  1. Transitioning from operations to environmental restoration: Startup of the Fernald Environmental Restoration Management Contract

    International Nuclear Information System (INIS)

    Little, C.C.; Kozlowski, D.R.

    1993-10-01

    This paper will present a description of the program undertaken by the Fernald Environmental Restoration Management Contractor (ERMC) to effect a transition from operation of the Fernald site by the past M ampersand O contractor, WEMCO, to DOE's new mission and contractual approach focussed on site remediation. This transition, on a first of its kind contract, represented a significant, proactive approach on the part of DOE to pursue the clean up of its weapon's production facilities in a faster, more cost-effective manner. The paper will discuss the formal transition readiness review process and the lessons teamed by DOE and the contractor during transition. The oral presentation will be shared by both authors with one half of the time allocated to the transition readiness demonstration process and one half to the lessons learned. The objective of having a Department of Energy (DOE) Headquarters representative participate in the transition to the first ERMC was to develop a handbook to assist other sites proceeding with the ERMC concept, such as the Richland Operations Office, and to develop a lessons learned document. Because a lessons learned report is available separately, only those more significant lessons learned are highlighted in this paper

  2. Identifying environmental safety and health requirements for the Fernald Environmental Restoration Management Corporation

    International Nuclear Information System (INIS)

    Beckman, W.H.; Cossel, S.C.; Alhadeff, N.; Lindamood, S.B.; Beers, J.A.

    1994-01-01

    This presentation will describe the Fernald Environmental Restoration Management Corporation's (FERMCO) Standards/Requirements Identification Documents (S/RlDs) Program, the unique process used to implement it, and the status of the program. We will also discuss the lessons learned as the program was implemented. The Department of Energy (DOE) established the Fernald site to produce uranium metals for the nation's defense programs in 1953. In 1989, DOE suspended production and, in 1991, the mission of the site was formally changed to one of environmental cleanup and restoration. The site was renamed the Fernald Environmental Management Project (FEMP). FERMCO's mission is to provide safe, early, and least-cost final clean-up of the site in compliance with all regulations and commitments. DOE has managed nuclear facilities primarily through its oversight of Management and Operating contractors. Comprehensive nuclear industry standards were absent when most DOE sites were first established, Management and Operating contractors had to apply existing non-nuclear industry standards and, in many cases, formulate new technical standards. Because it was satisfied with the operation of its facilities, DOE did not incorporate modern practices and standards as they became available. In March 1990, the Defense Nuclear Facilities Safety Board issued Recommendation 90-2, which called for DOE to identify relevant standards and requirements, conduct adequacy assessments of requirements in protecting environmental, public, and worker health and safety, and determine the extent to which the requirements are being implemented. The Environmental Restoration and Waste Management Office of DOE embraced the recommendation for facilities under its control. Strict accountability requirements made it essential that FERMCO and DOE clearly identify applicable requirements necessary, determine the requirements' adequacy, and assess FERMCO's level of compliance

  3. Configuration management at an environmental restoration DOE facility (Fernald)

    International Nuclear Information System (INIS)

    Beckett, C.; Pasko, W.; Kupinski, T.

    1994-01-01

    This report contains information about a meeting held to discuss the decontamination and decommissioning of the Fernald site in Ohio. This site contains two major types of waste. First is the legacy waste. This waste consists of the wastes which were left over from production which is stored in various drums and containers across the site. Second is the waste generated from the remedial activities

  4. Meeting the requirements for a DOE environmental restoration project. The Fernald strategy

    International Nuclear Information System (INIS)

    Vanoss, R.L.; Risenhoover, G.M.

    1994-01-01

    Environmental Restoration (ER) of five Operable Units (OU) at Fernald Environmental Management Project (FEMP) includes compliance with the requirements of Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), Resource Conservation Recovery Act (RCRA), National Environmental Policy Act (NEPA), and DOE Orders. Each regulatory driver has differing procedural requirements for documenting calculations, decisions, and actions involved in site cleanup. Integration of documentation and avoidance of duplication can save time and money. Such savings are being achieved by OU specific application of supporting studies, revised procedures, and guidance documents. Each OU is seeking appropriate opportunities to produce single documents that simultaneously fulfill the important requirements of the other regulations and DOE orders. These opportunities are evaluated at all phases of decision making, remedial design, and remedial action. Three essential processes precede environmental restoration/remedial action at a DOE site/project: 1. Completion of decision-making documents required by governing or applicable statutes. 2. Completion of important scientific and engineering analyses of remedial alternatives, and design and implementation of the remedial solution established in the CERCLA Record of Decision (ROD). 3. Preparation of DOE-mandated documentation to record engineering evaluations and cost estimates required for budgeting, decision making, and project management. Methodology and requirements for each process have developed from long, successful practice, but independently of each other. FERMCO, as new DOE contractor at Fernald and first Environmental Restoration Management Contractor (ERMC), is committed to a process of Continuous Performance Improvement (CPI). A major reevaluation of documentation and processes for support of environmental decision-making and design of cleanup activities to remediate the five OUs at the FEMP is being undertaken

  5. Environmental data management at Fernald

    International Nuclear Information System (INIS)

    Jones, B.W.; Williams, J.

    1994-01-01

    FERMCO supports DOE's ongoing initiatives for the continuous improvement of site restoration through the development and application of innovative technologies. A major thrust of FERMCO's efforts has been the enhancement of environmental data management technology for the site. The understanding of environmental data is the fundamental basis for determining the need for environmental restoration, developing and comparing remedial alternatives, and reaching a decision on how to clean up a site. Environmental data management at Fernald is being focused on two major objectives: to improve the efficiency of the data management process, and to provide a better understanding of the meaning of the data at the earliest possible time. Environmental data at Fernald is typically a soil or groundwater sample collected by one of the field geologists. These samples are then shipped to one or more laboratories for analysis. After the analyses are returned from the laboratories the data are reviewed and qualified for usability. The data are then used by environmental professionals for determining nature and extent of contamination. Additionally, hazardous waste materials whether generated during production or during cleanup, may be sampled to characterize the waste before shipment or treatment. The data management process, which uses four major software systems, is presented graphically

  6. 2015 Site Environmental Report Fernald Preserve

    Energy Technology Data Exchange (ETDEWEB)

    Hertel, Bill [Navarro Research and Engineering, Oak Ridge, TN (United States); Hooten, Gwen [US Department of Energy, Washington, DC (United States)

    2016-05-01

    The Fernald Preserve 2015 Site Environmental Report provides stakeholders with the results from the Fernald, Ohio, Site’s environmental monitoring programs for 2015; a summary of the U.S. Department of Energy’s (DOE’s) activities conducted onsite; and a summary of the Fernald Preserve’s compliance with the various environmental regulations, compliance agreements, and DOE policies that govern site activities. This report has been prepared in accordance with the “Integrated Environmental Monitoring Plan,” which is Attachment D of the Comprehensive Legacy Management and Institutional Controls Plan (LMICP) (DOE 2016). Remediation of the Fernald Preserve has been successfully completed with the exception of the groundwater. During 2015, activities at the Fernald Preserve included: environmental monitoring activities related to direct radiation, groundwater, and surface water; ecological restoration monitoring and maintenance as well as inspections, care, and monitoring of the site and the OSDF to ensure that provisions of the LMICP are fully implemented; OSDF leak detection monitoring and collection, monitoring, and treatment of leachate from the OSDF; extraction, monitoring, and treatment of contaminated groundwater from the Great Miami Aquifer (Operable Unit 5); ongoing operation of the Fernald Preserve Visitors Center, associated outreach, and educational activities; and monitoring as specified in the site’s National Pollutant Discharge Elimination System (NPDES) permit. Environmental monitoring programs were developed to ensure that the remedy remains protective of the environment. The requirements of these programs are described in detail in the LMICP and reported in this Site Environmental Report.

  7. 1992 Fernald Site Environmental Report

    International Nuclear Information System (INIS)

    1993-06-01

    The Fernald site is a Department of Energy (DOE) owned facility that produced high-quality uranium metals for military defense for nearly 40 years. DOE suspended production at the Fernald site in 1989 and formally ended production in 1991. Although production activities have ceased, the site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. This report covers the reporting period from January 1, 1992, through December 31, 1992, with the exception of Chapter Three, which provides information from the first quarter of 1993 as well as calendar year 1992 information. This 1992 report provides the general public as well as scientists and engineers with the results from the site's ongoing Environmental Monitoring Program. Use included in this report are summary data of the sampling conducted to determine if the site complies with DOE, US Environmental Protection Agency (USEPA), and Ohio EPA (OEPA) requirements. Finally, this report provides general information on the major waste management and environmental restoration activities during 1992

  8. 1992 Fernald Site Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    The Fernald site is a Department of Energy (DOE) owned facility that produced high-quality uranium metals for military defense for nearly 40 years. DOE suspended production at the Fernald site in 1989 and formally ended production in 1991. Although production activities have ceased, the site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. This report covers the reporting period from January 1, 1992, through December 31, 1992, with the exception of Chapter Three, which provides information from the first quarter of 1993 as well as calendar year 1992 information. This 1992 report provides the general public as well as scientists and engineers with the results from the site`s ongoing Environmental Monitoring Program. Use included in this report are summary data of the sampling conducted to determine if the site complies with DOE, US Environmental Protection Agency (USEPA), and Ohio EPA (OEPA) requirements. Finally, this report provides general information on the major waste management and environmental restoration activities during 1992.

  9. 2015 Site Environmental Report Fernald Preserve

    International Nuclear Information System (INIS)

    Hertel, Bill; Hooten, Gwen

    2016-01-01

    The Fernald Preserve 2015 Site Environmental Report provides stakeholders with the results from the Fernald, Ohio, Site's environmental monitoring programs for 2015; a summary of the U.S. Department of Energy's (DOE's) activities conducted onsite; and a summary of the Fernald Preserve's compliance with the various environmental regulations, compliance agreements, and DOE policies that govern site activities. This report has been prepared in accordance with the ''Integrated Environmental Monitoring Plan,'' which is Attachment D of the Comprehensive Legacy Management and Institutional Controls Plan (LMICP) (DOE 2016). Remediation of the Fernald Preserve has been successfully completed with the exception of the groundwater. During 2015, activities at the Fernald Preserve included: environmental monitoring activities related to direct radiation, groundwater, and surface water; ecological restoration monitoring and maintenance as well as inspections, care, and monitoring of the site and the OSDF to ensure that provisions of the LMICP are fully implemented; OSDF leak detection monitoring and collection, monitoring, and treatment of leachate from the OSDF; extraction, monitoring, and treatment of contaminated groundwater from the Great Miami Aquifer (Operable Unit 5); ongoing operation of the Fernald Preserve Visitors Center, associated outreach, and educational activities; and monitoring as specified in the site's National Pollutant Discharge Elimination System (NPDES) permit. Environmental monitoring programs were developed to ensure that the remedy remains protective of the environment. The requirements of these programs are described in detail in the LMICP and reported in this Site Environmental Report.

  10. Fernald Preserve 2015 Site Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    Voisard, Karen [Navarro Research and Engineering, Oak Ridge, TN (United States); Smiley, Sue [U.S. Department of Energy Office of Legacy Management, Washington, DC (United States)

    2016-05-01

    The Fernald Preserve 2015 Site Environmental Report provides stakeholders with the results from the Fernald, Ohio, Site’s environmental monitoring programs for 2015; a summary of the U.S. Department of Energy’s (DOE’s) activities conducted onsite; and a summary of the Fernald Preserve’s compliance with the various environmental regulations, compliance agreements, and DOE policies that govern site activities. This report has been prepared in accordance with the “Integrated Environmental Monitoring Plan,” which is Attachment D of the Comprehensive Legacy Management and Institutional Controls Plan (LMICP) (DOE 2016).

  11. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE`s Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES&H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report.

  12. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    International Nuclear Information System (INIS)

    1993-04-01

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE's Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES ampersand H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report

  13. Fernald Environmental Management Project 1995 site environmental report summary

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    This report summarizes the 1995 Site Environmental Report for the Fernald site. It describes the Fernald site mission, exposure pathways, and environmental standards and guidelines. An overview is presented of the impact these activities have on the local environment and public health. Environmental monitoring activities measure and estimate the amount of radioactive and nonradioactive materials that may leave the site and enter the surrounding environment.

  14. Fernald Environmental Management Project 1995 site environmental report summary

    International Nuclear Information System (INIS)

    1996-06-01

    This report summarizes the 1995 Site Environmental Report for the Fernald site. It describes the Fernald site mission, exposure pathways, and environmental standards and guidelines. An overview is presented of the impact these activities have on the local environment and public health. Environmental monitoring activities measure and estimate the amount of radioactive and nonradioactive materials that may leave the site and enter the surrounding environment

  15. The process of life-cycle cost analysis on the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Chang, D.Y.; Jacoboski, J.A.; Fisher, L.A.; Beirne, P.J.

    1993-01-01

    The Estimating Services Department of the Fernald Environmental Restoration Management Corporation (FERMCO) is formalizing the process of life-cycle cost analysis (LCCA) for the Fernald Environmental Management Project (FEMP). The LCCA process is based on the concepts, principles, and guidelines described by applicable Department of Energy's (DOE) orders, pertinent published literature, and the National Bureau of Standards handbook 135. LCC analyses will be performed following a ten-step process on the FEMP at the earliest possible decision point to support the selection of the least-cost alternatives for achieving the FERMCO mission

  16. Fernald Environmental Management Project 1995 site environmental report

    International Nuclear Information System (INIS)

    1996-06-01

    The Fernald site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. This 1995 Site Environmental Report provides the general public as well as scientists and engineers with the results from the site's ongoing Environmental Monitoring Program. Also included in this report is information concerning the site's progress toward achieving full compliance with requirements set forth by DOE, US Environmental Protection Agency (USEPA), and Ohio EPA

  17. An aerial radiological survey of the Fernald Environmental Management Project and surrounding area, Fernald, Ohio

    International Nuclear Information System (INIS)

    Phoenix, K.A.

    1997-04-01

    An aerial radiological survey was conducted from May 17--22, 1994, over a 36 square mile (93 square kilometer) area centered on the Fernald Environmental Management Project located in Fernald, Ohio. The purpose of the survey was to detect anomalous gamma radiation in the environment surrounding the plant. The survey was conducted at a nominal altitude of 150 feet (46 meters) with a line spacing of 250 feet (76 meters). A contour map of the terrestrial gamma exposure rate extrapolated to 1 meter (3.3 feet) above ground was prepared and overlaid on an aerial photograph of the area. Analysis of the data for man made sources showed five sites within the boundaries of the Fernald Environmental Management Project having elevated readings. The exposure rates outside the plant boundary were typical of naturally occurring background radiation. Soil samples and pressurized ion chamber measurements were obtained at four locations within the survey boundaries to supplement the aerial data. It was concluded that although the radionuclides identified in the high-exposure-rate areas are naturally occurring, the levels encountered are greatly enhanced due to industrial activities at the plant

  18. Fernald Environmental Management Project 1995 site environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The Fernald site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. This 1995 Site Environmental Report provides the general public as well as scientists and engineers with the results from the site`s ongoing Environmental Monitoring Program. Also included in this report is information concerning the site`s progress toward achieving full compliance with requirements set forth by DOE, US Environmental Protection Agency (USEPA), and Ohio EPA.

  19. Celebrating success at Fernald

    International Nuclear Information System (INIS)

    Ofte, D.; Baublitz, J.E.; Chaney, K.; Hansen, R.

    1995-01-01

    Restoration of the Fernald Environmental Management Project is now moving from the environmental investigation stage to real, tangible remediation progress. Using a variety of programmatic innovations, DOE and FERMCO continue to strengthen an effective partnership that supports a mutually-developed mission of safe, least-cost, earliest final remediation of the Fernald Site while complying with all applicable DOE Orders, regulatory requirements and commitments and addressing the concerns of the many stakeholders who have an interest in how remediation at Fernald progresses. The progress that is occurring at Fernald is testimony to a productive DOE/FERMCO partnership that will continue to be an essential part of the difficult environmental restoration task at this site

  20. Ensuring comparability of data generated by multiple analytical laboratories for environmental decision making at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Sutton, C.; Campbell, B.A.; Danahy, R.J.; Dugan, T.A.; Tomlinson, F.K.

    1994-01-01

    The Fernald Environmental Management Project is a US Department of Energy (DOE)-owned facility located 17 miles northwest of Cincinnati, Ohio. From 1952 until 1989, the Fernald site provided high-purity uranium metal products to support US defense programs. In 1989 the mission of Fernald changed from one of uranium production to one of environmental restoration. At Fernald, multiple functional programs require analytical data. Inorganic and organic data for these programs are currently generated by seven laboratories, while radiochemical data are being obtained from six laboratories. Quality Assurance (QA) and Quality Control (QC) programs have been established to help ensure comparability of data generated by multiple laboratories at different times. The quality assurance program for organic and inorganic measurements specifies which analytical methodologies and sample preparation procedures are to be used based on analyte class, sample matrix, and data quality requirements. In contrast, performance specifications have been established for radiochemical analyses. A blind performance evaluation program for all laboratories, both on-site and subcontracted commercial laboratories, provides continuous feedback on data quality. The necessity for subcontractor laboratories to participate in the performance evaluation program is a contractual requirement. Similarly, subcontract laboratories are contractually required to generate data which meet radiochemical performance specifications. The Fernald on-site laboratory must also fulfill these requirements

  1. Status of decommissioning activities at the Fernald Environmental Management Project (FEMP) site

    International Nuclear Information System (INIS)

    1996-01-01

    The Fernald Environmental Management Project (FEMP) was formally closed and the mission of the facility was officially redirected toward environmental restoration in August 1991. Many of the production facilities and equipment still contained quantities of raw, intermediate, and finished production-related materials. The safe Shutdown program was initiated to remove and properly disposition all nuclear product and in process residue materials, supplies, chemicals, and associated process equipment that was abandoned in place when FEMP stopped production in 1989. As part of the remedial design of the interim remedial action, a schedule for building dismantlement was submitted in June 1995. A 31-year schedule was developed, based on anticipation of reduced funding levels. However, recent cleanup successes at Fernald led to DOE endorsement of greater funding for the final cleanup, accelerating the schedule for Operable Unit 3 dismantlement, reducing the schedule to ten years. Under the accelerated schedule, several plants will be dismantled, starting in 1996

  2. Radiological release criteria at the Fernald Environmental Management Project theory and practice

    International Nuclear Information System (INIS)

    Lehrter, R.W.

    1995-01-01

    As environmental restoration activities progress at the DOE's Fernald site, and across the country, large volumes of radioactive scrap metal (RSM) are being generated. Despite the existence of ''free-release'' guidelines from DOE. The strategy of onsite decontamination and release of RSM for unrestricted use has been generally overlooked in recent years. A pilot project was completed at Fernald in which 120 tons of RSM were decontaminated onsite and released for unrestricted use. This paper compares that strategy to more traditional DOE RSM management practices. Many options exist for managing RSM. DOE orders dictate that contractors demonstrate flexibility in utilizing a combination of techniques to optimize the benefits of waste management activates. The FERMCO Recycling Department led an effort to provide their customer with an economical alternative to the traditional approach of burying contaminated metal as LLW, based on established DOE free-release guidelines

  3. An assessment of baseline ecological risks at the Fernald Environmental Management Project, Fernald, Ohio

    International Nuclear Information System (INIS)

    Duke, C.S.; Meyers-Schone, L.; Glum, S.R.; Quaider, W.

    1991-01-01

    The Fernald Environmental Management Project (FEMP), formerly the Feed Materials Production Center (FMPC), is a Department of Energy (DOE) facility located near Cincinnati, Ohio, which produced pure uranium metals from the early 1950s until 1989. DOE is currently conducting a Remedial Investigation/Feasibility Study (RI/FS) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), in order to remediate environmental impacts at the site. DOE is also preparing an environmental impact statement under the National Environmental Policy Act (NEPA) to evaluate environmental impacts of proposed remedial actions. Both CERCLA and NEPA require evaluation of ecological risks of baseline conditions and proposed remedial actions. A preliminary assessment of ecological risks examined the potential effects of FEMP contaminants in one operable unit (OU) at the site, OU5, Environmental Media. Radionuclides of potential concern in OU5 soils include uranium, cesium, radium, strontium, technetium, and thorium. Chemicals detected in terrestrial organisms include aluminum, arsenic, barium, cadmium, lead, mercury, vanadium, and zinc, as well as radionuclides. Chemicals of potential concern in surface water include a variety of metals as well as uranium and technetium. Radionuclides in OU5 do not appear to pose a hazard to terrestrial organisms. Estimated radiation doses to aquatic organisms continually exposed to the maximum uranium concentrations observed in on-property drainages ranged from 40 to 4000 rad per year. However, off-property radionuclide concentrations are very low, and it is unlikely that organisms in streams adjacent to the FEMP are exposed to toxic levels. Maximum arsenic levels in vegetation collected from the FEMP are consistent with values reported in the literature to be toxic to certain plants. However, signs of stress have not been observed in vegetation on or adjacent to the FEMP

  4. Modeling subsurface contamination at Fernald

    International Nuclear Information System (INIS)

    Jones, B.W.; Flinn, J.C.; Ruwe, P.R.

    1994-01-01

    The Department of Energy's Fernald site is located about 20 miles northwest of Cincinnati. Fernald produced refined uranium metal products from ores between 1953 and 1989. The pure uranium was sent to other DOE sites in South Carolina, Tennessee, Colorado,and Washington in support of the nation's strategic defense programs. Over the years of large-scale uranium production, contamination of the site's soil and groundwater occurred.The contamination is of particular concern because the Fernald site is located over the Great Miami Aquifer, a designated sole-source drinking water aquifer. Contamination of the aquifer with uranium was found beneath the site, and migration of the contamination had occurred well beyond the site's southern boundary. As a result, Fernald was placed on the National Priorities (CERCLA/Superfund) List in 1989. Uranium production at the site ended in 1989,and Fernald's mission has been changed to one of environmental restoration. This paper presents information about computerized modeling of subsurface contamination used for the environmental restoration project at Fernald

  5. 1995 annual epidemiologic surveillance report for Fernald Environmental Management Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    The US Department of Energy's (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. During the past several years, a number of DOE sites have participated in the Epidemiologic Surveillance Program. This program monitors illnesses and health conditions that result in an absence of five or more consecutive workdays, occupational injuries and illnesses, and disabilities and deaths among current workers. This report provides a summary of epidemiologic surveillance data collected from the Fernald Environmental Management Project (FEMP) from January 1, 1995 through December 31, 1995. The data were collected by a coordinator at FEMP and submitted to the Epidemiologic Surveillance Data Center, located at Oak Ridge Institute for Science and Education, where quality control procedures and data analyses were carried out.

  6. 1995 annual epidemiologic surveillance report for Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    1995-01-01

    The US Department of Energy's (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. During the past several years, a number of DOE sites have participated in the Epidemiologic Surveillance Program. This program monitors illnesses and health conditions that result in an absence of five or more consecutive workdays, occupational injuries and illnesses, and disabilities and deaths among current workers. This report provides a summary of epidemiologic surveillance data collected from the Fernald Environmental Management Project (FEMP) from January 1, 1995 through December 31, 1995. The data were collected by a coordinator at FEMP and submitted to the Epidemiologic Surveillance Data Center, located at Oak Ridge Institute for Science and Education, where quality control procedures and data analyses were carried out

  7. Progress report on decommissioning activities at the Fernald Environmental Management Project (FEMP) site

    International Nuclear Information System (INIS)

    1998-01-01

    The Fernald Environmental Management Project (FEMP), is located about 18 miles northwest of Cincinnati, Ohio. Between 1953 and 1989, the facility, then called the Feed Material Production Center or FMPC, produced uranium metal products used in the eventual production of weapons grade material for use by other US Department of Energy (DOE) sites. In 1989, FMPC's production was suspended by the federal government in order to focus resources on environmental restoration versus defense production. In 1992, Fluor Daniel Fernald assumed responsibility for managing all cleanup activities at the FEMP under contract to the DOE. In 1990, as part of the remediation effort, the site was divided into five operable units based on physical proximity of contaminated areas, similar amounts of types of contamination, or the potential for a similar technology to be used in cleanup activities. This report continues the outline of the decontamination and decommissioning (D and D) activities at the FEMP site Operable Unit 3 (OU3) and provides an update on the status of the decommissioning activities. OU3, the Facilities Closure and Demolition Project, involves the remediation of more than 200 uranium processing facilities. The mission of the project is to remove nuclear materials stored in these buildings, then perform the clean out of the buildings and equipment, and decontaminate and dismantle the facilities

  8. Remediation activities at the Fernald Environmental Management Project (FEMP)

    International Nuclear Information System (INIS)

    Walsh, T.J.; Danner, R.

    1996-01-01

    The Fernald Environmental Management Project (FEMP) is a United States Department of Energy (DOE) facility located in southwestern Ohio. The facility began manufacturing uranium products in the early 1950's and continued processing uranium ore concentrates until 1989. The facility used a variety of chemical and metallurgical processes to produce uranium metals for use at other DOE sites across the country. Since the facility manufactured uranium metals for over thirty years, various amounts of radiological contamination exists at the site. Because of the chemical and metallurgical processes employed at the site, some hazardous wastes as defined by the Resource Conservation and Recovery Act (RCRA) were also generated at the site. In 1989. the FEMP was placed on the National Priorities List (NPL) requiring cleanup of the facility's radioactive and chemical contamination under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This paper discusses the proposed remediation activities at the five Operable Units (OUs) designated at the FEMP. In addition, the paper also examines the ongoing CERCLA response actions and RCRA closure activities at the facility

  9. Uranium contamination in the Great Miami Aquifer at the Fernald Environmental Management Project, Fernald, Ohio

    International Nuclear Information System (INIS)

    Sidle, W.C.

    1996-01-01

    Ground-water investigations at a former US Department of Energy nuclear weapons complex near Fernald, in southwestern Ohio, included the delineation of uranium contamination above the USEPA proposed drinking water standard of 20 microg/l. Contamination occurs in a buried valley and has migrated >1.5 km south-southeast of the facility boundary. Flooring of the plume(s) appears to be ≅ 32 m below the water table of the Great Miami Aquifer. U 6+ predominates in the modeled U-O 2 -CO 2 -H 2 O system and U retardation decreases at depth. U 234 /U 238 disequilibria analyses complement hydrogeologic studies which suggest that U leakage through the clayey till cap is less significant than the predominant transport pathway of infiltration via drainage channels incised into the aquifer

  10. DOE pursuing accelerated cleanup at Fernald

    International Nuclear Information System (INIS)

    Borgman, T.

    1996-01-01

    The timing is right, and officials at Fernald are ready to initiate final cleanup actions-at an accelerated pace. open-quotes We have a viable, aggressive plan in place that will reduce the risks associated with the site by accelerating the cleanup schedule, and save a lot of time and money in the process,close quotes said Don Ofte, president of the Fernald Environmental Restoration management Corporation (FERMCO). Ofte is referring to the accelerated cleanup plan that the U.S. Department of Energy has approved to complete the remediation of Fernald in approximately 10 years-instead of 25-30 years-at a cost savings to taxpayers of almost $3 billion. This article describes the scenario at Fernald and politically which has lead to this decision

  11. Environmental Restoration

    Energy Technology Data Exchange (ETDEWEB)

    Zeevaert, T.; Vanmarcke, H

    1998-07-01

    The objectives of SCK-CEN's programme on environmental restoration are (1) to optimize and validate models for the impact assessment from environmental, radioactive contaminations, including waste disposal or discharge; (2) to support the policy of national authorities for public health and radioactive waste management. Progress and achievements in 1997 are reported.

  12. The Fernald Envoy Program: How face-to-face public involvement is working

    Energy Technology Data Exchange (ETDEWEB)

    Hoopes, J. [Fernald Environmental Restoration Management Corp., Cincinnati, OH (United States). Fernald Environmental Management Project; Hundertmark, C.A. [Jacobs Engineering Group, Inc., Albuquerque, NM (United States); Jordan, J. [Univ. of Cincinnati, OH (United States). Center for Environmental Communication Studies

    1995-12-31

    In March 1994, the Fernald Environmental Management Project (FEMP), initiated the Fernald Envoy Program as a tool for strengthening public involvement in the restoration of the Fernald site, a former US Department of Energy uranium processing facility which ceased operation in 1989 and became an environmental restoration site. Based on the concept that opinion leaders play a key role in the flow of information, the Envoy Program was developed to link Fernald with opinion leaders in community groups. In February and March 1995, the University of Cincinnati Center for Environmental Communication Studies, under contract with the Fernald Environmental Restoration Management Corporation, conducted an evaluation to determine how the Envoy Program was functioning in relation to the original Envoy Plan. A quasi-experimental design was applied using telephone surveys of opinion leaders in groups with envoy representation and in groups without representation. Findings validated the effectiveness of the program and also identified areas for program improvement.

  13. The Fernald Envoy Program: How face-to-face public involvement is working

    International Nuclear Information System (INIS)

    Hoopes, J.; Jordan, J.

    1995-01-01

    In March 1994, the Fernald Environmental Management Project (FEMP), initiated the Fernald Envoy Program as a tool for strengthening public involvement in the restoration of the Fernald site, a former US Department of Energy uranium processing facility which ceased operation in 1989 and became an environmental restoration site. Based on the concept that opinion leaders play a key role in the flow of information, the Envoy Program was developed to link Fernald with opinion leaders in community groups. In February and March 1995, the University of Cincinnati Center for Environmental Communication Studies, under contract with the Fernald Environmental Restoration Management Corporation, conducted an evaluation to determine how the Envoy Program was functioning in relation to the original Envoy Plan. A quasi-experimental design was applied using telephone surveys of opinion leaders in groups with envoy representation and in groups without representation. Findings validated the effectiveness of the program and also identified areas for program improvement

  14. Technical approach to finalizing sensible soil cleanup levels at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Carr, D.; Hertel, B.; Jewett, M.; Janke, R.; Conner, B.

    1996-01-01

    The remedial strategy for addressing contaminated environmental media was recently finalized for the US Department of Energy's (DOE) Fernald Environmental Management Project (FEMP) following almost 10 years of detailed technical analysis. The FEMP represents one of the first major nuclear facilities to successfully complete the Remedial Investigation/Feasibility Study (RI/FS) phase of the environmental restoration process. A critical element of this success was the establishment of sensible cleanup levels for contaminated soil and groundwater both on and off the FEMP property. These cleanup levels were derived based upon a strict application of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) regulations and guidance, coupled with positive input from the regulatory agencies and the local community regarding projected future land uses for the site. The approach for establishing the cleanup levels was based upon a Feasibility Study (FS) strategy that examined a bounding range of viable future land uses for the site. Within each land use, the cost and technical implications of a range of health-protective cleanup levels for the environmental media were analyzed. Technical considerations in driving these cleanup levels included: direct exposure routes to viable human receptors; cross- media impacts to air, surface water, and groundwater; technical practicality of attaining the levels; volume of affected media; impact to sensitive environmental receptors or ecosystems; and cost. This paper will discuss the technical approach used to support the finalization of the cleanup levels for the site. The final cleanup levels provide the last remaining significant piece to the puzzle of establishing a final site-wide remedial strategy for the FEMP, and positions the facility for the expedient completion of site-wide remedial activities

  15. 2003 Fernald Environmental Management Project Annual Illness and Injury Surveillance Report, Revised September 2007

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, Office of Health, Safety and Security, Office of Illness and Injury Prevention Programs

    2007-10-04

    Annual Illness and Injury Surveillance Program report for 2003 for the Fernald Environmental Management Project. The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. The IISP monitors illnesses and health conditions that result in an absence of workdays, occupational injuries and illnesses, and disabilities and deaths among current workers.

  16. Technology development and applications at Fernald

    International Nuclear Information System (INIS)

    Pettit, P.J.; Skriba, M.C.; Warner, R.D.

    1995-01-01

    At the Fernald Environmental Management Project (FEMP) northwest of Cincinnati, Ohio, the U.S. Department of Energy and contractor Fernald Environmental Restoration Management Corporation (FERMCO) are aggressively pursuing both the development and the application of improved, innovative technology to the environmental restoration task. Application of emerging technologies is particularly challenging in a regulatory environment that places pressure on operational managers to develop and meet tight schedules. The regulatory and operational needs make close communication essential between technology developers and technology users (CERCLA/RCRA Unit managers). At Fernald this cooperation and communication has led, not only to the development and demonstration of new technologies with applications at other sites, but also to application of new technologies directly to the Fernald clean up. New technologies have been applied to improve environmental safety and health, improve the effectiveness of restoration efforts, and to cut restoration costs. The paper will describe successful efforts to develop and apply new technologies at the FEMP and will emphasize those technologies that have been applied and are planned for use in the clean up of this former uranium production facility

  17. Environment, safety and health progress assessment of the Fernald Environmental Management Project (FEMP)

    Energy Technology Data Exchange (ETDEWEB)

    1991-11-01

    This report documents the results of the Environment, Safety, and Health (ES&H) Progress Assessment of the Fernald Environmental Management Project (FEMP), Fernald, Ohio, conducted from October 15 through October 25, 1991. The Secretary of Energy directed that small, focused, ES&H Progress Assessments be performed as part of the continuing effort to institutionalize line management accountability and the self-assessment process in the areas of ES&H. The FEMP assessment is the pilot assessment for this new program. The objectives for the FEMP ES&H Progress Assessment were to assess: (1) how the FEMP has progressed since the 1989 Tiger Assessment; (2) how effectively the FEMP has corrected specific deficiencies and associated root causes identified by that team; and (3) whether the current organization, resources, and systems are sufficient to proactively manage ES&H issues.

  18. Environment, safety and health progress assessment of the Fernald Environmental Management Project (FEMP)

    International Nuclear Information System (INIS)

    1991-11-01

    This report documents the results of the Environment, Safety, and Health (ES ampersand H) Progress Assessment of the Fernald Environmental Management Project (FEMP), Fernald, Ohio, conducted from October 15 through October 25, 1991. The Secretary of Energy directed that small, focused, ES ampersand H Progress Assessments be performed as part of the continuing effort to institutionalize line management accountability and the self-assessment process in the areas of ES ampersand H. The FEMP assessment is the pilot assessment for this new program. The objectives for the FEMP ES ampersand H Progress Assessment were to assess: (1) how the FEMP has progressed since the 1989 Tiger Assessment; (2) how effectively the FEMP has corrected specific deficiencies and associated root causes identified by that team; and (3) whether the current organization, resources, and systems are sufficient to proactively manage ES ampersand H issues

  19. Use of the environmental resource management and analysis system at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Erjavec, J.L.

    1992-01-01

    In the past, hazardous waste site characterization and remediation using computer-based technologies has been a difficult and time-consuming process because of the need to analyze data using non-interfaced computer and software environments. The Environmental Resource Management and Analysis System (ERMA) was developed as an innovative approach to the management, analyses and depiction of data collected during a hazardous site remediation. A modular, multi-disciplined software package, ERMA integrates an environmental database management system with variety of Geographic Information System technologies. ERMA capabilities include spatial analysis, three-dimensional subsurface geologic interpretation and modeling, terrain modeling, and groundwater flow and contaminant transport modeling. ERMA's data management is provided through a set of user-modifiable, graphic interface tools that permit complex data queries, data modification and reporting. An ERMA prototype has been implemented at the Fernald Environmental Management Project (a Department of Energy cleanup site) using groundwater monitoring and elevation data collected over the last few years. ERMA has enabled the precision posting of data from the 853 groundwater monitoring wells at the site. Data from these wells have ben used to define the piezometric surface of the Great Miami Aquifer and correlate it with the uranium concentration contours of an identified groundwater plume. Using spatial query capabilities, radioactive sampling results from monitoring wells have been compared to contour maps defining the extent of the plume to determine the validity of those maps and the need for additional well locations

  20. Achieving closure at Fernald

    Energy Technology Data Exchange (ETDEWEB)

    Bradburne, John; Patton, Tisha C.

    2001-02-25

    When Fluor Fernald took over the management of the Fernald Environmental Management Project in 1992, the estimated closure date of the site was more than 25 years into the future. Fluor Fernald, in conjunction with DOE-Fernald, introduced the Accelerated Cleanup Plan, which was designed to substantially shorten that schedule and save taxpayers more than $3 billion. The management of Fluor Fernald believes there are three fundamental concerns that must be addressed by any contractor hoping to achieve closure of a site within the DOE complex. They are relationship management, resource management and contract management. Relationship management refers to the interaction between the site and local residents, regulators, union leadership, the workforce at large, the media, and any other interested stakeholder groups. Resource management is of course related to the effective administration of the site knowledge base and the skills of the workforce, the attraction and retention of qualified a nd competent technical personnel, and the best recognition and use of appropriate new technologies. Perhaps most importantly, resource management must also include a plan for survival in a flat-funding environment. Lastly, creative and disciplined contract management will be essential to effecting the closure of any DOE site. Fluor Fernald, together with DOE-Fernald, is breaking new ground in the closure arena, and ''business as usual'' has become a thing of the past. How Fluor Fernald has managed its work at the site over the last eight years, and how it will manage the new site closure contract in the future, will be an integral part of achieving successful closure at Fernald.

  1. Environmental Survey preliminary report, Feed Materials Production Center, Fernald, Ohio

    Energy Technology Data Exchange (ETDEWEB)

    1987-03-01

    This report presents the preliminary findings from the first phase of the environmental survey of the United States Department of Energy (DOE) Feed Materials Production Center (FMPC), conducted June 16 through 27, 1986. The survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the survey is to identify environmental problems and areas of environmental risk associated with the FMPC. The survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the survey involves the review of existing site environmental data, observations of the operations carried on at FMPC, and interviews with site personnel. The survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its onsite activities. The Sampling and Analysis Plan will be executed by a DOE national laboratory or a support contractor. When completed, the results will be incorporated into the FMPC Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the FMPC survey. 41 refs., 20 figs., 25 tabs.

  2. Pilot study risk assessment for selected problems at the Fernald Environmental Management Project (FEMP)

    Energy Technology Data Exchange (ETDEWEB)

    Hamilton, L.D.; Meinhold, A.F.; Baxter, S.L.; Holtzman, S.; Morris, S.C.; Pardi, R.; Rowe, M.D.; Sun, C. (Brookhaven National Lab., Upton, NY (United States)); Anspaugh, L.; Layton, D. (Lawrence Livermore National Lab., CA (United States))

    1993-03-01

    Two important environmental problems at the USDOE Fernald Environmental Management Project (FEMP) facility in Fernald, Ohio were studied in this human health risk assessment. The problems studied were radon emissions from the K-65 waste silos, and offsite contamination of ground water with uranium. Waste from the processing of pitchblende ore is stored in the K-65 silos at the FEMP. Radium-226 in the waste decays to radon gas which escapes to the outside atmosphere. The concern is for an increase in lung cancer risk for nearby residents associated with radon exposure. Monitoring data and a gaussian plume transport model were used to develop a source term and predict exposure and risk to fenceline residents, residents within 1 and 5 miles of the silos, and residents of Hamilton and Cincinnati, Ohio. Two release scenarios were studied: the routine release of radon from the silos and an accidental loss of one silo dome integrity. Exposure parameters and risk factors were described as distributions. Risks associated with natural background radon concentrations were also estimated.

  3. Pilot study risk assessment for selected problems at the Fernald Environmental Management Project (FEMP)

    International Nuclear Information System (INIS)

    Hamilton, L.D.; Meinhold, A.F.; Baxter, S.L.; Holtzman, S.; Morris, S.C.; Pardi, R.; Rowe, M.D.; Sun, C.; Anspaugh, L.; Layton, D.

    1993-03-01

    Two important environmental problems at the USDOE Fernald Environmental Management Project (FEMP) facility in Fernald, Ohio were studied in this human health risk assessment. The problems studied were radon emissions from the K-65 waste silos, and offsite contamination of ground water with uranium. Waste from the processing of pitchblende ore is stored in the K-65 silos at the FEMP. Radium-226 in the waste decays to radon gas which escapes to the outside atmosphere. The concern is for an increase in lung cancer risk for nearby residents associated with radon exposure. Monitoring data and a gaussian plume transport model were used to develop a source term and predict exposure and risk to fenceline residents, residents within 1 and 5 miles of the silos, and residents of Hamilton and Cincinnati, Ohio. Two release scenarios were studied: the routine release of radon from the silos and an accidental loss of one silo dome integrity. Exposure parameters and risk factors were described as distributions. Risks associated with natural background radon concentrations were also estimated

  4. Integrating removal actions and remedial actions: Soil and debris management at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Goidell, L.C.; Hagen, T.D.; Strimbu, M.J.; Dupuis-Nouille, E.M.; Taylor, A.C.; Weese, T.E.; Yerace, P.J.

    1996-01-01

    Since 1991, excess soil and debris generated at the Fernald Environmental management Project (FEMP) have been managed in accordance with the principles contained in a programmatic Removal Action (RvA) Work Plan (WP). This plan provides a sitewide management concept and implementation strategy for improved storage and management of excess soil and debris over the period required to design and construct improved storage facilities. These management principles, however, are no longer consistent with the directions in approved and draft Records of Decision (RODs) and anticipated in draft RODs other decision documents. A new approach has been taken to foster improved management techniques for soil and debris that can be readily incorporated into remedial design/remedial action plans. Response, Compensation and Liability Act (CERCLA) process. This paper describes the methods that were applied to address the issues associated with keeping the components of the new work plan field implementable and flexible; this is especially important as remedial design is either in its initial stages or has not been started and final remediation options could not be precluded

  5. Draft final feasibility study report and proposed plan for Operable Unit 4, response to comments: Fernald Environmental Management Project, Fernald, Ohio

    International Nuclear Information System (INIS)

    1994-02-01

    This report contains questions and comments regarding a risk evaluation and possible remedial action of Operable Unit 4 at the Feed Materials Production Center at Fernald, Ohio. Attention is focused on the US EPA Region V feasibility study and on the CRARE. The CRARE is a post-remediation time frame document

  6. Draft final feasibility study report and proposed plan for Operable Unit 4, response to comments: Fernald Environmental Management Project, Fernald, Ohio

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    This report contains questions and comments regarding a risk evaluation and possible remedial action of Operable Unit 4 at the Feed Materials Production Center at Fernald, Ohio. Attention is focused on the US EPA Region V feasibility study and on the CRARE. The CRARE is a post-remediation time frame document.

  7. Surface and subsurface characterization of uranium contamination at the Fernald environmental management site

    International Nuclear Information System (INIS)

    Schilk, A.J.; Perkins, R.W.; Abel, K.H.; Brodzinski, R.L.

    1993-04-01

    The past operations of uranium production and support facilities at several Department of Energy (DOE) sites have occasionally resulted in the local contamination of some surface and subsurface soils, and the three-dimensional distribution of the uranium at these sites must be thoroughly characterized before any effective remedial protocols can be established. To this end, Pacific Northwest Laboratory (PNL) has been tasked by the DOE's Office of Technology Development with adapting, developing, and demonstrating technologies for the measurement of uranium in surface and subsurface soils at the Fernald Uranium in Soils Integrated Demonstration site. These studies are detailed in this report

  8. In situ construction of horizontal soil containment barrier at Fernald

    International Nuclear Information System (INIS)

    Ridenour, D.; Pettit, P.J.; Walker, J.

    1995-01-01

    An innovative method of placing soil barriers to contain vertical flow is being prepared for demonstration by the Fernald Environmental Restoration Management Corporation (FERMCO), working in conjunction with the Department of Energy Office of Technology Development (DOE/OTD) and two principle subcontractors. The method employs proven directional drilling techniques, jet grouting technology and unique placement tooling to form horizontal soil barriers in situ. This is done without disturbance to existing land disposed wastes. This paper is a summary report on the current state of that demonstration, including: a discussion of the construction methods, the results of the initial tool tests, an overview of the Fernald site conditions and, the resulting path of tooling development for the second phase of tool testing

  9. Ecological risks of DOE`s programmatic environmental restoration alternatives

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This report assesses the ecological risks of the Department of Energy`s (DOE) Environmental Restoration Program. The assessment is programmatic in that it is directed at evaluation of the broad programmatic alternatives outlined in the DOE Implementation Plan. It attempts to (1) characterize the ecological resources present on DOE facilities, (2) describe the occurrence and importance of ecologically significant contamination at major DOE facilities, (3) evaluate the adverse ecological impacts of habitat disturbance caused by remedial activities, and (4) determine whether one or another of the programmatic alternatives is clearly ecologically superior to the others. The assessment focuses on six representative facilities: the Idaho National Engineering Laboratory (INEL); the Fernald Environmental Management Project (FEMP); the Oak Ridge Reservation (ORR), including the Oak Ridge National Laboratory (ORNL), Y-12 plant, and K-25 plant; the Rocky Flats Plant; the Hanford Reservation; and the Portsmouth Gaseous Diffusion Plant.

  10. Ecological risks of DOE's programmatic environmental restoration alternatives

    International Nuclear Information System (INIS)

    1994-06-01

    This report assesses the ecological risks of the Department of Energy's (DOE) Environmental Restoration Program. The assessment is programmatic in that it is directed at evaluation of the broad programmatic alternatives outlined in the DOE Implementation Plan. It attempts to (1) characterize the ecological resources present on DOE facilities, (2) describe the occurrence and importance of ecologically significant contamination at major DOE facilities, (3) evaluate the adverse ecological impacts of habitat disturbance caused by remedial activities, and (4) determine whether one or another of the programmatic alternatives is clearly ecologically superior to the others. The assessment focuses on six representative facilities: the Idaho National Engineering Laboratory (INEL); the Fernald Environmental Management Project (FEMP); the Oak Ridge Reservation (ORR), including the Oak Ridge National Laboratory (ORNL), Y-12 plant, and K-25 plant; the Rocky Flats Plant; the Hanford Reservation; and the Portsmouth Gaseous Diffusion Plant

  11. Determination of total and isotopic uranium by inductively coupled plasma-mass spectrometry at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Miller, F.L.; Bolin, R.N.; Feller, M.T.; Danahy, R.J.

    1995-01-01

    At the Fernald Environmental Management Project (FEMP) in southwestern Ohio, ICP-mass spectrometry (ICP-MS), with sample introduction by peristaltic pumping, is used to determine total and isotopic uranium (U-234, U-235, U-236 and U-238) in soil samples. These analyses are conducted in support of the environmental cleanup of the FEMP site. Various aspects of the sample preparation and instrumental analysis will be discussed. Initial sample preparation consists of oven drying to determine moisture content, and grinding and rolling to homogenize the sample. This is followed by a nitric/hydrofluoric acid digestion to bring the uranium in the sample into solution. Bismuth is added to the sample prior to digestion to monitor for losses. The total uranium (U-238) content of this solution and the U 235 /U 238 ratio are measured on the first pass through the ICP-MS. To determine the concentration of the less abundant U 234 and U 236 isotopes, the digestate is further concentrated by using Eichrom TRU-Spec extraction columns before the second pass through the ICP-MS. Quality controls for both the sample preparation and instrumental protocols will also be discussed. Finally, an explanation of the calculations used to report the data in either weight percent or activity units will be given

  12. Integration of health physics, safety and operational processes for management and disposition of recycled uranium wastes at the Fernald Environmental Management Project (FEMP)

    International Nuclear Information System (INIS)

    Barber, James; Buckley, James

    2003-01-01

    Fluor Fernald, Inc. (Fluor Fernald), the contractor for the U. S. Department of Energy (DOE) Fernald Environmental Management Project (FEMP), recently submitted a new baseline plan for achieving site closure by the end of calendar year 2006. This plan was submitted at DOE's request, as the FEMP was selected as one of the sites for their accelerated closure initiative. In accordance with the accelerated baseline, the FEMP Waste Management Project (WMP) is actively evaluating innovative processes for the management and disposition of low-level uranium, fissile material, and thorium, all of which have been classified as waste. These activities are being conducted by the Low Level Waste (LLW) and Uranium Waste Disposition (UWD) projects. Alternatives associated with operational processing of individual waste streams, each of which poses potentially unique health physics, industrial hygiene and industrial hazards, are being evaluated for determination of the most cost effective and safe met hod for handling and disposition. Low-level Mixed Waste (LLMW) projects are not addressed in this paper. This paper summarizes historical uranium recycling programs and resultant trace quantity contamination of uranium waste streams with radionuclides, other than uranium. The presentation then describes how waste characterization data is reviewed for radiological and/or chemical hazards and exposure mitigation techniques, in conjunction with proposed operations for handling and disposition. The final part of the presentation consists of an overview of recent operations within LLW and UWD project dispositions, which have been safely completed, and a description of several current operations

  13. Integration of health physics, safety and operational processes for management and disposition of recycled uranium wastes at the Fernald Environmental Management Project (FEMP)

    Energy Technology Data Exchange (ETDEWEB)

    Barber, James; Buckley, James

    2003-02-23

    Fluor Fernald, Inc. (Fluor Fernald), the contractor for the U. S. Department of Energy (DOE) Fernald Environmental Management Project (FEMP), recently submitted a new baseline plan for achieving site closure by the end of calendar year 2006. This plan was submitted at DOE's request, as the FEMP was selected as one of the sites for their accelerated closure initiative. In accordance with the accelerated baseline, the FEMP Waste Management Project (WMP) is actively evaluating innovative processes for the management and disposition of low-level uranium, fissile material, and thorium, all of which have been classified as waste. These activities are being conducted by the Low Level Waste (LLW) and Uranium Waste Disposition (UWD) projects. Alternatives associated with operational processing of individual waste streams, each of which poses potentially unique health physics, industrial hygiene and industrial hazards, are being evaluated for determination of the most cost effective and safe met hod for handling and disposition. Low-level Mixed Waste (LLMW) projects are not addressed in this paper. This paper summarizes historical uranium recycling programs and resultant trace quantity contamination of uranium waste streams with radionuclides, other than uranium. The presentation then describes how waste characterization data is reviewed for radiological and/or chemical hazards and exposure mitigation techniques, in conjunction with proposed operations for handling and disposition. The final part of the presentation consists of an overview of recent operations within LLW and UWD project dispositions, which have been safely completed, and a description of several current operations.

  14. 1994 Fernald field characterization demonstration program data report

    Energy Technology Data Exchange (ETDEWEB)

    Rautman, C.A. [Sandia National Labs., Albuquerque, NM (United States); Cromer, M.V. [Spectra Research Inst., Albuquerque, NM (United States); Newman, G.C. [GRAM, Inc., Albuquerque, NM (United States); Beiso, D.A. [Los Alamos Technical Associates, Inc., NM (United States)

    1995-12-01

    The 1994 Fernald field characterization demonstration program, hosted by Fernald Environmental Management Project, was established to investigate technologies that are applicable to the characterization and remediation of soils contaminated with uranium. An important part of this effort was evaluating field-screening tools potentially capable of acquiring high-resolution information on uranium contamination distribution in surface soils. Further-more, the information needed to be obtained in a cost- and time-efficient manner. Seven advanced field-screening technologies were demonstrated at a uranium-contaminated site at Fernald, located 29 kilometers northwest of Cincinnati, Ohio. The seven technologies tested were: (1) alpha-track detectors, (2) a high-energy beta scintillometer, (3) electret ionization chambers, (4) and (5) two variants of gamma-ray spectrometry, (6) laser ablation-inductively coupled plasma-atomic emission spectroscopy, and (7) long-range alpha detection. The goals of this field demonstration were to evaluate the capabilities of the detectors and to demonstrate their utility within the US Department of Energy`s Environmental Restoration Program. Identical field studies were conducted using four industry-standard characterization tools: (1) a sodium-iodide scintillometer, (2) a low-energy FIDLER scintillometer, (3) a field-portable x-ray fluorescence detector, and (4) standard soil sampling coupled with laboratory analysis. Another important aspect of this program was the application of a cost/risk decision model to guide characterization of the site. This document is a compilation of raw data submitted by the technologies and converted total uranium data from the 1994 Fernald field characterization demonstration.

  15. 1994 Fernald field characterization demonstration program data report

    International Nuclear Information System (INIS)

    Rautman, C.A.; Cromer, M.V.; Newman, G.C.; Beiso, D.A.

    1995-12-01

    The 1994 Fernald field characterization demonstration program, hosted by Fernald Environmental Management Project, was established to investigate technologies that are applicable to the characterization and remediation of soils contaminated with uranium. An important part of this effort was evaluating field-screening tools potentially capable of acquiring high-resolution information on uranium contamination distribution in surface soils. Further-more, the information needed to be obtained in a cost- and time-efficient manner. Seven advanced field-screening technologies were demonstrated at a uranium-contaminated site at Fernald, located 29 kilometers northwest of Cincinnati, Ohio. The seven technologies tested were: (1) alpha-track detectors, (2) a high-energy beta scintillometer, (3) electret ionization chambers, (4) and (5) two variants of gamma-ray spectrometry, (6) laser ablation-inductively coupled plasma-atomic emission spectroscopy, and (7) long-range alpha detection. The goals of this field demonstration were to evaluate the capabilities of the detectors and to demonstrate their utility within the US Department of Energy's Environmental Restoration Program. Identical field studies were conducted using four industry-standard characterization tools: (1) a sodium-iodide scintillometer, (2) a low-energy FIDLER scintillometer, (3) a field-portable x-ray fluorescence detector, and (4) standard soil sampling coupled with laboratory analysis. Another important aspect of this program was the application of a cost/risk decision model to guide characterization of the site. This document is a compilation of raw data submitted by the technologies and converted total uranium data from the 1994 Fernald field characterization demonstration

  16. THE ROLE OF LAND USE IN ENVIRONMENTAL DECISION MAKING AT THREE DOE MEGA-CLEANUP SITES FERNALD & ROCKY FLATS & MOUND

    Energy Technology Data Exchange (ETDEWEB)

    JEWETT MA

    2011-01-14

    This paper explores the role that future land use decisions have played in the establishment of cost-effective cleanup objectives and the setting of environmental media cleanup levels for the three major U.S. Department of Energy (DOE) sites for which cleanup has now been successfully completed: the Rocky Flats, Mound, and Fernald Closure Sites. At each site, there are distinct consensus-building histories throughout the following four phases: (1) the facility shut-down and site investigation phase, which took place at the completion of their Cold War nuclear-material production missions; (2) the decision-making phase, whereby stakeholder and regulatory-agency consensus was achieved for the future land-use-based environmental decisions confronting the sites; (3) the remedy selection phase, whereby appropriate remedial actions were identified to achieve the future land-use-based decisions; and (4) the implementation phase, whereby the selected remedial actions for these high-profile sites were implemented and successfully closed out. At each of the three projects, there were strained relationships and distrust between the local community and the DOE as a result of site contamination and potential health effects to the workers and local residents. To engage citizens and interested stakeholder groups - particularly in the role of final land use in the decision-making process, the site management teams at each respective site developed new public-participation strategies to open stakeholder communication channels with site leadership, technical staff, and the regulatory agencies. This action proved invaluable to the success of the projects and reaching consensus on appropriate levels of cleanup. With the implementation of the cleanup remedies now complete, each of the three DOE sites have become models for future environmental-remediation projects and associated decision making.

  17. The CAMU Rule: A tool for implementing a protective, cost-effective remedy at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Dupuis-Nouille, E.M.; Goidell, L.C.; Strimbu, M.J.

    1995-01-01

    The Fernald Environmental Management Project (FEMP) is a former uranium processing facility currently under remediation pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act as amended (CERCLA). Contamination at the FEMP consists of low-level radioactivity, hazardous substances, hazardous wastes and/or mixed wastes. Regulations promulgated under the Resource Conservation and Recovery Act as amended (RCRA) are evaluated as applicable or relevant and appropriate requirements (ARARs) for remediation of the FEMP. Historically, joint CERCLA-RCRA guidance dictated that hazardous waste could not be treated, or moved out of the designated area of contiguous contamination (AOC), without triggering land disposal restrictions (LDRs) or minimum technology requirements (MTRs). To avoid invoking these stringent requirements, in situ capping was chosen as the lower cost remedy at many sites, although on-site disposal and/or treatment of hazardous wastes would have been more protective. The Corrective Action Management Units (CAMUs) and Temporary Units (TUs) Final Rule [58 FR 8658, Vol. 58, No. 29, hereinafter the open-quotes CAMU Ruleclose quotes], promulgated on February 16, 1993, provides facilities regulated under RCRA corrective action authority with greater flexibility to move, treat, and dispose of wastes on site without triggering LDRs or MTRs, thereby encouraging application of innovative technologies and more protective remedies. The waste acceptance criteria for the on-site disposal facility is based on site-specific considerations including the mobility of the contaminants through the underlying site geology and the protectiveness of the engineered liners. Application of the open-quotes CAMU Ruleclose quotes allows for disposition in the on-site facility based on these technical considerations rather than on regulatory classifications

  18. Basic research for environmental restoration

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-01

    The Department of Energy (DOE) is in the midst of a major environmental restoration effort to reduce the health and environmental risks resulting from past waste management and disposal practices at DOE sites. This report describes research needs in environmental restoration and complements a previously published document, DOE/ER-0419, Evaluation of Mid-to-Long Term Basic Research for Environmental Restoration. Basic research needs have been grouped into five major categories patterned after those identified in DOE/ER-0419: (1) environmental transport and transformations; (2) advanced sampling, characterization, and monitoring methods; (3) new remediation technologies; (4) performance assessment; and (5) health and environmental effects. In addition to basic research, this document deals with education and training needs for environmental restoration. 2 figs., 6 tabs.

  19. Basic research for environmental restoration

    International Nuclear Information System (INIS)

    1990-12-01

    The Department of Energy (DOE) is in the midst of a major environmental restoration effort to reduce the health and environmental risks resulting from past waste management and disposal practices at DOE sites. This report describes research needs in environmental restoration and complements a previously published document, DOE/ER-0419, Evaluation of Mid-to-Long Term Basic Research for Environmental Restoration. Basic research needs have been grouped into five major categories patterned after those identified in DOE/ER-0419: (1) environmental transport and transformations; (2) advanced sampling, characterization, and monitoring methods; (3) new remediation technologies; (4) performance assessment; and (5) health and environmental effects. In addition to basic research, this document deals with education and training needs for environmental restoration. 2 figs., 6 tabs

  20. Final environmental assessment for the U.S. Department of Energy, Oak Ridge Operations receipt and storage of uranium materials from the Fernald Environmental Management Project site

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    Through a series of material transfers and sales agreements over the past 6 to 8 years, the Fernald Environmental Management Project (FEMP) has reduced its nuclear material inventory from 14,500 to approximately 6,800 metric tons of uranium (MTU). This effort is part of the US Department of energy`s (DOE`s) decision to change the mission of the FEMP site; it is currently shut down and the site is being remediated. This EA focuses on the receipt and storage of uranium materials at various DOE-ORO sites. The packaging and transportation of FEMP uranium material has been evaluated in previous NEPA and other environmental evaluations. A summary of these evaluation efforts is included as Appendix A. The material would be packaged in US Department of Transportation-approved shipping containers and removed from the FEMP site and transported to another site for storage. The Ohio Field Office will assume responsibility for environmental analyses and documentation for packaging and transport of the material as part of the remediation of the site, and ORO is preparing this EA for receipt and storage at one or more sites.

  1. Final environmental assessment for the U.S. Department of Energy, Oak Ridge Operations receipt and storage of uranium materials from the Fernald Environmental Management Project site

    International Nuclear Information System (INIS)

    1999-01-01

    Through a series of material transfers and sales agreements over the past 6 to 8 years, the Fernald Environmental Management Project (FEMP) has reduced its nuclear material inventory from 14,500 to approximately 6,800 metric tons of uranium (MTU). This effort is part of the US Department of energy's (DOE's) decision to change the mission of the FEMP site; it is currently shut down and the site is being remediated. This EA focuses on the receipt and storage of uranium materials at various DOE-ORO sites. The packaging and transportation of FEMP uranium material has been evaluated in previous NEPA and other environmental evaluations. A summary of these evaluation efforts is included as Appendix A. The material would be packaged in US Department of Transportation-approved shipping containers and removed from the FEMP site and transported to another site for storage. The Ohio Field Office will assume responsibility for environmental analyses and documentation for packaging and transport of the material as part of the remediation of the site, and ORO is preparing this EA for receipt and storage at one or more sites

  2. Environmental Restoration Quality Program Plan. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Colley, J.S.

    1992-08-01

    The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a ``entral Environmental Restoration Division`` to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization`s objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

  3. Characterization of Fernald Silo 3 Waste

    Energy Technology Data Exchange (ETDEWEB)

    Langton, C.A.

