WorldWideScience

Sample records for federal power program

  1. Southeastern Federal Power Program. Combined financial statements, September 30, 1996 and 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    The Southeastern Federal Power Program (SEFPP) consists of all activities associated with the production, transmission and disposition of Federal power marketed under Section 5 of the Flood Control Act of 1944 from projects in the ten southeastern states. The ten states are: Virginia, West Virginia, North Carolina, South Carolina, Georgia, Florida, Alabama, Mississippi, Tennessee, and Kentucky. Power is marketed to customers in 11 states - the above ten plus Illinois. SEFPP includes the accounts of two separate Federal government agencies- the Southeastern Power Administration (Southeastern) of the Department of Energy and the U.S. Army Corps of Engineers (Corps). Southeastern purchases, transmits, and markets power within four separate power systems (each including one or more Corps generating projects for which rates are set). Specific and joint-use costs allocated to power are included in the attached statements of assets. Federal investment and liabilities under utility plant and cash. The accounts of SEFPP are maintained in conformity with generally accepted accounting principles and the Uniform System of Accounts prescribed for electric utilities by the Federal Energy Regulatory Commission (FERC). SEFPP`s accounting policies also reflect requirements of specific legislation and executive directives issued by the applicable government agencies. Southeastern and Corps properties and income are exempt from taxation. Southeastern and the Corps receive Congressional appropriations through the Department of Energy (DOE) and the Department of Defense to finance their operations. The Corps also receives Congressional appropriations to finance construction of its hydroelectric projects.

  2. 78 FR 9936 - Federal Housing Administration (FHA): PowerSaver Home Energy Retrofit Loan Pilot Program...

    Science.gov (United States)

    2013-02-12

    ... Administration (FHA): PowerSaver Home Energy Retrofit Loan Pilot Program: Extension of Pilot Program AGENCY...: On March 31, 2011, HUD published a notice that announced HUD's FHA Home Energy Retrofit Loan Pilot Program (Retrofit Pilot Program) known as FHA PowerSaver, which is a pilot program conducted for loans...

  3. Federal Wind Energy Program. Program summary. [USA

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-01-01

    The objective of the Federal Wind Energy Program is to accelerate the development of reliable and economically viable wind energy systems and enable the earliest possible commercialization of wind power. To achieve this objective for small and large wind systems requires advancing the technology, developing a sound industrial technology base, and addressing the non-technological issues which could deter the use of wind energy. This summary report outlines the projects being supported by the program through FY 1977 toward the achievement of these goals. It also outlines the program's general organization and specific program elements.

  4. Federal Interim Storage program

    International Nuclear Information System (INIS)

    Johnson, E.R.; McBride, J.A.

    1984-01-01

    The DOE has developed a program for providing Federal Interim Storage servies for spent nuclear fuel which complies with the requirements of the Nuclear Waste Policy Act of 1982. Although very little constructive activity in providing storage facilities can be undertaken by DOE until fuel has been certified by NRC as eligible for FIS, DOE planning and background information is such as to provide reasonable assurance that its obligations can be fulfilled when the required certifications have been issued. A fee structure providing fuel recovery of all costs associated with the FIS program, as required by the Act, has been developed. It provides for an equitable distribution of costs among users, based on the quantity of fuel requiring storage

  5. Federal Student Loan Programs

    Science.gov (United States)

    Federal Student Aid, US Department of Education, 2014

    2014-01-01

    For those needing a loan to attend college, think federal aid first. Federal student loans usually offer borrowers lower interest rates and have more flexible repayment terms and options than private student loans. This brief report answers the following questions about federal aid: (1) What is a federal student loan?; (2) What is a private…

  6. The Federal Air Pollution Program.

    Science.gov (United States)

    National Air Pollution Control Administration (DHEW), Washington, DC.

    Described is the Federal air pollution program as it was in 1967. The booklet is divided into these major topics: History of the Federal Program; Research; Assistance to State and Local Governments; Abatement and Prevention of Air Pollution; Control of Motor Vehicle Pollution; Information and Education; and Conclusion. Federal legislation has…

  7. Federal Energy Management Program Overview

    Energy Technology Data Exchange (ETDEWEB)

    None

    2017-08-05

    Brochure offers an overview of the Federal Energy Management Program (FEMP), which provides agencies and organizations with the information, tools, and assistance they need to achieve their energy-related requirements and goals through specialized initiatives.

  8. 77 FR 66087 - Federal Perkins Loan Program, Federal Family Education Loan Program, and William D. Ford Federal...

    Science.gov (United States)

    2012-11-01

    ..., and 685 Federal Perkins Loan Program, Federal Family Education Loan Program, and William D. Ford... 685 RIN 1840-AD05 [Docket ID ED-2012-OPE-0010] Federal Perkins Loan Program, Federal Family Education... (Perkins Loan) program, Federal Family Education Loan (FFEL) program, and William D. Ford Federal Direct...

  9. Federal Innovation Program a Failure.

    Science.gov (United States)

    USA Today, 1979

    1979-01-01

    Professor Donald C. Orlich of Washington State University charges that, with few exceptions, the hundreds of research and development projects funded by the federal government since 1953 have brought no significant improvement in instruction. He is especially critical of the Experimental Schools Program. (Author/SJL)

  10. 78 FR 45617 - Student Assistance General Provisions, Federal Perkins Loan Program, Federal Family Education...

    Science.gov (United States)

    2013-07-29

    ..., et al. Student Assistance General Provisions, Federal Perkins Loan Program, Federal Family Education... General Provisions, Federal Perkins Loan Program, Federal Family Education Loan Program, and William D... General Provisions, Federal Perkins Loan (Perkins Loan) Program, Federal Family Education Loan (FFEL...

  11. Power program and nuclear power

    International Nuclear Information System (INIS)

    Chernilin, Yu.F.

    1990-01-01

    Main points of the USSR power program and the role of nuclear power in fuel and power complex of the country are considered. Data on dynamics of economic indices of electric power generation at nuclear power plants during 1980-1988 and forecasts till 2000 are presented. It is shown that real cost of 1 kW/h of electric power is equal to 1.3-1.8 cop., and total reduced cost is equal to 1.8-2.4 cop

  12. Federal Nuclear Energy Program: a synopsis

    International Nuclear Information System (INIS)

    1983-01-01

    This document provides an overview of the new nuclear policy objectives and initiatives and summarizes the Department of Energy programmatic strategy to realize the full nuclear potential. Analyses have been made within the context of prevailing and potential economic conditions, alternative energy options and prior nuclear performance and growth patterns. The Department's organizational structure, which was realigned in June 1982 to conform with the activities mandated by the Administration's policy, is also discussed. The individual program elements for nuclear research and development are described as they contribute to a fully integrated fuel cycle and power generation system. Federal and commercial responsibilities for developmental activity are delinated, and relationship of the programs to broad national energy objectives is specified

  13. Reagan's concept of federalism and nuclear power

    International Nuclear Information System (INIS)

    Axelrod, R.S.; Wilson, H.A.

    1991-01-01

    The 'New Federation' of the Reagan Administration was a doctrine to reduce regulations and devolve government functions to State and local governments. However, when these goals competed with other substantive goals, eg the promotion of nuclear power, the Administration chose to advance the latter. State and local governments utilized the NRC requirement for their participation in the planning and implementation of an evacuation plan to prevent the licensing of the Shoreham nuclear power plant. This strategy was contested by the national Administration which insisted on licensing the plant. The licensing of the Long Island Lighting Company's Shoreham nuclear power plant provides an opportunity to examine the role of nuclear power in highlighting the contradictions in Reagan's 'New Federation'. (author)

  14. Federal Energy Efficiency through Utility Partnerships: Federal Energy Management Program (FEMP) Program Overview Fact Sheet

    International Nuclear Information System (INIS)

    Beattie, D.; Wolfson, M.

    2001-01-01

    This Utility Program Overview describes how the Federal Energy Management Program (FEMP) utility program assists Federal energy managers. The document identifies both a utility financing mechanism and FEMP technical assistance available to support agencies' implementation of energy and water efficiency methods and renewable energy projects

  15. Environmental Enforcement of Federal Agencies: A Struggle for Power under the ’New Federalism

    Science.gov (United States)

    1990-01-01

    Separation of Powers Dillemma ............ . 55 III. Establishment of Goals...federal power. Currently that countervailing federal 54 power does not exist because of the restraints imposed on EPA. 16 d. Separation of Powers Dilemma...structure and implies a necessary separation of powers . In Federalist 48 Madison discussed the connections necessary to maintain a proper separation of powers :

  16. NASA and the Federal Management Intern Program.

    Science.gov (United States)

    Pound, Jack K.; Slack, Vivian M.

    A review of NASA Federal Management Intern (MI) programs indicates potential for identification, attraction, and early development of successful administrative management employees, but suggests that successful development of managers is a function of the long-term care with which an agency pursues MI programs. A recent study of separations in…

  17. 78 FR 65767 - Student Assistance General Provisions, Federal Perkins Loan Program, Federal Family Education...

    Science.gov (United States)

    2013-11-01

    ... Assistance General Provisions, Federal Perkins Loan Program, Federal Family Education Loan Program, and... Provisions, Federal Perkins Loan (Perkins Loan) Program, Federal Family Education Loan (FFEL) Program, and... Vol. 78 Friday, No. 212 November 1, 2013 Part II Department of Education 34 CFR Parts 668, 674...

  18. 78 FR 28953 - William D. Ford Federal Direct Loan Program

    Science.gov (United States)

    2013-05-16

    .... Ford Federal Direct Loan Program; Interim Final Rule #0;#0;Federal Register / Vol. 78, No. 95... [Docket ID ED-2013-OPE-0066] RIN 1840-AD13 William D. Ford Federal Direct Loan Program AGENCY: Office of... Secretary amends the William D. Ford Federal Direct Loan Program (Direct Loan Program) regulations to...

  19. Federal Aviation Administration retained savings program proposal

    International Nuclear Information System (INIS)

    Hostick, D.J.; Larson, L.L.; Hostick, C.J.

    1998-03-01

    Federal legislation allows federal agencies to retain up to 50% of the savings associated with implementing energy efficiency and water conservation measures and practices. Given budget pressures to reduce expenditures, the use of retained savings to fund additional projects represents a source of funds outside of the traditional budget cycle. The Southwest Region Federal Aviation Administration (FAA) has tasked Pacific Northwest National Laboratory (PNNL) to develop a model retained savings program for Southwest Region FAA use and as a prototype for consideration by the FAA. PNNL recommends the following steps be taken in developing a Southwest Region FAA retained savings program: Establish a retained savings mechanism. Determine the level at which the retained savings should be consolidated into a fund. The preliminary recommendation is to establish a revolving efficiency loan fund at the regional level. Such a mechanism allows some consolidation of savings to fund larger projects, while maintaining a sense of facility ownership in that the funds will remain within the region

  20. Indirect estimators in US federal programs

    CERN Document Server

    1996-01-01

    In 1991, a subcommittee of the Federal Committee on Statistical Methodology met to document the use of indirect estimators - that is, estimators which use data drawn from a domain or time different from the domain or time for which an estimate is required. This volume comprises the eight reports which describe the use of indirect estimators and they are based on case studies from a variety of federal programs. As a result, many researchers will find this book provides a valuable survey of how indirect estimators are used in practice and which addresses some of the pitfalls of these methods.

  1. KiloPower Program

    Energy Technology Data Exchange (ETDEWEB)

    McClure, Patrick Ray [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-08-04

    These are the slides for a phone interview with Aerospace America magazine of the AIAA. It goes over the KiloPower Program at Los Alamos National Laboratory (LANL), and covers the following: 1 kWe Kilopower, 10 kWe Kilopower, Kilopower Reactor Using Stirling Technology (KRUSTY) Integration Test (DAF), Reactor Configuration, and Platen Positions.

  2. 77 FR 76414 - William D. Ford Federal Direct Loan Program

    Science.gov (United States)

    2012-12-28

    ... Federal Direct Loan Program AGENCY: Department of Education. ACTION: Final regulations; correction... Loan (Perkins Loan) Program; the Federal Family Education Loan (FFEL) Program; and the William D. Ford Federal Direct Loan (Direct Loan) Program, including the Public Service Loan Forgiveness (PSLF) Program...

  3. Accelerating the commercialization on new technologies. [free market operation of federal alternate energy sources programs

    Science.gov (United States)

    Kuehn, T. J.; Nawrocki, P. M.

    1978-01-01

    It is suggested that federal programs for hastening the adoption of alternative energy sources must operate within the free market structure. Five phases of the free market commercialization process are described. Federal role possibilities include information dissemination and funding to stimulate private sector activities within these five phases, and federally sponsored procedures for accelerating commercialization of solar thermal small power systems are considered.

  4. 75 FR 38999 - Federal Perkins Loan Program: Federal Family Education Loan Program and William D. Ford Federal...

    Science.gov (United States)

    2010-07-07

    ..., or Direct Loan Program, excluding PLUS loans made under the FFEL and Direct Loan Programs to parents... that repaid a parent PLUS loan. Employee means an individual who, under Federal tax law, is considered... Internal Revenue Code. Involuntary separation due to misconduct means termination from [[Page 39001...

  5. Federal Geothermal Research Program Update Fiscal Year 2002

    Energy Technology Data Exchange (ETDEWEB)

    2003-09-01

    The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. To develop the technology needed to harness the Nation's vast geothermal resources, DOE's Office of Geothermal Technologies oversees a network of national laboratories, industrial contractors, universities, and their subcontractors. The goals are: (1) Double the number of States with geothermal electric power facilities to eight by 2006; (2) Reduce the levelized cost of generating geothermal power to 3-5 cents per kWh by 2007; and (3) Supply the electrical power or heat energy needs of 7 million homes and businesses in the United States by 2010. This Federal Geothermal Program Research Update reviews the specific objectives, status, and accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 2002. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy. balanced strategy for the Geothermal Program.

  6. Federal Geothermal Research Program Update Fiscal Year 2003

    Energy Technology Data Exchange (ETDEWEB)

    2004-03-01

    The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. To develop the technology needed to harness the Nation's vast geothermal resources, DOE's Office of Geothermal Technologies oversees a network of national laboratories, industrial contractors, universities, and their subcontractors. The following mission and goal statements guide the overall activities of the Office. The goals are: (1) Reduce the levelized cost of generating geothermal power to 3-5 cents per kWh by 2007; (2) Double the number of States with geothermal electric power facilities to eight by 2006; and (3) Supply the electrical power or heat energy needs of 7 million homes and businesses in the United States by 2010. This Federal Geothermal Program Research Update reviews the accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 2003. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy. balanced strategy for the Geothermal Program.

  7. ACHP | Federal Programs that Can Support Heritage Tourism

    Science.gov (United States)

    Search skip specific nav links Home arrow Heritage Tourism arrow Federal Programs that Can Support Heritage Tourism Federal Programs that Can Support Heritage Tourism The following is a sampling of federal programs that can help promote and support local or regional heritage tourism initiatives. Historic

  8. 29 CFR 99.525 - Criteria for Federal program risk.

    Science.gov (United States)

    2010-07-01

    ... Auditors § 99.525 Criteria for Federal program risk. (a) General. The auditor's determination should be... Federal program. The auditor shall use auditor judgment and consider criteria, such as described in... analysis, the auditor may wish to discuss a particular Federal program with auditee management and the...

  9. 7 CFR 3052.525 - Criteria for Federal program risk.

    Science.gov (United States)

    2010-01-01

    ... ORGANIZATIONS Auditors § 3052.525 Criteria for Federal program risk. (a) General. The auditor's determination... to the Federal program. The auditor shall use auditor judgment and consider criteria, such as... part of the risk analysis, the auditor may wish to discuss a particular Federal program with auditee...

  10. Federal Fisheries Permit (FFP)/ Federal Processor Permit (FPP) Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Federal Fisheries Permit (FFP) is required for vessels of the United States which are used to fish for groundfish in the Gulf of Alaska or Bering Sea and...

  11. The Korean nuclear power program

    International Nuclear Information System (INIS)

    Choi, Chang Tong

    1996-01-01

    Although the world nuclear power industry may appear to be in decline, continued nuclear power demand in Korea indicates future opportunities for growth and prosperity in this country. Korea has one of the world's most vigorous nuclear power programs. Korea has been an active promoter of nuclear power generation since 1978, when the country introduced nuclear power as a source of electricity. Korea now takes pride in the outstanding performance of its nuclear power plants, and has established a grand nuclear power scheme. This paper is aimed at introducing the nuclear power program of Korea, including technological development, international cooperation, and CANDU status in Korea. (author). 2 tabs

  12. 78 FR 63143 - VA Dental Insurance Program-Federalism

    Science.gov (United States)

    2013-10-23

    ...--Federalism AGENCY: Department of Veterans Affairs. ACTION: Proposed rule. SUMMARY: The Department of Veterans... that they are submitted in response to ``RIN 2900-AO86-VA Dental Insurance Program-- Federalism... Order 13132, Federalism Section 6(c) of Executive Order 13132 (entitled ``Federalism'') requires an...

  13. HUD PowerSaver Pilot Loan Program

    Energy Technology Data Exchange (ETDEWEB)

    Zimring, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Hoffman, Ian [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2010-12-10

    The U.S. Department of Housing and Urban Development (HUD) recently announced the creation of a pilot loan program for home energy improvements. The PowerSaver loan program is a new, energy-focused variant of the Title I Property Improvement Loan Insurance Program (Title I Program) and is planned for introduction in early 2011. The PowerSaver pilot will provide lender insurance for secured and unsecured loans up to $25,000 to single family homeowners. These loans will specifically target residential energy efficiency and renewable energy improvements. HUD estimates the two-year pilot will fund approximately 24,000 loans worth up to $300 million; the program is not capped. The Federal Housing Administration (FHA), HUD's mortgage insurance unit, will provide up to $25 million in grants as incentives to participating lenders. FHA is seeking lenders in communities with existing programs for promoting residential energy upgrades.

  14. How federalism shapes public health financing, policy, and program options.

    Science.gov (United States)

    Ogden, Lydia L

    2012-01-01

    In the United States, fiscal and functional federalism strongly shape public health policy and programs. Federalism has implications for public health practice: it molds financing and disbursement options, including funding formulas, which affect allocations and program goals, and shapes how funding decisions are operationalized in a political context. This article explores how American federalism, both fiscal and functional, structures public health funding, policy, and program options, investigating the effects of intergovernmental transfers on public health finance and programs.

  15. Green Roofs: Federal Energy Management Program (FEMP) Federal Technology Alert

    Energy Technology Data Exchange (ETDEWEB)

    Scholz-Barth, K.; Tanner, S.

    2004-09-01

    In a ''green roof,'' a layer of vegetation (e.g., a roof garden) covers the surface of a roof to provide shade, cooler indoor and outdoor temperatures, and effective storm-water management to reduce runoff. The main components are waterproofing, soil, and plants. There are two basic kinds: intensive and extensive. An intensive green roof often features large shrubs and trees, and it can be expensive to install and maintain. An extensive green roof features shallow soil and low-growing, horizontally spreading plants that can thrive in the alpine conditions of many rooftops. These plants do not require a lot of water or soil, and they can tolerate a significant amount of exposure to the sun and wind. This Federal Technology Alert focuses on the benefits, design, and implementation of extensive green roofs and includes criteria for their use on federal facilities.

  16. Federal Smart Cities and Communities Programs Resource Guide

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — The Federal Smart Cities and Communities Task Force created the " Federal Smart Cities and Communities Programs Resource Guide " to facilitate collaboration and...

  17. Georgia Power Company's college degree program

    International Nuclear Information System (INIS)

    Coggin, C.L.

    1988-01-01

    The purpose of this paper is to describe Georgia Power Company's on-site college degree program for nuclear power plant personnel. In February 1986, the US Nuclear Regulatory Commission issued a policy statement concerning engineering expertise on shift (Generic Letter 86-04), which appeared in Volume 50, Number 208 of the October 28, 1985 Federal Register. One of the options available to nuclear power plant personnel to meet the requirement was the combined senior reactor operator/shift technical adviser position. One of the methods for meeting the option included a bachelor's degree in engineering technology for an accredited institution, including course work in the physical, mathematical, or engineering sciences

  18. ADVANCED TURBINE SYSTEM FEDERAL ASSISTANCE PROGRAM

    Energy Technology Data Exchange (ETDEWEB)

    Frank Macri

    2003-10-01

    Rolls-Royce Corporation has completed a cooperative agreement under Department of Energy (DOE) contract DE-FC21-96MC33066 in support of the Advanced Turbine Systems (ATS) program to stimulate industrial power generation markets. This DOE contract was performed during the period of October 1995 to December 2002. This final technical report, which is a program deliverable, describes all associated results obtained during Phases 3A and 3B of the contract. Rolls-Royce Corporation (formerly Allison Engine Company) initially focused on the design and development of a 10-megawatt (MW) high-efficiency industrial gas turbine engine/package concept (termed the 701-K) to meet the specific goals of the ATS program, which included single digit NOx emissions, increased plant efficiency, fuel flexibility, and reduced cost of power (i.e., $/kW). While a detailed design effort and associated component development were successfully accomplished for the 701-K engine, capable of achieving the stated ATS program goals, in 1999 Rolls-Royce changed its focus to developing advanced component technologies for product insertion that would modernize the current fleet of 501-K and 601-K industrial gas turbines. This effort would also help to establish commercial venues for suppliers and designers and assist in involving future advanced technologies in the field of gas turbine engine development. This strategy change was partly driven by the market requirements that suggested a low demand for a 10-MW aeroderivative industrial gas turbine, a change in corporate strategy for aeroderivative gas turbine engine development initiatives, and a consensus that a better return on investment (ROI) could be achieved under the ATS contract by focusing on product improvements and technology insertion for the existing Rolls-Royce small engine industrial gas turbine fleet.

  19. 77 FR 66482 - Federal-State Unemployment Compensation Program: Certifications for 2012 Under the Federal...

    Science.gov (United States)

    2012-11-05

    ... DEPARTMENT OF LABOR Employment and Training Administration Federal-State Unemployment Compensation Program: Certifications for 2012 Under the Federal Unemployment Tax Act AGENCY: Employment and Training... Federal Unemployment Tax Act, 26 U.S.C. 3301 et seq., thereby enabling employers who make contributions to...

  20. 75 FR 68001 - Federal-State Unemployment Compensation Program: Certifications for 2010 under the Federal...

    Science.gov (United States)

    2010-11-04

    ... DEPARTMENT OF LABOR Employment and Training Administration Federal-State Unemployment Compensation Program: Certifications for 2010 under the Federal Unemployment Tax Act AGENCY: Employment and Training... Federal Unemployment Tax Act, 26 U.S.C. 3301 et seq., thereby enabling employers who make contributions to...

  1. 78 FR 67200 - Federal-State Unemployment Compensation Program: Certifications for 2013 Under the Federal...

    Science.gov (United States)

    2013-11-08

    ... DEPARTMENT OF LABOR Employment and Training Administration Federal-State Unemployment Compensation Program: Certifications for 2013 Under the Federal Unemployment Tax Act AGENCY: Employment and Training... Federal Unemployment Tax Act, 26 U.S.C. 3301 et seq., thereby enabling employers who make contributions to...

  2. 76 FR 68790 - Federal-State Unemployment Compensation Program: Certifications for 2011 Under the Federal...

    Science.gov (United States)

    2011-11-07

    ... DEPARTMENT OF LABOR Employment and Training Administration Federal-State Unemployment Compensation Program: Certifications for 2011 Under the Federal Unemployment Tax Act AGENCY: Employment and Training... Federal Unemployment Tax Act, 26 U.S.C. 3301 et seq., thereby enabling employers who make contributions to...

  3. 77 FR 42914 - Federal Employees Health Benefits Program and Federal Employees Dental and Vision Insurance...

    Science.gov (United States)

    2012-07-20

    ... Federal Flexible Benefits Plan: Pre-Tax Payment of Health Benefits Premiums AGENCY: Office of Personnel... this proposed rule; and (4) update the Federal Flexible Benefits Plan: Pre-Tax Payment of Health...--FEDERAL FLEXIBLE BENEFITS PLAN: PRE-TAX PAYMENTS OF HEALTH BENEFITS PREMIUMS PROGRAM 8. The authority...

  4. Financing Early Childhood Education Programs: State, Federal, and Local Issues

    Science.gov (United States)

    Hustedt, Jason T.; Barnett, W. Steven

    2011-01-01

    The landscape of financing early childhood education in the U.S. is complex. Programs run the gamut from tuition-supported private centers to public programs supported by federal, state, or local funds. Different funding streams are poorly coordinated. The federal government funds several major targeted programs that are available only to specific…

  5. Flate-plate photovoltaic power systems handbook for Federal agencies

    Science.gov (United States)

    Cochrane, E. H.; Lawson, A. C.; Savage, C. H.

    1984-01-01

    The primary purpose is to provide a tool for personnel in Federal agencies to evaluate the viability of potential photovoltaic applications. A second objective is to provide descriptions of various photovoltaic systems installed by different Federal agencies under the Federal Photovoltaic Utilization Program so that other agencies may consider similar applications. A third objective is to share lessons learned to enable more effective procurement, design, installation, and operation of future photovoltaic systems. The intent is not to provide a complete handbook, but rather to provide a guide for Federal agency personnel with additional information incorporated by references. The steps to be followed in selecting, procuring, and installing a photovoltaic application are given.

  6. 78 FR 62441 - VA Dental Insurance Program-Federalism

    Science.gov (United States)

    2013-10-22

    ...--Federalism AGENCY: Department of Veterans Affairs. ACTION: Direct final rule. SUMMARY: The Department of... that they are submitted in response to ``RIN 2900-AO85-VA Dental Insurance Program-- Federalism... add preemption language in accordance with the discussion above. Executive Order 13132, Federalism...

  7. 77 FR 72960 - William D. Ford Federal Direct Loan Program

    Science.gov (United States)

    2012-12-07

    ... Federal Direct Loan Program AGENCY: Office of Postsecondary Education, Department of Education. ACTION... document to establish the date for the early implementation of William D. Ford Federal Direct Loan (Direct Loan) program regulations that establish a new income-contingent repayment plan based on the President...

  8. Thai Nuclear Power Program

    International Nuclear Information System (INIS)

    Namwong, Ratanachai

    2011-01-01

    The Electricity Generating Authority of Thailand (EGAT), the main power producer in Thailand, was first interested in nuclear power as an electricity option in 1967 when the electricity demand increased considerably for the first time as a result of the economic and industrial growth. Its viability had been assessed several times during the early seventies in relation to the changing factors. Finally in the late 1970s, the proceeding with nuclear option was suspended for a variety of reasons, for instance, public opposition, economic repercussion and the uncovering of the indigenous petroleum resources. Nonetheless, EGAT continued to maintain a core of nuclear expertise. During 1980s, faced with dwindling indigenous fossil fuel resources and restrictions on the use of further hydro as an energy source, EGAT had essentially reconsidered introducing nuclear power plants to provide a significant fraction to the long term future electricity demand. The studies on feasibility, siting and environmental impacts were conducted. However, the project was never implemented due to economics crisis in 1999 and strong opposition by environmentalists and activists groups. The 1986 Chernobyl disaster was an important cause. After a long dormant period, the nuclear power is now reviewed as one part of the solution for future energy supply in the country. Thailand currently relies on natural gas for 70 percent of its electricity, with the rest coming from oil, coal and hydro-power. One-third of the natural gas consumed in Thailand is imported, mainly from neighbouring Myanmar. According to Power Development Plan (PDP) 2007 rev.2, the total installed electricity capacity will increase from 28,530.3 MW in 2007 to 44,281 MW by the end of plan in 2021. Significantly increasing energy demand, concerns over climate change and dependence on overseas supplies of fossil fuels, all turn out in a favor of nuclear power. Under the current PDP (as revised in 2009), two 1,000- megawatt nuclear

  9. Virginia Power's capacity acquisition program

    International Nuclear Information System (INIS)

    Carney, R.W.

    1991-01-01

    Virginia Power is a utility with a growing demand for electricity. To meet that growth it has embarked on an aggressive program to encourage the construction of privately-owned generating plants. In 1988 it conducted the largest competitive acquisition program by any utility to date. Virginia Power has retained the option to build plants if the bids it receives are too costly or do not meet the needs of its customers. This paper describes the situation at Virginia Power, the program it has implemented, and the capacity additions which are scheduled between 1989 and 1995

  10. 76 FR 30147 - Application of the Energy Planning and Management Program Power Marketing Initiative to the...

    Science.gov (United States)

    2011-05-24

    ... Management Program Power Marketing Initiative to the Boulder Canyon Project AGENCY: Western Area Power.... SUMMARY: The Western Area Power Administration (Western), a Federal power marketing agency of the..., the Energy Management and Planning Program (Program), and the Conformed General Consolidated Power...

  11. 76 FR 23583 - Application of the Energy Planning and Management Program Power Marketing Initiative to the...

    Science.gov (United States)

    2011-04-27

    ... Management Program Power Marketing Initiative to the Boulder Canyon Project AGENCY: Western Area Power... Area Power Administration (Western), a Federal power marketing agency of the Department of Energy (DOE), will apply the Energy Planning and Management Program (Program) Power Marketing Initiative (PMI), as...

  12. 77 FR 12930 - Federal Acquisition Regulation: Socioeconomic Program Parity

    Science.gov (United States)

    2012-03-02

    ... (SDVOSB) Program, or the Women-Owned Small Business (WOSB) Program. DATES: Effective Date: April 2, 2012...) Program (see subpart 19.14); or (iv) Women-Owned Small Business (WOSB) Program (see subpart 19.15). (3... amending the Federal Acquisition Regulation (FAR) to implement a section of the Small Business Jobs Act of...

  13. Federal Geothermal Research Program Update - Fiscal Year 2001

    Energy Technology Data Exchange (ETDEWEB)

    Laney, P.T.

    2002-08-31

    This Federal Geothermal Program Research Update reviews the specific objectives, status, and accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 2001. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy.

  14. Federal supervisory powers in administrative action on behalf of the Federal Government. Bundesaufsicht in der Bundesauftragsverwaltung

    Energy Technology Data Exchange (ETDEWEB)

    Tschentscher, T

    1992-01-01

    The Federal Government's authority to give instructions in matters of public administration pursuant to Art. 85 III GG has been gaining in significance over the last few years in the course of federal disputes about the licenses issued to the NUKEM company under atomic energy law, or about the licensing of the Kalkar fast breeder reactor. Proceeding from the above federal controversy about issues relating to atomic energy law, the author extends his study to the general constitutional level, investigating the provisions of the German constitution relating to the supervisory power and the authority to give instructions on the part of the Federal Government, and the rights and means of the Laender governments to defend their administrative rights. (orig.).

  15. 78 FR 64873 - Federal Employees Health Benefits Program and Federal Employees Dental and Vision Insurance...

    Science.gov (United States)

    2013-10-30

    ... family members under the FEHB and the Federal Employees Dental and Vision Insurance Program (FEDVIP... procedure, Government employees, Health facilities, Health insurance, Health professions, Hostages, Iraq... Administrative practice and procedure, Government employees, Health insurance, Taxes, Wages. 5 CFR Part 894...

  16. 78 FR 39613 - Federal Pell Grant Program

    Science.gov (United States)

    2013-07-02

    .... Individuals with disabilities can obtain this document in an accessible format (e.g., braille, large print... accordance with the Administrative Procedure Act (APA) (5 U.S.C. 553). However, the APA provides that an... APA because the statutory change to prohibit a student from receiving two Federal Pell Grants in a...

  17. US nuclear power programs

    International Nuclear Information System (INIS)

    McGolf, D.J.

    1994-01-01

    In the United States, coal provided 56 percent of the electricity generated in 1992. Nuclear energy was the next largest contributor, supplying 22 percent. Natural gas provided 9 percent, while hydro-electric and renewables together supplied another 9 percent. Currently, the 109 nuclear power plants in the U.S. have an overall generating capacity of 99,000 MWe. To improve efficiency, safety, and performance, the lessons of 30 years of experience with nuclear powerplants are being incorporated into design criteria for the next generation of U.S. plants. The new Advanced Light Water Reactor plants will feature simpler designs, which will enable more cost-effective construction and maintenance. To enhance safety, design margins are being increased, and human factors are being considered and incorporated into the designs

  18. US nuclear power programs

    Energy Technology Data Exchange (ETDEWEB)

    McGolf, D J

    1994-12-31

    In the United States, coal provided 56 percent of the electricity generated in 1992. Nuclear energy was the next largest contributor, supplying 22 percent. Natural gas provided 9 percent, while hydro-electric and renewables together supplied another 9 percent. Currently, the 109 nuclear power plants in the U.S. have an overall generating capacity of 99,000 MWe. To improve efficiency, safety, and performance, the lessons of 30 years of experience with nuclear powerplants are being incorporated into design criteria for the next generation of U.S. plants. The new Advanced Light Water Reactor plants will feature simpler designs, which will enable more cost-effective construction and maintenance. To enhance safety, design margins are being increased, and human factors are being considered and incorporated into the designs.

  19. 76 FR 14566 - Federal Acquisition Regulation; Socioeconomic Program Parity

    Science.gov (United States)

    2011-03-16

    ... businesses and their relationship to the other small business programs. FAR Case 2010- 015, Women-Owned Small... Women- owned Small Business (WOSB) Federal Contract Program final rule, (75 FR 62258, October 7, 2010...-disabled veteran-owned small business concerns participation. * * * * * PART 19--SMALL BUSINESS PROGRAMS 19...

  20. Utility Green Tariff Programs: Considerations for Federal Agencies

    Energy Technology Data Exchange (ETDEWEB)

    Heeter, Jenny

    2017-05-08

    This FEMP First Thursday presentation will explain the concept of a utility green tariff, how it differs from a green pricing program, and what questions federal agencies should have about participating.

  1. Federal Employees Health Benefits Program (FEHBP) Plan Information

    Data.gov (United States)

    Office of Personnel Management — A list of all Federal Employees Health Benefits Program (FEHBP) plans available in each state, as well as links to the plan brochures, changes for each plan from the...

  2. Nurse-midwives in federally funded health centers: understanding federal program requirements and benefits.

    Science.gov (United States)

    Carter, Martha

    2012-01-01

    Midwives are working in federally funded health centers in increasing numbers. Health centers provide primary and preventive health care to almost 20 million people and are located in every US state and territory. While health centers serve the entire community, they also serve as a safety net for low-income and uninsured individuals. In 2010, 93% of health center patients had incomes below 200% of the Federal Poverty Guidelines, and 38% were uninsured. Health centers, including community health centers, migrant health centers, health care for the homeless programs, and public housing primary care programs, receive grant funding and enjoy other benefits due to status as federal grantees and designation as federally qualified health centers. Clinicians working in health centers are also eligible for financial and professional benefits because of their willingness to serve vulnerable populations and work in underserved areas. Midwives, midwifery students, and faculty working in, or interacting with, health centers need to be aware of the regulations that health centers must comply with in order to qualify for and maintain federal funding. This article provides an overview of health center regulations and policies affecting midwives, including health center program requirements, scope of project policy, provider credentialing and privileging, Federal Tort Claims Act malpractice coverage, the 340B Drug Pricing Program, and National Health Service Corps scholarship and loan repayment programs. © 2012 by the American College of Nurse-Midwives.

  3. Federal tax incentives affecting coal and nuclear power economics

    International Nuclear Information System (INIS)

    Chapman, D.

    1982-01-01

    This paper analyzes the effect of federal corporate income tax incentives on coal and nuclear power developments. It estimates (1) the magnitudes of tax incentives in relationship to utility costs, (2) the relative magnitude of benefits going to coal and nuclear facilities, and (3) the influence which the time paths of tax payments and after-tax net income have upon possible incentives for premature construction and excess capacity. Utility planners currently believe that nuclear power enjoys an after-tax competitive advantage over coal plants. Investigation of investment-related credits, deductions, and exclusions in the Internal Revenue Code shows that nuclear power enjoys a more favorable tax subsidy because of its greater capital intensity. In the absence of tax subsidies, no utility would prefer nuclear power to coal generation. Tax changes now under consideration could increase the tax benefits to both without disturbing the differential advantage held by nuclear power. 43 references, 2 figures, 4 tables

  4. Federal government information handbook formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the Federal Government. It contains: a summary of the organization and responsibilities of agencies within the executive branch of the Federal government which may be relevant to FUSRAP activities; a brief summary of relevant Federal statutes and regulations; a description of the structure of the US Congress, identification of the officers, relevant committees and committee chairmen; a description of the Federal legislative process; a summary of legislation enacted and considered in the recently-adjourned 96th Congress; a description of the Federal budgetary process; a summary of the Carter Administration's comprehensive radioactive waste management program; and excerpts from the text of relevant Federal statutes and regulations

  5. Federal government information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the Federal Government. It contains a summary of the organization and responsibilities of agencies within the executive branch of the Federal government which may be relevant to FUSRAP activities; a brief summary of relevant Federal statutes and regulations; a description of the structure of the US Congress, identification of the officers, relevant committees and committee chairmen; a description of the Federal legislative process; a summary of legislation enacted and considered in the recently-adjourned 96th Congress; a description of the Federal budgetary process; a summary of the Carter Administration's comprehensive radioactive waste management program; and excerpts from the text of relevant federal statutes and regulations

  6. Federal government information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the Federal Government. It contains a summary of the organization and responsibilities of agencies within the executive branch of the Federal government which may be relevant to FUSRAP activities; a brief summary of relevant Federal statutes and regulations; a description of the structure of the US Congress, identification of the officers, relevant committees and committee chairmen; a description of the Federal legislative process; a summary of legislation enacted and considered in the recently-adjourned 96th Congress; a description of the Federal budgetary process; a summary of the Carter Administration's comprehensive radioactive waste management program; and excerpts from the text of relevant federal statutes and regulations.

  7. Parallel processor programs in the Federal Government

    Science.gov (United States)

    Schneck, P. B.; Austin, D.; Squires, S. L.; Lehmann, J.; Mizell, D.; Wallgren, K.

    1985-01-01

    In 1982, a report dealing with the nation's research needs in high-speed computing called for increased access to supercomputing resources for the research community, research in computational mathematics, and increased research in the technology base needed for the next generation of supercomputers. Since that time a number of programs addressing future generations of computers, particularly parallel processors, have been started by U.S. government agencies. The present paper provides a description of the largest government programs in parallel processing. Established in fiscal year 1985 by the Institute for Defense Analyses for the National Security Agency, the Supercomputing Research Center will pursue research to advance the state of the art in supercomputing. Attention is also given to the DOE applied mathematical sciences research program, the NYU Ultracomputer project, the DARPA multiprocessor system architectures program, NSF research on multiprocessor systems, ONR activities in parallel computing, and NASA parallel processor projects.

  8. Preference and Priority in Federal Funding: Aligning Federal Resources to Maximize Program Investment Efficiency and Impacts in Communities

    Science.gov (United States)

    This page contains the document, Preference and Priority in Federal Funding: Aligning Federal Resources to Maximize Program Investment Efficiency and Impacts in Communities - Lessons from EPA’s Brownfields Program.

  9. The local power supply in the German Federal Republic

    International Nuclear Information System (INIS)

    Tettinger, P.J.

    1992-01-01

    The article first examines the contours of the foundations of the communes' competence to act autonomously, which have been laid by constitutional jurisdiction and jurisprudence. Next, the limits that constitutional law sets to the communes' competence in the field of energy politics are scrutinized. These limits firstly result from the confinement of the communal administrative unions' competence to a local sphere, and secondly from the additional constraints of Federal law, particularly the Law Concerning the Power Economy, and of the law of the Laender, here primarily communal commercial law. It is concluded that the limits to the communal administrative unions' competence must be strictly observed and the constraints imposed by power law and communal commercial law respected. Under the present constitutional law the guarantee of communal autonomy at least provides no legal means of defying decisions and directives under the laws of the Federation or the Laender that apply supraregionally. (orig./HSCH) [de

  10. Energy Industry Powers CTE Program

    Science.gov (United States)

    Khokhar, Amy

    2012-01-01

    Michael Fields is a recent graduate of Buckeye Union High School in Buckeye, Arizona. Fields is enrolled in the Estrella Mountain Community College (EMCC) Get Into Energy program, which means he is well on his way to a promising career. Specializing in power plant technology, in two years he will earn a certificate that will all but guarantee a…

  11. Redesigning Federal Grant Programs. Occasional Paper #24.

    Science.gov (United States)

    McLoone, Eugene P.

    When taxation is based on ability to pay and programs are targeted at a minimum service level, every state with any population that requires the service must participate. States and localities receive grants only because groups and individuals are to be treated equally. The role of the recipient government is the provision of the minimum…

  12. 2008 Federal Energy Management Program (FEMP) Market Report

    Energy Technology Data Exchange (ETDEWEB)

    Tremper, C.

    2009-07-01

    This report assesses the market for Federal Energy Management Program (FEMP) services as it existed in FY 2008. It discusses Federal energy management goal progress in FY 2008, and examines the environment in which agencies implemented energy management projects over the last three years. The report also discusses some recent events that will increase the market for FEMP services, and outlines FEMP's major strategies to address these changes in FY 2009 and beyond.

  13. Federal Geothermal Research Program Update, FY 2000

    Energy Technology Data Exchange (ETDEWEB)

    Renner, Joel Lawrence

    2001-08-01

    The Department of Energy's Geothermal Program serves two broad purposes: 1) to assist industry in overcoming near-term barriers by conducting cost-shared research and field verification that allows geothermal energy to compete in today's aggressive energy markets; and 2) to undertake fundamental research with potentially large economic payoffs. The four categories of work used to distinguish the research activities of the Geothermal Program during FY 2000 reflect the main components of real-world geothermal projects. These categories form the main sections of the project descriptions in this Research Update. Exploration Technology research focuses on developing instruments and techniques to discover hidden hydrothermal systems and to explore the deep portions of known systems. Research in geophysical and geochemical methods is expected to yield increased knowledge of hidden geothermal systems. Reservoir Technology research combines laboratory and analytical investigations with equipment development and field testing to establish practical tools for resource development and management for both hydrothermal reservoirs and enhanced geothermal systems. Research in various reservoir analysis techniques is generating a wide range of information that facilitates development of improved reservoir management tools. Drilling Technology focuses on developing improved, economic drilling and completion technology for geothermal wells. Ongoing research to avert lost circulation episodes in geothermal drilling is yielding positive results. Conversion Technology research focuses on reducing costs and improving binary conversion cycle efficiency, to permit greater use of the more abundant moderate-temperature geothermal resource, and on the development of materials that will improve the operating characteristics of many types of geothermal energy equipment. Increased output and improved performance of binary cycles will result from investigations in heat cycle research.

  14. Estimating the Effects of Climate Change on Federal Hydropower and Power Marketing

    Energy Technology Data Exchange (ETDEWEB)

    Sale, Michael J [ORNL; Kao, Shih-Chieh [ORNL; Uria Martinez, Rocio [ORNL; Wei, Yaxing [ORNL

    2011-01-01

    The U.S. Department of Energy is currently preparing an assessment of the effects of climate change on federal hydropower, as directed by Congress in Section 9505 of the Secure Water Act of 2009 (P.L. 111-11). This paper describes the assessment approach being used in a Report to Congress currently being prepared by Oak Ridge National Laboratory. The 9505 assessment will examine climate change effects on water available for hydropower operations and the future power supplies marketed from federal hydropower projects. It will also include recommendations from the Power Marketing Administrations (PMAs) on potential changes in operation or contracting practices that could address these effects and risks of climate change. Potential adaption and mitigation strategies will also be identified. Federal hydropower comprises approximately half of the U.S. hydropower portfolio. The results from the 9505 assessment will promote better understanding among federal dam owners/operators of the sensitivity of their facilities to water availability, and it will provide a basis for planning future actions that will enable adaptation to climate variability and change. The end-users of information are Congressional members, their staff, the PMAs and their customers, federal dam owners/operators, and the DOE Water Power Program.

  15. Virginia Power's regulatory reduction program

    International Nuclear Information System (INIS)

    Miller, G.D.

