks, deliverable, and accomplishments. It also provides a summary of the documents, software, and presentations generated as part of this projects activities. Namely, the Appendix contains an archive of the deliverables, documents, and presentations generated a part of this project.

  15. Final Project Report Project 10749-4.2.2.1 2007-2009

    Energy Technology Data Exchange (ETDEWEB)

    Zacher, Alan H.; Holladay, Johnathan E.; Frye, J. G.; Brown, Heather M.; Santosa, Daniel M.; Oberg, Aaron A.

    2009-05-11

    This is the final report for the DOE Project 10749-4.2.2.1 for the FY2007 - FY2009 period. This report is non-proprietary, and will be submitted to DOE as a final project report. The report covers activities under the DOE Project inside CRADA 269 (Project 53231) as well as project activites outside of that CRADA (Project 56662). This is the final report that is summarized from the non-proprietary quarterlies submitted to DOE over the past 2.5 years, which in turn are summaries from the proprietary technical reporting to UOP.

  16. DANAERO MW: Final Report

    DEFF Research Database (Denmark)

    Troldborg, Niels; Bak, Christian; Aagaard Madsen, Helge

    This report describes the results of the EUDP funded DANAERO MW II project carried out by DTU Wind Energy (formerly Risø DTU) and the industrial partners, LM Wind Power, Vestas Wind Systems A/S and Siemens Wind Power. An overview of the data available from the project as well as the results from...... analysis of the data is given with the main objective to explore in detail the influence of atmospheric and wake turbulence on MW turbine performance, loading and stability. Finally, validation and demonstration of simulation codes are carried out....

  17. The Brent Contract for Differences (CFD)

    International Nuclear Information System (INIS)

    Barrera-Rey, F.; Seymour, A.

    1996-01-01

    The market for Brent Contracts-for-Differences (CFDs) emerged as early as 1988 but its significant development did not occur until 1992. By financial market standards, however, this span of life is fairly long. Yet the characteristics and role of this oil trading instrument have not been seriously studied. This study aims at filling a gap in research on the Brent market complex which includes spot trades, a 15-day forward and futures contracts, various derivatives and, finally, the less well documented CFD. Chapters 2 and 3 aim to describe and explain the characteristics of the CFD market, in particular the evolution in contract terms and the composition of participants. (UK)

  18. Bottlenecks and contracts

    International Nuclear Information System (INIS)

    2001-01-01

    The report surveys the central points in the literature about contracts on geographical price differences and transmission rights in the power market. It is commonly believed that such contracts may reduce market power and contribute to better network investments. The theoretical debate is in part unfinished and largely based on very stylised assumptions. There is some indication that such contracts may not be very useful in practice. But they may be useful in some cases, perhaps in particular when power is transported outside limited surplus areas and for certain investment decisions where there is no systems operator with a natural responsibility

  19. The project for an energy-enriched curriculum: Final report

    Energy Technology Data Exchange (ETDEWEB)

    1984-01-01

    The Project for an Energy-Enriched Curriculum (PEEC) reported was a long-running effort at infusing energy/environment/economics (E/E/E) themes into the K-12 curriculum. While it was conducted as a single integrated effort by the National Science Teachers Association (NSTA), it is supported by a series of contracts and grants, during the period 1976 to 1984, from the Energy Research and Development Administration (ERDA) and the US Department of Energy (DOE).

  20. Quick Reaction Report on the Audit of the Army Contract with the University of Texas at Austin Institute for Advanced Technology

    Science.gov (United States)

    1992-10-27

    Oct 27, 1992 Title: Audit Report Office Of The Inspector General: Quick Reaction Report On The Audit Of The Army Contract With The University Of Texas...ENGINEERING "INSPECTOR GENERAL, DEPARTMENT OF THE ARMY SUBJECT: Quick-Reaction Report on the Audit of the Army Contract with the University of Texas...additional comments on Recommendation 3. by November 27, 1992. The courtesies extended to the audit staff are appreciated. If you have any questions on

  1. National energy peak leveling program (NEPLP). Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-12-01

    This multisectioned three-Volume report is responsive to the requirements of Contract E (04-3)-1152 to provide a detailed methodology, to include management, technology, and socio-economic aspects, of a voluntary community program of computer-assisted peak load leveling and energy conservation in commercial community facilities. The demonstration project established proof-of-concept in reducing the kW-demand peak by the unofficial goal of 10%, with concurrent kWh savings. This section of volume III contains appendixes of information on load shedding determination, analysis, socio-economic study, contractual cross references, and definitions.

  2. A contract-law perspective on legal cases in financial reporting: the Netherlands, 1880-1970

    NARCIS (Netherlands)

    Camfferman, C.

    2012-01-01

    This paper proposes a framework for the historical analysis of judicial decisions in financial reporting that may provide a basis for comparative research in the historical relation between the law and accounting. It is suggested that contract law may have been the dominant legal domain in which

  3. [A high resolution projection electron spectrometers]: Final report 1978-1987

    International Nuclear Information System (INIS)

    1988-01-01

    The main emphasis of the work has been to study inner shell ionization processes. The signatures have been K x-rays or K Auger transitions. We have worked with semiconductor or Bragg x-ray spectrometers. Toward the end of the contract we concentrated on projectile electron spectroscopy. These topics and other atomic physics projects are described briefly in this progress report

  4. Claims for Unabsorbed Overhead on Defense Contracts.

    Science.gov (United States)

    1985-09-01

    coat which, under the provisions of any pertinent law, regulation, or contract, cannot be included in prices, cost reimbureements , or settlements...ruled that the contractor was due some reimbursement . " - Allegheny appealed the contracting officer’s determination a second time questioning how much...amount of reimbursement . The final opinion also added the cost that was substantiated for replacement of operators and make-up pay. Therefore, the

  5. Final Project Report for Award ER65581

    Energy Technology Data Exchange (ETDEWEB)

    Stoy, Paul C. [Montana State Univ., Bozeman, MT (United States)

    2017-07-13

    The attached final project report describes contributions of Montana State University (MSU) to the project "Bridging land-surface fluxes and aerosol concentrations to triggering convective rainfall" (PI: Fuentes).

  6. Characterization of nuclear reactor containment penetrations. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Shackelford, M.H.; Bump, T.R.; Seidensticker, R.W.

    1985-02-01

    This report concludes a preliminary report prepared by ANL for Sandia, published as NUREG/CR-3855, in June 1984. The preliminary report, NUREG/CR-3855, presented the results of a survey of nuclear reactor containment penetrations, covering the number of plants surveyed at that time (22 total). Since that time, an additional 26 plants have been included in the survey. This final report serves two purposes: (1) to add the summary data sheets and penetration details for the additional plants now included in the survey; and (2) to confirm, revise, or add to analyses and discussions presented in the first report which, of course, were based solely on the earlier sample of 22 plants. This final report follows the outline and format of the preliminary survey report. In general, changes and additions to the preliminary report are implied, rather than stated as such to avoid repeated reference to that report. If no changes have been made in a section the title of the section of the previous report is simply repeated followed by ''No Changes''. Some repetition is used for continuity and clarity.

  7. Stratospheric tritium sampling. Final progress report

    International Nuclear Information System (INIS)

    Mason, A.S.; Oestlund, H.G.

    1985-09-01

    Stratospheric tritium sampling was part of Project Airstream (sponsored by the US Department of Energy) between 1975 and 1983. Data from the final deployment in November 1983 are reported here, and the results of the 9 years of effort are summarized. 9 refs., 2 figs., 2 tabs

  8. 48 CFR 1852.235-73 - Final Scientific and Technical Reports.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Final Scientific and Technical Reports. 1852.235-73 Section 1852.235-73 Federal Acquisition Regulations System NATIONAL..., including recommendations and conclusions based on the experience and results obtained. The final report...

  9. 76 FR 44948 - Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Science.gov (United States)

    2011-07-27

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Status Report of Water Service, Repayment, and Other Water- Related Contract Actions AGENCY: Bureau of Reclamation, Interior. ACTION: Notice. SUMMARY... SUPPLEMENTARY INFORMATION section. FOR FURTHER INFORMATION CONTACT: Michelle Kelly, Water and Environmental...

  10. Fundamental studies of fusion plasmas. Final report

    International Nuclear Information System (INIS)

    Aamodt, R.E.

    1998-01-01

    Lodestar has carried out a vigorous research program in the areas of rf, edge plasma and divertor physics, with emphasis largely geared towards improving the understanding and performance of ion-cyclotron heating and current drive (ICRF) systems. Additionally, a research program in the field of edge plasma and divertor modeling was initiated. Theoretical work on high power rf sheath formation for multi-strap rf arrays was developed and benchmarked against recent experimental data from the new JET A2 antennas. Sophisticated modeling tools were employed to understand the sheath formation taking into account realistic three-dimensional antenna geometry. A novel physics explanation of an observed anomaly in the low power loading of antennas was applied to qualitatively interpret data on DIII-D in terms of rf sheaths, and potential applications of the idea to develop a near-field sheath diagnostic were explored. Other rf-wave related topics were also investigated. Full wave ICRF modeling studies were carried out in support of ongoing and planned tokamaks experiments, including the investigation of low frequency plasma heating and current drive regimes for IGNITOR. In a cross-disciplinary study involving both MHD and ICRF physics, ponderomotive feedback stabilization by rf was investigated as a potential means of controlling external kink mode disruptions. In another study, the instability of the ion hybrid wave (IHW) in the presence of fusion alpha particles was studied. In the field of edge plasma and divertor modeling studies, Lodestar began the development of a theory of generalized ballooning and sheath instabilities in the scrape off layer (SOL) of divertor tokamaks. A detailed summary of the technical progress in these areas during the contract period is included, as well as where references to published work can be found. A separate listing of publications, meeting abstracts, and other presentations is also given at the end of this final report

  11. CHP plant Legionowo Poland - Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-12-01

    In 1997, a new Energy Law was passed in Poland. An important element of the law is that local energy planning is made obligatory. The law describes obligatory tasks and procedures for Polish municipalities related to planning and organisation of the energy sector. With the objective of supporting the Polish municipalities in their obligations according to the energy law of 1997, the project 'Energy Planning in Poland at Municipal Level - Support to Decision Makers' was launched. As part of the project, Municipal Guideline Reports have been elaborated for three model municipalities. These guidelines present the basis for the Energy Supply Plans in these municipalities. For the city of Legionowo, the following was recommended: 1. The planning processes initiated during the project should be continues/followed up, 2. Master Plan for the district heating system should be prepared, 3. The possibilities of establishment of a major natural gas-fired CHP plant of the Combined Cycle type should be investigated. The present report is the final Master Plan based on the following reports: Master Plan for Legionowo - Status Report; Master Plan for Legionowo - Hydraulic Analysis; CHP Plant Legionowo Poland - CHP Feasibility Analysis. The final Master Plan describes the status in the DH Company in Legionowo, possible improvements and an investment plan for the selected scenario. (BA)

  12. 75 FR 42774 - Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Science.gov (United States)

    2010-07-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Status Report of Water Service, Repayment, and Other Water- Related Contract Actions AGENCY: Bureau of Reclamation, Interior. ACTION: Notice. SUMMARY... region in the SUPPLEMENTARY INFORMATION section. FOR FURTHER INFORMATION CONTACT: Michelle Kelly, Water...

  13. 76 FR 73674 - Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Science.gov (United States)

    2011-11-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Status Report of Water Service, Repayment, and Other Water- Related Contract Actions AGENCY: Bureau of Reclamation, Interior. ACTION: Notice. SUMMARY... INFORMATION CONTACT: Michelle Kelly, Water and Environmental Resources Division, Bureau of Reclamation, P.O...

  14. Southeastern Regional Geologic Characterization Report. Executive summary. Final report

    International Nuclear Information System (INIS)

    1985-08-01

    This Executive Summary of the final Southeastern Regional Geologic Characterization Report (RGCR) is issued primarily for public information purposes, and provides a general overview of the report. The complete RGCR presents available regional geologic information pertinent to siting a repository for high-level nuclear waste in crystalline rock in central Maryland; noncoastal Virginia, North Carolina, and South Carolina; and northern Georgia. For each of the states within the Southeastern Region, information is provided on the geologic disqualifying factor and the geologic regional screening variables to be used in region-to-area screening

  15. Northeastern Regional Environmental Characterization Report. Executive summary. Final report

    International Nuclear Information System (INIS)

    1985-08-01

    This Executive Summary of the final Northeastern Regional Environmental Characterization Report (RECR) is issued primarily for public information purposes and provides a general overview of the report. The complete RECR presents available regional environmental information pertinent to siting a repository for high-level nuclear waste in crystalline rock in Connecticut, Maine, Massachusetts, New Hampshire, New Jersey, New York, Pennsylvania, Rhode Island, and Vermont. For each of the states within the Northeastern Region, information is provided on the environmental disqualifying factors and the environmental regional screening variables to be used in region-to-area screening

  16. Southeastern Regional Environmental Characterization Report: executive summary. Final report

    International Nuclear Information System (INIS)

    1985-08-01

    This Executive Summary of the final ''Southeastern Regional Environmental Characterization Report'' (RECR) is issued primarily for public information purposes and provides a general overview of the report. The complete RECR presents available regional environmental information pertinent to siting a repository or high-level nuclear waste in crystalline rock in central Maryland; noncoastal Virginia, North Carolina, and South Carolina; and northern Georgia. For each of the states within the Southeastern Region, information is provided on the environmental disqualifying factors and the environmental regional screening variables to be used in region-to-area screening

  17. Informal Progress Report Contract Number: DE-FG03-02NA00074/A000

    International Nuclear Information System (INIS)

    Brune, Carl R.; Grimes, Steven M.

    2003-01-01

    OAK B127 We report on work performed under contract DE-FG03-03NA00074 since January 1,2003. The research is in the area of low energy nuclear reactions and nuclear structure. The progress on research on level densities and improvement to R-Matrix calculations are presented. The preparations to begin high resolution experiments on p-shell nuclei are reviewed

  18. Research in High Energy Physics. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Conway, John S.

    2013-08-09

    This final report details the work done from January 2010 until April 2013 in the area of experimental and theoretical high energy particle physics and cosmology at the University of California, Davis.

  19. Leven estuary project. Fisheries Department final report

    OpenAIRE

    Bayliss, B.D.

    1997-01-01

    This is the report on the Leven estuary project: Fisheries Department final report produced by the Environment Agency North West in 1997. This report contains information about Leven estuary, river Leven catchment, river Crake catchment and the Ulverston Discharges. The Leven estuary is characterised by being very shallow, and shares the extremely variable tides and currents that characterize the whole of Morecambe Bay. There was little detailed knowledge of the impact on the Leven estuary, a...

  20. 75 FR 82066 - Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Science.gov (United States)

    2010-12-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Status Report of Water Service, Repayment, and Other Water- Related Contract Actions AGENCY: Bureau of Reclamation, Interior. ACTION: Notice. SUMMARY... CONTACT: Michelle Kelly, Water and Environmental Services Division, Bureau of Reclamation, P.O. Box 25007...

  1. 76 FR 60527 - Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Science.gov (United States)

    2011-09-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Status Report of Water Service, Repayment, and Other Water- Related Contract Actions AGENCY: Bureau of Reclamation, Interior. ACTION: Notice. SUMMARY... CONTACT: Michelle Kelly, Water and Environmental Resources Division, Bureau of Reclamation, P.O. Box 25007...

  2. Contracting Data Analysis: Assessment of Government-Wide Trends

    Science.gov (United States)

    2017-03-01

    CONTRACTING DATA ANALYSIS Assessment of Government -wide Trends Report to Congressional Addressees March 2017...Office Highlights of GAO-17-244SP, a report to congressional addressees March 2017 CONTRACTING DATA ANALYSIS Assessment of Government -wide...Trends What GAO Found GAO’s analysis of government -wide contracting data found that while defense obligations to buy products and services

  3. Prototypical Consolidation Demonstration Project: Final report

    International Nuclear Information System (INIS)

    Gili, J.A.; Poston, V.K.

    1993-11-01

    This is the final report of the Prototypical Consolidation Demonstration Project, which was funded by the US Department of Energy's Office of Civilian Radioactive Waste Management. The project had two objectives: (a) to develop and demonstrate a prototype of production-scale equipment for the dry, horizontal consolidation and packaging of spent nuclear fuel rods from commercial boiling water reactor and pressurized water reactor fuel assemblies, and (b) to report the development and demonstration results to the US Department of Energy, Idaho Operations Office. This report summarizes the activities and conclusions of the project management contractor, EG ampersand G Idaho, Inc., and the fabrication and testing contractor, NUS Corporation (NUS). The report also presents EG ampersand G Idaho's assessments of the equipment and procedures developed by NUS

  4. 48 CFR 242.302 - Contract administration functions.

    Science.gov (United States)

    2010-10-01

    ...) Contractor estimating systems (see FAR 15.407-5); and (B) Contractor material management and accounting... report identifying significant accounting system or related internal control deficiencies. (9) For... SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract...

  5. Thermophotovoltaic (TPV) technology development. Final report, May 15, 1995--December 1, 1995

    International Nuclear Information System (INIS)

    1995-01-01

    This program information release (PIR) summarizes work performed under Task Order Contract SF17787, Task Order 18: Thermophotovoltaic Technology Development, sponsored by the U.S. Department of Energy. The period of performance was 15 May 1995 to 1 December 1995. Under this task order, a system model for a thermophotovoltaic (MV) converter was implemented and used to compare a conceptual design for an advanced quaternary III-V cell with integral filter with results previously published for a binary GaSb cell with a freestanding filter. Model results were used to assess the merits of TPV conversion for meeting various levels of space power requirements, including low to medium power isotope applications and high-power reactor applications. A TPV cell development program was initiated to determine the feasibility of fabricating quaternary III-V cells by molecular beam epitaxy. Lastly, a conceptual design was completed for a low-cost demonstration system to test the performance of TPV converters at a multi-cell, sub-system level. The results of these efforts are reported briefly in an executive summary, then in somewhat more detail as a final briefing section in which charts have been reproduced. Additional technical detail is provided in the appendices

  6. Report of the advisory committee on the management and disposition of Ontario Hydro's contracts with non-utility generators

    International Nuclear Information System (INIS)

    Anon.

    1999-01-01

    The report from the advisory committee on the management and disposition of Ontario Hydro's contracts with non-utility generators on the future management and disposition of the power purchase agreements entered into by Ontario Hydro with each non-utility generator (a NUG) is discussed. The integration of NUG contracts into a restructured competitive electricity market, the complexity of the contracts and the disparity of size, resources and approach to the integration exercise of the NUGs produces to an array of challenging issues. The committee identified three alternative strategies for dealing with NUG contracts in Ontario. The first is to use the independent Electricity Market Operator as a purely passive contract holder and above-market cost collection agent. The second is to make the Ontario Electricity Financial Corporation (OEFC) the contract holder and use a commercially oriented manager to administer the NUG contracts. This would minimize above-market costs and to advise on buyouts, compute above-market costs as an amount based on the difference between estimated future contract payments and estimated future market revenues for NUG power and recover them from domestic customers as a part of a single pooled Competition Transfer Charge. The third is to make the OEFC the contract holder, use a commercially oriented manager to administer the NUG contracts, to minimize above-market costs and to advise on buyouts. The OEFC would compute above-market costs as an amount based on the difference between estimated future contract payments and estimated future market revenues for NUG power and recover them from domestic customers as a part of a pooled CTC. The IMO would be used to collect the above-market NUG contract part of the pooled CTC as agent of the contract holder, in a contract uplift that would, like the levy in the first strategy, be charged to wholesale market participants and be included in rates paid by domestic end-use customers.1

  7. FutureGen 2.0 Oxy-combustion Large Scale Test – Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Kenison, LaVesta [URS, Pittsburgh, PA (United States); Flanigan, Thomas [URS, Pittsburgh, PA (United States); Hagerty, Gregg [URS, Pittsburgh, PA (United States); Gorrie, James [Air Liquide, Kennesaw, GA (United States); Leclerc, Mathieu [Air Liquide, Kennesaw, GA (United States); Lockwood, Frederick [Air Liquide, Kennesaw, GA (United States); Falla, Lyle [Babcock & Wilcox and Burns McDonnell, Kansas City, MO (United States); Macinnis, Jim [Babcock & Wilcox and Burns McDonnell, Kansas City, MO (United States); Fedak, Mathew [Babcock & Wilcox and Burns McDonnell, Kansas City, MO (United States); Yakle, Jeff [Babcock & Wilcox and Burns McDonnell, Kansas City, MO (United States); Williford, Mark [Futuregen Industrial Alliance, Inc., Morgan County, IL (United States); Wood, Paul [Futuregen Industrial Alliance, Inc., Morgan County, IL (United States)

    2016-04-01

    be helpful to plotting the course of, and successfully executing future large demonstration projects. This Final Scientific and Technical Report describes the technology and engineering basis of the project, inclusive of process systems, performance, effluents and emissions, and controls. Further, the project cost estimate, schedule, and permitting requirements are presented, along with a project risk and opportunity assessment. Lessons-learned related to these elements are summarized in this report. Companion reports Oxy-combustion further document the accomplishments and learnings of the project, including: A.01 Project Management Report which describes what was done to coordinate the various participants, and to track their performance with regard to schedule and budget B.02 Lessons Learned - Technology Integration, Value Improvements, and Program Management, which describes the innovations and conclusions that we arrived upon during the development of the project, and makes recommendations for improvement of future projects of a similar nature . B.03 Project Economics, which details the capital and operation costs and their basis, and also illustrates the cost of power produced by the plant with certain sensitivities. B.04 Power Plant, Pipeline, and Injection Site Interfaces, which details the interfaces between the two FutureGen projects B.05 Contractual Mechanisms for Design, Construction, and Operation, which describes the major EPC, and Operations Contracts required to execute the project.

  8. X-ray fluorescence analysis study. Final report, December 1, 1970-December 31, 1977

    Energy Technology Data Exchange (ETDEWEB)

    Kneip, T J; Laurer, G R

    1978-01-01

    This report has described the most significant experiments and the results obtained, during the development of a system for the detection and measurement of Pb in blood using radioisotope-excited x-ray fluorescence analysis, over the contract period. Briefly, the report described: detector selection; source selection; source-sample-detector geometry; sample preparation; system calibration; and separation technique. (PSB)

  9. Contract management survey 2002.

    Science.gov (United States)

    Hoppszallern, Suzanna

    2002-10-01

    Spending on clinical contracts continues to outpace spending on business services, but may be leveling off. The 12th annual Contract Management Survey shows that the performance of clinical vendors is now comparable to business service vendors in meeting savings targets. Both business and clinical vendors are receiving higher marks from hospital leaders, but execs quickly respond to low marks by bringing the service back in-house of changing vendors. This report examines trends in outsourcing, satisfaction levels, the decision-making process, contract features and performance, and spending.

  10. Contract theory and EU Contract Law

    OpenAIRE

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories are largely irreconcilable with the contract law of the EU. The paper further addresses the main implications of this mismatch, both for contract theory and for EU contract law. It suggests that in...

  11. PSI-Center Final Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Jarboe, Thomas R. [Univ. of Washington, Seattle, WA (United States); Shumlak, Uri [Univ. of Washington, Seattle, WA (United States); Sovinec, Carl [Univ. of Washington, Seattle, WA (United States); Hansen, Chris [Univ. of Washington, Seattle, WA (United States); Ji, Jeong-Young [Utah State Univ., Logan, UT (United States); Nelson, Brian [Univ. of Wisconsin, Madison, WI (United States)

    2017-04-20

    This is the Final Progress Report of the Plasma Science and Innovation Center (PSI-Center) covering March 2014 through February 2017. The Center has accomplished a great deal during this period. The PSI-Center is organized into four groups: Edge and Dynamic Neutrals; Transport and Kinetic Effects; Equilibrium, Stability, and Kinetic Effects in 3D Topologies; and Interface for Validation. Each group has made good progress and the results from each group are given in detail.

  12. Characterization of HLW glass samples Task 3 Characterization of radioactive waste forms a series of final reports (1985-89) No 20

    International Nuclear Information System (INIS)

    Malow, G.; Behrend, U.; Schubert, P.

    1991-01-01

    Due to a delay in the melting of the highly radioactive SON68 glass, a short-term post-investigation of the highly radioactive glass from the Pamela plant in Mol (Belgium) has been carried out, the aim being a check-up of the active LEWC glass SM 513 LW11. The results were compared with those obtained for non-radioactive glass samples. The final report of the present CEC programme shortly describes the planned investigations of the glass R7T7 for the whole period of the research contract and the results of the short-term post-investigation of the Pamela glass. 11 refs.; 9 figs.; 4 tabs

  13. 48 CFR 9903.201-4 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... consistently the Contractor's cost accounting practices in accumulating and reporting contract performance cost... contract performance cost data concerning this contract. If any change in cost accounting practices is made...-4 Section 9903.201-4 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE...

  14. Northeastern Regional Geologic Characterization Report: executive summary. Final report

    International Nuclear Information System (INIS)

    1985-08-01

    This Executive Summary of the final Northeastern Regional Geologic Characterization Report (RGCR) is issued primarily for public information purposes and provides a general overview of the report. The complete RGCR presents available regional geologic information pertinent to siting a repository for high-level nuclear waste in crystalline rock in Connecticut, Maine, Massachusetts, New Hampshire, New Jersey, New York, Pennsylvania, Rhode Island, and Vermont. For each of the states within the Northeastern Region, information is provided on the geologic disqualifying factor and the geologic regional screening variables to be used in region-to-area screening. 5 refs., 3 figs

  15. MIT LMFBR blanket research project. Final summary report

    International Nuclear Information System (INIS)

    Driscoll, M.J.

    1983-08-01

    This is a final summary report on an experimental and analytical program for the investigation of LMFBR blanket characteristics carried out at MIT in the period 1969 to 1983. During this span of time, work was carried out on a wide range of subtasks, ranging from neutronic and photonic measurements in mockups of blankets using the Blanket Test Facility at the MIT Research Reactor, to analytic/numerical investigations of blanket design and economics. The main function of this report is to serve as a resource document which will permit ready reference to the more detailed topical reports and theses issued over the years on the various aspects of project activities. In addition, one aspect of work completed during the final year of the project, on doubly-heterogeneous blanket configurations, is documented for the record

  16. 78 FR 80369 - Federal Acquisition Regulation; Service Contracts Reporting Requirements

    Science.gov (United States)

    2013-12-31

    ... (e.g., cost-reimbursement, time-and- materials, and labor-hour contracts), which already require... contract costs and labor can significantly fluctuate each year or how this type of labor can be comingled... of direct labor hours expended on the services performed is extremely concerning, particularly in a...

  17. Medicare program; offset of Medicare payments to individuals to collect past-due obligations arising from breach of scholarship and loan contracts--HCFA. Final rule.

    Science.gov (United States)

    1992-05-04

    This final rule sets forth the procedures to be followed for collection of past-due amounts owed by individuals who breached contracts under certain scholarship and loan programs. The programs that would be affected are the National Health Service Corps Scholarship, the Physician Shortage Area Scholarship, and the Health Education Assistance Loan. These procedures would apply to those individuals who breached contracts under the scholarship and loan programs and who-- Accept Medicare assignment for services; Are employed by or affiliated with a provider, Health Maintenance Organization, or Competitive Medical Plan that receives Medicare payment for services; or Are members of a group practice that receives Medicare payment for services. This regulation implements section 1892 of the Social Security Act, as added by section 4052 of the Omnibus Budget Reconciliation Act of 1987.

  18. Navy radon assessment and mitigation program: Final report

    International Nuclear Information System (INIS)

    1994-10-01

    This final report encompasses the events from the beginning of the Navy Radon Assessment and Mitigation Program to the closure of the program on October 31, 1994. Included in the report are discussions of the phases of the program including screening, assessment, mitigation, and post-mitigation. The primary discussion involves screening and assessment. The report addresses recommendations made to the Naval Facilities Engineering Command by the Hazardous Waste Remedial Actions Program of Martin Marietta Energy Systems, Inc., and the final decisions that were made. Special emphasis is placed on quality assurance/quality control (QA/QC), since QA/QC was given top priority during the implementation of this program. Included in the discussion on QA/QC are ana overview of the measurement process, positive and negative controls, replicated measurements, and application of chamber exposures to data calibration. The report concludes with a discussion of testing considerations for naval facilities and radon mitigation considerations for the Department of the Navy

  19. IRIS Toxicological Review of Chloroform (Final Report)

    Science.gov (United States)

    EPA is announcing the release of the final report, Toxicological Review of Chloroform: in support of the Integrated Risk Information System (IRIS). The updated Summary for Chloroform and accompanying Quickview have also been added to the IRIS Database.