    2001-04-04

    This report summarizes characterization results for uranium residues from the Fernald Environmental Management Project (FEMP) Operable Unit (OU-4). These residues are currently stored in a one-million-gallon concrete silo, Silo 3, at the DOE Fernald Site, Ohio. Characterization of the Silo 3 waste is the first part of a three part study requested by Rocky Mountain Remedial Services (RMRS) through a Work for others Agreement, WFO-00-007, between the Westinghouse Savannah River Company (WSRC) and RMRS. Parts 2 and 3 of this effort include bench- and pilot-scale testing.

  4. Environmental Restoration Quality Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Colley, J.S.

    1992-08-01

    The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a entral Environmental Restoration Division'' to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization's objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

  5. Progressively safer, cheaper demolition of Fernald

    International Nuclear Information System (INIS)

    Nichols, Robert; Pennington, Norman

    2000-01-01

    Fluor Fernald, Inc. has been progressively improving Decontamination and Dismantlement (D and D) at the Department of Energy's Fernald Environmental Management Project by applying new technologies and better methodologies to the work. Demolition issues existed in the past that necessitated new or improved solutions to maintain worker safety, protect the environment and accomplish the work in a cost effective manner. Lessons learned from D and D of 80 structures has led to a systematic approach, which can be implemented in various D and D arenas. When facility production was halted, hold-up material and process residues remained in the process piping and components. Over 500,000 pounds of material was removed by workers who completed the tasks two years ahead of schedule, $7 million under budget and with an excellent safety record. This success was the result of detailed planning and irdision of lessons learned as work progressed from facility to facility. Work sequences were developed that reduced airborne contamination. Demolition of structures has been performed at Fernald by carefully selected and qualified subcontractors. Asbestos and lead abatement, equipment, piping and conduit removal, and structural demolition have been completed to progressively higher performance specifications developed by Fluor Fernald based on lessons learned during execution. Safety continues to be the primary consideration in performing potentially hazardous work. Technologies such as hydraulic shears have been developed and used to keep workers away from danger. A new technology, ''Cool Suits,'' has been demonstrated to help prevent heat stress when anti-contamination clothing is required in elevated temperature working conditions. For tall structures, implosion technologies have been employed with progressively improved results, Several other new technologies have been evaluated by Fluor Fernald and applied by subcontractors. The improved technologies included the oxy-gas torch

  6. Evolution of Safety Basis Documentation for the Fernald Site

    International Nuclear Information System (INIS)

    Brown, T.; Kohler, S.; Fisk, P.; Krach, F.; Klein, B.

    2004-01-01

    The objective of the Department of Energy's (DOE) Fernald Closure Project (FCP), in suburban Cincinnati, Ohio, is to safely complete the environmental restoration of the Fernald site by 2006. Over 200 out of 220 total structures, at this DOE plant site which processed uranium ore concentrates into high-purity uranium metal products, have been safely demolished, including eight of the nine major production plants. Documented Safety Analyses (DSAs) for these facilities have gone through a process of simplification, from individual operating Safety Analysis Reports (SARs) to a single site-wide Authorization Basis containing nuclear facility Bases for Interim Operations (BIOs) to individual project Auditable Safety Records (ASRs). The final stage in DSA simplification consists of project-specific Integrated Health and Safety Plans (I-HASPs) and Nuclear Health and Safety Plans (N-HASPs) that address all aspects of safety, from the worker in the field to the safety basis requirements preserving the facility/activity hazard categorization. This paper addresses the evolution of Safety Basis Documentation (SBD), as DSAs, from production through site closure

  7. The Fernald wet records recovery project: A case history

    Energy Technology Data Exchange (ETDEWEB)

    Sterling, H.J.; Devir, B.R.; Hawley, R.A. [Fernald Environmental Restoration Management Corp., Cincinnati, OH (United States); Freesmeyer, M.T. [USDOE Ohio Field Office (United States)

    1995-06-22

    This paper discusses a project performed to recover wet records discovered in January 1995 at the Fernald Environmental Management Project (FEMP). This paper discusses the emergency and record recovery phases of the project, the technical options considered for records recovery, and special measures which were required due to radiological contamination of the records. Also, the root causes and lessons learned from the incident, and path forward for future records management operations at Fernald, are discussed.

  8. Environmental Restoration 1997 annual report

    International Nuclear Information System (INIS)

    Cosper, M.B.

    1997-01-01

    During 1997, the Environmental Restoration Program at the Savannah River Site achieved all of the ''Breakthrough Goals'' that were established with the regulatory agencies in 1995 to advance their cleanup efforts. Effective focus on field remediation was demonstrated by the allocation of 75% of program funding to remediation activities. The Remediation Phase is complete or has begun on sixty-nine waste sites that represent approximately 80% of the known environmental and health risk. The average time required for the assessment phase of active projects was reduced by 50%, from 49 to less than 24 months, which allows cleanup actions to start twice as fast as before. Breakthrough performance has tangible results. During 1997, all of the funding allocation was used effectively to accomplish environmental restoration scope worth over $123 million. That represents a validated cost efficiency of over 20% for the third straight year. Over half of the 500 contaminated acres at SRS have been cleaned up or are currently in the remediation phase. Almost 3 billion gallons of groundwater have been restored by removing over half a million pounds of organic solvents

  9. Environmental restoration project configuration control

    International Nuclear Information System (INIS)

    Hutterman, L.L.

    1991-01-01

    This paper provides an overview of the approach that Westinghouse Idaho Nuclear Company, Inc. (WINCO) is using for the implementation of the configuration control requirements for a major system acquisition under the guidance of US Department of Energy (DOE) Order 4700.1, open-quotes Project Management System,close quotes for environmental restoration. The two major features of the WINCO environmental restoration approach relate to (1) the product and (2) the maintenance of the baseline for many sites in different phases at the same time. Historically, a project has typically produced a product. Environmental restoration in some ways produces no typical project product. Essentially, what is produced and what configuration control management is exercised on is one of the following: (1) the development of clean dirt, (2) the documentation to support clean dirt, or (3) the track record of each of the sites. It is the latter approach that this paper deals with. This approach is unique in that there are four baselines [cost, schedule, scope, and technical (the track record product)] rather than the typical three. This is essential in configuration management due to the lack of a uniquely identifiable product for each site. Essentially, the philosophy behind the four-part configuration controls allows the technical baseline to fulfill the function typically met by the identifiable product

  10. Technology needs for environmental restoration remedial action. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Watson, J.S.

    1992-11-01

    This report summarizes the current view of the most important technology needs for the US Department of Energy (DOE) facilities operated by Martin Marietta Energy Systems, Inc. These facilities are the Oak Ridge National Laboratory, the Oak Ridge K-25 Site, the Oak Ridge Y-12 Plant, the Paducah Gaseous Diffusion Plant, and the Portsmouth Gaseous Diffusion Plant. The sources of information used in this assessment were a survey of selected representatives of the Environmental Restoration (ER) programs at each facility, results from a questionnaire distributed by Geotech CWM, Inc., for DOE, and associated discussions with individuals from each facility. This is not a final assessment, but a brief look at an ongoing assessment; the needs will change as the plans for restoration change and, it is hoped, as some technical problems are solved through successful development programs.

  11. The Fernald Waste Recycling Program

    International Nuclear Information System (INIS)

    Motl, G.P.

    1993-01-01

    Recycling is considered a critical component of the waste disposition strategy at the Fernald Plant. It is estimated that 33 million cubic feet of waste will be generated during the Fernald cleanup. Recycling some portion of this waste will not only conserve natural resources and disposal volume but will, even more significantly, support the preservation of existing disposition options such as off-site disposal or on-site storage. Recognizing the strategic implications of recycling, this paper outlines the criteria used at Fernald to make recycle decisions and highlights several of Fernald's current recycling initiatives

  12. Automated container transportation using self-guided vehicles: Fernald site requirements

    International Nuclear Information System (INIS)

    Hazen, F.B.

    1993-09-01

    A new opportunity to improve the safety and efficiency of environmental restoration operations, using robotics has emerged from advances in industry, academia, and government labs. Self-Guided Vehicles (SGV's) have recently been developed in industry and early systems have already demonstrated much, though not all, of the functionality necessary to support driverless transportation of waste within and between processing facilities. Improved materials databases are being developed by at least two DOE remediation sites, the Fernald Environmental Management Project (FEME) in the State of Ohio and the Hanford Complex in the State of Washington. SGV's can be developed that take advantage of the information in these databases and yield improved dispatch, waste tracking, report and shipment documentation. In addition, they will reduce the radiation hazard to workers and the risk of damaging containers through accidental collision. In this document, features of remediation sites that dictate the design of both the individual SGV's and the collective system of SGV's are presented, through the example of the site requirements at Fernald. Some concepts borrowed from the world of manufacturing are explained and then used to develop an integrated, holistic view of the remediation site as a pseudo-factory. Transportation methods at Fernald and anticipated growth in transport demand are analyzed. The new site-wide database under development at Fernald is presented so that advantageous and synergistic links between SGV's and information systems can be analyzed. Details of the SGV development proposed are submitted, and some results of a recently completed state of the art survey for SGV use in this application are also presented

  13. Measurement of Radon, Thoron, Isotopic Uranium and Thorium to Determine Occupational and Environmental Exposure and Risk at Fernald Feed Material Production Center

    International Nuclear Information System (INIS)

    Harley, Naomi H.

    2004-01-01

    To develop a new and novel area and personal radon/thoron detector for both radon isotopes to better measure the exposure to low airborne concentrations of these gases at Fernald. These measurements are to be used to determine atmospheric dispersion and exposure to radon and thoron prior to and during retrieval and removal of the 4000 Ci of radium in the two silos at Fernald

  14. Environmental restoration project configuration control

    International Nuclear Information System (INIS)

    Hutterman, L.L.

    1991-01-01

    Projecting budget requirements for performing environmental restoration activities in a manner consistent with the regulatory agencies requires long-term planning, scheduling, and budget forecasting. The Westinghouse Idaho Nuclear Company, Inc. (WINCO) Environmental Restoration Program is responsible for 14 operable units at the Idaho Chemical Processing Plant (ICPP) at the Idaho National Engineering Laboratory (INEL). To facilitate response to US Department of Energy (DOE) requirements, a baseline document has been established, and activities for each of the environmental release sites have been developed. The baseline document is based primarily on the activities identified in the Interagency Agreement (IAG) for operable unit scoping and investigation. In addition, the schedule for some sites reflects fiscal year 1991 Consent Order Compliance Agreement requirements. Planning has been conducted through completion of the Record of Decision. The baseline document provides management with a defensible basis to project and control costs. Work that requires modification in scope, changes to applicable DOE or regulatory orders/guidance, or identification of additional release sites will normally impact costs and schedule. The impact of these changes will be evaluated and the baseline revised to reflect the changes. Management can use the baseline to evaluate potential cost impacts and assist with decision making when resources are limited to select the optimal technical strategy and minimize the impact to cost and schedule for other projects

  15. Poplar Island Environmental Restoration Project Nekton Data

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Poplar Island Environmental Restoration Project (PIERP) is a large scale 1,800 acres restoration project located in mid Chesapeake Bay. Fishery collections are...

  16. Development of subcontractor indirect cost and other direct cost at the DOE Fernald Site

    International Nuclear Information System (INIS)

    Cossman, R.L.

    1994-01-01

    The Fernald Environmental Restoration Management Corporation (FERMCO) took great strides in the development of cost estimates at Fernald. There have been many opportunities to improve on how the policies and procedures pertaining to cost estimates were to be implemented. As FERMCO took over the existing Fernald facility, the Project Controls Division began to format the estimating procedures and tools to do business at Fernald. The Estimating Department looked at the problems that pre-existed at the site. One of the key problems that FERMCO encountered was how to summarized the direct and indirect accounts of each subcontracted estimate. Direct costs were broken down by prime and sub-prime accounts. This presented a level of detail that had not been experienced at the site before; it also created many issues concerning accounts and definitions to be applied to ''all other accounts associated with a project.'' Existing subcontract indirect cost accounts were reviewed from existing historical estimates. It was found that some were very detailed and some were not. The Estimating Department was given the task of standardizing the accounts and percentages for each of the subcontractor indirect costs. Then, as the project progressed, the percentages could be revised with actual estimates, subcontract comparisons, or with level of effort (LOE) accounts, which would represent qualified people assigned a task for the completion of each project. The approach is to assign particular employees to perform a specific task within a project from start to finish, and then to reassign the individual(s) to a new project (if it was available) integrating the expertise available with the skills required by the other operable units

  17. Clinch River Environmental Restoration Program

    International Nuclear Information System (INIS)

    Cook, R.B.

    1992-01-01

    This report consists of tables and listings from the results of the Phase I data gathering activities of the Clinch River Environmental Restoration Program (CR-ERP). The table of contents outlines the presentation of the material and has been annotated to indicate the key fields used to order the printing of each data table. Definitions of selected column headings are provided. Sample collection information is shown first and then more specific information for each matrix type is presented. The analytical results have been reviewed by independent validators and the qualifiers shown are the results of their efforts. No data that were rejected by the validation process are included in this listing. Only results of routine samples are listed; quality control sample results were excluded. All data, both detected and nondetected values, were used to calculated the summary table values. However, only Detected values are given on the analyte specific listings

  18. The Role Of Land Use In Environmental Decision Making At Three DOE Mega-Cleanup Sites, Fernald, Rocky Flats, and Mound

    International Nuclear Information System (INIS)

    Jewett, M.A.

    2011-01-01

    This paper explores the role that future land use decisions have played in the establishment of cost-effective cleanup objectives and the setting of environmental media cleanup levels for the three major U.S. Department of Energy (DOE) sites for which cleanup has now been successfully completed: the Rocky Flats, Mound, and Fernald Closure Sites. At each site, there are distinct consensus-building histories throughout the following four phases: (1) the facility shut-down and site investigation phase, which took place at the completion of their Cold War nuclear-material production missions; (2) the decision-making phase, whereby stakeholder and regulatory-agency consensus was achieved for the future land-use-based environmental decisions confronting the sites; (3) the remedy selection phase, whereby appropriate remedial actions were identified to achieve the future land-use-based decisions; and (4) the implementation phase, whereby the selected remedial actions for these high-profile sites were implemented and successfully closed out. At each of the three projects, there were strained relationships and distrust between the local community and the DOE as a result of site contamination and potential health effects to the workers and local residents. To engage citizens and interested stakeholder groups - particularly in the role of final land use in the decision-making process, the site management teams at each respective site developed new public-participation strategies to open stakeholder communication channels with site leadership, technical staff, and the regulatory agencies. This action proved invaluable to the success of the projects and reaching consensus on appropriate levels of cleanup. With the implementation of the cleanup remedies now complete, each of the three DOE sites have become models for future environmental-remediation projects and associated decision making.

  19. Mobile Work Platform - A Fluor Fernald innovative dismantlement technology

    Energy Technology Data Exchange (ETDEWEB)

    Mark S. Peters; Paul R. Cromer; Robert Danner

    2000-06-16

    The Department of Energy's (DOE) Office of Science and Technology Decontamination and Decommissioning (D&D) Focus Area, led by the National Energy Technology Laboratory, has been charged with finding new and innovative D&D technologies and then validating through field demonstration that the technologies are safer, faster and/or more cost-effective. The D&D Focus Area's approach to verifying the benefits of the improved D&D technologies is to use them at DOE sites in large-scale demonstration and deployment (LSDD) projects. The DOE's Fernald Environmental Management Project (FEMP), near Cincinnati Ohio, was host for a LSDD Project overseen by the D&D Focus Area. The FEMP was formerly engaged in the production of high quality uranium metal; and is now currently undergoing active environmental restoration, including removal of major process facilities. As observed during the D&D of Fernald's Plant 1, the baseline method for removing piping required laborers to work above the floor on ladders, scaffolding, ardor man-lifts with hand-held power tools. The pipe must first be rigged to prevent falling when cut. After cutting, the pipe is manually lowered to the ground and placed in a storage/disposal container. The Mobile Work Platform (MWP) consists of a mobile chassis, telescoping arm and a dual crimper/shear ''end-effecter''. It has the capability to grab and hold a pipe, crimp and shear the pipe (up to a ten-foot section) on either side of where it is being held and then lower and place the pipe section into a storage/disposal container. The MWP can crimp/shear up to a 6-inch diameter, schedule 401, carbon steel pipe. A single operator using a radio remote control operates the MWP. The paper will describe the results (productivity, safety advantages and lessons learned) during the Mobile Work Platform demonstration at Fernald.

  20. Mixed wastes management at Fernald: Making it happen quickly, economically and compliantly

    International Nuclear Information System (INIS)

    Witzeman, J.T.; Rast, D.M.

    1996-01-01

    At the end of calender year 1992, the Fernald Environmental Management Project (FEMP) had approximately 12,500 drums of mixed low-level waste in storage and the Fernald Environmental Restoration Management Corporation (FERMCO) had just begun to develop an aggressive project based program to treat and dispose of this mixed waste. By 1996 the FERMCO mixed waste management program had reduced the aforementioned 12,500 drums of waste once in inventory to approximately 5800 drums. Projects are currently in progress to completely eliminate the FEMP inventory of mixed waste. As a result of these initiatives and aggressive project management, the FEMP has become a model for mixed waste handling, treatment and disposal for DOE facilities. Mixed waste management has traditionally been viewed as a singular and complex environmental problem. FERMCO has adopted the viewpoint that treatment and disposal of mixed waste is an engineering project, to be executed in a disciplined fashion with timely and economic results. This approach allows the larger mixed waste management problem to be divided into manageable fractions and managed by project. Each project is managed by problem solving experts, project managers, in lieu of environmental experts. In the project approach, environmental regulations become project requirements for individual resolution, as opposed to what had formerly been viewed as technically unachievable environmental standards

  1. Water Awareness Through Environmental Restoration

    Science.gov (United States)

    Davis-Caldwell, K.

    2012-04-01

    This poster will highlight a series of project based activities carried out at Hammond Elementary School in Laurel, Maryland, USA. All of the featured projects revolve around the school's Green School Initiative or an integral part of the science curricula. The Maryland Green School program was developed by a diverse team of educators representing the Maryland Association for Environmental and Outdoor Education (MAEOE), Office of the Governor, the Maryland Association of Student Councils, Maryland Department of Education, Department of Natural Resources and Maryland Department of the Environment. The program is administered through the Maryland Association for Environmental and Outdoor Education. The Maryland Green Schools Award Program recognizes Maryland schools that include environmental education in the curricula, model best management practices at the school and address community environmental issues. Among these numerous projects water is a common thread. Hammond Elementary School lies within the Chesapeake Bay watershed which stretches across 64,000 square miles and encompasses the entire District of Columbia. Educational components address habitats, tributaries and, the estuary system. The projects being highlighted in the poster will include: Trout to Streams Project: This 4th grade project focuses on the natural filtration system that area trout provide to the local and global waterways. As students learn about the importance of various fish to the watershed, they come to understand the effect of changes in the population of fish species due to consumption and pollution. The service learning project highlighted teaches students about water quality as they raise trout eggs and monitor their development into hatching and later stream release. Buffer Streams Tree Planting Projects: This 5th grade science service learning project allows students to investigate the water quality and conditions of local area streams. This project teaches students the positive

  2. Environmental restoration and waste management

    International Nuclear Information System (INIS)

    Middleman, L.I.

    1989-01-01

    The purpose of this Five-Year Plan is to establish an agenda for compliance and cleanup against which progress will be measured. DOE is committed to an open and participatory process for developing a national priority system for expenditure of funds. This system will be based on scientific principles and risk reduction in terms that are understandable to the public. The Plan will be revised annually, with a five-year planning horizon. For FY 1991--1995, this Plan encompasses total program activities and costs for DOE Corrective Activities, Environmental Restoration, Waste Management Operations, and Applied R ampersand D. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. It also addresses facilities and sites contaminated with or used in the management of those wastes. The Plan does not include the Safety and Health Program (Office of the Assistant Secretary for Environment, Safety, and Health) or programs of the Office of Civilian Radioactive Waste Management. It does include the annual Defense Programs contribution to the Nuclear Waste Fund for disposal of defense high-level waste and research toward characterizing the defense waste form for repository disposal

  3. Environmental Restoration Program Management Control Plan

    International Nuclear Information System (INIS)

    1991-09-01

    This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives

  4. Supporting Fernald Site Closure with Integrated Health and Safety Plans as Documented Safety Analyses

    International Nuclear Information System (INIS)

    Kohler, S.; Brown, T.; Fisk, P.; Krach, F.; Klein, B.

    2004-01-01

    At the Fernald Closure Project (FCP) near Cincinnati, Ohio, environmental restoration activities are supported by Documented Safety Analyses (DSAs) that combine the required project-specific Health and Safety Plans, Safety Basis Requirements (SBRs), and Process Requirements (PRs) into single Integrated Health and Safety Plans (I-HASPs). These integrated DSAs employ Integrated Safety Management methodology in support of simplified restoration and remediation activities that, so far, have resulted in the decontamination and demolition (D and D) of over 200 structures, including eight major nuclear production plants. There is one of twelve nuclear facilities still remaining (Silos containing uranium ore residues) with its own safety basis documentation. This paper presents the status of the FCP's safety basis documentation program, illustrating that all of the former nuclear facilities and activities have now replaced. Basis of Interim Operations (BIOs) with I-HASPs as their safety basis during the closure process

  5. Environmental Restoration Program Roadmap: Strategic program plan

    International Nuclear Information System (INIS)

    1992-01-01

    This document is a strategic plan for accomplishing environmental restoration objectives at the Department of Energy's (DOE) Portsmouth Gaseous Diffusion Plant (PORTS). Waste Management (WM) for environmental restoration activities and integration of these activities into the PORTS WM operations is addressed in this document. The document provides detailed information concerning specific assumptions and activities required to meet DOE's environmental restoration objectives at this site. Environmental contamination at PORTS consists mainly of spent solvents and low level radionuclides. Solvents were used for industrial metal cleaning operations required to maintain the process during operations. Plumes of groundwater contamination resulting from past disposal of these spent solvents in landfills and impoundments extend from several locations within the site. Also, two sludge impoundments associated with a chromate reduction facility were characterized as having soil and groundwater contaminated with hexavalent chromium

  6. Status report: Fernald site remediation

    International Nuclear Information System (INIS)

    Craig, J.R. Jr.; Saric, J.A.; Schneider, T.; Yates, M.K.

    1995-01-01

    The Fernald site is rapidly transitioning from a Remedial Investigation/ Feasibility Study (RI/FS) site to one where design and construction of the remedies dominates. Fernald is one of the first sites in the Department of Energy (DOE) complex to accomplish this task and real physical progress is being made in moving the five operable units through the CERCLA process. Two of the required Records of Decision (ROD) are in hand and all five operable units will have received their RODs (IROD for OU3) by the end of 1995. Pre-design investigations, design work or construction are now in progress on the operable units. The lessons learned from the work done to date include implementing innovations in the RI and FS process as well as effective use of Removal Actions to begin the actual site remediation. Also, forging close working relationships with the Federal and State Regulators, citizens action groups and the Fernald Citizens Task Force has helped move the program forward. The Fernald successes have been achieved by close coordination and cooperation among all groups working on the projects and by application of innovative technologies within the decision making process

  7. The observational approach in environmental restoration

    International Nuclear Information System (INIS)

    Smyth, J.D.; Quinn, R.D.

    1991-07-01

    The US Department of Energy (DOE) has committed to completing environmental restoration of its facilities within the next 28 years (DOE 1990b). In order to achieve this, DOE must ensure that its restoration activities are both effective and efficient. A key aspect of fulfilling this commitment is the recognition and management of uncertainty that is inherent in waste-site clean-up actions. The DOE Office of Environmental Restoration (DOE-ER) requested Pacific Northwest Laboratory (PNL) to investigate the applicability and implementation of what is known as the ''observational approach'' to better address these needs. PNL's initial investigation resulted in the positive conclusion that the observational approach had potential benefit to DOE during environmental restoration. In a follow-on effort, PNL supported by CH2M HILL, has been providing guidance to DOE field-offices on observational approach fundamentals, implementation, and application to waste-site remediation. This paper outlines the fundamentals of the observational approach and discusses the progress in integrating the observational approach in DOE's environmental restoration efforts. 9 refs., 2 figs

  8. Environmental Restoration Program Control Management System

    International Nuclear Information System (INIS)

    Duke, R.T.

    1992-01-01

    Environmental Restoration managers need to demonstrate that their programs are under control. Unlike most industrial programs, the public is heavily involved in Environmental Restoration activities. The public is demanding that the country prove that real progress is being made towards cleaning up the environment. A Program Control Management System can fill this need. It provides a structure for planning, work authorization, data accumulation, data analysis and change control. But it takes time to implement a control system and the public is losing its patience. This paper describes critical items essential to the quick development and implementation of a successful control system

  9. Environmental Restoration Information Resource Management Program Plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program's essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan

  10. Predicting environmental restoration activities through static simulation

    International Nuclear Information System (INIS)

    Ross, T.L.; King, D.A.; Wilkins, M.L.; Forward, M.F.

    1994-12-01

    This paper discusses a static simulation model that predicts several performance measures of environmental restoration activities over different remedial strategies. Basic model operation consists of manipulating and processing waste streams via selecting and applying remedial technologies according to the strategy. Performance measure prediction is possible for contaminated soil, solid waste, surface water, groundwater, storage tank, and facility sites. Simulations are performed for the U.S. Department of Energy in support of its Programmatic Environmental Impact Statement

  11. Cost Estimating Handbook for Environmental Restoration

    International Nuclear Information System (INIS)

    1993-01-01

    Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals

  12. Cost Estimating Handbook for Environmental Restoration

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-09-01

    Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals.

  13. Establishing a comprehensive risk assessment document for Fernald

    International Nuclear Information System (INIS)

    Nelson, K.A.; Janke, R.C.

    1995-01-01

    While in active operation from 1952 until 1989, the Feed Material Production Center (FMPC),currently referred to as the Fernald Environmental Management Project (FEMP), produced highly purified uranium metal for ultimate use in the manufacture of nuclear weapons. In 1986 the U.S. Environmental Protection Agency (EPA) and the DOE entered into a Federal Facility Compliance Agreement covering environmental impacts associated with the FMPC. In response to the FFCA, a sitewide Remedial Investigation/Feasibility Study (RI/FS) was initiated. Production was permanently suspended at the facility in 1989, and the focus has since shifted to environmental restoration and waste management activities. The original RI/FS work plan identified 39 units, but these were later categorized and grouped into 5 larger, more manageable units as follows: (1) operable unit 1 - waste pit area; (2) operable unit 2 - other solid waste units; (3) operable unit 3 - former production area; (4) operable unit 4- silos I through 4; and (5) operable unit 5 - environmental media. On June 29, 1990, a consent agreement (under Sec. 120 and 106[a] of CERCLA) between the DOE and EPA became effective. The purpose of this agreement was to achieve consistency between the operable units and ensure commitments to the RI/FS program without altering the underlying objectives. The consent agreement was amended the following year to revise the schedules for completing the remediation of the five operable units and to direct operable unit integration to ensure compliance with the residual risk requirements of the National Hazardous Substances and Oil Contingency Plan. This Amended Consent Agreement (ACA) was signed on September 20, 1991, and became effective on December 19, 1991. In accordance with provisions of the ACA, a methodology has been prepared for performing risk assessments and establishing risk-based remedial action goals at the FEMP

  14. Russian: United States Environmental Restoration Workshop

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    The Russian - United States Environmental Restoration Workshop, held in Washington, D.C., and Richland, Washington, from April 5 through 18, 1993, was the first extended collaborative information exchange between the US Department of Energy (DOE) and Russian scientists at the site level. In addition to the Russian scientists, workshop participants included scientists and staff from DOE, Pacific Northwest Laboratory (PNL), Westinghouse Hanford Company (WHC), the US Environmental Training Institute (USETI), universities, and the private sector. The first week (April 5 through 10) of the workshop took place in Washington, D.C., where the Russian and US participants were presented with a US perspective on environmental restoration and remediation issues from representatives in DOE and the US Environmental Protection Agency (EPA). The second week (April 11 through 18) occurred in Richland, Washington, where the participants were presented with site-specific environmental restoration and remediation issues related to Hanford Site cleanup. This report is a compilation of the presentations, discussions, and experiences shared during the second week of the workshop in Richland, Washington.

  15. Environmental guidance for public participation in environmental restoration activities

    Energy Technology Data Exchange (ETDEWEB)

    1991-11-01

    The US Department of Energy (DOE) is issuing this document, entitled Guidance on Public Participation for US Department of Energy Environmental Restoration Activities, to summarize policy and provide guidance for public participation in environmental restoration activities at DOE Headquarters, Field Offices, facilities, and laboratories. While the Office of Environmental Restoration and Waste Management (EM) has environmental restoration responsibility for the majority of DOE sites and facilities, other DOE Project Offices have similar responsibilities at their sites and facilities. This guidance is applicable to all environment restoration activities conducted by or for DOE under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA); the Resource Conservation and Recovery Act of 1976 (RCRA) as amended by the Hazardous and Solid Waste Amendments of 1984 (HSWA) (corrective actions only); and the National Environmental Policy Act of 1969 (NEPA). This guidance also is applicable to CERCLA remedial action programs under the Uranium Mill Tailings Radiation Control Act of 1978 and the Formerly Utilized Sites Remedial Action Program, where DOE is the designated lead. The primary objectives of this guidance document are as follows: acclimate DOE staff to a changing culture that emphasizes the importance of public participation activities; provide direction on implementing these public participation activities; and, provide consistent guidance for all DOE Field Offices and facilities. The purpose of this document is to provide guidance on conducting effective public participation activities for environmental restoration activities under CERCLA; RCRA corrective actions under sections 3004(u), 3004(v), and 3008(h); and NEPA public participation activities.

  16. Authorized limits for Fernald copper ingots

    International Nuclear Information System (INIS)

    Frink, N.; Kamboj, S.; Hensley, J.; Chen, S.Y.

    1997-09-01

    This development document contains data and analysis to support the approval of authorized limits for the unrestricted release of 59 t of copper ingots containing residual radioactive material from the U.S. Department of Energy (DOE) Fernald Environmental Management Project (FEMP). The analysis presented in this document comply with the requirements of DOE Order 5400.5, open-quotes Radiation Protection of the Public and the Environment,close quotes as well as the requirements of the proposed promulgation of this order as 10 CFR Part 834. The document was developed following the step-by-step process described in the Draft Handbook for Controlling Release for Reuse or Recycle Property Containing Residual Radioactive Material

  17. Authorized limits for Fernald copper ingots

    Energy Technology Data Exchange (ETDEWEB)

    Frink, N.; Kamboj, S.; Hensley, J.; Chen, S. Y.

    1997-09-01

    This development document contains data and analysis to support the approval of authorized limits for the unrestricted release of 59 t of copper ingots containing residual radioactive material from the U.S. Department of Energy (DOE) Fernald Environmental Management Project (FEMP). The analysis presented in this document comply with the requirements of DOE Order 5400.5, {open_quotes}Radiation Protection of the Public and the Environment,{close_quotes} as well as the requirements of the proposed promulgation of this order as 10 CFR Part 834. The document was developed following the step-by-step process described in the Draft Handbook for Controlling Release for Reuse or Recycle Property Containing Residual Radioactive Material.

  18. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  19. 1998 Annual Report - Environmental Restoration Division

    International Nuclear Information System (INIS)

    Davis, L.B.

    1998-01-01

    This is a 1998 annual report for Environmental Restoration. Environmental Restoration's accomplishments were significant in 1998. The division, including its support organizations, completed one year without a lost time accident. It also met 111 enforceable agreement milestones on time, with more than 80% ahead of schedule. Funds used to meet these milestones were effectively utilized and $9.63 million in regulatory scope was added. Twelve new, innovative technologies were deployed, enabling ER to achieve significant progress on major field remediation projects, including: Remediation of 25 acres of radioactive burial ground; Removal of 1,300 batteries for recycling; Removal and safe storage of a radioactive underground tank; Extraction of 115,000 pounds of solvent; and Installation of 9 new recirculation wells and a second GeoSiphon Cell for additional removal of solvent Final Records of Decision were made for 9 base unit sites. No Further Action decisions were made for 61 additional sites

  20. Technology needs assessment for DOE environmental restoration programs

    International Nuclear Information System (INIS)

    Duray, J.R.; Carlson, T.J.; Carpenter, C.E.; Cummins, L.E.; Daub, G.J.

    1992-01-01

    The 'Technology Needs Assessment Final Report' describes current and planned environmental restoration activity, identifies technologies intended to be used or under consideration, and ranks technology deficiencies in the U.S. Department of Energy's environmental restoration program. Included in the ranking are treatment technologies, characterization technologies, and non-technology issues that affect environmental restoration. Data used for the assessment was gathered during interviews in the spring of 1991 with DOE site personnel responsible for the environmental restoration work. (author)

  1. Decontamination and dismantlement of Plant 7 at Fernald

    International Nuclear Information System (INIS)

    Albertin, M.; Borgman, T.; Zebick, B.

    1994-01-01

    Decontamination and dismantlement (D ampersand D) tasks have been successfully completed on Plant 7 at the Fernald Environmental Management Project. The seven story facility was radiologically, chemically, and biologically contaminated. The work involved the D ampersand D work beginning with safe shutdown and gross decontamination, and ended with removal of the structural steel. A series of lessons learned were gained which include use of explosives, bidding tactics, safe shutdown, building decontamination and lockdown, use of seam climbers, etc

  2. Factors for formulating strategies for environmental restoration

    International Nuclear Information System (INIS)

    1998-07-01

    This publication focusses on factors which are important for formulating a strategy for environmental restoration. In parallel to this effort, the IAEA has conducted activities in related areas which have been reported in companion reports dealing with (1) the characterization of radioactively contaminated sites for remediation purposes and (2) available technology for cleanup and remediation of radioactively contaminated sites. Additionally, follow-up activities will focus on two other areas, viz. planning and management options for cleanup of contaminated groundwater, and post-restoration monitoring of decommissioned sites. In a separate initiative the IAEA has developed preliminary guidance on radiological criteria for determining when cleanup action is needed and for deciding on when areas have been cleaned up to a sufficient extent. It is also concerned with radioactive contamination of soils, groundwaters, structures and biota which may have the potential for harm to people. It is intended that it will serve as an important source of information and data on the key factors to be considered in the formulation of an environmental restoration strategy

  3. Technology needs for environmental restoration remedial action

    Energy Technology Data Exchange (ETDEWEB)

    Watson, J.S.

    1992-11-01

    This report summarizes the current view of the most important technology needs for the US Department of Energy (DOE) facilities operated by Martin Marietta Energy Systems, Inc. These facilities are the Oak Ridge National Laboratory, the Oak Ridge K-25 Site, the Oak Ridge Y-12 Plant, the Paducah Gaseous Diffusion Plant, and the Portsmouth Gaseous Diffusion Plant. The sources of information used in this assessment were a survey of selected representatives of the Environmental Restoration (ER) programs at each facility, results from a questionnaire distributed by Geotech CWM, Inc., for DOE, and associated discussions with individuals from each facility. This is not a final assessment, but a brief look at an ongoing assessment; the needs will change as the plans for restoration change and, it is hoped, as some technical problems are solved through successful development programs.

  4. Technology needs for environmental restoration remedial action

    International Nuclear Information System (INIS)

    Watson, J.S.

    1992-11-01

    This report summarizes the current view of the most important technology needs for the US Department of Energy (DOE) facilities operated by Martin Marietta Energy Systems, Inc. These facilities are the Oak Ridge National Laboratory, the Oak Ridge K-25 Site, the Oak Ridge Y-12 Plant, the Paducah Gaseous Diffusion Plant, and the Portsmouth Gaseous Diffusion Plant. The sources of information used in this assessment were a survey of selected representatives of the Environmental Restoration (ER) programs at each facility, results from a questionnaire distributed by Geotech CWM, Inc., for DOE, and associated discussions with individuals from each facility. This is not a final assessment, but a brief look at an ongoing assessment; the needs will change as the plans for restoration change and, it is hoped, as some technical problems are solved through successful development programs

  5. Uranium mining environmental restoration project (PRAMU)

    International Nuclear Information System (INIS)

    Asenjo, A.

    2002-01-01

    The National Atomic Energy Commission (CNEA) started its activities 50 years ago and obtained significant results. At the present time, the CNEA is defined as an Institution of research and development in the nuclear field. It is also responsible for the management of radioactive wastes and the dismantling of nuclear and radioactive facilities. Mining and milling activities have been carried out during the past 40 years and at present the CNEA is undertaking the Uranium Mining Environmental Restoration Project (PRAMU). The aim of this project is to restore the environment as much as is possible in all places where uranium mining and milling activities were developed when taking into consideration both economic and technical reality. First, the characteristics of the problems in each site are determined through appropriate studies which identify the existing or potential impacts, the possible pathways of contamination, etc. The sites being studied are: MALARGUE (Mendoza Province), CORDOBA (Cordoba Province), LOS GIGANTES (Cordoba Province), HUEMUL (Mendoza Province), PICHINAN (Chubut Province), TONCO (Salta Province), LA ESTELA (San Luis Province), LOS COLORADOS (La Rioja Province). PRAMU seeks to improve the current conditions of the tailings deposits and mines and to ensure the long term protection of people and the environment. The CNEA is required to comply with all legislation that is in force and is under the control of various national, provincial and local State institutions. The main objectives of the project for the various sites are: (a) Malargue site: to implement the actions necessary for environmental restoration and management of the tailings derived from the uranium ores processed in the industrial plant; (b) Cordoba and Los Gigantes sites: to design, engineer and execute the activities required for closure of the sites; (c) Other sites (Huemul, Pichinan, Tonco, La Estela, Los Colorados): to develop an environmental evaluation and, on the basis of

  6. Planning for and managing environmental restoration waste

    International Nuclear Information System (INIS)

    Miller, J.Q.

    1993-01-01

    This paper describes the approach used to support the management of environmental restoration (ER) waste. A general description is provided of the tools and techniques that have been developed and applied to produce waste generation forecast data and treatment, storage, and disposal capacity needs. The ER Program can now consistently manage ER waste streams from initial generation through ultimate disposal. Utilizing the valuable information that results from application of strategically planned systems and techniques demonstrates the ability to provide the necessary waste management support for the ER cleanup process

  7. Environmental restoration value engineering guidance document

    International Nuclear Information System (INIS)

    1995-07-01

    This document provides guidance on Value Engineering (VE). VE is an organized team effort led by a person trained in the methodology to analyze the functions of projects, systems, equipment, facilities, services, and processes for achieving the essential functions at the lowest life cycle cost while maintaining required performance, reliability, availability, quality, and safety. VE has proven to be a superior tool to improve up-front project planning, cut costs, and create a better value for each dollar spent. This document forms the basis for the Environmental Restoration VE Program, describes the VE process, and provides recommendations on when it can be most useful on ER projects

  8. Cost avoidance realized through transportation and disposal of Fernald mixed low-level waste

    International Nuclear Information System (INIS)

    Sparks, A.K.; Dilday, D.R.; Rast, D.M.

    1995-11-01

    Currently, Department of Energy (DOE) facilities are undergoing a transformation from shipping radiologically contaminated waste within the DOE structure for disposal to now include Mixed Low Level Waste (MLLW) shipments to a permitted commercial disposal facility (PCDF) final disposition. Implementing this change can be confusing and is perceived as being more difficult than it actually is. Lack of experience and disposal capacity, sometimes and/or confusing regulatory guidance, and expense of transportation and disposal of MLLW ar contributing factors to many DOE facilities opting to simply store their MLLW. Fernald Environmental Restoration Management Company (FERMCO) established itself as a leader i addressing MLLW transportation and disposal by being one of the first DOE facilities to ship mixed waste to a PCDF (Envirocare of Utah) for disposal. FERMCO's proactive approach in establishing a MLLW Disposal Program produces long-term cost savings while generating interim mixed waste storage space to support FERMCO's cleanup mission. FERMCO's goal for all MLLW shipments was to develop a cost efficient system to accurately characterize, sample and analyze the waste, prepare containers and shipping paperwork, and achieve regulatory compliance while satisfying disposal facility waste acceptance criteria (WAC). This goal required the ability to evolve with the regulations, to address waste streams of varying matrices and contaminants, and to learn from each MLLW shipment campaign. These efforts have produced a successful MLLW Disposal Program at the Fernald Environmental Management Project (FEMP). FERMCO has a massed lessons learned from development of this fledgling program which may be applied complex-wide to ultimately save facilities time and money traditionally wasted by maintaining the status quo

  9. Cost avoidance techniques through the Fernald controlled area trash segregation program and the RIMIA solid waste reduction program

    International Nuclear Information System (INIS)

    Menche, C.E.

    1997-01-01

    The Fernald Environmental Management Project is a Department of Energy owned facility that produced high quality uranium metals for military defense. The Fernald mission has changed from one of production to remediation. Remediation is intended to clean up legacy (primary) waste from past practices. Little opportunity is available to reduce the amount of primary waste. However, there is an opportunity to reduce secondary waste generation, primarily through segregation. Two programs which accomplish this are the Controlled Area Trash Segregation Program and the RIMIA Solid Waste Reduction Program. With these two programs now in place at the FEMP, it has been estimated that a 60% reduction has been achieved in unnecessary clean waste being disposed as Low Level Waste at the Nevada Test Site. The cost savings associated with these programs (currently 79,000 cubic feet, $428,000) could easily run into the millions of dollars based on the upcoming restoration activities to be undertaken. The segregation of non-radiological waste in the radiologically Controlled Area not only establishes a firm commitment to send only low-level radioactive waste to the Nevada Test Site, but also results in substantial cost avoidance

  10. Environmental Restoration Remedial Action Program records management plan

    International Nuclear Information System (INIS)

    Michael, L.E.

    1991-07-01

    The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan [(FOMP) DOE-RL 1989] describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document [(QARD) DOE-RL 1991], provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig

  11. Involving stakeholders in evaluating environmental restoration technologies

    International Nuclear Information System (INIS)

    McCabe, G.H.; Serie, P.J.

    1993-02-01

    Involving citizens, interest groups, and regulators in environmental restoration and waste management programs is a challenge for government agencies and the organizations that support them. To be effective, such involvement activities must identify all individuals and groups who have a stake in the cleanup. Their participation must be early, substantive, and meaningful. Stockholders must be able to see how their input was considered and used, and feel that a good- faith effort was made to reconcile conflicting objectives. The Integrated Demonstration for Cleanup of Volatile Organic Compounds at Arid Sites (VOC-Arid ID) is a Department of Energy Office of Technology Development project located at Hanford. Along with technical evaluation of innovative cleanup technologies, the program is conducting an institutional assessment of regulatory and public acceptance of new technologies. Through a series of interviews and workshops, and use of a computerized information management tool, stakeholders are having a voice in the evaluation. Public and regulatory reaction has been positive

  12. Fernald waste management and disposition

    International Nuclear Information System (INIS)

    West, M.L.; Fisher, L.A.; Frost, M.L.; Rast, D.M.

    1995-01-01

    Historically waste management within the Department of Energy complex has evolved around the operating principle of packaging waste generated and storing until a later date. In many cases wastes were delivered to onsite waste management organizations with little or no traceability to origin of generation. Sites then stored their waste for later disposition offsite or onsite burial. While the wastes were stored, sites incurred additional labor costs for maintaining, inspecting and repackaging containers and capital costs for storage warehouses. Increased costs, combined with the inherent safety hazards associated with storage of hazardous material make these practices less attractive. This paper will describe the methods used at the Department of Energy's Fernald site by the Waste Programs Management Division to integrate with other site divisions to plan in situ waste characterization prior to removal. This information was utilized to evaluate and select disposal options and then to package and ship removed wastes without storage

  13. Decontamination and decommissioning of Plant 7 at the Fernald Facility

    International Nuclear Information System (INIS)

    Motl, G.P.; Borgman, T.

    1994-01-01

    The Fernald Environmental Management Project (FEMP), formerly the Feed Materials Production Center (FMPC), is a Department of Energy (DOE) site which produced high-quality uranium for military defense beginning in 1951. Production at the FEMP was halted in July 1989. Later that year, the facility was placed on the National Priorities List (NPL). The DOE is currently conducting a Remedial Investigation/Feasibility Study (RI/FS) and other response actions under the Amended Consent Agreement between the US Environmental Protection Agency (USEPA) and the DOE

  14. Environmental restoration and statistics: Issues and needs

    International Nuclear Information System (INIS)

    Gilbert, R.O.

    1991-10-01

    Statisticians have a vital role to play in environmental restoration (ER) activities. One facet of that role is to point out where additional work is needed to develop statistical sampling plans and data analyses that meet the needs of ER. This paper is an attempt to show where statistics fits into the ER process. The statistician, as member of the ER planning team, works collaboratively with the team to develop the site characterization sampling design, so that data of the quality and quantity required by the specified data quality objectives (DQOs) are obtained. At the same time, the statistician works with the rest of the planning team to design and implement, when appropriate, the observational approach to streamline the ER process and reduce costs. The statistician will also provide the expertise needed to select or develop appropriate tools for statistical analysis that are suited for problems that are common to waste-site data. These data problems include highly heterogeneous waste forms, large variability in concentrations over space, correlated data, data that do not have a normal (Gaussian) distribution, and measurements below detection limits. Other problems include environmental transport and risk models that yield highly uncertain predictions, and the need to effectively communicate to the public highly technical information, such as sampling plans, site characterization data, statistical analysis results, and risk estimates. Even though some statistical analysis methods are available ''off the shelf'' for use in ER, these problems require the development of additional statistical tools, as discussed in this paper. 29 refs

  15. Development of decontamination, decommissioning and environmental restoration technology

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Byung Jik; Kwon, H. S.; Kim, G. N. and others

    1999-03-01

    Through the project of 'Development of decontamination, decommissioning and environmental restoration technology', the followings were studied. 1. Development of decontamination and repair technology for nuclear fuel cycle facilities 2. Development of dismantling technology 3. Development of environmental restoration technology. (author)

  16. Sustainable Design and Construction of the Fernald Preserve Visitors Center

    International Nuclear Information System (INIS)

    Powell, J.; Sizemore, M.; Cornils, K.

    2009-01-01

    In September 2008, the Fernald Preserve Visitors Center was awarded the platinum certification level by the US Green Building Council (USGBC), the highest level achievable under the Leadership in Energy and Environmental Design New Construction and Major Renovations (LEED-NC) rating system. The Visitors Center, which is maintained and operated under the direction of the U.S. Department of Energy (DOE) Office of Legacy Management, is the first building in Ohio, the second DOE building and one of approximately 100 buildings worldwide to achieve platinum certification. As a sustainable building, the Visitors Center includes a ground source heat pump, a bio-treatment wetland system, recycled construction materials, native and no-irrigation plants and numerous other components to reduce energy, electricity, and water consumption and to lessen the building's impact on the environment. The building's conceptual design was originally developed by the University of Cincinnati's College of Design, Architecture, Art and Planning (DAAP), with input from the community, and the building was designed and built by the Megen Construction Company-glaserworks team, under the direction of S.M. Stoller, Corporation, the Legacy Management contractor for the Fernald Preserve and the DOE Office of Legacy Management. The project required a committed effort by all members of the project team. This is the first sustainable building constructed as part of the cleanup of the environmental legacy of the Cold War. The Visitors Center's exhibits, reading room, and programs will help to educate the community about the Fernald Preserve's environmental legacy and show how our decisions affect the environment. (authors)

  17. Environmental restoration plans and activities in Kazakhstan

    International Nuclear Information System (INIS)

    Kim, A.

    1997-01-01

    During the period of uranium mining activities in the Republic of Kazakhstan so far more gm 200 million tonnes of radioactive waste with a total activity of about 250,000 Ci has accumulated. The problem of environmental restoration of contaminated uranium mining and milling sites is very topical and important for Kazakhstan. This paper presents the radiological status of the situation in Kazakhstan, the characteristics of the uranium mining and mill tailings and the approach to the tailings management for stabilization and isolation from the human environment. Legislation in the field of atomic energy including radwaste management has been established in Kazakhstan through a structure of State Bodies such as Ministries of Science, Ecology, Bioresources, Health and Atomic Energy Agency. An organization for radiation safety regulation has also been created. Studies regarding stabilization of radiological situation have been started in Kazakhstan with the support of IAEA and EU. This paper deals with the regional project for assessment of immediate measures to be taken for remediation of uranium mining and mill tailings sites. (author)

  18. Environmental restoration remedial action quality assurance requirements document

    International Nuclear Information System (INIS)

    Cote, R.F.

    1991-01-01

    The environmental Restoration Remedial Action Quality Assurance Requirements Document (DOE/RL 90-28) defines the quality assurance program requirements for the US Department of Energy-Richland Field Office Environmental Restoration Remedial Action Program at the Hanford Site, Richland, Washington. This paper describes the objectives outlined in DOE/RL 90-28. The Environmental Restoration Remedial Action Program implements significant commitments made by the US Department of Energy in the Hanford Federal Facility Agreement and Consent Order entered into with the Washington State Department of Ecology and the US Environmental Protection Agency

  19. Restoring Environmental Flows by Modifying Dam Operations

    Directory of Open Access Journals (Sweden)

    Brian D. Richter

    2007-06-01

    Full Text Available The construction of new dams has become one of the most controversial issues in global efforts to alleviate poverty, improve human health, and strengthen regional economies. Unfortunately, this controversy has overshadowed the tremendous opportunity that exists for modifying the operations of existing dams to recover many of the environmental and social benefits of healthy ecosystems that have been compromised by present modes of dam operation. The potential benefits of dam "re-operation" include recovery of fish, shellfish, and other wildlife populations valued both commercially and recreationally, including estuarine species; reactivation of the flood storage and water purification benefits that occur when floods are allowed to flow into floodplain forests and wetlands; regaining some semblance of the naturally dynamic balance between river erosion and sedimentation that shapes physical habitat complexity, and arresting problems associated with geomorphic imbalances; cultural and spiritual uses of rivers; and many other socially valued products and services. This paper describes an assessment framework that can be used to evaluate the benefits that might be restored through dam re-operation. Assessing the potential benefits of dam re-operation begins by characterizing the dam's effects on the river flow regime, and formulating hypotheses about the ecological and social benefits that might be restored by releasing water from the dam in a manner that more closely resembles natural flow patterns. These hypotheses can be tested by implementing a re-operation plan, tracking the response of the ecosystem, and continually refining dam operations through adaptive management. The paper highlights a number of land and water management strategies useful in implementing a dam re-operation plan, with reference to a variety of management contexts ranging from individual dams to cascades of dams along a river to regional energy grids. Because many of the

  20. Efforts to Improve Efficiency of Extraction Well Operation at the Fernald Preserve, Harrison, Ohio – 16177

    Energy Technology Data Exchange (ETDEWEB)

    Glassmeyer, Cathy [Navarro Research and Engineering; Hooten, Gwen [U.S. Department of Energy, Office of Legacy Management; Hertel, Bill [Navarro Research and Engineering; Broberg, Ken [Nararro Research and Engineering

    2016-03-01

    The Fernald Preserve, a former uranium processing facility that produced high-purity uranium metal products during the Cold War, is located in southwest Ohio. The facility became a US Department of Energy Office of Legacy Management (LM) site in November 2006, following completion of the Comprehensive Environmental Response, Compensation, and Liability Act environmental remediation and site restoration (with the exception of groundwater). When the site was turned over to LM, approximately 76.5 ha of the Great Miami Aquifer remained contaminated with uranium above the final remediation level of 30 μg/L. Here, uranium contamination is being removed from groundwater in the Great Miami Aquifer through a pump-and-treat operation, which is predicted to continue until 2033. Twenty extraction wells pump about 30 million liters per day. Operation of the system is impacted by iron in the groundwater that promotes iron fouling of the well pumps, motors, and screens. The design of the well field evolved over 21 years and reflected a conservative system that could respond to a wide range of pumping conditions. For instance, some of the extraction wells were sized with pumps and motors that would allow the well to pump up to 1890 L/min (500 gpm) if warranted. The added flexibility, though, came at the cost of operational efficiency. We describe the efforts that have been taken by LM since the Fernald site was transferred to LM to mitigate the operational impacts from the iron fouling aquifer conditions and improve the efficiency of the well-field operation. Variable-frequency drives were installed at six wells to replace flow control valves. Several wells with oversized pumps and motors were changed from 24-hour per day operation to 8-hour per day operation to allow the pumps to operate closer to their design flow rates. Pumps and motors were “right-sized” at many wells to improve pumping efficiency. The process used to rehabilitate (or clean) well screens was improved, and

  1. Re-injection accelerates groundwater clean up at Fernald, Fluor Fernald, Inc

    International Nuclear Information System (INIS)

    Dave Brettschneider; William Hertel; Ken Broberg

    2000-01-01

    A successful one year long, field scale demonstration of the use of groundwater re-infection at Fernald was recently completed bringing DOE one step closer to achieving an accelerated site remediation (DOE 2000). The demonstration marks the end of a several year effort to evaluate whether: re-injection could be conducted efficiently at Fernald, and if the approved aquifer remedy at Fernald would benefit by incorporating re-infection. Evaluation of re-injection technology involved not only technical considerations, but also participation and cooperation of regulators and stakeholders. The demonstration was considered to be unique in that it was integrated into the design of the current approved aquifer remedy and utilized the existing remediation infrastructure. Information collected during the demonstration indicated that re-injection wells could be operated efficiently at Fernald and that the current approved groundwater remedy should be modified to include the use of re-injection

  2. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  3. Fernald - As Closure Approaches Changing Public Participation Is Not an Easy (or Popular) Task

    International Nuclear Information System (INIS)

    Wagner, J.

    2006-01-01

    Public participation at a closure site evolves. In large part it's driven by the players - neighbors, DOE, contractors, regulators and to some extent, the media. At Fernald, public participation became an integral part of the decision making process in the late 80's. At that time the Department of Energy was really just beginning to understand the extent of environmental contamination caused by 40 years of uranium metal production. Today, as cleanup nears an end (Figure 1), the Fernald Citizens Advisory Board and other key stakeholders stand at a crossroads. The DOE Office of Environmental Management is working with the Office of Legacy Management and its' contractors as they prepare to take over stewardship of the site. DOE is chartering Local Stakeholder Organizations, LSO's, made up of elected officials to serve as the voice of the public. The transition at Fernald will likely be more difficult than at other cleanup sites. Many area stakeholders have 20 years of time committed to this project. For most, Fernald was an emotional subject that effected their community and families. Change is not easy. (authors)

  4. Richland Environmental Restoration Project management action process document

    International Nuclear Information System (INIS)

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines

  5. DOE model conference on waste management and environmental restoration

    International Nuclear Information System (INIS)

    1990-01-01

    Reports dealing with current topics in waste management and environmental restoration were presented at this conference in six sessions. Session 1 covered the ''Hot Topics'' including regulations and risk assessment. Session 2 dealt with waste reduction and minimization; session 3 dealt with waste treatment and disposal. Session 4 covered site characterization and analysis. Environmental restoration and associated technologies wee discussed in session 5 and 6. Individual papers have been cataloged separately

  6. DOE model conference on waste management and environmental restoration

    Energy Technology Data Exchange (ETDEWEB)

    1990-01-01

    Reports dealing with current topics in waste management and environmental restoration were presented at this conference in six sessions. Session 1 covered the Hot Topics'' including regulations and risk assessment. Session 2 dealt with waste reduction and minimization; session 3 dealt with waste treatment and disposal. Session 4 covered site characterization and analysis. Environmental restoration and associated technologies wee discussed in session 5 and 6. Individual papers have been cataloged separately.

  7. Richland Environmental Restoration Project management action process document

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  8. The SWAMI inspection robot: Fernald site requirements

    International Nuclear Information System (INIS)

    Hazen, F.B.

    1993-01-01

    The purpose of this document is to introduce and describe the Stored Waste Autonomous Mobile Inspector (SWAMI) robot project and to identify issues that will need to be addressed prior to its field demonstration at Fernald in mid-1995. SWAMI is a mobile robotic vehicle that will perform mandated weekly inspections of waste containers. Fernald has a large inventory of these containers and a need to protect workers from radiation hazards while enhancing the efficiency and effectiveness of the inspections. Fernald's role in this project is to supply the demonstration site and make all necessary preparations. This includes identification of the test areas and plans, and identification and compliance to Federal, State, DOE, and Site regulations on system safety and quality. In addition, Fernald will link SWAMI output images to off-line mass data storage, and also to an on-line ORACLE database. The authors shall initiate a dialog with State and Federal regulators towards the near term goal of acceptance of the SWAMI test plan and a longer term goal of acceptance of SWAMI as a supplement and improvement to present mandated RCRA inspections

  9. Planning for Environmental Restoration in Slovak Republic

    International Nuclear Information System (INIS)

    Slavik, O.; Moravek, J.

    1995-01-01

    The restoration in the Slovak Republic concerns to the contaminated banks of the waste water recipient of the Bohunice Nuclear Power Plant. The identified contamination, consisting mainly of 137 Cs, is a result of two accidents on the CO 2 -cooled and heavy water moderated NPP Bohunice-A1 unit of NPP Bohunice complex. Two type of radiation risk scenarios, namely the bank use and contaminated soil (from bank) use scenario were investigated in relation to decision making on the planning for restoration of the contaminated banks. Results of dose assessments and the approach to planning for restoration of contaminated banks are summarized in the paper. Some details from the worked out technical design of the contaminated soil removal from the banks and its safe disposal in a near surface isolated basin are introduced in the paper too

  10. What will we do with 104,000,000 cubic feet of Fernald waste?

    International Nuclear Information System (INIS)

    Motl, G.P.; Krieger, G.J.

    1995-01-01

    The Fernald Site, a Department of Energy (DOE) uranium metal production facility that ceased production in 1989, is now being remediated by the DOE under terms of a Consent Agreement with the United States Environmental Protection Agency (USEPA) and a Consent Decree with the State of Ohio. It is estimated that the cleanup will generate 104,000,000 cubic feet of low-level radioactive waste including construction debris, pit sludge, radium residue and a huge volume of uranium contaminated soil. The waste handling strategy for this huge volume of waste includes minimizing remedial waste generation, recycling material when economically feasible, free-releasing clean material and volume reduction. It is anticipated that large scale radium residue vitrification and sludge drying equipment/facilities will be constructed onsite for waste treatment prior to off-site disposal. Fernald waste disposition will include both onsite disposal (if approved under CERCLA) and off-site disposal at both commercial and DOE waste disposal facilities. The waste disposition strategy selected reflects a diverse variety of technical, political, regulatory and economic factors. This presentation will describe the current views at Fernald on open-quotes what will we do with 104,000,000 cubic feet of Fernald waste.close quotes

  11. The highly successful safe remediation of the Fernald waste pits undertaken under the privatization model

    Energy Technology Data Exchange (ETDEWEB)

    Cherry, Mark; Lojek, Dave; Murphy, Con

    2003-02-23

    Remediation of eight waste pits at the Department of Energy (DOE) Fernald site, located northwest of Cincinnati, Ohio, involves excavating approximately one million tonnes in-situ of low-level waste which were placed in pits during Fernald's production era. This unique project, one of the largest in the history of CERCLA/Superfund, includes uranium and thorium contaminated waste, soils and sludges. These wet soils and sludges are thermally dried in a processing facility to meet Department of Transportation (DOT) transportation and disposal facility waste acceptance criteria, loaded into railcars and shipped to the Envirocare waste disposal facility at Clive, Utah. This project is now approximately 60% complete with more than 415,000 tonnes (460,000 tons) of waste material safely shipped in 74 unit trains to Envirocare. Work is scheduled to be completed in early 2005. Success to date demonstrates that a major DOE site remediation project can be safely and successfully executed in partnership with private industry, utilizing proven commercial best practices, existing site labor resources and support of local stakeholders. In 1997 under the DOE's privatization initiative, Fluor Fernald, Inc. (Fluor Fernald) solicited the services of the remediation industry to design, engineer, procure, construct, own and operate a facility that would undertake the remediation of the waste pits. The resulting procurement was awarded to IT Corporation, currently Shaw Environmental and Infrastructure, Inc. (Shaw). The contractor was required to finance the procurement and construction of its facilities and infrastructure. The contract was performance-based and payment would be made on the successful loadout of the waste from the facility on a per-ton basis meeting the Envirocare waste acceptance criteria. This paper details the performance to date, the challenges encountered, and the seamless partnering between DOE, the Environmental Protection Agency (EPA), Fluor Fernald

  12. Environment, Environmental Restoration, and Waste Management Field Organization Directory

    International Nuclear Information System (INIS)

    1993-07-01

    This directory was developed by the Office of Environmental Guidance, RCRA/CERCLA Division (EH-231) from an outgrowth of the Departments efforts to identify and establish the regulatory response lead persons in the Field Organizations. The directory was developed for intemal EH-231 use to identify both the DOE and DOE contractor Field Organizations in the Environment, Environmental Restoration and Waste Management areas. The Field Organization directory is divided into three substantive sections: (1) Environment; (2) Environmental Restoration; and (3) Waste Management which are organized to correspond to the management hierarchy at each Field Organization. The information provided includes the facility name and address, individual managers name, and telephone/fax numbers

  13. Environment, Environmental Restoration, and Waste Management Field Organization Directory

    Energy Technology Data Exchange (ETDEWEB)

    1993-07-01

    This directory was developed by the Office of Environmental Guidance, RCRA/CERCLA Division (EH-231) from an outgrowth of the Departments efforts to identify and establish the regulatory response lead persons in the Field Organizations. The directory was developed for intemal EH-231 use to identify both the DOE and DOE contractor Field Organizations in the Environment, Environmental Restoration and Waste Management areas. The Field Organization directory is divided into three substantive sections: (1) Environment; (2) Environmental Restoration; and (3) Waste Management which are organized to correspond to the management hierarchy at each Field Organization. The information provided includes the facility name and address, individual managers name, and telephone/fax numbers.

