  1. Real options and volume uncertainty by field development projects

    Ekern, S.; Stensland, G.

    1993-12-01

    The report concerns a study on the use of option methodology in field development projects. The report shows how the value of flexibility in the different decision processes is to be found by means of real option methodology. Particular attention is laid on the uncertainty concerning the volume of reserves and production capacity. The results from the study were based on the research project dubbed ''Use of real options in field development projects''. The project is partially connected to another project dubbed ''Decisive behaviour and alternative action under uncertainty in the petroleum sector''. Main topics cover as follow: Example with volume uncertainty; real options and volume uncertainty; gradual disclosure of uncertainty in the production; value of flexible production equipment. 33 refs., 19 figs., 17 tabs

  2. The value of flexibility in offshore oil field development projects

    Lund, Morten Wattengaard

    1997-12-31

    Offshore oil field development projects often face substantial uncertainties and the operator`s ability to take corrective actions is very important. The main objective of this thesis was to identify the value of flexibility in such projects. Estimates obtained from exploratory wells can be dependent through common information. The effect of stochastic dependence was illustrated by an analytical model, where the dependence was expressed in terms of correlation between estimate errors. It was found that a high degree of correlation might distort the benefit of additional exploration. A prototype that covered the major phases of the project was developed to study the value of flexibility. The prototype was a Markov decision process, solved by stochastic dynamic programming. Based on discussions with Norwegian oil companies, three uncertain variables were addressed: the reservoir volume, the well rate, and the oil price. Simple descriptions were used to mimic the uncertainty. The reservoir was thus depicted as a tank model, and the well rate and oil prices were assumed to follow Markov processes. Flexibility was restricted to managerial as opposed to financial flexibility. Application of the prototype to a case study, based on an ongoing field development, showed that flexibility might be of considerable value to the project. In particular, capacity flexibility and initiation flexibility were identified as important aspects of the development. The results also emphasized the importance of a joint assessment, as the values of different flexibility types are not additive. In conclusion, the proposed model motivates further development of the decision support system presently available. Future decision making should therefore be made within a framework that gives consideration to flexibility. 129 refs., 46 figs., 23 tabs.

  3. EMF Rapid Program Engineering Projects, Project 1, Development of Recommendations for Guidelines for Field Source Measurement

    Electric Research and Management, Inc.

    1997-03-11

    The goal of this project is to develop a protocol for measuring the electric and magnetic fields around sources. Data from these measurements may help direct future biological effects research by better defining the complexity of magnetic and electric fields to which humanity is exposed, as well asprovide the basis for rigorous field exposure analysis and risk assessment once the relationship between field exposure and biological response. is better understood. The data base also should have sufficient spatial and temporal characteristics to guide electric and magnetic field management. The goal of Task A is to construct a set of characteristics that would be ideal to have for guiding and interpreting biological studies and for focusing any future effort at field management. This ideal set will then be quantified and reduced according to the availability (or possible development of) instrumentation to measure the desired characteristics. Factors that also will be used to define pragmatic data sets will be the cost of collecting the data, the cost of developing an adequate data base, and the needed precision in measuring specific characteristics. A field, electric or magnetic, will always be ,some function of time and space. The first step in this section of the protocol development will be to determine what span of time and what portion of space are required to quantify the electric and magnetic fields around sources such as appliances and electrical apparatus. Constraints on time will be set by examining measurement limitations and biological data requirements.

  4. High field superconductor development and understanding project, Final Report

    Larbalestier, David C.; Lee, Peter J.

    2009-07-15

    Over 25 years the Applied Superconductivity Center at the University of Wisconsin-Madison provided a vital technical resource to the High Energy Physics community covering development in superconducting strand for HEP accelerator magnet development. In particular the work of the group has been to develop the next generation of high field superconductors for high field application. Grad students Mike Naus, Chad Fischer, Arno Godeke and Matt Jewell improved our understanding of the microstructure and microchemistry of Nb3Sn and their impact on the physical and mechanical properties. The success of this work has led to the continued funding of this work at the ASC after it moved to the NHMFL and also to direct funding from BNL for some aspects of Nb3Sn cable evaluation.

  5. Development of a volumetric projection technique for the digital evaluation of field of view.

    Marshall, Russell; Summerskill, Stephen; Cook, Sharon

    2013-01-01

    Current regulations for field of view requirements in road vehicles are defined by 2D areas projected on the ground plane. This paper discusses the development of a new software-based volumetric field of view projection tool and its implementation within an existing digital human modelling system. In addition, the exploitation of this new tool is highlighted through its use in a UK Department for Transport funded research project exploring the current concerns with driver vision. Focusing specifically on rearwards visibility in small and medium passenger vehicles, the volumetric approach is shown to provide a number of distinct advantages. The ability to explore multiple projections of both direct vision (through windows) and indirect vision (through mirrors) provides a greater understanding of the field of view environment afforded to the driver whilst still maintaining compatibility with the 2D projections of the regulatory standards. Field of view requirements for drivers of road vehicles are defined by simplified 2D areas projected onto the ground plane. However, driver vision is a complex 3D problem. This paper presents the development of a new software-based 3D volumetric projection technique and its implementation in the evaluation of driver vision in small- and medium-sized passenger vehicles.

  6. 30 CFR 203.64 - How many applications may I file on a field or a development project?

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false How many applications may I file on a field or a development project? 203.64 Section 203.64 Mineral Resources MINERALS MANAGEMENT SERVICE... § 203.64 How many applications may I file on a field or a development project? You may file one complete...

  7. The Ins & Outs of Developing a Field-Based Science Project: Learning by Lassoing Lizards

    Matthews, Catherine E.; Huffling, Lacey D.; Benavides, Aerin

    2014-01-01

    We describe a field-based lizard project we did with high school students as a part of our summer Herpetological Research Experiences. We describe data collection on lizards captured, identified, and marked as a part of our mark-recapture study. We also describe other lizard projects that are ongoing in the United States and provide resources for…

  8. Cost effective solutions for field development. System supplier approach to projects and operations

    Moe, P.O.

    1994-01-01

    The conference paper outlines the most important elements for a new approach to project realisation that enable a cost reduction of 30-50% compared to conventional methods. The achievements are based on studies and evaluations to the Norwegian Vigdis development project. The system elements covered are the electrical and automation systems including safety and process control and all traditional phases of a project from concept design to the operational phase. The concept involves new principles for project execution where traditional borderlines and interfaces between the various participants have been redefined. Management attention has been verified as an important prerequisite for a successful implementation of this strategy. 2 figs

  9. Development and field evaluation of animal feed supplementation packages (AFRA project II-17 - RAF/5/041). Project summary

    Makkar, H.P.S.

    2002-01-01

    The Joint FAO/IAEA programme has supported animal production research in Africa for many years through country Technical Co-operation (TC) Projects, Regional Projects (AFRA) and Co-ordinated Research Project (CRP). These activities have helped to build up the infrastructure needed in the countries concerned to conduct much of the research in animal reproduction and nutrition. In the past the Agency has provided technical assistance in defining reproductive indices of ruminant livestock species and identifying nutritional constraints to productivity of animals maintained on smallholder farms under various topographical and environmental conditions. In view of the satisfactory progress of AFRA Project VIII in identifying the major constraints to livestock productivity in the region, and the recognition of many Member States of the importance of supplementary feeding for improving milk and meat production, a regional strategy was proposed for developing affordable and sustainable supplementation packages for improving productivity from smallholder farms using locally available feed resources. The new Regional Project was initiated in 1997 with the following objectives: 1. To produce a supplementary feed in the form of a convenient and easy-to-use package for improving milk and meat production in peri-urban areas 2. To promote the uptake of this technology through demonstrations of its advantages in terms of increased productivity and benefit: cost ratio 3. To maximize the use of locally available feed material such as molasses, cereal bran, legume tree leaves, oil seed meals, etc. for feeding ruminant livestock, thereby reducing the use of high cost concentrate feeds 4. To promote technical co-operation amongst developing countries (TCDC) in the region and take advantage of established infrastructure and available human and technical resources to solve problems of common interest. From 1997 until 2000 the project has been operational with 13 Member States

  10. Development of Procedures for Assessing the Impact of Vocational Education Research and Development on Vocational Education (Project IMPACT). Volume 8--A Field Study of Predicting Impact of Research and Development Projects in Vocational and Technical Education.

    Malhorta, Man Mohanlal

    As part of Project IMPACT's effort to identify and develop procedures for complying with the impact requirements of Public Law 94-482, a field study was conducted to identify and validate variables and their order of importance in predicting and evaluating impact of research and development (R&D) projects in vocational and technical education.…

  11. Voices from the Field: Developing Employability Skills for Archaeological Students Using a Project Based Learning Approach

    Wood, Gaynor

    2016-01-01

    Graduate employment statistics are receiving considerable attention in UK universities. This paper looks at how a wide range of employability attributes can be developed with students, through the innovative use of the Project Based Learning (PjBL) approach. The case study discussed here involves a group of archaeology students from the University…

  12. Assessment of the Appalachian Basin Geothermal Field: Combining Risk Factors to Inform Development of Low Temperature Projects

    Smith, J. D.; Whealton, C.; Camp, E. R.; Horowitz, F.; Frone, Z. S.; Jordan, T. E.; Stedinger, J. R.

    2015-12-01

    Exploration methods for deep geothermal energy projects must primarily consider whether or not a location has favorable thermal resources. Even where the thermal field is favorable, other factors may impede project development and success. A combined analysis of these factors and their uncertainty is a strategy for moving geothermal energy proposals forward from the exploration phase at the scale of a basin to the scale of a project, and further to design of geothermal systems. For a Department of Energy Geothermal Play Fairway Analysis we assessed quality metrics, which we call risk factors, in the Appalachian Basin of New York, Pennsylvania, and West Virginia. These included 1) thermal field variability, 2) productivity of natural reservoirs from which to extract heat, 3) potential for induced seismicity, and 4) presence of thermal utilization centers. The thermal field was determined using a 1D heat flow model for 13,400 bottomhole temperatures (BHT) from oil and gas wells. Steps included the development of i) a set of corrections to BHT data and ii) depth models of conductivity stratigraphy at each borehole based on generalized stratigraphy that was verified for a select set of wells. Wells are control points in a spatial statistical analysis that resulted in maps of the predicted mean thermal field properties and of the standard error of the predicted mean. Seismic risk was analyzed by comparing earthquakes and stress orientations in the basin to gravity and magnetic potential field edges at depth. Major edges in the potential fields served as interpolation boundaries for the thermal maps (Figure 1). Natural reservoirs were identified from published studies, and productivity was determined based on the expected permeability and dimensions of each reservoir. Visualizing the natural reservoirs and population centers on a map of the thermal field communicates options for viable pilot sites and project designs (Figure 1). Furthermore, combining the four risk

  13. Project development symposium

    1983-01-01

    Papers were presented on the following: project evaluation; case studies - minerals; finance; applied finance; legal; manpower/industrial relations; and new technologies. Those papers on the coal industry were: mine planning for coal project development; the planning and management of a lignite exploration contract in Thailand; development of the West Cliff extended project; Ulan: a resource development; Saxonvale mine development a case study in project planning and project management; the role of marketing in the development of a new coal project; technical support for coal marketing; infrastructure development for the Ulan project; underground mine project developments; the bucketwheel excavator at Goonyella - a case study; tax aspects of mining development projects; cost of capital mining development projects; and trends in development project finance. 16 papers were abstracted separately.

  14. An empirical study on key factors for purchasing strategy on project based organizations: A case study of gas field development projects

    Aboulfazl Kazazi

    2012-08-01

    Full Text Available One of the primary concerns in development of oil and gas resources is to find the critical success factors associated with different important projects. Purchasing and procurement plays a key role in these projects. There is no doubt that in history of similar studies, there are not much studies to determine key factors. The proposed study of this paper presents an empirical study to find these factors in one of the most important gas filed in Iran is now South Pars Gas Field. The study distributes a questionnaire consists of various questions associated with purchasing activities. We investigate the feedbacks gathered from decision makers using factor analysis. The results of our survey reveal that there are three categories of organizational strategy, the relative importance of strategy and risk according to factor analysis. Each factor consists of many other factors and the relative importance of all factors are investigated.

  15. The formation of a risk management system for projects in the field of aquaculture innovative development in the Kaliningrad region: a case study

    Serbulov Alexey

    2012-03-01

    Full Text Available This article sets out to develop the concept and the principal scheme of the formation of a risk management system for innovative economic development projects in the field of aquaculture. The research carried out by the authors helps identify the main problems and characteristics of risk management projects for the development of aquaculture in presentday Russia. The authors outline the status and features of aquaculture development projects in the North-western federal district and the Kaliningrad region. The article formulates and justifies the concept of “risk management projects in innovative development of aquaculture in the region” focusing on the classification of aquaculture risks in relation to innovative development projects, which expands the conceptual framework of risk management in view of the specific risks relating to economic development projects in the field of aquaculture. The authors characterize modern methods and approaches to risk management projects and organizations in the context of their application in the framework of aquaculture development projects and offer mechanisms for risk management of aquaculture development projects, which make it possible to include risk management activity in the general context of activities of parent project organizations. The authors develop the concept and principal scheme of the formation of risk management system for innovative development projects in aquaculture.

  16. Affine-projective field laws

    Murphy, G.L.

    1975-01-01

    The general topic of geometric unified field theories is discussed in the first section. Some reasons are given for pursuing such theories, and some criticisms are considered. The second section develops the fundamental equations of a purely affine theory which is invariant under projective transformations of the affine connection. This theory is a generalization of that of Schrodinger. Possible identifications for the space-time metric are considered in Sec. III. Sections IV and V deal with the limits of pure gravitation and electrodynamics. In the symmetric limit, Einstein's vacuum equations with cosmological term are recovered. The theory also contains a generalized electrodynamic set of equations which is very similar to the Born-Infeld set. In the weak-field approximation, a finite mass must be attributed to the photon. The problem of motion for charges is discussed here, and it is argued that criticisms of unified field theories because of a supposed inability to produce the Lorentz force law are probably not justified. Three more speculative sections deal with possible explanations of nuclear forces, the spin-torsion relation, and particle structure

  17. Developing an outcome-based biodiversity metric in support of the field to market project: Final report

    Drew, C. Ashton; Alexander-Vaughn, Louise B.; Collazo, Jaime A.; McKerrow, Alexa; Anderson, John

    2013-01-01

    depends on that animal’s resource specialization, mobility, and life history strategies (Jeanneret et al. 2003a, b; Jennings & Pocock 2009). The knowledge necessary to define the biodiversity contribution of agricultural lands is specialized, dispersed, and nuanced, and thus not readily accessible. Given access to clearly defined biodiversity tradeoffs between alternative agricultural practices, landowners, land managers and farm operators could collectively enhance the conservation and economic value of agricultural landscapes. Therefore, Field to Market: The Keystone Alliance for Sustainable Agriculture and The Nature Conservancy jointly funded a pilot project to develop a biodiversity metric to integrate into Field to Market’s existing sustainability calculator, The Fieldprint Calculator (http://www. fieldtomarket.org/). Field to Market: The Keystone Alliance for Sustainable Agriculture is an alliance among producers, agribusinesses, food companies, and conservation organizations seeking to create sustainable outcomes for agriculture. The Fieldprint Calculator supports the Keystone Alliance’s vision to achieve safe, accessible, and nutritious food, fiber and fuel in thriving ecosystems to meet the needs of 9 billion people in 2050. In support of this same vision, our project provides proof-of-concept for an outcome-based biodiversity metric for Field to Market to quantify biodiversity impacts of commercial row crop production on terrestrial vertebrate richness. Little research exists examining the impacts of alternative commercial agricultural practices on overall terrestrial biodiversity (McLaughlin & Mineau 1995). Instead, most studies compare organic versus conventional practices (e.g. Freemark & Kirk 2001; Wickramasinghe et al. 2004), and most studies focus on flora, avian, or invertebrate communities (Jeanneret et al. 2003a; Maes et al. 2008; Pollard & Relton 1970). Therefore, we used an expert-knowledge-based approach to develop a metric that predicts

  18. Proposal for the risk management implementation phase in oil field development project by adding value on the refurbishment of critical equipment

    Hamid Abdul

    2017-01-01

    Full Text Available Refurbishment process is a conceptual stage in product life cycle. It is utilized in existing equipment in the field by adding value to recondition and repaired equipment. The main interest of this paper is to implement and design risk management implementation phase in oil field development project on the refurbishment of critical equipment in oil and gas industry. This paper is provided base on research and experiences in risk management and learned from practical team in industry which matched by an application in oil field development project in refurbishment of critical equipment. A framework of implementation phase for risk management in oil field development project in refurbishment critical equipment were reviewed and added value on communication skills of the project team to the stakeholder and organization, which support to external body and vice-versa. Risk management framework can be used for reference of refurbishment process with simply process and developed with same concept for the next wide development project in industry.

  19. Niland development project geothermal loan guaranty: 49-MW (net) power plant and geothermal well field development, Imperial County, California: Environmental assessment

    1984-10-01

    The proposed federal action addressed by this environmental assessment is the authorization of disbursements under a loan guaranteed by the US Department of Energy for the Niland Geothermal Energy Program. The disbursements will partially finance the development of a geothermal well field in the Imperial Valley of California to supply a 25-MW(e) (net) power plant. Phase I of the project is the production of 25 MW(e) (net) of power; the full rate of 49 MW (net) would be achieved during Phase II. The project is located on approximately 1600 acres (648 ha) near the city of Niland in Imperial County, California. Well field development includes the initial drilling of 8 production wells for Phase I, 8 production wells for Phase II, and the possible need for as many as 16 replacement wells over the anticipated 30-year life of the facility. Activities associated with the power plant in addition to operation are excavation and construction of the facility and associated systems (such as cooling towers). Significant environmental impacts, as defined in Council on Environmental Quality regulation 40 CFR Part 1508.27, are not expected to occur as a result of this project. Minor impacts could include the following: local degradation of ambient air quality due to particulate and/or hydrogen sulfide emissions, temporarily increased ambient noise levels due to drilling and construction activities, and increased traffic. Impacts could be significant in the event of a major spill of geothermal fluid, which could contaminate groundwater and surface waters and alter or eliminate nearby habitat. Careful land use planning and engineering design, implementation of mitigation measures for pollution control, and design and implementation of an environmental monitoring program that can provide an early indication of potential problems should ensure that impacts, except for certain accidents, will be minimized.

  20. Helwan University Project Developing Primary School Pupils' Abilities and Skills at Some Egyptian Underprivileged Areas (Slums). (Field Study)

    El-Tayeb, Mahmoud N.; El Nashar, Mohamed; Zeid, Mai M.; El-Sayed, Magda; Ramadan, Mohamed A.; Hamdi, Safia M.; El-Affy, Nabila; Ebeid, Amina K.; El-Marasi, Sonia S.; Abou-Elmahty, Maher

    2010-01-01

    Through directing concerted efforts and educational services of seven Faculties of Helwan University towards socially underprivileged pupils in slum areas (EL-Marg area in big Cairo) this research project had two main aims: firstly, modifying a set of arbitrary behaviors of those pupils, in a trial to develop some behavior skills associated with…

  1. DEFORMATION FIELD OF COMPETENCE IN INNOVATIVE PROJECTS

    Сергей Дмитриевич БУШУЕВ

    2017-03-01

    Full Text Available The use of a competence-based approach in the programs of innovative development organizations is considered. An analysis of the latest achievements in the world and Ukraine in the field of application of the competency approach in the programs of organizational development is done. The principles of Bloom's taxonomy to generate fields of competence and expertise are given. The principle of the curvature of field of competencies in innovative projects and programs is formulated. Application of the model taking into account the deformation of the competencies of the field allows to increase the accuracy of the model and to determine the trajectory of development of competence of project managers, teams, and organizations. An example of an organization competency assessment based on IPMA Delta model is given. The successful implementation of innovative projects and programs provided by the creative use of competency approach. This approach can be used as a common language of communication, which brings together the organization and employees, tasks and performers. Thus the development of the organization and development of personnel takes place at the same time.

  2. Oluvil Port Development Project

    Frigaard, Peter; Margheritini, Lucia

    Oluvil Port Development Project is the first development of a large port infrastructure in the entire eastern coastline of Sri Lanka. The project is supported by the Danish Foreign Ministry. Feasibility studies and detailed design studies were carried out by Lanka Hydraulic Institute Ltd during...... the years 1995 to 2003. The design was reviewed by COWI a/s. Construction of the port was started in 2008. MT Højgaard a/s acted as contractor. The outer breakwaters were constructed as first part of the project. During and after completion of the breakwaters a serious beach erosion and sand accumulation...... has been observed. Severe erosion is seen north of the harbour and some accumulation of sand is seen south of the harbour. On a sandy coastline like the one in Oluvil such erosion problems as observed are very typical. The report: Oluvil Port Development Project: Studies on Beach Erosion written...

  3. Renewable energy project development

    Ohi, J.

    1996-12-31

    The author presents this paper with three main thrusts. The first is to discuss the implementation of renewable energy options in China, the second is to identify the key project development steps necessary to implement such programs, and finally is to develop recommendations in the form of key issues which must be addressed in developing such a program, and key technical assistance needs which must be addressed to make such a program practical.

  4. The North Field Development

    1993-01-01

    The Qatar Europe LNG Company's activities include gas production, gathering, treatment, liquefaction, shipping and marketing of Liquefied Natural Gas (LNG) and by-products. The (LNG) project to be developed by the Company shall be initially capable of processing 1200 mmscfd of raw gas and associated quantities of condensate from the North Field. Hydrocarbons produced will be delivered to shore in the industrial area (Ras Laffan) via a sub sea pipeline system. Raw gas is used as a feedstock into the liquefaction plant which is initially capable of producing 6.1 Million Tonnes Per Annum (MTPA) of (LNG). The initial quantity of (LNG) will be exported from (Ras Laffan) loading terminal to a receiving terminal located on the North East coast of Italy via a dedicated fleet of (LNG) carriers. The whole project (Upstream, Downstream and Shipping) shall be executed on an integrated scheme basis under the the direct control of the Qatar Europe LNG Company and in accordance with the overall Master Schedule in order to ensure a delivery of first shipment of (LNG) in the 2 nd half of 1997. 3 figs

  5. Energy Efficiency Project Development

    IUEP

    2004-03-01

    The International Utility Efficiency Partnerships, Inc. (IUEP) has been a leader among the industry groups that have supported voluntary initiatives to promote international energy efficiency projects and address global climate change. The IUEP maintains its leadership by both supporting international greenhouse gas (GHG) reduction projects under the auspices of the U.S. Department of Energy (DOE) and by partnering with U.S. and international organizations to develop and implement strategies and specific energy efficiency projects. The goals of the IUEP program are to (1) provide a way for U.S. industry to maintain a leadership role in international energy efficiency infrastructure projects; (2) identify international energy project development opportunities to continue its leadership in supporting voluntary market-based mechanisms to reduce GHG emissions; and (3) demonstrate private sector commitment to voluntary approaches to global climate issues. The IUEP is dedicated to identifying, promoting, managing, and assisting in the registration of international energy efficiency projects that result in demonstrated voluntary reductions of GHG emissions. This Final Technical Report summarizes the IUEP's work in identifying, promoting, managing, and assisting in development of these projects and IUEP's effort in creating international cooperative partnerships to support project development activities that develop and deploy technologies that (1) increase efficiency in the production, delivery and use of energy; (2) increase the use of cleaner, low-carbon fuels in processing products; and (3) capture/sequester carbon gases from energy systems. Through international cooperative efforts, the IUEP intends to strengthen partnerships for energy technology innovation and demonstration projects capable of providing cleaner energy in a cost-effective manner. As detailed in this report, the IUEP met program objectives and goals during the reporting period January 1

  6. Sniffer project development

    Grau, S; CERN. Geneva. ST Division

    2002-01-01

    To ensure the safety of the personnel, and prevent major damage to the equipment in the LHC experiments, a combined fire and gas detection system is being developed in conjunction with the industry. This system named SNIFFER, shall detect fire, flammable gas leaks and oxygen deficiency. In addition it shall interface with the Experiments' Control System and the CERN Safety Alarm Monitoring system. The SNIFFER project is currently at the end of the prototyping phase, and the technical specification is being written for the outsourcing of the system. The purpose of this document is to describe the main functions, constraints and interfaces of the system, to present the status report and planning of the project, and to explain the preliminary conclusions of the prototyping phase.

  7. Gypsy Field project in reservoir characterization

    Castagna, John P.; Jr., O' Meara, Daniel J.

    2000-01-12

    The overall objective of this project was to use extensive Gypsy Field Laboratory and data as a focus for developing and testing reservoir characterization methods that are targeted at improved recovery of conventional oil. This report describes progress since project report DOE/BC/14970-7 and covers the period June 1997-September 1998 and represents one year of funding originally allocated for the year 1996. During the course of the work previously performed, high resolution geophysical and outcrop data revealed the importance of fractures at the Gypsy site. In addition, personnel changes and alternative funding (OCAST and oil company support of various kinds) allowed the authors to leverage DOE contributions and focus more on geophysical characterization.

  8. Osnovy formirovanija sistemy upravlenija riskami proektov innovacionnogo razvitija akvakul'tury v regione (Na primere Kaliningradskoj oblasti [The formation of a risk management system for projects in the field of aquaculture innovative development in the Kaliningrad region: a case study

    Serbulov Alexey

    2012-01-01

    Full Text Available This article sets out to develop the concept and the principal scheme of the formation of a risk management system for innovative economic development projects in the field of aquaculture. The research carried out by the authors helps identify the main problems and characteristics of risk management projects for the development of aquaculture in presentday Russia. The authors outline the status and features of aquaculture development projects in the North-western federal district and the Kaliningrad region. The article formulates and justifies the concept of “risk management projects in innovative development of aquaculture in the region” focusing on the classification of aquaculture risks in relation to innovative development projects, which expands the conceptual framework of risk management in view of the specific risks relating to economic development projects in the field of aquaculture. The authors characterize modern methods and approaches to risk management projects and organizations in the context of their application in the framework of aquaculture development projects and offer mechanisms for risk management of aquaculture development projects, which make it possible to include risk management activity in the general context of activities of parent project organizations. The authors develop the concept and principal scheme of the formation of risk management system for innovative development projects in aquaculture.

  9. Magnetic field dosimeter development

    Lemon, D.K.; Skorpik, J.R.; Eick, J.L.

    1980-09-01

    In recent years there has been increased concern over potential health hazards related to exposure of personnel to magnetic fields. If exposure standards are to be established, then a means for measuring magnetic field dose must be available. To meet this need, the Department of Energy has funded development of prototype dosimeters at the Battelle Pacific Northwest Laboratory. This manual reviews the principle of operation of the dosimeter and also contains step-by-step instructions for its operation

  10. Pilot Project: analysis, development and projection

    Tapia Abril, Verónica Emilia; Chérrez Rodas, Karina; García Pesántez, Gabriela Rosana; Maldonado Marchán, María Elisa; Bustamante Montesdeoca, José Luis

    2014-01-01

    Since the introduction of ICT in architecture and teaching, pedagogies of education have faced their learning paradigms change. Institutes of higher education have folded to this motion and have undergone a process of change by implementing multimedia elements in their subjects. Through the pilot project educational videos that aim to meet the highest standards of educational videos described by Van Dam have been developed. The project expects to generate educational videos for different depa...

  11. National research and development project. Report on evaluation of research and development of remotely controlled excavators for highly deep submarine oil fields; Ogata kenkyu kaihatsu project. Daishindo enkaku sosa kaitei sekiyu kussaku sochi no kenkyu kaihatsu ni kakawaru hyoka hokokusho

    NONE

    1976-02-04

    Described herein are results of evaluation of the developed excavators remotely controlled for highly deep submarine oil fields. The excavator system was designed to work at the target water depth of 200 to 250 m and excavation depth of 8,000 to 9,000 m, though not quite satisfactorily. There were several practical problems to be solved, e.g., those found in accuracy of reentry in the excavated section, cables connecting the driving equipment to the excavated section, and entangled hoses. The works were divided and system was configured in an attempt to secure all-weather type serviceability and to improve economic viability. The other major works included attempts to improve equipment functions and reduce manpower cost. Nevertheless, however, the construction cost was considered to be higher than expected, and no firm prospect was obtained whether the new excavator system was economically competitive with the conventional rig. The factors that pushed up the construction cost were various facilities needed by the new system with the separated excavation and driving sections, e.g., those facilities for helping the system land on the sea bottoms, material supply/storage facilities, and automated/unmanned facilities. The system failure and other items related to reliability are no clearly understood, making it difficult to compare it with the conventional rig in service factor. It was not adequate, therefore, to advance the next R and D phase as planned, and decided that the project was suspended to see the world development trends, because the clear plans for the future could not be drawn at that time. (NEDO)

  12. Development of Košice Region by Implementation of Environmental Projects in the Field of Water Management - Case Study

    Pavolová Henrieta

    2014-12-01

    Full Text Available The development of the regions in Slovakia in recent years has significant disparities in both so-cio-economic as well as environmental issues, as evidenced by the eight environmentally polluted areas (these areas are highly urbanised with industrial agglomerations or intensive agricultural production.

  13. Proposal for an IAEA - sponsored project of interregional co-operation for training of nuclear scientists in developing countries, using the expertise available in the nuclear data field

    Kocherov, N.; Schmidt, J.J.

    1980-07-01

    During the Winter College on Nuclear Physics and Reactors jointly organized by the IAEA and the International Centre for Theoretical Physics (ICTP) in January - March 1980 and held at the ICTP in Trieste, a Working Group was convened from participants in the Interregional Advanced Training Course on Applications of Nuclear Theory to Nuclear Data Calculations for Reactor Design. The Working Group examined the current fast neutron nuclear data requirements for nuclear technologies and discussed possible means to meet these requirements, with a major emphasis on the possible contributions by and benefit for the developing countries. The Working Group concluded that the organisation of an IAEA-sponsored Project of Interregional Co-operation for Training of Nuclear Scientists in Developing Countries, Using the Expertise Available in the Nuclear Data Field, would be the best solution to cope with the problems in question and drafted an outline of the technical programme and organization of such a project the revised version of which is presented in this report

  14. Wind power development field test project at Hirashima, Sakito-cho. Detailed wind characteristics survey; Sakitocho Hirashima ni okeru furyoku kaihatsu field test jigyo (fukyo seisa) hokokusho

    NONE

    1999-11-01

    A detailed wind characteristics survey was conducted at Hirashima, Sakito-cho, Nishisonogi-gun, Nagasaki Prefecture, on the assumption that a wind power generation system would be constructed. The survey was a 1-year project from October 1998 through September 1999, and wind characteristics such as the average wind speed, average wind direction, standard deviation of wind velocity, and the maximum instantaneous wind speed were observed. The observation point was fixed at 20m above ground, the minimum time unit for observation was 10 minutes, and the 10-minute average value was defined as the measured value. For the maximum instantaneous wind speed, the minimum time unit for observation was set to be 2 seconds. The yearly average wind speed was 7.1m/s and the maximum wind speed in the period was 37m/s. Winds came prevalently from N (13.9%), and then from NNE (13.3%), NW (12.2%), and NE (10.7%). The total wind direction occurrence rate involving the 4 directions was 50.1%. Turbulence intensity was 0.14 at wind speed 2.0m/s or more and 0.12 at wind speed 4.0m/s or more. Estimated wind turbine yearly operating factors of 77-87% were obtained using rated values of a 150kW, 300kW, and 750kW-class wind turbines. (NEDO)

  15. Wind power development field test project at Ashibe-cho. Detailed wind characteristics survey; Ashibecho ni okeru furyoku kaihatsu field test jigyo (fukyo seisa) hokokusho

    NONE

    1999-11-01

    A detailed wind characteristics survey was conducted at Ashibe-cho, Iki-gun, Nagasaki Prefecture, on the assumption that a wind power generation system would be constructed. The survey was a 1-year project from October 1998 through September 1999, and wind characteristics such as the average wind speed, average wind direction, standard deviation of wind velocity, and the maximum instantaneous wind speed were observed. The observation point was fixed at 20m above ground, the minimum time unit for observation was 10 minutes, and the 10-minute average value was defined as the measured value. For the maximum instantaneous wind speed, the minimum time unit for observation was set to be 2 seconds. The yearly average wind speed was 5.8m/s and the maximum wind speed in the period was 35m/s. Winds came from the prevailing direction of NE (21.3%), and then from NNE (14.7%) and ENE (7.9%). The wind axis was in the NE-SW direction, and the total wind direction occurrence rate from the 6 directions was 60.2%. Turbulence intensity was 0.19 at wind speed 2.0m/s or more and 0.17 at wind speed 4.0m/s or more. Estimated wind turbine yearly operating factors of 66-84% were obtained using rated values of a 150kW, 300kW, and 750kW-class wind turbines. (NEDO)

  16. SIYAZAMA ENTREPRENEURIAL DEVELOPMENT PROJECT ...

    course of planning, implementation and evaluation are presented. Identification of challenges ..... 2012. 113. Most participants in the Siyazama project live in informal housing with an average of six ..... The contributions of educational psychology to school psychology. In: T.B. Gutkin & C.R. Reynolds (eds.), The handbook of ...

  17. Report on the field test project for wind power development at Kamiyaku Town (wind characteristics investigation); Kamiyakucho ni okeru furyoku kaihatsu field test jigyo (fukyo seisa) hokokusho

    NONE

    1998-11-01

    Wind characteristics are observed for a year at the above town located at the northern end of the Yakushima island, Kagoshima Prefecture. The exponential index of the wind speed distribution in the vertical direction is 6.06 with all the directions averaged, and is so high as 8.4/13.6 in the wind directions (W/E). Prudence should be exercised, when to estimate the wind speed at the wind turbine hub altitude, against disjunction from the simple exponential law due to geographical peculiarities of the observation location. Turbulence intensity is low and is 0.15 when the wind speed is 2m/s or more, not exerting an ill effect on wind power development. As for the total wind direction occurrence rate on the prevalent wind axis, 78.2% is recorded, which is much higher than the reference value (60%). The average wind speed on this wind axis is high, and this shows that the location is quite suitable for wind power development. The annual average wind speed of 6.3m/s is much higher than the reference value, this again promising a success. The wind energy density of 478W/m{sup 2} is sufficiently high, as compared with the reference value (215W/m{sup 2}). Since there are possibilities of a maximum instantaneous wind speed of over 60m/s, caution is to be used in determining wind endurance for the wind turbine design. The annual capacity ratios for the 150/300/750kW wind turbine models are 33.8/36.5/36.9%, respectively, higher than the NEDO-provided reference value (17% or higher) and predicting sufficient power generation. (NEDO)

  18. Report on the field test project for wind power development at Yaku Town (wind characteristics investigation); Yakumachi ni okeru furyoku kaihatsu field test jigyo (fukyo seisa) hokokusho

    NONE

    1998-11-01

    Wind characteristics are observed for a year at Yakushima Young Travellers' Village of the above-named town, Kagoshima Prefecture. The exponential index of the wind speed distribution in the vertical direction is between 1.6 and 4.7, or 3.5 on the average, relatively small due probably to the peculiar terrain and causing no trouble in the development. Turbulence intensity is 0.16 at when the wind speed is 2m/s or more, low enough to meet the reference value (0.30 or less). The total occurrence rate on the prevalent wind axis (SSE-NNW) is 48%, falling short of the reference value (60% or more). The average wind speed in the prevalent wind direction is high and the wind energy density concentrates on the prevalent wind axis, this showing that the site is good for wind power development. The annual average wind speed is 5.6m/s, slightly lower than the reference value (5.8m/s or more). Since there are possibilities of a maximum instantaneous wind speed of over 60m/s, caution is to be used in determining the wind endurance level for the wind turbine design. The annual wind energy density is 325W/m{sup 2}, fully meeting the reference value (215W/m{sup 2} or more). The annual operation rates of the 150/300/750kW wind turbine models are 61/65/80%, and these meet the reference value (45% or more). Their annual capacity ratios are 24.5/26.6/27.7%, and these again meet the reference value (17% or more). (NEDO)

  19. Development and field evaluation of animal feed supplementation packages. Proceedings of the final review meeting of an IAEA Technical Co-operation Regional AFRA Project

    2002-06-01

    evaluate reproductive performance in animals that are subjected to different feed supplementation strategies. It was, however, realised that this technique has potential to monitor and improve existing support services to livestock farmers such as artificial insemination and to introduce new services such as early diagnosis of non-pregnancy and infertility. In order to ensure future sustainability of the RIA for use in such applications, the work on the second component has now been taken under a new project (RAF/5/046). This publication contains the results presented by the scientists of National Agricultural Research Systems of African countries who participated in the Final Review meeting held in Cairo, Egypt from 25 to 29 November 2000, which dealt with only the nutrition component, Development and Field Evaluation of Feed Supplementation Strategies. This publication also contains some selected papers presented at the National Training Workshop on Field Evaluation and Development of the Dry Season Feed Supplementation Packages for Ruminant Animals in the Traditional Smallholder Farms organized with financial assistance from the IAEA, from 25 to 29 July 1999, in Lusaka, Zambia

  20. Report on the field test project for wind power development at Soyo Town (wind characteristics investigation); Soyomachi ni okeru furyoku kaihatsu field test jigyo (fukyo seisa) hokokusho

    NONE

    1998-11-01

    Wind characteristics are observed for a year at Soyo Town, Aso-gun, Kumamoto Prefecture. The annual average wind speed is 5.9m/s and 5.6m/s at 20m and 10m above ground, respectively, satisfying the reference values of 5.6m/s and 5.0m/s. The prevalent wind direction is WNW (occurrence rate: 32.8%). The wind from the directions with WNW at their middle occupies 75%, stable and satisfying the reference value of 60%. Strong winds come frequently from the direction of high occurrence, which is advantageous in arranging plural wind turbine systems. The exponential index in the wind speed vertical distribution is 13.3, but wind distribution is not simple at a mountain top site like the observation station in this report. Wind characteristics are similar to those at places with mild inundations, and the maximum instantaneous wind speed of 40.8m/s will not pose a problem. The wind energy density is 205W/m{sup 2}, satisfying the reference value of 150. Wind power systems of 150kW, 300kW, and 750kW are assumed. When the exponential index is 13.3, their annual operation rates will be 70%, 71%, and 82%; and their capacity ratios are 22.6%, 23.9%, and 22.9%, all satisfying the reference values. They will collect 297MWh, 629MWh, and 1507MWh of wind energy per year. It is concluded that Soyo Town is fully qualified as a site for wind power development. (NEDO)

  1. Kazakhstan innovation projects in nuclear technologies field

    Shkol'nik, V.S.; Tukhvatulin, Sh.T.

    2005-01-01

    At present in the Republic of Kazakhstan in preparation and realization stage there are several innovation projects related with use of advanced nuclear technologies. Projects are as follows: 'Implementation of Kazakhstan thermonuclear reactor tokamak (KTM)'; 'Implementation at the L.N. Gumilev Eurasian National University the inter-disciplinary research complex on the heavy ions accelerator base'; 'Development of the Technological Park 'Nuclear Technologies Center in Kurchatov city'; 'Development the first in the Central-Asian region Center of Nuclear Medicine and Biophysics'. The initiator and principal operator of these projects is the National Nuclear Center of the Republic of Kazakhstan

  2. CANDU project development

    Hedges, K R [Atomic Energy of Canada Ltd., Mississauga, ON (Canada)

    1996-12-31

    Advanced CANDU reactor design strategy follows an evolutionary approach, taking manageable steps in the development of power plants from today`s available designs, and in parallel carrying out longer-term studies to develop future-generation reactor concepts. The major emphasis is on safety, on on reducing cost and schedule. New features are developed and thoroughly proof-tested before introduction into designs, in order to maximize owner confidence. (author). 4 figs.

  3. CANDU project development

    Hedges, K.R.

    1995-01-01

    Advanced CANDU reactor design strategy follows an evolutionary approach, taking manageable steps in the development of power plants from today's available designs, and in parallel carrying out longer-term studies to develop future-generation reactor concepts. The major emphasis is on safety, on on reducing cost and schedule. New features are developed and thoroughly proof-tested before introduction into designs, in order to maximize owner confidence. (author). 4 figs

  4. Gamification in Software Development Projects

    Platonova Valērija

    2017-12-01

    Full Text Available Gamification is one of the many ways to motivate employees and introduce more fun in daily activities. The aim of the paper is to analyse the impact of gamification method on the software development projects. The paper contains results of a literature review about application areas of gamification, methods, positive and negative effects on projects. The paper also presents an overview of the gamification tools used in software development projects and attempts to answer the question about benefits of gamification usage: whether gamification in the project leads to the desired results and increases the employee productivity and motivation.

  5. Catalyzing RE Project Development

    Anderson, Kate; Elgqvist, Emma; Walker, Andy; Cutler, Dylan; Olis, Dan; DiOrio, Nick; Simpkins, Travis

    2016-09-01

    This poster details how screenings done with REopt - NREL's software modeling platform for energy systems integration and optimization - are helping to catalyze the development of hundreds of megawatts of renewable energy.

  6. Developing Government Renewable Energy Projects

    Kurt S. Myers; Thomas L. Baldwin; Jason W. Bush; Jake P. Gentle

    2012-07-01

    The US Army Corps of Engineers has retained Idaho National Laboratory (INL) to conduct a study of past INL experiences and complete a report that identifies the processes that are needed for the development of renewable energy projects on government properties. The INL has always maintained expertise in power systems and applied engineering and INL’s renewable energy experiences date back to the 1980’s when our engineers began performing US Air Force wind energy feasibility studies and development projects. Over the last 20+ years of working with Department of Defense and other government agencies to study, design, and build government renewable projects, INL has experienced the do’s and don’ts for being successful with a project. These compiled guidelines for government renewable energy projects could include wind, hydro, geothermal, solar, biomass, or a variety of hybrid systems; however, for the purpose of narrowing the focus of this report, wind projects are the main topic discussed throughout this report. It is our thought that a lot of what is discussed could be applied, possibly with some modifications, to other areas of renewable energy. It is also important to note that individual projects (regardless the type) vary to some degree depending on location, size, and need but in general these concepts and directions can be carried over to the majority of government renewable energy projects. This report focuses on the initial development that needs to occur for any project to be a successful government renewable energy project.

  7. Project fuel development

    Stratton, R.W.

    1981-05-01

    The activities continued on lab-scale production of uranium-plutonium carbide fuel for the fast reactor using gelation methods, irradiation testing and performance evaluation. Whereas in earlier years a balance was maintained between research and development or with emphasis on research, 1980 was marked by a concentrated equipment development effort for an increased throughput with improved process control and product reproducability and installation of new equipment for large pin fabrication. (Auth.)

  8. Project Success in Agile Development Software Projects

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  9. Knowledge Creation Through Development Projects

    Laursen, Erik

    2010-01-01

    The focus of the paper is set on efforts to produce and manage organizational learning and development through engagement in organizational development projects, involving the implementation of new methods, new technologies and new ways of organizing the work processes. The issues discussed...... study of four organizational development projects (covering the organizations as a whole) held by four Danish High Schools (“gymnasium”). The study included questionnaires as well as interviews with the management and staff, plus a survey of selected written materials and documents. The purpose...... of the paper is to describe the activities, actually organized by the projects., as well as the various ways in which different groupings among the staff and the management are relating to the project. A special focus is set on the different perspectives on the projects established by the staff...

  10. Field experience of a project with the Dutch Consultancy Services Wind Energy Developing Countries (CWD) and traditional wind pumps in Nicaragua

    Holtslag, H.A.G.

    1991-01-01

    The main objective of the title project, which started in October 1986, was to promote the use of wind energy in Nicaragua by means of a study on the wind potential, the production and use of wind pumps, and repairs of traditional wind pumps. Involved in the project were a Dutch project coordinator, a Dutch, a German and a Danish advisor for the technical aspects and a Dutch advisor for irrigation. The Nicaraguan National Institute of Energy coordinated the project until 1988. Then the (state) factory, where the mills were manufactured, took over. The study on the wind potential was only partly completed. The production was done at the state factory in Managua (IMEP), where two models were produced: a traditional mill with a rotor of 3 meter, and a CWD-mill with a rotor of 5 meter. Adaptations, based on field experiences, were made in the CWD-model in the third year of the project. The total production after 4 years was 50 mills of 3 meter and 15 mills of 5 meter. The objective was 200 mills per year after the third year of the project. Of the 3 meter mill, 35 were installed and used mainly for cattle watering (sales price US$ 2,200). Of the 5 meter mill, 7 were installed in demonstration projects for small-scale irrigation (sales price US$ 4,000). The production rate of the 3 meter mill at the end of the project was 10 mills per 8 weeks. Production of the 5 meter mill stopped for several reasons, but may go on when adaptations in the mill prove to be effective. Repairs of the traditional mills could not be realized. The overall conclusion is that the achievements of the project were lower than the original objectives for reasons which are formulated in the conclusions. 3 ills

  11. Incentive contracts for development projects

    Finley, David T.; Smith, Byron; DeGroff, B.

    2012-09-01

    Finding a contract vehicle that balances the concerns of the customer and the contractor in a development project can be difficult. The customer wants a low price and an early delivery, with as few surprises as possible as the project progresses. The contractor wants sufficient cost and schedule to cover risk. Both want to clearly define what each party will provide. Many program offices do not want to award cost plus contracts because their funding sources will not allow it, their boards do not want an open ended commitment, and they feel like they lose financial control of the project. A fixed price incentive contract, with a mutually agreed upon target cost, provides the owner with visibility into the project and input into the execution of the project, encourages both parties to save costs, and stimulates a collaborative atmosphere by aligning the respective interests of customers and contractors.

  12. Management of Software Development Projects

    Felician ALECU

    2011-04-01

    Full Text Available Any major software development starts with the Initiating process group. Once the charter document is approved, the Planning and then to the Executing stages will follow. Monitoring and Controlling is measuring the potential performance deviation of the project in terms of schedule and costs and performs the related Integrated Change Control activities. At the end, during the Closing, the program/project manager will check the entire work is completed and the objectives are met.

  13. Kashagan oil field development. Kazakhstan

    Urbaniak, D.; Gerebizza, E.; Wasse, G.; Kochladze, M.

    2007-12-01

    Based on our research and field investigations of the Kashagan oil field development and relevant infrastructure in the Atyrau and Mangistau regions of Kazakhstan (cities and vicinities of Aktau, Atash, Atyrau, Bautino, Bolashak, Karabatan and Koshanai) evidence has been collected that raises serious concerns about environmental, social and health effects of this oil field development - such as sulphur emissions and storage which may pose serious threats for the communities close to the Kashagan oil facilities and for the Caspian Sea environment. Furthermore, since becoming the single Operator of the North Caspian Sea Production Sharing Agreement (PSA), the Agip Kazakhstan North Caspian Operating Company N.V. (Agip KCO) has failed to release all information available on the environmental, health and social impacts of its operations in the Kashagan oil field. As requested by the local communities and required by Constitution of Kazakhstan Republic and Aarhus Convention on Access to Information, Public Participation in Decision-Making and Access to Justice in Environmental Matters ratified by Kazakhstan in 2001, such information must be made available. There is also a growing concern among the civil society that the European Commission through its officials is publicly expressing support to European oil companies' members of the Agip KCO despite their failure to fulfil basic environmental regulations. This continued support contradicts the European Union's fundamental values and frequent statements related to Human Rights and Sustainable Development. Thousands of people have already been relocated in the region because of sulphur emissions and other highly poisonous chemicals such as mercaptans, which are present at very high levels in Northern Caspian oil. Unprotected storage of large quantities of sulphur is also recognised as a major cause of acid rain on a global level. This Report implores Agip KCO to release all available and required information on the

  14. Overview of DOE Oil and Gas Field Laboratory Projects

    Bromhal, G.; Ciferno, J.; Covatch, G.; Folio, E.; Melchert, E.; Ogunsola, O.; Renk, J., III; Vagnetti, R.

