WorldWideScience

Sample records for fault program interim

  1. Interim reliability evaluation program, Browns Ferry fault trees

    International Nuclear Information System (INIS)

    Stewart, M.E.

    1981-01-01

    An abbreviated fault tree method is used to evaluate and model Browns Ferry systems in the Interim Reliability Evaluation programs, simplifying the recording and displaying of events, yet maintaining the system of identifying faults. The level of investigation is not changed. The analytical thought process inherent in the conventional method is not compromised. But the abbreviated method takes less time, and the fault modes are much more visible

  2. Interim reliability-evaluation program: analysis of the Browns Ferry, Unit 1, nuclear plant. Appendix B - system descriptions and fault trees

    International Nuclear Information System (INIS)

    Mays, S.E.; Poloski, J.P.; Sullivan, W.H.; Trainer, J.E.; Bertucio, R.C.; Leahy, T.J.

    1982-07-01

    This report describes a risk study of the Browns Ferry, Unit 1, nuclear plant. The study is one of four such studies sponsored by the NRC Office of Research, Division of Risk Assessment, as part of its Interim Reliability Evaluation Program (IREP), Phase II. This report is contained in four volumes: a main report and three appendixes. Appendix B provides a description of Browns Ferry, Unit 1, plant systems and the failure evaluation of those systems as they apply to accidents at Browns Ferry. Information is presented concerning front-line system fault analysis; support system fault analysis; human error models and probabilities; and generic control circuit analyses

  3. Interim reliability evaluation program (IREP)

    International Nuclear Information System (INIS)

    Carlson, D.D.; Murphy, J.A.

    1981-01-01

    The Interim Reliability Evaluation Program (IREP), sponsored by the Office of Nuclear Regulatory Research of the US Nuclear Regulatory Commission, is currently applying probabilistic risk analysis techniques to two PWR and two BWR type power plants. Emphasis was placed on the systems analysis portion of the risk assessment, as opposed to accident phenomenology or consequence analysis, since the identification of risk significant plant features was of primary interest. Traditional event tree/fault tree modeling was used for the analysis. However, the study involved a more thorough investigation of transient initiators and of support system faults than studies in the past and substantially improved techniques were used to quantify accident sequence frequencies. This study also attempted to quantify the potential for operator recovery actions in the course of each significant accident

  4. 40 CFR 80.141 - Interim detergent gasoline program.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Interim detergent gasoline program. 80... (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Detergent Gasoline § 80.141 Interim detergent gasoline... apply to: (i) All gasoline sold or transferred to a party who sells or transfers gasoline to the...

  5. 78 FR 67442 - Congestion Mitigation and Air Quality Improvement Program Interim Guidance

    Science.gov (United States)

    2013-11-12

    ...] Congestion Mitigation and Air Quality Improvement Program Interim Guidance AGENCY: Federal Highway... Comment. SUMMARY: The FHWA is issuing Interim Guidance on the Congestion Mitigation and Air Quality.../environment/air_quality/cmaq/policy_and_guidance/2008_guidance/ guidance/. DATES: This Interim Guidance is...

  6. Federal Interim Storage program

    International Nuclear Information System (INIS)

    Johnson, E.R.; McBride, J.A.

    1984-01-01

    The DOE has developed a program for providing Federal Interim Storage servies for spent nuclear fuel which complies with the requirements of the Nuclear Waste Policy Act of 1982. Although very little constructive activity in providing storage facilities can be undertaken by DOE until fuel has been certified by NRC as eligible for FIS, DOE planning and background information is such as to provide reasonable assurance that its obligations can be fulfilled when the required certifications have been issued. A fee structure providing fuel recovery of all costs associated with the FIS program, as required by the Act, has been developed. It provides for an equitable distribution of costs among users, based on the quantity of fuel requiring storage

  7. National NIF Diagnostic Program Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  8. 78 FR 70244 - Electronic Interim Assistance Reimbursement Program

    Science.gov (United States)

    2013-11-25

    ..., Social Security Online, at http://www.socialsecurity.gov . SUPPLEMENTARY INFORMATION: Background To be... SOCIAL SECURITY ADMINISTRATION 20 CFR Part 416 [Docket No. SSA-2011-0104] RIN 0960-AH45 Electronic Interim Assistance Reimbursement Program AGENCY: Social Security Administration. ACTION: Notice of...

  9. Fusion Breeder Program interim report

    International Nuclear Information System (INIS)

    Moir, R.; Lee, J.D.; Neef, W.

    1982-01-01

    This interim report for the FY82 Fusion Breeder Program covers work performed during the scoping phase of the study, December, 1981-February 1982. The goals for the FY82 study are the identification and development of a reference blanket concept using the fission suppression concept and the definition of a development plan to further the fusion breeder application. The context of the study is the tandem mirror reactor, but emphasis is placed upon blanket engineering. A tokamak driver and blanket concept will be selected and studied in more detail during FY83

  10. TREDRA, Minimal Cut Sets Fault Tree Plot Program

    International Nuclear Information System (INIS)

    Fussell, J.B.

    1983-01-01

    1 - Description of problem or function: TREDRA is a computer program for drafting report-quality fault trees. The input to TREDRA is similar to input for standard computer programs that find minimal cut sets from fault trees. Output includes fault tree plots containing all standard fault tree logic and event symbols, gate and event labels, and an output description for each event in the fault tree. TREDRA contains the following features: a variety of program options that allow flexibility in the program output; capability for automatic pagination of the output fault tree, when necessary; input groups which allow labeling of gates, events, and their output descriptions; a symbol library which includes standard fault tree symbols plus several less frequently used symbols; user control of character size and overall plot size; and extensive input error checking and diagnostic oriented output. 2 - Method of solution: Fault trees are generated by user-supplied control parameters and a coded description of the fault tree structure consisting of the name of each gate, the gate type, the number of inputs to the gate, and the names of these inputs. 3 - Restrictions on the complexity of the problem: TREDRA can produce fault trees with a minimum of 3 and a maximum of 56 levels. The width of each level may range from 3 to 37. A total of 50 transfers is allowed during pagination

  11. Interim reliability evaluation program: analysis of the Arkansas Nuclear One. Unit 1 Nuclear Power Plant

    International Nuclear Information System (INIS)

    Kolb, G.J.; Kunsman, D.M.; Bell, B.J.

    1982-06-01

    This report represents the results of the analysis of Arkansas Nuclear One (ANO) Unit 1 nuclear power plant which was performed as part of the Interim Reliability Evaluation Program (IREP). The IREP has several objectives, two of which are achieved by the analysis presented in this report. These objectives are: (1) the identification, in a preliminary way, of those accident sequences which are expected to dominate the public health and safety risks; and (2) the development of state-of-the-art plant system models which can be used as a foundation for subsequent, more intensive applications of probabilistic risk assessment. The primary methodological tools used in the analysis were event trees and fault trees. These tools were used to study core melt accidents initiated by loss of coolant accidents (LOCAs) of six different break size ranges and eight different types of transients

  12. Hazardous waste management programs; Florida: authorization for interim authorization phase I--Environmental Protection Agency. Notice of final determination.

    Science.gov (United States)

    1982-05-07

    The State of Florida has applied for interim Authorization Phase I. EPA has reviewed Florida's application for Phase I and has determined that Florida's hazardous waste program is substantially equivalent to the Federal program covered by Phase I. The State of Florida is, hereby, granted Interim Authorization for Phase I to operate the State 's hazardous waste program, in lieu of the Federal program.

  13. Interim Reliability Evaluation Program procedures guide

    International Nuclear Information System (INIS)

    Carlson, D.D.; Gallup, D.R.; Kolaczkowski, A.M.; Kolb, G.J.; Stack, D.W.; Lofgren, E.; Horton, W.H.; Lobner, P.R.

    1983-01-01

    This document presents procedures for conducting analyses of a scope similar to those performed in Phase II of the Interim Reliability Evaluation Program (IREP). It documents the current state of the art in performing the plant systems analysis portion of a probabilistic risk assessment. Insights gained into managing such an analysis are discussed. Step-by-step procedures and methodological guidance constitute the major portion of the document. While not to be viewed as a cookbook, the procedures set forth the principal steps in performing an IREP analysis. Guidance for resolving the problems encountered in previous analyses is offered. Numerous examples and representative products from previous analyses clarify the discussion

  14. Evaluation of Hose in Hose Transfer Line Service Life for Hanford's Interim Stabilization Program

    International Nuclear Information System (INIS)

    TORRES, T.D.

    2000-01-01

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program, defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program, has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning. Prudent engineering dictates that the equipment placed in service have a working life in excess of this forecasted time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer and published literature. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are process fluid characteristics, ambient environmental conditions, and the manufacturer's stated shelf life. This evaluation examines the manufacturer's certification of shelf life, the manufacturer's certifications of chemical compatibility with waste, and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials to evaluate transfer line service life

  15. Federal Employees Health Benefits Program and Federal Employees Dental and Vision Insurance Program: eligibility for Pathway Programs participants. Interim final rule with request for comments.

    Science.gov (United States)

    2014-01-06

    The U.S. Office of Personnel Management (OPM) is issuing an interim final regulation to update the Federal Employees Health Benefits Program (FEHBP) and the Federal Employees Dental and Vision Insurance Program (FEDVIP) regulations to reflect updated election opportunities for participants in the Pathways Programs. The Pathways Programs were created by Executive Order (E.O.) 13562, signed by the President on December 27, 2010, and are designed to enable the Federal Government to compete effectively for students and recent graduates by improving its recruitment efforts through internships and similar programs with Federal agencies. This interim final rule furthers these recruitment and retention efforts by providing health insurance, as well as dental and vision benefits, to eligible program participants and their families.

  16. 76 FR 74834 - Interim Staff Guidance on Aging Management Program for Steam Generators

    Science.gov (United States)

    2011-12-01

    ... for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION: Interim staff guidance; issuance... (LR-ISG), LR-ISG-2011-02, ``Aging Management Program for Steam Generators.'' This LR-ISG provides the...) document, NEI 97-06, ``Steam Generator Program Guidelines,'' (NRC's Agencywide Documents Access and...

  17. Determining on-fault earthquake magnitude distributions from integer programming

    Science.gov (United States)

    Geist, Eric L.; Parsons, Thomas E.

    2018-01-01

    Earthquake magnitude distributions among faults within a fault system are determined from regional seismicity and fault slip rates using binary integer programming. A synthetic earthquake catalog (i.e., list of randomly sampled magnitudes) that spans millennia is first formed, assuming that regional seismicity follows a Gutenberg-Richter relation. Each earthquake in the synthetic catalog can occur on any fault and at any location. The objective is to minimize misfits in the target slip rate for each fault, where slip for each earthquake is scaled from its magnitude. The decision vector consists of binary variables indicating which locations are optimal among all possibilities. Uncertainty estimates in fault slip rates provide explicit upper and lower bounding constraints to the problem. An implicit constraint is that an earthquake can only be located on a fault if it is long enough to contain that earthquake. A general mixed-integer programming solver, consisting of a number of different algorithms, is used to determine the optimal decision vector. A case study is presented for the State of California, where a 4 kyr synthetic earthquake catalog is created and faults with slip ≥3 mm/yr are considered, resulting in >106  variables. The optimal magnitude distributions for each of the faults in the system span a rich diversity of shapes, ranging from characteristic to power-law distributions. 

  18. Evaluation of Hose in Hose Transfer Line Service Life for Hanford's Interim Stabilization Program

    Energy Technology Data Exchange (ETDEWEB)

    TORRES, T.D.

    2000-08-24

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program, defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program, has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning. Prudent engineering dictates that the equipment placed in service have a working life in excess of this forecasted time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer and published literature. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are process fluid characteristics, ambient environmental conditions, and the manufacturer's stated shelf life. This evaluation examines the manufacturer's certification of shelf life, the manufacturer's certifications of chemical compatibility with waste, and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials to evaluate transfer line service life.

  19. Evaluation of Hose in Hose Transfer Line Service Life for Hanfords Interim Stabilization Program

    International Nuclear Information System (INIS)

    TORRES, T.D.

    2001-01-01

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program (Torres, 2000a), defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of waste transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program (Torres, 2000b), has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications associated with Interim Stabilization. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning, RPP-6028 Section 3.2.7. Performance Incentive Number ORP-05 requires that all the Single Shell Tanks be Interim Stabilized by September 30, 2003. The Tri-Party Agreement (TPA) milestone M-41-00, enforced by a federal consent decree, requires all the Single Shell Tanks to be Interim stabilized by September 30, 2004. By meeting the Performance Incentive the TPA milestone is met. Prudent engineering dictates that the equipment used to transfer waste have a life in excess of the forecasted operational time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer, published literature and calculations. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are the hose material's resistance to the harmful effects of process fluid characteristics, ambient environmental conditions, exposure to ionizing radiation and the

  20. 13 CFR 120.890 - Source of interim financing.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Source of interim financing. 120... Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may use interim financing for all Project costs except the Borrower's contribution. Any source (including...

  1. Algorithms and programs for consequence diagram and fault tree construction

    International Nuclear Information System (INIS)

    Hollo, E.; Taylor, J.R.

    1976-12-01

    A presentation of algorithms and programs for consequence diagram and sequential fault tree construction that are intended for reliability and disturbance analysis of large systems. The system to be analyzed must be given as a block diagram formed by mini fault trees of individual system components. The programs were written in LISP programming language and run on a PDP8 computer with 8k words of storage. A description is given of the methods used and of the program construction and working. (author)

  2. Seismic Safety Margins Research Program. Phase I. Interim definition of terms

    International Nuclear Information System (INIS)

    Smith, P.D.; Dong, R.G.

    1980-01-01

    This report documents interim definitions of terms in the Seismic Safety Margins Research Program (SSMRP). Intent is to establish a common-based terminology integral to the probabilistic methods that predict more realistically the behavior of nuclear power plants during an earthquake. These definitions are a response to a request by the Nuclear Regulatory Commission Advisory Committee on Reactor Safeguards at its meeting held November 15-16, 1979

  3. Object-oriented fault tree evaluation program for quantitative analyses

    Science.gov (United States)

    Patterson-Hine, F. A.; Koen, B. V.

    1988-01-01

    Object-oriented programming can be combined with fault free techniques to give a significantly improved environment for evaluating the safety and reliability of large complex systems for space missions. Deep knowledge about system components and interactions, available from reliability studies and other sources, can be described using objects that make up a knowledge base. This knowledge base can be interrogated throughout the design process, during system testing, and during operation, and can be easily modified to reflect design changes in order to maintain a consistent information source. An object-oriented environment for reliability assessment has been developed on a Texas Instrument (TI) Explorer LISP workstation. The program, which directly evaluates system fault trees, utilizes the object-oriented extension to LISP called Flavors that is available on the Explorer. The object representation of a fault tree facilitates the storage and retrieval of information associated with each event in the tree, including tree structural information and intermediate results obtained during the tree reduction process. Reliability data associated with each basic event are stored in the fault tree objects. The object-oriented environment on the Explorer also includes a graphical tree editor which was modified to display and edit the fault trees.

  4. Slicken 1.0: Program for calculating the orientation of shear on reactivated faults

    Science.gov (United States)

    Xu, Hong; Xu, Shunshan; Nieto-Samaniego, Ángel F.; Alaniz-Álvarez, Susana A.

    2017-07-01

    The slip vector on a fault is an important parameter in the study of the movement history of a fault and its faulting mechanism. Although there exist many graphical programs to represent the shear stress (or slickenline) orientations on faults, programs to quantitatively calculate the orientation of fault slip based on a given stress field are scarce. In consequence, we develop Slicken 1.0, a software to rapidly calculate the orientation of maximum shear stress on any fault plane. For this direct method of calculating the resolved shear stress on a planar surface, the input data are the unit vector normal to the involved plane, the unit vectors of the three principal stress axes, and the stress ratio. The advantage of this program is that the vertical or horizontal principal stresses are not necessarily required. Due to its nimble design using Java SE 8.0, it runs on most operating systems with the corresponding Java VM. The software program will be practical for geoscience students, geologists and engineers and will help resolve a deficiency in field geology, and structural and engineering geology.

  5. Lamar Low-Level Jet Program Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Kelley, N.; Shirazi, M.; Jager, D.; Wilde, S.; Adams, J.; Buhl, M.; Sullivan, P.; Patton, E.

    2004-01-01

    This interim report presents the results to date from the Lamar Low-Level Jet Program (LLLJP) that has been established as joint effort among the U.S. Department of Energy (DOE), the National Wind Technology Center (NWTC) of the National Renewable Energy Laboratory (NREL), and General Electric Wind Energy (GE Wind). The purpose of this project is to develop an understanding of the influence of nocturnal low-level jet streams on the inflow turbulence environment and the documenting of any potential operating impacts on current large wind turbines and the Low Wind Speed Turbine (LWST) designs of the future. A year's record of detailed nocturnal turbulence measurements has been collected from NREL instrumentation installed on the GE Wind 120-m tower in southeastern Colorado and supplemented with mean wind profile data collected using an acoustic wind profiler or SODAR (Sound Detection and Ranging). The analyses of measurements taken as part of a previous program conducted at the NWTC have been used to aid in the interpretation of the results of representative case studies of data collected from the GE Wind tower.

  6. Fenix, A Fault Tolerant Programming Framework for MPI Applications

    Energy Technology Data Exchange (ETDEWEB)

    2016-10-05

    Fenix provides APIs to allow the users to add fault tolerance capability to MPI-based parallel programs in a transparent manner. Fenix-enabled programs can run through process failures during program execution using a pool of spare processes accommodated by Fenix.

  7. Savannah River Interim Waste Management Program Plan - FY 1986

    International Nuclear Information System (INIS)

    1985-09-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1986. In addition, the document projects activities for several years beyond 1986 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of May 1985

  8. Savannah River Interim Waste Management Program plan, FY-1987

    International Nuclear Information System (INIS)

    1986-09-01

    This document provides the program plan as requested by the Savannah River Operations office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1987. In addition, the document projects activities for several years beyond 1987 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of June 1986

  9. Sample results from the interim salt disposition program macrobatch 9 tank 21H qualification samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-11-01

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 9 for the Interim Salt Disposition Program (ISDP). This document reports characterization data on the samples of Tank 21H.

  10. MAPLE-II. A program for plotting fault trees

    International Nuclear Information System (INIS)

    Poucet, A.; Van Den Muyzenberg, C.L.

    1987-01-01

    The MAPLE II code is an improved version of the MAPLE program for plotting fault trees. MAPLE II has added features which make it a versatile tool for drawing large and complex logic trees. The code is developed as part of a package for computer aided fault tree construction and analysis in which it is integrated and used as a documentation tool. However the MAPLE II code can be used as a separate program which uses as input a structure function of a tree and a description of the events and gates which make up the tree. This report includes a short description of the code and of its features. Moreover it contains the how-to-use and some indications for implementing the code and for adapting it to different graphics systems

  11. Results from the Interim Salt Disposition Program Macrobatch 11 Tank 21H Acceptance Samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Bannochie, C. J. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-11-13

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of verification of Macrobatch (Salt Batch) 11 for the Interim Salt Disposition Program (ISDP) for processing. This document reports characterization data on the samples of Tank 21H and fulfills the requirements of Deliverable 3 of the Technical Task Request (TTR).

  12. Analysis of removal of residual decay heat from interim storage facilities by means of the CFD program FLUENT

    International Nuclear Information System (INIS)

    Stratmann, W.; Hages, P.

    2004-01-01

    Within the scope of nuclear licensing procedures of on-site interim storage facilities for dual purpose casks it is necessary, among other things, to provide proof of sufficient removal of the residual decay heat emitted by the casks. The results of the analyses performed for this purpose define e.g. the boundary conditions for further thermal analyses regarding the permissible cask component temperatures or the maximum permissible temperatures of the fuel cladding tubes of the fuel elements stored in the casks. Up to now, for the centralized interim storage facilities in Germany such analyses were performed on the basis of experimental investigations using scaled-down storage geometries. In the engineering phase of the Lingen on-site interim storage facility, proof was furnished for the first time using the CFD (computational fluid dynamics) program FLUENT. The program FLUENT is an internationally recognized and comprehensively verified program for the calculation of flow and heat transport processes. Starting from a brief discussion of modeling and the different boundary conditions of the computation, this contribution presents various results regarding the temperatures of air, cask surfaces and storage facility components, the mass flows through the storage facility and the heat transfer at the cask surface. The interface point to the cask-specific analyses is defined to be the cask surface

  13. MFAULT: a computer program for analyzing fault trees

    International Nuclear Information System (INIS)

    Pelto, P.J.; Purcell, W.L.

    1977-11-01

    A description and user instructions are presented for MFAULT, a FORTRAN computer program for fault tree analysis. MFAULT identifies the cut sets of a fault tree, calculates their probabilities, and screens the cut sets on the basis of specified cut-offs on probability and/or cut set length. MFAULT is based on an efficient upward-working algorithm for cut set identification. The probability calculations are based on the assumption of small probabilities and constant hazard rates (i.e., exponential failure distributions). Cut sets consisting of repairable components (basic events) only, non-repairable components only, or mixtures of both types can be evaluated. Components can be on-line or standby. Unavailability contributions from pre-existing failures, failures on demand, and testing and maintenance down-time can be handled. MFAULT can analyze fault trees with AND gates, OR gates, inhibit gates, on switches (houses) and off switches. The code is presently capable of finding up to ten event cut sets from a fault tree with up to 512 basic events and 400 gates. It is operational on the CONTROL DATA CYBER 74 computer. 11 figures

  14. Long Term Inactive Well Program requirements : interim directive ID 97-08

    International Nuclear Information System (INIS)

    1997-01-01

    The Alberta Energy and Utilities Board and the petroleum industry have agreed that industry must take proactive measures to reduce the number of long term inactive wells in Alberta. This interim directive outlines the requirements of the Long Term Inactive Well Program, and provides a schedule for industry to reduce the number of inactive wells. EUB estimates that there are currently 35,000 inactive wells in Alberta, 10,000 of which have been inactive for more than 10 consecutive years. These wells pose a financial risk to the Abandonment Fund which was established to help fund the abandonment of orphan wells. The Long Term Inactive Well Program was created based on the recommendations of a joint government/industry committee, and will operate for five years. 5 tabs

  15. 76 FR 60937 - Draft License Renewal Interim Staff Guidance LR-ISG-2011-02; Aging Management Program for Steam...

    Science.gov (United States)

    2011-09-30

    ...-2011-02; Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION... License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-02, ``Aging Management Program for Steam... using Revision 3 of NEI 97-06 to manage steam generator aging. The Draft LR-ISG revises the NRC staff's...

  16. Savannah River interim waste management program plan: FY 1984. Revision 1

    International Nuclear Information System (INIS)

    1983-10-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1984. In addition, the document projects activities for several years beyond 1984 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of June 1983

  17. Online Monitoring Technical Basis and Analysis Framework for Large Power Transformers; Interim Report for FY 2012

    Energy Technology Data Exchange (ETDEWEB)

    Nancy J. Lybeck; Vivek Agarwal; Binh T. Pham; Heather D. Medema; Kirk Fitzgerald

    2012-09-01

    The Light Water Reactor Sustainability program at Idaho National Laboratory (INL) is actively conducting research to develop and demonstrate online monitoring (OLM) capabilities for active components in existing Nuclear Power Plants. A pilot project is currently underway to apply OLM to Generator Step-Up Transformers (GSUs) and Emergency Diesel Generators (EDGs). INL and the Electric Power Research Institute (EPRI) are working jointly to implement the pilot project. The EPRI Fleet-Wide Prognostic and Health Management (FW-PHM) Software Suite will be used to implement monitoring in conjunction with utility partners: the Shearon Harris Nuclear Generating Station (owned by Duke Energy for GSUs, and Braidwood Generating Station (owned by Exelon Corporation) for EDGs. This report presents monitoring techniques, fault signatures, and diagnostic and prognostic models for GSUs. GSUs are main transformers that are directly connected to generators, stepping up the voltage from the generator output voltage to the highest transmission voltages for supplying electricity to the transmission grid. Technical experts from Shearon Harris are assisting INL and EPRI in identifying critical faults and defining fault signatures associated with each fault. The resulting diagnostic models will be implemented in the FW-PHM Software Suite and tested using data from Shearon-Harris. Parallel research on EDGs is being conducted, and will be reported in an interim report during the first quarter of fiscal year 2013.

  18. FTAP, Minimal Cut Sets of Arbitrary Fault Trees. FRTPLT, Fault Tree Structure and Logical Gates Plot for Program FTAP. FRTGEN, Fault Trees by Sub-tree Generator from Parent Tree for Program FTAP

    International Nuclear Information System (INIS)

    Willie, Randall R.; Rabien, U.

    1997-01-01

    1 - Description of problem or function: FTAP is a general-purpose program for deriving minimal reliability cut and path set families from the fault tree for a complex system. The program has a number of useful features that make it well-suited to nearly all fault tree applications. An input fault tree may specify the system state as any logical function of subsystem or component state variables or complements of these variables; thus, for instance, 'exclusive-or' type relations may be formed. When fault tree logical relations involve complements of state variables, the analyst may instruct FTAP to produce a family of prime implicants, a generalization of the minimal cut set concept. The program offers the flexibility of several distinct methods of generating cut set families. FTAP can also identify certain subsystems as system modules and provide a collection of minimal cut set families that essentially expresses the system state as a function of these module state variables. Another feature allows a useful subfamily to be obtained when the family of minimal cut sets or prime implicants is too large to be found in its entirety; this subfamily may consist of only those sets not containing more than some fixed number of elements or only those sets 'interesting' to the analyst in some special sense. Finally, the analyst can modify the input fault tree in various ways by declaring state variables identically true or false. 2 - Method of solution: Fault tree methods are based on the observation that the system state, either working or failed, can usually be expressed as a Boolean relation between states of several large, readily identifiable subsystems. The state of each subsystem in turn depends on states of simpler subsystems and components which compose it, so that the state of the system itself is determined by a hierarchy of logical relationships between states of subsystems. A fault tree is a graphical representation of these relationships. 3 - Restrictions on the

  19. Tribal child welfare. Interim final rule.

    Science.gov (United States)

    2012-01-06

    The Administration for Children and Families (ACF) is issuing this interim final rule to implement statutory provisions related to the Tribal title IV-E program. Effective October 1, 2009, section 479B(b) of the Social Security Act (the Act) authorizes direct Federal funding of Indian Tribes, Tribal organizations, and Tribal consortia that choose to operate a foster care, adoption assistance and, at Tribal option, a kinship guardianship assistance program under title IV-E of the Act. The Fostering Connections to Success and Increasing Adoptions Act of 2008 requires that ACF issue interim final regulations which address procedures to ensure that a transfer of responsibility for the placement and care of a child under a State title IV-E plan to a Tribal title IV-E plan occurs in a manner that does not affect the child's eligibility for title IV-E benefits or medical assistance under title XIX of the Act (Medicaid) and such services or payments; in-kind expenditures from third-party sources for the Tribal share of administration and training expenditures under title IV-E; and other provisions to carry out the Tribal-related amendments to title IV-E. This interim final rule includes these provisions and technical amendments necessary to implement a Tribal title IV-E program.

  20. Physical protection of shipments of irradiated reactor fuel; Interim guidance. Regulatory report

    International Nuclear Information System (INIS)

    1980-06-01

    During May, 1979, the U.S. Nuclear Regulatory Commission approved for issuance in effective form new interim regulations for strengthening the protection of spent fuel shipments against sabotage and diversion. The new regulations were issued without benefit of public comment, but comments from the public were solicited after the effective date. Based upon the public comments received, the interim regulations were amended and reissued in effective form as a final interim rule in May, 1980. The present document supersedes a previously issued interim guidance document, NUREG-0561 (June, 1979) which accompanied the original rule. This report has been revised to conform to the new interim regulations on the physical protection of shipments of irradiated reactor fuel which are likely to remain in effect until the completion of an ongoing research program concerning the response of spent fuel to certain forms of sabotage, at which time the regulations may be rescinded, modified or made permanent, as appropriate. This report discusses the amended regulations and provides a basis on which licensees can develop an acceptable interim program for the protection of spent fuel shipments

  1. Reliability database development for use with an object-oriented fault tree evaluation program

    Science.gov (United States)

    Heger, A. Sharif; Harringtton, Robert J.; Koen, Billy V.; Patterson-Hine, F. Ann

    1989-01-01

    A description is given of the development of a fault-tree analysis method using object-oriented programming. In addition, the authors discuss the programs that have been developed or are under development to connect a fault-tree analysis routine to a reliability database. To assess the performance of the routines, a relational database simulating one of the nuclear power industry databases has been constructed. For a realistic assessment of the results of this project, the use of one of existing nuclear power reliability databases is planned.

  2. Interim restorations.

    Science.gov (United States)

    Gratton, David G; Aquilino, Steven A

    2004-04-01

    Interim restorations are a critical component of fixed prosthodontic treatment, biologically and biomechanically. Interim restoration serves an important diagnostic role as a functional and esthetic try-in and as a blueprint for the design of the definitive prosthesis. When selecting materials for any interim restoration, clinicians must consider physical properties, handling properties, patient acceptance, and material cost. Although no single material meets all the requirements and material classification alone of a given product is not a predictor of clinical performance, bis-acryl materials are typically best suited to single-unit restorations, and poly(methylmethacrylate) interim materials are generally ideal for multi-unit, complex, long-term, interim fixed prostheses. As with most dental procedures, the technique used for fabrication has a greater effect on the final result than the specific material chosen.

  3. Information management architecture for an integrated computing environment for the Environmental Restoration Program. Environmental Restoration Program, Volume 3, Interim technical architecture

    International Nuclear Information System (INIS)

    1994-09-01

    This third volume of the Information Management Architecture for an Integrated Computing Environment for the Environmental Restoration Program--the Interim Technical Architecture (TA) (referred to throughout the remainder of this document as the ER TA)--represents a key milestone in establishing a coordinated information management environment in which information initiatives can be pursued with the confidence that redundancy and inconsistencies will be held to a minimum. This architecture is intended to be used as a reference by anyone whose responsibilities include the acquisition or development of information technology for use by the ER Program. The interim ER TA provides technical guidance at three levels. At the highest level, the technical architecture provides an overall computing philosophy or direction. At this level, the guidance does not address specific technologies or products but addresses more general concepts, such as the use of open systems, modular architectures, graphical user interfaces, and architecture-based development. At the next level, the technical architecture provides specific information technology recommendations regarding a wide variety of specific technologies. These technologies include computing hardware, operating systems, communications software, database management software, application development software, and personal productivity software, among others. These recommendations range from the adoption of specific industry or Martin Marietta Energy Systems, Inc. (Energy Systems) standards to the specification of individual products. At the third level, the architecture provides guidance regarding implementation strategies for the recommended technologies that can be applied to individual projects and to the ER Program as a whole

  4. The use of automatic programming techniques for fault tolerant computing systems

    Science.gov (United States)

    Wild, C.

    1985-01-01

    It is conjectured that the production of software for ultra-reliable computing systems such as required by Space Station, aircraft, nuclear power plants and the like will require a high degree of automation as well as fault tolerance. In this paper, the relationship between automatic programming techniques and fault tolerant computing systems is explored. Initial efforts in the automatic synthesis of code from assertions to be used for error detection as well as the automatic generation of assertions and test cases from abstract data type specifications is outlined. Speculation on the ability to generate truly diverse designs capable of recovery from errors by exploring alternate paths in the program synthesis tree is discussed. Some initial thoughts on the use of knowledge based systems for the global detection of abnormal behavior using expectations and the goal-directed reconfiguration of resources to meet critical mission objectives are given. One of the sources of information for these systems would be the knowledge captured during the automatic programming process.

  5. ITER Conceptual design: Interim report

    International Nuclear Information System (INIS)

    1990-01-01

    This interim report describes the results of the International Thermonuclear Experimental Reactor (ITER) Conceptual Design Activities after the first year of design following the selection of the ITER concept in the autumn of 1988. Using the concept definition as the basis for conceptual design, the Design Phase has been underway since October 1988, and will be completed at the end of 1990, at which time a final report will be issued. This interim report includes an executive summary of ITER activities, a description of the ITER device and facility, an operation and research program summary, and a description of the physics and engineering design bases. Included are preliminary cost estimates and schedule for completion of the project

  6. Automotive Mechanics Occupational Performance Survey. Interim Report.

    Science.gov (United States)

    Borcher, Sidney D.; Leiter, Paul B.

    The purpose of this federally-funded interim report is to present the results of a task inventory analysis survey of automotive mechanics completed by project staff within the Instructional Systems Design Program at the Center for Vocational and Technical Education. Intended for use in curriculum development for vocational education programs in…

  7. Fault Tolerance Assistant (FTA): An Exception Handling Programming Model for MPI Applications

    Energy Technology Data Exchange (ETDEWEB)

    Fang, Aiman [Univ. of Chicago, IL (United States). Dept. of Computer Science; Laguna, Ignacio [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Sato, Kento [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Islam, Tanzima [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Mohror, Kathryn [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-05-23

    Future high-performance computing systems may face frequent failures with their rapid increase in scale and complexity. Resilience to faults has become a major challenge for large-scale applications running on supercomputers, which demands fault tolerance support for prevalent MPI applications. Among failure scenarios, process failures are one of the most severe issues as they usually lead to termination of applications. However, the widely used MPI implementations do not provide mechanisms for fault tolerance. We propose FTA-MPI (Fault Tolerance Assistant MPI), a programming model that provides support for failure detection, failure notification and recovery. Specifically, FTA-MPI exploits a try/catch model that enables failure localization and transparent recovery of process failures in MPI applications. We demonstrate FTA-MPI with synthetic applications and a molecular dynamics code CoMD, and show that FTA-MPI provides high programmability for users and enables convenient and flexible recovery of process failures.

  8. Diesel Emission Control -- Sulfur Effects (DECSE) Program; Phase I Interim Data Report No. 1

    Energy Technology Data Exchange (ETDEWEB)

    DOE; ORNL; NREL; EMA; MECA

    1999-08-15

    The Diesel Emission Control-Sulfur Effects (DECSE) is a joint government/industry program to determine the impact of diesel fuel sulfur levels on emission control systems whose use could lower emissions of nitrogen oxides (NO{sub x}) and particulate matter (PM) from on-highway trucks in the 2002--2004 model years. Phase 1 of the program was developed with the following objectives in mind: (1) evaluate the effects of varying the level of sulfur content in the fuel on the emission reduction performance of four emission control technologies; and (2) measure and compare the effects of up to 250 hours of aging on selected devices for multiple levels of fuel sulfur content. This interim data report summarizes results as of August, 1999, on the status of the test programs being conducted on three technologies: lean-NO{sub x} catalysts, diesel particulate filters and diesel oxidation catalysts.

  9. Computer aided construction of fault tree

    International Nuclear Information System (INIS)

    Kovacs, Z.

    1982-01-01

    Computer code CAT for the automatic construction of the fault tree is briefly described. Code CAT makes possible simple modelling of components using decision tables, it accelerates the fault tree construction process, constructs fault trees of different complexity, and is capable of harmonized co-operation with programs PREPandKITT 1,2 for fault tree analysis. The efficiency of program CAT and thus the accuracy and completeness of fault trees constructed significantly depends on the compilation and sophistication of decision tables. Currently, program CAT is used in co-operation with programs PREPandKITT 1,2 in reliability analyses of nuclear power plant systems. (B.S.)

  10. Investigation of the applicability of a functional programming model to fault-tolerant parallel processing for knowledge-based systems

    Science.gov (United States)

    Harper, Richard

    1989-01-01

    In a fault-tolerant parallel computer, a functional programming model can facilitate distributed checkpointing, error recovery, load balancing, and graceful degradation. Such a model has been implemented on the Draper Fault-Tolerant Parallel Processor (FTPP). When used in conjunction with the FTPP's fault detection and masking capabilities, this implementation results in a graceful degradation of system performance after faults. Three graceful degradation algorithms have been implemented and are presented. A user interface has been implemented which requires minimal cognitive overhead by the application programmer, masking such complexities as the system's redundancy, distributed nature, variable complement of processing resources, load balancing, fault occurrence and recovery. This user interface is described and its use demonstrated. The applicability of the functional programming style to the Activation Framework, a paradigm for intelligent systems, is then briefly described.

  11. Immobilized high-level waste interim storage alternatives generation and analysis and decision report

    International Nuclear Information System (INIS)

    CALMUS, R.B.

    1999-01-01

    This report presents a study of alternative system architectures to provide onsite interim storage for the immobilized high-level waste produced by the Tank Waste Remediation System (TWRS) privatization vendor. It examines the contract and program changes that have occurred and evaluates their impacts on the baseline immobilized high-level waste (IHLW) interim storage strategy. In addition, this report documents the recommended initial interim storage architecture and implementation path forward

  12. A randomized controlled trial of interim methadone maintenance.

    Science.gov (United States)

    Schwartz, Robert P; Highfield, David A; Jaffe, Jerome H; Brady, Joseph V; Butler, Carol B; Rouse, Charles O; Callaman, Jason M; O'Grady, Kevin E; Battjes, Robert J

    2006-01-01

    Effective alternatives to long waiting lists for entry into methadone hydrochloride maintenance treatment are needed to reduce the complications of continuing heroin dependence and to increase methadone treatment entry. To compare the effectiveness of interim methadone maintenance with that of the usual waiting list condition in facilitating methadone treatment entry and reducing heroin and cocaine use and criminal behavior. Randomized, controlled, clinical trial using 2 conditions, with treatment assignment on a 3:2 basis to interim maintenance-waiting list control. A methadone treatment program in Baltimore. A total of 319 individuals meeting the criteria for current heroin dependence and methadone maintenance treatment. Participants were randomly assigned to either interim methadone maintenance, consisting of an individually determined methadone dose and emergency counseling only for up to 120 days, or referral to community-based methadone treatment programs. Entry into comprehensive methadone maintenance therapy at 4 months from baseline; self-reported days of heroin use, cocaine use, and criminal behavior; and number of urine drug test results positive for heroin and cocaine at the follow-up interview conducted at time of entry into comprehensive methadone treatment (or at 4 months from baseline for participants who did not enter regular treatment). Significantly more participants assigned to the interim methadone maintenance condition entered comprehensive methadone maintenance treatment by the 120th day from baseline (75.9%) than those assigned to the waiting list control condition (20.8%) (Pmethadone maintenance results in a substantial increase in the likelihood of entry into comprehensive treatment, and is an effective means of reducing heroin use and criminal behavior among opioid-dependent individuals awaiting entry into a comprehensive methadone treatment program.

  13. The NASA cosmic ray program for the 1990's and beyond Interim report of the NASA Cosmic Ray Program Working Group

    International Nuclear Information System (INIS)

    Ahlen, S.P.; Binns, W.R.; Cherry, M.L.; Gaisser, T.K.; Jones, W.V.; Ling, J.C.; Mewaldt, R.A.; Muller, D.; Ormes, J.O.; Ramaty, R.; Stone, E.C.; Waddington, C.J.; Webber, W.R.; Miedenbeck, M.E.

    1990-01-01

    The interim report of the 1989 NASA Cosmic Ray Program Working Group is presented. The report summarizes the cosmic ray program for the 1990's, including the recently approved ACE, Astromag, HNC, POEMS, and SAMPEX missions, as well as other key elements of the program. New science themes and candidate missions are identified for the first part of the 21st Century, including objectives that might be addressed as part of the Human Exploration Initiative. Among the suggested new thrusts for the 21st century are: an Interstellar Probe into the nearby interstellar medium; a Lunar-Based Calorimeter to measure the cosmic ray composition near ∼10 16 eV; high precision element and isotope spectroscopy of ultraheavy (Z≥30) elements; and new, more sensitive, studies of impulsive solar flare events

  14. Interim format and content for a physical security plan for nuclear power plants

    International Nuclear Information System (INIS)

    1977-02-01

    The document serves as interim guidance to assist the licensee or applicant in the preparation of a physical security plan. It is to be used in conjunction with interim acceptance criteria for physical security programs, which will be distributed at a later date

  15. Industrial complementarities between interim storage and reversible geological repository - 59237

    International Nuclear Information System (INIS)

    Hoorelbeke, Jean-Michel

    2012-01-01

    2006 French Act provides for a research program on interim storage to be carried out along with the repository project development. This program has been guided by the complementarities between interim storage and the repository project. The main research issues address the longevity of storage facilities, up to 100 years, their versatility with regard to waste package types and their modularity to match future needs progressively. In parallel the dialogue between Andra and waste producers will continue to propose optimized waste management scenarios. (author)

  16. DEVELOPMENT OF THERAPEUTIC STRATEGIES FOR OBESITY AND COMORBID DISORDERS BASED ON OBSERVATIONAL PROGRAMS: INTERIM RESULTS OF THE RUSSIAN OBSERVATIONAL PROGRAM PRIMAVERA

    Directory of Open Access Journals (Sweden)

    E. A. Troshina

    2015-01-01

    Full Text Available Aim: To assess interim results of the Russian observational program PrimaVera on efficacy and safety sibutramine (Reduxin® for treatment of obesity within routine medical practice. Materials and methods: This multicenter observational program included patients with obesity aged below 65  years, excluding those with uncontrolled arterial hypertension, coronary heart disease, heart failure and cerebrovascular disease. All patients were administered sibutramine for treatment of their obesity. During out-patient follow-up visits, physicians assessed changes in patients’ body mass, blood pressure and heart rate, as well as registered adverse events. Maximal treatment duration was 12 months. In this report, the results from 16  515  patients are analyzed, 82% of whom (n=13 192 were females.Results: After 3  months of treatment body mass index (BMI decreased by 2.81±1.0  kg/m², after 6 months, by 5.17±2.15 kg/m². At 12 months decrease in BMI was 1.3-fold higher compared to 6  months’ results and amounted to 6.76±2.93  kg/m². Reduction of body mass with longterm (above 6  months treatment with sibutramine under supervision of a physician was associated with a decrease in systolic and diastolic blood pressure levels (by 4.1 mm Hg, in both cases and did not lead to an increase in heart rate (Δ=-1.02  bpm. Based on data from 16  515  medical records processed up to now, 397  episodes of adverse events were registered, with none of them being serious.Conclusion: This interim results of the program PrimaVera confirmed favorable safety profile of Reduxin® and its high efficacy in the treatment of obesity.

  17. Results from the interim salt disposition program macrobatch 10 tank 21H qualification samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Bannochie, C. J. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-02-23

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 10 for the Interim Salt Disposition Program (ISDP). This document reports characterization data on the samples of Tank 21H and fulfills the requirements of Deliverable 3 of the Technical Task Request (TTR). Further work will report the results of the Extraction-Scrub-Strip (ESS) testing (Task 5 of the TTR) using the Tank 21H material. Task 4 of the TTR (MST Strike) will not be completed for Salt Batch 10.

  18. Algorithms and programs for evaluating fault trees with multi-state components

    International Nuclear Information System (INIS)

    Wickenhaeuser, A.

    1989-07-01

    Part 1 and 2 of the report contain a summary overview of methods and algorithms for the solution of fault tree analysis problems. The following points are treated in detail: Treatment of fault tree components with more than two states. Acceleration of the solution algorithms. Decomposition and modularization of extensive systems. Calculation of the structural function and the exact occurrence probability. Treatment of statistical dependencies. A flexible tool to be employed in solving these problems is the method of forming Boolean variables with restrictions. In this way, components with more than two states can be treated, the possibilities of forming modules expanded, and statistical dependencies treated. Part 3 contains descriptions of the MUSTAFA, MUSTAMO, PASPI, and SIMUST computer programs based on these methods. (orig./HP) [de

  19. Single-shell tank interim stabilization project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.E.

    1998-05-11

    This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  20. Single-shell tank interim stabilization project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.E.

    1998-03-27

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE`s Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  1. Single-shell tank interim stabilization project plan

    International Nuclear Information System (INIS)

    Ross, W.E.

    1998-01-01

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE's Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  2. Insights from the interim reliability evaluation program pertinent to reactor safety issues

    International Nuclear Information System (INIS)

    Carlson, D.D.

    1983-01-01

    The Interim Reliability Evaluation Program (IREP) consisted of concurrent probabilistic analyses of four operating nuclear power plants. This paper presents and integrated view of the results of the analyses drawing insights pertinent to reactor safety. The importance to risk of accident sequences initiated by transients and small loss-of-coolant accidents was confirmed. Support systems were found to contribute significantly to the sets of dominant accident sequences, either due to single failures which could disable one or more mitigating systems or due to their initiating plant transients. Human errors in response to accidents also were important risk contributors. Consideration of operator recovery actions influences accident sequence frequency estimates, the list of accident sequences dominating core melt, and the set of dominant risk contributors. Accidents involving station blackout, reactor coolant pump seal leaks and ruptures, and loss-of-coolant accidents requiring manual initiation of coolant injection were found to be risk significant

  3. Automatic Supervision And Fault Detection In PV System By Wireless Sensors With Interfacing By Labview Program

    Directory of Open Access Journals (Sweden)

    Yousra M Abbas

    2015-08-01

    Full Text Available In this work a wireless monitoring system are designed for automatic detection localization fault in photovoltaic system. In order to avoid the use of modeling and simulation of the PV system we detected the fault by monitoring the output of each individual photovoltaic panel connected in the system by Arduino and transmit this data wirelessly to laptop then interface it by LabVIEW program which made comparison between this data and the measured data taking from reference module at the same condition. The proposed method is very simple but effective detecting and diagnosing the main faults of a PV system and was experimentally validated and has demonstrated its effectiveness in the detection and diagnosing of main faults present in the DC side of PV system.

  4. Indiana application for interim authorization, phase I, hazardous waste management program--Environmental Protection Agency. Notice of public hearing and public comment period.

    Science.gov (United States)

    1982-04-12

    EPA regulations to protect human health and the environment from the improper management of hazardous waste were published in the Federal Register on May 19, 1980 (45 FR 33063). These regulations include provisions for authorization of State programs to operate in lieu of the Federal program. Today EPA is announcing the availability for public review of the Indiana application for Phase I Interim Authorization, inviting public comment, and giving notice of a public hearing to be held on the application.

  5. Interim overdentures.

    Science.gov (United States)

    Fenton, A H

    1976-07-01

    The construction of an interim overdenture using existing removable partial dentures with natural tooth crowns and artificial teeth can be a simple and economical method of providing patients with dentures while tissues heal and teeth are prepared and restored. A more definite prognosis for both the patient and his remaining dentition can be established before the final overdenture is completed. The procedures necessary to provide three types of interim overdentures have been outlined. Patients tolerate this method of changing their dentitions extremely well.

  6. Radioactive waste interim storage in Germany

    International Nuclear Information System (INIS)

    2015-12-01

    The short summary on the radioactive waste interim storage in Germany covers the following issues: importance of interim storage in the frame of radioactive waste management, responsibilities and regulations, waste forms, storage containers, transport of vitrified high-level radioactive wastes from the reprocessing plants, central interim storage facilities (Gorleben, Ahaus, Nord/Lubmin), local interim storage facilities at nuclear power plant sites, federal state collecting facilities, safety, radiation exposure in Germany.

  7. Single-Shell Tank (SST) Interim Stabilization Project Plan

    International Nuclear Information System (INIS)

    VLADIMIROFF, D.T.; BOYLES, V.C.

    2000-01-01

    This project plan establishes the management framework for the conduct of the CHG Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organization structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline

  8. Commentary: Interim leadership of academic departments at U.S. medical schools.

    Science.gov (United States)

    Grigsby, R Kevin; Aber, Robert C; Quillen, David A

    2009-10-01

    Medical schools and teaching hospitals are experiencing more frequent turnover of department chairs. Loss of a department chair creates instability in the department and may have a negative effect on the organization at large. Interim leadership of academic departments is common, and interim chairs are expected to immediately demonstrate skills and leadership abilities. However, little is known about how persons are prepared to assume the interim chair role. Newer competencies for effective leadership include an understanding of the business of medicine, interpersonal and communication skills, the ability to deal with conflict and solve adaptive challenges, and the ability to build and work on teams. Medical schools and teaching hospitals need assistance to meet the unique training and support needs of persons serving as interim leaders. For example, the Association of American Medical Colleges and individual chair societies can develop programs to allow current chairs to reflect on their present positions and plan for the future. Formal leadership training, mentorship opportunities, and conscientious succession planning are good first steps in preparing to meet the needs of academic departments during transitions in leadership. Also, interim leadership experience may be useful as a means for "opening the door" to underrepresented persons, including women, and increasing the diversity of the leadership team.

  9. 76 FR 43571 - Small Business HUBZone Program; Government Contracting Programs

    Science.gov (United States)

    2011-07-21

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 126 RIN 3245-AG45 Small Business HUBZone Program; Government Contracting Programs AGENCY: U.S. Small Business Administration. ACTION: Interim final rule with request for comments. SUMMARY: This interim final rule amends the U.S. Small Business Administration's...

  10. The cost and impact of the interim federal health program cuts on child refugees in Canada.

    Science.gov (United States)

    Evans, Andrea; Caudarella, Alexander; Ratnapalan, Savithiri; Chan, Kevin

    2014-01-01

    On June 30, 2012, Interim Federal Health Program (IFHP) funding was cut for refugee claimant healthcare. The potential financial and healthcare impacts of these cuts on refugee claimants are unknown. We conducted a one-year retrospective chart review spanning 6 months before and after IFHP funding cuts at The Hospital for Sick Children, a tertiary care children's hospital in Toronto. We analyzed emergency room visits characteristics, admission rates, reasons for admission, and financial records including billing from Medavie Blue Cross. There were 173 refugee children visits to the emergency room in the six months before and 142 visits in the six months after funding cuts. The total amount billed to the IFHP program during the one-year of this study was $131,615. Prior to the IFHP cuts, 46% of the total emergency room bills were paid by IFHP compared to 7% after the cuts (pinstitution in the country increased.

  11. Computer modelling of superconductive fault current limiters

    Energy Technology Data Exchange (ETDEWEB)

    Weller, R.A.; Campbell, A.M.; Coombs, T.A.; Cardwell, D.A.; Storey, R.J. [Cambridge Univ. (United Kingdom). Interdisciplinary Research Centre in Superconductivity (IRC); Hancox, J. [Rolls Royce, Applied Science Division, Derby (United Kingdom)

    1998-05-01

    Investigations are being carried out on the use of superconductors for fault current limiting applications. A number of computer programs are being developed to predict the behavior of different `resistive` fault current limiter designs under a variety of fault conditions. The programs achieve solution by iterative methods based around real measured data rather than theoretical models in order to achieve accuracy at high current densities. (orig.) 5 refs.

  12. 7 CFR 1738.21 - Interim financing.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1738.21 Section 1738.21... Interim financing. (a) Upon notification by RUS that an applicant's application is considered complete, the applicant may enter into an interim financing agreement with a lender other than RUS or use its...

  13. Improving reliability of state estimation programming and computing suite based on analyzing a fault tree

    Directory of Open Access Journals (Sweden)

    Kolosok Irina

    2017-01-01

    Full Text Available Reliable information on the current state parameters obtained as a result of processing the measurements from systems of the SCADA and WAMS data acquisition and processing through methods of state estimation (SE is a condition that enables to successfully manage an energy power system (EPS. SCADA and WAMS systems themselves, as any technical systems, are subject to failures and faults that lead to distortion and loss of information. The SE procedure enables to find erroneous measurements, therefore, it is a barrier for the distorted information to penetrate into control problems. At the same time, the programming and computing suite (PCS implementing the SE functions may itself provide a wrong decision due to imperfection of the software algorithms and errors. In this study, we propose to use a fault tree to analyze consequences of failures and faults in SCADA and WAMS and in the very SE procedure. Based on the analysis of the obtained measurement information and on the SE results, we determine the state estimation PCS fault tolerance level featuring its reliability.

  14. PC-based support programs coupled with the sets code for large fault tree analysis

    International Nuclear Information System (INIS)

    Hioki, K.; Nakai, R.

    1989-01-01

    Power Reactor and Nuclear Fuel Development Corporation (PNC) has developed four PC programs: IEIQ (Initiating Event Identification and Quantification), MODESTY (Modular Even Description for a Variety of Systems), FAUST (Fault Summary Tables Generation Program) and ETAAS (Event Tree Analysis Assistant System). These programs prepare the input data for the SETS (Set Equation Transformation System) code and construct and quantify event trees (E/Ts) using the output of the SETS code. The capability of these programs is described and some examples of the results are presented in this paper. With these PC programs and the SETS code, PSA can now be performed with more consistency and less manpower

  15. 7 CFR 1735.75 - Interim financing.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1735.75 Section 1735.75... Involving Loan Funds § 1735.75 Interim financing. (a) A borrower may submit a written request for RUS approval of interim financing if it is necessary to close an acquisition before the loan to finance the...

  16. Fault diagnosis

    Science.gov (United States)

    Abbott, Kathy

    1990-01-01

    The objective of the research in this area of fault management is to develop and implement a decision aiding concept for diagnosing faults, especially faults which are difficult for pilots to identify, and to develop methods for presenting the diagnosis information to the flight crew in a timely and comprehensible manner. The requirements for the diagnosis concept were identified by interviewing pilots, analyzing actual incident and accident cases, and examining psychology literature on how humans perform diagnosis. The diagnosis decision aiding concept developed based on those requirements takes abnormal sensor readings as input, as identified by a fault monitor. Based on these abnormal sensor readings, the diagnosis concept identifies the cause or source of the fault and all components affected by the fault. This concept was implemented for diagnosis of aircraft propulsion and hydraulic subsystems in a computer program called Draphys (Diagnostic Reasoning About Physical Systems). Draphys is unique in two important ways. First, it uses models of both functional and physical relationships in the subsystems. Using both models enables the diagnostic reasoning to identify the fault propagation as the faulted system continues to operate, and to diagnose physical damage. Draphys also reasons about behavior of the faulted system over time, to eliminate possibilities as more information becomes available, and to update the system status as more components are affected by the fault. The crew interface research is examining display issues associated with presenting diagnosis information to the flight crew. One study examined issues for presenting system status information. One lesson learned from that study was that pilots found fault situations to be more complex if they involved multiple subsystems. Another was pilots could identify the faulted systems more quickly if the system status was presented in pictorial or text format. Another study is currently under way to

  17. Recent advancements in fault tree methodology at Karlsruhe

    International Nuclear Information System (INIS)

    Caldarola, L.; Wickenhaeuser, A.

