WorldWideScience

Sample records for factory acceptance test

  1. Factory Acceptance Test Procedure Westinghouse 100 ton Hydraulic Trailer

    International Nuclear Information System (INIS)

    Aftanas, B.L.

    1994-01-01

    This Factory Acceptance Test Procedure (FAT) is for the Westinghouse 100 Ton Hydraulic Trailer. The trailer will be used for the removal of the 101-SY pump. This procedure includes: safety check and safety procedures; pre-operation check out; startup; leveling trailer; functional/proofload test; proofload testing; and rolling load test

  2. Pump testing - Comparison of factory vs. field test of centrifugal pumps

    International Nuclear Information System (INIS)

    Fehlau, R.

    1992-01-01

    Testing of pumps in situ, i.e., as installed in a system, will typically yield somewhat different performance results from the original manufacturer's factory test. This paper discusses some of the reasons for these variations. It shows that the factory test curves can be used for evaluation of initial acceptance tests but not for reference in normal inservice testing (IST). This is the basis for reference values used in American Society of Mechanical Engineers (ASME) Section 11 specifications and the revised ASME Code 1990

  3. Preparation of acceptance tests and criteria for the Test Blanket Systems to be operated in ITER

    Energy Technology Data Exchange (ETDEWEB)

    Laan, J.G. van der, E-mail: JaapG.vanderLaan@iter.org [ITER Organization, Route de Vinon sur Verdon, CS 90 046, 13067 St Paul Lez Durance Cedex (France); Cuquel, B. [AIRBUS Defence and Space S.A.S., 13115 Saint Paul Lez Durance (France); Demange, D.; Ghidersa, B.-E. [Karlsruhe Institute of Technology, Karlsruhe (Germany); Giancarli, L.M.; Iseli, M.; Jourdan, T. [ITER Organization, Route de Vinon sur Verdon, CS 90 046, 13067 St Paul Lez Durance Cedex (France); Nevière, J.-C. [Comex-Nucleaire, 13115 Saint Paul Lez Durance (France); Pascal, R.; Ring, W. [ITER Organization, Route de Vinon sur Verdon, CS 90 046, 13067 St Paul Lez Durance Cedex (France)

    2015-10-15

    Highlights: • Initial guideline for acceptance testing and acceptance criteria for Test Blanket Systems in ITER. • These tests complement those required by the applicable codes and standards, and regulations. • Completion of TBS manufacture will be followed by Factory Acceptance Testing, prior to shipment. • Next steps are “Reception Inspection Tests”, and on-site pre-installation and components tests. • This guideline allows the detailing of the TBS specific test plans and their scheduling. - Abstract: This paper describes the main acceptance criteria and required acceptance tests for the components of the six Test Blanket Systems to be installed and operated in ITER. It summarizes the guide-line toward the establishment of detailed test plans for the TBS, starting from the end-product at the ITER Members factories, and to generally define the type of tests that have to be performed on the ITER site after shipment, and/or prior to the systems final commissioning phase.

  4. Review of the Factory Acceptance Tests and Cold Tests of the W7-X Superconducting Magnets

    International Nuclear Information System (INIS)

    Ehmler, H.; Baldzuhn, J.; Genini, L.

    2006-01-01

    The W7-X magnet system consists of 50 non-planar coils of five different types and 20 planar coils of two different types. Factory acceptance tests of the non-planar coils are carried out at the manufacturer site of Babcock-Noell, Germany, and for the planar coils at Tesla Engineering, UK. They consist of electrical insulation checks, mass flow measurements and leak tests. In the test facility of CEA Saclay, France, each coil is cooled down to ∼ 6 K and operated at nominal current. At least one coil of each type is quenched by increasing the inlet temperature. The characteristic parameters of the quench tests (temperature, pressure, speed of normal-conducting zone, etc.) will be presented. Coils of the same type show a uniform behavior. The occurrences of leaks during cool-down on planar coils revealed quality problems with aluminum welds and stress corrosion of stainless steel tubes at the soldered connections with copper heat sinks. AC tests (impulse and impedance tests) were applied to detect short circuits during the fabrication of the winding packs. High voltage DC tests under vacuum and low gas pressure (Paschen-minimum conditions) revealed electrical insulation defects, which had not been found using standard high-voltage tests. These were mainly due to voids and cavities present in the winding pack after vacuum impregnation, insufficient glass-epoxy wrapped insulation and inappropriate design of the Kapton insulated quench detection cables. The mass flow measurements of the superconductor showed that the deviation between individual double layers of the coils is within acceptable limits. Two winding packs were given up by the supplier because of a superconductor blockage with resin and a short circuited winding, respectively. All other quality issues could be resolved by repair or changes in the components. The coil instrumentation with temperature sensors seems to be adequate. The strain gauges need improvements in temperature compensation and gluing

  5. DKIST enclosure modeling and verification during factory assembly and testing

    Science.gov (United States)

    Larrakoetxea, Ibon; McBride, William; Marshall, Heather K.; Murga, Gaizka

    2014-08-01

    The Daniel K. Inouye Solar Telescope (DKIST, formerly the Advanced Technology Solar Telescope, ATST) is unique as, apart from protecting the telescope and its instrumentation from the weather, it holds the entrance aperture stop and is required to position it with millimeter-level accuracy. The compliance of the Enclosure design with the requirements, as of Final Design Review in January 2012, was supported by mathematical models and other analyses which included structural and mechanical analyses (FEA), control models, ventilation analysis (CFD), thermal models, reliability analysis, etc. During the Enclosure Factory Assembly and Testing the compliance with the requirements has been verified using the real hardware and the models created during the design phase have been revisited. The tests performed during shutter mechanism subsystem (crawler test stand) functional and endurance testing (completed summer 2013) and two comprehensive system-level factory acceptance testing campaigns (FAT#1 in December 2013 and FAT#2 in March 2014) included functional and performance tests on all mechanisms, off-normal mode tests, mechanism wobble tests, creation of the Enclosure pointing map, control system tests, and vibration tests. The comparison of the assumptions used during the design phase with the properties measured during the test campaign provides an interesting reference for future projects.

  6. Understanding Student Teachers' Behavioural Intention to Use Technology: Technology Acceptance Model (TAM) Validation and Testing

    Science.gov (United States)

    Wong, Kung-Teck; Osman, Rosma bt; Goh, Pauline Swee Choo; Rahmat, Mohd Khairezan

    2013-01-01

    This study sets out to validate and test the Technology Acceptance Model (TAM) in the context of Malaysian student teachers' integration of their technology in teaching and learning. To establish factorial validity, data collected from 302 respondents were tested against the TAM using confirmatory factor analysis (CFA), and structural equation…

  7. Design, manufacture and factory testing of the Ion Source and Extraction Power Supplies for the SPIDER experiment

    International Nuclear Information System (INIS)

    Bigi, Marco; Rinaldi, Luigi; Simon, Muriel; Sita, Luca; Taddia, Giuseppe; Carrozza, Saverino; Decamps, Hans; Luchetta, Adriano; Meddour, Abdelraouf; Moressa, Modesto; Morri, Cristiano; Musile Tanzi, Antonio; Recchia, Mauro; Wagner, Uwe; Zamengo, Andrea; Toigo, Vanni

    2015-01-01

    Highlights: • 5 MVA ion source power supplies effectively integrated in 150 m"2 Faraday cage. • Load protection and performance requirements met of custom design high voltage power supplies. • 200 kW tetrode oscillator with 200 kHz frequency range successfully tested. - Abstract: The SPIDER experiment, currently under construction at the Neutral Beam Test Facility in Padua, Italy, is a full-size prototype of the ion source for the ITER Neutral Beam Injectors. The Ion Source and Extraction Power Supplies (ISEPS) for SPIDER are supplied by OCEM Energy Technology s.r.l. (OCEM) under a procurement contract with Fusion for Energy (F4E) covering also the units required for MITICA and ITER injectors. The detailed design of SPIDER ISEPS was finalized in 2011 and manufacture of most components completed by end 2013. The Factory Acceptance Tests took place early 2014. ISEPS, with an overall power rating of 5 MVA, form a heterogeneous set of items including solid state power converters and 1 MHz radiofrequency generators of 200 kW output power. The paper presents the main features of the detailed design developed by OCEM, focusing in particular on the high output voltage pulse step modulators, the high output current resonant converters, the radiofrequency generators by HIMMELWERK GmbH and the architecture and implementation of the complex control system. Details are given on non-standard factory tests verifying the insulation requirements specific to this application. Performance of ISEPS during the factory acceptance tests is described, with emphasis on demonstration of the load protection requirements, a crucial point for all neutral beam power supplies. Finally, key dates of SPIDER ISEPS installation and site testing schedule are provided.

  8. Design, manufacture and factory testing of the Ion Source and Extraction Power Supplies for the SPIDER experiment

    Energy Technology Data Exchange (ETDEWEB)

    Bigi, Marco, E-mail: marco.bigi@igi.cnr.it [Consorzio RFX (CNR, ENEA, INFN, Università di Padova, Acciaierie Venete SpA), Corso Stati Uniti 4, 35127 Padova (Italy); Rinaldi, Luigi [OCEM Energy Technology, Via della Solidarietà 2/1, 40056 Valsamoggia (località Crespellano), Bologna (Italy); Simon, Muriel [Fusion for Energy, Josep Pla 2, 08019 Barcelona (Spain); Sita, Luca; Taddia, Giuseppe; Carrozza, Saverino [OCEM Energy Technology, Via della Solidarietà 2/1, 40056 Valsamoggia (località Crespellano), Bologna (Italy); Decamps, Hans [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul lez Durance (France); Luchetta, Adriano [Consorzio RFX (CNR, ENEA, INFN, Università di Padova, Acciaierie Venete SpA), Corso Stati Uniti 4, 35127 Padova (Italy); Meddour, Abdelraouf [HIMMELWERK Hoch- und Mittelfrequenzanlagen GmbH, Jopestr. 10, 72072 Tübingen (Germany); Moressa, Modesto [Consorzio RFX (CNR, ENEA, INFN, Università di Padova, Acciaierie Venete SpA), Corso Stati Uniti 4, 35127 Padova (Italy); Morri, Cristiano; Musile Tanzi, Antonio [OCEM Energy Technology, Via della Solidarietà 2/1, 40056 Valsamoggia (località Crespellano), Bologna (Italy); Recchia, Mauro [Consorzio RFX (CNR, ENEA, INFN, Università di Padova, Acciaierie Venete SpA), Corso Stati Uniti 4, 35127 Padova (Italy); Wagner, Uwe [HIMMELWERK Hoch- und Mittelfrequenzanlagen GmbH, Jopestr. 10, 72072 Tübingen (Germany); Zamengo, Andrea; Toigo, Vanni [Consorzio RFX (CNR, ENEA, INFN, Università di Padova, Acciaierie Venete SpA), Corso Stati Uniti 4, 35127 Padova (Italy)

    2015-10-15

    Highlights: • 5 MVA ion source power supplies effectively integrated in 150 m{sup 2} Faraday cage. • Load protection and performance requirements met of custom design high voltage power supplies. • 200 kW tetrode oscillator with 200 kHz frequency range successfully tested. - Abstract: The SPIDER experiment, currently under construction at the Neutral Beam Test Facility in Padua, Italy, is a full-size prototype of the ion source for the ITER Neutral Beam Injectors. The Ion Source and Extraction Power Supplies (ISEPS) for SPIDER are supplied by OCEM Energy Technology s.r.l. (OCEM) under a procurement contract with Fusion for Energy (F4E) covering also the units required for MITICA and ITER injectors. The detailed design of SPIDER ISEPS was finalized in 2011 and manufacture of most components completed by end 2013. The Factory Acceptance Tests took place early 2014. ISEPS, with an overall power rating of 5 MVA, form a heterogeneous set of items including solid state power converters and 1 MHz radiofrequency generators of 200 kW output power. The paper presents the main features of the detailed design developed by OCEM, focusing in particular on the high output voltage pulse step modulators, the high output current resonant converters, the radiofrequency generators by HIMMELWERK GmbH and the architecture and implementation of the complex control system. Details are given on non-standard factory tests verifying the insulation requirements specific to this application. Performance of ISEPS during the factory acceptance tests is described, with emphasis on demonstration of the load protection requirements, a crucial point for all neutral beam power supplies. Finally, key dates of SPIDER ISEPS installation and site testing schedule are provided.

  9. Specification and acceptance testing of radiotherapy treatment planning systems

    International Nuclear Information System (INIS)

    2007-04-01

    Quality assurance (QA) in the radiation therapy treatment planning process is essential to ensure accurate dose delivery to the patient and to minimize the possibility of accidental exposure. The computerized radiotherapy treatment planning systems (RTPSs) are now widely available in industrialized and developing countries and it is of special importance to support hospitals in Member States in developing procedures for acceptance testing, commissioning and QA of their RTPSs. Responding to these needs, a group of experts developed an IAEA publication with such recommendations, which was published in 2004 as IAEA Technical Reports Series No. 430. This report provides a general framework and describes a large number of tests and procedures that should be considered by the users of new RTPSs. However, small hospitals with limited resources or large hospitals with high patient load and limited staff are not always able to perform complete characterization, validation and software testing of algorithms used in RTPSs. Therefore, the IAEA proposed more specific guidelines that provide a step-by-step recommendation for users at hospitals or cancer centres how to implement acceptance and commissioning procedures for newly purchased RTPSs. The current publication was developed in the framework of the Coordinated Research Project on Development of Procedures for Quality Assurance for Dosimetry Calculations in Radiotherapy and uses the International Electrotechnical Commission (IEC) standard IEC 62083, Requirements for the Safety of Radiotherapy Treatment Planning Systems as its basis. The report addresses the procedures for specification and acceptance testing of RTPSs to be used by both manufacturers and users at the hospitals. Recommendations are provided for specific tests to be performed at the manufacturing facility known as type tests, and for acceptance tests to be performed at the hospital known as site tests. The purpose of acceptance testing is to demonstrate to the

  10. Testing strong factorial invariance using three-level structural equation modeling

    Directory of Open Access Journals (Sweden)

    Suzanne eJak

    2014-07-01

    Full Text Available Within structural equation modeling, the most prevalent model to investigate measurement bias is the multigroup model. Equal factor loadings and intercepts across groups in a multigroup model represent strong factorial invariance (absence of measurement bias across groups. Although this approach is possible in principle, it is hardly practical when the number of groups is large or when the group size is relatively small. Jak, Oort and Dolan (2013 showed how strong factorial invariance across large numbers of groups can be tested in a multilevel structural equation modeling framework, by treating group as a random instead of a fixed variable. In the present study, this model is extended for use with three-level data. The proposed method is illustrated with an investigation of strong factorial invariance across 156 school classes and 50 schools in a Dutch dyscalculia test, using three-level structural equation modeling.

  11. Baby factories taint surrogacy in Nigeria.

    Science.gov (United States)

    Makinde, Olusesan Ayodeji; Makinde, Olufunmbi Olukemi; Olaleye, Olalekan; Brown, Brandon; Odimegwu, Clifford O

    2016-01-01

    The practice of reproductive medicine in Nigeria is facing new challenges with the proliferation of 'baby factories'. Baby factories are buildings, hospitals or orphanages that have been converted into places for young girls and women to give birth to children for sale on the black market, often to infertile couples, or into trafficking rings. This practice illegally provides outcomes (children) similar to surrogacy. While surrogacy has not been well accepted in this environment, the proliferation of baby factories further threatens its acceptance. The involvement of medical and allied health workers in the operation of baby factories raises ethical concerns. The lack of a properly defined legal framework and code of practice for surrogacy makes it difficult to prosecute baby factory owners, especially when they are health workers claiming to be providing services to clients. In this environment, surrogacy and other assisted reproductive techniques urgently require regulation in order to define when ethico-legal lines have been crossed in providing surrogacy or surrogacy-like services. Copyright © 2015 Reproductive Healthcare Ltd. Published by Elsevier Ltd. All rights reserved.

  12. Acceptance testing of Siemens e.cam SPECT system at the Korle-Bu Teaching Hospital

    International Nuclear Information System (INIS)

    Sosu, K. E.

    2006-01-01

    Acceptance testing has been performed on the Siemens e.cam Signature Series (Single Head) Single Photon Emission Computed Tomography (SPECT) system; the first of its kind, at the Nuclear Medicine Department, Korle-Bu Teaching Hospital, Accra. The various tests were performed according to NEMA NU 1 (2001) specifications as far as possible. The most important parameters that characterized the performance of the camera, gantry system, patient bed, collimators, computer system and fundamental software were evaluated based on visual inspection techniques. Various measuring instruments, different kinds of phantoms, point and flood sources containing 99m-Tc were also used for quantitative studies. Tests performed were divided into Physical inspection, intrinsic measurements (without collimator), extrinsic measurements (with collimator) and Single Photon Emission Computed Tomography (SPECT) system measurement. Some results obtained were better than factory specifications, others were within specifications. Other results obtained from this study which did not have factory specifications for comparison can serve as baseline for future measurements and quality control. Although not all the tests originally planned for could be done due to the non-availability of certain phantoms and radionuclide, it had been possible to perform sufficient and relevant tests to ensure that the system had no serious problems and that it can be used for clinical nuclear medicine imaging. (au)

  13. Two ways factorial design for round robin test of anemometers

    International Nuclear Information System (INIS)

    Cuerva, A.

    1998-01-01

    This work presents a way to carry out an inter-comparison between different cup anemometers that are tested in different wind tunnels. The method applied is known as Factorial design and allows determining the influence in the test of different factors in this case the anemometer itself and the wind tunnel where it is tested. (Author) 4 refs

  14. Two Ways Factorial Design for round robin test of anemometers

    Energy Technology Data Exchange (ETDEWEB)

    Cuerva, A.

    1998-07-01

    This work presents a way to carry out an inter-comparison between different cup anemometers that are tested in different wind tunnels. The method applied is known as Factorial design and allows determining the influence in the test of different factors in this case the anemometer itself and the wind tunnel where it is tested. (Author) 4 refs.

  15. Cone penetrometer acceptance test report

    Energy Technology Data Exchange (ETDEWEB)

    Boechler, G.N.

    1996-09-19

    This Acceptance Test Report (ATR) documents the results of acceptance test procedure WHC-SD-WM-ATR-151. Included in this report is a summary of the tests, the results and issues, the signature and sign- off ATP pages, and a summarized table of the specification vs. ATP section that satisfied the specification.

  16. Feasibility of testing local hidden variable theories in a Charm factory

    International Nuclear Information System (INIS)

    Li Junli; Qiao Congfeng

    2006-01-01

    It is commonly believed that the local hidden variable theories (LHVTs) can be tested through measuring the Bell inequalities. This scheme, for the massive particle system, was originally set up for the entangled K 0 K 0 pair system from the φ factory. In this paper we show that the J/Ψ→K 0 K 0 process is even more realistic for this goal. We analyze the unique properties of J/Ψ in the detection of basic quantum effects, and find that it is possible to use J/Ψ decay as a test of LHVTs in the future τ-charm factory. Our analyses and conclusions are generally also true for other heavy onium decays

  17. Displacement compressors - acceptance tests

    CERN Document Server

    International Organization for Standardization. Geneva

    1996-01-01

    ISO 1217:2009 specifies methods for acceptance tests regarding volume rate of flow and power requirements of displacement compressors. It also specifies methods for testing liquid-ring type compressors and the operating and testing conditions which apply when a full performance test is specified.

  18. The benefits of conducting factory performance tests for main mine fans

    Energy Technology Data Exchange (ETDEWEB)

    Ray, R.E.Jr. [PB Americas Inc., New York, NY (United States); Gamble, G.A. [Clarage Twin City Fan Co., Akron, OH (United States)

    2010-07-01

    Axial flow fans used in underground mining are also commonly used in subway tunnel ventilation fans to provide an evacuation path during a tunnel fire emergency. The axial flow fans provide sufficient air velocity to the fire site to prevent backlayering of smoke against the incoming airflow. Since the tunnels are used by the public, advance testing of fans and motors is conducted to confirm that the equipment will perform as specified during a fire. This paper discussed some of the advantages derived from conducting fan factory tests for tunnel projects that would also apply to mining applications. It also described other benefits from testing that are unique to mining. External factors that may cause the fan performance to vary considerably from the predicted performance measured at the factory were also discussed. These included air density changes and system effects produced by poorly designed shaft configurations and fan inlet ductwork. 11 refs., 6 figs.

  19. Tests of CPT invariance at neutrino factories

    International Nuclear Information System (INIS)

    Bilenky, Samoil M.; Freund, Martin; Lindner, Manfred; Ohlsson, Tommy; Winter, Walter

    2002-01-01

    We investigate possible tests of CPT invariance on the level of event rates at neutrino factories. We do not assume any specific model but phenomenological differences in the neutrino-antineutrino masses and mixing angles in a Lorentz invariance preserving context, such as could be induced by physics beyond the standard model. We especially focus on the muon neutrino and antineutrino disappearance channels in order to obtain constraints on the neutrino-antineutrino mass and mixing angle differences; we found, for example, that the sensitivity |m 3 -m(bar sign) 3 |(less-or-similar sign)1.9x10 -4 eV could be achieved

  20. Acceptance Testing Of Web Applications With Test Description Language

    Directory of Open Access Journals (Sweden)

    Łukasz Olek

    2014-01-01

    Full Text Available Acceptance tests are usually created by a client after a part of a system is implemented. However, some methodologies propose the elaboration of test cases before implementing a system. This approach increases the probability of system implementation that fulfills requirements, but may be problematic for customers and testers. To allow acceptance testing in such conditions, we propose to define test cases by recording them on an interactive mockup (a low detailed user-interface prototype. The paper focuses on Test Description Language, a notation used to store test cases.

  1. Photon Factory Activity Report, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    Photon Factory Activity Report no.12 deals with our activities in the period from October 1993 through September 1994. We operate two light sources at the Photon Factory; the 2.5-GeV Photon Factory storage ring, which is a dedicated light source, and the 6.5-GeV TRISTAN Accumulation Ring, which is parasitically used as a light source. We keep more than seventy experimental stations at two facilities, and accept experiments primarily according to approval by the Program Advisory Committee. The number of proposals to the Photon Factory has been still growing. Three-hundred eighty two proposals were approved by the PAC in FY1994, which is an increase by thirteen percent compared to the previous year. Remarkable was growth in biology proposals, particularly proposals in protein crystallography. In FY 1994, we accepted approximately 20,000 man-days as general users, and almost ten percent of them were from abroad. We always open the facility to users, not only domestic but also international. Recently we have been concentrating our effort to upgrading of the light sources and reconstruction of the experimental stations to keep the Photon Factory an attractive research facility in the forthcoming years. We have already started a program of reducing the emittance of the 2.5-GeV storage ring, which now operates with an emittance of 110 nm-rad, to 27 nm-rad by modifying the lattice, with the goal of operation at the reduced emittance in the fall of 1997. We also have conceived of a conversion of the TRISTAN Accumulation Ring to a dedicated light source of high energies. The on-going TRISTAN project will terminate by the end of 1995, and the TRISTAN Main Ring will be converted to a new B-Factory. At this moment, the TRISTAN Accumulation Ring will be disused as the injector to the Main Ring, and conversion of the AR to a dedicated light source becomes possible. (J.P.N.)