    2017-12-01

    America's abundant unconventional oil and natural gas (UOG) resources are critical components of our nation's energy portfolio. These resources need to be prudently developed to derive maximum benefits. In spite of the long history of hydraulic fracturing, the optimal number of fracturing stages during multi-stage fracture stimulation in horizontal wells is not known. In addition, there is the dire need of a comprehensive understanding of ways to improve the recovery of shale gas with little or no impacts on the environment. Research that seeks to expand our view of effective and environmentally sustainable ways to develop our nation's oil and natural gas resources can be done in the laboratory or at a computer; but, some experiments must be performed in a field setting. The Department of Energy (DOE) Field Lab Observatory projects are designed to address those research questions that must be studied in the field. The Department of Energy (DOE) is developing a suite of "field laboratory" test sites to carry out collaborative research that will help find ways of improving the recovery of energy resources as much as possible, with as little environmental impact as possible, from "unconventional" formations, such as shale and other low permeability rock formations. Currently there are three field laboratories in various stages of development and operation. Work is on-going at two of the sites: The Hydraulic Fracturing Test Site (HFTS) in the Permian Basin and the Marcellus Shale Energy and Environmental Lab (MSEEL) project in the Marcellus Shale Play. Agreement on the third site, the Utica Shale Energy and Environmental Lab (USEEL) project in the Utica Shale Play, was just recently finalized. Other field site opportunities may be forthcoming. This presentation will give an overview of the three field laboratory projects.

  15. Managing MDO Software Development Projects

    Townsend, J. C.; Salas, A. O.

    2002-01-01

    Over the past decade, the NASA Langley Research Center developed a series of 'grand challenge' applications demonstrating the use of parallel and distributed computation and multidisciplinary design optimization. All but the last of these applications were focused on the high-speed civil transport vehicle; the final application focused on reusable launch vehicles. Teams of discipline experts developed these multidisciplinary applications by integrating legacy engineering analysis codes. As teams became larger and the application development became more complex with increasing levels of fidelity and numbers of disciplines, the need for applying software engineering practices became evident. This paper briefly introduces the application projects and then describes the approaches taken in project management and software engineering for each project; lessons learned are highlighted.

  16. Optimising Impact in Astronomy for Development Projects

    Grant, Eli

    2015-08-01

    Positive outcomes in the fields of science education and international development are notoriously difficult to achieve. Among the challenges facing projects that use astronomy to improve education and socio-economic development is how to optimise project design in order to achieve the greatest possible benefits. Over the past century, medical scientists along with statisticians and economists have progressed an increasingly sophisticated and scientific approach to designing, testing and improving social intervention and public health education strategies. This talk offers a brief review of the history and current state of `intervention science'. A similar framework is then proposed for astronomy outreach and education projects, with applied examples given of how existing evidence can be used to inform project design, predict and estimate cost-effectiveness, minimise the risk of unintended negative consequences and increase the likelihood of target outcomes being achieved.

  17. Results of the ITER toroidal field model coil project

    Salpietro, E.; Maix, R.

    2001-01-01

    In the scope of the ITER EDA one of the seven largest projects was devoted to the development, manufacture and testing of a Toroidal Field Model Coil (TFMC). The industry consortium AGAN manufactured the TFMC based on on a conceptual design developed by the ITER EDA EU Home Team. The TFMC was completed and assembled in the test facility TOSKA of the Forschungszentrum Karlsruhe in the first half of 2001. The first testing phase started in June 2001 and lasted till October 2001. The first results have shown that the main goals of the project have been achieved

  18. Report on the wind power development field test project in the off-shore park in Daitocho Town in fiscal 1997. System design; 1997 nendo Daitocho kaiyo koen nado ni okeru furyoku kaihatsu field test jigyo hokokusho. System sekkei

    NONE

    1997-12-01

    This paper reports the wind power development field test project in the off-shore park in Daitocho Town in Shizuoka Prefecture. The annual average wind velocity was 4.2 m/s (at height of 20 m above the ground), where the facility utilization rates for 300 and 500 kW class plants were 15.1 and 16.7%, respectively. Both of the annual average wind velocity and the facility utilization rate do not meet the criteria established by NEDO. Although the location is adjacent to the Natural Park, there is no restricting condition for installation. The substation to which system linkage is to be performed is the Daito substation 3 km north of the planned location. The major load is the Daito Spa in the park facility. Ground bed at depth of 5 m will be used as the windmill foundation supporting bed. There is little electromagnetic wave hazard. The location is 380 m away from the nearest residential house, presenting no windmill noise problem. The amount of power to be generated was assumed 281,000 kWh. Specifications for nine models of 300-kW class windmills that can be introduced into Japan were discussed to select a model. The project cost was calculated to be 128.5 million yen. The construction cost will be 428,000 yen and the power generation cost 38.1 yen/kWh. Its economy is poor when the current unit price for surplus power purchase is considered, but the effect of enlightenment may be expected. (NEDO)

  19. Institutional support for projects development

    Tobar, Carlos

    2000-01-01

    The paper describes the institutional support to develop projects on renewable energy, also describes the different ways to obtain financial support from the public sector and the interaction among private sector, universities and non governmental agencies in training, research and generation of energy

  20. Balbina's region sustainable development project

    Hargreaves, Paul

    1994-01-01

    This work presents a planning and administration of an environmental project proposal for Balbina's lake hydroelectric power station restoration. The socio-economic objectives are the hydro-forest bio production development which include fishery, specialized tourism, leisure, besides the processing of industrial raw materials

  1. Hualapai Tribal Utility Development Project

    Hualapai Tribal Nation

    2008-05-25

    The first phase of the Hualapai Tribal Utility Development Project (Project) studied the feasibility of establishing a tribally operated utility to provide electric service to tribal customers at Grand Canyon West (see objective 1 below). The project was successful in completing the analysis of the energy production from the solar power systems at Grand Canyon West and developing a financial model, based on rates to be charged to Grand Canyon West customers connected to the solar systems, that would provide sufficient revenue for a Tribal Utility Authority to operate and maintain those systems. The objective to establish a central power grid over which the TUA would have authority and responsibility had to be modified because the construction schedule of GCW facilities, specifically the new air terminal, did not match up with the construction schedule for the solar power system. Therefore, two distributed systems were constructed instead of one central system with a high voltage distribution network. The Hualapai Tribal Council has not taken the action necessary to establish the Tribal Utility Authority that could be responsible for the electric service at GCW. The creation of a Tribal Utility Authority (TUA) was the subject of the second objective of the project. The second phase of the project examined the feasibility and strategy for establishing a tribal utility to serve the remainder of the Hualapai Reservation and the feasibility of including wind energy from a tribal wind generator in the energy resource portfolio of the tribal utility (see objective 2 below). It is currently unknown when the Tribal Council will consider the implementation of the results of the study. Objective 1 - Develop the basic organizational structure and operational strategy for a tribally controlled utility to operate at the Tribe’s tourism enterprise district, Grand Canyon West. Coordinate the development of the Tribal Utility structure with the development of the Grand Canyon

  2. 75 FR 22674 - Moynihan Station Development Project

    2010-04-29

    ... DEPARTMENT OF TRANSPORTATION Federal Railroad Administration Moynihan Station Development Project... availability of and public comment period for the Moynihan Station Development Project Environmental Assessment... 22675

  3. Quality of educational services in the field of Project management

    Zlatko Barilović

    2013-12-01

    Full Text Available The growth and development of any business system depends on effectively and successfully implemented projects. Considering that the number of projects worldwide has been constantly increasing, developing project skills in individuals which will be involved in a project is of crucial importance. In the Republic of Croatia, the number of institutions offering education programmes in project management has been steadily growing. Each of these institutions will have to build its competitiveness on the marketing concept. Lately, the quality of educational services has been recognized as an increasingly important element of marketing. One of the education programmes in the field of project management in Croatia is the Specialist Graduate Professional Study Programme in Project Management offered at the Baltazar Adam Krčelić College of Business and Management in Zaprešić. In this paper the authors examine the competitiveness of the above education programme through a survey on the quality of educational service conducted in 2012 with a sample of 202 students with the aim of further defining the guidelines for improvement of its market competitiveness

  4. Experiences of project developers around CDM projects in South Africa

    Thurner, Thomas W.; Varughese, Arun

    2013-01-01

    Project developers in South Africa are puzzled with the long process of evaluating and registering their CDM projects. In addition to other obstacles, we find that South African big businesses are rather reluctant to engage in any new business activities such as CDM projects and municipalities often lack the necessary flexibility. This offers opportunities for small-scale project developers who spot the opportunities and find creative solutions to overcome these difficulties. - Highlights: • First paper analysing the experience of small project developers in South Africa. • Project developers in South Africa are puzzled with the long process. • South African big businesses are reluctant to engage in CDM projects. • Small-scale project developers spot opportunities and find creative solutions to overcome difficulties. • Also, we saw learning processes of South African administration in support of CDM projects

  5. Management of research and development project

    Go, Seok Hwa; Hong Jeong Yu; Hyun, Byeong Hwan

    2010-12-01

    This book introduces summary on management of research and development project, prepare of research and development with investigation and analysis of paper, patent and trend of technology, structure of project, management model, management of project, management of project range, management of project time, management of project cost, management of project goods, management of project manpower, management of communication, management of project risk, management of project supply, management of outcome of R and D, management of apply and enroll of patent and management of technology transfer.

  6. Modeling of Karachaganak field development

    Sadvakasov, A. A.; Shamsutdinova, G. F.; Almukhametova, E. M.; Gabdrakhmanov, N. Kh

    2018-05-01

    Management of a geological deposit includes the study and analysis of oil recovery, identification of factors influencing production performance and oil-bearing rock flooding, reserve recovery and other indicators characterizing field development in general. Regulation of oil deposits exploitation is a mere control over the fluid flow within a reservoir, which is ensured through the designed system of development via continuous improvement of production and injection wells placement, optimum performance modes, service conditions of downhole and surface oil-field equipment taking into account various changes and physical-geological properties of a field when using modern equipment to obtain the best performance indicators.

  7. Automotive Stirling Engine Development Project

    Ernst, William D.; Shaltens, Richard K.

    1997-01-01

    The development and verification of automotive Stirling engine (ASE) component and system technology is described as it evolved through two experimental engine designs: the Mod 1 and the Mod 2. Engine operation and performance and endurance test results for the Mod 1 are summarized. Mod 2 engine and component development progress is traced from the original design through hardware development, laboratory test, and vehicle installation. More than 21,000 hr of testing were accomplished, including 4800 hr with vehicles that were driven more dm 59,000 miles. Mod 2 engine dynamometer tests demonstrated that the engine system configuration had accomplished its performance goals for power (60 kW) and efficiency (38.5%) to within a few percent. Tests with the Mod 2 engine installed in a delivery van demonstrated combined metro-highway fuel economy improvements consistent with engine performance goals and the potential for low emission levels. A modified version of the Mod 2 has been identified as a manufacturable design for an ASE. As part of the ASE project, the Industry Test and Evaluation Program (ITEP), NASA Technology Utilization (TU) project, and the industry-funded Stirling Natural Gas Engine program were undertaken to transfer ASE technology to end users. The results of these technology transfer efforts are also summarized.

  8. Estimating software development project size, using probabilistic ...

    Estimating software development project size, using probabilistic techniques. ... of managing the size of software development projects by Purchasers (Clients) and Vendors (Development ... EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT

  9. SRS environmental technology development field test platform

    Riha, B.D.; Rossabi, J.; Eddy-Dilek, C.A.

    1995-01-01

    A critical and difficult step in the development and implementation of new technologies for environmental monitoring and characterization is successfully transferring these technologies to industry and government users for routine assessment and compliance activities. The Environmental Sciences Section of the DOE Savannah River Technology Center provides a forum for developers, potential users, and regulatory organizations to evaluate new technologies in comparison with baseline technologies in a well characterized field test bed. The principal objective of this project is to conduct comprehensive, objective field tests of monitoring and characterization technologies that are not currently used in EPA standard methods and evaluate their performance during actual operating conditions against baseline methods. This paper provides an overview of the field test site and a description of some of the technologies demonstrated at the site including their field applications

  10. Framework for Project Development in the Renewable Energy Sector

    Springer, R.

    2013-02-01

    The concepts, descriptions, diagrams, and acronyms developed and described herein are meant to provide a contextual framework as well as a systematic, repeatable process to assist a potential project sponsor in understanding and navigating early-stage project development. Professional project developers will recognize these concepts and hold them as intuitive and even obvious, though the fundamentals of this specialized field are rarely written down and defined as they are here.

  11. SPECIFICITY OF THE PROJECTIVE FIELD: REVERIES AND TRANSFORMATIVE POTENTIALITIES

    Tiziana Sola

    2014-01-01

    This article suggests a reading of the projectives Methods in Bionian key, with particular reference to the bionian elaboration by Antonino Ferro, who substantially considers the patient’s associative flows as forms of the oneiric. The projective situation also represents a place of induction to reverie, in resonance with the concept of projective field, the peculiarity of which lie in the introduction of the element “third”, i.e. the test material.Keywords: Projective methods - Projective fi...

  12. 23 CFR 660.112 - Project development.

    2010-04-01

    ... PROGRAMS (DIRECT FEDERAL) Forest Highways § 660.112 Project development. (a) Projects to be administered by... Program. Projects to be administered by a cooperator shall be developed in accordance with Federal-aid procedures and procedures documented in the statewide agreement. (b) The FH projects shall be designed in...

  13. SPECIFICITY OF THE PROJECTIVE FIELD: REVERIES AND TRANSFORMATIVE POTENTIALITIES

    Tiziana Sola

    2014-01-01

    Full Text Available This article suggests a reading of the projectives Methods in Bionian key, with particular reference to the bionian elaboration by Antonino Ferro, who substantially considers the patient’s associative flows as forms of the oneiric. The projective situation also represents a place of induction to reverie, in resonance with the concept of projective field, the peculiarity of which lie in the introduction of the element “third”, i.e. the test material.Keywords: Projective methods - Projective field – induction to reverie – activity of symbolization

  14. Testing Software Development Project Productivity Model

    Lipkin, Ilya

    Software development is an increasingly influential factor in today's business environment, and a major issue affecting software development is how an organization estimates projects. If the organization underestimates cost, schedule, and quality requirements, the end results will not meet customer needs. On the other hand, if the organization overestimates these criteria, resources that could have been used more profitably will be wasted. There is no accurate model or measure available that can guide an organization in a quest for software development, with existing estimation models often underestimating software development efforts as much as 500 to 600 percent. To address this issue, existing models usually are calibrated using local data with a small sample size, with resulting estimates not offering improved cost analysis. This study presents a conceptual model for accurately estimating software development, based on an extensive literature review and theoretical analysis based on Sociotechnical Systems (STS) theory. The conceptual model serves as a solution to bridge organizational and technological factors and is validated using an empirical dataset provided by the DoD. Practical implications of this study allow for practitioners to concentrate on specific constructs of interest that provide the best value for the least amount of time. This study outlines key contributing constructs that are unique for Software Size E-SLOC, Man-hours Spent, and Quality of the Product, those constructs having the largest contribution to project productivity. This study discusses customer characteristics and provides a framework for a simplified project analysis for source selection evaluation and audit task reviews for the customers and suppliers. Theoretical contributions of this study provide an initial theory-based hypothesized project productivity model that can be used as a generic overall model across several application domains such as IT, Command and Control

  15. Development of project financing in Russia

    Nikonova Irina Aleksandrovna

    2012-07-01

    Full Text Available The implementation of effective investment projects is essential to the modernization of the Russian economy and its transition to a high-tech way of development. The most complex and risky form of financing projects is project financing (Project Finance.

  16. Child-Robot Interaction in the Wild : Field Testing Activities of the ALIZ-E Project

    Greeff, J. de; Blanson Henkemans, O.A.; Fraaije, A.; Solms, L.; Wigdor, N.; Bierman, B.

    2014-01-01

    A field study was conducted in which CRI activities developed by the ALIZ-E project were tested with the project's primary user group: children with diabetes. This field study resulted in new insights in the modalities and roles a robot aimed at CRI in a healthcare setting might utilise, while in

  17. The JET Project Scientific and technical developments 1976

    1977-01-01

    The JET (Joint European Torus) Project is fully described in EUR 5516e (EUR-JET-R5) 'The JET Project - Design Proposal'. This report describes developments in the project from the stage described in EUR 5516e until late in 1976. An introductory chapter describes the present state of the project and subsequent chapters deal in detail with the following topics: experimental programme aspects; vacuum vessel, pumping system, activation studies; toroidal field coils and mechanical structure; poloidal field system; assembly and maintenance; power supplies; control and data acquisition system; site and buildings

  18. Quality Assurance Project Plan Development Tool

    This tool contains information designed to assist in developing a Quality Assurance (QA) Project Plan that meets EPA requirements for projects that involve surface or groundwater monitoring and/or the collection and analysis of water samples.

  19. Landfill Gas Energy Project Development Handbook

    View handbook that provides an overview of LFG energy project development guidance and presents the technological, economic and regulatory considerations that affect the feasibility and success of these projects.

  20. Gypsy Field Project in Reservoir Characterization

    John P. Castagna; William J. Lamb; Carlos Moreno; Roger Young; Lynn Soreghan

    2006-01-01

    The objective of the Gypsy Project was to properly calculate seismic attributes and integrate these into a reservoir characterization project. Significant progress was made on the project in four areas. (1) Attenuation: In order for seismic inversion for rock properties or calculation of seismic attributes used to estimate rock properties to be performed validly, it is necessary to deal with seismic data that has had true amplitude and frequency content restored to account for earth filtering effects that are generally not included in seismic reservoir characterization methodologies. This requires the accurate measurement of seismic attenuation, something that is rarely achieved in practice. It is hoped that such measurements may also provide additional independent seismic attributes for use in reservoir characterization studies. In 2000, we were concerned with the ground truthing of attenuation measurements in the vicinity of wells. Our approach to the problem is one of extracting as time varying wavelet and relating temporal variations in the wavelet to an attenuation model of the earth. This method has the advantage of correcting for temporal variations in the reflectivity spectrum of the earth which confound the spectral ratio methodology which is the most commonly applied means of measuring attenuation from surface seismic data. Part I of the report describes our efforts in seismic attenuation as applied to the Gypsy data. (2) Optimal Attributes: A bewildering array of seismic attributes is available to the reservoir geoscientist to try to establish correlations to rock properties. Ultimately, the use of such a large number of degrees of freedom in the search for correlations with limited well control leads to common misapplication of statistically insignificant results which yields invalid predictions. Cross-validation against unused wells can be used to recognize such problems, but does not offer a solution to the question of which attributes should be used

  1. Systems engineering real estate development projects

    Gusakova, Elena; Titarenko, Boris; Stepanov, Vitaliy

    2017-10-01

    In recent years, real estate development has accumulated a wealth of experience in implementing major projects, which requires comprehension and systematization. The scientific instrument of system engineering is studied in the article and is substantively interpreted with reference to real estate development projects. The most perspective approaches and models are substantiated, allowing strategically to plan the life cycle of the project as a whole, and also to solve the engineering butt problems of the project. The relevance of further scientific studies of regularities and specifics of the life cycle of real estate development projects conducted at the Moscow State University of Economics and Management at the ISTA department is shown.

  2. Field review of fish habitat improvement projects in central Idaho

    Beschta, R.L.; Griffith, J.; Wesche, T.A.

    1993-05-01

    The goal of this field review was to provide information to the Bonneville Power Administration (BPA) regarding previous and ongoing fish habitat improvement projects in central Idaho. On July 14, 1992, the review team met at the Sawtooth National Recreation Area office near Ketchum, Idaho, for a slide presentation illustrating several habitat projects during their construction phases. Following the slide presentation, the review team inspected fish habitat projects that have been implemented in the last several years in the Stanley Basin and adjacent valleys. At each site the habitat project was described to the field team and a brief period for project inspection followed. The review team visited approximately a dozen sites on the Challis, Sawtooth, and Boise National Forests over a period of approximately two and a half days. There are two objectives of this review namely to summarize observations for specific field sites and to provide overview commentary regarding the BPA habitat improvement program in central Idaho

  3. Valuing of research project in energy field with real options

    De Blasio, N.; Marzo, G.; Turatto, R.

    2008-01-01

    This article presents an application of real options theory for valuing a research project in the field of stranded gas valorisation. After a presentation of the theory, the analysis addresses the use of real options evaluation for generating alternative pathways in order to add new value to the R D projects. It also shows how real option approach may be important for selecting among competitive projects, but also for providing a system for valorisation of decision-maker flexibility [it

  4. Criteria for Developing a Successful Privatization Project

    1989-05-01

    conceptualization and planning are required when pursuing privatization projects. In fact, privatization project proponents need to know how to...selection of projects for analysis, methods of acquiring information about these projects, and the analysis framwork . Chapter IV includes the analysis. A...performed an analysis to determine cormion conceptual and creative approaches and lessons learned. This analysis was then used to develop criteria for

  5. Status of LMFBR development project in Japan

    Nagane, G.; Akebi, M.; Matsuno, Y.

    1987-01-01

    Initiation of the LMFBR development project in Japan was decided by the Atomic Energy Commission of Japan in 1966. In 1967, the Power Reactor and Nuclear Fuel Development Corporation (PNC) was established to realize the project as a part of its tasks of a wide scope covering all the reseatch and development activities concerning fuel cycle. In the present paper the status of experimental fast reactor (Joyo), which is the first milestone of the LMFBR project, prototype fast reactor (Monju) and R and D activities supporting the project including that for larger LMFBRs in the future is described. (author)

  6. From field studies to risk management: the Sensib project

    Mercat-Rommens, C.; Renaud, P.

    2004-01-01

    The consequences for the man and the environment of the discharges of nuclear facilities depend on the importance and the nature of the discharges, but also on the environment which receives them. Thus, the impact of a pollution, which is expressed in term of toxicity, risk or economic consequences, varies according to the characteristics of the environment and the use of this environment by the man. The radioecological sensitivity can be defined as the response of the environment to a radioactive pollution. This response is expressed through various indicators: the activity of a radionuclide at a precise moment, a stock of radionuclide in a given environmental compartment or a flux of radionuclide... For a determined discharge, the higher is the response, the more sensitive is the environment. If all the ecosystems appear sensitive, their sensitivity does not concern the same criteria and it is currently difficult to compare these criteria between them; is it more hazardous to have a stock of radioactivity present in a natural space or to have an important but time-limited concentration of radionuclides in a river used for irrigation? The idea of the SENSIB project is to create a standardized tool which makes it possible to represent and to compare with the same scale the sensitivity of various ecosystems. The sensitivity indexes, which will be developed during the project, aim to represent the intensity of the environmental response. These indicators, which are the result of the transfer of the radionuclides in the environment, depend on various intrinsic parameters of the ecosystems (climate, soil, agricultural practises...). The SENSIB project, based on results of field studies conducted by IRSN, aims to develop both a methodology to calculate sensitivity indexes and a radioecological sensitivity scale usable for risk management. (author)

  7. Project Development Specification for Valve Pit Manifold

    MCGREW, D.L.

    2000-01-01

    Establishes the performance, design development, and test requirements for the valve pit manifolds. The system engineering approach was used to develop this document in accordance with the guidelines laid out in the Systems Engineering Management Plan for Project W-314

  8. Project Development Specification for Special Protective Coating

    MCGREW, D.L.

    2000-01-01

    Establishes the performance, design development, and test requirements for the Special Protective Coating. The system engineering approach was used to develop this document in accordance with the guidelines laid out in the Systems Engineering Management Plan for Project W-314

  9. Development of the Decommissioning Project Management System, DECOMMIS

    Chung, U. S.; Park, J. H.; Lee, K. W.; Hwang, D. S.; Park, S. K.; Hwang, S. T.; Paik, S. T.; Choi, Y. D.; Chung, K. H.; Lee, K. I.; Hong, S. B.

    2007-03-01

    At the Korea Atomic Energy Research Institute(KAERI), two projects for decommissioning of the research reactors and uranium conversion plant are carried out. The management of the projects can be defined as 'the decision of the changes of the decommissioning methodologies for the more efficient achievement of the project at an adequate time and to an improved method'. The correct decision comes from the experiences on the decommissioning project and the systematic experiences can be obtained from the good management of the decommissioning information. For this, a project management tool, DECOMMIS, was developed in the D and D Technology Division, which has the charge of the decommissioning projects at the KAERI, and its purpose was extended to following fields; generation of reports on the dismantling waste for WACID, record keeping for the next decommissioning projects of nuclear facilities, provision of fundamental data for the R and D of the decommissioning technologies

  10. Development of the Decommissioning Project Management System, DECOMMIS

    Chung, U. S.; Park, J. H.; Lee, K. W.; Hwang, D. S.; Park, S. K.; Hwang, S. T.; Paik, S. T.; Choi, Y. D.; Chung, K. H.; Lee, K. I.; Hong, S. B

    2007-03-15

    At the Korea Atomic Energy Research Institute(KAERI), two projects for decommissioning of the research reactors and uranium conversion plant are carried out. The management of the projects can be defined as 'the decision of the changes of the decommissioning methodologies for the more efficient achievement of the project at an adequate time and to an improved method'. The correct decision comes from the experiences on the decommissioning project and the systematic experiences can be obtained from the good management of the decommissioning information. For this, a project management tool, DECOMMIS, was developed in the D and D Technology Division, which has the charge of the decommissioning projects at the KAERI, and its purpose was extended to following fields; generation of reports on the dismantling waste for WACID, record keeping for the next decommissioning projects of nuclear facilities, provision of fundamental data for the R and D of the decommissioning technologies.

  11. Analysis of projects development of enterprises in engineering industries in Khmelnytskyi region

    SHKODA M.S.

    2012-01-01

    This article analyzes the use of development projects in the engineering industry of Khmelnitsky region. The current state of engineering field. Solves warehouse development projects engineering enterprises and activities to enhance their implementation.

  12. Report on the state of research in the 5-dimensional projective unified field theory

    Schmutzer, Ernst

    2009-01-01

    The author presents a historical sketch of the projective relativity theory before and (with new qualitative arguments) after World War II. Then he treats the development of his Projective Unified Field Theory since 1957 up till now with applications to a closed cosmological model, with the result of a vanishing big bang and satisfying numerical cosmological parameters in good agreement with the experiments. (orig.)

  13. Leadership Development Program Final Project

    Parrish, Teresa C.

    2016-01-01

    TOSC is NASA's prime contractor tasked to successfully assemble, test, and launch the EM1 spacecraft. TOSC success is highly dependent on design products from the other NASA Programs manufacturing and delivering the flight hardware; Space Launch System(SLS) and Multi-Purpose Crew Vehicle(MPCV). Design products directly feed into TOSC's: Procedures, Personnel training, Hardware assembly, Software development, Integrated vehicle test and checkout, Launch. TOSC senior management recognized a significant schedule risk as these products are still being developed by the other two (2) programs; SVE and ACE positions were created.

  14. Development of NUCEF project hereafter

    Takeshita, Isao; Dojiri, Shigeru

    1994-01-01

    The construction of NUCEF was started in June, 1989, and it is completed in June, 1994. The hot test is prepared from the middle of this fiscal year, and static critical ficility(STACY)/transient critical facility(TRACY) are expected to attain the initial criticality within this fiscal year. The research plan for the time being was decided, and the conception and policy for the cooperation with outside and utilization are taking shape. In the STACY, low enriched uranium experiment is carried out for about three years, and thereafter, plutonium experiment is started. In the TRACY, the performance is confirmed by raising the test condition, and it is expected to obtain useful data. In the back-end key elements research facility(BECKY), after sufficient uranium experiment, the experiment using actual spent fuel and high level waste liquid is carried out. NUCEF is the facility for carrying out the basic research on the back end of nuclear fuel cycle. The promotion of the national and international cooperation in the research, the contribution to the fostering of capable men, and the method of cooperation with outside are explained. NUCEF has the role of leading the basic research on the safety and the technical advance in this field. (K.I.)

  15. Environmental Field Surveys, EMF Rapid Program, Engineering Project No.3

    Enertech Consultants

    1996-04-01

    The EMF Research and Public Information Dissemination Program (RAPID) includes several engineering research in the area of exposure assessment and source characterization. RAPID engineering project No. 3: ''Environmental Field Surveys'' was performed to obtain information on the levels and characteristics of different environments, for which only limited data were available, especially in comparison to magnetic field data for the residential environment and for electric utility facilities, such as power lines and substations. This project was also to provide information on the contribution of various field sources in the surveyed environments. Magnetic field surveys were performed at four sites for each of five environments: schools, hospitals, office buildings, machine shops, and grocery stores. Of the twenty sites surveyed, 11 were located in the San Francisco Bay Area and 9 in Massachusetts. The surveys used a protocol based on magnetic field measurements and observation of activity patterns, designed to provide estimates of magnetic field exposure by type of people and by type of sources. The magnetic field surveys conducted by this project produced a large amount of data which will form a part of the EMF measurement database Field and exposure data were obtained separately for ''area exposure'' and ''at exposure points''. An exposure point is a location where persons engage in fixed, site specific activities near a local source that creates a significant increase in the area field. The area field is produced by ''area sources'', whose location and field distribution is in general not related to the location of the people in the area.

  16. Baseline methodologies for clean development mechanism projects

    Lee, M.K. (ed.); Shrestha, R.M.; Sharma, S.; Timilsina, G.R.; Kumar, S.

    2005-11-15

    The Kyoto Protocol and the Clean Development Mechanism (CDM) came into force on 16th February 2005 with its ratification by Russia. The increasing momentum of this process is reflected in more than 100 projects having been submitted to the CDM Executive Board (CDM-EB) for approval of the baselines and monitoring methodologies, which is the first step in developing and implementing CDM projects. A CDM project should result in a net decrease of GHG emissions below any level that would have resulted from other activities implemented in the absence of that CDM project. The 'baseline' defines the GHG emissions of activities that would have been implemented in the absence of a CDM project. The baseline methodology is the process/algorithm for establishing that baseline. The baseline, along with the baseline methodology, are thus the most critical element of any CDM project towards meeting the important criteria of CDM, which are that a CDM should result in 'real, measurable, and long term benefits related to the mitigation of climate change'. This guidebook is produced within the frame work of the United Nations Environment Programme (UNEP) facilitated 'Capacity Development for the Clean Development Mechanism (CD4CDM)' Project. This document is published as part of the projects effort to develop guidebooks that cover important issues such as project finance, sustainability impacts, legal framework and institutional framework. These materials are aimed to help stakeholders better understand the CDM and are believed to eventually contribute to maximize the effect of the CDM in achieving the ultimate goal of UNFCCC and its Kyoto Protocol. This Guidebook should be read in conjunction with the information provided in the two other guidebooks entitled, 'Clean Development Mechanism: Introduction to the CDM' and 'CDM Information and Guidebook' developed under the CD4CDM project. (BA)

  17. Baseline methodologies for clean development mechanism projects

    Lee, M.K.; Shrestha, R.M.; Sharma, S.; Timilsina, G.R.; Kumar, S.

    2005-11-01

    The Kyoto Protocol and the Clean Development Mechanism (CDM) came into force on 16th February 2005 with its ratification by Russia. The increasing momentum of this process is reflected in more than 100 projects having been submitted to the CDM Executive Board (CDM-EB) for approval of the baselines and monitoring methodologies, which is the first step in developing and implementing CDM projects. A CDM project should result in a net decrease of GHG emissions below any level that would have resulted from other activities implemented in the absence of that CDM project. The 'baseline' defines the GHG emissions of activities that would have been implemented in the absence of a CDM project. The baseline methodology is the process/algorithm for establishing that baseline. The baseline, along with the baseline methodology, are thus the most critical element of any CDM project towards meeting the important criteria of CDM, which are that a CDM should result in 'real, measurable, and long term benefits related to the mitigation of climate change'. This guidebook is produced within the frame work of the United Nations Environment Programme (UNEP) facilitated 'Capacity Development for the Clean Development Mechanism (CD4CDM)' Project. This document is published as part of the projects effort to develop guidebooks that cover important issues such as project finance, sustainability impacts, legal framework and institutional framework. These materials are aimed to help stakeholders better understand the CDM and are believed to eventually contribute to maximize the effect of the CDM in achieving the ultimate goal of UNFCCC and its Kyoto Protocol. This Guidebook should be read in conjunction with the information provided in the two other guidebooks entitled, 'Clean Development Mechanism: Introduction to the CDM' and 'CDM Information and Guidebook' developed under the CD4CDM project. (BA)

  18. Field to fuel: developing sustainable biorefineries.

    Jenkins, Robin; Alles, Carina

    2011-06-01

    Life-cycle assessment (LCA) can be used as a scientific decision support technique to quantify the environmental implications of various biorefinery process, feedstock, and integration options. The goal of DuPont's integrated corn biorefinery (ICBR) project, a cost-share project with the United States Department of Energy, was to demonstrate the feasibility of a cellulosic ethanol biorefinery concept. DuPont used LCA to guide research and development to the most sustainable cellulosic ethanol biorefinery design in its ICBR project and will continue to apply LCA in support of its ongoing effort with joint venture partners. Cellulosic ethanol is a biofuel which has the potential to provide a sustainable solution to the nation's growing concerns around energy supply and climate change. A successful biorefinery begins with sustainable removal of biomass from the field. Michigan State University (MSU) used LCA to estimate the environmental performance of corn grain, corn stover, and the corn cob portion of the stover, grown under various farming practices for several corn growing locations in the United States Corn Belt. In order to benchmark the future technology options for producing cellulosic ethanol with existing technologies, LCA results for fossil energy consumption and greenhouse gas (GHG) emissions are compared to alternative ethanol processes and conventional gasoline. Preliminary results show that the DuPont ICBR outperforms gasoline and other ethanol technologies in the life-cycle impact categories considered here.

  19. Watershed manipulation project: Field implementation plan for 1990-1992

    Erickson, H.; Narahara, A.M.; Rustad, L.E.; Mitchell, M.; Lee, J.

    1993-02-01

    The Bear Brook Watershed in Maine (BBWM) was established in 1986 at Lead Mountain, Maine as part of the Environmental Protection Agency's (EPA) Watershed Manipulation Project (WPM). The goals of the project are to: (1) assess the chemical response of a small upland forested watershed to increased loadings of SO4, (2) determine interactions among biogeochemical mechanisms controlling watershed response to acidic deposition, and (3) test the assumptions of the Direct/Delayed Response Programs (DDRP) computer models of watershed acidification. The document summarizes the field procedures used in the establishment and initial implementation of the plot- and catchment- scale activities at the BBWM, and outlines plans for 1990-02 project activities

  20. Are Project Developers Knights and Researchers Queens?

    Vinstrup, Anya Bjørn

    2014-01-01

    How do project developers at universities view their customers – the researchers, and how do they see themselves as a profession? Does this view influence their motivation and what challenges does it impose? Taking elements of theory from Public Service Motivation (PSM) and linking it with a small...... empirically based survey among the project developers at a centrally located office at a university in Denmark – these questions are sought to be answered. The focal point being the motivation of the project developer, with special emphasis on their user perception, and the practical implications it has...... for leadership and organisational structures....

  1. Photovoltaic concentrator technology development project. Sixth project integration meeting

    None

    1980-10-01

    Thirty-three abstracts and short papers are presented which describe the current status of research, development, and demonstration of concentrator solar cell technology. Solar concentrators discussed include the parabolic trough, linear focus Fresnel lens, point focus Fresnel lens, and the parabolic dish. Solar cells studied include silicon, GaAs, and AlGaAs. Research on multiple junction cells, combined photovoltaic/thermal collectors, back contact solar cells, and beam splitter modules is described. Concentrator solar cell demonstration programs are reported. Contractor status summaries are given for 33 US DOE concentrator solar cell contracts; a description of the project, project status, and key results to date is included. (WHK)

  2. Factors that enable and hinder the implementation of projects in the alcohol and other drug field.

    MacLean, Sarah; Berends, Lynda; Hunter, Barbara; Roberts, Bridget; Mugavin, Janette

    2012-02-01

    Few studies systematically explore elements of successful project implementation across a range of alcohol and other drug (AOD) activities. This paper provides an evidence base to inform project implementation in the AOD field. We accessed records for 127 completed projects funded by the Alcohol, Education and Rehabilitation Foundation from 2002 to 2008. An adapted realist synthesis methodology enabled us to develop categories of enablers and barriers to successful project implementation, and to identify factors statistically associated with successful project implementation, defined as meeting all funding objectives. Thematic analysis of eight case study projects allowed detailed exploration of findings. Nine enabler and 10 barrier categories were identified. Those most frequently reported as both barriers and enablers concerned partnerships with external agencies and communities, staffing and project design. Achieving supportive relationships with partner agencies and communities, employing skilled staff and implementing consumer or participant input mechanisms were statistically associated with successful project implementation. The framework described here will support development of evidence-based project funding guidelines and project performance indicators. The study provides evidence that investing project hours and resources to develop robust relationships with project partners and communities, implementing mechanisms for consumer or participant input and attracting skilled staff are legitimate and important activities, not just in themselves but because they potentially influence achievement of project funding objectives. © 2012 The Authors. ANZJPH © 2012 Public Health Association of Australia.

  3. The Financing of Media Projects for Development.

    Spain, Peter L.

    1978-01-01

    Discusses the financing of Third World media projects that are designed for development, and reports on five main sources of funding--government sources, international agencies, advertising sales, private local support, and self-support. (Author/JEG)

  4. Itataia project - Development of the process

    Coelho, S.V.

    1987-01-01

    A process for treating the phosphorus uraniferous ore, from Itataia-CE mine in Brazil, was developed, establishing the basic flow chart for recovery two products: uranium concentrate and phosphoric acid. The developed process consists in physical concentration, chemical separation, solvent extraction, and it presented, in laboratory and pilot scales, recovery levels which assure the project viability technicaly and economicaly. The consolidation of project and the description of installations are presented by a documentary film. (M.C.K.) [pt

  5. Itataia project - Development of the process

    Coelho, S.V.

    1987-01-01

    A process for treating the phosphorous uraniferous ore, from Itataia-CE mine in Brazil, was developed, establishing the basic flow chart for recovery two products: uranium concentrate and phosphoric acid. The developed process consists in physical concentration, chemical separation, solvent extraction, and it presented, in laboratory and pilot scales, recovery leves which assure the project viability technically and economically. The consolidation of project and the description of installations are presented by a documentary film. (M.C.K.) [pt

  6. Product development projects dynamics and emergent complexity

    Schlick, Christopher

    2016-01-01

    This book primarily explores two topics: the representation of simultaneous, cooperative work processes in product development projects with the help of statistical models, and the assessment of their emergent complexity using a metric from theoretical physics (Effective Measure Complexity, EMC). It is intended to promote more effective management of development projects by shifting the focus from the structural complexity of the product being developed to the dynamic complexity of the development processes involved. The book is divided into four main parts, the first of which provides an introduction to vector autoregression models, periodic vector autoregression models and linear dynamical systems for modeling cooperative work in product development projects. The second part presents theoretical approaches for assessing complexity in the product development environment, while the third highlights and explains closed-form solutions for the complexity metric EMC for vector autoregression models and linear dyn...

  7. Oil field rejuvenation work starts at 14 project sites

    Petzet, G.A.

    1992-01-01

    This paper reports that the U.S. Department of Energy and oil and gas companies have released more information about a joint effort to rejuvenate aging U.S. oil fields in danger of abandonment. Work is starting on 14 demonstration projects that could recover 21 million bbl of oil from the fluvial dominated deltaic (FDD) reservoirs in which they are conducted. Wider application of the same techniques, if they are successful, could results in addition of 6.3 billion bbl of reserves, nearly 25% of U.S. crude oil reserves. A multidisciplinary team approach is to be used, with as many as 11 operators, service companies, universities, or state agencies participating in each project. All of the projects will culminate in extensive technology transfer activities. Here are descriptions of the projects gleaned from public abstracts provided by the DOE contractors

  8. Wind power development field test project at Aoyama Heights, Aoyama-cho. Detailed wind characteristics survey; Aoyamacho Aoyama Kogen ni okeru furyoku kaihatsu field test jigyo (fukyo seisa) hokokusho

    NONE

    1999-11-01

    A detailed wind characteristics survey was conducted at Aoyama Heights, Aoyama-cho, Naga-gun, Mie Prefecture, on the assumption that a wind power generation system would be constructed. The survey was a 1-year project from October 1998 through September 1999, and wind characteristics such as the average wind speed, average wind direction, standard deviation of wind velocity, and the maximum instantaneous wind speed were observed. The observation point was fixed at 20m above ground, the minimum time unit for observation was 10 minutes, and the 10-minute average value was defined as the measured value. For the maximum instantaneous wind speed, the minimum time unit for observation was set to be 2 seconds. The yearly average wind speed was 5.3m/s and the maximum wind speed in the period was 32m/s. Winds came prevalently from WNW (31.6%), and then from NW (16.8%), ESE (20.9%), and E (9.9%). The wind axis was in the direction of WNW-ESE, and the total wind direction occurrence rate was 89.0%. Turbulence intensity was 0.25 at wind speed 2.0m/s or more and 0.23 at wind speed 4.0m/s or more. Estimated wind turbine yearly operating factors of 70-84% were obtained using rated values of a 150kW, 300kW, and 750kW-class wind turbines. (NEDO)

  9. Leadership and Project Success in Development Sector

    Saghir Ahmed

    2017-10-01

    Full Text Available Aim/purpose - The study aims to investigate the relationship among the leadership, operational efficiency and project success in general and the impact of transformational leadership and operational efficiency on project success in particular. Design/methodology/approach - Mean comparison from descriptive statistics and multiple linear regression from inferential statistics was used to determine the association between variables and further impact of the transformational leadership and operational efficiency on project success in the development sector. The paper presents the results of a survey conducted among 200 employees from the top, middle & lower management levels of various national & international development organizations working in Pakistan like Microfinance Banks and other Rural Support Programs. Statistical Package for Social Sciences (SPSS was used to process data. Findings - The result shows positive association among transformational leadership, operational efficiency and project success. In addition, it was found that transformational leadership and operational efficiency have a positive and statistically significant impact on the project success. It is concluded that both transformational leadership and operational efficiency are vital to achieving the optimum level of success in any project, especially in the development sector. Research implications/limitations - The integral limitation of the study was the respondents because most of the development organizations have their operations in rural areas where access was difficult because of limited time and resources. In addition, such organizations are always reluctant to provide survey feedback. Originality/value/contribution - The paper contribution is in the theoretical and practical knowledge of the project success factors in the development sector which is still a somehow unexplored area. Regulators of the development sector may be benefited from this study.

  10. Generation project development opportunities in Latin America

    Carter, R.W.

    1993-01-01

    This presentation addresses the pitfalls and benefits of developing power generation projects in Latin America. The topics of the presentation include the countries where there is opportunity for development, the opportunities that exist in these countries, the influence of geographic proximity, and competition from the Far East and the European Community

  11. Clean development mechanism projects and portfolio risks

    Matsuhashi, Ryuji; Fujisawa, Sei; Mitamura, Wataru; Momobayashi, Yutaka; Yoshida, Yoshikuni

    2004-01-01

    Clean development mechanism (CDM) is expected to facilitate technology transfer from developed to developing countries as well as to economically reduce greenhouse gas emissions. In this article, we explore effective institutions to activate CDM projects. For this purpose, we have estimated internal rate of return (IRR) and other indicators on profitability for 42 CDM or JI projects, taking account of volatilities in the price of certified emission reductions (CER). As a result of Monte Carlo simulations, expected values and standard deviations in the IRR of the projects were quantitatively shown. Then we evaluated various risks in CDM, concluding that diversification of investment is an effective way to suppress these risks. Therefore securitization of CDM finance is proposed as a means of facilitating the diversification of investment. Namely, we present the concept of a CDM bond, which is a project bond with CER. We also investigated the role of governments to suppress risks in CDM. Referring to CERUPT, initiated by the Netherlands' government, the institution of 'insured CERUPT' is proposed to suppress downside risks in the IRR of the projects. We concluded that it is possible to make CDM projects viable by the 'insured CERUPT' and CDM bond

  12. Development and implementation of the Qatargas project

    Abdulrahman, A.

    1997-01-01

    Qatar Liquefied Gas Company Ltd. (QATAR GAS) was established in 1984 by an Emiri decree to build, own and operate a 6 million tonne per annum, LNG plant in Qatar using North Field gas as feedstock, and to export the products. At the time, the joint venture partners with Qatar Petroleum Corporation were TOTAL and British Petroleum (BP). QATAR GAS is responsible for the implementation and operation of the upstream project.(Author). 2 figs

  13. Development and implementation of the Qatargas project

    Abdulrahman, A [Qatar Liquefied Gas Company Ltd., Doha (Qatar)

    1997-06-01

    Qatar Liquefied Gas Company Ltd. (QATAR GAS) was established in 1984 by an Emiri decree to build, own and operate a 6 million tonne per annum, LNG plant in Qatar using North Field gas as feedstock, and to export the products. At the time, the joint venture partners with Qatar Petroleum Corporation were TOTAL and British Petroleum (BP). QATAR GAS is responsible for the implementation and operation of the upstream project.(Author). 2 figs.

  14. Integrating Field-Centered, Project Based Activities with Academic Year Coursework: A Curriculum Wide Approach

    Kelso, P. R.; Brown, L. M.

    2015-12-01

    Based upon constructivist principles and the recognition that many students are motivated by hands-on activities and field experiences, we designed a new undergraduate curriculum at Lake Superior State University. One of our major goals was to develop stand-alone field projects in most of the academic year courses. Examples of courses impacted include structural geology, geophysics, and geotectonics, Students learn geophysical concepts in the context of near surface field-based geophysical studies while students in structural geology learn about structural processes through outcrop study of fractures, folds and faults. In geotectonics students learn about collisional and rifting processes through on-site field studies of specific geologic provinces. Another goal was to integrate data and samples collected by students in our sophomore level introductory field course along with stand-alone field projects in our clastic systems and sequence stratigraphy courses. Our emphasis on active learning helps students develop a meaningful geoscience knowledge base and complex reasoning skills in authentic contexts. We simulate the activities of practicing geoscientists by engaging students in all aspects of a project, for example: field-oriented project planning and design; acquiring, analyzing, and interpreting data; incorporating supplemental material and background data; and preparing oral and written project reports. We find through anecdotal evidence including student comments and personal observation that the projects stimulate interest, provide motivation for learning new concepts, integrate skill and concept acquisition vertically through the curriculum, apply concepts from multiple geoscience subdisiplines, and develop soft skills such as team work, problem solving, critical thinking and communication skills. Through this projected-centered Lake Superior State University geology curriculum students practice our motto of "learn geology by doing geology."

  15. MODEL OF INTEGRATED VALUE OF PROJECTS IN THE FIELD OF ALTERNATIVE ENERGY

    Наталія Ігорівна БОРИСОВА

    2015-05-01

    Full Text Available Development of alternative energy sources requires the implementation of complex problems, the solution of which is necessary to apply the project approach. The uniqueness of alternative energy projects (AEP necessitates individual approach to evaluating the effectiveness of each. The paper contains the results of the project management features's analysis in the field of alternative energy, determining the values and developing of the value management integrated conceptual model of AEP. In assessing the effectiveness of AEP considered the socio-economic and commercial aspects. Value management integrated conceptual model of AEP was obtained by combining the classical model of the project management goals with the project values model "Five "E" and two "A". The classical model of the project management goals have been complemented with risk parameters.

  16. Brokerage by a Project Manager across a New Product Development Project

    Jepsen, Lisbeth Brøde; Jepsen, Anna Lund; Dietrich, Perttu

    2012-01-01

    between three subtypes of brokerage: Brokerage connecting actors from the project team with actors from the various departments within the same organization (intra-organizational brokerage), brokerage connecting employees at the NPD organization with someone working in another organization (inter...... as a hub between possible suppliers for the project. We had also expected that the PM would be more involved in coordination of, to and from the project team than what we found in this study. Based on the study, it seems that some of the connections that we, based on existing knowledge, would expect...... that the management of the project in terms of linking the stakeholders takes off in the solution development phase rather than in the concept development phase which is the phase in focus in large parts of the research that has taken place in this field. Further, contrary to expectations based on existing knowledge...

  17. Nordic projects in the field of nuclear safety

    Soerensen, H.C.