    1977-01-01

    A very fast analytical computer program for fault tree evaluation has already been developed at the German nuclear research center of Karlsruhe. This program can evaluate coherent systems assuming binary component states. Four different classes of components can be handled by the program: (1) unrepairable components, (2) repairable components with revealed faults, (3) repairable components with faults remaining unrevealed until next demand occurs and (4) repairable components with faults which are detected upon inspection. The program can perform also time dependent calculations. In particular the program can analyse systems characterized by two phases, one following the other in time (two time axis). A new computer program is also being developed. This computer program will be capable to analyse noncoherent systems with multistate components. The mathematical theory supporting the new program is described in the paper. In particular the algorithm for the identification of the prime implicants and the theory for the calculation of the occurrence probability and of the first occurrence probability of the TOP event are discussed

  18. Public School Finance Problems in Texas. An Interim Report.

    Science.gov (United States)

    Texas Research League, Austin.

    The U.S. District Court ruling in Rodriguez vs San Antonio Independent School District, which struck down Texas' school finance system as inequitable and unconstitutional, provided the impetus for publishing this interim report. The report documents the growing cost of State-supported public school programs--the primary concern prior to the…

  19. Reducing Health Services for Refugees Through Reforms to the Interim Federal Health Program

    Directory of Open Access Journals (Sweden)

    Andrew C. Stevenson

    2018-04-01

    Full Text Available Since 1957 the Interim Federal Health Program (IFHP has provided temporary health care coverage to refugees and refugee claimants, but in 2012 the Conservative government reformed the IFHP, reducing, or eliminating access to health services for these groups. The government framed the changes around fairness and safety, stating that it would save tax payers $100 million over five years, reduce incentive for migrants with unfounded refugee claims from coming to Canada, protect public health and safety, and defend the integrity of the immigration system. With a Conservative majority, the reform was easily implemented despite a lack of evidence supporting these claims. In 2014, the Federal Court rejected the government's notion of fairness and safety, ruling that the cuts were cruel and unusual treatment of an already vulnerable population. The government appealed this ruling but, in 2016, the Liberals took power and restored funding to the IFHP to pre-2012 levels. Ad hoc evaluations predicted inequitable and adverse impacts on refugees, negative impacts on health, and increased costs to refugees, provincial governments, and health providers. Overall the threats and weaknesses of this reform clearly outweighed the few and unconvincing opportunities and strengths of the program, leading to its demise.

  20. Acceptable TRU packaging for interim storage and/or terminal isolation: FY-1977 final report

    International Nuclear Information System (INIS)

    Doty, J.W.; Peterson, J.B.

    1978-01-01

    A program was conducted for the definition and demonstration of acceptable waste packages for defense transuranic waste for interim storage and terminal isolation. During FY-1977, a Contractor Questionnaire was used to gather pertinent data and to assess contractor concerns. This information was integrated into basic application data in the form of a checklist. Conceptual Container Design Specifications were developed by analyzing and evaluating the application data against Federal Regulations and interim/terminal storage constraints

  1. Ontology-Based Method for Fault Diagnosis of Loaders.

    Science.gov (United States)

    Xu, Feixiang; Liu, Xinhui; Chen, Wei; Zhou, Chen; Cao, Bingwei

    2018-02-28

    This paper proposes an ontology-based fault diagnosis method which overcomes the difficulty of understanding complex fault diagnosis knowledge of loaders and offers a universal approach for fault diagnosis of all loaders. This method contains the following components: (1) An ontology-based fault diagnosis model is proposed to achieve the integrating, sharing and reusing of fault diagnosis knowledge for loaders; (2) combined with ontology, CBR (case-based reasoning) is introduced to realize effective and accurate fault diagnoses following four steps (feature selection, case-retrieval, case-matching and case-updating); and (3) in order to cover the shortages of the CBR method due to the lack of concerned cases, ontology based RBR (rule-based reasoning) is put forward through building SWRL (Semantic Web Rule Language) rules. An application program is also developed to implement the above methods to assist in finding the fault causes, fault locations and maintenance measures of loaders. In addition, the program is validated through analyzing a case study.

  2. The Homestake Interim Laboratory and Homestake DUSEL

    Science.gov (United States)

    Lesko, Kevin T.

    2011-12-01

    The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for

  3. The Homestake Interim Laboratory and Homestake DUSEL

    International Nuclear Information System (INIS)

    Lesko, Kevin T.

    2011-01-01

    The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for

  4. Metamorphic Testing Integer Overflow Faults of Mission Critical Program: A Case Study

    Directory of Open Access Journals (Sweden)

    Zhanwei Hui

    2013-01-01

    Full Text Available For mission critical programs, integer overflow is one of the most dangerous faults. Different testing methods provide several effective ways to detect the defect. However, it is hard to validate the testing outputs, because the oracle of testing is not always available or too expensive to get, unless the program throws an exception obviously. In the present study, the authors conduct a case study, where the authors apply a metamorphic testing (MT method to detect the integer overflow defect and alleviate the oracle problem in testing critical program of Traffic Collision Avoidance System (TCAS. Experimental results show that, in revealing typical integer mutations, compared with traditional safety property testing method, MT with a novel symbolic metamorphic relation is more effective than the traditional method in some cases.

  5. Determining on-fault magnitude distributions for a connected, multi-fault system

    Science.gov (United States)

    Geist, E. L.; Parsons, T.

    2017-12-01

    A new method is developed to determine on-fault magnitude distributions within a complex and connected multi-fault system. A binary integer programming (BIP) method is used to distribute earthquakes from a 10 kyr synthetic regional catalog, with a minimum magnitude threshold of 6.0 and Gutenberg-Richter (G-R) parameters (a- and b-values) estimated from historical data. Each earthquake in the synthetic catalog can occur on any fault and at any location. In the multi-fault system, earthquake ruptures are allowed to branch or jump from one fault to another. The objective is to minimize the slip-rate misfit relative to target slip rates for each of the faults in the system. Maximum and minimum slip-rate estimates around the target slip rate are used as explicit constraints. An implicit constraint is that an earthquake can only be located on a fault (or series of connected faults) if it is long enough to contain that earthquake. The method is demonstrated in the San Francisco Bay area, using UCERF3 faults and slip-rates. We also invoke the same assumptions regarding background seismicity, coupling, and fault connectivity as in UCERF3. Using the preferred regional G-R a-value, which may be suppressed by the 1906 earthquake, the BIP problem is deemed infeasible when faults are not connected. Using connected faults, however, a solution is found in which there is a surprising diversity of magnitude distributions among faults. In particular, the optimal magnitude distribution for earthquakes that participate along the Peninsula section of the San Andreas fault indicates a deficit of magnitudes in the M6.0- 7.0 range. For the Rodgers Creek-Hayward fault combination, there is a deficit in the M6.0- 6.6 range. Rather than solving this as an optimization problem, we can set the objective function to zero and solve this as a constraint problem. Among the solutions to the constraint problem is one that admits many more earthquakes in the deficit magnitude ranges for both faults

  6. Remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 groundwater operable units' interim action

    International Nuclear Information System (INIS)

    1996-09-01

    This document is a combination remedial design report and remedial action work plan for the 100-HR-3 and 100-KR-4 Operable Units (located on the Hanford Site in Richland, Washington) interim action. The interim actions described in this document represent the first of an ongoing program to address groundwater contamination in each operable unit. This document describes the design basis, provides a description of the interim action, and identifies how they will meet the requirements set forth in the interim action Record of Decision

  7. 1987 Federal interim storage fee study: A technical and economic analysis

    International Nuclear Information System (INIS)

    1987-09-01

    This document is the latest in a series of reports that are published annually by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This information in the report, which was prepared by E.R. Johnson Associates under subcontract to PNL, will be used by the DOE to establish a payment schedule for interim storage of spent nuclear fuel under the Federal Interim Storage (FIS) Program, which was mandated by the Nuclear Waste Policy Act of 1982. The information in this report will be used to establish the schedule of charges for FIS services for the year commencing January 1, 1988. 13 tabs

  8. 1987 Federal interim storage fee study: A technical and economic analysis

    Energy Technology Data Exchange (ETDEWEB)

    1987-09-01

    This document is the latest in a series of reports that are published annually by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This information in the report, which was prepared by E.R. Johnson Associates under subcontract to PNL, will be used by the DOE to establish a payment schedule for interim storage of spent nuclear fuel under the Federal Interim Storage (FIS) Program, which was mandated by the Nuclear Waste Policy Act of 1982. The information in this report will be used to establish the schedule of charges for FIS services for the year commencing January 1, 1988. 13 tabs.

  9. Used Fuel Logistics: Decades of Experience with transportation and Interim storage solutions

    Energy Technology Data Exchange (ETDEWEB)

    Orban, G.; Shelton, C.

    2015-07-01

    Used fuel inventories are growing worldwide. While some countries have opted for a closed cycle with recycling, numerous countries must expand their interim storage solutions as implementation of permanent repositories is taking more time than foreseen. In both cases transportation capabilities will have to be developed. AREVA TN has an unparalleled expertise with transportation of used fuel. For more than 50 years AREVA TN has safely shipped more than 7,000 used fuel transport casks. The transportation model that was initially developed in the 1970s has been adapted and enhanced over the years to meet more restrictive regulatory requirements and evolving customer needs, and to address public concerns. The numerous “lessons learned” have offered data and guidance that have allowed for also efficient and consistent improvement over the decades. AREVA TN has also an extensive experience with interim dry storage solutions in many countries on-site but also is working with partners to developed consolidated interim storage facility. Both expertise with storage and transportation contribute to safe, secure and smooth continuity of the operations. This paper will describe decades of experience with a very successful transportation program as well as interim storage solutions. (Author)

  10. Burn site groundwater interim measures work plan.

    Energy Technology Data Exchange (ETDEWEB)

    Witt, Jonathan L. (North Wind, Inc., Idaho Falls, ID); Hall, Kevin A. (North Wind, Inc., Idaho Falls, ID)

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  11. 24 CFR 35.1330 - Interim controls.

    Science.gov (United States)

    2010-04-01

    ... Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim..., cleanable covering or coating, such as metal coil stock, plastic, polyurethane, or linoleum. (3) Surfaces...

  12. AGR-1 Data Qualification Interim Report

    International Nuclear Information System (INIS)

    Abbott, Machael

    2009-01-01

    Projects for the very-high-temperature reactor (VHTR) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR Program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the data streams associated with the first Advanced Gas Reactor (AGR-1) experiment, the processing of these data within NDMAS, and reports the interim FY09 qualification status of the AGR-1 data to date. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category, which is assigned by the data generator, and include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing, to confirm that the data are an accurate representation of the system or object being measured, and (3) documentation that the data were collected under an NQA-1 or equivalent QA program. The interim qualification status of the following four data streams is reported in this document: (1) fuel fabrication data, (2) fuel irradiation data, (3) fission product monitoring system (FPMS) data, and (4) Advanced Test Reactor (ATR) operating conditions data. A final report giving the NDMAS qualification status of all AGR-1 data (including cycle 145A) is planned for February 2010

  13. Solid waste burial grounds interim safety analysis

    International Nuclear Information System (INIS)

    Saito, G.H.

    1994-01-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment

  14. Solid waste burial grounds interim safety analysis

    Energy Technology Data Exchange (ETDEWEB)

    Saito, G.H.

    1994-10-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment.

  15. Coordinated Fault Tolerance for High-Performance Computing

    Energy Technology Data Exchange (ETDEWEB)

    Dongarra, Jack; Bosilca, George; et al.

    2013-04-08

    Our work to meet our goal of end-to-end fault tolerance has focused on two areas: (1) improving fault tolerance in various software currently available and widely used throughout the HEC domain and (2) using fault information exchange and coordination to achieve holistic, systemwide fault tolerance and understanding how to design and implement interfaces for integrating fault tolerance features for multiple layers of the software stack—from the application, math libraries, and programming language runtime to other common system software such as jobs schedulers, resource managers, and monitoring tools.

  16. Interim-status groundwater monitoring plan for the 216-B-63 trench

    Energy Technology Data Exchange (ETDEWEB)

    Sweeney, M.D.

    1995-02-09

    This document outlines the groundwater monitoring plan, under RCRA regulations in 40 CFR 265 Subpart F and WAC173-300-400, for the 216-B-63 Trench. This interim status facility is being sampled under detection monitoring criteria and this plan provides current program conditions and requirements.

  17. Reliability Centered Maintenance for Savannah River Site's interim waste management facilities

    International Nuclear Information System (INIS)

    Hauer, K.A.; Wilson, J.F.

    1992-01-01

    The application of Reliability Centered Maintenance (RCM) has been shown to be an effective means to optimize maintenance programs or to establish new programs. The key to success of any RCM program is to customize the methodology to meet the specific needs of the implementing organization. This paper discusses how RCM is being used to establish the preventive maintenance program and how the resulting system data is being used to support the Technical Baseline reconstitution effort for the interim Waste Management Division of Westinghouse Savannah River Company (WSRC)

  18. Progress and future direction for the interim safe storage and disposal of Hanford high level waste (HLW)

    International Nuclear Information System (INIS)

    Wodrich, D.D.

    1996-01-01

    This paper describes the progress made at the largest environmental cleanup program in the United States. Substantial advances in methods to start interim safe storage of Hanford Site high-level wastes, waste characterization to support both safety- and disposal-related information needs, and proceeding with cost-effective disposal by the US DOE and its Hanford Site contractors, have been realized. Challenges facing the Tank Waste Remediation System Program, which is charged with the dual and parallel missions of interim safe storage and disposal of the high-level tank waste stored at the Hanford Site, are described

  19. Maywood Interim Storage Site environmental report for calendar year 1989, Maywood, New Jersey

    International Nuclear Information System (INIS)

    1990-05-01

    The environmental monitoring program, which began in 1984, was continued in 1989 at the Maywood Interim Storage Site (MISS), a US Department of Energy (DOE) facility located in the Borough of Maywood and the Township of Rochelle Park, New Jersey. MISS is currently used for storage of soils contaminated with low-level radioactivity. MISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials are present. The monitoring program at MISS measures thoron and radon concentrations in air; external gamma radiation levels; and thorium, uranium, and radium concentrations in surface water, groundwater, and sediment. Additionally, several nonradiological parameters are measured in groundwater. The radiation dose was calculated for a hypothetical maximally exposed individual to verify that the site is in compliance with the DOE radiation protection standard (100 mrem/yr) and to assess its potential effects on public health. This report presents the results of the environmental monitoring program conducted at the US Department of Energy's (DOE) Maywood Interim Storage Site (MISS) during calendar year 1989. Environmental monitoring began at MISS in 1984. 19 refs., 23 figs., 14 tabs

  20. Maywood Interim Storage Site environmental report for calendar year 1989, Maywood, New Jersey

    Energy Technology Data Exchange (ETDEWEB)

    1990-05-01

    The environmental monitoring program, which began in 1984, was continued in 1989 at the Maywood Interim Storage Site (MISS), a US Department of Energy (DOE) facility located in the Borough of Maywood and the Township of Rochelle Park, New Jersey. MISS is currently used for storage of soils contaminated with low-level radioactivity. MISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials are present. The monitoring program at MISS measures thoron and radon concentrations in air; external gamma radiation levels; and thorium, uranium, and radium concentrations in surface water, groundwater, and sediment. Additionally, several nonradiological parameters are measured in groundwater. The radiation dose was calculated for a hypothetical maximally exposed individual to verify that the site is in compliance with the DOE radiation protection standard (100 mrem/yr) and to assess its potential effects on public health. This report presents the results of the environmental monitoring program conducted at the US Department of Energy's (DOE) Maywood Interim Storage Site (MISS) during calendar year 1989. Environmental monitoring began at MISS in 1984. 19 refs., 23 figs., 14 tabs.

  1. Interim Evaluation of the Project P.A.T.H.S.: Findings Based on Different Datasets

    Directory of Open Access Journals (Sweden)

    Daniel T. L. Shek

    2012-01-01

    Full Text Available Interim evaluation studies were carried out in order to examine the implementation details of the Tier 1 Program of the Project P.A.T.H.S. (Positive Adolescent Training through Holistic Social Programmes in Hong Kong. Quantitative results of the interim evaluation findings based on eight datasets collected from 2006 to 2009 are reported in this paper. Three hundred and seventy-eight schools were randomly selected to provide information on the implementation details of the program via face-to-face interviews, telephone interviews, and self-completed questionnaires. Results showed that a majority of the workers perceived that the students had positive responses to the program and the program was helpful to the students. In conjunction with other process evaluation findings, the present study suggests that the implementation quality of the Tier 1 Program of the Project P.A.T.H.S. is high. The present study also provides support for the effectiveness of the Tier 1 Program of the Project P.A.T.H.S. in Hong Kong.

  2. Common faults in turbines and applying neural networks in order to fault diagnostic by vibration analysis

    International Nuclear Information System (INIS)

    Masoudifar, M.; AghaAmini, M.

    2001-01-01

    Today the fault diagnostic of the rotating machinery based on the vibration analysis is an effective method in designing predictive maintenance programs. In this method, vibration level of the turbines is monitored and if it is higher than the allowable limit, vibrational data will be analyzed and the growing faults will be detected. But because of the high complexity of the system monitoring, the interpretation of the measured data is more difficult. Therefore, design of the fault diagnostic expert systems by using the expert's technical experiences and knowledge; seem to be the best solution. In this paper,at first several common faults in turbines are studied and the how applying the neural networks to interpret the vibrational data for fault diagnostic is explained

  3. STEM - software test and evaluation methods: fault detection using static analysis techniques

    International Nuclear Information System (INIS)

    Bishop, P.G.; Esp, D.G.

    1988-08-01

    STEM is a software reliability project with the objective of evaluating a number of fault detection and fault estimation methods which can be applied to high integrity software. This Report gives some interim results of applying both manual and computer-based static analysis techniques, in particular SPADE, to an early CERL version of the PODS software containing known faults. The main results of this study are that: The scope for thorough verification is determined by the quality of the design documentation; documentation defects become especially apparent when verification is attempted. For well-defined software, the thoroughness of SPADE-assisted verification for detecting a large class of faults was successfully demonstrated. For imprecisely-defined software (not recommended for high-integrity systems) the use of tools such as SPADE is difficult and inappropriate. Analysis and verification tools are helpful, through their reliability and thoroughness. However, they are designed to assist, not replace, a human in validating software. Manual inspection can still reveal errors (such as errors in specification and errors of transcription of systems constants) which current tools cannot detect. There is a need for tools to automatically detect typographical errors in system constants, for example by reporting outliers to patterns. To obtain the maximum benefit from advanced tools, they should be applied during software development (when verification problems can be detected and corrected) rather than retrospectively. (author)

  4. Interim Sanitary Landfill Groundwater Monitoring Report. 1997 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-01

    Eight wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Interim Sanitary Landfill at the Savannah River Site (SRS). These wells are sampled semiannually to comply with the South Carolina Department of Health and Environmental Control Modified Municipal Solid Waste Permit 025500-1120 (formerly dWP-087A) and as part of the SRS Groundwater Monitoring Program.

  5. Wayne Interim Storage Site annual environmental report for calendar year 1991, Wayne, New Jersey. [Wayne Interim Storage Site

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-09-01

    This document describes the envirormental monitoring program at the Wayne Interim Storage Site (WISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of WISS and surrounding area began in 1984 when Congress added the site to the US Department of Energy's (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. WISS is a National Priorities List site. The environmental monitoring program at WISS includes sampling networks for radon and thoron concentrations in air; external gamma radiation exposure; and radium-226, radium-228, thorium-232, and total uranium concentrations in surface water, sediment, and groundwater. Several nonradiological parameters are also measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides, dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.

  6. Maywood Interim Storage Site annual environmental report for calendar year 1991, Maywood, New Jersey. [Maywood Interim Storage Site

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-09-01

    This document describes the environmental monitoring program at the Maywood Interim Storage Site (MISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of MISS began in 1984 when congress added the site to the US Department of Energy's (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at MISS includes sampling networks for radon and thoron concentrations in air; external gamma radiation-exposure; and total uranium, radium-226, radium-228, thorium-232, and thorium-230 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.

  7. Interim analysis: A rational approach of decision making in clinical trial.

    Science.gov (United States)

    Kumar, Amal; Chakraborty, Bhaswat S

    2016-01-01

    Interim analysis of especially sizeable trials keeps the decision process free of conflict of interest while considering cost, resources, and meaningfulness of the project. Whenever necessary, such interim analysis can also call for potential termination or appropriate modification in sample size, study design, and even an early declaration of success. Given the extraordinary size and complexity today, this rational approach helps to analyze and predict the outcomes of a clinical trial that incorporate what is learned during the course of a study or a clinical development program. Such approach can also fill the gap by directing the resources toward relevant and optimized clinical trials between unmet medical needs and interventions being tested currently rather than fulfilling only business and profit goals.

  8. Interim analysis: A rational approach of decision making in clinical trial

    Directory of Open Access Journals (Sweden)

    Amal Kumar

    2016-01-01

    Full Text Available Interim analysis of especially sizeable trials keeps the decision process free of conflict of interest while considering cost, resources, and meaningfulness of the project. Whenever necessary, such interim analysis can also call for potential termination or appropriate modification in sample size, study design, and even an early declaration of success. Given the extraordinary size and complexity today, this rational approach helps to analyze and predict the outcomes of a clinical trial that incorporate what is learned during the course of a study or a clinical development program. Such approach can also fill the gap by directing the resources toward relevant and optimized clinical trials between unmet medical needs and interventions being tested currently rather than fulfilling only business and profit goals.

  9. 24 CFR 982.516 - Family income and composition: Regular and interim examinations.

    Science.gov (United States)

    2010-04-01

    ... VOUCHER PROGRAM Rent and Housing Assistance Payment § 982.516 Family income and composition: Regular and... assistance payment. (For a voucher tenancy, the housing assistance payment shall be calculated in accordance... the housing assistance payment resulting from an interim redetermination. (2) At the effective date of...

  10. PV Systems Reliability Final Technical Report: Ground Fault Detection

    Energy Technology Data Exchange (ETDEWEB)

    Lavrova, Olga [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Flicker, Jack David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Johnson, Jay [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-01-01

    We have examined ground faults in PhotoVoltaic (PV) arrays and the efficacy of fuse, current detection (RCD), current sense monitoring/relays (CSM), isolation/insulation (Riso) monitoring, and Ground Fault Detection and Isolation (GFID) using simulations based on a Simulation Program with Integrated Circuit Emphasis SPICE ground fault circuit model, experimental ground faults installed on real arrays, and theoretical equations.

  11. Two Trees: Migrating Fault Trees to Decision Trees for Real Time Fault Detection on International Space Station

    Science.gov (United States)

    Lee, Charles; Alena, Richard L.; Robinson, Peter

    2004-01-01

    We started from ISS fault trees example to migrate to decision trees, presented a method to convert fault trees to decision trees. The method shows that the visualizations of root cause of fault are easier and the tree manipulating becomes more programmatic via available decision tree programs. The visualization of decision trees for the diagnostic shows a format of straight forward and easy understands. For ISS real time fault diagnostic, the status of the systems could be shown by mining the signals through the trees and see where it stops at. The other advantage to use decision trees is that the trees can learn the fault patterns and predict the future fault from the historic data. The learning is not only on the static data sets but also can be online, through accumulating the real time data sets, the decision trees can gain and store faults patterns in the trees and recognize them when they come.

  12. A Framework For Evaluating Comprehensive Fault Resilience Mechanisms In Numerical Programs

    Energy Technology Data Exchange (ETDEWEB)

    Chen, S. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Peng, L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bronevetsky, G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-01-09

    As HPC systems approach Exascale, their circuit feature will shrink, while their overall size will grow, all at a fixed power limit. These trends imply that soft faults in electronic circuits will become an increasingly significant problem for applications that run on these systems, causing them to occasionally crash or worse, silently return incorrect results. This is motivating extensive work on application resilience to such faults, ranging from generic techniques such as replication or checkpoint/restart to algorithm-specific error detection and resilience techniques. Effective use of such techniques requires a detailed understanding of (1) which vulnerable parts of the application are most worth protecting (2) the performance and resilience impact of fault resilience mechanisms on the application. This paper presents FaultTelescope, a tool that combines these two and generates actionable insights by presenting in an intuitive way application vulnerabilities and impact of fault resilience mechanisms on applications.

  13. Runtime Speculative Software-Only Fault Tolerance

    Science.gov (United States)

    2012-06-01

    Threading DAFT [67] 1× Yes 2 - Most None 38% - Process-based PLR [49] 2× No 2 3 Most Some 16.9% 41% Redundancy RSFT[This Thesis] 2× No 2 2 Most All 3.54...with lower fault cover- age. Redundant multi-threading techniques (e.g. SRMT [60] and DAFT [67]) use multiple threads to execute program codes...fault detection, such as EDDI [35], SWIFT [44], SRMT [60], DAFT [67], and Shoestring [12], all require program source code for recompilation, and cannot

  14. Interim Administrators in Higher Education: A National Study

    Science.gov (United States)

    Huff, Marie Thielke; Neubrander, Judy

    2015-01-01

    The focus of this paper is on the roles and experiences of interim administrators in higher education. A survey was given to current and recent interim administrators in four-year public universities and colleges across the United States. The goals were to identify the advantages and disadvantages of using and serving as interims, and to solicit…

  15. Engineering Task Plan for Hose-In-Hose Transfer Lines for the Interim Stabilization Program

    International Nuclear Information System (INIS)

    TORRES, T.D.

    2000-01-01

    The document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of S/SX and U Tank Farms

  16. Fault-Tolerant Robot Programming through Simulation with Realistic Sensor Models

    Directory of Open Access Journals (Sweden)

    Axel Waggershauser

    2008-11-01

    Full Text Available We introduce a simulation system for mobile robots that allows a realistic interaction of multiple robots in a common environment. The simulated robots are closely modeled after robots from the EyeBot family and have an identical application programmer interface. The simulation supports driving commands at two levels of abstraction as well as numerous sensors such as shaft encoders, infrared distance sensors, and compass. Simulation of on-board digital cameras via synthetic images allows the use of image processing routines for robot control within the simulation. Specific error models for actuators, distance sensors, camera sensor, and wireless communication have been implemented. Progressively increasing error levels for an application program allows for testing and improving its robustness and fault-tolerance.

  17. Direct evaluation of fault trees using object-oriented programming techniques

    Science.gov (United States)

    Patterson-Hine, F. A.; Koen, B. V.

    1989-01-01

    Object-oriented programming techniques are used in an algorithm for the direct evaluation of fault trees. The algorithm combines a simple bottom-up procedure for trees without repeated events with a top-down recursive procedure for trees with repeated events. The object-oriented approach results in a dynamic modularization of the tree at each step in the reduction process. The algorithm reduces the number of recursive calls required to solve trees with repeated events and calculates intermediate results as well as the solution of the top event. The intermediate results can be reused if part of the tree is modified. An example is presented in which the results of the algorithm implemented with conventional techniques are compared to those of the object-oriented approach.

  18. Subsurface Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document, Operable Unit No. 2

    International Nuclear Information System (INIS)

    1992-01-01

    The subject Interim Measures/Interim Remedial Action plan/Environmental Assessment (IM/IRAP/EA) addresses residual free-phase volatile organic compound (VOC) contamination suspected in the subsurface within an area identified as Operable Unit No. 2 (OU2). This IM/IRAP/EA also addresses radionuclide contamination beneath the 903 Pad at OU2. Although subsurface VOC and radionuclide contamination on represent a source of OU2 ground-water contamination, they pose no immediate threat to public health or the environment. This IM/IRAP/EA identifies and evaluates interim remedial actions for removal of residual free-phase VOC contamination from three different subsurface environments at OU2. The term ''residual'' refers to the non-aqueous phase contamination remaining in the soil matrix (by capillary force) subsequent to the passage of non-aqueous or free-phase liquid through the subsurface. In addition to the proposed actions, this IM/IRAP/EA presents an assessment of the No Action Alternative. This document also considers an interim remedial action for the removal of radionuclides from beneath the 903 Pad

  19. Engineering Task Plan for Hose-In-Hose Transfer Lines for the Interim Stabilization Program

    International Nuclear Information System (INIS)

    RUNG, M.P.

    2000-01-01

    This document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of nine tanks in the 241-S/SX Tank Farms

  20. System and method for bearing fault detection using stator current noise cancellation

    Science.gov (United States)

    Zhou, Wei; Lu, Bin; Habetler, Thomas G.; Harley, Ronald G.; Theisen, Peter J.

    2010-08-17

    A system and method for detecting incipient mechanical motor faults by way of current noise cancellation is disclosed. The system includes a controller configured to detect indicia of incipient mechanical motor faults. The controller further includes a processor programmed to receive a baseline set of current data from an operating motor and define a noise component in the baseline set of current data. The processor is also programmed to repeatedly receive real-time operating current data from the operating motor and remove the noise component from the operating current data in real-time to isolate any fault components present in the operating current data. The processor is then programmed to generate a fault index for the operating current data based on any isolated fault components.

  1. Decision on performing interim analysis for comparative clinical trials.

    Science.gov (United States)

    Pak, Kyongsun; Jacobus, Susanna; Uno, Hajime

    2017-09-01

    In randomized-controlled trials, interim analyses are often planned for possible early trial termination to claim superiority or futility of a new therapy. While unblinding is necessary to conduct the formal interim analysis in blinded studies, blinded data also have information about the potential treatment difference between the groups. We developed a blinded data monitoring tool that enables investigators to predict whether they observe such an unblinded interim analysis results that supports early termination of the trial. Investigators may skip some of the planned interim analyses if an early termination is unlikely. We specifically focused on blinded, randomized-controlled studies to compare binary endpoints of a new treatment with a control. Assuming one interim analysis is planned for early termination for superiority or futility, we conducted extensive simulation studies to assess the impact of the implementation of our tool on the size, power, expected number of interim analyses, and bias in the treatment effect. The numerical study showed the proposed monitoring tool does not affect size or power, but dramatically reduces the expected number of interim analyses when the effect of the treatment difference is small. The tool serves as a useful reference when interpreting the summary of the blinded data throughout the course of the trial, without losing integrity of the study. This tool could potentially save the study resources and budget by avoiding unnecessary interim analyses.

  2. Addendum to IFMIF-CDA interim report

    Energy Technology Data Exchange (ETDEWEB)

    Maekawa, Hiroshi; Ida, Mizuho [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; eds.

    1996-08-01

    During the second IFMIF-CDA Design Integration Workshop, the conceptual design and contents of `IFMIF-CDA Interim Report` were examined and discussed at both general and group meetings. Based on these discussion, the final IFMIF-CDA Report will be modified from the `Interim Report`. This report describes the outline of these modification. (author)

  3. Addendum to IFMIF-CDA interim report

    International Nuclear Information System (INIS)

    Maekawa, Hiroshi; Ida, Mizuho

    1996-08-01

    During the second IFMIF-CDA Design Integration Workshop, the conceptual design and contents of 'IFMIF-CDA Interim Report' were examined and discussed at both general and group meetings. Based on these discussion, the final IFMIF-CDA Report will be modified from the 'Interim Report'. This report describes the outline of these modification. (author)

  4. Systems management support for ERCDC study of undergrounding and berm containment. Interim report. Preliminary program assessment and follow-on program development

    Energy Technology Data Exchange (ETDEWEB)

    1977-08-01

    Interim results of a study being conducted with respect to the technological aspects of the costs and benefits of underground nuclear power plant construction in direct support of the California Energy Commission's legislative mandate in this area are presented. The program was directed towards problem scoping, methodology evaluation, program definition and planning for subsequent, more detailed investigations of underground facility designs and their potential advantages and disadvantages. The material presented describes the results of (a) systems analyses which were conducted to determine logical requirements for determination of those elements of a nuclear power plant which should be constructed underground; (b) bounding estimates of incremental plant costs for a variety of underground concepts; (c) applicable prior experience in underground facility design and construction which could be used to identify potential sources of strength and weaknessees of underground nuclear power plants; (d) estimates of seismic environments for underground construction in California; (e) preliminary descriptions of underground reactor accident scenarios; (f) bounding estimates of the consequences of such accidents, in terms of comparisons of relative emissions of radioactivity with respect to similar accidents for surface-sited nuclear power plants and (g) results of analyses of several other important technological aspects of the problem. A description is also provided of the program development work performed to provide planning and criteria for subsequent investigations to determine: (a) definitive underground nuclear power plant designs and costs, and (b) estimates of accident consequences in underground nuclear power plants.

  5. Systems management support for ERCDC study of undergrounding and berm containment. Interim report. Preliminary program assessment and follow-on program development

    International Nuclear Information System (INIS)

    1977-08-01

    Interim results of a study being conducted with respect to the technological aspects of the costs and benefits of underground nuclear power plant construction in direct support of the California Energy Commission's legislative mandate in this area are presented. The program was directed towards problem scoping, methodology evaluation, program definition and planning for subsequent, more detailed investigations of underground facility designs and their potential advantages and disadvantages. The material presented describes the results of (a) systems analyses which were conducted to determine logical requirements for determination of those elements of a nuclear power plant which should be constructed underground; (b) bounding estimates of incremental plant costs for a variety of underground concepts; (c) applicable prior experience in underground facility design and construction which could be used to identify potential sources of strength and weaknessees of underground nuclear power plants; (d) estimates of seismic environments for underground construction in California; (e) preliminary descriptions of underground reactor accident scenarios; (f) bounding estimates of the consequences of such accidents, in terms of comparisons of relative emissions of radioactivity with respect to similar accidents for surface-sited nuclear power plants and (g) results of analyses of several other important technological aspects of the problem. A description is also provided of the program development work performed to provide planning and criteria for subsequent investigations to determine: (a) definitive underground nuclear power plant designs and costs, and (b) estimates of accident consequences in underground nuclear power plants

  6. Sustainable Solutions for Nuclear used Fuels Interim Storage

    International Nuclear Information System (INIS)

    Arslan, Marc; Favet, Dominique; Issard, Herve; Le Jemtel, Amaury; Drevon, Caroline

    2014-01-01

    AREVA has a unique experience in providing sustainable solutions for used fuel management, fitted with the needs of different customers in the world and with regulation in different countries. These solutions entail both recycling and interim storage technologies. In a first part, we will describe the various types of solutions for Interim Storage of UNF that have been implemented around the world for interim storage at reactor or centralized Pad solution in canisters dry storage, vault type storages for dry storage, dry storage of transportation casks (dual purpose) pools for wet storage, The experience for all these different families of interim storages in which AREVA is involved is extensive and will be discussed with respect to the new challenges: increase of the duration of the interim storage (long term interim storage) increase of burn up of the fuels In a second part of the presentation, special recycling features will be presented. In that case, interim storage of the used fuels is ensured in pools. This provides in the long term good conditions for the behaviour of the fuel and its retrievability. With recycling, the final waste (Universal Canister of vitrified fission products and compacted hulls and end pieces): is stable and licensed in many countries for the final disposal (France, UK, Belgium, NL, Switzerland, Germany, Japan, upcoming: Spain, Australia, Italy). Presents neither safety criticality risks nor proliferation risks (AREVA conditioned HLW and LL-ILW are free of IAEA safeguard constraints thanks to AREVA process high recovery and purification yields). It can therefore be safely stored in interim storage for more than 100 years before final disposal. Some economic considerations will also be discussed. In particular, in the case of long term interim storage of used fuels, there are growing uncertainties regarding the future needs of repackaging and transportation, which can result in future cost overruns. Meanwhile, in the recycling policy

  7. Retention of long-term interim restorations with sodium fluoride enriched interim cement

    Science.gov (United States)

    Strash, Carolyn

    Purpose: Interim fixed dental prostheses, or "provisional restorations", are fabricated to restore teeth when definitive prostheses are made indirectly. Patients undergoing extensive prosthodontic treatment frequently require provisionalization for several months or years. The ideal interim cement would retain the restoration for as long as needed and still allow for ease of removal. It would also avoid recurrent caries by preventing demineralization of tooth structure. This study aims to determine if adding sodium fluoride varnish to interim cement may assist in the retention of interim restorations. Materials and methods: stainless steel dies representing a crown preparation were fabricated. Provisional crowns were milled for the dies using CAD/CAM technology. Crowns were provisionally cemented onto the dies using TempBond NE and NexTemp provisional cements as well as a mixture of TempBond NE and Duraphat fluoride varnish. Samples were stored for 24h then tested or thermocycled for 2500 or 5000 cycles before being tested. Retentive strength of each cement was recorded using a universal testing machine. Results: TempBond NE and NexTemp cements performed similarly when tested after 24h. The addition of Duraphat significantly decreased the retention when added to TempBond NE. NexTemp cement had high variability in retention over all tested time periods. Thermocycling for 2500 and 5000 cycles significantly decreased the retention of all cements. Conclusions: The addition of Duraphat fluoride varnish significantly decreased the retention of TempBond NE and is therefore not recommended for clinical use. Thermocycling significantly reduced the retention of TempBond NE and NexTemp. This may suggest that use of these cements for three months, as simulated in this study, is not recommended.

  8. Fusion magnet safety studies program: superconducting magnet protection system and failure. Interim report

    International Nuclear Information System (INIS)

    Allinger, J.; Danby, G.; Hsieh, S.Y.; Keane, J.; Powell, J.; Prodell, A.

    1975-11-01

    This report includes the first two quarters study of available information on schemes for protecting superconducting magnets. These schemes can be divided into two different categories. The first category deals with the detection of faulty regions (or normal regions) in the magnet. The second category relates to the protection of the magnet when a fault is detected, and the derived signal which can be used to activate a safety system (or energy removal system). The general detection and protection methods are first described briefly and then followed by a survey of the protection systems used by different laboratories for various magnets. A survey of the cause of the magnet difficulties or failures is also included. A preliminary discussion of these protection schemes and the experimental development of this program is given

  9. The Nord interim store

    International Nuclear Information System (INIS)

    Leushacke, D.F.; Rittscher, D.

    1996-01-01

    In line with the decision taken in 1990 to shut down and decommission the Greifswald and Rheinsberg Nuclear Power Stations, the waste management concept of the Energiewerke Nord is based on direct and complete decommissioning of the six shut down reactor units within the next fifteen years. One key element of this concept is the construction and use of the Zwischenlager Nord (Nord Interim Store, ZLN) for holding the existing nuclear fuels and for interim and decay storage of the radioactive materials arising in decommissioning and demolition. The owner and operator of the store is Energiewerke Nord GmbH. The interim store has the functions of a processing and Energiewerke Nord GmbH. The interim store has the functions of a processing and treatment station and buffer store for the flows of residues arising. As a radioactive waste management station, it accommodates nuclear fuels, radioactive waste or residues which are not treated any further. It is used as a buffer store to allow the materials accumulating in disassembly to be stored temporarily before or after treatment in order to ensure continuous loading of the treatment plants. When operated as a processing station, the ZLN is able to handle nearly all types of radioactive waste and residues arising, except for nuclear fuels. These installations allow the treatment of radioactive residues to be separated from the demolition work both physically and in time. The possibilities of interium storage and buffer storage of untreated waste and waste packages make for high flexibility in logistics and waste management strategy. (orig.) [de

  10. Interim storage of radioactive waste packages

    International Nuclear Information System (INIS)

    1998-01-01

    This report covers all the principal aspects of production and interim storage of radioactive waste packages. The latest design solutions of waste storage facilities and the operational experiences of developed countries are described and evaluated in order to assist developing Member States in decision making and design and construction of their own storage facilities. This report is applicable to any category of radioactive waste package prepared for interim storage, including conditioned spent fuel, high level waste and sealed radiation sources. This report addresses the following issues: safety principles and requirements for storage of waste packages; treatment and conditioning methods for the main categories of radioactive waste; examples of existing interim storage facilities for LILW, spent fuel and high level waste; operational experience of Member States in waste storage operations including control of storage conditions, surveillance of waste packages and observation of the behaviour of waste packages during storage; retrieval of waste packages from storage facilities; technical and administrative measures that will ensure optimal performance of waste packages subject to various periods of interim storage

  11. Terrestrial gravity data analysis for interim gravity model improvement

    Science.gov (United States)

    1987-01-01

    This is the first status report for the Interim Gravity Model research effort that was started on June 30, 1986. The basic theme of this study is to develop appropriate models and adjustment procedures for estimating potential coefficients from terrestrial gravity data. The plan is to use the latest gravity data sets to produce coefficient estimates as well as to provide normal equations to NASA for use in the TOPEX/POSEIDON gravity field modeling program.

  12. FTA, Fault Tree Analysis for Minimal Cut Sets, Graphics for CALCOMP

    International Nuclear Information System (INIS)

    Van Slyke, W.J.; Griffing, D.E.; Diven, J.

    1978-01-01

    1 - Description of problem or function: The FTA (Fault Tree Analysis) system was designed to predict probabilities of the modes of failure for complex systems and to graphically present the structure of systems. There are three programs in the system. Program ALLCUTS performs the calculations. Program KILMER constructs a CalComp plot file of the system fault tree. Program BRANCH builds a cross-reference list of the system fault tree. 2 - Method of solution: ALLCUTS employs a top-down set expansion algorithm to find fault tree cut-sets and then optionally calculates their probability using a currently accepted cut-set quantification method. The methodology is adapted from that in WASH-1400 (draft), August 1974. 3 - Restrictions on the complexity of the problem: Maxima of: 175 basic events, 425 rate events. ALLCUTS may be expanded to solve larger problems depending on available core memory

  13. Managing systems faults on the commercial flight deck: Analysis of pilots' organization and prioritization of fault management information

    Science.gov (United States)

    Rogers, William H.

    1993-01-01

    In rare instances, flight crews of commercial aircraft must manage complex systems faults in addition to all their normal flight tasks. Pilot errors in fault management have been attributed, at least in part, to an incomplete or inaccurate awareness of the fault situation. The current study is part of a program aimed at assuring that the types of information potentially available from an intelligent fault management aiding concept developed at NASA Langley called 'Faultfinde' (see Abbott, Schutte, Palmer, and Ricks, 1987) are an asset rather than a liability: additional information should improve pilot performance and aircraft safety, but it should not confuse, distract, overload, mislead, or generally exacerbate already difficult circumstances.

  14. Reliability Centered Maintenance for Savannah River Site's interim waste management facilities

    Energy Technology Data Exchange (ETDEWEB)

    Hauer, K.A. (Westinghouse Savannah River Co., Aiken, SC (United States)); Wilson, J.F. (PRC, Inc. (US))

    1992-01-01

    The application of Reliability Centered Maintenance (RCM) has been shown to be an effective means to optimize maintenance programs or to establish new programs. The key to success of any RCM program is to customize the methodology to meet the specific needs of the implementing organization. This paper discusses how RCM is being used to establish the preventive maintenance program and how the resulting system data is being used to support the Technical Baseline reconstitution effort for the interim Waste Management Division of Westinghouse Savannah River Company (WSRC).

  15. A program PULSYN01 for wide-band simulation of source radiation from a finite earthquake source/fault

    International Nuclear Information System (INIS)

    Gusev, A.A.

    2001-12-01

    The purpose of the program PULSYN01 is to apply a realistic wideband source-side input for calculation of earthquake ground motion. The source is represented as a grid of point subsources, and their seismic moment rate time functions are generated considering each of them as realizations (sample functions) of a non-stationary random process. The model is intended for use at receiver-to fault distances from far field to as small as 10-20% of the fault width. Combined with an adequate Green's function synthesizer, PULSUNT01 can be used for assessment of possible ground motion and seismic hazard in many ways, including scenario event simulation, parametric studies, and eventually stochastic hazard calculations

  16. 76 FR 19909 - International Terrorism Victim Expense Reimbursement Program

    Science.gov (United States)

    2011-04-11

    ... 1121-AA78 International Terrorism Victim Expense Reimbursement Program AGENCY: Office of Justice... promulgating this interim-final rule for its International Terrorism Victim Expense Reimbursement Program... international terrorism. DATES: Effective date: This interim-final rule is effective April 11, 2011. Comment...

  17. All-to-all sequenced fault detection system

    Science.gov (United States)

    Archer, Charles Jens; Pinnow, Kurt Walter; Ratterman, Joseph D.; Smith, Brian Edward

    2010-11-02

    An apparatus, program product and method enable nodal fault detection by sequencing communications between all system nodes. A master node may coordinate communications between two slave nodes before sequencing to and initiating communications between a new pair of slave nodes. The communications may be analyzed to determine the nodal fault.

  18. 76 FR 58790 - Notice of Interim Approval

    Science.gov (United States)

    2011-09-22

    ... to the customers. Rate Scenario 3--Original Cumberland Marketing Policy The third rate alternative... an interim basis to the customers. Rate Scenario 3--Original Cumberland Marketing Policy The third... allocated on an interim basis to the customers. Rate Scenario 3--Original Cumberland Marketing Policy The...

  19. Interim site characterization report and ground-water monitoring program for the Hanford site solid waste landfill

    International Nuclear Information System (INIS)

    Fruland, R.M.; Hagan, R.A.; Cline, C.S.; Bates, D.J.; Evans, J.C.; Aaberg, R.L.

    1989-07-01

    Federal and state regulations governing the operation of landfills require utilization of ground-water monitoring systems to determine whether or not landfill operations impact ground water at the point of compliance (ground water beneath the perimeter of the facility). A detection-level ground-water monitoring system was designed, installed, and initiated at the Hanford Site Solid Waste Landfill (SWL). Chlorinated hydrocarbons were detected at the beginning of the ground-water monitoring program and continue to be detected more than 1 year later. The most probable source of the chlorinated hydrocarbons is washwater discharged to the SWL between 1985 and 1987. This is an interim report and includes data from the characterization work that was performed during well installation in 1987, such as field observations, sediment studies, and geophysical logging results, and data from analyses of ground-water samples collected in 1987 and 1988, such as field parameter measurements and chemical analyses. 38 refs., 27 figs., 8 tabs

  20. Diesel Emission Control -- Sulfur Effects (DECSE) Program; Phase I Interim Date Report No. 3: Diesel Fuel Sulfur Effects on Particulate Matter Emissions

    Energy Technology Data Exchange (ETDEWEB)

    DOE; ORNL; NREL; EMA; MECA

    1999-11-15

    The Diesel Emission Control-Sulfur Effects (DECSE) is a joint government/industry program to determine the impact of diesel fuel sulfur levels on emission control systems whose use could lower emissions of nitrogen oxides (NO{sub x}) and particulate matter (PM) from on-highway trucks in the 2002--2004 model years. Phase 1 of the program was developed with the following objectives in mind: (1) evaluate the effects of varying the level of sulfur content in the fuel on the emission reduction performance of four emission control technologies; and (2) measure and compare the effects of up to 250 hours of aging on selected devices for multiple levels of fuel sulfur content. This interim report covers the effects of diesel fuel sulfur level on particulate matter emissions for four technologies.

  1. KCUT, code to generate minimal cut sets for fault trees

    International Nuclear Information System (INIS)

    Han, Sang Hoon

    2008-01-01

    1 - Description of program or function: KCUT is a software to generate minimal cut sets for fault trees. 2 - Methods: Expand a fault tree into cut sets and delete non minimal cut sets. 3 - Restrictions on the complexity of the problem: Size and complexity of the fault tree

  2. The Interim Financial Statements: The Case of Greece

    OpenAIRE

    Rogdaki, E.I.; Kazantzis, Ch.

    1999-01-01

    The following paper refers to the accounting and auditing issues which emerge in the preparation of the interim financial statements of the companies: Firstly, the interim financial statements are defined as being the financial statements that provide useful information about the financial position and the financial results of a company which are realized and accrued during the fiscal year. The interim financial statements can be prepared on a monthly basis, on a quarterly basis or covering a...

  3. The cost and impact of the interim federal health program cuts on child refugees in Canada.

    Directory of Open Access Journals (Sweden)

    Andrea Evans

    Full Text Available INTRODUCTION: On June 30, 2012, Interim Federal Health Program (IFHP funding was cut for refugee claimant healthcare. The potential financial and healthcare impacts of these cuts on refugee claimants are unknown. METHODS: We conducted a one-year retrospective chart review spanning 6 months before and after IFHP funding cuts at The Hospital for Sick Children, a tertiary care children's hospital in Toronto. We analyzed emergency room visits characteristics, admission rates, reasons for admission, and financial records including billing from Medavie Blue Cross. RESULTS: There were 173 refugee children visits to the emergency room in the six months before and 142 visits in the six months after funding cuts. The total amount billed to the IFHP program during the one-year of this study was $131,615. Prior to the IFHP cuts, 46% of the total emergency room bills were paid by IFHP compared to 7% after the cuts (p<0.001. INTERPRETATION: After the cuts to the IFHP, The Hospital for Sick Children was unable to obtain federal health coverage for the vast majority of refugee claimant children registered under the IFHP. This preliminary analysis showed that post-IFHP cuts healthcare costs at the largest tertiary pediatric institution in the country increased.

  4. Integrated fault tree development environment

    International Nuclear Information System (INIS)

    Dixon, B.W.

    1986-01-01

    Probabilistic Risk Assessment (PRA) techniques are utilized in the nuclear industry to perform safety analyses of complex defense-in-depth systems. A major effort in PRA development is fault tree construction. The Integrated Fault Tree Environment (IFTREE) is an interactive, graphics-based tool for fault tree design. IFTREE provides integrated building, editing, and analysis features on a personal workstation. The design philosophy of IFTREE is presented, and the interface is described. IFTREE utilizes a unique rule-based solution algorithm founded in artificial intelligence (AI) techniques. The impact of the AI approach on the program design is stressed. IFTREE has been developed to handle the design and maintenance of full-size living PRAs and is currently in use

  5. Mechanical Models of Fault-Related Folding

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, A. M.

    2003-01-09

    The subject of the proposed research is fault-related folding and ground deformation. The results are relevant to oil-producing structures throughout the world, to understanding of damage that has been observed along and near earthquake ruptures, and to earthquake-producing structures in California and other tectonically-active areas. The objectives of the proposed research were to provide both a unified, mechanical infrastructure for studies of fault-related foldings and to present the results in computer programs that have graphical users interfaces (GUIs) so that structural geologists and geophysicists can model a wide variety of fault-related folds (FaRFs).

  6. Microcomputer applications of, and modifications to, the modular fault trees

    International Nuclear Information System (INIS)

    Zimmerman, T.L.; Graves, N.L.; Payne, A.C. Jr.; Whitehead, D.W.

    1994-10-01

    The LaSalle Probabilistic Risk Assessment was the first major application of the modular logic fault trees after the IREP program. In the process of performing the analysis, many errors were discovered in the fault tree modules that led to difficulties in combining the modules to form the final system fault trees. These errors are corrected in the revised modules listed in this report. In addition, the application of the modules in terms of editing them and forming them into the system fault trees was inefficient. Originally, the editing had to be done line by line and no error checking was performed by the computer. This led to many typos and other logic errors in the construction of the modular fault tree files. Two programs were written to help alleviate this problem: (1) MODEDIT - This program allows an operator to retrieve a file for editing, edit the file for the plant specific application, perform some general error checking while the file is being modified, and store the file for later use, and (2) INDEX - This program checks that the modules that are supposed to form one fault tree all link up appropriately before the files are,loaded onto the mainframe computer. Lastly, the modules were not designed for relay type logic common in BWR designs but for solid state type logic. Some additional modules were defined for modeling relay logic, and an explanation and example of their use are included in this report

  7. Waste resources utilization program. Interim report, June 30, 1976

    International Nuclear Information System (INIS)

    1976-07-01

    This is an interim report on the effects of the combined use of heat and ionizing radiation (thermoradiation) as a treatment for ridding sewage sludge of pathogenic organisms as well as its effect on the physical-chemical properties. This activity couples two major environmental problems, disposition of human and of nuclear waste, in an attempt to provide a framework in which both will become useful resources. This combined treatment might be chosen to inactivate both heat labile (but possibly radiation resistant) and radiation labile (but possibly heat resistant) organisms. The cost-effective analyses of such a treatment are being examined. Sludge treated with thermoradiation offers considerable potential for use as a fertilizer in agriculture or a soil conditioner for land reclamation free of the potential health hazards associated with conventional methods of land disposal. Treated sludge may also provide a low-cost substitute for high-nutritional components in ruminant diets

  8. Strain Partitioning and Present-Day Fault Kinematics in NW Tibet From Envisat SAR Interferometry

    Science.gov (United States)

    Daout, Simon; Doin, Marie-Pierre; Peltzer, Gilles; Lasserre, Cécile; Socquet, Anne; Volat, Matthieu; Sudhaus, Henriette

    2018-03-01

    An 8 year archive of Envisat synthetic aperture radar (SAR) data over a 300 × 500 km2 wide area in northwestern Tibet is analyzed to construct a line-of-sight map of the current surface velocity field. The resulting velocity map reveals (1) a velocity gradient across the Altyn Tagh fault, (2) a sharp velocity change along a structure following the base of the alluvial fans in southern Tarim, and (3) a broad velocity gradient, following the Jinsha suture. The interferometric synthetic aperture radar velocity field is combined with published GPS data to constrain the geometry and slip rates of a fault model consisting of a vertical fault plane under the Altyn Tagh fault and a shallow flat décollement ending in a steeper ramp on the Tarim side. The solutions converge toward 0.7 mm/yr of pure thrusting on the décollement-ramp system and 10.5 mm/yr of left-lateral strike-slip movement on the Altyn Tagh fault, below a 17 km locking depth. A simple elastic dislocation model across the Jinsha suture shows that data are consistent with 4-8 mm/yr of left-lateral shear across this structure. Interferometric synthetic aperture radar processing steps include implementing a stepwise unwrapping method starting with high-quality interferograms to assist in unwrapping noisier interferograms, iteratively estimating long-wavelength spatial ramps, and referencing all interferograms to bedrock pixels surrounding sedimentary basins. A specific focus on atmospheric delay estimation using the ERA-Interim model decreases the uncertainty on the velocity across the Tibet border by a factor of 2.

  9. Fault detection and initial state verification by linear programming for a class of Petri nets

    Science.gov (United States)

    Rachell, Traxon; Meyer, David G.

    1992-01-01

    The authors present an algorithmic approach to determining when the marking of a LSMG (live safe marked graph) or a LSFC (live safe free choice) net is in the set of live safe markings M. Hence, once the marking of a net is determined to be in M, then if at some time thereafter the marking of this net is determined not to be in M, this indicates a fault. It is shown how linear programming can be used to determine if m is an element of M. The worst-case computational complexity of each algorithm is bounded by the number of linear programs necessary to compute.

  10. Effectiveness of interim remedial actions at a radioactive waste facility

    International Nuclear Information System (INIS)

    Devgun, J.S.; Beskid, N.J.; Peterson, J.M.; Seay, W.M.; McNamee, E.