  2. Photon Factory Activity Report, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    Photon Factory Activity Report no.12 deals with our activities in the period from October 1993 through September 1994. We operate two light sources at the Photon Factory; the 2.5-GeV Photon Factory storage ring, which is a dedicated light source, and the 6.5-GeV TRISTAN Accumulation Ring, which is parasitically used as a light source. We keep more than seventy experimental stations at two facilities, and accept experiments primarily according to approval by the Program Advisory Committee. The number of proposals to the Photon Factory has been still growing. Three-hundred eighty two proposals were approved by the PAC in FY1994, which is an increase by thirteen percent compared to the previous year. Remarkable was growth in biology proposals, particularly proposals in protein crystallography. In FY 1994, we accepted approximately 20,000 man-days as general users, and almost ten percent of them were from abroad. We always open the facility to users, not only domestic but also international. Recently we have been concentrating our effort to upgrading of the light sources and reconstruction of the experimental stations to keep the Photon Factory an attractive research facility in the forthcoming years. We have already started a program of reducing the emittance of the 2.5-GeV storage ring, which now operates with an emittance of 110 nm-rad, to 27 nm-rad by modifying the lattice, with the goal of operation at the reduced emittance in the fall of 1997. We also have conceived of a conversion of the TRISTAN Accumulation Ring to a dedicated light source of high energies. The on-going TRISTAN project will terminate by the end of 1995, and the TRISTAN Main Ring will be converted to a new B-Factory. At this moment, the TRISTAN Accumulation Ring will be disused as the injector to the Main Ring, and conversion of the AR to a dedicated light source becomes possible. (J.P.N.)

  3. Photon Factory Activity Report, 1994

    International Nuclear Information System (INIS)

    1995-01-01

    Photon Factory Activity Report no.12 deals with our activities in the period from October 1993 through September 1994. We operate two light sources at the Photon Factory; the 2.5-GeV Photon Factory storage ring, which is a dedicated light source, and the 6.5-GeV TRISTAN Accumulation Ring, which is parasitically used as a light source. We keep more than seventy experimental stations at two facilities, and accept experiments primarily according to approval by the Program Advisory Committee. The number of proposals to the Photon Factory has been still growing. Three-hundred eighty two proposals were approved by the PAC in FY1994, which is an increase by thirteen percent compared to the previous year. Remarkable was growth in biology proposals, particularly proposals in protein crystallography. In FY 1994, we accepted approximately 20,000 man-days as general users, and almost ten percent of them were from abroad. We always open the facility to users, not only domestic but also international. Recently we have been concentrating our effort to upgrading of the light sources and reconstruction of the experimental stations to keep the Photon Factory an attractive research facility in the forthcoming years. We have already started a program of reducing the emittance of the 2.5-GeV storage ring, which now operates with an emittance of 110 nm-rad, to 27 nm-rad by modifying the lattice, with the goal of operation at the reduced emittance in the fall of 1997. We also have conceived of a conversion of the TRISTAN Accumulation Ring to a dedicated light source of high energies. The on-going TRISTAN project will terminate by the end of 1995, and the TRISTAN Main Ring will be converted to a new B-Factory. At this moment, the TRISTAN Accumulation Ring will be disused as the injector to the Main Ring, and conversion of the AR to a dedicated light source becomes possible. (J.P.N.)

  4. RISK ANALYSES USED IN ACCEPTANCE TESTING

    Directory of Open Access Journals (Sweden)

    Oxana STOROJ

    2016-06-01

    Full Text Available This article is talking about risk based testing approach in user acceptance testing UAT (User Acceptance Testing. There are presented definitions of risk and risk based testing. In addition, we are talking about risks that can appear during UAT and we are describing the process of testing based on risks. We propose some techniques and methods of identifying risks such as using Brainstorming, Delphi method,probability analysis method and others. Also, risk traceability matrix is presented as a method of prioritizing risks.

  5. Nitrogen trailer acceptance test report

    International Nuclear Information System (INIS)

    Kostelnik, A.J.

    1996-01-01

    This Acceptance Test Report documents compliance with the requirements of specification WHC-S-0249. The equipment was tested according to WHC-SD-WM-ATP-108 Rev.0. The equipment being tested is a portable contained nitrogen supply. The test was conducted at Norco's facility

  6. Acceptance Test Plan for ANSYS Software

    International Nuclear Information System (INIS)

    CREA, B.A.

    2000-01-01

    This plan governs the acceptance testing of the ANSYS software (Full Mechanical Release 5.5) for use on Project Word Management Contract (PHMC) computer systems (either UNIX or Microsoft Windows/NT). There are two phases to the acceptance testing covered by this test plan: program execution in accordance with the guidance provided in installation manuals; and ensuring results of the execution are consistent with the expected physical behavior of the system being modeled

  7. Baby Factories in Nigeria: Starting the Discussion Toward a National Prevention Policy.

    Science.gov (United States)

    Makinde, Olusesan Ayodeji; Olaleye, Olalekan; Makinde, Olufunmbi Olukemi; Huntley, Svetlana S; Brown, Brandon

    2017-01-01

    Baby factories and baby harvesting are relatively new terms that involve breeding, trafficking, and abuse of infants and their biological mothers. Since it was first described in a United Nations Educational, Scientific and Cultural Organization report in Nigeria in 2006, several more baby factories have been discovered over the years. Infertile women are noted to be major patrons of these baby factories due to the stigmatization of childless couples in Southern Nigeria and issues around cultural acceptability of surrogacy and adoption. These practices have contributed to the growth in the industry which results in physical, psychological, and sexual violence to the victims. Tackling baby factories will involve a multifaceted approach that includes advocacy and enacting of legislation barring baby factories and infant trafficking and harsh consequences for their patrons. Also, programs to educate young girls on preventing unwanted pregnancies are needed. Methods of improving awareness and acceptability of adoption and surrogacy and reducing the administrative and legal bottlenecks associated with these options for infertile couples should be explored to diminish the importance of baby factories. © The Author(s) 2015.

  8. Acceptance test procedure for High Pressure Water Jet System

    International Nuclear Information System (INIS)

    Crystal, J.B.

    1995-01-01

    The overall objective of the acceptance test is to demonstrate a combined system. This includes associated tools and equipment necessary to perform cleaning in the 105 K East Basin (KE) for achieving optimum reduction in the level of contamination/dose rate on canisters prior to removal from the KE Basin and subsequent packaging for disposal. Acceptance tests shall include necessary hardware to achieve acceptance of the cleaning phase of canisters. This acceptance test procedure will define the acceptance testing criteria of the high pressure water jet cleaning fixture. The focus of this procedure will be to provide guidelines and instructions to control, evaluate and document the acceptance testing for cleaning effectiveness and method(s) of removing the contaminated surface layer from the canister presently identified in KE Basin. Additionally, the desired result of the acceptance test will be to deliver to K Basins a thoroughly tested and proven system for underwater decontamination and dose reduction. This report discusses the acceptance test procedure for the High Pressure Water Jet

  9. NEVADA TEST SITE WASTE ACCEPTANCE CRITERIA

    International Nuclear Information System (INIS)

    U.S. DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION, NEVADA SITE OFFICE

    2005-01-01

    This document establishes the U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive and mixed waste for disposal. Mixed waste generated within the State of Nevada by NNSA/NSO activities is accepted for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the Nevada Test Site Area 3 and Area 5 Radioactive Waste Management Site for storage or disposal

  10. Cone penetrometer moisture probe acceptance test report

    International Nuclear Information System (INIS)

    Barnes, G.A.

    1996-01-01

    This Acceptance Test Report (ATR) documents the results of WHC-SD-WM-ATP-146 (Prototype Cone Penetrometer Moisture Probe Acceptance Test Procedure) and WHC-SD-WM-ATP-145 (Cone Penetrometer Moisture Probe Acceptance Test Procedure). The master copy of WHC-SD-WM-ATP-145 can be found in Appendix A and the master copy of WHC-SD-WM-ATP-146 can be found in Appendix B. Also included with this report is a matrix showing design criteria of the cone penetrometer moisture probe and the verification method used (Appendix C)

  11. Quantum mechanics paradoxes at the Φ-factory

    International Nuclear Information System (INIS)

    Ghirardi, G.C.; Grassi, R.; Weber, T.

    1991-04-01

    We discuss the possibility of performing experiments allowing one to test quantum mechanics versus any local realistic model within the context of the physics at the Φ-factory. After having sketched the main features of the physical process under consideration and having focused the locality requirements for it, we derive Bell's inequality for the two-meson system. Comparison with quantum predictions shows that the inequality is not violated for any choice of the parameters characterizing the measurement process. Contrary to the case of spin variables, there is then no way to exclude, by experiments at the Φ-factory, the possibility of a local realistic description of the process. A recent suggestion about a test of quantum predictions versus the assumption of a spontaneous factorization mechanism, as well as the claimed validity of an inequality which is different from Bell's one, are also discussed. The general conclusion is that the Φ-factory facility does not seem to open new ways of testing quantum mechanics versus alternative general schemes of the type which are usually regarded as worth considering the debate about locality and quantum mechanics. The concluding Section is devoted to making clear our position with respect to the problems discussed in this paper. It is pointed out that, in our opinion, the existing experimental evidence makes already clear that one has to accept the ''mysterious'' features of microscopic systems. The really crucial problem is that of investigating whether one can restore a coherent worldview which generally conforms with our experience at the macroscopic level, by keeping all highly successful predictions of quantum theory at the microscopic one. (author). 22 refs

  12. Acceptance test procedure for core sample trucks

    International Nuclear Information System (INIS)

    Smalley, J.L.

    1995-01-01

    The purpose of this Acceptance Test Procedure is to provide instruction and documentation for acceptance testing of the rotary mode core sample trucks, HO-68K-4600 and HO-68K-4647. The rotary mode core sample trucks were based upon the design of the second core sample truck (HO-68K-4345) which was constructed to implement rotary mode sampling of the waste tanks at Hanford. Acceptance testing of the rotary mode core sample trucks will verify that the design requirements have been met. All testing will be non-radioactive and stand-in materials shall be used to simulate waste tank conditions. Compressed air will be substituted for nitrogen during the majority of testing, with nitrogen being used only for flow characterization

  13. Acceptance test procedure for Project W-280

    International Nuclear Information System (INIS)

    Stites, C.G.

    1994-01-01

    This Document is the Acceptance Test Procedure for 200 Area C and SY Tank Farm Lighting Upgrade. This Acceptance Test Procedure has been prepared to demonstrate that the Tank Farm Lighting Systems function correctly as required by project criteria and as intended by design

  14. W-025, acceptance test report

    International Nuclear Information System (INIS)

    Roscha, V.

    1994-01-01

    This acceptance test report (ATR) has been prepared to establish the results of the field testing conducted on W-025 to demonstrate that the electrical/instrumentation systems functioned as intended by design. This is part of the RMW Land Disposal Facility

  15. L-286, Acceptance Test Record

    International Nuclear Information System (INIS)

    HARMON, B.C.

    2000-01-01

    This document provides a detailed account of how the acceptance testing was conducted for Project L-286, ''200E Area Sanitary Water Plant Effluent Stream Reduction''. The testing of the L-286 instrumentation system was conducted under the direct supervision

  16. Acceptance test report, 241-SY-101 Flexible Receiver System, Phase 1 testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1995-01-01

    This document summarizes the results of the Phase 1 acceptance test of the 241-SY-101 Flexible Receiver System (FRS). This acceptance test consisted of a pressure-decay/leak test of the containment bag to verify that the seams along the length of the bag had been adequately sealed. The sealing integrity of the FRS must be verified to ensure that the release of waste and aerosols will be minimized during the removal of the test mixer pump from Tank 241-SY-101. The FRS is one of six major components of the Equipment Removal System, which has been designed to retrieve, transport, and store the mixer pump. This acceptance test was performed at Lancs Industries in Kirkland, Washington on January 17, 1995. The bag temperature-compensated pressure loss of 575 Pa was below the acceptance criteria of 625 Pa and the test results were therefore found to be acceptable. The bag manufacturer estimates that 80--90% of the pressure loss is attributed to leakage around the bag inflation valve where the pressure gage was connected. A leak detector was applied over the entire bag during the pre-tests and no leakage was found. Furthermore, the leak rate corresponding to this pressure loss is very small when compared to the acceptable leak rate of the completely assembled FRS. The sealing integrity of the assembled FRS is verified in Phase 3 testing

  17. Understanding Student Teachers’ Behavioural Intention to Use Technology: Technology Acceptance Model (TAM Validation and Testing

    Directory of Open Access Journals (Sweden)

    Kung-Teck, Wong

    2013-01-01

    Full Text Available This study sets out to validate and test the Technology Acceptance Model (TAM in the context of Malaysian student teachers’ integration of their technology in teaching and learning. To establish factorial validity, data collected from 302 respondents were tested against the TAM using confirmatory factor analysis (CFA, and structural equation modelling (SEM was used for model comparison and hypotheses testing. The goodness-of-fit test of the analysis shows partial support of the applicability of the TAM in a Malaysian context. Overall, the TAM accounted for 37.3% of the variance in intention to use technology among student teachers and of the five hypotheses formulated, four are supported. Perceived usefulness is a significant influence on attitude towards computer use and behavioural intention. Perceived ease of use significantly influences perceived usefulness, and finally, behavioural intention is found to be influenced by attitude towards computer use. The findings of this research contribute to the literature by validating the TAM in the Malaysian context and provide several prominent implications for the research and practice of technology integration development.

  18. Nevada Test Site Waste Acceptance Criteria (NTSWAC)

    Energy Technology Data Exchange (ETDEWEB)

    NNSA/NSO Waste Management Project

    2008-06-01

    This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, Nevada Test Site Waste Acceptance Criteria (NTSWAC). The NTSWAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive (LLW) and LLW Mixed Waste (MW) for disposal.

  19. Nevada Test Site Waste Acceptance Criteria (NTSWAC)

    International Nuclear Information System (INIS)

    NNSA/NSO Waste Management Project

    2008-01-01

    This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, Nevada Test Site Waste Acceptance Criteria (NTSWAC). The NTSWAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive (LLW) and LLW Mixed Waste (MW) for disposal

  20. Muon Acceleration: Neutrino Factory and Beyond

    Energy Technology Data Exchange (ETDEWEB)

    Bogacz, Alex [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)

    2018-03-01

    We summarize the current state of a concept for muon acceleration aimed at a future Neutrino Factory and extendable to Higgs Factory. The main thrust of these studies was to reduce the overall cost while maintaining performance by exploring the interplay between the complexity of the cooling systems and the acceptance of the accelerator complex. To ensure adequate survival for the short-lived muons, acceleration must occur at high average gradient. The need for large transverse and longitudinal acceptances drives the design of the acceleration system to an initially low RF frequency, e.g., 325 MHz, which is then increased to 650 MHz as the transverse size shrinks with increasing energy. High-gradient normal conducting RF cavities at these frequencies require extremely high peak-power RF sources. Hence superconducting RF (SRF) cavities are chosen. We consider an SRF-efficient design based on a multi-pass (4.5) ?dogbone? RLA, extendable to multi-pass FFAG-like arcs.

  1. A conceptual design of circular Higgs factory

    Energy Technology Data Exchange (ETDEWEB)

    Cai, Yunhai

    2016-11-30

    Similar to a super B-factory, a circular Higgs factory (CHF) will require strong focusing systems near the interaction points and a low-emittance lattice in the arcs to achieve a factory luminosity. At electron beam energy of 125 GeV, beamstrahlung effects during the collision pose an additional challenge to the collider design. In particular, a large momentum acceptance at the 2% level is necessary to retain an adequate beam lifetime. This turns out to be the most challenging aspect in the design of a CHF. In this paper, an example will be provided to illustrate the beam dynamics in a CHF, emphasizing the chromatic optics. Basic optical modules and advanced analysis will be presented. Most importantly, we will show that 2% momentum aperture is achievable.

  2. Generator acceptance test and inspection report

    International Nuclear Information System (INIS)

    Johns, B.R.

    1997-01-01

    This Acceptance Test Report(ATR) is the completed testing and inspection of the new portable generator. The testing and inspection is to verify that the generator provided by the vendor meets the requirements of specification WHC-S-0252, Revision 2. Attached is various other documentation to support the inspection and testing

  3. User acceptance testing a step-by-step guide

    CERN Document Server

    Hambling, Brian

    2013-01-01

    Every information system brought into service in every type of organisation requires user acceptance testing. This book is a hands-on manual for non-testing specialists to plan and carry out an effective acceptance test of an information system. It also identifies ways of making the process as simple and cost-effective as possible.

  4. Tests of non-local interferences in kaon physics at asymmetric φ-factories

    International Nuclear Information System (INIS)

    Eberhard, P.H.

    1993-01-01

    Tests of non-local interference effects in the two-kaon system are proposed. The first kind of tests consists of measuring the amount of destructive interference between K S → K L regeneration processes of two distant kaons. The second kind deals with constructive interference. These tests could be performed at an asymmetric φ-factory. Estimates are given of the number of events predicted by orthodox quantum mechanics and kaon regeneration theory in various suitable experimental conditions. The impact on local theories if the predictions of quantum mechanics hold is discussed

  5. Acceptance test report, 241-SY-101 Flexible Receiver System, Phase 3 testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1995-01-01

    This document summarizes the results of the phase 3 acceptance test of the 241-SY-101 Flexible Receiver System (FRS). The purpose of this acceptance test is to verify the sealing integrity of the FRS to ensure that the release of waste and aerosols will be minimized during the removal of the test mixer pump from Tank 241-SY-101. The FRS is one of six major components of the Equipment Removal System, which has been designed to retrieve, transport, and store the mixer pump. This acceptance test was performed at the 306E Facility in the 300 area from January 10, 1995 to January 17, 1995. The Phase 3 test consisted of two parts. Part one was a water leak test of the seal between the blast shield and mock load distribution frame (LDF) to ensure that significant contamination of the pump pit and waste interaction with the aluminum impact-limiting material under the LDF are prevented during the pump removal operation. The second part of this acceptance test was an air leak test of the assembled flexible receiver system. The purpose of this test was to verify that the release of hazardous aerosols will be minimized if the tank dome pressure becomes slightly positive during the decontamination of the mixer pump

  6. Nevada Test Site Waste Acceptance Criteria

    International Nuclear Information System (INIS)

    U.S. Department of Energy, Nevada Operations Office, Waste Acceptance Criteria

    1999-01-01

    This document provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the Nevada Test Site

  7. Void fraction instrument acceptance test procedure

    International Nuclear Information System (INIS)

    Stokes, T.I.; Pearce, K.L.

    1994-01-01

    This document presents the results of the acceptance test for the mechanical and electrical features (not specifically addressed by the software ATP) of the void fraction instrument (VFI). Acceptance testing of the VFI, control console, and decontamination spray assembly was conducted in the 306E building high bay and area adjacent to the facility. The VFI was tested in the horizontal position supported in multiple locations on rolling tables. The control console was located next to the VFI pneumatic control assembly. The VFI system was operated exactly as is expected in the tank farm, with the following exceptions: power was provided from a building outlet and the VFI was horizontal. The testing described in this document verifies that the mechanical and electrical features are operating as designed and that the unit is ready for field service

  8. Acceptance Test Report for 241-U compressed air system

    International Nuclear Information System (INIS)

    Freeman, R.D.

    1994-01-01

    This Acceptance Test Report (ATR) documents the results of acceptance testing of a newly upgraded compressed air system at 241-U Farm. The system was installed and the test successfully performed under work package 2W-92-01027

  9. Nevada Test Site Waste Acceptance Criteria, December 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-12-01

    This document establishes the US Department of Energy, Nevada Operations Office waste acceptance criteria. The waste acceptance criteria provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive waste and mixed waste for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the Nevada Test Site Area 3 and Area 5 Radioactive Waste Management Sites for storage or disposal.

  10. Nevada Test Site Waste Acceptance Criteria, December 2000

    International Nuclear Information System (INIS)

    2000-01-01

    This document establishes the US Department of Energy, Nevada Operations Office waste acceptance criteria. The waste acceptance criteria provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive waste and mixed waste for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the Nevada Test Site Area 3 and Area 5 Radioactive Waste Management Sites for storage or disposal

  11. Acceptance test report for project C-157 ''T-Plant electrical upgrade''

    International Nuclear Information System (INIS)

    Jeppson, L.A.

    1997-01-01

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per WHC-SD-Cl57-ATP-001, Rev. 0, ''Acceptance Test Proceedure for Project C-157 'T Plant Electrical Upgrade''' The test was completed and approved without any problems or exceptions

  12. Acceptance test report for project C-157 ``T-Plant electrical upgrade``

    Energy Technology Data Exchange (ETDEWEB)

    Jeppson, L.A.

    1997-08-05

    This Acceptance Test Report (ATR) documents for record purposes the field results, acceptance, and approvals of the completed acceptance test per WHC-SD-Cl57-ATP-001, Rev. 0, ``Acceptance Test Proceedure for Project C-157 `T Plant Electrical Upgrade``` The test was completed and approved without any problems or exceptions.

  13. Behavioral and Personality Predictors of Acceptance and Rejection in University

    Directory of Open Access Journals (Sweden)

    Daniel Bartholomeu

    Full Text Available Abstract: Acceptance and rejection in the group are related to both personality characteristics and social skills and most studies focus on children instead of college students. The objective of this study was to investigate whether acceptance and rejection would be more associated with personality tendencies, specifically socialization or social skills. We collected data from 187 college students attending the Physical Education (67% and Psychology (32% courses. The instruments were the sociometric test, the Factorial Scale of Socialization and the Social Skills Inventory. A moderating effect of gender in the relationship between assertiveness and acceptance and rejection to go out on college was observed. Social skills were better predictors of acceptance and social rejection in the university group.

  14. Acceptance test report for core sample trucks 3 and 4

    International Nuclear Information System (INIS)

    Corbett, J.E.

    1996-01-01

    The purpose of this Acceptance Test Report is to provide documentation for the acceptance testing of the rotary mode core sample trucks 3 and 4, designated as HO-68K-4600 and HO-68K-4647, respectively. This report conforms to the guidelines established in WHC-IP-1026, ''Engineering Practice Guidelines,'' Appendix M, ''Acceptance Test Procedures and Reports.'' Rotary mode core sample trucks 3 and 4 were based upon the design of the second core sample truck (HO-68K-4345) which was constructed to implement rotary mode sampling of the waste tanks at Hanford. Successful completion of acceptance testing on June 30, 1995 verified that all design requirements were met. This report is divided into four sections, beginning with general information. Acceptance testing was performed on trucks 3 and 4 during the months of March through June, 1995. All testing was performed at the ''Rock Slinger'' test site in the 200 West area. The sequence of testing was determined by equipment availability, and the initial revision of the Acceptance Test Procedure (ATP) was used for both trucks. Testing was directed by ICF-KH, with the support of WHC Characterization Equipment Engineering and Characterization Project Operations. Testing was completed per the ATP without discrepancies or deviations, except as noted

  15. Estructura factorial y consistencia interna de una versión española del Purpose-In-Life Test / Factorial Structure and Internal Consistency of a Spanish Version of the Purpose-In-Life Test

    Directory of Open Access Journals (Sweden)

    Joaquín García-Alandete

    2013-06-01

    Full Text Available El objetivo de este trabajo fue examinar la estructura factorial y la consistencia interna de la versión española del Purpose-In-Life Test, instrumento que mide el logro de sentido de la vida desde los supuestos de la logoterapia. En el estudio participaron 457 universitarios españoles (320 mujeres, 137 hombres de 18 a 55 años de edad, M = 21.80, DE = 4.56. Se realizaron análisis descriptivos y correlaciones entre los ítems y el total de la escala inicial, un análisis factorial exploratorio, la estimación de la consistencia interna de los factores y de la escala obtenida, el análisis factorial confirmatorio de la misma, la prueba t para comparación de medias entre mujeres y hombres y la prueba de Kruskal-Wallis para el efecto de la edad. Los resultados mostraron una estructura de dos factores correlacionados con aceptable consistencia interna de la escala y de los factores, diferencias significativas entre mujeres y hombres en la puntuación total y uno de los factores, y no significativas en función de la edad. El análisis factorial confirmatorio muestra un adecuado ajuste, apoyando el modelo propuesto.