    1988-05-01

    This report deseribes the work in 1987 within the Nordic program concerning nuclear safety 1985-1989. The report has the form of a handbook meant for those in Scandinavia who are involved in nuclear safety, and it is based on statements from the constituent subject fields of the program. The first chapter is a short summary of the work and results over the year. In the next chapter an account is given of the ongoing projects within each of the subject fields. An economic survey of the entire program and a list of the reports and articles published in 1987 is included in the publication as well. Chapter 5 is a complete list of adresses comprising participants, project managers, program coordinators and members of the advisory group. (SH) 74 refs

  18. Nordic projects in the field of nuclear safety

    Soerensen, H.C.

    1989-07-01

    This report describes the work in 1988 within the Nordic program concerning nuclear safety 1985-1989. The report has the form of a handbook meant for those in Scandinavia who are involeved in nuclear safety, and it is based on statements from the constituent subject fields of the program. The first chapter is a short summary of the work and results over the year. In the next chapter an account is given of the ongoing projects within each of the subject fields. An economic survey of the entire program and a list of the reports and articles published in 1988 is included in the publicaltion as well. Chapter 5 is a complete list of adresses comprising participants, project managers, program coordinators and members of the advirosy group. (SH)

  19. Fields of dreams[Oil field development in the Gulf of Mexico

    DeLuca, Marshall

    2001-04-01

    The steady increase in deepwater development projects in the US Gulf of Mexico is discussed, and individual field descriptions are given with details of the development, the water depth, onstream date, and location for the Typhoon (Chevron), Prince (El Paso), Brutus (Shell), Nansen/Boomvang (Kerr-McGee), Canyon Express (TotalFinaElf), Medusa (Murphy), Horn Mountain (BP), NaKika (Shell), Crazy Horse (BP), Serrano/Oregano (Shell), and Crosby (Shell) projects. Information on the production, reserves, water depths and locations of >100 projects in the area are tabulated.

  20. Oil and gas field development: an NOC perspective

    Kronman, George [Halliburton Energy Services (United States). Landmark Division

    2004-07-01

    Every day, oil companies around the world face real-life field development and management problems like the ones described above. Making timely and well-informed field development decisions are among the most important decisions the management of any oil company can make. The field development phase of the oil and gas life cycle extends from the discovery of a hydrocarbon deposit through initial production. It also includes revitalization of mature and marginal fields. Field development projects require the greatest level of cross-disciplinary integration and the largest investment decisions in the entire oil field life cycle. The ultimate economic success or failure of most fields is set by the quality of decisions made during field development. Oil companies take many different approaches to field development based on unique business drivers, their asset portfolio mix and risk tolerance, access to data and experienced manpower, adoption of technology, availability of capital, ownership, management style and so on. This paper focuses on understanding and addressing the particular field development challenges facing NOCs today. (author)

  1. Project finance and international energy development

    Pollio, G.

    1998-01-01

    This paper explores the preference for and the features unique to project finance, one of the favoured vehicles for funding energy development. Our main focus is on the interests of project sponsors, commercial banks and host governments. Inclusion of the latter reflects the fact host governments are often leading participants in primary energy and energy-related projects; more recently, they have come to use limited recourse structures to finance local infrastructure development. Traditional analyses, whilst providing useful insights into the interests of leading project participants, are incapable of isolation a single motive or set of motives that can comprehensively account for all of the features common to this form of debt. Within an options-theoretic framework, most of these ambiguities are resolved. Risk management, long recognised as one of the primary reasons for choosing project finance over rival debt structures, is affirmed as a key explanatory factor. One the other hand, options pricing theory provides a radically different perspective on how to project finance contributes to the realisation of these objectives. (author)

  2. Development of Direct-Use Projects: Preprint

    Lund, J.

    2011-01-01

    A geothermal direct-use project utilizes a natural resource, a flow of geothermal fluid at elevated temperatures, which is capable of providing heat and/or cooling to buildings, greenhouses, aquaculture ponds, and industrial processes. Geothermal utilization requires matching the varied needs of the user and characteristics of the resource in order to development a successful project. Each application is unique; guidelines are provided for the logical steps required to implement a project. Recommended temperature and flows are suggested for spas and pools, space and district heating, greenhouse and aquaculture pond heating, and industrial applications. Guidelines are provided for selecting the necessary equipment for successfully implementing a direct-use project, including downhole pumps, piping, heat exchangers, and heat convectors. Additionally, the relationship between temperature, flow rate, and the use of heat exchangers to provide heat to a space with hot water or hot air is provided for a number of applications, with suggested 'rules of thumb'.

  3. Developing Project Duration Models in Software Engineering

    Pierre Bourque; Serge Oligny; Alain Abran; Bertrand Fournier

    2007-01-01

    Based on the empirical analysis of data contained in the International Software Benchmarking Standards Group(ISBSG) repository, this paper presents software engineering project duration models based on project effort. Duration models are built for the entire dataset and for subsets of projects developed for personal computer, mid-range and mainframeplatforms. Duration models are also constructed for projects requiring fewer than 400 person-hours of effort and for projectsre quiring more than 400 person-hours of effort. The usefulness of adding the maximum number of assigned resources as asecond independent variable to explain duration is also analyzed. The opportunity to build duration models directly fromproject functional size in function points is investigated as well.

  4. Report on field test project for wind power development at Onejime Athletic Park. Detailed wind characteristics survey; Onejime Undo Koen ni okeru furyoku kaihatsu field test jigyo (fukyo seisa) hokokusho

    NONE

    1999-11-01

    A detailed wind characteristics survey was conducted to study the feasibility of a wind power generation system for Onejime Athletic Park, Kimotsugu-gun, Kagoshima Prefecture. Observation instruments were installed at a wasteland beside the park and, in the period October 1, 1998, through September 30, 1999, data were collected at a point 20m above ground, such as the average wind speed and direction, wind velocity standard deviation, and the maximum instantaneous wind velocity. The data were analyzed, and findings were obtained, as mentioned below. The wind axis along which the wind direction occurrence rate was the highest ran WNW-ESE at an occurrence rate of 65.8%. Turbulence intensity was 0.23 at wind speeds of 2m/s and more, the maximum instantaneous wind velocity was 40m/s, all these fully satisfying the evaluation levels set forth by NEDO (New Energy and Industrial Technology Development Organization). On the other hand, the average wind speed was 3.48m/s and wind energy density was 69W/m{sup 2}, these failing to satisfy the levels indicated by NEDO. Studies were made on the assumption that 150, 300, and 750kW-class wind turbines would be introduced, and then it was found that their annual operating factors and facility availability rates both failed to meet the NEDO standards concerned and that therefore the site in question was not fit for wind power generation. (NEDO)

  5. A novel background field removal method for MRI using projection onto dipole fields (PDF).

    Liu, Tian; Khalidov, Ildar; de Rochefort, Ludovic; Spincemaille, Pascal; Liu, Jing; Tsiouris, A John; Wang, Yi

    2011-11-01

    For optimal image quality in susceptibility-weighted imaging and accurate quantification of susceptibility, it is necessary to isolate the local field generated by local magnetic sources (such as iron) from the background field that arises from imperfect shimming and variations in magnetic susceptibility of surrounding tissues (including air). Previous background removal techniques have limited effectiveness depending on the accuracy of model assumptions or information input. In this article, we report an observation that the magnetic field for a dipole outside a given region of interest (ROI) is approximately orthogonal to the magnetic field of a dipole inside the ROI. Accordingly, we propose a nonparametric background field removal technique based on projection onto dipole fields (PDF). In this PDF technique, the background field inside an ROI is decomposed into a field originating from dipoles outside the ROI using the projection theorem in Hilbert space. This novel PDF background removal technique was validated on a numerical simulation and a phantom experiment and was applied in human brain imaging, demonstrating substantial improvement in background field removal compared with the commonly used high-pass filtering method. Copyright © 2011 John Wiley & Sons, Ltd.

  6. Developments in superstring field theory

    Green, M.B.

    1987-01-01

    In this article the structure of superstring theories is outlined. The one-loop quantum superstring gauge anomalies are then described and it is shown that their absence leads to an interesting theory with gauge group SO(32). The one-loop infinities also cancel for this gauge group. The anomaly cancellation can be understood in terms of the low-energy effective supergravity-Yang-Mills field theory, from which it is shown that E 8 x E 8 is an equally good gauge group, which suggests that there should also be an interesting E 8 x E 8 superstring theory. A new type of superstring theory, known as the 'heterotic' string theory, which only describes strings with gauge groups E 8 x E 8 or SO(32) is described. Finally some very exciting prospects for obtaining a sensible description of four-dimensional physics from a ten-dimensional superstring theory with gauge group E 8 x E 8 is outlined. (author)

  7. New developments in Generator Services project

    Karneyeu, A; Kirsanov, M; Konstantinov, D; Ryabov, A; Zenin, O; Pokorski, W; Ribon, A

    2011-01-01

    The LOG Generator Services project provides validated, LOG compliant Monte Carlo generators code for both the theoretical and experimental communities at the LHC. In this paper we present the recent developments and the future plans of the project. We report on the current status of the generators repository, the new Autotools-based build system, as well as the new installation tools to create mirrors of the repository. We discuss new developments in testing and physics validation procedures in particular the use of HepMC Analysis Tool, as well as the Rivet validation tool. We also present a new activity, enlarging the scope of the Generator Services project, it is the involvement in the tuning of the Monte Carlo generators. This work, being essential for the understanding of the future LHC data, is now starting with the involvement of all the LHC experiments.

  8. Double beta decay: recent developments and projections

    Avignone, F.T. III; Brodzinski, R.L.; Brown, D.P.; Evans, J.C. Jr.; Hensley, W.K.; Reeves, J.H.; Wogman, N.A.

    1983-08-01

    A report of recent events in both theoretical and experimental aspects of double beta decay is given. General theoretical considerations, recent developments in nuclear structure theory, geochronological determinations of half lives and ratios as well as laboratory experiments are discussed with emphasis on the past three years. Some projections are given. 28 references

  9. Renewable Energy Project Development Assistance (Fact Sheet)

    2013-07-01

    This fact sheet provides information on the Tribes selected to receive assistance from the U.S. Department of Energy Office of Indian Energy 2013 Strategic Technical Assistance Response Team (START) Program, which provides technical expertise to support the development of next-generation energy projects on tribal lands.

  10. Implementing change: lessons from five development projects

    Riis, J. O.; Hildebrandt, S.; Andreasen, Mogens Myrup

    2001-01-01

    The aim of this paper is firstly to report on what we have observed by following major improvement and development projects in five industrial enterprises. In particular, the authors shall focus on issues which have often been addressed in Danish enterprises, namely the participation of employees...... with organizational changes. Thirdly, four paradoxes for managing development projects are presented; they may serve as guidelines for coping with the complexity and uncertainty of change processes......The aim of this paper is firstly to report on what we have observed by following major improvement and development projects in five industrial enterprises. In particular, the authors shall focus on issues which have often been addressed in Danish enterprises, namely the participation of employees...... in the change process, the role of a vision of the future company; and organizational learning processes taking place during the development project. Secondly, different interpretation models will be employed in an effort to broaden the understanding of the many facets and viewpoints associated...

  11. Future development of project management competences.

    Silvius, A.J.G.; Batenburg, R.

    2009-01-01

    This paper describes a study into the expected development of the competences of the project manager in the year 2027. The study was performed amongst the members of IPMA-Netherlands during the summer of 2007. In the study the 46 competences of the International Competence Baseline 3 (ICB 3) were

  12. Workforce development and effective evaluation of projects.

    Dickerson, Claire; Green, Tess; Blass, Eddie

    The success of a project or programme is typically determined in relation to outputs. However, there is a commitment among UK public services to spending public funds efficiently and on activities that provide the greatest benefit to society. Skills for Health recognised the need for a tool to manage the complex process of evaluating project benefits. An integrated evaluation framework was developed to help practitioners identify, describe, measure and evaluate the benefits of workforce development projects. Practitioners tested the framework on projects within three NHS trusts and provided valuable feedback to support its development. The prospective approach taken to identify benefits and collect baseline data to support evaluation was positively received and the clarity and completeness of the framework, as well as the relevance of the questions, were commended. Users reported that the framework was difficult to complete; an online version could be developed, which might help to improve usability. Effective implementation of this approach will depend on the quality and usability of the framework, the willingness of organisations to implement it, and the presence or establishment of an effective change management culture.

  13. Constraints To Effective Community Development Projects Among ...

    The study focused on the perceived constraints to effective community development projects among rural households in Calabar agricultural zone of Cross River State, Nigeria. Data were collected with the aid of structured questionnaire from 104 randomly selected respondents in the study area. Data analysis was by the ...

  14. Developing Critical Thinking through Student Consulting Projects

    Canziani, Bonnie; Tullar, William L.

    2017-01-01

    The authors present survey results from faculty at 44 universities on the role of student consulting projects in developing business students' critical thinking. They conclude that students can improve critical thinking by engaging in guided primary and secondary research to inform their business assumptions that underpin business planning and…

  15. Minerals and energy: major development projects - April 2006 listing

    William Mollard [Australian Bureau of Agricultural and Resource Economics (ABARE), Canberra, ACT (Australia)

    2006-06-15

    ABARE's project list, released around May and November each year, lists completed and committed projects in the minerals and energy sector in Australia. Santos' $200 million Casino gas field project in Bass Strait will produce natural gas and condensate while output from Berwyndale South will be coal seam methane. Five coal projects were completed in the six months to April 2006. The largest of these was Xstrata's Newlands Northern underground mine. In the same region, BMA's (BHP Billiton Mitsubishi Alliance) $102 million Broadmeadow underground mine and BHP/Mitsui Coal's $50 million Poitrel opencut mine, both near Moranbah, were brought into production. In New South Wales, two projects a new mine and a mine infrastructure development, both near Singletonwere commissioned. Xstrata's new Ravensworth West opencut mine will produce up to 1.5 million tonnes a year of thermal coal. Excel Coal's $73 million Wambo Rail project involved building a rail loop and loading facilities at its Wambo operation. Queensland coal mine projects and coal infrastructure developments account for 19 per cent (or $6.3 billion) of the estimated capital cost of $34 billion for all advanced projects. The largest coal mine development is the $1 billion Dawson mine expansion which is expected to add around 12 million tonnes of coking and thermal coal capacity, commencing in early 2007. Anglo Coal/Mitsui is also developing the large new Lake Lindsay opencut mine. Rio Tinto is developing its $440 million Clermont opencut mine. Twelve other advanced coal mine developments in Queensland are expected to raise coal production capacity by around 30 million tonnes a year by 2008. 10 figs., 4 tabs.

  16. Neighborhood Energy/Economic Development project

    1991-12-31

    Energy costs impact low income communities more than anyone else. Low income residents pay a larger percentage of their incomes for energy costs. In addition, they generally have far less discretionary energy use to eliminate in response to increasing energy prices. Furthermore, with less discretionary income, home energy efficiency improvements are often too expensive. Small neighborhood businesses are in the same situation. Improved efficiency in the use of energy can improve this situation by reducing energy costs for residents and local businesses. More importantly, energy management programs can increase the demand for local goods and services and lead to the creation of new job training and employment opportunities. In this way, neighborhood based energy efficiency programs can support community economic development. The present project, undertaken with the support of the Urban Consortium Energy Task Force, was intended to serve as a demonstration of energy/economic programming at the neighborhood level. The San Francisco Neighborhood Energy/Economic Development (NEED) project was designed to be a visible demonstration of bringing the economic development benefits of energy management home to low-income community members who need it most. To begin, a Community Advisory Committee was established to guide the design of the programs to best meet needs of the community. Subsequently three neighborhood energy/economic development programs were developed: The small business energy assistance program; The youth training and weatherization program; and, The energy review of proposed housing development projects.

  17. Studies project development off U.K

    Anon.

    1992-01-01

    This paper reports that capital spending on U.K. Continental Shelf (UKCS) oil and gas development in 1992-94 will reach about $36 billion, Arthur Andersen Petroleum Services (AAPS) predicts. Expenditures during the 3 year period would be about 55% more than capital spending for UKCS development in 1989-91 AAPS noted. Another industry forecast, by Grampian Regional Council, Aberdeen, estimates more than 90 new fields could be developed on the UKCS during the next 20 years

  18. Ontogeny of open field activity in rats after neonatal lesioning of the mesocortical dopaminergic projection

    Kalsbeek, A.; de Bruin, J. P.; Matthijssen, M. A.; Uylings, H. B.

    1989-01-01

    In order to examine the effect of neonatal depletion of the dopaminergic mesocortical projection on the development of a prefrontal cortex-mediated behaviour the ontogeny of open field behaviour was studied after neonatal depletion of cortical dopamine. Cortical dopamine was depleted by neonatal

  19. Near field studies within the SKB 91 Project

    Widen, H.; Bengtsson, A.; Grundfelt, B.

    1991-06-01

    A number of near field studies was preformed during the early part of the SKB91 project. This report summaries this work and includes: - Simulation of the steady release from the near field with different time for canister penetration. - Simulation of the release from a repository with 5300 canisters with different penetration times for different parts of the canisters due to manufacturing error, glaciations, inner over pressure and corrosion. - Calculation with a numerical model of the transient release of the instantaneously dissolvable species and the effect of different boundary conditions both at the canister/bentonite and the bentonite/rock interface. - Description of the implementation of a resistance network model for the calculation of the steady state transport resistances in the different pathways from the canisters. - Comparison of two analytical models for the calculation of the release of the instantaneously dissolvable species. (au)

  20. The place and role of project management in the field of sports and recreation services

    Skopin Oleg Viktorovich

    2012-03-01

    Full Text Available The author notes that in Russia the greatest application in the management area of health and fitness services received target-oriented and process approaches. Task that requires immediate action, is to develop an effective system of management development sphere of physical culture and recreational services, based on methodological developments in the field of project management, taking into account the peculiarities of the industry, based on the use of appropriate management technologies.

  1. The Plasma Hearth Process Technology Development Project

    Geimer, R.; Batdorf, J.; Wolfe, P.

    1993-01-01

    The US DOE Office of Technology Development (OTD) is currently evaluating the Plasma Hearth Process (PHP) for potential treatment of several DOE waste types. The PHP is a high-temperature vitrification process that has potential application for a wide range of mixed waste types in both the low-level and transuranic mixed waste categories. The PHP is being tested under both the OTD Mixed Waste Integrated Program and the Buried Waste Integrated Demonstration. Initial testing has been completed on several different surrogate waste forms that are representative of some of the DOE mixed waste streams. Destruction of organic material exceeds that of conventional incineration technologies. The vitrified residual has leaching characteristics comparable to glass formulations produced in the high-level waste program. The first phase of the PHP demonstration project has been successfully completed, and the project is currently beginning a comprehensive second phase of development and testing

  2. Smart Grid Development: Multinational Demo Project Analysis

    Oleinikova I.; Mutule A.; Obushevs A.; Antoskovs N.

    2016-01-01

    This paper analyses demand side management (DSM) projects and stakeholders’ experience with the aim to develop, promote and adapt smart grid tehnologies in Latvia. The research aims at identifying possible system service posibilites, including demand response (DR) and determining the appropriate market design for such type of services to be implemented at the Baltic power system level, with the cooperation of distribution system operator (DSO) and transmission system operator (TSO). This pape...

  3. Bioenergy Project Development and Biomass Supply

    NONE

    2007-07-01

    Modern biomass, and the resulting useful forms of bioenergy produced from it, are anticipated by many advocates to provide a significant contribution to the global primary energy supply of many IEA member countries during the coming decades. For non-member countries, particularly those wishing to achieve economic growth as well as meet the goals for sustainable development, the deployment of modern bioenergy projects and the growing international trade in biomass-based energy carriers offer potential opportunities.

  4. Social acceptability of new territorial development projects

    1993-05-01

    This paper reviews the historical evolution of environmental awareness over the last three decades. The aspects covered include: the growing economic interdependence of nations, the development of new technologies, the internationalization of human rights and the phenomenon of organized trans-nationalism. The paper then develops a framework of territorial development assessment criteria embodying the United Nation's approach towards sustainable growth in which the rights of the human individual to a healthy life in harmony with nature are placed at the forefront of all sustainable growth decision making. Examples of decisional processes during actual hearings to decide on the go-ahead of energy development projects in Italy (a district heating system and a combined cycle gas turbine power plant) are given to evidence optimum ways to have public participation and interaction with government and expert committees take place in line with the United Nation's approach towards development. An important element dealt with is how to optimize the dissemination and use of information

  5. Data management for interdisciplinary field experiments: OTTER project support

    Angelici, Gary; Popovici, Lidia; Skiles, J. W.

    1993-01-01

    The ability of investigators of an interdisciplinary science project to properly manage the data that are collected during the experiment is critical to the effective conduct of science. When the project becomes large, possibly including several scenes of large-format remotely sensed imagery shared by many investigators requiring several services, the data management effort can involve extensive staff and computerized data inventories. The OTTER (Oregon Transect Ecosystem Research) project was supported by the PLDS (Pilot Land Data System) with several data management services, such as data inventory, certification, and publication. After a brief description of these services, experiences in providing them are compared with earlier data management efforts and some conclusions regarding data management in support of interdisciplinary science are discussed. In addition to providing these services, a major goal of this data management capability was to adopt characteristics of a pro-active attitude, such as flexibility and responsiveness, believed to be crucial for the effective conduct of active, interdisciplinary science. These are also itemized and compared with previous data management support activities. Identifying and improving these services and characteristics can lead to the design and implementation of optimal data management support capabilities, which can result in higher quality science and data products from future interdisciplinary field experiments.

  6. The NEED (National Energy Education Development) Project

    Hogan, D.; Spruill, M.

    2012-04-01

    The NEED (National Energy Education Development) Project is a non-profit organization which provides a wide range of K-12 curriculum on energy education topics. The curriculum is specific for primary, elementary, intermediate and secondary levels with age appropriate activities and reading levels. The NEED Project covers a wide range of topics from wind energy, nuclear energy, solar energy, hydropower, hydrogen, fossil fuels, energy conservation, energy efficiency and much more. One of the major strengths of this organization is its Teacher Advisory Board. The curriculum is routinely revised and updated by master classroom teachers who use the lessons and serve on the advisory board. This ensures it is of the highest quality and a useful resource. The NEED Project through a variety of sponsors including businesses, utility companies and government agencies conducts hundreds of teacher professional development workshops each year throughout the United States and have even done some workshops internationally. These workshops are run by trained NEED facilitators. At the workshops, teachers gain background understanding of the energy topics and have time to complete the hands on activities which make up the curriculum. The teachers are then sent a kit of equipment after successfully completing the workshop. This allows them to teach the curriculum and have their students perform the hands on labs and activities in the classroom. The NEED Project is the largest provider of energy education related curriculum in the United States. Their efforts are educating teachers about energy topics and in turn educating students in the hope of developing citizens who are energy literate. Many of the hands on activities used to teach about various energy sources will be described and demonstrated.

  7. Methodology for oil field development; Metodologia para o desenvolvimento de campos de petroleo

    Galeano, Yadira Diaz

    1998-07-01

    The main scope of this work is to study and develop a methodology which allows the elaboration of project for oil field development. There fore it is necessary to consider to consider the integration of the human, technological and economical issues that are important parameters in the engineering project. The spiral concept was applied for the project in order to coordinate, in a reasonable and logical way, the activities involved in the field development, as well as the hierarchical analysis method for the decision making process. The development of an oil field is divided in viability study, preliminary project, final project, project implementation, production and field abandonment cycles. The main components for each cycle are external aspects, environmental criteria, reservoir management, and drilling, completion and well workover, production systems, exportation systems, and risk and economical analysis. The proposed methodology establishes a general scheme for planning and it presents applicable procedures for any field. (author)

  8. The advanced software development workstation project

    Fridge, Ernest M., III; Pitman, Charles L.

    1991-01-01

    The Advanced Software Development Workstation (ASDW) task is researching and developing the technologies required to support Computer Aided Software Engineering (CASE) with the emphasis on those advanced methods, tools, and processes that will be of benefit to support all NASA programs. Immediate goals are to provide research and prototype tools that will increase productivity, in the near term, in projects such as the Software Support Environment (SSE), the Space Station Control Center (SSCC), and the Flight Analysis and Design System (FADS) which will be used to support the Space Shuttle and Space Station Freedom. Goals also include providing technology for development, evolution, maintenance, and operations. The technologies under research and development in the ASDW project are targeted to provide productivity enhancements during the software life cycle phase of enterprise and information system modeling, requirements generation and analysis, system design and coding, and system use and maintenance. On-line user's guides will assist users in operating the developed information system with knowledge base expert assistance.

  9. Developing financeable projects in Central Europe

    Chelberg, R.; Prerad, V. [POWER International, Josefov (Czechoslovakia)

    1995-12-01

    POWER`s engineering and development experience in the Czech Republic creating financeable projects within the power generation industry will be presented. POWER has been involved in the Czech Republic`s privatization process, environmental legislation as well as formation of the regulatory environment. Strategic methods for accomplishing the development of financeable projects often include ownership and financial restructuring of the projects. This is done by utilizing internal cash flows, external debt and equity placement (provided by international financial institutions) by restructuring the facility`s contractual relationships and operations (providing as least cost solution to engineering) and possibly using existing governmental guarantees. In order to make any recommendations on how to come into compliance with the country`s environmental legislation, it is necessary to begin with an analysis of the existing facility. This involves preparation of technical and economic feasibility study, evaluation of technology and preliminary engineering solutions. It further involves restructuring of power sales agreements, heat sales agreements, and fuel supply agreements. The goal is to provide suitable security for the equity and debt financing participants by mitigating risk and creating a single purpose business unit with predictable life and economics.

  10. A method to study the management of urban development projects

    Heurkens, E.

    2011-01-01

    The management of urban development projects in the Netherlands has changed significantly in recent years. These projects have become mainly ‘led’ by developers as they manage the entire life cycle of development projects, while public actors mainly facilitate development projects. This changes the

  11. CRITICAL SUCCESS FACTORS FOR BROWN-FIELD CAPITAL AND RENEWAL PROJECTS

    J. Warchol

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: Manufacturing companies operate in a business environment where incremental growth may be achieved through expansion and renewal of existing plant and facilities. Effective management of the critical success factors of such capital development projects may also provide competitive advantage. These projects tend to be of a brown-field nature, characterised by a significant level of risk arising from the interaction between the project implementation and concurrent operation of the existing physical asset base. So it is vital to understand the factors that influence the success of capital expansion and renewal projects in the brown-field context. Although each project has unique features, there are critical success factors that can be customised for successful outcomes in the brown-field environment. This study identifies five critical success factors applicable to brown-field capital expansion and renewal projects. Managerial focus on the critical factors, and the prospects for successful brown-field projects, are discussed in the paper.

    AFRIKAANSE OPSOMMING: Vervaardigers funksioneer in ‘n sakeomgewing waar voortgesette groei bereik word via uitbreiding en hernuwing van bestaande fasiliteite. Die doeltreffende bestuur van kritiese suksesfaktore van sodanige kapitaalprojekte bied geleentheid vir mededingende voordeel. Projekte van hierdie aard neig om geklassifiseer te word as van herontwikkelingsaard, met betekenisvolle gepaardgaande risiko wat voortspruit uit die interaksie tussen projekimplementering en gelyktydige bedryf van bestaande fisiese bates. Derhalwe is dit belangrik om in die konteks van herontwikkeling aandag te gee aan die kritiese faktore wat ‘n rol speel in die bereiking van sukses. Die navorsing identifiseer vyf kritiese suksesfaktore van belang vir uitbreidings- en vernuwingsprojekte.

  12. Girassol I. Girassol development: project challenges and reservoir uncertainties

    Bancelin, J.P.; Pelleau, R.; Serceau, A. [TotalFinaElf, la Defense 6, 92 - Courbevoie (France)

    2002-10-01

    The Girassol Field is located 210 km northwest of Luanda, the Angolan capital, and about 150 km from shore. Girassol was the first discovery made in the prolific Block 17. This was followed by Dalia, Rosa, Lirio, Jasmim, Cravo, Orchidea, etc. April 1996: Girassol field is discovered on Block 17 in deep waters, offshore Angola. July 1998: The Girassol development project is approved by all parties. December 2001: Less than three and a half years after approval, Girassol comes on-stream. By the end of 2001, daily production is 100000 b/d with the production plateau of 200000 b/d to be reached by April 2002. The reservoir, located in 1,400 m water depth, is large (10 km by 14 km). Estimated oil in place is 1,550 mmbbls with recoverable reserves put at 725 mmbbls. The oil quality of 32 deg API is close to Brent specifications. The Girassol development scheme is based on 39 sub-sea wells - 23 oil producers, 14 water injectors and two gas injectors. The field will be developed in two phases: the first phase, completed in December 2001, includes 11 wells - eight oil producers, two water injectors and one gas injector. The second phase development is ongoing and will be completed mid-2003. The overall investment for the two phases of the Girassol development is US$ 2.8 bn. The Girassol project team had to fulfill three main objectives: first priority was given to technical quality; second priority was to closely monitor the development budget and contain the final cost; third priority was to achieve first oil as early as possible. Describe the Girassol reservoir and explain the main subsurface uncertainties; describe the selected development scheme; explain Girassol's major challenges; describe the contractual strategy information on cost, schedule and the project organisation are given. (authors)

  13. Development of funding project risk management tools.

    2013-11-01

    Funding project risk management is a process for identifying, assessing, and prioritizing project funding risks. To plan to : minimize or eliminate the impact of negative events, one must identify what projects have higher risk to respond to potentia...

  14. Report on the survey of the project on the environmentally friendly type energy community field test. Investigative project for development and commercialization of recycle technology of waste edible oil; 2001 nendo kankyo chowa gata energy community field test jigyo chosa hokokusho. Hai shokuryo yu no recycle gijutsu kaihatsu to jitsuyoka no tameno chosa jigyo

    NONE

    2002-06-01

    An investigative study was made of the use of waste edible oil as fuel and recycle use of residual food in the food service business. As to the existence/recovery of edible oil, it was found out that waste edible oil of 15.9g/meal per capita was discharged at multiple wide-area distributed shops and that the total amount reached 1,861kl/y in the country. Concerning the technology for using it as biodiesel fuel, Ronford Co., which has the most actual results of the technology, recovers waste edible oil in Kyoto City, refines it and uses it as fuel for the City's garbage truck. About the use of waste edible oil as boiler use fuel, there are examples in Sapporo Grand Hotel, which has been contributing to energy conservation for more than five years. In the assessment of the profitability as project, for the direct combustion for boiler fuel use, the same/large heat supply system is a prerequisite, and for the hot stove loaded type direct combustion, there is an element of the technology development. Therefore, the use as bio-diesel fuel is most expected, though there is a taxation problem. (NEDO)

  15. Report on the survey of the project on the environmentally friendly type energy community field test. Investigative project for development and commercialization of recycle technology of waste edible oil; 2001 nendo kankyo chowa gata energy community field test jigyo chosa hokokusho. Hai shokuryo yu no recycle gijutsu kaihatsu to jitsuyoka no tameno chosa jigyo

    NONE

    2002-06-01

    An investigative study was made of the use of waste edible oil as fuel and recycle use of residual food in the food service business. As to the existence/recovery of edible oil, it was found out that waste edible oil of 15.9g/meal per capita was discharged at multiple wide-area distributed shops and that the total amount reached 1,861kl/y in the country. Concerning the technology for using it as biodiesel fuel, Ronford Co., which has the most actual results of the technology, recovers waste edible oil in Kyoto City, refines it and uses it as fuel for the City's garbage truck. About the use of waste edible oil as boiler use fuel, there are examples in Sapporo Grand Hotel, which has been contributing to energy conservation for more than five years. In the assessment of the profitability as project, for the direct combustion for boiler fuel use, the same/large heat supply system is a prerequisite, and for the hot stove loaded type direct combustion, there is an element of the technology development. Therefore, the use as bio-diesel fuel is most expected, though there is a taxation problem. (NEDO)

  16. Advanced EVA Suit Camera System Development Project

    Mock, Kyla

    2016-01-01

    The National Aeronautics and Space Administration (NASA) at the Johnson Space Center (JSC) is developing a new extra-vehicular activity (EVA) suit known as the Advanced EVA Z2 Suit. All of the improvements to the EVA Suit provide the opportunity to update the technology of the video imagery. My summer internship project involved improving the video streaming capabilities of the cameras that will be used on the Z2 Suit for data acquisition. To accomplish this, I familiarized myself with the architecture of the camera that is currently being tested to be able to make improvements on the design. Because there is a lot of benefit to saving space, power, and weight on the EVA suit, my job was to use Altium Design to start designing a much smaller and simplified interface board for the camera's microprocessor and external components. This involved checking datasheets of various components and checking signal connections to ensure that this architecture could be used for both the Z2 suit and potentially other future projects. The Orion spacecraft is a specific project that may benefit from this condensed camera interface design. The camera's physical placement on the suit also needed to be determined and tested so that image resolution can be maximized. Many of the options of the camera placement may be tested along with other future suit testing. There are multiple teams that work on different parts of the suit, so the camera's placement could directly affect their research or design. For this reason, a big part of my project was initiating contact with other branches and setting up multiple meetings to learn more about the pros and cons of the potential camera placements we are analyzing. Collaboration with the multiple teams working on the Advanced EVA Z2 Suit is absolutely necessary and these comparisons will be used as further progress is made for the overall suit design. This prototype will not be finished in time for the scheduled Z2 Suit testing, so my time was

  17. Smart Grid Development: Multinational Demo Project Analysis

    Oleinikova I.

    2016-12-01

    Full Text Available This paper analyses demand side management (DSM projects and stakeholders’ experience with the aim to develop, promote and adapt smart grid tehnologies in Latvia. The research aims at identifying possible system service posibilites, including demand response (DR and determining the appropriate market design for such type of services to be implemented at the Baltic power system level, with the cooperation of distribution system operator (DSO and transmission system operator (TSO. This paper is prepared as an extract from the global smart grid best practices, smart solutions and business models.

  18. Smart Grid Development: Multinational Demo Project Analysis

    Oleinikova, I.; Mutule, A.; Obushevs, A.; Antoskovs, N.

    2016-12-01

    This paper analyses demand side management (DSM) projects and stakeholders' experience with the aim to develop, promote and adapt smart grid tehnologies in Latvia. The research aims at identifying possible system service posibilites, including demand response (DR) and determining the appropriate market design for such type of services to be implemented at the Baltic power system level, with the cooperation of distribution system operator (DSO) and transmission system operator (TSO). This paper is prepared as an extract from the global smart grid best practices, smart solutions and business models.

  19. Proposed tokamak poloidal field system development program

    Rogers, J.D.; Vogel, H.F.; Warren, R.W.; Weldon, D.M.

    1977-05-01

    A program is proposed to develop poloidal field components for TNS and EPR size tokamak devices and to test these components in realistic circuits. Emphasis is placed upon the development of the most difficult component, the superconducting ohmic-heating coil. Switches must also be developed for testing the coils, and this switching technology is to be extended to meet the requirements for the large scale tokamaks. Test facilities are discussed; power supplies, including a homopolar to drive the coils, are considered; and poloidal field systems studies are proposed.

  20. Draft project management update to the Iowa DOT Project Development Manual : final report.

    2016-08-01

    This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to : incorporate a greater focus on project management in their project development process. : A technical advisory committee (TAC) ...

  1. Generation of a field development plan, North Field, North Oman

    Bostock, D.R.; Adams, S.; Mercadier, C.; Milatz, H.; van der Weerd, H.; Walker, T.

    1991-01-01

    This paper reports on the Natih Field in North Oman which is a complex domal fractured limestone structure with a STOIIP of some 50 million m 3 . Initially subjected to a depletion drive, rapidly dropping pressures resulted in a switch to water injection and then to gas injection to promote gas oil gravity drainage. In determining which production mechanism to promote an integrated approach has been taken. Field tests used tracers to investigate the problems associated with water injection; fracture orientation and intensity has been determined using core data including palaeomagnetics, FMS logs and out-crop studies; initial oil saturations have been determined within a give range using resistivity and pulsed neutron logs as well as capillary pressure curves to overcome problems of mixed wettability; to monitor gas saturation development in the matrix recourse has been made to Borehole Gravity Meter; special core analysis on restored state cores has been utilized to characterize wettability and relative permeability as input to both monitoring the water influx and to reservoir simulation. Development of a simulator to incorporate all the necessary physics of gravity drainage, including block to block interaction, has been undertaken at the research laboratories in the Netherlands and, using the understanding of the field built up through the above studies, a successful history match was achieved

  2. HTSL massive motor. Project: Motor field calculation. Final report

    Gutt, H.J.; Gruener, A.

    2003-01-01

    HTS motors up to 300 kW were to be developed and optimized. For this, specific calculation methods were enhanced to include superconducting rotor types (hysteresis, reluctance and permanent magnet HTS rotors). The experiments were carried out in a SHM70-45 hysteresis motor. It was shown how static and dynamic trapped field magnetisation of the rotor with YBCO rings will increase flux in the air gap motor, increasing the motor capacity to twice its original level. (orig.) [de

  3. Minerals and energy: major development projects - April 2005 listing

    Ian Haine (and others) [Australian Bureau of Agricultural and Resource Economics (ABARE), Canberra, ACT (Australia)

    2005-06-01

    The article describes trends in project development and investment in the minerals and energy sector in Australia. It lists competed projects and committed projects. Black coal projects completed during November 2004 to April 2005 were: Dendrobium underground and Mandalong longwall mining expansion projects in New South Wales and development of Curragh North and Eaglefield opencut mine in Queensland. One of the more significant newly listed projects is Macarthur Coal's Queensland Coke Project near Rockhampton. Capital cost and values of projects are included. The full listing of 229 projects is available electronically from ABARE. The list is released around May and November each year. 10 figs., 4 tabs.

  4. Unrealized Architectural Projects in Lithuania: Historical Development

    Indrė Gudelytė

    2012-05-01

    Full Text Available The “unrealized architectural projects” are the building projects, carried out under the specific design task and intended to be built in a particular place (site, though, for certain reasons and circumstances, have never been constructed. However, up to the present day, the topic of the “unbuilt” has been analyzed just episodically in literature and sources. The article touches upon the historical development of unrealized architectural works, as well as their artistic value and role within various historical periods of Lithuanian architecture. One of the chapters briefly reviews the relevance and development of unrealized projects during the period since Czarist Russian occupation (1795 to the restoration of Lithuanian independence (1990. Furthermore, the deeper analysis of the Soviet period (1940–1990 “dead” architecture is presented. While exploring “the unrealized”, attention has been also paid to what was actu ally built, therefore the prevailing architectural styles, tendencies and examples of the corresponding decade (in Lithuania and worldwide have been studied.Article in Lithuanian

  5. Cyrogenic Life Support Technology Development Project

    Bush, David R.

    2015-01-01

    KSC has used cryogenic life support (liquid air based) technology successfully for many years to support spaceflight operations. This technology has many benefits unique to cryogenics when compared to traditional compressed gas systems: passive cooling, lighter, longer duration, and lower operating pressure. However, there are also several limiting factors that have prevented the technology from being commercialized. The National Institute of Occupational Safety and Health, Office of Mine Safety and Health Research (NIOSH-OMSHR) has partnered with NASA to develop a complete liquid air based life support solution for emergency mine escape and rescue. The project will develop and demonstrate various prototype devices and incorporate new technological innovations that have to date prevented commercialization.

  6. Projected uranium requirements of developing countries

    Anon.

    1990-01-01

    The objective of this paper is to examine the uranium requirements of developing countries both in aggregate and individually. Although the cumulative uranium requirements of these countries are expected to account for less than eight percent of total requirements, the fact that many of these countries are expressing renewed interest in nuclear is, in itself, encouraging. The countries analyzed in this paper are Argentina, Brazil, Egypt, India, Israel, Mexico, Pakistan, South Africa, South Korea and Taiwan. For each country, the existing and planned nuclear capacity levels have been identified and capacity factors have been projected. For countries with no previous nuclear power, the world weighted average capacity factor for the specific reactor type is utilized. Other factors influencing nuclear power demand and operations of these developing countries will be discussed, and finally, uranium requirements based on a calculated optimal tails assay of .30 will be provided

  7. Development of high field superconducting magnet

    Irie, Fujio; Takeo, Masakatsu.

    1986-01-01

    Recently, in connection with nuclear fusion research, the development of high field superconducting magnets showed rapid progress. The development of high field magnets of 15 T class by the techniques of winding after heat treatment has been continued in various places, as these techniques are suitable to make large magnets. In 1985, Kyushu University attained the record of 15.5 T. However in high field magnets, there are many problems peculiar to them, and the basic research related to those is demanded. In this report, these general problems, the experience of the design and manufacture in Kyushu University and the related problems are described. The superconducting magnet installed in the Superconducting Magnet Research Center of Kyushu University attained the record of 15.5 T for the first time in March, 1985. In superconducting magnets, very difficult problem must be solved since superconductivity, heat and mechanical force are inter related. The problems of the wire materials for high field, the scale of high field magnets, the condition limiting mean current density, and the development of high field magnets in Kyushu University are described. (Kako, I.)

  8. Further Development of HS Field Theory

    Abdurrahman, Abdulmajeed; Faridani, Jacqueline; Gassem, Mahmoud

    2006-04-01

    We present a systematic treatment of the HS Field theory of the open bosonic string and discuss its relationship to other full string field theories of the open bosonic string such as Witten's theory and the CVS theory. In the development of the HS field theory we encounter infinite dimensional matrices arising from the change of representation between the two theories, i.e., the HS field theory and the full string field theory. We give a general procedure of how to invert these gigantic matrices. The inversion of these matrices involves the computation of many infinite sums. We give the values of these sums and state their generalizations arising from considering higher order vertices (i.e., more than three strings) in string field theory. Moreover, we give a general procedure, on how to evaluate the generalized sums, that can be extended to many generic sums of similar properties. We also discuss the conformal operator connecting the HS field theory to that of the CVS string field theory.

  9. Agile Project Management for e-Learning Developments

    Doherty, Iain

    2010-01-01

    We outline the project management tactics that we developed in praxis in order to manage elearning projects and show how our tactics were enhanced through implementing project management techniques from a formal project management methodology. Two key factors have contributed to our project management success. The first is maintaining a clear…

  10. Project development and commercialization of on-line analysis systems

    Watt, J.S.

    1997-01-01

    A project team first in the Australian Atomic Energy Commission (AAEC) and since 1982 in CSIRO has developed many on-line analysis systems for the mineral and energy industries. The development of these projects has followed a common pattern of laboratory R and D, field trials, commercialisation and technology transfer. This successful pattern is illustrated using examples of the development of systems for the on-line analysis of mineral slurries, for determination of the ash content of coal on conveyors, and for determination of the flow rates of oil, water and gas in pipelines. The first two systems are licensed to Australian companies, Amdel Ltd and Mineral Control Instrumentation Ltd. Both systems are used by industry worldwide, and are the market leaders for radioisotope gauges in their application field. The third system, the multiphase flow meter, was licensed in 1997 to Kvaerner FSSL Ltd of Aberdeen. This meter has even greater potential than the other two systems for economic benefit from its used and for numbers of installations. The on-line analysis systems have been developed to increase the productivity of the Australian mineral and energy industries, and to provide economic benefit to Australia. The economic benefit sought is predominantly improved process control based on use of the instrument, rather than from its sale. Sales of instruments are significant, however, with about A$80 million from the analysis systems and their derivatives since the 1970s. Some of the issues associated with the development of the on-line analysis system are outlined

  11. Development of a Micro-Fabricated Total-Field Magnetometer

    2011-03-01

    are made with fluxgate technologies. Fluxgates have lower sensitivity than Cs magnetometers , yet they continue to be used in small wands simply...extraction process by providing the sensitivity of a Cs magnetometer with the convenience and low cost of a fluxgate wand. Extremely small and low cost...FINAL REPORT Development of a Micro-Fabricated Total-Field Magnetometer SERDP Project MR-1512 MARCH 2011 Mark Prouty Geometrics, Inc

  12. Field verification of social and environmental issues of selected water sector projects in Punjab-Pakistan

    Ayesha, A.

    2012-01-01

    Irrigation helps in increasing the agricultural yield and the irrigation projects are carried out for the welfare of people. The importance of environment for sustainable development of irrigation projects has been realized. Environmental Impact Assessment is being increasingly used as a tool for appropriate environmental planning. In Pakistan, PEP A (Pakistan Environmental Protection Act),1997 establishes the framework to carry out Environmental Assessment of development projects. Various national and international agencies have developed Environmental Assessment Guidelines and Checklists for systematic evaluation of environmental impacts and their mitigation. The Social and Environmental Management Unit of Punjab Irrigation and Drainage Authority developed checklist for assessment of irrigation projects in 2007. The present study was conducted on three water sector projects namely: Concrete Lining of Dhudi Minor, Improving Nikki Deg Drain System and Rehabilitation of Khanki Barrage. The field verification of social and environmental issues of the projects was carried out according to the checklist of Social and Environmental Management Unit. The most noticeable impacts which were identified include: extended canal closure, emissions and effluents, waste generation and disposal, effect on flora, public health and safety, land acquisition, and social issues. The mitigatory measures proposed: proper project scheduling to minimize the canal closure periods, waste disposal through proper planning, preparation of detailed resettlement action plans and compensation, location of labor camps away from the settlements, avoiding unnecessary cutting of trees, and deployed machinery should be in good working condition. The recommendations of the study are to review and improve the checklists through a gradual and phased process into a more comprehensive social and environmental assessment process; capacity building of all the stake holders; collaboration between different

  13. Hierarchy Software Development Framework (h-dp-fwk) project

    Zaytsev, A

    2010-01-01

    Hierarchy Software Development Framework provides a lightweight tool for building portable modular applications for performing automated data analysis tasks in a batch mode. The history of design and development activities devoted to the project has begun in March 2005 and from the very beginning it was targeting the case of building experimental data processing applications for the CMD-3 experiment which is being commissioned at Budker Institute of Nuclear Physics (BINP, Novosibirsk, Russia). Its design addresses the generic case of modular data processing application operating within the well defined distributed computing environment. The main features of the framework are modularity, built-in message and data exchange mechanisms, XInclude and XML schema enabled XML configuration management tools, dedicated log management tools, internal debugging tools, both dynamic and static module chains support, internal DSO version and consistency checking, well defined API for developing specialized frameworks. It is supported on Scientific Linux 4 and 5 and planned to be ported to other platforms as well. The project is provided with the comprehensive set of technical documentation and users' guides. The licensing schema for the source code, binaries and documentation implies that the product is free for non-commercial use. Although the development phase is not over and many features are to be implemented yet the project is considered ready for public use and creating applications in various fields including development of events reconstruction software for small and moderate scale HEP experiments.

  14. Hierarchy Software Development Framework (h-dp-fwk) project

    Zaytsev, A, E-mail: Alexander.S.Zaytsev@gmail.co [Budker Institute of Nuclear Physics, Novosibirsk (Russian Federation)

    2010-04-01

    Hierarchy Software Development Framework provides a lightweight tool for building portable modular applications for performing automated data analysis tasks in a batch mode. The history of design and development activities devoted to the project has begun in March 2005 and from the very beginning it was targeting the case of building experimental data processing applications for the CMD-3 experiment which is being commissioned at Budker Institute of Nuclear Physics (BINP, Novosibirsk, Russia). Its design addresses the generic case of modular data processing application operating within the well defined distributed computing environment. The main features of the framework are modularity, built-in message and data exchange mechanisms, XInclude and XML schema enabled XML configuration management tools, dedicated log management tools, internal debugging tools, both dynamic and static module chains support, internal DSO version and consistency checking, well defined API for developing specialized frameworks. It is supported on Scientific Linux 4 and 5 and planned to be ported to other platforms as well. The project is provided with the comprehensive set of technical documentation and users' guides. The licensing schema for the source code, binaries and documentation implies that the product is free for non-commercial use. Although the development phase is not over and many features are to be implemented yet the project is considered ready for public use and creating applications in various fields including development of events reconstruction software for small and moderate scale HEP experiments.

  15. Unified field theory on the basis of the projective theory of relativity

    Lessner, G.

