WorldWideScience

Sample records for falls hydroelectric project

  1. 76 FR 28024 - Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference

    Science.gov (United States)

    2011-05-13

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference a. Date and Time of Meeting: Tuesday, May 24, 2011 at 10 a.m. (Mountain Time). b. Place: By...

  2. Small-Scale Hydroelectric Power Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Gleeson, L.

    1991-12-01

    The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

  3. Hydroelectric development project at Thompson Falls on the Franquelin River : public inquiry report; Projet d'amenagement hydroelectrique des chutes a Thompson sur la riviere Franquelin : rapport d'enquete et d'audience publique

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-08-15

    Quebec's environmental public hearing board, the Bureau d'audiences publiques sur l'environnement (BAPE), met with the citizens in the municipality of Franquelin to hear their views on the proposed development of a hydroelectric generating station at the Thompson Falls on the Franquelin River. The hydroelectric project is being developed in collaboration with the Franquelin River Energy Society and the Group Axor Inc. It involves the construction of an 83 metre long, 8 metre high dam at the crest of the falls. The water level upstream of the dam would increase by 3 metres. The flood waters would create a water reservoir. The generating station would have a generating capacity of 8.8 MW with an annual electricity production of 33,200 MW. The promoter has also proposed the construction of bike paths and walking paths along the river. The participants at the public hearing were in general agreement with the development, although some expressed concern about fish and wildlife. However, in general they agreed that the project would be a strong economic force for the municipality with good fiscal benefits for the town. The project would also contribute to a more stable supply of potable water. If accepted, the construction would begin in 2009. refs., tabs., figs.

  4. High Falls Hydroelectric Plant feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Diezemann, Gustav A.

    1979-07-01

    This study was made in order to determine if re-activating the retired High Falls Hydro Station in New York would result in a more economical generation of some of the power required in the Central Hudson System than is being obtained with the oil-burning thermal plants. The findings show that the construction of a new plant is more economical than rehabilitation of the existing station. All new construction schemes are marginally unattractive at today's costs but are found to become profitable within a short period as alternative energy sources escalate in price. A new powerhouse with an installed capacity of 2390 kW proved most economical, and its construction is recommended.

  5. Hiilangaay Hydroelectric Project – Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Twitchell, Sara [HDR, Omaha, NE (United States); Stimac, Michael [HDR, Omaha, NE (United States); Lang, Lisa [Haida Corporation, Hydaburg, AK (United States); Witwer, Doreen [Haida Corporation, Hydaburg, AK (United States); Jameson, Vincent [Haida Corporation, Hydaburg, AK (United States)

    2016-06-01

    The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible to move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy

  6. Small-Scale Hydroelectric Power Demonstration Project. Pennsylvania Hydroelectric Development Corporation Flat Rock Dam: Project summary report

    Energy Technology Data Exchange (ETDEWEB)

    Gleeson, L.

    1991-12-01

    The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

  7. Jackson Bluff Hydroelectric Project. Feasibility assessment report

    Energy Technology Data Exchange (ETDEWEB)

    1979-03-01

    A feasibility assessment study was conducted to determine if it is economical to reinstall hydroelectric generating units at the existing Jackson Bluff Dam on the Ochlockonee River in Florida. The studies and investigations have included site reconnaissance, system loads, growth rate, site hydrology, conceptual project arrangements and layouts, power output, estimates of construction costs and annual costs, economic analyses, development of a design and construction schedule and a preliminary environmental review of the proposed Project. It was concluded that the Project poses no unusual technical problems and no significant adverse environmental effects are anticipated. It shows sufficient promise of technical, economic and financial feasibility, to justify the City entering into the next phase of work, the FERC License Application, as soon as possible. The site can be restored for an investment of $9.9 to $10.4 million to establish 8.8 MW of capacity and produce 24,920 MWh of electrical energy annually, and in 10 years would save over $4 million as compared with current fuel costs for operating an oil-fueled power plant. (LCL)

  8. Lawrence hydroelectric project: resurrection of a low-head dam

    Energy Technology Data Exchange (ETDEWEB)

    1982-04-01

    The Lawrence Hydroelectric Project, located on the Merrimac River in Lawrence, Mass, is one of the first hydro projects completed since the oil crisis and has set an important precedent for the development of other low-head generation systems in New England. The hydroelectric project is built alongside the old 920-ft-long granite dam. The plant uses two bulb-type Kaplan turbine/generator units, each rated at 8.4 MW.

  9. Hydroelectric power potential, Woonsocket Falls Dam, Woonsocket, Rhode Island

    Energy Technology Data Exchange (ETDEWEB)

    Daly, J C; Dowdell, R B; Kelly, W E; Koveos, P E; Krikorian, Jr, J S; Lengyel, G; Prince, M J; Seely, S; Tromp, L; Urish, D W

    1979-01-01

    The feasibility of developing a hydroelectric power plant at an existing flood control dam of the city of Woonsocket, RI was examined considering environmental, economic, technical and engineering factors. It was concluded that the City should proceed with plans to develop a hydro plant. (LCL)

  10. Hydroelectric project impacts on Stikine River ecosystems: An overview

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The report provides an overview on the hydroelectric project impacts on Stikine river ecosystems. The objective of this study was to develop a report which would aid...

  11. Hoopa Valley Small Scale Hydroelectric Feasibility Project

    Energy Technology Data Exchange (ETDEWEB)

    Curtis Miller

    2009-03-22

    This study considered assessing the feasibility of developing small scale hydro-electric power from seven major tributaries within the Hoopa Valley Indian Reservation of Northern California (http://www.hoopa-nsn.gov/). This study pursued the assessment of seven major tributaries of the Reservation that flow into the Trinity River. The feasibility of hydropower on the Hoopa Valley Indian Reservation has real potential for development and many alternative options for project locations, designs, operations and financing. In order to realize this opportunity further will require at least 2-3 years of intense data collection focusing on stream flow measurements at multiple locations in order to quantify real power potential. This also includes on the ground stream gradient surveys, road access planning and grid connectivity to PG&E for sale of electricity. Imperative to this effort is the need for negotiations between the Hoopa Tribal Council and PG&E to take place in order to finalize the power rate the Tribe will receive through any wholesale agreement that utilizes the alternative energy generated on the Reservation.

  12. Systematic Sustainability Assessment (SSA) Tool for Hydroelectric Project in Malaysia

    Science.gov (United States)

    Turan, Faiz Mohd; Johan, Kartina

    2017-08-01

    Sustainably developed and managed hydropower has enormous potential to contribute to global sustainability goals. It is known that hydroelectricity contributing small amounts to greenhouse gas emissions and other atmospheric pollutants. However, developing the remaining hydroelectric potential offers many challenges, and public pressure and expectations on the environmental and social performance of hydroelectric tend to increase over time. This paper aims to develop Systematic Sustainability Assessment (SSA) Tool that promotes and guides more sustainable hydroelectric projects in the context of Malaysia. The proposed SSA tool which not only provide a quality and quantitative report of sustainability performance but also act as Self-Assessment Report (SAR) to provide roadmap to achieve greater level of sustainability in project management for continuous improvement. It is expected to provide a common language that allow government, civil society, financial institutions and the hydroelectric sector to talk about and evaluate sustainability issues. The advantage of SSA tool is it can be used at any stage of hydroelectric development, from the earliest planning stages right through to operation.

  13. 78 FR 26358 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2013-05-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy...), on the Eagle Mountain Pumped Storage Hydroelectric Project. e. All local, state, and federal...

  14. 76 FR 22393 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Cancellation...

    Science.gov (United States)

    2011-04-21

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy... and Wildlife Service for the proposed Eagle Mountain Pumped Storage Hydroelectric Project....

  15. 76 FR 81929 - South Carolina Public Service Authority; Notice of Workshop for Santee Cooper Hydroelectric Project

    Science.gov (United States)

    2011-12-29

    ... Cooper Hydroelectric Project On May 26 and November 8, 2011, Commission staff met with representatives of...), licensee for the Santee-Cooper Hydroelectric Project No. 199, to discuss what is needed to complete...

  16. 76 FR 25330 - Georgia Power Company; Project No. 485-063-Georgia and Alabama, Bartletts Ferry Hydroelectric...

    Science.gov (United States)

    2011-05-04

    ... Ferry Hydroelectric Project; Notice of Proposed Restricted Service List for a Programmatic Agreement... inclusion in, the National Register of Historic Places at the existing Bartletts Ferry Hydroelectric Project...

  17. 78 FR 35630 - Martin Dam Hydroelectric Project; Notice of Availability of the Draft Environmental Impact...

    Science.gov (United States)

    2013-06-13

    ... Energy Regulatory Commission Martin Dam Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Martin Dam Hydroelectric Project and Intention To Hold Public Meetings In... reviewed the application for license for the Martin Dam Hydroelectric Project (FERC No. 349), located...

  18. 77 FR 38796 - Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted...

    Science.gov (United States)

    2012-06-29

    ... Energy Regulatory Commission Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of... that could be affected by issuance of a new license for the Bartletts Ferry Hydroelectric Project No... list for the Bartletts Ferry Hydroelectric Project. On June 14, 2012, the Kialegee Tribal Town...

  19. The Pergau hydroelectric project. Pt. 2: Civil engineering construction

    Energy Technology Data Exchange (ETDEWEB)

    McEwan, E.; Idiculla, J.; Patel, R. [Balfour Beatty Cementation Joint Venture, Sidcup (United Kingdom)

    1997-09-01

    The Pergau Hydroelectric Project was built as a design and construct contract in Northern Peninsular Malaysia by an Anglo-Malaysian joint venture with funding assistance provided by the British Government. The project is located approximately 100 km west of the Kelantan State capital of Kota Bharu. This paper describes the contractor`s mobilization for the 600 MW hydroelectric project and the general construction requirements for the project. Although each section of the works had its own particular problems of construction, this paper concentrates on the following three areas that were critical in meeting the key dates for completion: the powerhouse and power tunnels; the power shaft; the Kuala Yong dam. It also includes a brief description of the tunnelling methods used. (author)

  20. Training in Costa Rica[Angostura hydroelectric project

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2001-02-01

    This article reports on the construction of the Angostura hydroelectric project using three newly delivered computerised, self-contained grout mixing stations. The 177MW Angostura project on the Rio Reventazon is described, and the geology of the region, and the training of employees in drilling techniques, mortar and mortar mixing, and grouting are discussed. Details are given of the headrace tunnel, the grouting equipment and operation, and the three drilling and grouting patterns used.

  1. 77 FR 47628 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting...

    Science.gov (United States)

    2012-08-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy... Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage Hydroelectric...

  2. 77 FR 23242 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2012-04-18

    ... the Banks Lake Pumped Storage Project (Banks Lake Project or project) to be located on Banks Lake and... Energy Regulatory Commission Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit... December 1, 2011, the Grand Coulee Project Hydroelectric Authority filed an application for a preliminary...

  3. Tazimina Hydroelectric Project, Iliamna, Alaska Final Technical and Construction Cost Report

    Energy Technology Data Exchange (ETDEWEB)

    HDR Alaska, Inc.

    1998-11-01

    The Iliamna-Newhalen-Nondalton Electric Cooperative (INNEC) provides electrical power to three communities of the same names. These communities are located near the north shore of Iliamna Lake in south-central Alaska approximately 175 miles southwest of Anchorage. These communities have a combined population of approximately 600 residents. There is no direct road connection from these villages to larger population centers. Electric power has been generated by INNEC since 1983 using diesel generators located in the community of Newhalen. Fuel for these generators was transported up the Kvichak River, an important salmon river, and across Iliamna Lake. In dry years the river is low and fuel is flown into Iliamna and then trucked five miles into Newhalen. The cost, difficult logistics and potential spill hazard of this fuel was a primary reason for development of hydroelectric power in this area. A hydroelectric project was constructed for these communities, starting in the spring of 1996 and ending in the spring of 1998. The project site is at Tazimina Falls about 9 miles upstream of the confluence of the Tazimina River and the Newhalen River. The project has an installed capacity of 824 kilowatts (kW) and is expandable to 1.5 megawatts (MW). The project is run-of-the-river (no storage) and uses the approximately 100 feet of natural head provided by the falls. The project features include a channel control sill, intake structure, penstock, underground powerhouse, tailrace, surface control building, buried transmission line and communication cable, and access road.

  4. Financing of private small scale hydroelectric projects

    Energy Technology Data Exchange (ETDEWEB)

    Smukler, L.M.

    1981-03-01

    This manual is a description of the financing process associated with the private development of SSH projects. It examines the institutional framework and the actors within that framework who will have vital impact upon the potential for success of a project. The manual describes the information a developer should obtain in order to make intelligent decisions concerning the multiple directions in which project development can proceed. This information should assist the developer in formulating a business plan. Factors to be considered in choosing a business organizational form are discussed. Included is an analysis of the federal income tax factors relevant to SSH in context of the treatment of specific items: business expenses, depreciation, the Investment Tax Credit, and the Energy Tax Credit as modified by COWPTA. In addition, the tax and organizational factors are applied to an analysis of two mechanisms which can lower development costs through maximum utilization of available tax benefits: limited partnerships and leveraged leases. The manual lists and analyzes the major sources of debt and equity financing that are potentially available to a developer. Finally, all the previously discussed pieces are put together and how the decisions relating to such factors as marketing, taxation and debt financing interrelate to determine the probable success and profitability of a project are investigated. Furthermore, this part of the manual will provide an illustrated guide to understanding the financing process, leading the reader through the decisionmaking and negotiation points, and highlighting what should be borne in mind, what a developer may be giving up and what the perspective of other key actors will be at those points.

  5. Risk assessment method of major unsafe hydroelectric project

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    Based on the characteristics of major unsafe hydroelectric projects and the data from field detection, in situ monitoring, and regular safety inspection, the funda-mental principles of operation risk assessment are proposed in this paper. Mean-while, a three layer hierarchical system is constructed, and an improved analytical hierarchical process combining genetic algorithm and analytical hierarchical process is established, with corresponding program. The operation risk of some unsafe dam was assessed with the principles, method and program presented in this paper and the major factors which would affect the operation of the dam were pointed out.

  6. Risk assessment method of major unsafe hydroelectric project

    Institute of Scientific and Technical Information of China (English)

    WU ZhongRu; SU HuaiZhi; GUO HaiQing

    2008-01-01

    Based on the characteristics of major unsafe hydroelectric projects and the data from field detection, in situ monitoring, and regular safety inspection, the funda- menial principles of operation risk assessment are proposed in this paper. Mean- while, a three layer hierarchical system is constructed, and an improved analytical hierarchical process combining genetic algorithm and analytical hierarchical process is established, with corresponding program. The operation risk of some unsafe dam was assessed with the principles, method and program presented in this paper and the major factors which would affect the operation of the dam were pointed out.

  7. 76 FR 20657 - Wells Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement...

    Science.gov (United States)

    2011-04-13

    ... Energy Regulatory Commission Wells Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Wells Hydrolectric Project and Intention To Hold Public Meetings In... Office of Energy Projects has reviewed the application for license for the Wells Hydroelectric...

  8. 76 FR 67178 - Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement...

    Science.gov (United States)

    2011-10-31

    ... Energy Regulatory Commission Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement for the Wells Hydrolectric Project In accordance with the National Environmental... reviewed the application for license for the Wells Hydroelectric Project (FERC No. 2149), located on...

  9. 78 FR 25263 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2013-04-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy... Power Act), on the Eagle Mountain Pumped Storage Hydroelectric Project. e. All local, state, and...

  10. 77 FR 43280 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2012-07-24

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy... Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage Hydroelectric Project. e....

  11. Stock participation in hydroelectric projects; Hacia una participacion accionaria en los proyectos hidroelectricos

    Energy Technology Data Exchange (ETDEWEB)

    Robinson, Scott S. [Universidad Metropolitana, Iztapalapa (Mexico). Dept. de Antropologia

    1996-12-31

    This work talks about the way the hydroelectric companies deal with the moving of people for reservoir construction. It happens trough an authoritarian way without a previous communication with the people that will be moved what make them resist. The proposal of author is make people that will be affected by the hydroelectric construction participate in the benefices it will generate. It happened in the construction of hydroelectric project in Pangue, Chile, with good results

  12. Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

    Energy Technology Data Exchange (ETDEWEB)

    Taddeucci, Joe [Dept. of Public Works, Boulder, CO (United States). Utilities Division

    2013-03-29

    The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a

  13. Raptor observations associated with Terror Lake hydroelectric project: 1984 annual progress report

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Raptors in the vicinity of the Terror Lake Hydroelectric Project (TLHP) were studied to determine the effects of project construction and operation on nesting and...

  14. Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

    Energy Technology Data Exchange (ETDEWEB)

    Taddeucci, Joe [Dept. of Public Works, Boulder, CO (United States). Utilities Division

    2013-03-29

    The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a

  15. Raptor observations associated with Terror Lake Hydroelectric Project: 1983 annual progress report

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The report discusses the modification to both bald eagles and rough-legged hawk nesting behavior seen in the Terror Lake Hydroelectric Project area during 1983. A...

  16. Canton hydroelectric project: feasibility study. Final report, appendices

    Energy Technology Data Exchange (ETDEWEB)

    1979-05-01

    These appendices contain legal, environmental, regulatory, technical and economic information used in evaluating the feasibility of redeveloping the hydroelectric power generating facilities at the Upper and Lower Dams of the Farmington River at Collinsville, CT. (LCL)

  17. Environmental mitigation at hydroelectric projects. Volume 2, Benefits and costs of fish passage and protection

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E.; Rinehart, B.N.; Sommers, G.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Cada, G.F.; Jones, D.W. [Oak Ridge National Lab., TN (United States); Dauble, D.D. [Pacific Northwest Lab., Richland, WA (United States); Hunt, R.T. [Hunt (Richard) Associates, Inc., Concord, NH (United States); Costello, R.J. [Northwest Water Resources Advisory Services (United States)

    1994-01-01

    This study examines envirorunental mitigation practices that provide upstream and downstream fish passage and protection at hydroelectric projects. The study includes a survey of fish passage and protection mitigation practices at 1,825 hydroelectric plants regulated by the Federal Energy Regulatory Commission (FERC) to determine frequencies of occurrence, temporal trends, and regional practices based on FERC regions. The study also describes, in general terms, the fish passage/protection mitigation costs at 50 non-Federal hydroelectric projects. Sixteen case studies are used to examine in detail the benefits and costs of fish passage and protection. The 16 case studies include 15 FERC licensed or exempted hydroelectric projects and one Federally-owned and-operated hydroelectric project. The 16 hydroelectric projects are located in 12 states and range in capacity from 400 kilowatts to 840 megawatts. The fish passage and protection mitigation methods at the case studies include fish ladders and lifts, an Eicher screen, spill flows, airburst-cleaned inclined and cylindrical wedgewire screens, vertical barrier screens, and submerged traveling screens. The costs, benefits, monitoring methods, and operating characteristics of these and other mitigation methods used at the 16 case studies are examined.

  18. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack; Hwang, Diana

    1984-11-01

    This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

  19. 77 FR 10740 - Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC, Riverbank Hydro No...

    Science.gov (United States)

    2012-02-23

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95... Friends Fund XVIII for Project No. 14261-000, Upper Hydroelectric, LLC for Project No. 14268-000,...

  20. Interrelations of the Caroni River Basin ecosystems and hydroelectric power projects

    Energy Technology Data Exchange (ETDEWEB)

    Morales, L.C.; Gorzula, S.

    The Caroni is the river with the greatest hydroelectric potential in Venezuela. Large scale hydroelectric projects produce environmental impacts upstream from the dam, due to the formation of an artificial lake, and downstream from the dam, by regulating the river's flow rate. The useful life of a dam for the production of hydroelectricity depends on the rate at which it fills up with sediments, and it's efficiency depends on the maintenance of the hydrological and limnological conditions upon which it was designed. These parameters must be monitored for the duration of the project, and any changes in them must be evaluated. Both environmental impact evaluation and river basin management require basic data about the ecosystems that make up the river basin. However, both the type and detail of the required research to produce base line data must be defined carefully.

  1. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Washington Facilities (Intrastate) Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack

    1984-11-01

    This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.

  2. 76 FR 15971 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Teleconference

    Science.gov (United States)

    2011-03-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy... Eagle Crest Energy as part of its on-going Section 7 Endangered Species Act consultation efforts. e....

  3. 76 FR 22699 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Teleconference

    Science.gov (United States)

    2011-04-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy... Eagle Crest Energy as part of its on-going Section 7 Endangered Species Act consultation efforts. e....

  4. 77 FR 21556 - Don Pedro Hydroelectric Project: Turlock Irrigation District; Modesto Irrigation District...

    Science.gov (United States)

    2012-04-10

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Don Pedro Hydroelectric Project: Turlock Irrigation District; Modesto... Tuolumne Habitats for Anadromous Fish; Request 8--Salmon and Steelhead Full Life-Cycle Population Models...

  5. Legal obstacles and incentives to the development of small scale hydroelectric projects in Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small scale hydroelectric energy at the state level are discussed. The discussion is designed to aid the developer in the determination of which permits, licenses, and laws of the state must be secured or complied with for the development of a project. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. Specific sections that follow are: Massachusetts Water Law; Licensing, Permitting, and Review Procedures; Indirect Considerations (by departments); Department of Public Utilities Regulation of Privately Owned Electric Utilities; Massachusetts Municipal Wholesale Electric Company; Miscellaneous Legal Issues Relating to Low-Head Hydroelectric Power; and Financial Considerations.

  6. Feasibility of restoring the Greggs Falls site to active service as a low-head hydroelectric facility

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, Jr., Robert W.

    1979-08-16

    A study was conducted to determine the feasibility of restoring to service the deactivated Greggs Falls hydroelectric station in Goffstown, New Hampshire. Evaluation of technical, economic, legal, institutional, and environmental factors led to the conclusion that restoration was both feasible and attractive. The site can be restored for an investment of $2.1 to $2.4 million (depending on the operational mode) to establish 1.5 MW of capacity and produce 7945 MWh of electrical energy annually. Within 3 years, operation of the site can produce energy at lower costs than the cost of fuel oil in New England and will save approximately 14,600 barrels of fuel oil annually. The economic competitiveness of the facility is expected to improve with time because of the rising price of imported oil.

  7. Impact of hydroelectric projects on river environment: Analysis of water quality changes in Ningxia Reach of Yellow River

    OpenAIRE

    Sun Dongpo; Lu Ruili; Song Yongjun; Yan Jun

    2008-01-01

    In this paper, the relationship between hydroelectric projects and the river environment is analyzed. Recently, the large-scale regulation of runoff by large hydroelectric projects in the Ningxia Reach of the Yellow River has altered natural runoff processes, causing an increase in the probability of low discharge and an overall adjustment of riverbed evolution and river characteristics. During low-flow years, the combined effects of these two changes can weaken the self-purification capacity...

  8. Project finance of hydroelectric power plants in Brazil; 'Project finance' de usinas hidroeletricas no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro Filho, Valfredo de Assis; Ramos, Maria Olivia de Souza [Universidade Salvador (UNIFACS), BA (Brazil)

    2008-07-01

    The aim of this paper is to discuss the modality of project finance of financing of enterprises, which is the main modality of structuring of hydroelectric projects in Brazil. In the discussion will be highlighted the importance of contracts EPC (Engineering, Search and Construction) in the structuring of project finances. This financing model has particular characteristics related to risk sharing and financial flexibility that enable the financing of projects with long-term capital, however, due to participation of various actors and the nature of the structure of project finance, the negotiation and drafting of contracts are always very complex.

  9. Salient electrical design features of the Magat Hydroelectric Project

    Energy Technology Data Exchange (ETDEWEB)

    Verma, R.; Samorio, R.

    1986-01-01

    The Magat River Multipurpose project on the Luzon grid of the National Power Corporation of the Philippines consists of a four unit 450 MVA power-plant placed in service towards end of year 1983 and early 1984, providing an additional installed capacity of 360 MW to the existing generation peak capacity of 2478 MW of the Luzon grid, which is the country's Largest grid with an installed capacity of 3906 MW, the other two being those of Visayas and Mindanao with a total installed capacity of 1095 MW.

  10. Environmental Impact Assessment: Uri hydroelectric power project on River Jhelum in Kashmir, India

    Energy Technology Data Exchange (ETDEWEB)

    Nyman, L.

    1995-09-01

    This report is an Initial Aquatic Environmental Impact Assessment of the Uri Hydroelectric Power Project on River Jhelum in Kashmir, India. It includes the Terms of Reference of the assessment, a discussion on biodiversity and threats to it, the environmental indicators used to monitor and predict the impacts, a description of the physical, chemical and biological prerequisites of the River Jhelum ecosystem, a description of the survey sites chosen, and an overview of the present fish and bottom fauna. Finally, there are sections on the potential impacts on biota of the Uri Project and a list of proposals for how mitigating and enhancing measures could be enforced

  11. Salient electrical design features of the Magat hydroelectric project

    Energy Technology Data Exchange (ETDEWEB)

    Verma, R.; Samorio, R.

    1987-06-01

    The Magat River Multipurpose project on the Luzon grid of the National Power Corporation of the Philippines consists of a four unit 450 MVA powerplant placed in service towards end of year 1983 and early 1984, providing an additional installed capacity of 360 MW to the existing generation peak capacity of 2478 MW (1) of the Luzon grid, which is the country's largest grid with an installed capacity of 3906 MW, the other two being those of Visayas and Mindanao with a total installed capacity of 1095 MW. This paper describes the salient features of the electrical design including the main generation and station service single line schemes, the principal equipment parameters and layout, control and protection schemes and grounding system of the power plant.

  12. Management Strategy for Hydroelectric Project Toro 2: Knowing and enhancing natural resources sustainably

    Directory of Open Access Journals (Sweden)

    José Pereira Chaves

    2014-01-01

    Full Text Available The aim of this article is to understand and sustainably enhance the biological and ecological resources of the Hydroelectric Project of Toro 2, thus; a research was carried out to inventory the presence of birds, mammals and plants, in order to know if the site qualifies as a biological tourist attraction, as well as to know the opinion of local people. It is proposed the sustainable uses of natural resources, through a strategy of use, management and conservation of the ecosystems.

  13. Standardization of electric projects of small hydroelectric power plants; Padronizacao de projetos eletricos de pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Roberth dos Santos

    2002-07-01

    This work presents a standardizing proposal for Electrical Projects of small hydroelectric central and it has as objective to optimize some solutions for the most cases, considering the great diversity of options. The development of the dissertation is the result of several real cases of projects of hydroelectric centrals. Besides the projects, several bibliographies about the case which is being studied were researched, taking into consideration the entire proposal presented to the respective authors and, finally, as synthesis to all observations made in that study, the presentation of an optimized solution for the job of the electrical components and a proposal for the estimate of costs of those components. The conclusions of this work present a favorable result because they offer an initial proposal for the standardizing of information considered extremely important for the carrying out of a project of hydroelectric central. (author)

  14. The hydroelectric power plant as a project of private investment; La central hidroelectrica como proyecto de inversion privada

    Energy Technology Data Exchange (ETDEWEB)

    Guerra, Eduardo [Industrias Metalurgicas Pescarmona S.A. (IMPSA), Mendoza (Argentina)]. E-mail: guerra@impsa.com.ar

    2001-07-01

    The paper describes the process to be followed for the performance, construction and operation of a hydroelectric investment from the view point of a private investor. The paper demonstrates that it is possible to finance the project through the 'project finance', where the finance has as guarantee the own assets and the fund fluxes of the investment.

  15. Dynamic simulation and optimization approach to construction diversion of hydraulic and hydroelectric projects

    Institute of Scientific and Technical Information of China (English)

    ZHONG DengHua; LI MingChao; HUANG Wei; LIU Yong

    2009-01-01

    To solve the engineering and scientific problems in construction diversion and its simulation analysis,a complete scheme is presented. Firstly, the complex constraint relationship was analyzed among main buildings, diversion buildings and flow control. Secondly, the time-space relationship model of construction diversion system and the general block diagram-oriented simulation model of diversion process were set up. Then, the corresponding numerical simulation method and 3D dynamic visual simulation method were put forward. Further, the simulation and optimization platform of construction diversion control process was developed, integrated with simulation modeling, computation and visualization. Finally, these methods were applied to a practical project successfully, showing that the modeling process is convenient, the computation and the visual analysis can be coupled effectively,and the results conform to practical state. They provide new theoretical principles and technical measures for analyzing the control problems encountered in construction diversion of hydraulic and hydroelectric engineering under complex conditions.

  16. Dynamic simulation and optimization approach to construction diversion of hydraulic and hydroelectric projects

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    To solve the engineering and scientific problems in construction diversion and its simulation analysis, a complete scheme is presented. Firstly, the complex constraint relationship was analyzed among main buildings, diversion buildings and flow control. Secondly, the time-space relationship model of construction diversion system and the general block diagram-oriented simulation model of diversion process were set up. Then, the corresponding numerical simulation method and 3D dynamic visual simulation method were put forward. Further, the simulation and optimization platform of construction diversion control process was developed, integrated with simulation modeling, computation and visualization. Finally, these methods were applied to a practical project successfully, showing that the modeling process is convenient, the computation and the visual analysis can be coupled effectively, and the results conform to practical state. They provide new theoretical principles and technical measures for analyzing the control problems encountered in construction diversion of hydraulic and hydroelectric engineering under complex conditions.

  17. Socio-economic and Environmental Implications of the Hydroelectric Projects in Uttarakhand Himalaya, India

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    This paper deals with detailed analysis of the fiasco created by the Tehri High Dam in Uttarakhand, India, particularly in terms of resettlement and rehabilitation of the local inhabitants. Aspects pertaining to the environmental issues are also discussed. Currently, the river valleys in Uttarakhand state of India are the targets of increasing hydroelectric projects. Virtually all rivers are being exploited for generating environmental friendly power. Having being learned the hard lesson from Tehri Dam, it has been decided to opt for suchschemes in which comparatively little submergenceand tempering with the fragile eco-systems is involved.However, our observations suggest that even in such schemes if due care is not taken they may turn out to be a failure.

  18. Status Review of Wildlife Mitigation at Columbia Basin Hydroelectric Projects, Oregon Facilities, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bedrossian, Karen L.

    1984-08-01

    The report presents a review and documentation of existing information on wildlife resources at Columbia River Basin hydroelectric facilities within Oregon. Effects of hydroelectric development and operation; existing agreements; and past, current and proposed wildlife mitigation, enhancement, and protection activities were considered. (ACR)

  19. Status Review of Wildlife Mitigation at 14 of 27 Major Hydroelectric Projects in Idaho, 1983-1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Martin, Robert C.; Mehrhoff, L.A.

    1985-01-01

    The Pacific Northwest Electric Power Planning and Conservation Act and wildlife and their habitats in the Columbia River Basin and to compliance with the Program, the wildlife mitigation status reports coordination with resource agencies and Indian Tribes. developed the Columbia River Basin Fish and Wildlife Program development, operation, and maintenance of hydroelectric projects on existing agreements; and past, current, and proposed wildlife factual review and documentation of existing information on wildlife meet the requirements of Measure 1004(b)(l) of the Program. The mitigation, enhancement, and protection activities were considered. In mitigate for the losses to those resources resulting from the purpose of these wildlife mitigation status reports is to provide a resources at some of the Columbia River Basin hydroelectric projects the river and its tributaries. To accomplish this goal, the Council were written with the cooperation of project operators, and in within Idaho.

  20. Lake Robertson hydroelectric project. Construction of a roller compacted concrete dam

    Energy Technology Data Exchange (ETDEWEB)

    Labelle, M.; Robitaille, F. [Hydro-Quebec, Montreal, PQ (Canada)

    1995-12-31

    Construction of the Lake Robertson hydroelectric project on Quebec`s Lower North Shore was discussed in detail. The dam and powerhouse, located on the HaHa River, consists of a 134 m long concrete gravity dam, and a 21 MW powerhouse with two 69 kV transmission lines and four substations. The climate, terrain, and geography of the region, all of them characterized as severe, and the logistics of construction of the dam and power lines, aggravated by the isolation and severe conditions at the site, were described. The roller compacted concrete design and construction were noted, and justification for a concrete dam over an earth-fill dam was provided. Economics, properties, and composition of the roller compacted concrete (RCC) were examined, and control test results for the RCC concrete were provided. The use of RCC for the Lake Robertson development was described as successful in terms of the quality, watertightness, and completion time. The experience gained by the participants will make it possible to offer RCC as an alternative on various other projects. 2 figs.

  1. Impact of hydroelectric projects on river environment: Analysis of water quality changes in Ningxia Reach of Yellow River

    Directory of Open Access Journals (Sweden)

    Sun Dongpo

    2008-06-01

    Full Text Available In this paper, the relationship between hydroelectric projects and the river environment is analyzed. Recently, the large-scale regulation of runoff by large hydroelectric projects in the Ningxia Reach of the Yellow River has altered natural runoff processes, causing an increase in the probability of low discharge and an overall adjustment of riverbed evolution and river characteristics. During low-flow years, the combined effects of these two changes can weaken the self-purification capacity and reduce the water environmental capacity of the river. This is one of the main reasons for the recent decrease of water quality in the Ningxia Reach. This research shows that it is necessary to implement river training projects to maintain stable flow paths, not only for adjusting river regimes and for flood control, but also for increasing the self-purification capacity and the water environmental capacity of the river. Methods and proposals for coordinating the operation of hydroelectric projects with the protection of the river environment are presented in the interest of promoting sustainable development.

  2. Impact of hydroelectric projects on river environment: Analysis of water quality changes in Ningxia Reach of Yellow River

    Institute of Scientific and Technical Information of China (English)

    Sun Dongpo; Lu Ruili; Song Yongjun; Yan Jun

    2008-01-01

    In this paper, the relationship between hydroelectric projects and the river environment is analyzed. Recently, the large-scale regulation of runoff by large hydroelectric projects in the Ningxia Reach of the Yellow River has altered natural runoff processes, causing an increase in the probability of low discharge and an overall adjustment of riverbed evolution and river characteristics. During low-flow years, the combined effects of these two changes can weaken the self-purification capacity and reduce the water environmental capacity of the river. This is one of the main reasons for the recent decrease of water quality in the Ningxia Reach. This research shows that it is necessary to implement river training projects to maintain stable flow paths, not only for adjusting river regimes and for flood control, but also for increasing the self-purification capacity and the water environmental capacity of the river. Methods and proposals for coordinating the operation of hydroelectric projects with the protection of the river environment are presented in the interest of promoting sustainable development.

  3. Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System

    Energy Technology Data Exchange (ETDEWEB)

    Stephens, Jessica D.

    2013-05-29

    On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project – Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the City’s hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the City’s Project Engineer, who had overseen the application, resigned and left the City’s employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently

  4. Effects of Hydroelectric Dam Operations on the Restoration Potential of Snake River Fall Chinook Salmon (Oncorhynchus tshawytscha) Spawning Habitat Final Report, October 2005 - September 2007.

    Energy Technology Data Exchange (ETDEWEB)

    Hanrahan, Timothy P.; Richmond, Marshall C.; Arntzen, Evan V. [Pacific Northwest National Laboratory

    2007-11-13

    This report describes research conducted by the Pacific Northwest National Laboratory for the Bonneville Power Administration (BPA) as part of the Fish and Wildlife Program directed by the Northwest Power and Conservation Council. The study evaluated the restoration potential of Snake River fall Chinook salmon spawning habitat within the impounded lower Snake River. The objective of the research was to determine if hydroelectric dam operations could be modified, within existing system constraints (e.g., minimum to normal pool levels; without partial removal of a dam structure), to increase the amount of available fall Chinook salmon spawning habitat in the lower Snake River. Empirical and modeled physical habitat data were used to compare potential fall Chinook salmon spawning habitat in the Snake River, under current and modified dam operations, with the analogous physical characteristics of an existing fall Chinook salmon spawning area in the Columbia River. The two Snake River study areas included the Ice Harbor Dam tailrace downstream to the Highway 12 bridge and the Lower Granite Dam tailrace downstream approximately 12 river kilometers. These areas represent tailwater habitat (i.e., riverine segments extending from a dam downstream to the backwater influence from the next dam downstream). We used a reference site, indicative of current fall Chinook salmon spawning areas in tailwater habitat, against which to compare the physical characteristics of each study site. The reference site for tailwater habitats was the section extending downstream from the Wanapum Dam tailrace on the Columbia River. Fall Chinook salmon spawning habitat use data, including water depth, velocity, substrate size and channelbed slope, from the Wanapum reference area were used to define spawning habitat suitability based on these variables. Fall Chinook salmon spawning habitat suitability of the Snake River study areas was estimated by applying the Wanapum reference reach habitat

  5. The wildlife research & rescue programme for mammals at Hulu Terengganu Hydroelectric Project (HTHEP), Terengganu, Peninsular Malaysia

    Science.gov (United States)

    Nur-Syuhada, N.; Magintan, D.; Siti-Hajar, A. R.; Aisah, M. S.; Shukor, M. N.

    2016-11-01

    During the inundation of the Hulu Terengganu Hydroelectric Project in October 2014, a wildlife rescue programme was conducted to rescue animals found trapped within the expanding 61.6 km2 reservoir. A total of 244 mammals from 30 species, representing 12 families were rescued by various methods included baited live trapping, catchpoles, hoop nets and by hand. The order Rodentia recorded the highest amount of rescued individuals at 20.9%, followed by Primate (18.9), Dermoptera (11.1), Carnivora (0.8) and Pholidota (0.4). The genus Rattus recorded the highest individuals rescued (51 individuals) probably due to the rapid clear-cut logging of the forest prior to inundation. Notable mammals of high conservational value rescued included Manis javanicus (Pangolin), Presbytis melalophos siamensis (Mitred Leaf Monkey), Trachypithecus obscurus (Dusky Leaf Monkey), Hylobates lar (White Handed Gibbon), Nycticebus coucang (Slow Loris), Galeopterus variegatus (Sunda Colugo), Callosciurus nigrovittatus (Sunda Black-banded Squirrel), Ratufa spp. (Giant Squirrels), and Sundasciurus hippurus (Horse-tailed Squirrel). Various data and biological samples were collected from the mammals rescued prior to their release at the nearest forest reserves. Rescue operation enabled the inventory and comprehensive data collection of various arboreal and rare mammal species that are hard to capture using the traditional survey method.

  6. Fish passage mitigation of impacts from hydroelectric power projects in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Cada, G.F. [Oak Ridge National Lab., TN (United States). Environmental Sciences Div.

    1996-10-01

    Obstruction of fish movements by dams continues to be the major environmental issue facing the hydropower industry in the US. Dams block upstream migrations, which can cut off adult fish form their historical spawning grounds and severely curtail reproduction. Conversely, downstream-migrating fish may be entrained into the turbine intake flow and suffer turbine-passage injury or mortality. Hydroelectric projects can interfere with the migrations of a wide variety of fish. Maintenance, restoration or enhancement of populations of these species may require the construction of facilities to allow for upstream and downstream fish passage. The Federal Energy Regulatory Commission (FERC), by law, must give fish and wildlife resources equal consideration with power production in its licensing decisions, must be satisfied that a project is consistent with comprehensive plans for a waterway (including fisheries management plans), and must consider all federal and state resource agency terms and conditions for the protection of fish and wildlife. As a consequence, FERC often requires fish passage mitigation measures as a condition of the hydropower license when such measures are deemed necessary for the protection of fish. Much of the recent research and development efforts of the US Department of Energy`s Hydropower Program have focused on the mitigation of impacts to upstream and downstream fish passage. This paper descries three components of that effort: (1) a survey of environmental mitigation measures at hydropower sites across the country; (2) a critical review of the effectiveness of fish passage mitigation measures at 16 case study sites; and (3) ongoing efforts to develop new turbine designs that minimize turbine-passage mortality.

  7. 75 FR 28595 - City of Idaho Falls; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2010-05-21

    ... Energy Regulatory Commission City of Idaho Falls; Notice of Application for Amendment of License and..., 2010, March 31, 2010. d. Applicant: City of Idaho Falls. e. Name of Project: Idaho Falls Hydroelectric Project. f. Location: The proposed non-project use is in Idaho Falls, Idaho. g. Filed Pursuant to:...

  8. 77 FR 55206 - Freedom Falls, LLC; Notice of Application Accepted for Filing, Intent To Waive Scoping, and...

    Science.gov (United States)

    2012-09-07

    ... Energy Regulatory Commission Freedom Falls, LLC; Notice of Application Accepted for Filing, Intent To...: Freedom Falls, LLC. e. Name of Project: Freedom Falls Hydroelectric Project. f. Location: On Sandy Stream.... Applicant Contact: Anthony P. Grassi, Freedom Falls, LLC, 363 Belfast Road, Camden, ME 04843, (207)...

  9. 3D integrated modeling approach to geo-engineering objects of hydraulic and hydroelectric projects

    Institute of Scientific and Technical Information of China (English)

    ZHONG DengHua; LI MingChao; LIU Jie

    2007-01-01

    Aiming at 3D modeling and analyzing problems of hydraulic and hydroelectric engineering geology, a complete scheme of solution is presented. The first basis was NURBS-TIN-BRep hybrid data structure. Then, according to the classified thought of the object-oriented technique, the different 3D models of geological and engineering objects were realized based on the data structure, including terrain class,strata class, fault class, and limit class; and the modeling mechanism was alternative. Finally, the 3D integrated model was established by Boolean operations between 3D geological objects and engineering objects. On the basis of the 3D model,a series of applied analysis techniques of hydraulic and hydroelectric engineering geology were illustrated. They include the visual modeling of rock-mass quality classification, the arbitrary slicing analysis of the 3D model, the geological analysis of the dam, and underground engineering. They provide powerful theoretical principles and technical measures for analyzing the geological problems encountered in hydraulic and hydroelectric engineering under complex geological conditions.

  10. 3D integrated modeling approach to geo-engineering objects of hydraulic and hydroelectric projects

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    Aiming at 3D modeling and analyzing problems of hydraulic and hydroelectric en-gineering geology,a complete scheme of solution is presented. The first basis was NURBS-TIN-BRep hybrid data structure. Then,according to the classified thought of the object-oriented technique,the different 3D models of geological and engi-neering objects were realized based on the data structure,including terrain class,strata class,fault class,and limit class;and the modeling mechanism was alterna-tive. Finally,the 3D integrated model was established by Boolean operations be-tween 3D geological objects and engineering objects. On the basis of the 3D model,a series of applied analysis techniques of hydraulic and hydroelectric engineering geology were illustrated. They include the visual modeling of rock-mass quality classification,the arbitrary slicing analysis of the 3D model,the geological analysis of the dam,and underground engineering. They provide powerful theoretical prin-ciples and technical measures for analyzing the geological problems encountered in hydraulic and hydroelectric engineering under complex geological conditions.

  11. The influence of changes in lifestyle and mercury exposure in riverine populations of the Madeira River (Amazon Basin) near a hydroelectric project.

    Science.gov (United States)

    Hacon, Sandra S; Dórea, José G; Fonseca, Márlon de F; Oliveira, Beatriz A; Mourão, Dennys S; Ruiz, Claudia M V; Gonçalves, Rodrigo A; Mariani, Carolina F; Bastos, Wanderley R

    2014-02-26

    In the Amazon Basin, naturally occurring methylmercury bioaccumulates in fish, which is a key source of protein consumed by riverine populations. The hydroelectric power-plant project at Santo Antônio Falls allows us to compare the Hg exposure of riverine populations sparsely distributed on both sides of the Madeira river before the area is to be flooded. From 2009 to 2011, we concluded a population survey of the area (N = 2,008; representing circa 80% of community residents) that estimated fish consumption and mercury exposure of riverine populations with different degrees of lifestyle related to fish consumption. Fish samples from the Madeira river (N = 1,615) and 110 species were analyzed for Hg. Hair-Hg was significantly lower (p < 0.001) in less isolated communities near to the capital of Porto Velho (median 2.32 ppm) than in subsistence communities in the Cuniã Lake, 180 km from Porto Velho city (median 6.3 ppm). Fish Hg concentrations ranged from 0.01 to 6.06 µg/g, depending on fish size and feeding behavior. Currently available fish in the Madeira river show a wide variability in Hg concentrations. Despite cultural similarities, riparians showed hair-Hg distribution patterns that reflect changes in fish-eating habits driven by subsistence characteristics.

  12. The Influence of Changes in Lifestyle and Mercury Exposure in Riverine Populations of the Madeira River (Amazon Basin near a Hydroelectric Project

    Directory of Open Access Journals (Sweden)

    Sandra S. Hacon

    2014-02-01

    Full Text Available In the Amazon Basin, naturally occurring methylmercury bioaccumulates in fish, which is a key source of protein consumed by riverine populations. The hydroelectric power-plant project at Santo Antônio Falls allows us to compare the Hg exposure of riverine populations sparsely distributed on both sides of the Madeira river before the area is to be flooded. From 2009 to 2011, we concluded a population survey of the area (N = 2,008; representing circa 80% of community residents that estimated fish consumption and mercury exposure of riverine populations with different degrees of lifestyle related to fish consumption. Fish samples from the Madeira river (N = 1,615 and 110 species were analyzed for Hg. Hair-Hg was significantly lower (p < 0.001 in less isolated communities near to the capital of Porto Velho (median 2.32 ppm than in subsistence communities in the Cuniã Lake, 180 km from Porto Velho city (median 6.3 ppm. Fish Hg concentrations ranged from 0.01 to 6.06 µg/g, depending on fish size and feeding behavior. Currently available fish in the Madeira river show a wide variability in Hg concentrations. Despite cultural similarities, riparians showed hair-Hg distribution patterns that reflect changes in fish-eating habits driven by subsistence characteristics.

  13. Fall 2016 Solicitation Projects Website Info

    Energy Technology Data Exchange (ETDEWEB)

    Diachin, L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-03-30

    Spark-ignition engines are the backbone behind people transportation around the world. The efficiency of spark-ignition engines is limited in practice by variations between engine cycles and cylinders within an engine that result from the manufacturing processes/tolerances. These variations impact knock limits and dilution tolerance, which results in more conservative settings for design and calibration settings, such as compression ratio, valve timing, and exhaust gas recirculation rates. Engine variations also have a significant impact on emissions generation, which can have a secondary impact on efficiency. A deeper understanding of the relative importance of these variations and their interactions on the charge preparation process can guide future decisions on machining tolerances and control strategies. This project will develop simulation tools and methodology to include the effects of some key manufacturing tolerances and their impact on engine performance and emissions.

  14. Risk factors for the presence of Aedes aegypti and Aedes albopictus in domestic water-holding containers in areas impacted by the Nam Theun 2 hydroelectric project, Laos

    NARCIS (Netherlands)

    Hiscox, A.F.; Kaye, A.; Vongphayloth, K.; Banks, I.; Piffer, M.; Khammanithong, P.; Sananikhom, P.; Kaul, S.; Hill, N.; Lindsay, S.W.; Brey, P.T.

    2013-01-01

    We assessed risk factors for vectors of dengue and chikungunya viruses near a new hydroelectric project, Nam Theun 2, in Laos. Immature stages of Aedes aegypti were found only in sites within 40 km of the urban provincial capital, but Aedes albopictus was found throughout. Aedes aegypti pupae were m

  15. Risk factors for the presence of Aedes aegypti and Aedes albopictus in domestic water-holding containers in areas impacted by the Nam Theun 2 hydroelectric project, Laos

    NARCIS (Netherlands)

    Hiscox, A.F.; Kaye, A.; Vongphayloth, K.; Banks, I.; Piffer, M.; Khammanithong, P.; Sananikhom, P.; Kaul, S.; Hill, N.; Lindsay, S.W.; Brey, P.T.

    2013-01-01

    We assessed risk factors for vectors of dengue and chikungunya viruses near a new hydroelectric project, Nam Theun 2, in Laos. Immature stages of Aedes aegypti were found only in sites within 40 km of the urban provincial capital, but Aedes albopictus was found throughout. Aedes aegypti pupae were

  16. Risk factors for the presence of Aedes aegypti and Aedes albopictus in domestic water-holding containers in areas impacted by the Nam Theun 2 hydroelectric project, Laos

    NARCIS (Netherlands)

    Hiscox, A.F.; Kaye, A.; Vongphayloth, K.; Banks, I.; Piffer, M.; Khammanithong, P.; Sananikhom, P.; Kaul, S.; Hill, N.; Lindsay, S.W.; Brey, P.T.

    2013-01-01

    We assessed risk factors for vectors of dengue and chikungunya viruses near a new hydroelectric project, Nam Theun 2, in Laos. Immature stages of Aedes aegypti were found only in sites within 40 km of the urban provincial capital, but Aedes albopictus was found throughout. Aedes aegypti pupae were m

  17. Feasibility determination of low head hydroelectric power development at existing sites: Mousam River Project

    Energy Technology Data Exchange (ETDEWEB)

    1979-06-01

    The technical and economic feasibility of low head hydroelectric power development at existing sites along the Mousam River in southeastern Maine was studied. The following areas were investigated: determination of available energy; development of restoration concepts; environmental studies; historical and archeological studies; assessment of civil construction requirements; geotechnical and geologic assessment of existing dams; assessment of turbine alternatives; assessment of generator and utility interface alternatives; economic analysis; and restoration concept evaluation and selection. The results of the hydropower evaluation showed that: of the seven sites evaluated, only four can be considered economically feasible for refurbishment at this time; the use of used and/or rebuilt equipment is more economically attractive than new equipment; the cost of equipment at each site was of the same order as the cost of the dam reconstruction; and the cost of fuel prices will be the determining feature of whether the sites should be reconstructed.

  18. South Fork Tolt River Hydroelectric Project : Adopted Portions of a 1987 Federal Energy Regulatory Commission`s Final Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-07-01

    The South Fork Tolt River Hydroelectric Project that world produce 6.55 average megawatts of firm energy per year and would be sited in the Snohomish River Basin, Washington, was evaluated by the Federal Energy Regulatory commission (FERC) along with six other proposed projects for environmental effects and economic feasibility Based on its economic analysis and environmental evaluation of the project, the FERC staff found that the South Fork Tolt River Project would be economically feasible and would result in insignificant Impacts if sedimentation issues could be resolved. Upon review, the BPA is adopting portions of the 1987 FERC FEIS that concern the South Fork Tolt River Hydroelectric Project and updating specific sections in an Attachment.

  19. Niagara Falls HEW 309 Project 1974-1975: Evaluation Report.

    Science.gov (United States)

    Skeen, Elois M.

    The document reports an outside evaluation of a Niagara Falls Adult Basic Education Program special project entitled "Identification of Preferred Cognitive Styles and Matching Adult Reading Program Alternatives for the 0-4 Grade Levels." It was concerned with (1) research, training in cognitive style mapping, and development of a survey…

  20. Private sector financing of projects - implementation of the BAKUN hydroelectric project in Malaysia; Private Projektfinanzierung - Errichtung der Wasserkraftanlage Bakun in Malaysia

    Energy Technology Data Exchange (ETDEWEB)

    Failer, E. [Lahmeyer International GmbH, Frankfurt am Main (Germany)

    1998-07-01

    The BAKUN Hydroelectric Power Project in Malaysia represents, alongside the Three Gorges Project in China, one of today's most closely observed hydropower projects. The Bakun Project features a generating capacity of 2 520 MW, a 205 m high concrete face rockfill dam and a 1 320 km long power transmission system from Sarawak (Borneo) to West Malaysia. Implementation costs are estimated at around DM 10 000 million. In December 1996 the concession to construct and operate the Bakun Project for a period of 30 years on a BOT (build-operate-transfer) basis was granted to the Bakun Hydro-Electric Corporation, a private project development company. A US-Dollar million contract was awarded one year prior to this concession, to construct the river diversion works in advance. Completion of the three concrete-lined diversion tunnels, each with an inner diameter of 12 m, is scheduled for the end of 1998. After a brief overview of the Bakun Project, the paper describes a typical structure of the parties involved and the legal framework for BOT project finance. The most important features of the concession agreement, the power purchase agreement (PPA) and the engineering, procurement and construction (EPC) contract are explained. Finally, the paper emphasizes that in future the water resources engineer will have to be more involved with topics such as fixed-price contracts, risk management, turnkey solutions and project finance. (orig.) [German] Mit einer geplanten installierten Leistung von 2 520 MW, einem 205 m hohen Steinschuettdamm mit Betonoberflaechendichtung, einem 1 320 km langen Energieuebertragungssystem von Sarawak (Borneo) nach Westmalaysia und mit Projektkosten von ca. 10 Mrd. DM stellt das BAKUN-Wasserprojekt in Malaysia, neben dem Dreischluchtenprojekt in China, eines der meist beachteten Wasserkraftprojekte der Gegenwart dar. Im Dezember 1996 erhielt die private Projektentwicklungsgesellschaft 'Bakun Hydro-Electric Corporation' die Konzession, das

  1. Sediment management of run-of-river hydroelectric power project in the Himalayan region using hydraulic model studies

    Indian Academy of Sciences (India)

    NEENA ISAAC; T I ELDHO

    2017-07-01

    Storage capacity of hydropower reservoirs is lost due to sediment deposition. The problem is severe in projects located on rivers with high sediment concentration during the flood season. Removing the sediment deposition hydraulically by drawdown flushing is one of the most effective methods for restoring the storagecapacity. Effectiveness of the flushing depends on various factors, as most of them are site specific. Physical/mathematical models can be effectively used to simulate the flushing operation, and based on the results of the simulation, the layout design and operation schedule of such projects can be modified for better sediment management. This paper presents the drawdown flushing studies of the reservoir of a Himalayan River Hydroelectric Project called Kotlibhel in Uttarakhand, India. For the hydraulic model studies, a 1:100 scale geometrically similar model was constructed. Simulation studies in the model indicated that drawdown flushing for duration of 12 h with a discharge of 500 m3/s or more is effective in removing the annual sediment deposition in the reservoir. The model studies show that the sedimentation problem of the reservoir can be effectively managed through hydraulic flushing.

  2. Safety Assessment of High-Risk Operations in Hydroelectric-Project Based on Accidents Analysis, SEM, and ANP

    Directory of Open Access Journals (Sweden)

    Jian-Lan Zhou

    2013-01-01

    Full Text Available Safety risk analysis and assessment of high-risk work system in hydroelectric project has an important role in safety management. The interactive relationships between human factors and the importance of factors are analyzed and proposed. We analyze the correlation relationship among the factors by using statistical method, which is more objective than subjective judgment. The HFACS is provided to establish a rational and an applicable index system for investigating human error in accidents; the structural equation modeling (SEM and accident data are used to construct system model and acquire the path coefficient among the risk factor variables; the ANP model is built to assess the importance of accident factors. 289 pieces of valid questionnaires data are analyzed to obtain the path coefficient between risk factor variables and to build the ANP model’s judgment matrix. Finally, the human factors’ weights are calculated by ANP model. Combining SEM’s results and factor's frequency analysis and building the ANP model, the results show that the four greatest weight values of the factors are, respectively, “personal readiness,” “perception and decision errors,” “skill-based errors,” and “violation operations.” The results of ANP model provide a reference for the engineering and construction management.

  3. Carbon stored in forest plantations of Pinus caribaea, Cupressus lusitanica and Eucalyptus deglupta in Cachí Hydroelectric Project

    Directory of Open Access Journals (Sweden)

    Marylin Rojas

    2014-06-01

    Full Text Available Forest plantations are considered the main carbon sinks thought to reduce the impact of climate change. Regarding many species, however, there is a lack of information in order to establish metrics on accumulation of biomass and carbon, principally due to the level of difficulty and the cost of quantification through direct measurement and destructive sampling. In this research, it was evaluated carbon stocks of forest plantations near the dam of hydroelectric project Cachí, which belongs to Instituto Costarricense de Electricidad. 25 unit samples were evaluated along some plantations that contain three different species. 30 Pinus caribacea trees, 14 Cupressus lusitanica and 15 Eucalyptus deglupta were extracted. The biomass was quantified by means of the destructive method. First of all, every component of the tree was weighed separately; then, sampling was obtained in order to determine the dry matter and the carbon fraction. 110 biomass samples from the three species were analyzed in laboratory, including all the components (leaves, branches, shaft, and root. The carbon fraction varied between 47,5 and 48,0 for Pinus caribacea; between 32,6 and 52,7 for Cupressus lusitanica, and beween 36,4 and 50,3% for Eucalyptus deglupta. The stored carbon was 230, 123, and 69 Mg ha-1 in plantations of P. caribaea, C. lusitanica and E. deglupta, respectively. Approximately, 75% of the stored carbon was detected in the shaft.

