  1. Final generic environmental impact statement on decommissioning of nuclear facilities

    International Nuclear Information System (INIS)

    1988-08-01

    This final generic environmental impact statement was prepared as part of the requirement for considering changes in regulations on decommissioning of commercial nuclear facilities. Consideration is given to the decommissioning of pressurized water reactors, boiling water reactors, research and test reactors, fuel reprocessing plants (FRPs) (currently, use of FRPs in the commercial sector is not being considered), small mixed oxide fuel fabrication plants, uranium hexafluoride conversion plants, uranium fuel fabrication plants, independent spent fuel storage installations, and non-fuel-cycle facilities for handling byproduct, source and special nuclear materials. Decommissioning has many positive environmental impacts such as the return of possibly valuable land to the public domain and the elimination of potential problems associated with increased numbers of radioactively contaminated facilities with a minimal use of resources. Major adverse impacts are shown to be routine occupational radiation doses and the commitment of nominally small amounts of land to radioactive waste disposal. Other impacts, including public radiation doses, are minor. Mitigation of potential health, safety, and environmental impacts requires more specific and detailed regulatory guidance than is currently available. Recommendations are made as to regulatory decommissioning particulars including such aspects as decommissioning alternatives, appropriate preliminary planning requirements at the time of commissioning, final planning requirements prior to termination of facility operations, assurance of funding for decommissioning, environmental review requirements. 26 refs., 7 figs., 68 tabs

  2. Uranium milling, project M-25. Volume I. summary and text. Final generic environmental impact statement

    International Nuclear Information System (INIS)

    1980-09-01

    The Final Generic Environmental Impact Statement (GEIS) on Uranium Milling focuses primarily upon the matter of mill tailings disposal. It evaluates both the costs and benefits of alternative tailings disposal modes and draws conclusions about criteria which should be incorporated into regulations. Both institutional and technical controls are evaluated. Health impacts considered were both short and long term. Restatement and resolution of all public comments received on the draft (GEIS) are presented. There are three volumes: Volume I is the main text and Volumes II and III are supporting appendices

  3. Generic environmental impact statement for license renewal of nuclear plants. Final report

    International Nuclear Information System (INIS)

    1996-05-01

    This GEIS examines the possible environmental impacts that could occur as a result of renewing the licenses of individual nuclear power plants under 10 CFR 54. To the extent possible, it establishes the bounds and significance of these potential impacts. The analysis encompasses all operating light-water reactors. For each type of environmental impact, the GEIS attempts to establish generic findings covering as many plants as possible. While plant and site-specific information is used in developing the generic findings, the NRC does not intend for the GEIS to be a compilation of individual plant environmental impacts statements. This document has three principal objectives: (1) to provide an understanding of the types and severity of environmental impacts that may occur as a result of license renewal, (2) to identify and assess those impacts that are expected to be generic to license renewal, and (3) to support rulemaking (10 CFR 51) to define the number and scope of issues that need to be addressed by the applicants in plant-by-plant license renewal proceedings

  4. Generic environmental impact statement in support of rulemaking on radiological criteria for license termination of NRC-licensed nuclear facilities. Final report, appendices A and B

    International Nuclear Information System (INIS)

    1997-07-01

    The action being considered in this Final Generic Environmental Impact Statement (GEIS) is an amendment to the Nuclear Regulatory Commission''s (NRC) regulations in 10 CFR Part 20 to include radiological criteria for decommissioning of lands and structures at nuclear facilities. Under the National Environmental Policy Act (NEPA), all Federal agencies must consider the effect of their actions on the environment. To fulfill NRC''s responsibilities under NEPA, the Commission is preparing this GEIS which analyzes alternative courses of action and the costs and impacts associated with those alternatives. In preparing the final GEIS, the following approach was taken: (1) a listing was developed of regulatory alternatives for establishing radiological criteria for decommissioning; (2) for each alternative, a detailed analysis and comparison of incremental impacts, both radiological and nonradiological, to workers, members of the public, and the environment, and costs were performed; and (3) based on the analysis of impacts and costs, conclusions on radiological criteria for decommissioning were provided. Contained in the GEIS are results and conclusions related to achieving, as an objective of decommissioning ALARA, reduction to preexisting background, the radiological criterion for unrestricted use, decommissioning ALARA analysis for soils and structures containing contamination, restricted use and alternative analysis for special site-specific situations and groundwater cleanup. In its analyses, the final GEIS includes consideration of comments made on the draft GEIS during the public comment period

  5. Generic environmental impact statement in support of rulemaking on radiological criteria for license termination of NRC-licensed nuclear facilities. Final report, main report

    International Nuclear Information System (INIS)

    1997-07-01

    The action being considered in this Final Generic Environmental Impact Statement (GEIS) is an amendment to the Nuclear Regulatory Commission's (NRC) regulations in 10 CFR Part 20 to include radiological criteria for decommissioning of lands and structures at nuclear facilities. Under the National Environmental Policy Act (NEPA), all Federal agencies must consider the effect of their actions on the environment. To fulfill NRC's responsibilities under NEPA, the Commission is preparing this GEIS which analyzes alternative courses of action and the costs and impacts associated with those alternatives. In preparing the final GEIS, the following approach was taken: (1) a listing was developed of regulatory alternatives for establishing radiological criteria for decommissioning; (2) for each alternative, a detailed analysis and comparison of incremental impacts, both radiological and nonradiological, to workers, members of the public, and the environment, and costs, were performed; and (3) based on the analysis of impacts and costs, conclusions on radiological criteria for decommissioning were provided. Contained in the GEIS are results and conclusions related to achieving, as an objective of decommissioning ALARA, reduction to preexisting background, the radiological criterion for unrestricted use, decommissioning ALARA analysis for soils and structures containing contamination, restricted use and alternative analysis for special site specific situations, and groundwater cleanup. In its analyses, the final GEIS includes consideration of comments made on the draft GEIS during the public comment period

  6. Final generic environmental statement on the use of recycle plutonium in mixed oxide fuel in light water cooled reactors. Volume 5. Public comments and Nuclear Regulatory Commission responses

    International Nuclear Information System (INIS)

    1976-08-01

    Copies of 69 letters are presented commenting on the Draft Generic Environmental Statement (GESMO) WASH-1327 and the NRC's responses to the comments received from Federal, State and local agencies; environmental and public interest groups, members of the academic and industrial communities, and individual citizens. An index to these letters indicating the number assigned to each letter, the author, and organization represented, is provided in the Table of Contents

  7. Final generic environmental statement on the use of recycle plutonium in mixed oxide fuel in light water cooled reactors. Volume 5. Public comments and Nuclear Regulatory Commission responses

    Energy Technology Data Exchange (ETDEWEB)

    1976-08-01

    Copies of 69 letters are presented commenting on the Draft Generic Environmental Statement (GESMO) WASH-1327 and the NRC's responses to the comments received from Federal, State and local agencies; environmental and public interest groups, members of the academic and industrial communities, and individual citizens. An index to these letters indicating the number assigned to each letter, the author, and organization represented, is provided in the Table of Contents.

  8. Final generic environmental statement on the use of recycle plutonium in mixed oxide fuel in light water cooled reactors. Volume 2

    International Nuclear Information System (INIS)

    1976-08-01

    This environmental statement assesses the impacts of the implementation of plutonium recycle in the LWR industry. It is based on assumptions that are intended to reflect conservatively an acceptable level of the application of current technology. It is not intended to be a representation of the ''as low as reasonably achievable'' (ALARA) philosophy. This generic environmental statement discusses the anticipated effects of recycling plutonium in light water nuclear power reactors. It is based on about 30 years of experience with the element in the context of a projected light water nuclear power industry that is already substantial. A background perspective on plutonium, its safety, and its recycling as a reactor fuel is presented

  9. Final Generic Environmental Impact Statement. Handling and storage of spent light water power reactor fuel. Volume 1. Executive summary and text

    International Nuclear Information System (INIS)

    1979-08-01

    The Generic Environmental Impact Statement on spent fuel storage was prepared by the Nuclear Regulatory Commission staff in response to a directive from the Commissioners published in the Federal Register, September 16, 1975 (40 FR 42801). The Commission directed the staff to analyze alternatives for the handling and storage of spent light water power reactor fuel with particular emphasis on developing long range policy. Accordingly, the scope of this statement examines alternative methods of spent fuel storage as well as the possible restriction or termination of the generation of spent fuel through nuclear power plant shutdown. Volume 1 includes the executive summary and the text

  10. Applicability of federal and state environmental requirements to selected DOE field installations and recommendations for development of generic compliance guidance. Final report

    International Nuclear Information System (INIS)

    1982-01-01

    This final report identifies and describes federal and state environmental requirements applicable to selected Department of Energy (DOE) nuclear field installations, establishes priorities for the requirements, determines the need for development of additional compliance guidance, and recommends development of compliance guidance for specific priority requirements. Compliance guidance developed as part of the study is summarized. The applicability of environmental requirements to 12 DOE field installations was reviewed. Five installations were examined under Task 4. They are: Nevada Test Site; Lawrence Berkeley Laboratory; Paducah Gaseous Diffusion Plant; Oak Ridge Y-12 Plant; and Los Alamos Scientific Laboratory. Seven other installations were reviewed under Task 2 and included: Idaho National Engineering Laboratory; Hanford; Savannah River Plant; Oak Ridge Gaseous Diffusion Plant; Pantex Plant; Rocky Flats Plant; and Lawrence Livermore Laboratory. This report combines results of the two tasks. The objective of the study was to identify the set of environmental requirements which are applicable to DOE field installations, track changes in the requirements, and prepare compliance guidance for important requirements and important regulatory developments as necessary. A cumulative calendar update for July 1982 represents the current status of applicable requirements. Environmental profiles of each facility, along with ambient monitoring results, are presented. Applicable federal requirements are identified. The specific applicability of federal and state requirements is detailed for each installation. Compliance guidance available from various agencies is described. Each requirement described is ranked by priority, and recommendations are made for development of additional guidance

  11. Final generic environmental statement on the routine use of plutonium-powered cardiac pacemakers. Update of information on power sources for pacemakers

    International Nuclear Information System (INIS)

    1979-05-01

    The Final Environmental Statement on Routine Use of Plutonium-Powered Cardiac Pacemakers (FES) was issued in July 1976. Supplement 1, prepared in 1978, updates the FES with respect to power sources for pacemakers. Particular attention is given to the non-nuclear lithium batteries as alternatives to 238-Pu power sources in pacemakers. Supplement 1 also considers the current extent of pacemaker use and makeup of the patient population and concludes that the FES' conclusion is still valid that distribution of 238-Pu powered pacemakers for routine use should be authorized subject to specific conditions

  12. Developing a generic environmental safety case

    International Nuclear Information System (INIS)

    Bailey, Lucy

    2014-01-01

    The Nuclear Decommissioning Authority (NDA) has been charged with implementing the United Kingdom government's policy for the long-term management of higher activity radioactive waste by planning, building and operating a geological disposal facility (GDF). Within the NDA, we - the Radioactive Waste Management Directorate (RWMD) - are tasked with the development of a GDF. The UK government has also decided that a process of voluntarism and partnership will be followed to identify a suitable site for the GDF. To date there is no volunteer community and the site selection process to find a volunteer host community is under review. RWMD has an ongoing role to provide advice to UK radioactive waste producers on the conditioning and packaging of wastes and to undertake disposability assessments of waste packaging proposals to determine their suitability for eventual disposal in a GDF. We also need to demonstrate our confidence that a GDF would be safe. Therefore RWMD has published a generic Environmental Safety Case (ESC) (NDA, 2010) to demonstrate that we are confident that a GDF could be developed to meet the guidelines set down by the environmental regulators (EA/NIEA, 2009) in a range of geological settings. The ESC includes reference case calculations that are used as a benchmark for disposability assessments. (author)

  13. 78 FR 37325 - License Renewal of Nuclear Power Plants; Generic Environmental Impact Statement and Standard...

    Science.gov (United States)

    2013-06-20

    ... Nuclear Power Plants; Generic Environmental Impact Statement and Standard Review Plans for Environmental... for Nuclear Power Plants, Supplement 1: Operating License Renewal'' (ESRP). The ESRP serves as a guide... published a final rule, ``Revisions to Environmental Review for Renewal of Nuclear Power Plant Operating...

  14. Final generic environmental statement on the use of recycle plutonium in mixed oxide fuel in light water cooled reactors. Volume 4

    International Nuclear Information System (INIS)

    1976-08-01

    Information concerning the use of plutonium recycle in water cooled reactors is presented under the following chapter headings: probable adverse environmental effects that cannot be avoided; means for mitigating adverse environmental effects; alternative dispositions of plutonium; relationship between local short term uses of man's environment and the maintenance and enhancement of long term productivity; irreversible and irretrievable commitments of resources; and economic analysis and cost-benefit balancing

  15. Final generic environmental statement on the use of recycle plutonium in mixed oxide fuel in light water cooled reactors. Volume 3

    International Nuclear Information System (INIS)

    1976-08-01

    An assessment is presented of the health, safety and environmental effects of the entire light water reactor fuel cycle, considering the comparative effects of three major alternatives: no recycle, recycle of uranium only, and recycle of both uranium and plutonium. The assessment covers the period from 1975 through the year 2000 and includes the cumulative effects for the entire period as well as projections for specific years. Topics discussed include: the light water reactor with plutonium recycle; mixed oxide fuel fabrication; reprocessing plant operations; supporting uranium fuel cycle; transportation of radioactive materials; radioactive waste management; storage of plutonium; radiological health assessment; extended spent fuel storage; and blending of plutonium and uranium at reprocessing plants

  16. Generic environmental impact statement for license renewal of nuclear plants

    International Nuclear Information System (INIS)

    1996-05-01

    Volume 2 of the Generic Environmental Impact Statement for License Renewal of Nuclear Plants contains the appendices. These include: (A) General characterisitics and environmental settings of domestic nuclear plants, (B) Definition of impact initiators, (C) Socioeconomics and case studies, (D) Aquatic organisms and human health, (E) Radiation protection considerations, (F) Methodology for assessing impacts to aquatic ecology and water resources, (G) Postulated accidents, and (H) Environmental statutes and regulations affecting license renewal

  17. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 3, Appendix M, Contract Copies.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This report, is part of the final environmental impact statement of the Bonneville Power Administration, consists of an appendix of contract copies related to the following: Detailed Index to Generic Utility Power Sales Contracts, Text of Generic Utility Contract, Detailed Index to Generic DSI Power Sales Contracts, Text of Generic DSI Contract, Text of Residential Purchase and Sale Agreement (Residential Exchange), and Detailed Index to General Contract Provisions -- GCP Form PSC-2 (Incorporated into all three types of contracts as an Exhibit).

  18. INEL Geothermal Environmental Program. Final environmental report

    Energy Technology Data Exchange (ETDEWEB)

    Thurow, T.L.; Cahn, L.S.

    1982-09-01

    An overview of environmental monitoring programs and research during development of a moderate temperature geothermal resource in the Raft River Valley is presented. One of the major objectives was to develop programs for environmental assessment and protection that could serve as an example for similar types of development. The monitoring studies were designed to establish baseline conditions (predevelopment) of the physical, biological, and human environment. Potential changes were assessed and adverse environmental impacts minimized. No major environmental impacts resulted from development of the Raft River Geothermal Research Facility. The results of the physical, biological, and human environment monitoring programs are summarized.

  19. Multiplied Environmental Literacy. Final Report.

    Science.gov (United States)

    Buethe, Chris

    This booklet presents a pupil-oriented program designed to increase the environmental literacy of teachers and students in Indiana schools through a programmed multiplier effect. Junior and senior high school science teachers were prepared to teach students the meanings of 44 selected environmental terms and related concepts. Those teachers then…

  20. Environmental Prosperity Game. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Berman, M.; Boyack, K.; VanDevender, J.P.

    1995-12-01

    Prosperity Games are an outgrowth and adaptation of move/countermove and seminar War Games. Prosperity Games are simulations that explore complex issues in a variety of areas including economics, politics, sociology, environment, education and research. These issues can be examined from a variety of perspectives ranging from a global, macroeconomic and geopolitical viewpoint down to the details of customer/supplier/market interactions in specific industries. All Prosperity Games are unique in that both the game format and the player contributions vary from game to game. This report documents the Environmental Prosperity Game conducted under the sponsorship of the Silicon Valley Environmental Partnership. Players were drawn from all stakeholders involved in environmental technologies including small and large companies, government, national laboratories, universities, environmentalists, the legal profession, finance, and the media. The primary objectives of this game were to: investigate strategies for developing a multi-agency (national/state/regional), one-step regulatory approval process for certifying and implementing environmental technologies and evaluating the simulated results; identify the regulatory hurdles and requirements, and the best approaches for surmounting them; identify technical problems and potential resources (environmental consultants, labs, universities) for solving them. The deliberations and recommendations of these players provided valuable insights as to the views of this diverse group of decision makers concerning environmental issues, including the development, licensing, and commercialization of new technologies.

  1. 78 FR 57538 - Proposed Waste Confidence Rule and Draft Generic Environmental Impact Statement

    Science.gov (United States)

    2013-09-19

    ..., Chief, Communication, Planning, and Rulemaking Branch Waste Confidence Directorate, Office of Nuclear...-2012-0246] RIN 3150-AJ20 Proposed Waste Confidence Rule and Draft Generic Environmental Impact... disposal (proposed Waste Confidence rule). In addition, the NRC will receive public comment on its...

  2. 77 FR 14416 - Notice of Availability of a Final Environmental Impact Statement and Final Environmental Impact...

    Science.gov (United States)

    2012-03-09

    ...In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), and the Federal Land Policy and Management Act of 1976, as amended (FLPMA), the Bureau of Land Management (BLM) has prepared a Proposed California Desert Conservation Area (CDCA) Plan Amendment (PA)/Final Environmental Impact Statement (EIS) and Final Environmental Impact Report (EIR) for the Ocotillo Express Wind Energy Facility (OWEF) and by this notice is announcing the availability of the Proposed PA and Final EIS/EIR.

  3. Final design of the generic equatorial port plug structure for ITER diagnostic systems

    International Nuclear Information System (INIS)

    Udintsev, V.S.; Maquet, P.; Alexandrov, E.; Casal, N.; Cuenca, D.; Drevon, J.-M.; Feder, R.; Friconneau, J.P.; Giacomin, T.; Guirao, J.; Iglesias, S.; Josseaume, F.; Levesy, B.; Loesser, D.; Ordieres, J.; Quinn, E.; Pak, S.; Penot, C.; Pitcher, C.S.; Portalès, M.

    2015-01-01

    The Diagnostic Generic Equatorial Port Plug (GEPP) is designed to be common to all equatorial port-based diagnostic systems. It is designed to survive throughout the lifetime of ITER for 20 years, 30,000 discharges, and 3000 disruptions. The EPP structure dimensions (without Diagnostic First Walls and Diagnostic Shield Modules) are L2.9 × W1.9 × H2.4 m"3. The length of the fully integrated EPP is 3174 mm. The weight of the EPP structure is about 15 t, whereas the total weight of the integrated EPP may be up to 45 t. The EPP structure provides a flexible platform for a variety of diagnostics. The Diagnostic Shield Module assemblies, or drawers, allow a modular approach with respect to diagnostic integration and maintenance. In the nuclear phase of ITER operations, they will be remotely inserted into the EPP structure in the Hot Cell Facility. The port plug structure must also contribute to the nuclear shielding, or plugging, of the port and further contain circulated water to allow cooling during operation and heating during bake-out. The Final Design of the GEPP has been successfully passed in late 2013 and is now heading toward manufacturing. The final design of the GEPP includes interfaces, manufacturing, R&D, operation and maintenance, load cases and analysis of failure modes.

  4. Non-Federal participation in AC Intertie: Final environmental impact statement

    International Nuclear Information System (INIS)

    1994-01-01

    This document contains the appendices for the Non-Federal Participation in AC Intertie Final Environmental Impact Statement. It contains all the supporting materials, documents and data for the EIS in nine appendices: A. Life-of-facilities capacity ownership proposal; B. Long-term Intertie access policy; C. Glossary; D. Biological assessment and supporting materials; E. Environmental impacts of generic resource types; F. Technical information on analysis methods and results; G. Affected environment supporting documentation; H. Public involvement activities; and I. Bibliography

  5. Generic models and parameters for assessing the environmental transfer of radionuclides from routine releases

    International Nuclear Information System (INIS)

    1982-01-01

    This report is addressed to national regulatory bodies and technical and administrative personnel responsible for performing environmental impact analyses, in particular for generic assessments of doses to most exposed individuals from routine releases of radioactive effluents to atmospheric and aquatic environments. The concern of society in general for the quality of the environment and the realization that all human activities have some environmental effect, in which actions and reactions are coupled in a complex but predictable manner, have led to the development of a procedure for environmental impact analysis. This procedure is a predictive one, which tries to forecast probable environmental effects before some action, such as the construction and operation of a nuclear power station, is decided upon. The method of prediction is by the application of models that attempt to describe the environmental processes in mathematical terms in order to produce a quantitative result which can be used in the decision-making process

  6. Final design of the generic upper port plug structure for ITER diagnostic systems

    Energy Technology Data Exchange (ETDEWEB)

    Pak, Sunil, E-mail: paksunil@nfri.re.kr [National Fusion Research Institute, Daejeon (Korea, Republic of); Feder, Russell [Princeton Plasma Physics Laboratory, Princeton, NJ (United States); Giacomin, Thibaud; Guirao, Julio; Iglesias, Silvia; Josseaume, Fabien [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul-lez-Durance (France); Kalish, Michael; Loesser, Douglas [Princeton Plasma Physics Laboratory, Princeton, NJ (United States); Maquet, Philippe [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul-lez-Durance (France); Ordieres, Javier; Panizo, Marcos [NATEC, Ingenieros, Gijón (Spain); Pitcher, Spencer; Portalès, Mickael [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul-lez-Durance (France); Proust, Maxime [CEA, Cadarache, St. Paul-lez-Durance (France); Ronden, Dennis [FOM Institute DIFFER, Nieuwegein (Netherlands); Serikov, Arkady [Karlsruhe Institute of Technology, Eggenstein-Leopoldshafen (Germany); Suarez, Alejandro [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul-lez-Durance (France); Tanchuk, Victor [NIIEFA, St.-Petersburg (Russian Federation); Udintsev, Victor; Vacas, Christian [ITER Organization, Route de Vinon sur Verdon, 13115 St Paul-lez-Durance (France); and others

    2016-01-15

    The generic upper port plug (GUPP) structure in ITER is a 6 m long metal box which deploys diagnostic components into the vacuum vessel. This structure is commonly used for all the diagnostic upper ports. The final design of the GUPP structure, which has successfully passed the final design review in 2013, is described here. The diagnostic port plug is cantilevered to the vacuum vessel with a heavy payload at the front, so called the diagnostic first wall (DFW) and the diagnostic shield module (DSM). Most of electromagnetic (EM) load (∼80%) occurs in DFW/DSM. Therefore, the mounting design to transfer the EM load from DFW/DSM to the GUPP structure is challenging, which should also comply with thermal expansion and tolerance for assembly and manufacturing. Another key design parameter to be considered is the gap between the port plug and the vacuum vessel port. The gap should be large enough to accommodate the remote handling of the heavy port plug (max. 25 t), the structural deflection due to external loads and machine assembly tolerance. At the same time, the gap should be minimized to stop the neutron streaming according to the ALARA (as low as reasonably achievable) principle. With these design constraints, the GUPP structure should also provide space for diagnostic integration as much as possible. This requirement has led to the single wall structure having the gun-drilled water channels inside the structure. Furthermore, intensive efforts have been made on the manufacturing study including material selection, manufacturing codes and French regulation related to nuclear equipment and safety. All these main design and manufacturing aspects are discussed in this paper, including requirements, interfaces, loads and structural assessment and maintenance.

  7. Contribution to draft generic environmental impact statement on commercial waste management: radioactive waste isolation in geologic formations

    International Nuclear Information System (INIS)

    1978-04-01

    This document concentrates on deep geologic isolation of wastes in bedded salt, granite, shale, and basalt with emphasis on wastes from three fuel cycles: reprocessing wastes from uranium and plutonium recycling, reprocessing wastes from uranium-only recycling, and spent unreprocessed fuel with no recycling. The analyses presented in this document are based on preconceptual repository designs. As the repository designs progress through future phases, refinements will occur which might modify some of these results. The 12 sections in the report are: introduction; selection and description of generic repository sites; LWR wastes to be isolated in geologic formations; description of waste isolation facilities; effluents from the waste isolation facility; assessment of environment impacts for various geographical locations of a waste isolation facility; environmental monitoring; decommissioning; mine decommissioning site restoration; deep geologic alternative actions; potential mechanisms of containment failure; and considerations relevant to provisional versus final storage

  8. Uranium milling: Volume 1, Summary and text: Generic environmental impact statement: Draft

    International Nuclear Information System (INIS)

    1979-04-01

    This generic environmental impact statement on uranium milling has been prepared in accordance with a notice of intent published by the Nuclear Regulatory Commission (NRC). The purpose of the statement is to assess the potential environmental impacts of uranium milling operations, in a programmatic context, including the management of uranium mill tailings, and to provide an opportunity for public participation in decisions on any proposed changes in NRC regulations based on this assessment. The principal objectives of the statement are to assess the nature and extent of the environmental impacts of uranium milling in the United states from local, regional, and national perspectives on both short- and long-term bases, to determine what regulatory actions are needed; to provide information on which to determine what regulatory requirements for management and disposal of mill tailings and mill decommissioning should be; and to support any rule makings that may be determined to be necessary. 39 figs., 130 tabs

  9. 76 FR 65746 - Notice of Availability of Joint Final Environmental Impact Statement/Final Environmental Impact...

    Science.gov (United States)

    2011-10-24

    ...In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), and the Federal Land Policy and Management Act of 1976, as amended (FLPMA), the Bureau of Land Management (BLM) and the California Public Utilities Commission (CPUC) have prepared a Final Environmental Impact Statement (EIS) and Final Environmental Impact Report (EIR) as a joint environmental analysis document for Tule Wind, LLC's Tule Wind Project (Tule Project) and the San Diego Gas and Electric's (SDG&E) East County Substation Project (ECO Project) and by this notice are announcing the availability of the Final EIS/EIR. By this Notice the BLM is also segregating the public lands within the Tule Project application area from appropriation under the public land laws including the Mining Law, but not the Mineral Leasing or Material Sales Act, for a period of 2 years.

  10. Final Environmental Impact Statement Resource Programs

    International Nuclear Information System (INIS)

    1993-02-01

    BPA's preferred alternative is the Emphasize Conservation Alternative. System and environmental costs are low. Environmental impacts from conservation are minimal. This alternative is cost-effective and environmentally responsible; only the High Conservation Alternative has lower costs and fewer environmental impacts. However, there is some concern about the cost-effectiveness, reliability, and commercial availability of the high conservation resources. If the supply of the additional conservation potential was confirmed and it became cost-effective, the High Conservation Alternative would be preferred. The Draft Resource Programs EIS was released for public review during the summer of 1992. Comments received by letter or in the public hearing held June 16, 1992, were used to revise and update data and analyses of the EIS (public comments and BPA's responses are contained in Volume III of the Final EIS). In addition, a number of revisions were made in the Chapter 3 material describing each resource type, and in Chapter 4 and the Summary, to assure consistency with the modeling and analysis in Chapter 5. Additional information about the capacity aspects of each resource type and alternative has been added, and the material on conservation and its impacts has been reorganized

  11. Validation of generic cost estimates for construction-related activities at nuclear power plants: Final report

    International Nuclear Information System (INIS)

    Simion, G.; Sciacca, F.; Claiborne, E.; Watlington, B.; Riordan, B.; McLaughlin, M.

    1988-05-01

    This report represents a validation study of the cost methodologies and quantitative factors derived in Labor Productivity Adjustment Factors and Generic Methodology for Estimating the Labor Cost Associated with the Removal of Hardware, Materials, and Structures From Nuclear Power Plants. This cost methodology was developed to support NRC analysts in determining generic estimates of removal, installation, and total labor costs for construction-related activities at nuclear generating stations. In addition to the validation discussion, this report reviews the generic cost analysis methodology employed. It also discusses each of the individual cost factors used in estimating the costs of physical modifications at nuclear power plants. The generic estimating approach presented uses the /open quotes/greenfield/close quotes/ or new plant construction installation costs compiled in the Energy Economic Data Base (EEDB) as a baseline. These baseline costs are then adjusted to account for labor productivity, radiation fields, learning curve effects, and impacts on ancillary systems or components. For comparisons of estimated vs actual labor costs, approximately four dozen actual cost data points (as reported by 14 nuclear utilities) were obtained. Detailed background information was collected on each individual data point to give the best understanding possible so that the labor productivity factors, removal factors, etc., could judiciously be chosen. This study concludes that cost estimates that are typically within 40% of the actual values can be generated by prudently using the methodologies and cost factors investigated herein

  12. 10 CFR 51.93 - Distribution of final environmental impact statement and supplement to final environmental impact...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of final environmental impact statement and supplement to final environmental impact statement; news releases. 51.93 Section 51.93 Energy NUCLEAR... Environmental Impact Statements-General Requirements § 51.93 Distribution of final environmental impact...

  13. Critical outlook and trends for environmental reference materials at the Measurements & Testing Generic Activity (European Commission).

    Science.gov (United States)

    Quevauviller, P; Bennink, D; Bøwadt, S

    2001-05-01

    It is now well recognised that the quality control (QC) of all types of analyses, including environmental analyses depends on the appropriate use of reference materials. One of the ways to check the accuracy of methods is based on the use of Certified Reference Materials (CRMs), whereas other types of (not certified) Reference Materials (RMs) are used for routine quality control (establishment of control charts) and interlaboratory testing (e.g. proficiency testing). The perception of these materials, in particular with respect to their production and use, differs widely according to various perspectives (e.g. RM producers, routine laboratories, researchers). This review discusses some critical aspects of RM use and production for the QC of environmental analyses and describes the new approach followed by the Measurements & Testing Generic Activity (European Commission) to tackle new research and production needs.

  14. Southpoint power plant final environmental impact statement

    International Nuclear Information System (INIS)

    1999-01-01

    This document is the Final Environmental Impact Statement (FEIS) for a proposed lease of acreage on the Fort Mojave Indian Reservation in Mohave County, Arizona for development of a natural gas fired 500 megawatt combined cycle power plant. The Bureau of Indian Affairs (BIA) serves as the federal lead agency and the Fort Mojave Indian Tribe (FMIT) and the Western Area Power Administration (WAPA) are cooperating agencies for the EIS process. The purpose of this document is to provide information to the public and to interested public agencies regarding the environmental consequences of the approval of a long-term lease for the construction and operation of the proposed Southpoint power plant. The FEIS, prepared by Hallock/Gross, Inc. under the direction of the BIA and in cooperation with the FMIT and WAPA, addresses the comparative analysis of alternatives and evaluates the environmental consequences of such alternatives on various resources and addresses public comments. A number of technical reports were used in the preparation of the Draft EIS and FEIS and are available for review as Appendices to this document under separate cover that can be reviewed at the BIA offices which are listed

  15. 40 CFR 124.61 - Final environmental impact statement.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Final environmental impact statement... environmental impact statement. No final NPDES permit for a new source shall be issued until at least 30 days after the date of issuance of a final environmental impact statement if one is required under 40 CFR 6...

  16. 23 CFR 771.125 - Final environmental impact statements.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Final environmental impact statements. 771.125 Section... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.125 Final environmental impact statements. (a)(1..., economic, or environmental impacts of the action may need to be more fully explored; (iii) the impacts of...

  17. Mark III LOCA-related hydrodynamic load definition. Generic technical activity B-10. Final report

    International Nuclear Information System (INIS)

    Fields, M.B.; Kudrick, J.A.

    1984-08-01

    This report, prepared by the staff of the Office of Nuclear Reactor Regulation and its consultants at the Brookhaven National Laboratory, provides a discussion of LOCA-related suppression pool hydrodynamic loads in boiling water reactor (BWR) facilities with the Mark III pressure-suppression containment design. Its issuance completes NRC Generic Technical Activity B-10, Behavior of BWR Mark III Containment. On the basis of certain large-scale tests conducted between 1973 and 1979, the General Electric Company developed LOCA-related hydrodynamic load definitions for use in the design of the standard Mark III containment. The staff and its consultants have reviewed these load definitions and their bases and conclude that, with a few specified changes, the proposed load definitions provide conservative loading conditions. The staff approved acceptance criteria for LOCA-related hydrodynamic loads are provided in an appendix

  18. 16 CFR 1.85 - Final environmental impact statements.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Final environmental impact statements. 1.85... Final environmental impact statements. (a) After the close of the comment period, the Bureau responsible for the matter will consider the comments received on the draft environmental impact statement and...

  19. Generic Escherichia coli Contamination of Spinach at the Preharvest Stage: Effects of Farm Management and Environmental Factors

    Science.gov (United States)

    Navratil, Sarah; Gregory, Ashley; Bauer, Arin; Srinath, Indumathi; Jun, Mikyoung; Szonyi, Barbara; Nightingale, Kendra; Anciso, Juan; Ivanek, Renata

    2013-01-01

    The objective of this study was to determine the effects of farm management and environmental factors on preharvest spinach contamination with generic Escherichia coli as an indicator of fecal contamination. A repeated cross-sectional study was conducted by visiting spinach farms up to four times per growing season over a period of 2 years (2010 to 2011). Spinach samples (n = 955) were collected from 12 spinach farms in Colorado and Texas as representative states of the Western and Southwestern United States, respectively. During each farm visit, farmers were surveyed about farm-related management and environmental factors using a questionnaire. Associations between the prevalence of generic E. coli in spinach and farm-related factors were assessed by using a multivariable logistic regression model including random effects for farm and farm visit. Overall, 6.6% of spinach samples were positive for generic E. coli. Significant risk factors for spinach contamination with generic E. coli were the proximity (within 10 miles) of a poultry farm, the use of pond water for irrigation, a >66-day period since the planting of spinach, farming on fields previously used for grazing, the production of hay before spinach planting, and the farm location in the Southwestern United States. Contamination with generic E. coli was significantly reduced with an irrigation lapse time of >5 days as well as by several factors related to field workers, including the use of portable toilets, training to use portable toilets, and the use of hand-washing stations. To our knowledge, this is the first report of an association between field workers' personal hygiene and produce contamination with generic E. coli at the preharvest level. Collectively, our findings support that practice of good personal hygiene and other good farm management practices may reduce produce contamination with generic E. coli at the preharvest level. PMID:23666336

  20. Generic Escherichia coli contamination of spinach at the preharvest stage: effects of farm management and environmental factors.

    Science.gov (United States)

    Park, Sangshin; Navratil, Sarah; Gregory, Ashley; Bauer, Arin; Srinath, Indumathi; Jun, Mikyoung; Szonyi, Barbara; Nightingale, Kendra; Anciso, Juan; Ivanek, Renata

    2013-07-01

    The objective of this study was to determine the effects of farm management and environmental factors on preharvest spinach contamination with generic Escherichia coli as an indicator of fecal contamination. A repeated cross-sectional study was conducted by visiting spinach farms up to four times per growing season over a period of 2 years (2010 to 2011). Spinach samples (n = 955) were collected from 12 spinach farms in Colorado and Texas as representative states of the Western and Southwestern United States, respectively. During each farm visit, farmers were surveyed about farm-related management and environmental factors using a questionnaire. Associations between the prevalence of generic E. coli in spinach and farm-related factors were assessed by using a multivariable logistic regression model including random effects for farm and farm visit. Overall, 6.6% of spinach samples were positive for generic E. coli. Significant risk factors for spinach contamination with generic E. coli were the proximity (within 10 miles) of a poultry farm, the use of pond water for irrigation, a >66-day period since the planting of spinach, farming on fields previously used for grazing, the production of hay before spinach planting, and the farm location in the Southwestern United States. Contamination with generic E. coli was significantly reduced with an irrigation lapse time of >5 days as well as by several factors related to field workers, including the use of portable toilets, training to use portable toilets, and the use of hand-washing stations. To our knowledge, this is the first report of an association between field workers' personal hygiene and produce contamination with generic E. coli at the preharvest level. Collectively, our findings support that practice of good personal hygiene and other good farm management practices may reduce produce contamination with generic E. coli at the preharvest level.

  1. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 2, Appendices A--L.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This report consists of appendices A-L of the final environmental impact statement for the Bonneville Power Administration. The appendices provide information on the following: Ninth circuit Court opinion in Forelaws on Board v. Johnson; guide to Northwest Power act contracts; guide to hydro operations; glossary; affected environment supporting documentation; environmental impacts of generic resource types; information on models used; technical information on analysis; public involvement activities; bibliography; Pacific Northwest Electric Power Planning and Conservation Act; and biological assessment. (CBS)

  2. Exploring the Knowledge and Perception of Generic Medicines among Final Year Undergraduate Medical, Pharmacy, and Nursing Students in Sierra Leone: A Comparative Cross-Sectional Approach

    Directory of Open Access Journals (Sweden)

    Peter Bai James

    2018-01-01

    Full Text Available Most low-income nations have national medicine policy that emphasized the use of generic medicines in the public health sector. However, the use of generics is often debatable as there are concerns over its efficacy, quality, and safety compared to their branded counterparts. This study was conducted to compare the knowledge and perception of generic medicines among final year undergraduate medical, pharmacy, and nursing students in Sierra Leone. We conducted a questionnaire-based cross-sectional study among these students at the College of Medicine and Allied Health Sciences University of Sierra Leone. Out of the 62 students, only two (2/62, 3.2% knew about the acceptable bioequivalence limit. At least half of respondents in all three groups agreed that all generics are therapeutically equivalent to their innovator brand. At least half of the medicine (21/42, 50% and nursing (6/9, 66.6% students, compared to pharmacy students (5/11, 45.5%, believed that higher safety standards are required for proprietary medicines than for generic medicines. Most of them agreed that they need more information on the safety, quality, and efficacy aspects of generics (59/62, 95.2%. All three groups of healthcare students, despite variations in their responses, demonstrated a deficiency in knowledge and misconception regarding generic medicines. Training on issues surrounding generic drugs in healthcare training institutions is highly needed among future healthcare providers in Sierra Leone.

  3. Sectoral Costs of Environmental Policy. Final Report

    International Nuclear Information System (INIS)

    Vercaemst, P.; Vanassche, S.; Campling, P.; Vranken, L.; Agnolucci, P.; Salmons, R.; Shaw, B.; Jantzen, J.; Van der Woerd, H.; Gruenig, M.; Best, A.

    2007-12-01

    The Directorate General for Environment of the European Commission has launched a study on the 'Sectoral costs of environmental policy'. The overall aim of the study is to obtain a clearer picture of the impact of environmental policy in some of the industrial sectors most affected by environmental policy, taking into account the differences between sectors and Member States. Previous studies mainly focussed on the individual impact of one Directive, but in this study we will assess the cumulative costs attributable to the environmental policy in its entirety and attempt to identify synergies between individual policies. The project has the following main objectives: paint a clearer picture of the environmental costs for the selected industries; indicate the differences in costs between individual companies; indicate the differences in costs between Member States; demonstrate the drivers for environmental expenditures of the companies and differences between sectors and Member States; describe different types of environmental regulation (policy instruments) and their impact on environmental expenditures; evaluate the environmental performance of the industries and differences between companies/Member States; collect evidence for the impacts of environmental regulation (and associated costs) on the competitiveness of companies; and carry out an international comparison. The sectors selected are:oil supply chain; electricity production; steel industry; and textile and leather industry

  4. 77 FR 42077 - Environmental Justice: Final Circular

    Science.gov (United States)

    2012-07-17

    ..., rulemaking, and policy formulation. The DOT Order sets forth steps to prevent disproportionately high and... Circular as a whole. Some commenters expressed concerns about perceived administrative and financial... Engagement With Environmental Justice Populations Chapter III contains recommended strategies and techniques...

  5. Resource Programs: Final Environmental Impact Statement

    International Nuclear Information System (INIS)

    1993-02-01

    Every two years, BA prepares a Resource Program, which identifies the resource actions BA will take to meet its obligation to serve the forecasted power requirements of its customers. The Resource Programs Environmental Impact Statement (RPEIS) is a programmatic environmental document that will support decisions made in several future Resource Programs. Environmental documents tiered to this EIS may be prepared on a site-specific basis. The RPEIS includes a description of the environmental effects and mitigation for the various resource types available in order to evaluate the trade-offs among them. It also assesses the environmental impacts of adding thirteen alternative combinations of resources to the existing power system. The alternatives represent the range of actions BA could take to meet its load obligations. Each of the alternatives allows BA to meet the almost 5,000 average megawatt load increase that could occur with high load growth, or an equivalent need for resources caused by a combination of load growth and any future loss of resources

  6. Klickitat Cogeneration Project : Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

  7. Klickitat Cogeneration Project: Final environmental assessment

    International Nuclear Information System (INIS)

    1994-09-01

    To meet BPA's contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA's proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact)

  8. Boise geothermal injection well: Final environmental assessment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    The City of Boise, Idaho, an Idaho Municipal Corporation, is proposing to construct a well with which to inject spent geothermal water from its hot water heating system back into the geothermal aquifer. Because of a cooperative agreement between the City and the US Department of Energy to design and construct the proposed well, compliance to the National Environmental Policy Act (NEPA) is required. Therefore, this Environmental Assessment (EA) represents the analysis of the proposed project required under NEPA. The intent of this EA is to: (1) briefly describe historical uses of the Boise Geothermal Aquifer; (2) discuss the underlying reason for the proposed action; (3) describe alternatives considered, including the No Action Alternative and the Preferred Alternative; and (4) present potential environmental impacts of the proposed action and the analysis of those impacts as they apply to the respective alternatives.

  9. Boise geothermal injection well: Final environmental assessment

    International Nuclear Information System (INIS)

    1997-01-01

    The City of Boise, Idaho, an Idaho Municipal Corporation, is proposing to construct a well with which to inject spent geothermal water from its hot water heating system back into the geothermal aquifer. Because of a cooperative agreement between the City and the US Department of Energy to design and construct the proposed well, compliance to the National Environmental Policy Act (NEPA) is required. Therefore, this Environmental Assessment (EA) represents the analysis of the proposed project required under NEPA. The intent of this EA is to: (1) briefly describe historical uses of the Boise Geothermal Aquifer; (2) discuss the underlying reason for the proposed action; (3) describe alternatives considered, including the No Action Alternative and the Preferred Alternative; and (4) present potential environmental impacts of the proposed action and the analysis of those impacts as they apply to the respective alternatives

  10. Fuel Receiving and Storage Station. Nuclear Regulatory Commission's final environmental statement

    International Nuclear Information System (INIS)

    1976-01-01

    The following items are covered: the site, the station, environmental effects of site preparation and station construction, environmental effects of station operation, effluent and environmental monitoring programs, environmental effects of accidents, need for BFRSS, benefit-cost analysis of alternatives, generic environmental impact statements, and discussion of and response to comments received on the draft environmental statement

  11. 78 FR 43912 - Final Candidate Conservation Agreement with Assurances, Final Environmental Assessment, and...

    Science.gov (United States)

    2013-07-22

    ...-FF02ENEH00] Final Candidate Conservation Agreement with Assurances, Final Environmental Assessment, and Finding of No Significant Impact; Rio Grande Cutthroat Trout, New Mexico and Colorado AGENCY: Fish and... environmental assessment (EA) and the draft Finding of No Significant Impact (FONSI) under the National...

  12. Environmental and Social Impact Study: Final Report

    International Nuclear Information System (INIS)

    2011-04-01

    The tsetse control project (commonly known as tsetse flies) is an initiative of the Directorate of Livestock (project coordinating institution) and the ISRA (Senegalese Agricultural Research Institute) Accompaniment and diagnosis of the project. It is part of the cooperation between Senegal and the International Atomic Energy Agency (IAEA).The method of control that will be applied is the technique of sterile males.This technique of sterile males, however, is coupled with the use of deltamethrin (D6), a neurotoxic chemical (in adult insects) that is fast and fairly rapidly biodegradable in the environment.This study is carried out with the aim of taking good account of the environmental impacts of the various activities envisaged by the project. Its objective is to assess the biophysical, social and economic impacts of the project and to propose measures to mitigate or compensate for negative impacts and to reinforce positive impacts within the framework of an Environmental Management Plan and (ESMP). It also presents an environmental and social monitoring and monitoring plan to assess the effectiveness of the proposed mitigation measures.

  13. Generic environmental statement on the routine use of plutonium-powered cardiac pacemakers

    International Nuclear Information System (INIS)

    Shoup, R.L.; Robinson, T.W.; O'Donnell, F.R.

    1976-01-01

    The purpose of a continuing program at ORNL is to provide technical assistance to the NRC on writing and editing of the final environmental statement on the routine use of nuclear-powered (primarily 238 Pu) cardiac pacemakers. This environmental statement defines the safety and reliability standards that nuclear-powered pacemakers are required to meet. All aspects of the risks to the patients, the public, and the environment are evaluated both for the routine use of plutonium-powered pacemakers and for postulated accidents involving pacemaker patients. Benefits derived from the use of plutonium-powered units are discussed and weighed against the risks in order to determine whether routine use is justified. Available alternative pacemakers with various performance characteristics are compared with respect to costs and to the needs of pacemaker patients

  14. Nuclear medicine environmental discharge measurement. Final report

    International Nuclear Information System (INIS)

    Gesell, T.F.; Prichard, H.M.; Davis, E.M.; Pirtle, O.L.; DiPietro, W.

    1975-06-01

    The discharge of most man-made radioactive materials to the environment is controlled by Federal, State or local regulatory agencies. Exceptions to this control include the radioactive wastes eliminated by individuals who have undergone diagnostic or therapeutic nuclear medicine procedures. The purpose of this study is to estimate the amount of radioactivity released to the environment via the nuclear medicine pathway for a single sewage drainage basin and to measure the amounts discharged to the environment. The report is organized into a review of previous studies, scope of work, facility data, environmental measurements and estimates of population exposure

  15. Bear Creek Project. Final environmental statement

    International Nuclear Information System (INIS)

    1977-06-01

    The Bear Creek Project consists of certain mining and milling operations involving uranium ore deposits located in Converse County, Wyoming. Mining of uranium from nine known ore bodies will take place over a period of ten years (estimated); a mill with a nominal capacity of 1000 tons per day of ore will be constructed and operated as long as ore is available. The waste material (tailings) from the mill, also produced at a rate of about 1000 tons per day, will be stored onsite in an impoundment. Environmental impacts and adverse effects are summarized

  16. Final rapid reactivation project environmental assessment

    International Nuclear Information System (INIS)

    1999-01-01

    The US Department of Energy (DOE) has prepared an environmental assessment (EA) for the Rapid Reactivation Project at Sandia National Laboratories, New Mexico. The EA analyzes the potential effects of a proposal to increase production of neutron generators from the current capability of 600 units per year up to 2,000 units per year. The project would use existing buildings and infrastructure to the maximum extent possible to meet the additional production needs. The increased production levels would necessitate modifications and additions involving a total area of approximately 26,290 gross square feet at Sandia National Laboratories, New Mexico, Technical Area 1. Additional production equipment would be procured and installed. The no-action alternative would be to continue production activities at the current capability of 600 units per year. The EA analyzes effects on health, safety, and air quality, resulting from construction and operation and associated cumulative effects. A detailed description of the proposed action and its environmental consequences is presented in the EA

  17. Final environmental impact statement. Marquez uranium mine

    International Nuclear Information System (INIS)

    1984-01-01

    As one of many activities TVA has undertaken to ensure an adequate supply of uranium for these plants, TVA has proposed to underground mine, through its operator, the uranium deposits located in the Canon de Marquez in McKinley County, New Mexico. Construction and operation of the underground mine would be expected to have the following environmental effects: (a) a temporary change in land use for 48.5 hectares from wildlife habitat and recreation to mineral extraction; (b) a minor alteration in topography near the proposed pond sites due to reclamation of waste rock piles; (c) minimal impacts on land due to limited vehicular traffic and road construction; (d) temporary depression of ground water levels in the Westwater Canyon Member of the Morrison Formation in the mine vicinity during mine life; (e) short-term project-induced impacts to surface water and shallow ground water quality; (f) a temporary decrease in air quality in the vicinity of the mining operations due to fugitive dust and exhaust emissions from combustion-driven mining and support vehicles and releases of radon and short-lived radon progeny from ventilation shafts and ore piles; (g) a temporary decrease of plant and animal species at the mine site; (h) a minor and temporary effect on aquatic systems downstream from the mine and settling ponds due to sedimentation; and (i) a minor increase of noise levels in the immediate vicinity of mine shafts and vents. The no action alternative and alternatives for securing uranium ore by other methods were considered but were found insufficient to meet TVA objectives. None of the alternatives explored were environmentally preferable. TVA also evaluated site specific alternatives including the following: different shaft and support building siting, mining techniques, and reclamation options. 25 figures, 20 tables

  18. Environmental wodking level monitor. Final report

    International Nuclear Information System (INIS)

    Keefe, D; McDowell, W.P.; Groer, P.G.

    1978-01-01

    The Environmental Working Level Monitor (EWLM) is an instrument used to automatically monitor airborne Rn-daughter concentrations and the Working Level (WL). It is an ac powered, microprocessor--based instrument with an external inverter provided for dc operation if desired. The microprocessor's control processor unit (CPU) controls the actuation of the detector assembly and processes its output signals to yield the measurements in the proper units. The detectors are fully automated and require no manual operations once the instrument is programmed. They detect and separate the alpha emitters of RaA and RaC' as well as detecting the beta emitters of RaB and RaC. The resultant pulses from these detected radioisotopes are transmitted to the CPU. The programmed microprocessor performs the mathematical manipulations necessary to output accurate Rn-daughter concentrations and the WL. A special subroutine within the system program enables the EWLM to run a calibration procedure on command which yields calibration data. This data can then be processed in a separate program on most computers capable of BASIC programming. This calibration program results in the derivation of coefficients and beta efficiencies which provides the calibrated coefficients and beta efficiencies required by the main system program to assure proper calibration of the individual EWLM's

  19. Wildlife mitigation program final environmental impact statement

    International Nuclear Information System (INIS)

    1997-03-01

    BPA is responsible for mitigating the loss of wildlife habitat caused by the development of the Federal Columbia River Power System. BPA accomplishes this mitigation by funding projects consistent with those recommended by the Northwest Power Planning Council (Council). The projects are submitted to the Council from Indian Tribes, state agencies, property owners, private conservation groups, and other Federal agencies. future wildlife mitigation actions with potential environmental impacts are expected to include land acquisition and management, water rights acquisition and management, habitat restoration and improvement, installation of watering devices, riparian fencing, and similar wildlife conservation actions. BPA needs to ensure that individual wildlife mitigation projects are planned and managed with appropriate consistency across projects, jurisdictions, and ecosystems, as well as across time. BPA proposes to standardize the planning and implementation of individual wildlife mitigation projects funded by BPA. Alternative 1 is the No Action alternative, i.e., not to establish program-wide standards. Five standardizing (action) alternatives are identified to represent the range of possible strategies, goals, and procedural requirements reasonably applicable to BPA-funded projects under a standardized approach to project planning and implementation. All action alternatives are based on a single project planning process designed to resolve site-specific issues in an ecosystem context and to adapt to changing conditions and information

  20. Griffith energy project final environmental impact statement

    International Nuclear Information System (INIS)

    1999-03-01

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fired, combined cycle power plant, on private lands south of Kingman, Arizona. The Project would be a merchant plant which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information

  1. Griffith Energy Project Final Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-04-02

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.