  16. 105K West Isolation Barrier Acceptance Test results

    International Nuclear Information System (INIS)

    McCracken, K.J.; Irwin, J.J.

    1995-01-01

    The objective of this document is to report and interpret the findings of the isolation barrier acceptance tests performed in 105KW/100K. The tests were performed in accordance with the test plan and acceptance test procedure. The test report contains the test data. This document compares the test data against the criteria. A discussion of the leak rate analytical characterization describes how the flow characteristics flow rate will be determined using the test data from the test report. Two modes of water loss were considered; basin and/or discharge chute leakage, and evaporation. An initial test established baseline leakage data and instrumentation performance. Test 2 evaluated the sealing performance of the isolation barrier by inducing an 11 in. (27.9 cm) level differential across the barrier. The leak rate at this 11 in. (27.9 cm) level is extrapolated to the 16 ft. (4.9 m) level differential postulated in the DBE post seismic event. If the leak rate, adjusted for evaporation and basin leakage (determined from Test 1), is less than the SAR limit of 1,500 gph (5,680 lph) at a 16 ft (4.9 m) level differential, the barriers pass the acceptance test

  17. Performance tests of a 2-meter grasshopper monochromator at photon factory

    International Nuclear Information System (INIS)

    Yanagihara, Mihiro; Maezawa, Hideki; Sasaki, Taizo; Suzuki, Yoshio; Iguchi, Yasuo.

    1984-12-01

    A 2-meter grasshopper monochromator was installed and adjusted at BL-11A in Photon Factory, and performance tests were carried out. The usable photon energy range for the monochromator is 90 to 1000 eV for a 2400 grooves/mm grating, and the flux is 10 8 - 10 9 photons/sec for entrance and exit slit widths of 15 μm. A resolving power of about 2000 is realized at 250 eV for this slit width. (author)

  18. Statistical analysis of weld bead geometry in Ti6Al4V laser cladding. Comparison of central composite design and five step full factorial test plan

    Energy Technology Data Exchange (ETDEWEB)

    Marko, Angelina [Fraunhofer Institute for Production Systems and Design Technology IPK, Berlin (Germany); Graf, Benjamin; Rethmeier, Michael [Fraunhofer Institute for Production Systems and Design Technology IPK, Berlin (Germany). Dept. for Joining and Coating Technology

    2017-11-01

    The process of laser cladding has become more important during recent years because of its broad application for cladding, repair or additive manufacturing. In the field of mechanical engineering, one use is the repair of turbine blades. For high quality and reliability of the repaired components, it is necessary to adjust the weld bead geometry to the specific repair task. The bead geometry influences the metallurgical bonding and the degree of dilution as well as the formation of defects like pores or cracks. Therefore, it is important to know the effects of the different parameters on the welding bead. A valuable tool to meet this industrial challenge is the design of experiments (DoE). In this context, the user can choose between a huge number of test plans. Greater profit of information is expected by a larger test range. In order to confirm the acceptance, a five-step full factorial test plan is compared to a central composite design in this paper. Moreover, the limits of the experimental range are indicated and restrictions can be derived. As the results show, the essential effects are detected with a full factorial test plan as well as with a central composite design. Merely the effect strength could not always be specified unambiguously. On this account and in consideration of cost efficiency, the use of central compound design is recommended in industrial applications.

  19. Statistical analysis of weld bead geometry in Ti6Al4V laser cladding. Comparison of central composite design and five step full factorial test plan

    International Nuclear Information System (INIS)

    Marko, Angelina; Graf, Benjamin; Rethmeier, Michael

    2017-01-01

    The process of laser cladding has become more important during recent years because of its broad application for cladding, repair or additive manufacturing. In the field of mechanical engineering, one use is the repair of turbine blades. For high quality and reliability of the repaired components, it is necessary to adjust the weld bead geometry to the specific repair task. The bead geometry influences the metallurgical bonding and the degree of dilution as well as the formation of defects like pores or cracks. Therefore, it is important to know the effects of the different parameters on the welding bead. A valuable tool to meet this industrial challenge is the design of experiments (DoE). In this context, the user can choose between a huge number of test plans. Greater profit of information is expected by a larger test range. In order to confirm the acceptance, a five-step full factorial test plan is compared to a central composite design in this paper. Moreover, the limits of the experimental range are indicated and restrictions can be derived. As the results show, the essential effects are detected with a full factorial test plan as well as with a central composite design. Merely the effect strength could not always be specified unambiguously. On this account and in consideration of cost efficiency, the use of central compound design is recommended in industrial applications.

  20. Acceptance test report: Backup power system

    International Nuclear Information System (INIS)

    Cole, D.B.

    1996-01-01

    Acceptance Test Report for construction functional testing of Project W-030 Backup Power System. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. Backup power includes a single 125 KW diesel generator, three 10-kva uninterruptible power supply units, and all necessary control

  1. Acceptance test report, 241-SY-101 Flexible Receiver System, Phase 2 testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1995-01-01

    This document summarizes the results of the Phase 2 acceptance test of the 241-SY-101 Flexible Receiver System (FRS). The FRS is one of six major components of the Equipment Removal System, which has been designed to retrieve, transport, and store the test mixer pump currently installed in Tank 241-SY-101. The purpose of this acceptance test is to verify the strength of the containment bag and bag bottom cinching mechanism. It is postulated that 68 gallons of waste could be trapped inside the pump internals. The bag must be capable of supporting this waste if it shakes loose and drains to the bottom of the bag after the bag bottom has been cinched closed. This acceptance test was performed at the Maintenance and Storage Facility (MASF) Facility in the 400 area on January 23, 1995. The bag assembly supported the weight of 920 kg (2,020 lbs) of water with no leakage or damage to the bag. This value meets the acceptance criteria of 910 kg of water and therefore the results were found to be acceptable. The maximum volume of liquid expected to be held up in the pump internals is 258 L (68 gallons), which corresponds to 410 kg. This test weight gives just over a safety factor of 2. The bag also supported a small shock load while it was filled with water when the crane hoisted the bag assembly up and down. Based on the strength rating of the bag components, the bag assembly should support 2--3 times the test weight of 910 kg

  2. Acceptance of Colonoscopy Requires more than Test Tolerance

    Directory of Open Access Journals (Sweden)

    Amanda Condon

    2008-01-01

    Full Text Available BACKGROUND: Colon cancer screening, including colonoscopy, lags behind other forms of cancer screening for participation rates. The intrinsic nature of the endoscopic procedure may be an important barrier that limits patients from finding this test acceptable and affects willingness to undergo screening. With colon cancer screening programs emerging in Canada, test characteristics and their impact on acceptance warrant consideration.

  3. Multiport riser and flange assemblies acceptance test report

    International Nuclear Information System (INIS)

    Precechtel, D.R.; Schroeder, B.K.

    1994-01-01

    This document presents the results of the acceptance test for the multiport riser (MPR) and multiport flange (MPF) assemblies. The accepted MPR and MPF assemblies will be used in support of the hydrogen mitigation project for double-shell waste tank 241-SY-101 and other related projects. The testing described in this document verifies that the mechanical and interface features are operating as designed and that the unit is ready for field service. The objectives of the acceptance testing were as follows: Basic equipment functions and mechanical interfaces were verified; Installation and removal of equipment were demonstrated to the degree possible; Operation of the decon spray system and all valving was confirmed; and the accumulated leak rate of the MPR and MPF assemblies was determined

  4. Acceptance test report 2721-Z upgrades

    International Nuclear Information System (INIS)

    Keck, R.D.

    1998-01-01

    This test procedure provides instructions for acceptance testing of modifications to the 2721-Z diesel-generator system made by Project C-189. The modifications include (1) replacing the generator NUMA-LOGIC controller with connection to the PFP distributed control system (DCS), (2) replacing ATSI with a breaker switching scheme for 2736-ZB backup power and (3) providing a method for generator load and system testing

  5. MITS Data Acquisition Subsystem Acceptance Test procedure

    International Nuclear Information System (INIS)

    Allison, R.

    1980-01-01

    This is an acceptance procedure for the Data Acquisition Subsystem of the Machine Interface Test System (MITS). Prerequisites, requirements, and detailed step-by-step instruction are presented for inspecting and performance testing the subsystem

  6. Acceptance test report MICON software exhaust fan control

    International Nuclear Information System (INIS)

    Keck, R.D.

    1998-01-01

    This test procedure specifies instructions for acceptance testing of software for exhaust fan control under Project ESPT (Energy Savings Performance Contract). The software controls the operation of two emergency exhaust fans when there is a power failure. This report details the results of acceptance testing for the MICON software upgrades. One of the modifications is that only one of the emergency fans will operate at all times. If the operating fan shuts off or fails, the other fan will start and the operating fan will be stopped

  7. Initial acceptance test experience with FFTF plant equipment

    International Nuclear Information System (INIS)

    Brown, R.K.; Coleman, K.A.; Mahaffey, M.K.; McCargar, C.G.; Young, M.W.

    1978-09-01

    The purpose of this paper is to examine the initial acceptance test experience of certain pieces of auxiliary equipment of the Fast Flux Test Facility (FFTF). The scope focuses on the DHX blowers and drive train, inert gas blowers, H and V containment isolation valves, and the Surveillance and In-service Inspection (SISI) transporter and trolley. For each type of equipment, the discussion includes a summary of the design and system function, installation history, preoperational acceptance testing procedures and results, and unusual events and resolutions

  8. Breathing air trailer acceptance test report

    International Nuclear Information System (INIS)

    Kostelnik, A.J.

    1996-01-01

    This Acceptance Test Report documents compliance with the requirements of specification WHC-S-0251, Rev.0 and ECNs 613530 and 606113. The equipment was tested according to WHC-SD-WM-ATP-104. The equipment tested is a Breathing Air Supply Trailer purchased as a design and fabrication procurement activity. The ATP was written by the Seller and was performed by the Seller with representatives of the Westinghouse Hanford Company witnessing portions of the test at the Seller's location

  9. Acceptance test procedure for the 105-KW isolation barrier leak rate

    International Nuclear Information System (INIS)

    McCracken, K.J.

    1995-01-01

    This acceptance test procedure shall be used to: First establish a basin water loss rate prior to installation of the two isolation barriers between the main basin and the discharge chute in K-Basin West. Second, perform an acceptance test to verify an acceptable leakage rate through the barrier seals. This Acceptance Test Procedure (ATP) has been prepared in accordance with CM-6-1 EP 4.2, Standard Engineering Practices

  10. W-087 Acceptance test procedure. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Joshi, A.W.

    1997-06-10

    This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks.

  11. W-087 Acceptance test procedure. Revision 1

    International Nuclear Information System (INIS)

    Joshi, A.W.

    1997-01-01

    This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks

  12. Surface moisture measurement system hardware acceptance test procedure

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1996-01-01

    The purpose of this acceptance test procedure is to verify that the mechanical and electrical features of the Surface Moisture Measurement System are operating as designed and that the unit is ready for field service. This procedure will be used in conjunction with a software acceptance test procedure, which addresses testing of software and electrical features not addressed in this document. Hardware testing will be performed at the 306E Facility in the 300 Area and the Fuels and Materials Examination Facility in the 400 Area. These systems were developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks

  13. Nevada Test Site Waste Acceptance Criteria

    International Nuclear Information System (INIS)

    U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2005-01-01

    This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive (LLW) and mixed waste (MW) for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex (RWMC) for storage or disposal

  14. Standardization of waste acceptance test methods by the Materials Characterization Center

    International Nuclear Information System (INIS)

    Slate, S.C.

    1985-01-01

    This paper describes the role of standardized test methods in demonstrating the acceptability of high-level waste (HLW) forms for disposal. Key waste acceptance tests are standardized by the Materials Characterization Center (MCC), which the US Department of Energy (DOE) has established as the central agency in the United States for the standardization of test methods for nuclear waste materials. This paper describes the basic three-step process that is used to show that waste is acceptable for disposal and discusses how standardized tests are used in this process. Several of the key test methods and their areas of application are described. Finally, future plans are discussed for using standardized tests to show waste acceptance. 9 refs., 1 tab

  15. Diesel generator trailer acceptance test procedure

    International Nuclear Information System (INIS)

    Kostelnik, A.J.

    1994-01-01

    This Acceptance Test Procedure (ATP) will document compliance with the requirements of WHC-S-0252 Rev. 1 and ECNs 609271, and 609272. The equipment being tested is a 150KW Diesel Generator mounted on a trailer with switchgear. The unit was purchased as a Design and Fabrication procurement activity. The ATP was written by the Seller and will be performed by the Seller with representatives of the Westinghouse Hanford Company witnessing the test at the Seller's location

  16. PUREX SAMCONS uninterruptible power supply (UPS) acceptance test report

    International Nuclear Information System (INIS)

    Blackaby, W.B.

    1997-01-01

    This Acceptance Test Report for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) Acceptance Test Procedure validates the operation of the UPS, all alarming and display functions and the ability of the UPS to supply power to the SAMCONS as designed. The proper installation of the PUREX SAMCONS Trailer UPS components and wiring will be systematically evaluated by performance of this procedure. Proper operation of the SAMCONS computer UPS will be verified by performance of a timed functional load test, and verification of associated alarms and trouble indications. This test procedure will be performed in the SAMCONS Trailer and will include verification of receipt of alarms at the SAMCONS computer stations. This test may be performed at any time after the completion of HNF-SD-CP-ATP-083, PUREX Surveillance and Monitoring and Control System (SAMCONS) Acceptance Test Procedure, when computer display and alarm functions have been proven to operate correctly

  17. Virtual Learning Factory on VR-Supported Factory Planning

    OpenAIRE

    Weidig , Christian; Menck , Nicole; Winkes , Pascal ,; Aurich , Jan ,

    2014-01-01

    Part 13: Virtual Reality and Simulation; International audience; Learning Factories are becoming popular as tangible measures to teach engineering methods while making use of them in an industrial-like environment. Their core component is usually a factory demonstrator, users are physically working with. For factory planning such approaches can hardly be adapted, due to long lasting realization phases.To overcome this obstacle a virtual learning factory has been developed whose core component...

  18. Acceptance test report for the AY-102 ENRAF densitometer

    International Nuclear Information System (INIS)

    Huber, J.H.

    1998-01-01

    On February 11, 1998, the AY-1 02, Riser 15E ENRAF Densitometer was acceptance tested per HNF-SD-WM-ATP-077. The test was performed at the Department of Energy's Hanford Site, 200 East Area, building MO-407. The test validated the functionality of the Densitometer for use by project W-320, C-1 06 Retrieval. The purpose of the test procedure was to verify the functionality of the ENRAF Series 854 ATG densitometer. Typically, all ENRAF Series 854 ATGs are acceptance tested before transport to the field. The ATP, as performed for level gauges, sets default program values within the gauge and verifies the gauge's force transducer calibration

  19. Evaluation of acceptance strength tests for concrete pavements.

    Science.gov (United States)

    2005-06-30

    The North Carolina Department of Transportation has used traditionally flexural strength tests for acceptance : testing of Portland cement concrete pavements. This report summarizes a research project implemented to : investigate the feasibility of u...

  20. Nevada test site waste acceptance criteria

    International Nuclear Information System (INIS)

    1996-01-01

    This document provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the NTS. Review each section of this document. This document is not intended to include all of the requirements; rather, it is meant as a guide toward meeting the regulations. All references in this document should be observed to avoid omission of requirements on which acceptance or rejection of waste will be based. The Department of Energy/Nevada Operations Office (DOE/NV) and support contractors are available to assist you in understanding or interpreting this document

  1. Nevada test site waste acceptance criteria

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    This document provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the NTS. Review each section of this document. This document is not intended to include all of the requirements; rather, it is meant as a guide toward meeting the regulations. All references in this document should be observed to avoid omission of requirements on which acceptance or rejection of waste will be based. The Department of Energy/Nevada Operations Office (DOE/NV) and support contractors are available to assist you in understanding or interpreting this document.

  2. Acceptance test report: Field test of mixer pump for 241-AN-107 caustic addition project

    International Nuclear Information System (INIS)

    Leshikar, G.A.

    1997-01-01

    The field acceptance test of a 75 HP mixer pump (Hazleton serial number N-20801) installed in Tank 241-AN-107 was conducted from October 1995 thru February 1996. The objectives defined in the acceptance test were successfully met, with two exceptions recorded. The acceptance test encompassed field verification of mixer pump turntable rotation set-up and operation, verification that the pump instrumentation functions within established limits, facilitation of baseline data collection from the mixer pump mounted ultrasonic instrumentation, verification of mixer pump water flush system operation and validation of a procedure for its operation, and several brief test runs (bump) of the mixer pump

  3. Neutron absorber qualification and acceptance testing from the designer's perspective

    International Nuclear Information System (INIS)

    Bracey, W.; Chiocca, R.

    2004-01-01

    Starting in the mid 1990's, the USNRC began to require less than 100% credit for the 10B present in fixed neutron absorbers spent fuel transport packages. The current practice in the US is to use only 75% of the specified 10B in criticality safety calculations unless extensive acceptance testing demonstrates both the presence of the 10B and uniformity of its distribution. In practice, the NRC has accepted no more than 90% credit for 10B in recent years, while other national competent authorities continue to accept 100%. More recently, with the introduction of new neutron absorber materials, particularly aluminum / boron carbide metal matrix composites, the NRC has also expressed expectations for qualification testing, based in large part on Transnuclear's successful application to use a new composite material in the TN-68 storage / transport cask. The difficulty is that adding more boron than is really necessary to a metal has some negative effects on the material, reducing the ductility and the thermal conductivity, and increasing the cost. Excessive testing requirements can have the undesired effect of keeping superior materials out of spent fuel package designs, without a corresponding justification based on public safety. In European countries and especially in France, 100% credit has been accepted up to now with materials controls specified in the Safety Analysis Report (SAR): Manufacturing process approved by qualification testing Materials manufacturing controlled under a Quality Assurance system. During fabrication, acceptance testing directly on products or on representative samples. Acceptance criteria taking into account a statistical uncertainty corresponding to 3σ. The original and current bases for the reduced 10 B credit, the design requirements for neutron absorber materials, and the experience of Transnuclear and Cogema Logistics with neutron absorber testing are examined. Guidelines for qualification and acceptance testing and process controls

  4. Acceptance test procedure, 241-SY-101 Flexible Receiver System, Phase III testing

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1994-01-01

    This Acceptance Test Procedure is for the 241-SY-101 Flexible Receiver System, Phase III Testing. This procedure will test the sealing integrity of the Flexible Receiver System to ensure that release of waste and aerosols will be minimized during the removal of the test mixer pump from tank SY-101

  5. Acceptability of HIV self-testing: a systematic literature review.

    Science.gov (United States)

    Krause, Janne; Subklew-Sehume, Friederike; Kenyon, Chris; Colebunders, Robert

    2013-08-08

    The uptake of HIV testing and counselling services remains low in risk groups around the world. Fear of stigmatisation, discrimination and breach of confidentiality results in low service usage among risk groups. HIV self-testing (HST) is a confidential HIV testing option that enables people to find out their status in the privacy of their homes. We evaluated the acceptability of HST and the benefits and challenges linked to the introduction of HST. A literature review was conducted on the acceptability of HST in projects in which HST was offered to study participants. Besides acceptability rates of HST, accuracy rates of self-testing, referral rates of HIV-positive individuals into medical care, disclosure rates and rates of first-time testers were assessed. In addition, the utilisation rate of a telephone hotline for counselling issues and clients` attitudes towards HST were extracted. Eleven studies met the inclusion criteria (HST had been offered effectively to study participants and had been administered by participants themselves) and demonstrated universally high acceptability of HST among study populations. Studies included populations from resource poor settings (Kenya and Malawi) and from high-income countries (USA, Spain and Singapore). The majority of study participants were able to perform HST accurately with no or little support from trained staff. Participants appreciated the confidentiality and privacy but felt that the provision of adequate counselling services was inadequate. The review demonstrates that HST is an acceptable testing alternative for risk groups and can be performed accurately by the majority of self-testers. Clients especially value the privacy and confidentiality of HST. Linkage to counselling as well as to treatment and care services remain major challenges.

  6. Acceptance test report for the Westinghouse 100 ton hydraulic trailer

    International Nuclear Information System (INIS)

    Barrett, R.A.

    1995-01-01

    The SY-101 Equipment Removal System 100 Ton Hydraulic Trailer was designed and built by KAMP Systems, Inc. Performance of the Acceptance Test Procedure at KAMP's facility in Ontario, California (termed Phase 1 in this report) was interrupted by discrepancies noted with the main hydraulic cylinder. The main cylinder was removed and sent to REMCO for repair while the trailer was sent to Lampson's facility in Pasco, Washington. The Acceptance Test Procedure was modified and performance resumed at Lampson (termed Phase 2 in this report) after receipt of the repaired cylinder. At the successful conclusion of Phase 2 testing the trailer was accepted as meeting all the performance criteria specified

  7. Surface moisture measurement system acceptance testing work plan

    International Nuclear Information System (INIS)

    Ritter, G.A.

    1996-01-01

    This work plan addresses testing of the Surface Moisture Measurement System (SMMS) at the Fuels and Materials Examination Facility (FMEF). The purpose of this plan is to define the scope of work, identify organizational responsibilities, describe test control requirements, and provide estimated costs and schedule associated with acceptance testing

  8. Acceptance Test Report for the 241-AZ-101 Ultrasonic Interface Level Analyzer

    International Nuclear Information System (INIS)

    ANDREWS, J.E.

    2000-01-01

    This document comprises the Acceptance Test Report for the 241-AZ-101 Ultrasonic Interface Level Analyzer. This document presents the results of Acceptance Testing of the 241-AZ-101 Ultrasonic Interface Level Analyzers (URSILLAs). Testing of the URSILLAs was performed in accordance with ATP-260-001, ''URSILLA Pre-installation Acceptance Test Procedure''. The objective of the testing was to verify that all equipment and components function in accordance with design specifications and original equipment manufacturer's specifications

  9. WRAP low level waste (LLW) glovebox acceptance test report

    International Nuclear Information System (INIS)

    Leist, K.J.

    1998-01-01

    In June 28, 1997, the Low Level Waste (LLW) glovebox was tested using glovebox acceptance test procedure 13031A-85. The primary focus of the glovebox acceptance test was to examine control system interlocks, display menus, alarms, and operator messages. Limited mechanical testing involving the drum ports, hoists, drum lifter, compacted drum lifter, drum tipper, transfer car, conveyors, lidder/delidder device and the supercompactor were also conducted. As of November 24, 1997, 2 of the 131 test exceptions that affect the LLW glovebox remain open. These items will be tracked and closed via the WRAP Master Test Exception Database. As part of Test Exception resolution/closure the responsible individual closing the Test Exception performs a retest of the affected item(s) to ensure the identified deficiency is corrected, and, or to test items not previously available to support testing. Test Exceptions are provided as appendices to this report

  10. W-026, transuranic waste (TRU) glovebox acceptance test report

    International Nuclear Information System (INIS)

    Leist, K.J.