  14. Benefits of On-Site Management of Environmental Restoration Wastes

    Energy Technology Data Exchange (ETDEWEB)

    Irwin, Michael J. ,P.E.; Wood, Craig, R.E.M.; Kwiecinski, Daniel, P.E.; Alanis, Saul

    2003-02-27

    As Sandia National Laboratories/New Mexico (SNL/NM) began assessing options under which to conduct the remediation of environmental restoration sites, it became clear that the standard routes for permanent disposal of waste contaminated with hazardous materials would be difficult. Publicly, local citizens' groups resisted the idea of large volumes of hazardous waste being transported through their communities. Regulations for the off-site disposal are complicated due to the nature of the environmental restoration waste, which included elevated tritium levels. Waste generated from environmental restoration at SNL/NM included debris and soils contaminated with a variety of constituents. Operationally, disposal of environmental restoration waste was difficult because of the everchanging types of waste generated during site remediation. As an alternative to standard hazardous waste disposal, SNL/NM proposed and received regulatory approval to construct a Corrective Action Management Unit (CAMU). By containing the remediation wastes on-site, SNL/NM's Environmental Restoration (ER) Program managed to eliminate transportation concerns from the public, worked with regulatory agencies to develop a safe, permanent disposal, and modified the waste disposal procedures to accommodate operational changes. SNL/NM accomplished the task and saved approximately $200 million over the life of the CAMU project, as compared to off-site disposal options.

  15. The summary of national environmental restoration needs

    International Nuclear Information System (INIS)

    1993-07-01

    The Office of Technology Development of the US Department of Energy (DOE) has directed the Savannah River Technology Center to implement an Integrated Demonstration Program at Savannah River Site to assess new environmental remediation systems and technologies and transfer them to other DOE sites and private industry for use in full-scale remediation efforts. The first phase of the Integrated Demonstration Program is coming to a successful conclusion and the Savannah River Technology Center has asked a panel of environmental experts to prioritize national, DOE, and Savannah River Site environmental problems and make programmatic recommendations for future technology research and demonstrations. This document is a summary of national and DOE environmental problems that are common to Savannah River Site and was created as a decision making tool for the expert panel. There are many diverse environmental problems, therefore the summary has been limited to environmental problems that are significant to the Savannah River Site. National environmental problems identified in the summary are soil and water contaminated with organic compounds. Specifically, groundwater contaminated with dense non-aqueous phase liquid hydrocarbons was found to be a significant national environmental problem. The DOE environmental problems identified in the summary are soil and water contaminated with fuel and chlorinated hydrocarbon compounds, metal compounds, and radioactive elements. Savannah River Site environmental problems identified in the summary are soil and groundwater contaminated with chlorinated hydrocarbons, metal compounds, tritiated water, and other radioactive elements. Technology deficiencies that were identified in the summary were deficiencies in in situ remediation technologies, in situ characterization technologies, and in situ isolation and containment technologies

  16. Environmental Restoration Strategic Plan. Remediating the nuclear weapons complex

    International Nuclear Information System (INIS)

    1995-08-01

    With the end of the cold war, the US has a reduced need for nuclear weapons production. In response, the Department of Energy has redirected resources from weapons production to weapons dismantlement and environmental remediation. To this end, in November 1989, the US Department of Energy (DOE) established the Office of Environmental Restoration and Waste Management (renamed the Office of Environmental Management in 1994). It was created to bring under a central authority the management of radioactive and hazardous wastes at DOE sites and inactive or shut down facilities. The Environmental Restoration Program, a major component of DOE's Environmental Management Program, is responsible for the remediation and management of contaminated environmental media (e.g., soil, groundwater, sediments) and the decommissioning of facilities and structures at 130 sites in over 30 states and territories

  17. Quality Assurance Program Plan for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    1992-01-01

    The United States Department of Energy (USDOE) has initiated the Environmental Restoration Program (ERP) in an effort to manage, control and remediate existing hazardous, toxic and radioactive wastes generated at the Portsmouth Gaseous Diffusion Plant (PORTS). This ERP Quality Assurance Program Plan (QAPP) is responsive to the PORTS ESH Division QAPP and the ES Environmental Restoration Division (ERD) QAPP. This QAPP establishes the policies, requirements and responsibilities by which an appropriate level of QA shall be implemented within the PORTS-ERP. All PORTS-ERP activities shall be conducted in accordance with the requirements of this document and/or of a project level document which is derivative of this document

  18. Statistical analysis of real-time, enviromental radon monitoring results at the Fernald Enviromental Management Project

    International Nuclear Information System (INIS)

    Liu, Ning; Spitz, H.B.; Tomezak, L.

    1996-01-01

    A comprehensive real-time, environmental radon monitoring program is being conducted at the Fernald Environmental Management Project, where a large quantity of radium-bearing residues have been stored in two covered earth-bermed silos. Statistical analyses was conducted to determine what impact radon emitted by the radium bearing materials contained in the silos has on the ambient radon concentration at the Fernald Environmental Management Project site. The distribution that best describes the outdoor radon monitoring data was determined before statistical analyses were conducted. Random effects associated with the selection of radon monitoring locations were accommodated by using nested and nested factorial classification models. The Project site was divided into four general areas according to their characteristics and functions: (1) the silo area, where the radium-bearing waste is stored; (2) the production/administration area; (3) the perimeter area, or fence-line, of the Fernald Environmental Management Project site; and (4) a background area, located approximately 13 km from the Fernald Environmental Management Project site, representing the naturally-occurring radon concentration. A total of 15 continuous, hourly readout radon monitors were installed to measure the outdoor radon concentration. Measurement results from each individual monitor were found to be log-normally distributed. A series of contrast tests, which take random effects into account, were performed to compare the radon concentration between different areas of the site. These comparisons demonstrate that the radon concentrations in the production/administration area and the perimeter area are statistically equal to the natural background, whereas the silo area is significantly higher than background. The study also showed that the radon concentration in the silo area was significantly reduced after a sealant barrier was applied to the contents of the silos. 10 refs., 6 figs., 8 tabs

  19. Processing of uranyl nitrate hexahydrate (UNH) at DOE's Fernald Site: Success and pitfalls

    International Nuclear Information System (INIS)

    Luken, D.W.; Brettschneider, D.J.; Heck, R.P. III; White, C.A.

    1996-01-01

    After 36 years of operation, uranium production at the Department of Energy Fernald Environmental Management Project (FEMP) was halted in 1989. Uranyl Nitrate Hexahydrate (UNH) had been produced during the uranium refining. In June 1991, DOE determined the UNH to be a mixed hazardous waste under the Resource Conservation and Recovery Act. A UNH Neutralization Project began processing UNH stored in stainless steel tanks located in various areas within the Fernald Plant 2/3 Complex. It was discovered that the valves, flanges, and other fittings of the UNH storage tanks were leaking. This made processing the UNH a high priority and Comprehensive, Environmental, Response, Compensation, and Liability Act Removal Action No. 20, Stabilization of UNH Inventories, was initiated. This report presents the successes and pitfalls of the cleanup of UNH

  20. Packaging development needs to support environmental restoration

    International Nuclear Information System (INIS)

    Hummer, J.H.; Kuklinski, J.L.

    1993-01-01

    The U.S. Department of Energy is bringing its facilities into compliance with present environmental protection regulations. At the Hanford Site, this includes cleanup of its vast nuclear and chemical wastes. Cleanup will involve extensive collecting, consolidating, and processing of radioactive and other hazardous wastes. The Hanford Site was established by the Federal government in 1943 to produce plutonium. Natural uranium was fabricated into fuel slugs, inserted into nuclear reactors, and converted into plutonium. The irradiated slugs were then sent through plutonium extraction facilities. Process waste was discharged to the ground, stored on-site, or shipped off-site for disposal. Activities grew to include nine production reactors, five coal-fired power plants, nuclear fuel fabrication, other support facilities including underground waste storage tanks, and numerous chemical and waste processing plants. Cleanup activities will require extensive transport of radioactive and other hazardous materials. Packaging developments and research are required in the following areas to enhance environmental cleanup; (1) Packaging for Large Contaminated and Activated Components. (2) Bulk Packaging for Contaminated Solids. (3) Bulk Packaging for Contaminated Liquids. (4) Environmental Samples. (J.P.N.)

  1. Fernald - Developing and Executing an Accelerated Closure Plan

    International Nuclear Information System (INIS)

    Nixon, D.A.

    2006-01-01

    In November 2000 the Department of Energy (DOE) and Fluor Fernald entered into a closure contract that incited Fluor Fernald to reduce the cost and schedule of the Fernald site cleanup. The contract established a target schedule and target cost and how Fluor Fernald performs against these targets determines the amount of fee the company earns. In response to these new challenges, Fluor Fernald developed a 13-part strategy to safely accelerate work and more efficiently utilize the available funding. Implementation of this strategy required a dramatic culture change at Fernald - from a 'government job mind set' to an entrepreneurial/commercial model. Fluor Fernald's strategy and culture change has proved to be successful as the company is on track to close the site ahead of the target schedule at a total project cost less than the target cost. The elements of Fluor Fernald's strategy and the lessons learned during implementation provide valuable information that could be utilized by other DOE sites that will be undergoing closure over the next decade. (authors)

  2. Strategic plan for Hanford Site Environmental Restoration Information Management

    International Nuclear Information System (INIS)

    Cowley, P.J.; Beck, J.E.; Gephart, R.E.

    1994-06-01

    This strategic plan addresses information management for the Environmental Restoration (ER) Program at the Hanford Site. This Program leads the cleanup of the Hanford Site's soil, groundwater, buried waste, and the decontamination and decommissioning of facilities. The vision that drives this strategic plan is to ensure that quality information is available to the people who need it, when they need it, at a convenient location, in a usable form, and at an acceptable cost. Although investments are being made in managing the vast amounts of information, which include data, records and documents associated with the Hanford Site's production history and new cleanup mission, it is widely recognized that efforts to date have not accomplished the vision. Effective information management involves more than the compilation of massive amounts of electronic and non-electronic information. It also involves integrating information management into business processes that support user's needs and decisionmaking. Only then can information management complement and enable environmental restoration priorities and practices, help identify environmental restoration requirements, and enable communication within the Environmental Restoration Program and between the Program and its stakeholders. Successfully accomplishing the Hanford Site mission requires an integrated approach to information management that crosses organizational boundaries, streamlines existing systems, and builds new systems that support the needs of the future. This plan outlines that approach

  3. Strategic plan for Hanford Site Environmental Restoration Information Management

    Energy Technology Data Exchange (ETDEWEB)

    Cowley, P.J.; Beck, J.E.; Gephart, R.E. [and others

    1994-06-01

    This strategic plan addresses information management for the Environmental Restoration (ER) Program at the Hanford Site. This Program leads the cleanup of the Hanford Site`s soil, groundwater, buried waste, and the decontamination and decommissioning of facilities. The vision that drives this strategic plan is to ensure that quality information is available to the people who need it, when they need it, at a convenient location, in a usable form, and at an acceptable cost. Although investments are being made in managing the vast amounts of information, which include data, records and documents associated with the Hanford Site`s production history and new cleanup mission, it is widely recognized that efforts to date have not accomplished the vision. Effective information management involves more than the compilation of massive amounts of electronic and non-electronic information. It also involves integrating information management into business processes that support user`s needs and decisionmaking. Only then can information management complement and enable environmental restoration priorities and practices, help identify environmental restoration requirements, and enable communication within the Environmental Restoration Program and between the Program and its stakeholders. Successfully accomplishing the Hanford Site mission requires an integrated approach to information management that crosses organizational boundaries, streamlines existing systems, and builds new systems that support the needs of the future. This plan outlines that approach.

  4. Decommissioning and environmental restoration of nuclear facilities in China

    International Nuclear Information System (INIS)

    Pan Ziqiang

    2000-01-01

    In the beginning of the 1980s, the Scientific and Technological Commission (STC) began the study on the environmental impact of the nuclear industry in China. At the end of the 1980s, the STC initiated the study on the decommissioning of nuclear facilities and environmental restoration. In 1989 the STC completed the project entitled ''Radiological and Environmental Quality Assessment of the Nuclear Industry in China Over the Past Thirty Years''. The status of the environmental pollution of various nuclear facility sites was subsequently analysed. In 1994, the decommissioning and environmental restoration of the first research and manufacture complex for nuclear weapons was completed. The complex is now accessible to the public without restriction and the site has become a town. Some nuclear related facilities, such as uranium mines, are currently being decommissioned. Although uranium mining and milling has a more serious impact on the environment, the technology for decommissioning and environmental restoration in mining and milling installations is not much more complicated than that used for reactor and reprocessing facilities: much has been achieved in the area of mining and milling. (author)

  5. Revegetation manual for the environmental restoration contractor

    International Nuclear Information System (INIS)

    McLendon, T.; Redente, E.F.

    1997-02-01

    The purpose of this manual is to provide guidance and general guidelines for the revegetation of remediation waste sites and other disturbed areas on the Hanford Site. Specific revegetation plans will be developed using guidance from this manual. Locations, resources, and funding will dictate the specific revegetation design at each disturbed area. Disturbances have occurred to some of the ecological communities of the Hanford Site. Many of these disturbances are the result of operations of the Hanford Site, including Comprehensive Environmental Response, Compensation, and Liability Act of 1980 waste sites on small portions of the Hanford Site. There were, however, extensive disturbances to the native vegetation prior to operations of the facility. These resulted from cultivation, grazing, fire, and the introduction of exotics. Revegetation planning must take into account these early disturbances, as well as the later ones

  6. Revegetation manual for the environmental restoration contractor

    Energy Technology Data Exchange (ETDEWEB)

    McLendon, T.; Redente, E.F.

    1997-02-01

    The purpose of this manual is to provide guidance and general guidelines for the revegetation of remediation waste sites and other disturbed areas on the Hanford Site. Specific revegetation plans will be developed using guidance from this manual. Locations, resources, and funding will dictate the specific revegetation design at each disturbed area. Disturbances have occurred to some of the ecological communities of the Hanford Site. Many of these disturbances are the result of operations of the Hanford Site, including Comprehensive Environmental Response, Compensation, and Liability Act of 1980 waste sites on small portions of the Hanford Site. There were, however, extensive disturbances to the native vegetation prior to operations of the facility. These resulted from cultivation, grazing, fire, and the introduction of exotics. Revegetation planning must take into account these early disturbances, as well as the later ones.

  7. Educational initiatives in environmental restoration and waste management

    International Nuclear Information System (INIS)

    Prestwich, S.M.

    1990-01-01

    Policy-makers responding to the urgency of the demands for a clean environment are finding that America lacks the technical know-how and the pool of technicians, scientists, and engineers to meet the environmental challenges. In response to the need for a technically skilled work force, government agencies and the private sector have worked to assess the probable effect of shortages and have sought ways to prevent the problem. The US Department of Energy (DOE) and its predecessor agencies have historically supported strong linkages between the academic community - the providers of scientists and engineers - and the department - the users of those workers - to assure an adequate supply of appropriately educated technicians, scientists, and engineers to conduct basic and applied research in support of the DOE's mission and to implement that mission. One of the department's challenges is the minimization, management, and cleanup of waste materials generated from departmental operations. The recently published Environmental Restoration and Waste Management Five-Year Plan for fiscal years 1992 through 1996 reaffirms DOE's policy of compliance with environmental laws and regulations. It also maps out the newly created Office of Environmental Restoration and Waste Management's aggressive programs to improve training and education, to arouse interest in pursuit of science/engineering careers, and to place special emphasis on recruiting minorities and women to technical fields vital to the environmental restoration/waste management mission

  8. Richland Environmental Restoration Project management action process document

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites.

  9. Richland Environmental Restoration Project management action process document

    International Nuclear Information System (INIS)

    1996-04-01

    A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites

  10. Environmental Restoration and Waste Management (EM) program: An introduction

    International Nuclear Information System (INIS)

    1990-12-01

    This booklet introduces the reader to the mission and functions of a major new unit within the US Department of Energy (DOE): the Office of Environmental Restoration and Waste Management (EM). The Secretary of Energy established EM in November 1989, implementing a central purpose of DOE's first annual Environmental Restoration and Waste Management Five-Year Plan, which had appeared three months earlier. The contents of this booklet, and their arrangement, reflect the annual update of the Five-Year Plan. The Five-Year Plan supports DOE's strategy for meeting its 30-year compliance and cleanup goal. This strategy involves: focusing DOE's activities on eliminating or reducing known or recognized potential risks to worker and public health and the environment, containing or isolating, removing, or detoxifying onsite and offsite contamination, and developing technology to achieve DOE's environmental goals

  11. Environmental Restoration and Waste Management (EM) program: An introduction

    International Nuclear Information System (INIS)

    1991-06-01

    This booklet introduces the reader to the mission and functions of a major unit within the US Department of Energy (DOE): the Office of Environmental Restoration and Waste Management (EM). The Secretary of Energy established EM in November 198, implementing the first step in fulfilling the central purpose of DOE's annually updated Environmental Restoration and Waste Management Five-Year Plan (FYP). The first FYP had been developed three months earlier. The contents of this booklet, and their arrangement, reflect (and will, it is hoped, serve as a kind of appetizer for) the annual update of the Five-Year Plan. The Five-Year Plan supports DOE's strategy for meeting its 30-year compliance and cleanup goal. This strategy involves: (1) focusing DOE's activities on eliminating or reducing known or recognized potential risks to workers, the public, and the environment; (2) containing or isolating, removing, or detoxifying onsite and offsite contamination; and (3) developing technology to achieve DOE's environmental goals. 101 refs

  12. Environmental restoration using plant-microbe bioaugmentation

    International Nuclear Information System (INIS)

    Kingsley, M.T.; Fredrickson, J.K.; Metting, F.B.; Seidler, R.J.

    1993-04-01

    Land farming, for the purpose of bioremediation, refers traditionally to the spreading of contaminated soil, sediments, or other material over land; mechanically mixing it; incorporating various amendments, such as fertilizer or mulch; and sometimes inoculating with degradative microorganisms. Populations of bacteria added to soils often decline rapidly and become metabolically inactive. To efficiently degrade contaminants, microorganisms must be metabolically active. Thus, a significant obstacle to the successful use of microorganisms for environmental applications is their long-term survival and the expression of their degradative genes in situ. Rhizosphere microorganisms are known to be more metabolically active than those in bulk soil, because they obtain carbon and energy from root exudates and decaying root matter. Rhizosphere populations are also more abundant, often containing 10 8 or more culturable bacteria per gram of soil, and bacterial populations on the rhizoplane can exceed 10 9 /g root. Many of the critical parameters that influence the competitive ability of rhizosphere bacteria have not been identified, but microorganisms have frequently been introduced into soil (bioaugmentation) as part of routine or novel agronomic practices. However, the use of rhizosphere bacteria and their in situ stimulation by plant roots for degrading organic contaminants has received little attention. Published studies have demonstrated the feasibility of using rhizobacteria (Pseudomonas putida) for the rapid removal of chlorinated pesticides from contaminated soil, and to promote germination of radish seeds in the presence of otherwise phytotoxic levels of the herbicide 2,4-dichlorophenoxyacetic acid (2,4-D), and phenoxyacetic acid (PAA). The present investigation was undertaken to determine if these strains (Pseudomonas putida PPO301/pRO101 and PPO301/pRO103) could be used to bioremediate 2,4-D-amended soil via plant-microbe bioaugmentation

  13. Rail transportation of Fernald remediation waste

    International Nuclear Information System (INIS)

    Fellman, R.T.; Lojek, D.A.; Motl, G.P.; Weddendorf, W.K.

    1995-01-01

    Remediation of the Department of Energy (DOE) Fernald site located north of Cincinnati will generate large quantities of low-level radwaste. This volume includes approximately 1,050,000 tons of material to be removed from eight waste pits comprising Operable Unit 1 (OU-1). The remedial alternative selected includes waste material excavation, drying and transportation by rail to a burial site in the arid west for disposal. Rail transportation was selected not only because rail transportation is safer than truck transportation, but also because of the sheer magnitude of the project and the availability of bulk rail car unloading facilities at a representative disposal site. Based upon current waste quantity estimates as presented in the Feasibility Study for OUI, a fully-loaded 47-car unit train would depart the Fernald site weekly for five years. This paper illustrates the steps taken to obtain agency and public acceptance of the Record of Decision for the remedy which hinged on rail transportation. A preliminary, but detailed, rail transportation plan was prepared for the project to support a series of CERCLA public meetings conducted in late 1994. Some of the major issues addressed in the plan included the following: (1) Scope of project leading to selection of rail transportation; (2) Waste classification; (3) Rail Company overview; (4) Train configuration and rail car selection; (5) Routing; (6) Safety; (7) Prior Notification Requirements (8) Emergency Response. A series of three public meetings identified a number of issues of prime concern to Fernald stakeholders. Following resolution of these issues during the public comment period, a Record of Decision (ROD) approving implementation of the rail transportation strategy was approved pending incorporation of EPA and State of Ohio comments on December 22, 1994

  14. Vitrification pilot plant experiences at Fernald, Ohio

    International Nuclear Information System (INIS)

    Akgunduz, N.; Gimpel, R.F.; Paine, D.; Pierce, V.H.

    1997-01-01

    A one metric ton/day Vitrification Pilot Plant (VITPP) at Fernald, Ohio, simulated the vitrification of radium and radon bearing silo residues using representative non-radioactive surrogates containing high concentrations of lead, sulfates, and phosphates. The vitrification process was carried out at temperatures of 1,150 to 1,350 C. The VITPP processed glass for seven months, until a breach of the melter containment vessel suspended operations. More than 70,000 pounds of surrogate glass were produced by the VITPP. Experiences, lessons learned, and path forward will be presented

  15. Origin and evolution of the Office of Environmental Restoration and Waste Management programmatic environmental impact statement

    International Nuclear Information System (INIS)

    Strider, P.; Huizenga, D.

    1993-01-01

    Prior to November 1989, the diverse environmental restoration and waste management activities of the U.S. Department of Energy (DOE) were the responsibility of the various line organizations, which had the primary missions of weapons production, research, and related departmental activities. At that time, Secretary of Energy Admiral James Watkins saw the need to establish the Office of Environmental Restoration and Waste Management (EM), which consolidated those activities under a single management structure

  16. Tiger team findings related to DOE environmental restoration activities

    International Nuclear Information System (INIS)

    Levitan, W.M.

    1991-01-01

    Tiger Team Assessments were implemented in June 1989 as part of a strategy to ensure that DOE facilities fully comply with Federal, state, local and DOE environment, safety, and health (ES ampersand H) requirements. The Tiger Teams provide the Secretary of Energy with information on current ES ampersand H compliance status of each DOE facility and causes for noncompliance. To date, Tiger Team Assessments have been completed at 25 DOE facilities. With regard to assessments of environmental restoration activities, the performance of DOE facilities was evaluated against the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, the National Contingency Plan (NCP), and DOE Order 5400.4, CERCLA Requirements, among others. Five major categories of environmental restoration-related findings were identified: (1) environmental restoration program planning and management (found at 60 percent of the sites assessed); (2) community relations/administrative record (60 percent); (3) characterization of extent of contamination (56 percent); (4) identification and evaluation of inactive waste sites (56 percent); and (5) DOE and NCP requirements for response action studies (44 percent). Primary causal factors for these findings were inadequate procedures, resources, supervision, and policy implementation

  17. Community Relations Plan for Lawrence Berkeley Laboratory. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-07-01

    The Lawrence Berkeley Laboratory (LBL) has applied to the California Environmental Protection Agency, Department of Toxic Substances Control (DTSC), for renewal of its Hazardous Waste Handling Facility Permit. A permit is required under Resource Conservation and Recovery Act (RCRA) regulations. The permit will allow LBL to continue using its current hazardous waste handling facility, upgrade the existing facility, and construct a replacement facility. The new facility is scheduled for completion in 1995. The existing facility will be closed under RCRA guidelines by 1996. As part of the permitting process, LBL is required to investigate areas of soil and groundwater contamination at its main site in the Berkeley Hills. The investigations are being conducted by LBL`s Environmental Restoration Program and are overseen by a number of regulatory agencies. The regulatory agencies working with LBL include the California Environmental Protection Agency`s Department of Toxic Substances Control, the California Regional Water Quality Control Board, the Bay Area Air Quality Management District, the East Bay Municipal Utilities District, and the Berkeley Department of Environmental Health. RCRA requires that the public be informed of LBL`s investigations and site cleanup, and that opportunities be available for the public to participate in making decisions about how LBL will address contamination issues. LBL has prepared this Community Relations Plan (CRP) to describe activities that LBL will use to keep the community informed of environmental restoration progress and to provide for an open dialogue with the public on issues of importance. The CRP documents the community`s current concerns about LBL`s Environmental Restoration Program. Interviews conducted between February and April 1993 with elected officials, agency staff, environmental organizations, businesses, site neighbors, and LBL employees form the basis for the information contained in this document.

  18. CERCLA integration with site operations the Fernald experience

    International Nuclear Information System (INIS)

    Coyle, S.W.; Shirley, R.S.; Varchol, B.D.

    1991-01-01

    A major transition in the Fernald Environmental Management Project (FEMP) site mission has occurred over the past few years. The production capabilities formally provided by the FEMP are being transferred to private industry through a vendor qualification program. Environmental compliance and site cleanup are now the primary focus. In line with this program, the production of uranium products at the site was suspended in July 1989 in order to concentrate resources on the environmental mission. Formal termination of the FEMP production mission was accomplished on June 19, 1991. Environmental issues such as stored inventories of process residues materials and equipment are being addressed under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). The diversity of these hazards complicates the strategic planning for an integrated site cleanup program. This paper will discuss the programmatic approach which is being implemented to ensure activities such as waste management, site utility and support services, health and safety programs, and Resource Conservation and Recovery Act (RCRA) programs are being integrated with CERCLA. 6 figs., 3 tabs

  19. Assessment and evaluation of technologies for environmental restoration. Progress report

    Energy Technology Data Exchange (ETDEWEB)

    Uzochukwu, G. A. [North Carolina A and T State Univ., Greensboro, NC (United States)

    2000-06-30

    Nuclear and commercial non-nuclear technologies that have the potential of meeting the environmental restoration objectives of the Department of Energy are being evaluated. A detailed comparison of innovative technologies available will be performed to determine the safest and most economical technology for meeting these objectives. Information derived from this effort will be matched with the multi-objective of the environmental restoration effort to ensure that the best, most economical, and the safest technologies are used in decision making at USDOE-SRS. Technology-related variables will be developed and the resulting data formatted and computerized for multimedia systems. The multimedia system will be made available to technology developers and evaluators to ensure that the safest and most economical technologies are developed for use at SRS and other DOE sites.

  20. University of Tennessee and Oak Ridge environmental restoration education program

    International Nuclear Information System (INIS)

    Yalcintas, M.G.; Swindle, D.W. Jr.

    1992-01-01

    A joint program of the Oak Ridge National Laboratory (ORNL) and the University of Tennessee at Knoxville (UTK) has been initiated to provide education and research on environmental restoration and waste management. The program will provide opportunity for formal education and research for area businesses, while integrating their efforts in mixed-waste management with those of UTK and ORNL. Following successful results demonstrated at ORNL and UTK, the program will be integrated with other universities and research institutions in the country. During this presentation, the programs's objective, scope, and goals will be described, and details of the program structure will be explained. Also, it will be demonstrated how experience gained in environmental restoration technology transfer activities could be applied in an educational program, providing a focal point for technology transfer and information exchange. Expected accomplishments and industry benefits will also be discussed

  1. Assessment and evaluation of technologies for environmental restoration. Progress report

    International Nuclear Information System (INIS)

    Uzochukwu, G. A.

    2000-01-01

    Nuclear and commercial non-nuclear technologies that have the potential of meeting the environmental restoration objectives of the Department of Energy are being evaluated. A detailed comparison of innovative technologies available will be performed to determine the safest and most economical technology for meeting these objectives. Information derived from this effort will be matched with the multi-objective of the environmental restoration effort to ensure that the best, most economical, and the safest technologies are used in decision making at USDOE-SRS. Technology-related variables will be developed and the resulting data formatted and computerized for multimedia systems. The multimedia system will be made available to technology developers and evaluators to ensure that the safest and most economical technologies are developed for use at SRS and other DOE sites.

  2. U.S. Department of Energy's environmental restoration recycling program

    International Nuclear Information System (INIS)

    Warren, S.; Buller, J.

    1995-01-01

    The US Department of Energy (DOE) is contemplating establishing a recycling policy for environmental restoration efforts across the complex. The proposed Recycle 2000 policy now under consideration calls for recycling radioactively contaminated scrap metal generated by environmental restoration activities into containers for disposing of wastes within the DOE complex. Policy development within DOE typically has involved the Department's stakeholders only at the implementation phase. In this case, DOE decided to involve stakeholders at the outset of policy development. By considering stakeholders' perspectives in the framing of the policy, DOE anticipates that implementation of the resulting policy is likely to meet with greater success. This paper describes the Recycle 2000 policy, DOE's approach to developing it, and the status of development

  3. Assessment and evaluation of technologies for environmental restoration. Progress report

    International Nuclear Information System (INIS)

    Uzochukwu, G.A.

    1999-01-01

    Nuclear and commercial non-nuclear technologies that have the potential of meeting the environmental restoration objectives of the Department of Energy are being evaluated. A detailed comparison of innovative technologies available will be performed to determine the safest and most economical technology for meeting these objectives. Information derived from this effort will be matched with the multi-objective of the environmental restoration effort to ensure that the best, most economical, and the safest technologies are used in decision making at USDOE-SRS. Technology-related variables will be developed and the resulting data formatted and computerized for multimedia systems. The multimedia system will be made available to technology developers and evaluators to ensure that the safest and most economical technologies are developed for use at SRS and other DOE sites

  4. Assessment and evaluation of technologies for environmental restoration. Progress report

    Energy Technology Data Exchange (ETDEWEB)

    Uzochukwu, G.A.

    1999-01-15

    Nuclear and commercial non-nuclear technologies that have the potential of meeting the environmental restoration objectives of the Department of Energy are being evaluated. A detailed comparison of innovative technologies available will be performed to determine the safest and most economical technology for meeting these objectives. Information derived from this effort will be matched with the multi-objective of the environmental restoration effort to ensure that the best, most economical, and the safest technologies are used in decision making at USDOE-SRS. Technology-related variables will be developed and the resulting data formatted and computerized for multimedia systems. The multimedia system will be made available to technology developers and evaluators to ensure that the safest and most economical technologies are developed for use at SRS and other DOE sites.

  5. Environmental restoration plans and activities in the Russian Federation

    International Nuclear Information System (INIS)

    Boldyrev, V.; Komarov, A.; Kuzin, R.; Shatalov, V.

    1997-01-01

    The report deals with the status of environmental restoration of uranium-contaminated sites and the methods to reduce radionuclides concentration in the solid and liquid wastes as well as their utilization potential. Attention is given to the waste utilization in agriculture and civil engineering construction. With this in view, the paper deals with waste water purification and applicable standards for natural radionuclides content in solid waste for utilization in construction activities. All works are carried out in accordance with the Special Complex Programme for environmental restoration of contaminated uranium mining and milling sites caused by the activities of the industries engaged in nuclear materials production for the Ministry of Atomic Energy of the Russian Federation. The Programme is an integral part of the Federal Programme ''Conversion of Russian Defense Industries in 1993-2000''. (author)

  6. Savannah River Site environmental restoration lessons learned program

    International Nuclear Information System (INIS)

    Plunkett, R.A.; Leibfarth, E.C.; Treger, T.M.; Blackmon, A.M.

    1993-01-01

    For the past three years environmental restoration has been formally consolidated at Savannah River Site. Accomplishments include waste site investigations to closure activities. Positive, as well as negatively impacting, events have occurred. Until recently, lessons learned were captured on a less than formal basis. Now, a program based upon critiques, evaluations and corrective actions is being used. This presentation reviews the development, implementation and use of that program

  7. Technology integration project: Environmental Restoration Technologies Department Sandia National Laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Williams, C.V.; Burford, T.D. [Sandia National Labs., Albuquerque, NM (United States). Environmental Restoration Technologies; Allen, C.A. [Tech Reps, Inc., Albuquerque, NM (United States)

    1996-08-01

    Sandia National Laboratories Environmental Restoration Technologies Department is developing environmental restoration technologies through funding form the US Department of Energy`s (DOE`s) Office of Science and Technology. Initially, this technology development has been through the Mixed Waste Landfill Integrated Demonstration (MWLID). It is currently being developed through the Contaminant Plume containment and Remediation Focus Area, the Landfill Stabilization Focus Area, and the Characterization, Monitoring, and Sensor Cross-Cutting Program. This Technology Integration Project (TIP) was responsible for transferring MWLID-developed technologies for routine use by environmental restoration groups throughout the DOE complex and commercializing these technologies to the private sector. The MWLID`s technology transfer/commercialization successes were achieved by involving private industry in development, demonstration, and technology transfer/commercialization activities; gathering and disseminating information about MWLID activities and technologies; and promoting stakeholder and regulatory involvement. From FY91 through FY95, 30 Technical Task Plans (TTPs) were funded. From these TTPs, the MWLID can claim 15 technology transfer/commercialization successes. Another seven technology transfer/commercialization successes are expected. With the changeover to the focus areas, the TIP continued the technology transfer/commercialization efforts begun under the MWLID.

  8. Technology integration project: Environmental Restoration Technologies Department Sandia National Laboratories

    International Nuclear Information System (INIS)

    Williams, C.V.; Burford, T.D.

    1996-08-01

    Sandia National Laboratories Environmental Restoration Technologies Department is developing environmental restoration technologies through funding form the US Department of Energy's (DOE's) Office of Science and Technology. Initially, this technology development has been through the Mixed Waste Landfill Integrated Demonstration (MWLID). It is currently being developed through the Contaminant Plume containment and Remediation Focus Area, the Landfill Stabilization Focus Area, and the Characterization, Monitoring, and Sensor Cross-Cutting Program. This Technology Integration Project (TIP) was responsible for transferring MWLID-developed technologies for routine use by environmental restoration groups throughout the DOE complex and commercializing these technologies to the private sector. The MWLID's technology transfer/commercialization successes were achieved by involving private industry in development, demonstration, and technology transfer/commercialization activities; gathering and disseminating information about MWLID activities and technologies; and promoting stakeholder and regulatory involvement. From FY91 through FY95, 30 Technical Task Plans (TTPs) were funded. From these TTPs, the MWLID can claim 15 technology transfer/commercialization successes. Another seven technology transfer/commercialization successes are expected. With the changeover to the focus areas, the TIP continued the technology transfer/commercialization efforts begun under the MWLID

  9. Opportunities for health and safety professionals in environmental restoration work

    International Nuclear Information System (INIS)

    Norris, A.E.

    1991-01-01

    The safety of workers in waste management and in environmental restoration work is regulated in large part by the Occupational Safety and Health Administration (OSHA). Many of the OSHA rules are given in Part 1910, Occupational Safety and Health Standards, of Title 29 of the Code of Federal Regulations (CFR). Section 120 of 29 CFR 1910 specifically addresses hazardous waste operations and emergency response operations. The remainder of this discussion focuses on clean-up operations. The purpose of this paper is to review areas of employment opportunity in environmental restoration work for health and safety professionals. Safety and health risk analyses are mentioned as one area of opportunity, and these analyses are required by the standards. Site safety and health supervisors will be needed during field operations. Those who enjoy teaching might consider helping to meet the training needs that are mandated. Finally, engineering help both to separate workers from hazards and to improve personal protective equipment, when it must be worn, would benefit those actively involved in environmental restoration activities

  10. An integrated building demolition and waste planning model for the Fernald Site

    International Nuclear Information System (INIS)

    Hampshire, L.H.; Clark, T.R.; Frost, M.L.; Reising, J.W.

    1995-01-01

    The Fernald DOE site will begin full-scale remediation of buildings under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) during the 1995 fiscal year pursuant to a signed Record of Decision. This effort is currently estimated to cost $350 million and span a minimum duration of 8 years, if funding is not a constraint. The identification of the most viable sequence and schedule for the effort involved the development of an integrated planning model and the commissioning of a sitewide planning team. The resulting work product represents the best combination of assumptions and calculations possible at this time and provides information necessary for compliance with the CERCLA Remedial Design documentation requirements for the over 230 component structures governed by the decision. Sequence and integrated schedule development for the decontamination and dismantlement (D ampersand D) of Fernald structures has involved evaluation of current and future utilization of structures, availability of waste storage and staging space, the needs and impacts of other on-going Fernald projects, Resource Conservation and Recovery Act (RCRA) waste management and remediation projects, the layout of site utilities, site hydrology, and the potential sizing, location, and construction rates for an on-property disposal cell

  11. A risk computation model for environmental restoration activities

    Energy Technology Data Exchange (ETDEWEB)

    Droppo, J.B. Jr.; Strenge, D.L.; Buck, J.W.

    1991-01-01

    A risk computation model useful in environmental restoration activities was developed for the US Department of Energy (DOE). This model, the Multimedia Environmental Pollutant Assessment System (MEPAS), can be used to evaluate effects of potential exposures over a broad range of regulatory issues including radioactive carcinogenic, nonradioactive carcinogenic, and noncarcinogenic effects. MEPAS integrates risk computation components. Release, transport, dispersion, deposition, exposure, and uptake computations are linked in a single system for evaluation of air, surface water, ground water, and overland flow transport. MEPAS uses standard computation approaches. Whenever available and appropriate, US Environmental Protection Agency guidance and models were used to facilitate compatibility and acceptance. MEPAS is a computational tool that can be used at several phases of an environmental restoration effort. At a preliminary stage in problem characterization, potential problems can be prioritized. As more data become available, MEPAS can provide an estimate of baseline risks or evaluate environmental monitoring data. In the feasibility stage, MEPAS can compute risk from alternative remedies. However, MEPAS is not designed to replace a detailed risk assessment of the selected remedy. For major problems, it will be appropriate to use a more detailed, risk computation tool for a detailed, site-specific evaluation of the selected remedy. 15 refs., 2 figs.

  12. Physicochemical and mineralogical characterization of uranium-contaminated soils from the Fernald Integrated Demonstration Site

    International Nuclear Information System (INIS)

    Elless, M.P.; Lee, S.Y.; Timpson, M.E.

    1994-01-01

    An integrated approach that utilizes various characterization technologies has been developed for the Uranium Soil Integrated Demonstration program. The Fernald Environmental Restoration Management Corporation site near Cincinnati, Ohio, was selected as the host facility for this demonstration. Characterization of background, untreated contaminated, and treated contaminated soils was performed to assess the contamination and the effect of treatment efforts to remove uranium from these soils. Carbonate minerals were present in the contaminated soils (added for erosion control) but were absent in the nearby background soils. Because of the importance of the carbonate anion to uranium solubility, the occurrence of carbonate minerals in these soils will be an important factor in the development of a successful remediation technology. Uranium partitioning data among several particle-size fractions indicate that conventional soil washing will be ineffective for remediation of these soils and that chemical extraction will be necessary to lower the uranium concentration to the target level (52 mg/kg). Carbonate-based (sodium carbonate/bicarbonate) and acid-based (sulfuric and citric acids) lixiviants were employed for the selective removal of uranium from these soils. Characterization results have identified uranium phosphate minerals as the predominant uranium mineral form in both the untreated and treated soils. The low solubility associated with phosphate minerals is primarily responsible for their occurrence in the posttreated soils. Artificial weathering of the treated soils caused by the treatments, particularly acid-based lixiviants, was documented by their detrimental effects on several physicochemical characteristics of these soils (e.g., soil pH, particle-size distribution, and mineralogy)

  13. Process benchmarking for improvement of environmental restoration activities

    Energy Technology Data Exchange (ETDEWEB)

    Celorie, J.A. [CH2M Hill, Corvallis, OR (United States); Selman, J.R.; Larson, N.B. [Department of Energy, Germantown, MD (United States)

    1995-12-31

    A process benchmarking study was initiated by the Office of Environmental Management (EM) of the US Department of Energy (DOE) to analyze and improve the department`s environmental assessment and environmental restoration (ER) processes. The purpose of this study was to identify specific differences in the processes and implementation procedures used at comparable remediation sites to determine best practices which had the greatest potential to minimize the cost and time required to conduct remedial investigation/ feasibility study (RI/FS) activities. Technical criteria were identified and used to select four DOE, two Department of Defense (DOD), and two Environmental Protection Agency (EPA) restoration sites that exhibited comparable characteristics and regulatory environments. By comparing the process elements and activities executed at the different sites for similar endpoints, best practices were identified for streamlining process elements and minimizing non-value-added activities. Critical measures that influenced process performance were identified and characterized for the sites. This benchmarking study focused on two processes and the internal/external review of documents and the development of the initial evaluation and data collection plan (IEDCP)--since these had a great potential for savings, a high impact on other processes, and a high probability for implementation.

  14. 1999 Environmental Restoration Contractor Revegetation Monitoring Report; TOPICAL

    International Nuclear Information System (INIS)

    K. A. Gano

    1999-01-01

    This report documents the results of revegetation monitoring conducted in early May through early July 1999. Fourth-year monitoring was conducted at the Horn Rapids Landfill, Horseshoe Landfill, and Nike Landfill. Third-year monitoring was conducted on the Bridge Overlook, PSN 72/82, PSN 12/14, and the North Slope Cheatgrass Area. Second-year monitoring was conducted at the 600-104 waste site (2,4-D cleanup site); the 300-FF-1 sagebrush (Artemisia tridentata) and bitterbrush (Purshia tridentata) transplant areas, 2 16-A-25 emergency extension site; and the 200-ZP-1 pipeline. First-year monitoring was conducted at the 300 Area North Process Trench, Environmental Restoration Disposal Facility (ERDF) Mitigation sites, and the 116-C-l Restoration site

  15. Occurrence of Schoenoplectus mucronatus at the U.S. Department of Energy Fernald Preserve

    Energy Technology Data Exchange (ETDEWEB)

    Homer, John; Decker, Ashlee; Bien, Stephanie

    2010-01-01

    Bog bulrush (Schoenoplectus mucronatus) is a perennial wetland species native to Africa, Asia, and Europe. Its documented occurrence in the United States includes California, Hawaii, Iowa, Kentucky, Missouri, New Jersey, New York, Pennsylvania, Washington, and Tennessee. This species spreads through seed, rhizomes, and stolons, and has shown resistance to certain herbicides. Online plant databases do not show the distribution of the species reaching into Ohio or Indiana; however, local experts have indicated that specimens are in both states. Various reports indicate that S. mucronatus is locally abundant but not yet widespread regionally. In recent years, S. mucronatus has become increasingly abundant at the Fernald Preserve, a U.S. Department of Energy site in northwest Hamilton County, Ohio. The 425- hectare (1,050-acre) site has undergone extensive remediation and subsequent ecological restoration, and various wetlands have been constructed across the site. S. mucronatus was first observed at the Fernald Preserve in 2008, in one constructed basin. During monitoring in 2009, S. mucronatus was seen in 8 of 23 basins surveyed. This increase has raised concern that the species may become a regional problem. This poster aims to alert botanists and ecological restoration personnel of the species’ regional occurrence, and prompt discussion of its potential impacts and how it can be controlled.

  16. Environmental restoration and decontamination and decommissioning safety documentation

    International Nuclear Information System (INIS)

    Hansen, J.L.; Frauenholz, L.H.; Kerr, N.R.

    1993-01-01

    This document presents recommendations of a working group designated by the Environmental Restoration and Remediation (ER) and Decontamination and Decommissioning (D ampersand D) subcommittees of the Westinghouse M ampersand O (Management and Operation) Nuclear Facility Safety Committee. A commonalty of approach to safety documentation specific to ER and D ampersand D activities was developed and is summarized below. Allowance for interpretative tolerance and documentation flexibility appropriate to the activity, graded for hazard category, duration, and complexity, was a primary consideration in development of this guidance

  17. Hanford Site Environmental Restoration Program 1994 fiscal year work plan

    International Nuclear Information System (INIS)

    1993-01-01

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D ampersand D); Project Management and Support (PM ampersand S); Surveillance and Maintenance (S ampersand M); and Disposal Facilities (DF)

  18. Environmental Restoration Disposal Facility (Project W-296) Safety Assessment

    International Nuclear Information System (INIS)

    Armstrong, D.L.

    1994-08-01

    This Safety Assessment is based on information derived from the Conceptual Design Report for the Environmental Restoration Disposal Facility (DOE/RL 1994) and ancillary documentation developed during the conceptual design phase of Project W-296. The Safety Assessment has been prepared to support the Solid Waste Burial Ground Interim Safety Basis document. The purpose of the Safety Assessment is to provide an evaluation of the design to determine if the process, as proposed, will comply with US Department of Energy (DOE) Limits for radioactive and hazardous material exposures and be acceptable from an overall health and safety standpoint. The evaluation considered affects on the worker, onsite personnel, the public, and the environment

  19. IMPACTS OF SAFETY and QUALITY IN ENVIRONMENTAL RESTORATION AT HANFORD

    International Nuclear Information System (INIS)

    PREVETTE, S.S.

    2004-01-01

    The aim of this paper is to demonstrate the integration of safety methodology, quality tools, leadership, and teamwork at Hanford and their significant positive impact on safe performance of work. Control charts, Pareto Charts, Dr. W. Edward Deming's Red Bead Experiment, and Dr. Deming's System of Profound Knowledge have been the principal tools and theory of an integrated management system. Coupled with involved leadership and teamwork they have led to significant improvements in worker safety and protection, and environmental restoration at one of the nation's largest nuclear cleanup sites

  20. 76 FR 24050 - Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement, Biscayne National...

    Science.gov (United States)

    2011-04-29

    ... National Park Service Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement... Final Programmatic Environmental Impact Statement for the Coral Reef Restoration Plan, Biscayne National... Impact Statement for the Coral Reef Restoration Plan (Plan/FEIS) for Biscayne National Park, Florida. The...

  1. 75 FR 21650 - Coral Reef Restoration Plan, Draft Programmatic Environmental Impact Statement, Biscayne National...

    Science.gov (United States)

    2010-04-26

    ... DEPARTMENT OF THE INTERIOR National Park Service Coral Reef Restoration Plan, Draft Programmatic... Coral Reef Restoration Plan, Biscayne National Park. SUMMARY: Pursuant to the National Environmental... availability of a Draft Programmatic Environmental Impact Statement (DEIS) for the Coral Reef Restoration Plan...

  2. Characterization and remediation of soil prior to construction of an on-site disposal facility at Fernald

    International Nuclear Information System (INIS)

    Hunt, A.; Jones, G.; Nelson, K.

    1998-03-01

    During the production years at the Feed Materials Production Center (FMPC), the soil of the site and the surrounding areas was surficially impacted by airborne contamination. The volume of impacted soil is estimated at 2.2 million cubic yards. During site remediation, this contamination will be excavated, characterized, and disposed of. In 1986 the US Environmental Protection Agency (EPA) and the Department of Energy (DOE) entered into a Federal Facility Compliance Agreement (FFCA) covering environmental impacts associated with the FMPC. A site wide Remedial Investigation/Feasibility Study (RI/FS) was initiated pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act, as amended by the Superfund Amendments and Reauthorization Act (CERCLA). The DOE has completed the RI/FS process and has received approval of the final Records of Decision. The name of the facility was changed to the Fernald Environmental Management Project (FEMP) to emphasize the change in mission to environmental restoration. Remedial actions which address similar scopes of work or types of contaminated media have been grouped into remedial projects for the purpose of managing the remediation of the FEMP. The Soil Characterization and Excavation Project (SCEP) will address the remediation of FEMP soils, certain waste units, at- and below-grade material, and will certify attainment of the final remedial limits (FRLs) for the FEMP. The FEMP will be using an on-site facility for low level radioactive waste disposal. The facility will be an above-ground engineered structure constructed of geological material. The area designated for construction of the base of the on-site disposal facility (OSDF) is referred to as the footprint. Contaminated soil within the footprint must be identified and remediated. Excavation of Phase 1, the first of seven remediation areas, is complete

  3. Strategies of environmental restoration of contaminated areas after nuclear accident

    International Nuclear Information System (INIS)

    Gutierrez, Jose; Vazquez, Carmen

    2001-01-01

    The paper is framed in the area of restoration of contaminated environments after a nuclear accident. It considers the local specific characteristics of the contaminated scenario as a suitable way to optimize the intervention strategy. In this way, a system of classification of scenarios has been developed according to their potential for transferring radiation and radioactivity to man and their features having influence on the performance of the countermeasures. The established methodology provides the opportunity to jointly consider different types of systems (urban, agricultural, grazing and forest) in the analysis. Also, the consideration in the procedure of factors, not radiological in nature, related to the applicability of the countermeasures, their cost and their secondary effects (including the management and disposal of the wastes generated during the intervention) will improve the management of restoration. As final result a user friendly decision-aiding computerised system has been developed. The system is able to select the best local strategy of restoration when a post-accidental situation with environmental contamination is faced. (author)

  4. Mining in New Caledonia: environmental stakes and restoration opportunities.

    Science.gov (United States)

    Losfeld, Guillaume; L'Huillier, Laurent; Fogliani, Bruno; Jaffré, Tanguy; Grison, Claude

    2015-04-01

    New Caledonia is a widely recognised marine and terrestrial biodiversity hot spot. However, this unique environment is under increasing anthropogenic pressure. Major threats are related to land cover change and include fire, urban sprawling and mining. Resulting habitat loss and fragmentation end up in serious erosion of the local biodiversity. Mining is of particular concern due to its economic significance for the island. Open cast mines were exploited there since 1873, and scraping out soil to access ores wipes out flora. Resulting perturbations on water flows and dramatic soil erosion lead to metal-rich sediment transport downstream into rivers and the lagoon. Conflicting environmental and economic aspects of mining are discussed in this paper. However, mining practices are also improving, and where impacts are inescapable ecological restoration is now considered. Past and ongoing experiences in the restoration of New Caledonian terrestrial ecosystems are presented and discussed here. Economic use of the local floristic diversity could also promote conservation and restoration, while providing alternative incomes. In this regard, Ecocatalysis, an innovative approach to make use of metal hyperaccumulating plants, is of particular interest.

  5. 75 FR 66800 - National Environmental Policy Act; Wallops Flight Facility Shoreline Restoration and...

    Science.gov (United States)

    2010-10-29

    ... SPACE ADMINISTRATION National Environmental Policy Act; Wallops Flight Facility Shoreline Restoration... Wallops Flight Facility (WFF) Shoreline Restoration and Infrastructure Protection Program (SRIPP). SUMMARY... shoreline and the infrastructure behind it. Alternative One, NASA's preferred alternative, would include...

  6. 75 FR 8997 - National Environmental Policy Act; Wallops Flight Facility Shoreline Restoration and...

    Science.gov (United States)

    2010-02-26

    ... SPACE ADMINISTRATION National Environmental Policy Act; Wallops Flight Facility Shoreline Restoration... Wallops Flight Facility (WFF) Shoreline Restoration and Infrastructure Protection Program (SRIPP). SUMMARY... from the Wallops Island shoreline and the infrastructure behind it. Alternative One, NASA's preferred...

  7. Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

  8. Pollution prevention and waste minimization opportunity assessment in environmental restoration

    International Nuclear Information System (INIS)

    Roybal, J.A.; Willison, C.P.

    1997-01-01

    The Environmental Restoration (ER) Project at Sandia National Laboratories implicitly subscribed to the philosophy of pollution prevention and waste minimization. As a result of a Department of Energy (DOE) offer, Pollution Prevention Opportunity Assessments (PPOA) were conducted at two ER sites and a decontamination and Demolition (D and D) site. The purpose of one of the PPOAs was to identify pollution prevention (P2) opportunities during environmental remediation at the Classified Waste Landfill located at Sandia National Laboratories, New Mexico (SNL/NM). The remediation activities at this site are scheduled to begin in the fall of 1997. The PPOA included presentations by the team members, a tour of the site, and a brainstorming session to list the waste streams, identify P2 opportunities and rank them in order of priority. Twenty-five P2 opportunities were identified during the brainstorming session of which twenty-two opportunities were selected for further investigation. Those twenty-two opportunities are discussed in this paper. A cost benefit analysis was performed for each P2 opportunity based on the estimated waste volume, feasibility, and cost. Pollution Prevention by Design (P2D) was incorporated into the PPOA to introduce waste minimization techniques that can be used during the planning phase of restoration projects

  9. Environmental Restoration Program quality system requirements for the Hanford Site

    International Nuclear Information System (INIS)

    Cote, R.F.

    1993-11-01

    This document defines the quality system requirements for the US Department of Energy, Richland Operations Office, Environmental Restoration Program at the Hanford Site. The Quality System Requirements (OSR) for the Hanford Site integrates quality assurance requirements from the US Department of Energy Orders, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), and applicable industry standards into a single source document for the development of quality systems applicable to the Environmental Restoration Program activities. This document, based on fifteen criteria and divided intro three parts, provides user organizations with the flexibility to incorporate only those criteria and parts applicable to their specific scopes of work. The requirements of this document shall be applied to activities that affect quality based on a graded approach that takes into consideration the risk inherent in, as well as the importance of, specific items, services, and activities in terms of meeting ER Program objectives and customer expectations. The individual quality systems developed in accordance with this document are intended to provide an integrated management control system that assures the conduct of ER Program activities in a manner that protects human health and the environment

  10. The INEL approach: Environmental Restoration Program management and implementation methodology

    International Nuclear Information System (INIS)

    1996-01-01

    The overall objectives of the INEL Environmental Restoration (ER) Program management approach are to facilitate meeting mission needs through the successful implementation of a sound, and effective project management philosophy. This paper outlines the steps taken to develop the ER program, and explains further the implementing tools and processes used to achieve what can be viewed as fundamental to a successful program. The various examples provided will demonstrate how the strategies for implementing these operating philosophies are actually present and at work throughout the program, in spite of budget drills and organizational changes within DOE and the implementing contractor. A few of the challenges and successes of the INEL Environmental Restoration Program have included: a) completion of all enforceable milestones to date, b) acceleration of enforceable milestones, c) managing funds to reduce uncosted obligations at year end by utilizing greater than 99% of FY-95 budget, d) an exemplary safety record, e) developing a strategy for partial Delisting of the INEL by the year 2000, f) actively dealing with Natural Resource Damages Assessment issues, g) the achievement of significant project cost reductions, h) and implementation of a partnering charter and application of front end quality principles

  11. Environmental monitoring, restoration and assessment: What have we learned?

    International Nuclear Information System (INIS)

    Gray, R.H.

    1990-01-01

    The Twenty-Eighth Hanford Symposium on Health and the Environment was held in Richland, Washington, October 16--19, 1989. The symposium was sponsored by the US Department of Energy and the Pacific Northwest Laboratory, operated by Battelle Memorial Institute. The symposium was organized to review and evaluate some of the monitoring and assessment programs that have been conducted or are currently in place. Potential health and environmental effects of energy-related and other industrial activities have been monitored and assessed at various government and private facilities for over three decades. Most monitoring is required under government regulations; some monitoring is implemented because facility operators consider it prudent practice. As a result of these activities, there is now a substantial radiological, physical, and chemical data base for various environmental components, both in the United States and abroad. Symposium participants, both platform and poster presenters, were asked to consider, among other topics, the following: Has the expenditure of millions of dollars for radiological monitoring and assessment activities been worth the effort? How do we decide when enough monitoring is enough? Can we adequately assess the impacts of nonradiological components -- both inorganic and organic -- of wastes? Are current regulatory requirements too restrictive or too lenient? Can monitoring and assessment be made more cost effective? Papers were solicited in the areas of environmental monitoring; environmental regulations; remediation, restoration, and decommissioning; modeling and dose assessment; uncertainty, design, and data analysis; and data management and quality assurance. Individual reports are processed separately for the databases

  12. Uranium production and environmental restoration at Priargunsky Centre (Russian Federation)

    International Nuclear Information System (INIS)

    Shatalov, V.V.; Boitsov, A.V.; Nikolsky, A.L.; Chernigov, V.G.; Ovseichuk, V.A.

    2002-01-01

    The state enterprise 'Priargunsky Mining and Chemical Production Association' (PPGHO) is the only active uranium production centre in Russia in last decade. Mining has been operated since 1968 by two open pits and four underground mines. It is based on resources of 19 volcanic-type deposits of Streltsovsk U-ore region situated at the area of 150 km 2 . Milling and processing has been carried out since 1974 at the local hydrometallurgical plant. Since the mid 1980s, limited amount of uranium is produced by heap and block leaching methods. High level of total production marks PPGHO as one of the outstanding uranium production centers worldwide. Significant amount of solid, liquid and gas wastes have been generated for more than 30 years. The principal environmental contamination comes from waste rock piles, mine water and tailing ponds. Liquid waste seepage through tailing pond bed can essentially contaminate underground waters. The principal environmental remediation activities are: waste rock dumps and open pits rehabilitation; waste rock utilization for industrial needs; heap and block leaching mining development, strengthening dam bodies and construction intercepting wells below the tailing pond dam, hydrogeological monitoring, upgrade of mine water treatment unit. Waste is being managed by the environmental service team of PPGHO. Environmental restoration activities, including rehabilitation of the territories and waste utilization, are implemented gradually in line with decommissioning of enterprise's particular facilities. (author)

  13. Environmental monitoring, restoration and assessment: What have we learned

    Energy Technology Data Exchange (ETDEWEB)

    Gray, R.H. (ed.)

    1990-01-01

    The Twenty-Eighth Hanford Symposium on Health and the Environment was held in Richland, Washington, October 16--19, 1989. The symposium was sponsored by the US Department of Energy and the Pacific Northwest Laboratory, operated by Battelle Memorial Institute. The symposium was organized to review and evaluate some of the monitoring and assessment programs that have been conducted or are currently in place. Potential health and environmental effects of energy-related and other industrial activities have been monitored and assessed at various government and private facilities for over three decades. Most monitoring is required under government regulations; some monitoring is implemented because facility operators consider it prudent practice. As a result of these activities, there is now a substantial radiological, physical, and chemical data base for various environmental components, both in the United States and abroad. Symposium participants, both platform and poster presenters, were asked to consider, among other topics, the following: Has the expenditure of millions of dollars for radiological monitoring and assessment activities been worth the effort How do we decide when enough monitoring is enough Can we adequately assess the impacts of nonradiological components -- both inorganic and organic -- of wastes Are current regulatory requirements too restrictive or too lenient Can monitoring and assessment be made more cost effective Papers were solicited in the areas of environmental monitoring; environmental regulations; remediation, restoration, and decommissioning; modeling and dose assessment; uncertainty, design, and data analysis; and data management and quality assurance. Individual reports are processed separately for the databases.

  14. Human health and ecological risks from environmental restoration and waste management activities

    International Nuclear Information System (INIS)

    Pehlman, P.A.; Wollert, D.A.; Phillippi, R.H.