  4. Economic Evaluation of Small Hydroelectric Generation Project which aims to both Global Warming Adaptation and Regional Economic Revitalization

    OpenAIRE

    Ohno, Eiji; Mori, Ryuta; Morisugi, Masafumi; Sao, Hiroshi

    2014-01-01

    Based on the international agreements after the Kyoto Protocol, some projects to reduce the greenhouse gas emission have been promoted even in Japan. Therefore, policies such as various regulations and introduction of the environmental tax have been discussed, so people will be asked for big burden. However, in many local cities, problems such as falling birth rate, aging, and stagnation of regional economy are important subjects, so it is hard to give the priority to the global warming preve...

  5. Oregon Trust Agreement Planning Project : Potential Mitigations to the Impacts on Oregon Wildlife Resources Associated with Relevant Mainstem Columbia River and Willamette River Hydroelectric Projects.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-10-01

    A coalition of the Oregon wildlife agencies and tribes (the Oregon Wildlife Mitigation Coalition) have forged a cooperative effort to promote wildlife mitigation from losses to Oregon wildlife resources associated with the four mainstream Columbia River and the eight Willamette River Basin hydroelectric projects. This coalition formed a Joint Advisory Committee, made up of technical representatives from all of the tribes and agencies, to develop this report. The goal was to create a list of potential mitigation opportunities by priority, and to attempt to determine the costs of mitigating the wildlife losses. The information and analysis was completed for all projects in Oregon, but was gathered separately for the Lower Columbia and Willamette Basin projects. The coalition developed a procedure to gather information on potential mitigation projects and opportunities. All tribes, agencies and interested parties were contacted in an attempt to evaluate all proposed or potential mitigation. A database was developed and minimum criteria were established for opportunities to be considered. These criteria included the location of the mitigation site within a defined area, as well as other criteria established by the Northwest Power Planning Council. Costs were established for general habitats within the mitigation area, based on estimates from certified appraisers. An analysis of the cost effectiveness of various types of mitigation projects was completed. Estimates of operation and maintenance costs were also developed. The report outlines strategies for gathering mitigation potentials, evaluating them, determining their costs, and attempting to move towards their implementation.

  6. 75 FR 30852 - Hydroelectric Power Development at Ridgway Dam, Dallas Creek Project, Colorado

    Science.gov (United States)

    2010-06-02

    ... the United States for the use of a Government facility. Depending on the economic capability of the... similar projects, industry rating(s) that indicate financial soundness and/or technical and managerial... be included. Identify proposed methods of financing the hydropower development. An economic...

  7. Water quality in hydroelectric projects: considerations for planning in tropical forest regions. Technical paper

    Energy Technology Data Exchange (ETDEWEB)

    Garzon, C.E.

    1984-01-01

    This paper identifies and describes the studies necessary to predict water-quality changes, at an early state of planning, in large tropical reservoirs with long retention times. Emphasis is placed on both the reservoir area and the region downstream. The need for defining the baseline environment is presented as a requirement for conducting studies associated with the flooding and operating stages. These studies are classified according to the stage of project development. In the reservoir area, aspects such as biomass quantification, reservoir thermal stratification, water circulation, dissolved oxygen consumption, and reservoir recovery are of major importance. Downstream from the project, the stress is placed on river recovery capacity, water uses and conflicts, and flow requirements.

  8. Planning of a small hydroelectric installation project - orientation aids; Vom Plan zum Werk - Orientierungshilfen

    Energy Technology Data Exchange (ETDEWEB)

    Hutarew, A. [Dr. Hutarew und Partner, Pforzheim (Germany)

    1997-12-31

    The article informs in concise form on essential elements of the plannning of a small hydro power project. Understanding and considerateness are demanded from all parties concerned when such a joint project is envisaged. Not one-sided interests should be followed; rather, everyone should contribute towards facilitating renewable energy generation. Some negative examples are cited. (orig.) [Deutsch] In der Kuerze der gebotenen Zeit wurde versucht, wesentliche Eckpfeiler in der Entstehung einer Wasserkraftanlage zu skizzieren. Ziel meiner Ausfuehrungen ist es, von allen Beteiligten Verstaendnis abzuverlangen und Ruecksichtnahme zu praktizieren, geht es doch darum, ein gemeinsames Werk entstehen zu lassen. Wir stehen nicht in der Not, einseitige Interessen zu verfechten, sondern gemeinsam an einem Baustein regenerativer Energieerzeugung zu arbeiten. Es sei mir verziehen, wenn durch die Schilderung von Negativ-Beispielen ein eher unueblicher Weg beschritten wurde. (orig.)

  9. Final Project Report, Bristol Bay Native Corporation Wind and Hydroelectric Feasibility Study

    Energy Technology Data Exchange (ETDEWEB)

    Vaught, Douglas J.

    2007-03-31

    The Bristol Bay Native Corporation (BBNC) grant project focused on conducting nine wind resource studies in eight communities in the Bristol Bay region of southwest Alaska and was administered as a collaborative effort between BBNC, the Alaska Energy Authority, Alaska Village Electric Cooperative, Nushagak Electric Cooperative (NEC), Naknek Electric Association (NEA), and several individual village utilities in the region. BBNC’s technical contact and the project manager for this study was Douglas Vaught, P.E., of V3 Energy, LLC, in Eagle River, Alaska. The Bristol Bay region of Alaska is comprised of 29 communities ranging in size from the hub community of Dillingham with a population of approximately 3,000 people, to a few Native Alaska villages that have a few tens of residents. Communities chosen for inclusion in this project were Dillingham, Naknek, Togiak, New Stuyahok, Kokhanok, Perryville, Clark’s Point, and Koliganek. Selection criteria for conduction of wind resource assessments in these communities included population and commercial activity, utility interest, predicted Class 3 or better wind resource, absence of other sources of renewable energy, and geographical coverage of the region. Beginning with the first meteorological tower installation in October 2003, wind resource studies were completed at all sites with at least one year, and as much as two and a half years, of data. In general, the study results are very promising for wind power development in the region with Class 6 winds measured in Kokhanok; Class 4 winds in New Stuyahok, Clark’s Point, and Koliganek; Class 3 winds in Dillingham, Naknek, and Togiak; and Class 2 winds in Perryville. Measured annual average wind speeds and wind power densities at the 30 meter level varied from a high of 7.87 meters per second and 702 watts per square meter in Kokhanok (Class 6 winds), to a low of 4.60 meters per second and 185 watts per square meter in Perryville (Class 2 winds).

  10. Albeni Falls Wildlife Mitigation Project, 2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Soults, Scott [Kootenai Tribe of Idaho

    2009-08-05

    The Albeni Falls Interagency Work Group (AFIWG) was actively involved in implementing wildlife mitigation activities in late 2007, but due to internal conflicts, the AFIWG members has fractionated into a smaller group. Implementation of the monitoring and evaluation program continued across protected lands. As of 2008, The Albeni Falls Interagency Work Group (Work Group) is a coalition comprised of wildlife managers from three tribal entities (Kalispel Tribe, Kootenai Tribe, Coeur d Alene Tribe) and the US Army Corps of Engineers. The Work Group directs where wildlife mitigation implementation occurs in the Kootenai, Pend Oreille and Coeur d Alene subbasins. The Work Group is unique in the Columbia Basin. The Columbia Basin Fish and Wildlife Authority (CBFWA) wildlife managers in 1995, approved what was one of the first two project proposals to implement mitigation on a programmatic basis. The maintenance of this kind of approach through time has allowed the Work Group to implement an effective and responsive habitat protection program by reducing administrative costs associated with site-specific project proposals. The core mitigation entities maintain approximately 9,335 acres of wetland/riparian habitats in 2008.

  11. Normanskill Hydroelectric Facility Feasibility Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Besha, J.A.

    1979-01-01

    A study was conducted to determine the feasibility of installing a hydroelectric generating facility at an existing dam of the Normanskill Reservoir in NY. Evaluation of the hydrologic, technical, economic, legal, instrumental and environmental factors led to the conclusion that the project is feasible and advantageous. The proposed project has a present worth net cost of $3,099,800. The benefit cost ratio is 2.36. It is estimated that the proposed hydroelectric generating facility at the French's Mills site, City of Watervliet Reservoir will replace approximately 6,000 barrels of foreign oil per year. (LCL)

  12. Case Study and Numerical Analysis of Vibration and Runner Cracks for the Lipno I Hydroelectric Project

    Science.gov (United States)

    Zouhar, J.; Obrovsky, J.; Feilhauer, M.; Skotak, A.

    2016-11-01

    The refurbishment of the Lipno I TG2 Francis turbine, situated on River Vltava, with maximum net head of 165 m and required operational range from 0 to 67MW of turbine power was performed in 2014. The new hydraulic design of the spiral case, distributor and runner was developed for this project. After about 1000 hours of operation the site inspection was performed and the cracks were found on 8 runner blades of 17 blades altogether. The all cracks were found near runner hub beginning from the trailing edge. The dimensions of the cracks were different with maximum length of 123 mm and minimum length of 3 mm. The runner was repaired and the intensive investigation was started to define the main cause of the cracks creation and to determine the measures for their elimination. This paper presents the program of this investigation which consists of static and dynamic blade strain measurement, CFD and FEM analysis, discusses the crack causes and overview the solution how to return the turbine successfully to operation.

  13. Application of finance project for leverage of small size hydroelectric enterprising; Aplicacao do project finance para alavancagem de empreendimentos hidreletricos de pequeno porte

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Silvana dos

    2003-07-01

    In the same way that the majority of the countries, project financing of substructure in Brazil, in project finance modality, depend on a skillful structure of guaranties and contracts to become possible. In the case of projects of centrals of generation of electrical energy, that financial engineering becomes still more complicated. In Brazil, due to particularities of the sectors of electricity, the arrangements of guaranties requested but creditors pass to present levels of complexity and exigency well elevated. The contractual appliances that give support to the project finance, originally projected to developed countries, request an extreme adaptation to these particularities. The development of Brazil is directly related to its capacity in expanding the offer of electric energy in the just measure of the national necessity. In this context, the small central hydroelectric (PCH's) represent, actually, an efficient and fast form to complete the offer of energy in such a way to supply the crescent demand the national market. For its characteristics, that type of undertaking can be developed by small manager, from among which are the owners of the areas in which on can find these hydraulic potentials which, however they do not dispose of capital to integral raising. These undertakings are tasks, normally, of low global cost, at the rate of US$ 1.000,00/k W, and of a smaller ambient impact, compared to the return that they give to the enterprise and to the Brazilian electric system as a whole, by having to receive special attention in the planned politics to the sector and to merit a series of incentives to become business still more attractive. By thinking in the found difficulty by small enterprises in rising undertakings of generation of electric energy of small port through the convectional mechanisms of financing is being proposed in that work a well-founded methodology in the concepts of the modality of financing project finance. (author)

  14. Small-scale hydroelectric power plant: project finance and case study; PCH - project finance e estudo de caso

    Energy Technology Data Exchange (ETDEWEB)

    Alencar Filho, Francisco; Castilho, Wagner Francisco [GACER Consultoria, Brasilia, DF (Brazil)

    2008-10-15

    This work brings a study on the optimum allocation of resources - theory of finance - and also on the optics of operations structured project finance. Regarding project finance is presented concepts, structure, characteristics, steps for the identification and allocation of risks and structure of guarantees. In the sequence sets up with the necessary level of detail key aspects of the case study, for preparation and analysis of the project case study from PCH Flores Formosas Hipotetica S/A - a simulation of case study. (author)

  15. Wildlife Loss Estimates and Summary of Previous Mitigation Related to Hydroelectric Projects in Montana, Volume Three, Hungry Horse Project.

    Energy Technology Data Exchange (ETDEWEB)

    Casey, Daniel

    1984-10-01

    This assessment addresses the impacts to the wildlife populations and wildlife habitats due to the Hungry Horse Dam project on the South Fork of the Flathead River and previous mitigation of theses losses. In order to develop and focus mitigation efforts, it was first necessary to estimate wildlife and wildlife hatitat losses attributable to the construction and operation of the project. The purpose of this report was to document the best available information concerning the degree of impacts to target wildlife species. Indirect benefits to wildlife species not listed will be identified during the development of alternative mitigation measures. Wildlife species incurring positive impacts attributable to the project were identified.

  16. Assessment of Diversity, Distribution, Conservation Status and Preparation of Management Plan for Medicinal Plants in the Catchment Area of Parbati Hydroelectric Project Stage -Ⅲ in Northwestern Himalaya

    Institute of Scientific and Technical Information of China (English)

    S.S. Samant; Jitendra S. Butola; Aman Sharma

    2007-01-01

    The developmental activities, particularly the construction of hydroelectric projects are causing a great loss of biodiversity in the Indian Himalayan Region. The Himachal Pradesh, a part of IHR is well known for the development of hydroelectric projects.The Parbati H.E. Project is amongst the major projects of the State. The different stages of the project are all causing loss of biodiversity of the area.Stage Ⅲ of the Parbati H.E. Project is a run of the river scheme on the Sainj River downstream of Power House of Parbati H.E. Project Stage Ⅱ. The project shall utilize regulated discharge of Parbati H.E.Project Stage Ⅱ and inflow of River Sainj for power generation, and has been contemplated as a peaking station operating in tandem with Stage Ⅱ. The present study has been undertaken to see the impact of hydroelectric project on the biodiversity, particularly on medicinal plants. A total of 104 species of medicinal plants, belonging to different life forms, i.e.,trees (23 spp.), shrubs (22 spp.), herbs (57 spp.) and ferns (2 spp.) were recorded. The species have been analyzed and studied for their distribution,classification, altitudinal zones, part (s) used,indigenous uses, nativity, endemism and rarity.Different parts of these species, such as whole plants,roots (including rhizomes and tubers), leaves, flowers,fruits, seeds, stems, barks, spikes, nuts and insect galls are used by the inhabitants for curing various diseases and ailments. 30 species are native to the Himalayan region, 9 species native to the Himalayan region and adjacent countries also and 65 species are non-natives. 9 species are near endemics. Considering the whole Himalaya as a biogeographic unit (sensu lato),the near endemics are endemic to the Himalaya.Among these species, Zanthoxylum armatum is categorized as Endangered and Valeriana wallichii as Vulnerable. Hedychium spicatum, Rhus javanica,Berberis lycium, Thalictrum foliolossum, Salvia lanata, Rubia cordifolia and Bergenia

  17. 78 FR 19477 - Freedom Falls, LLC; Notice of Availability of Environmental Assessment

    Science.gov (United States)

    2013-04-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Freedom Falls, LLC; Notice of Availability of Environmental Assessment In... application for exemption from licensing for the Freedom Falls Hydroelectric Project, to be located on...

  18. A critical analysis of the environment impact assessment report of the 2000 MW lower subansiri hydroelectric project with special reference to the down stream ecology and people's livelihood.

    Science.gov (United States)

    Baruah, Debojit; Dutta, Ranjit; Hazarika, Lakhi Prasad; Sarmah, Sarada Kanta

    2011-10-01

    The Environment Impact Assessment (EIA) report of the 2000 MW Lower Subansiri Hydroelectric Project prepared by the WAPCOS (Water and Power Consultancy Service, 2003) indicates that downstream survey was done only up to 7 km from the dam site without giving much importance to the actual scenario and avoiding some most crucial ecological aspects. In the report, insufficient records of terrestrial flora, phytoplanktons and fish diversity are given. No records of aquatic macrophytes, riparian flora, zooplanktons, avian fauna, floodplain crops, besides peoples' livelihood and diverse habitat provided by the river in its downstream are presented in the report. Especially the wetlands, associated and influenced by the unregulated Subansiri River did not find any place in the EIA report. Interestingly, no mention of the Ganges Dolphin--Platanista gangetica gangetica Roxb. could be found in the report, whereas the river provides a healthy habitat for a good number of this critically endangered fresh water dolphin. From our pre-impact study, it is clear that rich downstream ecology of the river with its present and existing environmental scenario will be adversely affected due to the construction and operation of the proposed project, and there will be distinct possibilities of elimination of other native species. In addition, people's livelihood will be affected largely through alteration of the flow regime of the river. In-depth study with comprehensive documentation of all biotic and abiotic parameters is obligatory before taking any decision about the operation of the 2000 MW Lower Subansiri Hydroelectric Project.

  19. Summary : Cooperative whooping crane tracking project : Fall 1975 to spring 1989

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Summary of the whooping crane tracking project for fall 1975 to spring 1989. The Project involves the following activities: (a) distribution of Pre­Migration Notices...

  20. Formative evaluation of the telecare fall prevention project for older veterans

    Directory of Open Access Journals (Sweden)

    Saliba Debra

    2011-05-01

    Full Text Available Abstract Background Fall prevention interventions for community-dwelling older adults have been found to reduce falls in some research studies. However, wider implementation of fall prevention activities in routine care has yielded mixed results. We implemented a theory-driven program to improve care for falls at our Veterans Affairs healthcare facility. The first project arising from this program used a nurse advice telephone line to identify patients' risk factors for falls and to triage patients to appropriate services. Here we report the formative evaluation of this project. Methods To evaluate the intervention we: 1 interviewed patient and employee stakeholders, 2 reviewed participating patients' electronic health record data and 3 abstracted information from meeting minutes. We describe the implementation process, including whether the project was implemented according to plan; identify barriers and facilitators to implementation; and assess the incremental benefit to the quality of health care for fall prevention received by patients in the project. We also estimate the cost of developing the pilot project. Results The project underwent multiple changes over its life span, including the addition of an option to mail patients educational materials about falls. During the project's lifespan, 113 patients were considered for inclusion and 35 participated. Patient and employee interviews suggested support for the project, but revealed that transportation to medical care was a major barrier in following up on fall risks identified by nurse telephone triage. Medical record review showed that the project enhanced usual medical care with respect to home safety counseling. We discontinued the program after 18 months due to staffing limitations and competing priorities. We estimated a cost of $9194 for meeting time to develop the project. Conclusions The project appeared feasible at its outset but could not be sustained past the first cycle of

  1. Formative evaluation of the telecare fall prevention project for older veterans.

    Science.gov (United States)

    Miake-Lye, Isomi M; Amulis, Angel; Saliba, Debra; Shekelle, Paul G; Volkman, Linda K; Ganz, David A

    2011-05-23

    Fall prevention interventions for community-dwelling older adults have been found to reduce falls in some research studies. However, wider implementation of fall prevention activities in routine care has yielded mixed results. We implemented a theory-driven program to improve care for falls at our Veterans Affairs healthcare facility. The first project arising from this program used a nurse advice telephone line to identify patients' risk factors for falls and to triage patients to appropriate services. Here we report the formative evaluation of this project. To evaluate the intervention we: 1) interviewed patient and employee stakeholders, 2) reviewed participating patients' electronic health record data and 3) abstracted information from meeting minutes. We describe the implementation process, including whether the project was implemented according to plan; identify barriers and facilitators to implementation; and assess the incremental benefit to the quality of health care for fall prevention received by patients in the project. We also estimate the cost of developing the pilot project. The project underwent multiple changes over its life span, including the addition of an option to mail patients educational materials about falls. During the project's lifespan, 113 patients were considered for inclusion and 35 participated. Patient and employee interviews suggested support for the project, but revealed that transportation to medical care was a major barrier in following up on fall risks identified by nurse telephone triage. Medical record review showed that the project enhanced usual medical care with respect to home safety counseling. We discontinued the program after 18 months due to staffing limitations and competing priorities. We estimated a cost of $9194 for meeting time to develop the project. The project appeared feasible at its outset but could not be sustained past the first cycle of evaluation due to insufficient resources and a waning of local

  2. Electric generator overhaul of the Ing. Carlos Ramirez Ulloa hydroelectric. Central project conclusions; Rehabilitacion de los generadores de la central hidroelectrica Ing. Carlos Ramirez Ulloa. Conclusiones del proyecto

    Energy Technology Data Exchange (ETDEWEB)

    Campuzano Martinez, Ignacio Roberto; Gonzalez Vazquez, Alejandro Esteban; Robles Pimentel, Edgar Guillermo; Esparza Saucedo, Marcos; Garcia Martinez, Javier; Sanchez Flores, Ernesto; Martinez Romero, Jose Luis [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1998-12-31

    The Hydroelectric Ing. Carlos Ramirez Ulloa Power Central has three 200 MW electric generators. The Central initiated its commercial operation in 1985. The electric generators had design problems that were properly corrected in an overhaul program that was initiated in 1996, with Unit 2 electric generator and completed in 1998 with Unit 1 electric generator. This paper presents the relevant aspects of the experience accumulated in the project. [Espanol] La central hidroelectrica Ing. Carlos Ramirez Ulloa cuenta con tres generadores de 200 MW cada uno. La central inicio su operacion comercial en 1985. Los generadores tenian problemas de diseno que fueron debidamente corregidos en un programa de rehabilitacion que inicio en 1996, con el generador de la unidad 2, y culmino en 1998 con el generador de la unidad 1. En este articulo se presentan los aspectos relevantes de la experiencia acumulada en el proyecto.

  3. Perceived ill-health and health seeking behavior in two communities in the nam theun 2 hydroelectric project area in Lao People's Democratic Republic

    Institute of Scientific and Technical Information of China (English)

    Sayasone S; Erlanger TE; Kaul S; Sananikhom P; Tanner M; Utzinger J; Odermatt P

    2009-01-01

    Objective:To compare perceived ill-health and health seeking behavior between two communities affected by the large Nam Theun 2 hydroelectric project in central Lao People's Democratic Republic (PDR).Methods:Two different affected areas:Nakai plateaubeing remote,sparcely populated and mountainous,and Xe Bang Fai lowland plains,more densely populated and comparatively affluent were included.Data were obtained from two cross-sectional household-based health and socio-economic surveys.Results:We found pronounced differ-ences in the frequency of self-reported fever,cough,headache and myalgia according to location.On the Na-kai plateau,45.1 % of the individuals with ill-health report (recall period:2 weeks)went to a local health volunteer compared to only 7.2 % in the Xe Bang Fai area (P <0.001).In Nakai,there were disproportion-ately more illiterates seeking help from local health volunteers when compared to those who attended at least primary schooling (49.2 % versus 17.5 %,P <0.01).Self-medication with antimalarials was more common in Xe Bang Fai than on Nakai (32.3 % versus 7.0 %,P <0.001).The mean amount of money spent per health consultation was US $1.7 in Nakai and US $7.2 in Xe Bang Fai.Conclusion:The observed differ-ences in self-reported ill-health and health seeking behavior among these two Lao communities need to be con-sidered when implementing setting-specific mitigation measures as part of the public health action plan of the Nam Theun 2 hydroelectric project.

  4. Effect of Niagara power project on ground-water flow in the upper part of the Lockport Dolomite, Niagara Falls area, New York

    Science.gov (United States)

    Miller, Todd S.; Kappel, W.M.

    1987-01-01

    The Niagara River Power Project near Niagara Falls, N.Y., has created recharge and discharge areas that have modified the direction of groundwater flow east and northeast of the falls. Before construction of the power project in 1962, the configuration of the potentiometric surface in the upper part of the Silurian Lockport Dolomite generally paralleled the buried upper surface of the bedrock. Ground water in the central and east parts of the city of Niagara Falls flowed south and southwestward toward the upper Niagara River (above the falls), and ground water in the western part flowed westward into Niagara River gorge. The power project consists of two hydroelectric powerplants separated by a forebay canal that receives water from the upper Niagara River through two 4-mi-long, parallel, buried conduits. During periods of nonpeak power demand, some water in the forebay canal is pumped to a storage reservoir for later release to generate electricity during peak-demand periods. Since the power project began operation in 1962, groundwater within 0.5 mi of the buried conduits has seeped into the drain system that surrounds the conduits, then flows both south from the forebay canal and north from the Niagara River toward the Falls Street tunnel--a former sewer that crosses the conduits 0.65 mi north of the upper Niagara River. Approximately 6 million gallons of ground water a day leaks into the Falls Street tunnel, which carries it 2.3 mi westward to the Niagara River gorge below the falls. Daily water-level fluctuations in the forebay canal affect water levels in the drain system that surrounds the conduits, and this , in turn, affects the potentiometric surface in the Lockport Dolomite within 0.5 mi of the conduits. The drains transmit changes in pressure head near the forebay canal southward at least as far as the Falls Street tunnel area and possibly to the upper Niagara River. Some water in the pumped-storage reservoir recharges ground water in the Lockport

  5. Fall 2014 SEI Research Review Insider Threat Mitigation LINE Project

    Science.gov (United States)

    2014-10-01

    Fall 2014 SEI Research Review Moore, 28-30 October 2014 © 2014 Carnegie Mellon University Contact Information Slide Format Presenter / Point of...published • Threat models published in book: CERT Guide to Insider Threats (2012) • Pattern-Based Design of Insider Threat Programs: Forthcoming 12

  6. Project final report: Energetic planning focusing small scale hydroelectric power plants; Relatorio final. Projeto planejamento energetico com enfase em pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Costa, Yara dos Santos

    1994-12-31

    Considering the increasing need for a better utilization of the Brazilian hydric resources, a deeper analysis of small scale hydroelectric power plants has been demanding. This work presents a case study of energetic planning based upon small scale hydroelectric power plants in a district of Amazon state - North Brazil 8 refs., 11 figs., 19 tabs.

  7. Small hydroelectric engineering practice

    CERN Document Server

    Leyland, Bryan

    2014-01-01

    Small Hydroelectric Engineering Practice is a comprehensive reference book covering all aspects of identifying, building, and operating hydroelectric schemes between 500 kW and 50 MW. In this range of outputs there are many options for all aspects of the scheme and it is very important that the best options are chosen.As small hydroelectric schemes are usually built against a limited budget it is extremely important that the concept design is optimum and every component is designed to maximise the benefi t and minimise the cost. As operating costs are often a high proportion of the income it i

  8. A guide to India's hydroelectric organisations

    Energy Technology Data Exchange (ETDEWEB)

    Sahai, I.M.

    1999-12-01

    A brief history of hydroelectric power in India is given. The ownership, role and future of India's National Hydroelectric Power Corporation (NHPC) is described. Tables of Hydro Power Potential in India and Installed Hydroelectric Capacity in India are given. Some major hydroelectric projects undertaken by federal-state joint ventures are described. Bearing in mind the enormous potential for further development of hydro, the federal-owned National Thermal Power Corporation (NTPC) has now moved into hydro, but to date it has had little impact. Overseas companies have also had little impact on hydro in India. Renovation of older hydro plant is likely to provide work opportunities for private companies.

  9. 78 FR 38028 - Duke Energy Progress, Inc.; Notice of Video Conference To Discuss Yadkin-Pee Dee Hydroelectric...

    Science.gov (United States)

    2013-06-25

    ... Dee Hydroelectric Project Biological Opinion On April 29, 2013, the National Marine Fisheries Service... relicensing of the Yadkin-Pee Dee River Hydroelectric Project No. P-2206. The document included NMFS'...

  10. The Rio Lajas hydroelectric project in Costa Rica; Hydro-Quebec International gained from its Quebec expertise; La centrale Rio Lajas, au Costa Rica; Hydro-Quebec International a mis a profit l`expertise quebecoise

    Energy Technology Data Exchange (ETDEWEB)

    Cordeau, P.

    1997-08-01

    The participation of Hydro-Quebec International in the construction and development of the Rio Lajas hydroelectric project in Costa Rica was described. The 10 MW Rio Lajas hydroelectric station in Costa Rica is expected to go into operation in September of 1998. The station is owned by the HRL consortium, which is composed of Hydro-Quebec International and Corporacion Superior. Construction of the station was contracted out to SEH Constructora SA, a company composed of the Costarican contractor Saret and two companies from Quebec; Entreprises Bon Conseil and Hydro-Mecanique. The station comprises two horizontal-axis Francis turbines. Turbines and alternators were respectively supplied by Bouvier and GEC Alsthom, two French manufacturers. Considerable attention was given to the control of the Rio Lajas river, whose discharge can vary by as much as 100 times in the steep volcanic terrains. Approximately 15 Hydro-Quebec employees were delegated to Costa Rica to oversee various stages of the project.

  11. The PARAChute Project: Remote Monitoring of Posture and Gait for Fall Prevention

    Directory of Open Access Journals (Sweden)

    Charpillet François

    2007-01-01

    Full Text Available Falls in the elderly are a major public health problem due to both their frequency and their medical and social consequences. In France alone, more than two million people aged over 65 years old fall each year, leading to more than 9 000 deaths, in particular in those over 75 years old (more than 8 000 deaths. This paper describes the PARAChute project, which aims to develop a methodology that will enable the detection of an increased risk of falling in community-dwelling elderly. The methods used for a remote noninvasive assessment for static and dynamic balance assessments and gait analysis are described. The final result of the project has been the development of an algorithm for movement detection during gait and a balance signature extracted from a force plate. A multicentre longitudinal evaluation of balance has commenced in order to validate the methodologies and technologies developed in the project.

  12. 33 CFR Appendix - List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects

    Science.gov (United States)

    2010-07-01

    ... ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE WORK FOR OTHERS Investigation and supervision of hydropower projects under the Federal Power Act (ER 1140-2-4). Pt. 221, List List of FPC Standard Articles...

  13. 76 FR 67171 - Solia 7 Hydroelectric LLC; Riverbank Hydro No. 20 LLC; Lock Hydro Friends Fund XLIII; FFP Project...

    Science.gov (United States)

    2011-10-31

    ...-long, 34.5 kilo-volt (kV) transmission line. The proposed project would have an average annual... the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing...

  14. Fall 2015 NASA Internship, and Space Radiation Health Project

    Science.gov (United States)

    Patience, Luke

    2015-01-01

    This fall, I was fortunate enough to have been able to participate in an internship at NASA's Lyndon B. Johnson Space Center. I was placed into the Human Health & Performance Directorate, where I was specifically tasked to work with Dr. Zarana Patel, researching the impacts of cosmic level radiation on human cells. Using different laboratory techniques, we were able to examine the cells to see if any damage had been done due to radiation exposure, and if so, how much damage was done. Cell culture samples were exposed at different doses, and fixed at different time points so that we could accumulate a large pool of quantifiable data. After examining quantifiable results relative to the impacts of space radiation on the human body at the cellular and chromosomal level, researchers can defer to different areas of the space program that have to do with astronaut safety, and research and development (extravehicular mobility unit construction, vehicle design and construction, etc.). This experience has been very eye-opening, and I was able to learn quite a bit. I learned some new laboratory techniques, and I did my best to try and learn new ways to balance such a hectic work and school schedule. I also learned some very intimate thing about working at NASA; I learned that far more people want to watch you succeed, rather than watch you fail, and I also learned that this is a place that is alive with innovators and explorers - people who have a sole purpose of exploring space for the betterment of humanity, and not for any other reason. It's truly inspiring. All of these experiences during my internship have impacted me in a really profound way, so much that my educational and career goals are completely different than when I started. I started out as a biotechnology major, and I discovered recently toward the end of the internship, that I don't want to work in a lab, nor was I as enthralled by biological life sciences as a believed myself to be. Taking that all into

  15. U. S. Trade and Development Program, Guayabo-Siquirres hydroelectric project, Costa Rica. Definitional-mission report. Export trade information

    Energy Technology Data Exchange (ETDEWEB)

    Boyd, E.L.

    1992-06-01

    The Guayabo-Siquirres project is on the Caribbean slopes of the cordillera, east of San Jose. It consists of two linked systems: Guayabo comprising a low dam and intake on the Rio Reventazon, a 10-km power tunnel, penstock and surface powerhouse which discharges into the Rio Pacuare upstream of the Siquirres reservoir, and Siquirres comprising a high dam, a 3-km power tunnel and surface powerhouse. A Definitional Mission was carried out. The objective was to evaluate the project, develop and cost out the scope of work for a feasibility study, estimate the potential exports of U.S. equipment and services during project implementation, and provide TDP with an overview of the current international competitiveness of the U.S.

  16. A Multi-objective Fuzzy Decision Method for Hydroelectric Power Project Investment%水电项目投资的多目标模糊决策方法

    Institute of Scientific and Technical Information of China (English)

    赖一飞; 纪昌明

    2001-01-01

    对水电项目投资方案多目标决策问题进行了研究.根据多目标模糊优化的基本原理,结合目标相对优属度概念,给出了多目标模糊决策中通过回归确定权重的方法,同时提出了基于权重回归组合的水电项目投资多目标决策模糊优化方法,通过实例验证了该模型的合理性和有效性%Problem of multi-objective decision for hydroelectric powerproject investment is proposed in this paper. On the basis of fundamental principle of multi-objective fuzzy optimization,this paper advanced a multi-objective fuzzy model to optimize hydroelectric power project investment schemes based on the regressive and composite method that analyses the objective importance.Numerical results show availability and effectiveness of multi-objective decision for hydroelectric power project investment by an example.

  17. Hydroelectricity production and forest conservation in watersheds.

    Science.gov (United States)

    Guo, Zhongwei; Li, Yiming; Xiao, Xiangming; Zhang, Lin; Gan, Yaling

    2007-09-01

    Globally, particularly in developing countries, hydroelectricity production and economic growth occur together with ecosystem/biodiversity conservation in watersheds. There is a relationship between hydroelectricity production and ecosystem/biodiversity conservation in watersheds, centering on the supply and demand for ecosystem services of river water flow regulation and sediment retention. Here we show that, in the upper reach of the Yangtze River, hydroelectricity production of Three Gorges Hydroelectric Power Plant can form a beneficial relationship with forest conservation through the paid use (compensating residents for their cooperation in the conservation) of ecosystem services launched by the National Natural Forest Protection Project. This interaction can provide additional incentives to encourage local communities' long-term cooperation in conserving and protecting the restored forest ecosystems. Hydroelectricity plants also obtain benefits from this interaction. The industrialization of ecosystem services supply provides an operational framework for this beneficial interaction. Sustainable forest ecosystem conservation will require developing new institutions and policies and must involve local communities in the conservation and protection of their local forests.

  18. The first cut-off wall in the Indian Himalayas for the dam of the Dhauliganga hydroelectric project

    Energy Technology Data Exchange (ETDEWEB)

    Brunner, W.G. [Bauer Maschinen GmbH, Berlin (Germany)

    2006-07-01

    This paper provided details a Bauer cutter used to build a cut-off wall for the Dhaulinganga power plant project in the Himalayan mountains. The dam for the project was built as a 56 m high concrete-faced rockfill dam with a length of 270 m at the crown. A cut-off wall was constructed on the upstream side of the dam extending down from the dam's plinth to the bedrock level. A Bauer cutter was used to key the cut-off wall straight into the bedrock, which omitted the need for a grout curtain. The cut-off wall is 1 m thick and 70 m deep, with a total area of 8000 m{sup 2}. The wall was constructed as a series of primary and secondary panels. Excavation of the panels was carried out in single bites by the Bauer DHG hydraulic diaphragm wall grabs, supported a box chisel, cross chisel and a Bauer BC 40 rock cutter. Trench stability was provided by bentonite slurry. The closing forces were activated by a cylinder which was installed vertically inside the base body. The Bauer cutter continuously removed soil and rock from the bottom of the trench for mixing with the bentonite slurry. The slurry was then pumped through a ring main of hose pipes to a desanding plant where it was cleaned and returned to the trench. Advantages offered by using the cutter included a consistently high output, an extremely high degree of verticality, watertight joints, and the ability to cut through hard boulders. Use of the cutter at the Dhaulinganga site showed that the project could not be carried out successfully without the use of the cutter, which was used whenever grab and chisel methods were unable to achieve satisfactory rates of penetration. Deployment of the cutter was essential to key the cut-off wall into the underlying bedrock. It was concluded that the Dhualinganga project will provide a model for future power generation projects in the Indian Himalayas. 11 figs.

  19. Evaluation of Acoustic Doppler Current Profiler to Measure Discharge at New York Power Authority's Niagara Power Project, Niagara Falls, New York

    Science.gov (United States)

    Zajd, Henry J.

    2007-01-01

    The need for accurate real-time discharge in the International Niagara River hydro power system requires reliable, accurate and reproducible data. The U.S. Geological Survey has been widely using Acoustic Doppler Current Profilers (ADCP) to accurately measure discharge in riverine channels since the mid-1990s. The use of the ADCP to measure discharge has remained largely untested at hydroelectric-generation facilities such as the New York Power Authority's (NYPA) Niagara Power Project in Niagara Falls, N.Y. This facility has a large, engineered diversion channel with the capacity of high volume discharges in excess of 100,000 cubic feet per second (ft3/s). Facilities such as this could benefit from the use of an ADCP, if the ADCP discharge measurements prove to be more time effective and accurate than those obtained from the flow-calculation techniques that are currently used. Measurements of diversion flow by an ADCP in the 'Pant Leg' diversion channel at the Niagara Power Project were made on November 6, 7, and 8, 2006, and compared favorably (within 1 percent) with those obtained concurrently by a conventional Price-AA current-meter measurement during one of the ADCP measurement sessions. The mean discharge recorded during each 2-hour individual ADCP measurement session compared favorably with (3.5 to 6.8 percent greater than) the discharge values computed by the flow-calculation method presently in use by NYPA. The use of ADCP technology to measure discharge could ultimately permit increased power-generation efficiency at the NYPA Niagara Falls Power Project by providing improved predictions of the amount of water (and thus the power output) available.

  20. Environmental Assessment: Addressing Construction Projects at Niagara Falls Air Reserve Station, New York

    Science.gov (United States)

    2011-07-01

    dust collectors, abrasive blasting units, and woodworking equipment. Other stationary sources at Niagara Falls ARS include paint booths, degreasers...property. In accordance with OSHA regulations, personnel accessing the EOD Range would wear hearing protection when the range is active, which would...EA Addressing Construction Projects emissions from architectural coatings and asphalt paving operations . Emissions of all criteria pollutants would

  1. The impact of hydroelectric project development on the ethnobotany of the Alaknanda river basin of Western Himalaya, India

    Directory of Open Access Journals (Sweden)

    Khilendra Singh Kanwal

    2015-12-01

    Full Text Available Background: This study focuses on the ethnoflora used by local communities in the Alaknanda river basin of Uttarakhand state in Western Himalaya, India. The objectives of the study are to collect ethnobotanical information, to assess the impact of hydropower projects on ethnoflora and to suggest conservation and management measures for the protection of ethnoflora. Material and Methods: A well-designed questionnaire based survey was conducted in the ten villages of the study area to collect ethnobotanical information. The conservation status of plants was also evaluated following the IUCN Red list, the Red Data Book of Indian Plants and the CITES criteria. Results: A total of 136 plant species belonging to 61 families and 112 genera were used by local communities for various ethnobotanical purposes. The majority of plant species were used for medicinal purposes (96 spp., followed by fodder (46 spp., wild edibles (31 spp., fuel (29 spp., timber (17 spp., fish poison (9 spp., agriculture implements (6 spp., fibre (6 spp., religious use (6 spp. and handicraft (1 sp.. For the preparation of herbal medicine, rural people of the region use different parts of medicinal plants such as the whole plant (20% followed by roots/rhizomes/tubers (20%, leaf (18%, fruit (10%, seed (9%, bark (9%, stem (6%, flowers (6% and resin (2%. Conclusions: Development of hydropower projects will influence the diversity and distribution of ethnoflora in the region. Therefore, for the conservation of the ethnoflora of the area, conservation and management measures have been suggested.

  2. Social and political implications of great hydroelectric projects on the native and country population; Implicacoes politicas e sociais de grandes projetos hidroeletricos sobre as populacoes indigenas e camponesas

    Energy Technology Data Exchange (ETDEWEB)

    Sigaud, Lygia [Rio de Janeiro Univ., RJ (Brazil). Museu Nacional

    1993-03-01

    The power generation policy adopted in Brazil for the construction of large hydroelectric power plants and its social impacts are analysed. It is stressed the importance of the participation of the society in the definition of this policy. This can be achieved now with the re democratization of the country and a more active participation of the people in the future of the nation.

  3. Site observational work plan for the UMTRA Project site at Falls City, Texas

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    Produced by the US Department of Energy (DOE), this site observational work plan (SOWP) will be used to determine site-specific activities to comply with the US Environmental Protection Agency (EPA) ground water standards at this Uranium Mill Tailings Remedial Action (UMTRA) Project site. The purpose of the SOWP is to recommend a site-specific ground water compliance strategy at the Falls City UMTRA Project site. The Falls City SOWP presents a comprehensive summary of site hydrogeological data, delineates a conceptual model of the aquifer system, and discusses the origins of milling-related ground water contamination. It also defines the magnitude of ground water contamination, potential environmental and health risks associated with ground water contamination and data gaps, and targets a proposed compliance strategy.

  4. UMTRA project water sampling and analysis plan, Falls City, Texas. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Falls City, Texas, are described in this water sampling and analysis plan (WSAP). The following plan identifies and justifies the sampling locations, analytical parameters, and sampling frequency for the routine monitoring stations at the site. The ground water data are used for site characterization and risk assessment. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US Environmental Protection Agency (EPA) regulations in 40 CFR Part 192. Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site. The Falls City site is in Karnes County, Texas, approximately 8 miles [13 kilometers southwest of the town of Falls City and 46 mi (74 km) southeast of San Antonio, Texas. Before surface remedial action, the tailings site consisted of two parcels. Parcel A consisted of the mill site, one mill building, five tailings piles, and one tailings pond south of Farm-to-Market (FM) Road 1344 and west of FM 791. A sixth tailings pile designated Parcel B was north of FM 791 and east of FM 1344.

  5. SEDIMENT MANAGEMENT IN HYDROELECTRIC PROJECTS

    Institute of Scientific and Technical Information of China (English)

    K.G.RANGA RAJU; U.C.KOTHYARI

    2005-01-01

    Withdrawal of water from a river into a canal involves the construction of a barrage or a dam across the river depending on whether the river is perennial or not. The design of the reservoir upstream of the dam and of the canal requires consideration of the sediment load carried by the river in case the river is sediment-laden. The basic equations concerning morphological changes in such rivers are discussed with particular reference to computation of reservoir sedimentation. The hydraulics of lined canals carrying wash load is examined from the point of view of limiting transport capacity and changes in frictional resistance. Lastly,the methods of design of sediment extraction devices like settling basins and vortex chambers are presented.

  6. Project to construct a hydroelectric complex on the Romaine River : public inquiry report; Projet d'amenagement d'un complexe hydroelectrique sur la riviere Romaine : rapport d'enquete et d'audience publique

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-02-15

    Hydro-Quebec is proposing to build a 1,550 MW hydroelectric complex on the Romaine River, north of Havre-Saint-Pierre, Quebec. The complex would comprise a rockfill dam, a spillway, and a power plant with two generating units. The proposed development is subject to an environmental evaluation process and public consultation. Quebec's environmental public hearing board held a public hearing on the draft development of the project to hear the concerns and views of the public and stakeholders. The hearing focused on a number issues, such as reasons for the project, its location and socio-economic impacts. The cumulative environmental effects of the project were also examined. However, electric transmission lines to connect the hydroelectric project network constitute a separate environmental assessment. In its analysis, the public hearing board found that the project meets 3 objectives of Quebec's energy strategy, notably to strengthen the security of energy supply, use more energy as lever for economic development, and give more power to local communities and First Nations regarding energy development. The Board suggested that given that 4 reservoirs will be created, mitigative measures are required to protect forest birds, waterfowl, salmon and their habitat. The project will likely create many local jobs and the need for additional commercial and social services. This stimulation will provide economic opportunities in municipalities and First Nation communities. The Board concluded that the project is not likely to cause significant adverse environmental effects. However, this conclusion is conditional on the implementation of mitigation measures, compensation and monitoring provided by the developer. 24 refs., 13 tabs., 11 figs.

  7. Regional policy and hydroelectric resources

    Directory of Open Access Journals (Sweden)

    Franco Romerio

    2009-06-01

    Full Text Available This article brings to light the different models applied in the management of hydroelectric resources in the Swiss canton Ticino during the 20th century. Future prospects are broached in view of the opening of the electricity markets to competition. We equally analyse political projects, notably regarding matters of water cantonalisation, as well as the technico-economic factors which influence them. Conflicts, that have been particularly acute, are evoked, and socio-economic, energy and environmental issues detailed. The national and international context is pointed out. The study allows the identification of critical factors that must be considered in the definition of regional policies in relation to hydroelectric matters.Cet article met en lumière les différents modèles de gestion des ressources hydroélectriques adoptés dans le canton du Tessin au XXe siècle. Les perspectives d’avenir sont esquissées en vue des processus d’ouverture des marchés à la concurrence. On analyse aussi bien les projets politiques, notamment en matière de cantonalisation des eaux, que les problèmes technico-économiques qui les ont influencés. Les conflits, qui ont été particulièrement aigus, sont évoqués, et les enjeux socio-économiques, énergétiques et environnementaux précisés. Le contexte national et international est rappelé tout au long de l’analyse. Cette étude permet d’identifier les facteurs critiques qu’il faut prendre en considération dans la définition des politiques régionales en matière hydroélectrique.

  8. Wildlife Impact Assessment and Summary of Previous Mitigation Related to Hydroelectric Projects in Montana, Volume One, Libby Dam Project, Operator, U.S. Army Corps of Engineers.

    Energy Technology Data Exchange (ETDEWEB)

    Yde, Chris A.

    1984-10-01

    This assessment addresses the impacts to the wildlife populations and wildlife habitats due to the Libby Dam project on the Kootenai River and previous mitigation of these losses. The current assessment documents the best available information concerning the impacts to the wildlife populations inhabiting the project area prior to construction of the dam and creation of the reservoir. Many of the impacts reported in this assessment differ from those contained in the earlier document compiled by the Fish and Wildlife Service; however, this document is a thorough compilation of the available data (habitat and wildlife) and, though conservative, attempts to realistically assess the impacts related to the Libby Dam project. Where appropriate the impacts resulting from highway construction and railroad relocation were included in the assessment. This was consistent with the previous assessments.

  9. 76 FR 18214 - Idaho Power; Notice of Availability of Land Management Plan Update for the Shoshone Falls Project...

    Science.gov (United States)

    2011-04-01

    ... a Land Management Plan (LMP) update for the project. The LMP is a comprehensive plan to manage... Shoshone Falls Project and Soliciting Comments, Motions To Intervene, and Protests Take notice that the... inspection: a. Application Type: Land Management Plan Update. b. Project No.: 2055-087. c. Date Filed...

  10. 76 FR 18213 - Idaho Power; Notice of Availability of Land Management Plan Update for the Shoshone Falls Project...

    Science.gov (United States)

    2011-04-01

    ... a Land Management Plan (LMP) update for the project. The LMP is a comprehensive plan to manage... Shoshone Falls Project and Soliciting Comments, Motions To Intervene, and Protests Take notice that the... inspection: a. Application Type: Land Management Plan Update. b. Project No.: 2778-062. c. Date Filed...

  11. Joint Venture Modes of Water Conservancy and Hydroelectric Engineering

    OpenAIRE

    Zhiding Chen; Zhudi Sheng

    2013-01-01

    With the long construction period, the giant scope and complex technology, water conservancy and hydroelectric engineering construction has large investment. In the fully competitive water conservancy and hydropower project construction contracting market, it is almost impossible for a company to contract with a water conservancy and hydropower project independently. Therefore, water conservancy and hydropower project construction can be contracted by several construction companie...

  12. Fall Chinook Acclimation Project; Pittsburg Landing, Captain John Rapids, and Big Canyon, Annual Report 2003.

    Energy Technology Data Exchange (ETDEWEB)

    McLeod, Bruce

    2004-01-01

    Fisheries co-managers of U.S. v Oregon supported and directed the construction and operation of acclimation and release facilities for Snake River fall Chinook from Lyons Ferry Hatchery at three sites above Lower Granite Dam. In 1996, Congress instructed the U.S. Army Corps of Engineers (USCOE) to construct, under the Lower Snake River Compensation Plan (LSRCP), final rearing and acclimation facilities for fall Chinook in the Snake River basin to complement their activities and efforts in compensating for fish lost due to construction of the lower Snake River dams. The Nez Perce Tribe (NPT) played a key role in securing funding and selecting acclimation sites, then assumed responsibility for operation and maintenance of the facilities. In 1997, Bonneville Power Administrative (BPA) was directed to fund operations and maintenance (O&M) for the facilities. Two acclimation facilities, Captain John Rapids and Pittsburg Landing, were located on the Snake River between Asotin, WA and Hells Canyon Dam and one facility, Big Canyon, was located on the Clearwater River at Peck. The Capt. John Rapids facility is a single pond while the Pittsburg Landing and Big Canyon sites consist of portable fish rearing tanks assembled and disassembled each year. Acclimation of 450,000 yearling smolts (150,000 each facility) begins in March and ends 6 weeks later. When available, an additional 2,400,000 fall Chinook sub-yearlings may be acclimated for 6 weeks, following the smolt release. The project goal is to increase the naturally spawning population of Snake River fall Chinook salmon upstream of Lower Granite Dam. This is a supplementation project; in that hatchery produced fish are acclimated and released into the natural spawning habitat for the purpose of returning a greater number of spawners to increase natural production. Only Snake River stock is used and production of juveniles occurs at Lyons Ferry Hatchery. This is a long-term project, targeted to work towards achieving

  13. 77 FR 2970 - Gibson Dam Hydroelectric Company, LLC, Montana; Notice of Availability of Final Environmental...

    Science.gov (United States)

    2012-01-20

    ... Energy Regulatory Commission Gibson Dam Hydroelectric Company, LLC, Montana; Notice of Availability of... 47897), the Office of Energy Projects has reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S. Department of the Interior, Bureau of Reclamation's Gibson dam on...

  14. 75 FR 30805 - Gibson Dam Hydroelectric Company, LLC; Notice Soliciting Comments, and Final Terms and Conditions...

    Science.gov (United States)

    2010-06-02

    ... Energy Regulatory Commission Gibson Dam Hydroelectric Company, LLC; Notice Soliciting Comments, and Final... Commission and is available for public inspection. a. Type of Application: Major Project--Existing Dam. b. Project No.: P-12478-003. c. Date filed: August 28, 2009. d. Applicant: Gibson Dam Hydroelectric...

  15. 76 FR 26718 - Gibson Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment

    Science.gov (United States)

    2011-05-09

    ... Energy Regulatory Commission Gibson Dam Hydroelectric Company, LLC; Notice of Availability of Draft... Energy Projects has reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S. Department of the Interior, Bureau of Reclamation's, Gibson dam on the Sun River...

  16. Wildlife Impact Assessment and Summary of Previous Mitigation Related to Hydroelectric Projects in Montana, Phase 1, Volume Two (B), Clark Fork River Projects, Cabinet Gorge and Noxon Rapids Dams, Operator, Washington Water Power Company.

    Energy Technology Data Exchange (ETDEWEB)

    Wood, Marilyn

    1984-06-01

    This report documents best available information concerning the wildlife species impacted and the degree of the impact. A target species list was developed to focus the impact assessment and to direct mitigation efforts. Many non-target species also incurred impacts but are not discussed in this report. All wildlife habitats inundated by the two reservoirs are represented by the target species. It was assumed the numerous non-target species also affected will be benefited by the mitigation measures adopted for the target species. Impacts addressed are limited to those directly attributable to the loss of habitat and displacement of wildlife populations due to the construction and operation of the two hydroelectric projects. Secondary impacts, such as the relocation of railroads and highways, and the increase of the human population, were not considered. In some cases, both positive and negative impacts were assessed; and the overall net effect was reported. The loss/gain estimates reported represent impacts considered to have occurred during one point in time except where otherwise noted. When possible, quantitative estimates were developed based on historical information from the area or on data from similar areas. Qualitative loss estimates of low, moderate, or high with supporting rationale were assessed for each species or species group.

  17. Assessing fish predation on migrating juvenile steelhead and a retrospective comparison to steelhead survival through the Priest Rapids Hydroelectric Project, Columbia River, Washington, 2009-11

    Science.gov (United States)

    Hardiman, Jill M.; Counihan, Timothy D.; Burgess, Dave S.; Simmons, Katrina E.; Holmberg, Glen S.; Rogala, Josh; Polacek, Rochelle

    2012-01-01

    The U.S. Geological Survey (USGS) and the Washington Department of Fish and Wildlife (WDFW) have been working with the Public Utility District No. 2 of Grant County, Washington (Grant PUD), to increase their understanding of predator-prey interactions in the Priest Rapids Hydroelectric Project (PRP), Columbia River, Washington. For this study, the PRP is defined as the area approximately 6 kilometers upstream of Wanapum Dam to the Priest Rapids Dam tailrace, 397.1 miles from the mouth of the Columbia River. Past year’s low survival numbers of juvenile steelhead (Oncorhynchus mykiss) through Wanapum and Priest Rapids Dams has prompted Grant PUD, on behalf of the Priest Rapids Coordinating Committee, to focus research efforts on steelhead migration and potential causal mechanisms for low survival. Steelhead passage survival in 2009 was estimated at 0.944 through the Wanapum Development (dam and reservoir) and 0.881 through the Priest Rapids Development and for 2010, steelhead survival was 0.855 for Wanapum Development and 0.904 for Priest Rapids Development. The USGS and WDFW implemented field collection efforts in 2011 for northern pikeminnow (Ptychocheilus oregonensis), smallmouth bass (Micropterus dolomieu), and walleye (Sander vitreus, formerly Stizostedion vitreum) and their diets in the PRP. For predator indexing, we collected 948 northern pikeminnow, 237 smallmouth bass, 18 walleye, and two largemouth bass (Micropterus salmoides). The intent of this study was to provide standardized predation indices within individual reaches of the PRP to discern spatial variability in predation patterns. Furthermore, the results of the 2011 study were compared to results of a concurrent steelhead survival study. Our results do not indicate excessively high predation of Oncorhynchus spp. occurring by northern pikeminnow or smallmouth bass in any particular reach throughout the study area. Although we found Oncorhynchus spp. in the predator diets, the relative

  18. Underground pumped hydroelectric storage

    Science.gov (United States)

    Allen, R. D.; Doherty, T. J.; Kannberg, L. D.

    1984-07-01

    Underground pumped hydroelectric energy storage was conceived as a modification of surface pumped storage to eliminate dependence upon fortuitous topography, provide higher hydraulic heads, and reduce environmental concerns. A UPHS plant offers substantial savings in investment cost over coal-fired cycling plants and savings in system production costs over gas turbines. Potential location near load centers lowers transmission costs and line losses. Environmental impact is less than that for a coal-fired cycling plant. The inherent benefits include those of all pumped storage (i.e., rapid load response, emergency capacity, improvement in efficiency as pumps improve, and capacity for voltage regulation). A UPHS plant would be powered by either a coal-fired or nuclear baseload plant. The economic capacity of a UPHS plant would be in the range of 1000 to 3000 MW. This storage level is compatible with the load-velocity requirements of a greater metropolitan area with population of 1 million or more.

  19. Reading landscape patrimony in the cities of Piranhas-AL and Caninde do Sao Francisco-SE: project tendencies direct influence area of the Xingo hydroelectric power plant; Leitura do patrimonio paisagistico nas cidades de Piranhas-AL e Caninde do Sao Francisco-SE: tendencias projetuais em area de influencia direta da UHE Xingo

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Alvaro Antonio Moreira da; Emerenciano, Pedro Tarcisio Costa [Companhia Hidroeletrica do Sao Francisco (CHESF), Recife, PE (Brazil)

    1995-12-31

    This study intends to analyse and diagnose the urban environment making a forecast of the project tendencies and vocation of the cities on its dynamic aspects involving the population and the environment. It searches for an interpretation of the elements that compose the natural landscape and the generated landscape, after the implementation of the Xingo hydroelectric power plant 4 refs., 4 figs.

  20. 77 FR 59609 - FPP Project 111, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2012-09-28

    ...) of the Federal Power Act (FPA), proposing to study the feasibility of the Lorella Pumped Storage Hydroelectric Project to be located near the town of Klamath Falls, Klamath County, Oregon. The project would... storage capacity of 14,300 acre-feet at a water surface area of 5,523 feet above mean sea level (msl); (2...