    1996-01-01

    Virginia Power has two nuclear plants, North Anna and Surry Power Stations, which have two units each for a total of four nuclear units. In 1992, the Nuclear Regulatory Commission solicited comments from the nuclear industry to obtain their ideas for reducing the regulatory burden on nuclear facilities. Pursuant to the new regulatory climate, Virginia Power developed an internal program to evaluate and assess the regulatory and self-imposed requirements to which they were committed, and to pursue regulatory relief or internal changes where possible and appropriate. The criteria were that public safety must be maintained, and savings must be significant. Up to the date of the conference, over US$22 million of one-time saving had been effected, and US$2.75 million in annual savings

  16. William D. Ford Federal Direct Loan Program. Final Regulations. Federal Register, Department of Education, 34 CFR Part 685

    Science.gov (United States)

    National Archives and Records Administration, 2014

    2014-01-01

    The purpose of this regulatory action is to amend the regulations governing the William D. Ford Federal Direct Loan (Direct Loan) Program (§ 685.200 of title 34 of the Code of Federal Regulations (CFR)). These regulations strengthen and improve administration of the Federal Direct PLUS Loan Program authorized under title IV of the Higher Education…

  17. Independent Evaluators of Federal Programs: Approaches, Devices, and Examples

    Science.gov (United States)

    2010-08-16

    rehabilitation of the disorder; the status of studies and clinical trials involving innovative treatments; a description of each treatment program and a...Transit Administration ( FTA ), a part of the Department of Transportation (DOT), oversees the safety and security of rail transit agencies which...an oversight body for each jurisdiction. The program is designed, according to a GAO summary, “as one in which FTA , other federal agencies, states

  18. Gender Differences in Major Federal External Grant Programs. Technical Report

    Science.gov (United States)

    Hosek, Susan D.; Cox, Amy G.; Ghosh-Dastidar, Bonnie; Kofner, Aaron; Ramphal, Nishal; Scott, Jon; Berry, Sandra H.

    2005-01-01

    The Wyden amendment to the National Science Foundation (NSF) Authorization Act of 2002 sought to determine whether federally funded educational programs other than sports comply with Title IX, which prohibits gender discrimination. At the request of NSF, this report analyzes administrative data from fiscal years 2001 through 2003 describing the…

  19. 30 CFR 903.700 - Arizona Federal program.

    Science.gov (United States)

    2010-07-01

    ... Resources has jurisdiction over the mining of minerals, and oil and gas under Title 27 of the Arizona....700 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE ARIZONA § 903.700 Arizona Federal...

  20. Soviet Union's Nuclear Power Program

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    Glasnost has dramatically increased the availability of information about the Soviet Union's nuclear industry. In the future, even more information is likely to become known as Soviet participation in international forums increases. Not only is much more general information now available, but up-to-date details are regularly provided, including information such as the Soviet nuclear industry's strategic direction and goals, recent reactor design changes, safety inspection results, and reports of public opposition and protest. This article summarizes the current status of the Soviet nuclear power program, reconciling the often conflicting reports from various public sources

  1. 75 FR 22809 - Mandatory Guidelines for Federal Workplace Drug Testing Programs

    Science.gov (United States)

    2010-04-30

    ... time for related training in Federal and federally-regulated workplace drug testing programs and will... related training in Federal and federally-regulated workplace drug testing programs, including HHS... DEPARTMENT OF HEALTH AND HUMAN SERVICES Mandatory Guidelines for Federal Workplace Drug Testing...

  2. Federal Geothermal Research Program Update Fiscal Year 1999

    Energy Technology Data Exchange (ETDEWEB)

    2004-02-01

    The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. To develop the technology needed to harness the Nation's vast geothermal resources, DOE's Office of Geothermal and Wind Technologies oversees a network of national laboratories, industrial contractors, universities, and their subcontractors. The following mission and goal statements guide the overall activities of the Office of Geothermal and Wind Technologies. This Federal Geothermal Program Research Update reviews the specific objectives, status, and accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 1999. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal and Wind Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy.

  3. Federal Employees Health Benefits Program and Federal Employees Dental and Vision Insurance Program: eligibility for Pathway Programs participants. Interim final rule with request for comments.

    Science.gov (United States)

    2014-01-06

    The U.S. Office of Personnel Management (OPM) is issuing an interim final regulation to update the Federal Employees Health Benefits Program (FEHBP) and the Federal Employees Dental and Vision Insurance Program (FEDVIP) regulations to reflect updated election opportunities for participants in the Pathways Programs. The Pathways Programs were created by Executive Order (E.O.) 13562, signed by the President on December 27, 2010, and are designed to enable the Federal Government to compete effectively for students and recent graduates by improving its recruitment efforts through internships and similar programs with Federal agencies. This interim final rule furthers these recruitment and retention efforts by providing health insurance, as well as dental and vision benefits, to eligible program participants and their families.

  4. ENergy and Power Evaluation Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    In the late 1970s, national and international attention began to focus on energy issues. Efforts were initiated to design and test analytical tools that could be used to assist energy planners in evaluating energy systems, particularly in developing countries. In 1984, the United States Department of Energy (DOE) commissioned Argonne National Laboratory`s Decision and Information Sciences Division (DIS) to incorporate a set of analytical tools into a personal computer-based package for distribution in developing countries. The package developed by DIS staff, the ENergy and Power Evaluation Program (ENPEP), covers the range of issues that energy planners must face: economic development, energy demand projections, supply-and-demand balancing, energy system expansion, and environmental impact analysis. Following the original DOE-supported development effort, the International Atomic Energy Agency (IAEA), with the assistance from the US Department of State (DOS) and the US Department of Energy (DOE), provided ENPEP training, distribution, and technical support to many countries. ENPEP is now in use in over 60 countries and is an international standard for energy planning tools. More than 500 energy experts have been trained in the use of the entire ENPEP package or some of its modules during the international training courses organized by the IAEA in collaboration with Argonne`s Decision and Information Sciences (DIS) Division and the Division of Educational Programs (DEP). This report contains the ENPEP program which can be download from the internet. Described in this report is the description of ENPEP Program, news, forums, online support and contacts.

  5. 76 FR 81487 - Application of the Energy Planning and Management Program Power Marketing Initiative to the...

    Science.gov (United States)

    2011-12-28

    ... Management Program Power Marketing Initiative to the Boulder Canyon Project Post-2017 Remarketing AGENCY... . Information regarding Western's BCP Post-2017 marketing efforts, the Energy Management and Planning Program... Proposals. SUMMARY: The Western Area Power Administration (Western), a Federal power marketing agency of the...

  6. The development of the breeder reactor program of the German Federal Republic

    International Nuclear Information System (INIS)

    Haunschild, H.H.

    1984-01-01

    This article recapitulates the stages of the program which is in hand in the German Federal Republic concerning breeder reactors with fast neutrons. In particular, it describes in detail the causes for the delays in the construction of the demonstration reactor SRN 300 (Kalkar) for which the commissioning has now been fixed for 1987. It emphasizes the importance of the collaboration which exists in Europe for the establishment of the projects and the construction of fast neutron power stations, including the SNR 2 reactor; the construction of the latter could begin in the German Federal Republic at the end of the Eighties [fr

  7. 75 FR 70013 - Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal...

    Science.gov (United States)

    2010-11-16

    ... 0938-AP89 Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal... the July 22, 2010 Federal Register entitled, ``Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal Year 2011.'' DATES: Effective Date. This correction is effective for IRF...

  8. QA programs in nuclear power plants

    International Nuclear Information System (INIS)

    Ellingson, A.C.

    1976-01-01

    As an overview of quality assurance programs in nuclear power plants, the energy picture as it appears today is reviewed. Nuclear power plants and their operations are described and an attempt is made to place in proper perspective the alleged ''threats'' inherent in nuclear power. Finally, the quality assurance programs being used in the nuclear industry are described

  9. The affordable care ACT on loyalty programs for federal beneficiaries.

    Science.gov (United States)

    Piacentino, Justin J; Williams, Karl G

    2014-02-01

    To discuss changes in the law that allow community pharmacy loyalty programs to include and offer incentives to Medicare and Medicaid beneficiaries. The retailer rewards exception of the Patient Protection and Affordable Care Act of 2010 and its change to the definition of remuneration in the civil monetary penalties of the Anti-Kickback Statute now allow incentives to be earned on federal benefit tied prescription out-of-pocket costs. The criteria required to design a compliant loyalty program are discussed. Community pharmacies can now include Medicare and Medicaid beneficiaries in compliant customer loyalty programs, where allowed by state law. There is a need for research directly on the influence of loyalty programs and nominal incentives on adherence.

  10. 75 FR 19966 - Boulder Canyon Project-Post-2017 Application of the Energy Planning and Management Program Power...

    Science.gov (United States)

    2010-04-16

    ... Application of the Energy Planning and Management Program Power Marketing Initiative AGENCY: Western Area... and Management Program (Program) Power Marketing Initiative (PMI) (10 CFR part 905) to the Boulder... Power Administration (Western), Desert Southwest Region, a Federal power marketing agency of the...

  11. 34 CFR 682.100 - The Federal Family Education Loan programs.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false The Federal Family Education Loan programs. 682.100... POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION FEDERAL FAMILY EDUCATION LOAN (FFEL) PROGRAM Purpose and Scope § 682.100 The Federal Family Education Loan programs. (a) This part governs the following four programs...

  12. The electronuclear program of the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Mandel, Heinrich

    1978-01-01

    The preoccupation of the Federal Republic is to lessen its energy dependency on petroleum (now 52%) particularly by developing nuclear power which could in the year 2,000 meet 27% of its primary energy needs, equally with oil. At the end of 1977, West Germany had 6 industrial reactors operating representing a total power of 5,500 MW., 12 reactors under construction (of which 8 units of 1,300 MW.) for a total power of 13,000 MW., 9 reactors under investigation (11,300 MW.), and 2 reactors 2,700 M. whose construction had been postponed for political reasons. A centre for fuel reprocessing and waste storage is also being investigated [fr

  13. 18 CFR 2.22 - Pricing policy for transmission services provided under the Federal Power Act.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Pricing policy for... INTERPRETATIONS Statements of General Policy and Interpretations Under the Federal Power Act § 2.22 Pricing policy... Policy Statement on its pricing policy for transmission services provided under the Federal Power Act...

  14. 77 FR 42085 - Federal Perkins Loan Program, Federal Family Education Loan Program, and William D. Ford Federal...

    Science.gov (United States)

    2012-07-17

    ... borrower's loans if the borrower receives a disbursement of a new title IV loan or receives a new TEACH... proposed regulations for programs authorized by title IV of the HEA, to obtain public involvement in the...-defaulted Direct Loan, except for a parent Direct PLUS loan or a Direct Consolidation loan that repaid a...

  15. Space Solar Power Program. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Arif, Humayun; Barbosa, Hugo; Bardet, Christophe; Baroud, Michel; Behar, Alberto; Berrier, Keith; Berthe, Phillipe; Bertrand, Reinhold; Bibyk, Irene; Bisson, Joel; Bloch, Lawrence; Bobadilla, Gabriel; Bourque, Denis; Bush, Lawrence; Carandang, Romeo; Chiku, Takemi; Crosby, Norma; De Seixas, Manuel; De Vries, Joha; Doll, Susan; Dufour, Francois; Eckart, Peter; Fahey, Michael; Fenot, Frederic; Foeckersperger, Stefan; Fontaine, Jean-Emmanuel; Fowler, Robert; Frey, Harald; Fujio, Hironobu; Gasa, Jaume Munich; Gleave, Janet; Godoe, Jostein; Green, Iain; Haeberli, Roman; Hanada, Toshiya; Harris, Peter; Hucteau, Mario; Jacobs, Didier Fernand; Johnson, Richard; Kanno, Yoshitsugu; Koenig, Eva Maria; Kojima, Kazuo; Kondepudi, Phani; Kottbauer, Christian; Kulper, Doede; Kulagin, Konstantin; Kumara, Pekka; Kurz, Rainer; Laaksonen, Jyrki; Lang, Andrew Neill; Lathan, Corinna; Le Fur, Thierry; Lewis, David; Louis, Alain; Mori, Takeshi; Morlanes, Juan; Murbach, Marcus; Nagatomo, Hideo; O' brien, Ivan; Paines, Justin; Palaszewski, Bryan; Palmnaes, Ulf; Paraschivolu, Marius; Pathare, Asmin; Perov, Egor; Persson, Jan; Pessoa-Lopes, Isabel; Pinto, Michel; Porro, Irene; Reichert, Michael; Ritt-Fischer, Monika; Roberts, Margaret; Robertson II, Lawrence; Rogers, Keith; Sasaki, Tetsuo; Scire, Francesca; Shibatou, Katsuya; Shirai, Tatsuya; Shiraishi, Atsushi; Soucaille, Jean-Francois; Spivack, Nova; St. Pierre, Dany; Suleman, Afzal; Sullivan, Thomas; Theelen, Bas Johan; Thonstad, Hallvard; Tsuji, Masatoshi; Uchiumi, Masaharu; Vidqvist, Jouni; Warrell, David; Watanabe, Takafumi; Willis, Richard; Wolf, Frank; Yamakawa, Hiroshi; Zhao, Hong

    1992-08-01

    Information pertaining to the Space Solar Power Program is presented on energy analysis; markets; overall development plan; organizational plan; environmental and safety issues; power systems; space transportation; space manufacturing, construction, operations; design examples; and finance.

  16. Power programmes review: Power reactors in the Federal Republic of Germany

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1960-04-15

    Compared with work in some other industrialized countries, the atomic energy programme in the Federal Republic of Germany got off to a somewhat late start. Nevertheless, after about four years of research and training of scientists, the country is today on the threshold of a major phase in atomic energy development. While research and training are being continued, the first concrete steps are also being initiated for the commercial utilization of nuclear energy as a source of power. Several experimental nuclear power stations are being set up, designed or planned

  17. 49 CFR Appendix A to Part 604 - Listing of Human Service Federal Financial Assistance Programs

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Listing of Human Service Federal Financial... (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CHARTER SERVICE Pt. 604, App. A Appendix A to Part 604—Listing of Human Service Federal Financial Assistance Programs Federal Programs...

  18. Federal supervisory authorities' power to issue directives in nuclear licensing procedures (Kalkar reactor)

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    The Federal Constitutional Court (BVerfG) is concerned in its judgement with the legal instrument of Federal supervisory authorities' power to issue directives in nuclear licensing procedures (Kalkar reactor). Dealt with are questions concerning material and excercising competences, the Federal Government's right to issue directives and possible violation of Laender rights, as well as the legal position between Land and Federal Government, the necessity to issue clear directives, questions concerning the competence to issue directives and the Federal Government's duty to consider the overall interests (Federal Government and Laender interests), questions concerning constitutional state principles and the limits in the relations between Federal Government - Laender concerning legal competence. (RST) [de

  19. Green Power Partnership Related Programs & Organizations

    Science.gov (United States)

    The U.S. EPA's Green Power Partnership is a voluntary program designed to reduce the environmental impact of electricity generation by promoting renewable energy. This page provides a brief program overview, including vision and accomplishments.

  20. 75 FR 76633 - Oregon; Correction of Federal Authorization of the State's Hazardous Waste Management Program

    Science.gov (United States)

    2010-12-09

    ...; Correction of Federal Authorization of the State's Hazardous Waste Management Program AGENCY: Environmental... its federally authorized RCRA Hazardous Waste Management Program. These authorized changes included... with Conditionally Exempt Small Quality Generators (CESQG) waste is subject to RCRA used oil management...

  1. 75 FR 76691 - Oregon; Correction of Federal Authorization of the State's Hazardous Waste Management Program

    Science.gov (United States)

    2010-12-09

    ...; Correction of Federal Authorization of the State's Hazardous Waste Management Program AGENCY: Environmental... to the State of Oregon's federally authorized RCRA hazardous waste management program. On January 7... changes the State of Oregon made to its federally authorized RCRA Hazardous Waste Management Program...

  2. 41 CFR 301-73.1 - What does the Federal travel management program include?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 4 2010-07-01 2010-07-01 false What does the Federal travel management program include? 301-73.1 Section 301-73.1 Public Contracts and Property Management... PROGRAMS General Rules § 301-73.1 What does the Federal travel management program include? The Federal...

  3. 34 CFR 685.100 - The William D. Ford Federal Direct Loan Program.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false The William D. Ford Federal Direct Loan Program. 685...) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION WILLIAM D. FORD FEDERAL DIRECT LOAN PROGRAM Purpose and Scope § 685.100 The William D. Ford Federal Direct Loan Program. (a) Under the William D. Ford...

  4. Self-Denial in Federalizing Power in the European Union

    DEFF Research Database (Denmark)

    Sweeney, Richard J.

    2003-01-01

    Because the conflicts that led to the American Revolution mainly arose fromconstitutional issues, the history of these conflicts offers lessons for the design of the newEuropean Union constitution. One lesson is the importance of avoiding needless conflictsbetween federal and member......-state governments. In particular, forcing decisions on wheresovereignty lies may cause great conflict. Another lesson is that a federal system depends ongood will among the federal and member-state governments, and because this good will is easilydissipated, efforts should be made to nurture it. Federal exercise...

  5. An overview of federal government financial involvement in the Canadian nuclear program

    International Nuclear Information System (INIS)

    Wallace, T.W.

    1981-01-01

    The government of Canada has had a financial involvement with the nuclear industry in four areas: nuclear power development, including expenditures for research and development, prototype reactors, and regulation; uranium industry support, including the operations of Eldorado Nuclear Ltd. and the uranium stockpiling program; the financing of nuclear reactors, activities in which the federal government has acted as a banker for the sale of reactors; and heavy water production. Up to 1978-79 total federal expenditures of around $3.4 billion in current collars had been invested. Of this amount, about 56 percent was associated with nuclear power development, 2 percent with uranium industry support, 22 percent with heavy water, and 22 percent with financing reactor sales

  6. Technologies for Distributed Energy Resources. Federal Energy Management Program (FEMP) Technical Assistance Fact Sheet

    International Nuclear Information System (INIS)

    Pitchford, P.; Brown, T.

    2001-01-01

    This four-page fact sheet describes distributed energy resources for Federal facilities, which are being supported by the U.S. Department of Energy's (DOE's) Federal Energy Management Program (FEMP). Distributed energy resources include both existing and emerging energy technologies: advanced industrial turbines and microturbines; combined heat and power (CHP) systems; fuel cells; geothermal systems; natural gas reciprocating engines; photovoltaics and other solar systems; wind turbines; small, modular biopower; energy storage systems; and hybrid systems. DOE FEMP is investigating ways to use these alternative energy systems in government facilities to meet greater demand, to increase the reliability of the power-generation system, and to reduce the greenhouse gases associated with burning fossil fuels

  7. A coordinated state/federal volunteer training program

    International Nuclear Information System (INIS)

    Chuba, T.J.; Dimmick, E.

    1993-01-01

    While the sinking of the Tenyo Maru and resultant oil spill off Washington's Olympic Peninsula in July 1991 was tragic, it fostered the birth of a cooperative effort by federal and state agencies to train volunteer responders prior to another oil spill. This effort, under the auspices of an Oregon nonprofit group known as SOLV (Stop Oregon Littering and Vandalism), is known as the SOS (SOLV Oil Spill) Steering committee. The purpose of the group is to train volunteer responders to aid federal, state, and local agencies in future oil spill cleanup activities. For the first time in the nation, governmental agencies have joined with corporations and environmental organizations in coordinating educational programs involving citizens in oil spill remediation efforts before the advent of a major spill that could affect coastal areas or inland waterways. Free classes meeting federal and state hazardous waste training criteria are offered quarterly to citizens interested in either volunteer wildlife rehabilitation or beach cleanup. The four-hour course was developed by the US Coast Guard, Oregon State Department of Environmental Quality, and Oregon OSHA. Topics covered include agency responsibilities, site safety plans, general safety, toxicology, material safety data sheets, personal protective equipment, decontamination, heat stress, helicopter safety, and wildlife safety. In addition to course materials, participants receive a certificate and identification card verifying their training. A 1-800 number, computer data base, and newsletter are used to maintain contact with graduates. So far more than 600 volunteers have been trained and are ready to assist should the need arise

  8. EPRI nuclear power plant decommissioning technology program

    International Nuclear Information System (INIS)

    Kim, Karen S.; Bushart, Sean P.; Naughton, Michael; McGrath, Richard

    2011-01-01

    The Electric Power Research Institute (EPRI) is a non-profit research organization that supports the energy industry. The Nuclear Power Plant Decommissioning Technology Program conducts research and develops technology for the safe and efficient decommissioning of nuclear power plants. (author)

  9. 2014 Water Power Program Peer Review Report

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-08-18

    The Water Power Peer Review Meeting was held February 24-28, 2014 in Arlington, VA. Principle investigators from the Energy Department National Laboratories, academic, and industry representatives presented the progress of their DOE-funded research. This report documents the formal, rigorous evaluation process and findings of nine independent reviewers who examined the technical, scientific, and business results of 96 projects of the Water Power Program, as well as the productivity and management effectiveness of the Water Power Program itself.

  10. Quality assurance program for isotopic power systems

    Energy Technology Data Exchange (ETDEWEB)

    Hannigan, R.L.; Harnar, R.R.

    1982-12-01

    This report summarizes the Sandia National Laboratories Quality Assurance Program that applies to non-weapon (reimbursable) Radioisotopic Thermoelectric Generators. The program has been implemented over the past 16 years on power supplies used in various space and terrestrial systems. The quality assurance (QA) activity of the program is in support of the Department of Energy, Office of Space Nuclear Projects. Basic elements of the program are described in the report and examples of program decumentation are presented.

  11. Quality assurance program for isotopic power systems

    International Nuclear Information System (INIS)

    Hannigan, R.L.; Harnar, R.R.

    1982-12-01

    This report summarizes the Sandia National Laboratories Quality Assurance Program that applies to non-weapon (reimbursable) Radioisotopic Thermoelectric Generators. The program has been implemented over the past 16 years on power supplies used in various space and terrestrial systems. The quality assurance (QA) activity of the program is in support of the Department of Energy, Office of Space Nuclear Projects. Basic elements of the program are described in the report and examples of program decumentation are presented

  12. U.S. EPA Federal Technology Transfer Program Fact Sheet

    Science.gov (United States)

    The Federal Technology Transfer Act (FTTA), enacted by Congress in 1986 and building on previous legislation, improves access to federal laboratories by non-federal organizations for research and development opportunities.

  13. A concept for performance management for Federal science programs

    Science.gov (United States)

    Whalen, Kevin G.

    2017-11-06

    The demonstration of clear linkages between planning, funding, outcomes, and performance management has created unique challenges for U.S. Federal science programs. An approach is presented here that characterizes science program strategic objectives by one of five “activity types”: (1) knowledge discovery, (2) knowledge development and delivery, (3) science support, (4) inventory and monitoring, and (5) knowledge synthesis and assessment. The activity types relate to performance measurement tools for tracking outcomes of research funded under the objective. The result is a multi-time scale, integrated performance measure that tracks individual performance metrics synthetically while also measuring progress toward long-term outcomes. Tracking performance on individual metrics provides explicit linkages to root causes of potentially suboptimal performance and captures both internal and external program drivers, such as customer relations and science support for managers. Functionally connecting strategic planning objectives with performance measurement tools is a practical approach for publicly funded science agencies that links planning, outcomes, and performance management—an enterprise that has created unique challenges for public-sector research and development programs.

  14. Nuclear Power Infrastructure Development Program: Korean Education Program

    International Nuclear Information System (INIS)

    Choi, Sung Yeol; Hwang, Il Soon; Kim, Si Hwan

    2009-01-01

    Many countries have decided nuclear power for next energy resources as one of the long-term energy supply options. IAEA projected nuclear power expansion up to 2030 reaching between 447 GWe and 691 GWe compared to 370 GWe and 2660 TWh at the end of 2006. Both low and high projection is accompanied with new nuclear power plant constructions respectively 178 and 357, about 11 units per year, and most new construction is in North America, the Far East, Eastern Europe, the Middle East, and Southeast Asia. During the last forty years, thirty three countries have established commercial nuclear power programs but only some of them have developed comprehensive and large scale peaceful nuclear power infrastructure. Although various cooperation and guidance program of nuclear power infrastructure, developing appropriate environment and infrastructure of nuclear power plant is still challenging problems for developing countries launching nuclear power program. With increasing the demand of safety and safeguard from international society, creating appropriate infrastructure becomes essential requirements in national nuclear power program. In the viewpoint of developing countries, without sufficient explanation and proper guidance, infrastructure could be seen only as another barrier in its nuclear power program. The importance of infrastructure development would be obscured by ostensible business and infrastructure program can result in increasing entering barriers to peaceful nuclear power application field without benefits to developing countries and international community. To avoid this situation by providing enough explanation and realistic case example and cooperate with the countries wanting to establish comprehensive nuclear power infrastructure in the peaceful applications, we are creating the education program of infrastructure development with basic guidelines of the IAEA infrastructure series and Korean experiences from least developed country to advanced country

  15. Impacts on power reactor health physics programs

    International Nuclear Information System (INIS)

    Meyer, B.A.

    1991-01-01

    The impacts on power reactor health physics programs form implementing the revised 10 CFR Part 20 will be extensive and costly. Every policy, program, procedure and training lesson plan involving health physics will require changes and the subsequent retraining of personnel. At each power reactor facility, hundreds of procedures and thousands of people will be affected by these changes. Every area of a power reactor health physics program will be affected. These areas include; ALARA, Respiratory Protection, Exposure Control, Job Coverage, Dosimetry, Radwaste, Effluent Accountability, Emergency Planning and Radiation Worker Training. This paper presents how power reactor facilities will go about making these changes and gives possible examples of some of these changes and their impact on each area of power reactor health physics program

  16. The NASA CSTI High Capacity Power Program

    International Nuclear Information System (INIS)

    Winter, J.M.

    1991-09-01

    The SP-100 program was established in 1983 by DOD, DOE, and NASA as a joint program to develop the technology necessary for space nuclear power systems for military and civil applications. During 1986 and 1987, the NASA Advanced Technology Program was responsible for maintaining the momentum of promising technology advancement efforts started during Phase 1 of SP-100 and to strengthen, in key areas, the chances for successful development and growth capability of space nuclear reactor power systems for future space applications. In 1988, the NASA Advanced Technology Program was incorporated into NASA's new Civil Space Technology Initiative (CSTI). The CSTI program was established to provide the foundation for technology development in automation and robotics, information, propulsion, and power. The CSTI High Capacity Power Program builds on the technology efforts of the SP-100 program, incorporates the previous NASA advanced technology project, and provides a bridge to the NASA exploration technology programs. The elements of CSTI high capacity power development include conversion systems: Stirling and thermoelectric, thermal management, power management, system diagnostics, and environmental interactions. Technology advancement in all areas, including materials, is required to provide the growth capability, high reliability, and 7 to 10 year lifetime demanded for future space nuclear power systems. The overall program will develop and demonstrate the technology base required to provide a wide range of modular power systems while minimizing the impact of day/night operations as well as attitudes and distance from the Sun. Significant accomplishments in all of the program elements will be discussed, along with revised goals and project timelines recently developed

  17. Quality assurance program for nuclear power plants

    International Nuclear Information System (INIS)

    Gamon, T.H.

    1976-02-01

    The Topical Report presented establishes and provides the basis for the Brown and Root Quality Assurance Program for Nuclear Power Plants from which the Brown and Root Quality Assurance Manual is prepared and implemented. The Quality Assurance Program is implemented by the Brown and Root Power Division during the design, procurement, and construction phases of nuclear power plants. The Brown and Root Quality Assurance Program conforms to the requirements of Nuclear Regulatory Commission Regulation 10 CFR 50, Appendix B; to approved industry standards such as ANSI N45.2 and ''Daughter Standards''; or to equivalent alternatives as indicated in the appropriate sections of the report

  18. Quality assurance program for nuclear power plants

    International Nuclear Information System (INIS)

    Gamon, T.H.

    1976-06-01

    This topical report establishes and provides the basis for the Brown and Root Quality Assurance Program for Nuclear Power Plants from which the Brown and Root Quality Assurance Manual is prepared and implemented. The Quality Assurance Program is implemented by the Brown and Root Power Division during the design, procurement, and construction phases of nuclear power plants. The Brown and Root Quality Assurance Program conforms to the requirements of Nuclear Regulatory Commission Regulation 10 CFR 50, Appendix B; to approved industry standards such as ANSI N45.2 and ''Daughter Standards''; or to equivalent alternatives as indicated in the appropriate sections of this report

  19. 78 FR 4478 - Federal Employees Dental and Vision Insurance Program: Application Process for Contract Awards

    Science.gov (United States)

    2013-01-22

    ... process is being changed to be in line with the process used for the Federal Employees Health Benefits... OFFICE OF PERSONNEL MANAGEMENT Federal Employees Dental and Vision Insurance Program: Application... Process for Federal Employees Dental and Vision Insurance Program Contract Awards. SUMMARY: The U. S...

  20. 78 FR 77366 - Federal Employee Dental and Vision Insurance Program; Qualifying Life Event Amendments

    Science.gov (United States)

    2013-12-23

    ... the Federal Employees Health Benefits (FEHB) Program. DATES: Comment date: Comments are due on or... enrollment status under the Federal Employee Dental and Vision Insurance Program. OPM is proposing these... for FEDVIP enrollment changes and therefore better align FEDVIP with the Federal Employees Health...

  1. 49 CFR 268.5 - Federal funding sources for the Maglev Deployment Program.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Federal funding sources for the Maglev Deployment... TECHNOLOGY DEPLOYMENT PROGRAM Overview § 268.5 Federal funding sources for the Maglev Deployment Program. (a) Federal Maglev Funds. Section 322 of Title 23 provides for the following funds for the Maglev Deployment...

  2. 77 FR 14972 - Discrimination on the Basis of Disability in Federally Assisted Programs and Activities

    Science.gov (United States)

    2012-03-14

    ... DEPARTMENT OF EDUCATION 34 CFR Part 104 Discrimination on the Basis of Disability in Federally... regulations, which prohibit discrimination on the basis of disability in federally assisted programs and...\\ which prohibits discrimination on the basis of disability \\2\\ in federally assisted programs or...

  3. Virginia power nuclear power station engineer training program

    International Nuclear Information System (INIS)

    Williams, T.M.; Haberstroh-Timpano, S.

    1987-01-01

    In response to the Institute of Nuclear Power Operations (INPO) accreditation requirements for technical staff and manager, Virginia Power developed the Nuclear Power Station Engineer Training Programs (NPSETP). The NPSETP is directed toward enhancing the specific knowledge and skills of company engineers, especially newly hired engineers. The specific goals of the program are to promote safe and reliable plant operation by providing engineers and appropriate engineering technicians with (1) station-specific basic skills; (2) station-specific specialized skills in the areas of surveillance and test, plant engineering, nuclear safety, and in-service inspection. The training is designed to develop, maintain, and document through demonstration the required knowledge and skills of the engineers in the identified groups at North Anna and Surry Power Stations. The program responds to American National Standards Institute, INPO, and US Nuclear Regulatory Commission standards

  4. Federal Geothermal Research Program Update Fiscal Year 2004

    Energy Technology Data Exchange (ETDEWEB)

    2005-03-01

    The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. The Geothermal Technologies Program (GTP) works in partnership with industry to establish geothermal energy as an economically competitive contributor to the U.S. energy supply. Geothermal energy production, a $1.5 billion a year industry, generates electricity or provides heat for direct use applications. The technologies developed by the Geothermal Technologies Program will provide the Nation with new sources of electricity that are highly reliable and cost competitive and do not add to America's air pollution or the emission of greenhouse gases. Geothermal electricity generation is not subject to fuel price volatility and supply disruptions from changes in global energy markets. Geothermal energy systems use a domestic and renewable source of energy. The Geothermal Technologies Program develops innovative technologies to find, access, and use the Nation's geothermal resources. These efforts include emphasis on Enhanced Geothermal Systems (EGS) with continued R&D on geophysical and geochemical exploration technologies, improved drilling systems, and more efficient heat exchangers and condensers. The Geothermal Technologies Program is balanced between short-term goals of greater interest to industry, and long-term goals of importance to national energy interests. The program's research and development activities are expected to increase the number of new domestic geothermal fields, increase the success rate of geothermal well drilling, and reduce the costs of constructing and operating geothermal power plants. These improvements will increase the quantity of economically viable geothermal resources, leading in turn to an increased number of geothermal power facilities serving more energy demand. These new geothermal projects will take advantage of geothermal resources in locations where development is not currently

  5. Federal Geothermal Research Program Update - Fiscal Year 2004

    Energy Technology Data Exchange (ETDEWEB)

    Patrick Laney

    2005-03-01

    The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. The Geothermal Technologies Program (GTP) works in partnership with industry to establish geothermal energy as an economically competitive contributor to the U.S. energy supply. Geothermal energy production, a $1.5 billion a year industry, generates electricity or provides heat for direct use applications. The technologies developed by the Geothermal Technologies Program will provide the Nation with new sources of electricity that are highly reliable and cost competitive and do not add to America's air pollution or the emission of greenhouse gases. Geothermal electricity generation is not subject to fuel price volatility and supply disruptions from changes in global energy markets. Geothermal energy systems use a domestic and renewable source of energy. The Geothermal Technologies Program develops innovative technologies to find, access, and use the Nation's geothermal resources. These efforts include emphasis on Enhanced Geothermal Systems (EGS) with continued R&D on geophysical and geochemical exploration technologies, improved drilling systems, and more efficient heat exchangers and condensers. The Geothermal Technologies Program is balanced between short-term goals of greater interest to industry, and long-term goals of importance to national energy interests. The program's research and development activities are expected to increase the number of new domestic geothermal fields, increase the success rate of geothermal well drilling, and reduce the costs of constructing and operating geothermal power plants. These improvements will increase the quantity of economically viable geothermal resources, leading in turn to an increased number of geothermal power facilities serving more energy demand. These new geothermal projects will take advantage of geothermal resources in locations where development is not currently possible or

  6. 75 FR 66686 - Defense Federal Acquisition Regulation Supplement; Balance of Payments Program Exemption for...

    Science.gov (United States)

    2010-10-29

    ... Federal Acquisition Regulation Supplement; Balance of Payments Program Exemption for Commercial... Balance of Payments Program for construction material that is commercial information technology. DATES... the Balance of Payments Program for commercial information technology to be used in overseas...

  7. The Bonneville Power Administration's geothermal program

    International Nuclear Information System (INIS)

    Darr, G.D.

    1990-01-01

    Despite being a power source with many desirable characteristics, geothermal has not been developed in the Pacific Northwest because of high costs, high risks, and the lack of a market for power. The region will require new power sources in the 1990s, and will need to know to what extent it can rely on geothermal. The Bonneville Power Administration has developed a geothermal RD and D program which includes a proposal to award power contracts to three pilot projects in the Northwest. Public outreach efforts, environmental base line studies, and economic and land use impact studies will also be undertaken. In this paper two projects already under way are discussed

  8. The Russian Federation's Ministry of Atomic Energy: Programs and Developments

    International Nuclear Information System (INIS)

    CM Johnson

    2000-01-01

    This paper reviews select programs driving the Ministry of Atomic Energy of the Russian Federation's (Minatom) efforts to raise funds, comments on their potential viability, and highlights areas likely to be of particular concern for the US over the next three to five years. The paper's findings are: (1) Despite numerous cabinet displacements throughout the Yeltsin administration, Yevgeny Adamov was reappointed Minister on four occasions. With Boris Yeltsin's January 1, 2000 resignation, Adamov's long-term position as the head of the Ministry is more tenuous, but he will likely retain his position until at least the March 2000 elections. Acting President Vladimir Putin is unlikely to reorganize his cabinet prior to that date and there are no signs that Putin is dissatisfied with Adamov's leadership of Minatom. (2) Adamov's chief priorities are downsizing Minatom's defense sector, increasing the oversight of subsidiary bodies by the central bureaucracy and consolidating commercial elements of the Ministry within an umbrella organization called Atomprom. (3) Viktor Mikhaylov, Adamov's predecessor and critic of his reform efforts, has been relieved of his duties as First Deputy Minister. While he retains his positions as Chief of the Science Councils and Chief Scientist at Arzamas-16, his influence on Minatom's direction is greatly diminished. Adamov will likely continue his efforts to further marginalize Mikhaylov in the coming year. (4) Securing extra-budgetary sources of income continues to be the major factor guiding Minatom's international business dealings. The Ministry will continue to aggressively promote the sale of nuclear technology abroad, often to countries with questionable nonproliferation commitments. (5) Given the financial difficulties in Russia and Minatom's client states, however, few nuclear development programs will come to fruition for a number of years, if ever. Nevertheless, certain peaceful nuclear cooperation agreements should be carefully

  9. Nuclear power program and environment

    International Nuclear Information System (INIS)

    Subramanya, S.K.; Gupta, J.P.

    2012-01-01

    Access to energy is one of the basic requirements for human development. To meet these growing energy needs without creating negative side effects is a challenge. The possibility of global climate change resulting from an increase in GHG concentrations in the atmosphere due to developmental activities is a major global concern. India is passing through the process of economic growth. Although India has not created the problem of climate change, India stands ready to be a part of the solution. The largest chunk of emissions was from electricity generation amounting to 65 percent of the total CO 2 equivalent emissions from the energy sector. Nuclear energy and renewables stand as sources for electricity with minimum GHG emission. Production of electricity from any form of primary energy has some environmental effect. A balanced assessment is needed. Nuclear power is of importance to India because it has potentially unlimited resource base, does not emit GHGs and, depending on location, has potentially favourable economics versus coal. In the long term, if we are to preserve the environment, it will be necessary to tap this source to the maximum extent feasible, In nuclear power stations, all its wastes are contained. India being home to nearly a third of the entire world's thorium, the strategies for large scale deployment of nuclear energy is focused towards utilization of thorium. The electricity potential of 3-stage programme is estimated to be about 2 lakh GWe-yr. Nuclear Power Corporation of India Limited is currently operating 20 reactors and has accumulated more than 337 reactor-years of experience in safe operation. A defence-in-depth approach is at the heart of safety philosophy, where there are several lines of defence, one backing another. Radiation is relevant for nuclear, coal, oil, gas and geothermal power plants. The essential task is to prevent excessive amounts now or in the future. One of the guiding principles adopted is to ensure that radiation

  10. National energy and nuclear power system plans of the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Schmidt-Kuester, W.J.

    1977-01-01

    Continuous and secure procurement of energy is of vital importance for our national economy. This has been demonstrated drastically during and after the energy crisis in 1973. Therefore, the aim of energy policy in the Federal Republic of Germany is to make energy available: (1) in always sufficient quantities; (2) with a maximum degree of security of supply; (3) in a way to protect the environment to a maximum extent; (4) at the cheapest possible cost to the economy. The other aim of our energy policy is to diversify the basis of primary energy sources in order to reduce our dependence on imported oil as fast as this is possible under reasonable economic conditions. For these reasons our efforts are concentrated on the development of nuclear and new non-nuclear energy sources as well as on the development of technologies on energy conservation. The concept of the Federal Republic of Germany for the development of new energy sources is outlined in the FRG program of energy research and technology. It combines the continuation of the 4. nuclear program of FRG (1973-1976) and the skeleton program of non-nuclear energy research (1974-1977). In continuation of existing activites the main object of the new program will be again the development of nuclear energy concentrating on advanced reactor systems, nuclear fuel cycle and safety and radiation protection research. In addition large efforts are made in the area of coal technology, the development of new primary and secondary energy sources and methods for energy conservation. Until 1985 in the FRG the percentage of nuclear energy will be increased from 2% of today to 15% in 1985, i.e. approximately 45.000 MWe. The development of nuclear power systems will be performed by industry and nuclear research centers. At present there are about 25.000 people working in this area

  11. Program for analyzing power boost tests

    International Nuclear Information System (INIS)

    Wills, C.A.

    1982-03-01

    A rapid increase of power in a reactor produces a failure in the fuel. Experiments to study the conditions in the NRU reactor after such failures have been planned and carried out. Given the concentrations of specified isotopes at a number of times over the length of an experiment as produced for example, from the program SARGS and the power history of the reactor, this program calculates the release rates, escape rate coefficients, and fractional releases for the isotopes. These values may be optionally printed and plotted. Decay schemes for a limited number of mass numbers are implemented. The program is written in FORTRAN and runs on the CDC 6600 - CYBER 170 system

  12. Pinning down the Constitution: Interactively Teaching Congress's Power, Federalism, and Constitutional Interpretation

    Science.gov (United States)

    Emenaker, Ryan

    2014-01-01

    "Pin-the-Tail-on-the-Constitution" is an engaged-learning activity that has been conducted in 26 classes over the past four years. The activity teaches multiple themes commonly included in a variety of courses on American politics such as federalism, congressional powers, the role of the federal courts, and the relevance of the commerce…

  13. Licensing and regulatory control of nuclear power plants in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Obenhaus, W.

    1976-01-01

    The paper deals with the legal background, the role of the 'Bund' (Federation) and the 'Laender' (States) in the field of atomic energy and radiation protection law and the licensing procedure for nuclear power plants. (RW) [de

  14. 76 FR 62312 - Multi-Agency Informational Meeting Concerning Compliance With the Federal Select Agent Program...

    Science.gov (United States)

    2011-10-07

    ... interested individuals to obtain specific regulatory guidance and information on standards concerning biosafety and biosecurity issues related to the Federal Select Agent Program. CDC, APHIS, and CJIS...

  15. 10 CFR 1.41 - Office of Federal and State Materials and Environmental Management Programs.

    Science.gov (United States)

    2010-01-01

    ... Environmental Management Programs. (a) The Office of Federal and State Materials and Environmental Management...) The Office of Federal and State Materials and Environmental Management Programs— (1) Plans and directs... 10 Energy 1 2010-01-01 2010-01-01 false Office of Federal and State Materials and Environmental...

  16. 41 CFR 102-193.10 - What are the goals of the Federal Records Management Program?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What are the goals of the Federal Records Management Program? 102-193.10 Section 102-193.10 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION...

  17. 76 FR 38281 - Federal Employees Health Benefits Program: New Premium Rating Method for Most Community Rated...

    Science.gov (United States)

    2011-06-29

    ... CFR Parts 1602, 1615, et al. Federal Employees Health Benefits Program: New Premium Rating Method for... Part 890; 48 CFR Parts 1602, 1615, 1632, and 1652 RIN 3206-AM39 Federal Employees Health Benefits..., 2011 (76 FR 36857). The document amends the Federal Employees Health Benefits (FEHB) regulations at 5...

  18. 78 FR 26879 - Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal...

    Science.gov (United States)

    2013-05-08

    ... Prospective Payment System for Federal Fiscal Year 2014; Proposed Rule #0;#0;Federal Register / Vol. 78, No... Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal Year 2014 AGENCY... IRF prospective payment system's (PPS) case-mix groups and a description of the methodology and data...

  19. Improving regulatory effectiveness in Federal/State siting actions: Federal/State regulatory permitting actions in selected nuclear power station licensing cases

    International Nuclear Information System (INIS)

    Baroff, J.

    1977-06-01

    The Federal/State regulatory permitting actions in 12 case histories of nuclear power station licensing in nine different states are documented. General observations regarding Federal/State siting roles in the siting process are included. Eleven of the case histories are illustrated with a logic network that gives the actions of the utilities in addition to the Federal/State permits

  20. 75 FR 42189 - Foreign Institutions-Federal Student Aid Programs

    Science.gov (United States)

    2010-07-20

    ... negotiators also noted that for-profit foreign institutions might have difficulty raising capital based on... majority of the Department's proposed language but several non-Federal negotiators continued to raise...-Federal negotiators were generally supportive of the Department's proposal. However, they did raise some...

  1. 77 FR 11367 - Defense Federal Acquisition Regulation Supplement; Extension of the Test Program for Negotiation...

    Science.gov (United States)

    2012-02-24

    ...DoD is issuing a final rule amending the Defense Federal Acquisition Regulation Supplement to extend the program period for the DoD Test Program for Negotiation of Comprehensive Small Business Subcontracting Plans.

  2. Funding programs in the energy sector for medium-sized enterprises. Federal and national support programs; Foerderprogramme im Energiebereich fuer mittelstaendische Unternehmen. Bundes- und Landesprogramme

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-06-15

    This brochure under consideration is a summary table of the national support programs of the Federal State Baden-Wuerttemberg and the Federal support programs. In particular, there are the following national support programs: (1) Climate protection - Plus support programme; (2) Energy efficiency financing for small and medium-sized enterprises; (3) Energy efficiency financing for large enterprises; (4) ERDF 'Heating and heating networks with renewable energy sources'; (5) Demonstration projects energy; (6) Bioenergy competition Baden-Wuerttemberg; (7) Promotion of bioenergy villages; (8) New energies - Energy from the countryside; (9) Support program Coaching; (10) Environmental protection consultancy and energy conservation consultancy. The following Federal support programs are described: (1) Measures for the utilization of renewable energy sources; (2) KfW program 'Renewable energy sources'; (3) Promotion of cogeneration systems up to 20 kW4{sub el.}; (4) Promotion of measures at commercial refrigeration systems; (5) Energy consultancy for small and medium-sized enterprises; (6) KfW - energy efficiency program; (7) BMU - environmental innovation programme; (8) Renewable Energy Law; (9) Act for the Retention, Modernisation and Expansion of Combined Heat and Power Act; (10) Funding lines of the Federal Foundation for the Environment.