    1994-01-01

    This paper summarizes the methodologies for estimating human health and ecological risks resulting from Environmental Restoration and Waste Management activities across the Department of Energy (DOE) complex. DOE is currently assessing these activities as part of the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement (EM-PEIS)

  15. Human health and ecological risks from environmental restoration and waste management activities

    Energy Technology Data Exchange (ETDEWEB)

    Pehlman, P.A.; Wollert, D.A.; Phillippi, R.H. [Oak Ridge National Lab., TN (United States)] [and others

    1994-12-31

    This paper summarizes the methodologies for estimating human health and ecological risks resulting from Environmental Restoration and Waste Management activities across the Department of Energy (DOE) complex. DOE is currently assessing these activities as part of the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement (EM-PEIS).

  16. Environmental Restoration Contractor Waste Minimization and Pollution Prevention Plan

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1994-11-01

    The purpose of this plan is to establish the Environmental Restoration Contractor (ERC) Waste Minimization and Pollution Prevention (WMin/P2) Program and outline the activities and schedules that will be employed to reduce the quantity and toxicity of wastes generated as a result of restoration and remediation activities. It is intended to satisfy the US Department of Energy (DOE) and other legal requirements. As such, the Pollution Prevention Awareness program required by DOE Order 5400.1 is included with the Pollution Prevention Program. This plan is also intended to aid projects in meeting and documenting compliance with the various requirements for WMin/P2, and contains the policy, objectives, strategy, and support activities of the WMin/P2 program. The basic elements of the plan are pollution prevention goals, waste assessments of major waste streams, implementation of feasible waste minimization opportunities, and a process for reporting achievements. Various pollution prevention techniques will be implemented with the support of employee training and awareness programs to reduce waste and still meet applicable requirements. Information about the Hanford Site is in the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan

  17. Radiation legacy of the 20th century: Environmental restoration

    International Nuclear Information System (INIS)

    2002-04-01

    As a result of events in the twentieth century, mainly related to the development of nuclear energy, mankind has been forced to deal with the restoration of the environments which contain radioactive residues. The International Conference RADLEG-200 was particularly focused on the radioactive legacy of the countries of the former Soviet Union and eastern Europe. By means of reviews and case studies the conference assessed the overall situation with respect to the contaminated sites and sources of potential environmental contamination and evaluated the achievements of rehabilitation and remediation programmes as well as identifying future needs in this field. The Conference was attended by 266 participants from 16 countries and 6 international organizations with 49 papers presented orally and 64 presented as posters. This publication contains the 49 orally presented papers, each of them was indexed separately

  18. The optimized baseline project: Reinventing environmental restoration at Hanford

    International Nuclear Information System (INIS)

    Goodenough, J.D.; Janaskie, M.T.; Kleinen, P.J.

    1994-01-01

    The U.S. Department of Energy Richland Operations Office (DOE-RL) is using a strategic planning effort (termed the Optimized Baseline Project) to develop a new approach to the Hanford Environmental Restoration program. This effort seeks to achieve a quantum leap improvement in performance through results oriented prioritization of activities. This effort was conducted in parallel with the renegotiation of the Tri-Party Agreement and provided DOE with an opportunity to propose innovative initiatives to promote cost effectiveness, accelerate progress in the Hanford Environmental Restoration Program and involve stakeholders in the decision-making process. The Optimized Baseline project is an innovative approach to program planning and decision-making in several respects. First, the process is a top down, value driven effort that responds to values held by DOE, the regulatory community and the public. Second, planning is conducted in a way that reinforces the technical management process at Richland, involves the regulatory community in substantive decisions, and includes the public. Third, the Optimized Baseline Project is being conducted as part of a sitewide Hanford initiative to reinvent Government. The planning process used for the Optimized Baseline Project has many potential applications at other sites and in other programs where there is a need to build consensus among diverse, independent groups of stakeholders and decisionmakers. The project has successfully developed and demonstrated an innovative approach to program planning that accelerates the pace of cleanup, involves the regulators as partners with DOE in priority setting, and builds public understanding and support for the program through meaningful opportunities for involvement

  19. Environmental Restoration Operations: Consolidated Quarterly Report January -March 2017

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, John R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-07-01

    This Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) provides the status of ongoing corrective action activities being implemented at Sandia National Laboratories, New Mexico (SNL/NM) during the January, February, and March 2017 quarterly reporting period. Table I-1 lists the Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) identified for corrective action at SNL/NM. Sections I.2.1 and I.2.2 summarize the work completed during this quarter. Section I.2.1 summarizes the quarterly activities at sites undergoing corrective action field activities. Field activities are conducted at the three groundwater AOCs (Burn Site Groundwater [BSG AOC], Technical Area [TA]-V Groundwater [TAVG AOC], and Tijeras Arroyo Groundwater [TAG AOC]). Section I.2.2 summarizes quarterly activities at sites where the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB) issued a certificate of completion and the sites are in the corrective action complete (CAC) regulatory process. Currently, SWMUs 8 and 58, 68, 149, 154, and 502 are in the CAC regulatory process. Corrective action activities are deferred at the Long Sled Track (SWMU 83), the Gun Facilities (SWMU 84), and the Short Sled Track (SWMU 240) because these three sites are active mission facilities. These three active mission sites are located in TA-III. This Sandia National Laboratories, New Mexico Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) fulfills all quarterly reporting requirements set forth in the Resource Conservation and Recovery Act Facility Operating Permit and the Compliance Order on Consent.

  20. Antibacterial compounds from Salvia adenophora Fernald (Lamiaceae).

    Science.gov (United States)

    Bisio, Angela; Schito, Anna Maria; Ebrahimi, Samad Nejad; Hamburger, Matthias; Mele, Giacomo; Piatti, Gabriella; Romussi, Giovanni; Dal Piaz, Fabrizio; De Tommasi, Nunziatina

    2015-02-01

    From the aerial parts of Salvia adenophora Fernald four derivatives of 12-oxo-phytodienoic acid (1-4) together with five clerodane diterpenoids (5, 6, 8-10), and one known diterpene (7) have been isolated. Compounds 1-6 and 8-10 are described for the first time. The structures were established by extensive 1D, 2D NMR and HRESI-TOFMS spectroscopic methods. Finally, the absolute configuration has been established by comparing of experimental and quantum chemical calculation of ECD spectra. Despite a total lack of antimicrobial activity of the plant extract, hinting to the existence of antagonistic interactions in the crude material, three oxylipins (2-4) displayed a promising inhibition on Gram-positive multidrug-resistant clinical strains including Staphylococcus aureus, Streptococcus agalactiae and, particularly, Staphylococcus epidermidis, while the compounds 9 and 10 revealed a specific and strain-dependent activity against S. epidermidis. Interestingly, the inhibition provided by these compounds was independent of the resistance patterns of these pathogens to classic antibiotics. No action was reported on Gram-negative strains nor on Candida albicans. These results confirm that clerodanes and, particularly, prostaglandin-like compounds can be considered as interesting antimicrobial agents deserving further study. Copyright © 2014 Elsevier Ltd. All rights reserved.

  1. Organizing for public involvement in Fernald decision-making

    International Nuclear Information System (INIS)

    Morgan, K.L.; Hoopes, J.

    1993-01-01

    Fernald is returning to the basics of interpersonal communication as a cornerstone of its public involvement program. The guiding premise behind this concept is the belief that face-to-face interaction between people is more likely to build trust and confidence than public meetings, news releases and other traditional public information techniques. A network of project spokespersons, called ''envoys,'' is being organized to develop person-to-person relationships with people interested in the future of Fernald. To support this approach, public affairs personnel are adopting roles as management consultants and communications coaches in addition to serving in their traditional role as public information specialists. Early observations seem to show signs of improvement in the level of public trust in Fernald decision-makers

  2. Identifying environmental safety and health requirements for an Environmental Restoration Management Contractor

    International Nuclear Information System (INIS)

    Beckman, W.H.; Cossel, S.C.; Alhadeff, N.; Lindamood, S.B.; Beers, J.A.

    1993-10-01

    The purpose of the Standards/Requirements Identification Program, developed partially in response to the Defense Nuclear Facilities Safety Board Recommendation 90-2, was to identify applicable requirements that established the Environmental Restoration Management Contractor's (ERMC) responsibilities and authorities under the Environmental Restoration Management Contract, determine the adequacy of these requirements, ascertain a baseline level of compliance with them, and implement a maintenance program that would keep the program current as requirements or compliance levels change. The resultant Standards/Requirements Identification Documents (S/RIDs) consolidate the applicable requirements. These documents govern the development of procedures and manuals to ensure compliance with the requirements. Twenty-four such documents, corresponding with each functional area identified at the site, are to be issued. These requirements are included in the contractor's management plan

  3. Site environmental report summary

    International Nuclear Information System (INIS)

    1992-01-01

    In this summary of the Fernald 1992 Site Environmental Report the authors will describe the impact of the Fernald site on man and the environment and provide results from the ongoing Environmental Monitoring Program. Also included is a summary of the data obtained from sampling conducted to determine if the site complies with DOE, US Environmental Protection Agency (USEPA), and Ohio EPA (OEPA) requirements. These requirements are set to protect both man and the environment

  4. Environmental Restoration Site-Specific Plan for the Portsmouth Gaseous Diffusion Plant, FY 93

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of this Site-Specific Plan (SSP) is to describe past, present, and future activities undertaken to implement Environmental Restoration and Waste Management goals at the Portsmouth Gaseous Diffusion Plant (PORTS). The SSP is presented in sections emphasizing Environmental Restoration description of activities, resources, and milestones

  5. 77 FR 56671 - Draft Shoreline Restoration Management Plan and Environmental Impact Statement for Indiana Dunes...

    Science.gov (United States)

    2012-09-13

    ...; 6065-4000-409] Draft Shoreline Restoration Management Plan and Environmental Impact Statement for...., Section 4332(2)(c), the National Park Service announces the availability of the Draft Shoreline.... DATES: The Draft Shoreline Restoration Management Plan and Environmental Impact Statement (SRMP) will be...

  6. 76 FR 11426 - Gulf Spill Restoration Planning; Public Scoping Meetings for the Programmatic Environmental...

    Science.gov (United States)

    2011-03-02

    ... National Oceanic and Atmospheric Administration RIN 0648-XA222 Gulf Spill Restoration Planning; Public Scoping Meetings for the Programmatic Environmental Impact Statement for the Deepwater Horizon Oil Spill..., will begin restoration scoping and preparation of a Programmatic Environmental Impact Statement (PEIS...

  7. Preoperational baseline and site characterization report for the Environmental Restoration Disposal Facility: Volume 1. Revision 1

    International Nuclear Information System (INIS)

    Weekes, D.C.; Ford, B.H.; Jaeger, G.K.

    1996-09-01

    This site characterization report provides the results of the field data collection activities for the Environmental Restoration Disposal Facility site. Information gathered on the geology, hydrology, ecology, chemistry, and cultural resources of the area is presented. The Environmental Restoration Disposal Facility is located at the Hanford Site in Richland, Washington

  8. Dose and risk assessment approach for the Fernald CERCLA D ampersand D Project

    International Nuclear Information System (INIS)

    Throckmorton, J.D.; Clark, T.R.; Waligora, S.J. Jr.; Haaker, R.F.

    1994-01-01

    At the Fernald Environmental Management Project (FEMP) the uranium processing facilities used from the 1952 through 1989 are near or beyond their intended design life. These current conditions present an increasing probability for future releases of hazardous substances to the environment. To support a decision by the U.S. Department of Energy (DOE) and the Environmental Protection Agency (EPA) to remediate the buildings, a dose and risk assessment was performed to determine the extent of exposure that would be associated with the controlled decontamination and dismantlement (D ampersand D) of the Fernald facilities. A conceptual risk assessment model was developed, with exposure mechanisms and associated pathways for each potential receptor. The three receptor groups were defined as: the remediation workers, other on-site workers (those not performing D ampersand D), and off-site residents. For use in the conceptual model, an airborne source term was developed through process knowledge, other historical information and data, and air sample data from within the facilities. Individual and collective doses and risks were developed for each receptor and for each population group. The risk assessment demonstrated that all exposures resulting from the action would be within the acceptable DOE administrative control level of 2.0 rem per year for occupational workers and the acceptable EPA risk range from 10 -6 to 10 -4 for the general public

  9. Environmental Restoration Operations Consolidated Quarterly Report: July-September 2016

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, John R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-01-01

    This Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) provides the status of ongoing corrective action activities being implemented at Sandia National Laboratories, New Mexico (SNL/NM) during the July, August, and September 2016 quarterly reporting period. The Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) identified for corrective action at SNL/NM are listed in Table I-1. Sections I.2.1 and I.2.2 summarize the work completed during this quarter. Section I.2.1 summarizes the quarterly activities at sites undergoing corrective action field activities. Field activities are conducted at the three groundwater AOCs (Burn Site Groundwater [BSG AOC], Technical Area [TA]-V Groundwater [TAVG AOC], and Tijeras Arroyo Groundwater [TAG AOC]). Section I.2.2 summarizes quarterly activities at sites where the New Mexico Environment Department (NMED) issued a certificate of completion and the sites are in the corrective action complete (CAC) regulatory process. Currently, SWMUs 8 and 58, 68, 149, 154, and 502 are in the CAC regulatory process. Corrective action activities are deferred at the Long Sled Track (SWMU 83), the Gun Facilities (SWMU 84), and the Short Sled Track (SWMU 240) because these three sites are active mission facilities. These three active sites are located in TA-III.

  10. Groundwater protection plan for the Environmental Restoration Disposal Facility

    International Nuclear Information System (INIS)

    Weekes, D.C.; Jaeger, G.K.; McMahon, W.J.; Ford, B.H.

    1996-01-01

    This document is the groundwater protection plan for the Environmental Restoration Disposal Facility (ERDF) Project. This plan is prepared based on the assumption that the ERDF will receive waste containing hazardous/dangerous constituents, radioactive constituents, and combinations of both. The purpose of this plan is to establish a groundwater monitoring program that (1) meets the intent of the applicable or relevant and appropriate requirements, (2) documents baseline groundwater conditions, (3) monitors those conditions for change, and (4) allows for modifications to groundwater sampling if required by the leachate management program. Groundwater samples indicate the occurrence of preexisting groundwater contamination in the uppermost unconfined aquifer below the ERDF Project site, as a result of past waste-water discharges in the 200 West Area. Therefore, it is necessary for the ERDF to establish baseline groundwater quality conditions and to monitor changes in the baseline over time. The groundwater monitoring program presented in this plan will provide the means to assess onsite and offsite impacts to the groundwater. In addition, a separate leachate management program will provide an indication of whether the liners are performing within design standards

  11. Cost results from the 1994 Fernald characterization field demonstration for uranium-contaminated soils

    International Nuclear Information System (INIS)

    Douthat, D.M.; Stewart, R.N.; Armstrong, A.Q.

    1995-04-01

    One of the principal objectives of the US Department of Energy (DOE) Office of Technology Development is to develop an optimum integrated system of technologies for removing uranium substances from soil. This system of technologies, through demonstration, must be proven in terms of cost reduction, waste minimization, risk reduction, and user applicability. To evaluate the effectiveness of these technologies, a field demonstration was conducted at the Fernald site in the summer of 1994. Fernald was selected as the host site for the demonstration based on environmental problems stemming from past production of uranium metal for defense-related applications. The following six alternative technologies were developed and/or demonstrated by the principal investigators in the Characterization Task Group at the field demonstration: (1) beta scintillation detector by Pacific Northwest Laboratory (PNL), (2) in situ gamma detector by PNL, (3) mobile laser ablation-inductively coupled plasma/atomic emission spectrometry (LA-ICP/AES) laboratory by Ames Laboratory, (4) long-range alpha detector (LRAD) by Los Alamos National Laboratory (LANL), (5) passive radon monitoring by ORNL, and (6) electret ion chamber by ORNL

  12. LANL environmental restoration site ranking system: System description. Final report

    International Nuclear Information System (INIS)

    Merkhofer, L.; Kann, A.; Voth, M.

    1992-01-01

    The basic structure of the LANL Environmental Restoration (ER) Site Ranking System and its use are described in this document. A related document, Instructions for Generating Inputs for the LANL ER Site Ranking System, contains detailed descriptions of the methods by which necessary inputs for the system will be generated. LANL has long recognized the need to provide a consistent basis for comparing the risks and other adverse consequences associated with the various waste problems at the Lab. The LANL ER Site Ranking System is being developed to help address this need. The specific purpose of the system is to help improve, defend, and explain prioritization decisions at the Potential Release Site (PRS) and Operable Unit (OU) level. The precise relationship of the Site Ranking System to the planning and overall budget processes is yet to be determined, as the system is still evolving. Generally speaking, the Site Ranking System will be used as a decision aid. That is, the system will be used to aid in the planning and budgetary decision-making process. It will never be used alone to make decisions. Like all models, the system can provide only a partial and approximate accounting of the factors important to budget and planning decisions. Decision makers at LANL will have to consider factors outside of the formal system when making final choices. Some of these other factors are regulatory requirements, DOE policy, and public concern. The main value of the site ranking system, therefore, is not the precise numbers it generates, but rather the general insights it provides

  13. LANL environmental restoration site ranking system: System description. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Merkhofer, L.; Kann, A.; Voth, M. [Applied Decision Analysis, Inc., Menlo Park, CA (United States)

    1992-10-13

    The basic structure of the LANL Environmental Restoration (ER) Site Ranking System and its use are described in this document. A related document, Instructions for Generating Inputs for the LANL ER Site Ranking System, contains detailed descriptions of the methods by which necessary inputs for the system will be generated. LANL has long recognized the need to provide a consistent basis for comparing the risks and other adverse consequences associated with the various waste problems at the Lab. The LANL ER Site Ranking System is being developed to help address this need. The specific purpose of the system is to help improve, defend, and explain prioritization decisions at the Potential Release Site (PRS) and Operable Unit (OU) level. The precise relationship of the Site Ranking System to the planning and overall budget processes is yet to be determined, as the system is still evolving. Generally speaking, the Site Ranking System will be used as a decision aid. That is, the system will be used to aid in the planning and budgetary decision-making process. It will never be used alone to make decisions. Like all models, the system can provide only a partial and approximate accounting of the factors important to budget and planning decisions. Decision makers at LANL will have to consider factors outside of the formal system when making final choices. Some of these other factors are regulatory requirements, DOE policy, and public concern. The main value of the site ranking system, therefore, is not the precise numbers it generates, but rather the general insights it provides.

  14. Research and development for DOE environmental restoration and waste management

    International Nuclear Information System (INIS)

    Erickson, M.D.; Borys, S.S.; Bugielski, D.; Lien, S.C.T.; Hain, K.E.

    1991-01-01

    The US Department of Energy (DOE) recently consolidated its environmental restoration and waste management activities. Within that new organization, DOE has committed to support Research, Development, Demonstration, Testing and Evaluation (RDDT ampersand E) activities with the following objectives: rapidly advance beyond currently available technologies; provide solutions to key technical issues that will improve effectiveness, efficiency, and safety; and enhance DOE's ability to meet its 30-year compliance and cleanup goals. DOE has already supported a number of R ampersand D activities in this area and plans to continue that support in the future. DOE's Office of Technology Development is interested in eliciting broad participation from qualified organizations who can contribute to RDDT ampersand E activities. This presentation addresses the on-going and future R ampersand D, with an emphasis on the private sector activities. To focus private sector capabilities on the high-priority needs of DOE, a series of competitive solicitations was started in FY 1990. On May 1, 1990, on behalf of DOE's Office of Technology Development, Argonne National Laboratory issued a Request for Proposals that solicited proposals for research and development in the areas of (1) groundwater remediation, (2) soil remediation, (3) characterization of contamination and geological and hydrological features, and (4) containment of contaminated sites. In response to this solicitation, Argonne National Laboratory received 147 proposals. Fifteen of the proposals totaling $5.7 million were funded in FY 1990. The scope of work and evaluation criteria used in the procurement and the workscope of the resultant contracts are reviewed in this paper. The FY 1991 plans for competitive private sector research and development activities will also be presented at the conference. Funding levels, technical workscope, evaluation criteria, and schedule for the FY 1991 Request for Proposals will be detailed. 2

  15. Risk-based priority scoring for Brookhaven National Laboratory environmental restoration programs

    International Nuclear Information System (INIS)

    Morris, S.C.; Meinhold, A.F.

    1995-05-01

    This report describes the process of estimating the risk associated with environmental restoration programs under the Brookhaven National Laboratory Office of Environmental Restoration. The process was part of an effort across all Department of Energy facilities to provide a consistent framework to communicate risk information about the facilities to senior managers in the DOE Office of Environmental Management to foster understanding of risk activities across programs. the risk evaluation was a qualitative exercise. Categories considered included: Public health and safety; site personnel safety and health; compliance; mission impact; cost-effective risk management; environmental protection; inherent worker risk; environmental effects of clean-up; and social, cultural, political, and economic impacts

  16. 75 FR 29336 - Penobscot River Restoration Trust; Notice of Availability of Final Environmental Assessment

    Science.gov (United States)

    2010-05-25

    ...-019] Penobscot River Restoration Trust; Notice of Availability of Final Environmental Assessment May... River Restoration Trust (licensee) on November 7, 2008, requesting Commission approval to surrender the... and Piscataquis Rivers in Penobscot County, Maine. The licensee proposes to surrender the project...

  17. 75 FR 52969 - Final Environmental Impact Statement; Prisoners Harbor Wetland Restoration, Santa Cruz Island...

    Science.gov (United States)

    2010-08-30

    ... DEPARTMENT OF THE INTERIOR National Park Service Final Environmental Impact Statement; Prisoners Harbor Wetland Restoration, Santa Cruz Island, Channel Islands National Park, Santa Barbara County, CA... implement restoration of palustrine wetlands and deepwater habitat at Prisoners Harbor, as well as remove a...

  18. Mineral exploitation by surface mining and environmental restoration. Explotacion minera a cielo abierto y restauracion ambiental

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    The subject of environmental restoration of zones affected by the opencast exploitation of coal, is one of the most interesting for mineral zones since at the end of the industrial process the reclaimed land is appropriate for subsequent use. In all, HUNOSA has restored more than 1000 Ha of pasture. 1 fig.

  19. Probabilistic comparison of alternative characterization technologies at the Fernald Uranium-in-Soils Integrated Demonstration Project

    International Nuclear Information System (INIS)

    Rautman, C.A.; McGraw, M.A.; Istok, J.D.; Sigda, J.M.; Kaplan, P.G.

    1993-01-01

    The performance of four alternative characterization technologies proposed for use in characterization of surficial uranium contamination in soil at the Incinerator and Drum Baling Areas at the Fernald Environmental Management Project in southwestern Ohio has been evaluated using a probabilistic, risk-based decision-analysis methodology. The basis of comparison is to minimize a computed total cost for environmental cleanup. This total-cost-based approach provides a framework for evaluating the trade-offs among remedial investigation, the remedial design, and the risk of regulatory penalties. The approach explicitly recognizes the value of information provided by remedial investigation; additional measurements are only valuable to the extent that the information they provide reduces total cost

  20. Environmental Restoration and Waste Management Site-Specific Plan (SSP) for fiscal year 1992 (FY92)

    International Nuclear Information System (INIS)

    1991-09-01

    The FY-92 Site-Specific Plan (FY-92 SSP) for environmental restoration and waste management at the Idaho National Engineering Laboratory (INEL) is designed to provide the reader with easy access to the status of environmental restoration and waste management activities at INEL. The first chapter provides background on INIEL's physical environment, site history and mission, and general information about the site and its facilities. In addition, this chapter discusses the inter-relationships between the Site Specific Plan, the Environmental Restoration and Waste Management Five-Year Plan, the environmental restoration and waste management prioritization systems, and the Activity Data Sheets (ADSs) for environmental restoration and waste management. This discussion should help readers understand what the SSP is and how it fits into the environmental restoration and waste management process at INEL. This understanding should provide the reader with a better context for understanding the discussions in the SSP as well as a better feel for how and what to comment on during the public comment period that will be held from the first of September through the end of October 1991

  1. Environmentally Sensitive Areas Surveys Program threatened and endangered species survey: Progress report. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    King, A.L.; Awl, D.J.; Gabrielsen, C.A.

    1994-09-01

    The Endangered Species Act (originally passed in 1973) is a Federal statute that protects both animal and plant species. The Endangered Species Act identifies species which are, without careful management, in danger of becoming extinct and species that are considered threatened. Along with the designation of threatened or endangered, the Endangered Species Act provides for the identification of appropriate habitat for these species. Since 1993, the United States Department of Energy`s (DOE) Environmental Restoration (ER) Program has supported a program to survey the Oak Ridge Reservation (ORR) for threatened and endangered species. The Environmentally Sensitive Areas Surveys Program initiated vascular plant surveys during fiscal year 1993 and vertebrate animal surveys during fiscal year 1994 to determine the baseline condition of threatened and endangered species on the ORR at the present time. Data collected during these surveys are currently aiding Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Remedial Investigations on the ORR. They also provide data for ER and Waste Management decision documents, ensure that decisions have technical and legal defensibility, provide a baseline for ensuring compliance with principal legal requirements and will increase public confidence in DOE`s adherence to all related environmental resources rules, laws, regulations, and instructions. This report discusses the progress to date of the threatened and endangered species surveys of the ORR.

  2. Environmental Restoration and Waste Management: An Introduction. Student Edition.

    Science.gov (United States)

    Department of Energy, Washington, DC.

    This technical document focuses on the Department of Energy's (DOE) efforts to restore the environment and manage nuclear waste. This student edition was rewritten and edited by a team of high school students in order to make it "user-friendly" for high school students and the general public. The document focuses on the efforts of the…

  3. Effects of Soundscape on the Environmental Restoration in Urban Natural Environments

    Science.gov (United States)

    Zhang, Yuan; Kang, Jian; Kang, Joe

    2017-01-01

    Context: According to the attention restoration theory, directed attention is a limited physiological resource and is susceptible to fatigue by overuse. Natural environments are a healthy resource, which allows and promotes the restoration of individuals within it from their state of directed attention fatigue. This process is called the environmental restoration on individuals, and it is affected both positively and negatively by environmental factors. Aims: By considering the relationship among the three components of soundscape, that is, people, sound and the environment, this study aims to explore the effects of soundscape on the environmental restoration in urban natural environments. Materials and Methods: A field experiment was conducted with 70 participants (four groups) in an urban natural environment (Shenyang, China). Directed attention was first depleted with a 50-min ‘consumption’ phase, followed by a baseline measurement of attention level. Three groups then engaged in 40 min of restoration in the respective environments with similar visual surroundings but with different sounds present, after which attention levels were re-tested. The fourth group did not undergo restoration and was immediately re-tested. The difference between the two test scores, corrected for the practice effect, represents the attention restoration of individuals exposed to the respective environments. Statistical Analysis Used: An analysis of variance was performed, demonstrating that the differences between the mean values for each group were statistically significant [sig. = 0.027 (natural sounds group’ (8.4), ‘traffic sounds group’ (2.4) and ‘machine sounds group’ (−1.8). Conclusion: It can be concluded that (1) urban natural environments, with natural sounds, have a positive effect on the restoration of an individuals’ attention and (2) the presence of different types of sounds has significantly divergent effects on the environmental restoration. PMID

  4. Effects of Soundscape on the Environmental Restoration in Urban Natural Environments.

    Science.gov (United States)

    Zhang, Yuan; Kang, Jian; Kang, Joe

    2017-01-01

    According to the attention restoration theory, directed attention is a limited physiological resource and is susceptible to fatigue by overuse. Natural environments are a healthy resource, which allows and promotes the restoration of individuals within it from their state of directed attention fatigue. This process is called the environmental restoration on individuals, and it is affected both positively and negatively by environmental factors. By considering the relationship among the three components of soundscape, that is, people, sound and the environment, this study aims to explore the effects of soundscape on the environmental restoration in urban natural environments. A field experiment was conducted with 70 participants (four groups) in an urban natural environment (Shenyang, China). Directed attention was first depleted with a 50-min 'consumption' phase, followed by a baseline measurement of attention level. Three groups then engaged in 40 min of restoration in the respective environments with similar visual surroundings but with different sounds present, after which attention levels were re-tested. The fourth group did not undergo restoration and was immediately re-tested. The difference between the two test scores, corrected for the practice effect, represents the attention restoration of individuals exposed to the respective environments. An analysis of variance was performed, demonstrating that the differences between the mean values for each group were statistically significant [sig. = 0.027 (<0.050)]. The results showed that the mean values (confidence interval of 95%) of each group are as follows: 'natural sounds group' (8.4), 'traffic sounds group' (2.4) and 'machine sounds group' (-1.8). It can be concluded that (1) urban natural environments, with natural sounds, have a positive effect on the restoration of an individuals' attention and (2) the presence of different types of sounds has significantly divergent effects on the environmental

  5. Uranium mills and mines environmental restoration in Spain

    International Nuclear Information System (INIS)

    Perez Estevez, C.; Lozano Martinez, F.

    2000-01-01

    ENRESA and ENUSA have dismantled and restored a uranium mill in Andujar (Andalucia), a uranium facility based on open pit mining and plant in La Haba (Extremadura) and 19 old uranium mines in Andalucia and Extremadura. The Andujar Uranium Mill was operated from 1959 to 1981 and has been restorated between 1991 and 1994. The site included the tailings pile and the processing plant. The Haba Uranium Site included the Plant (operating from 1976 to 1999), four open-pit mines (operating from 1966 to 1990), the heaps leaching and the tailings dam and has been restorated between 1992 and 1997. The 19 abandoned uranium mines were developed by underground mining with the exception of two sites, which were operated by open pit mining. Mining operations started around 1959 and were shutdown in 1981. There was a great diversity among the mines, in terms of site conditions. Whereas in some sites there was little trace of the mining works, in other sites large excavations, mining debris piles, abandoned shafs and galeries and remaining surface structures and equipment were encountered. (author)

  6. Idaho National Engineering Laboratory (INEL) Environmental Restoration Program (ERP), Baseline Safety Analysis File (BSAF). Revision 1

    International Nuclear Information System (INIS)

    1994-01-01

    This document was prepared to take the place of a Safety Evaluation Report since the Baseline Safety Analysis File (BSAF)and associated Baseline Technical Safety Requirements (TSR) File do not meet the requirements of a complete safety analysis documentation. Its purpose is to present in summary form the background of how the BSAF and Baseline TSR originated and a description of the process by which it was produced and approved for use in the Environmental Restoration Program.The BSAF is a facility safety reference document for INEL environmental restoration activities including environmental remediation of inactive waste sites and decontamination and decommissioning (D ampersand D) of surplus facilities. The BSAF contains safety bases common to environmental restoration activities and guidelines for performing and documenting safety analysis. The common safety bases can be incorporated by reference into the safety analysis documentation prepared for individual environmental restoration activities with justification and any necessary revisions. The safety analysis guidelines in BSAF provide an accepted method for hazard analysis; analysis of normal, abnormal, and accident conditions; human factors analysis; and derivation of TSRS. The BSAF safety bases and guidelines are graded for environmental restoration activities

  7. Idaho National Engineering Laboratory (INEL) Environmental Restoration Program (ERP), Baseline Safety Analysis File (BSAF). Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-20

    This document was prepared to take the place of a Safety Evaluation Report since the Baseline Safety Analysis File (BSAF)and associated Baseline Technical Safety Requirements (TSR) File do not meet the requirements of a complete safety analysis documentation. Its purpose is to present in summary form the background of how the BSAF and Baseline TSR originated and a description of the process by which it was produced and approved for use in the Environmental Restoration Program.The BSAF is a facility safety reference document for INEL environmental restoration activities including environmental remediation of inactive waste sites and decontamination and decommissioning (D&D) of surplus facilities. The BSAF contains safety bases common to environmental restoration activities and guidelines for performing and documenting safety analysis. The common safety bases can be incorporated by reference into the safety analysis documentation prepared for individual environmental restoration activities with justification and any necessary revisions. The safety analysis guidelines in BSAF provide an accepted method for hazard analysis; analysis of normal, abnormal, and accident conditions; human factors analysis; and derivation of TSRS. The BSAF safety bases and guidelines are graded for environmental restoration activities.

  8. Technology development for nuclear fuel cycle waste treatment - Decontamination, decommissioning and environmental restoration (1)

    International Nuclear Information System (INIS)

    Lee, Byung Jik; Won, Hui Jun; Yoon, Ji Sup and others

    1997-12-01

    Through the project of D econtamination, decommissioning and environmental restoration technology development , the following were studied. 1. Development of decontamination and repair technology for nuclear fuel cycle facilities 2. Development of dismantling technology 3. Environmental remediation technology development. (author). 95 refs., 45 tabs., 163 figs

  9. Environmental restoration[1997 Scientific Report of the Belgian Nuclear Research Centre

    Energy Technology Data Exchange (ETDEWEB)

    Zeevaert, T.; Vanmaercke, H.

    1998-07-01

    The objectives of the research activities in the field of environmental restoration are: (1) to optimize and validate models for the impact assessment from environmental, radioactive contaminations, including waste disposal or discharges; (2) to support the policy of national authorities for public health and radioactive waste management. The main achievements for 1997 are given.

  10. 76 FR 13985 - Gulf Spill Restoration Planning; Public Scoping Meetings for the Programmatic Environmental...

    Science.gov (United States)

    2011-03-15

    ... National Oceanic and Atmospheric Administration RIN 0648-XA222 Gulf Spill Restoration Planning; Public Scoping Meetings for the Programmatic Environmental Impact Statement for the Deepwater Horizon Oil Spill... for the Programmatic Environmental Impact Statement for the Deepwater Horizon Oil Spill. There is a...

  11. Joint Coordinating Committee on environmental restoration and waste management (JCCEM) support, technology transfer, and special projects

    International Nuclear Information System (INIS)

    Edgar, D.E.

    1993-01-01

    Argonne National Laboratory (ANL) assisted in identifying and evaluating foreign technologies to meet EM needs; supported the evaluation, removal, and/or revision of barriers to international technology and information transfer/exchange; facilitated the integration and coordination of U.S. government international environmental restoration and waste management activities; and enhanced U.S. industry's competitiveness in the international environmental technology market

  12. Technology development for nuclear fuel cycle waste treatment - Decontamination, decommissioning and environmental restoration (1)

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Byung Jik; Won, Hui Jun; Yoon, Ji Sup [and others

    1997-12-01

    Through the project of 'Decontamination, decommissioning and environmental restoration technology development', the following were studied. 1. Development of decontamination and repair technology for nuclear fuel cycle facilities 2. Development of dismantling technology 3. Environmental remediation technology development. (author). 95 refs., 45 tabs., 163 figs.

  13. US - Former Soviet Union environmental restoration and waste management activities, March 1994

    International Nuclear Information System (INIS)

    1994-03-01

    The Peaceful Uses of Atomic Energy Agreement was signed between DOE and the Ministry of Atomic Energy for the Russian Federation and provides a mechanism for cooperation in research, development, and safe utilization of nuclear energy. Under the umbrella of this agreement, DOE and the former Ministry of Atomic Power and Industry signed a Memorandum of Cooperation in the areas of environmental restoration and waste management in September 1990. This document discusses the environmental situation, science and technology process, technical projects (separations, contaminant transport, waste treatment, environmental restoration), scientist exchanges, enhanced data transfer, the US-Russia industry partnership (conference, centers), and future actions

  14. ITEP: A survey of innovative environmental restoration technologies in the Netherlands and France

    International Nuclear Information System (INIS)

    Roberds, W.J.; Voss, C.F.; Hitchcock, S.A.

    1995-05-01

    The International Technology Exchange Program (ITEP) of the Department of Energy's (DOE's) Office of Environmental Management (EM) is responsible for promoting the import of innovative technologies to better address EM's needs and the export of US services into foreign markets to enhance US competitiveness. Under this program, potentially innovative environmental restoration technologies, either commercially available or under development in the Netherlands and France, were identified, described, and evaluated. It was found that 12 innovative environmental restoration technologies, which are either commercially available or under development in the Netherlands and France, may have some benefit for the DOE EM program and should be considered for transfer to the United States

  15. Environmental restoration/waste management-applied technology semiannual report, January--June 1992

    International Nuclear Information System (INIS)

    Adamson, M.; Kline-Simon, K.

    1992-01-01

    This is the first issue from the Lawrence Livermore National Laboratory of The Environmental Restoration/Waste Management-Applied Technology (ER/WM-AT) Semiannual Report, a continuation of the Advanced Processing Technology (APT) Semiannual Report. The name change reflects the consolidation of the APT Program with the Environmental Restoration and Waste Management Program to form the Environmental Restoration/Waste Management-Applied Technology (ER/WM-AT) Program. The Livermore site mirrors, on a small scale, many of the environmental and waste management problems of the DOE Complex. The six articles in this issue cover incineration- alternative technologies, process development for waste minimization, the proposed Mixed Waste Management Facility, dynamic underground stripping, electrical resistance tomography, and Raman spectroscopy for remote characterization of underground tanks

  16. Development of educational programs for environmental restoration/waste management at two Department of Energy sites

    International Nuclear Information System (INIS)

    Harrison, R.J.; Toth, W.J.; Smith, T.H.

    1991-01-01

    Availability of appropriately educated personnel is perhaps the greatest obstacle faced by the nation in addressing its waste management and environmental restoration activities. The US Department of Energy (DOE) Idaho National Engineering Laboratory (INEL) and the DOE Grand Junction, Colorado, Projects Office (GJPO) have developed two educational degree programs that respond to the human resource needs of the environmental restoration/waste management effort in ways that reflect the programmatic and cultural diversity at the two sites. The INEL has worked with the University of Idaho and Idaho States University to develop a set of master's degree programs focusing on waste management and environmental restoration. GJPO has developed an associate degree program and is developing a baccalaureate program in environmental restoration with Mesa State College. The development of these two programs was coordinated through the INEL University Relations Committee. They were conceived as parts of an overall effort to provide the human resources for environmental restoration and waste management. The background, need, and development of these two programs are presented, as well as information on associated industry parternships, employee scholarship programs, and plans for integration and articulation of curricula. 3 refs

  17. Restoring public trust while tearing down site in rural Ohio

    International Nuclear Information System (INIS)

    Schneider, Jerry; Wagner, Jeffrey; Connell, Judy

    2007-01-01

    establishing a public-participation program that emphasized a shared-decision making process and abandoned the government's traditional, non-participatory 'Decide, Announce, Defend' approach. Fernald's program became a model within the DOE complex for effective public participation. Fluor led the formation of the first DOE site-specific advisory board dedicated to remediation and closure. The board was successful at building consensus on critical issues affecting long-term site remediation, such as cleanup levels, waste disposal and final land use. Fluor created innovative public outreach tools, such as 'Cleanopoly', based on the Monopoly game, to help illustrate complex concepts, including risk levels, remediation techniques, and associated costs. These innovative tools helped DOE and Fluor gain stakeholder consensus on all cleanup plans. To commemorate the outstanding commitment of Fernald stakeholders to this massive environmental-restoration project, Fluor donated $20,000 to build the Weapons to Wetlands Grove overlooking the former 136-acre production area. The grove contains 24 trees, each dedicated to '[a] leader(s) behind the Fernald cleanup'. Over the years, Fluor, through the Fluor Foundation, also invested in educational and humanitarian projects, contributing nearly $2 million to communities in southwestern Ohio, Kentucky and Indiana. Further, to help offset the economic impact of the site's closing to the community, DOE and Fluor promoted economic development in the region by donating excess equipment and property to local schools and townships. This paper discusses the details of the public-involvement program - from inception through maturity - and presents some lessons learned that can be applied to other similar projects. (authors)

  18. Report to Congress on the Indemnification of Contractors Performing Environmental Restoration

    Science.gov (United States)

    1993-11-01

    enviromental restoration contractors, but tion, and Liability Act, as amended by the Superfund even more provide immunity. This means that the...DoD environmental restoration contracting. 2 23I I [Chapter 3: Adequacy of Competition g ENDNOTES: ENDNO07S (Conenud): SComprehensive Enviromental ...stating that pesticide wastes in it. The resulting mixture leaked into I ENSR had a duty to complete closure of the site in a the environment for

  19. Environmental restoration. Stabilization of mining tailing and uranium mineral

    International Nuclear Information System (INIS)

    Perez, C.; Carboneras, P.

    1998-01-01

    ENRESA has dismantling a uranium mill facility and restored the site since 1991 to 1994. Since 1997, 19 uranium mines are being re mediated. The Andujar uranium mill was operational since 1959 to 1981. The remedial action plan performed in the Andujar mill site involved stabilizing and consolidating the uranium mill tailings and contaminated materials in place. Mill equipment, building and process facilities have been dismantled and demolished and the resulting metal wastes and debris have been placed in the pile. The tailings mass has been reshape by flattening the side slopes and cover system was placed over the pile. The uranium mines are located in Extremadura and Andalucia. There is a great diversity among the mines in terms of the magnitude of the disturbed areas by mining work and the effects on the environment, including excavations, waste rock piles, abandoned shafts and galleries, and remaining of surface structures and facilities. Remedial measures include the sealing for shafts and openings to prevent collapse of mine workings and subsidence, the dewatering and the open-pit excavation and the treatment of the contaminated waters, the disposal and the stabilization of mining debris piles to prevent dispersion, the placement of a re vegetated cover over the piles to control dust and erosion, and the restoration of the site. (Author)

  20. Integrating natural resource damage assessment and environmental restoration activities at DOE facilities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-10-01

    Environmental restoration activities are currently under way at many U.S. Department of Energy (DOE) sites under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. DOE is the CERCLA lead response agency for these activities. Section 120 of CERCLA also could subject DOE to liability for natural resource damages resulting from hazardous substance releases at its sites. A Natural Resource Damage Assessment (NRDA) process is used to determine whether natural resources have been injured and to calculate compensatory monetary damages to be used to restore the natural resources. In addition to restoration costs, damages may include costs of conducting the damage assessment and compensation for interim losses of natural resource services that occur before resource restoration is complete. Natural resource damages represent a potentially significant source of additional monetary claims under CERCLA, but are not well known or understood by many DOE staff and contractors involved in environmental restoration activities. This report describes the requirements and procedures of NRDA in order to make DOE managers aware of what the process is designed to do. It also explains how to integrate the NRDA and CERCLA Remedial Investigation/Feasibility Study processes, showing how the technical and cost analysis concepts of NRDA can be borrowed at strategic points in the CERCLA process to improve decisionmaking and more quickly restore natural resource services at the lowest total cost to the public.

  1. Integrating Natural Resource Damage Assessment and environmental restoration activities at DOE facilities

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    Environmental restoration activities are currently under way at many US Department of Energy (DOE) sites under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). DOE is the CERCLA lead response agency for these activities. Section 120 of CERCLA also could subject DOE to liability for natural resource damages resulting from hazardous substance releases at its sites. A Natural Resource Damage Assessment (NRDA) process is used to determine whether natural resources have been injured and to calculate compensatory monetary damages to be used to restore the natural resources. In addition to restoration costs, damages may include costs of conducting the damage assessment and compensation for interim losses of natural resource services that occur before resource restoration is complete. Natural resource damages represent a potentially significant source of additional monetary claims under CERCLA, but are not well known or understood by many DOE staff and contractors involved in environmental restoration activities. This report describes the requirements and procedures of NRDA in order to make DOE managers aware of what the process is designed to do. It also explains how to integrate the NRDA and CERCLA Remedial Investigation/Feasibility Study processes, showing how the technical and cost analysis concepts of NRDA can be borrowed at strategic points in the CERCLA process to improve decisionmaking and more quickly restore natural resource services at the lowest total cost to the public.

  2. The art of implosions has impacted the success of three decontamination and decommissioning projects at Fernald

    International Nuclear Information System (INIS)

    Borgman, T.D.

    1997-01-01

    The Department of Energy (DOE) at the Fernald Environmental Management Project (FEMP), near Cincinnati, Ohio, has successfully impacted the safety, cost and schedule goals of the Decontamination and Dismantling (D ampersand D) Program by using the art of implosions. An implosion is the act of bringing a structure down in a well planned and directed manner using explosive materials. Three major structures in three separate projects were imploded using this well known commercial technology. Safety is, and will always be, the major consideration with each of the projects. As each project succeeded another, the work process used new and improved methods to lower the risk to the environment, provide a safer workplace by reducing the exposure of high risk work and reducing the spread of lead, asbestos and radioactive materials. The time frame for dismantlement of the steel structures was greatly improved, thus reducing the total project cost. The lessons learned were incorporated from one project to another, to continually improve the work process. A number of alternatives were considered for the removal of the structures, seven, four and three stories in height. The subcontractor and its demolition sub-tier contractor worked in a fixed price lump sum contract environment. While skeptical at first, the subcontractor realized the benefits of the technology, a win-win situation for all participants. The overall planning of each of the events was tied to the needs of the client (DOE), the stakeholders and the community surrounding the site, and the continuing progress at the Fernald site. The recording and application of several key lessons learned in the sequence of implosions, will be the key issues of interest in this paper. Each project offered interesting opportunities for contingency planning, coordination, safety culture adjustments, and high regard for the protection of surrounding structures

  3. The art of implosions has impacted the success of three decontamination and decommissioning projects at Fernald

    Energy Technology Data Exchange (ETDEWEB)

    Borgman, T.D.

    1997-12-01

    The Department of Energy (DOE) at the Fernald Environmental Management Project (FEMP), near Cincinnati, Ohio, has successfully impacted the safety, cost and schedule goals of the Decontamination and Dismantling (D&D) Program by using the art of implosions. An implosion is the act of bringing a structure down in a well planned and directed manner using explosive materials. Three major structures in three separate projects were imploded using this well known commercial technology. Safety is, and will always be, the major consideration with each of the projects. As each project succeeded another, the work process used new and improved methods to lower the risk to the environment, provide a safer workplace by reducing the exposure of high risk work and reducing the spread of lead, asbestos and radioactive materials. The time frame for dismantlement of the steel structures was greatly improved, thus reducing the total project cost. The lessons learned were incorporated from one project to another, to continually improve the work process. A number of alternatives were considered for the removal of the structures, seven, four and three stories in height. The subcontractor and its demolition sub-tier contractor worked in a fixed price lump sum contract environment. While skeptical at first, the subcontractor realized the benefits of the technology, a win-win situation for all participants. The overall planning of each of the events was tied to the needs of the client (DOE), the stakeholders and the community surrounding the site, and the continuing progress at the Fernald site. The recording and application of several key lessons learned in the sequence of implosions, will be the key issues of interest in this paper. Each project offered interesting opportunities for contingency planning, coordination, safety culture adjustments, and high regard for the protection of surrounding structures.

  4. U.S. Army Environmental Restoration Programs Guidance Manual

    Science.gov (United States)

    1998-04-01

    Program ( ECAP ), DSERTS, DSMOA, and FUDS. • Current environmental news and environmental, legislative and regulatory alerts. • Lists of training...DPG DQO DSERTS DSMOA DUSD(ES) EA EBS ECAP ECOP EE/CA EFARS EIS EPR ER,A ERA ERP FACNET FAD FAR FARA FASA FFA FFP FONSI FORSCOM...cancer risk for each additional mg /kg body weight per day of exposure. Potentially Responsible Party - Current and former owners or operators and

  5. Annual report of the Environmental Restoration Monitoring and Assessment Program at Oak Ridge National Laboratory for FY 1992. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Clapp, R.B. [ed.

    1992-09-01

    This report summarizes the salient features of the annual efforts of the investigations and monitoring, conducted to support the Environmental Restoration (ER) Program at Oak Ridge National Laboratory (ORNL). The results presented can be used to develop a conceptual understanding of the key contaminants and the sources, fluxes, and processes affecting their distribution and movement. This information forms a basis for prioritizing sites and for selecting, implementing, and evaluating remedial actions. Groundwater, soils, sediments, and surface water monitoring results are described.

  6. Laboratory interface in support of Environmental Restoration Programs

    International Nuclear Information System (INIS)

    Pardue, G.J. Jr.

    1994-01-01

    A vital part of quality environmental data resides in the communication between the project and the analytical laboratory. It is essential that the project clearly identify its objectives to the laboratory and that the laboratory understands the scope and limitations of the analytical process. Successful completion of an environmental project must include an aggressive program between project managers and subcontracted Lyrical laboratories. All to often, individuals and organizations tend to deflect errors and failures observed in environmental toward open-quotes the other guyclose quotes. The engineering firm will blame the laboratory, the laboratory will blame the field operation, the field operation will blame the engineering, and everyone will blame the customer for not understanding the true variables in the environmental arena. It is the contention of the authors, that the majority of failures derive from a lack of communication and misunderstanding. Several initiatives can be taken to improve communication and understanding between the various pieces of the environmental data quality puzzle. This presentation attempts to outline mechanisms to improve communication between the environmental project and the analytical laboratory with the intent of continuous quality improvement. Concepts include: project specific laboratory statements of work which focus on project and program requirements; project specific analytical laboratory readiness reviews (project kick-off meetings); laboratory team workshops; project/program performance tracking and self assessment and promotion of team success

  7. Savannah River Site`s Site Specific Plan. Environmental restoration and waste management, fiscal year 1992

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

  8. Environmental restoration issues relevant to lands that support native populations

    International Nuclear Information System (INIS)

    Simon, S.L.

    1999-01-01

    Islands and other remote locations that support indigenous (native) populations require special considerations in the setting of criteria for maximum allowable radioactivity contamination of the environment. The criteria can differ from those applicable to Western continental urban settings because of particular attributes related to lifestyle or environment. Conventionally, guidelines for land cleanup are derived by using a pathway model and descriptions of conventional intake patterns to calculate backwards from an acceptable dose or risk. However, pathways of possible exposure differ in characteristics and relative importance for indigenous populations, and conventional exposure-assessment models need considerable revision for them. More primitive lifestyles usually imply a need for stricter standards. In contrast, somewhat higher risk might not produce any excess cancer incidence if the population is small enough, as is often the case for islanders or other indigenous populations. This paper discusses various factors peculiar to indigenous populations that require consideration when criteria for restoration of contaminated environments are being determined. (author)

  9. 200 Areas Remedial Investigation/Feasibility Study Implementation Plan - Environmental Restoration Program

    International Nuclear Information System (INIS)

    Knepp, A. J.

    1999-01-01

    The 200 Areas Remedial Investigation/Feasibility Study Implementation Plan - Environmental Restoration Program (Implementation Plan) addresses approximately 700 soil waste sites (and associated structures such as pipelines) resulting from the discharge of liquids and solids from processing facilities to the ground (e.g., ponds, ditches, cribs,burial grounds) in the 200 Areas and assigned to the Environmental Restoration Program. The Implementation Plan outlines the framework for implementing assessment activities in the 200 Areas to ensure consistency in documentation, level of characterization, and decision making. The Implementation Plan also consolidates background information and other typical work plan materials, to serve as a single referenceable source for this type of information

  10. Environmental impacts of mining: monitoring, restoration and control

    Energy Technology Data Exchange (ETDEWEB)

    Sengupta, M.

    1993-01-01

    Contains 12 chapters with the following titles: mining and the environment; surface coal mining with reclamation; reclamation and revegetation of mined land; the acid mine drainage problem from coal mines; acid rock drainage and metal migration; hydrologic impact; erosion and sediment control; wetlands; blasting; mining subsidence; postmining land use; environmental effects of gold heap-leaching operations.

  11. Site specific plan. [Environmental Restoration and Waste Management, Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Hutchison, J.; Jernigan, G.

    1989-12-01

    The Environmental Restoration and Waste Management Five-Year Plan (FYP) covers the period for FY 1989 through FY 1995. The plan establishes a Department of Energy -- Headquarters (DOE-HQ) agenda for cleanup and compliance against which overall progress can be measured. The FYP covers three areas: Corrective Activities, Environmental Restoration, and Waste Management Operations. Corrective Activities are those activities necessary to bring active or standby facilities into compliance with local, state, and federal environmental regulations. Environmental restoration activities include the assessment and cleanup of surplus facilities and inactive waste sites. Waste management operations includes the treatment, storage, and disposal of wastes which are generated as a result of ongoing operations. This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show how environmental restoration and waste management activities that were identified during the preparation of the FYP will be implemented, tracked, and reported. The SSP describes DOE Savannah River (DOE-SR) and operating contractor, Westinghouse Savannah River Company (WSRC), organizations that are responsible, for undertaking the activities identified in this plan. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. 8 refs., 46 figs., 23 tabs.

  12. Restoration of mires - the question of ethics, aesthetics and environmental awareness. 2. part

    International Nuclear Information System (INIS)

    Lode, Elve

    1999-01-01

    Restoration of mires is an issue of environmental awareness. This part of the paper has been divided into two sections: (i) description of international scientific experiments, and (ii) description of Estonian practice to restore or reclaim old peat cuttings. The presentations of the International Symposium on Peatland Restoration and Reclamation held in US in July 1998, and the IPS Jubilee Conference in Finland in September 1998 review the most common international scientific directions and practical results concerning peatland restoration and reclamation. The recolonising of the Sphagnum species and decreasing of gas emissions in old peat cuttings are a popular scientific task in the peatland restoration of today. In Estonia the area of old peat cuttings is currently about 3,000 ha to probably increase by 18,000 ha (Ramst, 1997). This means that Estonia should have its own program for sustainable peatland management, restoration and reclamation included. As an example of sustainable nature management the Summary considers the development of the US Surface Mining Control and Reclamation Act of 1977. This part is illustrated with photos demonstrating this law in practice in the Pennsylvania Coal Mining Region in summer 1997. Although regional institutions have been given priority to using mineral resources, the State should also be responsible for the restoration and reclamation of a exhausted mining area. (author)

  13. Department of Energy Defense Programs Environmental Restoration Program update

    International Nuclear Information System (INIS)

    Lehr, J.C.; Eyman, L.D.; Thompson, W.W. Jr.

    1989-01-01

    Federal facilities are under increasing pressure to remediate inactive hazardous waste sites and associated off-site areas. The Superfund Amendments and Reauthorization Act federal facilities provision requires that the Environmental Protection Agency establish a public docket to list all federal sites contaminated by hazardous wastes or substances and to monitor the progress of investigations and cleanups against an established schedule. In addition, the Resource Conservation and Recovery Act requires that operating permits for hazardous waste treatment, storage, and disposal facilities be issued only upon binding agreements that identify specific schedules for corrective action for all hazardous waste releases that have or are occurring at the facility. Defense Programs (DP) must make remedial actions integral to its mission. Environmental cleanups are given increased emphasis with the new regulations/laws providing the right to private citizens and the states to sue to enforce these statutes and schedule commitments. 1 fig., 2 tabs

  14. Environmental restoration and waste management site-specific plan for Richland Operations Office

    International Nuclear Information System (INIS)

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs

  15. Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

  16. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    1991-09-01

    This site management for the Environmental Restoration (ER) Program implements the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) (EPA 1990), also known as an Interagency Agreement (IAG), hereafter referred to as ''the Agreement.'' The Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC), hereafter known as ''the Parties,'' entered into this Agreement for the purpose of coordinating remediation activities undertaken on the ORR to comply with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) as amended by the Superfund Amendments, the Resource Conservation and Recovery Act (RCRA), and the National Environmental Policy Act (NEPA). 7 refs., 17 figs

  17. 78 FR 16294 - Draft Environmental Impact Statement for Restoration of the Mariposa Grove of Giant Sequoias...

    Science.gov (United States)

    2013-03-14

    ... Environmental Impact Statement for Restoration of the Mariposa Grove of Giant Sequoias, Yosemite National Park, Madera, and Mariposa Counties, CA AGENCY: National Park Service, Interior. ACTION: Notice of availability... the Mariposa Grove of giant sequoias in Yosemite National Park. This Draft EIS presents three...

  18. The Environmental Restoration Contractor Publication and Graphic Services style and resources guide. Revision 1

    International Nuclear Information System (INIS)

    Forbes, C.J.

    1997-06-01

    The Environmental Restoration Contractor (ERC) Publication and Graphic Services (P ampersand GS) Style and Resources Guide (Rev. 1) presents instructions, uniform conventions, guidelines, specifications, requirements, and detailed process steps that will increase efficiency and reduce costs for ERC organizations, including subcontractors. This Guide also identifies P ampersand GS capabilities that can be provided to support ERC multimedia needs

  19. Environmental restoration and remediation technical data management plan

    International Nuclear Information System (INIS)

    Key, K.T.; Fox, R.D.

    1994-02-01

    The tasks performed in the Remedial Investigation/Feasibility Study (RI/FS) work plan for each Hanford Site operable unit must meet the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al 1992). An extensive amount of data will be generated in the evaluation and remediation of hazardous waste sites at the Site. The data must be of sufficient quality, as they will be used to evaluate the need, select the method(s), and support the full remediation of the waste sites as stipulated in the Tri-Party Agreement. In particular, a data management plan (DMP) is to be included in an RI/FS work plan for managing the technical data obtained during the characterization of an operable unit, as well as other data related to the study of the operable unit. Resource Conservation and Recovery Act of 1976 (RCRA) sites are involved in the operable unit. Thus, the data management activities for the operable unit should be applied consistently to RCRA sites in the operable unit as well. This DMP provides common direction for managing-the environmental technical data of all defined operable units at the Hanford Site during the RI/FS activities. Details specific to an operable unit will be included in the actual work plan of that operable unit

  20. Life Cycle Analysis for Treatment and Disposal of PCB Waste at Ashtabula and Fernald

    International Nuclear Information System (INIS)

    Morris, M.I.

    2001-01-01

    This report presents the use of the life cycle analysis (LCA) system developed at Oak Ridge National Laboratory (ORNL) to assist two U.S. Department of Energy (DOE) sites in Ohio--the Ashtabula Environmental Management Project near Cleveland and the Fernald Environmental Management Project near Cincinnati--in assessing treatment and disposal options for polychlorinated biphenyl (PCB)-contaminated low-level radioactive waste (LLW) and mixed waste. We will examine, first, how the LCA process works, then look briefly at the LCA system's ''toolbox,'' and finally, see how the process was applied in analyzing the options available in Ohio. As DOE nuclear weapons facilities carry out planned decontamination and decommissioning (D and D) activities for site closure and progressively package waste streams, remove buildings, and clean up other structures that have served as temporary waste storage locations, it becomes paramount for each waste stream to have a prescribed and proven outlet for disposition. Some of the most problematic waste streams throughout the DOE complex are PCB low-level radioactive wastes (liquid and solid) and PCB low-level Resource Conservation and Recovery Act (RCRA) liquid and solid wastes. Several DOE Ohio Field Office (OH) sites have PCB disposition needs that could have an impact on the critical path of the decommissioning work of these closure sites. The Ashtabula Environmental Management Project (AEMP), an OH closure site, has an urgent problem with disposition of soils contaminated by PCB and low-level waste at the edge of the site. The Fernald Environmental Management Project (FEMP), another OH closure site, has difficulties in timely disposition of its PCB-low-level sludges and its PCB low-level RCRA sludges in order to avoid impacting the critical path of its D and D activities. Evaluation of options for these waste streams is the subject of this report. In the past a few alternatives for disposition of PCB low-level waste and PCB low

  1. Life Cycle Analysis for Treatment and Disposal of PCB Waste at Ashtabula and Fernald

    Energy Technology Data Exchange (ETDEWEB)

    Morris, M.I.

    2001-01-11

    This report presents the use of the life cycle analysis (LCA) system developed at Oak Ridge National Laboratory (ORNL) to assist two U.S. Department of Energy (DOE) sites in Ohio--the Ashtabula Environmental Management Project near Cleveland and the Fernald Environmental Management Project near Cincinnati--in assessing treatment and disposal options for polychlorinated biphenyl (PCB)-contaminated low-level radioactive waste (LLW) and mixed waste. We will examine, first, how the LCA process works, then look briefly at the LCA system's ''toolbox,'' and finally, see how the process was applied in analyzing the options available in Ohio. As DOE nuclear weapons facilities carry out planned decontamination and decommissioning (D&D) activities for site closure and progressively package waste streams, remove buildings, and clean up other structures that have served as temporary waste storage locations, it becomes paramount for each waste stream to have a prescribed and proven outlet for disposition. Some of the most problematic waste streams throughout the DOE complex are PCB low-level radioactive wastes (liquid and solid) and PCB low-level Resource Conservation and Recovery Act (RCRA) liquid and solid wastes. Several DOE Ohio Field Office (OH) sites have PCB disposition needs that could have an impact on the critical path of the decommissioning work of these closure sites. The Ashtabula Environmental Management Project (AEMP), an OH closure site, has an urgent problem with disposition of soils contaminated by PCB and low-level waste at the edge of the site. The Fernald Environmental Management Project (FEMP), another OH closure site, has difficulties in timely disposition of its PCB-low-level sludges and its PCB low-level RCRA sludges in order to avoid impacting the critical path of its D&D activities. Evaluation of options for these waste streams is the subject of this report. In the past a few alternatives for disposition of PCB low-level waste

  2. Environmental restoration: Integrating hydraulic control of groundwater, innovative contaminant removal technologies and wetlands restoration--A case study at SRS

    International Nuclear Information System (INIS)

    Lewis, C.M.; Serkiz, S.M.; Adams, J.; Welty, M.