  2. Final environmental statement for the geothermal leasing program

    Energy Technology Data Exchange (ETDEWEB)

    1973-12-31

    This second of the four volumes of the Geothermal Leasing Program final impact statement contains the individual environmental statements for the leasing of federally owned geothermal resources for development in three specific areas: Clear Lake-Geysers; Mono Lake-Long Valley; and Imperial Valley, all in California. It also includes a summary of the written comments received and departmental responses relative to the Draft Environmental Impact Statement issued in 1971; comments and responses on the Draft Environmental Impact Statement; consultation and coordination in the development of the proposal and in the preparation of the Draft Environmental Statement; and coordination in the review of the Draft Environmental Statement.

  3. 77 FR 18879 - Department of Transportation Final Environmental Justice Strategy

    Science.gov (United States)

    2012-03-28

    ... Transportation Final Environmental Justice Strategy AGENCY: Office of the Secretary of Transportation, DOT... strategy, which sets forth DOT's commitment to identifying and addressing disproportionately high and...-income populations. This strategy is published as a final document; however, it is a revision of a...

  4. Shellsim: A Generic Model of Growth and Environmental Effects Validated Across Contrasting Habitats in Bivalve Shellfish

    NARCIS (Netherlands)

    Hawkins, A.; Pascoe, P.L.; Parry, H.; Brinsley, M.; Black, K.; McGonigle, C.; Smaal, A.C.

    2013-01-01

    Previous shellfish models have, in general, been calibrated for 1 location, unable to simulate growth across habitats that contrast in seston abundance and composition, as may vary between turbid, eutrophic and oligotrophic waters. Here, we describe the generic shellfish model ShellSIM,

  5. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 1, Environmental Analysis.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This is volume 1 of the final environmental impact statement of the Bonneville Power Administration Information is included on the following: Purpose of and need for action; alternatives including the proposed action; affected environment; and environmental consequences.

  6. Northeastern Regional Environmental Characterization Report. Executive summary. Final report

    International Nuclear Information System (INIS)

    1985-08-01

    This Executive Summary of the final Northeastern Regional Environmental Characterization Report (RECR) is issued primarily for public information purposes and provides a general overview of the report. The complete RECR presents available regional environmental information pertinent to siting a repository for high-level nuclear waste in crystalline rock in Connecticut, Maine, Massachusetts, New Hampshire, New Jersey, New York, Pennsylvania, Rhode Island, and Vermont. For each of the states within the Northeastern Region, information is provided on the environmental disqualifying factors and the environmental regional screening variables to be used in region-to-area screening

  7. North Central regional environmental characterization report: executive summary - final

    International Nuclear Information System (INIS)

    1985-08-01

    This Executive Summary of the final North Central Regional Environmental Characterization Report (RECR) is issued primarily for public information purposes and provides a general overview of the report. The complete RECR presents available regional environmental information pertinent to siting a repository for high-level nuclear waste in crystalline rock in Minnesota, Wisconsin, and the Upper Peninsula of Michigan. For each of the States within the North Central Region, information is provided on the environmental disqualifying factors and the environmental regional screening variables to be used in region-to-area screening

  8. Southeastern Regional Environmental Characterization Report: executive summary. Final report

    International Nuclear Information System (INIS)

    1985-08-01

    This Executive Summary of the final ''Southeastern Regional Environmental Characterization Report'' (RECR) is issued primarily for public information purposes and provides a general overview of the report. The complete RECR presents available regional environmental information pertinent to siting a repository or high-level nuclear waste in crystalline rock in central Maryland; noncoastal Virginia, North Carolina, and South Carolina; and northern Georgia. For each of the states within the Southeastern Region, information is provided on the environmental disqualifying factors and the environmental regional screening variables to be used in region-to-area screening

  9. Development of a Generic Environmental Safety Case for the Disposal of Higher Activity Wastes in the UK

    International Nuclear Information System (INIS)

    Bailey, Lucy; Hicks, Tim

    2016-01-01

    The UK generic ESC demonstrates safe disposal of higher activity wastes, by providing: • A demonstration of how environmental safety can be achieved by a variety of disposal concepts based on systems of multiple engineered and natural barriers, providing multiple safety functions; • An understanding of expected barrier performance and how conditions in a disposal system will evolve, based on research findings presented in RWM’s knowledge base; • An approach to safety assessment based on multiple lines of reasoning, involving both qualitative and quantitative analysis; • Complementary insight modelling and total system modelling used to develop understanding of how different components of the engineered and natural barrier system contribute to safety

  10. Quantification of environmental impacts of various energy technologies. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Selfors, A [ed.

    1994-10-01

    This report discusses problems related to economic assessment of the environmental impacts and abatement measures in connection with energy projects. Attention is called to the necessity of assessing environmental impacts both in the form of reduced economic welfare and in the form of costs of abatement measures to reduce the impact. In recent years, several methods for valuing environmental impacts have been developed, but the project shows that few empirical studies have been carried out. The final report indicates that some important factors are very difficult to evaluate. In addition environmental impacts of energy development in Norway vary considerably from project to project. This makes it difficult to obtain a good basis for comparing environmental impacts caused by different technologies, for instance hydroelectric power versus gas power or wind versus hydroelectric power. It might be feasible however to carry out more detailed economic assessments of environmental impacts of specific projects. 33 refs., 1 fig., 4 tabs.

  11. 75 FR 26272 - Final Environmental Impact Statement; Environmental Education Center, Yosemite National Park...

    Science.gov (United States)

    2010-05-11

    ... DEPARTMENT OF THE INTERIOR National Park Service Final Environmental Impact Statement; Environmental Education Center, Yosemite National Park, Mariposa County, CA; Notice of Approval of Record of Decision SUMMARY: Pursuant to Sec. 102(2)(C) of the National Environmental Policy Act of 1969 (Pub. L. 91...

  12. Waste Isolation Pilot Plant: Final supplement environmental impact statement

    International Nuclear Information System (INIS)

    1990-01-01

    The purpose of this Supplement Environmental Impact Statement (SEIS) is to update the environmental record established in 1980 by evaluating the environmental impacts associated with new information, new circumstances, and proposal modifications. This SEIS evaluates and compares the Proposed Action and two alternatives. This final SEIS for the WIPP project is a revision of the draft SEIS published in April 1989. It includes responses to the public comments received in writing and at the public hearings and revisions of the draft SEIS in response to the public comments. Revisions of importance have been identified in this final SEIS by vertical lines in the margins to highlight changes made in response to comments. Volumes 1 through 3 of the final SEIS contain the text, appendices, and the summary comments and responses, respectively. Volumes 6 through 13 of the final SEIS contain reproductions of all of the comments received on the draft SEIS, and Volumes 4 and 5 contain the indices to Volumes 6 through 13. An Executive Summary and/or Volumes 1 through 5 of the final SEIS have been distributed to those who received the draft SEIS or requested a copy of the final SEIS. Volume 5 contains indices to public comments

  13. 75 FR 62133 - Notice of Availability of Final Environmental Assessment (FINAL EA) and a Finding of No...

    Science.gov (United States)

    2010-10-07

    ... Availability of Final Environmental Assessment (FINAL EA) and a Finding of No Significant Impact (FONSI) for... of No Significant Impact (FONSI) for Land Purchase, Access Road Construction and Access Tunnel... Impact (FONSI) based on the Final Environmental Assessment (FINAL EA) for Land Purchase, Access Road...

  14. 10 CFR 51.91 - Final environmental impact statement-contents.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Final environmental impact statement-contents. 51.91... Implementing Section 102(2) Final Environmental Impact Statements-General Requirements § 51.91 Final environmental impact statement—contents. (a)(1) The final environmental impact statement will include responses...

  15. 10 CFR 51.94 - Requirement to consider final environmental impact statement.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Requirement to consider final environmental impact...-Regulations Implementing Section 102(2) Final Environmental Impact Statements-General Requirements § 51.94 Requirement to consider final environmental impact statement. The final environmental impact statement...

  16. 2004 Power marketing program final EIS - final environmental impact statement. Volume 2 - appendices

    International Nuclear Information System (INIS)

    1997-02-01

    This volume contains appendices to the Final Environmental Impact Statement (FEIS) for the Power Marketing Program proposal of the Western Area Power Administration. The FEIS identified peaking power scheduling as the environmentally preferred alternative, and presented the analysis of alternatives and environmental impacts. Sixteen appendices to the FEIS are included in this document. The appendices are: Statutory and Legal Framework; Sierra Nevada Region Customer Groups and Economic Regions; Renewable Technology Cost Information Matrix; Hydrological Assumptions; Recreation Resources; Archaeological and Historical Resources; Incremental Power Resources; Air Quality Regulatory Structure; Energy Generation; Stage Contents Relationships for Regulating Reservoirs; Power Costs; Socioeconomic Impacts; Projected Air Resource Impacts; Land use, Water Quality, and Solid Waste Impact Factors; Draft Environmental Impact Statement Comments and Responses, and Contractor Disclosure Statements. 21 figs., 24 tabs

  17. Columbia River system operation review. Final environmental impact statement

    International Nuclear Information System (INIS)

    1995-11-01

    This Appendix C of the Final Environmental Impact Statement for the Columbia River System discusses impacts on andromous fish and juvenile fish transportation. The principal andromous fish in the Columbia basin include salmonid species (Chinook, coho, and sockeye salmon, and steelhead) and nonsalmoinid andromous species (sturgeon, lamprey, and shad). Major sections in this document include the following: background, scope and process; affected environment for salmon and steelhead, shaded, lamprey, sturgeon; study methods; description of alternatives: qualitative and quantitative findings

  18. Final Environmental Assessment for the Military Family Housing Privatization Initiative

    Science.gov (United States)

    2006-09-01

    Year 2005 through 2009: VOCE = .016 * Trips NOxE = .015 * Trips PM10E = .0022 * Trips COE = .262 * Trips Appendix A Additional Materials Final...Environmental Assessment Page A-39 Military Family Housing Privatization Initiative Robins Air Force Base, Georgia Year 2010 and beyond: VOCE ...yr) = VOCE * DPYII/2000 NOx (tons/yr) = NOxE * DPYII/2000 PM10 (tons/yr) = PM10E * DPYII/2000 CO (tons/yr) = COE * DPYII/2000 Where: Area of

  19. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final

    Energy Technology Data Exchange (ETDEWEB)

    None

    1999-02-01

    This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been prepared to meet the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The Proposed Action includes the construction, operation, and decommissioning of a 48 megawatt (gross) geothermal power plant with ancillary facilities (10-12 production well pads and 3-5 injection well pads, production and injection pipelines), access roads, and a 230-kilovolt (kV) transmission line in the Modoc National Forest in Siskiyou County, California. Alternative locations for the power plant site within a reasonable distance of the middle of the wellfield were determined to be technically feasible. Three power plant site alternatives are evaluated in the Final EIS/EIR.

  20. Public comments on the draft generic environmental impact statement for management of commercially generated radioactive waste

    International Nuclear Information System (INIS)

    Kreiter, M.R.; Unruh, C.M.; McCallum, R.F.

    1980-01-01

    The US Department of Energy has the responsibility for developing the technology required for managing commercial radioactive wastes in an environmentally acceptable manner. As part of this responsibility, DOE has prepared a draft environmental impact statement on the management of commercially generated radioactive waste. The draft was issued for public comment in April of 1979; five public hearings were held. The draft GEIS is intended to provide environmental input for the selection of an appropriate program strategy for the permanent isolation of commercially generated high-level and transuranic wastes. The scope of such a strategy includes research and development into alternative treatment processes and emplacement media, site investigations into candidate media, and the examination of advanced waste management technologies. The draft statement describes the commercial radioactive wastes that would have to be managed for very long periods of time from an assumed nuclear generation scenario of 10,000 GWe-yr of power over a 65-year period ending in 2040

  1. Modified enforcement policy relating to 10 CFR 50.49, ''Environmental qualification of electrical equipment important to safety for nuclear power plants'' (Generic Letter 88-07)

    International Nuclear Information System (INIS)

    Miraglia, F.J.

    1992-01-01

    Generic Letters, Bulletins, and Information Notices have been issued to provide guidance regarding the application and enforcement of 10 CFR 50.49, ''Environmental Qualification of Electric Equipment Important to Safety for Nuclear Power Plants.'' Generic Letter 85-15, issued August 6, 1985, and Generic Letter 86-15, issued September 22, 1986, provided information related to the deadlines for compliance with 10 CFR 50.49 and possible civil penalties applicable to licensees who were not in compliance with the rule as of the November 30, 1985 deadline. Upon review, the Commission found that the EQ Enforcement Policy promulgated in Generic Letter 86-15, could result in imposition of civil penalties that did not properly reflect the safety significance of EQ violations with respect to civil penalties imposed in the past. In the interest of continuing a tough but fair enforcement policy, the Commission determined that the EQ Enforcement Policy should be revised. The purpose of this letter is to provide a modification to the NRC's enforcement policy, as approved by the Commission, for environmental qualification (EQ) violations. This letter replaces the guidance provided in Generic Letters 85-15 and 86-15

  2. Generic data sources for the update of an environmental report in support of license renewal

    International Nuclear Information System (INIS)

    Mauro, John J.

    1991-01-01

    Over the past 2 years, our organization has been providing assistance to the NUMARC PLEX working group in matters pertaining to the environmental impacts of license renewal. Part of this support was the identification of data sets and publications that may be useful to the NRC in the preparation of their Environment Report Supplements (ERSs). The following presents a strategy for preparing an ERS, along with references and data sets pertinent to each ER topic. Each section of the ERS should present the following information: (1) Updated information on plant design and operating experience, along with projections of the plant impacts through the end of its currently licensed period of operation. These impacts are used as a baseline against which to compare the projected impacts for the period of license renewal. In addition, the baseline impacts may be compared to the impacts projected in the plant's original Environmental Report and Environmental Impact Statement. (2) Projections of how the impacts may change during the period of license renewal. The purpose of this information will be to determine the degree to which the projected impacts differ significantly from the impacts presented in the original ER and those that have actually occurred during the period of plant operation. We believe that the ERS will reveal that (1) the actual impacts that have occurred during the period of plant operation are comparable to, or less than, those predicted in the original ER, (2) many impacts have been decreasing with time, such as routine radioactive emissions, and (3) the impacts predicted for the period of license renewal will be comparable to, or less than, the baseline impacts. (author)

  3. 10 CFR 51.118 - Final environmental impact statement-notice of availability.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Final environmental impact statement-notice of... environmental impact statement—notice of availability. (a) Upon completion of a final environmental impact statement or any supplement to a final environmental impact statement, the appropriate NRC staff director...

  4. Final environmental impact statement. Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1980-10-01

    This volume contains the appendices for the Final Environmental Impact Statement for the Waste Isolation Pilot Plant (WIPP). Alternative geologic environs are considered. Salt, crystalline rock, argillaceous rock, and tuff are discussed. Studies on alternate geologic regions for the siting of WIPP are reviewed. President Carter's message to Congress on the management of radioactive wastes and the findings and recommendations of the interagency review group on nuclear waste management are included. Selection criteria for the WIPP site including geologic, hydrologic, tectonic, physicochemical compatability, and socio-economic factors are presented. A description of the waste types and the waste processing procedures are given. Methods used to calculate radiation doses from radionuclide releases during operation are presented. A complete description of the Los Medanos site, including archaeological and historic aspects is included. Environmental monitoring programs and long-term safety analysis program are described

  5. Final environmental impact statement. Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    1980-10-01

    This volume contains the appendices for the Final Environmental Impact Statement for the Waste Isolation Pilot Plant (WIPP). Alternative geologic environs are considered. Salt, crystalline rock, argillaceous rock, and tuff are discussed. Studies on alternate geologic regions for the siting of WIPP are reviewed. President Carter's message to Congress on the management of radioactive wastes and the findings and recommendations of the interagency review group on nuclear waste management are included. Selection criteria for the WIPP site including geologic, hydrologic, tectonic, physicochemical compatability, and socio-economic factors are presented. A description of the waste types and the waste processing procedures are given. Methods used to calculate radiation doses from radionuclide releases during operation are presented. A complete description of the Los Medanos site, including archaeological and historic aspects is included. Environmental monitoring programs and long-term safety analysis program are described. (DMC)

  6. Superconducting Super Collider: Final environmental impact statement: Volume 1

    International Nuclear Information System (INIS)

    1988-12-01

    This Environmental Impact Statement (EIS) provides as much information as possible at this stage of the project development regarding the potential environmental impacts of the proposed construction and operation of a Superconducting Super Collider (SSC) at each of the site alternatives. However, the DOE recognizes that further review under the National Environmental Policy Act (NEPA) is required prior to construction and operation of the proposed SSC project at the selected site based on more detailed design and to identify specific mitigation measures which can be incorporated into final design. Accordingly, following selection of a site for the proposed SSC, the DOE will prepare a Supplemental EIS to address in more detail the impacts of constructing and operating the proposed SSC at the selected site and alternatives for mitigating those impacts. To measure the effects of constructing the SSC at any of the seven alternative sites, the DOE determined which aspects of the human environment would be significantly affected. The EIS describes the baseline conditions at each of the seven site alternatives, the trends underway resulting in changes, the potential environmental impacts expected if the SSC were sited, possible mitigations of adverse impacts, and resulting residual adverse impacts

  7. Design, implementation and verification of software code for radiation dose assessment based on simple generic environmental model

    International Nuclear Information System (INIS)

    I Putu Susila; Arif Yuniarto

    2017-01-01

    Radiation dose assessment to determine the potential of radiological impacts of various installations within nuclear facility complex is necessary to ensure environmental and public safety. A simple generic model-based method for calculating radiation doses caused by the release of radioactive substances into the environment has been published by the International Atomic Energy Agency (IAEA) as the Safety Report Series No. 19 (SRS-19). In order to assist the application of the assessment method and a basis for the development of more complex assessment methods, an open-source based software code has been designed and implemented. The software comes with maps and is very easy to be used because assessment scenarios can be done through diagrams. Software verification was performed by comparing its result to SRS-19 and CROM software calculation results. Dose estimated by SRS-19 are higher compared to the result of developed software. However, these are still acceptable since dose estimation in SRS-19 is based on conservative approach. On the other hand, compared to CROM software, the same results for three scenarios and a non-significant difference of 2.25 % in another scenario were obtained. These results indicate the correctness of our implementation and implies that the developed software is ready for use in real scenario. In the future, the addition of various features and development of new model need to be done to improve the capability of software that has been developed. (author)

  8. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments

    Energy Technology Data Exchange (ETDEWEB)

    None

    1999-02-01

    This document is the Comments and Responses to Comments volume of the Final Environmental Impact Statement and Environmental Impact Report prepared for the proposed Telephone Flat Geothermal Development Project (Final EIS/EIR). This volume of the Final EIS/EIR provides copies of the written comments received on the Draft EIS/EIR and the leady agency responses to those comments in conformance with the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).

  9. 77 FR 44267 - Notice of Availability of the Final Programmatic Environmental Impact Statement for Solar Energy...

    Science.gov (United States)

    2012-07-27

    ...] Notice of Availability of the Final Programmatic Environmental Impact Statement for Solar Energy... Environmental Impact Statement for Solar Energy Development in Six Southwestern States (Final Programmatic EIS... RMP Amendments, references, and additional information regarding solar energy development are...

  10. Generic Advantages

    Indian Academy of Sciences (India)

    First page Back Continue Last page Overview Graphics. Generic Advantages. Scalability an incremental coverage. Standardization. Business Plan Flexibility. Lifecycle Flexibility. Reliability. Service Interoperability. Changed Industry dynamics.

  11. 10 CFR 51.92 - Supplement to the final environmental impact statement.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Supplement to the final environmental impact statement. 51...-Regulations Implementing Section 102(2) Final Environmental Impact Statements-General Requirements § 51.92 Supplement to the final environmental impact statement. (a) If the proposed action has not been taken, the...

  12. 10 CFR 51.90 - Final environmental impact statement-general.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Final environmental impact statement-general. 51.90... Implementing Section 102(2) Final Environmental Impact Statements-General Requirements § 51.90 Final environmental impact statement—general. After receipt and consideration of comments requested pursuant to §§ 51...

  13. 10 CFR 51.97 - Final environmental impact statement-materials license.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Final environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Final Environmental Impact Statements-Materials Licenses § 51.97 Final environmental impact statement—materials license. (a) Independent spent fuel storage installation (ISFSI...

  14. Georgetown University generic integrated community energy system GU-ICES demonstration project. Modified work management plan. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-04-01

    This Phase II Modified Work Management Plan reflects the change from a Coal Using ICES to a Generic ICES Program. As such, it retains the essential elements relating to coal while broadening the number and types of alternative energy subsystems to be evaluated for eventual implementation on the Georgetown University Campus. In addition to the plan in Book I, Book II deals with an energy audit conducted at the campus in the fall of 1978 to establish a gross baseline from which to measure and evaluate the contributions of selected alternative energy subsystems both from an energy and cost standpoint. Book I proceeds from a discussion of an ICES through an explanation of the scope of effort in each phase expanded into detailed task descriptions by phase together with schedules, PERT and GANTT charts, milestones and levels of effort by task for the Feasibility Analysis, and schedules for the overall program. A description of examples of alternative subsystems to be considered is also included. A detailed Management Plan for the conduct of the effort by General Electric completes the plan. Appendices related to cogeneration, life-cycle costing, GE energy subsystems, the GU Master Energy Plan, and typical regulatory processes to be encountered are included. Book II treats the Energy Audit under the three committed task areas of System Description, Analysis and Survey, and Criteria for Energy Usage. The five major energy systems utilized at Georgetown are considered: electrical, chilled water, steam, gas and fuel oil, and city water. A top level analysis yields significant results and recommendations for further action with respect to a detailed measurements program, particularly of steam and electric power usage, over a one year period.

  15. Blue Creek Winter Range: Wildlife Mitigation Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1994-11-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Agreement pertaining to the Blue Creek Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Spokane Tribe, Upper Columbia United Tribes, and the Bureau of Indian Affairs (BIA). If fully implemented, the proposed action would allow the sponsors to protect and enhance 2,631 habitat units of big game winter range and riparian shrub habitat on 2,185 hectares (5,400 acres) of Spokane Tribal trust lands, and to conduct long term wildlife management activities within the Spokane Indian Reservation project area. This Final Environmental Assessment (EA) examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir

  16. Hellsgate Winter Range : Wildlife Mitigation Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  17. Hellsgate Winter Range: Wildlife mitigation project. Final environmental assessment

    International Nuclear Information System (INIS)

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs

  18. 76 FR 12342 - Notice of Availability of Record of Decision for the Final Environmental Impact Statement...

    Science.gov (United States)

    2011-03-07

    ... Final Environmental Impact Statement/Overseas Environmental Impact Statement for Gulf of Mexico Range... set forth in Alternative 2, described in the Final Environmental Impact Statement (EIS)/Overseas Environmental Impact Statement (OEIS) as the Preferred Alternative. The purpose for the proposed action is to...

  19. 2006 Long Range Development Plan Final Environmental ImpactReport

    Energy Technology Data Exchange (ETDEWEB)

    Philliber, Jeff

    2007-01-22

    This environmental impact report (EIR) has been prepared pursuant to the applicable provisions of the California Environmental Quality Act (CEQA) and its implementing guidelines (CEQA Guidelines), and the Amended University of California Procedures for Implementation of the California Environmental Quality Act (UC CEQA Procedures). The University of California (UC or the University) is the lead agency for this EIR, which examines the overall effects of implementation of the proposed 2006 Long Range Development Plan (LRDP; also referred to herein as the 'project' for purposes of CEQA) for Lawrence Berkeley National Laboratory (LBNL; also referred to as 'Berkeley Lab,' 'the Laboratory,' or 'the Lab' in this document). An LRDP is a land use plan that guides overall development of a site. The Lab serves as a special research campus operated by the University employees, but it is owned and financed by the federal government and as such it is distinct from the UC-owned Berkeley Campus. As a campus operated by the University of California, the Laboratory is required to prepare an EIR for an LRDP when one is prepared or updated pursuant to Public Resources Code Section 21080.09. The adoption of an LRDP does not constitute a commitment to, or final decision to implement, any specific project, construction schedule, or funding priority. Rather, the proposed 2006 LRDP describes an entire development program of approximately 980,000 gross square feet of new research and support space construction and 320,000 gross square feet of demolition of existing facilities, for a total of approximately 660,000 gross square feet of net new occupiable space for the site through 2025. Specific projects will undergo CEQA review at the time proposed to determine what, if any, additional review is necessary prior to approval. As described in Section 1.4.2, below, and in Chapter 3 of this EIR (the Project Description), the size of the project has been

  20. LANL environmental restoration site ranking system: System description. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Merkhofer, L.; Kann, A.; Voth, M. [Applied Decision Analysis, Inc., Menlo Park, CA (United States)

    1992-10-13

    The basic structure of the LANL Environmental Restoration (ER) Site Ranking System and its use are described in this document. A related document, Instructions for Generating Inputs for the LANL ER Site Ranking System, contains detailed descriptions of the methods by which necessary inputs for the system will be generated. LANL has long recognized the need to provide a consistent basis for comparing the risks and other adverse consequences associated with the various waste problems at the Lab. The LANL ER Site Ranking System is being developed to help address this need. The specific purpose of the system is to help improve, defend, and explain prioritization decisions at the Potential Release Site (PRS) and Operable Unit (OU) level. The precise relationship of the Site Ranking System to the planning and overall budget processes is yet to be determined, as the system is still evolving. Generally speaking, the Site Ranking System will be used as a decision aid. That is, the system will be used to aid in the planning and budgetary decision-making process. It will never be used alone to make decisions. Like all models, the system can provide only a partial and approximate accounting of the factors important to budget and planning decisions. Decision makers at LANL will have to consider factors outside of the formal system when making final choices. Some of these other factors are regulatory requirements, DOE policy, and public concern. The main value of the site ranking system, therefore, is not the precise numbers it generates, but rather the general insights it provides.

  1. LANL environmental restoration site ranking system: System description. Final report

    International Nuclear Information System (INIS)

    Merkhofer, L.; Kann, A.; Voth, M.

    1992-01-01

    The basic structure of the LANL Environmental Restoration (ER) Site Ranking System and its use are described in this document. A related document, Instructions for Generating Inputs for the LANL ER Site Ranking System, contains detailed descriptions of the methods by which necessary inputs for the system will be generated. LANL has long recognized the need to provide a consistent basis for comparing the risks and other adverse consequences associated with the various waste problems at the Lab. The LANL ER Site Ranking System is being developed to help address this need. The specific purpose of the system is to help improve, defend, and explain prioritization decisions at the Potential Release Site (PRS) and Operable Unit (OU) level. The precise relationship of the Site Ranking System to the planning and overall budget processes is yet to be determined, as the system is still evolving. Generally speaking, the Site Ranking System will be used as a decision aid. That is, the system will be used to aid in the planning and budgetary decision-making process. It will never be used alone to make decisions. Like all models, the system can provide only a partial and approximate accounting of the factors important to budget and planning decisions. Decision makers at LANL will have to consider factors outside of the formal system when making final choices. Some of these other factors are regulatory requirements, DOE policy, and public concern. The main value of the site ranking system, therefore, is not the precise numbers it generates, but rather the general insights it provides

  2. 78 FR 10606 - Final Management Plan and Environmental Assessment for Monitor National Marine Sanctuary: Notice...

    Science.gov (United States)

    2013-02-14

    ... Environmental Assessment for Monitor National Marine Sanctuary: Notice of Public Availability AGENCY: Office of National Marine Sanctuaries (ONMS), National Ocean Service (NOS), National Oceanic and Atmospheric... releasing the final management plan and environmental assessment for Monitor National Marine Sanctuary. DATE...

  3. 76 FR 6455 - Final Programmatic Environmental Impact Statement (PEIS) for the Growth, Realignment, and...

    Science.gov (United States)

    2011-02-04

    ... alternative, the Army would retain its aviation force structure at its current levels, configurations, and.... The primary environmental issues evaluated include impacts to air quality, soil, airspace, cultural... DEPARTMENT OF DEFENSE Department of the Army Final Programmatic Environmental Impact Statement...

  4. 76 FR 80924 - Boott Hydropower, Inc.; Notice of Availability of Final Environmental Assessment

    Science.gov (United States)

    2011-12-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2790-055] Boott Hydropower, Inc.; Notice of Availability of Final Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and [[Page 80925

  5. Twenty-fifth water reactor safety information meeting: Proceedings. Volume 1: Plenary sessions; Pressure vessel research; BWR strainer blockage and other generic safety issues; Environmentally assisted degradation of LWR components; Update on severe accident code improvements and applications

    International Nuclear Information System (INIS)

    Monteleone, S.

    1998-03-01

    This three-volume report contains papers presented at the conference. The papers are printed in the order of their presentation in each session and describe progress and results of programs in nuclear safety research conducted in this country and abroad. Foreign participation in the meeting included papers presented by researchers from France, Japan, Norway, and Russia. The titles of the papers and the names of the authors have been updated and may differ from those that appeared in the final program of the meeting. This volume contains the following information: (1) plenary sessions; (2) pressure vessel research; (3) BWR strainer blockage and other generic safety issues; (4) environmentally assisted degradation of LWR components; and (5) update on severe accident code improvements and applications. Selected papers have been indexed separately for inclusion in the Energy Science and Technology Database

  6. Twenty-fifth water reactor safety information meeting: Proceedings. Volume 1: Plenary sessions; Pressure vessel research; BWR strainer blockage and other generic safety issues; Environmentally assisted degradation of LWR components; Update on severe accident code improvements and applications

    Energy Technology Data Exchange (ETDEWEB)

    Monteleone, S. [comp.] [Brookhaven National Lab., Upton, NY (United States)

    1998-03-01

    This three-volume report contains papers presented at the conference. The papers are printed in the order of their presentation in each session and describe progress and results of programs in nuclear safety research conducted in this country and abroad. Foreign participation in the meeting included papers presented by researchers from France, Japan, Norway, and Russia. The titles of the papers and the names of the authors have been updated and may differ from those that appeared in the final program of the meeting. This volume contains the following information: (1) plenary sessions; (2) pressure vessel research; (3) BWR strainer blockage and other generic safety issues; (4) environmentally assisted degradation of LWR components; and (5) update on severe accident code improvements and applications. Selected papers have been indexed separately for inclusion in the Energy Science and Technology Database.

  7. Brookhaven National Laboratory, Upton, New York final environmental impact statement

    International Nuclear Information System (INIS)

    Liverman, J.L.

    1977-07-01

    Generally, data used for the statement were those which had been accumulated through the calendar year 1973. Since 1973, Environmental Monitoring Reports have been published for calendar years 1974 and 1975. A review of these more recent documents reveals that the data contained therein lead to no significant change in the conclusions drawn in this Environmental Impact Statement. Past Laboratory operations were considered only insofar as they contribute to continuing environmental impacts. Environmental effects were considered solely with respect to off-site consequences, the only exception being those cases where on-site effects have had or will have an impact on the long-term productivity of the Laboratory site

  8. Generic component reliability data for research reactors PSA. Final report of the CRP on data acquisition for research reactor PSA. Working material

    International Nuclear Information System (INIS)

    1993-01-01

    The scope of this document is to provide the final reference generic component reliability database information for a variety of research reactor types. As noted in Section 2.1 and Table 3a, many years of component data are represented in the database so that it is expected that the report should provide representative data valid for a number of years. The database provides component failure rates on a time and/or a demand related basis according to the operational modes of the components. At the current time an update of the database is not planned. As a result of the implementation of data collection systems in the research reactors represented in these studies, updating of data from individual facilities could be made available from the contributing research reactor facilities themselves. As noted in Section 1.2, the report does not include detailed discussion of information regarding component classification and reliability parameter definitions. The report does provide some insights and discussion regarding the practicalities of the data collection process and some guidelines for database usage. 9 refs, tabs

  9. Generic component reliability data for research reactors PSA. Final report of the CRP on data acquisition for research reactor PSA. Working material

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    The scope of this document is to provide the final reference generic component reliability database information for a variety of research reactor types. As noted in Section 2.1 and Table 3a, many years of component data are represented in the database so that it is expected that the report should provide representative data valid for a number of years. The database provides component failure rates on a time and/or a demand related basis according to the operational modes of the components. At the current time an update of the database is not planned. As a result of the implementation of data collection systems in the research reactors represented in these studies, updating of data from individual facilities could be made available from the contributing research reactor facilities themselves. As noted in Section 1.2, the report does not include detailed discussion of information regarding component classification and reliability parameter definitions. The report does provide some insights and discussion regarding the practicalities of the data collection process and some guidelines for database usage. 9 refs, tabs.

  10. Portsmouth Gaseous Diffusion Plant expansion: final environmental statement. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    1977-09-01

    Volume 1 is comprised of chapters on: background and description; environmental impacts of add-on gaseous diffusion plant; unavoidable adverse environmental effects; alternatives; relationship between short-term uses and long-term productivity; relationship of program to land-use plans, policies, and controls; irreversible and irretrievable commitments of resources; cost-benefit analysis; and response to comment letters. (LK)

  11. Portsmouth Gaseous Diffusion Plant expansion: final environmental statement. Volume 1

    International Nuclear Information System (INIS)

    1977-09-01

    Volume 1 is comprised of chapters on: background and description; environmental impacts of add-on gaseous diffusion plant; unavoidable adverse environmental effects; alternatives; relationship between short-term uses and long-term productivity; relationship of program to land-use plans, policies, and controls; irreversible and irretrievable commitments of resources; cost-benefit analysis; and response to comment letters

  12. Family Genericity

    DEFF Research Database (Denmark)

    Ernst, Erik

    2006-01-01

    Type abstraction in object-oriented languages embody two techniques, each with its own strenghts and weaknesses. The first technique is extension, yielding abstraction mechanisms with good support for gradual specification. The prime example is inheritance. The second technique is functional abst...... the result as family genericity. The presented language design has been implemented....

  13. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  14. Wing Infrastructure and Development Outlook (WINDO) Final Environmental Assessment

    Science.gov (United States)

    2006-06-01

    combustion) 2/27/95a 8/97 Pulp & Paper (non- comb .) 10/29/95a 5/97 Secondary Aluminum Prod. 4/97 11/97 Steel Pickling-HC1 Process 2/97 12/97 Wool ...DOE Department of Energy EA Environmental Assessment ECR Electronic Combat Range EIAP Environmental Impact Analysis Process EIS Environmental...of 2005 to 2006), Nellis AFB would ensure that these goals are not only achieved, but also maximized. The WINDO environment impact analysis process

  15. Ground Combat Training Squadron Complex Final Environmental Assessment

    Science.gov (United States)

    2011-08-01

    Squadron E nvironm ental A ssessm ent Page 1-6 Eglin A ir Force Base, FL Final Figure 1-2. R esources N ot C arried Forw ard for D etailed A...Base, FL Final Figure 3-1. W ater R esources w ithin or near the Proposed A ction or A lternative L ocations Legend c::J Project Sites 1 00...bat T raining Squadron E nvironm ental A ssessm ent Page 3-14 Eglin A ir Force Base, FL Final Figure 3-3. B iological R esources w ithin or

  16. Environmental-performance research priorities: Wood products. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-15

    This report describes a research plan to establish environmental, energy, and economic performance measures for renewable building materials, and to identify management and technology alternatives to improve environmental performance in a cost-effective manner. The research plan is designed to: (1) collect environmental and economic data on all life-cycle stages of the materials, (2) ensure that the data follows consistent definitions and collection procedures, and (3) develop analytical procedures for life-cycle analysis to address environmental performance questions. The research will be subdivided into a number of individual project modules. The five processing stages of wood used to organize the research plan are: (1) resource management and harvesting; (2) processing; (3) design and construction of structures; (4) use, maintenance, and disposal; and (5) waste recycling. Individual research module descriptions are provided in the report, as well as assessment techniques, research standards and protocol, and research management. 13 refs., 5 figs., 3 tabs.

  17. BPA/PGE transmission support project: Final environmental assessment

    International Nuclear Information System (INIS)

    1996-12-01

    This Mitigation Action Plan describes the mitigation measures identified in the BPA/PGE Transmission Support Project Environmental Assessment. These measures commit to actions that will reduce the environmental impacts that could occur by constructing, operating and maintaining the transmission line and related facilities. They have been developed in coordination with environmental specialists, design and construction engineers and maintenance personnel. The measures will be written into the construction specifications for the project, which is expected to be constructed by contract personnel. Unless noted in the plan, the construction inspector or the line foreman would be responsible for carrying out the mitigation; environmental staff would also monitor the area for mitigation effectiveness. The right-of-way would be cleared in 1997 or 1998, and construction would begin in the spring of 1998 and be completed later that fall

  18. Environmental implications of increased biomass energy use. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Miles, T.R. Sr.; Miles, T.R. Jr. [Miles (Thomas R.), Portland, OR (United States)

    1992-03-01

    This study reviews the environmental implications of continued and increased use of biomass for energy to determine what concerns have been and need to be addressed and to establish some guidelines for developing future resources and technologies. Although renewable biomass energy is perceived as environmentally desirable compared with fossil fuels, the environmental impact of increased biomass use needs to be identified and recognized. Industries and utilities evaluating the potential to convert biomass to heat, electricity, and transportation fuels must consider whether the resource is reliable and abundant, and whether biomass production and conversion is environmentally preferred. A broad range of studies and events in the United States were reviewed to assess the inventory of forest, agricultural, and urban biomass fuels; characterize biomass fuel types, their occurrence, and their suitability; describe regulatory and environmental effects on the availability and use of biomass for energy; and identify areas for further study. The following sections address resource, environmental, and policy needs. Several specific actions are recommended for utilities, nonutility power generators, and public agencies.

  19. 77 FR 74027 - Winter Use Plan, Final Environmental Impact Statement Amended Record of Decision, Yellowstone...

    Science.gov (United States)

    2012-12-12

    ...] Winter Use Plan, Final Environmental Impact Statement Amended Record of Decision, Yellowstone National... Availability of Amended Record of Decision for the Final Environmental Impact Statement for a Winter Use Plan... Record of Decision for the Winter Use Plan for Yellowstone National Park, located in Idaho, Montana, and...

  20. 76 FR 68503 - Winter Use Plan, Final Environmental Impact Statement, Yellowstone National Park, Idaho, Montana...

    Science.gov (United States)

    2011-11-04

    ... DEPARTMENT OF THE INTERIOR National Park Service Winter Use Plan, Final Environmental Impact.... ACTION: Notice of availability of the Final Environmental Impact Statement for the Winter Use Plan... Winter Use Plan for Yellowstone National Park, located in Idaho, Montana, and [[Page 68504

  1. Final environmental statement, Liquid Metal Fast Breeder Reactor Program. Volume 1

    International Nuclear Information System (INIS)

    1975-12-01

    Information is presented under the following section headings: LMFBR program options and their compatibility with the major issues affecting commercial development, Proposed Final Environmental Statement for the LMFBR program, December 1974, WASH-1535, supplemental material, and material relating to Proposed Final Environmental Statement review

  2. 76 FR 75556 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Science.gov (United States)

    2011-12-02

    ...] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Taos Field Office, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of...) has prepared the Proposed Resource Management Plan/Final Environmental Impact Statement (Proposed RMP...

  3. 77 FR 16558 - General Management Plan/Final Environmental Impact Statement, Hampton National Historic Site...

    Science.gov (United States)

    2012-03-21

    ... Management Plan/Final Environmental Impact Statement, Hampton National Historic Site, Maryland AGENCY...) announces the availability of the Final Environmental Impact Statement for the General Management Plan.../Baltimore County Library, 320 York Avenue, Towson, Maryland 21204. Baltimore County Tourism Office and...

  4. Hellsgate Winter Range: Wildlife Mitigation Project. Final Environmental Assessment

    International Nuclear Information System (INIS)

    1995-03-01

    BPA proposes to fund the Hellsgate Winter Range: Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The Project is intended to mitigate for wildlife and wildlife habitat adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs. The Project would allow the sponsors to secure land and conduct wildlife habitat improvement and long-term management activities within the boundaries of the Colville Indian Reservation. BPA has prepared an Environmental Assessment (EA) (DOE/EA-0940) evaluating the potential environmental effects of the proposed Project (Alternative B) and No Action (Alternative A). Protection and re-establishment of riparian and upland habitat on the Colville Indian Reservation, under Alternative B, would not have a significant adverse environmental impact because: (1) there would be only limited, mostly short-term adverse impacts on soils, water quality, air quality, vegetation, and wildlife (including no effect on endangered species); and (2) there would be no adverse effect on water quantity, cultural resources, or land use. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI

  5. North Central Regional environmental characterization report. Volume 1. Final report

    International Nuclear Information System (INIS)

    1985-08-01

    This report presents available environmental information pertinent to siting a repository for high-level nuclear waste in crystalline rock in Minnesota, Wisconsin, and the Upper Peninsula of Michigan. For each of the states within the North Central Region, information is provided on those environmental disqualifying factors and regional screening variables to be used in region-to-area screening. These environmental factors and variables include existing and proposed Federal-protected lands, proximity to Federal-protected lands, components of national forest lands, existing state-protected lands, proximity to state-protected lands, population density and distribution, proximity to highly populated areas or to 1-mile square areas with 1000 or more persons, national and state forest lands, designated critical habitats for threatened and endangered spcies, surface water bodies, and wetlands. In addition, supplementary descriptive information providing a general characterization of the region is presented, as is information on environmental parameters that will be of use at later phases of screening. Also included is a discussion of the relationship between the US Department of Energy Siting Guidelines (10CFR 960) and those environmental disqualifying factors and regional screening variables to be used in the region-to-area screening process

  6. Northeastern Regional environmental characterization report. Volume 1. Final report

    International Nuclear Information System (INIS)

    1985-08-01

    This report presents available environmental information pertinent to siting a repository for high-level nuclear waste in crystalline rock in Maine, New Hampshire, Vermont, northeastern and southeastern New York, Massachusetts, Rhode Island, Connecticut, northern New Jersey, and eastern Pennsylvania. For each of the States within the Northeastern Region, information is provided on those environmental disqualifying factors and regional screening variables to be used in region-to-area screening. These environmental factors and variables include existing and proposed Federal-protected lands, components of National Forest Lands, proximity to Federal-protected lands, existing State-protected lands, proximity to State-protected lands, population density and distribution, proximity to highly populated areas, or to 1-mile-square areas with 1000 or more persons, National and State forest lands, designated critical habitats for threatened and endangered species, surface water bodies, and wetlands. In addition, supplementary descriptive information providing a general characterization of the region is presented, as is information on environmental parameters that will be of use at later phases of screening. Also included is a discussion of the relationship between the US Department of Energy Siting Guidelines (10 CFR 960) and those environmental disqualifying factors and regional screening variables to be used in the region-to-area screening process

  7. Southeastern Regional Environmental Characterization Report. Volume 1. Final report

    International Nuclear Information System (INIS)

    1985-08-01

    This report presents available environmental information pertinent to siting a repository for high-level nuclear waste in crystalline rock in central Maryland; noncoastal Virginia, North Carolina, and South Carolina; and northern Georgia. For each of the States within the Southeastern Region, information is provided on those environmental disqualifying factors and regional screening variables to be used in region-to-area screening. These environmental factors and variables include existing and proposd Federal-protected lands, components of National Forest Lands, proximity to Federal-protected lands, existing State-protected lands, proximity to State-protected lands, population density and distribution, proximity to highly populated areas, or to 1-mile-square areas with 1000 or more persons, national and State forest lands, designated critical habitats for threatened and endangered species, surface water bodies, and wetlands. In addition, supplementary descriptive information providing a general characterization of the region is presented, as is information on environmental parameters that will be of use at later phases of screening. Also included is a discussion of the relationship between the US Department of Energy Siting Guidelines (10 CFR 960) and those environmental disqualifying factors and regional screening variables to be used in the region-to-area screening process

  8. Exploring knowledge, perceptions and attitudes about generic ...

    African Journals Online (AJOL)

    Exploring knowledge, perceptions and attitudes about generic medicines among final-year health science students. ... had knowledge deficits about the safety, quality and efficacy of generic medicines. The dissemination of information about generic medicines may strengthen future knowledge, attitudes and perceptions.

  9. 78 FR 24734 - Final Environmental Impact Statement for the Construction and Operation of an Infantry Platoon...

    Science.gov (United States)

    2013-04-26

    ... DEPARTMENT OF DEFENSE Department of the Army Final Environmental Impact Statement for the... Environmental Impact Statement (PEIS), Southwest of Range 20, is not operationally feasible and has been.... The Army identified and analyzed environmental and socioeconomic impacts associated with the proposed...

  10. 75 FR 1359 - Notice of Availability of Final Environmental Impact Statement for the Proposed Construction of...

    Science.gov (United States)

    2010-01-11

    ... Environmental Impact Statement for the Proposed Construction of the Western Wake Regional Wastewater Management... Environmental Impact Statement for the proposed construction of the Western Wake Regional Wastewater Management... initial Web version of the Final Environmental Impact Statement had problems with the Web links. The web...

  11. 77 FR 23740 - Sears Point Wetland and Watershed Restoration Project, Sonoma County, CA; Final Environmental...

    Science.gov (United States)

    2012-04-20

    ...-FF08RSFC00] Sears Point Wetland and Watershed Restoration Project, Sonoma County, CA; Final Environmental... environmental impact report and environmental impact statement (EIR/EIS) for the Sears Point Wetland and..., while providing public access and recreational and educational opportunities compatible with ecological...

  12. Repair and Dredging of Bear Creek Marina Final Environmental Assessment

    Science.gov (United States)

    2007-06-01

    Lagoon and Santa Rosa Sound. Florida Department of Environmental Protection. December 2001. ––––––––, 2002. Technical Report. Florida...Biological Response of Infaunal Macroinvertebrates in the Choctawhatchee Bay System, CARRMA, Florida State University, Tallahassee, FL. Minerals

  13. Final Environmental Assessment Travis Air Force Base Burke Property Housing

    National Research Council Canada - National Science Library

    1999-01-01

    ... (40 CFR Parts 1500-1508) and Air Force Instruction 32-7061, the U.S. Air Force conducted an assessment of the potential environmental consequences of the construction of up to 281 military family housing units at Travis AFB...

  14. Final Environmental assessment for the Uranium Lease Management Program

    International Nuclear Information System (INIS)

    1995-07-01

    The US Department of Energy (DOE) has prepared a programmatic environmental assessment (EA) of the proposed action to continue leasing withdrawn lands and DOE-owned patented claims for the exploration and production of uranium and vanadium ores. The Domestic Uranium Program regulation, codified at Title 10, Part 760.1, of the US Code of Federal Regulations (CFR), gives DOE the flexibility to continue leasing these lands under the Uranium Lease Management Program (ULMP) if the agency determines that it is in its best interest to do so. A key element in determining what is in DOE's ''best interest'' is the assessment of the environmental impacts that may be attributable to lease tract operations and associated activities. On the basis of the information and analyses presented in the EA for the ULMP, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined in the National Environmental Policy Act (NEPA) of 1969 (42 United States Code 4321 et seq.), as amended.Therefore, preparation of an environmental impact statement is not required for the ULMP,and DOE is issuing this Finding, of No Significant Impact (FONSI)

  15. Final Seymour Johnson Air Force Base Housing Privatization Environmental Assessment

    Science.gov (United States)

    2009-10-01

    Natural Resources NEPA National Environmental Policy Act NLR Noise Level Reduction OSBM Office of State Budget and Management OSHA Occupational...Occupational Safety and Health Administration ( OSHA ) and similar state requirements. Earth Resources—Most of the activities associated with...including, for example, Cambodia, China, India, Japan, Korea, Malaysia , Pakistan, or the Philippine Islands; and • Native Hawaiian and Other Pacific

  16. Expansion of U. S. uranium enrichment capacity. Final environmental statement

    Energy Technology Data Exchange (ETDEWEB)

    1976-04-01

    Reasonably foreseeable environmental, social, economic, and technological costs and benefits of postulated expansion of U. S. enrichment capacity through the year 2000 and reasonably available alternatives to such expansion are described. Both the gas centrifuge and gaseous diffusion methods for the enrichment of uranium are considered in this impact assessment. (JGB)

  17. Final Environmental assessment for the Uranium Lease Management Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    The US Department of Energy (DOE) has prepared a programmatic environmental assessment (EA) of the proposed action to continue leasing withdrawn lands and DOE-owned patented claims for the exploration and production of uranium and vanadium ores. The Domestic Uranium Program regulation, codified at Title 10, Part 760.1, of the US Code of Federal Regulations (CFR), gives DOE the flexibility to continue leasing these lands under the Uranium Lease Management Program (ULMP) if the agency determines that it is in its best interest to do so. A key element in determining what is in DOE`s ``best interest`` is the assessment of the environmental impacts that may be attributable to lease tract operations and associated activities. On the basis of the information and analyses presented in the EA for the ULMP, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined in the National Environmental Policy Act (NEPA) of 1969 (42 United States Code 4321 et seq.), as amended.Therefore, preparation of an environmental impact statement is not required for the ULMP,and DOE is issuing this Finding, of No Significant Impact (FONSI).

  18. 76 FR 13429 - Notice of Availability of Final Environmental Impact Statement for the Proposed Blackfoot Bridge...

    Science.gov (United States)

    2011-03-11

    ...] Notice of Availability of Final Environmental Impact Statement for the Proposed Blackfoot Bridge Mine... Blackfoot Bridge Mine. DATES: The Final EIS is now available for public review. The BLM Record of Decision... of Availability of the Final EIS in the Federal Register. ADDRESSES: Copies of the Blackfoot Bridge...

  19. Savannah River Site waste management. Final environmental impact statement - addendum

    International Nuclear Information System (INIS)

    1995-07-01

    The purpose of this environmental impact statement is to help DOE decide how to manage over the next 30 years liquid high-level radioactive, low-level radioactive, mixed, hazardous, and transuranic wastes generated during 40 years of past operations and on-going activities (including management of wastes received from offsite) at Savannah River Site (SRS) in southwestern South Carolina. The wastes are currently stored at SRS. DOE seeks to dispose of the wastes in a cost-effective manner that protects human health and the environment. In this document, DOE assesses the cumulative environmental impacts of storing, treating, and disposing of the wastes, examines the impacts of alternatives, and identifies measures available to reduce adverse impacts. Evaluations of impacts on water quality, air quality, ecological systems, land use, geologic resources, cultural resources, socio-economics, and the health and safety of onsite workers and the public are included in the assessment

  20. Savannah River Site Waste Management Final Environmental Impact Statement Addendum

    International Nuclear Information System (INIS)

    1995-07-01

    The purpose of this environmental impact statement is to help DOE decide how to manage over the next 30 years liquid high-level radioactive, low-level radioactive, mixed, hazardous, and transuranic wastes generated during 40 years of past operations and on-going activities (including management of wastes received from offsite) at Savannah River Site (SRS) in southwestern South Carolina. The wastes are currently stored at SRS. DOE seeks to dispose of the wastes in a cost-effective manner that protects human health and the environment. In this document, DOE assesses the cumulative environmental impacts of storing, treating, and disposing of the wastes, examines the impacts of alternatives, and identifies measures available to reduce adverse impacts. Evaluations of impacts on water quality, air quality, ecological systems, land use, geologic resources, cultural resources, socio-economic, and the health and safety of onsite workers and the public are included in the assessment

  1. Environmental regulations handbook for enhanced oil recovery. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, T.D.