  20. TADS Final Evaluation Report, 1980-81. Appendix S.

    Science.gov (United States)

    Suarez, Tanya M.; And Others

    The document contains the final report of the Technical Assistance Development System (TADS), a program which provided technical assistance (TA) services to 53 Handicapped Children's Early Education Program (HCEEP) demonstration projects and 13 State Implementation Grants (SIGs). The evaluation report is divided into five sections. Section 1…

  1. Regulatory Project Manager for Salina and Permian Basins for the NWTS [National Waste Terminal Storage] Program: Final techical report

    International Nuclear Information System (INIS)

    1986-12-01

    The identification of candidate sites for nuclear waste repositories involves geological and environmental studies to characterize potential sites. These investigations include the collection and analysis of detailed geological and environmental data and comparison of the data against predetermined site performance criteria, i.e., geologic characteristics, environmental protection, and socioeconomic impacts. The work summarized in this final technical report encompasses mainly ''environmental characterization'' studies in the Permian Basin in the Texas Panhandle during the period of 1977-86; in the earlier phase of the contract, regional environmental work was also done in the Salina Basin (1977-79) and certain licensing support activities and safety analyses were conducted (1977-82). Considerable regulatory support work was also performed during 1986. 9 figs., 2 tabs

  2. 2001 contract management survey.

    Science.gov (United States)

    2001-10-01

    For the second year running, hospitals are spending more on clinical outsourcing than on business services. The Eleventh Annual Contract Services Survey shows that, in clinical areas, executives use outsourcing to acquire specialized expertise with cost savings secondary. Reducing costs and FTEs are the primary reasons for outsourcing business operations. Business service contracts are more likely to meet expectations for cost savings. Overall, satisfaction levels are up, but in some areas there's still a lot of room for improvement. This report examines current trends in outsourcing, strategies for the future, satisfaction levels, the decisionmaking process, contract features, and costs.

  3. High-Efficiency Nitride-Based Solid-State Lighting. Final Technical Progress Report

    International Nuclear Information System (INIS)

    Paul T. Fini; Shuji Nakamura

    2005-01-01

    In this final technical progress report we summarize research accomplished during Department of Energy contract DE-FC26-01NT41203, entitled ''High-Efficiency Nitride-Based Solid-State Lighting''. Two teams, from the University of California at Santa Barbara (Principle Investigator: Dr. Shuji Nakamura) and the Lighting Research Center at Rensselaer Polytechnic Institute (led by Dr. N. Narendran), pursued the goals of this contract from thin film growth, characterization, and packaging/luminaire design standpoints. The UCSB team initially pursued the development of blue gallium nitride (GaN)-based vertical-cavity surface-emitting lasers, as well as ultraviolet GaN-based light emitting diodes (LEDs). In Year 2, the emphasis shifted to resonant-cavity light emitting diodes, also known as micro-cavity LEDs when extremely thin device cavities are fabricated. These devices have very directional emission and higher light extraction efficiency than conventional LEDs. Via the optimization of thin-film growth and refinement of device processing, we decreased the total cavity thickness to less than 1 (micro)m, such that micro-cavity effects were clearly observed and a light extraction efficiency of over 10% was reached. We also began the development of photonic crystals for increased light extraction, in particular for so-called ''guided modes'' which would otherwise propagate laterally in the device and be re-absorbed. Finally, we pursued the growth of smooth, high-quality nonpolar a-plane and m-plane GaN films, as well as blue light emitting diodes on these novel films. Initial nonpolar LEDs showed the expected behavior of negligible peak wavelength shift with increasing drive current. M-plane LEDs in particular show promise, as unpackaged devices had unsaturated optical output power of ∼ 3 mW at 200 mA drive current. The LRC's tasks were aimed at developing the subcomponents necessary for packaging UCSB's light emitting diodes, and packaging them to produce a white light

  4. Contract theory and EU Contract Law

    NARCIS (Netherlands)

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories

  5. Final Report of the Advanced Coal Technology Work Group

    Science.gov (United States)

    The Advanced Coal Technology workgroup reported to the Clean Air Act Advisory Committee. This page includes the final report of the Advanced Coal Technology Work Group to the Clean Air Act Advisory Committee.

  6. Semiannual report to Congress on Inspector General audit reports, April 1--September 30, 1994

    International Nuclear Information System (INIS)

    1994-11-01

    This is the Secretary of Energy's eleventh Semiannual Report to Congress submitted under the Inspector General Act of 1978, as amended. Pursuant to the Inspector General Act Amendments of 1988 (Public Law 100-504), agency heads are to report to Congress on the status of final action taken on audit report recommendations. This report complements a report prepared by the Department's Office of Inspector General that provides information on audit reports issued during the period and on the status of management decisions made on Inspector General audit reports. During the period covered by this report, April 1, through September 30, 1994, the Department took final action on 40 operational, financial, and preaward audit reports. At the end of the period 77 reports awaited final action. No final action was taken on contract and financial assistance audits, leaving six reports requiring final action at the end of the period. This report has three sections. The first outlines significant audit resolution and followup accomplishment achieved by the Department during the reporting period. The second section contains the statistical tables that illustrate the status of final action on Inspector General audit reports. The third lists the audit reports that are one year or more past management decision and have not completed final action. This section also provides the status of corrective actions on each of these reports

  7. Semiannual report to Congress on Inspector General audit reports: April 1--September 30, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    This is the Secretary of Energy`s seventeenth Semiannual Report to Congress submitted under the Inspector General Act of 1978, as amended. Pursuant to the Inspector General Act Amendments of 1988 (Public Law 100-504), agency heads are to report to Congress on the status of final action taken on audit report recommendations. This report complements a report prepared by the Department`s Office of Inspector General that provides information on audit reports issued during the period and on the status of management decisions made on Inspector General audit reports. During the period covered by this report, April 1 through September 30, 1997, the Department took final action on 29 operational, financial, and preaward audit reports. At the end of the period 72 reports awaited final action. Final action was taken on five contract and financial assistance audits, leaving two reports requiring final action at the end of the period. This report has three sections. The first section outlines significant audit resolution and followup accomplishments achieved by the Department during the reporting period. The second section contains the statistical tables that illustrate the status of final action on Inspector General audit reports. The third lists the audit reports that are one year or more past management decision and have not completed final action. This section also provides the status of corrective actions on each of those reports.

  8. Final technical report: DOE-High Energy Physics contract with the University of Hawaii

    International Nuclear Information System (INIS)

    1995-01-01

    This report is divided into two sections: (1) experimental program; and (2) theoretical program. In each case the report includes a highly condensed summary of the major developments on various Hawaii projects. The various experimental programs in which Hawaii played a significant role during this period are: (1) neutrino bubble chamber experiments; (2) electron-positron colliding beams; (3) development of silicon particle-position detectors for HEP; (4) proton decay search; (5) high energy gamma-ray astronomy; and (6) DUMAND project. The theoretical programs are: (1) research in neutrino physics; (2) supernova neutrinos; (3) solar neutrinos; (4) atmospheric neutrinos; (5) searching for supersymmetry; (6) Higgs boson searches; (7) simulation of supersymmetry; (8) signals of R-parity violation; (9) leptoquarks, stable heavy particles and other exotica; (10) CP non conservation; (11) neutron electron dipole moment; (12) heavy quark physics; and (13) hadron spectroscopy

  9. Claims in civil engineering contracts

    CERN Document Server

    Speirs, N A

    1999-01-01

    This paper considers claims arising during civil engineering construction contracts. The meaning of the word 'claim' is considered and its possible implications for additional cost and time to completion. The conditions of the construction contract selected will influence the risk apportionment between contractor and client and the price offered by the contractor for the work. Competitive bidding constraints and profit margins in the construction industry, however, may also influence the price offered. This in turn can influence the likelihood of claims arising. The client from his point of view is concerned to complete the work within an agreed time and budget. The circumstances under which claims may arise are reviewed in relation to typical conditions of contract. These circumstances are then related to the CERN LHC civil works. Ways of avoiding claims, where this is possible, are considered. Finally, the means of evaluation of claims and their settlement are considered.

  10. Final report of the ITER EDA. Final report of the ITER Engineering Design Activities. Prepared by the ITER Council

    International Nuclear Information System (INIS)

    2001-01-01

    This is the Final Report by the ITER Council on work carried out by ITER participating countries on cooperation in the Engineering Design Activities (EDA) for the ITER. In this report the main ITER EDA technical objectives, the scope of ITER EDA, its organization and resources, engineering design of ITER tokamak and its main parameters are presented. This Report also includes safety and environmental assessments, site requirements and proposed schedule and estimates of manpower and cost as well as proposals on approaches to joint implementation of the project

  11. The Research Contract Programme annual report and statistics for 2000

    International Nuclear Information System (INIS)

    2001-06-01

    53 Coordinated Research Projects (CRPs) were completed in 2000. 38 of these CRPs concerned topics in Nuclear Sciences and Applications and 15 were related to nuclear energy and safety. These CRPs were funded for $9,275,648; the average annual cost per CRP was $38,892. A list of these CRPs is included. Evaluations of these CRPs will be completed by the end of 2001 and included in the next annual report. The Agency's unique position as a technical international organization has enabled it to act as an international platform to lead groups of nuclear scientists by co-ordinating research and developmental activities addressing important problems in Member States. CRPs have been used to transfer existing technologies to developing countries, as well as for the development of new technologies in those countries. Since CRPs are tailored to finding solutions to specific problems, as compared to general techniques, their potential value in terms of the effect on Member States' level of development is substantial. In an effort to further enhance the effectiveness of CRPs developed and coordinated by the Agency, various initiatives have been suggested and the Research Contract Programme has been the subject of several advisory fora. The PPAS of Major Programme 2, the Senior Evaluation Group (SEG), and an internal audit of the programme have recently made recommendations to this end. Based on these reviews, the Agency has begun to fund fewer, but better focused and more substantially funded CRPs. Whereas in 1999, the Agency was carrying out 159 CRPs, 132 CRPs were carried out in 2000. The average annual amount of funding available per CRP during this period increased by 14%, from US $47,500 in 1999 to US $ 54,000 in 2000. In addition, the introduction of a new type of CRP (called Thematic CRP), meant to complement traditional CRPs, is currently being tested by the Human Health programme. This new, optional type of CRP is designed to strengthen promotion of research on nuclear

  12. The Research Contract Programme annual report and statistics for 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-06-15

    53 Coordinated Research Projects (CRPs) were completed in 2000. 38 of these CRPs concerned topics in Nuclear Sciences and Applications and 15 were related to nuclear energy and safety. These CRPs were funded for $9,275,648; the average annual cost per CRP was $38,892. A list of these CRPs is included. Evaluations of these CRPs will be completed by the end of 2001 and included in the next annual report. The Agency's unique position as a technical international organization has enabled it to act as an international platform to lead groups of nuclear scientists by co-ordinating research and developmental activities addressing important problems in Member States. CRPs have been used to transfer existing technologies to developing countries, as well as for the development of new technologies in those countries. Since CRPs are tailored to finding solutions to specific problems, as compared to general techniques, their potential value in terms of the effect on Member States' level of development is substantial. In an effort to further enhance the effectiveness of CRPs developed and coordinated by the Agency, various initiatives have been suggested and the Research Contract Programme has been the subject of several advisory fora. The PPAS of Major Programme 2, the Senior Evaluation Group (SEG), and an internal audit of the programme have recently made recommendations to this end. Based on these reviews, the Agency has begun to fund fewer, but better focused and more substantially funded CRPs. Whereas in 1999, the Agency was carrying out 159 CRPs, 132 CRPs were carried out in 2000. The average annual amount of funding available per CRP during this period increased by 14%, from US $47,500 in 1999 to US $ 54,000 in 2000. In addition, the introduction of a new type of CRP (called Thematic CRP), meant to complement traditional CRPs, is currently being tested by the Human Health programme. This new, optional type of CRP is designed to strengthen promotion of research on nuclear

  13. Summary of the ITER final design report. July 2001

    International Nuclear Information System (INIS)

    2001-01-01

    This document is a summary of the ITER final design report foreseen during the current, Engineering Design Activities (EDA), phase of the ITER project. The report presents the results of collaborative design and supporting technical work undertaken by the ITER Joint Central team (JCT) and the Home Teams (HT) of the parties to the agreement on co-operation in the Engineering Design Activities for ITER (the ITER EDA Agreement). This report marks the achievement of the full technical scope of activities indicated in the ITER EDA Agreement, with a final design which meets the programmatic objective defined in the Agreement and satisfies detailed scientific, technical and costing objectives set by ITER Council in 1998

  14. Mixed waste landfill monitoring prototype test design for Los Alamos National Laboratory. Final report

    International Nuclear Information System (INIS)

    Keller, C.

    1994-09-01

    The purpose of this contract is to design the prototype tests necessary for the verification of the measurement methods proposed for the Mixed Waste Disposal Facility. The design is limited to the hydrological performance of the measurement methods. It does not include the mechanical testing of the methods proposed. The test site is to be selected and when approved, construction drawings provided. The contract also includes testing of vitrified clay pipe as the liner of choice for the passages under the landfill. The tests are to be done of both he hydrologic and the mechanical capability of the pipe. The test bed construction is to be supervised as it is being done by the construction contractor monitored by LANL. This contract does not include the logical subsequent work of performance of the measurements in the test bed. Since this contract was received by September 15, with the work to be completed by September 30, only that work possible in the short time was performed. That included the design of the test bed, the purchase of the vitrified clay pipe and the mechanical tests of the pipe, and the purchase of the SEAMIST systems for testing in the clay pipe. None of those could be delivered in time for flow tests to be done on the clay pipe. The mechanical tests were done as part of the pipe purchase and are reported here. The contract was not extended beyond September 30 for lack of funds. This report is therefore limited to the preliminary design of the test bed and to the specification of the orders for the materials. The hope is that funding will be restored to the program for the completion of the design and measurement effort

  15. A decade of DIII-D research. Final report for the period of work, October 1, 1989--September 30, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    During the ten-year DIII-D tokamak operating period of 1989 through 1998, major scientific advances and discoveries were made and facility upgrades and improvements were implemented. Each year, annual reports as well as journal and international conference proceedings document the year-by-year advances (summarized in Section 7). This final contract report, provides a summary of these historical accomplishments. Section 2 encapsulates the 1998 status of DIII-D Fusion Science research. Section 3 summarizes the DIII-D facility operations. Section 4 describes the major upgrades to the DIII-D facility during this period. During the ten-year period, DIII-D has grown from predominantly a General Atomics program to a national center for fusion science with participants from over 50 collaborating institutions and 300 users who spend more than one week annually at DIII-D to carry out experiments or data analysis. In varying degrees, these collaborators participate in formulating the research program directions. The major collaborating institution programs are described in Section 6.

  16. A decade of DIII-D research. Final report for the period of work, October 1, 1989--September 30, 1998

    International Nuclear Information System (INIS)

    1999-03-01

    During the ten-year DIII-D tokamak operating period of 1989 through 1998, major scientific advances and discoveries were made and facility upgrades and improvements were implemented. Each year, annual reports as well as journal and international conference proceedings document the year-by-year advances (summarized in Section 7). This final contract report, provides a summary of these historical accomplishments. Section 2 encapsulates the 1998 status of DIII-D Fusion Science research. Section 3 summarizes the DIII-D facility operations. Section 4 describes the major upgrades to the DIII-D facility during this period. During the ten-year period, DIII-D has grown from predominantly a General Atomics program to a national center for fusion science with participants from over 50 collaborating institutions and 300 users who spend more than one week annually at DIII-D to carry out experiments or data analysis. In varying degrees, these collaborators participate in formulating the research program directions. The major collaborating institution programs are described in Section 6

  17. North Central Regional Geologic Characterization Report. Executive summary. Final report

    International Nuclear Information System (INIS)

    1985-08-01

    This Executive Summary of the final North Central Regional Geologic Characterization Report (RGCR) is issued primarily for public information purposes and provides a general overview of the report. The complete RGCR presents available regional geologic information pertinent to siting a repository for high-level nuclear waste in crystalline rock in Minnesota, Wisconsin, and the Upper Peninsula of Michigan. For each of the states within the North Central Region, information is provided on the geologic disqualifying factor and the geologic regional screening variables to be used in region-to-area screening

  18. Final report. CIRP seminar on micro and nano technology. November 2003

    DEFF Research Database (Denmark)

    Hansen, Hans Nørgaard; Alting, Leo

    This final reports contains a description of the 1st international CIRP seminar on micro and nano technology held at DTU in November 2003.......This final reports contains a description of the 1st international CIRP seminar on micro and nano technology held at DTU in November 2003....

  19. Final Report on the Research Project Ringhals Diagnostics and Monitoring. Stage 4

    International Nuclear Information System (INIS)

    Demaziere, C.; Arzhanov, V.; Karlsson, Joakim K.H.; Pazsit, I.

    1999-01-01

    This report gives an account of the work performed by the Department of Reactor Physics in the frame of a research contract with Ringhals, Vattenfall AB. The contract constitutes Stage 4 of a long-term co-operative research work concerning diagnostics and monitoring of the BWR and PWR units. The work in Stage 4 has been performed between 1 October 1998 and 1 September 1999. In Stage 4 we have worked with four items as follows: 1. Regional modes in R1 stability measurements; 2. Analysis of data from the measurement 980604; 3. Study of the possibility of measuring the moderator temperature coefficient using noise methods. Literature survey and measurement evaluation; 4. Transfer of the method for determining axial control rod elevation. Current situation and progress

  20. Semiannual report to Congress on Inspector General audit reports, October 1, 1996--March 31, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    This is the Secretary of Energy`s sixteenth Semiannual Report to Congress submitted under the Inspector General Act of 1978, as amended. Pursuant to the Inspector General Act Amendments of 1988 (Public law 100-504), agency heads are to report to Congress on the status of final action taken on audit report recommendations. This report complements a report prepared by the Department`s Office of Inspector General that provides information on audit reports issued during the period and on the status of management decisions made on Inspector General audit reports. During the period covered by this report, October 1, 1996, through March 31, 1997, the Department took final action on 31 operational, financial, and preaward audit reports. At the end of the period 74 reports awaited final action. Final action was taken on 11 contract and financial assistance audits, leaving no reports requiring final action at the end of the period. This report has three sections. The first section outlines significant audit resolution and followup accomplishments achieved by the Department during the reporting period. The second section contains the statistical tables that illustrate the status of final action on Inspector General audit reports. The third lists the audit reports that are one year or more past management decision and have not completed final action. This section also provides the status of corrective actions on each of those reports.

  1. Semiannual report to Congress on Inspector General audit reports, October 1, 1997--March 31, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    This is the Secretary of Energy`s eighteenth Semiannual Report to Congress submitted under the Inspector General Act of 1978, as amended. Pursuant to the Inspector General Act Amendments of 1988 (Public Law 100-504), agency heads are to report to Congress on the status of final action taken on audit report recommendations. This report complements a report prepared by the Department`s Office of Inspector General that provides information on audit reports issued during the period and on the status of management decisions made on Inspector General audit reports. During the period covered by this report, October 1, 1997, through March 31, 1998, the Department took final action on 20 operational, financial, and preaward audit reports. At the end of the period 80 reports awaited final action. Final action was taken on one contract and financial assistance audit, leaving two reports requiring final action at the end of the period. This report has three sections. The first section outlines significant audit resolution and followup accomplishments achieved by the Department during the reporting period. The second section contains the statistical tables that illustrate the status of final action on Inspector General audit reports. The third lists the audit reports that are one year or more past management decision and have not completed final action. This section also provides the status of corrective actions on each of those reports.

  2. Semiannual report to Congress on Inspector General audit reports, April 1, 1995--September 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This is the Secretary of Energy`s thirteenth Semiannual Report to Congress submitted under the Inspector General Act of 1978, as amended. Pursuant to the Inspector General Act Amendments of 1988 (Public Law 100-504), agency heads are to report to Congress on the status of final action taken on audit report recommendations. This report complements a report prepared by the Department`s Office of Inspector General that provides information on audit reports issued during the period and on the status of management decisions made on Inspector General audit reports. During the period covered by this report, April 1, 1995, through September 30, 1995, the Department took final action on 33 operational, financial, and preaward audit reports. At the end of the period 96 reports awaited final action. Final action was taken on 2 contract and financial assistance audits, leaving 2 reports requiring final action at the end of the period. This report has three sections. The first section outlines significant audit resolution and followup accomplishments achieved by the Department during the reporting period. The second section contains the statistical tables that illustrate the status of final action on Inspector General audit reports. The third lists the audit reports that are one year or more past management decision and have not completed final action. This section also provides the status of corrective actions on each of these reports.

  3. Army Contract Writing System (ACWS)

    Science.gov (United States)

    2016-03-01

    2016 Major Automated Information System Annual Report Army Contract Writing System (ACWS) Defense Acquisition Management Information Retrieval...Information 4 Responsible Office 4 References 4 Program Description 5 Business Case 5 Program Status 6 Schedule 7 Performance...Program Information Program Name Army Contract Writing System (ACWS) DoD Component Army Responsible Office Program Manager References MAIS

  4. Report: Policies Needed for Proper Use and Management of Cost-Reimbursement Contracts Based on Duncan Hunter Act

    Science.gov (United States)

    Report #12-P-0320, March 6, 2012. EPA did not comply with several key revisions to the FAR as amended by the interim rule, Proper Use and Management of Cost Reimbursement Contracts (FAR Case 2008-030).

  5. Phase I Final Scientific Report

    Energy Technology Data Exchange (ETDEWEB)

    Lu, Xijia [National Energy Technology Lab. (NETL), Albany, OR (United States); Fetvedt, Jeremy [National Energy Technology Lab. (NETL), Albany, OR (United States); Dimmig, Walker [National Energy Technology Lab. (NETL), Albany, OR (United States)

    2017-10-15

    This Final Scientific Report addresses the accomplishments achieved during Phase I of DE- FE0023985, Coal Syngas Combustor Development for Supercritical CO2 Power Cycles. The primary objective of the project was to develop a coal syngas-fueled combustor design for use with high-pressure, high-temperature, oxy-fuel, supercritical CO2 power cycles, with particular focus given to the conditions required by the Allam Cycle. The primary goals, from the Statement of Project Objectives, were to develop: (1) a conceptual design of a syngas-fueled combustor-turbine block for a 300MWe high-pressure, oxy-fuel, sCO2 power plant; (2) the preliminary design of a 5MWt test combustor; and (3) the definition of a combustor test program. Accomplishments for each of these goals are discussed in this report.

  6. Regional Coordination and Analysis of OCRWM Transportation Program: Fourth Quarter and Final Report, January 15, 1998 - April 14, 1998

    International Nuclear Information System (INIS)

    Western Interstate Energy Board

    1998-01-01

    This is the fourth quarter report on the activities of the High-Level Radioactive Waste Committee of the Western Interstate Energy Board. Together with the first three quarterly reports, this constitutes a final report. Over the course of the year, work under this contract has focused on: 1. Efforts to improved the Department's proposal to implement Section 180(c) of the Nuclear Waste Policy Act. (DOE has since suspended its efforts to implement this provision of the law.); 2. Advice to DOB on ways to conduct effective analysis of mode and routing options for spent fuel and high-level waste shipments under the Nuclear Waste Policy Act. (DOE has since suspended efforts to develop an effective mode and route selection process); 3. Advice to DOE on needed improvements in OCRWM's privatization initiative.; 4. Monitoring spent fuel and HLW developments that affect western state interests.; 5. Participating in DOE forums such as the Transportation External Coordination Working Group.; 6. Offering comments on documents related to NWPA transportation (e.g., the Navy's DELS for a container system for the management of spent nuclear fuel, DOE's Transportation Cask Quick Facts, DOE's report to Congress on the Price-Anderson Act)

  7. Energy forecast. Final report; Energiudsigten. Slutrapport

    Energy Technology Data Exchange (ETDEWEB)

    2010-04-15

    A number of instruments, i.e. Internet, media campaigns, boxes displaying electricity prices (SEE1) and spot contract has been tested for households to shift their electricity consumption to times when prices are low. Of the implemented media campaigns, only the daily viewing of Energy forecast on TV had an impact. Consumers gained greater knowledge of electricity prices and electricity consumption loads, but only showed little interest in shifting electricity consumption. However, a measurable effect appeared at night with the group that had both concluded a spot contract and received an SEE1. These factors increase the awareness of the price of electricity and the possibility of shifting electricity consumption. (Energy 10)

  8. Types of contracts and contracting procedures

    International Nuclear Information System (INIS)

    Zijl, N.A. van

    1977-01-01

    Contracting for a nuclear power plant can be carried out in many different ways, from a bilateral agreement between two countries to an international open bidding competition. Also the kind of contracts (turnkey, split-package or multi-contract type) are discussed with their pros and cons as well as the contracting procedures which can be followed to come to the conclusion of a contract. (orig.) [de

  9. Advance of activities report of the contract CFE-PLV/166/90. Second four-monthly

    International Nuclear Information System (INIS)

    Perusquia C, R.; Alonso V, G.; Hernandez M, J.L.; Montes T, J.L.

    1992-09-01

    In this report a relationship of finished activities of the Global Program of Fuel Management inside the reactor carried out by the ININ under the contract ININ/CFE 1990-1991 (CFE-PLV/166/90) is presented. Those areas of activities are: 1. Nuclear Data Bank area. 2. Static Simulation of the Reactor area. 3. Reload Optimization area. 4. Analysis of Transitory Events of the Reactor area. (Author)

  10. Biofuels and the Environment: the First Triennial Report to Congress (2011 Final Report)

    Science.gov (United States)

    EPA announced the release of the final report,Biofuels and the Environment: The First Triennial Report to Congress (EPA/600/R-10/183F), prepared by the National Center for Environmental Assessment (NCEA) within EPA’s Office of Research and Development, as the first EPA rep...

  11. Contracting in vivo research: what are the issues?

    Science.gov (United States)

    Underwood, Wendy J

    2007-07-01

    As a result of increasing internal and external pressures, research institutions are using contract research organizations for the conduct of in vivo research. Many issues arise when contracting animal research, including concern regarding animal health and welfare. Each sponsor institution should develop a program for outsourced in vivo research that evaluates and ensures appropriate care and use of research animals. Each sponsoring institution should consider establishing a policy and procedure for how outsourced in vivo studies will be approved, conducted, and monitored. An approved list of contract facilities can be established on the basis of accepted standards for animal care and use. Written contracts should include confidentiality agreements, the delineation of animal ownership, and the expectation to comply with all applicable regulations and guidelines for research animal care and use. Finally, a process for communication of adverse study or animal welfare events should be established. Thorough evaluation of contract organizations will help ensure appropriate research animal care and use.

  12. Contracts Take or Pay, for supply and transport of gas

    International Nuclear Information System (INIS)

    Velasquez Bermudez, Jesus Maria

    2000-01-01

    The present article has as objective to study the effect that has the contract of supply and of transport of gas that subscribe generators agents of the electric sector with the agents of the market of the gas. The article concentrates on the study of the denominated contracts take or pay. Initially the modeling is analyzed to include the effect of the contracts of gas in the mathematical models that are used to support the works of planning. Later on is studied of optimal form to determining the prices in spot markets of the industries associated to the contracts. Finally is presented the methodology and controlled experiments that allow to identify and to quantify the macro economic effect of the contracts

  13. Bridge deck concrete volume change : final contract report.

    Science.gov (United States)

    2010-02-01

    Concrete structures such as bridge decks, with large surface area relative to volume, shrink and crack, thus reducing service life performance and increasing operation costs. The project evaluated the early, first 24 hours, and long-term, 180 days, s...

  14. Research into Flexibility Services. Final Report

    International Nuclear Information System (INIS)

    2005-03-01

    The Dutch Office for Energy Regulation (DTe) is currently investigating the Dutch gas flexibility market. DTe is concerned that Gasunie is dominant in the market. In order to take a view of Gasunie's market position, DTe needs to first define the market for gas flexibility services and then explore whether Gasunie is dominant in the market (or markets). DTe has commissioned Frontier to undertake the respective formal analysis. This report summarises the findings by Frontier. On the basis of this report and a formal consultation process, We follow a three-step approach to the study: (1) We first define the relevant markets for gas flexibility (Section 3); (2) We then analyse the structure of the markets for flexibility that we have defined (Section 4); (3) Finally, we assess whether Gasunie is dominant in the relevant markets, taking account of market shares and other competitive effects (Section 5). This document is the Final Report, which contains our views as to the market definition for gas flexibility and the position of Gasunie in the market. The remainder of this document is set out as follows: Section 2 provides an overview of aspects of the Dutch gas industry relevant to this study; Section 3 sets out our approach to defining the market and de-Mops our conclusions on the markets for gas flexibility; Section 4 provides our view as to the structure of the relevant flexibility markets as defined in Section 3; Section 5 reports our assessment as to whether Gasunie is dominant in the relevant markets, taking account of market shares and other competitive effects; Section 6 sets out our conclusions about the competitive assessment. We include three annexes that set out details related to the market definition and analysis of dominance

  15. Northeast Oregon Hatchery Project final siting report. Final report

    International Nuclear Information System (INIS)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed

  16. APRI - Accident Phenomena of Risk Importance. Final Report

    International Nuclear Information System (INIS)

    Frid, W.; Hammar, L.; Soederman, E.