  3. Coal mining in the power industry of the Federal Republic of Germany in 2016

    International Nuclear Information System (INIS)

    2017-11-01

    The contribution under consideration reports on the coal mining in the Federal Republic of Germany in the year 2016. Statistical data are presented for the power market and coal market, hard coal mining as well as the brown coal mining. These data consider the energy consumption in Germany, power production, iron and steel production, utilization, re-cultivation and employees.

  4. Coal mining in the power industry of the Federal Republic of Germany in 2015

    International Nuclear Information System (INIS)

    2016-11-01

    The contribution under consideration reports on the coal mining in the Federal Republic of Germany in the year 2015. Statistical data are presented for the power market and coal market, hard coal mining as well as the brown coal mining. These data consider the energy consumption in Germany, power production, iron and steel production, utilization, re-cultivation and employees.

  5. Federal Programs Supporting Educational Change, Vol. VII: Factors Affecting Implementation and Continuation.

    Science.gov (United States)

    Berman, Paul; And Others

    This report is one of three volumes that describe the second phase of a study that examined the implementation of four federal change agent programs related to education. Phase 2 of the study focused on what happens to local projects in the two largest change agent programs--ESEA Title III and ESEA Title VII--when federal funding stops. This…

  6. 76 FR 31998 - Federal Employees Health Benefits Program: Medically Underserved Areas for 2012

    Science.gov (United States)

    2011-06-02

    ... OFFICE OF PERSONNEL MANAGEMENT Federal Employees Health Benefits Program: Medically Underserved... Underserved Areas under the Federal Employees Health Benefits (FEHB) Program for calendar year 2012. This is... certain FEHB plans who receive covered health services in States with critical shortages of primary care...

  7. 75 FR 32972 - Federal Employees Health Benefits Program; Medically Underserved Areas for 2011

    Science.gov (United States)

    2010-06-10

    ... OFFICE OF PERSONNEL MANAGEMENT Federal Employees Health Benefits Program; Medically Underserved... Underserved Areas under the Federal Employees Health Benefits (FEHB) Program for calendar year 2011. This is... certain FEHB plans who receive covered health services in States with critical shortages of primary care...

  8. 75 FR 59105 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs: Federal Drug Testing...

    Science.gov (United States)

    2010-09-27

    ... 2105-AE03 Procedures for Transportation Workplace Drug and Alcohol Testing Programs: Federal Drug... the Federal workplace drug testing program but also pointed out that ``* * * the Department of.... Executive Order 12866 and Regulatory Flexibility Act This Interim Final Rule is not significant for purposes...

  9. 76 FR 34086 - Mandatory Guidelines for Federal Workplace Drug Testing Programs; Request for Information...

    Science.gov (United States)

    2011-06-10

    ... Mandatory Guidelines for Federal Workplace Drug Testing Programs; Request for Information Regarding Specific Issues Related to the Use of the Oral Fluid Specimen for Drug Testing AGENCY: Substance Abuse and Mental... may be applied to the Mandatory Guidelines for Federal Workplace Drug Testing Programs (oral fluid...

  10. The Import-Substitution Adaptation of Power Engineering Programs

    Directory of Open Access Journals (Sweden)

    Aleksandr N. Kuzminov

    2017-03-01

    Full Text Available The realization problem of the import substitution policy in the context of existing programs for the individual branches development is considered in the paper on the example of power engineering. There is a contradiction to the objective of programs reflected in the process of alignment, which consists in stabilizing on the one hand and on the development of innovative on the other hand. In addition, the analysis of the implementation of power engineering of the Russian Federation for 2010-2020 and up to 2030 revealed significant shortcomings and deficiencies that reinforce the negative trends of this pairing. Classification of problems and purpose allowed choosing the most significant conceptual directions, methodologically based on the ideas of self-organization and balance, which can get instrumentality software by adapting programs for the development of power engineering in the system of the European model of Industry 4.0. As a fundamental position addresses the need for such a project, which would ensure the greatest impact with limited resources, including public funding, which lags far behind foreign. It is proposed to transform the efforts to implement the existing strategies of industry development in view of the policy of import substitution based on the implementation of the program of production of a balanced range of innovative products and providing replacement of imported equipment and the formation of the technological basis for the development of the industry

  11. Mastering C pointers tools for programming power

    CERN Document Server

    Traister, Robert J

    2014-01-01

    If you don't fully understand C pointers and how they are used, you're not getting the most out of C programming. This book features complete coverage on using and controlling C language pointers to make C applications more powerful and expressive. This new edition is completely updated and revised to reflect the changes that have been brought about with the full adoption of ANSI C. All discussions and program examples have been updated, and reading materials necessary for any modern ANSI C programmer have also been added.Includes one 3 1/2"" disk containing all of the working programs and m

  12. DEVELOPMENT OF RUSSIAN FEDERATION POWER SELLING COMPANY STRATEGIC MANAGEMENT

    Directory of Open Access Journals (Sweden)

    S. V. Grishkevich

    2011-01-01

    Full Text Available Strategic for power selling companies (PSC are buying, selling and investment activities. Buying activities are to be planned, selling activities predicted and both optimized by PSC on the basis of price and consumer number dynamics with due account of other factors. Very important is to develop the market of derivative instruments (derivatives as part of the risk management mechanism at all levels including that of the state, to use up-to-date and ecologically favorable technologies as well as renewable energy sources with due account of ecology improvement measurement costs.

  13. Older Workers and Federal Work Programs: The Korean Senior Employment Program (KSEP).

    Science.gov (United States)

    Choi, Eunhee

    2016-01-01

    Federal older worker programs are attracting attention due to the growing number of older workers across the world. They are uniquely situated to provide out-of-market work opportunities to older job seekers, who often find their age a barrier to securing desirable jobs. In 2004, the Korean government established its own program, the Korean Senior Employment Program (KSEP); however, literature for international readers on this innovative program is lacking. Thus, this article aims to provide an in-depth description of KSEP and a brief comparison between the Senior Community Service Employment Program in the U.S. and KSEP. The unique characteristics of KSEP include having the dual program foci on supplemental income and social participation; expanding work opportunities in the private sector beyond community-based jobs; accepting participants who are financially disadvantaged as well as those with a high desire for social participation regardless of their income; and broadening work opportunities for those with professional skills beyond repetitive, simple, and temporary jobs. This article may offer helpful insights to older worker advocates from various countries in creating or modifying their programs.

  14. 77 FR 68768 - Electricity Market Transparency Provisions of Section 220 of the Federal Power Act; Notice of...

    Science.gov (United States)

    2012-11-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM10-12-000] Electricity Market Transparency Provisions of Section 220 of the Federal Power Act; Notice of Technical Conference...., Washington, DC 20426. \\1\\ Electricity Market Transparency Provisions of Section 220 of the Federal Power Act...

  15. Reducing Health Services for Refugees Through Reforms to the Interim Federal Health Program

    Directory of Open Access Journals (Sweden)

    Andrew C. Stevenson

    2018-04-01

    Full Text Available Since 1957 the Interim Federal Health Program (IFHP has provided temporary health care coverage to refugees and refugee claimants, but in 2012 the Conservative government reformed the IFHP, reducing, or eliminating access to health services for these groups. The government framed the changes around fairness and safety, stating that it would save tax payers $100 million over five years, reduce incentive for migrants with unfounded refugee claims from coming to Canada, protect public health and safety, and defend the integrity of the immigration system. With a Conservative majority, the reform was easily implemented despite a lack of evidence supporting these claims. In 2014, the Federal Court rejected the government's notion of fairness and safety, ruling that the cuts were cruel and unusual treatment of an already vulnerable population. The government appealed this ruling but, in 2016, the Liberals took power and restored funding to the IFHP to pre-2012 levels. Ad hoc evaluations predicted inequitable and adverse impacts on refugees, negative impacts on health, and increased costs to refugees, provincial governments, and health providers. Overall the threats and weaknesses of this reform clearly outweighed the few and unconvincing opportunities and strengths of the program, leading to its demise.

  16. 76 FR 31416 - Federal Acquisition Regulation; Oversight of Contractor Ethics Programs

    Science.gov (United States)

    2011-05-31

    ...-AL92 Federal Acquisition Regulation; Oversight of Contractor Ethics Programs AGENCY: Department of... that contractors have implemented the mandatory contractor business ethics program requirements. DATES... to Improve DoD's Oversight of Contractor Ethics Programs. The ethics program requirement flows from...

  17. Startup program after SGR and power increase

    International Nuclear Information System (INIS)

    Krajnc, B.; Dudas, M.; Spiler, J.; Novsak, M.

    2000-01-01

    NPP Krsko replaced steam generators during the outage 2000. Parallel with the steam generator replacement all required systems modifications to accommodate new steam generators into the existing plant (upper feed,..) and support plant power increase of 6.3%, have been implemented. During the years 1997 - 2000 all the required licensing, technical analyses and systems verifications to support such plant changes have been completed. One of the activities within this effort was also the preparation of a detailed Plant Startup Program, which was subject of licensing review and approval process. An integrated plant startup program was then developed based on the plant startup test program, performed regularly during plant startup after refueling and above-mentioned Plant Startup Program. These additional tests defined by the Startup Test Program have been required due to new steam generators, steam generator replacement and related modifications, and power increase from previous 1882 MWt to 2000 MWt. During the preparation period, a startup team was established and procedures were written. All procedures sensitive to the operation were validated on the plant specific simulator. This paper presents more about the Startup Test Program, analysis of its implementation, the results of some key tests as well as the lessons learned. (author)

  18. Revised inspection program for nuclear power plants

    International Nuclear Information System (INIS)

    1978-01-01

    The United States Nuclear Regulatory Commission (NRC) regulates nuclear power plants to assure adequate protection of the public and the environment from the dangers associated with nuclear materials. NRC fulfills this responsibility through comprehensive safety reviews of nuclear facilities, licensing of organizations that use nuclear materials, and continuing inspection. The NRC inspection program is currently conducted from the five regional offices in or near Philadelphia, Atlanta, Chicago, Dallas and San Francisco. Inspectors travel from the regional offices to nuclear power plants in various phases of construction, test and operation in order to conduct inspections. However, in June 1977 the Commission approved a revision to the inspection program that will include stationing inspectors at selected plants under construction and at all plants in operation. In addition, the revised program provides for appraising the performance of licensees on a national basis and involves more direct measurement and observation by NRC inspectors of work and tests in progress. The program also includes enhanced career management consisting of improved training and career development for inspectors and other professionals. The report was requested in the Conference Report on the NRC Authorization for Appropriations for Fiscal Year 1978. The report provides a discussion of the basis for both the current and revised inspection programs, describes these programs, and shows how the NRC inspection force will be trained and utilized. In addition, the report includes a discussion of the actions that will be taken to assure the objectivity of inspectors

  19. The situation of nuclear power in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Gassert, H.

    1982-01-01

    The industrial development of nuclear power, especially nuclear power plant technology, in the Federal Republic of Germany has reached a top level position worldwide with respect to availability and safety. The expansion of the use of nuclear power in the Federal Republic of Germany by comparison has been in a paradoxical situation for many years: the importance of this source of energy is being stressed again and again by politicians and industrialists, the speedy development of nuclear power described as indispensable for the national economy and the energy producing utilities. However, in actual practice, industry and the electricity utilities are facing no end of obstacles and difficulties which, ultimately, are beginning to jeopardize the major advantages of nuclear power, at least in the Federal Republic. Special difficulties arise not only in the completion of the prototypes of the two advanced reactor lines, i.e., the fast breeder and the high temperature reactor, but especially also in the completion of the fuel cycle by reprocessing plants, despite the fact that all legal conditions exist for allowing nuclear power to occupy the place found to be necessary also in the Federal Republic of Germany. Industry expects these complex effects on the economy to be recognized and taken into account especially on the political side before this important area of innovation suffers irreparable damage. (orig.) [de

  20. Economic consideration for Indonesia's nuclear power program

    International Nuclear Information System (INIS)

    Ahimsa, D.; Sudarsono, B.

    1987-01-01

    Indonesia experienced relatively high economic growth during the 1970s and the energy supply system was strained to keep up with demand. Several energy studies were thus carried out around 1980, including a nuclear power planning study and a nuclear plant feasibility study. During the 1980s, economic growth rates were subtantially lower, but surprisingly electricity demand remained fairly high. In 1984 it was therefore decided to update previous nuclear power studies. This effort was completed in 1986. Using energy projections and cost estimates developed during the updating of previous nuclear power studies, the paper discusses the economic justification for a nuclear power program in Indonesia. Results of the update, including computer runs of MAED and WASP models supplied by the IAEA, will be presented along with appropriate sensitivity analysis. These results are then analyzed in the light of 1986 developments in international oil price. Preparations for the forthcoming nuclear power program are described, including the construction of a multi-purpose reactor and associated laboratories in Serpong, near Jakarta. (author)

  1. Measuring program of the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Heinemann, K.

    1991-10-01

    Form May 21 to June 11 1991 seven measuring vans from the Federal Republic of Germany conducted investigations of radioactivity of environmental samples in the Russian Federation. The measurements were concentrated in the areas of Tula, Kaluga and Brjansk, which were contaminated with different concentrations by the Chernobyl accident. These investigations were financed by the 'Bundesministerium fuer Umwelt, Naturschutz und Reaktorsicherheit' and aimed at the information of the population. In this report, the measuring campaign is described and the results are presented. (orig.) [de

  2. Excel 2013 power programming with VBA

    CERN Document Server

    Walkenbach, John

    2013-01-01

    Maximize your Excel 2013 experience using VBA application development The new Excel 2013 boasts updated features, enhanced power, and new capabilities. Naturally, that means John Walkenbach returns with a new edition of his bestselling VBA Programming book and covers all the methods and tools you need to know in order to program with Excel. With this comprehensive guide, ""Mr. Spreadsheet"" shows you how to maximize your Excel experience using professional spreadsheet application development tips from his own personal bookshelf. Featuring a complete introduction to Visual Basic f

  3. Training within the French nuclear power program

    International Nuclear Information System (INIS)

    Jusselin, F.

    1987-01-01

    Training dispensed by the EDF Nuclear and Fossil Generation Division has contributed significantly toward successful startup and operation of French nuclear power plants. In 1986, the time-based availability of 900 MW PWRs totaled 85 %. This is just one example of how EDF training programs have benefited from 150 reactor-years of operating experience and the ensuing opportunities for perfecting and testing of training tool effectiveness. These programs have been adopted by utilities in other countries where suitable local facilities are making advantageous use of EDF training experience and methods. EDF expertise is also transferred to these countries indirectly through the simulator manufacturer

  4. Understanding Federal regulations as guidelines for classical biological control programs

    Science.gov (United States)

    Michael E. Montgomery

    2011-01-01

    This chapter reviews the legislation and rules that provide the foundation for federal regulation of the introduction of natural enemies of insects as biological control agents. It also outlines the steps for complying with regulatory requirements, using biological control of Adelges tsugae Annand, the hemlock woolly adelgid (HWA), as an example. The...

  5. Federal climate change programs : funding history and policy issues

    Science.gov (United States)

    2010-03-01

    In recent years, the federal government has allocated several billion dollars annually for projects to expand the understanding of climate change or to reduce carbon dioxide and other greenhouse-gas (GHG) emissions. Most of that spending is done by t...

  6. The Federal Program in Population Research, Parts 1 and 2.

    Science.gov (United States)

    Federal Council for Science and Technology, Washington, DC.

    The first part of this report characterizes the many facets of the population problem (including biological, economic, and social aspects), suggests a list of areas in which the Federal Government should emphasize research (reproductive biology; fertility regulation techniques and materials; description, determinants, consequences of population…

  7. 75 FR 20314 - Federal Employees Health Benefits Program; Miscellaneous Changes

    Science.gov (United States)

    2010-04-19

    ... employees of the Senate Restaurants after the operations of the Senate Restaurants are contracted to be... business concern to which the Senate Restaurants' food service operations were transferred as described in... continuation of Federal Employees Health Benefits (FEHB) coverage for certain former Senate Restaurant...

  8. 75 FR 76615 - Federal Employees Health Benefits Program Miscellaneous Changes

    Science.gov (United States)

    2010-12-09

    ... employees of the Senate Restaurants after the operations of the Senate Restaurants are contracted to be... which the Senate Restaurants' food service operations were transferred as described in section 1 of... continuation of Federal Employees Health Benefits (FEHB) coverage for certain former Senate Restaurant...

  9. 75 FR 77727 - Federal Acquisition Regulation; HUBZone Program Revisions

    Science.gov (United States)

    2010-12-13

    ... officer. Response: If the contracting officer is notified of possible contractor violations of Federal law...) * * * * * (d)(1) Contractors acting in good faith may rely on written representations by their subcontractors... award of a HUBZone contract, a HUBZone small business concern must be a HUBZone small business concern...

  10. Suggestions for an updated fusion power program

    International Nuclear Information System (INIS)

    Clarke, J.F.

    1976-02-01

    This document contains suggestions for a revised CTR Program strategy which should allow us to achieve equivalent goals while operating within the above constraints. The revised program is designed around three major facilities. The first is an upgrading of the present TFTR facility which will provide a demonstration of the generation of tens of megawatts electric equivalent originally envisioned for the 1985 EPR. The second device is the TTAP which will allow the integration and optimization of the plasma physics results obtained from the next generation of plasma physics experiments. The improvement in tokamak reactor operation resulting from this optimization of fusion plasma performance will enable an EPR to be designed which will produce several hundred megawatts of electric power by 1990. This will move the fusion program much closer to its goal of commercial fusion power by the turn of the century. In addition to this function the TTAP will serve as a prototype of the 1990 EPR system, thus making more certain the successful operation of this device. The third element of this revised program is an intense radiation damage facility which will provide the radiation damage information necessary for the EPR and subsequent fusion reactor facilities. The sum total of experience gained from reacting plasma experiments on TFTR, reactor grade plasma optimization and technological prototyping on TTAP, and end of life radiation damage results from the intense neutron facility will solve all of the presently foreseen problems associated with a tokamak fusion power reactor except those associated with the external nuclear systems. These external system problems such as tritium breeding and optimal power recovery can be developed in parallel on the 1990 EPR

  11. 76 FR 66284 - Wind and Water Power Program

    Science.gov (United States)

    2011-10-26

    ... DEPARTMENT OF ENERGY Office of Energy Efficiency and Renewable Energy Wind and Water Power Program... projects. The 2011 Wind and Water Power Program, Water Power Peer Review Meeting will review the Program's... 2011 Water Power Peer Review Meeting will be held November 1 through November 3, 2011 in Alexandria, VA...

  12. Limitation of releases of radioactive effluents for nuclear power plants in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Tolksdorf, P.; Buehling, A.

    1981-01-01

    Empirical values relating to the effluents of nuclear power plants in the Federal Republic of Germany are now available. These values cover a period of several years of operation. The measured emissions of radioactive substances are often very much below the maximum permissible values, based on the dose limits for the environment stipulated in the legal regulations. Extensive technical and administrative measures contribute to the reduction of radioactive effluents. Furthermore, additional possibilities for improvement are mentioned which may lead to a further reduction of radioactive effluents. These are derived from investigations into the release of radioactive substances in nuclear power plants. The licensing procedure in the Federal Republic of Germany in fixing discharge limits is outlined. Proposals are made concerning licence values which may be determined for the radioactive effluents in modern standardized nuclear power plants with light-water reactors. The resulting radiation exposures are quoted for a typical nuclear power plant site. (author)

  13. Wilberforce Power Technology in Education Program

    Science.gov (United States)

    Gordon, Edward M.; Buffinger, D. R.; Hehemann, D. G.; Breen, M. L.; Raffaelle, R. P.

    1999-01-01

    The Wilberforce Power Technology in Education Program is a multipart program. Three key parts of this program will be described. They are: (1) WISE-The Wilberforce Summer Intensive Experience. This annual offering is an educational program which is designed to provide both background reinforcement and a focus on study skills to give the participants a boost in their academic performance throughout their academic careers. It is offered to entering Wilberforce students. Those students who take advantage of WISE learn to improve important skills which enable them to work at higher levels in mathematics, science and engineering courses throughout their college careers, but most notably in the first year of college study. (2) Apply technology to reaming. This is being done in several ways including creating an electronic chemistry text with hypertext links to a glossary to help the students deal with the large new vocabulary required to describe and understand chemistry. It is also being done by converting lecture materials for the Biochemistry class to PowerPoint format. Technology is also being applied to learning by exploring simulation software of scientific instrumentation. (3) Wilberforce participation in collaborative research with NASA's John H. Glenn Research Center at Lewis Field. This research has focused on two areas in the past year. The first of these is the deposition of solar cell materials. A second area involves the development of polymeric materials for incorporation into thin film batteries.

  14. Nuclear Power Reactor simulator - based training program

    International Nuclear Information System (INIS)

    Abdelwahab, S.A.S.

    2009-01-01

    nuclear power stations will continue playing a major role as an energy source for electric generation and heat production in the world. in this paper, a nuclear power reactor simulator- based training program will be presented . this program is designed to aid in training of the reactor operators about the principles of operation of the plant. also it could help the researchers and the designers to analyze and to estimate the performance of the nuclear reactors and facilitate further studies for selection of the proper controller and its optimization process as it is difficult and time consuming to do all experiments in the real nuclear environment.this program is written in MATLAB code as MATLAB software provides sophisticated tools comparable to those in other software such as visual basic for the creation of graphical user interface (GUI). moreover MATLAB is available for all major operating systems. the used SIMULINK reactor model for the nuclear reactor can be used to model different types by adopting appropriate parameters. the model of each component of the reactor is based on physical laws rather than the use of look up tables or curve fitting.this simulation based training program will improve acquisition and retention knowledge also trainee will learn faster and will have better attitude

  15. Concrete Technology program for nuclear power plants

    International Nuclear Information System (INIS)

    Hassazadeh, M.; Wrangensten, L.

    2009-01-01

    The nuclear power plants in Sweden and Finland were built during the seventies/eighties and it is planned to extend their service life and increase their production capacity. The challenges are now to assess the condition of the concrete structures; to verify whether or not the structures can withstand the prescribed loads and functions; and verify if the structures can be upgraded in order to fulfil the requirements regarding load bearing and functional capacity. A research program was launched whose priority is condition assessment of the reactor containment. The research includes condition of the pre-stressing reinforcement, reinforcement bars, lining, leakage etc. The conditions are assessed both by destructive and non-destructive test methods. The addressed properties are physical, mechanical, electro-chemical and geometrical. The paper presents the organisation of the program, the co-operating partners, the research program, and the content of the on-going and planned research projects

  16. Federal NOx Budget Trading Program and CAIR NOx and SO2 Trading Programs (40 CFR Part 97)

    Science.gov (United States)

    This part establishes general provisions and the applicability, permitting, allowance, excess emissions, monitoring, and opt-in provisions for the federal NOx Budget Trading Program as a means of mitigating interstate transport of ozone and nitrogen oxides

  17. 78 FR 73702 - Federal Travel Regulation (FTR); Telework Travel Expenses Test Programs

    Science.gov (United States)

    2013-12-09

    ...; Docket Number 2013-0012, Sequence 1] RIN 3090-AJ23 Federal Travel Regulation (FTR); Telework Travel...). ACTION: Final rule. SUMMARY: GSA is amending the Federal Travel Regulation (FTR) to incorporate the Telework Enhancement Act of 2010, which establishes and authorizes telework travel expenses test programs...

  18. 77 FR 43127 - Federal Employees Health Benefits Program: Medically Underserved Areas for 2013

    Science.gov (United States)

    2012-07-23

    ... OFFICE OF PERSONNEL MANAGEMENT Federal Employees Health Benefits Program: Medically Underserved... determination of the States that qualify as Medically Underserved Areas under the Federal Employees Health... law that mandates special consideration for enrollees of certain FEHB plans who receive covered health...

  19. 78 FR 50119 - Federal Employees Health Benefits Program: Medically Underserved Areas for 2014

    Science.gov (United States)

    2013-08-16

    ... OFFICE OF PERSONNEL MANAGEMENT Federal Employees Health Benefits Program: Medically Underserved... determination of the states that qualify as Medically Underserved Areas under the Federal Employees Health... law that mandates special consideration for enrollees of certain FEHB plans who receive covered health...

  20. 77 FR 12913 - Federal Acquisition Regulation; Women-Owned Small Business (WOSB) Program

    Science.gov (United States)

    2012-03-02

    ... 2010-015; Item I; Docket 2010-0015, Sequence 1] RIN 9000-AL97 Federal Acquisition Regulation; Women... Regulation (FAR) to implement the Small Business Administration's regulations establishing the Women-Owned Small Business (WOSB) Program. This rule authorizes the restriction of competition for Federal contracts...

  1. 76 FR 59256 - Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal...

    Science.gov (United States)

    2011-09-26

    ...; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal Year 2012; Changes in Size... [CMS-1349-CN] RIN 0938-AQ28 Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal Year 2012; Changes in Size and Square Footage of Inpatient Rehabilitation Units...

  2. Chapter 15: Economic analysis of federal wildfire management programs

    Science.gov (United States)

    Krista M. Gebert; David E. Calkin; Robert J. Huggett; Karen L. Abt

    2008-01-01

    In the past two decades, there has been a significant increase in the number of acres burned by wildland fires and in the amount of money being spent to suppress these fires (Calkin et al. 2005a). With expenditures on suppression alone climbing to more than a billion dollars in four of the past seven years (2000-2006), the federal land management agencies are coming...

  3. 78 FR 60169 - Federal Acquisition Regulation; Pilot Program for Enhancement of Contractor Employee...

    Science.gov (United States)

    2013-09-30

    ... 9000-AM56 Federal Acquisition Regulation; Pilot Program for Enhancement of Contractor Employee... program enhancing whistleblower protections for contractor employees. DATES: Effective: September 30, 2013... contractor employees at FAR subpart 3.9. The pilot program is mandated by section 828, entitled ``Pilot...

  4. Human resources in nuclear power program

    International Nuclear Information System (INIS)

    Machi, Sueo

    2008-01-01

    Nuclear power utilization within 2020 horizon is expanding in Asia, particularly in Japan, China, India, Republic of Korea, Vietnam and Indonesia. The nuclear energy policy iof Japan sees the increase of nuclear power contribution for energy security and to control CO 2 emission with the contribution ratio through the 21 st century kept at the current level of 30-40% or even higher. Japan expects its first reprocessing plant to be operational in 2007 and its first commercial fast breeder reactor operational in 2050. Starting with her experience with the operation of its first research reactor in 1957, a power demonstration reactor from USA in 1963; the first commercial 166 MW power plant from UK in 1966 and then its first commercial 375 MW light water reactor from USA in 1970, Japan developed her own nuclear reactor technology. Today, Japan has 55 operating nuclear power plants (NPPs) totaling 49 GW which supply 30% of its electricity needs. There are two NPPs under construction and 11 additional NPPs to be completed by 2017. Japan's experience showed that engineers in the nuclear, mechanical, electrical, material and chemical fields are needed to man their nuclear power plant. For the period 1958 to about 1970, there was a rapid increase in the number of students enrolled for their bachelor of science majoring in nuclear science and technology but this number of enrollees leveled off beyond 1970 up to 2002. For those pursuing their masters of science degree in this field, there was a steady but moderate rise in the number of students from 1958 to 2002. The population of students in the Ph.D program in nuclear science and technology had the lowest number of enrollees and lowest level of increase from 1958 to 2002. The courses offered at the university for nuclear power are nuclear reactor physics and engineering, nuclear reactor safety engineering and radiation safety. Prior to graduation, the students undergo training at a nuclear research institute, nuclear power

  5. Federal Spending for Means Tested Programs, 2007 to 2027

    Science.gov (United States)

    2017-02-01

    child tax credits (which are refundable), the Supplemental Nutrition Assistance Program (SNAP), and Supplemental Security Income. The largest non...child tax credits, and SNAP—have been or will be significantly affected by program changes that unfold over time: B Medicaid spending rose by 35...total outlays in the Part D program). Increases in the number of beneficiaries account for about one- third of that growth; the introduction of new

  6. Federal Administrative Court, judgement of December 17, 1986 (nuclear power station at international border)

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    In its decision of December 17, 1986, the Federal Administrative Court accepted the right of action of Dutch borderers against an atomic licence for a German nuclear power plant. The necessary involvement according to sec. 42 Paragraph 2 of the Administrative Court Procedure Act results from the violation of the third party protection provision in sec. 7 Atomic Energy Act. (WG) [de

  7. A generic model for evaluation of the Federal Aviation Administration air traffic control specialist training programs.

    Science.gov (United States)

    1982-03-01

    The Systems Analysis Research Unit at the Civil Aeromedical Institute (CAMI) has developed a generic model for Federal Aviation Administration (FAA) Academy training program evaluation. The model will serve as a basis for integrating the total data b...

  8. The role of the states in a federal climate program : issues and options

    Science.gov (United States)

    2009-11-01

    This paper provides an overview of some of the key isuses regarding statefederal roles in a federal climate program and identifies four possible mechanisms that have been suggested for allowing states to set more stringent reduction targets. *Cont...

  9. Trustworthy Cyberspace: Strategic Plan for the Federal Cybersecurity Research and Development Program

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — Trustworthy Cyberspace: Strategic Plan for the Federal Cybersecurity Research and Development Program defines a set of interrelated priorities for the agencies of...

  10. Electronic Health Record Vendors Reported by Health Care Providers Participating in Federal EHR Incentive Programs

    Data.gov (United States)

    U.S. Department of Health & Human Services — This public use file combines registration data compiled from two federal programs that are on-going since February 2009 – the Centers for Medicare & Medicaid...

  11. VA Dental Insurance Program--federalism. Direct final rule.

    Science.gov (United States)

    2013-10-22

    The Department of Veterans Affairs (VA) is taking direct final action to amend its regulations related to the VA Dental Insurance Program (VADIP), a pilot program to offer premium-based dental insurance to enrolled veterans and certain survivors and dependents of veterans. Specifically, this rule will add language to clarify the limited preemptive effect of certain criteria in the VADIP regulations.

  12. Romanian nuclear power program - status and trends

    International Nuclear Information System (INIS)

    Chirica, T.; Condu, M.; Bilegan, I.C.; Glodeanu, F.; Popescu, D.

    1997-01-01

    The paper presents the status and the forecast for the Romanian Nuclear Power Program, as a component of the national strategy of power sector in Romania. The successful commissioning and operation of Cernavoda NPP - Unit 1 consolidated the opinion to go further for completion of Unit 2 to 5 on Cernavoda site. The focus is now on Unit 2, planned to be commissioned in 2001, and on the related projects for radioactive waste treatment and disposal. The Romanian national infrastructure supporting this program is also presented, including the research and development facilities. Romanian nuclear industry represents today one of the most advanced sector in engineering and technology and has the ability to meet the requirements of international codes and standards, proving also excellent quality assurance skills. Romanian nuclear industry has also the capability to compete on third market, for nuclear projects, together with the traditional suppliers. The conclusion of the paper is that for Romania, the nuclear energy is the best solution for future development of power sector, is safe, economic, and ethical. Nuclear sector created in Romania new jobs and activities contributing to the progress of Romanian society. (authors)

  13. Romanian nuclear power program - status and trends

    International Nuclear Information System (INIS)

    Chirica, T.; Condu, M.; Stiopol, M.; Bilegan, I. C.; Glodeanu, F.; Popescu, D.

    1997-01-01

    This paper presents the status and the forecast for the Romanian Nuclear Power Program, as a component of the national strategy of power sector in Romania. The successful commissioning and operation of Cernavoda NPP - Unit 1 consolidated the opinion to go further for completion of Unit 2 to 5 on Cernavoda site. The focus is now on Unit 2, planed to be commissioned in 2001, and on the related projects for radioactive waste treatment and disposal. The Romanian national infrastructure supporting this program is also presented, including the research and development facilities. Romanian nuclear industry represent today one of the most advanced sector in engineering and technology and has the ability to meet the requirements of international codes and standards, proving also excellent quality assurance skills. Romanian nuclear industry has also the capability to compete on third markets, for nuclear projects, together with the traditional suppliers. The conclusion of the paper is that for Romania the nuclear energy is the best solution for future development of power sector, is safe, economic and ethical. Nuclear sector created in Romania new jobs and activities, contributing to the progress of Romanian society. (author). 5 refs

  14. Financial and economic problems of nuclear power in the Russian Federation

    International Nuclear Information System (INIS)

    Ignatenko, Evgeny I.; Trunov, Vladimir M.; Dyakonov, Evgeny I.; Sharov, Evgeny I.

    1998-01-01

    The nuclear power plants of Russia operating in the base-loading mode guarantee the stability of electric power generation and in fact make notable contribution to ensuring the power security of the state. NPPs raise power generation and improve safety parameters successfully competing with the most cost efficient fossil fuel TPP's existing at the Federal Wholesale Market of Power and Generation Capacity (FOREM). However, the FOREM which is being established under the hospices of the RSC 'IPS of Russia' has a number of significant deficiencies. As the result of that the nuclear power does not have the possibility to make use of the Cost-efficient and essential effect of the NPPs operation within the structure of the IPS of Russia. In reality this effect is redistributed to the advantage of low-efficiency electric power producers at the federal and regional levels. Under these circumstances people employed in the nuclear power sector are seeking different ways out from the crisis of non-payments in order to overcome the deficiencies existing at the market of power and capacity, namely: introduction at the FOREM of the settlement procedures through transit accounts; concluding contracts between the nuclear power plants and the concern with the direct (priority) payers; approval of tariffs for the transmission of the electric power through the lines of the RSC 'IPS of Russia' and 'AO-energo' with the purpose of concluding direct contracts with the end users; preservation of the investment component in the production cost of the NPPs commercial output up to 2000; establishment of a nuclear power generating company and etc. (author)

  15. Licensing and regulatory control of nuclear power plants in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Obenhaus, W.

    1977-01-01

    The lecture is divided into three parts: 1) the legal conception and requirements of the German Atomic Energy Law (with special view on construction and operation of nuclear power plants), 2) the role of the Federation ('Bund') and the 'Laender' in the field of atomic energy and the Radiation Protection Ordinance (especially for licensing and supervision of nuclear power plants), 3) the function, participants, types and sequence of the strongly formalised licensing procedure for nuclear power plants, technical assessment in the frame of this procedure, content of a licence, possibility for altering the licence at a later date, role of administrative courts, continual supervision. (orig./HP) [de

  16. Duke Power Company's control rod wear program

    International Nuclear Information System (INIS)

    Culp, D.C.; Kitlan, M.S. Jr.

    1990-01-01

    Recent examinations performed at several foreign and domestic pressurized water reactors have identified significant control rod cladding wear, leading to the conclusion that previously believed control rod lifetimes are not attainable. To monitor control rod performance and reduce safety concerns associated with wear, Duke Power Company has developed a comprehensive control rod wear program for Ag-In-Cd and boron carbide (B 4 C) rods at the McGuire and Catawba nuclear stations. Duke Power currently uses the Westinghouse 17 x 17 Ag-In-Cd control rod design at McGuire Unit 1 and the Westinghouse 17 x 17 hybrid B 4 C control rod design with a Ag-In-Cd tip at McGuire Unit 2 and Catawba Units 1 and 2. The designs are similar, with the exception of the absorber material and clad thickness. There are 53 control rods per unit

  17. Super Energy Savings Performance Contracts: Federal Energy Management Program (FEMP) Program Overview (revision)

    International Nuclear Information System (INIS)

    Pitchford, P.

    2001-01-01

    This four-page publication describes the U.S. Department of Energy's (DOE's) streamlined energy savings performance contracting, or ''Super ESPC,'' process, which is managed by DOE's Federal Energy Management Program (FEMP). Under a Super ESPC, a qualifying energy service company (ESCO) from the private sector pays for energy efficiency improvements or advanced renewable energy technologies (e.g., photovoltaic systems, wind turbines, or geothermal heat pumps, among others) for a facility of a government agency. The ESCO is then repaid over time from the agency's resulting energy cost savings. Delivery orders under these contracts specify the level of performance (energy savings) and the repayment schedule; the contract term can be up to 25 years, although many Super ESPCs are for about 10 years or less

  18. Historic low-level radioactive waste federal policies, programs and oversight

    International Nuclear Information System (INIS)

    Blanchette, M.; Kenney, J.; Zelmer, B.

    2011-01-01

    'Full text:' The management of radioactive waste is one of the most serious environmental problems facing Canadians. From the early industrial uses of radioactive material in the 1930s to the development of nuclear power reactors and the medical and experimental use of radio-isotopes today, there has been a steady accumulation of waste products. Historic waste is low-level radioactive waste for which the federal government has accepted responsibility for long-term management. This paper will outline the policy framework used to govern institutional and financial arrangements for the disposal of radioactive waste by waste producers and owners and the major radioactive projects in which the Government of Canada is currently involved. It will provide an overview of the organizations established for the management of historic radioactive waste and NRCan's oversight role. Finally, an overview of the historic waste program activities managed on behalf of the federal government through these organizations in the Port Hope area, the Greater Toronto Area, in Fort McMurray, Alberta and along the Northern Transportation Route is provided. Canada's Policy Framework for Radioactive Waste, sets out principles that govern the institutional and financial arrangements for disposal of radioactive waste by waste producers and owners. According to the Policy Framework: The federal government will ensure that radioactive waste disposal is carried out in a safe, environmentally sound, comprehensive, cost-effective and integrated manner; The federal government has the responsibility to develop policy, to regulate, and to oversee producers and owners; and, The waste producers and owners are responsible, in accordance with the principle of 'polluter pays', for the funding, organization, management and operation of disposal and other facilities required for their wastes. Arrangements may be different for nuclear fuel waste, low-level radioactive waste and

  19. Federal Aviation Administration Curriculum Guide for Aviation Magnet Schools Programs

    Science.gov (United States)

    1994-01-01

    Prepared ca. 1994. This publication is designed to provide: : - a brief history of the role of aviation in motivating young : people to learn. : - examples of aviation magnet activities, programs, projects and : school curriculums. : - documentation ...

  20. Federal Aviation Administration's behavioral research program for defense against hijackings.

    Science.gov (United States)

    Dailey, J T; Pickrel, E W

    1975-04-01

    Behavioral research has been significant contributions to the government's successful program for defense against hijackers. Today's boarding gate defenses have a leading role in that program, but they were rejected until creation of the behavioral profile made selective search feasible. Metal detectors now make search of all travelers practical but with increasing involvement of boarding gate employees, so a behavioral program is used to monitor their performance. Experience shows that some persons have penetrated boarding gate defenses, so another requirement was in-flight defenses. Flightpersonnel had defeated some past hijackers, so a behavioral analysis of past hijackings was used to identify tactics for in-flight defense. These were incorporated into training programs and distributed to all U.S. airlines, many government organizations, and foreign carriers. Research continues for updating these and developing new courses for special needs, such as defense against gangs.

  1. Federal Tax Issues Raised by International Study Abroad Programs.

    Science.gov (United States)

    Harding, Bertrand M., Jr.

    2000-01-01

    Identifies and describes tax issues raised by study abroad programs and suggests steps that a college or university can take to minimize or eliminate adverse U.S. and foreign tax exposure to both itself and its employees. (EV)

  2. Results and tasks of the implementation of federal target programs aimed at overcoming the consequences of radiation accidents and catastrophes in the Russian Federation

    International Nuclear Information System (INIS)

    Gerasimova, N.V.

    2002-01-01

    Major results are presented on the implementation of federal target programs on overcoming the consequences of the accident at the Chernobyl nuclear power plant, radiation accidents and incidents at the 'Mayak' Industrial Association, nuclear tests at the Semipalatinsk test site in the period of 1992-2000. The status of the standards and legislation regulating the activities aimed at population protection and rehabilitation of territories is analyzed. The current state of the problem is evaluated. The proposals are laid down for major directions of the state policy of the Russian Federation in overcoming the consequences of radiation accidents for the period until 2010, and the outlook for the efforts in the above domain and the above period is given. About 130 thousand square kilometers of the territories of 20 Russian Federation subjects with a population of around 4 million people were affected by accidents at nuclear fuel cycle sites/facilities, and nuclear and hydrogen weapons tests. The accidents entailed a host of grave radioecological, medical, demographic, and socio-economic consequences, exerted a significant unfavorable impact upon the socio-economic development of the affected territories. (author)

  3. Internal Dosimetry for Nuclear Power Program

    International Nuclear Information System (INIS)

    Wo, Y.M.

    2011-01-01

    Internal dosimetry which refers to dosage estimation from internal part of an individual body is an important and compulsory component in order to ensure the safety of the personnel involved in operational of a Nuclear Power Program. Radionuclides particle may deposit in the human being through several pathways and release wave and/or particle radiation to irradiate that person and give dose to body until it been excreted or completely decayed from the body. Type of radionuclides of concerning, monitoring program, equipment's and technique used to measure the concentration level of such radionuclides and dose calculation will be discussed in this article along with the role and capability of Malaysian Nuclear Agency. (author)

  4. Federal tax effects on the financial attractiveness of renewable versus conventional power plants

    International Nuclear Information System (INIS)

    Hill, L.J.; Hadley, S.W.

    1995-01-01

    In this paper, we examine the effects of federal tax laws on the financial attractiveness of seven renewable and four conventional electric power generating technologies adopted by investor owned utilities (IOUs) and non-utility electricity generators (NUGs). The results show that federal income tax laws applicable to renewable generating technologies generally provide very attractive financial incentives for the adoption of these technologies by IOUs and NUGs. If an IOU and NUG is subject to the alternative minimum tax, however, it may not be able to take full advantage of these financial incentives. (author)

  5. 77 FR 38277 - Wind and Water Power Program

    Science.gov (United States)

    2012-06-27

    ... DEPARTMENT OF ENERGY Office of Energy Efficiency and Renewable Energy Wind and Water Power Program... public meeting. SUMMARY: The Department of Energy (DOE) Wind and Water Power Program is planning a... in Washington, DC on June 13, 2012. Mark Higgins, Wind and Water Power Acting Program Manager, Office...

  6. Federal Republic of Germany/backfilling and sealing program - outline

    International Nuclear Information System (INIS)

    Kappei, G.

    1986-01-01

    After 1978 the Asse salt mine was used exclusively for research work which serves to make available scientific and technical data for the planning, construction and operation of repositories for radioactive wastes. This presentation delineates the advantages of the geological formation rock salt with a view to the final disposal of radioactive wastes subsequent to a short description of the 'Waste Management Concept' of the Federal Republic of Germany. The individual components of the internationally accepted 'Multiple Barrier System' are described, while the technical barriers 'backfilling and sealing' are subject of special consideration. A general formulation of the requirements and objectives of each specific component in the backfilling and sealing system is presented. (orig./DG)

  7. 77 FR 31839 - Wind and Water Power Program

    Science.gov (United States)

    2012-05-30

    ... DEPARTMENT OF ENERGY Office of Energy Efficiency and Renewable Energy Wind and Water Power Program... projects. The 2012 Wind and Water Power Program, Wind Power Peer Review Meeting will review wind technology... portfolio. The 2012 Wind Power Peer Review Meeting will be held June 19 through June 21, 2012, in Alexandria...

  8. The legal framework for nuclear power stations in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Schmidt-Preuss, M.

    2008-01-01

    Within the range of the power generation the part of nuclear energy amounts 22 % in Germany in the year 2007. The author of the contribution under consideration describes the legal framework for nuclear power stations in the Federal Republic of Germany. The following aspects are described: (a) The atomic law and the completion of the power generation from nuclear energy; (b) The disposal of nuclear wastes; (c) The Euratom contract; (d) The institutional framework for the execution of the atomic energy law; (e) Legal protection opposite atom legal sovereignty documents; (f) future of the atomic law; (g) European Union-Russian partnership agreement and cooperation agreement. In order to guarantee a sustainable power supply for the production of goods and services in a national economy, also the legal framework for nuclear power stations in Germany must be realized

  9. Advertising the atom: federal promotion of nuclear power, 1953-1984

    Energy Technology Data Exchange (ETDEWEB)

    Smith, M.

    1984-01-01

    The public relations strategies of the Atomic Energy Commission (AEC) and the nuclear power industry reveal both public and official perceptions of nuclear power and the social uses of technology in general during the first 15 years after passage of the Atomic Energy Act of 1954. The relation between nuclear promotion and regulation also helps explain the environmental crisis of the 1969-1984 years. Project Plowshare coincides roughly with the early promotional years, and provides a case study of the relation of regulatory standards to promotion in AEC policymaking. The author examines the environmentalists challenge to nuclear power that emerged in 1969 alongside government and industry response. He concludes with an assessment of the present state of federal nuclear power policy and of the nuclear power industry.

  10. Advertising the atom: federal promotion of nuclear power, 1953-1984

    International Nuclear Information System (INIS)

    Smith, M.