    1998-01-01

    On July 18, 1997, the Transuranic (TRU) glovebox was tested using glovebox acceptance test procedure 13021A-86. The primary focus of the glovebox acceptance test was to examine control system interlocks, display menus, alarms, and operator messages. Limited mechanical testing involving the drum ports, hoists, drum lifter, compacted drum lifter, drum tipper, transfer car, conveyors, sorting table, lidder/delidder device and the TRU empty drum compactor were also conducted. As of February 25, 1998, 10 of the 102 test exceptions that affect the TRU glovebox remain open. These items will be tracked and closed via the WRAP Master Test Exception Database. As part of Test Exception resolution/closure the responsible individual closing the Test Exception performs a retest of the affected item(s) to ensure the identified deficiency is corrected, and, or to test items not previously available to support testing. Test exceptions are provided as appendices to this report

  11. WRAP low level waste (LLW) glovebox acceptance test report

    Energy Technology Data Exchange (ETDEWEB)

    Leist, K.J.

    1998-02-17

    In June 28, 1997, the Low Level Waste (LLW) glovebox was tested using glovebox acceptance test procedure 13031A-85. The primary focus of the glovebox acceptance test was to examine control system interlocks, display menus, alarms, and operator messages. Limited mechanical testing involving the drum ports, hoists, drum lifter, compacted drum lifter, drum tipper, transfer car, conveyors, lidder/delidder device and the supercompactor were also conducted. As of November 24, 1997, 2 of the 131 test exceptions that affect the LLW glovebox remain open. These items will be tracked and closed via the WRAP Master Test Exception Database. As part of Test Exception resolution/closure the responsible individual closing the Test Exception performs a retest of the affected item(s) to ensure the identified deficiency is corrected, and, or to test items not previously available to support testing. Test Exceptions are provided as appendices to this report.

  12. Gas characterization system software acceptance test procedure

    International Nuclear Information System (INIS)

    Vo, C.V.

    1996-01-01

    This document details the Software Acceptance Testing of gas characterization systems. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases

  13. Acceptance test for graphite components and construction status of HTTR

    International Nuclear Information System (INIS)

    Iyoku, T.; Ishihara, M.; Maruyama, S.; Shiozawa, S.; Tsuji, N.; Miki, T.

    1996-01-01

    In March, 1991, the Japan Atomic Energy Research Institute (JAERI) started to constructed the High Temperature engineering Test Reactor(HTTR) which is a 30-MW(thermal) helium gas-cooled reactor with a core composed of prismatic graphite blocks piled on the core support graphite structures. Two types of graphite materials are used in the HTTR. One is the garde IG-110, isotropic fine grain graphite, another is the grade PGX, medium-to-fine grained molded graphite. These materials were selected on the basis of the appropriate properties required by the HTTR reactor design. Industry-wide standards for an acceptance test of graphite materials used as main components of a nuclear reactor had not been established. The acceptance standard for graphite components of the HTTR, therefore, was drafted by JAERI and reviewed by specialists outside JAERI. The acceptance standard consists of the material testing, non-destructive examination such as the ultrasonic and eddy current testings, dimensional and visual inspections and assembly test. Ultrasonic and eddy current testings are applied to graphite logs to detect an internal flaw and to graphite components to detect a surface flaw, respectively. The assembly test is performed at the works, prior to their installation in the reactor pressure vessel, to examine fabricating precision of each component and alignment of piled-up structures. The graphite components of the HTTR had been tested on the basis of the acceptance standard. It was confirmed that the graphite manufacturing process was well controlled and high quality graphite components were provided to the HTTR. All graphite components except for the fuel graphite blocks are to be installed in the reactor pressure vessel of the HTTR in September 1995. The paper describes the construction status of the HTTR focusing on the graphite components. The acceptance test results are also presented in this paper. (author). Figs

  14. Factorial structure of aerobics athletes’ fitness

    Directory of Open Access Journals (Sweden)

    T.V. Shepelenko

    2017-11-01

    Full Text Available The purpose of the research is to develop an algorithm of teams’ formation in sport aerobics and to define factorial structure of athletes’ fitness. Material : in the research sport aerobics’ athletes (n=19 participated. All athletes are members of Kharkiv national team (Ukraine. All athletes underwent complete medical examination. The functional condition of an organism (arterial blood pressure, indicators of a variability of the rhythm of the heart, treadbahn testing, psycho-physiological state (time’s determination of simple and complex reaction were defined. The physical development and physical fitness and stability of vestibular system were also defined. The factorial and cluster analysis were used. Results : The algorithm of teams’ formation in sport aerobics is developed for performances in various competitive categories. The algorithm contains all stages of standard procedure of the factorial and cluster analysis. In the factorial analysis the individual factorial values were also defined. Conclusions : The obtained data are recommended to be used at teams’ formation for performances in various competitive categories: team formation for pair and group performances. The general and individual factorial structure of athletes’ complex fitness is defined. It is possible to select athletes with similar qualities and with different qualities for the mixed performances. The determination of individual factorial structure of fitness permits to estimate objectively variants of athletes’ formation in groups.

  15. On the comparability of acceptance tests for concrete by operation characteristics

    International Nuclear Information System (INIS)

    Rackwitz, R.

    1978-01-01

    The purely statistical aspect of acceptance tests can be estimated by means of operation characteristics, the position and steepness of which determine the probability for acceptance or rejection of offered loads. For negative decisions in concrete checking there will be, as a rule, an after-check in normal quality control. The operation characteristics with after-check valid for DIN 1045, DIN 1084, and DIN 1048 are set up. Complete comparability of different acceptance tests by means of the operation characteristic can only be achieved if the different sampling rates and the number of decisions are also included in the consideration. Proposals for improving the acceptance tests for concrete are presented. (orig.) [de

  16. Acceptance Test Report for the 241-AZ-101 Ultrasonic Interface Level Analyzer

    Energy Technology Data Exchange (ETDEWEB)

    ANDREWS, J.E.

    2000-01-27

    This document comprises the Acceptance Test Report for the 241-AZ-101 Ultrasonic Interface Level Analyzer. This document presents the results of Acceptance Testing of the 241-AZ-101 Ultrasonic Interface Level Analyzers (URSILLAs). Testing of the URSILLAs was performed in accordance with ATP-260-001, ''URSILLA Pre-installation Acceptance Test Procedure''. The objective of the testing was to verify that all equipment and components function in accordance with design specifications and original equipment manufacturer's specifications.

  17. Acceptance test report for the Westinghouse 100 ton hydraulic trailer

    Energy Technology Data Exchange (ETDEWEB)

    Barrett, R.A.

    1995-03-06

    The SY-101 Equipment Removal System 100 Ton Hydraulic Trailer was designed and built by KAMP Systems, Inc. Performance of the Acceptance Test Procedure at KAMP`s facility in Ontario, California (termed Phase 1 in this report) was interrupted by discrepancies noted with the main hydraulic cylinder. The main cylinder was removed and sent to REMCO for repair while the trailer was sent to Lampson`s facility in Pasco, Washington. The Acceptance Test Procedure was modified and performance resumed at Lampson (termed Phase 2 in this report) after receipt of the repaired cylinder. At the successful conclusion of Phase 2 testing the trailer was accepted as meeting all the performance criteria specified.

  18. Gas characterization system software acceptance test report

    International Nuclear Information System (INIS)

    Vo, C.V.

    1996-01-01

    This document details the results of software acceptance testing of gas characterization systems. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases

  19. Design Learning of Teaching Factory in Mechanical Engineering

    Science.gov (United States)

    Putra, R. C.; Kusumah, I. H.; Komaro, M.; Rahayu, Y.; Asfiyanur, E. P.

    2018-02-01

    The industrial world that is the target of the process and learning outcomes of vocational high school (SMK) has its own character and nuance. Therefore, vocational education institutions in the learning process should be able to make the appropriate learning approach and in accordance with the industrial world. One approach to learning that is based on production and learning in the world of work is by industry-based learning or known as Teaching Factory, where in this model apply learning that involves direct students in goods or service activities are expected to have the quality so it is worth selling and accepted by consumers. The method used is descriptive approach. The purpose of this research is to get the design of the teaching factory based on the competency requirements of the graduates of the spouse industry, especially in the engineering department. The results of this study is expected to be one of the choice of model factory teaching in the field of machinery engineering in accordance with the products and competencies of the graduates that the industry needs.

  20. Particle factories

    International Nuclear Information System (INIS)

    Schindler, Rafe

    1989-01-01

    Physicists' attention is increasingly turning to the high luminosity frontier - providing enough collisions to amass sizable numbers of rare events - to complement the traditional quest for higher energies. This month we cover three areas where projects are now being considered: Phi-factory workshop, PSI Planning for B meson factory, Tau-charm factory

  1. Particle factories

    Energy Technology Data Exchange (ETDEWEB)

    Schindler, Rafe

    1989-07-15

    Physicists' attention is increasingly turning to the high luminosity frontier - providing enough collisions to amass sizable numbers of rare events - to complement the traditional quest for higher energies. This month we cover three areas where projects are now being considered: Phi-factory workshop, PSI Planning for B meson factory, Tau-charm factory.

  2. Fractional factorial plans

    CERN Document Server

    Dey, Aloke

    2009-01-01

    A one-stop reference to fractional factorials and related orthogonal arrays.Presenting one of the most dynamic areas of statistical research, this book offers a systematic, rigorous, and up-to-date treatment of fractional factorial designs and related combinatorial mathematics. Leading statisticians Aloke Dey and Rahul Mukerjee consolidate vast amounts of material from the professional literature--expertly weaving fractional replication, orthogonal arrays, and optimality aspects. They develop the basic theory of fractional factorials using the calculus of factorial arrangements, thereby providing a unified approach to the study of fractional factorial plans. An indispensable guide for statisticians in research and industry as well as for graduate students, Fractional Factorial Plans features: * Construction procedures of symmetric and asymmetric orthogonal arrays. * Many up-to-date research results on nonexistence. * A chapter on optimal fractional factorials not based on orthogonal arrays. * Trend-free plans...

  3. The Northern regional programme for the acceptance testing of X-ray equipment

    International Nuclear Information System (INIS)

    Faulkner, K.; Harrison, R.M.; Kotre, C.J.; Smith, S.; Davies, M.; Barker, P.

    1989-01-01

    Since 1984 the UK Northern Regional Medical Physics Department has participated in a regional acceptance testing programme for all X-ray equipment from mobile units to computed tomography scanners. Organizational and radiation physics aspects of the programme are described. Three levels of tests are performed by physicists: the first on installation, the second after 3 months, the final visit just prior to the end of the manufacturers warranty. The second test is only performed if any aspect of performance requires rechecking as a result of the first. Acceptance test protocols are based on those published by the Institute of Physical Sciences in Medicine. Details limiting values for the acceptance test measurements are given. In some instances testing has resulted in modifications to the design and construction of X-ray equipment. Acceptance testing is important in determining a baseline standard of performance against which routine quality assurance may be assessed. (author)

  4. Understanding patient acceptance and refusal of HIV testing in the emergency department

    Directory of Open Access Journals (Sweden)

    Christopoulos Katerina A

    2012-01-01

    Full Text Available ABSTRACT Background Despite high rates of patient satisfaction with emergency department (ED HIV testing, acceptance varies widely. It is thought that patients who decline may be at higher risk for HIV infection, thus we sought to better understand patient acceptance and refusal of ED HIV testing. Methods In-depth interviews with fifty ED patients (28 accepters and 22 decliners of HIV testing in three ED HIV testing programs that serve vulnerable urban populations in northern California. Results Many factors influenced the decision to accept ED HIV testing, including curiosity, reassurance of negative status, convenience, and opportunity. Similarly, a number of factors influenced the decision to decline HIV testing, including having been tested recently, the perception of being at low risk for HIV infection due to monogamy, abstinence or condom use, and wanting to focus on the medical reason for the ED visit. Both accepters and decliners viewed ED HIV testing favorably and nearly all participants felt comfortable with the testing experience, including the absence of counseling. While many participants who declined an ED HIV test had logical reasons, some participants also made clear that they would prefer not to know their HIV status rather than face psychosocial consequences such as loss of trust in a relationship or disclosure of status in hospital or public health records. Conclusions Testing for HIV in the ED as for any other health problem reduces barriers to testing for some but not all patients. Patients who decline ED HIV testing may have rational reasons, but there are some patients who avoid HIV testing because of psychosocial ramifications. While ED HIV testing is generally acceptable, more targeted approaches to testing are necessary for this subgroup.

  5. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid ''P''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix

  6. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid Q

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix

  7. Automatically generated acceptance test: A software reliability experiment

    Science.gov (United States)

    Protzel, Peter W.

    1988-01-01

    This study presents results of a software reliability experiment investigating the feasibility of a new error detection method. The method can be used as an acceptance test and is solely based on empirical data about the behavior of internal states of a program. The experimental design uses the existing environment of a multi-version experiment previously conducted at the NASA Langley Research Center, in which the launch interceptor problem is used as a model. This allows the controlled experimental investigation of versions with well-known single and multiple faults, and the availability of an oracle permits the determination of the error detection performance of the test. Fault interaction phenomena are observed that have an amplifying effect on the number of error occurrences. Preliminary results indicate that all faults examined so far are detected by the acceptance test. This shows promise for further investigations, and for the employment of this test method on other applications.

  8. The Northern Regional Programme for the acceptance testing of X-ray equipment

    International Nuclear Information System (INIS)

    Faulkner, K.; Harrison, R.M.; Kotre, C.J.; Smith, S.; Davies, M.; Barker, P.

    1989-01-01

    Since 1984 the Regional Medical Physics Department has participated in a regional acceptance testing programme for all X-ray equipment from mobile units to computed tomography scanners. The organizational and radiation physics aspects of the programme are described. Three levels of tests are performed by physicists: the first on installation, the second after 3 months, and the final visit just prior to the end of the manufacturer's warranty. The second test is only performed if any aspect of performance requires rechecking as a result of the first visit. Acceptance test protocols are based on those published by the Institute of Physical Sciences in Medicine. Details of the limiting values for the acceptance test measurements are given. The results of the programme are discussed. In some instances the testing has resulted in modifications to the design and construction of X-ray equipment. Acceptance testing is important in determining a baseline standard of performance against which routine quality assurance may be assessed. (author)

  9. Confirmatory factorial analysis of TEOSQp / Análise factorial confirmatória do TEOSQp

    Directory of Open Access Journals (Sweden)

    Helder M. Fernandes

    2010-01-01

    Full Text Available The present research assessed the reliability, factorial validity and measurement invariance (by gender of the Portuguese version of TEOSQ –Task and Ego Orientation in Sport Questionnaire (Fonseca & Biddle, 2001. Data were collected from 1010 physical education students with a mean age of 15.42 ( SD=1.91. Factorial and invariance measurements were tested via confirmatory factorial analysis. Results supported internal consistency for the two proposed subscales (task and ego. Based on modification indices and theoretical justification the TEOSQ p was reduced to 12 items with better goodness-of-fit indices for the oblique model. The results of gender invariance did not provide full empirical support to the multi-group equivalence assumption, being suggested that TEOSQ p does not measure in the same way goal orientations for boys (orthogonal model and girls (oblique model. In light of these results, conceptual, empirical and practical issues were discussed.

  10. Factorial correlators: angular scaling within QCD jets

    International Nuclear Information System (INIS)

    Peschanski, R.

    2001-01-01

    Factorial correlators measure the amount of dynamical correlation in the multiplicity between two separated phase-space windows. We present the analytical derivation of factorial correlators for a QCD jet described at the double logarithmic (DL) accuracy. We obtain a new angular scaling property for properly normalized correlators between two solid-angle cells or two rings around the jet axis. Normalized QCD factorial correlators scale with the angular distance and are independent of the window size. Scaling violations are expected beyond the DL approximation, in particular from the subject structure. Experimental tests are feasible, and thus would be welcome. (orig.)

  11. W-026, acceptance test report manipulator system

    International Nuclear Information System (INIS)

    Watson, T.L.

    1997-01-01

    The purpose of the WRAP Manipulator System Acceptance Test Plan (ATP) is to verify that the 4 glovebox sets of WRAP manipulator components, including rail/carriage, slave arm, master controller and auxiliary equipment, meets the requirements of the functional segments of 14590 specification. The demonstration of performance elements of the ATP are performed as a part of the Assembly specifications. Manipulator integration is integrated in the performance testing of the gloveboxes. Each requirement of the Assembly specification will be carried out in conjunction with glovebox performance tests

  12. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid N

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5489. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''N''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document

  13. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid M

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5073. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''M''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document

  14. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid L

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5055. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''L''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document

  15. Analysis of scaled-factorial-moment data

    International Nuclear Information System (INIS)

    Seibert, D.

    1990-01-01

    We discuss the two standard constructions used in the search for intermittency, the exclusive and inclusive scaled factorial moments. We propose the use of a new scaled factorial moment that reduces to the exclusive moment in the appropriate limit and is free of undesirable multiplicity correlations that are contained in the inclusive moment. We show that there are some similarities among most of the models that have been proposed to explain factorial-moment data, and that these similarities can be used to increase the efficiency of testing these models. We begin by calculating factorial moments from a simple independent-cluster model that assumes only approximate boost invariance of the cluster rapidity distribution and an approximate relation among the moments of the cluster multiplicity distribution. We find two scaling laws that are essentially model independent. The first scaling law relates the moments to each other with a simple formula, indicating that the different factorial moments are not independent. The second scaling law relates samples with different rapidity densities. We find evidence for much larger clusters in heavy-ion data than in light-ion data, indicating possible spatial intermittency in the heavy-ion events

  16. Acceptance Test Report for the 241-AN-107 Enraf Advanced Technology Gauges

    International Nuclear Information System (INIS)

    Dowell, J.L.; Enderlin, V.R.

    1995-06-01

    This Acceptance Test Report covers the results of the execution of the Acceptance Test Procedure for the 241-AN-107 Enraf Advanced Technology Gauges. The test verified the proper operation of the gauges to measure waste density and level in the 241-AN-107 tank

  17. Acceptance Test Plan for Fourth-Generation Corrosion Monitoring Cabinet

    International Nuclear Information System (INIS)

    NORMAN, E.C.

    2000-01-01

    This Acceptance Test Plan (ATP) will document the satisfactory operation of the third-generation corrosion monitoring cabinet (Hiline Engineering Part No.0004-CHM-072-C01). This ATP will be performed by the manufacturer of the cabinet prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion monitoring cabinet. The test will consist of a continuity test of the cabinet wiring from the end of cable to be connected to corrosion probe, through the appropriate intrinsic safety barriers and out to the 15 pin D-shell connectors to be connected to the corrosion monitoring instrument. Additional testing will be performed using a constant current and voltage source provided by the corrosion monitoring hardware manufacturer to verify proper operation of corrosion monitoring instrumentation

  18. Residues leaching from 'Factory of barren ores'

    International Nuclear Information System (INIS)

    Rakhmatov, N.; Khakimov, N.; Nazarov, Kh.M.; Barotov, A.M.

    2012-01-01

    The objective of the present work is safe management of residues from Factory of Barren Ores, their reprocessing, expenditures reduction for remediation of Istiklol city former uranium tailings. For this purpose, some experiences were adopted - Factory of Barren Ores tailing use for filling up the open pit where water with uranium content 3-5 mg/l is located. Factory of Barren Ores waste are passed through heap leaching and have some amount of uranium salts dissolved in water. Thus, we propose to dissolve uranium from Factory of Barren Ores wastes with uranium bearing water flowing out from gallery and filling up the open-pit by radioactive wastes. In so doing, uranium content flowing out from gallery will increase twice, and further, passing them through apricot's shell, as a sorbent, we will clean the water against radionuclides. Residue samples with uranium content 0,015% from Factory of Barren Ores and uranium bearing waters from gallery 1 with uranium content 0,0025 g/l were used for laboratory tests. After which, a slurry was prepared by means of residue mixing with water in ratio of solid and liquid phases (S:L) - 1:2 and 9,7 ml of sulfuric acid (Ρ=1,82) was added which corresponds consumption by H 2 SO 4 176,54 kg/t. For the first test, leaching was carried out during 4 hours at ph=1,6 at room temperature. For the second test, leaching was carried out at 60 d eg C a nd ph=1,6 during 4 hours. Slurry heating and mixing was carried out by means of magnetic mixer. The basic residue leaching indicators are provided in this article.

  19. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid L

    Energy Technology Data Exchange (ETDEWEB)

    KOCH, M.R.

    1999-11-09

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5055. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''L''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  20. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid M

    Energy Technology Data Exchange (ETDEWEB)

    KOCH, M.R.

    1999-12-13

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5073. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''M''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  1. Thermocouple module halt acceptance test report for tank 241-SY-101 DACS-1

    International Nuclear Information System (INIS)

    Larsen, D.C.

    1998-01-01

    Testing was started on February 24, 1998 and completed on February 25, 1998. The completed procedure consists of 4 acceptance test sections, 6.1 through 6.4. Three test exceptions were identified during the procedure. The first test exception was determined to be unrelated to the ATP and unfortunate that the instrument failed during the ATP. The next two test exceptions were disposition as acceptable because the alarming functions worked correctly in identifying a problem when software communications were interrupted. The test was completed satisfactorily over 2 days. The remainder of the acceptance test report is the completed test procedure

  2. AutoPyFactory: A Scalable Flexible Pilot Factory Implementation

    International Nuclear Information System (INIS)

    Caballero, J; Hover, J; Love, P; Stewart, G A

    2012-01-01

    The ATLAS experiment at the CERN LHC is one of the largest users of grid computing infrastructure, which is a central part of the experiment's computing operations. Considerable efforts have been made to use grid technology in the most efficient and effective way, including the use of a pilot job based workload management framework. In this model the experiment submits ‘pilot’ jobs to sites without payload. When these jobs begin to run they contact a central service to pick-up a real payload to execute. The first generation of pilot factories were usually specific to a single Virtual Organization (VO), and were bound to the particular architecture of that VO's distributed processing. A second generation provides factories which are more flexible, not tied to any particular VO, and provide new and improved features such as monitoring, logging, profiling, etc. In this paper we describe this key part of the ATLAS pilot architecture, a second generation pilot factory, AutoPyFactory. AutoPyFactory has a modular design and is highly configurable. It is able to send different types of pilots to sites and exploit different submission mechanisms and queue characteristics. It is tightly integrated with the PanDA job submission framework, coupling pilot flow to the amount of work the site has to run. It gathers information from many sources in order to correctly configure itself for a site and its decision logic can easily be updated. Integrated into AutoPyFactory is a flexible system for delivering both generic and specific job wrappers which can perform many useful actions before starting to run end-user scientific applications, e.g., validation of the middleware, node profiling and diagnostics, and monitoring. AutoPyFactory also has a robust monitoring system that has been invaluable in establishing a reliable pilot factory service for ATLAS.