    1996-12-01

    The APRI-project started in 1992 with participation of the Swedish Nuclear Power Inspectorate (SKI) and the Swedish utilities. The Finnish utility TVO joined the project in 1993. The aim of the project has been to work with phenomenological questions in severe accidents, concentrating on the risk-dominating issues. The work is reported in separate sub-project reports, the present is the final report of the methodological studies as well as a final report for the total project. The research has led to clarifications of the risk complex, and ameliorated the basis for advanced probabilistic safety analyses, specially for the emission risks (PSA level 2) which are being studied at the Swedish plants. A new method has been tried for analysis of complicated accident courses, giving a possibility for systematic evaluation of the impact of different important phenomena (e.g. melt-through, high pressure melt-through with direct heating of the containment atmosphere, steam explosions). In this method, the phenomena are looked upon as top events of a 'phenomena-tree', illustrating how various conditions must be met before the top-event can happen. This method has been useful, in particular for applying 'expert estimates'. 47 refs

  17. Final Report of the Final Meeting of Project Coordinators

    International Nuclear Information System (INIS)

    Cordero Calderon, Carlos F.

    1996-06-01

    The Costa Rican Electricity Institute has always been worried of the verification of the good state of the works and thus to guarantee their operation. For that reason, it has established different sorts of auscultation of the Arenal's Dam. Some investigations have been done to find new methods to improve and to eliminate risks in different works or projects. The Arenal's Dam is one of the greatest engineering works in Costa Rica, it has the Arenal, Corobici and Sandillal Hydroelectric Plants. Furthermore, the irrigation system in the Tempisque River Valley, in the Guanacaste province. One special characteristic of the Site of the Dam, is the near location of the Arenal Volcano, in full activity and located at 6 Km. from the dam. This report has two goals, one is the traditional permanent measurements report for the project, and the other, is to present it as a final work of the Project Arcal XVIII, to the International Atomic Energy Agency. This report analyses the geo-hydraulic, structural and topographic auscultation, as well as the activities accomplished during the ARCAL XVIII /8/018, Application of Tracer Techniques for Leakage in Dams and Damming Project, based on information gathered through the geo-chemical auscultation, until June 1996. (author).30 ills., 80 charts, 35 tabs

  18. Effect of radiation on proteins and radiation effects in biochemistry and organic chemistry. Final report, October 15, 1957--October 14, 1974

    International Nuclear Information System (INIS)

    Tolbert, B.M.

    1974-01-01

    A summary is made of a fifteen year study of chemical effects of radiation of amino acids and proteins. Included is a list of publications: 54 papers, reports and abstracts, and 10 M.S. and Ph.D theses. The report concludes with details of the final two studies done under this contract. These are, first, a study of post-irradiation effects of various gases on gamma irradiated lysozyme. This study showed that H 2 S, O 2 , NO, and N 2 O treatment changed the amount of aggregation products, and also that a certain amount of the irradiated lysozyme was subject to main chain cleavage. The second was a study of proteins in rabbit eye lens cataracts induced by x-irradiation or a high galactose diet. The cataract proteins were more soluble in water than normal proteins, and were present in lower amounts in the eye lens

  19. Waste acceptance criteria study: Volume 2, Appendixes: Final report

    International Nuclear Information System (INIS)

    Johnson, E.R.; McLeod, N.B.; McBride, J.A.

    1988-09-01

    These appendices to the report on Waste Acceptance Criteria have been published as a separate volume for the convenience of the reader. They consist of the text of the 10CFR961 Contract for disposal of spent fuel, estimates of the cost (savings) to the DOE system of accepting different forms of spent fuel, estimates of costs of acceptance testing/inspection of spent fuel, illustrative specifications and procedures, and the resolution of comments received on a preliminary draft of the report. These estimates of costs contained herein preliminary and are intended only to demonstrate the trends in costs, the order of magnitude involved, and the methodology used to develop the costs. The illustrative specifications and procedures included herein have been developed for the purpose of providing a starting point for the development of a consensus on such matters between utilities and DOE

  20. Operational Contract Support: Economic Impact Evaluation and Measures of Effectiveness

    Science.gov (United States)

    2017-12-01

    NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA MBA PROFESSIONAL REPORT OPERATIONAL CONTRACT SUPPORT: ECONOMIC IMPACT EVALUATION AND MEASURES...DATES COVERED MBA professional report 4. TITLE AND SUBTITLE OPERATIONAL CONTRACT SUPPORT: ECONOMIC IMPACT EVALUATION AND MEASURES OF EFFECTIVENESS 5...evaluation, expeditionary economics , operational contract support, measure of effectiveness 15. NUMBER OF PAGES 89 16. PRICE CODE 17. SECURITY

  1. A Guide to Performance Contracting. A Presentation and Discussion of the Multiple Considerations Regarding Contracted Services in Local Education Agencies.

    Science.gov (United States)

    Adams, John W.; Kitchak, Karen H.

    This report provides a framework for evaluating the use of performance contracts. It serves as a working guide for those who are considering or are committed to performance contracts with public or private organizations. The topics cover (1) the theoretical basis and rationale of performance contracting, (2) the procurement model and the request…

  2. Exploring the Psychological Contract of the Canadian Forces

    National Research Council Canada - National Science Library

    Nordick, Glenn

    1999-01-01

    .... The models of culture and expectation have then been used to examine possible areas of contract breach. Finally, recommendations are made on how to solidify the relationship between the CF and its members.

  3. 76 FR 43571 - Small Business HUBZone Program; Government Contracting Programs

    Science.gov (United States)

    2011-07-21

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 126 RIN 3245-AG45 Small Business HUBZone Program; Government Contracting Programs AGENCY: U.S. Small Business Administration. ACTION: Interim final rule with request for comments. SUMMARY: This interim final rule amends the U.S. Small Business Administration's...

  4. Gerena School Health Impact Assessment (HIA) Final Report

    Science.gov (United States)

    This is the final report of the EPA-led Gerena Community School HIA, which aims to provide valuable health-focused information to help the City of Springfield narrow down and prioritize renovation actions at the school.

  5. NCSU reactor sharing program. Final technical report

    International Nuclear Information System (INIS)

    Perez, P.B.

    1997-01-01

    The Nuclear Reactor Program at North Carolina State University provides the PULSTAR Research Reactor and associated facilities to eligible institutions with support, in part, from the Department of Energy Reactor Sharing Program. Participation in the NCSU Reactor Sharing Program continues to increase steadily with visitors ranging from advance high school physics and chemistry students to Ph.D. level research from neighboring universities. This report is the Final Technical Report for the DOE award reference number DE-FG05-95NE38136 which covers the period September 30, 1995 through September 30, 1996

  6. 76 FR 44884 - Federal Acquisition Regulation; Payments Under Time-and-Materials and Labor-Hour Contracts

    Science.gov (United States)

    2011-07-27

    ... under revised Alternate I. (b) Completion Voucher. The Allowable Cost and Payment, FAR clause 52.216-7.... * * * * * Payments Under Time-and-Material and Labor-Hour Contracts (Date) * * * * * (a) * * * (5) Vouchers may be... final payment under this contract, the Contracting Officer may request audit of the vouchers and...

  7. Contraction core for horn belief change: preliminary report

    CSIR Research Space (South Africa)

    Booth, R

    2010-05-01

    Full Text Available In this paper the authors continue recent investigations into belief change for Horn logic. The main contribution is a result which shows that the construction method for Horn contraction for belief sets based on infraremainder sets, as recently...

  8. RODOS User's Group: Final project report. Contract number: F14P- CT98-0075

    Energy Technology Data Exchange (ETDEWEB)

    Sinkko, K.; Ammann, M. (eds.)

    2001-03-01

    Prior to 1998, the development of RODOS, a decision support system designed for the management of nuclear emergencies, had been carried out almost entirely by research scientists and engineers. The end-users/operators had little or no input into this development. To redress this situation, the RODOS Users Group (RUG) was established in 1998 under a Concerted Action Contract between the European Commission and STUK. The main objectives of this group were to encourage the emergency management community to use such a system, to provide a forum for end-users to share their experience in the use of such systems and to provide feedback from the end-users to the model and system developers in regard to operational problems and required improvements. The contract, which commenced on 1st September 1998, was for a period of two years. During this period, RUG established a www homepage, planned and performed two nuclear accident exercises and held four meetings. Technically the Web page operated very well. State-of-the-art Internet technology provided an efficient communication channel at low cost. The membership of the RUG was, however, too low to maintain a lively and ongoing discussion in parallel with the RODOS project Web page. This experience would suggest that it might have been better to have operated a Web page for RUG on the RODOS project Web-site rather than an independent RUG Web-site. Exercises based on fixed accident scenarios proved to be an appropriate means of highlighting issues that needed to be discussed between users and developers and to stimulate and motivate the end-users to maintain and further develop the system. Such exercises also promoted further activity in the field of emergency management. The organisation and administration of realistic exercises are time consuming, laborious and expensive. It is therefore very important that the maximum benefit is achieved from such exercises. The use of analytical evaluation methods could be better employed

  9. Technology Pathway Partnership Final Scientific Report

    Energy Technology Data Exchange (ETDEWEB)

    Hall, John C. Dr.; Godby, Larry A.

    2012-04-26

    This report covers the scientific progress and results made in the development of high efficiency multijunction solar cells and the light concentrating non-imaging optics for the commercial generation of renewable solar energy. During the contract period the efficiency of the multijunction solar cell was raised from 36.5% to 40% in commercially available fully qualified cells. In addition significant strides were made in automating production process for these cells in order to meet the costs required to compete with commercial electricity. Concurrent with the cells effort Boeing also developed a non imaging optical systems to raise the light intensity at the photovoltaic cell to the rage of 800 to 900 suns. Solar module efficiencies greater than 30% were consistently demonstrated. The technology and its manufacturing were maturated to a projected price of < $0.015 per kWh and demonstrated by automated assembly in a robotic factory with a throughput of 2 MWh/yr. The technology was demonstrated in a 100 kW power plant erected at California State University Northridge, CA.

  10. Apollo decommissioning project, Apollo, Pennsylvania. Final technical report

    International Nuclear Information System (INIS)

    1997-01-01

    In November, 1991 Babcock and Wilcox (B and W) received a grant to partially fund the decommissioning of the former Apollo Nuclear Fuel Facility. The decommissioning was performed in accordance with a Nuclear Regulatory Commission (NRC) approved decommissioning plan. This report summarizes the decommissioning of the Apollo Nuclear Fuel Facility and the radiological surveying of the site to demonstrate that these decommissioning activities were effective in reducing residual activity well below NRC's criteria for release for unrestricted use. The Apollo Nuclear Fuel Facility was utilized by the Nuclear Materials and Equipment Corporation (NUMEC) and B and W for nuclear research and production under Atomic Energy Commission and Department of Energy (DOE) contracts during 20 plus years of nuclear fuel manufacturing operations

  11. No. 2 heating oil/propane program. Final report, 1992/93

    Energy Technology Data Exchange (ETDEWEB)

    McBrien, J.

    1993-05-01

    During the 1992--93 heating season, the Massachusetts Division Energy Resources (DOER) participated in a joint data collection program between several state energy offices and the federal Department of Energy`s (DOE) Energy Information Administration (EIA). The purpose of the program was to collect and monitor retail and wholesale heating oil and propane prices and inventories from October, 1992 through March, 1993. This final report begins with an overview of the unique events which had an impact on the petroleum markets prior to and during the reporting period. Next, the report summarizes the results from residential heating oil and propane price surveys conducted by DOER over the 1992--93 heating season. The report also incorporates the wholesale heating oil and propane prices and inventories collected by the EIA and distributed to the states. Finally, the report outlines DOER`s use of the data.

  12. Contract engineers cut costs, and flexibility

    International Nuclear Information System (INIS)

    Bhargava, V.M.

    1991-01-01

    Today's rapid expansion of technology is an important reason for considering hiring contract engineering labor for your power plant because technical specialization is an important aspect of the contract engineering industry. This paper reports that another reason is addressing peak work loads. Any amount of technical assistance is available to assist in meeting schedules. Although a typical human resources department of a utility or architect/engineer may contain a few hundred active resumes, a contract engineering firm may have upwards of 40,000 resumes on file from all parts of the country. Because contract workers know that contract agencies keep abreast of client needs, they are more apt to forward updated resumes to such agencies. Used properly, a contract engineering company's services will augment the efforts of a human resources group and, in the case of some smaller companies, actually take the place of all internal recruiting efforts

  13. SatisFactory Final System Evaluation Report

    OpenAIRE

    Sunlight SA

    2018-01-01

    The present document is a deliverable of the SatisFactory project, funded by the European Commission’s Directorate-General for Research and Innovation (DG RTD), under its Horizon 2020 Research and innovation programme (H2020). The main objective of this deliverable is to report on the SatisFactory Final System Evaluation, with regards to the industrial pilots at COMAU and SUNLIGHT. The evaluation of SatisFactory platform is based on the implementation of the business scenarios where each tool...

  14. 78 FR 68161 - Greenhouse Gas Reporting Program: Final Amendments and Confidentiality Determinations for...

    Science.gov (United States)

    2013-11-13

    ... 98 Greenhouse Gas Reporting Program: Final Amendments and Confidentiality Determinations for...-HQ-OAR-2011-0028; FRL-9845-6] RIN 2060-AR61 Greenhouse Gas Reporting Program: Final Amendments and... monitoring methodologies for electronics manufacturers covered by the Greenhouse Gas Reporting Rule. These...

  15. Contract Design: The problem of information asymmetry

    Directory of Open Access Journals (Sweden)

    Axel C. Mühlbacher

    2018-01-01

    Full Text Available Introduction: Integrated care systems are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. Little is known about the contractual design and the main challenges of delegating “accountability” to these new kinds of organisations and/or contracts. The research question in this article focuses on how healthcare contracts can look like and which possible problems arise in designing such contracts. In this a special interest is placed on information asymmetries.  Methods: A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. This article is the first in a row of three that all contribute to a specific issue in designing healthcare contracts. Starting with the organisation of contracts and information asymmetries, part 2 focusses on financial options and risks and part 3 finally concludes with the question of risk management and evaluation.  Results: Healthcare contracting between providers and payers will have a major impact on the overall design of future healthcare systems. If Integrated care systems or any other similar concept of care delivery are to be contracted directly by payers to manage the continuum of care the costs of market utilisation play an essential role. Transaction costs also arise in the course of the negotiation and implementation of contracts. These costs are the reason why it is generally not possible to conclude perfect (complete contracts. Problems with asymmetric distribution of information can relate to the situation before a contract is concluded (adverse selection and after conclusion of a contract (moral hazard.  Discussion and Conclusions: Information asymmetries are seen as a major obstacle to the efficient operation of integrated care programmes. Coordination and motivation problems cannot be solved

  16. Contract Design: The problem of information asymmetry.

    Science.gov (United States)

    Mühlbacher, Axel C; Amelung, Volker E; Juhnke, Christin

    2018-01-12

    Integrated care systems are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. Little is known about the contractual design and the main challenges of delegating "accountability" to these new kinds of organisations and/or contracts. The research question in this article focuses on how healthcare contracts can look like and which possible problems arise in designing such contracts. In this a special interest is placed on information asymmetries. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. This article is the first in a row of three that all contribute to a specific issue in designing healthcare contracts. Starting with the organisation of contracts and information asymmetries, part 2 focusses on financial options and risks and part 3 finally concludes with the question of risk management and evaluation. Healthcare contracting between providers and payers will have a major impact on the overall design of future healthcare systems. If Integrated care systems or any other similar concept of care delivery are to be contracted directly by payers to manage the continuum of care the costs of market utilisation play an essential role. Transaction costs also arise in the course of the negotiation and implementation of contracts. These costs are the reason why it is generally not possible to conclude perfect (complete) contracts. Problems with asymmetric distribution of information can relate to the situation before a contract is concluded (adverse selection) and after conclusion of a contract (moral hazard). Information asymmetries are seen as a major obstacle to the efficient operation of integrated care programmes. Coordination and motivation problems cannot be solved at no-costs. The presented problems in the design of selective individual contracts

  17. Electromechanical properties of superconductors for DOE/OFE applications. Final report

    International Nuclear Information System (INIS)

    Ekin, J.W.; Bray, S.L.

    1998-01-01

    In many superconductor applications, especially large magnets, the superconductor is required to perform while under the influence of strong mechanical forces. These forces are commonly due to residual fabrication stress, differential thermal contraction of dissimilar materials, and electromagnetic forces generated within an energized magnet coil. Thorough knowledge of a superconductor's electrical performance under the influence of these forces (electromechanical properties) is required for successful magnet engineering. This report presents results of research conducted during the period from august 1993 through March 1997 on the electromechanical properties of superconductors for DOE/OFE fusion applications

  18. Compact Environmental Anomaly Sensor (CEASE) Flight Integration Support Contract

    National Research Council Canada - National Science Library

    Redus, Robert

    2001-01-01

    .... Under the current contract, Amptek Inc, supported the successful spacecraft specific design work, final calibration, and the delivery, integration, and launch of two CEASE instruments - S/N 001 onto...

  19. Contract Audit Followup: Defense Contract Management Agency Santa Ana Office's Actions on Incurred Cost Audits

    National Research Council Canada - National Science Library

    2005-01-01

    This report addresses the DCMA Santa Ana District Office. DoD Directive 7640.2, "Policy for Follow-up on Contract Audit Reports," February 12, 1988, as amended August 16, 1995, implements OMB Circular A-50...

  20. Case histories of West Valley spent fuel shipments: Final report

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    In 1983, NRC/FC initiated a study on institutional issues related to spent fuel shipments originating at the former spent fuel processing facility in West Valley, New York. FC staff viewed the shipment campaigns as a one-time opportunity to document the institutional issues that may arise with a substantial increase in spent fuel shipping activity. NRC subsequently contracted with the Aerospace Corporation for the West Valley Study. This report contains a detailed description of the events which took place prior to and during the spent fuel shipments. The report also contains a discussion of the shipment issues that arose, and presents general findings. Most of the institutional issues discussed in the report do not fall under NRC's transportation authority. The case histories provide a reference to agencies and other institutions that may be involved in future spent fuel shipping campaigns. 130 refs., 7 figs., 19 tabs.

  1. Case histories of West Valley spent fuel shipments: Final report

    International Nuclear Information System (INIS)

    1987-01-01

    In 1983, NRC/FC initiated a study on institutional issues related to spent fuel shipments originating at the former spent fuel processing facility in West Valley, New York. FC staff viewed the shipment campaigns as a one-time opportunity to document the institutional issues that may arise with a substantial increase in spent fuel shipping activity. NRC subsequently contracted with the Aerospace Corporation for the West Valley Study. This report contains a detailed description of the events which took place prior to and during the spent fuel shipments. The report also contains a discussion of the shipment issues that arose, and presents general findings. Most of the institutional issues discussed in the report do not fall under NRC's transportation authority. The case histories provide a reference to agencies and other institutions that may be involved in future spent fuel shipping campaigns. 130 refs., 7 figs., 19 tabs

  2. Transportation of radioactive material in Michigan. Final report, September 1980-August 1981

    International Nuclear Information System (INIS)

    McCarty, M.J.; Hennigan, J.M.; Bruchmann, G.W.

    1982-05-01

    Most of the radioactive material transported into and through the State of Michigan is comprised of radiopharmaceuticals. The remainder includes radioactive waste from nuclear power plants and hospitals, uranium ore concentrate (yellowcake) from Ontario, Canada, and periodic spent fuel shipments from a university research reactor. Investigations carried out under contract with the US Department of Transportation and the US Nuclear Regulatory Commission have revealed that minor violations of packaging and shipping paper regulations persist but to a lesser degree than in previous years. Major operational problems associated with two courier companies have substantially improved but still require improvement. Several minor transportation accidents are reported, none of which resulted in significant radiation exposure. Joint investigations with federal agencies were made, and some resulted in legal action against shippers. Future work performed will be under a contract with the US Department of Transportation

  3. New Perils for the Contract Ethnographer.

    Science.gov (United States)

    Fetterman, David M.

    1981-01-01

    Conditions of contract research may lead some workers to ignore publication rights of colleagues whose reports are of limited circulation. The author presents a case example of how this process occurred with the use of his own work and argues for rigorous ethical standards in the publication of contract research results. (Author/GC)

  4. Final Report on Contract N00014-92-C-0173 (Office of Naval Research)

    Science.gov (United States)

    2001-01-10

    hydration shell number was n = 6.01 . This is consistent with the calculation of Szasz et al (38), who reported the same value for bulk electrolyte, and the...243, 343 - 351 (1988). (22) G. 1. Szasz , K. Heinzinger, and W. 0. Riede, Z. Naturforsch. 36a, 1067 - 1075 (1981). (23) E. Spohr and K. Heinzinger, .1...D. J. Tildesley, Computer Simulation of Liquids ( Oxford Uni- versity Press, Oxford, 1989), pp. 88-90. (38) G. 1. Szasz , K. lleinzinger, and G

  5. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 80. Quarterly report, July--September, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This report contains information on petroleum enhanced recovery projects. In addition to project descriptions, contract numbers, principal investigators and project management information is included.

  6. Development of RODOS, a comprehensive real-time on-line decision support system for nuclear emergency management in Europe. Final report

    International Nuclear Information System (INIS)

    Ehrhardt, J.; Weis, A.

    1996-09-01

    The development of RODOS, a comprehensive, Real-time, On-line DecisiOn Support system for nuclear emergency management, that would be capable of finding broad application across Europe was included as a major item in the Radiation Protection Research Action of the European Commission's 3rd Framework Programme; it remains an important priority in the 4th Framework programme (1995-1998). When complete, the RODOS system is intended to be applicable from the vicinity of the release and the early phases of an accident to far distant areas and longer time periods. In this way it will be possible to achieve estimates, analyses, and prognoses of accident consequences with and without considering protective actions and countermeasures, which are consistent throughout all accident phases and distance ranges. It will also be possible to evaluate alternative combinations of measures in term of both, feasibility in the given situation, and public acceptability, socio-psychological and political implications. This Final Report summarises the results achieved by the partners of the EC contract FI3P-CT92-0036 within the time period 1992 to 1995, and more generally, gives an overview of the development status of the RODOS system and its functionalities realised by the end of the contract period. (orig.) [de

  7. Process Improvement for Interinstitutional Research Contracting.

    Science.gov (United States)

    Varner, Michael; Logan, Jennifer; Bjorklund, Todd; Whitfield, Jesse; Reed, Peggy; Lesher, Laurie; Sikalis, Amy; Brown, Brent; Drollinger, Sandy; Larrabee, Kristine; Thompson, Kristie; Clark, Erin; Workman, Michael; Boi, Luca

    2015-08-01

    Sponsored research increasingly requires multiinstitutional collaboration. However, research contracting procedures have become more complicated and time consuming. The perinatal research units of two colocated healthcare systems sought to improve their research contracting processes. The Lean Process, a management practice that iteratively involves team members in root cause analyses and process improvement, was applied to the research contracting process, initially using Process Mapping and then developing Problem Solving Reports. Root cause analyses revealed that the longest delays were the individual contract legal negotiations. In addition, the "business entity" was the research support personnel of both healthcare systems whose "customers" were investigators attempting to conduct interinstitutional research. Development of mutually acceptable research contract templates and language, chain of custody templates, and process development and refinement formats decreased the Notice of Grant Award to Purchase Order time from a mean of 103.5 days in the year prior to Lean Process implementation to 45.8 days in the year after implementation (p = 0.004). The Lean Process can be applied to interinstitutional research contracting with significant improvement in contract implementation. © 2015 Wiley Periodicals, Inc.

  8. Biomass Support for the China Renewable Energy Law: Final Report, December 2005

    Energy Technology Data Exchange (ETDEWEB)

    2006-10-01

    Final subcontractor report giving an overview of the biomass power generation technologies used in China. Report covers resources, technologies, foreign technologies and resources for comparison purposes, biomass potential in China, and finally government policies in China that support/hinder development of the using biomass in China for power generation.

  9. Number 2 heating oil/propane program. Final report, 1991/92

    Energy Technology Data Exchange (ETDEWEB)

    McBrien, J.

    1992-06-01

    During the 1991--92 heating season, the Massachusetts Division of Energy Resources (DOER) participated in a joint data collection program between several state energy offices and the federal Department of Energy`s (DOE) Energy Information Administration (EIA). The purpose of the program was to collect and monitor retail and wholesale heating oil and propane prices and inventories from October, 1991 through March, 1992. This final report begins with an overview of the unique events which had an impact on the reporting period. Next, the report summarizes the results from the residential heating oil and propane price surveys conducted by DOER over the 1991--1992 heating season. The report also incorporates the wholesale heating oil and propane prices and inventories collected by the EIA and distributed to the states. Finally, the report outlines DOER`s use of the data and responses to the events which unfolded during the 1991--1992 heating season.

  10. A Business Case for Home Performance Contracting

    Energy Technology Data Exchange (ETDEWEB)

    Baechler, Michael C.; Antonopoulos, Chrissi A.; Sevigny, Maureen; Gilbride, Theresa L.; Hefty, Marye G.

    2012-10-01

    This report was prepared by PNNL for the DOE Building America program. The report provides information for businesses considering entering the home performance contracting industry. Metrics discussed include industry trends and drivers, specific points of entry, business models, startup costs, and marketing strategies. The report includes detailed analysis of eight businesses around the country that have successfully entered the home performance contracting industry. Data is provided on their financial structures, program participation, marketing efforts, and staff training. This report will be distributed via the DOE Building America website, www.buildingamerica.gov. Individual case studies will also be cleared separately.

  11. Solar Energy Grid Integration Systems. Final Report of the Princeton Power Systems Development of the 100kW Demand Response Inverter.

    Energy Technology Data Exchange (ETDEWEB)

    Bower, Ward Isaac; Heavener, Paul (Princeton Power Systems, Inc., Princeton, NJ); Sena-Henderson, Lisa; Hammell, Darren (Princeton Power Systems, Inc., Princeton, NJ); Holveck, Mark (Princeton Power Systems, Inc., Princeton, NJ); David, Carolyn; Akhil, Abbas Ali; Gonzalez, Sigifredo

    2012-01-01

    Initiated in 2008, the Solar Energy Grid Integration (SEGIS) program is a partnership involving the U.S. Department of Energy, Sandia National Laboratories, electric utilities, academic institutions and the private sector. Recognizing the need to diversify the nation's energy portfolio, the SEGIS effort focuses on specific technologies needed to facilitate the integration of large-scale solar power generation into the nation's power grid Sandia National Laboratories (SNL) awarded a contract to Princeton Power Systems, Inc., (PPS) to develop a 100kW Advanced AC-link SEGIS inverter prototype under the Department of Energy Solar Energy Technologies Program for near-term commercial applications. This SEGIS initiative emphasizes the development of advanced inverters, controllers, communications and other balance-of-system components for photovoltaic (PV) distributed power applications. The SEGIS Stage 3 Contract was awarded to PPS on July 28, 2010. PPS developed and implemented a Demand Response Inverter (DRI) during this three-stage program. PPS prepared a 'Site Demonstration Conference' that was held on September 28, 2011, to showcase the cumulative advancements. This demo of the commercial product will be followed by Underwriters Laboratories, Inc., certification by the fourth quarter of 2011, and simultaneously the customer launch and commercial production sometime in late 2011 or early 2012. This final report provides an overview of all three stages and a full-length reporting of activities and accomplishments in Stage 3.

  12. Portable linear accelerator development. Final report

    International Nuclear Information System (INIS)

    Schonberg, R.G.

    1983-01-01

    The final report on Project RP 822-6 describes the MINAC 3 development from the recognition of need for a lightweight, portable high-energy device to the successful completion and field use of the MINAC. MINAC, which represents a substantial improvement in field radiographic capability and in technology, rapidly transitioned from proof-of-principle (1978 to 1980) to field-proven product (1980 to 1981). As a result, the decision has been made to develop this report as a users guide as well as a historic record of design, development, and testing program. The first section of this report has the following principal objectives: to describe the existing MINAC equipment capabilities and achievable modifications; to provide applications information for prospective users; and to provide technical information on high-energy radiography useful for familiarization and planning. The users guide section is followed by sections which describe the design basis, development, and application history of MINAC through the course of EPRI RP822 research projects 1 to 5, inclusively

  13. Dresden 1 plutonium recycle program. Final report

    International Nuclear Information System (INIS)

    Bresnick, S.D.

    1980-01-01

    This is the final report on the Dresden 1 Plutonium Recycle Demonstration Program. It covers the work performed from July 1, 1978 to completion, which includes in-pool inspection of two fuel assemblies, removal of two fuel rods, and post-irradiation examination (PIE) of six fuel rods. Appendix A describes the inspection and rod removal operations, and Appendix B describes the PIE work

  14. Compilation of contract research for the Materials Engineering Branch, Division of Engineering Technology. Annual report for FY 1982

    International Nuclear Information System (INIS)

    1983-03-01

    This report presents summaries of the research work performed during Fiscal Year 1982 by laboratories and organizations under contracts administered by the NRC's Materials Engineering Branch, Office of Nuclear Regulatory Research. The contractor reports are organized into the major areas of concern to Primary System Integrity: Vessel and Piping Fracture Mechanics; Pressure Vessel Surveillance Dosimetry; Steam Generators and Environmental Cracking; and Nondestructive Examination

  15. 48 CFR 1352.201-72 - Contracting Officer's Representative (COR).

    Science.gov (United States)

    2010-10-01

    ... COR is also responsible for the final inspection and acceptance of all deliverables and such other... otherwise obligate the Government or authorize any changes which affect the contract price, terms or...