    1984-01-01

    The public relations strategies of the Atomic Energy Commission (AEC) and the nuclear power industry reveal both public and official perceptions of nuclear power and the social uses of technology in general during the first 15 years after passage of the Atomic Energy Act of 1954. The relation between nuclear promotion and regulation also helps explain the environmental crisis of the 1969-1984 years. Project Plowshare coincides roughly with the early promotional years, and provides a case study of the relation of regulatory standards to promotion in AEC policymaking. The author examines the environmentalists challenge to nuclear power that emerged in 1969 alongside government and industry response. He concludes with an assessment of the present state of federal nuclear power policy and of the nuclear power industry

  11. 5 CFR 792.216 - Are Federal employees with children who are enrolled in summer programs and part-time programs...

    Science.gov (United States)

    2010-01-01

    ... are enrolled in summer programs and part-time programs eligible for the child care subsidy program... summer programs and part-time programs eligible for the child care subsidy program? Federal employees... enrolled in daytime summer programs and part-time programs such as before and after school programs are...

  12. Federal Administrative Court dismisses action of a nuclear power opponent against Grafenrheinfeld nuclear power plant

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    With its decision of April 30, 1980 - BVerwG 7 C 88.79-, the Federal Administrative Court has dismissed an appeal against the decision of the Bavarian Administrative Court, in which the plaintiff's action had been dismissed. The cost of the appeal suit will be paid by the plaintiff. The value in litigation was set at DM 20,000 for the appeal proceedings. The grounds for the decision are given in full wording. (orig./HP) [de

  13. 38 CFR 41.525 - Criteria for Federal program risk.

    Science.gov (United States)

    2010-07-01

    ... control structures may have higher risk. When assessing risk in a large single audit, the auditor shall... also indicate risk. (2) Prior audit findings would indicate higher risk, particularly when the... program risk. 41.525 Section 41.525 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS...

  14. Federal Program Encourages Health Service Innovations on Developmental Disabilities

    Science.gov (United States)

    Nix, Mary P.

    2009-01-01

    There is always room for improvement in the delivery of health services. This article discusses the U.S. Agency for Healthcare Research and Quality's (AHRQ) Health Care Innovations Exchange (www.innovations.ahrq.gov), a comprehensive program that aims to increase awareness of innovative strategies to meet health service delivery challenges and…

  15. Federal Financial and Economic Literacy Education Programs, 2009

    Science.gov (United States)

    Hung, Angela A.; Mihaly, Kata; Yoong, Joanne K.

    2010-01-01

    Financial literacy--the ability to use knowledge and skills to manage financial resources effectively for a lifetime of financial well-being--is becoming more and more important as individuals and families become increasingly responsible for their own long-term financial well-being. Financial and economic literacy education programs have been…

  16. Fifth annual report to congress. Federal alternative motor fuels programs

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    This report presents the status of the US Department of Energy`s alternative fuel vehicle demonstration and performance tracking programs being conducted in accordance with the Energy Policy and Conservation Act. These programs comprise the most comprehensive data collection effort ever undertaken on alternative transportation fuels and alternative fuel vehicles. The report summarizes tests and results from the fifth year. Electric vehicles are not included in these programs, and the annual report does not include information on them. Since the inception of the programs, great strides have been made in developing commercially viable alternative fuel vehicle technologies. However, as is the case in the commercialization of all new technologies, some performance problems have been experienced on vehicles involved in early demonstration efforts. Substantial improvements have been recorded in vehicle practicality, safety, and performance in real-world demonstrations. An aspect of particular interest is emissions output. Results from light duty alternative fuel vehicles have demonstrated superior inservice emissions performance. Heavy duty alternative fuel vehicles have demonstrated dramatic reductions in particulate emissions. However, emissions results from vehicles converted to run on alternative fuel have not been as promising. Although the technologies available today are commercially viable in some markets, further improvements in infrastructure and economics will result in greater market expansion. Information is included in this report on light and heavy duty vehicles, transit buses, vehicle conversions, safety, infrastructure support, vehicle availability, and information dissemination.

  17. Federal Aviation Administration weather program to improve aviation safety

    Science.gov (United States)

    Wedan, R. W.

    1983-01-01

    The implementation of the National Airspace System (NAS) will improve safety services to aviation. These services include collision avoidance, improved landing systems and better weather data acquisition and dissemination. The program to improve the quality of weather information includes the following: Radar Remote Weather Display System; Flight Service Automation System; Automatic Weather Observation System; Center Weather Processor, and Next Generation Weather Radar Development.

  18. ACHP | Federal Emergency Management Agency Historic Preservation Program

    Science.gov (United States)

    /ehp/hp/fema386-6.shtm FEMA's Historic Preservation Policies and Guidance: http://www.fema.gov /environmental-planning-and-historic-preservation-program/femas-historic-preservation-policies Homeowner Flood Insurance Affordability Act: http://www.fema.gov/media-library/assets/documents/93074 Updated February 8

  19. THE AFFORDABLE CARE ACT AND INCENTIVIZED HEALTH WELLNESS PROGRAMS--A TALE OF FEDERALISM AND SHIFTING ADMINISTRATIVE BURDEN.

    Science.gov (United States)

    Sirpal, Sanjeev

    2014-01-01

    The Patient Protection and Affordable Care Act creates new incentives and builds on existing wellness program policies to promote employer wellness programs and encourage opportunities to support healthier workplaces. The proposed rules are promulgated by the Department of Health and Human Services (HHS), the Department of Labor, and the Treasury Department, and seek to encourage appropriately designed, consumer-protective wellness programs in group health coverage. This legislative landscape raises significant federalism concerns insofar as it largely shifts the responsibility for administration of health incentive programs to the states. Little attention has been paid to the shifting "administrative burden" that would thereby ensue. This paper will address the distribution of power in the American federal system vis-à-vis subnational counterparts in the wake of rampant, recent health care reform efforts. This paper will therefore explore the willingness of the national government to delegate policymaking responsibility to state governments in the context of an important aspect of healthcare reform. This, in turn, can be used to assess the distribution of powers between governmental levels--a subject that has received little systematic inquiry to date. Finally, this paper will explore the degree of administrative burden shifting that may likely occur as a result of these changes in health reform and what potential impacts it may have on individual health.

  20. 75 FR 57145 - Federal-State Unemployment Compensation Program; Funding Goals for Interest-Free Advances

    Science.gov (United States)

    2010-09-17

    ... Unemployment Compensation Program; Funding Goals for Interest-Free Advances; Final Rule #0;#0;Federal Register... Unemployment Compensation Program; Funding Goals for Interest-Free Advances AGENCY: Employment and Training... unemployment compensation (UC) upon the State meeting ``funding goals, established under regulations issued by...

  1. 78 FR 31552 - Federal Acquisition Regulation; Submission for OMB Review; Make-or-Buy Program

    Science.gov (United States)

    2013-05-24

    ... socio-economic policies may be affected by make-or-buy decisions under certain Government prime...; Submission for OMB Review; Make- or-Buy Program AGENCIES: Department of Defense (DOD), General Services... collection requirement concerning the Make-or-Buy Program. A notice was published in the Federal Register at...

  2. The Rise of International Relations Programs in the Brazilian Federal Universities: Curriculum Specificities and Current Challenges

    Science.gov (United States)

    Ferreira, Marcos Alan S. V.

    2016-01-01

    The aim of this reflection is to study the new international relations (IR) programs introduced by Brazilian federal universities, looking comparatively at their curriculum specificities and current challenges. In recent years, Brazil has seen an increase of IR programs launched in several regions. Since 2003, the Ministry of Education is in the…

  3. Bohunice Nuclear Power Plant Safety Upgrading Program

    International Nuclear Information System (INIS)

    Toth, A.; Fagula, L.

    1996-01-01

    Bohunice nuclear Power Plant generation represents almost 50% of the Slovak republic electric power production. Due to such high level of commitment to nuclear power in the power generation system, a special attention is given to safe and reliable operation of NPPs. Safety upgrading and operational reliability improvement of Bohunice V-1 NPP was carried out by the Bohunice staff continuously since the plant commissioning. In the 1990 - 1993 period extensive projects were realised. As a result of 'Small Reconstruction of the Bohunice V-1 NPP', the standards of both the nuclear safety and operational reliability have been significantly improved. The implementation of another modifications that will take place gradually during extended refuelling outages and overhauls in the course of 1996 through 1999, is referred to as the Gradual Reconstruction of the Bohunice V-1 Plant. The general goal of the V-1 NPP safety upgrading is the achievement of internationally acceptable level of nuclear safety. Extensive and financially demanding modification process of Bohunice V-2 NPP is likely to be implemented after a completion of the Gradual Reconstruction of the Bohunice V-1 NPP, since the year 1999. With this in mind, a first draft of the strategy of the Bohunice V-2 NPP upgrading program based on Probabilistic Safety assessment consideration was developed. A number of actions with a general effect on Bohunice site safety is evident. All these activities are aimed at reaching the essential objective of Bohunice NPP Management - to ensure a safe, reliable and effective electric energy and heat generation at the Bohunice site. (author)

  4. Coordination of Programs on Domestic Animal Genomics: The Federal Framework

    Science.gov (United States)

    2004-06-01

    programs, especially for dairy and beef cattle, layer and broiler chickens, and swine. As DNA-based technologies were developed in the 1970s and 1980s...Wellcome Trust in Great Britain, has created a map of genetic variation for three different strains of domestic chickens. The strains were a broiler strain...present the biggest problem as the status of asymptotic carriers may not be suspected until several litters have been produced. This includes diseases

  5. 5 CFR 792.217 - Are part-time Federal employees eligible for the child care subsidy program?

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Are part-time Federal employees eligible... the Child Care Subsidy Program Legislation and to Whom Does It Apply? § 792.217 Are part-time Federal employees eligible for the child care subsidy program? Federal employees who work part-time are eligible for...

  6. The safety analysis report for nuclear power plants in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Kohler, H.A.G.

    1976-01-01

    On the basis of the standard format for drawing up safety analysis reports for stationary fission reactors - this format was published in 1959 by the competent Federal Ministry for Atomic Energy - a report is made on the format and scope of German safety analysis reports. The reasons for drawing up a standard safety analysis report for nuclear power plants with pressurized water reactor or boiling water reactor and a KWU draft are discussed. (orig./RW) [de

  7. Decision of the Swiss Federal Council of 22 August 1979 (nuclear power station Leibstadt)

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    On the occasion of an appeal in administrative matters, launched by private persons domiciled in the Federal Republic of Germany against two part-construction permits for the Leibstadt nuclear power plant, the Swiss Bundesrat decided that these private persons do have the right to launch an appeal, in accordance with section 48 a of the Rules of administrative proceedings. The appeal may, however, only be based on infringement of rights protected by Swiss national law. (HP) [de

  8. The design of nuclear power plants in the Federal Republic of Germany as regards aircraft accidents

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    On the basis of investigation results of aircraft crashes for the Federal territory and site assessment data of the Ministry of the Interior, air traffic does not present a notable hazard for a nuclear power plant. As a precautionary measure for reducing the remaining risk, design requirements for LWRs were developed which, independently of existing aircraft types, contain mainly an abstract predetermination of an idealized impact load - time diagramme. (HP) [de

  9. Developing solar power programs : San Francisco's experience

    International Nuclear Information System (INIS)

    Schwartz, F.

    2006-01-01

    This keynote address discussed an array of solar programs initiated in government-owned buildings in San Francisco. The programs were strongly supported by the city's mayor,and the voting public. Known for its fog and varying microclimates, 11 monitoring stations were set up throughout the city to determine viable locations for the successful application of solar technologies. It was observed that 90 per cent of the available sunshine occurred in the central valley, whereas fog along the Pacific shore was problematic. Seven of the monitoring sites showed excellent results. Relationships with various city departments were described, as well as details of study loads, load profiles, electrical systems, roofs and the structural capabilities of the selected government buildings. There was a focus on developing good relations with the local utility. The Moscone Convention Center was selected for the program's flagship installation, a 675 kW solar project which eventually won the US EPA Green Power Award for 2004 and received high press coverage. Cost of the project was $4.2 million. 825,000 kWh solar electricity was generated, along with 4,500,000 kWh electricity saved annually from efficiency measures, resulting in a net reduction of 5,325,000 kWh. Savings on utilities bills for the center were an estimated $1,078,000. A pipeline of solar projects followed, with installations at a sewage treatment plant and a large recycling depot. A program of smaller sites included libraries, schools and health facilities. Details of plans to apply solar technology to a 500 acre redevelopment site in southeast San Francisco with an aging and inadequate electrical infrastructure were described. A model of efficient solar housing for the development was presented, with details of insulation, windows, heating ventilation and air-conditioning (HVAC), water heating, lighting, appliances and a 1.2 kilowatt solar system. Peak demand reductions were also presented. tabs., figs

  10. Federalism, entitlements, and discretionary grants: the fiscal context of national support for immunization programs.

    Science.gov (United States)

    Miller, V J

    2000-10-01

    This paper defines the appropriation and resource allocation structure of federal government programs that deliver vaccines to the public through state and local governments, with a special focus on the Centers for Disease Control and Prevention (CDC) Section 317 program. The paper places these programs in the context of the overall intergovernmental finance system of the United States, and the manner in which that system has responded to societal changes in other areas, such as unemployment insurance and environmental protection. The paper concludes that a changing environment for vaccine financing, and uncertain appropriations for state government immunization infrastructure, may have made the current CDC Section 317 program inadequate. Increased entitlement resources for federally funded vaccines have not been matched with increased and stable resources for the balance of program costs. To the contrary, funding provided to the Section 317 program has proven unstable, and its discretionary appropriations have proven vulnerable to both executive and legislative branch earmarking for such activities as overseas disease eradication or home state earmarking by congressional appropriations subcommittee members. In addition, the rigidity of some CDC program requirements makes it difficult for states to effectively use program funds. Consideration should be given to strengthening the Section 317 program and its relationships to other federal aid programs to ensure that adequate immunization protections are provided in all states to adequately protect all citizens.

  11. Federally Funded Programs Related to Building Energy Use: Overlaps, Challenges, and Opportunities for Collaboration

    Energy Technology Data Exchange (ETDEWEB)

    Cort, Katherine A.; Butner, Ryan S.; Hostick, Donna J.

    2010-10-01

    As energy efficiency in buildings continues to move from discreet technology development to an integrated systems approach, the need to understand and integrate complementary goals and targets becomes more pronounced. Whether within Department of Energy’s (DOE) Building Technologies Program (BTP), across the Office of Energy Efficiency and Renewable Energy (EERE), or throughout DOE and the Federal government, mutual gains and collaboration synergies exist that are not easily achieved because of organizational and time constraints. There also cases where federal agencies may be addressing similar issues, but with different (and sometimes conflicting) outcomes in mind. This report conducts a comprehensive inventory across all EERE and other relevant Federal agencies of potential activities with synergistic benefits. A taxonomy of activities with potential interdependencies is presented. The report identifies a number of federal program objectives, products, and plans related to building energy efficiency and characterizes the current structure and interactions related to these plans and programs. Areas where overlap occurs are identified as are the challenges of addressing issues related to overlapping goals and programs. Based on the input gathered from various sources, including 20 separate interviews with federal agency staff and contractor staff supporting buildings programs, this study identifies a number of synergistic opportunities and makes recommends a number of areas where further collaboration could be beneficial.

  12. Regulatory inspection practices for nuclear power plants in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Kellermann, Otto.

    1977-01-01

    Applicants for a licence as well as the competent bodies in this field are responsible for justifying the public's confidence in the quality and reliability of the uses of nuclear energy. This concern is reflected in the legal provisions and the philosophy applicable to statutory inspections in the Federal Republic of Germany. This paper describes the organisation, the purposes and the number of inspections performed at the design, the construction and the operational stages of nuclear power plants as well as the inspections organised following unexpected events and includes the comparison of various inspection costs with the overall costs of a nuclear power plant. (NEA) [fr

  13. Electromagnetic pulse research on electric power systems: Program summary and recommendations. Power Systems Technology Program

    Energy Technology Data Exchange (ETDEWEB)

    Barnes, P.R.; McConnell, B.W.; Van Dyke, J.W. [Oak Ridge National Lab., TN (United States); Tesche, F.M. [Tesche (F.M.), Dallas, TX (United States); Vance, E.F. [Vance (E.F.), Fort Worth, TX (United States)

    1993-01-01

    A single nuclear detonation several hundred kilometers above the central United States will subject much of the nation to a high-altitude electromagnetic pulse (BENT). This pulse consists of an intense steep-front, short-duration transient electromagnetic field, followed by a geomagnetic disturbance with tens of seconds duration. This latter environment is referred to as the magnetohydrodynamic electromagnetic pulse (NMENT). Both the early-time transient and the geomagnetic disturbance could impact the operation of the nation`s power systems. Since 1983, the US Department of Energy has been actively pursuing a research program to assess the potential impacts of one or more BENT events on the nation`s electric energy supply. This report summarizes the results of that program and provides recommendations for enhancing power system reliability under HENT conditions. A nominal HENP environment suitable for assessing geographically large systems was developed during the program and is briefly described in this report. This environment was used to provide a realistic indication of BEMP impacts on electric power systems. It was found that a single high-altitude burst, which could significantly disturb the geomagnetic field, may cause the interconnected power network to break up into utility islands with massive power failures in some areas. However, permanent damage would be isolated, and restoration should be possible within a few hours. Multiple bursts would likely increase the blackout areas, component failures, and restoration time. However, a long-term blackout of many months is unlikely because major power system components, such as transformers, are not likely to be damaged by the nominal HEND environment. Moreover, power system reliability, under both HENT and normal operating conditions, can be enhanced by simple, and often low cost, modifications to current utility practices.

  14. Green power programs in Canada : 2002 : Overview of Government green power policies, utility green power development programs, green power and certificate marketing initiatives, and their benefits

    International Nuclear Information System (INIS)

    Bramley, M.; Boustie, S.; Vadgama, J.; Wieler, C.; Pape-Salmon, A.; Holmes, R.

    2003-11-01

    Green power is generally defined as electricity produced from renewable sources, and whose production has low adverse impacts on the environment, human health and communities. Green power has near-zero greenhouse gas (GHG) emissions and includes sources such as wind, hydro, and solar power. Green power offers several environmental benefits, as well as the enhancement of energy security, regional development, economic diversification and the creation of skilled jobs. There are four categories of programs related to green power development in Canada: government green power policies, utility green power development programs, green power marketing initiatives, and green power certificate marketing initiatives. Most of the activities associated with these four categories in 2002 were discussed in this report. However, difficulties with quantification prevented the inclusion of some green power activities in the report, such as (1) the generation of green power not certified or identified by the generator as green power, (2) industry or residential self-generation, (3) net metering, and (4) small government programs. Each category was presented in detail. The information included in the report was based on surveys sent to each program proponent. Follow-up communications and other publicly available information was also included. New programs operating in 2003 or currently under development were listed. refs., 8 tabs

  15. Implementation and Sustainability of the Russian Federation Ministry of Defense Nuclear Personnel Reliability Program

    International Nuclear Information System (INIS)

    Lata, Vasiliy; Coates, Cameron W.

    2010-01-01

    Through a cooperative effort between the US Department of Energy and the Russian Federation (RF) Ministry of Defense (MOD) a Personnel Reliability Program (PRP) for the nuclear handlers within the RF MOD is at the stage of implementation. Sustaining the program is of major significance for long term success. This paper will discuss the elements of the RF PRP and the equipment needs for implementation. Program requirements, documentation needs, training, and assurances of appropriate equipment use will be addressed.

  16. Federal Geothermal Research Program Update Fiscal Year 1998

    Energy Technology Data Exchange (ETDEWEB)

    Keller, J.G.

    1999-05-01

    This report reviews the specific objectives, status, and accomplishments of DOE's Geothermal Research Program for Fiscal Year 1998. The Exploration Technology research area focuses on developing instruments and techniques to discover hidden hydrothermal systems and to expose the deep portions of known systems. The Reservoir Technology research combines laboratory and analytical investigations with equipment development and field testing to establish practical tools for resource development and management for both hydrothermal and hot dry rock reservoirs. The Drilling Technology projects focus on developing improved, economic drilling and completion technology for geothermal wells. The Conversion Technology research focuses on reducing costs and improving binary conversion cycle efficiency, to permit greater use of the more abundant moderate-temperature geothermal resource, and on the development of materials that will improve the operating characteristics of many types of geothermal energy equipment. Direct use research covers the direct use of geothermal energy sources for applications in other than electrical production.

  17. Federal Geothermal Research Program Update Fiscal Year 2000

    Energy Technology Data Exchange (ETDEWEB)

    Renner, J.L.

    2001-08-15

    The Department of Energy's Geothermal Program serves two broad purposes: (1) to assist industry in overcoming near-term barriers by conducting cost-shared research and field verification that allows geothermal energy to compete in today's aggressive energy markets; and (2) to undertake fundamental research with potentially large economic payoffs. The four categories of work used to distinguish the research activities of the Geothermal Program during FY 2000 reflect the main components of real-world geothermal projects. These categories form the main sections of the project descriptions in this Research Update. Exploration Technology research focuses on developing instruments and techniques to discover hidden hydrothermal systems and to explore the deep portions of known systems. Research in geophysical and geochemical methods is expected to yield increased knowledge of hidden geothermal systems. Reservoir Technology research combines laboratory and analytical investigations with equipment development and field testing to establish practical tools for resource development and management for both hydrothermal reservoirs and enhanced geothermal systems. Research in various reservoir analysis techniques is generating a wide range of information that facilitates development of improved reservoir management tools. Drilling Technology focuses on developing improved, economic drilling and completion technology for geothermal wells. Ongoing research to avert lost circulation episodes in geothermal drilling is yielding positive results. Conversion Technology research focuses on reducing costs and improving binary conversion cycle efficiency, to permit greater use of the more abundant moderate-temperature geothermal resource, and on the development of materials that will improve the operating characteristics of many types of geothermal energy equipment. Increased output and improved performance of binary cycles will result from investigations in heat cycle research.

  18. Federal Geothermal Research Program Update Fiscal Year 2000; ANNUAL

    International Nuclear Information System (INIS)

    Renner, J.L.

    2001-01-01

    The Department of Energy's Geothermal Program serves two broad purposes: (1) to assist industry in overcoming near-term barriers by conducting cost-shared research and field verification that allows geothermal energy to compete in today's aggressive energy markets; and (2) to undertake fundamental research with potentially large economic payoffs. The four categories of work used to distinguish the research activities of the Geothermal Program during FY 2000 reflect the main components of real-world geothermal projects. These categories form the main sections of the project descriptions in this Research Update. Exploration Technology research focuses on developing instruments and techniques to discover hidden hydrothermal systems and to explore the deep portions of known systems. Research in geophysical and geochemical methods is expected to yield increased knowledge of hidden geothermal systems. Reservoir Technology research combines laboratory and analytical investigations with equipment development and field testing to establish practical tools for resource development and management for both hydrothermal reservoirs and enhanced geothermal systems. Research in various reservoir analysis techniques is generating a wide range of information that facilitates development of improved reservoir management tools. Drilling Technology focuses on developing improved, economic drilling and completion technology for geothermal wells. Ongoing research to avert lost circulation episodes in geothermal drilling is yielding positive results. Conversion Technology research focuses on reducing costs and improving binary conversion cycle efficiency, to permit greater use of the more abundant moderate-temperature geothermal resource, and on the development of materials that will improve the operating characteristics of many types of geothermal energy equipment. Increased output and improved performance of binary cycles will result from investigations in heat cycle research

  19. Wind Power Today: 1998 Wind Energy Program Highlights

    Energy Technology Data Exchange (ETDEWEB)

    Tromly, K.

    1999-06-17

    The US Department of Energy's Office of Energy Efficiency and Renewable Energy manages the Federal Wind Energy Program. The mission of the program is to help the US wind industry to complete the research, testing, and field verification needed to fully develop advanced wind technologies that will lead the world in cost-effectiveness and reliability. This publication, printed annually, provides a summary of significant achievements in wind energy made during the previous calendar year. Articles include wind energy in the Midwest, an Alaskan wind energy project, the US certification program, structural testing, and the federal program in review.

  20. Federal Office of Energy Research program: Survey on Markers

    International Nuclear Information System (INIS)

    Buser, M.

    2012-01-01

    Marcos Buser presented the state of the art on markers by means of a literature survey; the study has synthesized the knowledge on markers, identified gaps and contradictions in the marker programs and addressed research areas that have been covered in the past. The boundary conditions for the study were that it would take a very broad inter- and trans- disciplinary approach that incorporates results and evidences. Questions related to knowledge transfer and long-term societal issues show important gaps of knowledge, particularly regarding message transmission. The transmission process is strongly dependent on contextual understanding, and better understanding of such contextual changes is necessary for better encoding. The general findings of the survey are: - Need of synthesis has been confirmed; - Contradictions in the goals of marker strategies must be identified; - Entirety: although questions of technical nature or relating to the natural sciences are easier than societal questions, all processes must be analyzed from a inter- and trans-disciplinary point of view, and not from specific perspectives; - The importance of social sciences is greatly underestimated. The specific findings are: - Research on intrusion motivation is crucial for the design of marker programs (as well as for the configuration of a repository); - System development has to be understood, not just the development of single elements; - Findings in semiotic sciences, message transmission and misinterpretation and misuse are decisive. In the discussion, the question was raised whether the repository itself may acts as a marker, for instance because of the fact that all advanced drills apparently have a radiation detector, or, additionally, by adding symbols on the walls of the shafts. Buser underlined that knowledge transfer and long-term societal issues raises a series of questions related to stability of societies, stability of social structures, evolution of laws and regulations, transfer

  1. The federal structure: Can Congress commmandeer Nevada to participate in its federal high level waste disposal program?

    International Nuclear Information System (INIS)

    Davenport, J.

    1993-01-01

    This article examines the national disposal system for nuclear waste under the Nuclear Waste Policy Act (NWPA), as enacted in 1982 and amended in 1987 and 1992, focusing particularly on the constitutionality of the Act's open-quotes notice of disapprovalclose quotes and open-quotes congressional overrideclose quotes provisions. Part I of this article describes the notice of disapproval and congressional override provisions of the NWPA, including a brief analysis of their legislative history. Part II discusses the advantages of the federal structure as a protection against the exercise of autocratic congressional power, and studies the United States Supreme Court's approach to federalism in two recent cases. Part III addresses Nevada's experience under the NWPA. Parts IV and V analyze the constitutionality of the notice of disapproval and congressional override provisions of the NWPA in light of these two Supreme Court holdings. Part VI discusses the open-quotes environmental subsidyclose quotes imposed by the NWPA. Part VII concludes the article with a more practical, workable and constitutionally-defensible alternative to the existing waste disposal siting process

  2. Reports on research programs in the field of reactor safety sponsored by the Federal Ministry for Research and Technology

    International Nuclear Information System (INIS)

    1986-11-01

    Investigations on the safety of Light Water Reactors (LWR) being performed in the framework of the research program on reactor safety (RS-projects) are sponsored by the Federal Ministry for Research and Technology (BMFT). Objective of this program is to investigate in greater detail the safety margins of nuclear power plants and their systems and the further development of safety technology. Besides the investigations of LWR tasks also projects on the safety of advanced reactors are sponsored by the BMFT. The individual reports are classified according to the research program on the safety of LWRs 1977-1980 of the BMFT. Another table of contents uses the same classification system as applied in the nuclear safety index of the CEC (Commission of the European Communities) and the OECD (Organization for Economic Cooperation and Development). The reports are arranged in the sequence of their project numbers. (orig./HP) [de

  3. Reports of research programs in the field of reactor safety sponsored by the Federal Ministry for Research and Technology

    International Nuclear Information System (INIS)

    1986-06-01

    Investigations on the safety of Light Water Reactors (LWR) being performed in the framework of his research program on reactor safety (RS-projects) are sponsored by the Federal Ministry for Research and Technology (BMFT). Objective of this program is to investigate in greater detail the safety margins of nuclear power plants and their systems and the further development of safety technology. Besides the investigations of LWR tasks also projects on the safety of advanced reactors are sponsored by the BMFT. The individual reports are classified according to the research program on the safety of LWRs 1977-1980 of the BMFT. Another table of contents uses the same classification system as applied in the nuclear safety index of the CEC (Commission of the European Communities) and the OECD (Organization for Economic Cooperation and Development). The reports are arranged in the sequence of their project numbers. (orig./HP) [de

  4. Federal Employees Health Benefits Program: Removal of Eligible and Ineligible Individuals From Existing Enrollments. Final rule.

    Science.gov (United States)

    2018-01-23

    The United States Office of Personnel Management (OPM) is issuing a final rule amending Federal Employees Health Benefits (FEHB) Program regulations to provide a process for removal of certain identified individuals who are found not to be eligible as family members from FEHB enrollments. This process would apply to individuals for whom there is a failure to provide adequate documentation of eligibility when requested. This action also amends Federal Employees Health Benefits (FEHB) Program regulations to allow certain eligible family members to be removed from existing self and family or self plus one enrollments.

  5. 1995 Federal Research and Development Program in Materials Science and Technology

    Energy Technology Data Exchange (ETDEWEB)

    None

    1995-12-01

    materials R&D program also supports the Administration's specific technological objectives, emphasizing development of affordable, high-performance commercial and military aircraft; ultra-fuel-efficient, low-emissions automobiles that are also safe and comfortable; powerful yet inexpensive electronic systems; environmentally safe products and processes; and a durable building and transportation infrastructure.

  6. Striking the Right Balance: Federal Infrastructure Transfer Programs, 2002–2015

    Directory of Open Access Journals (Sweden)

    Bev Dahlby

    2015-11-01

    Full Text Available Over the last 13 years, the federal government has helped fund a wide array of infrastructure programs: A total of 8,012 projects across the country between 2002 and 2015, funded to the tune of $20.3 billion. A substantial portion of that was done in the name of recession “stimulus.” But far from all of it. And, for better or worse, federal programs have become a permanent feature of fiscal federalism. The only question now is, whether Ottawa has been spending federal taxpayer money as effectively as possible when it does fund these projects. As it turns out, federal handouts for projects in Canadian provinces and municipalities have been relatively well deployed. An analysis finds that a greater amount of federal matching funds were dedicated to projects where provinces faced a higher marginal cost of public funds than the federal government, helping to at least somewhat minimize the negative economic impacts of the additional tax burden. And that a greater amount of funds was dedicated to projects that enhanced economic productivity, such as transit and roads, which increase the probability for national spillover benefits due to the potential for increased federal tax revenue, unlike quality-oflife projects (such as recreation projects that do not. However, the persistent fiscal imbalance in the provinces’ and the federal government’s marginal cost of raising public funds can only continue to exacerbate the demands from provinces for federal matching funds. Despite federal fiscal equalization programs that provide transfers to provinces with below-average per capita tax bases, there remain notable horizontal fiscal imbalances across the provinces, and a vertical imbalance between lower and higher government levels. Recent estimates calculate the federal government’s marginal cost to be 1.17, compared to a range of 1.41 for Alberta to 3.60 for Ontario, more than three times as high as the federal government’s cost. There are already

  7. Federal Court of Administration dismissed appeals in nuclear power plant proceedings

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    On July 18, 1980 the Federal Court of Administration handed down several decisions made in proceedings on nuclear power stations. It dismissed the appeal field by the complaining party. 1. In the proceedings concerning the Kruemmel reactor being about to be completed, the World Association for the Protecteion of Life was again denied the right to file a complaint. 2. In the proceedings concerning the nuclear power station under construction at Muelheim-Kaerlich, the objections raised were regarded as being insufficient for repealing the licence. 3. In the proceedings concerning the nuclear power staion at Wyhl which has not been built yet, the objections raised were declared not to be sufficiently substantiated in time. The written opinions of all proceedings are not yet available. (HSCH) [de

  8. Green power programs in Canada : 2003 : overview of Government green power policies, utility green power implementation initiatives, green power and certificate marketing programs, and their benefits

    International Nuclear Information System (INIS)

    Whitmore, J.; Bramley, M.; Holmes, R.

    2004-09-01

    Green power is defined as electricity produced from renewable sources, and whose production has low adverse impacts on the environment, human health and communities. Green power has near-zero greenhouse gas (GHG) emissions and includes sources such as wind, hydro, and solar power. It offers several environmental benefits, as well as the enhancement of energy security, regional development, economic diversification and the creation of skilled jobs. There are four categories of programs related to green power development in Canada: government green power policies, utility green power development programs, green power marketing initiatives, and green power certificate marketing initiatives. Most of the activities in Canada associated with these four categories in 2003 were discussed in this report. However, difficulties with quantification prevented the inclusion of some green power activities such as (1) the generation of green power not certified or identified by the generator as green power, (2) industry or residential self-generation, (3) net metering, and (4) small government programs. Green power generation facilities in 2003 totaled 775 MW of capacity compared to 539 MW in 2002. Hydro capacity represented 41 per cent, followed by wind capacity at 40 per cent and wood waste at 17 per cent. Most of the green power generation facilities in 2003 were located in Alberta, followed by British Columbia, Ontario and Quebec. 230 refs., 8 tabs., 1 fig

  9. Lessons learned -- NREL Village Power Program

    Energy Technology Data Exchange (ETDEWEB)

    Flowers, L.

    1998-07-01

    In 1993, a workshop was convened at the National Renewable Energy Laboratory (NREL) to discuss the issues of applying renewable energy in a sustainable manner to international rural development. One of the summary recommendations was that NREL could assist in the renewable energy for rural electrification effort by developing and supplying six related activities: resource assessment, comparative analysis and modeling, performance monitoring and analysis, pilot project development, internet-based project data, communications, and training. In response to this recommendation, NREL launched its Village Power Program consisting of these activities that cut across NREL technologies and disciplines. Currently NREL is active in 20 countries, with pilot projects in 12 of those countries. At this time the technologies include photovoltaics, wind, biomass, and hybrids. The rural applications include home lighting and communications, water pumping, schools and health posts, battery charging stations, ecotourism, and village systems. These pilot projects are central to the renewable energy village power development through the demonstration of three aspects critical to replication and implementation of the projects on a significant scale. The three aspects are technical functionality, economic competitiveness, and institutional sustainability. It is important to note that the pilot projects from which NREL's experience has been gained were funded and, in many cases, developed by other organizations and agencies. NREL's role has been one of technical assistance or project management or both. The purpose of this paper is to describe the lessons NREL staff has gleaned from their participation in the various pilot projects. The author hopes that these lessons will help the Renewable Energy-Based Rural Electrification (RERE) community in implementing sustainable projects that lead to replication.

  10. Radiation exposure control of nuclear power plant personnel in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Mehl, J.

    1980-01-01

    The analysis of exposure records of all persons engaged in radiation work at nuclear power plants of the Federal Republic of Germany has shown that annual collective doses increase rapidly with time. The annual gross electrical energy generated from nuclear power also increases rapidly with time, corresponding to about 11% of the total gross electrical energy produced in 1977/78. Therefore, it is obvious that there is an increase of both the risk and the benefit from nuclear power production. Whether in the course of time the situation develops more towards the risk or the benefit side is learned from the history of the annual ratio of the collective dose per gross electrical energy generated. This ratio shows a significant decrease since 1972. The decrease is due to the experience gained from operation of the first-generation plants, which led to several administrative measures aimed at an improved control of the collective doses of power plant personnel in the Federal Republic of Germany. The administrative measures include, among others, the introduction of the following requirements: (a) Everyone who applies for a nuclear power plant construction licence has to provide evidence that, in the design of the plant, full use is made of the experience gained from plants in operation with respect to reduction of collective doses of the power plant personnel. (b) Everyone who engages his employees on radiation work within operations for which an operation licence is required, but which is held by others, requires a special 'contractor licence'. (c) Every person engaged in radiation work on the basis of a contractor licence must carry a special exposure record book which is registered by the competent national authority. (author)

  11. Goal implementation perspectives of the Framework U N Convention on Climate Change in Russian Federation - Federal Objective Program on prevention of dangerous climate change and their negative consequences

    International Nuclear Information System (INIS)

    Bedritskij, A.I.; Berdin, V.Kh.; Karpov, A.V.

    1997-01-01

    Principal goals and tasks of Federal Target-oriented Program (FTP), system of program measures, its resources ensuring, mechanism for the FTP realization, supervision of execution and data on assessment of its effectiveness are expounded. Results of Russian Federation Inter-department commission activity on climate change issues are cited. Some aspects of negotiation process on Framework U N Convention o climate change are considered. (author)

  12. Computer program analyzes and monitors electrical power systems (POSIMO)

    Science.gov (United States)

    Jaeger, K.

    1972-01-01

    Requirements to monitor and/or simulate electric power distribution, power balance, and charge budget are discussed. Computer program to analyze power system and generate set of characteristic power system data is described. Application to status indicators to denote different exclusive conditions is presented.

  13. Concentrating Solar Power Program Review 2013 (Book) (Revised)

    Energy Technology Data Exchange (ETDEWEB)

    2013-06-01

    This U.S. Department of Energy (DOE) Concentrating Solar Power Program Review Meeting booklet will be provided to attendees at the Concentrating Solar Power Review Meeting in Phoenix, Arizona on April 23-25, 2013.

  14. Gene expression programming for power system static security ...

    African Journals Online (AJOL)

    user

    Keywords: static security, gene expression programming, probabilistic neural network ... Hence digital computers are usually installed in operations control centers to gather ...... power system protection, and applications of AI in power systems.

  15. 2015 Key Water Power Program and National Laboratory Accomplishments

    Energy Technology Data Exchange (ETDEWEB)

    Office of Energy Efficiency and Renewable Energy

    2016-01-01

    The U.S. Department of Energy Water Power Program is committed to developing and deploying a portfolio of innovative technologies and market solutions for clean, domestic power generation from water resources across the United States.

  16. Nuclear power plant licensing and supervision in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Gehrhardt, H.J.; Gottschalk, P.A.

    1991-01-01

    This paper briefly describes nuclear power plant licensing and supervision in the Federal Republic of Germany (FRG). Peculiarities due to the federal structure of the FRG are outlined paying due regard to the long tradition of using consultation by qualified and independent technical experts. The participating authorities, commissions, expert organizations, vendors, utilities and the public as well as their respective competences are mentioned. Also, the hierarchy in nuclear legislation by means of ordinances, administrative regulations, guidelines and technical standards is pointed out. Typical examples are presented. The paper ends in mentioning important items concerning the evaluation of operating experience, recurrent tests, backfitting, lessons learned from the Chernobyl accident, safety research concerning accident management measures, on-site and off-site emergency planning, as well as qualification and occupational training of the responsible shift personnel. (orig.)

  17. An independent investigation into the deployment of the federal communications commissions' rural health care pilot program.

    Science.gov (United States)

    Whitten, Pamela; Holtz, Bree; Laplante, Carolyn; Alverson, Dale; Krupinski, Elizabeth

    2010-12-01

    the goal of this study was to provide an independent and objective evaluation of the implementation of the Federal Communications Commission's Rural Health Care Pilot Program. thirty-nine of the programs that were provided funding through this program were interviewed and asked about their project deployment, network planning, and the involvement of their state in implementation. RESULTS showed that programs recruited project team members from a variety of fields to fulfill different roles. Network partners were often chosen because they were stakeholders in the outcome of the project and because they had a past working relationship with the grant-receiving programs. In terms of deployment, many programs had made progress in filling out necessary paperwork and were tracking milestones, but had experienced changes since first receiving funding, such as losing participants. Additionally, many encountered challenges that inhibited deployment, such as coping with rule fluctuations. Many of the programs received support from their respective state governments in project development, often through matching funds, but few states were involved in the actual management of projects. as rural healthcare facilities often lack the information technology infrastructure compared with many urban facilities, it is important to understand the implementation process for programs such as the Rural Health Care Pilot Program and to examine what contributes to progress, stagnation, or disintegration. Although the programs reported some success, almost all had encountered challenges that inhibited implementation. A follow-up study is planned to further investigate deployment and determine the implications of Federal Communications Commission funding.

  18. Status of human factors research program in Central Research Institute of Electric Power Industry

    International Nuclear Information System (INIS)

    Kabetani, Tetsuji

    1989-01-01

    The Human Factors Research Center was established within CRIEPI on July 1, 1987 as its research efforts to reduce human error during operation and maintenance at Japanese nuclear power plants. The Research Program has seven subjects, composed of the original subjects that include the human behavior monitoring method, and the subjects requested by the Federation of Electric Power Companies that include the establishment of techniques of analysing and evaluating information on human error. Some results of the activity are applied in nuclear power plants. We plan to obtain good results to apply to plants, and to improve the results already obtained. (author)

  19. VA Dental Insurance Program--federalism. Direct final rule; confirmation of effective date.

    Science.gov (United States)

    2014-03-20

    The Department of Veterans Affairs (VA) published a direct final rule in the Federal Register on October 22, 2013, amending its regulations related to the VA Dental Insurance Program (VADIP), a pilot program to offer premium-based dental insurance to enrolled veterans and certain survivors and dependents of veterans. Specifically, this rule adds language to clarify the limited preemptive effect of certain criteria in the VADIP regulations. VA received no comments concerning this rule or its companion substantially identical proposed rule published in the Federal Register on October 23, 2013. This document confirms that the direct final rule became effective on December 23, 2013. In a companion document in this issue of the Federal Register, we are withdrawing as unnecessary the proposed rule.

  20. Beznau nuclear power plant: comments of the Federal Department of Transport, Communications and Energy on the reproaches of Greenpeace

    International Nuclear Information System (INIS)

    Ogi, A.

    1995-01-01

    Answer of the chairman of the EVED (Federal Department of Transport, Communications and Energy) to the open letter in which Greenpeace Switzerland made massive accusations against the nuclear power plant Beznau and the HSK (Federal Nuclear Safety Inspectorate). All the charges are rebutted in this answer

  1. The Family and Federal Drug Abuse Policies--Programs: Toward Making the Invisible Family Visible.

    Science.gov (United States)

    Clayton, Richard R.

    1979-01-01

    Notes why the family is not considered in drug policy and programing and asserts that existing conditions demand conscious consideration of the family in efforts of federal drug agencies. Data show changing parameters of drug use-abuse. A research and prevention agenda that integrates the family is presented. (Author/BEF)

  2. Audit Guide: Audits of Federal Student Financial Assistance Programs at Participating Institutions and Institution Servicers.

    Science.gov (United States)

    Office of Inspector General (ED), Washington, DC.

    All institutions participating in the Federal Student Financial Assistance Programs must have an annual financial aid compliance audit performed by an independent auditor. This guide is effective for fiscal years ending December 31, 1999, and thereafter, for institutions preparing for their yearly audit. The purpose of the document is to assist…

  3. Beyond Rehabilitation: The Federal City College Lorton Project--A Model Prison Higher Education Program

    Science.gov (United States)

    Taylor, Andress

    1974-01-01

    A description and evaluation of the Federal City College (the first Urban Land Grant institution in the nation) higher education program offered in association with a group of Washington, D.C., penal institutions located in Lorton, Virginia. This Lorton Project has been adopted as a National Model by the Department of Health, Education, and…

  4. Multimodal shipments under program on Russian-origin research reactor SFA return to Russian Federation

    International Nuclear Information System (INIS)

    Dorofeev, A.N.; Ivashchenko, A.A.; Kanashov, B.A.; Komarov, S.V.; Komarov, S.N.; Barinkov, O.P.

    2010-01-01

    The paper describes experience in preparation and organization of research reactor nuclear material import under the Program on Russian-Origin Highly Enriched Uranium Return to the Russian Federation. It also summarizes evolution of transport equipment, conveyances and routes and describes types of packages, their adaptation and certification, safety issues, peculiarities and prospective use of the packagings and conveyances. (author)

  5. 76 FR 67370 - Federal Property Management Regulation (FPMR); Procurement Sources and Programs

    Science.gov (United States)

    2011-11-01

    ... to agency management and personnel. List of Subjects in 41 CFR Part 101-26 Procurement sources and... MANAGEMENT REGULATIONS PART 101-26--PROCUREMENT SOURCES AND PROGRAMS 0 1. The authority for 41 CFR part 101...; Docket Number 2011-017; Sequence 1] RIN 3090-AJ19 Federal Property Management Regulation (FPMR...

  6. Gender Differences in Major Federal External Grant Programs. Technical Report Summary

    Science.gov (United States)

    Hosek, Susan D.; Cox, Amy G.; Ghosh-Dastidar, Bonnie; Kofner, Aaron; Rampal, Nishal; Scott, Jon; Berry, Sandra H.

    2005-01-01

    The Wyden amendment to the National Science Foundation (NSF) Authorization Act of 2002 sought to determine whether federally funded educational programs other than sports comply with Title IX, which prohibits gender discrimination. At the request of NSF, this report analyzes administrative data from fiscal years 2001 through 2003 describing the…

  7. Improving the School Program through the Effective Use of Federal Funds.

    Science.gov (United States)

    McFarland, Dan

    This pamphlet shows school personnel how to apply successfully for Federal grants to finance improvements in educational programs. Advice is given on the importance of evaluating needs, objectives, and procedures as a prerequisite to writing a proposal. Next, suggestions for writing a good proposal are made, including references to the need for…

  8. 78 FR 32991 - Medicaid Program; Increased Federal Medical Assistance Percentage Changes Under the Affordable...