    1982-01-01

    A unified field theory is developed on the basis of the five-dimensional vacuum equations R/sub munu/ = 0 in the projective theory of relativity. The four-dimensional field equations following from R/sub munu/ = 0 by projection are a generalized Einstein-Maxwell theory, for which the generalization is given by a scalar field. The particle concept based on these equations represents the intrinsic particle properties, which are the rest mass, or the energy in case of photons and neutrinos, the charge and the spin by integrals of the field distribution extended over spacelike hypersurfaces. The energy concept is based on Moller's energy-momentum complex. Moller's argument against his energy-momentum complex is discussed and refuted. The spin concept is derived from the axial symmetry of the field distribution. The stationary axially symmetric field is studied in detail. In the spherically symmetric static case the solutions of the field equations are given and investigated for their particle properties. It is shown that one and only one type of solution yields a good approach to the distribution of charge and rest mass in the proton. However, none of the spherically symmetric solutions represents the electron

  16. Fast Charging Electric Vehicle Research & Development Project

    Heny, Michael

    2014-03-31

    The research and development project supported the engineering, design and implementation of on-road Electric Vehicle (“EV”) charging technologies. It included development of potential solutions for DC fast chargers (“DCFC”) capable of converting high voltage AC power to the DC power required by EVs. Additional development evaluated solutions related to the packaging of power electronic components and enclosure design, as well as for the design and evaluation of EV charging stations. Research compared different charging technologies to identify optimum applications in a municipal fleet. This project collected EV usage data and generated a report demonstrating that EVs, when supported by adequate charging infrastructure, are capable of replacing traditional internal combustion vehicles in many municipal applications. The project’s period of performance has demonstrated various methods of incorporating EVs into a municipal environment, and has identified three general categories for EV applications: Short Commute: Defined as EVs performing in limited duration, routine commutes. - Long Commute: Defined as tasks that require EVs to operate in longer daily mileage patterns. - Critical Needs: Defined as the need for EVs to be ready at every moment for indefinite periods. Together, the City of Charlottesville, VA (the “City”) and Aker Wade Power Technologies, LLC (“Aker Wade”) concluded that the EV has a viable position in many municipal fleets but with limited recommendation for use in Critical Needs applications such as Police fleets. The report also documented that, compared to internal combustion vehicles, BEVs have lower vehicle-related greenhouse gas (“GHG”) emissions and contribute to a reduction of air pollution in urban areas. The enhanced integration of EVs in a municipal fleet can result in reduced demand for imported oil and reduced municipal operating costs. The conclusions indicated in the project’s Engineering Report (see Attachment

  17. Overview of autoventing turbine technology development project

    Waldrop, W.R.

    1991-01-01

    This paper reports on low concentrations of dissolved oxygen (DO) in the discharge of hydro plants which represents one of the most significant environmental concerns confronting the hydropower industry. This is especially of concern to utilities attempting to relicense older plants and to build new facilities. One method which shows promise is the autoventing turbine (AVT). The concept of an AVT involves air to be aspirated into the water as it passes through the turbine whenever concentrations of DO are less than desired. Because of this simple and natural process of aeration, the AVT promises to be more cost efficient and reliable than any of the other techniques. This has been demonstrated through experimentation at TVA's Norris Dam. An applied research project is being conducted to develop experimental and numerical methods to allow for reliable design and deployment of this new environmentally improved hydroturbine. TVA is providing overall coordination for this research which is being performed cooperatively with the U.S. Army Corps of Engineers, the U.S. Bureau of Reclamation, and the Iowa Institute of Hydraulic Research. This applied research project is fully integrated with a scale model test program jointly supported and conducted by TVA and Voith Hydro to test alternative locations for venting air into replacement turbine runners for Norris Dam

  18. Development of PETAL diagnostics: PETAPhys project

    Raffestin, D.; Boutoux, G.; Baggio, J.; Batani, D.; Blanchot, N.; Bretheau, D.; Hulin, S.; D'Humieres, E.; Granet, F.; Longhi, Th.; Meyer, Ch.; Moreno, Q.; Nuter, R.; Rault, J.; Tikhonchuk, V.; Universite de Bordeaux/Celia Team; CEA. DAM/Cesta Team

    2017-10-01

    Beginning of autumn 2017, PETAL, a Petawatt laser beam, will be operated for experiments on the LMJ facility at the CEA/ Cesta research center. The PETAPhys project provides a support to the qualification phase of the PETAL laser operation. Within the PETAPhys project, we are developing two simple and robust diagnostics permitting both to characterize the focal spot of the PETAL beam and to measure the hard X-ray spectrum at each shot. The first diagnostic consists in optical imaging of the PETAL beam focal spot in the spectral range of the second and third harmonic radiation emitted from the target. The second diagnostic is a hard X-ray dosimeter consisting in a stack of imaging plates (IP) and filters, either placed inside a re-entrant tube or inserted close to target. Numerical simulations as well as experiments on small scale facilities have been performed to design these diagnostics. If available, preliminary results from PETAL experiments will be discussed. We acknowledge the financial support from the French National Research Agency (ANR) in the framework of ``the investments for the future'' Programme IdEx Bordeaux-LAPHIA (ANR-10-IDEX-03-02).

  19. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  20. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE's overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program

  1. Development of neutron calibration field using accelerators

    Baba, Mamoru [Tohoku Univ., Cyclotron and Radioisotope Center, Sendai, Miyagi (Japan)

    2003-03-01

    A brief summary is given on the fast neutron calibration fields for 1) 8 keV to 15 MeV range, and 2) 30-80 MeV range. The field for 8 keV to 15 MeV range was developed at the Fast Neutron Laboratory (FNL) at Tohoku University using a 4.5 MV pulsed Dynamitron accelerator and neutron production reactions, {sup 45}Sc(p, n), {sup 7}Li(p, n), {sup 3}H(p, n), D(d, n) and T(d, n). The latter 30-80 MeV fields are setup at TIARA of Takasaki Establishment of Japan Atomic Energy Research Institute, and at Cyclotron Radio Isotope Center (CYRIC) of Tohoku University using a 90 MeV AVF cyclotron and the {sup 7}Li(p, n) reaction. These fields have been applied for various calibration of neutron spectrometers and dosimeters, and for irradiation purposes. (author)

  2. Near field communication recent developments and library implications

    McHugh, Sheli

    2014-01-01

    Near Field Communication is a radio frequency technology that allows objects, such as mobile phones, computers, tags, or posters, to exchange information wirelessly across a small distance. This report on the progress of Near Field Communication reviews the features and functionality of the technology and summarizes the broad spectrum of its current and anticipated applications. We explore the development of NFC technology in recent years, introduce the major stakeholders in the NFC ecosystem, and project its movement toward mainstream adoption. Several examples of early implementation of NFC

  3. Recent developments of the EXCYT project

    Ciavola, G.

    1997-01-01

    The aim of the EXCYT project is to develop a facility for the production and the acceleration of exotic beams up to 8 MeV/amu. The primary beams shall be provided by the now operational K-800 superconducting cyclotron and the exotic ions will be accelerated by a 15 MV Tandem. We will describe the cyclotron source and its axial injection system, the transfer beam line sending the primary beams onto the target and the target-ion source unit. Also we will describe the planned high resolution isobar separator that should allow to perform either nuclear or astrophysical and material science experiments. This separator consists of a preseparator and two main stages and should provide an overall mass resolving power up to m/Dm∼20000. (orig.)

  4. Recent developments of the EXCYT project

    Ciavola, G. [Ist. Nazionale di Fis. Nucl., Catania (Italy). Lab. Nazionale del Sud; Calabretta, L. [Ist. Nazionale di Fis. Nucl., Catania (Italy). Lab. Nazionale del Sud; Cuttone, G. [Ist. Nazionale di Fis. Nucl., Catania (Italy). Lab. Nazionale del Sud; Di Bartolo, G. [Ist. Nazionale di Fis. Nucl., Catania (Italy). Lab. Nazionale del Sud; Finocchiaro, P. [Ist. Nazionale di Fis. Nucl., Catania (Italy). Lab. Nazionale del Sud; Gammino, S. [Ist. Nazionale di Fis. Nucl., Catania (Italy). Lab. Nazionale del Sud; Gu, M. [Ist. Nazionale di Fis. Nucl., Catania (Italy). Lab. Nazionale del Sud; Migneco, E. [Ist. Nazionale di Fis. Nucl., Catania (Italy). Lab. Nazionale del Sud; Qin, J. [Ist. Nazionale di Fis. Nucl., Catania (Italy). Lab. Nazionale del Sud; Raia, G. [Ist. Nazionale di Fis. Nucl., Catania (Italy). Lab. Nazionale del Sud; Rifuggiato, D. [Ist. Nazionale di Fis. Nucl., Catania (Italy). Lab. Nazionale del Sud; Rovelli, A. [Ist. Nazionale di Fis. Nucl., Catania (Italy). Lab. Nazionale del Sud; Vinciguerra, D. [Ist. Nazionale di Fis. Nucl., Catania (Italy). Lab. Nazionale del Sud; Wollnik, H. [University of Giessen, Giessen (Germany)

    1997-04-14

    The aim of the EXCYT project is to develop a facility for the production and the acceleration of exotic beams up to 8 MeV/amu. The primary beams shall be provided by the now operational K-800 superconducting cyclotron and the exotic ions will be accelerated by a 15 MV Tandem. We will describe the cyclotron source and its axial injection system, the transfer beam line sending the primary beams onto the target and the target-ion source unit. Also we will describe the planned high resolution isobar separator that should allow to perform either nuclear or astrophysical and material science experiments. This separator consists of a preseparator and two main stages and should provide an overall mass resolving power up to m/Dm{approx}20000. (orig.).

  5. Knowledge Management in Product Development Projects

    Sheik Muhamad, S.

    2016-01-01

    Full text: Product data management system (PDM) solutions control vast quantities of information generated by engineers during the product development process. They provide vaulting capabilities to control access to shared data,workflow to distribute it, and configured product structures to relate it to product components. Nuclear Malaysia has the desire to have a proper CAD management system and this is achieved with the use of PDM system to manage all their designs throughout the product lifecycle, i.e., for drawing distribution and design change. The type of documents that Nuclear Malaysia manages are CAD files (as generated by CATIA, AUTOCAD), engineering files, reports, project files, documents (WORD, PDF), spreadsheet (EXCEL), bills of material, manufacturing processes and drawings. Besides managing drawings, we also want to control and manage engineering changes (ECO & ECR) in electronic format. (author

  6. Great Plains Wind Energy Transmission Development Project

    Brad G. Stevens, P.E.; Troy K. Simonsen; Kerryanne M. Leroux

    2012-06-09

    In fiscal year 2005, the Energy & Environmental Research Center (EERC) received funding from the U.S. Department of Energy (DOE) to undertake a broad array of tasks to either directly or indirectly address the barriers that faced much of the Great Plains states and their efforts to produce and transmit wind energy at the time. This program, entitled Great Plains Wind Energy Transmission Development Project, was focused on the central goal of stimulating wind energy development through expansion of new transmission capacity or development of new wind energy capacity through alternative market development. The original task structure was as follows: Task 1 - Regional Renewable Credit Tracking System (later rescoped to Small Wind Turbine Training Center); Task 2 - Multistate Transmission Collaborative; Task 3 - Wind Energy Forecasting System; and Task 4 - Analysis of the Long-Term Role of Hydrogen in the Region. As carried out, Task 1 involved the creation of the Small Wind Turbine Training Center (SWTTC). The SWTTC, located Grand Forks, North Dakota, consists of a single wind turbine, the Endurance S-250, on a 105-foot tilt-up guyed tower. The S-250 is connected to the electrical grid on the 'load side' of the electric meter, and the power produced by the wind turbine is consumed locally on the property. Establishment of the SWTTC will allow EERC personnel to provide educational opportunities to a wide range of participants, including grade school through college-level students and the general public. In addition, the facility will allow the EERC to provide technical training workshops related to the installation, operation, and maintenance of small wind turbines. In addition, under Task 1, the EERC hosted two small wind turbine workshops on May 18, 2010, and March 8, 2011, at the EERC in Grand Forks, North Dakota. Task 2 involved the EERC cosponsoring and aiding in the planning of three transmission workshops in the midwest and western regions. Under Task

  7. Management Guidelines for Database Developers' Teams in Software Development Projects

    Rusu, Lazar; Lin, Yifeng; Hodosi, Georg

    Worldwide job market for database developers (DBDs) is continually increasing in last several years. In some companies, DBDs are organized as a special team (DBDs team) to support other projects and roles. As a new role, the DBDs team is facing a major problem that there are not any management guidelines for them. The team manager does not know which kinds of tasks should be assigned to this team and what practices should be used during DBDs work. Therefore in this paper we have developed a set of management guidelines, which includes 8 fundamental tasks and 17 practices from software development process, by using two methodologies Capability Maturity Model (CMM) and agile software development in particular Scrum in order to improve the DBDs team work. Moreover the management guidelines developed here has been complemented with practices from authors' experience in this area and has been evaluated in the case of a software company. The management guidelines for DBD teams presented in this paper could be very usefully for other companies too that are using a DBDs team and could contribute towards an increase of the efficiency of these teams in their work on software development projects.

  8. Optimizing development projects in mature basins

    Swan, P.J. [BP Exploration, Aberdeen (United Kingdom)

    1995-08-01

    BP Exploration wishes to grow its gas business substantially and the Southern North Sea area expects to be a significant contributor to this growth. The Southern North Sea gas basin is characterised by a relatively large number of small prospects and discoveries lying within the catchment areas of existing pipeline systems serving larger fields currently in production. This growth will be achieved through expansion of production from existing large mature fields and new satellite developments, connected to existing pipeline systems. Significant modification to existing infrastructure will be required to bring the new production on stream. The low materiality of many of these new developments means that, based on current cost paradigms, they are sub-economic or do not offer returns commensurate with the risk. Also, implementation based on classical approaches tends to be resource-intensive in terms of key skills. Critical areas of concern in delivering growth objectives therefore relate to management of cost, implementation time and productivity of key human resources. The general approach adopted in pursuit of high performance includes a number of features: Innovative approaches to the service industries; simplification of equipment; streamlining of methodologies; application of novel technology; alignment of motivation of all contributors to overall objectives; and shifting the paradigm of risk. BP believes that this approach is a major breakthrough in extending and expanding the life of its assets in the Southern North Sea and is representative of the trend of optimization in the extended life of the Basin in general.

  9. Recent developments in quantum field theory

    Ambjoern, J.; Petersen, J.L.; Durhuus, B.J.

    1985-01-01

    This is the second volume in a set of three containing the proceedings of 3 conferences held in Copenhagen, to mark the centennial of Niels Bohr. The purpose of this symposium was to bring together theoretical particle physicists to discuss the present status and, in particular, the latest developments in quantum field theory, in their broadest aspects. This volume contains the main 19 lectures and reflects the contemporary status of a line of development, one of whose initiators was Niels Bohr. (orig.)

  10. Recent developments in the BRAMS project

    Calders, Stijn; Lamy, Hervé; Gamby, Emmanuel; Ranvier, Sylvain

    2014-01-01

    In 2009, the Belgian Institute for Space Aeronomy (BIRA-IASB) initiated the development of BRAMS, a Belgian network of radio receiving stations using forward scattering techniques to detect meteors. The primary goals of the project are (1) to collect data and to provide them to the community; (2) to retrieve information about the meteoroid trajectory; and (3) to study the activity profiles of the main meteor showers. In this paper, the work performed since the 2012 International Meteor Conference in La Palma, Canary Islands, Spain, is presented: (1) a software to decode the GPS signal has been developed and added to all BRAMS stations; (2) a workshop about automatic detection of features in radio data was organized in order to discuss about suitable image processing techniques that can be used for radio meteor echoes detection in the BRAMS spectrograms; (3) to assess the quality of such an image processing technique, a big set of manually counted meteors is necessary. A web application has been developed to support this task and facilitate the comparison of counts by different users; (4) to compute the meteoroid flux and for other applications, the radiation pattern of the different antennas must be known. Someone has been hired recently to make simulations of these radiations patterns as well as to carry out measurement campaigns; and (5) detection of solar flares in BRAMS data has been investigated.

  11. New developments in IPD-projects

    Ir. Dick van Schenk Brill; Ir. K. Kater

    2004-01-01

    Our IPD-projects have changed: more international partners became involved and simultaneously we started to carry out real projects for real companies. This caused a number of problems. In order to be able to give full support to the projects and conclude them with a nice, formal symposium we need

  12. Project-90 Near-field calculations using CALIBRE

    Worgan, K.; Robinson, P.

    1992-02-01

    A comprehensive set of near-field calculations for the Swedish Nuclear Power Inspectorates Project-90 safety assessment has been performed using the CALIBRE model. In the majority of cases considered the redox front migrates through the bentonite buffer and into the rock, where it becomes effectively immobilised. The fracture remains in a reducing state, which means that for solubility-limited nuclides, the concentration at the bentonite/fracture interface can never be greater than the reducing solubility limit. The calculations also show that significant retardation occurs for nuclides which are even moderately sorbed. The effect is less pronounced in the wider fracture and high flow cases, as the opportunity for diffusion from the fracture to the rock matrix is reduced. In contrast, the release from the near-field of poorly-sorbed nuclides which are not solubility limited is governed by the release rate from the fuel, the diffusive mass transfer resistance of the buffer, rock matrix and fracture, the initial inventories and the nuclide half-lives. In the reference case, the maximum dose potential of nuclides emerging from the near-field occur for I-129 and was 3.2 x 10 -7 Sv per canister-year, assuming the flux to be discharged directly into the wall receptor biosphere. The parameters which have the most impact on the reference base results are high flow, wide aperture and poor chemistry (i.e. high solubility limits and low sorption distribution coefficients). The effects of combining extreme values of parameters does not give results which are in proportion to their effect when applied in isolation. In the worst case variant (early canister failure high flow, wide aperture and poor chemistry) the maximum dose potential is 1.0 x 10 -4 Sv per canister-year, compared with 8.9 x 10 -6 Sv in the high flow case, 4.5 x 10 -7 in the wide aperture case, 2.3 x 10 -6 in the poor chemistry case and 3.9 x 10 -6 in the early failure, wide aperture and high flow case. (au)

  13. Sustainable development benefits of clean development mechanism projects

    Olsen, Karen Holm; Fenhann, Jorgen

    2008-01-01

    The clean development mechanism (CDM) is part of the global carbon market developing rapidly in response to global warming. It has the twin objective to achieve sustainable development (SD) in host countries and assist Annex-1 countries in achieving their emission reduction targets in a cost-efficient manner. However, research has shown that trade-offs between the two objectives exist in favour of cost-efficient emission reductions and that left to the market forces, the CDM does not significantly contribute to sustainable development. The main argument of the paper is the need for an international standard for sustainability assessment-additional to national definitions-to counter weaknesses in the existing system of sustainability approval by designated national authorities in host countries. The article develops a new methodology, i.e. a taxonomy for sustainability assessment based on text analysis of the 744 project design documents (PDDs) submitted for validation by 3 May 2006. Through analysis of the SD benefits of all CDM projects at aggregated levels, the strengths and limitations of the taxonomy are explored. The main policy implication of the research is to propose the taxonomy as the basis of an international verification protocol for designated operational entities (DOEs) for reporting, monitoring and verifying that potential SD benefits described in the PDDs are actually realized

  14. Evolution of the GATE project: new results and developments

    Santin, G. [ESA-ESTEC, Keplerlaan 1, 2200 AG Noordwijk (Netherlands); Staelens, S. [ELIS Department, Ghent University, B-9000 Ghent (Belgium); Taschereau, R. [CRUMP Institute for Molecular Imaging, University of California Los Angeles, 700 Westwood Plaza A438, Los Angeles, CA 90095-1770 (United States); Descourt, P. [U650 INSERM, LaTIM, Brest (France); Schmidtlein, C.R. [Memorial Sloan-Kettering Cancer Center, New York, New York, US (United States); Simon, L. [Department of Radiation Oncology, Institut Curie, Paris (France); Visvikis, D. [U650 INSERM, LaTIM, Brest (France); Jan, S. [Service Hospitalier Frederic Joliot (SHFJ), CEA-Orsay, Orsay (France); Buvat, I. [U678 INSERM, CHU Pitie-Salpetriere, Paris (France)

    2007-10-15

    We present the status of the Geant4 Application for Emission Tomography (GATE) project, a Monte Carlo simulator for Single Photon Emission Computed Tomography (SPECT) and Positron annihilation Emission Tomography (PET). Its main features are reminded, including modelling of time dependent phenomena and versatile, user-friendly scripting interface. The focus of this manuscript will be on new developments introduced in the past 4 years. New results have been achieved in the fields of validation on real medical and research PET and SPECT systems, voxel geometries, digitisation, distributed computing and dosimetry.

  15. Evolution of the GATE project: new results and developments

    Santin, G.; Staelens, S.; Taschereau, R.; Descourt, P.; Schmidtlein, C.R.; Simon, L.; Visvikis, D.; Jan, S.; Buvat, I.

    2007-01-01

    We present the status of the Geant4 Application for Emission Tomography (GATE) project, a Monte Carlo simulator for Single Photon Emission Computed Tomography (SPECT) and Positron annihilation Emission Tomography (PET). Its main features are reminded, including modelling of time dependent phenomena and versatile, user-friendly scripting interface. The focus of this manuscript will be on new developments introduced in the past 4 years. New results have been achieved in the fields of validation on real medical and research PET and SPECT systems, voxel geometries, digitisation, distributed computing and dosimetry

  16. PROJECTS EDUCATION RESEARCH: PRACTICAL EXPERIENCED IN A SCHOOL IN / FIELD

    Rosenilde Nogueira Paniago

    2014-12-01

    Full Text Available This study discusses an investigation done with teachers of a public school, located on countryside, city of Água Boa, Mato Grosso, with a view to looking for new alternatives to the teaching practice on school, by means of using the collaborative realization of projects and researches as pedagogical alternatives. As qualitative approach, the investigation has developed by means of the study of benchmarks, that discuss the research on teaching formation, on teaching practice, education on/of the countryside and, of the projects’ realization of teaching and research with and by teachers. The work enabled to get closer relationship between school and community, to articulate the theoretical knowledge, studied on school, and the life of countryside students, showing the necessity of theoretico-methodological formation with collective engagement of teachers and public politics that propitiate the emergence of conditions to the new practices of teaching on school on/of the countryside by the bias of search.

  17. Strip reduction testing of lubricants developed during ENFORM project

    Gazvoda, S.; Andreasen, Jan Lasson; Olsson, David Dam

    Strip reduction testing of lubricants developed during ENFORM project. Experiments were conducted with the strip reduction test [1] in order to classify experimental lubricants, developed during concerned project. One reference lubricant was used during testing....

  18. Development of field-wide risk based remediation objectives for an aging oil field : Devon Canada Swan Hills Field

    Brewster, M.; North, C.; Leighton-Boyce, G. [WorleyParsons Komex, Calgary, AB (Canada); Moore, D. [Devon Canada Corp., Calgary, AB (Canada)

    2006-07-01

    The development of field-wide risk based remediation objectives for the aging Devon Canada Swan Hills oil field was examined along with the key components of the closure strategy. These included source removal to the extent practical, long term monitoring, and achievable risk-based remedial objectives that were appropriate to the remote boreal forest setting of the Swan Hills field. A two stage approach was presented. The first stage involved a field wide background framework which included defining areas of common physical and ecological setting and developing appropriate exposure scenarios. The second stage involved site-specific risk assessments which included adjusting for site-specific conditions and an early demonstration project to prove the concept. A GIS approach was used to identify areas of common physical and ecological setting including: physiography; surface water; land use; vegetation ecozones; surficial and bedrock geology; and water well use. Species lists were compiled for vegetation, terrestrial wildlife (mammals, birds, amphibians), and aquatic species (fish and invertebrates). Major contaminant sources, problem formulation, vegetation bioassays, invertebrate bioassays, black spruce emergence, and guideline development were other topics covered during the presentation. Last, a summary of progress was presented. A field-wide review and development of risk zones and site-specific risk assessment has been completed. A regulatory review is underway. tabs., figs.

  19. Vague project start makes project success of outsourced software development projects uncertain

    Savolainen, Paula

    2010-01-01

    peer-reviewed A definition of a project success includes at least three criteria: 1) meeting planning goals, 2) customer benefits, and 3) supplier benefits. This study aims to point out the importance of the definition of the project start, the project start date, and what work should be included in the project effort in order to ensure the supplier's benefits. The ambiguity of the project start risks the profitability of the project and therefore makes project success at least from suppli...

  20. IP FUNMIG: The European far-field project

    Kienzler, B.; Buckau, G.

    2007-01-01

    The fundamental processes of radionuclide migration (the FUNMIG) is the subject matter for the Integral Project in terms of the European Commission 6-th Frame Programme (the FP6). Within the frameworks of the Project one focuses on the processes of the hot radionuclide interaction with various rocks associated with the migration of the hot radionuclides from the deep underground storage. Paper describes the Project objectives, arrangement and implementation. One highlights the German involvement in the Project [ru

  1. Development of field navigation system; Field navigation system no kaihatsu

    Ibara, S; Minode, M; Nishioka, K [Daihatsu Motor Co. Ltd., Osaka (Japan)

    1995-04-20

    This paper describes the following matters on a field navigation system developed for the purpose of covering a field of several kilometer square. This system consists of a center system and a vehicle system, and the center system comprises a map information computer and a communication data controlling computer; since the accuracy for a vehicle position detected by a GPS is not sufficient, an attempt of increasing the accuracy of vehicle position detection is made by means of a hybrid system; the hybrid system uses a satellite navigation method of differential system in which the error components in the GPS are transmitted from the center, and also uses a self-contained navigation method which performs an auxiliary function when the accuracy in the GPS has dropped; corrected GPS values, emergency messages to all of the vehicles and data of each vehicle position are communicated by wireless transmission in two ways between the center and vehicles; and accommodation of the map data adopted a system that can respond quickly to any change in roads and facilities. 3 refs., 13 figs., 1 tab.

  2. A role for NGOs in international renewable energy project development

    Bartholf, T.R.

    1997-12-01

    An NGO is an international term for non-government organizations, often it is used in connection with non-profit, community-based and/or voluntary business activities. To be successful in supporting energy projects, these organizations generally exhibit certain characteristics: they are familiar with the end-use requirements; they are typically neutral to the technology; they emphasize training; they do not carry a large bureacratic structure, at home or in the field; they typically can adapt to do numerous functions; they can often attract other support. The author discusses several examples of such organizations who have been highly successful. The author sees a continuing role for such groups in developing renewable energy sources in the rural setting to include: continued development of new activity in rural areas; development of institutional framework for future market activity; an increased role in managing international development activities; more direct involvement with for-profit technical and financial organizations.

  3. Oil, gas field growth projections: Wishful thinking or reality?

    Attanasi, E.D.; Mast, R.F.; Root, D.H.

    1999-01-01

    The observed `field growth' for the period from 1992 through 1996 with the US Geological Survey's (USGS) predicted field growth for the same period are compared. Known field recovery of field size is defined as the sum of past cumulative field production and the field's proved reserves. Proved reserves are estimated quantities of hydrocarbons which geologic and engineering data demonstrate with reasonable certainty to recoverable from known fields under existing economic and operating conditions. Proved reserve estimates calculated with this definition are typically conservative. The modeling approach used by the USGS to characterize `field growth phenomena' is statistical rather that geologic in nature.

  4. ECO2, Emissions Trading Services, development project

    Ruokonen, A.

    2006-01-01

    Emissions Trading started within EU at the beginning of 2005. It caused substantial changes to the business environment of energy companies and energy intensive industry. The planning of Emissions Trading is a complicated process and companies will need consulting, IT systems and other services. Emissions Trading introduces a new factor of production emission allowances, which are tradable commodities. In future, Emissions Trading emissions, emission allowances and the prices of emission allowances have to be considered during the fuel purchasing and the energy production planning. And the best possible knowledge of the own emissions balance and market situation has a monetary value when trading emission allowances. Allocation of emission allowances has done in each country according to National Allocation Plan (NAP), accepted by EU. Finland itself and thus also the Finnish companies will be net buyers of emission allowances in long run. That means commonly that the Finnish companies have to buy more allowances meaning some extra costs to the companies. That's why it is very important to develop and provide to the companies an innovatory emissions planning, follow-up, management and reporting systems. With good emission balance management the extra costs of Emissions Trading will be as low as possible. In ECO2 project, Empower together with Power-Deriva, developed Expert services, Emissions Balance Management and Reporting services and Risk Management services for Emissions Trading and needed software and tools for these services. (orig.)

  5. Standard development at the Human Variome Project.

    Smith, Timothy D; Vihinen, Mauno

    2015-01-01

    The Human Variome Project (HVP) is a world organization working towards facilitating the collection, curation, interpretation and free and open sharing of genetic variation information. A key component of HVP activities is the development of standards and guidelines. HVP Standards are systems, procedures and technologies that the HVP Consortium has determined must be used by HVP-affiliated data sharing infrastructure and should be used by the broader community. HVP guidelines are considered to be beneficial for HVP affiliated data sharing infrastructure and the broader community to adopt. The HVP also maintains a process for assessing systems, processes and tools that implement HVP Standards and Guidelines. Recommended System Status is an accreditation process designed to encourage the adoption of HVP Standards and Guidelines. Here, we describe the HVP standards development process and discuss the accepted standards, guidelines and recommended systems as well as those under acceptance. Certain HVP Standards and Guidelines are already widely adopted by the community and there are committed users for the others. © The Author(s) 2015. Published by Oxford University Press.

  6. Small Hydropower Research and Development Technology Project

    Blackmore, Mo [Near Space Systems, Inc.

    2013-12-06

    The objective of this work was to investigate, develop, and validate the next generation of small hydroturbine generator designs that maximize the energy transfer from flowing water to electrical power generation. What resulted from this effort was the design of a new technology hydroturbine that Near Space Systems (NSS) has named the Star*Stream© Hydroturbine. Using a design that eliminates nearly all of the shortfalls of conventional hydroturbines, the Star*Stream© Hydroturbine employs a new mechanical-to-electrical energy transfer hydro design that operates without lubrication of any kind, and does not introduce foreign chemicals or particulate matter from oil or drive shaft seal degradation into the hydro ecology. In its unique configuration, the Star*Stream© Hydroturbine is nearly environmentally inert, without the negative aspects caused by interrupting the ecological continuity, i.e., disruptions to sedimentation, water quality, habitat changes, human displacement, fish migration, etc., - while it ensures dramatically reduced timeframes to project completion. While a remarkable reduction in LCOE resulting from application of the Star*Stream© Hydroturbine technology has been the core achievement of the this effort, there have been numerous technological breakthroughs from the development effort.

  7. Project development and commercialisation of on-line analysis systems

    Watt, J.S.

    2000-01-01

    A project team first in the Australian Atomic Energy Commission (AAEC) and since 1982 in CSIRO has developed many on-line analysis systems for the mineral and energy industries. The development of these projects, usually lasting 7-10 years, has followed a common pattern of laboratory R and D, field trials, commercialisation and technology transfer. This successful pattern is illustrated using examples of the development of systems for the on-line analysis of mineral slurries, for determination of the ash content of coal on conveyors, and for determination of the flow rates of oil, water and gas in pipelines. The first two systems, licensed to Australian companies, are used world-wide. They are now the market leaders for radioisotope gauges in their application field. The third, the multiphase flow meter, was licensed in 1997 to an international company. This meter has even greater potential than the other two systems for economic benefit from its use and for numbers of installations. (author)

  8. System specifications for the fiscal 1995 NEDO wind power development field test project. Fukayama area, Nagashima-aza, Hiraizumi-cho, Nishiiwai-gun, Iwate Prefecture; 1995 nendo NEDO furyoku kaihatsu field test jigyo system sekkeisho. Iwateken Nishiiwaigun Hiraizumicho Nagashima aza Fukayama chinai

    NONE

    1996-07-01

    This is system specifications for the wind power development field test project (NEDO). The system was designed setting the annual mean wind speed at 6m/s and the annual occurrence probability of wind speed of 4-6m/s at 12% or more. Considering the result of the high frequency power disturbance survey, the mountainside toward 70m west of the top of the Otowayama was planned for a site for the construction. Only one wind turbine is to be installed since the cost of land formation for the mountainside site becomes higher because of the distances between wind turbines required in the case of installing more than one wind turbine. The system interconnects with the Hiraizumi substation near by. The mean power generation amount per year by size of wind turbine was supposed to be 754, 1230, and 1467 MWh for 300, 500, and 600 kW classes, respectively. The budget raisable is 200 million yen, and operating expenses are 146, 203, and 228 million yen for each class mentioned above. The 500-600 kW class is high in economical efficiency and profitable now and in future. In the light of the license of chief electric engineer requested for the 600 kW class, selected was Mitsubishi Heavy Industries` MWT-500 Up-Wind type. Its specifications are: 3 GFRP blades, 32 rpm, 38m rotor diameter, 38m tower height, pitch control, and 490 kW. 49 figs., 53 tabs.

  9. Security Risk Assessment in Software Development Projects

    Svendsen, Heidi

    2017-01-01

    Software security is increasing in importance, linearly with vulnerabilities caused by software flaws. It is not possible to spend all the project s resources on software security. To spend the resources given to security in an effective way, one should know what is most important to protect. By performing a risk analysis the project know which vulnerabilities they face. A risk analysis will prioritise the vulnerabilities, and when the vulnerabilities are prioritised the project know where th...

  10. International evaluation of Swedish research projects in the field of short rotation forestry for energy

    Dawson, W M [N.I. Horticulture and Plant Breeding Station, Armagh (Ireland); Isebrands, J [USDA Forest Service, North Central Forest Experiment Station, Rhinelander, WI (United States); Namkoong, G [Univ. of British Columbia, Vancouver, BC (Canada). Dept. of Forest Sciences; Tahvanainen, J [Univ. of Joensuu (Finland). Dept. of Biology

    1996-11-01

    The purpose of this evaluation was to inform NUTEK of the scientific quality of the research projects, as seen in an international context. The projects were therefore the main elements considered in the evaluation. The main basis of the evaluation was the scientific quality of the research and its relevance to NUTEK`s aims in the application of industrial research and development. The present report is based on the information contained in the written reports submitted by the grant holders, site visits and discussions between the grant holders and the Committee. The report first gives an overview and general recommendations concerning the overall programme in the field of Short Rotation Forestry for Energy. Thereafter, the 16 projects are evaluated separately

  11. Project Coordinator - Karianet | IDRC - International Development ...

    Primary Duties or Responsibilities. The specific responsibilities of the Project Coordinator are grouped into three categories: Knowledge Management, Research Management and Project Management. As Knowledge Manager, the program coordinator will play a lead role in: Introducing and using knowledge management ...

  12. Development of an Industrial Engineering Project

    Moreno, Lorenzo; Gonzalez, Evelio; Acosta, Leopoldo; Toledo, Jonay; Marichal, Nicolas; Hamilton, Alberto; Sigut, Marta; Mendez, J. Albino; Hernandez, Sergio; Torres, Santiago

    2005-01-01

    This paper presents a teaching strategy of the scheduling and developmental phase of an Industrial Engineering computer project. It is based on a real project which has been carried out by our department in collaboration with a local company. The classroom setting provides an environment where students can experience firsthand all phases of the…

  13. On e-Government Project Development in Balmeda

    Anagnostou, Miltiades E.; Lambrou, Maria A.

    An e-government project management and development scenario in a fictional country is described. Emphasis is given on how local culture undermines project quality. A detailed fictional project development scenario is presented. The interplay between different players, i.e. project developers, reviewers, and public services, is illustrated. While the rules of technology are the same everywhere, local adaptation due to socio-economic factors can bend them to the degree of making them ineffective.

  14. The essential value of projects in faculty development.

    Gusic, Maryellen E; Milner, Robert J; Tisdell, Elizabeth J; Taylor, Edward W; Quillen, David A; Thorndyke, Luanne E

    2010-09-01

    Projects--planned activities with specific goals and outcomes--have been used in faculty development programs to enhance participant learning and development. Projects have been employed most extensively in programs designed to develop faculty as educators. The authors review the literature and report the results of their 2008 study of the impact of projects within the Pennsylvania State University College of Medicine Junior Faculty Development Program, a comprehensive faculty development program. Using a mixed-methods approach, the products of project work, the academic productivity of program graduates, and the impact of projects on career development were analyzed. Faculty who achieved the most progress on their projects reported the highest number of academic products related to their project and the highest number of overall academic achievements. Faculty perceived that their project had three major effects on their professional development: production of a tangible outcome, development of a career focus, and development of relationships with mentors and peers. On the basis of these findings and a review of the literature, the authors conclude that projects are an essential element of a faculty development program. Projects provide a foundation for future academic success by enabling junior faculty to develop and hone knowledge and skills, identify a career focus and gain recognition within their community, generate scholarship, allocate time to academic work, and establish supportive relationships and collaborative networks. A list of best practices to successfully incorporate projects within faculty development programs is provided.

  15. Studies of field distortions in a time projection chamber for the International Linear Collider

    Zenker, Klaus

    2014-12-01

    The International Linear Collider (ILC) will allow to do precision measurements of Standard Model parameter and to search for new physics. The ILD detector concept, which is developed for the ILC, uses a Time Projection Chamber (TPC) as central tracking device. The momentum resolution goal for the ILD TPC is δ(1/p t ) ≅ 10 -4 (GeV/c) -1 at a magnetic field of B=3.5 T. Field distortions of the magnetic or electric field inside the sensitive volume of the TPC distort the momentum measurements. Therefore, one needs to keep them under control and correct them with high precision. In this thesis the main sources of field distortions in the TPC are identified and their effects are determined. Furthermore, possibilities to reduce the identified field distortions are presented. One known source of distortions of the electric field are ions, produced by the gas amplification in the TPC anode, that drift into the sensitive volume of the TPC. In the first part of this work the creation of these ions in Gas Electron Multiplier (GEM), which are used for the gas amplification, is studied. It will be shown that the resulting field distortions are not acceptable at the ILD TPC. By tuning the parameters of the gas amplification at the anode the field distortion can be reduced, which is shown in measurements and simulations. In addition measurements using a modified GEM show that it is possible to further reduce the field distortions with such a GEM. In the second part of this work field distortions arising at boundaries between individual readout modules are investigated using simulation studies. It will be shown in simulations, which are verified by measurement results, that these field distortions significantly influence the readout module performance. Based on the simulation results the GEM based readout module developed at DESY is optimised and the field distortions are reduced. These performance improvements could also be verified in measurements. Finally, a laser

  16. Methodology for economic evaluation of software development projects

    Witte, D.M.

    1990-01-01

    Many oil and gas exploration and production companies develop computer software in-house or with contract programmers to support their exploration activities. Software development projects compete for funding with exploration and development projects, though most companies lack valid comparison measures for the two types of projects. This paper presents a methodology of pro form a cash flow analysis for software development proposals intended for internal use. This methodology, based on estimates of development and support costs, exploration benefits, and probability of successful development and implementation, can be used to compare proposed software development projects directly with competing exploration proposals

  17. Status of the R+D programme in the field of the heat carrying and heat transfer components of the PNP project

    Mausbeck, H.; Jansing, W.

    1984-01-01

    The PNP Project (Project Nuclear Process Heat) is described. It covers the status of research and development in the field of heat exchange and heat exchanger components; concept of plant for coal gasification; description of large scale test facilities and its components; and the time schedule for the project development

  18. VISUAL ARTS AS THE FIELD OF KNOWLEDGE IN ARTE NA ESCOLA - DAC / UFSC PROJECT

    Richard Perassi Luiz de Sousa

    2011-07-01

    Full Text Available This paper presents and justifies the content worked in the extension course "The Visual Arts as a field of knowledge," which was sponsored by the Departamento Artístico Cultural – DAC/ UFSC, within the project "Arte na Escola". The course was directed at teachers of Art and also received other stakeholders in the study of Visual Arts, focusing on contemporary art. Art is justified as a field of knowledge in that, throughout its history, many have been developed knowledge, technologies and expertise applied to the development of artistic activities. In addition, each work of art represents a unique and innovative testimony of their time and offers a new set of knowledge, which broadens the cultural heritage of humanity. Finally, knowledge and artistic products are also applied in developing other areas of knowledge.

  19. Theoretical temperature fields for the Stripa heater project. Vol. 1

    Chan, T.; Cook, N.G.W.; Tsang, C.F.

    1978-09-01

    The report concerns thermal conduction calculations for the three in-situ heater experiments at Stripa which constitute part of the Swedish-American Cooperative Program on Radioactive Waste Storage in Mined Caverns. A semianalytic solution based on the Green's function method has been developed for an array of arbitrary time-dependent finite line heaters in a semi-infinite medium. This method as well as a three dimensional numerical model using IFD (Integrated Finite Difference) technique has been applied to model the field situations at Stripa. Comparison has demonstrated that the finite line source solution for the rock temperature is in excellent agreement with the numerical model solution as well as with a closed form finite cylinder source solution. It was found that maximum temperature rise in the rock within the two year experiment period will be 178 0 C for the 3.6 kW full-scale heater experiment, 345 0 C for the full-scale experiment with a 5 kW central heater and eight 0.72 kW peripheral heaters, and less than 200 0 C for the time-scaled experiment. The ring of eight peripheral heaters in the second full-scale experiment will provide a nominally uniform temperature rise within its perimeter a few weeks after turn-on. The high temperature zone is localized throughout the duration of all three experiments. Nevertheless, the effect of different spacings on the thermal interaction between adjacent radioactive waste canisters will be demonstrated by the time-scaled experiment. Detailed results are presented in the form of tables, temperature profiles and contour plots. Predicted temperatures have been stored in an on-site computer for real-time comparison with field data. 56 figures, 7 tables

  20. Mt. Apo geothermal project : a learning experience in sustainable development

    Ote, Leonardo M.; De Jesus, Agnes C.

    1997-01-01

    The Mt. Apo geothermal project, a critical component of the Philippine energy program met stiff opposition from 1988-1991. Seemingly unresolvable legal, environmental and cultural issues between the government developer, the Philippine National Oil Company-Energy Development Corporation (PNOC-EDC) and various affected sectors delayed the project for two years. The paper discusses the efforts undertaken by the developer to resolve these conflicts through a series of initiatives that transformed the project into a legally, environmentally and socially acceptable project. Lastly, the PNOC-EDC experience has evolved a new set of procedures for the environmental evaluation of development project in the Philippines. (author)

  1. EPRI's POWERCOACH trademark software development project

    Rost, S.; Leu, Kehshiou

    1993-01-01

    Today's complex bulk power market accounts for an estimated $35 billion in transactions a year, significantly more than a decade ago. With the increased levels of non-utility generation and changing strategies in the utility industry, it is anticipated that the trend toward rapid growth in the bulk power market will continue. This market has evolved from an ad hoc residual market to one that in some respects stands at par with the retail market in the plans of many utilities. The bulk power market is not based on the obligation to serve to the same extent as retail markets. Utility participation in this market is therefore purely voluntary. This freedom of action or inaction in the bulk power market actually renders corporate decision-making, investment related or operational, more complicated in many respects than in retail markets. Examples of the burgeoning uncertainties affecting the bulk power market include the rapid expansion of transactions undertaken through power pools, and the impact on utility planning and operations brought about by the abundance and price attractiveness of power available for flexible periods. These uncertainties present an ideal opportunity to employ state-of-the-art analytical models to facilitate the effective use of utility assets to foster the efficient functioning of the entire bulk power market. This paper will focus on the POWERCOACH methodology for short-term bulk power transaction analysis under conditions of uncertainty. In August 1992, UPMP began a seventeen month project to convert POWERCOACH from a methodology to a fully functional, commercial software package. UPMP is developing the POWERCOACH software with the extensive, direct involvement of thirty EPRI member utilities. A synopsis of POWERCOACH is presented

  2. Successful talent development in track and field

    Henriksen, K; Stambulova, N; Roessler, K K

    2010-01-01

    Track and field includes a number of high-intensity disciplines with many demanding practices and represents a motivational challenge for talented athletes aiming to make a successful transition to the senior elite level. Based on a holistic ecological approach, this study presents an analysis...... of a particular athletic talent development environment, the IFK Växjö track and field club, and examines key factors behind its successful history of creating top-level athletes. The research takes the form of a case study. Data were collected from multiple perspectives (in-depth interviews with administrators...... to elite athletes. A strong organizational culture, characterized by values of open co-operation, by a focus on performance process and by a whole-person approach, provided an important basis for the environment's success. The holistic ecological approach encourages practitioners to broaden their focus...

  3. Field development. Concept selection in deep water environment offshore Angola

    Guenot, A.; Berger, J.C.; Limet, N. [TotalFinaElf, la Defense 6, Rosa-Lirio Project Group, 92 - Courbevoie (France)

    2002-10-01

    The significant oil discoveries made at the end of the 90's in the deep water environment offshore the coast of Angola, has led to a considerable amount of development activities. The first field in production was the turnkey development of the Kuito field on the Block 14 operated by Chevron. More recently the Girassol field has been put successfully in production on the Block 17, operated by TotalFinaElf. Both developments are making use of sub-sea wells connected to a moored dedicated FPSO. On the western side of the Girassol field, several discoveries have been made. They are known as the Rosa Lirio pole, from the names of two of the main channels. Values for water depth are in the same range than on Girassol (1300- 1400 m). A project group has been established in 1999 to evaluate the development of these discoveries. The purpose of this paper is to present the conceptual work which as been carried out, and in particular to show that even if many different concepts have been evaluated, the final choice has been also to make use of sub-sea trees. (authors)

  4. The CGEM-IT of the BESIII experiment: project update and test results in magnetic field

    Mezzadri, G.

    2016-08-01

    The BESIII experiment is a multi-purpose detector operating on the electron- positron collider BEPCII in Beijing. Since 2008, the world's largest sample of J/ψ, ψ’ were collected. Due to increasing luminosity, the inner drift chamber is showing signs of aging. In 2014, an upgrade was proposed by the Italian collaboration based on the Cylindrical Gas Electron Multipliers (CGEM) technology, developed within the KLOE-II experiment, but with several new features and innovations. In this contribution, an overview of the project will be presented. Preliminary results of a beam test will be shown, with particular focus on the detector performance in magnetic field, with different configurations of electric field. A new readout mode, the µTPC readout, will also be described. The project has been recognized as a Significant Research Project within the Executive Programme for Scientific and Technological Cooperation between Italy and P.R.C for the years 2013-2015, and more recently has been selected as one of the project funded by the European Commission within the call H2020- MSCA-RISE-2014.

  5. Automating the management of software projects in a developing it ...

    Software project management is the control of the transformation of users' ... Model from The American Systems Corporation (ASC) was used for risk management. ... Multi-site development approach facilitates large projects by using simple ...

  6. All projects related to Ethiopia | IDRC - International Development ...

    A comparative study of child marriage and parenthood in Ethiopia, India, Peru and Zambia. Project. The aim of this project is to enhance the understanding of the complexities of ... Entrepreneurship and small business development in Ethiopia.

  7. Study on Risk Approaches in Software Development Projects

    Claudiu BRANDAS

    2012-01-01

    Full Text Available Risk approaches in project development led to the integration in the IT project management methodologies and software development of activities and processes of risk management. The diversity and the advanced level of the used technologies in IT projects with increasing com-plexity leads to an exponential diversification of risk factors.The purpose of this research is to identify the level of the risk approach in IT projects both at the IT project management and software development methodologies level and the level of the perception of IT project man-agers, IT managers and IT analysts in Romanian IT companies. Thus, we want to determine the correlation between the use of a project management or software development methodology and the overall level of risk perceived by the project managers using these methodologies.

  8. All projects related to | Page 118 | IDRC - International Development ...

    Strengthening the Evidence Base for Open Government in Developing Countries. Project. The Open Government Partnership (OGP) is an ... Project. Despite growing philanthropy in emerging economies, there are significant data gaps on amounts and sources. Topic: POLICY MAKING, REGULATIONS, HUMANITARIAN ...

  9. Characteristic Features of Innovation Project Management Aimed at University Human Resource Development

    Kalimullin, Aydar M.; Yungblud, Valery T.; Khodyreva, Elena A.