  1. Fall Chinook Acclimation Project; Pittsburg Landing, Captain John Rapids, and Big Canyon, Annual Report 2002.

    Energy Technology Data Exchange (ETDEWEB)

    McLeod, Bruce

    2003-01-01

    Fisheries co-managers of U.S. v Oregon supported and directed the construction and operation of acclimation and release facilities for Snake River fall Chinook from Lyons Ferry Hatchery at three sites above Lower Granite Dam. In 1996, Congress instructed the U.S. Army Corps of Engineers (USCOE) to construct, under the Lower Snake River Compensation Plan (LSRCP), final rearing and acclimation facilities for fall Chinook in the Snake River basin to complement their activities and efforts in compensating for fish lost due to construction of the lower Snake River dams. The Nez Perce Tribe (NPT) played a key role in securing funding and selecting acclimation sites, then assumed responsibility for operation and maintenance of the facilities. In 1997, Bonneville Power Administrative (BPA) was directed to fund operations and maintenance (O&M) for the facilities. Two acclimation facilities, Captain John Rapids and Pittsburg Landing, are located on the Snake River between Asotin, WA and Hells Canyon Dam and one facility, Big Canyon, is located on the Clearwater River at Peck. The Capt. John Rapids facility is a single pond while the Pittsburg Landing and Big Canyon sites consist of portable fish rearing tanks assembled and disassembled each year. Acclimation of 450,000 yearling smolts (150,000 each facility) begins in March and ends 6 weeks later. When available, an additional 2,400,000 fall Chinook sub-yearlings may be acclimated for 6 weeks, following the smolt release. The project goal is to increase the naturally spawning population of Snake River fall Chinook salmon upstream of Lower Granite Dam. This is a supplementation project; in that hatchery produced fish are acclimated and released into the natural spawning habitat for the purpose of returning a greater number of spawners to increase natural production. Only Snake River stock is used and production of juveniles occurs at Lyons Ferry Hatchery. This is a long-term project, targeted to work towards achieving

  2. 78 FR 38027 - Wilkesboro Hydroelectric Company, LLC; Wilkesboro Hydropower, LLC; Notice of Application for...

    Science.gov (United States)

    2013-06-25

    ... Energy Regulatory Commission Wilkesboro Hydroelectric Company, LLC; Wilkesboro Hydropower, LLC; Notice of..., Wilkesboro Hydroelectric Company, LLC (transferor) and Wilkesboro Hydropower, LLC (transferee) filed an application for the transfer of license for the W. Kerr Scott Hydropower Project, FERC No. 12642, located on...

  3. The small-scale hydroelectric power plant project 'Les Esserts' in Boudry, Switzerland - Feasibility study and preliminary planning; Centrale des Esserts a Boudry. Etude de faisabilite et avant-projet detaille

    Energy Technology Data Exchange (ETDEWEB)

    Roelli, P.; Croci, S.; Ernst, J.-R.

    2004-07-01

    This report describes in details the project of the installation of a small-scale hydroelectric power plant on the river Areuse in Switzerland. Located on a 4 m high waterfall the plant includes a 10-13 m{sup 3}/s Kaplan turbine, which should deliver roughly 1.6 GWh/year for an installed power of about 500 kVA. The authors insist on the ecological aspect of the project. The plant will be built underground; the river track will be practically unchanged and the existing fish ladder maintained. The report includes maps and pictures of the site as well as technical drawings of the installation. An economic analysis of the project is presented and its viability is discussed. Finally, the authors state that the energy produced by this plant will certainly be certified under one of the Swiss labels 'naturemade star' or 'naturemade basic', in the framework of the federal government's promotion of renewable energy sources.

  4. Hydroelectric production, pump-turbines for high fall. The hydroelectric equipping of la Coche (Savoie). Dams life. Dams ecology and management. Activities of the control services. Hydroelectric statistics; Production hydroelectrique, turbines-pompes pour haute chute. L'amenagement hydroelectrique de la Coche (Savoie). La vie des barrages. L'ecologie et la gestion des barrages. Activites des services du controle. Statistiques hydroelectriques

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1999-07-01

    This issue of Barrages newsletter comprises 5 articles. The first article deals with the pumped storage facility of la Coche (Savoie, France). This type of storage facility requires the use of specific reversible pump-turbines for high fall reservoirs (900 m). This paper describes the advantages and drawbacks of multi-stage reversible hydraulic machineries and the installation of the la Coche facility. The second article reports on the results of decennial and annual inspections of French dams for the second quarter of 1999: fissures propagation, water oozing, leaks, concrete swelling etc.. Only the observations requiring a special follow-up are reported. The third article is devoted to the degradation of the aquatic ecosystems during periods of dryness and periods of draining (water chemistry, biological and sedimentological surveys). The forth article reports on some important facts (accidents, reservoirs emptying, administrative instructions, technical meetings, planning of inspections etc.). The last article is just a graph and a table summarizing the status of reservoirs filling and power production during the second quarter of 1999. (J.S.)

  5. 76 FR 61689 - Sutton Hydroelectric Company, LLC

    Science.gov (United States)

    2011-10-05

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sutton Hydroelectric Company, LLC Notice of Site Visit On February 6, 2008, Sutton Hydroelectric Company, LLC (Sutton Hydroelectric) filed a notice of intent and...

  6. Analysis on Stability Simulation of Right Abutment Slope, Delsi-Tanisagua Hydroelectric Project, Ecuador%厄瓜多尔德尔西水电站右坝肩边坡稳定性模拟分析

    Institute of Scientific and Technical Information of China (English)

    梁晓波; 张为法

    2014-01-01

    基于厄瓜多尔德尔西水电站前期地质勘查资料,用Gocad软件建立右坝肩边坡的三维地质模型,导入Flac3d做弹塑性分析和强度折减计算,根据计算所得位移场和应力场的分布规律,分析评价右坝肩边坡的天然稳定性,探讨边坡的可能破坏情况。%Based on data on geological exploration at the feasible study stage of Delsi-Tanisagua Hydroelectric Project in Ecuador, 3D geological model of slope in right abutment is built with Gocad.Then Flac3d is introduced to perform the elastic-plastic analysis and the strength reduction calculation.In accordance with the distribution law of displacement field and stress field from the calculation, the natural stability of the slope in the right abutment is analyzed and assessed, and the potential failure of the slope isstudied.

  7. Otolith output - Project to study alternative life history types of fall Chinook based on otoliths

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The life-history complexity of Snake River fall Chinook salmon has hindered efforts to manage the ESU. In particular, the existence of an overwintering behavior in a...

  8. 77 FR 12280 - FFP Missouri 17, LLC BOST2 Hydroelectric, LLC; Notice Announcing Filing Priority for Preliminary...

    Science.gov (United States)

    2012-02-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Missouri 17, LLC BOST2 Hydroelectric, LLC; Notice Announcing Filing... priority is as follows: 1. BOST2 Hydroelectric, LLC, Project No. 13826-000. 2. FFP Missouri 17,...

  9. The importance of cultural aspects in impact assessment and project: developmentreflections from a case study of a hydroelectric dam in Brazil

    NARCIS (Netherlands)

    Hanna de Almeida Oliveira, Philippe; Vanclay, Frank; Langdon, Esther Jean; Arts, Jos

    2016-01-01

    Failure to consider the cultural and social factors of projects can lead to situations where mitigation does not effectively address the impacts they were intended to alleviate, and can even create other impacts. We critically analyse the processes of designing and implementing a social and

  10. The importance of cultural aspects in impact assessment and project: developmentreflections from a case study of a hydroelectric dam in Brazil

    NARCIS (Netherlands)

    Hanna de Almeida Oliveira, Philippe; Vanclay, Frank; Langdon, Esther Jean; Arts, Jos

    2016-01-01

    Failure to consider the cultural and social factors of projects can lead to situations where mitigation does not effectively address the impacts they were intended to alleviate, and can even create other impacts. We critically analyse the processes of designing and implementing a social and environm

  11. Automation of hydroelectric power plants

    Energy Technology Data Exchange (ETDEWEB)

    Grasser, H.S. (Consolidated Papers, Inc., Wisconsin Rapids, WI (US))

    1990-03-01

    This paper describes how the author's company has been automating its hydroelectric generating plants. The early automations were achieved with a relay-type supervisory control system, relay logic, dc tachometer, and a pneumatic gate-position controller. While this system allowed the units to be started and stopped from a remote location, they were operated at an output that was preset by the pneumatic control at the generating site. The supervisory control system at the site provided such information as unit status, generator breaker status, and a binary coded decimal (BCD) value of the pond level. The generating units are started by energizing an on-site relay that sets the pneumatic gate controller to a preset value above the synchronous speed of the hydroelectric generator. The pneumatic controller then opens the water-wheel wicket gates to the preset startup position. As the hydroelectric generator starts to turn, the machine-mounted dc tachometer produces a voltage. At a dc voltage equivalent to synchronous speed, the generator main breaker closes, and a contact from the main breaker starts a field-delay timer. Within a few seconds, the field breaker closes. Once the cycle is complete, a relay changes the pneumatic setpoint to a preset operating point of about 8/10 wicket gate opening.

  12. Small hydroelectric power system for the Penasco Valley

    Energy Technology Data Exchange (ETDEWEB)

    Edgel, W.R.

    1982-05-01

    Development of hydroelectric power with attendant improvements to the existing irrigation system is proposed for the Penasco Valley in southeastern New Mexico. The area is presently plagued by spring floods and summer drought, and by high energy costs, both of which limit the agricultural activity in the area to a fraction of what it could be given adequate water and power. The proposed solution is to use pipelines to carry water past sinks in the river channel through several small hydroelectric plants to the point of release for irrigation. This report describes the results of the reconnaissance study. Additional funding will be sought from EMD and other agencies for continuation of the project. Successful completion of the project will (1) harness an inconsistent river to provide power and a permanent water supply, (2) displace remotely generated power and reduce line losses, (3) increase agricultural production in the area, and (4) possibly precipitate industrial development.

  13. Alaska Regional Energy Resources Planning Project, Phase 2: coal, hydroelectric, and energy alternatives. Volume III. Alaska's alternative energies and regional assessment inventory update

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    The Alaska Regional Energy Resources Planning Project is presented in three volumes. This volume, Vol. III, considers alternative energies and the regional assessment inventory update. The introductory chapter, Chapter 12, examines the historical background, current technological status, environmental impact, applicability to Alaska, and siting considerations for a number of alternative systems. All of the systems considered use or could use renewable energy resources. The chapters that follow are entitled: Very Small Hydropower (about 12 kW or less for rural and remote villages); Low-Temperature Geothermal Space Heating; Wind; Fuel Cells; Siting Criteria and Preliminary Screening of Communities for Alternate Energy Use; Wood Residues; Waste Heat; and Regional Assessment Invntory Update. (MCW)

  14. Quality Management and Control on Hydroelectric Project Construction%水电工程施工质量管理与控制

    Institute of Scientific and Technical Information of China (English)

    邹淑梅

    2011-01-01

    Quality of hydropower projects has the problems of poor quality awareness, imperfect quality control system, poor workers' technical level; the responsibility to implement is not in place and so on.Therefore, we must establish a sound quality assurance system and implement a comprehensive, full-process quality management, and establish quality supervision system and quality supervision system.Meanwhile, we should do a good job in construction management and control of environmental protection.%我国水电工程施工质量目前存在着质量意识差、质量控制体系不健全、作业人员技术水平差、责任落实不到位等问题.因此,必须建立健全质量保证体系,推行全面、全过程质量管理,建立质量监督制度,建立质量监理制度.同时,要做好施工中环境保护管理与控制.

  15. Accurate falls risk assessment and interventions for preventing falls in patients in the acute care setting within a private hospital in a large capital city: a best practice implementation project.

    Science.gov (United States)

    Szymaniak, Samara

    2015-09-01

    Patient falls are a leading cause of adverse events in Australian hospitals. Most Australian hospitals have fall prevention policies, procedures and programs for preventing inpatient falls; however despite these resources many preventable falls continue to occur in Australian hospitals.It is imperative that clinicians understand the potential impact of inpatient falls, and what triggers can be identified and managed by a multifactorial team approach. Patients admitted to hospital often experience changes in physical and/or cognitive function which is then exacerbated by an unfamiliar environment and medical interventions. Adverse outcomes post falling can range from minor injuries such as skin tears to significant injuries such as intracranial hemorrhages and fractures which can ultimately result in permanent disability or death.In 2007, Calvary Wakefield Hospital implemented a Falls Minimization Program requiring routine assessment of all patients admitted using an Admission Risk Screening Tool in conjunction with completion of a detailed Falls Risk Assessment Tool when indicated. The aim of this implementation was to review current nursing practice against compliance with the Falls Minimization Program and also identify areas for improvement with a focus on preventative strategies. It was essential that the project and its outcomes also complement the National Safety and Quality Health Service Standards (standard 10 - Preventing Falls and Harm from Falls) that provide a benchmark for Calvary Wakefield Hospital. This was achieved by completing a baseline audit, implementing a corrective action plan post audit and then re-auditing in three months once strategies had been implemented This project used the pre- and post-implementation audit strategy made up of eight criteria using the Joanna Briggs Institute Practical Application of Clinical Evidence System and Getting Research into Practice. The audit, review, implementation and re-audit sequence was the strategy

  16. Legal obstacles and incentives to the development of small scale hydroelectric power in Kentucky

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are examined. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. Additional sections cover acquisition; liability; Department for Natural Resources and Environmental Protection; energy utilities; local regulations; incidental impacts; financial considerations; and sources of information. In Kentucky, many of the impacts have not been implemented with regard to small-scale hydroelectric energy, since in Kentucky most electricity is coal-generated and any hydroelectric power that does exist, is derived from TVA or the Army Corp of Engineer projects.

  17. Digital Modeling and Visualization of Hydroelectric Engineering Geoinformation

    Institute of Scientific and Technical Information of China (English)

    LIU Donghai; ZHONG Denghua; LI Mingchao

    2006-01-01

    To describe the spatial tendency and complex relationship of geological structures, a digital modeling based on geographic information system and the visualization of hydroelectric engineering geology information are presented. The functions of information visual query, spatial cutting,section drawing, and coupled analysis with hydraulic structures are realized. The geologic model can match the attribute data with the shape data of geological structures, and organize the information for spatial query and analysis of the 3D model. With an application in Laxiwa hydroelectric project on the upriver of Huanghe River, the method provides a 3D parallel section view and query results of geoinformation, and 3D section views of geoinformation along axis of spillway tunnel, and along the 5th axis with underground structures, respectively.

  18. Assessment: Projections of Its Decline and Fall with Suggestions for Its Resurrection.

    Science.gov (United States)

    Nolen, P. A.

    1986-01-01

    Paraprofessional training in administration and scoring of educational and psychological tests for learning disability diagnosis is examined, and it is concluded that projected disadvantages outweigh advantages, indicating caution in adopting the practice. (Author/CL)

  19. Least cost addition of power from hydroelectrical developments: Maximizing existing assets

    Energy Technology Data Exchange (ETDEWEB)

    Felix, Lafontant; Briand, Marie-Helene; Veilleux, Rheaume

    2010-09-15

    Hydroelectric developments built in the early 1900's are nearing their useful lifespan and require significant rehabilitation in order to meet modern safety and performance criteria. Also, global increasing energy costs represent a strong incentive for operators to find low-cost, environment-friendly solutions while increasing energy generation at existing facilities. Projects promoting innovative ways of recycling existing developments are great examples of sustainable development and represent win-win solutions for population and hydropower industry alike. The proposed presentation describes successful projects consisting in the rehabilitation or addition of power to existing hydroelectric. These recycling projects are very attractive from both economic and environmental.

  20. Albeni Falls Wildlife Mitigation Project; Idaho Department of Fish and Game 2007 Final Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Cousins, Katherine [Idaho Department of Fsh and Game

    2009-04-03

    The Idaho Department of Fish and Game maintained a total of about 2,743 acres of wildlife mitigation habitat in 2007, and protected another 921 acres. The total wildlife habitat mitigation debt has been reduced by approximately two percent (598.22 HU) through the Department's mitigation activities in 2007. Implementation of the vegetative monitoring and evaluation program continued across protected lands. For the next funding cycle, the IDFG is considering a package of restoration projects and habitat improvements, conservation easements, and land acquisitions in the project area.

  1. 18 CFR 420.51 - Hydroelectric power plant water use charges.

    Science.gov (United States)

    2010-04-01

    ... increased hydraulic head available to the hydroelectric project as a result of investments by the Commission... increased hydraulic head are in effect. (3) Charges for the use of any facilities such as pipe conduits, outlet works, and so on, installed in, on or near a Commission-sponsored project that benefit...

  2. 75 FR 77862 - FFP Missouri 16, LLC, Solia 9 Hydroelectric, LLC; Notice of Competing Preliminary Permit...

    Science.gov (United States)

    2010-12-14

    ... Energy Regulatory Commission FFP Missouri 16, LLC, Solia 9 Hydroelectric, LLC; Notice of Competing... Competing Applications December 7, 2010. On August 6, 2010, FFP Missouri 16, LLC (FFP) and Solia 9... owners' express permission. FFP's Mississippi Lock and Dam 15 Project (Project No. 13825-000)...

  3. RlSC & DSP Advanced Microprocessor System Design; Sample Projects, Fall 1991

    OpenAIRE

    Fredine, John E.; Goeckel, Dennis L.; Meyer, David G.; Sailer, Stuart E.; Schmottlach, Glenn E.

    1992-01-01

    RlSC & DSP Microprocessor System Design (EE 595M) provides students with an overview of reduced instruction set (RISC) microprocessors and digital signal processing (DSP) microprocessors, with emphasis on incorporating these devices in general purpose and embedded system designs, respectively. The first half of the course emphasizes design considerations for RlSC microprocessor based computer systems; a half-semester design project focuses on design principles that could be utilized in a gene...

  4. Optimal control of hydroelectric facilities

    Science.gov (United States)

    Zhao, Guangzhi

    This thesis considers a simple yet realistic model of pump-assisted hydroelectric facilities operating in a market with time-varying but deterministic power prices. Both deterministic and stochastic water inflows are considered. The fluid mechanical and engineering details of the facility are described by a model containing several parameters. We present a dynamic programming algorithm for optimizing either the total energy produced or the total cash generated by these plants. The algorithm allows us to give the optimal control strategy as a function of time and to see how this strategy, and the associated plant value, varies with water inflow and electricity price. We investigate various cases. For a single pumped storage facility experiencing deterministic power prices and water inflows, we investigate the varying behaviour for an oversimplified constant turbine- and pump-efficiency model with simple reservoir geometries. We then generalize this simple model to include more realistic turbine efficiencies, situations with more complicated reservoir geometry, and the introduction of dissipative switching costs between various control states. We find many results which reinforce our physical intuition about this complicated system as well as results which initially challenge, though later deepen, this intuition. One major lesson of this work is that the optimal control strategy does not differ much between two differing objectives of maximizing energy production and maximizing its cash value. We then turn our attention to the case of stochastic water inflows. We present a stochastic dynamic programming algorithm which can find an on-average optimal control in the face of this randomness. As the operator of a facility must be more cautious when inflows are random, the randomness destroys facility value. Following this insight we quantify exactly how much a perfect hydrological inflow forecast would be worth to a dam operator. In our final chapter we discuss the

  5. Integrated solutions for sustainable fall prevention in primary care, the iSOLVE project: a type 2 hybrid effectiveness-implementation design.

    Science.gov (United States)

    Clemson, Lindy; Mackenzie, Lynette; Roberts, Chris; Poulos, Roslyn; Tan, Amy; Lovarini, Meryl; Sherrington, Cathie; Simpson, Judy M; Willis, Karen; Lam, Mary; Tiedemann, Anne; Pond, Dimity; Peiris, David; Hilmer, Sarah; Pit, Sabrina Winona; Howard, Kirsten; Lovitt, Lorraine; White, Fiona

    2017-02-07

    Despite strong evidence giving guidance for effective fall prevention interventions in community-residing older people, there is currently no clear model for engaging general medical practitioners in fall prevention and routine use of allied health professionals in fall prevention has been slow, limiting widespread dissemination. This protocol paper outlines an implementation-effectiveness study of the Integrated Solutions for Sustainable Fall Prevention (iSOLVE) intervention which has developed integrated processes and pathways to identify older people at risk of falls and engage a whole of primary care approach to fall prevention. This protocol paper presents the iSOLVE implementation processes and change strategies and outlines the study design of a blended type 2 hybrid design. The study consists of a two-arm cluster randomized controlled trial in 28 general practices and recruiting 560 patients in Sydney, Australia, to evaluate effectiveness of the iSOLVE intervention in changing general practitioner fall management practices and reducing patient falls and the cost effectiveness from a healthcare funder perspective. Secondary outcomes include change in medications known to increase fall risk. We will simultaneously conduct a multi-methodology evaluation to investigate the workability and utility of the implementation intervention. The implementation evaluation includes in-depth interviews and surveys with general practitioners and allied health professionals to explore acceptability and uptake of the intervention, the coherence of the proposed changes for those in the work setting, and how to facilitate the collective action needed to implement changes in practice; social network mapping will explore professional relationships and influences on referral patterns; and, a survey of GPs in the geographical intervention zone will test diffusion of evidence-based fall prevention practices. The project works in partnership with a primary care health network, state

  6. The Streamlining of the Kabinakagami River Hydroelectric Project Environmental Assessment: What is the "Duty to Consult" with Other Impacted Aboriginal Communities When the Co-Proponent of the Project is an Aboriginal Community?

    Directory of Open Access Journals (Sweden)

    Holly L. Gardner

    2015-06-01

    Full Text Available There is existing tension within many Aboriginal communities between economic development and preservation of traditional lands for the continued practice of traditional activities. The "duty to consult" doctrine has has become an important mechanism by which these concerns were identified and addressed (when possible prior to development. This is a legal requirement that is rooted in the Constitution Act (1982 and subsequent legal case law that has further defined and outlined requirements under this obligation. This article describes the process that was carried out to advance the proposed Kabinakagami River Hydro Project Class Environmental Assessment in Northern Ontario, Canada with an emphasis on the approach to Aboriginal consultation. This project is unique because the co-proponent of the project is an Aboriginal community, with several neighbouring Aboriginal communities potentially affected by the project. This project raises questions about the approach to carrying out the duty to consult in an effective way. An evaluative framework was developed to examine timeline, information, means, and flexibility and transparency of the process to highlight shortcomings in the process and make recommendations for improvement.

  7. The Rise and Fall of the Social Science Curriculum Project in Iceland, 1974-1984: Reflections on Reason and Power in Educational Progress.

    Science.gov (United States)

    Edelstein, Wolfgang

    1987-01-01

    Examines the demise of the Icelandic Social Science Curriculum Project (SSCP) as an example of progressive educational reform thwarted by neofundamentalist ideologies. States that the paper goes beyond Jerome Bruner's 1984 account of the rise and fall of "Man: A Course of Study" to provide a deeper analysis of the politics of…

  8. The Rise and Fall of the Social Science Curriculum Project in Iceland, 1974-1984: Reflections on Reason and Power in Educational Progress.

    Science.gov (United States)

    Edelstein, Wolfgang

    1987-01-01

    Examines the demise of the Icelandic Social Science Curriculum Project (SSCP) as an example of progressive educational reform thwarted by neofundamentalist ideologies. States that the paper goes beyond Jerome Bruner's 1984 account of the rise and fall of "Man: A Course of Study" to provide a deeper analysis of the politics of…

  9. 75 FR 19989 - Final Environmental Impact Statement for Drought Management Planning at the Kerr Hydroelectric...

    Science.gov (United States)

    2010-04-16

    ... Bureau of Indian Affairs Final Environmental Impact Statement for Drought Management Planning at the Kerr... Management Planning at the Kerr Hydroelectric Project, Flathead Lake, Montana, is now available for public review and comment. DATES: The BIA will issue a final decision on drought management planning at the Kerr...

  10. Hydroelectric power plant Irape - viability studies; Usina hidroeletrica Irape - estudos de viabilidade

    Energy Technology Data Exchange (ETDEWEB)

    Serran, F.P.; Assumpcao, M.G.

    1994-06-01

    The socio-environmental analysis of the feasibility studies from Irape Hydroelectric Power Plant in Minas Gerais State-Brazil was described including three main questions: the regional insertion mentioning the social conflicts, the social communication program and the basic strategic; the reduction of water volume downstream; the development of programs on the Basic Project Stage.

  11. 77 FR 9231 - FFP Missouri 17, LLC; BOST2 Hydroelectric, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission FFP Missouri 17, LLC; BOST2 Hydroelectric, LLC; Notice Announcing... Parish, Louisiana. The applications were filed by FFP Missouri 17, LLC for Project No. 13824- 000...

  12. 75 FR 3219 - Richard Moss; Notice of Authorization for Continued Project Operation

    Science.gov (United States)

    2010-01-20

    ... January 12, 2010. On January 31, 2008, Richard Moss, licensee for the Cinnamon Ranch Hydroelectric Project... regulations thereunder. The Cinnamon Ranch Hydroelectric Project is located on the Middle, Birch, and... operation of the Cinnamon Ranch Hydroelectric Project, until such time as the Commission acts on...

  13. Daily storage management of hydroelectric facilities

    NARCIS (Netherlands)

    Chappin, E.J.L.; Ferrero, M.; Lazzeroni, P.; Lukszo, Z.; Olivero, M.; Repetto, M.

    2012-01-01

    This work presents a management procedure for hydroelectric facilities with daily storage. The water storage gives an additional degree of freedom allowing to shift in time power production when it is more convenient and to work at the maximum efficiency of hydraulic turbine. The management is optim

  14. Hydroelectric developments in Nunavik : update on impact benefit agreements

    Energy Technology Data Exchange (ETDEWEB)

    Aatami, P. [Makivik Corp., Makivik, NF (Canada)

    2004-07-01

    The Partnership Agreement on Economic and Community Development in Nunavik is intended to accelerate development of natural resources in Nunavik and promote autonomy of the Inuit regional organizations. This can be accomplished through hydroelectric projects, mining, sport hunting, outfitting and tourism. In recent years, activities in these domains have raised fundamental questions pertaining to the advantages and disadvantages of resource development. The role that the Impact Benefit Agreement has on business opportunities has been examined more closely. The results of the Impact Benefit Agreement and its implication for the Cree Nation and hydro development in untapped regions of northern Quebec were described along with the role of the parties in financing future projects. An overview of the costs, benefits and considerations for hydro opportunities in northern Quebec was presented with reference to the electricity grid and the incentives for large investment. 1 fig.

  15. Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility

    Energy Technology Data Exchange (ETDEWEB)

    Jack Q. Richardson

    2012-06-28

    Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project cost match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.

  16. Counter rotating type hydroelectric unit suitable for tidal power station

    Energy Technology Data Exchange (ETDEWEB)

    Kanemoto, T [Faculty of Engineering, Kyushu Institute of Technology, Sensui 1-1, Tobata, Kitakyushu 804-8550 (Japan); Suzuki, T, E-mail: turbo@tobata.isc.kyutech.ac.j [Graduate School of Engineering, Kyushu Institute of Technology, Sensui 1-1, Tobata, Kitakyushu 804-8550 (Japan)

    2010-08-15

    The counter rotating type hydroelectric unit, which is composed of the axial flow type tandem runners and the peculiar generator with double rotational armatures,was proposed to utilize effectively the tidal power. In the unit, the front and the rear runners counter drive the inner and the outer armatures of the generator, respectively. Besides, the flow direction at the rear runner outlet must coincide with the flow direction at the front runner inlet, because the angular momentum through the rear runner must coincides with that through the front runner. That is, the flow runs in the axial direction at the rear runner outlet while the axial inflow at the front runner inlet. Such operations are suitable for working at the seashore with rising and falling tidal flows, and the unit may be able to take place of the traditional bulb type turbines. The tandem runners were operated at the on-cam conditions, in keeping the induced frequency constant. The output and the hydraulic efficiency are affected by the adjustment of the front and the blade setting angles. The both optimum angles giving the maximum output and/or efficiency were presented at the various discharges/heads. To promote more the tidal power generation by this type unit, the runners were also modified so as to be suitable for both rising and falling flows. The hydraulic performances are acceptable while the output is determined mainly by the trailing edge profiles of the runner blades.

  17. Effectiveness of Non-Pharmacological Interventions to Prevent Falls in Older People: A Systematic Overview. The SENATOR Project ONTOP Series

    Science.gov (United States)

    Rimland, Joseph M.; Abraha, Iosief; Dell’Aquila, Giuseppina; Cruz-Jentoft, Alfonso; Soiza, Roy; Gudmusson, Adalsteinn; Petrovic, Mirko; O’Mahony, Denis; Todd, Chris; Cherubini, Antonio

    2016-01-01

    Background Falls are common events in older people, which cause considerable morbidity and mortality. Non-pharmacological interventions are an important approach to prevent falls. There are a large number of systematic reviews of non-pharmacological interventions, whose evidence needs to be synthesized in order to facilitate evidence-based clinical decision making. Objectives To systematically examine reviews and meta-analyses that evaluated non-pharmacological interventions to prevent falls in older adults in the community, care facilities and hospitals. Methods We searched the electronic databases Pubmed, the Cochrane Database of Systematic Reviews, EMBASE, CINAHL, PsycINFO, PEDRO and TRIP from January 2009 to March 2015, for systematic reviews that included at least one comparative study, evaluating any non-pharmacological intervention, to prevent falls amongst older adults. The quality of the reviews was assessed using AMSTAR and ProFaNE taxonomy was used to organize the interventions. Results Fifty-nine systematic reviews were identified which consisted of single, multiple and multifactorial non-pharmacological interventions to prevent falls in older people. The most frequent ProFaNE defined interventions were exercises either alone or combined with other interventions, followed by environment/assistive technology interventions comprising environmental modifications, assistive and protective aids, staff education and vision assessment/correction. Knowledge was the third principle class of interventions as patient education. Exercise and multifactorial interventions were the most effective treatments to reduce falls in older adults, although not all types of exercise were equally effective in all subjects and in all settings. Effective exercise programs combined balance and strength training. Reviews with a higher AMSTAR score were more likely to contain more primary studies, to be updated and to perform meta-analysis. Conclusions The aim of this overview of

  18. Hydroelectricity - An Answer To Energy Needs

    Energy Technology Data Exchange (ETDEWEB)

    Francois-Xausa, Maryse; Havard, David; Czerwinski, Francois; Teller, Olivier

    2010-09-15

    The energy challenges of the next 30 years appear daunting and, in certain cases, in conflict with one another. Their complexity is such that one solution alone cannot provide a full answer. It is nevertheless equally clear that hydro-electricity, being renewable, proven, highly efficient, storable and with still very significant resource potential, possesses a unique combination of attributes which will aid decision-makers to plan and execute energy development with confidence.

  19. Upgrading hydro-electric generating facilities

    Energy Technology Data Exchange (ETDEWEB)

    Coulson, D.M.; Villalon, M.

    1987-11-01

    Approximately 1,720,000 kW of installed hydro-electric generating capacity is either owned directly by pulp and paper companies in Canada or is operated principally in their service. The 216 units involved were commissioned between 1902 and 1982. This paper suggests an approach to upgrading the generating units themselves as well as the related electrical and mechanical equipment and civil structures, giving approximate durations and costs. A complete system study is recommended. 2 refs., 2 figs., 3 tabs.

  20. Ultra-low-head hydroelectric technology: A review

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Daqing; Deng, Zhiqun (Daniel)

    2017-10-01

    In recent years, distributed renewable energy-generation technologies, such as wind and solar, have developed rapidly. Nevertheless, the utilization of ultra-low-head (ULH) water energy (i.e., situations where the hydraulic head is less than 3 m or the water flow is more than 0.5 m/s with zero head) has received little attention. We believe that, through technological innovations and cost reductions, ULH hydropower has the potential to become an attractive, renewable, and sustainable resource. This paper investigates potential sites for ULH energy resources, the selection of relevant turbines and generators, simplification of civil works, and project costs. This review introduces the current achievements on ULH hydroelectric technology to stimulate discussions and participation of stakeholders to develop related technologies for further expanding its utilization as an important form of renewable energy.

  1. Hydroelectric System Response to Part Load Vortex Rope Excitation

    Science.gov (United States)

    Alligné, S.; Nicolet, C.; Bégum, A.; Landry, C.; Gomes, J.; Avellan, F.

    2016-11-01

    The prediction of pressure and output power fluctuations amplitudes on Francis turbine prototype is a challenge for hydro-equipment industry since it is subjected to guarantees to ensure smooth and reliable operation of the hydro units. The European FP7 research project Hyperbole aims to setup a methodology to transpose the pressure fluctuations induced by the cavitation vortex rope on the reduced scale model to the prototype generating units. A Francis turbine unit of 444MW with a specific speed value of v = 0.29, is considered as case study. A SIMSEN model of the power station including electrical system, controllers, rotating train and hydraulic system with transposed draft tube excitation sources is setup. Based on this model, a frequency analysis of the hydroelectric system is performed to analyse potential interactions between hydraulic excitation sources and electrical components.

  2. Report on technical feasibility of underground pumped hydroelectric storage

    Science.gov (United States)

    Doherty, T. J.

    1982-03-01

    The technical and economic aspects of constructing a very high head underground hydroelectric pumped storage were examined at a prefeasibility level. Excavation of existing caverns in the West Rutland Vermont marble quarry would be used to construct the underground space. A plant capacity of 1200 MW and 12 h of continuous capacity were chosen as plant operating conditions. The site geology, plant design, and electrical and mechanical equipment required were considered. It was concluded that the cost of the 1200 MW underground pumped storage hydro electric project at this site, even with the proposed savings from marketable material, amount to between $581 and $595 per kilowatt of installed capacity on a January 1982 pricing level. It was concluded that the West Rutland underground pumped storage facility is uneconomic at this time.

  3. Design of the dam and south dyke at the Toulnustouc hydroelectric development project; Conception du barrage et de la digue sud de l'amenagement hydroelectrique de la Toulnustouc

    Energy Technology Data Exchange (ETDEWEB)

    Beausejour, N.; Bouzaiene, H. [RSW Inc., Montreal, PQ (Canada); Hammamji, Y.; Bigras, A.; Bergeron, A. [Hydro-Quebec Equipment, Montreal, PQ (Canada)

    2006-07-01

    The Toulnustouc hydroelectric dam is located approximately 120 km north of Baie-Comeau, Quebec and has been in operation since 2005. New development involved expanding the existing Lac-Sainte-Anne reservoir by 22 km{sup 2} through the construction of a new 77 m high and 535 m long dam and a 46 m high and 400 m long south dyke. This paper described the geology of the area and presented details of the main dam, instrumentation and stability analysis. The main concrete face rockfill dam (CFRD) lies on a foundation of bedrock. This paper presented the predictions of the upstream face displacements and the internal movements that develop in the rockfill embankment during the construction phase and the reservoir filling. The materials for the embankment dam were assumed to be non-linear, stress dependent and stress history dependent. The prediction displacements of the upstream face were compared to the displacement measured by monitors installed on the concrete face during the filling of the reservoir. The south dyke was constructed in an effort to control and reduce water infiltration under the foundation and to raise the crest of the reservoir. The principal criteria used for the design of the south dyke and the CFRD was presented. These included design wave and freeboard; ice loading on the upstream slab; geometry of the fill; material types with layer thickness and compaction criteria; stress and deformation of the fill; stability of the slope in both static and seismic conditions; extruded curb as stabilization method of the upstream slope, concrete slab, plinth, parapet, perimeter joint and waterstops; foundation treatment; and, instrumentation. During reservoir filling, the measured deformations and seepage were found to be lower than expected. 7 refs., 1 tab., 3 figs.

  4. Falling chains

    Science.gov (United States)

    Wong, Chun Wa; Yasui, Kosuke

    2006-06-01

    The one-dimensional fall of a folded chain with one end suspended from a rigid support and a chain falling from a resting heap on a table is studied. Because their Lagrangians contain no explicit time dependence, the falling chains are conservative systems. Their equations of motion are shown to contain a term that enforces energy conservation when masses are transferred between subchains. We show that Cayley's 1857 energy nonconserving solution for a chain falling from a resting heap is incorrect because it neglects the energy gained when a link leaves a subchain. The maximum chain tension measured by Calkin and March for the falling folded chain is given a simple if rough interpretation. Other aspects of the falling folded chain are briefly discussed.

  5. Joint Venture Modes of Water Conservancy and Hydroelectric Engineering

    Directory of Open Access Journals (Sweden)

    Zhiding Chen

    2013-07-01

    Full Text Available With the long construction period, the giant scope and complex technology, water conservancy and hydroelectric engineering construction has large investment. In the fully competitive water conservancy and hydropower project construction contracting market, it is almost impossible for a company to contract with a water conservancy and hydropower project independently. Therefore, water conservancy and hydropower project construction can be contracted by several construction companies together, to play each company's strengths, lower offer, improve project quality, shorten the construction period and win the competition. In this paper, we started from the definition of Joint Venture, summed up the forms of Joint Venture in water conservancy and hydropower engineering, proposed that the JV modes can be divided into domestic and international union, tight mode, half-tight mode, loose mode, incorporation and consortium. Furthermore, we analyzed the advantages and disadvantages of Joint Venture. Put forward that the JV can relieve the owner from interfacial administrative work, reduce risk of engineering, and raise the success rate of engineering contract, improve the correctness of price and increase the opportunity of project contracting, Learn from other members, enhance technology and management and make full use of idle resources

  6. Effects of the earthquake of March 27, 1964, on the Eklutna Hydroelectric Project, Anchorage, Alaska, with a section on television examination of earthquake damage to underground communication and electrical systems in Anchorage: Chapter A in The Alaska earthquake, March 27, 1964: effects on transportation, communications, and utilities

    Science.gov (United States)

    Logan, Malcolm H.; with a section on Television Examination of Earthquake Damage to Underground Communication and Electrical Systems in Anchorage by Burton, Lynn R.

    1967-01-01

    The March 27, 1964, Alaska earthquake and its associated aftershocks caused damage requiring several million dollars worth of repair to the Eklwtna Hydroelectric Project, 34 miles northeast of Anchorage. Electric service from the Eklutna powerplant was interrupted during the early phase of the March 27 earthquake, built was restored (intermittently) until May 9,1964, when the plant was closed for inspection and repair. Water for Eklutna project is transported from Eklutna Lake to the powerplant at tidewater on Knik Arm of Cook Inlet by an underwater intake connected to a 4.46-mile tunnel penstock. The primary damage caused by the earthquake was 1at the intake structure in Eklutna Lake. No damage to the power tunnel was observed. The piles-supported powerplant and appurtenant structures, Anchorage and Palmer substations, and the transmission lines suffered minor dammage. Most damage occurred to facilities constructed on un-consolidated sediments and overburden which densified and subsided during the earthquake. Structures built on bedrock experienced little or no damage. Underground communication and electrical systems in Anchorage were examined with a small-diameter television camera to locate damaged areas requiring repair. Most of the damage was concentrated at or near valley slopes. Those parts of the systems within the major slide areas of the city were destroyed.

  7. Know-how from Austria for a hydroelectric power plant in Hungary. The Nagymaros power plant is under construction at the Danube river

    Energy Technology Data Exchange (ETDEWEB)

    Fremuth, W.

    1989-06-01

    In Hungary, a hydroelectric power plant is being constructed at the Danube river and is planned to be operated by the CSSR and Hungary. The project management is an Austrian company, Donaukraft, who thus inverts its know-how in hydroelectric power plant construction. The plant is planned to be ready for operation by 1994, and will stretch out over a distance of 180 kilometers along the Danube river, supplying about 171 MW of electricity. (orig.).

  8. Reconnaissance Feasibility Study: Hydroelectric Potential on Lowell Creek

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-03-01

    The feasibility of hydroelectric power development on Lowell Creek near Seward has been investigated at.a reconnaissance level. The study was. conducted because .the physical characteristics of the creek and surrounding terrain initially appeared suitable for hydroelectric power. The creek has a steep gradient (about 400 feet per mile), is fed from a large snowfield, and has two significant drops. One drop is formed by the presence of a dam that was constructed to divert the creek through a mountain and around the town. The second drop of about 65 feet is at the termination of-the diversion tunnel. Three alternative sites for hydroelectric plants were considered, one each at the two drops and one farther upstream at the site of an old abandoned intake and valve house. Two of the sites were considered for 250-kW plants and one for a 100-kW plant. All were limited to a low head, less than 66 feet. Use of an existing dam and tunnel and an abandoned diversion dam and valve house was considered as part of the project alternatives. None of the three alternatives approaches feasibility at this time. Major influencing factors are the high cost of energy at over 13 cents per kWh, the winter freezeup resulting in plant shutdown from November to April, and a large amount of rock sediment carried by the stream and requiring expensive intake structures to skim off the rocks. The most promising alternative (alternative C), which would have a capacity of 250 kW and would produce about 800,000 kWh per year, would fill less than 5 percent of the city's present energy needs. The plant would cost nearly $1 million and produce energy at about 137 mills per kwh. This alternative is the best of the three from the standpoint of its.lower cost, best access via existing all-weather road, least exposure to avalanche and rockslides, and proximity to existing powerlines.

  9. Size and age distributions of Juvenile Connecticut River American shad above Hadley Falls: Influence on outmigration representation and timing

    Science.gov (United States)

    O'Donnell, M. J.; Letcher, B.H.

    2008-01-01

    Age- and size-based habitat use and movement patterns of young-of-year American shad in rivers are not well understood. Adult females reach their natal rivers at different times and ascend the river at different rates, which may lead to variation of hatch dates at a single location. Also, shad are serial spawners, so eggs of the same female may be released at different distances from the river mouth. It has long been hypothesized that juvenile shad emigration is a function of size or age, and not necessarily keyed only to a decrease in water temperature during the fall. We seined three sites in the Connecticut River biweekly to collect pre-migrant shad during river residence (spring to fall). During emigration, samples were also collected weekly at two hydroelectric facilities. Otoliths were removed from ???20% of the fish to obtain age and growth rate information. We found increases in length and age over time until late in the season, after which such increases were mostly insigniftlant. Cohorts collected early in the year as pre-migrants were never sampled as migrants later in the year at the hydroelectric projects. Cohorts collected late in the year as migrants were never collected earlier in the year as pre-migrants. Only during a narrow window of time were fish collected as both pre-migrants and migrants. Fish that were hatched later in the season exhibited higher growth rates than fish that were hatched earlier in the season. Copyright ?? 2008 John Wiley & Sons, Ltd.

  10. A Successful ED Fall Risk Program Using the KINDER 1 Fall RiskAssessment Tool.

    Science.gov (United States)

    Townsend, Ann B; Valle-Ortiz, Marisol; Sansweet, Tracy

    2016-11-01

    Emergency nurses did not perform falls risk assessments routinely on our ED patients; the instrument used was aimed at inpatients. We identified a need to revise fall assessment practices specific to our emergency department. The purpose of the performance improvement project was to reduce ED falls and evaluate the use of an ED-specific fall risk tool, the KINDER 1 Fall Risk Assessment. The plan was to establish fall risk assessment practices at point of ED entry and to decrease total falls.

  11. Methods for generating hydroelectric power development alternatives

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Shoou-yuh; Liaw, Shu-liang; Sale, M.J.; Railsback, S.F.

    1989-01-01

    Hydropower development on large rivers can result in a number of environmental impacts, including potential reductions in dissolved oxygen (DO) concentrations. This study presents a methodology for generating different hydropower development alternatives for evaluation. This methodology employs a Streeter-Phelps model to simulate DO, and the Bounded Implicit Enumeration algorithm to solve an optimization model formulated to maximize hydroelectric energy production subject to acceptable DO limits. The upper Ohio River basin was used to illustrate the use and characteristics of the methodology. The results indicate that several alternatives which meet the specified DO constraints can be generated efficiently, meeting both power and environmental objectives. 17 refs., 2 figs., 1 tab.

  12. Analysis of Environmental Issues Related to Small-Scale Hydroelectric Development II: Design Consideration for Passing Fish Upstream Around Dams

    Energy Technology Data Exchange (ETDEWEB)

    Hildebrandt, S. G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bell, M. C. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Anderson, J. J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Richey, E. P. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Parkhurst, Z. E. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    1980-08-01

    The purpose of this report is to provide general information for use by potential developers of small scale hydroelectric projects that will include facilities to pass migrating fish upstream around dams. The document is not intended to be a textbook on design of fish passage facilities, but rather to be a general guide to some factors that are important when designing such facilities.

  13. The ALFALFA Hα Survey. I. Project Description and The Local Star-formation Rate Density from the Fall Sample

    Science.gov (United States)

    Van Sistine, Angela; Salzer, John J.; Sugden, Arthur; Giovanelli, Riccardo; Haynes, Martha P.; Janowiecki, Steven; Jaskot, Anne E.; Wilcots, Eric M.

    2016-06-01

    The ALFALFA Hα survey utilizes a large sample of H i-selected galaxies from the ALFALFA survey to study star formation (SF) in the local universe. ALFALFA Hα contains 1555 galaxies with distances between ˜20 and ˜100 Mpc. We have obtained continuum-subtracted narrowband Hα images and broadband R images for each galaxy, creating one of the largest homogeneous sets of Hα images ever assembled. Our procedures were designed to minimize the uncertainties related to the calculation of the local SF rate density (SFRD). The galaxy sample we constructed is as close to volume-limited as possible, is a robust statistical sample, and spans a wide range of galaxy environments. In this paper, we discuss the properties of our Fall sample of 565 galaxies, our procedure for deriving individual galaxy SF rates, and our method for calculating the local SFRD. We present a preliminary value of log(SFRD[M ⊙ yr-1 Mpc-3]) = -1.747 ± 0.018 (random) ±0.05 (systematic) based on the 565 galaxies in our Fall sub-sample. Compared to the weighted average of SFRD values around z ≈ 2, our local value indicates a drop in the global SFRD of a factor of 10.2 over that lookback time.

  14. White River Falls Fish Passage Project, Tygh Valley, Oregon : Final Technical Report, Volume II, Appendix A, Fisheries Habitat Inventory.

    Energy Technology Data Exchange (ETDEWEB)

    Oregon. Dept. of Fish and Wildlife; Mount Hood National Forest (Or.)

    1985-06-01

    Stream habitat inventories on 155 stream miles in the White River drainage on the Mt. Hood National Forest are summarized in this report. Inventory, data evaluation, and reporting work were accomplished within the framework of the budgetary agreements established between the USDA Forest Service, Mt. Hood National Forest, and the Bonneville Power Administration, in the first 2 years of a multiyear program. One hundred forty-two stream miles of those inventoried on the Forest appear suitable for anadromous production. The surveyed area appears to contain most or all of the high quality fish habitat which would be potentially available for anadromous production if access is provided above the White River Falls below the Forest boundary. About 34 stream miles would be immediately accessible without further work on the Forest with passage at the Falls. Seventy-two additional miles could be made available with only minor (requiring low investment of money and planning) passage work further up the basin. Thirty-six miles of potential upstream habitat would likely require major investment to provide access.

  15. Falling chains

    CERN Document Server

    Wong, C W; Wong, Chun Wa; Yasui, Kosuke

    2006-01-01

    The one-dimensional falling motion of a bungee chain suspended from a rigid support and of a chain falling from a resting heap on a table is studied. Their Lagrangians are found to contain no explicit time dependence. As a result, these falling chains are conservative systems. Each of their Lagrange's equations of motion is shown to contain a term that enforces energy conservation when masses are transferred between subchains. We show in particular that Cayley's 1857 energy nonconserving solution for a chain falling from a resting heap is incorrect because it neglects the energy gained when the transferred link is emitted by the emitting subchain. The maximum chain tension measured by Calkin and March for the falling bungee chain is given a simple if rough interpretation. In the simplified one-dimensional treatment, the kinetic energy of the center of mass of the falling bungee chain is found to be converted by the chain tension at the rigid support into the internal kinetic energy of the chain. However, as t...

  16. Viewpoint – Fifty Years of Hydroelectric Development in Chile: A History of Unlearned Lessons

    Directory of Open Access Journals (Sweden)

    Michael Nelson

    2013-06-01

    Full Text Available The development of hydroelectricity in Chile illustrates a situation where water resources can be both well and badly managed when a private or public utility company, in this case ENDESA, is powerful enough to operate largely outside standard policy and bureaucratic processes. It successfully increased hydroelectric capacity more than fourfold over three decades characterised by periods of significant political instability. This was done without noticeable conflict due to its recognised efficiency and absence of environmental concerns in Chilean policy until the late 1980s. Since that time there has been increasing pressure from international agencies and NGOs to place more emphasis on environmental dimensions in development. The interplay among the diversity of agendas and tactics adopted by the interest groups attempting to influence decision on hydroelectric projects has, in some cases, been counterproductive. ENDESA chose to withhold information and modify EIA procedures as tactics to reduce costs. The NGOs’ single-minded dedication to preclusion of dam proposals tended to distort public debate. The government, presumably due to risk aversion, proved unwilling to take a proactive stance by not specifying and implementing requirements for approval of a dam project, providing a comprehensive policy framework for debate or facilitating dialogue on the issues.

  17. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 3. Mid-Continent region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The US Corps of Engineers' assessment of the nation's hydroelectric resources provides a current and comprehensive estimate of the potential for incremental or new generation at existing dams and other water resource projects, as well as for undeveloped sites in the US. The demand for hydroelectric power is addressed and various related policy and technical considerations are investigated to determine the incentives, constraints, and impacts of developing hydropower to meet a portion of the future energy demands. The comprehensive data represent the effort of the Corps of Engineers based on site-specific analysis and evaluation. Summary tables include estimates of the potential capacity and energy at each site in the inventory. The number of sites and potential capacity in each state are identified, but specific detailed information is included for sites in Colorado, Kansas, Montana, Nebraska, New Mexico, North Dakota, Oklahoma, South Dakota, Texas, and Wyoming.

  18. [Accidental falls].

    Science.gov (United States)

    Inokuchi, Koichi

    2013-06-01

    Falls are common cause of injuries among elderly people, and fractures are the most serious consequence of falls. For seniors, hip fractures are the second major cause of bedridden. The feature and acute care of head injury, spinal cord injury, vertebrae fracture, and hip fracture are described. Just had fracture fixation, the patient can not go back to the original ADL. In order not to become bedridden, both medication and physical examination are important based on the new disease concept of locomotive syndrome. To do so, requires hospital and clinic cooperation. Sufficient cooperation is not currently possible, and spread of liaison service is essential.

  19. FORESIGHT - ECOSUSTAINABLE DETERMINANTS OF STRATEGIC MODERNIZATION OF HYDROELECTRIC POWER PLANTS

    Directory of Open Access Journals (Sweden)

    L. Dovgan

    2015-08-01

    Full Text Available In the paper the foresight methodology as an ecosustainable determinants of strategic modernization of hydroelectric power plants in the conditions of the external challenges and threats is revealed. The strategic concepts of modernization and a mechanism of strategic modernization of hydroelectric power plants on the principles of public-private partnerships is allocated. Recommendations on the implementation of the results of the strategic foresight to the modernization of hydroelectric power plants in the interaction of public and private agents are formulated.

  20. Development methodologies for the assessment of impacts of small scale hydroelectric power plant projects on migratory fish; Desenvolvimento metodologico para avaliacao de impactos de empreendimentos hidreletricos de pequeno porte sobre peixes migradores

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Lucas Goncalves da; Barradas, Jose Ricardo de Souza [Pontificia Universidade Catolica do Rio Grande do Sul (UFRGS), Porto Alegre, RS (Brazil). Dept. de Biodiversidade e Ecologia], E-mail: lucas.silva@pucrs.br

    2009-10-15

    Dams influence directly the process of fish migration. Assessing the impact of these infrastructure and direct research for that purpose minimize environmental impacts resulting from projects on biodiversity. Through computer models and probability logistic regressions of occurrence that take into account geomorphologic parameters (elevation and basin area) was obtained a standard distribution model of migratory fishes species in the upper Uruguay river basin (RS/SC) with high calibration (84.39% of adherence). The computational modelling significantly increases the knowledge about methodologies for evaluate environmental impacts caused by small and large dams and applicability in other basins. (author)

  1. The Fort McMurray Demonstration Project in Social Marketing: no demonstrable effect on already falling injury rates following intensive community and workplace intervention.

    Science.gov (United States)

    Guidotti, Tee L; Deb, Pooja; Bertera, Robert; Ford, Lynda

    2009-10-01

    The Fort McMurray Demonstration Project in Social Marketing attempted to achieve mutually reinforcing effects from thematically coordinated educational and awareness efforts in the community as a whole and in the workplace and the inclusion of occupational safety within the framework of a community health promotion project. The study community was Fort McMurray, a small, industrial city in northern Alberta. The Mistahiai Health Region, several hundred kilometers to the west and also dominated by one city, Grande Prairie, served as the reference community. The intervention was based on media and events staged at public events, with supporting educational activities in schools and the community. It relied heavily on community-based partners and volunteers. Data on healthcare utilization of selected preventable injuries were obtained from Alberta Health for the time period 1990-1996 for the Regional Health Authorities of Northern Lights, where the only large population centre is Fort McMurray, and Mistahia. Age-adjusted aggregate injury rates were analyzed for evidence of an effect of the intervention. Severity was measured by proxy, using the number of diagnostic claims submitted for reimbursement for medical services in a given year. The communities differed in age-specific injury rates, with Fort McMurray showing higher rates for residents aged less than 55. Young adults and older adolescents showed higher levels of severity. Injury rates fell substantially and at similar rates in both communities over the five-year period. However, in both communities injury rates were already falling before the intervention in Fort McMurray began and continued to fall at about the same rate, slowing toward the end of the period. No evidence was found for an effect of the Project or for acceleration of the reduction in injury frequency in the intervention area. Over the period, fewer medical services were delivered in office settings and more in emergency rooms, in both

  2. Use of mediation to resolve the dispute over low-head hydroelectric development at Swan Lake

    Energy Technology Data Exchange (ETDEWEB)

    O' Connor, D.

    1980-08-01

    In 1978, the Maine Hydroelectric Development Corporation announced that the company planned to renovate five dams on the Goose River near Belfast, Maine to generate electricity. The most important part of the plan involved the use of the first of the dams, at the lower end of Swan Lake, to regulate the flow of water to the downstream dams. For Maine Hydro, management of the Swan Lake dam could make an otherwise marginal proposal lucrative. However, Swan Lake is vitally important to the residents of Swanville. The town was so concerned about the impact of this proposed hydroelectric project that it petitioned the Federal Energy Regulatory Commission (FERC) to deny Maine Hydro's application on the grounds that it would damage the environment, reduce property values and eliminate recreational opportunities for its citizens. This report was written by the mediator of the dispute and represents the views and behavior of the parties as the mediator understood them. It is intended to present the mediator's observations in a way which will inform and assist others who may someday face a difficult situation like the one the Town of Swanville and Maine Hydroelectric Development Corporation faced, and successfully resolved, in the spring and summer of 1979.

  3. Legal obstacles and incentives to the development of small scale hydroelectric power in West Virginia

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric in West Virginia at the state level are described. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by FERC. The development of small-scale hydroelectric energy depends on the selection of a site which will produce sufficient water power capacity to make the project economically attractive to a developer. In West Virginia, the right to use the flowing waters of a stream, creek, or river is appurtenant to the ownership of the lands bordering the watercourse. The lands are known as riparian lands. The water rights are known as riparian rights. Thus, the first obstacle a developer faces involves the acquisition of riparian lands and the subsequent right to the use of the water. The water law in West Virginia is discussed in detail followed by discussions on direct and indirect regulations; continuing obligations; financial considerations; and interstate organizations.

  4. Social-environmental fragility analysis for diagnosis of watershed in study of hydroelectric projects; Analise de fragilidade socioambiental para o diagnostico de bacias hidrograficas no estudo de empreendimentos hidreletricos

    Energy Technology Data Exchange (ETDEWEB)

    Maciel, Jonas Fernandes; Dzedzej, Maira [IX Consultoria e Representacoes Ltda, Itajuba, MG (Brazil); Oliveira, Samuel Torres de; Flauzino, Barbara [IX Consultoria e Representacoes Ltda, Itajuba, MG (Brazil); Universidade Federal de Itajuba, (UNIFEI), MG (Brazil)

    2010-07-01

    This paper presents a methodology for assessing the social-environmental fragility of a watershed where there is potential for installation of hydropower projects. The method includes dividing the watershed into sub areas (by analysis of similar characteristics) and, subsequently, the use of 23 indicators grouped into six social-environmental components (Water Resources and Aquatic Ecosystems, Terrestrial Ecosystems and the Physical Environment, Territorial Organization, Way of Life, Economic Base and Indigenous Communities and Traditional Populations), which together seek to portray all aspects involved in the fragility of the area. The technique was applied in the basin of the Coxim river in the State of Mato Grosso do Sul, assuming that there is interest or the possibility of installing hydropower plants within its boundaries. The basin was divided into three sub areas, considering physical parameters (such as topography, rainfall and hydrology), which were ranked by calculating the fragility of each one of the social-environmental indicators. As a result, a map was created to indicate the sub areas more susceptible to damage and those which should be more resistant to the installation of impacting activities, such as hydropower plants. The use of Geographic Information Systems (GIS) and the work of a multidisciplinary team can reduce the degree of subjectivity of the methodology and allow, (by modifying some considerations inherent in the partial calculations,) its application in other situations where the possibility of installing hydropower projects is not considered. (author)

  5. The La Grande hydroelectric development - James Bay, Quebec

    Energy Technology Data Exchange (ETDEWEB)

    Pare, J-J.; Levay, J.