    Science.gov (United States)

    2013-06-03

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Medicare & Medicaid Services 42 CFR Part 433 [CMS-2327-CN] RIN 0938-AR38 Medicaid Program; Increased Federal Medical Assistance Percentage Changes Under the Affordable Care Act of 2010; Correction AGENCY: Centers for Medicare & Medicaid Services (CMS...

  9. 76 FR 17617 - Multi-Agency Informational Meeting Concerning Compliance With the Federal Select Agent Program...

    Science.gov (United States)

    2011-03-30

    ... assessments, biosafety requirements, and security measures. DATES: The meeting will be held on May 10, 2011...) and other interested individuals to obtain specific regulatory guidance and information on standards concerning biosafety and biosecurity issues related to the Federal Select Agent Program. CDC, APHIS, and FBI...

  10. 77 FR 1743 - Discount Rates for Cost-Effectiveness Analysis of Federal Programs

    Science.gov (United States)

    2012-01-11

    ... OFFICE OF MANAGEMENT AND BUDGET Discount Rates for Cost-Effectiveness Analysis of Federal Programs... Appendix C are to be used for cost-effectiveness analysis, including lease-purchase analysis, as specified... (Revised December 2011) Discount Rates for Cost-Effectiveness, Lease Purchase, and Related Analyses...

  11. 76 FR 7881 - Discount Rates for Cost-Effectiveness Analysis of Federal Programs

    Science.gov (United States)

    2011-02-11

    ... OFFICE OF MANAGEMENT AND BUDGET Discount Rates for Cost-Effectiveness Analysis of Federal Programs... Appendix C are to be used for cost-effectiveness analysis, including lease-purchase analysis, as specified... (Revised December 2010) DISCOUNT RATES FOR COST-EFFECTIVENESS, LEASE PURCHASE, AND RELATED ANALYSES...

  12. 78 FR 6140 - Discount Rates for Cost-Effectiveness Analysis of Federal Programs

    Science.gov (United States)

    2013-01-29

    ... OFFICE OF MANAGEMENT AND BUDGET Discount Rates for Cost-Effectiveness Analysis of Federal Programs... in Appendix C are to be used for cost-effectiveness analysis, including lease-purchase analysis, as...) Discount Rates for Cost-Effectiveness, Lease Purchase, and Related Analyses Effective Dates. This appendix...

  13. PUBLIC HEARING TRANSCRIPT: FEDERAL NON-NUCLEAR ENERGY RESEARCH AND DEVELOPMENT PROGRAM

    Science.gov (United States)

    This document presents the proceedings of three days of public hearings on the Federal Non-nuclear Energy Research and Development Program. The document is presented in three sections: (1) Future Energy Patterns and Levels of Coal Use, (2) Solar Energy and Conservation, and (3) O...

  14. 13 CFR 121.402 - What size standards are applicable to Federal Government Contracting programs?

    Science.gov (United States)

    2010-01-01

    ... Size Eligibility Requirements for Government Procurement § 121.402 What size standards are applicable... being purchased. Other factors considered include previous Government procurement classifications of the... to Federal Government Contracting programs? 121.402 Section 121.402 Business Credit and Assistance...

  15. Market impacts of hypothetical fuel treatment thinning programs on federal lands in the western United States

    Science.gov (United States)

    Peter J. Ince; Henry Spelter; Kenneth Skog; Andrew Kramp; Dennis P. Dykstra

    2000-01-01

    This paper addresses the economics of forest fuel thinning programs on federal lands in the U.S. West, and presents a model of regional timber and product market impacts. The issue of economics is vital to the debate about fire management, and this paper presents market implications of two alternative silvicultural strategies, even-aged and uneven-aged...

  16. 78 FR 26504 - Women-Owned Small Business Federal Contract Program

    Science.gov (United States)

    2013-05-07

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 127 RIN 3245-AG55 Women-Owned Small Business Federal... statutory limitation on the dollar amount of a contract that women-owned small businesses can compete for under the Women-Owned Small Business (WOSB) Program. As a result, contracting officers may now set-aside...

  17. 77 FR 17352 - Federal Acquisition Regulation; Women-Owned Small Business (WOSB) Program

    Science.gov (United States)

    2012-03-26

    ...-AL97 Federal Acquisition Regulation; Women-Owned Small Business (WOSB) Program Correction In rule...) * * * -- (24) 52.219-29, Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business (EDWOSB... Disadvantaged Women- Owned Small Business Concerns. * * * * * Notice of Set-Aside for Economically Disadvantaged...

  18. 76 FR 40593 - Competitive and Noncompetitive Non-Formula Federal Assistance Programs-Administrative Provisions...

    Science.gov (United States)

    2011-07-11

    ...;Prices of new books are listed in the first FEDERAL REGISTER issue of each #0;week. #0; #0; #0; #0;#0... gasification research priorities of USDA and the Department of Energy at the State and regional levels. With... Economics. Purpose The objectives of the Sun Grant Program are to enhance national energy security through...

  19. Competing definitions: a public policy analysis of the federal recreational fee demonstration program

    Science.gov (United States)

    Thomas A. E. More

    2003-01-01

    Problem definition theory specifies that however controls the definition of a problem is in a unique position to control debate over the issue, influence others, and determine the problem's place on the agenda. This paper uses a rhetorical analysis and a questionnaire survey of congressional aides to examine the federal Recreational Fee Demonstration Program....

  20. Federally Funded Education and Job Training Programs for Low-Income Youth

    Science.gov (United States)

    Dworsky, Amy

    2011-01-01

    With the growing demand for highly skilled workers and declining wages for those who are less skilled, low-income youth with limited education and no work experience have few opportunities for gainful employment. Since the Great Depression, the federal government has been funding programs that provide low-income, out-of-school, and unemployed…

  1. Safety concept of nuclear power plants in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Schnurer, H.L.; Seipel, H.G.

    1983-01-01

    The safety philosophy of the Federal Republic of Germany (FRG) pertaining to nuclear power plants is presented. Its general approach makes much use of research and experience in other countries, especially the United States, but the FRG has also evolved approaches and aspects unique to itself. The article discusses the institutional interrelationships of the entities affecting German nuclear power plant safety and presents the resulting German safety philosophy. This philosophy is based, as in the United States, on multilevel defenses but with greater reliance on a number of accident-prevention and/or -mitigation concepts, including: (1) automated responses to off-normal conditions, (2) an operating-limit system that acts before initiation of protective actions by the reactor protection system, (3) multistrand independent safety trains, and (4) long-term self-contained safety under accident conditions without operator intervention. The practical realization of this philosophy in the design and operation of the chief reactor systems is described

  2. Program status of the high temperature reactor development in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    1984-01-01

    The status of the HTR development program in the Federal Republic of Germany in 1984 is characterized by the beginning of a transition phase from a national program to a commercial program. In the last 20 years the HTR technology program was strongly, nearly completely supported by the Federal Government and the State Government of North-Rhine-Westfalia. Funding of the program up to now exceeded 5 billion DM. Within this framework it was possible to establish competent-reactor-system companies, to enable industries to supply HTR- specific components including fuel elements and nuclear graphites, to maintain the strong engagement of the national centre KFA Juelich in general R and D activities, to build and operate the AVR-plant for more than 16 years, to erect the demonstration plant THTR-300 now approaching completion and to build and operate many efficient test facilities. Thereby the HTR technology development achieved a stage of maturity which is not only considered to be most advanced, but is also ready now for commerical deployment. The assessment report which comprised both the fast breeder and the HTR development included all major impacts, such as history, status, prospects, benefits, industrial aspects and international developments of the technology. The program description is facilitated by distinguishing the five major program elements: AVR, THTR-300, THTR follow-up plant, nuclear process heat program, fuel cycle activities

  3. The Power of Politic and Lobbying Parties in the Australian Accounting Regulation Reform Program

    OpenAIRE

    Suwaldiman, Suwaldiman

    2004-01-01

    This paper argues that Australian accounting regulations seem to be close to the government or political approach in its setting process. CLERP (Corporate Law Economic Reform Program) proposed by government can be viewed as changes made by Federal Government in the structure of setting accounting standards that show a substantial shift in power from the two professional accounting bodies; ICAA (The Institute of Certified Accountants in Australia) and ASCPA (Australian Society of Certified Pra...

  4. The Power Of Politic and Lobbying Parties in the Australian Accounting Regulation Reform Program

    OpenAIRE

    Suwaldiman, Suwaldiman

    2009-01-01

    This paper argues that Australian accounting regulations seem to be close to the government or political approach in its setting process. CLERP (Corporate Law Economic Reform Program) proposed by government can be viewed as changes made by Federal Government in the structure of setting accounting standards that show a substantial shift in power from the two professional accounting bodies; ICAA (The Institute of Certified Accountants in Australia) and ASCPA (Australian Society of Certified Pra...

  5. Safety philosophy and research program of the LWR development in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Nickel, H.

    1978-11-01

    In this paper the framework of the reactor safety concept in the Federal Republic of Germany will be described. It is grounded on several cornerstones the most important of which are a closed fuel cycle concept, a statutory licensing and supervision procedure, a set of compulsory safety-engineering requirements and comprehensive research in the field of reactor-safety. The main part of this last area is the Reactor Safety Research Program sponsored by the Federal Minister for Research and Technology. Furthermore, in this paper emphasis is laid on safety requirements particularly with regard to the quality of the reactor pressure vessel. (orig.) [de

  6. A Computer Program for Short Circuit Analysis of Electric Power ...

    African Journals Online (AJOL)

    The Short Circuit Analysis Program (SCAP) is to be used to assess the composite effects of unbalanced and balanced faults on the overall reliability of electric power system. The program uses the symmetrical components method to compute all phase and sequence quantities for any bus or branch of a given power network ...

  7. 25 CFR 170.135 - Can a tribe use Federal funds for its recreation, tourism, and trails program?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Can a tribe use Federal funds for its recreation, tourism... Eligibility Recreation, Tourism and Trails § 170.135 Can a tribe use Federal funds for its recreation, tourism... funds for recreation, tourism, and trails programs if the programs are included in the IRRTIP...

  8. Implications of Harmonizing the Future of the Federal Depository Library Program within E-Government Principles and Policies

    Science.gov (United States)

    Shuler, John A.; Jaeger, Paul T.; Bertot, John Carlo

    2010-01-01

    For more than 150 years, the United States Government Printing Office (GPO), along with its Federal Depository Library Program (FDLP), has supported an informed citizenry and democracy by ensuring access and preservation to a broad swath of federal government information. This collaborative national public information program between local…

  9. 78 FR 63464 - William D. Ford Federal Direct Loan Program Repayment Plan Selection Form; Extension of Public...

    Science.gov (United States)

    2013-10-24

    ... DEPARTMENT OF EDUCATION William D. Ford Federal Direct Loan Program Repayment Plan Selection Form; Extension of Public Comment Period; Correction AGENCY: Department of Education. ACTION: Correction notice... entitled, ``William D. Ford Federal Direct Loan Program Repayment Plan Selection Form''. ED is extending...

  10. The Federal Government's Presumption in Procurement Affirmative Action Programs That Americans of Thirty-Seven Nationalities or Ethnicities are Disadvantaged is on a Collision Course With Strict Scrutiny

    National Research Council Canada - National Science Library

    Sabin, Sean

    2003-01-01

    Federal affirmative action procurement programs have evolved tremendously since President Roosevelt issued an executive order that prohibited federal government contractors from engaging in discrimination...

  11. Overall quality assurance program requirements for nuclear power plants

    International Nuclear Information System (INIS)

    1992-09-01

    This standard contains the requirements for the owner's overall quality assurance program for a nuclear power plant. This program encompasses all phases of a nuclear power plant life cycle, including site evaluation, design, procurement, manufacturing, construction and installation, commissioning, operation, and decommissioning. It covers the activities associated with specifying, directing, and administering the work to be done during these phases, and the evaluation and integrated of the activities and programs of participants

  12. 78 FR 47180 - Basic Program Elements for Federal Employee Occupational Safety and Health Programs and Related...

    Science.gov (United States)

    2013-08-05

    ... considered separate establishments. Each Federal department has an organizational structure consisting of... apply to all agencies of the Executive Branch except military personnel and uniquely military equipment.... Occupational injury and illness records, and the statistics based on them, have several desired functions or...

  13. 76 FR 11415 - Federal Motor Vehicle Safety Standards; Power-Operated Window, Partition, and Roof Panel Systems

    Science.gov (United States)

    2011-03-02

    ... [Docket No. NHTSA-2011-0027] RIN 2127-AK52 Federal Motor Vehicle Safety Standards; Power-Operated Window, Partition, and Roof Panel Systems AGENCY: National Highway Traffic Safety Administration (NHTSA), Department... automatic reversal systems (ARS) for power windows and to make a final decision. The agency has decided not...

  14. Spanish program of advanced Nuclear Power Plants

    International Nuclear Information System (INIS)

    Marco, M.; Redon, R.

    1993-01-01

    The energy Spanish Plan is promoting some actions within the area of advanced reactors. Efforts are focussed onto the European Program of Advanced Reactors, the Program of Passive Plants (EPRI), European Fast Reactor Project and the APWR-1000 Program of INI. Electrical sector utilities and industrial partners supported by the Administration have organized an steering committee. The program of Passive Plants includes activities on Qualification, design and detailed engineering (Qualification project, SBWR project of G.E. and AP600 Project of Westinghouse. The european project on advanced plants has the following Spanish contribution: Analysis of alternative Dossier on European requisites (EUR) and Design of an European Reactor (EPR)

  15. Annual Report on Federal Government Energy Management and Conservation Programs, Fiscal Year 2010

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-03-01

    Annual reports on Federal energy management respond to section 548 of the National Energy Conservation Policy Act (NECPA, Pub. L. No. 95-619), as amended, and provide information on energy consumption in Federal buildings, operations, and vehicles. Compiled by the Federal Energy Management Program, these reports document activities conducted by Federal agencies under the: Energy management and energy consumption requirements of section 543 of NECPA, as amended (42 U.S.C. § 8253); Energy savings performance contract authority of section 801 of NECPA, Pub. L. No. 95-619, as amended (42 U.S.C. §§ 8287-8287d); Renewable energy purchase goal of section 203 of the Energy Policy Act (EPAct) of 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 15852); Federal building performance standard requirements under Section 109 of EPAct 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 6834(a)); Requirements on the procurement and identification of energy efficient products under section 161 of EPAct 1992, Pub. L. No. 102-486 (codified at 42 U.S.C. § 8262g); Sections 431, 432, and 434 of the Energy Independence and Security Act of 2007 (EISA), Pub. L. No. 110-140 (42 U.S.C. § 8253) and section 527 of EISA (42 U.S.C. § 17143); Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management, 72 Fed. Reg. 3,919 (Jan. 26, 2007); Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, 74 Fed. Reg. 52,117 (Oct. 5, 2009).

  16. Annual Report on Federal Government Energy Management and Conservation Programs, Fiscal Year 2013

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-04-01

    Annual reports on Federal energy management respond to section 548 of the National Energy Conservation Policy Act (NECPA, Pub. L. No. 95-619), as amended, and provide information on energy consumption in Federal buildings, operations, and vehicles. Compiled by the Federal Energy Management Program, these reports document activities conducted by Federal agencies under the: Energy management and energy consumption requirements of section 543 of NECPA, as amended (42 U.S.C. § 8253); Energy savings performance contract authority of section 801 of NECPA, Pub. L. No. 95-619, as amended (42 U.S.C. §§ 8287-8287d); Renewable energy purchase goal of section 203 of the Energy Policy Act (EPAct) of 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 15852); Federal building performance standard requirements under Section 109 of EPAct 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 6834(a)); Requirements on the procurement and identification of energy efficient products under section 161 of EPAct 1992, Pub. L. No. 102-486 (codified at 42 U.S.C. § 8262g); Sections 431, 432, and 434 of the Energy Independence and Security Act of 2007 (EISA), Pub. L. No. 110-140 (42 U.S.C. § 8253) and section 527 of EISA (42 U.S.C. § 17143); Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management, 72 Fed. Reg. 3,919 (Jan. 26, 2007); Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, 74 Fed. Reg. 52,117 (Oct. 5, 2009).

  17. Annual Report on Federal Government Energy Management and Conservation Programs, Fiscal Year 2012

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-03-01

    Annual reports on Federal energy management respond to section 548 of the National Energy Conservation Policy Act (NECPA, Pub. L. No. 95-619), as amended, and provide information on energy consumption in Federal buildings, operations, and vehicles. Compiled by the Federal Energy Management Program, these reports document activities conducted by Federal agencies under the: Energy management and energy consumption requirements of section 543 of NECPA, as amended (42 U.S.C. § 8253); Energy savings performance contract authority of section 801 of NECPA, Pub. L. No. 95-619, as amended (42 U.S.C. §§ 8287-8287d); Renewable energy purchase goal of section 203 of the Energy Policy Act (EPAct) of 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 15852); Federal building performance standard requirements under Section 109 of EPAct 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 6834(a)); Requirements on the procurement and identification of energy efficient products under section 161 of EPAct 1992, Pub. L. No. 102-486 (codified at 42 U.S.C. § 8262g); Sections 431, 432, and 434 of the Energy Independence and Security Act of 2007 (EISA), Pub. L. No. 110-140 (42 U.S.C. § 8253) and section 527 of EISA (42 U.S.C. § 17143); Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management, 72 Fed. Reg. 3,919 (Jan. 26, 2007); Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, 74 Fed. Reg. 52,117 (Oct. 5, 2009).

  18. The power professorship program at Washington State University

    International Nuclear Information System (INIS)

    Mosher, C.C.; Shamash, Y.

    1993-01-01

    As with most electric power programs, Washington State University's has existed since the beginning of the engineering program 100 years ago. It has grown and developed largely through the efforts of a few dedicated individuals. The Power Professorship Program has existed since 1972. The Power Professor has been Dr. Clifford C. Mosher until his recent semi-retirement. The Power Professorship was conceived of as an avenue for joint university-industry interaction. Considerable time and ingenuity by visionary engineers and others have resulted in development of a financial base for the Power Professorship Program. The program has been funded equally by public and investor-utility sectors. Following financial difficulties stemming from the Washington Public Power Supply System financial default on public utility bonds for several nuclear projects, funding for the program from the public sector was canceled. After several lean years, public-sector support was again restored by WSU's electrical engineering department offering a contract for services to the utilities in exchange for funding. This contract has been renewed annually, with costs and benefits firmly established through careful analysis and consultation. Problems facing the power industry in the early 1970s with regard to establishing a pipeline of future human resources, were almost identical with those of the present time: indifferent feelings about the industry in general, students being attracted to more glamorous disciplines, and a decline in educational opportunities available in the power area. A 1985 article in the IEEE Power Engineering Review describing today's declining enrollment in power engineering applies equally well to previous periods. A major driving force for initiating utility-industry participation in the Power Professorship Program was the concern for maintaining a source of entry-level engineers with a background in power engineering

  19. Dewitt Wallace-Reader's Digest Fund National Library Power Program.

    Science.gov (United States)

    School Library Media Annual (SLMA), 1993

    1993-01-01

    Describes the National Library Power Program, a collaborative effort sponsored by the Dewitt Wallace-Reader's Digest Fund in cooperation with local education funds and public school districts that was designed to create public elementary and middle school library programs that are central to the education program of the school. (LRW)

  20. 75 FR 78730 - Federal Housing Administration (FHA): Notice of FHA PowerSaver Home Energy Retrofit Loan Pilot...

    Science.gov (United States)

    2010-12-16

    ... Administration (FHA): Notice of FHA PowerSaver Home Energy Retrofit Loan Pilot Program: Extension of Period... proposal to conduct an FHA Home Energy Retrofit Loan Pilot Program (Retrofit Pilot Program or Pilot Program... Efficient Mortgage Innovation pilot program targeted to the single family housing market, and the Retrofit...

  1. 77 FR 45592 - Notice of Submission for OMB Review; Federal Student Aid; Federal Perkins Loan Program Master...

    Science.gov (United States)

    2012-08-01

    ... loans for eligible students to pay the costs of a student's attendance at an eligible institution of... DEPARTMENT OF EDUCATION Notice of Submission for OMB Review; Federal Student Aid; Federal Perkins... technology. Please note that written comments received in response to this notice will be considered public...

  2. Satellite Power System (SPS) Program Summary

    Energy Technology Data Exchange (ETDEWEB)

    1978-12-01

    The joint DOE/NASA SPS program has as its objective to achieve by the end of 1980 an initial understanding of the technical feasibility, economic practicability, and the social and environmental acceptability of the SPS concepts so that recommendations concerning program continuation can be made. The four major study areas include (1) systems definition; (2) environmental assessment; (3) societal assessment; and (4) comparative assessment of alternative energy systems. All the projects on the SPS program are listed and summarized for FY 1978. (WHK)

  3. Programs and resources for control of job stress in the Federal workplace

    Science.gov (United States)

    Joice, Wendell

    1993-01-01

    A couple of weeks ago, the American Psychological Association and the National Institute of Occupational Safety and Health held a conference in Washingtion, D.C. entitled 'Stress in the 90's'. At this conference the Office of Personnel Management (OPM) conducted a session on 'Programs and Resources for the Control of Job Stress in the Federal Workplace'. I am going to present an overview of that three-hour session and some related information from the conference. My discussion covers stress terminology and models, selected programs and resources, evaluation research, some concerns about our progress, and plans to expand our efforts at OPM.

  4. A Dynamic Programming based method for optimizing power system restoration with high wind power penetration

    DEFF Research Database (Denmark)

    Hu, Rui; Hu, Weihao; Li, Pengfei

    2016-01-01

    and relatively low cost. Thus, many countries are increasing the wind power penetration in their power system step by step, such as Denmark, Spain and Germany. The incremental wind power penetration brings a lot of new issues in operation and programming. The power system sometimes will operate close to its...... stable limits. Once the blackout happens, a well-designed restoration strategy is significant. This paper focuses on how to ameliorate the power system restoration procedures to adapt the high wind power penetration and how to take full advantages of the wind power plants during the restoration....... In this paper, the possibility to exploit the stochastic wind power during restoration was discussed, and a Dynamic Programming (DP) method was proposed to make wind power contribute in the restoration rationally as far as possible. In this paper, the method is tested and verified by a modified IEEE 30 Buses...

  5. Status of the Virginia Power/DOE Cooperative Cask Testing/Demonstration Program: A video presentation

    International Nuclear Information System (INIS)

    McKinnon, M.A.; Creer, J.M.; Collantes, C.E.

    1990-01-01

    This paper is documentation of a video presentation and provides a brief summary of the Virginia power/US Department of Energy Cooperative Cask Testing/Demonstration Program. The program consists of two phases. The first phase has been completed and involved the unlicensed performance testing (heat transfer and shielding) of three metal spent fuel storage casks at the federally owned Idaho National Engineering Laboratory. The second phase is ongoing and consists of licensed demonstrations of standard casks from two different vendors and of one or two enhanced capacity casks. 6 refs., 1 tab

  6. UMTRA project office federal employee occupational safety and health program plan

    International Nuclear Information System (INIS)

    1994-06-01

    This document establishes the Federal Employee Occupational Safety and Health (FEOSH) Program for the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project Office. This program will ensure compliance with applicable requirements of DOE Order 3790.1B and DOE Albuquerque Operations Office (AL) Order 3790.lA. FEOSH Program responsibilities delegated by the DOE-AL to the UMTRA Project Office by AL Order 3790.1A also are assigned. The UMTRA Project Office has developed the UMTRA Project Environmental, Safety, and Health (ES ampersand H) Plan (DOE, 1992), which establishes the basic programmatic ES ampersand H requirements for all participants on the UMTRA Project. The ES ampersand H plan is designed primarily to cover remedial action activities at UMTRA sites and defines the ES ampersand H responsibilities of both the UMTRA Project Office and its contractors. The UMTRA FEOSH Program described herein is a subset of the overall UMTRA ES ampersand H program and covers only federal employees working on the UMTRA Project

  7. Interwoven support: an historical survey of US federal programs enabling immunization.

    Science.gov (United States)

    Dalrymple, Dack W; Grabenstein, John D

    2014-11-28

    The US Government (USG) can date its involvement with immunization to military and civilian efforts in 1777 and 1813 to prevent smallpox. USG involvement began accelerating with federal licensing of vaccine and antibody manufacturers in 1903. In addition to ongoing regulation of manufacturing and product quality, military and civilian arms of the USG have led research efforts into new or improved vaccines. These efforts have included diseases endemic in the United States, as well as medical countermeasures targeted against biological weapons, influenza pandemics, and emerging infectious diseases. Especially since the 1950s, the USG has provided increasing levels of funding to purchase vaccines and conduct vaccination programs. These programs have focused largely on children, although vaccination programs for adults have been expanded somewhat in recent years. Multiple agencies of the USG have convened various panels of accomplished external experts who have generated widely regarded recommendations on vaccine safety and efficacy and optimal immunization practices. USG programs for safety assessment, injury compensation, liability protection, and disease surveillance have been developed to assess needs, evaluate safety questions, ensure vaccine supply, and foster confidence in vaccination efforts. Debates on the extent of government involvement date back to the 1890 s and continue today. Several pivotal expansions of government involvement followed disease outbreaks or manufacturing accidents. This historical survey describes each of the major US federal programs in these categories, including references to applicable law. Copyright © 2014 Elsevier Ltd. All rights reserved.

  8. Programs and experiences in electric power conservation

    International Nuclear Information System (INIS)

    Jintao, X.

    1989-01-01

    The report presents a brief introduction of the present situation and future prospects of the energy and power sector in China. Since 1979, China has been carrying out the new economic policies, the national economy has grown rapidly but somewhat out of step with the production of energy and power which has appeared to be shortfall in most parts of the Country and become more and more an obstacle to the economic development. To solve this problem, we have launched an ambitious programme to promote the production of energy and power on one hand, and to implement strict conservation measures on the other. In this regard, international technical and economical cooperation is imperative. (author)

  9. Solid State Power Controller Fuse Development Program.

    Science.gov (United States)

    1983-10-01

    4NYP Appendix A nic =,-, ’XW LX, nII4CD1AFam" CC,’AP44 257-290 TABLE I - FAULT CURRENT TRIP TJMWS Fa’ Ii AC Volts Seconds Rema:ks 1. 1.6 100Z 234.0 417.0...calibration date: 12 July 1983 Biddle Power Rheostat, 1000 W, Cat. No. 20 4.2 Procedure Testing was accomplished in two lots, one consisting of the SPC-2A and...Last calibration date: 12 July 1983 Biddle 100dW Power Rheostat, Cat. No. 20 Variac, Environ No. 380-503 4.2 Procedure The test specimens were suspended

  10. 77 FR 28360 - Applications for New Awards; Training Program for Federal TRIO Programs

    Science.gov (United States)

    2012-05-14

    ... management and financial planning skills, and basic economic decision making skills. Number of expected... financial aid from programs assisted under Title IV of the HEA and from other programs; college and university admissions policies and procedures; and proven strategies to improve the financial literacy and...

  11. Seminar Neutronika-2012. Neutron-physical problems of nuclear-power engineering. Program and abstracts

    International Nuclear Information System (INIS)

    2012-01-01

    On October, 30 - November, 2 in State Scientific Center of the Russian Federation - Institute for Physics and Power Engineering named after A.I. Leypunsky a seminar Neutron-physical problems of nuclear power engineering - Neutronika-2012 took place. On the seminar the following problems were discussed: justification of neutron-physical characteristics of reactor facilities and innovation projects; constant support of neutron-physical calculations of nuclear power installations; numerical simulation during solving reactor physics problems; simulation of neutron-physical processes in reactor facilities by Monte Carlo method; development and verification of programs for reactor facilities neutron-physical calculations; algorithms and programs for solving nonstationary problems of neutron-physical calculation of nuclear reactors; analysis of integral and reactor experiments, experimental database; justification of nuclear and radiation safety of fuel cycle [ru

  12. Radiation Monitoring - A Key Element in a Nuclear Power Program

    International Nuclear Information System (INIS)

    Hussein, A.S.; El-dally, T.A.

    2008-01-01

    For a nuclear power plant, radiation is especially of great concern to the public and the environment. Therefore, a radiation monitoring program is becoming a critical importance. This program covers all phases of the nuclear plant including preoperational, normal operation, accident and decommissioning. The fundamental objective of radiation monitoring program is to ensure that the health and safety of public inside and around the plant and to confirm the radiation doses are below the dose limits for workers and the public. This paper summarizes the environmental radiation monitoring program for a nuclear power plant

  13. Programmed system for nuclear power plant protection

    International Nuclear Information System (INIS)

    Jover, Pierre.

    1980-06-01

    The progress in the field of microprocessors and large scale integration circuits, have incited to introduce this new technologies into nuclear power plant protection system. The hardware and software design principles are briefly listed; then, a quad-redundant protection system for 1300 MWe PWR, developed in France is described [fr

  14. Research, Monitoring, and Evaluation for the Federal Columbia River Estuary Program

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Diefenderfer, Heida L.; Ebberts, Blaine D.; Tortorici, Cathy; Yerxa, Tracey; Leary, J.; Skalski, John R.

    2008-02-05

    The purpose ofthis document is to describe research, monitoring, and evaluation (RME) for the Federal Columbia River Estuary Program. The intent of this RME effort is to provide data and information to evaluate progress toward meeting program goals and objectives and support decision-making in the Estuary Program. The goal of the Estuary Program is to understand, conserve, and restore the estuary ecosystem to improve the performance of listed salmonid populations. The Estuary Program has five general objectives, designed to fulfill the program goal, as follows. 1. Understand the primary stressors affecting ecosystem controlling factors, such as ocean conditions and invasive species. 2. Conserve and restore factors controlling ecosystem structures and processes, such as hydrodynamics and water quality. 3. Increase the quantity and quality of ecosystem structures, i.e., habitats, juvenile salmonids use during migration through the estuary. 4. Maintain the food web to benefit salmonid performance. 5. Improve salmonid performance in terms of life history diversity, foraging success, growth, and survival. The goal of estuary RME is to provide pertinent and timely research and monitoring information to planners, implementers, and managers of the Estuary Program. In conclusion, the estuary RME effort is designed to meet the research and monitoring needs of the estuary Program using an adaptive management process. Estuary RME's success and usefulness will depend on the actual conduct of adaptive management, as embodied in the objectives, implrementation, data, reporting, and synthesis, evaluation, and decision-making described herein.

  15. Inventory of power plants in the United States. [By state within standard Federal Regions, using county codes

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-12-01

    The purpose of this inventory of power plants is to provide a ready reference for planners whose focus is on the state, standard Federal region, and/or national level. Thus the inventory is compiled alphabetically by state within standard Federal regions. The units are listed alphabetically within electric utility systems which in turn are listed alphabetically within states. The locations are identified to county level according to the Federal Information Processing Standards Publication Counties and County Equivalents of the States of the United States. Data compiled include existing and projected electrical generation units, jointly owned units, and projected construction units.

  16. Nuclear power programs in the world's developed and developing countries

    International Nuclear Information System (INIS)

    Czibolya, L.

    1983-01-01

    The significance of nuclear power in the world's energy balance related to fossile energy sources is discussed. The general trend of declination of the national power programs could be observed from the seventies as a result of the oil crisis and the economic recession. The main features of the national energy programs including the ratio of the different energy sources in the power supply, the distribution of power production among the different types of nuclear reactors, the time schedules of the national nuclear power programs are reviewed through the examples of some developed and developing countries: USA, FRG, Canada, Japan, France, Sweden, the Soviet Union, Czechoslovakia, Bulgaria, Hungary, Romania, India, and the Republic of Korea. (V.N.)

  17. Compliance audits in the federal funds programs of the municipalities of Puerto Rico

    Directory of Open Access Journals (Sweden)

    Dennis M. López

    2011-10-01

    Full Text Available The municipalities of the Commonwealth of Puerto Rico are eligible to receive funds from the federal government of the United States. This study presents a descriptive discussion of the federal funding received by these municipalities during fiscal years 2005 to 2009. The findings of the audits performed in connection with these funds are also discussed. The results indicate that the municipalities in the sample received an average of $8.2 million a year in federal funding. The municipality of San Juan, the capital city of Puerto Rico, received an average of $126.5 million a year and was largest recipient of federal funds during the sample period. The results also indicate that 72.99 percent of the audits disclosed reportable conditions and 31.02 percent disclosed material weaknesses. In addition,auditors issued a qualified opinion report on 33.69 percent of the conducted audits. Lastly, 53.15 percent of all audited funds are associated with programs that disclosed audit findings.

  18. The program of reactors and nuclear power plants

    International Nuclear Information System (INIS)

    Calabrese, Carlos R.

    2001-01-01

    Into de framework of the program of research reactors and nuclear power plants, the operating Argentine reactors are described. The uses of the research reactors in Argentina are summarized. The reactors installed by Argentina in other countries (Peru, Algeria, Egypt) are briefly described. The CAREM project for the design and construction of an innovator small power reactor (27 MWe) is also described in some detail. The next biennial research and development program for reactor is briefly outlined

  19. Federal Employees Health Benefits and Federal Employees Dental and Vision Insurance Programs' Coverage Exception for Children of Same-Sex Domestic Partners. Interim final rule.

    Science.gov (United States)

    2016-12-02

    This action amends the rule to create a regulatory exception that allows children of same-sex domestic partners living overseas to maintain their Federal Employees Health Benefits (FEHB) and Federal Employees Dental and Vision Program (FEDVIP) coverage until September 30, 2018. Due to a recent Supreme Court decision, as of January 1, 2016, coverage of children of same-sex domestic partners under the FEHB Program and FEDVIP will generally only be allowed if the couple is married, as discussed in Benefits Administration Letter (BAL) 15-207 dated October 5, 2015. OPM recognizes there are additional requirements placed on overseas federal employees that may not apply to other civilian employees with duty stations in the United States making it difficult to travel to the United States to marry same-sex partners.

  20. Federal Educational Assistance Programs Available to Service Members: Program Features and Recommendations for Improved Delivery

    Science.gov (United States)

    2015-01-01

    results suggest a need to modify the original program design or the logic model (W.K. Kellogg Foundation, 2010). Figure 3.1 outlines the proposed RAND... Kellogg Foundation, 2004). This logic model also illustrates a number of broader impacts. The expectation is that, ultimately, these programs will...Veterans Affairs. W.K. Kellogg Foundation, Using Logic Models to Bring Together Planning, Evaluation, and Action: Logic Model Development Guide

  1. Survey of reportable incidents in nuclear power plants of the Federal Republic of Germany in the year 1991

    International Nuclear Information System (INIS)

    1992-01-01

    In 1991, there were 249 reportable nuclear power plant incidents in Germany (old and new federal Laender). The report comprehensively lists all these incidents. There was no release of radioactivity exceeding the maximum permissible limits, and there were no effects on man or the environment. There were no incidents of reporting category S (Urgent notification), and ten belonging to category E (immediate notification). The six incidents reported in the first half of 1991 from nuclear power plants in the new federal Laender all belonged to category AE 3, which is the lowest. (orig./DG) [de

  2. Comparative Analysis of the Specifications on the Power Quality of the European Union and the Russian Federation

    Science.gov (United States)

    Ded, A. V.; Maltsev, V. N.; Sikorski, S. P.

    2018-04-01

    Since July 2014 the interstate standard GOST 32144-2013 is the only document that defines standard requirements for the power quality in the territory of the Russian Federation. The new standard preamble specifies that this document considers the requirements of the European regional standard EN 50160-2010. However, GOST authors established the degree of standards conformity as nonequivalent. In connection with Russia's accession to the World Trade Organization (WTO) all requirements for goods including electric energy should correspond the international standard requirements. The article analyzes the above standard requirements and assesses the requirements for the power quality standards used in the European Union and in the Russian Federation.

  3. Impacts of Federal Tax Credit Extensions on Renewable Deployment and Power Sector Emissions

    Energy Technology Data Exchange (ETDEWEB)

    Mai, Trieu [National Renewable Energy Lab. (NREL), Golden, CO (United States); Cole, Wesley [National Renewable Energy Lab. (NREL), Golden, CO (United States); Lantz, Eric [National Renewable Energy Lab. (NREL), Golden, CO (United States); Marcy, Cara [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sigrin, Benjamin [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-02-01

    Federal tax credits for renewable energy (RE) have served as one of the primary financial incentives for RE deployment over the last two decades in the United States. In December 2015, the wind power production tax credit and solar investment tax credits were extended for five years as part of the Consolidated Appropriations Act of 2016. This report explores the impact that these tax credit extensions might have on future RE capacity deployment and power sector carbon dioxide (CO2) emissions. The analysis examines the impacts of the tax credit extensions under two distinct natural gas price futures as natural gas prices have been key factors in influencing the economic competitiveness of new RE development. The analysis finds that, in both natural gas price futures, RE tax credit extensions can spur RE capacity investments at least through the early 2020s and can help lower emissions from the U.S. electricity system. More specifically, the RE tax credit extensions are estimated to drive a net peak increase of 48-53 GW in installed RE capacity in the early 2020s -- longer term impacts are less certain. In the longer term after the tax credits ramp down, greater RE capacity is driven by a combination of assumed RE cost declines, rising fossil fuel prices, and other clean energy policies such as the Clean Power Plan. The tax credit extension-driven acceleration in RE capacity development can reduce fossil fuel-based generation and lower electric sector CO2 emissions. Cumulative emissions reductions over a 15-year period (spanning 2016-2030) as a result of the tax credit extensions are estimated to range from 540 to 1420 million metric tonnes CO2. These findings suggest that tax credit extensions can have a measurable impact on future RE deployment and electric sector CO2 emissions under a range of natural gas price futures.

  4. DYNAMIC PROGRAMMING – EFFICIENT TOOL FOR POWER SYSTEM EXPANSION PLANNING

    Directory of Open Access Journals (Sweden)

    SIMO A.

    2015-03-01

    Full Text Available The paper isfocusing on dynamic programming use for power system expansion planning (EP – transmission network (TNEP and distribution network (DNEP. The EP problem has been approached from the retrospective and prospective point of view. To achieve this goal, the authors are developing two software-tools in Matlab environment. Two techniques have been tackled: particle swarm optimization (PSO and genetic algorithms (GA. The case study refers to Test 25 buses test power system developed within the Power Systems Department.

  5. Structural optimization of static power control programs of nuclear power plants with WWER-1000

    International Nuclear Information System (INIS)

    Kokol, E.O.

    2015-01-01

    The question of possibility the power control programs switching for WWER-1000 is considered. The aim of this research is to determine the best program for the power control of nuclear reactor under cyclic diurnal behavior of electrical generation, as well as the switching implementation. The considered problem of finding the best control program refers to the multicriteria optimization class of problems. Operation of the nuclear power generation system simulated using the following power control programs: with constant average temperature of transfer fluid, with constant pressure in the reactor secondary circuit, with constant temperature in input of the nuclear reactor. The target function was proposed. It consists of three normalized criteria: the burn up fraction, the damage level of fuel rod array shells, as well as changes in the power values. When simulation of the nuclear power generation system operation within the life was done, the values of the selected criteria were obtained and inserted in the target function. The minimum of three values of the target function depending on the control program at current time defined the criterion of switching of considered static power control programs for nuclear power generation system

  6. A thermonuclear fusion power program for Israel

    International Nuclear Information System (INIS)

    Friedman, Bruce

    1985-01-01

    Although lacking in financial and physical resources, Israel has a large base of scientific and technological talent that can be organized for the purpose of producing commercial fusion power reactors, thus allowing Israel to attain energy independence and acquiring a monetary inflow through royalties and reactor export. The limited partnership would be suitable for financing a significant portion of the project. Economic feasibility can be estimated through the use of one or more of the approaches supplied by the calculus of variations, cardinal utility theory, catastrophe theory, and noncooperative game theory. (author)

  7. Pulse Power--A Heart Physiology Program for Children.

    Science.gov (United States)

    Hinson, Curt

    1994-01-01

    Primary grade students at a Delaware elementary school currently participate in the Pulse Power heart physiology program. Students receive mastery instruction and use heart monitors to exercise performance throughout the 6-phase program. Data from homework and from the heart monitors identify student progress, knowledge, and cardiovascular…

  8. 41 CFR 301-73.2 - What are our responsibilities as participants in the Federal travel management program?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 4 2010-07-01 2010-07-01 false What are our responsibilities as participants in the Federal travel management program? 301-73.2 Section 301-73.2 Public Contracts and Property Management Federal Travel Regulation System TEMPORARY DUTY (TDY) TRAVEL ALLOWANCES...

  9. Who Does Not Benefit from Federal and State Financial Aid Programs? Information Brief. Volume 7, Issue 3

    Science.gov (United States)

    Florida Board of Governors, State University System, 2009

    2009-01-01

    This brief presents statistics showing that many students from middle-income and lower-income Florida families do not qualify for federal or state grants and scholarships, and that nearly half of state university system middle- and lower-income families do not receive benefits from federal or state financial aid programs. (Contains technical…

  10. Integrated energy and climate program without nuclear power

    International Nuclear Information System (INIS)

    Haller, W.

    2007-01-01

    Under the German EU Council presidency, the European Union adopted an ambitious climate protection program in spring this year which has consequences for the entire energy sector. A fair system of burden sharing is currently being sought on the level of the European Union. However, the German federal government does not wait for that agreement to be reached, but has added to the clearcut EU plans in order to achieve more climate protection. At the closed meeting of the federal cabinet in Meseberg on August 23-24, 2007, the key points of an integrated energy and climate program were adopted. The unprecedented set of measures comprises 30 points. In many cases, legal measures are required for implementation, which implies a heavy workload facing the federal government and parliament. A major step forward is seen in the federal government's intention to preserve the international competitiveness of the producing sector and energy-intensive industries also under changed framework conditions. The imperative guiding principle must be that care should take precedence over speed. European or worldwide solutions must be found for all measures, be it energy efficiency or climate protection, and all countries must be involved because, otherwise, specific measures taken by individual states will be ineffective. (orig.)

  11. The Russian Federation's Ministry of Atomic Energy: Programs and Developments

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Craig M.

    2000-07-24

    The Ministry of Atomic Energy of the Russian Federation (Minatom) is one of Russia's largest and most influential federal bodies. Throughout 1999 its head, Yevgeny Adamov, has worked to increase the Ministry's commercial competitiveness by consolidating redundant facilities and tightening control over subsidiary organizations. Economic difficulties and budget constraints, however, have hindered Minatom's ability to achieve many of its programs and goals. As a result, the Ministry has continued, renewed or initiated contracts with several countries possessing questionable commitments to nonproliferation and has sought to expand its role in international nuclear waste management and spent fuel reprocessing in order to raise new sources of revenue. While many of these programs are not likely to come to fruition, others raise significant nonproliferation and environmental concerns. This paper reviews select programs driving Minatom's efforts to raise funds, comments on their potential viability, and highlights areas likely to be of particular concern for the United States over the next three to five years.

  12. Quality Assurance Program Plan Waste Management Federal Services of Hanford, Inc

    International Nuclear Information System (INIS)

    VOLKMAN, D.D.

    1999-01-01

    This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program

  13. India's power program and its concern over environmental safety

    International Nuclear Information System (INIS)

    Prasad, G.E.; Mittra, J.

    2001-01-01

    India's need of electrical power is enormous and per capita consumption of power is to be increased at least by ten times to reach the level of world average. Thermal Power generation faces two fold problems. First, there is scarcity of good quality fuel and second, increasing environmental pollution. India's self reliant, three stage, 'closed-fuel-cycle' nuclear power program is promising better solution to the above problems. To ensure Radiation Protection and Safety of Radiation Sources, Indian Nuclear Power program emphasizes upon design and engineering safety by incorporating necessary safety features in the design, operational safety through structured training program and typically through software packages to handle rare unsafe events and regulation by complying safety directives. A health survey among the radiation workers indicates that there is no extra threat to the public from nuclear power program. Based on latest technology, as available in case of nuclear power option, it is quite possible to meet high energy requirement with least impact on the environment.. (authors)

  14. India's power programs and its concern over environmental safety

    International Nuclear Information System (INIS)

    Prasad, G.E.; Mittra, J.; Sarma, M.S.R.