    2016-01-01

    The relevance of the studied issue is based on the need to develop theoretical approaches to project management at a higher educational institution taking into consideration the specifics of the subject area of the projects that ensure finding the "growth points" and addressing the long-term objectives of a university in the field of…

  10. An analysis of reliability for photovoltaic systems on the field test project for photovoltaic in Japan

    Oozeki, Takashi; Yamada, Takao; Kato, Kazuhiko [National Institute of Advanced Industrial Science and Technology (AIST), Research center for photovoltaic (RCPV), Tsukuba (Japan); Yamamoto, Taiji [New Energy and Industrial Technology Development Organization, MUZA Kawasaki Central Tower, Kanagawa (Japan)

    2008-07-01

    To develop a Photovoltaic (PV) module and cell efficiency are not only important, but also improving PV system performances is the significant technology. The long term reliability is one of the most important in PV systems' performances. In Japan, NEDO (New Energy and Industrial Technology Development Organization) has organized ''Field test (FT) project in Japan'' from FY 1992 up to now. The user of PV systems in the project cooperates for collecting monitoring data and reports the information of maintenance and some failures of PV systems for four years. In this paper, the failures and maintenance information are reported by using MTBF, MTTR, and so on. Moreover, the power conditioner is suspended by some protection or other reason - it is not failure, and the power conditioner can be restarted-which are obtained by PV system user's reports. (orig.)

  11. A policy for development of project management. Projektijuhtimise arendamise poliitika

    Arvi Kuura

    2013-01-01

    Full Text Available The share of temporary tasks and activities organised through projects and/or programmes is increasing in modern societies and also in businesses, non-profit and public organisations. To manage an increasing load of projects and programmes, the majority of organisations employ more skilled project management professionals and develop their project management capabilities. Against that background, most governments globally have not paid much attention to the development of project management. In other words, the project management capability (or maturity has not been a macro-level or policy concern. The article explores the importance of project management capabilities and the need for suitable policies, and outlines a policy for the development of project management

  12. Preliminary Phase Field Computational Model Development

    Li, Yulan [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hu, Shenyang Y. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Xu, Ke [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Suter, Jonathan D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); McCloy, John S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Bradley R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ramuhalli, Pradeep [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-12-15

    This interim report presents progress towards the development of meso-scale models of magnetic behavior that incorporate microstructural information. Modeling magnetic signatures in irradiated materials with complex microstructures (such as structural steels) is a significant challenge. The complexity is addressed incrementally, using the monocrystalline Fe (i.e., ferrite) film as model systems to develop and validate initial models, followed by polycrystalline Fe films, and by more complicated and representative alloys. In addition, the modeling incrementally addresses inclusion of other major phases (e.g., martensite, austenite), minor magnetic phases (e.g., carbides, FeCr precipitates), and minor nonmagnetic phases (e.g., Cu precipitates, voids). The focus of the magnetic modeling is on phase-field models. The models are based on the numerical solution to the Landau-Lifshitz-Gilbert equation. From the computational standpoint, phase-field modeling allows the simulation of large enough systems that relevant defect structures and their effects on functional properties like magnetism can be simulated. To date, two phase-field models have been generated in support of this work. First, a bulk iron model with periodic boundary conditions was generated as a proof-of-concept to investigate major loop effects of single versus polycrystalline bulk iron and effects of single non-magnetic defects. More recently, to support the experimental program herein using iron thin films, a new model was generated that uses finite boundary conditions representing surfaces and edges. This model has provided key insights into the domain structures observed in magnetic force microscopy (MFM) measurements. Simulation results for single crystal thin-film iron indicate the feasibility of the model for determining magnetic domain wall thickness and mobility in an externally applied field. Because the phase-field model dimensions are limited relative to the size of most specimens used in

  13. Strategy of Gurgyan-Deniz field development

    Javadova, Rena A.; Gumbatov, Bahruz Y.

    2002-01-01

    Full text : It is known that during long suspension of oil-gas production process due to some reasons of technical and geological character through their further involvement into development one can observe restoration of productive characteristics of layers. it can be associated with redistribution of hydrodynamic flows, stratal pressure, segregation and other. Analysis of conducted geological, commercial-geophysical, geochemical results allowed to say about significant amount of residual reserves on the field. According to the obtained data distribution of residual oil reserves along horizons is presented in this article. In 2001 well which operates by gas lift method and gives production 25 ton/per day. In order to increase temp of selection and of course ratio of oil recovery after restoration of grid one should provide application of new methods of development.

  14. Recommendations for Guidelines for Environment-Specific Magnetic-Field Measurements, Rapid Program Engineering Project #2

    Electric Research and Management, Inc.; IIT Research Institute; Magnetic Measurements; Survey Research Center, University of California; T. Dan Bracken, Inc.

    1997-03-11

    The purpose of this project was to document widely applicable methods for characterizing the magnetic fields in a given environment, recognizing the many sources co-existing within that space. The guidelines are designed to allow the reader to follow an efficient process to (1) plan the goals and requirements of a magnetic-field study, (2) develop a study structure and protocol, and (3) document and carry out the plan. These guidelines take the reader first through the process of developing a basic study strategy, then through planning and performing the data collection. Last, the critical factors of data management, analysis reporting, and quality assurance are discussed. The guidelines are structured to allow the researcher to develop a protocol that responds to specific site and project needs. The Research and Public Information Dissemination Program (RAPID) is based on exposure to magnetic fields and the potential health effects. Therefore, the most important focus for these magnetic-field measurement guidelines is relevance to exposure. The assumed objective of an environment-specific measurement is to characterize the environment (given a set of occupants and magnetic-field sources) so that information about the exposure of the occupants may be inferred. Ideally, the researcher seeks to obtain complete or "perfect" information about these magnetic fields, so that personal exposure might also be modeled perfectly. However, complete data collection is not feasible. In fact, it has been made more difficult as the research field has moved to expand the list of field parameters measured, increasing the cost and complexity of performing a measurement and analyzing the data. The guidelines address this issue by guiding the user to design a measurement protocol that will gather the most exposure-relevant information based on the locations of people in relation to the sources. We suggest that the "microenvironment" become the base unit of area in a study, with

  15. Sustainability, creativity and innovation in project management – Model development for assessing organizational performance through projects

    Szabó, Lajos

    2016-01-01

    Today a number of studies are published on how organizational strategy is developed and how organizations contribute to local and regional development through the realization of these strategies. There are also many articles dealing with the success of a project by identifying the criteria and the factors that influence them. This article introduces the project-oriented strategic planning process that reveals how projects contribute to local and regional development and demonstrates the relat...

  16. How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

    Kea, Howard

    2011-01-01

    The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

  17. Cloud microphysical characteristics versus temperature for three Canadian field projects

    I. Gultepe

    2002-11-01

    Full Text Available The purpose of this study is to better understand how cloud microphysical characteristics such as liquid water content (LWC and droplet number concentration (Nd change with temperature (T. The in situ observations were collected during three research projects including: the Radiation, Aerosol, and Cloud Experiment (RACE which took place over the Bay of Fundy and Central Ontario during August 1995, the First International Regional Arctic Cloud Experiment (FIRE.ACE which took place in the Arctic Ocean during April 1998, and the Alliance Icing Research Study (AIRS which took place in the Ontario region during the winter of 1999–2000. The RACE, FIRE.ACE, and AIRS projects represent summer mid-latitude clouds, Arctic clouds, and mid-latitude winter clouds, respectively. A LWC threshold of 0.005 g m-3 was used for this study. Similar to other studies, LWC was observed to decrease with decreasing T. The LWC-T relationship was similar for all projects, although the range of T conditions for each project was substantially different, and the variability of LWC within each project was considerable. Nd also decreased with decreasing T, and a parameterization for Nd versus T is suggested that may be useful for modeling studies.Key words. Atmospheric composition and structure (cloud physics and chemistry – Meteorology and atmospheric dynamics (climatology; general circulation

  18. Siyazama Entrepreneurial Development Project: Challenges of a ...

    Calls for global relevance and accountability are prevalent in private-public partnerships. Current community engagement projects in higher educational institutions reflect this focus. The academic partner can play a boundary spanning (bridge building) role in a community–university partnership. The university partner often ...

  19. Institutional strengthening in Egyptian development aid projects

    Walbeek, M.M.; Vlotman, W.F.

    2003-01-01

    In recent years Dutch aid projects have focused more on institutional strengthening. The overall impact of this type of aid has been limited. This paper explores possible reasons for this. In Egypt, it appeared to be difficult to make significant changes in the institutional setting. Main

  20. All projects related to | Page 131 | IDRC - International Development ...

    Any -, Development, Economics, Environment, Evaluation, Food and Agriculture, Gender ... This project seeks to provide capacity-building support to develop and ... Topic: Climate change, ENVIRONMENTAL MANAGEMENT, POLICY MAKING, ... Inclusive Development and Chinese Foreign Direct Investment in the Greater ...

  1. A Project Management Approach to Using Simulation for Cost Estimation on Large, Complex Software Development Projects

    Mizell, Carolyn; Malone, Linda

    2007-01-01

    It is very difficult for project managers to develop accurate cost and schedule estimates for large, complex software development projects. None of the approaches or tools available today can estimate the true cost of software with any high degree of accuracy early in a project. This paper provides an approach that utilizes a software development process simulation model that considers and conveys the level of uncertainty that exists when developing an initial estimate. A NASA project will be analyzed using simulation and data from the Software Engineering Laboratory to show the benefits of such an approach.

  2. Report on the survey of the project on the environmentally friendly type energy community field test. Separate volume - reference data. Investigative project for development and commercialization of recycle technology of waste edible oil; 2001 nendo kankyo chowa gata energy community field test jigyo chosa hokokusho. Hai shokuryo yu no recycle gijutsu kaihatsu to jitsuyoka no tameno chosa jigyo (Bessatsu - Sanko shiryo)

    NONE

    2002-06-01

    For the purpose of promoting the effective utilization of biomass resource, an investigative study was made on the development of recycle technology of waste edible oil. In the survey, the following were carried out and the results were summarized: promotion measures for biodiesel oil by the EU, promotion measures for biodiesel oil by other countries including Canada, promotion measures for biodiesel oil by the US's Department of Energy (DOC), actual results of the use of biodiesel oil in Kyoto City, reference data on biodiesel oil in Japan, and tackling toward the promotion of BDF in the Ministry of Agriculture, Forestry and Fisheries. As to the transportation use fuel in the EU in the coming 20 years, biofuel, natural gas and hydrogen seem to be selected. If measures are positively taken, biofuel is expected to be 2%, 6%, 7% and 8% in FY 2005, FY 2010, FY 2015 and FY 2020, respectively. Also, natural gas is expected to be 2% in FY 2010, 5% in FY 2015 and 10% in FY 2020, and hydrogen is expected to be 2% in FY 2015 and 5% in FY 2020. (NEDO)

  3. Report on the survey of the project on the environmentally friendly type energy community field test. Separate volume - reference data. Investigative project for development and commercialization of recycle technology of waste edible oil; 2001 nendo kankyo chowa gata energy community field test jigyo chosa hokokusho. Hai shokuryo yu no recycle gijutsu kaihatsu to jitsuyoka no tameno chosa jigyo (Bessatsu - Sanko shiryo)

    NONE

    2002-06-01

    For the purpose of promoting the effective utilization of biomass resource, an investigative study was made on the development of recycle technology of waste edible oil. In the survey, the following were carried out and the results were summarized: promotion measures for biodiesel oil by the EU, promotion measures for biodiesel oil by other countries including Canada, promotion measures for biodiesel oil by the US's Department of Energy (DOC), actual results of the use of biodiesel oil in Kyoto City, reference data on biodiesel oil in Japan, and tackling toward the promotion of BDF in the Ministry of Agriculture, Forestry and Fisheries. As to the transportation use fuel in the EU in the coming 20 years, biofuel, natural gas and hydrogen seem to be selected. If measures are positively taken, biofuel is expected to be 2%, 6%, 7% and 8% in FY 2005, FY 2010, FY 2015 and FY 2020, respectively. Also, natural gas is expected to be 2% in FY 2010, 5% in FY 2015 and 10% in FY 2020, and hydrogen is expected to be 2% in FY 2015 and 5% in FY 2020. (NEDO)

  4. Impact of National Fadama Development Project II on Rice farmers ...

    ... examined the impact of National Fadama Development Project II on the profitability of rice farmers and assessed the extent to which the various innovations disseminated by the project were adopted by the rice farmer beneficiaries. The project which had all operating expenses cofinanced by the various key stakeholders ...

  5. All projects related to | Page 165 | IDRC - International Development ...

    Improving Knowledge Management and Utilization of Research Results in Ecohealth Projects. Project. This study brings together lead investigators from 11 past and ongoing Ecohealth projects across Latin America who are interested in achieving better development outcomes guided by research results. End Date: August ...

  6. Phased project planning and development in anticipation of operational programs

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

  7. All projects related to | Page 535 | IDRC - International Development ...

    Aligning the National S&T Policy with the National Sustainable Development ... Project. Sri Lanka does not have an official science and technology (S&T) policy. ... Project. This action research project will study innovation in service delivery by local ... Topic: SOLID WASTES, WASTE MANAGEMENT, WASTE DISPOSAL.

  8. All projects related to | Page 31 | IDRC - International Development ...

    ... Miscellaneous, Natural Resources, Science and Technology, Social Policy. Project ... Agricultural water innovations in the tropics – AgWIT. Project. This project seeks to contribute to agricultural resilience to climate change in Costa Rica and Brazil by developing more sustainable soil and water management strategies.

  9. Project Finance and Projects in the Energy Sector in Developing Countries

    ERMELA KRIPA; HALIT XHAFA

    2013-01-01

    The purpose of this study is to show the importance of using project finance in infrastructure investments in developing countries. The paper will be focused only on one infrastructure sector, which is energy. Structurally, power project finance has involved largely buildown-transfer (BOT) project structures and long-term contracts. The projects largely reflect a rational allocation of risks among public and private participants. Private sponsors and lenders generally assume risks for complet...

  10. A Quantitative Study of Global Software Development Teams, Requirements, and Software Projects

    Parker, Linda L.

    2016-01-01

    The study explored the relationship between global software development teams, effective software requirements, and stakeholders' perception of successful software development projects within the field of information technology management. It examined the critical relationship between Global Software Development (GSD) teams creating effective…

  11. Application of alternative dispute resolution in the field of construction projects

    Yaskova, Natalia; Zaitseva, Larisa

    2017-10-01

    The article deals with the features of the Russian Federation legal system that do not allow to fully bring into effect the potential of the out-of-court dispute resolution due to the specific nature of contracts and subject composition of legal relations, especially in the field of construction projects. Examples of these methods are analyzed on the basis of the experience of foreign countries, suggestions for their development are stated, and types of disputes are studied, within which abuse of rights in contractual obligations is possible.

  12. Projected oriented organizations as development of enterprise management methods

    S.I. Pavlova

    2016-12-01

    Full Text Available Dynamic external environment, significant shortage of product life cycle, increase of product technological difficulty, extension of innovative knowledge motivates managers to look for and use in their activities keys that will provide constant, stable development of organizational structures. The methodology of project enterprise management meets the requirements of «preservation through development». The articles researches the integration of methods and procedures of project management into the enterprise management system. Project management philosophy is the efficient way of existence in the competitive environment and the means for internal development of a company. The author conducts an analysis, determines the essence and peculiarities of a project-oriented enterprise, performs comparing characteristics of functional and project management, describes the stages of gradual transformation of an enterprise organizational structure into a project-oriented one. It is defined that a project-oriented enterprise is that one which functions on the base of innovative development and are scientific, creative and widely use the project activity as the means of a steady development. The article describes internal and external instruments of project management, base knowledge systems on project management and possibilities of enterprises on audit of state of system project management in an enterprise according to the IPMA certification program on the territory of Ukraine.

  13. Development of high field superconducting Tokamak 'TRIAM-1M'

    Ito, Satoshi; Suzuki, Takao; Suzuki, Shohei; Nishi, Masatsugu; Kawasaki, Takahide.

    1984-01-01

    The tokamak nuclear fusion apparatus ''TRIAM-1M'' which is constructed in the Research Institute for Applied Mechanics, Kyushu University, has a number of distinctive features as compared with other tokamak projects, that is, the toroidal field coils are made of superconductors for the first time in Japan, and the apparatus is small and has strong magnetic field. Hitachi Ltd. designed and has forwarded the manufacture of the TRIAM-1M. In this paper, the total constitution of the apparatus and the design and manufacture of the plasma vacuum vessel, superconducting toroidal coils and others are reported. The objectives of research are the containment of strong field tokamak plasma and the establishment of the law of proportion, the development of turbulent flow heating method, the adoption of mixed wave current driving method and the practical use of Nb 3 Sn superconducting coils. The apparatus is composed of the vacuum vessel containing plasma, toroidal field coils, poloidal field coils, current transformer coils and turbulent flow heating coils for plasma heating, heat insulating vacuum vessel and supporting structures. The evacuating facility, helium liquefying refrigerator and cooling water facility are installed around the main body. (Kako, I.)

  14. General projective relativity and the vector-tensor gravitational field

    Arcidiacono, G.

    1986-01-01

    In the general projective relativity, the induced 4-dimensional metric is symmetric in three cases, and we obtain the vector-tensor, the scalar-tensor, and the scalar-vector-tensor theories of gravitation. In this work we examine the vector-tensor theory, similar to the Veblen's theory, but with a different physical interpretation

  15. US heat pump research and development projects, 1976-1986

    Zimmerman, K.H.

    1987-04-01

    This document, which is an updated version of US Heat Pump Research and Development Projects, published in August 1982 by the US Department of Energy, is a compilation of one-page summaries and publication and patent information for 233 individual research and development projects on heat pumps covering the years 1976 through 1986. The majority of the projects refer to heat pumps in space-conditioning applications. The document is intended to include information on all projects in the United States for which results are publicly available. Ten different indexes are included to aid the reader in locating specific projects.

  16. Development of a major hydroelectric project in the Pacific Rim

    Afshar, Y.; Kwiatkowski, R.W.

    1990-01-01

    Developing a major international energy project requires the assembly and close coordination of various factors. Some of the specific factors include identification of the client, specific project identification, establishing the need for the project, identifying the pros and cons of the project, technical and financial feasibility of the project, identifying sources of financing, identifying the competitions, studying possible teaming arrangements, involvement of local firms and representatives, and developing a strategy that will lead to the successful negotiation of the contract. This paper briefly addresses each of the factors

  17. MARKETING STRATEGIES IN THE DEVELOPMENT AND IMPLEMENTATION OF THE PROJECT

    Дмитрий Георгиевич БЕЗУГЛЫЙ

    2015-05-01

    Full Text Available The article is devoted to marketing in project management, as the scope of activities aimed at improving the quality characteristics of the project for its further effective market promotion in an increasingly competitive environment. Particular attention is paid to marketing strategies during the development and subsequent sale of the project to the investor. The problem of effective combination of marketing strategies and project management process is being solved.

  18. Information report published by the Commission for sustainable development and land planning on the finance bill project for 2017 (nr 4061). Nr 4131, Volume II: ecology, sustainable development and mobility, protection of the environment and risk prevention; Volume V: ecology, sustainable development and mobility, ecological transition; Volume X: research and higher education, research in fields related to sustainable development

    Lambert, Francois-Michel; Krabal, Jacques; Plisson, Philippe

    2016-01-01

    A first volume addresses the issue of risk prevention in terms of budgets, actions and strategic orientations for 2017 (a mix of budget increases and decreases, ambitious objectives and actions), and in terms of policy for a cleaner and safer environment (reduction of vulnerability to hydraulic and major natural risks, limitation of the exposure to technological and industrial risks, control of nuclear safety, protection of health against risks related to endocrine disrupters, bio-technologies or noise). A second volume addresses issues related to energy transition, firstly by discussing budgets awarded to energy and ecological transition (evolution of budgets awarded to program number 174, energy policy, economic and social management of the post-mining era, struggle against climate change, evolution of tax-related expenses, the issue of a sustainable financing of international and national commitments), and by discussing the consistency of the policy for a low carbon print system. A third volume addresses issues related to research in the fields related to sustainable development. It notably comments the global stability of budgets, and proposes an overview of involved public actors (CEA, CSTB, IFPEN, IFSTARR, INERIS and IRSN)

  19. Project Management in the Field of Innovative Technologies of Environmental Management

    Potasheva Galina

    2016-01-01

    Full Text Available The article deals with the application of project management in the field of innovative technologies of environmental management. This article examines the sustainability of integrated development environment, and society in the “three ones” concept, which covers all major aspects of development and global change: ecological, social, economic-based planning. But the transition from the national level to the practice of management in the real institutional environment revealed the unresolved systemic issues such as: economic development is considered at the national level; the management of social processes is in the area of responsibility of regions; environmental issues are concentrated at the local, municipal level. To solve this problem, this article discusses the design aspects of environmental management. So in designing the required high degree of understanding of interdependencies and patterns of organizing itself independently of the system that explains the differences between technical and social design. Technical design relies on mechanistic management, while social planning is understood as a system or organic project management. Hence it is safe to state the fact that project management in the environmental management of the country is concentrated in specific design, planning, technical and management solutions, as well as in the creation interested in these effects in all spheres and strata of society.

  20. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  1. Development of the Qattara Project, Egypt

    1978-01-01

    The River Nile, as a huge source of cheap hydroelectric energy, was fully exploited in Egypt upstream of Aswan in 1968 by the construction of the famous Aswan and High Dam Hydroelectric Complex. The growth of demand for electrical power is such that an additional large source of energy is required. The Qattara Project would offer not only an ideal source of low cost power production, but a vital boost for Egypt's national economy. The fundamental idea of the scheme is to channel Mediterranean Sea water into the Qattara Depression, using the difference in levels to produce hydroelectric power. The rate of discharge of sea water into the depression should be equivalent to the rate of evaporation from the lake surface. This situation will arise ten years after starting to fill the lake, when the water has reached a level of 60 m below sea level. The possibility of using PNE to excavate a Mediterranean Sea - Qattara Depression canal was first postulated by the Egyptian Atomic Energy Establishment in 1971. In 1973 a pre-feasibility study was prepared, based on preliminary site investigations performed during the period 1964-1965, namely geological and cartographic surveys, as well as on comparative economic evaluation of various solutions. The study showed clearly that the project including both base-load and peak-load hydroelectric power stations and using nuclear excavation of a canal between the sea and the depression offers a competitive solution for cheap power production. A subsequent feasibility study, which was started in 1975, investigates alternative ways of constructing the canal/tunnel system, using conventional tunnelling and PNE. For the nuclear solution, two cases are considered, one using unlimited yields and another with 150 kt maximum yield. A preliminary assessment of the effects of the explosion and costs of the nuclear component of the project are given. (author)

  2. Integrating HCI Specialists into Open Source Software Development Projects

    Hedberg, Henrik; Iivari, Netta

    Typical open source software (OSS) development projects are organized around technically talented developers, whose communication is based on technical aspects and source code. Decision-making power is gained through proven competence and activity in the project, and non-technical end-user opinions are too many times neglected. In addition, also human-computer interaction (HCI) specialists have encountered difficulties in trying to participate in OSS projects, because there seems to be no clear authority and responsibility for them. In this paper, based on HCI and OSS literature, we introduce an extended OSS development project organization model that adds a new level of communication and roles for attending human aspects of software. The proposed model makes the existence of HCI specialists visible in the projects, and promotes interaction between developers and the HCI specialists in the course of a project.

  3. Project and Partnership Officer | IDRC - International Development ...

    Job Summary Within the Partnership and Business Development Division led by ... Collaborates in developing and writing proposals for donors;; Participates in ... contracts and grant letters, materiel purchases, travel arrangements, analysis of ...

  4. Growth and project finance in the least developed countries

    Lisbeth F. la Cour; Jennifer Müller

    2014-01-01

    This article examines the effects of project finance on economic growth in the least developed countries (LDC). Inspired by the neoclassical growth model we set up an econometric model to estimate the effects of project finance for a sample consisting of 38 of the least developed countries using data from the period 1994-2007. The results of our study suggest, that project finance has a significant positive effect on economic growth and therefore constitute an important source of ...

  5. Aurora Borealis. Project Cycle Management in Regional Development

    Andra Aldea-Partanen; Heimo Keränen; Susanna Nevalainen

    2003-01-01

    This paper aims to analyse Project Cycle Management approach in the context of regional development. The theoretical framework covers contemporary concepts typical for regional development and specific project/programme management tools. The comparative approach is used to take into account the two versions of Project Cycle Management presented by European Commission among evaluation methods and instruments, in 1993 and 2001. A practical application is drawn using mid-term evaluation of Baren...

  6. Energy research and development projects in the Nordic countries. Directory 1987

    Anon.

    1988-01-01

    This is the fifth directory of research, development and demonstration projects in the Nordic countries within the field of energy. The directory includes projects running in 1987. 2378 projects are described, all of them financed through special public funds (i.e. external funding). The energy research organisation in each Nordic country is briefly reviewed in the appendixes, and a list of relevant newsletters are given. The directory is published at the request of the Nordic Council of Ministers and a special Energy Research Committee set up by the Nordic energy ministers in order to coordinate and promote Nordic information sharing in the energy field. (author)

  7. Energy research and development projects in the Nordic countries. Directory 1986. Energiforskningsprojekter i Norden. Katalog 1986

    1987-01-01

    This is the fourth directory of research, development and demonstration projects in the Nordic countries within the field of energy. The 1986 directory includes projects running in 1986. 2172 projects are described and all of them are financed through special public funds (i.e. external funding). The energy research organisation in each Nordic country is briefly reviewed in the appendixes, and a list of relevant newsletters are given. The directory is published at the request if the Nordic Council of Ministers and a special Energy Reseach Committee set up by the Nordic energy ministers in order to coordinate and promote Nordic information sharing in the energy field. (author)

  8. Energy research and development projects in the Nordic countries. Directory 1985. Energiforskningsprojekter i Norden. Katalog 1985

    1985-01-01

    This is the third directory of research, development and demonstration projects in the Nordic countries within the field of energy. The 1985 directory includes projects running in 1985. 1757 projects are described and all of them are financed through special public funds (i.e. external funding). The directory is published at the request of the Nordic Council of Ministers and a special Energy Research Committee set up by the Nordic energy ministers in order to coordinate and promote Nordic information sharing in the energy field. (author)

  9. Risk Management for New Product Development Projects in Food Industry

    Porananond, D.

    2014-07-01

    Full Text Available Project risk management provides a guideline for decision making in new product development (NPD projects, reducing uncertainty and increasing success rate. However, the acceptance of formal risk management applications in industry, especially for NPD projects is still in question. A study of a food conglomerate in Thailand found that only 9% of NPD projects used a systematic approach for managing risk. 61% of the projects realised the importance of risk management, while the remaining 30% did not involve risk management at all. This study aims to develop a risk management model for NPD projects in the food industry. The first section of this paper reviews the literature on risk management theory, including international standards for risk and project management (ISO31000 and ISO21500, publications for the Project Management Body of Knowledge (PMBOK, by a professional organisation the Project Management Institute (PMI, and also academic research. 182 academic papers, published between January 2002 and August 2012 were selected. The second part interviews conducted with eight NPD experts from five of the major food manufacturers in Thailand to examine their risk management practices and problems. Conclusions are made on five topics : classification of research method, project type and industrial segment, distribution of articles by region, tools & techniques for risk management and risk factors in projects. Specific requirements of risk management for NPD projects in the food industry are identified. A risk management model and the concept of risk management applications for the food industry are proposed.

  10. Field Guide to Layered Rocks. Earth Science Curriculum Project Pamphlet Series PS-3.

    Freeman, Tom

    Presented is the study of sequences of rock layers as the basis for historical geology. Also considered is the influence of rock layers on the appearance of the landscape. Specific relevant laws of geology are presented. Preparation for a field trip is discussed. An example field trip is discussed and field techniques and projects are reviewed.…

  11. ICT developments in mart industry field labs

    Stolwijk, C.C.M.; Punter, L.M.

    2017-01-01

    This report is intended as a contribution to the OECD project called Next Production Revolution on behalf of the Netherlands. The Next Production Revolution exams the impacts and policy implications of emerging production technologies. The focus of the Next Production Revolution project is on

  12. Development of the field of structural physiology

    FUJIYOSHI, Yoshinori

    2015-01-01

    Electron crystallography is especially useful for studying the structure and function of membrane proteins — key molecules with important functions in neural and other cells. Electron crystallography is now an established technique for analyzing the structures of membrane proteins in lipid bilayers that closely simulate their natural biological environment. Utilizing cryo-electron microscopes with helium-cooled specimen stages that were developed through a personal motivation to understand the functions of neural systems from a structural point of view, the structures of membrane proteins can be analyzed at a higher than 3 Å resolution. This review covers four objectives. First, I introduce the new research field of structural physiology. Second, I recount some of the struggles involved in developing cryo-electron microscopes. Third, I review the structural and functional analyses of membrane proteins mainly by electron crystallography using cryo-electron microscopes. Finally, I discuss multifunctional channels named “adhennels” based on structures analyzed using electron and X-ray crystallography. PMID:26560835

  13. R+D project KEWA. Cooperative development of economically efficient applications for environment, traffic and neighbouring fields in new administrative structures - phase II 2006/07; F+E-Vorhaben KEWA. Kooperative Entwicklung wirtschafticher Anwendungen fuer Umwelt, Verkehr und benachbarte Bereiche in neuen Verwaltungsstrukturen - Phase II 2006/07

    Mayer-Foell, R.; Keitel, A.; Geiger, W. (eds.)

    2007-07-15

    The project aims at efficient use of resources and joint research on and development of new solutions in the provision of environmental and traffic information for administrations and the general public (E-Government). KEWA is thus a successor to the R+D projects Globale Umweltsachdaten (GLOBUS, 1994-1999) and Anwendung JAVA-basierter Loesungen in den Bereichen Umwelt, Verkehr und Verwaltung (AJA, 2000-2004). Phase I of the project covered the period between 1 January 2005 and 30 June 2006. Central issues were the further development of portal technologies including metadata and document processing, the development of reporting systems and geodata processing, and applications for processing of measured data and dispersion calculations, in particular in the fields of water and radiation protection. Further issues were the combination of environmental and traffic information and elements of E-Government. Phase II of the project, from 1 July 2006 to 30 June 2007, is presented in this report. The work of the first phase was continued, and concepts and applications were developed for meeting the specifications made by IuK-Verbund Land/Kommkjnen, e.g. the 2006 outline concept of UIS BAden-Wuerttemberg, KONZEPTION RIPS 2006 for the Baden-Wuerttemberg regional information and planning system, the WIBAS 2006 concept for the Information system for water, nuisance control, soil, waste, and land pollution, suplporting activities, and E-services for the general public. Further subjects were, e.g., interstate cooperations, e.g. in the development of surface water information systems and environmental information networks, metadata catalogues and standardized service catalogues. An important issue for KEWA is the EU regulation on Infrastructure for Spatial Information in the European Community - INSPIRE. (orig.)

  14. Personalised nutritional powder for elderly developed in OPTIFEL European Project

    Monica TRIF

    2016-11-01

    Developing innovative food and services tailored to elderly populations is a new challenge for key players involved in food industry and catering. The population targeted by the OPTIFEL project is elderly cooking at home or making use of meal-on-wheels services for whom the project will develop food products adapted to their taste, habits, needs and constraints.

  15. The process of selecting technology development projects: a practical framework

    Herps, Joost M.J.; van Mal, Herman H.; Halman, Johannes I.M.; Martens, Jack H.M.; Borsboom, Ron H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  16. The process of selecting technology development projects : a practical framework

    Herps, J.M.J.; Mal, van H.H.; Halman, J.I.M.; Martens, J.H.M.; Borsboom, R.H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  17. The Empty Shops Project: Developing Rural Students' Sociological Insight

    Willis, Evan; Burns, Edgar

    2011-01-01

    An informal research project with high local relevance was developed for a first-year sociology course at an Australian rural university campus. The project developed students' sociological insight by challenging them to investigate "truths" about their own region, rather than immediately pushing them to comprehend new and different…

  18. Youths Attitude To Rural Development Projects In Ogba ...

    ... encourage youths to participate more in rural development projects. Also, training in the form of participatory seminars and workshops would help the youths to be more proactive. Keywords: Youths attitude, rural development projects, Ogba communities, Rivers State, Nigeria Global Approaches to Extension Practice Vol.

  19. Governance factors enabling knowledge transfer in interorganisational development projects

    Bosch-Sijtsema, Petra M.; Postma, Theo J. B. M.

    2010-01-01

    In this study we examine governance factors affecting knowledge transfer in interorganisational development projects. There is a gap in the literature indicating a need for more insights into processes of knowledge sharing and governance of interorganisational development projects. By using cases

  20. Mont Terri Project - Heater experiment : rock and bentonite thermo-hydro-mechanical (THM) processes in the near field of a thermal source for development of deep underground high level radioactive waste repositories

    Goebel, I.; Alheid, H.-J.; Kaufhold, St.; Naumann, M.; Pletsch, Th.; Plischke, I.; Schnier, H.; Schuster, K.; Sprado, K. [Bundesanstalt fuer Geowissenschaften und Rohstoffe (BGR), Hannover (Germany); Meyer, T.; Miehe, R.; Wieczorek, K. [Gesellschaft fuer Anlagen und Reaktorsicherheit mbH (GRS), Braunschweig (Germany); Mayor, J.C. [Empresa Nacional de Residuos Radioactivos SA (ENRESA), Madrid (Spain); Garcia-Sineriz, J.; Rey, M. [Asociacion para la Investigacion y Desarollo Industrial de los Recursos Naturales (AITEMIN), Madrid (Spain); Alonso, E.; Lloret, A.; Munoz, J.J. [Centre Internacional de Metodos Numerics en Ingenyeria (CIMNE), Barcelona (Spain); Weber, H. [National Cooperative for the Disposal of Radioactive Waste (Nagra), Wettingen (Switzerland); Ploetze, M. [Eidgenoessische Technische Hochschule Zuerich, Institut fuer Geotechnik, Zuerich (Switzerland); Klubertanz, G. [Colenco Power Engineering Ltd, Baden (Switzerland); Ammon, Ch. [Rothpletz Lienhard und Cie AG, Aarau (Switzerland); Graf, A.; Nussbaum, Ch.; Zingg, A. [Goetechnical Institute Ltd, Saint-Ursanne (Switzerland); Bossart, P. [Federal Office of Topography (swisstopo), Wabern (Switzerland); Buehler, Ch.; Kech, M.; Trick, Th. [Solexperts AG, Moenchaltorf (Switzerland); Emmerich, K. [ITC-WGT, Karlsruhe (Germany); Fernandez, A. M. [Ciemat, Madrid (Spain)

    2007-07-01

    the numerical models of the experiment. Moreover, numerical modelling of the near-field served as instrument for the prediction of experimental results and was hence useful for the steering of the experiment. The host rock was simulated in axisymmetric models as homogeneous and isotropic as well as in full 3D models as an anisotropic (approximately transverse isotropic) medium. The most salient features of temperature and pore pressure development could he modelled well by the axisymmetric as well as by the 3D models. The swelling of the bentonite was far less pronounced in reality than in the near-field model. Differences in the determination of the radial displacements in the HE borehole are probably caused by some problem with the sensors. The continuous monitoring in conjunction with the numerical modelling improves the understanding of THM processes in a bentonite barrier and its surrounding rock. For future heater experiments, preparation of the experimental set-up by numerical simulation might be a good idea. For the installation, the role of corrosion should not be underestimated.

  1. Development and implementation of a residency project advisory board.

    Dagam, Julie K; Iglar, Arlene; Kindsfater, Julie; Loeb, Al; Smith, Chad; Spexarth, Frank; Brierton, Dennis; Woller, Thomas

    2017-06-15

    The development and implementation of a residency project advisory board (RPAB) to manage multiple pharmacy residents' yearlong projects across several residency programs are described. Preceptor and resident feedback during our annual residency program review and strategic planning sessions suggested the implementation of a more-coordinated approach to the identification, selection, and oversight of all components of the residency project process. A panel of 7 department leaders actively engaged in residency training and performance improvement was formed to evaluate the residency project process and provide recommendations for change. These 7 individuals would eventually constitute the RPAB. The primary objective of the RPAB at Aurora Health Care is to provide oversight and a structured framework for the selection and execution of multiple residents' yearlong projects across all residency programs within our organization. Key roles of the RPAB include developing expectations, coordinating residency project ideas, and providing oversight and feedback. The development and implementation of the RPAB resulted in a significant overhaul of our entire yearlong resident project process. Trends toward success were realized after the first year of implementation, including consistent expectations, increased clarity and engagement in resident project ideas, and more projects meeting anticipated endpoints. The development and implementation of an RPAB have provided a framework to optimize the organization, progression, and outcomes of multiple pharmacy resident yearlong projects in all residency programs across our pharmacy enterprise. Copyright © 2017 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  2. Integrated Incident Management System (IIMS) web client application development, deployment and evaluation Staten Island (SI) demonstration project : final report.

    2015-09-27

    This evaluation report provides background on the development and findings. The aim of the UTRC project was to develop and : deploy Portable IIMS based on Smartphone web applications. Previously, traditional IIMS was deployed in the field vehicles : ...

  3. All projects related to | Page 129 | IDRC - International Development ...

    2017-10-17

    Project. Over the past two decades, the Greater Mekong Subregion has become increasingly integrated. End Date: October 17, 2017. Topic: FOREIGN INVESTMENT, ASIA, INDUSTRIAL DEVELOPMENT, ECONOMIC DEVELOPMENT. Region: Cambodia, China, Laos, Viet Nam, Thailand. Program: Employment and Growth.

  4. Financing Renewable Energy Projects in Developing Countries: A Critical Review

    Donastorg, A.; Renukappa, S.; Suresh, S.

    2017-08-01

    Access to clean and stable energy, meeting sustainable development goals, the fossil fuel dependency and depletion are some of the reasons that have impacted developing countries to transform the business as usual economy to a more sustainable economy. However, access and availability of finance is a major challenge for many developing countries. Financing renewable energy projects require access to significant resources, by multiple parties, at varying points in the project life cycles. This research aims to investigate sources and new trends in financing RE projects in developing countries. For this purpose, a detail and in-depth literature review have been conducted to explore the sources and trends of current RE financial investment and projects, to understand the gaps and limitations. This paper concludes that there are various internal and external sources of finance available for RE projects in developing countries.

  5. Critical success factors influencing the performance of development projects: An empirical study of Constituency Development Fund projects in Kenya

    Debadyuti Das; Christopher Ngacho

    2017-01-01

    The present work attempts to identify critical success factors (CSFs) influencing the performance of development projects based on their key performance indicators (KPIs). It has considered the case of Constituency Development Fund (CDF) projects constructed between 2003 and 2011 in Kenya and secured the perceptions of 175 respondents comprising clients, consultants and contractors involved in the implementation of CDF projects on 30 success variables. Findings reveal that individual items co...

  6. Financing of nuclear power projects in developing countries

    1991-06-01

    This document is a summary of the ''Topical Seminar on Financing of Nuclear Power Projects in Developing Countries, held in Jakarta between 4-7 September, 1990. The seminar presentations were divided into the following sessions: Keynote session (3 papers), Perspective of Nuclear and Fossil-fired Generation Costs (9 papers), Assessment of Problems and Constraints for the Financing of Large Power Projects, with particular Attention to Nuclear Power Projects (9 papers), Mechanisms for Financing Nuclear Power Projects in Developing Countries (11 papers). A separate abstract was prepared for each of these papers. Refs, figs, tabs and charts

  7. Status of the tandem FEL project development in Israel

    Benzvi, I.; Sokolowski, J.; Jerby, E.; Chomski, D.; Ruschin, S.

    1989-01-01

    The authors report the status of a collaborative research project development aimed toward construction of an IR FEL based on the EN tandem electrostatic accelerator of the Weizmann Institute of Science. A preliminary feasibility demonstration project yielded encouraging progress in three aspects: (1) Electron gun and accelerator conversion: A 50-kV 1-A electron gun injector was designed, built, tested, and assembled on the 6-MeV tandem accelerator which was previously converted and conditioned to operate as an electron accelerator in a positively charged HV terminal configuration. Contrary to the configuration of the only electrostatic accelerator FEL demonstrated so far, the electron gun and multistage depressed collector are connected to the ground, and the wiggler is placed in the HV terminal of the straight geometry tandem accelerator. This configuration promises to provide a high current high quality e-beam. (2) Electron-beam transport: The first installation of the electron optical beam recovery system yielded transport efficiency of 80%. Substantial improvement is expected with planned electron optics modifications. An effect, highly significant for realizing long pulse (quasi-cw) FEL operation, was observed experimentally. Due to the damping effect of the accelerator column capacitance network, the voltage terminal stayed constant for milliseconds even with poor beam transport efficiency. This points to the possibility of developing a long pulse FEL which may operate at a single longitudinal mode. (3) Wiggler development: A conventional 4.4-cm period SmCo planar wiggler was acquired and evaluated using a recently constructed floating wire magnetic field measurement setup

  8. PROBLEM-SOLVING METHODS OF PROJECT MANAGEMENT OF TECHNICAL DEVELOPMENT FOR AGRICULTURAL PRODUCERS

    Александр Васильевич СИДОРЧУК

    2015-05-01

    Full Text Available There have been proposed projects of technical development for agricultural producers. The conclusions about system features research projects that underlie the problem-solving methods of project management, have been made. There have been proved these projects (systems that can be simulated with the help of the research and formalization of many events. These events are components of the seven main factors of the agricultural production. The conclusion about the using the research method of the probabilistic nature events in the field of the crops projects with the help of the statistical and imitational models, have been developed. There have been considered the relation between the forecasting of functional marks of the technological systems and the estimation of their cost. And there have been found the optimum correspondence between parameters of the technical supply and planned features of the crops projects.

  9. Herding agent field application system development

    Buist, Ian; Belore, Randy [SL Ross Environmental Research (Canada)], email: ian@slross.com

    2011-07-01

    Chemical herding agents can be applied to deal with an oil slick. This study investigates the key system components of application systems for herding agents and shows how application systems can also be developed for operational herder usage in drift ice. These two application systems are respectively required for small boat and a helicopter operations. The factors, including the selection of flow rates, pressures and atomizing nozzle types, which give the appropriate herder droplet size distributions for small boat and aerial application systems were investigated in the initial stage of the study. In a later stage, on commercializing herders for in situ burning, further research is expected to deal with the many problems not tackled in the initial stage, such as the mounting of the nozzles, pumps and reservoirs on various aerial platforms and the provision of heating and insulation for cold-weather use. The paper presented the experiments and simulations that have been conducted as well as the basic design parameters for field application systems.

  10. Biomass Gasification Research and Development Project

    Ahring, Birgitte K. [Washington State Univ., Pullman, WA (United States)

    2014-07-22

    The overall objective of the BioChemCat project was to demonstrate the feasibility of using Advanced Wet Oxidation Steam-Explosion (AWEx) process to open and solubilize lignocellulosic biomass (LBM) coupled to an innovative mixed culture fermentation technology capable of producing a wide range of volatile fatty acids (VFAs) from all sugars present in LBM. The VFAs will then be separated and converted to hydrocarbon biofuel through catalytic upgrading. By continuously removing VFAs as they are produced (extractive fermentation), we were able to recover the VFAs while both eliminating the need for pH adjustment and increasing the fermentation productivity. The recovered VFAs were then esterified and upgraded to hydrocarbon fuels through a parallel series of hydrogenolysis/decarboxylation and dehydration reactions. We also demonstrated that a portion of the residual lignin fraction was solubilized and converted into VFAs, also improving the yields of VFAs. The remaining lignin fraction was then shown to be available (after dewatering and drying) for use as a lignin-enriched fuel pellet or as a feedstock for further processing.

  11. Next Generation Surveillance System (NGSS): Field Implementation & Associated Developments

    Hadfi, G.; John, M.; Liguori, C.; Moeslinger, M.; Murray, J.; Rocchi, S.

    2015-01-01

    The NGSS is the product of more than five years of development between the IAEA, other Inspectorates, Member State Support Programmes, and commercial vendors. The product of these efforts has now matured into the field implementation stage. This paper details the goals, achievements and challenges experienced during the implementation phase and associated developments of the project. NGSS procurement was subject to the IAEA's stringent procurement policies involving independent third party assessments to assure supplier reliability and competitive pricing controls. More than 1200 surveillance cameras currently installed in facilities worldwide will be replaced by NGSS within the next 4 to 5 years. Joint use procedures have been established taking advantage of the technical capabilities integrated within the design of the NGSS which allow for multiple inspectorates and States to securely and independently share and review data. Utilization of outdated facility infrastructure poses many challenges to implementation efforts; these were met with innovative technical solutions to take advantage of cost benefits allowed in its re-utilization. New partnerships were established with Member States, regulatory bodies and nuclear power plant operators for new nuclear facilities under construction, to address infrastructural requirements spanning the next half century. The utilization of the IAEA's well-established PKI infrastructure enhances data security features and usability with regard to data sharing, key management and joint use of the NGSS system data. Embedded inventory reporting capability aids electronic inventory verification of safeguards equipment, simplifying accountability, configuration control and troubleshooting of installed systems. Current developments ongoing within the project include the design of hardware and software components for use of the system in special applications (e.g., underwater and outdoor installations, mechanism to

  12. The profitability of photovoltaic projects in developing countries

    Covell, Philip W.; Hansen, Richard D. [Enersol Associates, Inc., (United states)

    1995-12-31

    This paper shows that it is possible to recover costs and profit from photovoltaic projects, even in relatively poor countries. It explains three basic financial arrangements for full cost recovery used in several developing countries for solar home and business systems: self financing; term financing through equipment vendors, banks and non-governmental organizations, and leasing. It also describes potential sources of cost recovery (besides the end-users), including CO{sub 2} offsets. Finally, it concludes that given the success of some projects, recent efforts toward market conditioning, and the effect of environmental concerns, there are good PV business opportunities for electric power utilities in developing countries. This is an adapted and abbreviated version of a paper entitled Full Cost Recovery in Photovoltaic Projects: Debunking the Myths about Equipment Subsidization. Much of the information has been drawn from the field experiences of Enersol Associates, Inc., a nonprofit organization specializing in PV project implementation; and SOLUZ, Inc., a Massachusetts based company affiliated with Industria Electrica Bella Vista, which operates a PV System Leasing Business in the Dominican Republic. Together, these organizations have facilitated the installation of over 5000 systems on a full cost recovery basis. [Espanol] Este articulo muestra que es posible recuperar los costos y sacar provecho de los proyectos fotovoltaicos, aun en paises relativamente pobres. Explica tres arreglos financieros basicos para la recuperacion total de los gastos usados en varios paises en desarrollo para sistemas solares domesticos y de negocios: autofinanciamiento, financiamiento por un periodo dado a traves de los vendedores de equipo, bancos y organizaciones no gubernamentales y renta. Tambien describe fuentes potenciales para la recuperacion de costos (ademas de los usuarios finales), incluyendo las compensaciones por CO{sub 2}. Finalmente concluye que dado el exito de

  13. The profitability of photovoltaic projects in developing countries

    Covell, Philip W; Hansen, Richard D [Enersol Associates, Inc., (United states)

    1996-12-31

    This paper shows that it is possible to recover costs and profit from photovoltaic projects, even in relatively poor countries. It explains three basic financial arrangements for full cost recovery used in several developing countries for solar home and business systems: self financing; term financing through equipment vendors, banks and non-governmental organizations, and leasing. It also describes potential sources of cost recovery (besides the end-users), including CO{sub 2} offsets. Finally, it concludes that given the success of some projects, recent efforts toward market conditioning, and the effect of environmental concerns, there are good PV business opportunities for electric power utilities in developing countries. This is an adapted and abbreviated version of a paper entitled Full Cost Recovery in Photovoltaic Projects: Debunking the Myths about Equipment Subsidization. Much of the information has been drawn from the field experiences of Enersol Associates, Inc., a nonprofit organization specializing in PV project implementation; and SOLUZ, Inc., a Massachusetts based company affiliated with Industria Electrica Bella Vista, which operates a PV System Leasing Business in the Dominican Republic. Together, these organizations have facilitated the installation of over 5000 systems on a full cost recovery basis. [Espanol] Este articulo muestra que es posible recuperar los costos y sacar provecho de los proyectos fotovoltaicos, aun en paises relativamente pobres. Explica tres arreglos financieros basicos para la recuperacion total de los gastos usados en varios paises en desarrollo para sistemas solares domesticos y de negocios: autofinanciamiento, financiamiento por un periodo dado a traves de los vendedores de equipo, bancos y organizaciones no gubernamentales y renta. Tambien describe fuentes potenciales para la recuperacion de costos (ademas de los usuarios finales), incluyendo las compensaciones por CO{sub 2}. Finalmente concluye que dado el exito de

  14. Texas LPG fuel cell development and demonstration project

    None, None

    2004-07-26

    The State Energy Conservation Office has executed its first Fuel Cell Project which was awarded under a Department of Energy competitive grant process. The Texas LPG Fuel Processor Development and Fuel Cell Demonstration Program is a broad-based public/private partnership led by the Texas State Energy Conservation Office (SECO). Partners include the Alternative Fuels Research and Education Division (AFRED) of the Railroad Commission of Texas; Plug Power, Inc., Latham, NY, UOP/HyRadix, Des Plaines, IL; Southwest Research Institute (SwRI), San Antonio, TX; the Texas Natural Resource Conservation Commission (TNRCC), and the Texas Department of Transportation (TxDOT). The team proposes to mount a development and demonstration program to field-test and evaluate markets for HyRadix's LPG fuel processor system integrated into Plug Power's residential-scale GenSys(TM) 5C (5 kW) PEM fuel cell system in a variety of building types and conditions of service. The program's primary goal is to develop, test, and install a prototype propane-fueled residential fuel cell power system supplied by Plug Power and HyRadix in Texas. The propane industry is currently funding development of an optimized propane fuel processor by project partner UOP/HyRadix through its national checkoff program, the Propane Education and Research Council (PERC). Following integration and independent verification of performance by Southwest Research Institute, Plug Power and HyRadix will produce a production-ready prototype unit for use in a field demonstration. The demonstration unit produced during this task will be delivered and installed at the Texas Department of Transportation's TransGuide headquarters in San Antonio, Texas. Simultaneously, the team will undertake a market study aimed at identifying and quantifying early-entry customers, technical and regulatory requirements, and other challenges and opportunities that need to be addressed in planning commercialization of the units

  15. Low Emittance Gun Project based on Field Emission

    Ganter, Romain; Dehler, M; Gobrecht, Jens; Gough, Chris; Ingold, Gerhard; Leemann, Simon C; Shing-Bruce-Li, Kevin; Paraliev, Martin; Pedrozzi, Marco; Raguin, Jean Yves; Rivkin, Leonid; Schlott, Volker; Sehr, Harald; Streun, Andreas; Wrulich, Albin F; Zelenika, Sasa

    2004-01-01

    The design of an electron gun capable of producing beam emittance one order of magnitude lower than current technology would reduce considerably the cost and size of a free electron laser emitting at 0.1nm. Field emitter arrays (FEAs) including a gate and a focusing layer are an attractive technology for such high brightness sources. Electrons are extracted from micrometric tips thanks to voltage pulses between gate and tips. The focusing layer should then reduce the initial divergence of each emitted beamlets. This FEA will be inserted in a high gradient diode configuration coupled with a radiofrequency structure. In the diode part very high electric field pulses (several hundreds of MV/m) will limit the degradation of emittance due to space charge effect. This first acceleration will be obtained with high voltage pulses (typically a megavolt in a few hundred of nanoseconds) synchronized with the low voltage pulses applied to the FEA (typically one hundred of volts in one nanosecond at frequency below kilohe...