    1989-01-01

    Over the past eight years, several interim remedial actions have been taken at the Niagara Falls Storage Site (NFSS), primarily to reduce radon and gamma radiation exposures and to consolidate radioactive waste into a waste containment facility. Interim remedial actions have included capping of vents, sealing of pipes, relocation of the perimeter fence (to limit radon risk), transfer and consolidation of waste, upgrading of storage buildings, construction of a clay cutoff wall (to limit the potential groundwater transport of contaminants), treatment and release of contaminated water, interim use of a synthetic liner, and emplacement of an interim clay cap. An interim waste containment facility was completed in 1986. 6 refs., 3 figs

  11. System and method for motor fault detection using stator current noise cancellation

    Science.gov (United States)

    Zhou, Wei; Lu, Bin; Nowak, Michael P.; Dimino, Steven A.

    2010-12-07

    A system and method for detecting incipient mechanical motor faults by way of current noise cancellation is disclosed. The system includes a controller configured to detect indicia of incipient mechanical motor faults. The controller further includes a processor programmed to receive a baseline set of current data from an operating motor and define a noise component in the baseline set of current data. The processor is also programmed to acquire at least on additional set of real-time operating current data from the motor during operation, redefine the noise component present in each additional set of real-time operating current data, and remove the noise component from the operating current data in real-time to isolate any fault components present in the operating current data. The processor is then programmed to generate a fault index for the operating current data based on any isolated fault components.

  12. Fault morphology of the lyo Fault, the Median Tectonic Line Active Fault System

    OpenAIRE

    後藤, 秀昭

    1996-01-01

    In this paper, we investigated the various fault features of the lyo fault and depicted fault lines or detailed topographic map. The results of this paper are summarized as follows; 1) Distinct evidence of the right-lateral movement is continuously discernible along the lyo fault. 2) Active fault traces are remarkably linear suggesting that the angle of fault plane is high. 3) The lyo fault can be divided into four segments by jogs between left-stepping traces. 4) The mean slip rate is 1.3 ~ ...

  13. Elder Abuse Demonstration Project. Third Interim Report to the Illinois General Assembly on Public Acts 83-1259 and 83-1432.

    Science.gov (United States)

    Illinois State Dept. on Aging, Springfield.

    This document contains the third annual interim report of the Illinois Elder Abuse Demonstration Program. It discusses the overall intent of the demonstration program, trends and changes in the third year of the demonstration program compared with the results from the first two years of the program, and achievements and recommendations for a…

  14. High level organizing principles for display of systems fault information for commercial flight crews

    Science.gov (United States)

    Rogers, William H.; Schutte, Paul C.

    1993-01-01

    Advanced fault management aiding concepts for commercial pilots are being developed in a research program at NASA Langley Research Center. One aim of this program is to re-evaluate current design principles for display of fault information to the flight crew: (1) from a cognitive engineering perspective and (2) in light of the availability of new types of information generated by advanced fault management aids. The study described in this paper specifically addresses principles for organizing fault information for display to pilots based on their mental models of fault management.

  15. Reliability Centered Maintenance for Savannah River Site`s interim waste management facilities. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Hauer, K.A. [Westinghouse Savannah River Co., Aiken, SC (United States); Wilson, J.F. [PRC, Inc. (US)

    1992-06-01

    The application of Reliability Centered Maintenance (RCM) has been shown to be an effective means to optimize maintenance programs or to establish new programs. The key to success of any RCM program is to customize the methodology to meet the specific needs of the implementing organization. This paper discusses how RCM is being used to establish the preventive maintenance program and how the resulting system data is being used to support the Technical Baseline reconstitution effort for the interim Waste Management Division of Westinghouse Savannah River Company (WSRC).

  16. An impact analysis of the fault impedance on voltage sags

    Energy Technology Data Exchange (ETDEWEB)

    Ramos, Alessandro Candido Lopes [CELG - Companhia Energetica de Goias, Goiania, GO (Brazil). Generation and Transmission. System' s Operation Center], E-mail: alessandro.clr@celg.com.br; Batista, Adalberto Jose [Federal University of Goias (UFG), Goiania, GO (Brazil)], E-mail: batista@eee.ufg.br; Leborgne, Roberto Chouhy [Federal University of Rio Grande do Sul (UFRGS), Porto Alegre, RS (Brazil)], E-mail: rcl@ece.ufrgs.br; Emiliano, Pedro Henrique Mota, E-mail: ph@phph.com.br

    2009-07-01

    This paper presents an impact analysis of the fault impedance, in terms of its module and angle, on voltage sags caused by faults. Symmetrical and asymmetrical faults are simulated, at transmission and distribution lines, by using a frequency-domain fault simulation software called ANAFAS. Voltage sags are monitored at buses where sensitive end-users are connected. In order to overcome some intrinsic limitations of this software concerning its automatic execution for several cases, a computational tool was developed in Java programming language. This solution allows the automatic simulation of cases including the effect of the fault position, the fault type, and the proper fault impedance. The main conclusion is that the module and angle of the fault impedance can have a significant influence on voltage sag depending on the fault characteristics. (author)

  17. An Approach for Evaluating the Technical Quality of Interim Assessments

    Science.gov (United States)

    Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian

    2010-01-01

    Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…

  18. A computer-oriented approach to fault-tree construction. Topical report No. 1

    International Nuclear Information System (INIS)

    Chu, B.B.

    1976-11-01

    Fault Tree Analysis is one of the major tools for the safety and reliability analysis of large systems. A methodology for systematically constructing fault trees for general complex systems is developed and applied, via the computer program CAT, to several systems. First, a means of representing component behavior by decision tables is presented. In order to use these tables, a procedure for constructing and editing fault trees, either manually or by computer, is described. In order to verify the methodology the computer program CAT has been developed and used to construct fault trees for two systems

  19. National Ignition Facility Cryogenic Target Systems Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize the National Ignition Facility (NIF) Cryogenic Target Handling Systems (NCTS) Program, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NCTS. Preparation of a Program Execution Plan (PEP) for NCTS has been initiated, and a current draft is provided as Attachment 1 to this document. The National Ignition Facility is a multi-megajoule laser facility being constructed at Lawrence Livermore National Laboratory (LLNL) by the National Nuclear Security Administration (NNSA) in the Department of Energy (DOE). Its primary mission is to support the Stockpile Stewardship Program (SSP) by performing experiments studying weapons physics, including fusion ignition. NIF also supports the missions of weapons effects, inertial fusion energy, and basic science in high-energy-density physics. NIF will be operated by LLNL under contract to the University of California (UC) as a national user facility. NIF is a low-hazard, radiological facility, and its operation will meet all applicable federal, state, and local Environmental Safety and Health (ES and H) requirements. The NCTS Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope, cost, and schedule. The NIF Director controls the NIF Cryogenic Target Systems Interim Management Plan. Overall scope content and execution schedules for the High Energy Density Physics Campaign (SSP Campaign 10) are currently undergoing rebaselining and will be brought into alignment with resources expected to be available throughout the NNSA Future Years National Security Plan (FYNSP). The revised schedule for

  20. 75 FR 70083 - Emergency Forest Restoration Program and Emergency Conservation Program

    Science.gov (United States)

    2010-11-17

    ... Restoration Program and Emergency Conservation Program AGENCY: Farm Service Agency, USDA. ACTION: Interim rule. SUMMARY: The Farm Service Agency (FSA) is amending regulations as required by the Food, Conservation, and... as follows: PART 701--EMERGENCY CONSERVATION PROGRAM, EMERGENCY FOREST RESTORATION PROGRAM, AND...

  1. Disposal facility data for the interim performance

    International Nuclear Information System (INIS)

    Eiholzer, C.R.

    1995-01-01

    The purpose of this report is to identify and provide information on the waste package and disposal facility concepts to be used for the low-level waste tank interim performance assessment. Current concepts for the low-level waste form, canister, and the disposal facility will be used for the interim performance assessment. The concept for the waste form consists of vitrified glass cullet in a sulfur polymer cement matrix material. The waste form will be contained in a 2 x 2 x 8 meter carbon steel container. Two disposal facility concepts will be used for the interim performance assessment. These facility concepts are based on a preliminary disposal facility concept developed for estimating costs for a disposal options configuration study. These disposal concepts are based on vault type structures. None of the concepts given in this report have been approved by a Tank Waste Remediation Systems (TWRS) decision board. These concepts will only be used in th interim performance assessment. Future performance assessments will be based on approved designs

  2. Statistical Feature Extraction for Fault Locations in Nonintrusive Fault Detection of Low Voltage Distribution Systems

    Directory of Open Access Journals (Sweden)

    Hsueh-Hsien Chang

    2017-04-01

    Full Text Available This paper proposes statistical feature extraction methods combined with artificial intelligence (AI approaches for fault locations in non-intrusive single-line-to-ground fault (SLGF detection of low voltage distribution systems. The input features of the AI algorithms are extracted using statistical moment transformation for reducing the dimensions of the power signature inputs measured by using non-intrusive fault monitoring (NIFM techniques. The data required to develop the network are generated by simulating SLGF using the Electromagnetic Transient Program (EMTP in a test system. To enhance the identification accuracy, these features after normalization are given to AI algorithms for presenting and evaluating in this paper. Different AI techniques are then utilized to compare which identification algorithms are suitable to diagnose the SLGF for various power signatures in a NIFM system. The simulation results show that the proposed method is effective and can identify the fault locations by using non-intrusive monitoring techniques for low voltage distribution systems.

  3. Selected fault testing of electronic isolation devices used in nuclear power plant operation

    International Nuclear Information System (INIS)

    Villaran, M.; Hillman, K.; Taylor, J.; Lara, J.; Wilhelm, W.

    1994-05-01

    Electronic isolation devices are used in nuclear power plants to provide electrical separation between safety and non-safety circuits and systems. Major fault testing in an earlier program indicated that some energy may pass through an isolation device when a fault at the maximum credible potential is applied in the transverse mode to its output terminals. During subsequent field qualification testing of isolators, concerns were raised that the worst case fault, that is, the maximum credible fault (MCF), may not occur with a fault at the maximum credible potential, but rather at some lower potential. The present test program investigates whether problems can arise when fault levels up to the MCF potential are applied to the output terminals of an isolator. The fault energy passed through an isolated device during a fault was measured to determine whether the levels are great enough to potentially damage or degrade performance of equipment on the input (Class 1E) side of the isolator

  4. SALP-PC, a computer program for fault tree analysis on personal computers

    International Nuclear Information System (INIS)

    Contini, S.; Poucet, A.

    1987-01-01

    The paper presents the main characteristics of the SALP-PC computer code for fault tree analysis. The program has been developed in Fortran 77 on an Olivetti M24 personal computer (IBM compatible) in order to reach a high degree of portability. It is composed of six processors implementing the different phases of the analysis procedure. This particular structure presents some advantages like, for instance, the restart facility and the possibility to develop an event tree analysis code. The set of allowed logical operators, i.e. AND, OR, NOT, K/N, XOR, INH, together with the possibility to define boundary conditions, make the SALP-PC code a powerful tool for risk assessment. (orig.)

  5. The challenges facing the long term interim storage

    Energy Technology Data Exchange (ETDEWEB)

    Iracane, D. [CEA Sacaly, Dir. de la Simulation et des Outils Experimentaux-DSOE, 91 - Gif sur Yvette (France); Marvy, A. [CEA Saclay, Dir. du Developpement et de l' Innovation Nucleares-DDIN, 91 - Gif Sur Yvette (France)

    2001-07-01

    In France electricity generation by means of commercial nuclear power plants has come to a point where it contributes to the national demand at a level of 80%. The safety performance of the production system has also reached a high level of both maturity and reliability taking advantage of the cumulative effect of a 30 years long learning experience and ever more stringent safety requirements. The policy to reprocess spent fuel has been overriding but no final decision has yet been made regarding the ultimate disposition of the waste streams. Although studies on deep geological disposal are ongoing, France is also looking at whether and under which conditions a long-term interim storage may provide an effective flexibility to the fuel cycle back-end. We discuss thereafter the needs and the paramount objectives of this latter R and D program. Results are being framed as potential guiding criteria for decision makers and various stakeholders. In first part, we propose a general analysis which emphasises that a long term interim storage is more than a classical nuclear facility because it explicitly requires long-lasting control and creates a burden for Society during many generations. Then, in second part, we offer an overview of the technical results from the R and D program as they stand at the time of writing. As an answer to the Government request, a strong emphasis has been put on this research for three years. Conclusion is an attempt to outline the societal context in which future decisions will have to be made. (author)

  6. The challenges facing the long term interim storage

    International Nuclear Information System (INIS)

    Iracane, D.; Marvy, A.

    2001-01-01

    In France electricity generation by means of commercial nuclear power plants has come to a point where it contributes to the national demand at a level of 80%. The safety performance of the production system has also reached a high level of both maturity and reliability taking advantage of the cumulative effect of a 30 years long learning experience and ever more stringent safety requirements. The policy to reprocess spent fuel has been overriding but no final decision has yet been made regarding the ultimate disposition of the waste streams. Although studies on deep geological disposal are ongoing, France is also looking at whether and under which conditions a long-term interim storage may provide an effective flexibility to the fuel cycle back-end. We discuss thereafter the needs and the paramount objectives of this latter R and D program. Results are being framed as potential guiding criteria for decision makers and various stakeholders. In first part, we propose a general analysis which emphasises that a long term interim storage is more than a classical nuclear facility because it explicitly requires long-lasting control and creates a burden for Society during many generations. Then, in second part, we offer an overview of the technical results from the R and D program as they stand at the time of writing. As an answer to the Government request, a strong emphasis has been put on this research for three years. Conclusion is an attempt to outline the societal context in which future decisions will have to be made. (author)

  7. Fault tolerant control based on active fault diagnosis

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik

    2005-01-01

    An active fault diagnosis (AFD) method will be considered in this paper in connection with a Fault Tolerant Control (FTC) architecture based on the YJBK parameterization of all stabilizing controllers. The architecture consists of a fault diagnosis (FD) part and a controller reconfiguration (CR......) part. The FTC architecture can be applied for additive faults, parametric faults, and for system structural changes. Only parametric faults will be considered in this paper. The main focus in this paper is on the use of the new approach of active fault diagnosis in connection with FTC. The active fault...... diagnosis approach is based on including an auxiliary input in the system. A fault signature matrix is introduced in connection with AFD, given as the transfer function from the auxiliary input to the residual output. This can be considered as a generalization of the passive fault diagnosis case, where...

  8. Subsurface Interim Measures/Interim Remedial Action Plan/ Environmental Assessment and Decision Document, Operable Unit No. 2

    International Nuclear Information System (INIS)

    1992-01-01

    The subject Interim Measures/Interim Remedial Action plan/Environmental Assessment (IM/IRAP/EA) addresses residual free-phase volatile organic compound (VOC) contamination suspected in the subsurface within an area identified as Operable Unit No. 2 (OU2). This IM/IRAP/EA also addresses radionuclide contamination beneath the 903 Pad at OU2. Although subsurface VOC and radionuclide contamination on represent a source of OU2 ground-water contamination, they pose no immediate threat to public health or the environment. This volume contains five appendices

  9. Automatic test pattern generation for stuck-at and delay faults in combinational circuits

    International Nuclear Information System (INIS)

    Kim, Dae Sik

    1998-02-01

    The present studies are developed to propose the automatic test pattern generation (ATG) algorithms for combinational circuits. These ATG algorithms are realized in two ATG programs: One is the ATG program for stuck-at fault and the other one for delay faults. In order to accelerate the ATG process, these two ATG programs have a common feature (the search method based on the concept of the degree of freedom), whereas only ATG program for the delay fault utilizes the 19-valued logic, a type of composite valued logic. This difference between two ATG programs results from the difference of the target fault. Accelerating the ATG process is indispensable for improving the ATG algorithms. This acceleration is mainly achieved by reducing the number of the unnecessary backtrackings, making the earlier detection of the conflicts, and shortening the computation time between the implication. Because of this purpose, the developed ATG programs include the new search method based on the concept of the degree of freedom (DF). The DF concept, computed directly and easily from the system descriptions such as types of gates and their interconnections, is the criterion to decide which, among several alternate lines' logic values required along each path, promises to be the most effective in order to accelerate and improve the ATG process. This DF concept is utilized to develop and improve both of ATG programs for stuck-at and delay faults in combinational circuits. In addition to improving the ATG process, reducing number of test pattern is indispensable for testing the delay faults because the size of the delay faults grows rapidly as increasing the size of the circuit. In order to improve the compactness of the test set, 19-valued logic are derived. Unlike other TG logic systems, 19-valued logic is utilized to generate the robustly hazard-free test pattern. This is achieved by using the basic 5-valued logic, proposed in this work, where the transition with no hazard is

  10. CMM Interim Check Design of Experiments (U)

    Energy Technology Data Exchange (ETDEWEB)

    Montano, Joshua Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-07-29

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length and include a weekly interim check to reduce risk. The CMM interim check makes use of Renishaw’s Machine Checking Gauge which is an off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. As verification on the interim check process a design of experiments investigation was proposed to test a couple of key factors (location and inspector). The results from the two-factor factorial experiment proved that location influenced results more than the inspector or interaction.

  11. Permitting plan for the high-level waste interim storage

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1997-01-01

    This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist

  12. Row fault detection system

    Science.gov (United States)

    Archer, Charles Jens [Rochester, MN; Pinnow, Kurt Walter [Rochester, MN; Ratterman, Joseph D [Rochester, MN; Smith, Brian Edward [Rochester, MN

    2008-10-14

    An apparatus, program product and method checks for nodal faults in a row of nodes by causing each node in the row to concurrently communicate with its adjacent neighbor nodes in the row. The communications are analyzed to determine a presence of a faulty node or connection.

  13. Fault detection and isolation in systems with parametric faults

    DEFF Research Database (Denmark)

    Stoustrup, Jakob; Niemann, Hans Henrik

    1999-01-01

    The problem of fault detection and isolation of parametric faults is considered in this paper. A fault detection problem based on parametric faults are associated with internal parameter variations in the dynamical system. A fault detection and isolation method for parametric faults is formulated...

  14. On the fault system and basement structure in and around the epicentral region of the 1995 Hyogo-ken Nanbu earthquake; 1995 nen Hyogoken nanbu jishin shingen shuhen no danso kiso kozo ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    Yokokura, T; Kano, N; Yamaguchi, K; Miyazaki, T [Geological Survey of Japan, Tsukuba (Japan); Ikawa, T; Ota, Y; Kawanaka, T [Japex Jeoscience Institute, Tokyo (Japan)

    1996-05-01

    A reflection elastic wave seismic survey was carried out as part of the emergency survey of active faults in relation with the Hyogo-ken Nanbu Earthquake. This paper presents an interim report on the survey covering a wide area with deep structure as the survey object. The paper mentions that processing the survey data has been nearly completed, and is in the stage of making analyses and interpretations of the result of the processing, and that the survey was an attempt of making a unified survey over land areas, shallow sea areas, and seas by setting twelve traverse lines in and around the epicenter region. The paper also introduces briefly what has been found on hypocenters used, vibration receivers, vibration intervals, and CPD intervals, and on shapes of faults, particularly the continuity (the relationship of the Ashiya fault, Koyo fault and Osaka bay fault with the above two faults, branching of the Osaka bay fault, faults between the Wada promontory fault, Awaji Island and the Osaka bay fault, the fault off the east coast at the central part of Awaji Island, the Shichiku fault on the west coast of Awaji Island, and the basement fault). Mention is given also on the basement structure chart of the Osaka bay prepared preliminarily for the purpose of reference. 2 figs.

  15. Comparison of Cenozoic Faulting at the Savannah River Site to Fault Characteristics of the Atlantic Coast Fault Province: Implications for Fault Capability

    International Nuclear Information System (INIS)

    Cumbest, R.J.

    2000-01-01

    This study compares the faulting observed on the Savannah River Site and vicinity with the faults of the Atlantic Coastal Fault Province and concludes that both sets of faults exhibit the same general characteristics and are closely associated. Based on the strength of this association it is concluded that the faults observed on the Savannah River Site and vicinity are in fact part of the Atlantic Coastal Fault Province. Inclusion in this group means that the historical precedent established by decades of previous studies on the seismic hazard potential for the Atlantic Coastal Fault Province is relevant to faulting at the Savannah River Site. That is, since these faults are genetically related the conclusion of ''not capable'' reached in past evaluations applies.In addition, this study establishes a set of criteria by which individual faults may be evaluated in order to assess their inclusion in the Atlantic Coast Fault Province and the related association of the ''not capable'' conclusion

  16. Evaluation of ERA-Interim precipitation data in complex terrain

    Science.gov (United States)

    Gao, Lu; Bernhardt, Matthias; Schulz, Karsten

    2013-04-01

    Precipitation controls a large variety of environmental processes, which is an essential input parameter for land surface models e.g. in hydrology, ecology and climatology. However, rain gauge networks provides the necessary information, are commonly sparse in complex terrains, especially in high mountainous regions. Reanalysis products (e.g. ERA-40 and NCEP-NCAR) as surrogate data are increasing applied in the past years. Although they are improving forward, previous studies showed that these products should be objectively evaluated due to their various uncertainties. In this study, we evaluated the precipitation data from ERA-Interim, which is a latest reanalysis product developed by ECMWF. ERA-Interim daily total precipitation are compared with high resolution gridded observation dataset (E-OBS) at 0.25°×0.25° grids for the period 1979-2010 over central Alps (45.5-48°N, 6.25-11.5°E). Wet or dry day is defined using different threshold values (0.5mm, 1mm, 5mm, 10mm and 20mm). The correspondence ratio (CR) is applied for frequency comparison, which is the ratio of days when precipitation occurs in both ERA-Interim and E-OBS dataset. The result shows that ERA-Interim captures precipitation occurrence very well with a range of CR from 0.80 to 0.97 for 0.5mm to 20mm thresholds. However, the bias of intensity increases with rising thresholds. Mean absolute error (MAE) varies between 4.5 mm day-1 and 9.5 mm day-1 in wet days for whole area. In term of mean annual cycle, ERA-Interim almost has the same standard deviation of the interannual variability of daily precipitation with E-OBS, 1.0 mm day-1. Significant wet biases happened in ERA-Interim throughout warm season (May to August) and dry biases in cold season (November to February). The spatial distribution of mean annual daily precipitation shows that ERA-Interim significant underestimates precipitation intensity in high mountains and northern flank of Alpine chain from November to March while pronounced

  17. 12 CFR 541.18 - Interim Federal savings association.

    Science.gov (United States)

    2010-01-01

    ... an existing savings and loan holding company or to facilitate any other transaction the Office may... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim Federal savings association. 541.18... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.18 Interim Federal savings association. The term...

  18. Rapid Response Fault Drilling Past, Present, and Future

    Directory of Open Access Journals (Sweden)

    Demian M. Saffer

    2009-09-01

    Full Text Available New information about large earthquakes can be acquired by drilling into the fault zone quickly following a large seismic event. Specifically, we can learn about the levels of friction and strength of the fault which determine the dynamic rupture, monitor the healing process of the fault, record the stress changes that trigger aftershocks and capture important physical and chemical properties of the fault that control the rupture process. These scientific and associated technical issues were the focus of a three-day workshop on Rapid Response Fault Drilling: Past, Present, and Future, sponsored by the International Continental Scientific Drilling Program (ICDP and the Southern California Earthquake Center (SCEC. The meeting drewtogether forty-four scientists representing ten countries in Tokyo, Japan during November 2008. The group discussed the scientific problems and how they could be addressed through rapid response drilling. Focused talks presented previous work on drilling after large earthquakes and in fault zones in general, as well as the state of the art of experimental techniques and measurement strategies. Detailed discussion weighed the tradeoffs between rapid drilling andthe ability to satisfy a diverse range of scientific objectives. Plausible drilling sites and scenarios were evaluated. This is a shortened summary of the workshop report that discusses key scientific questions, measurement strategies, and recommendations. This report can provide a starting point for quickly mobilizing a drilling program following future large earthquakes. The full report can be seen at http://www.pmc.ucsc.edu/~rapid/.

  19. Computer-aided Fault Tree Analysis

    International Nuclear Information System (INIS)

    Willie, R.R.

    1978-08-01

    A computer-oriented methodology for deriving minimal cut and path set families associated with arbitrary fault trees is discussed first. Then the use of the Fault Tree Analysis Program (FTAP), an extensive FORTRAN computer package that implements the methodology is described. An input fault tree to FTAP may specify the system state as any logical function of subsystem or component state variables or complements of these variables. When fault tree logical relations involve complements of state variables, the analyst may instruct FTAP to produce a family of prime implicants, a generalization of the minimal cut set concept. FTAP can also identify certain subsystems associated with the tree as system modules and provide a collection of minimal cut set families that essentially expresses the state of the system as a function of these module state variables. Another FTAP feature allows a subfamily to be obtained when the family of minimal cut sets or prime implicants is too large to be found in its entirety; this subfamily consists only of sets that are interesting to the analyst in a special sense

  20. Systems analysis programs for hands-on integrated reliability evaluations (SAPHIRE) Version 5.0. Fault tree, event tree, and piping ampersand instrumentation diagram (FEP) editors reference manual: Volume 7

    International Nuclear Information System (INIS)

    McKay, M.K.; Skinner, N.L.; Wood, S.T.

    1994-07-01

    The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) refers to a set of several microcomputer programs that were developed to create and analyze probabilistic risk assessments (PRAs), primarily for nuclear power plants. The Fault Tree, Event Tree, and Piping and Instrumentation Diagram (FEP) editors allow the user to graphically build and edit fault trees, and event trees, and piping and instrumentation diagrams (P and IDs). The software is designed to enable the independent use of the graphical-based editors found in the Integrated Reliability and Risk Assessment System (IRRAS). FEP is comprised of three separate editors (Fault Tree, Event Tree, and Piping and Instrumentation Diagram) and a utility module. This reference manual provides a screen-by-screen guide of the entire FEP System

  1. Interim Service ISDN Satellite (ISIS) network model for advanced satellite designs and experiments

    Science.gov (United States)

    Pepin, Gerard R.; Hager, E. Paul

    1991-01-01

    The Interim Service Integrated Services Digital Network (ISDN) Satellite (ISIS) Network Model for Advanced Satellite Designs and Experiments describes a model suitable for discrete event simulations. A top-down model design uses the Advanced Communications Technology Satellite (ACTS) as its basis. The ISDN modeling abstractions are added to permit the determination and performance for the NASA Satellite Communications Research (SCAR) Program.

  2. Interim sanitary landfill groundwater monitoring report. 1996 Annual report

    International Nuclear Information System (INIS)

    Bagwell, L.A.

    1997-01-01

    Eight wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Interim Sanitary Landfill at the Savannah River Site. These wells are sampled semiannually to comply with the South Carolina Department of Health and Environmental Control Modified Municipal Solid Waste Permit 025500-1120 and as part of the SRS Groundwater Monitoring Program. Trichlorofluoromethane and 1,1,1-trichloroethane were elevated in one sidegradient well and one downgradient well during 1996. Zinc was elevated in three downgradient wells and also was detected in the associated laboratory blanks for two of those wells. Specific conductance was elevated in one background well and one sidegradient well. Barium and copper exceeded standards in one sidegradient well, and dichloromethane (a common laboratory contaminant) was elevated in another sidegradient well. Barium, copper, and dichloromethane were detected in the associated blanks for these wells, also. The groundwater flow direction in the Steed Pond Acquifer (Water Table) beneath the Interim Sanitary Landfill was to the southeast (universal transverse Mercator coordinates). The flow rate in this unit was approximately 210 ft/year during first quarter 1996 and 180 ft/yr during third quarter 1996

  3. [The Application of the Fault Tree Analysis Method in Medical Equipment Maintenance].

    Science.gov (United States)

    Liu, Hongbin

    2015-11-01

    In this paper, the traditional fault tree analysis method is presented, detailed instructions for its application characteristics in medical instrument maintenance is made. It is made significant changes when the traditional fault tree analysis method is introduced into the medical instrument maintenance: gave up the logic symbolic, logic analysis and calculation, gave up its complicated programs, and only keep its image and practical fault tree diagram, and the fault tree diagram there are also differences: the fault tree is no longer a logical tree but the thinking tree in troubleshooting, the definition of the fault tree's nodes is different, the composition of the fault tree's branches is also different.

  4. Cell boundary fault detection system

    Science.gov (United States)

    Archer, Charles Jens [Rochester, MN; Pinnow, Kurt Walter [Rochester, MN; Ratterman, Joseph D [Rochester, MN; Smith, Brian Edward [Rochester, MN

    2011-04-19

    An apparatus and program product determine a nodal fault along the boundary, or face, of a computing cell. Nodes on adjacent cell boundaries communicate with each other, and the communications are analyzed to determine if a node or connection is faulty.

  5. Adaptive Fault Tolerance for Many-Core Based Space-Borne Computing

    Science.gov (United States)

    James, Mark; Springer, Paul; Zima, Hans

    2010-01-01

    This paper describes an approach to providing software fault tolerance for future deep-space robotic NASA missions, which will require a high degree of autonomy supported by an enhanced on-board computational capability. Such systems have become possible as a result of the emerging many-core technology, which is expected to offer 1024-core chips by 2015. We discuss the challenges and opportunities of this new technology, focusing on introspection-based adaptive fault tolerance that takes into account the specific requirements of applications, guided by a fault model. Introspection supports runtime monitoring of the program execution with the goal of identifying, locating, and analyzing errors. Fault tolerance assertions for the introspection system can be provided by the user, domain-specific knowledge, or via the results of static or dynamic program analysis. This work is part of an on-going project at the Jet Propulsion Laboratory in Pasadena, California.

  6. 76 FR 52996 - Public Company Accounting Oversight Board; Order Approving Proposed Temporary Rule for an Interim...

    Science.gov (United States)

    2011-08-24

    ... Accounting Oversight Board; Order Approving Proposed Temporary Rule for an Interim Program of Inspection Related to Audits of Brokers and Dealers August 18, 2011. I. Introduction On June 21, 2011, the Public... that would be imposed on different categories of registered public accounting firms and classes of...

  7. Design review report FFTF interim storage cask

    International Nuclear Information System (INIS)

    Scott, P.L.

    1995-01-01

    Final Design Review Report for the FFTF Interim Storage Cask. The Interim Storage Cask (ISC) will be used for long term above ground dry storage of FFTF irradiated fuel in Core Component Containers (CCC)s. The CCC has been designed and will house assemblies that have been sodium washed in the IEM Cell. The Solid Waste Cask (SWC) will transfer a full CCC from the IEM Cell to the RSB Cask Loading Station where the ISC will be located to receive it. Once the loaded ISC has been sealed at the RSB Cask Loading Station, it will be transferred by facility crane to the DSWC Transporter. After the ISC has been transferred to the Interim Storage Area (ISA), which is yet to be designed, a mobile crane will be used to place the ISC in its final storage location

  8. Choosing a spent fuel interim storage system

    International Nuclear Information System (INIS)

    Roland, V.; Hunter, I.

    2001-01-01

    The Transnucleaire Group has developed different modular solutions to address spent fuel interim storage needs of NPP. These solutions, that are present in Europe, USA and Asia are metal casks (dual purpose or storage only) of the TN 24 family and the NUHOMS canister based system. It is not always simple for an operator to sort out relevant choice criteria. After explaining the basic designs involved on the examples of the TN 120 WWER dual purpose cask and the NUHOMS 56 WWER for WWER 440 spent fuel, we shall discuss the criteria that govern the choice of a given spent fuel interim storage system from the stand point of the operator. In conclusion, choosing and implementing an interim storage system is a complex process, whose implications can be far reaching for the long-term success of a spent fuel management policy. (author)

  9. From fault classification to fault tolerance for multi-agent systems

    CERN Document Server

    Potiron, Katia; Taillibert, Patrick

    2013-01-01

    Faults are a concern for Multi-Agent Systems (MAS) designers, especially if the MAS are built for industrial or military use because there must be some guarantee of dependability. Some fault classification exists for classical systems, and is used to define faults. When dependability is at stake, such fault classification may be used from the beginning of the system's conception to define fault classes and specify which types of faults are expected. Thus, one may want to use fault classification for MAS; however, From Fault Classification to Fault Tolerance for Multi-Agent Systems argues that

  10. Summary: beyond fault trees to fault graphs

    International Nuclear Information System (INIS)

    Alesso, H.P.; Prassinos, P.; Smith, C.F.

    1984-09-01

    Fault Graphs are the natural evolutionary step over a traditional fault-tree model. A Fault Graph is a failure-oriented directed graph with logic connectives that allows cycles. We intentionally construct the Fault Graph to trace the piping and instrumentation drawing (P and ID) of the system, but with logical AND and OR conditions added. Then we evaluate the Fault Graph with computer codes based on graph-theoretic methods. Fault Graph computer codes are based on graph concepts, such as path set (a set of nodes traveled on a path from one node to another) and reachability (the complete set of all possible paths between any two nodes). These codes are used to find the cut-sets (any minimal set of component failures that will fail the system) and to evaluate the system reliability

  11. Extraction, -scrub, -strip test results from the interim salt disposition program macrobatch 10 tank 21H qualification samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-06-26

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 10 for the Interim Salt Disposition Program (ISDP). The Salt Batch 10 characterization results were previously reported.ii,iii An Extraction, -Scrub, -Strip (ESS) test was performed to determine cesium distribution ratios (D(Cs)) and cesium concentration in the strip effluent (SE) and decontaminated salt solution (DSS) streams; this data will be used by Tank Farm Engineering to project a cesium decontamination factor (DF). This test used actual Tank 21H material, and a sample of the NGS Blend solvent currently being used at the Modular Caustic-Side Solvent Extraction Unit (MCU). The ESS test showed acceptable performance with an extraction D(Cs) value of 110. This value is consistent with results from previous salt batch ESS tests using similar solvent formulations. This is better than the predicted value of 39.8 from a recently created D(Cs) model.

  12. Fault-related clay authigenesis along the Moab Fault: Implications for calculations of fault rock composition and mechanical and hydrologic fault zone properties

    Science.gov (United States)

    Solum, J.G.; Davatzes, N.C.; Lockner, D.A.

    2010-01-01

    The presence of clays in fault rocks influences both the mechanical and hydrologic properties of clay-bearing faults, and therefore it is critical to understand the origin of clays in fault rocks and their distributions is of great importance for defining fundamental properties of faults in the shallow crust. Field mapping shows that layers of clay gouge and shale smear are common along the Moab Fault, from exposures with throws ranging from 10 to ???1000 m. Elemental analyses of four locations along the Moab Fault show that fault rocks are enriched in clays at R191 and Bartlett Wash, but that this clay enrichment occurred at different times and was associated with different fluids. Fault rocks at Corral and Courthouse Canyons show little difference in elemental composition from adjacent protolith, suggesting that formation of fault rocks at those locations is governed by mechanical processes. Friction tests show that these authigenic clays result in fault zone weakening, and potentially influence the style of failure along the fault (seismogenic vs. aseismic) and potentially influence the amount of fluid loss associated with coseismic dilation. Scanning electron microscopy shows that authigenesis promotes that continuity of slip surfaces, thereby enhancing seal capacity. The occurrence of the authigenesis, and its influence on the sealing properties of faults, highlights the importance of determining the processes that control this phenomenon. ?? 2010 Elsevier Ltd.

  13. 47 CFR 51.715 - Interim transport and termination pricing.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim transport and termination pricing. 51.715 Section 51.715 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER... Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...

  14. Planetary Gearbox Fault Detection Using Vibration Separation Techniques

    Science.gov (United States)

    Lewicki, David G.; LaBerge, Kelsen E.; Ehinger, Ryan T.; Fetty, Jason

    2011-01-01

    Studies were performed to demonstrate the capability to detect planetary gear and bearing faults in helicopter main-rotor transmissions. The work supported the Operations Support and Sustainment (OSST) program with the U.S. Army Aviation Applied Technology Directorate (AATD) and Bell Helicopter Textron. Vibration data from the OH-58C planetary system were collected on a healthy transmission as well as with various seeded-fault components. Planetary fault detection algorithms were used with the collected data to evaluate fault detection effectiveness. Planet gear tooth cracks and spalls were detectable using the vibration separation techniques. Sun gear tooth cracks were not discernibly detectable from the vibration separation process. Sun gear tooth spall defects were detectable. Ring gear tooth cracks were only clearly detectable by accelerometers located near the crack location or directly across from the crack. Enveloping provided an effective method for planet bearing inner- and outer-race spalling fault detection.

  15. Colonie Interim Storage Site: Annual site environmental report, Colonie, New York, Calendar year 1986: Formerly Utilized Sites Remedial Action Program (FUSRAP)

    International Nuclear Information System (INIS)

    1987-06-01

    During 1986, the environmental monitoring program continued at the Colonie Interim Storage Site (CISS), a US Department of Energy (DOE) facility located in Colonie, New York. The CISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has mandated DOE to remedy. As part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Appropriations Act, remedial action is being conducted at the site and at vicinity properties by Bechtel National Inc. (BNI), Project Management Contractor for FUSRAP. The environmental monitoring program is also carried out by BNI. The monitoring program at the CISS measures external gamma radiation levels as well as uranium and radium-226 concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard and to assess the potential effect of the site on public health, the radiation dose was calculated for the maximally exposed individual. Based on the conservative scenario described in the report, the maximally exposed individual would receive an annual external exposure approximately equivalent to 5% of the DOE radiation protection standard of 100 mrem/y. Results of 1986 monitoring show that the CISS is in compliance with the DOE radiation protection standard. 14 refs., 9 figs., 9 tabs

  16. A knowledge-based approach to the evaluation of fault trees

    International Nuclear Information System (INIS)

    Hwang, Yann-Jong; Chow, Louis R.; Huang, Henry C.

    1996-01-01

    A list of critical components is useful for determining the potential problems of a complex system. However, to find this list through evaluating the fault trees is expensive and time consuming. This paper intends to propose an integrated software program which consists of a fault tree constructor, a knowledge base, and an efficient algorithm for evaluating minimal cut sets of a large fault tree. The proposed algorithm uses the approaches of top-down heuristic searching and the probability-based truncation. That makes the evaluation of fault trees obviously efficient and provides critical components for solving the potential problems in complex systems. Finally, some practical fault trees are included to illustrate the results

  17. A comparison of the value relevance of interim and annual financial statements

    Directory of Open Access Journals (Sweden)

    Mbalenhle Zulu

    2017-03-01

    Aim: It explores whether the value relevance of interim financial statements is higher than the value relevance of annual financial statements. Finally, it investigates whether accounting information published in interim and annual financial statements has incremental value relevance. Setting: Data for the period from 1999 to 2012 were collected from a sample of non-financial companies listed on the Johannesburg Stock Exchange. Method: The Ohlson model to investigate the value relevance of accounting information was used for the study. Results: The results show that interim book value of equity is value relevant while interim earnings are not. Interim financial statements appear to have higher value relevance than annual financial statements. The value relevance of interim and annual accounting information has remained fairly constant over the sample period. Incremental comparisons provide evidence that additional book value of equity and earnings that accrue to a company between interim and annual reporting dates are value relevant. Conclusion: The study was conducted over a long sample period (1999–2012, in an era when a technology-driven economy and more timely reporting media could have had an effect on the value relevance of published accounting information. To the best of our knowledge, this is the first study to evaluate and compare the value relevance of published interim and annual financial statements.

  18. Preliminary mapping of surficial geology of Midway Valley Yucca Mountain Project, Nye County, Nevada

    International Nuclear Information System (INIS)

    Wesling, J.R.; Bullard, T.F.; Swan, F.H.; Perman, R.C.; Angell, M.M.; Gibson, J.D.

    1992-04-01

    The tectonics program for the proposed high-level nuclear waste repository at Yucca Mountain in southwestern Nevada must evaluate the potential for surface faulting beneath the prospective surface facilities. To help meet this goal, Quaternary surficial mapping studies and photolineament analyses were conducted to provide data for evaluating the location, recency, and style of faulting with Midway Valley at the eastern base of Yucca Mountain, the preferred location of these surface facilities. This interim report presents the preliminary results of this work

  19. 75 FR 21506 - Magnet Schools Assistance Program

    Science.gov (United States)

    2010-04-26

    ... DEPARTMENT OF EDUCATION 34 CFR Part 280 RIN 1855-AA07 [Docket ID ED-2010-OII-0003] Magnet Schools Assistance Program AGENCY: Office of Innovation and Improvement, Department of Education. ACTION: Interim... in the Federal Register an interim final rule and requested comments on that rule for the Magnet...

  20. Induced Voltages Ratio-Based Algorithm for Fault Detection, and Faulted Phase and Winding Identification of a Three-Winding Power Transformer

    Directory of Open Access Journals (Sweden)

    Byung Eun Lee

    2014-09-01

    Full Text Available This paper proposes an algorithm for fault detection, faulted phase and winding identification of a three-winding power transformer based on the induced voltages in the electrical power system. The ratio of the induced voltages of the primary-secondary, primary-tertiary and secondary-tertiary windings is the same as the corresponding turns ratio during normal operating conditions, magnetic inrush, and over-excitation. It differs from the turns ratio during an internal fault. For a single phase and a three-phase power transformer with wye-connected windings, the induced voltages of each pair of windings are estimated. For a three-phase power transformer with delta-connected windings, the induced voltage differences are estimated to use the line currents, because the delta winding currents are practically unavailable. Six detectors are suggested for fault detection. An additional three detectors and a rule for faulted phase and winding identification are presented as well. The proposed algorithm can not only detect an internal fault, but also identify the faulted phase and winding of a three-winding power transformer. The various test results with Electromagnetic Transients Program (EMTP-generated data show that the proposed algorithm successfully discriminates internal faults from normal operating conditions including magnetic inrush and over-excitation. This paper concludes by implementing the algorithm into a prototype relay based on a digital signal processor.

  1. RAFT: a computer program for fault tree risk calculations

    International Nuclear Information System (INIS)

    Seybold, G.D.

    1977-11-01

    A description and user instructions are presented for RAFT, a FORTRAN computer code for calculation of a risk measure for fault tree cut sets. RAFT calculates release quantities and a risk measure based on the product of probability and release quantity for cut sets of fault trees modeling the accidental release of radioactive material from a nuclear fuel cycle facility. Cut sets and their probabilities are supplied as input to RAFT from an external fault tree analysis code. Using the total inventory available of radioactive material, along with release fractions for each event in a cut set, the release terms are calculated for each cut set. Each release term is multiplied by the cut set probability to yield the cut set risk measure. RAFT orders the dominant cut sets on the risk measure. The total risk measure of processed cut sets and their fractional contributions are supplied as output. Input options are available to eliminate redundant cut sets, apply threshold values on cut set probability and risk, and control the total number of cut sets output. Hash addressing is used to remove redundant cut sets from the analysis. Computer hardware and software restrictions are given along with a sample problem and cross-reference table of the code. Except for the use of file management utilities, RAFT is written exclusively in FORTRAN language and is operational on a Control Data, CYBER 74-18--series computer system. 4 figures

  2. Energy-Aware Synthesis of Fault-Tolerant Schedules for Real-Time Distributed Embedded Systems

    DEFF Research Database (Denmark)

    Poulsen, Kåre Harbo; Pop, Paul; Izosimov, Viacheslav

    2007-01-01

    This paper presents a design optimisation tool for distributed embedded real-time systems that 1) decides mapping, fault-tolerance policy and generates a fault-tolerant schedule, 2) is targeted for hard real-time, 3) has hard reliability goal, 4) generates static schedule for processes and messages......, 5) provides fault-tolerance for k transient/soft faults, 6) optimises for minimal energy consumption, while considering impact of lowering voltages on the probability of faults, 7) uses constraint logic programming (CLP) based implementation....

  3. A novel method of fuzzy fault tree analysis combined with VB program to identify and assess the risk of coal dust explosions.

    Directory of Open Access Journals (Sweden)

    Hetang Wang

    Full Text Available Coal dust explosions (CDE are one of the main threats to the occupational safety of coal miners. Aiming to identify and assess the risk of CDE, this paper proposes a novel method of fuzzy fault tree analysis combined with the Visual Basic (VB program. In this methodology, various potential causes of the CDE are identified and a CDE fault tree is constructed. To overcome drawbacks from the lack of exact probability data for the basic events, fuzzy set theory is employed and the probability data of each basic event is treated as intuitionistic trapezoidal fuzzy numbers. In addition, a new approach for calculating the weighting of each expert is also introduced in this paper to reduce the error during the expert elicitation process. Specifically, an in-depth quantitative analysis of the fuzzy fault tree, such as the importance measure of the basic events and the cut sets, and the CDE occurrence probability is given to assess the explosion risk and acquire more details of the CDE. The VB program is applied to simplify the analysis process. A case study and analysis is provided to illustrate the effectiveness of this proposed method, and some suggestions are given to take preventive measures in advance and avoid CDE accidents.

  4. Fault tolerant control for uncertain systems with parametric faults

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Poulsen, Niels Kjølstad

    2006-01-01

    A fault tolerant control (FTC) architecture based on active fault diagnosis (AFD) and the YJBK (Youla, Jarb, Bongiorno and Kucera)parameterization is applied in this paper. Based on the FTC architecture, fault tolerant control of uncertain systems with slowly varying parametric faults...... is investigated. Conditions are given for closed-loop stability in case of false alarms or missing fault detection/isolation....

  5. LAMPF first-fault identifier for fast transient faults

    International Nuclear Information System (INIS)

    Swanson, A.R.; Hill, R.E.

    1979-01-01

    The LAMPF accelerator is presently producing 800-MeV proton beams at 0.5 mA average current. Machine protection for such a high-intensity accelerator requires a fast shutdown mechanism, which can turn off the beam within a few microseconds of the occurrence of a machine fault. The resulting beam unloading transients cause the rf systems to exceed control loop tolerances and consequently generate multiple fault indications for identification by the control computer. The problem is to isolate the primary fault or cause of beam shutdown while disregarding as many as 50 secondary fault indications that occur as a result of beam shutdown. The LAMPF First-Fault Identifier (FFI) for fast transient faults is operational and has proven capable of first-fault identification. The FFI design utilized features of the Fast Protection System that were previously implemented for beam chopping and rf power conservation. No software changes were required

  6. Pen Branch fault: Confirmatory drilling results

    International Nuclear Information System (INIS)

    Stieve, A.; Coruh, C.; Costain, J.K.

    1994-01-01

    The Confirmatory Drilling Project is the final investigation under the Pen Branch Fault Program initiated to determine the capability of the Pen Branch fault (PBF) to release seismic energy. This investigation focused on a small zone over the fault where previously collected seismic reflection data had indicated the fault deforms the subsurface at 150 msec (with reference to an 80 m reference datum). Eighteen drill holes, 2 to basement and the others to 300 ft, were arranged in a scatter pattern over the fault. To adequately define configuration of the layers deformed by the fault boreholes were spaced over a zone of 800 ft, north to south. The closely spaced data were to confirm or refute the existence of flat lying reflectors observed in seismic reflection data and to enable the authors to identify and correlate lithologic layers with seismic reflection data. Results suggest that deformation by the fault in sediments 300 ft deep ad shallower is subtle. Corroboration of the geologic interpretation with the seismic reflection profile is ongoing but preliminary results indicate that specific reflectors can be assigned to lithologic layers. A large amplitude package of reflections below a flat lying continuous reflection at 40 msec can be correlated with a lithology that corresponds to carbonate sediments in geologic cross-section. Further, data also show that a geologic layer as shallow as 30 ft can be traced on these seismic data over the same subsurface distance where geologic cross-section shows corresponding continuity. The subsurface structure is thus corroborated by both methods at this study site

  7. V&V of Fault Management: Challenges and Successes

    Science.gov (United States)

    Fesq, Lorraine M.; Costello, Ken; Ohi, Don; Lu, Tiffany; Newhouse, Marilyn

    2013-01-01

    This paper describes the results of a special breakout session of the NASA Independent Verification and Validation (IV&V) Workshop held in the fall of 2012 entitled "V&V of Fault Management: Challenges and Successes." The NASA IV&V Program is in a unique position to interact with projects across all of the NASA development domains. Using this unique opportunity, the IV&V program convened a breakout session to enable IV&V teams to share their challenges and successes with respect to the V&V of Fault Management (FM) architectures and software. The presentations and discussions provided practical examples of pitfalls encountered while performing V&V of FM including the lack of consistent designs for implementing faults monitors and the fact that FM information is not centralized but scattered among many diverse project artifacts. The discussions also solidified the need for an early commitment to developing FM in parallel with the spacecraft systems as well as clearly defining FM terminology within a project.

  8. Why the 2002 Denali fault rupture propagated onto the Totschunda fault: implications for fault branching and seismic hazards

    Science.gov (United States)

    Schwartz, David P.; Haeussler, Peter J.; Seitz, Gordon G.; Dawson, Timothy E.

    2012-01-01

    The propagation of the rupture of the Mw7.9 Denali fault earthquake from the central Denali fault onto the Totschunda fault has provided a basis for dynamic models of fault branching in which the angle of the regional or local prestress relative to the orientation of the main fault and branch plays a principal role in determining which fault branch is taken. GeoEarthScope LiDAR and paleoseismic data allow us to map the structure of the Denali-Totschunda fault intersection and evaluate controls of fault branching from a geological perspective. LiDAR data reveal the Denali-Totschunda fault intersection is structurally simple with the two faults directly connected. At the branch point, 227.2 km east of the 2002 epicenter, the 2002 rupture diverges southeast to become the Totschunda fault. We use paleoseismic data to propose that differences in the accumulated strain on each fault segment, which express differences in the elapsed time since the most recent event, was one important control of the branching direction. We suggest that data on event history, slip rate, paleo offsets, fault geometry and structure, and connectivity, especially on high slip rate-short recurrence interval faults, can be used to assess the likelihood of branching and its direction. Analysis of the Denali-Totschunda fault intersection has implications for evaluating the potential for a rupture to propagate across other types of fault intersections and for characterizing sources of future large earthquakes.

  9. Single-shell tank interim stabilization risk analysis

    International Nuclear Information System (INIS)

    Basche, A.D.

    1998-01-01

    The purpose of the Single-Shell Tank (SST) Interim Stabilization Risk Analysis is to provide a cost and schedule risk analysis of HNF-2358, Rev. 1, Single-Shell Tank Interim Stabilization Project Plan (Project Plan) (Ross et al. 1998). The analysis compares the required cost profile by fiscal year (Section 4.2) and revised schedule completion date (Section 4.5) to the Project Plan. The analysis also evaluates the executability of the Project Plan and recommends a path forward for risk mitigation

  10. TWRS HLW interim storage facility search and evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Calmus, R.B., Westinghouse Hanford

    1996-05-16

    The purpose of this study was to identify and provide an evaluation of interim storage facilities and potential facility locations for the vitrified high-level waste (HLW) from the Phase I demonstration plant and Phase II production plant. In addition, interim storage facilities for solidified separated radionuclides (Cesium and Technetium) generated during pretreatment of Phase I Low-Level Waste Vitrification Plant feed was evaluated.

  11. Interim report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1985-06-01

    This Interim Report summarizes the research and development activities of the Superconducting Super Collider project carried out from the completion of the Reference Designs Study (May 1984) to June 1985. It was prepared by the SSC Central Design Group in draft form on the occasion of the DOE Annual Review, June 19--21, 1985. Now largely organized by CDG Divisions, the bulk of each chapter documents the progress and accomplishments to date, while the final section(s) describe plans for future work. Chapter 1, Introduction, provides a basic brief description of the SSC, its physics justification, its origins, and the R&D organization set up to carry out the work. Chapter 2 gives a summary of the main results of the R&D program, the tasks assigned to the four magnet R&D centers, and an overview of the future plans. The reader wishing a quick look at the SSC Phase I effort can skim Chapter 1 and read Chapter 2. Subsequent chapters discuss in more detail the activities on accelerator physics, accelerator systems, magnets and cryostats, injector, detector R&D, conventional facilities, and project planning and management. The magnet chapter (5) documents in text and photographs the impressive progress in successful construction of many model magnets, the development of cryostats with low heat leaks, and the improvement in current-carrying capacity of superconducting strand. Chapter 9 contains the budgets and schedules of the COG Divisions, the overall R&D program, including the laboratories, and also preliminary projections for construction. Appendices provide information on the various panels, task forces and workshops held by the CDG in FY 1985, a bibliography of COG and Laboratory reports on SSC and SSC-related work, and on private industrial involvement in the project.

  12. No-fault vaccine insurance: lessons from the National Vaccine Injury Compensation Program.

    Science.gov (United States)

    Ridgway, D

    1999-02-01

    During the first eight years of the National Vaccine Injury Compensation Program (NVICP), 786 contested claims were resolved through published judicial opinions. The likelihood of compensation dependent in part on the closeness of the match between the described injury and a specified list of acknowledged untoward vaccine side effects. In addition, the chances of applicant success were influenced by the applicant's choice of attorney and expert witnesses, by the assignment of the Special Master to decide the case, and increasingly over time, by the applicant's ability to comply with procedural requirements. The majority of contested claims arose from pertussis immunizations. For pertussis claims, the goal of insulating manufacturers from product liability suits has been achieved by granting compensation to applicants whose injuries are not scientifically recognized effects of the vaccine. In spite of (or because of) this jarring contradiction between the legal and medical understanding of causation, vaccine availability and childhood immunization rates improved during the early years of the plan. The apparent success of the program may encourage the substitution of no-fault compensation plans for tort-based consumer protection for other products, both medical and nonmedical.

  13. 78 FR 79567 - National School Lunch Program and School Breakfast Program: Nutrition Standards for All Foods...

    Science.gov (United States)

    2013-12-31

    ... Program: Nutrition Standards for All Foods Sold in Schools as Required by the Healthy, Hunger-Free Kids... interim rule entitled National School Lunch Program and School Breakfast Program: Nutrition Standards for..., 2013 / Rules and Regulations [[Page 79567

  14. Gaz de France interim financial report 2007

    International Nuclear Information System (INIS)

    2007-01-01

    This financial report contains the unaudited condensed financial statements of Gaz de France Group for the first half ended June 30, 2007, which were reviewed by the audit committee on August 27, 2007 and by the board of directors at its meeting on August 28, 2007. It includes forward-looking statements concerning the objectives, strategies, financial position, future operating results and the operations of Gaz de France Group. These statements reflect the Group's current perception of its activities and the markets in which it operates, as well as various estimates and assumptions considered to be reasonable. Content: interim management report (highlights of the first half of 2007, revenues and results for the period, financial structure, data on outstanding stock, outlook); interim consolidated financial statements (consolidated statements of income, consolidated balance sheets, consolidated statements of cash flows, recognized income and expenses, statements of changes in shareholders' equity, note to the consolidated financial statements); statement by the person responsible for the interim financial report; statutory auditors' report. (J.S.)