    1980-08-01

    A guide to environmental laws and regulations which have special significance for enhanced oil recovery (EOR) is presented. The Clean Air Act, the Clean Water Act, the Safe Drinking Water Act, Resource Conservation and Recovery Act, federal regulations, and state regulations are discussed. This handbook has been designed as a planning tool and a convenient reference source. The 16 states included comprise the major oil-producing states in various regions of the state. The major topics covered are: general guidelines for complying with environmental laws and regulations; air pollution control; water pollution control; protecting drinking water: underground injection control; hazardous waste management; and federal laws affecting siting or operation of EOR facilities. (DMC)

  2. Final environmental impact statement. Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1980-10-01

    In accordance with the National Environmental Policy Act (NEPA) of 1969, the US Department of Energy (DOE) has prepared this document as environmental input to future decisions regarding the Waste Isolation Pilot Plant (WIPP), which would include the disposal of transuranic waste, as currently authorized. The alternatives covered in this document are the following: (1) Continue storing transuranic (TRU) waste at the Idaho National Engineering Laboratory (INEL) as it is now or with improved confinement. (2) Proceed with WIPP at the Los Medanos site in southeastern New Mexico, as currently authorized. (3) Dispose of TRU waste in the first available repository for high-level waste. The Los Medanos site would be investigated for its potential suitability as a candidate site. This is administration policy and is the alternative preferred by the DOE. (4) Delay the WIPP to allow other candidate sites to be evaluated for TRU-waste disposal. This environmental impact statement is arranged in the following manner: Chapter 1 is an overall summary of the analysis contained in the document. Chapters 2 and 4 set forth the objectives of the national waste-management program and analyze the full spectrum of reasonable alternatives for meeting these objectives, including the WIPP. Chapter 5 presents the interim waste-acceptance criteria and waste-form alternatives for the WIPP. Chapters 6 through 13 provide a detailed description and environmental analysis of the WIPP repository and its site. Chapter 14 describes the permits and approvals necessary for the WIPP and the interactions that have taken place with Federal, State, and local authorities, and with the general public in connection with the repository. Chapter 15 analyzes the many comments received on the DEIS and tells what has been done in this FEIS in response. The appendices contain data and discussions in support of the material in the text

  3. Final report Hanford environmental compliance project 89-D-172

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-01-01

    The Hanford Environmental Compliance (HEC) Project is unique in that it consisted of 14 subprojects which varied in project scope and were funded from more that one program. This report describes the HEC Project from inception to completion and the scope, schedule, and cost of the individual subprojects. Also provided are the individual subproject Cost closing statements and Project completion reports accompanied by construction photographs and illustrations

  4. Final report for SNL/NM environmental drilling project

    International Nuclear Information System (INIS)

    Wemple, R.P.; Meyer, R.D.; Staller, G.E.; Layne, R.R.

    1994-11-01

    Concern for the environment and cost reduction are driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. The project has tested a variety of prototype machinery and hardware built by the industrial partner, Charles Machine Works (CMW), and SNL at several sites (Savannah River Site (SRS), Hanford, SNL, Kirtland AFB (KAFB), CMW), successfully installed usable horizontal environmental test wells at SRS and SNL/KAFB, and functioned as a clearing house for information regarding application of existing commercial machinery to a variety of governmental and commercial sites. The project has continued to test and develop machinery in FY 94. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of open-quotes cut/thrust and compact cuttings without adding large quantities of fluidclose quotes to an environmental problem site. This technology will be very cost-effective where applicable. Technology transfer and commercialization by CMW is ongoing and will continue into FY 95. Technology transfer to the private sector is ongoing and reflected in increasing machinery sales to environmental contractors. Education of regulatory agencies resulting in restructuring of appropriate regulatory standards for specification of the horizontal drilling techniques continues to be a long-range goal

  5. Final report for SNL/NM environmental drilling project

    Energy Technology Data Exchange (ETDEWEB)

    Wemple, R.P.; Meyer, R.D.; Staller, G.E. [Sandia National Labs., Albuquerque, NM (United States); Layne, R.R. [Charles Machine Works, Inc., Perry, OK (United States)

    1994-11-01

    Concern for the environment and cost reduction are driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. The project has tested a variety of prototype machinery and hardware built by the industrial partner, Charles Machine Works (CMW), and SNL at several sites (Savannah River Site (SRS), Hanford, SNL, Kirtland AFB (KAFB), CMW), successfully installed usable horizontal environmental test wells at SRS and SNL/KAFB, and functioned as a clearing house for information regarding application of existing commercial machinery to a variety of governmental and commercial sites. The project has continued to test and develop machinery in FY 94. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of {open_quotes}cut/thrust and compact cuttings without adding large quantities of fluid{close_quotes} to an environmental problem site. This technology will be very cost-effective where applicable. Technology transfer and commercialization by CMW is ongoing and will continue into FY 95. Technology transfer to the private sector is ongoing and reflected in increasing machinery sales to environmental contractors. Education of regulatory agencies resulting in restructuring of appropriate regulatory standards for specification of the horizontal drilling techniques continues to be a long-range goal.

  6. Final Environmental Assessment: Replace Hanscom AFB Middle School

    Science.gov (United States)

    2012-04-01

    2012 iv RFTA Reserve Forces Training Area SAPS Satellite Accumulation Points SF Square feet SIP State Implementation Plan SO2 Sulfur dioxide...Restoration Program (IRP), now called the Environmental Restoration Program ( ERP ). Subsequent discoveries increased the number of sites to 22. Each...EPA under CERCLA or by the Commonwealth of Massachusetts. No sites listed in the ERP for Hanscom AFB are located on or near the existing Middle

  7. Foothills Parkway Section 8B Final Environmental Report, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Blasing, T.J.; Cada, G.F.; Carer, M.; Chin, S.M.; Dickerman, J.A.; Etnier, D.A.; Gibson, R.; Harvey, M.; Hatcher, B.; Lietzske, D.; Mann, L.K.; Mulholland, P.J.; Petrich, C.H.; Pounds, L.; Ranney, J.; Reed, R.M.; Ryan, P.F.; Schweitzer, M.; Smith, D.; Thomason, P.; Wade, M.C.

    1999-07-01

    In 1994, Oak Ridge National Laboratory (ORNL) was tasked by the National Park Service (NPS) to prepare an Environmental Report (ER) for Section 8B of the Foothills Parkway in the Great Smoky Mountains National Park (GSMNP). Section 8B represents 27.7 km (14.2 miles) of a total of 115 km (72 miles) of the planned Foothills Parkway and would connect the Cosby community on the east to the incorporated town of Pittman Center to the west.

  8. Nevada Test Site, Nye County, Nevada. Final environmental impact statement

    International Nuclear Information System (INIS)

    1977-09-01

    This environmental statement for the Nevada Test Site (NTS) considers underground nuclear detonations with yields of one megaton or less, along with the preparations necessary for such detonations. The testing activities considered also include other continuing and intermittent activities, both nuclear and nonnuclear, which can best be conducted in the remote and controlled area of the Nevada Test Site. These activities are listed, with emphasis on weapons testing programs which do not remain static

  9. Final environmental impact statement. Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    1980-10-01

    In accordance with the National Environmental Policy Act (NEPA) of 1969, the US Department of Energy (DOE) has prepared this document as environmental input to future decisions regarding the Waste Isolation Pilot Plant (WIPP), which would include the disposal of transuranic waste, as currently authorized. The alternatives covered in this document are the following: (1) Continue storing transuranic (TRU) waste at the Idaho National Engineering Laboratory (INEL) as it is now or with improved confinement. (2) Proceed with WIPP at the Los Medanos site in southeastern New Mexico, as currently authorized. (3) Dispose of TRU waste in the first available repository for high-level waste. The Los Medanos site would be investigated for its potential suitability as a candidate site. This is administration policy and is the alternative preferred by the DOE. (4) Delay the WIPP to allow other candidate sites to be evaluated for TRU-waste disposal. This environmental impact statement is arranged in the following manner: Chapter 1 is an overall summary of the analysis contained in the document. Chapters 2 and 4 set forth the objectives of the national waste-management program and analyze the full spectrum of reasonable alternatives for meeting these objectives, including the WIPP. Chapter 5 presents the interim waste-acceptance criteria and waste-form alternatives for the WIPP. Chapters 6 through 13 provide a detailed description and environmental analysis of the WIPP repository and its site. Chapter 14 describes the permits and approvals necessary for the WIPP and the interactions that have taken place with Federal, State, and local authorities, and with the general public in connection with the repository. Chapter 15 analyzes the many comments received on the DEIS and tells what has been done in this FEIS in response. The appendices contain data and discussions in support of the material in the text.

  10. Final environmental impact statement: US Spent Fuel Policy. Executive summary

    International Nuclear Information System (INIS)

    1980-05-01

    The analysis of the environmental impacts for storage of domestic fuel shows that the impacts for the full range of alternatives considered are relatively small compared with available resources or background exposure of the population from natural radiation sources. The differences in impacts of storage of domestic fuel are attributed to the amount of fuel stored in Independent Spent Fuel Storage (ISFS) facilities, the storage time, and, to a lesser degree, the differences in spent fuel transportation. The differences between comparable alternatives of implementing the policy or not implementing the policy are small. The difference in impacts of storage of foreign fuel are attributed to the amount of fuel received under the policy and to the disposition mode analyzed. The impact of storage of foreign fuel (a small fraction of the amount of domestic fuel considered) is also small. As a result of the small differences in environmental impacts of all cases considered for foreign fuel, environmental impacts probably will not strongly influence the selection of the case that best meets US nonproliferation goals. Proliferation benefits of the various cases analyzed vary significantly. The structure and level of fee charged for storage of spent fuel will affect the degree of participation in the spent fuel storage program by utilities. However, the range of participation is within the range of alternatives analyzed in the draft EISs on storage of US and foreign fuels, for which the environmental effects were found to be relatively small. The fee computed on the basis of full recovery of government costs should not significantly affect the cost of generating nuclear power

  11. Nevada Test Site, Nye County, Nevada. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1977-09-01

    This environmental statement for the Nevada Test Site (NTS) considers underground nuclear detonations with yields of one megaton or less, along with the preparations necessary for such detonations. The testing activities considered also include other continuing and intermittent activities, both nuclear and nonnuclear, which can best be conducted in the remote and controlled area of the Nevada Test Site. These activities are listed, with emphasis on weapons testing programs which do not remain static.

  12. Test Area B-70 Final Range Environmental Assessment, Revision 1

    Science.gov (United States)

    2009-06-01

    environmental impacts to Eglin ecosystems. Some of the main invasive non-native species of concern are Chinese tallow, cogon grass , Japanese climbing fern...2003a). Typical plant species include St. John’s Wort (Hypericum brachyphyllum) around the margins with spikerush (Eleocharis spp.), yellow-eyed grass ...Karst Pond Yellow-eyed Grass Xyris longisepala SE -- Pineland Hoary Pea Tephrosia mohrii ST -- Pineland Wild Indigo Baptista calycosa var villosa ST

  13. Humeca Uranium Mill. Nuclear Regulatory Commission's final environmental statement

    International Nuclear Information System (INIS)

    1976-04-01

    The Humeca Uranium Mill is a carbonate-leach uranium ore refining plant with a capacity of about 500 tons of ore per day. Although the present licensing action does not extend to mining, the statement considers the environmental impact of the combined mining and milling project to be conducted by Rio Algom Corporation. The environmental impact, including adverse and beneficial environmental effects of the Rio Algom Uranium Mill, is as follows. (1) Temporary (about 10 years) reassignment of use of about 120 acres of land out of the total 2,573 acres controlled by Rio Algom Corporation. (2) The removal of an estimated 8.4 million pounds of uranium concentrates as a natural resource. This material will eventually be used to produce approximately 6.09 x 10 6 megawatt-days of electricity. (3) Removal and diversion of approximately 100 gallons per minute of local groundwater. (4) Stimulation of the local economy through payment of taxes and direct employment of about 200 persons in San Juan County over the next 10 years. Rio Algom estimates they will pay out over $11 million in salaries over this period of time. (5) The creation of stabilized tailings piles covering about 45 acres involving approximately 1,850,000 tons of solids containing solidified waste chemical and radioactive uranium and its daughter products. (6) Discharge of small quantities of chemicals and radioactive materials (that are not expected to produce discernible effects) into the local environs

  14. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  15. Willow Creek Wildlife Mitigation Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1995-04-01

    Today's notice announces BPA's proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA's obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council's 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI

  16. Regional environmental impacts of methanol-fueled vehicles. Final report

    International Nuclear Information System (INIS)

    Belian, T.; Morris, R.E.; Ligocki, M.P.; Whitten, G.Z.

    1991-01-01

    The objectives of the study were to obtain, through simulation modeling, preliminary estimates of the regional environmental impacts methanol-fueled vehicles and to estimate the sensitivity of the model to important parameters and assumptions that affect the calculation of the impacts. The regional environmental effects of the use of M85 fuel (85 percent methanol and 15 percent gasoline) and M100 (neat methanol) relative to gasoline (an indoline blend) were estimated using a Lagrangian (trajectory) acid deposition model. The Comprehensive Chemistry Acid Deposition Model (CCADM), contains a detailed treatment of gas-phase and aqueous-phase chemistry and associated mass transfer, but provides for a less comprehensive representation of advection and diffusion. Two different meteorological regimes were analyzed: clear sky conditions and cloudy skies with a rain event. The study also included a review of gas- and aqueous-phase chemistry, with particular emphasis on methanol. The CCADM chemical mechanism was updated to include state-of-the-science (as of 1990) gas- and aqueous-phase chemistry including methanol chemistry. The CCADM was then used to analyze the regional environmental impacts from the use of methanol fuels. In performing such an analysis it was necessary to make several assumptions. The sensitivity of the analysis was examined through a series of simulations that varied key input parameters within their ranges of uncertainty

  17. Final environmental statement related to the operation of River Bend Station (Docket No. 50-458)

    International Nuclear Information System (INIS)

    1985-01-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with the operation of River Bend Station, pursuant to the National Environment Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs

  18. Final Programmatic Environmental Impact Statement for stockpile stewardship and management

    International Nuclear Information System (INIS)

    1996-09-01

    The Department of Energy (DOE) has been directed by the President and Congress to maintain the safety and reliability of the reduced nuclear weapons stockpile in the absence of underground nuclear testing. In order to fulfill that responsibility, DOE has developed a Stockpile Stewardship and Management Program to provide a single highly integrated technical program for maintaining the continued safety and reliability of the nuclear stockpile. The Stockpile Stewardship and Management Programmatic Environmental Impact Statement (PEIS) describes and analyzes alternative ways to implement the proposed actions for the Stockpile Stewardship and Management Program. This document contains Volume II which consists of Appendices A through H

  19. Stability of volatile organics in environmental soil samples. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Maskarinec, M.P.; Bayne, C.K.; Jenkins, R.A.; Johnson, L.H.; Holladay, S.K.

    1992-11-01

    This report focuses on data generated for the purpose of establishing the stability of 19 volatile organic compounds in environmental soil samples. The study was carried out over a 56 day (for two soils) and a 111 day (for one reference soil) time frame and took into account as many variables as possible within the constraints of budget and time. The objectives of the study were: 1) to provide a data base which could be used to provide guidance on pre-analytical holding times for regulatory purposes; and 2) to provide a basis for the evaluation of data which is generated outside of the currently allowable holding times.

  20. 78 FR 14111 - Final Candidate Conservation Agreement With Assurances, Final Environmental Assessment, and...

    Science.gov (United States)

    2013-03-04

    ... Finding of No Significant Impact; Lesser Prairie Chicken, Oklahoma AGENCY: Fish and Wildlife Service... assessment (EA) and the draft Finding of No Significant Impact (FONSI) under the National Environmental... in Alfalfa, Beaver, Beckham, Cimarron, Custer, Dewey, Ellis, Harper, Major, Roger Mills, Texas...

  1. Environmental impacts of thermochemical biomass conversion. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Elliott, D.C.; Hart, T.R.; Neuenschwander, G.G.; McKinney, M.D.; Norton, M.V.; Abrams, C.W. [Pacific Northwest Lab., Richland, WA (United States)

    1995-06-01

    Thermochemical conversion in this study is limited to fast pyrolysis, upgrading of fast pyrolysis oils, and gasification. Environmental impacts of all types were considered within the project, but primary emphasis was on discharges to the land, air, and water during and after the conversion processes. The project discussed here is divided into five task areas: (1) pyrolysis oil analysis; (2) hydrotreating of pyrolysis oil; (3) gas treatment systems for effluent minimization; (4) strategic analysis of regulatory requirements; and (5) support of the IEA Environmental Systems Activity. The pyrolysis oil task was aimed at understanding the oil contaminants and potential means for their removal. The hydrotreating task was undertaken to better define one potential means for both improving the quality of the oil but also removing contaminants from the oil. Within Task 3, analyses were done to evaluate the results of gasification product treatment systems. Task 4 was a review and collection of regulatory requirements which would be applicable to the subject processes. The IEA support task included input to and participation in the IEA Bioenergy activity which directly relates to the project subject. Each of these tasks is described along with the results. Conclusions and recommendations from the overall project are given.

  2. Environmental impacts of thermochemical biomass conversion. Final report

    International Nuclear Information System (INIS)

    Elliott, D.C.; Hart, T.R.; Neuenschwander, G.G.; McKinney, M.D.; Norton, M.V.; Abrams, C.W.

    1995-06-01

    Thermochemical conversion in this study is limited to fast pyrolysis, upgrading of fast pyrolysis oils, and gasification. Environmental impacts of all types were considered within the project, but primary emphasis was on discharges to the land, air, and water during and after the conversion processes. The project discussed here is divided into five task areas: (1) pyrolysis oil analysis; (2) hydrotreating of pyrolysis oil; (3) gas treatment systems for effluent minimization; (4) strategic analysis of regulatory requirements; and (5) support of the IEA Environmental Systems Activity. The pyrolysis oil task was aimed at understanding the oil contaminants and potential means for their removal. The hydrotreating task was undertaken to better define one potential means for both improving the quality of the oil but also removing contaminants from the oil. Within Task 3, analyses were done to evaluate the results of gasification product treatment systems. Task 4 was a review and collection of regulatory requirements which would be applicable to the subject processes. The IEA support task included input to and participation in the IEA Bioenergy activity which directly relates to the project subject. Each of these tasks is described along with the results. Conclusions and recommendations from the overall project are given

  3. Columbia River system operation review. Final environmental impact statement

    International Nuclear Information System (INIS)

    1995-11-01

    Since the 1930's, the Columbia River has been harnessed for the benefit of the Northwest and the nation. Federal agencies have built 30 major dams on the river and its tributaries. Dozens of non-Federal projects have been developed as well. The dams provide flood control, irrigation, navigation, hydro-electric power generation, recreation, fish and wildlife, and streamflows for wildlife, anadromous fish, resident fish, and water quality. This is Appendix F of the Environmental Impact Statement for the Columbia River System, focusing on irrigation issues and concerns arrising from the Irrigation and Mitigation of impacts (M ampersand I) working Group of the SOR process. Major subheadings include the following: Scope and process of irrigation/M ampersand I studies; Irrigation/M ampersand I in the Columbia Basin Today including overview, irrigated acreage and water rights, Irrigation and M ampersand I issues basin-wide and at specific locations; and the analysis of impacts and alternative for the Environmental Impact Statement

  4. Lower Columbia River Terminal Fisheries Research Project : Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-04-01

    This notice announces BPA`S`s decision to fund the Oregon Department of Fish and Wildlife (ODFW), the Washington Department of Fish and Wildlife (WDFW), and the Clatsop Economic Development Committee for the Lower Columbia River Terminal Fisheries Research Project (Project). The Project will continue the testing of various species/stocks, rearing regimes, and harvest options for terminal fisheries, as a means to increase lower river sport and commercial harvest of hatchery fish, while providing both greater protection of weaker wild stocks and increasing the return of upriver salmon runs to potential Zone 6 Treaty fisheries. The Project involves relocating hatchery smolts to new, additional pen locations in three bays/sloughs in the lower Columbia River along both the Oregon and Washington sides. The sites are Blind Slough and Tongue Point in Clatsop County, Oregon, and Grays Bay/Deep River, Wahkiakum County, Washington. The smolts will be acclimated for various lengths of time in the net pens and released from these sites. The Project will expand upon an existing terminal fisheries project in Youngs Bay, Oregon. The Project may be expanded to other sites in the future, depending on the results of this initial expansion. BPA`S has determined the project is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required, and BPA`S is issuing this FONSI.

  5. Final Environmental Impact Statement (FEIS)/Final Environmental Impact Report (FEIR). Otis Air National Guard Base, Wastewater Treatment Facility

    Science.gov (United States)

    1990-06-01

    and G.E. Ness, 1982, Survival of Vibrio cholerae and Escherichia coli in Estuarine Water and Sediments, Applied and Environmental Microbiology, 43...and publications in areas of water and wastewater treatment. David Tomasko, Ph.D., 1985. University of New Mexico . Staff Hydrogeologist. Research...Reserve in California. We are working on EIS’s for the U.S. Air Force Base Closings in realignment in California, New Mexico and Washington, and a very

  6. Environmental friendly high efficient light source plasma lamp - Final report

    Energy Technology Data Exchange (ETDEWEB)

    Courret, G.; Calame, L. [Haute Ecole d' ingenierie et de gestion du canton de Vaud, Institut de micro et nano techniques, Yverdon-les-Bains (Switzerland); Meyer, A. [Solaronix SA, Aubonne (Switzerland)

    2007-07-01

    This illustrated final report for the Swiss Federal Office of Energy (SFOE) takes a look at work done on the development of a sulphur-based plasma lamp. In 2007, the capability of a new modulator has been explored. The most important results are discussed. With the production of a 1.2 cm{sup 3} bulb, the way towards the production of a 100 W lamp has been opened. The authors comment that modulation by impulses increases the luminous efficiency in comparison to modulation using a continuous sinusoidal wave. The report deals with the history of the project, the development of the new modulator, the use of rotational effects and the optimisation of the amount of active substances - tellurium and selenium - in the bulb. The electromagnetic coupling system used is described and discussed.

  7. Generic data base for security equipment and its utility in the safeguards inspection process. Final report 8151-79-FR-16

    International Nuclear Information System (INIS)

    Scala, S.

    1979-01-01

    This report contains material presented at the Nuclear Regulatory Commission (NRC) conference of regional inspectors in Atlanta, Georgia, on January 17, 1979. It describes the contents of the generic data base for security equipment, which was developed by SRI for NRC under a Sandia Laboratories' subcontract, and examines its potential utility in the process of inspection of NRC-licensed facilities

  8. Environmental management requirements/defensible costs project. Final report

    International Nuclear Information System (INIS)

    1996-02-01

    Lockheed Idaho Technologies Company (LITCO) used a systems engineering approach to develop the first formal requirements baseline for Idaho National Engineering Laboratory (INEL) Environmental Management (EM) Programs. The recently signed Settlement Agreement with the State of Idaho (Batt Agreement), along with dramatically reduced EM funding targets from Department of Energy (DOE) headquarters, drove the immediacy of this effort. Programs have linked top-level requirements to work scope to cost estimates. All EM work, grouped by decision units, was scrubbed by INEL EM programs and by an independent open-quotes Murder Board.close quotes Direct participation of upper level management from LITCO and the DOE-Idaho Operations Office ensured best information and decisions. The result is a scrubbed down, defensible budget tied to top-level requirements for use in the upcoming DOE-Headquarters' budget workout, the Internal Review Board, the FY98 Activity Data Sheets submittal, and preparation of the FY97 control accounts and out-year plans. In addition to the remarkable accomplishments during the past eight weeks, major issues were identified and documented and follow-on tasks are underway which will lead to further improvements in INEL EM program management

  9. Columbia River system operation review. Final environmental impact statement

    International Nuclear Information System (INIS)

    1995-11-01

    This study attempts to identify and analyze the impacts of the System Operating Strategy (SOS) alternatives on cultural resources. The impacts include effects on Native American traditional cultural values, properties and practices. They also include effects on archeological or historic properties meeting the criteria of the National Register of Historic Places. In addition to responding to the requirements of the National Environmental Policy Act (NEPA), this analysis addresses the requirements of the National Historic Preservation Act (NHPA), the Archeological Resources Protection Act (ARPA), the Native American Graves Protection and Repatriation Act (NAGPRA), the Native American Religious Freedom Act (NARFA), and other relevant legislation. To meet their legally mandated cultural resources requirements, the SOR agencies will develop agreements and Implementation Plans with the appropriate State Historic Preservation Officers (SHPOs), Tribes, and the Advisory Council on Historic Preservation (ACHP) detailing the measures necessary to best manage the resource. The planning and implementation activities will be staged over a number of years in consultation with affected Tribes

  10. Environmental management requirements/defensible costs project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    Lockheed Idaho Technologies Company (LITCO) used a systems engineering approach to develop the first formal requirements baseline for Idaho National Engineering Laboratory (INEL) Environmental Management (EM) Programs. The recently signed Settlement Agreement with the State of Idaho (Batt Agreement), along with dramatically reduced EM funding targets from Department of Energy (DOE) headquarters, drove the immediacy of this effort. Programs have linked top-level requirements to work scope to cost estimates. All EM work, grouped by decision units, was scrubbed by INEL EM programs and by an independent {open_quotes}Murder Board.{close_quotes} Direct participation of upper level management from LITCO and the DOE-Idaho Operations Office ensured best information and decisions. The result is a scrubbed down, defensible budget tied to top-level requirements for use in the upcoming DOE-Headquarters` budget workout, the Internal Review Board, the FY98 Activity Data Sheets submittal, and preparation of the FY97 control accounts and out-year plans. In addition to the remarkable accomplishments during the past eight weeks, major issues were identified and documented and follow-on tasks are underway which will lead to further improvements in INEL EM program management.

  11. Columbia River final environmental impact statement. Appendix B: Air quality

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. This appendix consists of eight chapters. Chapter 1 describes the air quality issues that were raised in the SOR scoping process and provides an overview of the study process used to evaluate air quality effects from various system operation alternatives. Chapter 2 describes the Federal, state, and local programs that regulate air quality and discusses the air quality standards that are relevant to the analysis. It also gives an overview of the limatology of the region and the existing air quality in the Columbia River Basin, including areas of non-attainment for relevant air quality standards. Chapter 3 presents the methods this study uses for the analysis of air quality and for the evaluation of human health effects from air pollutants. Chapter 4 provides the study results for the System Operating Strategy (SOS) alternatives and potential mitigation measures. Chapter 5 compares impacts on air quality and human health across alternatives, and discusses mitigation measures and cumulative effects. Chapters 6, 7, and 8 contain the list of preparers, glossary, and references, respectively. Technical exhibits supporting the analysis are also included

  12. Final Environmental Assessment for the California Space Center at Vandenberg Air Force Base, California

    Science.gov (United States)

    2010-06-02

    rooted , mesophylic plant species that Chapter 3. Affected Environment Final Environmental Assessment - California Space Center, Vandenberg Air...Chapter 3. Affected Environment 3-12 Final Environmental Assessment - California Space Center, Vandenberg Air Force Base the root and debris zone of the...protruding objects, slippery soils or mud, and biological hazards including vegetation (i.e. poison oak and stinging nettle ), animals (i.e. insects

  13. Final Generic Environmental Impact Statement. Handling and storage of spent light water power reactor fuel. Volume 2. Appendices

    International Nuclear Information System (INIS)

    1979-08-01

    This volume contains the following appendices: LWR fuel cycle, handling and storage of spent fuel, termination case considerations (use of coal-fired power plants to replace nuclear plants), increasing fuel storage capacity, spent fuel transshipment, spent fuel generation and storage data, characteristics of nuclear fuel, away-from-reactor storage concept, spent fuel storage requirements for higher projected nuclear generating capacity, and physical protection requirements and hypothetical sabotage events in a spent fuel storage facility

  14. Final work plan : environmental site investigation at Sylvan Grove, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M. (Environmental Science Division)

    2012-07-15

    what future CCC/USDA actions may be necessary, with the ultimate goal of achieving classification of the Sylvan Grove site at no further action status. The proposed activities are to be performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory, a nonprofit, multidisciplinary research center operated by the UChicago Argonne, LLC, for the U.S. Department of Energy. Argonne provides technical assistance to the CCC/USDA concerning environmental site characterization and remediation at former grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. That document should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Sylvan Grove.

  15. Navajo transmission project. Final Environmental Impact Statement (FEIS)

    International Nuclear Information System (INIS)

    1997-08-01

    Dine Power Authority, a Navajo Nation enterprise, proposes to construct a 500 kilovolt transmission line planned to deliver electrical power from the Shiprock Substation in northwestern New Mexico to the Marketplace Substation in southern Nevada. The line would relieve constraints on transmission of electricity west from the Four Corners area; improve operational flexibility and reliability of the overall system; and allow increased economical transfers, sales, and purchases in the Rocky Mountains/Four Corners/Desert Southwest region. Also, the project allows an opportunity for the Navajo Nation to participate in the electrical utility industry and promote economic development to benefit the people of the Navajo Nation. Six alternatives were considered and include (1) energy conservation and electric load management, (2) new generation facilities, (3) use of existing transmission systems, (4) alternative transmission technologies, (5) no action, and (6) the proposed action. For the proposed action, the following alternative routes and ancillary facility locations are addressed in the EIS: four alternative routes and five substations in the eastern portion of the project area; and six alternative routes, three substation sites, and a microwave communication facility in the western portion of the project area. The existing condition of the environmental resources in the project area is described, and potential impacts on those resources as a result of the proposed action are addressed. The impacts of the proposed action would be caused mainly by access roads, tower sites, and other associated facilities on soils, vegetation, wildlife, and cultural and paleontological resources; and the impact of the transmission line's presence on visual resources and land uses. Public comments on the draft EIS are addressed in this FEIS

  16. Environmental Safety and Health Analytical Laboratory, Pantex Plant, Amarillo, Texas. Final Environmental Assessment

    International Nuclear Information System (INIS)

    1995-06-01

    The US Department of Energy (DOE) has prepared an Environmental Assessment (EA) of the construction and operation of an Environmental Safety and Health (ES ampersand H) Analytical Laboratory and subsequent demolition of the existing Analytical Chemistry Laboratory building at Pantex Plant near Amarillo, Texas. In accordance with the Council on Environmental Quality requirements contained in 40 CFR 1500--1508.9, the Environmental Assessment examined the environmental impacts of the Proposed Action and discussed potential alternatives. Based on the analysis of impacts in the EA, conducting the proposed action, construction of an analytical laboratory and demolition of the existing facility, would not significantly effect the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA) and the Council on Environmental Quality regulations in 40 CFR 1508.18 and 1508.27

  17. Final environmental statement, Liquid Metal Fast Breeder Reactor Program. Volume 3

    International Nuclear Information System (INIS)

    1975-12-01

    Included are copies of thirty-four comment letters on the Proposed Final Environmental Statement together with the ERDA replies to these letters. The letters were received from Federal, State, and local agencies, environmental and public interest groups, members of the academic and industrial communities, and individual citizens

  18. Final environmental statement, Liquid Metal Fast Breeder Reactor Program. Volume 2

    International Nuclear Information System (INIS)

    1975-12-01

    Included are copies of fifty-six comment letters on the Proposed Final Environmental Statement together with the ERDA replies to these letters. The letters were received from Federal, State, and local agencies, environmental and public interest groups, members of the academic and industrial communities, and individual citizens

  19. Idaho National Engineering and Environmental Laboratory Environmental Technologies Proof-of-Concepts. Final report FY-96

    Energy Technology Data Exchange (ETDEWEB)

    Barrie, S.L.; Carpenter, G.S.; Crockett, A.B. [and others

    1997-04-01

    The Idaho National Engineering and Environmental Laboratory Environmental Technologies Proof-of-Concept Project was initiated for the expedited development of new or conceptual technologies in support of groundwater fate, transport, and remediation; buried waste characterization, retrieval, and treatment; waste minimization/pollution prevention; and spent fuel handling and storage. In Fiscal Year 1996, The Idaho National Engineering and Environmental Laboratory proposed 40 development projects and the Department of Energy funded 15. The projects proved the concepts of the various technologies, and all the technologies contribute to successful environmental management.

  20. Idaho National Engineering and Environmental Laboratory Environmental Technologies Proof-of-Concepts. Final report FY-96

    International Nuclear Information System (INIS)

    Barrie, S.L.; Carpenter, G.S.; Crockett, A.B.

    1997-04-01

    The Idaho National Engineering and Environmental Laboratory Environmental Technologies Proof-of-Concept Project was initiated for the expedited development of new or conceptual technologies in support of groundwater fate, transport, and remediation; buried waste characterization, retrieval, and treatment; waste minimization/pollution prevention; and spent fuel handling and storage. In Fiscal Year 1996, The Idaho National Engineering and Environmental Laboratory proposed 40 development projects and the Department of Energy funded 15. The projects proved the concepts of the various technologies, and all the technologies contribute to successful environmental management

  1. Disposal of chemical agents and munitions stored at Umatilla Depot Activity, Hermiston, Oregon. Final Phase 1 environmental report

    Energy Technology Data Exchange (ETDEWEB)

    Zimmerman, G.P.; Hillsman, E.L.; Johnson, R.O.; Miller, R.L.; Patton, T.G.; Schoepfle, G.M.; Tolbert, V.R.; Feldman, D.L.; Hunsaker, D.B. Jr.; Kroodsma, R.L.; Morrissey, J.; Rickert, L.W.; Staub, W.P.; West, D.C.

    1993-02-01

    The Umatilla Depot Activity (UMDA) near Hermiston, Oregon, is one of eight US Army installations in the continental United States where lethal unitary chemical agents and munitions are stored, and where destruction of agents and munitions is proposed under the Chemical Stockpile Disposal Program (CSDP). The chemical agent inventory at UMDA consists of 11.6%, by weight, of the total US stockpile. The destruction of the stockpile is necessary to eliminate the risk to the public from continued storage and to dispose of obsolete and leaking munitions. In 1988 the US Army issued a Final Programmatic Environmental Impact Statement (FPEIS) for the CSDP that identified on-site disposal of agents and munitions as the environmentally preferred alternative (i.e., the alternative with the least potential to cause significant adverse impacts), using a method based on five measures of risk for potential human health and ecosystem/environmental effects; the effectiveness and adequacy of emergency preparedness capabilities also played a key role in the FPEIS selection methodology. In some instances, the FPEIS included generic data and assumptions that were developed to allow a consistent comparison of potential impacts among programmatic alternatives and did not include detailed conditions at each of the eight installations. The purpose of this Phase 1 report is to examine the proposed implementation of on-site disposal at UMDA in light of more recent and more detailed data than those included in the FPEIS. Specifically, this Phase 1 report is intended to either confirm or reject the validity of on-site disposal for the UMDA stockpile. Using the same computation methods as in the FPEIS, new population data were used to compute potential fatalities from hypothetical disposal accidents. Results indicate that onsite disposal is clearly preferable to either continued storage at UMDA or transportation of the UMDA stockpile to another depot for disposal.

  2. Generic safety issues. Evaluation of international surveys, studies and expert reports in other countries. Final report; Generische Sicherheitsfragen. Auswertungen von internationalen Untersuchungen, Studien und Gutachten anderer Staaten. Abschlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Eismar, Shanna; Wenke, Rainer

    2017-09-15

    The GeSi and GeSi-International databases developed in the predecessor projects were continued to be maintained and developed further in this project. The GeSi database serves on the one hand for reflecting the current state of the art in science and technology in the field of generic issues and also as a tool in the area of knowledge management. Hence the database can also be used very well as a steering instrument for project planning at GRS and BMUB. Within the term of the project, four issues from national and international operating experience, research results and events or accidents that occurred have been included in the database. The review of the issues contained in the database showed up the more or less strong need for revision or adaptation of a range of generic issues to the state of the art in science and technology. Due to the limited volume of the project, only those issues could be dealt with which were most in need of revision. As a result, 23 issues were subjected to a more detailed review during the project. The 7th review meeting of the contracting parties to the Convention on Nuclear Safety (CNS) was held close to the ending of this project. The national reports of the 5th, 6th and as far as possible from the 7th CNS meeting have been evaluated with respect to important generic safety issues. Within the project 13 issues could be integrated into already existing ones. Eight issues have been removed from the database. Therefore at present (September 2017), there are 288 generic safety issues in the GeSi database.

  3. Environmentally benign manufacturing of compact disc stampers[Final Phase II report]; FINAL

    International Nuclear Information System (INIS)

    None

    1999-01-01

    Optical data storage is currently a$10B/yr. business. With the introduction of the high capacity Digital Versatile Disc (D/D) as well as the continued growth of CD-Audio and CD-ROM worldwide sales of optical data products as a whole are growing at rate of more than 10% per year. In North America, more than 2.5 billion optical discs will be sold in 1998. By 1999, the numbers of optical discs produced for the North American market will grow to almost three billion. The optical disc manufacturing industry is dominated by Asian and European companies (e.g. Sony of Japan and Philips of Netherlands). Prism Corporation has created a process that could significantly improve US competitiveness in the business of optical disc production. The objectives of the Phase II STTR project were to build and test an ion machining system (IMS) for stamper fabrication, prove overall manufacturing system feasibility by fabrication stampers and replicas, and evaluate alternative materials and alternative process parameters to optimize the process. During tie period of the Phase II project Prism Corporation was able to meet these objectives. In the course of doing so, adjustments had been made to better the project and in turn the final product. An ion machining system was designed and built that produced stampers ready for the molding process. Also, many control steps in the manufacturing process were studied to improve the current process and make it even more compatible with the industry standards, fitting seamlessly into current manufacturing lines

  4. Generic environmental impact statement in support of rulemaking on radiological criteria for decommissioning of NRC-licensed nuclear facilities. Appendices; Draft report for comment -- Volume 2

    International Nuclear Information System (INIS)

    1994-08-01

    The action being considered in this draft Generic Environmental Impact Statement (GEIS) is an amendment to the Nuclear Regulatory Commission's (NRC) regulations in 10 CFR Part 20 to include radiological criteria for decommissioning of lands and structures at nuclear facilities. Under the National Environmental Policy Act (NEPA), all Federal agencies must consider the effect of their actions on the environment. To fulfill NRC's responsibilities under NEPA, the Commission is preparing this GEIS which analyzes alternative courses of action and the costs and impacts associated with those alternatives. In preparing the GEIS, the following approach was taken: (1) a listing was developed of regulatory alternatives for establishing radiological criteria for decommissioning; (2) for each alternative, a detailed analysis and comparison of incremental impacts, both radiological and nonradiological, to workers, members of the public, and the environment, and costs, were performed; and (3) based on the analysis of impacts and costs, preliminary recommendations were provided. Contained in the GEIS are recommendations related to the definition of decommissioning, the scope of rulemaking, the radiological criteria, restrictions on use, citizen participation, use of the GEIS in site-specific cases, and minimization of contamination

  5. Generic environmental impact statement in support of rulemaking on radiological criteria for decommissioning of NRC-licensed nuclear facilities. Main report; Draft report for comment: Volume 1

    International Nuclear Information System (INIS)

    1994-08-01

    The action being considered in this draft Generic Environmental Impact Statement (GEIS) is an amendment to the Nuclear Regulatory Commission's (NRC) regulations in 10 CFR Part 20 to include radiological criteria for decommissioning of lands and structures at nuclear facilities. Under the National Environmental Policy Act (NEPA), all Federal agencies must consider the effect of their actions on the environment. To fulfill NRC's responsibilities under NEPA, the Commission is preparing this GEIS which analyzes alternative courses of action and the costs and impacts associated with those alternatives. In preparing the GEIS, the following approach was taken: (1) a listing was developed of regulatory alternatives for establishing radiological criteria for decommissioning; (2) for each alternative, a detailed analysis and comparison of incremental impacts, both radiological and nonradiological, to workers, members of the public, and the environment, and costs, were performed; and (3) based on the analysis of impacts and costs, preliminary recommendations were provided. Contained in the GEIS are recommendations related to the definition of decommissioning, the scope of rulemaking, the radiological criteria, restrictions on use, citizen participation, use of the GEIS in site-specific cases, and minimization of contamination

  6. Final environmental impact statement supplement for wastewater management systems, North Jefferson County, Kentucky wastewater facilities

    International Nuclear Information System (INIS)

    1992-12-01

    The Final Environmental Impact Statement Supplement (FEISS) serves to update the wastewater treatment alternatives presented in the original EIS (The North County Area Environmental Impact Statement, Jefferson County, KY, July 1984), determine the best alternative, and compare that alternative to the Louisville and Jefferson County Metropolitan Sewer District's North County Action Plan (NCAP). The NCAP was determined to have the greatest cost effectiveness, lowest environmental impact, and best implementability and reliability and so is the preferred alternative in the FEISS. Significant environmental impacts of the alternative are described and mitigative measures discussed

  7. Beaufort Sea planning area oil and gas Lease Sale 170. Final environmental impact statement

    International Nuclear Information System (INIS)

    1998-02-01

    This environmental impact statement (EIS) assesses Lease Sale 170 proposed for August 1998 and comprised of 363 lease blocks in the Beaufort Sea planning area. The analysis addresses the significant environmental and socioeconomic concerns identified in the scoping process. Scoping consisted of input from State and Federal agencies, the petroleum industry, Native groups, environmental and public interest groups, and concerned individuals. The potential effects expected from the interaction between environmental resources and OCS-related activities were determined with respect to available scientific information and traditional knowledge. This EIS incorporates information from the Final EIS for the Beaufort Sea OCS Sale 144 (USD01, MMS, 1996a)

  8. Rocky Flats Plant site, Golden, Jefferson County, Colorado. Final environmental impact statement (final statement to ERDA 1545-D)

    International Nuclear Information System (INIS)

    1980-04-01

    This final Environmental Impact Statement (FEIS) incorporates a number of changes as a result of the comments and suggestions received on the Draft Environmental Impact Statement. The major additions and revisions of this first of the three-volume statement are discussed. Chapter titles are: summary; background; environmental impacts; unavoidable adverse environmental effects; alternatives; relationship between short-term uses and long-term productivity; relationship to land-use plans; irreversible and irretrievable commitments of resources; and, environmental trade-off analysis. Chapter 2 includes updated information on seismic stability of the area and seismic design criteria are presented. A mechanism for dissemination of the data from seismic studies in progress is specified. The Plant's personnel protection program with respect to nonradioactive materials, Plant security systems, and the emergency plans of the Plant and the State of Colorado are discussed in greater detail. Material on the environmental monitoring program was updated to reflect current monitoring and measuring conditions. Discussions of various soil sampling methods, plutonium background levels in soil, and plutonium soil standards, are presented. The dose calculations in Chapter 3 were extended to include comparisons of organ doses to natural background organ doses as well as the dose to the whole body. Doses to women and children are considered by exposure pathway as well as those for Standard Man. All credible accident scenarios were reviewed and details updated. A comprehensive discussion of genetic and health effects is presented in Appendices G-2 through G-4. Chapter 5 was revised to reflect the effort and cost involved in decontaminating soil, both on-site and offsite, relative to various decontamination criteria which might be employed

  9. Final environmental statement for La Crosse Boiling Water Reactor: (Docket No. 50-409)

    International Nuclear Information System (INIS)

    1980-04-01

    A Final Environmental Statement for the Dairyland Power Cooperative for the conversion from a provisional to a full-term operating license for the La Crosse Boiling Water Reactor, located in Vernon County, Wisconsin, has been prepared by the Office of Nuclear Reactor Regulation. This statement provides a summary of environmental impacts and adverse effects of operation of the facility, and a consideration of principal alternatives (including removal of LACBWR from service, alternative cooling methodology, and alternative waste treatment systems). Also included are the comments of federal, state, and local governmental agencies and certain non-governmental organizations on the La Crosse Draft Environmental Statement and staff responses to these comments. After weighing environmental, economic, and technical benefits and liabilities, the staff recommends conversion from a provisional operating license to a full-term operating license, subject to specific environmental protection limitations. An operational monitoring program shall be established as part of the Environmental Technical Specifications. 64 refs., 20 figs., 48 tabs

  10. Geothermal environmental studies, Heber Region, Imperial Valley, California. Environmental baseline data acquisition. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1977-02-01

    The Electric Power Research Institute (EPRI) has been studying the feasibility of a Low Salinity Hydrothermal Demonstration Plant as part of its Geothermal Energy Program. The Heber area of the Imperial Valley was selected as one of the candidate geothermal reservoirs. Documentation of the environmental conditions presently existing in the Heber area is required for assessment of environmental impacts of future development. An environmental baseline data acquisition program to compile available data on the environment of the Heber area is reported. The program included a review of pertinent existing literature, interviews with academic, governmental and private entities, combined with field investigations and meteorological monitoring to collect primary data. Results of the data acquisition program are compiled in terms of three elements: the physical, the biological and socioeconomic settings.

  11. Preliminary environmental impact assessment for the final disposal of vanadium hazardous wastes

    International Nuclear Information System (INIS)

    Leyva Bombuse, D.; Peralta, J.L.; Gil Castillo, R.

    2006-01-01

    The aim of the present paper is the environmental impact assessment for the final management of vanadium wastes. The assessed practice is proposed as a final solution for a real problem in Cuba, related with the combustion fossil fuel burn in the electric generation. The study case, embrace the interim storage of hazardous wastes with high vanadium contents (5.08 T) and other heavy metals traces (Cr, Zn). According to the Cuban conditions (tacking into account the environmental regulations and infrastructure lack for the hazardous wastes disposal), it was decided the terrestrial dilution as a final disposal way. The environmental impact assessment methodology used, take into account, in the analyzed management practice, the actions, factors and environmental impacts. The positives and more relevant impacts were obtained for the socioeconomic means. The negative and irrelevant impacts were associated to the biotic and abiotic means. Socioeconomic factors were the most affected and the biotic and abiotic factors were less affected. The waste handling was the most relevant environmental action. According to the evaluated conditions, the obtained results showed that is feasible the terrestrial dilution as a sustainability way for the final disposal of vanadium hazardous wastes

  12. Zachary-Fort Lauderdale pipeline construction and conversion project: final supplement to final environmental impact statement. Docket No. CP74-192

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-05-01

    This Final Supplement to the Final Environmental Impact Statement (Final Supplement) evaluates the economic, engineering, and environmental aspects of newly developed alternatives to an abandonment/conversion project proposed by Florida Gas Transmission Company (Florida Gas). It also updates the staff's previous FEIS and studies revisions to the original proposal. Wherever possible, the staff has adopted portions of its previous FEIS in lieu of reprinting portions of that analysis which require no change. 60 references, 8 figures, 35 tables.

  13. Leading trends in environmental regulation that affect energy development. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Steele, R V; Attaway, L D; Christerson, J A; Kikel, D A; Kuebler, J D; Lupatkin, B M; Liu, C S; Meyer, R; Peyton, T O; Sussin, M H

    1980-01-01

    Major environmental issues that are likely to affect the implementation of energy technologies between now and the year 2000 are identified and assessed. The energy technologies specifically addressed are: oil recovery and processing; gas recovery and processing; coal liquefaction; coal gasification (surface); in situ coal gasification; direct coal combustion; advanced power systems; magnetohydrodynamics; surface oil shale retorting; true and modified in situ oil shale retorting; geothermal energy; biomass energy conversion; and nuclear power (fission). Environmental analyses of these technologies included, in addition to the main processing steps, the complete fuel cycle from resource extraction to end use. A comprehensive survey of the environmental community (including environmental groups, researchers, and regulatory agencies) was carried out in parallel with an analysis of the technologies to identify important future environmental issues. Each of the final 20 issues selected by the project staff has the following common attributes: consensus of the environmental community that the issue is important; it is a likely candidate for future regulatory action; it deals with a major environmental aspect of energy development. The analyses of the 20 major issues address their environmental problem areas, current regulatory status, and the impact of future regulations. These analyses are followed by a quantitative assessment of the impact on energy costs and nationwide pollutant emissions of possible future regulations. This is accomplished by employing the Strategic Environmental Assessment System (SEAS) for a subset of the 20 major issues. The report concludes with a more general discussion of the impact of environmental regulatory action on energy development.

  14. 78 FR 32269 - Notice of Availability of the Final Environmental Impact Statement/Environmental Impact Report...

    Science.gov (United States)

    2013-05-29

    ..., state and local levels. While CDFW has participated in the development of this joint EIS/ EIR, the... alternatives on the human and physical environment, including, but not limited to, effects on biological... inspection at several libraries and government offices. A full list of locations where the final EIS/EIR is...

  15. Environmental Impact Statement. March 2011. Interim storage, encapsulation and final disposal of spent nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    2011-07-01

    An Environmental Impact Statement (EIS) shall be prepared and submitted along with applications for permissibility and a licence under the Environmental Code and a licence under the Nuclear Activities Act for new nuclear facilities. This Environmental Impact Statement has been prepared by Svensk Kaernbraenslehantering AB (the Swedish Nuclear Fuel and Waste Management Co, SKB) to be included in the licence applications for continued operation of Clab (central interim storage facility for spent nuclear fuel) in Simpevarp in Oskarshamn Municipality and construction and operation of facilities for encapsulation (integrated with Clab) and final disposal of spent nuclear fuel in Forsmark in Oesthammar Municipality

  16. Environmental Impact Statement. March 2011. Interim storage, encapsulation and final disposal of spent nuclear fuel

    International Nuclear Information System (INIS)

    2011-01-01

    An Environmental Impact Statement (EIS) shall be prepared and submitted along with applications for permissibility and a licence under the Environmental Code and a licence under the Nuclear Activities Act for new nuclear facilities. This Environmental Impact Statement has been prepared by Svensk Kaernbraenslehantering AB (the Swedish Nuclear Fuel and Waste Management Co, SKB) to be included in the licence applications for continued operation of Clab (central interim storage facility for spent nuclear fuel) in Simpevarp in Oskarshamn Municipality and construction and operation of facilities for encapsulation (integrated with Clab) and final disposal of spent nuclear fuel in Forsmark in Oesthammar Municipality

  17. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 4, Comments and Responses.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This volume of the Initial Northwest Power Act Power Sales Contracts Final Environmental Impact Statement (Final EIS) contains public comments addressing the Initial Northwest Power Act Power Sales Contracts Draft EIS, August 1990 and Bonneville Power Administration`s (BPA) responses. The Introduction provides information about the process BPA follows in addressing these comments. Part I contains a listing of the Alternative Actions evaluated in the Final EIS; Part II is organized by Alternatives and includes summaries of the comments and BPA responses; Part III provides copies of the original comments letters, and, for ease of identification, are coded in the margins according to the alternative(s) addressed.

  18. 77 FR 62256 - Notice of Availability of the Final Environmental Impact Statement for the Mount Hope Project...

    Science.gov (United States)

    2012-10-12

    ... of the Final Environmental Impact Statement for the Mount Hope Project, Eureka County, NE AGENCY... prepared a Final Environmental Impact Statement (EIS) for the Mount Hope Project and by this notice is... Register. ADDRESSES: Copies of the Mount Hope Project Final EIS are available at the Battle Mountain...

  19. 75 FR 30055 - Notice of Availability of the Final Environmental Impact Statement for the Graymont Western U.S...

    Science.gov (United States)

    2010-05-28

    ... Final EIS evaluated three alternatives: No Action, the Proposed Action, and Alternative A, Modified Pit... 252X; MTM78300] Notice of Availability of the Final Environmental Impact Statement for the Graymont... of 1969 and the Federal Land Policy and Management Act of 1976, a Final Environmental Impact...

  20. 76 FR 12096 - McCloud-Pit Project; Notice of Availability of the Final Environmental Impact Statement for the...

    Science.gov (United States)

    2011-03-04

    ... Project; Notice of Availability of the Final Environmental Impact Statement for the Mccloud-Pit... Pit Rivers in Shasta County, California and has prepared a final environmental impact statement (EIS... and the alternatives for relicensing the McCloud-Pit Project. The final EIS documents the views of...

  1. Determination of the potential implementation impact of 2016 ministry of environmental protection generic assessment criteria for potentially contaminated sites in China.