    1992-01-01

    The groundwater remediation program at the F and H Seepage Basins, Savannah River Sits (SRS) is a case study of the integration of various environmental restoration technologies at a single waste site. Hydraulic control measures are being designed to mitigate the discharge of groundwater plumes to surface water. One of the primary constituents of the plumes is tritium. An extraction and reinjection scenario is being designed to keep the tritium in circulation in the shallow groundwater, until it can naturally decay. This will be accomplished by extracting groundwater downgradient of the waste sites, treatment, and reinjection of the tritiated water into the water table upgradient of the basins. Innovative in-situ technologies, including electrolytic migration, are being field tested at the site to augment the pump-treat-reinject system. The in-situ technologies target removal of contaminants which are relatively immobile, yet represent long term risks to human health and the environment. Wetland restoration is an integral part of the F and H remediation program. Both in-situ treatment of the groundwater discharging the wetlands to adjust the pH, and replacement of water loss due to the groundwater extraction program ar being considered. Toxicity studies indicate that drought and the effects of low pH groundwater discharge have been factors in observed tree mortality in wetlands near the waste sites

  3. Environmental awareness and public support for protecting and restoring Puget sound.

    Science.gov (United States)

    Safford, Thomas G; Norman, Karma C; Henly, Megan; Mills, Katherine E; Levin, Phillip S

    2014-04-01

    In an effort to garner consensus around environmental programs, practitioners have attempted to increase awareness about environmental threats and demonstrate the need for action. Nonetheless, how beliefs about the scope and severity of different types of environmental concerns shape support for management interventions are less clear. Using data from a telephone survey of residents of the Puget Sound region of Washington, we investigate how perceptions of the severity of different coastal environmental problems, along with other social factors, affect attitudes about policy options. We find that self-assessed environmental understanding and views about the seriousness of pollution, habitat loss, and salmon declines are only weakly related. Among survey respondents, women, young people, and those who believe pollution threatens Puget Sound are more likely to support policy measures such as increased enforcement and spending on restoration. Conversely, self-identified Republicans and individuals who view current regulations as ineffective tend to oppose governmental actions aimed at protecting and restoring Puget Sound. Support for one policy measure-tax credits for environmentally-friendly business practices-is not significantly affected by political party affiliation. These findings demonstrate that environmental awareness can influence public support for environmental policy tools. However, the nature of particular management interventions and other social forces can have important mitigating effects and need to be considered by practitioners attempting to develop environment-related social indicators and generate consensus around the need for action to address environmental problems.

  4. 78 FR 66380 - Final Environmental Impact Statement for the Restoration of the Mariposa Grove of Giant Sequoias...

    Science.gov (United States)

    2013-11-05

    ... Environmental Impact Statement for the Restoration of the Mariposa Grove of Giant Sequoias, Yosemite National Park, Mariposa County, California AGENCY: National Park Service, Interior. ACTION: Notice of... Environmental Impact Statement for Restoration of the Mariposa Grove of Giant Sequoias (Mariposa Grove FEIS...

  5. 75 FR 41881 - Notice of Intent To Prepare a Shoreline Restoration and Management Plan/Environmental Impact...

    Science.gov (United States)

    2010-07-19

    ... National Park Service Notice of Intent To Prepare a Shoreline Restoration and Management Plan/Environmental... Service (NPS) is announcing its intent to prepare an environmental impact statement (EIS) for a Shoreline... restoration activities that are to be achieved and maintained for the shoreline over the next 15 to 20 years...

  6. Photosynthetic performance of restored and natural mangroves under different environmental constraints

    International Nuclear Information System (INIS)

    Rovai, André Scarlate; Barufi, José Bonomi; Pagliosa, Paulo Roberto; Scherner, Fernando; Torres, Moacir Aluísio; Horta, Paulo Antunes

    2013-01-01

    We hypothesized that the photosynthetic performance of mangrove stands restored by the single planting of mangroves species would be lowered due to residual stressors. The photosynthetic parameters of the vegetation of three planted mangrove stands, each with a different disturbance history, were compared to reference sites and correlated with edaphic environmental variables. A permutational analysis of variance showed significant interaction when the factors were compared, indicating that the photosynthetic parameters of the restoration areas differed from the reference sites. A univariate analysis of variance showed that all the photosynthetic parameters differed between sites and treatments, except for photosynthetic efficiency (α ETR ). The combination of environmental variables that best explained the variations observed in the photosynthetic performance indicators were Cu, Pb and elevation disruptions. Fluorescence techniques proved efficient in revealing important physiological differences, representing a powerful tool for rapid analysis of the effectiveness of initiatives aimed at restoring coastal environments. -- Highlights: •Photosynthetic efficiency of natural and restored mangroves are compared. •Natural stands present higher photosynthetic performance. •Photosynthetic performance of mangroves is reduced due to Cu and Pb contamination. •Chlorophyll a fluorescence is a useful indicator to assess short-term restoration. -- Photosynthetic performance of mangroves is reduced due to Cu and Pb contamination

  7. Potential CERCLA reauthorization issues relevant to US DOE's Environmental Restoration Program

    International Nuclear Information System (INIS)

    Siegel, M.R.; McKinney, M.D.; Jaksch, J.A.; Dailey, R.L.

    1993-02-01

    The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) is currently scheduled to be reauthorized in 1994. The US Department of Energy (DOE) has a significant stake in CERCLA reauthorization. CERCLA, along with its implementing regulation, the National Contingency Plan (NCP), is the principal legal authority governing DOE's environmental restoration program. The manner in which CERCLA-related issues are identified, evaluated, and dispatched may have a substantial impact on DOE's ability to conduct its environmental restoration program. A number of issues that impact DOE's environmental restoration program could be addressed through CERCLA reauthorization. These issues include the need to (1) address how the National Environmental Policy Act (NEPA) should be integrated into DOE CERCLA actions, (2) facilitate the streamlining of the Superfund process at DOE sites, (3) address the conflicts between the requirements of CERCLA and the Resource Conservation and Recovery Act (RCRA) that are especially relevant to DOE, (4) examine the criteria for waiving applicable or relevant and appropriate requirements (ARARs) at DOE sites, and (5) delineate the appropriate use of institutional controls at DOE sites

  8. Westinghouse Savannah River Site Supplier Environmental Restoration and Waste Management Information Exchange Forum

    International Nuclear Information System (INIS)

    Sturm, H.F. Jr.; Hottel, R.E.; Christoper, N.

    1994-01-01

    The Savannah River Site conducted its first Supplier Information Exchange in September 1993. The intent of the conference was to inform potential suppliers of the Savannah River Sites mission and research and development program objectives in the areas of environmental restoration and waste management, and to solicit proposals for innovative research in those areas. Major areas addressed were Solid Waste, Environmental Restoration, Environmental Monitoring, Transition/Decontamination and Decommissioning, and the Savannah River Technology Center. A total of 1062 proposals were received addressing the 89 abstracts presented. This paper will describe the forum the process for solicitation, the process for proposal review and selection, and review the overall results and benefits to Savannah River

  9. Environmental enrichment restores cognitive deficits induced by experimental childhood meningitis.

    Science.gov (United States)

    Barichello, Tatiana; Fagundes, Glauco D; Generoso, Jaqueline S; Dagostin, Caroline S; Simões, Lutiana R; Vilela, Márcia C; Comim, Clarissa M; Petronilho, Fabricia; Quevedo, João; Teixeira, Antonio L

    2014-01-01

    To evaluate the influence of environmental enrichment (EE) on memory, cytokines, and brain-derived neurotrophic factor (BDNF) in the brain of adult rats subjected to experimental pneumococcal meningitis during infancy. On postnatal day 11, the animals received either artificial cerebrospinal fluid (CSF) or Streptococcus pneumoniae suspension intracisternally at 1 × 10(6) CFU/mL and remained with their mothers until age 21 days. Animals were divided into the following groups: control, control + EE, meningitis, and meningitis + EE. EE began at 21 days and continued until 60 days of age (adulthood). EE consisted of a large cage with three floors, ramps, running wheels, and objects of different shapes and textures. At 60 days, animals were randomized and subjected to habituation to the open-field task and the step-down inhibitory avoidance task. After the tasks, the hippocampus and CSF were isolated for analysis. The meningitis group showed no difference in performance between training and test sessions of the open-field task, suggesting habituation memory impairment; in the meningitis + EE group, performance was significantly different, showing preservation of habituation memory. In the step-down inhibitory avoidance task, there were no differences in behavior between training and test sessions in the meningitis group, showing aversive memory impairment; conversely, differences were observed in the meningitis + EE group, demonstrating aversive memory preservation. In the two meningitis groups, IL-4, IL-10, and BDNF levels were increased in the hippocampus, and BDNF levels in the CSF. The data presented suggest that EE, a non-invasive therapy, enables recovery from memory deficits caused by neonatal meningitis.

  10. Robotics for environmental restoration and waste management (ER and WM)

    International Nuclear Information System (INIS)

    Yook, H.

    1991-01-01

    The Department of Energy (DOE) is making a concerted effort to clean up soils, groundwater, and facilities that have been contaminated with radioactive and hazardous substances. Environmental cleanup work and waste management operations at DOE sites involve the storage, monitoring, handling, processing, and disposal of these substances. With current methods this work is often slow and expensive because both personnel and the environment must be protected from the hazards. The ER and WM Robotics Technology Development Program (RTDP) sponsors applied research and development for the application of robotics to ER and WM needs at the DOE sites. Potential benefits are the following: (1) reduced worker exposure and increased safety through remote operation and control of equipment; (2) increased speed and productivity for ER and WM operations through enhanced capabilities and automation; and (3) reduced life-cycle costs through shorter performance times. A needs-based 5-year plan for RTDP was completed in September 1990. The Plan includes technology development in five application areas at DOE sites. These areas are as follows: (1) waste storage tanks - robotic systems to support waste characterization and retrieval and tank decontamination; (2) buried waste retrieval - robotic systems for support characterization, excavation, retrieval, handling, and packaging of buried wastes; (3) waste minimization - automated process and robotics systems for production operations that can reduce generation of wastes; (4) contaminant analysis automation - remote automated sample handling and analysis to reduce worker exposure, increase productivity, and reduce costs; and (5) decontamination and decommissioning - robotic systems for remote operations to remove equipment and decontamination facilities. Four demonstrations of potential robotics applications to ER and WM needs were performed in FY 1990

  11. Assessing data quality for a federal environmental restoration project: Rationalizing the requirements of multiple clients

    International Nuclear Information System (INIS)

    Kiszka, V.R.; Carlsen, T.M.

    1994-07-01

    Most environmental restoration projects at federal facilities face the difficult task of melding the quality assurance (QA) requirements of multiple clients, as well as dealing with historical data that are often of unknown quality. At Lawrence Livermore National Laboratory (LLNL), we have successfully integrated the requirements of our multiple clients by carefully developing a QA program that efficiently meets our clients' needs. The Site 300 Experimental Test Site is operated by LLNL in support of its national defense program. The responsibility for conducting environmental contaminant investigations and restoration at Site 300 is vested in the Site 300 Environmental Restoration Project (Site 300 ERP) of LLNL's Environmental Restoration Division. LLNL Site 300 ERP must comply with the QA requirements of several clients, which include: the LLNL Environmental Protection Department, the DOE, the US Environmental Protection Agency-Region IX (EPA), the California Regional Water Quality Control Board -- Central Valley Region, and the California Department of Toxic Substances Control. This comprehensive QA program was used to determine the acceptability of historical data. The Site 300 ERP began soil and ground water investigations in 1982. However, we did not begin receiving analytical quality assurance/quality control (QA/QC) data until 1989; therefore, the pre-1989 data that were collected are of unknown quality. The US EPA QAMS-005/80 defines data quality as the totality of features and characteristics of data that bears on its ability to satisfy a given purpose. In the current context, the characteristics of major importance are accuracy, precision, completeness, representativeness, and comparability. Using our established QA program, we determined the quality of this historical data based on its comparability to the post-1989 data. By accepting this historical data, we were able to save a considerable amount of money in recharacterization costs

  12. Integrating Natural Resource Damage Assessment and environmental restoration activities at DOE facilities

    Energy Technology Data Exchange (ETDEWEB)

    Bascietto, J.J. [Dept. of Energy, Washington, DC (US). RCRA/CERCLA Div.; Dunford, R.W. [Research Triangle Inst., Research Triangle Park, NC (US); Sharples, F.E.; Suter, G.W. II [Oak Ridge National Lab., TN (US)

    1993-06-01

    Environmental restoration activities are currently under way at several sites owned by the US Department of Energy (DOE) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. DOE is the CERCLA lead response agency for these activities. Section 120(a) of the Superfund Amendments and Reauthorization Act also subjects DOE to liability under Section 107 of CERCLA for natural resource damages resulting from hazardous substance releases at its sites. The Natural Resource Damage Assessment (NRDA) process, by which natural resource injuries are determined and compensatory monetary damages are calculated, is not well known or understood by DOE staff and contractors involved in environmental restoration activities. Nevertheless, natural resource liabilities are potentially a significant source of additional monetary claims for CERCLA hazardous substance releases. This paper describes the requirements of NRDA and explains how to integrate the NRDA and CERCLA Remedial Investigation/Feasibility Study processes, in order to more quickly restore environmental services at the lowest total cost to the public. The first section of the paper explains the statutory and regulatory mandates for the NRDA process. The second section briefly describes the four phases of the NRDA process, while the third section examines the three steps in the assessment phase in considerable detail. Finally, the last section focuses on the integration of the CERCLA and NRDA processes.

  13. Environmental restoration technology programs at Mesa State College: A strategic look at manpower needs

    International Nuclear Information System (INIS)

    Harrison, R.J.; Emilia, D.A.

    1991-01-01

    The environmental cleanup of Department of Energy (DOE) sites within the next 30 years requires strategic planning to ensure adequate manpower is available when needed. Manpower needs projections within DOE have been based on analyses of current industry trends that indicate a substantial shortage of scientists and engineers. This paper explores the idea that the manpower requirements of DOE's environmental restoration program are not yet fully realized by most sites, which are currently in the predecisional work phase. Experience at the Grand Junction Projects Office (GJPO), which has had environmental restoration as it primary mission for about 10 years, shows that in the postdecisional phases the manpower need for scientists and engineers decreases while the manpower need for technologists in technical, management, and support roles increases. The GJPO, with Mesa State College in Grand Junction, Colorado, has developed an Environmental Restoration Associate degree program based on a strategic look at its manpower needs. This program receives start-up funding from DOE and has received donations in the million dollar range from various industry and state government partners

  14. Waste management, decommissioning and environmental restoration for Canada's nuclear activities: 'Current practices and future needs'

    International Nuclear Information System (INIS)

    2006-01-01

    The Canadian Nuclear Society conference on Waste Management, Decommissioning and Environmental Restoration for Canada's Nuclear Activities was held on May 8-11, 2005 in Ottawa, Ontario, Canada. The objective of this Conference was to provide a forum for discussion and exchange of views on the technical, regulatory and social challenges and opportunities in radioactive waste management, nuclear facility decommissioning and environmental restoration activities in Canada. The Conference was organized into several plenary sessions and eight technical tracks: Low- and intermediate-level wastes; Uranium mining and milling wastes; Used nuclear fuel; Decommissioning; Environmental restoration; Policy, economics and social issues; Licensing and regulatory issues; and, Radioactive materials transportation. The three-day Conference involved waste management, decommissioning and environmental technology practitioners; delegates from industry, academia, and government agencies and regulators; consulting engineers; financial and legal experts; and other specialists working in the field. While the Conference had a primarily Canadian focus, about 10 per cent of the submissions received came from foreign and international organizations, which provided insights into how other countries are dealing with similar issues

  15. Environmental restoration in regions of uranium mining and milling in Ukraine: Progress, problems and perspectives

    International Nuclear Information System (INIS)

    Rudy, C.

    1997-01-01

    Uranium exploration activities in Ukraine were initiated in 1946. So far 21 uranium reserves have been identified in the Southern regions of Ukraine. Industrial scale mining has been undertaken in two main areas -ZhovtiVody (Dnipropetrovsk region) and more recently - near the city of Kirovograd. Uranium milling capabilities were created in ZhovtiVody and Dniprodzerzhinsk. At Dniprodzerzhinsk Prydniprovsky Chemical Plant uranium milling started in the late 40's, initially using ores from the countries of Central Europe. Lack of relevant environmental standards and appropriate technologies for uranium extraction contributed to contamination of both industrial and residential areas. As a result, about 1340 ha of industrial areas were contaminated and ecologically affected. Extensive utilization of waste rock pile for road and building construction in the 50's and 60's resulted in contamination of residential areas in the region. To provide a comprehensive solution to the radioecological problems of the ZhovtiVody area a State Programme of Actions up to the year 2005 was adopted by the Ukrainian government in 1995. A timely methodological and information support for national activities on environmental restoration in Ukraine was provided by IAEA regional project RER/9/022. In April 1996 under the framework of the RER/9/022 project, seminar on environmental restoration in regions of uranium mining and milling took place in the town of Zhovti Vody, that allowed involvement of local experts and organizations into the project activities directly. The proposed paper is based on the vast amount of data accumulated in Ukraine during RER/9/022 covering the period 1993-1996. Severe lack of finance adversely affected all activities within the nuclear sector, environmental restoration implementation being the most affected. In such circumstances RER/9/022 remained as one of the most valuable contributing factors in the development of regulations, guidance and practices in the

  16. Natural phenomena hazards evaluation of concrete silos 1, 2, 3 and 4 at Fernald, Ohio

    International Nuclear Information System (INIS)

    Char, C.V.; Shiner, T.J.

    1995-08-01

    Fernald Environmental Management Project (FEMP) is a United States Department of Energy (DOE) site located near Cincinnati, Ohio. FEMP was formerly established as the Feed Materials Production Center (FMPC) in 1951 under the Atomic Energy Commission. FEMP is currently undergoing site wide environmental remediation. This paper addresses four concrete silos built during the 1950s and located in Operable Unit 4 (OU-4). Silos 1 and 2 known as K-65 Silos contain residues from Uranium Ore processing. Silo 3 contains metal oxides in powder form. Silo 4 is empty. The Silos are categorized as low hazard facilities and the Natural Phenomena Hazards (NPH) performance category is PC-2, based on a recently completed safety analysis report. This paper describes the structural evaluation of concrete Silos 1, 2, 3 and 4 for NPH. Non Destructive Tests (NDT) were conducted to establish the current conditions of the silos. Analytical and computer methods were used to evaluate the stresses and displacements for different silo configurations and different loading combinations. Finite element models were developed to uniquely represent each silo, and analyzed using SAP90 computer program. The SAPLOT post processor was used for rapid determination of critical areas of concern for critical loading combinations and for varying silo configurations

  17. Preoperational baseline and site characterization report for the Environmental Restoration Disposal Facility. Volume 2, Revision 2

    International Nuclear Information System (INIS)

    Weekes, D.C.; Lindsey, K.A.; Ford, B.H.; Jaeger, G.K.

    1996-12-01

    This document is Volume 2 in a two-volume series that comprise the site characterization report, the Preoperational Baseline and Site Characterization Report for the Environmental Restoration Disposal Facility. Volume 1 contains data interpretation and information supporting the conclusions in the main text. This document presents original data in support of Volume 1 of the report. The following types of data are presented: well construction reports; borehole logs; borehole geophysical data; well development and pump installation; survey reports; preoperational baseline chemical data and aquifer test data. Five groundwater monitoring wells, six deep characterization boreholes, and two shallow characterization boreholes were drilled at the Environmental Restoration Disposal Facility (ERDF) site to directly investigate site-specific hydrogeologic conditions

  18. Methodology for decision making in environmental restoration after nuclear accidents: temas system (version 2.1)

    International Nuclear Information System (INIS)

    Montero, M.; Moraleda, M.; Claver, F.; Vazquez, C.; Gutierrez, J.

    2001-01-01

    TEMAS is an user-friendly decision aiding computerised system to help in the selection of the best local strategy of restoration when a post-accidental environmental contamination with long lived radionuclides (''137 Cs and ''90 Sr) must be faced TEMAS provides answer for complex scenarios on whichever place of the European Community territory ( urban agricultural and forest) with different specific levels of contamination, uses and dimensions. The initial version was the result of the TEMAS project (Techniques and Management Strategies for Environmental Restoration) supported by the EU during the 4th Framework Program. Some Aspects of the methodology are at present being improved. This document applies to the computerised version 2.1 (VAZ01). (Author)

  19. Progress in the environmental restoration at the Savannah River Site (SRS)

    International Nuclear Information System (INIS)

    Pope, J.M.; McClain, L.

    1992-01-01

    The Environmental Restoration (ER) Program has continued to achieve significant accomplishments important to the mission of cleaning up inactive waste sites, performing corrective actions on contaminated groundwater, planning for decontaminating/decommissioning surplus facilities and ensuring that the environment and the health and safety of people are protected. The multifaceted cleanup at SRS represents noteworthy milestones across the DOE complex. The associated lessons learned and key elements of the progress will be presented in the course of the paper

  20. Environmental Restoration Site-Specific Plan for the Paducah Gaseous Diffusion Plant, FY 93

    International Nuclear Information System (INIS)

    1993-01-01

    This report provides an overview of the major Environmental Restoration (ER) concerns at Paducah Gaseous Diffusion Plant (PGDP). The identified solid waste management units at PGDP are listed. In the Department of Energy (DOE) Five Year Plan development process, one or more waste management units are addressed in a series of activity data sheets (ADSs) which identify planned scope, schedule, and cost objectives that are representative of the current state of planned technical development for individual or multiple sites

  1. Qualitative risk evaluation of environmental restoration programs at Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Morris, S.C.

    1996-05-01

    This report documents the evaluation of risks associated with environmental restoration activities at Brookhaven National Laboratory using two tools supplied by DOE to provide a consistent set of risk estimates across the DOE complex: Risk Data Sheets (RDS) and Relative Risk Ranking. The tools are described, the process taken characterized, results provided and discussed. The two approaches are compared and recommendations provided for continuing improvement of the process.

  2. Environmental restoration contractor facility safety plan -- MO-561 100-D site remediation project

    International Nuclear Information System (INIS)

    Donahoe, R.L.

    1996-11-01

    This safety plan is applicable to Environmental Restoration Contractor personnel who are permanently assigned to MO-561 or regularly work in the facility. The MO-561 Facility is located in the 100-D Area at the Hanford Site in Richland, Washington. This plan will: (a) identify hazards potentially to be encountered by occupants of MO-561; (b) provide requirements and safeguards to ensure personnel safety and regulatory compliance; (c) provide information and actions necessary for proper emergency response

  3. Electronic document management meets environmental restoration recordkeeping requirements: A case study

    International Nuclear Information System (INIS)

    Burnham, S.L.

    1995-01-01

    Efforts at migrating records management at five Department of Energy sites operated under management by Lockheed Martin Energy Systems, Inc. for Environmental Restoration (ER) business activities are described. The corporate environment, project definition, records keeping requirements are described first. Then an evaluation of electronic document management technologies and of internal and commercially available systems are provided. Finally adopted incremental implementation strategy and lessons learned are discussed

  4. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

  5. Environmental Restoration Program waste minimization and pollution prevention self-assessment

    International Nuclear Information System (INIS)

    1994-10-01

    The Environmental Restoration (ER) Program within Martin Marietta Energy Systems, Inc. is currently developing a more active waste minimization and pollution prevention program. To determine areas of programmatic improvements within the ER Waste Minimization and Pollution Prevention Awareness Program, the ER Program required an evaluation of the program across the Oak Ridge K-25 Site, the Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, the Paducah Environmental Restoration and Waste Minimization Site, and the Portsmouth Environmental Restoration and Waste Minimization Site. This document presents the status of the overall program as of fourth quarter FY 1994, presents pollution prevention cost avoidance data associated with FY 1994 activities, and identifies areas for improvement. Results of this assessment indicate that the ER Waste Minimization and Pollution Prevention Awareness Program is firmly established and is developing rapidly. Several procedural goals were met in FY 1994 and many of the sites implemented ER waste minimization options. Additional growth is needed, however, for the ER Waste Minimization and Pollution Prevention Awareness Program

  6. Educational understanding of pollution prevention in decontamination and decommissioning/environmental restoration activities

    International Nuclear Information System (INIS)

    Betsch, M.D.; Lewis, R.A.

    1995-05-01

    Demolishing outdated structures from the US Department of Energy Hanford Site in Washington, generates large quantities of waste which can be minimized. The Hanford cleanup is one of the world's largest and most complex environmental restoration efforts. Approximately 280 square miles of ground water and soil are contaminated; there are more than 80 surplus facilities, including nine shut-down nuclear reactors in various stages of decay; and there are 177 underground waste storage tanks containing highly radioactive waste. In all, 1,500 cleanup sites have been identified and the Environmental Restoration Contractor (ERC) is currently responsible for surveillance and maintenance of 170 structures. A two hour orientation training in pollution prevention was developed by the Westinghouse Hanford Company to provide all Decontamination and Decommissioning/Environmental Restoration (D ampersand D/ER) personnel with the knowledge to apply waste minimization principles during their cleanup activities. The ERC Team Pollution Prevention Workshop serves to communicate pollution prevention philosophies and influences the way D ampersand D/ER projects are conducted at the Hanford Site

  7. A cost/schedule and control system for the environmental restoration program Albuquerque Field Office

    International Nuclear Information System (INIS)

    Fiske, Wanda S.; Bischoff, Edward L.; Rea, Kenneth H.; Dwain Farley, P.; Biedermann, Charles A.

    1992-01-01

    The Department of Energy (DOE) Field Office Albuquerque (AL), Environmental Restoration Project Office (ERPO), has developed a project management system used to plan, document, and control Environmental Restoration (ER) work at eight installations and one superfund site managed by AL. This system emphasizes control of the cost, schedule, and technical elements of the Program. It supports programmatic documentation such as the Environmental Restoration/Waste Management Five-Year Plan, Site Specific Plan, and budget requests. The System provides information used to manage the ER Program at all levels of management (i.e., from low-level day-to-day activities to high-level upper management). The System requires substantial effort to ensure reliability; however, the benefit to ERPO is an effective, proactive project management tool. This paper provides an overview of the ERPO System, an explanation of how it is implemented, and lessons learned from this process. Application of the System to cost estimating, annual and five-year budget preparation, resource projections, scheduling, and cost/schedule performance measurement is discussed. Also discussed are cost/schedule review procedures, along with variance identification and resolution. Examples are taken from the Pinellas ER Program. (author)

  8. Draft Waste Management Programmatic Environmental Impact Statement for managing treatment, storage, and disposal of radioactive and hazardous waste. Volume 3, Appendix A: Public response to revised NOI, Appendix B: Environmental restoration, Appendix C, Environmental impact analysis methods, Appendix D, Risk

    International Nuclear Information System (INIS)

    1995-08-01

    Volume three contains appendices for the following: Public comments do DOE's proposed revisions to the scope of the waste management programmatic environmental impact statement; Environmental restoration sensitivity analysis; Environmental impacts analysis methods; and Waste management facility human health risk estimates

  9. Environmental restoration and waste management Site-Specific Plan for the Oak Ridge Reservation

    International Nuclear Information System (INIS)

    1993-01-01

    The United States Department of Energy (DOE) is committed to achieving and maintaining environmental regulatory compliance while responding to public concerns and emphasizing waste minimization. DOE publishes the Environmental Restoration and Waste Management Five-Year Plan (FYP) annually to document its progress towards these goals. The purpose of this Site-Specific Plan (SSP) is to describe the activities undertaken to implement the FYP goals at the DOE Oak Ridge Field Office (DOE/OR) installations and programs specifically for the Oak Ridge Reservation (ORR) and surrounding areas. This SSP addresses activities and goals to be accomplished during FY93 even through the FYP focuses on FY94

  10. Environmental restoration and waste management Site-Specific Plan for the Oak Ridge Reservation. FY 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-15

    The United States Department of Energy (DOE) is committed to achieving and maintaining environmental regulatory compliance while responding to public concerns and emphasizing waste minimization. DOE publishes the Environmental Restoration and Waste Management Five-Year Plan (FYP) annually to document its progress towards these goals. The purpose of this Site-Specific Plan (SSP) is to describe the activities undertaken to implement the FYP goals at the DOE Oak Ridge Field Office (DOE/OR) installations and programs specifically for the Oak Ridge Reservation (ORR) and surrounding areas. This SSP addresses activities and goals to be accomplished during FY93 even through the FYP focuses on FY94.

  11. Environmental restoration and waste management five-year plan, Fiscal years 1994--1998

    International Nuclear Information System (INIS)

    1993-01-01

    In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of environmental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Over the past three years, the Five Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE's commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE's environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. The Five-Year Plan is not exclusively focused on near-term activities. It also expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. This goal was established in response to recommendations from the State and Tribal Government Working Group (STGWG) that DOE define a specific end point for completing necessary remediation and restoration activities. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals

  12. Payments for environmental services in Latin America as a tool for restoration and rural development.

    Science.gov (United States)

    Montagnini, Florencia; Finney, Christopher

    2011-05-01

    Payments for Environmental Services (PES) can encourage projects that enhance restoration, production, and rural development. When projects promote differentiated systems by paying farmers for the provision of services, the application of PES requires evaluation of the environmental services provided by each system. We present evaluations of carbon stocks and biodiversity in pure and mixed native tree plantations in Costa Rica. To illustrate how monetary values can be assigned, we discuss a project that awarded PES to silvopastoral systems in Costa Rica, Nicaragua, and Colombia based on carbon stocks and biodiversity. PES can promote positive environmental attitudes in farmers. Currently this project is being scaled up in Colombia based on their positive experiences with PES as a tool to promote adoption. Compared to PES systems that include only one environmental service, systems that incorporate bundling or layering of multiple services can make sustainable land uses more attractive to farmers and reduce perverse incentives.

  13. Characterization of hazardous waste residuals from Environmental Restoration Program activities at DOE installations: Waste management implications

    International Nuclear Information System (INIS)

    Lazaro, M.A.; Esposito, M.P.

    1995-01-01

    Investigators at Argonne National Laboratory (ANL), with support from associates at the Pacific Northwest Laboratory (PNL), have assembled an inventory of the types and volumes of radioactive, toxic or hazardous, and mixed waste likely to be generated over the next 30 years as the US Department of Energy (DOE) implements its nationwide Environmental Restoration (ER) Program. The inventory and related analyses are being considered for integration into DOE's Programmatic Environmental Impact Statement (PEIS) covering the potential environmental impacts and risks associated with alternative management practices and programs for wastes generated from routine operations. If this happens, the ER-generated waste could be managed under a set of alternatives considered under the PEIS and selected at the end of the current National Environmental Policy Act process

  14. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    This site management for the Environmental Restoration (ER) Program implements the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) (EPA 1990), also known as an Interagency Agreement (IAG), hereafter referred to as the Agreement.'' The Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC), hereafter known as the Parties,'' entered into this Agreement for the purpose of coordinating remediation activities undertaken on the ORR to comply with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) as amended by the Superfund Amendments, the Resource Conservation and Recovery Act (RCRA), and the National Environmental Policy Act (NEPA). 7 refs., 17 figs.

  15. Using cost/risk uncertainty spheres to make better environmental restoration decisions

    International Nuclear Information System (INIS)

    Shangraw, R.F.; Cheney, C.S.; Shangraw, W.R.

    1994-01-01

    The process of balancing cost expenditures and risk reductions during environmental restoration (ER) activities (and as part of other environmental programs such as waste management and facility transition) is the critical policy decision facing DOE site decisionmakers and associated stakeholders (including regulators). The ground rules for this process are specified formally in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, the Resource Conservation and Recovery Act, as amended, the subsequent regulations (e.g., National Contingency Plan) and policies that EPA and State agencies have issued to implement these programs, and (increasingly) interagency agreements and orders. Clearly, as Federal resources to meet environmental commitments become more constrained, cost and risk management tradeoffs will become even more needed and their results pronounced

  16. Evaluation of measurement reproducibility using the standard-sites data, 1994 Fernald field characterization demonstration project

    International Nuclear Information System (INIS)

    Rautman, C.A.

    1996-02-01

    The US Department of Energy conducted the 1994 Fernald (Ohio) field characterization demonstration project to evaluate the performance of a group of both industry-standard and proposed alternative technologies in describing the nature and extent of uranium contamination in surficial soils. Detector stability and measurement reproducibility under actual operating conditions encountered in the field is critical to establishing the credibility of the proposed alternative characterization methods. Comparability of measured uranium activities to those reported by conventional, US Environmental Protection Agency (EPA)-certified laboratory methods is also required. The eleven (11) technologies demonstrated included (1) EPA-standard soil sampling and laboratory mass-spectroscopy analyses, and currently-accepted field-screening techniques using (2) sodium-iodide scintillometers, (3) FIDLER low-energy scintillometers, and (4) a field-portable x-ray fluorescence spectrometer. Proposed advanced characterization techniques included (5) alpha-track detectors, (6) a high-energy beta scintillometer, (7) electret ionization chambers, (8) and (9) a high-resolution gamma-ray spectrometer in two different configurations, (10) a field-adapted laser ablation-inductively coupled plasma-atomic emission spectroscopy (ICP-AES) technique, and (11) a long-range alpha detector. Measurement reproducibility and the accuracy of each method were tested by acquiring numerous replicate measurements of total uranium activity at each of two ''standard sites'' located within the main field demonstration area. Meteorological variables including temperature, relative humidity. and 24-hour rainfall quantities were also recorded in conjunction with the standard-sites measurements

  17. Decrease of Environmental Radioactivity After Terminated Restoration of the Uranium Mine Site at Zirovski Vrh (Slovenia)

    International Nuclear Information System (INIS)

    Krizman, M.J.; Rojc, J.

    2011-01-01

    The uranium mining and milling complex at Zirovski vrh, located 45 km NW from Ljubljana, was in operation in the period 1985 - 1990 and produced about 452 tonnes of yellow cake. In parallel, over 0.6 million tonnes of technological tailings and 2.6 million tonnes of mine waste rock were generated and deposited on separate disposal sites in close vicinity of the mining site, with the total area of 10 hectares. The disposal sites were completely restored, mostly in the last decade. The processing plant, located in the Brebovscica valley, was decommissioned in the nineties. All provisional facilities were removed from the central site at Todraz and transferred to the mine waste deposit. The restoration works were finished in 2010, twenty years after the cessation of uranium production. Radioactive discharges and radioactivity in the environment were monitored during operation of the uranium mine, continued during restoration phases and will be monitored a certain period afterwards. The aim of this paper is to present the radioactive discharges and enhanced levels of radioactivity in the nearby environment, monitored during the operation period of the U-mine and after terminated restoration works. The most significant decreases of radioactivity after the restoration of the site were identified. The results of environmental radioactivity monitoring showed that radioactivity steadily decreased according to the different phases of the mine decommission. After restoration, radioactivity levels on the site and in close vicinity are approaching to the background levels, except for radon in air and for waters. Consequently, radiation exposure to the reference groups of the population decreased from 0.3 - 0.4 mSv per year during operation to about 0.1 mSv per year after finalized restoration works. This figure is much lower than the authorised limit of 0.3 mSv per year, set by the Slovenian competent authority. Still enhanced levels of radioactivity were found in surface

  18. Zooplankton biodiversity and community structure vary along spatiotemporal environmental gradients in restored peridunal ponds

    Directory of Open Access Journals (Sweden)

    Maria Anton-Pardo

    2015-11-01

    Full Text Available Zooplankton assemblages in neighboring ponds can show important spatial and temporal heterogeneity. Disentangling the influence of regional versus local factors, and of deterministic versus stochastic processes has been recently highlighted in the context of the metacommunity theory. In this study, we determined patterns of temporal and spatial variation in zooplankton diversity along one hydrological year in restored ponds of different hydroperiod and age. The following hypotheses regarding the assembling of species over time were tested: i dispersal is not limited in our study system due to its small area and high exposure to dispersal vectors; ii community dissimilarity among ponds increases with restoration age due to an increase in environmental heterogeneity and stronger niche-based assemblages;and iii similarity increases with decreasing hydroperiod because hydroperiod is a strong selective force filtering out organisms with long life cycles. Our results confirmed dispersal as a homogenizing force and local factors as gaining importance with time of restoration. However, short hydroperiod ponds were highly dissimilar, maybe due to the environmental differences among these ponds, or to high stochasticity followed by priority effects under a weak selection pressure. By adding a temporal dimension to the study of zooplankton structuring, we could identify the first months after flooding as being crucial for species richness, especially in short hydroperiod ponds; and we detected differences in seasonal species richness related to hydroperiod and pond age.

  19. Poverty Alleviation and Environmental Restoration Using the Clean Development Mechanism: A Case Study from Humbo, Ethiopia

    Science.gov (United States)

    Brown, Douglas R.; Dettmann, Paul; Rinaudo, Tony; Tefera, Hailu; Tofu, Assefa

    2011-08-01

    Poverty, hunger and demand for agricultural land have driven local communities to overexploit forest resources throughout Ethiopia. Forests surrounding the township of Humbo were largely destroyed by the late 1960s. In 2004, World Vision Australia and World Vision Ethiopia identified forestry-based carbon sequestration as a potential means to stimulate community development while engaging in environmental restoration. After two years of consultation, planning and negotiations, the Humbo Community-based Natural Regeneration Project began implementation—the Ethiopian organization's first carbon sequestration initiative. The Humbo Project assists communities affected by environmental degradation including loss of biodiversity, soil erosion and flooding with an opportunity to benefit from carbon markets while reducing poverty and restoring the local agroecosystem. Involving the regeneration of 2,728 ha of degraded native forests, it brings social, economic and ecological benefits—facilitating adaptation to a changing climate and generating temporary certified emissions reductions (tCERs) under the Clean Development Mechanism. A key feature of the project has been facilitating communities to embrace new techniques and take responsibility for large-scale environmental change, most importantly involving Farmer Managed Natural Regeneration (FMNR). This technique is low-cost, replicable, and provides direct benefits within a short time. Communities were able to harvest fodder and firewood within a year of project initiation and wild fruits and other non-timber forest products within three years. Farmers are using agroforestry for both environmental restoration and income generation. Establishment of user rights and local cooperatives has generated community ownership and enthusiasm for this project—empowering the community to more sustainably manage their communal lands.

  20. Poverty alleviation and environmental restoration using the clean development mechanism: A case study from Humbo, Ethiopia.

    Science.gov (United States)

    Brown, Douglas R; Dettmann, Paul; Rinaudo, Tony; Tefera, Hailu; Tofu, Assefa

    2011-08-01

    Poverty, hunger and demand for agricultural land have driven local communities to overexploit forest resources throughout Ethiopia. Forests surrounding the township of Humbo were largely destroyed by the late 1960s. In 2004, World Vision Australia and World Vision Ethiopia identified forestry-based carbon sequestration as a potential means to stimulate community development while engaging in environmental restoration. After two years of consultation, planning and negotiations, the Humbo Community-based Natural Regeneration Project began implementation--the Ethiopian organization's first carbon sequestration initiative. The Humbo Project assists communities affected by environmental degradation including loss of biodiversity, soil erosion and flooding with an opportunity to benefit from carbon markets while reducing poverty and restoring the local agroecosystem. Involving the regeneration of 2,728 ha of degraded native forests, it brings social, economic and ecological benefits--facilitating adaptation to a changing climate and generating temporary certified emissions reductions (tCERs) under the Clean Development Mechanism. A key feature of the project has been facilitating communities to embrace new techniques and take responsibility for large-scale environmental change, most importantly involving Farmer Managed Natural Regeneration (FMNR). This technique is low-cost, replicable, and provides direct benefits within a short time. Communities were able to harvest fodder and firewood within a year of project initiation and wild fruits and other non-timber forest products within three years. Farmers are using agroforestry for both environmental restoration and income generation. Establishment of user rights and local cooperatives has generated community ownership and enthusiasm for this project--empowering the community to more sustainably manage their communal lands.

  1. Oak Ridge Environmental Information System (ORIES) site workstation information packet for OREIS V1.2. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Voorhees, L.D.; McCord, R.A.; Durfee, R.C.; Land, M.L.; Olson, R.J.; Palmer, M.R.; Thomas, J.K.; Tinnel, E.P.; Zygmunt, B.C.

    1993-02-01

    The OREIS site workstation information packet was developed to accompany the OREIS site workstations, which are being delivered to the Environmental Restoration programs at the five DOE-OR sites. The packet is written specifically for the Site ER program staff at each of the five Sites who have been designated the OREIS contact by their ER program manager, and is not intended for general distribution. The packet provides an overview of the components of OREIS, points to more detailed information provided in the accompanying vendor and OREIS developed manuals, and includes information on training opportunities and user support.

  2. Streamlined approach for environmental restoration (SAFER): Development, implementation, and lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Smyth, J.D. [CH2M Hill Richland, WA (United States); Amaya, J.P. [Pacific Northwest Lab., Richland, WA (United States)

    1994-05-01

    This report reviews the US Department of Energy`s (DOE`s) Streamlined Approach for Environmental Restoration (SAFER) effort during FY 1992, FY 1993, and the first quarter of FY 1994. The report comprises three sections: Introduction, Activities Summary, and Lessons Learned and Related Activities. This section provides context for the report by briefly reviewing the development of SAFER and its operational assumptions. Section 2 describes SAFER workshops and site-specific SAFER implementation support. Additionally, Section 2 provides an update on the status of sites that initially received support from either Observational Approach or SAFER teams and subsequently implemented either of these two related approaches to site restoration streamlining. Section 3 describes lessons learned and upcoming SAFER activities.

  3. Environmental liability and nature protection areas Will the EU Environmental Liability Directive actually lead to the restoration of damaged natural resources?

    NARCIS (Netherlands)

    Broek, G.M. van den

    2009-01-01

    The EU Environmental Liability Directive (ELD) requires remedial measures when environmental damage to protected species and natural habitats occurs. Thus, the ELD offers a minimum level of protection to natural resources in its Article 2. In order to finance the restoration of environmental damage

  4. EnviroTRADE: An International Environmental Restoration and Waste Management Information System

    International Nuclear Information System (INIS)

    Johnson, S.W.; Harlan, C.P.; Harrington, M.W.; Bergeron, K.D.; Rehorn, A.S.

    1993-01-01

    The US Department of Energy (DOE) has collected, and will continue to collect, large amounts of information on its environmental waste sites and associated technology development efforts. This information is being gathered in a variety of formats for various purposes. Integration and delivery of this information WW benefit decision makers, waste site managers, technology developers, regulators, and the private sector. No computer system currently exists that acts as an easy-to-use computer umbrella over all of the DOE's environmental information. The EnviroTRADE Information System, currently under development for the DOE's Environmental Restoration and Waste Management's (EM's) Office of Technology Development, provides access to a wide variety of information within a single architecture. Ongoing system development is expected to result in an extensive, networked interface to EM's diverse data benefiting a variety of users. This paper discusses the present status of the EnviroTRADE Information System as well as current and future development activities

  5. Strategic alliance for environmental restoration - results of the Chicago Pile 5 large scale demonstration project

    International Nuclear Information System (INIS)

    Aker, R.E.; Bradley, T.L.; Bhattacharyya, S.

    1998-01-01

    The world's largest environmental cleanup effort is focused upon the DOE weapons complex. These cleanup efforts parallel those which will be required as the commercial nuclear industry reaches the end of licensed life. The strategic Alliance for Environmental Restoration (Strategic Alliance), reflects the cooperative interest of industry, commercial nuclear utilities, university and national laboratory team members to bring a collaborative best-in-class approach to finding, and providing effective delivery of innovative environmental remediation technologies to the DOE Complex and subsequently to industry. The Strategic Alliance is comprised of team members from ComEd, Duke Engineering and Services, 3M, ICF Kaiser, Florida International University, and Argonne National Laboratory in concert with DOE. This team tested and evaluated over twenty innovative technologies in an effort to help provide cost effective technology solutions to DOE/Industry needs for decontamination and decommissioning. This paper summarizes the approach used by the Strategic Alliance and describes the results of this DOE funded project

  6. Lower Yakima Valley Wetlands and Riparian Restoration Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration

    1994-10-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Mitigation Agreement pertaining to the Lower Yakima Valley Wetlands and Riparian Restoration Project (Project) in a cooperative effort with the Yakama Indian Nation and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities for the Project within the boundaries of the Yakama Indian Reservation. This Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large 20, 340 hectare (50, 308 acre) project area. As individual properties are secured for the Project, three site-specific activities (habitat enhancement, operation and maintenance, and monitoring and evaluation) may be subject to further site-specific environmental review. All required Federal/Tribal coordination, permits and/or approvals would be obtained prior to ground disturbing activities.

  7. Lower Yakima Valley Wetlands and Riparian Restoration Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1994-01-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Mitigation Agreement pertaining to the Lower Yakima Valley Wetlands and Riparian Restoration Project (Project) in a cooperative effort with the Yakama Indian Nation and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities for the Project within the boundaries of the Yakama Indian Reservation. This Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large 20, 340 hectare (50, 308 acre) project area. As individual properties are secured for the Project, three site-specific activities (habitat enhancement, operation and maintenance, and monitoring and evaluation) may be subject to further site-specific environmental review. All required Federal/Tribal coordination, permits and/or approvals would be obtained prior to ground disturbing activities

  8. Sulimar Queen environmental restoration project closure package Sandia environmental stewardship exemplar.

    Energy Technology Data Exchange (ETDEWEB)

    Tillman, Jack B.

    2008-09-01

    In March 2008, Sandia National Laboratories (Sandia), in partnership with the Bureau of Land Management, Roswell Field Office, completed its responsibilities to plug and abandon wells and restore the surface conditions for the Sulimar Queens Unit, a 2,500 acre oil field, in Chaves County, Southeast New Mexico. Sandia assumed this liability in an agreement to obtain property to create a field laboratory to perform extensive testing and experimentation on enhanced oil recovery techniques for shallow oil fields. In addition to plugging and abandoning 28 wells, the project included the removal of surface structures and surface reclamation of disturbed lands associated with all plugged and abandoned wells, access roads, and other auxiliary facilities within unit boundaries. A contracting strategy was implemented to mitigate risk and reduce cost. As the unit is an important wildlife habitat for prairie chickens, sand dune lizards, and mule deer, the criteria for the restoration and construction process were designed to protect and enhance the wildlife habitat. Lessons learned from this project include: (1) extreme caution should be exercised when entering agreements that include future liabilities, (2) partnering with the regulator has huge benefits, and (3) working with industry experts, who were familiar with the work, and subcontractors, who provided the network to complete the project cost effectively.

  9. Proceedings of Workshop on Uranium Production Environmental Restoration: An exchange between the United States and Germany

    International Nuclear Information System (INIS)

    1993-01-01

    Scientists, engineers, elected officials, and industry regulators from the United, States and Germany met in Albuquerque, New Mexico, August 16--20, 1993, in the first joint international workshop to discuss uranium tailings remediation. Entitled ''Workshop on Uranium Production Environmental Restoration: An Exchange between the US and Germany,'' the meeting was hosted by the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The goal of the workshop was to further understanding and communication on the uranium tailings cleanup projects in the US and Germany. Many communities around the world are faced with an environmental legacy -- enormous quantities of hazardous and low-level radioactive materials from the production of uranium used for energy and nuclear weapons. In 1978, the US Congress passed the Uranium Mill Tailings Radiation Control Act. Title I of the law established a program to assess the tailings at inactive uranium processing sites and provide a means for joint federal and state funding of the cleanup efforts at sites where all or substantially all of the uranium was produced for sale to a federal agency. The UMTRA Project is responsible for the cleanup of 24 sites in 10 states. Germany is facing nearly identical uranium cleanup problems and has established a cleanup project. At the workshop, participants had an opportunity to interact with a broad cross section of the environmental restoration and waste disposal community, discuss common concerns and problems, and develop a broader understanding of the issues. Abstracts are catalogued individually for the data base

  10. A general theory to explain the relatively high cost of environmental restoration at DOE facilities

    International Nuclear Information System (INIS)

    Sullivan, W.H.

    1995-01-01

    Environmental Restoration costs for Department of Energy (DOE) facilities have been the subject of much scrutiny and concern for several years. General opinion is that DOE clean-up costs are as much as three times higher than costs for similar clean-up projects in the private sector. Consequently, DOE Environmental Restoration professionals are continually under pressure to do more with less, which, ironically, can lead to additional inefficiencies in the system. This paper proposes a general theory as to why DOE costs are higher, explains the reasons why current conditions will make it difficult to realize any pervasive or significant decreases in clean-up costs, and presents some general changes that need to take place in the DOE system in order to bring about conditions that will allow more efficient clean-up to occur. The theory is based on a simple economic model that describes the balance between the resources spent for risk avoidance and the corresponding changes in overall productivity as a function of risk. The elementary concepts illustrated with the economic model, when refined and specifically applied, have the potential to become the catalyst for significant change-change that is absolutely necessary if we truly intend to conduct environmental clean-up with the same efficiencies as private industry

  11. Proceedings of Workshop on Uranium Production Environmental Restoration: An exchange between the United States and Germany

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    Scientists, engineers, elected officials, and industry regulators from the United, States and Germany met in Albuquerque, New Mexico, August 16--20, 1993, in the first joint international workshop to discuss uranium tailings remediation. Entitled ``Workshop on Uranium Production Environmental Restoration: An Exchange between the US and Germany,`` the meeting was hosted by the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The goal of the workshop was to further understanding and communication on the uranium tailings cleanup projects in the US and Germany. Many communities around the world are faced with an environmental legacy -- enormous quantities of hazardous and low-level radioactive materials from the production of uranium used for energy and nuclear weapons. In 1978, the US Congress passed the Uranium Mill Tailings Radiation Control Act. Title I of the law established a program to assess the tailings at inactive uranium processing sites and provide a means for joint federal and state funding of the cleanup efforts at sites where all or substantially all of the uranium was produced for sale to a federal agency. The UMTRA Project is responsible for the cleanup of 24 sites in 10 states. Germany is facing nearly identical uranium cleanup problems and has established a cleanup project. At the workshop, participants had an opportunity to interact with a broad cross section of the environmental restoration and waste disposal community, discuss common concerns and problems, and develop a broader understanding of the issues. Abstracts are catalogued individually for the data base.

  12. Establishment of review groups on US Department of Energy Environmental Restoration and Waste Management Program

    International Nuclear Information System (INIS)

    Eyman, L.D.

    1992-12-01

    A primary purpose of this grant was the establishment of expert research review groups to help facilitate expanded and improved communications and information among states, public, federal agencies, contractors, and DOE, relative to national environmental and waste management issues/problems. The general objectives of this grant were: Research on the further participation avenues of industry and academia and provide appropriate research documentation concerning the implementation of multi-party agreements; Analysis of the impediments that delay the accomplishment of agreements between states and the federal government for environmental compliance, as well as an assessment of the public need for research because of the above agreements; Analysis of the impact of environmental actions on states, industry, academia, public and other federal agencies; Provide research to help facilitate an interactive system that provides the various involved parties the capability and capacity to strengthen their commitment to national environmental and waste management goals and objectives; and Furthering research of public education in the environmental arena and research of needed national education resources in scientific and technical areas related to environmental restoration and waste management

  13. A systematic approach to evaluate erosion potential at environmental restoration sites

    International Nuclear Information System (INIS)

    Veenis, S.J.; Mays, D.C.

    1998-01-01

    The Environmental Restoration (ER) Project at the Los Alamos National Laboratory (LANL) is responsible for investigation and remediation of solid waste management units (SWMUs) under the Resource Conservation and Recovery Act and area of concerns (AOCs) under the direction of the Department of Energy. During the investigation and remediation phases, information may be gathered that indicates that conditions may be present at the site which may effect surface water quality. Depending on the constituent found, its concentration, and erosion/sediment transport potential, it may be necessary to implement temporary or permanent mitigative measures

  14. US Department of Energy Oak Ridge Field Office Environmental Restoration Program review

    International Nuclear Information System (INIS)

    1992-05-01

    This document summarizes the baselined FY 1993 Department of Energy Oak Ridge Field Office (DOE-OR) Environmental Restoration Program task priorities, budgets, and associated abbreviated task descriptions. Also included is a description of the approach utilized to establish priorities for the FY 1993 and FY 1994 budget process. Abbreviated task descriptions for FY 1994 are also included in priority listing. These FY 1994 tasks form the basis for the Activity Data Sheets prepared for DOE-OR that were submitted in May 1992

  15. Environmental restoration and waste management five-year plan, Fiscal years 1994--1998

    International Nuclear Information System (INIS)

    1993-01-01

    The US Department of Energy (DOE) understands that cleaning up the Nation's nuclear-related sites and facilities affects many different segments of the public, ranging from communities near DOE facilities to engineers concerned with developing new technologies to clean up the environment. In an effort to make the Environmental Restoration and Waste Management Five-Year Plan for Fiscal Years (FY) 1994--1998 more responsive to your concerns, DOE invites your comments on the plan. Volume II contains 37 Installation Summaries that provide a synopsis of past, present and future activities of each major installation, and Progress Charts

  16. Strategic plan and strategy of the Oak Ridge National Laboratory Environmental Restoration Program

    International Nuclear Information System (INIS)

    1995-06-01

    This report provides information about the use of an integrated strategic plan, strategy, and life-cycle baseline in the long range planning and risk process employed by the environmental restoration program at the Oak Ridge National Laboratory (ORNL). Long-range planning is essential because the ER Program encompasses hundreds of sites; will last several decades; and requires complex technology, management, and policy. Long-range planning allows a focused, cost-effective approach to identify and meet Program objectives. This is accomplished through a strategic plan, a strategy, and a life-cycle baseline. This long-range methodology is illustrated below

  17. New model for public participation at Sandia National Laboratories: What comes after environmental restoration?

    International Nuclear Information System (INIS)

    KEENER R, WILLIAM; BACA, STEPHEN S.; BACA, MAUREEN R.; STOTTS, AL; TOOPS, TAMI; WOLFF, THEODORE A.

    2000-01-01

    As the Sandia National Laboratories' Environmental Restoration (ER) project moves toward closure, the project's experiences--including a number of successes in the public participation arena--suggest it is time for a new, more interactive model for future government-citizen involvement. This model would strive to improve the quality of public interaction with the Department of Energy (DOE) and Sandia, by using subject-specific working groups and aiming for long-term trustful relationships with the community. It would make use of interactive techniques, fewer formal public forums, and a variety of polling and communication technologies to improve information gathering and exchange

  18. Environmental restoration at the Pantex Plant. Quarterly progress report, April 12, 1995--June 30, 1995

    International Nuclear Information System (INIS)

    Charbeneau, R.J.

    1995-01-01

    This report summarizes the Work Plans for activities associated with Environmental Restoration of the perched aquifer and contaminated soils at the Pantex Plant. The Higher Education Consortium/Pantex Research Laboratory is participating in the Consortium Grant to evaluate subsurface remediation alternatives for the perched aquifer at the Pantex Plant. Research activities will develop site characterization data and evaluate remediation alternatives for the perched aquifer and the overlying vadose zone. The work plans cover research activities for the remainder of FY95, and proposed activities for FY96 and thereafter. A separate document will present more detailed plans for FY96 activities and budget requirements

  19. Information Management Architecture for an Integrated Computing Environment for the Environmental Restoration Program. Volume 1, Introduction

    International Nuclear Information System (INIS)

    1994-09-01

    As part of the Environmental Restoration Program at Martin Marietta, IEM (Information Engineering Methodology) was developed as part of a complete and integrated approach to the progressive development and subsequent maintenance of automated data sharing systems. This approach is centered around the organization's objectives, inherent data relationships and business practices. IEM provides the Information Systems community with a tool kit of disciplined techniques supported by automated tools. It includes seven stages: Information Strategy Planning; Business Area Analysis; Business System Design; Technical Design; Construction; Transition; Production

  20. Environmental Restoration and Waste Management Site-Specific Plan for Fiscal Year 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    The Idaho National Engineering Laboratory (INEL) is a US Department of Energy (DOE) multiprogram laboratory whose primary mission has been to research nuclear technologies. Working with these technologies and conducting other types of research generates waste, including radioactive and/or hazardous wastes. While most of the waste treatment, storage, and disposal practices have been effective, some practices have led to the release of contaminants to the environment. As a result, DOE has developed (1) an Environmental Restoration (ER) Program to identify and, where necessary, cleanup releases from inactive waste sites and (2) a Waste Management (WM) Program to safely treat, store, and dispose of DOE wastes generated from current and future activities in an environmentally sound manner. This document describes the plans for FY 1993 for the INEL`s ER and WM programs as managed by DOE`s Idaho Field Office (DOE-ID).

  1. Environmental Restoration and Waste Management Site-Specific Plan for Fiscal Year 1993

    International Nuclear Information System (INIS)

    1993-03-01

    The Idaho National Engineering Laboratory (INEL) is a US Department of Energy (DOE) multiprogram laboratory whose primary mission has been to research nuclear technologies. Working with these technologies and conducting other types of research generates waste, including radioactive and/or hazardous wastes. While most of the waste treatment, storage, and disposal practices have been effective, some practices have led to the release of contaminants to the environment. As a result, DOE has developed (1) an Environmental Restoration (ER) Program to identify and, where necessary, cleanup releases from inactive waste sites and (2) a Waste Management (WM) Program to safely treat, store, and dispose of DOE wastes generated from current and future activities in an environmentally sound manner. This document describes the plans for FY 1993 for the INEL's ER and WM programs as managed by DOE's Idaho Field Office (DOE-ID)

  2. Requirements for quality control of analytical data for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    Engels, J.

    1992-12-01

    The Environmental Restoration (ER) Program was established for the investigation and remediation of inactive US Department of Energy (DOE) sites and facilities that have been declared surplus in terms of their previous uses. The purpose of this document is to Specify ER requirements for quality control (QC) of analytical data. Activities throughout all phases of the investigation may affect the quality of the final data product, thus are subject to control specifications. Laboratory control is emphasized in this document, and field concerns will be addressed in a companion document Energy Systems, in its role of technical coordinator and at the request of DOE-OR, extends the application of these requirements to all participants in ER activities. Because every instance and concern may not be addressed in this document, participants are encouraged to discuss any questions with the ER Quality Assurance (QA) Office, the Analytical Environmental Support Group (AESG), or the Analytical Project Office (APO)

  3. Health and safety plan for operations performed for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    Trippet, W.A. II; Reneau, M.; Morton, S.L.

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG ampersand G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP

  4. Health and safety plan for operations performed for the Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Trippet, W.A. II (IT Corp., (United States)); Reneau, M.; Morton, S.L. (EG and G Idaho, Inc., Idaho Falls, ID (United States))

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  5. Information management architecture for an integrated computing environment for the Environmental Restoration Program. Environmental Restoration Program, Volume 3, Interim technical architecture

    International Nuclear Information System (INIS)

    1994-09-01

    This third volume of the Information Management Architecture for an Integrated Computing Environment for the Environmental Restoration Program--the Interim Technical Architecture (TA) (referred to throughout the remainder of this document as the ER TA)--represents a key milestone in establishing a coordinated information management environment in which information initiatives can be pursued with the confidence that redundancy and inconsistencies will be held to a minimum. This architecture is intended to be used as a reference by anyone whose responsibilities include the acquisition or development of information technology for use by the ER Program. The interim ER TA provides technical guidance at three levels. At the highest level, the technical architecture provides an overall computing philosophy or direction. At this level, the guidance does not address specific technologies or products but addresses more general concepts, such as the use of open systems, modular architectures, graphical user interfaces, and architecture-based development. At the next level, the technical architecture provides specific information technology recommendations regarding a wide variety of specific technologies. These technologies include computing hardware, operating systems, communications software, database management software, application development software, and personal productivity software, among others. These recommendations range from the adoption of specific industry or Martin Marietta Energy Systems, Inc. (Energy Systems) standards to the specification of individual products. At the third level, the architecture provides guidance regarding implementation strategies for the recommended technologies that can be applied to individual projects and to the ER Program as a whole

  6. Information management architecture for an integrated computing environment for the Environmental Restoration Program. Environmental Restoration Program, Volume 3, Interim technical architecture

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This third volume of the Information Management Architecture for an Integrated Computing Environment for the Environmental Restoration Program--the Interim Technical Architecture (TA) (referred to throughout the remainder of this document as the ER TA)--represents a key milestone in establishing a coordinated information management environment in which information initiatives can be pursued with the confidence that redundancy and inconsistencies will be held to a minimum. This architecture is intended to be used as a reference by anyone whose responsibilities include the acquisition or development of information technology for use by the ER Program. The interim ER TA provides technical guidance at three levels. At the highest level, the technical architecture provides an overall computing philosophy or direction. At this level, the guidance does not address specific technologies or products but addresses more general concepts, such as the use of open systems, modular architectures, graphical user interfaces, and architecture-based development. At the next level, the technical architecture provides specific information technology recommendations regarding a wide variety of specific technologies. These technologies include computing hardware, operating systems, communications software, database management software, application development software, and personal productivity software, among others. These recommendations range from the adoption of specific industry or Martin Marietta Energy Systems, Inc. (Energy Systems) standards to the specification of individual products. At the third level, the architecture provides guidance regarding implementation strategies for the recommended technologies that can be applied to individual projects and to the ER Program as a whole.