  15. Climate change : we are at risk : interim report

    International Nuclear Information System (INIS)

    Oliver, D.; Wiebe, J.

    2003-06-01

    Between November 2002 and May 2003 the Standing Senate Committee on Agriculture and Forestry travelled across Canada to hear the views of farmer organizations, rural associations, ecotourism groups and environmental organizations regarding concerns about climate change and the impact it may have on the agriculture and forestry sectors and rural communities. The Committee also examined potential adaptation strategies focusing on primary production, practices, technologies, ecosystems and other related areas. Farmers and forest operators are already facing changes in market conditions, domestic regulations, trade policies and technology. This interim report expressed the concerns of farmers and forest operators. It includes a review of the Saguenay flood of 1996, the Red River flood of 1997, the ice storm of 1998, and droughts since 1999. It also includes a discussion on climate change and its biophysical and economic effects on agriculture, forestry, water resources, rural communities, and Aboriginal communities. This interim report also briefly outlines the Kyoto Protocol, the emissions trading system, and the decarbonization of global energy systems. It emphasized the need for integrated research and government policies and programs that encourage adaptation to climate change. The final report will be released in October 2003 and will provide specific recommendations to ensure that Canada responds to the concerns of farmers and forest operators and to ensure continued prosperity in these sectors. refs., figs

  16. Climate change : we are at risk : interim report

    Energy Technology Data Exchange (ETDEWEB)

    Oliver, D.; Wiebe, J.

    2003-06-01

    Between November 2002 and May 2003 the Standing Senate Committee on Agriculture and Forestry travelled across Canada to hear the views of farmer organizations, rural associations, ecotourism groups and environmental organizations regarding concerns about climate change and the impact it may have on the agriculture and forestry sectors and rural communities. The Committee also examined potential adaptation strategies focusing on primary production, practices, technologies, ecosystems and other related areas. Farmers and forest operators are already facing changes in market conditions, domestic regulations, trade policies and technology. This interim report expressed the concerns of farmers and forest operators. It includes a review of the Saguenay flood of 1996, the Red River flood of 1997, the ice storm of 1998, and droughts since 1999. It also includes a discussion on climate change and its biophysical and economic effects on agriculture, forestry, water resources, rural communities, and Aboriginal communities. This interim report also briefly outlines the Kyoto Protocol, the emissions trading system, and the decarbonization of global energy systems. It emphasized the need for integrated research and government policies and programs that encourage adaptation to climate change. The final report will be released in October 2003 and will provide specific recommendations to ensure that Canada responds to the concerns of farmers and forest operators and to ensure continued prosperity in these sectors. refs., figs.

  17. Collection and analysis of existing information on applicability of investigation methods for estimation of beginning age of faulting in present faulting pattern

    International Nuclear Information System (INIS)

    Doke, Ryosuke; Yasue, Ken-ichi; Tanikawa, Shin-ichi; Nakayasu, Akio; Niizato, Tadafumi; Tanaka, Takenobu; Aoki, Michinori; Sekiya, Ayako

    2011-12-01

    In the field of R and D programs of a geological disposal of high level radioactive waste, it is great importance to develop a set of investigation and analysis techniques for the assessment of long-term geosphere stability over a geological time, which means that any changes of geological environment will not significantly impact on the long-term safety of a geological disposal system. In Japanese archipelago, crustal movements are so active that uplift and subsidence are remarkable in recent several hundreds of thousands of years. Therefore, it is necessary to assess the long-term geosphere stability taking into account a topographic change caused by crustal movements. One of the factors for the topographic change is the movement of an active fault, which is a geological process to release a strain accumulated by plate motion. A beginning age of the faulting in the present faulting pattern suggests the beginning age of neotectonic activities around the active fault, and also provides basic information to identifying the stage of a geomorphic development of mountains. Therefore, the age of faulting in the present faulting pattern is important information to estimate a topographic change in the future on the mountain regions of Japan. In this study, existing information related to methods for the estimation of the beginning age of the faulting in the present faulting pattern on the active fault were collected and reviewed. A principle of method, noticing points and technical know-hows in the application of the methods, data uncertainty, and so on were extracted from the existing information. Based on these extracted information, task-flows indicating working process on the estimation of the beginning age for the faulting of the active fault were illustrated on each method. Additionally, the distribution map of the beginning age with accuracy of faulting in the present faulting pattern on the active fault was illustrated. (author)

  18. Fire Hazards Analysis for the 200 Area Interim Storage Area

    International Nuclear Information System (INIS)

    JOHNSON, D.M.

    2000-01-01

    This documents the Fire Hazards Analysis (FHA) for the 200 Area Interim Storage Area. The Interim Storage Cask, Rad-Vault, and NAC-1 Cask are analyzed for fire hazards and the 200 Area Interim Storage Area is assessed according to HNF-PRO-350 and the objectives of DOE Order 5480 7A. This FHA addresses the potential fire hazards associated with the Interim Storage Area (ISA) facility in accordance with the requirements of DOE Order 5480 7A. It is intended to assess the risk from fire to ensure there are no undue fire hazards to site personnel and the public and to ensure property damage potential from fire is within acceptable limits. This FHA will be in the form of a graded approach commensurate with the complexity of the structure or area and the associated fire hazards

  19. Adaptive Control Allocation for Fault Tolerant Overactuated Autonomous Vehicles

    Science.gov (United States)

    2007-11-01

    Tolerant Overactuated Autonomous Vehicles Casavola, A.; Garone, E. (2007) Adaptive Control Allocation for Fault Tolerant Overactuated Autonomous ...Adaptive Control Allocation for Fault Tolerant Overactuated Autonomous Vehicles 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6...Tolerant Overactuated Autonomous Vehicles 3.2 - 2 RTO-MP-AVT-145 UNCLASSIFIED/UNLIMITED Control allocation problem (CAP) - Given a virtual input v(t

  20. Application of ant colony optimization in NPP classification fault location

    International Nuclear Information System (INIS)

    Xie Chunli; Liu Yongkuo; Xia Hong

    2009-01-01

    Nuclear Power Plant is a highly complex structural system with high safety requirements. Fault location appears to be particularly important to enhance its safety. Ant Colony Optimization is a new type of optimization algorithm, which is used in the fault location and classification of nuclear power plants in this paper. Taking the main coolant system of the first loop as the study object, using VB6.0 programming technology, the NPP fault location system is designed, and is tested against the related data in the literature. Test results show that the ant colony optimization can be used in the accurate classification fault location in the nuclear power plants. (authors)

  1. Colonie Interim Storage Site environmental report for calendar year 1992, 1130 Central Avenue, Colonie, New York. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    This report describes the environmental surveillance program at the Colonie Interim Storage Site (CISS) and provides the results for 1992. The site is located in eastern New York State, approximately 6.4 km (4.0 mi) northwest of downtown Albany. From 1958 to 1984, National Lead (NL) Industries used the facility to manufacture various components from depleted and enriched uranium natural thorium. Environmental monitoring of CISS began in 1984 when Congress added, the site to the US Department of Energy`s (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a program established to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental surveillance program at CISS includes sampling networks for external gamma radiation exposure and for thorium-232 and total uranium concentrations in surface water, sediment, and groundwater. Several chemical parameters are also measured in groundwater, including total metals, volatile organics, and water quality parameters. This surveillance program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Results are compared with applicable Environmental Protection Agency (EPA) and New York State Department of Environmental Conservation (NYSDEC) standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements.

  2. Use of alternative dispute resolution--HHS. Notice of interim policy.

    Science.gov (United States)

    1992-10-27

    The Department has developed an interim policy to address the use of alternative dispute resolution (ADR) as required by the Administrative Dispute Resolution Act (ADR Act), Public Law No. 101-552. This interim policy also responds to the Negotiated Rulemaking Act, Public Law No. 101-648, and relevant elements of the Executive Order on Civil Justice Reform (E.O. 12778). The Department is adopting an interim policy because we need a baseline of experience and knowledge from our own pilot activities and those of other agencies before finalizing a policy.

  3. 50 CFR 660.720 - Interim protection for sea turtles.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 9 2010-10-01 2010-10-01 false Interim protection for sea turtles. 660.720 Section 660.720 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707...

  4. Interim report and accounts 1993/94

    International Nuclear Information System (INIS)

    1993-01-01

    An interim set of accounts and reports is presented here for 1993/1994 for the health science company Amersham International. The company's research programs focus on developments in life science research, nuclear medicine and industrial quality and safety assurance, with particular expertise in the application of radioactivity to labelling and detection at the molecular level. This report which covers the half-year to 30 September 1993 shows promising financial results, with turnover, operating profits and earnings per share all having risen. All life science markets report growth although difficult trading conditions are being reported in Europe. Two products in the Healthcare business have achieved progress, a pain palliation agent for bone metastases has been launched in the United States, and European approval has been gained for a new technetium based heart imaging agent. Further growth is expected for the company. (UK)

  5. From experiment to design -- Fault characterization and detection in parallel computer systems using computational accelerators

    Science.gov (United States)

    Yim, Keun Soo

    This dissertation summarizes experimental validation and co-design studies conducted to optimize the fault detection capabilities and overheads in hybrid computer systems (e.g., using CPUs and Graphics Processing Units, or GPUs), and consequently to improve the scalability of parallel computer systems using computational accelerators. The experimental validation studies were conducted to help us understand the failure characteristics of CPU-GPU hybrid computer systems under various types of hardware faults. The main characterization targets were faults that are difficult to detect and/or recover from, e.g., faults that cause long latency failures (Ch. 3), faults in dynamically allocated resources (Ch. 4), faults in GPUs (Ch. 5), faults in MPI programs (Ch. 6), and microarchitecture-level faults with specific timing features (Ch. 7). The co-design studies were based on the characterization results. One of the co-designed systems has a set of source-to-source translators that customize and strategically place error detectors in the source code of target GPU programs (Ch. 5). Another co-designed system uses an extension card to learn the normal behavioral and semantic execution patterns of message-passing processes executing on CPUs, and to detect abnormal behaviors of those parallel processes (Ch. 6). The third co-designed system is a co-processor that has a set of new instructions in order to support software-implemented fault detection techniques (Ch. 7). The work described in this dissertation gains more importance because heterogeneous processors have become an essential component of state-of-the-art supercomputers. GPUs were used in three of the five fastest supercomputers that were operating in 2011. Our work included comprehensive fault characterization studies in CPU-GPU hybrid computers. In CPUs, we monitored the target systems for a long period of time after injecting faults (a temporally comprehensive experiment), and injected faults into various types of

  6. Novel neural networks-based fault tolerant control scheme with fault alarm.

    Science.gov (United States)

    Shen, Qikun; Jiang, Bin; Shi, Peng; Lim, Cheng-Chew

    2014-11-01

    In this paper, the problem of adaptive active fault-tolerant control for a class of nonlinear systems with unknown actuator fault is investigated. The actuator fault is assumed to have no traditional affine appearance of the system state variables and control input. The useful property of the basis function of the radial basis function neural network (NN), which will be used in the design of the fault tolerant controller, is explored. Based on the analysis of the design of normal and passive fault tolerant controllers, by using the implicit function theorem, a novel NN-based active fault-tolerant control scheme with fault alarm is proposed. Comparing with results in the literature, the fault-tolerant control scheme can minimize the time delay between fault occurrence and accommodation that is called the time delay due to fault diagnosis, and reduce the adverse effect on system performance. In addition, the FTC scheme has the advantages of a passive fault-tolerant control scheme as well as the traditional active fault-tolerant control scheme's properties. Furthermore, the fault-tolerant control scheme requires no additional fault detection and isolation model which is necessary in the traditional active fault-tolerant control scheme. Finally, simulation results are presented to demonstrate the efficiency of the developed techniques.

  7. CMM Interim Check (U)

    Energy Technology Data Exchange (ETDEWEB)

    Montano, Joshua Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-03-23

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length. Unfortunately, several nonconformance reports have been generated to document the discovery of a certified machine found out of tolerance during a calibration closeout. In an effort to reduce risk to product quality two solutions were proposed – shorten the calibration cycle which could be costly, or perform an interim check to monitor the machine’s performance between cycles. The CMM interim check discussed makes use of Renishaw’s Machine Checking Gauge. This off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. Data was gathered, analyzed, and simulated from seven machines in seventeen different configurations to create statistical process control run charts for on-the-floor monitoring.

  8. Fault tree handbook

    International Nuclear Information System (INIS)

    Haasl, D.F.; Roberts, N.H.; Vesely, W.E.; Goldberg, F.F.

    1981-01-01

    This handbook describes a methodology for reliability analysis of complex systems such as those which comprise the engineered safety features of nuclear power generating stations. After an initial overview of the available system analysis approaches, the handbook focuses on a description of the deductive method known as fault tree analysis. The following aspects of fault tree analysis are covered: basic concepts for fault tree analysis; basic elements of a fault tree; fault tree construction; probability, statistics, and Boolean algebra for the fault tree analyst; qualitative and quantitative fault tree evaluation techniques; and computer codes for fault tree evaluation. Also discussed are several example problems illustrating the basic concepts of fault tree construction and evaluation

  9. Interim process report for the safety assessment SR-Can

    International Nuclear Information System (INIS)

    Sellin, Patrick

    2004-08-01

    This report is a documentation of buffer processes identified as relevant to the long-term safety of a KBS-3 repository. The report is part of the interim reporting of the safety assessment SR-Can, see further the Interim main report. The final SR-Can reporting will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of this report is to document the scientific knowledge of the processes to a level required for an adequate treatment in the safety assessment. The documentation is thus from a scientific point of not exhaustive since such a treatment is neither necessary for the purposes of the safety assessment nor possible within the scope of an assessment. The purpose is further to determine the handling of each process in the safety assessment and to demonstrate how uncertainties are taken care of, given the suggested handling. The process documentation in the SR 97 version of the Process report is a starting point for this SR-Can interim version. As further described in the Interim main report, the list of relevant processes has been reviewed and slightly extended by comparison to other databases. Furthermore, the backfill has been included as a system part of its own, rather than being described together with the buffer as in SR 97. Apart from giving an interim account of the documentation and handling of buffer processes in SR-Can, this report is meant to serve as a template for the forthcoming documentation of processes occurring in other parts of the repository system. A complete list of processes can be found in the Interim FEP report for the safety assessment SR-Can. All material presented in this document is preliminary in nature and will possibly be updated as the SR-Can project progresses

  10. Interim process report for the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Sellin, Patrick (ed.)

    2004-08-01

    This report is a documentation of buffer processes identified as relevant to the long-term safety of a KBS-3 repository. The report is part of the interim reporting of the safety assessment SR-Can, see further the Interim main report. The final SR-Can reporting will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of this report is to document the scientific knowledge of the processes to a level required for an adequate treatment in the safety assessment. The documentation is thus from a scientific point of not exhaustive since such a treatment is neither necessary for the purposes of the safety assessment nor possible within the scope of an assessment. The purpose is further to determine the handling of each process in the safety assessment and to demonstrate how uncertainties are taken care of, given the suggested handling. The process documentation in the SR 97 version of the Process report is a starting point for this SR-Can interim version. As further described in the Interim main report, the list of relevant processes has been reviewed and slightly extended by comparison to other databases. Furthermore, the backfill has been included as a system part of its own, rather than being described together with the buffer as in SR 97. Apart from giving an interim account of the documentation and handling of buffer processes in SR-Can, this report is meant to serve as a template for the forthcoming documentation of processes occurring in other parts of the repository system. A complete list of processes can be found in the Interim FEP report for the safety assessment SR-Can. All material presented in this document is preliminary in nature and will possibly be updated as the SR-Can project progresses.

  11. Fault isolability conditions for linear systems with additive faults

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Stoustrup, Jakob

    2006-01-01

    In this paper, we shall show that an unlimited number of additive single faults can be isolated under mild conditions if a general isolation scheme is applied. Multiple faults are also covered. The approach is algebraic and is based on a set representation of faults, where all faults within a set...

  12. Fault diagnosis and fault-tolerant control based on adaptive control approach

    CERN Document Server

    Shen, Qikun; Shi, Peng

    2017-01-01

    This book provides recent theoretical developments in and practical applications of fault diagnosis and fault tolerant control for complex dynamical systems, including uncertain systems, linear and nonlinear systems. Combining adaptive control technique with other control methodologies, it investigates the problems of fault diagnosis and fault tolerant control for uncertain dynamic systems with or without time delay. As such, the book provides readers a solid understanding of fault diagnosis and fault tolerant control based on adaptive control technology. Given its depth and breadth, it is well suited for undergraduate and graduate courses on linear system theory, nonlinear system theory, fault diagnosis and fault tolerant control techniques. Further, it can be used as a reference source for academic research on fault diagnosis and fault tolerant control, and for postgraduates in the field of control theory and engineering. .

  13. A summary of the active fault investigation in the extension sea area of Kikugawa fault and the Nishiyama fault , N-S direction fault in south west Japan

    Science.gov (United States)

    Abe, S.

    2010-12-01

    In this study, we carried out two sets of active fault investigation by the request from Ministry of Education, Culture, Sports, Science and Technology in the sea area of the extension of Kikugawa fault and the Nishiyama fault. We want to clarify the five following matters about both active faults based on those results. (1)Fault continuity of the land and the sea. (2) The length of the active fault. (3) The division of the segment. (4) Activity characteristics. In this investigation, we carried out a digital single channel seismic reflection survey in the whole area of both active faults. In addition, a high-resolution multichannel seismic reflection survey was carried out to recognize the detailed structure of a shallow stratum. Furthermore, the sampling with the vibrocoring to get information of the sedimentation age was carried out. The reflection profile of both active faults was extremely clear. The characteristics of the lateral fault such as flower structure, the dispersion of the active fault were recognized. In addition, from analysis of the age of the stratum, it was recognized that the thickness of the sediment was extremely thin in Holocene epoch on the continental shelf in this sea area. It was confirmed that the Kikugawa fault extended to the offing than the existing results of research by a result of this investigation. In addition, the width of the active fault seems to become wide toward the offing while dispersing. At present, we think that we can divide Kikugawa fault into some segments based on the distribution form of the segment. About the Nishiyama fault, reflection profiles to show the existence of the active fault was acquired in the sea between Ooshima and Kyushu. From this result and topographical existing results of research in Ooshima, it is thought that Nishiyama fault and the Ooshima offing active fault are a series of structure. As for Ooshima offing active fault, the upheaval side changes, and a direction changes too. Therefore, we

  14. Technical know-how relevant to planning of borehole investigation for fault characterization

    Science.gov (United States)

    Mizuno, T.; Takeuchi, R.; Tsuruta, T.; Matsuoka, T.; Kunimaru, T.; Saegusa, H.

    2011-12-01

    As part of the national R&D program for geological disposal of high-level radioactive waste (HLW), the broad scientific study of the deep geological environment, JAEA has established the Mizunami Underground Research Laboratory (MIU) in Central Japan as a generic underground research laboratory (URL) facility. The MIU Project focuses on the crystalline rocks. In the case of fractured rock, a fault is one of the major discontinuity structures which control the groundwater flow conditions. It is important to estimate geological, hydrogeological, hydrochemical and rock mechanical characteristics of faults, and then to evaluate its role in the engineering design of repository and the assessment of long-term safety of HLW disposal. Therefore, investigations for fault characterization have been performed to estimate its characteristics and to evaluate existing conceptual and/or numerical models of the geological environment in the MIU project. Investigations related to faults have been conducted based on the conventional concept that a fault consists of a "fault core (FC)" characterized by distribution of the faulted rocks and a "fractured zone (FZ)" along FC. With the progress of investigations, furthermore, it is clear that there is also a case in which an "altered zone (AZ)" characterized by alteration of host rocks to clay minerals can be developed around the FC. Intensity of alteration in AZ generally decreases with distance from the FC, and AZ transits to FZ. Therefore, the investigation program focusing on properties of AZ is required for revising the existing conceptual and/or numerical models of geological environment. In this study, procedures for planning of fault characterizations have been summarized based on the technical know-how learnt through the MIU Project for the development of Knowledge Management System performed by JAEA under a contract with the Ministry of Economy, Trade and Industry as part of its R&D supporting program for developing geological

  15. Multi-directional fault detection system

    Science.gov (United States)

    Archer, Charles Jens [Rochester, MN; Pinnow, Kurt Walter [Rochester, MN; Ratterman, Joseph D [Rochester, MN; Smith, Brian Edward [Rochester, MN

    2009-03-17

    An apparatus, program product and method checks for nodal faults in a group of nodes comprising a center node and all adjacent nodes. The center node concurrently communicates with the immediately adjacent nodes in three dimensions. The communications are analyzed to determine a presence of a faulty node or connection.

  16. Multi-directional fault detection system

    Science.gov (United States)

    Archer, Charles Jens; Pinnow, Kurt Walter; Ratterman, Joseph D.; Smith, Brian Edward

    2010-06-29

    An apparatus, program product and method checks for nodal faults in a group of nodes comprising a center node and all adjacent nodes. The center node concurrently communicates with the immediately adjacent nodes in three dimensions. The communications are analyzed to determine a presence of a faulty node or connection.

  17. Fault finder

    Science.gov (United States)

    Bunch, Richard H.

    1986-01-01

    A fault finder for locating faults along a high voltage electrical transmission line. Real time monitoring of background noise and improved filtering of input signals is used to identify the occurrence of a fault. A fault is detected at both a master and remote unit spaced along the line. A master clock synchronizes operation of a similar clock at the remote unit. Both units include modulator and demodulator circuits for transmission of clock signals and data. All data is received at the master unit for processing to determine an accurate fault distance calculation.

  18. The Sorong Fault Zone, Indonesia: Mapping a Fault Zone Offshore

    Science.gov (United States)

    Melia, S.; Hall, R.

    2017-12-01

    The Sorong Fault Zone is a left-lateral strike-slip fault zone in eastern Indonesia, extending westwards from the Bird's Head peninsula of West Papua towards Sulawesi. It is the result of interactions between the Pacific, Caroline, Philippine Sea, and Australian Plates and much of it is offshore. Previous research on the fault zone has been limited by the low resolution of available data offshore, leading to debates over the extent, location, and timing of movements, and the tectonic evolution of eastern Indonesia. Different studies have shown it north of the Sula Islands, truncated south of Halmahera, continuing to Sulawesi, or splaying into a horsetail fan of smaller faults. Recently acquired high resolution multibeam bathymetry of the seafloor (with a resolution of 15-25 meters), and 2D seismic lines, provide the opportunity to trace the fault offshore. The position of different strands can be identified. On land, SRTM topography shows that in the northern Bird's Head the fault zone is characterised by closely spaced E-W trending faults. NW of the Bird's Head offshore there is a fold and thrust belt which terminates some strands. To the west of the Bird's Head offshore the fault zone diverges into multiple strands trending ENE-WSW. Regions of Riedel shearing are evident west of the Bird's Head, indicating sinistral strike-slip motion. Further west, the ENE-WSW trending faults turn to an E-W trend and there are at least three fault zones situated immediately south of Halmahera, north of the Sula Islands, and between the islands of Sanana and Mangole where the fault system terminates in horsetail strands. South of the Sula islands some former normal faults at the continent-ocean boundary with the North Banda Sea are being reactivated as strike-slip faults. The fault zone does not currently reach Sulawesi. The new fault map differs from previous interpretations concerning the location, age and significance of different parts of the Sorong Fault Zone. Kinematic

  19. Materials behavior in interim storage of spent fuel

    International Nuclear Information System (INIS)

    Johnson, A.B. Jr.; Bailey, W.J.; Gilbert, E.R.; Inman, S.C.

    1982-01-01

    Interim storage has emerged as the only current spent-fuel management method in the US and is essential in all countries with nuclear reactors. Materials behavior is a key aspect in licensing interim-storage facilities for several decades of spent-fuel storage. This paper reviews materials behavior in wet storage, which is licensed for light-water reactor (LWR) fuel, and dry storage, for which a licensing position for LWR fuel is developing

  20. Interim Safety Basis for Fuel Supply Shutdown Facility

    International Nuclear Information System (INIS)

    BENECKE, M.W.

    2000-01-01

    This ISB, in conjunction with the IOSR, provides the required basis for interim operation or restrictions on interim operations and administrative controls for the facility until a SAR is prepared in accordance with the new requirements or the facility is shut down. It is concluded that the risks associated with tha current and anticipated mode of the facility, uranium disposition, clean up, and transition activities required for permanent closure, are within risk guidelines

  1. 78 FR 49782 - Interim Staff Guidance on Changes During Construction

    Science.gov (United States)

    2013-08-15

    ... Construction AGENCY: Nuclear Regulatory Commission. ACTION: Draft interim staff guidance; request for comment... During Construction.'' This ISG provides guidance to the NRC staff on the Preliminary Amendment Request...-ISG-025 ``Interim Staff Guidance on Changes during Construction under 10 CFR Part 52'' is available...

  2. Wind turbine fault detection and fault tolerant control

    DEFF Research Database (Denmark)

    Odgaard, Peter Fogh; Johnson, Kathryn

    2013-01-01

    In this updated edition of a previous wind turbine fault detection and fault tolerant control challenge, we present a more sophisticated wind turbine model and updated fault scenarios to enhance the realism of the challenge and therefore the value of the solutions. This paper describes...

  3. Fault-weighted quantification method of fault detection coverage through fault mode and effect analysis in digital I&C systems

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Jaehyun; Lee, Seung Jun, E-mail: sjlee420@unist.ac.kr; Jung, Wondea

    2017-05-15

    Highlights: • We developed the fault-weighted quantification method of fault detection coverage. • The method has been applied to specific digital reactor protection system. • The unavailability of the module had 20-times difference with the traditional method. • Several experimental tests will be effectively prioritized using this method. - Abstract: The one of the most outstanding features of a digital I&C system is the use of a fault-tolerant technique. With an awareness regarding the importance of thequantification of fault detection coverage of fault-tolerant techniques, several researches related to the fault injection method were developed and employed to quantify a fault detection coverage. In the fault injection method, each injected fault has a different importance because the frequency of realization of every injected fault is different. However, there have been no previous studies addressing the importance and weighting factor of each injected fault. In this work, a new method for allocating the weighting to each injected fault using the failure mode and effect analysis data was proposed. For application, the fault-weighted quantification method has also been applied to specific digital reactor protection system to quantify the fault detection coverage. One of the major findings in an application was that we may estimate the unavailability of the specific module in digital I&C systems about 20-times smaller than real value when we use a traditional method. The other finding was that we can also classify the importance of the experimental case. Therefore, this method is expected to not only suggest an accurate quantification procedure of fault-detection coverage by weighting the injected faults, but to also contribute to an effective fault injection experiment by sorting the importance of the failure categories.

  4. Development of a Methodology for Hydrogeological Characterization of Faults: Progress of the Project in Berkeley, California

    Science.gov (United States)

    Goto, J.; Moriya, T.; Yoshimura, K.; Tsuchi, H.; Karasaki, K.; Onishi, T.; Ueta, K.; Tanaka, S.; Kiho, K.

    2010-12-01

    The Nuclear Waste Management Organization of Japan (NUMO), in collaboration with Lawrence Berkeley National Laboratory (LBNL), has carried out a project to develop an efficient and practical methodology to characterize hydrologic property of faults since 2007, exclusively for the early stage of siting a deep underground repository. A preliminary flowchart of the characterization program and a classification scheme of fault hydrology based on the geological feature have been proposed. These have been tested through the field characterization program on the Wildcat Fault in Berkeley, California. The Wildcat Fault is a relatively large non-active strike-slip fault which is believed to be a subsidiary of the active Hayward Fault. Our classification scheme assumes the contrasting hydrologic features between the linear northern part and the split/spread southern part of the Wildcat Fault. The field characterization program to date has been concentrated in and around the LBNL site on the southern part of the fault. Several lines of electrical and reflection seismic surveys, and subsequent trench investigations, have revealed the approximate distribution and near-surface features of the Wildcat Fault (see also Onishi, et al. and Ueta, et al.). Three 150m deep boreholes, WF-1 to WF-3, have been drilled on a line normal to the trace of the fault in the LBNL site. Two vertical holes were placed to characterize the undisturbed Miocene sedimentary formations at the eastern and western sides of the fault (WF-1 and WF-2 respectively). WF-2 on the western side intersected the rock formation, which was expected only in WF-1, and several of various intensities. Therefore, WF-3, originally planned as inclined to penetrate the fault, was replaced by the vertical hole further to the west. It again encountered unexpected rocks and faults. Preliminary results of in-situ hydraulic tests suggested that the transmissivity of WF-1 is ten to one hundred times higher than WF-2. The monitoring

  5. Spent fuel interim management: 1995 update

    International Nuclear Information System (INIS)

    Anderson, C.K.

    1995-01-01

    The problems of interim away-from-reactor spent fuel storage and storage in spent fuel pools at the reactor site are discussed. An overview of the state-of-the-art in the USA, Europe, and Japan is presented. The technical facilities for away-from-reactor storage are briefly described, including wet storage pools, interactive concrete systems, metallic containers, and passive concrete systems. Reprocessing technologies are mostly at the design stage only. It is predicted that during the 20 years to come, about 50 000 tonnes of spent fuel will be stored at reactor sites regardless of the advance of spent fuel reprocessing or interim storage projects. (J.B.). 4 tabs., 2 figs

  6. Detailed Geophysical Fault Characterization in Yucca Flat, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Theodore H. Asch; Donald Sweetkind; Bethany L. Burton; Erin L. Wallin

    2009-02-10

    Yucca Flat is a topographic and structural basin in the northeastern part of the Nevada Test Site (NTS) in Nye County, Nevada. Between the years 1951 and 1992, 659 underground nuclear tests took place in Yucca Flat; most were conducted in large, vertical excavations that penetrated alluvium and the underlying Cenozoic volcanic rocks. Radioactive and other potential chemical contaminants at the NTS are the subject of a long-term program of investigation and remediation by the U.S. Department of Energy (DOE), National Nuclear Security Administration, Nevada Site Office, under its Environmental Restoration Program. As part of the program, the DOE seeks to assess the extent of contamination and to evaluate the potential risks to humans and the environment from byproducts of weapons testing. To accomplish this objective, the DOE Environmental Restoration Program is constructing and calibrating a ground-water flow model to predict hydrologic flow in Yucca Flat as part of an effort to quantify the subsurface hydrology of the Nevada Test Site. A necessary part of calibrating and evaluating a model of the flow system is an understanding of the location and characteristics of faults that may influence ground-water flow. In addition, knowledge of fault-zone architecture and physical properties is a fundamental component of the containment of the contamination from underground nuclear tests, should such testing ever resume at the Nevada Test Site. The goal of the present investigation is to develop a detailed understanding of the geometry and physical properties of fault zones in Yucca Flat. This study was designed to investigate faults in greater detail and to characterize fault geometry, the presence of fault splays, and the fault-zone width. Integrated geological and geophysical studies have been designed and implemented to work toward this goal. This report describes the geophysical surveys conducted near two drill holes in Yucca Flat, the data analyses performed, and the

  7. A links manipulator simulation program interim report

    International Nuclear Information System (INIS)

    Noble, R.A.

    1987-04-01

    A computer program to simulate the performance of the Heysham II rail-following manipulator has been developed. The program is being used to develop and test the rail-following control algorithms which will be used to control movements of the manipulator when it is operating below the gas baffle dome. The simulation includes the dynamic responses of the manipulator joint drives, excluding friction, backlash and compliance. It also includes full details of the manipulator's geometry. A method is given whereby the actual manipulator dynamics can be written into the program once these have been established by measurement. The program is written in FORTRAN and runs on a Perkin-Elmer 3220 mini-computer. The simulation program responds to velocity demands on the individual joints. These will normally come from the control program, in which they will be manually controlled by a joystick. A sigma 5664 colour graphics generator is programmed to display the current position of the manipulator. (UK)

  8. General certification procedure of enterprises and interim job enterprises

    CERN Document Server

    Int. At. Energy Agency, Wien

    2002-01-01

    This procedure defines the certification global process of enterprises employing workers of A or B category for nuclear facilities and interim job enterprises proposing workers of A or B category for nuclear facilities. This certification proves the enterprises ability to satisfy the specification ''E'' of the CEFRI and the interim job enterprises to satisfy the specification ''I'' of the CEFRI. (A.L.B.)

  9. Discovery of amorphous carbon veins in the 2008 Wenchuan earthquake fault zone: implications for the fault weakening mechanism

    Science.gov (United States)

    Liu, J.; Zhang, J.; Zhang, B.; Li, H.

    2013-12-01

    The 2008 Wenchuan earthquake generated 270- and 80-km-long surface ruptures along Yingxiu-Beichuan fault and Guanxian-Anxian fault, respectively. At the outcrop near Hongkou village, southwest segment of Yingxiu-Beichuan rupture, network black amorphous carbon veins were discovered near fault planes in the 190-m-wide earthquake fault zone. These veins are mainly composed of ultrafine- and fine-grained amorphous carbon, usually narrower than 5mm and injected into faults and cracks as far as several meter. Flowage structures like asymmetrical structures around few stiff rock fragments indicate materials flew when the veins formed. Fluidization of cataclastic amorphous carbon and the powerful driving force in the veins imply high pore pressure built up during earthquakes. High pore pressure solution and graphite reported in the fault gouge (Togo et al., 2011) can lead very low dynamic friction during the Wenchuan earthquake. This deduction hypothesis is in accordance with the very low thermal abnormal measured on the principle fault zone following the Wenchuan earthquake (Mori et al., 2010). Furthermore, network amorphous carbon veins of different generations suggest similar weakening mechanism also worked on historical earthquakes in Longmenshan fault zone. Reference: Brodsky, E. E., Li, H., Mori, J. J., Kano, Y., and Xue, L., 2012, Frictional Stress Measured Through Temperature Profiles in the Wenchuan Scientific Fault Zone Drilling Project. American Geophysical Union, Fall Meeting. San Francisco, T44B-07 Li, H., Xu, Z., Si, J., Pei, J., Song, S., Sun, Z., and Chevalier, M., 2012, Wenchuan Earthquake Fault Scientific Drilling program (WFSD): Overview and Results. American Geophysical Union, Fall Meeting. San Francisco, T44B-01 Mori, J. J., Li, H., Wang, H., Kano, Y., Pei, J., Xu, Z., and Brodsky, E. E., 2010, Temperature measurements in the WFSD-1 borehole following the 2008 Wenchuan earthquake (MW7.9). American Geophysical Union, Fall Meeting. San Francisco, T53E

  10. Sample Results from the Interim Salt Disposition Program Macrobatch 8 Tank 21H Qualification Samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Washington, A. L. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-01-01

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 8 for the Interim Salt Disposition Program (ISDP). An Actinide Removal Process (ARP) and several Extraction-Scrub- Strip (ESS) tests were also performed. This document reports characterization data on the samples of Tank 21H as well as simulated performance of ARP and the Modular Caustic Side Solvent Extraction (CSSX) Unit (MCU). No issues with the projected Salt Batch 8 strategy are identified. A demonstration of the monosodium titanate (MST) (0.2 g/L) removal of strontium and actinides provided acceptable average decontamination factors for plutonium of 2.62 (4 hour) and 2.90 (8 hour); and average strontium decontamination factors of 21.7 (4 hour) and 21.3 (8 hour). These values are consistent with results from previous salt batch ARP tests. The two ESS tests also showed acceptable performance with extraction distribution ratios (D(Cs)) values of 52.5 and 50.4 for the Next Generation Solvent (NGS) blend (from MCU) and NGS (lab prepared), respectively. These values are consistent with results from previous salt batch ESS tests. Even though the performance is acceptable, SRNL recommends that a model for predicting extraction behavior for cesium removal for the blended solvent and NGS be developed in order to improve our predictive capabilities for the ESS tests.

  11. Sample results from the Interim Salt Disposition Program Macrobatch 8 Tank 21H qualification samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Washington, II, A. L. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2015-01-13

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 8 for the Interim Salt Disposition Program (ISDP). An Actinide Removal Process (ARP) and several Extraction-Scrub-Strip (ESS) tests were also performed. This document reports characterization data on the samples of Tank 21H as well as simulated performance of ARP and the Modular Caustic Side Solvent Extraction (CSSX) Unit (MCU). No issues with the projected Salt Batch 8 strategy are identified. A demonstration of the monosodium titanate (MST) (0.2 g/L) removal of strontium and actinides provided acceptable average decontamination factors for plutonium of 2.62 (4 hour) and 2.90 (8 hour); and average strontium decontamination factors of 21.7 (4 hour) and 21.3 (8 hour). These values are consistent with results from previous salt batch ARP tests. The two ESS tests also showed acceptable performance with extraction distribution ratios (D(Cs)) values of 52.5 and 50.4 for the Next Generation Solvent (NGS) blend (from MCU) and NGS (lab prepared), respectively. These values are consistent with results from previous salt batch ESS tests. Even though the performance is acceptable, SRNL recommends that a model for predicting extraction behavior for cesium removal for the blended solvent and NGS be developed in order to improve our predictive capabilities for the ESS tests.

  12. Interim salt disposition program macrobatch 6 tank 21H qualification monosodium titanate and cesium mass transfer tests

    Energy Technology Data Exchange (ETDEWEB)

    Washington, A. L. II; Peters, T. B.; Fink, S. D.

    2013-02-25

    Savannah River National Laboratory (SRNL) performed experiments on qualification material for use in the Interim Salt Disposition Program (ISDP) Batch 6 processing. This qualification material was a set of six samples from Tank 21H in October 2012. This sample was used as a real waste demonstration of the Actinide Removal Process (ARP) and the Extraction-Scrub-Strip (ESS) tests process. The Tank 21H sample was contacted with a reduced amount (0.2 g/L) of MST and characterized for strontium and actinide removal at 0 and 8 hour time intervals in this salt batch. {sup 237}Np and {sup 243}Am were both observed to be below detection limits in the source material, and so these results are not reported in this report. The plutonium and uranium samples had decontamination factor (DF) values that were on par or slightly better than we expected from Batch 5. The strontium DF values are slightly lower than expected but still in an acceptable range. The Extraction, Scrub, and Strip (ESS) testing demonstrated cesium removal, stripping and scrubbing within the acceptable range. Overall, the testing indicated that cesium removal is comparable to prior batches at MCU.

  13. ITER interim design report package and relevant documents

    International Nuclear Information System (INIS)

    1996-01-01

    This publication documents the technical basis which underlay the Interim Design Report, Cost Review and Safety Analysis submitted to the ITER Councils (IC-8 and IC-9) Records of decisions and the ''ITER Interim Design Report Package''. This publication contains ITER Site Requirements and ITER Site Design Assumptions, TAC-8 Report, SRG Report, CP's Report on Tentative Sequence of Events and Parties' Views on the IDR Package and Parties' Technical Comments on the IDR Package. Figs, tabs

  14. Presidential Transition: The Experience of Two Community College Interim Presidents

    Science.gov (United States)

    Thompson, Matthew D.

    2010-01-01

    The purpose of this qualitative case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this research study, 1. How do two interim community college presidents lead…

  15. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  16. Fast Flux Test Facility interim examination and maintenance cell: Past, present, and future

    International Nuclear Information System (INIS)

    Vincent, J.R.

    1990-09-01

    The Fast Flux Test Facility Interim Examination and Maintenance Cell was designed to perform interim examination and/or disassembly of experimental core components for final analysis elsewhere, as well as maintenance of sodium-wetted or neutron-activated internal reactor parts and plant support hardware. The Interim Examination and Maintenance Cell equipment developed and used for the first ten years of operation has been primarily devoted to the disassembly and examination of core component test assemblies. While no major reactor equipment has required remote repair or maintenance, the Interim Examina Examination and Maintenance Cell has served as the remote repair facility for its own in-cell equipment, and several innovative remote repairs have been accomplished. The Interim Examination and Maintenance Cell's demonstrated versatility has shown its capability to support a challenging future. 12 refs., 9 figs

  17. Analytical Approaches to Guide SLS Fault Management (FM) Development

    Science.gov (United States)

    Patterson, Jonathan D.

    2012-01-01

    Extensive analysis is needed to determine the right set of FM capabilities to provide the most coverage without significantly increasing the cost, reliability (FP/FN), and complexity of the overall vehicle systems. Strong collaboration with the stakeholders is required to support the determination of the best triggers and response options. The SLS Fault Management process has been documented in the Space Launch System Program (SLSP) Fault Management Plan (SLS-PLAN-085).

  18. Fault zone hydrogeology

    Science.gov (United States)

    Bense, V. F.; Gleeson, T.; Loveless, S. E.; Bour, O.; Scibek, J.

    2013-12-01

    Deformation along faults in the shallow crust (research effort of structural geologists and hydrogeologists. However, we find that these disciplines often use different methods with little interaction between them. In this review, we document the current multi-disciplinary understanding of fault zone hydrogeology. We discuss surface- and subsurface observations from diverse rock types from unlithified and lithified clastic sediments through to carbonate, crystalline, and volcanic rocks. For each rock type, we evaluate geological deformation mechanisms, hydrogeologic observations and conceptual models of fault zone hydrogeology. Outcrop observations indicate that fault zones commonly have a permeability structure suggesting they should act as complex conduit-barrier systems in which along-fault flow is encouraged and across-fault flow is impeded. Hydrogeological observations of fault zones reported in the literature show a broad qualitative agreement with outcrop-based conceptual models of fault zone hydrogeology. Nevertheless, the specific impact of a particular fault permeability structure on fault zone hydrogeology can only be assessed when the hydrogeological context of the fault zone is considered and not from outcrop observations alone. To gain a more integrated, comprehensive understanding of fault zone hydrogeology, we foresee numerous synergistic opportunities and challenges for the discipline of structural geology and hydrogeology to co-evolve and address remaining challenges by co-locating study areas, sharing approaches and fusing data, developing conceptual models from hydrogeologic data, numerical modeling, and training interdisciplinary scientists.

  19. Fault-tolerant control with mixed aerodynamic surfaces and RCS jets for hypersonic reentry vehicles

    Directory of Open Access Journals (Sweden)

    Jingjing He

    2017-04-01

    Full Text Available This paper proposes a fault-tolerant strategy for hypersonic reentry vehicles with mixed aerodynamic surfaces and reaction control systems (RCS under external disturbances and subject to actuator faults. Aerodynamic surfaces are treated as the primary actuator in normal situations, and they are driven by a continuous quadratic programming (QP allocator to generate torque commanded by a nonlinear adaptive feedback control law. When aerodynamic surfaces encounter faults, they may not be able to provide sufficient torque as commanded, and RCS jets are activated to augment the aerodynamic surfaces to compensate for insufficient torque. Partial loss of effectiveness and stuck faults are considered in this paper, and observers are designed to detect and identify the faults. Based on the fault identification results, an RCS control allocator using integer linear programming (ILP techniques is designed to determine the optimal combination of activated RCS jets. By treating the RCS control allocator as a quantization element, closed-loop stability with both continuous and quantized inputs is analyzed. Simulation results verify the effectiveness of the proposed method.

  20. Safety Consideration for a Wet Interim Spent Fuel Store at Conceptual Design Stage

    International Nuclear Information System (INIS)

    Astoux, Marion

    2014-01-01

    EDF Energy plans to build and operate two UK EPRs at the Hinkley Point C (HPC) site in Somerset, England. Spent fuel from the UK EPRs will need to be managed from the time it is discharged from the reactor until it is ultimately disposed of and this will involve storing the spent fuel for a period in the fuel building and thereafter in a dedicated interim facility until it can be emplaced within the UK Geological Disposal Facility. EDF Energy has proposed that this interim store should be located on the Hinkley Point site which is consistent with UK policy. This Interim Spent Fuel Store (ISFS) will have the capability to store for at least one hundred years the spent fuel arising from the operation of the two EPR units (sixty years operation). Therefore, specificities regarding the lifetime of the facility have to be accounted for its design. The choice of interim storage technology was considered in some depth for the HPC project and wet storage (pool) was selected. The facility is currently at conceptual design stage, although its construction will be part of main site construction phase. Safety functions and safety requirements for this storage facility have been defined, in compliance with WENRA 'Waste and Spent Fuel Storage - Safety Reference Level Report' and IAEA Specific Safety Guide no. 15 'Storage of Spent Nuclear Fuel'. EDF technical know-how, operational feedback on existing storage pools, UK regulatory context and Fukushima experience feedback have also been accounted for. Achievement of the safety functions as passively as reasonably practicable is a key issue for the design, especially in accident situations. Regarding lifetime aspects, ageing management of equipments, optimisation of the refurbishment, climate change, passivity of the facility, and long-term achievement of the safety functions are among the subjects to consider. Adequate Operational Limits and Conditions will also have to be defined, to enable the long-term achievement of the safety

  1. New York State interim waste management cost evaluation

    International Nuclear Information System (INIS)

    Ma, M.S.; Watts, R.J.; Jorgensen, J.R.; Rochester Gas and Electric Corp., NY)

    1985-01-01

    The purpose of this study is to investigate and quantify the comparative costs associated with including or excluding Class A utility wastes at a centralized interim waste management facility in New York State. The objective of the study is to assess the unit costs and total statewide costs associated with two distinct scenarios: (1) the case where non-utility Class A LLRW is received, incinerated and stored at the centralized interim facility, and utility Class A wastes are held without incineration at respective nuclear power plant interim onsite facilities without incineration; and (2) the alternative case where both utility and non-utility Class A wastes are accepted, incinerated and stored at the centralized facility. Unit costs to waste generators are estimated for each of the two cases described. This is followed by an estimation of the statewide cost impact to the public. The cost impact represents the cost differential resulting from the exclusion of utility Class A waste from the centralized NYS interim waste management facility. The principal factors comprising the cost differential include (1) higher unit disposal fees charged to non-utility waste generators, which are passed along in the costs of products and services; and (2) costs to utilities due to construction of additional onsite storage capacity, which in turn are charged to electric rate payers

  2. Interim long-term surveillance plan for the Cheney disposal site near, Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1997-08-01

    This interim long-term surveillance plan (LTSP) describes the U.S. Department of Energy's (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney Disposal Site in Mesa County near Grand Junction, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Cheney disposal site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP

  3. 216-T-4 interim stabilization final report

    International Nuclear Information System (INIS)

    Smith, D.L.

    1996-01-01

    This report provides a general description of the activities performed for the interim stabilization of the 216-T-4-1 ditch, 216-T-4-2 ditch, and 216-T-4-2 pond. Interim stabilization was required to reduce the amount of surface-contaminated acres and to minimize the migration of radioactive contamination. Work associated with the 216-T4-1 ditch and 216-T-4-2 pond was performed by the Radiation Area Remedial Action (RARA) Project. Work associated with the 216-T-4-2 ditch was done concurrently but was funded by Westinghouse Hanford Company (WHC) Tank Waste Remediation Systems (TWRS)

  4. Lessons for outsourcing and interim management relationships.

    Science.gov (United States)

    Macko, W; Kostyack, P T

    1999-01-01

    Few decisions can affect an organization more than the selection of an outsourcing or interim management partner. More and more health care organizations face such decisions in today's competitive market in order to face new business needs. Making these relationships successful can be important for health care organizations seeking competitive advantages or seeking immediately accessible management support. These relationships, however, require careful partner selection and development. Success in outsourcing and interim management relationships is contingent upon a thorough selection process, a strong contract that has clearly and explicitly detailed responsibilities and a culture-sensitive business rapport between the client and selected partner.

  5. PROJECT W-551 INTERIM PRETREATMENT SYSTEM PRECONCEPTUAL CANDIDATE TECHNOLOGY DESCRIPTIONS

    Energy Technology Data Exchange (ETDEWEB)

    MAY TH

    2008-08-12

    The Office of River Protection (ORP) has authorized a study to recommend and select options for interim pretreatment of tank waste and support Waste Treatment Plant (WTP) low activity waste (LAW) operations prior to startup of all the WTP facilities. The Interim Pretreatment System (IPS) is to be a moderately sized system which separates entrained solids and 137Cs from tank waste for an interim time period while WTP high level waste vitrification and pretreatment facilities are completed. This study's objective is to prepare pre-conceptual technology descriptions that expand the technical detail for selected solid and cesium separation technologies. This revision includes information on additional feed tanks.

  6. Do Interim Assessments Reduce the Race and SES Achievement Gaps?

    Science.gov (United States)

    Konstantopoulos, Spyros; Li, Wei; Miller, Shazia R.; van der Ploeg, Arie

    2017-01-01

    The authors examined differential effects of interim assessments on minority and low socioeconomic status students' achievement in Grades K-6. They conducted a large-scale cluster randomized experiment in 2009-2010 to evaluate the impact of Indiana's policy initiative introducing interim assessments statewide. The authors used 2-level models to…

  7. GOTRES: an expert system for fault detection and analysis

    International Nuclear Information System (INIS)

    Chung, D.T.; Modarres, M.

    1989-01-01

    This paper describes a deep-knowledge expert system shell for diagnosing faults in process operations. The expert program shell is called GOTRES (GOal TRee Expert System) and uses a goal tree-success tree deep-knowledge structure to model its knowledge-base. To demonstrate GOTRES, we have built an on-line fault diagnosis expert system for an experimental nuclear reactor facility using this shell. The expert system is capable of diagnosing fault conditions using system goal tree as well as utilizing accumulated operating knowledge to predict plant causal and temporal behaviours. The GOTRES shell has also been used for root-cause detection and analysis in a nuclear plant. (author)

  8. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1995-01-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites at the 100-HR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this operable unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that historically received radioactive liquid waste discharges that pose a potential threat to human health and the environment. This proposed plan is being issued by the Washington State Department of Ecology (Ecology), the lead regulatory agency; the US Environmental Protection Agency (EPA), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. Ecology, EPA, and DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Program.'' The proposed plan is intended to be a fact sheet for public review that (1) briefly describes the remedial alternatives analyzed; (2) proposes a preferred alternative; (3) summarizes the information relied upon to recommend the preferred alternative; and (4) provides a basis for an interim action record of decision (ROD). The preferred alternative presented in this proposed plan is removal, treatment (as appropriate), and disposal of contaminated soil and associated structures. Treatment will be conducted if there is cost benefit

  9. Imaging of Subsurface Faults using Refraction Migration with Fault Flooding

    KAUST Repository

    Metwally, Ahmed Mohsen Hassan

    2017-05-31

    We propose a novel method for imaging shallow faults by migration of transmitted refraction arrivals. The assumption is that there is a significant velocity contrast across the fault boundary that is underlain by a refracting interface. This procedure, denoted as refraction migration with fault flooding, largely overcomes the difficulty in imaging shallow faults with seismic surveys. Numerical results successfully validate this method on three synthetic examples and two field-data sets. The first field-data set is next to the Gulf of Aqaba and the second example is from a seismic profile recorded in Arizona. The faults detected by refraction migration in the Gulf of Aqaba data were in agreement with those indicated in a P-velocity tomogram. However, a new fault is detected at the end of the migration image that is not clearly seen in the traveltime tomogram. This result is similar to that for the Arizona data where the refraction image showed faults consistent with those seen in the P-velocity tomogram, except it also detected an antithetic fault at the end of the line. This fault cannot be clearly seen in the traveltime tomogram due to the limited ray coverage.

  10. Imaging of Subsurface Faults using Refraction Migration with Fault Flooding

    KAUST Repository

    Metwally, Ahmed Mohsen Hassan; Hanafy, Sherif; Guo, Bowen; Kosmicki, Maximillian Sunflower

    2017-01-01

    We propose a novel method for imaging shallow faults by migration of transmitted refraction arrivals. The assumption is that there is a significant velocity contrast across the fault boundary that is underlain by a refracting interface. This procedure, denoted as refraction migration with fault flooding, largely overcomes the difficulty in imaging shallow faults with seismic surveys. Numerical results successfully validate this method on three synthetic examples and two field-data sets. The first field-data set is next to the Gulf of Aqaba and the second example is from a seismic profile recorded in Arizona. The faults detected by refraction migration in the Gulf of Aqaba data were in agreement with those indicated in a P-velocity tomogram. However, a new fault is detected at the end of the migration image that is not clearly seen in the traveltime tomogram. This result is similar to that for the Arizona data where the refraction image showed faults consistent with those seen in the P-velocity tomogram, except it also detected an antithetic fault at the end of the line. This fault cannot be clearly seen in the traveltime tomogram due to the limited ray coverage.

  11. Interim Report by Asia International Grid Connection Study Group

    Science.gov (United States)

    Omatsu, Ryo

    2018-01-01

    The Asia International Grid Connection Study Group Interim Report examines the feasibility of developing an international grid connection in Japan. The Group has investigated different cases of grid connections in Europe and conducted research on electricity markets in Northeast Asia, and identifies the barriers and challenges for developing an international grid network including Japan. This presentation introduces basic contents of the interim report by the Study Group.

  12. Architecture of thrust faults with alongstrike variations in fault-plane dip: anatomy of the Lusatian Fault, Bohemian Massif

    Czech Academy of Sciences Publication Activity Database

    Coubal, Miroslav; Adamovič, Jiří; Málek, Jiří; Prouza, V.