    Science.gov (United States)

    Cheng, Yuanyuan; Tang, Yu-Ting; Nathanail, C Paul

    2017-04-12

    The Ministry of Environmental Protection of China issued a 3rd draft edition of risk-based Generic Assessment Criteria (the MEP-GAC) in March 2016. Since these will be the first authoritative GAC in China, their implementation is likely to have a significant impact on China's growing contaminated land management sector. This study aims to determine the potential implementation impact of the MEP-GAC through an in-depth analysis of the management context, land use scenarios, health criteria values adopted and exposure pathways considered. The MEP-GAC have been proposed for two broad categories of land use scenarios for contaminated land risk assessment, and these two categories of land use scenarios need to be further delved, and a MEP-GAC for Chinese cultivated land scenario ought to be developed, to ensure human health protection of Chinese farmers. The MEP-GAC have adopted 10 -6 as the acceptable lifetime cancer risk, given the widespread extent and severe level of land contamination in China, consideration should be given to the decision on excess lifetime cancer risk of 10 -5 . During risk assessment process in practice, it is better to review the 20% TDI against local circumstances to determine their suitability before adopting it. The MEP-GAC are based on a SOM value of 1%, for regions with particularly high SOM, it might be necessary to develop regional GAC, due to SOM's significant impact on the GAC developed. An authoritative risk assessment model developed based on HJ25.3-2014 would help facilitate the DQRA process in practice. The MEP-GAC could better reflect the likely exposures of China's citizens due to vapour inhalation by using characteristics of Chinese exposure scenarios, including China-generic building stock, as inputs into the Johnson and Ettinger model as opposed to adoption of the US EPA parameters. The MEP-GAC once implemented will set the trajectory for the development of the investigation, assessment and remediation of land contamination

  2. Tank Waste Remediation System, Hanford Site, Richland, Washington. Final Environmental Impact Statement. Volume IV

    International Nuclear Information System (INIS)

    1996-08-01

    This document, Volume 4, describes the current safety concerns associated with the tank waste and analyzes the potential accidents and associated potential health effects that could occur under the alternatives included in this Tank Waste Remediation System (TWRS) Final Environmental Impact Statement (EIS) for the Hanford Site, Richland, Washington

  3. 75 FR 10308 - Fire Management Plan, Final Environmental Impact Statement, Record of Decision, Grand Canyon...

    Science.gov (United States)

    2010-03-05

    ... DEPARTMENT OF THE INTERIOR National Park Service Fire Management Plan, Final Environmental Impact... Statement for the Fire Management Plan, Grand Canyon National Park. SUMMARY: Pursuant to the National... the Record of Decision for the Fire Management Plan, Grand Canyon National Park, Arizona. On January...

  4. 77 FR 41774 - Notice of Final Environmental Assessment and Finding of No Significant Impact for the...

    Science.gov (United States)

    2012-07-16

    ... Resources Ecological resources would not be affected since the construction and demolition activities are on... for the Construction and Operation of a Radiological Work and Storage Building AGENCY: Department of...) announces the availability of a Final Environmental Assessment (EA) for construction and operation of a...

  5. 75 FR 49504 - Notice of Availability of Final Environmental Impact Statement for the Goethals Bridge...

    Science.gov (United States)

    2010-08-13

    ... Final Environmental Impact Statement for the Goethals Bridge Replacement Project AGENCY: Coast Guard... the 82-year old Goethals Bridge across the Arthur Kill between Staten Island, NY, and Elizabeth, NJ... proposed Goethals Bridge Replacement Project. DATES: The review period for the FEIS will close on September...

  6. 75 FR 51479 - Notice of Availability of the Final Environmental Impact Statement for the Chevron Energy...

    Science.gov (United States)

    2010-08-20

    ... Solutions/Solar Millennium Blythe Solar Power Plant and Proposed California Desert Conservation Area Plan... Proposed California Desert Conservation Area (CDCA) Plan Amendment/Final Environmental Impact Statement... impacts of the project on air quality, biological resources, cultural resources, water resources...

  7. 77 FR 2970 - Gibson Dam Hydroelectric Company, LLC, Montana; Notice of Availability of Final Environmental...

    Science.gov (United States)

    2012-01-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12478-003] Gibson Dam Hydroelectric Company, LLC, Montana; Notice of Availability of Final Environmental Assessment In accordance with... reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S...

  8. 76 FR 67178 - Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement...

    Science.gov (United States)

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2149-152] Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement for the Wells... application for license for the Wells Hydroelectric Project (FERC No. 2149), located on the Columbia River in...

  9. 76 FR 71967 - Jordan Hydroelectric Limited Partnership; Notice of Availability of Final Environmental Assessment

    Science.gov (United States)

    2011-11-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12740-003-VA] Jordan Hydroelectric Limited Partnership; Notice of Availability of Final Environmental Assessment In accordance with... application for an original license for the 3.0-megawatt (MW) Flannagan Hydroelectric Project located on the...

  10. 77 FR 26537 - Fairlawn Hydroelectric Company, LLC; Notice of Availability of Final Environmental Assessment

    Science.gov (United States)

    2012-05-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12715-003] Fairlawn Hydroelectric Company, LLC; Notice of Availability of Final Environmental Assessment In accordance with the... the proposed 14,000-kilowatt (kW) Jennings Randolph Hydroelectric Project located on the North Branch...

  11. 76 FR 70437 - Jordan Hydroelectric Limited Partnership; Notice of Availability of Final Environmental Assessment

    Science.gov (United States)

    2011-11-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 12737-002] Jordan Hydroelectric Limited Partnership; Notice of Availability of Final Environmental Assessment In accordance with... original license for the 3.7-megawatt (MW) Gathright Hydroelectric Project located on the Jackson River in...

  12. 78 FR 12347 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Science.gov (United States)

    2013-02-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWYR05000 L16100000.DQ0000 LXSS04 K0000] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Lander Field Office Planning Area, WY AGENCY: Bureau of Land Management, Interior. ACTION...

  13. 76 FR 24050 - Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement, Biscayne National...

    Science.gov (United States)

    2011-04-29

    ... DEPARTMENT OF THE INTERIOR National Park Service [2310-0003-422] Coral Reef Restoration Plan... for the Coral Reef Restoration Plan, Biscayne National Park. SUMMARY: Pursuant to the National... availability of a Final Programmatic Environmental Impact Statement for the Coral Reef Restoration Plan (Plan...

  14. 76 FR 30942 - Notice of Availability of the Final Environmental Impact Statement for Improvements to the...

    Science.gov (United States)

    2011-05-27

    ... Calexico, California. The Final EIS provides GSA and its stakeholders an analysis of the environmental... Sheehan, NEPA Project Manager, Portfolio Management Division, Capital Investment Branch (9P2PTC), U.S.../nepalibrary . Dated: May 19, 2011. Samuel R. Mazzola, Director, Portfolio Management Division, Pacific Rim...

  15. 76 FR 77249 - Winter Use Plan, Final Environmental Impact Statement Record of Decision, Yellowstone National...

    Science.gov (United States)

    2011-12-12

    ... DEPARTMENT OF THE INTERIOR National Park Service Winter Use Plan, Final Environmental Impact... Impact Statement for a Winter Use Plan, Yellowstone National Park. SUMMARY: Pursuant to Sec. 102(2)(C) of... Winter Use Plan for Yellowstone National Park, located in Idaho, Montana, and Wyoming. On December 5...

  16. 76 FR 9054 - Notice of Availability of Final Environmental Impact Statement for the AREVA Enrichment Services...

    Science.gov (United States)

    2011-02-16

    ... Statement for the AREVA Enrichment Services LLC Proposed Eagle Rock Enrichment Facility in Bonneville County... published the Final Environmental Impact Statement (EIS) for the AREVA Enrichment Services LLC (AES) Proposed Eagle Rock Enrichment Facility (EREF). On December 30, 2008, AES submitted a license application...

  17. Columbia River system operation review. Final environmental impact statement. Appendix J, recreation

    International Nuclear Information System (INIS)

    1995-11-01

    This Appendix J of the Final Environmental Impact Statement for the Columbia River System discusses impacts on the recreational activities in the region. Major sections include the following: scope and processes; recreation in the Columbia River Basin today - by type, location, participation, user characteristics, factors which affect usage, and managing agencies; recreation analysis procedures and methodology; and alternatives and their impacts

  18. 77 FR 71446 - Notice of Availability of the Final Environmental Impact Statement for the West Chocolate...

    Science.gov (United States)

    2012-11-30

    ... telecommunications device for the deaf (TDD) may call the Federal Information Relay Service (FIRS) at 1-800-877-8339... geothermal energy testing and development. The Final EIS also analyzes the potential environmental impacts of... facilitate appropriate development of geothermal, solar, and wind energy in the REEA and make land use plan...

  19. 77 FR 46516 - Notice of Availability of the Final Environmental Impact Statement, Including a Programmatic...

    Science.gov (United States)

    2012-08-03

    ... Impact Statement, Including a Programmatic Agreement, for the Clark, Lincoln, and White Pine Counties...) has prepared a Final Environmental Impact Statement (EIS) and a Programmatic Agreement (PA), which is.... 100 N., Nephi Beaver Library, 55 W. Center St., Beaver FOR FURTHER INFORMATION CONTACT: Penny Woods...

  20. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix J: Recreation.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    This Appendix J of the Final Environmental Impact Statement for the Columbia River System discusses impacts on the recreational activities in the region. Major sections include the following: scope and processes; recreation in the Columbia River Basin today - by type, location, participation, user characteristics, factors which affect usage, and managing agencies; recreation analysis procedures and methodology; and alternatives and their impacts.

  1. 77 FR 74865 - Notice of Availability of the Final Environmental Impact Statement for the Searchlight Wind...

    Science.gov (United States)

    2012-12-18

    ... of pad mounted transformers at the base of each turbine, underground collection lines, new access....241A; 13-08807; MO 450004530; TAS: 14X5017] Notice of Availability of the Final Environmental Impact Statement for the Searchlight Wind Energy Project, Clark County, NV AGENCY: Bureau of Land Management...

  2. Final environmental impact statement. Management of commercially generated radioactive waste. Volume 1 of 3

    Energy Technology Data Exchange (ETDEWEB)

    1980-10-01

    This EIS analyzes the significant environmental impacts that could occur if various technologies for management and disposal of high-level and transuranic wastes from commercial nuclear power reactors were to be developed and implemented. This EIS will serve as the environmental input for the decision on which technology, or technologies, will be emphasized in further research and development activities in the commercial waste management program. The action proposed in this EIS is to (1) adopt a national strategy to develop mined geologic repositories for disposal of commercially generated high-level and transuranic radioactive waste (while continuing to examine subseabed and very deep hole disposal as potential backup technologies) and (2) conduct a R and D program to develop such facilities and the necessary technology to ensure the safe long-term containment and isolation of these wastes. The Department has considered in this statement: development of conventionally mined deep geologic repositories for disposal of spent fuel from nuclear power reactors and/or radioactive fuel reprocessing wastes; balanced development of several alternative disposal methods; and no waste disposal action. This EIS reflects the public review of and comments offered on the draft statement. Included are descriptions of the characteristics of nuclear waste, the alternative disposal methods under consideration, and potential environmental impacts and costs of implementing these methods. Because of the programmatic nature of this document and the preliminary nature of certain design elements assumed in assessing the environmental consequences of the various alternatives, this study has been based on generic, rather than specific, systems. At such time as specific facilities are identified for particular sites, statements addressing site-specific aspects will be prepared for public review and comment.

  3. Final environmental impact statement. Management of commercially generated radioactive waste. Volume 1 of 3

    International Nuclear Information System (INIS)

    1980-10-01

    This EIS analyzes the significant environmental impacts that could occur if various technologies for management and disposal of high-level and transuranic wastes from commercial nuclear power reactors were to be developed and implemented. This EIS will serve as the environmental input for the decision on which technology, or technologies, will be emphasized in further research and development activities in the commercial waste management program. The action proposed in this EIS is to (1) adopt a national strategy to develop mined geologic repositories for disposal of commercially generated high-level and transuranic radioactive waste (while continuing to examine subseabed and very deep hole disposal as potential backup technologies) and (2) conduct a R and D program to develop such facilities and the necessary technology to ensure the safe long-term containment and isolation of these wastes. The Department has considered in this statement: development of conventionally mined deep geologic repositories for disposal of spent fuel from nuclear power reactors and/or radioactive fuel reprocessing wastes; balanced development of several alternative disposal methods; and no waste disposal action. This EIS reflects the public review of and comments offered on the draft statement. Included are descriptions of the characteristics of nuclear waste, the alternative disposal methods under consideration, and potential environmental impacts and costs of implementing these methods. Because of the programmatic nature of this document and the preliminary nature of certain design elements assumed in assessing the environmental consequences of the various alternatives, this study has been based on generic, rather than specific, systems. At such time as specific facilities are identified for particular sites, statements addressing site-specific aspects will be prepared for public review and comment

  4. 2004 Power marketing program. Final environmental impact statement. Volume 1 - summary and environmental analysis

    International Nuclear Information System (INIS)

    1997-02-01

    The Sierra Nevada Region proposes to develop a plan to allocate power within its marketing areas of California and Nevada. Five alternatives were analyzed based on the possible range of operations of the Central Valley Project (CVP) hydroelectric system, levels of power purchases, and customer group allocations. Scheduling of the hydropower generating plants is the key difference across the alternatives. The peaking, preferred, renewables, and no-action alternatives are based on scheduling to emphasize peaking power. The baseload alternative assumes steady water releases. The analysis found no significant impacts overall. However, peaking operations tend to result in the greatest benefits and least negative effects to resources where impacts could be quantified. The peaking alternative was selected as the environmentally preferred alternative. The peaking alternative would add up to 317 MW of load-carrying capacity during August compared to taking no action. The preferred alternative results in up to a 262-MW gain and the baseload alternative results in a loss of 581 MW in comparison to the no-action alternative. Although it is not possible to determine where or when any lost capacity would be made up, building replacement capacity would result in land-use impacts and the use of natural and financial resources. The baseload alternative would result in more stable pool fluctuation within regulating reservoirs, which may benefit resident fish, recreation, and cultural resources; but these effects would be minor and could not be quantified. Environmental impacts within the CVP are limited to fluctuations in the regulating reservoirs. Changes in allocations to customer groups result in negligible regional economic effects. The renewables alternative is similar in CVP operation to the peaking alternative and melds 50 MW of renewables with CVP hydropower. Its environmental impacts vary, depending on the presence of biomass in the resource mix. 84 refs., 44 figs., 27 tabs

  5. South African patient's acceptance of generic drugs

    African Journals Online (AJOL)

    mechanism in this regard for final consumers, insurance providers, and ... facilities are viewed as inferior, treated with sus- picion and ... to choose a generic drug if the decision was supported by their doctor ... The effect of brand to generic and ...

  6. Technical approach to finalizing sensible soil cleanup levels at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Carr, D.; Hertel, B.; Jewett, M.; Janke, R.; Conner, B.

    1996-01-01

    The remedial strategy for addressing contaminated environmental media was recently finalized for the US Department of Energy's (DOE) Fernald Environmental Management Project (FEMP) following almost 10 years of detailed technical analysis. The FEMP represents one of the first major nuclear facilities to successfully complete the Remedial Investigation/Feasibility Study (RI/FS) phase of the environmental restoration process. A critical element of this success was the establishment of sensible cleanup levels for contaminated soil and groundwater both on and off the FEMP property. These cleanup levels were derived based upon a strict application of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) regulations and guidance, coupled with positive input from the regulatory agencies and the local community regarding projected future land uses for the site. The approach for establishing the cleanup levels was based upon a Feasibility Study (FS) strategy that examined a bounding range of viable future land uses for the site. Within each land use, the cost and technical implications of a range of health-protective cleanup levels for the environmental media were analyzed. Technical considerations in driving these cleanup levels included: direct exposure routes to viable human receptors; cross- media impacts to air, surface water, and groundwater; technical practicality of attaining the levels; volume of affected media; impact to sensitive environmental receptors or ecosystems; and cost. This paper will discuss the technical approach used to support the finalization of the cleanup levels for the site. The final cleanup levels provide the last remaining significant piece to the puzzle of establishing a final site-wide remedial strategy for the FEMP, and positions the facility for the expedient completion of site-wide remedial activities

  7. Environmental effects of exploratory drilling offshore Canada : environmental effects monitoring data and literature review : final report

    International Nuclear Information System (INIS)

    Hurley, G.; Ellis, J.

    2004-10-01

    This study examined pertinent environmental effects monitoring (EEM) information and data associated with offshore exploratory and development drilling in Canada. Two approaches were used: (1) a review of scientific literature was conducted to provide a synthesis of knowledge concerning interactions between exploratory drilling and the environment; and (2) a review of pertinent Canadian EEM data was conducted to evaluate interactions between exploratory drilling and the environment. Virtually all the east coast Canadian data reviewed in the study related to the effects of multiple wells. Although the effects of drilling waste were a primary focus, the effects of accidental discharges, lights and flaring, atmospheric emissions and noise emissions were also considered. Changes in the diversity and abundance of benthic organisms were detected within 1000 metres of many drill sites. The fine particles in drilling wastes contributed to the environmental effects observed around drilling platforms, and elevated body burden concentrations of drill waste indicators were detected over larger scales in a wide range of taxonomic groups. The results of laboratory and field studies suggested a lower potential for toxicity on commercial finfish and shellfish species. However, it was observed that measuring the effects of elevated concentrations of contaminants remained a challenge due to high levels variability in literature studies. A precautionary approach to the management of seismic surveys was recommended. It was concluded that the potential cumulative impacts of exploration drilling should be considered in the context of other anthropogenic activities. 138 refs., 6 tabs.

  8. Multifactorial effects of ambient temperature, precipitation, farm management, and environmental factors determine the level of generic Escherichia coli contamination on preharvested spinach.

    Science.gov (United States)

    Park, Sangshin; Navratil, Sarah; Gregory, Ashley; Bauer, Arin; Srinath, Indumathi; Szonyi, Barbara; Nightingale, Kendra; Anciso, Juan; Jun, Mikyoung; Han, Daikwon; Lawhon, Sara; Ivanek, Renata

    2015-04-01

    A repeated cross-sectional study was conducted to identify farm management, environment, weather, and landscape factors that predict the count of generic Escherichia coli on spinach at the preharvest level. E. coli was enumerated for 955 spinach samples collected on 12 farms in Texas and Colorado between 2010 and 2012. Farm management and environmental characteristics were surveyed using a questionnaire. Weather and landscape data were obtained from National Resources Information databases. A two-part mixed-effect negative binomial hurdle model, consisting of a logistic and zero-truncated negative binomial part with farm and date as random effects, was used to identify factors affecting E. coli counts on spinach. Results indicated that the odds of a contamination event (non-zero versus zero counts) vary by state (odds ratio [OR] = 108.1). Odds of contamination decreased with implementation of hygiene practices (OR = 0.06) and increased with an increasing average precipitation amount (mm) in the past 29 days (OR = 3.5) and the application of manure (OR = 52.2). On contaminated spinach, E. coli counts increased with the average precipitation amount over the past 29 days. The relationship between E. coli count and the average maximum daily temperature over the 9 days prior to sampling followed a quadratic function with the highest bacterial count at around 24°C. These findings indicate that the odds of a contamination event in spinach are determined by farm management, environment, and weather factors. However, once the contamination event has occurred, the count of E. coli on spinach is determined by weather only. Copyright © 2015, American Society for Microbiology. All Rights Reserved.

  9. [Generic drugs: good or bad? Physician's knowledge of generic drugs and prescribing habits].

    Science.gov (United States)

    García, A J; Martos, F; Leiva, F; Sánchez de la Cuesta, F

    2003-01-01

    In this article we analyze the responses of 1220 Spanish physicians who participated in a survery about generic drugs. A previously validated questionnaire was sent to physicians through the Spanish Medical Councils of the different provinces. Four items were analyzed: what doctors know about generic drugs (knowledge); physicians' prescribing habits concerning these drugs (attitude and professional competence); how prescription of generic drugs effects pharmaceutical costs amd, finally, what doctors believe a generic drug should be. The influence of physician-related variables (age, type of contract, specialty, workload, etc.) on prescribing of generic drugs was also analyzed. In view of the results, we believe that to rationalize expenditure through and appropriate policy on generic drugs Spanish health authorities should offer more and better training and information (clear and independent) about what generic drugs are.

  10. Final Environmental Assessment for a Solar Power System at Davis-Monthan Air Force Tucson, Arizona

    Science.gov (United States)

    2009-09-01

    to the following factors depending on the corresponding years. Year 2005 through 2009: VOCE = .016 * Trips NOxE = .015 * Trips PM10E = .0022...Trips COE = .262 * Trips Year 2010 and beyond: VOCE = .012 * Trips NOxE = .013 * Trips PM10E = .0022 * Trips COE = .262 * Trips FINAL...ENVIRONMENTAL ASSESSMENT B-8 Solar Power System (SPS) at Davis-Monthan AFB To convert from pounds per day to tons per year: VOC (tons/yr) = VOCE * DPYII/2000

  11. Final Environmental Assessment for Rapid Attack Identification, Detection, and Reporting System - Block 10

    Science.gov (United States)

    2007-05-03

    Navassa Island, and Kingman Reef . 3 Through an agreement with the Republic of the Marshall Islands Government, US actions at USAKA are subject to...tripod (similar to the RE used at the Hosted Sites) 15 RAIDRS Block 10 Final Environmental Assessment Banana R ive r A t l an t i c...operations, wastewater treatment plants , fuel storage tanks, aircraft and ground vehicle refueling and maintenance operations, soil

  12. 40 CFR 721.2083 - Polysubstituted carbomonocyclic hydroxylamine (generic).

    Science.gov (United States)

    2010-07-01

    ... hydroxylamine (generic). 721.2083 Section 721.2083 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Specific Chemical Substances § 721.2083 Polysubstituted carbomonocyclic hydroxylamine (generic). (a... generically as a polysubstituted carbomonocyclic hydroxylamine (PMN P-97-878) is subject to reporting under...

  13. Final Environmental Statement related to the operation of Beaver Valley Power Station, Unit 2 (Docket No. 50-412)

    International Nuclear Information System (INIS)

    1985-09-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with Beaver Valley Power Station Unit 2 pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental benefits and costs, and concludes that the action called for is the issuance of an operating license for Beaver Valley Unit 2

  14. 75 FR 19991 - Notice of Availability of the Final Environmental Impact Statement for the UNEV Refined Liquid...

    Science.gov (United States)

    2010-04-16

    ...-82385] Notice of Availability of the Final Environmental Impact Statement for the UNEV Refined Liquid...) has prepared a Proposed Resource Management Plan Amendment (RMPA)/Final Environmental Impact Statement..., Tooele, Juab, Millard, Beaver, Iron, and Washington Counties in Utah; and Lincoln and Clark Counties in...

  15. 77 FR 61020 - Notice of Availability of Final Environmental Impact Statement for the Sigurd to Red Butte No. 2...

    Science.gov (United States)

    2012-10-05

    ...; UTU-83067] Notice of Availability of Final Environmental Impact Statement for the Sigurd to Red Butte... (BLM) has prepared a Final Environmental Impact Statement (EIS) for the Sigurd to Red Butte No. 2--345...; Utah School and Institutional Trust Lands Administration; Millard, Sevier, Beaver, Iron, and Washington...

  16. 78 FR 43224 - Notice of Availability of the Final Environmental Impact Statement for the Proposed Sun Valley to...

    Science.gov (United States)

    2013-07-19

    ....XXX; AZA35079] Notice of Availability of the Final Environmental Impact Statement for the Proposed Sun... Land Management (BLM) has prepared a Final Environmental Impact Statement (EIS) for the proposed Sun..., operate, and maintain a 500/230-kV overhead transmission line from the Sun Valley Substation to the Morgan...

  17. The generic article

    NARCIS (Netherlands)

    Farkas, D.F.; Swart, Henriëtte de

    2005-01-01

    We take a fresh look at the connection between genericity and (in)definiteness by reconsidering a long-standing puzzle concerning the relation between definiteness and genericity. We contrast English on the one hand and Romance languages and Hungarian on the other, focusing on generic sentences

  18. Regulatory analysis for amendments to regulations for the environmental review for renewal of nuclear power plant operating licenses. Final report

    International Nuclear Information System (INIS)

    1996-05-01

    This regulatory analysis provides the supporting information for a proposed rule that will amend the Nuclear Regulatory Commission's environmental review requirements for applications for renewal of nuclear power plant operating licenses. The objective of the proposed rulemaking is to improve regulatory efficiency by providing for the generic evaluation of certain environmental impacts associated with nuclear plant license renewal. After considering various options, the staff identified and analyzed two major alternatives. With Alternative A, the existing regulations would not be amended. This option requires that environmental reviews be performed under the existing regulations. Alternative B is to assess, on a generic basis, the environmental impacts of renewing the operating license of individual nuclear power plants, and define the issues that will need to be further analyzed on a case-by-case basis. In addition, Alternative B removes from NRC's review certain economics-related issues. The findings of this assessment are to be codified in 10 CFR 51. The staff has selected Alternative B as the preferred alternative

  19. Mitigation of social and environmental impacts resulting from final closure of uranium mines

    International Nuclear Information System (INIS)

    Cipriani, Moacir

    2002-11-01

    This thesis focus on the impact of uranium mines in Brazil. It is recent, in the order of the Brazilian mining, the concern with the impact of mining activities. The Federal Constitution of 1988 compels the miner to rehabilitate the degraded environment, in accordance with the technical solution demanded by the competent public agency, which makes use of a system of environmental norms conditioning the mining activity. However, the concern with the closure of mines is in an early stage, for whose achievement the public power still lacks of norms and regulations. The closure of the first uranium mining in Brazil assumes special meaning, because the possible environmental problems related to uranium mines are considered to be serious and the uranium industry is state owned. This thesis is divided in two sections. The first one describes the state of the art of the uranium industry and the rules and management practices regarding the final closure of uranium mining in Brazil and countries like Australia, Canada, USA and France, that have been selected on the basis of the following criteria: production, exportation, control of reserves and final consumption of uranium. In the second part, a case study of Pocos de Caldas mine is presented, with description of historical production, plant waste and the chemical treatment of the ore. This part also presents the research carried out since the beginning of the operations aiming to remedial actions, including the dismantling of surface structures, tailings reclamation, and ground-water restoration, following CNEN (Brazilian Nuclear Energy Commission) rules, as well as a survey of local press coverage of the impact of the industry. A final recommendation is made regarding a management model and strategies to mitigate social and environmental impacts resulting from final closure of the CIPC. (author)

  20. Dual axis radiographic hydrodynamic test facility. Final environmental impact statement, Volume 2: Public comments and responses

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    On May 12, 1995, the U.S. Department of Energy (DOE) issued the draft Dual Axis Radiographic Hydrodynamic Test Facility Environmental Impact Statement (DARHT EIS) for review by the State of New Mexico, Indian Tribes, local governments, other Federal agencies, and the general public. DOE invited comments on the accuracy and adequacy of the draft EIS and any other matters pertaining to their environmental reviews. The formal comment period ran for 45 days, to June 26, 1995, although DOE indicated that late comments would be considered to the extent possible. As part of the public comment process, DOE held two public hearings in Los Alamos and Santa Fe, New Mexico, on May 31 and June 1, 1995. In addition, DOE made the draft classified supplement to the DARHT EIS available for review by appropriately cleared individuals with a need to know the classified information. Reviewers of the classified material included the State of New Mexico, the U.S. Environmental Protection Agency, the Department of Defense, and certain Indian Tribes. Volume 2 of the final DARHT EIS contains three chapters. Chapter 1 includes a collective summary of the comments received and DOE`s response. Chapter 2 contains the full text of the public comments on the draft DARHT EIS received by DOE. Chapter 3 contains DOE`s responses to the public comments and an indication as to how the comments were considered in the final EIS.

  1. 77 FR 67345 - Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Clearwater...

    Science.gov (United States)

    2012-11-09

    ...The U.S. Army Corps of Engineers (Corps) in conjunction with the Sanitation Districts of Los Angeles County (Sanitation Districts) has completed a Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Clearwater Program. The Clearwater Program is a comprehensive planning effort undertaken by the Sanitation Districts for the Joint Outfall System, a regional wastewater management system serving approximately 4.8 million people in 73 cities and unincorporated areas in Los Angeles County. A major component of the Clearwater Program is the evaluation of alternatives for construction of a new ocean outfall and rehabilitation of the existing ocean outfalls. Both activities would entail discharge of dredged and fill material in waters of the United States, work in navigable waters of the United States, and the transport of dredged material for ocean disposal. These activities would require authorization from the Corps pursuant to Section 404 of the Clean Water Act, Section 10 of the Rivers and Harbors Act, and Section 103 of the Marine Protection, Research, and Sanctuaries Act, respectively. The Draft EIS/EIR was circulated for a 57-day review period from February 13, 2012 through April 10, 2012. The Corps and the Sanitation Districts reviewed and provided responses to 19 agency comments and 33 public comments in preparing the Final EIS/EIR. The Final EIS/EIR, including a Draft 404(b)(1) alternatives analysis, is available for a 31-day review period from November 9, 2012 through December 10, 2012. The document is accessible via the World- Wide Web at www.ClearwaterProgram.org. Alternatively, printed copies are available at the following locations: Sanitation Districts of Los Angeles County, 1955 Workman Mill Road, Whittier, California; Carson Regional Library, 151 East Carson Street, Carson, California; Los Angeles Public Library, San Pedro Branch, 931 South Gaffey Street, San Pedro, California; and Los Angeles Public Library, Wilmington

  2. Final report on the Project Research 'Assessment of Human Exposure to Environmental Radiation'

    International Nuclear Information System (INIS)

    1989-03-01

    This is the final report of the Project Research, 'Assessment of Human Exposure to Environmental Radiation', which has been conducted during the period 1983-1988. With the objective of assessing risk of environmental radioactivity to the population, the Project was divided into the following five research groups: (1) research for establishing calculation models and parameters in transfer of radionuclides from crop species through the human body; (2) research for analyzing transfer of radionuclides in the ocean and their contributions to exposure doses in the human body; (3) research for surveying accuracy of exposure models for the external body and respiratory organ and the influential factors; (4) research for determining uptake and biokinetics of radionuclides in the body; and (5) research for estimating and evaluating physical and physiological characteristics of reference Japanese man and the populaltion doses. Effluents from nuclear power plants and reprocessing plants were regarded as radionuclide sources in the water and atmosphere. (N.K.)

  3. Modeling of integrated environmental control systems for coal-fired power plants. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Rubin, E.S.; Salmento, J.S.; Frey, H.C.; Abu-Baker, A.; Berkenpas, M.

    1991-05-01

    The Integrated Environmental Control Model (IECM) was designed to permit the systematic evaluation of environmental control options for pulverized coal-fired (PC) power plants. Of special interest was the ability to compare the performance and cost of advanced pollution control systems to ``conventional`` technologies for the control of particulate, SO{sub 2} and NO{sub x}. Of importance also was the ability to consider pre-combustion, combustion and post-combustion control methods employed alone or in combination to meet tough air pollution emission standards. Finally, the ability to conduct probabilistic analyses is a unique capability of the IECM. Key results are characterized as distribution functions rather than as single deterministic values. (VC)

  4. Waste Isolation Pilot Plant disposal phase final supplemental environmental impact statement. Summary

    International Nuclear Information System (INIS)

    1997-09-01

    The purpose of the Waste Isolation Pilot Plant Disposal Final Supplemental Environmental Impact Statement (SEIS-II) is to provide information on environmental impacts regarding the Department of Energy''s (DOE) proposed disposal operations at WIPP. The Proposed Action describes the treatment and disposal of the Basic inventory of TRU waste over a 35-year period. The Action Alternatives proposed the treatment of the Basic Inventory and an Additional Inventory as well as the transportation of the treated waste to WIPP for disposal over a 150- to 190-year period. The three Action Alternatives include the treatment of TRU waste at consolidation sites to meet WIPP planning-basic Waste Acceptance Criteria, the thermal treatment of TRU waste to meet Land Disposal Restrictions, and the treatment of TRU waste by a shred and grout process. SEIS-II evaluates environmental impacts resulting from the various treatment options; the transportation of TRU waste to WIPP using truck, a combination of truck and regular rail service, and a combination of truck and dedicated rail service; and the disposal of this waste in the repository. Evaluated impacts include those to the general environment and to human health. Additional issues associated with the implementation of the alternatives are discussed to provide further understanding of the decisions to be reached and to provide the opportunity for public input on improving DOE''s Environmental Management Program

  5. WPPSS Nuclear Project No. 2: Final environmental statement (DOCKET No. 50-397)

    International Nuclear Information System (INIS)

    1981-12-01

    The proposed action is the issuance of an operating license to the Washington Public Power Supply System (WPPSS) for the startup and operation of the Washington Nuclear Project Number 2 (WNP-2) located on the Columbia River in Benton County, about 19 km (12 mi) north of Richland, Washington. The facility will employ a boiling water reactor to produce 3323 megawatts thermal (MWt). A steam turbine-generator will use this heat to provide a nominal gross electrical output of 1150 megawatts (MWe). The exhaust steam will be condensed by cooled water from six circular mechanical-draft cooling towers with water taken from and returned to the Columbia River. The information in this statement represents the second assessment of the environmental impact associated with the WNP-2 pursuant to the guidelines of the National Environmental Policy Act of 1969 (NEPA) and 10 CRF Part 51 of the Commission's Regulations. After receiving an application to construct this plant, the staff carried out a review of impacts that would occur during its construction and operation. That evaluation was issued as a Final Environmental Statement (construction phase). The construction of Unit 2 about 86% complete. The staff estimated a fuel-loading date of September 1983. In March 1977, the applicant applied for an operating license for the unit and submitted the required safety and environmental reports in support of the application. 20 figs., 19 tabs

  6. Columbia River System Operation Review : Final Environmental Impact Statement, Main Report Exhibits.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    This Volume is a part of the Final Environmental Impact Statement (EIS) for the Columbia River System. This volume contains technical exhibits of cultural resources and commentary on the (System Operation Review) SOR process. The Confederated Tribes of the Umatilla Indian Reservation comment is the majority of the material in the volume, in the Consultation Plan, Identification of trust resources; Criteria for the selection of a System Operating Strategy; comment on rights protection and implementation of Federal Trust responsibility; analysis of the draft EIS. Comment by other Native American Tribes and groups is also included: Confederated Tribes of the Colville Reservation; Kootenai Tribe of Idaho; Spokane Tribe of Indians; Coeur d` Alene tribe.

  7. Fuze Experimentation Facility and Fuze Industrial Facility (FEF/FIF) Construction. Final Environmental Assessment

    Science.gov (United States)

    2011-04-01

    1-9. R esources N ot C arried Forw ard for D etailed A nalysis Legend Environmental Justice Concerns c:::J Proposed Project Area No Concerns...11 FEF/FIF C onstruction Environm ental A ssessm ent Page 3-6 Eglin A ir Force B ase, FL Final Figure 3-1. W ater R esources A t or N...Ecological A ssociations and Biological R esources A t or N ear the Proposed A ction Location Ecological Association Flatwoods Landscaped!Urban c:J

  8. Columbia River system operation review: Final environmental impact statement. Main report exhibits

    International Nuclear Information System (INIS)

    1995-11-01

    This Volume is a part of the Final Environmental Impact Statement (EIS) for the Columbia River System. This volume contains technical exhibits of cultural resources and commentary on the (System Operation Review) SOR process. The Confederated Tribes of the Umatilla Indian Reservation comment is the majority of the material in the volume, in the Consultation Plan, Identification of trust resources; Criteria for the selection of a System Operating Strategy; comment on rights protection and implementation of Federal Trust responsibility; analysis of the draft EIS. Comment by other Native American Tribes and groups is also included: Confederated Tribes of the Colville Reservation; Kootenai Tribe of Idaho; Spokane Tribe of Indians; Coeur d' Alene tribe

  9. Waste Isolation Pilot Plant disposal phase final supplemental environmental impact statement. Volume 3: Comment response document

    International Nuclear Information System (INIS)

    1997-09-01

    The purpose of the Waste Isolation Pilot Plant Disposal Final Supplemental Environmental Impact Statement (SEIS-II) is to provide information on environmental impacts regarding the Department of Energy''s (DOE) proposed disposal operations at WIPP. The Proposed Action describes the treatment and disposal of the Basic inventory of TRU waste over a 35-year period. The Action Alternatives proposed the treatment of the Basic Inventory and an Additional Inventory as well as the transportation of the treated waste to WIPP for disposal over a 150- to 190-year period. The three Action Alternatives include the treatment of TRU waste at consolidation sites to meet WIPP planning-basic Waste Acceptance Criteria, the thermal treatment of TRU waste to meet Land Disposal Restrictions, and the treatment of TRU waste by a shred and grout process. SEIS-II evaluates environmental impacts resulting from the various treatment options; the transportation of TRU waste to WIPP using truck, a combination of truck and regular rail service, and a combination of truck and dedicated rail service; and the disposal of this waste in the repository. Evaluated impacts include those to the general environment and to human health. Additional issues associated with the implementation of the alternatives are discussed to provide further understanding of the decisions to be reached and to provide the opportunity for public input on improving DOE''s Environmental Management Program. This volume provides responses to public comments on the Draft SEIS-II. Comments are related to: Alternatives; TRU waste; DOE credibility; Editorial; Endorsement/opposition; Environmental justice; Facility accidents; Generator site operations; Health and safety; Legal and policy issues; NEPA process; WIPP facilities; WIPP waste isolation performance; Purpose and need; WIPP operations; Site characterization; Site selection; Socioeconomics; and Transportation

  10. Waste Isolation Pilot Plant disposal phase final supplemental environmental impact statement. Volume 2: Appendices

    International Nuclear Information System (INIS)

    1997-09-01

    The purpose of the Waste Isolation Pilot Plant Disposal Final Supplemental Environmental Impact Statement (SEIS-II) is to provide information on environmental impacts regarding the Department of Energy's (DOE) proposed disposal operations at WIPP. The Proposed Action describes the treatment and disposal of the Basic inventory of TRU waste over a 35-year period. The Action Alternatives proposed the treatment of the Basic Inventory and an Additional Inventory as well as the transportation of the treated waste to WIPP for disposal over a 150- to 190-year period. The three Action Alternatives include the treatment of TRU waste at consolidation sites to meet WIPP planning-basic Waste Acceptance Criteria, the thermal treatment of TRU waste to meet Land Disposal Restrictions, and the treatment of TRU waste by a shred and grout process. SEIS-II evaluates environmental impacts resulting from the various treatment options; the transportation of TRU waste to WIPP using truck, a combination of truck and regular rail service, and a combination of truck and dedicated rail service; and the disposal of this waste in the repository. Evaluated impacts include those to the general environment and to human health. Additional issues associated with the implementation of the alternatives are discussed to provide further understanding of the decisions to be reached and to provide the opportunity for public input on improving DOE's Environmental Management Program. This volume contains the following appendices: Waste inventory; Summary of the waste management programmatic environmental impact statement and its use in determining human health impacts at treatment sites; Air quality; Life-cycle costs and economic impacts; Transportation; Human health; Facility accidents; Long-term consequence analysis for proposed action and action alternatives; Long-term consequence analysis for no action alternative 2; and Updated estimates of the DOE's transuranic waste volumes

  11. Environmental assessment for final rule on nuclear power plant license renewal

    International Nuclear Information System (INIS)

    1991-12-01

    The Atomic Energy Act and Nuclear Regulatory Commission (NRC) regulations provide for the renewal of nuclear power plant operating licenses beyond their initial 40-year term. The Act and NRC regulations, however, do not specify the procedures, criteria, and standards that must be satisfied in order to renew a license. The NRC is promulgating a rule (10 CFR Part 54) to codify such requirements prior to the receipt of applications for license renewal. The NRC has assessed the possible environmental effects of promulgating requirements in 10 CFR Part 54 now rather than employing such requirements in an ad hoc manner in individual licensing actions. The final part 54 rule requires the development of information and analyses to identify aging problems of systems, structures, and components unique to license renewal that will be of concern during the period of extended operation and will not be controlled by existing effective programs. In general, licensee activities for license renewal may involve replacement, refurbishment, inspection, testing, or monitoring. Such actions will be generally be within the range of similar actions taken for plants during the initial operating term. These actions would be primarily confined within the plants with potential for only minor disruption to the environment. It is unlikely that these actions would change the operating conditions of plants in ways that would change the environmental effects already being experienced. Relicensing under existing regulations would also be primarily focused on aging degradation and would likely result in requirements similar to those that will result from relicensing under the final rule

  12. Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    2011-01-01

    Pursuant to the Mercury Export Ban Act of 2008 (P.L. 110-414), DOE was directed to designate a facility or facilities for the long-term management and storage of elemental mercury generated within the United States. Therefore, DOE has analyzed the storage of up to 10,000 metric tons (11,000 tons) of elemental mercury in a facility(ies) constructed and operated in accordance with the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (74 FR 31723). DOE prepared this Final Mercury Storage EIS in accordance with the National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 et seq.), the Council on Environmental Quality (CEQ) implementing regulations (40 CFR 1500–1508), and DOE’s NEPA implementing procedures (10 CFR 1021) to evaluate reasonable alternatives for a facility(ies) for the long-term management and storage of elemental mercury. This Final Mercury Storage EIS analyzes the potential environmental, human health, and socioeconomic impacts of elemental mercury storage at seven candidate locations: Grand Junction Disposal Site near Grand Junction, Colorado; Hanford Site near Richland, Washington; Hawthorne Army Depot near Hawthorne, Nevada; Idaho National Laboratory near Idaho Falls, Idaho; Kansas City Plant in Kansas City, Missouri; Savannah River Site near Aiken, South Carolina; and Waste Control Specialists, LLC, site near Andrews, Texas. As required by CEQ NEPA regulations, the No Action Alternative was also analyzed as a basis for comparison. DOE intends to decide (1) where to locate the elemental mercury storage facility(ies) and (2) whether to use existing buildings, new buildings, or a combination of existing and new buildings. DOE’s Preferred Alternative for the long-term management and storage of mercury is the Waste Control Specialists, LLC, site near Andrews, Texas.

  13. Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement Volume1

    Energy Technology Data Exchange (ETDEWEB)

    2011-01-01

    Pursuant to the Mercury Export Ban Act of 2008 (P.L. 110-414), DOE was directed to designate a facility or facilities for the long-term management and storage of elemental mercury generated within the United States. Therefore, DOE has analyzed the storage of up to 10,000 metric tons (11,000 tons) of elemental mercury in a facility(ies) constructed and operated in accordance with the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (74 FR 31723).DOE prepared this Final Mercury Storage EIS in accordance with the National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 et seq.), the Council on Environmental Quality (CEQ) implementing regulations (40 CFR 1500–1508), and DOE’s NEPA implementing procedures (10 CFR 1021) to evaluate reasonable alternatives for a facility(ies) for the long-term management and storage of elemental mercury. This Final Mercury Storage EIS analyzes the potential environmental, human health, and socioeconomic impacts of elemental mercury storage at seven candidate locations:Grand Junction Disposal Site near Grand Junction, Colorado; Hanford Site near Richland, Washington; Hawthorne Army Depot near Hawthorne, Nevada; Idaho National Laboratory near Idaho Falls, Idaho;Kansas City Plant in Kansas City, Missouri; Savannah River Site near Aiken, South Carolina; and Waste Control Specialists, LLC, site near Andrews, Texas. As required by CEQ NEPA regulations, the No Action Alternative was also analyzed as a basis for comparison. DOE intends to decide (1) where to locate the elemental mercury storage facility(ies) and (2) whether to use existing buildings, new buildings, or a combination of existing and new buildings. DOE’s Preferred Alternative for the long-term management and storage of mercury is the Waste Control Specialists, LLC, site near Andrews, Texas.

  14. Final Environmental Impact Statement (EIS) for the Space Nuclear Thermal Propulsion (SNTP) program

    Science.gov (United States)

    1991-09-01

    A program has been proposed to develop the technology and demonstrate the feasibility of a high-temperature particle bed reactor (PBR) propulsion system to be used to power an advanced second stage nuclear rocket engine. The purpose of this Final Environmental Impact Statement (FEIS) is to assess the potential environmental impacts of component development and testing, construction of ground test facilities, and ground testing. Major issues and goals of the program include the achievement and control of predicted nuclear power levels; the development of materials that can withstand the extremely high operating temperatures and hydrogen flow environments; and the reliable control of cryogenic hydrogen and hot gaseous hydrogen propellant. The testing process is designed to minimize radiation exposure to the environment. Environmental impact and mitigation planning are included for the following areas of concern: (1) Population and economy; (2) Land use and infrastructure; (3) Noise; (4) Cultural resources; (5) Safety (non-nuclear); (6) Waste; (7) Topography; (8) Geology; (9) Seismic activity; (10) Water resources; (11) Meteorology/Air quality; (12) Biological resources; (13) Radiological normal operations; (14) Radiological accidents; (15) Soils; and (16) Wildlife habitats.

  15. Final environmental impact statement, construction and operation of the Spallation Neutron Source. Volume 2

    International Nuclear Information System (INIS)

    1999-04-01

    DOE issued the ''Draft Environmental Impact Statement: Construction and Operation of the Spallation Neutron Source'' in December 1998. This document was made available for review by federal agencies; tribal governments; the state of Tennessee, New Mexico, Illinois, and New York; local governments; and the general public. DOE invited comments on the accuracy and adequacy of the DEIS and any other matters pertaining to environmental review of the document. The formal review and comment period extended from December 24, 1998 until February 8, 1999. DOE considered all comments submitted after the review and comment period. This appendix to the Final Environmental Impact Statement (FEIS) contains the 206 comments received and the DOE responses to these comments. It consists of four chapters. Chapter 1 provides an introduction to the contents of this appendix and discusses the general methodology DOE used for documenting, considering, and responding to the review comments on the DEIS. Chapter 2 summarizes the principal issues of public concern collectively reflected by the comments and presents DOE's responses to these issues. The full texts of the comments on the DEIS are presented in Chapter 3. Chapter 4 contains DOE's written responses to these comments and the locations of textual changes in the FEIS that were made in response to the comments

  16. Environmental Impact Analysis Process. Final Environmental Assessment Construction and Operation of Revised PACBAR III Radar Station Saipan, CNMI

    National Research Council Canada - National Science Library

    1987-01-01

    ...). Many project design features have already incorporated environmental concerns. In addition, discussions with Saipan environmental agencies have resulted in mitigation measures, which have been added to the design...

  17. Development of a technical concept for a generic final repository for heat-generating wastes and spent fuel elements in crystalline rock formations in Germany. Final report; Entwicklung eines technischen Konzeptes fuer ein generisches Endlager fuer waermeentwickelnde Abfaelle und ausgediente Brennelemente im Kristallingestein in Deutschland. Abschlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Bertrams, Niklas; Herold, Philipp; Herold, Maxi; Krone, Juergen; Lommerzheim, Andree; Prignitz, Sabine; Kuate, Eric Simo

    2017-09-15

    The research project concerning the development of a generic concept for final repositories in crystalline rock formations has identified three different concepts for long-term safe enclosure efficacy: (i) the KBS-3 concept as pursued in Sweden and Finland based on corrosion resistant copper containers and bentonite buffers in vertical bore holes; (ii) The concept of ''multiple enclosure efficient rock zones'', based on several spatially separated rock zones that allow the demonstration of efficient enclosure; (iii) the concept of a ''superposed enclosure efficient rock zone'', where a sedimentary coverage of the crystalline host rock (for instance clay or salt) shows enclosure efficacy. For each of these concepts a separate final repository concept was developed covering the construction of shafts, ramps and transport routes, the preparation of boreholes, and the backfilling and closure technology, the planning of mine buildings, ventilation, time and cost estimation.

  18. Positron--electron storage ring project: Stanford Linear Accelerator Center, Stanford, California. Final environmental statement

    International Nuclear Information System (INIS)

    1976-08-01

    A final environmental statement is given which was prepared in compliance with the National Environmental Policy Act to support the Energy Research and Development Administration project to design and construct the positron-electron colliding beam storage ring (PEP) facilities at the Stanford Linear Accelerator Center (SLAC). The PEP storage ring will be constructed underground adjacent to the existing two-mile long SLAC particle accelerator to utilize its beam. The ring will be about 700 meters in diameter, buried at depths of 20 to 100 feet, and located at the eastern extremity of the SLAC site. Positron and electron beams will collide in the storage ring to provide higher energies and hence higher particle velocities than have been heretofore achieved. Some of the energy from the collisions is transformed back into matter and produces a variety of particles of immense interest to physicists. The environmental impacts during the estimated two and one-half years construction period will consist of movement of an estimated 320,000 cubic yards of earth and the creation of some rubble, refuse, and dust and noise which will be kept to a practical minimum through planned construction procedures. The terrain will be restored to very nearly its original conditions. Normal operation of the storage ring facility will not produce significant adverse environmental effects different from operation of the existing facilities and the addition of one water cooling tower. No overall increase in SLAC staff is anticipated for operation of the facility. Alternatives to the proposed project that were considered include: termination, postponement, other locations and construction of a conventional high energy accelerator

  19. Bonneville Power Administration Transmission System Vegetation Management Program - Final Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2000-06-23

    Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from our electric facilities; (2) increase our program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This Final Environmental Impact Statement (FEIS) establishes Planning Steps for managing vegetation for specific projects (to be tiered to this Environmental Impact Statement (EIS)). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed manual, mechanical, herbicide, and biological. Also evaluated are 23 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, we consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides

  20. Efficient Generic Functional Programming

    NARCIS (Netherlands)

    Alimarine, A.; Smetsers, J.E.W.

    2005-01-01

    Generic functions are defined by induction on the structural representation of types. As a consequence, by defining just a single generic operation, one acquires this operation over any particular data type. An instance on a specific type is generated by interpretation of the type's structure. A

  1. Optimizing Generic Functions

    NARCIS (Netherlands)

    Alimarine, A.; Smetsers, J.E.W.

    2004-01-01

    Generic functions are defined by induction on the structural representation of types. As a consequence, by defining just a single generic operation, one acquires this operation over any particular type. An instance on a specific type is generated by interpretation of the type's structure. A direct

  2. 76 FR 70169 - Draft Supplement 2 to Final Environmental Statement Related to the Operation of Watts Bar Nuclear...

    Science.gov (United States)

    2011-11-10

    ... Environmental Statement Related to the Operation of Watts Bar Nuclear Plant, Unit 2; Tennessee Valley Authority... on NUREG-0498, ``Final Environmental Statement, Supplement 2, Related to the Operation of Watts Bar... the Nuclear Regulatory Commission. Stephen J. Campbell, Chief, Watts Bar Special Projects Branch...

  3. Environmental effects of marine energy development around the world. Annex IV Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Copping, Andrea; Hanna, Luke; Whiting, Johnathan; Geerlofs, Simon; Grear, Molly; Blake, Kara [Pacific Northwest National Laboratory, Richland, WA (United States); Coffey, Anna; Massaua, Meghan; Brown-Saracino, Jocelyn; Battey, Hoyt [US Dept. of Energy, Washington, DC (United States)

    2013-01-15

    Annex IV is an international collaborative project to examine the environmental effects of marine energy devices among countries through the International Energy Agency’s Ocean Energy Systems Initiative (OES). The U.S. Department of Energy (DOE) serves as the Operating Agent for the Annex, in partnership with the Bureau of Ocean Energy Management (BOEM; formerly the Minerals Management Service), the Federal Energy Regulatory Commission (FERC), and National Oceanographic and Atmospheric Administration (NOAA). Numerous ocean energy technologies and devices are being developed around the world, and the few data that exist about the environmental effects of these technologies are dispersed among countries and developers. The purpose of Annex IV is to facilitate efficient government oversight of the development of ocean energy systems by compiling and disseminating information about the potential environmental effects of marine energy technologies and to identify methods of monitoring for these effects. Beginning in 2010, this three-year effort produced a publicly available searchable online database of environmental effects information (Tethys). It houses scientific literature pertaining to the environmental effects of marine energy systems, as well as metadata on international ocean energy projects and research studies. Two experts’ workshops were held in Dublin, Ireland (September 2010 and October 2012) to engage with international researchers, developers, and regulators on the scope and outcomes of the Annex IV project. Metadata and information stored in the Tethys database and feedback obtained from the two experts’ workshops were used as resources in the development of this report. This Annex IV final report contains three case studies of specific interactions of marine energy devices with the marine environment that survey, compile, and analyze the best available information in one coherent location. These case studies address 1) the physical interactions

  4. 78 FR 25973 - Final Environmental Impact Statement for the Real Property Master Plan at the Presidio of...