  7. Evaluation of mid-to-long term basic research for environmental restoration

    International Nuclear Information System (INIS)

    1989-09-01

    This document describes a long-term basic research program for the US Department of Energy (DOE) that complements departmental initiatives in waste management and site cleanup. The most important problems faced by DOE are environmental restoration of waste sites and cleanup of inactive facilities. Environmental restoration is defined in this report as characterization, assessment, remediation, and post-closure verification within the waste/environmental system at DOE sites. Remediation of inactive, contaminated waste-disposal sites is the largest and most expensive task facing DOE. Immobilization, isolation, separation, and destruction of waste, either aboveground or in situ, are difficult and costly tasks. Technologies for these tasks are primitive or do not exist. Departmental problems in the long term are being analyzed scientifically and research needs are being identified. When completed, the Office of Energy Research's (OER's) basis research plan will describe potential scientific research needs for universities, national laboratories, and others as a basis for research proposals to DOE. Extensive interaction with the scientific community is planned to further refine and prioritize research needs. Basic research within DOE is directed toward fundamental knowledge leading to the discovery of new scientific or engineering concepts and principles that may or may not have immediate specific technological applications. However, because DOE is a mission-oriented agency, basic research in DOE is strongly influenced by national energy and environmental policy and may be multidisciplinary in nature. Basic research will provide innovative concepts and the fundamental knowledge base that facilitates the development and application of new and emerging technologies. 41 refs., 5 figs., 9 tabs

  8. Annual Status Report (FY2016) Performance Assessment for the Environmental Restoration Disposal Facility

    Energy Technology Data Exchange (ETDEWEB)

    Casbon, M. A. [CH2M HILL Plateau Remediation Company, Richland, WA (United States); Nichols, W. E. [CH2M HILL Plateau Remediation Company, Richland, WA (United States)

    2017-03-15

    DOE O 435.1, Radioactive Waste Management, and DOE M 435.1-1, Radioactive Waste Management Manual, require that a determination of continued adequacy of the performance assessment (PA), composite analysis (CA), and disposal authorization statement (DAS) be made on an annual basis, and it must consider the results of data collection and analysis from research, field studies, and monitoring. Annual summaries of low-level waste (LLW) disposal operations must be prepared with respect to the conclusions and recommendations of the PA and CA, and a determination of the need to revise the PA or CA must be made. The annual summary requirement provides a structured approach for demonstrating the continued adequacy of the PA and CA in demonstrating a reasonable expectation that the performance objectives will be met. This annual summary addresses only the status of the Environmental Restoration Disposal Facility (ERDF) PA (CP-60089, Performance Assessment for the Environmental Restoration Disposal Facility, Hanford Site, Washington, formerly WCH-520 Rev. 1)1. The CA for ERDF is supported by DOE/RL-2016-62, Annual Status Report (FY 2016): Composite Analysis of Low Level Waste Disposal in the Central Plateau at the Hanford Site. The ERDF PA portion of the CA document is found in Section 3.1.4, and the ERDF operations portion is found in Section 3.3.3.2 of that document.

  9. The use of institutional controls at Department of Energy Oak Ridge Field Office environmental restoration sites

    International Nuclear Information System (INIS)

    White, R.K.; Swindle, D.W.; Redfearn, A.; King, A.D.

    1992-01-01

    This report summarizes some of the major issues related to the use of institutional controls at hazardous waste sites under the auspices of the Department of Energy Field Office, Oak Ridge/Environmental Restoration (DOE-OR/ER) Division. In particular, the report addresses the impacts that assumptions regarding institutional controls have on the results and interpretation of the risk assessment, both in the Remedial Investigation (RI) and the Feasibility Study (FS). Environmental restoration activities at DOE-OR/ER sites are primarily driven by CERCLA. Therefore, the report focuses on the approaches and assumptions relating to institutional controls under CERCLA. Also the report briefly outlines approaches adopted under other authorities such as RCRA and radiation regulatory authorities (such as NRC regulations/guidance, DOE orders, and EPA standards) in order to contrast these approaches to those adopted under CERCLA. In order to demonstrate the implications of the use of institutional controls at DOE facilities, this report summarizes the approaches and results of the recent baseline risk assessment for Solid Waste Storage Area 6 at Oak Ridge National Laboratory. The report concludes with possible options on the use of institutional controls at DOE-OR/ER sites

  10. Site descriptions of environmental restoration units at the Oak Ridge K-25 Site, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Goddard, P.L.; Legeay, A.J.; Pesce, D.S.; Stanley, A.M.

    1995-11-01

    This report, Site Descriptions of Environmental Restoration Units at the Oak Ridge K-25 Site, Oak Ridge, Tennessee, is being prepared to assimilate information on sites included in the Environmental Restoration (ER) Program of the K-25 Site, one of three major installations on the Oak Ridge Reservation (ORR) built during World War III as part of the Manhattan Project. The information included in this report will be used to establish program priorities so that resources allotted to the K-25 ER Program can be best used to decrease any risk to humans or the environment, and to determine the sequence in which any remedial activities should be conducted. This document will be updated periodically in both paper and Internet versions. Units within this report are described in individual data sheets arranged alphanumerically. Each data sheet includes entries on project status, unit location, dimensions and capacity, dates operated, present function, lifecycle operation, waste characteristics, site status, media of concern, comments, and references. Each data sheet is accompanied by a photograph of the unit, and each unit is located on one of 13 area maps. These areas, along with the sub-area, unit, and sub-unit breakdowns within them, are outlined in Appendix A. Appendix B is a summary of information on remote aerial sensing and its applicability to the ER program.

  11. Site descriptions of environmental restoration units at the Oak Ridge K-25 Site, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Goddard, P.L.; Legeay, A.J.; Pesce, D.S.; Stanley, A.M.

    1995-11-01

    This report, Site Descriptions of Environmental Restoration Units at the Oak Ridge K-25 Site, Oak Ridge, Tennessee, is being prepared to assimilate information on sites included in the Environmental Restoration (ER) Program of the K-25 Site, one of three major installations on the Oak Ridge Reservation (ORR) built during World War III as part of the Manhattan Project. The information included in this report will be used to establish program priorities so that resources allotted to the K-25 ER Program can be best used to decrease any risk to humans or the environment, and to determine the sequence in which any remedial activities should be conducted. This document will be updated periodically in both paper and Internet versions. Units within this report are described in individual data sheets arranged alphanumerically. Each data sheet includes entries on project status, unit location, dimensions and capacity, dates operated, present function, lifecycle operation, waste characteristics, site status, media of concern, comments, and references. Each data sheet is accompanied by a photograph of the unit, and each unit is located on one of 13 area maps. These areas, along with the sub-area, unit, and sub-unit breakdowns within them, are outlined in Appendix A. Appendix B is a summary of information on remote aerial sensing and its applicability to the ER program

  12. Preoperational baseline and site characterization report for the Environmental Restoration Disposal Facility

    International Nuclear Information System (INIS)

    Weekes, D.C.; Ford, B.H.; Jaeger, G.K.

    1996-09-01

    This document Volume 2 in a two-volume series that comprise the site characterization report for the Environmental Restoration Disposal Facility. Volume 1 contains data interpretation and information supporting the conclusions in the main text. This document presents original data in support of Volume 1 of the report. The following types of data are presented: well construction reports; borehole logs; borehole geophysical data; well development and pump installation; survey reports; and preoperational baseline chemical data and aquifer test data. This does not represent the entire body of data available. Other types of information are archived at BHI Document Control. Five ground water monitoring wells were drilled at the Environmental Restoration Disposal Facility site to directly investigate site- specific hydrogeologic conditions. Well and borehole activity summaries are presented in Volume 1. Field borehole logs and geophysical data from the drilling are presented in this document. Well development and pump installation sheets are presented for the groundwater monitoring wells. Other data presented in this document include borehole geophysical logs from existing wells; chemical data from the sampling of soil, vegetation, and mammals from the ERDF to support the preoperational baseline; ERDF surface radiation surveys;a nd aquifer testing data for well 699-32-72B

  13. Temas (Version 2.1): Decision Tool for Environmental Restoration: After Nuclear Accidents

    International Nuclear Information System (INIS)

    Vazquez, C.; Moraleda, M.; Montero, M.; Claver, F.

    2001-01-01

    TEMAS (Techniques and Management Strategies for Environmental Restoration) is a user friendly decision aiding computerised system to help in th e selection of the best local strategy of restoration when a post-accidental environmental contamination with long lived radionuclides (''137 Cs, ''134 Cs and ''90 Sr) must be faced. TEMAS provides answer for complex scenarios (urban, agricultural and forest) with different specific levels of contamination, uses and dimensions. The computerized system is structured in three main modules: Databases containing those parameters required to identify and to provide results for typical potential cases of intervention (elemental cases); the evaluation module that uses a limited number of inputs to compose a virtual representation of the real contaminated scenario, in terms of elemental cases, and then calculates the required decision factors (residual individual doses, averted collective doses, costs and other secondary effects after each applicable intervention options); and the decision module which manages these factors according to a certain criteria to select and rank interventions as the recommended strategy. This document describes the contain of the databases, the main calculations of the different procedures and its correlation with databases, schematic draws of the fluxes of calculations, and one simulation of intervention to exemplify inputs and outputs of the system. (Author)

  14. Project Management Support and Services for the Environmental Restoration and Waste Management. Final report

    International Nuclear Information System (INIS)

    1995-01-01

    The Los Alamos National Laboratory (LANL) Environmental Restoration Technical Support Office (ERTSO) contracted Project Time ampersand Cost, Inc. (PT ampersand C) on 16 November 1992 to provide support services to the US Department of Energy (DOE). ERTSO had traditionally supported the DOE Albuquerque office in the Environmental Restoration and Waste Management Programs and had also supported the Office of Waste Management (EM-30) at DOE Headquarters in Germantown, Maryland. PT ampersand C was requested to provide project management and support services for the DOE as well as liaison and coordination of responses and efforts between various agencies. The primary objective of this work was to continue LANL's technical support role to EM-30 and assist in the development of the COE Cost and Schedule Estimating (CASE) Guide for EM-30. PT ampersand C's objectives, as specified in Section B of the contract, were well met during the duration of the project through the review and comment of various draft documents, trips to DOE sites providing program management support and participating in the training for the EM-30 Cost and Schedule Estimating Guide, drafting memos and scheduling future projects, attending numerous meetings with LANL, DOE and other subcontractors, and providing written observations and recommendations.he results obtained were determined to be satisfactory by both the LANL ERTSO and DOE EM-30 organizations. The objective to further the support from LANL and their associated subcontractor (PT ampersand C) was met. The contract concluded with no outstanding issues

  15. Planning environmental restoration in the North Bohemian uranium district, Czech Republic: Progress report 1996

    International Nuclear Information System (INIS)

    Tomas, J.

    1997-01-01

    Uranium ores have been mined in Bohemian Massif in different mining districts i.e. in West Bohemia, Pribram region and Middle Bohemia, Rozna district and in Straz pod Ralskem district. The latter is represented by stratiform sandstone type of deposit where acid in-situ leaching has been applied as mining method since 1968. More than 4 million tons of leaching acids have been injected into the ore bearing sandstones. The district falls in an area of natural water protection in North Bohemian Cretaceous platform. A complex evaluation of negative impact of uranium mining and milling in this area has been clearly articulated in Government Decrees Nos.:366/92, 429/93, 244/95 and 170/96. A special declining regime of mining has been ordered for the implementation of which together with the Government Commission of Experts a remediation programme has been designed and put into operation in 1996. The uranium producer DIAMO a.s. prepared a Concept of Restoration of the area affected by in-situ leaching and MEGA a.s. has prepared the Environmental Impact Assessment (E.I.A.) according to the law No.244/1992. The Ministry of the Environment issued an Environmental Impact Statement which included evaluation of the condition of mining and restoration programme because both activities will influence the environment of the district. (author)

  16. Environmental restoration/waste management-applied technology semiannual report, January--June 1992. Volume 1, No. 1

    Energy Technology Data Exchange (ETDEWEB)

    Adamson, M.; Kline-Simon, K. [eds.

    1992-12-31

    This is the first issue from the Lawrence Livermore National Laboratory of The Environmental Restoration/Waste Management-Applied Technology (ER/WM-AT) Semiannual Report, a continuation of the Advanced Processing Technology (APT) Semiannual Report. The name change reflects the consolidation of the APT Program with the Environmental Restoration and Waste Management Program to form the Environmental Restoration/Waste Management-Applied Technology (ER/WM-AT) Program. The Livermore site mirrors, on a small scale, many of the environmental and waste management problems of the DOE Complex. The six articles in this issue cover incineration- alternative technologies, process development for waste minimization, the proposed Mixed Waste Management Facility, dynamic underground stripping, electrical resistance tomography, and Raman spectroscopy for remote characterization of underground tanks.

  17. Climate change in the four corners and adjacent regions: Implications for environmental restoration and land-use planning

    Energy Technology Data Exchange (ETDEWEB)

    Waugh, W.J. [ed.

    1995-09-01

    This document contains the workshop proceedings on Climate Change in the Four Corners and Adjacent Regions: Implications for Environmental Restoration and Land-Use Planning which took place September 12-14, 1994 in Grand Junction, Colorado. The workshop addressed three ways we can use paleoenvironmental data to gain a better understanding of climate change and its effects. (1) To serve as a retrospective baseline for interpreting past and projecting future climate-induced environmental change, (2) To differentiate the influences of climate and humans on past environmental change, and (3) To improve ecosystem management and restoration practices in the future. The papers presented at this workshop contained information on the following subjects: Paleoclimatic data from the Pleistocene and Holocene epochs, climate change and past cultures, and ecological resources and environmental restoration. Selected papers are indexed separately for inclusion in the Energy Science and Technology Database.

  18. A review of occupational safety and health issues relevant to the Environmental Restoration Program: Selected case histories and associated issues

    International Nuclear Information System (INIS)

    Lesperance, A.M.; Siegel, M.R.; McKinney, M.C.

    1994-08-01

    Since the 1940s, US Department of Energy (DOE) sites have been used for nuclear materials processing and production, warhead testing, and weapons research and development. These activities have resulted in extensive environmental contamination. DOE has established a goal to cleanup and restore the groundwater, soils, sediments, and surface water at its facilities across the nation. To achieve this goal, many workers will be needed to conduct the cleanup. These workers will need training and will be required to follow occupational safety and health (OSH) regulations and guidelines. Compliance with the OSH regulations and guidelines will have an anomous influence on the schedule, money, and technology needed for environmental restoration. Therefore, one area that must be considered in the early stages of long-term planning is the impact of OSH issues on the environmental restoration process. The DOE Office of Environmental Restoration and Waste Management has requested that the Pacific Northwest Laboratory (PNL) investigate the impact of these issues on the environmental restoration process

  19. Environmental assessment of the Environmental Restoration Project at Sandia National Laboratories/New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Sandia National Laboratories/New Mexico (SNL/NM) is managed and operated for the U.S. Department of Energy (DOE) by Sandia Corporation, a subsidiary of the Lockheed Martin Company. SNL/NM is located on land controlled by DOE within the boundaries of Kirtland Air Force Base (KAFB) in Albuquerque, New Mexico. The major responsibilities of SNL/NM are the support of national security and energy projects. This report provides an environmental assessment of proposed remedial action activities at the solid waste management units at SNL/NM. A risk assessment of health hazards is also discussed.

  20. Second annual report of the Environmental Restoration Monitoring and Assessment Program at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Clapp, R.B.; Watts, J.A.

    1993-09-01

    This report summarizes the salient features of the annual efforts of environmental monitoring and field investigations conducted to support the Environmental Restoration (ER) Program at the Oak Ridge National Laboratory (ORNL). This report focuses on the watershed scale, striving to provide an ORNL site-wide perspective on types, distribution, and transport of contamination. Results are used to enhance the conceptual understanding of the key contaminants and the sources, fluxes, and processes affecting their distribution and movement. This report summarizes the efforts of the Waste Area Grouping (WAG) 2 and Site Investigations (SI) program. WAG 2 is the lower portion of the White Oak Creek (WOC) system which drains the major contaminated sites at ORNL and discharges to the Clinch River where public access is allowed. The remedial investigation for WAG 2 includes a long-term multimedia environmental monitoring effort that takes advantage of WAG 2's role as an integrator and conduit of contaminants from the ORNL site. This report also includes information from other site-specific remedial investigations and feasibility studies (RI/FS) for contaminated sites at ORNL and data from other ongoing monitoring programs conducted by other organizations [e.g., the National Pollutant Discharge Elimination System (NPDES) compliance monitoring conducted by the Environmental Surveillance and Protection Section]. This information is included to provide an integrated basis to support ER decision making. This report summarizes information gathered through early 1993. Annual data, such as annual discharges of contaminants, are reported for calendar year 1992

  1. Second annual report of the Environmental Restoration Monitoring and Assessment Program at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Clapp, R.B.; Watts, J.A. [eds.

    1993-09-01

    This report summarizes the salient features of the annual efforts of environmental monitoring and field investigations conducted to support the Environmental Restoration (ER) Program at the Oak Ridge National Laboratory (ORNL). This report focuses on the watershed scale, striving to provide an ORNL site-wide perspective on types, distribution, and transport of contamination. Results are used to enhance the conceptual understanding of the key contaminants and the sources, fluxes, and processes affecting their distribution and movement. This report summarizes the efforts of the Waste Area Grouping (WAG) 2 and Site Investigations (SI) program. WAG 2 is the lower portion of the White Oak Creek (WOC) system which drains the major contaminated sites at ORNL and discharges to the Clinch River where public access is allowed. The remedial investigation for WAG 2 includes a long-term multimedia environmental monitoring effort that takes advantage of WAG 2`s role as an integrator and conduit of contaminants from the ORNL site. This report also includes information from other site-specific remedial investigations and feasibility studies (RI/FS) for contaminated sites at ORNL and data from other ongoing monitoring programs conducted by other organizations [e.g., the National Pollutant Discharge Elimination System (NPDES) compliance monitoring conducted by the Environmental Surveillance and Protection Section]. This information is included to provide an integrated basis to support ER decision making. This report summarizes information gathered through early 1993. Annual data, such as annual discharges of contaminants, are reported for calendar year 1992.

  2. Environmental impacts of abandoned dredged soils and sediments. Available options for their handling, restoration and rehabilitation

    Energy Technology Data Exchange (ETDEWEB)

    Ohimain, E.I. [Rohi Biotechnologies Ltd, Warri, Delta State (Nigeria); Andriesse, W. [Alterra Environmental Sciences, Wageningen Univ. and Research Center, Wageningen (Netherlands); Mensvoort, M.E.F. van [Lab. of Soil Science and Geology, Dept. of Environmental Sciences, Wageningen Univ. and Research Center, Wageningen (Netherlands)

    2004-07-01

    In the process of creating safe navigable waterways for oil exploitation, the companies operating in the Niger Delta generate tons of sulfidic spoils. These are often deposited over bank, mostly upon fringing mangroves, and abandoned. This leads to a myriad of environmental problems. The extent of these impacts is not exactly known, but was inferred from the activities of oil companies operating in the area. This paper describes the impacts following the disturbance of sulfidic sediment through dredging and by subsequent poor spoil management practices. Environmental impacts of exposed and abandoned sulfidic sediments. The practice of dumping and abandoning sulfidic dredged spoils along canal banks triggers a series of environmental problems leading to extreme acidification, heavy metal pollution, and general habitat degradation which prevent the re-colonization of the sites by native species. The resultant spoil dumps remain bare for several years and they become colonized by invasive species later. Later still they may become attractive to the local population as sites for houses, fishing camps and home gardens, which is nevertheless regarded as a positive impact. Management of abandoned sulfidic spoil dumps. As a panacea to environmental problems caused by the sulfidic spoils, they need to be properly handled to prevent their acidification. This should be followed by mangrove restoration to pristine conditions or rehabilitation to other beneficial uses. (orig.)

  3. Oak Ridge Environmental Information System (OREIS): Phase I, System Definition Document. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1992-06-01

    The Phase 1--System Definition Document documents the basis for establishing a consolidated environmental data base and information system for the Department of Energy Oak Ridge Field Office (OR) facilities operated by Martin Marietta Energy Systems, Inc. (Energy Systems). The Automated Data Processing System Development Methodology (ADPSDM), an Energy Systems procedure to assist in developing scientific and technical systems, was used to guide the preparation of the feasibility study and the system requirements definition, both of which are contained in this document. The Feasibility Study (Part 1) documents the existing system and data management practices and establishes and analyzes preliminary alternatives to be considered for the development of a consolidated system, i.e., the Oak Ridge Environmental Information System (OREIS). Alternatives were analyzed for technical and operational feasibility, benefits, and risks. Performance criteria used to rank alternatives included standardization, documentation, robustness, integration, reliability, and predictability. Of the three alternatives studied--request/referral, distributed, and centralized--the centralized system was selected to be most feasible because of its conformance to the performance criteria.

  4. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water.

  5. Standard review plan for the review of environmental restoration remedial action quality assurance program plans

    International Nuclear Information System (INIS)

    1991-09-01

    This plan establishes both the scope of the review and the acceptance criteria to be utilized for the review of Quality Assurance Program Plans (QAPPs) developed in accordance with the requirements of DOE/RL-90-28. DOE/RL-90-28, the Environmental Restoration Remedial Action Quality Assurance Requirements Document (QARD) defines all quality assurance (QA) requirements governing activities that affect the quality of the Environmental Restoration Remedial Action (ERRA) program at the Hanford Site. These requirements are defined in three parts, Part 1 of Quality Management and Administration tasks, Part 2 for Environmental Data Operations, and Part 3 of the Design and Construction of items, systems, and facilities. The purpose of this document is to identify the scope of the review by the DOE Field Office, Richland staff, and establish the acceptance criteria (Parts 1, 2, and 3) that the DOE Field Office, Richland staff will utilize to evaluate the participant QAPPs. Use of the standard review plan will (1) help ensure that participant QAPPs contain the information required by DOE/RL-90-28, (2) aid program participant and DOE Field Office, Richland staff is ensuring that the information describing the participant's QAPP is complete, (3) help persons regarding DOE/RL- 90-28 to locate information, and (4) contribute to decreasing the time needed for the review process. In addition, the Standard Review Plan (SRP) ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate compliance of participant quality programs against DOE/RL-90-28

  6. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water

  7. Community Surveys Low Dose Radiation. Fernald, Ohio and Rocky Flats, Colorado

    CERN Document Server

    Mertz, C K; Johnson, S; MacGregor, D G; Satterfield, T

    2002-01-01

    This report is intended to present a basic description of the data from the two community surveys and to document the text of the questions; the methods used for the survey data collection; and a brief overview of the results. Completed surveys were conducted at local communities near the Rocky Flats, Colorado and the Fernald, Ohio sites; no survey was conducted for the Brookhaven, New York site. Fernald. The Fernald sample was randomly selected from 98% of all potential residential telephones in the townships of Ross, Morgan, and Crosby. The only telephone exchanges not used for the Fernald study had 4%, or fewer, of the holders of the telephone numbers actually living in either of the three target townships. Surveying started on July 24, 2001 and finished on August 30, 2001. A total of 399 completed interviews were obtained resulting in a CASRO response rate of 41.8%. The average length of an interview was 16.5 minutes. Rocky Flats. The sample was randomly selected from all potential residential telephones ...

  8. Environmental Restoration Program project management plan for the DOE Oak Ridge Field Office Major System Acquisition OR-1. Revision 1, Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-01

    In the early 1940s, the Manhattan Project was conducted in a regulatory and operational environment less sophisticated than today. Less was known of the measures needed to protect human health and safety and the environment from the dangers posed by radioactive and hazardous wastes, and experience in dealing with these hazardous materials has grown slowly. Certain hazards were recognized and dealt with from the beginning. However, the techniques used, though standard practices at the time, are now known to have been inadequate. Consequently, the DOE has committed to an aggressive program for cleaning up the environment and has initiated an Environmental Restoration Program involving all its field offices. The objective of this program is to ensure that inactive and surplus DOE facilities and sites meet current standards to protect human health and the environment. The objective of these activities is to ensure that risks posed to human health and safety and the environment by inactive sites and surplus facilities contaminated with radioactive, hazardous, and/or mixed wastes are either eliminated or reduced to prescribed safe levels. This Project Management Plan for Major System Acquisition OR-1 Project documents, communicates, and contributes to the evolution of, the management organizations, systems, and tools necessary to carry out effectively the long-range complex cleanup of the DOE sites on the Oak Ridge Reservation, and at the Paducah, Kentucky, and Piketon, Ohio, uranium enrichment plants managed by the Department of Energy Oak Ridge Field Office; the cleanup of off-site contamination resulting from past releases; and the Decontamination and Decommissioning of surplus DOE facilities at these installations.

  9. Management approaches for environmental restoration at the U.S. Department of Energy Weapons Complex, Savannah River Site: A case study

    International Nuclear Information System (INIS)

    Johnson, S.V.; Mayberry, J.J.

    1993-01-01

    This paper introduces the management approaches for environmental restoration at the US Department of Energy Weapons Complex. A brief chronology of environmental restoration complex-wide is presented. This chronology, which focuses on the changing climate at DOE facilities, is then keyed to activities at the Savannah River Site (SRS) in Aiken, South Carolina, USA. Past, present, and future environmental restoration activities at SRS are discussed, reflecting the change in emphasis at the site

  10. Environmental Restoration Contractor Waste Minimization and Pollution Prevention Plan. Revision 1

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1996-03-01

    This plan contains the Environmental Restoration Contractor (ERC) Waste Minimization and Pollution Prevention (WMin/P2) Program. The plan outlines the activities and schedules developed by the ERC to reduce the quantity and toxicity of waste dispositioned as a result of restoration and remediation activities. This plan satisfies US Department of Energy (DOE) requirements including the Pollution Prevention Awareness program required by DOE Order 5400.1 (DOE 1988). This plan is consistent with Executive Order 12856 and Secretary O'Leary's pollution prevention Policy Statement of December 27, 1994, which set US and DOE pollution prevention policies, respectively. It is also consistent with the DOE Pollution Prevention Crosscut Plan, 1994, which provides guidance in meeting the DOE goals in pollution prevention. The purpose of this plan is to aid ERC projects in meeting and documenting compliance with requirements for WMin/P2. This plan contains the objectives, strategy, and support activities of the ERC Team WMin/P2 program. The basic elements of the plan are pollution prevention goals, waste assessments of major waste streams, implementation of feasible waste minimization opportunities, and a process for reporting achievements. Wherever appropriate, the ERC will integrate the pollution prevention activities in this plan into regular program activities rather than establishing separate WMin/P2 activities. Moreover, wherever possible, existing documents, procedures, and activities will be used to meet WMin/P2 requirements

  11. Stakeholder Interaction in Participatory Land Restoration in Iceland: Environmental Officers' Challenges and Strategies

    Science.gov (United States)

    Berglund, Brita; Hallgren, Lars; Aradóttir, Ása L.

    2015-08-01

    Participatory approaches involve stakeholder interaction but environmental agency employees engaged in participatory undertakings often lack training for interaction tasks. This study explored how district officers at the Soil Conservation Service of Iceland (SCSI) experienced and dealt with stakeholder interaction in participatory land restoration. We made semi-structured interviews with all district officers with at least 1-year experience; seven in total. A thematic content analysis revealed five challenges facing the officers in their interaction activities and seven strategies that they used to deal with these challenges. The core challenge was to establish and maintain contacts with farmers and other stakeholders as it enabled the SCSI to support and influence their land restoration practices. Other challenges were to: accomplish SCSI's objectives; represent the SCSI and the government; have adequate skills, knowledge, and background; and deal with one's own emotions. Four of the strategies seemed to promote collaboration: create win-win scenarios; "go local"; direct and positive communication; and motivation and knowledge sharing. The other strategies: supportive district officer team; self-reliance and personal background; and self-control supported the officers in their interaction tasks. Factors undermining their collaboration efforts included insufficient time and other resources, an unsupportive organizational culture and a legal duty to assess the condition of vegetation cover on farmland. Increased resource allocation to the SCSI's local operations, more attention to emotional issues, and efforts to develop a more flexible and learning organizational culture that supports collaboration could counteract these factors.

  12. Flood protection as a key-component of the environmental restoration of Canal del Dique, Colombia

    Directory of Open Access Journals (Sweden)

    Sokolewicz Marius

    2016-01-01

    Full Text Available Canal del Dique is a man-made distributary of Rio Magdalena. After its widening in 1980’s environmental degradation caused by abundant sediment load and changes to hydrology took a catastrophic form. In 2010, the Canal’s dike breached and 35,000 ha of land were flooded. In 2013 a huge effort to restore the environment in the Canal del Dique system and to flood-proof the villages was started. An integrated approach was adopted to provide an optimal solution for flood control, environment, fresh water supply and navigation. In order to prepare restoration plans, an extensive hydrologic and hydraulic assessment was carried out. 1D, 2D and 3D numerical models were developed to answer different questions, to evaluate different alternatives and to enable selection of optimal solutions. To assess the flood risk, a hindcast of 2010 flood was carried out. A solution was designed in which the inlet of water from the Magdalena River is regulated by a control structure, managed by an automated system based on SCADA and Delft-FEWS flood forecasting software and advanced statistics.

  13. Strategic plan for the utilization of remote sensing technologies in the environmental restoration program

    International Nuclear Information System (INIS)

    King, A.D.; Doll, W.E.; Durfee, R.C.; Luxmoore, R.J.; Conder, S.R.; Nyquist, J.E.

    1993-12-01

    The objectives of the Environmental Restoration (ER) Remote Sensing and Special Surveys Program are to apply state-of-the-art remote sensing and geophysical technologies and to manage routine and remotely-sensed examinations of the Oak Ridge Reservation (ORR), the Paducah Gaseous Diffusion Plant (PGDP), the Portsmouth Gaseous Diffusion Plant (PORTS), and their adjacent off-site areas. Repeated multispectral scanner (MSS) imagery, gamma, and photographic surveys will allow monitoring of the degradation that might occur in waste containment vessels and monitoring (at a later stage in the remediation life cycle) of improvements from restoration efforts and cleanup. These technologies, in combination with geophysical surveys, will provide an effective means for identifying unknown waste sites and contaminant transport pathways. All of the data will be maintained in a data base that will be accessible to site managers in the ER Program. The complete analysis of collected data will provide site-specific data to the ER Program for characterizing and monitoring ER Program hazardous waste sites

  14. Strategic plan for the utilization of remote sensing technologies in the Environmental Restoration Program

    International Nuclear Information System (INIS)

    King, A.D.; Doll, W.E.; Durfee, R.C.; Luxmoore, R.J.; Conder, S.R.; Nyquist, J.E.

    1994-03-01

    The objectives of the Environmental Restoration (ER) Remote Sensing and Special Surveys Program are to apply state-of-the-art remote sensing and geophysical technologies and to manage routine and remotely-sensed examinations of the Oak Ridge Reservation (ORR), the Paducah Gaseous Diffusion Plant (PGDP), the Portsmouth Gaseous Diffusion Plant (PORTS), and their adjacent off-site areas. Repeated multispectral scanner (MSS) imagery, gamma, and photographic surveys will allow monitoring of the degradation that might occur in waste containment vessels and monitoring (at a later stage in the remediation life cycle) of improvements from restoration efforts and cleanup. These technologies, in combination with geophysical surveys, will provide an effective means for identifying unknown waste sites and contaminant transport pathways. All of the data will be maintained in a data base that will be accessible to site managers in the ER Program. The complete analysis of collected data will provide site-specific data to the ER Program for characterizing and monitoring ER Program hazardous waste sites

  15. On-site laboratory support of Oak Ridge National Laboratory environmental restoration field activities

    International Nuclear Information System (INIS)

    Burn, J.L.E.

    1995-07-01

    A remedial investigation/feasibility study has been undertaken at Oak Ridge National Laboratory (ORNL). Bechtel National, Inc. and partners CH2M Hill, Ogden Environmental and Energy Services, and PEER Consultants are contracted to Lockheed Martin Energy Systems, performing this work for ORNL's Environmental Restoration (ER) Program. An on-site Close Support Laboratory (CSL) established at the ER Field Operations Facility has evolved into a laboratory where quality analytical screening results can be provided rapidly (e.g., within 24 hours of sampling). CSL capabilities include three basic areas: radiochemistry, chromatography, and wet chemistry. Radiochemical analyses include gamma spectroscopy, tritium and carbon-14 screens using liquid scintillation analysis, and gross alpha and beta counting. Cerenkov counting and crown-ether-based separation are the two rapid methods used for radiostrontium determination in water samples. By extending count times where appropriate, method detection limits can match those achieved by off-site contract laboratories. Volatile organic compounds are detected by means of gas chromatography using either headspace or purge and trap sample introduction (based on EPA 601/602). Ionic content of water samples is determined using ion chromatography and alkalinity measurement. Ion chromatography is used to quantify both anions (based on EPA 300) and cations. Wet chemistry procedures performed at the CSL include alkalinity, pH (water and soil), soil resistivity, and dissolved/suspended solids. Besides environmental samples, the CSL routinely screens health and safety and waste management samples. The cost savings of the CSL are both direct and indirect

  16. An introductory guide to uncertainty analysis in environmental and health risk assessment. Environmental Restoration Program

    International Nuclear Information System (INIS)

    Hammonds, J.S.; Hoffman, F.O.; Bartell, S.M.

    1994-12-01

    This report presents guidelines for evaluating uncertainty in mathematical equations and computer models applied to assess human health and environmental risk. Uncertainty analyses involve the propagation of uncertainty in model parameters and model structure to obtain confidence statements for the estimate of risk and identify the model components of dominant importance. Uncertainty analyses are required when there is no a priori knowledge about uncertainty in the risk estimate and when there is a chance that the failure to assess uncertainty may affect the selection of wrong options for risk reduction. Uncertainty analyses are effective when they are conducted in an iterative mode. When the uncertainty in the risk estimate is intolerable for decision-making, additional data are acquired for the dominant model components that contribute most to uncertainty. This process is repeated until the level of residual uncertainty can be tolerated. A analytical and numerical methods for error propagation are presented along with methods for identifying the most important contributors to uncertainty. Monte Carlo simulation with either Simple Random Sampling (SRS) or Latin Hypercube Sampling (LHS) is proposed as the most robust method for propagating uncertainty through either simple or complex models. A distinction is made between simulating a stochastically varying assessment endpoint (i.e., the distribution of individual risks in an exposed population) and quantifying uncertainty due to lack of knowledge about a fixed but unknown quantity (e.g., a specific individual, the maximally exposed individual, or the mean, median, or 95%-tile of the distribution of exposed individuals). Emphasis is placed on the need for subjective judgement to quantify uncertainty when relevant data are absent or incomplete

  17. Environmental restoration and waste management five year plan, fiscal years 1994--1998

    International Nuclear Information System (INIS)

    1993-01-01

    In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a ''bottom up'' approach to planning by using Activity Data Sheets to collect financial and technical information at the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE's commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE's environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals

  18. Advanced Monitoring Systems Initiative Project Achievements for Environmental Restoration and Waste Management

    International Nuclear Information System (INIS)

    Hohman, E.H.; Lohrstorfer, C.L.; Venedam, R.J.; Weeks, S.J.; Fannin, C.R.

    2006-01-01

    The Advanced Monitoring Systems Initiative (AMSI) project has been in existence since 2002. In this short time period, AMSI has successfully developed, tested and/or demonstrated over 30 advanced sensors and monitoring systems for applications in environmental restoration, waste management and other areas of national interest. This presentation summarizes the AMSI project, and gives examples of recent successes. The purpose of the presentation is to make Symposium attendees aware of AMSI's capabilities and experience, for possible use in the future. Example successes include the following: - Automated hexavalent chromium (Cr(VI)) monitoring in wells alongside the Columbia River; - Atmospheric chemical sensor array for remote, real-time plume tracking; - Wireless sensor platform for long-term monitoring of subsurface moisture; - Embedded piezo-resistive micro-cantilever (EPM) units for carbon tetrachloride (CCl 4 ) and hydrogen cyanide (HCN) detection; - 'iHistorian' for efficient, real-time data management of chemical releases. (authors)

  19. Clinch River - Environmental Restoration Program (CR-ERP) pilot study, ambient water toxicity

    Energy Technology Data Exchange (ETDEWEB)

    Simbeck, D.J.

    1997-06-01

    Clinch River - Environmental Restoration Program (CR-ERP) personnel and Tennessee Valley Authority (TVA) personnel conducted a pilot study during the week of April 22-29, 1993, prior to initiation of CR-ERP Phase II Sampling and Analysis activities as described in the Statement of Work (SOW) document. The organisms specified for testing were larval fathead minnows, Pimephales promelas, and the daphnid, Ceriodaphnia dubia. Surface water samples were collected by TVA Field Engineering personnel from Clinch River Mile 9.0 and Poplar Creek Kilometer 1.6 on April 21, 23, and 26. Samples were split and provided to the CR-ERP and TVA toxicology laboratories for testing. Exposure of test organisms to these samples resulted in no toxicity (survival, growth, or reproduction) to either species in testing conducted by TVA.

  20. Environmental Restoration Program pollution prevention checklist guide for the feasibility study project phase

    International Nuclear Information System (INIS)

    1993-09-01

    Feasibility studies (FS) determine what remedial alternatives are presented to regulators for site cleanup. A key consideration in this process is the waste to be generated. Minimizing the volume and toxicity of this waste will ultimately contribute to the selection of the best remedial option. The purpose of this checklist guide is to assist the user in incorporating pollution prevention/waste minimization (PP/WM) in all FS phase projects of the Environmental Restoration (ER) Program. This guide will help users document PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to assist users with implementing and evaluating waste reduction. Users can then establish numerical performance measures to measure progress in planning, training, self-assessments, field implementation, documentation, and technology transfer. Cost savings result as users train and assess themselves and perform preliminary waste assessments

  1. Los Alamos National Laboratory Environmental Restoration Project quarterly technical report, April--June 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-18

    This quarterly report describes the technical status of activities in the Los Alamos National Laboratory Environmental Restoration (ER) Project. Each activity is identified by an activity data sheet number, a brief title describing the activity or the technical area where the activity is located, and the name of the project leader. The Hazardous and Solid Waste Amendments (HSWA) portion of the facility operating permit requires the submission of a technical progress report on a quarterly basis. This report, submitted to fulfill the permit`s requirement, summarizes the work performed and the results of sampling and analysis in the ER Project. Suspect waste found include: Radionuclides, high explosives, metals, solvents and organics. The data provided in this report have not been validated. These data are considered ``reviewed data.``

  2. Environmental Restoration and Waste Management manpower needs assessment: US Department of Energy complex

    Energy Technology Data Exchange (ETDEWEB)

    Holmes, C.W.; Lewis, R.E.; Hunt, S.T. (Pacific Northwest Lab., Richland, WA (United States)); Finn, M.G. (Oak Ridge Associated Universities, Inc., TN (United States))

    1992-06-01

    A study was conducted Pacific Northwest Laboratory and Oak Ridge Associated Universities, Inc. to assess the supply and demand for 53 scientific, engineering, and technical occupations relevant to the US Department of Energy's (DOE's) Office of Environmental Restoration and Waste management (EM). These assessments were made by examining budget projections and the input of program/project and human resources managers throughout the DOE complex. Quantitative projections of full-time equivalent employees slots for each occupation have been developed for the 1993--1997 time frame. Qualitative assessments of the factors that affect recruitment, staffing, and retention are also reported. The implications of the study are discussed within the likely skills mix of the future workforce and the education and organization interventions most likely to address the needs of the DOE complex.

  3. Environmental Restoration and Waste Management manpower needs assessment: US Department of Energy complex

    Energy Technology Data Exchange (ETDEWEB)

    Holmes, C.W.; Lewis, R.E.; Hunt, S.T. [Pacific Northwest Lab., Richland, WA (United States); Finn, M.G. [Oak Ridge Associated Universities, Inc., TN (United States)

    1992-06-01

    A study was conducted Pacific Northwest Laboratory and Oak Ridge Associated Universities, Inc. to assess the supply and demand for 53 scientific, engineering, and technical occupations relevant to the US Department of Energy`s (DOE`s) Office of Environmental Restoration and Waste management (EM). These assessments were made by examining budget projections and the input of program/project and human resources managers throughout the DOE complex. Quantitative projections of full-time equivalent employees slots for each occupation have been developed for the 1993--1997 time frame. Qualitative assessments of the factors that affect recruitment, staffing, and retention are also reported. The implications of the study are discussed within the likely skills mix of the future workforce and the education and organization interventions most likely to address the needs of the DOE complex.

  4. Environmental restoration and waste management department independent safety review committee program management plan

    Energy Technology Data Exchange (ETDEWEB)

    1992-10-01

    This Program Management Plan (PMP) describes and governs the Independent Safety Review Committee (ISRC) established within the Environmental Restoration and Waste Management Department (ER WMD). The ISRC performs independent safety reviews for the ER WMD as required and specified by the governing documents mentioned above. This PMP defines the ISRC organization, work plan, and scope of work. The PMP is organized consistent with the requirements of DOE Order 4700.1, Project Management System. For the purpose of readability, this document shall use the term program'' to include not only the chartered activities of the ISRC, but also the related activities conducted by the chairman and staff. This PMP is subordinate to the ER WMD Implementing Program Management Plan, EGG-WM-10220.

  5. Environmental restoration and waste management department independent safety review committee program management plan

    Energy Technology Data Exchange (ETDEWEB)

    1992-10-01

    This Program Management Plan (PMP) describes and governs the Independent Safety Review Committee (ISRC) established within the Environmental Restoration and Waste Management Department (ER&WMD). The ISRC performs independent safety reviews for the ER&WMD as required and specified by the governing documents mentioned above. This PMP defines the ISRC organization, work plan, and scope of work. The PMP is organized consistent with the requirements of DOE Order 4700.1, Project Management System. For the purpose of readability, this document shall use the term ``program`` to include not only the chartered activities of the ISRC, but also the related activities conducted by the chairman and staff. This PMP is subordinate to the ER&WMD Implementing Program Management Plan, EGG-WM-10220.

  6. International technology transfer to support the environmental restoration needs of the DOE complex

    International Nuclear Information System (INIS)

    DuCharme, A.R.; Jimenez, R.D.; Roberds, W.J.

    1992-01-01

    One of the principal objectives of the International Technology Exchange Program (ITEP) is the exchange of waste management and environmental restoration (WM/ER) technologies between the US and other nations. The current emphasis of ITEP is the transfer of technologies to the US that could provide better, faster, cheaper, or safer solutions to the needs of the DOE complex. The 10 candidate technologies that have been identified thus far by ITEP are discussed. The highlights of preliminary evaluations of these technologies through a systems approach are also described. The technologies have been evaluated by a screening process to determine their applicability to the leading WM/ER needs of the DOE complex. The technologies have been qualitatively compared with the known or anticipated capabilities of domestic, base case technologies

  7. On-site vs off-site management of environmental restoration waste: A cost effectiveness analysis

    International Nuclear Information System (INIS)

    Morse, M.A.; Aamodt, P.L.; Cox, W.B.

    1996-01-01

    The Sandia National Laboratories Environmental Restoration Project is expected to generate relatively large volumes of hazardous waste as a result of cleanup operations. These volumes will exceed the Laboratories existing waste management capacity. This paper presents four options for managing remediation wastes, including three alternatives for on-site waste management utilizing a corrective action management unit (CAMU). Costs are estimated for each of the four options based on current volumetric estimates of hazardous waste. Cost equations are derived for each of the options with the variables being waste volumes, the major unknowns in the analysis. These equations provide a means to update cost estimates as volume estimates change. This approach may be helpful to others facing similar waste management decisions

  8. Application of the observational approach to environmental restoration at the Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Garland, S.B. II; Holm, L.A.; Riddle, S.P.

    1992-07-01

    Martin Marietta Energy Systems, Inc., (Energy Systems) manages the Oak Ridge National Laboratory (ORNL) for the US Department of Energy (DOE). Since ORNL's beginning in the 1940's, a variety of solid and liquid low-level radioactive waste, hazardous waste, and mixed waste has been generated. These wastes primarily have been disposed of on-site by shallow land burial, which has caused the contamination of soil, surface water, sediments, and groundwater. The Environmental Restoration Program (ERP) was initiated to remediate this legacy of contamination and to eliminate the associated risk to the public and the environment. In an effort to streamline the process and accelerate remediation activities, DOE, EPA, and TDEC agreed to utilize the Observational Approach in order to reduce time and cost and to use limited resources more effectively and efficiently. This paper briefly explains the Observational Approach, discusses its use in long-range planning and Remedial Investigations, and describes several specific applications

  9. ANL Technical Support Program for DOE Environmental Restoration and Waste Management

    International Nuclear Information System (INIS)

    Bates, J.K.; Bradley, C.R.; Buck, E.C.; Cunnane, J.C.; Dietz, N.L.; Ebert, W.L.; Emery, J.W.; Feng, X.; Gerding, T.J.; Gong, M.; Hoh, J.C.; Mazer, J.J.; Wronkiewicz, D.J.; Bourcier, W.L.; Morgan, L.E.; Nielsen, J.K.; Steward, S.A.; Ewing, R.C.; Wang, L.M.; Han, W.T.; Tomozawa, M.

    1992-03-01

    This report provides an overview of progress during FY 1991 for the Technical Support Program that is part of the ANL Technology Support Activity for DOE, Environmental Restoration and Waste Management (EM). The purpose is to evaluate, before hot start-up of the Defenses Waste Processing Facility (DWPF) and the West Valley Demonstration Project (WVDP), factors that are likely to affect glass reaction in an unsaturated environment typical of what may be expected for the candidate Yucca Mountain repository site. Specific goals for the testing program include the following: (1) to review and evaluate available information on parameters that will be important in establishing the long-term performance of glass in a repository environment; (2) to perform testing to further quantify the effects of important variables where there are deficiencies in the available data; and (3) to initiate long-term testing that will bound glass performance under a range of conditions applicable to repository disposal

  10. Independent technical review of the Sandia National Laboratories Environmental Restoration Project

    International Nuclear Information System (INIS)

    1994-11-01

    An Independent Technical Review was conducted of the Environmental Restoration Project. The objective of the review was recommendations, from a commercial perspective, on a systems level path forward to safe, minimum cost and schedule project completion. The work presented represents the consensus analysis and recommendations of thirteen individuals with varied backgrounds, expertise, and experience. The ITR team recommends that the barriers to the opportunity described in the diagnosis be eliminated using an integrated DOE-Sandia system approach. Piecemeal changes will not result in the desired commercial efficiency. DOE needs to operate as the contracting agency for a Major System Acquisition. If it does not, commercial performance will not be achieved regardless of the contractor. Likewise, Sandia needs to establish and implement the necessary project structure and management systems to operate with commercial contractor like efficiency

  11. Idaho National Engineering Laboratory (INEL) Environmental Restoration (ER) Program Baseline Safety Analysis File (BSAF)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The Baseline Safety Analysis File (BSAF) is a facility safety reference document for the Idaho National Engineering Laboratory (INEL) environmental restoration activities. The BSAF contains information and guidance for safety analysis documentation required by the U.S. Department of Energy (DOE) for environmental restoration (ER) activities, including: Characterization of potentially contaminated sites. Remedial investigations to identify and remedial actions to clean up existing and potential releases from inactive waste sites Decontamination and dismantlement of surplus facilities. The information is INEL-specific and is in the format required by DOE-EM-STD-3009-94, Preparation Guide for U.S. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports. An author of safety analysis documentation need only write information concerning that activity and refer to BSAF for further information or copy applicable chapters and sections. The information and guidance provided are suitable for: {sm_bullet} Nuclear facilities (DOE Order 5480-23, Nuclear Safety Analysis Reports) with hazards that meet the Category 3 threshold (DOE-STD-1027-92, Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports) {sm_bullet} Radiological facilities (DOE-EM-STD-5502-94, Hazard Baseline Documentation) Nonnuclear facilities (DOE-EM-STD-5502-94) that are classified as {open_quotes}low{close_quotes} hazard facilities (DOE Order 5481.1B, Safety Analysis and Review System). Additionally, the BSAF could be used as an information source for Health and Safety Plans and for Safety Analysis Reports (SARs) for nuclear facilities with hazards equal to or greater than the Category 2 thresholds, or for nonnuclear facilities with {open_quotes}moderate{close_quotes} or {open_quotes}high{close_quotes} hazard classifications.

  12. Natural resource risk and cost management in environmental restoration: Demonstration project at the Savannah River Site

    International Nuclear Information System (INIS)

    Bascietto, J.J.; Sharples, F.E.

    1995-01-01

    The US Department of Energy (DOE) is both a trustee for the natural resources present on its properties and the lead response agency under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). As such, DOE is addressing the destruction or loss of those resources caused by releases of hazardous substances from its facilities (DOE 1991) and collecting data to be used in determining the extent of contamination at its facilities, estimating risks to human health and the environment, and selecting appropriate remedial actions. The remedial investigation/feasibility study (RI/FS) process is used to investigate sites and select remedial actions. A Natural Resource Damage Assessment (NRDA) process may be used to determine whether natural resources have also been injured by the released hazardous substances and to calculate compensatory monetary damages to be used to restore the natural resources. In FY 1994, the Savannah River Site (SRS) was chosen to serve as a demonstration site for testing the integrated NRDA framework and demonstrating how NRDA concerns might be integrated into the environmental restoration activities of an actual site that is characteristically large and complex. The demonstration project (1) provided a means to illustrate the use of complex analyses using real information on the specific natural resources of the SRS; (2) served as a vehicle for reinforcing and expanding the SRS staff's understanding of the links between the NRDA and RI/FS processes; (3) provided a forum for the discussion of strategic issues with SRS personnel; and (4) allowed the refining and elaboration of DOE guidance by benchmarking the theoretical process using real information and issues

  13. Idaho National Engineering Laboratory (INEL) Environmental Restoration (ER) Program Baseline Safety Analysis File (BSAF)

    International Nuclear Information System (INIS)

    1995-09-01

    The Baseline Safety Analysis File (BSAF) is a facility safety reference document for the Idaho National Engineering Laboratory (INEL) environmental restoration activities. The BSAF contains information and guidance for safety analysis documentation required by the U.S. Department of Energy (DOE) for environmental restoration (ER) activities, including: Characterization of potentially contaminated sites. Remedial investigations to identify and remedial actions to clean up existing and potential releases from inactive waste sites Decontamination and dismantlement of surplus facilities. The information is INEL-specific and is in the format required by DOE-EM-STD-3009-94, Preparation Guide for U.S. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports. An author of safety analysis documentation need only write information concerning that activity and refer to BSAF for further information or copy applicable chapters and sections. The information and guidance provided are suitable for: sm-bullet Nuclear facilities (DOE Order 5480-23, Nuclear Safety Analysis Reports) with hazards that meet the Category 3 threshold (DOE-STD-1027-92, Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports) sm-bullet Radiological facilities (DOE-EM-STD-5502-94, Hazard Baseline Documentation) Nonnuclear facilities (DOE-EM-STD-5502-94) that are classified as open-quotes lowclose quotes hazard facilities (DOE Order 5481.1B, Safety Analysis and Review System). Additionally, the BSAF could be used as an information source for Health and Safety Plans and for Safety Analysis Reports (SARs) for nuclear facilities with hazards equal to or greater than the Category 2 thresholds, or for nonnuclear facilities with open-quotes moderateclose quotes or open-quotes highclose quotes hazard classifications

  14. Natural resource risk and cost management in environmental restoration: Demonstration project at the Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Bascietto, J.J. [USDOE, Washington, DC (United States); Sharples, F.E. [Oak Ridge National Lab., TN (United States). Environmental Sciences Div.

    1995-12-31

    The US Department of Energy (DOE) is both a trustee for the natural resources present on its properties and the lead response agency under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). As such, DOE is addressing the destruction or loss of those resources caused by releases of hazardous substances from its facilities (DOE 1991) and collecting data to be used in determining the extent of contamination at its facilities, estimating risks to human health and the environment, and selecting appropriate remedial actions. The remedial investigation/feasibility study (RI/FS) process is used to investigate sites and select remedial actions. A Natural Resource Damage Assessment (NRDA) process may be used to determine whether natural resources have also been injured by the released hazardous substances and to calculate compensatory monetary damages to be used to restore the natural resources. In FY 1994, the Savannah River Site (SRS) was chosen to serve as a demonstration site for testing the integrated NRDA framework and demonstrating how NRDA concerns might be integrated into the environmental restoration activities of an actual site that is characteristically large and complex. The demonstration project (1) provided a means to illustrate the use of complex analyses using real information on the specific natural resources of the SRS; (2) served as a vehicle for reinforcing and expanding the SRS staff`s understanding of the links between the NRDA and RI/FS processes; (3) provided a forum for the discussion of strategic issues with SRS personnel; and (4) allowed the refining and elaboration of DOE guidance by benchmarking the theoretical process using real information and issues.

  15. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedial Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word.

  16. GIS environmental information analysis of the Darro River basin as the key for the management and hydrological forest restoration.

    Science.gov (United States)

    Fernandez, Paz; Delgado, Expectación; Lopez-Alonso, Mónica; Poyatos, José Manuel

    2018-02-01

    This article presents analyses of soil and environmental information for the Darro River basin (Granada-Spain) preliminary to its hydrological and forestry restoration. These analyses were carried out using a geographical information system (GIS) and employing a new procedure that adapts hydrological forest-restoration methods. The complete analysis encompasses morphological conditions, soil and climate characteristics as well as vegetation and land use. The study investigates soil erosion in the basin by using Universal Soil Loss Equation (USLE) and by mapping erosion fragility units. The results are presented in a set of maps and their analysis, providing the starting point for river basin management and the hydrological and forestry-restoration project that was approved at the end of 2015. The presence of soft substrates (e.g. gravel and sand) indicates that the area is susceptible to erosion, particularly the areas that are dominated by human activity and have little soil protection. Finally, land use and vegetation cover were identified as key factors in the soil erosion in the basin. According to the results, river authorities have included several measures in the restoration project aimed at reducing the erosion and helping to recover the environmental value of this river basin and to include it in recreation possibilities for the community of Granada. The presented analytical approach, designed by the authors, would be useful as a tool for environmental restoration in other small Mediterranean river basins. Copyright © 2017 Elsevier B.V. All rights reserved.

  17. Environmental restoration activities at the US Department of Energy's Pinellas Plant

    International Nuclear Information System (INIS)

    Parker, M.W.

    1991-01-01

    The Pinellas Plant, located in Largo, Florida, is part of the US Department of Energy's (DOE) weapons complex. GE Neutron Devices (GEND) has initiated an extremely aggressive, proactive Environmental Restoration (ER) Program at the Pinellas Plant. The ER program was started by AL to investigate environmental concerns associated with past waste management practices and procedures at DOE weapons installations. The Pinellas Plant has been involved with ER activities since the mid 1980's when the DOE's Pinellas Area Office (PAO) entered a voluntary cleanup agreement with the Florida Department of Environmental Regulation (FDER). The agreement was for the remediation of an adjacent parcel of property previously owned, and used for disposal of drums containing waste solvents and resins. Remediation issues at the Pinellas Plant are equivalent to those experienced by many private industries; for example, limited volatile organic compound (VOC) and heavy metal contamination of the surficial aquifer system and heavy metal contamination of soils. ER activities in progress are aimed toward: confining, repositioning and remedying areas of heavy metal and VOC contaminants found within the surficial aquifer system; consistency with EPA's draft Corrective Action rules which state ''the corrective action program will be to expedite cleanup results by requiring (taking) sensible early action to control environmental problems;'' protection of a US Department of Interior (DOI) designated national wetland; and to ensure that risk to human health and safety and to the environment posed by the plants past, present and future operations are either eliminated or reduced to acceptable, safe levels. This paper will summarize the progress made and the strategies of the Pinellas Plant ER program as well as implementation of interim remedial actions

  18. The prevention of the need for environmental restoration within the Romanian nuclear energy production sector

    International Nuclear Information System (INIS)

    Andrei, V.; Rotaru, I.; Glodeanu, F.

    1999-01-01

    In Romania, the nuclear research activities carried out in the past did not generate large amounts of radioactive wastes. The old industrial activities, especially in the field of uranium mining, and the poor waste management practices do not pose an immediate threat to the surrounding environment, but they should become subject for improving the nuclear safety and implementation of potential remediation actions to release the site in reasonable acceptable conditions. For a country with low economical resources such as Romania, the co-operation in the field of the safe management of radioactive wastes and environmental restoration should be a priority. In order to follow the best practices and to implement safe and proven technologies, we count on the information from the international experience. Information on the bad practices is also important in order to not repeat costly mistakes in economic, radiological or environmental terms. Currently, the mode of co-operation with maximum benefits for Romania is through the international organizations such as the Commission of European Communities (CEC), the International Atomic Energy Agency and the Organization for Economic Co-operation and Development/Nuclear Energy Agency which is playing a major role in this area. Thus, the cooperation and information exchange could help Romania to validate the national approach and to check its own progress. As Romania became an user of nuclear power since 1996, it was appreciated from the very beginning of the plant lifetime that a special attention has to be paid to prevention and minimization of the radioactive waste generation. Thus, from environmental point of view, it would be more beneficial to promote a policy to prevent and minimize the environmental impact of potential contamination of nuclear sites. (author)

  19. Interagency Review of the Department of Energy Environmental Restoration and Waste Management Program

    International Nuclear Information System (INIS)

    1992-01-01

    This report presents the findings of the Interagency Requirements Review of the Department of Energy (DOE) Environmental Restoration and Waste Management (ERWM) Program. The review was requested by Admiral Watkins to help determine the FY 1993 funding levels necessary to meet all legal requirements. The review was undertaken by analysts from the Office of Management and Budget (OMB) and Army Corps of Engineers, reporting to an Interagency Group (IAG) of senior Administration officials concerned with environmental cleanup issues. The purpose of the study was to determine the level of finding needed in FY 1993 for each ERWM Field Office to comply with all Federal, State, and local government legal requirements; all DOE Orders that establish standards for environment, safety and health (ES and H) management; and for prudent investments in other discretionary and management activities such as upgrading administrative buildings, information systems, etc. The study also reviewed the cost estimates supporting the ERWM proposed budget, including direct costs (labor, equipment) and indirect costs (administrative, landlord services, contractor overhead). The study did not analyze whether the Federal/State legal requirements and DOE Orders were necessary or whether the proposed clean-up remedies represent the most cost effective alternatives available

  20. Idaho National Engineering Laboratory Environmental Restoration Program Schedule Contingency Evaluation Report

    International Nuclear Information System (INIS)

    1993-09-01

    This report represents the schedule contingency evaluation done on the FY-93 Major System Acquisition (MSA) Baseline for the Idaho National Engineering Laboratory's (INEL) Environmental Restoration Program (EPP). A Schedule Contingency Evaluation Team (SCET) was established to evaluate schedule contingency on the MSA Baseline for the INEL ERP associated with completing work within milestones established in the baseline. Baseline schedules had been established considering enforceable deadlines contained in the Federal Facilities Agreement/Consent Order (FFA/CO), the agreement signed in 1992, by the State of Idaho, Department of Health ampersand Welfare, the U.S. Environmental Protection Agency, Region 10, and the U.S. Department of Energy, Idaho Operations Office. The evaluation was based upon the application of standard schedule risk management techniques to the specific problems of the INEL ERP. The schedule contingency evaluation was designed to provided early visibility for potential schedule delays impacting enforceable deadlines. The focus of the analysis was on the duration of time needed to accomplish all required activities to achieve completion of the milestones in the baseline corresponding to the enforceable deadlines. Additionally, the analysis was designed to identify control of high-probability, high-impact schedule risk factors

  1. Waste management/waste certification plan for the Oak Ridge National Laboratory Environmental Restoration Program

    International Nuclear Information System (INIS)

    Clark, C. Jr.; Hunt-Davenport, L.D.; Cofer, G.H.