    1997-10-01

    An historical overview of the James Bay Hydroelectric Power Development in northern Quebec was provided. The account touches upon the foundation of the Societe d`energie de la Baie James, a wholly-owned subsidiary of Hydro-Quebec. It describes the La Grande Complex, and provides a brief summary of the site investigation, the geological and geotechnical considerations, the rock excavation, the construction of embankments and dikes, and nature of the bedrock and overburden foundations. Some of the more interesting problems that arose during the construction such as the settling of the crest in the protective islands surrounding the instruments at some of the dam sites were outlined. Leakage under some of the La Grande 3 low head dikes near the end of the reservoir filling period and the degradation of some of the riprap protection of the Phase One embankments were also described. The solutions designed to overcome these problems were also part of the account of this major mega development project that promoted Quebec into the ranks of the major hydro energy producers in North America. 11 refs., 2 tabs., 3 figs., photos.

  6. Success factors for the hydroelectric power plants reformation: engineering and work planning; Fatores de sucesso para reforma de usinas hidreletricas. Engenharia e planejamento das obras

    Energy Technology Data Exchange (ETDEWEB)

    Nakamura, George; Amaral, Luiz Antonio Franco do; Campos, Jose Ayres de; Campos, Maria Tereza F.R. de [CNEC Engenharia S.A., Sao Paulo, SP (Brazil)]. E-mail: jayres@cnec.com.br

    2000-07-01

    The detailed description of the interventions in the power plant involving the diagnosis, project, specifications, acquisition, prior assembly, units shutdown, remounting, tests, operation, etc, based on data bases an solid information, are vital factors for the success of the reformation work of hydroelectric power plants. The main activities to be developed are: implantation integrated through the project interfaces management; characterization of critical path of the works; description and characterization of the power plant intervention stages. This paper generically describes this technology, based on the CNEC engineering company studies on hydroelectric power plants reformation.

  7. STUDY OF ECONOMIC AND FINANCIAL VIABILITY OF A CENTRAL GENERATING HYDROELECTRIC (CGH

    Directory of Open Access Journals (Sweden)

    Bruno Santos Lopes Candido

    2012-11-01

    Full Text Available The article discusses the evaluation of a Central Hydroelectric Generator (CGH, as an investment. The objective is to project the cash flow of the project and evaluate outcomes to ensure important information for decision-making through technical analysis of investment projects. The work begins with literature on the subject and subsequent case study. To develop this study was carried out data collection on construction and identification of key variables related to energy market in Brazil. Later techniques were used for evaluating investment projects, regarding their financial feasibility. An interview with a business sector, and research and consulting firms. The result was positive and showed that the project is a viable investment thus adding value to shareholders compared to other investment alternatives in the financial market.

  8. Simulation of the transient processes of load rejection under different accident conditions in a hydroelectric generating set

    Science.gov (United States)

    Guo, W. C.; Yang, J. D.; Chen, J. P.; Peng, Z. Y.; Zhang, Y.; Chen, C. C.

    2016-11-01

    Load rejection test is one of the essential tests that carried out before the hydroelectric generating set is put into operation formally. The test aims at inspecting the rationality of the design of the water diversion and power generation system of hydropower station, reliability of the equipment of generating set and the dynamic characteristics of hydroturbine governing system. Proceeding from different accident conditions of hydroelectric generating set, this paper presents the transient processes of load rejection corresponding to different accident conditions, and elaborates the characteristics of different types of load rejection. Then the numerical simulation method of different types of load rejection is established. An engineering project is calculated to verify the validity of the method. Finally, based on the numerical simulation results, the relationship among the different types of load rejection and their functions on the design of hydropower station and the operation of load rejection test are pointed out. The results indicate that: The load rejection caused by the accident within the hydroelectric generating set is realized by emergency distributing valve, and it is the basis of the optimization for the closing law of guide vane and the calculation of regulation and guarantee. The load rejection caused by the accident outside the hydroelectric generating set is realized by the governor. It is the most efficient measure to inspect the dynamic characteristics of hydro-turbine governing system, and its closure rate of guide vane set in the governor depends on the optimization result in the former type load rejection.

  9. Analysis of environmental issues related to small-scale hydroelectric development. III. Water level fluctuation

    Energy Technology Data Exchange (ETDEWEB)

    Hildebrand, S.G. (ed.)

    1980-10-01

    Potential environmental impacts in reservoirs and downstream river reaches below dams that may be caused by the water level fluctuation resulting from development and operation of small scale (under 25MW) hydroelectric projects are identified. The impacts discussed will be of potential concern at only those small-scale hydroelectric projects that are operated in a store and release (peaking) mode. Potential impacts on physical and chemical characteristics in reservoirs resulting from water level fluctuation include resuspension and redistribution of bank and bed sediment; leaching of soluble organic matter from sediment in the littoral zone; and changes in water quality resulting from changes in sediment and nutrient trap efficiency. Potential impacts on reservoir biota as a result of water level fluctuation include habitat destruction and the resulting partial or total loss of aquatic species; changes in habitat quality, which result in reduced standing crop and production of aquatic biota; and possible shifts in species diversity. The potential physical effects of water level fluctuation on downstream systems below dams are streambed and bank erosion and water quality problems related to resuspension and redistribution of these materials. Potential biological impacts of water level fluctuation on downstream systems below dams result from changes in current velocity, habitat reduction, and alteration in food supply. These alterations, either singly or in combination, can adversely affect aquatic populations below dams. The nature and potential significance of adverse impacts resulting from water level fluctuation are discussed. Recommendations for site-specific evaluation of water level fluctuation at small-scale hydroelectric projects are presented.

  10. THE RELEVANCE OF PUBLIC PARTICIPATION IN SOCIAL ENVIRONMENTAL ASSESSMENT PROCEDURES: ACASE STUDY - HYDROELECTRIC TUCURUÍ

    Directory of Open Access Journals (Sweden)

    Luiz Claudio Gonçalves

    2015-03-01

    Full Text Available The process of public participation in decision-making in a national social environmental, is not properly systematized, has some shortcomings and misconceptions needing so adjustments allowing for its correct operation and application.This article, through a literature review discusses the major foundations and approaches to support effective public participation in social environmental assessment processes. Methodologically, this study was also based on a case performed in Hydroelectric Tucuruí, which made use of semi-structured interviews with technicians and staff work, aimed at collecting information about the effective participation of civil society in decision-making in various stages of this project

  11. Bakun/Malaysia: Energy supply assurance on the basis of hydroelectric power generation. Bakun/Malaysia: Energiesicherung durch Wasserkraft

    Energy Technology Data Exchange (ETDEWEB)

    1988-01-01

    The project agreement 'hydro electric scheme Sarawak' made on 1st December 1979 between the Federal German Government and the Malaysian Government expires at the end of the year. The project aim of this collaboration which has existed for more than nine years consisted in the entire planning to exploit the hydroelectric potential in Sarawak. The working results range from the general inspection of the electricity supply via detail studies to the documents concerning the calls for tenders. All planning results necessary for a technically feasible and economically meaningful decision to utilize the hydro-electric potential in Sarawak which is justifiable as far as the effects on the environment are concerned, will be presented to the Malaysian government as a recommendation.

  12. Flow-Induced Pulsation and Vibration in Hydroelectric Machinery Engineer’s Guidebook for Planning, Design and Troubleshooting

    CERN Document Server

    Dörfler, Peter; Coutu, André

    2013-01-01

    Since the 1970’s, an increasing amount of specialized research has focused on the problems created by instability of internal flow in hydroelectric power plants. However, progress in this field is hampered by the inter­disciplinary nature of the subject, between fluid mechanics, structural mechanics and hydraulic transients. Flow-induced Pulsation and Vibration in Hydroelectric Machinery provides a compact guidebook explaining the many different underlying physical mechanisms and their possible effects.   Typical phenomena are described to assist in the proper diagnosis of problems and various key strategies for solution are compared and considered with support from practical experience and real-life examples. The link between state-of the-art CFD computation and notorious practical problems is discussed  and quantitative data is provided on  normal levels of vibration and pulsation so realistic limits can be set for future projects. Current projects are also addressed as the possibilities and limitatio...

  13. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 2. Pacific Southwest region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The estimates of existing, incremental, and the undeveloped hydropower potential for all states in the various regions of the country are presented. In the Pacific Southwest region, the maximum physical potential for all sites exceeds 33,000 MW of capacity with an estimated average annual energy greater than 85,000 GWH. By comparison, these values represent about 6% of the total potential capacity and hydroelectric energy generation estimated for the entire US. Of the total capacity estimated for the region, 9900 MW has been installed. The remainder (23,200 MW) is the maximum which could be developed by upgrading and expanding existing projects (6000 MW) and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (17,200 MW). Small-scale facilities account for less than 4% of the region's total installed capacity, but another 600 MW could be added to these and other small water resource projects. In addition, 600 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of California and Utah having the largest potential for incremental development at existing projects in the Pacific Southwest region. States comprising the Southwest are Arizona, California, Hawaii, Nevada, and Utah.

  14. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 6. Northeast region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    In the Northeast region, the physical potential for all sites exceeds 33,000 MW of capacity with an estimated average annual energy of some 153,000 GWH. By comparison, the available data represent about 6% of the total capacity and 11% of the hydroelectric energy potential estimated for the entire US. Of the total capacity estimated for the region, 6100 MW has been installed. The remainder (27,200 MW, excluding the undeveloped capacity in the New England States) is the maximum which could be developed by upgrading and expanding existing projects (18,700 MW), and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (8500 MW). Small-scale facilities account for about 15% of the region's total installed capacity, but another 1800 MW could be added to these and other small water-resource projects. In addition, 500 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of New York, Maine, and New Hampshire having the largest potential for incremental development at existing projects in the Northeast region. West Virginia, Maryland, Delaware, New Jersey, Pennsylvania, New York, Connecticut, Massachusetts, Rhode Island, New Hampshire, Vermont, and Maine comprise the Northeast region.

  15. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 5. Southeast region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    In the Southeast region, the maximum physical potential for all sites exceeds 48,000 MW with an estimated average annual energy of more than 137,000 GWH. By comparison, these values represent about 9% of both the total potential capacity and hydroelectric energy estimated for the entire US. Of the total capacity estimated for the region, 11,800 MW has been installed. The remainder (36,200 MW) is the maximum which could be developed by upgrading and expanding existing projects (13,000 MW), and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (23,200 MW). Small-scale facilities account for some 2% of the region's total installed capacity, but another 700 MW could be added to these and other small water-resource projects. In addition, 1100 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of North Carolina and South Carolina having the largest potential for incremental development at existing projects in the Southeast region. The Southeast region is composed of Arkansas, Louisiana, Mississippi, Tennessee, Alabama, Georgia, Florida, South Carolina, North Carolina, and Virginia.

  16. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 4. Lake Central region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The estimates of existing, incremental and the undeveloped hydropower potential for all states in the various regions of the country are presented. In the Lake Central region, the maximum physical potential for all sites exceeds 26,000 MW with an estimated average annual energy of more than 75,000 GWH. By comparison, these values represent about 5% of both the total potential capacity and hydroelectric energy estimated for the entire US. Of the total capacity estimated for the region, 2600 MW has been installed. The remainder (23,600 MW) is the maximum which could be developed by upgrading and expanding existing projects (15,800 MW), and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (7800 MW). Small-scale facilities account for some 24% of the region's total installed capacity, but another 900 MW could be added to these and other small water-resource projects. In addition, 900 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of Michigan and Wisconsin having the largest potential for incremental development at existing projects in the Lake Central region. This Lake Central region is composed of Minnesota, Wisconsin, Michigan, Ohio, Indiana, Illinois, Kentucky, Missouri, and Iowa.

  17. Analysis of Environmental Issues Related to Small-Scale Hydroelectric Development IV: Fish Mortality Resulting From Turbine Passage

    Energy Technology Data Exchange (ETDEWEB)

    Turbak, Susan C. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Reichle, Donna R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Shriner, Carole R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    1981-01-01

    The purpose of this report is to provide summary information for use by potential developers and regulators of small-scale hydroelectric projects (defined as existing dams that can be retrofitted to a total site capacity of ≤30 MW), where turbine-related mortality of fish is a potential issue affecting site-specific development. Mitigation techniques for turbine-related mortality are not covered in this report.

  18. Widespread Forest Vertebrate Extinctions Induced by a Mega Hydroelectric Dam in Lowland Amazonia.

    Science.gov (United States)

    Benchimol, Maíra; Peres, Carlos A

    2015-01-01

    Mega hydropower projects in tropical forests pose a major emergent threat to terrestrial and freshwater biodiversity worldwide. Despite the unprecedented number of existing, under-construction and planned hydroelectric dams in lowland tropical forests, long-term effects on biodiversity have yet to be evaluated. We examine how medium and large-bodied assemblages of terrestrial and arboreal vertebrates (including 35 mammal, bird and tortoise species) responded to the drastic 26-year post-isolation history of archipelagic alteration in landscape structure and habitat quality in a major hydroelectric reservoir of Central Amazonia. The Balbina Hydroelectric Dam inundated 3,129 km2 of primary forests, simultaneously isolating 3,546 land-bridge islands. We conducted intensive biodiversity surveys at 37 of those islands and three adjacent continuous forests using a combination of four survey techniques, and detected strong forest habitat area effects in explaining patterns of vertebrate extinction. Beyond clear area effects, edge-mediated surface fire disturbance was the most important additional driver of species loss, particularly in islands smaller than 10 ha. Based on species-area models, we predict that only 0.7% of all islands now harbor a species-rich vertebrate assemblage consisting of ≥80% of all species. We highlight the colossal erosion in vertebrate diversity driven by a man-made dam and show that the biodiversity impacts of mega dams in lowland tropical forest regions have been severely overlooked. The geopolitical strategy to deploy many more large hydropower infrastructure projects in regions like lowland Amazonia should be urgently reassessed, and we strongly advise that long-term biodiversity impacts should be explicitly included in pre-approval environmental impact assessments.

  19. Southcentral Alaska small hydroelectric projects, reconnaissance phase: Planning aid report

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Planning Aid Report is based on information gathered from: (1) Kings River, (2) Tonsina River Tributary, (3) Placer River, (4) Bear Creek, and (5) Windy River....

  20. Feasibility study on the demonstrative test on the hybrid mini hydroelectric power generation technology. 2; Hybrid gata mini suiryoku hatsuden gijutsu ni kakawaru jissho shiken kanosei chosa. 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    A study was made for the purpose of electrification of unelectrified zones of the mountainous areas in developing countries using extremely small hydroelectric power facilities. The target for this project is a development of a micro hydroelectric power system with a size of about 5kW, which is estimated regarding that 1 village has 80 houses and each house needs electricity of 60W. In the study, the low-head system using a weir of irrigation channels in Subang pref. of West Java state was selected by the evaluation of access, stability of flow rate, natural conditions, etc. The hydroelectric power plant is of a flow-in method in which water is taken from the left bank and is injected/discharged to the downstream of the left bank. As the hybrid complementary power source, hybrid battery with a two-hour charging time at peak and a capacity of 3.5kWh was considered. When estimating the construction cost of the hybrid micro hydroelectric power system and equalizing by durable years, the operational cost per kW is 15 times higher than the benefits which local people receive. It was judged to be difficult to say that the micro hydroelectric power system is economically feasible. It was predicted that the financial profit during the demonstrative test is good, according to a trial calculation of income from power rates and the operational cost. 18 refs., 90 figs., 53 tabs.

  1. [Hygienic characteristics of work conditions at large Hydroelectric Power Plants with mechanization and automatization].

    Science.gov (United States)

    Iakimova, L D

    1997-01-01

    The article touches upon hygienic problems associated with mechanization and automation of major hydroelectric power stations. The authors present criteria to evaluate work conditions of the main occupations participating in the technologic process of hydroelectric power stations.

  2. University-Company Cooperation in a Hydroelectric Plant: Cooperation Study in Environmental Management

    Directory of Open Access Journals (Sweden)

    Fabricio Mussi

    2017-05-01

    Full Text Available Hydroelectric power plants are considered strategic for the country when considering their relevance and impact on other sectors of the economy. However, the dynamics of the operation of a plant, its support structure and power generation activities can cause impacts on the environment, which must be constantly monitored in order to mitigate any environmental risks. The purpose of this study is to examine the partnership relations between a plant by menas of the creation of a department within the environmental management and universities and research institutes to identify specific partnerships in environmental management and hydroelectric plants. Six projects have been selected for analysis, four of them related to projects with universities and two related to cooperation with research institutes. The focus of the analysis was restricted to the main points observed in the management of these partnerships, which are: (a motivation for establishing partnerships, (b the composition of the estimated costs for implementing these partnerships, (c the difficulties of reconciling technical management and financial management, and (d the measurement of results and contributions from these interactions. Administrative practices of management of partnerships were also analyzed in the stages preceding cooperation for cooperation and further cooperation. Although other such studies are needed to strengthen the findings presented, one can conclude that the purposes of the establishment of cooperation in environmental management differ from those observed in other fields of knowledge such as engineering and biotechnology, for example.

  3. Fall Protection Introduction, #33462

    Energy Technology Data Exchange (ETDEWEB)

    Chochoms, Michael [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-06-23

    The proper use of fall prevention and fall protection controls can reduce the risk of deaths and injuries caused by falls. This course, Fall Protection Introduction (#33462), is designed as an introduction to various types of recognized fall prevention and fall protection systems at Los Alamos National Laboratory (LANL), including guardrail systems, safety net systems, fall restraint systems, and fall arrest systems. Special emphasis is given to the components, inspection, care, and storage of personal fall arrest systems (PFASs). This course also presents controls for falling object hazards and emergency planning considerations for persons who have fallen.

  4. 1997 Fall West Coast NOAA/USGS/NASA Airborne LiDAR Assessment of Coastal Erosion (ALACE) Project for the US Coastline

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set includes data collected in the fall of 1997 and covers the states of California, Oregon, and Washington. Collection was done prior to expected El Nino...

  5. 1998 Fall East Coast NOAA/USGS/NASA Airborne LiDAR Assessment of Coastal Erosion (ALACE) Project for the US Coastline

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set includes data collected in the fall of 1998 and covers the states of South Carolina, North Carolina, and Virginia. Laser beach mapping uses a pulsed...

  6. 1998 Fall Gulf Coast NOAA/USGS/NASA Airborne LiDAR Assessment of Coastal Erosion (ALACE) Project for the US Coastline

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set includes data collected during Fall 1998 and covers coastlines of the states of Louisiana, Mississippi, Alabama, and Florida. Laser beach mapping uses...

  7. 2000 Fall East Coast NOAA/USGS/NASA Airborne LiDAR Assessment of Coastal Erosion (ALACE) Project for the US Coastline

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set includes data collected during Fall 2000 and covers coastlines of the states of Maryland, New Jersey, New York, Connecticut, Rhode Island,...

  8. Fall 1999 East Coast NOAA/USGS/NASA Airborne LiDAR Assessment of Coastal Erosion (ALACE) Project for the US Coastline

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set includes data collected in the fall of 1999 and coastlines of the states of Florida, Georgia, North Carolina, and New York. Laser beach mapping uses a...

  9. Current Status and Future Prospects of Hydroelectricity Standardization

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    Technical standardization is very essential to electricity industry, which plays an active role in many aspects including technology standardization, secure and economic operation of power systems, environment protection, technological progress, and improvement of enterprises' management. This paper introduces the current status of hydroelectricity standardization, summarizes the progress and achievements, and then points out the development direction and working target in the future.

  10. Current Status and Future Prospects of Hydroelectricity Standardization

    Institute of Scientific and Technical Information of China (English)

    Liu Yongdong

    2010-01-01

    @@ Technical standardization is very essential to electricity industry, which plays an active role in many aspects including technology standardization, secure and economic operation of power systems, environment protection, technological progress, and improvement of enterprises' management. This paper introduces the current status of hydroelectricity standardization, summarizes the progress and achievements, and then points out the development direction and working target in the future.

  11. Spawning Habitat Studies of Hanford Reach Fall Chinook Salmon (Oncorhynchus tshawytscha), Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Geist, David R.; Arntzen, Evan V.; Chien, Yi-Ju (Pacific Northwest National Laboratory)

    2009-03-02

    The Pacific Northwest National Laboratory conducted this study for the Bonneville Power Administration (BPA) with funding provided through the Northwest Power and Conservation Council(a) and the BPA Fish and Wildlife Program. The study was conducted in the Hanford Reach of the Columbia River. The goal of study was to determine the physical habitat factors necessary to define the redd capacity of fall Chinook salmon that spawn in large mainstem rivers like the Hanford Reach and Snake River. The study was originally commissioned in FY 1994 and then recommissioned in FY 2000 through the Fish and Wildlife Program rolling review of the Columbia River Basin projects. The work described in this report covers the period from 1994 through 2004; however, the majority of the information comes from the last four years of the study (2000 through 2004). Results from the work conducted from 1994 to 2000 were covered in an earlier report. More than any other stock of Pacific salmon, fall Chinook salmon (Oncorhynchus tshawytscha) have suffered severe impacts from the hydroelectric development in the Columbia River Basin. Fall Chinook salmon rely heavily on mainstem habitats for all phases of their life cycle, and mainstem hydroelectric dams have inundated or blocked areas that were historically used for spawning and rearing. The natural flow pattern that existed in the historic period has been altered by the dams, which in turn have affected the physical and biological template upon which fall Chinook salmon depend upon for successful reproduction. Operation of the dams to produce power to meet short-term needs in electricity (termed power peaking) produces unnatural fluctuations in flow over a 24-hour cycle. These flow fluctuations alter the physical habitat and disrupt the cues that salmon use to select spawning sites, as well as strand fish in near-shore habitat that becomes dewatered. The quality of spawning gravels has been affected by dam construction, flood protection, and

  12. Proposed OPEG Namakan River hydro development project draft environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    The Ojibway Power and Energy Group (OPEG) is planning on installing a hydroelectric generating facility along the Namakan River at High Falls in Canada. In order the meet the different requirements in terms of environmental assessment for such a project, the group prepared an environmental report. The aim of this paper is to present the comments of the Quetico Foundation, a charity whose aim is to protect wilderness class parks. The foundation found both general and discipline-by-discipline deficiencies in OPEG's environmental report. All the deficiencies the Foundation observed are listed in this report, general deficiencies, and specific deficiencies concerning fisheries, terrestrial ecology, hydrology and socio-economic impacts. The Quetico Foundation demonstrated that a significant number of deficiencies are found in the OPEG environmental report, suggesting that they did not fully understand the potential long term impacts of their project and that further study should be undertaken.

  13. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 1995 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Martinson, Rick D.; Graves, Richie J.; Langeslay, Michael J. (Northwest and Alaska Fisheries Science Center, Environmental and Technical Services Division, Portland, OR)

    1996-12-01

    The seaward migration of juvenile salmonids was monitored by the National Marine Fisheries Service (NMFS) at Bonneville and John Day Dams on the Columbia river in 1995. The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program focuses on protecting, mitigating, and enhancing fish populations affected by the development and operation of hydroelectric power plants on the Columbia River. The purpose of the SMP is to monitor the migration of the juvenile salmonid stocks in the Columbia basin and make flow and spill recommendations designed to facilitate fish passage. Data are also used for travel time, migration timing, and relative run size analysis. The purpose of the NMFS portion of the program is to provide FPC with species and project specific real time data from John Day and Bonneville Dams.

  14. Mines as lower reservoir of an UPSH (Underground Pumping Storage Hydroelectricity): groundwater impacts and feasibility

    Science.gov (United States)

    Bodeux, Sarah; Pujades, Estanislao; Orban, Philippe; Dassargues, Alain

    2016-04-01

    The energy framework is currently characterized by an expanding use of renewable sources. However, their intermittence could not afford a stable production according to the energy demand. Pumped Storage Hydroelectricity (PSH) is an efficient possibility to store and release electricity according to the demand needs. Because of the topographic and environmental constraints of classical PSH, new potential suitable sites are rare in countries whose topography is weak or with a high population density. Nevertheless, an innovative alternative is to construct Underground Pumped Storage Hydroelectricity (UPSH) plants by using old underground mine works as lower reservoir. In that configuration, large amount of pumped or injected water in the underground cavities would impact the groundwater system. A representative UPSH facility is used to numerically determine the interactions with surrounding aquifers Different scenarios with varying parameters (hydrogeological and lower reservoir characteristics, boundaries conditions and pumping/injection time-sequence) are computed. Analysis of the computed piezometric heads around the reservoir allows assessing the magnitude of aquifer response and the required time to achieve a mean pseudo-steady state under cyclic solicitations. The efficiency of the plant is also evaluated taking the leakage into the cavity into account. Combining these two outcomes, some criterions are identified to assess the feasibility of this type of projects within potential old mine sites from a hydrogeological point of view.

  15. Falls and Older Adults

    Science.gov (United States)

    ... version of this page please turn Javascript on. Falls and Older Adults About Falls Risk Increases With Age Many people have a ... problems -- rises with age. Click for more information Falls Lead to Fractures, Trauma Each year, more than ...

  16. 75 FR 1587 - Medford-Park Falls Ranger District, Chequamegon-Nicolet National Forest, Park Falls Hardwoods...

    Science.gov (United States)

    2010-01-12

    ... Forest Service Medford-Park Falls Ranger District, Chequamegon-Nicolet National Forest, Park Falls... Statement. SUMMARY: The USDA Forest Service, Chequamegon-Nicolet National Forest, Medford-Park Falls Ranger... within the Park Falls Hardwoods project area. The primary purpose of this proposal is to...

  17. Feasibility of determination of low-head hydroelectric power development at existing sites. Big Blue River Co-dependent Hydroelectric Development: feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Wacker, H. Steve; Feuerberg, Stan; Lawrence, John D.; Pal, Parimal C.; Trick, Dr., William T.

    1979-03-01

    The technical, economic, environmental, safety, and financial aspects of redeveloping 7 dam sites in Nebraska for hydroelectric power generation were studied. The Big Blue River Co-dependent Hydroelectric Development was found to be a technically feasible concept, for both redevelopment and in some cases rehabilitation of seven existing sites. The proposed redevelopment project will include seven installations with a recommended nominally rated redeveloped capacity of 3920 kW ranging from 120 kW at the northernmost site in Seward County to 1500 kW at Barneston. The average annual gross generation expected from the seven redeveloped sites totals 11,555,000 kWh. It is estimated that the total cost of redevelopment of these seven sites will be $14,090,000 at 1979 price levels, providing power at an average levelized cost of about 5.3 cents per kWh based on 7% cost of money, a mid-1983 commissioning date, and allowing for funds during construction and cost escalation over a 30-year period. Rehabilitation of original installations at Crete, Dewitt, Blue Springs and Barneston is technically feasible for a total installed capacity of 1415 kW with annual average gross generation of 6,675,000 kWh. The total cost of this rehabilitation is estimated as $3,372,000 at 1979 price levels, or about 2.4 cents per kWh, levelized on a similar basis. Rehabilitation of the Barneston site alone for an installed capacity of 760 kW and annual generation of 3,581,000 kWh is both technically and economically feasible. The total estimated cost of this alternative is $668,000, providing power at a cost of about 1.9 cents per kWh at 1979 price levels. The benefit-cost ratio for Barneston rehabilitation is estimated as 1.23.

  18. 75 FR 39679 - AmerenUE; Notice of Authorization for Continued Project Operation

    Science.gov (United States)

    2010-07-12

    ..., 2010. On June 24, 2008, AmerenUE, licensee for the Taum Sauk Pumped Storage Hydroelectric Project... regulations thereunder. The Taum Sauk Pumped Storage Hydroelectric Project is on the East Fork Black River and... hereby given that AmerenUE is authorized to continue operation of the Taum Sauk Pumped Storage...

  19. Hydroelectric power drives a sports car; Wasserkraft treibt Sportwagen an

    Energy Technology Data Exchange (ETDEWEB)

    Grabotin, Norbert

    2009-07-01

    The first electrically powered sports car from Germany, the so-called eRUF Concept Model A 2008 has been proposed previously. The basic idea for this concept was initiated by Alois Ruf (Pfaffhausen, Federal Republic of Germany) in the form of a new vision of a simple energy transfer concept: His hydroelectric power plants feed 35 million kWh of electrical energy annually into the German energy network. These hydroelectric power plans also could drive modern cars more or less directly. The annually produced amount of electrical energy (35 million kWh) nearly is in accordance with that amount of electrical energy which enables a single car (eRUF, model A 2008) to drive 3,500 times around the globe. The author of this paper describes the prototype of this car.

  20. Cross currents : hydroelectricity and the engineering of northern Ontario

    Energy Technology Data Exchange (ETDEWEB)

    Manore, J.L. [Calgary Univ., AB (Canada)

    1999-05-01

    The history of hydroelectric development in northern Ontario was reviewed and analysed with special emphasis on the developments along the Mattagami and Abitibi Rivers. The objective was to examine the important factors that shaped modern hydroelectric development in Canada. System builders, the privately owned Nesbitt Thomson Company, the publicly owned Hydro Electric Power Corporation of Ontario and the eventual evolution of the single power system under Ontario Hydro are chronicled. Broad historical themes such as the technological impacts, regionalism, indigenous rights, plus environmental and economic issues are examined, in addition to an appreciation of the importance of electricity in the manufacturing sector of Ontario, the impact of hydroelectric development on the northern environment and on the northern First Nations, who rely on rivers for their subsistence. Until fairly recently, government policies and interpretations of law often excluded the recognition of Aboriginal uses of river systems, thereby limiting First Nations` peoples ability to practice traditional ways of life. In essence, the book is an account of how the northeastern power system in Ontario shaped the social, political and natural environments and how the development of northeastern power sources by southern power developers shaped the regional interactions between Ontario`s north and south. refs., figs.

  1. Conceptual Spawning Habitat Model to Aid in ESA Recovery Plans for Snake River Fall Chinook Salmon, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Geist, David (Pacific Northwest National Laboratory)

    2005-09-01

    The goal of this project is to develop a spawning habitat model that can be used to determine the physical habitat factors that are necessary to define the production potential for fall chinook salmon that spawn in large mainstem rivers like the Columbia River's Hanford Reach and Snake River. This project addresses RPA 155 in the NMFS 2000 Biological Opinion: Action 155: BPA, working with BOR, the Corps, EPA, and USGS, shall develop a program to: (1) Identify mainstem habitat sampling reaches, survey conditions, describe cause-and-effect relationships, and identify research needs; (2) Develop improvement plans for all mainstem reaches; and (3) Initiate improvements in three mainstem reaches. During FY 2003 we continued to collect and analyze information on fall chinook salmon spawning habitat characteristics in the Hanford Reach that will be used to address RPA 155, i.e., items 1-3 above. For example, in FY 2003: (1) We continued to survey spawning habitat in the Hanford Reach and develop a 2-dimensional hydraulic and habitat model that will be capable of predicting suitability of fall chinook salmon habitat in the Hanford Reach; (2) Monitor how hydro operations altered the physical and chemical characteristics of the river and the hyporheic zone within fall chinook salmon spawning areas in the Hanford Reach; (3) Published a paper on the impacts of the Columbia River hydroelectric system on main-stem habitats of fall chinook salmon (Dauble et al. 2003). This paper was made possible with data collected on this project; (4) Continued to analyze data collected in previous years that will ultimately be used to identify cause-and-effect relationships and identify research needs that will assist managers in the improvement of fall chinook habitat quality in main-stem reaches. During FY 2004 we plan to: (1) Complete preliminary reporting and submit papers based on the results of the project through FY 2004. Although we have proposed additional analysis of data be

  2. CFD Simulation of a fall accident of a fuel element in pool This project aims at calculating the speed ratio of impact-fall height for a PWR fuel element falling freely in the fuel pool; Simulacion CFD de un accidente de caida de un elemento combustible en piscina

    Energy Technology Data Exchange (ETDEWEB)

    Montoro Garcia, B.; Corpa Masa, R.; Jimenez-Reja, C.

    2014-07-01

    It is intended to provide a methodology of analysis more realistic this accident.que referred to in calculations of the license that requires fuel catastrophic break regardless of the height of the fall, with the consequent release of inventory analysers. Accidents that occurred in the past indicate that this hypothesis could be too conservative. (Author)

  3. Wildlife and Wildlife Habitat Loss Assessment Summary at Federal Hydroelectric Facilities; Willamette River Basin, 1985 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Noyes, J.H.

    1986-02-01

    Habitat based assessments were conducted of the US Army Corps of Engineers' hydroelectric projects in the Willamette River Basin, Oregon, to determine losses or gains to wildlife and/or wildlife habitat resulting from the development and operation of the hydroelectric-related components of the facilities. Preconstruction, postconstruction, and recent vegetation cover types at the project sites were mapped based on aerial photographs. Vegetation cover types were identified within the affected areas and acreages of each type at each period were determined. Wildlife target species were selected to represent a cross-section of species groups affected by the projects. An interagency team evaluated the suitability of the habitat to support the target species at each project for each time period. An evaluation procedure which accounted for both the quantity and quality of habitat was used to aid in assessing impacts resulting from the projects. The Willamette projects extensively altered or affected 33,407 acres of land and river in the McKenzie, Middle Fork Willamette, and Santiam river drainages. Impacts to wildlife centered around the loss of 5184 acres of old-growth conifer forest, and 2850 acres of riparian hardwood and shrub cover types. Impacts resulting from the Willamette projects included the loss of critical winter range for black-tailed deer and Roosevelt elk, and the loss of year-round habitat for deer, upland game birds, furbearers, spotted owls, pileated woodpeckers, and many other wildlife species. Bald eagles and ospreys were benefited by an increase in foraging habitat. The potential of the affected areas to support wildlife was greatly altered as a result of the Willamette projects. Losses or gains in the potential of the habitat to support wildlife will exist over the lives of the projects. Cumulative or system-wide impacts of the Willamette projects were not quantitatively assessed.

  4. Hydroelectric Optimized System Sensitivity to Climate

    Science.gov (United States)

    Howard, J. C.; Howard, C. D.

    2009-12-01

    This paper compares the response of a large hydro system, globally optimized for daily operations, under a range of reservoir system inflows. The modeled system consists of Projects and hydro operating constraints on the South Saskatchewan River, Lake Winnipeg, Southern Indian Lake, Churchill Diversion, Red River, Winnipeg River, and the Nelson River. The river system is continental in scale, stretching from the Rocky Mountains to Hudson Bay. The hydro storage is large enough to operate with a two year cycle, which includes freezeup conditions. The objective is to maximize seasonal value of energy generation over a two year time horizon. Linear and quadratic constraints represent reservoir stage-storage curves, tailwater stage-discharge curves, transient river routing, and seasonally dependent environmental constraints on operations. This paper describes the optimization modeling approaches used to represent an actual physical system and to accommodate uncertainties in the historical datasets used for calibration. The results are hypothetical, not a forecast.

  5. An estimation of the capacity to produce hydrogen by wasted hydroelectric energy for the three largest Brazilian hydroelectric

    Energy Technology Data Exchange (ETDEWEB)

    Padilha, Janine C.; Trindade, Leticia G. da; Souza, Roberto F. de [Universidade Federal do Rio Grande do Sul (UFRGS), Porto Alegre, RS (Brazil). Inst. of Chemistry], Email: janine@iq.ufrgs.br; Miguel, Marcelo [Itaipu Binacional, Foz do Iguacu, PR (Brazil)

    2010-07-01

    The use of water wasted in hydroelectric plants as normalization dam excess, which constitute a hydrodynamic potential useful to generate electric energy which can be subsequently used to produce hydrogen and its subsequent consumption in fuel cells has been considered as an alternative for hydraulic energy-rich countries like Brazil. The case is examined in which all the water wasted in the hydroelectric plants, spilled by dam gates to maintain acceptable water levels, from the 3 largest Brazilian hydroelectric plants was used to produce hydrogen. During the year of 2008, the electric energy produced from this utilization would have been equivalent to 52.8 TWh, an amount that corresponds to an increase of ca. 15% of the total electric energy produced in the country. Furthermore, if this amount of hydrogen was used in the replacement of internal combustion vehicles by fuel cells, this would have prevented the production of 2.26 x 10{sup 7} ton of Co{sub 2} per year. This plan would also significantly decrease production and release of greenhouse gases. (author)

  6. 75 FR 61772 - Meeting of the Paterson Great Falls National Historical Park Advisory Commission

    Science.gov (United States)

    2010-10-06

    ... National Park Service Meeting of the Paterson Great Falls National Historical Park Advisory Commission... of the meeting of the Paterson Great Falls National Historical Park Advisory Commission. DATES: The.... FOR FURTHER INFORMATION CONTACT: Bill Bolger, Project Director, Paterson Great Falls...

  7. Cost basis for hydroelectric power plants. Price level of 01.01.1995; Kostnadsgrunnlag for vannkraftanlegg. Prisnivaa pr 01.01.1995

    Energy Technology Data Exchange (ETDEWEB)

    Stensby, H.; Slapgaard, J.

    1995-08-01

    This publication provides a basis for calculation of expected average construction costs and equipment costs for large hydroelectric power plants in Norway. The publication is not intended to be a tool for projecting with regard to optimization or choice of construction types, but should be useful at an early stage of planning. There is a supplementary publication (Publication no. 20/1995) for small plants. 80 figs., 12 tabs.

  8. Assessment of the feasibility of recommissioning the French Landing Hydroelectric Facility in Van Buren Township, Michigan. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1979-02-01

    The results of a study of the feasibility of recommissioning a small, low-head hydroelectric facility in southeastern Michigan are presented. The study concludes that there are several cost-effective designs for recommissioning the site, based on the use of vertical turbines and the sale of power to nearby industrial markets. In terms of the bulk sale of power to the local electric utility, no cost-effective alternatives were found to exist. A major burden on project cost-effectiveness was found to be the relatively large costs for structural repairs to the dam and powerhouse needed to insure safe operation and on adequate service life. From an engineering standpoint it was found that the items of equipment needed to recommission the site are readily available from both US and foreign manufacturers. A variety of hydraulic turbine designs could be successfully adapted to the existing powerhouse, without extensive new construction. It was determined that the production capacity of the facility had an important influence on the cost-effectiveness of the project. A detailed benefit/cost analysis was conducted to identify the optimum facility size in terms of incremental costs and revenues. A detailed environmental assessment using an impact matrix methodology concluded that the development of the facility for hydroelectric generation would have important positive environmental consequences related to improved impoundment and flow management techniques as well as enhanced public safety due to structural repairs to the dam. The institutional and regulatory implications of developing the site for hydroelectric generation were found to be significant but manageable.

  9. Falls in Parkinson's disease.

    NARCIS (Netherlands)

    Grimbergen, Y.A.M.; Munneke, M.; Bloem, B.R.

    2004-01-01

    PURPOSE OF REVIEW: To summarize the latest insights into the clinical significance, assessment, pathophysiology and treatment of falls in Parkinson's disease. RECENT FINDINGS: Recent studies have shown that falls are common in Parkinson's disease, even when compared with other fall-prone populations

  10. First Aid: Falls

    Science.gov (United States)

    ... Your 1- to 2-Year-Old First Aid: Falls KidsHealth > For Parents > First Aid: Falls Print A A A en español Folleto de instructiones: Caídas (Falls) With all the running, climbing, and exploring kids ...

  11. Study on safety operation for large hydroelectric generator unit

    Science.gov (United States)

    Yan, Z. G.; Cui, T.; Zhou, L. J.; Zhi, F. L.; Wang, Z. W.

    2012-11-01

    Hydroelectric generator unit is a complex mechanical system which is composed of hydraulic turbine and electric generator. Rotary system is supported by the bearing bracket and the reinforced concrete structures, and vibration problem can't be avoided in the process of operating. Many large-scale hydroelectric units have been damaged because of the vibration problem in recent years. As the increase of the hydraulic turbine unit capacity and water head, the safe operation of hydraulic turbine has become a focus research in many countries. The operating characteristics of the hydraulic turbine have obvious differences at different working conditions. Based on the combination of field measurement and theoretical calculation, this paper shows a deep research on the safe operation of a large-scale Francis turbine unit. Firstly, the measurements of vibration, swing, pressure fluctuation and noise were carried out at 4 different heads. And also the relationships between vibrations and pressure fluctuations at different heads and working conditions were analysed deeply. Then the scientific prediction of safe operation for the unit at high head were done based on the CFD numerical calculation. Finally, this paper shows the division of the operating zone for the hydroelectric unit. According to the experimental results (vibrations, swings, pressure fluctuations and noise) as well as the theoretical results, the operating zone of the unit has been divided into three sections: prohibited operating zone, transition operating zone and safe operating zone. After this research was applied in the hydropower station, the security and economic efficiency of unit increased greatly, and enormous economic benefits and social benefits have been obtained.

  12. Turbulence at Hydroelectric Power Plants and its Potential Effects on Fish.

    Energy Technology Data Exchange (ETDEWEB)

    Cada, Glenn F.; Odeh, Mufeed

    2001-01-01

    The fundamental influence of fluid dynamics on aquatic organisms is receiving increasing attention among aquatic ecologists. For example, the importance of turbulence to ocean plankton has long been a subject of investigation (Peters and Redondo 1997). More recently, studies have begun to emerge that explicitly consider the effects of shear and turbulence on freshwater invertebrates (Statzner et al. 1988; Hart et al. 1996) and fishes (Pavlov et al. 1994, 1995). Hydraulic shear stress and turbulence are interdependent natural fluid phenomena that are important to fish, and consequently it is important to develop an understanding of how fish sense, react to, and perhaps utilize these phenomena under normal river flows. The appropriate reaction to turbulence may promote movement of migratory fish or prevent displacement of resident fish. It has been suggested that one of the adverse effects of flow regulation by hydroelectric projects is the reduction of normal turbulence, particularly in the headwaters of reservoirs, which can lead to disorientation and slowing of migration (Williams et al. 1996; Coutant et al. 1997; Coutant 1998). On the other hand, greatly elevated levels of shear and turbulence may be injurious to fish; injuries can range from removal of the mucous layer on the body surface to descaling to torn opercula, popped eyes, and decapitation (Neitzel et al. 2000a,b). Damaging levels of fluid stress can occur in a variety of circumstances in both natural and man-made environments. This paper discusses the effects of shear stress and turbulence on fish, with an emphasis on potentially damaging levels in man-made environments. It defines these phenomena, describes studies that have been conducted to understand their effects, and identifies gaps in our knowledge. In particular, this report reviews the available information on the levels of turbulence that can occur within hydroelectric power plants, and the associated biological effects. The final section

  13. Proliferation of hydroelectric dams in the Andean Amazon and implications for Andes-Amazon connectivity.

    Directory of Open Access Journals (Sweden)

    Matt Finer

    Full Text Available Due to rising energy demands and abundant untapped potential, hydropower projects are rapidly increasing in the Neotropics. This is especially true in the wet and rugged Andean Amazon, where regional governments are prioritizing new hydroelectric dams as the centerpiece of long-term energy plans. However, the current planning for hydropower lacks adequate regional and basin-scale assessment of potential ecological impacts. This lack of strategic planning is particularly problematic given the intimate link between the Andes and Amazonian flood plain, together one of the most species rich zones on Earth. We examined the potential ecological impacts, in terms of river connectivity and forest loss, of the planned proliferation of hydroelectric dams across all Andean tributaries of the Amazon River. Considering data on the full portfolios of existing and planned dams, along with data on roads and transmission line systems, we developed a new conceptual framework to estimate the relative impacts of all planned dams. There are plans for 151 new dams greater than 2 MW over the next 20 years, more than a 300% increase. These dams would include five of the six major Andean tributaries of the Amazon. Our ecological impact analysis classified 47% of the potential new dams as high impact and just 19% as low impact. Sixty percent of the dams would cause the first major break in connectivity between protected Andean headwaters and the lowland Amazon. More than 80% would drive deforestation due to new roads, transmission lines, or inundation. We conclude with a discussion of three major policy implications of these findings. 1 There is a critical need for further strategic regional and basin scale evaluation of dams. 2 There is an urgent need for a strategic plan to maintain Andes-Amazon connectivity. 3 Reconsideration of hydropower as a low-impact energy source in the Neotropics.

  14. An Adaptive Multivariable Control System for Hydroelectric Generating Units

    Directory of Open Access Journals (Sweden)

    Gunne J. Hegglid

    1983-04-01

    Full Text Available This paper describes an adaptive multivariable control system for hydroelectric generating units. The system is based on a detailed mathematical model of the synchronous generator, the water turbine, the exiter system and turbine control servo. The models of the water penstock and the connected power system are static. These assumptions are not considered crucial. The system uses a Kalman filter for optimal estimation of the state variables and the parameters of the electric grid equivalent. The multivariable control law is computed from a Riccatti equation and is made adaptive to the generators running condition by means of a least square technique.

  15. 77 FR 24949 - Red River Lock & Dam No. 4 Hydroelectric Project; BOST4 Hydroelectric LLC; Notice of Proposed...

    Science.gov (United States)

    2012-04-26

    ... Department Dr. Linda Langley, Coushatta of Culture, Recreation & Tourism, P.O. Tribe of Louisiana, P.O. Box... Tomlinson or Louisiana Department of Culture, Representative, U.S. Army Recreation & Tourism, P.O. Box 44247... historic properties, including traditional cultural properties. If historic properties are...

  16. Framework of systematic sustainability assessment strategy (FSSAS) for hydroelectric power industry in Malaysia

    Science.gov (United States)

    Johan, Kartina; Turan, Faiz Mohd

    2017-08-01

    Hydroelectric power is an alternative power resource in Malaysia and always associated with negative impact on environmental, social and economy of the surrounding site. The dispute over environmental, societal and economic issues can be minimised if compliance to sustainability development requirement is included in the project as part of the project premises during planning phase. This paper suggests a framework targeted for decision-makers in charge of implementing the projects to produce hydropower the sustainable way in Malaysian context which can mitigate the risks in social, environment and economy. The framework is strategic in nature and based on project management methodology with objective to provide a ‘common language’ by having a project value as measureable for stakeholders to state their mutual agreement of what a sustainable hydropower project in the context of Malaysia and in line with the United Nations (UN) 17 Sustainable Development Goals (SDGs). The paper discusses how the proposed systematic sustainability assessment strategy (FSSAS) framework support the call for Malaysia to promote meaningful public participation in ensuring land and natural resource decisions and to address citizens’ interests which is the core idea of Environmental Democracy Index established in 2014. The paper argues that, even though it is at present impossible to define precision status of sustainability development with respect to the nature of the multi stakeholders and the lack of systematic assessment the proposed FSSAS framework can be a valuable tool because it tracks the project value as a quantitative deliverable to determine the status of the journey in sustainable development towards accomplishing the SDG under a consensus in hydropower industry of any scale over time.

  17. Effects of dam removal on Tule Fall Chinook salmon spawning habitat in the White Salmon River, Washington

    Science.gov (United States)

    Hatten, James R.; Batt, Thomas R.; Skalicky, Joseph J.; Engle, Rod; Barton, Gary J.; Fosness, Ryan L.; Warren, Joe

    2016-01-01

    Condit Dam is one of the largest hydroelectric dams ever removed in the USA. Breached in a single explosive event in October 2011, hundreds-of-thousands of cubic metres of sediment washed down the White Salmon River onto spawning grounds of a threatened species, Columbia River tule fall Chinook salmon Oncorhynchus tshawytscha. We investigated over a 3-year period (2010–2012) how dam breaching affected channel morphology, river hydraulics, sediment composition and tule fall Chinook salmon (hereafter ‘tule salmon’) spawning habitat in the lower 1.7 km of the White Salmon River (project area). As expected, dam breaching dramatically affected channel morphology and spawning habitat due to a large load of sediment released from Northwestern Lake. Forty-two per cent of the project area that was previously covered in water was converted into islands or new shoreline, while a large pool near the mouth filled with sediments and a delta formed at the mouth. A two-dimensional hydrodynamic model revealed that pool area decreased 68.7% in the project area, while glides and riffles increased 659% and 530%, respectively. A spatially explicit habitat model found the mean probability of spawning habitat increased 46.2% after dam breaching due to an increase in glides and riffles. Shifting channels and bank instability continue to negatively affect some spawning habitat as sediments continue to wash downstream from former Northwestern Lake, but 300 m of new spawning habitat (river kilometre 0.6 to 0.9) that formed immediately post-breach has persisted into 2015. Less than 10% of tule salmon have spawned upstream of the former dam site to date, but the run sizes appear healthy and stable. Published 2015. This article is a U.S. Government work and is in the public domain in the USA.

  18. Hydro-Electric Facilities, (Municpality Name) Hydro-electric Facility, Published in 2005, 1:24000 (1in=2000ft) scale, Lafayette County Land Records.

    Data.gov (United States)

    NSGIC GIS Inventory (aka Ramona) — This Hydro-Electric Facilities dataset, published at 1:24000 (1in=2000ft) scale, was produced all or in part from Field Observation information as of 2005. It is...

  19. Factors influencing the recession rate of Niagara Falls since the 19th century

    OpenAIRE

    Hayakawa, Yuichi S.; Matsukura, Yukinori

    2009-01-01

    The rate of recession of Niagara Falls (Horseshoe and American Falls) in northeastern North America has been documented since the 19th century; it shows a decreasing trend from ca. 1 m y− 1 a century ago to ca. 0.1 m y− 1 at present. Reduction of the flow volume in the Niagara River due to diversion into bypassing hydroelectric schemes has often been taken to be the factor responsible, but other factors such as changes in the waterfall shape could play a role and call for a quantitative study...

  20. Energy harvesting from hydroelectric systems for remote sensors

    Directory of Open Access Journals (Sweden)

    Joaquim Azevedo

    2016-10-01

    Full Text Available Hydroelectric systems are well-known for large scale power generation. However, there are virtually no studies on energy harvesting with these systems to produce tens or hundreds of milliwatts. The goal of this work was to study which design parameters from large-scale systems can be applied to small-scale systems. Two types of hydro turbines were evaluated. The first one was a Pelton turbine which is suitable for high heads and low flow rates. The second one was a propeller turbine used for low heads and high flow rates. Several turbine geometries and nozzle diameters were tested for the Pelton system. For the propeller, a three-bladed turbine was tested for different heads and draft tubes. The mechanical power provided by these turbines was measured to evaluate the range of efficiencies of these systems. A small three-phase generator was developed for coupling with the turbines in order to evaluate the generated electric power. Selected turbines were used to test battery charging with hydroelectric systems and a comparison between several efficiencies of the systems was made.

  1. Downstream effects of a hydroelectric reservoir on aquatic plant assemblages.

    Science.gov (United States)

    Bernez, Ivan; Haury, Jacques; Ferreira, Maria Teresa

    2002-03-16

    Macrophytes were studied downstream of the Rophémel hydroelectric dam on the River Rance (Côtes d'Armor Department, western France) to assess the effects of hydroelectric functioning on river macrophyte communities. We studied ten representative sections of the hydro-peaking channel on five occasions in 1995 and 1996, on a 15-km stretch of river. Floristic surveys were carried out on sections 50 m in length, and genera of macroalgae, species of bryophyta, hydrophytes, and emergent rhizophytes were identified. For the aquatic bryophytes and spermatophytes section of our study, we compared our results with 19th century floristic surveys, before the dam was built. During the vegetative growth period, the hydro-peaking frequency was low. The plant richness was highest near the dam. The macrophyte communities were highly modified according to the distance to the dam. The frequency and magnitude of hydro-peaking was related to the aquatic macrophyte richness in an Intermediate Disturbance Hypothesis position. However, the results of the eco-historical comparison with 19th century floristic surveys point to the original nature of the flora found at the site. Some floral patterns, seen during both periods and at an interval of 133 years, were indicative of the ubiquity of the aquatic flora and of the plants" adaptability. This demonstrates the importance of taking river basin history into account in such biological surveys.

  2. Downstream Effects of a Hydroelectric Reservoir on Aquatic Plant Assemblages

    Directory of Open Access Journals (Sweden)

    Ivan Bernez

    2002-01-01

    Full Text Available Macrophytes were studied downstream of the Rophémel hydroelectric dam on the River Rance (Côtes d’Armor Department, western France to assess the effects of hydroelectric functioning on river macrophyte communities. We studied ten representative sections of the hydro-peaking channel on five occasions in 1995 and 1996, on a 15-km stretch of river. Floristic surveys were carried out on sections 50 m in length, and genera of macroalgae, species of bryophyta, hydrophytes, and emergent rhizophytes were identified. For the aquatic bryophytes and spermatophytes section of our study, we compared our results with 19th century floristic surveys, before the dam was built. During the vegetative growth period, the hydro-peaking frequency was low. The plant richness was highest near the dam. The macrophyte communities were highly modified according to the distance to the dam. The frequency and magnitude of hydro-peaking was related to the aquatic macrophyte richness in an Intermediate Disturbance Hypothesis position. However, the results of the eco-historical comparison with 19th century floristic surveys point to the original nature of the flora found at the site. Some floral patterns, seen during both periods and at an interval of 133 years, were indicative of the ubiquity of the aquatic flora and of the plants’ adaptability. This demonstrates the importance of taking river basin history into account in such biological surveys.

  3. Mercury accumulation in bats near hydroelectric reservoirs in Peninsular Malaysia.

    Science.gov (United States)

    Syaripuddin, Khairunnisa; Kumar, Anjali; Sing, Kong-Wah; Halim, Muhammad-Rasul Abdullah; Nursyereen, Muhammad-Nasir; Wilson, John-James

    2014-09-01

    In large man-made reservoirs such as those resulting from hydroelectric dam construction, bacteria transform the relatively harmless inorganic mercury naturally present in soil and the submerged plant matter into toxic methylmercury. Methylmercury then enters food webs and can accumulate in organisms at higher trophic levels. Bats feeding on insects emerging from aquatic systems can show accumulation of mercury consumed through their insect prey. In this study, we investigated whether the concentration of mercury in the fur of insectivorous bat species was significantly higher than that in the fur of frugivorous bat species, sampled near hydroelectric reservoirs in Peninsular Malaysia. Bats were sampled at Temenggor Lake and Kenyir Lake and fur samples from the most abundant genera of the two feeding guilds-insectivorous (Hipposideros and Rhinolophus) and frugivorous (Cynopterus and Megaerops) were collected for mercury analysis. We found significantly higher concentrations of total mercury in the fur of insectivorous bats. Mercury concentrations also differed significantly between insectivorous bats sampled at the two sites, with bats from Kenyir Lake, the younger reservoir, showing higher mercury concentrations, and between the insectivorous genera, with Hipposideros bats showing higher mercury concentrations. Ten bats (H. cf. larvatus) sampled at Kenyir Lake had mercury concentrations approaching or exceeding 10 mg/kg, which is the threshold at which detrimental effects occur in humans, bats and mice.

  4. Analysis of environmental issues related to small-scale hydroelectric development. VI. Dissolved oxygen concentrations below operating dams

    Energy Technology Data Exchange (ETDEWEB)

    Cada, G.F.; Kumar, K.D.; Solomon, J.A.; Hildebrand, S.G.

    1982-01-01

    Results are presented of an effort aimed at determining whether or not water quality degradation, as exemplified by dissolved oxygen concentrations, is a potentially significant issue affecting small-scale hydropower development in the US. The approach was to pair operating hydroelectric sites of all sizes with dissolved oxygen measurements from nearby downstream US Geological Survey water quality stations (acquired from the WATSTORE data base). The USGS data were used to calculate probabilities of non-compliance (PNCs), i.e., the probabilities that dissolved oxygen concentrations in the discharge waters of operating hydroelectric dams will drop below 5 mg/l. PNCs were estimated for each site, season (summer vs remaining months), and capacity category (less than or equal to 30 MW vs >30 MW). Because of the low numbers of usable sites in many states, much of the subsequent analysis was conducted on a regional basis. During the winter months (November through June) all regions had low mean PNCs regardless of capacity. Most regions had higher mean PNCs in summer than in winter, and summer PNCs were greater for large-scale than for small-scale sites. Among regions, the highest mean summer PNCs were found in the Great Basin, the Southeast, and the Ohio Valley. To obtain a more comprehensive picture of the effects of season and capacity on potential dissolved oxygen problems, cumulative probability distributions of PNC were developed for selected regions. This analysis indicates that low dissolved oxygen concentrations in the tailwaters below operating hydroelectric projects are a problem largely confined to large-scale facilities.