  3. Acceptability of self-collected vaginal samples for HPV testing in an ...

    African Journals Online (AJOL)

    Objective: To evaluate the acceptability of self-collected vaginal samples for HPV testing in women living in rural and urban areas of ... Conclusion: Acceptability of self-sampling for HPV testing was similarly excellent in both groups despite their difference in terms ... cancer is the leading cause of death caused by cancer in.

  4. Hazelnut factory workers in working in the evaluation of the frequency of obesity and healthy life habits

    OpenAIRE

    ilknur Aydin Avci; Tugba Kavalali Erdogan

    2015-01-01

    Aim:In this study, hazelnuts healthy lifestyle habits of workers in the factories and to evaluate the obesity situation is made in accordance with the principles of descriptive study. Method:This research was carried out between 01.06.2014-13.06.2014 nuts in a factory in Ordu. The scope of research targeted to participate in all but 19 of the 139 workers in this factory workers did not accept the research and the research was conducted with 120 people due to lack of work (86.33% of the popula...

  5. Determination of the pollution with lead in the batteries factory in Al-Saffera (Aleppo) and surrounding area

    International Nuclear Information System (INIS)

    Al-Oudat, M.; Al-Kharfan, K.; Al-Shamali, K.

    2007-10-01

    The study aimed to determine the lead concentrations in the ecosystem surrounding the batteries factory in Al-Saffera. The results showed that the lead levels were very high in both factory area and the surrounding agricultural area. Lead levels in air varied between 12 and 34 μg/m3 in the area outside the factory. The same trends were in both soil and plant samples, and normal washing does not decrease the lead level in plant samples to acceptable levels. Mean lead levels in blood was also high and ranged between 55 and 28 μg /dl for factory workers and village inhabitants respectively. In conclusion the authorities administration must take all necessary procedures to reduce the lead levels in the factory area and in the surrounding area.(Author)

  6. Determination of the pollution with lead in the batteries factory in Al-Saffera (Aleppo) and surrounding area

    Energy Technology Data Exchange (ETDEWEB)

    Al-Oudat, M; Al-Kharfan, K; Al-Shamali, K [Atomic Energy Commission, Damascus (Syrian Arab Republic), Dept. of Protection and Safety

    2007-10-15

    The study aimed to determine the lead concentrations in the ecosystem surrounding the batteries factory in Al-Saffera. The results showed that the lead levels were very high in both factory area and the surrounding agricultural area. Lead levels in air varied between 12 and 34 {mu}g/m3 in the area outside the factory. The same trends were in both soil and plant samples, and normal washing does not decrease the lead level in plant samples to acceptable levels. Mean lead levels in blood was also high and ranged between 55 and 28 {mu}g /dl for factory workers and village inhabitants respectively. In conclusion the authorities administration must take all necessary procedures to reduce the lead levels in the factory area and in the surrounding area.(Author)

  7. Lighting up yeast cell factories by transcription factor-based biosensors

    DEFF Research Database (Denmark)

    D'ambrosio, Vasil; Jensen, Michael Krogh

    2017-01-01

    Our ability to rewire cellular metabolism for the sustainable production of chemicals, fuels and therapeutics based on microbial cell factories has advanced rapidly during the last two decades. Especially the speed and precision by which microbial genomes can be engineered now allow for more...... process. For this purpose, there is a need to develop new techniques for screening and selection of best-performing cell factory designs in multiplex. Here we review the current status of the sourcing, design and engineering of biosensors derived from allosterically regulated transcription factors applied...... advanced designs to be implemented and tested. However, compared to the methods developed for engineering cell factories, the methods developed for testing the performance of newly engineered cell factories in high throughput are lagging far behind, which consequently impacts the overall biomanufacturing...

  8. AutoPyFactory: A Scalable Flexible Pilot Factory Implementation

    CERN Document Server

    Caballero, J; The ATLAS collaboration; Love, P; Stewart, G

    2012-01-01

    The ATLAS experiment at the CERN LHC is one of the largest users of grid computing infrastructure, which is a central part of the experiment’s computing operations. Considerable efforts have been made to use grid technology in the most efficient and effective way, including the use of a pilot job based workload management framework. In this model the experiment submits ’pilot’ jobs to sites without payload. When these jobs begin to run they contact a central service to retrieve a real payload to execute. The first generation of pilot factories were usually specific to a single VO, and were bound to the particular architecture of that VO’s distributed processing. A second generation provides factories which are more flexible, not tied to any particular VO, and provide new or improved features such as monitoring, logging, profiling, etc. In this paper we describe this key part of the ATLAS pilot architecture, a second generation pilot factory, AutoPyFactory. AutoPyFactory has a modular design and is hig...

  9. Application of fractional factorial design to improve hot smoked Nile Perch (Lates niloticus quality

    Directory of Open Access Journals (Sweden)

    Sokamté, T.A.

    2017-06-01

    Full Text Available The aim of this research was to study the parameters influencing moisture, salt and total phenol content of hot smoked Nile Perch and to compare the influence of processing conditions on its proximate composition and sensory quality. The effect on moisture, salt and total phenol content was investigated using fractional factorial design with seven factors and two levels: X1 for brine concentration, X2 for brining time, X3 for preliminary smoking-drying time, X4 for smoking time, X5 for hot smoking time, X6 for smoking temperature and X7 for hot smoking temperature. A Multiple Linear Regression Analysis was performed to fit the mathematical model to the collected data and the model tested using analysis of variance (ANOVA. Results of ANOVA indicated the good accuracy and highest significance of the mathematical model. The range of total protein and lipid content was 17.96 to 34.34% and 0.87 to 4.43%, respectively. The range of general acceptability of smoked Nile Perch was 4.6 to 8.2 based on 9-point hedonic scale. Based on the results obtained, including the overall acceptability, proximate composition and smoking criteria of finished product, samples produced with the following conditions: brining at 4% for 270min, drying at 30°C for 30min and the smoked time/temperature cycles following: 30°C/120min; 50°C/240min and 80°C/240min was the best and most accepted. The results derived from this study indicate that the fractional factorial design is a useful screening tool for improving industrial smoking process of Nile Perch.

  10. Planning and acceptance testing of MV therapy installations

    International Nuclear Information System (INIS)

    Almond, Peter R.; Horton, John L.

    1995-01-01

    Purpose: This course is designed for practitioners and beginners in brachytherapy. The aim is to review biological principles equipment are aware of all aspects involved. The object is to cover in a broad overview the considerations that go into selecting, installing, testing and accepting megavoltage therapy equipment and to provide a resource for more detailed information. Planning and acceptance testing of a megavoltage therapy installation is a major undertaking for any size group, institution or department. It can take approximately two years from the time a decision is made to get a machine to where the first patient is treated. Because the equipment and site preparation are expensive, and most of the machines are complex and can be supplied by several different manufacturers, it is imperative that a great deal of thought and care go into the decision: the aim being that the specifications of the machine that is installed meet the immediate need of the department and the needs for the projected lifetime of the equipment. A general survey of the types of equipment available will be presented. This will concentrate on general purpose linear accelerators, although Cobalt 60 machines, microtrons and special purpose machines (intra-operative equipment) will also be covered. General descriptions of the machines along with typical specifications will be given. Selecting the best machine to meet specific needs can be quite complex and criteria for making the selection are presented in a series of twelve steps. site selection and room design, including the console area, are also critical. The general principles for shielding calculations will be provided. Critical to any installation is the acceptance testing of the equipment including material and radiation oncology performance tests. These tests will be outlined. A reading list of suitable references describing in detail many of the aspects of this course will be provided

  11. Sharing Data between Mobile Devices, Connected Vehicles and Infrastructure Task 6: Prototype Acceptance Test Summary Report

    Science.gov (United States)

    2017-10-30

    The Task 6 Prototype Acceptance Test Summary Report summarizes the results of Acceptance Testing carried out at Battelle facilities in accordance with the Task 6 Acceptance Test Plan. The Acceptance Tests were designed to verify that the prototype sy...

  12. Factory physics

    CERN Document Server

    Hopp, Wallace J.

    2011-01-01

    After a brief introductory chapter, "Factory Physics 3/e" is divided into three parts: I - The Lessons of History; II - Factory Physics; and III - Principles in Practice. The scientific approach to manufacturing and supply chain management, developed in Part II, is unique to this text. No other text or professional book provides a rigorous, principles-based foundation for manufacturing management. The Third Edition offers tighter connections between Lean Manufacturing, MRP/ERP, Six Sigma, Supply Chain Management, and Factory Physics. In addition to enhancing the historical overview of how these systems evolved, the authors show explicitly how users can achieve Lean Manufacturing objectives (faster response, less inventory) using the integration aspects of MRP/ERP/SCM systems along with the variance analysis methods of Six Sigma. Factory Physics provides the overarching framework that coordinates all of these initiatives into a single-focused strategy.

  13. Design and Factory Test of the E /E- Frascati Linear Accelerator for DAFNE

    Energy Technology Data Exchange (ETDEWEB)

    Anamkath, H.; Lyons, S.; Nett, D.; Treas, P.; Whitham, K.; Zante, T.; /Titan Beta, Dublin; Miller, R.; /Titan Beta, Dublin /SLAC; Boni, R.; Hsieh, H.; Sannibale, F.; Vescovi, M.; Vignola, G.; /Frascati

    2011-11-28

    The electron-positron accelerator for the DAFNE project has been built and is in test at Titan Beta in Dublin, CA. This S-Band RF linac system utilizes four 45 MW sledded klystrons and 16-3 m accelerating structures to achieve the required performance. It delivers a 4 ampere electron beam to the positron converter and accelerates the resulting positrons to 550 MeV. The converter design uses a 4.3T pulsed tapered flux compressor along with a pseudo-adiabatic tapered field to a 5 KG solenoid over the first two positron accelerating sections. Quadrupole focusing is used after 100 MeV. The system performance is given in Table 1. This paper briefly describes the design and development of the various subassemblies in this system and gives the initial factory test data.

  14. Numerical study of a magnetically insulated front-end channel for a neutrino factory

    Directory of Open Access Journals (Sweden)

    Diktys Stratakis

    2011-01-01

    Full Text Available A neutrino factory, which can deliver an intense flux of ∼10^{21} neutrinos per year from a multi-GeV stored muon beam, is seemingly the ideal tool for studying neutrino oscillations and CP violations for leptons. The front end of this facility plays a critical role in determining the number of muons that can be accepted by the downstream accelerators. Delivering peak performance requires transporting the muon beams through long sections of a beam channel containing high-gradient rf cavities and strong focusing solenoids. Here, we propose a novel scheme to improve the performance of the cavities, thereby increasing the number of muons within the acceptance of the accelerator chain. The key element of our new scheme is to apply a tangential magnetic field to the rf surfaces, thus forcing any field-emitted electrons to return to the surface before gaining enough energy to damage the cavity. We incorporate this idea into a new lattice design for a neutrino factory, and detail its performance numerically. Although our proposed front-end channel requires more rf power than conventional pillbox designs, it provides enough beam cooling and muon production to be a feasible option for a neutrino factory.

  15. Acceptance test report for portable exhauster POR-007/Skid E

    International Nuclear Information System (INIS)

    Kriskovich, J.R.

    1998-01-01

    This document describes Acceptance Testing performed on Portable Exhauster POR-007/Skid E. It includes measurements of bearing vibration levels, pressure decay testing, programmable logic controller interlocks, high vacuum, flow and pressure control functional testing. The purpose of Acceptance testing documented by this report was to demonstrate compliance of the exhausters with the performance criteria established within HNF-0490, Rev. 1 following a repair and upgrade effort at Hanford. In addition, data obtained during this testing is required for the resolution of outstanding Non-conformance Reports (NCR), and finally, to demonstrate the functionality of the associated software for the pressure control and high vacuum exhauster operating modes provided for by W-320. Additional testing not required by the ATP was also performed to assist in the disposition and close out of receiving inspection report and for application design information (system curve). Results of this testing are also captured within this document

  16. Testing strong factorial invariance using three-level structural equation modeling

    NARCIS (Netherlands)

    Jak, Suzanne

    Within structural equation modeling, the most prevalent model to investigate measurement bias is the multigroup model. Equal factor loadings and intercepts across groups in a multigroup model represent strong factorial invariance (absence of measurement bias) across groups. Although this approach is

  17. Neutron absorber qualification and acceptance testing from the designer's perspective

    Energy Technology Data Exchange (ETDEWEB)

    Bracey, W. [Transnuclear, Inc, Hawthorne, NY (United States); Chiocca, R. [Cogema Logistics, St. Quentin en Yvelines (France)

    2004-07-01

    Starting in the mid 1990's, the USNRC began to require less than 100% credit for the 10B present in fixed neutron absorbers spent fuel transport packages. The current practice in the US is to use only 75% of the specified 10B in criticality safety calculations unless extensive acceptance testing demonstrates both the presence of the 10B and uniformity of its distribution. In practice, the NRC has accepted no more than 90% credit for 10B in recent years, while other national competent authorities continue to accept 100%. More recently, with the introduction of new neutron absorber materials, particularly aluminum / boron carbide metal matrix composites, the NRC has also expressed expectations for qualification testing, based in large part on Transnuclear's successful application to use a new composite material in the TN-68 storage / transport cask. The difficulty is that adding more boron than is really necessary to a metal has some negative effects on the material, reducing the ductility and the thermal conductivity, and increasing the cost. Excessive testing requirements can have the undesired effect of keeping superior materials out of spent fuel package designs, without a corresponding justification based on public safety. In European countries and especially in France, 100% credit has been accepted up to now with materials controls specified in the Safety Analysis Report (SAR): Manufacturing process approved by qualification testing Materials manufacturing controlled under a Quality Assurance system. During fabrication, acceptance testing directly on products or on representative samples. Acceptance criteria taking into account a statistical uncertainty corresponding to 3{sigma}. The original and current bases for the reduced {sup 10}B credit, the design requirements for neutron absorber materials, and the experience of Transnuclear and Cogema Logistics with neutron absorber testing are examined. Guidelines for qualification and acceptance testing and

  18. MCO Engineering Test Report Fuel Basket Handling Grapple Acceptance Test

    International Nuclear Information System (INIS)

    CHENAULT, D.M.

    2000-01-01

    Acceptance testing of the production SNF Fuel Basket lift grapples to the required 150 percent maximum lift load is documented herein. The report shows the results affirming the proof test passage. The primary objective of this test was to confirm the load rating of the grapple per applicable requirements of ANSI 14 6 American National Standard For Radioactive Materials Special Lifting Devices for Shipping Containers Weighing 10,000 pounds (4500kg) or More. The above Standard requires a load test of 150% of the design load which must be held for a minimum of 10 minutes followed by a Liquid Penetrant or Magnetic Particle examination of critical areas and welds in accordance with the ANSI/ASME Boiler and Pressure Vessel Code 1989 Section 111 Division 1 section NF 5350

  19. Nevada Test Site Waste Acceptance Criteria (NTSWAC), Rev. 7-01

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2009-05-01

    This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, Nevada Test Site Waste Acceptance Criteria (NTSWAC). The NTSWAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive waste and mixed low-level waste for disposal. The NTSWAC includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex for disposal.

  20. Nevada Test Site Waste Acceptance Criteria (NTSWAC), Rev. 7-01

    International Nuclear Information System (INIS)

    2009-01-01

    This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, Nevada Test Site Waste Acceptance Criteria (NTSWAC). The NTSWAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive waste and mixed low-level waste for disposal. The NTSWAC includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex for disposal.

  1. An examination of the factorial and convergent validity of four measures of conspiracist ideation, with recommendations for researchers.

    Directory of Open Access Journals (Sweden)

    Viren Swami

    Full Text Available A number scales have been developed to measure conspiracist ideation, but little attention has been paid to the factorial validity of these scales. We reassessed the psychometric properties of four widely-used scales, namely the Belief in Conspiracy Theories Inventory (BCTI, the Conspiracy Mentality Questionnaire (CMQ, the Generic Conspiracist Beliefs Scale (GCBS, and the One-Item Conspiracy Measure (OICM. Eight-hundred-and-three U.S. adults completed all measures, along with measures of endorsement of 9/11 and anti-vaccination conspiracy theories. Through both exploratory and confirmatory factor analysis, we found that only the BCTI had acceptable factorial validity. We failed to confirm the factor structures of the CMQ and the GBCS, suggesting these measures had poor factorial validity. Indices of convergent validity were acceptable for the BCTI, but weaker for the other measures. Based on these findings, we provide suggestions for the future refinement in the measurement of conspiracist ideation.

  2. Standard-B auto grab sampler hydrogen monitoring system, Acceptance Test Report

    International Nuclear Information System (INIS)

    Lott, D.T.

    1995-01-01

    Project W-369, Watch List Tank Hydrogen Monitors, installed a Standard-C Hydrogen Monitoring System (SHMS) on the Flammable gas waste tank AN-104. General Support Projects (8K510) was support by Test Engineering (7CH30) in the performance of the Acceptance Test Procedures (ATP) to qualify the SHMS cabinets on the waste tank. The ATP's performance was controlled by Tank Farm work package. This completed ATP is transmitted by EDT-601748 as an Acceptance Test Report (ATR) in accordance with WHC-6-1, EP 4.2 and EP 1.12

  3. Acceptance test report, plutonium finishing plant life safety upgrade

    International Nuclear Information System (INIS)

    Hodge, S.G.

    1994-01-01

    This acceptance Test Procedure (ATP) has been prepared to demonstrate that modifications to the Fir Protection systems function as required by project criteria. The ATP will test the Fire Alarm Control Panels, Flow Alarm Pressure Switch, Heat Detectors, Smoke Detectors, Flow Switches, Manual Pull Stations, and Gong/Door By Pass Switches

  4. Acceptance Test Report for Fourth-Generation Hanford Corrosion Monitoring Cabinet

    International Nuclear Information System (INIS)

    NORMAN, E.C.

    2000-01-01

    This Acceptance Test Plan (ATP) will document the satisfactory operation of the third-generation corrosion monitoring cabinet (Hiline Engineering Part No.0004-CHM-072-C01). This ATP will be performed by the manufacturer of the cabinet prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion monitoring cabinet. The test will consist of a continuity test of the cabinet wiring from the end of cable to be connected to corrosion probe, through the appropriate intrinsic safety barriers and out to the 15 pin D-shell connectors to be connected to the corrosion monitoring instrument. Additional testing will be performed using a constant current and voltage source provided by the corrosion monitoring hardware manufacturer to verify proper operation of corrosion monitoring instrumentation

  5. Acceptance test report for 241-AW process air system

    International Nuclear Information System (INIS)

    Kostelnik, A.J.

    1994-01-01

    The acceptance test procedure (ATP) for the compressed air system at building 241-AW-273 was completed on March 11, 1993. The system was upgraded to provide a reliable source of compressed air to the tank farm. The upgrade included the demolition of the existing air compressor and associated piping, as well as the installation of a new air compressor with a closed loop cooling system. A compressed air cross-tie was added to allow the process air compressor to function as a back-up to the existing instrument air compressor. The purpose of the ATP was to achieve three primary objectives: verify system upgrade in accordance with the design media; provide functional test of system components and controls; and prepare the system for the Operational Test. The ATP was successfully completed with thirteen exceptions, which were resolved prior to completing the acceptance test. The repaired exceptions had no impact to safety or the environment and are briefly summarized. Testing ensured that the system was installed per design, that its components function as required and that it is ready for operational testing and subsequent turnover to operations

  6. Cell Factory Engineering

    DEFF Research Database (Denmark)

    Davy, Anne Mathilde; Kildegaard, Helene Faustrup; Andersen, Mikael Rørdam

    2017-01-01

    focused on individual strategies or cell types, but collectively they fall under the broad umbrella of a growing field known as cell factory engineering. Here we condense >130 reviews and key studies in the art into a meta-review of cell factory engineering. We identified 33 generic strategies......-review provides general strategy guides for the broad range of applications of rational engineering of cell factories....

  7. Enraf Series 854 advanced technology gauge (ATG) acceptance test procedure

    International Nuclear Information System (INIS)

    Huber, J.H.

    1996-01-01

    This Acceptance Test Procedure was written to test the Enraf Series 854 Advanced Technology Gauge (ATG) prior to installation in the Tank Farms. The procedure sets various parameters and verifies that the gauge is functional

  8. Surface moisture measurement system hardware acceptance test report

    Energy Technology Data Exchange (ETDEWEB)

    Ritter, G.A., Westinghouse Hanford

    1996-05-28

    This document summarizes the results of the hardware acceptance test for the Surface Moisture Measurement System (SMMS). This test verified that the mechanical and electrical features of the SMMS functioned as designed and that the unit is ready for field service. The bulk of hardware testing was performed at the 306E Facility in the 300 Area and the Fuels and Materials Examination Facility in the 400 Area. The SMMS was developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks.

  9. Nevada Test Site waste acceptance criteria [Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    1997-08-01

    Revision one updates the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the NTS. Review each section of this document. This document is not intended to include all of the requirements; rather, it is meant as a guide toward meeting the regulations. All references in this document should be observed to avoid omission of requirements on which acceptance or rejection of waste will be based. The Department of Energy/Nevada Operations Office (DOE/NV) and support contractors are available to assist you in understanding or interpreting this document.

  10. Nevada Test Site waste acceptance criteria [Revision 1

    International Nuclear Information System (INIS)

    None

    1997-01-01

    Revision one updates the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive and mixed waste for disposal; and transuranic and transuranic mixed waste for interim storage at the NTS. Review each section of this document. This document is not intended to include all of the requirements; rather, it is meant as a guide toward meeting the regulations. All references in this document should be observed to avoid omission of requirements on which acceptance or rejection of waste will be based. The Department of Energy/Nevada Operations Office (DOE/NV) and support contractors are available to assist you in understanding or interpreting this document

  11. Local tolerance testing under REACH: Accepted non-animal methods are not on equal footing with animal tests.

    Science.gov (United States)

    Sauer, Ursula G; Hill, Erin H; Curren, Rodger D; Raabe, Hans A; Kolle, Susanne N; Teubner, Wera; Mehling, Annette; Landsiedel, Robert

    2016-07-01

    In general, no single non-animal method can cover the complexity of any given animal test. Therefore, fixed sets of in vitro (and in chemico) methods have been combined into testing strategies for skin and eye irritation and skin sensitisation testing, with pre-defined prediction models for substance classification. Many of these methods have been adopted as OECD test guidelines. Various testing strategies have been successfully validated in extensive in-house and inter-laboratory studies, but they have not yet received formal acceptance for substance classification. Therefore, under the European REACH Regulation, data from testing strategies can, in general, only be used in so-called weight-of-evidence approaches. While animal testing data generated under the specific REACH information requirements are per se sufficient, the sufficiency of weight-of-evidence approaches can be questioned under the REACH system, and further animal testing can be required. This constitutes an imbalance between the regulatory acceptance of data from approved non-animal methods and animal tests that is not justified on scientific grounds. To ensure that testing strategies for local tolerance testing truly serve to replace animal testing for the REACH registration 2018 deadline (when the majority of existing chemicals have to be registered), clarity on their regulatory acceptance as complete replacements is urgently required. 2016 FRAME.