    2000-01-01

    India's need for electrical power is enormous and per capita consumption of power is to be increased at least by 10 times to reach the level of the world average. Thermal power generation faces two-fold problems. First, there is scarcity of good quality fuel and second, increasing environmental pollution. India 's self reliant, . three stage, 'closed-fuel-cycle' nuclear power program is promising a better solution to the above problems. To ensure Radiation Protection and Safety of Radiation Sources, the Indian Nuclear Power program emphasizes upon design and engineering safety by incorporating' necessary safety features in the design, operational safety through a structured training program and typically through software packages to handle rare unsafe events and regulation by complying safety directives. A health survey among the radiation workers indicates that there is no extra threat to the public from the nuclear power program. Based on the latest technology, as available in case of the nuclear power option, it is quite possible to meet high energy requirements with least impact on the environment. (authors)

  15. The Programming Power of the Placenta

    Science.gov (United States)

    Sferruzzi-Perri, Amanda N.; Camm, Emily J.

    2016-01-01

    Size at birth is a critical determinant of life expectancy, and is dependent primarily on the placental supply of nutrients. However, the placenta is not just a passive organ for the materno-fetal transfer of nutrients and oxygen. Studies show that the placenta can adapt morphologically and functionally to optimize substrate supply, and thus fetal growth, under adverse intrauterine conditions. These adaptations help meet the fetal drive for growth, and their effectiveness will determine the amount and relative proportions of specific metabolic substrates supplied to the fetus at different stages of development. This flow of nutrients will ultimately program physiological systems at the gene, cell, tissue, organ, and system levels, and inadequacies can cause permanent structural and functional changes that lead to overt disease, particularly with increasing age. This review examines the environmental regulation of the placental phenotype with particular emphasis on the impact of maternal nutritional challenges and oxygen scarcity in mice, rats and guinea pigs. It also focuses on the effects of such conditions on fetal growth and the developmental programming of disease postnatally. A challenge for future research is to link placental structure and function with clinical phenotypes in the offspring. PMID:27014074

  16. Advanced power electronics and electric machinery program

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2007-12-01

    The U.S. Department of Energy (DOE) and the U.S. Council for Automotive Research (composed of automakers Ford, General Motors, and Chrysler) announced in January 2002 a new cooperative research effort. Known as "FreedomCAR" (derived from "Freedom" and "Cooperative Automotive Research"), it represents DOE's commitment to developing public/private partnerships to fund high-risk, high-payoff research into advanced automotive technologies. Efficient fuel cell technology, which uses hydrogen to power automobiles without air pollution, is a very promising pathway to achieving the ultimate vision. The new partnership replaces and builds upon the Partnership for a New Generation of Vehicles initiative that ran from 1993 through 2001.

  17. 25 CFR 47.11 - Can these funds be used as matching funds for other Federal programs?

    Science.gov (United States)

    2010-04-01

    ... EDUCATION UNIFORM DIRECT FUNDING AND SUPPORT FOR BUREAU-OPERATED SCHOOLS § 47.11 Can these funds be used as matching funds for other Federal programs? A Bureau-operated school may use funds that it receives under...

  18. Household food insecurity and dietary intake among Mexican-American women participating in federal food assistance programs

    Science.gov (United States)

    This study explored the association between food insecurity and dietary intake among Mexican-American women after controlling for sociocultural and economic factors including participation in federal food assistance programs. A cross-sectional design was used. Demographics, anthropometrics, accultur...

  19. Federal Employees Health Benefits Program: Enrollment Options Following the Termination of a Plan or Plan Option. Final rule.

    Science.gov (United States)

    2015-10-28

    The U.S. Office of Personnel Management (OPM) is issuing a final rule to amend the Federal Employees Health Benefits (FEHB) Program regulations regarding enrollment options following the termination of a plan or plan option.

  20. Genesis of the Brazilian nuclear power plants program

    International Nuclear Information System (INIS)

    Syllus, G.; Lepecki, W.

    1996-01-01

    The genesis of the Brazilian Nuclear Power Program is described by the authors - who participated in the events - from the beginning of the sixties, until the definition and the start of the implementation in 1975 of the Reference Nuclear Power Program. A description is made of the main events, studies and decisions that contributed to the evolution of the Program: the GTRP (Nuclear Power Plant Working Group); the Thorium Group; the Lane Group; the decision about Angra 1; CNEN's analyses about the reactor line and, finally, the creation of CBTN (Nuclear Technology Brazilian Company), which elaborated the studies that resulted in the final definition of the Program and led to the Brazilian German Agreement and the establishment of NUCLEBRAS. (author)

  1. Bibliography of the Maryland Power Plant Research Program, fourteenth edition

    International Nuclear Information System (INIS)

    McLean, R.I.

    1993-02-01

    The Power Plant Siting Act of 1971 (Sec. 3-303) established the Power Plant Research Program to ensure that demands for electric power would be met in a timely manner at a reasonable cost while assuring that the associated environmental impact would be acceptable. The scope of the Program extends to estimating the impact of proposed new generating facilities, evaluating the acceptability of proposed transmission line routes, assessing the impact of existing generation facilities, and investigating generic issues related to power plant site evaluation and associated environmental and land use considerations. The bibliography is a compilation of all the studies performed for and/or by the Power Plant and Environmental Review Division since its inception

  2. Bibliography of the Maryland Power Plant Research Program, Thirteenth Edition

    International Nuclear Information System (INIS)

    McLean, R.I.

    1992-02-01

    The Power Plant Siting Act of 1971 (Sec. 3-303) established the Power Plant Research Program to insure that demands for electric power would be met in a timely manner at a reasonable cost while assuring that the associated environmental impact would be acceptable. The scope of the Program extends to estimating the impact of proposed new generating facilities, evaluating the acceptability of proposed transmission line routes, assessing the impact of existing generation facilities, and investigating generic issues related to power plant site evaluation and associated environmental and land use considerations. The bibliography is a compilation of all the studies performed for and or by the Power Plant and Environmental Review Division since its inception. Reports published by the Division considered to be of general interest are routinely made available through the National Technical Information Service. Those reports so registered may be identified by the NTIS accession number immediately following the citation in the bibliography

  3. Oak Ridge Reservation Federal Facility Agreement for the Environmental Restoration Program. Volume 4

    International Nuclear Information System (INIS)

    1993-10-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered is July through September 1993 (fourth quarter of FY 1993). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments

  4. How does the employer contribution for the federal employees health benefits program influence plan selection?

    Science.gov (United States)

    Florence, Curtis S; Thorpe, Kenneth E

    2003-01-01

    Market reform of health insurance is proposed to increase coverage and reduce growth in spending by providing an incentive to choose low-cost plans. However, having a choice of plans could result in risk segmentation. Risk-adjusted payments have been proposed to address risk segmentation but are criticized as ineffective. An alternative to risk adjustment is to subsidize premiums, as in the Federal Employees Health Benefits Program (FEHBP). Subsidizing premiums may also increase total premium spending. We find that there is little risk segmentation in the FEHBP and that reducing the premium subsidy would lower government premium spending and slightly increase risk segmentation.

  5. The program for Central and Eastern Europe organized by the German Federal Ministry for the Environment

    International Nuclear Information System (INIS)

    Gelfort, E.; Wolf, J.; Weil, L.

    1996-01-01

    One of the main objectives of the German Federal Ministry for the Environment, within the overall concept of the Federal Government to help establish democracy and a social market economy in Eastern Europe, is to contribute to improving the safety of nuclear power plants. Safety evaluations of Soviet-type reactors in the former German Democratic Republic have given rise to findings since 1990 which resulted in qualified cooperation especially in Russia and Ukraine. These activities mainly serve to strengthen the role of supervisory authorities in the interest of nuclear safety, and to make available technical inspection systems for nuclear power plants. German experts also conducted safety analyses and radioactivity measurements in situ. The financial expenditure between 1990 and 1995 totaled approx. DM 150 million. The money was spent on some 75 different projects for which contracts were awarded to qualified German firms. All measures, from analyses to the provision of equipment to training seminars, serve the purpose of providing help towards self-help, together with an adequate transfer of know-how. (orig.) [de

  6. Nature as capital: Advancing and incorporating ecosystem services in United States federal policies and programs.

    Science.gov (United States)

    Schaefer, Mark; Goldman, Erica; Bartuska, Ann M; Sutton-Grier, Ariana; Lubchenco, Jane

    2015-06-16

    The concept of nature as capital is gaining visibility in policies and practices in both the public and private sectors. This change is due to an improved ability to assess and value ecosystem services, as well as to a growing recognition of the potential of an ecosystem services approach to make tradeoffs in decision making more transparent, inform efficient use of resources, enhance resilience and sustainability, and avoid unintended negative consequences of policy actions. Globally, governments, financial institutions, and corporations have begun to incorporate natural capital accounting in their policies and practices. In the United States, universities, nongovernmental organizations, and federal agencies are actively collaborating to develop and apply ecosystem services concepts to further national environmental and economic objectives. Numerous federal agencies have begun incorporating these concepts into land use planning, water resources management, and preparations for, and responses to, climate change. Going forward, well-defined policy direction will be necessary to institutionalize ecosystem services approaches in federal agencies, as well as to guide intersector and interdisciplinary collaborative research and development efforts. In addition, a new generation of decision support tools are needed to further the practical application of ecosystem services principles in policymaking and commercial activities. Improved performance metrics are needed, as are mechanisms to monitor the status of ecosystem services and assess the environmental and economic impacts of policies and programs. A greater national and international financial commitment to advancing ecosystem services and natural capital accounting would likely have broad, long-term economic and environmental benefits.

  7. Nuclear Power Plant Fire Protection Research Program

    International Nuclear Information System (INIS)

    Datta, A.

    1985-07-01

    The goal is to develop test data and analytical capabilities to support the evaluation of: (1) the contribution of fires to the risk from nuclear power plants; (2) the effects of fires on control room equipment and operations; and (3) the effects of actuation of fire suppression systems on safety equipment. A range of fire sources will be characterized with respect to their energy and mass evolution, including smoke, corrosion products, and electrically conductive products of combustion. An analytical method for determining the environment resulting from fire will be developed. This method will account for the source characteristics, the suppression action following detection of the fire, and certain parameters specific to the plant enclosure in which the fire originates, such as the geometry of the enclosure and the ventilation rate. The developing local environment in the vicinity of safety-related equipment will be expressed in terms of temperatures, temperature rise rates, heat fluxes, and moisture and certain species content. The response of certain safe shutdown equipment and components to the environmental conditions will be studied. The objective will be to determine the limits of environmental conditions that a component may be exposed to without impairment of its ability to function

  8. Review of world nuclear power programs

    International Nuclear Information System (INIS)

    Rippon, S.

    1978-01-01

    Political, economic and environmental decisions are still affecting the growth of nuclear power generation throughout the world, but there are signs that proven past performance and increasing prices of energy from conventional sources are becoming overriding factors. In the USA, some uncertainty has been created by the moratorium on reprocessing enacted by the 1978 Non-Proliferation Act. The uncertainty has spread to importers of nuclear fuel and technology, but there is increasing international acceptance of the International Nuclear Fuel Cycle Evaluation. Isotope separation capacity to be installed by the US government, by the joint European organization Urenco and by the French Eurodif should ease the supply of fuel. There is little progress on waste-management policy in the USA, but in Germany a company (DWK) has been formed and a site for a rocksalt repository has been designated at Gorleben. In the UK the Windscale inquiry has a positive significance for nuclear energy generally as well as for reprocessing. An inquiry in Sweden has also come to positive conclusions. The status of nuclear energy in these and a number of other countries is discussed in terms of political and national policies. (N.D.H.)

  9. A preliminary look at the impacts of warming on the federal Columbia River power system

    International Nuclear Information System (INIS)

    Stephan, N.

    2008-01-01

    Studies have indicated that the precipitation changes resulting from climatic warming are unlikely to be distinguishable from natural variability until late in the 21. century. This study presented scenarios and projected changes for the Federal Columbia River power system that used volume and runoff data in monthly time-steps. A streamflow model of data from the previous 44 years was also used. The region is currently meeting 50 per cent of its loads with clean hydro-generation, and is now examining ways of limiting greenhouse gas (GHG) emissions as electricity loads continue to grow. The impacts of climate change were compared with projected loads up to the year 2040. Flow targets for regional fish operations peak between April and July. Volume changes in water as a result of hydroelectricity projects in the region have also been simulated. Monitoring tools and meteorological data were presented as well as watershed run-off data from 1929 to 2008. Policies related to climate change continue to be challenged by both legal and political issues as well as a lack of strategic planning. It was concluded that accurate system modelling is needed to avoid the impacts of costly and un-informed decision-making processes. tabs., figs

  10. Status after 5 Years of Survival Compliance Testing in the Federal Columbia River Power System (FCRPS)

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, John R.; Weiland, Mark A.; Ham, Kenneth D.; Ploskey, Gene R.; McMichael, Geoffrey A.; Colotelo, Alison H.; Carlson, Thomas J.; Woodley, Christa M.; Eppard, M. Brad; Hockersmith, Eric E.

    2016-06-27

    Survival studies of juvenile salmonids implanted with acoustic tags have been conducted at hydroelectric dams within the Federal Columbia River Power System (FCRPS) in the Columbia and Snake rivers between 2010 and 2014 to assess compliance with dam passage survival standards stipulated in the 2008 Biological Opinion (BiOp). For juvenile salmonids migrating downstream in the spring, dam passage survival defined as survival from the upstream dam face to the tailrace mixing zone must be ≥96% and for summer migrants, ≥93%, and estimated with a standard error ≤1.5% (i.e., 95% confidence interval of ±3%). A total of 29 compliance tests have been conducted at 6 of 8 FCRPS main-stem dams, using over 109,000 acoustic-tagged salmonid smolts. Of these 29 compliance studies, 23 met the survival standards and 26 met the precision requirements. Of the 6 dams evaluated to date, individual survival estimates range from 0.9597 to 0.9868 for yearling Chinook Salmon, 0.9534 to 0.9952 for steelhead, and 0.9076 to 0.9789 for subyearling Chinook Salmon. These investigations suggest the large capital investment over the last 20 years to improve juvenile salmon passage through the FCRPS dams has been beneficial.

  11. Report on nuclear power plant control and instrumentation activities in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Bastl, W.

    1986-01-01

    The overall situation in I and C of nuclear power plants in the Federal Republic of Germany can be characterized by three aspects. a) The improvement of man-machine communication by introducing integral information concepts for the control room by means of VDUs. b) Along with a) new data acquisition systems based upon process computers which facilitate the integration of operator aids like alarm analyses, disturbance analyses, post-mortem analyses, etc. c) The penetration of programmable processors into limitation systems in order to provide soft setback measures. d) The transition to I and C systems making use of the new generation of electronic components. The most important step towards advanced control rooms was the development of the Process Information System (PRINS) by KWU, which will be used with the German convoi-plants. The main emphasis regarding further R and D work in the field of operator aids is placed upon expert systems. Work will begin with a two years project aiming at the development of a basic module for a laboratory prototype

  12. Basic Program Elements for Federal employee Occupational Safety and Health Programs and related matters; Subpart I for Recordkeeping and Reporting Requirements. Final rule.

    Science.gov (United States)

    2013-08-05

    OSHA is issuing a final rule amending the Basic Program Elements to require Federal agencies to submit their occupational injury and illness recordkeeping information to the Bureau of Labor Statistics (BLS) and OSHA on an annual basis. The information, which is already required to be created and maintained by Federal agencies, will be used by BLS to aggregate injury and illness information throughout the Federal government. OSHA will use the information to identify Federal establishments with high incidence rates for targeted inspection, and assist in determining the most effective safety and health training for Federal employees. The final rule also interprets several existing basic program elements in our regulations to clarify requirements applicable to Federal agencies, amends the date when Federal agencies must submit to the Secretary of Labor their annual report on occupational safety and health programs, amends the date when the Secretary of Labor must submit to the President the annual report on Federal agency safety and health, and clarifies that Federal agencies must include uncompensated volunteers when reporting and recording occupational injuries and illnesses.

  13. 75 FR 16072 - Fisheries Finance Program; Final Program Notice and Announcement of Availability of Federal...

    Science.gov (United States)

    2010-03-31

    ...NMFS announces the availability of long-term direct loans made underthe Fisheries Finance Program (FFP). The FFP provides financing for the purchase of used vessels or the reconstruction of vessels (limited to reconstructions that do not add to fishing capacity); refinancing for existing debt obligations; financing or refinancing fisheries shoreside facilities or aquacultural facilities; and the purchase or refinancing of Individual Fishing Quota (IFQ) in the North Pacific. FFP loans are not issued for purposes which could contribute to over capitalization of the fishing industry.

  14. 75 FR 29877 - Affordable Housing Program Amendments: Federal Home Loan Bank Mortgage Refinancing Authority

    Science.gov (United States)

    2010-05-28

    ...: Federal Home Loan Bank Mortgage Refinancing Authority AGENCY: Federal Housing Finance Agency. ACTION... Federal Housing Finance Agency (FHFA) to permit the Federal Home Loan Banks (Banks) until July 30, 2010... Mae), Federal Home Loan Mortgage Corporation (Freddie Mac) (collectively, Enterprises), the Banks, and...

  15. Continuity of operations planning in college athletic programs: The case for incorporating Federal Emergency Management Guidelines.

    Science.gov (United States)

    Hall, Stacey A; Allen, Brandon L; Phillips, Dennis

    2016-01-01

    College athletic departments have a responsibility to provide a safe environment for student-athletes; however, most colleges do not have a crisis management plan that includes procedures for displaced student-athletes or alternate facilities to perform athletic events. Continuity of operations planning ensures athletic programs are equipped to maintain essential functions during, or shortly after, a disruption of operations due to possible hazards. Previous studies have identified a lack of emergency preparedness and continuity planning in college athletic departments. The purpose of this article is to illustrate in detail one approach to disaster planning for college athletic departments, namely the Federal Emergency Management Agency (FEMA) continuity of operations framework. By adhering to FEMA guidelines and promoting a best practices model, athletic programs can effectively plan to address potential hazards, as well as protect the organization's brand, image, and financial sustainability after a crisis event.

  16. Analysis of participation in the federally mandated coal workers' health-surveillance program

    International Nuclear Information System (INIS)

    Nickolaus, M.E.

    1987-01-01

    The Federal Coal Mine Health and Safety Act of 1969 required that periodic chest radiographs be offered to underground coal miners to protect the miners from the development of Coal Workers' Pneumoconiosis (CWP) and progression of the disease to progressive massive fibrosis (PMF). These examinations are administered by the National Institute for Occupational Safety and Health (NIOSH) through the Coal Workers' Health Surveillance Program (CWHSP). This study developed rates of participation for each of 558 West Virginia underground coal mines who submitted or had NIOSH assigned plans for making chest radiographs available during the third round, July 1978 through December 1980. These rates were analyzed in relation to desired levels of participation and to reinforcing, predisposing and enabling factors presumed to affect rates of participation in disease prevention and surveillance programs

  17. Effects of expiration of the Federal energy tax credit on the National Photovoltaics Program

    Science.gov (United States)

    Smith, J. L.

    1984-01-01

    Projected 1986 sales are significantly reduced as a direct result of system price increases following from expiration of the Federal energy tax credits. There would be greatly reduced emphasis on domestic electric utility applications. Indirect effects arising from unrealized economies of scale and reduced private investment in PV research and development (R&D) and in production facilities could have a very large cumulative adverse impact on the U.S. PV industry. The industry forecasts as much as fourfold reduction in 1990 sales if tax credits expire, compared with what sales would be with the credits. Because the National Photovoltaics Program is explicitly structured as a government partnership, large changes in the motivation or funding of either partner can affect Program success profoundly. Reduced industry participation implies that such industry tasks as industrialization and new product development would slow or halt. Those research areas receiving heavy R&D support from private PV manufacturers would be adversely affected.

  18. The cost and impact of the interim federal health program cuts on child refugees in Canada.

    Science.gov (United States)

    Evans, Andrea; Caudarella, Alexander; Ratnapalan, Savithiri; Chan, Kevin

    2014-01-01

    On June 30, 2012, Interim Federal Health Program (IFHP) funding was cut for refugee claimant healthcare. The potential financial and healthcare impacts of these cuts on refugee claimants are unknown. We conducted a one-year retrospective chart review spanning 6 months before and after IFHP funding cuts at The Hospital for Sick Children, a tertiary care children's hospital in Toronto. We analyzed emergency room visits characteristics, admission rates, reasons for admission, and financial records including billing from Medavie Blue Cross. There were 173 refugee children visits to the emergency room in the six months before and 142 visits in the six months after funding cuts. The total amount billed to the IFHP program during the one-year of this study was $131,615. Prior to the IFHP cuts, 46% of the total emergency room bills were paid by IFHP compared to 7% after the cuts (pinstitution in the country increased.

  19. Using peer-to-peer energy-trading platforms to incentivize prosumers to form federated power plants

    Science.gov (United States)

    Morstyn, Thomas; Farrell, Niall; Darby, Sarah J.; McCulloch, Malcolm D.

    2018-02-01

    Power networks are undergoing a fundamental transition, with traditionally passive consumers becoming `prosumers' — proactive consumers with distributed energy resources, actively managing their consumption, production and storage of energy. A key question that remains unresolved is: how can we incentivize coordination between vast numbers of distributed energy resources, each with different owners and characteristics? Virtual power plants and peer-to-peer (P2P) energy trading offer different sources of value to prosumers and the power network, and have been proposed as different potential structures for future prosumer electricity markets. In this Perspective, we argue they can be combined to capture the benefits of both. We thus propose the concept of the federated power plant, a virtual power plant formed through P2P transactions between self-organizing prosumers. This addresses social, institutional and economic issues faced by top-down strategies for coordinating virtual power plants, while unlocking additional value for P2P energy trading.

  20. The lack of jurisdiction of one federal Land in other federal Lands over the supervision on investments by electric utilities under art. 4 par. 2 of the Act on the promotion of the power-supply industry

    International Nuclear Information System (INIS)

    Keverkordes, J.

    1983-01-01

    The article discusses the difficulties encountered in State supervision of the energy industry in the Federal Republic of Germany, emanating from the federative structure. Difficulties arise predominantly in cases where an electric power station is to be erected in a federal Land with financial aid of electric utilities from this particular Land and from another Land, with electricity to be supplied to both Lands involved. According to section 4, sub-section (2) of the Act on the promotion of power-supply industry, (EnWG), of 1935 the power station may only be built if it will not adversely affect the common welfare. In case of doubts thereon, protest against such a project has to be filed, which may issue in the project being forbidden. The author concludes that there is no competence of one federal Land to supervise investment by electric utilities of another federal Land. Exclusive competence in this respect lies with the authorities of the Land on whose territory the power station is to be built. Although supervision of investment activities is of superregional importance, the author says that there is no competence of the Federal Government to become active as long as the Government fails to use its rights for establishing a federal office for supervising the power-supply industry. Neither does the atomic energy law governing the licensing of nuclear power stations define any Federal competence in this respect. (HP) [de

  1. Increasing health insurance coverage through an extended Federal Employees Health Benefits Program.

    Science.gov (United States)

    Fuchs, B C

    2001-01-01

    The Federal Employees Health Benefits Program (FEHBP) could be combined with health insurance tax credits to extend coverage to the uninsured. An extended FEHBP, or "E-FEHBP," would be open to all individuals who were not covered through work or public programs and who also were eligible for the tax credits on the basis of income. E-FEHBP also would be open to employees of very small firms, regardless of their eligibility for tax credits. Most plans available to FEHBP participants would be required to offer enrollment to E-FEHBP participants, although premiums would be rated separately. High-risk individuals would be diverted to a separate high-risk pool, the cost of which would be subsidized by the federal government. E-FEHBP would be administered by the states, or if a state declined, by an entity that contracted with the Office of Personnel Management. While E-FEHBP would provide group insurance to people who otherwise could not get it, premiums could exceed the tax-credit amount and some people still might find the coverage unaffordable.

  2. The cost and impact of the interim federal health program cuts on child refugees in Canada.

    Directory of Open Access Journals (Sweden)

    Andrea Evans

    Full Text Available INTRODUCTION: On June 30, 2012, Interim Federal Health Program (IFHP funding was cut for refugee claimant healthcare. The potential financial and healthcare impacts of these cuts on refugee claimants are unknown. METHODS: We conducted a one-year retrospective chart review spanning 6 months before and after IFHP funding cuts at The Hospital for Sick Children, a tertiary care children's hospital in Toronto. We analyzed emergency room visits characteristics, admission rates, reasons for admission, and financial records including billing from Medavie Blue Cross. RESULTS: There were 173 refugee children visits to the emergency room in the six months before and 142 visits in the six months after funding cuts. The total amount billed to the IFHP program during the one-year of this study was $131,615. Prior to the IFHP cuts, 46% of the total emergency room bills were paid by IFHP compared to 7% after the cuts (p<0.001. INTERPRETATION: After the cuts to the IFHP, The Hospital for Sick Children was unable to obtain federal health coverage for the vast majority of refugee claimant children registered under the IFHP. This preliminary analysis showed that post-IFHP cuts healthcare costs at the largest tertiary pediatric institution in the country increased.

  3. Non-power application as an entry point to nuclear power program

    International Nuclear Information System (INIS)

    Nahrul Khair Alang Md Rashid

    2009-01-01

    Nuclear power is usually viewed as the flagship of nuclear technology. A nuclear power plant complex, visible and prominence, is iconic of the technology. That image makes its presence common knowledge to the extent that nuclear technology is equated almost totally with nuclear power by the general public. The downside of this visibility is that it becomes easy target in public misinformation programs. The non-power applications however are not visible, and devoid of icon. The non-power applications, therefore, can grow quite smoothly, attracting only little attention in the negative and in the positive senses. According to a study conducted in the USA in 2000 and in Japan in 2002, the socio-economic impact of non-power and power applications of nuclear technology are comparable. Involvement in non-power applications can be a good grounding for moving into power applications. This paper discusses the non-power nuclear technology applications and in what manner it can serve to prepare the introduction of nuclear power program. (Author)

  4. Oak Ridge Reservation Federal Facility Agreement: Quarterly report for the Environmental Restoration Program. Volume 2, January--March 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This report provides information about ER Program activities conducted on the Oak Ridge Reservation under the Federal Facility Agreement (FFA). Specifically, it includes information on milestones scheduled for completion during the reporting period as well as scheduled for completion during the next reporting period (quarter), accomplishments of the ER Program, concerns related to program work, and scheduled activities for the next quarter. It also provides a listing of the identity and assigned tasks of contractors performing ER Program work under the FFA.

  5. Preliminary results of system emergency program to radiologic events of Distrito Federal; Resultados preliminares do programa de atendimento a eventos de origem radiologica no Distrito Federal

    Energy Technology Data Exchange (ETDEWEB)

    Correa, Rosangela da Silveira; Dias, Cintia Melazo; Nicoli, Ieda Gomes [CNEN, Brasilia, DF (Brazil)

    1997-12-31

    This paper intends to present the program conducted by Comissao Nacional de Energia Nuclear (CNEN) in Brasilia related to the controlling of unusual situations involving radiation sources in Distrito Federal. The CNEN in Brasilia has been working in this program since 1994. In this way people has used two mechanisms to contacted, telephone and pager. In 1994, there was one denunciation, five in 1995 and twenty in 1996. The device found in Distrito Federal were: radioactive lightning rod, dentistry and medical X-rays equipment, smoke detectors, research and toxic material. In a period of three years, 1994 to 1996, the radioactive lightning rod an dentistry and medical X-rays equipment represented seventy per cent of all material found. Distrito Federal has never had a real radiological emergency situation but radiological events because, up to now, it has not have lost of control of a radioactive source. The problem that emerges is a psychological. The radioactive symbol found in the material frightens the population. The results show that an emergency planning is necessary in Distrito Federal once that the events occurred since 1996 represented thirty per cent of all events occurred in national territory. (author) 6 refs., 3 figs.; e-mail: cnenbsb at rio.nutecnet.com.br

  6. 2004 Power marketing program draft environmental impact statement

    International Nuclear Information System (INIS)

    1996-04-01

    The Western Area Power Administration (Western), created in 1977 under the Department of Energy (DOE) Organization Act, markets and transmits electric power throughout 15 western states. Western's Sierra Nevada Customer Service Region (Sierra Nevada Region) markets approximately 1,480 megawatts (MW) of power from the Central Valley Project (CVP) and other sources, and markets available nonfirm energy from the Washoe Project. The Sierra Nevada Region's marketing area is shown in Figure 1. 1. Western's mission is to sell and deliver electricity that is in excess of Project Use (power required for project operations), which for the Sierra Nevada Region is generated from CVP and Washoe Project powerplants. Western's power marketing responsibility includes managing the Federal transmission system. The hydroelectric generation facilities of the CVP are operated by the Bureau of Reclamation (Reclamation). Reclamation manages and releases water in accordance with the various acts authorizing specific projects and with other laws and enabling legislation. Western's capacity and energy sales must be in conformance with the laws that govern its sale of electrical power. Hydropower operations at each facility must comply with minimum and maximum flows and other constraints set by Reclamation, the U.S. Fish and Wildlife Service (the Service), or other regulatory agencies, acting in accordance with law or policy. This EIS describes the environmental consequences of the range of reasonable marketing alternatives that meet the needs and purposes of the proposed marketing plan

  7. Annual report to Congress on Federal Government Energy Management and Conservation Programs Fiscal Year 1999

    Energy Technology Data Exchange (ETDEWEB)

    None

    2001-05-01

    This document provides information on energy consumption in Federal buildings, operations, and vehicles and equipment, and documents activities conducted by Federal agencies to meet the statutory requirements.

  8. Annual Report to Congress on Federal Government Energy Management and Conservation Programs Fiscal Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-11-26

    This document provides information on energy consumption in Federal buildings, operations, and vehicles and equipment, and documents activities conducted by Federal agencies to meet the statutory requirements.

  9. Annual Report to Congress on Federal Government Energy Management and Conservation Programs Fiscal Year 2005

    Energy Technology Data Exchange (ETDEWEB)

    None

    2006-09-26

    This document provides information on energy consumption in Federal buildings, operations, and vehicles and equipment, and documents activities conducted by Federal agencies to meet the statutory requirements.

  10. Annual Report to Congress on Federal Government Energy Management and Conservation Programs Fiscal Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-01-27

    This document provides information on energy consumption in Federal buildings, operations, and vehicles and equipment, and documents activities conducted by Federal agencies to meet the statutory requirements.

  11. Annual Report to Congress on Federal Government Energy Management and Conservation Programs Fiscal Year 2002

    Energy Technology Data Exchange (ETDEWEB)

    None

    2004-09-29

    This document provides information on energy consumption in Federal buildings, operations, and vehicles and equipment, and documents activities conducted by Federal agencies to meet the statutory requirements.

  12. Annual Report to Congress on Federal Government Energy Management and Conservation Programs Fiscal Year 2000

    Energy Technology Data Exchange (ETDEWEB)

    None

    2002-12-13

    This document provides information on energy consumption in Federal buildings, operations, and vehicles and equipment, and documents activities conducted by Federal agencies to meet the statutory requirements.

  13. Annual Report to Congress on Federal Government Energy Management and Conservation Programs Fiscal Year 2001

    Energy Technology Data Exchange (ETDEWEB)

    None

    2004-02-04

    This document provides information on energy consumption in Federal buildings, operations, and vehicles and equipment, and documents activities conducted by Federal agencies to meet the statutory requirements.

  14. Wind power today: 1999 Wind Energy program highlights

    Energy Technology Data Exchange (ETDEWEB)

    Weis-Taylor, Pat

    2000-04-06

    Wind Power Today is an annual publication that provides an overview for the Department of Energy's Wind Energy Program. The purpose of Wind Power Today is to show how DOE's Wind Energy Program supports wind turbine research and deployment in hopes of furthering the advancement of wind technologies that produce clean, low-cost, reliable energy for the 21st century. Content objectives include: Educate readers about the advantages and potential for widespread deployment of wind energy; explain DOE wind energy program objectives and goals; describe program accomplishments in research and application; examine the barriers to widespread deployment; describe benefits of continued research and development; facilitate technology transfer; attract cooperative wind energy projects with industry.

  15. Modeling and prioritizing demand response programs in power markets

    International Nuclear Information System (INIS)

    Aalami, H.A.; Moghaddam, M. Parsa; Yousefi, G.R.

    2010-01-01

    One of the responsibilities of power market regulator is setting rules for selecting and prioritizing demand response (DR) programs. There are many different alternatives of DR programs for improving load profile characteristics and achieving customers' satisfaction. Regulator should find the optimal solution which reflects the perspectives of each DR stakeholder. Multi Attribute Decision Making (MADM) is a proper method for handling such optimization problems. In this paper, an extended responsive load economic model is developed. The model is based on price elasticity and customer benefit function. Prioritizing of DR programs can be realized by means of Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) method. Considerations of ISO/utility/customer regarding the weighting of attributes are encountered by entropy method. An Analytical Hierarchy Process (AHP) is used for selecting the most effective DR program. Numerical studies are conducted on the load curve of the Iranian power grid in 2007. (author)

  16. Coal Power Systems strategic multi-year program plans; TOPICAL

    International Nuclear Information System (INIS)

    None

    2001-01-01

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL)

  17. Wind Power Today: 2000 Wind Energy Program Highlights

    Energy Technology Data Exchange (ETDEWEB)

    Weis-Taylor, W.

    2001-05-08

    Wind Power Today is an annual publication that provides an overview of the U.S. Department of Energy's Wind Energy Program. The purpose of Wind Power Today is to show how DOE's Wind Energy Program supports wind turbine research and deployment in hopes of furthering the advancement of wind technologies that produce clean, low-cost, reliable energy. Content objectives include: educate readers about the advantages and potential for widespread deployment of wind energy; explain the program's objectives and goals; describe the program's accomplishments in research and application; examine the barriers to widespread deployment; describe the benefits of continued research and development; facilitate technology transfer; and attract cooperative wind energy projects with industry.

  18. Bonneville Power Administration Wildlife Mitigation Program : Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1996-08-01

    Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the development of the Federal Columbia River Power System. BPA accomplishes this mitigation by funding projects consistent with those recommended by the Northwest Power Planning Council (Council). The projects are submitted to the Council from Indian Tribes, state agencies, property owners, private conservation groups, and other Federal agencies. Future wildlife mitigation actions with potential environmental impacts are expected to include land acquisition and management, water rights acquisition and management, habitat restoration and enhancement, installation of watering devices, riparian fencing, and similar wildlife conservation actions. BPA needs to ensure that individual wildlife mitigation projects are planned and managed with appropriate consistency across projects, jurisdictions, and ecosystems, as well as across time. BPA proposes to standardize the planning and implementation of individual wildlife mitigation projects funded by BPA. Alternative 1 is the No Action alternative. Five standardizing alternatives are identified to represent the range of possible strategies, goals, and procedural requirements reasonably applicable to BPA-funded projects under a standardized approach to project planning and implementation. All action alternatives are based on a single project planning process designed to resolve site-specific issues in an ecosystem context and to adapt to changing conditions and information.

  19. Obrigheim nuclear power plant. Federal Administrative Court, judgement of June 7, 1991. BVerWG 7 C 43.90

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    With its judgement the Federal Administrative Court has reversed the decision of the Administrative Court of Justice (VGH) Baden-Wuerttemberg from May 1990. Legally incorrect the VGH has assumed that the nuclear power station Obrigheim was in operation without necessary license as the second operating license was limited to a test run and the time past was to long for a test run. In the opinion of the Federal Administrative Court by giving a license for the test run without determinating a limit in time permanent operation is not definitively permitted, but it is permitted until the office takes a decision about the end of the test run. (orig.) [de

  20. Inpo programs for improvement of nuclear power plant operations

    International Nuclear Information System (INIS)

    Edward Moore, C.

    1989-01-01

    The talk shows how key INPO programs help foster improved nuclear power operations. The talk focuses on the results being seen from six key efforts: evaluations, training and accreditation, assistance, events analysis and information exchange, human performance and maintenance. The talk stresses that all INPO programs are geared toward enhanced performance and that progress in key performance areas since 1980 shows that INPO and U.S. industry efforts are achieving desired results

  1. Planning and development of nuclear power programmes in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Haunschild, H.H.

    1983-01-01

    The development of the peaceful utilization of nuclear science and technology in the Federal Republic of Germany started in 1955. It concentrated on the development of nuclear energy with its important potential for energy supply, in order to cover the growing energy demand of the recovering economy, and on the application of nuclear radiation and radioactive isotopes in various areas of science and technology such as biology, medicine, chemistry, physics, materials research and development. From the beginning, the nuclear energy programme was a joint undertaking of government, industry and science. To achieve the necessary impetus and to supplement the activities of industry and universities, several nuclear research centres, in particular at Juelich and Karlsruhe, were founded. This comprehensive approach was the basis for the following rapid development of nuclear technology, as well as for its competitive structure and its safety record. With regard to nuclear energy utilization for electricity generation, heat supply, and ship propulsion a broad range of reactor concepts such as light- and heavy-water reactors, high-temperature reactors, and fast-breeder reactors was examined. Today, nuclear energy meets about 17% of the country's electricity demand. Fifteen nuclear power plants with a capacity of about 10,000 MW(e) are in operation; 11 plants with a total capacity of about 12,000 MW(e) are under construction, and the construction of another 10 plants is definitely planned. Activities in uranium enrichment, fuel element fabrication, and reprocessing have reached the industrial stage. The paper indicates possible future trends of the nuclear programme. The successful development of a national nuclear energy programme goes in parallel with broad international co-operation. Therefore the efforts to re-establish a stable system for co-operation in nuclear commerce and technology, based on international safeguards, should be strengthened

  2. Intergovernmental Immunities in Litigation, Taxation, and Regulation: Separation of Powers Issues in Controversies About Federalism

    Science.gov (United States)

    Tribe, Laurence H.

    1976-01-01

    The author argues that attention to the question of who should decide an intergovernmental immunity issue--the states, the federal courts, the federal executive, or Congress--illuminates the law of eleventh amendment immunities and intergovernmental tax and regulatory immunities and supports all but a handful of the results courts have reached.…

  3. Modeling on a PWR power conversion system with system program

    International Nuclear Information System (INIS)

    Gao Rui; Yang Yanhua; Lin Meng

    2007-01-01

    Based on the power conversion system of nuclear and conventional islands of Daya Bay Power Station, this paper models the thermal-hydraulic systems of primary and secondary loops for PWR by using the PWR best-estimate program-RELAP5. To simulate the full-scope power conversion system, not only the traditional basic system models of nuclear island, but also the major system models of conventional island are all considered and modeled. A comparison between the calculated results and the actual data of reactor demonstrates a fine match for Daya Bay Nuclear Power Station, and manifests the feasibility in simulating full-scope power conversion system of PWR by RELAP5 at the same time. (authors)

  4. Evaluation of Electric Power Procurement Strategies by Stochastic Dynamic Programming

    Science.gov (United States)

    Saisho, Yuichi; Hayashi, Taketo; Fujii, Yasumasa; Yamaji, Kenji

    In deregulated electricity markets, the role of a distribution company is to purchase electricity from the wholesale electricity market at randomly fluctuating prices and to provide it to its customers at a given fixed price. Therefore the company has to take risk stemming from the uncertainties of electricity prices and/or demand fluctuation instead of the customers. The way to avoid the risk is to make a bilateral contact with generating companies or install its own power generation facility. This entails the necessity to develop a certain method to make an optimal strategy for electric power procurement. In such a circumstance, this research has the purpose for proposing a mathematical method based on stochastic dynamic programming and additionally considering the characteristics of the start-up cost of electric power generation facility to evaluate strategies of combination of the bilateral contract and power auto-generation with its own facility for procuring electric power in deregulated electricity market. In the beginning we proposed two approaches to solve the stochastic dynamic programming, and they are a Monte Carlo simulation method and a finite difference method to derive the solution of a partial differential equation of the total procurement cost of electric power. Finally we discussed the influences of the price uncertainty on optimal strategies of power procurement.

  5. Status of nuclear power programs in South America

    International Nuclear Information System (INIS)

    Spitalnik, J.

    2010-10-01

    Analysis of nuclear power plants construction in four South American countries - Argentina, Brazil, Chile and Uruguay - is made based on programs set up by government specialized agencies. In Argentina, in a time-span up to 2023, the nuclear power program considers a five-fold increase of the current installed capacity reaching some 5,000 M We. The Brazilian reference scenario will install additional 4,000 M We, up to 2030, to reach a total installed capacity of about 6,000 M We. Other scenarios could bring this total to some 8,000 - 10,000 M We. Chile and Uruguay have started strategic studies to place the nuclear power option in the future energy matrix of the country. The government of Chile set up, in 2007, a Task Group to determine whether nuclear power could be considered a viable option. This Group concluded that nuclear power is a mature, safe competitive, and low carbon emitter technology that could be considered a viable option. A Nuclear Advisory Group was created who made studies to install a nuclear power plant in the 2016-2021 time-span. In December 2008, the Uruguayan Government created a high level Working Group to establish the feasibility conditions for Nuclear Power Generation in the country. (Author)

  6. Key Aspects of the Federal Direct Loan Program's Cost Estimates: Department of Education. Report to Congressional Requesters.

    Science.gov (United States)

    Calbom, Linda M.; Ashby, Cornelia M.

    Because of concerns about the Department of Education's reliance on estimates to project costs of the William D. Ford Federal Direct Loan Program (FDLP) and a lack of historical information on which to base those estimates, Congress asked the General Accounting Office (GAO) to review how the department develops its cost estimates for the program,…

  7. 45 CFR 2521.45 - What are the limitations on the Federal government's share of program costs?

    Science.gov (United States)

    2010-10-01

    ...) Your share of member support costs must be non-Federal cash. (4) The Corporation's share of health care... administration costs. (1) You may provide your share of program operating costs with cash, including other...'s share of program costs? 2521.45 Section 2521.45 Public Welfare Regulations Relating to Public...

  8. 76 FR 56982 - Announcement of Federal Underground Injection Control (UIC) Class VI Program for Carbon Dioxide (CO2

    Science.gov (United States)

    2011-09-15

    ...-9465-1] Announcement of Federal Underground Injection Control (UIC) Class VI Program for Carbon Dioxide... Injection Control (UIC) Class VI Program for Carbon Dioxide (CO 2 ) Geologic Sequestration (GS) Wells under... highlighted in the ``Report of the Interagency Task Force on Carbon Capture and Storage'' (August 2010), it is...

  9. Student Loan Programs. As Federal Costs of Loan Consolidation Rise, Other Options Should be Examined. Report to Congressional Requesters.

    Science.gov (United States)

    General Accounting Office, Washington, DC.

    In this report GAO recommends that the Secretary of Education assess the advantages of consolidation loans for borrowers and the government in light of program costs and identify options for reducing federal costs. Options could include targeting the program to borrowers at risk of default and extending existing consolidation alternatives to more…

  10. 5 CFR 831.206 - Continuation of coverage for former Federal employees of the Civilian Marksmanship Program.

    Science.gov (United States)

    2010-01-01

    ... individual's retirement records. (d) The Corporation must withhold from the pay of an individual described by paragraph (a) of this section an amount equal to the percentage withheld from the pay of a Federal employee... support the Civilian Marksmanship Program as of the day before the date of the transfer of the Program to...

  11. Federal Education Funding: Multiple Programs and Lack of Data Raise Efficiency and Effectiveness Concerns (Supplemental Information to Testimony).

    Science.gov (United States)

    General Accounting Office, Washington, DC. Health, Education, and Human Services Div.

    In 1997, United States Senator Barbara Boxer asked the General Accounting Office to address certain questions she had about education programs. The answers to her questions are provided in this report. The information centers on five areas: (1) the definitions and criteria used to identify the number of federal education programs and departments…

  12. Research, Monitoring, and Evaluation for the Federal Columbia River Estuary Program.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Diefenderfer, Heida L. (Pacific Northwest National Laboratory)

    2008-02-20

    The purpose of this document is to describe research, monitoring, and evaluation (RME) for the Federal Columbia River Estuary Program, hereafter called 'the Estuary Program'. The intent of this RME effort is to provide data and information to evaluate progress toward meeting program goals and objectives and support decision making in the Estuary Program. The goal of the Estuary Program is to understand, conserve, and restore the estuary ecosystem to improve the performance of listed salmonid populations. The Estuary Program has five general objectives, designed to fulfill the program goal, as follows: (1) Understand the primary stressors affecting ecosystem controlling factors, such as ocean conditions and invasive species. (2) Conserve and restore factors controlling ecosystem structures and processes, such as hydrodynamics and water quality. (3) Increase the quantity and quality of ecosystem structures, i.e., habitats, juvenile salmonids use during migration through the estuary. (4) Maintain the food web to benefit salmonid performance. (5) Improve salmonid performance in terms of life history diversity, foraging success, growth, and survival. The goal of estuary RME is to provide pertinent and timely research and monitoring information to planners, implementers, and managers of the Estuary Program. The goal leads to three primary management questions pertaining to the main focus of the Estuary Program: estuary habitat conservation and restoration. (1) Are the estuary habitat actions achieving the expected biological and environmental performance targets? (2) Are the offsite habitat actions in the estuary improving juvenile salmonid performance and which actions are most effective at addressing the limiting factors preventing achievement of habitat, fish, or wildlife performance objectives? (3) What are the limiting factors or threats in the estuary/ocean preventing the achievement of desired habitat or fish performance objectives? Performance measures

  13. 78 FR 25184 - Federal Housing Administration (FHA): Section 232 Healthcare Facility Insurance Program...