  5. Analysis of environmental issues related to small scale hydroelectric development. II. Design considerations for passing fish upstream around dams. Environmental Sciences Division Publication No. 1567

    Energy Technology Data Exchange (ETDEWEB)

    Hildebrand, S.G. (ed.)

    1980-08-01

    The possible requirement of facilities to move migrating fish upstream around dams may be a factor in determining the feasibility of retrofitting small dams for hydroelectric generation. Basic design considerations are reported that should be evaluated on a site-specific basis if upstream fish passage facilities are being considered for a small scale hydroelectric project (defined as an existing dam that can be retrofitted to generate 25 MW or less). Information on general life history and geographic distribution of fish species that may require passage is presented. Biological factors important in the design of upstream passage facilities are discussed: gas bubble disease, fish swimming speed, oxygen consumption by fish, and diel and photo behavior. Three general types of facilities (fishways, fish locks, and fish lifts) appropriate for upstream fish passage at small scale hydroelectric projects are described, and size dimensions are presented. General design criteria for these facilities (including fish swimming ability and behavior) and general location of facilities at a site are discussed. Basic cost considerations for each type of passage facility, including unit cost, operation and maintenance costs, and costs for supplying attraction water, are indicated.

  6. 77 FR 23239 - Bryant Mountain, LLC; Notice of Additional Scoping Meetings, Extension of Time To File Comments...

    Science.gov (United States)

    2012-04-18

    ... Mountain Pumped Storage Hydroelectric Project held March 13 and 14, 2012, in Malin and Klamath Falls... Project: Bryant Mountain Pumped Storage Hydroelectric Project. g. Location: Near Malin in Klamath County... project name (Bryant Mountain Pumped Storage Hydroelectric Project) and the project number (P-13680-001...

  7. The Patient Who Falls

    Science.gov (United States)

    Tinetti, Mary E.; Kumar, Chandrika

    2013-01-01

    Falls are common health events that cause discomfort and disability for older adults and stress for caregivers. Using the case of an older man who has experienced multiple falls and a hip fracture, this article, which focuses on community-living older adults, addresses the consequences and etiology of falls; summarizes the evidence on predisposing factors and effective interventions; and discusses how to translate this evidence into patient care. Previous falls; strength, gait, and balance impairments; and medications are the strongest risk factors for falling. Effective single interventions include exercise and physical therapy, cataract surgery, and medication reduction. Evidence suggests that the most effective strategy for reducing the rate of falling in community-living older adults may be intervening on multiple risk factors. Vitamin D has the strongest clinical trial evidence of benefit for preventing fractures among older men at risk. Issues involved in incorporating these evidence-based fall prevention interventions into outpatient practice are discussed, as are the trade-offs inherent in managing older patients at risk of falling. While challenges and barriers exist, fall prevention strategies can be incorporated into clinical practice. PMID:20085954

  8. Hydroacoustic modelling and numerical simulation of unsteady operation of hydroelectric systems[Dissertation 3713

    Energy Technology Data Exchange (ETDEWEB)

    Nicolet, Ch.

    2007-03-15

    presented. The model provides the RSI pressure fluctuation patterns in the vaneless gap and enables to predict standing waves in the spiral case and adduction pipe. The proposed one-dimensional modelling approach enables the simulation, analysis and optimization of the dynamic behavior of hydroelectric power plants. The approach has proven its capability of simulating properly both transient and periodic phenomena. Such investigations can be undertaken at early stages of a project to assess the possible dynamic problems and to select appropriate solutions ensuring the safest and optimal operation of the facility. (author)

  9. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 1. Pacific Northwest region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The preliminary inventory and analysis procedures provide a comprehensive assessment of the undeveloped hydroelectric power potential in the US and determines which sites merit more thorough investigation. Over 5400 existing structures have been identified as having the physical potential to add hydropower plants or increase hydropower output thereby increasing our present hydropower capacity from a total of 64,000 MW to 158,000 MW and our energy from 280,000 GWH to 503,000 GWH. While the physical potential for this increase is clearly available, some of these projects will undoubtedly not satisfy more-detailed economic analysis as well as the institutional and environmental criteria which will be imposed upon them. Summary tables include estimates of the potential capacity and energy at each site in the inventory. In some cases, individual projects may be site alternatives to others in the same general location, when only one can be considered for hydropower development. The number of sites per state is identified, but specific information is included for only the sites in Alaska, Idaho, Oregon, and Washington in this first volume.

  10. Internship Progress Summary: Fall 2016

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, Ralph S. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Valencia, Matthew John [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-12-13

    This fall I had the opportunity to work at Los Alamos National Laboratory for the Technology Applications engineering group. I assisted two main projects during my appointment, both related to the Lab’s mission statement: “To solve national security challenges through scientific excellence.” My first project, a thermal source transfer unit, involved skills such as mechanical design, heat transfer simulation, and design analysis. The goal was to create a container that could protect a heat source and regulate its temperature during transit. I generated several designs, performed heat transfer simulations, and chose a design for prototyping. The second project was a soil drying unit for use in post blast sample analysis. To ensure fast and accurate sample processing, agents in the field wanted a system that could process wet dirt and turn it into dry powder. We designed a system of commercially available parts, and we tested the systems to determine the best methods and processes.

  11. Benchmarking of Advanced Control Strategies for a Simulated Hydroelectric System

    Science.gov (United States)

    Finotti, S.; Simani, S.; Alvisi, S.; Venturini, M.

    2017-01-01

    This paper analyses and develops the design of advanced control strategies for a typical hydroelectric plant during unsteady conditions, performed in the Matlab and Simulink environments. The hydraulic system consists of a high water head and a long penstock with upstream and downstream surge tanks, and is equipped with a Francis turbine. The nonlinear characteristics of hydraulic turbine and the inelastic water hammer effects were considered to calculate and simulate the hydraulic transients. With reference to the control solutions addressed in this work, the proposed methodologies rely on data-driven and model-based approaches applied to the system under monitoring. Extensive simulations and comparisons serve to determine the best solution for the development of the most effective, robust and reliable control tool when applied to the considered hydraulic system.

  12. Greenhouse gas emissions from Brazil’s Amazonian hydroelectric dams

    Science.gov (United States)

    Fearnside, Philip M.

    2016-01-01

    Tropical dams are often falsely portrayed as ‘clean’ emissions-free energy sources. The letter by de Faria et al (2015 Environ. Res. Lett. 10 124019) adds to evidence questioning this myth. Calculations are made for 18 dams that are planned or under construction in Brazilian Amazonia and show that emissions from storage hydroelectric dams would exceed those from electricity generation based on fossil fuels. Fossil fuels need not be the alternative, because Brazil has vast potential for wind and solar power as well as opportunities for energy conservation. Because dam-building is rapidly shifting to humid tropical areas, where emissions are higher than in other climatic zones, the impact of these emissions needs to be given proper weight in energy-policy decisions.

  13. Hourly rounding and patient falls: what factors boost success?

    Science.gov (United States)

    Goldsack, Jennifer; Bergey, Meredith; Mascioli, Susan; Cunningham, Janet

    2015-02-01

    Falls are a persistent problem in all healthcare settings, with rates in acute care hospitals ranging from 1.3 to 8.9 falls per 1,000 inpatient days, about 30% resulting in serious injury. A 30-day prospective pilot study was conducted on two units with pre- and postimplementation evaluation to determine the impact of patient-centered proactive hourly rounding on patient falls as part of a Lean Six Sigma process improvement project. Nurse leaders and a staff champion from Unit 1 were involved in the process from the start of the implementation period, while Unit 2 was introduced to the project for training shortly before the intervention began. On Unit 1, where staff and leadership were engaged in the project from the outset, the 1-year baseline mean fall rate was 3.9 falls/1,000 patient days. The pilot period fall rate of 1.3 falls/1,000 patient days was significantly lower than the baseline fall rate (P = 0.006). On Unit 2, where there was no run-in period, the 1-year baseline mean fall rate was 2.6 falls/1,000 patient days, which fell, but not significantly, to 2.5 falls/1,000 patient days during the pilot period (P = 0.799). Engaging an interdisciplinary team, including leadership and unit champions, to complete a Lean Six Sigma process improvement project and implement a patient-centered proactive hourly rounding program was associated with a significant reduction in the fall rate in Unit 1. Implementation of the same program in Unit 2 without engaging leadership or front-line staff in program design did not impact its fall rate. The active involvement of leadership and front-line staff in program design and as unit champions during the project run-in period was critical to significantly reducing inpatient fall rates and call bell use in an adult medical unit.

  14. Fall Leaf Portraits

    Science.gov (United States)

    O'Hara, Cristina

    2012-01-01

    In this article, the author describes how students can create a stunning as well as economical mosaic utilizing fall's brilliantly colored leaves, preserved at their peak in color. Start by choosing a beautiful fall day to take students on a nature walk to collect a variety of leaves in different shapes, sizes, and colors. Focus on collecting a…

  15. Falls and comorbidity

    DEFF Research Database (Denmark)

    Jørgensen, Terese Sara Høj; Hansen, Annette Højmann; Sahlberg, Marie

    2014-01-01

    AIMS: To compare nationwide time trends and mortality in hip and proximal humeral fractures; to explore associations between incidences of falls risk related comorbidities (FRICs) and incidence of fractures. METHODS: The study is a retrospective cohort study using nationwide Danish administrative....... CONCLUSIONS: The results suggest that the overall reduction in fractures can be explained by reduction in falls related comorbidity....

  16. Woodruff Narrows low head hydroelectric power plant feasibility determination

    Energy Technology Data Exchange (ETDEWEB)

    1979-03-01

    Woodruff Narrows Reservoir, owned by the State of Utah, was built in 1961 as an irrigation reservoir. The reservoir outlet works and spillway are in need of repair, and plans have been made to enlarge the reservoir from its present capacity of 28,000 acre-feet to 53,200 acre-feet when these repairs are made. The purpose of this study was to determine if it is feasible to add hydropower facilities when the reservoir is repaired and enlarged. A computer simulation model based on mean monthly values, utilizing 26 years of recorded streamflow into the reservoir, was used to determine the mean annual energy potential for the following configurations: (1) present dam, (2) the proposed enlarged dam, (3) a new dam at the lower site with a maximum head of 65 feet, and (4) a new dam at the lower site which would store water to the same elevation as the proposed enlarged dam. Results of the simulation study show that maximum power capacities are respectively 2.1, 3.0, 3.9, and 4.5 megawatts. The marketing potential for this electric power, cost estimates and financial analysis, and environmental, social, and regulatory aspects of the proposed hydropower facilities were evaluated. The results showed the addition of hydroelectric power development at the Woodruff Narrows site would have minimal social and environmental effects on the area, would result in little or no changes in the present patterns of water and land use, income, population, and employment and would not result in any significant changes of the social structure or characteristics of the area. However, hydroelectric power development at the Woodruff Narrows site is not economically feasible at the present time. (LCL)

  17. Fall prevention conceptual framework.

    Science.gov (United States)

    Abraham, Sam

    2011-01-01

    Falls can have lasting psychological and physical consequences, particularly fractures and slow-healing processes, and patients may also lose confidence in walking. Injuries from falls lead to functional decline, institutionalization, higher health care costs, and decreased quality of life. The process related to the problem of patient falls in the hospital, using the nursing model developed by the theorist, Ida Jean Orlando, is explained in this article. The useful tool that provides guidance to marketers in this endeavor is Maslow's hierarchy of needs. During acute illness, individuals are greatly in need of satisfying their physiological needs. If these needs are not met, patients leave the hospital lacking a positive experience. Initial fall risk assessment is critical to plan intervention and individualize care plan. Interventions depend on the severity of fall risk factors.

  18. Mathematical modeling of vibrations in turbogenerator sets of Sayano-Shushenskaya Hydroelectric Power Station

    Science.gov (United States)

    Leonov, G. A.; Kuznetsov, N. V.; Solovyeva, E. P.

    2016-02-01

    Oscillations in turbogenerator sets, which consist of a synchronous generator, a hydraulic turbine, and an automatic speed regulator, are investigated. This study was motivated by the emergency that took place at the Sayano-Shushenskaya Hydroelectric Power Station in 2009. During modeling of the parameters of turbogenerator sets of the Sayano-Shushenskaya Hydroelectric Power Station, the ranges corresponding to undesired oscillation regimes were determined. These ranges agree with the results of the full-scale tests of the hydropower units of the Sayano-Shushenskaya Hydroelectric Power Station performed in 1988.

  19. Legal obstacles and incentives to the development of small scale hydroelectric power in New Jersey

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in New Jersey are described. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is discussed. New Jersey follows the riparian theory of water law. Following an extensive discussion of the New Jersey water law, New Jersey regulatory law and financial considerations regarding hydroelectric power development are discussed.

  20. Spawning Habitat Studies of Hanford Reach Fall Chinook Salmon (Oncorhynchus tshawytscha), Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Geist, David R.; Arntzen, Evan V.; Chien, Yi-Ju (Pacific Northwest National Laboratory)

    2009-03-02

    The Pacific Northwest National Laboratory conducted this study for the Bonneville Power Administration (BPA) with funding provided through the Northwest Power and Conservation Council(a) and the BPA Fish and Wildlife Program. The study was conducted in the Hanford Reach of the Columbia River. The goal of study was to determine the physical habitat factors necessary to define the redd capacity of fall Chinook salmon that spawn in large mainstem rivers like the Hanford Reach and Snake River. The study was originally commissioned in FY 1994 and then recommissioned in FY 2000 through the Fish and Wildlife Program rolling review of the Columbia River Basin projects. The work described in this report covers the period from 1994 through 2004; however, the majority of the information comes from the last four years of the study (2000 through 2004). Results from the work conducted from 1994 to 2000 were covered in an earlier report. More than any other stock of Pacific salmon, fall Chinook salmon (Oncorhynchus tshawytscha) have suffered severe impacts from the hydroelectric development in the Columbia River Basin. Fall Chinook salmon rely heavily on mainstem habitats for all phases of their life cycle, and mainstem hydroelectric dams have inundated or blocked areas that were historically used for spawning and rearing. The natural flow pattern that existed in the historic period has been altered by the dams, which in turn have affected the physical and biological template upon which fall Chinook salmon depend upon for successful reproduction. Operation of the dams to produce power to meet short-term needs in electricity (termed power peaking) produces unnatural fluctuations in flow over a 24-hour cycle. These flow fluctuations alter the physical habitat and disrupt the cues that salmon use to select spawning sites, as well as strand fish in near-shore habitat that becomes dewatered. The quality of spawning gravels has been affected by dam construction, flood protection, and

  1. Tailored prevention of inpatient falls: development and usability testing of the fall TIPS toolkit.

    Science.gov (United States)

    Zuyev, Lyubov; Benoit, Angela N; Chang, Frank Y; Dykes, Patricia C

    2011-02-01

    Patient falls and fall-related injuries are serious problems in hospitals. The Fall TIPS application aims to prevent patient falls by translating routine nursing fall risk assessment into a decision support intervention that communicates fall risk status and creates a tailored evidence-based plan of care that is accessible to the care team, patients, and family members. In our design and implementation of the Fall TIPS toolkit, we used the Spiral Software Development Life Cycle model. Three output tools available to be generated from the toolkit are bed poster, plan of care, and patient education handout. A preliminary design of the application was based on initial requirements defined by project leaders and informed by focus groups with end users. Preliminary design partially simulated the paper version of the Morse Fall Scale currently used in hospitals involved in the research study. Strengths and weaknesses of the first prototype were identified by heuristic evaluation. Usability testing was performed at sites where research study is implemented. Suggestions mentioned by end users participating in usability studies were either directly incorporated into the toolkit and output tools, were slightly modified, or will be addressed during training. The next step is implementation of the fall prevention toolkit on the pilot testing units.

  2. Small scale hydroelectric power potential in Nevada: a preliminary reconnaissance survey

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, G.F.; Fordham, J.W.; Richard, K.; Loux, R.

    1981-04-01

    This preliminary reconnaissance survey is intended to: develop a first estimate as to the potential number, location and characteristics of small-scale (50 kW to 15 MW) hydroelectric sites in Nevada; provide a compilation of various Federal and state laws and regulations, including tax and financing regulations, that affect small-scale hydroelectric development and provide information on sources of small-scale hydroelectric generation hardware and consultants/ contractors who do small scale hydroelectric work. The entire survey has been conducted in the office working with various available data bases. The site survey and site evaluation methods used are described, and data are tabulated on the flow, power potential, predicted capital expenditures required, etc. for 61 potential sites with measured flows and for 77 sites with derived flows. A map showing potential site locations is included. (LCL)

  3. Feasibility study: hydroelectric generating potential, Newcastle and Charlo fish hatcheries for Department of Fisheries and Oceans

    National Research Council Canada - National Science Library

    1984-01-01

    ADI Limited were retained in March 1984 to carry out a feasibility study of potential hydroelectric generation at the Newcastle and Charlo hatchery sites, in accordance with their proposal submitted...

  4. Reducing falls in a care home

    Science.gov (United States)

    Cooper, Rosie

    2017-01-01

    Care home residents are 3 times more likely to fall than their community dwelling peers and 10 times more likely to sustain a significant injury as a result. 2 A project commenced at a care home in Aberdeen with the aim of reducing the number of falls by 20% by 30st April 2016 using the model for improvement. Qualitative data was gathered to establish staff belief about falls and their level of knowledge& understanding about falls risks and how to manage these. This informed the training which was delivered and iterative testing commenced with the introduction of the Lanarkshire Falls Risk/Intervention tool – where the multifactorial nature of a resident's falls risks are explored and specific actions to manage these are identified and implemented. Failure to meet PDSA predictions about sharing risk reducing actions with staff and length of time to complete the tool prompted a focus on communication and the processes whereby the tool is completed. “Teach back” was employed to highlight communication difficulties and ultimately the introduction of Huddles out improved the flow of information about residents and informed the Falls Risk/Intervention tool. 5 PDSAs were completed and within them multiple tests of change. The improvement shift came following a root cause analysis of the nature & cause of one resident's falls and applying the tool & communication processes. The average falls rate fell from 49 per 1000 occupied bed days to 23.6 and was sustained because of the attention to the importance of communication. The aim was achieved with a 36.6% reduction in Falls rate. Care home residents are 3 times more likely to fall than their community dwelling peers and 10 times more likely to sustain a significant injury as a result. 2 A project commenced at a care home in Aberdeen with the aim of reducing the number of falls by 20% by 30th April 2016 using the model for improvement. Qualitative data was gathered to establish staff belief about falls and their level

  5. Seneca Falls. Classroom Focus.

    Science.gov (United States)

    Balantic, Jeannette; Libresco, Andrea S.

    1995-01-01

    Presents a secondary school lesson based on the Seneca Falls Declaration of Sentiments. Provides lesson objectives and step-by-step instructional procedures. Includes quoted sections of the Declaration of Sentiments. (CFR)

  6. How does interference fall?

    CERN Document Server

    Orlando, Patrick J; Modi, Kavan

    2016-01-01

    We study how single- and double-slit interference patterns fall in the presence of gravity. First, we demonstrate that universality of free fall still holds in this case, i.e., interference patterns fall just like classical objects. Next, we explore lowest order relativistic effects in the Newtonian regime by employing a recent quantum formalism which treats mass as an operator. This leads to interactions between non-degenerate internal degrees of freedom (like spin in an external magnetic field) and external degrees of freedom (like position). Based on these effects, we present an unusual phenomenon, in which a falling double slit interference pattern periodically decoheres and recoheres. The oscillations in the visibility of this interference occur due to correlations built up between spin and position. Finally, we connect the interference visibility revivals with non-Markovian quantum dynamics.

  7. Fall Bottom Trawl Survey

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The standardized NEFSC Fall Bottom Trawl Survey was initiated in 1963 and covered an area from Hudson Canyon, NY to Nova Scotia, Canada. Throughout the years,...

  8. Editors' Fall Picks

    Science.gov (United States)

    Hoffert, Barbara; Heilbrun, Margaret; Kuzyk, Raya; Kim, Ann; McCormack, Heather; Katterjohn, Anna; Burns, Ann; Williams, Wilda

    2008-01-01

    From the fall's cascade of great new books, "Library Journal's" editors select their favorites--a dark rendition of Afghan life, a look at the "self-esteem trap," a celebration of Brooklyn activism, and much more.

  9. Hydroelectricity, land use and water managing; Hidroelectricidad, uso del suelo y manejo del agua

    Energy Technology Data Exchange (ETDEWEB)

    Gutierrez Canet, Lourdes [Proyectos Geotermoelectricos, Aplica, S. A., Mexico, D. F. (Mexico)

    1997-12-31

    This document deals with the importance of determining the vocation of the geographic site where it is pretended to execute a hydroelectric project, since it is necessary to asses various alternative sites, in order to select the most appropriate, where the environmental impacts be less, without forgetting for a minute the ecological criteria for its final selection. Unfortunately there are not environmental studies of periodic continuation departing from the commissioning of a dam, since this studies would permit to know the real environmental impacts in order to solve them later [Espanol] Este documento trata la importancia de determinar la vocacion del lugar geografico donde se pretende llevar a cabo un proyecto hidroelectrico, ya que es necesario evaluar diversos lugares alternativos, con objeto de elegir el mejor, donde los impactos ambientales sean menores, sin olvidar en ningun momento los criterios ecologicos para su eleccion definitiva. Lamentablemente no hay estudios ambientales de seguimiento periodicos a partir de que una presa se encuentre en operacion, ya que estos estudios permitirian conocer realmente los impactos ambientales para poder solucionarlos posteriormente

  10. Development of an HTS hydroelectric power generator for the hirschaid power station

    Science.gov (United States)

    Fair, Ruben; Lewis, Clive; Eugene, Joseph; Ingles, Martin

    2010-06-01

    This paper describes the development and manufacture of a 1.7MW, 5.25kV, 28pole, 214rpm hydroelectric power generator consisting of superconducting HTS field coils and a conventional stator. The generator is to be installed at a hydro power station in Hirschaid, Germany and is intended to be a technology demonstrator for the practical application of superconducting technology for sustainable and renewable power generation. The generator is intended to replace and uprate an existing conventional generator and will be connected directly to the German grid. The HTS field winding uses Bi-2223 tape conductor cooled to about 30K using high pressure helium gas which is transferred from static cryocoolers to the rotor via a bespoke rotating coupling. The coils are insulated with multi-layer insulation and positioned over laminated iron rotor poles which are at room temperature. The rotor is enclosed within a vacuum chamber and the complete assembly rotates at 214rpm. The challenges have been significant but have allowed Converteam to develop key technology building blocks which can be applied to future HTS related projects. The design challenges, electromagnetic, mechanical and thermal tests and results are presented and discussed together with applied solutions.

  11. Development of an HTS hydroelectric power generator for the hirschaid power station

    Energy Technology Data Exchange (ETDEWEB)

    Fair, Ruben; Lewis, Clive; Eugene, Joseph; Ingles, Martin, E-mail: ruben.fair@converteam.co [Advanced Technology Group, Converteam, Rugby, CV21 1BD (United Kingdom)

    2010-06-01

    This paper describes the development and manufacture of a 1.7MW, 5.25kV, 28pole, 214rpm hydroelectric power generator consisting of superconducting HTS field coils and a conventional stator. The generator is to be installed at a hydro power station in Hirschaid, Germany and is intended to be a technology demonstrator for the practical application of superconducting technology for sustainable and renewable power generation. The generator is intended to replace and uprate an existing conventional generator and will be connected directly to the German grid. The HTS field winding uses Bi-2223 tape conductor cooled to about 30K using high pressure helium gas which is transferred from static cryocoolers to the rotor via a bespoke rotating coupling. The coils are insulated with multi-layer insulation and positioned over laminated iron rotor poles which are at room temperature. The rotor is enclosed within a vacuum chamber and the complete assembly rotates at 214rpm. The challenges have been significant but have allowed Converteam to develop key technology building blocks which can be applied to future HTS related projects. The design challenges, electromagnetic, mechanical and thermal tests and results are presented and discussed together with applied solutions.

  12. Feasibility determination of hydroelectric power generation at Patillas Reservoir, Puerto Rico. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Huetter, J.J. Jr.

    1979-02-01

    The overall feasibility of retrofit for hydroelectric power generation at the Patillas Reservoir, an existing impoundment located near the town of Patillas, Puerto Rico, was studied. The scope of work and project intent is limited to establishing valid acceptance or non-acceptance criteria for this specific site as an example of power generation potential at existing dams of relatively low head (less than or equal to 20 m) in the United States. Information is included on hydrologic conditions at the site, retrofit plant design, economic analysis, environmental, legal, social and institutional aspects, and availability of plant equipment. It is concluded that generation of hydropower at Patillas is entirely practical and uncomplicated from an engineering viewpoint, has no adverse environmental effects and is economically justifiable for the island of Puerto Rico. The final agency or contractor roles for development are reasonably well-established. There are no prohibitory laws or regulations concerning this development. In fact, according to Puerto Rico legislation, such hydropower developments appear to be mandated. The installed capacity of the site ranges from 665 kW to approximately 1500 kW depending on extent of development of the available options. (LCL)

  13. Small-scale hydroelectric power in the southeast: new impetus for an old energy source

    Energy Technology Data Exchange (ETDEWEB)

    1980-06-01

    The Southeastern conference, Small-Scale Hydroelectric Power: New Impetus for an Old Energy Source, was convened to provide a forum for state legislators and other interested persons to discuss the problems facing small-scale hydro developers, and to recommend appropriate solutions to resolve those problems. During the two-day meeting state legislators and their staffs, along with dam developers, utility and industry representatives, environmentalists and federal/state officials examined and discussed the problems impeding small-scale hydro development at the state level. Based upon the problem-oriented discussions, alternative policy options were recommended for consideration by the US Department of Energy, state legislatures and the staff of the National Conference of State Legislatures (NCSL). Emphasis was placed on the legal, institutional, environmental and economic barriers at the state level, as well as the federal delays associated with licensing small-scale hydro projects. Whereas other previously held conferences have emphasized the identification and technology of small-scale hydro as an alternative energy source, this conference stressed legislative resolution of the problems and delays in small-scale hydro licensing and development. Panel discussions and workshops are summarized. Papers on the environmental, economic, and legal aspects of small-scale hydropower development are presented. (LCL)

  14. Behind an ambitious megaproject in Asia: The history and implications of the Bakun hydroelectric dam in Borneo

    Energy Technology Data Exchange (ETDEWEB)

    Sovacool, Benjamin K., E-mail: bsovacool@nus.edu.sg [Lee Kuan Yew School of Public Policy, National University of Singapore, Oei Tiong Ham Building, 469C Bukit Timah Road, Singapore 259772 (Singapore); Bulan, L.C. [Lee Kuan Yew School of Public Policy, National University of Singapore, Oei Tiong Ham Building, 469C Bukit Timah Road, Singapore 259772 (Singapore)

    2011-09-15

    Using a case-study, inductive, narrative approach, this article explores the history, drivers, benefits, and barriers to the Bakun Hydroelectric Project in East Malaysia. Situated on the island of Borneo, Bakun Dam is a 204 m high concrete face, rock filled dam on the Balui River in the Upper Rajang Basin in the rainforests of Sarawak. Bakun Dam and its affiliated infrastructure could be the single largest and most expensive energy project ever undertaken in Southeast Asia. Based on data collected through site visits, original field research in Sarawak, and more than 80 research interviews, the article begins by teasing out the complex history and drivers behind the Bakun project before identifying a set of potential social, political, and economic benefits the project could deliver. It then delves into six sets of barriers in the technical, economic, political, legal and regulatory, social, and environmental realms. We find that Bakun illustrates how centralized energy megaprojects, while ostensibly championed for reasons of economies of scale and the ability to bring about transformational change in the shortest period of time, often fail to address broader development goals such as fighting energy poverty and improving the livelihoods of the local communities they are supposed to serve. - Highlights: > Bakun Dam is concrete face, rock filled dam on the Balui River in the Upper Rajang Basin in the rainforests of Sarawak. > The project faces technical, economic, political, legal and regulatory, social, and environmental barriers. > We conclude the project will fail to fight energy poverty or improve the livelihoods of local populations.

  15. [Analysis of the social and health impacts of large hydroelectric plants: lessons for a sustainable energy management].

    Science.gov (United States)

    de Queiroz, Adriana Renata Sathler; Motta-Veiga, Marcelo

    2012-06-01

    The main objective of this study was to analyze the social and health impacts resulting from the construction of the Tucuruí (Pará, Brazil) and James Bay (Quebec, Canada) Hydroelectric Plants. The comparative method study used in analysis of the literature review revealed lessons to be learned from the national and international experience in order to ensure sustainable management of future major energy projects in Brazil. In this study, a successive negative domino effect was observed in terms of social impacts on jobs, income, sanitation, and culture, all with associated health problems. These included stress, nutritional and psychosocial disturbances, cardiopathies, as well as respiratory and digestive problems. The actions seeking to mitigate the effects of these negative impacts were slow to be implemented. Moreover, even though three decades have elapsed, these actions proved inefficient to resolve all the health and socio-environmental problems caused.

  16. HydroHelp 5 : an excel program developed for pre-feasibility assessment of pump-storage hydroelectric sites

    Energy Technology Data Exchange (ETDEWEB)

    Gordon, J.L.

    2009-01-15

    A series of programs known as HydroHelp have been developed in order to help engineers obtain an initial assessment of a hydro site, with minimum site data. All programs within the series use Microsoft Office, Excel 2003 on Windows XP. This paper presented the HydroHelp software that was developed for the pre-feasibility assessment of pump-storage hydroelectric sites. The paper presented the data input sheet for a pump-turbine project which included detailed instructions on program operation. A schematic of underground work was also provided. The paper reviewed calculations performed by the program, including all basic structure dimensions ranging from reservoir wave heights and the corresponding average rip-rap size on the dam, to the capacity of the powerhouse crane. Cost estimates and a cost summary report were also presented. tabs., figs.

  17. Analysis of Environmental Issues Related to Small-Scale Hydroelectric Development V: Instream Flow Needs for Fishery Resources

    Energy Technology Data Exchange (ETDEWEB)

    Loar, James M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Sale, Michael J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    1981-10-01

    The purpose of this document is to provide guidance to developers of small-scale hydroelectric projects on the assessment of instream flow needs. While numerous methods have been developed to assess the effects of stream flow regulation on aquatic biota in coldwater streams in the West, no consensus has been reached regarding their general applicability, especially to streams in the eastern United States. This report presents and reviews these methods (Section 2.0), which is intended to provide the reader with general background information that is the basis for the critical evaluation of the methods (Section 3.0). The strategy for instream flow assessment presented in Section 4.0 is, in turn, based on the implicit assumptions, data needs, costs, and decision-making capabilities of the various methods as discussed in Section 3.0.

  18. [Fear of falling].

    Science.gov (United States)

    Alcalde Tirado, Pablo

    2010-01-01

    Fear of falling (FF) can be considered as a protective response to a real threat, preventing the elderly from performing activities with high risk of falling, but can also lead to a restriction of the activities that will result in a long-term adverse effect on social, physical or cognitive functions. There is a prevalence of FF in 30% in the elderly who have no history of falls, and double that in those with a history of falling. Its prevalence is increased in women and with advanced age. Several scales have been developed to measure the psychological effects of FF, among which are noted are, the Fall Efficacy Scale (FES), the Activities-specific Balance and Confidence Scale (ABC), and the survey of activities and fear of falling in the elderly (SAFE). It has negative consequences in the functionality, the subjective feeling of well-being, and in the consequent loss of independence. The functional and physical deterioration, or the quality of life is clearly related to the FF, although it has not been established if these factors are cause or effect. Multiple interventions have been recommended, bringing about changes that reinforce their confidence to carry out activities. Interventions and research should promote a realistic and appropriate approach to the risk of falls and teach the elderly to perform activities safely. The reduction in FF is an important goal in itself to improve the subjective feeling of well-being, and the benefits could be increased if this reduction was also accompanied by an increase in safe behaviour, social participation, and activities of the daily life.

  19. Water consumption from hydroelectricity in the United States

    Science.gov (United States)

    Grubert, Emily A.

    2016-10-01

    Understanding the relationship between water and energy systems is important for effective management of both resources. Improved data availability has made more comprehensive modeling of hydropower and its water use possible, even as droughts and climate change have made questions about reservoir evaporation responsiveness more timely. This work makes three main contributions: first, it presents national and regional estimates of gross evaporation and evaporation net of evapotranspiration from local land cover ("net evaporation") for U.S. hydroelectricity, arguing that net evaporation is more consistent with other measures of energy-related water intensity; second, it introduces and validates a method for estimating system-wide evaporation based on primary purpose allocation that reduces data requirements by two orders of magnitude; and third, it makes available for public use a full Penman-Monteith model with multiple built-in sensitivity analyses. Based on this model, the U.S. hydropower system consumes an estimated average of 1.7 m3 of net freshwater per GJ electricity produced (11 m3/GJ gross).

  20. Adaptation of historical technical facility on the small hydroelectric power

    OpenAIRE

    Pavlíček, Jan

    2013-01-01

    Malé vodní elektrárny jsou tématem této bakalářské práce, kterou lze dále rozdělit na tři části. První je věnována historii využívání vodní energie, základním typům hydroenergetických děl a klasifikaci vodních elektráren. Druhá část je zaměřena na malé vodní elektrárny. Získané informace jsou na konec využity v závěrečné části popisující návrh přestavby mlýna v Lomech na malou vodní elektrárnu. Small hydroelectric power stations are the topic of this bachelor thesis which can be divided in...

  1. Culinary and pressure irrigation water system hydroelectric generation

    Energy Technology Data Exchange (ETDEWEB)

    Christiansen, Cory [Water Works Engineers, Pleasant Grove City, UT (United States)

    2016-01-29

    Pleasant Grove City owns and operates a drinking water system that included pressure reducing stations (PRVs) in various locations and flow conditions. Several of these station are suitable for power generation. The City evaluated their system to identify opportunities for power generation that can be implemented based on the analysis of costs and prediction of power generation and associated revenue. The evaluation led to the selection of the Battle Creek site for development of a hydro-electric power generating system. The Battle Creek site includes a pipeline that carries spring water to storage tanks. The system utilizes a PRV to reduce pressure before the water is introduced into the tanks. The evaluation recommended that the PRV at this location be replaced with a turbine for the generation of electricity. The system will be connected to the utility power grid for use in the community. A pelton turbine was selected for the site, and a turbine building and piping system were constructed to complete a fully functional power generation system. It is anticipated that the system will generate approximately 440,000 kW-hr per year resulting in $40,000 of annual revenue.

  2. Changes in parameters of hydroelectric generators at modernization

    Energy Technology Data Exchange (ETDEWEB)

    Pinsky, Grigori B. [Electrosila, Saint Petersburg (Russian Federation)]. E-mail: ftf@elsila.spb.ru

    2000-07-01

    This paper discusses the changes in parameters of hydroelectric generators at modernization. The lines of approaches in different regions and periods of time have varied depending on economic circumstances arisen and on changes of the property form as well. Therefore, all the attempts undertaken earlier to work out a general concept for realization of the inevitable modernization of the main power equipment of hydraulic electric stations did not give any positive result. Even unified norms on determining the stock service life of such equipment were failed to elaborate. The reasons underlie in the variety of parameters, design versions, manufacturing methods, as well as in the diversity of service conditions, operation duties, culture and quality of repairs, etc. The development of a unified satisfactory algorithm covering all mentioned and other important conditions seems to be impossible. Consequently, the way of expert judgement based upon generalization and analyzing the previous operational experience and enriched with the data of objective control remains to be dominant. From this report discussion it should be evidently drawn a summary conclusion: the present-day potentialities of electric engineering on up-rating the power of generators at modernization, considering the general progress in technologies as well as advances in the sphere of materials, exceed the real needs of potential customers. Practically any demands of such a kind may be covered without extra charges for civil engineering work, hoisting equipment and erection sites.

  3. Sustainable siting procedure of small hydroelectric plants: The Greek experience

    Energy Technology Data Exchange (ETDEWEB)

    Tsoutsos, Theocharis; Maria, Efpraxia; Mathioudakis, Vassilis [Technical University of Crete, University Campus, GR 73100 Chania (Greece)

    2007-05-15

    This paper aims to present the procedure under which a sustainable plant, like a small hydroelectric plant (SHP), can be installed and deployed, especially in countries with complicated administrative and legislative systems. Those must be defined by the rules that characterize sustainable spatial planning, which aims at the environmental protection, the insurance of better living conditions and finally at the economic development within the frame of the principle of sustainability and its three basic dimensions: social, economical and environmental. The main principles of spatial planning are accepted from the jurisprudence of the Hellenic Council of State, either as an appropriate condition for the protection of important ecosystems or as specific expression of the principle of prevention of environmental damage. In this framework it is accepted that the development is experienced, initially to a total and general planning, whose essential part is the assessment and modification of distributed land uses. Besides, the main characteristics of the siting of SHPs and the criteria demanded for their smooth integration and operation are presented. (author)

  4. NEURAL CASCADED WITH FUZZY SCHEME FOR CONTROL OF A HYDROELECTRIC POWER PLANT

    Directory of Open Access Journals (Sweden)

    A. Selwin Mich Priyadharson

    2014-01-01

    Full Text Available A novel design for flow and level control in a hydroelectric power plant using Programmable Logic Controller (PLC-Human Machine Interface (HMI and neural cascaded with fuzzy scheme is proposed. This project will focus on design and development of flow and level controller for small scale hydro generating units by implementing gate control based on PLC-HMI with the proposed scheme. The existing control schemes have so many difficulties to manage intrinsic time delay, nonlinearity due to uncertainty of the process and frequent load changes. This study presents the design of neuro controllers to regulate level, cascaded with fuzzy controller to control flow in gate valve to the turbine. A prototype model is fabricated in the laboratory as experimental setup for flow and level control and real time simulation studies were carried out using PID and neural cascaded with fuzzy scheme. The designed prototype model is fabricated with 5 levels in the upper tank and 2 levels in the lower tank. Based on the outputs of the level sensors from the upper and lower tanks, the ladder logic is actuated. This project work uses PLC of Bernecker and Rainer (B and R Industrial Automation inbuilt with 20 digital inputs and provides 12 potential free outputs to control the miniaturized process depicted in this work. Finally, the performance of the proposed neural cascaded with fuzzy scheme is evaluated by simulation results by comparing with conventional controllers output using real time data obtained from the hydro power plant. The advantages of the proposed neural cascaded with fuzzy scheme over the existing controllers are highlighted.

  5. Jackson Mills and Mine Falls Dams, Nashua, New Hampshire. Reconnaissance Report, Hydroelectric Feasibility. Volume 1, Jackson Mills Dam.

    Science.gov (United States)

    1979-12-01

    triacanthos Honey Locust Acer saccharinum Silver maple Pinus nigra Austrian pire Crataegus spp. Hawthorns osa spp.’ Wild roses Ulmus americana American elm...nightshade Acer platano ides Norway map’e Comus stoloniera Red-Osier Dogwood Morus mibra Red mulberry Lonicera tatarica Tartarian Honeysuckle Prunus sp

  6. Serial DC systems applied to small-scale hydroelectric power plants; Sistemas serie em corrente continua aplicados as pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Martinez, Manuel L.B.; Rosa, Paulo C. [Escola Federal de Engenharia de Itajuba, MG (Brazil); Martinez, Carlos B. [Minas Gerais Univ., Belo Horizonte, MG (Brazil). Dept. de Engenharia Hidraulica e Recursos Hidricos

    1996-12-31

    The utilization of the remaining potential in brazilian South and Southeast regions, specially those close to the biggest demand areas, have been conditioned by the high costs of the initialization of the socio and environmental impacts. As a consequence, the viability of the traditional energy production systems (hydraulic power plants) need a revaluation of its costs, especially in what concerns the generation plants and their auxiliary systems. This paper discusses several considerations concerning of serial DC small-scale hydroelectric power plants, giving especial attention to the technical conditions and control aspects which must be observed during the planning and the project phases 9 refs., 4 figs.

  7. The News, Fall 2002.

    Science.gov (United States)

    Giles, Ray, Ed.

    2002-01-01

    This fall 2002 newsletter from the Community College League of California contains several articles, news stories, and the brochure from the 2002 Annual Convention, "Celebrating the Way California LEARNS." Articles include: (1) "Nursing Shortage Poses Dilemma for Colleges: Access vs. Efficiency," a discussion of the debate over…

  8. FHR Iowa Falls Approval

    Science.gov (United States)

    This October 22, 2015, letter from EPA approves the petition from Flint Hills Resources, LLC, regarding non-grandfathered ethanol produced through the FHR Iowa Falls Process, qualifying under the Clean Air Act for renewable fuel (D-code 6) RINs under the R

  9. Hydropower Projects

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-04-02

    The Water Power Program helps industry harness this renewable, emissions-free resource to generate environmentally sustainable and cost-effective electricity. Through support for public, private, and nonprofit efforts, the Water Power Program promotes the development, demonstration, and deployment of advanced hydropower devices and pumped storage hydropower applications. These technologies help capture energy stored by diversionary structures, increase the efficiency of hydroelectric generation, and use excess grid energy to replenish storage reserves for use during periods of peak electricity demand. In addition, the Water Power Program works to assess the potential extractable energy from domestic water resources to assist industry and government in planning for our nation’s energy future. From FY 2008 to FY 2014, DOE’s Water Power Program announced awards totaling approximately $62.5 million to 33 projects focused on hydropower. Table 1 provides a brief description of these projects.

  10. Mortality of silver eel (Anguilla anguilla migrating downstream through a small hydroelectric plant on the Drawa River in northern Poland

    Directory of Open Access Journals (Sweden)

    Dębowski Piotr

    2016-06-01

    Full Text Available The European eel, Anguilla anguilla L., is an endangered species. Barriers to its downstream spawning migration are one of the greatest threats this species faces. There are hundreds of hydroelectric plants (HEP on rivers in Poland (> 600, and thousands throughout Europe. Eel that pass through HEP turbines as they migrate downstream suffer high mortality, but this depends mainly on local and technical conditions. Silver eel mortality was estimated and the possibility of the fish bypassing the turbines was studied between November 2013 and June 2014 at a typical HEP in northern Poland. Two telemetry methods were used with 49 eel: passive integrated transponder (PIT system and acoustic telemetry. Fifty five percent of eel migrated downstream in fall 2013, soon after their release, and 45% migrated the next spring. The eel did not use the fish passes designed for upstream migration; thus, they were forced to go through the turbines, which resulted in 55% mortality. HEPs cause interruptions and delays in eel spawning migrations and are responsible for high eel mortality. This can make implementing an eel restitution plan difficult or even impossible in river systems with many barriers.

  11. Project PAT (Pumps Working as Turbines)/IG (Induction Generators): a new concept for generation of electric power through micro scale hydroelectric power plants; Projeto BFT (Bombas Funcionado como Turbinas)/GI (Geradores de Inducao): um novo conceito para geracao de energia eletrica atraves de microcentrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Viana, Augusto Nelson Carvalho [Universidade Federal de Itajuba (UNIFEI), Itajuba, MG (Brazil). Inst. de Recursos Naturais. Programa de Pos-graduacao em Engenharia da Energia; Medeiros, Daniel de Macedo; Ricardo, Mateus [Universidade Federal de Itajuba (UNIFEI), Itajuba, MG (Brazil). Inst. de Recursos Naturais], Emails: augusto@unifei.edu.br, macedo@unifei.edu.br, mathidr@yahoo.com.br

    2006-07-01

    The present work has as objective to present the main bases of 'PAT/IG Project', accomplished in Boa Esperanca Farm (Delfim Moreira - MG), by an accord between Itajuba's Federal University and Mines and Energy Ministry. In a moment that the look for sustainable development is the law in Brazil, low costs and environmental impact alternatives must be prioritized. By this way, the PAT/IG Project continuous the Viana's (1987) works, that developed all Brazilian theoretical bases for using Pumps Working as Turbine (PAT). Besides that, the application of induction motors operating as induction generators will be evaluated, as the velocity control system of the PAT/IG group will be developed. The existing Boa Esperanca Farm's micro power plant will be rebuild ed, to receive a new generating group formed for a PAT and a IG, that will be used as natural sized test workbench of Itajuba's Federal University. At the ending of the project, there will be enough subsidies to prove, in practice, the feasibility presented in laboratorial tests by PAT/IG groups as conventional turbines replacer in micro powerplants. (author)

  12. Novel Hierarchical Fall Detection Algorithm Using a Multiphase Fall Model

    Science.gov (United States)

    Hsieh, Chia-Yeh; Liu, Kai-Chun; Huang, Chih-Ning; Chu, Woei-Chyn; Chan, Chia-Tai

    2017-01-01

    Falls are the primary cause of accidents for the elderly in the living environment. Reducing hazards in the living environment and performing exercises for training balance and muscles are the common strategies for fall prevention. However, falls cannot be avoided completely; fall detection provides an alarm that can decrease injuries or death caused by the lack of rescue. The automatic fall detection system has opportunities to provide real-time emergency alarms for improving the safety and quality of home healthcare services. Two common technical challenges are also tackled in order to provide a reliable fall detection algorithm, including variability and ambiguity. We propose a novel hierarchical fall detection algorithm involving threshold-based and knowledge-based approaches to detect a fall event. The threshold-based approach efficiently supports the detection and identification of fall events from continuous sensor data. A multiphase fall model is utilized, including free fall, impact, and rest phases for the knowledge-based approach, which identifies fall events and has the potential to deal with the aforementioned technical challenges of a fall detection system. Seven kinds of falls and seven types of daily activities arranged in an experiment are used to explore the performance of the proposed fall detection algorithm. The overall performances of the sensitivity, specificity, precision, and accuracy using a knowledge-based algorithm are 99.79%, 98.74%, 99.05% and 99.33%, respectively. The results show that the proposed novel hierarchical fall detection algorithm can cope with the variability and ambiguity of the technical challenges and fulfill the reliability, adaptability, and flexibility requirements of an automatic fall detection system with respect to the individual differences. PMID:28208694

  13. The determinants of cost efficiency of hydroelectric generating plants: A random frontier approach

    Energy Technology Data Exchange (ETDEWEB)

    Barros, Carlos P. [Instituto Superior de Economia e Gestao, Technical University of Lisbon, Rua Miguel Lupi, 20, 1249-078 Lisbon (Portugal); Peypoch, Nicolas [GEREM, IAE, University of Perpignan Via Domitia, 52 avenue Paul Alduy, F-66860 Cedex Perpignan cedex (France)

    2007-09-15

    This paper analyses the technical efficiency in the hydroelectric generating plants of a main Portuguese electricity enterprise EDP (Electricity of Portugal) between 1994 and 2004, investigating the role played by increase in competition and regulation. A random cost frontier method is adopted. A translog frontier model is used and the maximum likelihood estimation technique is employed to estimate the empirical model. We estimate the efficiency scores and decompose the exogenous variables into homogeneous and heterogeneous. It is concluded that production and capacity are heterogeneous, signifying that the hydroelectric generating plants are very distinct and therefore any energy policy should take into account this heterogeneity. It is also concluded that competition, rather than regulation, plays the key role in increasing hydroelectric plant efficiency. (author)

  14. Modeling and Simulation Research on Lightning Over-voltage of 500kV Hydroelectric Station

    Directory of Open Access Journals (Sweden)

    Huang Wang-jun

    2012-08-01

    Full Text Available Lightning over-voltage amplitude of equipments on different branch nodes of the arterials has been obtained after the modeling and simulation analysis based on the EMTP (electromagnetic transients program were done on the lightning over-voltage of a 500kV hydroelectric station was with the system’s worst working condition (single-line, single-transforming, and the line tower on the near side of 500kv hydroelectric station’s GIS was struck by lightning. Thus, precise data have been acquired to select suitable equipments and verify the resisting lightning performance of the station. Finally, reasonable measures (such as reducing pulse resistance of line tower are proposed to improve the comprehensive lightning resisting level of hydroelectric stations.

  15. Pressurized GRP pipes for hydroelectric plants; GFK-Druckrohrleitungen fuer Wasserkraftanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Kiesselbach, Gerhard [Dr. Kiesselbach Consulting GmbH, Wien (Austria)

    2009-05-15

    GRP pipes have been in successful use for the pressurized pipelines of hydroelectric power plants for many years. This piping stock is notable, in particular, for its low-cost installation, operation and maintenance, in addition to its low weight, simple installation and resistance to corrosion. One can safely assume that GRP pipes will, in future, be used even more for pressurized hydroelectric power-plant piping, in which context it is essential that the corresponding operations during pipe-laying and installation are conducted in accordance with the acknowledged rules of technology and the manufacturer's guidelines. The following article is intended to provide an overview of the planning, installation, operation and maintenance of pressurized GRP pipes for hydroelectric power plants. (orig.)

  16. Optimal operation of cascaded hydroelectric power plants in the power market

    Institute of Scientific and Technical Information of China (English)

    蔡兴国; 马平; 林士颖

    2004-01-01

    An improved network flow algorithm, which includes the minimum cost network flow and the same period network flow, is proposed to solve the optimization of cascaded hydroelectric power plants in a competitive electricity market. The typical network flow is used to find the feasible flow and add the discharge water to different cascaded hydroelectric power plants at the same step. The same period network flow is used to find the optimal flow and add the power output at a different step. This new algorithm retains the advantages of the typical network flow, such as simplicity and ease of realization. The result of the case analysis indicates that the new algorithm can achieve high calculation precision and can be used to calculate the optimal operation of cascaded hydroelectric power plants.

  17. The little hydro-electricity: the boosting?; Petit hydraulique: la relance?

    Energy Technology Data Exchange (ETDEWEB)

    Brunier, S. [Helianthe, Espace Information Energie de l' Ain (France); Najac, C. [Groupement de Producteurs d' Energie Hydroelectrique, 75 - Paris (France); Roussel, A.M. [Electricite Autonome Francaise (EAF), 92 - Le Plessis Robinson (France); Claustre, R [Comite de Liaison Energies Renouvelables (CLER), 93 - Montreuil (France); Baril, D. [Delegue Regional du Conseil Superieur de la Peche, Languedoc Roussillon, PACA, Corse (France); Marty, D.; Lefevre, P. [Hydro-M, 31 - Toulouse (France); Arnould, M. [WWF - Programme Rivieres vivantes, 42 - Saint-Etienne (France)

    2007-05-15

    The hydraulic energy could be easily developed in France to reach the objectives of the european directive on the renewable energies. This development can be assured by the construction of power plants perfectly integrated in their environment and respecting the rivers and assured also by the increase of the capacities of existing power plants as it is allowing by the new regulations. This document presents the place and the capacity of the hydro-electricity in France, the implementing of a green electricity, the existing regulation, the river biological continuation, the ecosystems and the little hydro-electricity and the example of the hydro-electric power plant of Scey-sur-Saone. (A.L.B.)

  18. Impasses e controvérsias da hidreletricidade Impasses and controversies of hydroelectricity

    Directory of Open Access Journals (Sweden)

    Célio Bermann

    2007-04-01

    Full Text Available O presente artigo faz uma avaliação da hidreletricidade no Brasil a partir da sua importância na matriz elétrica do país, do caráter prioritário que a geração hidrelétrica assume na gestão dos recursos hídricos, e dos impasses e controvérsias do ponto de vista social e ambiental decorrentes da implantação e operação dos empreendimentos hidrelétricos. Para ilustrar as questões levantadas com relação às grandes usinas, são referenciados dois estudos de caso - a UHE Tijuco Alto, em processo de licenciamento ambiental pelo Ibama; e a UHE Barra Grande, cujo processo de licenciamento foi marcado por uma série de irregularidades. Por fim, são apontadas possíveis alternativas para a geração hidrelétrica, em particular a repotenciação de usinas e um maior incentivo às pequenas centrais hidrelétricas.This article assesses hydroelectricity in Brazil according to its importance as one of the country’s main energy sources and also to its social and environmental impasses and controversies derived from the implantation and operation of hydroelectric undertakings. In order to illustrate the questions related to large power plants that are brought up along the article, two case reports are presented: Tijuco Alto Hydroelectric Power Plant, which is going through Ibama’s (Brazilian Institute for the Environment and Renewable Natural Resources environmental license process; and Barra Grande Hydroelectric Power Plant, whose environmental license process has been affected by several irregularities. Finally, possible alternatives for hydroelectric production are pointed out, particularly power plant re-potentiation and a greater incentive to undersized hydroelectric plants.

  19. The Resource. Fall 2001

    Science.gov (United States)

    2001-01-01

    Adams, Director of Scientific Visualization, initiated a Bring Your Own Data ( BYOD ) workshop for MSRC users. The first workshop was held June 25-26 in...leverage these assets in their future work. The first BYOD workshop was definitely a benefit to the users. Chris Stone, in particular was able to...publications 28 ERDC MSRC The Resource, Fall 2001 ac ro ny m s AG Access Grid AMR Adaptive Mesh Refinement BYOD Bring Your Own Data CDC Control Data

  20. Albeni Falls Wildlife Mitigation : Annual Report 2002.

    Energy Technology Data Exchange (ETDEWEB)

    Terra-Berns, Mary

    2003-01-01

    The Albeni Falls Interagency Work Group continued to actively engage in implementing wildlife mitigation actions in 2002. Regular Work Group meetings were held to discuss budget concerns affecting the Albeni Falls Wildlife Mitigation Program, to present potential acquisition projects, and to discuss and evaluate other issues affecting the Work Group and Project. Work Group members protected 1,386.29 acres of wildlife habitat in 2002. To date, the Albeni Falls project has protected approximately 5,914.31 acres of wildlife habitat. About 21% of the total wildlife habitat lost has been mitigated. Administrative activities have increased as more properties are purchased and continue to center on restoration, operation and maintenance, and monitoring. In 2001, Work Group members focused on development of a monitoring and evaluation program as well as completion of site-specific management plans. This year the Work Group began implementation of the monitoring and evaluation program performing population and plant surveys, data evaluation and storage, and map development as well as developing management plans. Assuming that the current BPA budget restrictions will be lifted in the near future, the Work Group expects to increase mitigation properties this coming year with several potential projects.

  1. Modeling a falling slinky

    CERN Document Server

    Cross, R C

    2012-01-01

    A slinky is an example of a tension spring: in an unstretched state a slinky is collapsed, with turns touching, and a finite tension is required to separate the turns from this state. If a slinky is suspended from its top and stretched under gravity and then released, the bottom of the slinky does not begin to fall until the top section of the slinky, which collapses turn by turn from the top, collides with the bottom. The total collapse time t_c (typically ~0.3 s for real slinkies) corresponds to the time required for a wave front to propagate down the slinky to communicate the release of the top end. We present a modification to an existing model for a falling tension spring (Calkin 1993) and apply it to data from filmed drops of two real slinkies. The modification of the model is the inclusion of a finite time for collapse of the turns of the slinky behind the collapse front propagating down the slinky during the fall. The new finite-collapse time model achieves a good qualitative fit to the observed posit...

  2. Modeling a falling slinky

    Science.gov (United States)

    Cross, R. C.; Wheatland, M. S.

    2012-12-01

    A slinky is an example of a tension spring: in an unstretched state a slinky is collapsed, with turns touching, and a finite tension is required to separate the turns from this state. If a slinky is suspended from its top and stretched under gravity and then released, the bottom of the slinky does not begin to fall until the top section of the slinky, which collapses turn by turn from the top, collides with the bottom. The total collapse time tc (typically ˜0.3 s for real slinkies) corresponds to the time required for a wave front to propagate down the slinky to communicate the release of the top end. We present a modification to an existing model for a falling tension spring [Calkin, Am. J. Phys. 61, 261-264 (1993)] and apply it to data from filmed drops of two real slinkies. The modification of the model is the inclusion of a finite time for collapse of the turns of the slinky behind the collapse front propagating down the slinky during the fall. The new finite-collapse time model achieves a good qualitative fit to the observed positions of the top of the real slinkies during the measured drops. The spring constant k for each slinky is taken to be a free parameter in the model. The best-fit model values for k for each slinky are approximately consistent with values obtained from measured periods of oscillation of the slinkies.

  3. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Science.gov (United States)

    2010-04-01

    ... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... requirements for hydroelectric small power production facilities located at a new dam or diversion. (a) A... means of a new dam or diversion (as that term is defined in § 292.202(p)) is a qualifying facility...