  12. Acceptance sampling for attributes via hypothesis testing and the hypergeometric distribution

    Science.gov (United States)

    Samohyl, Robert Wayne

    2017-10-01

    This paper questions some aspects of attribute acceptance sampling in light of the original concepts of hypothesis testing from Neyman and Pearson (NP). Attribute acceptance sampling in industry, as developed by Dodge and Romig (DR), generally follows the international standards of ISO 2859, and similarly the Brazilian standards NBR 5425 to NBR 5427 and the United States Standards ANSI/ASQC Z1.4. The paper evaluates and extends the area of acceptance sampling in two directions. First, by suggesting the use of the hypergeometric distribution to calculate the parameters of sampling plans avoiding the unnecessary use of approximations such as the binomial or Poisson distributions. We show that, under usual conditions, discrepancies can be large. The conclusion is that the hypergeometric distribution, ubiquitously available in commonly used software, is more appropriate than other distributions for acceptance sampling. Second, and more importantly, we elaborate the theory of acceptance sampling in terms of hypothesis testing rigorously following the original concepts of NP. By offering a common theoretical structure, hypothesis testing from NP can produce a better understanding of applications even beyond the usual areas of industry and commerce such as public health and political polling. With the new procedures, both sample size and sample error can be reduced. What is unclear in traditional acceptance sampling is the necessity of linking the acceptable quality limit (AQL) exclusively to the producer and the lot quality percent defective (LTPD) exclusively to the consumer. In reality, the consumer should also be preoccupied with a value of AQL, as should the producer with LTPD. Furthermore, we can also question why type I error is always uniquely associated with the producer as producer risk, and likewise, the same question arises with consumer risk which is necessarily associated with type II error. The resolution of these questions is new to the literature. The

  13. MUON POLARIZATION EFFECTS IN THE FRONT END OF THE NEUTRINO FACTORY

    International Nuclear Information System (INIS)

    FERNOW, R.C.; GALLARDO, J.C.; FUKUI, Y.

    2000-01-01

    The authors summarize the methods used for simulation of polarization effects in the front end of a possible neutrino factory. They first discuss the helicity of muons in the pion decay process. They find that, neglecting acceptance considerations, the average helicity asymptotically approaches a magnitude of 0.185 at large pion momenta. Next they describe the methods used for tracking the spin through the complicated electromagnetic field configurations in the front end of the neutrino factory, including rf phase rotation and ionization cooling channels. Various depolarizing effects in matter are then considered, including multiple Coulomb scattering and elastic scattering from atomic electrons. Finally, they include all these effects in a simulation of a 480 m long, double phase rotation front end scenario

  14. Intelligent Network Flow Optimization (INFLO) prototype acceptance test summary.

    Science.gov (United States)

    2015-05-01

    This report summarizes the results of System Acceptance Testing for the implementation of the Intelligent Network : Flow Optimization (INFLO) Prototype bundle within the Dynamic Mobility Applications (DMA) portion of the Connected : Vehicle Program. ...

  15. WRAP low level waste restricted waste management (LLW RWM) glovebox acceptance test report

    International Nuclear Information System (INIS)

    Leist, K.J.

    1997-01-01

    On April 22, 1997, the Low Level Waste Restricted Waste Management (LLW RWM) glovebox was tested using acceptance test procedure 13027A-87. Mr. Robert L. Warmenhoven served as test director, Mr. Kendrick Leist acted as test operator and test witness, and Michael Lane provided miscellaneous software support. The primary focus of the glovebox acceptance test was to examine glovebox control system interlocks, operator Interface Unit (OIU) menus, alarms, and messages. Basic drum port and lift table control sequences were demonstrated. OIU menus, messages, and alarm sequences were examined, with few exceptions noted. Barcode testing was bypassed, due to the lack of installed equipment as well as the switch from basic reliance on fixed bar code readers to the enhanced use of portable bar code readers. Bar code testing was completed during performance of the LLW RWM OTP. Mechanical and control deficiencies were documented as Test Exceptions during performance of this Acceptance Test. These items are attached as Appendix A to this report

  16. Tau-charm factory..

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1995-10-15

    In addition to hearing the latest experimental and theoretical developments at the 17th International Symposium on Lepton Photon Interactions in Beijing, delegates were brought up-to-date on the substantial progress towards the realization of a Tau-Charm Factory in the Chinese capital. Opening the Symposium, Zhou Guangzhao, President of the Chinese Academy of Sciences, expressed a commitment of the Chinese government to basic research and its interest in the continuing development high energy physics in China. Following the very successful construction and operation of Beijing's Electron-Positron Collider, BEPC, the Chinese government has provided 5M yuan ($US 600,000) for a feasibility study by the end of 1996 for a Tau-Charm Factory at Beijing's Institute of High Energy Physics (IHEP). Professor Zhou expressed his belief that, once approved, such a factory would greatly enhance high energy physics in China. He warmly welcomed international collaboration both in the construction of the accelerator and in the experimental programme. His comments were reinforced in the following welcome speech by IHEP Director Zheng Zhipeng. Conference delegates had the opportunity to inspect the BEPC injector and collider, built almost entirely by Chinese industry. The International Committee for Future Accelerators (ICFA) met during the Symposium, with Tau- Charm Factory business on the agenda. In his subsequent report, ICFA Chairman John Peoples said that a Tau-Charm Factory provides a unique experimental environment for the precision studies of tau, charm and light quark-gluon spectroscopy, and that some issues in these fields are not satisfactorily addressed solely by B Factories or fixed-target experiments. The committee expressed a strong interest in seeing a Tau-Charm Factory built and noted the serious interest, especially in China, and looks forward to operation and exploitation by the international physics community. In their Beijing summary talks, both Sam Ting and T

  17. Tau-charm factory..

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    In addition to hearing the latest experimental and theoretical developments at the 17th International Symposium on Lepton Photon Interactions in Beijing, delegates were brought up-to-date on the substantial progress towards the realization of a Tau-Charm Factory in the Chinese capital. Opening the Symposium, Zhou Guangzhao, President of the Chinese Academy of Sciences, expressed a commitment of the Chinese government to basic research and its interest in the continuing development high energy physics in China. Following the very successful construction and operation of Beijing's Electron-Positron Collider, BEPC, the Chinese government has provided 5M yuan ($US 600,000) for a feasibility study by the end of 1996 for a Tau-Charm Factory at Beijing's Institute of High Energy Physics (IHEP). Professor Zhou expressed his belief that, once approved, such a factory would greatly enhance high energy physics in China. He warmly welcomed international collaboration both in the construction of the accelerator and in the experimental programme. His comments were reinforced in the following welcome speech by IHEP Director Zheng Zhipeng. Conference delegates had the opportunity to inspect the BEPC injector and collider, built almost entirely by Chinese industry. The International Committee for Future Accelerators (ICFA) met during the Symposium, with Tau- Charm Factory business on the agenda. In his subsequent report, ICFA Chairman John Peoples said that a Tau-Charm Factory provides a unique experimental environment for the precision studies of tau, charm and light quark-gluon spectroscopy, and that some issues in these fields are not satisfactorily addressed solely by B Factories or fixed-target experiments. The committee expressed a strong interest in seeing a Tau-Charm Factory built and noted the serious interest, especially in China, and looks forward to operation and exploitation by the international physics community. In their Beijing summary talks, both Sam Ting

  18. MCO combustible gas management leak test acceptance criteria; TOPICAL

    International Nuclear Information System (INIS)

    SHERRELL, D.L.

    1999-01-01

    Existing leak test acceptance criteria for mechanically sealed and weld sealed multi-canister overpacks (MCO) were evaluated to ensure that MCOs can be handled and stored in stagnant air without compromising the Spent Nuclear Fuel Project's overall strategy to prevent accumulation of combustible gas mixtures within MCO's or within their surroundings. The document concludes that the integrated leak test acceptance criteria for mechanically sealed and weld sealed MCOs (1 x 10(sup -5) std cc/sec and 1 x 10(sup -7) std cc/sec, respectively) are adequate to meet all current and foreseeable needs of the project, including capability to demonstrate compliance with the NFPA 60 Paragraph 3-3 requirement to maintain hydrogen concentrations[within the air atmosphere CSB tubes] t or below 1 vol% (i.e., at or below 25% of the LFL)

  19. Physics opportunities for a B Factory

    International Nuclear Information System (INIS)

    Quinn, H.R.

    1992-02-01

    In the short time allotted for this talk it is not possible to review all the physics opportunities offered by a B Factory. I focus on the physics of CP Violation and the resulting tests of the Standard Model

  20. 242A Distributed Control System Year 2000 Acceptance Test Report

    Energy Technology Data Exchange (ETDEWEB)

    TEATS, M.C.

    1999-08-31

    This report documents acceptance test results for the 242-A Evaporator distributive control system upgrade to D/3 version 9.0-2 for year 2000 compliance. This report documents the test results obtained by acceptance testing as directed by procedure HNF-2695. This verification procedure will document the initial testing and evaluation of the potential 242-A Distributed Control System (DCS) operating difficulties across the year 2000 boundary and the calendar adjustments needed for the leap year. Baseline system performance data will be recorded using current, as-is operating system software. Data will also be collected for operating system software that has been modified to correct year 2000 problems. This verification procedure is intended to be generic such that it may be performed on any D/3{trademark} (GSE Process Solutions, Inc.) distributed control system that runs with the VMSTM (Digital Equipment Corporation) operating system. This test may be run on simulation or production systems depending upon facility status. On production systems, DCS outages will occur nine times throughout performance of the test. These outages are expected to last about 10 minutes each.

  1. 242A Distributed Control System Year 2000 Acceptance Test Report

    International Nuclear Information System (INIS)

    TEATS, M.C.

    1999-01-01

    This report documents acceptance test results for the 242-A Evaporator distributive control system upgrade to D/3 version 9.0-2 for year 2000 compliance. This report documents the test results obtained by acceptance testing as directed by procedure HNF-2695. This verification procedure will document the initial testing and evaluation of the potential 242-A Distributed Control System (DCS) operating difficulties across the year 2000 boundary and the calendar adjustments needed for the leap year. Baseline system performance data will be recorded using current, as-is operating system software. Data will also be collected for operating system software that has been modified to correct year 2000 problems. This verification procedure is intended to be generic such that it may be performed on any D/3(trademark) (GSE Process Solutions, Inc.) distributed control system that runs with the VMSTM (Digital Equipment Corporation) operating system. This test may be run on simulation or production systems depending upon facility status. On production systems, DCS outages will occur nine times throughout performance of the test. These outages are expected to last about 10 minutes each

  2. Acceptance test report for portable exhauster POR-008/Skid F

    International Nuclear Information System (INIS)

    Kriskovich, J.R.

    1998-01-01

    Portable Exhauster POR-008 was procured via HNF-0490, Specification for a Portable Exhausted System for Waste Tank Ventilation. Prior to taking ownership, acceptance testing was performed at the vendors. However at the conclusion of testing a number of issues remained that required resolution before the exhausters could be used by Project W-320. The purpose of acceptance testing documented by this report was to demonstrate compliance of the exhausters with the performance criteria established within HNF-O49O, Rev. 1 following a repair and upgrade effort at Hanford. In addition, data obtained during this testing is required for the resolution of outstanding Non-conformance Reports (NCR), and finally, to demonstrate the functionality of the associated software for the pressure control and high vacuum exhauster operating modes provided for by W-320. Additional testing not required by the ATP was also performed to assist in the disposition and close out of receiving inspection report and for application design information (system curve). Results of this testing are also captured within this document

  3. Análise factorial confirmatória do TEOSQp Confirmatory factorial analysis of TEOSQp

    Directory of Open Access Journals (Sweden)

    Helder M. Fernandes

    2010-04-01

    Full Text Available O propósito do presente estudo foi avaliar a confiabilidade, a validade factorial e a invariância (por sexo da versão portuguesa do TEOSQ (Fonseca & Biddle, 2001. Integraram a amostra 1010 estudantes com uma média de idade de 15,42 anos. A análise factorial e da invariância foi avaliada através da análise factorial confirmatória. Os resultados corroboram a proposta de uma estrutura de duas subescalas (tarefa e ego. Com base nos índices de modificação e justificação teórica, o TEOSQ p foi reduzido a 12-itens, com melhores índices de adequação para o modelo oblíquo. Os resultados relativos à invariância por sexo não apresentaram apoio empírico total para a assumpção de equivalência multi-grupo, sugerindo que o TEOSQ p não parece avaliar as orientações cognitivas do mesmo modo, para os indivíduos do sexo masculino (modelo ortogonal e feminino (modelo oblíquo. Face aos resultados obtidos, foram discutidas as implicações conceptuais, empíricas, assim como os aspectos de carácter aplicado.The present research assessed the reliability, factorial validity and measurement invariance (by gender of the Portuguese version of TEOSQ -Task and Ego Orientation in Sport Questionnaire (Fonseca & Biddle, 2001. Data were collected from 1010 physical education students with a mean age of 15.42 ( SD=1.91. Factorial and invariance measurements were tested via confirmatory factorial analysis. Results supported internal consistency for the two proposed subscales (task and ego. Based on modification indices and theoretical justification the TEOSQ p was reduced to 12 items with better goodness-of-fit indices for the oblique model. The results of gender invariance did not provide full empirical support to the multi-group equivalence assumption, being suggested that TEOSQ p does not measure in the same way goal orientations for boys (orthogonal model and girls (oblique model. In light of these results, conceptual, empirical and practical

  4. Review of the acceptance tests of the W7-X superconducting magnets

    International Nuclear Information System (INIS)

    Ehmler, H.; Baldzuhn, J.; Genini, L.; Heyn, K.; Sborchia, C.; Schild, T.

    2007-01-01

    The W7-X magnet system consists of 50 non-planar coils of five different types and 20 planar coils of two different types. Factory tests of the non-planar coils are carried out at the manufacturer site of Babcock-Noell, Germany, and for the planar coils at Tesla Engineering, UK. They consist of electrical insulation checks, mass flow measurements, leak tests and sensor checks. In the test facility of CEA Saclay, France, each coil is cooled down to ∼5 K and operated at nominal current. At least one coil of each type is quenched by increasing the inlet temperature. Results of the mass flow measurements and the quench tests are presented. The manufacturing and testing progress is reviewed and the impact of technical failures is discussed. In conclusion, the scope of the tests allows a very strict quality control. This experience is highly beneficial for the construction and testing of similar components for future superconducting fusion experiments

  5. Fueled viking generator S/N 106 acceptance vibration test report

    International Nuclear Information System (INIS)

    Anderson, C.; Brewer, C.O.; Abrahamson, S.G.

    1976-01-01

    The Viking Generator S/N 106 was vibrated to the Teledyne Isotope Flight Acceptance Schedule (Random Only) with no deviation from normal generator functional output. Radiographic analysis and power tests before and after the vibration test indicated no change in the condition of the generator. The work was conducted in the Alpha Fuels Environmental Test Facility at Mound Laboratory

  6. Particle physics prospects for the KAON factory

    International Nuclear Information System (INIS)

    Bryman, D.

    1989-05-01

    The Kaon Factory at TRIUMF will produce beams of kaons, antiprotons, neutrinos and other particles with a hundred-fold increase in intensity over existing machines in the 30 GeV region. This will make possible new high precision experiments designed to test current ideas as well as high sensitivity measurements which could potentially reveal new effects. A sample of particle physics experiments involving rare kaon decays, CP and T violation studies, neutrino properties and reactions and light quark spectroscopy which might take advantage of the new opportunities presented by the Kaon Factory is discussed

  7. An Assessment of the Dimensionality and Factorial Structure of the Revised Paranormal Belief Scale.

    Science.gov (United States)

    Drinkwater, Kenneth; Denovan, Andrew; Dagnall, Neil; Parker, Andrew

    2017-01-01

    Since its introduction, the Revised Paranormal Belief Scale (RPBS) has developed into a principal measure of belief in the paranormal. Accordingly, the RPBS regularly appears within parapsychological research. Despite common usage, academic debates continue to focus on the factorial structure of the RPBS and its psychometric integrity. Using an aggregated heterogeneous sample ( N = 3,764), the present study tested the fit of 10 factorial models encompassing variants of the most commonly proposed solutions (seven, five, two, and one-factor) plus new bifactor alternatives. A comparison of competing models revealed a seven-factor bifactor solution possessed superior data-model fit (CFI = 0.945, TLI = 0.933, IFI = 0.945, SRMR = 0.046, RMSEA = 0.058), containing strong factor loadings for a general factor and weaker, albeit acceptable, factor loadings for seven subfactors. This indicated that belief in the paranormal, as measured by the RPBS, is best characterized as a single overarching construct, comprising several related, but conceptually independent subfactors. Furthermore, women reported significantly higher paranormal belief scores than men, and tests of invariance indicated that mean differences in gender are unlikely to reflect measurement bias. Results indicate that despite concerns about the content and psychometric integrity of the RPBS the measure functions well at both a global and seven-factor level. Indeed, the original seven-factors contaminate alternative solutions.

  8. An Assessment of the Dimensionality and Factorial Structure of the Revised Paranormal Belief Scale

    Directory of Open Access Journals (Sweden)

    Kenneth Drinkwater

    2017-09-01

    Full Text Available Since its introduction, the Revised Paranormal Belief Scale (RPBS has developed into a principal measure of belief in the paranormal. Accordingly, the RPBS regularly appears within parapsychological research. Despite common usage, academic debates continue to focus on the factorial structure of the RPBS and its psychometric integrity. Using an aggregated heterogeneous sample (N = 3,764, the present study tested the fit of 10 factorial models encompassing variants of the most commonly proposed solutions (seven, five, two, and one-factor plus new bifactor alternatives. A comparison of competing models revealed a seven-factor bifactor solution possessed superior data-model fit (CFI = 0.945, TLI = 0.933, IFI = 0.945, SRMR = 0.046, RMSEA = 0.058, containing strong factor loadings for a general factor and weaker, albeit acceptable, factor loadings for seven subfactors. This indicated that belief in the paranormal, as measured by the RPBS, is best characterized as a single overarching construct, comprising several related, but conceptually independent subfactors. Furthermore, women reported significantly higher paranormal belief scores than men, and tests of invariance indicated that mean differences in gender are unlikely to reflect measurement bias. Results indicate that despite concerns about the content and psychometric integrity of the RPBS the measure functions well at both a global and seven-factor level. Indeed, the original seven-factors contaminate alternative solutions.

  9. MODEL PENGELOLAAN TEACHING FACTORY SEKOLAH MENENGAH KEJURUAN

    Directory of Open Access Journals (Sweden)

    M Burhan R Wijaya

    2013-02-01

    Full Text Available This study aims to identify and develop management models Factory Teaching Vocational School through a series of tests and validation of the model with the approach of reasearch and Development. Teaching Factory Management Models at Vocational Schools is a concept that combines learning management approach learning Competency Based Training (CBT and Production Based Training (PBT in the real atmosphere so that the process of achieving competence or skill skills life skills (life skills in accordance with the standards of graduate work in the industrial world. In particular, this study aims to formulate design management model development Teaching Factory Vocational School. To achieve the research objectives above using the approach of Research and Development, through preliminary studies, design development models, testing and validation. Preliminary study phase is planned to take the flow / stage as follows: the study of literature, study / collection of field data, and a description and analysis of field findings (factual, namely: (1 the description of the characteristics of vocational school with a standard performance indicators that can be poured as the content of the development of Teaching Factory, (2 description of the characteristics and potential development group management model Tefa as an outcome groups to develop and implement management models Tefa for Vocational Schools (3 description of the characteristics of potential stakeholders to support the development and implementation TEFA management model, and (4 preparation of the management model TEFA for Vocational Schools excellence and innovative. Trial design done on a limited scale model group. Then the model was accompanied by outcome group to develop and implement a model TEFA for Vocational Schools to determine whether the model developed can be applied correctly. Data analysis in this study, the preliminary study stage, the findings or the facts about productive learning

  10. Low acceptance of HSV-2 testing among high-risk women.

    Science.gov (United States)

    Roth, A M; Dodge, B M; Van Der Pol, B; Reece, M; Zimet, G D

    2011-06-01

    We evaluated the acceptability of a community-based herpes simplex virus type 2 (HSV-2) screening programme for at-risk women and assessed factors related to uptake of point of care HSV-2 testing. One hundred recently arrested women (median age 34 years) were recruited from a community court handling lower-level misdemeanour cases in Indianapolis, Indiana. Individuals completed a survey assessing factors related to HSV-2 screening intentions and were offered point of care HSV-2 testing. Rates of HSV-2 infection in this population are high; 61.1% of women tested were positive. The majority (81%) accepted a prescription for suppressive therapy. Women in this sample indicated that HSV-2 screening is an important component of health care but were unwilling to pay the US$10 it cost to be tested. To encourage this and other high-risk populations to be screened for HSV-2, public health resources will be needed to help individuals overcome cost-related barriers to care.

  11. Acceptance of HIV testing among women attending antenatal care in south-western Uganda: risk factors and reasons for test refusal.

    Science.gov (United States)

    Dahl, V; Mellhammar, L; Bajunirwe, F; Björkman, P

    2008-07-01

    A problem commonly encountered in programs for prevention of mother-to-child-transmission (PMTCT) of HIV in sub-Saharan Africa is low rates of HIV test acceptance among pregnant women. In this study, we examined risk factors and reasons for HIV test refusal among 432 women attending three antenatal care clinics offering PMTCT in urban and semi-urban parts of the Mbarara district, Uganda. Structured interviews were performed following pre-test counselling. Three-hundred-eighty women were included in the study, 323 (85%) of whom accepted HIV testing. In multivariate analysis, testing site (Site A: OR = 1.0; Site B: OR = 3.08; 95%CI: 1.12-8.46; Site C: OR = 5.93; 95%CI: 2.94-11.98), age between 30 and 34 years (refusal. Testing sites operating for longer durations had higher rates of acceptance. The most common reasons claimed for test refusal were: lack of access to antiretroviral therapy (ART) for HIV-infected women (88%; n=57), a need to discuss with partner before decision (82%; n=57) and fear of partner's reaction (54%; n=57). Comparison with previous periods showed that the acceptance rate increased with the duration of the program. Our study identified risk factors for HIV test refusal among pregnant women in Uganda and common reasons for not accepting testing. These findings may suggest modifications and improvements in the performance of HIV testing in this and similar populations.

  12. Factorial structure of the 'ToM Storybooks': A test evaluating multiple components of Theory of Mind.

    Science.gov (United States)

    Bulgarelli, Daniela; Testa, Silvia; Molina, Paola

    2015-06-01

    This study examined the factorial structure of the Theory of Mind (ToM) Storybooks, a comprehensive 93-item instrument tapping the five components in Wellman's model of ToM (emotion recognition, understanding of desire and beliefs, ability to distinguish between physical and mental entities, and awareness of the link between perception and knowledge). A sample of 681 three- to eight-year-old Italian children was divided into three age groups to assess whether factorial structure varied across different age ranges. Partial credit model analysis was applied to the data, leading to the empirical identification of 23 composite variables aggregating the ToM Storybooks items. Confirmatory factor analysis was then conducted on the composite variables, providing support for the theoretical model. There were partial differences in the specific composite variables making up the dimensions for each of the three age groups. A single test evaluating distinct dimensions of ToM is a valuable resource for clinical practice which may be used to define differential profiles for specific populations. © 2014 The British Psychological Society.