  16. Improved Barriers to Turbine Engine Fragments: Final Annual Report

    National Research Council Canada - National Science Library

    Shockey, Donald

    2002-01-01

    This final annual technical report describes the progress rnade during year 4 of the SPI International Phase II effort to develop a computational capability for designing lightweight fragment barriers...

  17. Consistency Checking of Web Service Contracts

    DEFF Research Database (Denmark)

    Cambronero, M. Emilia; Okika, Joseph C.; Ravn, Anders Peter

    2008-01-01

    Behavioural properties are analyzed for web service contracts formulated in Business Process Execution Language (BPEL) and Choreography Description Language (CDL). The key result reported is an automated technique to check consistency between protocol aspects of the contracts. The contracts...... are abstracted to (timed) automata and from there a simulation is set up, which is checked using automated tools for analyzing networks of finite state processes. Here we use the Concurrency Work Bench. The proposed techniques are illustrated with a case study that include otherwise difficult to analyze fault...

  18. Nuclear and non-nuclear risk. An exercise in comparability. Final report

    International Nuclear Information System (INIS)

    1980-01-01

    The present report is the result of a study contract given out by the CEC in order to collect useful information and opinions in the area of risk assessment and related concepts such as risk acceptability, risk perception and acceptance. The main objectives of the study are to examine the underlying factors which determine the existing levels of non-nuclear risks, and the extent to which societies are likely to seek means of reducing them, and to suggest means of working towards the derivation of acceptable nuclear risks which will be compatible with practice in relation to non-nuclear risks. The Case Studies which comprise Volume 2 of this Report are based on UK experience

  19. Compilation of contract research for the Materials Branch, Division of Engineering Safety: Annual report for FY 1986

    International Nuclear Information System (INIS)

    1987-03-01

    This report presents summaries of the research work performed during Fiscal Year 1986 by laboratories and organizations under contracts administered by the NRC's Materials Branch, Office of Nuclear Regulatory Research. Each contractor has written a more complete and detailed annual report of their work which can be obtained by writing to NRC; however, we believe it is useful to have a summary of each contractor's efforts for the year combined into one volume

  20. PROJECT HANFORD MANAGEMENT CONTRACT (PHMC) PERFORMANCE REPORT 05/2004 (WWW.HANFORD.GOV/EMPR.INDEX.CFM)

    International Nuclear Information System (INIS)

    PIELSTICK, R.M.

    2004-01-01

    This report is the monthly performance summary of the Central Plateau Contractors. FH work scope responsibilities are described, and other contractor/RL-managed work is excluded. Section A, Overview, provides a summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides key performance activities as extracted from the contractor baseline. Subsequent sections of this report provide detailed performance data relative to contract sections (e.g., Project Hanford Cleanup Work Summary, Waste and Spent Nuclear Fuel Management Operations, Infrastructure and Hanford Site Services, and other Work Scope). All information is as of the end of May 2004 unless otherwise noted

  1. Cathodic Protection Field Trials on Prestressed Concrete Components, Final Report

    Science.gov (United States)

    1998-01-01

    This is the final report in a study to demonstrate the feasibility of using cathodic protection (CP) on concrete bridge structures containing prestressed steel. The interim report, FHWA-RD-95-032, has more details on the installation of selected CP s...

  2. Sodium sulfur electric vehicle battery engineering program final report, September 2, 1986--June 15, 1993

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-06-01

    In September 1986 a contract was signed between Chloride Silent Power Limited (CSPL) and Sandia National Laboratories (SNL) entitled ``Sodium Sulfur Electric Vehicle Battery Engineering Program``. The aim of the cost shared program was to advance the state of the art of sodium sulfur batteries for electric vehicle propulsion. Initially, the work statement was non-specific in regard to the vehicle to be used as the design and test platform. Under a separate contract with the DOE, Ford Motor Company was designing an advanced electric vehicle drive system. This program, called the ETX II, used a modified Aerostar van for its platform. In 1987, the ETX II vehicle was adopted for the purposes of this contract. This report details the development and testing of a series of battery designs and concepts which led to the testing, in the US, of three substantial battery deliverables.

  3. ClearFuels-Rentech Integrated Biorefinery Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Pearson, Joshua [Project Director

    2014-02-26

    The project Final Report describes the validation of the performance of the integration of two technologies that were proven individually on a pilot scale and were demonstrated as a pilot scale integrated biorefinery. The integrated technologies were a larger scale ClearFuels’ (CF) advanced flexible biomass to syngas thermochemical high efficiency hydrothermal reformer (HEHTR) technology with Rentech’s (RTK) existing synthetic gas to liquids (GTL) technology.

  4. Statutory Requirements of Teacher Contract Laws: A Comparison of the 50 States' Continuing Contract and Teacher Tenure Laws.

    Science.gov (United States)

    Gorkom, Kris Van

    This publication summarizes and compares legal provisions covering teacher tenure and contracts for each of the 50 states. The report is organized in three sections. Section 1 presents a summary comparison of the provisions of Washington's teacher contract law with corresponding statutory requirements of the other 49 states. Section 2 identifies…

  5. Archaeology audit program final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-04-15

    In order to review oil and gas companies' archaeological management systems, the British Columbia Oil and Gas Commission (OGC) introduced its archaeology audit program (AAP) in April 2008. As part of this audit, twenty six oil and gas companies were selected for an office documentation review and a corresponding field audit. This document presented and described these audit results. The purpose of the final audit report was to provide information to assist oil and gas companies to improve their management systems by increasing the emphasis of the preservation of cultural resources. This report presented an overview of the AAP scope and methodology and provided examples from the audit of both good management practices encountered and practices in which opportunities for improvement to archaeological management systems could be implemented. Recommendations to address improvement opportunities were also discussed. It was concluded that the oil and gas companies subject to the audit were found to have met or exceeded OGC expectations for maintaining archaeological management systems. 2 tabs., 7 figs.

  6. Admiralty Inlet Pilot Tidal Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Collar, Craig [Public Utility District No. 1 of Snohomish County, Everett, WA (United States)

    2015-09-14

    This document represents the final report for the Admiralty Inlet Pilot Tidal Project, located in Puget Sound, Washington, United States. The Project purpose was to license, permit, and install a grid-connected deep-water tidal turbine array (two turbines) to be used as a platform to gather operational and environmental data on tidal energy generation. The data could then be used to better inform the viability of commercial tidal energy generation from technical, economic, social, and environmental standpoints. This data would serve as a critical step towards the responsible advancement of commercial scale tidal energy in the United States and around the world. In late 2014, Project activities were discontinued due to escalating costs, and the DOE award was terminated in early 2015. Permitting, licensing, and engineering design activities were completed under this award. Final design, deployment, operation, and monitoring were not completed. This report discusses the results and accomplishments achieved under the subject award.

  7. Medicare program; contracts with health maintenance organizations (HMOs) and competitive medical plans (CMPs)--HCFA. Final rule with comment period.

    Science.gov (United States)

    1995-09-01

    This rule clarifies and updates portions of the HCFA regulations that pertain to the following: The conditions that an HMO or CMP must meet to qualify for a Medicare contract (Subpart J). The contract requirements (Subpart L). The rules for enrollment, entitlement, and disenrollment of Medicare beneficiaries in a contracting HMO or CMP (Subpart K). How a Medicare contract is affected when there is change of ownership or leasing of facilities of a contracting HMO or CMP (Subpart M). These are technical and editorial changes that do not affect the substance of the regulations. They are intended to make it easier to find particular provisions, to provide overviews of the different program aspects, and to better ensure uniform understanding of the rules.

  8. 10 CFR 52.157 - Contents of applications; technical information in final safety analysis report.

    Science.gov (United States)

    2010-01-01

    ...; technical information in final safety analysis report. The application must contain a final safety analysis... 10 Energy 2 2010-01-01 2010-01-01 false Contents of applications; technical information in final safety analysis report. 52.157 Section 52.157 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES...

  9. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Science.gov (United States)

    2010-01-01

    ...; technical information in final safety analysis report. (a) The application must contain a final safety... 10 Energy 2 2010-01-01 2010-01-01 false Contents of applications; technical information in final safety analysis report. 52.79 Section 52.79 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES...

  10. Nanomaterial Case Study: Nanoscale Silver in Disinfectant Spray (Final Report)

    Science.gov (United States)

    EPA announced the release of the final report, Nanomaterial Case Study: Nanoscale Silver in Disinfectant Spray. This report represents a case study of engineered nanoscale silver (nano-Ag), focusing on the specific example of nano-Ag as possibly used in disinfectant spr...

  11. 78 FR 46695 - Secretarial Review and Publication of the Annual Report to Congress Submitted by the Contracted...

    Science.gov (United States)

    2013-08-01

    ...-year period. The contract specified that the CBE should conduct its business in an open and transparent... NQS progress report required by Congress. Beyond forging agreement at the strategic goal level, it is challenging to get leaders to implement agreed-upon strategies at the care delivery and community level, given...

  12. Final Report: Performance Engineering Research Institute

    Energy Technology Data Exchange (ETDEWEB)

    Mellor-Crummey, John [Rice Univ., Houston, TX (United States)

    2014-10-27

    This document is a final report about the work performed for cooperative agreement DE-FC02-06ER25764, the Rice University effort of Performance Engineering Research Institute (PERI). PERI was an Enabling Technologies Institute of the Scientific Discovery through Advanced Computing (SciDAC-2) program supported by the Department of Energy's Office of Science Advanced Scientific Computing Research (ASCR) program. The PERI effort at Rice University focused on (1) research and development of tools for measurement and analysis of application program performance, and (2) engagement with SciDAC-2 application teams.

  13. Administration of the Contract Closeout Process Within DoD

    National Research Council Canada - National Science Library

    1992-01-01

    .... The three prior reports addressed the objectives related to the timeliness of contract closeout, the validity of unliquidated obligations, the collection of over-payments on incentive contracts...

  14. ATAC Process Proof of Concept Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Bri Rolston; Sarah Freeman

    2014-03-01

    Researchers at INL with funding from the Department of Energy’s Office of Electricity Delivery and Energy Reliability (DOE-OE) evaluated a novel approach for near real-time consumption of threat intelligence. Demonstration testing in an industry environment supported the development of this new process to assist the electric sector in securing their critical networks. This report provides the reader with an understanding of the methods used during this proof of concept project. The processes and templates were further advanced with an industry partner during an onsite assessment. This report concludes with lessons learned and a roadmap for final development of these materials for use by industry.

  15. Banking contracts

    OpenAIRE

    Durčáková, Klára

    2010-01-01

    Resumé - Bank Contracts Bank Contracts are an integral part of our everyday lives. Citizen and bussines entities used bank contracts very often. Despite this fact we can't find legal definition in the Czech law. Banking contracts understand contracts that are signed by banks in their business activities and obligations under these contracts arise. While the banking contracts have been widely used, in Czech law there is not too much literature and judgements abou this issue. Lack of legislatio...

  16. Sustainable refurbishment of exterior walls and building facades. Final report, Part A - Methods and recommendations

    Energy Technology Data Exchange (ETDEWEB)

    Hakkinen, T. (ed.)

    2012-11-01

    This report is the final report of Sustainable refurbishment of building facades and exterior walls (SUSREF). SUSREF project was a collaborative (small/medium size) research project within the 7th Framework Programme of the Commission and it was financed under the theme Environment (including climate change) (Grant agreement no. 226858). The project started in October 1st 2009 and ended in April 30th 2012. The project included 11 partners from five countries. SUSREF developed sustainable concepts and technologies for the refurbishment of building facades and external walls. This report together with SUSREF Final report Part B and SUSREF Final Report Part C introduce the main results of the project. Part A focuses on methodological issues. The descriptions of the concepts and the assessment results of the developed concepts are presented in SUSREF Final report part B (generic concepts) and SUSREF Final report Part C (SME concepts). (orig.)

  17. Michigan Physicians' Conference on Elder Abuse. Final Report.

    Science.gov (United States)

    Sengstock, Mary C.; O'Brien, James G.

    The final report describes the Michigan Physicians' Conference on Elder Abuse project. The project conference had four major content areas, including: a general introduction to the problem of elder abuse; clinical symptoms of abuse; legal issues; and referral and case management techniques. Training techniques included lectures, group discussion,…

  18. Solar Market Analytics, Roadmapping, and Tracking NY (SMART NY) Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Case, Tria [City University of New York; Reilly, Laurie [City University of New York; Kling, Alison [Con Edison, formerly City University of New York

    2014-05-15

    This is the final report, including links to Working Group reports and an attached Working Group report for SunShot Initiative Rooftop Solar Challenge I, from Sustainable CUNY of the City University of New York, on behalf of New York City

  19. PHENIX reports. Final report

    International Nuclear Information System (INIS)

    1998-01-01

    The various tasks outlined in the Statement of Work for the PHENIX Program have been accomplished. Reports were generated which cover the work done. This report is a compilation of the following reports: Progress Report for May 1998; Progress Report for April 1998; PHENIX FEA Mount/Electron Shield Structural Analysis report; Progress Report for February 1998; Progress Report for March 1998; and Progress Report for December 1997 and January 1998

  20. Competence for Contract and Competence to Consent to Treatment

    OpenAIRE

    前田, 泰

    2008-01-01

    This paper analyzes assessing competence to consent to treatment. It focuses on problems of competence for contract and competence to consent to treatment. Finally, it discusses the degree of assessing competence to consent to treatment.

  1. Simulated coal gas MCFC power plant system verification. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-30

    The objective of the main project is to identify the current developmental status of MCFC systems and address those technical issues that need to be resolved to move the technology from its current status to the demonstration stage in the shortest possible time. The specific objectives are separated into five major tasks as follows: Stack research; Power plant development; Test facilities development; Manufacturing facilities development; and Commercialization. This Final Report discusses the M-C power Corporation effort which is part of a general program for the development of commercial MCFC systems. This final report covers the entire subject of the Unocal 250-cell stack. Certain project activities have been funded by organizations other than DOE and are included in this report to provide a comprehensive overview of the work accomplished.

  2. ESSENTIAL CLAUSES OF INDIVIDUAL EMPLOYMENT CONTRACT - QUESTIONS AND ANSWERS

    Directory of Open Access Journals (Sweden)

    Monica Gheorghe

    2016-11-01

    Full Text Available This study aims to analyze the legal texts of the Labour Code which refers to the elements / clauses in individual employment contract and clarifying those that have been essential. Rules of the Labour Code which refer to the contents of the individual employment contract are not consistent. The texts of the La bour Code which refer to the essential and specific clauses in individual employment contract are art. 17 para. (1 - (3, art. 20 and art. 41-48. Also Order no. 64/2003 sets out the mandatory elements that must be included in the individual employment con tract, showing that through negotiation between the parties, the contract may include specific clauses under the law. The analysis is done in the light of the provisions of art. 1179 and art. 1185 of the Civil Code, as in common law. At the end of the stud y, we conclude that certain provisions were essential character to the conclusion of any individual employment contract, others result of the negotiation, have essential character only to the contracting parties, while certain clauses are essential for certain types of individual employment contracts . Finally, it is assessed and the consequences of lack of essential clauses and establish its content contrary to legal norms.

  3. Report on the Audit of Foreign Direct Selling Costs

    National Research Council Canada - National Science Library

    1990-01-01

    This is our final report on the Audit of Foreign Direct Selling Costs. The Contract Management Directorate made the audit from October 1989 to January 1990 in response to a requirement in U.S.C., title 10, Sec. 2324(f)(5...

  4. Sweep-twist adaptive rotor blade : final project report.

    Energy Technology Data Exchange (ETDEWEB)

    Ashwill, Thomas D.

    2010-02-01

    Knight & Carver was contracted by Sandia National Laboratories to develop a Sweep Twist Adaptive Rotor (STAR) blade that reduced operating loads, thereby allowing a larger, more productive rotor. The blade design used outer blade sweep to create twist coupling without angled fiber. Knight & Carver successfully designed, fabricated, tested and evaluated STAR prototype blades. Through laboratory and field tests, Knight & Carver showed the STAR blade met the engineering design criteria and economic goals for the program. A STAR prototype was successfully tested in Tehachapi during 2008 and a large data set was collected to support engineering and commercial development of the technology. This report documents the methodology used to develop the STAR blade design and reviews the approach used for laboratory and field testing. The effort demonstrated that STAR technology can provide significantly greater energy capture without higher operating loads on the turbine.

  5. Sensing technology for damage assessment of sign supports and cantilever poles : final report, August 31, 2010.

    Science.gov (United States)

    2010-08-31

    This report presents the results of research activities conducted under Contract No. 519691-PIT 008 on Sensing Technology for : Damage Assessment of Sign Supports and Cantilever Poles between the University of Pittsburgh and the Pennsylvania De...

  6. CONTRACT LABOUR SYSTEM AND LESSONS FOR POST ...

    African Journals Online (AJOL)

    Shiweda

    2017-02-02

    Feb 2, 2017 ... men to report for contract labour, but this was futile as Kavango ... ecological responses into a comprehensive system of labour control ... provided in 1935 did not only prevent the men from Kavango and Ovambo from moving .... The underlying dehumanizing actions of contract labour can be traced to the.

  7. Stability of contracts in the Brazilian wine industry

    Directory of Open Access Journals (Sweden)

    Decio Zylbersztajn

    2005-06-01

    Full Text Available A variety of contracts between wineries and grape growers are observed in Brazil. This study addresses the concept of coordination of food chains, particularly the stability of contractual relationships. A qualitative analysis of industry-farmers contracts is presented, followed by a quantitative analysis testing transaction cost economics-based hypothesis. Scale, location, age of vineyard, and the cooperative organizational form are addressed in terms of the effect on the stability of contracts. Vertical and horizontal coordination are addressed. Data come from a sample of 139 grape-growers that supplied 10 major wineries. The results show that more stable contracts or vertical integration are characteristic of high quality wine production, where the need for strict contractual coordination is more relevant, i.e. risk of hold up losses is larger. We test the hypothesis that site specificity and quality-related specific investments are associated with more stable contractual architectures. Farmers' cooperatives present poorer performance but tend to hold more stable relationships with their members, possibly the result of adverse selection, since specialized farmers prefer to maintain contracts with investor-owned wineries, instead of farmers' cooperatives. Conclusions are presented in the final part.

  8. Sustainability Logistics Basing - Science and Technology Objective - Demonstration; Industry Assessment and Demonstration Final Report

    Science.gov (United States)

    2017-08-14

    TECHNICAL REPORT AD ________________ NATICK/TR-17/019 SUSTAINABILITY ...LOGISTICS BASING – SCIENCE & TECHNOLOGY OBJECTIVE – DEMONSTRATION; INDUSTRY ASSESSMENT AND DEMONSTRATION FINAL REPORT by Elizabeth D. Swisher and...Benjamin J. Campbell August 2017 Final Report December 2014 – February 2016 Approved for public release; distribution is

  9. Plutonium Finishing Plant (PFP) Final Safety Analysis Report (FSAR) [SEC 1 THRU 11

    Energy Technology Data Exchange (ETDEWEB)

    ULLAH, M K

    2001-02-26

    The Plutonium Finishing Plant (PFP) is located on the US Department of Energy (DOE) Hanford Site in south central Washington State. The DOE Richland Operations (DOE-RL) Project Hanford Management Contract (PHMC) is with Fluor Hanford Inc. (FH). Westinghouse Safety Management Systems (WSMS) provides management support to the PFP facility. Since 1991, the mission of the PFP has changed from plutonium material processing to preparation for decontamination and decommissioning (D and D). The PFP is in transition between its previous mission and the proposed D and D mission. The objective of the transition is to place the facility into a stable state for long-term storage of plutonium materials before final disposition of the facility. Accordingly, this update of the Final Safety Analysis Report (FSAR) reflects the current status of the buildings, equipment, and operations during this transition. The primary product of the PFP was plutonium metal in the form of 2.2-kg, cylindrical ingots called buttoms. Plutonium nitrate was one of several chemical compounds containing plutonium that were produced as an intermediate processing product. Plutonium recovery was performed at the Plutonium Reclamation Facility (PRF) and plutonium conversion (from a nitrate form to a metal form) was performed at the Remote Mechanical C (RMC) Line as the primary processes. Plutonium oxide was also produced at the Remote Mechanical A (RMA) Line. Plutonium processed at the PFP contained both weapons-grade and fuels-grade plutonium materials. The capability existed to process both weapons-grade and fuels-grade material through the PRF and only weapons-grade material through the RMC Line although fuels-grade material was processed through the line before 1984. Amounts of these materials exist in storage throughout the facility in various residual forms left from previous years of operations.

  10. Choreographies and Behavioural Contracts on the Way to Dynamic Updates

    Directory of Open Access Journals (Sweden)

    Mario Bravetti

    2014-11-01

    Full Text Available We survey our work on choreographies and behavioural contracts in multiparty interactions. In particular theories of behavioural contracts are presented which enable reasoning about correct service composition (contract compliance and service substitutability (contract refinement preorder under different assumptions concerning service communication: synchronous address or name based communication with patient non-preemptable or impatient invocations, or asynchronous communication. Correspondingly relations between behavioural contracts and choreographic descriptions are considered, where a contract for each communicating party is, e.g., derived by projection. The considered relations are induced as the maximal preoders which preserve contract compliance and global traces: we show maximality to hold (permitting services to be discovered/substituted independently for each party when contract refinement preorders with all the above asymmetric communication means are considered and, instead, not to hold if the standard symmetric CCS/pi-calculus communication is considered (or when directly relating choreographies to behavioral contracts via a preorder, no matter the communication mean. The obtained maximal preorders are then characterized in terms of a new form of testing, called compliance testing, where not only tests must succeed but also the system under test (thus relating to controllability theory, and compared with classical preorders such as may/must testing, trace inclusion, etc. Finally, recent work about adaptable choreographies and behavioural contracts is presented, where the theory above is extended to update mechanisms allowing choreographies/contracts to be modified at run-time by internal (self-adaptation or external intervention.

  11. Zero-emission vehicle technology assessment. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Woods, T.

    1995-08-01

    This is the final report in the Zero-Emission Vehicle (ZEV) Technology Assessment, performed for NYSERDA by Booz-Allen & Hamilton Inc. Booz-Allen wrote the final report, and performed the following tasks as part of the assessment: assembled a database of key ZEV organizations, their products or services, and plans; described the current state of ZEV technologies; identified barriers to widespread ZEV deployment and projected future ZEV technical capabilities; and estimated the cost of ZEVs from 1998 to 2004. Data for the ZEV Technology Assessment were obtained from several sources, including the following: existing ZEV industry publications and Booz-Allen files; major automotive original equipment manufacturers; independent electric vehicle manufacturers; battery developers and manufacturers; infrastructure and component developers and manufacturers; the U.S. Department of Energy, the California Air Resources Board, and other concerned government agencies; trade associations such as the Electric Power Research Institute and the Electric Transportation Coalition; and public and private consortia. These sources were contacted by phone, mail, or in person. Some site visits of manufacturers also were conducted. Where possible, raw data were analyzed by Booz-Allen staff and/or verified by independent sources. Performance data from standardized test cycles were used as much as possible.

  12. Operator and contractor benefit from incentive contracts

    International Nuclear Information System (INIS)

    Brandon, B.

    1991-01-01

    This book reports that with incentive contracts, drilling and service contractors assume greater responsibility for operations. That helps them to align their goals more closely with those of the operator. This achieves a more equitable division of the risks. Many operators and contractors believe this is a more appropriate approach to contracting drilling services. As they assume manageable responsibility, each party also has opportunities for greater reward. Innovations in cooperation can create a win-win situation. In a win-win contract all parties benefit from the new relationships between operator, contractor, and service company. The win-win situation can only be achieved by allowing the contracting parties to become much more closely involved in drilling operations. This is the primary motivation behind development of more productive contracting strategies

  13. Evaluation Report on Defense Contract Audit Agency Audits of Requests for Equitable Adjustment

    National Research Council Canada - National Science Library

    1997-01-01

    Contractors may submit requests for equitable adjustment (REAs) of costs or prices as proposals under the Federal Acquisition Regulation governing contract modifications or as claims under the Contract Disputes Act...

  14. Ocean thermal energy conversion power system development-I. Preliminary design report. Volume 3. Appendixes D, E, and F. Phase I. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1978-12-18

    The conceptual design of a 40 to 50 MW closed cycle ammonia OTEC commercial plant, the preliminary design of a 10 MW OTEC module analogous to the 50 MW module, and the preliminary design of heat exchanger test articles (evaporator and condenser) representative of the 50 MW heat exchangers for testing in OTEC-1 are presented. This volume includes the appendices: D) system equipment (hardware breakdown structure; 10-MW hardware listing; list of support and maintenance equipment, tools and spare parts; sacrificial anodes; M.A.N. brush; and Alclad 3004 data); E) heat exchanger supporting data (analyses/configuration, contract tooling, manufacturing plan, specification, and evaporator ammonia liquid distribution system); and F) rotating machinery (performance characteristics, radial inflow turbine; item descriptions; weight calculation-rotor; producibility analysis; long lead-time items; spares; support equipment; non recurring costs; performance characteristics-axial flow turbine; Worthington pump data; and American M.A.N. Corporation data). Also included is attachment 1 to the phase I final report which presents details of the system modeling; design, materials considerations, and systems analysis of the baseline module; system cost analysis; and supporting data. (WHK)

  15. X-ray emission in heavy ion collisions. Final report

    International Nuclear Information System (INIS)

    Watson, R.L.

    1984-01-01

    A detailed accounting of the yearly activities of the research program entitled X-ray Emission in Heavy Ion Collisions may be found in the annual progress reports submitted in accordance with the terms of the contract. The principal goals of the program to be summarized herein were (a) to delineate the mechanisms whereby highly ionized atoms in the condensed phase deexcite and return to charge neutrality, (b) to investigate the charge quenching processes acting to reduce the charge states of highly ionized projectiles, and (c) to attain a better understanding of the interactions occurring between highly charged ions and solid surfaces. These projects all relate to problems associated with the ultimate application of controlled thermonuclear reactions as a practical energy source

  16. Synthesis of 6-Methyl-9-propyldibenzothiophene-4-ol amended to 9-isopropyl-6-methyldibenzothiophene-4-ol. Final technical report, July 25, 1991--January 25, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Eisenbraun, E.J.

    1992-02-17

    This is a draft final technical report on Task 1 of a contract to synthesize 6-Methyl-9-propyldibenzothiophene-4-ol, as amended to 9- isopropyl-6-methyldibenzothiophene-4-ol. This report is a compilation of data presented in earlier reports. The first annual report dealt with an attempted synthesis of 4-methoxy-6-methyl-9- propyldibenzothiophene (the original target compound), the successful synthesis and delivery of 200 grams of the sulfide 1,4-diethyl-2- [(2{prime}-methoxyphenyl)-thio]benzene, and initial work on a new synthesis route for the preparation of the new target compound 9- isopropyl-6-methyldibenzothiophene-4-ol. The change to the new target compound and the new synthesis route became necessary when it was learned that the sulfide mixture could not be cyclized to the substituted dibenzothiophene mixture. The second annual report described the successful preparation of 45 g of the new target compound using the new synthesis route. Subsequently funds were provided to synthesize an additional 45 g of the new target using the same reaction scheme. This task was recently completed.

  17. Technical considerations associated with spent fuel acceptance. Final report

    International Nuclear Information System (INIS)

    Supko, E.M.

    1996-06-01

    This study was initiated by the Electric Power Research Institute (EPRI) to identify technical considerations associated with spent fuel acceptance and implementation of a waste management system that includes the use of transportable storage systems, and to serve as an opening dialogue among Standard Contract Holders and the department of Energy's Office of Civilian Radioactive Waste management (OCRWM) prior to the development of waste acceptance criteria or issuance of a Notice of Proposed Rulemaking by OCRWM to amend the Standard Contract. The original purpose of the Notice of Proposed Rulemaking was to address changes to the Standard Contract to implement a multi-purpose canister based system and to address other issues that were not adequately addressed in the standard contract. Even if DOE does not develop a multi-purpose canister based system for waste acceptance, it will still be necessary to develop waste acceptance criteria in order to accept spent fuel in transportable storage systems that are being deployed for at-reactor storage. In this study, technical issues associated with spent fuel acceptance will be defined and potential options and alternatives for resolution of technical considerations will be explored

  18. FOCUS: a fire management planning system -- final report

    Science.gov (United States)

    Frederick W. Bratten; James B. Davis; George T. Flatman; Jerold W. Keith; Stanley R. Rapp; Theodore G. Storey

    1981-01-01

    FOCUS (Fire Operational Characteristics Using Simulation) is a computer simulation model for evaluating alternative fire management plans. This final report provides a broad overview of the FOCUS system, describes two major modules-fire suppression and cost, explains the role in the system of gaming large fires, and outlines the support programs and ways of...

  19. Final report on: Grain size determination in zirconium alloys (IAEA Research Contract No. 6025/Rb.)

    International Nuclear Information System (INIS)

    Martinez M, E.