    Science.gov (United States)

    2013-05-03

    ... to improve the learning environment and quality of life at the POM installation. The Final EIS... are also planned to Leadership in Energy and Environmental Design standards to conserve resources. The... the Chamberlain Library on the OMC. An electronic version of the Final EIS can be viewed or downloaded...

  5. Generic impact statement for commercial radioactive waste management

    International Nuclear Information System (INIS)

    Unruh, C.M.

    1976-01-01

    ERDA is preparing a generic environmental impact statement on the treatment and disposal of waste resulting from commercial reactors and post fission operations in the light water reactor (LWR) fuel cycle. Expert contributions will be provided by many of the ERDA national laboratories and contractors. The waste management aspects of the statement will be based on available technology as presented in the recently issued ''Alternatives for Managing Waste from Reactors and Post Fission Operations in the LWR Fuel Cycle,'' ERDA-76-43 Document. This 1500 page, five volume Technical Alternative Document (TAD) describes the status of technology (to September, 1975) for handling post fission radioactive waste generated by the production of electricity by nuclear power light water reactor-generator systems. The statement will be generic in nature discussing typical or hypothetical facilities in typical or hypothetical environments. It is not intended to replace environmental statements required in support of specific projects nor for Nuclear Regulatory Commission licensing procedures. A major purpose of the generic statement is to inform the public and to solicit comments on the ERDA program for: (1) the final disposition of commercial radioactive waste, (2) waste treatment, (3) waste interim storage, and (4) transportation of waste. The statement will discuss the ERDA contingency program to provide retrievable storage of such waste if they should be transferred to Federal custody prior to the availability of the geologic isolation facilities for terminal disposal. The generic statement will not address radioactive waste resulting from U.S. Defense Programs, the mining or milling of uranium, the management of waste from the breeder reactor program, waste from other nations, nor will it include an evaluation of the impact of waste resulting from power sources other than light water reactors

  6. Tank Waste Remediation System, Hanford Site, Richland, Washington. Final Environmental Impact Statement. Volume VI

    International Nuclear Information System (INIS)

    1996-08-01

    The U.S. Department Of Energy and the Washington State Department of Ecology added Appendix L (Volume 6), Response to Public Comments, to the Tank Waste Remediation System (TWRS) Final Environmental Impact Statement (EIS) for the Hanford Site, Richland, Washington, to fully address and respond to public comments on the Draft EIS. In addition, DOE considered public comments, along with other factors such as programmatic need, short- and long-term impacts, technical feasibility, and cost, in arriving at DOE's preferred alternative. During the public comment period for the Draft EIS, more than 350 individuals, agencies, Tribal Nations, and organizations provided comments. This volume represents a broad spectrum of private citizens; businesses; local, State, and Federal officials; Tribal Nations; and public interest groups

  7. Radiological and environmental consequences. Final report of the Nordic Nuclear Safety Research project BOK-2

    International Nuclear Information System (INIS)

    Palsson, S.E.

    2002-11-01

    Final report of the Nordic Nuclear Safety Research project BOK-2, Radiological and Environmental Consequences. The project was carried out 1998-2001 with participants from all the Nordic countries. Representatives from the Baltic States were also invited to some of the meetings and seminars. The project consisted of work on terrestrial and marine radioecology and had a broad scope in order to enable participation of research groups with various fields of interest. This report focuses on the project itself and gives a general summary of the studies undertaken. A separate technical report summarises the work done by each research group and gives references to papers published in scientific journals. The topics in BOK-2 included improving assessment of old and recent fallout, use of radionuclides as tracers in Nordic marine areas, improving assessment of internal doses and use of mass spectrometry in radioecology. (au)

  8. Columbia River System Operation Review final environmental impact statement. Appendix T: Comments and responses

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. This appendix documents the public and agency review of the SOR Draft EIS and how the SOR agencies used the review to formulate the FINAL EIS. The appendix includes a summary of the review process, a discussion of the nature of the comments, a list of all commentors, reproductions of comment letters, and responses to all comments. Changes in the EIS text in response to comments are noted in the responses

  9. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix O: Economic and Social Impact.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    This Appendix O of the Final Environmental Impact Statement for the Columbia River System measures the economic and social effects of the alternative system operation strategies and includes both geographic and methodology components. Areas discussed in detail include the following: purpose, scope and process; an economic history of the Columbia River Basin and its use today including the Columbia River and Socio-economic development in the Northwest and Major uses of the River System; Analysis procedures and methodologies including national economic evaluation, the concepts, analysis of assumptions, analysis for specific river uses, water quality, Regional evaluation, analysis, and social impacts; alternatives and impacts including implementation costs, andromous fish, resident fish and wildlife, flood control, irrigation and municipal and industrial water supply, navigation impacts, power, recreation, annual costs, regional economic analysis. Extensive comparison of alternatives is included.

  10. Interim Columbia and Snake rivers flow improvement measures for salmon: Final Supplemental Environmental Impact Statement (SEIS)

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    Public comments are sought on this final SEIS, which supplements the 1992 Columbia River Salmon Flow Measures Options Analysis (OA)/Environmental Impact Statement (EIS). The Corps of Engineers, in cooperation with the Bonneville Power Administration and the Bureau of Reclamation proposes five alternatives to improve flows of water in the lower Columbia-Snake rivers in 1993 and future years to assist the migration of juvenile and adult anadromous fish past eight hydropower dams. These are: (1) Without Project (no action) Alternative, (2) the 1992 Operation, (3) the 1992 Operation with Libby/Hungry Horse Sensitivity, (4) a Modified 1992 Operation with Improvements to Salmon Flows from Dworshak, and (5) a Modified 1992 Operation with Upper Snake Sensitivity. Alternative 4, Modified 1992 Operations, has been identified as the preferred alternative.

  11. Columbia River system operation review: Final environmental impact statement. Appendix O, economic and social impact

    International Nuclear Information System (INIS)

    1995-11-01

    This Appendix O of the Final Environmental Impact Statement for the Columbia River System measures the economic and social effects of the alternative system operation strategies and includes both geographic and methodology components. Areas discussed in detail include the following: purpose, scope and process; an economic history of the Columbia River Basin and its use today including the Columbia River and Socio-economic development in the Northwest and Major uses of the River System; Analysis procedures and methodologies including national economic evaluation, the concepts, analysis of assumptions, analysis for specific river uses, water quality, Regional evaluation, analysis, and social impacts; alternatives and impacts including implementation costs, andromous fish, resident fish and wildlife, flood control, irrigation and municipal and industrial water supply, navigation impacts, power, recreation, annual costs, regional economic analysis. Extensive comparison of alternatives is included

  12. 76 FR 54525 - Notice of Availability of a Final Environmental Assessment (Final EA) and a Finding of No...

    Science.gov (United States)

    2011-09-01

    ... administrative space requirements and will be able to accommodate state-of-the-art equipment upgrades. The... fencing; replacement of the 8 element V-Ring antenna on the Runway 32R instrument landing system with a 14... the environmental analysis. Issued in Des Plaines, Illinois, on August 22, 2011. Virginia Marcks...

  13. 75 FR 9015 - Notice of Availability of a Final Environmental Assessment (Final EA) and a Finding of No...

    Science.gov (United States)

    2010-02-26

    ... construction and operation of a new ATCT at TVC. The replacement ATCT will be a Low Activity Level facility... operational characteristics. The existing antenna and shelter will be removed once the new equipment is... been used as guidance in the preparation of the environmental analysis. Issued in Des Plaines, Illinois...

  14. Environmental screening and evaluation of energy-using products (EuP). Final report

    Energy Technology Data Exchange (ETDEWEB)

    Wesnaes, M. (2.-0 LCA consultants ApS, Aalborg, (Denmark)); Thestrup, J. (In-JeT ApS, Birkeroed (Denmark)); Remmen, A. (Aalborg Univ., Aalborg (Denmark))

    2009-07-01

    , existing Ecolabelling and related regulations, market access and growth, technology trends, etc. The memorandum is structured so that overall conclusions and comments are provided first followed by a detailed description of each product group or cluster of product groups. Following this structure, chapter 2 provides an executive summary with the main conclusions and findings from the work performed up till now. Chapter 3 provides an overview of the methodology used in the environmental screening. Hereafter, chapters 4 through 19 provides the background data and individual conclusions for each product group or cluster of product groups. Finally, chapter 20 through 22 provides references to all the Preparatory Studies and other literature references. (LN)

  15. Final Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement Richland, Washington

    International Nuclear Information System (INIS)

    Collins, M.S.; Borgstrom, C.M.

    2004-01-01

    offsite facilities; and to certify TRU waste onsite using a combination of existing, upgraded, and mobile facilities. DOE issued the Notice of Intent to prepare the HSW EIS on October 27, 1997, and held public meetings during the scoping period that extended through January 30, 1998. In April 2002, DOE issued the initial draft of the EIS. During the public comment period that extended from May through August 2002, DOE received numerous comments from regulators, tribal nations, and other stakeholders. In March 2003, DOE issued a revised draft of the HSW EIS to address those comments, and to incorporate disposal of ILAW and other alternatives that had been under consideration since the first draft was published. Comments on the revised draft were received from April 11 through June 11, 2003. This final EIS responds to comments on the revised draft and includes updated analyses to incorporate information developed since the revised draft was published. DOE will publish the ROD(s) in the ''Federal Register'' no sooner than 30 days after publication of the Environmental Protection Agency's Notice of Availability of the final HSW EIS

  16. Tank Waste Remediation System, Hanford Site, Richland, Washington. Final Environmental Impact Statement. Volume I

    International Nuclear Information System (INIS)

    1996-08-01

    This document, Volume 1 of the Final Environmental Impact Statement, analyzes the potential environmental consequences related to the Hanford Site Tank Waste Remediation System (TWRS) alternatives for management and disposal of radioactive, hazardous, and mixed waste, and the management and disposal of approximately 1,930 cesium and strontium capsules located at the Hanford Site. This waste is currently or projected to be stored in 177 underground storage tanks and approximately 60 miscellaneous underground storage tanks. This document analyzes the following alternatives for remediating the tank waste: No Action, Long-Term Management, In Situ Fill and Cap, In Situ Vitrification, Ex Situ Intermediate Separations, Ex Situ No Separations, Ex Situ Extensive Separations, Ex Situ/In Situ Combination 1, and Ex Situ/In Situ Combination 2. This document also addresses a Phased Implementation alternative (the DOE and Ecology preferred alternative for remediation of tank waste). Alternatives analyzed for the cesium and strontium capsules include: No Action, Onsite Disposal, Overpack and Ship, and Vitrify with Tank Waste. The DOE and Ecology preferred alternative for the cesium and strontium capsules is the No Action alternative

  17. Study supporting the phasing out of environmentally harmful subsidies. Annexes to Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Withana, S.; Ten Brink, P.; Franckx, L.; Hirschnitz-Garbers, M.; Mayeres, I.; Oosterhuis, F.; Porsch, L.

    2012-10-15

    The need to reform ineffective or harmful public subsidies has long been recognised and has been a contentious point of discussion for several years. The EU has a long-standing commitment to removing or phasing out environmentally harmful subsidies (EHS). Most recently, the need to phase out EHS is reiterated in the 'Roadmap for a resource efficient Europe' which includes a milestone that 'by 2020 EHS will be phased out, with due regard to the impact on people in need'. Despite several commitments, progress has been slow and subsidies remain an issue in most EU countries. This study focuses specifically on EHS at the level of EU Member States; it identifies key types of EHS and examines cases of existing EHS across a range of environmental sectors and issues, including subsidies from non-action. The study also analyses examples of good practices in the reform of EHS in EU Member States and the lessons that can be learnt from these cases. Finally, based on this analysis, it develops practical recommendations on phasing out and reforming EHS to support the objectives of the Europe 2020 Strategy and the resource efficiency agenda. The study was carried out between January and October 2012 and is based on an analysis of literature and consultation with experts and policy makers. The sectoral cases studied are listed and discussed in this annex report: agriculture, climate and energy, fisheries, food, forestry, materials, transport, waste, and water.

  18. Final Hanford Comprehensive Land-Use Plan Environmental Impact Statement, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-10-01

    This Final ''Hanford Comprehensive Land-Use Plan Environmental Impact Statement'' (HCP EIS) is being used by the Department of Energy (DOE) and its nine cooperating and consulting agencies to develop a comprehensive land-use plan (CLUP) for the Hanford Site. The DOE will use the Final HCP EIS as a basis for a Record of Decision (ROD) on a CLUP for the Hanford Site. While development of the CLUP will be complete with release of the HCP EIS ROD, full implementation of the CLUP is expected to take at least 50 years. Implementation of the CLUP would begin a more detailed planning process for land-use and facility-use decisions at the Hanford Site. The DOE would use the CLUP to screen proposals. Eventually, management of Hanford Site areas would move toward the CLUP land-use goals. This CLUP process could take more than 50 years to fully achieve the land-use goals.

  19. Generic antibiotics in Japan.

    Science.gov (United States)

    Fujimura, Shigeru; Watanabe, Akira

    2012-08-01

    Generic drugs have been used extensively in many developed countries, although their use in Japan has been limited. Generic drugs reduce drug expenses and thereby national medical expenditure. Because generic drugs provide advantages for both public administration and consumers, it is expected that they will be more widely used in the future. However, the diffusion rate of generic drugs in Japan is quite low compared with that of other developed countries. An investigation on generic drugs conducted by the Ministry of Health, Labour and Welfare in Japan revealed that 17.2 % of doctors and 37.2 % of patients had not used generic drugs. The major reasons for this low use rate included distrust of off-patent products and lower drug price margin compared with the brand name drug. The generic drugs available in the market include external drugs such as wet packs, antihypertensive agents, analgesics, anticancer drugs, and antibiotics. Among them, antibiotics are frequently used in cases of acute infectious diseases. When the treatment of these infections is delayed, the infection might be aggravated rapidly. The pharmacokinetics-pharmacodynamics (PK-PD) theory has been adopted in recent chemotherapy, and in many cases, the most appropriate dosage and administration of antibiotics are determined for individual patients considering renal function; high-dosage antibiotics are used preferably for a short duration. Therefore, a highly detailed antimicrobial agent is necessary. However, some of the generic antibiotics have less antibacterial potency or solubility than the brand name products. We showed that the potency of the generic products of vancomycin and teicoplanin is lower than that of the branded drugs by 14.6 % and 17.3 %, respectively. Furthermore, we confirmed that a generic meropenem drug for injection required about 82 s to solubilize in saline, whereas the brand product required only about 21 s. It was thought that the cause may be the difference in size of bulk

  20. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Appendix A: BP Exploration (Alaska) Inc. Final project description - Revision 1, March 27, 1997

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains Appendix A of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment. This document is the Northstar Development Project, Final Project Description, Revision 1 for BPXA Northstar Project

  1. Practicing the Generic (City)

    DEFF Research Database (Denmark)

    Hansen, Lone Koefoed

    2010-01-01

    Flanagan proposes that most locative media artworks neglect the particularities of spaces, their historical and political layers. Koolhaas, on the other hand, states that all urban areas are alike, that we are facing a global Generic City. The paper analyses digital media artist Esther Polak......’s NomadicMILK project in light of the generic and particular properties of space as laid out by Flanagan and Koolhaas in order to discuss the possible reconfiguring practices of locative media....

  2. Final environmental impact statement Kenetech/PacifiCorp Windpower Project Carbon County, Wyoming

    International Nuclear Information System (INIS)

    1995-08-01

    The Draft and Final Environmental Impact Statements (DEIS and FEIS) assess the environmental consequences of a proposed windpower energy development in Carbon County, Wyoming. This abbreviated FEIS revises and supplements the DEIS for the project and addresses comments expressed for the DEIS. The proposed project entails the erection of approximately 1,390 wind turbine generators and associated facilities (e.g., roads, substations, distribution and communications lines) by KENETECH Windpower, Inc. A 230-kV transmission line would be built by PacifiCorp, Inc. to connect a proposed substation on Foote Creek Rim near Arlington to the Miner's substation near Hanna. The proposed project would use standard procedures as currently employed by other right-of-way projects, plus additional project-specific and site-specific mitigation measures to ensure that project impacts are minimized on all important resources. Impacts to most resources would be negligible to moderate during the life-of-project. Potentially significant impacts from the project include avian mortality; declining avian populations; threatened, endangered, candidate, and/or state sensitive species mortality and/or habitat loss; disturbance to nearby residents due to noise; changes in visual resources; disturbance of important Native American traditional sites; changes in plant community species composition due to snow redistribution; displacement of big game due to windfarm operation; and loss of sage grouse nesting habitat. The proposed project could also have numerous beneficial impacts including increased revenues generated by taxes, increased employment, and benefits derived from using a nonpolluting resource for electric power generation

  3. Columbia River System Operation Review final environmental impact statement. Appendix Q: Regional forum

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The SOR is currently developing a System Operating Strategy (SOS) that will guide the physical operations of the Columbia River system. The SOR is also addressing the institutional arrangements that must be in place to make needed changes to the SOS in the future, or make interpretations of the strategy in the light of changing water conditions or river needs. For convenience, this future institutional arrangement is referred to as ''The Columbia River Regional Forum,'' or simply ''the Forum,'' even though the nature of this institution is still to be determined. This appendix and the Final Environmental Impact Statement (EIS) identify the Forum as an administrative process that will not result in impacts to the environment and will not require analysis in a NEPA context. The composition of and procedures followed by a decision making body cannot--in and of themselves--be used to predict a particular decision with definable impacts on the environment. Nevertheless, because of the relationship to the other SOR actions, the SOR lead agencies have prepared this Technical Appendix to provide opportunities for review and comment on the Forum alternatives

  4. Final Programmatic Environmental Impact Statement, Lake Darling Flood Control Project, Souris River, North Dakota and Final Feature Environmental Impact Statement, Velva Flood Control, Velva, North Dakota.

    Science.gov (United States)

    1983-11-01

    1500-1508) identify a process called "tiering" and define it as "...the coverage of general matters in broader environmental impact statements (such as...Mr. John Clouse Mr. C. R. Danks Sherwood, ND 58782 Rural Route Route 2 Foxholm, ND 58738 King’s Court Minot, ND 58701 Dr. A. B. Brudirk Mrs. Veronica

  5. Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 3: Appendices

    International Nuclear Information System (INIS)

    1995-11-01

    Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains Appendices A--I which contain the following: glossary/abbreviations; scoping report; structure coordinate summary; air quality; biological resources; geology; noise; visual contrast rating forms; and cultural resources

  6. Tank Waste Remediation System, Hanford Site, Richland, Washington. Final Environmental Impact Statement. Volume II

    International Nuclear Information System (INIS)

    1996-08-01

    This document, Volume 2, provides the inventory of waste addressed in this Final Environmental Impact Statement (EIS) for the Tank Waste Remediation System, Hanford Site, Richland, Washington. The inventories consist of waste from the following four groups: (1) Tank waste; (2) Cesium (Cs) and Strontium (Sr) capsules; (3) Inactive miscellaneous underground storage tanks (MUSTs); and (4) Anticipated future tank waste additions. The major component by volume of the overall waste is the tank waste inventory (including future tank waste additions). This component accounts for more than 99 percent of the total waste volume and approximately 70 percent of the radiological activity of the four waste groups identified previously. Tank waste data are available on a tank-by-tank basis, but the accuracy of these data is suspect because they primarily are based on historical records of transfers between tanks rather than statistically based sampling and analyses programs. However, while the inventory of any specific tank may be suspect, the overall inventory for all of the tanks combined is considered more accurate. The tank waste inventory data are provided as the estimated overall chemical masses and radioactivity levels for the single-shell tanks (SSTs) and double-shell tanks (DSTs). The tank waste inventory data are broken down into tank groupings or source areas that were developed for analyzing groundwater impacts

  7. Final environmental impact statement: US Spent Fuel Policy. Charge for spent fuel storage

    International Nuclear Information System (INIS)

    1980-05-01

    The United States Government policy relating to nuclear fuel reprocessing, which was announced by President Carter on April 7, 1977, provides for an indefinite deferral of reprocessing, and thus commits light water reactor (LWR) plants to a once-through fuel cycle during that indefinite period. In a subsequent action implementing that policy, the Department of Energy (DOE) on October 18, 1977 announced a spent fuel policy which would enable domestic, and on a selective basis, foreign utilities to deliver spent fuel to the US Government for interim storage and final geologic disposal, and pay the Government a fee for such services. This volume addresses itself to whether the fee charged for these services, by its level or its structure, would have any effect on the environmental impacts of implementing the Spent Fuel Policy itself. This volume thus analyzes the fee and various alternatives to determine the interaction between the fee and the degree of participation by domestic utilities and foreign countries in the proposed spent fuel program for implementing the Spent Fuel Policy. It also analyzes the effect, if any, of the fee on the growth of nuclear power

  8. Columbia River System Operation Review final environmental impact statement. Appendix I: Power

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. This appendix discusses the work performed by the SOR Power Work Group. The Power Work Group (PWG) had several major responsibilities: first, to determine the effects of each of the various system operating strategies (SOS) on the Northwest regional power system; second, given these effects, to determine what, if any, actions are required to meet forecasted regional energy consumption; and finally, to estimate the cost for serving the forecasted regional energy consumption. The Northwest regional power system consists of Federal and non-Federal hydroelectric power projects (hydropower or hydro projects) on the main stem of the Columbia and Snake Rivers, numerous smaller hydro projects on other river reaches, and a number of thermal plants (coal, nuclear and combustion turbines)

  9. Scripting XML with Generic Haskell

    NARCIS (Netherlands)

    Atanassow, F.; Clarke, D.; Jeuring, J.T.

    2003-01-01

    A generic program is written once and works on values of many data types. Generic Haskell is a recent extension of the functional programming language Haskell that supports generic programming. This paper discusses how Generic Haskell can be used to implement XML tools whose behaviour depends on

  10. Scripting XML with Generic Haskell

    NARCIS (Netherlands)

    Atanassow, F.; Clarke, D.; Jeuring, J.T.

    2007-01-01

    A generic program is written once and works on values of many data types. Generic Haskell is a recent extension of the functional programming language Haskell that supports generic programming. This paper discusses how Generic Haskell can be used to implement XML tools whose behaviour depends on

  11. Edgemont uranium mill decommissioning, Fall River County, South Dakota (adoption as a final environmental impact statement (EIS) of the Nuclear Regulatory Commission's final EIS of September 1982): final environmental impact statement

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    Decommissioning of the existing uranium milling facilities at Edgemont, South Dakota is proposed. In this adoption by the Tennessee Valley Authority of the Nuclear Regulatory Commission's final environmental impact statement on the decommissioning, no significant deviations from that statement are presented. The project would prevent human exposure to radioactive material emitted by the defunct mill and its ancillary facilities. Reclamation of mill and waste impoundment sites would ensure their future usefulness for wildlife habitat and other purposes. Grading operations could result in occasional particulate levels that exceed federal air quality standards. As much as 105 acre-feet of water could be removed from the Pahasapa Aquifer. Disturbance of soils at the sites would degrade the quality of these soils. Approximately 501 acres of land, including 30 acres of land to be used as haul roads, would be denuded; 86 acres of farmland within the disposal site would be lost. All aquatic communities in Cottonwood Creek would be destroyed during cleanup operations, although the creek would be repopulated. Winddown tailings would increase downwind radiation levels during decommissioning activities

  12. Automated analysis in generic groups

    Science.gov (United States)

    Fagerholm, Edvard

    This thesis studies automated methods for analyzing hardness assumptions in generic group models, following ideas of symbolic cryptography. We define a broad class of generic and symbolic group models for different settings---symmetric or asymmetric (leveled) k-linear groups --- and prove ''computational soundness'' theorems for the symbolic models. Based on this result, we formulate a master theorem that relates the hardness of an assumption to solving problems in polynomial algebra. We systematically analyze these problems identifying different classes of assumptions and obtain decidability and undecidability results. Then, we develop automated procedures for verifying the conditions of our master theorems, and thus the validity of hardness assumptions in generic group models. The concrete outcome is an automated tool, the Generic Group Analyzer, which takes as input the statement of an assumption, and outputs either a proof of its generic hardness or shows an algebraic attack against the assumption. Structure-preserving signatures are signature schemes defined over bilinear groups in which messages, public keys and signatures are group elements, and the verification algorithm consists of evaluating ''pairing-product equations''. Recent work on structure-preserving signatures studies optimality of these schemes in terms of the number of group elements needed in the verification key and the signature, and the number of pairing-product equations in the verification algorithm. While the size of keys and signatures is crucial for many applications, another aspect of performance is the time it takes to verify a signature. The most expensive operation during verification is the computation of pairings. However, the concrete number of pairings is not captured by the number of pairing-product equations considered in earlier work. We consider the question of what is the minimal number of pairing computations needed to verify structure-preserving signatures. We build an

  13. Final environmental statement for decommissioning Humboldt Bay Power Plant, Unit No. 3 (Docket No. 50-133)

    International Nuclear Information System (INIS)

    1987-04-01

    The Final Environmental Statement contains the assessment of the environmental impact associated with decommissioning the Humboldt Bay Power Plant Unit 3 pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. The proposed decommissioning would involve safe storage of the facility for about 30 years, after which the residual radioactivity would be removed so that the facility would be at levels of radioactivity acceptable for release of the facility to unrestricted access

  14. Generic phytosanitary irradiation treatments

    International Nuclear Information System (INIS)

    Hallman, Guy J.

    2012-01-01

    The history of the development of generic phytosanitary irradiation (PI) treatments is discussed beginning with its initial proposal in 1986. Generic PI treatments in use today are 150 Gy for all hosts of Tephritidae, 250 Gy for all arthropods on mango and papaya shipped from Australia to New Zealand, 300 Gy for all arthropods on mango shipped from Australia to Malaysia, 350 Gy for all arthropods on lychee shipped from Australia to New Zealand and 400 Gy for all hosts of insects other than pupae and adult Lepidoptera shipped to the United States. Efforts to develop additional generic PI treatments and reduce the dose for the 400 Gy treatment are ongoing with a broad based 5-year, 12-nation cooperative research project coordinated by the joint Food and Agricultural Organization/International Atomic Energy Agency Program on Nuclear Techniques in Food and Agriculture. Key groups identified for further development of generic PI treatments are Lepidoptera (eggs and larvae), mealybugs and scale insects. A dose of 250 Gy may suffice for these three groups plus others, such as thrips, weevils and whiteflies. - Highlights: ► The history of phytosanitary irradiation (PI) treatments is given. ► Generic PI treatments in use today are discussed. ► Suggestions for future research are presented. ► A dose of 250 Gy for most insects may suffice.

  15. 40 CFR 721.10151 - Modified styrene, divinylbenzene polymer (generic).

    Science.gov (United States)

    2010-07-01

    ... polymer (generic). 721.10151 Section 721.10151 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Specific Chemical Substances § 721.10151 Modified styrene, divinylbenzene polymer (generic). (a) Chemical... as modified styrene, divinylbenzene polymer (PMN P-07-642) is subject to reporting under this section...

  16. 40 CFR 721.10146 - Partially fluorinated condensation polymer (generic).

    Science.gov (United States)

    2010-07-01

    ... polymer (generic). 721.10146 Section 721.10146 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Specific Chemical Substances § 721.10146 Partially fluorinated condensation polymer (generic). (a) Chemical... as partially fluorinated condensation polymer (PMN P-07-87) is subject to reporting under this...

  17. Final Environmental Statement related to the operation of WPPSS Nuclear Project No. 3 (Docket No. 50-508)

    International Nuclear Information System (INIS)

    1985-05-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with the Washington Public Power System Nuclear Project No. 3 (WNP-3) pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental benefits and costs. Land use and terrestrial and aquatic resource impacts will be small. Operational impacts to historic and archeological sites will be negligible. The effects of routine operations, energy transmission and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. The net socioeconomic effects of the project will be beneficial

  18. Generic robot architecture

    Science.gov (United States)

    Bruemmer, David J [Idaho Falls, ID; Few, Douglas A [Idaho Falls, ID

    2010-09-21

    The present invention provides methods, computer readable media, and apparatuses for a generic robot architecture providing a framework that is easily portable to a variety of robot platforms and is configured to provide hardware abstractions, abstractions for generic robot attributes, environment abstractions, and robot behaviors. The generic robot architecture includes a hardware abstraction level and a robot abstraction level. The hardware abstraction level is configured for developing hardware abstractions that define, monitor, and control hardware modules available on a robot platform. The robot abstraction level is configured for defining robot attributes and provides a software framework for building robot behaviors from the robot attributes. Each of the robot attributes includes hardware information from at least one hardware abstraction. In addition, each robot attribute is configured to substantially isolate the robot behaviors from the at least one hardware abstraction.

  19. Final Environmental Impact Statement and Environmental Impact Report for continued operation of Lawrence Livermore National Laboratory and Sandia National Laboratories, Livermore

    International Nuclear Information System (INIS)

    1992-08-01

    This Environmental Impact Statement/Environmental Impact Report (EIS/EIR) is prepared pursuant to the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). This document analyzes the potential environmental impacts of the proposed action: continued operation, including near-term (within 5 to 10 years) proposed projects, of Lawrence Livermore National Laboratory (LLNL) and Sandia National Laboratories, Livermore (SNL, Livermore). Additionally, this document analyzes a no action alternative involving continuing operations at FY 1992 funding levels without further growth, a modification of operations alternative to reduce adverse environmental impacts of operations or facilities, and a shutdown and decommissioning alternative of UC discontinuing its management of LLNL after the current contract expires on September 30, 1992. This document assesses the environmental impacts of the Laboratories' operations on air and water quality, geological and ecological systems, occupational and public health risks, prehistoric and historic resources, endangered species, floodplains and wetlands, socioeconomic resources, hazardous waste management, site contamination, and other environmental issues. The EIS/EIR is divided into five volumes and two companion reports. This volume contains the Final EIS/EIR, which in part relies on the detailed information in the appendices, and comprehensively discusses the proposed action, the alternatives, and the existing conditions and impacts of the proposed action and the alternatives

  20. Final Environmental Impact Statement/Environmental Impact Report for continued operation of Lawrence Livermore National Laboratory and Sandia National Laboratories, Livermore

    International Nuclear Information System (INIS)

    1992-08-01

    This Environmental Impact Statement/Environmental Impact Report (EIS/EIR) is prepared pursuant to the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). This document analyzes the potential environmental impacts of the proposed action: continued operation, including near-term (within 5 to 10 years) proposed projects, of Lawrence Livermore National Laboratory (LLNL) and Sandia National Laboratories, Livermore (SNL, Livermore). Additionally, this document analyzes a no action alternative involving continuing operations at FY 1992 funding levels without further growth, a modification of operations alternative to reduce adverse environmental impacts of operations or facilities, and a shutdown and decommissioning alternative of UC discontinuing its management of LLNL after the current contract expires on September 30, 1992. This document assesses the environmental impacts of the Laboratories' operations on air and water quality, geological and ecological systems, occupational and public health risks, prehistoric and historic resources, endangered species, floodplains and wetlands, socioeconomic resources, hazardous waste management, site contamination, and other environmental issues. The EIS/EIR is divided into five volumes and two companion reports. This volume contains the Final EIS/EIR technical appendices which provide technical support for the analyses in Volume 1 and also provide additional information and references

  1. 78 FR 64003 - Notice of Availability of the Final Environmental Impact Statement for the Jump Creek, Succor...

    Science.gov (United States)

    2013-10-25

    ...] Notice of Availability of the Final Environmental Impact Statement for the Jump Creek, Succor Creek, and... Field Office Jump Creek, Succor Creek and Cow Creek Watersheds grazing permit renewal, and by this... in the Federal Register. ADDRESSES: Copies of the Jump Creek, Succor Creek and Cow Creek Watersheds...

  2. Asbestos-Containing Materials in Schools; Final Rule and Notice. Part III: Environmental Protection Agency. 40 CFR Part 763.

    Science.gov (United States)

    Federal Register, 1987

    1987-01-01

    The Environmental Protection Agency (EPA) has issued a final rule under the Toxic Substance Control Act (TSCA) to require all local education agencies (LEAs) to identify asbestos-containing materials in their school buildings and take appropriate action to control release of asbestos fibers. The LEAs are required to describe their activities in…

  3. 76 FR 47608 - Notice of Availability of the Final Environmental Impact Statement for the Rice Solar Energy, LLC...

    Science.gov (United States)

    2011-08-05

    ... Availability of the Final Environmental Impact Statement for the Rice Solar Energy, LLC Rice Solar Energy... Desert Conservation Area (CDCA) Plan Amendment for the Rice Solar Energy Project (RSEP) in Riverside... proposed Rice Solar Energy Project (Project) is a 150 megawatt (MW) solar electric power plant that would...

  4. 78 FR 50051 - Notice of Availability of the Final Environmental Impact Statement for the Tarmac King Road...

    Science.gov (United States)

    2013-08-16

    ... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers Notice of Availability of the Final Environmental Impact Statement for the Tarmac King Road Limestone Mine Proposed in Levy County... from limestone extraction, material stockpiling, roads, and other infrastructure over a period of...

  5. 75 FR 60804 - Notice of Availability of the Final Environmental Impact Statement for the West Butte Wind Power...

    Science.gov (United States)

    2010-10-01

    ... Wind Power Right-of-Way, Crook and Deschutes Counties, OR AGENCY: Bureau of Land Management, Interior... Final Environmental Impact Statement (EIS) for the West Butte Wind Power Right-of-Way and by this Notice... Register notice. FOR FURTHER INFORMATION CONTACT: Steve Storo, BLM West Butte Wind Power Right of Way...

  6. 77 FR 64543 - Notice of Availability of the Final Environmental Impact Statement for the Mount Hope Project...

    Science.gov (United States)

    2012-10-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLNVB01000 L51100000.GN0000.LVEMF12CF010 241A; NVN-082096; NVN-084632; NVN-091272; 12-08807; MO 4500039779; TAS: 14X5017] Notice of Availability of the Final Environmental Impact Statement for the Mount Hope Project, Eureka County, NV Correction...

  7. 75 FR 71730 - General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental...

    Science.gov (United States)

    2010-11-24

    ... management under alternative B would be to enable visitor participation in a wide variety of outdoor... DEPARTMENT OF THE INTERIOR National Park Service [2031-A046-409] General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental Impact Statement, Big Cypress National...

  8. 77 FR 76067 - Notice of Availability of a Proposed Land Use Plan Amendment and Final Environmental Impact...

    Science.gov (United States)

    2012-12-26

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA-051552, LLCAD0700 L51010000 FX0000 LVRWB10B3980] Notice of Availability of a Proposed Land Use Plan Amendment and Final Environmental Impact Statement for the Proposed McCoy Solar Energy Project, CA AGENCY: Bureau of Land Management, Interior...

  9. 78 FR 11672 - Notice of Availability of the Final Environmental Impact Statement for the Alta East Wind Project...

    Science.gov (United States)

    2013-02-19

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA-052537, LLCAD05000, L51010000.LVRWB11B4520.FX0000] Notice of Availability of the Final Environmental Impact Statement for the Alta East Wind Project, Kern County, CA, and Proposed Land Use Plan Amendment AGENCY: Bureau of Land Management, Interior...

  10. Resource contingency program - Oregon. Final environmental impact statement, Hermiston power project

    International Nuclear Information System (INIS)

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA's Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA's intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future

  11. Resource Contingency Program - Oregon : Final Environmental Impact Statement, Hermiston Power Project.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA`s Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA`s intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future.

  12. Columbia River system operation review: Final environmental impact statement. Appendix R, Pacific Northwest Coordination agreement (PNCA)

    International Nuclear Information System (INIS)

    1995-11-01

    Currently, the Federal government coordinates the planning and operation of the Federal Columbia River Power System (FCRPS) with projects owned and operated by the region's non-Federal hydrogenerating utilities pursuant to the Pacific North-west Coordination Agreement (PNCA). The Bureau of Reclamation (Reclamation), the Corps of Engineers (Corps), and the Bonneville Power Administration (BPA) are parties to the PNCA on behalf of the government of the United States. The PNCA is a complex agreement that provides an opportunity for the region's power producers to maximize the power system's reliability and economy while meeting their multiple-use objectives. The PNCA does not dictate the operation of the resources it coordinates. It is essentially an accounting mechanism that exchanges the power produced among the parties in order to improve the reliability of the system and reduce regional power costs. Project owners retain complete autonomy to operate as needed to meet their multiple-use requirements. The PNCA was executed in 1964 as an important component of regional plans to maximize the Northwest's hydro resource capability. Maximization also included the development of storage projects on the Columbia River in Canada pursuant to the terms of the 1964 Columbia River Treaty. Because of the link between power coordination and Treaty issues, the current parties to the PNCA, currently are contemplating entering into a replacement or renewed power coordination agreement. Because the power coordination agreement is a consensual arrangement, its ultimate provisions must be acceptable to all of its signatories. This Appendix R to the Final Environmental Impact Statement of the Columbia River System is a presentation of the Pacific North-west Coordination Agreement

  13. Final environmental statement related to operation of White Mesa Uranium Project, Energy Fuels Nuclear, Inc

    International Nuclear Information System (INIS)

    1979-05-01

    Environmental impact statements are presented under the following headings: the existing environment; mining and milling operations; air quality; land use; mineral resources; soils; radiological impacts; socioeconomic impacts; environmental effects of accidents; monitoring programs; unavoidable adverse environmental impacts; relation between short-term uses of the environment and long-term productivity; irreversible and irretrievable commitments

  14. 76 FR 71619 - Availability of the Final Environmental Assessment (EA) and Finding of No Significant Impact...

    Science.gov (United States)

    2011-11-18

    ... the National Environmental Policy Act (NEPA) of 1969, 42 United States Code Sec. 4321-4347 (as amended... during regular business hours at the following location: McGinley Memorial Library, 317 Main Street... environmental policies and objectives as set forth in Section 101 of NEPA and other applicable environmental...

  15. Integration of generic issues

    International Nuclear Information System (INIS)

    Thatcher, D.

    1989-01-01

    The NRC has recognized the need to integrate generic issues (GIs). The GI process includes a number of phases, all of which should recognize the potential for overlap and conflict among related issues. In addition to the issues themselves, other related NRC and industry programs and activities need to be factored into the GI process. Integration has taken place, or is taking place, for a number of GIs. Each case of integration involves a specific set of circumstances and, as a result, the way in which integration proceeds can vary. This paper discusses the integration of issues in the generic issue process and provides a number of examples

  16. Rethinking generic skills

    Directory of Open Access Journals (Sweden)

    Roy Canning

    2013-10-01

    Full Text Available The paper provides a critical analysis of the notion of generic or transversal skillscontained with European Union policy discourses. The author presents a conceptualframework that challenges the idea that generic skills are universal, transferable andautonomous. An alternative analysis is put forward that argues the case forcontextualising skills and knowledge within particular understandings and cultures thatare more collective than individualistic in nature. The arguments are framed withinwider cross-disciplinary debates in linguistics, geosemiotics and social-cultural theoryand build upon an earlier paper exploring core skills in the UK (Canning, 2007.

  17. Proposed Expansion of German Air Force Operations at Holloman AFB, New Mexico. Final Environmental Impact Statement. Volume III: Comment Letters and Responses to Comments

    National Research Council Canada - National Science Library

    1998-01-01

    The Final Environmental Impact Statement analyzed the potential environmental consequences from the proposal to beddown 30 additional German Air Force Tornado aircraft and 640 personnel at Holloman Air Force Base (AFB) New Mexico...

  18. Generic clearance values

    International Nuclear Information System (INIS)

    Bossio, M.C.; Muniz, C.C.

    2009-01-01

    This paper analyzes the Generic Clearance Values established for natural and artificial radionuclides with the objective of evaluating their degree of conservatism in views of adopting them into the regulatory body. Generic clearance values for natural radionuclides have been chosen by experts judgments as the optimum boundary between, on one hand, the ubiquitous unmodified soil concentrations and, on the other hand, activity concentrations in ores, mineral sands, industrial residues and wastes. For artificial radionuclides the clearance levels have been derived from the scenarios postulated in the document 'Safety Reports Series Nr 44' of the IAEA considering quantitative exemption criteria. A set of 8 scenarios were postulated covering external, ingestion and inhalation exposure pathways. For each radionuclide, the generic clearance level was derived as the more restrictive value obtained from the scenarios, that is the lowest ratio between the applicable individual dose and the dose per unit activity concentration (Bq/g). The individual dose was calculated by a formula depending on each scenario and pathway, with different parameters, such as exposure time, dosimetric factors, dilution factor, density of the material, geometric factors, etc. It was concluded that the basis and parameters used for the derivation of the generic clearance levels are quite conservative and therefore its the adoption in Argentina has been recommended. It is expected that their implementation will contribute to optimize the regulatory management system. (author)

  19. Generic Clearance Values

    International Nuclear Information System (INIS)

    Bossio, M.C.; Muniz, C.C.

    2010-01-01

    This paper analyzes the Generic Clearance Values established for natural and artificial radionuclides with the objective of evaluating their degree of conservatism in views of adopting them into the regulatory body. Generic clearance values for natural radionuclides have been chosen by experts judgments as the optimum boundary between, on the one hand, the ubiquitous unmodified soil concentrations and, on the other hand, activity concentrations in ores, mineral sands, industrial residues and wastes. For artificial radionuclides the clearance levels have been derived from the scenarios postulated in the document Safety Reports Series 44 of the IAEA considering quantitative exemption criteria. A set of 8 scenarios were postulated covering external, ingestion and inhalation exposure pathways. For each radionuclide, the generic clearance level was derived as the more restrictive value obtained from the scenarios, that is the lowest ratio between the applicable individual dose and the dose per unit activity concentration (Bq/g). The individual dose was calculated by a formula depending on each scenario and pathway, with different parameters, such as exposure time, dosimetric factors, dilution factor, density of the material, geometric factors, etc. It was concluded that the basis and parameters used for the derivation of the generic clearance levels are quite conservative and therefore its the adoption in Argentina has been recommended. It is expected that their implementation will contribute to optimize the regulatory management system. (authors) [es

  20. Generic phytosanitary irradiation treatments

    Science.gov (United States)

    Hallman, Guy J.

    2012-07-01

    The history of the development of generic phytosanitary irradiation (PI) treatments is discussed beginning with its initial proposal in 1986. Generic PI treatments in use today are 150 Gy for all hosts of Tephritidae, 250 Gy for all arthropods on mango and papaya shipped from Australia to New Zealand, 300 Gy for all arthropods on mango shipped from Australia to Malaysia, 350 Gy for all arthropods on lychee shipped from Australia to New Zealand and 400 Gy for all hosts of insects other than pupae and adult Lepidoptera shipped to the United States. Efforts to develop additional generic PI treatments and reduce the dose for the 400 Gy treatment are ongoing with a broad based 5-year, 12-nation cooperative research project coordinated by the joint Food and Agricultural Organization/International Atomic Energy Agency Program on Nuclear Techniques in Food and Agriculture. Key groups identified for further development of generic PI treatments are Lepidoptera (eggs and larvae), mealybugs and scale insects. A dose of 250 Gy may suffice for these three groups plus others, such as thrips, weevils and whiteflies.

  1. Generic phytosanitary irradiation treatments

    Energy Technology Data Exchange (ETDEWEB)

    Hallman, Guy J [United States Department of Agriculture, Agricultural Research Service, Weslaco, TX (United States)

    2013-01-15

    The history of the development of generic phytosanitary irradiation (PI) treatments is discussed beginning with its initial proposal in 1986. Generic PI treatments in use today are 150 Gy for all hosts of Tephritidae, 250 Gy for all arthropods on mango and papaya shipped from Australia to New Zealand, 300 Gy for all arthropods on mango shipped from Australia to Malaysia, 350 Gy for all arthropods on lychee shipped from Australia to New Zealand and 400 Gy for all hosts of insects other than pupae and adult Lepidoptera shipped to the United States. Efforts to develop additional generic PI treatments and reduce the dose for the 400 Gy treatment are ongoing with a broad based 5-year, 12-nation cooperative research project coordinated by the joint Food and Agricultural Organization/International Atomic Energy Agency Program on Nuclear Techniques in Food and Agriculture. Key groups identified for further development of generic PI treatments are Lepidoptera (eggs and larvae), mealybugs and scale insects. A dose of 250 Gy may suffice for these three groups plus others, such as thrips, weevils and whiteflies. (author)

  2. The generic strategy trap.

    Science.gov (United States)

    Miller, D

    1992-01-01

    Management experts claim that for a company to thrive, it must concentrate on a single generic strategy--on one thing it does better than its rivals. But specialization also has its disadvantages. The author suggests that a broader, mixed approach may be preferable.

  3. Final waste management programmatic environmental impact statement for managing treatment, storage, and disposl of radioactive and hazardous waste. Volume II

    International Nuclear Information System (INIS)

    1997-01-01

    The Final Waste Management Programmatic Environmental Impact Statement (WM PEIS) examines the potential environmental and cost impacts of strategic management alternatives for managing five types of radioactive and hazardous wastes that have resulted and will continue to result from nuclear defense and research activities at a variety of sites around the United States. The five waste types are low-level mixed waste, low-level waste, transuranic waste, high-level waste, and hazardous waste. The WM PEIS provides information on the impacts of various siting alternatives which the Department of Energy (DOE) will use to decide at which sites to locate additional treatment, storage, and disposal capacity for each waste type.Volume II is an integral part of the Office of Environmental Management''s (EM''s) Waste Management Programmatic Environmental Impact Statement (WM PEIS), which portrays the impacts of EM''s waste management activities at each of the 17 major DOE sites evaluated in the WM PEIS

  4. Prioritization of generic safety issues

    International Nuclear Information System (INIS)

    Emrit, R.; Minners, W.; VanderMolen, H.

    1983-12-01

    This report presents the priority rankings for generic safety issues related to nuclear power plants. The purpose of these rankings is to assist in the timely and efficient allocation of NRC resources for the resolution of those safety issues that have a significant potential for reducing risk. The report focuses on the prioritization of generic safety issues. Issues primarily concerned with the licensing process or environmental protection and not directly related to safety have been excluded from prioritization. The prioritized issues include: TMI Action Plan items under development; previously proposed issues covered by Task Action Plans, except issues designated at Unresolved Safety Issues (USIs) which had already been assigned high priority; and newly-proposed issues. Future supplements to this report will include the prioritization of additional issues. The safety priority rankings are HIGH, MEDIUM, LOW, and DROP and have been assigned on the basis of risk significance estimates, the ratio of risk to costs and other impacts estimated to result if resolutions of the safety issues were implemented, and the consideration of uncertainties and other quantitative or qualitative factors. To the extent practical, estimates are quantitative

  5. Background as a residual radioactivity criterion for decommissioning: Appendix A to the Generic Environmental Impact Statement in support of rulemaking on radiological criteria for decommissioning of NRC-licensed nuclear facilities. Draft report

    International Nuclear Information System (INIS)

    Huffert, A.M.; Meck, R.A.; Miller, K.M.

    1994-08-01

    This report was originally published as an appendix to the draft U.S. Nuclear Regulatory Commission (NRC) document entitled, open-quotes Generic Environmental Impact Statement in Support of Rulemaking on Radiological Criteria for Decommissioning of NRC-Licensed Nuclear Facilities.close quotes Because of the great interest in this report by members of the public, citizen and environmental organizations, academicians, licensees, and regulators, the NRC staff is publishing this report separately, so that it can be readily available to a diverse audience. This report was created to assist both the NRC staff and interested members of the public in evaluating background radiation (background) as a decommissioning criterion, by serving as a primer on background and providing information on the existing applications of background in regulatory criteria and standards. This report also discusses some of the methods available to measure and distinguish between the very low radiation levels associated with background and man-made sources of radiation. Two approaches are considered for applying background as a decommissioning criterion; these are the use of background dose rates and background radionuclide concentrations. This report concludes that the temporal and spatial variability of background produces a wide range of doses to United States residents, which prevents the application of background dose rates as a decommissioning criterion. Instead, this report recommends that local background radionuclide concentrations serve as a benchmark for decommissioning criteria, while taking into account the concept of reducing residual radioactivity to a level as low as is reasonably achievable

  6. Midland Plant, Units 1 and 2 (Docket Nos. 50-329 and 50-330): Draft supplement to the Final environmental statement

    International Nuclear Information System (INIS)

    1977-01-01

    The Midland Plant, Units 1 and 2 is to be owned and operated by the Consumers Power Company of Michigan. The approximately 1190-acre plant is on the south of the Tittabawassee River immediately across from the Dow Chemical Company's main industrial complex which is within the Midland city limits. The site itself was, and the area south of the site is, partially wooded flat land with farming the only economically significant human activity. To the east and north within one mile of the site, the land is industrial, both developed and undeveloped. To the west, the land is used for suburban residences and light farming. The plant will utilize two pressurized-water nuclear reactor systems. The Consumers Power Company filed with AEC (now NRC) an application for construction permits and operating licenses for the Midland Plant on January 13, 1969. The Final Environmental Statement was issued in March 1972 and on December 15, 1972 construction permits were issued for the Midland Plant. On July 21, 1976, the US Court of Appeals for the District of Columbia Circuit handed down decisions in the generic fuel cycle rulemaking and Midland appeals ruling that nuclear waste disposal and fuel reprocessing issues had been insufficiently considered by the AEC. In addition to consideration of the fuel cycle issues, the Court of Appeals remanded Consumer Power's construction permits for Midland to the NRC for further proceedings to consider energy conservation as an alternative to plant construction, and to consider any changed circumstances concerning the need of Dow for the process steam from the Midland Plant. 10 refs., 13 tabs

  7. Strategic petroleum reserve, Byran Mound Salt Dome, Brazoria County, Texas. Final environmental impact statement (final supplement to FEA FES 76/77-6)

    Energy Technology Data Exchange (ETDEWEB)

    1977-12-01

    On January 7, 1977, the Federal Energy Administration issued a Final Environmental Impact Statement (EIS) for the development of the Bryan Mound salt dome as a storage site for the Strategic Petroleum Reserve (FES 76/77-6). On October 1, 1977, the U.S. Department of Energy was created and the programs of the Federal Energy Administration were transferred to the new Department. As such, this final supplement is being issued by the Department of Energy. The salt dome is located in Brazoria County, Texas. Since the EIS was published, it has been determined that this arrangement would be inadequate to meet the long term requirements for filling and withdrawing oil at the site, although the disposal of brine to Dow Chemical would be utilized to the maximum extent possible. Therefore, on July 15, 1977, a Draft Supplement to FES 76/77-6 was issued addressing the environmental impacts of construction and operation of two types of brine disposal systems and a new water supply system. This final supplement addresses a brine injection well system and a water intake system. Construction of this new system component would cause temporary disruption to land use, water quality, air quality, and terrestrial and aquatic ecology. The new facilities would permanently change 17 acres of land from its present use. Operation of the systems would have relatively small, short-term impacts. Use of the brine surge pit could adversely affect air quality by emitting hydrocarbon vapors (maximum rate of 51.4 tons per year). Operation of the disposal wells would increase the salinity of an already saline aquifer. All operational impacts would be relatively minor and short-term, occurring only during periods of fill or withdrawal of the storage facility.