    2014-01-01

    Roč. 59, č. 3 (2014), s. 183-208 ISSN 1802-6222 Institutional support: RVO:67985831 ; RVO:67985891 Keywords : fault architecture * fault plane geometry * drag structures * thrust fault * sandstone * Lusatian Fault Subject RIV: DB - Geology ; Mineralogy Impact factor: 1.405, year: 2014

  13. A System for Fault Management and Fault Consequences Analysis for NASA's Deep Space Habitat

    Science.gov (United States)

    Colombano, Silvano; Spirkovska, Liljana; Baskaran, Vijaykumar; Aaseng, Gordon; McCann, Robert S.; Ossenfort, John; Smith, Irene; Iverson, David L.; Schwabacher, Mark

    2013-01-01

    NASA's exploration program envisions the utilization of a Deep Space Habitat (DSH) for human exploration of the space environment in the vicinity of Mars and/or asteroids. Communication latencies with ground control of as long as 20+ minutes make it imperative that DSH operations be highly autonomous, as any telemetry-based detection of a systems problem on Earth could well occur too late to assist the crew with the problem. A DSH-based development program has been initiated to develop and test the automation technologies necessary to support highly autonomous DSH operations. One such technology is a fault management tool to support performance monitoring of vehicle systems operations and to assist with real-time decision making in connection with operational anomalies and failures. Toward that end, we are developing Advanced Caution and Warning System (ACAWS), a tool that combines dynamic and interactive graphical representations of spacecraft systems, systems modeling, automated diagnostic analysis and root cause identification, system and mission impact assessment, and mitigation procedure identification to help spacecraft operators (both flight controllers and crew) understand and respond to anomalies more effectively. In this paper, we describe four major architecture elements of ACAWS: Anomaly Detection, Fault Isolation, System Effects Analysis, and Graphic User Interface (GUI), and how these elements work in concert with each other and with other tools to provide fault management support to both the controllers and crew. We then describe recent evaluations and tests of ACAWS on the DSH testbed. The results of these tests support the feasibility and strength of our approach to failure management automation and enhanced operational autonomy

  14. Efficient reduction and modularization for large fault trees stored by pages

    International Nuclear Information System (INIS)

    Chen, Shanqi; Wang, Jin; Wang, Jiaqun; Wang, Fang; Hu, Liqin

    2016-01-01

    Highlights: • New fault tree pre-processing methods used in RiskA are presented. • Including the fault tree paging storage, simplification and modularization. • For getting MCS for fault trees containing more than 10,000 gates and events. • Reduce computer resources needs (RAM) and improve computation speed. - Abstract: Fault Tree Analysis (FTA), an indispensable tool used in Probabilistic Risk Assessment (PRA), has been used throughout the commercial nuclear power industry for safety and reliability analyses. However, large fault tree analysis, such as those used in nuclear power plant requires significant computer resources, which makes the analysis of PRA model inefficient and time consuming. This paper describes a fault tree pre-processing method used in the reliability and probabilistic safety assessment program RiskA that is capable of generating minimal cutsets for fault trees containing more than 10,000 gates and basic events. The novel feature of this method is not only that Boolean reduction rules are used but also that a new objective of simplification is proposed. Moreover, since the method aims to find more fault tree modules by the linear-time algorithm, it can optimize fault tree modularization, which further reduces the computational time of large fault tree analysis.

  15. Fault-tolerant cooperative output regulation for multi-vehicle systems with sensor faults

    Science.gov (United States)

    Qin, Liguo; He, Xiao; Zhou, D. H.

    2017-10-01

    This paper presents a unified framework of fault diagnosis and fault-tolerant cooperative output regulation (FTCOR) for a linear discrete-time multi-vehicle system with sensor faults. The FTCOR control law is designed through three steps. A cooperative output regulation (COR) controller is designed based on the internal mode principle when there are no sensor faults. A sufficient condition on the existence of the COR controller is given based on the discrete-time algebraic Riccati equation (DARE). Then, a decentralised fault diagnosis scheme is designed to cope with sensor faults occurring in followers. A residual generator is developed to detect sensor faults of each follower, and a bank of fault-matching estimators are proposed to isolate and estimate sensor faults of each follower. Unlike the current distributed fault diagnosis for multi-vehicle systems, the presented decentralised fault diagnosis scheme in each vehicle reduces the communication and computation load by only using the information of the vehicle. By combing the sensor fault estimation and the COR control law, an FTCOR controller is proposed. Finally, the simulation results demonstrate the effectiveness of the FTCOR controller.

  16. Robust Mpc for Actuator–Fault Tolerance Using Set–Based Passive Fault Detection and Active Fault Isolation

    Directory of Open Access Journals (Sweden)

    Xu Feng

    2017-03-01

    Full Text Available In this paper, a fault-tolerant control (FTC scheme is proposed for actuator faults, which is built upon tube-based model predictive control (MPC as well as set-based fault detection and isolation (FDI. In the class of MPC techniques, tubebased MPC can effectively deal with system constraints and uncertainties with relatively low computational complexity compared with other robust MPC techniques such as min-max MPC. Set-based FDI, generally considering the worst case of uncertainties, can robustly detect and isolate actuator faults. In the proposed FTC scheme, fault detection (FD is passive by using invariant sets, while fault isolation (FI is active by means of MPC and tubes. The active FI method proposed in this paper is implemented by making use of the constraint-handling ability of MPC to manipulate the bounds of inputs.

  17. NASA Spacecraft Fault Management Workshop Results

    Science.gov (United States)

    Newhouse, Marilyn; McDougal, John; Barley, Bryan; Fesq, Lorraine; Stephens, Karen

    2010-01-01

    Fault Management is a critical aspect of deep-space missions. For the purposes of this paper, fault management is defined as the ability of a system to detect, isolate, and mitigate events that impact, or have the potential to impact, nominal mission operations. The fault management capabilities are commonly distributed across flight and ground subsystems, impacting hardware, software, and mission operations designs. The National Aeronautics and Space Administration (NASA) Discovery & New Frontiers (D&NF) Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that 4 out of the 5 missions studied had significant overruns due to underestimating the complexity and support requirements for fault management. As a result of this and other recent experiences, the NASA Science Mission Directorate (SMD) Planetary Science Division (PSD) commissioned a workshop to bring together invited participants across government, industry, academia to assess the state of the art in fault management practice and research, identify current and potential issues, and make recommendations for addressing these issues. The workshop was held in New Orleans in April of 2008. The workshop concluded that fault management is not being limited by technology, but rather by a lack of emphasis and discipline in both the engineering and programmatic dimensions. Some of the areas cited in the findings include different, conflicting, and changing institutional goals and risk postures; unclear ownership of end-to-end fault management engineering; inadequate understanding of the impact of mission-level requirements on fault management complexity; and practices, processes, and

  18. Implementation plan for deployment of Federal Interim Storage facilities for commercial spent nuclear fuel

    International Nuclear Information System (INIS)

    1985-01-01

    This document is the second annual report on plans for providing Federal Interim Storage (FIS) capacity. References are made to the first annual report as necessary (DOE/RW-0003, 1984). Background factors and aspects that were considered in the development of this deployment plan and activities and interactions considered to be required to implement an FIS program are discussed. The generic approach that the Department plans to follow in deploying FIS facilities is also described

  19. The Interim Financial Reporting in the Spirit of the IAS 34 Norm

    OpenAIRE

    Ovidia Doinea

    2008-01-01

    The role of an interim financial reporting is to allow the information users to acknowledge the activity of an entity on period shorter than financial exercise from the perspective of the available profits and cash flows generated as well as from the point of view of its financial position and liquidity. The interim financial reporting includes a complete or condensed set of financial statements which target to update the last financial reporting, usually the annual report. The interim financ...

  20. Validation of Helicopter Gear Condition Indicators Using Seeded Fault Tests

    Science.gov (United States)

    Dempsey, Paula; Brandon, E. Bruce

    2013-01-01

    A "seeded fault test" in support of a rotorcraft condition based maintenance program (CBM), is an experiment in which a component is tested with a known fault while health monitoring data is collected. These tests are performed at operating conditions comparable to operating conditions the component would be exposed to while installed on the aircraft. Performance of seeded fault tests is one method used to provide evidence that a Health Usage Monitoring System (HUMS) can replace current maintenance practices required for aircraft airworthiness. Actual in-service experience of the HUMS detecting a component fault is another validation method. This paper will discuss a hybrid validation approach that combines in service-data with seeded fault tests. For this approach, existing in-service HUMS flight data from a naturally occurring component fault will be used to define a component seeded fault test. An example, using spiral bevel gears as the targeted component, will be presented. Since the U.S. Army has begun to develop standards for using seeded fault tests for HUMS validation, the hybrid approach will be mapped to the steps defined within their Aeronautical Design Standard Handbook for CBM. This paper will step through their defined processes, and identify additional steps that may be required when using component test rig fault tests to demonstrate helicopter CI performance. The discussion within this paper will provide the reader with a better appreciation for the challenges faced when defining a seeded fault test for HUMS validation.

  1. Comparisons of Cooperative and Non-Cooperative Students: An Analysis of Student Accounting System Data. Interim Report, June, 1981.

    Science.gov (United States)

    Frazier, Don

    The major purpose of this study was to identify unique effects of cooperative vocational education. This interim report is of results of the analyses of existing data bases. Comparisons of cooperative and non-cooperative vocational programs are made on the following variables: enrollments by age, sex and race, school status, work status,…

  2. Fault-Tolerant Approach for Modular Multilevel Converters under Submodule Faults

    DEFF Research Database (Denmark)

    Deng, Fujin; Tian, Yanjun; Zhu, Rongwu

    2016-01-01

    The modular multilevel converter (MMC) is attractive for medium- or high-power applications because of the advantages of its high modularity, availability, and high power quality. The fault-tolerant operation is one of the important issues for the MMC. This paper proposed a fault-tolerant approach...... for the MMC under submodule (SM) faults. The characteristic of the MMC with arms containing different number of healthy SMs under faults is analyzed. Based on the characteristic, the proposed approach can effectively keep the MMC operation as normal under SM faults. It can effectively improve the MMC...

  3. A new methodology for the computer-aided construction of fault trees

    International Nuclear Information System (INIS)

    Salem, S.L.; Apostolakis, G.E.; Okrent, D.

    1977-01-01

    A methodology for systematically constructing fault trees for general complex systems is developed. A means of modeling component behaviour via decision tables is presented, and a procedure, and a procedure for constructing and editing fault trees, either manually or by computer, is developed. The techniques employed result in a complete fault tree in standard form. In order to demonstrate the methodology, the computer program CAT was developed and is used to construct trees for a nuclear system. By analyzing and comparing these fault trees, several conclusions are reached. First, such an approach can be used to produce fault trees that accurately describe system behaviour. Second, multiple trees can be rapidly produced by defining various TOP events, including system success. Finally, the accuracy and utility of such trees is shown to depend upon the careful development of the decision table models by the analyst, and of the overall system definition itself. Thus the method is seen to be a tool for assisting in the work of fault tree construction rather than a replacement for the careful work of the fault tree analyst. (author)

  4. A computer code for fault tree calculations: PATREC

    International Nuclear Information System (INIS)

    Blin, A.; Carnino, A.; Koen, B.V.; Duchemin, B.; Lanore, J.M.; Kalli, H.

    1978-01-01

    A computer code for evaluating the reliability of complex system by fault tree is described in this paper. It uses pattern recognition approach and programming techniques from IBM PL1 language. It can take account of many of the present day problems: multi-dependencies treatment, dispersion in the reliability data parameters, influence of common mode failures. The code is running currently since two years now in Commissariat a l'Energie Atomique Saclay center and shall be used in a future extension for automatic fault trees construction

  5. Wayne Interim Storage Site: Annual environmental report for calendar year 1990, Wayne, New Jersey

    International Nuclear Information System (INIS)

    1991-09-01

    Environmental monitoring of the US Department of Energy's (DOE) Wayne Interim Storage Site (WISS) (a National Priorities List site) and surrounding area began in 1984. WISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at WISS includes sampling networks for radon and thoron concentrations in air; external gamma radiation exposure; and radium-226, thorium-232, and total uranium concentrations in surface water, sediment, and groundwater. Sediment samples were also analyzed for thorium-230, and several nonradiological parameters were measured in groundwater. 16 refs., 12 figs., 23 tabs

  6. RCRA corrective action program guide (Interim)

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The US Department of Energy (DOE) is responsible for compliance with an increasingly complex spectrum of environmental regulations. One of the most complex programs is the corrective action program proposed by the US Environmental Protection Agency (EPA) under the authority of the Resource Conservation and Recovery Act (RCRA) as amended by the Hazardous and Solid Waste Amendments (HSWA). The proposed regulations were published on July 27, 1990. The proposed Subpart S rule creates a comprehensive program for investigating and remediating releases of hazardous wastes and hazardous waste constituents from solid waste management units (SWMUs) at facilities permitted to treat, store, or dispose of hazardous wastes. This proposed rule directly impacts many DOE facilities which conduct such activities. This guidance document explains the entire RCRA Corrective Action process as outlined by the proposed Subpart S rule, and provides guidance intended to assist those persons responsible for implementing RCRA Corrective Action at DOE facilities.

  7. Estimation of the statistical distribution of faulting in selected areas and the design of an exploration model to detect these faults. Final research report

    International Nuclear Information System (INIS)

    Brooke, J.P.

    1977-11-01

    Selected sites in the United States have been analyzed geomathematically as a part of the technical support program to develop site suitability criteria for High Level Nuclear Waste (HLW) repositories. Using published geological maps and other information, statistical evaluations of the fault patterns and other significant geological features have been completed for 16 selected localities. The observed frequency patterns were compared to theoretical patterns in order to obtain a predictive model for faults at each location. In general, the patterns approximate an exponential distribution function with the exception of Edinburgh, Scotland--the control area. The fault pattern of rocks at Edinburgh closely approximate a negative binominal frequency distribution. The range of fault occurrences encountered during the investigation varied from a low of 0.15 to a high of 10 faults per square mile. Faulting is only one factor in the overall geological evaluation of HLW sites. A general exploration program plan to aid in investigating HLW respository sites has been completed using standard mineral exploration techniques. For the preliminary examination of the suitability of potential sites, present economic conditions indicate the scanning and reconnaissance exploration stages will cost approximately $1,000,000. These would proceed in a logical sequence so that the site selected optimizes the geological factors. The reconnaissance stage of mineral exploration normally utilizes ''saturation geophysics'' to obtain complete geological information. This approach is recommended in the preliminary HLW site investigation process as the most economical and rewarding. Exploration games have been designed for potential sites in the eastern and the western U.S. The game matrix approach is recommended as a suitable technique for the allocation of resources in a search problem during this preliminary phase

  8. Transuranic waste storage and assay facility (TRUSAF) interim safety basis

    International Nuclear Information System (INIS)

    Gibson, K.D.

    1995-09-01

    The TRUSAF ISB is based upon current facility configuration and procedures. The purpose of the document is to provide the basis for interim operation or restrictions on interim operations and the authorization basis for the TRUSAF at the Hanford Site. The previous safety analysis document TRUSAF hazards Identification and Evaluation (WHC 1977) is superseded by this document

  9. Modeling fault rupture hazard for the proposed repository at Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    Coppersmith, K.J.; Youngs, R.R.

    1992-01-01

    In this paper as part of the Electric Power Research Institute's High Level Waste program, the authors have developed a preliminary probabilistic model for assessing the hazard of fault rupture to the proposed high level waste repository at Yucca Mountain. The model is composed of two parts: the earthquake occurrence model that describes the three-dimensional geometry of earthquake sources and the earthquake recurrence characteristics for all sources in the site vicinity; and the rupture model that describes the probability of coseismic fault rupture of various lengths and amounts of displacement within the repository horizon 350 m below the surface. The latter uses empirical data from normal-faulting earthquakes to relate the rupture dimensions and fault displacement amounts to the magnitude of the earthquake. using a simulation procedure, we allow for earthquake occurrence on all of the earthquake sources in the site vicinity, model the location and displacement due to primary faults, and model the occurrence of secondary faulting in conjunction with primary faulting

  10. The Safety Assessment of Long term Interim Storage at Sellafield

    International Nuclear Information System (INIS)

    Buchan, Andrew B.

    2014-01-01

    that are most significant in terms of frequency and unmitigated potential consequences PSA looks at the full range of fault sequences and allows full incorporation of the reliability and failure probability of the safety measures and other features of the design and operations SAA considers significant but unlikely accidents where off-site consequences are likely to significantly affect the critical group and provides information on their progression, within the facility and also beyond the site boundary. The paper will illustrate how these techniques have been utilised to facilitate design, operation, resilience evaluation and accident management of facilities supporting long term interim storage at Sellafield. (author)

  11. Optimization of Second Fault Detection Thresholds to Maximize Mission POS

    Science.gov (United States)

    Anzalone, Evan

    2018-01-01

    In order to support manned spaceflight safety requirements, the Space Launch System (SLS) has defined program-level requirements for key systems to ensure successful operation under single fault conditions. To accommodate this with regards to Navigation, the SLS utilizes an internally redundant Inertial Navigation System (INS) with built-in capability to detect, isolate, and recover from first failure conditions and still maintain adherence to performance requirements. The unit utilizes multiple hardware- and software-level techniques to enable detection, isolation, and recovery from these events in terms of its built-in Fault Detection, Isolation, and Recovery (FDIR) algorithms. Successful operation is defined in terms of sufficient navigation accuracy at insertion while operating under worst case single sensor outages (gyroscope and accelerometer faults at launch). In addition to first fault detection and recovery, the SLS program has also levied requirements relating to the capability of the INS to detect a second fault, tracking any unacceptable uncertainty in knowledge of the vehicle's state. This detection functionality is required in order to feed abort analysis and ensure crew safety. Increases in navigation state error and sensor faults can drive the vehicle outside of its operational as-designed environments and outside of its performance envelope causing loss of mission, or worse, loss of crew. The criteria for operation under second faults allows for a larger set of achievable missions in terms of potential fault conditions, due to the INS operating at the edge of its capability. As this performance is defined and controlled at the vehicle level, it allows for the use of system level margins to increase probability of mission success on the operational edges of the design space. Due to the implications of the vehicle response to abort conditions (such as a potentially failed INS), it is important to consider a wide range of failure scenarios in terms of

  12. Rectifier Fault Diagnosis and Fault Tolerance of a Doubly Fed Brushless Starter Generator

    Directory of Open Access Journals (Sweden)

    Liwei Shi

    2015-01-01

    Full Text Available This paper presents a rectifier fault diagnosis method with wavelet packet analysis to improve the fault tolerant four-phase doubly fed brushless starter generator (DFBLSG system reliability. The system components and fault tolerant principle of the high reliable DFBLSG are given. And the common fault of the rectifier is analyzed. The process of wavelet packet transforms fault detection/identification algorithm is introduced in detail. The fault tolerant performance and output voltage experiments were done to gather the energy characteristics with a voltage sensor. The signal is analyzed with 5-layer wavelet packets, and the energy eigenvalue of each frequency band is obtained. Meanwhile, the energy-eigenvalue tolerance was introduced to improve the diagnostic accuracy. With the wavelet packet fault diagnosis, the fault tolerant four-phase DFBLSG can detect the usual open-circuit fault and operate in the fault tolerant mode if there is a fault. The results indicate that the fault analysis techniques in this paper are accurate and effective.

  13. Interim Particulate Matter Test Method for the Determination of Particulate Matter from Gas Turbine Engines, SERDP Project WP-1538 Final Report

    Science.gov (United States)

    Under Project No. WP-1538 of the Strategic Environmental Research and Development Program, the U. S. Air Force's Arnold Engineering Development Center (AEDC) is developing an interim test method for non-volatile particulate matter (PM) specifically for the Joint Strike Fighter (J...

  14. Fault Management Techniques in Human Spaceflight Operations

    Science.gov (United States)

    O'Hagan, Brian; Crocker, Alan

    2006-01-01

    This paper discusses human spaceflight fault management operations. Fault detection and response capabilities available in current US human spaceflight programs Space Shuttle and International Space Station are described while emphasizing system design impacts on operational techniques and constraints. Preflight and inflight processes along with products used to anticipate, mitigate and respond to failures are introduced. Examples of operational products used to support failure responses are presented. Possible improvements in the state of the art, as well as prioritization and success criteria for their implementation are proposed. This paper describes how the architecture of a command and control system impacts operations in areas such as the required fault response times, automated vs. manual fault responses, use of workarounds, etc. The architecture includes the use of redundancy at the system and software function level, software capabilities, use of intelligent or autonomous systems, number and severity of software defects, etc. This in turn drives which Caution and Warning (C&W) events should be annunciated, C&W event classification, operator display designs, crew training, flight control team training, and procedure development. Other factors impacting operations are the complexity of a system, skills needed to understand and operate a system, and the use of commonality vs. optimized solutions for software and responses. Fault detection, annunciation, safing responses, and recovery capabilities are explored using real examples to uncover underlying philosophies and constraints. These factors directly impact operations in that the crew and flight control team need to understand what happened, why it happened, what the system is doing, and what, if any, corrective actions they need to perform. If a fault results in multiple C&W events, or if several faults occur simultaneously, the root cause(s) of the fault(s), as well as their vehicle-wide impacts, must be

  15. K basins interim remedial action health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  16. Interim safety basis for fuel supply shutdown facility

    International Nuclear Information System (INIS)

    Brehm, J.R.; Deobald, T.L.; Benecke, M.W.; Remaize, J.A.

    1995-01-01

    This ISB in conjunction with the new TSRs, will provide the required basis for interim operation or restrictions on interim operations and administrative controls for the Facility until a SAR is prepared in accordance with the new requirements. It is concluded that the risk associated with the current operational mode of the Facility, uranium closure, clean up, and transition activities required for permanent closure, are within Risk Acceptance Guidelines. The Facility is classified as a Moderate Hazard Facility because of the potential for an unmitigated fire associated with the uranium storage buildings

  17. Fault displacement along the Naruto-South fault, the Median Tectonic Line active fault system in the eastern part of Shikoku, southwestern Japan

    OpenAIRE

    高田, 圭太; 中田, 高; 後藤, 秀昭; 岡田, 篤正; 原口, 強; 松木, 宏彰

    1998-01-01

    The Naruto-South fault is situated of about 1000m south of the Naruto fault, the Median Tectonic Line active fault system in the eastern part of Shikoku. We investigated fault topography and subsurface geology of this fault by interpretation of large scale aerial photographs, collecting borehole data and Geo-Slicer survey. The results obtained are as follows; 1) The Naruto-South fault runs on the Yoshino River deltaic plain at least 2.5 km long with fault scarplet. the Naruto-South fault is o...

  18. Fusion tritium program in Japan

    International Nuclear Information System (INIS)

    Okamoto, M.; Yoshida, H.; Naruse, Y.

    1988-01-01

    Nuclear Fusion Council, Atomic Energy Commission of Japan, has started to review the nuclear fusion R and D plan for the next stage, post JT-60. The council launched a subcommittee on fundamental issues in the nuclear fusion development in 1985, for review of the basic strategy of a development plan. The subcommittee presented an interim report in Feb. 1986 after 6 months discussion and the report was approved by the Nuclear Fusion Council. Two major R and D programs described in the interim report are the development of a Tokamak type large facility and the comprehensive development of the fusion reactor technology. The latter means to promote the reactor technologies which will be essential in the future to construct not only a D/T burning but also a DEMO reactor. The Nuclear Fusion Development Program in Japan is shown. The interim report recommended to organize two subcommittees to establish an integrated national R and D plan; one was for the design of the next step large facility and the other was for the R and program of the fusion technology. The subcommittee for the latter consisted of 7 working groups; one of them was organized for the tritium technology

  19. Method research of fault diagnosis based on rough set for nuclear power plant

    International Nuclear Information System (INIS)

    Chen Zhihui; Xia Hong

    2005-01-01

    Nuclear power equipment fault feature is complicated and uncertain. Rough set theory can express and deal with vagueness and uncertainty, so that it can be introduced nuclear power fault diagnosis to analyze and process historical data to find rule of fault feature. Rough set theory treatment step: Data preprocessing, attribute reduction, attribute value reduction, rule generation. According to discernibility matrix definition and nature, we can utilize discernibility matrix in reduction algorithm that make attribute and attribute value reduction, so that it can minish algorithmic complication and simplify programming. This algorithm is applied to the nuclear power fault diagnosis to generate rules of diagnosis. Using these rules, we have diagnosed five kinds of model faults correctly. (authors)

  20. Robust Fault Diagnosis Design for Linear Multiagent Systems with Incipient Faults

    Directory of Open Access Journals (Sweden)

    Jingping Xia

    2015-01-01

    Full Text Available The design of a robust fault estimation observer is studied for linear multiagent systems subject to incipient faults. By considering the fact that incipient faults are in low-frequency domain, the fault estimation of such faults is proposed for discrete-time multiagent systems based on finite-frequency technique. Moreover, using the decomposition design, an equivalent conclusion is given. Simulation results of a numerical example are presented to demonstrate the effectiveness of the proposed techniques.

  1. Stafford fault system: 120 million year fault movement history of northern Virginia

    Science.gov (United States)

    Powars, David S.; Catchings, Rufus D.; Horton, J. Wright; Schindler, J. Stephen; Pavich, Milan J.

    2015-01-01

    The Stafford fault system, located in the mid-Atlantic coastal plain of the eastern United States, provides the most complete record of fault movement during the past ~120 m.y. across the Virginia, Washington, District of Columbia (D.C.), and Maryland region, including displacement of Pleistocene terrace gravels. The Stafford fault system is close to and aligned with the Piedmont Spotsylvania and Long Branch fault zones. The dominant southwest-northeast trend of strong shaking from the 23 August 2011, moment magnitude Mw 5.8 Mineral, Virginia, earthquake is consistent with the connectivity of these faults, as seismic energy appears to have traveled along the documented and proposed extensions of the Stafford fault system into the Washington, D.C., area. Some other faults documented in the nearby coastal plain are clearly rooted in crystalline basement faults, especially along terrane boundaries. These coastal plain faults are commonly assumed to have undergone relatively uniform movement through time, with average slip rates from 0.3 to 1.5 m/m.y. However, there were higher rates during the Paleocene–early Eocene and the Pliocene (4.4–27.4 m/m.y), suggesting that slip occurred primarily during large earthquakes. Further investigation of the Stafford fault system is needed to understand potential earthquake hazards for the Virginia, Maryland, and Washington, D.C., area. The combined Stafford fault system and aligned Piedmont faults are ~180 km long, so if the combined fault system ruptured in a single event, it would result in a significantly larger magnitude earthquake than the Mineral earthquake. Many structures most strongly affected during the Mineral earthquake are along or near the Stafford fault system and its proposed northeastward extension.

  2. Implementation plan for deployment of Federal Interim Storage facilities for commercial spent nuclear fuel

    International Nuclear Information System (INIS)

    1986-12-01

    This document is the third annual report on plans for providing Federal Interim Storage (FIS) capacity. References are made to the first and second annual reports, as necessary. Background factors and aspects that were considered in the development of this deployment plan and activities and interactions considered to be required to implement an FIS program are discussed. A generic description of the approach that the Department plans to follow in deploying FIS facilities is also described

  3. Program Management Challenges in a Joint Service Environment

    National Research Council Canada - National Science Library

    Taneyhill, Dorothy E

    2007-01-01

    ... or modifications of the same design. The Interim Defense Acquisition Guidebook defines a Joint Program Management Office as any defense acquisition system, subsystem, component, or technology program that involves formal management...

  4. Optimal fault signal estimation

    NARCIS (Netherlands)

    Stoorvogel, Antonie Arij; Niemann, H.H.; Saberi, A.; Sannuti, P.

    2002-01-01

    We consider here both fault identification and fault signal estimation. Regarding fault identification, we seek either exact or almost fault identification. On the other hand, regarding fault signal estimation, we seek either $H_2$ optimal, $H_2$ suboptimal or Hinfinity suboptimal estimation. By

  5. Development of a fault test experimental facility model using Matlab

    Energy Technology Data Exchange (ETDEWEB)

    Pereira, Iraci Martinez; Moraes, Davi Almeida, E-mail: martinez@ipen.br, E-mail: dmoraes@dk8.com.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2015-07-01

    The Fault Test Experimental Facility was developed to simulate a PWR nuclear power plant and is instrumented with temperature, level and pressure sensors. The Fault Test Experimental Facility can be operated to generate normal and fault data, and these failures can be added initially small, and their magnitude being increasing gradually. This work presents the Fault Test Experimental Facility model developed using the Matlab GUIDE (Graphical User Interface Development Environment) toolbox that consists of a set of functions designed to create interfaces in an easy and fast way. The system model is based on the mass and energy inventory balance equations. Physical as well as operational aspects are taken into consideration. The interface layout looks like a process flowchart and the user can set the input variables. Besides the normal operation conditions, there is the possibility to choose a faulty variable from a list. The program also allows the user to set the noise level for the input variables. Using the model, data were generated for different operational conditions, both under normal and fault conditions with different noise levels added to the input variables. Data generated by the model will be compared with Fault Test Experimental Facility data. The Fault Test Experimental Facility theoretical model results will be used for the development of a Monitoring and Fault Detection System. (author)

  6. Development of a fault test experimental facility model using Matlab

    International Nuclear Information System (INIS)

    Pereira, Iraci Martinez; Moraes, Davi Almeida

    2015-01-01

    The Fault Test Experimental Facility was developed to simulate a PWR nuclear power plant and is instrumented with temperature, level and pressure sensors. The Fault Test Experimental Facility can be operated to generate normal and fault data, and these failures can be added initially small, and their magnitude being increasing gradually. This work presents the Fault Test Experimental Facility model developed using the Matlab GUIDE (Graphical User Interface Development Environment) toolbox that consists of a set of functions designed to create interfaces in an easy and fast way. The system model is based on the mass and energy inventory balance equations. Physical as well as operational aspects are taken into consideration. The interface layout looks like a process flowchart and the user can set the input variables. Besides the normal operation conditions, there is the possibility to choose a faulty variable from a list. The program also allows the user to set the noise level for the input variables. Using the model, data were generated for different operational conditions, both under normal and fault conditions with different noise levels added to the input variables. Data generated by the model will be compared with Fault Test Experimental Facility data. The Fault Test Experimental Facility theoretical model results will be used for the development of a Monitoring and Fault Detection System. (author)

  7. Interim report - geotechnical site assessment methodology. Vol.1

    International Nuclear Information System (INIS)

    Tunbridge, L.W.; Richards, L.R.

    1983-05-01

    An interim report summarizing the research conducted on geotechnical site assessment methodology at the Carwynnen test mine in Cornwall. The geological setting of the test site in the Cornubian granite batholith is described. The effect of structure imposed by discontinuities on the engineering behaviour of rock masses is discussed and the scanline survey method of obtaining data on discontinuities in the rock mass is described. The requirement for remote geophysical methods of characterizing the mass is discussed and initial experiments using seismic and ultrasonic velocity measurements are reported. Computer programs to perform statistical analysis of the discontinuity patterns are described. Overcoring and hydraulic fracturing methods of determining the in-situ stress are briefly described and the results of a programme of in-situ stress measurements using the overcoring method are reported. (author)

  8. Hazelwood Interim Storage Site environmental surveillance report for calendar year 1993

    International Nuclear Information System (INIS)

    1994-06-01

    This report summarizes the results of environmental surveillance activities conducted at the Hazelwood Interim Storage Site (HISS) during calendar year 1993. It includes an overview of site operations, the basis for monitoring for radioactive and non-radioactive parameters, summaries of environmental program at HISS, a summary of the results, and the calculated hypothetical radiation dose to the offsite population. Environmental surveillance activities were conducted in accordance with the site environmental monitoring plan, which describes the rationale and design criteria for the surveillance program, the frequency of sampling and analysis, specific sampling and analysis procedures, and quality assurance requirements. The US Department of Energy (DOE) began environmental monitoring of HISS in 1984, when the site was assigned to DOE by Congress through the energy and Water Development Appropriations Act and subsequent to DOE's Formerly Utilized Sites Remediation Action Program (FUSRAP). Contamination at HISS originated from uranium processing work conducted at Mallinckrodt Chemical Works at the St. Louis Downtown Site (SLDS) from 1942 through 1957

  9. Faulting at Mormon Point, Death Valley, California: A low-angle normal fault cut by high-angle faults

    Science.gov (United States)

    Keener, Charles; Serpa, Laura; Pavlis, Terry L.

    1993-04-01

    New geophysical and fault kinematic studies indicate that late Cenozoic basin development in the Mormon Point area of Death Valley, California, was accommodated by fault rotations. Three of six fault segments recognized at Mormon Point are now inactive and have been rotated to low dips during extension. The remaining three segments are now active and moderately to steeply dipping. From the geophysical data, one active segment appears to offset the low-angle faults in the subsurface of Death Valley.

  10. Computer-oriented approach to fault-tree construction

    International Nuclear Information System (INIS)

    Salem, S.L.; Apostolakis, G.E.; Okrent, D.

    1976-11-01

    A methodology for systematically constructing fault trees for general complex systems is developed and applied, via the Computer Automated Tree (CAT) program, to several systems. A means of representing component behavior by decision tables is presented. The method developed allows the modeling of components with various combinations of electrical, fluid and mechanical inputs and outputs. Each component can have multiple internal failure mechanisms which combine with the states of the inputs to produce the appropriate output states. The generality of this approach allows not only the modeling of hardware, but human actions and interactions as well. A procedure for constructing and editing fault trees, either manually or by computer, is described. The techniques employed result in a complete fault tree, in standard form, suitable for analysis by current computer codes. Methods of describing the system, defining boundary conditions and specifying complex TOP events are developed in order to set up the initial configuration for which the fault tree is to be constructed. The approach used allows rapid modifications of the decision tables and systems to facilitate the analysis and comparison of various refinements and changes in the system configuration and component modeling

  11. Real-time fault diagnosis and fault-tolerant control

    OpenAIRE

    Gao, Zhiwei; Ding, Steven X.; Cecati, Carlo

    2015-01-01

    This "Special Section on Real-Time Fault Diagnosis and Fault-Tolerant Control" of the IEEE Transactions on Industrial Electronics is motivated to provide a forum for academic and industrial communities to report recent theoretic/application results in real-time monitoring, diagnosis, and fault-tolerant design, and exchange the ideas about the emerging research direction in this field. Twenty-three papers were eventually selected through a strict peer-reviewed procedure, which represent the mo...

  12. In vitro evaluation of the marginal integrity of CAD/CAM interim crowns.

    Science.gov (United States)

    Kelvin Khng, Kwang Yong; Ettinger, Ronald L; Armstrong, Steven R; Lindquist, Terry; Gratton, David G; Qian, Fang

    2016-05-01

    The accuracy of interim crowns made with computer-aided design and computer-aided manufacturing (CAD/CAM) systems has not been well investigated. The purpose of this in vitro study was to evaluate the marginal integrity of interim crowns made by CAD/CAM compared with that of conventional polymethylmethacrylate (PMMA) crowns. A dentoform mandibular left second premolar was prepared for a ceramic crown and scanned for the fabrication of 60 stereolithical resin dies, half of which were scanned to fabricate 15 Telio CAD-CEREC and 15 Paradigm MZ100-E4D-E4D crowns. Fifteen Caulk and 15 Jet interim crowns were made on the remaining resin dies. All crowns were cemented with Tempgrip under a 17.8-N load, thermocycled for 1000 cycles, placed in 0.5% acid fuschin for 24 hours, and embedded in epoxy resin before sectioning from the mid-buccal to mid-lingual surface. The marginal discrepancy was measured using a traveling microscope, and dye penetration was measured as a percentage of the overall length under the crown. The mean vertical marginal discrepancy of the conventionally made interim crowns was greater than for the CAD/CAM crowns (P=.006), while no difference was found for the horizontal component (P=.276). The mean vertical marginal discrepancy at the facial surface of the Caulk crowns was significantly greater than that of the other 3 types of interim crowns (Pmargin, the mean horizontal component of the Telio crowns was significantly larger than that of the other 3 types, with no difference at the lingual margins (P=.150). The mean percentage dye penetration for the Paradigm MZ100-E4D crowns was significantly greater and for Jet crowns significantly smaller than for the other 3 crowns (Pmarginal discrepancies of the Jet interim crowns at the facial surface and with the horizontal marginal discrepancies of the Caulk interim crowns at the lingual surface (Pmarginal discrepancy was found with the interim crowns fabricated by CAD/CAM as compared with PMMA crowns

  13. Project management plan for Reactor 105-C Interim Safe Storage project

    International Nuclear Information System (INIS)

    Plagge, H.A.

    1996-09-01

    Reactor 105-C (located on the Hanford Site in Richland, Washington) will be placed into an interim safe storage condition such that (1) interim inspection can be limited to a 5-year frequency; (2) containment ensures that releases to the environmental are not credible under design basis conditions; and (3) final safe storage configuration shall not preclude or significantly increase the cost for any decommissioning alternatives for the reactor assembly.This project management plan establishes plans, organizational responsibilities, control systems, and procedures for managing the execution of Reactor 105-C interim safe storage activities to meet programmatic requirements within authorized funding and approved schedules

  14. Interim FDG-PET Scan in Hodgkin's Lymphoma: Hopes and Caveats

    Directory of Open Access Journals (Sweden)

    M. André

    2011-01-01

    Full Text Available FDG-PET has recently emerged as an important tool for the management of Hodgkins lymphoma. Although its use for initial staging and response evaluation at the end of treatment is well established, the place of interim PET for response assessment and subsequent treatment tailoring is still quite controversial. The use of interim PET after a few cycles of chemotherapy may allow treatment reduction for good responders, leading to lesser treatment toxicities as well as early treatment adaptation for bad responders with a potential higher chance for cure. Interpretation of interim PET is a rapidly moving field. Actually, visual interpretation is preferred over quantitative interpretation in this situation. The notion of minimal residual uptake emerged for faint persisting FDG uptake, but has evolved during the recent years. Guidelines using mediastinum and liver as references have been proposed at the expert meeting in Deauville 2009. Actually, several trials are ongoing both for localised and advanced disease to evaluate the FDG-PET potential for early treatment monitoring and tailoring. Until the results of these prospective randomized trials become available, treatment changes according to the interim PET results should remain inappropriate and limited to well-conducted clinical trials.

  15. Fault kinematics and localised inversion within the Troms-Finnmark Fault Complex, SW Barents Sea

    Science.gov (United States)

    Zervas, I.; Omosanya, K. O.; Lippard, S. J.; Johansen, S. E.

    2018-04-01

    The areas bounding the Troms-Finnmark Fault Complex are affected by complex tectonic evolution. In this work, the history of fault growth, reactivation, and inversion of major faults in the Troms-Finnmark Fault Complex and the Ringvassøy Loppa Fault Complex is interpreted from three-dimensional seismic data, structural maps and fault displacement plots. Our results reveal eight normal faults bounding rotated fault blocks in the Troms-Finnmark Fault Complex. Both the throw-depth and displacement-distance plots show that the faults exhibit complex configurations of lateral and vertical segmentation with varied profiles. Some of the faults were reactivated by dip-linkages during the Late Jurassic and exhibit polycyclic fault growth, including radial, syn-sedimentary, and hybrid propagation. Localised positive inversion is the main mechanism of fault reactivation occurring at the Troms-Finnmark Fault Complex. The observed structural styles include folds associated with extensional faults, folded growth wedges and inverted depocentres. Localised inversion was intermittent with rifting during the Middle Jurassic-Early Cretaceous at the boundaries of the Troms-Finnmark Fault Complex to the Finnmark Platform. Additionally, tectonic inversion was more intense at the boundaries of the two fault complexes, affecting Middle Triassic to Early Cretaceous strata. Our study shows that localised folding is either a product of compressional forces or of lateral movements in the Troms-Finnmark Fault Complex. Regional stresses due to the uplift in the Loppa High and halokinesis in the Tromsø Basin are likely additional causes of inversion in the Troms-Finnmark Fault Complex.

  16. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Interaction with other offices and interim actions. 93.401 Section 93.401 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES... Human Services General Information § 93.401 Interaction with other offices and interim actions. (a) ORI...

  17. 42 CFR 417.572 - Budget and enrollment forecast and interim reports.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Budget and enrollment forecast and interim reports... PLANS, AND HEALTH CARE PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.572 Budget and enrollment forecast and interim reports. (a) Annual submittal. The HMO or CMP must submit an annual operating budget...

  18. Study of a phase-to-ground fault on a 400 kV overhead transmission line

    Science.gov (United States)

    Iagăr, A.; Popa, G. N.; Diniş, C. M.

    2018-01-01

    Power utilities need to supply their consumers at high power quality level. Because the faults that occur on High-Voltage and Extra-High-Voltage transmission lines can cause serious damages in underlying transmission and distribution systems, it is important to examine each fault in detail. In this work we studied a phase-to-ground fault (on phase 1) of 400 kV overhead transmission line Mintia-Arad. Indactic® 650 fault analyzing system was used to record the history of the fault. Signals (analog and digital) recorded by Indactic® 650 were visualized and analyzed by Focus program. Summary of fault report allowed evaluation of behavior of control and protection equipment and determination of cause and location of the fault.

  19. A master system for power system fault phenomena

    Energy Technology Data Exchange (ETDEWEB)

    Yoo, Myung Ho; Jang, Sang Ho; Hong, Joon Hee; Min, Wan Ki; Yoo, Chang Hwan [Korea Electric Power Corp. (KEPCO), Taejon (Korea, Republic of). Research Center

    1995-12-31

    This report includes as follows - Real time digital simulator - Remote measuring, analyzing and reproducing system of power system fault data -Power system reduction method program using EMTP -Test system for protection device. (author). 22 refs., 38 figs.

  20. Early interim 18F-FDG PET in Hodgkin's lymphoma: evaluation on 304 patients

    International Nuclear Information System (INIS)

    Zinzani, Pier Luigi; Stefoni, Vittorio; Broccoli, Alessandro; Argnani, Lisa; Baccarani, Michele; Rigacci, Luigi; Puccini, Benedetta; Castagnoli, Antonio; Vaggelli, Luca; Zanoni, Lucia; Fanti, Stefano

    2012-01-01

    The use of early (interim) PET restaging during first-line therapy of Hodgkin's lymphoma (HL) in clinical practice has considerably increased because of its ability to provide early recognition of treatment failure allowing patients to be transferred to more intensive treatment regimens. Between June 1997 and June 2009, 304 patients with newly diagnosed HL (147 early stage and 157 advanced stage) were treated with the ABVD regimen at two Italian institutions. Patients underwent PET staging and restaging at baseline, after two cycles of therapy and at the end of the treatment. Of the 304 patients, 53 showed a positive interim PET scan and of these only 13 (24.5%) achieved continuous complete remission (CCR), whereas 251 patients showed a negative PET scan and of these 231 (92%) achieved CCR. Comparison between interim PET-positive and interim PET-negative patients indicated a significant association between PET findings and 9-year progression-free survival and 9-year overall survival, with a median follow-up of 31 months. Among the early-stage patients, 19 had a positive interim PET scan and only 4 (21%) achieved CCR; among the 128 patients with a negative interim PET scan, 122 (97.6%) achieved CCR. Among the advanced-stage patients, 34 showed a persistently positive PET scan with only 9 (26.4%) achieving CCR, whereas 123 showed a negative interim PET scan with 109 (88.6%) achieving CCR. Our results demonstrate the role of an early PET scan as a significant step forward in the management of patients with early-stage or advanced-stage HL. (orig.)

  1. 10 CFR 431.401 - Petitions for waiver, and applications for interim waiver, of test procedure.

    Science.gov (United States)

    2010-01-01

    ... Renewable Energy, U.S. Department of Energy. Each Application for Interim Waiver must reference the Petition... Renewable Energy. (e) Provisions specific to interim waivers—(1) Disposition of application. If... 10 Energy 3 2010-01-01 2010-01-01 false Petitions for waiver, and applications for interim waiver...

  2. Wayne Interim Storage Site environmental report for calendar year 1992, 868 Black Oak Ridge Road, Wayne, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    This report describes the environmental surveillance program at the Wayne Interim Storage Site (WISS) and provides the results for 1992. The fenced, site, 32 km (20 mi) northwest of Newark, New Jersey, was used between 1948 and 1971 for commercial processing of monazite sand to separate natural radioisotopes - predominantly thorium. Environmental surveillance of WISS began in 1984 in accordance with Department of Energy (DOE) Order 5400.1 when Congress added the site to DOE`s Formerly Utilized Sites Remedial Action Program (FUSRAP). The environmental surveillance program at WISS includes sampling networks for radon and thoron in air; external gamma radiation exposure; radium-226, radium-228, thorium-230, thorium-232, total uranium, and several chemicals in surface water and sediment; and total uranium, radium-226, radium-228, thorium-230, thorium-232, and organic and inorganic chemicals in groundwater. Monitoring results are compared with applicable Environmental Protection Agency (EPA) and state standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements. This monitoring program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Results for environmental surveillance in 1992 show that the concentrations of all radioactive and most chemical contaminants were below applicable standards.

  3. Fit of interim crowns fabricated using photopolymer-jetting 3D printing.

    Science.gov (United States)

    Mai, Hang-Nga; Lee, Kyu-Bok; Lee, Du-Hyeong

    2017-08-01

    The fit of interim crowns fabricated using 3-dimensional (3D) printing is unknown. The purpose of this in vitro study was to evaluate the fit of interim crowns fabricated using photopolymer-jetting 3D printing and to compare it with that of milling and compression molding methods. Twelve study models were fabricated by making an impression of a metal master model of the mandibular first molar. On each study model, interim crowns (N=36) were fabricated using compression molding (molding group, n=12), milling (milling group, n=12), and 3D polymer-jetting methods. The crowns were prepared as follows: molding group, overimpression technique; milling group, a 5-axis dental milling machine; and polymer-jetting group using a 3D printer. The fit of interim crowns was evaluated in the proximal, marginal, internal axial, and internal occlusal regions by using the image-superimposition and silicone-replica techniques. The Mann-Whitney U test and Kruskal-Wallis tests were used to compare the results among groups (α=.05). Compared with the molding group, the milling and polymer-jetting groups showed more accurate results in the proximal and marginal regions (P3D printing significantly enhanced the fit of interim crowns, particularly in the occlusal region. Copyright © 2016 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  4. Colonie Interim Storage Site: Annual environmental report for calendar year 1990, Colonie, New York

    International Nuclear Information System (INIS)

    1991-09-01

    Environmental monitoring of the US Department of Energy's (DOE) Colonie Interim Storage Site (CISS) and surrounding area began in 1984. CISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sties where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The routine environmental monitoring program at CISS includes sampling networks for external gamma radiation exposures and for radium-226, throium-232, an total uranium concentrations in surface water, sediment, and groundwater. Additionally, the nonradiological parameters volatile and semivolatile organics, pesticides/polychlorinated biphenyls (PCBs), metals, total organic carbon (TOC), total organic halides (TOX), specific conductivity, and pH are measured in groundwater. 14 refs., 20 figs., 25 tabs

  5. SALP-3: A computer program for fault-tree analysis. Description and how-to-use. (Sensitivity analysis by list processing)

    International Nuclear Information System (INIS)

    Contini, S.; Astolfi, M.; Muysenberg, C.L. van den; Volta, G.

    1979-01-01

    The main characteristics and the how-to-use of the computer program SALP-3 for the analysis of coherent systems are described. The program is writen in PL/1 for the IBM/370-165. A syntactic analysis is made for the imput (fault-tree and data) and appropriate messages are supplied, should and error take place. The significant minimal cut sets (MCS) are searched by the use of algorithms based on the direct manipulation of the tree. The MCS, of whichever order, are supplied in output in order of importance with reference to a given probability threshold. The computer program SALP-3 represents only the intermediate results of a project whose objective is the implementation of a computer program for the analysis of both coherent and non-coherent structure functions, and, finally, for the automatic event tree analysis. The last part of the report illustrates the developments regarding the improvement in progress

  6. Overview of the US spent nuclear fuel program

    International Nuclear Information System (INIS)

    Hurt, W.L.

    1999-01-01

    This report, Overview of the United States Spent Nuclear Fuel Program, December, 1997, summarizes the U.S. strategy for interim management and ultimate disposition of spent nuclear fuel from research and test reactors. The key elements of this strategy include consolidation of this spent nuclear fuel at three sites, preparation of the fuel for geologic disposal in road-ready packages, and low-cost dry interim storage until the planned geologic repository is opened. The U.S. has a number of research programs in place that are intended to Provide data and technologies to support both characterization and disposition of the fuel. (author)

  7. A Non-Traditional Interim Project.

    Science.gov (United States)

    Brown, Diane; Ward, Dorothy

    1980-01-01

    Describes a project initiated by the Foreign Language Department of Birmingham-Southern College for their Interim term and discusses an interdisciplinary course focusing on Medieval Europe. The course included presentations on German and French language and literature, as well as lectures on the arts, philosophy, and family life of the period.…

  8. Maywood Interim Storage Site environmental report for calendar year 1992, 100 West Hunter Avenue, Maywood, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    This report describes the environmental surveillance program at the Maywood Interim Storage Site (MISS) and provides the results for 1992. Environmental monitoring of MISS began in 1984, when the site was assigned to DOE by Congress through the Energy and Water Development Appropriations Act and was placed under DOE`s Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. MISS is part of a National Priorities List (NPL) site. The environmental surveillance program at MISS includes sampling networks for radon and thoron in air; external gamma radiation exposure; and radium-226, radium-228, thorium-232, and total uranium in surface water, sediment, and groundwater. Additionally, chemical analysis includes metals and organic compounds in surface water and groundwater and metals in sediments. This program assists in fulfilling the DOE objective of measuring and monitoring effluents from DOE activities and calculating hypothetical doses to members of the general public. Monitoring results are compared with applicable Environmental Protection Agency (EPA) and state standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements. Environmental standards are established to protect public health and the environment. The radiological data for all media sampled support the conclusion that doses to the public are not distinguishable from natural background radiation.

  9. Design of fault simulator

    Energy Technology Data Exchange (ETDEWEB)

    Gabbar, Hossam A. [Faculty of Energy Systems and Nuclear Science, University of Ontario Institute of Technology (UOIT), Ontario, L1H 7K4 (Canada)], E-mail: hossam.gabbar@uoit.ca; Sayed, Hanaa E.; Osunleke, Ajiboye S. [Okayama University, Graduate School of Natural Science and Technology, Division of Industrial Innovation Sciences Department of Intelligent Systems Engineering, Okayama 700-8530 (Japan); Masanobu, Hara [AspenTech Japan Co., Ltd., Kojimachi Crystal City 10F, Kojimachi, Chiyoda-ku, Tokyo 102-0083 (Japan)

    2009-08-15

    Fault simulator is proposed to understand and evaluate all possible fault propagation scenarios, which is an essential part of safety design and operation design and support of chemical/production processes. Process models are constructed and integrated with fault models, which are formulated in qualitative manner using fault semantic networks (FSN). Trend analysis techniques are used to map real time and simulation quantitative data into qualitative fault models for better decision support and tuning of FSN. The design of the proposed fault simulator is described and applied on experimental plant (G-Plant) to diagnose several fault scenarios. The proposed fault simulator will enable industrial plants to specify and validate safety requirements as part of safety system design as well as to support recovery and shutdown operation and disaster management.

  10. Fault Management Metrics

    Science.gov (United States)

    Johnson, Stephen B.; Ghoshal, Sudipto; Haste, Deepak; Moore, Craig

    2017-01-01

    This paper describes the theory and considerations in the application of metrics to measure the effectiveness of fault management. Fault management refers here to the operational aspect of system health management, and as such is considered as a meta-control loop that operates to preserve or maximize the system's ability to achieve its goals in the face of current or prospective failure. As a suite of control loops, the metrics to estimate and measure the effectiveness of fault management are similar to those of classical control loops in being divided into two major classes: state estimation, and state control. State estimation metrics can be classified into lower-level subdivisions for detection coverage, detection effectiveness, fault isolation and fault identification (diagnostics), and failure prognosis. State control metrics can be classified into response determination effectiveness and response effectiveness. These metrics are applied to each and every fault management control loop in the system, for each failure to which they apply, and probabilistically summed to determine the effectiveness of these fault management control loops to preserve the relevant system goals that they are intended to protect.

  11. Study on seismic hazard assessment of large active fault systems. Evolution of fault systems and associated geomorphic structures: fault model test and field survey

    International Nuclear Information System (INIS)

    Ueta, Keichi; Inoue, Daiei; Miyakoshi, Katsuyoshi; Miyagawa, Kimio; Miura, Daisuke

    2003-01-01

    Sandbox experiments and field surveys were performed to investigate fault system evolution and fault-related deformation of ground surface, the Quaternary deposits and rocks. The summary of the results is shown below. 1) In the case of strike-slip faulting, the basic fault sequence runs from early en echelon faults and pressure ridges through linear trough. The fault systems associated with the 2000 western Tottori earthquake are shown as en echelon pattern that characterize the early stage of wrench tectonics, therefore no thoroughgoing surface faulting was found above the rupture as defined by the main shock and aftershocks. 2) Low-angle and high-angle reverse faults commonly migrate basinward with time, respectively. With increasing normal fault displacement in bedrock, normal fault develops within range after reverse fault has formed along range front. 3) Horizontal distance of surface rupture from the bedrock fault normalized by the height of the Quaternary deposits agrees well with those of model tests. 4) Upward-widening damage zone, where secondary fractures develop, forms in the handing wall side of high-angle reverse fault at the Kamioka mine. (author)

  12. Maywood Interim Storage Site: Annual site environmental report, Maywood, New Jersey, Calendar year 1986: Formerly Utilized Sites Remedial Action Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1987-06-01

    During 1986, the environmental monitoring program was continued at the Maywood Interim Storage Site (MISS), a US Department of Energy (DOE) facility located in the Borough of Maywood and the Township of Rochelle Park, New Jersey. The MISS is presently used for the storage of low-level radioactively contaminated soils. The MISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP). As part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Appropriations Act, remedial action and environmental monitoring programs are being conducted at this site and at vicinity properties by Bechtel National, Inc., Project Management Contractor for FUSRAP. The monitoring program at the MISS measures thoron and radon gas concentrations in air; external gamma radiation levels; and thorium, uranium, and radium concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard (100 mrem/y) and to assess the potential effect on public health, the radiation dose was calculated for the maximally exposed individual. Based on the conservative scenario described in the report, the maximally exposed individual would receive an annual external exposure approximately equivalent to 1% of the DOE radiation protection standard of 100 mrem/y. This exposure is less than the exposure a person would receive during a round-trip flight from New York to Los Angeles (due to greater amounts of cosmic radiation at higher altitudes). The cumulative dose to the population within an 80-km (50-mi) radius of the MISS that would result from radioactive materials present at the site would be indistinguishable from the dose the same population would receive from naturally occurring radioactive sources. Results of the 1986 monitoring show that the MISS is in compliance with the DOE radiation protection standard. 16 refs., 8 figs., 15 tabs.

  13. Interim and final storage casks

    International Nuclear Information System (INIS)

    Stumpfrock, L.; Kockelmann, H.

    2012-01-01

    The disposal of radioactive waste is a huge social challenge in Germany and all over the world. As is well known the search for a site for a final repository for high-level waste in Germany is not complete. Therefore, interim storage facilities for radioactive waste were built at plant sites in Germany. The waste is stored in these storage facilities in appropriate storage and transport casks until the transport in a final repository can be carried out. Licensing of the storage and transport casks aimed for use in the public space is done according to the traffic laws and for handling in the storage facility according to nuclear law. Taking into account the activity of the waste to be stored, different containers are in use, so that experience is available from the licensing and operation in interim storage facilities. The large volume of radioactive waste to be disposed of after the shut-down of power generation in nuclear power stations makes it necessary for large quantities of licensed storage and transport casks to be provided soon.