    1995-03-01

    This Waste Management/Waste Certification (C) Plan, written for the Environmental Restoration (ER) Program at Oak Ridge National Laboratory (ORNL), outlines the criteria and methodologies to be used in the management of waste generated during ORNL ER field activities. Other agreed upon methods may be used in the management of waste with consultation with ER and Waste Management Organization. The intent of this plan is to provide information for the minimization, handling, and disposal of waste generated by ER activities. This plan contains provisions for the safe and effective management of waste consistent with the U.S. Environmental Protection Agency's (EPA's) guidance. Components of this plan have been designed to protect the environment and the health and safety of workers and the public. It, therefore, stresses that investigation derived waste (IDW) and other waste be managed to ensure that (1) all efforts be made to minimize the amount of waste generated; (2) costs associated with sampling storage, analysis, transportation, and disposal are minimized; (3) the potential for public and worker exposure is not increased; and (4) additional contaminated areas are not created

  2. Interagency Review of the Department of Energy Environmental Restoration and Waste Management Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-04-29

    This report presents the findings of the Interagency Requirements Review of the Department of Energy (DOE) Environmental Restoration and Waste Management (ERWM) Program. The review was requested by Admiral Watkins to help determine the FY 1993 funding levels necessary to meet all legal requirements. The review was undertaken by analysts from the Office of Management and Budget (OMB) and Army Corps of Engineers, reporting to an Interagency Group (IAG) of senior Administration officials concerned with environmental cleanup issues. The purpose of the study was to determine the level of finding needed in FY 1993 for each ERWM Field Office to comply with all Federal, State, and local government legal requirements; all DOE Orders that establish standards for environment, safety and health (ES and H) management; and for prudent investments in other discretionary and management activities such as upgrading administrative buildings, information systems, etc. The study also reviewed the cost estimates supporting the ERWM proposed budget, including direct costs (labor, equipment) and indirect costs (administrative, landlord services, contractor overhead). The study did not analyze whether the Federal/State legal requirements and DOE Orders were necessary or whether the proposed clean-up remedies represent the most cost effective alternatives available.

  3. Waste management/waste certification plan for the Oak Ridge National Laboratory Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Clark, C. Jr.; Hunt-Davenport, L.D.; Cofer, G.H.

    1995-03-01

    This Waste Management/Waste Certification (C) Plan, written for the Environmental Restoration (ER) Program at Oak Ridge National Laboratory (ORNL), outlines the criteria and methodologies to be used in the management of waste generated during ORNL ER field activities. Other agreed upon methods may be used in the management of waste with consultation with ER and Waste Management Organization. The intent of this plan is to provide information for the minimization, handling, and disposal of waste generated by ER activities. This plan contains provisions for the safe and effective management of waste consistent with the U.S. Environmental Protection Agency`s (EPA`s) guidance. Components of this plan have been designed to protect the environment and the health and safety of workers and the public. It, therefore, stresses that investigation derived waste (IDW) and other waste be managed to ensure that (1) all efforts be made to minimize the amount of waste generated; (2) costs associated with sampling storage, analysis, transportation, and disposal are minimized; (3) the potential for public and worker exposure is not increased; and (4) additional contaminated areas are not created.

  4. Guidance document for the preparation of waste management plans for the Environmental Restoration Program at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Clark, C. Jr.

    1993-07-01

    A project waste management (WM) plan is required for all Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program remedial investigation, decommission and decontamination (D ampersand D), and remedial action (RA) activities. The project WM plan describes the strategy for handling, packaging, treating, transporting, characterizing, storing, and/or disposing of waste produced as part of ORNL ER Program activities. The project WM plan also contains a strategy for ensuring worker and environmental protection during WM activities

  5. Environmental Impact Assessment of reservoir construction: new perspectives for restoration economy, and development: the Belo Monte Power Plant case study.

    Science.gov (United States)

    Tundisi, J G; Matsumura-Tundisi, T; Tundisi, J E M

    2015-08-01

    The Environmental Impact Assessment of reservoir construction can be viewed as a new strategic perspective for the economic development of a region. Based on the principles of a watershed approach a interdisciplinary and multidisciplinary systemic view including biogeophysiographical, economic and socio environmental studies the new vision of a EIA provides a basic substratum for the restoration economy and an advanced model for the true development much well ahead of the modernization aspects of the project of a reservoir construction.

  6. STREAMLINED APPROACH FOR ENVIRONMENTAL RESTORATION PLAN FOR CORRECTIVE ACTION UNIT 116: AREA 25 TEST CELL C FACILITYNEVADA TEST SITE, NEVADA

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    This Streamlined Approach for Environmental Restoration Plan identifies the activities required for the closure of Corrective Action Unit 116, Area 25 Test Cell C Facility. The Test Cell C Facility is located in Area 25 of the Nevada Test Site approximately 25 miles northwest of Mercury, Nevada.

  7. Summary of the landfill remediation problems and technology needs of the Oak Ridge Reservation Environmental Restoration Programs

    International Nuclear Information System (INIS)

    1991-01-01

    This report discusses the following topics: brief description of the Oak Ridge Reservation Environmental Restoration Program; descriptions of representative waste burials at each site; ongoing, planned, or potential remediation; known or anticipated remediation problems; potential applications for robotics in the remediation of Oak Ridge Reservation landfills

  8. Preliminary standard review guide for Environmental Restoration/Decontamination and Decommissioning safety analyses

    International Nuclear Information System (INIS)

    Ellingson, D.R.

    1993-06-01

    The review guide is based on the shared experiences, approaches, and philosophies of the Environmental Restoration/Decontamination and Decommissioning (ER/D ampersand D) subgroup members. It is presented in the form of a review guide to maximize the benefit to both the safety analyses practitioner and reviewer. The guide focuses on those challenges that tend to be unique to ER/D ampersand D cleanup activities. Some of these experiences, approaches, and philosophies may find application or be beneficial to a broader spectrum of activities such as terminal cleanout or even new operations. Challenges unique to ER/D ampersand D activities include (1) consent agreements requiring activity startup on designated dates; (2) the increased uncertainty of specific hazards; and (3) the highly variable activities covered under the broad category of ER/D ampersand D. These unique challenges are in addition to the challenges encountered in all activities; e.g., new and changing requirements and multiple interpretations. The experiences in approaches, methods, and solutions to the challenges are documented from the practitioner and reviewer's perspective, thereby providing the viewpoints on why a direction was taken and the concerns expressed. Site cleanup consent agreements with predetermined dates for restoration activity startup add the dimension of imposed punitive actions for failure to meet the date. Approval of the safety analysis is a prerequisite to startup. Actions that increase expediency are (1) assuring activity safety; (2) documenting that assurance; and (3) acquiring the necessary approvals. These actions increase the timeliness of startup and decrease the potential for punitive action. Improvement in expediency has been achieved by using safety analysis techniques to provide input to the line management decision process rather than as a review of line management decisions. Expediency is also improved by sharing the safety input and resultant decisions with

  9. Draft Waste Management Programmatic Environmental Impact Statement for managing treatment, storage, and disposal of radioactive and hazardous waste. Volume 3, Appendix A: Public response to revised NOI, Appendix B: Environmental restoration, Appendix C, Environmental impact analysis methods, Appendix D, Risk

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    Volume three contains appendices for the following: Public comments do DOE`s proposed revisions to the scope of the waste management programmatic environmental impact statement; Environmental restoration sensitivity analysis; Environmental impacts analysis methods; and Waste management facility human health risk estimates.

  10. Environmental restoration risk-based prioritization work package planning and risk ranking methodology. Revision 2

    International Nuclear Information System (INIS)

    Dail, J.L.; Nanstad, L.D.; White, R.K.

    1995-06-01

    This document presents the risk-based prioritization methodology developed to evaluate and rank Environmental Restoration (ER) work packages at the five US Department of Energy, Oak Ridge Field Office (DOE-ORO) sites [i.e., Oak Ridge K-25 Site (K-25), Portsmouth Gaseous Diffusion Plant (PORTS), Paducah Gaseous Diffusion Plant (PGDP), Oak Ridge National Laboratory (ORNL), and the Oak Ridge Y-12 Plant (Y-12)], the ER Off-site Program, and Central ER. This prioritization methodology was developed to support the increased rigor and formality of work planning in the overall conduct of operations within the DOE-ORO ER Program. Prioritization is conducted as an integral component of the fiscal ER funding cycle to establish program budget priorities. The purpose of the ER risk-based prioritization methodology is to provide ER management with the tools and processes needed to evaluate, compare, prioritize, and justify fiscal budget decisions for a diverse set of remedial action, decontamination and decommissioning, and waste management activities. The methodology provides the ER Program with a framework for (1) organizing information about identified DOE-ORO environmental problems, (2) generating qualitative assessments of the long- and short-term risks posed by DOE-ORO environmental problems, and (3) evaluating the benefits associated with candidate work packages designed to reduce those risks. Prioritization is conducted to rank ER work packages on the basis of the overall value (e.g., risk reduction, stakeholder confidence) each package provides to the ER Program. Application of the methodology yields individual work package ''scores'' and rankings that are used to develop fiscal budget requests. This document presents the technical basis for the decision support tools and process

  11. The Charles River, Eastern Massachusetts: Scientific Information in Support of Environmental Restoration

    Science.gov (United States)

    Weiskel, Peter K.

    2007-01-01

    Human activity has profoundly altered the Charles River and its watershed over the past 375 years. Restoration of environmental quality in the watershed has become a high priority for private- and public-sector organizations across the region. The U.S. Environmental Protection Agency and the Massachusetts Executive Office of Environmental Affairs worked together to coordinate the efforts of the various organizations. One result of this initiative has been a series of scientific studies that provide critical information concerning some of the major hydrologic and ecological concerns in the watershed. These studies have focused upon: * Streamflows - Limited aquifer storage, growing water demands, and the spread of impervious surfaces are some of the factors exacerbating low summer streamflows in headwater areas of the watershed. Coordinated management of withdrawals, wastewater returns, and stormwater runoff could substantially increase low streamflows in the summer. Innovative approaches to flood control, including preservation of upstream wetland storage capacity and construction of a specially designed dam at the river mouth, have greatly reduced flooding in the lower part of the watershed in recent decades. * Water quality - Since the mid-1990s, the bacterial quality of the Charles River has improved markedly, because discharges from combined sewer overflows and the number of illicit sewer connections to municipal storm drains have been reduced. Improved management of stormwater runoff will likely be required, however, for full attainment of State and Federal water-quality standards. Phosphorus inputs from a variety of sources remain an important water-quality problem. * Fish communities and habitat quality - The Charles River watershed supports a varied fish community of about 20 resident and migratory species. Habitat conditions for fish and other aquatic species have improved in many parts of the river system in recent years. However, serious challenges remain

  12. Site descriptions of environmental restoration units at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Kuhaida, A.J. Jr.; Parker, A.F.

    1997-02-01

    This report provides summary information on Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) sites as listed in the Oak Ridge Reservation Federal Facility Agreement (FFA), dated January 1, 1992, Appendix C. The Oak Ridge National Laboratory was built in 1943 as part of the World War II Manhattan Project. The original mission of ORNL was to produce and chemically separate the first gram-quantities of plutonium as part of the national effort to produce the atomic bomb. The current mission of ORNL is to provide applied research and development in support of the U.S. Department of Energy (DOE) programs in nuclear fusion and fission, energy conservation, fossil fuels, and other energy technologies and to perform basic scientific research in selected areas of the physical, life, and environmental sciences. ER is also tasked with clean up or mitigation of environmental impacts resulting from past waste management practices on portions of the approximately 37,000 acres within the Oak Ridge Reservation (ORR). Other installations located within the ORR are the Gaseous Diffusion Plant (K-25) and the Y-12 plant. The remedial action strategy currently integrates state and federal regulations for efficient compliance and approaches for both investigations and remediation efforts on a Waste Area Grouping (WAG) basis. As defined in the ORR FFA Quarterly Report July - September 1995, a WAG is a grouping of potentially contaminated sites based on drainage area and similar waste characteristics. These contaminated sites are further divided into four categories based on existing information concerning whether the data are generated for scoping or remedial investigation (RI) purposes. These areas are as follows: (1) Operable Units (OU); (2) Characterization Areas (CA); (3) Remedial Site Evaluation (RSE) Areas; and (4) Removal Site Evaluation (RmSE) Areas.

  13. Preparing for the future: Higher education meeting environmental restoration and waste management human resource needs

    International Nuclear Information System (INIS)

    Wohlpart, Alfred

    1992-01-01

    The Office of Environmental Restoration and Waste Management (ER/WM) of the U.S. Department of Energy (DOE) has as its goal the elimination of risks from hazardous waste to human health and safety and the environment or the reduction of these risks to prescribed safe levels. The achievement of this goal requires the availability of sufficient and appropriately educated scientists, engineers, and technicians. A preliminary workforce needs assessment conducted for the Office of Environmental Restoration and Waste Management in 1990 indicated that the technical workforce involved in ER/WM activities would grow by 50 to 70 percent by 1995. A more exhaustive assessment is currently underway. To ensure the availability of the necessary human resources, the Office has initiated a series of education programs. The programs designed for the college/university levels are expected to increase the number of students pursuing associate, baccalaureate, and advanced degrees in ER/WM relevant science and engineering disciplines and to initiate research and training in technical areas supportive of the ER/WM mission. The ER/WM Scholarship program provides scholarships to undergraduate students pursuing science and engineering degrees at designated two- and four-year academic institutions. Fifty-four four-year and six two-year institutions are involved. The ER/WM Fellowship program supports graduate study and research at designated academic institutions in specified science and engineering disciplines or in interdisciplinary programs, Thirty graduate students are pursuing advanced degrees in disciplines supportive of the ER/WM mission at 14 different academic institutions. Scholars and fellows are required to spend one summer at a DOE facility participating in ongoing ER/WM projects. The fellowship and scholarship programs are expected to create a pool of appropriately educated professionals ready to enter the workforce and contribute to the DOE mission. To ensure the full

  14. Planning for environmental restoration of uranium mining and milling sites in Central and Eastern Europe. Proceedings of a workshop held under the technical co-operation project RER/9/022 on environmental restoration in Central and Eastern Europe

    International Nuclear Information System (INIS)

    1997-11-01

    An IAEA Regional Technical Co-operation (TC) project RER/9/022 on ''Environmental Restoration'' for central and eastern Europe and the former USSR was launched in 1992 and concluded at the end of 1996. The first phase of this project had the primary purpose of identifying and characterizing radioactively contaminated sites in the region, including evaluation of doses to the general public and other environmental impacts. The main result of this phase of the project were published in IAEA-TECDOC-865. A new 1995-1996 phase of the project focused on the radioactive contamination of uranium mining and milling sites and the development of plans for environmental restoration of these sites. While the 1993-1994 phase aimed at attracting the attention of Member States in the region to a long neglected problem, the second phase served as a stimulus to initiate concrete planning activities that would lead to corrective actions in highly contaminated areas in those countries. As a consequence, the project emphasis shifted from scientific discussions to the identification of responsibilities, planning activities, and the assessment of existing and required resources for the eventual implementation of restoration plans. The 1995-1996 phase of the project consisted of a planning meeting and three workshops that addressed different topical themes. The papers compiled in this publication were presented at the last workshop, held in Felix, Romania, 4-8 November 1996. They summarize national situations in environmental contamination as of the end of 1996 and ongoing or planned actions for remediation

  15. Environmental management: Integrating ecological evaluation, remediation, restoration, natural resource damage assessment and long-term stewardship on contaminated lands

    International Nuclear Information System (INIS)

    Burger, Joanna

    2008-01-01

    Ecological evaluation is essential for remediation, restoration, and Natural Resource Damage Assessment (NRDA), and forms the basis for many management practices. These include determining status and trends of biological, physical, or chemical/radiological conditions, conducting environmental impact assessments, performing remedial actions should remediation fail, managing ecosystems and wildlife, and assessing the efficacy of remediation, restoration, and long-term stewardship. The objective of this paper is to explore the meanings of these assessments, examine the relationships among them, and suggest methods of integration that will move environmental management forward. While remediation, restoration, and NRDA, among others, are often conducted separately, it is important to integrate them for contaminated land where the risks to ecoreceptors (including humans) can be high, and the potential damage to functioning ecosystems great. Ecological evaluations can range from inventories of local plants and animals, determinations of reproductive success of particular species, levels of contaminants in organisms, kinds and levels of effects, and environmental impact assessments, to very formal ecological risk assessments for a chemical or other stressor. Such evaluations can range from the individual species to populations, communities, ecosystems or the landscape scale. Ecological evaluations serve as the basis for making decisions about the levels and kinds of remediation, the levels and kinds of restoration possible, and the degree and kinds of natural resource injuries that have occurred because of contamination. Many different disciplines are involved in ecological evaluation, including biologists, conservationists, foresters, restoration ecologists, ecological engineers, economists, hydrologist, and geologists. Since ecological evaluation forms the basis for so many different types of environmental management, it seems reasonable to integrate management options

  16. Challenges in waste management and environmental restoration in the uranium mining industry

    Energy Technology Data Exchange (ETDEWEB)

    Jarrell, J. [Cameco Corp., Saskatoon, SK (Canada)

    2011-07-01

    Two components dominate the waste management efforts at conventional Canadian uranium mining and milling operations. These are the waste rock generated in the mining of ore as well as the mill tailings -- which are the residue solids remaining after uranium extraction. Much has changed in the management of these wastes over the years. Visually, current sites are generally more compact than those developed earlier, due to higher grade ores and less land disturbance. However, the more significant strides being made to better manage uranium mining wastes deal more with improved chemical and physical controls rather than those changes which are visible. Segregation of waste rock to separate out potentially problematic material within the more weakly mineralized halo surrounding the ore is now a core strategy. This segregation is based on both the waste rock's chemical and radiological characteristics. Better controls have also been introduced on tailings physical properties to minimize their permeability, along with better chemical controls to minimize tailings contaminant solubility. Efforts to engineer tailings properties are coupled with contrasting hydraulic conductivity between the consolidated tailings mass and surrounding geologic materials. This creates the necessary long-term containment controls built into modern tailings management facilities. Current challenges include selecting the correct decommissioning assumptions such as future land use and required environmental acceptance criteria, along with decisions as to when to carry out reclamation work in the life cycle of the mine and mill. Public discussion of restoration plans throughout the life of the facility is essential to build acceptable solutions. Along with challenges come successes. Most recently, improvements have been made in reducing treated water molybdenum and selenium levels. Other successes include the application of reverse osmosis technology on a large scale, recycling of uranium

  17. The great environmental restoration cost estimating shootout: A blind test of three DOE cost estimating groups

    International Nuclear Information System (INIS)

    Klemen, Paul

    1992-01-01

    The cost of the Department of Energy's (DOE) Environmental Restoration (ER) Program has increased steadily over the last three years and, in the process, has drawn increasing scrutiny from Congress, the public, and government agencies such as the Office of Management and Budget and the General Accounting Office. Programmatic costs have been reviewed by many groups from within the DOE as well as from outside agencies. While cost may appear to be a universally applicable barometer of project conditions, it is actually a single dimensional manifestation of a complex set of conditions. As such, variations in cost estimates can be caused by a variety of underlying factors such as changes in scope, schedule, performing organization, economic conditions, or regulatory environment. This paper will examine the subject of cost estimates by evaluating three different cost estimates prepared for a single project including two estimates prepared by project proponents and another estimate prepared by a review team. The paper identifies the reasons for cost growth as measured by the different estimates and evaluates the ability of review estimates to measure the validity of costs. The comparative technique used to test the three cost estimates will identify the reasons for changes in the estimated cost, over time, and evaluate the ability of an independent review to correctly identify the reasons for cost growth and evaluate the reasonableness of the cost proposed by the project proponents. Recommendations are made for improved cost estimates and improved cost estimate reviews. Conclusions are reached regarding the differences in estimate results that can be attributed to differences in estimating techniques, the implications of these differences for decision makers, and circumstances that are unique to environmental cost estimating. (author)

  18. A large-scale environmental flow experiment for riparian restoration in the Colorado River delta

    Science.gov (United States)

    Shafroth, Patrick B.; Schlatter, Karen; Gomez-Sapiens, Martha; Lundgren, Erick; Grabau, Matthew R.; Ramirez-Hernandez, Jorge; Rodriguez-Burgeueno, J. Eliana; Flessa, Karl W.

    2017-01-01

    Managing streamflow is a widely-advocated approach to provide conditions necessary for seed germination and seedling establishment of trees in the willow family (Salicaceae). Experimental flow releases to the Colorado River delta in 2014 had a primary objective of promoting seedling establishment of Fremont cottonwood (Populus fremontii) and Goodding's willow (Salix gooddingii). We assessed seed germination and seedling establishment of these taxa as well as the non-native tamarisk (Tamarix spp.) and native seepwillow shrubs (Baccharis spp.) in the context of seedling requirements and active land management (land grading, vegetation removal) at 23 study sites along 87 river km. In the absence of associated active land management, experimental flows to the Colorado River delta were minimally successful at promoting establishment of new woody riparian seedlings, except for non-native Tamarix. Our results suggest that the primary factors contributing to low seedling establishment varied across space, but included low or no seed availability in some locations for some taxa, insufficient soil moisture availability during the growing season indicated by deep groundwater tables, and competition from adjacent vegetation (and, conversely, availability of bare ground). Active land management to create bare ground and favorable land grades contributed to significantly higher rates of Salicaceae seedling establishment in a river reach with high groundwater tables. Our results provide insights that can inform future environmental flow deliveries to the Colorado River delta and its ecosystems and other similar efforts to restore Salicaceae taxa around the world.

  19. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing and Evaluation activities in the Program for the next five years. These activities range from bench-scale R ampersand D to full-scale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development Program (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management (ER ampersand WM) operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER ampersand WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. In July 1990 a forum was held announcing the robotics program. Over 60 organizations (industrial, university, and federal laboratory) made presentations on their robotics capabilities. To stimulate early interactions with the ER ampersand WM activities at DOE sites, as well as with the robotics community, the RTDP sponsored four technology demonstrations related to ER ampersand WM needs. These demonstrations integrated commercial technology with robotics technology developed by DOE in support of areas such as nuclear reactor maintenance and the civilian reactor waste program. 2 figs

  20. Environmental restoration program pollution prevention checklist guide for the evaluation of alternatives project phase

    International Nuclear Information System (INIS)

    1993-09-01

    Evaluation of alternative studies determine what decontamination and decommissioning (D ampersand D) alternatives are presented to regulators for facility and site cleanup. A key consideration in this process is the waste to be generated. Minimizing the volume and toxicity of this waste will ultimately contribute to the selection of the best clean-up option. The purpose of this checklist guide is to assist the user with incorporating pollution prevention/waste minimization (PP/WM) in all Evaluation of Alternatives (EV) phase projects of the Environmental Restoration (ER) Program. This guide will assist users with documenting PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to help users implement and evaluate waste reduction. Users can then establish numerical performance measures to measure progress in planning, training, self-assessments, field implementation, documentation, and technology transfer. Cost savings result as users train and assess themselves, eliminating expensive process waste assessments and audit teams

  1. Environmental Restoration Contractor Resource Conservation and Recovery Act Permit Implementation Plan

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1996-05-01

    This document contains the revised Environmental Restoration Contractor (ERC) Implementation Plan for compliance with the Dangerous Waste and Hazardous and Solid Waste Amendment portions of the Resource Conservation and Recovery Act (RCRA) Permit for the Treatment, Storage, and Disposal of Dangerous Waste (hereafter referred to as the open-quotes Permitclose quotes). The Permit became effective on September 28, 1994. The ERC has developed the Permit Implementation Plan to ensure that the Permit is properly implemented within the ERC project and functions. The plan contains a list of applicable permit conditions, descriptions, responsible organizations, and the status of compliance. The ERC's responsibilities for Permit implementation are identified within both project and functional organizations. Project Managers are responsible for complying with conditions specific to a particular treatment, storage, or disposal (TSD) unit. TSD-specific compliance in include items such as closure plan deliverables, reporting and record keeping requirements, or compliance with non-unit-specific tasks such as spill reporting and emergency response. Functional organizations are responsible for sitewide activities, such as coordinating Permit modifications and developing personnel training programs

  2. Environmental Restoration Program pollution prevention checklist guide for the facility characterization project phase

    International Nuclear Information System (INIS)

    1993-09-01

    A facility characterization (FC) is conducted to determine the nature and extent contamination at a potential hazardous facility waste site. The information gathered during an FC includes (1) data on the volume and chemical nature of the waste, (2) information on the extent of contamination and the migration potential of the contaminants, (3) preliminary information on evaluation of alternative concepts that can or cannot be considered, and (4)supportive technical and cost data. For the purposes of identification, the following operational phases will be used for definition for this phase of the decommissioning and decontamination process (1) facility characterization before clean up, (2) characterization during clean up, (3) characterization of waste materials, and (4) site characterization after clean up. A key consideration in this process is the prevention of any waste to be generated from these characterization activities. The purpose of this checklist guide is to assist users with incorporating pollution prevention/waste minimization (PP/WM) in all FC phase projects of the Environmental Restoration (ER) Program. This guide will help users document PP/WM activities for technology transfer and reporting requirements. Automated computer screens will be created from the checklist data to assist users with implementing and evaluating waste reduction

  3. Environmental Restoration Program pollution prevention performance measures for FY 1993 and 1994 remedial investigations

    International Nuclear Information System (INIS)

    1993-03-01

    The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program adopted a Pollution Prevention Program in March 1991. The program's mission is to minimize waste and prevent pollution in remedial investigations (RI), feasibility studies (FS), decontamination and decommissioning (D ampersand D), and surveillance and maintenance (S ampersand M) site program activities. Mission success will result in volume and/or toxicity reduction of generated waste. Energy Systems is producing a fully developed a Numerical Scoring System (NSS) and actually scoring the generators of Investigation Derived Waste (IDW) at six ER sites: Oak Ridge National Laboratory (ORNL), the Oak Ridge Y-12 Plant, the Oak Ridge K-25 site, Paducah Gaseous Diffusion Plant (Paducah), and Portsmouth Uranium Enrichment Complex (Portsmouth). This report summarizes the findings of this initial numerical scoring evaluation and shows where improvements in the overall ER Pollution prevention program may be required. This report identifies a number of recommendations that, if implemented, would help to improve site-performance measures. The continued development of the NSS will support generators in maximizing their Pollution Prevention/Waste Minimization efforts. Further refinements of the NSS, as applicable suggest comments and/or recommendations for improvement

  4. Environmental Restoration (ER) Consolidated Quarterly Report_April to June 2017_ October 2017

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, John R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-10-01

    This Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) provides the status of ongoing corrective action activities being implemented at Sandia National Laboratories, New Mexico (SNL/NM) during the April, May, and June 2017 quarterly reporting period. Table I-1 lists the Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) identified for corrective action at SNL/NM. Sections I.2.1 and I.2.2 summarize the work completed during this quarter. Section I.2.1 summarizes the quarterly activities at sites undergoing corrective action field activities. Field activities are conducted at the three groundwater AOCs (Burn Site Groundwater [BSG AOC], Technical Area [TA]-V Groundwater [TAVG AOC], and Tijeras Arroyo Groundwater [TAG AOC]). Section I.2.2 summarizes quarterly activities at sites where the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB) issued a certificate of completion and the sites are in the corrective action complete (CAC) regulatory process. Currently, SWMUs 8 and 58, 68, 149, 154, and 502 are in the CAC regulatory process. Corrective action activities are deferred at the Long Sled Track (SWMU 83), the Gun Facilities (SWMU 84), and the Short Sled Track (SWMU 240) because these three sites are active mission facilities. These three active mission sites are located in TA-III.

  5. Environmental Restoration Progam Waste Minimization and Pollution Prevention Awareness Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    In response to DOE Order 5400.1 this plan outlines the requirements for a Waste Minimization and Pollution Prevention Awareness Program for the Environmental Restoration (ER) Program at Martin Marietta Energy System, Inc. Statements of the national, Department of Energy, Energy Systems, and Energy Systems ER Program policies on waste minimization are included and reflect the attitudes of these organizations and their commitment to the waste minimization effort. Organizational responsibilities for the waste minimization effort are clearly defined and discussed, and the program objectives and goals are set forth. Waste assessment is addressed as being a key element in developing the waste generation baseline. There are discussions on the scope of ER-specific waste minimization techniques and approaches to employee awareness and training. There is also a discussion on the process for continual evaluation of the Waste Minimization Program. Appendixes present an implementation schedule for the Waste Minimization and Pollution Prevention Program, the program budget, an organization chart, and the ER waste minimization policy

  6. Analysis of explosion-induced releases of toxic materials at an environmental restoration project

    International Nuclear Information System (INIS)

    Bloom, S.G.; Moon, W.H. Jr.

    1993-01-01

    Prior to 1988, a variety of materials were buried on the US DOE Oak Ridge Reservation. Records of the disposal operations are incomplete and toxic materials may have been placed adjacent to potential explosives. One of the safety concerns in conducting an environmental restoration project at the burial sites, is the possibility of an explosion which could release toxic materials to the atmosphere. A safety analysis examined the consequences of such releases by first postulating an upper bound for the strength of an explosive. A correlation, developed by Steindler and Seefeldt of Argonne National Laboratory, was then used to estimate the amount and particle-size distribution of the material that could become airborne from the explosion. The estimated amount of airborne material was the source term in an atmospheric dispersion model which was used to calculate infinite-time, concentration-time integrals and 5-minute, time- weighted average concentrations at locations down-wind from the explosion. The dispersion model includes particle deposition as a function of particle-size distribution class. The concentration-time integrals and average concentrations were compared to published guidelines to assess the consequences of an accidental explosion

  7. Proceedings of the US Department of Energy Office of Environmental Restoration and Waste Management

    International Nuclear Information System (INIS)

    1990-09-01

    The fifth of a series of waste minimization (WMIN)/reduction workshops (Waste Reduction Workshop V) was held at the Little Tree Inn in Idaho Falls, Idaho, on July 24--26, 1990. The workshops are held under the auspices of the US Department of Energy's (DOE's) Office of Environmental Restoration and Waste Management (EM). The purpose of this workshop was to provide a forum for sharing site activities in WMIN/reduction planning. Topics covered were management commitment, organizational structure, goal setting, reporting requirements, data bases and tracking systems, pollution prevention, awareness and incentives, information exchange, process waste assessment (PWA) implementation, and recycling internal and external. The workshops assist DOE waste-generating sites in implementing WMIN/reduction programs, plans, and activities, thus providing for optimal waste reduction within the DOE complex. All wastes are considered within this discipline: liquid, solid, and airborne, within the categories of high-level waste (HLW), transuranic waste (TRU), low-level waste (LLW), hazardous waste, and mixed waste

  8. Proceedings of the US Department of Energy Office of Environmental Restoration and Waste Management

    Energy Technology Data Exchange (ETDEWEB)

    1990-09-01

    The fifth of a series of waste minimization (WMIN)/reduction workshops (Waste Reduction Workshop V) was held at the Little Tree Inn in Idaho Falls, Idaho, on July 24--26, 1990. The workshops are held under the auspices of the US Department of Energy's (DOE's) Office of Environmental Restoration and Waste Management (EM). The purpose of this workshop was to provide a forum for sharing site activities in WMIN/reduction planning. Topics covered were management commitment, organizational structure, goal setting, reporting requirements, data bases and tracking systems, pollution prevention, awareness and incentives, information exchange, process waste assessment (PWA) implementation, and recycling internal and external. The workshops assist DOE waste-generating sites in implementing WMIN/reduction programs, plans, and activities, thus providing for optimal waste reduction within the DOE complex. All wastes are considered within this discipline: liquid, solid, and airborne, within the categories of high-level waste (HLW), transuranic waste (TRU), low-level waste (LLW), hazardous waste, and mixed waste.

  9. Bechtel Hanford, Inc. network security plan for the environmental restoration contract

    International Nuclear Information System (INIS)

    McCaffrey, M.B.

    1997-01-01

    As part of the Computer Protection Program, this Network Security Plan identifies the specific security measures used to protect the Bechtel Hanford, Inc. (BHI) enterprise network. The network consists of the communication infrastructure and information systems used by BHI to perform work related to the Environmental Restoration Contract (ERC) at the Hanford Site. It provides electronic communication between the ERC-leased facilities in Richland, Washington and other facilities located on the Hanford Site. Network gateways to other site and offsite networks provide electronic communication with the rest of the Hanford community. The enterprise network is comprised of several individual networks that operate under different conditions and perform different functions. The principal network used by BHI is the Bechtel Local Area Network (BLAN). This document identifies specific security issues surrounding the BLAN and the measures BHI takes to protect it. The other BHI-operated networks are discussed from the perspective of the security impact they have on the BLAN. This plan addresses security for individual and shared computer systems connected to the BHI networks as well as the gateways between other site and external networks. It specifically does not address computer-based information systems that store or process particularly sensitive data, computer systems connected to other site networks (e.g., Hanford Local Area Network), or standalone computers located in ERC facilities

  10. Lessons Learned from the On-Site Disposal Facility at Fernald Closure Project

    International Nuclear Information System (INIS)

    Kumthekar, U.A.; Chiou, J.D.

    2006-01-01

    The On-Site Disposal Facility (OSDF) at the U.S. Department of Energy's (DOE) Fernald Closure Project near Cincinnati, Ohio is an engineered above-grade waste disposal facility being constructed to permanently store low level radioactive waste (LLRW) and treated mixed LLRW generated during Decommissioning and Demolition (D and D) and soil remediation performed in order to achieve the final land use goal at the site. The OSDF is engineered to store 2.93 million cubic yards of waste derived from the remediation activities. The OSDF is intended to isolate its LLRW from the environment for at least 200 years and for up to 1,000 years to the extent practicable and achievable. Construction of the OSDF started in 1997 and waste placement activities will complete by the middle of April 2006 with the final cover (cap) placement over the last open cell by the end of Spring 2006. An on-site disposal alternative is considered critical to the success of many large-scale DOE remediation projects throughout the United States. However, for various reasons this cost effective alternative is not readily available in many cases. Over the last ten years Fluor Fernald Inc. has cumulated many valuable lessons learned through the complex engineering, construction, operation, and closure processes of the OSDF. Also in the last several years representatives from other DOE sites, State agencies, as well as foreign government agencies have visited the Fernald site to look for proven experiences and practices, which may be adapted for their sites. This paper present a summary of the major issues and lessons leaned at the Fernald site related to engineering, construction, operation, and closure processes for the disposal of remediation waste. The purpose of this paper is to share lessons learned and to benefit other projects considering or operating similar on-site disposal facilities from our successful experiences. (authors)

  11. Environmental restoration plans and activities in France: 1995-1996 progress report

    International Nuclear Information System (INIS)

    Roussel, V.

    1997-01-01

    In 50 years, more than 200 mining sites and 11 processing plants have contributed to French uranium production. At present only two mines are still in production. The others have already been restored or are in the final phase of restoration. This report gives a retrospective account of developments and statutory actions currently in progress, with examples of sites at various stages of restoration. The importance of research and development studies as well as efforts being put in to communicate with all the parties concerned in these restoration projects are specially emphasized. (author)

  12. Development and use of innovative approaches to waste management and environmental restoration: Potential liability and its implications

    Energy Technology Data Exchange (ETDEWEB)

    Owens, W.L.

    1990-12-01

    The US Department of Energy (DOE) has established as its goal to have all of its facilities cleaned up and in compliance with all applicable environmental laws by the year 2019. As part of its plan to achieve that goal, DOE created, in November 1989, an Office of Environmental Restoration and Waste Management (EM) and, within EM, an Office of Technology Development (OTD). Since the achievement of DOE`s long-term objective in the area of waste management and environmental restoration is not possible utilizing only existing technology, the importance of OTD`s mission is clear. A question has been raised regarding the nature of the potential liability associated with development, testing, and use of new technologies for waste management and environmental restoration; and the impact it may have on the ability or willingness of other parties to participate in DOE`s technology development program. This report is intended to provide at least a preliminary answer to the question. Given the range of activities involved in the technology development process, there are many circumstances that could result in liability. Therefore, the discussion here is somewhat general. It may, however, provide a base for more detailed analysis, at a later time, of liability issues raised by specific circumstances.

  13. Development and use of innovative approaches to waste management and environmental restoration: Potential liability and its implications

    Energy Technology Data Exchange (ETDEWEB)

    Owens, W.L.

    1990-12-01

    The US Department of Energy (DOE) has established as its goal to have all of its facilities cleaned up and in compliance with all applicable environmental laws by the year 2019. As part of its plan to achieve that goal, DOE created, in November 1989, an Office of Environmental Restoration and Waste Management (EM) and, within EM, an Office of Technology Development (OTD). Since the achievement of DOE's long-term objective in the area of waste management and environmental restoration is not possible utilizing only existing technology, the importance of OTD's mission is clear. A question has been raised regarding the nature of the potential liability associated with development, testing, and use of new technologies for waste management and environmental restoration; and the impact it may have on the ability or willingness of other parties to participate in DOE's technology development program. This report is intended to provide at least a preliminary answer to the question. Given the range of activities involved in the technology development process, there are many circumstances that could result in liability. Therefore, the discussion here is somewhat general. It may, however, provide a base for more detailed analysis, at a later time, of liability issues raised by specific circumstances.

  14. A systematic review of ecological attributes that confer resilience to climate change in environmental restoration.

    Directory of Open Access Journals (Sweden)

    Britta L Timpane-Padgham

    Full Text Available Ecological restoration is widely practiced as a means of rehabilitating ecosystems and habitats that have been degraded or impaired through human use or other causes. Restoration practices now are confronted by climate change, which has the potential to influence long-term restoration outcomes. Concepts and attributes from the resilience literature can help improve restoration and monitoring efforts under changing climate conditions. We systematically examined the published literature on ecological resilience to identify biological, chemical, and physical attributes that confer resilience to climate change. We identified 45 attributes explicitly related to climate change and classified them as individual- (9, population- (6, community- (7, ecosystem- (7, or process-level attributes (16. Individual studies defined resilience as resistance to change or recovery from disturbance, and only a few studies explicitly included both concepts in their definition of resilience. We found that individual and population attributes generally are suited to species- or habitat-specific restoration actions and applicable at the population scale. Community attributes are better suited to habitat-specific restoration at the site scale, or system-wide restoration at the ecosystem scale. Ecosystem and process attributes vary considerably in their type and applicability. We summarize these relationships in a decision support table and provide three example applications to illustrate how these classifications can be used to prioritize climate change resilience attributes for specific restoration actions. We suggest that (1 including resilience as an explicit planning objective could increase the success of restoration projects, (2 considering the ecological context and focal scale of a restoration action is essential in choosing appropriate resilience attributes, and (3 certain ecological attributes, such as diversity and connectivity, are more commonly considered to

  15. Screening and comparison of remedial alternatives for the South Field and flyash piles at the Fernald site

    International Nuclear Information System (INIS)

    Bumb, A.C.; Jones, G.N.

    1996-05-01

    The South Field, the Inactive Flyash Pile, and the Active Flyash Pile are in close proximity to each other and are part of Operable Unit 2 (OU2) at the Fernald Environmental Management Project (FEMP). The baseline risk assessment indicated that the exposure pathways which pose the most significant risk are external radiation from radionuclides in surface soils and use of uranium contaminated groundwater. This paper presents screening and comparison of various remedial alternatives considered to mitigate risks from the groundwater pathway. Eight remedial alternatives were developed which consisted of consolidation and capping, excavation and off-site disposal with or without treatment, excavation and on-site disposal with or without treatment and combinations of these. Risk-based source (soil) preliminary remediation levels (PRLs) and waste acceptance criteria (WACs) were developed for consolidation and capping, excavation, and on-site disposal cell. The PRLs and WACs were developed using an integrated modeling tool consisting of an infiltration model, a surface water model, a vadose zone model, and a three-dimensional contaminant migration model in saturated media. The PRLs and WACs were then used to determine need for soil treatment, determine excavation volumes, and screen remedial alternatives. The selected remedial alternative consisted of excavation and on-site disposal with off-site disposal of the fraction exceeding the WAC

  16. 75 FR 13138 - Grand Ditch Breach Restoration Environmental Impact Statement, Rocky Mountain National Park, CO

    Science.gov (United States)

    2010-03-18

    ... Restoration, Rocky Mountain National Park, Colorado. This effort will result in ecological restoration of the... Information Office, Rocky Mountain National Park, 1000 U.S. Highway 36, Estes Park, Colorado 80517-8397, (970.../romo , and from the Public Information Office, Rocky Mountain National Park, 1000 U.S. Highway 36...

  17. Environmental Assessment for Mill Creek Restoration Project, Eglin Air Force Base, FL

    Science.gov (United States)

    2007-02-28

    slope. These factors are essential components for any stream restoration project. Successful stream restoration applies fluvial geomorphology ...Central Florida Press, Orlando, Florida, 765 p. Rosgen, D. 1996. Applied River Morphology. Wildland Hydrology, Pagosa Springs, Colorado . Rosgen, D...originally was connected with the valley floodplain, but now ponds exist upstream of each culvert changing fluvial dynamics from lotic to lentic

  18. 78 FR 60309 - Draft Environmental Impact Statement for the Restoration of Native Species in High Elevation...

    Science.gov (United States)

    2013-10-01

    ...) and to restore MYLF populations to many locations in the parks where they have gone extinct; (3) to enable the NPS to fulfill its mission and policy directives to conserve native animals, plants and... recently gone extinct; monitoring restoration work and ecosystem responses; continuing research; and fish...

  19. 75 FR 21651 - Final Environmental Impact Statement; Prisoners Harbor Coastal Wetland Restoration Plan, Channel...

    Science.gov (United States)

    2010-04-26

    ... Harbor Coastal Wetland Restoration Plan, Channel Islands National Park, Santa Barbara County, CA; Notice... Statement (EIS) assessing the potential impacts of restoring the coastal wetland and lower riparian corridor... to stream flow erosion in Canada del Puerto by placement of a small earth, log, and cobble berm...

  20. Development of an Integrated Performance Evaluation Program (IPEP) for the Department of Energy's Office of Environmental Restoration and Waste Management

    International Nuclear Information System (INIS)

    Streets, W.E.; Ka; Lindahl, P.C.; Bottrell, D.; Newberry, R.; Morton, S.; Karp, K.

    1993-01-01

    Argonne National Laboratory (ANL), in collaboration with DOE's Radiological and Environmental Sciences Laboratory (RESL), Environmental Measurements Laboratory (EML), and Grand Junction Project Office (GJPO), is working with the Department of Energy (DOE) Headquarters and the US Environmental Protection Agency (EPA) to develop the Integrated Performance Evaluation Program (IPEP). The purpose of IPEP is to integrate performance evaluation (PE) information from existing PE programs with expanded quality assurance (QA) activities to develop information about the quality of radiological, mixed waste, and hazardous environmental sample analyses provided by all laboratories supporting DOE Environmental Restoration and Waste Management (EM) programs. The IPEP plans to utilize existing PE programs when available and appropriate for use by DOE-EM; new PE programs will be developed only when no existing program meets DOE's needs

  1. Community Surveys: Low Dose Radiation. Fernald, Ohio and Rocky Flats, Colorado

    International Nuclear Information System (INIS)

    C. K. Mertz; James Flynn; Donald G. MacGregor; Theresa Satterfield; Stephen M. Johnson; Seth Tuler; Thomas Webler email ckmertz@decisionresearch.org

    2002-01-01

    This report is intended to present a basic description of the data from the two community surveys and to document the text of the questions; the methods used for the survey data collection; and a brief overview of the results. Completed surveys were conducted at local communities near the Rocky Flats, Colorado and the Fernald, Ohio sites; no survey was conducted for the Brookhaven, New York site. Fernald. The Fernald sample was randomly selected from 98% of all potential residential telephones in the townships of Ross, Morgan, and Crosby. The only telephone exchanges not used for the Fernald study had 4%, or fewer, of the holders of the telephone numbers actually living in either of the three target townships. Surveying started on July 24, 2001 and finished on August 30, 2001. A total of 399 completed interviews were obtained resulting in a CASRO response rate of 41.8%. The average length of an interview was 16.5 minutes. Rocky Flats. The sample was randomly selected from all potential residential telephones in Arvada and from 99% of the potential telephones in Westminster. Surveying started on August 10, 2001 and finished on September 25, 2001. A total of 401 completed interviews were obtained with a CASRO response rate of 32.5%. The average length of an interview was 15.7 minutes. Overall, respondents hold favorable views of science. They indicate an interest in developments in science and technology, feel that the world is better off because of science, and that science makes our lives healthier, easier, and more comfortable. However, respondents are divided on whether science should decide what is safe or not safe for themselves and their families. The majority of the respondents think that standards for exposure to radiation should be based on what science knows about health effects of radiation and on what is possible with today's technology. Although few respondents had visited the sites, most had heard or read something about Fernald or Rocky Flat s in the

  2. Community Surveys: Low Dose Radiation. Fernald, Ohio and Rocky Flats, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    C. K. Mertz; James Flynn; Donald G. MacGregor; Theresa Satterfield; Stephen M. Johnson; Seth Tuler; Thomas Webler

    2002-10-16

    This report is intended to present a basic description of the data from the two community surveys and to document the text of the questions; the methods used for the survey data collection; and a brief overview of the results. Completed surveys were conducted at local communities near the Rocky Flats, Colorado and the Fernald, Ohio sites; no survey was conducted for the Brookhaven, New York site. Fernald. The Fernald sample was randomly selected from 98% of all potential residential telephones in the townships of Ross, Morgan, and Crosby. The only telephone exchanges not used for the Fernald study had 4%, or fewer, of the holders of the telephone numbers actually living in either of the three target townships. Surveying started on July 24, 2001 and finished on August 30, 2001. A total of 399 completed interviews were obtained resulting in a CASRO response rate of 41.8%. The average length of an interview was 16.5 minutes. Rocky Flats. The sample was randomly selected from all potential residential telephones in Arvada and from 99% of the potential telephones in Westminster. Surveying started on August 10, 2001 and finished on September 25, 2001. A total of 401 completed interviews were obtained with a CASRO response rate of 32.5%. The average length of an interview was 15.7 minutes. Overall, respondents hold favorable views of science. They indicate an interest in developments in science and technology, feel that the world is better off because of science, and that science makes our lives healthier, easier, and more comfortable. However, respondents are divided on whether science should decide what is safe or not safe for themselves and their families. The majority of the respondents think that standards for exposure to radiation should be based on what science knows about health effects of radiation and on what is possible with today's technology. Although few respondents had visited the sites, most had heard or read something about Fernald or Rocky Flat s in

  3. Preliminary evaluation of the use of the greater confinement disposal concept for the disposal of Fernald 11e(2) byproduct material at the Nevada Test Site

    International Nuclear Information System (INIS)

    Cochran, J.R.; Brown, T.J.; Stockman, H.W.; Gallegos, D.P.; Conrad, S.H.; Price, L.L.

    1997-09-01

    This report documents a preliminary evaluation of the ability of the greater confinement disposal boreholes at the Nevada Test Site to provide long-term isolation of radionuclides from the disposal of vitrified byproduct material. The byproduct material is essentially concentrated residue from processing uranium ore that contains a complex mixture of radionuclides, many of which are long-lived and present in concentrations greater than 100,000 picoCuries per gram. This material has been stored in three silos at the fernald Environmental Management Project since the early 1950s and will be vitrified into 6,000 yd 3 (4,580 m 3 ) of glass gems prior to disposal. This report documents Sandia National Laboratories' preliminary evaluation for disposal of the byproduct material and includes: the selection of quantitative performance objectives; a conceptual model of the disposal system and the waste; results of the modeling; identified issues, and activities necessary to complete a full performance assessment

  4. Integrated Safety Management System Phase 1 and 2 Verification for the Environmental Restoration Contractor Volumes 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    CARTER, R.P.

    2000-04-04

    DOE Policy 450.4 mandates that safety be integrated into all aspects of the management and operations of its facilities. The goal of an institutionalized Integrated Safety Management System (ISMS) is to have a single integrated system that includes Environment, Safety, and Health requirements in the work planning and execution processes to ensure the protection of the worker, public, environment, and the federal property over the life cycle of the Environmental Restoration (ER) Project. The purpose of this Environmental Restoration Contractor (ERC) ISMS Phase MI Verification was to determine whether ISMS programs and processes were institutionalized within the ER Project, whether these programs and processes were implemented, and whether the system had promoted the development of a safety conscious work culture.

  5. Environmental Restoration Program pollution prevention performance measures for FY 1993 and 1994 remedial investigations: Generator training manual

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    This computer-based program is designed to help waste generators in the Environmental Restoration (ER) Program prevent pollution at the DOE Oak Ridge Field Office (DOE-OR) facilities in Oak Ridge, Paducah, and Portsmouth. The Numerical Scoring System (NSS) is an interactive system designed to maintain data on ER Program pollution prevention efforts and to measure the success of these efforts through the ER Program life cycle.

  6. The role of Quality Oversight in nuclear and hazardous waste management and environmental restoration at Westinghouse Hanford Company

    International Nuclear Information System (INIS)

    Fouad, H.Y.

    1994-05-01

    The historical factors that led to the waste at Hanford are outlined. Westinghouse Hanford Company mission and organization are described. The role of the Quality Oversight organization in nuclear hazardous waste management and environmental restoration at Westinghouse Hanford Company is delineated. Tank Waste Remediation Systems activities and the role of the Quality Oversight organization are described as they apply to typical projects. Quality Oversight's role as the foundation for implementation of systems engineering and operation research principles is pointed out

  7. Annual report of the Environmental Restoration Monitoring and Assessment Program at Oak Ridge National Laboratory for FY 1992

    International Nuclear Information System (INIS)

    Clapp, R.B.

    1992-09-01

    This report summarizes the salient features of the annual efforts of the investigations and monitoring, conducted to support the Environmental Restoration (ER) Program at Oak Ridge National Laboratory (ORNL). The results presented can be used to develop a conceptual understanding of the key contaminants and the sources, fluxes, and processes affecting their distribution and movement. This information forms a basis for prioritizing sites and for selecting, implementing, and evaluating remedial actions. Groundwater, soils, sediments, and surface water monitoring results are described

  8. Environmental Restoration Program pollution prevention performance measures for FY 1993 and 1994 remedial investigations: Generator training manual

    International Nuclear Information System (INIS)

    1993-03-01

    This computer-based program is designed to help waste generators in the Environmental Restoration (ER) Program prevent pollution at the DOE Oak Ridge Field Office (DOE-OR) facilities in Oak Ridge, Paducah, and Portsmouth. The Numerical Scoring System (NSS) is an interactive system designed to maintain data on ER Program pollution prevention efforts and to measure the success of these efforts through the ER Program life cycle

  9. Technical Approach and Plan for Transitioning Spent Nuclear Fuel (SNF) Project Facilities to the Environmental Restoration Program

    International Nuclear Information System (INIS)

    SKELLY, W.A.

    1999-01-01

    This document describes the approach and process in which the 100-K Area Facilities are to be deactivated and transitioned over to the Environmental Restoration Program after spent nuclear fuel has been removed from the K Basins. It describes the Transition Project's scope and objectives, work breakdown structure, activity planning, estimated cost, and schedule. This report will be utilized as a planning document for project management and control and to communicate details of project content and integration

  10. Annual report of the Environmental Restoration Monitoring and Assessment Program at Oak Ridge National Laboratory for FY 1992

    Energy Technology Data Exchange (ETDEWEB)

    Clapp, R.B. (ed.)

    1992-09-01

    This report summarizes the salient features of the annual efforts of the investigations and monitoring, conducted to support the Environmental Restoration (ER) Program at Oak Ridge National Laboratory (ORNL). The results presented can be used to develop a conceptual understanding of the key contaminants and the sources, fluxes, and processes affecting their distribution and movement. This information forms a basis for prioritizing sites and for selecting, implementing, and evaluating remedial actions. Groundwater, soils, sediments, and surface water monitoring results are described.

  11. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R ampersand D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER ampersand WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER ampersand WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT ampersand E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs

  12. Corrective action management unit application for the Environmental Restoration Disposal Facility

    International Nuclear Information System (INIS)

    Evans, G.C.

    1994-06-01

    The Environmental Restoration Disposal Facility (ERDF) is to accept both CERCLA (EPA-regulated) and RCRA (Ecology-regulated) remediation waste. The ERDF is considered part of the overall remediation strategy on the Hanford Site, and as such, determination of ERDF viability has followed both RCRA and CERCLA decision making processes. Typically, determination of the viability of a unit, such as the ERDF, would occur as part of record of decision (ROD) or permit modification for each remediation site before construction of the ERDF. However, because construction of the ERDF may take a significant amount of time, it is necessary to begin design and construction of the ERDF before final RODs/permit modifications for the remediation sites. This will allow movement of waste to occur quickly once the final remediation strategy for the RCRA and CERCLA past-practice units is determined. Construction of the ERDF is a unique situation relative to Hanford Facility cleanup, requiring a Hanford Facility specific process be developed for implementing the ERDF that would satisfy both RCRA and CERCLA requirements. While the ERDF will play a significant role in the remediation process, initiation of the ERDF does not preclude the evaluation of remedial alternatives at each remediation site. To facilitate this, the January 1994 amendment to the Tri-Party Agreement recognizes the necessity for the ERDF, and the Tri-Party Agreement states: ''Ecology, EPA, and DOE agree to proceed with the steps necessary to design, approve, construct, and operate such a ... facility.'' The Tri-Party Agreement requires the DOE-RL to prepare a comprehensive ''package'' for the EPA and Ecology to consider in evaluating the ERDF. The package is to address the criteria listed in 40 CFR 264.552(c) for corrective action management unit (CAMU) designation and a CERCLA ROD. This CAMU application is submitted as part of the Tri-Party Agreement-required information package

  13. Corrective action management unit application for the Environmental Restoration Disposal Facility

    Energy Technology Data Exchange (ETDEWEB)

    Evans, G.C.

    1994-06-01

    The Environmental Restoration Disposal Facility (ERDF) is to accept both CERCLA (EPA-regulated) and RCRA (Ecology-regulated) remediation waste. The ERDF is considered part of the overall remediation strategy on the Hanford Site, and as such, determination of ERDF viability has followed both RCRA and CERCLA decision making processes. Typically, determination of the viability of a unit, such as the ERDF, would occur as part of record of decision (ROD) or permit modification for each remediation site before construction of the ERDF. However, because construction of the ERDF may take a significant amount of time, it is necessary to begin design and construction of the ERDF before final RODs/permit modifications for the remediation sites. This will allow movement of waste to occur quickly once the final remediation strategy for the RCRA and CERCLA past-practice units is determined. Construction of the ERDF is a unique situation relative to Hanford Facility cleanup, requiring a Hanford Facility specific process be developed for implementing the ERDF that would satisfy both RCRA and CERCLA requirements. While the ERDF will play a significant role in the remediation process, initiation of the ERDF does not preclude the evaluation of remedial alternatives at each remediation site. To facilitate this, the January 1994 amendment to the Tri-Party Agreement recognizes the necessity for the ERDF, and the Tri-Party Agreement states: ``Ecology, EPA, and DOE agree to proceed with the steps necessary to design, approve, construct, and operate such a ... facility.`` The Tri-Party Agreement requires the DOE-RL to prepare a comprehensive ``package`` for the EPA and Ecology to consider in evaluating the ERDF. The package is to address the criteria listed in 40 CFR 264.552(c) for corrective action management unit (CAMU) designation and a CERCLA ROD. This CAMU application is submitted as part of the Tri-Party Agreement-required information package.

  14. 1995 annual water monitoring report, LEHR environmental restoration, University of California at Davis

    International Nuclear Information System (INIS)

    Stewart, D.L.; Smith, R.M.; Sauer, D.R.

    1996-03-01

    This 1995 Annual Water Monitoring Report presents analytical data collected between January and December 1995 at the Laboratory for Energy-Related Health Research (LEHR) located at the University of California (UC), Davis. This report has been prepared by Pacific Northwest National Laboratory in compliance with the Water Monitoring Plan for the LEHR site, which contains the sample collection, analysis, and quality assurance/quality control procedures and reporting requirements. Water monitoring during 1995 was conducted in conjunction with the Remedial Investigation/Feasibility Study currently being implemented at the LEHR site as part of a US Department of Energy (DOE)-sponsored environmental restoration program. Based on a review of historical groundwater monitoring data compiled since the fall of 1990, the list of analytes included in the program was reduced and the schedule for analyzing the remaining analytes was revised. The revision was implemented for the first time in the summer monitoring period. Analytes eliminated from the program were those that were (1) important for establishing baseline groundwater chemistry (alkalinity, anions, Eh, total organic carbon, and chemical oxygen demand); (2) important for establishing sources of contamination; (3) not detected in water samples or not from the LEHR site; and (4) duplicates of another measurement. Reductions in the analytical schedule were based on the monitoring history for each well; the resultant constituents of concern list was developed for individual wells. Depending on its importance in a well, each analyte was analyzed quarterly, semi-annually, or annually. Pollutants of major concern include organic compounds, metals, and radionuclides

  15. Electronic document management system analysis report and system plan for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    Frappaolo, C.

    1995-09-01

    Lockheed Martin Energy Systems, Inc. (LMES) has established and maintains Document Management Centers (DMCs) to support Environmental Restoration Program (ER) activities undertaken at three Oak Ridge facilities: Oak Ridge National Laboratory, Oak Ridge K-25 Site, Oak Ridge Y-12 Plant; and two sister sites: Portsmouth Gaseous Diffusion Plant in Portsmouth, Ohio, and Paducah Gaseous Diffusion Plant in Paducah, Kentucky. The role of the DMCs is to receive, store, retrieve, and properly dispose of records. In an effort to make the DMCs run more efficiently and to more proactively manage the records' life cycles from cradle to grave, ER has decided to investigate ways in which Electronic Document Management System (EDMS) technologies can be used to redefine the DMCs and their related processes. Specific goals of this study are tightening control over the ER documents, establishing and enforcing record creation and retention procedures, speeding up access to information, and increasing the accessibility of information. A working pilot of the solution is desired within the next six months. Based on a series of interviews conducted with personnel from each of the DMCs, key management, and individuals representing related projects, it is recommended that ER utilize document management, full-text retrieval, and workflow technologies to improve and automate records management for the ER program. A phased approach to solution implementation is suggested starting with the deployment of an automated storage and retrieval system at Portsmouth. This should be followed with a roll out of the system to the other DMCs, the deployment of a workflow-enabled authoring system at Portsmouth, and a subsequent roll out of this authoring system to the other sites

  16. ANL technical support program for DOE Environmental Restoration and Waste Management

    International Nuclear Information System (INIS)

    Bates, J.K.; Bradley, C.R.; Buck, E.C.; Cunnane, J.C.; Dietz, N.L.; Ebert, W.L.; Emery, J.W.; Feng, X.; Gerding, T.J.; Gong, M.; Hoh, J.C.; Mazer, J.J.; Wronkiewicz, D.J.; Bourcier, W.L.; Morgan, L.E.; Newton, L.; Nielsen, J.K.; Phillips, B.L.; Ewing, R.C.; Wang, L.; Li, H.; Tomozawa, M.