  8. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 1: Environmental Analysis and Technical Appendices.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and in comments on the Draft Environmental Impact Statement (EIS) include: (1) potential air quality impacts, such as emissions and their contribution to the {open_quotes}greenhouse{close_quotes} effect; (2) potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields; and (3) potential water quality and quantity impacts, such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial. The EIS is being mailed to numerous agencies, groups, and individuals (see Section 8.0). There will be a 30-day no-action period before any decisions are made and the Record of Decision is signed.

  9. Environmental program audit, Paducah Gaseous Diffusion Plant, Paducah, Kentucky. Final report

    International Nuclear Information System (INIS)

    1985-08-01

    The environmental monitoring program, environmental control equipment and its use, and the facility's compliance with DOE orders, Federal and State laws and regulations were evaluated in this audit. No imminent threat to public health and safety was discovered. A needed quality assurance program is being added. Recommendations are given

  10. 77 FR 65401 - Notice of Availability of the Final Environmental Impact Statement for the Restoration Design...

    Science.gov (United States)

    2012-10-26

    ... environmentally responsible production of renewable energy and allows the permitting of future renewable energy..., including solar and wind energy technologies, and to establish a baseline set of environmental protection...), which are BLM-administered lands that are suitable for the development of solar and wind energy...

  11. Final Environmental Assessment for the Military Housing Privatization Initiative (MHPI), Dyess Air Force Base, Texas

    Science.gov (United States)

    2011-07-01

    SGOAB Capt Mark Sakai Weapons Safety/Explosive Ordnance Disposal 7 BW/SEW Shari Riley Real Property Office 7 CES/CEAOR Sgt Alicia Uerena Entomology...Water Resources / Soils Alysia Baumann 5 years, environmental science B.S., Chemical Engineering Air Quality Luis Diaz 15 years, environmental

  12. Indian Point Nuclear Generating Plant Unit No. 3 (Docket No. 50-286): Final environmental statement: Volume 2

    International Nuclear Information System (INIS)

    1975-02-01

    This document contains nine appendices to Volume I, The Final Environmental Impact Statement for the Indian Point Nuclear Generating Plant Unit Number Three. Topics covered include thermal discharges to the Hudson River; supplemental information relating to biological models; radiation effects on aquatic biota; conditions, assumptions, and parameters used in calculating radioactive releases; meteorology for radiological dispersion calculations; life history information of important fish species in the Hudson River near Indian Point; additional information on cooling towers considered as alternatives; data and calculations for assessment of predicted electrical demand; and comments on draft environmental statement

  13. 40 CFR 721.10017 - Amine terminated bisphenol A diglycidyl ether polymer (generic).

    Science.gov (United States)

    2010-07-01

    ... diglycidyl ether polymer (generic). 721.10017 Section 721.10017 Protection of Environment ENVIRONMENTAL... ether polymer (generic). (a) Chemical substances and significant new uses subject to reporting. (1) The chemical substances identified generically as amine terminated bisphenol A diglycidyl ether polymer (PMNs P...

  14. Generic Hurricane Extreme Seas State

    DEFF Research Database (Denmark)

    Wehmeyer, Christof; Skourup, Jesper; Frigaard, Peter

    2012-01-01

    Extreme sea states, which the IEC 61400-3 (2008) standard requires for the ultimate limit state (ULS) analysis of offshore wind turbines are derived to establish the design basis for the conceptual layout of deep water floating offshore wind turbine foundations in hurricane affected areas....... Especially in the initial phase of floating foundation concept development, site specific metocean data are usually not available. As the areas of interest are furthermore not covered by any design standard, in terms of design sea states, generic and in engineering terms applicable environmental background...... data is required for a type specific conceptual design. ULS conditions for different return periods are developed, which can subsequently be applied in siteindependent analysis and conceptual design. Recordings provided by National Oceanic and Atmospheric Administration (NOAA), of hurricanes along...

  15. Generic and biosimilar medicines: quid?

    Directory of Open Access Journals (Sweden)

    Steven Simoens

    2012-12-01

    Full Text Available Once intellectual property protection, data and marketing exclusivity of reference medicines have expired, generic medicines and biosimilar medicines can enter the off-patent market. This market entry is conditional on the approval of marketing authorization, pricing and reimbursement. Given that there tends to be confusion surrounding generic and biosimilar medicines, this Editorial introduces basic concepts related to generic and biosimilar medicines and presents the different studies and articles included in this supplement dedicated to generic and biosimilar medicines.

  16. Environmental program audit: Oak Ridge Gaseous Diffusion Plant, Roane County, Tennessee. Final report

    International Nuclear Information System (INIS)

    Smith, W.M.; Waller, R.

    1985-01-01

    An environmental audit of the Oak Ridge Gaseous Diffusion Plant (ORGDP) was conducted by a team of NUS scientists and engineers during the week of June 3 through June 7, 1985. ORGDP is owned by the Department of Energy and operated by Martin-Marietta Energy Systems, Inc. To enrich uranium feedstocks for nuclear fuels. The team evaluated ORGDP in terms of compliance with environmental regulations and DOE Orders, the adequacy of pollution control equipment, the effectiveness of environmental monitoring, and the application of quality control procedures to environmental programs. The audit was conducted by observing operations, inspecting facilities, evaluating analysis and monitoring techniques, reviewing reports and data, and interviewing personnel. Overall, the ORGDP environmental program appears to be well structured and has attempted to address all areas of air, water, and land media likely to be affected by the operations of the facility. The plant management is knowledgeable about environmental concerns and has established clear, well-defined goals to address these areas. An adequate professional staff is available to manage the environmental program

  17. Environmental Impact Analysis Process. Final Environmental Impact Statement Supersonic Flight Operations in the Valentine Military Operations Area

    Science.gov (United States)

    1983-11-04

    Federal Activities, U.S. Environmental Protection Agency, Washington, D.C. Sincerely yours,, PD k Whittington , P.E Regional Administrator Enclosure I I I I...many of the residents are deprived , disadvantaged; uninformed and part of a minority); nor is anyone certain the AF will make full restitUtion in light...only wash 217 our home away but would deprive to us of water for the pipelines that supply 217 water over the whole ranch. This reservoir has been here

  18. Generics Pricing: The Greek Paradox.

    Science.gov (United States)

    Karafyllis, Ioannis; Variti, Lamprini

    2017-01-01

    This paper explains and develops a methodological framework to help evaluate the performance of generic pharmaceutical policies and the correct evaluation of generics sales. Until today erroneous recording of generics does not help proper pricing and their penetration in the Greek market. This classifies Greece on the outliners in every study or comparison that is referred on papers or studies.

  19. Occidental Geothermal, Inc. , Oxy geothermal power plant No. 1. Final environmental impact report

    Energy Technology Data Exchange (ETDEWEB)

    1981-12-01

    The project-specific environmental analysis covers the following: geology, soils, water resources, biology, air quality, noise, waste management, health, safety, transportation, energy and material resources, cultural resources, socioeconomics, public services, land use, and aesthetics. Other topics covered are: the cumulative envionmental analysis; unavoidable significant adverse environmental effects; irreversible environmental changes and irretrievable commitments of energy and materials; the relationship between local short-term uses of man's environment and the maintenance and enhancement of long-term productivity; growth-inducing impacts; and alternatives to the proposed action. (MHR)

  20. Generic Reed Solomon Encorder

    Directory of Open Access Journals (Sweden)

    Petrus Mursanto

    2006-11-01

    Full Text Available Reed Solomon (RS codes is a mechanism to detect and correct burst of errors in data transmission and storage systems. It provides a solid introduction to foundation mathematical concept of Galois Field algebra and its application. With the development of digital hardware technology, the RS concepts were brought into reality, i.e. the implementation of RS codec chips. This paper presents the development steps of a generic RS encoder using VHDL. The encoder is able to handle generic width of data, variable length of information, number of error as well as variable form of primitive polynomial and generator polynomial used in the system. The design has been implemented for FPGA chip Xilinx XC3S200-5FT256 and has a better performance than commercially available equivalent encoder.

  1. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix C: Anadromous Fish and Juvenile Fish Transportation.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    This Appendix C of the Final Environmental Impact Statement for the Columbia River System discusses impacts on andromous fish and juvenile fish transportation. The principal andromous fish in the Columbia basin include salmonid species (Chinook, coho, and sockeye salmon, and steelhead) and nonsalmoinid andromous species (sturgeon, lamprey, and shad). Major sections in this document include the following: background, scope and process; affected environment for salmon and steelhead, shaded, lamprey, sturgeon; study methods; description of alternatives: qualitative and quantitative findings.

  2. Environmental Shortcourse Final report [Joint US-EC Short Course on Environmental Biotechnology: Microbial Catalysts for the Environment

    Energy Technology Data Exchange (ETDEWEB)

    Zylstra, Gerben; van der Meer, Jan Roelof

    2013-03-05

    The Joint US-EC Short Course on Environmental Biotechnology is designed for several purposes. One of the central tenets is to bring together young scientists (at the late Ph.D. or early postdoctoral stages of their careers) in a forum that will set the groundwork for future overseas collaborative interactions. The course is also designed to give the scientists hands-on experience in modern, up-to-date biotechnological methods for the analysis of microbes and their activities pertinent to the remediation of pollutants in the environment. The 2011 course covered multiple theoretical and practical topics in environmental biotechnology. The practical part was centered around a full concise experiment to demonstrate the possibility for targeted remediation of contaminated soil. Experiments included chemical, microbiological, and molecular analyses of sediments and/or waters, contaminant bioavailability assessment, seeded bioremediation, gene probing, PCR amplification, microbial community analysis based on 16S rRNA gene diversity, and microarray analyses. Each of these topics is explained in detail. The practical part of the course was complemented with two lectures per day, given by distinguished scientists from the US and from Europe, covering a research area related to what the students are doing in the course.

  3. Generic safety documentation model

    International Nuclear Information System (INIS)

    Mahn, J.A.

    1994-04-01

    This document is intended to be a resource for preparers of safety documentation for Sandia National Laboratories, New Mexico facilities. It provides standardized discussions of some topics that are generic to most, if not all, Sandia/NM facilities safety documents. The material provides a ''core'' upon which to develop facility-specific safety documentation. The use of the information in this document will reduce the cost of safety document preparation and improve consistency of information

  4. Strategies for communicating quality expectations for environmental service contracts : final report.

    Science.gov (United States)

    2017-03-01

    This study explores the communication of quality expectations between the Office of Environment Services (OES) and environmental consulting firms contributing to the Plan Development Process of the Georgia Department of Transportation (GDOT). The ove...

  5. 77 FR 26316 - Progress Energy Florida; Final Environmental Impact Statement for Combined Licenses for Levy...

    Science.gov (United States)

    2012-05-03

    ... at 600 Gilbert Street, Bronson. FOR FURTHER INFORMATION CONTACT: Mr. Douglas Bruner, Environmental.... Bruner may be contacted by telephone at 301-415-2730 or via email at Douglas.Bruner@nrc.gov . Dated at...

  6. Generic medicines: Perceptions of Physicians in Basrah, Iraq

    Directory of Open Access Journals (Sweden)

    Adheed Khalid Sharrad

    2009-08-01

    Full Text Available BackgroundThe use of cheaper generic medicines is a strategy promotedin many countries to reduce rising health care costs. The aimof this study was to explore factors affecting generic medicineprescribing by physicians in Basrah, Iraq.MethodologyA purposive sample of ten physicians practicing in Basrahwas interviewed using a semi-structured interview guide.ResultsAnalysis of the interviews identified seven major themes:medicine prescribing practice, knowledge of therapeuticequivalency of generic medicine, patients’ acceptance ofgeneric medicine, counterfeit medicine, drug informationsource and effect of drug advertising on medicines choice,brand substitution practice by community pharmacists, and,finally strategies to improve generic medicine usefulness.Participants identified helpful strategies to increase genericprescribing including; physician and patient education ongeneric medicine; persuading physicians about the safety andefficacy of generic medicines; and finally educating seniormedical students on generic prescribing.ConclusionThe data suggest that participants were enthusiasticabout prescribing generic medicines. However physiciansinsist that pharmacists should not be allowed tosubstitute generic drugs without prior approval ofdoctors.

  7. Final environmental statement related to the operation of Millstone Nuclear Power Station, Unit No. 3 (Docket No. 50-423)

    International Nuclear Information System (INIS)

    1984-12-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with the operation of Millstone Nuclear Power Station, Unit 3, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land use and terrestrial and aquatic ecological impacts will be small. Operational impacts to historic and archeologic sites will be small. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. The net socioeconomic effects of the project will be beneficial. On the basis of the analysis and evaluation set forth in this environmental statement, it is concluded that the action called for under NEPA and 10 CFR 51 is the issuance of an operating license for Millstone Nuclear Power Station, Unit 3. 101 references, 33 figures, 30 tables

  8. Final Environmental Statement related to the operation of Nine Mile Point Nuclear Station, Unit No. 2 (Docket No. 50-410)

    International Nuclear Information System (INIS)

    1985-05-01

    This Final Environmental Statement contains the assessment of the environmental impact associated with the operation of the Nine Mile Point Nuclear Station, Unit 2, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs

  9. 78 FR 26063 - Central Utah Project Completion Act; East Hobble Creek Restoration Project Final Environmental...

    Science.gov (United States)

    2013-05-03

    ...-100-00-0-0, CUPCA00] Central Utah Project Completion Act; East Hobble Creek Restoration Project Final... Creek Restoration Project. These two agencies have determined that the proposed [[Page 26064

  10. Comparison of generic-to-brand switchback patterns for generic and authorized generic drugs

    Science.gov (United States)

    Hansen, Richard A.; Qian, Jingjing; Berg, Richard; Linneman, James; Seoane-Vazquez, Enrique; Dutcher, Sarah K.; Raofi, Saeid; Page, C. David; Peissig, Peggy

    2018-01-01

    Background While generic drugs are therapeutically equivalent to brand drugs, some patients and healthcare providers remain uncertain about whether they produce identical outcomes. Authorized generics, which are identical in formulation to corresponding brand drugs but marketed as a generic, provide a unique post-marketing opportunity to study whether utilization patterns are influenced by perceptions of generic drugs. Objectives To compare generic-to-brand switchback rates between generics and authorized generics. Methods A retrospective cohort study was conducted using claims and electronic health records data from a regional U.S. healthcare system. Ten drugs with authorized generics and generics marketed between 1999 and 2014 were evaluated. Eligible adult patients received a brand drug during the 6 months preceding generic entry, and then switched to a generic or authorized generic. Patients in this cohort were followed for up to 30 months from the index switch date to evaluate occurrence of generic-to-brand switchbacks. Switchback rates were compared between patients on authorized generics versus generics using Kaplan-Meier curves and Cox proportional hazards models, controlling for individual drug effects, age, sex, Charlson comorbidity score, pre-index drug use characteristics, and pre-index healthcare utilization. Results Among 5,542 unique patients that switched from brand-to-generic or brand-to-authorized generic, 264 (4.8%) switched back to the brand drug. Overall switchback rates were similar for authorized generics compared with generics (HR=0.86; 95% CI 0.65-1.15). The likelihood of switchback was higher for alendronate (HR=1.64; 95% CI 1.20-2.23) and simvastatin (HR=1.81; 95% CI 1.30-2.54) and lower for amlodipine (HR=0.27; 95% CI 0.17-0.42) compared with other drugs in the cohort. Conclusions Overall switchback rates were similar between authorized generic and generic drug users, indirectly supporting similar efficacy and tolerability profiles for

  11. Indoor Measurements of Environmental Tobacco Smoke Final Report to the Tobacco Related Disease Research Program

    Energy Technology Data Exchange (ETDEWEB)

    Apte, Michael G.; Gundel, Lara A.; Dod, Raymond L.; Russell, Marion L.; Singer, Brett C.; Sohn, Michael D.; Sullivan, Douglas P.; Chang, Gee-Minn; Sextro, Richard G.

    2004-03-02

    The objective of this research project was to improve the basis for estimating environmental tobacco smoke (ETS) exposures in a variety of indoor environments. The research utilized experiments conducted in both laboratory and ''real-world'' buildings to (1) study the transport of ETS species from room to room, (2) examine the viability of using various chemical markers as tracers for ETS, and (3) to evaluate to what extent re-emission of ETS components from indoor surfaces might add to the ETS exposure estimates. A three-room environmental chamber was used to examine multi-zone transport and behavior of ETS and its tracers. One room (simulating a smoker's living room) was extensively conditioned with ETS, while a corridor and a second room (simulating a child's bedroom) remained smoking-free. A series of 5 sets of replicate experiments were conducted under different door opening and flow configurations: sealed, leaky, slightly ajar, wide open, and under forced air-flow conditions. When the doors between the rooms were slightly ajar the particles dispersed into the other rooms, eventually reaching the same concentration. The particle size distribution took the same form in each room, although the total numbers of particles in each room depended on the door configurations. The particle number size distribution moved towards somewhat larger particles as the ETS aged. We also successfully modeled the inter-room transport of ETS particles from first principles--using size fractionated particle emission factors, predicted deposition rates, and thermal temperature gradient driven inter-room flows, This validation improved our understanding of bulk inter-room ETS particle transport. Four chemical tracers were examined: ultraviolet-absorbing particulate matter (UVPM), fluorescent particulate matter (FPM), nicotine and solanesol. Both (UVPM) and (FPM) traced the transport of ETS particles into the non-smoking areas. Nicotine, on the other hand

  12. Final environmental statement. Final addendum to Part II: Manufacture of floating nuclear power plants by Offshore Power Systems. DOCKET-STN--50-437

    International Nuclear Information System (INIS)

    1978-06-01

    This Addendum to Part II of the Final Environmental Statement related to manufacture of floating nuclear power plants by Offshore Power Systems (OPS), NUREG-0056, issued September 1976, was prepared by the U.S. Nuclear Regulatory Commission (NRC), Office of Nuclear Reactor Regulation. The staff's basic evaluation is presented in NUREG-0056. The current Addendum provides further consideration of a number of topics discussed in NUREG-0056, particularly additional consideration of shore zone siting at estuarine and ocean regions. This Summary and Conclusions recapitulates and is cumulative for Part II of the FES and the current Addendum. Augmentations to the Summary and Conclusions presented in Part II of the FES and arising from the evaluations contained in this Addendum are italicized

  13. Final Environmental Impact Statement on 10 CFR Part 61 licensing requirements for land disposal of radioactive waste

    International Nuclear Information System (INIS)

    1982-11-01

    The three-volume final environmental impact statement (FEIS) is prepared to guide and support publication of a final regulation, 10 CFR Part 61, for the land disposal of low-level radioactive waste. The FEIS is prepared in response to public comments received on the draft environmental impact statement (DEIS) on the proposed Part 61 regulation. The DEIS was published in September 1981 as NUREG-0782. Public comments received on the proposed Part 61 regulation separate from the DEIS are also considered in the FEIS. The FEIS is not a rewritten version of the DEIS, which contains an exhaustive and detailed analysis of alternatives, but rather references the DEIS and presents the final decision bases and conclusions (costs and impacts) which are reflected in the Part 61 requirements. Four cases are specifically considered in the FEIS representing the following: past disposal practice, existing disposal practice, Part 61 requirements, and an upper bound example. The Summary and Main Report are contained in Volume 1. Volume 2 consists of Appendices A - Staff Analysis of Public Comments on the DEIS for 10 CFR Part 61, and Appendices B - Staff Analysis of Public Comments on Proposed 10 CFR Part 61 Rulemaking. Volume 3 contains Appendices C-F, entitled as follows: Appendix C - Revisions to Impact Analysis Methodology, Appendix D - Computer Codes Used for FEIS Calculations, Appendix E - Errata for the DEIS for 10 CFR Part 61 and last, Appendix F - Final Rule and Supplementary Information

  14. Final environmental assessment and Finding-of-No-Significant-Impact - drum storage facility for interim storage of materials generated by environmental restoration operations

    International Nuclear Information System (INIS)

    1994-09-01

    The Department of Energy (DOE) has prepared an Environmental Assessment (EA), DOE/EA-0995, for the construction and operation of a drum storage facility at Rocky Flats Environmental Technology Site, Golden, Colorado. The proposal for construction of the facility was generated in response to current and anticipated future needs for interim storage of waste materials generated by environmental restoration operations. A public meeting was held on July 20, 1994, at which the scope and analyses of the EA were presented. The scope of the EA included evaluation of alternative methods of storage, including no action. A comment period from July 5, 1994 through August 4, 1994, was provided to the public and the State of Colorado to submit written comment on the EA. No written comments were received regarding this proposed action, therefore no comment response is included in the Final EA. Based on the analyses in the EA, DOE has determined that the proposed action would not significantly affect the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an Environmental Impact Statement is not required and the Department is issuing this Finding of No Significant Impact

  15. Environmental impact analysis of electric and hybrid vehicle batteries. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1977-12-16

    This environmental impact analysis of electric and hybrid vehicle batteries is intended to identify principal environmental impacts resulting directly or indirectly from the development of electric vehicle batteries. Thus, the result of this study could be used to determine the appropriate following step in the U.S. DOE's EIA process. The environmental impacts considered in this document are the incremental impacts generated during the various phases in the battery life cycle. The processes investigated include mining, milling, smelting, and refining of metallic materials for electrode components; manufacturing processes of inorganic chemicals and other materials for electrolytes and other hardware components; battery assembly processes; operation and maintenance of batteries; and recycling and disposal of used batteries. The severity of the incremental impacts is quantified to the extent consistent with the state-of-knowledge. Many of the industrial processes involve proprietary or patent information; thus, in many cases, the associated environmental impacts could not be determined. In addition, most candidate battery systems are still in the development phase. Thus, the manufacturing and recycling processes for most battery systems either have not been developed by industry, or the information is not available. For these cases, the associated environmental impact evaluations could only be qualitative, and the need for further investigations is indicated. 26 figures, 27 tables. (RWR)

  16. Integrated environmental control and monitoring in the intelligent workplace. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    This project involved the design and engineering of the control and monitoring of environmental quality - visual, thermal, air - in the Intelligent Workplace. The research objectives were to study the performance of the individual systems, to study the integration issues related to each system, to develop a control plan, and to implement and test the integrated systems in a real setting. In this project, a control strategy with related algorithms for distributed sensors, actuators, and controllers for negotiating central and individual control of HVAC, lighting, and enclosure was developed in order to maximize user comfort, and energy and environmental effectiveness. The goal of the control system design in the Intelligent Workplace is the integration of building systems for optimization of occupant satisfaction, organizational flexibility, energy efficiency and environmental effectiveness. The task of designing this control system involves not only the research, development and demonstration of state-of-the-art mechanical and electrical systems, but also their integration. The ABSIC research team developed functional requirements for the environmental systems considering the needs of both facility manager and the user. There are three levels of control for the environmental systems: scheduled control, sensor control, and user control. The challenges are to achieve the highest possible levels of energy effectiveness simultaneously with the highest levels of user satisfaction. The report describes the components of each system, their implementation in the Intelligent Workplace and related control and monitoring issues.

  17. Final Environmental Assessment for solid waste disposal, Nevada Test Site, Nye County, Nevada

    International Nuclear Information System (INIS)

    1995-08-01

    New solid waste regulations require that the existing Nevada Test Site (NTS) municipal landfills, which receive less than 20 tons of waste per day, be permitted or closed by October 9, 1995. In order to be permitted, the existing landfills must meet specific location, groundwater monitoring, design, operation, and closure requirements. The issuance of these regulations has resulted in the need of the Department of Energy (DOE) to provide a practical, cost-effective, environmentally sound means of solid waste disposal at the NTS that is in compliance with all applicable federal, state, and local regulations. The current landfills in Areas 9 and 23 on the Nevada Test Site do not meet design requirements specified in new state and federal regulations. The DOE Nevada Operations Office prepared an environmental assessment (EA) to evaluate the potential impacts of the proposal to modify the Area 23 landfill to comply with the new regulations and to close the Area 9 landfill and reopen it as Construction and Demolition debris landfill. Based on information and analyses presented in the EA, DOE has determined that the proposed action would not constitute a major federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act. Therefore, an environmental impact statement (EIS) is not required. This report contains the Environmental Assessment, as well as the Finding of No Significant Impact (FONSI)

  18. Mid-Columbia Coho Reintroduction Feasibility Project : Final Environmental Assessment and Finding of No Significant Impact.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Confederated Tribes and Bands of the Yakama Nation; Washington State Department of Fish and Wildlife

    1999-04-01

    Bonneville Power Administration (BPA) is proposing to fund research for 2 to 3 years on the feasibility of reintroducing coho salmon into mid-Columbia River basin tributaries. The research would take place in the Methow and Wenatchee river basins in Chelan and Okanogan Counties, Washington. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1282) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact.

  19. Lower Yakima Valley Wetlands and Riparian Restoration Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1994-01-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Mitigation Agreement pertaining to the Lower Yakima Valley Wetlands and Riparian Restoration Project (Project) in a cooperative effort with the Yakama Indian Nation and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities for the Project within the boundaries of the Yakama Indian Reservation. This Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large 20, 340 hectare (50, 308 acre) project area. As individual properties are secured for the Project, three site-specific activities (habitat enhancement, operation and maintenance, and monitoring and evaluation) may be subject to further site-specific environmental review. All required Federal/Tribal coordination, permits and/or approvals would be obtained prior to ground disturbing activities

  20. Mid-Columbia Coho Reintroduction Feasibility Project. Final Environmental Assessment and Finding of No Significant Impact

    International Nuclear Information System (INIS)

    1999-01-01

    Bonneville Power Administration (BPA) is proposing to fund research for 2 to 3 years on the feasibility of reintroducing coho salmon into mid-Columbia River basin tributaries. The research would take place in the Methow and Wenatchee river basins in Chelan and Okanogan Counties, Washington. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1282) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact

  1. Environmentally based siting assessment for synthetic-liquid-fuels facilities. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-01-01

    A detailed assessment of the major environmental constraints to siting a synthetic fuels industry and the results of that assessment are used to determine on a regional basis the potential for development of such an industry with minimal environmental conflicts. Secondly, the ability to mitigate some of the constraining impacts through alternative institutional arrangements, especially in areas that are judged to have a low development potential is also assessed. Limitations of the study are delineated, but specifically, the study is limited geographically to well-defined boundaries that include the prime coal and oil shale resource areas. The critical factors used in developing the framework are air quality, water availability, socioeconomic capacity, ecological sensitivity, environmental health, and the management of Federally owned lands. (MCW)

  2. Adequacy of environmental information for outer continental shelf oil and gas decisions: Georges Bank. Final report

    International Nuclear Information System (INIS)

    1991-01-01

    Georges Bank, a large, shallow marine bank with important fishery resources and possibly important oil and gas resources, lies east of Massachusetts in the territorial waters of both the United States and Canada. The Department of the Interior has planned since 1974 to lease parts of the north Atlantic outer continental shelf (OCS)--including part of Georges Bank--for oil and gas exploration. As a result of public concern about the environmental impacts of oil and gas production on the U.S. OCS, Congress declared a moratorium on drilling on Georges Bank and an area to the southwest. The report--by the NRC's Committee to Review the Outer Continental Shelf Environmental Studies Program and its panels on physical oceanography, ecology, and socioeconomics--reviews the adequacy of information bearing on the potential environmental impacts of OCS oil and gas activities for the Georges Bank sale area

  3. Assessment of environmental aspects of uranium mining and milling. Final report, 12 February--7 July 1976

    International Nuclear Information System (INIS)

    Reed, A.K.; Meeks, H.C.; Pomeroy, S.E.; Hale, V.Q.

    1976-12-01

    This research program was initiated with the basic objective of making a preliminary assessment of the potential environmental impacts associated with the mining and milling of domestic uranium ores. All forms of pollution except radiation were considered. The program included a review of the characteristics and locations of domestic uranium ore reserves and a review of the conventional methods for mining and milling these ores. Potential environmental impacts associated with the entire cycle from exploration and mining to recovery and production of yellowcake are identified and discussed. Land reclamation aspects are also discussed. The methods currently used for production of yellowcake were divided into four categories - open pit mining-acid leach process, underground mining-acid leach process, underground mining-alkaline leach process, and in-situ mining. These are discussed from the standpoint of typical active mills which were visited during the program. Flowsheets showing specific environmental impacts for each category are provided

  4. Lower Yakima Valley Wetlands and Riparian Restoration Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration

    1994-10-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Mitigation Agreement pertaining to the Lower Yakima Valley Wetlands and Riparian Restoration Project (Project) in a cooperative effort with the Yakama Indian Nation and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities for the Project within the boundaries of the Yakama Indian Reservation. This Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large 20, 340 hectare (50, 308 acre) project area. As individual properties are secured for the Project, three site-specific activities (habitat enhancement, operation and maintenance, and monitoring and evaluation) may be subject to further site-specific environmental review. All required Federal/Tribal coordination, permits and/or approvals would be obtained prior to ground disturbing activities.

  5. Tucannon River Spring Chinook Captive Broodstock Program Final Environmental Assessment and Finding of No Significant Impact

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2000-05-24

    Bonneville Power Administration (BPA) is proposing to fund the Tucannon River Spring Chinook Captive Broodstock Program, a small-scale production initiative designed to increase numbers of a weak but potentially recoverable population of spring chinook salmon in the Tucannon River in the State of Washington. BPA has prepared an Environmental Assessment (EA) (DOE/EA-l326) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI).

  6. Review and assessments of potential environmental, health and safety impacts of MHD technology. Final draft

    Energy Technology Data Exchange (ETDEWEB)

    1978-01-01

    The purpose of this document is to develop an environmental, health and safety (EH and S) assessment and begin a site - specific assessment of these and socio - economic impacts for the magnetohydrodynamics program of the United States Department of Energy. This assessment includes detailed scientific and technical information on the specific EH and S issues mentioned in the MHD Environmental Development Plan. A review of current literature on impact-related subjects is also included. This document addresses the coal-fired, open-cycle MHD technology and reviews and assesses potential EH and S impacts resulting from operation of commercially-installed technology.

  7. Cook Inlet Planning Area oil and gas lease sale 149: Final environmental impact statement. Volume 2

    International Nuclear Information System (INIS)

    1996-01-01

    This environmental impact statement discusses a proposed oil and gas lease sale in the Cook Inlet Planning Area, analyzes its potential effects on the environment, describes alternatives, presents major issues determined through the scoping process and staff analyses, and evaluates potential mitigating measures. During the Draft Environmental Impact Statement comment period, written statements and oral testimonies were provided by various governmental agencies, organizations, businesses, and individuals. This report contains a review and analysis of comments received on the above issues. Appendices are included which contain resource estimates and various issues relating to oil spills

  8. A critical assessment of the perceptions of graduates regarding their generic skills level: an exploratory study

    Directory of Open Access Journals (Sweden)

    Elroy Eugene Smith

    2011-09-01

    Full Text Available This article outlines the perceptions of potential Business Management graduates regarding their generic skills level.  To achieve the aim of this article, a literature study and empirical research were undertaken.  A self-administered questionnaire was distributed to 205 potential Business Management graduates at a tertiary institution. To investigate the relationship between the independent and dependent variables, thirteen null-hypotheses were tested.  The results revealed some significant relationships between these variables.  Seven predetermined generic skills factors, namely basic, communication, management, environmental awareness, intellectual, self and career management as well as interpersonal skills, were identified and empirically tested in this article.  Skills development should take place within an overall framework providing for the coordination and progression of skills development from first to final year of study.  Future curricula development should specifically focus on developing those skills lacking most by potential graduates as identified in this article.

  9. Waste Isolation Pilot Plant disposal phase final supplemental environmental impact statement. Volume 1, Chapters 1--6

    International Nuclear Information System (INIS)

    1997-09-01

    The purpose of the Waste Isolation Pilot Plant Disposal Final Supplemental Environmental Impact Statement (SEIS-II) is to provide information on environmental impacts regarding the Department of Energy's (DOE) proposed disposal operations at WIPP. The Proposed Action describes the treatment and disposal of the Basic inventory of TRU waste over a 35-year period. The Action Alternatives proposed the treatment of the Basic Inventory and an Additional Inventory as well as the transportation of the treated waste to WIPP for disposal over a 150- to 190-year period. The three Action Alternatives include the treatment of TRU waste at consolidation sites to meet WIPP planning-basic Waste Acceptance Criteria, the thermal treatment of TRU waste to meet Land Disposal Restrictions, and the treatment of TRU waste by a shred and grout process. SEIS-II evaluates environmental impacts resulting from the various treatment options; the transportation of TRU waste to WIPP using truck, a combination of truck and regular rail service, and a combination of truck and dedicated rail service; and the disposal of this waste in the repository. Evaluated impacts include those to the general environment and to human health. Additional issues associated with the implementation of the alternatives are discussed to provide further understanding of the decisions to be reached and to provide the opportunity for public input on improving DOE's Environmental Management Program. Chapters 1--6 include an introduction, background information, description of the proposed action and alternatives, description of the affected environments, environmental impacts, and consultations and permits

  10. Final environmental statement related to the operation of Callaway Plant, Unit No. 1 (Docket No. 50-483)

    International Nuclear Information System (INIS)

    1982-01-01

    The final environmental statement contains the second assessment of the environmental impact associated with operation of Callaway Plant Unit 1, pursuant to the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Par 51, as amended, of the NRC's regulations. This statement examines: the purpose and need for the Callaway project, alternatives to the project, the affected environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. No water-use impacts are expected from cooling-tower markup withdrawn from, or blowdown discharged into, the Missouri River. Land-use and terrestrial- and aquatic-ecological impacts will be small. Air-quality impacts from cooling-tower drift and other emissions and dust will also be small. Impacts to historic and prehistoric sites will be negligible with the development and implementation of the applicant's cultural-resources management plan. No significant impacts are anticipated from normal operational releases of radioactivity. The risk associated with accidental radiation exposure is very low. The net socioeconomic effects of the project will be beneficial. The action called for is the issuance of an operating license for Unit 1 of the Callaway Plant. 18 figs., 16 tabs

  11. 75 FR 45109 - Kern River Gas Transmission Company; Notice of Availability of the Final Environmental Impact...

    Science.gov (United States)

    2010-08-02

    ... effects of the construction and operation of the Apex Expansion Project in accordance with the... environmental effects of the construction and operation of the following project facilities: [[Page 45110... the Dry Lake Compressor Station located in Clark County, Nevada; Six mainline valves; and Three pig \\2...

  12. 77 FR 38821 - Final Environmental Impact Statement for the Menominee Indian Tribe of Wisconsin's Proposed Fee...

    Science.gov (United States)

    2012-06-29

    ..., with the Menominee Indian Tribe of Wisconsin (Tribe), the National Indian Gaming Commission (NIGC), the... III gaming would be conducted inside the existing clubhouse until the new casino is built. The FEIS..., environmental justice, cumulative effects, indirect effects and mitigation. The BIA has afforded other...

  13. 78 FR 4134 - Availability of the Draft Finding of No Significant Impact and Final Programmatic Environmental...

    Science.gov (United States)

    2013-01-18

    ... Afghanistan, while reducing spending without sacrificing critical national defense capabilities. The draft... military personnel to maximum increases of 3,000 at the Army's largest installations) was chosen for the... a total of 1,000 military personnel. The PEA analyzes the environmental impact of two Action...

  14. Impact of cruise control on traffic safety, energy consumption and environmental pollution : final report

    NARCIS (Netherlands)

    Hoedemaeker, D.M.; Brouwer, R.F.T.; Malone, K.; Klunder, G.; et al

    2006-01-01

    In this subproject, the impact of Cruise Control (CC) was analysed with respect to traffic safety, energy consumption, and environmental pollution. In order to work on this topic from a European perspective, a team of European experts in the fields of driver assistance systems, human factors,

  15. 76 FR 55155 - Final Environmental Impact Statement for the Proposed Keystone XL Project

    Science.gov (United States)

    2011-09-06

    ... border of the U.S. and Canada for the transport of crude oil across the U.S./Canada international... proposed Project that is designed to transport crude oil produced from oil sands in the Western Canadian... security; environmental, cultural, and economic impacts. Before making a decision on the proposed Project...

  16. 77 FR 39253 - Final Environmental Impact Statement on the Denali Park Road Vehicle Management Plan, Denali...

    Science.gov (United States)

    2012-07-02

    ... online at the NPS Planning, Environmental and Public Comment Web site at http://parkplanning.nps.gov/dena... served well as a way to manage vehicle use, while providing high quality visitor opportunities to see... framework for vehicle use based on indicators and standards for visitor experiences and resource protection...

  17. Environmental overview for the development of geothermal resources in the State of New Mexico. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Bryant, M.; Starkey, A.H.; Dick-Peddie, W.A.

    1980-06-01

    A brief overview of the present day geothermal applications for hydrothermal electrical generation and direct heat use and their environmental implications is provided. Technologies and environmental impacts are considered at all points on the pathway of development resource exploration; well field, plant and transmission line construction; and plant operation. The technologies for electrical generation-direct, dry steam conversion; separated steam conversion; single-flash conversion, separated-steam/single-flash conversion and binary cycle conversion and the technologies for direct heat use - direct use of geothermal waters, surface heat exhanger, down-the hole heat exchanger and heat pump are described. A summary of the geothermal technologies planned or in operation within New Mexico geothermal areas is provided. A review of regulations that affect geothermal development and its related environmental impact in New Mexico is presented. The regulatory pathway, both state and federal, of geothermal exploration after the securing of appropriate leases, development, and construction and implementation of a geothermal facility are described. Six categories (Geophysical, Water, Air, Noise, Biota and Socioeconomics) were selected for environmental assessment. The data available is described.

  18. Portsmouth Gasseous Diffusion Plant site, Piketon, Ohio. Final environmental impact statement. Volume 1

    International Nuclear Information System (INIS)

    1977-05-01

    This environmental statement provides a detailed analysis of the environmental effects associated with continued operation of the Portsmouth Gaseous Diffusion Plant, one of the three government-owned uranium enrichment plants operated by the Energy Research and Development Administration (ERDA). The Portsmouth facility, which has been operating for over twenty years, is located in Pike County, Ohio, on a 4000-acre federally owned reservation. The uranium enrichment capacity of the plant is currently being increased through a cascade improvement program (CIP) and a cascade uprating program (CUP). This environmental statement evaluates the Portsmouth facility at the fully uprated CUP production level. Environmental impacts of the production of offsite electric power for the Portsmouth facility are also assessed. The bulk of this power is supplied by the Ohio Valley Electric Corporation (OVEC) from two coal-fired plants, the Clifty Creek Power Plant near Madison, Indiana, and the Kyger Creek Power Plant near Cheshire, Ohio. The remaining required power will be obtained on a system basis through OVEC from the 15 sponsoring utilities of OVEC. The draft statement was issued for public comment on February 15, 1977, and public hearing to afford the public further opportunity to comment was held in Cincinnati, Ohio, on April 5, 1977

  19. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Appendix K (continued)

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains Appendices K (continued) of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment

  20. Expansion of U.S. uranium enrichment capacity. Final environmental statement

    International Nuclear Information System (INIS)

    1976-04-01

    Reasonably foreseeable environmental, social, economic, and technological costs and benefits of postulated expansion of U. S. enrichment capacity through the year 2000 and reasonably available alternatives to such expansion are described. Both the gas centrifuge and gaseous diffusion methods for the enrichment of uranium are considered in this impact assessment

  1. 78 FR 41418 - Malheur National Wildlife Refuge, Harney County, OR; Record of Decision for Final Environmental...

    Science.gov (United States)

    2013-07-10

    ... environmental education and interpretation. The Refuge engaged a diverse stakeholder base during the CCP process... opportunities for guided kayak and canoe tours on Malheur Lake. A stronger emphasis will be placed on modern... plants for traditional uses will expand. Monitoring and inventory of archaeological resources and...

  2. Columbia River System Operation Review final environmental impact statement. Appendix G: Land use and development

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. The SOR began in early 1990, prior to the filing of petitions for endangered status for several salmon species under the Endangered Species Act. The comprehensive review of Columbia River operations encompassed by the SOR was prompted by the need for Federal decisions to (1) develop a coordinated system operating strategy (SOS) for managing the multiple uses of the system into the 21st century; (2) provide interested parties with a continuing and increased long-term role in system planning (Columbia River Regional Forum); (3) renegotiate and renew the Pacific Northwest Coordination Agreement (PNCA), a contractual arrangement among the region's major hydroelectric-generating utilities and affected Federal agencies to provide for coordinated power generation on the Columbia River system; and (4) renew or develop new Canadian Entitlement Allocation Agreements. The review provides the environmental analysis required by the National Environmental Policy Act (NEPA). This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The environmental impact statement (EIS) itself and some of the other appendices present analyses of the alternative approaches to the other three decisions considered as part of the SOR

  3. 76 FR 29217 - Notice of Availability of the Final Programmatic Environmental Impact Statement for the...

    Science.gov (United States)

    2011-05-20

    ... support tern and plover populations on the Missouri River in a safe, efficient and cost-effective manner... Avenue, Omaha, NE 68102-4901, or by e-mail: [email protected] . For inquires from the media... recreation. After detailed consideration of the environmental and social impacts, and cumulative effects, of...

  4. Environmental Radiation Data: Report 47, July-September 1986. Final report

    International Nuclear Information System (INIS)

    1987-06-01

    This report is compiled and distributed quarterly by the Office of Radiation Programs' Eastern Environmental Radiation Facility (EERF), Montgomery, Alabama, and contains data from the Enviromental Radiation Ambient Monitoring System (ERAMS). Data from similar networks operated by contributing States, Canada, Mexico, and the Pan American Health Organization are reported in the ERD when available

  5. Southwest Center for Environmental Excellence and Opportunity Year End Report (Final Deliverable)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-11-09

    The Southwest Center for Environmental Excellence and Opportunity (Southwest CEEO) has been in existence since October 1996 at Albuquerque Technical Vocational Institute's (TVI) South Valley Campus. The Special Project was comprised of three objectives: (1) Increasing the number of Hispanics in careers related to the environment by improving education and job training opportunities; (2) Strengthening the infrastructure of Hispanic businesses and building their capacity to participate in environmental clean-up activities and potential technology commercialization; and (3) Increasing the Hispanic community's understanding of and participation in environmental protection through improved access to information and outreach activities, paying attention to cultural and linguistic issues. The Southwest CEEO has been successful in each of the above objective areas and continues to provide valuable services to TVI and the community. The Southwest CEEO has developed a scholarship/mentorship program involving business and industry, community organizations, and TVI faculty that will be replicated by other student mentorship programs. The Southwest CEEO has awarded approximately $50,000 over the two-year program funded by the U.S. Department of Energy Oakland Operations Office. The Southwest CEEO has also developed a K-12 partnership with Albuquerque Public Schools (APS) to enhance environmental education for students and professional development for teachers. Incorporated into these student activities are experimental learning opportunities and curriculum development and/or enhancement. The Southwest CEEO has worked closely with the TVI Small Business Development Center (SBDC) to support Hispanic businesses in technology partnership activities. The Southwest CEEO in partnership the TVI SBDC has provided a large business forum and business workshops. In addition, the Southwest CEEO has developed a Technology Transfer Model that will be expanded in the future to a

  6. 75 FR 75492 - Notice of Availability of the Final Environmental Impact Statement for the One Nevada...

    Science.gov (United States)

    2010-12-03

    ... Library, 950 Campton Street, Ely, Nevada BLM Nevada State Office, 1340 Financial Blvd., Reno, Nevada BLM... of an existing 345 kV transmission line at the new substation; an expansion of one existing... 2009. Nineteen comments were received and taken into consideration in the preparation of the Final EIS...

  7. Joint Maneuver Test Range on Eglin Air Force Base, Florida Final Environmental Assessment

    Science.gov (United States)

    2009-12-14

    ir Force B ase, Florida Page 3-2 Final E nvironm ental A ssessm ent A ffected E nvironm ent W ater R esources Figure 3-1. Physical and...nvironm ent W ater R esources Figure 3-2. Physical and Biological Resources Within Range B-9 Existing Components 14. Hills!Qoss Slope Legend --Creek

  8. 78 FR 8577 - Final Environmental Impact Statement; Izembek National Wildlife Refuge Proposed Land Exchange...

    Science.gov (United States)

    2013-02-06

    ... the threatened Steller's eider, threatened sea otter, threatened Steller sea lion, tundra swan, black... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R7-R-2012-N206; FXRS12650700000-134.... SUMMARY: We, the U.S. Fish and Wildlife Service (Service), announce the availability of a final...

  9. Analysis of environmental constraints on expanding reserves in current and future reservoirs in wetlands. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Harder, B.J.

    1995-03-01

    Louisiana wetlands require careful management to allow exploitation of non-renewable resources without destroying renewable resources. Current regulatory requirements have been moderately successful in meeting this goal by restricting development in wetland habitats. Continuing public emphasis on reducing environmental impacts of resource development is causing regulators to reassess their regulations and operators to rethink their compliance strategies. We examined the regulatory system and found that reducing the number of applications required by going to a single application process and having a coherent map of the steps required for operations in wetland areas would reduce regulatory burdens. Incremental changes can be made to regulations to allow one agency to be the lead for wetland permitting at minimal cost to operators. Operators need cost effective means of access that will reduce environmental impacts, decrease permitting time, and limit future liability. Regulators and industry must partner to develop incentive based regulations that can provide significant environmental impact reduction for minimal economic cost. In addition regulators need forecasts of future E&P trends to estimate the impact of future regulations. To determine future activity we attempted to survey potential operators when this approach was unsuccessful we created two econometric models of north and south Louisiana relating drilling activity, success ratio, and price to predict future wetland activity. Results of the econometric models indicate that environmental regulations have a small but statistically significant effect on drilling operations in wetland areas of Louisiana. We examined current wetland practices and evaluated those practices comparing environmental versus economic costs and created a method for ranking the practices.

  10. Generic study on the relation between contamination if primary coolants and occupational radiation exposure in nuclear power plants with PWR. Final report; Generische Studie zum Zusammenhang zwischen Kontamination von Primaerkreislaufmedien und beruflicher Strahlenexposition bei Kernkraftwerken mit Druckwasserreaktor. Abschlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Artmann, Andreas; Bruhn, Gerd; Schneider, Sebastian [Gesellschaft fuer Anlagen- und Reaktorsicherheit, Koeln (Germany); Strub, Erik [Koeln Univ. (Germany)

    2016-01-15

    A generic model for the primary cooling system contamination in pressurized water reactors and the resulting radiological consequences has been developed. The functional capability was demonstrated by means of three examples concerning manipulation procedures during revision outages. Activities at the main reactor coolant pumps were studied and the influence of the coolant contamination on the resulting dose rates and collective doses were calculated. The effect of a Co-90 hot spot in a more remote area on the radiation exposure during the specific action at the reactor pumps was considered.

  11. Generic patch inference

    DEFF Research Database (Denmark)

    Andersen, Jesper; Lawall, Julia

    2010-01-01

    A key issue in maintaining Linux device drivers is the need to keep them up to date with respect to evolutions in Linux internal libraries. Currently, there is little tool support for performing and documenting such changes. In this paper we present a tool, spdiff, that identifies common changes...... developers can use it to extract an abstract representation of the set of changes that others have made. Our experiments on recent changes in Linux show that the inferred generic patches are more concise than the corresponding patches found in commits to the Linux source tree while being safe with respect...

  12. Columbia River System Operation Review final environmental impact statement. Appendix P: Canadian Entitlement Allocation Agreements (CEAA)

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The purpose of this technical appendix is to provide the environmental review necessary to enter into agreements regarding the distribution between Federal and non-Federal project owners with respect to delivery of the Canadian Entitlement obligation to Canada for the period 1998 through 2024

  13. Amoco/Environmental Protection Agency Pollution Prevention Project, Yorktown refinery. Refinery release inventory. Final report

    International Nuclear Information System (INIS)

    Klee, H.; Kizier, G.J.; Baloo, S.; Hockman, E.L.; Couzens-Roberts, C.

    1992-07-01

    The report volume summarizes physical data obtained during a 2-year pollution prevention study of Amoco Oil Company's Yorktown Virginia Refinery. The study was jointly sponsored as a cooperative effort of Amoco Corporation and the United States Environmental Protection Agency. A multi-media sampling program was used to identify potential pollution sources within the Refinery. Sampling and analysis included air, surface water, groundwater, and solid waste data. Public perceptions about environmental issues of concern in the vicinity of the Refinery were also surveyed. The inventory showed that nearly 99 percent of the releases were airborne at the facility. Most of the remainder involved land disposal of solid wastes. Specific sources of major pollutants are identified

  14. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 2: Public Involvement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    In regard to the proposed Tenaska Washington II Generation Project, the goal of the Bonneville Power Administration`s (BPA) Environmental Impact Statement (EIS) public involvement process is to determine the issues to be examined and pertinent analyses to be conducted and to solicit comments on the content and quality of information presented in the Draft Environmental Impact Statement (DEIS). Comments and questions are solicited from the public and government agencies during the scoping process and during the comment period and public hearing on the DEIS, to find out what is of most concern to them. The end product of the public involvement process is the Comment Report which follows in part of this volume on Public Involvement.

  15. Environmental measurements and technology for non-proliferation objectives. Final report

    International Nuclear Information System (INIS)

    Broadway, J.A.

    1998-01-01

    The purpose of this study is to identify multi-disciplinary and single focus laboratories from the environmental and public health communities that can serve as technical center of opportunity for nuclear, inorganic and organic analyses. The objectives of the Office of Research and Development effort are twofold: (1) to identify the technology shortcomings and technologies gaps (thus requirements) within these communities that could benefit from state-of-the-art infield analysis technologies currently under development and (2) to promote scientist-to-scientist dialog and technical exchange under such existing US government internship programs (eg SABIT/USDOC) to improve skills and work relationships. Although the data analysis will focus on environmentally sensitive signatures and materials, the office of Research and Development wishes to further its nuclear non-proliferation objectives by assessing the current technical skill and ingenious analytical tools in less-developed countries so as to broaden the base of capability for multi-species measurement technology development

  16. Final Programmatic Environmental Impact Statement for stockpile stewardship and management: Volume 3

    International Nuclear Information System (INIS)

    1996-09-01

    The Department of Energy (DOE) has been directed by the President and Congress to maintain the safety and reliability of the reduced nuclear weapons stockpile in the absence of underground nuclear testing. In order to fulfill that responsibility, DOE has developed a Stockpile Stewardship and Management Program to provide a single highly integrated technical program for maintaining the continued safety and reliability of the nuclear stockpile. The Stockpile Stewardship and Management Programmatic Environmental Impact Statement (PEIS) describes and analyzes alternative ways to implement the proposed actions for the Stockpile Stewardship and Management Program. This document consists of Volume III, Appendix I entitled ''National Ignition Facility Project-Specific Analysis,'' which investigates the environmental impacts resulting from constructing and operating the proposed National Ignition Facility

  17. Environmental studies results: 1973-1992. Atlantic Outer Continental Shelf. Final report

    International Nuclear Information System (INIS)

    Wilson, J.M.