  14. Interim storage report

    International Nuclear Information System (INIS)

    Rawlins, J.K.

    1998-02-01

    High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration

  15. Eigenvector of gravity gradient tensor for estimating fault dips considering fault type

    Science.gov (United States)

    Kusumoto, Shigekazu

    2017-12-01

    The dips of boundaries in faults and caldera walls play an important role in understanding their formation mechanisms. The fault dip is a particularly important parameter in numerical simulations for hazard map creation as the fault dip affects estimations of the area of disaster occurrence. In this study, I introduce a technique for estimating the fault dip using the eigenvector of the observed or calculated gravity gradient tensor on a profile and investigating its properties through numerical simulations. From numerical simulations, it was found that the maximum eigenvector of the tensor points to the high-density causative body, and the dip of the maximum eigenvector closely follows the dip of the normal fault. It was also found that the minimum eigenvector of the tensor points to the low-density causative body and that the dip of the minimum eigenvector closely follows the dip of the reverse fault. It was shown that the eigenvector of the gravity gradient tensor for estimating fault dips is determined by fault type. As an application of this technique, I estimated the dip of the Kurehayama Fault located in Toyama, Japan, and obtained a result that corresponded to conventional fault dip estimations by geology and geomorphology. Because the gravity gradient tensor is required for this analysis, I present a technique that estimates the gravity gradient tensor from the gravity anomaly on a profile.

  16. Reverse fault growth and fault interaction with frictional interfaces: insights from analogue models

    Science.gov (United States)

    Bonanno, Emanuele; Bonini, Lorenzo; Basili, Roberto; Toscani, Giovanni; Seno, Silvio

    2017-04-01

    The association of faulting and folding is a common feature in mountain chains, fold-and-thrust belts, and accretionary wedges. Kinematic models are developed and widely used to explain a range of relationships between faulting and folding. However, these models may result not to be completely appropriate to explain shortening in mechanically heterogeneous rock bodies. Weak layers, bedding surfaces, or pre-existing faults placed ahead of a propagating fault tip may influence the fault propagation rate itself and the associated fold shape. In this work, we employed clay analogue models to investigate how mechanical discontinuities affect the propagation rate and the associated fold shape during the growth of reverse master faults. The simulated master faults dip at 30° and 45°, recalling the range of the most frequent dip angles for active reverse faults that occurs in nature. The mechanical discontinuities are simulated by pre-cutting the clay pack. For both experimental setups (30° and 45° dipping faults) we analyzed three different configurations: 1) isotropic, i.e. without precuts; 2) with one precut in the middle of the clay pack; and 3) with two evenly-spaced precuts. To test the repeatability of the processes and to have a statistically valid dataset we replicate each configuration three times. The experiments were monitored by collecting successive snapshots with a high-resolution camera pointing at the side of the model. The pictures were then processed using the Digital Image Correlation method (D.I.C.), in order to extract the displacement and shear-rate fields. These two quantities effectively show both the on-fault and off-fault deformation, indicating the activity along the newly-formed faults and whether and at what stage the discontinuities (precuts) are reactivated. To study the fault propagation and fold shape variability we marked the position of the fault tips and the fold profiles for every successive step of deformation. Then we compared

  17. Fault Current Characteristics of the DFIG under Asymmetrical Fault Conditions

    Directory of Open Access Journals (Sweden)

    Fan Xiao

    2015-09-01

    Full Text Available During non-severe fault conditions, crowbar protection is not activated and the rotor windings of a doubly-fed induction generator (DFIG are excited by the AC/DC/AC converter. Meanwhile, under asymmetrical fault conditions, the electrical variables oscillate at twice the grid frequency in synchronous dq frame. In the engineering practice, notch filters are usually used to extract the positive and negative sequence components. In these cases, the dynamic response of a rotor-side converter (RSC and the notch filters have a large influence on the fault current characteristics of the DFIG. In this paper, the influence of the notch filters on the proportional integral (PI parameters is discussed and the simplified calculation models of the rotor current are established. Then, the dynamic performance of the stator flux linkage under asymmetrical fault conditions is also analyzed. Based on this, the fault characteristics of the stator current under asymmetrical fault conditions are studied and the corresponding analytical expressions of the stator fault current are obtained. Finally, digital simulation results validate the analytical results. The research results are helpful to meet the requirements of a practical short-circuit calculation and the construction of a relaying protection system for the power grid with penetration of DFIGs.

  18. 75 FR 18095 - America's Marine Highway Program

    Science.gov (United States)

    2010-04-09

    ... Marine Highway Transportation. Authority: Energy Independence and Security Act of 2007, Sections 1121...] RIN 2133-AB70 America's Marine Highway Program AGENCY: Maritime Administration, Department of... interim final rule that established America's Marine Highway Program, under which the Secretary will...

  19. ITER interim design report package documents

    International Nuclear Information System (INIS)

    1996-01-01

    This publication contains the Excerpt from the ITER Council (IC-8), the ITER Interim Design Report, Cost Review and Safety Analysis, ITER Site Requirements and ITER Site Design Assumptions and the Excerpt from the ITER Council (IC-9). 8 figs, 2 tabs

  20. Spent fuel interim storage

    International Nuclear Information System (INIS)

    Bilegan, Iosif C.

    2003-01-01

    The official inauguration of the spent fuel interim storage took place on Monday July 28, 2003 at Cernavoda NNP. The inaugural event was attended by local and central public authority representatives, a Canadian Government delegation as well as newsmen from local and central mass media and numerous specialists from Cernavoda NPP compound. Mr Andrei Grigorescu, State Secretary with the Economy and Commerce Ministry, underlined in his talk the importance of this objective for the continuous development of nuclear power in Romania as well as for Romania's complying with the EU practice in this field. Also the excellent collaboration between the Canadian contractor AECL and the Romanian partners Nuclear Montaj, CITON, UTI, General Concret in the accomplishment of this unit at the planned terms and costs. On behalf of Canadian delegation, spoke Minister Don Boudria. He underlined the importance which the Canadian Government affords to the cooperation with Romania aiming at specific objectives in the field of nuclear power such as the Cernavoda NPP Unit 2 and spent fuel interim storage. After traditional cutting of the inaugural ribbon by the two Ministers the festivities continued on the Cernavoda NPP Compound with undersigning the documents regarding the project completion and a press conference

  1. Scissoring Fault Rupture Properties along the Median Tectonic Line Fault Zone, Southwest Japan

    Science.gov (United States)

    Ikeda, M.; Nishizaka, N.; Onishi, K.; Sakamoto, J.; Takahashi, K.

    2017-12-01

    The Median Tectonic Line fault zone (hereinafter MTLFZ) is the longest and most active fault zone in Japan. The MTLFZ is a 400-km-long trench parallel right-lateral strike-slip fault accommodating lateral slip components of the Philippine Sea plate oblique subduction beneath the Eurasian plate [Fitch, 1972; Yeats, 1996]. Complex fault geometry evolves along the MTLFZ. The geomorphic and geological characteristics show a remarkable change through the MTLFZ. Extensional step-overs and pull-apart basins and a pop-up structure develop in western and eastern parts of the MTLFZ, respectively. It is like a "scissoring fault properties". We can point out two main factors to form scissoring fault properties along the MTLFZ. One is a regional stress condition, and another is a preexisting fault. The direction of σ1 anticlockwise rotate from N170°E [Famin et al., 2014] in the eastern Shikoku to Kinki areas and N100°E [Research Group for Crustral Stress in Western Japan, 1980] in central Shikoku to N85°E [Onishi et al., 2016] in western Shikoku. According to the rotation of principal stress directions, the western and eastern parts of the MTLFZ are to be a transtension and compression regime, respectively. The MTLFZ formed as a terrain boundary at Cretaceous, and has evolved with a long active history. The fault style has changed variously, such as left-lateral, thrust, normal and right-lateral. Under the structural condition of a preexisting fault being, the rupture does not completely conform to Anderson's theory for a newly formed fault, as the theory would require either purely dip-slip motion on the 45° dipping fault or strike-slip motion on a vertical fault. The fault rupture of the 2013 Barochistan earthquake in Pakistan is a rare example of large strike-slip reactivation on a relatively low angle dipping fault (thrust fault), though many strike-slip faults have vertical plane generally [Avouac et al., 2014]. In this presentation, we, firstly, show deep subsurface

  2. Effectiveness of interim stage filter in the exhaust system of glove boxes

    International Nuclear Information System (INIS)

    Patre, D.K.; Vangara, H.; Thanamani, S.; Gopalakrishnan, R.K.; Mhatre, Amol M.

    2018-01-01

    All operations in radiochemical laboratories are carried out in containment systems like Glove boxes and Fume hoods. For controlling air contamination two separate air cleaning systems are incorporated. Laboratory has general ventilation system and glove boxes are provided with a negative pressure system (NPS). Glove box exhaust air is passed through three stage filtration systems: in situ, interim and final before discharging to the atmosphere. In addition to the individual HEPA filters of each glove box, there is an interim HEPA filter bank introduced at the laboratory end. This was introduced to reduce a load on main exhaust filter system. Finally the exhaust air is discharged through the final stage HEPA filter located in the filter house through the Stack. The interim HEPA filter bank provides additional protection for the release of particulate activity and reduces load on the final stage filters. In the present work efforts have been put to validate the interim stage filter, which has been introduced, to limit the environmental release

  3. An Active Fault-Tolerant Control Method Ofunmanned Underwater Vehicles with Continuous and Uncertain Faults

    Directory of Open Access Journals (Sweden)

    Daqi Zhu

    2008-11-01

    Full Text Available This paper introduces a novel thruster fault diagnosis and accommodation system for open-frame underwater vehicles with abrupt faults. The proposed system consists of two subsystems: a fault diagnosis subsystem and a fault accommodation sub-system. In the fault diagnosis subsystem a ICMAC(Improved Credit Assignment Cerebellar Model Articulation Controllers neural network is used to realize the on-line fault identification and the weighting matrix computation. The fault accommodation subsystem uses a control algorithm based on weighted pseudo-inverse to find the solution of the control allocation problem. To illustrate the proposed method effective, simulation example, under multi-uncertain abrupt faults, is given in the paper.

  4. Development of a Computer Program for the Analysis Logistics of PWR Spent Fuels

    International Nuclear Information System (INIS)

    Choi, Heui Joo; Choi, Jong Won; Cha, Jeong Hun

    2008-01-01

    It is expected that the temporary storage facilities at the nuclear power plants will be full of the spent fuels within 10 years. Provided that a centralized interim storage facility is constructed along the coast of the Korean peninsula to solve this problem, a substantial amount of spent fuels should be transported by sea or by land every year. In this paper we developed a computer program for the analysis of transportation logistics of the spent fuels from 4 different nuclear power plant sites to the hypothetical centralized interim storage facility and the final repository. Mass balance equations were used to analyze the logistics between the nuclear power plants and the interim storage facility. To this end a computer program, CASK, was developed by using the VISUAL BASIC language. The annual transportation rates of spent fuels from the four nuclear power plant sites were determined by using the CASK program. The parameter study with the program illustrated the easiness of logistics analysis. The program could be used for the cost analysis of the spent fuel transportation as well.

  5. EXPERIMENT BASED FAULT DIAGNOSIS ON BOTTLE FILLING PLANT WITH LVQ ARTIFICIAL NEURAL NETWORK ALGORITHM

    Directory of Open Access Journals (Sweden)

    Mustafa DEMETGÜL

    2008-01-01

    Full Text Available In this study, an artificial neural network is developed to find an error rapidly on pneumatic system. Also the ANN prevents the system versus the failure. The error on the experimental bottle filling plant can be defined without any interference using analog values taken from pressure sensors and linear potentiometers. The sensors and potentiometers are placed on different places of the plant. Neural network diagnosis faults on plant, where no bottle, cap closing cylinder B is not working, bottle cap closing cylinder C is not working, air pressure is not sufficient, water is not filling and low air pressure faults. The fault is diagnosed by artificial neural network with LVQ. It is possible to find an failure by using normal programming or PLC. The reason offing Artificial Neural Network is to give a information where the fault is. However, ANN can be used for different systems. The aim is to find the fault by using ANN simultaneously. In this situation, the error taken place on the pneumatic system is collected by a data acquisition card. It is observed that the algorithm is very capable program for many industrial plants which have mechatronic systems.

  6. Thermal instability and current-voltage scaling in superconducting fault current limiters

    Energy Technology Data Exchange (ETDEWEB)

    Zeimetz, B [Department of Materials Science and Metallurgy, Cambridge University, Pembroke Street, Cambridge CB1 3QZ (United Kingdom); Tadinada, K [Department of Engineering, Cambridge University, Trumpington Road, Cambridge CB2 1PZ (United Kingdom); Eves, D E [Department of Engineering, Cambridge University, Trumpington Road, Cambridge CB2 1PZ (United Kingdom); Coombs, T A [Department of Engineering, Cambridge University, Trumpington Road, Cambridge CB2 1PZ (United Kingdom); Evetts, J E [Department of Materials Science and Metallurgy, Cambridge University, Pembroke Street, Cambridge CB1 3QZ (United Kingdom); Campbell, A M [Department of Engineering, Cambridge University, Trumpington Road, Cambridge CB2 1PZ (United Kingdom)

    2004-04-01

    We have developed a computer model for the simulation of resistive superconducting fault current limiters in three dimensions. The program calculates the electromagnetic and thermal response of a superconductor to a time-dependent overload voltage, with different possible cooling conditions for the surfaces, and locally variable superconducting and thermal properties. We find that the cryogen boil-off parameters critically influence the stability of a limiter. The recovery time after a fault increases strongly with thickness. Above a critical thickness, the temperature is unstable even for a small applied AC voltage. The maximum voltage and maximum current during a short fault are correlated by a simple exponential law.

  7. Information Based Fault Diagnosis

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Poulsen, Niels Kjølstad

    2008-01-01

    Fault detection and isolation, (FDI) of parametric faults in dynamic systems will be considered in this paper. An active fault diagnosis (AFD) approach is applied. The fault diagnosis will be investigated with respect to different information levels from the external inputs to the systems. These ...

  8. Fault Tolerant Feedback Control

    DEFF Research Database (Denmark)

    Stoustrup, Jakob; Niemann, H.

    2001-01-01

    An architecture for fault tolerant feedback controllers based on the Youla parameterization is suggested. It is shown that the Youla parameterization will give a residual vector directly in connection with the fault diagnosis part of the fault tolerant feedback controller. It turns out...... that there is a separation be-tween the feedback controller and the fault tolerant part. The closed loop feedback properties are handled by the nominal feedback controller and the fault tolerant part is handled by the design of the Youla parameter. The design of the fault tolerant part will not affect the design...... of the nominal feedback con-troller....

  9. LANDFILL BIOREACTOR PERFORMANCE, SECOND INTERIM REPORT

    Science.gov (United States)

    A bioreactor landfill is a landfill that is operated in a manner that is expected to increase the rate and extent of waste decomposition, gas generation, and settlement compared to a traditional landfill. This Second Interim Report was prepared to provide an interpretation of fie...

  10. DOE UST interim subsurface barrier technologies workshop

    International Nuclear Information System (INIS)

    1992-09-01

    This document contains information which was presented at a workshop regarding interim subsurface barrier technologies that could be used for underground storage tanks, particularly the tank 241-C-106 at the Hanford Reservation

  11. Data-driven design of fault diagnosis and fault-tolerant control systems

    CERN Document Server

    Ding, Steven X

    2014-01-01

    Data-driven Design of Fault Diagnosis and Fault-tolerant Control Systems presents basic statistical process monitoring, fault diagnosis, and control methods, and introduces advanced data-driven schemes for the design of fault diagnosis and fault-tolerant control systems catering to the needs of dynamic industrial processes. With ever increasing demands for reliability, availability and safety in technical processes and assets, process monitoring and fault-tolerance have become important issues surrounding the design of automatic control systems. This text shows the reader how, thanks to the rapid development of information technology, key techniques of data-driven and statistical process monitoring and control can now become widely used in industrial practice to address these issues. To allow for self-contained study and facilitate implementation in real applications, important mathematical and control theoretical knowledge and tools are included in this book. Major schemes are presented in algorithm form and...

  12. Distributed Fault-Tolerant Control of Networked Uncertain Euler-Lagrange Systems Under Actuator Faults.

    Science.gov (United States)

    Chen, Gang; Song, Yongduan; Lewis, Frank L

    2016-05-03

    This paper investigates the distributed fault-tolerant control problem of networked Euler-Lagrange systems with actuator and communication link faults. An adaptive fault-tolerant cooperative control scheme is proposed to achieve the coordinated tracking control of networked uncertain Lagrange systems on a general directed communication topology, which contains a spanning tree with the root node being the active target system. The proposed algorithm is capable of compensating for the actuator bias fault, the partial loss of effectiveness actuation fault, the communication link fault, the model uncertainty, and the external disturbance simultaneously. The control scheme does not use any fault detection and isolation mechanism to detect, separate, and identify the actuator faults online, which largely reduces the online computation and expedites the responsiveness of the controller. To validate the effectiveness of the proposed method, a test-bed of multiple robot-arm cooperative control system is developed for real-time verification. Experiments on the networked robot-arms are conduced and the results confirm the benefits and the effectiveness of the proposed distributed fault-tolerant control algorithms.

  13. All row, planar fault detection system

    Science.gov (United States)

    Archer, Charles Jens; Pinnow, Kurt Walter; Ratterman, Joseph D; Smith, Brian Edward

    2013-07-23

    An apparatus, program product and method for detecting nodal faults may simultaneously cause designated nodes of a cell to communicate with all nodes adjacent to each of the designated nodes. Furthermore, all nodes along the axes of the designated nodes are made to communicate with their adjacent nodes, and the communications are analyzed to determine if a node or connection is faulty.

  14. A conservative method of retaining an interim obturator for a total maxillectomy patient

    Directory of Open Access Journals (Sweden)

    Nirmal Famila Bettie

    2017-01-01

    Full Text Available Interim obturators are indicated during the postsurgical phases. It promotes surgical healing and serves as a temporary prosthesis to rehabilitate a patient with intra-oral surgical defect. Retention is gained by wiring, surgical suturing, and other noninvasive methods to enable functional rehabilitation and easy replacement with a permanent obturator. Interim obturators serve as an easy guide for replacing with definitive obturators by indicating prosthesis extensions and the required method of retention. A more conservative and noninvasive method of retaining an interim obturator for a maxillectomy patient is described in this case report.

  15. A Conservative Method of Retaining an Interim Obturator for a Total Maxillectomy Patient.

    Science.gov (United States)

    Bettie, Nirmal Famila

    2017-11-01

    Interim obturators are indicated during the postsurgical phases. It promotes surgical healing and serves as a temporary prosthesis to rehabilitate a patient with intra-oral surgical defect. Retention is gained by wiring, surgical suturing, and other noninvasive methods to enable functional rehabilitation and easy replacement with a permanent obturator. Interim obturators serve as an easy guide for replacing with definitive obturators by indicating prosthesis extensions and the required method of retention. A more conservative and noninvasive method of retaining an interim obturator for a maxillectomy patient is described in this case report.

  16. International validation study for interim PET in ABVD-treated, advanced-stage hodgkin lymphoma

    DEFF Research Database (Denmark)

    Biggi, Alberto; Gallamini, Andrea; Chauvie, Stephane

    2013-01-01

    At present, there are no standard criteria that have been validated for interim PET reporting in lymphoma. In 2009, an international workshop attended by hematologists and nuclear medicine experts in Deauville, France, proposed to develop simple and reproducible rules for interim PET reporting...... in lymphoma. Accordingly, an international validation study was undertaken with the primary aim of validating the prognostic role of interim PET using the Deauville 5-point score to evaluate images and with the secondary aim of measuring concordance rates among reviewers using the same 5-point score...

  17. Uranium exploration of the Colorado Plateau: interim staff report

    International Nuclear Information System (INIS)

    1980-10-01

    This report is an issue of the original draft copy of the Interim Staff Report on Uranium Exploration on the Colorado Plateau, dated June 1951. The original draft copy was only recently located and is being published at this time because of the interest in the contained historical content. The table of contents of this report lists: history of uranium mining; geology; proposed program for the geologic investigations section; general activities of industry and government; and future exploration of sedimentary uranium deposits and anticipated results. Under the proposed program section are: future of the copper-uranium deposits as a source of uranium; uraniferous asphaltite deposits; and commission exploration and future possibilities. The section on general activities of industry and government includes: exploratory and development drilling; field investigations and mapping; early geologic investigations and investigations by the US geological survey; and geophysical exploration. Tables are also presented on: uranium production by districts; US Geological survey drilling statistics; Colorado Exploration Branch drilling statistics; summary of drilling projects; and comparative yearly core-drill statistics on the Colorado Plateau

  18. Fault-tolerant Control of Unmanned Underwater Vehicles with Continuous Faults: Simulations and Experiments

    Directory of Open Access Journals (Sweden)

    Qian Liu

    2010-02-01

    Full Text Available A novel thruster fault diagnosis and accommodation method for open-frame underwater vehicles is presented in the paper. The proposed system consists of two units: a fault diagnosis unit and a fault accommodation unit. In the fault diagnosis unit an ICMAC (Improved Credit Assignment Cerebellar Model Articulation Controllers neural network information fusion model is used to realize the fault identification of the thruster. The fault accommodation unit is based on direct calculations of moment and the result of fault identification is used to find the solution of the control allocation problem. The approach resolves the continuous faulty identification of the UV. Results from the experiment are provided to illustrate the performance of the proposed method in uncertain continuous faulty situation.

  19. Fault-tolerant Control of Unmanned Underwater Vehicles with Continuous Faults: Simulations and Experiments

    Directory of Open Access Journals (Sweden)

    Qian Liu

    2009-12-01

    Full Text Available A novel thruster fault diagnosis and accommodation method for open-frame underwater vehicles is presented in the paper. The proposed system consists of two units: a fault diagnosis unit and a fault accommodation unit. In the fault diagnosis unit an ICMAC (Improved Credit Assignment Cerebellar Model Articulation Controllers neural network information fusion model is used to realize the fault identification of the thruster. The fault accommodation unit is based on direct calculations of moment and the result of fault identification is used to find the solution of the control allocation problem. The approach resolves the continuous faulty identification of the UV. Results from the experiment are provided to illustrate the performance of the proposed method in uncertain continuous faulty situation.

  20. 78 FR 41125 - Interim Enforcement Policy for Permanent Implant Brachytherapy Medical Event Reporting

    Science.gov (United States)

    2013-07-09

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0114] Interim Enforcement Policy for Permanent Implant Brachytherapy Medical Event Reporting AGENCY: Nuclear Regulatory Commission. ACTION: Policy statement; revision. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing an interim Enforcement Policy that allows...

  1. Predictive probability methods for interim monitoring in clinical trials with longitudinal outcomes.

    Science.gov (United States)

    Zhou, Ming; Tang, Qi; Lang, Lixin; Xing, Jun; Tatsuoka, Kay

    2018-04-17

    In clinical research and development, interim monitoring is critical for better decision-making and minimizing the risk of exposing patients to possible ineffective therapies. For interim futility or efficacy monitoring, predictive probability methods are widely adopted in practice. Those methods have been well studied for univariate variables. However, for longitudinal studies, predictive probability methods using univariate information from only completers may not be most efficient, and data from on-going subjects can be utilized to improve efficiency. On the other hand, leveraging information from on-going subjects could allow an interim analysis to be potentially conducted once a sufficient number of subjects reach an earlier time point. For longitudinal outcomes, we derive closed-form formulas for predictive probabilities, including Bayesian predictive probability, predictive power, and conditional power and also give closed-form solutions for predictive probability of success in a future trial and the predictive probability of success of the best dose. When predictive probabilities are used for interim monitoring, we study their distributions and discuss their analytical cutoff values or stopping boundaries that have desired operating characteristics. We show that predictive probabilities utilizing all longitudinal information are more efficient for interim monitoring than that using information from completers only. To illustrate their practical application for longitudinal data, we analyze 2 real data examples from clinical trials. Copyright © 2018 John Wiley & Sons, Ltd.

  2. Pathways to deep decarbonization - Interim 2014 Report

    International Nuclear Information System (INIS)

    2014-01-01

    The interim 2014 report by the Deep Decarbonization Pathways Project (DDPP), coordinated and published by IDDRI and the Sustainable Development Solutions Network (SDSN), presents preliminary findings of the pathways developed by the DDPP Country Research Teams with the objective of achieving emission reductions consistent with limiting global warming to less than 2 deg. C. The DDPP is a knowledge network comprising 15 Country Research Teams and several Partner Organizations who develop and share methods, assumptions, and findings related to deep decarbonization. Each DDPP Country Research Team has developed an illustrative road-map for the transition to a low-carbon economy, with the intent of taking into account national socio-economic conditions, development aspirations, infrastructure stocks, resource endowments, and other relevant factors. The interim 2014 report focuses on technically feasible pathways to deep decarbonization

  3. The Impact of TCSC on IDMT Relays in SLG Fault in Distribution Networks

    Directory of Open Access Journals (Sweden)

    Lazhar Bougouffa

    2016-03-01

    Full Text Available IDMT Directional Over-Current Relays protection is one of the basic protective relaying for distribution systems, for fault detection and clearing as soon as possible. Its function would generally be changed in presence of FACTS devices. In this paper a study to investigate the direct effect of varying reactance of the TCSC on single-line-to-ground (SLG fault in compensated distribution systems. This paper, therefore presents the calculation of fault component, and directional over-current relay operating time characteristics for phase-to-earth fault involving the TCSC. The case study is compared between compensated and uncompensated system. The coordination of the relays is a nonlinear programming problem and it is solved by using MATLAB software.

  4. Study on active faults in the Izu Peninsula using α track etch method

    International Nuclear Information System (INIS)

    Katoh, K.; Ikeda, K.; Takahashi, M.; Nagata, S.; Yanagihara, C.

    1981-01-01

    The α track etch method, which is one of the geochemical survey methods for the mapping and detection of active faults and the evaluation of their activities, has been applied to ten sites for the purpose of the earthquake prediction research program. The method conventionally measures relative radon concentration in the soil gas by counting the number of tracks per cm 2 .day on a small piece of plastic film (cellulose nitrate) which is sensitive to α-ray radiation. As the result of the track measurement on many survey lines crossing ten active faults including earthquake faults in the Izu Peninsula, the following was clarified: 1. The peak of track number appears mostly on fault lines but sometimes shifts from it. The line connecting peaks on the several survey lines corresponds to the strike of fault. 2. Relative position between the peak and the fault line on the surface suggests the type of fault, normal or reverse. 3. The track number observed on thin Quaternary strata is generally larger than that on thick Quaternary strata at an active fault concerned. This fact shows that the rising time of radon gas is controlled by the thickness of covering strata. (author)

  5. Senior Program Officer, Evaluation | IDRC - International ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... provides technical assistance to program staff and partners on evaluation ... monitoring and evaluation approaches; working with colleagues to maintain the ... provides technical supervision and assistance, including analysis of interim ...

  6. Faults Images

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Through the study of faults and their effects, much can be learned about the size and recurrence intervals of earthquakes. Faults also teach us about crustal...

  7. Insurance Applications of Active Fault Maps Showing Epistemic Uncertainty

    Science.gov (United States)

    Woo, G.

    2005-12-01

    Insurance loss modeling for earthquakes utilizes available maps of active faulting produced by geoscientists. All such maps are subject to uncertainty, arising from lack of knowledge of fault geometry and rupture history. Field work to undertake geological fault investigations drains human and monetary resources, and this inevitably limits the resolution of fault parameters. Some areas are more accessible than others; some may be of greater social or economic importance than others; some areas may be investigated more rapidly or diligently than others; or funding restrictions may have curtailed the extent of the fault mapping program. In contrast with the aleatory uncertainty associated with the inherent variability in the dynamics of earthquake fault rupture, uncertainty associated with lack of knowledge of fault geometry and rupture history is epistemic. The extent of this epistemic uncertainty may vary substantially from one regional or national fault map to another. However aware the local cartographer may be, this uncertainty is generally not conveyed in detail to the international map user. For example, an area may be left blank for a variety of reasons, ranging from lack of sufficient investigation of a fault to lack of convincing evidence of activity. Epistemic uncertainty in fault parameters is of concern in any probabilistic assessment of seismic hazard, not least in insurance earthquake risk applications. A logic-tree framework is appropriate for incorporating epistemic uncertainty. Some insurance contracts cover specific high-value properties or transport infrastructure, and therefore are extremely sensitive to the geometry of active faulting. Alternative Risk Transfer (ART) to the capital markets may also be considered. In order for such insurance or ART contracts to be properly priced, uncertainty should be taken into account. Accordingly, an estimate is needed for the likelihood of surface rupture capable of causing severe damage. Especially where a

  8. 33 CFR 385.38 - Interim goals.

    Science.gov (United States)

    2010-07-01

    ..., monitoring and assessment; (ii) Be provided to the independent scientific review panel established in.... The interim goals shall be developed through the use of appropriate models and tools and shall provide... to be required to meet long-term hydrological and ecological restoration goals, based on best...

  9. Interim guidelines for protecting fire-fighting personnel from multiple hazards at nuclear plant sites

    International Nuclear Information System (INIS)

    Klein, A.R.; Bloom, C.W.

    1989-07-01

    This report provides interim guidelines for reducing the impact to fire fighting and other supporting emergency response personnel from the multiple hazards of radiation, heat stress, and trauma when fighting a fire in a United States commercial nuclear power plant. Interim guidelines are provided for fire brigade composition, training, equipment, procedures, strategies, heat stress and trauma. In addition, task definitions are provided to evaluate and further enhance the interim guidelines over the long term. 19 refs

  10. A Design Method for Fault Reconfiguration and Fault-Tolerant Control of a Servo Motor

    Directory of Open Access Journals (Sweden)

    Jing He

    2013-01-01

    Full Text Available A design scheme that integrates fault reconfiguration and fault-tolerant position control is proposed for a nonlinear servo system with friction. Analysis of the non-linear friction torque and fault in the system is used to guide design of a sliding mode position controller. A sliding mode observer is designed to achieve fault reconfiguration based on the equivalence principle. Thus, active fault-tolerant position control of the system can be realized. A real-time simulation experiment is performed on a hardware-in-loop simulation platform. The results show that the system reconfigures well for both incipient and abrupt faults. Under the fault-tolerant control mechanism, the output signal for the system position can rapidly track given values without being influenced by faults.

  11. Active Fault Isolation in MIMO Systems

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Poulsen, Niels Kjølstad

    2014-01-01

    isolation is based directly on the input/output s ignals applied for the fault detection. It is guaranteed that the fault group includes the fault that had occurred in the system. The second step is individual fault isolation in the fault group . Both types of isolation are obtained by applying dedicated......Active fault isolation of parametric faults in closed-loop MIMO system s are considered in this paper. The fault isolation consists of two steps. T he first step is group- wise fault isolation. Here, a group of faults is isolated from other pos sible faults in the system. The group-wise fault...

  12. Fault Features Extraction and Identification based Rolling Bearing Fault Diagnosis

    International Nuclear Information System (INIS)

    Qin, B; Sun, G D; Zhang L Y; Wang J G; HU, J

    2017-01-01

    For the fault classification model based on extreme learning machine (ELM), the diagnosis accuracy and stability of rolling bearing is greatly influenced by a critical parameter, which is the number of nodes in hidden layer of ELM. An adaptive adjustment strategy is proposed based on vibrational mode decomposition, permutation entropy, and nuclear kernel extreme learning machine to determine the tunable parameter. First, the vibration signals are measured and then decomposed into different fault feature models based on variation mode decomposition. Then, fault feature of each model is formed to a high dimensional feature vector set based on permutation entropy. Second, the ELM output function is expressed by the inner product of Gauss kernel function to adaptively determine the number of hidden layer nodes. Finally, the high dimension feature vector set is used as the input to establish the kernel ELM rolling bearing fault classification model, and the classification and identification of different fault states of rolling bearings are carried out. In comparison with the fault classification methods based on support vector machine and ELM, the experimental results show that the proposed method has higher classification accuracy and better generalization ability. (paper)

  13. Environmental surveillance results for 1995 for the Hazelwood Interim Storage Site

    International Nuclear Information System (INIS)

    McCague, J.C.

    1996-01-01

    This memorandum presents and interprets analytical results and measurements obtained as part of the 1995 environmental surveillance program for the Hazelwood Interim Storage Site (HISS) under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The discussion provides a comparative analysis of average historical background conditions and applicable regulatory criteria to the 1995 results reported for external gamma radiation and for samples from the media investigated (air, surface water, sediment, groundwater, and stormwater). Results from the 1995 environmental surveillance program at HISS indicate that, with the exception of thorium-230 in streambed sediment, applicable US Department of Energy (DOE) guidelines were not exceeded for any measured parameter or for any dose calculated for potentially exposed members of the general public. In the absence of sediment guidelines, DOE soil guidelines serve as a standard of comparison for data obtained from stream bed sediment; two samples from downstream locations contained concentrations of thorium-230 that exceeded DOE soil guidelines. All stormwater sample results were in compliance with permit-specified limits. Other radioactive materials include radium 226 and natural uranium

  14. Guaranteed Cost Fault-Tolerant Control for Networked Control Systems with Sensor Faults

    Directory of Open Access Journals (Sweden)

    Qixin Zhu

    2015-01-01

    Full Text Available For the large scale and complicated structure of networked control systems, time-varying sensor faults could inevitably occur when the system works in a poor environment. Guaranteed cost fault-tolerant controller for the new networked control systems with time-varying sensor faults is designed in this paper. Based on time delay of the network transmission environment, the networked control systems with sensor faults are modeled as a discrete-time system with uncertain parameters. And the model of networked control systems is related to the boundary values of the sensor faults. Moreover, using Lyapunov stability theory and linear matrix inequalities (LMI approach, the guaranteed cost fault-tolerant controller is verified to render such networked control systems asymptotically stable. Finally, simulations are included to demonstrate the theoretical results.

  15. ASPECTS CONCERNING INTERIM FINANCIAL REPORTING IN ROMANIA: STANDARDS AND REGULATIONS

    Directory of Open Access Journals (Sweden)

    Aristita Rotila

    2014-12-01

    Full Text Available The mechanisms employed for the communication of accounting information that is necessary for users in their economic decision-making process consist of the financial statements of an entity. All legal entities, no matter the domain of their activity, have the obligation to draw up annual financial statements for every completed financial year. For certain categories of entities, reporting obligations are also required for periods other than the annual reporting, throughout the financial year. It is the case of interim financial reporting. At the level of the international accounting framework, the aspects related to interim financial reporting are the subject of a separate standard, namely, IAS 34 Interim Financial Reporting. In Romania, the current system of accounting regulations concerning the annual financial statements comprises accounting regulations that comply with the European directives and which apply to the various categories of entities, on the one hand and, on the other, accounting regulations in line with the IFRS, which are applicable to other classes of entities from certain activity sectors. The accounting regulations that apply to each category refer to, among other things, the contents and the format of financial statements that have to be presented. Analysing the system of norms and regulations, this article identifies the requirements concerning interim financial reporting in Romania, with reference to the different types of entities.

  16. Interim data quality objectives for waste pretreatment and vitrification. Revision 1

    International Nuclear Information System (INIS)

    Kupfer, M.J.; Conner, J.M.; Kirkbride, R.A.; Mobley, J.R.

    1994-01-01

    The Tank Waste Remediation System (TWRS) is responsible for storing, processing, and immobilizing the Hanford Site tank wastes. Characterization information on the tank wastes is needed so that safety concerns can be addressed, and retrieval, pretreatment, and immobilization processes can be designed, permitted, and implemented. This document describes the near-term tank waste sampling and characterization needs of the Pretreatment, High-Level Waste (HLW) Disposal, and Low-Level Waste (LLW) Disposal Programs to support the TWRS disposal mission. The final DQO (Data Quality Objective) will define specific waste tanks to be sampled, sample timing requirements, an appropriate analytical scheme, and a list of required analytes. This interim DQO, however, focuses primarily on the required analytes since the tanks to be sampled in FY 1994 and early FY 1995 are being driven most heavily by other considerations, particularly safety. The major objective of this Interim DQO is to provide guidance for tank waste characterization requirements for samples taken before completion of the final DQO. The characterization data needs defined herein will support the final DQO to help perform the following: Support the TWRS technical strategy by identification of the chemical and physical composition of the waste in the tanks and Guide development efforts to define waste pretreatment processes, which will in turn define HLW and LLW feed to vitrification processes

  17. Taking interim actions: Integrating CERCLA and NEPA to move ahead with site cleanup

    International Nuclear Information System (INIS)

    MacDonell, M.M.; Peterson, J.M.; Valett, G.L.; McCracken, S.H.

    1991-01-01

    The cleanup of contaminated sites can be expedited by using interim response actions in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). In fact, a major portion of some Superfund sites can be cleaned up using interim actions. For CERCLA sites being remediated by the US Department of Energy (DOE), such actions must also comply with the National Environmental Policy Act (NEPA) because the DOE has established a policy for integrating CERCLA and NEPA requirements. A strategy for the integrated documentation with implementation of interim actions has been applied successfully at the Weldon Spring site, and major cleanup projects are currently underway. This paper discusses some of the issues associated with integrating CERCLA and NEPA for interim actions and summarizes those actions that have been identified for the Weldon Spring site

  18. Taking interim actions: Integrating CERCLA and NEPA to move ahead with site cleanup

    International Nuclear Information System (INIS)

    MacDonell, M.M.; Peterson, J.M.; Valett, G.L.; McCracken, S.H.

    1991-01-01

    The cleanup of contaminated sites can be expedited by using interim response actions in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). In fact, a major portion of some Superfund sites can be cleaned up using interim actions. For CERCLA sites being remediated by the US Department of Energy (DOE), such actions must also comply with the National Environmental Policy Act (NEPA) because the DOE has established a policy for integrating CERCLA and NEPA requirements. A strategy for the integrated documentation and implementation of interim actions has been applied successfully at the Weldon Spring site, and major cleanup projects are currently underway. This paper discusses some of the issues associated with integrating CERCLA and NEPA for interim actions and summarizes those actions that have been identified for the Weldon Spring site

  19. Homogeneity of small-scale earthquake faulting, stress, and fault strength

    Science.gov (United States)

    Hardebeck, J.L.

    2006-01-01

    Small-scale faulting at seismogenic depths in the crust appears to be more homogeneous than previously thought. I study three new high-quality focal-mechanism datasets of small (M angular difference between their focal mechanisms. Closely spaced earthquakes (interhypocentral distance faults of many orientations may or may not be present, only similarly oriented fault planes produce earthquakes contemporaneously. On these short length scales, the crustal stress orientation and fault strength (coefficient of friction) are inferred to be homogeneous as well, to produce such similar earthquakes. Over larger length scales (???2-50 km), focal mechanisms become more diverse with increasing interhypocentral distance (differing on average by 40-70??). Mechanism variability on ???2- to 50 km length scales can be explained by ralatively small variations (???30%) in stress or fault strength. It is possible that most of this small apparent heterogeneity in stress of strength comes from measurement error in the focal mechanisms, as negligibble variation in stress or fault strength (<10%) is needed if each earthquake is assigned the optimally oriented focal mechanism within the 1-sigma confidence region. This local homogeneity in stress orientation and fault strength is encouraging, implying it may be possible to measure these parameters with enough precision to be useful in studying and modeling large earthquakes.

  20. Vipava fault (Slovenia

    Directory of Open Access Journals (Sweden)

    Ladislav Placer

    2008-06-01

    Full Text Available During mapping of the already accomplished Razdrto – Senožeče section of motorway and geologic surveying of construction operations of the trunk road between Razdrto and Vipava in northwestern part of External Dinarides on the southwestern slope of Mt. Nanos, called Rebrnice, a steep NW-SE striking fault was recognized, situated between the Predjama and the Ra{a faults. The fault was named Vipava fault after the Vipava town. An analysis of subrecent gravitational slips at Rebrnice indicates that they were probably associated with the activity of this fault. Unpublished results of a repeated levelling line along the regional road passing across the Vipava fault zone suggest its possible present activity. It would be meaningful to verify this by appropriate geodetic measurements, and to study the actual gravitational slips at Rebrnice. The association between tectonics and gravitational slips in this and in similar extreme cases in the areas of Alps and Dinarides points at the need of complex studying of geologic proceses.

  1. 19 CFR 354.8 - Interim sanctions.

    Science.gov (United States)

    2010-04-01

    ... reconsider imposition of interim sanctions on the basis of new and material evidence or other good cause... Secretary may petition a presiding official to impose such sanctions. (b) The presiding official may impose... person to return material previously provided by the Department and all other materials containing the...

  2. Nuclear power plant pressurizer fault diagnosis using fuzzy signed-digraph and spurious faults elimination methods

    International Nuclear Information System (INIS)

    Park, Joo Hyun

    1994-02-01

    In this work, the Fuzzy Signed Digraph(FSD) method which has been researched for the fault diagnosis of industrial process plant systems is improved and applied to the fault diagnosis of the Kori-2 nuclear power plant pressurizer. A method for spurious faults elimination is also suggested and applied to the fault diagnosis. By using these methods, we could diagnose the multi-faults of the pressurizer and could also eliminate the spurious faults of the pressurizer caused by other subsystems. Besides the multi-fault diagnosis and system-wide diagnosis capabilities, the proposed method has many merits such as real-time diagnosis capability, independency of fault pattern, direct use of sensor values, and transparency of the fault propagation to the operators

  3. Nuclear power plant pressurizer fault diagnosis using fuzzy signed-digraph and spurious faults elimination methods

    International Nuclear Information System (INIS)

    Park, Joo Hyun; Seong, Poong Hyun

    1994-01-01

    In this work, the Fuzzy Signed Digraph (FSD) method which has been researched for the fault diagnosis of industrial process plant systems is improved and applied to the fault diagnosis of the Kori-2 nuclear power plant pressurizer. A method for spurious faults elimination is also suggested and applied to the fault diagnosis. By using these methods, we could diagnose the multi-faults of the pressurizer and could also eliminate the spurious faults of the pressurizer caused by other subsystems. Besides the multi-fault diagnosis and system-wide diagnosis capabilities, the proposed method has many merits such as real-time diagnosis capability, independency of fault pattern, direct use of sensor values, and transparency of the fault propagation to the operators. (Author)

  4. Wayne Interim Storage Site annual environmental report for calendar year 1991, Wayne, New Jersey

    International Nuclear Information System (INIS)

    1992-09-01

    This document describes the envirormental monitoring program at the Wayne Interim Storage Site (WISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of WISS and surrounding area began in 1984 when Congress added the site to the US Department of Energy's (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. WISS is a National Priorities List site. The environmental monitoring program at WISS includes sampling networks for radon and thoron concentrations in air; external gamma radiation exposure; and radium-226, radium-228, thorium-232, and total uranium concentrations in surface water, sediment, and groundwater. Several nonradiological parameters are also measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides, dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment

  5. Compilation of interim technical research memoranda. Volume I

    International Nuclear Information System (INIS)

    Shanahan, W.R.

    1984-04-01

    Four interim technical research memoranda are presented that describe the results of numerical simulations designed to investigate the dynamics of energetic plasma beams propagating across magnetic fields

  6. Diagnosis and fault-tolerant control

    CERN Document Server

    Blanke, Mogens; Lunze, Jan; Staroswiecki, Marcel

    2016-01-01

    Fault-tolerant control aims at a gradual shutdown response in automated systems when faults occur. It satisfies the industrial demand for enhanced availability and safety, in contrast to traditional reactions to faults, which bring about sudden shutdowns and loss of availability. The book presents effective model-based analysis and design methods for fault diagnosis and fault-tolerant control. Architectural and structural models are used to analyse the propagation of the fault through the process, to test the fault detectability and to find the redundancies in the process that can be used to ensure fault tolerance. It also introduces design methods suitable for diagnostic systems and fault-tolerant controllers for continuous processes that are described by analytical models of discrete-event systems represented by automata. The book is suitable for engineering students, engineers in industry and researchers who wish to get an overview of the variety of approaches to process diagnosis and fault-tolerant contro...

  7. Optimal design of superconducting fault detector for superconductor triggered fault current limiters

    International Nuclear Information System (INIS)

    Yim, S.-W.; Kim, H.-R.; Hyun, O.-B.; Sim, J.; Park, K.B.; Lee, B.W.

    2008-01-01

    We have designed and tested a superconducting fault detector (SFD) for a 22.9 kV superconductor triggered fault current limiters (STFCLs) using Au/YBCO thin films. The SFD is to detect a fault and commutate the current from the primary path to the secondary path of the STFCL. First, quench characteristics of the Au/YBCO thin films were investigated for various faults having different fault duration. The rated voltage of the Au/YBCO thin films was determined from the results, considering the stability of the Au/YBCO elements. Second, the recovery time to superconductivity after quench was measured in each fault case. In addition, the dependence of the recovery characteristics on numbers and dimension of Au/YBCO elements were investigated. Based on the results, a SFD was designed, fabricated and tested. The SFD successfully detected a fault current and carried out the line commutation. Its recovery time was confirmed to be less than 0.5 s, satisfying the reclosing scheme in the Korea Electric Power Corporation (KEPCO)'s power grid

  8. Off-fault tip splay networks: a genetic and generic property of faults indicative of their long-term propagation, and a major component of off-fault damage

    Science.gov (United States)

    Perrin, C.; Manighetti, I.; Gaudemer, Y.

    2015-12-01

    Faults grow over the long-term by accumulating displacement and lengthening, i.e., propagating laterally. We use fault maps and fault propagation evidences available in literature to examine geometrical relations between parent faults and off-fault splays. The population includes 47 worldwide crustal faults with lengths from millimeters to thousands of kilometers and of different slip modes. We show that fault splays form adjacent to any propagating fault tip, whereas they are absent at non-propagating fault ends. Independent of parent fault length, slip mode, context, etc, tip splay networks have a similar fan shape widening in direction of long-term propagation, a similar relative length and width (~30 and ~10 % of parent fault length, respectively), and a similar range of mean angles to parent fault (10-20°). Tip splays more commonly develop on one side only of the parent fault. We infer that tip splay networks are a genetic and a generic property of faults indicative of their long-term propagation. We suggest that they represent the most recent damage off-the parent fault, formed during the most recent phase of fault lengthening. The scaling relation between parent fault length and width of tip splay network implies that damage zones enlarge as parent fault length increases. Elastic properties of host rocks might thus be modified at large distances away from a fault, up to 10% of its length. During an earthquake, a significant fraction of coseismic slip and stress is dissipated into the permanent damage zone that surrounds the causative fault. We infer that coseismic dissipation might occur away from a rupture zone as far as a distance of 10% of the length of its causative fault. Coseismic deformations and stress transfers might thus be significant in broad regions about principal rupture traces. This work has been published in Comptes Rendus Geoscience under doi:10.1016/j.crte.2015.05.002 (http://www.sciencedirect.com/science/article/pii/S1631071315000528).

  9. Data-based fault-tolerant control for affine nonlinear systems with actuator faults.

    Science.gov (United States)

    Xie, Chun-Hua; Yang, Guang-Hong

    2016-09-01

    This paper investigates the fault-tolerant control (FTC) problem for unknown nonlinear systems with actuator faults including stuck, outage, bias and loss of effectiveness. The upper bounds of stuck faults, bias faults and loss of effectiveness faults are unknown. A new data-based FTC scheme is proposed. It consists of the online estimations of the bounds and a state-dependent function. The estimations are adjusted online to compensate automatically the actuator faults. The state-dependent function solved by using real system data helps to stabilize the system. Furthermore, all signals in the resulting closed-loop system are uniformly bounded and the states converge asymptotically to zero. Compared with the existing results, the proposed approach is data-based. Finally, two simulation examples are provided to show the effectiveness of the proposed approach. Copyright © 2016 ISA. Published by Elsevier Ltd. All rights reserved.

  10. Implementation of a research prototype onboard fault monitoring and diagnosis system

    Science.gov (United States)

    Palmer, Michael T.; Abbott, Kathy H.; Schutte, Paul C.; Ricks, Wendell R.

    1987-01-01

    Due to the dynamic and complex nature of in-flight fault monitoring and diagnosis, a research effort was undertaken at NASA Langley Research Center to investigate the application of artificial intelligence techniques for improved situational awareness. Under this research effort, concepts were developed and a software architecture was designed to address the complexities of onboard monitoring and diagnosis. This paper describes the implementation of these concepts in a computer program called FaultFinder. The implementation of the monitoring, diagnosis, and interface functions as separate modules is discussed, as well as the blackboard designed for the communication of these modules. Some related issues concerning the future installation of FaultFinder in an aircraft are also discussed.

  11. RECENT GEODYNAMICS OF FAULT ZONES: FAULTING IN REAL TIME SCALE

    Directory of Open Access Journals (Sweden)

    Yu. O. Kuzmin

    2014-01-01

    Full Text Available Recent deformation processes taking place in real time are analyzed on the basis of data on fault zones which were collected by long-term detailed geodetic survey studies with application of field methods and satellite monitoring.A new category of recent crustal movements is described and termed as parametrically induced tectonic strain in fault zones. It is shown that in the fault zones located in seismically active and aseismic regions, super intensive displacements of the crust (5 to 7 cm per year, i.e. (5 to 7·10–5 per year occur due to very small external impacts of natural or technogenic / industrial origin.The spatial discreteness of anomalous deformation processes is established along the strike of the regional Rechitsky fault in the Pripyat basin. It is concluded that recent anomalous activity of the fault zones needs to be taken into account in defining regional regularities of geodynamic processes on the basis of real-time measurements.The paper presents results of analyses of data collected by long-term (20 to 50 years geodetic surveys in highly seismically active regions of Kopetdag, Kamchatka and California. It is evidenced by instrumental geodetic measurements of recent vertical and horizontal displacements in fault zones that deformations are ‘paradoxically’ deviating from the inherited movements of the past geological periods.In terms of the recent geodynamics, the ‘paradoxes’ of high and low strain velocities are related to a reliable empirical fact of the presence of extremely high local velocities of deformations in the fault zones (about 10–5 per year and above, which take place at the background of slow regional deformations which velocities are lower by the order of 2 to 3. Very low average annual velocities of horizontal deformation are recorded in the seismic regions of Kopetdag and Kamchatka and in the San Andreas fault zone; they amount to only 3 to 5 amplitudes of the earth tidal deformations per year.A ‘fault

  12. Fault-tolerant computing systems

    International Nuclear Information System (INIS)

    Dal Cin, M.; Hohl, W.

    1991-01-01

    Tests, Diagnosis and Fault Treatment were chosen as the guiding themes of the conference. However, the scope of the conference included reliability, availability, safety and security issues in software and hardware systems as well. The sessions were organized for the conference which was completed by an industrial presentation: Keynote Address, Reconfiguration and Recover, System Level Diagnosis, Voting and Agreement, Testing, Fault-Tolerant Circuits, Array Testing, Modelling, Applied Fault Tolerance, Fault-Tolerant Arrays and Systems, Interconnection Networks, Fault-Tolerant Software. One paper has been indexed separately in the database. (orig./HP)

  13. Reliability of Measured Data for pH Sensor Arrays with Fault Diagnosis and Data Fusion Based on LabVIEW

    OpenAIRE

    Liao, Yi-Hung; Chou, Jung-Chuan; Lin, Chin-Yi

    2013-01-01

    Fault diagnosis (FD) and data fusion (DF) technologies implemented in the LabVIEW program were used for a ruthenium dioxide pH sensor array. The purpose of the fault diagnosis and data fusion technologies is to increase the reliability of measured data. Data fusion is a very useful statistical method used for sensor arrays in many fields. Fault diagnosis is used to avoid sensor faults and to measure errors in the electrochemical measurement system, therefore, in this study, we use fault diagn...

  14. Active Fault-Tolerant Control for Wind Turbine with Simultaneous Actuator and Sensor Faults

    Directory of Open Access Journals (Sweden)

    Lei Wang

    2017-01-01

    Full Text Available The purpose of this paper is to show a novel fault-tolerant tracking control (FTC strategy with robust fault estimation and compensating for simultaneous actuator sensor faults. Based on the framework of fault-tolerant control, developing an FTC design method for wind turbines is a challenge and, thus, they can tolerate simultaneous pitch actuator and pitch sensor faults having bounded first time derivatives. The paper’s key contribution is proposing a descriptor sliding mode method, in which for establishing a novel augmented descriptor system, with which we can estimate the state of system and reconstruct fault by designing descriptor sliding mode observer, the paper introduces an auxiliary descriptor state vector composed by a system state vector, actuator fault vector, and sensor fault vector. By the optimized method of LMI, the conditions for stability that estimated error dynamics are set up to promote the determination of the parameters designed. With this estimation, and designing a fault-tolerant controller, the system’s stability can be maintained. The effectiveness of the design strategy is verified by implementing the controller in the National Renewable Energy Laboratory’s 5-MW nonlinear, high-fidelity wind turbine model (FAST and simulating it in MATLAB/Simulink.