  16. Radiobiology at GANIL: local project and others fields studied

    Anon.

    2001-01-01

    This article reviews the research that is led in the field of radiobiology using heavy ions at Ganil. Our first studies with heavy ions were mainly focused on chromosome rearrangements induced in irradiated human cells. We analyzed R-banded chromosome rearrangements in human lymphocytes irradiated with several ions having a wide range of linear energy transfer (LET). Damage increased with the fluence and LET but at the higher LET, damage decreased for fluences above 10 7 particles/cm 2 . Chromosome rearrangements of high complexity involve several breaks. DNA strand breaks are concentrated in localized areas and their complexity is greatly increased by high-LET radiations. Our study was mainly qualitative and we showed a clear shift and dispersion of comet distribution towards high tail moments when particle LET and fluence increased. The higher the LET, the greater the level of DNA breaks observed for the same fluence. Gamma rays were more effective in producing DNA breaks than all the ions, at least in the lower dose range. In addition to early damage, high-LET irradiation also induces delayed lesions, and genomic instability occurs after many generations in the progeny of irradiated cells. We observed delayed chromosome instability on human dermis fibroblasts exposed to heavy ions, neon, argon, and lead but not after gamma rays. Various fields of radiobiology are now explored by different research groups. One of the studies aims to detect locally multiple damage sites (LMDS) formed in DNA after exposure to heavy ions. (A.C.)

  17. EDF source term reduction project main outcomes and further developments

    Ranchoux, Gilles; Bonnefon, Julien; Benfarah, Moez; Wintergerst Matthieu; Gressier, Frederic; Leclercq, Stephanie

    2012-09-01

    The dose reduction is a strategic purpose for EDF in link with the stakes of, nuclear acceptability, respect of regulation and productivity gains. This consists not only in improving the reactor shutdown organization (time spent in control area, biological shielding,...) but also in improving the radiological state of the unit and the efficiency of the source term reduction operations. Since 2003, EDF has been running an innovative project called 'Source Term Reduction' federating the different EDF research and engineering centers in order to: - participate to the long term view about Radiological Protection issues (international feedback analyses), - develop contamination prediction tools (OSCAR software) suitable for the industrial needs (operating units and EPR design), - develop scientific models useful for the understanding of contamination mechanisms to support the strategic decision processes, - carry on with updating and analyzing of contamination measurements feedback in corrosion products (EMECC and CZT campaigns), - carry on with the operational support at short or middle term by optimizing startup and shutdown processes, pre-oxidation or and by improving purification efficiency or material characteristics. This paper will show in a first part the main 2011 results in occupational exposure (collective and individual dose, RCS index...). In a second part, an overview of the main EDF outcomes of the last 3 years in the field of source term reduction will be presented. Future developments extended to contamination issues in EDF NPPs will be also pointed out in this paper. (authors)

  18. The FAIR Project: Status and New Developments

    Schmitt, Lars

    2006-01-01

    Detailed planning and R and D for both, the accelerator and the experimental systems of the future international Facility for Antiproton and Ion Research (FAIR) is in progress on many fronts. It involves a wide range of activities, both at laboratories in partner countries participating in the preparatory activities as well as at GSI.This report summarizes the current situation, with emphasis on recent important developments. This includes new performance aspects of FAIR, in particular also the plans towards QCD spin physics with polarized anti-protons. An outlook on facility development and construction is given

  19. Three-Dimensional Velocity Field De-Noising using Modal Projection

    Frank, Sarah; Ameli, Siavash; Szeri, Andrew; Shadden, Shawn

    2017-11-01

    PCMRI and Doppler ultrasound are common modalities for imaging velocity fields inside the body (e.g. blood, air, etc) and PCMRI is increasingly being used for other fluid mechanics applications where optical imaging is difficult. This type of imaging is typically applied to internal flows, which are strongly influenced by domain geometry. While these technologies are evolving, it remains that measured data is noisy and boundary layers are poorly resolved. We have developed a boundary modal analysis method to de-noise 3D velocity fields such that the resulting field is divergence-free and satisfies no-slip/no-penetration boundary conditions. First, two sets of divergence-free modes are computed based on domain geometry. The first set accounts for flow through ``truncation boundaries'', and the second set of modes has no-slip/no-penetration conditions imposed on all boundaries. The modes are calculated by minimizing the velocity gradient throughout the domain while enforcing a divergence-free condition. The measured velocity field is then projected onto these modes using a least squares algorithm. This method is demonstrated on CFD simulations with artificial noise. Different degrees of noise and different numbers of modes are tested to reveal the capabilities of the approach. American Heart Association Award 17PRE33660202.

  20. Development of Risk Uncertainty Factors from Historical NASA Projects

    Amer, Tahani R.

    2011-01-01

    NASA is a good investment of federal funds and strives to provide the best value to the nation. NASA has consistently budgeted to unrealistic cost estimates, which are evident in the cost growth in many of its programs. In this investigation, NASA has been using available uncertainty factors from the Aerospace Corporation, Air Force, and Booz Allen Hamilton to develop projects risk posture. NASA has no insight into the developmental of these factors and, as demonstrated here, this can lead to unrealistic risks in many NASA Programs and projects (P/p). The primary contribution of this project is the development of NASA missions uncertainty factors, from actual historical NASA projects, to aid cost-estimating as well as for independent reviews which provide NASA senior management with information and analysis to determine the appropriate decision regarding P/p. In general terms, this research project advances programmatic analysis for NASA projects.

  1. Development of the Falea polymetallic uranium project

    Ring, R.; Freeman, P.

    2014-01-01

    The Falea uranium, silver, copper deposit is located in south western Mali, West Africa and is owned by Denison Mines Corp. The current resource estimate is approximately 45 million pounds of U_3O_8 [~17,300 t U] at an average grade of ~ 0.07% U_3O_8. [~0.06% U].The deposit also contains ~37 million Oz Ag and ~70,000 t Cu. The dominant uranium mineral is uraninite, copper is present mainly as chalcopyrite and silver mainly as argentite, and in its native form. Only 5% of the property has been explored to date, and all zones remain open. This paper reports the results of several stages of metallurgical investigations to support ongoing economic studies for the project. The polymetallic nature of the Falea deposit dictates that there are a range of flowsheet options. The ore contains both carbonate and sulphide mineralisations, which have potential impacts on acid and alkaline leaching, respectively. There is also the need to recover both silver and copper. Two primary flowsheet options were considered: 1) Acid leach of ore to recover uranium / flotation of leach residue to recover sulphide concentrate, treatment of concentrate for Cu and Ag recovery; 2) Flotation of ore / alkaline leaching of flotation tails to recover uranium and treatment of flotation concentrate for Cu and Ag recovery. A number of sub-options were considered for each flowsheet. Test work showed that high recoveries of copper and silver to flotation concentrate were obtained for both flotation of ore or acid leach residue. Uranium extraction was also > 90% for both acid and alkaline leaching. The preferred flowsheet was selected after trade-off studies by DRA. This paper presents an overview of the various flowsheet options considered, an outline of the preferred flowsheet, and the results and conclusions of on-going engineering and laboratory/pilot studies to refine the preferred flowsheet. (author)

  2. Achievement Motivation Development Project. Final Report.

    McClelland, Dave C.; Alschuler, Alfred S.

    Two efforts were made to develop achievement motivation in school children and to observe the effect of such training on their behavior in and out of school. These studies were undertaken because: (1) Achievement motivation might help children think more seriously about their work habits and career planning; (2) It might improve the grades of…

  3. Aquantis Ocean Current Turbine Development Project Report

    Fleming, Alex J.

    2014-08-23

    The Aquantis® Current Plane (“C-Plane”) technology developed by Dehlsen Associates, LLC (DA) and Aquantis, Inc. is an ocean current turbine designed to extract kinetic energy from ocean currents. The technology is capable of achieving competitively priced base-load, continuous, and reliable power generation from a source of renewable energy not before possible in this scale or form.

  4. Witness: The Movie. A Material Development Project.

    Conlon, Susan Henderson

    A teaching guide and series of exercises for high-intermediate or advanced English-as-a-Second-Language (ESL) instruction based on the movie "Witness" are presented. The materials are designed primarily to develop English listening and speaking skills and enhance awareness of American culture and the criminal justice system. The teaching…

  5. Field Monitoring of Experimental Hot Mix Asphalt Projects Placed in Massachusetts

    2017-06-30

    Since 2000, Massachusetts has been involved with numerous field trials of experimental hot mix asphalt mixtures. These experimental mixtures included several pilot projects using the Superpave mixture design methodology, utilization of warm mix aspha...

  6. The Unseen Face of E-Business Project Development

    Mesnita, Gabriela; Vasilica, Tiberiu

    2003-01-01

    The purpose of this paper is intent on identify and analyze the unseen factors of successful or failure of e-business project development. The IT managers must take into account both all costs involved in e-business development and all phases (analysis, design, testing, implementation, maintenance and operation) according to principle of project management for software/systems life cycle development. There are many solutions to exceed these factors of failure among could be counted outsourcin...

  7. Designing Project Management for Global Software Development

    Tjørnehøj, Gitte; B. Balogh, Maria; Iversen, Cathrine

    2014-01-01

    of distributed software teams, based on a practice study and informed by well-known theories. Our work pinpoints the difficulties of handling the vital informal processes in distributed collaboration that are so vulnerable because the distances risk detaining their growth and increasing their decay rate......Software development in distributed teams remains challenging despite rapid technical improvement in tools for communication and collaboration across distance. The challenges stem from geographical, temporal and sociocultural distance and manifest themselves in a variety of difficulties...

  8. Nursing Professional Development Organizational Value Demonstration Project.

    Harper, Mary G; Aucoin, Julia; Warren, Joan I

    2016-01-01

    A common question nursing professional development (NPD) practitioners ask is, "How many NPD practitioners should my organization have?" This study examined correlations among facility size and structure, NPD practitioner characteristics and time in service, and organizational outcomes. Organizations with a higher rate of NPD full-time equivalents per bed had higher patient satisfaction with nurses' communication and provision of discharge instruction on their HCAHPS (Hospital Consumer Assessment of Healthcare Provider and Systems) scores.

  9. So many developers, so many projects: toward a motivation-based theory of project selection

    van Osch, W.; Adelaar, T.; Pith, M.

    2011-01-01

    Studies into open source software (OSS) development projects have hitherto focused on the question of why people aremotivated to contribute to these projects, thereby assuming that motivational factors are the same across all types of OSSprojects. In this study we challenge this assumption by

  10. ANALYSIS OF THE DEVELOPMENT DIRECTIONS OF THE BANKING SECTOR THROUGH THE MANAGEMENT OF IT PROJECTS

    Віктор Володимирович МОРОЗОВ

    2017-03-01

    Full Text Available In this article, the causes and consequences of IT projects’ budgets reformatting in banking organizations are investigated. Analysis and parallels in approaches of choosing IT projects to be implemented in foreign and Ukrainian financial institutions are being conducted. This significantly affects not only the results of investigation and selection of IT projects but also on the development of such organizations in general. The analysis shows that on the background of global GDP decrease, banks around the world are increasing their IT investments, but investments in IT projects are heavily redistributed towards digital transformation. Nevertheless, IT projects are a major driver of banking business development, so their number is rapidly growing every day in the fields of big data analytics, virtualization and cloud computing, mobility, scoring, target marketing, IT infrastructure etc. The authors draw conclusions about trends in implementation of IT projects and their impact on the development of the banking business sector.

  11. [Strategy Development for International Cooperation in the Clinical Laboratory Field].

    Kudo, Yoshiko; Osawa, Susumu

    2015-10-01

    The strategy of international cooperation in the clinical laboratory field was analyzed to improve the quality of intervention by reviewing documents from international organizations and the Japanese government. Based on the world development agenda, the target of action for health has shifted from communicable diseases to non-communicable diseases (NCD). This emphasizes the importance of comprehensive clinical laboratories instead of disease-specific examinations in developing countries. To achieve this goal, the World Health Organization (WHO) has disseminated to the African and Asian regions the Laboratory Quality Management System (LQMS), which is based on the same principles of the International Organization of Standardization (ISO) 15189. To execute this strategy, international experts must have competence in project management, analyze information regarding the target country, and develop a strategy for management of the LQMS with an understanding of the technical aspects of laboratory work. However, there is no appropriate pre- and post-educational system of international health for Japanese international workers. Universities and academic organizations should cooperate with the government to establish a system of education for international workers. Objectives of this education system must include: (1) training for the organization and understanding of global health issues, (2) education of the principles regarding comprehensive management of clinical laboratories, and (3) understanding the LQMS which was employed based on WHO's initiative. Achievement of these objectives will help improve the quality of international cooperation in the clinical laboratory field.

  12. Financing arrangements for nuclear power projects in developing countries

    1993-01-01

    This reference book reviews the main features and problems or difficulties involved in the financing of nuclear power projects with special reference to developing countries. It provides basic information and advice to developing countries interested in nuclear power projects as part of their power sector planning. The book outlines the general characteristics of financing a nuclear power project and presents innovative approaches for power generation financing. It discusses the special conditions and requirements of nuclear power projects and their financing complexities. The focus is on the practical issues that need to be dealt with in order to successfully finance these power projects, as well as the constraints faced by most developing countries. Possible ways and means of dealing with these constraints are presented. 58 refs, figs and tabs

  13. DOE research and development and field facilities

    1979-06-01

    This report describes the roles of DOE's headquarters, field offices, major multiprogram laboratories, Energy Technology and Mining Operations Centers, and other government-owned, contractor-operated facilities which are located in all regions of the United States. It gives brief descriptions of resources, activities, and capabilities of each field facility (sections III through V). These represent a cumulative capital investment of $12 billion and involve a work force of approximately 12,000 government (field) employees and approximately 100,000 contractor employees.

  14. Use of a Laboratory Field Project in an Introductory Crop Science Course.

    Lane, Robert A.

    1986-01-01

    Assesses the benefits resulting from a laboratory field project and report for agricultural students in an introductory crop science course. Student responses to evaluation statements indicated that the project helped them identify crops, understand cultural and management practices, and recognize environmental influences that affect crop…

  15. New business opportunity: Green field project with new technology

    Seung Jae Lee

    2014-06-01

    Full Text Available Since 2009 of global financial crisis, shipbuilding industry has undergone hard times seriously. After such a long depression, the latest global shipping market index shows that the economic recovery of global shipbuilding market is underway. Especially, nations with enormous resources are going to increase their productivity or expanding their shipyards to accommodate a large amount of orders expected in the near future. However, few commercial projects have been carried out for the practical shipyard layout designs even though those can be good commercial opportunities for shipbuilding engineers. Shipbuilding starts with a shipyard construction with a large scale investment initially. Shipyard design and the equipment layout problem, which is directly linked to the productivity of ship production, is an important issue in the production planning of mass production of ships. In many cases, shipbuilding yard design has relied on the experience of the internal engineer, resulting in sporadic and poorly organized processes. Consequently, economic losses and the trial and error involved in such a design process are inevitable problems. The starting point of shipyard construction is to design a shipyard layout. Four kinds of engineering parts required for the shipyard layout design and construction. Those are civil engineering, building engineering, utility engineering and production layout engineering. Among these parts, production layout engineering is most important because its result is used as a foundation of the other engineering parts, and also, determines the shipyard capacity in the shipyard lifecycle. In this paper, the background of shipbuilding industry is explained in terms of engineering works for the recognition of the macro trend. Nextly, preliminary design methods and related case study is introduced briefly by referencing the previous research. Lastly, the designed work of layout design is validated using the computer simulation

  16. New business opportunity: Green field project with new technology

    Lee, Seung Jae; Woo, Jong Hun; Shin, Jong Gye

    2014-06-01

    Since 2009 of global financial crisis, shipbuilding industry has undergone hard times seriously. After such a long depression, the latest global shipping market index shows that the economic recovery of global shipbuilding market is underway. Especially, nations with enormous resources are going to increase their productivity or expanding their shipyards to accommodate a large amount of orders expected in the near future. However, few commercial projects have been carried out for the practical shipyard layout designs even though those can be good commercial opportunities for shipbuilding engineers. Shipbuilding starts with a shipyard construction with a large scale investment initially. Shipyard design and the equipment layout problem, which is directly linked to the productivity of ship production, is an important issue in the production planning of mass production of ships. In many cases, shipbuilding yard design has relied on the experience of the internal engineer, resulting in sporadic and poorly organized processes. Consequently, economic losses and the trial and error involved in such a design process are inevitable problems. The starting point of shipyard construction is to design a shipyard layout. Four kinds of engineering parts required for the shipyard layout design and construction. Those are civil engineering, building engineering, utility engineering and production layout engineering. Among these parts, production layout engineering is most important because its result is used as a foundation of the other engineering parts, and also, determines the shipyard capacity in the shipyard lifecycle. In this paper, the background of shipbuilding industry is explained in terms of engineering works for the recognition of the macro trend. Nextly, preliminary design methods and related case study is introduced briefly by referencing the previous research. Lastly, the designed work of layout design is validated using the computer simulation technology.

  17. European projects as Continuous Professional Development

    Lauridsen, Karen M.

    Recent years have seen an increased awareness of the need for Continuous Professional Development (CPD) of academic staff teaching international programmes to diverse student audiences. At the same time, many academic units are under pressure from the university leadership teams to demonstrate...... the impact it has had on partner representatives’ awareness of the key issues related to the teaching and learning in the multilingual and multicultural learning space. Moreover, it demonstrates to which extent they have changed their behavior as a result of what they, personally, have learned while working...

  18. Critical success factors influencing the performance of development projects: An empirical study of Constituency Development Fund projects in Kenya

    Debadyuti Das

    2017-12-01

    Full Text Available The present work attempts to identify critical success factors (CSFs influencing the performance of development projects based on their key performance indicators (KPIs. It has considered the case of Constituency Development Fund (CDF projects constructed between 2003 and 2011 in Kenya and secured the perceptions of 175 respondents comprising clients, consultants and contractors involved in the implementation of CDF projects on 30 success variables. Findings reveal that individual items constituting these six factors represent six CSFs namely project-related, client-related, consultant-related, contractor-related, supply chain-related, and external environment-related factor. The findings are also relevant to development projects undertaken in other developing countries.

  19. Final Project Summary Report Bechtel Nevada and Fiberchem Environmental, Inc., Cooperative Research and Technology Development Project

    R. J. Pollina

    1999-04-01

    This is a report summarizing work on a small project dedicated to adapting a new chemical sensing platform for the US Department of Energy and its customers. At the same time and in the spirit of technology transfer, FCI Environmental, Inc., would receive technical support in the form of expertise from the US Department of Energy to assist in developing this product. The sensor is a hybrid integrated-circuit, optical waveguide, chemical sensor that is patented by FCI Environmental, Inc., and manufactured under license by Texas Instruments, Inc. A down-hole penetrometer probe was designed for use in hot, 60 C, hydrocarbon-saturated, saline environment at a depth of 200 feet. The probe design includes three chemical sensing, hybrid integrated-circuits with chemical reference and measurement channels, a water seal, output electronics, and a removable measurement head for replacement in the field. A hand-held chemical detector prototype--containing a hybrid integrated-circuit chemical sensor with reference channel, user alarm, and level display--was designed and constructed, and a software interface developed to operate the hand-held sensor interfaced with a laboratory data acquisition system.

  20. Assessment of the Professional Training Course under Watershed Project at Fatehjang Field Station, Punjab, Pakistan

    Khan, M. N.; Hassan, T.; Shah, H.; Abid, S.; Raza, I.; Abbasi, S. S.

    2015-01-01

    Watershed Project organizing different professional trainings to create awareness about water saving technologies as solar powered irrigation system, drip irrigation, sprinkler irrigation, micro catchment, rooftop rainwater harvesting and irrigation scheduling. Therefore, the project activities also include the training of the professionals from the line departments for the demonstrated technologies to foster the process of adoption. For this purpose Climate and Alternate Energy Water Resources Institute, NARC, organized a professional training on Water Rehabilitation and Irrigation Technology Improvements in April, 2014 in collaboration with ICARDA and USDA. Twenty seven professionals from different organizations and departments namely; Al-Mustafa Development Network (ADN), Taleem Foundation, Islamic International University (IIUI) Islamabad, National Agricultural Research Centre (NARC), National Centre for Rural Development (NCRD), National Rural Support Programme (NRSP), On-Farm Water Management (OFWM), Water Management (WM), Potohar Organization for Development Advocacy (PODA), Quaid-i-Azam University (QAU) and Environmental Sciences actively participated in the professional training. The post-training assessment showed that it had positive impact on the awareness of professionals. Majority of the participants were strongly and merely agreed upon the training practicality, technologies adoption probability and its advantages at farmer's field. Overall, most of the training participants were satisfied with the knowledge sharing presentations about the specific technologies discussed during the training. (author)

  1. Innovative approach for risk assessment in green field geothermal project

    Batini, F.; Wees, J.-D. van

    2010-01-01

    At present, the worldwide geothermal energy production provides less than 1% of the world's energy needs but the geothermal resources confined in the first 6 km of the earth's crust are estimated to be in the fairly above 200 GW of which 50-80 GW are located in Europe. Exploring and developing at

  2. Faculty Development and Quality Assurance in the EU ERAMIS Project

    Agathe Merceron

    2012-07-01

    Full Text Available The aim of the ERAMIS project is to create a
    network of Masters degrees “Informatics as a Second
    Competence” in nine beneficiary universities of Kazakhstan,
    Kyrgyzstan and Russia. This contribution presents how
    faculty development is organized and quality assurance
    implemented inside this project.

  3. All projects related to | Page 25 | IDRC - International Development ...

    The Bolivian public justice performance research study. Project. The Bolivian justice system obtains a conviction in less than 0. Topic: Gender ... Making trade work for small producers in Southeast Asia's least developed countries. Project. Low-income economies depend greatly on agriculture, and growth in this sector ...

  4. Open Crowdsourcing: Leveraging Community Software Developers for IT Projects

    Phair, Derek

    2012-01-01

    This qualitative exploratory single-case study was designed to examine and understand the use of volunteer community participants as software developers and other project related roles, such as testers, in completing a web-based application project by a non-profit organization. This study analyzed the strategic decision to engage crowd…

  5. All projects related to | Page 209 | IDRC - International Development ...

    Project. Known for its dense human population, diverse wild animal species, and large population of domestic animals, Sri Lanka derives both risks and benefits from its wildlife. ... The Arab Council for the Social Sciences: Support for Institutional Development, Core Capacities, and an Inaugural Research Program. Project.

  6. All projects related to | Page 321 | IDRC - International Development ...

    Total Funding: CA$ 1,500,000.00. Universities and Councils Network on Innovation for Inclusive Development in Southeast Asia. Project. The recently completed IDRC-supported project, 104904 Science and Technology Innovation for the Base of the Pyramid (Southeast Asia), supported research on pro-poor innovations in ...

  7. Metrics-based control in outsourced software development projects

    Ponisio, Laura; van Eck, Pascal

    2012-01-01

    Measurements have been recognised as vital instruments to improve control in outsourced software development projects. However, project managers are still struggling with the design and implementation of effective measurement programs. One reason for this is that although there is a large body of

  8. Use of Multi-Disciplinary Projects To Develop Competence.

    Trotman-Dickenson, Danusia

    1992-01-01

    Undergraduate technology and business students at the Polytechnic of Wales (United Kingdom) participated in multi-disciplinary team projects to experience real life business challenges and develop competences that employers expect in professionals. Lists characteristics of successful multi-disciplinary projects, discusses cost and industry…

  9. Guidance and Control Software Project Data - Volume 2: Development Documents

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the development documents from the GCS project. Volume 2 contains three appendices: A. Guidance and Control Software Development Specification; B. Design Description for the Pluto Implementation of the Guidance and Control Software; and C. Source Code for the Pluto Implementation of the Guidance and Control Software

  10. Project Oasis : A Case Study in Jamaican Development Administration

    Gayle, Dennis J.; Drori, Israel D.

    1984-01-01

    This paper is concerned with development administration in practice, at the level of a particular project which was implemented in the Caribbean island of Jamaica in 1979. We are essentially concerned with the problem of the degree of fit between operational project objectives and the management of

  11. How does technological regime affect performance of technology development projects?

    Song, Michael; Hooshangi, Soheil; Zhao, Y. Lisa; Halman, Johannes I.M.

    2014-01-01

    In this study, we examine how technological regime affects the performance of technology development projects (i.e., project quality, sales, and profit). Technological regime is defined as the set of attributes of a technological environment where the innovative activities of firms take place.

  12. QFD Application to a Software - Intensive System Development Project

    Tran, T. L.

    1996-01-01

    This paper describes the use of Quality Function Deployment (QFD), adapted to requirements engineering for a software-intensive system development project, and sysnthesizes the lessons learned from the application of QFD to the Network Control System (NCS) pre-project of the Deep Space Network.

  13. Reading Research Utilization Project: An RIC Project for Teachers and Other Field Personnel.

    District of Columbia Public Schools, Washington, DC. Dept. of Research and Evaluation.

    This is the final report of the Reading Research Utilization Project (RUP) which was funded by the U.S. Office of Education from July, 1971 to June, 1973. The purpose of the RUP was to encourage the translation of research, particularly reading research, into practice in 16 target elementary schools in Washington, D.C. RUP was a school information…

  14. An Empirical Study of Capability Development within Product Innovation Projects

    Alireza Javanmardi Kashan

    2015-04-01

    Full Text Available The objective of this paper is to develop insights into firms’ strategic capability development processes within product innovation projects. In particular, the research aims at investigating the interactions among product innovation, knowledge processes, and capability development within firms. Building on qualitative data from the auto-industry, our analysis reveals that across four product innovation projects, the case company developed architectural knowledge and capability. Findings reveal that, along with changes at each level of product architecture, “design knowledge” and “design capability” have been developed at the same level of product architecture, leading to capability development at that level. Furthermore, findings suggest that such capability transformation resulting from knowledge and capability creation over the course of case projects leads to modularization of product architecture. Overall, the research contributes to identifying and emphasizing the role of micro processes in capability development and renewal, which in turn enhances our understanding of strategic capability development processes.

  15. Field Office Contact Information for Application Developers

    Social Security Administration — SSA provides a web service and downloadable file for SSA Field Office locations, telephone numbers, and hours of operation. (Note: If you think an office might be...

  16. Problems with Reporting and Evaluating Mining Industry Community Development Projects: A Case Study from Tanzania

    Esther Wangari

    2012-02-01

    Full Text Available Reporting on contributions to community development is one way gold mining companies communicate the expanse and depth of their commitment to social responsibility. These projects are intended to provide the mine-proximate communities with some of the wealth and other benefits generated by mine development in their locales. We raise questions about reporting and evaluation of community development projects undertaken by AngloGold Ashanti in the two communities of Nyakabale and Nyamalembo, near its Geita mining projects in the Lake Victoria goldfields of Tanzania. We use archival data and data obtained from field research conducted during different periods throughout 2005, 2007 and 2010 to compare what the company reports to have done with what is found on the ground. Our findings revealed that the corporate reporting is misleading, ambiguous, and omissive. Much of the effort labeled “community development” benefited the companies directly via infrastructure development, food supplies to the mine cafeteria, and worker health. We argue that, if Corporate Social Responsibility (CSR projects are to be the primary way local people directly benefit from mine development, the relationship between the value of those projects and the wealth taken from the location should be considered, community projects should be well defined and differentiated from company-oriented projects, and community representatives should participate in monitoring the success and impact of community development projects.

  17. Thermal Protection Test Bed Pathfinder Development Project

    Snapp, Cooper

    2015-01-01

    In order to increase thermal protection capabilities for future reentry vehicles, a method to obtain relevant test data is required. Although arc jet testing can be used to obtain some data on materials, the best method to obtain these data is to actually expose them to an atmospheric reentry. The overprediction of the Orion EFT-1 flight data is an example of how the ground test to flight traceability is not fully understood. The RED-Data small reentry capsule developed by Terminal Velocity Aerospace is critical to understanding this traceability. In order to begin to utilize this technology, ES3 needs to be ready to build and integrate heat shields onto the RED-Data vehicle. Using a heritage Shuttle tile material for the heat shield will both allow valuable insight into the environment that the RED-Data vehicle can provide and give ES3 the knowledge and capability to build and integrate future heat shields for this vehicle.

  18. New projects developed by COMOTI in gas industry

    Nitulescu, Marian; Silivestru, Valentin; Toma, Niculae; Slujitoru, Cristian; Petrescu, Valentin; Leahu, Mihai; Oniga, Ciprian; Ulici, Gheorghe

    2015-08-01

    The paper aims to present two new projects developed by the Romanian Research and Development Institute for Gas Turbines (COMOTI) in partnership with City University of London and GHH-Rand Germany, in the field of screw compressors/expanders. COMOTI passed, in recent years, from being a GHH-Rand licensed manufacturer for a range of oil-injected screw compressors, of CU type, to a new phase of range diversification, approaching screw compressors with a maximum discharge pressure of 45 bara. So, in cooperation with City University and GHH-Rand we design, manufacture and test, with air, in COMOTI test bench the new type of screw compressor named CHP 220. Also, the cooperation with GHH-Rand has resulted in the design, manufacture and air testing on the test bench, and then gas testing - in a gas compression station - for an electric generator driven by a screw expander. This paper presents how the tests were carried out, the experimental data and the interpretation of results

  19. FY 1999 survey report on the cooperative basic project on the heightening of international energy consumption efficiency. Cooperative survey project in energy conservation/environmental protection fields in developing countries (Indonesia, Myanmar, the Philippines, Thailand and Vietnam); 1999 nendo kokusai energy shohi koritsuka nado kyoryoku kiso jigyo. Hatten tojokoku ni okeru sho energy kankyo hozen bun'ya kyoryoku chosa jigyo (Indonesia, Myanmar, Philippines, Tai, Vietnam)

    NONE

    2000-03-01

    As to the pollution preventive administration, clean energy technology, etc. in fields of energy conservation technology, clean energy technology and environment in Japan, administrative officials, researchers and engineers in the fields concerned in Asian countries were invited to Japan for training with the aim of the technology transfer/spread to developing countries. In FY 1999, a total of 15 administrative officials and engineers were invited from Indonesia, Myanmar, the Philippines, Thailand and Vietnam, and had training at International Center for Environmental Technology Transfer. The themes for training are as follows: tackles with energy conservation/environmental protection by the Japanese government administration, pollution preventive measures against automobile gas emissions, pollution preventive measures against industrial gas emissions/waste water, technology for energy conservation, technology for industrial waste disposal, technology for recycling of wastes, etc. Reports were also made public on the situations of the countries participated in the project. Moreover, the field training was made at Yokkaichi complex, Sakakibara wind power plant, Hekinan thermal power plant of the Chubu Electric Power Co., Toyota Motor Corp., etc. (NEDO)

  20. FY 1999 survey report on the cooperative basic project on the heightening of international energy consumption efficiency. Cooperative survey project in energy conservation/environmental protection fields in developing countries (Indonesia, Myanmar, the Philippines, Thailand and Vietnam); 1999 nendo kokusai energy shohi koritsuka nado kyoryoku kiso jigyo. Hatten tojokoku ni okeru sho energy kankyo hozen bun'ya kyoryoku chosa jigyo (Indonesia, Myanmar, Philippines, Tai, Vietnam)

    NONE

    2000-03-01

    As to the pollution preventive administration, clean energy technology, etc. in fields of energy conservation technology, clean energy technology and environment in Japan, administrative officials, researchers and engineers in the fields concerned in Asian countries were invited to Japan for training with the aim of the technology transfer/spread to developing countries. In FY 1999, a total of 15 administrative officials and engineers were invited from Indonesia, Myanmar, the Philippines, Thailand and Vietnam, and had training at International Center for Environmental Technology Transfer. The themes for training are as follows: tackles with energy conservation/environmental protection by the Japanese government administration, pollution preventive measures against automobile gas emissions, pollution preventive measures against industrial gas emissions/waste water, technology for energy conservation, technology for industrial waste disposal, technology for recycling of wastes, etc. Reports were also made public on the situations of the countries participated in the project. Moreover, the field training was made at Yokkaichi complex, Sakakibara wind power plant, Hekinan thermal power plant of the Chubu Electric Power Co., Toyota Motor Corp., etc. (NEDO)

  1. Solar cells for Bolivia. Two project supported by the Dutch Ministry of Development Assistance

    Hassing, P.; Rijssenbeek, W.; De Winter, J.

    1998-01-01

    Since 1992 the Netherlands Development Assistance (NEDA) supports the energy sector in Bolivia, South-America. Next to support on the policy level demonstration projects in the field of renewable energy are financed successfully. Two solar energy projects form the start of a broad introduction of Solar Home Systems in rural areas of Bolivia. The main obstacle is the financing of the plans. 3 refs

  2. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 78, quarter ending March 31, 1994

    NONE

    1995-05-01

    This report presents descriptions of various research projects and field projects concerned with the enhanced recovery of petroleum. Contract numbers, principal investigators, company names, and project management information is included.

  3. Examining Thai high school students' developing STEM projects

    Teenoi, Kultida; Siripun, Kulpatsorn; Yuenyong, Chokchai

    2018-01-01

    Like others, Thailand education strongly focused on STEM education. This paper aimed to examine existing Thai high school students' integrated knowledge about science, technology, engineering, and mathematics (STEM) in their developing science project. The participants included 49 high school students were studying the subject of individual study (IS) in Khon Kaen wittayayon school, Khon Kaen, Thailand. The IS was provided to gradually enhance students to know how to do science project starting from getting start to do science projects, They enrolled to study the individual study of science project for three year in roll. Methodology was qualitative research. Views of students' integrated knowledge about STEM were interpreted through participant observation, interview, and students' science projects. The first author as participant observation has taught this group of students for 3 years. It found that 16 science projects were developed. Views of students' integrated knowledge about STEM could be categorized into three categories. These included (1) completely indicated integration of knowledge about science, technology, engineering, and mathematics, (2) partial indicated integration of knowledge about science, technology, engineering, and mathematics, and (3) no integration. The findings revealed that majority of science projects could be categorized as completely indicated integration of knowledge about science, technology, engineering, and mathematics. The paper suggested some ideas of enhancing students to applying STEM for developing science projects.

  4. All projects related to | Page 612 | IDRC - International Development ...

    All projects related to ... Competitiveness on the part of Egyptian enterprises is regarded as one of the key factors in the country's economic development. ... Modernizing Agrifood Markets : Including Small Producers in Dynamic Markets.

  5. All projects related to | Page 530 | IDRC - International Development ...

    Topic: Internet, CENSORSHIP, FREEDOM OF INFORMATION, FREEDOM OF SPEECH ... a driver of economic growth, social empowerment and citizen engagement. ... to broaden and deepen the impact of IFAD-funded development projects.

  6. All projects related to Tanzania | IDRC - International Development ...

    2018-03-21

    DataHack for financial inclusion: Creating a platform for young innovators to develop their ideas and take them to scale. Project ... Region: Argentina, Bangladesh, Cambodia, Colombia, Ghana, Guatemala, India, ... End Date: March 21, 2018.

  7. The Fox Project: Advanced Development of Systems Software

    1999-01-01

    The long-term objectives of the Carnegie Mellon Fox Project are to improve the design and construction of systems software and to further the development of advanced programming language technology...

  8. The Fox Project: Advanced Development of Systems Software

    2000-01-01

    The long-term objectives of the Carnegie Mellon Fox Project are to improve the design and construction of systems software and to further the development of advanced programming language technology...

  9. All projects related to Uruguay | IDRC - International Development ...

    English · Français ... Business Cooperation and Regional Productive Development in Chile, El Salvador, Paraguay, and Uruguay (TTI). Project. Several studies have shown that some forms of collaborative business networking can have a ...

  10. Navajo-Hopi Land Commission Renewable Energy Development Project (NREP)

    Thomas Benally, Deputy Director,

    2012-05-15

    The Navajo Hopi Land Commission Office (NHLCO), a Navajo Nation executive branch agency has conducted activities to determine capacity-building, institution-building, outreach and management activities to initiate the development of large-scale renewable energy - 100 megawatt (MW) or larger - generating projects on land in Northwestern New Mexico in the first year of a multi-year program. The Navajo Hopi Land Commission Renewable Energy Development Project (NREP) is a one year program that will develop and market a strategic business plan; form multi-agency and public-private project partnerships; compile site-specific solar, wind and infrastructure data; and develop and use project communication and marketing tools to support outreach efforts targeting the public, vendors, investors and government audiences.

  11. All projects related to Algeria | IDRC - International Development ...

    Developing and piloting business models to achieve impact at scale with mechanized forage processing in Tunisia. Project ... Topic: Gender. Region: Tunisia ... Topic: BRAIN, MATERNAL AND CHILD HEALTH, CANCER, THERAPY, CANADA.

  12. All projects related to | Page 111 | IDRC - International Development ...

    Tanzania, along with most African countries, has been struggling to address persistent nutritional challenges, including vitamin A and iron deficiencies. Topic: AFRICA, CANADA, PILOT PROJECTS, MEDIUM ENTERPRISES, SMALL ENTERPRISES, SUSTAINABLE DEVELOPMENT, TANZANIA, NUTRITION. Region: ...

  13. View all projects | IDRC - International Development Research Centre

    Education is a pillar of development. ... How can information and technology increase economic opportunities in the ... This project aims to strengthen the accountability and legitimacy of public institutions, improve public services, and fuel ...

  14. All projects related to | Page 92 | IDRC - International Development ...

    An mHealth strategy to reduce eclampsia and maternal and infant death in Tanzania (IMCHA) ... This project will develop and test novel, creative, and bold business models that increase the participation of ... Program: Cultivate Africa's Future.

  15. All projects related to Malawi | IDRC - International Development ...

    Improved municipal planning in African CiTies – IMPACT for a climate resilient future ... Expanding Business Opportunities for African Youth in Agricultural Value ... This project will develop and test novel, creative, and bold business models ...

  16. All projects related to | Page 132 | IDRC - International Development ...

    This project will analyze three state institutions in Tunisia, Egypt, and Yemen - the ... state-controlled religious institutions, and state-owned media - to assess the ... POLICY MAKING, MIDDLE EAST, Civil society, SOCIAL DEVELOPMENT.

  17. All projects related to Brazil | IDRC - International Development ...

    All projects related to Brazil ... Cellular senescence is a programmed response to oncogenic (tumour-causing) stress that aims to halt the expansion of cells ... Tackling online inequality: Making digital platforms work for inclusive development.

  18. NASA Remediation Technology Collaboration Development Task, Overview and Project Summaries

    Romeo, James G.

    2014-01-01

    An overview presentation of NASA's Remediation Technology Collaboration Development Task including the following project summaries: in situ groundwater monitor, in situ chemical oxidation, in situ bioremediation, horizontal multi-port well, and high resolution site characterization.

  19. Growth and Project Finance in the Least Developed Countries

    la Cour, Lisbeth F.; Müller, Jennifer

    2014-01-01

    for economic growth in LDCs. We find that a higher regulatory quality, lower government consumption and a higher level of education helps increase growth. The significance of these variables are, however, not as consistently robust as the results for project finance.......This article examines the effects of project finance on economic growth in the least developed countries (LDC). Inspired by the neoclassical growth model we set up an econometric model to estimate the effects of project finance for a sample consisting of 38 of the least developed countries using...... data from the period 1994-2007. The results of our study suggest, that project finance has a significant positive effect on economic growth and therefore constitute an important source of financing in the selected set of countries. Additionally, the project sheds light on other factors of importance...

  20. Wake models developed during the Wind Shadow project

    Larsen, S.; Ott, S.; Pena, A.; Berg, J.; Nielsen, M.; Rathmann, O.; Joergensen, H.

    2011-11-15

    The Wind Shadow project has developed and validated improved models for determining the wakes losses, and thereby the array efficiency of very large, closely packed wind farms. The rationale behind the project has been that the existing software has been covering these types of wind farms poorly, both with respect to the densely packed turbines and the large fetches needed to describe the collective shadow effects of one farm to the next. Further the project has developed the necessary software for the use of the models. Guidelines with recommendations for the use of the models are included in the model deliverables. The project has been carried out as a collaborative project between Risoe DTU, DONG, Vattenfall, DNV and VESTAS, and it has been financed by energinet.dk grant no. 10086. (Author)

  1. INFLUENCES ON ORGANISATIONAL SLACK IN NEW PRODUCT DEVELOPMENT PROJECTS

    ANDERS RICHTNÉR; PÄR ÅHLSTRÖM

    2006-01-01

    Programs to decrease cost and to increase operational efficiency may reduce a company's ability to innovate, by reducing organisational slack. Previous research on the relationship between organisational slack and innovation has been at level of the firm and has neglected the processes underlying the relationship, which takes place at the level of product development projects. In this paper, we identify organisational slack and its influences at the level of the product development project. T...

  2. Advancements in the field of personality development.

    De Fruyt, Filip; Van Leeuwen, Karla

    2014-07-01

    A summary is provided what the fields of personality and developmental psychology had to offer each other the past decade, reflected in the eleven contributions enclosed in this special issue. Strengths and opportunities to further advance the field are identified, including the extension of general trait with maladaptive trait models, the use of alternative methods to assess personality, and the adoption of configural approaches to describe traits in individuals, beyond more traditional person-centered approaches. Copyright © 2014 The Foundation for Professionals in Services for Adolescents. Published by Elsevier Ltd. All rights reserved.

  3. Financing the development of renewable energy projects of territorial interest

    Regnier, Yannick; Bailleul, Esther; Claustre, Raphael; Bessiere, Patrick; Boumard, Erwan; Peulemeulle, Justine; Causse, Laurent; Coton, Patrice; Djemouai, Nadia; Dubus, Jean-Michel; Duffes, Thomas; Gauduchon, Marie-Veronique; Raguet, Alex; Ghewy, Etienne; Heitz, Philippe; Jedliczka, Marc; Jourdain, Pierre; Julien, Emmanuel; Marcenac, Guillaume; Marillier, Frederic; Massias, Louis; Picot, Roland; Poize, Noemie; Quantin, Jacques; Rabian, Jean; Rocaboy, Dominique; Rumolino, Claudio; Sabin, Patrick; Saultier, Patrick; Tincelin-Salomon, Claire; Trillaud, Nicolas; Vachette, Philippe; Verhaeghe, Laure

    2016-11-01

    This report highlights the relationship between a territorial project (its autonomous strategy) and projects of renewable energy which could and should be developed. It focuses on large projects of electric power production, notably those based on solar and wind energy for which such a territorial anchoring is not as obvious as for the production of heat or gas (heat networks are necessarily local, and biomass production and supply as well). Thus, its outlines how these projects can be a benefit for a territory, the stakes of participation for the different local actors, and discusses how such a participation is to be organised. It describes different aspects of the way a project development phase is to be financed: stakes (financing needs, risks, peculiarities of local financing, project management and governance), financing typologies, development ease and safety, support of development financing (capital-risk tools, intervention of local public companies, advance payments, subsidies). The last part addresses how to locally finance the other project phases (stakes during construction and exploitation, intervention modes by participation, financial tools or loans)

  4. Imaging Seismic Source Variations Using Back-Projection Methods at El Tatio Geyser Field, Northern Chile

    Kelly, C. L.; Lawrence, J. F.

    2014-12-01

    During October 2012, 51 geophones and 6 broadband seismometers were deployed in an ~50x50m region surrounding a periodically erupting columnar geyser in the El Tatio Geyser Field, Chile. The dense array served as the seismic framework for a collaborative project to study the mechanics of complex hydrothermal systems. Contemporaneously, complementary geophysical measurements (including down-hole temperature and pressure, discharge rates, thermal imaging, water chemistry, and video) were also collected. Located on the western flanks of the Andes Mountains at an elevation of 4200m, El Tatio is the third largest geyser field in the world. Its non-pristine condition makes it an ideal location to perform minutely invasive geophysical studies. The El Jefe Geyser was chosen for its easily accessible conduit and extremely periodic eruption cycle (~120s). During approximately 2 weeks of continuous recording, we recorded ~2500 nighttime eruptions which lack cultural noise from tourism. With ample data, we aim to study how the source varies spatially and temporally during each phase of the geyser's eruption cycle. We are developing a new back-projection processing technique to improve source imaging for diffuse signals. Our method was previously applied to the Sierra Negra Volcano system, which also exhibits repeating harmonic and diffuse seismic sources. We back-project correlated seismic signals from the receivers back to their sources, assuming linear source to receiver paths and a known velocity model (obtained from ambient noise tomography). We apply polarization filters to isolate individual and concurrent geyser energy associated with P and S phases. We generate 4D, time-lapsed images of the geyser source field that illustrate how the source distribution changes through the eruption cycle. We compare images for pre-eruption, co-eruption, post-eruption and quiescent periods. We use our images to assess eruption mechanics in the system (i.e. top-down vs. bottom-up) and

  5. Development of training courses in the field of nuclear energy

    Lee, Han Young; Soe, In Seok; Lee, Ui Jin; Park, Jae Chang; Kim, Ik Hyeon; Won, Jong Yeol; Nam, Jae Yeol

    1993-12-01

    The nuclear training center provides various training courses in such areas of nuclear energy as nuclear power technology, radioisotope applications technology, non-destructive technology, nuclear safety, etc. The center also provides in-house staff training courses in project management, computer applications, and other research areas. The objective of the project is to develop new specialized training courses not only nuclear energy areas but also in management, so that localization of nuclear project can be accomplished as early as possible. The scope and contents of the project envision the following aims; 1. to develop specialized nuclear training programs; 2. to develop project management training courses for KAERI staff; 3. to collect and analyze foreign training programs and materials; 4. to develop foreign-assisted training courses; and 5. to develop international training courses for developing country trainese

  6. Systems design and engineering : facilitating multidisciplinary development projects

    Bonnema, Gerrit Maarten; Veenvliet, Karel; Broenink, Johannes F.