    Science.gov (United States)

    2013-04-30

    ..., Federalism Executive Order 13132 (entitled ``Federalism'') prohibits an agency from publishing any rule that has federalism implications if the rule either: (1) Imposes substantial direct compliance costs on... have federalism implications and does not impose substantial direct compliance costs on state and local...

  14. On Computational Power of Quantum Read-Once Branching Programs

    Directory of Open Access Journals (Sweden)

    Farid Ablayev

    2011-03-01

    Full Text Available In this paper we review our current results concerning the computational power of quantum read-once branching programs. First of all, based on the circuit presentation of quantum branching programs and our variant of quantum fingerprinting technique, we show that any Boolean function with linear polynomial presentation can be computed by a quantum read-once branching program using a relatively small (usually logarithmic in the size of input number of qubits. Then we show that the described class of Boolean functions is closed under the polynomial projections.

  15. Program of RA reactor start-up to nominal power

    International Nuclear Information System (INIS)

    1959-01-01

    The zero start-up program is followed by the program of RA reactor start-up to nominal power. This program is described in detail and includes the following measurements: radiation characteristics at the exit of the channels; gamma and fast neutron dose distribution in the reactor; influence of absorbers on the reactivity; temperature effect; absolute flux and calibration of ionization chambers; xenon effect; thermal and hydraulics; dosimetry around the reactor; neutron flux in the reactor core and in the reactor hall; heavy water level; thermal characteristics after shutdown. A list of measuring devices and instrumentation is included with the detailed action plan and list of responsible staff members

  16. Manitoba Hydro's earth power program and Manitoba market update

    International Nuclear Information System (INIS)

    Pearson, K.

    2005-01-01

    An outline of Manitoba Hydro's Earth Power program was presented. Details of the heat pump market in Manitoba were provided, including details of residential and commercial sales. Total residential heat pump sales amounted to 577 units in 2004, equivalent to over $11.2 million in sales. Commercial installations amounted to approximately $12.7 million. An outline of industry players was presented. The goals of Manitoba Hydro were outlined in relation to geothermal energy and the Power Smart program. Their objectives included increasing awareness of geothermal energy, making heat pumps more accessible, and improving industry infrastructure. Other objectives included educating the public about life-cycle cost implications, residential loans and commercial incentives. To date, the residential power loan has provided financing to over 300 Manitoba home owners for installations, with electrical savings of over 1.34 Gwh and natural gas savings of 279,425 m 3 . The program is also committed to providing assistance with feasibility studies. Provincial tax credits for the Earth Program included a 10 per cent deduction of geothermal heat pump purchases from corporation income tax. Case studies of the program were presented along with an outline of the geothermal heat pump for homes booklet. Details of the residential earth power loan were provided, including details of installation, system completion and approval processes. Awards and accolades for the program include the 2004 HRAI Education supporter award and recognition by the David Suzuki Foundation, which highlighted the program as a national leader in encouraging and facilitating the use of GeoExchange technology. tabs, figs

  17. 2 CFR 376.147 - Does an exclusion from participation in Federal health care programs under Title XI of the Social...

    Science.gov (United States)

    2010-01-01

    ... Federal health care programs under Title XI of the Social Security Act affect a person's eligibility to..., Medicaid, and other Federal health care programs under Title XI of the Social Security Act, 42 U.S.C. 1320a... Federal Agency Regulations for Grants and Agreements DEPARTMENT OF HEALTH AND HUMAN SERVICES...

  18. Profile and programming needs of federal offenders with histories of intimate partner violence.

    Science.gov (United States)

    Stewart, Lynn A; Power, Jenelle

    2014-10-01

    This study presents data on male perpetrators of domestic violence (DV) in the Correctional Service of Canada (CSC) using two samples: (a) a snapshot of all male offenders in CSC who had been assessed for DV (n = 15,166) and (b) a cumulative sample of male offenders in CSC from 2002-2010 who had been assessed as moderate or high risk for further DV (n = 4,261) DV offenders were compared to a cohort sample of non-DV offenders (n = 4,261). Analyses were disaggregated for Aboriginal and non-Aboriginal offenders. Results indicated that 40% of the federal male population had a suspected history of DV and were therefore screened in for in-depth DV risk assessment. Of these, 45% were assessed as moderate or high risk for future DV. DV offenders had higher risk and criminogenic need ratings, more learning disabilities, more mental health problems, and more extensive criminal histories than those without DV histories. Aboriginal DV offenders had high levels of alcohol dependence, suggesting a need for substance abuse treatment as part of DV programming. Most federal offenders with DV histories would be described as belonging to the Antisocial/Generalized Aggressive typology and, therefore, adhering to the Risk-Need-Responsivity principles of the effective correctional literature, cognitive-behavioral treatment that focuses on teaching skills of self-management, and changing attitudes supporting relationship violence would be recommended. © The Author(s) 2014.

  19. Reliability assurance program for operational emergency ac power system

    International Nuclear Information System (INIS)

    Heineman, J.B.; Ragland, W.A.; Mueller, C.J.

    1985-01-01

    A comprehensive review of emergency ac power systems in nuclear generating plants (the vast majority of these plants contain redundant diesel generator systems) delineates several operational areas that can be improved by instituting a reliability assurance program (RAP), which initially upgrades the diesel generator performance and provides for ongoing monitoring and maintenance based upon alert levels

  20. Knowledge Is Power Program (KIPP). What Works Clearinghouse Intervention Report

    Science.gov (United States)

    What Works Clearinghouse, 2018

    2018-01-01

    The "Knowledge Is Power Program" ("KIPP") is a nonprofit network of more than 200 public charter schools educating early childhood, elementary, middle, and high school students. The What Works Clearinghouse (WWC) identified four studies of "KIPP" that fall within the scope of the Charter Schools topic area and meet…

  1. Photovoltaic Power System and Power Distribution Demonstration for the Desert RATS Program

    Science.gov (United States)

    Colozza, Anthony; Jakupca, Ian; Mintz, Toby; Herlacher, Mike; Hussey, Sam

    2012-01-01

    A stand alone, mobile photovoltaic power system along with a cable deployment system was designed and constructed to take part in the Desert Research And Technology Studies (RATS) lunar surface human interaction evaluation program at Cinder Lake, Arizona. The power system consisted of a photovoltaic array/battery system. It is capable of providing 1 kW of electrical power. The system outputs were 48 V DC, 110 V AC, and 220 V AC. A cable reel with 200 m of power cable was used to provide power from the trailer to a remote location. The cable reel was installed on a small trailer. The reel was powered to provide low to no tension deployment of the cable. The cable was connected to the 220 V AC output of the power system trailer. The power was then converted back to 110 V AC on the cable deployment trailer for use at the remote site. The Scout lunar rover demonstration vehicle was used to tow the cable trailer and deploy the power cable. This deployment was performed under a number of operational scenarios, manned operation, remote operation and tele-robotically. Once deployed, the cable was used to provide power, from the power system trailer, to run various operational tasks at the remote location.

  2. 75 FR 36659 - Proposed Collection; Comment Request; Brain Power! The NIDA Junior Scientist Program and the...

    Science.gov (United States)

    2010-06-28

    ... of the Brain Power! Program's ability to: Increase students' knowledge about the biology of the brain... Request; Brain Power! The NIDA Junior Scientist Program and the Companion Program, Brain Power! Challenge.... Proposed Collection: Title: Brain Power! The NIDA Junior Scientist Program, for grades K-5, and the...

  3. Projected Benefits of Federal Energy Efficiency and Renewable Energy Programs: FY 2005 Budget Request

    Energy Technology Data Exchange (ETDEWEB)

    National Renewable Energy Laboratory

    2004-05-01

    The Office of Energy Efficiency and Renewable Energy (EERE) of the U.S. Department of Energy (DOE) leads the Federal Government's efforts to provide reliable, affordable, and environmentally sound energy for America, through its 11 research, development, demonstration, and deployment (RDD&D) programs. EERE invests in high-risk, high-value research and development (R&D) that, conducted in partnership with the private sector and other government agencies, accelerates the development and facilitates the deployment of advanced clean energy technologies and practices. This document summarizes the results of the benefits analysis of EERE's programs, as described in the FY 2005 Budget Request. EERE has adopted a benefits framework developed by the National Research Council (NRC) to represent the various types of benefits resulting from the energy efficiency technology improvements and renewable energy technology development prompted by EERE programs. EERE's benefits analysis focuses on three main categories of energy-linked benefits-economic, environmental, and security. These metrics are not a complete representation of the benefits or market roles of efficiency and renewable technologies, but provide an indication of the range of benefits provided. EERE has taken steps to more fully represent the NRC framework, including two key improvements to the FY 2005 analysis-adding an electricity security metric and extending the analysis through the year 2050.

  4. Projected Benefits of Federal Energy Efficiency and Renewable Energy Programs: FY 2006 Budget Request

    Energy Technology Data Exchange (ETDEWEB)

    Norland, D.; Jenkin, T.

    2005-05-01

    The Office of Energy Efficiency and Renewable Energy (EERE) of the U.S. Department of Energy (DOE) leads the Federal Government's efforts to provide reliable, affordable, and environmentally sound energy for America, through its 11 research, development, demonstration, and deployment (RDD&D) programs. EERE invests in high-risk, high-value research and development (R&D) that, conducted in partnership with the private sector and other government agencies, accelerates the development and facilitates the deployment of advanced clean energy technologies and practices. EERE designs its RDD&D activities to improve the Nation's readiness for addressing current and future energy needs. This document summarizes the results of the benefits analysis of EERE's programs, as described in the FY 2006 Budget Request. EERE has adopted a benefits framework developed by the National Research Council (NRC) to represent the various types of benefits resulting from the energy efficiency technology improvements and renewable energy technology development supported by EERE programs. Specifically, EERE's benefits analysis focuses on three main categories of energy-linked benefits--economic, environmental, and security.

  5. DOE-HUD Initiative on Energy Efficiency in Housing: A federal partnership. Program summary report

    Energy Technology Data Exchange (ETDEWEB)

    Brinch, J. [Energetics, Inc., Columbia, MD (United States)

    1996-06-01

    One of the primary goals of the US Department of Housing and urban Development (HUD) is the expansion of home ownership and affordable housing opportunities. Recognizing that energy efficiency is a key component in an affordable housing strategy, HUD and the US Department of Energy (DOE) created the DOE-HUD Initiative on Energy Efficiency in Housing. The DOE-HUD Initiative was designed to share the results of DOE research with housing providers throughout the nation, to reduce energy costs in federally-subsidized dwelling units and improve their affordability and comfort. This Program Summary Report provides an overview of the DOE-HUD Initiative and detailed project descriptions of the twenty-seven projects carried out with Initiative funding.

  6. Global warming mitigation strategies and programs for power plant developers

    International Nuclear Information System (INIS)

    Holmes, N.R.

    1992-01-01

    Power plant developers are increasingly being surprised by regulatory agencies requiring them to mitigate the carbon dioxide(CO 2 ) emissions from their proposed power plants, as part of the plant's operating permit conditions. Since carbon dioxide is not a criteria pollutant with a National Ambient Air Quality Standard, power plant developers are often troubled by this additional regulatory requirement. This presentation will describe the contribution that CO 2 makes to global warming, the role of trees and forests as carbon sequesters or sinks, some non-forestry related and forestry related mitigation programs, including the advantages, disadvantages, and some cost estimates for the forestry related CO 2 mitigation programs. As public concern about global warming continues to escalate, it is almost certain that regulatory agencies will increase their focus on CO 2 mitigation

  7. HEDPIN: a computer program to estimate pinwise power density

    International Nuclear Information System (INIS)

    Cappiello, M.W.

    1976-05-01

    A description is given of the digital computer program, HEDPIN. This program, modeled after a previously developed program, POWPIN, provides a means of estimating the pinwise power density distribution in fast reactor triangular pitched pin bundles. The capability also exists for computing any reaction rate of interest at the respective pin positions within an assembly. HEDPIN was developed in support of FTR fuel and test management as well as fast reactor core design and core characterization planning and analysis. The results of a test devised to check out HEDPIN's computational method are given, and the realm of application is discussed. Nearly all programming is in FORTRAN IV. Variable dimensioning is employed to make efficient use of core memory and maintain short running time for small problems. Input instructions, sample problem, and a program listing are also given

  8. 18 CFR 382.201 - Annual charges under Parts II and III of the Federal Power Act and related statutes.

    Science.gov (United States)

    2010-04-01

    ... annual charges to be assessed to power marketing agencies. The adjusted costs of administration of the... Act and related statutes. (a) Determination of costs to be assessed to public utilities. The adjusted costs of administration of the electric regulatory program, excluding the costs of regulating the Power...

  9. Reduction of regional disparities in electric power prices by spatially effective measures and planning in the Federal Republic of Germany

    Energy Technology Data Exchange (ETDEWEB)

    Wagner, G

    1984-01-01

    For a long time energy policy has been trying to reduce disparities in electric power prices by administrative and financial measures alone. Governmental planning was opening up new prospects when long-range fuel transport - and in particular the transport of hard coal by ship or by rail - was seeing a drop in prices in the mid seventies. Since fuel transport has been lower-priced than the transport of equivalent quantities of electric power, regional disparities in electric power prices which are due to the respective supply structures may be levelled by way of power plant site selection and power plant installation according to the specific regional loads. A decentralized expansion of power generation within reach of the consumer requires but a minimum of wiring. Structural price disparities are reduced in particular in regions importing electric power at excessive prices. In addition, costs may be saved by rational energy utilization consisting above all in the application of dual-purpose power plants and by the rationalization of network infrastuctures. The study abstracted is part of a research project of the Federal Research Institute for Land Studies and Planning. The project is dealing with concepts of decentralized electric power supply and space heating. It adds to already existing related studies which deal above all with the basic problems of scheduling and planning the contents and inner structure of decentralized energy concepts.

  10. Case study on the US superconducting power transmission program

    Energy Technology Data Exchange (ETDEWEB)

    Hammel, E.F.

    1996-02-01

    After the 1911 discovery of superconductivity (the abrupt loss of electrical resistance in certain materials at very low temperatures), attempts were made to make practical use of this phenomenon. Initially these attempts failed, but in the early 1960s (after 50 years of research) they succeeded. By then, the projected growth in the production and consumption of electrical energy required much higher capacity power transmission capabilities than were available or likely to become available from incremental improvements in existing transmission technology. Since superconductors were capable in principle of transmitting huge amounts of power, research programs to develop and demonstrate superconducting transmission lines were initiated in the US and abroad. The history of the US program, including the participants, their objectives, funding and progress made, is outlined. Since the R&D program was terminated before the technology was completely demonstrated, the reasons for and consequences of this action are discussed in a final section.

  11. The National Shipbuilding Research Program. Following Development of the Federal Effluent Guidelines for Metal Products and Machinery Facilities

    Science.gov (United States)

    1999-02-01

    Cleaning Rules to Shipyards SDO\\SECT1 1-1 1. Introduction Background The Federal Clean Water Act (CWA) established a program to restore and maintain the...2-1 2. MP&M Rulemaking Process EPA Categorical Discharge Standards Program The Clean Water Act established a program to restore and... microfiltration and reverse osmosis. • Oil and grease content is used as a surrogate for monitoring toxic organics. • The technical and financial

  12. Improving regulatory effectiveness in federal/state siting actions: state regulatory activity involved in need for power

    International Nuclear Information System (INIS)

    Nassikas, J.

    1977-04-01

    The individual views are presented of the panel members relating to the basic issues and framework for improvements of the Federal/state process for licensing of nuclear power plants, associated facilities, transmission lines, reprocessing of fuel and uranium enrichment. The synopsis supplements the initial synopsis of the views presented to the National Governors Conference Workshop ''State Perspectives on Energy Facility Siting'' in Atlanta, Georgia on December 15--16, 1976. Both synopses constitute the report of this panel

  13. Man as a protective barrier in nuclear power technology: the requirements, viewed by the Federal Minister for Home Affairs

    International Nuclear Information System (INIS)

    Fechner, J.B.

    1981-06-01

    Evaluation of nuclear power plant incidents frequently reveals man as a major element of risk. Yet, in a nuclear power plant man has the function of an important protective barrier, either by maintaining the plant, by detecting and limiting faults or incidents, or by taking proper measures in accidents. This is true despite, or perhaps because of, the high degree of plant automation. For this reason, it is indispensable that a high level of engineered plant safeguards be accompanied by a minimum of faults contributed by human action. This implies that the staff and their working conditions must meet the same stringent safety requirements as the nuclear power plant proper. Reactor manufacturers, nuclear power plant operators and the responsible authorities try to optimize this human contribution. The Federal Ministry of the Interior, through its Special Technical Guidelines and its continuation training measures, occupies an important position in this respect. Further measures and ordinances are being prepared by that Ministry

  14. Wind Power Today: Wind Energy Program Highlights 2001

    Energy Technology Data Exchange (ETDEWEB)

    2002-05-01

    Wind Power Today is an annual publication that provides an overview of the U.S. Department of Energy's Wind Energy Program accomplishments for the previous year. The purpose of Wind Power Today is to show how DOE's Wind Energy Program supports wind turbine research and deployment in hopes of furthering the advancement of wind technologies that produce clean, low-cost, reliable energy. Content objectives include: educate readers about the advantages and potential for widespread deployment of wind energy; explain the program's objectives and goals; describe the program's accomplishments in research and application; examine the barriers to widespread deployment; describe the benefits of continued research and development; facilitate technology transfer; and attract cooperative wind energy projects with industry. This 2001 edition of Wind Power Today also includes discussions about wind industry growth in 2001, how DOE is taking advantage of low wind speed regions through advancing technology, and distributed applications for small wind turbines.

  15. Department of Defense high power laser program guidance

    Science.gov (United States)

    Muller, Clifford H.

    1994-06-01

    The DoD investment of nominally $200 million per year is focused on four high power laser (HPL) concepts: Space-Based Laser (SBL), a Ballistic Missile Defense Organization effort that addresses boost-phase intercept for Theater Missile Defense and National Missile Defense; Airborne Laser (ABL), an Air Force effort that addresses boost-phase intercept for Theater Missile Defense; Ground-Based Laser (GBL), an Air Force effort addressing space control; and Anti-Ship Missile Defense (ASMD), a Navy effort addressing ship-based defense. Each organization is also supporting technology development with the goal of achieving less expensive, brighter, and lighter high power laser systems. These activities represent the building blocks of the DoD program to exploit the compelling characteristics of the high power laser. Even though DoD's HPL program are focused and moderately strong, additional emphasis in a few technical areas could help reduce risk in these programs. In addition, a number of options are available for continuing to use the High-Energy Laser System Test Facility (HELSTF) at White Sands Missile Range. This report provides a brief overview and guidance for the five efforts which comprise the DoD HPL program (SBL, ABL, GBL, ASMD, HELSTF).

  16. Federal programs for the Elementary School and the materialization of everybody’s right to an education of quality

    Directory of Open Access Journals (Sweden)

    Elton Luiz Nardi

    2017-01-01

    Full Text Available This paper aims at analyzing the congruence between federal programs towards the regular elementary school and the reinforcement of conditions that imply the materialization of everybody‟s right to an education of quality. The paper considers data from 2007, 2009, 2011 and 2013 about access and permanence in school, quality of elementary school officially checked and programs created by the federal government when exercising its supplementary redistributive action. Even though the results suggest an adequacy of the set of programs according to variables that inform the educational and social difference in the country, they raise some questions regarding the potential to face more specific challenges of each stage of basic education. The conclusion highlights that a greater alignment between the programs and demands, in terms of guaranteeing access and permanence in school, constitutes a fundamental action to reinforce the congruence between elected programs and the materialization of the right to an education of quality.

  17. Evaluation of the Immunization Program in the Federation of Bosnia and Herzegovina - Possible Modalities for Improvement.

    Science.gov (United States)

    Husic, Fuad; Jatic, Zaim; Joguncic, Anes; Sporisevic, Lutvo

    2018-03-01

    Immunization is a lifelong preventive activity that helps prevent/reduce disease, prevent/ reduce mortality and prevent disability from specific infectious diseases. Authors of this paper researched the WHO extended program of mandatory immunization of children from birth to the age of 18 years and analyzed how it has been implemented in the Federation of Bosnia and Herzegovina (FB&H), because the guidelines of the specialist physician societies on immunization of adults, elderly people and risk groups of the population are missing. The paper presents the basic characteristics of the immunization program in the FB&H and the world, points to the most frequent problems that the doctor practitioner has in carrying out immunization, and also presents possible modalities of improving immunization. It is pointed out the need to develop the national guidelines and individual immunization booklets, introduction of electronic registration of immunization, and continuous education of health professionals of all profiles, population, educators, teachers and harmonious partnership relations of health workers, population, social entities and the media with the aim of achieving an appropriate lifelong vaccination.

  18. The Russian Federation's Ministry of Atomic Energy: Programs and Developments

    Energy Technology Data Exchange (ETDEWEB)

    CM Johnson

    2000-07-24

    This paper reviews select programs driving the Ministry of Atomic Energy of the Russian Federation's (Minatom) efforts to raise funds, comments on their potential viability, and highlights areas likely to be of particular concern for the US over the next three to five years. The paper's findings are: (1) Despite numerous cabinet displacements throughout the Yeltsin administration, Yevgeny Adamov was reappointed Minister on four occasions. With Boris Yeltsin's January 1, 2000 resignation, Adamov's long-term position as the head of the Ministry is more tenuous, but he will likely retain his position until at least the March 2000 elections. Acting President Vladimir Putin is unlikely to reorganize his cabinet prior to that date and there are no signs that Putin is dissatisfied with Adamov's leadership of Minatom. (2) Adamov's chief priorities are downsizing Minatom's defense sector, increasing the oversight of subsidiary bodies by the central bureaucracy and consolidating commercial elements of the Ministry within an umbrella organization called Atomprom. (3) Viktor Mikhaylov, Adamov's predecessor and critic of his reform efforts, has been relieved of his duties as First Deputy Minister. While he retains his positions as Chief of the Science Councils and Chief Scientist at Arzamas-16, his influence on Minatom's direction is greatly diminished. Adamov will likely continue his efforts to further marginalize Mikhaylov in the coming year. (4) Securing extra-budgetary sources of income continues to be the major factor guiding Minatom's international business dealings. The Ministry will continue to aggressively promote the sale of nuclear technology abroad, often to countries with questionable nonproliferation commitments. (5) Given the financial difficulties in Russia and Minatom's client states, however, few nuclear development programs will come to fruition for a number of years, if ever. Nevertheless, certain

  19. Annual report to Congress on Federal Government Energy Management and Conservation Programs, Fiscal Year 1998

    Energy Technology Data Exchange (ETDEWEB)

    None

    2000-03-20

    In fulfillment of statutory requirements, this report provides information on energy consumption in Federal buildings and operations and also documents activities conducted by Federal agencies in fulfilling those requirements during Fiscal Year 1998.

  20. Annual report to Congress on Federal Government Energy Management and Conservation Programs, Fiscal Year 1997

    Energy Technology Data Exchange (ETDEWEB)

    None

    1999-08-13

    In fulfillment of statutory requirements, this report provides information on energy consumption in Federal buildings and operations and also documents activities conducted by Federal agencies in fulfilling those requirements during Fiscal Year 1997.

  1. Virtual classes: a powerful mechanism in object-oriented programming

    DEFF Research Database (Denmark)

    Madsen, Ole Lehrmann; Møller-Pedersen, Birger

    1989-01-01

    The notions of class, subclass and virtual procedure are fairly well understood and recognized as some of the key concepts in object-oriented programming. The possibility of modifying a virtual procedure in a subclass is a powerful technique for specializing the general properties of the superclass....... In most object-oriented languages, the attributes of an object may be references to objects and (virtual) procedures. In Simula and BETA it is also possible to have class attributes. The power of class attributes has not yet been widely recognized. In BETA a class may also have virtual class attributes...

  2. Wind Powering America Anemometer Loan Program: A Retrospective

    Energy Technology Data Exchange (ETDEWEB)

    Jimenez, T.

    2013-05-01

    This white paper details the history, mechanics, status, and impact of the Native American Anemometer Loan Program (ALP) conducted by the U.S. Department of Energy's Wind Powering America (WPA) initiative. Originally conceived in 2000 and terminated (as a WPA activity) at the end of FY 2011, the ALP has resulted in the installation of anemometers at 90 locations. In addition, the ALP provided support for the installation of anemometers at 38 additional locations under a related ALP administered by the Western Area Power Administration.

  3. Technical Proposal Salton Sea Geothermal Power Pilot Plant Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1975-03-28

    The proposed Salton Sea Geothermal Power Pilot Plant Program comprises two phases. The objective of Phase 1 is to develop the technology for power generation from high-temperature, high-salinity geothermal brines existing in the Salton Sea known geothermal resources area. Phase 1 work will result in the following: (a) Completion of a preliminary design and cost estimate for a pilot geothermal brine utilization facility. (b) Design and construction of an Area Resource Test Facility (ARTF) in which developmental geothermal utilization concepts can be tested and evaluated. Program efforts will be divided into four sub-programs; Power Generation, Mineral Extraction, Reservoir Production, and the Area Resources Test Facility. The Power Generation Subprogram will include testing of scale and corrosion control methods, and critical power cycle components; power cycle selection based on an optimization of technical, environmental and economic analyses of candidate cycles; preliminary design of a pilot geothermal-electric generating station to be constructed in Phase 2 of this program. The Mineral Extraction Subprogram will involve the following: selection of an optimum mineral recovery process; recommendation of a brine clean-up process for well injection enhancement; engineering, construction and operation of mineral recovery and brine clean-up facilities; analysis of facility operating results from environmental, economical and technical point-of-view; preliminary design of mineral recovery and brine clean-up facilities of sufficient size to match the planned pilot power plant. The Reservoir Production Subprogram will include monitoring the operation and maintenance of brine production, handling and injection systems which were built with private funding in phase 0, and monitoring of the brine characteristics and potential subsidence effects during well production and injection. Based on the above, recommendations and specifications will be prepared for production and

  4. Syrinx - a research program for the pulsed power radiation facility

    International Nuclear Information System (INIS)

    Etlicher, B.; Chuvatin, A.S.; Choi, P.

    1996-01-01

    Syrinx is a targeted research program with the objective to study, through practical examples, the fundamentals necessary to define the details of all parts which will be required for a new powerful plasma radiation source. The current level of activities of Syrinx is in the design and construction of a multi-megajoule class IES based pulsed power driver which will use long conduction Plasma Opening Switch technology. The present paper reviews mainly the basic experimental research of the POS a nd Z-pinch accomplished in the framework of Syrinx project. This work has a unique international level of participation, from conceptual designs to particular investigations. (author). 9 figs., 17 refs

  5. Lessons learned from the NREL village power program

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, R.W. [National Renewable Energy Lab., Golden, CO (United States)

    1998-09-01

    Renewable energy solutions for village power applications can be economical, functional, and sustainable. Pilot projects are an appropriate step in the development of a commercially viable market for rural renewable energy solutions. Moreover, there are a significant number of rural electrification projects under way that employ various technologies, delivery mechanisms, and financing arrangements. These projects, if properly evaluated, communicated, and their lessons incorporated in future projects and programs, can lead the way to a future that includes a robust opportunity for cost-effective, renewable-based village power systems. This paper summarizes some of NREL`s recent experiences and lessons learned.

  6. Lessons Learned from the NREL Village Power Program

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, R.

    1998-07-01

    Renewable energy solutions for village power applications can be economical, functional, and sustainable. Pilot projects are an appropriate step in the development of a commercially viable market for rural renewable energy solutions. Moreover, there are a significant number of rural electrification projects under way that employ various technologies, delivery mechanisms, and financing arrangements. These projects, if properly evaluated, communicated, and their lessons incorporated in future projects and programs, can lead the way to a future that includes a robust opportunity for cost-effective, renewable-based village power systems. This paper summarizes some of NRELs recent experiences and lessons learned.

  7. Southwestern Federal Power System 1995 Financial Statement audit under the Chief Financial Officers Act (WR-FC-96-02)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-22

    The Southwestern Federal Power System encompasses the operation of 24 hydroelectric power plants by the U.S. Army Corps of Engineers and the marketing of power and energy from those plants by the Southwestern Power Administration of the U.S. Department of Energy. To integrate the operation of these hydroelectric generating plants and to transmit power from the dams to its customers, Southwestern Power Administration (Southwestern) maintains 2,220 kilometers (1,380 miles) of high-voltage transmission lines, 24 substations, and 46 microwave and VHF radio sites. Southwestern`s headquarters are in Tulsa, Oklahoma; its dispatch center is in Springfield, Missouri; and its maintenance crews are based in Jonesboro, Arkansas, in Gore and Tupelo, Oklahoma, and in Springfield, Missouri. Three offices - Power Marketing and Delivery, Maintenance, and Administration and Rates - are responsible for meeting Southwestern`s mission. Twelve of the 24 generating plants are scheduled directly by Southwestern, and a total of 19 contribute to the interconnected system operations. Generation at the five remaining projects (Denison, Narrows, Sam Rayburn, Whitney, and Willis) is used to serve specific customer loads. At the end of fiscal year 1995, Southwestern marketed power and energy to 10 generation and transmission cooperatives, one distribution cooperative, three military installations, 44 municipal utilities, and three municipal utility joint-action agencies. One of the joint-action agencies has its own allocation of power from Southwestern; the other two serve 33 municipal utilities to whom Southwestern has allocated power. The total number of power allocation customers is 92. Additionally, excess energy is occasionally sold to non-allocation utilities.

  8. Enhancing materials management programs in nuclear power plants

    International Nuclear Information System (INIS)

    Hassaballa, M.M.; Malak, S.M.

    1992-01-01

    Materials management programs for the nuclear utilities in the United States are continually being affected, concurrent with the gradual disappearance of qualified component and replacement parts vendors by regulatory concerns about procurement and materials management. In addition, current economic and competitive pressures are forcing utilities to seek avenues for reducing procurement costs for safety-related items. In response to these concerns, initiatives have been undertaken and engineering guidelines have been developed by the nuclear power industry-sponsored organizations, such as the Electric Power Research Institute and the Nuclear Management Resources Council. It is our experience that successful materials management programs require a multitude of engineering disciplines and experience and are composed of three major elements: strategic procurement plan, parts classification and procurement data base, and enhancement tools. This paper provides a brief description of each of the three elements

  9. Status of NASA's Stirling Space Power Converter Program

    International Nuclear Information System (INIS)

    Dudenhoefer, J.E.; Winter, J.M.

    1994-01-01

    An overview is presented of the NASA Lewis Research Center Free-Piston Stirling Space Power Converter Technology Program. This work is being conducted under NASA's Civil Space Technology Initiative. The goal of the CSTI High Capacity Power Element is to develop the technology base needed to meet the long duration, high capacity power requirements for future NASA space initiatives. Efforts are focused upon increasing system power output and system thermal and electric energy conversion efficiency at least fivefold over current SP-100 technology, and on achieving systems that are compatible with space nuclear reactors. This paper will discuss Stirling experience in Space Power Converters. Fabrication is nearly completed for the 1050 K Component Test Power Converter (CTPC); results of motoring tests of the cold end (525 K), are presented. The success of these and future designs is dependent upon supporting research and technology efforts including heat pipes, bearings, superalloy joining technologies, high efficiency alternators, life and reliability testing and predictive methodologies. This paper provides an update of progress in some of these technologies leading off with a discussion of free-piston Stirling experience in space

  10. The Federal Administrative Court confirms unlawfulness of nuclear power moratorium. Political primacy is only valid in the bounds of justice

    International Nuclear Information System (INIS)

    Leidinger, Tobias

    2014-01-01

    With its decision on December 20 th , the Federal Administrative Court (BVwerfG) came to the legally valid conclusion that after the Fukushima nuclear power plant accident, the supervision court order related to the law on nuclear installation by the Hessian Ministry for the Environment, in order to stop operating nuclear power plants Biblis A and B for 3 months or rather not to put in operation again, was unlawful (BVwerfG 7 B 18.13 und 7 B 19.13). Beforehand, the Hessian Administrative Court (Hess. VGH) had already pronounced its judgement on February 27 th 2013. The supervising orders were part of the so-called nuclear power moratorium. They were issued after the resolution of the federal government, at demand of the Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU) towards their nearby countries, and were identically executed by the supervisory authority of the other site-countries. Besides Biblis in Hesse, nuclear power plants in Neckarwestheim I and Philippsburg 1, Baden-Wurttemberg, Isar 1 in Bavaria, Unterweser in Lower Saxony, as well as Brunsbuettel in Schleswig-Holstein, were affected. However only RWE took legal action and was now affirmed - after the Hessian VGH verdict- by the highest German administrative court: The nuclear power moratorium - the first step to withdrawal of nuclear power in Germany - was unlawful. The decision taken by the BVerwG - as well as the one by the Hessian VGH - indicates a juridical clear and precise argumentation. The partially polemic and unobjective critic, which the VHG-verdict experienced, did not disguise, just as little as the political conflict concerning the withdrawal from nuclear energy, the view of federal judges, regarding the decision-relevant questions nor did they influence their reply. The political primacy finds its limits in the bounds of justice. Existing rights do not become thus a paper waste because there is a fundamental decision. This takes effectiveness for

  11. High-Power Microwave Transmission and Mode Conversion Program

    Energy Technology Data Exchange (ETDEWEB)

    Vernon, Ronald J. [Univ. of Wisconsin, Madison, WI (United States)

    2015-08-14

    This is a final technical report for a long term project to develop improved designs and design tools for the microwave hardware and components associated with the DOE Plasma Fusion Program. We have developed basic theory, software, fabrication techniques, and low-power measurement techniques for the design of microwave hardware associated gyrotrons, microwave mode converters and high-power microwave transmission lines. Specifically, in this report we discuss our work on designing quasi-optical mode converters for single and multiple frequencies, a new method for the analysis of perturbed-wall waveguide mode converters, perturbed-wall launcher design for TE0n mode gyrotrons, quasi-optical traveling-wave resonator design for high-power testing of microwave components, and possible improvements to the HSX microwave transmission line.

  12. Audit program for physical security systems at nuclear power plants

    International Nuclear Information System (INIS)

    Minichino, C.

    1982-01-01

    Licensees of nuclear power plants conduct audits of their physical security systems to meet the requirements of 10 CFR 73, Physical Protection of Plants and Materials. Section 73.55, Requirements for physical Protection of Licensed Activities in Nuclear Power Reactors Against Radiological Sabotage, requires that the security programs be reviewed at least every 12 months, that the audit be conducted by individuals independent of both security management and security supervision, and that the audit program review all aspects of the physical security system: hardware, personnel, and operational and maintenance procedures. This report contains information for the Nuclear Regulatory Commission (NRC) and for the licensees of nuclear power reactors who carry out these comprehensive audits. Guidance on the overall management of the audit function includes organizational structure and issues concerning the auditors who perform the review: qualifications, independence, due professional care, and standards. Guidance in the audit program includes purpose and scope of the audit, planning, techniques, post-audit procedures, reporting, and follow-up

  13. Federated Search in the Wild: the combined power of over a hundred search engines

    NARCIS (Netherlands)

    Nguyen, Dong-Phuong; Demeester, Thomas; Trieschnigg, Rudolf Berend; Hiemstra, Djoerd

    2012-01-01

    Federated search has the potential of improving web search: the user becomes less dependent on a single search provider and parts of the deep web become available through a unified interface, leading to a wider variety in the retrieved search results. However, a publicly available dataset for

  14. 12 CFR 560.30 - General lending and investment powers of Federal savings associations.

    Science.gov (United States)

    2010-01-01

    .... Commercial paper and corporate debt securities 5(c)(2)(D) Up to 35% of total assets. 2,3 Community...) None. 6 Finance leasing 5(c)(1)(B), 5(c)(2)(A), 5(c)(2)(B), 5(c)(2)(D) Based on purpose and property... corporate debt securities must be aggregated with the Federal savings association's investment in consumer...

  15. The impact of the year 2000 issue on electricity grid performance and nuclear power plant operation in Bulgaria, the Russian Federation and Slovakia

    International Nuclear Information System (INIS)

    1999-07-01

    The Y2K date conversion is a potential source of problems to the operation of nuclear power plants through external events and interfaces with electrical power systems, telecommunication systems, and other supporting infrastructures, even if diagnostic and corrective actions within the plant itself, both planned or implemented, are successful. At the end of 1998 there were 425 nuclear power plants in operation in 31 Member States. Most countries and regions are conducting intensive diagnostic and corrective activities to 'find and fix' Y2K software (including embedded software) and equipment problems in their nuclear power plants. These efforts are supplemented by contingency plans. Other countries and regions have not been making comparable efforts and are relying mainly on contingency planning and preparedness. Results of diagnostic and corrective activities can be of benefit to all Member States. Activities on 'find and fix' Y2K problems in electricity grid control systems and computer related technology in national and regional dispatch centers could be of considerable benefit due to the widespread use of the same components, equipment, and software. Consistent with the objectives of the International Atomic Energy Agency's Y2K program, an experts meeting was convened to collect information on Y2K activities related to grid operation in countries that operate nuclear power plants and also to identify specific actions to be taken and issues to be addressed in connection with expected grid disturbances. The countries of eastern Europe and the Russian Federation were considered to be a very important region due to delays in taking Y2K corrective actions but also due to the similarity of their electricity grid systems both in components and design but also in mode of operation. Most of these countries either operate their own nuclear power plants or are linked through their electricity grid interconnections to a neighboring country that operates nuclear power

  16. Primary care program improves reimbursement. The Federally Qualified Health Center program helps hospitals improve services to the medically indigent.

    Science.gov (United States)

    Fahey, T M; Gallitano, D G

    1993-03-01

    Under a program created by Congress in 1989, certain primary care treatment centers serving the medically and economically indigent can become Federally Qualified Health Centers (FQHCs). Recently enacted rules and regulations allow participants in the FQHC program to receive 100 percent reasonable cost reimbursement for Medicaid services and 80 percent for Medicare services. An all-inclusive annual cost report is the basis for determining reimbursement rates. The report factors in such expenses as physician and other healthcare and professional salaries and benefits, medical supplies, certain equipment depreciation, and overhead for facility and administrative costs. Both Medicaid and Medicare reimbursement is based on an encounter rate, and states employ various methodologies to determine the reimbursement level. In Illinois, for example, typical reimbursement for a qualified encounter ranges from $70 to $88. To obtain FQHC status, an organization must demonstrate community need, deliver the appropriate range of healthcare services, satisfy management and finance requirements, and function under a community-based governing board. In addition, an FQHC must provide primary healthcare by physicians and (where appropriate) midlevel practitioners; it must also offer its community diagnostic laboratory and x-ray services, preventive healthcare and dental care, case management, pharmacy services, and arrangements for emergency services. Because FQHCs must be freestanding facilities, establishing them can trigger a number of ancillary legal issues, such as those involved in forming a new corporation, complying with not-for-profit corporation regulations, applying for tax-exempt status, and applying for various property and sales tax exemptions. Hospitals that establish FQHCs must also be prepared to relinquish direct control over the delivery of primary care services.

  17. The Russian Federation State Program «Socio-Economic Development of the Far East and the Baikal Region»

    Directory of Open Access Journals (Sweden)

    Pavel Aleksandrovich Minakir

    2013-03-01

    Full Text Available The article assesses draft versions of two program documents of socio-economic development of the Far East and the Baikal Region which were prepared by the Ministry of Regional Development of the Russian Federation and the Ministry of the Russian Federation for Development of the Far East. It is shown that the above documents are not programs in the classic sense because they don’t include the centralized and precisely targeted mechanisms of project financing, aimed at maximizing systemic effects. The authors find the programs objectives fuzzy and overly broad. As a way of increasing the practical implementability of the program the study suggests simplifying the initial system, ensuring the formalizability of goals and clarifying linkages. This can be done on the basis of the principle of diversity reduction to the minimum required size

  18. Coal Power Systems strategic multi-year program plans

    Energy Technology Data Exchange (ETDEWEB)

    None

    2001-02-01

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL).

  19. Investment recovery program at Niagara Mohawk Power Corporation

    International Nuclear Information System (INIS)

    Kotcamp, R.T.

    1993-01-01

    Niagara Mohawk Power Company's pioneering investment recovery program was initiated in 1984, Its mission is to dispose of company assets classified as obsolete, scrap, surplus, or retired capital equipment that results from company operations or work projects. These assets include items such as scrap wire, pipe, line hardware, transformers, power station equipment, crates of dusty telephone modems and computer monitors, pallets of residential gas and electric meters, a box of toilet paper holders, burned-out light bulbs, chunks of electric cable, brass and copper valves, electric bills from 1952, and a dozen tattered office chairs. It was risky for Niagara Mohawk to commit money to a program that created a scrap company inside a utility and is not the core business. No one regrets the decision to create and expand investment recovery. The program has contributed more than $35,000,000 ($8,140,585 nuclear division) of cash receipts with an additional $5,000,000 of cost avoidance since its inception. The program has credited these dollars back to the operating departments, which has reduced operating costs thereby improving the open-quotes bottom line.close quotes

  20. Practical standard for nuclear power plant life management programs: 2007

    International Nuclear Information System (INIS)

    2006-03-01

    The standard specifies the method of implementing nuclear power plant life management programs. The plant life management programs evaluate the integrity of the plant structures, systems and components, assessing if appropriate measures are taken against existing aging phenomena, if there are possibilities of occurrence and development of aging phenomena and if a sufficient level of margin is maintained to assure the integrity throughout the future operating period. The programs also assess the validity of the current maintenance activities, such as trend monitoring, walkdowns, periodic tests and inspections, repair and replacement work for the purpose of preventive maintenance, and utilization of lessons learned from past trouble experience, in order to newly identify maintenance measures. The technical evaluation on aging phenomena is conducted to establish the 10 year maintenance program for nuclear power plants until the plant reaches 30 years of service. The standard was established and issued by the Atomic Energy Society of Japan (AESJ) through the discussion of experts in the associated fields. (T. Tanaka)

  1. Can we dispense with nuclear power. [Federal Republic of Germany]. Koennen wir auf Kernenergie verzichten

    Energy Technology Data Exchange (ETDEWEB)

    Frewer, H; Braun, W; Freiberger, S; Martin, J

    1986-01-01

    The aims of energy policy, which consist in safeguarding energy supply while using nuclear power as one source of energy, are discussed in an interview (H. Frewer, Managing Director of Kraftwerk Union 'KWU'). The safety of German nuclear power plants is illustratively compared with the safety of nuclear power plants in the USSR, especially the reactor at Chernobyl (Braun and Freiberger, KWU). A further contribution deals with the propagation of the radioactive plume after the accident at Chernobyl (Martin, KWU).

  2. Siting of light-water reactor power plants in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Kohler, H.A.G.

    1975-01-01

    The nuclear power plant site requirements formulated for environment protection in Germany allow nuclear power plants to be built at any site provided these requirements are duly taken into account in preparing and monitoring the site and in the design of the proposed power plant. After a brief discussion of light water reactor power plant sites, prevailing practice in site planning, site selection criteria, licensing procedure and used criteria, rules and guidelines, this paper reports on some considerations taken into account by the expert advisers and by the licensing authorities and future site planning. (orig.) [de

  3. The Blue Book. Accounting, Recordkeeping, and Reporting by Postsecondary Educational Institutions for Federally Funded Student Financial Aid Programs. [1999 Edition.

    Science.gov (United States)

    Department of Education, Washington, DC.

    This guide is intended to provide guidance to college and university business office personnel who handle recordkeeping, accounting, and other fiscal reporting functions for federal Title IV financial aid programs, as authorized by the Higher Education Act of 1965, as amended. This edition emphasizes the benefits and challenges of electronic…

  4. The Blue Book: Accounting, Recordkeeping, and Reporting by Postsecondary Educational Institutions for Federally Funded Student Financial Aid Programs.

    Science.gov (United States)

    Department of Education, Washington, DC.

    This book provides guidance to school business office personnel who handle fiscal recordkeeping, accounting, and reporting functions for federal Title IV student financial aid programs authorized by the Higher Education Act of 1965, as amended. It provides a technical resource for Title IV management responsibilities that are shared among various…

  5. 75 FR 31738 - Nondiscrimination on the Basis of Age in Programs or Activities Receiving Federal Assistance From...