    1993-05-01

    A program was established for DOE Environmental Restoration and Waste Management (EM) to evaluate factors that are anticipated to affect waste glass reaction during repository disposal, especially in an unsaturated environment typical of what may be expected for the proposed Yucca Mountain repository site. This report covers progress in FY 1992 on the following tasks: 1. A compendium of the characteristics of high-level nuclear waste borosilicate glass has been written. 2. A critical review of important parameters that affect the reactivity of glass in an unsaturated environment is being prepared. 3. A series of tests has been started to evaluate the reactivity of fully radioactive glasses in a high-level waste repository environment and compare it to the reactivity of synthetic, nonradioactive glasses of similar composition. 4. The effect of radiation upon the durability of waste glasses at a high glass surface area-to-liquid volume (SA/V) ratio and a high gas-to-liquid volume ratio will be assessed. These tests address both vapor and high SA/V liquid conditions. 5. A series of tests is being performed to compare the extent of reaction of nuclear waste glasses at various SAN ratios. Such differences in the SAN ratio may significantly affect glass durability. 6. A series of natural analogue tests is being analyzed to demonstrate a meaningful relationship between experimental and natural alteration conditions. 7. Analytical electron microscopy (AEM), infrared spectroscopys and nuclear resonant profiling are being used to assess the glass/water reaction pathway by identifying intermediate phases that appear on the reacting glass. Additionally, colloids from the leach solutions are being studied using AEM. 8. A technical review of AEM results is being provided. 9. A study of water diffusion involving nuclear waste glasses is being performed. 10. A mechanistically based model is being developed to predict the performance of glass over repository-relevant time periods

  17. Reengineering of Analytical Data Management for the Environmental Restoration Project at Los Alamos National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Bolivar, S.; Dorries, A.; Nasser, K.; Scherma, S.

    2003-02-27

    The Environmental Restoration (ER) Project at Los Alamos National Laboratory (LANL) is responsible for the characterization, clean up, and monitoring of over 2,124 identified potential release sites (PRS). These PRSs have resulted from operations associated with weapons and energy related research which has been conducted at LANL since 1942. To accomplish mission goals, the ER Project conducts field sampling to determine possible types and levels of chemical contamination as well as their geographic extent. Last fiscal year, approximately 4000 samples were collected during ER Project field sampling campaigns. In the past, activities associated with field sampling such as sample campaign planning, paperwork, shipping and analytical laboratory tracking; verification and order fulfillment; validation and data quality assurance were performed by multiple groups working with a variety of software applications, databases and hard copy reports. This resulted in significant management and communication difficulties, data delivery delays, and inconsistent processes; it also represented a potential threat to overall data integrity. Creation of an organization, software applications and a data process that could provide for cost-effective management of the activities and data mentioned above became a management priority, resulting in a development of a reengineering task. This reengineering effort--currently nearing completion--has resulted in personnel reorganization, the development of a centralized data repository, and a powerful web-based sample management system that allows for an appreciably streamlined and more efficient data process. These changes have collectively cut data delivery times, allowed for larger volumes of samples and data to be handled with fewer personnel, and resulted in significant cost savings. This paper will provide a case study of the reengineering effort undertaken by the ER Project of its analytical data management process. It includes

  18. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    In FY 1990 Robotics Technology Development Program (RTDP) planning teams visited five DOE sites. These sites were selected by the Office of Technology Development to provide a needs basis for developing a 5-Year Plan. Visits to five DOE sites provided identification of needs for robotics technology development to support Environmental Restoration and Waste Management (ER ampersand WM) projects at those sites. Additional site visits will be conducted in the future to expand the planning basis. This volume summarizes both the results of the site visits and the needs and requirements of the priority ER ampersand WM activities at the sites, including potential needs for robotics and remote systems technology. It also discusses hazards associated with the site activities and any problems or technical uncertainties associated with dealing with the hazards in the performance of the ER ampersand WM work. Robotic or remote systems currently under development for remediation projects or waste operations are also discussed. The information in this document is organized principally by site, activity, and priority. Section 2.0, Site Needs, is based on information from the site visit reports and provides a summary which focuses on the site needs and requirements for each priority activity. Section 2.0 also records evaluations and discussions by the RTDP team following the site visit. Section 3.0, Commonality Assessment, documents similar site needs where common, or cross-cutting, robotics technology might be applied to several activities. Section 4.0 contains a summary of the site needs and requirements in tabular form. 1 tab

  19. The environmental restoration in the management of radiological accidents with off site consequences

    International Nuclear Information System (INIS)

    Vazquez, C.; Montero, M.; Moraleda, M.; Diaz, J.; Claver, F.; Valles, O.; Rodriguez, N.; Gutierrez, J.

    1998-01-01

    Radiological accidents are among the potential cases of environmental contamination that could have consequences on the health of the population. These accidents, associated with an increase in the level of radiological exposure surpassing the natural background, have been investigated in greater depth than other conventional accidents. This investigation has included the evaluation of their probability, magnitude and consequences in order to establish safety norms. Nevertheless, the social perception of this type of risk appears to be disproportionately high. The development of a comprehensible and adequate standardized system for the evaluation of the radiological risk and the applicability of corrective actions to reduce this type of risk at local level, will undoubtedly contribute to increase the public confidence in the advised options for the restoration of environments contaminated with the long lived radionuclides. This system should consider the local specificity of each contaminated place, and take into account the associated unwanted consequences for each option. This paper presents the first results of a system to help the decision makers in the quantitative evaluation of the radiological risk produced by long lived radionuclides Cs 137, Cs 134 and Sr 90 spread over urban, agricultural and semi-natural environments and the applicable options to reduce it. The evaluation of these applicable options is made considering the reduction of dose that can be reached, the monetary costs and the significant associated secondary effects if there are any. All these factors are integrated for a time period depending on the half-life of the contaminants and on their strength and distribution on the scenario when intervention is being planned. (authors)

  20. Oak Ridge Reservation Federal Facility Agreement. Quarterly report for the Environmental Restoration Program. Volume 4, July 1995--September 1995

    International Nuclear Information System (INIS)

    1995-10-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered herein is July through September 1995 (fourth quarter of FY 1995). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments

  1. Proposed Plan for an amendment to the Environmental Restoration Disposal Facility Record of Decision, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1997-07-01

    The U.S. Environmental Protection Agency, the Washington State Department of Ecology, and the U.S. Department of Energy (Tri- Parties) are proposing an amendment to the Environmental Restoration Disposal Facility Record of Decision (ERDF ROD). EPA is the lead regulatory agency for the ERDF Project. This Proposed Plan includes two elements intended to promote Hanford Site cleanup activities by broadening utilization and operation of ERDF as follows: (1) Construct the planned Phase II of ERDF using the current disposal cell design and (2) enable centralized treatment of remediation waste at ERDF prior to disposal, as appropriate

  2. Forecasting the effects of coastal protection and restoration projects on wetland morphology in coastal Louisiana under multiple environmental uncertainty scenarios

    Science.gov (United States)

    Couvillion, Brady R.; Steyer, Gregory D.; Wang, Hongqing; Beck, Holly J.; Rybczyk, John M.

    2013-01-01

    Few landscape scale models have assessed the effects of coastal protection and restoration projects on wetland morphology while taking into account important uncertainties in environmental factors such as sea-level rise (SLR) and subsidence. In support of Louisiana's 2012 Coastal Master Plan, we developed a spatially explicit wetland morphology model and coupled it with other predictive models. The model is capable of predicting effects of protection and restoration projects on wetland area, landscape configuration, surface elevation, and soil organic carbon (SOC) storage under multiple environmental uncertainty scenarios. These uncertainty scenarios included variability in parameters such as eustatic SLR (ESLR), subsidence rate, and Mississippi River discharge. Models were run for a 2010–2060 simulation period. Model results suggest that under a “future-without-action” condition (FWOA), coastal Louisiana is at risk of losing between 2118 and 4677 km2 of land over the next 50 years, but with protection and restoration projects proposed in the Master Plan, between 40% and 75% of that loss could be mitigated. Moreover, model results indicate that under a FWOA condition, SOC storage (to a depth of 1 m) could decrease by between 108 and 250 million metric tons, a loss of 12% to 30% of the total coastwide SOC, but with the Master Plan implemented, between 35% and 74% of the SOC loss could be offset. Long-term maintenance of project effects was best attained in areas of low SLR and subsidence, with a sediment source to support marsh accretion. Our findings suggest that despite the efficacy of restoration projects in mitigating losses in certain areas, net loss of wetlands in coastal Louisiana is likely to continue. Model results suggest certain areas may eventually be lost regardless of proposed restoration investment, and, as such, other techniques and strategies of adaptation may have to be utilized in these areas.

  3. Napa River Salt Marsh Restoration Project. Volume 1: Environmental Impact Statement

    National Research Council Canada - National Science Library

    Norton, Brad

    2004-01-01

    ...), and California Department of Fish and Game (DFG) (project sponsors) are proposing a salinity reduction and habitat restoration project for the 94569,460-acre Napa River Unit of the Napa-Sonoma Marshes Wildlife Area (NSMWA) (Napa River Unit...

  4. Sources of Financial Assistance for the Environmental Restoration of Former Military Lands

    National Research Council Canada - National Science Library

    Turnarkin, Joel

    1998-01-01

    ...; and private Investment funds. In addition, the listing contains various foundations, non-profit organizations, and corporate grant programs plus a collection of miscellaneous investment funds that may be willing to support restoration initiatives...

  5. Planning for environmental restoration of radioactively contaminated sites in central and eastern Europe. V. 3: Technologies for, and the implementation of, environmental restoration of contaminated sites. Proceedings of a workshop held within the technical co-operation project

    International Nuclear Information System (INIS)

    1996-05-01

    The radioactive contaminant materials resulting from diverse activities in relation to the nuclear fuel cycle, defence related operations, and various industries in addition to medical and research facilities represent perhaps the most severe and immense pollution left from a past era. The political changes in central and eastern Europe (CEE) not only brought some disclosure of the radioactively contaminated sites, but also resulted in a political condition in which this region became receptive to co-operation from a range of outside countries. The subjects of the first workshop held in Budapest, 4-8 October 1993, was the identification and characterization of radioactively contaminated sites in the region. The second part of the project and the second workshop (Piestany, Slovak Republic, 12-16 April 1994) involved planning and preparing the identified sites for restoration. This included items such as the restoration objectives, dose and environmental assessment, cost analysis, strategy and prioritization. Eventually, the third part of the project covered technologies for, and the implementation of, environmental restoration. The third and final workshop was held in Rez, Czech Republic, 12-16 December 1994. Refs, figs, tabs

  6. Environmental liability and nature protection areas
    Will the EU Environmental Liability Directive actually lead to the restoration of damaged natural resources?

    Directory of Open Access Journals (Sweden)

    G.M. van den Broek

    2009-06-01

    Full Text Available The EU Environmental Liability Directive (ELD requires remedial measures when environmental damage to protected species and natural habitats occurs. Thus, the ELD offers a minimum level of protection to natural resources in its Article 2. In order to finance the restoration of environmental damage to natural resources it might be crucial to meet the threshold criteria which can be derived from Article 2 of the ELD. However, the definition of damage in Article 2 of the ELD imposes a high threshold that will not be exceeded in many instances of damage. Furthermore, the availability of measurable data to provide conclusive evidence of damage is an issue. The practical applicability of the ELD will largely depend on the quality and accuracy of the information gathered under the reporting requirements of the EU Habitats and Birds Directives. For the restoration of affected natural resources the application of Paragraphs 1.3.2 and 1.3.3 of Annex II appears to be crucial. The actual restoration of the affected natural resources may be reduced or slowed down enormously by attaching significant importance to the costs of the various remedial options.

  7. Environmental Assessment for Ecosystem Restoration Masterplan Implementation at MacDill Air Force Base, Florida

    Science.gov (United States)

    2013-05-01

    1,000-foot long concrete touchdown zones with asphalt between them. The Proposed Action would occur in the vicinity of the southeastern portion of...Restoration Sites would not result in any increase in impermeable surfaces and would not reduce local groundwater recharge capabilities...floodplain. However, implementation of the Proposed Action would not result in any increases in impermeable surfaces and would restore the natural

  8. Accident analysis for high-level waste management alternatives in the US Department of Energy Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    International Nuclear Information System (INIS)

    Folga, S.; Mueller, C.; Roglans-Ribas, J.

    1994-01-01

    A comparative generic accident analysis was performed for the programmatic alternatives for high-level waste (HLW) management in the US Department of Energy Environmental Restoration and Waste Management Programmatic Environmental Impact Statement (EM PEIS). The key facilities and operations of the five major HLW management phases were considered: current storage, retrieval, pretreatment, treatment, and interim canister storage. A spectrum of accidents covering the risk-dominant accidents was analyzed. Preliminary results are presented for HLW management at the Hanford site. A comparison of these results with those previously advanced shows fair agreement

  9. Soil bioengineering for risk mitigation and environmental restoration in a humid tropical area

    Science.gov (United States)

    Petrone, A.; Preti, F.

    2010-02-01

    The use of soil bio-engineering techniques in developing countries is a relevant issue for disaster mitigation, environmental restoration and poverty reduction. Research on the autochthonal plants suitable for these kinds of interventions and on the economic efficiency of the interventions is essential for the dissemination of such techniques. The present paper is focused on these two issues as related to the realization of various typologies of soil bioengineering works in the humid tropics of Nicaragua. In the area of Río Blanco, located in the Department of Matagalpa, soil bioengineering installations were built in several sites. The particular structures built were: drainages with live fascine mattress, a live palisade, a vegetated live crib wall for riverbank protection, a vegetative covering made of a metallic net and biotextile coupled with a live palisade made of bamboo. In order to evaluate the suitability of the various plants used in these works, monitoring was performed, one on the live palisade alongside an unpaved road and the other on the live crib wall along a riverbank, by collecting data on survival rate and morphological parameters. Concerning economic efficiency, we proceeded to a financial analysis of the works. Once the unit price was obtained, we converted the amount into EPP Dollars (Equal Purchasing Power) in order to compare the Nicaraguan context with the European one. Among the species used we found that Gliricidia sepium (local common name: Madero negro) and Tabebuia rosea (local common name: Roble macuelizo) are adequate for soil bioengineering measures on slopes, while Erythrina fusca (local common name: Helequeme) resulted in successful behaviour only in the crib wall for riverbank protection. In comparing costs in Nicaragua and in Italy, the unit price reduction for Nicaragua ranges from 1.5 times (for the vegetative covering) to almost 4 times (for the fascine mattress), using the EPP dollar exchange rate. Our conclusions with

  10. Soil bioengineering for risk mitigation and environmental restoration in a humid tropical area

    Directory of Open Access Journals (Sweden)

    A. Petrone

    2010-02-01

    Full Text Available The use of soil bio-engineering techniques in developing countries is a relevant issue for disaster mitigation, environmental restoration and poverty reduction. Research on the autochthonal plants suitable for these kinds of interventions and on the economic efficiency of the interventions is essential for the dissemination of such techniques. The present paper is focused on these two issues as related to the realization of various typologies of soil bioengineering works in the humid tropics of Nicaragua.

    In the area of Río Blanco, located in the Department of Matagalpa, soil bioengineering installations were built in several sites. The particular structures built were: drainages with live fascine mattress, a live palisade, a vegetated live crib wall for riverbank protection, a vegetative covering made of a metallic net and biotextile coupled with a live palisade made of bamboo. In order to evaluate the suitability of the various plants used in these works, monitoring was performed, one on the live palisade alongside an unpaved road and the other on the live crib wall along a riverbank, by collecting data on survival rate and morphological parameters. Concerning economic efficiency, we proceeded to a financial analysis of the works. Once the unit price was obtained, we converted the amount into EPP Dollars (Equal Purchasing Power in order to compare the Nicaraguan context with the European one.

    Among the species used we found that Gliricidia sepium (local common name: Madero negro and Tabebuia rosea (local common name: Roble macuelizo are adequate for soil bioengineering measures on slopes, while Erythrina fusca (local common name: Helequeme resulted in successful behaviour only in the crib wall for riverbank protection.

    In comparing costs in Nicaragua and in Italy, the unit price reduction for Nicaragua ranges from 1.5 times (for the vegetative covering to almost 4 times (for the fascine mattress

  11. Soil bio-engineering for risk mitigation and environmental restoration in a humid tropical area

    Science.gov (United States)

    Petrone, A.; Preti, F.

    2009-07-01

    The use of soil bio-engineering techniques in developing countries is a relevant issue for disaster mitigation, environmental restoration and poverty reduction. Research on authochtonal plants suitable for this kind of works and on economic efficiency is essential for the divulgation of such techniques. The present paper is focused on this two issues related to the realization of various typologies of soil bio-engineering works in the humid tropic of Nicaragua. In the area of Río Blanco, located in the Department of Matagalpa, soil bio-engineering installations were built in several sites. The particular structures built were: drainages with live fascine mattress, a live palisade, a vegetated live crib wall for riverbank protection, a vegetative covering made of a metallic net and biotextile coupled with a live palisade made of bamboo. In order to evaluate the suitability of the various plants used in the works, monitorings were performed, one in the live palisade alongside an unpaved road and the other on the live crib wall along a riverbank, collecting survival rate and morphological parameters data. Concerning the economic efficiency we proceed to a financial analysis of the works and once the unit price was obtained, we converted the amount in EPP Dollars (Equal Purchasing Power) in order to compare the Nicaraguan context with the Italian one. Among the used species we found that Madero negro (Gliricidia sepium) and Roble macuelizo (Tabebuia rosea) are adequate for soil-bioengineering measure on slopes while Helequeme (Erythrina fusca) reported a successful behaviour only in the crib wall for riverbank protection. In the comparison of the costs in Nicaragua and in Italy, the unit price reduction for the Central American country ranges between 1.5 times (for the vegetative covering) and almost 4 times (for the fascine mattress) if it's used the EPP dollar exchange rate. Conclusions are reached with regard to hydrological-risk mitigating actions performed on a

  12. Mercury exposure due to environmental factors and amalgam restorations in a sample of North Carolina children.

    Science.gov (United States)

    Dilley, D C; Bawden, J W

    1999-01-01

    Dental amalgam restorations provide a potential source for mercury (Hg) exposure in children. This study explored the possibility that Hg levels in dentin of exfoliated primary maxillary canines could detect cumulative Hg exposure from amalgam restorations in a sample of North Carolina children. Twenty-seven exfoliated maxillary canines from 3.3 children, without restorations or caries, were assayed for dentin Hg concentration ([Hg]). Urine samples were obtained from 21 subjects and assayed for [Hg] and diet surveys for seafood ingestion were completed for 26 subjects. A surface/month exposure index (SMEI) was compiled from dental records to quantify each child's cumulative exposure to amalgam restorations. Results showed that dentin [Hg] ranged from undetectable levels to 15.7 ppm with a mean of 3.7 ppm. The SMEI scores ranged from 0-638 with a mean of 95. Ten subjects had low SMEI scores of 0-3, nine had scores 4-100, and eight had scores higher than 100. No statistical correlation was found for SMEI scores and dentin [Hg]. Urine Hg levels were found to be negligible and no relationship was found between urine [Hg] and reported ingestion of seafood or SMEI scores. Hg exposure in this sample of children was low and additional exposure from amalgam restorations could not be detected by the methods used in this study.

  13. A Synthesis of Environmental and Plant Community Data for Tidal Wetland Restoration Planning in the Lower Columbia River and Estuary

    Energy Technology Data Exchange (ETDEWEB)

    Diefenderfer, Heida L.; Borde, Amy B.; Cullinan, Valerie I.

    2013-12-01

    This report reanalyzes and synthesizes previously existing environmental and plant community data collected by PNNL at 55 tidal wetlands and 3 newly restored sites in the lower Columbia River and estuary (LCRE) between 2005 and 2011. Whereas data were originally collected for various research or monitoring objectives of five studies, the intent of this report is to provide only information that will have direct utility in planning tidal wetland restoration projects. Therefore, for this report, all tidal wetland data on plants and the physical environment, which were originally developed and reported by separate studies, were tabulated and reanalyzed as a whole. The geographic scope of the data collected in this report is from Bonneville Lock and Dam to the mouth of the Columbia River

  14. Health effects in community residents near a uranium plant at Fernald, Ohio, USA

    International Nuclear Information System (INIS)

    Pinney, S.M.; Freyberg, R.W.; Levine, G.H.; Nasuta, J. M.; Brannen, D.E.; Mark, L.S.; Tebbe, C.D.; Buckoholz, J.M.; Wones, R.

    2003-01-01

    Health outcomes in persons who lived in the area surrounding a U.S. Department of Energy (DOE) uranium processing plant near Fernald, Ohio were evaluated using data of Fernald Medical Monitoring Program (FMMP) participants. Residential history information was used to identify participants who lived in close proximity to the plant (less than 2 miles), in the direction of groundwater runoff (south of the plant), or used a well or cistern as a drinking water source. Standardized prevalence ratios (SPRs) for certain disease endpoints were calculated using U.S. National Health Interview Survey (NHIS) and the National Heath and Nutrition Examination Survey (NHANES) data files for comparison rates. Findings suggest that prior living within the Fernald exposure domain is related to increased prevalence of urinary system disease. Statistically significant elevations of bladder disease (standardized prevalence ratio or SPR = 1.32) and kidney disease (SPR = 2.15), including sub-categories, kidney stones (SPR = 3.98) and chronic nephritis (SPR =2.03) wee noted, as well as increased rates for hematuria and urethral stricture. In regression analyses with adjustment for age and sex, serum creatine levels were increased in those who had lived close to the plant. Increased white blood cell count and hemoglobin levels, and decreased mean corpuscular volume were also found in those living less than 2 miles from the plant. Those who used a well or cistern for drinking water were found to have increased urinary microalbumin, red blood cell count and hematocrit. These preliminary findings will provide the basis for future hypothesis testing incorporating important determinants of exposure not included in this study, such as duration and calendar year of exposure, location relevant to prevailing wind direction, and age at exposure. (author)

  15. Approach and Strategy for Performing Ecological Risk Assessments for the Department of Energy Oak Ridge Field Office Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Suter, G.W. II

    1992-01-01

    This technical memorandum provides guidance for planning and performing ecological risk assessments (ERAs) on the Oak Ridge Reservation (ORR). This work was performed under Work Breakdown Structure 1.4.12.2.3.04.07.02 (Activity Data Sheet 8304) and meets an Environmental Restoration Program milestone for FY 95. The strategy discussed in this report is consistent with the overall strategy for site management and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) compliance developed for the ORR and relevant U.S. Environmental Protection Agency documents and guidance. The general approach and strategy presented herein was developed for the ORR, but it could be applicable to other complex CERCLA sites that possess significant ecological resources.

  16. INL Site Portion of the April 1995 Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Mamagement Programmatic Final Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2005-06-30

    In April 1995, the Department of Energy (DOE) and the Department of the Navy, as a cooperating agency, issued the Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact Statement (1995 EIS). The 1995 EIS analyzed alternatives for managing The Department's existing and reasonably foreseeable inventories of spent nuclear fuel through the year 2035. It also included a detailed analysis of environmental restoration and waste management activities at the Idaho National Engineering and Environmental Laboratory (INEEL). The analysis supported facility-specific decisions regarding new, continued, or planned environmental restoration and waste management operations. The Record of Decision (ROD) was signed in June 1995 and amended in February 1996. It documented a number of projects or activities that would be implemented as a result of decisions regarding INL Site operations. In addition to the decisions that were made, decisions on a number of projects were deferred or projects have been canceled. DOE National Environmental Policy Act (NEPA) implementing procedures (found in 10 CFR Part 1 021.330(d)) require that a Supplement Analysis of site-wide EISs be done every five years to determine whether the site-wide EIS remains adequate. While the 1995 EIS was not a true site-wide EIS in that several programs were not included, most notably reactor operations, this method was used to evaluate the adequacy of the 1995 EIS. The decision to perform a Supplement Analysis was supported by the multi-program aspect of the 1995 EIS in conjunction with the spirit of the requirement for periodic review. The purpose of the SA is to determine if there have been changes in the basis upon which an EIS was prepared. This provides input for an evaluation of the continued adequacy of the EIS in light of those changes (i.e., whether there are substantial changes in the proposed

  17. Alternative approaches to urban natural areas restoration: integrating social and environmental goals

    Science.gov (United States)

    Paul H. Gobster

    2012-01-01

    Ecological restoration incorporates land management principles and activities aimed at returning a damaged or degraded ecosystem back to a key historic trajectory in order to achieve goals of ecosystem health, integrity, and sustainability. In the United States, many restorationists look to ecological conditions present before the time of European settlement as the key...

  18. 76 FR 78016 - Deepwater Horizon Oil Spill; Draft Phase I Early Restoration Plan and Environmental Assessment

    Science.gov (United States)

    2011-12-15

    ..., 2010, the mobile offshore drilling unit Deepwater Horizon, which was being used to drill a well for BP...), represents a preliminary step toward the restoration of injured natural resources. The Framework Agreement is... underway. As the first step in this accelerated process, the Trustees are first proposing eight projects as...

  19. The environmental and zooplankton community changes in restored ponds over 4 years.

    Czech Academy of Sciences Publication Activity Database

    Olmo, C.; Armengol, X.; Antón-Pardo, Maria; Ortells, R.

    2016-01-01

    Roč. 38, č. 3 (2016), s. 490-501 ISSN 0142-7873 Institutional support: RVO:60077344 Keywords : temporary ponds * community assemblage * restoration ecology * beta-diversity Subject RIV: DA - Hydrology ; Limnology Impact factor: 1.983, year: 2016

  20. 77 FR 13095 - Intent To Prepare an Environmental Impact Statement for NOAA Restoration Center Programmatic...

    Science.gov (United States)

    2012-03-05

    ... Restoration Center to implement its programs and work toward its mission with the greatest efficiency and... the PEIS will address. This notice provides information on how the public may participate. NOAA... U.S.C. 661). Dated: February 28, 2012. Brian Pawlak, Acting Director, Office of Habitat Conservation...

  1. Oak Ridge Reservation Federal Facility Agreement for the Environmental Restoration Program. Volume 1, Quarterly report, October--December 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    This Oak Ridge Reservation Federal Facility Agreement Quarterly Report for the Environmental Restoration Program was prepared to satisfy requirements for progress reporting on Environmental Restoration Program (ER) activities as specified in the Oak Ridge Reservation Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency, and the Tennessee Department of Environment and Conservation. The reporting period covered in this document is October through December 1995. This work was performed under Work Breakdown Structure 1.4.12.2.3.04 (Activity Data Sheet 8304). Publication of this document meets two FFA milestones. The FFA Quarterly Report meets an FFA milestone defined as 30 days following the end of the applicable reporting period. Appendix A of this report meets the FFA milestone for the Annual Removal Action Report for the period FYs 1991--95. This document provides information about ER Program activities conducted on the Oak Ridge Reservation under the FFA. Specifically, it includes information on milestones scheduled for completion during the reporting period, as well as scheduled for completion during the next reporting period (quarter); accomplishments of the ER Program; concerns related to program work; and scheduled activities for the next quarter. It also provides a listing of the identity and assigned tasks of contractors performing ER Program work under the FFA.

  2. Gallery forest restoration by the attainment of carbon credit: a social-environmental proposal for low-income community

    International Nuclear Information System (INIS)

    Coelho, Maria Carolina Crisci

    2007-01-01

    Due to intensification in climate changes by anthropogenic causes, to the recognition of the environmental importance of the Gallery Forest and its intense degradation, this work presents an analysis of the possibilities of carbon credit attainment by low-income community, as part of an incentive program for the restoration of these areas. Two ways are demonstrated: projects of Clean Development Mechanism (CDM), in the scope of the Kyoto Protocol, that generate credits called certified emission reductions; and projects based on voluntary scheme, that generate voluntary emission reductions. Both are difficult to organize and implement. For example: the eligibility of an area, baseline study, monitoring, non-permanence risks of storage carbon, technical and operational structures, operational and business costs, regulated market in consolidation and guarantee of credit acquisition. Nevertheless, this second market presents greater flexibility and acceptance for the forest projects. The social-environmental benefits of these projects are significant and the valuation of their environmental services can revert in financial incentives for low-income community, since that adequately remunerated. The carbon credit can help in the implementation of these projects, contributing for local restoration of the areas and also for carbon capture by the atmosphere, which this is a global subject. (author)

  3. Using SaudiVeg Ecoinformatics in assessment, monitoring and proposing environmental restoration tools in central Saudi Arabia

    Science.gov (United States)

    El-Sheikh, Mohamed; Hennekens, Stephan; Alfarhan, Ahmed; Thomas, Jacob; Schaminee, Joop; El-Keblawy, Ali

    2017-04-01

    Successful restoration of degraded habitats requires information about the history and factors led to the deterioration of these habitats. This study analyzed SaudiVeg Ecoinformatics, which is a big phytosociological database about plant communities and other environmental factors affecting them in the Najd-Central Region of Saudi Arabia. A phytosociological survey with more than 3000 vegetation relevés was conducted during 2013. The data were used to correlate the plant community attributes, such as abundance and species diversity in natural and ruderal habitats with environmental factors, such as human impacts, soil physical and chemical properties, and land uses. The data were subjected to multivariate analyses using programs, such as TWINSPAN, DCA and CCA, via Juice package. Fourteen vegetation associations were described under provisional classification of the Central Saudi Arabia deserts. These associations were broadly grouped into desert vegetation types. One alliance group, Haloxylonion salicornici, is the most widespread and contains four associations on the wadis and desert plains. Three associations are dominant on the depression habitats (raudhas) and two associations of Tamarixidetum spp. on the wetland and salt pan habitats. Four associations inhabit the man-made habitat and abandoned field habitats and one association, the Neurado procumbentis-Heliotropietum digyni, dominates the overgrazed sandy dunes. As human impact is huge and increasing, the vegetation ecoinformatics of the present study would form a baseline description that could be used as a vital tool for future monitoring and for proposing environmental restoration processes in central Saudi Arabia. It could also help both Governmental and Non-governmental organizations (NGO) in formulating strategies and on-ground plans for protection, management and restoration of the natural vegetation.

  4. 3-D subsurface modeling within the framework of an environmental restoration information system: Prototype results using earthvision

    International Nuclear Information System (INIS)

    Goeltz, R.T.; Zondlo, T.F.

    1994-01-01

    As a result of the DOE Oak Ridge Reservation (DOE-ORR) placement on the EPA Superfund National Priorities List in December of 1989, all remedial activities, including characterization, remedial alternatives selection, and implementation of remedial measures, must meet the combined requirements of RCRA, CERCLA, and NEPA. The Environmental Restoration Program, therefore, was established with the mission of eliminating or reducing to prescribed safe levels the risks to the environment or to human health and safety posed by inactive and surplus DOE-ORR managed sites and facilities that have been contaminated by radioactive and surplus DOE-ORR managed sites and facilities that have been contaminated by radioactive, hazardous, or mixed wastes. In accordance with an established Federal Facilities Agreement (FFA), waste sites and facilities across the DOE-ORR have been inventoried, prioritized, and are being systematically investigated and remediated under the direction of Environmental Restoration. EarthVision, a product of Dynamic Graphics, Inc., that provides three-dimensional (3-D) modeling and visualization, was exercised within the framework of an environmental restoration (ER) decision support system. The goal of the prototype was to investigate framework integration issues including compatibility and value to decision making. This paper describes the ER program, study site, and information system framework; selected EarthVision results are shown and discussed. EarthVision proved effective in integrating complex data from disparate sources and in providing 3-D visualizations of the spatial relationships of the data, including contaminant plumes. Work is under way to expand the analysis to the full site, covering about 1600 acres, and to include data from new sources, particularly remote-sensing studies

  5. Environmental restoration plans and activities in Hungary: 1995-1996 progress report

    International Nuclear Information System (INIS)

    Juhasz, L.; Szerbin, P.; Lendvai, Z.; Csovari, M.; Benkovics, I.

    1997-01-01

    After more dm 35 years of operation, the uranium mining and milling activities in Hungary will be finally shut down by the end of 1997. The surveying programme on the affected area was started in 1991, and the first phase of the remediation project was launched in 1992-93. In the last few years a new concept and strategy has been prepared for the next phase of restoration tasks. The restoration will mainly follow the principle of application of step by step approach to the solution of each task. Due to lack of approved national regulations, authorization in the form of letters are obtained on specific issues of remedial action on a case by case basis. The radiological requirements for both reuse and restoration of the affected areas call for setting up radiation limits. The radiation monitoring and radiological characterization of the affected areas both during operation as well as after restoration are being systematically performed. The monitoring of water contamination is given high priority, because the uranium milling and milling sites have a lot of surface water and aquifers. So far, 3 mines have been shut down while 2 mines are still operating. After final close down the mines will be flooded, and the monitoring system will be expanded and upgraded. Major portion of waste rock piles have been restored, and a number of experiments and investigations have been performed for decreasing the contamination of heap leaching and for selection of cover layers of tailings ponds. As a prelude to decommissioning of milling facility preliminary survey of items and equipment for reuse or disposal has been started. (author)

  6. Data Summary for the Near-Shore Sediment Characterization Task of the Clinch River Environmental Restoration Program

    International Nuclear Information System (INIS)

    Levine, D.A.

    1994-01-01

    The purpose of the Near-Shore Sediment Characterization Task of the Clinch River Environmental Restoration Program (CR-ERP) was to quantify potential human health risks associated with Department of Energy (DOE)-related contamination of surface sediments in Watts Bar Reservoir (WBR). An estimated 700 Ci of 137 Cs and 325 Ci of 60 Co were released from White Oak Lake into the Clinch River between 1949 and 1992 (DOE, 1988). A number of previous studies have documented sediment contamination in the deep-water sediments but no study specifically targeted the near-shore environment, which has the most potential for exposure to humans

  7. Information Management Architecture for an Integrated Computing Environment for the Environmental Restoration Program. Volume 2, Interim business systems guidance

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    As part of the Environmental Restoration Program at Martin Marietta, IEM (Information Engineering Methodology) was developed as part of a complete and integrated approach to the progressive development and subsequent maintenance of automated data sharing systems. This approach is centered around the organization`s objectives, inherent data relationships, and business practices. IEM provides the Information Systems community with a tool kit of disciplined techniques supported by automated tools. It includes seven stages: Information Strategy Planning; Business Area Analysis; Business System Design; Technical Design; Construction; Transition; Production. This document focuses on the Business Systems Architecture.

  8. The rise and fall of a risk-based priority system: Lessons from DOE's Environmental Restoration Priority System

    International Nuclear Information System (INIS)

    Jenni, K.E.; Merkhofer, M.W.; Williams, C.

    1995-01-01

    This paper presents the history of the Environmental Restoration Priority System (ERPS), a decision aid developed by the U.S. Department of Energy (DOE) to help determine how to allocate funds for cleaning up hazardous waste sites. Although praised in technical peer review, the system was strongly criticized by stakeholders external to DOE. Ultimately, and in the midst of a National Academy of Sciences review, DOE shelved the system. The rise and fall of ERPS provides useful lessons for analysts hoping to improve risk management in the public sector. 49 refs., 3 figs., 3 tabs

  9. Environmental restoration plan for the transfer of surplus facilities to the Facility Transition Program at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1995-08-01

    This report will provide guidance on management, coordination, and integration of plans to transition facilities to the Facility Transition Program and activities as related to the Oak Ridge National Laboratory (ORNL) Environmental Restoration Program facilities. This report gives (1) guidance on the steps necessary for identifying ORNL surplus facilities, (2) interfaces of Surveillance and Maintenance (S and M) and Isotope Facility Deactivation program managers, (3) roles and responsibilities of the facility managers, and (4) initial S and M requirements upon acceptance into the Facility Transition Program

  10. Information Management Architecture for an Integrated Computing Environment for the Environmental Restoration Program. Volume 2, Interim business systems guidance

    International Nuclear Information System (INIS)

    1994-09-01

    As part of the Environmental Restoration Program at Martin Marietta, IEM (Information Engineering Methodology) was developed as part of a complete and integrated approach to the progressive development and subsequent maintenance of automated data sharing systems. This approach is centered around the organization's objectives, inherent data relationships, and business practices. IEM provides the Information Systems community with a tool kit of disciplined techniques supported by automated tools. It includes seven stages: Information Strategy Planning; Business Area Analysis; Business System Design; Technical Design; Construction; Transition; Production. This document focuses on the Business Systems Architecture

  11. Hanford Site Environmental Restoration Program 1994 fiscal year work plan. Work breakdown structure 2.0: Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-22

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D&D); Project Management and Support (PM&S); Surveillance and Maintenance (S&M); and Disposal Facilities (DF).

  12. Design criteria applicable to the environmental restoration of sites affected by uranium mining activities in the past

    International Nuclear Information System (INIS)

    Carboneras, P.; Sanchez, M.

    1993-01-01

    In this paper the authors discuss the basic aspects to be considered while evaluating different alternatives to perform environmental restoration of sites affected by naturally occurring radionuclides, enhanced by human actions, as is the case in some old uranium mining activities. The discussion is confined to sites where radiation hazards had existed forever (sites with uranium deposits) and where the mining activities have introduced several factors modifying the initial situation, leading to the now existing one, requiring intervention as decided by the relevant authorities, in accordance with recommendations of ICRP60

  13. Design criteria applicable to the environmental restoration of sites affected by uranium mining activities in the past

    Energy Technology Data Exchange (ETDEWEB)

    Carboneras, P. [ENRESA, Madrid (Spain); Sanchez, M. [INITEC, Madrid (Spain)

    1993-12-31

    In this paper the authors discuss the basic aspects to be considered while evaluating different alternatives to perform environmental restoration of sites affected by naturally occurring radionuclides, enhanced by human actions, as is the case in some old uranium mining activities. The discussion is confined to sites where radiation hazards had existed forever (sites with uranium deposits) and where the mining activities have introduced several factors modifying the initial situation, leading to the now existing one, requiring intervention as decided by the relevant authorities, in accordance with recommendations of ICRP60.

  14. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs draft environmental impact statement

    International Nuclear Information System (INIS)

    1994-06-01

    The US Department of Energy (DOE) has prepared this report to assist its management in making two decisions. The first decision, which is programmatic, is to determine the management program for DOE spent nuclear fuel. The second decision is on the future direction of environmental restoration, waste management, and spent nuclear fuel management activities at the Idaho National Engineering Laboratory. Volume 1 of the EIS, which supports the programmatic decision, considers the effects of spent nuclear fuel management on the quality of the human and natural environment for planning years 1995 through 2035. DOE has derived the information and analysis results in Volume 1 from several site-specific appendixes. Volume 2 of the EIS, which supports the INEL-specific decision, describes environmental impacts for various environmental restoration, waste management, and spent nuclear fuel management alternatives for planning years 1995 through 2005. This Appendix B to Volume 1 considers the impacts on the INEL environment of the implementation of various DOE-wide spent nuclear fuel management alternatives. The Naval Nuclear Propulsion Program, which is a joint Navy/DOE program, is responsible for spent naval nuclear fuel examination at the INEL. For this appendix, naval fuel that has been examined at the Naval Reactors Facility and turned over to DOE for storage is termed naval-type fuel. This appendix evaluates the management of DOE spent nuclear fuel including naval-type fuel

  15. Waste-surface mapping of the Fernald K-65 silos using a structured light measurement system

    International Nuclear Information System (INIS)

    Burks, B.L.; DePiero, F.W.; Dinkins, M.A.; Rowe, J.C.; Selleck, C.B.; Jacoboski, D.L.

    1992-10-01

    A remotely operated surface-mapping measurement system was developed by the Robotics ampersand Process Systems Division at Oak Ridge National Laboratory for use in the K-65 waste-storage silos at Fernald, Ohio. The mapping system used three infrared line-generating laser diodes as illumination sources and three high-resolution, low-lux, calibrated, black-and-white, charge-coupled-device video cameras as receivers. These components were combined to form structured light source range and direction sensors with six different possible emitter-receiver pairs. A technology demonstration and predeployment tests were performed at Fernald using the empty Silo 4 into which was placed rectangular objects of known dimensions. These objects were scanned by the structured light sources to demonstrate functionality and verify that the system was giving sufficiently accurate range data in three dimensions. The structured light sources were deployed in Silos 1 and 2 to scan the waste surfaces. The resulting data were merged to create three-dimensional maps of those surfaces. A bentonite clay cap was placed over the waste surfaces and surface maps were obtained. The change in surface height before and after bentonite addition was utilized as a measure of clay cap thickness

  16. Restoration of mires - the question of ethics, aesthetics and environmental awareness

    International Nuclear Information System (INIS)

    Lode, Elve

    1998-01-01

    In the introductory part of her paper, under the subtitles Shortly about the condition of peatlands in Europe of today and The future of Estonian peatlands, Elvi Lode, a wetland hydrologist of the Institute of Ecology at Tallinn University of Educational Sciences, considers the condition of peatlands in Europe and the future of Estonian peatlands. The annual peat production quota established by the Government of Estonia (2.78 million t) is compared with reserves established in the course of the latest inventory of Estonian peat cuttings and the existing natural and managed peatlands. In view of the allowed usable peat reserves in Estonia the area for peat cuttings in the future may be about 20 % larger than the present area under natural bog centre sites. Based on world experience and knowledge in the parts subtitled Restoration - a question of ethics and Restoration of mires a question of aesthetics the tasks related to the restoration of peatlands have been stated and institutions in charge have been determined. (author)

  17. Oak Ridge Reservation Federal Facility Agreement quarterly report for the Environmental Restoration Program, Volume 1, October--December 1992

    International Nuclear Information System (INIS)

    1993-01-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program which are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered is October through December 1992(first quarter of FY 1993). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been formally approved as FY 1993 commitments. This first section is followed by: significant accomplishments; technical status at Y-12 operable units, Oak Ridge National Laboratory, Oak Ridge K-25 site, Clinch River, Oak Ridge Associated Universities, and technical oversight and technical programs; and response action contractor assignments

  18. Using performance measures to evaluate programmatic outputs and outcomes in the Department of Energy's environmental restoration program

    International Nuclear Information System (INIS)

    Turi, G.; Resch, R.; Shangraw, W.R.

    1994-01-01

    Over the last year, a revolution has occurred in the use of performance measures in the Department of Energy's (DOE) Office of Environmental Management (EM). The performance measures range from traditional cost and schedule performance criteria to strategic measures of program outcomes. Each area of performance measurement has resulted (or is resulting) in a different approach for evaluating performance using a different set of performance criteria. Although some data elements cross cut the groups, each of the approaches focuses on different data collection process. The Office of Environmental Restoration is attempting to link these groups together through a unified system of performance measurement. This paper will define and discuss each type of performance measurement and its supporting systems or approaches

  19. Sex in an uncertain world: environmental stochasticity helps restore competitive balance between sexually and asexually reproducing populations.

    Science.gov (United States)

    Park, A W; Vandekerkhove, J; Michalakis, Y

    2014-08-01

    Like many organisms, individuals of the freshwater ostracod species Eucypris virens exhibit either obligate sexual or asexual reproductive modes. Both types of individual routinely co-occur, including in the same temporary freshwater pond (their natural habitat in which they undergo seasonal diapause). Given the well-known two-fold cost of sex, this begs the question of how sexually reproducing individuals are able to coexist with their asexual counterparts in spite of such overwhelming costs. Environmental stochasticity in the form of 'false dawn' inundations (where the first hydration is ephemeral and causes loss of early hatching individuals) may provide an advantage to the sexual subpopulation, which shows greater variation in hatching times following inundation. We explore the potential role of environmental stochasticity in this system using life-history data analysis, climate data, and matrix projection models. In the absence of environmental stochasticity, the population growth rate is significantly lower in sexual subpopulations. Climate data reveal that 'false dawn' inundations are common. Using matrix projection modelling with and without environmental stochasticity, we demonstrate that this phenomenon can restore appreciable balance to the system, in terms of population growth rates. This provides support for the role of environmental stochasticity in helping to explain the maintenance of sex and the occurrence of geographical parthenogenesis. © 2014 The Authors. Journal of Evolutionary Biology © 2014 European Society For Evolutionary Biology.

  20. Assessment, evaluation, and testing of technologies for environmental restoration, decontamination, and decommissioning and high level waste management. Progress report

    Energy Technology Data Exchange (ETDEWEB)

    Uzochukwu, G.A.

    1997-12-31

    Nuclear and commercial non-nuclear technologies that have the potential of meeting the environmental restoration, decontamination and decommissioning, and high-level waste management objectives are being assessed and evaluated. A detailed comparison of innovative technologies available will be performed to determine the safest and most economical technology for meeting these objectives. Information derived from this effort will be matched with the multi-objectives of the environmental restoration, decontamination and decommissioning, and high-level waste management effort to ensure that the best, most economical, and the safest technologies are used in decision making at USDOE-SRS. Technology-related variables will be developed and the resulting data formatted and computerized for multimedia systems. The multimedia system will be made available to technology developers and evaluators to ensure that the best, most economical, and the safest technologies are used in decision making at USDOE-SRS. Technology-related variables will be developed and the resulting data formatted and computerized for multimedia systems. The multimedia system will be made available to technology developers and evaluators to ensure that the safest and most economical technologies are developed for use at SRS and other DOE sites.

  1. Assessment, evaluation, and testing of technologies for environmental restoration, decontamination, and decommissioning and high level waste management. Progress report

    International Nuclear Information System (INIS)

    Uzochukwu, G.A.

    1997-01-01

    Nuclear and commercial non-nuclear technologies that have the potential of meeting the environmental restoration, decontamination and decommissioning, and high-level waste management objectives are being assessed and evaluated. A detailed comparison of innovative technologies available will be performed to determine the safest and most economical technology for meeting these objectives. Information derived from this effort will be matched with the multi-objectives of the environmental restoration, decontamination and decommissioning, and high-level waste management effort to ensure that the best, most economical, and the safest technologies are used in decision making at USDOE-SRS. Technology-related variables will be developed and the resulting data formatted and computerized for multimedia systems. The multimedia system will be made available to technology developers and evaluators to ensure that the best, most economical, and the safest technologies are used in decision making at USDOE-SRS. Technology-related variables will be developed and the resulting data formatted and computerized for multimedia systems. The multimedia system will be made available to technology developers and evaluators to ensure that the safest and most economical technologies are developed for use at SRS and other DOE sites

  2. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This document analyzes at a pregrammatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For pregrammatic spent nuclear fuel management, this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum treatment, storage, and disposal of US Department of Energy wastes.

  3. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1994-06-01

    This document analyzes at a pregrammatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For pregrammatic spent nuclear fuel management, this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum treatment, storage, and disposal of US Department of Energy wastes

  4. Hazardous waste database: Waste management policy implications for the US Department of Energy's Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    International Nuclear Information System (INIS)

    Lazaro, M.A.; Policastro, A.J.; Antonopoulos, A.A.; Hartmann, H.M.; Koebnick, B.; Dovel, M.; Stoll, P.W.

    1994-01-01

    The hazardous waste risk assessment modeling (HaWRAM) database is being developed to analyze the risk from treatment technology operations and potential transportation accidents associated with the hazardous waste management alternatives. These alternatives are being assessed in the Department of Energy's Environmental Restoration and Waste Management Programmatic Environmental Impact Statement (EM PEIS). To support the risk analysis, the current database contains complexwide detailed information on hazardous waste shipments from 45 Department of Energy installations during FY 1992. The database is currently being supplemented with newly acquired data. This enhancement will improve database information on operational hazardous waste generation rates, and the level and type of current on-site treatment at Department of Energy installations

  5. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 2, Part A

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This document analyzes at a programmatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For programmatic spent nuclear fuel management this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum and maximum treatment, storage, and disposal of US Department of Energy wastes.

  6. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1994-06-01

    This document analyzes at a programmatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For programmatic spent nuclear fuel management this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum and maximum treatment, storage, and disposal of US Department of Energy wastes

  7. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs draft environmental impact statement

    International Nuclear Information System (INIS)

    1994-06-01

    This document analyzes at a programmatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For programmatic spent nuclear fuel management, this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum treatment, storage, and disposal of US Department of Energy wastes

  8. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1994-06-01

    Two types of projects in the spent nuclear fuel and environmental restoration and waste management activities at the Idaho National Engineering Laboratory (INEL) are described. These are: foreseeable proposed projects where some funding for preliminary planning and/or conceptual design may already be authorized, but detailed design or planning will not begin until the Department of Energy (DOE) has determined that the requirements of the National Environmental Policy Act process for the project have been completed; planned or ongoing projects not yet completed but whose National Environmental Policy Act documentation is already completed or is expected to be completed before the Record of Decision for this Envirorunental Impact Statement (EIS) is issued. The section on project summaries describe the projects (both foreseeable proposed and ongoing).They provide specific information necessary to analyze the environmental impacts of these projects. Chapter 3 describes which alternative(s) each project supports. Summaries are included for (a) spent nuclear fuel projects, (b) environmental remediation projects, (c) the decontamination and decommissioning of surplus INEL facilities, (d) the construction, upgrade, or replacement of existing waste management facilities, (e) infrastructure projects supporting waste management activities, and (f) research and development projects supporting waste management activities

  9. Final environmental assessment and Finding-of-No-Significant-Impact - drum storage facility for interim storage of materials generated by environmental restoration operations

    International Nuclear Information System (INIS)

    1994-09-01

    The Department of Energy (DOE) has prepared an Environmental Assessment (EA), DOE/EA-0995, for the construction and operation of a drum storage facility at Rocky Flats Environmental Technology Site, Golden, Colorado. The proposal for construction of the facility was generated in response to current and anticipated future needs for interim storage of waste materials generated by environmental restoration operations. A public meeting was held on July 20, 1994, at which the scope and analyses of the EA were presented. The scope of the EA included evaluation of alternative methods of storage, including no action. A comment period from July 5, 1994 through August 4, 1994, was provided to the public and the State of Colorado to submit written comment on the EA. No written comments were received regarding this proposed action, therefore no comment response is included in the Final EA. Based on the analyses in the EA, DOE has determined that the proposed action would not significantly affect the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an Environmental Impact Statement is not required and the Department is issuing this Finding of No Significant Impact

  10. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 2, Part B

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    Two types of projects in the spent nuclear fuel and environmental restoration and waste management activities at the Idaho National Engineering Laboratory (INEL) are described. These are: foreseeable proposed projects where some funding for preliminary planning and/or conceptual design may already be authorized, but detailed design or planning will not begin until the Department of Energy (DOE) has determined that the requirements of the National Environmental Policy Act process for the project have been completed; planned or ongoing projects not yet completed but whose National Environmental Policy Act documentation is already completed or is expected to be completed before the Record of Decision for this Envirorunental Impact Statement (EIS) is issued. The section on project summaries describe the projects (both foreseeable proposed and ongoing).They provide specific information necessary to analyze the environmental impacts of these projects. Chapter 3 describes which alternative(s) each project supports. Summaries are included for (a) spent nuclear fuel projects, (b) environmental remediation projects, (c) the decontamination and decommissioning of surplus INEL facilities, (d) the construction, upgrade, or replacement of existing waste management facilities, (e) infrastructure projects supporting waste management activities, and (f) research and development projects supporting waste management activities.

  11. Third annual environmental restoration monitoring and assessment report for FY 1994 of the Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Clapp, R.B.; Watts, J.A.; Guth, M.A.S.

    1994-09-01

    This report summarizes the salient features of the annual efforts of environmental monitoring, field investigations, and assessments conducted to support the Environmental Restoration (ER) Program at the Oak Ridge National Laboratory (ORNL). This report focuses on the watershed scale, providing an ORNL site-wide perspective on types, distribution, and transport of contamination. The results presented are used to enhance the conceptual understanding of the key contaminants and the sources, fluxes, and processes affecting their distribution and movement. This information forms a basis for prioritizing sites and for selecting, implementing, and evaluating remedial actions. This report summarizes the efforts of the Waste Area Grouping (WAG) 2 and Site Investigations (SI) Project. WAG 2 is the lower portion of the White Oak Creek system which drains the major contaminated sites at ORNL and discharges to the Clinch River where public access is allowed. The Remedial Investigation Plan (DOE 1992) for WAG 2 includes a long-term multimedia environmental monitoring effort that takes advantage of WAG 2's role as an integrator and the major conduit of contaminants from the ORNL site. During FY 1992, the remedial investigation activities were integrated with a series of environmental monitoring and SI activities at ORNL that address pathways and processes important for contaminant movement to gain a more integrated perspective of contamination movement at the watershed scale

  12. Third annual environmental restoration monitoring and assessment report for FY 1994 of the Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Clapp, R.B.; Watts, J.A.; Guth, M.A.S. [eds.

    1994-09-01

    This report summarizes the salient features of the annual efforts of environmental monitoring, field investigations, and assessments conducted to support the Environmental Restoration (ER) Program at the Oak Ridge National Laboratory (ORNL). This report focuses on the watershed scale, providing an ORNL site-wide perspective on types, distribution, and transport of contamination. The results presented are used to enhance the conceptual understanding of the key contaminants and the sources, fluxes, and processes affecting their distribution and movement. This information forms a basis for prioritizing sites and for selecting, implementing, and evaluating remedial actions. This report summarizes the efforts of the Waste Area Grouping (WAG) 2 and Site Investigations (SI) Project. WAG 2 is the lower portion of the White Oak Creek system which drains the major contaminated sites at ORNL and discharges to the Clinch River where public access is allowed. The Remedial Investigation Plan (DOE 1992) for WAG 2 includes a long-term multimedia environmental monitoring effort that takes advantage of WAG 2`s role as an integrator and the major conduit of contaminants from the ORNL site. During FY 1992, the remedial investigation activities were integrated with a series of environmental monitoring and SI activities at ORNL that address pathways and processes important for contaminant movement to gain a more integrated perspective of contamination movement at the watershed scale.

  13. Paddys Run Streambank Stabilization Project at the Fernald Preserve, Harrison, OH

    Energy Technology Data Exchange (ETDEWEB)

    Hooten, Gwendolyn [Dept. of Energy (DOE), Legacy Management; Hertel, Bill [Navarro Research and Engineering; Homer, John [Navarro Research and Engineering

    2016-03-01

    The Fernald Preserve is a former uranium-processing plant that underwent extensive remediation pursuant to CERCLA and is now managed by the US DOE Office of Legacy Management. While remediation of buildings and soil contamination was completed in 2006, aquifer remediation is ongoing. Paddys Run is a second-order stream that runs to the south along the western side of the Fernald Preserve. The Paddys Run watershed encompasses nearly 41 km2 (16 mi2), including most of the Fernald site. Field personnel conducting routine site inspections in March 2014 observed that Paddys Run was migrating east via bank erosion into the “Pit 3 Swale,” an area of known surface-water contamination. The soil there was certified pursuant to site regulatory agreements and meets all final remediation levels. However, weekly surface-water monitoring is conducted from two puddles within the swale area, when water that exceeds the final remediation levels is present. Paddys Run had migrated east approximately 4 m (13 ft) in 2 years and was approximately 29 m (95 ft) from the sample location. This rapid migration threatened existing conditions that allowed for continued monitoring of the swale area and also threatened Paddys Run water quality. Therefore, DOE and regulators determined that the east bank of Paddys Run required stabilization. This was accomplished with a design that included the following components: relocation of approximately 145 m (475 ft) of streambed 9 m (30 ft) west, installation of a rock toe along the east bank, installation of two cross-vane in-stream grade-control structures, stabilization of a portion of the east bank using soil encapsulated lifts, and regrading, seeding, and planting within remaining disturbed areas. In an effort to take advantage of low-flow conditions in Paddys Run, construction was initiated in September 2014. Weather delays and subsurface flow within the Paddys Run streambed resulted in an interim shutdown of the project area in December 2014

  14. Principles and criteria for environmental restoration of the contaminated banks near NPP Bohunice

    International Nuclear Information System (INIS)

    Slavik, O.; Moravek, J.

    1995-01-01

    The 18 km long banks of the Bohunice NPP waste water recipient are contaminated by 137 Cs as a result of two accidents on the CO 2 cooled NPP-A1 unit in 1976 and 1977. Contamination acceptance limits 6 or 8 Bq 137 Cslg of soil, depending on contaminated area size, were derived on the basis of developed principles, and approved by the authorities. Removing and safe burial of 1,100 m 3 of contaminated soil from steep area and 15 cm thick clean soil covering on about 1ha of flat area of the contaminated banks is planned in frame of the re-considered restoration project implementation in 1995/96. (author)

  15. Traffic-emitted metal status and uptake by Carex meyeriana Kunth and Thelypteris palustris var. pubescens Fernald growing in roadside turfy swamp in the Changbai Mountain area, China.

    Science.gov (United States)

    Wang, Hong; Nie, Lei; Xu, Yan; Li, Miao; Lv, Yan

    2018-04-26

    Six traffic-emitted metals (Cr, Zn, Cu, Cd, Pb, and Ni) were determined in soil and plants for below- and aboveground parts along different distances from highway to evaluate their behavior and uptake by Carex meyeriana Kunth and Thelypteris palustris var. pubescens Fernald growing in turfy swamps. The results indicated that the different plant tissues showed significantly different levels of metal content. Nonlinear regression analysis indicated that metal contents leveled off at constant values before they decreased as the distance from the roadside increased. The high R 2 values of the regression model indicated good fit of the exponential function applied to depict the distribution pattern of the metal elements. It was deduced that Cr, Cu, and Cd in Thelypteris palustris var. pubescens Fernald were mainly derived from the soil; Carex meyeriana Kunth and Thelypteris palustris var. pubescens Fernald absorbed Pb mainly through the stomata from atmospheric depositions; Cr, Cu, and Cd in Carex meyeriana Kunth and Zn in Thelypteris palustris var. pubescens Fernald were mainly affected by soil and atmospheric depositions. After excluding the effects of traffic, only the bioaccumulation factor of Cd (1.34) in Carex meyeriana Kunth and the translocation factor of Zn (1.13) in Thelypteris palustris var. pubescens Fernald were greater than 1, suggesting that Carex meyeriana Kunth could be a good candidate for assimilating Cd from soils and Thelypteris palustris var. pubescens Fernald could be suitable for the phytoextraction of Zn.

  16. Assessing regional environmental quality by integrated use of remote sensing, GIS, and spatial multi-criteria evaluation for prioritization of environmental restoration.

    Science.gov (United States)

    Rahman, Md Rejaur; Shi, Z H; Chongfa, Cai

    2014-11-01

    This study was an attempt to analyse the regional environmental quality with the application of remote sensing, geographical information system, and spatial multiple criteria decision analysis and, to project a quantitative method applicable to identify the status of the regional environment of the study area. Using spatial multi-criteria evaluation (SMCE) approach with expert knowledge in this study, an integrated regional environmental quality index (REQI) was computed and classified into five levels of regional environment quality viz. worse, poor, moderate, good, and very good. During the process, a set of spatial criteria were selected (here, 15 criterions) together with the degree of importance of criteria in sustainability of the regional environment. Integrated remote sensing and GIS technique and models were applied to generate the necessary factors (criterions) maps for the SMCE approach. The ranking, along with expected value method, was used to standardize the factors and on the other hand, an analytical hierarchy process (AHP) was applied for calculating factor weights. The entire process was executed in the integrated land and water information system (ILWIS) software tool that supports SMCE. The analysis showed that the overall regional environmental quality of the area was at moderate level and was partly determined by elevation. Areas under worse and poor quality of environment indicated that the regional environmental status showed decline in these parts of the county. The study also revealed that the human activities, vegetation condition, soil erosion, topography, climate, and soil conditions have serious influence on the regional environment condition of the area. Considering the regional characteristics of environmental quality, priority, and practical needs for environmental restoration, the study area was further regionalized into four priority areas which may serve as base areas of decision making for the recovery, rebuilding, and

  17. Electrokinetic applications for environmental restoration, waste volume reduction, and contaminant containment systems

    International Nuclear Information System (INIS)

    Lomasney, H.L.; Lomasney, C.A.

    1996-01-01

    In the US and all over the world, following over 50 years of nuclear arms production operations, the magnitude of resultant environmental damage is only beginning to surface. The US Department of Energy estimates that by the year 2070, the total volume of high-level waste, transuranic waste, low-level waste, and low-level mixed waste, generated as a result of past and current nuclear activities, will exceed 20 million cubic meters. In Russia, it is reported that more than 30% of all groundwater is contaminated with agricultural and industrial chemical waste. Government agencies today are faced with the responsibility of developing technologies that are suitable for dealing with severe environmental contamination and accumulating waste inventories. In response to this demand, applications of electrokinetics have emerged in the field of environmental waste management as alternatives for environmental decontamination and ecological protection. Electrokinetics involves the movement of charged species under the influence of an applied electric field and is applicable in several areas of environmental waste management, including cleanup of soil and groundwater, barrier detection, and emergency or protective fencing. The worldwide interest in this technology has steadily escalated over the past decade. Today, state-of-the-art applications of electrokinetics have been demonstrated in the US, The Netherlands, Russia, The Ukraine, and India. This paper addresses the latest advances in the various applications of this technology as well as the most significant breakthroughs in the history of electrokinetics

  18. Strategic alliance for environmental restoration -- An innovative appr