    1992-01-01

    The Outer Continental Shelf (OCS) Environmental Studies Program was initiated in 1973 under the Bureau of Land Management by the Secretary of the Interior. The Purpose of the program was to conduct studies needed to predict, assess and manage impacts on the human, marine and coastal environments of the OCS and nearshore areas that may be affected by oil and gas activities. The narrative summary updates the version printed in 1986, which covered studies managed by the MMS in the Atlantic OCS region between 1973 and 1985. Descriptions of the study results are divided into the following categories: baseline studies and environmental inventories, biology/ecology, drill site monitoring, endangered species, geology/chemistry, oil spill studies, physical oceanography/meteorology, and social and economic studies. Results of each major type of study are subdivided into North Atlantic, Mid-Atlantic, South Atlantic, and multiregional studies in chronological sequence

  18. Final Environmental Assessment: Consolidated Dining Facility at Joint Base McGuire-Dix-Lakehurst, New Jersey

    Science.gov (United States)

    2013-05-01

    intended to ‘provide a cornerstone of integrated mission, services, and recreational activities that is a walkable , convenient, and attractive...Training areas are intended to enhance existing or grow into walkable campuses with barracks, dining facilities, administrative support functions and...preserve natural lands and critical environmental areas, and protect water and ai r quality by encouraging developments that are mixed-use, walkable

  19. Final Environmental Assessment for Shared Use Paths (SUP), Eglin Air Force Base, Florida

    Science.gov (United States)

    2011-07-01

    social effects...Use Path (SUP)Environmental AssesmentEglin Air Force Base, Florida "/ "/ "/ "/ "/ "/ "/ "/ "/ "/ "/ Eighth StEglin Blvd Memoria l Dr Griffin Way...StEglin Blvd Memoria l Dr Griffin Way Nomad Way Eglin B lvd FL HW Y 8 5 Chinquapin Dr Perimeter Rd VALPARISO Park Tunn el Taxiw ay PT A rea Com miss

  20. Final Environmental Assessment for Constructing a Magnet School at Laughlin Air Force Base, Texas

    Science.gov (United States)

    2016-10-01

    people benefits , or subjecting people to discrimination or disproportionately high environmental health or safety risks. In constructing and operating...the proposed action would not have significant impacts on the following resources: air quality, noise, safety and occupational health , biological...Construction noise at the residences nearest the site would be approximately 88 dB and could be perceived as intrusive by people outdoors at those residences

  1. Final Environmental Assessment: Demolition/Restoration of Ipswich Antenna Test Facility

    Science.gov (United States)

    2012-05-01

    sourc--es \\ Veta quantified b y using fual oU e onsu.mption from the-last full yesr of use ( CY20 1 0). Buildings S-3, S-5, and S-15 ware haated b y #2...the environment. E nvironmental Consequences Environmental analyses focused on the following areas: land use, socioeconomics, utilities...the wetland as possib I e . In addition the Conservation Commission may impose additional requirements such as: staking the wetland boundaries

  2. Final Environmental Assessment and Finding of No Significant Impact Proposed Running Track Hanscom AFB, Bedford, Massachusetts

    Science.gov (United States)

    2004-09-01

    agency response letters are included in Appendix B. Mr. Robert W. GoUedge, Jr. Commissioner, MADEP: No Comment Mr. Garry C. Waldeck MADEP...Headquarters: -Requested copy of Environmental Assessment ( No comment ). Mr. David Shakespeare MADEP - BWSC: No Comment Mr. James Sprague , ·. MADEP, NERO...Division of Watershed Management - Wetlands Program: No Comment · Mr. John Zajac MADEP, NERO Division ofWatershed Management: No Comment Mr. Todd

  3. Environmental impact statements concerning final deposition of spent nuclear fuels a.o

    International Nuclear Information System (INIS)

    Larsen, B.; Schibbye, K.; Andersson, Johan; Norrby, S.; Timm, T.; Haegg, C.; Johansson, Gunnar

    1995-02-01

    Five governmental authorities concerned in licensing a swedish nuclear waste repository have outlined recommendations for what should be covered by an environmental impact statement, i.e. defined which laws should be applied, tried to develop a consensus on the handling the EIS in the licensing procedure, to identify potential problems due to prevailing (or non-existing) rules on EIS especially concerning roles and conflicts of objective

  4. Technical procedures for ecology: Environmental field program, Deaf Smith County Site, Texas: Final draft

    International Nuclear Information System (INIS)

    1987-08-01

    This volume contains Technical Procedures pursuant to the Land Use Site Study Plan including walkover surveys for threatened, endangered, or candidate species; vegetation classification and mapping; reclamation planning; wetland and floodplain determination and characterization of playas; wildlife habitat mapping methods; mammal sampling; bird survey methods; reptile and amphibian survey methods; preexisting environmental; stress and disturbance studies methods; voucher specimens for plants; and voucher specimens to wildlife. 9 refs., 5 figs., 1 tab

  5. Concerted action on assessment of health and environmental impacts. Modeller and experimentalists' forum: final report

    International Nuclear Information System (INIS)

    Simmonds, J.

    2000-07-01

    The behaviour of radionuclides in the environment and the associated risks have to be determined through a combination of experimental and modelling studies. Modelling systems, such as those developed collaboratively in the European Union, are required: (a) to determine the potential consequences of accidental releases, (b) to help in emergency planning, (c) to determine the radiological impact of proposed routine radionuclide releases. Various experimental and environmental monitoring data are used as an input to such systems both directly through the choice of parameter values and indirectly through validation of the models. It is important to establish good contacts between the modelling and experimental communities to contribute towards the harmonisation of environmental modelling and to contribute to the maintenance of the European Commission modelling systems as state of the art. Such contacts are also beneficial in directing future experimental research and modelling programmes. The aspects of environmental transfer considered in this project are terrestrial food chains, external irradiation, resuspension, atmospheric dispersion, and aquatic transfer. To fulfil the objectives of the project, NRPB took the lead, with assistance from the other partners, in organising and hosting regular meetings of researchers in the experimental and modelling communities, setting key issues for discussion at each meeting, and drawing together the conclusions of each meeting. The emphasis of the meetings was on the adequacy of the three principal EC-sponsored computing systems, COSYMA and PC-COSYMA (probabilistic risk assessment systems), PC-CREAM (system for assessing the consequences of routine releases) and RODOS (the EC decision aiding system for emergency response). The meetings considered whether these systems make adequate use of the available experimental data and findings on environmental contamination and transfer. This aim of this study was to consider the models

  6. Final Environmental Assessment for Stormwater Drainage Project on F. E. Warren Air Force Base, Wyoming

    Science.gov (United States)

    2005-05-01

    Taxidea taxus), raccoon (Procyon lotor hirtus), porcupine (Erethizon dorsatum), red fox (Vulpes vulpes), coyote (Canus latrans), and Wyoming ground...squirrel (Spermophilus elegans). A relatively large herd of pronghorn antelope inhabits the base. Although the pronghorn on the installation are a...part of the larger Iron Mountain herd , most reside on the installation year-round. The Storm Water Drainage Project, Draft Environmental Assessment

  7. Determining ''Best Practicable Environmental Options'' for final waste disposal of radioactive waste

    International Nuclear Information System (INIS)

    Smith, Graham

    1999-01-01

    This presentation discusses some ideas on what the Best Practical Environmental Option (BPEO) process should include. A BPEO study to help develop a radioactive waste management strategy should not only look at post-closure safety of a facility. In the UK there was a 1986 Study of BPEOs for management of low and intermediate level radioactive wastes. This study tried to answer important questions such as (1) What are the practical options, (2) Which wastes should go to shallow burial, (3) Which wastes should go to sea disposal, (4) How does storage compare with disposal and (5) What are the cost and environmental trade-offs. The presentation discusses what was done to answer the questions. The BPEO Study resulted in major improved effort to characterise waste, much greater quantitative understanding of where and when the real costs, and environmental and radiological impacts arise. All options would be useful within a national strategy. But there was clearly a need for resolution of political acceptance problems, integration of policy with other hazardous waste management, and stronger legal framework

  8. Final Report: African Power/Energy and Environmental Development Plan, July 1, 1994 - August 21, 1999

    Energy Technology Data Exchange (ETDEWEB)

    Butler, John M.

    1999-08-21

    In 1994 AEF signed a Cooperative Agreement with DOE to address a program called the African Power /Energy and Environmental Development Plan. The Program initially addressed five area: (1) Historical Black Colleges and Universities Energy/Environmental Program; (2) The Department of Energy and United States Private Industry Africa Program; (3) The Annual United States Energy Study Tour; (4) South African Training Program, and (5) South African Environmental Program. The programs were implemented in conjunction with DOE, institutions, agencies and the private sector support in the USA and within African nations. AEF has worked with government and technical representatives from 13 African nations and expanded the program to address sponsorship of South African students in Historical Black Colleges and Universities, supporting DOE trade missions through participation and planning, and giving presentations in the U.S., and Africa regarding business opportunities in the African energy sector. The programs implemented have also opened doors for the US private sector to seek business opportunities in Africa and for African nations to gain exposure to US products and services.

  9. Defense Waste Processing Facility: Savannah River Plant, Aiken, SC. Final environmental impact statement

    International Nuclear Information System (INIS)

    1982-02-01

    The purpose of this Environmental Impact Statement (EIS) is to provide environmental input into both the selection of an appropriate strategy for the permanent disposal of the high-level radioactive waste (HLW) currently stored at the Savannah River Plant (SRP) and the subsequent decision to construct and operate a Defense Waste Processing Facility (DWPF) at the SRP site. The SRP is a major US Department of Envgy (DOE) installation for the production of nuclear materials for national defense. Approximately 83 x 10 3 m 3 (22 million gal) of HLW currently are stored in tanks at the SRP site. The proposed DWPF would process the liquid HLW generated by SRP operations into a stable form for ultimate disposal. This EIS assesses the effects of the proposed immobilization project on land use, air quality, water quality, ecological systems, health risk, cultural resources, endangered species, wetlands protection, resource depletion, and regional social and economic systems. The radiological and nonradiological risks of transporting the immobilized wastes are assessed. The environmental impacts of disposal alternatives have recently been evaluated in a previous EIS and are therefore only summarized in this EIS

  10. Notice of availability, final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project

    International Nuclear Information System (INIS)

    1999-01-01

    BP Exploration (Alaska) Inc. (BPXA) is proposing to develop the Northstar Unit, located approximately 6 miles offshore of Point Storkensen in the Alaskan Beaufort Sea. BPXA's proposed action is a self-contained development/production facility located on a reconstructed gravel island in 39 feet of water. Also proposed is construction of two buried subsea pipelines between the island and shoreline to transport oil and gas. The pipelines would connect with onshore facilities and the Trans Alaska Pipeline System (TAPS). In response to BPXA's submittal of a permit application under Section 10 of the Rivers and Harbors Act, Section 404 of the Clean Water Act, and Section 103 of the Marine Protection Research and Sanctuaries Act, the US Army Corps of engineers, Alaska District (Corps) determined that issuance of a permit for BPXA's proposed project constituted a major federal action that may significantly affect the quality of the human environment pursuant to the National Environmental Policy Act (NEPA). In addition, the US Environmental Protection Agency (EPA), determined under provisions of the Clean Water Act and 40 CFR Part 6 Subpart F that permitting by the EPA for BPXA's proposed project also constituted a major federal action that my significantly affect the quality of the human environment. As a result, preparation of an Environmental Impact Statement (EIS) under NEPA was undertaken to identify and evaluate a range of reasonable alternatives and evaluate the potential effects the alternates, including BPXA's proposed project, may have on the human environment

  11. SIMS study on statistics and environmental factors in health. Final technical report to Department of Energy

    International Nuclear Information System (INIS)

    1982-07-01

    This final technical report to DOE consists of five individual technical reports and one working paper by members of the SIMS Study at Stanford. Research topics include testing goodness-of-fit for the distribution of errors in regression models, mathematical models of cancer and their use in risk assessment, pollutant standards index (Psi), osteosarcomas among beagles exposed to 239 Plutonium, air pollution and respiratory disease, and models of human exposure to air pollution. Individual summaries of the six reports are indexed separately

  12. Final Environmental Assessment For Proposed Family Campground Expansion Maxwell Air Force Base, Montgomery County, Alabama

    Science.gov (United States)

    2013-03-27

    during Final EA preparation. Providing private address information with your comment is voluntary and such personal information will be kept confidential ...commercially available. 4.2 Commercial kitchen appliances shall be either ENERGY STAR®, FEMP designated or qualified for California Utilities Rebate Program... kitchen pre-rinse spray valves (PRSV) with low flow nozzles) i. Install or convert to only ENERGY STAR® Commercial Dishwashers j. Install or convert to

  13. Generic maintenance immunosuppression in solid organ transplant recipients.

    Science.gov (United States)

    Ensor, Christopher R; Trofe-Clark, Jennifer; Gabardi, Steven; McDevitt-Potter, Lisa M; Shullo, Michael A

    2011-11-01

    Survival after solid organ transplantation has increased in the era of tacrolimus and mycophenolate. This increased survival could be due in part to the broad clinical use of these potent and specific agents for maintenance immunosuppression. These drugs have enhanced specificity and potency for T and B lymphocytes compared with their predecessors, cyclosporine and azathioprine. Between 2008 and 2010, the United States Food and Drug Administration approved several generic formulations of both tacrolimus and mycophenolate mofetil. Deciding whether generic products can be safely substituted for the innovator product is a clinical dilemma similar to that which occurred when generic formulations of cyclosporine became available. We describe the concerns regarding generic immunosuppression use, summarize expert opinion and consensus statements in transplantation, analyze the potential impact of generic substitution, and provide estimates of populations affected based on generic drug market penetration. Formulary considerations such as cost, availability, and potential drug ordering and drug selection errors are described, and transplant coordinator and patient perspectives are reviewed. Finally, general recommendations about the use of generic maintenance immunosuppression in solid organ transplant recipients are provided. Although more research is needed to confirm clinical and therapeutic equivalence and pharmacoeconomic benefit, generic immunosuppressants can be safely substituted for innovator products as long as patients consistently receive the same product, patients and clinicians are aware of when substitutions occur, and enhanced therapeutic drug monitoring is provided during the transition.

  14. INL Site Portion of the April 1995 Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Mamagement Programmatic Final Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2005-06-30

    In April 1995, the Department of Energy (DOE) and the Department of the Navy, as a cooperating agency, issued the Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact Statement (1995 EIS). The 1995 EIS analyzed alternatives for managing The Department's existing and reasonably foreseeable inventories of spent nuclear fuel through the year 2035. It also included a detailed analysis of environmental restoration and waste management activities at the Idaho National Engineering and Environmental Laboratory (INEEL). The analysis supported facility-specific decisions regarding new, continued, or planned environmental restoration and waste management operations. The Record of Decision (ROD) was signed in June 1995 and amended in February 1996. It documented a number of projects or activities that would be implemented as a result of decisions regarding INL Site operations. In addition to the decisions that were made, decisions on a number of projects were deferred or projects have been canceled. DOE National Environmental Policy Act (NEPA) implementing procedures (found in 10 CFR Part 1 021.330(d)) require that a Supplement Analysis of site-wide EISs be done every five years to determine whether the site-wide EIS remains adequate. While the 1995 EIS was not a true site-wide EIS in that several programs were not included, most notably reactor operations, this method was used to evaluate the adequacy of the 1995 EIS. The decision to perform a Supplement Analysis was supported by the multi-program aspect of the 1995 EIS in conjunction with the spirit of the requirement for periodic review. The purpose of the SA is to determine if there have been changes in the basis upon which an EIS was prepared. This provides input for an evaluation of the continued adequacy of the EIS in light of those changes (i.e., whether there are substantial changes in the proposed

  15. Final environmental statement related to the operation of Midland Plant, Units 1 and 2. Docket Nos. 50-329 and 50-330, Consumers Power Company

    International Nuclear Information System (INIS)

    1982-07-01

    This final environmental statement contains the second assessment of the environmental impact associated with operation of the Midland Plant, Units 1 and 2 pursuant to the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51, as amended, of the NRC's regulations. This statement examines: the purpose and need for the Midland project, alternatives to the project, the affected environment, environment consequences and mitigating actions, and environmental and economic benefits and costs

  16. 75 FR 47856 - Nebraska Public Power District: Cooper Nuclear Station; Notice of Availability of the Final...

    Science.gov (United States)

    2010-08-09

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-298; NRC-2008-0617] Nebraska Public Power District: Cooper Nuclear Station; Notice of Availability of the Final Supplement 41 to the Generic Environmental... of operating licenses DPR-46 for an additional 20 years of operation for the Cooper Nuclear Station...

  17. Advances on generic exemption levels and generic clearance levels in the argentinean regulatory field

    International Nuclear Information System (INIS)

    Muñiz, C.C.; Bossio, M.C.

    2011-01-01

    With the aim of optimizing the regulatory effort in Argentina, the Nuclear Regulatory Authority (ARN) evaluated two worldwide concepts used in the radioactive waste management field: “Generic Exemption Levels” and “Generic Clearance Levels”. The objective of this paper is to present the progress made in the past two years in relation to these topics and to present the results of the specific requests received from users of radioactive material. Since the approval of both Generic Levels, the ARN received two exemption requests. The first one, regarding the practice of dismantling lighting rods with 241 Am. The other case regards the international trade, distribution, usage and final disposal of lighting products with radioactive material ( 85 Kr and 232 Th). Concerning clearance, there has not been any request yet. However, in the future the ARN expects to receive this kind of requests from nuclear power plants and other facilities related to the nuclear fuel cycle. (authors) [es

  18. A generic coordinate system and a set of generic variables for MFE database

    International Nuclear Information System (INIS)

    Miner, W.H. Jr.; Ross, D.W.; Solano, E.R.; Valanju, P.M.; Wiley, J.C.

    1993-01-01

    Over the last several years, profile data from nine different tokamaks have been stored in the magnetic fusion energy database (MFEDB). These data sets have come from a variety of sources and most are given in different coordinate systems. In order to attempt any intermachine analysis, it is convenient to transform these data sets into one generic coordinate system and to choose a uniform set of variable names. The authors describe the data sets from each tokamak indicating the source of the data and the coordinate system in which it is given. Next, they discuss the generic coordinate that has been adopted and show how it is implemented for each tokamak. Finally, the generic naming convention that has been adopted is discussed. It follows closely that which was used by Christiansen et al. for the ITER Global Energy Confinement H-Mode Database. For further clarification, they discuss the characteristics of the magnetic geometry given a Fourier representation of the magnetic equilibria

  19. Final environmental statement related to the operation of Clinton Power Station, Unit No. 1. Docket No. 50-461

    International Nuclear Information System (INIS)

    1982-05-01

    This final environmental statement contains the second assessment of the environmental impact associated with operation of Clinton Power Station Unit 1 pursuant to the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51, as amended, of the NRC's regulations. This statement examines: the affected environment, environmental consequences and mitigating actions, and environmental and economic benefits and costs. Land-use and terrestrial- and aquatic-ecological impacts will be small. Air-quality impacts will also be small. However, steam fog from the station's cooling lake has the potential for reducing visibility over nearby roads and bridges. A fog-monitoring program for roads and ridges near the lake has been recommended. Impacts to historic and prehistoric sites will be negligible. Chemical discharges to Lake Clinton and Salt Creek are expected to have no appreciable impacts on water quality under normal conditions and will be required to meet conditions of the station's NPDES permit. The hydrothermal analyses indicate that under certain meteorological conditions (1-in-50-year drought), the plant would have to be operated at reduced power levels in order to meet the thermal standards established by the Illinois Pollution Control Board Order PCB 81-82. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission line facilties should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. Contentions associated with environmental issues accepted during the operating-license hearing are related to assessment of effects of low-level radiation. The net socioeconomic effects of the project will be beneficial. The action called for is the issuance of an operating license for Unit 1 of Clinton

  20. Decommissioning of eight surplus production reactors at the Hanford Site, Richland, Washington. Addendum (Final Environmental Impact Statement)

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-01

    The first section of this volume summarizes the content of the draft environmental impact statement (DEIS) and this Addendum, which together constitute the final environmental impact statement (FEIS) prepared on the decommissioning of eight surplus plutonium production reactors at Hanford. The FEIS consists of two volumes. The first volume is the DEIS as written. The second volume (this Addendum) consists of a summary; Chapter 9, which contains comments on the DEIS and provides DOE`s responses to the comments; Appendix F, which provides additional health effects information; Appendix K, which contains costs of decommissioning in 1990 dollars; Appendix L, which contains additional graphite leaching data; Appendix M, which contains a discussion of accident scenarios; Appendix N, which contains errata; and Appendix 0, which contains reproductions of the letters, transcripts, and exhibits that constitute the record for the public comment period.

  1. Burlington Bottoms Wildlife Mitigation Project. Final Environmental Assessment/Management Plan and Finding of No Significant Impact.

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property.

  2. Burlington Bottoms Wildlife Mitigation Project. Final environmental assessment/management plan and finding of no significant impact

    International Nuclear Information System (INIS)

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property

  3. Science To Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards; FINAL

    International Nuclear Information System (INIS)

    Bredt, Paul R; Brockman, Fred J; Grate, Jay W; Hess, Nancy J; Meyer, Philip D; Murray, Christopher J; Pfund, David M; Su, Yali; Thornton, Edward C; Weber, William J; Zachara, John M

    2001-01-01

    Pacific Northwest National Laboratory (PNNL) was awarded ten Environmental Management Science Program (EMSP) research grants in fiscal year 1996, six in fiscal year 1997, nine in fiscal year 1998, seven in fiscal year 1999, and five in fiscal year 2000. All of the fiscal year 1996 award projects have published final reports. The 1997 and 1998 award projects have been completed or are nearing completion. Final reports for these awards will be published, so their annual updates will not be included in this document. This section summarizes how each of the 1999 and 2000 grants address significant U.S. Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. The 1999 and 2000 EMSP awards at PNNL are focused primarily in two areas: Tank Waste Remediation, and Soil and Groundwater Cleanup

  4. Final Environmental Impact Statement for the construction and operation of Claiborne Enrichment Center, Homer, Louisiana (Docket No. 70-3070)

    Energy Technology Data Exchange (ETDEWEB)

    Zeitoun, A. [Science Applications International Corp., Germantown, MD (United States)

    1994-08-01

    This two-volume Final Environmental Impact Statement (FEIS) was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA). Volume 1 contains the assessment of the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana, by Louisiana Energy Services, LP. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF{sub 6}, using a proven centrifuge technology. Included in the assessment are construction, both normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning (D&D)- of the site. Issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment. The FEIS supports issuance of a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility.

  5. Radiological health review of the final environmental impact statement. Waste Isolation Pilot Plant. Volumes 1 and 2

    International Nuclear Information System (INIS)

    1981-01-01

    Pursuant to the requirements of the National Environmental Policy Act of 1969, the Department of Energy has provided in the Final Environmental Impact Statement (FEIS) a comprehensive review of the potential radiological impact of the proposed Waste Isolation Pilot Plant, referred to in the FEIS as, the authorized alternative. The EEG has reviewed this document to determine (a) the changes made in comparison with the Draft Environmental Impact Statement (DEIS); (b) the adequacy of the DOE's evaluation of the potential radiological impact; (c) the thoroughness of the DOE's response to the comments of the EEG on the DEIS; and (d) other issues which should be addressed by DOE more fully prior to beginning construction of the WIPP. Based on our review of the FEIS, the Department of Energy has incorporated and addressed the majority of the concerns, questions and recommendations that the EEG provided to them in our August 1979 review of the Draft Environmental Impact Statement on WIPP and the FEIS provides a generally satisfactory evaluation of the potential radiological impact. There are, however, a number of areas that have yet to be adequately treated by DOE and should be acted upon and resolved prior to beginning construction of the WIPP. The more important issues are included and are discussed in more detail in our December 8, 1980 and January 15, 1981 comments on the FEIS

  6. Final Environmental Statement related to the decommissioning of the Rare Earths Facility, West Chicago, Illinois. Docket No. 40-2061

    International Nuclear Information System (INIS)

    1983-05-01

    This Final Environmental Statement is issued by the US Nuclear Regulatory Commission in response to the plan proposed by Kerr-McGee Chemical Corporation for the decommissioning of their Rare Earths Facility located in West Chicago, Illinois. The statement considers the Kerr-McGee preferred plan and various alternatives to that plan. The action proposed by the Commission is the renewal of the Kerr-McGee license to allow stabilization of wastes onsite and for possession of the wastes under license for an indeterminate time. The license could be terminated at a later date if certain specified requirements were met

  7. Final environmental statement related to the operation of the Teton Uranium ISL Project (Docket No). 40-8781

    International Nuclear Information System (INIS)

    1983-08-01

    This Final Environmental Impact Statement is issued by the US Nuclear Regulatory Commission in response to the request by Teton Exploration Drilling, Inc. for the issuance of an NRC Source and Byproduct Material License authorizing operation of the proposed Teton Project to mine uranium in situ by injecting a carbonate/bicarbonate lixiviant into the ore body. The statement considers: (1) alternative of no licensing action, (2) alternative energy sources, and (3) alternatives if uranium ore is mined and refined on the site. The proposed action is to grant a Source and Byproduct Material License to the applicant subject to the stipulated license condition

  8. National Spill Control School. A pilot program in environmental training. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Oberholtzer, G.R.; Acuff, J.T.

    1980-01-01

    Increased environmental awareness and the amended Federal Water Pollution Control Act of 1972 required an increased level of expertise by the American Public in the field of oil spill prevention and control. The National Spill Control School was created at Corpus Christi State University to help meet this need. Drawing on the talents of a nationwide sample of experts in this field, the project team created a unique management oriented course. A review of the origination and experiences of two years of classes of this pilot program is provided in this report.

  9. Environmental Assessment for decontaminating and decommissioning the General Atomics Hot Cell Facility. Final [report

    International Nuclear Information System (INIS)

    1995-08-01

    This EA evaluates the proposed action to decontaminate and decommission GA's hot cell facility in northern San Diego, CA. This facility has been used for DOE and commercial nuclear R ampersand D for > 30 years. About 30,000 cubic feet of decontamination debris and up to 50,000 cubic feet of contaminated soil are to be removed. Low-level radioactive waste would be shipped for disposal. It was determined that the proposal does not constitute a major federal action significantly affecting the human environment according to NEPA; therefore, a finding of no significant impact is made, and an environmental impact statement is not required

  10. Final Environmental Assessment: Central Issue Facility at Joint Base McGuire-Dix-Lakehurst, New Jersey

    Science.gov (United States)

    2013-05-01

    NJDEP assumed responsibility in most of NJ for the Federal wetlands permitting program, also known as the "Federal 404 program" because it stems ...shrubs; nests are made of herbaceous stems , leaves, grasses, and mud (Roth et al. 1996). JB MDL sent informal consultation letters to the USFWS and the...8217Uary 28, Jc• JJ St•bjccr: Environmental Asses)mcms CEAs) (or 1hc Centrul lssuo Faci lity an<l Consolidated Dluine F~ cll i ty Ul Joint A~ MeCuirc·Dix•LO

  11. Final Programmatic Environmental Impact Statement for stockpile stewardship and management: Volume 1

    International Nuclear Information System (INIS)

    1996-09-01

    The Department of Energy (DOE) has been directed by the President and Congress to maintain the safety and reliability of the reduced nuclear weapons stockpile in the absence of underground nuclear testing. In order to fulfill that responsibility, DOE has developed Stockpile Stewardship and Maintenance Program to provide a single highly integrated technical program for maintaining the continued safety and reliability of the nuclear stockpile. The Stockpile Stewardship and Management Program Programmatic Environmental Impact Statement (PEIS) describes and analyzes alternative ways to implement the proposed actions for the Stockpile Stewardship and Management Program. This document contains Volume I of the PEIS

  12. Environmental Assessment for decontaminating and decommissioning the General Atomics Hot Cell Facility. Final [report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This EA evaluates the proposed action to decontaminate and decommission GA`s hot cell facility in northern San Diego, CA. This facility has been used for DOE and commercial nuclear R&D for > 30 years. About 30,000 cubic feet of decontamination debris and up to 50,000 cubic feet of contaminated soil are to be removed. Low-level radioactive waste would be shipped for disposal. It was determined that the proposal does not constitute a major federal action significantly affecting the human environment according to NEPA; therefore, a finding of no significant impact is made, and an environmental impact statement is not required.

  13. High Performance Fuel Laboratory, Hanford Reservation, Richland, Washington. Final environmental impact statement

    International Nuclear Information System (INIS)

    1977-09-01

    The High Performance Fuel Laboratory (HPFL) will provide pilot scale tests of manufacturing processes, equipment, and handling systems and of accountability and safeguards, methods, and equipment while keeping radiological and chemical exposures of the workers, public, and environment at the lowest practicable levels. The experience gained from designing, constructing and operating the HPFL can be used in future commitments to commercial fuel fabrication plants in the late 1980s and beyond for processing of nuclear fuel. The HPFL site is located in the 400 Area of the 559-square mile, federally owned Hanford Reservation. This environmental impact statement considers effects of the HPFL under normal conditions and in the event of an accident

  14. Environmental program audit: Portsmouth Uranium Enrichment Complex, Piketon, Ohio. Final report

    International Nuclear Information System (INIS)

    Smith, W.M.

    1985-01-01

    The audit was performed by observing operations, inspecting facilities and equipment, examining monitoring procedures and data, and evaluating compliance with applicable DOE Orders and federal and state regulations. On the basis of available information, no imminent danger to public health or safety was disclosed by the audit. Wastewater treatment facilities are well operated, and there appears to be adequate characterization of current hazardous waste. Similarly, regulatory compliance with NPDES surface water monitoring and discharge requirements is satisfactory. Specific deficiencies in the environmental management program are defined for improvement. These areas include the monitoring network and compliance with air quality standards, water quality standards, waste disposal, and record keeping

  15. Uranium development in the San Juan Basin region: a report on environmental issues. Final edition

    International Nuclear Information System (INIS)

    1980-01-01

    The goal of this study is to provide a regional analysis of the effect of uranium development on the human and natural environment of northwest New Mexico from the present until the year 2000. This report contains comments on the published draft of this study from representatives of federal and state agencies, public interest groups, local governments, leading citizens, and the uranium industry. Many of the comments led to substantial changes in the text and were carefully considered in the final edition of the study

  16. Advertising and generic market entry.

    Science.gov (United States)

    Königbauer, Ingrid

    2007-03-01

    The effect of purely persuasive advertising on generic market entry and social welfare is analysed. An incumbent has the possibility to invest in advertising which affects the prescribing physician's perceived relative qualities of the brand-name and the generic version of the drug. Advertising creates product differentiation and can induce generic market entry which is deterred without differentiation due to strong Bertrand competition. However, over-investment in advertising can deter generic market entry under certain conditions and reduces welfare as compared to accommodated market entry.

  17. NET 40 Generics Beginner's Guide

    CERN Document Server

    Mukherjee, Sudipta

    2012-01-01

    This is a concise, practical guide that will help you learn Generics in .NET, with lots of real world and fun-to-build examples and clear explanations. It is packed with screenshots to aid your understanding of the process. This book is aimed at beginners in Generics. It assumes some working knowledge of C# , but it isn't mandatory. The following would get the most use out of the book: Newbie C# developers struggling with Generics. Experienced C++ and Java Programmers who are migrating to C# and looking for an alternative to other generic frameworks like STL and JCF would find this book handy.

  18. Evaluation of environmental qualification period for Conax electrical penetration assemblies. Final report

    International Nuclear Information System (INIS)

    Doroshuk, B.; Hager, M.; Brown, R.

    1995-05-01

    This report evaluates the environmental qualification period of Conax electrical penetration assemblies (EPAs) for extension from forty (40) years to sixty (60) years. The evaluation was performed based on a review of Conax EPAs supplied to Baltimore Gas ampersand Electric's (BGE) Calvert Cliffs Nuclear Power Plant Units 1 and 2. The report has been prepared so that it may be of use to any utility involved in the extension of the environmental qualification period for Conax EPAs installed in their plant(s). The report includes a section on the strategy which was developed for the effort to extend the qualified lives of the Conax EPAs. A review of documentation and plant conditions specific to BGE is included in the report to demonstrate the methodology. The documentation included qualification testing performed by Conax of the materials of construction of the EPA models. The plant conditions reviewed included both normal and accident environments, both of which are specific to Calvert Cliffs Nuclear Power Plant Units 1 and 2. This report can be used as a guide in the evaluation of similar installations of Conax electrical penetration assemblies in other nuclear power plants by applying the methodologies used herein in conjunction with the plant specific test reports, materials, and conditions

  19. Washington Wildlife Mitigation Projects : Final Programmatic Environmental Assessment and Finding of No Significant Impact.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Washington (State). Dept. of Fish and Wildlife.

    1996-08-01

    Bonneville Power Administration (BPA) proposes to fund the portion of the Washington Wildlife Mitigation Agreement (Agreement) pertaining to wildlife habitat mitigation projects to be undertaken in a cooperative effort with the Washington Department of Fish and Wildlife (WDFW). This Agreement serves to establish a monetary budget funded by BPA for projects proposed by Washington Wildlife Coalition members and approved by BPA to protect, mitigate, and improve wildlife and/or wildlife habitat within the State of Washington that has been affected by the construction of Federal dams along the Columbia River. This Environmental Assessment examines the potential environmental effects of acquiring and/or improving wildlife habitat within five different project areas. These project areas are located throughout Grant County and in parts of Okanogan, Douglas, Adams, Franklin, Kittias, Yakima, and Benton Counties. The multiple projects would involve varying combinations of five proposed site-specific activities (habitat improvement, operation and maintenance, monitoring and evaluation, access and recreation management, and cultural resource management). All required Federal, State, and tribal coordination, permits and/or approvals would be obtained prior to ground-disturbing activities.

  20. Final Project Summary Report Bechtel Nevada and Fiberchem Environmental, Inc., Cooperative Research and Technology Development Project

    Energy Technology Data Exchange (ETDEWEB)

    R. J. Pollina

    1999-04-01

    This is a report summarizing work on a small project dedicated to adapting a new chemical sensing platform for the US Department of Energy and its customers. At the same time and in the spirit of technology transfer, FCI Environmental, Inc., would receive technical support in the form of expertise from the US Department of Energy to assist in developing this product. The sensor is a hybrid integrated-circuit, optical waveguide, chemical sensor that is patented by FCI Environmental, Inc., and manufactured under license by Texas Instruments, Inc. A down-hole penetrometer probe was designed for use in hot, 60 C, hydrocarbon-saturated, saline environment at a depth of 200 feet. The probe design includes three chemical sensing, hybrid integrated-circuits with chemical reference and measurement channels, a water seal, output electronics, and a removable measurement head for replacement in the field. A hand-held chemical detector prototype--containing a hybrid integrated-circuit chemical sensor with reference channel, user alarm, and level display--was designed and constructed, and a software interface developed to operate the hand-held sensor interfaced with a laboratory data acquisition system.

  1. Final report on fiscal year 1992 activities for the environmental monitors line-loss study

    International Nuclear Information System (INIS)

    Kenoyer, J.L.

    1993-01-01

    The work performed on this Environmental Monitors Line-Loss Study has been performed under Contract Numbers MLW-SVV-073750 and MFH-SVV-207554. Work on the task was initiated mid-December 1991, and this report documents and summarizes the work performed through January 18, 1993. The sections included in this report summarize the work performed on the Environmental Monitors Line-Loss Study. The sections included in this report are arranged to reflect individual sub-tasks and include: descriptions of measurement systems and procedures used to obtain cascade impactor samples and laser spectrometer measurements from multiple stacks and locations; information on data acquisition, analyses, assessment, and software; discussion of the analyses and measurement results from the cascade impactor and laser spectrometer systems and software used; discussion on the development of general test methods and procedures for line-loss determinations; an overall summary and specific conclusions that can be made with regard to efforts performed on this task during FY 1992 and FY 1993. Supporting information for these sections is included in this report as appendices

  2. Proposed IMS infrastructure improvement project, Seward, Alaska. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Environmental Impact Statement (EIS) examines a proposal for improvements at the existing University of Alaska, Fairbanks, Institute of Marine Science (IMS), Seward Marine Center. The Exxon Valdez Oil Spill (EVOS) Trustee Council is proposing to improve the existing research infrastructure to enhance the EVOS Trustee Council`s capabilities to study and rehabilitate marine mammals, marine birds, and the ecosystem injured by the Exxon Valdez oil spill. The analysis in this document focuses on the effects associated with construction and operation of the proposed project and its proposed alternatives. The EIS gives a detailed description of all major elements of the proposed project and its alternatives; identifies resources of major concern that were raised during the scoping process; describes the environmental background conditions of those resources; defines and analyzes the potential effects of the proposed project and its alternatives on these conditions; and identifies mitigating measures that are part of the project design as well as those proposed to minimize or reduce the adverse effects. Included in the EIS are written and oral comments received during the public comment period.

  3. Final environmental impact statement. Management of commercially generated radioactive waste. Volume 2. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    1980-10-01

    This EIS analyzes the significant environmental impacts that could occur if various technologies for management and disposal of high-level and transuranic wastes from commercial nuclear power reactors were to be developed and implemented. This EIS will serve as the environmental input for the decision on which technology, or technologies, will be emphasized in further research and development activities in the commercial waste management program. The action proposed in this EIS is to (1) adopt a national strategy to develop mined geologic repositories for disposal of commercially generated high-level and transuranic radioactive waste (while continuing to examine subseabed and very deep hole disposal as potential backup technologies) and (2) conduct a R and D program to develop such facilities and the necessary technology to ensure the safe long-term containment and isolation of these wastes. The Department has considered in this statement: development of conventionally mined deep geologic repositories for disposal of spent fuel from nuclear power reactors and/or radioactive fuel reprocessing wastes; balanced development of several alternative disposal methods; and no waste disposal action. This volume contains appendices of supplementary data on waste management systems, geologic disposal, radiological standards, radiation dose calculation models, related health effects, baseline ecology, socio-economic conditions, hazard indices, comparison of defense and commercial wastes, design considerations, and wastes from thorium-based fuel cycle alternatives. (DMC)

  4. Proposed IMS infrastructure improvement project, Seward, Alaska. Final environmental impact statement

    International Nuclear Information System (INIS)

    1994-09-01

    This Environmental Impact Statement (EIS) examines a proposal for improvements at the existing University of Alaska, Fairbanks, Institute of Marine Science (IMS), Seward Marine Center. The Exxon Valdez Oil Spill (EVOS) Trustee Council is proposing to improve the existing research infrastructure to enhance the EVOS Trustee Council's capabilities to study and rehabilitate marine mammals, marine birds, and the ecosystem injured by the Exxon Valdez oil spill. The analysis in this document focuses on the effects associated with construction and operation of the proposed project and its proposed alternatives. The EIS gives a detailed description of all major elements of the proposed project and its alternatives; identifies resources of major concern that were raised during the scoping process; describes the environmental background conditions of those resources; defines and analyzes the potential effects of the proposed project and its alternatives on these conditions; and identifies mitigating measures that are part of the project design as well as those proposed to minimize or reduce the adverse effects. Included in the EIS are written and oral comments received during the public comment period

  5. Final environmental assessment: TRU waste drum staging building, Technical Area 55, Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    1996-01-01

    Much of the US Department of Energy's (DOE's) research on plutonium metallurgy and plutonium processing is performed at Los Alamos National Laboratory (LANL), in Los Alamos, New Mexico. LANL's main facility for plutonium research is the Plutonium Facility, also referred to as Technical Area 55 (TA-55). The main laboratory building for plutonium work within the Plutonium Facility (TA-55) is the Plutonium Facility Building 4, or PF-4. This Environmental Assessment (EA) analyzes the potential environmental effects that would be expected to occur if DOE were to stage sealed containers of transuranic (TRU) and TRU mixed waste in a support building at the Plutonium Facility (TA-55) that is adjacent to PF-4. At present, the waste containers are staged in the basement of PF-4. The proposed project is to convert an existing support structure (Building 185), a prefabricated metal building on a concrete foundation, and operate it as a temporary staging facility for sealed containers of solid TRU and TRU mixed waste. The TRU and TRU mixed wastes would be contained in sealed 55-gallon drums and standard waste boxes as they await approval to be transported to TA-54. The containers would then be transported to a longer term TRU waste storage area at TA-54. The TRU wastes are generated from plutonium operations carried out in PF-4. The drum staging building would also be used to store and prepare for use new, empty TRU waste containers

  6. Environmental and health effects review for obscurant graphite flakes. Final report, 1991 July--1993 May

    Energy Technology Data Exchange (ETDEWEB)

    Driver, C.J.; Ligotke, M.W.; Landis, W.G.; Downs, J.L.; Tiller, B.L.; Moore, E.B. Jr.; Cataldo, D.A.

    1993-07-01

    The health and environmental effects of obscurant graphite flakes were reviewed and compared to predicted levels of graphite flake material in the field during typical testing and training scenarios. Graphite flake dispersion and deposition for simulated mechanical and pyrotechnic releases were determined using a modified Gaussian atmospheric plume-dispersion model. The potential for wind resuspension of graphite flakes is controlled by weathering processes and incorporation rates in soil. Chemically, graphite flakes pose little risk to aquatic or terrestrial systems. Mechanical damage to plants and invertebrate and vertebrate organisms from the flakes is also minimal. In humans, the pathological and physiological response to inhaled graphite flake is similar to that induced by nuisance dusts and cause only transient pulmonary changes. Repeated exposure to very high concentrations (such as those near the source generator) may overwhelm the clearance mechanisms of the lung and result in pulmonary damage from the retained particles in unprotected individuals. However, these lesions either resolve with time or are of limited severity. Health effects of mixed aerosols of mixed aerosols of graphite and fog oil are similar to those produced by graphite flakes alone. Environmental impacts of fog oil-coated graphite flakes are not well known.

  7. Washington wildlife mitigation projects. Final programmatic environmental assessment and finding of no significant impact

    International Nuclear Information System (INIS)

    1996-08-01

    Bonneville Power Administration (BPA) proposes to fund the portion of the Washington Wildlife Mitigation Agreement (Agreement) pertaining to wildlife habitat mitigation projects to be undertaken in a cooperative effort with the Washington Department of Fish and Wildlife (WDFW). This Agreement serves to establish a monetary budget funded by BPA for projects proposed by Washington Wildlife Coalition members and approved by BPA to protect, mitigate, and improve wildlife and/or wildlife habitat within the State of Washington that has been affected by the construction of Federal dams along the Columbia River. This Environmental Assessment examines the potential environmental effects of acquiring and/or improving wildlife habitat within five different project areas. These project areas are located throughout Grant County and in parts of Okanogan, Douglas, Adams, Franklin, Kittias, Yakima, and Benton Counties. The multiple projects would involve varying combinations of five proposed site-specific activities (habitat improvement, operation and maintenance, monitoring and evaluation, access and recreation management, and cultural resource management). All required Federal, State, and tribal coordination, permits and/or approvals would be obtained prior to ground-disturbing activities

  8. Project Management Support and Services for the Environmental Restoration and Waste Management. Final report

    International Nuclear Information System (INIS)

    1995-01-01

    The Los Alamos National Laboratory (LANL) Environmental Restoration Technical Support Office (ERTSO) contracted Project Time ampersand Cost, Inc. (PT ampersand C) on 16 November 1992 to provide support services to the US Department of Energy (DOE). ERTSO had traditionally supported the DOE Albuquerque office in the Environmental Restoration and Waste Management Programs and had also supported the Office of Waste Management (EM-30) at DOE Headquarters in Germantown, Maryland. PT ampersand C was requested to provide project management and support services for the DOE as well as liaison and coordination of responses and efforts between various agencies. The primary objective of this work was to continue LANL's technical support role to EM-30 and assist in the development of the COE Cost and Schedule Estimating (CASE) Guide for EM-30. PT ampersand C's objectives, as specified in Section B of the contract, were well met during the duration of the project through the review and comment of various draft documents, trips to DOE sites providing program management support and participating in the training for the EM-30 Cost and Schedule Estimating Guide, drafting memos and scheduling future projects, attending numerous meetings with LANL, DOE and other subcontractors, and providing written observations and recommendations.he results obtained were determined to be satisfactory by both the LANL ERTSO and DOE EM-30 organizations. The objective to further the support from LANL and their associated subcontractor (PT ampersand C) was met. The contract concluded with no outstanding issues

  9. Beaufort Region Environmental Assessment and Monitoring program (BREAM). Final report for 1992/1993

    International Nuclear Information System (INIS)

    Vonk, P.; Duval, W.; Thomas, D.

    1993-01-01

    The Beaufort Region Environmental Assessment and Monitoring (BREAM) program was established to identify environmental research and monitoring priorities related to future hydrocarbon development activities in the Beaufort Sea and Mackenzie Delta region. The activities occurring during the third year of BREAM focused on major oil spills. Three planning meetings were held: a Project Initiation Meeting and technical meetings of the Community-Based Concerns and Catastrophic Oil Spill Working Groups. The initiation meeting had goals that included identifying specific tasks to be completed by the two Working Groups, discussion of contents and scope of materials being prepared for an oil spill workshop, and determining project schedules. The Community-Based Concerns group focused its work on identifying ecological concerns related to oil spills and their cleanup, identifying community-based ecological issues and concerns, and incorporating local and traditional knowledge into the BREAM program. The group suggested changes to the wording of existing impact hypotheses and oil spill scenarios, and recommended changes in a list of valued ecosystem components. The oil spill group reviewed ecological concerns related to oil spills, and reviewed each oil spill scenario and impact hypothesis selected for an interdisciplinary workshop held in February 1993. The workshop evaluated four of the most important oil spill impact hypotheses (offshore platform blowout, river barge spill of diesel fuel, under-ice spill from a pipeline river crossing, and a pipeline spill affecting mammals). Further research and monitoring related to a number of impact hypotheses was recommended by workshop participants. 57 refs., 29 figs., 12 tabs

  10. Final environmental and regulatory assessment of using asphalt as a sealant in mine shafts

    International Nuclear Information System (INIS)

    1987-01-01

    This report discusses the properties of asphalt, the current regulatory status governing asphalt and future regulatory implications which may be pertinent in using asphalt as a waterproof shaft sealant. An understanding of the inherent organic composition of asphalt, an increase in the number of health and environmental research publications conducted on asphalt and an examination of the apparent trend of regulatory agencies toward more stringent environmental regulation governing the use of organic materials suggests asphalt could become regulated at a future time. This would only occur, however, if asphalt was found to conform to the present regulatory definitions of pollutants, contaminants or hazardous substances or if asphalt was included on a regulated substance list. In this regard, the study points out that asphalt contains very low levels of hazardous poly-nuclear aromatics (PNA's). These levels are significantly lower than the levels present in coal tars, a substance known to contain high levels of hazardous PNA's. Asphalt, however, has the inherent potential of producing higher concentrations of PNA's if the adverse condition of cracking should occur during the refinery production stage or on-site preparation of the asphalt. Also, unless existing control technology is applied, emission levels of sulfur dioxide, carbon monoxide, particulates and volatile organic carbons from the on-site preparation facilities could approach the permissible health standard levels of EPA. The study indicates, however, that available literature is limited on these issues

  11. Columbia River System Operation Review final environmental impact statement. Appendix K: Resident fish

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. In this appendix the Resident Fish Work Group (RFWG) has attempted to characterize and evaluate impacts of dam operation on an extremely complex and diverse integrated resource. Not only is this required under the National Environmental Policy Act (NEPA) for SOR, there are resident fish populations that have status under the Federal Endangered Species Act (ESA) or equivalent state regulations (Kootenai River white sturgeon, Snake River white sturgeon, sandroller, shorthead and torrent sculpins, bull trout, westslope cutthroat trout, redband trout, and burbot). The RFWG has also attempted to develop operating alternatives that benefit not only resident fish, but anadromous fish, wildlife, and other human interests as well. The authors have recognized the co-evolution of resident fish, anadromous fish, and other integrated resources in the basin

  12. Final environmental impact statement. Management of commercially generated radioactive waste. Volume 2. Appendices

    International Nuclear Information System (INIS)

    1980-10-01

    This EIS analyzes the significant environmental impacts that could occur if various technologies for management and disposal of high-level and transuranic wastes from commercial nuclear power reactors were to be developed and implemented. This EIS will serve as the environmental input for the decision on which technology, or technologies, will be emphasized in further research and development activities in the commercial waste management program. The action proposed in this EIS is to (1) adopt a national strategy to develop mined geologic repositories for disposal of commercially generated high-level and transuranic radioactive waste (while continuing to examine subseabed and very deep hole disposal as potential backup technologies) and (2) conduct a R and D program to develop such facilities and the necessary technology to ensure the safe long-term containment and isolation of these wastes. The Department has considered in this statement: development of conventionally mined deep geologic repositories for disposal of spent fuel from nuclear power reactors and/or radioactive fuel reprocessing wastes; balanced development of several alternative disposal methods; and no waste disposal action. This volume contains appendices of supplementary data on waste management systems, geologic disposal, radiological standards, radiation dose calculation models, related health effects, baseline ecology, socio-economic conditions, hazard indices, comparison of defense and commercial wastes, design considerations, and wastes from thorium-based fuel cycle alternatives

  13. Planning for a program design for energy environmental analysis. Final report, draft

    Energy Technology Data Exchange (ETDEWEB)

    Denton, J; Saaty, T; Blair, P; Ma, F; Buneman, P

    1976-04-01

    The objective of the work reported here is to assist BER/ERDA in program planning with respect to a regional assessment study program for energy environmental analysis. The focus of the work was to examine the use of operational gaming fof regional assessment studies. Specific concerns were gaming applications (1) in regional assessment or management and direction of regional assessments; (2) for achieving a higher level of public understanding of environmental, health, and safety problems of energy; (3) with respect to the supply of adequately trained manpower for energy; (4) with respect to computational requirements; and (5) with respect to current state-of-the-art in computer simulation. In order to investigate these concerns and examine the feasibility of using operational gaming in a regional assessment study program, a Regional Energy Environment Game (REEG) was designed and implemented on an IBM 370/168 digital computer employing APL (A Programming Language). The applicability of interactive operational gaming has been demonstrated by the REEG as applied to a region consisting of Delaware, Maryland, New Jersey, Pennsylvania, and the District of Columbia.

  14. Comparison of Generic-to-Brand Switchback Rates Between Generic and Authorized Generic Drugs.

    Science.gov (United States)

    Hansen, Richard A; Qian, Jingjing; Berg, Richard; Linneman, James; Seoane-Vazquez, Enrique; Dutcher, Sarah K; Raofi, Saeid; Page, C David; Peissig, Peggy

    2017-04-01

    Generic drugs contain identical active ingredients as their corresponding brand drugs and are pharmaceutically equivalent and bioequivalent, whereas authorized generic drugs (AGs) contain both identical active and inactive ingredients as their corresponding brand drugs but are marketed as generics. This study compares generic-to-brand switchback rates between generic and AGs. Retrospective cohort study. Claims and electronic health record data from a regional U.S. health care system. The full cohort consisted of 5542 unique patients who received select branded drugs during the 6 months prior to their generic drug market availability (between 1999 and 2014) and then were switched to an AG or generic drug within 30 months of generic drug entry. For these patients, 5929 unique patient-drug combinations (867 with AGs and 5062 with generic drugs) were evaluated. Ten drugs with AGs and generics marketed between 1999 and 2014 were evaluated. The date of the first generic prescription was considered the index date for each drug, and it marked the beginning of follow-up to evaluate the occurrence of generic-to-brand switchback patterns over the subsequent 30 months. Switchback rates were compared between patients receiving AGs versus those receiving generics using multivariable Cox proportional hazards models, controlling for individual drug effects, age, sex, Charlson Comorbidity Score, pre-index drug use characteristics, and pre-index health care utilization. Among the 5542 unique patients who switched from brand to generic or brand to AG, 264 (4.8%) switched back to the brand drug. Overall switchback rates were similar for AGs compared with generics (hazard ratio [HR] 0.86, 95% confidence interval [CI] 0.65-1.15). The likelihood of switchback was higher for alendronate (HR 1.64, 95% CI 1.20-2.23) and simvastatin (HR 1.81, 95% CI 1.30-2.54) and lower for amlodipine (HR 0.27, 95% CI 0.17-0.42) compared with the other drugs evaluated. Overall switchback rates were similar

  15. Final Environmental Impact Statement for the Treatment and Management of Sodium-Bonded Spent Nuclear Fuel

    International Nuclear Information System (INIS)

    2000-01-01

    DOE is responsible for the safe and efficient management of its sodium-bonded spent nuclear fuel. This fuel contains metallic sodium, a highly reactive material; metallic uranium, which is also reactive; and in some cases, highly enriched uranium. The presence of reactive materials could complicate the process of qualifying and licensing DOE's sodium-bonded spent nuclear fuel inventory for disposal in a geologic repository. Currently, more than 98 percent of this inventory is located at the Idaho National Engineering and Environmental Laboratory (INEEL), near Idaho Falls, Idaho. In addition, in a 1995 agreement with the State of Idaho, DOE committed to remove all spent nuclear fuel from Idaho by 2035. This EIS evaluates the potential environmental impacts associated with the treatment and management of sodium-bonded spent nuclear fuel in one or more facilities located at Argonne National Laboratory-West (ANL-W) at INEEL and either the F-Canyon or Building 105-L at the Savannah River Site (SRS) near Aiken, South Carolina. DOE has identified and assessed six proposed action alternatives in this EIS. These are: (1) electrometallurgical treatment of all fuel at ANL-W, (2) direct disposal of blanket fuel in high-integrity cans with the sodium removed at ANL-W, (3) plutonium-uranium extraction (PUREX) processing of blanket fuel at SRS, (4) melt and dilute processing of blanket fuel at ANL-W, (5) melt and dilute processing of blanket fuel at SRS, and (6) melt and dilute processing of all fuel at ANL-W. In addition, Alternatives 2 through 5 include the electrometallurgical treatment of driver fuel at ANL-W. Under the No Action Alternative, the EIS evaluates both the continued storage of sodium-bonded spent nuclear fuel until the development of a new treatment technology or direct disposal without treatment. Under all of the alternatives, the affected environment is primarily within 80 kilometers (50 miles) of spent nuclear fuel treatment facilities. Analyses indicate

  16. Final environmental assessment for vegetation control at VHF stations, microwave stations, electrical substations, and pole yards

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-13

    Southwestern Power Adm. operates very high frequency (VHF) and microwave radio stations, electrical substations, and pole yards for electric power transmission throughout AR, MO, and OK. Vegetation growth at the stations must be suppressed for safety of operation and personnel. Southwestern has been using a combination of mechanical/manual and herbicide control for this purpose; Federally- mandated reductions in staff and budgetary resources require Southwestern to evaluate all potentially efficient methods for vegetation control. Three alternatives were examined: no action, mechanical/manual control, and (proposed) a combination of mechanical/manual and herbicide control. Environmental impacts on air and water quality, wetlands, wildlife, endangered species, archaeological and other resources, farmland, human health, transportation, etc. were evaluated.