  4. Legal obstacles and incentives to the development of small scale hydroelectric power in Pennsylvania

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. In Pennsylvania, there are 3 methods by which rights in water may be acquired: riparian ownership, prescription, and condemnation. These are discussed.

  5. Evaluation of the Life Cycle Greenhouse Gas Emissions from Hydroelectricity Generation Systems

    Directory of Open Access Journals (Sweden)

    Akhil Kadiyala

    2016-06-01

    Full Text Available This study evaluated the life cycle greenhouse gas (GHG emissions from different hydroelectricity generation systems by first performing a comprehensive review of the hydroelectricity generation system life cycle assessment (LCA studies and then subsequent computation of statistical metrics to quantify the life cycle GHG emissions (expressed in grams of carbon dioxide equivalent per kilowatt hour, gCO2e/kWh. A categorization index (with unique category codes, formatted as “facility type-electric power generation capacity” was developed and used in this study to evaluate the life cycle GHG emissions from the reviewed hydroelectricity generation systems. The unique category codes were labeled by integrating the names of the two hydro power sub-classifications, i.e., the facility type (impoundment (I, diversion (D, pumped storage (PS, miscellaneous hydropower works (MHPW and the electric power generation capacity (micro (µ, small (S, large (L. The characterized hydroelectricity generation systems were statistically evaluated to determine the reduction in corresponding life cycle GHG emissions. A total of eight unique categorization codes (I-S, I-L, D-µ, D-S, D-L, PS-L, MHPW-µ, MHPW-S were designated to the 19 hydroelectricity generation LCA studies (representing 178 hydropower cases using the proposed categorization index. The mean life cycle GHG emissions resulting from the use of I-S (N = 24, I-L (N = 8, D-µ (N = 3, D-S (N = 133, D-L (N = 3, PS-L (N = 3, MHPW-µ (N = 3, and MHPW-S (N = 1 hydroelectricity generation systems are 21.05 gCO2e/kWh, 40.63 gCO2e/kWh, 47.82 gCO2e/kWh, 27.18 gCO2e/kWh, 3.45 gCO2e/kWh, 256.63 gCO2e/kWh, 19.73 gCO2e/kWh, and 2.78 gCO2e/kWh, respectively. D-L hydroelectricity generation systems produced the minimum life cycle GHGs (considering the hydroelectricity generation system categories with a representation of at least two cases.

  6. Case studies of the legal and institutional obstacles and incentives to the development of small-scale hydroelectric power: South Columbia Basin Irrigation District, Pasco, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Schwartz, L.

    1980-05-01

    The case study concerns two modern human uses of the Columbia River - irrigation aimed at agricultural land reclamation and hydroelectric power. The Grand Coulee Dam has become synonomous with large-scale generation of hydroelectric power providing the Pacific Northwest with some of the least-expensive electricity in the United States. The Columbia Basin Project has created a half-million acres of farmland in Washington out of a spectacular and vast desert. The South Columbia River Basin Irrigation District is seeking to harness the energy present in the water which already runs through its canals, drains, and wasteways. The South District's development strategy is aimed toward reducing the costs its farmers pay for irrigation and raising the capital required to serve the remaining 550,000 acres originally planned as part of the Columbia Basin Project. The economic, institutional, and regulatory problems of harnessing the energy at site PEC 22.7, one of six sites proposed for development, are examined in this case study.

  7. Multiple issues of a hydroelectric dam project in west Africa and integrated evaluation of human and environmental impacts; Pluralite des enjeux d'un projet de barrage en Afrique de l'Ouest et evaluation integree des impacts humains et environnementaux

    Energy Technology Data Exchange (ETDEWEB)

    Circe, M. [Tecsult Inc., Montreal, PQ (Canada)

    2007-07-01

    The energy and sustainable development plan of the Niger Government involves the construction of the Kandadji dam to regulate the flow of the Niger River and to produce electricity in order to meet the energy needs of the population. The Kandadji dam project is also considered a vital infrastructure investment to ensure water resources for irrigation purposes for food security and to improve health conditions in the Niger River valley. Niger's energy plan is intended to ensure environmental protection in the exploitation and consumption of energy resources, the promotion of new and renewable energy sources and access to energy by all citizens. An environmental impact assessment was conducted as part of the project feasibility study. This presentation highlighted the environmental problems that have affected the river in recent years which could possibly cause ecological and socio-economic problems in the short term, such as conservation of natural heritage. It was determined that there are no technical or geological challenges facing the construction of the Kandadji dam. A seismic study has established the safety of the proposed earth dam, which would be built using local material. 20 figs.

  8. Factors influencing the recession rate of Niagara Falls since the 19th century

    Science.gov (United States)

    Hayakawa, Yuichi S.; Matsukura, Yukinori

    2009-09-01

    The rate of recession of Niagara Falls (Horseshoe and American Falls) in northeastern North America has been documented since the 19th century; it shows a decreasing trend from ca. 1 m y - 1 a century ago to ca. 0.1 m y - 1 at present. Reduction of the flow volume in the Niagara River due to diversion into bypassing hydroelectric schemes has often been taken to be the factor responsible, but other factors such as changes in the waterfall shape could play a role and call for a quantitative study. Here, we examine the effect of physical factors on the historically varying recession rates of Niagara Falls, using an empirical equation which has previously been proposed based on a non-dimensional multiparametric model which incorporates flow volume, waterfall shape and bedrock strength. The changes in recession rates of Niagara Falls in the last century are successfully modeled by this empirical equation; these changes are caused by variations in flow volume and lip length. This result supports the validity of the empirical equation for waterfalls in rivers carrying little transported sediment. Our analysis also suggests that the decrease in the recession rate of Horseshoe Falls is related to both artificial reduction in river discharge and natural increase in waterfall lip length, whereas that of American Falls is solely due to the reduction in flow volume.

  9. Fall prevention walker during rehabilitation

    Science.gov (United States)

    Tee, Kian Sek; E, Chun Zhi; Saim, Hashim; Zakaria, Wan Nurshazwani Wan; Khialdin, Safinaz Binti Mohd; Isa, Hazlita; Awad, M. I.; Soon, Chin Fhong

    2017-09-01

    This paper proposes on the design of a walker for the prevention of falling among elderlies or patients during rehabilitation whenever they use a walker to assist them. Fall happens due to impaired balance or gait problem. The assistive device is designed by applying stability concept and an accelerometric fall detection system is included. The accelerometric fall detection system acts as an alerting device that acquires body accelerometric data and detect fall. Recorded accelerometric data could be useful for further assessment. Structural strength of the walker was verified via iterations of simulation using finite element analysis, before being fabricated. Experiments were conducted to identify the fall patterns using accelerometric data. The design process and detection of fall pattern demonstrates the design of a walker that could support the user without fail and alerts the helper, thus salvaging the users from injuries due to fall and unattended situation.

  10. Exercises to help prevent falls

    Science.gov (United States)

    ... ency/patientinstructions/000493.htm Exercises to help prevent falls To use the sharing features on this page, ... even more serious injuries. Exercising can help prevent falls because it can: Make your muscles stronger and ...

  11. The Application of Traits-Based Assessment Approaches to Estimate the Effects of Hydroelectric Turbine Passage on Fish Populations

    Energy Technology Data Exchange (ETDEWEB)

    Cada, Glenn F [ORNL; Schweizer, Peter E [ORNL

    2012-04-01

    One of the most important environmental issues facing the hydropower industry is the adverse impact of hydroelectric projects on downstream fish passage. Fish that migrate long distances as part of their life cycle include not only important diadromous species (such as salmon, shads, and eels) but also strictly freshwater species. The hydropower reservoirs that downstream-moving fish encounter differ greatly from free-flowing rivers. Many of the environmental changes that occur in a reservoir (altered water temperature and transparency, decreased flow velocities, increased predation) can reduce survival. Upon reaching the dam, downstream-migrating fish may suffer increased mortality as they pass through the turbines, spillways and other bypasses, or turbulent tailraces. Downstream from the dam, insufficient environmental flow releases may slow downstream fish passage rates or decrease survival. There is a need to refine our understanding of the relative importance of causative factors that contribute to turbine passage mortality (e.g., strike, pressure changes, turbulence) so that turbine design efforts can focus on mitigating the most damaging components. Further, present knowledge of the effectiveness of turbine improvements is based on studies of only a few species (mainly salmon and American shad). These data may not be representative of turbine passage effects for the hundreds of other fish species that are susceptible to downstream passage at hydroelectric projects. For example, there are over 900 species of fish in the United States. In Brazil there are an estimated 3,000 freshwater fish species, of which 30% are believed to be migratory (Viana et al. 2011). Worldwide, there are some 14,000 freshwater fish species (Magurran 2009), of which significant numbers are susceptible to hydropower impacts. By comparison, in a compilation of fish entrainment and turbine survival studies from over 100 hydroelectric projects in the United States, Winchell et al. (2000

  12. Falls in degenerative cerebellar ataxias

    NARCIS (Netherlands)

    van de Warrenburg, Bart P C; Steijns, Janneke A G; Munneke, Marten; Kremer, Berry P H; Bloem, Bastiaan R

    2005-01-01

    We retrospectively and prospectively assessed the frequency and characteristics of falls in patients with degenerative cerebellar ataxias. The results show that falls occur very frequently in patients with degenerative cerebellar ataxias and that these falls are serious and often lead to injuries or

  13. The falls and the fear of falling among elderly institutionalized

    Directory of Open Access Journals (Sweden)

    Patrícia Almeida

    2013-06-01

    Full Text Available In the present study it is intended to characterize the history of falls and to evaluate the fear to fall in aged institutionalized. The sample is composed for 113 institutionalized aged people, 32 men and 81 women with a average 82,96 ± 7,03 age of years. The data had been collected by means of a questionnaire and statistical analyzed (descriptive statistics, parametric tests - Test T and Anova - Test U-Mann Whitney, and Test of Kruskal-Wallis – and the Test of Tukey. The results point in the direction of that the women present a bigger number of falls (24.8% and greater fear to fall (Med=55. The falls had occurred in its majority in the context of the room of the institutions. It was verified that people who had at least a fall experience present greater fear to fall comparatively (Med=55 with that they had not the same had no incident of fall in period of time (Med=77. Our results come to strengthen the hypothesis of the changeable sex to be able to be considered a factor of fall risk. Aged that they present a history of falls seems to be more vulnerable to develop the fear to fall.

  14. [Fall risk and fracture. Aging and fall/fracture].

    Science.gov (United States)

    Kozaki, Koichi

    2013-05-01

    Fall deteriorates QOL and ADL of elderly people, especially when they suffer from hip and vertebral fractures. It is not easy to identify the cause of falling, because falling usually result from multiple factors. Among various potential causes, osteoporosis, osteoarthritis, medication of hypnotic drugs, and environmental factors are important, because they are frequent and can be modifiable. When evaluating fall risks, grasping power, one-leg standing time, timed up&go test, are useful. On the other hand, fall risk index, 22-item self-assessment test, is easy and even better in predicting future falls. In the Cochrane systematic review article 2009, exercise such as Tai-Chi, withdrawal of hypnotic drugs, and vitamin D supplementation are shown to prevent falls in community-dwelling elderly.

  15. Falling Liquid Films

    CERN Document Server

    Kalliadasis, S; Scheid, B

    2012-01-01

    This research monograph gives a detailed review of the state-of-the-art theoretical methodologies for the analysis of dissipative wave dynamics and pattern formation on the surface of a film falling down a planar, inclined substrate. This prototype is an open-flow hydrodynamic instability representing an excellent paradigm for the study of complexity in active nonlinear media with energy supply, dissipation and dispersion. Whenever possible, the link between theory and experiments is illustrated and the development of order-of-magnitude estimates and scaling arguments is used to facilitate the

  16. Why Rhodes must fall

    OpenAIRE

    Newsinger, J

    2016-01-01

    The international Rhodes Must Fall campaign has reinvigorated public interest in the legacy of Cecil Rhodes, Empire and the production of historical memory. But it has also been subject to a fierce backlash in the rightwing media, which has fought against the campaign at an Oxford college to remove a statue of Cecil Rhodes both on the grounds of free speech (and the right to offend) and on the grounds that Rhodes must be judged by the standards of his time. Here, the author revisits Rhodes’ l...

  17. `In free fall'

    Science.gov (United States)

    Beijerinck, Herman C. W.

    2014-01-01

    Physicists in the lead of a fiction book or a play, that's a rare event! Writers in general do not understand physics, while physicists seldom have the talent of writing for a large audience. So when it happens, we should rejoice. The up-and-coming German author Juli Zeh [1] (1974), who studied law, has succeeded in combining beautiful prose, psychological drama, crime and physics in a challenging book `In free fall' [2]. A good friend of hers, Bettina Bruinier, has put the core message of the book into a compelling play in the `Volkstheater' in Munich [1]. Yes, it can be done.

  18. Analysis of synchronous and induction generators used at hydroelectric power plant

    Science.gov (United States)

    Diniş, C. M.; Popa, G. N.; lagăr, A.

    2017-01-01

    In this paper is presented an analysis of the operating electric generators (synchronous and induction) within a small capacity hydroelectric power plant. Such is treated the problem of monitoring and control hydropower plant using SCADA systems. Have been carried an experimental measurements in small hydropower plant for different levels of water in the lake and various settings of the operating parameters.

  19. 75 FR 51258 - Boott Hydropower, Inc.; Eldred L Field Hydroelectric Facility Trust; Notice of Application for...

    Science.gov (United States)

    2010-08-19

    ... Energy Regulatory Commission Boott Hydropower, Inc.; Eldred L Field Hydroelectric Facility Trust; Notice... No.: 2790-055. c. Date Filed: July 6, 2010. d. Applicant: Boott Hydropower, Inc. and Eldred L Field... Hydropower, Inc., One Tech Drive, Suite 220, Andover, MA 01810. Tel: (978) 681-1900 Ext 809. i. FERC Contact...

  20. Competence-Oriented Decision Model for Optimizing the Operation of a Cascading Hydroelectric Power Reservoir

    Directory of Open Access Journals (Sweden)

    Tilahun Derib Asfaw

    2013-07-01

    Full Text Available The operation of the four Perak cascading reservoirs namely, Temenggor, Bersia, Kenering and Chenderoh analyzed using the newly developed genetic algorithm model. The reservoirs are located in the state of Perak of Peninsular Malaysia that used for hydroelectric power generation and flood mitigation. The hydroelectric potential of the cascading scheme is 578 MW. However, the actual annual average generation was 228 MW, which is about 39% of the potential. The research aimed to improve the annual average hydroelectric power generation. The result of the fitness value used to select the optimal option from the test of eight model runs options. After repeated runs of the optimal option, the best model parameters are found. Therefore, optimality achieved at population size of 150, crossover probability of 0.75 and generation number of 60. The operation of GA model produced an additional of 12.17 MW per day. The additional power is found with the same total annual volume of release and similar natural inflow pattern. The additional hydroelectric power can worth over 22 million Ringgit Malaysia per year. In addition, it plays a significant role on the growing energy needs of the country.

  1. Determining generator parameters of Camargos hydroelectric power plant through frequency response measurement

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Sebastiao E.M. de; Padua Guarini, Antonio de [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Souza, Joao A. de; Valgas, Helio M.; Pinto, Roberto del Giudice R. [Companhia Energetica de Minas Gerais (CEMIG), Belo Horizonte, MG (Brazil)

    1994-12-31

    This work describes the results of the set frequency response tests performed in the generator number 2, 6.9 kV, 25 MVA, of Camargos hydroelectric power plant, CEMIG, and the parameters relatives to determined structures of model. This tests are unpublished in Brazil. (author) 7 refs., 16 figs., 7 tabs.

  2. Coins falling in water

    CERN Document Server

    Heisinger, Luke; Kanso, Eva

    2013-01-01

    When a coin falls in water, its trajectory is one of four types determined by its dimensionless moment of inertia $I^\\ast$ and Reynolds number Re: (A) steady; (B) fluttering; (C) chaotic; or (D) tumbling. The dynamics induced by the interaction of the water with the surface of the coin, however, makes the exact landing site difficult to predict a priori. Here, we describe a carefully designed experiment in which a coin is dropped repeatedly in water, so that we can determine the probability density functions (pdf) associated with the landing positions for each of the four trajectory types, all of which are radially symmetric about the center-drop line. In the case of the steady mode, the pdf is approximately Gaussian distributed, with variances that are small, indicating that the coin is most likely to land at the center, right below the point it is dropped from. For the other falling modes, the center is one of the least likely landing sites. Indeed, the pdf's of the fluttering, chaotic and tumbling modes ar...

  3. A Wildlife Habitat Protection, Mitigation and Enhancement Plan for Eight Federal Hydroelectric Facilities in the Willamette River Basin: Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Preston, S.K.

    1987-05-01

    The development and operation of eight federal hydroelectric projects in the Willamette River Basin impacted 30,776 acres of prime wildlife habitat. This study proposes mitigative measures for the losses to wildlife and wildlife habitat resulting from these projects, under the direction of the Columbia River Basin (CRB) Fish and Wildlife Program. The CRB Fish and Wildlife Program was adopted in 1982 by the Northwest Power Planning Council, pursuant to the Northwest Power Planning Act of 1980. The proposed mitigation plan is based on the findings of loss assessments completed in 1985, that used a modified Habitat Evaluation Procedure (HEP) to assess the extent of impact to wildlife and wildlife habitat, with 24 evaluation species. The vegetative structure of the impacted habitat was broken down into three components: big game winter range, riparian habitat and old-growth forest. The mitigation plan proposes implementation of the following, over a period of 20 years: (1) purchase of cut-over timber lands to mitigate, in the long-term, for big game winter range, and portions of the riparian habitat and old-growth forest (approx. 20,000 acres); (2) purchase approximately 4,400 acres of riparian habitat along the Willamette River Greenway; and (3) three options to mitigate for the outstanding old-growth forest losses. Monitoring would be required in the early stages of the 100-year plan. The timber lands would be actively managed for elk and timber revenue could provide O and M costs over the long-term.

  4. 76 FR 165 - Meetings of the Paterson Great Falls National Historical Park Advisory Commission

    Science.gov (United States)

    2011-01-03

    ... National Park Service Meetings of the Paterson Great Falls National Historical Park Advisory Commission... of the meeting of the Paterson Great Falls National Historical Park Advisory Commission. DATES: The... Bolger, Project Director, Paterson Great Falls National Historical Park National ] Park Service,...

  5. Hydroelectric enterprises and social and environmental vulnerabilities at the Amazon: the case of Madeira river; Empreendimentos hidreletricos e vulnerabilidade socioambiental na Amazonia: o caso da bacia do rio Madeira

    Energy Technology Data Exchange (ETDEWEB)

    Sena, Jose Antonio [Universidade Federal do Rio de Janeiro (PPE/COPPE/UFRJ), RJ (Brazil). Coordenacao dos Programas de Pos-Graduacao de Engenharia. Programa de Planejamento Energetico], E-mail: joseantoniosena@gmail.com

    2010-07-01

    The environmental impacts resulting from the implementation of hydropower projects bring up issues related to environmental protection, the right of affected people, changes in hydrological parameters and other effects that refer to aspects of environmental and socioeconomic vulnerability. The evaluation of the parameters that make up the vulnerability can often be useful both of primary diagnosis of possible interference from hydroelectric power plant and to carry out post project predictions. The use of Geographic Information Systems (GIS) allows the superposition of layers of information on the various dimensions of vulnerability and shows a useful tool for this type of environmental analysis in the Amazon region. (author)

  6. Effects of Hyporheic Exchange Flows on Egg Pocket Water Temperature in Snake River Fall Chinook Salmon Spawning Areas, 2002-2003 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hanrahan, T.; Geist, D.; Arntzen, C. (Pacific Northwest National Laboratory)

    2004-09-01

    The development of the Snake River hydroelectric system has affected fall Chinook salmon smolts by shifting their migration timing to a period (mid- to late-summer) when downstream reservoir conditions are unfavorable for survival. Subsequent to the Snake River Chinook salmon fall-run Evolutionary Significant Unit being listed as Threatened under the Endangered Species Act, recovery planning has included changes in hydrosystem operations (e.g., summer flow augmentation) to improve water temperature and flow conditions during the juvenile Chinook salmon summer migration period. In light of the limited water supplies from the Dworshak reservoir for summer flow augmentation, and the associated uncertainties regarding benefits to migrating fall Chinook salmon smolts, additional approaches for improved smolt survival need to be evaluated. This report describes research conducted by the Pacific Northwest National Laboratory (PNNL) that evaluated relationships among river discharge, hyporheic zone characteristics, and egg pocket water temperature in Snake River fall Chinook salmon spawning areas. This was a pilot-scale study to evaluate these relationships under existing operations of Hells Canyon Dam (i.e., without any prescribed manipulations of river discharge) during the 2002-2003 water year. The project was initiated in the context of examining the potential for improving juvenile Snake River fall Chinook salmon survival by modifying the discharge operations of Hells Canyon Dam. The potential for improved survival would be gained by increasing the rate at which early life history events proceed (i.e., incubation and emergence), thereby allowing smolts to migrate through downstream reservoirs during early- to mid-summer when river conditions are more favorable for survival. PNNL implemented this research project at index sites throughout 160 km of the Hells Canyon Reach (HCR) of the Snake River. The HCR extends from Hells Canyon Dam (river kilometer [rkm] 399

  7. Environmental impacts of increased hydroelectric development at existing dams

    Energy Technology Data Exchange (ETDEWEB)

    Railsback, S. F. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Cada, G. F. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Petrich, C. H. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Sale, M. J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Shaakir-Ali, J. A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Watts, J. A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Webb, J. W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    1991-04-01

    This report describes the environmental impacts of a proposed U.S. Department of Energy (DOE) initiative to promote the development of hydropower resources at existing dams. Hydropower development at existing dams has, in general, fewer impacts than development of additional fossil-fueled resources or hydropower at new dams, although potential cumulative impacts of developing multiple hydropower projects have not been explicitly addressed. Environmental review of project impacts and mitigation needs can ensure that additional hydropower development at existing dams can provide a renewable resource with fewer impacts than alternative resources.

  8. White River Falls Fish Passage Project, Tygh Valley, Oregon : Final Technical Report, Volume III, Appendix B, Fisheries Report; Appendix C, Engineering Alternative Evaluation; Appendix D, Benefit/Cost Analysis.

    Energy Technology Data Exchange (ETDEWEB)

    Oregon. Dept. of Fish and Wildlife; Mount Hood National Forest (Or.)

    1985-06-01

    Studies were conducted to describe current habitat conditions in the White River basin above White River Falls and to evaluate the potential to produce anadromous fish. An inventory of spawning and rearing habitats, irrigation diversions, and enhancement opportunities for anadromous fish in the White River drainage was conducted. Survival of juvenile fish at White River Falls was estimated by releasing juvenile chinook and steelhead above the falls during high and low flow periods and recapturing them below the falls in 1983 and 1984. Four alternatives to provide upstream passage for adult salmon and steelhead were developd to a predesign level. The cost of adult passage and the estimated run size of anadromous fish were used to determine the benefit/cost of the preferred alternative. Possible effects of the introduction of anadromous fish on resident fish and on nearby Oak Springs Hatchery were evaluated. This included an inventory of resident species, a genetic study of native rainbow, and the identification of fish diseases in the basin. This volume contains appendices of habitat survey data, potential production, resident fish population data, upstream passage designs, and benefit/cost calculations. (ACR)

  9. Fall prevention in nursing homes

    DEFF Research Database (Denmark)

    Andresen, Mette; Hauge, Johnny

    2006-01-01

    that the number of hospitalization after a fall injury will become an even greater task for the Danish hospitals, The aim of the study was to show if there is a relationship between physically frail elderly nursing home resident’s subjective evaluation of fall-risk and an objective evaluation of their balance....... Further, to suggest tools for fall prevention in nursing home settings on the basis of the results of this study and the literature. A quantitative method inspired by the survey method was used to give an overview of fall patterns, subjective and objective evaluations of fallrisk. Participants were 16...... physically frail elderly nursing home residents from three different nursing homes. Measures: a small staff-questionnaire about incidences and places where the participants had falling-episodes during a 12 month period, The Falls Effi cacy Scale Swedish version (FES(S)) and Berg Balance Scale (BBS) Results...

  10. Impact of hydroelectric development upon a northern Manitoba native community

    Energy Technology Data Exchange (ETDEWEB)

    Waldram, J.B.

    1983-01-01

    This dissertation describes the process of underdevelopment among the Cree Indian people of South Indian Lake, in Northern Manitoba, Canada, following the construction of the Churchill-Nelson River Hydro Project in 1975. The dissertation seeks to link the ecological, political, economic, socio-cultural and health aspects of the impact of the hydro project within the framework of the historical process of underdevelopment as it has occurred in Latin America, among Native people in the United States, and among Native people in Northern Canada. Utilizing both qualitative and quantitative data, a process of increased dependence is described as the product of two related processes. The first process is the impairment of the local commercial and domestic economy caused by the flooding of Southern Indian Lake, which has resulted in a decline in local productivity. The second process is the enhancement of consumerism through rising consumer expectations and a post-project increase in available goods and services which the people are increasingly unable to afford. The overall result has been a process of economic divergence at the local level. The dissertation concludes that the process of underdevelopment which has occurred in South Indian Lake has been the result primarily of changes in the local ecological system caused by the construction of the hydro project. These ecological changes have, in turn, resulted in secondary changes in the socio-economic system.

  11. Effects of Hyporheic Exchange Flows on Egg Pocket Water Temperature in Snake River Fall Chinook Salmon Spawning Areas

    Energy Technology Data Exchange (ETDEWEB)

    Hanrahan, Timothy P.; Geist, David R.; Arntzen, Evan V.; Abernethy, Cary S.

    2004-09-24

    The development of the Snake River hydroelectric system has affected fall chinook salmon smolts by shifting their migration timing to a period when downstream reservoir conditions are unfavorable for survival. Subsequent to the Snake River chinook salmon fall-run Evolutionary Significant Unit being listed as Threatened under the Endangered Species Act, recovery planning has included changes in hydrosystem operations to improve water temperature and flow conditions during the juvenile chinook salmon summer migration period. In light of the limited water supplies from the Dworshak reservoir for summer flow augmentation, and the associated uncertainties regarding benefits to migrating fall chinook salmon smolts, additional approaches for improved smolt survival need to be evaluated. This report describes research conducted by PNNL that evaluated relationships among river discharge, hyporheic zone characteristics, and egg pocket water temperature in Snake River fall chinook salmon spawning areas. The potential for improved survival would be gained by increasing the rate at which early life history events proceed (i.e., incubation and emergence), thereby allowing smolts to migrate through downstream reservoirs during early- to mid-summer when river conditions are more favorable for survival. PNNL implemented this research project throughout 160 km of the Hells Canyon Reach (HCR) of the Snake River. The hydrologic regime during the 2002?2003 sampling period exhibited one of the lowest, most stable daily discharge patterns of any of the previous 12 water years. The vertical hydraulic gradients (VHG) between the river and the riverbed suggested the potential for predominantly small magnitude vertical exchange. The VHG also showed little relationship to changes in river discharge at most sites. Despite the relatively small vertical hydraulic gradients at most sites, the results from the numerical modeling of riverbed pore water velocity and hyporheic zone temperatures

  12. Delhi Dons question economics of Chamera hydel project

    Energy Technology Data Exchange (ETDEWEB)

    1986-03-01

    The economic feasibility of the Chamera hydroelectric project in India is discussed. This project is located on the Ravi River in the Chamba district of Himachal Pradesh. It will have an underground powerhouse with an installed capacity of 540 MW with three turbines at 180 MW each. The research and estimated cost of the Chamera project are given. The time pattern of cash flow and the cost of electricity from the project are also discussed.

  13. Falling for Fall Reading Games: Great Stories for the Season

    Science.gov (United States)

    Maxwell, D. Jackson

    2004-01-01

    Literacy games are just another strategy in the ultimate goal to increase reading and overall student academic performance. Activities such as the Fall reading game, which focuses on the Fall season, which encourage reluctant readers to take the beginning steps toward developing the skills they would need to become accomplished readers are…

  14. The Mitigation Potential of Buffer Strips for Reservoir Sediment Yields: The Itumbiara Hydroelectric Power Plant in Brazil

    Directory of Open Access Journals (Sweden)

    Marta P. Luz

    2016-10-01

    Full Text Available Soil erosion and deposition mechanisms play a crucial role in the sustainability of both existing reservoirs and newly planned projects. Soil erosion is one of the most important factors influencing sediment transport yields, and, in the context of existing reservoirs, the surrounding watersheds supply both runoff and sediment yield to the receiving water body. Therefore, appropriate land management strategies are needed to minimize the influence of sediment yields on reservoir volume and, hence, the capacity of power generation. In this context, soil erosion control measures such as buffer strips may provide a practical and low-cost option for large reservoirs, but need to be tested at the catchment scale. This paper represents a study case for the Itumbiara hydroelectric power plant (HPP in Brazil. Four different scenarios considering radially planted buffer strips of Vetivergrass with widths of 20 m, 40 m, 100 m and 200 m are analyzed. A semi-distributed hydrological model, SWAT, was used to perform the simulations. Results indicate a reduction of sediments transported to the reservoir of between 0.2% and 1.0% per year is possible with buffer strip provision, and that this reduction, over the life of Itumbiara HPP, may prove important for lengthening the productivity of the plant.

  15. Revolutionising landscapes: Hydroelectricity and the heavy industrialisation of society and environment in the Comte de Beauharnois, 1927--1948

    Science.gov (United States)

    Pelletier, Louis-Raphael

    This dissertation analyses the rapid industrialisation of the rural Comte de Beauharnois and the adjacent stretch of the Fleuve Saint-Laurent owing to the construction, between 1929 and 1948, of a gigantic canal for hydroelectricity production and navigation by an electricity corporation called the Beauharnois Light Heat and Power (BLH&P). Using principally the archives of the BLH&P---especially its complaints files and its rich photographic record---this thesis argues that this process exemplifies the finance capitalist reorganisation of the society and ecosystems of the Canadian province of Quebec from the 19th century to the Great Depression. In keeping with recent work in environmental history, the transformation of rural landscapes and a river for heavy industry is described as an important dimension of a revolution in modes of production. More specifically, I argue that, in the case under study, the finance-capitalist reorganisation of Quebec revolved around two central and explicit projects, one social and the other environmental: the grouping of most individuals in an industrial working class without control over the means of production and the reorganisation of rural landscapes into reservoirs of modern energy and industrial natural resources.

  16. Efficiency on execution of environmental regulations for hydroelectric enterprising; Eficiencia na execucao das normas ambientais para empreendimentos hidroeletricos

    Energy Technology Data Exchange (ETDEWEB)

    Nadaud, Gabriela Caiuby Ariani; Young, Carlos Eduardo Frickmann [Universidade Federal do Rio de Janeiro (IE/GEMA/UFRJ), RJ (Brazil). Inst. de Economia. Grupo de Economia do Meio Ambiente e do Desenvolvimento Sustentavel], E-mail: young@ie.ufrj.br

    2010-07-01

    Viewing a more efficiency in the accomplishment of environmental regulations related to hydroelectric enterprises, this paper presents a proposal for indexes which can help the enterprise. From the verification that the accomplishment of legal requests to obtain the licensing does not minimizes the conflict risks and the consequent expenses, this index methodology presents himself as an tool which allows more efficient compensation measurements and the consequent reduction of the social-environmental costs of the hydroelectric enterprises.

  17. The new political scales of citizenship in a global era: The politics of hydroelectric development in the James Bay Region

    Science.gov (United States)

    Rousseau, Jean

    2000-10-01

    In this dissertation, I examine the current reconfiguration of citizenship in Western societies in a period marked by the expansion of globalisation. Specifically, I focus on the spatial implications of globalisation via a comparative analysis of the politics of hydroelectric development, in the James Bay region of Quebec, Canada. I discuss the struggles surrounding its two main phases: the construction of the La Grande complex (1970--1975) and the aborted launching of the Great Whale project (1988--1994). I pay close attention to the mobilisation of the Cree people and ecology groups who launched successive campaigns to prevent the construction of both projects, reflecting what I depict as process of jumping scales. Whereas their campaigns were unsuccessful during the first phase, they became much more potent during the second phase. This transition reveals an important remapping of citizenship politics through which its national and territorial scales are being unbundled and no longer exclusively restricted to national state borders. As a result, citizenship politics becomes embedded in various locales---from the local to the emerging global. Each represents a political scene in which citizens can make claims and participate in debates around the recognition of their rights. This dissertation would contribute to the debates on citizenship and globalisation. It suggests that globalisation not only imposes new constraints on citizenship policies from above, but also creates now spaces in which citizenship is reframed or rather, rescaled. This dissertation also provides insights into the implications of globalisation. It illustrates how the globalisation of politics results from non-state actors, reflecting what is called "globalisation from below". This reveals contradictory forms of globalisation and implicitly, different political projects.

  18. Fun with Falling Man

    Science.gov (United States)

    Mosley, Clay R.

    2009-01-01

    A shiny human figure turned into a car or a jet--what kid (or kid at heart) wouldn't enjoy these images? The author found that showing his students these shiny human sculptures by artist Ernest Trova (1927-2009) was a great place to start an exciting sculpture project with his fourth-grade students. In the 1960s, Ernest Trova created a painting of…

  19. Fun with Falling Man

    Science.gov (United States)

    Mosley, Clay R.

    2009-01-01

    A shiny human figure turned into a car or a jet--what kid (or kid at heart) wouldn't enjoy these images? The author found that showing his students these shiny human sculptures by artist Ernest Trova (1927-2009) was a great place to start an exciting sculpture project with his fourth-grade students. In the 1960s, Ernest Trova created a painting of…

  20. 78 FR 45918 - Application for Presidential Permit; Soule River Hydroelectric Project

    Science.gov (United States)

    2013-07-30

    ... Portland Canal in Southeast Alaska, and continue to the BC Hydro Stewart Substation on the north side of... line would eventually transition to overhead and terminate at the BC Hydro Stewart Substation...

  1. Snettisham Hydroelectric Project, Alaska Second Stage Development, Crater Lake. Final Foundation Report

    Science.gov (United States)

    1992-09-04

    tunnel was under about 850 ft of cover and was approaching the Tlingit Shear Zone, the miners performed an inordinate amount of scaling on the side walls...construction. The adjacent bolt holes produced no water, although length and attitude were similar. 40 The Tlingit Shear Zone produced the largest single

  2. 75 FR 73059 - Record of Decision and Floodplain Statement of Findings for the Cushman Hydroelectric Project...

    Science.gov (United States)

    2010-11-29

    ... the Tribe, and other interested parties concurred in the MOA. The MOA includes a Treatment Plan that... Part 1022 (Compliance with Floodplain and Wetland Environmental Review Requirements), DOE considered... benefits anadromous fish by improving channel habitat and removing instream barriers. The use of a floating...

  3. 78 FR 48661 - Application for Presidential Permit; Soule River Hydroelectric Project: Correction

    Science.gov (United States)

    2013-08-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY... FURTHER INFORMATION CONTACT: Christopher Lawrence (Program Office) at 202-586-5260 or via electronic mail... via electronic mail at Katherine.Konieczny@hq.doe.gov . Procedural Matters: Copies of this application...

  4. Efficiency analysis of hydroelectric generating plants: A case study for Portugal

    Energy Technology Data Exchange (ETDEWEB)

    Barros, Carlos Pestana [Instituto Superior de Economia e Gestao, Technical University of Lisbon, Rua Miguel Lupi, 20, 1249-078 Lisbon (Portugal)

    2008-01-15

    This paper estimates changes in total productivity, breaking this down into technically efficient change and technological change, by means of data envelopment analysis (DEA) applied to the hydroelectric energy generating plants of EDP - the Portugal Electricity Company. The aim of this procedure is to seek out those best practices that will lead to improved performance in the energy market. We rank the plants according to their change in total productivity for the period 2001-2004, concluding that some plants experienced productivity growth while others experienced a decrease in productivity. The implications arising from the study are that EDP should adopt an internal benchmark management procedure in order to evaluate the relative position of each hydroelectric generating plant and to adopt managerial strategies designed to catch up with the frontier of 'best practices'. As the frontier is shifting along the time, constant efforts are needed in this respect along the time. (author)

  5. Efficiency analysis of hydroelectric generating plants: a case study for Portugal

    Energy Technology Data Exchange (ETDEWEB)

    Pestana Barros, C. [Technical University of Lisbon (Portugal). Instituto Superior de Economia e Gestao

    2008-01-15

    This paper estimates changes in total productivity, breaking this down into technically efficient change and technological change, by means of data envelopment analysis (DEA) applied to the hydroelectric energy generating plants of EDP - the Portugal Electricity Company. The aim of this procedure is to seek out those best practices that will lead to improved performance in the energy market. We rank the plants according to their change in total productivity for the period 2001-2004, concluding that some plants experienced productivity growth while others experienced a decrease in productivity. The implications arising from the study are that EDP should adopt an internal benchmark management procedure in order to evaluate the relative position of each hydroelectric generating plant and to adopt managerial strategies designed to catch up with the frontier of ''best practices''. As the frontier is shifting along the time, constant efforts are needed in this respect along the time. (author)

  6. Dam safety review, classification of dams for the Novia Scotia Power Inc. Black River hydroelectric system

    Energy Technology Data Exchange (ETDEWEB)

    Alderman, Aaron; Small, Andy [AMEC Earth and environmental, Fredericton, (Canada); O' Neil, Ellis [Nova Scotia Power Inc., Halifax, (Canada)

    2010-07-01

    In 2009, AMEC was retained by Nova Scotia Power Inc. (NSPI) to conduct a dam safety review of the dams that are part of the Black River Hydroelectric System. This paper presented the results of this dam classification exercise which was carried out for the Bear River hydroelectric system in Nova Scotia, based on the 2007 Canadian Dam Association (CDA) dam safety guidelines. Flood mapping and dam-break analysis were performed for events ranging from the 1:100 year to PMF flood events, including cascading events. These results were used to draw up a classification of the dams. Associated design criteria were then developed. Following the assessment of the dam sites, conclusions and recommendations were discussed. The recommendations were presented in terms of regular maintenance items and reconstruction items, which are now used by NSPI to determine the party responsible for undertaking the recommendation and for evaluation of the maintenance and reconstruction schedules.

  7. Legal obstacles and incentives to the development of small scale hydroelectric power in Ohio

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level is described. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. A developer must obtain title or interest to a streambed from the proper riparian owners. Ohio provides assistance to an electric company in this undertaking by providing it with the power of eminent domain in the event it is unable to reach a purchase agreement with the riparian proprietors. The Ohio Water Law is discussed in detail, followed by discussions: Licensing, Permitting, and Review Procedures; Indirect Considerations; Ohio Public Utilities Commission; Ohio Department of Energy; Incidental Provision; and Financial Considerations.

  8. Legal obstacles and incentives to the development of small scale hydroelectric power in Connecticut

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric power in Connecticut are discussed. The Federal government also exercises extensive regulatory authority in the area and this dual system is examined from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC. Connecticut follows the riparian theory of water law. Under this theory of the water law, private rights in rivers and streams are confined to the use of flowing water. A riparian proprietor does not own the water that flows by his estate. Licensing, permitting, and review procedures are discussed followed by discussion on public utilities regulation and indirect considerations.

  9. Legal obstacles and incentives to the development of small scale hydroelectric power in Indiana

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy in Indiana are examined. The Federal government also exercises extensive regulatory authority in the area. An examination is made of the Federal-state relationships with the aim of creating a more orderly understanding of the vagaries of the system. The introductory chapter examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. The Indiana water law; direct and indirect regulations; the Public Service Commission of Indiana; and financial considerations are examined.

  10. Legal obstacles and incentives to the development of small scale hydroelectric potential in Illinois

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are described. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of the hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. The first obstacle which every developer in Illinois must confront is obtaining authority to utilize the river bed, banks, and flowing water at the proposed site. This involves determination of ownership of the stream banks and bed and the manner of obtaining either their title or use; and existing constraints with regard to the use of the water. Illinois follows the riparian theory of water law. Following the detailed discussion of the water law, direct and indirect regulations and financial considerations are discussed.

  11. High Rhine power plant Rheinfelden and hydroelectric power in Germany; Hochrheinkraftwerk Rheinfelden und Wasserkraft in Deutschland

    Energy Technology Data Exchange (ETDEWEB)

    Mazurkiewicz, Jacek [EnBW Energie Baden-Wuerttemberg AG, Karlsruhe (Germany)

    2011-10-15

    In Germany, electric energy had been generated from water power since 1880; in the beginning, it was a dominating factor along with energy generation from coal, but it lost its importance as from 1950 when crude oil, natural gas and nuclear power became dominant. Since 1991, however, many small hydroelectric power plants have again been put into operation, or have been newly built, as a consequence of the government aids granted. In the Hochrhein (High Rhine) region, the German-Swiss power plant Rheinfelden was reconstructed, and other major hydroelectric power plants are being modernized. Technically, a much greater potential could be used, but this is currently not practicable for economical and ecological reasons. (orig.)

  12. Does the creation of a boreal hydroelectric reservoir result in a net change in evaporation?

    Science.gov (United States)

    Strachan, Ian B.; Tremblay, Alain; Pelletier, Luc; Tardif, Simon; Turpin, Christian; Nugent, Kelly A.

    2016-09-01

    Estimates of water consumption from hydroelectricity production are hampered by a lack of common methodological approaches. Studies typically use gross evaporation estimates which do not take into account the evaporative water loss from the pre-flooded ecosystems that would occur without the presence of a reservoir. We evaluate the net change in evaporation following the creation of a hydroelectric reservoir located in the Canadian boreal region. We use a direct measurement technique (eddy covariance) over four different ecosystems to evaluate the pre- and post-flood landscape water flux over a five-year period. The net effect of reservoir creation was to increase evaporation over that of the pre-flooded ecosystem. This change was dependent both on management and differences in the timing of the evaporation with nighttime and autumn contributing strongly to the reservoir evaporation. Managed reduction of water level, and thus the evaporating area, reduced the evaporation.

  13. Synanthropy of mosquitoes and sand flies near the Aimorés hydroelectric power plant, Brazil.

    Science.gov (United States)

    Barata, R A; Ursine, R L; Nunes, F P; Morais, D H; Araújo, H S

    2012-12-01

    The environmental changes resulting from the construction of hydroelectric dams may affect the fauna of insect vectors and consequently the epidemiology of the diseases they transmit. This work examined the mosquito and sand fly fauna in the area of the Aimorés hydroelectric power plant, analyzing the seasonal distribution and the degree of species synanthropy in different ecotopes. Between November, 2008 and September, 2009, entomological captures were performed with the help of HP light traps in the rural, urban, and forest areas of Aimorés, Ituêta, Resplendor, and Baixo Guandu counties. The fauna proved to be quite diversified. Twenty-two species of mosquitoes and 11 species of sand flies were found. Culex quinquefasciatus was predominant among mosquitoes (76.7%), while Lutzomyia intermedia prevailed among sand flies (34.5%). Some of the captured species have medical interest. Supported by the high degree of synanthropy, those species reinforce the need for epidemiological surveillance.

  14. Pump as turbines in hydroelectric engineering; Pumpen als Turbinen in der Wasserwirtschaft

    Energy Technology Data Exchange (ETDEWEB)

    Orchard, Bryan

    2010-07-01

    When a liquid flows backwards through a gyropump, i.e. from the outlet side to the inlet side, the rotational direction of the rotor will revert. Given a sufficient height of drop, the breakaway torque of the rotor and shaft will be overcome. The rotary momentum can be used, e.g., for driving a generator. An example of such an application is found in the Breech hydroelectric power plant of the Stuttgarter Landeswasserversorgung utility. (orig.)

  15. Feasibility study for a hydroelectric installation on the Arno River (Italy)

    OpenAIRE

    Micheli, Lorenzo

    2011-01-01

    Energy need is a primary requirement of our society. Many interests and concerns turn around this matter. It includes policy, economy, environment, etc... Renewable energy is considered to be a good alternative from fossil sources and nuclear power. Renewable sources are known as “green” because of the low impact on the Earth equilibriums. Furthermore they are not exhaustible because they utilize the ecosystem cycles. Hydroelectricity is an established technology. In most of...

  16. Legal obstacles and incentives to the development of small scale hydroelectric power in New York

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. The first step the small scale hydroelectric developer must take is that of acquiring title to the real property comprising the development site. The real estate parcel must include the requisite interest in the land adjacent to the watercourse, access to the underlying streambed and where needed, the land necessary for an upstream impoundment area. Land acquisition may be effectuated by purchase, lease, or grant by the state. In addition to these methods, New York permits the use of the eminent domain power of the state for public utilities under certain circumstances.

  17. Analysis of the Level-Release Polynomial from a Hydroelectric Plant

    Directory of Open Access Journals (Sweden)

    Ieda Hidalgo

    2012-02-01

    Full Text Available The mathematic representation of the tailrace elevation as function of the water release can be modified, for example, by the geomorphologic impact of large floods. The level-release polynomial from a hydroelectric plant is important information to computational models used for optimization and simulation of the power generation systems operation. They depend on data quality to provide reliable results. Therefore, this paper presents a method for adjusting of the tailrace polynomial based on operation data recorded by the plant’s owner or company. The proposed method uses a non-linear regression tool, such as Trendline in Excel. A case study has been applied to the data from a large Brazilian hydroelectric plant whose operation is under the coordination of the Electric System ational Operator. The benefits of the data correction are analyzed using a simulation model for the hydroelectric plants operation. This simulator is used to reproduce the past operation of the plant, first with official data and second with adjusted data. The results show significant improvements in terms of quality of the data, contributing to bring the real and simulated operation closer.

  18. Analysis of the Level-Release Polynomial from a Hydroelectric Plant

    Directory of Open Access Journals (Sweden)

    Ieda Hidalgo

    2012-02-01

    Full Text Available The mathematic representation of the tailrace elevation as function of the water release can be modified, for example, by the geomorphologic impact of large floods. The level-release polynomial from a hydroelectric plant is important information to computational models used for optimization and simulation of the power generation systems operation. They depend on data quality to provide reliable results. Therefore, this paper presents a method for adjusting of the tailrace polynomial based on operation data recorded by the plant’s owner or company. The proposed method uses a non-linear regression tool, such as Trendline in Excel. A case study has been applied to the data from a large Brazilian hydroelectric plant whose operation is under the coordination of the Electric System ational Operator. The benefits of the data correction are analyzed using a simulation model for the hydroelectric plants operation. This simulator is used to reproduce the past operation of the plant, first with official data and second with adjusted data. The results show significant improvements in terms of quality of the data, contributing to bring the real and simulated operation closer.

  19. NSGA-II for optimizing water supply and hydroelectric power generation of Two-Reservoir System

    Science.gov (United States)

    Wang, K.; Chang, L.; Chang, F.

    2008-12-01

    Taiwan is located at the subtropical zone, which has nonuniform temporal and spatial distributions of precipitation. The Jhuoshuei River is the Taiwan longest river (186 Km) and has abundant water resources. In the last several decades, the constant population growth and the dramatic economic development have resulted in a tremendous demand for natural resources, especially water. How to effectively manage the water resources is one of the most important task for hydrologist. This paper presents a non-dominated sorting genetic algorithm (NSGA-II) to derive a set of optimal joint operating rule curves for a two-reservoir system, Wu-She Reservoir and Jih-Yueh-Tan Reservoir, in the Jhuoshuei river system. These two series reservoirs are the most important reservoirs for supplying water and hydroelectric power generation. The NSGA-II is coupled with an integrated operational simulation model to search the optimal joint rule curves for minimizing shortage indices (SI) and maximizing Hydroelectric Power generation. The Pareto-front solutions obtained from NSGA-II provide the decision maker with a wide range of choices. The results indicate that NSGA-II is a promising approach. The plentiful optimal solutions along the Pareto front allow the decision maker to choose the best compromise solution after consideration of the trade-offs between water supply and hydroelectric power generation.

  20. Yakima Fisheries Project : Revised Draft Environmental Impact Statement, Summary.

    Energy Technology Data Exchange (ETDEWEB)

    Confederated Tribes and Bands of the Yakama Nation, Washington; Washington (State). Dept. of Fish and Wildlife.

    1995-05-01

    The Bonneville Power Administration (BPA) proposes to fund the Yakima Fisheries Project (YFP) to undertake fishery research and enhancement activities in the Yakima River Basin. The State of Washington and the Yakima Indian Nation would jointly direct the project. The Yakima River system is a promising location for mitigation and enhancement to compensate for stock losses from development and operation of hydroelectric projects elsewhere in the Columbia Basin. The YFP would help determine the role that supplementation might play in increasing natural production of anadromous salmonids throughout the Columbia Basin. In cooperation with BPA, the project managers propose to construct, operate and maintain anadromous (e.g. salmon) fish production facilities. The goal is to conduct research activities designed to increase knowledge of supplementation techniques. These techniques would be applied to rebuild naturally spawning anadromous fish stocks historically present in the Yakima River Basin and, ultimately, those throughout the Columbia River Basin. Eventually, the YFP might involve the supplementation of all stocks of anadromous fish known to have occurred in the Yakima Basin. However, at this time only two alternatives have been proposed: Alternative 1 would supplement depressed naturally spawning populations of upper Yakima spring chinook salmon; Alternative 2 (preferred) would include all actions under Alternative 1; it would also add a study to determine the feasibility of re-establishing a naturally spawning population and a significant fall fishery for coho salmon in the Yakima Basin. (Coho smolts are currently being imported from another basin under the Columbia River Basin Fish Management Plan; the stock is now virtually eliminated from the Basin.)

  1. Falls in elderly hemodialysis patients.

    Science.gov (United States)

    Abdel-Rahman, E M; Turgut, F; Turkmen, K; Balogun, R A

    2011-10-01

    The elderly, (age ≥ 65 years) hemodialysis (HD) patient population is growing rapidly across the world. The risk of accidental falls is very high in this patient population due to multiple factors which include aging, underlying renal disease and adverse events associated with HD treatments. Falls, the most common cause of fatal injury among elderly, not only increase morbidity and mortality, but also increase costs to the health system. Prediction of falls and interventions to prevent or minimize fall risk and associated complications will be a major step in helping these patients as well as decreasing financial and social burdens. Thus, it is vital to learn how to approach this important problem. In this review, we will summarize the epidemiology, risk factors, pathophysiology and complications of falls in elderly HD patients. We will also focus on available methods to assess and predict the patients at higher risk of falling and will provide recommendations for interventions to reduce the occurrence of falls in this population.

  2. Radar fall detectors: a comparison

    Science.gov (United States)

    Erol, Baris; Amin, Moeness; Ahmad, Fauzia; Boashash, Boualem

    2016-05-01

    Falls are a major cause of accidents in elderly people. Even simple falls can lead to severe injuries, and sometimes result in death. Doppler fall detection has drawn much attention in recent years. Micro-Doppler signatures play an important role for the Doppler-based radar systems. Numerous studies have demonstrated the offerings of micro-Doppler characteristics for fall detection. In this respect, a plethora of micro-Doppler signature features have been proposed, including those stemming from speech recognition and wavelet decomposition. In this work, we consider four different sets of features for fall detection. These can be categorized as spectrogram based features, wavelet based features, mel-frequency cepstrum coefficients, and power burst curve features. Support vector machine is employed as the classifier. Performance of the respective fall detectors is investigated using real data obtained with the same radar operating resources and under identical sensing conditions. For the considered data, the spectrogram based feature set is shown to provide superior fall detection performance.

  3. 75 FR 50760 - Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving...

    Science.gov (United States)

    2010-08-17

    ... of Project: Swan Lake North Hydroelectric Project. f. Location: Approximately 11 miles northeast of Klamath Falls in Klamath County, Oregon. The project would be a closed-loop pumped storage project...

  4. SisFall: A Fall and Movement Dataset

    Science.gov (United States)

    Sucerquia, Angela; López, José David; Vargas-Bonilla, Jesús Francisco

    2017-01-01

    Research on fall and movement detection with wearable devices has witnessed promising growth. However, there are few publicly available datasets, all recorded with smartphones, which are insufficient for testing new proposals due to their absence of objective population, lack of performed activities, and limited information. Here, we present a dataset of falls and activities of daily living (ADLs) acquired with a self-developed device composed of two types of accelerometer and one gyroscope. It consists of 19 ADLs and 15 fall types performed by 23 young adults, 15 ADL types performed by 14 healthy and independent participants over 62 years old, and data from one participant of 60 years old that performed all ADLs and falls. These activities were selected based on a survey and a literature analysis. We test the dataset with widely used feature extraction and a simple to implement threshold based classification, achieving up to 96% of accuracy in fall detection. An individual activity analysis demonstrates that most errors coincide in a few number of activities where new approaches could be focused. Finally, validation tests with elderly people significantly reduced the fall detection performance of the tested features. This validates findings of other authors and encourages developing new strategies with this new dataset as the benchmark. PMID:28117691

  5. Community College Estimated Growth: Fall 2010

    Science.gov (United States)

    Phillippe, Kent; Mullin, Christopher M.

    2011-01-01

    A survey from the American Association of Community Colleges (AACC) found that enrollment growth in fall 2010 slowed its pace at community colleges, increasing 3.2% from the previous year. This contrasts with more dramatic increases in recent years: more than 11% between fall 2008 and fall 2009, and nearly 17% between fall 2007 and fall 2009,…

  6. Hydroelectric modelling of the Paraiba do Sul and Jequitinhonha rivers sub-basins by using the VALORAGUA computer program; Modelagem hidreletrica das sub bacias dos rios Paraiba do Sul e Jequitinhonha utilizando o programa VALORAGUA

    Energy Technology Data Exchange (ETDEWEB)

    Ferreira, Vinicius Verna Magalhaes; Aronne, Ivan Dionysio [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN), Belo Horizonte, MG (Brazil)]. E-mails: vvmf@urano.cdtn.br; aroneid@urano.cdtn.br; Martinez, Carlos Barreira; Versiani, Bruno Rabelo [Minas Gerais Univ., Belo Horizonte, MG (Brazil). Escola de Engenharia. Dept. de Engenharia Hidraulica e Recursos Hidricos]. E-mail: martinez@cce.ufmg.br; versiani@ehr.ufmg.br

    2002-07-01

    This work presents a modelling of 50 hydroelectric power plants in the East Atlantica hydro graphic basin, operating, under construction or as basic projects. The simulations are performed by using the VALORAGUA computer code, developed by the EDP - Eletricidade de Portugal. The studies concentrate mostly on the sub basins of the Jequitinhonha and Paraiba do Sul rivers. The study includes the thermal power plants existent on the same geographical region. Some obtained results such as capacity factors and energy generation values are analysed. Some considerations are made on questions referring to the Brazilian energetic problems.

  7. Development of a Pediatric Fall Risk And Injury Reduction Program.

    Science.gov (United States)

    Kramlich, Debra L; Dende, Denise

    2016-01-01

    Fall prevention programs that include reliable, valid, and clinically tested screening tools have demonstrated more positive effects for adult and geriatric populations than those not including such assessment. In contrast, because falling is a natural part of growth and development for pediatric patients, progression toward effective prevention programs for this population has proven to be a challenge; a significant impediment is the lack of definition regarding what constitutes a reportable fall. This project explored pediatric health care providers' perceptions of patient falls in order to define a reportable pediatric fall and inform development of a prevention program. A concept analysis of defining attributes, antecedents, and consequences of pediatric falls from literature formed the basis for a set of questions; a convenience sample of 28 pediatric health care providers in an acute care hospital in New England participated in six moderated focus groups. Constant comparison method was used to code the qualitative data and develop themes. Participants unanimously agreed on several points; as expected, their years of experience in pediatric practice provided valuable insight. Three major themes emerged: patient characteristics, caregiver characteristics, and environmental characteristics. Based on factors identified by staff, a screening tool was adopted and integrated into the electronic medical record. Staff were actively engaged in developing definitions, selecting tools, and identifying next steps toward a comprehensive fall reduction program for their patients. As a result, they have embraced changes and advocated successfully for endorsement by the organization.

  8. Summary of the New England conference on legal and institutional incentives to small-scale hydroelectric development (Boston Massachusetts, January 30-31, 1979)

    Energy Technology Data Exchange (ETDEWEB)

    1980-05-01

    The New England Conference on Legal and Institutional Incentives to Small Scale Hydroelectric Development examined the legal and institutional problems confronting small-scale hydroelectric potential of the northeast. Representatives from DOE, FERC, state legislatures, state public service commissions, private developers, and environmental groups attempted to evaluate the state of hydroelectric development in New England. The meeting began with an introductory panel followed by workshops addressing four topics: Federal regulatory systems, state regulatory systems, the economics of small-scale hydroelectric development, and systems dynamics and the systems dynamics model. Comments by the Honorable Georgiana H. Sheldon, FERC, are presented.