    1991-12-01

    In spite of the amount of research developed the knowledge still is far from complete and in this basis the International Atomic Energy Agency, (IAEA), by means of the Working Group on Water Reactor Fuel Performance and Technology, initiated, in 1990 the Coordinated Research Programme named Grain Size Determination In Zirconium Alloys. Several countries were invited to participate and to contribute to the main objective of the programme, which can be state as: To develop a unified metallographic technique capable to show the microstructure of zircaloy in a reproducible and uniform manner. To fulfill the objective the following goals were established: A. To measure the grain size and perform an statistical treatment, in samples prepared specifically to show different amounts of cold work, recrystallization and grain growth. B. To compare the results obtained by the different laboratories involved in the programme. C. Finally, after the Ugine meeting, also the determination of the recrystallization and grain growth kinetics. (Author)

  20. HERBE final safety report; HERBE Finalni sigurnosni izvestaj

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-07-01

    The Final safety report of HERBE system constructed at the RB reactor consists of 13 chapters, as follows. Chapter 0 includes a summary and the contents of the Final safety report, fundamental characteristics of the system and conclusion remarks, with the license agreement of the Safety Committee of the Boris Kidric Institute. Chapter 1 describes and analyzes the site of the HERBE system, including demography, topography, meteorology, hydrology, geology, seismicity, ecology. Chapter 3 covers technical characteristics of the system, Chapter 4 deals with safety analysis, Chapter 5 describes organisation of construction and preliminary operational testing of the system. Chapter 6 deals with organisation and program of test and regular operation, relevant procedures. Chapter 7 defines operational conditions and constraints, Chapter 8 and describe methods and means of radiation protection and radioactive materials management respectively. Chapter 10 contains a review of emergency plans, measures and procedures for nuclear accident protection. Chapters 11 and 12 are concerned with quality assurance program and physical protection of the HERBE system and related nuclear material.

  1. 23 CFR 635.121 - Contract time and contract time extensions.

    Science.gov (United States)

    2010-04-01

    ... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.121 Contract time and contract time extensions. (a) The STD should have adequate written procedures for the determination of contract... 23 Highways 1 2010-04-01 2010-04-01 false Contract time and contract time extensions. 635.121...

  2. LYNX community advocacy & service engagement (CASE) project final report.

    Science.gov (United States)

    2009-05-14

    This report is a final assessment of the Community Advocacy & Service Engagement (CASE) project, a LYNX-FTA research project designed : to study transit education and public engagement methods in Central Florida. In the Orlando area, as in other part...

  3. Muscle contraction analysis with MRI image

    International Nuclear Information System (INIS)

    Horio, Hideyuki; Kuroda, Yoshihiro; Imura, Masataka; Oshiro, Osamu

    2010-01-01

    The MRI measurement has been widely used from the advantage such as no radiation exposure and high resolution. In various measurement objects, the muscle is used for a research and clinical practice. But it was difficult to judge static state of a muscle contraction. In this study, we focused on a proton density change by the blood vessel pressure at the time of the muscle contraction, and aimed the judgments of muscle contraction from variance of the signal intensity. First, the background was removed from the measured images. Second, each signal divided into the low signal side and the high signal side, and variance values (σ H , σ L ) and the ratio (μ) were calculated. Finally, Relax and strain state ware judged from the ratio (μ). As a Result, in relax state, ratio (μ r ) was 0.9823±0.06133. And in strain state, ratio (μ s ) was 0.7547±0.10824. Therefore, a significant difference was obtained in relax state and strain state. Therefore, the strain state judgment of the muscle was possible by this study's method. (author)

  4. Energy conservation in coal conversion. Final report, September 15, 1977--September 1, 1978. Selected case studies and conservation methodologies

    Energy Technology Data Exchange (ETDEWEB)

    Purcupile, J.C.

    1978-09-01

    The purpose of this study is to apply the methodologies developed in the Energy Conservation in Coal Conversion August, 1977 Progress Report - Contract No. EY77S024196 - to an energy efficient, near-term coal conversion process design, and to develop additional, general techniques for studying energy conservation and utilization in coal conversion processes. The process selected for study was the Ralph M. Parsons Company of Pasadena, California ''Oil/Gas Complex, Conceptual Design/Economic Analysis'' as described in R and D Report No. 114 - Interim Report No. 4, published March, 1977, ERDA Contract No. E(49-18)-1975. Thirteen papers representing possible alternative methods of energy conservation or waste heat utilization have been entered individually into EDB and ERA. (LTN)

  5. WindWaveFloat (WWF): Final Scientific Report

    Energy Technology Data Exchange (ETDEWEB)

    Weinstein, Alla; Roddier, Dominique; Banister, Kevin

    2012-03-30

    Principle Power Inc. and National Renewable Energy Lab (NREL) have completed a contract to assess the technical and economic feasibility of integrating wave energy converters into the WindFloat, resulting in a new concept called the WindWaveFloat (WWF). The concentration of several devices on one platform could offer a potential for both economic and operational advantages. Wind and wave energy converters can share the electrical cable and power transfer equipment to transport the electricity to shore. Access to multiple generation devices could be simplified, resulting in cost saving at the operational level. Overall capital costs may also be reduced, provided that the design of the foundation can be adapted to multiple devices with minimum modifications. Finally, the WindWaveFloat confers the ability to increase energy production from individual floating support structures, potentially leading to a reduction in levelized energy costs, an increase in the overall capacity factor, and greater stability of the electrical power delivered to the grid. The research conducted under this grant investigated the integration of several wave energy device types into the WindFloat platform. Several of the resulting system designs demonstrated technical feasibility, but the size and design constraints of the wave energy converters (technical and economic) make the WindWaveFloat concept economically unfeasible at this time. Not enough additional generation could be produced to make the additional expense associated with wave energy conversion integration into the WindFloat worthwhile.

  6. Final Report. Novel Behavior of Ferromagnet/Superconductor Hybrid Systems

    International Nuclear Information System (INIS)

    Birge, Norman

    2016-01-01

    Final report for grant DE-FG02-06ER46341. This work has produced a most convincing experimental demonstration that spin-triplet supercurrent can appear in Josephson junctions containing ferromagnetic materials, even when the superconducting electrodes are conventional, spin-singlet superconductors.

  7. Final Report. Novel Behavior of Ferromagnet/Superconductor Hybrid Systems

    Energy Technology Data Exchange (ETDEWEB)

    Birge, Norman [Michigan State Univ., East Lansing, MI (United States)

    2016-09-26

    Final report for grant DE-FG02-06ER46341. This work has produced a most convincing experimental demonstration that spin-triplet supercurrent can appear in Josephson junctions containing ferromagnetic materials, even when the superconducting electrodes are conventional, spin-singlet superconductors.

  8. IRIS Toxicological Review of Vinyl Chloride (Final Report, 2000)

    Science.gov (United States)

    EPA is announcing the release of the final report, Toxicological Review of Vinyl Chloride: in support of the Integrated Risk Information System (IRIS). The updated Summary for Vinyl Chloride and accompanying Quickview have also been added to the IRIS Database.

  9. Contracting for independent evaluation: approaches to an inherent tension.

    Science.gov (United States)

    Klerman, Jacob Alex

    2010-08-01

    There has recently been discussion of whether independent contract evaluation is possible. This article acknowledges the inherent tension in contract evaluation and in response suggests a range of constructive approaches to improving the independence of contract evaluation. In particular, a clear separation between the official evaluation report and a contractor's own publication of analysis from the underlying evaluation appears to be a promising approach. In this approach, the funder would retain almost unfettered rights to the official contract report (including the right never to publish but not the right to change the contractor's text while leaving the contractor's authorship) and the contractor would retain clearly defined rights to publish any findings from the evaluation (subject only to the limitations of human subjects and proprietary data and some minimal notice).

  10. Climate and Land Use Change Effects on Ecological Resources in Three Watersheds: A Synthesis Report (Final Report)

    Science.gov (United States)

    EPA announced the availability of the final report, Climate and Land-Use Change Effects on Ecological Resources in Three Watersheds: A Synthesis Report. This report provides a summary of climate change impacts to selected watersheds and recommendations for how to improv...

  11. ROLL OUT THE TALENT : Final project report

    OpenAIRE

    Eerola, Tuomas; Tuominen, Pirjo; Hakkarainen, Riitta-Liisa; Laurikainen, Marja; Mero, Niina

    2014-01-01

    The ROLL OUT THE TALENT project was born out of the desire to recognise and support the strengths of vocational students and to develop new and innovative operating models. ROLL OUT THE TALENT promoted regional cooperation between institutes and companies. The project produced operating and study path models that take into consideration the individual strengths of vocational students and the principles of lifelong learning. This is the final report of the ROLL OUT THE TALENT project, and ...

  12. Validation of Numerical Two-Fluid and Kinetic Plasma Models. Final Report

    International Nuclear Information System (INIS)

    Barnes, Daniel

    2011-01-01

    This was a four year grant commencing October 1, 2003 and finishing September 30, 2007. The funding was primarily used to support the work of the Principal Investigator, who collaborated with Profs. Scott Parker and John Cary at U. Colorado, and with two students, N. Xiang and J. Cheng also of U. Colorado. The technical accomplishments of this grant can be found in the publications listed in the final Section here. The main accomplishments of the grant work were: (1) Development and implementation of time-implicit two-fluid simulation methods in collaboration with the NIMROD team; and (2) Development and testing of a new time-implicit delta-f, energy-conserving method The basic two-fluid method, with many improvements is used in present NIMROD calculations. The energy-conserving delta-f method is under continuing development under contract between Coronado Consulting, a New Mexico sole proprietorship and the Oak Ridge National Laboratory.

  13. AIMES Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Katz, Daniel S [Univ. of Illinois, Urbana-Champaign, IL (United States). National Center for Supercomputing Applications (NCSA); Jha, Shantenu [Rutgers Univ., New Brunswick, NJ (United States); Weissman, Jon [Univ. of Minnesota, Minneapolis, MN (United States); Turilli, Matteo [Rutgers Univ., New Brunswick, NJ (United States)

    2017-01-31

    This is the final technical report for the AIMES project. Many important advances in science and engineering are due to large-scale distributed computing. Notwithstanding this reliance, we are still learning how to design and deploy large-scale production Distributed Computing Infrastructures (DCI). This is evidenced by missing design principles for DCI, and an absence of generally acceptable and usable distributed computing abstractions. The AIMES project was conceived against this backdrop, following on the heels of a comprehensive survey of scientific distributed applications. AIMES laid the foundations to address the tripartite challenge of dynamic resource management, integrating information, and portable and interoperable distributed applications. Four abstractions were defined and implemented: skeleton, resource bundle, pilot, and execution strategy. The four abstractions were implemented into software modules and then aggregated into the AIMES middleware. This middleware successfully integrates information across the application layer (skeletons) and resource layer (Bundles), derives a suitable execution strategy for the given skeleton and enacts its execution by means of pilots on one or more resources, depending on the application requirements, and resource availabilities and capabilities.

  14. The Michigan high-level radioactive waste program: Final technical progress report

    International Nuclear Information System (INIS)

    1987-01-01

    This report comprises the state of Michigan's final technical report on the location of a proposed high-level radioactive waste disposal site. Included are a list of Michigan's efforts to review the DOE proposal and a detailed report on the application of geographic information systems analysis techniques to the review process

  15. Final report

    DEFF Research Database (Denmark)

    Badger, Merete; Monaco, Lucio; Fransson, Torsten

    2013-01-01

    This report represents the deliverable D1.2 of project Virtual Campus Hub. The project runs from October 2011 to September 2013. The report is the core of the project’s 2nd periodic report, which was submitted to the European Commission on November 4th, 2013.......This report represents the deliverable D1.2 of project Virtual Campus Hub. The project runs from October 2011 to September 2013. The report is the core of the project’s 2nd periodic report, which was submitted to the European Commission on November 4th, 2013....

  16. Additional EIPC Study Analysis. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Hadley, Stanton W [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Gotham, Douglas J. [Purdue Univ., West Lafayette, IN (United States); Luciani, Ralph L. [Navigant Consultant Inc., Suwanee, GA (United States)

    2014-12-01

    Between 2010 and 2012 the Eastern Interconnection Planning Collaborative (EIPC) conducted a major long-term resource and transmission study of the Eastern Interconnection (EI). With guidance from a Stakeholder Steering Committee (SSC) that included representatives from the Eastern Interconnection States Planning Council (EISPC) among others, the project was conducted in two phases. Phase 1 involved a long-term capacity expansion analysis that involved creation of eight major futures plus 72 sensitivities. Three scenarios were selected for more extensive transmission- focused evaluation in Phase 2. Five power flow analyses, nine production cost model runs (including six sensitivities), and three capital cost estimations were developed during this second phase. The results from Phase 1 and 2 provided a wealth of data that could be examined further to address energy-related questions. A list of 14 topics was developed for further analysis. This paper brings together the earlier interim reports of the first 13 topics plus one additional topic into a single final report.

  17. SENTINEL trademark technical basis report for Limerick. Final report

    International Nuclear Information System (INIS)

    Burns, E.T.; Lee, L.K.; Mitman, J.T.; Vanover, D.E.; Wilson, D.K.

    1997-12-01

    PECO Energy in cooperation with the Electric Power Research Institute (EPRI) installed the SENTINEL trademark software at its Limerick Generating Station. This software incorporates models of the safety and support systems which are used to display the defense in depth present in the plant and a quantitative assessment of the plant risks during proposed on-line maintenance. During the past year, PECO Energy personnel have used this display to evaluate the safety of proposed on-line maintenance schedules. The report describes the motivation for and the development of the SENTINEL software. It describes the generation of Safety Function Assessment Trees and Plant Transient Assessment Trees and their use in evaluating the level of defense-in-depth of key plant safety functions and the susceptibility of the plant to critical transient events. Their results are displayed by color indicators ranging from green, through yellow and orange to red to show increasingly hazardous conditions. The report describes the use of the Limerick Probabilistic Safety Assessment within the SENTINEL code to calculate an instantaneous core damage frequency and the criteria by which this frequency is translated to a color indicator. Finally, the report describes the Performance Criteria Assessment which tracks and trends system/train unavailability to document conformance to the requirements of the Maintenance Rule

  18. CONTINGENCY CONTRACTING: DOD, State, and USAID Contracts and Contractor Personnel in Iraq and Afghanistan

    National Research Council Canada - National Science Library

    Hutton, John; Ayers, Johana R; Berkholtz, Jessica M; Brandon, E; Culley, Brendan S; James, Jr., Art; McMillen, Lisa A; McSween, Jean; Thornton, Karen

    2008-01-01

    DOD, State, and USAID reported that they obligated at least $33.9 billion during fiscal year 2007 and the first half of fiscal year 2008 on 56,925 contracts with performance in either Iraq or Afghanistan...

  19. Final voluntary release assessment/corrective action report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-12

    The US Department of Energy, Carlsbad Area Office (DOE-CAO) has completed a voluntary release assessment sampling program at selected Solid Waste Management Units (SWMUs) at the Waste Isolation Pilot Plant (WIPP). This Voluntary Release Assessment/Corrective Action (RA/CA) report has been prepared for final submittal to the Environmental protection Agency (EPA) Region 6, Hazardous Waste Management Division and the New Mexico Environment Department (NMED) Hazardous and Radioactive Materials Bureau to describe the results of voluntary release assessment sampling and proposed corrective actions at the SWMU sites. The Voluntary RA/CA Program is intended to be the first phase in implementing the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) and corrective action process at the WIPP. Data generated as part of this sampling program are intended to update the RCRA Facility Assessment (RFA) for the WIPP (Assessment of Solid Waste Management Units at the Waste Isolation Pilot Plant), NMED/DOE/AIP 94/1. This Final Voluntary RA/CA Report documents the results of release assessment sampling at 11 SWMUs identified in the RFA. With this submittal, DOE formally requests a No Further Action determination for these SWMUs. Additionally, this report provides information to support DOE`s request for No Further Action at the Brinderson and Construction landfill SWMUs, and to support DOE`s request for approval of proposed corrective actions at three other SWMUs (the Badger Unit Drill Pad, the Cotton Baby Drill Pad, and the DOE-1 Drill Pad). This information is provided to document the results of the Voluntary RA/CA activities submitted to the EPA and NMED in August 1995.

  20. Final report on a study of coherence in acceptability criteria for the technical aspects of risks associated with potentially hazardous installations

    International Nuclear Information System (INIS)

    Chicken, J.C.

    1988-01-01

    This report describes the results of the study that was made, under Contract No ECI-1390-B7221-85D, for the European Atomic Energy Community. The aim of the study was to examine and assess the feasibility of developing coherent and uniform criteria for judging the acceptability of the technical aspects of the risks associated with potentially hazardous installations. The report is arranged in five main parts. First the nature of hazardous installations is considered and this provides the basis for examination of the currently-used technical risk acceptability criteria. Next, the possible forms of criteria are explored and then universally consistent partial and overall technical risk acceptability criteria are proposed. Following this the implications of using the criteria proposed at the design, regulatory and operating levels are examined. Then, by testing the criteria against some real decisions, the practical problems of using the proposed criteria are explored. This leads to consideration of possible alternatives to the proposed criteria. Finally the conclusions that appear to be justified are summarized and the need for further work is identified

  1. Space tug applications. Final report

    International Nuclear Information System (INIS)

    1996-01-01

    This article is the final report of the conceptual design efforts for a 'space tug'. It includes preliminary efforts, mission analysis, configuration analysis, impact analysis, and conclusions. Of the several concepts evaluated, the nuclear bimodal tug was one of the top candidates, with the two options being the NEBA-1 and NEBA-3 systems. Several potential tug benefits were identified during the mission analysis. The tug enables delivery of large (>3,500 kg) payloads to the outer planets and it increases the GSO delivery capability by 20% relative to current systems. By providing end of life disposal, the tug can be used to extend the life of existing space assets. It can also be used to reboost satellites which were not delivered to their final orbit by the launch system. A specific mission model is the key to validating the tug concept. Once a mission model can be established, mission analysis can be used to determine more precise propellant quantities and burn times. In addition, the specific payloads can be evaluated for mass and volume capability with the launch systems. Results of the economic analysis will be dependent on the total years of operations and the number of missions in the mission model. The mission applications evaluated during this phase drove the need for large propellant quantities and thus did not allow the payloads to step down to smaller and less expensive launch systems

  2. Integrated Science Assessment (ISA) for Sulfur Oxides – Health Criteria (Final Report, Sep 2008)

    Science.gov (United States)

    EPA announced the availability of the final report, Integrated Science Assessment (ISA) for Sulfur Oxides – Health Criteria final assessment. This report represents a concise synthesis and evaluation of the most policy-relevant science and will ultimately provide the scien...

  3. Reservoir characterization of Pennsylvanian sandstone reservoirs. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Kelkar, M.

    1995-02-01

    This final report summarizes the progress during the three years of a project on Reservoir Characterization of Pennsylvanian Sandstone Reservoirs. The report is divided into three sections: (i) reservoir description; (ii) scale-up procedures; (iii) outcrop investigation. The first section describes the methods by which a reservoir can be described in three dimensions. The next step in reservoir description is to scale up reservoir properties for flow simulation. The second section addresses the issue of scale-up of reservoir properties once the spatial descriptions of properties are created. The last section describes the investigation of an outcrop.

  4. Probabilistic risk assessment (PRA) reference document. Final report

    International Nuclear Information System (INIS)

    Murphy, J.A.

    1984-09-01

    This document describes the current status of probabilistic risk assessment (PRA) as practiced in the nuclear reactor regulatory process. The PRA studies that have been completed or are under way are reviewed. The levels of maturity of the methodologies used in a PRA are discussed. Insights derived from PRAs are listed. The potential uses of PRA results for regulatory purposes are discussed. This document was issued for comment in February 1984 entitled Probabilistic Risk Assessment (PRA): Status Report and Guidance for Regulatory Application. The comments received on the draft have been considered for this final version of the report

  5. Final Technical Report, Wind Generator Project (Ann Arbor)

    Energy Technology Data Exchange (ETDEWEB)

    Geisler, Nathan [City of Ann Arbor, MI (United States)

    2017-03-20

    A Final Technical Report (57 pages) describing educational exhibits and devices focused on wind energy, and related outreach activities and programs. Project partnership includes the City of Ann Arbor, MI and the Ann Arbor Hands-on Museum, along with additional sub-recipients, and U.S. Department of Energy/Office of Energy Efficiency and Renewable Energy (EERE). Report relays key milestones and sub-tasks as well as numerous graphics and images of five (5) transportable wind energy demonstration devices and five (5) wind energy exhibits designed and constructed between 2014 and 2016 for transport and use by the Ann Arbor Hands-on Museum.

  6. TMI-2 Lessons Learned Task Force. Final report

    International Nuclear Information System (INIS)

    1979-10-01

    In its final report reviewing the Three Mile Island accident, the TMI-2 Lessons Learned Task Force has suggested change in several fundamental aspects of basic safety policy for nuclear power plants. Changes in nuclear power plant design and operations and in the regulatory process are discussed in terms of general goals. The appendix sets forth specific recommendations for reaching these goals

  7. Final Report Technetium Monitor

    International Nuclear Information System (INIS)

    Spencer, W.A.

    2003-01-01

    The Hanford River Protection Project Waste Treatment Plant (WTP) is required by the current contract to remove radioactive technetium FR-om stored caustic nuclear waste solutions. The Savannah River Technology Center (SRTC) has worked with typical envelopes of these wastes to optimize the removal process. To support the studies, SRTC developed a rapid on-line remote analyzer to monitor technetium and rhenium levels in solutions as well as track other metals in the solutions through the process operations. Rhenium was used as a non-radioactive substitute for technetium in process development studies. The remote monitor was based on inductively coupled plasma emission spectroscopy (ICPES). Fiber optic cable and extended RF cabling removed the plasma source FR-om the spectrometer and instrument electronics

  8. Medical waste irradiation study. Final report

    International Nuclear Information System (INIS)

    Adler, R.J.; Stein, J.; Nygard, J.

    1998-01-01

    The North Star Research Corporation Medical Waste project is described in this report, with details of design, construction, operation, and results to date. The project began with preliminary design of the accelerator. The initial design was for a single accelerator chamber with a vacuum tube cavity driver built into the chamber itself, rather than using a commercial tube separate from the RF accelerator. The authors believed that this would provide more adjustability and permit better coupling to be obtained. They did not have sufficient success with that approach, and finally completed the project using a DC accelerator with a unique new scanning system to irradiate the waste

  9. Medical waste irradiation study. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Adler, R.J.; Stein, J. [North Star Research Corp., Albuquerque, NM (United States); Nygard, J. [Advance Bio-Control (United States)

    1998-07-25

    The North Star Research Corporation Medical Waste project is described in this report, with details of design, construction, operation, and results to date. The project began with preliminary design of the accelerator. The initial design was for a single accelerator chamber with a vacuum tube cavity driver built into the chamber itself, rather than using a commercial tube separate from the RF accelerator. The authors believed that this would provide more adjustability and permit better coupling to be obtained. They did not have sufficient success with that approach, and finally completed the project using a DC accelerator with a unique new scanning system to irradiate the waste.

  10. Final Scientific Report: DE-SC0002194

    Energy Technology Data Exchange (ETDEWEB)

    Seidler, Gerald [Univ. of Washington, Seattle, WA (United States)

    2017-04-07

    We provide the final scientific report for DE-SC0002194. During the term of this grant, 28 publications spanning a variety of topics were addressed under the rubric of advanced x-ray methods and their application to extreme conditions of time-resolution or x-ray intensities. Notable accomplishments include a new observation of XANES features associated with f-shell reconfiguration in lanthanides, size-dependent x-ray heating effects under XFEL illumination conditions, theoretical development of improved treatments of inelastic x-ray scattering for 'warm dense matter' conditions, and several new instrument develop efforts for atomic, molecular, and condensed phase studies in the lab and at major facility lightsources.

  11. Solar thermal repowering systems integration. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Dubberly, L. J.; Gormely, J. E.; McKenzie, A. W.

    1979-08-01

    This report is a solar repowering integration analysis which defines the balance-of-plant characteristics and costs associated with the solar thermal repowering of existing gas/oil-fired electric generating plants. Solar repowering interface requirements for water/steam and salt or sodium-cooled central receivers are defined for unit sizes ranging from 50 MWe non-reheat to 350 MWe reheat. Finally balance-of-plant cost estimates are presented for each of six combinations of plant type, receiver type and percent solar repowering.

  12. 32 CFR 767.9 - Content of permit holder's final report.

    Science.gov (United States)

    2010-07-01

    ... RULES APPLICATION GUIDELINES FOR ARCHEOLOGICAL RESEARCH PERMITS ON SHIP AND AIRCRAFT WRECKS UNDER THE.... The permit holder's final report shall include the following: (a) A site history and a contextual...

  13. Mathematics Intensive Summer Session (MISS). Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-01

    This final technical report appears in two parts: the report for the 1995 summer MISS program and the report for the 1996 summer MISS program. Copies of the US Department of Energy Pre-Freshman Enrichment Program 1995 Entry Form and 1996 Entry Form completed by all participants were sent to the Oak Ridge Institute for Science and Education in the fall of 1995 and 1996 respectively. Those forms are on file should they be needed. Attached also is a copy of the Summary of ideas for panel discussions, problem-solving sessions, or small group discussions presented at the Department of Energy Oak Ridge Institute for Science and Education Pre-Freshman Enrichment Program Project Directors Meeting held in San Antonio, TX, November 12--14, 1995.

  14. Continued development of modeling tools and theory for rf heating. Final report

    International Nuclear Information System (INIS)

    Smithe, D.N.

    1998-01-01

    The work performed during the grant has been reported long before this date, specifically in: (1) the grant's annual performance report for 1991, MRC/WDC-R-277; (2) the published AIP Conference Proceedings number-sign 244, Radio Frequency Power in Plasmas, Charleston, SC 1991, ''Evaluation of Wave Dispersion, Mode-Conversion, and Damping for ECRH with Exact Relativistic Corrections,'' by D.N. Smithe and P.L. Colestock; and (3) an unpublished paper entitled ''Temperature Anisotropy and Rotation Upgrades to the ICRF Modules in SNAP and TRANSP'', presented at the 1992 ICRF Modeling and Theory Workshop, at the Princeton Plasma Physics Laboratory. This final report contains copies of number (1). The specifics of the grant's final months' activities, which to the authors recollection have never been reported to the DOE, are as follows. The original grant, which was to terminate August 15, 1991, was extended without additional funds to October 31, 1992. The primary reason for the extension was to permit attendance at the 1992 ICRF Modeling and Theory Workshop at the Princeton Plasma Physics Laboratory (PPPL), which was finally held August 17--18, 1992, after having been rescheduled several times during the summer of 1992. The body of this report contains copies of the 1991 annual report, which gives detailed discussion of the work accomplished

  15. Route 139 rehabilitation : Pulaski Skyway contract 2 : final report.

    Science.gov (United States)

    2017-06-01

    After being outside and exposed to the elements during many years of service, concrete and the reinforcement within begins to deteriorate and corrode, which affects the performance of concrete bridge balustrades, especially those built in the 1930...

  16. CONSIDERATION ON THE LEGAL REGIME APPLICABLE TO INTERNATIONAL TOURISM CONTRACTS

    Directory of Open Access Journals (Sweden)

    Serban-Alexandru STANESCU

    2017-07-01

    Full Text Available Upon conclusion of an international tourism contract, the contracting parties - one of which (the beneficiary acts as the consumer – are facing legal difficulties, which are addressed by this study from the perspective of the interference between the national law and the European Union law. Thus, one of the primary issues considered herein is that concerning the determination of the applicable law based on which the rights and obligations of the contracting parties are to be established. Secondly, this study examines the applicable procedural rules in the case where a Romanian court is requested to settle a dispute arising from an international tourism contract. Finally, the study deals with the hypothesis where a dispute arising from such a contract is settled by a foreign court, and in particular with the effects of the judgment given by the foreign court on the territory of Romania. The above mentioned issues are the grounds behind this research on the legal status of international tourism contracts, in addition to the fact that, despite the rich contractual practice in the field under consideration, the amount of specialized literature on this subject is rather limited.

  17. Report on Evaluation of Tender for the Valentine Iron Ore Project in Uruguay

    International Nuclear Information System (INIS)

    1981-01-01

    This report prepared by Dastur Engineering International GmbH (DEI)Consulting Engineers, Dusseldorf at the instance of United Nations Industrial Development Organization (UNIDO) seeks to present an evaluation of the feasibility study presented by Republica Oriental del Uruguay, Ministerio de Industria y- Energia (Project Authority) by the Brazilian Consortium (comprising Tenenga, Coferraz, Cimetal and Interbras) along with a project BID including financing possibilities. In accordance with the contract requirements, this Draft Final Report is being submitted. Based on the comments to be received on the findings incorporated in this Draft Final Report from UNIDO and Project Authorities in Uruguay, the Final Report will be prepared and submitted to UNIDO in accordance with the time schedule stipulated in the contract between UNIDO and DEI. The aims of the Project are:a) The development objective is the utilisation of the country's natural resources by exploiting the iron ore deposits of Valentines, for iron and steel production. b)The immediate objective is to evaluate the tenders for the execution of a project to undertake the industrial exploitation of the iron or deposits in close co-operation and co-ordination with the Uruguayan authorities.