  17. Validity and design of environmental surveillance systems for operating nuclear power plants. Final report

    International Nuclear Information System (INIS)

    Eichholz, G.G.

    1977-12-01

    The composition and procedures of environmental surveillance programs at completed and operating nuclear power plants have been examined with respect to their validity, continuing significance and cost. It was found that many programs contain components that are mainly an extension of preoperational baseline measurements that need not be continued indefinitely and that others lack the statistical validity to make their continued application meaningful. To identify the practical limits imposed by counting statistics and realistic equipment capacity measurements were done on iodine-131 and cesium-137 containing samples to establish detectability limits and proportionate costs for sample preparation and counting. It was found that under commercial conditions effective detectability limits and expected confidence limits were substantially higher than those mentioned in NRC Regulatory Guides. This imposes a need for either selecting fewer samples and counting them for longer times or accepting a lesser accuracy on more samples, within the bounds of reasonable cost per sample

  18. Columbia River System Operation Review final environmental impact statement. Appendix E: Flood control

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The Corps of Engineers, Bonneville Power Administration, and Bureau of Reclamation conducted a scoping process consisting of a series of regionwide public meetings and solicitation of written comments in the summer of 1990. Comments on flood control issues were received from all parts of the Columbia river basin. This appendix includes issues raised in the public scoping process, as well as those brought for consideration by members of the Flood Control Work Group

  19. Columbia River System Operation Review final environmental impact statement. Appendix M: Water quality

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. Analysis of water quality begins with an account of the planning and evaluation process, and continues with a description of existing water quality conditions in the Columbia River Basin. This is followed by an explanation how the analysis was conducted. The analysis concludes with an assessment of the effects of SOR alternatives on water quality and a comparison of alternatives

  20. Sequoyah Uranium Hexafluoride Plant (Docket No. 40-8027): Final environmental statement

    International Nuclear Information System (INIS)

    1975-02-01

    The proposed action is the continuation of Source Material License SUB-1010 issued to Kerr-McGee Nuclear Corporation authorizing the operation of a uranium hexafluoride manufacturing facility located in Sequoyah County, Oklahoma, close to the confluence of the Illinois and Arkansas Rivers. The plant produces high purity uranium hexafluoride using uranium concentrates (yellowcake) as the starting material. It is currently designed to produce 5000 tons of uranium per year as uranium hexafluoride and has been in operation since February 1970 without significant environmental incident or discernible offsite effect. The manufacturing process being used includes wet chemical purification to convert yellowcake to pure uranium trioxide followed by dry chemical reduction, hydrofluorination, and fluorination technique to produce uranium hexafluoride. 8 figs, 12 tabs

  1. Columbia River System Operation Review final environmental impact statement. Appendix L: Soils, geology and groundwater

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. This appendix addresses the study of geology, soils, and groundwater concerns relative to the System Operation Review (SOR). Chapter 1 provides an overview of the study, scope, and process for this resource area. In order, the respective sections of this chapter discuss the relevant issues for the study, and the means by which the SOR team carried out the study

  2. Safety research experiment facilities, Idaho National Engineering Laboratory, Idaho. Final environmental impact statement

    International Nuclear Information System (INIS)

    Liverman, J.L.

    1977-09-01

    This environmental statement was prepared for the Safety Research Experiment Facilities (SAREF) Project. The purpose of the proposed project is to modify some existing facilities and provide a new test facility at the Idaho National Engineering Laboratory (INEL) for conducting fast breeder reactor (FBR) safety experiments. The SAREF Project proposal has been developed after an extensive study which identified the FBR safety research needs requiring in-reactor experiments and which evaluated the capability of various existing and new facilities to meet these needs. The proposed facilities provide for the in-reactor testing of large bundles of prototypical FBR fuel elements under a wide variety of conditions, ranging from those abnormal operating conditions which might be expected to occur during the life of an FBR power plant to the extremely low probability, hypothetical accidents used in the evaluation of some design options and in the assessment of the long-term potential risk associated with wide-acale deployment of the FBR

  3. Superconducting Super Collider: Final environmental impact statement: Volume 2, Comment/response document: Summary and index

    International Nuclear Information System (INIS)

    1988-12-01

    This volume is divided into five parts as follows: Summary and Index; Letters submitted by commenters in response to the Draft Environmental Impact Statement (DEIS) from date of issue through October 17, 1988; Transcripts of testimony at the public hearings conducted by the DOE in the vicinity of each site alternative; Letters postmarked after October 17, 1988; and Comment responses to both the letters and the testimony. This summary and index is published as a guide to the reader in reviewing this document. The summary is of the approximately 7000 comments received by the DOE from a total of about 5700 commenters. It was prepared as a general reference and guide to the readers of this volume. The Index follows the summary. The first index is an alphabetical listing of commenters (of both letters and transcripts) and indicates the number each commenter was assigned. The commenter numbers guide the reader to DOE comment responses in Volume 2B which are in numerical order

  4. Tenth international symposium on environmental biogeochemistry. Final technical report, December 15, 1990--December 14, 1991

    Energy Technology Data Exchange (ETDEWEB)

    Ehrlich, H.L.

    1992-01-01

    The primary task of this Symposium on Environmental Biogeochemistry was to examine our current understanding of GLOBAL CHANGE AND THE BIOGEOCHEMISTRY OF RADIATIVE TRACE GASES. The symposium was divided into 12 non-overlapping sessions: Paleoatmospheres and paleoclimates; Global distributions and atmospheric reactions; Poster presentations on the topics of sessions 1, 2, 4, 5, and 7; Terrestrial systems and land use change - 1; Terrestrial and land use change - 11; Fluxes and cycling in aquatic systems; Metals, organics, and depositional environments; Poster presentations on the topics of sessions 6, 9, 10 and 12; Biological Mechanisms of formation and destruction - 1; Biological mechanisms of formation and destruction - 11; High latitude systems; and Global sources, sinks, and feedbacks.

  5. Achieving the Security, Environmental, and Economic Potential of Bioenergy. Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Riggs, John A

    2006-06-07

    A group of business, government, environmental and academic leaders convened in a dialogue by the Aspen Institute proposed a series of actions to promote the widespread commercialization of both corn and cellulosic ethanol to improve energy security, the environment, and the economy. Co-chaired by Booz Allen Hamilton Vice President and former CIA Director R. James Woolsey and former Congressman Tom Ewing (R. IL), they developed a series of recommendations involving improved crop yields, processing of biomass into ethanol, manufacture of more cars that can burn either ethanol or gasoline, and the provision of ethanol pumps at more filling stations. Their report, "A High Growth Strategy for Ethanol, includes a discussion of the potential of ethanol, the group's recommendations, and a series of discussion papers commissioned for the dialogue.

  6. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix N: Wildlife.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1995-11-01

    The Columbia River System is a vast and complex combination of Federal and non-Federal facilities used for many purposes including power production, irrigation, navigation, flood control, recreation, fish and wildlife habitat and municipal and industrial water supply. Each river use competes for the limited water resources in the Columbia River Basin. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The environmental impact statement (EIS) itself and some of the other appendices present analyses of the alternative approaches to the other three decisions considered as part of the SOR. This document is the product of the Wildlife Work Group, focusing on wildlife impacts but not including fishes. Topics covered include the following: scope and process; existing and affected environment, including specific discussion of 18 projects in the Columbia river basin. Analysis, evaluation, and alternatives are presented for all projects. System wide impacts to wildlife are also included.

  7. Environmental and economic effects of subsidence: Category 4, Project 1. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Viets, V.F.; Vaughan, C.K.; Harding, R.C.

    1979-05-01

    A list of more than 70 subsidence areas was screened to select those areas which seemed to have the best potential for providing reliable data. The screening process is described in an appendix. Nine areas were selected for detailed case studies to collect all available data on the environmental and economic effects of the subsidence. Available information from the subsidence areas not selected as case studies was tabulated for each area and is included in an appendix. The nine case study areas are: Arizona; San Joaquin Valley, California; Baldwin Hills, California; Santa Clara Valley, California; Wilmington, California; Las Vegas Valley, Nevada; Houston-Galveston area, Texas; Mexico City, Mexico; and Wairakei, New Zealand. (MHR)

  8. Environmental Remediation Science at Beamline X26A at the National Synchrotron Light Source- Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Bertsch, Paul [Univ. of Kentucky, Lexington, KY (United States)

    2013-11-07

    The goal of this project was to provide support for an advanced X-ray microspectroscopy facility at the National Synchrotron Light Source, Brookhaven National Laboratory. This facility is operated by the University of Chicago and the University of Kentucky. The facility is available to researchers at both institutions as well as researchers around the globe through the general user program. This facility was successfully supported during the project period. It provided access to advanced X-ray microanalysis techniques which lead to fundamental advances in understanding the behavior of contaminants and geochemistry that is applicable to environmental remediation of DOE legacy sites as well as contaminated sites around the United States and beyond.

  9. Columbia River system operation review: Final environmental impact statement. Appendix N, wildlife

    International Nuclear Information System (INIS)

    1995-11-01

    The Columbia River System is a vast and complex combination of Federal and non-Federal facilities used for many purposes including power production, irrigation, navigation, flood control, recreation, fish and wildlife habitat and municipal and industrial water supply. Each river use competes for the limited water resources in the Columbia River Basin. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The environmental impact statement (EIS) itself and some of the other appendices present analyses of the alternative approaches to the other three decisions considered as part of the SOR. This document is the product of the Wildlife Work Group, focusing on wildlife impacts but not including fishes. Topics covered include the following: scope and process; existing and affected environment, including specific discussion of 18 projects in the Columbia river basin. Analysis, evaluation, and alternatives are presented for all projects. System wide impacts to wildlife are also included

  10. Final environmental statement: US Spent Fuel Policy. Storage of foreign spent power reactor fuel

    International Nuclear Information System (INIS)

    1980-05-01

    In October 1977, the Department of Energy (DOE) announced a Spent Fuel Storage Policy for nuclear power reactors. Under this policy, as approved by the President, US utilities will be given the opportunity to deliver spent fuel to US Government custody in exchange for payment of a fee. The US Government will also be prepared to accept a limited amount of spent fuel from foreign sources when such action would contribute to meeting nonproliferation goals. Under the new policy, spent fuel transferred to the US Government will be delivered - at user expense - to a US Government-approved site. Foreign spent fuel would be stored in Interim Spent Fuel Storage (ISFS) facilities with domestic fuel. This volume of the environmental impact statement includes effects associated with implementing or not implementing the Spent Fuel Storage Policy for the foreign fuels. The analyses show that there are no substantial radiological health impacts whether the policy is implemented or not. In no case considered does the population dose commitment exceed 0.000006% of the world population dose commitment from natural radiation sources over the period analyzed. Full implementation of the US offer to accept a limited amount of foreign spent fuel for storage provides the greatest benefits for US nonproliferation policy. Acceptance of lesser quantities of foreign spent fuel in the US or less US support of foreign spent fuel storage abroad provides some nonproliferation benefits, but at a significantly lower level than full implementation of the offer. Not implementing the policy in regard to foreign spent fuel will be least productive in the context of US nonproliferation objectives. The remainder of the summary provides a brief description of the options that are evaluated, the facilities involved in these options, and the environmental impacts, including nonproliferation considerations, associated with each option

  11. Selenium transformation in coal mine spoils: Its environmental impact assessment. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Harness, J.; Atalay, A.; Koll, K.J.; Zhang, H.; Maggon, D.

    1991-12-31

    The objective of this program was to conduct an environmental impact assessment study for selenium from coal mine spoils. The use of in-situ lysimetry to predict selenium speciation, transformation, and mobility under natural conditions was evaluated. The scope of the study was to construct and test field-scale lysimeter and laboratory mini-column to assess mobility and speciation of selenium in coal mine overburden and soil systems; to conduct soil and groundwater sampling throughout the state of Oklahoma for an overall environmental impact assessment of selenium; and to conduct an in-depth literature review on the solubility, speciation, mobility, and toxicity of selenium from various sources. Groundwater and surface soil samples were also collected from each county in Oklahoma. Data collected from the lysimeter study indicated that selenium in the overburden of the abandoned mine site was mainly found in the selenite form. The amount of selenite found was too low and immobile to be of concern to the environment. The spoil had equilibrated long enough (over 50 years) that most of the soluble forms of selenium have already been lost. Examination of the overburden indicated the presence of pyrite crystals that precipitated over time. The laboratory mini-column study indicated that selenite is quite immobile and remained on the overburden material even after leaching with dilute acid. Data from groundwater samples indicated that based on the current permissible level for selenium in groundwater (0.01 mg Se/L), Oklahoma groundwater is widely contaminated with the element. However, according to the new regulation (0.05 mg Se/L), which is to be promulgated in 1992, only 9 of the 77 counties in the state exceed the limit.

  12. National Institute for Global Environmental Change. Final Technical Report 1990-2007

    Energy Technology Data Exchange (ETDEWEB)

    Athanasios Toulopoulos

    2007-11-01

    Research conducted by the six NIGEC Regional Centers during recent years is reported. An overview of the NIGEC program from its beginnings provides a description and evaluation of the program's vision, strategy and major accomplishments. The program's purpose was to support academic research on environmental change in regions of the country that had historically received relatively little federal funding. The overall vision of NIGEC may be stated as the performance of academic research on the regional interactions between ecosystems and climate. NIGEC's research presents important evidence on the impacts of climate variability and change, and in some cases adaptability, for a broad range of both managed and unmanaged ecosystems, and has thereby documented significant regional issues on the environmental responses to climate change. NIGEC's research has demonstrated large regional differences in the atmospheric carbon exchange budgets of croplands and forests, that there are significant variations of this exchange on diurnal, synoptic, seasonal and interannual time scales due to atmospheric variability (including temperature, precipitation and cloudiness), and that management practices and past history have predominant effects in grasslands and croplands. It is the mid-latitude forests, however, that have received more attention in NIGEC than any other specific ecosystem, and NIGEC's initiation of and participation in the AmeriFlux program, network of carbon flux measurement sites in North American old-growth forests, is generally considered to be its most significant single accomplishment. By including appendices with complete listings of NIGEC publications, principal investigators and participating institutions, this report may also serve as a useful comprehensive documentation of NIGEC.

  13. Final Report: Results of Environmental Site Investigation at Sylvan Grove, Kansas

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, Lorraine M [Argonne National Lab. (ANL), Argonne, IL (United States)

    2014-09-01

    Sylvan Grove is located in western Lincoln County, approximately 60 mi west of Salina, Kansas (Figure 1.1). From 1954 to 1966, the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), operated a grain storage facility at the northeastern edge of Sylvan Grove. During this time, commercial grain fumigants containing carbon tetrachloride were in common use to preserve grain in storage. In 1998, the Kansas Department of Health and Environment (KDHE) found carbon tetrachloride above the maximum contaminant level (MCL) of 5 μg/L in groundwater from one private well used for livestock and lawn and garden watering. The 1998 KDHE sampling at Sylvan Grove was conducted under the USDA private well sampling program. To determine whether the former CCC/USDA facility at Sylvan Grove is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA proposed to conduct an environmental site investigation, in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency (FSA) of the USDA. Argonne National Laboratory, on behalf of the CCC/USDA, developed a work plan (Argonne 2012) for the site investigation and a supplemental work plan for indoor and ambient air sampling (Appendix A). The proposed work was approved by the KDHE (2012a, 2013). The investigations were performed by the Environmental Science Division of Argonne National Laboratory, on behalf of the CCC/USDA. The main activities for the site investigation were conducted in June 2012, and indoor and ambient air sampling was performed in February 2013. This report presents the findings of the investigations at Sylvan Grove.

  14. Salt Lake City Area Integrated Projects electric power marketing -- Final environmental impact statement. Volume 1: Summary

    International Nuclear Information System (INIS)

    1996-01-01

    The Colorado River Storage Project Customer Service Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande rivers and on Plateau Creek in Arizona, Colorado, Utah, Wyoming, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams) are influenced by Western power scheduling and transmission decisions. The environmental impact statement (EIS) alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Western's firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this EIS include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources. Western has identified commitment-level alternative 1, the Post-1989 commitment level, as its preferred alternative. The impact evaluations indicate that this commitment level is also the environmentally preferred alternative

  15. Preservation of martian organic and environmental records: final report of the Mars biosignature working group.

    Science.gov (United States)

    Summons, Roger E; Amend, Jan P; Bish, David; Buick, Roger; Cody, George D; Des Marais, David J; Dromart, Gilles; Eigenbrode, Jennifer L; Knoll, Andrew H; Sumner, Dawn Y

    2011-03-01

    The Mars Science Laboratory (MSL) has an instrument package capable of making measurements of past and present environmental conditions. The data generated may tell us if Mars is, or ever was, able to support life. However, the knowledge of Mars' past history and the geological processes most likely to preserve a record of that history remain sparse and, in some instances, ambiguous. Physical, chemical, and geological processes relevant to biosignature preservation on Earth, especially under conditions early in its history when microbial life predominated, are also imperfectly known. Here, we present the report of a working group chartered by the Co-Chairs of NASA's MSL Project Science Group, John P. Grotzinger and Michael A. Meyer, to review and evaluate potential for biosignature formation and preservation on Mars. Orbital images confirm that layered rocks achieved kilometer-scale thicknesses in some regions of ancient Mars. Clearly, interplays of sedimentation and erosional processes govern present-day exposures, and our understanding of these processes is incomplete. MSL can document and evaluate patterns of stratigraphic development as well as the sources of layered materials and their subsequent diagenesis. It can also document other potential biosignature repositories such as hydrothermal environments. These capabilities offer an unprecedented opportunity to decipher key aspects of the environmental evolution of Mars' early surface and aspects of the diagenetic processes that have operated since that time. Considering the MSL instrument payload package, we identified the following classes of biosignatures as within the MSL detection window: organism morphologies (cells, body fossils, casts), biofabrics (including microbial mats), diagnostic organic molecules, isotopic signatures, evidence of biomineralization and bioalteration, spatial patterns in chemistry, and biogenic gases. Of these, biogenic organic molecules and biogenic atmospheric gases are

  16. Final Environmental Impact Statement to construct and operate the Crownpoint Uranium Solution Mining Project, Crownpoint, New Mexico

    International Nuclear Information System (INIS)

    1997-02-01

    This Final Environmental Impact Statement (FEIS) addresses the proposed action of issuing a combined source and 11e(2) byproduct material license and minerals operating leases for Federal and Indian lands to Hydro Resources, Inc. (HRI). This action would authorize HRI to conduct in-situ leach uranium mining in McKinley County, New Mexico. Such mining would involve drilling wells to access the ore bodies, then recirculating groundwater with added oxygen to mobilize uranium found in the ore. Uranium would then be removed from the solution using ion exchange technology in processing plants located at three separate sites. As proposed by HRI, a central plant would provide drying and packaging equipment for the entire project. The Draft Environmental Impact Statement (DEIS) for the proposed action was prepared by an interagency review group comprising staff from the Nuclear Regulatory Commission, the Bureau of Indian Affairs, and the Bureau of Land Management, and published in October 1994. After evaluating the environmental impacts of the proposed action in the DEIS, the reviewing agencies concluded that the appropriate action was to issue the requested license and proposed leases authorizing HRI to proceed with the project. This FEIS reevaluates the proposed licensing action on the basis of written and oral comments received on the DEIS and on additional information obtained in 1995 and 1996. The FEIS describes and evaluates (1) the purpose of and need for the proposed action, (2) alternatives to the proposed action, (3) the environmental resources that could be affected by the proposed action and alternatives, (4) the potential environmental consequences of the proposed action and alternatives, and (5) the economic costs and benefits associated with the proposed action. Based on this assessment, the FEIS makes recommendations concerning the requested license and proposed leases

  17. DOE Chair of Excellence in Environmental Disciplines-Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Kurunganty, Sastry; Loran, Roberto; Roque-Malherbe, Rolando; Hijazi, Yazan; Nieto, Santander; Gomez, Will A.; Duconge, Jose; Cotto, María del C.; Muniz, Carlos; Diaz, Francisco J.; Neira, Carlos F.; Marquez, Francisco; Del Valle, W.; Thommes, M.

    2014-02-19

    The report Massie Chair of Excellence Program at Universidad del Turabo, contract DE-FG02-95EW12610, during the period of 9/29/1995 to 9/29/2011. The initial program aims included development of academic programs in the Environmental Sciences and Engineering, and Research and Development focused initially on environmentally friendly processes and later revised also include: renewable energy and international cooperation. From 1995 -2005, the Program at UT lead the establishment of the new undergraduate program in electrical engineering at the School of Engineering (SoE), worked on requirements to achieve ABET accreditation of the SoE B.S. Mechanical Engineering and B.S. Electrical Engineering programs, mentored junior faculty, taught undergraduate courses in electrical engineering, and revised the electrical engineering curriculum. Engineering undergraduate laboratories were designed and developed. The following research sub-project was developed: Research and development of new perovskite-alumina hydrogen permeable asymmetrical nanostructured membranes for hydrogen purification, and extremely high specific surface area silica materials for hydrogen storage in the form of ammonia, Dr. Rolando Roque-Malherbe Subproject PI, Dr. Santander Nieto and Mr. Will Gómez Research Assistants. In 2006, the Massie Chair of Excellence Program was transferred to the National Nuclear Security Agency, NNSA and DNN. DoE required a revised proposal aligned with the priorities of the Administration. The revised approved program aims included: (1) Research (2) Student Development: promote the development of minority undergraduate and graduate students through research teams, internships, conferences, new courses; and, (3) Support: (a) Research administration and (b) Dissemination through international conferences, the UT Distinguished Lecturer Series in STEM fields and at the annual Universidad del Turabo (UT) Researchers Conference. Research included: Sub-Project 1: Synthesis and

  18. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume I

    Energy Technology Data Exchange (ETDEWEB)

    None

    1996-10-01

    This programmatic environmental impact statement (PElS) was prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project to comply with the National Environmental Policy Act (NEPA). This PElS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. On November 8, 1978, Congress enacted the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law, codified at 42 USC §7901 et seq. Congress found that uranium mill tailings " ... may pose a potential and significant radiation health hazard to the public, and that every reasonable effort should be made to provide for stabilization, disposal, and control in a safe, and environmentally sound manner of such tailings in order to prevent or minimize other environmental hazards from such tailings." Congress authorized the Secretary of Energy to designate inactive uranium processing sites for remedial action by the U.S. Department of Energy (DOE). Congress also directed the U.S. Environmental Protection Agency (EPA) to set the standards to be followed by the DOE for this process of stabilization, disposal, and control. On January 5, 1983, EPA published standards (40 CFR Part 192) for the disposal and cleanup of residual radioactive materials. On September 3, 1985, the U.S. Court of Appeals for the Tenth Circuit set aside and remanded to EPA the ground water provisions of the standards. The EPA proposed new standards to replace remanded sections and changed other sections of 40 CFR Part 192. These proposed standards were published in the Federal Register on September 24, 1987 (52 FR 36000). Section 108 of the UMTRCA requires that DOE comply with EPA's proposed standards in the absence of final standards. The Ground Water Project was planned under the proposed standards. On January 11, 1995, EPA published the final rule, with which the DOE must now comply. The PElS and the Ground Water Project are

  19. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume I

    International Nuclear Information System (INIS)

    1996-01-01

    This programmatic environmental impact statement (PElS) was prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project to comply with the National Environmental Policy Act (NEPA). This PElS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. On November 8, 1978, Congress enacted the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law, codified at 42 USC §7901 et seq. Congress found that uranium mill tailings ' ... may pose a potential and significant radiation health hazard to the public, and that every reasonable effort should be made to provide for stabilization, disposal, and control in a safe, and environmentally sound manner of such tailings in order to prevent or minimize other environmental hazards from such tailings.' Congress authorized the Secretary of Energy to designate inactive uranium processing sites for remedial action by the U.S. Department of Energy (DOE). Congress also directed the U.S. Environmental Protection Agency (EPA) to set the standards to be followed by the DOE for this process of stabilization, disposal, and control. On January 5, 1983, EPA published standards (40 CFR Part 192) for the disposal and cleanup of residual radioactive materials. On September 3, 1985, the U.S. Court of Appeals for the Tenth Circuit set aside and remanded to EPA the ground water provisions of the standards. The EPA proposed new standards to replace remanded sections and changed other sections of 40 CFR Part 192. These proposed standards were published in the Federal Register on September 24, 1987 (52 FR 36000). Section 108 of the UMTRCA requires that DOE comply with EPA's proposed standards in the absence of final standards. The Ground Water Project was planned under the proposed standards. On January 11, 1995, EPA published the final rule, with which the DOE must now comply. The PElS and the Ground Water Project are in

  20. Comprehensive Environmental Assessment Applied to Multiwalled Carbon Nanotube Flame-Retardant Coatings in Upholstery Textiles: A Case Study Presenting Priority Research Gaps for Future Risk Assessments (Final Report)

    Science.gov (United States)

    In September 2013, EPA announced the availability of the final report, Comprehensive Environmental Assessment Applied to Multiwalled Carbon Nanotube Flame-Retardant Coatings in Upholstery Textiles: A Case Study Presenting Priority Research Gaps for Future Risk Assessments...

  1. European coordination of environmental airborne gamma ray spectrometry. Final report 1999

    International Nuclear Information System (INIS)

    Sanderson, D.C.; McLeod, J.J.

    1999-04-01

    This Concerted Action was funded under the EURATOM Nuclear Fission Safety Programme of the Fourth Framework Programme, and was initiated to address transnational issues relating to environmental airborne gamma ray spectrometry (AGS). Significant development of AGS systems and teams has taken place within Europe during the period following the Chernobyl accident. The technique is increasingly recognised as particularly relevant to emergency response. It is also uniquely capable of acquiring data on anthropogenic and natural radionuclides on regional, national and international scales, for reference purposes, ecological studies and epidemiological research. Prior to this EU programme the methodologies and systems used by European AGS teams had undergone rapid and largely uncoordinated development. This raised questions about comparability of systems, applications, and data between teams, duplication of research, the scope for transnational cooperation and standardisation, and future research and development needs in the field. This project, which brought together ten AGS teams from across Europe, was formed to address these issues. The work was conducted in three stages and has largely succeeded in its objectives. An active communication network was developed for collaboration and exchange of information, and to start the process of harmonisation of the different methodologies used by individual AGS teams. Two formal partners' meetings were organised, the first aimed at defining the EU capability in AGS, the second, in the form of an international symposium (RADMAGS), was aimed at reviewing developments on future research needs and the scope for standardisation. This report gives full details of the project and its deliverables together with discussion of the further needs in support of transnational harmonisation of this topic. The European Capability for AGS was defined at an early stage of the project, and monitored throughout. An EU Bibliography on AGS

  2. Final Site-Wide Environmental Impact Statement for the Y-12 National Security Complex

    International Nuclear Information System (INIS)

    2001-01-01

    The National Nuclear Security Administration (NNSA) a separately organized agency within the U.S. Department of Energy (DOE) is responsible for providing the Nation with nuclear weapons and ensuring that those nuclear weapons remain safe, secure, and reliable. As one of the DOE major production facilities, the Y-12 National Security Complex has been DOE's primary site for enriched uranium processing and storage, and one of the manufacturing facilities for maintaining the U.S. nuclear weapons stockpile. In response to the end of the Cold War and changes in the world's political regimes, the emphasis of the U.S. weapons program has shifted dramatically over the past few years from developing and producing new weapons to dismantlement and maintenance of a smaller, enduring stockpile. The ''Stockpile Stewardship and Management Programmatic Environmental Impact Statement'' [SSM PEIS], DOE/EIS-0236, issued in September 1996, evaluated alternatives for maintaining the safety and reliability of the nuclear weapons stockpile without underground nuclear testing or production of new-design weapons. In the SSM PEIS Record of Decision (ROD), DOE decided to maintain the national security missions at the Y-12 National Security Complex, but to downsize Y-12 consistent with reduced requirements. These national security missions include (1) maintaining the capability and capacity to fabricate secondaries, limited life components, and case parts for nuclear response; (2) evaluating components and subsystems returned from the stockpile; (3) storing enriched uranium that is designated for national security purposes; (4) storing depleted uranium and lithium parts; (5) dismantling nuclear weapons secondaries returned from the stockpile; (6) processing uranium and lithium (which includes chemical recovery, purification, and conversion of enriched uranium and lithium to a form suitable for long-term storage and/or further use); and (7) providing support to weapons laboratories. During the

  3. Growth in Biofuels Markets: Long Term Environmental and Socioeconomic Impacts (Final Report)

    Energy Technology Data Exchange (ETDEWEB)

    Seth D. Meyer; Nicholas Kalaitzandonakes

    2010-12-02

    Over the last several years increasing energy and petroleum prices have propelled biofuels and the feedstocks used to produce them, to the forefront of alternative energy production. This growth has increased the linkages between energy and agricultural markets and these changes around the world are having a significant effect on agricultural markets as biofuels begin to play a more substantial role in meeting the world's energy needs. Biofuels are alternatively seen as a means to reduce carbon emissions, increase energy independence, support rural development and to raise farm income. However, concern has arisen that the new demand for traditional commodities or alternative commodities which compete for land can lead to higher food prices and the environmental effects from expanding crop acreage may result in uncertain changes in carbon emissions as land is converted both in the US and abroad. While a number of studies examine changes in land use and consumption from changes in biofuels policies many lack effective policy representation or complete coverage of land types which may be diverted in to energy feedstock production. Many of these biofuels and renewable energy induced land use changes are likely to occur in developing countries with at-risk consumers and on environmentally sensitive lands. Our research has improved the well known FAPRI-MU modeling system which represents US agricultural markets and policies in great detail and added a new model of land use and commodity markets for major commodity producers, consumers and trade dependent and food insecure countries as well as a rest of the world aggregate. The international modules include traditional annual crop lands and include perennial crop land, pasture land, forest land and other land uses from which land may be drawn in to biofuels or renewable energy feedstock production. Changes in calorie consumption in food insecure countries from changes in renewable energy policy can also be examined

  4. Final Long-Term Management and Storage of Elemental Mercury Environmental Impact Statement Summary and Guide for Stakeholders

    Energy Technology Data Exchange (ETDEWEB)

    2011-01-01

    Pursuant to the Mercury Export Ban Act of 2008 (P.L. 110-414), DOE was directed to designate a facility or facilities for the long-term management and storage of elemental mercury generated within the United States. Therefore, DOE has analyzed the storage of up to 10,000 metric tons (11,000 tons) of elemental mercury in a facility(ies) constructed and operated in accordance with the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (74 FR 31723). DOE prepared this Final Mercury Storage EIS in accordance with the National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 et seq.), the Council on Environmental Quality (CEQ) implementing regulations (40 CFR 1500–1508), and DOE’s NEPA implementing procedures (10 CFR 1021) to evaluate reasonable alternatives for a facility(ies) for the long-term management and storage of elemental mercury. This Final Mercury Storage EIS analyzes the potential environmental, human health, and socioeconomic impacts of elemental mercury storage at seven candidate locations: Grand Junction Disposal Site near Grand Junction, Colorado; Hanford Site near Richland, Washington; Hawthorne Army Depot near Hawthorne, Nevada; Idaho National Laboratory near Idaho Falls, Idaho; Kansas City Plant in Kansas City, Missouri; Savannah River Site near Aiken, South Carolina; and Waste Control Specialists, LLC, site near Andrews, Texas. As required by CEQ NEPA regulations, the No Action Alternative was also analyzed as a basis for comparison. DOE intends to decide (1) where to locate the elemental mercury storage facility(ies) and (2) whether to use existing buildings, new buildings, or a combination of existing and new buildings. DOE’s Preferred Alternative for the long-term management and storage of mercury is the Waste Control Specialists, LLC, site near Andrews, Texas.

  5. Projection of Environmental Pollutant Emissions From Different Final Waste Disposal Methods Based on Life Cycle Assessment Studies in Qazvin City

    Directory of Open Access Journals (Sweden)

    Javad Torkashvand

    2015-12-01

    Full Text Available In the current study, the life cycle assessment (LCA method was used to expect the emissions of different environmental pollutants through qualitative and quantitative analyses of solid wastes of Qazvin city in different final disposal methods. Therefore, four scenarios with the following properties considering physical analysis of Qazvin’s solid wastes, the current status of solid waste management in Iran, as well as the future of solid waste management of Qazvin were described. In order to detect the quantity of the solid wastes, the volume-weighted analysis was used and random sampling method was used for physical analysis. Of course, regarding the method of LCA, it contains all stages from solid wastes generation to its disposal. However, since the main aim of this study was final disposal stage, the emissions of pollutants of these stages were ignored. Next, considering the mixture of the solid waste, the amount of pollution stemming from each of final disposal methods from other cities having similar conditions was estimated. The findings of the study showed that weight combination of Qazvin solid wastes is entirely similar to that of other cities. Thus, the results of this study can be applied by decision makers around the country. In scenarios 1 and 2, emission of leachate containing high amounts of COD and BOD is high and also the highest content of nitrate, which can contaminate water and soil resulting in high costs for their management. In scenarios 3 and 4, the amounts of gaseous pollutants, particularly CO2, as well as nitrogen oxides are very high. In conclusion, the LCA methods can effectively contribute to the management of municipal solid wastes (MSW to control environmental pollutants with least expenses.

  6. Disposal of chemical agents and munitions stored at Pueblo Depot Activity, Colorado. Final, Phase 1: Environmental report

    Energy Technology Data Exchange (ETDEWEB)

    Terry, J.W.; Blasing, T.J.; Ensminger, J.T.; Johnson, R.O.; Schexnayder, S.M.; Shor, J.T.; Staub, W.P.; Tolbert, V.R.; Zimmerman, G.P.

    1995-04-01

    Under the Chemical Stockpile Disposal Program (CSDP), the US Army proposes to dispose of lethal chemical agents and munitions stored at eight existing Army installations in the continental United States. In 1988, the US Army issued the final programmatic environmental impact statement (FPEIS) for the CSDP. The FPEIS and the subsequent Record of Decision (ROD) identified an on-site disposal process as the preferred method for destruction of the stockpile. That is, the FPEIS determined the environmentally preferred alternative to be on-site disposal in high-temperature incinerators, while the ROD selected this alternative for implementation as the preferred method for destruction of the stockpile. In this Phase I report, the overall CSDP decision regarding disposal of the PUDA Stockpile is subjected to further analyses, and its validity at PUDA is reviewed with newer, more detailed data than those providing the basis for the conclusions in the FPEIS. The findings of this Phase I report will be factored into the scope of a site-specific environmental impact statement to be prepared for the destruction of the PUDA stockpile. The focus of this Phase I report is on those data identified as having the potential to alter the Army`s previous decision regarding disposal of the PUDA stockpile; however, several other factors beyond the scope of this Phase I report must also be acknowledged to have the potential to change or modify the Army`s decisions regarding PUDA.

  7. Article choice in plural generics

    NARCIS (Netherlands)

    Farkas, D.F.; Swart, Henriëtte de

    2007-01-01

    We discuss two groups of languages where article use contrasts in generic plural sentences but is otherwise essentially similar. The languages in the first group (English and Dutch) use bare plurals in the expression of kind reference (‘Dinosaurs are extinct’) and in generic

  8. Environmental impact of coal ash on tributary streams and nearshore water or Lake Erie. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Wood, K.G.

    1978-08-01

    The environmental impact of coal ash disposal at a landfill site in north-central Chautauqua County, New York was studied from June 1975 through July 1977. Water samples taken from wells, ponds, and streams at 67 sites were analyzed for specific conductance, pH, alkalinity, arsenic, calcium, cadmium, chloride, chromium, copper, iron, magnesium, manganese, potassium, selenium, sodium, sulfate and zinc. Evidence suggests that ponds at the landfill were high in Ca, Fe, Mg, Mn, and SO/sub 4/ compared to control pands. A stream adjacent to the site contained greater Mn (207 ug/1) and SO/sub 4/ (229 ppm) than control streams. Shallow alkaline test wells in the landfill had elevated As, Ca, and Se. Acid-neutral test wells had elevated As, Ca, Cr, Mg and Mn. Household wells in the vicinity of the landfill showed no evident contamination from the landfill. Average iron concentrations in the biota were tripled, and manganese concentrations doubled in biota affected by the coal ash dump. However, any effects of the disposal area on the distribution of the biota could not be separated from effects of varying environment factors such as water movements, substrate composition and food availability. No harmful effects could be demonstrated on the biota in the creek which flowed past the disposal area.

  9. Environmental studies related to the operation of wind energy conversion systems. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, S.E.; Cornaby, B.W.; Rodman, C.W.; Sticksel, P.R.; Tolle, D.A.

    1977-12-01

    This biophysical impact assessment explores the environmental consequences of the emerging wind energy conversion technology through field studies done at the DOE/NASA 100-kW Experimental Wind Turbine located at NASA Lewis Research Center's Plum Brook Station near Sandusky, Ohio. A micrometeorological field program monitored changes in the downwind wake of the wind turbine. Horizontal and/or vertical measurements of wind speed, temperature, carbon dioxide concentration, precipitation, and incident solar radiation showed measurable variation within the wake only for precipitation and wind speed. The changes were minor and not likely to result in any secondary effects to vegetation, including crops, because they are within the natural range of variability in the site environment. Effects are negligible beyond the physically altered area of the tower pad, access, and control structures. The wind turbine has not proved to be a high risk to airborne fauna, including the most vulnerable night-migrating songbirds. Behavioral studies indicate the birds will avoid the turbine if they can see it.

  10. Final environmental assessment for the Liquid Phase Methanol (LPMEOH trademark) Project

    International Nuclear Information System (INIS)

    1995-06-01

    The proposed project is to demonstrate on a commercial scale the production of methanol from coal-derived synthesis gas using the LPMEOH trademark process. The methanol produced during this demonstration will be used as a chemical feedstock (on-site) and/or as an alternative fuel in stationary and transportation applications (off-site). In addition, the production of dimethyl ether (DME) as a mixed co-product with methanol may be demonstrated for a six month period under the proposed project pending the results of laboratory/pilot-scale research on scale-up. The DME would be used as fuel in on-site boilers. The proposed LPMEOH facility would occupy approximately 0.6 acres of the 3,890-acre Eastman Chemical facility in Kingsport, TN. The effects of the proposed project include changes in air emissions, wastewater discharge, cooling water discharge, liquid waste quantities, transportation activities, socioeconomic effects, and quantity of solids for disposal. No substantive negative impacts or environmental concerns were identified

  11. Potential health and environmental impacts attributable to the nuclear and coal fuel cycles: Final report

    International Nuclear Information System (INIS)

    Gotchy, R.L.

    1987-06-01

    Estimates of mortality and morbidity are presented based on present-day knowledge of health effects resulting from current component designs and operations of the nuclear and coal fuel cycles, and anticipated emission rates and occupational exposure for the various fuel cycle facilities expected to go into operation during the next decade. The author concluded that, although there are large uncertainties in the estimates of potential health effects, the coal fuel cycle alternative has a greater health impact on man than the uranium fuel fycle. However, the increased risk of health effects for either fuel cycle represents a very small incremental risk to the average individual in the public for the balance of this century. The potential for large impacts exists in both fuel cycles, but the potential impacts associated with a runaway Greenhouse Effect from combustion of fossil fuels, such as coal, cannot yet be reasonably quantified. Some of the potential environmental impacts of the coal fuel cycle cannot currently be realistically estimated, but those that can appear greater than those from the nuclear fuel cycle. 103 refs., 1 fig., 18 tabs

  12. Electric Power Research Institute, Environmental Control Technology Center report to the steering committee. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    Operations and maintenance continued this month at the Electric Power Research Institute`s Environmental Control Technology Center. Testing on the 4.0 MW Pilot Wet FGD unit continued with the Pilot High Velocity FGD (PHV) and the Trace Element Removal (TER) test blocks. In the High Velocity test block, SO{sub 2} removal and mist eliminator carryover rates were investigated while operating the absorber unit with various spray nozzle types and vertical mist eliminator sections. During the Trace Element Removal test block, the mercury measurements and control studies involving the EPA Method 29 continued with testing of several impinger capture solutions, and the use of activated carbon injection across the Pulse-Jet Fabric Filter (PJFF) unit. The 4.0 MW Spray Dryer Absorber System was utilized this month in the TER test configuration to inject and transfer activated carbon to the PJFF bags for downstream mercury capture. Work also began in December to prepare the 0.4 MW Mini-Pilot Absorber system for receipt of the B and W Condensing Heat Exchanger (CHX) unit to be used in the 1996 DOE/PRDA testing. The 1.0 MW Cold-Side Selective Catalytic Reduction (SCR) unit remained in cold-standby this month.

  13. Columbia River System Operation Review final environmental impact statement. Appendix A: River Operation Simulation (ROSE)

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The River Operation Simulation Experts (ROSE) work group is comprised of representatives of the Corps, BPA, Reclamation, NMFS, Pacific Northwest Utilities Conference Committee (PNUCC), and Northwest Power Planning Council (NPPC). ROSE was responsible for using computer hydroregulation models to simulate the operation of the river system for all of the alternatives evaluated in screening and full scale analysis in SOR. These models are complex computer programs which sequentially route streamflows through each dam in the system, calculating the streamflows, reservoir elevations, spill, power generation and other information at each project and pertinent locations on the river system. ROSE first reviewed specifications of proposed alternatives to determine whether such alternatives were formulated adequately to be run on hydroregulation models

  14. St. Louis demonstration final report: refuse processing plant equipment, facilities, and environmental evaluations

    Energy Technology Data Exchange (ETDEWEB)

    Fiscus, D.E.; Gorman, P.G.; Schrag, M.P.; Shannon, L.J.

    1977-09-01

    The results are presented of processing plant evaluations of the St. Louis-Union Electric Refuse Fuel Project, including equipment and facilities as well as assessment of environmental emissions at both the processing and the power plants. Data on plant material flows and operating parameters, plant operating costs, characteristics of plant material flows, and emissions from various processing operations were obtained during a testing program encompassing 53 calendar weeks. Refuse derived fuel (RDF) is the major product (80.6% by weight) of the refuse processing plant, the other being ferrous metal scrap, a marketable by-product. Average operating costs for the entire evaluation period were $8.26/Mg ($7.49/ton). The average overall processing rate for the period was 168 Mg/8-h day (185.5 tons/8-h day) at 31.0 Mg/h (34.2 tons/h). Future plants using an air classification system of the type used at the St. Louis demonstration plant will need an emissions control device for particulates from the large de-entrainment cyclone. Also in the air exhaust from the cyclone were total counts of bacteria and viruses several times higher than those of suburban ambient air. No water effluent or noise exposure problems were encountered, although landfill leachate mixed with ground water could result in contamination, given low dilution rates.

  15. Savannah River Site Spent Nuclear Fuel Management Final Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2000-04-14

    The proposed DOE action considered in this environmental impact statement (EIS) is to implement appropriate processes for the safe and efficient management of spent nuclear fuel and targets at the Savannah River Site (SRS) in Aiken County, South Carolina, including placing these materials in forms suitable for ultimate disposition. Options to treat, package, and store this material are discussed. The material included in this EIS consists of approximately 68 metric tons heavy metal (MTHM) of spent nuclear fuel 20 MTHM of aluminum-based spent nuclear fuel at SRS, as much as 28 MTHM of aluminum-clad spent nuclear fuel from foreign and domestic research reactors to be shipped to SRS through 2035, and 20 MTHM of stainless-steel or zirconium-clad spent nuclear fuel and some Americium/Curium Targets stored at SRS. Alternatives considered in this EIS encompass a range of new packaging, new processing, and conventional processing technologies, as well as the No Action Alternative. A preferred alternative is identified in which DOE would prepare about 97% by volume (about 60% by mass) of the aluminum-based fuel for disposition using a melt and dilute treatment process. The remaining 3% by volume (about 40% by mass) would be managed using chemical separation. Impacts are assessed primarily in the areas of water resources, air resources, public and worker health, waste management, socioeconomic, and cumulative impacts.

  16. Columbia River System Operation Review final environmental impact statement. Appendix H: Navigation

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The Navigation Technical Appendix presents the analysis of the various SOR alternatives in terms of their potential affects on the congressionally authorized navigation system within the Columbia and Snake river waterways. The focus of the study, impacts to the authorized navigation, improvements/developments, reflects on one of the continuing historical missions of the US Army Corps of Engineers: to promote safe commercial navigation of the nation's waterways benefiting the development of commerce within the US. The study and evaluation process involved Scoping, Screening and Full Scale Evaluation. During screening two models were developed; one was used to evaluate the effects of the various alternatives on navigation through the Snake River Projects and the other the effects on the Dworshak Pool. Full Scale Analysis was expanded to included a study of effects throughout the system

  17. Final report on effects of environmental radiation of Kori nuclear power plant on human population

    International Nuclear Information System (INIS)

    Kim, Y.J.; Kim, J.B.; Chung, K.H.; Lee, K.S.; Kim, S.R.; Yang, S.Y.

    1980-01-01

    In order to clarify and protect the effects of environmental radiation according to the operation of Kori nuclear power plant on the human population, the base line survey for the human monitoring, human life habits, expected individual exposure dose, frequencies of chromosomal aberration, gene frequencies and karyotypes in amphibia, fauna, and radiation sensitivities in microorganisms which have been living around the power plant site were carried out. Kilchonri population which took for the human monitoring lie within a 2 km distance from the power plant site. Human monitoring, house and food characteristics, individual experience of x-ray exposures, human chromosome analysis and fauna were surveyed and expressed in numerical tables. Chromosome number obtained from the amphibia which were collected around the power plant area was as follows: Kaloula borealis 2N=30, Rana amurensis 2N=26, Rana dybouskii 2N=24, Rana rugosa 2N=26, Rana nigromaculata 2N=26, Rana plancyi 2N=26, Bombina orientalis 2N=24, Hyla arborea 2N=24, Bufo stejnegeri 2N=22, Bufo bufo 2N=22. (author)

  18. Tank Waste Remediation System, Hanford Site, Richland, Washington. Final environmental impact statement. Summary

    International Nuclear Information System (INIS)

    1996-08-01

    This document analyzes the potential environmental consequences related to the Hanford Site Tank Waste Remediation System (TWRS) alternatives for management and disposal of radioactive, hazardous, and mixed waste, and the management and disposal of approximately 1,930 cesium and strontium capsules located at the Hanford Site. This waste is currently or projected to be stored in 177 underground storage tanks and approximately 60 miscellaneous underground storage tanks. This document analyzes the following alternatives for remediating the tank waste: No Action, Long-Term Management, In Situ Fill and Cap, In Situ Vitrification, Ex Situ Intermediate Separations, Ex Situ No Separations, Ex Situ Extensive Separations, Ex Situ/In Situ Combination 1, and Ex Situ/In Situ Combination 2. This document also addresses a Phased Implementation alternative (the DOE and Ecology preferred alternative for remediation of tank waste). Alternatives analyzed for the cesium and strontium capsules include: No Action, Onsite Disposal, Overpack and Ship, and Vitrify with Tank Waste. The DOE and Ecology preferred alternative for the cesium and strontium capsules is the No Action alternative

  19. Cook Inlet Planning Area oil and gas lease sale 149: Final environmental impact statement. Volume 1

    International Nuclear Information System (INIS)

    1996-01-01

    This environmental impact statement (EIS) discusses a proposed oil and gas lease sale in the Cook Inlet Planning Area, analyzes its potential effects on the environment, describes alternatives, presents major issues determined through the scoping process and staff analyses, and evaluates potential mitigating measures. Descriptions of the (1) leasing and scoping process are given in Section 1, (2) alternatives and mitigating measures in Section 2, and (3) description of the environment in Section 3. The potential effects of the lease sale are analyzed in Section 4. Alternative 1, the proposed action, is based on offering for lease 402 blocks (approximately 0.8 million hectares--1.98 million acres) in lower Cook Inlet that range from about 5 to 50 kilometers (3 to 25 mi) offshore. Alterative 2 (No Lease Sale) would cancel the proposed lease sale tentatively scheduled for April 1996. Alternative 2 (Delay the Sale) would delay the proposed sale for 2 years. Alternatives 4, 5, 6, 7, 8, and 9 would defer from leasing areas adjacent to the lower Cook Inlet and northwestern Shelikof Strait: the size of areas deferred ranges from about 5 to 45% of the area proposed for Alternative 1. After a thorough review, the Secretary of the Interior will decide which alternative or combination of alternatives will be included in the Notice of Sale

  20. Final environmental impact statement, construction and operation of the Spallation Neutron Source Facility. Summary

    International Nuclear Information System (INIS)

    1999-04-01

    DOE proposes to construct and operate a state-of-the-art, short-pulsed, spallation neutron source comprised of an ion source, a linear accelerator, a proton accumulator ring, and an experiment building containing a liquid mercury target and a suite of neutron scattering instrumentation. The proposed Spallation Neutron Source would be designed to operate at a proton beam power of 1 megawatt. The design would accommodate future upgrades to a peak operating power of 4 megawatts. These upgrades may include construction of a second proton accumulator ring and a second target. This document analyzes the potential environmental impacts from the proposed action and the alternatives. The analysis assumes a facility operating at a power of 1 MW and 4 MW over the life of the facility. The two primary alternatives analyzed in this FEIS are: the proposed action (to proceed with building the Spallation Neutron Source) and the No-Action Alternative. The No-Action Alternative describes the expected condition of the environment if no action were taken. Four siting alternatives for the Spallation Neutron Source are evaluated: Oak Ridge National Laboratory, Oak Ridge, TN, (preferred alternative); Argonne National Laboratory, Argonne, IL; Brookhaven National Laboratory, Upton, NY; and Los Alamos National Laboratory, Los Alamos, NM