  9. How Can Older Adults Prevent Falls?

    Science.gov (United States)

    ... Talk to your doctor about whether you have osteoporosis. Read More "Preventing Falls" Articles Preventing Falls / Great Help for Older Adults / How Can Older Adults Prevent Falls? / Home Improvements ...

  10. Preventing Falls: Great Help for Older Americans

    Science.gov (United States)

    ... of this page please turn JavaScript on. Feature: Falls and Older Adults Great Help for Older Americans ... on National Pepper Center website. Read More "Preventing Falls" Articles Preventing Falls / Great Help for Older Adults / ...

  11. Falls Among Older Adults: An Overview

    Science.gov (United States)

    ... health care providers. Learn More Important Facts about Falls Recommend on Facebook Tweet Share Compartir Each year, ... once doubles your chances of falling again. 2 Falls Are Serious and Costly One out of five ...

  12. Implantation of hydroelectric power plants and the environmental licensing: the importance of the articulation among the electrical and environment sectors in Brazil; A implantacao de usinas hidreletricas e o processo de licenciamento ambiental: a importancia da articulacao entre os setores eletrico e de meio ambiente no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Facuri, Micheline Ferreira

    2004-07-01

    Hydroelectric power plants stand for the main generation source in Brazil. The basis of the national generator park installed capacity is the exploration of hydraulic potency when the Brazilian energetic die is observed. The atmosphere that the Brazilian electric sector is found now asks for new generator units. In this sense, it would decrease energy offer deficit risk, which collaborates to the electric energy offer expansion effort. This research aims to join and to comment on a group of data and information regarding to the process of implantation of hydroelectric power plants already bid. It includes up to date data on hydroelectric power plants bid since 1996. This data describe the main implications found in the enterprises that are late in their schedules. It shows that the greater the environmental management instruments incorporation in hydroelectric projects planning process, the greater the possibility of new hydraulic generation enterprises with better quality of environmental studies implantation. In this way, it makes even better the process of environmental licensing that could occur in a more adequate deadline. As a result, 28 - out of 54 - enterprises bid are found with environmental problems, which represent 43.30% of bestowed potency. It is possible to infer, thus, that there is a need of more interaction between the electric and the environmental sectors. After analyzing the results, it is concluded that the generation enterprises environmental licensing has been worrying the electric sector agents. This happens due to the need of refinement on environmental studies or due to the need of bureaucracy to get licenses - mainly regarding to judicial actions and environmental issues. Finally, the adequate identification of environmental licensing drags allows a more efficient process to hydroelectric power plants implantation, which generates more consistent and faster results. (author)

  13. Malaria and water resource development: the case of Gilgel-Gibe hydroelectric dam in Ethiopia

    Directory of Open Access Journals (Sweden)

    Kloos Helmut

    2009-01-01

    Full Text Available Abstract Background Ethiopia plans to increase its electricity power supply by five-fold over the next five years to fulfill the needs of its people and support the economic growth based on large hydropower dams. Building large dams for hydropower generation may increase the transmission of malaria since they transform ecosystems and create new vector breeding habitats. The aim of this study was to assess the effects of Gilgel-Gibe hydroelectric dam in Ethiopia on malaria transmission and changing levels of prevalence in children. Methods A cross-sectional, community-based study was carried out between October and December 2005 in Jimma Zone, south-western Ethiopia, among children under 10 years of age living in three 'at-risk' villages (within 3 km from dam and three 'control' villages (5 to 8 km from dam. The man-made Gilgel-Gibe dam is operating since 2004. Households with children less than 10 years of age were selected and children from the selected households were sampled from all the six villages. This included 1,081 children from 'at-risk' villages and 774 children from 'control' villages. Blood samples collected from children using finger prick were examined microscopically to determine malaria prevalence, density of parasitaemia and identify malarial parasite species. Results Overall 1,855 children (905 girls and 950 boys were surveyed. A total of 194 (10.5% children were positive for malaria, of which, 117 (60.3% for Plasmodium vivax, 76 (39.2% for Plasmodium falciparum and one (0.5% for both P. vivax and P. falciparum. A multivariate design-based analysis indicated that, while controlling for age, sex and time of data collection, children who resided in 'at-risk' villages close to the dam were more likely to have P. vivax infection than children who resided farther away (odds ratio (OR = 1.63, 95% CI = 1.15, 2.32 and showed a higher OR to have P. falciparum infection than children who resided in 'control' villages, but this was not

  14. The worldwide relevance of hydroelectric power; L'importanza dell'energia idroelettrica a livello mondiale

    Energy Technology Data Exchange (ETDEWEB)

    Romer, A.

    2004-07-01

    This article reviews the present status of hydroelectric power in the world, assesses its future development and the importance it will have in the future. Mainly the demographic pressure and economical development in the developing countries are going to inevitably increase the worldwide energy demand. For example, it is predicted that electric power demand will double in the next 30 years. In order to minimize the environmental impact of energy consumption increase, like, e.g., climate change induced by fossil fuel use, it is essential to make the best possible use of clean renewable energy sources such as hydroelectric power. Hydroelectric power is the clean energy source with currently the largest development potential. While the present annual world production is 2,600 TWh, the technically feasible potential of hydro power is estimated to 13,000 TWh/year with an estimated 8,000 TWh/year considered to be economically viable. Most of the almost unexploited resources are in Africa, Asia and South America. This article also points to the positive socio-economic impact of construction and operation of hydroelectric power plants in those continents. Graphics and tables give various figures on the geographic distribution of hydroelectric resources in different countries and continents.

  15. Optimization of the weekly operation of a multipurpose hydroelectric development, including a pumped storage plant

    Energy Technology Data Exchange (ETDEWEB)

    Popa, R; Popa, B [Faculty of Power Engineering, University Politehnica of Bucharest, 313 Spl. Independentei, sect. 6, Bucharest, 060042 (Romania); Popa, F [Institute for Hydropower Studies and Design, 5-7 Vasile Lascar, sect. 2, Bucharest, 020491 (Romania); Zachia-Zlatea, D, E-mail: bogdan.popa@rosha.r [Hidroelectrica S.A., 3 Constantin Nacu, sect. 2, Bucharest, 020995 (Romania)

    2010-08-15

    It is presented an optimization model based on genetic algorithms for the operation of a multipurpose hydroelectric power development consisting in a pumped storage plant (PSP) with weekly operation cycle. The lower reservoir of the PSP is supplied upstream from a peak hydropower plant (HPP) with a large reservoir and supplies the own HPP which provides the required discharges towards downstream. Under these conditions, the optimum operation of the assembly consisting in 3 reservoirs and hydropower plants becomes a difficult problem if there are considered the restrictions as regards: the gradients allowed for the reservoirs filling/emptying, compliance with of a long-term policy of the upper reservoir from the hydroelectric development and of the weekly cycle for the PSP upper reservoir, correspondence between the power output/consumption in the weekly load schedule, turning to account of the water resource at maximum overall efficiencies, etc. Maximization of the net energy value (generated minus consumed) was selected as performance function of the model, considering the differentiated price of the electric energy over the week (working or weekend days, peak, half-peak or base hours). The analysis time step was required to be of 3 hours, resulting a weekly horizon of 56 steps and 168 decision variables, respectively, for the 3 HPPs of the system. These were allowed to be the flows turbined at the HPP and the number of working hydrounits at PSP, on each time step. The numerical application has considered the guiding data of Fantanele-Tarnita-Lapustesti hydroelectric development. Results of various simulations carried out proved the qualities of the proposed optimization model, which will allow its use within a decisional support program for such a development.

  16. Rapid green synthesis of ZnO nanoparticles using a hydroelectric cell without an electrolyte

    Science.gov (United States)

    Shah, Jyoti; Kumar Kotnala, Ravinder

    2017-09-01

    In this study, zinc oxide (ZnO) nanoparticles were synthesized using a novel environmentally friendly hydroelectric cell without an electrolyte or external current source. The hydroelectric cell comprised a nanoporous Li substituted magnesium ferrite pellet in contact with two electrodes, with zinc as the anode and silver as an inert cathode. The surface unsaturated cations and oxygen vacancies in the nanoporous ferrite dissociated water molecules into hydronium and hydroxide ions when the hydroelectric cell was dipped into deionized water. Hydroxide ions migrated toward the zinc electrode to form zinc hydroxide and the hydronium ions were evolved as H2 gas at the silver electrode. The zinc hydroxide collected as anode mud was converted into ZnO nanoparticles by heating at 250 °C. Structural analysis using Raman spectroscopy indicated the good crystallinity of the ZnO nanoparticles according to the presence of a high intensity E2-(high) mode. The nanoparticle size distribution was 5-20 nm according to high resolution transmission electron microscopy. An indirect band gap of 2.75 eV was determined based on the Tauc plot, which indicated the existence of an interstitial cation level in ZnO. Near band edge and blue emissions were detected in photoluminescence spectral studies. The blue emissions obtained from the ZnO nanoparticles could potentially have applications in blue lasers and LEDs. The ZnO nanoparticles synthesized using this method had a high dielectric constant value of 5 at a frequency of 1 MHz, which could be useful for fabricating nano-oscillators. This facile, clean, and cost-effective method obtained a significant yield of 0.017 g for ZnO nanoparticles without applying an external current source.

  17. Optimization of the weekly operation of a multipurpose hydroelectric development, including a pumped storage plant

    Science.gov (United States)

    Popa, R.; Popa, F.; Popa, B.; Zachia-Zlatea, D.

    2010-08-01

    It is presented an optimization model based on genetic algorithms for the operation of a multipurpose hydroelectric power development consisting in a pumped storage plant (PSP) with weekly operation cycle. The lower reservoir of the PSP is supplied upstream from a peak hydropower plant (HPP) with a large reservoir and supplies the own HPP which provides the required discharges towards downstream. Under these conditions, the optimum operation of the assembly consisting in 3 reservoirs and hydropower plants becomes a difficult problem if there are considered the restrictions as regards: the gradients allowed for the reservoirs filling/emptying, compliance with of a long-term policy of the upper reservoir from the hydroelectric development and of the weekly cycle for the PSP upper reservoir, correspondence between the power output/consumption in the weekly load schedule, turning to account of the water resource at maximum overall efficiencies, etc. Maximization of the net energy value (generated minus consumed) was selected as performance function of the model, considering the differentiated price of the electric energy over the week (working or weekend days, peak, half-peak or base hours). The analysis time step was required to be of 3 hours, resulting a weekly horizon of 56 steps and 168 decision variables, respectively, for the 3 HPPs of the system. These were allowed to be the flows turbined at the HPP and the number of working hydrounits at PSP, on each time step. The numerical application has considered the guiding data of Fantanele-Tarnita-Lapustesti hydroelectric development. Results of various simulations carried out proved the qualities of the proposed optimization model, which will allow its use within a decisional support program for such a development.

  18. Potential effects of hydroelectric dam development in the Mekong River basin on the migration of Siamese mud carp (Henicorhynchus siamensis and H. lobatus elucidated by otolith microchemistry.

    Directory of Open Access Journals (Sweden)

    Michio Fukushima

    Full Text Available The migration of Siamese mud carp (Henicorhynchus siamensis and H. lobatus, two of the most economically important fish species in the Mekong River, was studied using an otolith microchemistry technique. Fish and river water samples were collected in seven regions throughout the whole basin in Thailand, Laos and Cambodia over a 4 year study period. There was coherence between the elements in the ambient water and on the surface of the otoliths, with strontium (Sr and barium (Ba showing the strongest correlation. The partition coefficients were 0.409-0.496 for Sr and 0.055 for Ba. Otolith Sr-Ba profiles indicated extensive synchronized migrations with similar natal origins among individuals within the same region. H. siamensis movement has been severely suppressed in a tributary system where a series of irrigation dams has blocked their migration. H. lobatus collected both below and above the Khone Falls in the mainstream Mekong exhibited statistically different otolith surface elemental signatures but similar core elemental signatures. This result suggests a population originating from a single natal origin but bypassing the waterfalls through a passable side channel where a major hydroelectric dam is planned. The potential effects of damming in the Mekong River are discussed.

  19. Estimation of small-scale hydroelectric power plant costs; Estimacao de custos de PCH

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Afonso Henriques Moreira [MS Consultoria Ltda, Itajuba, MG (Brazil); Universidade Federal de Itajuba (UNIFEI), MG (Brazil); Silva, Benedito Claudio da [IX Consultoria e Representacoes Ltda, Itajuba, MG (Brazil); Universidade Federal de Itajuba (UNIFEI), MG (Brazil); Magalhaes, Ricardo Nogueira [IX Consultoria e Representacoes Ltda, Itajuba, MG (Brazil)

    2010-07-01

    Changes in Brazilian energy scenario through last years such as increase of demand and search for clean and economically feasible renewable energy sources, has stimulated investors to small hydro power plants (SHP) sector. Such characteristics together with several economic incentives, legal and regulatory mechanisms also, have helped and stimulated building of new plants of this kind and have attracted a great number of investors to this sector. Study of costs analysis and feasibility of investments is a study which has been used since long time in SHP business market as several preliminary studies previous to civil project have significant costs which lead us to count with a feasibility analysis from the very beginning of studies, exactly what is suggested in the present methodology. Such feasibility analysis, in the common patterns where basic unit costs of each input remain outstanding, would be very complex due to great difficulty in obtaining information at initial phase of project. In this direction this study brings a contribution for investors as well as for designers of small hydro power plants since it outlines a link between physical and energetic characteristics of small hydro power plant in its total cost. Such link is based in available physical characteristics in initial phase of the project, making possible a previous comparison between arrangements of a central or even the comparison of return of investment between different plants. The resulting benefit being the possibility of choosing centrals with greater economic feasibility disregarding bad undertakings or arrangements with more expressive cost. Final result gives a better delay in return of investment, helps in power, arrangements more optimized and in saving time as well, reducing costs of undertakings. Due to large number of SHP arrangements, we chose for this study the most common in Brazil, plant of medium and large fall, shunting line balance chimney and low pressure conduit. (author)

  20. Surface finishing in hydroelectric power plants; Veredeln von Laufrad-Oberflaechen in Wasserkraftanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Rauch, Marion

    2010-07-01

    Flow optimized high performance surfaces of the rotor disks are prerequisite to reach high conversion efficiencies in hydroelectric power plants. The surface treatment can be performed using cold metal transfer (CMT) arc welding techniques developed by Fronius International GmbH, Wels, Austria. This technique yields significantly improved results with respect to energy, time and material savings compared to MIG welding or thermal spraying. Water-contact components, sealing and sliding surfaces are cladded using high-performance stainless materials. The CMT process is mainly used by Andritz Hydro Ravensburg for cladding purposes.

  1. Legal obstacles and incentives to the development of small scale hydroelectric potential in Michigan

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level is described. The Federal government also exercises extensive regulatory authority in the area. The first obstacle which any developer must confront in Michigan is obtaining the authority to utilize the river bed, banks, and flowing water at a proposed dam site. This involves a determination of ownership of the stream banks and bed, and the manner of obtaining either their title or use; and existing constraints with regard to the use of the water. Michigan follows the riparian theory of water law. The direct regulation; indirect regulation; public utilities regulation; financing; and taxation are discussed.

  2. A probabilistic approach to evaluate the exploitation of the geographic situation of hydroelectric plants

    Energy Technology Data Exchange (ETDEWEB)

    Sant' Anna, Leonardo A.F.P. [EPE (Brazil)], E-mail: leonardo.santanna@epe.gov.br; Sant' Anna, Annibal Parracho [Escola de Engenharia - UFF, Rua Passo da Patria, 156 bl. D sl. 309 Niteroi, RJ 24210-240 (Brazil)], E-mail: tppaps@vm.uff.br

    2008-07-15

    A procedure to evaluate efficiency in the exploitation of the geographic situation of hydroelectric plants is developed here. It is based on the probabilistic composition of criteria. A comparison of 80 plants is carried out, with volume of water flow at the location and transmission rates paid measuring the potential of the geographic situation and installed power and assured energy measuring the employment of such potential. An analysis based on a new index of quality of approximation and a new measure of importance derived from Shapley value is used to select the criteria that enter a second stage of the efficiency evaluation.

  3. A probabilistic approach to evaluate the exploitation of the geographic situation of hydroelectric plants

    Energy Technology Data Exchange (ETDEWEB)

    Sant' Anna, Leonardo A.F.P.; Sant' Anna, Annibal Parracho [Escola de Engenharia - UFF, Rua Passo da Patria, 156 bl. D sl. 309 Niteroi, RJ 24210-240 (Brazil)

    2008-07-15

    A procedure to evaluate efficiency in the exploitation of the geographic situation of hydroelectric plants is developed here. It is based on the probabilistic composition of criteria. A comparison of 80 plants is carried out, with volume of water flow at the location and transmission rates paid measuring the potential of the geographic situation and installed power and assured energy measuring the employment of such potential. An analysis based on a new index of quality of approximation and a new measure of importance derived from Shapley value is used to select the criteria that enter a second stage of the efficiency evaluation. (author)

  4. The Hydroelectric Power of Necaxa and the Mexican Light and Power Co., industrial heritage at risk

    OpenAIRE

    Guzmán, Celina Peña

    2011-01-01

    This work addresses the risks to the industrial heritage of Necaxa hydroelectric complex, built by engineer Frederick Stark Pearson, through the Mexican Light and Power Company Co., in 1903 during the Diaz period. The power plant boosted the industrialization of central Mexico in most of thelast century and led to changes in the minds of the people of the towns in the Sierra Norte of Puebla where the dam was built. After a century of electrification last October 10, 2009, the President of the...

  5. Assessment of high-head turbomachinery for underground pumped hydroelectric storage plants

    Science.gov (United States)

    Tam, S. W.; Frigo, A. A.; Blomquist, C. A.

    Underground pumped hydroelectric storage (UPHS) plants equipped with advanced reversible pump turbines for operating heads from 500 to 1500 m are discussed in terms of cost efficiency. It is found that the use of advanced machinery shifts the minimum UPHS plant cost to the head range 1200-1500 m. The interactive effects of pump-turbine efficiencies and charge/discharge ratios are examined. It is shown that under certain conditions, a pump-turbine option with a higher charge-discharge ratio at the expense of somewhat lower operating efficiency may be desirable.

  6. Catching a Falling Star

    Science.gov (United States)

    2004-07-01

    . Comets are another important source of meteoroids and perhaps the most spectacular. After many visits near the Sun, a comet "dirty-snowball" nucleus of ice and dust decays and fragments, leaving a trail of meteoroids along its orbit. Some "meteoroid streams" cross the earth's orbit and when our planet passes through them, some of these particles will enter the atmosphere. The outcome is a meteor shower - the most famous being the "Perseids" in the month of August [2] and the "Leonids" in November. Thus, although meteors are referred to as "shooting" or "falling stars" in many languages, they are of a very different nature. More information The research presented in this paper is published in the journal Meteoritics and Planetary Science, Vol. 39, Nr. 4, p. 1, 2004 ("Spectroscopic anatomy of a meteor trail cross section with the ESO Very Large Telescope", by P. Jenniskens et al.). Notes [1] The team is composed of Peter Jenniskens (SETI Institute, USA), Emmanuël Jehin (ESO), Remi Cabanac (Pontificia Universidad Catolica de Chile), Christophe Laux (Ecole Centrale de Paris, France), and Iain Boyd (University of Michigan, USA). [2] The maximum of the Perseids is expected on August 12 after sunset and should be easily seen.

  7. Developing the aquatic-coupled reservoir model to simulate carbon dioxide emission from a young boreal hydroelectric reservoir

    Science.gov (United States)

    Kim, Y.; Roulet, N. T.; Strachan, I. B.; Tremblay, A.

    2013-12-01

    We developed a process-based biogeochemical reservoir model, called AF-DNDC (Aquatic-coupled Forest-DNDC), to project carbon (C) flux from water surface of a recently created hydro-electric reservoir that flooded a boreal landscape. The basis of the reservoir model is Forest-DNDC, a biogeochemical model for C and nitrogen cycling in forests and wetlands. AF-DNDC was developed by coupling a lake C model to a flooded version of Forest-DNDC. AF-DNDC includes the C cycling through the aquatic carbon pools, such as DIC (dissolved inorganic C), DOC (dissolved organic C), and planktonic community as well as C exchange between air, water, and sediment. AF-DNDC was used to examine the net change in carbon dioxide (CO2) exchange between the surface and the atmosphere over the first seven years post flooding of the Eastmain-1 reservoir in northern Quebec. With present day climate and environmental conditions, simulated daily CO2 emissions from the flooded forest averaged 1.69 g C m-2 d-1 (range 0 to 20.49), and from the flooded peatland averaged 0.87 g C m-2 d-1 (range 0 to 6.86). Simulated CO2 emissions decreased with the age of reservoir. They were larger than eddy-covariance measured CO2 fluxes from the water surface over flooded forests, but compared well to the eddy-covariance fluxes during the open-water period. The simulated emissions were significantly correlated with the measured fluxes from the flooded forest (r2 = 0.33; p < 0.01) and flooded peatland (r2 = 0.41; p < 0.01). The patterns over the year were similar. AF-DNDC is suitable for use to assess the major changes in CO2 exchange due to the creation of reservoirs in boreal regions.

  8. 75 FR 33239 - Rangeland Allotment Management Planning on the Fall River West and Oglala Geographic Areas, Fall...

    Science.gov (United States)

    2010-06-11

    ... Forest Service Rangeland Allotment Management Planning on the Fall River West and Oglala Geographic Areas..., Forest Service, will prepare an environmental impact statement (EIS) analyzing the management of... Forest Revised Land and Resource Management Plan (Forest Plan). A Notice of Intent (NOI) for this project...

  9. [Accidental falls in the elderly].

    Science.gov (United States)

    Heinimann, Niklas B; Kressig, Reto W

    2014-06-18

    Falls in the elderly are common with consecutive high mortality and morbidity. Recent consecutive data focus on identification and therapy of intrinsic risk factors. Sarcopenia, imbalance and gait disorders represent the major risk factors. Sarcopenia is caused by a disequilibrium of protein synthesis and breakdown, probably in consequence of age-related changes in protein metabolism. Protein supplements in combination with strength training shows the best benefit. Disorders in balance and gait are caused by age-related or pathologic changes in a complex regulation system of gait. The individual fall risk correlates with the gait variability and even increases with bad dual task performance. Activities with high requirements of attention and body awareness are the most effective prevention for falls in the elderly (-50%).

  10. Elderly individuals with increased risk of falls show postural balance impairment

    OpenAIRE

    Oliveira,Márcio Rogério de; Inokuti,Thiago Tadashi; Bispo,Nuno Noronha da Costa; Oliveira,Deise Aparecida de Almeida Pires; Oliveira, Rodrigo Franco de; Silva Jr.,Rubens Alexandre da

    2015-01-01

    Introduction Falls are a serious public health problem. Objective The aim of this study was to evaluate whether elderly individuals with increased risk of falls have a postural balance deficit, evaluated using a force platform during a one-leg stance. Materials and methods The sample consisted of 94 physically independent elderly individuals from the EELO project. The instruments used were the Downton scale, in order to assess the risk as well as the history of falls, and the force platform t...

  11. Report on the renewal of the hydro-electric concessions; Rapport sur le renouvellement des concessions hydroelectriques

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-11-15

    The administrative procedures of the renewable of the hydro-electric concessions in France is a real problem, leading to too long time of the case files examination. This mission aimed to identify the technical and financial criteria on which the decision maker will base his choice to give the concessions renewal. This report exposes the evaluation and the recommendations of the mission. The first part establishes an evaluation of the situation of the hydro-electric concessions and the today renewal procedures. The second part presents a analysis of this situation and the recommendations. The last part brings the conclusions. (A.L.B.)

  12. Falls in Parkinson's disease and Huntington's disease

    NARCIS (Netherlands)

    Grimbergen, Yvette Anna Maria

    2012-01-01

    Falls in Parkinson’s (PD) and Huntington’s disease (HD) are common. 50 % of moderately affected PD patients sustained two or more falls during a prospective follow-up of 6 months. During a 3 month period 40 % of HD patients reported one or more fall. Many falls resulted in minor injuries and 42 % of

  13. Falling: should one blame the heart?

    NARCIS (Netherlands)

    Jansen, S.

    2015-01-01

    Approximately 30% of people aged 65 and older suffer a fall each year; one in five of these falls will lead to significant injury. As the world’s ageing population increases, healthcare costs associated with falls are only expected to rise. It is estimated that over a third of falls may be preventab

  14. Temporal and kinematic variables for real-world falls harvested from lumbar sensors in the elderly population.

    Science.gov (United States)

    Bourke, A K; Klenk, J; Schwickert, L; Aminian, K; Ihlen, E A F; Helbostad, J L; Chiari, L; Becker, C

    2015-01-01

    Automatic fall detection will reduce the consequences of falls in the elderly and promote independent living, ensuring people can confidently live safely at home. Inertial sensor technology can distinguish falls from normal activities. However, fall data recorded from elderly people in real life. The FARSEEING project has compiled a database of real life falls from elderly people, to gain new knowledge about fall events. We have extracted temporal and kinematic parameters to further improve the development of fall detection algorithms. A total of 100 real-world falls were analysed. Subjects with a known fall history were recruited, inertial sensors were attached to L5 and a fall report, following a fall, was used to extract the fall signal. This data-set was examined, and variables were extracted that include upper and lower impact peak values, posture angle change during the fall and time of occurrence. These extracted parameters, can be used to inform the design of fall-detection algorithms for real-world falls detection in the elderly.

  15. Falls prevention for the elderly.

    Science.gov (United States)

    Balzer, Katrin; Bremer, Martina; Schramm, Susanne; Lühmann, Dagmar; Raspe, Heiner

    2012-01-01

    An ageing population, a growing prevalence of chronic diseases and limited financial resources for health care underpin the importance of prevention of disabling health disorders and care dependency in the elderly. A wide variety of measures is generally available for the prevention of falls and fall-related injuries. The spectrum ranges from diagnostic procedures for identifying individuals at risk of falling to complex interventions for the removal or reduction of identified risk factors. However, the clinical and economic effectiveness of the majority of recommended strategies for fall prevention is unclear. Against this background, the literature analyses in this HTA report aim to support decision-making for effective and efficient fall prevention. The pivotal research question addresses the effectiveness of single interventions and complex programmes for the prevention of falls and fall-related injuries. The target population are the elderly (> 60 years), living in their own housing or in long term care facilities. Further research questions refer to the cost-effectiveness of fall prevention measures, and their ethical, social and legal implications. Systematic literature searches were performed in 31 databases covering the publication period from January 2003 to January 2010. While the effectiveness of interventions is solely assessed on the basis of randomised controlled trials (RCT), the assessment of the effectiveness of diagnostic procedures also considers prospective accuracy studies. In order to clarify social, ethical and legal aspects all studies deemed relevant with regard to content were taken into consideration, irrespective of their study design. Study selection and critical appraisal were conducted by two independent assessors. Due to clinical heterogeneity of the studies no meta-analyses were performed. Out of 12,000 references retrieved by literature searches, 184 meet the inclusion criteria. However, to a variable degree the validity of their

  16. Falls prevention for the elderly

    Directory of Open Access Journals (Sweden)

    Dagmar Lühmann

    2012-04-01

    Full Text Available Background: An ageing population, a growing prevalence of chronic diseases and limited financial resources for health care underpin the importance of prevention of disabling health disorders and care dependency in the elderly. A wide variety of measures is generally available for the prevention of falls and fall-related injuries. The spectrum ranges from diagnostic procedures for identifying individuals at risk of falling to complex interventions for the removal or reduction of identified risk factors. However, the clinical and economic effectiveness of the majority of recommended strategies for fall prevention is unclear. Against this background, the literature analyses in this HTA report aim to support decision-making for effective and efficient fall prevention.Research questions: The pivotal research question addresses the effectiveness of single interventions and complex programmes for the prevention of falls and fall-related injuries. The target population are the elderly (> 60 years, living in their own housing or in long term care facilities. Further research questions refer to the cost-effectiveness of fall prevention measures, and their ethical, social and legal implications. Methods: Systematic literature searches were performed in 31 databases covering the publication period from January 2003 to January 2010. While the effectiveness of interventions is solely assessed on the basis of randomised controlled trials (RCT, the assessment of the effectiveness of diagnostic procedures also considers prospective accuracy studies. In order to clarify social, ethical and legal aspects all studies deemed relevant with regard to content were taken into consideration, irrespective of their study design. Study selection and critical appraisal were conducted by two independent assessors. Due to clinical heterogeneity of the studies no meta-analyses were performed.Results: Out of 12,000 references retrieved by literature searches, 184 meet the

  17. Impact of the reservoir of Paraibuna Hydroelectric Power Plant, SP, Brazil

    Directory of Open Access Journals (Sweden)

    Suely Franco Siqueira Lima

    2010-12-01

    Full Text Available Artificial reservoirs for hydroelectric power plants cause significant environment and social changes. This paper describes the construction of a geospatial database with information on the impacts caused by the Paraibuna hydroelectric power plant since its construction. CBERS-2 and Landsat 5 and 7 images were included in the database, and then, analyzed to provide information on land cover and land use for a period of 31 years. Information provided by São Paulo Energy Company (CESP and the Paraíba do Sul Water Basin Management Association (AGEVAP was integrated into this database. Interactive database queries allow the assessment of changes in the local economy around the reservoir, changes in land cover, loss of historical and environmental assets and also the actions of the energy company to minimize the plant and reservoir impacts. This database provides information that helps analyzing the potential and limits of Paraibuna Power Plant and addresses the impacts to the natural landscape and to the social and economic resources of the affected region.

  18. Hydrologic Simulations Driven by Satellite Rainfall to Study the Hydroelectric Development Impacts on River Flow

    Directory of Open Access Journals (Sweden)

    Tuan B. Le

    2014-11-01

    Full Text Available This study assesses the impact of hydroelectric dams on the discharge and total suspended solids (TSS concentration in the Huong River basin in Vietnam. The analysis is based on hydrologic and sediment transport simulations by the Soil and Water Assessment Tool (SWAT model driven by the Tropical Rainfall Measuring Mission (TRMM 3B42V6 rainfall data, from January 2003 through December 2010. An upstream sub-basin not affected by the hydroelectric dams was used for model calibration. The calibration results indicate good agreement between simulated and observed daily data (0.67 Nash-Sutcliffe efficiency, 0.82 Pearson correlation coefficient. The calibrated model for discharge and TSS simulation is then applied on another major sub-basin and then the whole Huong River basin. The simulation results indicate that dam operation in 2010 decreased downstream discharge during the rainy season by about 35% and augmented it during the dry season by about 226%. The downstream TSS concentration has decreased due to the dam operation but the total sediment loading increased during the dry season and decreased during the rainy season. On average, the dam construction and operation affected the pattern of discharge more than that of the sediment loading. Results indicate that SWAT, driven by remotely sensed inputs, can reasonably simulate discharge and water quality in ungauged or poorly gauged river basins and can be very useful for water resources assessment and climate change impact studies in such basins.

  19. Enhanced greenhouse gas emission from exposed sediments along a hydroelectric reservoir during an extreme drought event

    Science.gov (United States)

    Jin, Hyojin; Yoon, Tae Kyung; Lee, Seung-Hoon; Kang, Hojeong; Im, Jungho; Park, Ji-Hyung

    2016-12-01

    An active debate has been underway on the magnitude and duration of carbon (C) emissions from hydroelectric reservoirs, yet little attention has been paid to stochastic C emissions from reservoir sediments during extreme climatic events. A rare opportunity for field measurements of CO2 efflux from a hydroelectric reservoir in Korea during an extreme drought event was used to examine how prolonged droughts can affect microbial organic matter processing and the release of CO2, CH4 and N2O from exposed sediments. Chamber measurements of CO2 efflux along an exposed sediment transect, combined with high-frequency continuous sensor measurements of the partial pressure of CO2 (pCO2) in the reservoir surface water, exhibited extraordinary pulses of CO2 from exposed sediments and the turbulent inflowing water in contrast to a small CO2 sink in the main water body of the reservoir and a low efflux of CO2 from the flooded sediment. Significant increases in the production of CO2, CH4 and N2O observed in a laboratory incubation of sediments, together with enhanced activities of phenol oxidase and three hydrolases, indicate a temporary activation of microbial organic matter processing in the drying sediment. The results suggest that drought-triggered pulses of greenhouse gas emission from exposed sediments can offset the C accumulation in reservoir sediments over time scales of years to decades, reversing the trend of declining C emissions from aging reservoirs.

  20. Drought Impacts on Reservoir Storage and Hydro-electricity Production in Southeastern Brazil

    Science.gov (United States)

    Scanlon, B. R.; Melo, D. D.; Yin, L.; Wendland, E.

    2015-12-01

    Brazilian hydroelectric plants (HP) generate ~85% of the total electricity in the country (138 GW). More than half of the number largest reservoirs are located in the Southeast/Midwest region, where ~50% of the population (~100 million) lives. The 2014 drought raised several questions about the resilience of the water sources when several urban centers, including Brazilian's largest metropolis (São Paulo, 20 million people), had their water supply threatened. Such drought also affected reservoirs of hydroelectric plants. This study assesses how the storage and, thus the electricity generation, in 14 of the largest reservoirs were affected by drought events within the past 20 years. We computed the Standardized Precipitation Index (SPI) to identify rainfall anomalies throughout the analyzed period. To evaluate the impacts on surface water, we assessed the changes in total (surface+ subsurface) runoff and soil moisture from Global Land Data Assimilation System (GLDAS) and in Total Water Storage (TWS) from Gravity Recovery and Climate Experiment (GRACE) satellite data. We evaluated the anomalies and significance of the changes in reservoir storage (RS) and electricity generation. The results show that severe dry years (-1.5 enhance drought resilience in the future.

  1. Legal obstacles and incentives to the development of small scale hydroelectric power in Delaware

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. In Delaware, a watercourse is not to be confused with surface water. Each gives rise to certain riparian rights, but the law makes certain distinctions between the two. The presence of both surface waters and watercourses give rise to private and public rights related to the presence of the water. Some of these rights are vested in riparian owners. Recent Delaware case law has described the riparian owner as one who owns land on the bank of a river, or who is owner of land along, bordering upon, bounded by, fronting upon, abutting, or adjacent and contiguous to and in contact with a river. But, ownership of the bank does not give the riparian ownership of the water. Some law cases are cited to discuss the laws in Delaware.

  2. Legal obstacles and incentives to the development of small scale hydroelectric power in Maryland

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in Maryland are described. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system is examined with the aim of creating a more orderly understanding of the vagaries of the system, focusing on the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC. In Maryland, by common law rule, title to all navigable waters and to the soil below the high-water mark of those waters is vested in the state as successor to the Lord Proprietary who had received it by grant from the Crown. Rights to non-navigable water, public trust doctrine, and eminent domain are also discussed. Direct and indirect regulations, continuing obligations, loan programs, and regional organizations are described in additional sections.

  3. A model for the data extrapolation of greenhouse gas emissions in the Brazilian hydroelectric system

    Science.gov (United States)

    Pinguelli Rosa, Luiz; Aurélio dos Santos, Marco; Gesteira, Claudio; Elias Xavier, Adilson

    2016-06-01

    Hydropower reservoirs are artificial water systems and comprise a small proportion of the Earth’s continental territory. However, they play an important role in the aquatic biogeochemistry and may affect the environment negatively. Since the 90s, as a result of research on organic matter decay in manmade flooded areas, some reports have associated greenhouse gas emissions with dam construction. Pioneering work carried out in the early period challenged the view that hydroelectric plants generate completely clean energy. Those estimates suggested that GHG emissions into the atmosphere from some hydroelectric dams may be significant when measured per unit of energy generated and should be compared to GHG emissions from fossil fuels used for power generation. The contribution to global warming of greenhouse gases emitted by hydropower reservoirs is currently the subject of various international discussions and debates. One of the most controversial issues is the extrapolation of data from different sites. In this study, the extrapolation from a site sample where measurements were made to the complete set of 251 reservoirs in Brazil, comprising a total flooded area of 32 485 square kilometers, was derived from the theory of self-organized criticality. We employed a power law for its statistical representation. The present article reviews the data generated at that time in order to demonstrate how, with the help of mathematical tools, we can extrapolate values from one reservoir to another without compromising the reliability of the results.

  4. Influence of the Amazon Hydrological Regime on Eutrophication Indicators of a Hydroelectric Power Plant Reservoir.

    Science.gov (United States)

    Freire, Jean Carlos A; Hauser-Davis, Rachel Ann; da Costa Lobato, Tarcísio; de Morais, Jefferson M; de Oliveira, Terezinha F; F Saraiva, Augusto Cesar

    2017-05-01

    Dam constructions in the Amazon have increased exponentially in the last decades, causing several environmental impacts and serious anthropogenic impacts in certain hydroelectric power plant reservoirs in the region have been identified. The assessment of the trophic status of these reservoirs is of interest to indicate man-made changes in the environment, but must take into account the hydrological cycle of the area. This can be relevant for environmental management actions, aiding in the identification of the ecological status of water bodies. In this context, physico-chemical parameters and eutrophication indicators were determined in a hydroelectric power plant reservoir in the Brazilian Amazon to assess trophic variations during the regional hydrological regime phases on the reservoir, namely dry, filling, full and emptying stages. The local hydrological regimes were shown to significantly influence TSS and turbidity, as well as NH4, NO3, PO4, with higher values consistently observed during the filling stage of the reservoir. In addition, differences among the sampling stations regarding land use, population and anthropogenic activities were reflected in the PO4(3-) values during the different hydrological phases.

  5. The development of advanced hydroelectric turbines to improve fish passage survival

    Energy Technology Data Exchange (ETDEWEB)

    Cada, Glenn F. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2001-09-01

    Recent efforts to improve the survival of hydroelectric turbine-passed juvenile fish have explored modifications to both operation and design of the turbines. Much of this research is being carried out by power producers in the Columbia River basin (U.S. Army Corps of Engineers and the public utility districts), while the development of low impact turbines is being pursued on a national scale by the U.S. Department of Energy. Fisheries managers are involved in all aspects of these efforts. Advanced versions of conventional Kaplan turbines are being installed and tested in the Columbia River basin, and a pilot scale version of a novel turbine concept is undergoing laboratory testing. Field studies in the last few years have shown that improvements in the design of conventional turbines have increased the survival of juvenile fish. There is still much to be learned about the causes and extent of injuries in the turbine system (including the draft tube and tailrace), as well as the significance of indirect mortality and the effects of turbine passage on adult fish. However, improvements in turbine design and operation, as well as new field, laboratory, and modeling techniques to assess turbine-passage survival, are contributing toward resolution of the downstream fish passage issue at hydroelectric power plants.

  6. Fish mercury increase in Lago Manso, a new hydroelectric reservoir in tropical Brazil.

    Science.gov (United States)

    Hylander, Lars D; Gröhn, Janina; Tropp, Magdalena; Vikström, Anna; Wolpher, Henriette; de Castro E Silva, Edinaldo; Meili, Markus; Oliveira, Lázaro J

    2006-10-01

    It has been frequently demonstrated that mercury (Hg) concentrations in fish rise in newly constructed hydroelectric reservoirs in the Northern Hemisphere. In the present work, we studied whether similar effects take place also in a tropical upland reservoir during impoundment and discuss possible causes and implications. Total Hg concentrations in fish and several soil and water parameters were determined before and after flooding at Rio Manso hydroelectric power plant in western Brazil. The Hg concentrations in soil and sediment were within the background levels in the region (22-35 ng g(-1) dry weight). There was a strong positive correlation between Hg and carbon and sulphur in sediment. Predatory fish had total Hg concentrations ranging between 70 and 210 ng g(-1) f.w. 7 years before flooding and between 72 and 755 ng g(-1) f.w. during flooding, but increased to between 216 and 938 ng g(-1) f.w. in the piscivorous and carnivorous species Pseudoplatystoma fasciatum, cachara, and Salminus brasiliensis, dourado, 3 years after flooding. At the same time, concentrations of organic carbon in the water increased and oxygen concentrations decreased, indicating increased decomposition and anoxia as contributing to the increased Hg concentrations in fish. The present fish Hg concentrations in commonly consumed piscivorous species are a threat to the health of the population dependent on fishing in the dam and downstream river for sustenance. Mercury exposure can be reduced by following fish consumption recommendations until fish Hg concentrations decrease to a safe level.

  7. Open system architecture for condition based maintenance applied to a hydroelectric power plant

    Energy Technology Data Exchange (ETDEWEB)

    Amaya, E.J.; Alvares, A.J. [University of Brasilia (UnB), DF (Brazil). Mechanical and Mechatronic Dept.], Emails: eamaya@unb.br, alvares@AlvaresTech.com; Gudwin, R.R. [State University of Campinas (UNICAMP), SP (Brazil). Computer Engineering and Industrial Automation Dept.], E-mail: gudwin@dca.fee.unicamp.br

    2009-07-01

    The hydroelectric power plant of Balbina is implementing a condition based maintenance system applying an open, modular and scalable integrated architecture to provide comprehensive solutions and support to the end users like operational and maintenance team. The system called SIMPREBAL (Predictive Maintenance System of Balbina) is advocate of open standards, in particular through collaborative research programmers. In the developing is clearly understands the need for both, industry standards and a simple to use software development tool chain, supporting the development of complex condition based maintenance systems with multiple partners. The Open System Architecture for Condition Based Maintenance (OSA-CBM) is a standard that consider seven hierarchic layers that represent a logic transition or performed data flow from the data acquisition layer, through the intermediates layers as signal processing, condition monitor, health assessment, prognostics and decision support, to arrive to the presentation layer. SIMPREBAL is being implementing as an OSA-CBM software framework and tool set that allows the creation of truly integrated, comprehensive maintenance solutions through the internet. This paper identifies specific benefits of the application of the OSA-CBM in comprehensive solutions of condition based maintenance for a hydroelectric power plant. (author)

  8. Chinua Achebe's Things Fall Apart:

    African Journals Online (AJOL)

    Chinua Achebe's famous novel, Things Fall Apart (TFA), is an extended reductio ad .... Okonkwo's “whole life was dominated by fear, the fear of failure and of weakness. ..... tural ideals and values characteristic of civilized societies on common ...

  9. Fall Armyworm in the Southeast

    Science.gov (United States)

    Two separate experiments testing fall armyworm (Spodoptera frugiperda) migration patterns were set up in the southeastern U.S. in 2012. Previous results showed that moths from progeny of overwintering populations from south Texas were found west of the Chattahoochee-Flint-Apalachicola river basin, ...

  10. Student Transfer Matrix, Fall 1992.

    Science.gov (United States)

    Oklahoma State Regents for Higher Education, Oklahoma City.

    Comprised primarily of data matrices, this report provides information on students transferring from Oklahoma public and private post-secondary institutions to other public and private post-secondary institutions in the state in fall 1992. The report consists of nine sections. Section I provides an aggregate flow of all students in the state,…

  11. Finding Rising and Falling Words

    NARCIS (Netherlands)

    Tjong Kim Sang, E.

    2016-01-01

    We examine two different methods for finding rising words (among which neologisms) and falling words (among which archaisms) in decades of magazine texts (millions of words) and in years of tweets (billions of words): one based on correlation coefficients of relative frequencies and time, and one

  12. [Violence Profiles for Fall Programming.

    Science.gov (United States)

    National Citizens Committee for Broadcasting, Washington, DC.

    This document presented by the National Citizens' Committee for Broadcasting at a 1976 press conference provides an assortment of materials concerned with violence in television. Among the materials included are "Who Sponsors the New Fall Violence?" by Nicholas Johnson, a description of and rationale for the study of advertisers who sponsor…

  13. NOVA Fall 2000 Teacher's Guide.

    Science.gov (United States)

    Ransick, Kristina; Rosene, Dale; Sammons, Fran Lyons; Sammons, James

    This teacher's guide complements six programs that aired on the Public Broadcasting System (PBS) in the fall of 2000. Programs include: (1) "Lincoln's Secret Weapon"; (2) "Hitler's Lost Sub"; (3) "Runaway Universe"; (4) "Garden of Eden"; (5) "Dying to Be Thin"; and (6) "Japan's Secret…

  14. Person-Centered Fall Risk Awareness Perspectives: Clinical Correlates and Fall Risk.

    Science.gov (United States)

    Verghese, Joe

    2016-12-01

    To identify clinical correlates of person-centered fall risk awareness and their validity for predicting falls. Prospective cohort study. Community. Ambulatory community-dwelling older adults without dementia (N = 316; mean age 78, 55% female). Fall risk awareness was assessed using a two-item questionnaire that asked participants about overall likelihood of someone in their age group having a fall and their own personal risk of falling over the next 12 months. Incident falls were recorded over study follow-up. Fifty-three participants (16.8%) responded positively to the first fall risk awareness question about being likely to have a fall in the next 12 months, and 100 (31.6%) reported being at personal risk of falling over the next 12 months. There was only fair correlation (κ = 0.370) between responses on the two questions. Prior falls and depressive symptoms were associated with positive responses on both fall risk awareness questions. Age and other established fall risk factors were not associated with responses on either fall risk awareness question. The fall risk awareness questionnaire did not predict incident falls or injurious falls. Fall risk awareness is low in older adults. Although person-centered fall risk awareness is not predictive of falls, subjective risk perceptions should be considered when designing fall preventive strategies because they may influence participation and behaviors. © 2016, Copyright the Author Journal compilation © 2016, The American Geriatrics Society.

  15. Watch Out for Falling Plasma

    Science.gov (United States)

    Kohler, Susanna

    2016-12-01

    The path taken by the falling fragment in the June 2011 event. [Adapted from Petralia et al. 2016]Sometimes plasma emitted from the Sun doesnt escape into space, but instead comes crashing back down to the solar surface. What can observations and models of this process tell us about how the plasma falls and the local conditions on the Sun?Fallback from a FlareOn 7 June 2011, an M-class flare erupted from the solar surface. As the Solar Dynamics Observatorys Atmospheric Imaging Assembly looked on, plasma fragments from the flare arced away from the Sun and then fell back to the surface.Some fragments fell back where the Suns magnetic field was weak, returning directly to the surface. But others fell within active regions, where they crashed into the Suns magnetic field lines, brightening the channels and funneling along them through the dense corona and back to the Suns surface.The authors model of the falling blobs at several different times in their simulation. The blobs get disrupted when they encounter the field lines, and are then funneled along the channels to the solar surface. [Adapted from Petralia et al. 2016]This sort of flare and fall-back event is a common occurrence with the Sun, and SDOs observations of the June 2011 event present an excellent opportunity to understand the process better. A team of scientists led by Antonino Petralia (University of Palermo, Italy and INAF-OAPA) modeled this event in an effort to learn more about how the falling plasma interacts with strong magnetic fields above the solar surface.Magnetic Fields as GuidesPetralia and collaborators used three-dimensional magnetohydrodynamical modeling to attempt to reproduce the observations of this event. They simulated blobs of plasma as they fall back to the solar surface and interact with magnetic field lines over a range of different conditions.The team found that only simulations that assume a relatively strong magnetic field resulted in the blobs funneling along a channel to the

  16. Rural electrification in Santarem: contribution of micro hydroelectric power plants; Eletrificacao rural em Santarem: contribuicao das micro centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Els, Rudi Henri Van; Diniz, Janaina Deane De Abreu Sa; Souza, Josiane do Socorro Aguiar de; Brasil Junior, Antonio Cesar Pinho; Sousa, Antonio Nazareno Almada de [Universidade de Barsilia (UnB), DF (Brazil). Lab. de Energia e Ambiente; Kroetz, Jaemir Grasiel [Indalma Industria e Comercio, Santarem, PA (Brazil)

    2010-07-01

    The municipality of Santarem in the lower Amazon river is the main center in the western region of the state of Para with a population of 274.285 inhabitants, with 31.633 of them living in the rural zone, where only 1.060 rural costumers have access to regular electricity service from the utility provider. This incipient coverage of electricity service in the rural zone urged the local population to look for alternatives. This was found in the use of the hydraulic potential of creeks and rivers with rapids and waterfalls to implement pico and micro hydroelectric plants. So since 2001, 44 pico and 12 micro hydropower plants were installed in the municipalities of Santarem, Belterra and Uruara in the state of Para by local entrepreneurs and communities to attend their basic electricity needs. These systems attend approximately 580 families with a total installed capacity of more than 700 kVA. The consolidation of this technological alternative induced the Regional Superintendent of the Institute for Colonization and Land Reform (INCRA) and the Municipality of Santarem to elaborate a project to attend the land reform settlements in the region. This led to the installation of 6 micro hydropower (MHP) with a total installed capacity of 820kVA and a 252 km distribution network to attend 1.630 families in the settlements of Moju and Corta Corda. The purpose of this paper is to present the MHP's installed in the region and to show the contribution of these units in the rural electrification of rural settlements in Santarem. The paper discusses also the management model of these units. The survey's methodology consisted in the systematization of project data from the plant builder, INCRA and the municipality. The information was obtained from the official bibliography from the local actors and complemented by field surveys with interviews and observation. Despite the fact that the MHP's are in operation, they are not yet registered in the data base of the

  17. 25 YEARS EXPERIENCES OF CHINA MADE SMALL HYDROELECTRIC UNITS WITH USA MADE DIGITAL TECHNOLOGY INSTALLED IN USA AND CENTRAL AMERICA

    Institute of Scientific and Technical Information of China (English)

    DR.ALEXANDERA

    2005-01-01

    Twenty-five years ago America's small hydroelectric power generations were reactivated by private, municipal, and local governments to utilize the renewable energy from the small hydro sties available 10,000 existing dams, small rivers and/or streams, and energy recovery facilities at many water transmission and delivery systems.

  18. Changes in soil organic matter compositrion after introduction of riparian vegetation on shores of hydroelectric reservoires (Southeast of Brazil)

    NARCIS (Netherlands)

    Alcantara, de F.A.; Buurman, P.; Curi, N.; Furtini Neto, A.E.; Lagen, van B.; Meijer, E.M.

    2004-01-01

    This work is part of a research program with the general objective of evaluating soil sustainability in areas surrounding hydroelectric reservoirs, which have been planted with riparian forest. The specific aims were: (i) to assess if and how the soil organic matter (SOM) chemical composition has ch

  19. 75 FR 75999 - Lock + Hydro Friends Fund XlVI; FFP Missouri 17, LLC; Solia 3 Hydroelectric, LLC; Three Rivers...

    Science.gov (United States)

    2010-12-07

    ... 3 Hydroelectric, LLC; Three Rivers Hydro, LLC; Hildebrand Hydro, LLC; Notice of Competing..., and Three Rivers Hydro LLC, and on May 19 Hildebrand Hydro, filed applications, pursuant to section 4... of Engineers (Corps) Hildebrand Lock & Dam located on the Monongahela River in Monongahela...

  20. Accumulated effects on landscape pattern by hydroelectric cascade exploitation in the Yellow River basin from 1977 to 2006

    NARCIS (Netherlands)

    Ouyang, W.; Skidmore, A.K.; Hao, F.H.; Toxopeus, A.G.; Abkar, A.

    2009-01-01

    The accumulated impacts of hydroelectric cascade exploitation (HCE) on the landscape are greater than the simple sum of the impacts from a single dam. The spatial–temporal landscape characteristics resulting from the accumulated impacts of HCE from 1977 to 2006 in Longliu Watershed, a part of the Ye

  1. Accumulated effects on landscape pattern by hydroelectric cascade exploitation in the Yellow River basin from 1977 to 2006

    NARCIS (Netherlands)

    Ouyang, W.; Skidmore, A.K.; Hao, F.H.; Toxopeus, A.G.; Abkar, A.

    2009-01-01

    The accumulated impacts of hydroelectric cascade exploitation (HCE) on the landscape are greater than the simple sum of the impacts from a single dam. The spatial–temporal landscape characteristics resulting from the accumulated impacts of HCE from 1977 to 2006 in Longliu Watershed, a part of the

  2. Hardware Design of the Energy Efficient Fall Detection Device

    Science.gov (United States)

    Skorodumovs, A.; Avots, E.; Hofmanis, J.; Korāts, G.

    2016-04-01

    Health issues for elderly people may lead to different injuries obtained during simple activities of daily living. Potentially the most dangerous are unintentional falls that may be critical or even lethal to some patients due to the heavy injury risk. In the project "Wireless Sensor Systems in Telecare Application for Elderly People", we have developed a robust fall detection algorithm for a wearable wireless sensor. To optimise the algorithm for hardware performance and test it in field, we have designed an accelerometer based wireless fall detector. Our main considerations were: a) functionality - so that the algorithm can be applied to the chosen hardware, and b) power efficiency - so that it can run for a very long time. We have picked and tested the parts, built a prototype, optimised the firmware for lowest consumption, tested the performance and measured the consumption parameters. In this paper, we discuss our design choices and present the results of our work.

  3. Osteoarthritis and falls in the older person.

    Science.gov (United States)

    Ng, Chin Teck; Tan, Maw Pin

    2013-09-01

    Osteoarthritis and falls are common conditions affecting older individuals which are associated with disability and escalating health expenditure. It has been widely assumed that osteoarthritis is an established risk factor for falls in older people. The relationship between osteoarthritis and falls has, quite surprisingly, not been adequately elucidated, and published reports have been conflicting. Our review of the existing literature has found limited evidence supporting the current assumption that the presence of osteoarthritis is associated with increased risk of falls with suggestions that osteoarthritis may actually be protective against falls related fractures. In addition, joint arthroplasty appears to increase the risk of falls in individuals with osteoarthritis.

  4. What Are Ways to Prevent Falls and Related Fractures?

    Science.gov (United States)

    ... Resources Preventing Falls and Fractures Osteoporosis and Falls Osteoporosis and Falls (繁體中文) Partner Resources Falls and Fractures (NIA) Falls and Older Adults (NIH Senior Health) Caídas y fracturas (NIA) Director’s ...

  5. Dynamics of turbulent falling films

    Science.gov (United States)

    O'Naraigh, Lennon; Matar, Omar

    2012-11-01

    The dynamics of laminar falling films have received considerable attention over the past several decades. In contrast, turbulent falling films have been the subject of far fewer studies. We seek to redress this balance by studying the stability of falling films which have already undergone a transition from a laminar to a turbulent flow regime. We derive a uniform-film base-state for this flow by assuming the averaged turbulent velocity field to be steady and fully-developed, and by employing a modified version of mixing-length theory. The latter features an interpolation function for the eddy viscosity, and van Driest-type functions for turbulence-damping near the wall and interface regions. The predicted base-state streamwise velocity component is in good agreement with experimental data. A linear stability analysis of this base-state is then carried out by solving a modified version of the Orr-Sommerfeld equation. Our results suggest that the unstable mode is a long-wave one. This provides motivation for the derivation of long-wave equations for the nonlinear evolution of the film.

  6. Effects of hyporheic exchange flows on egg pocket water temperature in Snake River fall Chinook salmon spawning areas

    Energy Technology Data Exchange (ETDEWEB)

    Hanrahan, T. P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Geist, D. R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Arntzen, E. V. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Abernethy, C. S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2004-09-01

    The development of the Snake River hydroelectric system has affected fall Chinook salmon smolts by shifting their migration timing to a period (mid- to late-summer) when downstream reservoir conditions are unfavorable for survival. Subsequent to the Snake River Chinook salmon fall-run Evolutionary Significant Unit being listed as Threatened under the Endangered Species Act, recovery planning has included changes in hydrosystem operations (e.g., summer flow augmentation) to improve water temperature and flow conditions during the juvenile Chinook salmon summer migration period. In light of the limited water supplies from the Dworshak reservoir for summer flow augmentation, and the associated uncertainties regarding benefits to migrating fall Chinook salmon smolts, additional approaches for improved smolt survival need to be evaluated. This report describes research conducted by the Pacific Northwest National Laboratory (PNNL) that evaluated relationships among river discharge, hyporheic zone characteristics, and egg pocket water temperature in Snake River fall Chinook salmon spawning areas. This was a pilot-scale study to evaluate these relationships under existing operations of Hells Canyon Dam (i.e., without any prescribed manipulations of river discharge) during the 2002–2003 water year.