  18. Bioengineering aspects of inorganic carbon supply to mass algal cultures. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Goldman, J.C.

    1980-06-01

    The work included in this report is part of an ongoing study (currently funded by the Solar Energy Research Institute - Subcontract No. XR-9-8144-1) on the inorganic carbon requirements of microalgae under mass culture conditions and covers the period June 1, 1978 through May 31, 1979. It is divided into two parts appended herein. The first part is a literature review on the inorganic carbon chemical system in relation to algal growth requirements, and the second part deals with the kinetics of inorganic carbon-limited growth of two freshwater chlorophytes including the effect of carbon limitation on cellular chemical composition. Additional experiment research covered under this contract was reported in the Proceedings of the 3rd Annual Biomass Energy Systems Conferences, pp. 25-32, Bioengineering aspects of inorganic carbon supply to mass algal cultures. Report No. SERI/TP-33-285.

  19. The Remote Security Station (RSS) final report

    International Nuclear Information System (INIS)

    Pletta, J.B.; Amai, W.A.; Klarer, P.; Frank, D.; Carlson, J.; Byrne, R.

    1992-10-01

    The Remote Security Station (RSS) was developed by Sandia National Laboratories for the Defense Nuclear Agency to investigate issues pertaining to robotics and sensor fusion in physical security systems. This final report documents the status of the RSS program at its completion in April 1992. The RSS system consists of the Man Portable Security Station (MaPSS) and the Telemanaged Mobile Security Station (TMSS), which are integrated by the Operator's Control Unit (OCU) into a flexible exterior perimeter security system. The RSS system uses optical, infrared, microwave, and acoustic intrusion detection sensors in conjunction with sensor fusion techniques to increase the probability of detection and to decrease the nuisance alarm rate of the system. Major improvements to the system developed during the final year are an autonomous patrol capability, which allows TMSS to execute security patrols with limited operator interaction, and a neural network approach to sensor fusion, which significantly improves the system's ability to filter out nuisance alarms due to adverse weather conditions

  20. Energy efficiency of computer power supply units - Final report

    Energy Technology Data Exchange (ETDEWEB)

    Aebischer, B. [cepe - Centre for Energy Policy and Economics, Swiss Federal Institute of Technology Zuerich, Zuerich (Switzerland); Huser, H. [Encontrol GmbH, Niederrohrdorf (Switzerland)

    2002-11-15

    This final report for the Swiss Federal Office of Energy (SFOE) takes a look at the efficiency of computer power supply units, which decreases rapidly during average computer use. The background and the purpose of the project are examined. The power supplies for personal computers are discussed and the testing arrangement used is described. Efficiency, power-factor and operating points of the units are examined. Potentials for improvement and measures to be taken are discussed. Also, action to be taken by those involved in the design and operation of such power units is proposed. Finally, recommendations for further work are made.

  1. National Computational Infrastructure for Lattice Gauge Theory: Final Report

    International Nuclear Information System (INIS)

    Richard Brower; Norman Christ; Michael Creutz; Paul Mackenzie; John Negele; Claudio Rebbi; David Richards; Stephen Sharpe; Robert Sugar

    2006-01-01

    This is the final report of Department of Energy SciDAC Grant ''National Computational Infrastructure for Lattice Gauge Theory''. It describes the software developed under this grant, which enables the effective use of a wide variety of supercomputers for the study of lattice quantum chromodynamics (lattice QCD). It also describes the research on and development of commodity clusters optimized for the study of QCD. Finally, it provides some high lights of research enabled by the infrastructure created under this grant, as well as a full list of the papers resulting from research that made use of this infrastructure

  2. Using contract mechanisms to coordinate product line decisions

    NARCIS (Netherlands)

    Nalla, V.R.; Venugopal, V.; Veen, van der J.A.A.

    2008-01-01

    In this paper we design contract mechanisms to increase the efficiency of product line decisions in a Supply Chain (SC). A two stage SC with a buyer and the supplier is considered. The end consumers are comprised of two segments with different willingness to pay. The final demand and the segments’

  3. Standard form contracts and a smart contract future

    Directory of Open Access Journals (Sweden)

    Kristin B. Cornelius

    2018-05-01

    Full Text Available With a budding market of widespread smart contract implementation on the horizon, there is much conversation about how to regulate this new technology. Discourse on standard form contracts (SFCs and how they have been adopted in a digital environment is useful toward predicting how smart contracts might be interpreted. This essay provides a critical review of the discourse surrounding digitised SFCs and applies it to issues in smart contract regulation. An exploration of the literature surrounding specific instances SFCs finds that it lacks a close examination of the textual and documentary aspects of SFCs, which are particularly important in a digital environment as a shift in medium prompts a different procedural process. Instead, common perspectives are either based on outdated notions of paper versions of these contracts or on ideologies of industry and business that do not sufficiently address the needs of consumers/users in the digital age. Most importantly, noting the failure of contract law to address the inequities of SFCs in this environment can help prevent them from being codified further with smart contracts.

  4. U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies

    Science.gov (United States)

    2011-11-07

    Report No. DODIG-2012-017 November 7, 2011 U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies...Contracting and Gift Policies 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK...HERITAGE AND HISTORY COMMAND SUBJECT: U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies (Report No. DODIG-2012-017) We are

  5. Renewable Energy Feasibility Study Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Rooney, Tim [Antares Group Inc.

    2013-10-30

    The Gila River Indian Community (GRIC or the Community) contracted the ANTARES Group, Inc. (“ANTARES”) to assess the feasibility of solar photovoltaic (PV) installations. A solar energy project could provide a number of benefits to the Community in terms of potential future energy savings, increased employment, environmental benefits from renewable energy generation and usage, and increased energy self-sufficiency. The study addresses a number of facets of a solar project’s overall feasibility, including: Technical appropriateness; Solar resource characteristics and expected system performance; Levelized cost of electricity (LCOE) economic assessment. The Gila River Indian Community (GRIC or the Community) contracted the ANTARES Group, Inc. (“ANTARES”) to prepare a biomass resource assessment study and evaluate the feasibility of a bioenergy project on Community land. A biomass project could provide a number of benefits to the Community in terms of increased employment, environmental benefits from renewable energy generation and usage, and increased energy self-sufficiency. The study addresses a number of facets of a biomass project’s overall feasibility, including: Resource analysis and costs; Identification of potential bioenergy projects; Technical and economic (levelized cost of energy) modeling for selected project configuration.

  6. The coordinating contracts of supply chain in a fuzzy decision environment.

    Science.gov (United States)

    Sang, Shengju

    2016-01-01

    The rapid change of the product life cycle is making the parameters of the supply chain models more and more uncertain. Therefore, we consider the coordination mechanisms between one manufacturer and one retailer in a fuzzy decision marking environment, where the parameters of the models can be forecasted and expressed as the triangular fuzzy variables. The centralized decision-making system, two types of supply chain contracts, namely, the revenue sharing contract and the return contract are proposed. To obtain their optimal policies, the fuzzy set theory is adopted to solve these fuzzy models. Finally, three numerical examples are provided to analyze the impacts of the fuzziness of the market demand, retail price and salvage value of the product on the optimal solutions in two contracts. It shows that in order to obtain more fuzzy expected profits the retailer and the manufacturer should seek as low fuzziness of demand, high fuzziness of the retail price and the salvage value as possible in both contracts.

  7. Esophageal contractions in type 3 achalasia esophagus: simultaneous or peristaltic?

    Science.gov (United States)

    Kim, Tae Ho; Patel, Nirali; Ledgerwood-Lee, Melissa; Mittal, Ravinder K

    2016-05-01

    Absence of peristalsis and impaired relaxation of lower esophageal sphincter are the hallmarks of achalasia esophagus. Based on the pressurization patterns, achalasia has been subdivided into three subtypes. The goal of our study was to evaluate the esophageal contraction pattern and bolus clearance in type 3 achalasia esophagus. High-resolution manometry (HRM) recordings of all patients diagnosed with achalasia esophagus in our center between the years 2011 and 2013 were reviewed. Recordings of 36 patients with type 3 achalasia were analyzed for the characteristics of swallow-induced "simultaneous esophageal contraction." The HRM impedance recordings of 14 additional patients with type 3 achalasia were analyzed for bolus clearance from the impedance recording. Finally, the HRM impedance along with intraluminal ultrasound imaging was conducted in six patients to further characterize the simultaneous esophageal contractions. Among 187 achalasia patients, 30 were type 1, 121 type 2, and 36 type 3. A total of 434 swallows evaluated in type 3 achalasia patients revealed that 95% of the swallow-induced contractions met criteria for simultaneous esophageal contraction, based on the onset of contraction. Interestingly, the peak and termination of the majority of simultaneous esophageal contractions were sequential. The HRM impedance revealed that 94% of the "simultaneous contractions" were associated with complete bolus clearance. Ultrasound image analysis revealed that baseline muscle thickness of patients in type 3 achalasia is larger than normal but the pattern of axial shortening is similar to that in normal subjects. The majority of esophageal contractions in type 3 achalasia are not true simultaneous contractions because the peak and termination of contraction are sequential and they are associated with complete bolus clearance.

  8. Building Information Modelling and Standardised Construction Contracts: a Content Analysis of the GC21 Contract

    Directory of Open Access Journals (Sweden)

    Aaron Manderson

    2015-08-01

    Full Text Available Building Information Modelling (BIM is seen as a panacea to many of the ills confronting the Architectural, Engineering and Construction (AEC sector. In spite of its well documented benefits the widespread integration of BIM into the project lifecycle is yet to occur. One commonly identified barrier to BIM adoption is the perceived legal risks associated with its integration, coupled with the need for implementation in a collaborative environment. Many existing standardised contracts used in the Australian AEC industry were drafted before the emergence of BIM. As BIM continues to become ingrained in the delivery process the shortcomings of these existing contracts have become apparent. This paper reports on a study that reviewed and consolidated the contractual and legal concerns associated with BIM implementation. The findings of the review were used to conduct a qualitative content analysis of the GC21 2nd edition, an Australian standardised construction contract, to identify possible changes to facilitate the implementation of BIM in a collaborative environment. The findings identified a number of changes including the need to adopt a collaborative contract structure with equitable risk and reward mechanisms, recognition of the model as a contract document and the need for standardisation of communication/information exchange.

  9. Chemical Profiles of Microalgae with Emphasis on Lipids: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Benemann, J. R.; Tillett, D. M.; Suen, Y.; Hubbard, J.; Tornabene, T. G.

    1986-02-01

    This final report details progress during the third year of this subcontract. The overall objective of this subcontract was two fold: to provide the analytical capability required for selecting microalgae strains with high energy contents and to develop fundamental knowledge required for optimizing the energy yield from microalgae cultures. The progress made towards these objectives during this year is detailed in this report.

  10. Operations-oriented performance measures for freeway management systems : final report.

    Science.gov (United States)

    2008-12-01

    This report describes the second and final year activities of the project titled Using Operations-Oriented Performance Measures to Support Freeway Management Systems. Work activities included developing a prototype system architecture for testi...

  11. Research on data analysis in the physical sciences. Final progress report, March 1973-November 1979

    Energy Technology Data Exchange (ETDEWEB)

    Tukey, J.W.; Bloomfield, P.

    1979-11-01

    In its most general terms, the work carried out under the contract consists of the development of new data analytic methods and the improvement of existing methods, their implementation on computer, especially minicomputers, and the development of non-statistical, systems-level software to support these activities. The work reported or completed is reviewed. (GHT)

  12. Towards future electricity networks - Final report

    Energy Technology Data Exchange (ETDEWEB)

    Papaemmanouil, A.

    2008-07-01

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) reviews work done on the development of new power transmission planning tools for restructured power networks. These are needed in order to face the challenges that arise due to economic, environmental and social issues. The integration of transmission, generation and energy policy planning in order to support a common strategy with respect to sustainable electricity networks is discussed. In the first phase of the project the main focus was placed on the definition of criteria and inputs that are most likely to affect sustainable transmission expansion plans. Models, concepts, and methods developed in order to study the impact of the internalisation of external costs in power production are examined. To consider external costs in the planning process, a concurrent software tool has been implemented that is capable of studying possible development scenarios. The report examines a concept that has been developed to identify congested transmission lines or corridors and evaluates the dependencies between the various market participants. The paper includes a set of three appendices that include a paper on the 28{sup th} USAEE North American conference, an abstract from Powertech 2009 and an SFOE report from July 2008.

  13. Towards future electricity networks - Final report

    International Nuclear Information System (INIS)

    Papaemmanouil, A.

    2008-01-01

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) reviews work done on the development of new power transmission planning tools for restructured power networks. These are needed in order to face the challenges that arise due to economic, environmental and social issues. The integration of transmission, generation and energy policy planning in order to support a common strategy with respect to sustainable electricity networks is discussed. In the first phase of the project the main focus was placed on the definition of criteria and inputs that are most likely to affect sustainable transmission expansion plans. Models, concepts, and methods developed in order to study the impact of the internalisation of external costs in power production are examined. To consider external costs in the planning process, a concurrent software tool has been implemented that is capable of studying possible development scenarios. The report examines a concept that has been developed to identify congested transmission lines or corridors and evaluates the dependencies between the various market participants. The paper includes a set of three appendices that include a paper on the 28 th USAEE North American conference, an abstract from Powertech 2009 and an SFOE report from July 2008.

  14. Cassandra - WP400 - final report of living lab 2

    NARCIS (Netherlands)

    Engler, M.; Klievink, A.J.

    2014-01-01

    This CASSANDRA LL2 final deliverable contains all information regarding the CASSANDRA Living Lab Europe – USA via Bremerhaven including information from two intermediate reports (CASSANDRA D4.21 and D4.22) about the very same Living Lab handed in during runtime of the Living Lab. CASSANDRA Living

  15. Washington State Nursing Home Administrator Model Curriculum. Final Report.

    Science.gov (United States)

    Cowan, Florence Kelly

    The course outlines presented in this final report comprise a proposed Fort Steilacoom Community College curriculum to be used as a statewide model two-year associate degree curriculum for nursing home administrators. The eight courses described are introduction to nursing, home administration, financial management of nursing homes, nursing home…

  16. DOE final technical report 3/1997 to 2/2005

    International Nuclear Information System (INIS)

    Gross, Franz L.

    2005-01-01

    DOE final technical report 3/1997 to 2/2005 This grant supported basic theoretical research into the derivation (from relativistic field theories) of relativistic equations for few body systems, with practical applications to the properties of 2 and 3 nucleon systems and to the nature of few-quark systems

  17. Irradiated uranium reprocessing, Final report - I-IV, Part III

    International Nuclear Information System (INIS)

    Gal, I.

    1961-12-01

    This third part of the final report include the following: Annex 5 - device for opening the cover; Annex 6 - inner part of the device for sampling of the radioactive solution; Annex 7 - outer part of the device for sampling of the radioactive solution; Annex 8 - pneumatic taps [sr

  18. Proof-of-Concept of the Phytoimmobilization Technology for TNX Outfall Delta: Final Report; FINAL

    International Nuclear Information System (INIS)

    Kaplan, D.I.

    2001-01-01

    A series of proof-of-principle studies was initiated to evaluate the soil remediation technology, phytoimmobilization, for application at the TNX Outfall Delta (TNX OD) operable unit. Phytoimmobilization involves two steps. The first step is entitled phytoextraction, and it takes place mostly during the spring and summer. During this step the plants extract contaminants from the sediment into the roots and then translocate the contaminants to the aboveground plant parts. The second step is referred to as sequestration and it takes place largely during the autumn and winter when annual plants senesce or deciduous trees drop their leaves. This step involves the immobilization of the contaminant once it leaches form the fallen leaves into a ''geomat,'' a geotextile embedded with mineral sequestering agents. This final report describes the results to date, including those reported in the status report (Kaplan et al. 2000a), those completed since the report was issued, and the preliminary calculations of the phytoimmobilization effectiveness

  19. IRIS Final Technical Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    M. D. Carelli

    2003-11-03

    OAK-B135 This NERI project, originally started as the Secure Transportable Autonomous Light Water Reactor (STAR-LW) and currently known as the International Reactor Innovative and Secure (IRIS) project, had the objective of investigating a novel type of water-cooled reactor to satisfy the Generation IV goals: fuel cycle sustainability, enhanced reliability and safety, and improved economics. The research objectives over the three-year (1999-2002) program were as follows: First year: Assess various design alternatives and establish main characteristics of a point design; Second year: Perform feasibility and engineering assessment of the selected design solutions; Third year: Complete reactor design and performance evaluation, including cost assessment These objectives were fully attained and actually they served to launch IRIS as a full fledged project for eventual commercial deployment. The program did not terminate in 2002 at the end of the NERI program, and has just entered in its fifth year. This has been made possible by the IRIS project participants which have grown from the original four member, two-countries team to the current twenty members, nine countries consortium. All the consortium members work under their own funding and it is estimated that the value of their in-kind contributions over the life of the project has been of the order of $30M. Currently, approximately 100 people worldwide are involved in the project. A very important constituency of the IRIS project is the academia: 7 universities from four countries are members of the consortium and five more US universities are associated via parallel NERI programs. To date, 97 students have worked or are working on IRIS; 59 IRIS-related graduate theses have been prepared or are in preparation, and 41 of these students have already graduated with M.S. (33) or Ph.D. (8) degrees. This ''final'' report (final only as far as the NERI program is concerned) summarizes the work performed

  20. ReACT Methodology Proof of Concept Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Bri Rolston; Sarah Freeman

    2014-03-01

    The Department of Energy’s Office of Electricity Delivery and Energy Reliability (DOE-OE) funded INL Researchers to evaluate a novel process for assessing and mitigating cyber security risks. The proof of concept level of the method was tested in an industry environment. This case study, plus additional case studies will support the further development of the method into a tool to assist industry in securing their critical networks. This report provides an understanding of the process developed in the Response Analysis and Characterization Tool (ReACT) project. This report concludes with lessons learned and a roadmap for final development of these tools for use by industry.

  1. Rational use of energy at the University of Stuttgart building environment. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, F.; Freihofer, H. [Forschungsinst. fuer Kerntechnik und Energiewandlung e.V., Stuttgart (Germany). Abt. Wissensverarbeitung und Numerik; Stergiaropoulos, K.; Claus, G. [Forschungsgesellschaft Heizung-Lueftung-Klimatechnik Stuttgart mbH (Germany); Harter, J.; Ast, H. [IFB, Dr. R. Braschel GmbH, Stuttgart (Germany); Will, M.; Haerther, H.; Franke, H. [Sulzer-Infra Deutschland GmbH, Stuttgart (Germany)

    1999-07-01

    We have demonstrated with the project REUSE that it is possible to optimise complex building ensembles (properties) energetically by applying the contracting model. However, there are some basic requirements which have to be fullfilled to reach such a goal. They include 1. basic consense among those dealing with specific aspects concerning energy use of the buildings considered, 2. transparent and most actual measured data of energy consumption, 3. unified and reliable system for evaluation of measures taken to save energy (base line), 4. partners who are able to define measures which have to be undertaken to save energy in a specific building and who are able to implement these measures effectively and user friendly. This report describes how we have fullfilled these requirements at the campus 'Pfaffenwald' of the University of Stuttgart. Numerous daily life difficulties had to be overcome before the project became a success and we were able to derive valuable consequences. These consequences went far beyond the original goal to save energy worth about 3 to 4 Million Deutsche Marks and finally resulted in a new thinking about energy use at the campus. Therefore, we see the project REUSE as extremely successful and hope it will encourage similar projects and provide valuable hints to them. (orig.) [German] Im Vorhaben REUSE wurde gezeigt, dass und wie es moeglich ist, komplexe Liegenschaften nach dem Contracting Modell energetisch zu optimieren. Voraussetzungen dafuer sind: 1. ein gemeinsames Basisverstaendnis all derer mit Energiefragen befassten, 2. eine transparente und zeitnahe Erfassung der Verbraeuche, 3. ein einheitliches und verlaessliches System zur Bewertung der Massnahmen zur Energieeinsparung (Baseline) und 4. Partner, die Massnahmen an Einzelobjekten effektiv und kundenfreundlich umsetzen koennen. Dieser Bericht zeigt auf, wie wir an der Liegenschaft CAMPUS Pfaffenwald der Universitaet Stuttgart diese Voraussetzungen geschaffen haben, wie die

  2. Final Environmental Impact Statement/Environmental Impact Report for continued operation of Lawrence Livermore National Laboratory and Sandia National Laboratories, Livermore

    International Nuclear Information System (INIS)

    1992-08-01

    This Environmental Impact Statement/Environmental Impact Report (EIS/EIR) is prepared pursuant to the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). This document analyzes the potential environmental impacts of the proposed action: continued operation, including near-term (within 5 to 10 years) proposed projects, of Lawrence Livermore National Laboratory (LLNL) and Sandia National Laboratories, Livermore (SNL, Livermore). Additionally, this document analyzes a no action alternative involving continuing operations at FY 1992 funding levels without further growth, a modification of operations alternative to reduce adverse environmental impacts of operations or facilities, and a shutdown and decommissioning alternative of UC discontinuing its management of LLNL after the current contract expires on September 30, 1992. This document assesses the environmental impacts of the Laboratories' operations on air and water quality, geological and ecological systems, occupational and public health risks, prehistoric and historic resources, endangered species, floodplains and wetlands, socioeconomic resources, hazardous waste management, site contamination, and other environmental issues. The EIS/EIR is divided into five volumes and two companion reports. This volume contains the Final EIS/EIR technical appendices which provide technical support for the analyses in Volume 1 and also provide additional information and references

  3. Report on the Audit of Foreign Direct Selling Costs

    Science.gov (United States)

    1990-09-18

    This is our final report on the Audit of Foreign Direct Selling Costs. The Contract Management Directorate made the audit from October 1989 to...The objective of the audit was to assess whether DoD regulations provided the appropriate incentives to stimulate exports by the. U.S. Defense

  4. Gasohol: economic feasibility study. Final report

    Energy Technology Data Exchange (ETDEWEB)

    David, M. L.; Hammaker, G. S.; Buzenberg, R. J.; Wagner, J. P.

    1978-07-01

    This report was prepared by Development Planning and Research Associates, Inc. under a contract with the Energy Research and Development Center of the University of Nebraska in cooperation with the Agricultural Products Industrial Utilization Committee and the State of Nebraska. Funding for this study was provided to the Energy Research and Development Center by the U.S. Department of Energy and the Old West Regional Commission. The primary objective of the study was to: determine the fiscal and market conditions under which the production of gasohol would be profitable for private producers. For purposes of this study, gasohol is a motor fuel consisting of 10 percent agriculturally-derived anhydrous ethanol and 90 percent unleaded gasoline. The study assumes that gasohol can be a fuel substitute for gasoline; indeed, the cost of gasoline will significantly influence that for gasohol. Gasoline prices are determined by factors external to ethanol; thus, the economic feasibility study of gasohol is in large part an economic feasibility study of fuel-grade ethanol production. More specifically, the study examined the following: the technical aspects of distributing, marketing, and using gasohol; the costs of the distribution and marketing of ethanol and gasohol; the energy balance of ethanol production; the cost of producing ethanol; the factors influencing ehtanol plant size and location; and the conditions that would make ethanol economicaly feasible for private producers.

  5. Wilsonville wastewater sampling program. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1983-10-01

    As part of its contrast to design, build and operate the SRC-1 Demonstration Plant in cooperation with the US Department of Energy (DOE), International Coal Refining Company (ICRC) was required to collect and evaluate data related to wastewater streams and wastewater treatment procedures at the SRC-1 Pilot Plant facility. The pilot plant is located at Wilsonville, Alabama and is operated by Catalytic, Inc. under the direction of Southern Company Services. The plant is funded in part by the Electric Power Research Institute and the DOE. ICRC contracted with Catalytic, Inc. to conduct wastewater sampling. Tasks 1 through 5 included sampling and analysis of various wastewater sources and points of different steps in the biological treatment facility at the plant. The sampling program ran from May 1 to July 31, 1982. Also included in the sampling program was the generation and analysis of leachate from SRC product using standard laboratory leaching procedures. For Task 6, available plant wastewater data covering the period from February 1978 to December 1981 was analyzed to gain information that might be useful for a demonstration plant design basis. This report contains a tabulation of the analytical data, a summary tabulation of the historical operating data that was evaluated and comments concerning the data. The procedures used during the sampling program are also documented.

  6. Contract Award Decisions Resulting in Contract Termination for Default

    National Research Council Canada - National Science Library

    1996-01-01

    .... Specifically, the audit focused on contracts terminated either for default or convenience and determined whether the contract terminations could have been averted based on information available before contract award...

  7. Far infrared studies of superconducting V3Si, Nb3Ge and Nb. Final report

    International Nuclear Information System (INIS)

    Perkowitz, S.

    1985-01-01

    Far infrared spectroscopy between 10 and 250 cm -1 is an effective probe of superconductivity because typical gap and phonon energies lie in this region. Between 1979 and 1985, this DOE contract supported far infrared research in homogeneous high-T/sub c/ superconductors and in granular superconductors. Results in both areas are summarized in this report

  8. Supersonic Post-Combustion Inertial CO2 Extraction System Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Balepin, Vladimir [Alliant Techsystems Operations LLC, Ronkonkoma, NY (United States)

    2017-04-05

    This report summarizes the effort carried out under NETL contract DE- FE0013122 from 1 October 2013 to 31 March 2017. As described in this document, technical challenges realized during the performance of this project resulted in completion of only the first two of three planned budget periods. Despite this outcome, substantial progress was made toward understanding and maturing the CO2 capture technology under consideration and considerable future promise remains for applications requiring lower CO2 capture and/or lower CO2.

  9. Hanford 100-N Area Tracer Study Final Report

    International Nuclear Information System (INIS)

    Kretzschmar, S.P.; Bedi, G.S.; Martinez, P.; Ervin, K.

    1996-09-01

    This document provides an engineering tracer study final report for the determination of contact time for the disinfection process at Group A Nontransient Noncommunity water treatment plant for the 100- N Water Plant (located on the Hanford Site in Richland, Washington). The purpose of this study is to determine the actual detention time within the plant clearwell, and the disinfection contact time at several clearwell effluent flow rates

  10. Final Technical Report for subcontract number B612144

    Energy Technology Data Exchange (ETDEWEB)

    Mayali, X. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Marcu, O. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-09-11

    The original statement of work stipulated that the Subcontractor shall perform bacterial and algal cultivation and manipulation, microbe isolation, preparation of samples for sequencing and isotopic analysis, data analysis, and manuscript preparation. The Subcontractor shall work closely with Dr. Mayali and other LLNL scientists, and shall participate in monthly SFA meetings (either in person or by telephone). The Subcontractor shall deliver a final report at the conclusion of the work.

  11. Natural gas market assessment: Long-term Canadian natural gas contracts

    International Nuclear Information System (INIS)

    1992-08-01

    A descriptive analysis is presented of the changes which have occurred and the developing trends in the long-term Canadian contracts governing the sale of western Canadian gas into the domestic and export markets from 1985 to 1991. The report is limited to domestic and export contracts for Canadian gas and does not include imported gas under contract. Contract structures prior to deregulation, the changing role of long-term contracts, size and duration of long-term contracts, and terms and conditions of long-term contracts are discussed. Important changes since the mid-1980s include: increased flexibility in long-term contracts enabling the parties to respond more readily to changing supply and demand conditions; greater balance between the buyer's obligation to purchase and the seller's obligation to deliver; flexible and increasingly simple pricing terms that track competitive market conditions; shorter contract terms; reduced contract volumes as smaller end-users and producer/marketers enter the market; and unbundling of gas sales and transportation service providing a wider range of contracting choices and options. 36 figs., 2 tabs

  12. Final report for tank 241-BX-104 push mode core 126 and 127

    International Nuclear Information System (INIS)

    Hu, T.A.

    1996-01-01

    This is the final sample analysis report for tank 241-BX-104 (BX-104), cores 126 and 127. Two segments from each core yielded a total of 11 samples which were analyzed. The data quality objectives (DQOs) applicable to this sampling event were the Safety Screening DQO (Dukelow et al. 1995) and the Organic Safety DQO (Turner et al. 1995). The samples were received, extruded and analyzed at PNNL 325 Analytical Chemistry Laboratory (ACL). The analyses were performed in accordance with the Sample Analysis Plan (Gretsinger 1996) and indicated that the tank is safe with respect to the criteria in the Safety Screening and Organic DQO. Detailed analytical results were described in the analytical laboratory 45-day Report (Attachment 1, WHC-SD-WM-DP-171, REV. 0) and final report (Attachment 2, PNL-BX-104 REV.1) prepared by PNNL, 325 Laboratory. Corrections and/or exceptions to the PNNL final report are provided

  13. Tritium research laboratory cleanup and transition project final report

    International Nuclear Information System (INIS)

    Johnson, A.J.