    2016-01-01

    As its name implies, the aim of Systems Design and Engineering: Facilitating Multidisciplinary Development Projects is to help systems engineers develop the skills and thought processes needed to successfully develop and implement engineered systems. Such expertise typically does not come through

  7. Research and development project report for FY 1996

    NONE

    1997-09-01

    This report summarizes results of research and development projects administered by NEDO for FY 1996. Overview of new energy projects and twelve chapters for individual projects are provided in the report. The new energy technology development projects administered by NEDO are classified into twelve categories, i.e., Development of technologies for solar energy utilization, Development of geothermal resources, Development of technologies for exploration and utilization of geothermal energy, Development of coal energy utilization technologies, Development of coal resources, Development of energy conversion and storage technologies, Development of hydrogen, alcohol and biomass technologies, Development of other oil-alternative energy technologies, Introduction and promotion of new energy sources, International energy-promotion activities, Promotion of development and introduction, and Activities of the NEDO Information Center. To ensure energy security and actively cope with environmental problems such as by taking carbon dioxide emission control measures, NEDO has stepped up its efforts to develop new energy- and energy saving-related technologies and introduce and diffuse them. 79 figs., 37 tabs.

  8. Interpretation, compilation and field verification procedures in the CARETS project

    Alexander, Robert H.; De Forth, Peter W.; Fitzpatrick, Katherine A.; Lins, Harry F.; McGinty, Herbert K.

    1975-01-01

    The production of the CARETS map data base involved the development of a series of procedures for interpreting, compiling, and verifying data obtained from remote sensor sources. Level II land use mapping from high-altitude aircraft photography at a scale of 1:100,000 required production of a photomosaic mapping base for each of the 48, 50 x 50 km sheets, and the interpretation and coding of land use polygons on drafting film overlays. CARETS researchers also produced a series of 1970 to 1972 land use change overlays, using the 1970 land use maps and 1972 high-altitude aircraft photography. To enhance the value of the land use sheets, researchers compiled series of overlays showing cultural features, county boundaries and census tracts, surface geology, and drainage basins. In producing Level I land use maps from Landsat imagery, at a scale of 1:250,000, interpreters overlaid drafting film directly on Landsat color composite transparencies and interpreted on the film. They found that such interpretation involves pattern and spectral signature recognition. In studies using Landsat imagery, interpreters identified numerous areas of change but also identified extensive areas of "false change," where Landsat spectral signatures but not land use had changed.

  9. Dream Team - A pregraduate surgical talent development project

    Jensen, Rune Dall; Seyer-Hansen, Mikkel; Christensen, Mette Krogh

    Dream Team is an extracurricular pregraduate surgical talent development project founded in 2009 at Aarhus University Hospital, Denmark. It aims to identify and develop laparoscopic surgical talents during medical school. Dream Team contains two parts: 1) a weeklong boot camp where app. 10 % of 8th...... the mentorship the students will be in operation room at least once a week and participate as much as their skills allow. Dream Team differs from similar pregraduate programs as it selects the most talented students, but does the boot camp select the best and does the mentorship program provide optimal learning......? A PhD project aims to critically analyze and develop Dream Team. The PhD project is based on theories about deliberate practice[1] and social learning[2]. In addition, we compare surgical talent development[3][4] with talent development in elite sport in order to inspire, refine and develop Dream Team...

  10. Report on the consultants' meeting to: Outline a co-ordinated research project on trace element speciation to enhance technology transfer in this field by the development of suitable methodologies and/or the production of suitably characterised reference materials

    2001-01-01

    In the environment and in man, the total concentration of a given element in a sample is almost always comprised of two or more discrete chemical forms. The toxicological or nutritive impact of the element in the sample in the environment or when ingested by man will be dependent upon the properties of its individual components. Therefore, in order to make meaningful benefit or risk assessment statements, it is essential to have a knowledge of the forms and relative amounts of an element in a given matrix. When the analyte in question is only present at total concentrations at the trace level (mg.kg -1 ) or below, the problems involved in obtaining this information become much more complex. The term trace metal speciation has been coined to refer to the determination of the chemical forms and quantities of an analyte present in a sample at the trace (and ultra trace) level. Even at such relatively low levels, the presence or absence of specific forms of an analyte can have serious consequences in terms of trade, health and environmental management. In light of the PPAS External Reviewers' Report of the Consultants' Meeting on Analytical Quality Control Services (October 1997, Vienna) which recommended that characterisation of chemical species should be undertaken in AQCS reference materials, the Agency decided to convene a consultants' meeting specifically to advise it on the importance of trace metal speciation, the state of the art and the value of a CRP to address aspects of speciation in order to facilitate technology transfer and equip member states with appropriate tools to meet the challenges posed. Five scientists, recognised as experts in the field of trace metal speciation were identified and invited to the Agency's headquarters to act as consultants. The meeting was held at the Vienna International Centre from 23rd to 26th November 1998. The first day of the meeting was given over to presentations from the consultants on various aspects of trace element

  11. New product development processes for ICT-for-development projects

    McAlister, BN

    2012-08-01

    Full Text Available in developing regions of the world is increasing rapidly. A number of methods and practices have been used by organizations to develop and deliver such ICT solutions, but a need exists to formalize product development processes for use in the ICT...

  12. Hydropower in Hawaii: Developing the Wailuku River project

    Barnes, M.J.

    1993-01-01

    When the 10-MW Wailuku River Hydroelectric Project begins operating this summer, the island of Hawaii will reduce its dependence on oil. The project is illustrative of what must be done to add to the electricity supply and, at the same time, to protect the environment. The Wailuku project is the first hydro plant to be developed in Hawaii in more than 50 years and is the largest hydro facility ever built in the state. The project is being developed by Wailuku River Hydroelectric Power Co., a wholly owned subsidiary of Synergics, Inc. Hawaii Electric Light Company Inc. (HELCO) will buy the electricity generated at the project for 30 years on an as-delivered basis at its avoided cost rate, now approximately 6.71 cents per kilowatt-hour, the floor rate in the contract. The Wailuku endeavor receives rave reviews form the mayor of Hilo, the president of the utility, and local residents. The project demanded a high degree of sensitivity to environmental issues and the uniqueness of the Hawaiian culture and island setting, according to Wayne Rogers, president of Wailuku River Hydro. From the conception of this project, we have worked closely with state and local interests and have been committed to following Hawaii's plans for land use and environmentally responsible energy development

  13. The 2001 activities and the 3rd workshop of the human resources development project in FNCA

    2002-07-01

    In 1999, the Project for Human Resources Development (HRD) was initiated as defined in the framework of the Forum for Nuclear Cooperation in Asia (FNCA), organized by the Atomic Energy Commission of Japan. The objective of the HRD Project is to solidify the foundation of technologies for nuclear development and utilization in Asia by promoting human resources development in Asian countries. In the Project are two kinds of activity; In-workshop activity and Outside-of-workshop activity. The 3rd Workshop on Human Resources Development in the Nuclear Field was held on October 29 to November 1, at the Nuclear Training Center of KAERI. Participating countries were China, Indonesia, Republic of Korea, Japan, Malaysia, the Philippines, Thailand, and Vietnam. The secretariat for the Human Resources Development Project is provided by the Nuclear Training Center of the Korea Atomic Energy Research Institute and the Nuclear Technology and Education Center of the Japan Atomic Energy Research Institute. This report consists of presentation papers and materials at the Workshop as In-Workshop Activity, a document of project review on Human Resources Development for the fourth Coordinators Meeting of FNCA at Tokyo on March, 2002, a letter of proposal from the Project Leader of Japan to the project leaders of the participating countries, and training materials of participating countries as Outside-Workshop Activity. (author)

  14. Faculty development: a 'field of dreams'?

    Steinert, Yvonne; McLeod, Peter J; Boillat, Miriam; Meterissian, Sarkis; Elizov, Michelle; Macdonald, Mary Ellen

    2009-01-01

    Participants in faculty development workshops often comment that 'those who need faculty development the most attend the least'. The goals of this study were to explore the reasons why some clinical teachers do not participate in centralised faculty development activities and to learn how we can make faculty development programmes more relevant to teachers' needs. In 2006, we conducted focus groups with 16 clinical teachers, who had not participated in faculty development activities, to ascertain their perceptions of faculty development, reasons for non-participation and perceived barriers to involvement. Content analysis and team consensus guided the data interpretation. Focus group participants were aware of faculty development offerings and valued the goals of these activities. Important reasons for non-participation emerged: clinical reality, which included volume of work and lack of (protected) time; logistical issues, such as timing and the central location of organised activities; a perceived lack of financial reward and recognition for teaching, and a perceived lack of direction from, and connection to, the university. Clinical reality and logistical issues appeared to be greater deterrents to participation than faculty development goals, content or strategies. Moreover, when asked to discuss faculty development, teachers referred to their development as faculty members in the broadest sense, which included personal and career development. They also expressed the desire for clear guidance from the university, financial rewards and recognition for teaching, and a sense of 'belonging'. Faculty development programmes should try to address these organisational issues as well as teachers' personal and professional needs.

  15. The Greenland analogue project, sub-project C 2008 field and data report

    Aaltonen, I.; Lehtinen, A.; Lintinen, P.; Ruskeeniemi, T.; Douglas, B.; Liljedahl, L. C.; Frape, S.; Henkemans, E.; Hobbs, M.; Klint, K.E.

    2010-10-01

    Site investigations for location of deep geological repositories for spent nuclear fuel have been undertaken and/or are ongoing in Sweden and Finland. The repository will be designed so that radiotoxic material is kept separated from humankind and the environment for several hundred thousand of years. Within this time, frame glaciated period(s) are expected to occur and the effects of the glaciation cycles on a deep geological repository need to be evaluated during the siting process. In order to achieve a better understanding of the expected conditions during future glaciations in Northern Europe and Canada, a modern ice age analogue project (the Greenland Analogue Project, GAP), has been initiated. The Greenland ice sheet is considered an an analogue to future glaciations in Fennoskandia and Canada. The project consists of three discipline specific sub-projects (A, B and C). This document reports the data obtained, and the prelimininary interpretations made, in sub-project C from the bedrock mapping and hydrogeochemical sampling and monitoring in the Kangerlussuaq area (Soendre Stroeoemfjord), West Greenland in 2008. Gently sloping landscape in the Kangerlussuaq area is controlled by bedrock ridges with a prominent south-southwest to north-northeast trend. Ice marginal landforms such as moraine ridges and kame terraces are common as well as periglacial features such as patterned ground, hummocks, ice-wedges, erratics with honeycomb weathering and loss characteristics the soil surfaces. Shallow temperature profiles from soil drill holes (15 m) show that the mean annual ground temperatures (MAGT) close to the airport are around -2 deg C (van Tatenhoven and Olesen 1994). Based on these data, the permafrost is modelled to be 90-160 m thick. It is argued that the infrastructure (airport) may somewhat increase the temperatures, but the main uncertainty is due to the fact that the modelling didn't take into account the change in thermal properties when moving from soil

  16. A desk evaluation review of project RAF/9/005 radiation protection development. Project desk evaluation

    1994-01-01

    The Agency has been assisting member nations through a number of national TC projects in radiation protection and related areas over the years. In addition, a regional project RAF/9/005 - Radiation Protection Development (which is under this review) was approved in 1988, with the aim of assessing existing radiation protection practices in the African Member States in relation to the Agency's new basic safety standards for radiation protection, and to advise Governments on improvements. The project was subsequently extended up to 1994 as an umbrella project to assist all African Member States in the development of appropriate radiation protection services; to co-ordinate the implementation of the relevant national TC projects; and to develop co-operation amongst groups of Member States on a regional and sub-regional basis. Particular emphasis was to be given to manpower development through workshops, seminars and training courses in radiation protection and safety. In parallel thereto, the Agency's Radiation Protection Advisory Teams (RAPATs) visited nineteen African Member States during the period 1986 through 1993, to review and assess their radiation protection activities, identify priorities, and design long-term radiation protection programmes. RAPAT findings and recommendations were considered in drawing up programmes for implementation under project RAF/9/005

  17. Development of the near field geochemistry model

    Arcos, D.; Bruno, J.; Duro, L.; Grive, M.

    2000-01-01

    This report discusses in a quantitative manner the evolution of the near field geochemistry as a result of the interactions between two different introducing granitic groundwaters and the FEBEX bentonite as a buffer material. The two granitic groundwaters considered are: SR-5 water, sampled in a borehole at 500 m depth in Mina Ratones, and a mean composition of different granitic groundwaters from the iberian Massif. The steel canister has also been introduced by considering the iron corrosion in anoxic conditions. (Author)

  18. Understanding and Managing Process Interaction in IS Development Projects

    Bygstad, Bendik; Nielsen, Peter Axel

    2005-01-01

    Increasingly, information systems must be developed and implemented as a part of business change. This is a challenge for the IS project manager, since business change and information systems development usually are performed as separate processes. Thus, there is a need to understand and manage......-technical innovation in a situation where the organisational change process and the IS development process are parallel but incongruent. We also argue that iterative software engineering frameworks are well structured to support process interaction. Finally, we advocate that the IS project manager needs to manage...... the relationship between these two kinds of processes. To understand the interaction between information systems development and planned organisational change we introduce the concept of process interaction. We draw on a longitudinal case study of an IS development project that used an iterative and incremental...

  19. Wielding and yielding : power, subordination and gender identity in the context of a Mexican development project

    Villarreal, M.

    1994-01-01

    Three lines of inquiry can be found in the present study. The first is of an empirical nature. It is a story of a group of women and a development project, based upon field research I carried out in 1987-88 concerning a group of female beekeepers who were organized as an UAIM

  20. Report on survey for high-performance industrial furnace introduction field test project in fiscal 1999. Verification work on achievements of industrial furnace development in 1999 by using theoretical method; 1999 nendo koseino kogyoro donyu field test jigyo chosa hokokusho. 1999 nendo koseino kogyoro kaihatsu seika no rironteki shuho ni yoru kakusho gyomu

    NONE

    2000-03-01

    The high-performance industrial furnace introduction field test project has been executed from fiscal 1998 through fiscal 2000. Fiscal 1999 has performed measurements, evaluations, analyses, and follow-ups on representative demonstration furnaces, subsequently from fiscal 1998. At the same time, theoretical discussions were given to understand the details of the achievements. The measurements and investigations on the representative demonstration furnaces verified remarkable enhancement in the waste heat recovery rate, and noticeable reduction in the fuel unit requirement. In order to understand in-furnace phenomena and heat conduction mechanisms, simulations were made on combustion gas flows, combustion reactions, and heat conduction by using three-dimensional and non-steady state continuous analyses. The method used is an effective method to elucidate the in-furnace gas temperature distribution in terms of space and time, and evaluate the heat conducting performance quantitatively. The result obtained in the current fiscal year on the overall heat absorption rate was found to be about the same value as for conventional furnaces. The temperature efficiency calculation value for the heat recovering device was 90 to 95%, which is much higher than that for the conventional furnaces of 30 to 60%. The calculation value for the fuel unit requirement was also reduced by 20 to 30% from that of the conventional furnaces. The simulation result is effective in understanding the heat conduction performance enhancing mechanism, having been supplemented by the measurements. (NEDO)

  1. High field superconductor development and understanding

    Larbalestier, David C. [Florida State Univ., Tallahassee, FL (United States); Lee, Peter J. [Florida State Univ., Tallahassee, FL (United States); Tarantini, Chiara [Florida State Univ., Tallahassee, FL (United States)

    2014-09-28

    All present circular accelerators use superconducting magnets to bend and to focus the particle beams. The most powerful of these machines is the large hadron collider (LHC) at CERN. The main ring dipole magnets of the LHC are made from Nb-Ti but, as the machine is upgraded to higher luminosity, more powerful magnets made of Nb3Sn will be required. Our work addresses how to make the Nb3Sn conductors more effective and more suitable for use in the LHC. The most important property of the superconducting conductor used for an accelerator magnet is that it must have very high critical current density, the property that allows the generation of high magnetic fields in small spaces. Nb3Sn is the original high field superconductor, the material which was discovered in 1960 to allow a high current density in the field of about 9 T. For the high luminosity upgrade of the LHC, much higher current densities in fields of about 12 Tesla will be required. The critical value of the current density is of order 2600 A/mm2 in a field of 12 Tesla. But there are very important secondary factors that complicate the attainment of this critical current density. The first is that the effective filament diameter must be no larger than about 40 µm. The second factor is that 50% of the cross-section of the Nb3Sn conductor that is pure copper must be protected from any poisoning by any Sn leakage through the diffusion barrier that protects the package of niobium and tin from which the Nb3Sn is formed by a high temperature reaction. These three, somewhat conflicting requirements, mean that optimization of the conductor is complex. The work described in this contract report addresses these conflicting requirements. They show that very sophisticated characterizations can uncover the way to satisfy all 3 requirements and they also suggest that the ultimate optimization of Nb3Sn is still not yet in sight

  2. Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline

    Gelles, C. M.; Sheppard, F. R.

    2002-01-01

    This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program

  3. Ghost sector of vacuum string field theory and the projection equation

    Potting, Robertus; Raeymaekers, Joris

    2002-01-01

    We study the ghost sector of vacuum string field theory where the BRST operator Q is given by the midpoint insertion proposed by Gaiotto, Rastelli, Sen and Zwiebach. We introduce a convenient basis of half-string modes in terms of which Q takes a particularly simple form. We show that there exists a field redefinition which reduces the ghost sector field equation to a pure projection equation for string fields satisfying the constraint that the ghost number is equally divided over the left- and right halves of the string. When this constraint is imposed, vacuum string field theory can be reformulated as a U(∞) cubic matrix model. Ghost sector solutions can be constructed from projection operators on half-string Hilbert space just as in the matter sector. We construct the ghost sector equivalent of various well-known matter sector projectors such as the sliver, butterfly and nothing states. (author)

  4. Successful Training Development and Implementation in Plant Modernization Projects

    Kuhn, A.; Schoenfelder, C.

    2012-01-01

    In plant modernization projects, for life extension or power update, the competence development (in particular, job and needs oriented training) of the plant staff plays an important role for ensuring the highest standard of nuclear safety, and for facilitating an economic operation of the plant. This paper describes challenges, methodology, activities, and results obtained so far from an on-going project in Sweden. - - As conclusion, critical factors for a successful staff training in plant modernization projects include a systematic approach to training, a dedicated training management team, and good interfaces between supplier's engineering teams, experienced training providers, and equipment suppliers.

  5. Development of human factors engineering guide for nuclear power project

    Wu Dangshi; Sheng Jufang

    1997-01-01

    'THE PRACTICAL GUIDE FOR APPLICATION OF HUMAN FACTORS ENGINEERING TO NUCLEAR POWER PROJECT (First Draft, in Chinese)', which was developed under a research program sponsored by National Nuclear Safety Administration (NNSA) is described briefly. It is hoped that more conscious, more systematical and more comprehensive application of Human Factors Engineering to the nuclear power projects from the preliminary feasibility studies up to the commercial operation will benefit the safe, efficient and economical operations of nuclear power plants in China

  6. Coordinating Management Activities in Distributed Software Development Projects

    Bendeck, Fawsy; Goldmann, Sigrid; Holz, Harald; Kötting, Boris

    1999-01-01

    Coordinating distributed processes, especially engineering and software design processes, has been a research topic for some time now. Several approaches have been published that aim at coordinating large projects in general, and large software development processes in specific. However, most of these approaches focus on the technical part of the design process and omit management activities like planning and scheduling the project, or monitoring it during execution. In this paper, we focus o...

  7. 3D fingerprint imaging system based on full-field fringe projection profilometry

    Huang, Shujun; Zhang, Zonghua; Zhao, Yan; Dai, Jie; Chen, Chao; Xu, Yongjia; Zhang, E.; Xie, Lili

    2014-01-01

    As an unique, unchangeable and easily acquired biometrics, fingerprint has been widely studied in academics and applied in many fields over the years. The traditional fingerprint recognition methods are based on the obtained 2D feature of fingerprint. However, fingerprint is a 3D biological characteristic. The mapping from 3D to 2D loses 1D information and causes nonlinear distortion of the captured fingerprint. Therefore, it is becoming more and more important to obtain 3D fingerprint information for recognition. In this paper, a novel 3D fingerprint imaging system is presented based on fringe projection technique to obtain 3D features and the corresponding color texture information. A series of color sinusoidal fringe patterns with optimum three-fringe numbers are projected onto a finger surface. From another viewpoint, the fringe patterns are deformed by the finger surface and captured by a CCD camera. 3D shape data of the finger can be obtained from the captured fringe pattern images. This paper studies the prototype of the 3D fingerprint imaging system, including principle of 3D fingerprint acquisition, hardware design of the 3D imaging system, 3D calibration of the system, and software development. Some experiments are carried out by acquiring several 3D fingerprint data. The experimental results demonstrate the feasibility of the proposed 3D fingerprint imaging system.

  8. Recent developments in radiation field control technology

    Wood, C.J.

    1995-01-01

    The U.S. nuclear power industry has been remarkably successful in reducing worker radiation exposures over the past ten years. There has been over a fourfold reduction in the person-rem incurred for each MW.year of electric power generated: from 1.8 in 1980, to only 0.39 person-rems in 1991 and 1992. Preliminary data for 1993 are even lower: approximately 0.37 person-rem.MW.year. Despite this substantial improvement, challenges for the industry remain. Individual exposure limits have been tightened in ICRP 60 and there will be increased requirements for special maintenance work as plants age, suggesting that vigorous efforts with be increased requirements for special maintenance work as plants age, suggesting that vigorous efforts will be required to meet the industry goals for 1995. Reducing out-of-core radiation fields offer the best chance of continuing the downward trend in exposures. To assist utilities select the most economic technology for their specific plants, EPRI has published a manual capturing worldwide operating experience with radiation-field control techniques (TR-100265). No one method will suffice, but implementing suitable combinations from this collection will enable utilities to achieve their exposure goals. Radiation reduction is generally cost-effective: outages are shorter, manpower requirements are reduced and work quality is improved. Despite the up front costs, the benefits over the following 1-3 years typically outweigh the expenses

  9. Recent developments in radiation field control technology

    Wood, C.J. [Electric Power Research Institute, Palo Alto, CA (United States)

    1995-03-01

    The U.S. nuclear power industry has been remarkably successful in reducing worker radiation exposures over the past ten years. There has been over a fourfold reduction in the person-rem incurred for each MW.year of electric power generated: from 1.8 in 1980, to only 0.39 person-rems in 1991 and 1992. Preliminary data for 1993 are even lower: approximately 0.37 person-rem.MW.year. Despite this substantial improvement, challenges for the industry remain. Individual exposure limits have been tightened in ICRP 60 and there will be increased requirements for special maintenance work as plants age, suggesting that vigorous efforts with be increased requirements for special maintenance work as plants age, suggesting that vigorous efforts will be required to meet the industry goals for 1995. Reducing out-of-core radiation fields offer the best chance of continuing the downward trend in exposures. To assist utilities select the most economic technology for their specific plants, EPRI has published a manual capturing worldwide operating experience with radiation-field control techniques (TR-100265). No one method will suffice, but implementing suitable combinations from this collection will enable utilities to achieve their exposure goals. Radiation reduction is generally cost-effective: outages are shorter, manpower requirements are reduced and work quality is improved. Despite the up front costs, the benefits over the following 1-3 years typically outweigh the expenses.

  10. Optimization of a large integrated area development of gas fields offshore Sarawak, Malaysia

    Inyang, S.E.; Tak, A.N.H.; Costello, G.

    1995-01-01

    Optimizations of field development plans are routine in the industry. The size, schedule and nature of the upstream gas supply project to the second Malaysia LNG (MLNG Dua) plant in Bintulu, Sarawak made the need for extensive optimizations critical to realizing a robust and cost effective development scheme, and makes the work of more general interest. The project comprises the upstream development of 11 offshore fields for gas supply to MLNG Dua plant at an initial plateau production of 7.8 million tons per year of LNG. The gas fields span a large geographical area in medium water depths (up to 440 ft), and contain gas reserves of a distinctly variable gas quality. This paper describes the project optimization efforts aimed to ensure an upstream gas supply system effectiveness of over 99% throughout the project life while maintaining high safety and environmental standards and also achieving an economic development in an era of low hydrocarbon prices. Fifty percent of the first of the three phases of this gas supply project has already been completed and the first gas from these fields is scheduled to be available by the end of 1995

  11. Automating the management of software projects in a developing IT ...

    The resultant network-based software tool was developed on object-oriented technology using Java. The study established that good management practices may still be applied by the Nigerian software industry that lacks expertise in software management. Multi-site development approach facilitates large projects by using ...

  12. All projects related to | Page 178 | IDRC - International Development ...

    Region: Brazil, South America, China, Far East Asia, India, South Africa, North of Sahara, South of Sahara, North and Central America, Central Asia, South Asia. Total Funding: CA$ 95,730.00. Analyzing Financial Flows from Emerging Economies to the Developing World. Project. The context of development assistance is ...

  13. Steam generator development in France for the Super Phenix project

    Robin, M.G.

    1975-01-01

    'Steam Generator Development for Super Phenix Project'. The development program of steam generators studied by Fives-Cail Babcock and Stein Industrie Companies, jointly with CEA end EDF, for the Super Phenix 1200 MWe Fast Breeder Power Plant, is presented. The main characteristics of both sodium heated steam generators are emphasized and experimental studies related to their key features are reported. (author)

  14. All projects related to | Page 8 | IDRC - International Development ...

    Improving early childhood development and well-being in refugee and other marginalized countries. Project. Early childhood development research has traditionally focused on single-intervention initiatives and non-refugee populations. Region: Kenya, Bangladesh, India, Canada, South Africa, Pakistan. Program: Maternal ...

  15. Development of a database system for near-future climate change projections under the Japanese National Project SI-CAT

    Nakagawa, Y.; Kawahara, S.; Araki, F.; Matsuoka, D.; Ishikawa, Y.; Fujita, M.; Sugimoto, S.; Okada, Y.; Kawazoe, S.; Watanabe, S.; Ishii, M.; Mizuta, R.; Murata, A.; Kawase, H.

    2017-12-01

    . Techniques of the database system for near-future climate change projections might be quite useful for simulation and observational data in other research fields. We report current status of development and some case studies of the database system for near-future climate change projections.

  16. SAR China Land Mapping Project: Development, Production and Potential Applications

    Zhang, Lu; Guo, Huadong; Liu, Guang; Fu, Wenxue; Yan, Shiyong; Song, Rui; Ji, Peng; Wang, Xinyuan

    2014-01-01

    Large-area, seamless synthetic aperture radar (SAR) mosaics can reflect overall environmental conditions and highlight general trends in observed areas from a macroscopic standpoint, and effectively support research at the global scale, which is in high demand now across scientific fields. The SAR China Land Mapping Project (SCLM), supported by the Digital Earth Science Platform Project initiated and managed by the Center for Earth Observation and Digital Earth, Chinese Academy of Sciences (CEODE), is introduced in this paper. This project produced a large-area SAR mosaic dataset and generated the first complete seamless SAR map covering the entire land area of China using EnviSat-ASAR images. The value of the mosaic map is demonstrated by some potential applications in studies of urban distribution, rivers and lakes, geologic structures, geomorphology and paleoenvironmental change

  17. Measurement of magnetic and electric field inhomogenities in a time projection chamber using laser tracks

    Benetta, M.; Froberger, J.P.; Lehraus, I.; Mathewson, R.; May, J.; Price, M.; Schlater, D.; Tejessi, W.; Witzeling, W.

    1985-01-01

    The large time projection chambers (TPC) for particle track measurements have their electric drift field parallel to the magnetic field which is needed for the momentum measurement of the particles. Small field inhomogeneities of the order of epsilon times the main field cause large track distortions (coordinate displacements) of the order of epsilon times the driftlength. It is therefore important for every TPC to know the inhomogeneities very well. Laser rays have proven to be useful to study them. We report here on our experience with a TPC having a maximum drift length of 1.3 m

  18. Projected interaction picture of field operators and memory superoperators. A master equation for the single-particle Green's function in a Liouville space

    Grinberg, H.

    1983-11-01

    The projection operator method of Zwanzig and Feshbach is used to construct the time-dependent field operators in the interaction picture. The formula developed to describe the time dependence involves time-ordered cosine and sine projected evolution (memory) superoperators, from which a master equation for the interaction-picture single-particle Green's function in a Liouville space is derived. (author)

  19. Project studies

    Geraldi, Joana; Söderlund, Jonas

    2018-01-01

    Project organising is a growing field of scholarly inquiry and management practice. In recent years, two important developments have influenced this field: (1) the study and practice of projects have extended their level of analysis from mainly focussing on individual projects to focussing on micro......, and of the explanations of project practices they could offer. To discuss avenues for future research on projects and project practice, this paper suggests the notion of project studies to better grasp the status of our field. We combine these two sets of ideas to analyse the status and future options for advancing...... project research: (1) levels of analysis; and (2) type of research. Analysing recent developments within project studies, we observe the emergence of what we refer to as type 3 research, which reconciles the need for theoretical development and engagement with practice. Type 3 research suggests pragmatic...

  20. Rock stress measurements. Preparatory stage of the equipment development project

    Mononen, S.; Hakala, M.; Mikkola, P.

    2002-01-01

    In recent years the rock stress measurement methods used in Finland have been overcoring and hydraulic fracturing. There have been mainly two companies involved in these measurements, namely Suomen Malmi Oy (Smoy) and SwedPower AB. Smoy has done measurements for mines and for rock engineering projects, whereas SwedPower AB has mainly been involved in nuclear waste disposal investigations and conducted hydraulic fracturing measurements in deep boreholes. Smoy together with its partners started in February 2001 a project named JTM, which was a preliminary stage for a future project, which aims to develop a device most suitable for rock stress measurements in Finland. The partners in the project were HUT Rock Engineering, Posiva Oy, Saanio and Riekkola Oy, Gridpoint Finland Oy and Geopros Oy. Tekes, the National Technology Agency, provided almost half of the project funding. In the management group of the project were Pekka Mikkola (chairman) and Tero Laurila from Smoy, Pekka Saerkkae and Sakari Mononen (full-time researcher) from HUT, Aimo Hautojaervi (Posiva Oy), Erik Johansson (Saanio and Riekkola Oy), Matti Hakala (Gridpoint Finland Oy) and Heikki Haemaelaeinen (Geopros Oy). The aim of the JTM-project was to find out the needs for the development of a device most suitable for rock stress measurements in Finnish mines and rock engineering projects. During the project work was done to find out the range of rock stress measurement devices available, to find out the needs for measurements, and to get acquainted to the measurements done in Scandinavia. Also a report of the most suitable methods for Finnish rock conditions was done based on literature and on interviews of rock stress experts. Based on all the information collected during the project a clear picture of the needs for rock stress measurements in Finland could be formed and a preliminary plan of a future project was done. The aim of the suggested project is to build a device based on hydraulic fracturing

  1. Challenges of MTBE development from field butanes

    Williams, F.

    1991-01-01

    Tenneco Natural Gas Liquids has embarked on a new project to produce Methyl Teritiary Butyl Ether (MTBE) form butanes as have several others. The Clean Air Act will provide the impetus for even more of these plants in the future. In fact, butanes have the potential to go form a surplus product situation today to an important product in the near future. So what follows are our ideas about what the MTBE business looks like form the standpoint of a new producer getting things underway. This paper reports that there are roughly six areas where a potential producer of MTBE or Ethyl Tertiary Butyl Ether (ETBE) for that matter, should have concern. Your planning department should be aware of a source of feedstocks; have adequate storage planned; understand the technology involved and its related cost; be forearmed with an idea of location and its specific market opportunities; be prepared for significant environmental evaluation along with necessary contingency plans; and most importantly display a high degree of optimism as to future markets so as to minimize all of the aforementioned concerns

  2. Time for Decarbonization of Conservation and Development Projects? The Political Ecology of Carbon Projects

    Pierre L. Ibisch

    2015-01-01

    Full Text Available The globe's first carbon projects were designed and implemented approximately 20 years ago following scientific insights that emissions of greenhouse gases needed to be mitigated. Visible in some of these early projects were the important aspects of social governance and local benefit sharing. The projects promised to be a panacea to environmental, social and economic problems in remote rural areas of developing countries. However, it took another decade before a wave of hundreds of carbon projects were launched. Many of the projects were offered under the mechanism of REDD+ (Reducing Emissions from Deforestation and forest Degradation, plus the role of conservation, sustainable forest management and carbon enhancement, as well as under a variety of voluntary schemes and national programs, public-private partnerships, and forestry-based investment initiatives. As decision-makers prepare the Conference of the Parties of the United Nations Framework Convention on Climatic Change in Paris (COP21, Earthscan has released a book entitled `Carbon conflicts and forest landscapes in Africa', edited by Melissa Leach and Ian Scoones. According to the editors, the focus of the book is on what happens on the ground when carbon forestry projects arrive, what types of projects work, and, equally important, what doesn’t work.

  3. Cooperation and communication challenges in small-scale eHealth development projects.

    Petersen, Lone Stub; Bertelsen, Pernille; Bjørnes, Charlotte

    2013-12-01

    In eHealth development there is an increasing focus on user participation inspired by the information systems field of practice and research. There are, however, many other challenges in developing information systems that fit healthcare practices. One of these is the challenge of cooperation and communication in development projects that are initiated and managed by clinicians e.g. cooperating with IT professionals in 'bottom up' health informatics projects that have been initiated and are managed by healthcare professional project managers. The analysis and results are drawn from a qualitative case study on a systems development project that was managed by a local, non-technical, healthcare professional and the complex blend and interactions with the IT professionals in the phases of ideas, design, development, implementation, maintenance and distribution. We analyze the challenges of cooperation and communication using perspectives from information systems research and the concepts of 'language-games' and 'shared design spaces', and thereby exploring the boundaries between the different communication, practice and culture of the IT professionals and the healthcare professionals. There is a need to (a) develop a better understanding of the development process from the point of view of the 'user' and (b) tools for making technical knowledge explicit in the development process. Cooperative and communicative methods are needed that support and develop the shared design spaces between IT professionals and the clinical context in order to strengthen small-scale health information systems projects. Copyright © 2013 Elsevier Ireland Ltd. All rights reserved.

  4. Development of a regional LiDAR field plot strategy for Oregon and Washington

    Arvind Bhuta; Leah Rathbun

    2015-01-01

    The National Forest System (NFS) Pacific Northwest Region (R6) has been flying LiDAR on a per project basis. Additional field data was also collected in situ to many of these LiDAR projects to aid in the development of predictive models and estimate values which are unattainable through LiDAR data alone (e.g. species composition, tree volume, and downed woody material...

  5. Resource-constrained project scheduling problem: review of past and recent developments

    Farhad Habibi

    2018-01-01

    Full Text Available The project scheduling problem is both practically and theoretically of paramount importance. From the practical perspective, improvement of project scheduling as a critical part of project management process can lead to successful project completion and significantly decrease of the relevant costs. From the theoretical perspective, project scheduling is regarded as one of the in-teresting optimization issues, which has attracted the attention of many researchers in the area of operations research. Therefore, the project scheduling issue has been significantly evaluated over time and has been developed from various aspects. In this research, the topics related to Re-source-Constrained Project Scheduling Problem (RCPSP are reviewed, recent developments in this field are evaluated, and the results are presented for future studies. In this regard, first, the standard problem of RCPSP is expressed and related developments are presented from four as-pects of resources, characteristics of activities, type of objective functions, and availability level of information. Following that, details about 216 articles conducted on RCPSP during 1980-2017 are expressed. At the end, in line with the statistics obtained from the evaluation of previ-ous articles, suggestions are made for the future studies in order to help the development of new issues in this area.

  6. Rapid Response Risk Assessment in New Project Development

    Graber, Robert R.

    2010-01-01

    A capability for rapidly performing quantitative risk assessments has been developed by JSC Safety and Mission Assurance for use on project design trade studies early in the project life cycle, i.e., concept development through preliminary design phases. A risk assessment tool set has been developed consisting of interactive and integrated software modules that allow a user/project designer to assess the impact of alternative design or programmatic options on the probability of mission success or other risk metrics. The risk and design trade space includes interactive options for selecting parameters and/or metrics for numerous design characteristics including component reliability characteristics, functional redundancy levels, item or system technology readiness levels, and mission event characteristics. This capability is intended for use on any project or system development with a defined mission, and an example project will used for demonstration and descriptive purposes, e.g., landing a robot on the moon. The effects of various alternative design considerations and their impact of these decisions on mission success (or failure) can be measured in real time on a personal computer. This capability provides a high degree of efficiency for quickly providing information in NASA s evolving risk-based decision environment

  7. DEVELOPMENT OF THE STATE SUPPORT FORMS PROJECTS IN INDUSTRIAL BUILDING

    I. M. Meilanov

    2016-01-01

    Full Text Available Aim. The topicality of the research is stipulated by the objective necessity of the organizational and economic mechanism improvement of the state support projects of the industrial building. The aim of the research is the development of conceptual provisions and methodological foundations of financial projects creating conditions for economic growth of Russia based on the construction and putting into effect industrial objects.Methods. In the course of the research the system, subject-functional and structural approaches were implemented to solve the problems set widening the scope of the complex approach to assessment of the current operating mechanism of the state financial support of the projects and financial volume; to criteria stipulation of the most effective projects contest selection: to the search of the investment resources accumulation instrument into industrial building.Results. It is stipulated that state investment policy in industrial building mechanism oriented to define rational investment volumes and their branch, reproductive, technological and territorial structure; option of the building branch development priority; increase of the investment projects efficiency realization. The dynamics of the state support in the form of subsidies and budget investments into creation of the industrial building objects is analytically summarized. It is determined that the peculiarity of the modern state support projects of industrial building is transition from budget allocations distribution between branches and regions to selective and partial financing of specific investment projects on competitive basis. Some tactics of state and private partnership attracting private capital without losing strategic state control under systems and objects are defined. As an effective form of the industrial building support projects it is proposed to use a concession model form: projecting - building- financing- ownership - exploitation

  8. The SIMRAND methodology - Simulation of Research and Development Projects

    Miles, R. F., Jr.

    1984-01-01

    In research and development projects, a commonly occurring management decision is concerned with the optimum allocation of resources to achieve the project goals. Because of resource constraints, management has to make a decision regarding the set of proposed systems or tasks which should be undertaken. SIMRAND (Simulation of Research and Development Projects) is a methodology which was developed for aiding management in this decision. Attention is given to a problem description, aspects of model formulation, the reduction phase of the model solution, the simulation phase, and the evaluation phase. The implementation of the considered approach is illustrated with the aid of an example which involves a simplified network of the type used to determine the price of silicon solar cells.

  9. Research, design and development project Myoelectric Prosthesis of Upper Limb

    Galiano, L; Montaner, E; Flecha, A [Bioparx, J Hernandez 1101, Parana, ERios (Argentina)

    2007-11-15

    A Research Design and Development Project was developed of a myoelectric prosthesis for a pediatric patient presenting congenital amputation of the left forearm below the elbow. A multidisciplinary work-team was formed for this goal, in order to solve the several (/various) aspects regarding this project (mechanical, ergonomics, electronics, physical). The prosthesis as an electromechanical device was divided in several blocks, trying to achieve a focused development for each stage, acording to requisites. A mechanical prototype of the prothesis was designed and built along with the circuitry needed for EMG aquisition, control logic and drivers. Having acomplished the previuos stages, the project is now dealing with the definitions of the interface between the prosthesis and the patient, with promising perspectives.

  10. Research, design and development project Myoelectric Prosthesis of Upper Limb

    Galiano, L; Montaner, E; Flecha, A

    2007-01-01

    A Research Design and Development Project was developed of a myoelectric prosthesis for a pediatric patient presenting congenital amputation of the left forearm below the elbow. A multidisciplinary work-team was formed for this goal, in order to solve the several (/various) aspects regarding this project (mechanical, ergonomics, electronics, physical). The prosthesis as an electromechanical device was divided in several blocks, trying to achieve a focused development for each stage, acording to requisites. A mechanical prototype of the prothesis was designed and built along with the circuitry needed for EMG aquisition, control logic and drivers. Having acomplished the previuos stages, the project is now dealing with the definitions of the interface between the prosthesis and the patient, with promising perspectives

  11. Development of Entrepreneurship Competences from Project Based Learning Approaches

    Lidia SÁNCHEZ GONZÁLEZ

    2017-02-01

    Full Text Available A key issue for any educational institution is to train individuals in such a way that they participate efficiently in their context. The current context where learning is carried out is digital era. With this landscape, and taking into account the current socioeconomic situation, it is necessary to increase students’ employability. This requires that what is taught in educational institutions fits with companies’ requirements. In this sense one of most common companies’ requirement is that students have knowledge about how to develop a project from scratch. In order to address this issue, the present paper poses the application of a project based learning methodology. This methodology is applied in an experiment that comprises two academic years. During each year, the students should develop complete projects working as teams and obtain final products. In this way, it was possible to develop competences that can be interesting for companies and also to increment students’ motivation.

  12. Roadmap for biofertilizer development project at Malaysian Nuclear Agency

    Khairuddin Abdul Rahim; Ahmad Nazrul Abd Wahid; Phua Choo Kwai Hoe; Pauline Liew Woan Ying; Ahamad Sahali Mardi; Mat Rasol Awang

    2007-01-01

    This paper discusses the roadmap for the Biofertilizer Development Project conducted at the Malaysian Nuclear Agency (Nuclear Malaysia). The project started in 2003 and scheduled to end in 2008. Biofertilizer refers to living microorganisms or materials that contain living microorganisms that contributes to improvement in plant nutrition, soil fertility and crop productivity. The main components of the project are (a) biofertilizer substrate or carrier development, (b) biofertilizer inoculum development based on local indigenous microorganisms (c) biofertilizer product formulation and innovation, and (d) evaluation of efficiency of biofertilizer products on crops under different cropping systems, including under modern agriculture under soilless system. The above components may involve nuclear technology, viz, use of ionising radiation and the use of isotopic tracers. The paper also discusses local and international linkages, including with Forum for Nuclear Cooperation in Asia (FNCA) and the industry, and aspects of commercialisation and technology transfer. (Author)

  13. Development of advanced JGIS considering qualify management and project management

    Kawachi, Susumu; Ohi, Takao; Kawamura, Makoto; Ishihara, Yoshinao; Ebina, Takanori

    2008-03-01

    A system for managing and integrating the technical information of R and D was developed (JGIS: JAEA Geological Disposal Information Integration System). The subjects are to improve the usability as the system and the usability to record the information and the data in order to display the function of the system sufficiently and in order to enable the practical use of the system. In this study the aims are to display the function of JGIS and to enable the researchers as the users to recognize the significance of using JGIS. We built the conceptual design in order to implement the function of quality management and project management to JGIS. We considered that researchers could access the portal site of the research projects which were set as the WBS (Work Breakdown Structure) items and could confirm which WBS item the research project belonged to in the whole plan. We also considered that the research projects could be managed by using the conformity assessment sheets which were adopted for the quality management. The appendix contains the example of application of real projects to JGIS and the user's manual of JGIS (Example of a study of potential impact of natural phenomena). We demonstrated that researchers could confirm which WBS item the research project related to in JGIS and could manage the quality of the research projects by using the conformity assessment sheets in JGIS. (author)

  14. Incentive Mechanism of Micro-grid Project Development

    Yong Long

    2018-01-01

    Full Text Available Due to the issue of cost and benefit, the investment demand and consumption demand of micro-grids are insufficient in the early stages, which makes all parties lack motivation to participate in the development of micro-grid projects and leads to the slow development of micro-grids. In order to promote the development of micro-grids, the corresponding incentive mechanism should be designed to motivate the development of micro-grid projects. Therefore, this paper builds a multi-stage incentive model of micro-grid project development involving government, grid corporation, energy supplier, equipment supplier, and the user in order to study the incentive problems of micro-grid project development. Through the solution and analysis of the model, this paper deduces the optimal subsidy of government and the optimal cooperation incentive of the energy supplier, and calculates the optimal pricing strategy of grid corporation and the energy supplier, and analyzes the influence of relevant factors on optimal subsidy and incentive. The study reveals that the cost and social benefit of micro-grid development have a positive impact on micro-grid subsidy, technical level and equipment quality of equipment supplier as well as the fact that government subsidies positively adjust the level of cooperation incentives and price incentives. In the end, the validity of the model is verified by numerical analysis, and the incentive strategy of each participant is analyzed. The research of this paper is of great significance to encourage project development of micro-grids and to promote the sustainable development of micro-grids.

  15. REVIEW OF INTERNATIONAL PROJECTS IN А FIELD OF HUMAN MICROBIAL ECOLOGY AND CONSTRUCTION OF PROBIOTICS

    S. A. Starovoitova

    2013-06-01

    Full Text Available Modern huge and world-wide known projects concerning studying of human microbial ecology and construction of probiotics, particularly: Society for Microbial Ecology and Disease, Probiotics & Health Targeted Initiative of International Science and Technology Center (TI PROBIO ISTC, Human Microbiome Project of National Institutes of Health, MetaHIT Project (Metagenomics of the Human Intestinal Tract of European Commission, Human Metabolome Project of Canadian University of Alberta and some more else were characterized in the article. Brief historical information and reference to official sites of every discussed project were given. Main goals and tasks of every project were described. Short characteristic of discussed projects and also modern accessible results of researches were given. Importance of every examined project for widening scientific knowledge in the field of human microbial ecology and also for improvement and/or for construction of modern effective probiotics on basis of human normal intestinal microflora were paid attention. Close interaction of scientific data received by realization of every discussed project was shown.

  16. Cognitive Factors that Impact Learning in the Field: Observations from an REU Project on Precambrian Rocks of Yellowstone National Park

    Henry, D.; Mogk, D. W.; Goodwin, C.

    2011-12-01

    Field work requires cognitive processing on many different levels, and constitutes a powerful and important learning environment. To be effective and meaningful, the context of field work must be fully understood in terms of key research questions, earlier published work, regional geology, geologic history, and geologic processes. Scale(s) of observation and sample selection methods and strategies must be defined. Logistical decisions must be made about equipment needed, points of access, and navigation in the field. Professional skills such as field note-taking, measuring structural data, and rock descriptions must be employed, including appropriate use of field tools. Interpretations of geologic features in the field must be interpreted through recall of concepts from the geologic knowledge base (e.g. crystallization history of igneous rocks interpreted through phase diagrams). Field workers need to be able to self-monitor and self-regulate their actions (metacognitively), and make adjustments to daily plans as needed. The results of field work must be accurately and effectively communicated to other geoscientists. Personal and professional ethics and values are brought to bear as decisions are made about whether or not the work has been satisfactorily completed at a field site. And, all of this must be done against a back drop of environmental factors that affect the ability to do this work (e.g. inclement weather, bears, impassable landscapes). The simultaneous relevance of all these factors creates a challenging, but rewarding environment for learning on many different scales. During our REU project to study the Precambrian rocks in the back country of Yellowstone National Park (YNP), we considered these cognitive factors in designing our project curriculum. To reduce the "novelty space" of the project a website was developed that described the project goals and expected outcomes, introduced primary literature, and alerted students about the physical demands

  17. methanization of organic matters. Guide for project developers

    2015-02-01

    This document aims at informing potential project developers (farmers, local communities, industrials) all along the creation of a methanization unit. It precisely indicates administrative procedures required to complete a project. It first presents some generalities about methanization (matters and their performance, methanization cycle, biogas), describes methanization processes (dry and humid), and valorisation processes (co-generation, hot water production, gas injection into the public network), presents digestate characteristics, and discusses benefits and drawbacks of methanization. The different steps of a project management are then analysed. Additional procedures are indicated, and risks and traps of methanization projects are highlighted. The document comes along with a large number of appendices which can be documents released by professional or public bodies

  18. Meeting the challenges of developing LED-based projection displays

    Geißler, Enrico

    2006-04-01

    The main challenge in developing a LED-based projection system is to meet the brightness requirements of the market. Therefore a balanced combination of optical, electrical and thermal parameters must be reached to achieve these performance and cost targets. This paper describes the system design methodology for a digital micromirror display (DMD) based optical engine using LEDs as the light source, starting at the basic physical and geometrical parameters of the DMD and other optical elements through characterization of the LEDs to optimizing the system performance by determining optimal driving conditions. LEDs have a luminous flux density which is just at the threshold of acceptance in projection systems and thus only a fully optimized optical system with a matched set of LEDs can be used. This work resulted in two projection engines, one for a compact pocket projector and the other for a rear projection television, both of which are currently in commercialization.