  15. Study of expert system of fault diagnosis for nuclear power plant

    International Nuclear Information System (INIS)

    Chen Zhihui; Xia Hong; Liu Miao

    2005-01-01

    Based on the fault features of Nuclear Power Plant, the ES (expert system) of fault diagnosis has been programmed. The knowledge in the ES adopts the production systems, which can express the certain and uncertain knowledge. For certain knowledge, the simple reasoning mechanism of prepositional logic is adopted. For the uncertain knowledge, CF (certain factor) is used to express the uncertain, thus to set up the reasoning mechanism. In order to solve the 'bottleneck' problem for knowledge acquisition, rough set theory is incorporated into the fault diagnose system and the reduction algorithm based on the discernibility matrix is improved. In the improved algorithm, the measure of attribute importance first calculate the attribute which have the same value in the same decision-sort, then calculate the degrees of attribute in the discernibility matrix. Several different faults have been diagnosed on some emulator with this expert system. (authors)

  16. The San Andreas Fault and a Strike-slip Fault on Europa

    Science.gov (United States)

    1998-01-01

    The mosaic on the right of the south polar region of Jupiter's moon Europa shows the northern 290 kilometers (180 miles) of a strike-slip fault named Astypalaea Linea. The entire fault is about 810 kilometers (500 miles) long, the size of the California portion of the San Andreas fault on Earth which runs from the California-Mexico border north to the San Francisco Bay. The left mosaic shows the portion of the San Andreas fault near California's san Francisco Bay that has been scaled to the same size and resolution as the Europa image. Each covers an area approximately 170 by 193 kilometers(105 by 120 miles). The red line marks the once active central crack of the Europan fault (right) and the line of the San Andreas fault (left). A strike-slip fault is one in which two crustal blocks move horizontally past one another, similar to two opposing lanes of traffic. The overall motion along the Europan fault seems to have followed a continuous narrow crack along the entire length of the feature, with a path resembling stepson a staircase crossing zones which have been pulled apart. The images show that about 50 kilometers (30 miles) of displacement have taken place along the fault. Opposite sides of the fault can be reconstructed like a puzzle, matching the shape of the sides as well as older individual cracks and ridges that had been broken by its movements. Bends in the Europan fault have allowed the surface to be pulled apart. This pulling-apart along the fault's bends created openings through which warmer, softer ice from below Europa's brittle ice shell surface, or frozen water from a possible subsurface ocean, could reach the surface. This upwelling of material formed large areas of new ice within the boundaries of the original fault. A similar pulling apart phenomenon can be observed in the geological trough surrounding California's Salton Sea, and in Death Valley and the Dead Sea. In those cases, the pulled apart regions can include upwelled materials, but may

  17. ESR dating of the fault rocks

    International Nuclear Information System (INIS)

    Lee, Hee Kwon

    2005-01-01

    We carried out ESR dating of fault rocks collected near the nuclear reactor. The Upcheon fault zone is exposed close to the Ulzin nuclear reactor. The space-time pattern of fault activity on the Upcheon fault deduced from ESR dating of fault gouge can be summarised as follows : this fault zone was reactivated between fault breccia derived from Cretaceous sandstone and tertiary volcanic sedimentary rocks about 2 Ma, 1.5 Ma and 1 Ma ago. After those movements, the Upcheon fault was reactivated between Cretaceous sandstone and fault breccia zone about 800 ka ago. This fault zone was reactivated again between fault breccia derived form Cretaceous sandstone and Tertiary volcanic sedimentary rocks about 650 ka and after 125 ka ago. These data suggest that the long-term(200-500 k.y.) cyclic fault activity of the Upcheon fault zone continued into the Pleistocene. In the Ulzin area, ESR dates from the NW and EW trend faults range from 800 ka to 600 ka NE and EW trend faults were reactivated about between 200 ka and 300 ka ago. On the other hand, ESR date of the NS trend fault is about 400 ka and 50 ka. Results of this research suggest the fault activity near the Ulzin nuclear reactor fault activity continued into the Pleistocene. One ESR date near the Youngkwang nuclear reactor is 200 ka

  18. Hazelwood Interim Storage Site annual environmental report for calendar year 1991, Hazelwood, Missouri

    International Nuclear Information System (INIS)

    1992-09-01

    This document describes the environmental monitoring program at the Hazelwood Interim Storage Site (HISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at HISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and radium-226, thorium-230, and total uranium concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards and DCGs are established to protect public health and the environment

  19. Interim research assessment 2003-2005 - Computer Science

    NARCIS (Netherlands)

    Mouthaan, A.J.; Hartel, Pieter H.

    This report primarily serves as a source of information for the 2007 Interim Research Assessment Committee for Computer Science at the three technical universities in the Netherlands. The report also provides information for others interested in our research activities.

  20. Deformation around basin scale normal faults

    International Nuclear Information System (INIS)

    Spahic, D.

    2010-01-01

    Faults in the earth crust occur within large range of scales from microscale over mesoscopic to large basin scale faults. Frequently deformation associated with faulting is not only limited to the fault plane alone, but rather forms a combination with continuous near field deformation in the wall rock, a phenomenon that is generally called fault drag. The correct interpretation and recognition of fault drag is fundamental for the reconstruction of the fault history and determination of fault kinematics, as well as prediction in areas of limited exposure or beyond comprehensive seismic resolution. Based on fault analyses derived from 3D visualization of natural examples of fault drag, the importance of fault geometry for the deformation of marker horizons around faults is investigated. The complex 3D structural models presented here are based on a combination of geophysical datasets and geological fieldwork. On an outcrop scale example of fault drag in the hanging wall of a normal fault, located at St. Margarethen, Burgenland, Austria, data from Ground Penetrating Radar (GPR) measurements, detailed mapping and terrestrial laser scanning were used to construct a high-resolution structural model of the fault plane, the deformed marker horizons and associated secondary faults. In order to obtain geometrical information about the largely unexposed master fault surface, a standard listric balancing dip domain technique was employed. The results indicate that for this normal fault a listric shape can be excluded, as the constructed fault has a geologically meaningless shape cutting upsection into the sedimentary strata. This kinematic modeling result is additionally supported by the observation of deformed horizons in the footwall of the structure. Alternatively, a planar fault model with reverse drag of markers in the hanging wall and footwall is proposed. Deformation around basin scale normal faults. A second part of this thesis investigates a large scale normal fault

  1. An interim report on the State of Nevada socioeconomic studies

    International Nuclear Information System (INIS)

    1989-06-01

    This Interim Report is a report on work in progress and presents findings from the research to date on the potential consequences of a repository for the citizens of Nevada. The research and findings in the Report have been subjected to rigorous peer review as part of the state's effort to insure independent, objective analysis that meets the highest professional standards. The basic research effort will continue through June 1990 and will enable the state to refine and clarify the findings presented in this Interim Report

  2. How do normal faults grow?

    OpenAIRE

    Blækkan, Ingvild; Bell, Rebecca; Rotevatn, Atle; Jackson, Christopher; Tvedt, Anette

    2018-01-01

    Faults grow via a sympathetic increase in their displacement and length (isolated fault model), or by rapid length establishment and subsequent displacement accrual (constant-length fault model). To test the significance and applicability of these two models, we use time-series displacement (D) and length (L) data extracted for faults from nature and experiments. We document a range of fault behaviours, from sympathetic D-L fault growth (isolated growth) to sub-vertical D-L growth trajectorie...

  3. Sample Results From The Interim Salt Disposition Program Macrobatch 7 Tank 21H Qualification Samples

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B.; Washington, A. L. II

    2013-08-08

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 7 for the Interim Salt Disposition Program (ISDP). An ARP and several ESS tests were also performed. This document reports characterization data on the samples of Tank 21H as well as simulated performance of ARP/MCU. No issues with the projected Salt Batch 7 strategy are identified, other than the presence of visible quantities of dark colored solids. A demonstration of the monosodium titanate (0.2 g/L) removal of strontium and actinides provided acceptable 4 hour average decontamination factors for Pu and Sr of 3.22 and 18.4, respectively. The Four ESS tests also showed acceptable behavior with distribution ratios (D(Cs)) values of 15.96, 57.1, 58.6, and 65.6 for the MCU, cold blend, hot blend, and Next Generation Solvent (NGS), respectively. The predicted value for the MCU solvent was 13.2. Currently, there are no models that would allow a prediction of extraction behavior for the other three solvents. SRNL recommends that a model for predicting extraction behavior for cesium removal for the blended solvent and NGS be developed. While no outstanding issues were noted, the presence of solids in the samples should be investigated in future work. It is possible that the solids may represent a potential reservoir of material (such as potassium) that could have an impact on MCU performance if they were to dissolve back into the feed solution. This salt batch is intended to be the first batch to be processed through MCU entirely using the new NGS-MCU solvent.

  4. Fault diagnosis of power transformer based on fault-tree analysis (FTA)

    Science.gov (United States)

    Wang, Yongliang; Li, Xiaoqiang; Ma, Jianwei; Li, SuoYu

    2017-05-01

    Power transformers is an important equipment in power plants and substations, power distribution transmission link is made an important hub of power systems. Its performance directly affects the quality and health of the power system reliability and stability. This paper summarizes the five parts according to the fault type power transformers, then from the time dimension divided into three stages of power transformer fault, use DGA routine analysis and infrared diagnostics criterion set power transformer running state, finally, according to the needs of power transformer fault diagnosis, by the general to the section by stepwise refinement of dendritic tree constructed power transformer fault

  5. Large earthquakes and creeping faults

    Science.gov (United States)

    Harris, Ruth A.

    2017-01-01

    Faults are ubiquitous throughout the Earth's crust. The majority are silent for decades to centuries, until they suddenly rupture and produce earthquakes. With a focus on shallow continental active-tectonic regions, this paper reviews a subset of faults that have a different behavior. These unusual faults slowly creep for long periods of time and produce many small earthquakes. The presence of fault creep and the related microseismicity helps illuminate faults that might not otherwise be located in fine detail, but there is also the question of how creeping faults contribute to seismic hazard. It appears that well-recorded creeping fault earthquakes of up to magnitude 6.6 that have occurred in shallow continental regions produce similar fault-surface rupture areas and similar peak ground shaking as their locked fault counterparts of the same earthquake magnitude. The behavior of much larger earthquakes on shallow creeping continental faults is less well known, because there is a dearth of comprehensive observations. Computational simulations provide an opportunity to fill the gaps in our understanding, particularly of the dynamic processes that occur during large earthquake rupture and arrest.

  6. A novel KFCM based fault diagnosis method for unknown faults in satellite reaction wheels.

    Science.gov (United States)

    Hu, Di; Sarosh, Ali; Dong, Yun-Feng

    2012-03-01

    Reaction wheels are one of the most critical components of the satellite attitude control system, therefore correct diagnosis of their faults is quintessential for efficient operation of these spacecraft. The known faults in any of the subsystems are often diagnosed by supervised learning algorithms, however, this method fails to work correctly when a new or unknown fault occurs. In such cases an unsupervised learning algorithm becomes essential for obtaining the correct diagnosis. Kernel Fuzzy C-Means (KFCM) is one of the unsupervised algorithms, although it has its own limitations; however in this paper a novel method has been proposed for conditioning of KFCM method (C-KFCM) so that it can be effectively used for fault diagnosis of both known and unknown faults as in satellite reaction wheels. The C-KFCM approach involves determination of exact class centers from the data of known faults, in this way discrete number of fault classes are determined at the start. Similarity parameters are derived and determined for each of the fault data point. Thereafter depending on the similarity threshold each data point is issued with a class label. The high similarity points fall into one of the 'known-fault' classes while the low similarity points are labeled as 'unknown-faults'. Simulation results show that as compared to the supervised algorithm such as neural network, the C-KFCM method can effectively cluster historical fault data (as in reaction wheels) and diagnose the faults to an accuracy of more than 91%. Copyright © 2011 ISA. Published by Elsevier Ltd. All rights reserved.

  7. 75 FR 984 - Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites

    Science.gov (United States)

    2010-01-07

    ...The Environmental Protection Agency (EPA or the Agency) is announcing a 50-day public comment period for draft recommended interim preliminary remediation goals (PRGs) developed in the Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and Resource Conservation and Recovery Act (RCRA) Sites. EPA's Office of Solid Waste and Emergency and Emergency Response (OSWER) has developed the draft recommended interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated using existing, peer- reviewed toxicity values and current EPA equations and default exposure assumptions. This Federal Register notice is intended to provide an opportunity for public comment on the draft recommended interim PRGs. EPA will consider any public comments submitted in accordance with this notice and may revise the draft recommended interim PRGs thereafter.

  8. Advanced information processing system: The Army Fault-Tolerant Architecture detailed design overview

    Science.gov (United States)

    Harper, Richard E.; Babikyan, Carol A.; Butler, Bryan P.; Clasen, Robert J.; Harris, Chris H.; Lala, Jaynarayan H.; Masotto, Thomas K.; Nagle, Gail A.; Prizant, Mark J.; Treadwell, Steven

    1994-01-01

    The Army Avionics Research and Development Activity (AVRADA) is pursuing programs that would enable effective and efficient management of large amounts of situational data that occurs during tactical rotorcraft missions. The Computer Aided Low Altitude Night Helicopter Flight Program has identified automated Terrain Following/Terrain Avoidance, Nap of the Earth (TF/TA, NOE) operation as key enabling technology for advanced tactical rotorcraft to enhance mission survivability and mission effectiveness. The processing of critical information at low altitudes with short reaction times is life-critical and mission-critical necessitating an ultra-reliable/high throughput computing platform for dependable service for flight control, fusion of sensor data, route planning, near-field/far-field navigation, and obstacle avoidance operations. To address these needs the Army Fault Tolerant Architecture (AFTA) is being designed and developed. This computer system is based upon the Fault Tolerant Parallel Processor (FTPP) developed by Charles Stark Draper Labs (CSDL). AFTA is hard real-time, Byzantine, fault-tolerant parallel processor which is programmed in the ADA language. This document describes the results of the Detailed Design (Phase 2 and 3 of a 3-year project) of the AFTA development. This document contains detailed descriptions of the program objectives, the TF/TA NOE application requirements, architecture, hardware design, operating systems design, systems performance measurements and analytical models.

  9. Identifying Conventionally Sub-Seismic Faults in Polygonal Fault Systems

    Science.gov (United States)

    Fry, C.; Dix, J.

    2017-12-01

    Polygonal Fault Systems (PFS) are prevalent in hydrocarbon basins globally and represent potential fluid pathways. However the characterization of these pathways is subject to the limitations of conventional 3D seismic imaging; only capable of resolving features on a decametre scale horizontally and metres scale vertically. While outcrop and core examples can identify smaller features, they are limited by the extent of the exposures. The disparity between these scales can allow for smaller faults to be lost in a resolution gap which could mean potential pathways are left unseen. Here the focus is upon PFS from within the London Clay, a common bedrock that is tunnelled into and bears construction foundations for much of London. It is a continuation of the Ieper Clay where PFS were first identified and is found to approach the seafloor within the Outer Thames Estuary. This allows for the direct analysis of PFS surface expressions, via the use of high resolution 1m bathymetric imaging in combination with high resolution seismic imaging. Through use of these datasets surface expressions of over 1500 faults within the London Clay have been identified, with the smallest fault measuring 12m and the largest at 612m in length. The displacements over these faults established from both bathymetric and seismic imaging ranges from 30cm to a couple of metres, scales that would typically be sub-seismic for conventional basin seismic imaging. The orientations and dimensions of the faults within this network have been directly compared to 3D seismic data of the Ieper Clay from the offshore Dutch sector where it exists approximately 1km below the seafloor. These have typical PFS attributes with lengths of hundreds of metres to kilometres and throws of tens of metres, a magnitude larger than those identified in the Outer Thames Estuary. The similar orientations and polygonal patterns within both locations indicates that the smaller faults exist within typical PFS structure but are

  10. Influence of fault steps on rupture termination of strike-slip earthquake faults

    Science.gov (United States)

    Li, Zhengfang; Zhou, Bengang

    2018-03-01

    A statistical analysis was completed on the rupture data of 29 historical strike-slip earthquakes across the world. The purpose of this study is to examine the effects of fault steps on the rupture termination of these events. The results show good correlations between the type and length of steps with the seismic rupture and a poor correlation between the step number and seismic rupture. For different magnitude intervals, the smallest widths of the fault steps (Lt) that can terminate the rupture propagation are variable: Lt = 3 km for Ms 6.5 6.9, Lt = 4 km for Ms 7.0 7.5, Lt = 6 km for Ms 7.5 8.0, and Lt = 8 km for Ms 8.0 8.5. The dilational fault step is easier to rupture through than the compression fault step. The smallest widths of the fault step for the rupture arrest can be used as an indicator to judge the scale of the rupture termination of seismic faults. This is helpful for research on fault segmentation, as well as estimating the magnitude of potential earthquakes, and is thus of significance for the assessment of seismic risks.

  11. A Fault Oblivious Extreme-Scale Execution Environment

    Energy Technology Data Exchange (ETDEWEB)

    McKie, Jim

    2014-11-20

    The FOX project, funded under the ASCR X-stack I program, developed systems software and runtime libraries for a new approach to the data and work distribution for massively parallel, fault oblivious application execution. Our work was motivated by the premise that exascale computing systems will provide a thousand-fold increase in parallelism and a proportional increase in failure rate relative to today’s machines. To deliver the capability of exascale hardware, the systems software must provide the infrastructure to support existing applications while simultaneously enabling efficient execution of new programming models that naturally express dynamic, adaptive, irregular computation; coupled simulations; and massive data analysis in a highly unreliable hardware environment with billions of threads of execution. Our OS research has prototyped new methods to provide efficient resource sharing, synchronization, and protection in a many-core compute node. We have experimented with alternative task/dataflow programming models and shown scalability in some cases to hundreds of thousands of cores. Much of our software is in active development through open source projects. Concepts from FOX are being pursued in next generation exascale operating systems. Our OS work focused on adaptive, application tailored OS services optimized for multi → many core processors. We developed a new operating system NIX that supports role-based allocation of cores to processes which was released to open source. We contributed to the IBM FusedOS project, which promoted the concept of latency-optimized and throughput-optimized cores. We built a task queue library based on distributed, fault tolerant key-value store and identified scaling issues. A second fault tolerant task parallel library was developed, based on the Linda tuple space model, that used low level interconnect primitives for optimized communication. We designed fault tolerance mechanisms for task parallel computations

  12. Plutonium Finishing Plant. Interim plutonium stabilization engineering study

    Energy Technology Data Exchange (ETDEWEB)

    Sevigny, G.J.; Gallucci, R.H.; Garrett, S.M.K.; Geeting, J.G.H.; Goheen, R.S.; Molton, P.M.; Templeton, K.J.; Villegas, A.J. [Pacific Northwest Lab., Richland, WA (United States); Nass, R. [Nuclear Fuel Services, Inc. (United States)

    1995-08-01

    This report provides the results of an engineering study that evaluated the available technologies for stabilizing the plutonium stored at the Plutonium Finishing Plant located at the hanford Site in southeastern Washington. Further processing of the plutonium may be required to prepare the plutonium for interim (<50 years) storage. Specifically this document provides the current plutonium inventory and characterization, the initial screening process, and the process descriptions and flowsheets of the technologies that passed the initial screening. The conclusions and recommendations also are provided. The information contained in this report will be used to assist in the preparation of the environmental impact statement and to help decision makers determine which is the preferred technology to process the plutonium for interim storage.

  13. Plutonium Finishing Plant. Interim plutonium stabilization engineering study

    International Nuclear Information System (INIS)

    Sevigny, G.J.; Gallucci, R.H.; Garrett, S.M.K.; Geeting, J.G.H.; Goheen, R.S.; Molton, P.M.; Templeton, K.J.; Villegas, A.J.; Nass, R.

    1995-08-01

    This report provides the results of an engineering study that evaluated the available technologies for stabilizing the plutonium stored at the Plutonium Finishing Plant located at the hanford Site in southeastern Washington. Further processing of the plutonium may be required to prepare the plutonium for interim (<50 years) storage. Specifically this document provides the current plutonium inventory and characterization, the initial screening process, and the process descriptions and flowsheets of the technologies that passed the initial screening. The conclusions and recommendations also are provided. The information contained in this report will be used to assist in the preparation of the environmental impact statement and to help decision makers determine which is the preferred technology to process the plutonium for interim storage

  14. Hardware architecture and associated programming flow for the design of digital fault-tolerant systems

    International Nuclear Information System (INIS)

    Peyret, Thomas

    2014-01-01

    Whether in automotive with heat stress or in aerospace and nuclear field subjected to cosmic, neutron and gamma radiation, the environment can lead to the development of faults in electronic systems. These faults, which can be transient or permanent, will lead to erroneous results that are unacceptable in some application contexts. The use of so-called rad-hard components is sometimes compromised due to their high costs and supply problems associated with export rules. This thesis proposes a joint hardware and software approach independent of integration technology for using digital programmable devices in environments that generate faults. Our approach includes the definition of a Coarse Grained Re-configurable Architecture (CGRA) able to execute entire application code but also all the hardware and software mechanisms to make it tolerant to transient and permanent faults. This is achieved by the combination of redundancy and dynamic reconfiguration of the CGRA based on a library of configurations generated by a complete conception flow. This implemented flow relies on a flow to map a code represented as a Control and Data Flow Graph (CDFG) on the CGRA architecture by obtaining directly a large number of different configurations and allows to exploit the full potential of architecture. This work, which has been validated through experiments with applications in the field of signal and image processing, has been the subject of two publications in international conferences and of two patents. (author) [fr

  15. Fault diagnosis of sensor networked structures with multiple faults using a virtual beam based approach

    Science.gov (United States)

    Wang, H.; Jing, X. J.

    2017-07-01

    This paper presents a virtual beam based approach suitable for conducting diagnosis of multiple faults in complex structures with limited prior knowledge of the faults involved. The "virtual beam", a recently-proposed concept for fault detection in complex structures, is applied, which consists of a chain of sensors representing a vibration energy transmission path embedded in the complex structure. Statistical tests and adaptive threshold are particularly adopted for fault detection due to limited prior knowledge of normal operational conditions and fault conditions. To isolate the multiple faults within a specific structure or substructure of a more complex one, a 'biased running' strategy is developed and embedded within the bacterial-based optimization method to construct effective virtual beams and thus to improve the accuracy of localization. The proposed method is easy and efficient to implement for multiple fault localization with limited prior knowledge of normal conditions and faults. With extensive experimental results, it is validated that the proposed method can localize both single fault and multiple faults more effectively than the classical trust index subtract on negative add on positive (TI-SNAP) method.

  16. DATA MINING METHODOLOGY FOR DETERMINING THE OPTIMAL MODEL OF COST PREDICTION IN SHIP INTERIM PRODUCT ASSEMBLY

    Directory of Open Access Journals (Sweden)

    Damir Kolich

    2016-03-01

    Full Text Available In order to accurately predict costs of the thousands of interim products that are assembled in shipyards, it is necessary to use skilled engineers to develop detailed Gantt charts for each interim product separately which takes many hours. It is helpful to develop a prediction tool to estimate the cost of interim products accurately and quickly without the need for skilled engineers. This will drive down shipyard costs and improve competitiveness. Data mining is used extensively for developing prediction models in other industries. Since ships consist of thousands of interim products, it is logical to develop a data mining methodology for a shipyard or any other manufacturing industry where interim products are produced. The methodology involves analysis of existing interim products and data collection. Pre-processing and principal component analysis is done to make the data “user-friendly” for later prediction processing and the development of both accurate and robust models. The support vector machine is demonstrated as the better model when there are a lower number of tuples. However as the number of tuples is increased to over 10000, then the artificial neural network model is recommended.

  17. 77 FR 27593 - Exchange Visitor Program-Summer Work Travel

    Science.gov (United States)

    2012-05-11

    ...--Summer Work Travel AGENCY: Department of State. ACTION: Interim final rule with request for comment... Travel Program allows foreign post-secondary students (mostly between the ages of 18 and 30) to come to... students have participated in the Sumer Work Travel Program. The popularity of this Program--both with...

  18. Study of fault diagnosis software design for complex system based on fault tree

    International Nuclear Information System (INIS)

    Yuan Run; Li Yazhou; Wang Jianye; Hu Liqin; Wang Jiaqun; Wu Yican

    2012-01-01

    Complex systems always have high-level reliability and safety requirements, and same does their diagnosis work. As a great deal of fault tree models have been acquired during the design and operation phases, a fault diagnosis method which combines fault tree analysis with knowledge-based technology has been proposed. The prototype of fault diagnosis software has been realized and applied to mobile LIDAR system. (authors)

  19. 3013/9975 Surveillance Program Interim Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Dunn, K.; Hackney, B.; McClard, J.

    2011-06-22

    The K-Area Materials Storage (KAMS) Documented Safety Analysis (DSA) requires a surveillance program to monitor the safety performance of 3013 containers and 9975 shipping packages stored in KAMS. The SRS surveillance program [Reference 1] outlines activities for field surveillance and laboratory tests that demonstrate the packages meet the functional performance requirements described in the DSA. The SRS program also supports the complexwide Integrated Surveillance Program (ISP) [Reference 2] for 3013 containers. The purpose of this report is to provide a summary of the SRS portion of the surveillance program activities through fiscal year 2010 (FY10) and formally communicate the interpretation of these results by the Surveillance Program Authority (SPA). Surveillance for the initial 3013 container random sampling of the Innocuous bin and the Pressure bin has been completed and there has been no indication of corrosion or significant pressurization. The maximum pressure observed was less than 50 psig, which is well below the design pressure of 699 psig for the 3013 container [Reference 3]. The data collected during surveillance of these bins has been evaluated by the Materials Identification and Surveillance (MIS) Working Group and no additional surveillance is necessary for these bins at least through FY13. A decision will be made whether additional surveillance of these bins is needed during future years of storage and as additional containers are generated. Based on the data collected to date, the SPA concludes that 3013 containers in these bins can continue to be safely stored in KAMS. This year, 13 destructive examinations (DE) were performed on random samples from the Pressure & Corrosion bin. To date, DE has been completed for approximately 30% of the random samples from the Pressure & Corrosion bin. In addition, DE has been performed on 6 engineering judgment (EJ) containers, for a total of 17 to date. This includes one container that exceeded the 3013

  20. 18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Interim acceptance and review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water... Director of the Office of Energy Market Regulation; or (ii) Deny the Administrator's interim rate request...

  1. Illite authigenesis during faulting and fluid flow - a microstructural study of fault rocks

    Science.gov (United States)

    Scheiber, Thomas; Viola, Giulio; van der Lelij, Roelant; Margreth, Annina

    2017-04-01

    Authigenic illite can form synkinematically during slip events along brittle faults. In addition it can also crystallize as a result of fluid flow and associated mineral alteration processes in hydrothermal environments. K-Ar dating of illite-bearing fault rocks has recently become a common tool to constrain the timing of fault activity. However, to fully interpret the derived age spectra in terms of deformation ages, a careful investigation of the fault deformation history and architecture at the outcrop-scale, ideally followed by a detailed mineralogical analysis of the illite-forming processes at the micro-scale, are indispensable. Here we integrate this methodological approach by presenting microstructural observations from the host rock immediately adjacent to dated fault gouges from two sites located in the Rolvsnes granodiorite (Bømlo, western Norway). This granodiorite experienced multiple episodes of brittle faulting and fluid-induced alteration, starting in the Mid Ordovician (Scheiber et al., 2016). Fault gouges are predominantly associated with normal faults accommodating mainly E-W extension. K-Ar dating of illites separated from representative fault gouges constrains deformation and alteration due to fluid ingress from the Permian to the Cretaceous, with a cluster of ages for the finest (middle Jurassic. At site one, high-resolution thin section structural mapping reveals a complex deformation history characterized by several coexisting types of calcite veins and seven different generations of cataclasite, two of which contain a significant amount of authigenic and undoubtedly deformation-related illite. At site two, fluid ingress along and adjoining the fault core induced pervasive alteration of the host granodiorite. Quartz is crosscut by calcite veinlets whereas plagioclase, K-feldspar and biotite are almost completely replaced by the main alteration products kaolin, quartz and illite. Illite-bearing micro-domains were physically separated by

  2. Fuel Supply Shutdown Facility Interim Operational Safety Requirements

    International Nuclear Information System (INIS)

    BENECKE, M.W.

    2000-01-01

    The Interim Operational Safety Requirements for the Fuel Supply Shutdown (FSS) Facility define acceptable conditions, safe boundaries, bases thereof, and management of administrative controls to ensure safe operation of the facility

  3. How fault evolution changes strain partitioning and fault slip rates in Southern California: Results from geodynamic modeling

    Science.gov (United States)

    Ye, Jiyang; Liu, Mian

    2017-08-01

    In Southern California, the Pacific-North America relative plate motion is accommodated by the complex southern San Andreas Fault system that includes many young faults (faults and their impact on strain partitioning and fault slip rates are important for understanding the evolution of this plate boundary zone and assessing earthquake hazard in Southern California. Using a three-dimensional viscoelastoplastic finite element model, we have investigated how this plate boundary fault system has evolved to accommodate the relative plate motion in Southern California. Our results show that when the plate boundary faults are not optimally configured to accommodate the relative plate motion, strain is localized in places where new faults would initiate to improve the mechanical efficiency of the fault system. In particular, the Eastern California Shear Zone, the San Jacinto Fault, the Elsinore Fault, and the offshore dextral faults all developed in places of highly localized strain. These younger faults compensate for the reduced fault slip on the San Andreas Fault proper because of the Big Bend, a major restraining bend. The evolution of the fault system changes the apportionment of fault slip rates over time, which may explain some of the slip rate discrepancy between geological and geodetic measurements in Southern California. For the present fault configuration, our model predicts localized strain in western Transverse Ranges and along the dextral faults across the Mojave Desert, where numerous damaging earthquakes occurred in recent years.

  4. Interim Hanford Waste Management Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The September 1985 Interim Hanford Waste Management Plan (HWMP) is the third revision of this document. In the future, the HWMP will be updated on an annual basis or as major changes in disposal planning at Hanford Site require. The most significant changes in the program since the last release of this document in December 1984 include: (1) Based on studies done in support of the Hanford Defense Waste Environmental Impact Statement (HDW-EIS), the size of the protective barriers covering contaminated soil sites, solid waste burial sites, and single-shell tanks has been increased to provide a barrier that extends 30 m beyond the waste zone. (2) As a result of extensive laboratory development and plant testing, removal of transuranic (TRU) elements from PUREX cladding removal waste (CRW) has been initiated in PUREX. (3) The level of capital support in years beyond those for which specific budget projections have been prepared (i.e., fiscal year 1992 and later) has been increased to maintain Hanford Site capability to support potential future missions, such as the extension of N Reactor/PUREX operations. The costs for disposal of Hanford Site defense wastes are identified in four major areas in the HWMP: waste storage and surveillance, technology development, disposal operations, and capital expenditures

  5. ESR dating of fault rocks

    International Nuclear Information System (INIS)

    Lee, Hee Kwon

    2003-02-01

    Past movement on faults can be dated by measurement of the intensity of ESR signals in quartz. These signals are reset by local lattice deformation and local frictional heating on grain contacts at the time of fault movement. The ESR signals then grow back as a result of bombardment by ionizing radiation from surrounding rocks. The age is obtained from the ratio of the equivalent dose, needed to produce the observed signal, to the dose rate. Fine grains are more completely reset during faulting, and a plot of age vs. grain size shows a plateau for grains below critical size; these grains are presumed to have been completely zeroed by the last fault activity. We carried out ESR dating of fault rocks collected near the Gori nuclear reactor. Most of the ESR signals of fault rocks collected from the basement are saturated. This indicates that the last movement of the faults had occurred before the Quaternary period. However, ESR dates from the Oyong fault zone range from 370 to 310 ka. Results of this research suggest that long-term cyclic fault activity of the Oyong fault zone continued into the Pleistocene

  6. ESR dating of fault rocks

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Hee Kwon [Kangwon National Univ., Chuncheon (Korea, Republic of)

    2003-02-15

    Past movement on faults can be dated by measurement of the intensity of ESR signals in quartz. These signals are reset by local lattice deformation and local frictional heating on grain contacts at the time of fault movement. The ESR signals then grow back as a result of bombardment by ionizing radiation from surrounding rocks. The age is obtained from the ratio of the equivalent dose, needed to produce the observed signal, to the dose rate. Fine grains are more completely reset during faulting, and a plot of age vs. grain size shows a plateau for grains below critical size; these grains are presumed to have been completely zeroed by the last fault activity. We carried out ESR dating of fault rocks collected near the Gori nuclear reactor. Most of the ESR signals of fault rocks collected from the basement are saturated. This indicates that the last movement of the faults had occurred before the Quaternary period. However, ESR dates from the Oyong fault zone range from 370 to 310 ka. Results of this research suggest that long-term cyclic fault activity of the Oyong fault zone continued into the Pleistocene.

  7. 78 FR 28953 - William D. Ford Federal Direct Loan Program

    Science.gov (United States)

    2013-05-16

    .... Ford Federal Direct Loan Program; Interim Final Rule #0;#0;Federal Register / Vol. 78, No. 95... [Docket ID ED-2013-OPE-0066] RIN 1840-AD13 William D. Ford Federal Direct Loan Program AGENCY: Office of... Secretary amends the William D. Ford Federal Direct Loan Program (Direct Loan Program) regulations to...

  8. Subsurface Interim Measures/Interim Remedial Action Plan and Decision Document for the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2)

    International Nuclear Information System (INIS)

    1992-01-01

    The Department of Energy (DOE) is pursuing an Interim Measure/Interim Remedial Action (IM/IRA) at the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2) at the Rocky Flats Plant (RFP). This MIRA is to be conducted to provide information that will aid in the selection and design of final remedial actions at OU2 that will address removal of suspected free-phase volatile organic compound (VOC) contamination. The Plan involves investigating the removal of residual free-phase VOCs by in situ vacuum-enhanced vapor extraction technology at 3 suspected VOC source areas within OU2. VOC-contaminated vapors extracted from the subsurface would be treated by granular activated carbon (GAC) adsorption and discharged. The Plan also includes water table depression, when applicable at the test sites, to investigate the performance of vapor extraction technology in the saturated zone. The Plan provides for treatment of any contaminated ground water recovered during the IM/IRA at existing RFP treatment facilities. The proposed MVIRA Plan is presented in the document entitled ''Proposed Subsurface Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document, 903 Pad, Mound, and East Trenches Areas, Operable Unit No. 2, '' dated 20 March 1992. Information concerning the proposed Subsurface IM/IRA was presented during a DOE Quarterly Review meeting held on 07 April 1992 and a public meeting held on 07 May 1992, at the Marriott Hotel in Golden, Colorado. The Responsiveness Summary presents DOE's response to all comments received at the public meeting, as well as those mailed to date to DOE during the public comment period

  9. Fault-tolerant architecture: Evaluation methodology

    International Nuclear Information System (INIS)

    Battle, R.E.; Kisner, R.A.

    1992-08-01

    The design and reliability of four fault-tolerant architectures that may be used in nuclear power plant control systems were evaluated. Two architectures are variations of triple-modular-redundant (TMR) systems, and two are variations of dual redundant systems. The evaluation includes a review of methods of implementing fault-tolerant control, the importance of automatic recovery from failures, methods of self-testing diagnostics, block diagrams of typical fault-tolerant controllers, review of fault-tolerant controllers operating in nuclear power plants, and fault tree reliability analyses of fault-tolerant systems

  10. Active Complementary Control for Affine Nonlinear Control Systems With Actuator Faults.

    Science.gov (United States)

    Fan, Quan-Yong; Yang, Guang-Hong

    2017-11-01

    This paper is concerned with the problem of active complementary control design for affine nonlinear control systems with actuator faults. The outage and loss of effectiveness fault cases are considered. In order to achieve the performance enhancement of the faulty control system, the complementary control scheme is designed in two steps. Firstly, a novel fault estimation scheme is developed. Then, by using the fault estimations to reconstruct the faulty system dynamics and introducing a cost function as the optimization objective, a nearly optimal complementary control is obtained online based on the adaptive dynamic programming (ADP) method. Unlike most of the previous ADP methods with the addition of a probing signal, new adaptive weight update laws are derived to guarantee the convergence of neural network weights and the stability of the closed-loop system, which strongly supports the online implementation of the ADP method. Finally, two simulation examples are given to illustrate the performance and effectiveness of the proposed method.

  11. HOT Faults", Fault Organization, and the Occurrence of the Largest Earthquakes

    Science.gov (United States)

    Carlson, J. M.; Hillers, G.; Archuleta, R. J.

    2006-12-01

    We apply the concept of "Highly Optimized Tolerance" (HOT) for the investigation of spatio-temporal seismicity evolution, in particular mechanisms associated with largest earthquakes. HOT provides a framework for investigating both qualitative and quantitative features of complex feedback systems that are far from equilibrium and punctuated by rare, catastrophic events. In HOT, robustness trade-offs lead to complexity and power laws in systems that are coupled to evolving environments. HOT was originally inspired by biology and engineering, where systems are internally very highly structured, through biological evolution or deliberate design, and perform in an optimum manner despite fluctuations in their surroundings. Though faults and fault systems are not designed in ways comparable to biological and engineered structures, feedback processes are responsible in a conceptually comparable way for the development, evolution and maintenance of younger fault structures and primary slip surfaces of mature faults, respectively. Hence, in geophysical applications the "optimization" approach is perhaps more aptly replaced by "organization", reflecting the distinction between HOT and random, disorganized configurations, and highlighting the importance of structured interdependencies that evolve via feedback among and between different spatial and temporal scales. Expressed in the terminology of the HOT concept, mature faults represent a configuration optimally organized for the release of strain energy; whereas immature, more heterogeneous fault networks represent intermittent, suboptimal systems that are regularized towards structural simplicity and the ability to generate large earthquakes more easily. We discuss fault structure and associated seismic response pattern within the HOT concept, and outline fundamental differences between this novel interpretation to more orthodox viewpoints like the criticality concept. The discussion is flanked by numerical simulations of a

  12. Fault Analysis in Solar Photovoltaic Arrays

    Science.gov (United States)

    Zhao, Ye

    Fault analysis in solar photovoltaic (PV) arrays is a fundamental task to increase reliability, efficiency and safety in PV systems. Conventional fault protection methods usually add fuses or circuit breakers in series with PV components. But these protection devices are only able to clear faults and isolate faulty circuits if they carry a large fault current. However, this research shows that faults in PV arrays may not be cleared by fuses under some fault scenarios, due to the current-limiting nature and non-linear output characteristics of PV arrays. First, this thesis introduces new simulation and analytic models that are suitable for fault analysis in PV arrays. Based on the simulation environment, this thesis studies a variety of typical faults in PV arrays, such as ground faults, line-line faults, and mismatch faults. The effect of a maximum power point tracker on fault current is discussed and shown to, at times, prevent the fault current protection devices to trip. A small-scale experimental PV benchmark system has been developed in Northeastern University to further validate the simulation conclusions. Additionally, this thesis examines two types of unique faults found in a PV array that have not been studied in the literature. One is a fault that occurs under low irradiance condition. The other is a fault evolution in a PV array during night-to-day transition. Our simulation and experimental results show that overcurrent protection devices are unable to clear the fault under "low irradiance" and "night-to-day transition". However, the overcurrent protection devices may work properly when the same PV fault occurs in daylight. As a result, a fault under "low irradiance" and "night-to-day transition" might be hidden in the PV array and become a potential hazard for system efficiency and reliability.

  13. Model environmental assessment for a property-cleanup/interim-storage remedial action at a formerly utilized site

    International Nuclear Information System (INIS)

    Merry-Libby, P.

    1982-07-01

    This document has been prepared as a model for the preparation of an Environmental Assessment (EA) for a property-cleanup/interim-storage type of remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP) of the US Department of Energy (DOE). For major federal actions significantly affecting the quality of the human environment, an Environmental Impact Statement (EIS) must be prepared to aid DOE in making its decision. However, when it is not clear that an action is major and the impacts are significant, an EA may be prepared to determine whether to prepare an EIS or a finding of no significant impact (FONSI). If it is likely that an action may be major and the impacts significant, it is usually more cost-effective and timely to directly prepare an EIS. If it is likely that a FONSI can be reached after some environmental assessment, as DOE believes may be the case for most property-cleanup/interim-storage remedial actions, preparation of site-specific EAs is an effective means of compliance with NEPA

  14. Evolution of the Puente Hills Thrust Fault

    Science.gov (United States)

    Bergen, K. J.; Shaw, J. H.; Dolan, J. F.

    2013-12-01

    This study aims to assess the evolution of the blind Puente Hills thrust fault system (PHT) by determining its age of initiation, lateral propagation history, and changes in slip rate over time. The PHT presents one of the largest seismic hazards in the United States, given its location beneath downtown Los Angeles. The PHT is comprised of three fault segments: the Los Angeles (LA), Santa Fe Springs (SFS), and Coyote Hills (CH). The LA and SFS segments are characterized by growth stratigraphy where folds formed by uplift on the fault segments have been continually buried by sediment from the Los Angeles and San Gabriel rivers. The CH segment has developed topography and is characterized by onlapping growth stratigraphy. This depositional setting gives us the unique opportunity to measure uplift on the LA and SFS fault segments, and minimum uplift on the CH fault segment, as the difference in sediment thicknesses across the buried folds. We utilize depth converted oil industry seismic reflection data to image the fold geometries. Identifying time-correlative stratigraphic markers for slip rate determination in the basin has been a problem for researchers in the past, however, as the faunal assemblages observed in wells are time-transgressive by nature. To overcome this, we utilize the sequence stratigraphic model and well picks of Ponti et al. (2007) as a basis for mapping time-correlative sequence boundaries throughout our industry seismic reflection data from the present to the Pleistocene. From the Pleistocene to Miocene we identify additional sequence boundaries in our seismic reflection data from imaged sequence geometries and by correlating industry well formation tops. The sequence and formation top picks are then used to build 3-dimensional surfaces in the modeling program Gocad. From these surfaces we measure the change in thicknesses across the folds to obtain uplift rates between each sequence boundary. Our results show three distinct phases of

  15. Aftershocks illuminate the 2011 Mineral, Virginia, earthquake causative fault zone and nearby active faults

    Science.gov (United States)

    Horton, J. Wright; Shah, Anjana K.; McNamara, Daniel E.; Snyder, Stephen L.; Carter, Aina M

    2015-01-01

    Deployment of temporary seismic stations after the 2011 Mineral, Virginia (USA), earthquake produced a well-recorded aftershock sequence. The majority of aftershocks are in a tabular cluster that delineates the previously unknown Quail fault zone. Quail fault zone aftershocks range from ~3 to 8 km in depth and are in a 1-km-thick zone striking ~036° and dipping ~50°SE, consistent with a 028°, 50°SE main-shock nodal plane having mostly reverse slip. This cluster extends ~10 km along strike. The Quail fault zone projects to the surface in gneiss of the Ordovician Chopawamsic Formation just southeast of the Ordovician–Silurian Ellisville Granodiorite pluton tail. The following three clusters of shallow (<3 km) aftershocks illuminate other faults. (1) An elongate cluster of early aftershocks, ~10 km east of the Quail fault zone, extends 8 km from Fredericks Hall, strikes ~035°–039°, and appears to be roughly vertical. The Fredericks Hall fault may be a strand or splay of the older Lakeside fault zone, which to the south spans a width of several kilometers. (2) A cluster of later aftershocks ~3 km northeast of Cuckoo delineates a fault near the eastern contact of the Ordovician Quantico Formation. (3) An elongate cluster of late aftershocks ~1 km northwest of the Quail fault zone aftershock cluster delineates the northwest fault (described herein), which is temporally distinct, dips more steeply, and has a more northeastward strike. Some aftershock-illuminated faults coincide with preexisting units or structures evident from radiometric anomalies, suggesting tectonic inheritance or reactivation.

  16. On-site interim storage of spent nuclear fuel: Emerging public issues

    International Nuclear Information System (INIS)

    Feldman, D.L.; Tennessee Univ., Knoxville, TN

    1992-01-01

    Failure to consummate plans for a permanent repository or above- ground interim Monitored Retrievable Storage (MRS) facility for spent nuclear fuel has spurred innovative efforts to ensure at-reactor storage in an environmentally safe and secure manner. This article examines the institutional and socioeconomic impacts of Dry Cask Storage Technology (DCST)-an approach to spent fuel management that is emerging as the preferred method of on-site interim spent fuel storage by utilities that exhaust existing storage capacity

  17. SAFTAC, Monte-Carlo Fault Tree Simulation for System Design Performance and Optimization

    International Nuclear Information System (INIS)

    Crosetti, P.A.; Garcia de Viedma, L.

    1976-01-01

    1 - Description of problem or function: SAFTAC is a Monte Carlo fault tree simulation program that provides a systematic approach for analyzing system design, performing trade-off studies, and optimizing system changes or additions. 2 - Method of solution: SAFTAC assumes an exponential failure distribution for basic input events and a choice of either Gaussian distributed or constant repair times. The program views the system represented by the fault tree as a statistical assembly of independent basic input events, each characterized by an exponential failure distribution and, if used, a constant or normal repair distribution. 3 - Restrictions on the complexity of the problem: The program is dimensioned to handle 1100 basic input events and 1100 logical gates. It can be re-dimensioned to handle up to 2000 basic input events and 2000 logical gates within the existing core memory

  18. Paleoseismicity of two historically quiescent faults in Australia: Implications for fault behavior in stable continental regions

    Science.gov (United States)

    Crone, A.J.; De Martini, P. M.; Machette, M.M.; Okumura, K.; Prescott, J.R.

    2003-01-01

    Paleoseismic studies of two historically aseismic Quaternary faults in Australia confirm that cratonic faults in stable continental regions (SCR) typically have a long-term behavior characterized by episodes of activity separated by quiescent intervals of at least 10,000 and commonly 100,000 years or more. Studies of the approximately 30-km-long Roopena fault in South Australia and the approximately 30-km-long Hyden fault in Western Australia document multiple Quaternary surface-faulting events that are unevenly spaced in time. The episodic clustering of events on cratonic SCR faults may be related to temporal fluctuations of fault-zone fluid pore pressures in a volume of strained crust. The long-term slip rate on cratonic SCR faults is extremely low, so the geomorphic expression of many cratonic SCR faults is subtle, and scarps may be difficult to detect because they are poorly preserved. Both the Roopena and Hyden faults are in areas of limited or no significant seismicity; these and other faults that we have studied indicate that many potentially hazardous SCR faults cannot be recognized solely on the basis of instrumental data or historical earthquakes. Although cratonic SCR faults may appear to be nonhazardous because they have been historically aseismic, those that are favorably oriented for movement in the current stress field can and have produced unexpected damaging earthquakes. Paleoseismic studies of modern and prehistoric SCR faulting events provide the basis for understanding of the long-term behavior of these faults and ultimately contribute to better seismic-hazard assessments.

  19. Environmental assessment for 881 Hillside (High Priority Sites) interim remedial action

    International Nuclear Information System (INIS)

    1990-01-01

    This Environmental Assessment evaluates the impact of an interim remedial action proposed for the High Priority Sites (881 Hillside Area) at the Rocky Flats Plant (RFP). This interim action is to be conducted to minimize the release of hazardous substances from the 881 Hillside Area that pose a potential long-term threat to public health and the environment. This document integrates current site characterization data and environmental analyses required by the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or ''Superfund'' process, into an environmental assessment pursuant to the National Environmental Policy Act (NEPA). Characterization of the 881 Hillside Area is continuing. Consequently, a final remedial action has not yet been proposed. Environmental impacts associated with the proposed interim remedial action and reasonable alternatives designed to remove organic and inorganic contaminants, including radionuclides, from alluvial groundwater in the 881 Hillside Area are addressed. 24 refs., 5 figs., 23 tabs

  20. Transitioning aluminum clad spent fuels from wet to interim dry storage

    International Nuclear Information System (INIS)

    Louthan, M.R. Jr.; Iyer, N.C.; Sindelar, R.L.; Peacock, H.B. Jr.

    1994-01-01

    The United States Department of Energy (DOE) currently owns several hundred metric tons of aluminum clad, spent nuclear fuel and target assemblies. The vast majority of these irradiated assemblies are currently stored in water basins that were designed and operated for short term fuel cooling prior to fuel reprocessing. Recent DOE decisions to severely limit the reprocessing option have significantly lengthened the time of storage, thus increasing the tendency for corrosion induced degradation of the fuel cladding and the underlying core material. The portent of continued corrosion, coupled with the age of existing wet storage facilities and the cost of continuing basin operations, including necessary upgrades to meet current facility standards, may force the DOE to transition these wet stored, aluminum clad spent fuels to interim dry storage. The facilities for interim dry storage have not been developed, partially because fuel storage requirements and specifications for acceptable fuel forms are lacking. In spite of the lack of both facilities and specifications, current plans are to dry store fuels for approximately 40 to 60 years or until firm decisions are developed for final fuel disposition. The transition of the aluminum clad fuels from wet to interim dry storage will require a sequence of drying and canning operations which will include selected fuel preparations such as vacuum drying and conditioning of the storage atmosphere. Laboratory experiments and review of the available literature have demonstrated that successful interim dry storage may also require the use of fuel and canister cleaning or rinsing techniques that preclude, or at least minimize, the potential for the accumulation of chloride and other potentially deleterious ions in the dry storage environment. This paper summarizes an evaluation of the impact of fuel transitioning techniques on the potential for corrosion induced degradation of fuel forms during interim dry storage

  1. Misbheaving Faults: The Expanding Role of Geodetic Imaging in Unraveling Unexpected Fault Slip Behavior

    Science.gov (United States)

    Barnhart, W. D.; Briggs, R.

    2015-12-01

    Geodetic imaging techniques enable researchers to "see" details of fault rupture that cannot be captured by complementary tools such as seismology and field studies, thus providing increasingly detailed information about surface strain, slip kinematics, and how an earthquake may be transcribed into the geological record. For example, the recent Haiti, Sierra El Mayor, and Nepal earthquakes illustrate the fundamental role of geodetic observations in recording blind ruptures where purely geological and seismological studies provided incomplete views of rupture kinematics. Traditional earthquake hazard analyses typically rely on sparse paleoseismic observations and incomplete mapping, simple assumptions of slip kinematics from Andersonian faulting, and earthquake analogs to characterize the probabilities of forthcoming ruptures and the severity of ground accelerations. Spatially dense geodetic observations in turn help to identify where these prevailing assumptions regarding fault behavior break down and highlight new and unexpected kinematic slip behavior. Here, we focus on three key contributions of space geodetic observations to the analysis of co-seismic deformation: identifying near-surface co-seismic slip where no easily recognized fault rupture exists; discerning non-Andersonian faulting styles; and quantifying distributed, off-fault deformation. The 2013 Balochistan strike slip earthquake in Pakistan illuminates how space geodesy precisely images non-Andersonian behavior and off-fault deformation. Through analysis of high-resolution optical imagery and DEMs, evidence emerges that a single fault map slip as both a strike slip and dip slip fault across multiple seismic cycles. These observations likewise enable us to quantify on-fault deformation, which account for ~72% of the displacements in this earthquake. Nonetheless, the spatial distribution of on- and off-fault deformation in this event is highly spatially variable- a complicating factor for comparisons

  2. 3013/9975 Surveillance Program Interim Summary Report

    International Nuclear Information System (INIS)

    Dunn, K.; Hackney, B.; McClard, J.

    2011-01-01

    The K-Area Materials Storage (KAMS) Documented Safety Analysis (DSA) requires a surveillance program to monitor the safety performance of 3013 containers and 9975 shipping packages stored in KAMS. The SRS surveillance program (Reference 1) outlines activities for field surveillance and laboratory tests that demonstrate the packages meet the functional performance requirements described in the DSA. The SRS program also supports the complexwide Integrated Surveillance Program (ISP) (Reference 2) for 3013 containers. The purpose of this report is to provide a summary of the SRS portion of the surveillance program activities through fiscal year 2010 (FY10) and formally communicate the interpretation of these results by the Surveillance Program Authority (SPA). Surveillance for the initial 3013 container random sampling of the Innocuous bin and the Pressure bin has been completed and there has been no indication of corrosion or significant pressurization. The maximum pressure observed was less than 50 psig, which is well below the design pressure of 699 psig for the 3013 container (Reference 3). The data collected during surveillance of these bins has been evaluated by the Materials Identification and Surveillance (MIS) Working Group and no additional surveillance is necessary for these bins at least through FY13. A decision will be made whether additional surveillance of these bins is needed during future years of storage and as additional containers are generated. Based on the data collected to date, the SPA concludes that 3013 containers in these bins can continue to be safely stored in KAMS. This year, 13 destructive examinations (DE) were performed on random samples from the Pressure and Corrosion bin. To date, DE has been completed for approximately 30% of the random samples from the Pressure and Corrosion bin. In addition, DE has been performed on 6 engineering judgment (EJ) containers, for a total of 17 to date. This includes one container that exceeded the 3013

  3. Fault strength in Marmara region inferred from the geometry of the principle stress axes and fault orientations: A case study for the Prince's Islands fault segment

    Science.gov (United States)

    Pinar, Ali; Coskun, Zeynep; Mert, Aydin; Kalafat, Dogan

    2015-04-01

    The general consensus based on historical earthquake data point out that the last major moment release on the Prince's islands fault was in 1766 which in turn signals an increased seismic risk for Istanbul Metropolitan area considering the fact that most of the 20 mm/yr GPS derived slip rate for the region is accommodated mostly by that fault segment. The orientation of the Prince's islands fault segment overlaps with the NW-SE direction of the maximum principle stress axis derived from the focal mechanism solutions of the large and moderate sized earthquakes occurred in the Marmara region. As such, the NW-SE trending fault segment translates the motion between the two E-W trending branches of the North Anatolian fault zone; one extending from the Gulf of Izmit towards Çınarcık basin and the other extending between offshore Bakırköy and Silivri. The basic relation between the orientation of the maximum and minimum principal stress axes, the shear and normal stresses, and the orientation of a fault provides clue on the strength of a fault, i.e., its frictional coefficient. Here, the angle between the fault normal and maximum compressive stress axis is a key parameter where fault normal and fault parallel maximum compressive stress might be a necessary and sufficient condition for a creeping event. That relation also implies that when the trend of the sigma-1 axis is close to the strike of the fault the shear stress acting on the fault plane approaches zero. On the other hand, the ratio between the shear and normal stresses acting on a fault plane is proportional to the coefficient of frictional coefficient of the fault. Accordingly, the geometry between the Prince's islands fault segment and a maximum principal stress axis matches a weak fault model. In the frame of the presentation we analyze seismological data acquired in Marmara region and interpret the results in conjuction with the above mentioned weak fault model.

  4. Distribution network fault section identification and fault location using artificial neural network

    DEFF Research Database (Denmark)

    Dashtdar, Masoud; Dashti, Rahman; Shaker, Hamid Reza

    2018-01-01

    In this paper, a method for fault location in power distribution network is presented. The proposed method uses artificial neural network. In order to train the neural network, a series of specific characteristic are extracted from the recorded fault signals in relay. These characteristics...... components of the sequences as well as three-phase signals could be obtained using statistics to extract the hidden features inside them and present them separately to train the neural network. Also, since the obtained inputs for the training of the neural network strongly depend on the fault angle, fault...... resistance, and fault location, the training data should be selected such that these differences are properly presented so that the neural network does not face any issues for identification. Therefore, selecting the signal processing function, data spectrum and subsequently, statistical parameters...