    1997-02-01

    This Tritium Research Laboratory Cleanup and Transition Project Final Report provides a high-level summary of this project's multidimensional accomplishments. Throughout this report references are provided for in-depth information concerning the various topical areas. Project related records also offer solutions to many of the technical and or administrative challenges that such a cleanup effort requires. These documents and the experience obtained during this effort are valuable resources to the DOE, which has more than 1200 other process contaminated facilities awaiting cleanup and reapplication or demolition

  14. The different approaches to the FM contract

    CERN Document Server

    Nonis, M

    2004-01-01

    In July 2002 a new strategy for the maintenance and operation of the surface installations and buildings and for the provision of services has been implemented with the start up of the â€ワFacilities Management” contract. After almost 2 years, the first main contractor has been replaced, the scope of the contract has been slightly modified and CERN responsible has modified the way the contract is managed in order to better adapt to the existing situation and to face and solve several strategic issues. During the same time, the boundary conditions, in particular the legal ones, have forced other modifications in the general strategy. This paper, after a general and brief introduction on the Facilities Management and its objectives, focuses on the differences among the original strategy, the experience with the first contractor and the present status with the actual one. Specific examples will also be mentioned to show the modifications and the adaptation to the new conditions. Finally, an overview on t...

  15. OPTICA: Our Path Together Initiating Cultural Access. Final Report.

    Science.gov (United States)

    Jackson, Susan, Comp.

    This final report describes the activities and outcomes of OPTICA (Our Path Together Initiating Cultural Access) programs. For each program an information sheet indicates the goal, total participation, status of the goal, and activities of the program. Programs included: (1) Hands On: ASL Creative Story Telling, a program that used children's…

  16. Entrepreneurship Education in the Arab States. Final Evaluation Report

    Science.gov (United States)

    Lamloumi, Jilani

    2013-01-01

    The report involves the findings of the final evaluation of the regional entrepreneurship education project in Arab States component II (2011-2012) (see ED560497), which is a joint activity between UNESCO and StratREAL Foundation. It aims to help the development of educational policies enabling the integration of entrepreneurship education within…

  17. U.S. LCI Database Project--Final Phase I Report

    Energy Technology Data Exchange (ETDEWEB)

    2003-08-01

    This Phase I final report reviews the process and provides a plan for the execution of subsequent phases of the database project, including recommended data development priorities and a preliminary cost estimate. The ultimate goal of the project is to develop publicly available LCI Data modules for commonly used materials, products, and processes.

  18. Nez Perce tribal hatchery project : combined-planning and design and operations and maintenance reports, annual report, 2000

    International Nuclear Information System (INIS)

    Larson, Roy Edward; Walker, Grant

    2002-01-01

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O and M) and Planning and Design (P and D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002

  19. Effective Classroom Management and Instruction: An Exploration of Models. Executive Summary of Final Report.

    Science.gov (United States)

    Evertson, Carolyn M.; And Others

    A summary is presented of the final report, "Effective Classroom Management and Instruction: An Exploration of Models." The final report presents a set of linked investigations of the effects of training teachers in effective classroom management practices in a series of school-based workshops. Four purposes were addressed by the study: (1) to…

  20. Final report for the 'Melt-Vessel Interactions' Project. European Union R and TD Program 4th Framework. MVI project final research report

    International Nuclear Information System (INIS)

    Sehgal, B.R.; Dinh, T.N.; Nourgaliev, R.R.; Bui, V.A.; Green, J.; Kolb, G.; Karbojian, A.; Theerthan, S.A.; Gubaidulline, A.; Bonnet, J.M.; Rouge, S.; Narcoux, M.; Liegeois, A.; Turland, B.D.; Dobson, G.P.; Siccama, A.; Ikonen, K.; Parozzi, F.; Kolev, N.; Caira, M.

    1999-04-01

    The Melt Vessel Interaction (MVI) project is concerned with the consequences of the interactions that a core melt, generated during a postulated severe accident in a light water reactor, may have with the pressure vessel. In particular, the issues concerned with the failure of the vessel bottom head are the focus of the research. The specific objectives of the project are to obtain data and develop validated models, which could be applied to prototypic plants, and accident conditions, for resolution of issues related to the melt vessel interactions. The project work has been performed by nine partners having varied responsibility. The work included a large number of experiments, with simulant materials, whose observations and results are employed, respectively, to understand the physical mechanisms and to develop validated models. Applications to the prototypic geometry and conditions have also been performed. This report is volume 1 of the Final Report for the Project, in which a summary of the progress achieved in the experimental program is provided. We have, however, included some aspects of the modeling activities. Volume 2 of the Final report describes the progress achieved in the modeling program. The progress achieved in the experimental and modeling parts of the Project has led to the resolution of some of the issues of melt vessel interaction. Considerable progress was also achieved towards resolution of the remaining issues

  1. COE-INES report on research and education activities. Final report

    International Nuclear Information System (INIS)

    2008-03-01

    Research and education activities on innovative nuclear energy systems to solve safety, radioactive waste and proliferation problems simultaneously, were summarized as a final report of COE-INES program. CANDLE (Constant Axial shape of Neutron flux, nuclide densities and power shape During Life of Energy producing reactor), lead-bismuth cooled fast reactors, small long-life reactors and water-cooled thorium breeding reactors were studies as innovative nuclear reactors. Experimental study of hydrogen system with carbon dioxide zero emission was progressed. Basic research on micro/nano-scale separation/transmutation of actinide nuclides and long-life fission products was conducted. Research on nuclear energy and social involvement was also conducted. (J.P.N.)

  2. Application of aerospace failure-reporting systems to power plants. Final report

    International Nuclear Information System (INIS)

    Koukol, J.F.; Lapin, E.E.; Leverton, W.F.; Pickering, W.H.

    1980-06-01

    Failure reporting and analysis is a principal element of the overall quality assurance scheme that helped achieve, and now sustains, a high level of reliability in our national aerospace effort. The aerospace endeavor has many points of congruence with other highly technological activities. These are marked by great economic investment, an extended interval between concept and final implementation, the involvement of many independent entities with the government exercising a dominating influence, a considerable exposure to public view and review by public bodies, a notoriety accompanying untoward events, and extreme consequences attending failure. This report is written in the expectation that the lessons learned in arriving at the present state in aerospace can be adopted by others. It is the object of the report to illuminate the essential features of the aerospace failure reporting system. Two schemes are described. One typifies that which is currently employed by the Jet Propulsion Laboratory (JPL) operated by the California Institute of Technology for the NASA/JPL Voyager project and is based on procedures developed over several decades of deep space exploration. The other is typical of that employed by the Space Divison of the Air Force for military space programs

  3. Evaluation of the contribution of radiological imaging to the final diagnosis in medical case reports

    International Nuclear Information System (INIS)

    Wiesinger, Isabel; Scharf, Gregor; Platz, Natascha; Dendl, Lena M.; Stroszczynski, Christian; Schreyer, Andreas G.; Pawlik, Michael T.

    2015-01-01

    To evaluate the clinical value and impact of radiological imaging in published medial case reports. We analysed 671 consecutively published case reports of a peer-reviewed medical journal for case reports. The general use of radiological imaging as well as the specific imaging modality used in each case (ultrasound, x-ray, fluoroscopy, CT, MRI) was documented, and most importantly the 'final problem solver', i.e. the diagnostic modality giving the final clue to the patient's diagnosis, was identified. In 511 of 671 (76.1 %) analysed case reports at least one radiological modality was used in the diagnostic cascade. In 28.6 % of all cases the final diagnosis was achieved by radiological imaging. All other cases were solved by the patient's history and physical examination (15.2 %), histology (12.4 %), and blood analysis (9.6 %). When radiology was the 'final problem solver', it was mainly CT (51.6 %) and MRI (30.6 %). In 52.2 % of the case reports the radiological image was included in the article. In case reports published in a prominent general medical journal radiological imaging is an important key player in the diagnostic process. In many cases, it is also the diagnostic tool which ultimately leads to determining the final diagnosis. (orig.)

  4. Evaluation of the contribution of radiological imaging to the final diagnosis in medical case reports

    Energy Technology Data Exchange (ETDEWEB)

    Wiesinger, Isabel; Scharf, Gregor; Platz, Natascha; Dendl, Lena M.; Stroszczynski, Christian; Schreyer, Andreas G. [University Hospital Regensburg, Institute of Radiology, Regensburg (Germany); Pawlik, Michael T. [Intensive Care and Emergency Medicine, Institute of Anaesthesiology, Regensburg (Germany)

    2015-05-01

    To evaluate the clinical value and impact of radiological imaging in published medial case reports. We analysed 671 consecutively published case reports of a peer-reviewed medical journal for case reports. The general use of radiological imaging as well as the specific imaging modality used in each case (ultrasound, x-ray, fluoroscopy, CT, MRI) was documented, and most importantly the 'final problem solver', i.e. the diagnostic modality giving the final clue to the patient's diagnosis, was identified. In 511 of 671 (76.1 %) analysed case reports at least one radiological modality was used in the diagnostic cascade. In 28.6 % of all cases the final diagnosis was achieved by radiological imaging. All other cases were solved by the patient's history and physical examination (15.2 %), histology (12.4 %), and blood analysis (9.6 %). When radiology was the 'final problem solver', it was mainly CT (51.6 %) and MRI (30.6 %). In 52.2 % of the case reports the radiological image was included in the article. In case reports published in a prominent general medical journal radiological imaging is an important key player in the diagnostic process. In many cases, it is also the diagnostic tool which ultimately leads to determining the final diagnosis. (orig.)

  5. Contracting of energy services in Switzerland. Development, effects, market potentials

    International Nuclear Information System (INIS)

    Muggli, C.; Baumgartner, W.; Kohn, L.

    1999-06-01

    The authors of this detailed report first define the contracting of energy services, this new reality of the market place, and analyse its current status in Switzerland. Contracting is mainly to be understood as the delegation of certain energy-related services by a company. The total investment for the operated energy systems considered by the study is about 120 millions USD, with an installed power of 160 MW. This market is highly unhomogeneous and is the answer to various goals. Globally, it brings a more efficient use of energy, including a more frequent involvement of renewable energy sources, along with a lower risk and significant advantages for all contractors. That is the reason for the energy policy authority to recommend contracting. The report goes on with the analysis of the factors leading the chief executives to consider contracting of energy services, or on the contrary to exclude it. The authors estimate the realistic potential market for contracting in Switzerland to 650 millions USD for the period 1999-2004. They conclude by giving recommendations which should result in an acceleration of the contracting's development on the market place

  6. Technical progress report

    International Nuclear Information System (INIS)

    1996-01-01

    This report summarizes experimental and theoretical work in basic nuclear physics carried out between October 1, 1995, the closing of our last Progress Report, and September 30, 1996 at the Nuclear Physics Laboratory of the University of Colorado, Boulder, under contracts DE-FG03-93ER-40774 and DE-FG03-95ER-40913 with the United States Department of Energy. The experimental contract supports broadly-based experimental research in intermediate energy nuclear physics. This report includes results from studies of Elementary Systems involving the study of the structure of the nucleon via polarized high-energy positron scattering (the HERMES experiment) and lower energy pion scattering from both polarized and unpolarized nucleon targets. Results from pion- and kaon-induced reactions in a variety of nuclear systems are reported under the section heading Meson Reactions; the impact of these and other results on understanding the nucleus is presented in the Nuclear Structure section. In addition, new results from scattering of high-energy electrons (from CEBAF/TJNAF) and pions (from KEK) from a broad range of nuclei are reported in the section on Incoherent Reactions. Finally, the development and performance of detectors produced by the laboratory are described in the section titled Instrumentation

  7. Possible contraction of the members of the binary pulsar PSR 1913+16 and its astrophysical consequences

    International Nuclear Information System (INIS)

    Spyrou, N.

    1983-01-01

    It is proposed that the small difference between the observed and the theoretically predicted decrease of the orbital period of the Binary Pulsar PSR 1913+16 is not due to the insufficiency of the quadrupole formula and can be attributed to a mass-energy loss due to the contraction of the binary's members. Assuming that the pair's primary is a typical, noncontracting pulsar, is in favour of a slowly contracting, neutron-star companion, thus limiting the member's radii to at most 25 km and 28 km, respectively. The primary's computed total absolute luminosity is in excellent agreement with the observed upper limit of its X-ray and optical luminosities. Moreover, the companion's slow contraction rate implies that its present total absolute luminosity presents a maximum at wavelengths characteristic of X-rays. Finally, it suggests that if the energy-loss remains constant, the duration of the contraction phase will be of the order of 10 8 y and the final radius about 25 km. (Auth.)

  8. Defense Threat Reduction Agency > Contracts > Business Opportunities

    Science.gov (United States)

    History Documents US Underground Nuclear Test History Reports NTPR Radiation Exposure Reports Enewetak Atoll Cleanup Documents TRAC About Who We Are Our Values History Locations Our Leadership Director Support Center Contact Us FAQ Sheet Links Success Stories Contracts Business Opportunities Current

  9. Identifying psychological contract breaches to guide improvements in faculty recruitment, retention, and development.

    Science.gov (United States)

    Peirce, Gretchen L; Desselle, Shane P; Draugalis, JoLaine R; Spies, Alan R; Davis, Tamra S; Bolino, Mark

    2012-08-10

    To identify pharmacy faculty members' perceptions of psychological contract breaches that can be used to guide improvements in faculty recruitment, retention, and development. A list of psychological contract breaches was developed using a Delphi procedure involving a panel of experts assembled through purposive sampling. The Delphi consisted of 4 rounds, the first of which elicited examples of psychological contract breaches in an open-ended format. The ensuing 3 rounds consisting of a survey and anonymous feedback on aggregated group responses. Usable responses were obtained from 11 of 12 faculty members who completed the Delphi procedure. The final list of psychological contract breaches included 27 items, after modifications based on participant feedback in subsequent rounds. The psychological contract breach items generated in this study provide guidance for colleges and schools of pharmacy regarding important aspects of faculty recruitment, retention, and development.

  10. [Boundaries and integrity in the "Social Contract for Spanish Science", 1907-1939].

    Science.gov (United States)

    Gómez, Amparo

    2014-01-01

    This article analyzes the relationship between science and politics in Spain in the early 20th century from the perspective of the Social Contract for Science. The article shows that a genuine social contract for science was instituted in Spain during this period, although some boundary and integrity problems emerged. These problems are analyzed, showing that the boundary problems were a product of the conservative viewpoint on the relationship between science and politics, while the integrity problems involved the activation of networks of influence in the awarding of scholarships to study abroad. Finally, the analysis reveals that these problems did not invalidate the Spanish social contract for science.

  11. Space Processing Applications rocket project SPAR III. Final report

    International Nuclear Information System (INIS)

    Reeves, F.

    1978-01-01

    This document presents the engineering report and science payload III test report and summarizes the experiment objectives, design/operational concepts, and final results of each of five scientific experiments conducted during the third Space Processing Applications Rocket (SPAR) flight flown by NASA in December 1976. The five individual SPAR experiments, covering a wide and varied range of scientific materials processing objectives, were entitled: Liquid Mixing, Interaction of Bubbles with Solidification Interfaces, Epitaxial Growth of Single Crystal Film, Containerless Processing of Beryllium, and Contact and Coalescence of Viscous Bodies

  12. North Central regional environmental characterization report: executive summary - final

    International Nuclear Information System (INIS)

    1985-08-01

    This Executive Summary of the final North Central Regional Environmental Characterization Report (RECR) is issued primarily for public information purposes and provides a general overview of the report. The complete RECR presents available regional environmental information pertinent to siting a repository for high-level nuclear waste in crystalline rock in Minnesota, Wisconsin, and the Upper Peninsula of Michigan. For each of the States within the North Central Region, information is provided on the environmental disqualifying factors and the environmental regional screening variables to be used in region-to-area screening

  13. Final report: Compiled MPI. Cost-Effective Exascale Application Development

    Energy Technology Data Exchange (ETDEWEB)

    Gropp, William Douglas [Univ. of Illinois, Urbana-Champaign, IL (United States)

    2015-12-21

    This is the final report on Compiled MPI: Cost-Effective Exascale Application Development, and summarizes the results under this project. The project investigated runtime enviroments that improve the performance of MPI (Message-Passing Interface) programs; work at Illinois in the last period of this project looked at optimizing data access optimizations expressed with MPI datatypes.

  14. No. 2 heating oil/propane program 1994--1995. Final report

    International Nuclear Information System (INIS)

    McBrien, J.

    1995-05-01

    During the 1994--95 heating season, the Massachusetts Division of Energy Resources (DOER) participated in a joint data collection program between several state energy offices and the federal Department of Energy's (DOE) Energy Information Administration (EIA). The purpose of the program was to collect and monitor retail and wholesale heating oil and propane prices and inventories from October 1994 through March 1995. This program augmented the existing Massachusetts data collection system and served several important functions. The information helped the federal and state governments respond to consumer, congressional and media inquiries regarding No. 2 oil and propane. The information also provided policy decision-makers with timely, accurate and consistent data to monitor current heating oil and propane markets and develop appropriate state responses when necessary. In addition, the communication network between states and the DOE was strengthened through this program. This final report begins with an overview of the unique events that had an impact on the petroleum markets prior to and during the reporting period. Next, the report summarizes the results from residential heating oil and propane price surveys conducted by DOER over the 1994--95 heating season. The report also incorporates the wholesale heating oil and propane prices and inventories collected by EIA and distributed to the states. Finally, the report outlines DOER's use of the data

  15. Brayton isotope power system, phase I. Final report

    International Nuclear Information System (INIS)

    1978-01-01

    The Phase I program resulted in the development and ground demonstration of a dynamic power conversion system. The two key contractual objectives of 25% conversion efficiency and 1000 h of endurance testing were successfully met. As a result of the Phase I effort, the BIPS is a viable candidate for further development into a flight system capable of sustained operation in space. It represents the only known dynamic space power system to demonstrate the performance and endurance coupled with the simplicity necessary for reliable operation. This final report follows thirty-five monthly reports. For expediency, it makes liberal use of referenced documents which have been submitted to DOE during the course of the program

  16. Listening to the River: Final Evaluation Report

    Science.gov (United States)

    Robles, Dawn; Mitchell, Heather; Horsch, Elizabeth; St. John, Mark

    2010-01-01

    "Listening to the River" (LTTR) is a watershed science education project funded by the National Science Foundation. The project aims to deliver watershed education experiences in and around Traverse City, Michigan, and also to develop a model that can be replicated in other locations. Inverness Research was contracted by the…

  17. Sustainable refurbishment of exterior walls and building facades. Final report, Part B - General refurbishment concepts

    Energy Technology Data Exchange (ETDEWEB)

    Vares, S.; Pulakka, S.; Toratti, T. [and others

    2012-11-01

    This report is the second part of the final report of Sustainable refurbishment of building facades and exterior walls (SUSREF). SUSREF project was a collaborative (small/medium size) research project within the 7th Framework Programme of the Commission and it was financed under the theme Environment (including climate change) (Grant agreement no. 226858). The project started in October 1st 2009 and ended in April 30th 2012. The project included 11 partners from five countries. SUSREF developed sustainable concepts and technologies for the refurbishment of building facades and external walls. This report together with SUSREF Final report Part B and SUSREF Final Report Part C introduce the main results of the project. Part A focuses on methodological issues. The descriptions of the concepts and the assessment results of the developed concepts are presented in SUSREF Final report part B (generic concepts) and SUSREF Final report Part C (SME concepts). The following list shows the sustainability assessment criteria defined by the SUSREF project. These are Durability; Impact on energy demand for heating; Impact on energy demand for cooling; Impact on renewable energy use potential; Impact on daylight; Environmental impact of manufacture and maintenance; Indoor air quality and acoustics; Structural stability; Fire safety; Aesthetic quality; Effect on cultural heritage; Life cycle costs; Need for care and maintenance; Disturbance to the tenants and to the site; Buildability. This report presents sustainability assessment results of general refurbishment concepts and gives recommendations on the basis of the results. The report covers the following refurbishment cases - External insulation - Internal insulation - Cavity wall insulation - Replacement Insulation during renovation.

  18. Instrument to measure psychological contract violation in pharmacy students.

    Science.gov (United States)

    Spies, Alan R; Wilkin, Noel E; Bentley, John P; Bouldin, Alicia S; Wilson, Marvin C; Holmes, Erin R

    2010-08-10

    To adapt and evaluate an instrument that measures perceived psychological contract violations in pharmacy students by schools and colleges of pharmacy. A psychological contract violations measure was developed from existing literature and the 1997 ACPE Guidelines and pilot-tested with second-year pharmacy students at 2 schools of pharmacy. A revised measure then was administered to second-year pharmacy students at 6 schools of pharmacy. Using a 5-point Likert-type scale, participants were asked to indicate the level of obligations they received compared to what was promised by the school of pharmacy. Exploratory factor analysis on the psychological contract violations measure was conducted using principal components analysis resulting in 7 factors, which led to a revised measure with 26 items. Using a sample of 339 students, the proposed 7-factor measurement model was tested using confirmatory factor analysis. In general, the results supported the hypothesized model. The final 23-item scale demonstrated both reliability and validity. Some students perceived certain aspects of the psychological contract that exists with their school of pharmacy were being violated. The psychological contract violations measure may serve as a valuable tool in helping to identify areas where their students believe that schools/colleges of pharmacy have not fulfilled promised obligations.

  19. Polymorphic Contracts

    Science.gov (United States)

    Belo, João Filipe; Greenberg, Michael; Igarashi, Atsushi; Pierce, Benjamin C.

    Manifest contracts track precise properties by refining types with predicates - e.g., {x : Int |x > 0 } denotes the positive integers. Contracts and polymorphism make a natural combination: programmers can give strong contracts to abstract types, precisely stating pre- and post-conditions while hiding implementation details - for example, an abstract type of stacks might specify that the pop operation has input type {x :α Stack |not ( empty x )} . We formalize this combination by defining FH, a polymorphic calculus with manifest contracts, and establishing fundamental properties including type soundness and relational parametricity. Our development relies on a significant technical improvement over earlier presentations of contracts: instead of introducing a denotational model to break a problematic circularity between typing, subtyping, and evaluation, we develop the metatheory of contracts in a completely syntactic fashion, omitting subtyping from the core system and recovering it post facto as a derived property.

  20. Final report. [Nonlinear magnetohydrodynamics

    International Nuclear Information System (INIS)

    Montgomery, D.C.

    1998-01-01

    This is a final report on the research activities carried out under the above grant at Dartmouth. During the period considered, the grant was identified as being for nonlinear magnetohydrodynamics, considered as the most tractable theoretical framework in which the plasma problems associated with magnetic confinement of fusion plasmas could be studied. During the first part of the grant's lifetime, the author was associated with Los Alamos National Laboratory as a consultant and the work was motivated by the reversed-field pinch. Later, when that program was killed at Los Alamos, the problems became ones that could be motivated by their relation to tokamaks. Throughout the work, the interest was always on questions that were as fundamental as possible, compatible with those motivations. The intent was always to contribute to plasma physics as a science, as well as to the understanding of mission-oriented confined fusion plasmas. Twelve Ph.D. theses were supervised during this period and a comparable number of postdoctoral research associates were temporarily supported. Many of these have gone on to distinguished careers, though few have done so in the context of the controlled fusion program. Their work was a combination of theory and numerical computation, in gradually less and less idealized settings, moving from rectangular periodic boundary conditions in two dimensions, through periodic straight cylinders and eventually, before the grant was withdrawn, to toroids, with a gradually more prominent role for electrical and mechanical boundary conditions. The author never had access to a situation where he could initiate experiments and relate directly to the laboratory data he wanted. Computers were the laboratory. Most of the work was reported in referred publications in the open literature, copies of which were transmitted one by one to DOE at the time they appeared. The Appendix to this report is a bibliography of published work which was carried out under the

  1. Managing urban wastewater in China: a survey of build-operate-transfer contracts

    NARCIS (Netherlands)

    Braadbaart, O.D.; Zhang, M.S.; Wang, Y.

    2009-01-01

    This paper reports on a nationwide field survey of wastewater plants under build-operate-transfer ( BOT) contracts in China. The survey yielded information on contracting parties, size, duration and location of 37 BOT contracts. The key findings are that municipal governments feature as first

  2. Raise the management level of EPC contracting in six aspects

    International Nuclear Information System (INIS)

    Wang Baowei; Feng Shoujia

    2010-01-01

    Nuclear power construction develops rapidly today and EPC contracting for nuclear power projects, as a strategic decision of CNNC, has become a tendency. The target of engineering management can be smoothly realized or achieved by doing a good job in the following six aspects: effective communication between divisions of project department, high-degree consistency of managerial concepts for project management staff, clear objective for different divisions in the project department, presence of rules to be observed in construction management work, avoidance of human-initiated errors in the project, and clear distinction of management control concept. It is hoped that, through exchange and practice, management procedures and consciousness for EPC contracting can be further standardized and thus the level of management for EPC contracting will be raised finally. (authors)

  3. Raise the management level of EPC contracting in six aspects

    International Nuclear Information System (INIS)

    Wang Baowei; Feng Shoujia

    2010-01-01

    Nuclear power construction develops rapidly today and EPC contracting for nuclear power projects, as a strategic decision of CNNC, has become a tendency. The target of engineering management can be smoothly realized or achieved by doing a good job in the following six aspects:effective communication between divisions of project department, high-degree consistency of managerial concepts for project management staff, clear objective for different divisions in the project department, presence of rules to be observed in construction management work, avoidance of human-initiated errors in the project, and clear distinction of management control concept. It is hoped that, through exchange and practice, management procedures and consciousness for EPC contracting can be further standardized and thus the level of management for EPC contracting will be raised finally. (authors)

  4. Diaphragmatic lymphatic vessel behavior during local skeletal muscle contraction.

    Science.gov (United States)

    Moriondo, Andrea; Solari, Eleonora; Marcozzi, Cristiana; Negrini, Daniela

    2015-02-01

    The mechanism through which the stresses developed in the diaphragmatic tissue during skeletal muscle contraction sustain local lymphatic function was studied in 10 deeply anesthetized, tracheotomized adult Wistar rats whose diaphragm was exposed after thoracotomy. To evaluate the direct effect of skeletal muscle contraction on the hydraulic intraluminal lymphatic pressures (Plymph) and lymphatic vessel geometry, the maximal contraction of diaphragmatic fibers adjacent to a lymphatic vessel was elicited by injection of 9.2 nl of 1 M KCl solution among diaphragmatic fibers while Plymph was recorded through micropuncture and vessel geometry via stereomicroscopy video recording. In lymphatics oriented perpendicularly to the longitudinal axis of muscle fibers and located at skeletal muscle contraction (Dmc) decreased to 61.3 ± 1.4% of the precontraction value [resting diameter (Drest)]; however, if injection was at >900 μm from the vessel, Dmc enlarged to 131.1 ± 2.3% of Drest. In vessels parallel to muscle fibers, Dmc increased to 122.8 ± 2.9% of Drest. During contraction, Plymph decreased as much as 22.5 ± 2.6 cmH2O in all submesothelial superficial vessels, whereas it increased by 10.7 ± 5.1 cmH2O in deeper vessels running perpendicular to contracting muscle fibers. Hence, the three-dimensional arrangement of the diaphragmatic lymphatic network seems to be finalized to efficiently exploit the stresses exerted by muscle fibers during the contracting inspiratory phase to promote lymph formation in superficial submesothelial lymphatics and its further propulsion in deeper intramuscular vessels. Copyright © 2015 the American Physiological Society.

  5. Modern Grid Initiative Distribution Taxonomy Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, Kevin P.; Chen, Yousu; Chassin, David P.; Pratt, Robert G.; Engel, David W.; Thompson, Sandra E.

    2008-11-01

    This is the final report for the development of a toxonomy of prototypical electrical distribution feeders. Two of the primary goals of the Department of Energy's (DOE) Modern Grid Initiative (MGI) are 'to accelerate the modernization of our nation's electricity grid' and to 'support demonstrations of systems of key technologies that can serve as the foundation for an integrated, modern power grid'. A key component to the realization of these goals is the effective implementation of new, as well as existing, 'smart grid technologies'. Possibly the largest barrier that has been identified in the deployment of smart grid technologies is the inability to evaluate how their deployment will affect the electricity infrastructure, both locally and on a regional scale. The inability to evaluate the impacts of these technologies is primarily due to the lack of detailed electrical distribution feeder information. While detailed distribution feeder information does reside with the various distribution utilities, there is no central repository of information that can be openly accessed. The role of Pacific Northwest National Laboratory (PNNL) in the MGI for FY08 was to collect distribution feeder models, in the SynerGEE{reg_sign} format, from electric utilities around the nation so that they could be analyzed to identify regional differences in feeder design and operation. Based on this analysis PNNL developed a taxonomy of 24 prototypical feeder models in the GridLAB-D simulations environment that contain the fundamental characteristics of non-urban core, radial distribution feeders from the various regions of the U.S. Weighting factors for these feeders are also presented so that they can be used to generate a representative sample for various regions within the United States. The final product presented in this report is a toolset that enables the evaluation of new smart grid technologies, with the ability to aggregate their effects

  6. 29 CFR 4.122 - Contracts for operation of postal contract stations.

    Science.gov (United States)

    2010-07-01

    ... Application of the McNamara-O'Hara Service Contract Act Specific Exclusions § 4.122 Contracts for operation of postal contract stations. The Act, in paragraph (7) of section 7, exempts from its provisions “any... 29 Labor 1 2010-07-01 2010-07-01 true Contracts for operation of postal contract stations. 4.122...