    Science.gov (United States)

    2010-06-04

    ... and Advancement Act Section 12(d) of the National Technology Transfer and Advancement Act of 1995... federally funded program. II. Rulemaking History EPA first proposed regulations implementing the Age... small entities. Small entities include small businesses, small organizations, and small governmental...

  6. Do Farmers' Markets Improve Diet of Participants Using Federal Nutrition Assistance Programs? A Literature Review

    Science.gov (United States)

    Byker, Carmen J.; Misyak, Sarah; Shanks, Justin; Serrano, Elena L.

    2013-01-01

    Farmers' markets have emerged as one health strategy to improve the access and availability of fresh foods for limited-resource audiences using federal nutrition assistance programs, although their effectiveness on dietary intake is not well understood. The review reported here evaluates the strengths and weaknesses of existing research about…

  7. Finding Federal Money for Children's Services: Financing Services for Children through Title XX and Other Programs. Manual 1.

    Science.gov (United States)

    Copeland, William C.

    This is the first manual of a 4-part series on how to find, obtain, contract for and manage Federal money for children's services. The first manual concentrates on ways to locate funds for new and existing programs. Emphasis is on Title XX of the Social Security Act, but attention is given also to alternative sources where Title XX funds are not…

  8. 75 FR 31702 - Nondiscrimination on the Basis of Age in Programs or Activities Receiving Federal Assistance from...

    Science.gov (United States)

    2010-06-04

    ... Nondiscrimination on the Basis of Age in Programs or Activities Receiving Federal Assistance from the Environmental... environmental exposure risks to children (targeting a specific age group) are taking actions based on... significant'' as defined under Executive Order 12866, and (2) concerns an environmental health or safety risk...

  9. 25 CFR 900.5 - Effect of these regulations on Federal program guidelines, manual, or policy directives.

    Science.gov (United States)

    2010-04-01

    ... SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT General Provisions § 900.5 Effect of these regulations... 25 Indians 2 2010-04-01 2010-04-01 false Effect of these regulations on Federal program guidelines, manual, or policy directives. 900.5 Section 900.5 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE...

  10. Perceptions of stakeholder groups about the participation of African American family forest landowners in federal landowner assistance programs

    Science.gov (United States)

    Puneet Dwivedi; Arundhati Jagadish; John Schelhas

    2016-01-01

    This study examines perceptions of three stakeholder groups (African American Family Forest Landowner, Government Agency, and Nonprofit) regarding federal landowner assistance programs in the southern United States by combining a SWOT (strength, weakness, opportunity, and threat) analysis with the AHP (analytical hierarchy process). Factors with the highest priority...

  11. 5 CFR 890.111 - Continuation of eligibility for former Federal employees of the Civilian Marksmanship Program.

    Science.gov (United States)

    2010-01-01

    ... pay of an individual described by paragraph (a) of this section an amount equal to the premiums withheld from the pay of a Federal employee for FEHB coverage and, in accordance with procedures... Department of Defense to support the Civilian Marksmanship Program as of the day before the date of the...

  12. 5 CFR 870.510 - Continuation of eligibility for former Federal employees of the Civilian Marksmanship Program.

    Science.gov (United States)

    2010-01-01

    ... paragraph (a) of this section an amount equal to the premiums withheld from the pay of a Federal employee... procedures established by OPM, pay into the Employees' Life Insurance Fund amounts equal to any agency... Defense to support the Civilian Marksmanship Program as of the day before the date of the transfer of the...

  13. 41 CFR 102-192.175 - What types of support does GSA offer to Federal agency mail management programs?

    Science.gov (United States)

    2010-07-01

    ... in mail management and mail operations; (b) Identifying better business practices and sharing them... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What types of support does GSA offer to Federal agency mail management programs? 102-192.175 Section 102-192.175 Public...

  14. Improving regulatory effectiveness in Federal/State siting actions. Need for power: determinants in the state decisionmaking processes. Final report

    International Nuclear Information System (INIS)

    Noble, J.B.; Hemphill, J.B.

    1978-03-01

    The Department of Energy's Nuclear Siting and Licensing Act of 1978 (S. 2775; H. R. 11704) proposes Federal/State coordination in need for facility decisionmaking for nuclear power stations. The present study examines the decisionmaking criteria used by forty-four States in making a determination of need for power/facility. Specific criteria are identified along with the number of States which make those criteria a primary or a secondary consideration in determining need for facility. Individual profiles of the studied States' decisionmaking criteria are provided. In addition, the study examines the different organizational and functional patterns found in the States' regulatory process to certificate power stations. The coordination or lack of coordination of the issuance of associated environmental permits required for power stations is outlined for each State. Information concerning States' rate treatment of expenses associated with the construction and operation of a power station is provided. The relationship between the need for power decisionmaking process and the ratemaking process is explored

  15. Planning the nuclear contribution to the Brazilian power program

    International Nuclear Information System (INIS)

    Barbalho, A. Rodrigues; Alves, R. Nazare; Pinto, C. Syllus M.; Souza Santos, T.D. de; Abrao, A.

    1977-01-01

    The thermo-electric power in Brazil accounts for less than 20% of the total generating capacity. Brazil's power is essentially generated hydraulically, which grants the growing development. The electric energy consumption keeps growing, with the annual average rate of 13%/year in the last five years. The present installed capacity is 20 000 MWe and the projections are: 35 000MWe, in 1980; 50 000 MWe in 1985; 75 000 MWe, in 1990 and 150 000 MWe, in 2 000. Most of the hydraulic resources are located in remote areas of the country, very far from the consumption centers. Under the agreement between the Federal Republic of Germany and Brazil (signed in June 1975), besides the nuclear power station, American made, under construction in Agra dos Reis, with a power capacity of 626 MWe, two more units, each one with 1 300 MWe capacity are to be erected at the same site, and planned to be in operation in 1982 and 1983. Several joint German-Brazilian companies will be established for reactor and fuel manufacture, in the country. The Brazilian state holding nuclear company, Empresas Nucleares Brasileiras S/A., NUCLEBRAS, will participate in the formation of all joint companies with at least 51% of capital investments. The Brazilian Government will spend 10 billion dollars (U.S.), during the agreement's duration, to make its industry stronger, to develop its technology and to reduce its dependence on energy imports. Brazil's target: full independence in nuclear technology (including reactor manufacture and complete fuel cycle) in about 15 years [es

  16. University role in nuclear power program in developing countries

    International Nuclear Information System (INIS)

    Notea, A.

    1977-01-01

    The academic education in nuclear engineering should be considered as a subsystem within the general nuclear program of the country as well as within the educational structure of the university. The academic trained personnel are of major importance as future participants in decisional and planning steps of the program. Hence, the ''production'' of academic manpower in this field should be started at the earliest steps. The nuclear engineering curriculum should be planned in accordance with the objectives stated by the power program and the challenges foreseen. Obviously, the objectives in a developing country are considerably different from those of developed countries highly advanced in the nuclear power field. The paper analyzes possible objectives in a developing country which intends to implement nuclear power program. In view of these objectives curricula planning for the undergraduate and graduate levels are presented and explained. The courses for undergraduates intend to provide basic information to relatively large numbers of students from various faculties, as they are expected to join the program at various constructional stages. Major emphasise is given to graduates as they will act in the cadre of senior engineers and officials of the country. The research works for theses in developed countries may be highly technical, dealing with crumbs of huge development project carried out on national or international level. Such research works are hardly justified in countries not involved in the project. In developing countries the problems to be confronted with are mainly licensing and siting and to much less extent nuclear power technology. Hence the choice of subjects for theses should be coherent with these directions. Obviously, the subjects are bound to the department manpower and budgetary limitations. As a demonstration two fields were analysed under our local constraints and objectives. Subjects suitable for theses are pointed out. The fields dealt

  17. Program change management during nuclear power plant decommissioning

    International Nuclear Information System (INIS)

    Bushart, Sean; Kim, Karen; Naughton, Michael

    2011-01-01

    Decommissioning a nuclear power plant is a complex project. The project involves the coordination of several different departments and the management of changing plant conditions, programs, and regulations. As certain project Milestones are met, the evolution of such plant programs and regulations can help optimize project execution and cost. This paper will provide information about these Milestones and the plant departments and programs that change throughout a decommissioning project. The initial challenge in the decommissioning of a nuclear plant is the development of a definitive plan for such a complex project. EPRI has published several reports related to decommissioning planning. These earlier reports provided general guidance in formulating a Decommissioning Plan. This Change Management paper will draw from the experience gained in the last decade in decommissioning of nuclear plants. The paper discusses decommissioning in terms of a sequence of major Milestones. The plant programs, associated plans and actions, and staffing are discussed based upon experiences from the following power reactor facilities: Maine Yankee Atomic Power Plant, Yankee Nuclear Power Station, and the Haddam Neck Plant. Significant lessons learned from other sites are also discussed as appropriate. Planning is a crucial ingredient of successful decommissioning projects. The development of a definitive Decommissioning Plan can result in considerable project savings. The decommissioning plants in the U.S. have planned and executed their projects using different strategies based on their unique plant circumstances. However, experience has shown that similar project milestones and actions applied through all of these projects. This allows each plant to learn from the experiences of the preceding projects. As the plant transitions from an operating plant through decommissioning, the reduction and termination of defunct programs and regulations can help optimize all facets of

  18. Factor of radioactive waste on nuclear power program

    International Nuclear Information System (INIS)

    Syed Abdul Malik Syed Zain

    2009-01-01

    Global warming phenomena and rising oil prices have brought the excitement of open space use of nuclear power. Arguments in favor of this technology range in terms of more environmentally friendly, energy diversification and cost efficiency has prompted the government to widen the choice of nuclear power be considered as a serious alternative. Despite the attractive factors to the use of these powers, there are also factors that stem from the continued development of nuclear power. These include the factor of safety, security, security of fuel supply, and public attention is often associated with radioactive waste management. This article attempts to debate specific to radioactive waste management factors that impact on public acceptance of a country's nuclear power program, especially in Malaysia. Starting from the absence of radioactive waste management policy to model uncertainty of the landfill and complications in selecting a repository site shows the basic infrastructure is still lacking. In addition, previous experience handling thorium waste has not reached a final settlement after several years of implementation. It reinforced the perception about the level of public confidence in the competence and attitude of local workers who are not very encouraging to pursue this advanced.

  19. PEP-II Large Power Supplies Rebuild Program at SLAC

    CERN Document Server

    de Lira, Antonio C; Lipari, James J; da Silva Rafael, Fernando

    2005-01-01

    At PEP-II, seven large power supplies (LGPS) are used to power quad magnets in the electron-positron collider region. The LGPS ratings range from 72kW to 270kW, and were installed in 1997. They are unipolar off-line switch mode supplies, with a 6 pulse bridge rectifying 480VAC, 3-phase input power to yield 650VDC unregulated. This unregulated 650VDC is then input into one (or two) IGBT H-bridges, which convert the DC into PWM 16 kHz square wave AC. This high frequency AC drives the primary side of a step-down transformer followed by rectifiers and low pass filters. Over the years, these LGPS have presented many problems mainly in their control circuits, making it difficult to troubleshoot and affecting the overall accelerator availability. A redesign/rebuilding program for these power supplies was established under the coordination of the Power Conversion Department at SLAC. During the 2004 accelerator summer shutdown all the control circuits in these supplies were redesigned and replaced. A new PWM control b...

  20. Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal Year 2018. Final rule.

    Science.gov (United States)

    2017-08-03

    This final rule updates the prospective payment rates for inpatient rehabilitation facilities (IRFs) for federal fiscal year (FY) 2018 as required by the statute. As required by section 1886(j)(5) of the Social Security Act (the Act), this rule includes the classification and weighting factors for the IRF prospective payment system's (IRF PPS) case-mix groups and a description of the methodologies and data used in computing the prospective payment rates for FY 2018. This final rule also revises the International Classification of Diseases, 10th Revision, Clinical Modification (ICD-10-CM) diagnosis codes that are used to determine presumptive compliance under the "60 percent rule," removes the 25 percent payment penalty for inpatient rehabilitation facility patient assessment instrument (IRF-PAI) late transmissions, removes the voluntary swallowing status item (Item 27) from the IRF-PAI, summarizes comments regarding the criteria used to classify facilities for payment under the IRF PPS, provides for a subregulatory process for certain annual updates to the presumptive methodology diagnosis code lists, adopts the use of height/weight items on the IRF-PAI to determine patient body mass index (BMI) greater than 50 for cases of single-joint replacement under the presumptive methodology, and revises and updates measures and reporting requirements under the IRF quality reporting program (QRP).

  1. Program Leadership from a Nordic Perspective - Program Leaders' Power to Influence Their Program

    DEFF Research Database (Denmark)

    Högfeldt, Anna-Karin; Strömberg, Emma; Jerbrant, Anna

    2013-01-01

    research demonstrated that program leaders have quite different positions, strategies and methods when it comes to monitoring and developing their programs. In this paper, a deeper investigation is carried out of the (im-) possibilities to make real influence on the study courses that constitutes...... the respective Engineering study programs. Eight program leaders from the five N5T universities have been interviewed, and the analysis of these studies, has culminated in a model for the analysis of program leadership for Engineering education development....

  2. Keeping current, June 1998. Issues 98: Securing the value of the federal Columbia River power system

    International Nuclear Information System (INIS)

    1998-06-01

    This report focuses on issues which will enhance the value of the Columbia River for the future. Many important decisions must be made about the Bonneville Power Administration in the coming months. These issues include the following: cost management; future fish and wildlife funding; power markets, revenues and subscription; transmission issues; and risk management

  3. Securing the Value of the Federal Columbia River Power System, Keeping Current, June 1998, Issue 98.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1998-06-01

    This report focuses on issues which will enhance the value of the Columbia River for the future. Many important decisions must be made about the Bonneville Power Administration in the coming months. These issues include the following: cost management; future fish and wildlife funding; power markets, revenues and subscription; transmission issues; and risk management.

  4. Annual report to Congress on Federal Government Energy Management and Conservation Programs

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    This report on Federal Energy Management for Fiscal year (FY) 1992 provides information on energy consumption in Federal buildings and operations and documents activities conducted by Federal agencies to meet the statutory requirements of Title V, Part 3, of the National Energy Conservation Policy Act (NECPA), as amended, 42 U.S.C. 8251-8261, and Title VIII of NECPA, 42 U.S.C. 8287-8287b. This report also describes the energy conservation and management activities of the Federal Government under the authorization of section 381 of the Energy Policy and Conservation Act (EPCA), as amended, 42 U.S.C. 6361. Implementation activities undertaken during FY 1992 by the Federal agencies under Executive Order 12759 on Federal Energy Management are also described in this report.

  5. 'Nuclearelectrica' Company messages for a broadly acceptable nuclear power program

    International Nuclear Information System (INIS)

    Stiopol, Mihaela; Bilegan, C. Iosif

    2001-01-01

    Romania started the nuclear power program about 20 years ago, by a high level Government decision. After 1989 the former Ministry of Electrical Power was transformed into a state owned company, RENEL, in which nuclear activities were also included. RENEL was a monopoly system responsible for production, transport and distribution of electricity in Romania. The deregulation process in the power sector was many times asked by the World Bank and International Monetary Fund, to split this monopoly system in separately activities: Production, Transport and Distribution. The first step occurred in July 1998, when the nuclear activities were externalized from RENEL. In nuclear sector two new entities were created: SN 'Nuclearelectrica' SA, a state own company that includes three branches: - Nuclear Power Production - Cernavoda NPP Unit 1; - Nuclear Fuel Plant-Pitesti; - Project Development Branch - Cernavoda Units 2-5. The second entity is the so-called Romanian Authority (Autonomous Reggie) for Nuclear Activities (RAAN), including as branches the heavy water fabrication plant 'ROMAG PROD', the Nuclear Research Institute (ICN) Pitesti and the Nuclear Engineering and Design Institute (CITON) Bucharest. The rest of conventional power sector was renamed, namely, CONEL. The organization process continued and in August 2000, by a Government Ordinance the CONEL was split into the following companies: - one for hydropower production 'HIDROELECTRICA'; - one for thermal power production 'TERMOELECTRICA'; - one for transport 'TRANSELECTRICA'; - one for distribution 'ELECTRICA'. The goal of a third step of restructuring process is the privatization in the power field. The steps of Romanian Power Sector Restructuring are presented. Since 1991 a Public Information program has been established. Depending on the evolution of the construction of the first Romanian nuclear power station, during the years, the messages changed. Everybody working in the nuclear field knows how difficult is

  6. Constitutional Principles and E-Government: An Opinion about Possible Effects of Federalism and the Separation of Powers on E-Government Policies.

    Science.gov (United States)

    Jaeger, Paul T.

    2002-01-01

    Examines how Constitutional principles, specifically the doctrines of Federalism and the separation of powers, relate to e-government policies and practices. Suggests that the move toward e-government, with emphasis on the simplification of access to government information and services, must be considered with regard to Federalism and separation…

  7. Navigating the high seas of Federal Programs to ensure usable science delivery

    Science.gov (United States)

    Bachelet, D. M.; Gough, M.; Baker, B.; Sheehan, T.; Mutch, T.; Brown, M.

    2016-12-01

    Oregon State University, University of Idaho, and the University of Washington. With much experience with local and regional managers and federal programs we will show examples of exciting successes and report on some challenges in coordinating exchanges and extracting valuable feedback to improve the usability of web applications.

  8. ORNL superconducting technology program for electric power systems

    Science.gov (United States)

    Hawsey, R. A.

    1994-04-01

    The Oak Ridge National Laboratory (ORNL) Superconducting Technology Program is conducted as part of a national effort by the US Department of Energy's Office of Energy Efficiency and Renewable Energy to develop the technology base needed by US industry for commercial development of electric power applications of high-temperature superconductivity. The two major elements of this program are conductor development and applications development. This document describes the major research and development activities for this program together with related accomplishments. The technical progress reported was summarized from information prepared for the FY 1993 Annual Program Review held July 28--29, 1993. This ORNL program is highly leveraged by the staff and other resources of US industry and universities. In fact, nearly three-fourths of the ORNL effort is devoted to industrial competitiveness projects with private companies. Interlaboratory teams are also in place on a number of industry-driven projects. Patent disclosures, working group meetings, staff exchanges, and joint publications and presentations ensure that there is technology transfer to US industry. Working together, the collaborative teams are making rapid progress in solving the scientific and technical issues necessary for the commercialization of long lengths of practical high-temperature superconductor wire and wire products.

  9. 2004 Power marketing program, draft environmental impact statement

    International Nuclear Information System (INIS)

    1996-04-01

    The Sierra Nevada Region proposes to develop a marketing plan that would be implemented in the year 2005 and to allocate power to eligible entities within its marketing area in northern and central California and Nevada. Four alternatives were analyzed that are structured around the range of operations of the Central Valley Project hydroelectric system, levels of power purchases, and customer group allocations. The manner in which hydropower Generating plants are operated is one of the fundamental differences across the alternatives. Operating the hydrosystem to provide peaking power (the maximize hydropower peaking alternative, which is similar to the no-action alternative), would provide up to 941 MW of additional load-carrying capacity in comparison to baseload operations of the CVP system (the baseload alternative). Although it is not possible to determine where or when any lost capacity would be made up, building replacement capacity in response to the baseload alternative would result in land-use impacts and the use of natural and financial resources. Peaking also results in small but beneficial regional economic effects. Peaking and baseload alternatives result in different hourly air emission patterns. The peaking alternative results in annual reductions in air pollution and wastewater. Impacts within the CVP are limited to regulating reservoirs, which would have reduced pool-level fluctuations under the baseload alternative. Changes in allocations to customer groups result in small regional effects that are dependent on assumptions made about customer access to wholesale energy markets. The renewable resource acquisition alternative assumes that technology improvements allow for competitively melding 250 MW of renewables with Federal hydropower. Environmental impacts of the renewables alternative depend on the presence of biomass in the resource mix. Overall, the 2004 Draft Environmental Impact Statement (2004 EIS) identified no significant impacts

  10. The Changing Workforce. Comparison of Federal and Nonfederal Work/Family Programs and Approaches.

    Science.gov (United States)

    General Accounting Office, Washington, DC. General Government Div.

    The tremendous growth in the number of women in the labor force has dramatically changed the world of work. Traditional human resources policies were not designed for this new workforce. Federal regulations prohibit federal workers from using any of their sick leave to care for a child or a parent. To learn about nonfederal work/family efforts,…

  11. 78 FR 77365 - Federal Employees' Group Life Insurance Program: Options B and C

    Science.gov (United States)

    2013-12-23

    ... #0; #0;Proposed Rules #0; Federal Register #0; #0; #0;This section of the FEDERAL REGISTER contains notices to the public of #0;the proposed issuance of rules and regulations. The purpose of these #0;notices is to give interested persons an opportunity to participate in #0;the rule making prior to...

  12. The Federal Depository Library Program (FDLP), Academic Libraries, and Access to Government Information

    Science.gov (United States)

    Jaeger, Paul T.; Bertot, John Carlo; Shuler, John A.

    2010-01-01

    The electronic environment has significantly shifted library capabilities and user expectations for the delivery of government information and services. At the same time, many laws of the federal government have pushed for the creation and distribution of government information through electronic channels. However, the Federal Depository Library…

  13. 76 FR 38548 - Competitive and Noncompetitive Nonformula Federal Assistance Programs-Administrative Provisions...

    Science.gov (United States)

    2011-07-01

    ... non-Federal cost-share is a percentage of project cost, not Federal funds awarded. List of Subjects in... follows: Sec. 3430.705 Funding restrictions. (a) Facility costs. Funds made available under this subpart... amended to make minor revisions to the facility cost prohibition for purposes of consistency with other...

  14. Nuclear Power Engineering Education Program, University of Illinois

    International Nuclear Information System (INIS)

    Jones, B.G.

    1993-01-01

    The DOE/CECo Nuclear Power Engineering Education Program at the University of Illinois in its first year has significantly impacted the quality of the power education which our students receive. It has contributed to: the recently completed upgrade of the console of our Advanced TRIGA reactor which increases the reactor's utility for training, the procurement of new equipment to upgrade and refurbish several of the undergraduate laboratory set-ups, and the procurement of computational workstations in support of the instructional computing laboratory. In addition, smaller amounts of funds were used for the recruitment and retention of top quality graduate students, the support of faculty to visit other institutions to attract top students into the discipline, and to provide funds for faculty to participate in short courses to improve their skills and background in the power area. These items and activities have helped elevate in the student's perspective the role of nuclear power in the discipline. We feel this is having a favorable impact on student career selection and on ensuring the continued supply of well educated nuclear engineering graduates

  15. High Performance Computing - Power Application Programming Interface Specification.

    Energy Technology Data Exchange (ETDEWEB)

    Laros, James H.,; Kelly, Suzanne M.; Pedretti, Kevin; Grant, Ryan; Olivier, Stephen Lecler; Levenhagen, Michael J.; DeBonis, David

    2014-08-01

    Measuring and controlling the power and energy consumption of high performance computing systems by various components in the software stack is an active research area [13, 3, 5, 10, 4, 21, 19, 16, 7, 17, 20, 18, 11, 1, 6, 14, 12]. Implementations in lower level software layers are beginning to emerge in some production systems, which is very welcome. To be most effective, a portable interface to measurement and control features would significantly facilitate participation by all levels of the software stack. We present a proposal for a standard power Application Programming Interface (API) that endeavors to cover the entire software space, from generic hardware interfaces to the input from the computer facility manager.

  16. Final argument relating to the Canadian nuclear power program

    International Nuclear Information System (INIS)

    Robertson, J.A.L.

    1978-05-01

    This report is the second brief, and one of a number of documents, submitted by Atomic Energy of Canada Limited (AECL) to the Ontario Royal Commission on Electric Power Planning. It is intended to update the original brief (AECL--5800) with respect to those matters that emerged during the course of the hearings and which had not been fully anticipated in that brief, as well as to summarize the AECL position on the various issues. To enable it to qualify as a ''final argument'' it contains only evidence or material that has been presented to the Royal Commission and is provided with marginal notations identifying the source of each section. It is AECL's position that the Canadian nuclear power program provides a safe, proven and efficient means of making a needed contribution to electricity supply, while strengthening the economy through the deployment of indigenous technology and resources. (author)

  17. Compensatory charge as guarantee of power supply. [Federal Republic of Germany]. Finanzwissenschaftliches Forschungsinstitut an der Universitaet zu Koeln. Sonderveroeffentlichung

    Energy Technology Data Exchange (ETDEWEB)

    Voss, A

    1981-01-01

    First, the legal base of the compensatory charge is described, followed by an evaluation of its revenue systematics. Since the compensatory charge revenue does not go into the federal budget, but to a special fund, a budget evaluation follows. In the framework of a financial evaluation, the effects of imposing this charge are investigated. The differences between a political assessment and a financial evaluation of this charge are shown by giving MP statements made. According to the present situation, it is also possible to combine the various purposes of power taxation in an ingeniously contrieved manner under the aspects of finance and psychology. It follows that a power tax might still be levied at a time when the original purpose of its introduction is no longer applicable.

  18. Improving human reliability through better nuclear power plant system design: Program for advanced nuclear power studies

    International Nuclear Information System (INIS)

    Golay, M.W.

    1993-01-01

    The project on ''Development of a Theory of the Dependence of Human Reliability upon System Designs as a Means of Improving Nuclear Power Plant Performance'' was been undertaken in order to address the problem of human error in advanced nuclear power plant designs. Lack of a mature theory has retarded progress in reducing likely frequencies of human errors. Work being pursued in this project is to perform a set of experiments involving human subjects who are required to operate, diagnose and respond to changes in computer-simulated systems, relevant to those encountered in nuclear power plants, which are made to differ in complexity in a systematic manner. The computer program used to present the problems to be solved also records the response of the operator as it unfolds

  19. Severe accident management program at Cofrentes Nuclear Power Plant

    International Nuclear Information System (INIS)

    Borondo, L.; Serrano, C.; Fiol, M.J.; Sanchez, A.

    2000-01-01

    Cofrentes Nuclear Power Plant (GE BWR/6) has implemented its specific Severe Accident Management Program within this year 2000. New organization and guides have been developed to successfully undertake the management of a severe accident. In particular, the Technical Support Center will count on a new ''Severe Accident Management Team'' (SAMT) which will be in charge of the Severe Accident Guides (SAG) when Control Room Crew reaches the Emergency Operation Procedures (EOP) step that requires containment flooding. Specific tools and training have also been developed to help the SAMT to mitigate the accident. (author)

  20. On the Expressive Power of Temporal Concurrent Constraint Programming Languages

    DEFF Research Database (Denmark)

    Nielsen, Mogens; Palamidessi, Catuscia; Valencia, Frank D.

    2002-01-01

    The tcc paradigm is a formalism for timed concurrent constraint programming. Several tcc languages differing in their way of expressing infinite behavior have been proposed in the literature. In this paper we study the expressive power of some of these languages. In particular, we show that: (1......) recursive procedures with parameters can be encoded into parameterless recursive procedures with dynamic scoping, and viceversa. (2) replication can be encoded into parameterless recursive procedures with static scoping, and viceversa. (3) the languages from (1) are strictly more expressive than...

  1. China's Nuclear Power Program: Options for the US

    International Nuclear Information System (INIS)

    Suttmeier, R.P.

    1985-01-01

    The issue of American nuclear cooperation with the People's Republic of China is examined with regards to political relations, commercial benefits to the United States, and nonproliferation. China's interest in nuclear power is examined, and its nuclear program is briefly reviewed from the 1950's to present. China's international nuclear relations with other countries are discussed, and implications for the United States examined, particularly with regards to China's intentions toward nuclear proliferation, danger of diversion of material for nuclear weapons, use of pressurized water reactor technology for Chinese naval reactors, and the terms of the nuclear cooperation agreement

  2. Whistleblowers ask Congress to investigate TVA's nuclear power program

    International Nuclear Information System (INIS)

    Lane, E.

    1993-01-01

    Congress should investigate the Tennessee Valley Authority's nuclear power plant construction and operations programs as soon as possible, a coalition of Tennessee environmentalists and whistleblowers told reporters at a press conference in Washington, DC. The Foundation for Global Sustainability and four employees of TVA nuclear plants called for congressional action because they contend the Nuclear Regulatory Commission and the Department of Labor have failed to act to protect whistleblowers who report nuclear safety problems. The foundation contends the economics of nuclear plant construction by TVA do not make sense and in the rush to finish the Watts Bar nuclear plant, which has been under construction for 20 years, TVA has ignored safety issues

  3. Professional development for nuclear power programs in developing countries

    International Nuclear Information System (INIS)

    Kanter, M.A.

    1983-01-01

    Countries entering nuclear power programs for the first time find that inadequate planning for the development of trained manpower is a critical factor in the success of their programs. This requires the early training of a team for the planning and acquisition effort to be followed by training for the supervision of construction. In addition, there is the more readily recognized training for operation. Typical manpower needs for such projects have been documented by the International Atomic Energy Agency. The basic academic training of engineers and scientists, which should be available within the country; advanced academic training, which is often secured in institutions abroad; specialized training abroad by international agencies; specialized training by the vendors of nuclear equipment; and the development of indigenous training. This paper outlines all of these avenues but will concentrate on the training available through international agencies and on the development of indigenous training capability

  4. Perry Nuclear Power Plant Area/Equipment Temperature Monitoring Program

    International Nuclear Information System (INIS)

    McGuire, L.L.

    1991-01-01

    The Perry Nuclear Power Plant Area/Equipment Temperature Monitoring Program serves two purposes. The first is to track temperature trends during normal plant operation in areas where suspected deviations from established environmental profiles exist. This includes the use of Resistance Temperature Detectors, Recorders, and Temperature Dots for evaluation of equipment qualified life for comparison with tested parameters and the established Environmental Design Profile. It also may be used to determine the location and duration of steam leaks for effect on equipment qualified life. The second purpose of this program is to aid HVAC design engineers in determining the source of heat outside anticipated design parameters. Resistance Temperature Detectors, Recorders, and Temperature Dots are also used for this application but the results may include design changes to eliminate the excess heat or provide qualified equipment (cable) to withstand the elevated temperature, splitting of environmental zones to capture accurate temperature parameters, or continued environmental monitoring for evaluation of equipment located in hot spots

  5. Nuclear waste management: a challenge to Federalism

    International Nuclear Information System (INIS)

    Lucas, P.

    1979-01-01

    The controversy over state/Federal authority over waste disposal has already had a significant effect regardless of the choice Congress ultimately makes between an informal deference to state will and a statutory authorization of state control over Federal repositories. The highly emotional issue of local disposal of nuclear waste and the assertions of state control over waste disposal have made the nation and the Federal bureaucracy more aware of the status of the waste management program. State resistance to Federal siting efforts and the passage of state waste disposal legislation has compelled the Federal government to provide the states with a larger role in waste management. State power to exclude Federal repositories would give states additional political leverage. Ideally, public attention and effective state veto power will contribute to a more successful program, without impeding progress toward the immediate goal of siting and developing permanent repositories

  6. Federal Student Loan Programs: Opportunities Exist to Improve Audit Requirements and Oversight Procedures. Report to Congressional Committees. GAO-10-668

    Science.gov (United States)

    Daly, Kay L.

    2010-01-01

    The Higher Education Opportunity Act of 2008, Pub. L. No. 110-315, mandated GAO (Government Accountability Office) to study the financial and compliance audits and reviews required or conducted for the Federal Family Education Loan (FFEL) program and the Federal Direct Student Loan (DL) program. The Department of Education's (Education) Office of…

  7. 76 FR 23795 - Low-Power Television and Translator Upgrade Program: Notice of Final Closing Date

    Science.gov (United States)

    2011-04-28

    .... 110418247-1247-01] Low-Power Television and Translator Upgrade Program: Notice of Final Closing Date AGENCY... receipt of applications for the Low-Power Television and Translator Upgrade Program (Upgrade Program) will... Rules to Establish Rules for Digital Low Power Television, Television Translator, and Television Booster...

  8. Nuclear power reactor analysis, methods, algorithms and computer programs

    International Nuclear Information System (INIS)

    Matausek, M.V

    1981-01-01

    Full text: For a developing country buying its first nuclear power plants from a foreign supplier, disregarding the type and scope of the contract, there is a certain number of activities which have to be performed by local stuff and domestic organizations. This particularly applies to the choice of the nuclear fuel cycle strategy and the choice of the type and size of the reactors, to bid parameters specification, bid evaluation and final safety analysis report evaluation, as well as to in-core fuel management activities. In the Nuclear Engineering Department of the Boris Kidric Institute of Nuclear Sciences (NET IBK) the continual work is going on, related to the following topics: cross section and resonance integral calculations, spectrum calculations, generation of group constants, lattice and cell problems, criticality and global power distribution search, fuel burnup analysis, in-core fuel management procedures, cost analysis and power plant economics, safety and accident analysis, shielding problems and environmental impact studies, etc. The present paper gives the details of the methods developed and the results achieved, with the particular emphasis on the NET IBK computer program package for the needs of planning, construction and operation of nuclear power plants. The main problems encountered so far were related to small working team, lack of large and powerful computers, absence of reliable basic nuclear data and shortage of experimental and empirical results for testing theoretical models. Some of these difficulties have been overcome thanks to bilateral and multilateral cooperation with developed countries, mostly through IAEA. It is the authors opinion, however, that mutual cooperation of developing countries, having similar problems and similar goals, could lead to significant results. Some activities of this kind are suggested and discussed. (author)

  9. The US federal framework for research on endocrine disrupters and an analysis of research programs supported during fiscal year 1996

    Science.gov (United States)

    Reiter, L.W.; DeRosa, C.; Kavlock, R.J.; Lucier, G.; Mac, M.J.; Melillo, J.; Melnick, R.L.; Sinks, T.; Walton, B.T.

    1998-01-01

    The potential health and ecological effects of endocrine disrupting chemicals has become a high visibility environmental issue. The 1990s have witnessed a growing concern, both on the part of the scientific community and the public, that environmental chemicals may be causing widespread effects in humans and in a variety of fish and wildlife species. This growing concern led the Committee on the Environment and Natural Resources (CENR) of the National Science and Technology Council to identify the endocrine disrupter issue as a major research initiative in early 1995 and subsequently establish an ad hoc Working Group on Endocrine Disrupters. The objectives of the working group are to 1) develop a planning framework for federal research related to human and ecological health effects of endocrine disrupting chemicals; 2) conduct an inventory of ongoing federal research programs; and 3) identify research gaps and develop a coordinated interagency plan to address priority research needs. This communication summarizes the activities of the federal government in defining a common framework for planning an endocrine disrupter research program and in assessing the status of the current effort. After developing the research framework and compiling an inventory of active research projects supported by the federal government in fiscal year 1996, the CENR working group evaluated the current federal effort by comparing the ongoing activities with the research needs identified in the framework. The analysis showed that the federal government supports considerable research on human health effects, ecological effects, and exposure assessment, with a predominance of activity occurring under human health effects. The analysis also indicates that studies on reproductive development and carcinogenesis are more prevalent than studies on neurotoxicity and immunotoxicity, that mammals (mostly laboratory animals) are the main species under study, and that chlorinated dibenzodioxins and

  10. Program Potential: Estimates of Federal Energy Cost Savings from Energy Efficient Procurement

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, Margaret [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Fujita, K. Sydny [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-09-17

    In 2011, energy used by federal buildings cost approximately $7 billion. Reducing federal energy use could help address several important national policy goals, including: (1) increased energy security; (2) lowered emissions of greenhouse gases and other air pollutants; (3) increased return on taxpayer dollars; and (4) increased private sector innovation in energy efficient technologies. This report estimates the impact of efficient product procurement on reducing the amount of wasted energy (and, therefore, wasted money) associated with federal buildings, as well as on reducing the needless greenhouse gas emissions associated with these buildings.

  11. Dynamic Power Management for Portable Hybrid Power-Supply Systems Utilizing Approximate Dynamic Programming

    Directory of Open Access Journals (Sweden)

    Jooyoung Park

    2015-05-01

    Full Text Available Recently, the optimization of power flows in portable hybrid power-supply systems (HPSSs has become an important issue with the advent of a variety of mobile systems and hybrid energy technologies. In this paper, a control strategy is considered for dynamically managing power flows in portable HPSSs employing batteries and supercapacitors. Our dynamic power management strategy utilizes the concept of approximate dynamic programming (ADP. ADP methods are important tools in the fields of stochastic control and machine learning, and the utilization of these tools for practical engineering problems is now an active and promising research field. We propose an ADP-based procedure based on optimization under constraints including the iterated Bellman inequalities, which can be solved by convex optimization carried out offline, to find the optimal power management rules for portable HPSSs. The effectiveness of the proposed procedure is tested through dynamic simulations for smartphone workload scenarios, and simulation results show that the proposed strategy can successfully cope with uncertain workload demands.

  12. 75 FR 4805 - Electricity Market Transparency Provisions of Section 220 of the Federal Power Act

    Science.gov (United States)

    2010-01-29

    ... Commission's jurisdiction for other purposes. \\1\\ At present, all public utilities, including power marketers... role.\\21\\ Because numerous market participants that are excluded from the Commission's section 205 jurisdiction do not file EQRs, a jurisdictional seller's market presence (i.e., its role in price formation) is...

  13. Impacts of Federal Tax Credit Extensions on Renewable Deployment and Power Sector Emissions

    Energy Technology Data Exchange (ETDEWEB)

    Trieu Mai, Wesley Cole, Eric Lantz, Cara Marcy, and Benjamin Sigrin

    2016-02-01

    The report examines the impacts of the tax credit extensions under two distinct natural gas price futures, as the price of natural gas has been a key factor influencing the economic competitiveness of new renewable energy development. The analysis finds that, in both natural gas price cases, tax credit extensions can spur renewable capacity investments at least through the early 2020s, and can help lower CO2 emissions from the U.S. electricity system. Federal tax credits for renewable energy, particularly the wind production tax credit (PTC) and the solar investment tax credit (ITC), have offered financial incentives for renewable energy deployment over the last two decades in the United States. In December 2015, the wind and solar tax credits were extended by five years from their prior scheduled expiration dates, but ramp down in tax credit value during the latter years of the five-year period.

  14. Examining the Small Renewable Energy Power (SREP) Program in Malaysia

    Energy Technology Data Exchange (ETDEWEB)

    Sovacool, Benjamin K., E-mail: bsovacool@nus.edu.sg [Lee Kuan Yew School of Public Policy, National University of Singapore, 469C Bukit Timah Road, Singapore 259772 (Singapore); Drupady, Ira Martina [Lee Kuan Yew School of Public Policy, National University of Singapore, 469C Bukit Timah Road, Singapore 259772 (Singapore)

    2011-11-15

    The Small Renewable Energy Power (SREP) Program was the premier policy mechanism implemented by the national government to promote small-scale renewable electricity in Malaysia from 2001 to 2010. However, it managed meet less than 3 percent of its original goal by 2005. This study investigates what happened. More specifically, using a qualitative semi-structured interview approach with data presented in a narrative format, it answers the following five questions: (1) What are the primary energy policy and security challenges facing Malaysia? (2) What were the drivers behind the SREP in Malaysia? (3) What were the major benefits arising from the SREP? (4) What were the significant challenges to implementation? (5) What lessons or insights does the SREP offer for the study of energy policy design and implementation more generally? We find that the SREP failed to achieve its targets due to capacity caps, a lengthy approval process, lack of monitoring, exclusion of stakeholders, and few (if any) pre-feasibility studies. Other factors explaining its poor performance include opposition from the national utility Tenaga Nasional Berhad and electricity tariffs unmatched with true production costs. - Highlights: > The Small Renewable Energy Power Program aimed to install 500 MW by 2005. > It installed only 12 MW by December 2005. > This study investigates why the SREP failed to achieve its targets.

  15. Examining the Small Renewable Energy Power (SREP) Program in Malaysia

    International Nuclear Information System (INIS)

    Sovacool, Benjamin K.; Drupady, Ira Martina

    2011-01-01

    The Small Renewable Energy Power (SREP) Program was the premier policy mechanism implemented by the national government to promote small-scale renewable electricity in Malaysia from 2001 to 2010. However, it managed meet less than 3 percent of its original goal by 2005. This study investigates what happened. More specifically, using a qualitative semi-structured interview approach with data presented in a narrative format, it answers the following five questions: (1) What are the primary energy policy and security challenges facing Malaysia? (2) What were the drivers behind the SREP in Malaysia? (3) What were the major benefits arising from the SREP? (4) What were the significant challenges to implementation? (5) What lessons or insights does the SREP offer for the study of energy policy design and implementation more generally? We find that the SREP failed to achieve its targets due to capacity caps, a lengthy approval process, lack of monitoring, exclusion of stakeholders, and few (if any) pre-feasibility studies. Other factors explaining its poor performance include opposition from the national utility Tenaga Nasional Berhad and electricity tariffs unmatched with true production costs. - Highlights: → The Small Renewable Energy Power Program aimed to install 500 MW by 2005. → It installed only 12 MW by December 2005. → This study investigates why the SREP failed to achieve its targets.

  16. Integration of structural health monitoring solutions onto commercial aircraft via the Federal Aviation Administration structural health monitoring research program

    Science.gov (United States)

    Swindell, Paul; Doyle, Jon; Roach, Dennis

    2017-02-01

    The Federal Aviation Administration (FAA) started a research program in structural health monitoring (SHM) in 2011. The program's goal was to understand the technical gaps of implementing SHM on commercial aircraft and the potential effects on FAA regulations and guidance. The program evolved into a demonstration program consisting of a team from Sandia National Labs Airworthiness Assurance NDI Center (AANC), the Boeing Corporation, Delta Air Lines, Structural Monitoring Systems (SMS), Anodyne Electronics Manufacturing Corp (AEM) and the FAA. This paper will discuss the program from the selection of the inspection problem, the SHM system (Comparative Vacuum Monitoring-CVM) that was selected as the inspection solution and the testing completed to provide sufficient data to gain the first approved use of an SHM system for routine maintenance on commercial US aircraft.

  17. Quality Managment Program (QMP) report: A review of quality management programs developed in response to Title 10, Section 35.32 of the Code of Federal Regulations

    Energy Technology Data Exchange (ETDEWEB)

    Witte, M.C.

    1994-10-01

    In July of 1991, the Nuclear Regulatory Commission published a Final Rule in the Federal Register amending regulations governing medical therapeutic administrations of byproduct material and certain uses of radioactive sodium iodide. These amendments required implementation of a Quality Management Program (QMP) to provide high confidence that the byproduct material -- or radiation from byproduct material -- will be administered as directed by an authorized user physician. Herein, this rule is referred to as the QM rule. The Final Rule was published after two proposed rules had been published in the Federal Register.

  18. Report of fiscal 1999 basic survey for promoting joint implementation, etc. Combined cycle power generation project for Surgut No.1 power station in the Russian Federation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This paper explains fiscal 1999 survey on a combined cycle power generation project for Surgut power plant in the Russian Federation for the purpose of making the project tied to the COP3 joint implementation. This power plant consists of 16 units with the total capacity of 3,300 MW. This project is to replace the existing superannuated No.1 through No.6 units with a new high-efficiency gas combined cycle power plant. The project plant is planned to comprise of three units, having the capacity of 417 MW, each consisting of one gas turbine and one steam turbine. The average generation efficiency will be improved tremendously from the present 37.2% to 55.2%. The initial investment will be 615 million in US dollars (at 109.2 yen/dollar). Energy saving will be 634,800 toe/year, with cost to effect 9,452 toe-y/million yen. Greenhouse effect gas reduction will be 1,509,000 t-CO2/year, with cost to effect 22.5 t-CO2-y/million yen. The investment recovery period is estimated to be 24 years. The Russian side strongly wishes to be granted a finance on a favorable terms and conditions to realize this project. It is possible that the Russian government requests Japan for grant of the Yen credit. Accordingly, an early start is necessary in order to deal with such request. (NEDO)

  19. 78 FR 19917 - Medicaid Program; Increased Federal Medical Assistance Percentage Changes Under the Affordable...

    Science.gov (United States)

    2013-04-02

    ... Care Act expanded Medicaid eligibility from 100 percent of the Federal Poverty Level (FPL) to 133... FMAP. Although some commenters supported flexibility in concept, the overall position favored in the...

  20. Annual report to Congress on Federal Government energy management and conservation programs, Fiscal year 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-06

    This report provides sinformation on energy consumption in Federal buildings and operations and documents activities conducted by Federal agencies to meet statutory requirements of the National Energy Conservation Policy Act. It also describes energy conservation and management activities of the Federal Government under section 381 of the Energy Policy and Conservation Act. Implementation activities undertaken during FY94 by the Federal agencies under the Energy Policy Act of 1992 and Executive Orders 12759 and 12902 are also described. During FY94, total (gross) energy consumption of the US Government, including energy consued to produce, process, and transport energy, was 1.72 quadrillion Btu. This represents {similar_to}2.0% of the total 85.34 quads used in US.