  5. Loading of the San Andreas fault by flood-induced rupture of faults beneath the Salton Sea

    Science.gov (United States)

    Brothers, Daniel; Kilb, Debi; Luttrell, Karen; Driscoll, Neal W.; Kent, Graham

    2011-01-01

    The southern San Andreas fault has not experienced a large earthquake for approximately 300 years, yet the previous five earthquakes occurred at ~180-year intervals. Large strike-slip faults are often segmented by lateral stepover zones. Movement on smaller faults within a stepover zone could perturb the main fault segments and potentially trigger a large earthquake. The southern San Andreas fault terminates in an extensional stepover zone beneath the Salton Sea—a lake that has experienced periodic flooding and desiccation since the late Holocene. Here we reconstruct the magnitude and timing of fault activity beneath the Salton Sea over several earthquake cycles. We observe coincident timing between flooding events, stepover fault displacement and ruptures on the San Andreas fault. Using Coulomb stress models, we show that the combined effect of lake loading, stepover fault movement and increased pore pressure could increase stress on the southern San Andreas fault to levels sufficient to induce failure. We conclude that rupture of the stepover faults, caused by periodic flooding of the palaeo-Salton Sea and by tectonic forcing, had the potential to trigger earthquake rupture on the southern San Andreas fault. Extensional stepover zones are highly susceptible to rapid stress loading and thus the Salton Sea may be a nucleation point for large ruptures on the southern San Andreas fault.

  6. Fault Detection for Industrial Processes

    Directory of Open Access Journals (Sweden)

    Yingwei Zhang

    2012-01-01

    Full Text Available A new fault-relevant KPCA algorithm is proposed. Then the fault detection approach is proposed based on the fault-relevant KPCA algorithm. The proposed method further decomposes both the KPCA principal space and residual space into two subspaces. Compared with traditional statistical techniques, the fault subspace is separated based on the fault-relevant influence. This method can find fault-relevant principal directions and principal components of systematic subspace and residual subspace for process monitoring. The proposed monitoring approach is applied to Tennessee Eastman process and penicillin fermentation process. The simulation results show the effectiveness of the proposed method.

  7. Numerical modelling of the mechanical and fluid flow properties of fault zones - Implications for fault seal analysis

    NARCIS (Netherlands)

    Heege, J.H. ter; Wassing, B.B.T.; Giger, S.B.; Clennell, M.B.

    2009-01-01

    Existing fault seal algorithms are based on fault zone composition and fault slip (e.g., shale gouge ratio), or on fault orientations within the contemporary stress field (e.g., slip tendency). In this study, we aim to develop improved fault seal algorithms that account for differences in fault zone

  8. The mechanics of fault-bend folding and tear-fault systems in the Niger Delta

    Science.gov (United States)

    Benesh, Nathan Philip

    This dissertation investigates the mechanics of fault-bend folding using the discrete element method (DEM) and explores the nature of tear-fault systems in the deep-water Niger Delta fold-and-thrust belt. In Chapter 1, we employ the DEM to investigate the development of growth structures in anticlinal fault-bend folds. This work was inspired by observations that growth strata in active folds show a pronounced upward decrease in bed dip, in contrast to traditional kinematic fault-bend fold models. Our analysis shows that the modeled folds grow largely by parallel folding as specified by the kinematic theory; however, the process of folding over a broad axial surface zone yields a component of fold growth by limb rotation that is consistent with the patterns observed in natural folds. This result has important implications for how growth structures can he used to constrain slip and paleo-earthquake ages on active blind-thrust faults. In Chapter 2, we expand our DEM study to investigate the development of a wider range of fault-bend folds. We examine the influence of mechanical stratigraphy and quantitatively compare our models with the relationships between fold and fault shape prescribed by the kinematic theory. While the synclinal fault-bend models closely match the kinematic theory, the modeled anticlinal fault-bend folds show robust behavior that is distinct from the kinematic theory. Specifically, we observe that modeled structures maintain a linear relationship between fold shape (gamma) and fault-horizon cutoff angle (theta), rather than expressing the non-linear relationship with two distinct modes of anticlinal folding that is prescribed by the kinematic theory. These observations lead to a revised quantitative relationship for fault-bend folds that can serve as a useful interpretation tool. Finally, in Chapter 3, we examine the 3D relationships of tear- and thrust-fault systems in the western, deep-water Niger Delta. Using 3D seismic reflection data and new

  9. Active faults, paleoseismology, and historical fault rupture in northern Wairarapa, North Island, New Zealand

    International Nuclear Information System (INIS)

    Schermer, E.R.; Van Dissen, R.; Berryman, K.R.; Kelsey, H.M.; Cashman, S.M.

    2004-01-01

    Active faulting in the upper plate of the Hikurangi subduction zone, North Island, New Zealand, represents a significant seismic hazard that is not yet well understood. In northern Wairarapa, the geometry and kinematics of active faults, and the Quaternary and historical surface-rupture record, have not previously been studied in detail. We present the results of mapping and paleoseismicity studies on faults in the northern Wairarapa region to document the characteristics of active faults and the timing of earthquakes. We focus on evidence for surface rupture in the 1855 Wairarapa (M w 8.2) and 1934 Pahiatua (M w 7.4) earthquakes, two of New Zealand's largest historical earthquakes. The Dreyers Rock, Alfredton, Saunders Road, Waitawhiti, and Waipukaka faults form a northeast-trending, east-stepping array of faults. Detailed mapping of offset geomorphic features shows the rupture lengths vary from c. 7 to 20 km and single-event displacements range from 3 to 7 m, suggesting the faults are capable of generating M >7 earthquakes. Trenching results show that two earthquakes have occurred on the Alfredton Fault since c. 2900 cal. BP. The most recent event probably occurred during the 1855 Wairarapa earthquake as slip propagated northward from the Wairarapa Fault and across a 6 km wide step. Waipukaka Fault trenches show that at least three surface-rupturing earthquakes have occurred since 8290-7880 cal. BP. Analysis of stratigraphic and historical evidence suggests the most recent rupture occurred during the 1934 Pahiatua earthquake. Estimates of slip rates provided by these data suggest that a larger component of strike slip than previously suspected is occurring within the upper plate and that the faults accommodate a significant proportion of the dextral component of oblique subduction. Assessment of seismic hazard is difficult because the known fault scarp lengths appear too short to have accommodated the estimated single-event displacements. Faults in the region are

  10. Computer Simulation of Complex Power System Faults under various Operating Conditions

    International Nuclear Information System (INIS)

    Khandelwal, Tanuj; Bowman, Mark

    2015-01-01

    A power system is normally treated as a balanced symmetrical three-phase network. When a fault occurs, the symmetry is normally upset, resulting in unbalanced currents and voltages appearing in the network. For the correct application of protection equipment, it is essential to know the fault current distribution throughout the system and the voltages in different parts of the system due to the fault. There may be situations where protection engineers have to analyze faults that are more complex than simple shunt faults. One type of complex fault is an open phase condition that can result from a fallen conductor or failure of a breaker pole. In the former case, the condition is often accompanied by a fault detectable with normal relaying. In the latter case, the condition may be undetected by standard line relaying. The effect on a generator is dependent on the location of the open phase and the load level. If an open phase occurs between the generator terminals and the high-voltage side of the GSU in the switchyard, and the generator is at full load, damaging negative sequence current can be generated. However, for the same operating condition, an open conductor at the incoming transmission lines located in the switchyard can result in minimal negative sequence current. In 2012, a nuclear power generating station (NPGS) suffered series or open phase fault due to insulator mechanical failure in the 345 kV switchyard. This resulted in both reactor units tripping offline in two separate incidents. Series fault on one of the phases resulted in voltage imbalance that was not detected by the degraded voltage relays. These under-voltage relays did not initiate a start signal to the emergency diesel generators (EDG) because they sensed adequate voltage on the remaining phases exposing a design vulnerability. This paper is intended to help protection engineers calculate complex circuit faults like open phase condition using computer program. The impact of this type of

  11. FTMP (Fault Tolerant Multiprocessor) programmer's manual

    Science.gov (United States)

    Feather, F. E.; Liceaga, C. A.; Padilla, P. A.

    1986-01-01

    The Fault Tolerant Multiprocessor (FTMP) computer system was constructed using the Rockwell/Collins CAPS-6 processor. It is installed in the Avionics Integration Research Laboratory (AIRLAB) of NASA Langley Research Center. It is hosted by AIRLAB's System 10, a VAX 11/750, for the loading of programs and experimentation. The FTMP support software includes a cross compiler for a high level language called Automated Engineering Design (AED) System, an assembler for the CAPS-6 processor assembly language, and a linker. Access to this support software is through an automated remote access facility on the VAX which relieves the user of the burden of learning how to use the IBM 4381. This manual is a compilation of information about the FTMP support environment. It explains the FTMP software and support environment along many of the finer points of running programs on FTMP. This will be helpful to the researcher trying to run an experiment on FTMP and even to the person probing FTMP with fault injections. Much of the information in this manual can be found in other sources; we are only attempting to bring together the basic points in a single source. If the reader should need points clarified, there is a list of support documentation in the back of this manual.

  12. Fault prediction for nonlinear stochastic system with incipient faults based on particle filter and nonlinear regression.

    Science.gov (United States)

    Ding, Bo; Fang, Huajing

    2017-05-01

    This paper is concerned with the fault prediction for the nonlinear stochastic system with incipient faults. Based on the particle filter and the reasonable assumption about the incipient faults, the modified fault estimation algorithm is proposed, and the system state is estimated simultaneously. According to the modified fault estimation, an intuitive fault detection strategy is introduced. Once each of the incipient fault is detected, the parameters of which are identified by a nonlinear regression method. Then, based on the estimated parameters, the future fault signal can be predicted. Finally, the effectiveness of the proposed method is verified by the simulations of the Three-tank system. Copyright © 2017 ISA. Published by Elsevier Ltd. All rights reserved.

  13. SAFOD Penetrates the San Andreas Fault

    Directory of Open Access Journals (Sweden)

    Mark D. Zoback

    2006-03-01

    Full Text Available SAFOD, the San Andreas Fault Observatory at Depth (Fig. 1, completed an important milestone in July 2005 by drilling through the San Andreas Fault at seismogenic depth. SAFOD is one of three major components of EarthScope, a U.S. National Science Foundation (NSF initiative being conducted in collaboration with the U.S. Geological Survey (USGS. The International Continental Scientific DrillingProgram (ICDP provides engineering and technical support for the project as well as online access to project data and information (http://www.icdp-online.de/sites/sanandreas/news/news1.html. In 2002, the ICDP, the NSF, and the USGS provided funding for a pilot hole project at the SAFOD site. Twenty scientifi c papers summarizing the results of the pilot hole project as well as pre-SAFOD site characterization studies were published in Geophysical Research Letters (Vol.31, Nos. 12 and 15, 2004.

  14. High-Intensity Radiated Field Fault-Injection Experiment for a Fault-Tolerant Distributed Communication System

    Science.gov (United States)

    Yates, Amy M.; Torres-Pomales, Wilfredo; Malekpour, Mahyar R.; Gonzalez, Oscar R.; Gray, W. Steven

    2010-01-01

    Safety-critical distributed flight control systems require robustness in the presence of faults. In general, these systems consist of a number of input/output (I/O) and computation nodes interacting through a fault-tolerant data communication system. The communication system transfers sensor data and control commands and can handle most faults under typical operating conditions. However, the performance of the closed-loop system can be adversely affected as a result of operating in harsh environments. In particular, High-Intensity Radiated Field (HIRF) environments have the potential to cause random fault manifestations in individual avionic components and to generate simultaneous system-wide communication faults that overwhelm existing fault management mechanisms. This paper presents the design of an experiment conducted at the NASA Langley Research Center's HIRF Laboratory to statistically characterize the faults that a HIRF environment can trigger on a single node of a distributed flight control system.

  15. Structural system reliability calculation using a probabilistic fault tree analysis method

    Science.gov (United States)

    Torng, T. Y.; Wu, Y.-T.; Millwater, H. R.

    1992-01-01

    The development of a new probabilistic fault tree analysis (PFTA) method for calculating structural system reliability is summarized. The proposed PFTA procedure includes: developing a fault tree to represent the complex structural system, constructing an approximation function for each bottom event, determining a dominant sampling sequence for all bottom events, and calculating the system reliability using an adaptive importance sampling method. PFTA is suitable for complicated structural problems that require computer-intensive computer calculations. A computer program has been developed to implement the PFTA.

  16. Colonie Interim Storage Site environmental surveillance report for calendar year 1993

    International Nuclear Information System (INIS)

    1994-06-01

    This report summarizes the results of environmental surveillance activities conducted at the Colonie Interim Storage Site (CISS) during calendar year 1993. It includes an overview of site operations, the basis for radiological and nonradiological monitoring, dose to the offsite population, and summaries of environmental programs at CISS. Environmental surveillance activities were conducted in accordance with the site environmental monitoring plan, which describes the rationale and design criteria for the surveillance program, the frequency of sampling and analysis, specific sampling and analysis procedures, and quality assurance requirements. Appendix A contains a discussion of the nature of radiation, the way it is measured, and common sources of it. The primary environmental guidelines and limits applicable to CISS are given in US Department of Energy (DOE) orders and mandated by six federal acts: the Clean Air Act; the Clean Water Act; the Resource Conservation and Recovery Act (RCRA); the Toxic Substances Control Act; the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); and the National Environmental Policy Act (NEPA). DOE began environmental monitoring of CISS in 1984 when DOE was authorized by Congress through the Energy and Water Development Appropriations Act to conduct a decontamination research and development program at the site. The site was subsequently assigned to DOE's Formerly Utilized Sites Remedial Action Program (FUSRAP)

  17. The EMEFS model evaluation. An interim report

    Energy Technology Data Exchange (ETDEWEB)

    Barchet, W.R. [Pacific Northwest Lab., Richland, WA (United States); Dennis, R.L. [Environmental Protection Agency, Research Triangle Park, NC (United States); Seilkop, S.K. [Analytical Sciences, Inc., Durham, NC (United States); Banic, C.M.; Davies, D.; Hoff, R.M.; Macdonald, A.M.; Mickle, R.E.; Padro, J.; Puckett, K. [Atmospheric Environment Service, Downsview, ON (Canada); Byun, D.; McHenry, J.N. [Computer Sciences Corp., Research Triangle Park, NC (United States); Karamchandani, P.; Venkatram, A. [ENSR Consulting and Engineering, Camarillo, CA (United States); Fung, C.; Misra, P.K. [Ontario Ministry of the Environment, Toronto, ON (Canada); Hansen, D.A. [Electric Power Research Inst., Palo Alto, CA (United States); Chang, J.S. [State Univ. of New York, Albany, NY (United States). Atmospheric Sciences Research Center

    1991-12-01

    The binational Eulerian Model Evaluation Field Study (EMEFS) consisted of several coordinated data gathering and model evaluation activities. In the EMEFS, data were collected by five air and precipitation monitoring networks between June 1988 and June 1990. Model evaluation is continuing. This interim report summarizes the progress made in the evaluation of the Regional Acid Deposition Model (RADM) and the Acid Deposition and Oxidant Model (ADOM) through the December 1990 completion of a State of Science and Technology report on model evaluation for the National Acid Precipitation Assessment Program (NAPAP). Because various assessment applications of RADM had to be evaluated for NAPAP, the report emphasizes the RADM component of the evaluation. A protocol for the evaluation was developed by the model evaluation team and defined the observed and predicted values to be used and the methods by which the observed and predicted values were to be compared. Scatter plots and time series of predicted and observed values were used to present the comparisons graphically. Difference statistics and correlations were used to quantify model performance. 64 refs., 34 figs., 6 tabs.

  18. Development of Fault Models for Hybrid Fault Detection and Diagnostics Algorithm: October 1, 2014 -- May 5, 2015

    Energy Technology Data Exchange (ETDEWEB)

    Cheung, Howard [Purdue Univ., West Lafayette, IN (United States); Braun, James E. [Purdue Univ., West Lafayette, IN (United States)

    2015-12-31

    This report describes models of building faults created for OpenStudio to support the ongoing development of fault detection and diagnostic (FDD) algorithms at the National Renewable Energy Laboratory. Building faults are operating abnormalities that degrade building performance, such as using more energy than normal operation, failing to maintain building temperatures according to the thermostat set points, etc. Models of building faults in OpenStudio can be used to estimate fault impacts on building performance and to develop and evaluate FDD algorithms. The aim of the project is to develop fault models of typical heating, ventilating and air conditioning (HVAC) equipment in the United States, and the fault models in this report are grouped as control faults, sensor faults, packaged and split air conditioner faults, water-cooled chiller faults, and other uncategorized faults. The control fault models simulate impacts of inappropriate thermostat control schemes such as an incorrect thermostat set point in unoccupied hours and manual changes of thermostat set point due to extreme outside temperature. Sensor fault models focus on the modeling of sensor biases including economizer relative humidity sensor bias, supply air temperature sensor bias, and water circuit temperature sensor bias. Packaged and split air conditioner fault models simulate refrigerant undercharging, condenser fouling, condenser fan motor efficiency degradation, non-condensable entrainment in refrigerant, and liquid line restriction. Other fault models that are uncategorized include duct fouling, excessive infiltration into the building, and blower and pump motor degradation.

  19. Administrative Court Stade, decision of March 22, 1985 (interim storage facility at Gorleben)

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    This decision deals with the planned interim storage facility of Gorleben (F.R.G.). The provisions introduced by the 4th ammendment to sec. 5 para. 6 and 9a to 9c of the German Atomic Energy Act might contain a definite regulation of the 'Entsorgung' of nuclear power stations. Sec. 6 of the Atomic Energy Act is not applicable to interim storage facilities because irradiated nuclear fuel has a double nature: It is spent fuel and nuclear waste as well. Considering current licensing procedures of construction and operation of nuclear installations in the field of 'Entsorgung', special legal regulations for the construction and operation of an interim storage facility have to be required. (CW)

  20. Absolute age determination of quaternary faults

    International Nuclear Information System (INIS)

    Cheong, Chang Sik; Lee, Seok Hoon; Choi, Man Sik

    2000-03-01

    To constrain the age of neotectonic fault movement, Rb-Sr, K-Ar, U-series disequilibrium, C-14 and Be-10 methods were applied to the fault gouges, fracture infillings and sediments from the Malbang, Ipsil, Wonwonsa faults faults in the Ulsan fault zone, Yangsan fault in the Yeongdeog area and southeastern coastal area. Rb-Sr and K-Ar data imply that the fault movement of the Ulan fault zone initiated at around 30 Ma and preliminary dating result for the Yang san fault is around 70 Ma in the Yeongdeog area. K-Ar and U-series disequilibrium dating results for fracture infillings in the Ipsil fault are consistent with reported ESR ages. Radiocarbon ages of quaternary sediments from the Jeongjari area are discordant with stratigraphic sequence. Carbon isotope data indicate a difference of sedimentry environment for those samples. Be-10 dating results for the Suryum fault area are consistent with reported OSL results

  1. Absolute age determination of quaternary faults

    Energy Technology Data Exchange (ETDEWEB)

    Cheong, Chang Sik; Lee, Seok Hoon; Choi, Man Sik [Korea Basic Science Institute, Seoul (Korea, Republic of)] (and others)

    2000-03-15

    To constrain the age of neotectonic fault movement, Rb-Sr, K-Ar, U-series disequilibrium, C-14 and Be-10 methods were applied to the fault gouges, fracture infillings and sediments from the Malbang, Ipsil, Wonwonsa faults faults in the Ulsan fault zone, Yangsan fault in the Yeongdeog area and southeastern coastal area. Rb-Sr and K-Ar data imply that the fault movement of the Ulan fault zone initiated at around 30 Ma and preliminary dating result for the Yang san fault is around 70 Ma in the Yeongdeog area. K-Ar and U-series disequilibrium dating results for fracture infillings in the Ipsil fault are consistent with reported ESR ages. Radiocarbon ages of quaternary sediments from the Jeongjari area are discordant with stratigraphic sequence. Carbon isotope data indicate a difference of sedimentry environment for those samples. Be-10 dating results for the Suryum fault area are consistent with reported OSL results.

  2. Interim storage study report

    Energy Technology Data Exchange (ETDEWEB)

    Rawlins, J.K.

    1998-02-01

    High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration.

  3. ESR dating of fault rocks

    International Nuclear Information System (INIS)

    Lee, Hee Kwon

    2002-03-01

    Past movement on faults can be dated by measurement of the intensity of ESR signals in quartz. These signals are reset by local lattice deformation and local frictional heating on grain contacts at the time of fault movement. The ESR signals then trow back as a result of bombardment by ionizing radiation from surrounding rocks. The age is obtained from the ratio of the equivalent dose, needed to produce the observed signal, to the dose rate. Fine grains are more completely reset during faulting, and a plot of age vs grain size shows a plateau for grains below critical size : these grains are presumed to have been completely zeroed by the last fault activity. We carried out ESR dating of fault rocks collected from the Yangsan fault system. ESR dates from the this fault system range from 870 to 240 ka. Results of this research suggest that long-term cyclic fault activity continued into the pleistocene

  4. ESR dating of fault rocks

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Hee Kwon [Kangwon National Univ., Chuncheon (Korea, Republic of)

    2002-03-15

    Past movement on faults can be dated by measurement of the intensity of ESR signals in quartz. These signals are reset by local lattice deformation and local frictional heating on grain contacts at the time of fault movement. The ESR signals then trow back as a result of bombardment by ionizing radiation from surrounding rocks. The age is obtained from the ratio of the equivalent dose, needed to produce the observed signal, to the dose rate. Fine grains are more completely reset during faulting, and a plot of age vs grain size shows a plateau for grains below critical size : these grains are presumed to have been completely zeroed by the last fault activity. We carried out ESR dating of fault rocks collected from the Yangsan fault system. ESR dates from the this fault system range from 870 to 240 ka. Results of this research suggest that long-term cyclic fault activity continued into the pleistocene.

  5. Spatiotemporal patterns of fault slip rates across the Central Sierra Nevada frontal fault zone

    Science.gov (United States)

    Rood, Dylan H.; Burbank, Douglas W.; Finkel, Robert C.

    2011-01-01

    Patterns in fault slip rates through time and space are examined across the transition from the Sierra Nevada to the Eastern California Shear Zone-Walker Lane belt. At each of four sites along the eastern Sierra Nevada frontal fault zone between 38 and 39° N latitude, geomorphic markers, such as glacial moraines and outwash terraces, are displaced by a suite of range-front normal faults. Using geomorphic mapping, surveying, and 10Be surface exposure dating, mean fault slip rates are defined, and by utilizing markers of different ages (generally, ~ 20 ka and ~ 150 ka), rates through time and interactions among multiple faults are examined over 10 4-10 5 year timescales. At each site for which data are available for the last ~ 150 ky, mean slip rates across the Sierra Nevada frontal fault zone have probably not varied by more than a factor of two over time spans equal to half of the total time interval (~ 20 ky and ~ 150 ky timescales): 0.3 ± 0.1 mm year - 1 (mode and 95% CI) at both Buckeye Creek in the Bridgeport basin and Sonora Junction; and 0.4 + 0.3/-0.1 mm year - 1 along the West Fork of the Carson River at Woodfords. Data permit rates that are relatively constant over the time scales examined. In contrast, slip rates are highly variable in space over the last ~ 20 ky. Slip rates decrease by a factor of 3-5 northward over a distance of ~ 20 km between the northern Mono Basin (1.3 + 0.6/-0.3 mm year - 1 at Lundy Canyon site) to the Bridgeport Basin (0.3 ± 0.1 mm year - 1 ). The 3-fold decrease in the slip rate on the Sierra Nevada frontal fault zone northward from Mono Basin is indicative of a change in the character of faulting north of the Mina Deflection as extension is transferred eastward onto normal faults between the Sierra Nevada and Walker Lane belt. A compilation of regional deformation rates reveals that the spatial pattern of extension rates changes along strike of the Eastern California Shear Zone-Walker Lane belt. South of the Mina Deflection

  6. Geophysical Imaging of Fault Structures Over the Qadimah Fault, Saudi Arabia

    KAUST Repository

    AlTawash, Feras

    2011-06-01

    The purpose of this study is to use geophysical imaging methods to identify the conjectured location of the ‘Qadimah fault’ near the ‘King Abdullah Economic City’, Saudi Arabia. Towards this goal, 2-D resistivity and seismic surveys were conducted at two different locations, site 1 and site 2, along the proposed trace of the ‘Qadimah fault’. Three processing techniques were used to validate the fault (i) 2-D travel time tomography, (ii) resistivity imaging, and (iii) reflection trim stacking. The refraction traveltime tomograms at site 1 and site 2 both show low-velocity zones (LVZ’s) next to the conjectured fault trace. These LVZ’s are interpreted as colluvial wedges that are often observed on the downthrown side of normal faults. The resistivity tomograms are consistent with this interpretation in that there is a significant change in resistivity values along the conjectured fault trace. Processing the reflection data did not clearly reveal the existence of a fault, and is partly due to the sub-optimal design of the reflection experiment. Overall, the results of this study strongly, but not definitively, suggest the existence of the Qadimah fault in the ‘King Abdullah Economic City’ region of Saudi Arabia.

  7. Improving the software fault localization process through testability information

    NARCIS (Netherlands)

    Gonzalez-Sanchez, A.; Abreu, R.; Gross, H.; Van Gemund, A.

    2010-01-01

    When failures occur during software testing, automated software fault localization helps to diagnose their root causes and identify the defective components of a program to support debugging. Diagnosis is carried out by selecting test cases in such way that their pass or fail information will narrow

  8. The distribution of deformation in parallel fault-related folds with migrating axial surfaces: comparison between fault-propagation and fault-bend folding

    Science.gov (United States)

    Salvini, Francesco; Storti, Fabrizio

    2001-01-01

    In fault-related folds that form by axial surface migration, rocks undergo deformation as they pass through axial surfaces. The distribution and intensity of deformation in these structures has been impacted by the history of axial surface migration. Upon fold initiation, unique dip panels develop, each with a characteristic deformation intensity, depending on their history. During fold growth, rocks that pass through axial surfaces are transported between dip panels and accumulate additional deformation. By tracking the pattern of axial surface migration in model folds, we predict the distribution of relative deformation intensity in simple-step, parallel fault-bend and fault-propagation anticlines. In both cases the deformation is partitioned into unique domains we call deformation panels. For a given rheology of the folded multilayer, deformation intensity will be homogeneously distributed in each deformation panel. Fold limbs are always deformed. The flat crests of fault-propagation anticlines are always undeformed. Two asymmetric deformation panels develop in fault-propagation folds above ramp angles exceeding 29°. For lower ramp angles, an additional, more intensely-deformed panel develops at the transition between the crest and the forelimb. Deformation in the flat crests of fault-bend anticlines occurs when fault displacement exceeds the length of the footwall ramp, but is never found immediately hinterland of the crest to forelimb transition. In environments dominated by brittle deformation, our models may serve as a first-order approximation of the distribution of fractures in fault-related folds.

  9. Fault isolatability conditions for linear systems

    DEFF Research Database (Denmark)

    Stoustrup, Jakob; Niemann, Henrik

    2006-01-01

    In this paper, we shall show that an unlimited number of additive single faults can be isolated under mild conditions if a general isolation scheme is applied. Multiple faults are also covered. The approach is algebraic and is based on a set representation of faults, where all faults within a set...... the faults have occurred. The last step is a fault isolation (FI) of the faults occurring in a specific fault set, i.e. equivalent with the standard FI step. A simple example demonstrates how to turn the algebraic necessary and sufficient conditions into explicit algorithms for designing filter banks, which...

  10. Conceptual design report for immobilized high-level waste interim storage facility (Phase 1)

    International Nuclear Information System (INIS)

    Burgard, K.C.

    1998-01-01

    The Hanford Site Canister Storage Building (CSB Bldg. 212H) will be utilized to interim store Phase 1 HLW products. Project W-464, Immobilized High-Level Waste Interim Storage, will procure an onsite transportation system and retrofit the CSB to accommodate the Phase 1 HLW products. The Conceptual Design Report establishes the Project W-464 technical and cost basis

  11. Conceptual design report for immobilized high-level waste interim storage facility (Phase 1)

    Energy Technology Data Exchange (ETDEWEB)

    Burgard, K.C.

    1998-04-09

    The Hanford Site Canister Storage Building (CSB Bldg. 212H) will be utilized to interim store Phase 1 HLW products. Project W-464, Immobilized High-Level Waste Interim Storage, will procure an onsite transportation system and retrofit the CSB to accommodate the Phase 1 HLW products. The Conceptual Design Report establishes the Project W-464 technical and cost basis.

  12. Agenda 21 interim balance, 1997

    Energy Technology Data Exchange (ETDEWEB)

    Van Vuuren, D.P.; Bakkes, J.A.

    1997-10-01

    Five years after the `United Nations Conference on Environment and Development (UNCED)`, an interim balance was drawn up to see what was done to meet the ambitious challenges adopted in Agenda 21 during this conference. Such a balance is presented in this report and the complementary brochure, `Developments in Sustainability 1992-1997`, reflecting societal developments and changes in environmental quality, as well as changes in responses to environmental concerns. 24 figs., 12 tabs., 68 refs.

  13. Linear Programming for Vocational Education Planning. Interim Report.

    Science.gov (United States)

    Young, Robert C.; And Others

    The purpose of the paper is to define for potential users of vocational education management information systems a quantitative analysis technique and its utilization to facilitate more effective planning of vocational education programs. Defining linear programming (LP) as a management technique used to solve complex resource allocation problems…

  14. Generalized fault tree analysis combined with state analysis

    International Nuclear Information System (INIS)

    Caldarola, L.

    1980-02-01

    An analytical theory has been developed which allows one to calculate the occurrence probability of the top event of a fault tree with multistate (two or more than two states) components. It is shown that, in order to correctly describe a system with multistate components, a special type of boolean algebra is required. This is called 'boolean algebra with restrictions on variables' and its basic rules are the same as those of the traditional boolean algebra with some additional restrictions on the variables. These restrictions are extensively discussed in the paper. It is also shown that the boolean algebra with restrictions on variables facilitates the task of formally combining fault tree analysis with state analysis. The computer program MUSTAFA 1 based on the above theory has been developed. It can analyse fault trees of system containing statistically independent as well as dependent components with two or more than two states. MUSTAFA 1 can handle coherent as well as non coherent boolean functions. (orig.) 891 HP/orig. 892 MB [de

  15. Waste management in Canadian nuclear programs

    International Nuclear Information System (INIS)

    Dyne, P.J.

    1975-08-01

    The report describes the wide-ranging program of engineering developments and applications to provide the Canadian nuclear industry with the knowledge and expertise it needs to conduct its waste management program. The need for interim dry storage of spent fuel, and the storage and ultimate disposal of waste from fuel reprocessing are examined. The role of geologic storage in AECL's current waste management program is also considered. (R.A.)

  16. Fault Current Distribution and Pole Earth Potential Rise (EPR) Under Substation Fault

    Science.gov (United States)

    Nnassereddine, M.; Rizk, J.; Hellany, A.; Nagrial, M.

    2013-09-01

    New high-voltage (HV) substations are fed by transmission lines. The position of these lines necessitates earthing design to ensure safety compliance of the system. Conductive structures such as steel or concrete poles are widely used in HV transmission mains. The earth potential rise (EPR) generated by a fault at the substation could result in an unsafe condition. This article discusses EPR based on substation fault. The pole EPR assessment under substation fault is assessed with and without mutual impedance consideration. Split factor determination with and without the mutual impedance of the line is also discussed. Furthermore, a simplified formula to compute the pole grid current under substation fault is included. Also, it includes the introduction of the n factor which determines the number of poles that required earthing assessments under substation fault. A case study is shown.

  17. Stress sensitivity of fault seismicity: A comparison between limited-offset oblique and major strike-slip faults

    Science.gov (United States)

    Parsons, T.; Stein, R.S.; Simpson, R.W.; Reasenberg, P.A.

    1999-01-01

    We present a new three-dimensional inventory of the southern San Francisco Bay area faults and use it to calculate stress applied principally by the 1989 M = 7.1 Loma Prieta earthquake and to compare fault seismicity rates before and after 1989. The major high-angle right-lateral faults exhibit a different response to the stress change than do minor oblique (right-lateral/thrust) faults. Seismicity on oblique-slip faults in the southern Santa Clara Valley thrust belt increased where the faults were unclamped. The strong dependence of seismicity change on normal stress change implies a high coefficient of static friction. In contrast, we observe that faults with significant offset (>50-100 km) behave differently; microseismicity on the Hayward fault diminished where right-lateral shear stress was reduced and where it was unclamped by the Loma Prieta earthquake. We observe a similar response on the San Andreas fault zone in southern California after the Landers earthquake sequence. Additionally, the offshore San Gregorio fault shows a seismicity rate increase where right-lateral/oblique shear stress was increased by the Loma Prieta earthquake despite also being clamped by it. These responses are consistent with either a low coefficient of static friction or high pore fluid pressures within the fault zones. We can explain the different behavior of the two styles of faults if those with large cumulative offset become impermeable through gouge buildup; coseismically pressurized pore fluids could be trapped and negate imposed normal stress changes, whereas in more limited offset faults, fluids could rapidly escape. The difference in behavior between minor and major faults may explain why frictional failure criteria that apply intermediate coefficients of static friction can be effective in describing the broad distributions of aftershocks that follow large earthquakes, since many of these events occur both inside and outside major fault zones.

  18. Performance based fault diagnosis

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik

    2002-01-01

    Different aspects of fault detection and fault isolation in closed-loop systems are considered. It is shown that using the standard setup known from feedback control, it is possible to formulate fault diagnosis problems based on a performance index in this general standard setup. It is also shown...

  19. Deformation associated with continental normal faults

    Science.gov (United States)

    Resor, Phillip G.

    Deformation associated with normal fault earthquakes and geologic structures provide insights into the seismic cycle as it unfolds over time scales from seconds to millions of years. Improved understanding of normal faulting will lead to more accurate seismic hazard assessments and prediction of associated structures. High-precision aftershock locations for the 1995 Kozani-Grevena earthquake (Mw 6.5), Greece image a segmented master fault and antithetic faults. This three-dimensional fault geometry is typical of normal fault systems mapped from outcrop or interpreted from reflection seismic data and illustrates the importance of incorporating three-dimensional fault geometry in mechanical models. Subsurface fault slip associated with the Kozani-Grevena and 1999 Hector Mine (Mw 7.1) earthquakes is modeled using a new method for slip inversion on three-dimensional fault surfaces. Incorporation of three-dimensional fault geometry improves the fit to the geodetic data while honoring aftershock distributions and surface ruptures. GPS Surveying of deformed bedding surfaces associated with normal faulting in the western Grand Canyon reveals patterns of deformation that are similar to those observed by interferometric satellite radar interferometry (InSAR) for the Kozani Grevena earthquake with a prominent down-warp in the hanging wall and a lesser up-warp in the footwall. However, deformation associated with the Kozani-Grevena earthquake extends ˜20 km from the fault surface trace, while the folds in the western Grand Canyon only extend 500 m into the footwall and 1500 m into the hanging wall. A comparison of mechanical and kinematic models illustrates advantages of mechanical models in exploring normal faulting processes including incorporation of both deformation and causative forces, and the opportunity to incorporate more complex fault geometry and constitutive properties. Elastic models with antithetic or synthetic faults or joints in association with a master

  20. Characterization of leaky faults

    International Nuclear Information System (INIS)

    Shan, Chao.

    1990-05-01

    Leaky faults provide a flow path for fluids to move underground. It is very important to characterize such faults in various engineering projects. The purpose of this work is to develop mathematical solutions for this characterization. The flow of water in an aquifer system and the flow of air in the unsaturated fault-rock system were studied. If the leaky fault cuts through two aquifers, characterization of the fault can be achieved by pumping water from one of the aquifers, which are assumed to be horizontal and of uniform thickness. Analytical solutions have been developed for two cases of either a negligibly small or a significantly large drawdown in the unpumped aquifer. Some practical methods for using these solutions are presented. 45 refs., 72 figs., 11 tabs

  1. Spatial analysis of hypocenter to fault relationships for determining fault process zone width in Japan

    International Nuclear Information System (INIS)

    Arnold, Bill Walter; Roberts, Barry L.; McKenna, Sean Andrew; Coburn, Timothy C.

    2004-01-01

    Preliminary investigation areas (PIA) for a potential repository of high-level radioactive waste must be evaluated by NUMO with regard to a number of qualifying factors. One of these factors is related to earthquakes and fault activity. This study develops a spatial statistical assessment method that can be applied to the active faults in Japan to perform such screening evaluations. This analysis uses the distribution of seismicity near faults to define the width of the associated process zone. This concept is based on previous observations of aftershock earthquakes clustered near active faults and on the assumption that such seismic activity is indicative of fracturing and associated impacts on bedrock integrity. Preliminary analyses of aggregate data for all of Japan confirmed that the frequency of earthquakes is higher near active faults. Data used in the analysis were obtained from NUMO and consist of three primary sources: (1) active fault attributes compiled in a spreadsheet, (2) earthquake hypocenter data, and (3) active fault locations. Examination of these data revealed several limitations with regard to the ability to associate fault attributes from the spreadsheet to locations of individual fault trace segments. In particular, there was no direct link between attributes of the active faults in the spreadsheet and the active fault locations in the GIS database. In addition, the hypocenter location resolution in the pre-1983 data was less accurate than for later data. These pre-1983 hypocenters were eliminated from further analysis

  2. Spatial analysis of hypocenter to fault relationships for determining fault process zone width in Japan.

    Energy Technology Data Exchange (ETDEWEB)

    Arnold, Bill Walter; Roberts, Barry L.; McKenna, Sean Andrew; Coburn, Timothy C. (Abilene Christian University, Abilene, TX)

    2004-09-01

    Preliminary investigation areas (PIA) for a potential repository of high-level radioactive waste must be evaluated by NUMO with regard to a number of qualifying factors. One of these factors is related to earthquakes and fault activity. This study develops a spatial statistical assessment method that can be applied to the active faults in Japan to perform such screening evaluations. This analysis uses the distribution of seismicity near faults to define the width of the associated process zone. This concept is based on previous observations of aftershock earthquakes clustered near active faults and on the assumption that such seismic activity is indicative of fracturing and associated impacts on bedrock integrity. Preliminary analyses of aggregate data for all of Japan confirmed that the frequency of earthquakes is higher near active faults. Data used in the analysis were obtained from NUMO and consist of three primary sources: (1) active fault attributes compiled in a spreadsheet, (2) earthquake hypocenter data, and (3) active fault locations. Examination of these data revealed several limitations with regard to the ability to associate fault attributes from the spreadsheet to locations of individual fault trace segments. In particular, there was no direct link between attributes of the active faults in the spreadsheet and the active fault locations in the GIS database. In addition, the hypocenter location resolution in the pre-1983 data was less accurate than for later data. These pre-1983 hypocenters were eliminated from further analysis.

  3. Fault healing promotes high-frequency earthquakes in laboratory experiments and on natural faults

    Science.gov (United States)

    McLaskey, Gregory C.; Thomas, Amanda M.; Glaser, Steven D.; Nadeau, Robert M.

    2012-01-01

    Faults strengthen or heal with time in stationary contact and this healing may be an essential ingredient for the generation of earthquakes. In the laboratory, healing is thought to be the result of thermally activated mechanisms that weld together micrometre-sized asperity contacts on the fault surface, but the relationship between laboratory measures of fault healing and the seismically observable properties of earthquakes is at present not well defined. Here we report on laboratory experiments and seismological observations that show how the spectral properties of earthquakes vary as a function of fault healing time. In the laboratory, we find that increased healing causes a disproportionately large amount of high-frequency seismic radiation to be produced during fault rupture. We observe a similar connection between earthquake spectra and recurrence time for repeating earthquake sequences on natural faults. Healing rates depend on pressure, temperature and mineralogy, so the connection between seismicity and healing may help to explain recent observations of large megathrust earthquakes which indicate that energetic, high-frequency seismic radiation originates from locations that are distinct from the geodetically inferred locations of large-amplitude fault slip

  4. THE IMPORTANCE OF FINANCIAL INTERIM REPORTING FOR THE POSITION OF COMPANIES

    Directory of Open Access Journals (Sweden)

    Claudia‐Elena\tGRIGORAȘ‐ICHIM

    2015-12-01

    Full Text Available The importance that each company must grant to the strategic sources of information generates our concern for analysis of the interim financial reporting. In every enterprise, there are doubts on the usefulness of interim financial reports, given the following elements: the necessary time for their preparation (relatively long, their restricted character and the resources necessary to establish them. Finding a common solution to these problems and, implicitly, increasing the interest for interim financial reporting, can help to increase the economic performance of the company, either by reducing the unnecessary costs related to time, or by increasing communication and transparency with third parties. An appropriate management can act early in the direction of counteracting the negative effects in their company or prevention of any commercial or production failures, the overall economic trends in that field and increasing productivity. Starting from these premises, we propose a research in order to capture the main aspects related to the mentioned issues.

  5. The morphology of strike-slip faults - Examples from the San Andreas Fault, California

    Science.gov (United States)

    Bilham, Roger; King, Geoffrey

    1989-01-01

    The dilatational strains associated with vertical faults embedded in a horizontal plate are examined in the framework of fault kinematics and simple displacement boundary conditions. Using boundary element methods, a sequence of examples of dilatational strain fields associated with commonly occurring strike-slip fault zone features (bends, offsets, finite rupture lengths, and nonuniform slip distributions) is derived. The combinations of these strain fields are then used to examine the Parkfield region of the San Andreas fault system in central California.

  6. Iowa Bedrock Faults

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — This fault coverage locates and identifies all currently known/interpreted fault zones in Iowa, that demonstrate offset of geologic units in exposure or subsurface...

  7. H infinity Integrated Fault Estimation and Fault Tolerant Control of Discrete-time Piecewise Linear Systems

    DEFF Research Database (Denmark)

    Tabatabaeipour, Seyed Mojtaba; Bak, Thomas

    2012-01-01

    In this paper we consider the problem of fault estimation and accommodation for discrete time piecewise linear systems. A robust fault estimator is designed to estimate the fault such that the estimation error converges to zero and H∞ performance of the fault estimation is minimized. Then, the es...

  8. FSN-based fault modelling for fault detection and troubleshooting in CANDU stations

    Energy Technology Data Exchange (ETDEWEB)

    Nasimi, E., E-mail: elnara.nasimi@brucepower.com [Bruce Power LLP., Tiverton, Ontario(Canada); Gabbar, H.A. [Univ. of Ontario Inst. of Tech., Oshawa, Ontario (Canada)

    2013-07-01

    An accurate fault modeling and troubleshooting methodology is required to aid in making risk-informed decisions related to design and operational activities of current and future generation of CANDU designs. This paper presents fault modeling approach using Fault Semantic Network (FSN) methodology with risk estimation. Its application is demonstrated using a case study of Bruce B zone-control level oscillations. (author)

  9. Long-term interim storage concepts with conditioning strategies ensuring compatibility with subsequent disposal or reprocessing

    International Nuclear Information System (INIS)

    Moitrier, C.; Tirel, I.; Villard, C.

    2000-01-01

    The objective of the CEA studies carried out under research topic 3 (long-term interim storage) of the 1991 French radioactive waste management law is to demonstrate the industrial feasibility of a comprehensive, flexible interim storage facility by thoroughly evaluating and comparing all the basic components of various interim storage concepts. In this context, the CEA is considering reference solutions or concepts based on three primary components (the package, the interim storage facility and the site) suitable for determining the specifications of a very long-term solution. Some aspects are examined in greater detail, such as the implementation of long-term technologies, conditioning processes ensuring the absence of water and contamination in the facility, or allowance for radioactive decay of the packages. The results obtained are continually compiled in reports substantiating the design options. These studies should also lead to an overall economic assessment in terms of the capital and operating cost requirements, thereby providing an additional basis for selecting the design options. The comparison with existing industrial facilities highlights the technical and economic progress represented by the new generation of interim storage units. (authors)

  10. Quaternary Geology and Surface Faulting Hazard: Active and Capable Faults in Central Apennines, Italy

    Science.gov (United States)

    Falcucci, E.; Gori, S.

    2015-12-01

    The 2009 L'Aquila earthquake (Mw 6.1), in central Italy, raised the issue of surface faulting hazard in Italy, since large urban areas were affected by surface displacement along the causative structure, the Paganica fault. Since then, guidelines for microzonation were drew up that take into consideration the problem of surface faulting in Italy, and laying the bases for future regulations about related hazard, similarly to other countries (e.g. USA). More specific guidelines on the management of areas affected by active and capable faults (i.e. able to produce surface faulting) are going to be released by National Department of Civil Protection; these would define zonation of areas affected by active and capable faults, with prescriptions for land use planning. As such, the guidelines arise the problem of the time interval and general operational criteria to asses fault capability for the Italian territory. As for the chronology, the review of the international literature and regulatory allowed Galadini et al. (2012) to propose different time intervals depending on the ongoing tectonic regime - compressive or extensional - which encompass the Quaternary. As for the operational criteria, the detailed analysis of the large amount of works dealing with active faulting in Italy shows that investigations exclusively based on surface morphological features (e.g. fault planes exposition) or on indirect investigations (geophysical data), are not sufficient or even unreliable to define the presence of an active and capable fault; instead, more accurate geological information on the Quaternary space-time evolution of the areas affected by such tectonic structures is needed. A test area for which active and capable faults can be first mapped based on such a classical but still effective methodological approach can be the central Apennines. Reference Galadini F., Falcucci E., Galli P., Giaccio B., Gori S., Messina P., Moro M., Saroli M., Scardia G., Sposato A. (2012). Time

  11. Software Verification and Validation Report for the 244-AR Vault Interim Stabilization Ventilation System

    International Nuclear Information System (INIS)

    YEH, T.

    2002-01-01

    This document reports on the analysis, testing and conclusions of the software verification and validation for the 244-AR Vault Interim Stabilization ventilation system. Automation control system will use the Allen-Bradley software tools for programming and programmable logic controller (PLC) configuration. The 244-AR Interim Stabilization Ventilation System will be used to control the release of radioactive particles to the environment in the containment tent, located inside the canyon of the 244-AR facility, and to assist the waste stabilization efforts. The HVAC equipment, ducts, instruments, PLC hardware, the ladder logic executable software (documented code), and message display terminal are considered part of the temporary ventilation system. The system consists of a supply air skid, temporary ductwork (to distribute airflow), and two skid-mounted, 500-cfm exhausters connected to the east filter building and the vessel vent system. The Interim Stabilization Ventilation System is a temporary, portable ventilation system consisting of supply side and exhaust side. Air is supplied to the containment tent from an air supply skid. This skid contains a constant speed fan, a pre-filter, an electric heating coil, a cooling coil, and a constant flow device (CFD). The CFD uses a passive component that allows a constant flow of air to pass through the device. Air is drawn out of the containment tent, cells, and tanks by two 500-cfm exhauster skids running in parallel. These skids are equipped with fans, filters, stack, stack monitoring instrumentation, and a PLC for control. The 500CFM exhaust skids were fabricated and tested previously for saltwell pumping activities. The objective of the temporary ventilation system is to maintain a higher pressure to the containment tent, relative to the canyon and cell areas, to prevent contaminants from reaching the containment tent

  12. Application of dose evaluation of the MCNP code for interim spent fuel cask storage facility

    International Nuclear Information System (INIS)

    Kosako, Toshiso; Iimoto, Takeshi; Ishikawa, Satoshi; Tsuboi, Takafumi; Teramura, Masahiro; Okamura, Tomomi; Narumiya, Yoshiyuki

    2007-01-01

    The interim storage facility for spent fuel metallic cask is designed as a concrete building structure with air inlet and outlet for circulating the natural cooling. The feature of the interim storage facility is big capacity of spent fuel at several thousands MTU and restricted site usage. It is important to evaluate realistic dose rate in shielding design of the interim storage facility, therefore the three-dimensional continuous-energy Monte Carlo radiation transport code MCNP that exactly treating the complicated geometry was applied. The validation of dose evaluation for interim storage facility by MCNP code were performed by three kinds of neutron shielding benchmark experiments; cask shadow shielding experiment, duct streaming experiment and concrete deep penetration experiment. Dose rate distributions at each benchmark were measured and compared with the calculated results. The comparison showed a good consistency between calculation and experiment results. (author)

  13. Interim data report for the safety assessment SR-Can

    International Nuclear Information System (INIS)

    Vahlund, Fredrik; Andersson, Johan

    2004-08-01

    This document is the interim data report in the project SR-Can. The purpose of the data report is to present input data, with uncertainty estimates, for the SR-Can assessment calculations. Besides input data, the report also describes the standardised procedures used when deriving the input data and the corresponding uncertainty estimates. However, in the present interim version of the report (written in the initial stage of the project when site characterisation has yet not been completed) the standardised procedures have not been possible to apply for most of the data and, in order to present a compilation of the data used in the assessment, much of the input data is presented without following the standardised procedures. This will however be changed for the final version of the SR-Can data report, in order to show the methodology that will be used in the final version one example of how input data will be presented is included (migration data for buffer) . The recommended input data for the assessment calculations are, for the interim version, mainly based on SR 97 Beberg data, these are merely presented without any background or uncertainty discussion (this is presented in the SR 97 data report)

  14. Fault detection in finite frequency domain for Takagi-Sugeno fuzzy systems with sensor faults.

    Science.gov (United States)

    Li, Xiao-Jian; Yang, Guang-Hong

    2014-08-01

    This paper is concerned with the fault detection (FD) problem in finite frequency domain for continuous-time Takagi-Sugeno fuzzy systems with sensor faults. Some finite-frequency performance indices are initially introduced to measure the fault/reference input sensitivity and disturbance robustness. Based on these performance indices, an effective FD scheme is then presented such that the generated residual is designed to be sensitive to both fault and reference input for faulty cases, while robust against the reference input for fault-free case. As the additional reference input sensitivity for faulty cases is considered, it is shown that the proposed method improves the existing FD techniques and achieves a better FD performance. The theory is supported by simulation results related to the detection of sensor faults in a tunnel-diode circuit.

  15. Fault detection for discrete-time switched systems with sensor stuck faults and servo inputs.

    Science.gov (United States)

    Zhong, Guang-Xin; Yang, Guang-Hong

    2015-09-01

    This paper addresses the fault detection problem of switched systems with servo inputs and sensor stuck faults. The attention is focused on designing a switching law and its associated fault detection filters (FDFs). The proposed switching law uses only the current states of FDFs, which guarantees the residuals are sensitive to the servo inputs with known frequency ranges in faulty cases and robust against them in fault-free case. Thus, the arbitrarily small sensor stuck faults, including outage faults can be detected in finite-frequency domain. The levels of sensitivity and robustness are measured in terms of the finite-frequency H- index and l2-gain. Finally, the switching law and FDFs are obtained by the solution of a convex optimization problem. Copyright © 2015 ISA. Published by Elsevier Ltd. All rights reserved.

  16. Late quaternary faulting along the Death Valley-Furnace Creek fault system, California and Nevada

    International Nuclear Information System (INIS)

    Brogan, G.E.; Kellogg, K.S.; Terhune, C.L.; Slemmons, D.B.

    1991-01-01

    The Death Valley-Furnace Creek fault system, in California and Nevada, has a variety of impressive late Quaternary neotectonic features that record a long history of recurrent earthquake-induced faulting. Although no neotectonic features of unequivocal historical age are known, paleoseismic features from multiple late Quaternary events of surface faulting are well developed throughout the length of the system. Comparison of scarp heights to amount of horizontal offset of stream channels and the relationships of both scarps and channels to the ages of different geomorphic surfaces demonstrate that Quaternary faulting along the northwest-trending Furnace Creek fault zone is predominantly right lateral, whereas that along the north-trending Death Valley fault zone is predominantly normal. These observations are compatible with tectonic models of Death Valley as a northwest- trending pull-apart basin

  17. Characterization of the San Andreas Fault near Parkfield, California by fault-zone trapped waves

    Science.gov (United States)

    Li, Y.; Vidale, J.; Cochran, E.

    2003-04-01

    In October, 2002, coordinated by the Pre-EarthScope/SAFOD, we conducted an extensive seismic experiment at the San Andreas fault (SAF), Parkfield to record fault-zone trapped waves generated by explosions and microearthquakes using dense linear seismic arrays of 52 PASSCAL 3-channel REFTEKs deployed across and along the fault zone. We detonated 3 explosions within and out of the fault zone during the experiment, and also recorded other 13 shots of PASO experiment of UWM/RPI (Thurber and Roecker) detonated around the SAFOD drilling site at the same time. We observed prominent fault-zone trapped waves with large amplitudes and long duration following S waves at stations close to the main fault trace for sources located within and close to the fault zone. Dominant frequencies of trapped waves are 2-3 Hz for near-surface explosions and 4-5 Hz for microearthquakes. Fault-zone trapped waves are relatively weak on the north strand of SAF for same sources. In contrast, seismograms registered for both the stations and shots far away from the fault zone show a brief S wave and lack of trapped waves. These observations are consistent with previous findings of fault-zone trapped waves at the SAF [Li et al., 1990; 1997], indicating the existence of a well-developed low-velocity waveguide along the main fault strand (principal slip plan) of the SAF. The data from denser arrays and 3-D finite-difference simulations of fault-zone trapped waves allowed us to delineate the internal structure, segmentation and physical properties of the SAF with higher resolution. The trapped-wave inferred waveguide on the SAF Parkfield segment is ~150 m wide at surface and tapers to ~100 m at seismogenic depth, in which Q is 20-50 and S velocities are reduced by 30-40% from wall-rock velocities, with the greater velocity reduction at the shallow depth and to southeast of the 1966 M6 epicenter. We interpret this low-velocity waveguide on the SAF main strand as being the remnant of damage zone caused

  18. 22 CFR 17.3 - Fault.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Fault. 17.3 Section 17.3 Foreign Relations...) § 17.3 Fault. A recipient of an overpayment is without fault if he or she performed no act of... agency may have been at fault in initiating an overpayment will not necessarily relieve the individual...

  19. Fault Diagnosis and Fault-tolerant Control of Modular Multi-level Converter High-voltage DC System

    DEFF Research Database (Denmark)

    Liu, Hui; Ma, Ke; Wang, Chao

    2016-01-01

    of failures and lower the reliability of the MMC-HVDC system. Therefore, research on the fault diagnosis and fault-tolerant control of MMC-HVDC system is of great significance in order to enhance the reliability of the system. This paper provides a comprehensive review of fault diagnosis and fault handling...

  20. Interim Storage Facility decommissioning. Final report

    International Nuclear Information System (INIS)

    Johnson, R.P.; Speed, D.L.

    1985-01-01

    Decontamination and decommissioning of the Interim Storage Facility were completed. Activities included performing a detailed radiation survey of the facility, removing surface and imbedded contamination, excavating and removing the fuel storage cells, restoring the site to natural conditions, and shipping waste to Hanford, Washington, for burial. The project was accomplished on schedule and 30% under budget with no measurable exposure to decommissioning personnel