  13. Test results of distributed ion pump designs for the PEP-II Asymmetric B-Factory collider

    Energy Technology Data Exchange (ETDEWEB)

    Calderon, M.; Holdener, F.; Peterson, D. [Lawrence Livermore National Lab., CA (United States)] [and others

    1994-07-01

    The testing facility measurement methods and results of prototype distributed ion pump (DIP) designs for the PEP-II B-Factory High Energy Ring are presented. Two basic designs with 5- or 7-anode plates were tested at LLNL with penning cell sizes of 15, 18, and 21 mm. Direct comparison of 5- and 7-plate anodes with 18 mm holes shows increased pumping speed with the 7-plate design. The 5-plate, 18 mm and 7-plate, 15 mm designs both gave an average pumping speed of 135 1/s/m at 1 {times} 10{sup {minus}8} Torr nitrogen base pressure in a varying 0.18 T peak B-field. Comparison of the three hole sizes indicates that cells smaller than the 15 mm tested can be efficiently used to obtain higher pumping speeds for the same anode plate sizes used.

  14. Test results of distributed ion pump designs for the PEP-II Asymmetric B-Factory collider

    International Nuclear Information System (INIS)

    Calderon, M.; Holdener, F.; Peterson, D.

    1994-07-01

    The testing facility measurement methods and results of prototype distributed ion pump (DIP) designs for the PEP-II B-Factory High Energy Ring are presented. Two basic designs with 5- or 7-anode plates were tested at LLNL with penning cell sizes of 15, 18, and 21 mm. Direct comparison of 5- and 7-plate anodes with 18 mm holes shows increased pumping speed with the 7-plate design. The 5-plate, 18 mm and 7-plate, 15 mm designs both gave an average pumping speed of 135 1/s/m at 1 x 10 -8 Torr nitrogen base pressure in a varying 0.18 T peak B-field. Comparison of the three hole sizes indicates that cells smaller than the 15 mm tested can be efficiently used to obtain higher pumping speeds for the same anode plate sizes used

  15. Project W-151 flexible receiver radiation detector system acceptance test plan. Revision 1

    International Nuclear Information System (INIS)

    Troyer, G.L.

    1994-01-01

    The attached document is the Acceptance Test Plan for the portion of Project W-151 dealing with acceptance of gamma-ray detectors and associated electronics manufactured at the Idaho National Engineering Laboratory (INEL). The document provides a written basis for testing the detector system, which will take place in the 305 building (300 Area)

  16. 78 FR 38411 - Vogtle Electric Generating Plant, Unit 4; Inspections, Tests, Analyses, and Acceptance Criteria

    Science.gov (United States)

    2013-06-26

    ... Plant, Unit 4; Inspections, Tests, Analyses, and Acceptance Criteria AGENCY: Nuclear Regulatory Commission. ACTION: Determination of inspections, tests, analyses, and acceptance criteria completion. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has determined that the inspections, tests...

  17. PUREX (SAMCONS) uninterruptible power supply (UPS) acceptance test procedure

    International Nuclear Information System (INIS)

    Blackaby, W.B.

    1997-01-01

    This Acceptance Test Procedure for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) provides for testing and verifying the proper operation of the control panel alarms and trouble functions, the 6roper functioning of the AC inverter, ability of the battery supply to maintain the SAMCONS load for a minimum of two hours , and proper interaction with the SAMCONS Video graphic displays for alarm displays

  18. Proposal for testing lepton universality in upsilon decays at a B factory running at Υ(3S)

    International Nuclear Information System (INIS)

    Sanchis-Lozano, Miguel-Angel

    2007-01-01

    A proposal is presented for detecting new physics at a B factory running at the Υ(3S) resonance by testing lepton universality to the few percent level in the leptonic decays of the Υ(1S) and Υ(2S) resonances tagged by the dipion in the chain decay: Υ(3S) → π + π - Υ(1S,2S); Υ(1S,2S) → l + l - , l=e,μ,τ. (author)

  19. Acceptability of routine offer of HIV testing (opt-out approach) among ...

    African Journals Online (AJOL)

    Background: With the introduction of the opt out HIV testing policy in Ghana, the HIV test is offered routinely to all pregnant women unless they decline testing. Objective: To assess acceptability of the routine offer of HIV testing antenatal clinic (ANC) clients in the Wa municipality, Ghana. Design: Cross-sectional study of 270 ...

  20. 46 CFR 159.007-5 - Production inspections and tests: Application for acceptance.

    Science.gov (United States)

    2010-10-01

    ... acceptance. 159.007-5 Section 159.007-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF EQUIPMENT AND MATERIALS...) Is accepted by the Commandant for approval inspections and tests of the equipment or material under...

  1. Acceptance test procedure for a portable, self-contained nitrogen supply

    International Nuclear Information System (INIS)

    Kostelnik, A.J.

    1994-01-01

    This Acceptance Test Procedure (ATP) will document compliance with the requirements of WHC-S-0249 Rev. 1 and ECN 606112. The equipment being tested is a Portable, Self-Contained Nitrogen Supply. The unit was purchased as a Design and Fabrication procurement activity. The Functional Test was written by the Seller and is contained in Appendix A. The Functional test will be performed by the Seller with representatives of the Westinghouse Hanford Company performing inspection and witnessing the functional test at the Seller's location

  2. W-026 acceptance test report system integration equipment (SIE)(submittal {number_sign} 018.6.A)

    Energy Technology Data Exchange (ETDEWEB)

    Watson, T.L.

    1997-01-27

    Acceptance testing of the System Integration Equipment (SIE) at Hanford was performed in two stages. The first was inconclusive, and resulted in a number of findings. These finding. are summarized as part of this report. The second stage of testing addressed these findings, and performed full system testing per the approved test procedure. This report includes summaries of all testing, results and finding.. Although the SIE did not in some cases perform as required for plant operations, it did perform per the system specification. (These discrepancies were noted and are addressed elsewhere.) Following testing, the system was formaLLy accepted. Documentation of this acceptance is incLuded in this report.

  3. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid L

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''L''. The ATP will be performed after the construction of the PIC skid in the shop

  4. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid N

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''N''. The ATP will be performed after the construction of the PIC skid in the shop

  5. 242-A MCS Logic Acceptance Test Report for Year 2000 Upgrade

    International Nuclear Information System (INIS)

    TEATS, M.C.

    1999-01-01

    242-A Evaporator distributive control system upgrade to D/3 version 9.0-2 for year 2000 compliance. Testing was performed per test procedure HNF-3568. There were no unresolved exceptions. The system responded correctly to all testing and meets the requirements to operate the 242-A This report documents the acceptance test results for the Evaporator facility

  6. Acceptance/Operational Test Report for Tank 241-AN-104 camera and camera purge control system

    International Nuclear Information System (INIS)

    Castleberry, J.L.

    1995-11-01

    This Acceptance/Operational Test Procedure (ATP/OTP) will document the satisfactory operation of the camera purge panel, purge control panel, color camera system and associated control components destined for installation. The final acceptance of the complete system will be performed in the field. The purge panel and purge control panel will be tested for its safety interlock which shuts down the camera and pan-and-tilt inside the tank vapor space during loss of purge pressure and that the correct purge volume exchanges are performed as required by NFPA 496. This procedure is separated into seven sections. This Acceptance/Operational Test Report documents the successful acceptance and operability testing of the 241-AN-104 camera system and camera purge control system

  7. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''P''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  8. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid W

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''W''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  9. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control. (PIC) skid designed as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  10. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''V''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  11. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''Q''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  12. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''T''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  13. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing Of the new Pumping Instrumentation and Control (PIC) skid designed as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  14. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid R

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''R''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  15. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''U''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''U''. The ATP will be performed after the construction of the PIC skid in the fabrication shop

  16. Optimized FFTF Acceptance Test Program covering Phases III, IV, and V

    International Nuclear Information System (INIS)

    Wykoff, W.R.; Jones, D.H.

    1977-03-01

    A detailed review of Phases III, IV, and V of the FFTF Acceptance Test Program has been completed. The purpose of this review was to formulate that test sequence which not only meets requirements for safe, reliable and useful operation of the plant, but also results in the earliest prudent demonstration of full-power performance. A test sequence based on the underlying assumption that sodium flows into the secondary sodium storage tank (T-44) no later than August 31, 1978, is described in detail. A time-scale which allows extra time to put systems and equipment into operation the first time, debugging, and learning how to operate most effectively has been superimposed on the test sequence. Time is not included for major equipment malfunctions. This test plan provides the basis for coordinating the many and varied activities and interfaces necessary for successful and timely execution of the FFTF Acceptance Test Program. In this report, the need dates have been identified for presently scheduled test articles and standard core components

  17. The tau-charm factory: Experimental perspectives

    International Nuclear Information System (INIS)

    Perl, M.L.; Schindler, R.H.

    1991-09-01

    This report discusses the Tau-Charm Factory Concept; D and D S Physics at the Tau-Charm Factory; τ and ν τ Physics at the Tau-Charm Factory; and Charmonium, Gluonium and Light Quark Spectroscopy at the Tau-Charm Factory

  18. Test results of pre-production prototype distributed ion pump design for the PEP-II Asymmetric B-Factory collider

    Energy Technology Data Exchange (ETDEWEB)

    Holdener, F.R.; Behne, D.; Hathaway, D. [and others

    1995-04-24

    We have built and tested a plate-type pre-production distributed Ion Pump (DIP) for the PEP-II B-Factory High Energy Ring (HER). The design has been an earlier design to use less materials and to costs. Penning cell hole sizes of 15, 18, and 21 mm have been tested in a uniform magnetic field of 0.18 T to optimize pumping speed. The resulting final DIP design consisting of a 7-plate, 15 mm basic cell size anode was magnetic field of the HER dipole. A description of the final optimized DIP design will be presented along with the test results of the pumping speed measurements.

  19. Acceptance test report for the Tank 241-C-106 in-tank imaging system

    International Nuclear Information System (INIS)

    Pedersen, L.T.

    1998-01-01

    This document presents the results of Acceptance Testing of the 241-C-106 in-tank video camera imaging system. The purpose of this imaging system is to monitor the Project W-320 sluicing of Tank 241-C-106. The objective of acceptance testing of the 241-C-106 video camera system was to verify that all equipment and components function in accordance with procurement specification requirements and original equipment manufacturer's (OEM) specifications. This document reports the results of the testing

  20. Acceptance Testing of Thermoluminescent Dosimeter Holders.

    Science.gov (United States)

    Romanyukha, Alexander; Grypp, Matthew D; Sharp, Thad J; DiRito, John N; Nelson, Martin E; Mavrogianis, Stanley T; Torres, Jeancarlo; Benevides, Luis A

    2018-05-01

    The U.S. Navy uses the Harshaw 8840/8841 dosimetric (DT-702/PD) system, which employs LiF:Mg,Cu,P thermoluminescent dosimeters (TLDs), developed and produced by Thermo Fisher Scientific (TFS). The dosimeter consists of four LiF:Mg,Cu,P elements, mounted in Teflon® on an aluminum card and placed in a plastic holder. The holder contains a unique filter for each chip made of copper, acrylonitrile butadiene styrene (ABS), Mylar®, and tin. For accredited dosimetry labs, the ISO/IEC 17025:2005(E) requires an acceptance procedure for all new equipment. The Naval Dosimetry Center (NDC) has developed and tested a new non-destructive procedure, which enables the verification and the evaluation of embedded filters in the holders. Testing is based on attenuation measurements of low-energy radiation transmitted through each filter in a representative sample group of holders to verify that the correct filter type and thickness are present. The measured response ratios are then compared with the expected response ratios. In addition, each element's measured response is compared to the mean response of the group. The test was designed and tested to identify significant nonconformities, such as missing copper or tin filters, double copper or double tin filters, or other nonconformities that may impact TLD response ratios. During the implementation of the developed procedure, testing revealed a holder with a double copper filter. To complete the evaluation, the impact of the nonconformities on proficiency testing was examined. The evaluation revealed failures in proficiency testing categories III and IV when these dosimeters were irradiated to high-energy betas.

  1. Factorial Validity and Invariance Testing of the Exercise Dependence Scale-Revised in Swedish and Portuguese Exercisers

    Science.gov (United States)

    Lindwall, Magnus; Palmeira, Antonio

    2009-01-01

    The present study investigated the factorial validity and factorial invariance of the 21-item Exercise Dependence Scale-Revised using 162 Swedish and 269 Portuguese exercisers. In addition, the prevalence of exercise dependence symptoms and links to exercise behavior, gender, and age in the two samples was also studied. Confirmatory factor…

  2. Void fraction instrument software, Version 1,2, Acceptance test report

    International Nuclear Information System (INIS)

    Gimera, M.

    1995-01-01

    This provides the report for the void fraction instrument acceptance test software Version 1.2. The void fraction will collect data that will be used to calculate the quantity of gas trapped in waste tanks

  3. ENRAF Series 854 Advanced Technology Gauge (ATG) Acceptance Test Procedure

    International Nuclear Information System (INIS)

    HUBER, J.H.

    1999-01-01

    This procedure provides acceptance testing for Enraf Series 854 level gauges used to monitor levels in Hanford Waste Storage Tanks. The test will verify that the gauge functions according to the manufacturer's instructions and specifications and is properly setup prior to being delivered to the tank farm area. This ATP does not set up the gauge for any specific tank, but is generalized to permit testing the gauge prior to installation package preparation

  4. 78 FR 65007 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3

    Science.gov (United States)

    2013-10-30

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 052-00026; NRC-2008-0252] Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3 AGENCY: Nuclear Regulatory Commission. ACTION: Determination of inspections, tests, analyses, and acceptance criteria completion...

  5. Review of kaon factory proposals

    International Nuclear Information System (INIS)

    Thiessen, H.A.

    1985-01-01

    Nuclear physics issues and particle physics issues for a kaon factory are discussed. Kaon factory accelerator proposals are then considered. Secondary beam considerations are covered and hardware development for a kaon factory is discussed. The prospects for construction are presented. 9 refs., 12 figs., 2 tabs

  6. Neutrino factories

    International Nuclear Information System (INIS)

    Dydak, F.

    2002-01-01

    The discovery of neutrino oscillations marks a major milestone in the history of neutrino physics, and opens a window to what lies beyond the Standard Model. Many current and forthcoming experiments will answer open questions; however, a major step forward, up to and possibly including CP violation in the neutrino mixing matrix, will be offered by the neutrino beams from a neutrino factory. The neutrino factory is a new concept for producing neutrino beams of unprecedented quality in terms of intensity, flavour composition, and precision of the beam parameters. These beams enable the exploration of otherwise inaccessible domains in neutrino oscillation physics by exploiting baselines of planetary dimensions. Suitable detectors pose formidable challenges but seem within reach with only moderate extrapolations from existing technologies. Although the main physics attraction of the neutrino factory is in the area of neutrino oscillations, an interesting spectrum of further opportunities ranging from high-precision, high-rate neutrino scattering to physics with high-intensity stopped muons comes with it

  7. Neutrino Factory

    CERN Document Server

    Bogomilov, M; Tsenov, R; Dracos, M; Bonesini, M; Palladino, V; Tortora, L; Mori, Y; Planche, T; Lagrange, J  B; Kuno, Y; Benedetto, E; Efthymiopoulos, I; Garoby, R; Gilardoini, S; Martini, M; Wildner, E; Prior, G; Blondel, A; Karadzhow, Y; Ellis, M; Kyberd, P; Bayes, R; Laing, A; Soler, F  J  P; Alekou, A; Apollonio, M; Aslaninejad, M; Bontoiu, C; Jenner, L  J; Kurup, A; Long, K; Pasternak, J; Zarrebini, A; Poslimski, J; Blackmore, V; Cobb, J; Tunnell, C; Andreopoulos, C; Bennett, J  R  J; Brooks, S; Caretta, O; Davenne, T; Densham, C; Edgecock, T  R; Fitton, M; Kelliher, D; Loveridge, P; McFarland, A; Machida, S; Prior, C; Rees, G; Rogers, C; Rooney, M; Thomason, J; Wilcox, D; Booth, C; Skoro, G; Back, J  J; Harrison, P; Berg, J  S; Fernow, R; Gallardo, J  C; Gupta, R; Kirk, H; Simos, N; Stratakis, D; Souchlas, N; Witte, H; Bross, A; Geer, S; Johnstone, C; Mokhov, N; Neuffer, D; Popovic, M; Strait, J; Striganov, S; Morfín, J  G; Wands, R; Snopok, P; Bogacz, S  A; Morozov, V; Roblin, Y; Cline, D; Ding, X; Bromberg, C; Hart, T; Abrams, R  J; Ankenbrandt, C  M; Beard, K  B; Cummings, M  A  C; Flanagan, G; Johnson, R  P; Roberts, T  J; Yoshikawa, C  Y; Graves, V  B; McDonald, K  T; Coney, L; Hanson, G

    2014-01-01

    The properties of the neutrino provide a unique window on physics beyond that described by the standard model. The study of subleading effects in neutrino oscillations, and the race to discover CP-invariance violation in the lepton sector, has begun with the recent discovery that $\\theta_{13} > 0$. The measured value of $\\theta_{13}$ is large, emphasizing the need for a facility at which the systematic uncertainties can be reduced to the percent level. The neutrino factory, in which intense neutrino beams are produced from the decay of muons, has been shown to outperform all realistic alternatives and to be capable of making measurements of the requisite precision. Its unique discovery potential arises from the fact that only at the neutrino factory is it practical to produce high-energy electron (anti)neutrino beams of the required intensity. This paper presents the conceptual design of the neutrino factory accelerator facility developed by the European Commission Framework Programme 7 EURO$\

  8. 78 FR 53483 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3

    Science.gov (United States)

    2013-08-29

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 052-00025; NRC-2008-0252] Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 3 AGENCY: Nuclear Regulatory Commission. ACTION: Determination of inspections, tests, analyses, and acceptance criteria (ITAAC) completion...

  9. 78 FR 53484 - Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 4

    Science.gov (United States)

    2013-08-29

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 052-00026; NRC-2008-0252] Inspections, Tests, Analyses, and Acceptance Criteria; Vogtle Electric Generating Plant, Unit 4 AGENCY: Nuclear Regulatory Commission. ACTION: Determination of inspections, tests, analyses, and acceptance criteria (ITAAC) completion...

  10. 100% anthracite burning at the Hoang Mai cement factory (Viet-Nam); Calcination 100% anthracite a la cimenterie de Hoang Mai (Viet-Nam)

    Energy Technology Data Exchange (ETDEWEB)

    Jorget, S. [Fcb Ciment, 59 - Villeneuve d' Ascq (France)

    2003-07-01

    The Hoang Mai cement factory is a greenfield plant whose contract (design and supply of equipment) was awarded o the French company Fcb.ciment, while the owner kept the responsibility of civil works and of erection. The contract was signed in late 1997. The commissioning began in September 2001, and the burning line was started on February 27, 2002. Clinker production started from this day, and after two months devoted to equipment adjustments, performance tests were carried out. The provisional acceptance certificate was delivered in August 2002. (author)

  11. Superconducting cavities for beauty factories

    International Nuclear Information System (INIS)

    Lengeler, H.

    1992-01-01

    The possibilities and merits of superconducting accelerating cavities for Beauty-factories are considered. There exist already large sc systems of size and frequency comparable to the ones needed for Beauty-factories. Their status and operation experience is discussed. A comparison of normal conducting and superconducting systems is done for two typical Beauty-factory rings

  12. Super B Factories

    Indian Academy of Sciences (India)

    B factory; CP violation; B meson; supersymmetry. PACS Nos 11.30.Hv; 11.30.Pb; 12.15.Hh; 12.15.Mm; 13.20.He; 13.20.Fc;. 13.35.Dx; 14.65.Fy. 1. Introduction. The two asymmetric B factories, PEP-II and KEK-B, and their companion detec- tors, BABAR and Belle, have produced a wealth of flavor physics results, subjecting.

  13. Acceptance test procedure MICON software exhaust fan control modifications; TOPICAL

    International Nuclear Information System (INIS)

    SILVAN, G.R.

    1999-01-01

    This acceptance test verifies the MICON program changes for the new automatic transfer switch ATS-2 alarms, the Closed Loop Cooling isolator status, the CB-3 position alarm, and the alarms for the new emergency fan damper backup air compressor

  14. KE basin recirculation/skimmer/IX systems restart acceptance test report

    International Nuclear Information System (INIS)

    Derosa, D.C.

    1996-01-01

    The 105 KE Basin Recirculation System and Skimmer Loop have been upgraded to provide the flexibility to run the Ion Exchange Modules on either system to support spent fuel removal for the Spent Nuclear Fuel Project. This Acceptance Test Report Provides the documentation of the leak Testing for the construction work associated with the IXM inlet and outlet piping, places the cartridge filters back in service and provides the functional testing of the IXM's on the recirculation and skimmer systems

  15. Nevada test site defense waste acceptance criteria, certification, and transfer requirements

    International Nuclear Information System (INIS)

    1988-10-01

    The Nevada Test Site (NTS) Defense Waste Acceptance Criteria, Certification and Transfer Requirements establishes procedures and criteria for safe transfer, disposal, and storage of defense transuranic, low-level, and mixed waste at the NTS. Included are an overview of the NTS defense waste management program; the NTS waste acceptance criteria for transuranic, low-level, and mixed wastes; waste certification requirements and guidance; application to submit waste; and requirements for waste transfer and receipt. 5 figs., 16 tabs

  16. Planned Positron Factory project

    International Nuclear Information System (INIS)

    Okada, Sohei

    1990-01-01

    The Japan Atomic Energy Research Institute, JAERI, has started, drafting a construction plan for the 'Positron Factory', in which intense energy-controllable monoenergetic positron beams are produced from pair-production reactions caused by high-energy electrons from a linac. The JAERI organized a planning committee to provide a basic picture for the Positron Factory. This article presents an overview of the interactions of positrons, intense positron sources and the research program and facilities planned for the project. The interactions of positrons and intense positron sources are discussed focusing on major characteristics of positrons in different energy ranges. The research program for the Positron Factory is then outlined, focusing on advanced positron annihilation techniques, positron spectroscopy (diffraction, scattering, channeling, microscopy), basic positron physics (exotic particle science), and positron beam technology. Discussion is also made of facilities required for the Positron Factory. (N.K.)

  17. Factor structure of the pictorial scale of perceived competence and social acceptance with two pre-elementary samples.

    Science.gov (United States)

    Mantzicopoulos, Panayota; French, Brian F; Maller, Susan J

    2004-01-01

    Competing models of the factorial structure of the Pictorial Scale of Perceived Competence and Social Acceptance (PSPCSA) were tested for fit using multisample confirmatory factor analysis. The best fitting model was tested for invariance (a) across samples of middle-class (n = 251) and economically disadvantaged (Head Start, n = 117) kindergarten children (whose ages ranged from 67 to 86 months), and (b) over time (at the end of preschool and kindergarten) for the Head Start sample. For kindergarten children, regardless of socioeconomic status, the factor structure of the PSPCSA was consistent with the 2-factor model of Competence and Acceptance. This model also fit reasonably well for Head Start children at the end of their preschool year. However, in addition to providing broad support for the dimensionality of the measure, our findings highlight important concerns about the PSPCSA. Copyright 2004 Society for Research in Child Development, Inc.

  18. Acceptance test procedure, 241-SY-101/241-C-106 shot loading system

    International Nuclear Information System (INIS)

    Ostrom, M.J.

    1994-01-01

    This Acceptance Test Procedure is for the 241-SY-101/241-C-106 Shot Loading System. The procedure will test the components of the Shot Loading System and its capability of adequately loading shot into the annular space of the Container. The loaded shot will provide shielding as required for transporting and storage of a contaminated pump after removal from the tank. This test serves as verification that the SLS is acceptable for use in the pump removal operations for Tanks 241-SY-101, 241-C-106 and 241-AY-102. The pump removal operation for these three tanks will be performed by two different organizations with different equipment, but the Shot Loading System will be compatible between the two operations

  19. Dissolution test for low-activity waste product acceptance

    International Nuclear Information System (INIS)

    Ebert, W. L.