  19. Kikori River basin project to sustain environment alongside development

    Price, J.B.; Power, A.P.; Henry, D.

    1994-01-01

    Protecting people and the environment is an essential design and operational criteria for the Kutubu Petroleum Development Project to minimize the physical, social and economic impacts on the local people and their environment in Papua New Guinea. This paper describes how Kutubu was implemented, and how World Wildlife Fund is assisting the neighboring communities to utilize their natural resources for long term benefit. The objectives and first year expectations of a three year integrated conservation and development project are identified, and the progress is summarized

  20. Sustainable Energy in Remote Indonesian Grids. Accelerating Project Development

    Hirsch, Brian [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Burman, Kari [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Davidson, Carolyn [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Elchinger, Michael [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Hardison, R. [Winrock International, Little Rock, AR (United States); Karsiwulan, D. [Winrock International, Little Rock, AR (United States); Castermans, B. [Winrock International, Little Rock, AR (United States)

    2015-06-30

    Sustainable Energy for Remote Indonesian Grids (SERIG) is a U.S. Department of Energy (DOE) funded initiative to support Indonesia’s efforts to develop clean energy and increase access to electricity in remote locations throughout the country. With DOE support, the SERIG implementation team consists of the National Renewable Energy Laboratory (NREL) and Winrock International’s Jakarta, Indonesia office. Through technical assistance that includes techno-economic feasibility evaluation for selected projects, government-to-government coordination, infrastructure assessment, stakeholder outreach, and policy analysis, SERIG seeks to provide opportunities for individual project development and a collective framework for national replication office.

  1. Barriers to clean development mechanism renewable energy projects in Mexico

    Lokey, Elizabeth

    2009-01-01

    Mexico is not reaching its full potential to capture benefits from clean development mechanism (CDM) projects because of its limited market for independent power producers (IPPs) and the barriers imposed on these entities by the state-run electric utility that controls most of the country's generation and transmission. This state-run entity has pursued CDM revenues only in isolated cases where international financial assistance was given because it is bound by law to pursue the least-cost generation option for its customers. Recent changes in Mexican legislation that provide incentives for renewable energy development could open the marketplace for these types of projects. (author)

  2. Hardware and Software Integration in Project Development of Automated Controller System Using LABVIEW FPGA

    Mohd Khairulezwan Abd Manan; Mohd Sabri Minhat; Izhar Abu Hussin

    2014-01-01

    The Field-Programmable Gate Array (FPGA) is a semiconductor device that can be programmed after manufacturing. Instead of being restricted to any predetermined hardware function, an FPGA allows user to program product features and functions, adapt to new standards, and reconfigure hardware for specific applications even after the product has been installed in the field, hence the name field-programmable. This project developed a control system using LabVIEW FPGA. LabVIEW FPGA is easier where it is programmed by using drag and drop icon. Then it will be integrated with the hardware input and output. (author)

  3. Overview of DOE's field screening technology development activities

    Frank, C.W.; Anderson, T.D.; Cooley, C.R.; Hain, K.E.; Lien, S.C.T.; Erickson, M.D.

    1991-01-01

    The Department of Energy (DOE) has recently created the Office of Environmental Restoration and Waste Management, into which it consolidated those activities. Within this new organization, the Office of Technology Development (OTD) is responsible for research, development, demonstration, testing, and evaluation (RDDT ampersand E) activities aimed at meeting DOE cleanup goals, while minimizing cost and risk. Site characterization using traditional drilling, sampling, and analytical methods comprises a significant part of the environmental restoration efforts in terms of both cost and time to accomplish. It can also be invasive and create additional pathways for spread of contaminants. Consequently, DOE is focusing on site characterization as one of the areas in which significant technological advances are possible which will decrease cost, reduce risk, and shorten schedules for achieving restoration goals. DOE is investing considerably in R ampersand D and demonstration activities which will improve the abilities to screen chemical, radiological, and physical parameters in the field. This paper presents an overview of the program objectives and status and reviews some of the projects which are currently underway in the area. 1 ref

  4. ALASKA OIL AND GAS EXPLORATION, DEVELOPMENT, AND PERMITTING PROJECT

    Richard McMahon; Robert Crandall; Chas Dense; Sean Weems

    2003-08-04

    The objective of this project is to eliminate three closely inter-related barriers to oil production in Alaska through the use of a geographic information system (GIS) and other information technology strategies. These barriers involve identification of oil development potential from existing wells, planning projects to efficiently avoid conflicts with other interests, and gaining state approvals for exploration and development projects. Each barrier is the result of either current labor-intensive methods or poorly accessible information. This project brings together three parts of the oil exploration, development, and permitting process to form the foundation for a more fully integrated information technology infrastructure for the State of Alaska. This web-based system will enable the public and other review participants to track permit status, submit and view comments, and obtain important project information online. By automating several functions of the current manual process, permit applications will be completed more quickly and accurately, and agencies will be able to complete reviews with fewer delays. The application will include an on-line diagnostic Coastal Project Questionnaire to determine the suite of permits required for a specific project. The application will also automatically create distribution lists based on the location and type of project, populate document templates for project review start-ups, public notices and findings, allow submission of e-comments, and post project status information on the Internet. Alaska has nearly one-quarter of the nation's supply of crude oil, at least five billion barrels of proven reserves. The American Association of Petroleum Geologists report that the 1995 National Assessment identified the North Slope as having 7.4 billion barrels of technically recoverable oil and over 63 trillion cubic feet of natural gas. From these reserves, Alaska produces roughly one-fifth of the nation's daily crude oil

  5. Open-Source Development Experiences in Scientific Software: The HANDE Quantum Monte Carlo Project

    J. S. Spencer

    2015-11-01

    Full Text Available The HANDE quantum Monte Carlo project offers accessible stochastic algorithms for general use for scientists in the field of quantum chemistry. HANDE is an ambitious and general high-performance code developed by a geographically-dispersed team with a variety of backgrounds in computational science. In the course of preparing a public, open-source release, we have taken this opportunity to step back and look at what we have done and what we hope to do in the future. We pay particular attention to development processes, the approach taken to train students joining the project, and how a flat hierarchical structure aids communication.

  6. The supervisor in the project-organized group work should participate in developing the students' project competencies

    Hansen, Søren

    2004-01-01

    The article demonstrates how the supervisor can facilitate development of competencies as an implicit part of supervising study projects.......The article demonstrates how the supervisor can facilitate development of competencies as an implicit part of supervising study projects....

  7. Feedback from uncertainties propagation research projects conducted in different hydraulic fields: outcomes for engineering projects and nuclear safety assessment.

    Bacchi, Vito; Duluc, Claire-Marie; Bertrand, Nathalie; Bardet, Lise

    2017-04-01

    In recent years, in the context of hydraulic risk assessment, much effort has been put into the development of sophisticated numerical model systems able reproducing surface flow field. These numerical models are based on a deterministic approach and the results are presented in terms of measurable quantities (water depths, flow velocities, etc…). However, the modelling of surface flows involves numerous uncertainties associated both to the numerical structure of the model, to the knowledge of the physical parameters which force the system and to the randomness inherent to natural phenomena. As a consequence, dealing with uncertainties can be a difficult task for both modelers and decision-makers [Ioss, 2011]. In the context of nuclear safety, IRSN assesses studies conducted by operators for different reference flood situations (local rain, small or large watershed flooding, sea levels, etc…), that are defined in the guide ASN N°13 [ASN, 2013]. The guide provides some recommendations to deal with uncertainties, by proposing a specific conservative approach to cover hydraulic modelling uncertainties. Depending of the situation, the influencing parameter might be the Strickler coefficient, levee behavior, simplified topographic assumptions, etc. Obviously, identifying the most influencing parameter and giving it a penalizing value is challenging and usually questionable. In this context, IRSN conducted cooperative (Compagnie Nationale du Rhone, I-CiTy laboratory of Polytech'Nice, Atomic Energy Commission, Bureau de Recherches Géologiques et Minières) research activities since 2011 in order to investigate feasibility and benefits of Uncertainties Analysis (UA) and Global Sensitivity Analysis (GSA) when applied to hydraulic modelling. A specific methodology was tested by using the computational environment Promethee, developed by IRSN, which allows carrying out uncertainties propagation study. This methodology was applied with various numerical models and in

  8. REDD+ readiness: early insights on monitoring, reporting and verification systems of project developers

    Joseph, Shijo; Sunderlin, William D; Verchot, Louis V; Herold, Martin

    2013-01-01

    A functional measuring, monitoring, reporting and verification (MRV) system is essential to assess the additionality and impact on forest carbon in REDD+ (reducing emissions from deforestation and degradation) projects. This study assesses the MRV capacity and readiness of project developers at 20 REDD+ projects in Brazil, Peru, Cameroon, Tanzania, Indonesia and Vietnam, using a questionnaire survey and field visits. Nineteen performance criteria with 76 indicators were formulated in three categories, and capacity was measured with respect to each category. Of the 20 projects, 11 were found to have very high or high overall MRV capacity and readiness. At the regional level, capacity and readiness tended to be highest in the projects in Brazil and Peru and somewhat lower in Cameroon, Tanzania, Indonesia and Vietnam. Although the MRV capacities of half the projects are high, there are capacity deficiencies in other projects that are a source of concern. These are not only due to limitations in technical expertise, but can also be attributed to the slowness of international REDD+ policy formulation and the unclear path of development of the forest carbon market. Based on the study results, priorities for MRV development and increased investment in readiness are proposed. (letter)

  9. Campus Eco Tours: An Integrative & Interactive Field Project for Undergraduate Biology Students

    Boes, Katie E.

    2013-01-01

    Outdoor areas within or near college campuses offer an opportunity for biology students to observe the natural world and apply concepts from class. Here, I describe an engaging and integrative project where undergraduate non-major biology students work in teams to develop and present professional "eco tours." This project takes place over multiple…

  10. The Ikhil Gas Project: developing the first commercial natural gas project north of the Arctic Circle

    Malin, G. [AltaGas Services Inc., AB (Canada)

    2001-07-01

    Development of the Ikhil Natural Gas Project by the Inuvialuit Petroleum Corporation in partnership with Enbridge and AltaGas Services are described in a step-by-step fashion. A minimum of 11 Bcf of recoverable natural gas reserves have been established to date. The Northwest Territories Power Corporation is committed under a 15-year take-or-pay contract to take the gas, and the Town of Inuvik also has a franchise agreement with the project owners for a 15-year period. Challenges faced and overcome in adapting to the regulatory process, the engineering problems that required special solutions (e.g. ice/snow roads, gravel pad to support wellhead and production facilities, reducing temperature of gas to avoid disturbing the permafrost, sand-padding pipeline to supplement high ice/content material), converting a diesel town to a natural gas town, and installing an underground distribution system in ground that is constantly shifting due to permafrost, are some of the examples discussed. Benefits accruing to local people and businesses during construction and the production phases of the project are described, along with details of an assessment and discussion of lessons learned after two years of operation. Overall, the project is considered to have been an engineering success. Financially, it is too early to judge, but it is expected that with economic development in Inuvik taking off, demand for natural gas and electricity will develop and justify the confidence of the developers.

  11. Interdisciplinary perspectives on dose limits in radioactive waste management : A research paper developed within the ENTRIA project

    Kalmbach, K.; Röhlig, K.-J.

    2016-01-01

    Within the ENTRIA project, an interdisciplinary group of scientists developed a research paper aiming at a synthesis of the technical, sociology of knowledge, legal, societal, and political aspects of dose limits within the field of radioactive waste management. In this paper, the ENTRIA project is

  12. On the Use of Safety Certification Practices in Autonomous Field Robot Software Development

    Mogensen, Johann Thor Ingibergsson; Schultz, Ulrik Pagh; Kuhrmann, Marco

    2015-01-01

    reactions or performance in malfunctioning systems, and influence industry regarding software development and project management. However, academia seemingly did not reach the same degree of utilisation of standards. This paper presents the findings from a systematic mapping study in which we study...... the state-of-the-art in developing software for safety-critical software for autonomous field robots. The purpose of the study is to identify practices used for the development of autonomous field robots and how these practices relate to available safety standards. Our findings from reviewing 49 papers show...... on the quest for suitable approaches to develop safety-critical software, awaiting appropriate standards for this support....

  13. DEVELOPMENT OF METHODOLOGY FOR THE CALCULATION OF THE PROJECT INNOVATION INDICATOR AND ITS CRITERIA COMPONENTS

    Mariya Vishnevskaya

    2017-12-01

    . Based on the fuzzy sets theory, a calculation of the “personnel” component is suggested on the basis of the analysis of the conformity factor of execution of potential project operations to the required competencies of the project manager. The suggested technology assessment as a part of a comprehensive indicator of the project innovation, unlike other technologies, considers the compliance of the project product characteristics with the consumers’ requirements and the options of a specific project. On the basis of ideal and matrix modelling, a mathematical model is obtained for determining the prospects of realizing consumer’s expectations regarding the project product. Practical implications. As a result of applying the suggested indicator of innovation, it is possible to obtain the information on the degree of the project innovativeness and risk tolerance, if the available resources are sufficient, whether the set of competencies of a project manager is in compliance with the project works, and whether the project product meets the requirements of the consumers. It is found that the innovation of projects can be considered as necessary and sufficient information for making optimal decisions. Simplicity, ease of use, efficiency, measurability, adaptability of innovation indicator extend its effectiveness in the field of the project management and provide the organization with a new tool for making appropriate management decisions. Application of the integrated project innovation indicator complements the classical methods of analysis of options, increases the effectiveness of the application of project management tools, especially at the stage of project selection to portfolio or program. The results of the research can be used for further development of scientific and methodological foundations to form a balanced system of indicators of innovative projects. The results implementation is a methodological and organizational basis for creating effective systems

  14. Rocket to Creativity: A Field Experience in Problem-Based and Project-Based Learning

    Dole, Sharon F.; Bloom, Lisa A.; Doss, Kristy Kowalske

    2016-01-01

    This article reports the impact of a field experience in problem-based (PBL) and project-based learning (PjBL) on in-service teachers' conceptions of experiential learning. Participants had been enrolled in a hybrid class that included an online component in which they learned about PBL and PjBL, and an experiential component in which they…

  15. Inventory of the patents and publications of FP7 projects in the field of ICT

    Jacob, J.; Sanditov, Bulat; Smirnov, Evgueni; Wintjes, Rene; Surpatean, A.; Notten, Ad; Sasso, Simone

    2015-01-01

    The inventory includes data on 295 patents and 18,158 publications resulting from FP7 funded projects in the field of ICT (ICT theme within Cooperation Programme and eInfrastructures within Capacities Programme). The period covered is 2007 - 2013. Patents and publications have been reported by

  16. Prototype of the ALICE Time Projection Chamber (TPC) Field-Cage

    2003-01-01

    The ALICE Time Projection Chamber (TPC) is the main particle tracking detector in ALICE. Charged particles crossing the gas of the TPC knock electons out of their atoms, which then drift in in the electric field. By measuring the arrival of electrons at the end of the chamber, the TPC will reconstruct the paths of the original charged particles.

  17. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 89

    NONE

    1998-04-01

    Summaries are presented for the DOE contracts related to supported research for thermal recovery of petroleum, geoscience technology, and field demonstrations in high-priority reservoir classes. Data included for each project are: title, contract number, principal investigator, research organization, beginning date, expected completion date, amount of award, objectives of the research, and summary of technical progress.

  18. Development and layout of a protocol for the field performance of concrete deck and crack sealers.

    2009-09-01

    The main objective of this project was to develop and layout a protocol for the long-term monitoring and assessment of the performance of concrete deck and crack sealants in the field. To accomplish this goal, a total of six bridge decks were chosen ...

  19. All projects related to | Page 584 | IDRC - International Development ...

    2007-09-09

    Project. Innovation is widely considered a major source of modern productivity. Start Date: September 9, 2007. End Date: May 6, 2010 ... Recent years have seen renewed recognition of the importance of science, technology and innovation (STI) for development. Start Date: January 26, 2007. End Date: October 25, 2009.

  20. Perceived Benefits of National Fadama Development Project III ...

    The study was conducted to appraise the perceived benefits of third national fadama development project III among rural farmers in Kwara state, Nigeria. A multi-stage random sampling technique was employed in selecting 225 Fadama III users as respondents. Data were collected by well trained fadama community ...

  1. All projects related to | Page 603 | IDRC - International Development ...

    2006-09-12

    Results. Displaying 6021 - 6030 of 6834. Influence of Information and Communication Technologies on the Job Market in Sénégal. Project. Information and communication technologies (ICTs) have become a key element in economic development and poverty reduction strategies in Sénégal. Start Date: September 12, 2006.

  2. All projects related to | Page 252 | IDRC - International Development ...

    Displaying 2511 - 2520 of 6834. Thinking Globally, Acting Locally: Preparing the Canadian Foreign Policy Community to Meet the Challenges of the World in 2020. Project. Development of an Ottawa-based Foreign Policy Network will help to bridge gaps, strengthen the foreign policy community in the national capital region ...

  3. All projects related to | Page 155 | IDRC - International Development ...

    Region: South Asia, North of Sahara, South of Sahara, North and Central America, South America, Central Asia, Far East Asia, Bangladesh, South Africa. Program: Think Tank Initiative. Total Funding: CA$ 692,000.00. Southern Voice on Post-Millennium Development Goals. Project. As 2015 approaches, the international ...

  4. Collaborative Writing to Enhance Academic Writing Development through Project Work

    Robayo Lun, Alma Milena; Hernandez Ortiz, Luz Stella

    2013-01-01

    Advanced students at university level struggle with many aspects of academic writing in English as a foreign language. The purpose of this article is to report on an investigation aimed at analyzing what collaborative writing through project work tells us about students' academic writing development at the tertiary level. The compositions written…

  5. Factors affecting the success of development projects : A behavioral perspective

    Aga, Deribe Assefa

    2016-01-01

    This dissertation sought to examine behavioral-related critical success factors in the context of Non-Governmental Organization (NGO) sector development projects in Ethiopia. The dissertation applied both a cross-sectional survey design and an experimental design in separate settings, and it is

  6. All projects related to | Page 289 | IDRC - International Development ...

    From farm to fork: Improving nutrition in the Caribbean. Project. Obesity rates are on the rise in the Caribbean. This is due in large part to the limited attention Caribbean countries have paid to local food production.They have relied instead on economic development through exports of plantation crops. Start Date: March 1, ...

  7. All projects related to | Page 616 | IDRC - International Development ...

    Program: Networked Economies. Total Funding: CA$ 232,973.00. Connecting Disadvantaged Youth to Quality Employment using ICTs (Latin America). Project. The Entra 21 program was created in 2001 by the International Youth Foundation (IYF) with support from the Inter-American Development Bank (IDB) and a number ...

  8. All projects related to | Page 390 | IDRC - International Development ...

    Region: North of Sahara, South of Sahara. Program: Networked Economies. Total Funding: CA$ 1,679,800.00. Panafrican Research Agenda on the Pedagogical Integration of ICTs. Project. Access to quality education for both young people and adults remains one of the most important development challenges in Africa.

  9. Hacking events. Project development practices and technology use at hackathons

    Richterich, Annika

    2017-01-01

    Hackathons are techno-creative events during which participants get together in a physical location. They may be hosted by civic communities, corporations or public institutions. Working individually or in teams, usually for several days, participants develop projects such as hardware or software

  10. All projects related to | Page 486 | IDRC - International Development ...

    2009-01-02

    Development Research to Empower All Mongolians through Information Communication Technology - DREAM IT. Project. Poor infrastructure, extreme climate, environmental degradation, political instability and a dispersed population are some of the challenges facing Mongolia. Start Date: January 2, 2009. End Date: ...

  11. All projects related to | Page 391 | IDRC - International Development ...

    2009-10-22

    ... to enhance the effectiveness of development projects in the Middle East and North Africa (MENA) that serve to enable the rural poor by sharing innovations, best practices and indigenous knowledge using information and communication technologies (ICTs) and knowledge management tools. Start Date: October 22, 2009.

  12. All projects related to | Page 304 | IDRC - International Development ...

    ... Economics, Environment, Evaluation, Food and Agriculture, Governance ... Topic: HUMAN RIGHTS, ACCESS TO HEALTH CARE ... This project aims to develop a set of indicators to assess the state, use and ... Micro, small and medium enterprises (MSMEs) are a source of livelihood for billions of poor people worldwide.

  13. International Barcode of Life Project : Engaging Developing Nations ...

    But, there is growing interest in barcoding on the part of diverse countries from around the world, as demonstrated at the Third International Barcode of Life conference held in Mexico, November 2009. This project will allow iBOL to expand the application of barcoding to developing countries. This will involve establishing ...

  14. All projects related to | Page 540 | IDRC - International Development ...

    Topic: ECONOMIC IMPLICATIONS, INTERNATIONAL TRADE, SOCIAL IMPLICATIONS, Economic and social development. Region: North of Sahara, South of Sahara, India. Program: Employment and Growth. Total Funding: CA$ 1,003,000.00. Impact of China on sub-Saharan Africa : Country Case Studies. Project. China is ...

  15. Impact of externally funded projects on development of research ...

    Impact of externally funded projects on development of research capability of national agricultural research system. S K Sharma. Abstract. No Abstract. Full Text: EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT · AJOL African Journals Online. HOW TO USE AJOL.

  16. Can enterprise architectures reduce failure in development projects?

    Janssen, M.F.W.H.A.; Klievink, B.

    2012-01-01

    Purpose: Scant attention has been given to the role of enterprise architecture (EA) in relationship to risk management in information system development projects. Even less attention has been given to the inter-organizational setting. The aim of this paper is to better understand this relationship.

  17. In the Way of Development : Indigenous Peoples, Life Projects and ...

    Couverture du livre In the Way of Development : Indigenous Peoples, Life Projects and Globalization. Editor(s):. Mario Blaser, Harvey A. Feit et Glenn ... New Cyber Policy Centres for the Global South. IDRC is pleased to announce the results of its 2017 call for proposals to establish Cyber Policy Centres in the Global South.

  18. All projects related to | Page 566 | IDRC - International Development ...

    2007-09-02

    Project. Brazil, Russia, India, China and South Africa (BRICS) have put innovation at the centre of their development strategies. Start Date: September 2, 2007. End Date: October 12, 2013. Topic: SCIENCE AND TECHNOLOGY POLICY, INNOVATIONS, Technological change. Region: Brazil, South America, China, Far East ...

  19. Project-Based Management Development: "The Volvo Story."

    Branch, John; Smith, Bryan

    1992-01-01

    A modular group project-based approach to management development was implemented by Volvo Concessionaires (United Kingdom) in partnership with training consultants. Ingredients of its success included top-level commitment, investment in diagnosis and tailoring, and use of company-specific case studies. (SK)

  20. Examining engineering costs for development of highway projects.

    2012-12-01

    The Texas Department of Transportation (TxDOT) commissioned a research team at Texas State University-San Marcos Department of Accounting to analyze the cost of projects by determining the cost of a preliminary engineering hour necessary to develop h...

  1. International Projects Development: From Decision Cycle to Overseas Reality.

    Franklyn, Gaston J.

    The major elements of the industry-based planning process can be successfully applied to the development and implementation of international projects in educational institutions. International education programs share the following fundamental structural elements with business and industry: they compete in the market place, and exist by managing…

  2. All projects related to | Page 674 | IDRC - International Development ...

    Topic: COMPUTERS, INFORMATION TECHNOLOGY, TEACHING AIDS, SCHOOLS, PRIMARY EDUCATION, CURRICULUM DEVELOPMENT. Region: Senegal, North of Sahara, South of Sahara. Total Funding: CA$ 449,240.00. Integration of ICTs into the Basic Curriculum in Primary Schools in Sénégal - Phase II. Project.

  3. All projects related to | Page 682 | IDRC - International Development ...

    2006-06-30

    This project will pilot the application and adaptation of the World Health Organization's 2005 Guidelines for the Safe Use of Wastewater, Excreta and Greywater in low-income urban settings in three developing countries in the Middle East and North Africa (MENA). Start Date: June 30, 2006. End Date: April 30, 2010.

  4. All projects related to | Page 679 | IDRC - International Development ...

    2006-05-29

    Learning Initiatives for Network Economies in Asia (LIRNEasia) : Building Capacity in ICT Policy. Project. It is now generally accepted that affordable, effective telecommunication services play an integral role in development. Start Date: May 29, 2006. End Date: March 30, 2008. Topic: INFORMATION TECHNOLOGY ...

  5. All projects related to | Page 174 | IDRC - International Development ...

    2013-03-01

    Project. Worldwide, economic growth models currently rely on carbon-based energies and the intensive use of natural resources. Start Date: March 1, 2013. End Date: June 1, 2015. Topic: Natural Resources, DEVELOPING COUNTRIES, ECONOMIC GROWTH, ENVIRONMENTAL POLICY, SURVEYS, INTERVIEWS, CASE ...

  6. Financing Options and Development Projects in the Nigerian Local ...

    This study is an investigation into the impact of Nigerian local government financing options on successful execution of development projects. Through the ordinary least square regression analysis, the study proved that though there is an established case of underfunding in the entire Nigerian local government system, the ...

  7. Impact of Personal Growth Projects on Leadership Identity Development

    Odom, Summer F.; Boyd, Barry L.; Williams, Jennifer

    2012-01-01

    Within personal leadership education courses, leadership educators should include experiences which help students develop themselves as leaders. In this article, the authors discuss results from a qualitative research study involving the analysis of Personal Growth Project (PGP) assignments in a personal leadership education collegiate course. The…

  8. All projects related to | Page 128 | IDRC - International Development ...

    This project seeks to provide capacity-building support to develop and implement the Information and Networks in Asia and Sub-Saharan Africa (INASSA) research program. Topic: ASIA, AFRICA SOUTH OF SAHARA, SOCIAL CHANGE, INFORMATION USERS, INFORMATION NETWORKS. Region: Central Asia, Far East ...

  9. All projects related to | Page 478 | IDRC - International Development ...

    Topic: Civil society, SOCIAL PARTICIPATION, Governance, Economic and social development. Region: North of Sahara, South of Sahara, Canada. Program: Foundations for Innovation. Total Funding: CA$ 250,000.00. African Network Operators Group (AfNOG) Training Workshops and Network Capacity Building. Project.

  10. All projects related to | Page 441 | IDRC - International Development ...

    2010-03-01

    Impact 2.0 : New Mechanisms for Linking Research and Policy. Project. Policy development is a complex process and there are many reasons why even the best arguments backed by solid research can fail to be heard or acted upon. Start Date: March 1, 2010. End Date: July 1, 2012. Topic: RESEARCH RESULTS, POLICY ...

  11. World Geography. The Port of Baltimore Workplace Skills Development Project.

    Walker, Sam

    This set of learning modules was developed during a project to deliver workplace literacy instruction to individuals employed in the more than 50 businesses related to the activities of the Port of Baltimore. It is intended to accomplish the following objectives: familiarize students with basic concepts of geography; give students knowledge of…

  12. All projects related to | Page 392 | IDRC - International Development ...

    Topic: PEACE RESEARCH, WAR, VIOLENCE, PSYCHOLOGICAL ASPECTS. Region: India, Ireland. Program: Governance and Justice. Total Funding: CA$ 527,600.00. Trauma, Development and Peacebuilding : Toward an Integrated Psychological Approach - Phase II. Project. Over the past decade, the peace, conflict and ...

  13. All projects related to | Page 35 | IDRC - International Development ...

    Region: Ghana. Program: Climate Change. Total Funding: CA$ 1,000,000.00. Strengthening territorial development and local management mechanisms in Paraguay. Project. Paraguay is a country with high levels of political and administrative centralization. Region: Paraguay, North and Central America, South America.

  14. All projects related to | Page 580 | IDRC - International Development ...

    This project seeks to foster an inclusive knowledge society by building capacity to apply information and communication technology (ICT) to human, social and economic development in the Middle East, ... Region: Middle East, Central Asia, Far East Asia, South Asia, Jordan, Lebanon, Malaysia, Syria, Yemen, Palestine.

  15. A Coordinated Decentralized Approach to Online Project Development

    Mykota, David

    2013-01-01

    With the growth rate of online learning outpacing traditional face-to-face instruction, universities are beginning to recognize the importance of strategic planning in its development. Making the case for online learning requires sound project management practices and an understanding of the business models on which it is predicated. The objective…

  16. Impacts of commercial agricultural development project (CADP) on ...

    The study evaluates the impacts of the Commercial Agricultural Development Project (CADP) on the empowerment of farmers in Kaduna State with specific reference to Lere, Giwa and Kubau Local Government Areas for the period of 2010-2016. Survey and documentary research design were employed and data sourced ...

  17. Inventory of cassava plant protection and development projects in ...

    A total of 303 cassava protection and development projects were identified of which about half are plant protection-oriented. Most activities on cassava protection have been centred on biological control and host plant resistance. The least activity has been on chemical control. The applicability of the collected database is ...

  18. Impact of Community Driven Development Project: A Case of ...

    This paper evaluates impact of Community Driven Development programme on infrastructure under National Fadama II Project in Oyo State Nigeria. Data were collected from two hundred and sixty-four farmers using multistage sampling procedures. Data were analyzed using descriptive statistics and infrastructure index.

  19. View all projects | Page 3 | IDRC - International Development ...

    Project. Sri Lanka is turning to aquaculture to diversify its rural economy and increase food production, particularly in the northern and eastern provinces, which are recovering from the civil conflict. Topic(s): AQUACULTURE, AGRICULTURAL EXTENSION, GENDER ANALYSIS, DEVELOPMENT COMMUNICATION, Gender.

  20. All projects related to | Page 495 | IDRC - International Development ...

    2008-01-01

    Evaluating the Impact of Free Access to Legislation over the Internet on the Competence of Lawyers. Project. IDRC's Information and Communication Technology for Development (ICT4D) has supported judicial information centres in Burkina Faso, Niger and Sénégal. Start Date: January 1, 2008. End Date: February 15, ...

  1. All projects related to | Page 6 | IDRC - International Development ...

    This pilot project is one of four pilots exploring the feasibility of a Think Heath Initiative, a prospective program that would support evidence-based policy engagement on the health-related Sustainable Development Goals (SDGs). Region: South Asia, Bangladesh, Bhutan, Sri Lanka, India, Nepal, Pakistan, Afghanistan.

  2. All projects related to | Page 388 | IDRC - International Development ...

    2009-03-18

    The Alternative Water Systems Project seeks to develop a point-of-use safe water system incorporating natural plant-derived coagulants, simple sari cloth filtration and chlorine disinfection for the control of waterborne diseases in South Asian slums. Start Date: March 18, 2009. End Date: June 19, 2012. Topic: WATER ...

  3. Development as an effective management system construction and investment projects

    Beloborodov Roman S.

    2011-02-01

    Full Text Available The article presents the material of the application of the conception «Development» as the effective methodology of the investment-construction project management within the framework the systems approach. Theoretical principles of the application of this conception are generalized and systematized based on the example of the creation of the low habitable complex.

  4. Materials Development Program: Ceramic Technology Project bibliography, 1984--1992

    1994-03-01

    The Ceramic Technology [for Advanced Heat Engines] Project was begun in 1983 to meet the ceramic materials needs of the companion DOE automotive engine program, the Advanced Gas Turbine (AGT) project, and the Heavy Duty Transport (low-heat-rejection, heavy-duty diesel) project. Goal is to develop an industry technology base for reliable and cost effective ceramics for applications in advanced automotive gas turbine and diesel engines. Research areas were identified following extensive input from industry and academia. Majority of research is done by industry (60%); work is also done at colleges and universities, in-house, and at other national laboratories and government agencies. In the beginning, reliability of ceramic components was the key issue. The reliability issues have largely been met and, at the present time, cost is the driving issue, especially in light of the highly cost-sensitive automotive market. Emphasis of the program has now been shifted toward developing cost-effective ceramic components for high-performance engines in the near-term. This bibliography is a compilation of publications done in conjunction with the Ceramic Technology Project since its beginning. Citations were obtained from reports done by participants in the project. We have tried to limit citations to those published and easily located. The end date of 1992 was selected.

  5. INSTITUTE OF REGULATORY IMPACT ASSESSMENT DEVELOPMENT OF EURASION UNION ENACTMENTS IN THE FIELD OF PUBLIC PROCUREMENT

    Elena Agapova

    2015-05-01

    Full Text Available Transformation of normative regulation of the public procurement system in the conditions of formation of the Eurasian Union is a very important tool in formation of common markets of goods and services. However, its impact on the development of entrepreneurial activity is ambiguous, which requires the development of regulatory impact assessment instruments of projects normative acts in the field of development of competition policy and procurement system of Eurasian Economy Union.

  6. All projects related to | Page 253 | IDRC - International Development ...

    Markets in developing countries are often marked by anti-competitive behaviour, concentrated market power, and low access for newcomers. ... Adding a social science perspective to the field of health policy and systems research can help developing countries address health problems in a more comprehensive way.

  7. Project Management in Development Aid Industry – Public vs. Private

    Simović Dragana

    2015-02-01

    Full Text Available This article examines the relationship between the type of a development aid implementing organisation (public or private and the quality of project management in development aid. The author begins with main public administration considerations - how public aid administration is different from private and furthermore, how particular sectoral characteristics of organisations influence the quality of the management process. The article combines empirical findings on the differences between the public and private sector with a complex setting of development aid and main success factors in development aid activity, in order to determine whether for-profit or public companies are more likely to achieve better project management processes. The article identifies some indices that favorise private companies, and outlines further necessary steps that should be taken in order to broaden the argumentation and confirm or reject this assertion

  8. Overview of technology developments in probiotic field

    Catherine Stanton

    2012-06-01

    Full Text Available Probiotics are ‘live microorganisms which, when administrated in adequate amounts, confer a health benefit on the host’ (FAO/WHO, 2001. This requirement, i.e. that the probiotic bacteria must be in viable form at the time of consumption, poses a number of technical challenges from food processing perspectives. Environmental stresses encountered during food processing include acid exposure during food fermentations, extremes in temperatures encountered during drying processes, in addition to oxidative, osmotic, and food matrix stresses. Furthermore, the ingested bacteria must remain viable during gastric transit, to reach the site of action in viable form to exert the probiotic effects. This imposes further stresses, as the gastrointestinal tract is naturally designed to impede the passage of microorganisms with low pH encountered in the stomach and the detergent-like properties of bile encountered in the duodenum. A number of approaches have been investigated in order to minimise the damage caused by exposure to such stresses experienced by probiotics during food processing and gastric transit. Approaches for protection of probiotic viability during food processing and shelf life include manipulation of bacterial cell physiology, application of prelethal stress to the cultures during cell preparation, selection of appropriate drying conditions, and optimisation of reconstitution conditions after drying. Furthermore, probiotic viability losses can be minimised by selection of appropriate food carriers for their delivery to the intestine. In this respect, the composition and physical nature of the food matrix can have profound effects on the stability of live probiotics during gastric transit. Encapsulation of probiotics is another approach to positively affect viability of probiotics in some matrices. Furthermore, it is important to understand the mechanisms underlying bacterial survival in hostile environments in order to develop efficacious

  9. Field Verification Project for Small Wind Turbines, Quarterly Report: April - June 2001; 2nd Quarter, Issue No.5

    2002-04-01

    This newsletter provides a brief overview of the Field Verification Project for Small Wind Turbines conducted out of the NWTC and a description of current activities. The newsletter also contains case studies of current projects.

  10. Field Verification Project for Small Wind Turbines Quarterly Report; July-September 2001, 3rd Quarter, Issue#6

    2003-04-01

    This newsletter provides a brief overview of the Field Verification Project for Small Wind Turbines conducted at the NWTC and a description of current activities. The newsletter also contains case studies of current projects.

  11. Environmental impacts of dispersed development from federal infrastructure projects.

    Southerland, Mark T

    2004-06-01

    Dispersed development, also referred to as urban growth or sprawl, is a pattern of low-density development spread over previously rural landscapes. Such growth can result in adverse impacts to air quality, water quality, human health, aquatic and terrestrial ecosystems, agricultural land, military training areas, water supply and wastewater treatment, recreational resources, viewscapes, and cultural resources. The U.S. Environmental Protection Agency (U.S. EPA) is charged with protecting public health and the environment, which includes consideration of impacts from dispersed development. Specifically, because federal infrastructure projects can affect the progress of dispersed development, the secondary impacts resulting from it must be assessed in documents prepared under the National Environmental Policy Act (NEPA). The Council on Environmental Quality (CEQ) has oversight for NEPA and Section 309 of the Clean Air Act requires that U.S. EPA review and comment on federal agency NEPA documents. The adverse effects of dispersed development can be induced by federal infrastructure projects including transportation, built infrastructure, modifications in natural infrastructure, public land conversion and redevelopment of properties, construction of federal facilities, and large traffic or major growth generation developments requiring federal permits. This paper presents an approach that U.S. EPA reviewers and NEPA practitioners can use to provide accurate, realistic, and consistent analysis of secondary impacts of dispersed development resulting from federal infrastructure projects. It also presents 24 measures that can be used to mitigate adverse impacts from dispersed development by modifying project location and design, participating in preservation or restoration activities, or informing and supporting local communities in planning.

  12. Programmes and projects for high-temperature reactor development

    Bogusch, Edgar; Hittner, Dominique

    2009-01-01

    An increasing attention has to be recognised worldwide on the development of High-Temperature Reactors (HTR) which has started in Germany and other countries in the 1970ies. While pebble bed reactors with spherical fuel elements have been developed and constructed in Germany, countries such as France, the US and Russia investigated HTR concepts with prismatic block-type fuel elements. The concept of a modular HTR formerly developed by Areva NP was an essential basis for the HTR-10 in China. A pebble bed HTR for electricity production is developed in South Africa. The construction is planned after the completion of the licensing procedure. Also the US is planning an HTR under the NGNP (Next Generation Nuclear Plant) Project. Due to the high temperature level of the helium coolant, the HTR can be used not only for electricity production but also for supply of process heat. Including its inherent safety features the HTR is an attractive candidate for heat supply to various types of plants e.g. for hydrogen production or coal liquefactions. The conceptual design of an HTR with prismatic fuel elements for the cogeneration of electricity and process heat has been developed by Areva NP. On the European scale the HTR development is promoted by the RAPHAEL (ReActor for Process heat, Hydrogen And ELectricity generation) project. RAPHAEL is an Integrated Project of the Euratom 6th Framework Programme for the development of technologies towards a Very High-Temperature Reactor (VHTR) for the production of electricity and heat. It is financed jointly by the European Commission and the partners of the HTR Technology Network (HTR-TN) and coordinated by Areva NP. The RAPHAEL project not only promotes HTR development but also the cooperation with other European projects such as the material programme EXTREMAT. Furthermore HTR technology is investigated in the frame of Generation IV International Forum (GIF). The development of a VHTR with helium temperatures above 900 C for the

  13. Project-based faculty development for e-learning.

    Vyas, Rashmi; Faith, Minnie; Selvakumar, Dhayakani; Pulimood, Anna; Lee, Mary

    2016-12-01

    The Christian Medical College, Vellore, in collaboration with Tufts University, Boston, conducted an advanced workshop in e-learning for medical faculty members in India. E-learning can enhance educational reforms for today's computer-literate generation, and keep faculty members up to speed in a rapidly changing world. The purpose of this paper is to report on the design and evaluation of a project-based faculty member development programme focused on developing faculty members as educators and as peer trainers who can use e-learning for educational reforms. During a 2-day workshop, 29 participants in groups of two or three developed 13 e-learning projects for implementation in their institutions. Evaluation of the workshop was through written feedback from the participants at the end of the workshop and by telephone interview with one participant from each project group at the end of one year. Content analysis of qualitative data was perfomed. The participants reported that they were motivated to implement e-learning projects and recognised the need for and usefulness of e-learning. The majority of projects (10 out of 13) that were implemented 'to some extent' or 'to a great extent' faced challenges with a lack of resources and administrative support, but faculty members were able to overcome them. E-learning can enhance educational reforms for today's computer-literate generation IMPLICATIONS: Designing feasible e-learning projects in small groups and obtaining hands-on experience with e-learning tools enhance the effectiveness of subsequent implementation. To successfully incorporate e-learning when designing educational reforms, faculty member training, continuing support and infrastructure facilities are essential. © 2016 John Wiley & Sons Ltd.

  14. R+D project KEWA. Cooperative development of economically efficient applications for environment, traffic and neighbouring fields in new administrative structures. Phase III 2007/08; F+E-Vorhaben KEWA. Kooperative Entwicklung wirtschafticher Anwendungen fuer Umwelt, Verkehr und benachbarte Bereiche in neuen Verwaltungsstrukturen. Phase III 2007/08

    Mayer-Foell, R.; Keitel, A.; Geiger, W. (eds.)

    2008-07-15

    The contribution to the R+D project 'KEWA - Cooperative development of economically efficient applications for environment, traffic and neighbouring fields in new administrative structures. Phase III 2007/08' contains the following contributions: (a) INSPIRE-GeoZG - Realisation of the INSPIRE regulation by means of the planned geo data access law of the Federal Government; (b) RIPS-GDI-AAA - Realisation of the CONCEPTION RIPS 2006 under consideration of the geo data infrastructure Baden-Wuerttemberg and of the AAA concepts of the administration of measurement; (c) RIPS-MDK - Spatial information system and planning system Baden-Wuerttemberg for the IuK group country/municipalities - RIPS metadata profile and further development - MDK; (d) disy Cadenza/GISterm WE - Further development of a platform for reports, evaluations and GIS as well as their applications in the Federal Government and countries; (e) disy Cadenza/GISterm NF - New special applications on the basis of Cadenza and GISterm - scope of special applications; (f) Environmental portals of the country - Networking of information in the environmental portals of Baden-Wuerttemberg, Sachsen-Anhalt and Thuringia under employment of a commercial search machine; (g) Topic park - Extension of the environmental communication platform by multimedial functionalities and contents of the Bodenseeweb; (h) FADO BW - Development of a fundamental version for a new management of special documents in the environmental information system Baden-Wuerttemberg; (i) BodenseeOnline -Interconnected research projects for an information system for the prediction of the hydrodynamics and water quality of lakes by the example of the Bodensee; (j) WaterFrame registered - Modern water information systems by cooperation of Baden-Wuerttemberg, Thuringia and Bavaria at specialized and technical level; (k) TrIS - New development of the drinking water information system Baden-Wueerttemberg; (l) FLIWAS-LE - Country-wide introduction

  15. Development of a biogas planning tool for project owners

    Fredenslund, Anders Michael; Kjær, Tyge

    are considered: Combined heat and power and natural gas grid injection. The main input to the model is the amount and types of substrates available for anaerobic digestion. By substituting the models’ default values with more project specific information, the model can be used in a biogas projects later phases......A spreadsheet model was developed, which can be used as a tool in the initial phases of planning a centralized biogas plant in Denmark. The model assesses energy production, total plant costs, operational costs and revenues and effect on greenhouse gas emissions. Two energy utilization alternatives...

  16. The design and development of Project Warrior equipment

    Thompson, V.R.; Jerram, K.

    1987-01-01

    The project Warrior standing for welding and repair robot in Oldbury reactors is the culmination of more than 7 years of conceptual thinking, research, development design and manufacture. The tile encompasses the whole project which includes a work performing manipulator, serving manipulator, the manipulators control system and consoles, a welding head and rangefinder with its associated control system and consoles and a large amount of auxiliary equipment. The system at the forefront of today's technology has been manufactured to carry out remote welding in nuclear reactors, on plate with an oxide covering of up to 200 microns

  17. Deflection tomography of a complex flow field based on the visualization of projection array

    Zhang Bin; Miao Zhanli, E-mail: zb-sh@163.com [College of Electromechanical Engineering, Qingdao University of Science and Technology, Qingdao, Shandong 266061 (China)

    2011-02-01

    Tomographic techniques are used for the investigation of complex flow fields by means of deflectometric methods. A new deflection tomographic setup for obtaining an array of multidirectional deflectograms is presented. Deflection projections in different angles of view can be captured synchronously in same optical path condition and arranged on the camera in two rows with three views in each row. Tikhonov regularization method is used to reconstruct temperature distribution from deflectometric projection data. The conjugate gradient method is used to compute the regularized solution for the least-square equations. The asymmetric flame temperature distribution in the horizontal section was reconstructed from limited view angle projections. The experimental results of reconstruction from real projection data were satisfactory when compared with the direct thermocouple measurements.

  18. Influence of gap length on the field increase factor β of an electrode projection (whisker)

    Miller, H.C.

    1984-01-01

    β, the increase of the macroscopic electric field at the tip of a projection, varies with the gap length. The sign and magnitude of this variation depends upon how the gap length is defined. If gap length is defined as x, the distance from the projection tip to the opposing electrode, then β is a strong function of x and may be approximated by β(x) = β/sub infinity/x/(x+h) [h = projection height] in the region where x/h>10/β/sub infinity/. If gap length is defined as d, the interelectrode distance ignoring the projection, then β is a weak function of d and may be set equal to β/sub infinity/ in the region d/h>2

  19. Soil spectral measurements in the field: problems and solutions in light of the GEO-CARDEL project

    Dor, E. Ben; Granot, Amihai

    2017-09-01

    The GEO-CRADEL project aims to establish several knowhow for GEO applications. One of them is food security in which soil spectroscopy plays a major role. To that end we had developed a new assembly for measuring surface reflectance in the field. This was done in order to fill the gap between laboratory and field soil spectral measurements. This device, named SoilPRO (SP) can be connected to any field spectrometer fiber's tip and used to measure representative and undisturbed surfaces of different soil types. The SoilPRO's performance was evaluated against laboratory measurements under optimal conditions and demonstrated high performance in the field. As the SP measurement is not dependent on main factors such as the sun's radiation, atmospheric variations, operator stability or measurement geometry, and it does not disturb the surface being measured, its measurement can be used with laboratory soil spectral data (SSL). To that end the SSL that is generated under the GEO-CARDEL project is now can be used for agro- application in the field.

  20. Remedial investigation sampling and analysis plan for J-Field, Aberdeen Proving Ground, Maryland: Volume 2, Quality Assurance Project Plan

    Prasad, S.; Martino, L.; Patton, T.

    1995-03-01

    J-Field encompasses about 460 acres at the southern end of the Gunpowder Neck Peninsula in the Edgewood Area of APG (Figure 2.1). Since World War II, the Edgewood Area of APG has been used to develop, manufacture, test, and destroy chemical agents and munitions. These materials were destroyed at J-Field by open burning and open detonation (OB/OD). For the purposes of this project, J-Field has been divided into eight geographic areas or facilities that are designated as areas of concern (AOCs): the Toxic Burning Pits (TBP), the White Phosphorus Burning Pits (WPP), the Riot Control Burning Pit (RCP), the Robins Point Demolition Ground (RPDG), the Robins Point Tower Site (RPTS), the South Beach Demolition Ground (SBDG), the South Beach Trench (SBT), and the Prototype Building (PB). The scope of this project is to conduct a remedial investigation/feasibility study (RI/FS) and ecological risk assessment to evaluate the impacts of past disposal activities at the J-Field site. Sampling for the RI will be carried out in three stages (I, II, and III) as detailed in the FSP. A phased approach will be used for the J-Field ecological risk assessment (ERA).