  7. Ticks (Acari: Ixodidae on wild animals from the Porto-Primavera Hydroelectric power station area, Brazil

    Directory of Open Access Journals (Sweden)

    Marcelo B Labruna

    2002-12-01

    Full Text Available From June 2000 to June 2001, a total of 741 ticks were collected from 51 free-living wild animals captured at the Porto-Primavera Hydroelectric power station area, located alongside an approximately 180 km course of the Paraná river, between the states of São Paulo and Mato Grosso do Sul, comprising 9 species of 3 genera: Ambly-omma (7 species, Boophilus (1 and Anocentor (1. A total of 421 immature Amblyomma ticks were reared in laboratory until the adult stage, allowing identification of the species. A. cajennense was the most frequent tick species (mostly immature stages collected on 9 host species: Myrmecophaga tridactyla, Tamandua tetradactyla,Cerdocyon thous, Puma concolor,Tayassu tajacu, Mazama gouazoubira,Hydrochaeris hydrochaeris,Alouatta caraya, Cebus apella. Other tick species were less common, generally restricted to certain host taxa.

  8. Diversity and activity pattern of wildlife inhabiting catchment of Hulu Terengganu Hydroelectric Dam, Terengganu, Peninsular Malaysia

    Science.gov (United States)

    Adyla, M. N. Nurul; Ikhwan, Z.; Zuhairi, M.; Ngah, Shukor, M. N.

    2016-11-01

    A series of camera trapping surveys were conducted to study the diversity and distribution of wildlife within the catchment of Hulu Terengganu Hydroelectric Dam. A total of 124 camera traps were deployed at nine study sites, continuously from June 2014 until December 2015. The total effort of camera trap surveys from all the study sites during the 18-month sampling period was 29,128 night traps, from which a total of 32 species of wildlife representing nine Orders were recorded. The most common species were Eurasian Wild Pig (Sus scrofa), Barking Deer (Munticus muntjak), and Malayan Tapir (Tapirus indicus). Camera trap data on activity patterns show that Gallus gallus, Muntiacus muntjak and Sus scrofa are diurnal animals, whereas Tapirus indicus, Elephas maximus and Helarctos malayanus are nocturnal animals.

  9. Do Hydroelectric Dams Mitigate Global Warming? The Case of Brazil's Curuna Dam

    Energy Technology Data Exchange (ETDEWEB)

    Fearnside, P.M. [National Institute for Research in the Amazon (INPA), C.P. 478, 69011-970 Manaus, Amazonas (Brazil)

    2005-10-15

    Hydroelectric dams in tropical forest areas emit greenhouse gases, as illustrated by the Curuna dam in the Amazonian portion of Brazil. Emissions include carbon dioxide from decay of the above-water portions of trees that are left standing in the reservoir and methane from soft vegetation that decays under anaerobic conditions on the bottom of the reservoir, especially macrophytes (water weeds) and vegetation that grows in the drawdown zone and is flooded when the reservoir water level rises. Some methane is released from the reservoir surface through bubbling and diffusion, but larger amounts are released from water passing through the turbines and spillway. Methane concentration in the water increases with depth, and the turbines and spillway draw water from sufficient depth to have substantial methane content. In 1990 (13 years after filling), the Curuna Dam emitted 3.6 times more greenhouse gases than would have been emitted by generating the same amount of electricity from oil.

  10. Legal obstacles and incentives to the development of small scale hydroelectric power in Vermont

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in Vermont are discussed. The dual regulatory system involving state and Federal governments is discussed followed by discussions on property interests; direct regulation by the Public Service Board; indirect regulation; and financial considerations. An initial step required of any developer is that of real property acquisition. Ordinarily this involves acquiring the stream bed, land along the stream banks, and land needed for the impoundment reservoir. Ownership of land along the stream banks places the developer in the position of a riparian owner. This status is important in that only riparian owners are entitled to a reasonable use of the flowing water. In addition to acquisition by sale, lease, or gift, Vermont law allows certain developers to acquire property via eminent domain. Some general rules which have evolved as riparian law and applied in Vermont are discussed.

  11. Multi-Model Long-Range Ensemble Forecast for Decision Support in Hydroelectric Operations

    Science.gov (United States)

    Kunkel, M. L.; Parkinson, S.; Blestrud, D.; Holbrook, V. P.

    2014-12-01

    Idaho Power Company (IPC) is a hydroelectric based utility serving over a million customers in southern Idaho and eastern Oregon. Hydropower makes up ~50% of our power generation and accurate predictions of streamflow and precipitation drive our long-term planning and decision support for operations. We investigate the use of a multi-model ensemble approach for mid and long-range streamflow and precipitation forecasts throughout the Snake River Basin. Forecast are prepared using an Idaho Power developed ensemble forecasting technique for 89 locations throughout the Snake River Basin for periods of 3 to 18 months in advance. A series of multivariable linear regression, multivariable non-linear regression and multivariable Kalman filter techniques are combined in an ensemble forecast based upon two data types, historical data (streamflow, precipitation, climate indices [i.e. PDO, ENSO, AO, etc…]) and single value decomposition derived values based upon atmospheric heights and sea surface temperatures.

  12. Watermill and Small-Scale Hydroelectric Power Plant Landscapes Assessed According to Ecological Aspects

    Directory of Open Access Journals (Sweden)

    Lilita Lazdāne

    2013-10-01

    Full Text Available Research of watermill and small-scale hydroelectric power plant (HPP landscapes in Latvia according to ecological aspects is a part of a more complex research. The aim of this research is to examine the existing situation of watermill and small-scale HPP landscapes in Latvia by applying the ecological assessment criteria, and then try to formulate a definition of common tendencies of the landscape character. This paper provides a landscape inventory matrix for research in the field stu­dies of landscape identification at the local planning level. The duration of the research was from 2010 to 2012. The research includes 42 territories starting with the three most densely developed areas in Latvia: in Latgale, Kurzeme and Vidzeme uplands distribution ranges. The research results reflect tendencies of the landscape features assessed according to the previously developed criteria of ecological aspects.

  13. Ticks (Acari: Ixodidae) on wild animals from the Porto-Primavera Hydroelectric power station area, Brazil.

    Science.gov (United States)

    Labruna, Marcelo B; de Paula, Cátia D; Lima, Thiago F; Sana, Dênis A

    2002-12-01

    From June 2000 to June 2001, a total of 741 ticks were collected from 51 free-living wild animals captured at the Porto-Primavera Hydroelectric power station area, located alongside an approximately 180 km course of the Paran river, between the states of S o Paulo and Mato Grosso do Sul, comprising 9 species of 3 genera: Ambly-omma (7 species), Boophilus (1) and Anocentor (1). A total of 421 immature Amblyomma ticks were reared in laboratory until the adult stage, allowing identification of the species. A. cajennense was the most frequent tick species (mostly immature stages) collected on 9 host species: Myrmecophaga tridactyla, Tamandua tetradactyla,Cerdocyon thous, Puma concolor,Tayassu tajacu, Mazama gouazoubira,Hydrochaeris hydrochaeris,Alouatta caraya, Cebus apella. Other tick species were less common, generally restricted to certain host taxa.

  14. Maintenance and operation of a hydroelectric unit of energy in a power system using virtual reality

    Energy Technology Data Exchange (ETDEWEB)

    de Sousa, Marcos Paulo Alves [Federal University of Para, Faculty of Engineering Computing, Augusto Correa Street, No. 1, Belem, Para (Brazil); Emilio Goeldi Museum, Service Data Processing Department, Perimetral Avenue No. 1901, Belem, Para (Brazil); Filho, Manoel Ribeiro; Nunes, Marcus Vinicius Alves; Lopes, Andrey da Costa [Federal University of Para, Faculty of Engineering Computing, Augusto Correa Street, No. 1, Belem, Para (Brazil)

    2010-07-15

    This paper presents a new approach to training for hydroelectric unit of energy (HUE) by using virtual reality Non-immersive techniques. The software offers two modules of training: maintenance and operation. The first module, maintenance, uses the learning approach based on practice and offers different training levels, divided into three modes: automatic, guided, and exploratory, in which these modes are accessed according to the acquired degree of knowledge by the trainee in relation to maintenance procedures. The second module, allows the trainee to visualize the operation of HUE during a certain event as the electromechanical dynamics of the turbine-generator assemblage in the virtual world by the visualization of several requisite conditions before the startup-shutdown procedure of HUE. (author)

  15. A holistic approach towards optimal planning of hybrid renewable energy systems: Combining hydroelectric and wind energy

    Science.gov (United States)

    Dimas, Panagiotis; Bouziotas, Dimitris; Efstratiadis, Andreas; Koutsoyiannis, Demetris

    2014-05-01

    Hydropower with pumped storage is a proven technology with very high efficiency that offers a unique large-scale energy buffer. Energy storage is employed by pumping water upstream to take advantage of the excess of produced energy (e.g. during night) and next retrieving this water to generate hydro-power during demand peaks. Excess energy occurs due to other renewables (wind, solar) whose power fluctuates in an uncontrollable manner. By integrating these with hydroelectric plants with pumped storage facilities we can form autonomous hybrid renewable energy systems. The optimal planning and management thereof requires a holistic approach, where uncertainty is properly represented. In this context, a novel framework is proposed, based on stochastic simulation and optimization. This is tested in an existing hydrosystem of Greece, considering its combined operation with a hypothetical wind power system, for which we seek the optimal design to ensure the most beneficial performance of the overall scheme.

  16. Performance of distributing valves in hydroelectric speed governors: analysis of the influence of the internal geometry

    Energy Technology Data Exchange (ETDEWEB)

    Retzlaff, L.; Pacheco, M.I.; Ferronatto, D.; Negri, V.J. de [Federal University of Santa Catarina (LASHIP/EMC/UFSC), Florianopolis, SC (Brazil). Mechanical Engineering Dept. Lab. of Hydraulic and Pneumatic Systems], E-mail: victor@emc.ufsc.br; Belan, H.C. [Federal Institute of Santa Catarina (IFSC), Chapeco, SC (Brazil). Mechanical Engineering Dept.; Soares, J.M.C. [REIVAX Automacao e Controle, Florianopolis, SC (Brazil)

    2009-07-01

    This paper discusses an analysis of the influence of internal geometric parameters on the performance of distributing valves including the theoretical and experimental analysis of a 3000 Lpm valve which is used in the speed control of a 350 MVA turbine. Using a model that represents the fluid flow through the valve, it is possible to study the influence of the internal geometry, such the orifice area, radial clearances and internal channels, on the behavior of flow rate and pressure. With the validated model, different valve configurations can be evaluated either in the design phase or during the operation and qualification tests. These results could aid both professionals involved in the operation and maintenance of hydroelectric power plants in identifying and tracking any changes in the valves performance and design engineers in the definition of the geometric and dimensional tolerances. (author)

  17. Creating an IOT That Notifies Concerned People for the Falls of Geriatric Patients.

    Science.gov (United States)

    Turkeli, Serkan; Kurt, Kenan Kaan; Catamak, Adem; Sonmez, Remzi Yalin; Atay, Huseyin Tanzer

    2016-01-01

    A fall is a multifactorial phenomenon which cause an increase in both mortality and injury rates. The cause of a fall is mostly related to loss in reflexes especially in older ages. A number of large prospective studies shows that elderly patients have significant fractures and injuries even sometimes in some cases a fall can be concluded with deaths. However, in case of fall, if the situation is noticed and aided quickly, the life quality can be increased significantly in older people. With implementation of preventive strategies or premonitory devices, this devastating problem can be solved. The IOT project is a prototype with two versions which are needled and attached versions and accomplishes basic functions such as information about falls and send it through the internet. By this way, the falls are transmitted to concerned people or patient's relatives with position information.

  18. Associated Factors for Falls, Recurrent Falls, and Injurious Falls in Aged Men Living in Taiwan Veterans Homes

    Directory of Open Access Journals (Sweden)

    Yan-Chiou Ku

    2013-06-01

    Conclusion: This study demonstrated that the advanced age, depression status, stroke, gouty arthritis, and cataract are independent variables for predicting falls; depression is the only clinical factor capable of predicting the recurrent falls. These variables were potential targets for effective prevention of falls.

  19. Integration of Lithium-Ion Battery Storage Systems in Hydroelectric Plants for Supplying Primary Control Reserve

    Directory of Open Access Journals (Sweden)

    Fabio Bignucolo

    2017-01-01

    Full Text Available The ever-growing diffusion of renewables as electrical generation sources is forcing the electrical power system to face new and challenging regulation problems to preserve grid stability. Among these, the primary control reserve is reckoned to be one of the most important issues, since the introduction of generators based on renewable energies and interconnected through static converters, if relieved from the primary reserve contribution, reduces both the system inertia and the available power reserve in case of network events involving frequency perturbations. In this scenario, renewable plants such as hydroelectric run-of-river generators could be required to provide the primary control reserve ancillary service. In this paper, the integration between a multi-unit run-of-river power plant and a lithium-ion based battery storage system is investigated, suitably accounting for the ancillary service characteristics as required by present grid codes. The storage system is studied in terms of maximum economic profitability, taking into account its operating constraints. Dynamic simulations are carried out within the DIgSILENT PowerFactory 2016 software environment in order to analyse the plant response in case of network frequency contingencies, comparing the pure hydroelectric plant with the hybrid one, in which the primary reserve is partially or completely supplied by the storage system. Results confirm that the battery storage system response to frequency perturbations is clearly faster and more accurate during the transient phase compared to a traditional plant, since time delays due to hydraulic and mechanical regulations are overpassed. A case study, based on data from an existing hydropower plant and referring to the Italian context in terms of operational constraints and ancillary service remuneration, is presented.

  20. Model for energy planning of degraded river basins based on hydrological evaluation of hydroelectric reservoirs in operation; Modelo de planejamento energetico de bacias hidrograficas degradadas baseado na avaliacao hidrica de reservatorios hidreletricos em operacao

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Afonso Henriques Moreira [Universidade Federal de Itajuba (UNIFEI), MG (Brazil); Ferreira, Aloisio Caetano; Ottoni, Arthur Benedicto; Nogueira Neto, Claudio; Silva, Denis de Souza

    2008-07-01

    The human occupation of the hydrographic basin, made in the past without plans, generated alteration of the hydrology characteristics, presenting as direct consequence modifications of its hydric availabilities. Or either, the floods in the rainy periods and the droughts in the ones of dryness currently tend to be more frequent and with bigger intensity. These conditions have affected the operation as well as the planning of the hydroelectric reservoirs, that have generated energy in conditions of different hydric availabilities (worse) of those foreseeing at the time of the project. These situations result in uncertainties and energy losses for the investor as well as in the system. Under such premises, the present article analyzes the energy-economic influences of the deterioration of the hydric regimen of some on exploitations in operation to the system, located in basins degrades in the South, Southeastern and Northeast regions; enhancing the importance of the studies of hydric economy of these units of management (degraded basins) as subsidy of taking of decision for gradual recovery of its hydric availabilities; taking in account the energy optimization of the hydroelectric reservoirs in located operation as well as the minimization of inherent the financial losses to the uncertainties of its hydric resources. (author)

  1. A simple strategy for fall events detection

    KAUST Repository

    Harrou, Fouzi

    2017-01-20

    The paper concerns the detection of fall events based on human silhouette shape variations. The detection of fall events is addressed from the statistical point of view as an anomaly detection problem. Specifically, the paper investigates the multivariate exponentially weighted moving average (MEWMA) control chart to detect fall events. Towards this end, a set of ratios for five partial occupancy areas of the human body for each frame are collected and used as the input data to MEWMA chart. The MEWMA fall detection scheme has been successfully applied to two publicly available fall detection databases, the UR fall detection dataset (URFD) and the fall detection dataset (FDD). The monitoring strategy developed was able to provide early alert mechanisms in the event of fall situations.

  2. Falls Prevention: Unique to Older Adults

    Science.gov (United States)

    ... our e-newsletter! Aging & Health A to Z Falls Prevention Unique to Older Adults This section provides ... and Muscle Strengthening Exercises As part of your fall prevention program, you should follow an exercise program ...

  3. Case studies of the legal and institutional obstacles and incentives to the development of small-scale hydroelectric power: Bull Run, Portland, Oregon

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-05-01

    The National Conference of State Legislatures' Small-Scale Hydroelectric Policy Project is designed to assist selected state legislatures in looking at the benefits that a state can derive from the development of small-scale hydro, and in carrying out a review of state laws and regulations that affect the development of the state's small-scale hydro resources. The successful completion of the project should help establish state statutes and regulations that are consistent with the efficient development of small-scale hydro. As part of the project's work with state legislatures, seven case studies of small-scale hydro sites were conducted to provide a general analysis and overview of the significant problems and opportunities for the development of this energy resource. The case study approach was selected to expose the actual difficulties and advantages involved in developing a specific site. Such an examination of real development efforts will clearly reveal the important aspects about small-scale hydro development which could be improved by statutory or regulatory revision. Moreover, the case study format enables the formulation of generalized opportunities for promoting small-scale hydro based on specific development experiences. The case study for small-scale hydro power development at the City of Portland's water reserve in the Bull Run Forest is presented with information included on the Bull Run hydro power potential, current water usage, hydro power regulations and plant licensing, technical and economic aspects of Bull Run project, and the environmental impact. (LCL)

  4. Epidemiology of Falls in Older Age

    Science.gov (United States)

    Peel, Nancye May

    2011-01-01

    Worldwide, falls among older people are a public health concern because of their frequency and adverse consequences in terms of morbidity, mortality, and quality of life, as well as their impact on health system services and costs. This epidemiological review outlines the public health burden of falls and fall-related injuries and the impact of…

  5. Falls, faints, fits and funny turns.

    NARCIS (Netherlands)

    Thijs, R.D.; Bloem, B.R.; Dijk, J.G. van

    2009-01-01

    In this practically oriented review, we will outline the clinical approach of patients with falls due to an impairment or loss of consciousness. Following a set of definitions, we describe the salient clinical features of disorders leading to such falls. Among falls caused by true loss of consciousn

  6. Epidemiology of Falls in Older Age

    Science.gov (United States)

    Peel, Nancye May

    2011-01-01

    Worldwide, falls among older people are a public health concern because of their frequency and adverse consequences in terms of morbidity, mortality, and quality of life, as well as their impact on health system services and costs. This epidemiological review outlines the public health burden of falls and fall-related injuries and the impact of…

  7. 29 CFR 1917.41 - House falls.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false House falls. 1917.41 Section 1917.41 Labor Regulations...) MARINE TERMINALS Cargo Handling Gear and Equipment § 1917.41 House falls. (a) Span beams shall be secured... working with house fall blocks. (c) Designated employees shall inspect chains, links, shackles,...

  8. The variability of meteoroid falling

    Science.gov (United States)

    Velasco Herrera, V. M.; Cordero, G.

    2016-10-01

    We analysed a historical catalogue of meteoroid falling during the last 400 years. We report here for the first time the synchronization between observed meteors and solar barycentric parameters in 19.6 and 13.2 years periodicities using a new multiple cross wavelet. The group of moderated number of meteors is distributed around the positive phase of the solar barycentric periodicity of 13.2 years. While the group of severe number of meteors are distributed on the positive phase of the solar barycentric periodicity of 19.6 years. These periodicities could be associated with Jupiter periodicities. So understanding the modulation of meteoroid falling is important for determining the falling patterns of these objects and for knowing when it is more likely to expect the entry of one of these objects into the Earth's atmosphere, because bodies falling onto the Earth can cause damage from minor impacts to mass-extinctions events. One of the most extreme events was the formation of the Chicxulub impact crater 65,000,000 years ago that caused one of the five major mass extinctions in the last 500,000,000 years. During the 20th and 21st centuries, a series of events demonstrated the importance of collisions between planets and small bodies (comets and asteroids), which included our own planet. In the case of the Earth, we can cite three examples: Tunguska, Curuça and Chelyabinsk. These events invite us to think that perhaps the occurrence of this phenomenon might be more common than we realize, but the lack of communication or people in the area where they happened prevents us from having a complete record. Modern man has not witnessed the impact of large asteroids or comets on our planet, but it has been observed on other planetary bodies. The most spectacular of these events was the collision of fragments of the comet Shoemaker-Levy 9 with Jupiter in 1994. The total energy of the 21 impacts on Jupiter's atmosphere was estimated as the equivalent of tens of millions of

  9. A fully relativistic radial fall

    CERN Document Server

    Spallicci, Alessandro D A M

    2014-01-01

    Radial fall has historically played a momentous role. It is one of the most classical problems, the solutions of which represent the level of understanding of gravitation in a given epoch. A {\\it gedankenexperiment} in a modern frame is given by a small body, like a compact star or a solar mass black hole, captured by a supermassive black hole. The mass of the small body itself and the emission of gravitational radiation cause the departure from the geodesic path due to the back-action, that is the self-force. For radial fall, as any other non-adiabatic motion, the instantaneous identity of the radiated energy and the loss of orbital energy cannot be imposed and provide the perturbed trajectory. In the first part of this letter, we present the effects due to the self-force computed on the geodesic trajectory in the background field. Compared to the latter trajectory, in the Regge-Wheeler, harmonic and all others smoothly related gauges, a far observer concludes that the self-force pushes inward (not outward) ...

  10. Studies On Falling Ball Viscometry

    CERN Document Server

    Singh, Amit Vikram; Gupta-Bhaya, Pinaki

    2012-01-01

    A new method of accurate calculation of the coefficient of viscosity of a test liquid from experimentally measured terminal velocity of a ball falling in the test liquid contained in a narrow tube is described. The calculation requires the value of a multiplicative correction factor to the apparent coefficient of viscosity calculated by substitution of terminal velocity of the falling ball in Stokes formula. This correction factor, the so-called viscosity ratio, a measure of deviation from Stokes limit, arises from non-vanishing values of the Reynolds number and the ball/tube radius ratio. The method, valid over a very wide range of Reynolds number, is based on the recognition of a relationship between two measures of wall effect, the more widely investigated velocity ratio, defined as the ratio of terminal velocity in a confined medium to that in a boundless medium and viscosity ratio. The calculation uses two recently published correlation formulae based on extensive experimental results on terminal velocit...

  11. Intrinsic Risk Factors of Falls in Elderly

    Directory of Open Access Journals (Sweden)

    Yasmin Amatullah

    2016-09-01

    Full Text Available Background: Falls are common geriatric problems. The risk factors of falls are the intrinsic and extrinsic risk factors. Studies on falls are scarcely conducted in Indonesia, especially in Bandung. Therefore, this study was conducted to identify the intrinsic risk factors of falls among elderly. Methods: A descriptive study was carried out from August to October 2013 at the Geriatric Clinic of Dr. Hasan Sadikin General Hospital Bandung. Fifty three participants were selected according to the inclusion and exclusion criteria using consecutive sampling. The determined variables in this study were classification of the risk of falls, demographic profile, history of falls, disease, and medications. After the selection, the participants were tested by Timed up-and-go test (TUGT. Moreover, an interview and analysis of medical records were carried out to discover the risk factors of falls. The collected data were analyzed and presented in the form of percentages shown in tables. Results: From 53 patients, women (35.66% were considered to have higher risk of fall than men (18.34%. The majority of patients (66% with the risk of fall were from the age group 60–74 years. The major diseases suffered by patients were hypertension, osteoarthritis and diabetes mellitus. Drugs that were widely used were antihypertensive drugs; analgesic and antipyretic drugs and antidiabetic drugs. Conclusions: There are various intrinsic risk factors of falls in elderly and each of the elderly has more than one intrinsic risk factor of falls.

  12. Two essays on electricity markets: Entry into hydroelectric generation industry and the political cycle of regulated prices

    Science.gov (United States)

    Moita, Rodrigo Menon Simoes

    This dissertation is about the electricity industry and the problems that arise with the liberalization and de-regulation of the industry. Characteristics intrinsic to the electricity market create problems that can compromise an efficient functioning of this market. Each of the two chapters of this dissertation focus on a specific aspect of this industry. The first chapter analyzes entry in the hydroelectric generation industry. The operation of a generator upstream regularizes the river flow for generators located downstream on the same river, increasing the production capacity of the latter. This positive externality increases the attractiveness of the locations downstream whenever a generator decides to enter upstream. Therefore, the entry decision of a generator in a given location may affect all entry decisions in potential locations for plants located downstream. I first model the problem of generators located in cascade on the same river and show the positive effect of the externality. Second, I use a panel of data on investment decisions of hydro-generation firms to estimate an entry model that takes into account the effect of the externality generated by entry upriver. The results show a positive incentive to locate downstream from existing plants and from locations where entry is likely to occur. Location characteristics also play an important role on the entrants' decisions. The model provides estimates of the average expected market price across the different years covered by the sample and shows that it rose one year before the energy crisis of 2001, evidencing that the market anticipated the crisis. This result has important implications on the evaluation of the Brazilian market design. It shows that entry responded to a rise in expectations about excess demand in the future, contradicting the argument that the crisis was a consequence of mis-designed market institutions. The second chapter deals with the problem of the political cycle in regulated

  13. Fish & Wildlife Annual Project Summary, 1983.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1984-07-01

    BPA's Division of Fish and Wildlife was created in 1982 to develop, coordinate and manage BPA's fish and wildlife program. Division activities protect, mitigate, and enhance fish and wildlife resources impacted by hydroelectric development and operation in the Columbia River Basin. At present the Division spends 95% of its budget on restoration projects. In 1983, 83 projects addressed all aspects of the anadromous fish life cycle, non-migratory fish problems and the status of wildlife living near reservoirs.

  14. Planning small hydroelectric power plants, considering private sector prospects; O planejamento de pequenas centrais hidreletricas face as perspectivas da iniciativa privada

    Energy Technology Data Exchange (ETDEWEB)

    Martinez, Carlos B. [Minas Gerais Univ., Belo Horizonte, MG (Brazil). Dept. de Engenheria Hidraulica e Recursos Hidricos; Bajay, Sergio V. [Universidade Estadual de Campinas, SP (Brazil)

    1996-12-31

    The participation of the private sector in the generation of electric power in Brazil and the experiences of private groups in the construction and operation of small hydroelectric power plants are analysed. 10 refs., 2 figs., 2 tabs

  15. Kilowatts and crisis among the Kuna, Choco, and Colonos: national and regional consequences of the Bayano hydroelectric complex in eastern Panama

    Energy Technology Data Exchange (ETDEWEB)

    Wali, A.

    1984-01-01

    The dissertation analyzes the sociopolitical consequences of a hydroelectric project (from 1972-1980) on the Bayano Region of Eastern Panama, in order to gauge the national implications of macrodevelopment programs, and determine the local-level impact. Specifically, the study demonstrates that the government's decision to construct the dam, motivated by historical and economic forces, had detrimental consequences for the affected people through changes in patterns of land tenure, economic productivity, and social stratification. Simultaneously, the goal of diversification of the canal-dominated economic structure has not been achieved. Forced resettlement deeply affected the regional population (Kuna and Choco - Amerindians, and Colonos - migrants from Western Panama). Agricultural productivity declined dramatically leading to an upsurge in other economic activities (wage labor, lumbering, and entrepreneurship). The Kuna, having lost 80% of their original reserve, strengthened their leadership institutions in order to negotiate a new reserve. The Choco were forced to settle in a village, contrary to tradition, leading to increased disputes. The Colonos experienced an increased polarization of wealth due to differential access to resources. The Kuna and Choco espoused an ethnic strategy to maintain territorial sovereignity leading to increased intergroup conflict.

  16. A model optimization for pre-dispatch among the hydroelectric generator unities; Um modelo de otimizacao para pre-despacho entre as unidades geradoras de hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Colnago, Glauber R.; Correia, Paulo B. [Universidade Estadual de Campinas (UNICAMP), Campinas, SP (Brazil). Faculdade de Engenharia Mecanica]. E-mails: grcolnago@fem.unicamp.br; pcorreia@fem.unicamp.br

    2006-07-01

    This work proposes a mixed integer nonlinear programming model to pre-dispatch of a hydroelectric power plant. In the model we want to minimize the losses in the electricity generation with conditions of electricity demand, operational prohibited zones and units' efficiency data. The Xingo Hydroelectric Power Plant was utilized in the mode tests. The solver used was Lingo 8.0. (author)

  17. The use of Amazon hydroelectric potential compared to other options; O uso do potencial hidroeletrico da Amazonia versus outras opcoes

    Energy Technology Data Exchange (ETDEWEB)

    Furtado, Ricardo C. [Companhia Hidreletrica do Sao Francisco (CHESF), Recife, PE (Brazil)

    1997-12-31

    This article discusses the use of the Amazon hydroelectric potential for the expansion of the generation system in Brazil. It examines the main options of electricity production and compares these electric power resources in terms of the electricity consumers`and experts`perceptions of the environmental impacts and costs. This analysis is based on a Ph D research carried out from 1993 to 1995 (Furtado, 1996). The findings of the study show that, from the environmental perspective, hydroelectric power is the most attractive option for the expansion of the generation system in Brazil, followed by the coal option and, in a distant third place, the nuclear option. (author) 15 refs., 4 tabs.; e-mail: furtado at elogica.com.br

  18. EVALUATION OF OPTIONS FOR ERECTING SMALL HYDROELECTRIC POWER PLANTS ON THE RIVER BYSTRZYCA PÓŁNOCNA

    Directory of Open Access Journals (Sweden)

    Andrzej Mazur

    2016-11-01

    Full Text Available This paper contains an analysis of conditions for erecting small hydroelectric power plants on the selected river in Lublin Region. The analysis covers technical options of the location of the facilities and their energy potential split into theoretical and technical potential. In addition, it refers to the most important legislative acts governing water management, including environmental protection. According to the analysis, the technical potential of small hydroelectric power plants on the river Bystrzyca Północna is about 125.5 kW. Energy production capacity is limited by both hydrological conditions and the necessity to adapt to regulatory framework concerning nature and environment protection, superior functions of watercourses and their situation in agricultural land.

  19. Effects of Hyporheic Exchange Flows on Egg Pocket Water Temperature in Snake River Fall Chinook Salmon Spawning Areas, 2002-2003 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hanrahan, T.; Geist, D.; Arntzen, C. (Pacific Northwest National Laboratory)

    2004-09-01

    The development of the Snake River hydroelectric system has affected fall Chinook salmon smolts by shifting their migration timing to a period (mid- to late-summer) when downstream reservoir conditions are unfavorable for survival. Subsequent to the Snake River Chinook salmon fall-run Evolutionary Significant Unit being listed as Threatened under the Endangered Species Act, recovery planning has included changes in hydrosystem operations (e.g., summer flow augmentation) to improve water temperature and flow conditions during the juvenile Chinook salmon summer migration period. In light of the limited water supplies from the Dworshak reservoir for summer flow augmentation, and the associated uncertainties regarding benefits to migrating fall Chinook salmon smolts, additional approaches for improved smolt survival need to be evaluated. This report describes research conducted by the Pacific Northwest National Laboratory (PNNL) that evaluated relationships among river discharge, hyporheic zone characteristics, and egg pocket water temperature in Snake River fall Chinook salmon spawning areas. This was a pilot-scale study to evaluate these relationships under existing operations of Hells Canyon Dam (i.e., without any prescribed manipulations of river discharge) during the 2002-2003 water year. The project was initiated in the context of examining the potential for improving juvenile Snake River fall Chinook salmon survival by modifying the discharge operations of Hells Canyon Dam. The potential for improved survival would be gained by increasing the rate at which early life history events proceed (i.e., incubation and emergence), thereby allowing smolts to migrate through downstream reservoirs during early- to mid-summer when river conditions are more favorable for survival. PNNL implemented this research project at index sites throughout 160 km of the Hells Canyon Reach (HCR) of the Snake River. The HCR extends from Hells Canyon Dam (river kilometer [rkm] 399

  20. Problems of hydroelectric development at existing dams: an analysis of institutional, economic, and environmental restraints in Pennsylvania, New Jersey, and Maryland

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, R.J.; Green, L.L.

    1979-04-01

    The methodology that has been developed to analyze the impact of possible government actions on the development of small-scale hydroelectric power in the United States is described. The application of the methodology to a specific region of the United States is also described. Within the Pennsylvania-New Jersey-Maryland (PJM) region, the methodology has been used to evaluate the significance of some of the existing institutional and economic constraints on hydroelectric development at existing dams. The basic process for the analysis and evaluation is estimation of the hydroelectric energy that can be developed for a given price of electricity. Considering the present constraints and a geographical region of interest, one should be able to quantify the potential hydroelectric energy supply versus price. Estimates of how the supply varies with possible changes in governmental policies, regulations, and actions should assist the government in making decisions concerning these governmental functions relative to hydroelectric development. The methodology for estimating the hydroelectric supply at existing dams is included.

  1. Construction of the sustainable society and expectations of hydroelectric power engineers; Jizoku kanona shakai no kochiku to suiryoku gijutsusha eno kitai

    Energy Technology Data Exchange (ETDEWEB)

    Kurokawa, J. [Yokohama National University, Yokohama (Japan). Faculty of Engineering

    1999-10-10

    In the global competition among enterprises, even if winning the economic war, there will be waiting the construction of the sustainable society. The resource circulating type society should be aimed at. The present rich society was brought by exchange for the waste of resource/energy, but on the other hand, it brought a lot of spiritual poverty. Conserving resource/energy and heightening the utilization efficiency, the nature-human balance should be regained. The hydroelectric energy is the highest in density and the lowest in CO2 emission rate of all the natural energies. It is a highly excellent energy. In Japan, large hydroelectric power resource had almost been developed, and there remains only small hydroelectric power resource. Nevertheless, 20 million KW, 45% of all the hydroelectric power in Japan, remain undeveloped. It is said that small hydroelectric power does not pay because of its high developmental expenses, but it merits developmental efforts to be made by the persons concerned, as compared with wind power, solar energy, etc. In future, it is necessary to change the idea to the one of effective and multi-purpose utilization of low quality distributed small hydroelectric power resource. (NEDO)

  2. RECOVERY OF AN OXISOL DEGRADED BY THE CONSTRUCTION OF A HYDROELECTRIC POWER PLANT

    Directory of Open Access Journals (Sweden)

    Joseane Carina Borges de Carvalho

    2015-12-01

    Full Text Available ABSTRACT The removal of thick layers of soil under native scrubland (Cerrado on the right bank of the Paraná River in Selvíria (State of Mato Grosso do Sul, Brazil for construction of the Ilha Solteira Hydroelectric Power Plant caused environmental damage, affecting the revegetation process of the stripped soil. Over the years, various kinds of land use and management systems have been tried, and the aim of this study was to assess the effects of these attempts to restore the structural quality of the soil. The experiment was conducted considering five treatments and thirty replications. The following treatments were applied: stripped soil without anthropic intervention and total absence of plant cover; stripped soil treated with sewage sludge and planted to eucalyptus and grass a year ago; stripped soil developing natural secondary vegetation (capoeira since 1969; pastureland since 1978, replacing the native vegetation; and soil under native vegetation (Cerrado. In the 0.00-0.20 m layer, the soil was chemically characterized for each experimental treatment. A 30-point sampling grid was used to assess soil porosity and bulk density, and to assess aggregate stability in terms of mean weight diameter (MWD and geometric mean diameter (GMD. Aggregate stability was also determined using simulated rainfall. The results show that using sewage sludge incorporated with a rotary hoe improved the chemical fertility of the soil and produced more uniform soil pore size distribution. Leaving the land to develop secondary vegetation or turning it over to pastureland produced an intermediate level of structural soil quality, and these two treatments produced similar results. Stripped soil without anthropic intervention was of the lowest quality, with the lowest values for cation exchange capacity (CEC and macroporosity, as well as the highest values of soil bulk density and percentage of aggregates with diameter size <0.50 mm, corroborated by its lower

  3. A performance overview about fire risk management in the Brazilian hydroelectric generating plants and transmission network

    Energy Technology Data Exchange (ETDEWEB)

    Duarte, Dayse [Universidade Federal de Pernambuco, Dept. de Engenharia de Producao, Recife, PE (Brazil)

    2004-01-01

    : scenario identification and consequence analysis. It was based on fire dynamics principles, structure engineering and data. The relevant data includes CIGRE failure data, fire accident reports and CHESF maintenance experience on equipment. The analysis focus is on the difficulties that the hydroelectric plants and the transmission sector in Brazil have in tackling fire protection. They make no allusion to the need to take the fire risks that could lead to some type of impact in the interconnected network into consideration. It is hoped that the performance analysis in this study will shed some light on our ability to anticipate unwanted interactions along a hydroelectric plant or substation life circle. (Author)

  4. A UK guide to intake fish-screening regulations, policy and best practice with particular reference to hydroelectric power schemes

    Energy Technology Data Exchange (ETDEWEB)

    Turnpenny, A.W.H.; Struthers, G.; Hanson, P.

    1998-07-01

    A review of fish screening regulations in England, Wales, Scotland, and Northern Ireland is presented, and a summary of findings on screening legislation is given. The views of hydroelectric scheme developers, owners and operators are considered, and recommendations including the development of a risk assessment procedure are discussed. Fish screening technology, bypasses and other escape routes, and common fault in screen design and operation are examined, and guidance to Best Practice is given. (UK)

  5. Operator training for the Yacyreta binational hydroelectric power plant; Formacion de operadores para la Central Hidroelectrica de Yacireta

    Energy Technology Data Exchange (ETDEWEB)

    Dure, Francisco; Tachella, Heriberto [Entidad Binacional Yacyreta, Isla Yacireta (Paraguay). Central Hidroelectrica Yacyreta]. E-mail: yacyreta@internet.siscotel.com

    1998-07-01

    This work is oriented to the power plant operators, by exposing the criteria and methods adopted for operators selection, training and incorporation to the Yacyreta Hydroelectric Power Plant. The used criteria considered some aspects, as follows: the operation staff should be consisted of equal numbers of Argentine and Paraguayan nationalities, viewing the both systems operation; experience of the shift supervisors in operating a plant for a minimum of 10 years; the supervisors should participate training the auxiliary operators.

  6. Executive summary: legal obstacles and incentives to small-scale hydroelectric development in the six middle atlantic states

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The executive summary describes the relationship of Federal law and regulation to state law and regulation of small-scale hydroelectric facilities, highlighting important features of the constitutional, statutory, case law, and regulations of each of the six middle atlantic states (Maryland, Delaware, New York, New Jersey, Pennsylvania, and Virginia). Water law, direct and indirect regulation, and financial considerations for each state are presented. A flow diagram of regulation of small dams in each state is also included.

  7. City of Klamath Falls, Oregon Geothermal Power Plant Feasibility Study

    Energy Technology Data Exchange (ETDEWEB)

    Brian Brown, PE; Stephen Anderson, PE, Bety Riley

    2011-07-31

    The purpose of the Klamath Falls project is to demonstrate the effectiveness of a combined thermal distribution system and power generation facility. The city of Klamath Falls operates a geothermal district heating system which would appear to be an attractive opportunity to install a power generation system. Since the two wells have operated reliably and consistently over many years, no new sources or resource exploration would be necessary. It appears that it will cost more to construct, operate, maintain and amortize a proposed geothermal facility than the long?term value of the power it would produce. The success of a future project will be determined by whether utility power production costs will remain low and whether costs of construction, operations, or financing may be reduced. There are areas that it would be possible to reduce construction cost. More detailed design could enable the city to obtain more precise quotes for components and construction, resulting in reduction in contingency projections. The current level of the contingency for uncertainty of costs is between $200,000 and $300,000. Another key issue with this project appears to be operation cost. While it is expected that only minimal routine monitoring and operating expenses will occur, the cost of water supply and waste water disposal represents nearly one quarter of the value of the power. If the cost of water alone could be reduced, the project could become viable. In addition, the projected cost of insurance may be lower than estimated under a city?wide policy. No provisions have been made for utilization of federal tax incentives. If a transaction with a third-party owner/taxpayer were to be negotiated, perhaps the net cost of ownership could be reduced. It is recommended that these options be investigated to determine if the costs and benefits could be brought together. The project has good potential, but like many alternative energy projects today, they only work economically if the

  8. Falls and Fear of Falling After Stroke: A Case-Control Study.

    Science.gov (United States)

    Goh, Hui-Ting; Nadarajah, Mohanasuntharaam; Hamzah, Norhamizan Binti; Varadan, Parimalaganthi; Tan, Maw Pin

    2016-12-01

    Falls are common after stroke, with potentially serious consequences. Few investigations have included age-matched control participants to directly compare fall characteristics between older adults with and without stroke. Further, fear of falling, a significant psychological consequence of falls, has only been examined to a limited degree as a risk factor for future falls in a stroke population. To compare the fall history between older adults with and without a previous stroke and to identify the determinants of falls and fear of falling in older stroke survivors. Case-control observational study. Primary teaching hospital. Seventy-five patients with stroke (mean age ± standard deviation, 66 ± 7 years) and 50 age-matched control participants with no previous stroke were tested. Fall history, fear of falling, and physical, cognitive, and psychological function were assessed. A χ(2) test was performed to compare characteristics between groups, and logistic regression was performed to determine the risk factors for falls and fear of falling. Fall events in the past 12 months, Fall Efficacy Scale-International, Berg Balance Scale, Functional Ambulation Category, Fatigue Severity Scale, Montreal Cognitive Assessment, and Patient Healthy Questionnaire-9 were measured for all participants. Fugl-Meyer Motor Assessment was used to quantify severity of stroke motor impairments. Twenty-three patients and 13 control participants reported at least one fall in the past 12 months (P = .58). Nine participants with stroke had recurrent falls (≥2 falls) compared with none of the control participants (P control participants (P < .01). Female gender was associated with falls in the nonstroke group, whereas falls in the stroke group were not significantly associated with any measured outcomes. Fear of falling in the stroke group was associated with functional ambulation level and balance. Functional ambulation level alone explained 22% of variance in fear of falling in the

  9. Prediction of falls and/or near falls in people with mild Parkinson's disease.

    Directory of Open Access Journals (Sweden)

    Beata Lindholm

    Full Text Available To determine factors associated with future falls and/or near falls in people with mild PD.The study included 141 participants with PD. Mean (SD age and PD-duration were 68 (9.7 and 4 years (3.9, respectively. Their median (q1-q3 UPDRS III score was 13 (8-18. Those >80 years of age, requiring support in standing or unable to understand instructions were excluded. Self-administered questionnaires targeted freezing of gait, turning hesitations, walking difficulties in daily life, fatigue, fear of falling, independence in activities of daily living, dyskinesia, demographics, falls/near falls history, balance problems while dual tasking and pain. Clinical assessments addressed functional balance performance, retropulsion, comfortable gait speed, motor symptoms and cognition. All falls and near falls were subsequently registered in a diary during a six-month period. Risk factors for prospective falls and/or near falls were determined using logistic regression.Sixty-three participants (45% experienced ≥ 1 fall and/or near fall. Three factors were independent predictors of falls and/or near falls: fear of falling (OR = 1.032, p<0.001 history of near falls (OR = 3.475, p = 0.009 and retropulsion (OR = 2.813, p = 0.035. The strongest contributing factor was fear of falling, followed by a history of near falls and retropulsion.Fear of falling seems to be an important issue to address already in mild PD as well as asking about prior near falls.

  10. An Exemplary Career Education Program in the Great Falls Public Schools (K-14). Final Report.

    Science.gov (United States)

    Jackson, Frances

    Description, data, and conclusions are presented for a 3-year career education project in the Great Falls Public Schools (Montana) which focused on the systematic development of components which would be transportable and operationally effective. Major developmental emphases of the project are noted and include staff training, curriculum revision…

  11. How Will Hydroelectric Power Generation Develop under Climate Change Scenarios? A Case Study in the Upper Danube Basin

    Directory of Open Access Journals (Sweden)

    Markus Weber

    2011-09-01

    Full Text Available Climate change has a large impact on water resources and thus on hydropower. Hydroelectric power generation is closely linked to the regional hydrological situation of a watershed and reacts sensitively to changes in water quantity and seasonality. The development of hydroelectric power generation in the Upper Danube basin was modelled for two future decades, namely 2021–2030 and 2051–2060, using a special hydropower module coupled with the physically-based hydrological model PROMET. To cover a possible range of uncertainties, 16 climate scenarios were taken as meteorological drivers which were defined from different ensemble outputs of a stochastic climate generator, based on the IPCC-SRES-A1B emission scenario and four regional climate trends. Depending on the trends, the results show a slight to severe decline in hydroelectric power generation. Whilst the mean summer values indicate a decrease, the mean winter values display an increase. To show past and future regional differences within the Upper Danube basin, three hydropower plants at individual locations were selected. Inter-annual differences originate predominately from unequal contributions of the runoff compartments rain, snow- and ice-melt.

  12. The Effect of Hydroelectric Power Plants (hpp) on Agro-Life at Rural Land Regulation in Turkey

    Science.gov (United States)

    Onursal Denli, G.; Denli, H. H.; Seker, D. Z.; Bitik, E.; Cetin, S.

    2014-12-01

    Turkey is one of the self-sufficient in foodstuffs and globally ranks as 7th significant agricultural exporter in the world. Main trading partners are the European Union, the United States and the Middle East. As known, agricultural production is dependent on factors including efficient and effective use of all inputs ranging from those natural resources as in land and water to well-trained human resources as labour at the production. The socio-economic aspects of this sector take several forms ranging from the incomes of the primary producers. Rural land regulation is a necessity for rural areas and is regarded as a useful instrument for improving farmer's incomes and life standards. The irrigation system, established during the rural regulation/land consolidation period of large-scale farming, is insufficiently adjusted to the new land tenure structures. The government is especially in the process of water management with hydroelectric power plants. This process produces energy that is required but effects negatively the rivers and agricultural, environmental, climatic conditions. Rivers are vessels of the nature. Free flowing rivers give life to all nature. Most of the studies indicate that Hydroelectric Power Plants (HPP) affects the surface and ground-water management, natural life, agricultural productivity, socio-economic situation at agricultural regions and agro-life related with immigration. This study emphasizes the effect of Hydroelectric Power Plants which are used in transformation of water as a renewable natural resource into electricity power from the perspective of environmental policies and rural regulation.

  13. An outpatient multifactorial falls prevention intervention does not reduce falls in high-risk elderly Danes

    DEFF Research Database (Denmark)

    Vind, Ane B; Andersen, Hanne E; Pedersen, Kirsten D

    2009-01-01

    OBJECTIVES: To evaluate the effect of multifactorial fall prevention in community-dwelling people aged 65 and older in Denmark. DESIGN: Randomized, controlled clinical trial. SETTING: Geriatric outpatient clinic at Glostrup University Hospital. PARTICIPANTS: Three hundred ninety-two elderly people......, mean age 74, 73.7%women, who had visited the emergency department or had been hospitalized due to a fall. INTERVENTION: Identification of general medical, cardiovascular, and physical risk factors for falls and individual intervention in the intervention group. Participants in the control group...... received usual care. MEASUREMENTS: Falls were registered prospectively in falls diaries, with monthly telephone calls for collection of data. Outcomes were fall rates and proportion of participants with falls, frequent falls, and injurious falls in 12 months. RESULTS: Groups were comparable at baseline...

  14. CFD evaluation of added damping due to fluid flow over a hydroelectric turbine blade

    Science.gov (United States)

    Gauthier, J. P.; Giroux, A. M.; Etienne, S.; Gosselin, F. P.

    2016-11-01

    To estimate structural fatigue, vibrational response to realistic spectrum of excitations and associated equivalent damping are of paramount importance. In this paper, an approach to quantify flow-induced damping of a relatively heavy fluid on a vibrating hydraulic turbine blade using numerical simulations is presented. First, mode shapes and frequencies of the immersed structure are obtained by modal analysis using the finite element method. Then, forced oscillatory modal motion is prescribed on the structural boundary of unsteady Reynolds-averaged Navier-Stokes flow simulations. Damping is finally computed as the normalized work done by the resulting fluid load on the structure. Validation is achieved by comparing the numerical results with available experimental data for a steel hydrofoil oscillating in flowing water. For this case, the linear increase in the damping ratio with the flow velocity is reproduced within 10% of the experimental values. Application of the method to an actual hydroelectric propeller turbine blade yields a fluid damping value of around 15% of critical damping for its first vibration mode.

  15. Impacts of hydroelectric dams on alluvial riparian plant communities in eastern Brazilian Amazonian

    Directory of Open Access Journals (Sweden)

    LEANDRO VALLE FERREIRA

    2013-09-01

    Full Text Available The major rivers of the Amazon River basin and their biota are threatened by the planned construction of large hydroelectric dams that are expected to have strong impacts on floodplain plant communities. The present study presents forest inventories from three floodplain sites colonized by alluvial riparian vegetation in the Tapajós, Xingu and Tocantins River basins in eastern Amazonian. Results indicate that tree species of the highly specialized alluvial riparian vegetation are clearly distinct among the three river basins, although they are not very distinct from each other and environmental constraints are very similar. With only 6 of 74 species occurring in all three inventories, most tree and shrub species are restricted to only one of the rivers, indicating a high degree of local distribution. Different species occupy similar environmental niches, making these fragile riparian formations highly valuable. Conservation plans must consider species complementarily when decisions are made on where to place floodplain forest conservation units to avoid the irreversible loss of unique alluvial riparian vegetation biodiversity.

  16. Determination of methane emissions in three hydroelectric dams in Costa Rica

    Directory of Open Access Journals (Sweden)

    Jorge Herrera

    2013-12-01

    Full Text Available The emission fluxes of methane (CH4 across air–water interface were measured in three hydroelectric dams in Costa Rica (Brasil, Nuestro Amo and Cote Lake during three years cycle (2009-2011, using the floating static chamber technique. Samples were taken during one week, both day and night time, through four campaigns per year. For the methane flux determination the water surface was divided in a 4x4 grid equally spaced. During this period, CH4 fluxes showed average values that ranged from 759 – 4282 (Brasil, 77 – 733 (Nuestro Amo and 10,9 – 44,2 mg CH4 m-2 d-1 (Cote Lake, respectively. The fluxes of CH4 showed both strong seasonal and diurnal variations. CH4 emission rate was highest in dry season and there was a significant difference for CH4 emissions between day and night, the ratios between nighttime to daytime methane flux increased from 0,35 to 0,72, 0,43 to 0,64 for Brasil and Nuestro Amo, respectively in this season. CH4 emission was correlated positively with soil temperature, water table and chlorophyll a water concentrations.

  17. Hydroelectric microcentrals for small consumption centers; Microcentrales hidroelectricas para pequenos centros de consumo

    Energy Technology Data Exchange (ETDEWEB)

    Angeles A, V. H.; Espino C, F. P. [Universidad Autonoma Metropolitana, Mexico, D. F. (Mexico); Buitron Sanchez, H. C. [Programa de Ahorro de Energia para el Sector Electrico, Mexico, D. F. (Mexico)

    1995-12-31

    The utilization of alternate energy sources (wind power, solar and hydro to small scale) represents an option for the rural electrification. This paper analyzes the case of hydro microgeneration, for this purpose the mechanical and electrical fitting are mainly discussed. For the mechanical re-equipment the turbine types that can be used are fundamentally presented and how they can be selected. As to the electrical re-equipment the different types of electric generators are discussed, as well as the form of selecting them, the operation, the control and the protection in the hydroelectric microcentrals. [Espanol] La utilizacion de fuentes alternas de energia (eolica, solar e hidraulica a pequena escala) representan una alternativa para la electrificacion rural. Este trabajo trata del caso de la microgeneracion hidraulica para la cual se discuten principalmente, alternativas para el equipamiento mecanico y electrico. Para el equipamiento mecanico se presentan fundamentalmente los tipos de turbinas que pueden ser utilizadas y como se pueden seleccionar. En cuanto al equipo electrico se manejan los diferentes tipos de generadores, la forma de seleccionarlos, la operacion, el control y la proteccion en las microcentrales hidroelectricas.

  18. Overview of, and demands on, small hydroelectric turbines; Kleinwasserturbinen, Ueberblick und Anforderungen

    Energy Technology Data Exchange (ETDEWEB)

    Lein, G. [Stuttgart Univ. (Germany). Inst. fuer Stroemungsmechanik und Hydraulische Stroemungsmaschinen

    1997-12-31

    The report deals with some aspects of small hydroelectric turbines which the reporter`s experience has proved to be relevant. Although this experience derives in part from larger units, most of it holds true also of small turbines. The report does not restrict itself to the high-tech conditions of central Europe. A brief overview of turbine types is given. Questions of the choice and construction of turbines, and questions relating to guarantees and their verification are discussed. Some important standards, norms and guidelines which apply to small turbines are pointed out. (orig.) [Deutsch] Im folgenden Bericht werden einige Aspekte von Kleinwasserturbinen angesprochen, die nach der Erfahrung des Berichters von Wichtigkeit sind. Wenn diese Erfahrungen auch zum Teil an groesseren Einheiten gewonnen wurden, so sind sie doch ueberwiegend auch fuer Kleinturbinen gueltig. Der Bericht beschraenkt sich dabei nicht auf Verhaeltnisse in unserem hochtechnisierten mitteleuropaeischen Raum. Nach einem kurzen Ueberblick ueber die Turbinentypen werden Fragen der Turbinenauswahl und -konstruktion und der Garantien und deren Nachweis angesprochen. Schliesslich wird eine Uebersicht ueber einige wichtige Standards, Normen und Richtlinien, die auf Kleinturbinen angewendet werden koennen, gegeben. (orig.)

  19. Distribution of Major and Trace Elements in a Tropical Hydroelectric Reservoir in Sarawak, Malaysia

    Science.gov (United States)

    Nyanti, Lee; Ean Lee, Terri Zhuan; Mohd Irwan Lu, Nurul Aida Lu

    2014-01-01

    This paper reports the metals content in water, sediment, macroalgae, aquatic plant, and fish of Batang Ai Hydroelectric Reservoir in Sarawak, Malaysia. The samples were acid digested and subjected to atomic absorption spectrometry analysis for Na, K, Mn, Cr, Ni, Zn, Mg, Fe, Sn, Al, Ca, As, Se, and Hg. The total Hg content was analysed on the mercury analyser. Results showed that metals in water, sediment, macroalgae, aquatic plant, and fish are distinguishable, with sediment and biota samples more susceptible to metal accumulation. The distributions of heavy metals in water specifically Se, Sn, and As could have associated with the input of fish feed, boating, and construction activities. The accumulation of heavy metals in sediment, macroalgae, and aquatic plant on the other hand might be largely influenced by the redox conditions in the aquatic environment. According to the contamination factor and the geoaccumulation index, sediment in Batang Ai Reservoir possesses low risk of contamination. The average metal contents in sediment and river water are consistently lower than the literature values reported and well below the limit of various guidelines. For fishes, trace element Hg was detected; however, the concentration was below the permissible level suggested by the Food and Agriculture Organization. PMID:27437493

  20. Supporting measures for hydroelectric power: Legal price regulation; Die preisrechtliche Foerderung der Energiegewinnung aus Wasserkraft

    Energy Technology Data Exchange (ETDEWEB)

    Knoedler, H. [Hochschule fuer Verwaltungswissenschaften, Speyer (Germany). Lehrstuhl fuer Wirtschaftliche Staatswissenschaften, insbesondere Allgemeine Volkswirtschaftslehre, Wirtschaftspolitik; Theobald, C. [Hochschule fuer Verwaltungswissenschaften, Speyer (Germany). Lehrstuhl fuer Verwaltungswissenschaft, Regierungslehre und Oeffentliches Recht

    1996-12-31

    In Germany, the utilization of water-power has a long tradition. Its share of the public electricity supply amounts to almost 4% with an upward trend, making hydroelectric power the leader among the renewable sources of energy. The fact that the growing contribution of water-power is an important element of future-oriented energy policy has only recently been confirmed by the German Federal Government. The following examines whether it is justified to claim that the electricity feed-in law (Stromeinspeisungsgesetz) from 1991 - a corner-stone in promoting renewable sources of energy - is unconstitutional. The paper also illustrates differences between economists and lawyers in characterizing taxes. (orig.) [Deutsch] Die Nutzung der Wasserkraft hat in Deutschland eine lange Tradition. Ihr Anteil an der Bereitstellung des Stroms fuer die oeffentliche Versorgung betraegt knapp 4% bei steigender Tendenz, womit sie Marktfuehrer unter den regenerativen Energietraegern ist. Dass deren verstaerkte Nutzung wichtiger Bestandteil einer zukunftsweisenden Energiepolitik ist, hat die Bundesregierung erst kuerzlich wieder bekraeftigt. Ob das Stromeinspeisungsgesetz (StrEG) - als ein Eckpfeiler zur Foerderung regenerativer Energietraeger - gegenwaertig zurecht dem Vorwurf der Verfassungswidrigkeit ausgesetzt ist, hinterfragt der folgende Beitrag. (orig.)