  7. Technical assistance for Meharry Medical College Energy Efficiency Project. Final project status and technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-08

    This report presents the results of a program to provide technical assistance to Meharry Medical College. The purpose of the program is to facilitate Meharry`s effort to finance a campus-wide facility retrofit. The US Department of Energy (USDOE) funded the program through a grant to the Tennessee Department of Economic and Community Development (TECD). The University of Memphis-Technology and Energy Services (UM-TES), under contract to TECD, performed program services. The report has three sections: (1) introduction; (2) project definition, financing, and participants; and (3) opportunities for federal participation.

  8. Contractual Efficiency of PPP Infrastructure Projects: An Incomplete Contract Model

    Directory of Open Access Journals (Sweden)

    Lei Shi

    2018-01-01

    Full Text Available This study analyses the contractual efficiency of public-private partnership (PPP infrastructure projects, with a focus on two financial aspects: the nonrecourse principal and incompleteness of debt contracts. The nonrecourse principal releases the sponsoring companies from the debt contract when the special purpose vehicle (SPV established by the sponsoring companies falls into default. Consequently, all obligations under the debt contract are limited to the liability of the SPV following its default. Because the debt contract is incomplete, a renegotiation of an additional loan between the bank and the SPV might occur to enable project continuation or liquidation, which in turn influences the SPV’s ex ante strategies (moral hazard. Considering these two financial features of PPP infrastructure projects, this study develops an incomplete contract model to investigate how the renegotiation triggers ex ante moral hazard and ex post inefficient liquidation. We derive equilibrium strategies under service fees endogenously determined via bidding and examine the effect of equilibrium strategies on contractual efficiency. Finally, we propose an optimal combination of a performance guarantee, the government’s termination right, and a service fee to improve the contractual efficiency of PPP infrastructure projects.

  9. Defense Threat Reduction Agency > Contracts > Business Opportunities >

    Science.gov (United States)

    Atmospheric Nuclear Test History Documents US Underground Nuclear Test History Reports NTPR Radiation Exposure Reports Enewetak Atoll Cleanup Documents TRAC About Who We Are Our Values History Locations Our Leadership Support Center Contact Us FAQ Sheet Links Success Stories Contracts Business Opportunities Current

  10. IPP fuel contracts - creating certain contracts for uncertain times

    Energy Technology Data Exchange (ETDEWEB)

    Coddington, I. [Coddington International Pty. Ltd., Milsons Point, NSW (Australia)

    1998-12-31

    Coal contracts for the new Asian Independent Power Producers (IPPs) are examined. Since most IPPs will be selling to state electricity utilities, often in competition with power plant using other fuels, coal based IPPs must negotiate advantageous coal supply contracts several years before the commissioning of a plant, and must ensure security of supply for at least the life of the construction loan. A more recent trend in the developed world is the Merchant IPP, where there is no guaranteed electricity sale. Lenders are wary of IPPs relying an imported coal, and insist on binding fuel contracts, while coal companies are wary of the quantity of information demanded by these lenders. A full understanding of the risks involved is needed; and a method of price indexation for the contracts. Contracts must also specify security of supply, coal quality, freight contracts and other details. 2 figs.

  11. ADMINISTRATIVE CONTRACTS. DELIMITATIONS

    Directory of Open Access Journals (Sweden)

    Liana Teodora PASCARIU

    2016-12-01

    Full Text Available Article examines whether all contracts of public persons are administrative contracts; in other words, if the administration may conclude contracts that, according to their legal nature, are not administrative. If we start from the definition of administrative contracts as it appears in Law no. 554/2004, these include contracts by public authorities which concern the enhancement of public property execution of works of public interest, public services, public procurement and other administrative contracts provided by special laws and subject to the jurisdiction of the administrative courts.

  12. Columbia River system operation review: Final environmental impact statement. Main report

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) Final EIS addresses four actions: (a) need to develop coordinated strategy for managing the multiple uses of the Federal Columbia River system (System Operating Strategy [SOS]); (b) need to provide interested parties other than management agencies with a long-term role in system planning (Forum); (c) need to renew or change current Canadian Entitlement Allocation Agreements (CEAA); and (d) need to renegotiate and renew the Pacific Northwest Coordination Agreement (PNCA). SOS alternatives analyzed are: (1) operation prior to Endangered Species Act listings of salmon stocks; (2) current operations (no action); (3) stable storage project operation; (4) natural river operation; (5) fixed drawdown; (6) operating strategies proposed by the U.S. Fish and Wildlife Service, National Marine Fisheries Service, State fisheries agencies, Native American tribes, and Federal operating agencies; and (7) Preferred Alternative. The seven Forum alternatives analyzed are: (1) decisionmaking by the SOR lead agencies (preferred alternative); (2) decisionmaking by SOR lead agencies and recommendations by an existing regional entity; (3) decisionmaking by SOR lead agencies and recommendations by a new regional entity; (4) decisionmaking by a Federal consultation forum; (5) decisionmaking by a new entity; (6) decisionmaking by one Federal operating agency; (7) decisionmaking by a Federal agency other than an operating agency. PNCA alternatives analyzed are: (1) no replacement contract; (2) contract to maximize regional power benefits; (3) roll over existing PNCA; (4) current PNCA with modified operating procedures (preferred alternative); (5) current PNCA with nonpower modifications. CEAA alternatives include: (1) no action (no replacement of current allocation agreements); (2) entitlement allocation: 55 percent Federal; 45 percent non-Federal; (3) entitlement allocation: 70 percent Federal, 30 percent non-Federal (preferred alternative); (4) no agreement

  13. Columbia River System Operation Review : Final Environmental Impact Statement, Main Report.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.); United States. Bonneville Power Administration; United States. Army. Corps of Engineers. North Pacific Division; United States. Bureau of Reclamation. Pacific Northwest Region.

    1995-11-01

    The System Operation Review (SOR) Final EIS addresses four actions: (a) need to develop coordinated strategy for managing the multiple uses of the Federal Columbia River system (System Operating Strategy [SOS]); (b) need to provide interested parties other than management agencies with a long-term role in system planning (Forum); (c) need to renew or change current Canadian Entitlement Allocation Agreements (CEAA); and (d) need to renegotiate and renew the Pacific Northwest Coordination Agreement (PNCA). SOS alternatives analyzed are: (1) operation prior to Endangered Species Act listings of salmon stocks; (2) current operations (no action); (3) stable storage project operation; (4) natural river operation; (5) fixed drawdown; (6) operating strategies proposed by the U.S. Fish and Wildlife Service, National Marine Fisheries Service, State fisheries agencies, Native American tribes, and Federal operating agencies; and (7) Preferred Alternative. The seven Forum alternatives analyzed are: (1) decisionmaking by the SOR lead agencies (preferred alternative); (2) decisionmaking by SOR lead agencies and recommendations by an existing regional entity; (3) decisionmaking by SOR lead agencies and recommendations by a new regional entity; (4) decisionmaking by a Federal consultation forum; (5) decisionmaking by a new entity; (6) decisionmaking by one Federal operating agency; (7) decisionmaking by a Federal agency other than an operating agency. PNCA alternatives analyzed are: (1) no replacement contract; (2) contract to maximize regional power benefits; (3) roll over existing PNCA; (4) current PNCA with modified operating procedures (preferred alternative); (5) current PNCA with nonpower modifications. CEAA alternatives include: (1) no action (no replacement of current allocation agreements); (2) entitlement allocation: 55 percent Federal; 45 percent non-Federal; (3) entitlement allocation: 70 percent Federal, 30 percent non-Federal (preferred alternative); (4) no agreement.

  14. Electrical contracting

    CERN Document Server

    Neidle, Michael

    2013-01-01

    Electrical Contracting, Second Edition is a nine-chapter text guide for the greater efficiency in planning and completing installations for the design, installation and control of electrical contracts. This book starts with a general overview of the efficient cabling and techniques that must be employed for safe wiring design, as well as the cost estimation of the complete electrical contract. The subsequent chapters are devoted to other electrical contracting requirements, including electronic motor control, lighting, and electricity tariffs. A chapter focuses on the IEE Wiring Regulations an

  15. Program and Abstracts, Boron Americas IX Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Feakes, Debra A.

    2006-08-09

    The Scientific and Technical Information (STI) submitted includes the final report and a collection of abstracts for the Ninth Boron in the Americas Conference which was held May 19-22, 2004, in San Marcos, Texas. The topics covered in the abstracts include: Application in Medicine, Application in Organic Synthesis and Catalysis, Boranes and Carboranes, Materials and Polymers, Metallaboranes and Metallacarboranes, Organoboron Compounds, Synthesis and Catalysis, and Theoretical Studies. Attendees represented researchers from government, industry, and academia.

  16. Low enrichment fuel conversion for Iowa State University. Final report

    International Nuclear Information System (INIS)

    Bullen, D.B.; Wendt, S.E.

    1996-01-01

    The UTR-10 research and teaching reactor at Iowa State University (ISU) has been converted from high-enriched fuel (HEU) to low- enriched fuel (LEU) under Grant No. DE-FG702-87ER75360 from the Department of Energy (DOE). The original contract period was August 1, 1987 to July 31, 1989. The contract was extended to February 28, 1991 without additional funding. Because of delays in receiving the LEU fuel and the requirement for disassembly of the HEU assemblies, the contract was renewed first through May 31, 1992, then through May 31, 1993 with additional funding, and then again through July 31, 1994 with no additional funding. In mid-August the BMI cask was delivered to Iowa State. Preparations are underway to ship the HEU fuel when NRC license amendments for the cask are approved

  17. The Finnish research programme on climate change. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Roos, J [ed.

    1997-12-31

    This is the final report of the Finnish Research Programme on Climate Change (SILMU). This report includes the final results and conclusions made by the individual research groups. The aim of this report is to lay out the research work, and to present the main results and conclusions obtained during the six-year work. The Finnish Research Programme on Climate Change (SILMU) was a multidisciplinary national research programme on climate and global change. The principal goals of SILMU were: (1) to increase our knowledge on climate change, its causes, mechanisms and consequences, (2) to strengthen the research on climate change in Finland, (3) to increase the participation of Finnish researchers in international research programmes, and (4) to prepare and disseminate information for policy makers on adaptation and mitigation. The key areas of the research were: (1) quantification of the greenhouse effect and the magnitude of anticipated climatic changes,(2) assessment of the effects of changing climate on ecosystems, and (3) development of mitigation and adaptation strategies. The research programme started in June 1990, and it comprised more than 80 individual research projects, ranging from atmospheric chemistry to economics. There were approximately two hundred scientists working within the programme in seven universities and eleven research institutions. The research activities that comprise SILMU were grouped into four interdisciplinary subprogrammes: atmosphere, waters, terrestrial ecosystems and integration and human interactions

  18. The Finnish research programme on climate change. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Roos, J. [ed.

    1996-12-31

    This is the final report of the Finnish Research Programme on Climate Change (SILMU). This report includes the final results and conclusions made by the individual research groups. The aim of this report is to lay out the research work, and to present the main results and conclusions obtained during the six-year work. The Finnish Research Programme on Climate Change (SILMU) was a multidisciplinary national research programme on climate and global change. The principal goals of SILMU were: (1) to increase our knowledge on climate change, its causes, mechanisms and consequences, (2) to strengthen the research on climate change in Finland, (3) to increase the participation of Finnish researchers in international research programmes, and (4) to prepare and disseminate information for policy makers on adaptation and mitigation. The key areas of the research were: (1) quantification of the greenhouse effect and the magnitude of anticipated climatic changes,(2) assessment of the effects of changing climate on ecosystems, and (3) development of mitigation and adaptation strategies. The research programme started in June 1990, and it comprised more than 80 individual research projects, ranging from atmospheric chemistry to economics. There were approximately two hundred scientists working within the programme in seven universities and eleven research institutions. The research activities that comprise SILMU were grouped into four interdisciplinary subprogrammes: atmosphere, waters, terrestrial ecosystems and integration and human interactions

  19. FINAL REPORT: Transformational electrode drying process

    Energy Technology Data Exchange (ETDEWEB)

    Claus Daniel, C.; Wixom, M.(A123 Systems, Inc.)

    2013-12-19

    This report includes major findings and outlook from the transformational electrode drying project performance period from January 6, 2012 to August 1, 2012. Electrode drying before cell assembly is an operational bottleneck in battery manufacturing due to long drying times and batch processing. Water taken up during shipment and other manufacturing steps needs to be removed before final battery assembly. Conventional vacuum ovens are limited in drying speed due to a temperature threshold needed to avoid damaging polymer components in the composite electrode. Roll to roll operation and alternative treatments can increase the water desorption and removal rate without overheating and damaging other components in the composite electrode, thus considerably reducing drying time and energy use. The objective of this project was the development of an electrode drying procedure, and the demonstration of processes with no decrease in battery performance. The benchmark for all drying data was an 80°C vacuum furnace treatment with a residence time of 18 – 22 hours. This report demonstrates an alternative roll to roll drying process with a 500-fold improvement in drying time down to 2 minutes and consumption of only 30% of the energy compared to vacuum furnace treatment.

  20. C-Band Airport Surface Communications System Standards Development. Phase II Final Report. Volume 2: Test Bed Performance Evaluation and Final AeroMACS Recommendations

    Science.gov (United States)

    Hall, Edward; Magner, James

    2011-01-01

    This report is provided as part of ITT s NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: New ATM Requirements-Future Communications, C-Band and L-Band Communications Standard Development and was based on direction provided by FAA project-level agreements for New ATM Requirements-Future Communications. Task 7 included two subtasks. Subtask 7-1 addressed C-band (5091- to 5150-MHz) airport surface data communications standards development, systems engineering, test bed and prototype development, and tests and demonstrations to establish operational capability for the Aeronautical Mobile Airport Communications System (AeroMACS). Subtask 7-2 focused on systems engineering and development support of the L-band digital aeronautical communications system (L-DACS). Subtask 7-1 consisted of two phases. Phase I included development of AeroMACS concepts of use, requirements, architecture, and initial high-level safety risk assessment. Phase II builds on Phase I results and is presented in two volumes. Volume I is devoted to concepts of use, system requirements, and architecture, including AeroMACS design considerations. Volume II (this document) describes an AeroMACS prototype evaluation and presents final AeroMACS recommendations. This report also describes airport categorization and channelization methodologies. The purposes of the airport categorization task were (1) to facilitate initial AeroMACS architecture designs and enable budgetary projections by creating a set of airport categories based on common airport characteristics and design objectives, and (2) to offer high-level guidance to potential AeroMACS technology and policy development sponsors and service providers. A channelization plan methodology was developed because a common global methodology is needed to assure seamless interoperability among diverse AeroMACS services potentially supplied by multiple service providers.

  1. Supply Chain Contracts with Multiple Retailers in a Fuzzy Demand Environment

    Directory of Open Access Journals (Sweden)

    Shengju Sang

    2013-01-01

    Full Text Available This study investigates supply chain contracts with a supplier and multiple competing retailers in a fuzzy demand environment. The market demand is considered as a positive triangular fuzzy number. The models of centralized decision, return contract, and revenue-sharing contract are built by the method of fuzzy cut sets theory, and their optimal policies are also proposed. Finally, an example is given to illustrate and validate the models and conclusions. It is shown that the optimal total order quantity of the retailers fluctuates at the center of the fuzzy demand. With the rise of the number of retailers, the optimal order quantity and the fuzzy expected profit for each retailer will decrease, and the fuzzy expected profit for supplier will increase.

  2. Analysis of the 314th Contracting Squadrons Contract Management Capability Using the Contract Management Maturity Model (CMMM)

    National Research Council Canada - National Science Library

    Jackson, Jr, Carl J

    2007-01-01

    .... The purpose of this research project is to analyze the 314th Contracting Squadron contracting processes and requirement target areas for improvement efforts by the application of the Contract Management Maturity Model (CMMM...

  3. Report on Allegation of Unsatisfactory Conditions Regarding Actions by the Defense Contract Management Agency, Earned Value Management Center

    Science.gov (United States)

    2010-07-28

    object ivity of Defen se Contract Management Agency to carry ou t its ea rn ed va lue managemen t oversight responsibilities; and DCMA Response: Non...Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302...Earned Value Management Center Director advised us that the 2-week time frame was “standard operating procedure” for performing compliance reviews at

  4. Cooperative research in coal liquefaction. Final report, May 1, 1990-- April 30, 1991

    Energy Technology Data Exchange (ETDEWEB)

    Huffman, G.P. [ed.

    1992-02-15

    The Consortium for Fossil Fuel Liquefaction Science (CFFLS) is currently engaged in a three year contract with the US Department of Energy investigating a range of research topics dealing with direct coal liquefaction. This report summarizes the results of this program in its second year, from May 1, 1990 to April 30, 1991. Accomplishments for this period are presented for the following tasks: Iron-based catalysts for coal liquefaction, exploratory research on coal conversion, novel coal liquefaction concepts, and novel catalysts for coal liquefaction.

  5. 75 FR 18034 - Defense Federal Acquisition Regulation Supplement; Research and Development Contract Type...

    Science.gov (United States)

    2010-04-08

    ... Budget under 44 U.S.C. 3501, et seq. List of Subjects in 48 CFR Parts 234 and 235 Government procurement...). ACTION: Final rule. SUMMARY: DoD is adopting as final, without change, an interim rule that requires the Milestone Decision Authority (MDA) for a major defense acquisition program (MDAP) to select the contract...

  6. Construction contracting for the 1990s

    International Nuclear Information System (INIS)

    Kane, C.; Lyon, V.F.

    1991-01-01

    This paper reports that power plant constructing during the 1980s is over. Demand growth projections presently anticipate a need for 100,000 MW of new capacity by the year 2000, with only a small percentage of the demand growth currently under construction. Given a six-year lead time for baseload plants, a surge of activity must now begin. Another development over the past five years has been a conscious decision by regulators in increase rates only for the costs of efficiently built plants. The cost of construction inefficiencies will no longer be shouldered by investors. Large construction claims, excessive cost overruns, and expensive delays will no longer be passed on to the consumer automatically. Utility commissions will require the inefficient builders to either clean up their act or forego building their own plants. The most traditional contracting scheme, general contracting, will probably be the lease desirable in the construction of new power plants. General contracting is a single, general construction contract based on a detailed design. The design is not performed by the general contractor

  7. 2006 Toronto smog report card : final grade C-

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    This annual report card evaluated the progress made by the City of Toronto toward reducing the environmental and health impacts of smog. The final grade for 2006 was a C-, the same as for 2005. The highest grade of B+ was issued in 2004. The report card evaluated City Council actions based on their clean air commitments. Although the summer of 2006 was one of the best on record, with only 11 smog days, the grade of C- was issued because the performance of the City's Air Quality Improvement record was poor. Toronto Environmental Alliance strongly recommended that important changes be made to improve air quality, transit and waste disposal. It recommended that the City should address the real causes of unclean air, which are motor vehicle exhaust and toxic pollution. This report card graded the performance on initiatives in the following six major areas: energy; transit; air quality plan; walking and biking; fleets and fuels; and, intergovernmental action. The report recommended that efforts should be made to reduce greenhouse gas emissions which cause global warming. refs., tabs., figs.

  8. FINAL Progress Report DOE Grant DE-FG02-04ER15587

    Energy Technology Data Exchange (ETDEWEB)

    Mullins, Charles Buddie [Univ. of Texas, Austin, TX (United States)

    2016-11-03

    Catalysis Program - Viviane Schwartz Program Manager This Final Report discusses several archival journal articles that have been published that present and discuss the results that were discovered through this DOE grant.

  9. Contracting with the Enemy: The Contracting Officer’s Dilemma

    Science.gov (United States)

    2015-06-01

    contracting command xv KO contracting officer KTR contractor LSC lead service component MGAA Mesopotamia Group Atlas Apache NAT National Afghanistan...and Contract Authority Understanding the roles of contracting versus command authority and command relationships is a fundamental that must be...Audit 12-7 (2012) described the CENTCOM-JTSCC (C- JTSCC) formation and command relationship : In April 2010, CENTCOM issued a fragmentary order to

  10. Final Report on ITER Task Agreement 81-18

    Energy Technology Data Exchange (ETDEWEB)

    Brad J. Merrill

    2008-02-01

    During 2007, the US International Thermonuclear Experimental Reactor (ITER) Project Office (USIPO) entered into a Task Agreement (TA) with the ITER International Organization (IO) to conduct Research and Development activity and/or Design activity in the area of Safety Analyses. There were four tasks within this TA, which were to provide the ITER IO with: 1) Quality Assurance (QA) documentation for the MELCOR 1.8.2 Fusion code, 2) a pedigreed version of MELCOR 1.8.2, 3) assistance in MELCOR input deck development and accident analyses, and 4) support and assistance in the operation of the MELCOR 1.8.2. This report, which is the final report for this agreement, documents the completion of the work scope under this ITER TA, designated as TA 81-18.

  11. Committing to coal and gas: Long-term contracts, regulation, and fuel switching in power generation

    Science.gov (United States)

    Rice, Michael

    Fuel switching in the electricity sector has important economic and environmental consequences. In the United States, the increased supply of gas during the last decade has led to substantial switching in the short term. Fuel switching is constrained, however, by the existing infrastructure. The power generation infrastructure, in turn, represents commitments to specific sources of energy over the long term. This dissertation explores fuel contracts as the link between short-term price response and long-term plant investments. Contracting choices enable power plant investments that are relationship-specific, often regulated, and face uncertainty. Many power plants are subject to both hold-up in investment and cost-of-service regulation. I find that capital bias is robust when considering either irreversibility or hold-up due to the uncertain arrival of an outside option. For sunk capital, the rental rate is inappropriate for determining capital bias. Instead, capital bias depends on the regulated rate of return, discount rate, and depreciation schedule. If policies such as emissions regulations increase fuel-switching flexibility, this can lead to capital bias. Cost-of-service regulation can shorten the duration of a long-term contract. From the firm's perspective, the existing literature provides limited guidance when bargaining and writing contracts for fuel procurement. I develop a stochastic programming framework to optimize long-term contracting decisions under both endogenous and exogenous sources of hold-up risk. These typically include policy changes, price shocks, availability of fuel, and volatility in derived demand. For price risks, the optimal contract duration is the moment when the expected benefits of the contract are just outweighed by the expected opportunity costs of remaining in the contract. I prove that imposing early renegotiation costs decreases contract duration. Finally, I provide an empirical approach to show how coal contracts can limit

  12. Unfair contract terms and the consumer: ECJ case-law, foreign literature and their impact on Dutch law

    NARCIS (Netherlands)

    Hondius, E.H.

    2016-01-01

    Summary: In the late twentieth century, most European states have adopted legislation on unfair contract terms. The Directive 93/13/EEC on unfair terms in consumer contracts has effectively made the European Court of Justice (ECJ) the final arbiter in interpreting much of this legislation. The

  13. Support to LANL: Cost estimation. Final report

    International Nuclear Information System (INIS)

    1993-01-01

    This report summarizes the activities and progress by ICF Kaiser Engineers conducted on behalf of Los Alamos National Laboratories (LANL) for the US Department of Energy, Office of Waste Management (EM-33) in the area of improving methods for Cost Estimation. This work was conducted between October 1, 1992 and September 30, 1993. ICF Kaiser Engineers supported LANL in providing the Office of Waste Management with planning and document preparation services for a Cost and Schedule Estimating Guide (Guide). The intent of the Guide was to use Activity-Based Cost (ABC) estimation as a basic method in preparing cost estimates for DOE planning and budgeting documents, including Activity Data Sheets (ADSs), which form the basis for the Five Year Plan document. Prior to the initiation of the present contract with LANL, ICF Kaiser Engineers was tasked to initiate planning efforts directed toward a Guide. This work, accomplished from June to September, 1992, included visits to eight DOE field offices and consultation with DOE Headquarters staff to determine the need for a Guide, the desired contents of a Guide, and the types of ABC estimation methods and documentation requirements that would be compatible with current or potential practices and expertise in existence at DOE field offices and their contractors

  14. Final Report Fermionic Symmetries and Self consistent Shell Model

    International Nuclear Information System (INIS)

    Zamick, Larry

    2008-01-01

    In this final report in the field of theoretical nuclear physics we note important accomplishments.We were confronted with 'anomoulous' magnetic moments by the experimetalists and were able to expain them. We found unexpected partial dynamical symmetries--completely unknown before, and were able to a large extent to expain them. The importance of a self consistent shell model was emphasized.

  15. Environmental labelling of electricity delivery contracts in Sweden

    International Nuclear Information System (INIS)

    Kaaberger, Tomas

    2003-01-01

    Competition in the electricity market allows customers to choose between suppliers. As a consequence, customers may demand electricity from specified sources of energy. In Sweden, the Swedish Society for Nature Conservation (SSNC), operates a system of environmental labelling of electricity delivery contracts since 1996. Labelling is available for suppliers offering electricity from renewable sources of energy with some additional criteria. Companies may acquire a licence to use the label by showing ability to deliver such electricity and by agreeing to be audited. The system is private independent. It is operating on the bases of credibility earned by the SSNC during 90 years as an environmental organisation and 10 years as operator of environmental labelling of consumer products. The system is market oriented, compatible with WTO and EU market principles, and independent of governmental environmental restrictions, subsidy or quota systems. It is relying on voluntary agreements. The results are desirable if only a few by electricity under labelled contracts as well as if every customer do so. The market is growing. A majority of the suppliers have a license and may offer labelled contracts. In the year 2000, 7% of all electricity sold to final consumers was sold under labelled contracts

  16. Final Report: Mass Production Cost Estimation of Direct H2 PEM Fuel Cell Systems for Transportation Applications (2012-2016)

    Energy Technology Data Exchange (ETDEWEB)

    James, Brian David [Strategic Analysis Inc., Arlington, VA (United States); Huya-Kouadio, Jennie Moton [Strategic Analysis Inc., Arlington, VA (United States); Houchins, Cassidy [Strategic Analysis Inc., Arlington, VA (United States); DeSantis, Daniel Allen [Strategic Analysis Inc., Arlington, VA (United States)

    2016-09-01

    This report summarizes project activities for Strategic Analysis, Inc. (SA) Contract Number DE-EE0005236 to the U.S. Department of Energy titled “Transportation Fuel Cell System Cost Assessment”. The project defined and projected the mass production costs of direct hydrogen Proton Exchange Membrane fuel cell power systems for light-duty vehicles (automobiles) and 40-foot transit buses. In each year of the five-year contract, the fuel cell power system designs and cost projections were updated to reflect technology advances. System schematics, design assumptions, manufacturing assumptions, and cost results are presented.

  17. 77 FR 75766 - Federal Acquisition Regulation; Nondisplacement of Qualified Workers Under Service Contracts

    Science.gov (United States)

    2012-12-21

    ... invention, imagination, originality or talent in a recognized field of artistic or creative endeavor'' (29... recommended the final rule include language allowing contracting officers to submit a negative performance...

  18. Final Report - BRER Core Support

    International Nuclear Information System (INIS)

    Evan B. Douple

    2007-01-01

    This contract provided core support for activities of the advisory committee of experts comprising the Board on Radiation Effects Research (BRER), in The National Academies Division on Earth and Life Studies. That committee met two times during the funding period. The committee members provided oversight and advice regarding ongoing BRER projects and also assisted in the identification of potential committee members for new studies and the development of proposals for projects in the radiation sciences worthy for future study. In addition, funding provided support for the planning, advertisement, and invited speakers travel-expense reimbursement for the Third and Fourth Gilbert W. Beebe Symposia held at The National Academies on December 1, 2004 and on November 30, 2005, respectively

  19. Grimsel Test Site: heat test, final report

    International Nuclear Information System (INIS)

    Schneefuss, J.; Glaess, F.; Gommlich, G.; Schmidt, M.

    1989-05-01

    The Swiss concept for the storage of radioactive waste consists in placing it in compact, dense rock formations. An experiment 'Heat Test' carried out by the 'Gesellschaft fuer Strahlen- und Umweltforschung' in Nagra's Grimsel rock laboratory simulated the heat production of stored radioactive waste. The aim was to evaluate processes for the demonstration of the suitability of a final repository for heat-producing radioactive waste in cristalline rock, to investigate the thermic, mechanic and hydraulic reactions to an artificial heat source, and to develop corresponding calculating models. The duration of the tests was about 3 years. In this report the measured thermic, mechanic and hydraulic reactions are documented and discussed in detail. A simple, rotation symmetrical FEM-model was used for the preparatory and experiment-accompanying modelling of the thermomechanical conditions in the heat test. The test showed that suitable measuring methods for the surveillance of the geomechanics of a final repository are available and that the reactions of the crystalline host rock to the heat source remain locally limited and can be modelled with relatively small effort. 29 refs., 33 figs., 10 tabs

  20. Calculation of extreme wind atlases using mesoscale modeling. Final report

    DEFF Research Database (Denmark)

    Larsén, Xiaoli Guo; Badger, Jake

    This is the final report of the project PSO-10240 "Calculation of extreme wind atlases using mesoscale modeling". The overall objective is to improve the estimation of extreme winds by developing and applying new methodologies to confront the many weaknesses in the current methodologies as explai...