    1998-01-01

    We have measured the mean and standard deviation of the solution concentrations of B, Na, and Si attained in replicate dissolution tests conducted at temperatures of 20, 40, and 70 C, for durations of 3 and 7 days, and at glass/water mass ratios of 1:10 and 1:1. These and other tests were conducted to evaluate the adequacy of the test methods specified in privatization contracts and to develop a data base that can be used to evaluate the reliability of reported results for tests performed on the waste products. Tests were conducted with a glass that we formulated to be similar to low-activity waste products that will be produced during the remediation of Hanford tank wastes. Statistical analyses indicated that, while the mean concentrations of B, Na, and Si were affected by the values of test parameters, the standard deviation of replicate tests was not. The precision of the tests was determined primarily by uncertainties in the analysis of the test solutions. Replicate measurements of other glass properties that must be reported for Hanford low-activity waste products were measured to evaluate the possible adoption of the glass used in these tests as a standard test material for the product acceptance process

  20. Factories, Monitorial Schools and Jeremy Bentham: The Origins of "The Management Syndrome" in Popular Education

    Science.gov (United States)

    Miller, P. J.

    1973-01-01

    Suggests that the origins of the business management syndrome'' in popular education are to be found in two distinct yet not unrelated developments of the 19th century -- the success and consequent prestige of the early factory system, and the growing acceptance in the English speaking world of utilitarian ethical theory as it related to the…

  1. Current use and acceptability of novel diagnostic tests for active tuberculosis: a worldwide survey

    Directory of Open Access Journals (Sweden)

    Massimo Amicosante

    Full Text Available ABSTRACT Objective: To determine the current use and potential acceptance (by tuberculosis experts worldwide of novel rapid tests for the diagnosis of tuberculosis that are in line with World Health Organization target product profiles. Methods: A multilingual survey was disseminated online between July and November of 2016. Results: A total of 723 individuals from 114 countries responded to the survey. Smear microscopy was the most commonly used rapid tuberculosis test (available to 90.9% of the respondents, followed by molecular assays (available to 70.7%. Only a small proportion of the respondents in middle- and low-income countries had access to interferon-gamma-release assays. Serological and lateral flow immunoassays were used by more than a quarter (25.4% of the respondents. Among the respondents who had access to molecular tests, 46.7% were using the Xpert assay overall, that proportion being higher in lower middle-income countries (55.6% and low-income countries (76.6%. The data also suggest that there was some alignment of pricing for molecular assays. Respondents stated they would accept novel rapid tuberculosis tests if available, including molecular assays (acceptable to 86.0% or biomarker-based serological assays (acceptable to 81.7%. Simple biomarker-based assays were more commonly deemed acceptable in middle- and low-income countries. Conclusions: Second-generation molecular assays have become more widely available in high- and low-resource settings. However, the development of novel rapid tuberculosis tests continues to be considered important by tuberculosis experts. Our data also underscore the need for additional training and education of end users.

  2. Acceptance test for 900 MWe PWR unit replacement steam generators

    International Nuclear Information System (INIS)

    Gourguechon, B.

    1993-01-01

    During the first half of 1994, the Gravelines 1 steam generators will be replaced (SG replacement procedure). The new SG's differ from the former components notably by the alloy used for the tube bundle, in this case, the high chromium content Inconel 690. So, from this standpoint, they are to be considered as PWR 900 replacement SG first models and their thermal efficiency has consequently to be assessed. This will provide an opportunity of ensuring that the performance of the components delivered is in compliance with requirements and of making the necessary provisions if significant deviations are observed. The EFMT branch, which has been in charge of the instrumentation and acceptance of the different SG first models since the first PWR plants were commissioned, will be responsible for the acceptance tests and the ultimate validation of a performance assessment procedure applicable to the future replacement steam generators. The methods and tests proposed for SG expert appraisal are based on consideration of the importance of primary measurement quality for satisfactory SG assessment and of the new test facilities with which the 900 and 1 300 PWR plants are gradually being equipped. These facilities provide an on-site computer environment for tests compatible with the tools (PATTERN, etc.) used at EFMT and in other departments. This test is the first of this kind performed by EFMT and the test facility of a nuclear power plant. (author). 6 figs

  3. Towards energy transparent factories

    CERN Document Server

    Posselt, Gerrit

    2016-01-01

    This monograph provides a methodological approach for establishing demand-oriented levels of energy transparency of factories. The author presents a systematic indication of energy drivers and cost factors, taking into account the interdependencies between facility and production domains. Particular attention is given to energy flow metering and monitoring. Readers will also be provided with an in-depth description of a planning tool which allows for systematically deriving suitable metering points in complex factory environments. The target audience primarily comprises researchers and experts in the field of factory planning, but the book may also be beneficial for graduate students.

  4. Modeling of a Parabolic Trough Solar Field for Acceptance Testing: A Case Study

    Energy Technology Data Exchange (ETDEWEB)

    Wagner, M. J.; Mehos, M. S.; Kearney, D. W.; McMahan, A. C.

    2011-01-01

    As deployment of parabolic trough concentrating solar power (CSP) systems ramps up, the need for reliable and robust performance acceptance test guidelines for the solar field is also amplified. Project owners and/or EPC contractors often require extensive solar field performance testing as part of the plant commissioning process in order to ensure that actual solar field performance satisfies both technical specifications and performance guaranties between the involved parties. Performance test code work is currently underway at the National Renewable Energy Laboratory (NREL) in collaboration with the SolarPACES Task-I activity, and within the ASME PTC-52 committee. One important aspect of acceptance testing is the selection of a robust technology performance model. NREL1 has developed a detailed parabolic trough performance model within the SAM software tool. This model is capable of predicting solar field, sub-system, and component performance. It has further been modified for this work to support calculation at subhourly time steps. This paper presents the methodology and results of a case study comparing actual performance data for a parabolic trough solar field to the predicted results using the modified SAM trough model. Due to data limitations, the methodology is applied to a single collector loop, though it applies to larger subfields and entire solar fields. Special consideration is provided for the model formulation, improvements to the model formulation based on comparison with the collected data, and uncertainty associated with the measured data. Additionally, this paper identifies modeling considerations that are of particular importance in the solar field acceptance testing process and uses the model to provide preliminary recommendations regarding acceptable steady-state testing conditions at the single-loop level.

  5. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid M

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping and Instrumentation Control (PIC) skid ''M''. The Scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Service's (SFS) shop upon completion of construction of the PIC skid

  6. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''V''

    International Nuclear Information System (INIS)

    KOCH, M.R.

    2000-01-01

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping Instrumentation and Control (PIC) skid ''V''. The scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Services (SFS) shop upon completion of the construction of the PIC skid

  7. Project W-049H Collection System Acceptance Test

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The Acceptance Test Procedure (ATP) Program for Project W-049H covers the following activities: Disposal system, Collection system, Instrumentation and control system. Each activity has its own ATP. The purpose of the ATPs is to verify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. This ATP has been prepared to demonstrate that the Collection System Instrumentation functions as required by project criteria

  8. Deciding WQO for factorial languages

    KAUST Repository

    Atminas, Aistis; Lozin, Vadim V.; Moshkov, Mikhail

    2013-01-01

    A language is factorial if it is closed under taking factors (i.e. contiguous subwords). Every factorial language can be described by an antidictionary, i.e. a minimal set of forbidden factors. We show that the problem of deciding whether a factorial language given by a finite antidictionary is well-quasi-ordered under the factor containment relation can be solved in polynomial time. © 2013 Springer-Verlag Berlin Heidelberg.

  9. Deciding WQO for factorial languages

    KAUST Repository

    Atminas, Aistis

    2013-04-05

    A language is factorial if it is closed under taking factors (i.e. contiguous subwords). Every factorial language can be described by an antidictionary, i.e. a minimal set of forbidden factors. We show that the problem of deciding whether a factorial language given by a finite antidictionary is well-quasi-ordered under the factor containment relation can be solved in polynomial time. © 2013 Springer-Verlag Berlin Heidelberg.

  10. In-Factory Learning - Qualification For The Factory Of The Future

    Science.gov (United States)

    Quint, Fabian; Mura, Katharina; Gorecky, Dominic

    2015-07-01

    The Industry 4.0 vision anticipates that internet technologies will find their way into future factories replacing traditional components by dynamic and intelligent cyber-physical systems (CPS) that combine the physical objects with their digital representation. Reducing the gap between the real and digital world makes the factory environment more flexible, more adaptive, but also more complex for the human workers. Future workers require interdisciplinary competencies from engineering, information technology, and computer science in order to understand and manage the diverse interrelations between physical objects and their digital counterpart. This paper proposes a mixed-reality based learning environment, which combines physical objects and visualisation of digital content via Augmented Reality. It uses reality-based interaction in order to make the dynamic interrelations between real and digital factory visible and tangible. We argue that our learning system does not work as a stand-alone solution, but should fit into existing academic and advanced training curricula.

  11. Factors associated with willingness to accept oral fluid HIV rapid testing among most-at-risk populations in China.

    Directory of Open Access Journals (Sweden)

    Huanmiao Xun

    Full Text Available The availability of oral fluid HIV rapid testing provides an approach that may have the potential to expand HIV testing in China, especially among most-a-risk populations. There are few investigations about the acceptability of oral fluid HIV testing among most-at-risk populations in China.A cross-sectional study with men who have sex with men (MSM, female sex workers (FSW and voluntary counseling and testing (VCT clients was conducted in three cities of Shandong province, China from 2011 to 2012. Data were collected by face-to-face questionnaire.About 71% of participants were willing to accept the oral fluid HIV rapid testing, and home HIV testing was independently associated with acceptability of the new testing method among MSM, FSW and VCT clients (AOR of 4.46, 3.19 and 5.74, respectively. Independent predictors of oral fluid HIV rapid testing acceptability among MSM were having ever taken an oral fluid HIV rapid test (AOR= 15.25, having ever taken an HIV test (AOR= 2.07, and education level (AOR= 1.74. Engagement in HIV-related risk behaviors (AOR= 1.68 was an independent predictor of acceptability for FSW. Having taken an HIV test (AOR= 2.85 was an independent predictor of acceptability for VCT clients. The primary concern about the oral fluid HIV testing was accuracy. The median price they would pay for the testing ranged from 4.8 to 8.1 U.S. dollars.High acceptability of oral fluid HIV rapid testing was shown among most-at-risk populations. Findings provide support for oral rapid HIV testing as another HIV prevention tool, and provide a backdrop for the implementation of HIV home testing in the near future. Appropriate pricing and increased public education through awareness campaigns that address concerns about the accuracy and safety of the oral fluid HIV rapid testing may help increase acceptability and use among most-at-risk populations in China.

  12. Project W-320 acceptance test report for AY-farm electrical distribution

    International Nuclear Information System (INIS)

    Bevins, R.R.

    1998-01-01

    This Acceptance Test Procedure (ATP) has been prepared to demonstrate that the AY-Farm Electrical Distribution System functions as required by the design criteria. This test is divided into three parts to support the planned construction schedule; Section 8 tests Mini-Power Pane AY102-PPI and the EES; Section 9 tests the SSS support systems; Section 10 tests the SSS and the Multi-Pak Group Control Panel. This test does not include the operation of end-use components (loads) supplied from the distribution system. Tests of the end-use components (loads) will be performed by other W-320 ATPs

  13. Acceptance Rate of HIV Testing among Women Seeking Induced ...

    African Journals Online (AJOL)

    A l\\'aide d\\'un questionnaire semi-structuré et auto-administré, nous avons interviewé 1051 femmes qui recherchaient l\\'avortement provoqué dans quatre cliniques selectionnées au hazard à Benin City entre janvier et septembre 2002. Les échantillons sanguins de celles qui ont accepté le test du VIH ont été collectés et ont ...

  14. Acceptance Sampling Plans Based on Truncated Life Tests for Sushila Distribution

    Directory of Open Access Journals (Sweden)

    Amer Ibrahim Al-Omari

    2018-03-01

    Full Text Available An acceptance sampling plan problem based on truncated life tests when the lifetime following a Sushila distribution is considered in this paper. For various acceptance numbers, confidence levels and values of the ratio between fixed experiment time and particular mean lifetime, the minimum sample sizes required to ascertain a specified mean life were found. The operating characteristic function values of the suggested sampling plans and the producer’s risk are presented. Some tables are provided and the results are illustrated by an example of a real data set.

  15. Acceptance test report for the 241-SY-101 Flexible Receiver Gamma Detector System

    International Nuclear Information System (INIS)

    Dowell, J.L.

    1995-01-01

    This Acceptance Test Report is for the 241-SY-101 Flexible Receiver Gamma Detector System. This test verified that the data logger and data converter for the gamma detector system functions as intended

  16. Agile Acceptance Test-Driven Development of Clinical Decision Support Advisories: Feasibility of Using Open Source Software.

    Science.gov (United States)

    Basit, Mujeeb A; Baldwin, Krystal L; Kannan, Vaishnavi; Flahaven, Emily L; Parks, Cassandra J; Ott, Jason M; Willett, Duwayne L

    2018-04-13

    Moving to electronic health records (EHRs) confers substantial benefits but risks unintended consequences. Modern EHRs consist of complex software code with extensive local configurability options, which can introduce defects. Defects in clinical decision support (CDS) tools are surprisingly common. Feasible approaches to prevent and detect defects in EHR configuration, including CDS tools, are needed. In complex software systems, use of test-driven development and automated regression testing promotes reliability. Test-driven development encourages modular, testable design and expanding regression test coverage. Automated regression test suites improve software quality, providing a "safety net" for future software modifications. Each automated acceptance test serves multiple purposes, as requirements (prior to build), acceptance testing (on completion of build), regression testing (once live), and "living" design documentation. Rapid-cycle development or "agile" methods are being successfully applied to CDS development. The agile practice of automated test-driven development is not widely adopted, perhaps because most EHR software code is vendor-developed. However, key CDS advisory configuration design decisions and rules stored in the EHR may prove amenable to automated testing as "executable requirements." We aimed to establish feasibility of acceptance test-driven development of clinical decision support advisories in a commonly used EHR, using an open source automated acceptance testing framework (FitNesse). Acceptance tests were initially constructed as spreadsheet tables to facilitate clinical review. Each table specified one aspect of the CDS advisory's expected behavior. Table contents were then imported into a test suite in FitNesse, which queried the EHR database to automate testing. Tests and corresponding CDS configuration were migrated together from the development environment to production, with tests becoming part of the production regression test

  17. The Smart Factory

    DEFF Research Database (Denmark)

    Radziwon, Agnieszka; Bilberg, Arne; Bogers, Marcel

    2014-01-01

    Nowadays we live in a world, which a decade ago would only be described in the science fiction literature. More and more things become smart and both scientists and engineers strive for developing not only new and innovative devices, but also homes, factories, or even cities. Despite of continuous...... development, many of those concepts are still being just a vision of the future, which still needs a lot of effort to become true. This paper reviews the usage of adjective smart in respect to technology and with a special emphasis on the smart factory concept placement among contemporary studies. Due...... to a lack of a consensus of common understanding of this term, a unified definition is proposed. The conceptualization will not only refer to various smart factory visions reported in the literature, but also link the crucial characteristics of this emerging manufacturing concept to usual manufacturing...

  18. Factors predicting the acceptance of herpes simplex virus type 2 antibody testing among adolescents and young adults.

    Science.gov (United States)

    Zimet, Gregory D; Rosenthal, Susan L; Fortenberry, J Dennis; Brady, Rebecca C; Tu, Wanzhu; Wu, Jingwei; Bernstein, David I; Stanberry, Lawrence R; Stone, Katherine M; Leichliter, Jami S; Fife, Kenneth H

    2004-11-01

    The rates and determinants of acceptance of herpes simplex virus type 2 (HSV-2) testing have not been adequately studied. The objective of this study was to identify factors associated with acceptance of HSV-2 antibody testing in individuals with no history of genital herpes. We conducted a cross-sectional survey study followed by the offer of free HSV-2 serologic testing at an urban sexually transmitted disease (STD) clinic, 2 general adult medical clinics, an urban university campus, and an urban adolescent medicine clinic. A total of 1199 individuals aged 14 to 30 years completed the survey and were offered testing. A total of 68.4% accepted HSV-2 testing. Factors independently associated with acceptance were female sex, older age, having an STD history, having 1 or more sexual partners in the last 6 months, perceived vulnerability to HSV-2 infection, and perceived benefits of HSV-2 testing. Fear of needles predicted rejection of testing, as did attending a general medical clinic versus an STD clinic and nonwhite race. There is a substantial interest in HSV-2 antibody testing across a variety of settings. Those at greatest behavioral and historic risk for HSV-2 infection, women, and persons whose health beliefs are consistent with testing are more likely to accept serologic testing when it is offered.

  19. Acceptance Test Report for the high pressure water jet system canister cleaning fixture

    Energy Technology Data Exchange (ETDEWEB)

    Burdin, J.R.

    1995-10-25

    This Acceptance Test confirmed the test results and recommendations, documented in WHC-SD-SNF-DTR-001, Rev. 0 Development Test Report for the High Pressure Water Jet System Nozzles, for decontaminating empty fuel canisters in KE-Basin. Optimum water pressure, water flow rate, nozzle size and overall configuration were tested

  20. Acceptance Test Report for the high pressure water jet system canister cleaning fixture

    International Nuclear Information System (INIS)

    Burdin, J.R.

    1995-01-01

    This Acceptance Test confirmed the test results and recommendations, documented in WHC-SD-SNF-DTR-001, Rev. 0 Development Test Report for the High Pressure Water Jet System Nozzles, for decontaminating empty fuel canisters in KE-Basin. Optimum water pressure, water flow rate, nozzle size and overall configuration were tested

  1. The durability of fired brick incorporating textile factory waste ash and basaltic pumice

    Energy Technology Data Exchange (ETDEWEB)

    Binici, Hanifi [Kahramanmaras Sutcu Imam Univ., Kahramanmaras (Turkey). Dept. of Civil Engineering; Yardim, Yavuz [Epoka Univ., Tirana (Albania). Dept. of Civil Engineering

    2012-07-15

    This study investigates the durability of fired brick produced with additives of textile factories' waste ash and basaltic pumice. The effects of incorporating waste ash and basaltic pumice on durability and mechanical properties of the clay bricks were studied. Samples were produced with different ratios of the textile factories' waste ash and basaltic pumice added and at different fire temperatures of 700, 900, and 1 050 C for 8 h. The bricks with additives were produced by adding equal amounts of textile factories' waste ash and basaltic pumice, separately and together, with rates of 5, 10 and 20 wt.%. The produced samples were kept one year in sodium sulphate and sodium nitrate and tested under freezing - unfreezing and drying - wetting conditions. Then compression strength and mass loss of the samples with and without additives were investigated. The test results were compared with standards and results obtained from control specimens. The results showed that incorporations up to 10 wt.% of textile factories' waste ash and basaltic pumice is beneficial to the fired brick. Both textile factories' waste ash and basaltic pumice were suitable additives and could be used for more durable clay brick production at 900 C fire temperature. (orig.)

  2. Effects of chromium exposure from a cement factory

    International Nuclear Information System (INIS)

    Isikli, B.; Demir, T.A.; Uerer, S.M.; Berber A.; Akar, T.; Kalyoncu, C.

    2003-01-01

    The aim of the study was to determine the chromium concentrations of soil and plant specimens taken from a rural area exposed to cement factory emissions and also to determine the blood concentrations and sensitivity conditions observed in humans residing in this rural area. The study was carried out in Cukurhisar, a town in Eskisehir-Turkey, between May 2000 an March 2001. Besides the 108 soil (36 for control) and plant specimens, which were taken from eight different directions from the cement factory, blood samples of the individuals residing in this area were taken from 258 subject (258 for control) following a physical examination, and patch tests were als applied. The chromium concentrations of the soil and plant specimens take from different places in different directions of the factory were higher than in the control areas. The physical examination of subjects did not reveal results different from those of the control group except for the diagnosis of contact dermatitis. The analyses of venous blood samples showed that chromium concentrations were found to be within the reference values given for bot groups, but higher in the subjects (P<0.001). According to the results o patch tests, sensitivity to chromium was found to be more frequent for the subject group than the control group (P<0.05). According to these results clinical tools revealed no toxic effects for the subjects, except contact dermatitis. However, sensitivity to patch tests showed that this subject group has been affected compared to the control group and that this effect increased with age

  3. Acceptance test report MICON software exhaust fan control modifications; TOPICAL

    International Nuclear Information System (INIS)

    SILVAN, G.R.

    1999-01-01

    This report documents the results the acceptance test HNF-4108 which verifies the MICON program changes for the new automatic transfer switch ATS-2 alarms, the Closed Loop Cooling isolator status, the CB-3 position alarm, the alarms for the new emergency fan damper backup air compressor, and the generator sequencer logic

  4. Enraf series 854 Advanced Technology Gauge (ATG) acceptance test procedure. Revision 3

    International Nuclear Information System (INIS)

    Barnes, G.A.

    1995-01-01

    This procedure provides acceptance testing for Enraf Series 854 level gauges used to monitor levels in Hanford Waste Storage Tanks. The test will verify that the gauge functions according to the manufacturer's instructions and specifications and is properly setup prior to being delivered to the tank farm area

  5. Acceptance test procedure for Project W-049H

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The Acceptance Test Procedure (ATP) program for Project W-049H (200 Area Treated Effluent Disposal Facility [TEDF]) covers three activities as follows: (1) Disposal System; (2) Collection System; and (3) Instrumentation and Control System. Each activity has its own ATP. The purpose of the ATPs is to reverify that the systems have been constructed in accordance with the construction documents and to demonstrate that the systems function as required by the Project criteria. The Disposal System ATP covers the testing of the following: disposal line flowmeters, room air temperatures in the Disposal Station Sampling Building, effluent valves and position indicators, disposal pond level monitors, automated sampler, pressure relief valves, and overflow diversion sluice gates. The Collection System ATP covers the testing of the two pump stations and all equipment installed therein. The Instrumentation and Control (I and C) ATP covers the testing of the entire TEDF I and C system. This includes 3 OCS units, modem, and GPLI cabinets in the ETC control room; 2 pump stations; disposal station sampling building; and all LCUs installed in the field

  6. PCs in the factory

    CERN Document Server

    2013-01-01

    Please note this is a short discount publication.PCs have become as essential to the factory environment as they are to the office environment. This in-depth report examines how specially adapted PCs and peripherals are being established in Factory Process Control and Reporting. The report covers: * Hardware and Software* Typical Applications* Implementation Issues* Case Studies and Real Applications

  7. 26. willingness to accept hiv testing among caretakers with a child

    African Journals Online (AJOL)

    Esem

    women and 11% of men have ever been tested for HIV. With all these efforts in place the .... important strategy in determining the gap in knowledge and its relationship with ... salary, education, and religion to be associated with accepting VCT ...

  8. Project W-049H collection system Acceptance Test Procedure

    International Nuclear Information System (INIS)

    Carrigan, M.C.

    1994-01-01

    The purpose of this Acceptance Test Procedure (ATP) for the Project W-049H, Treated Effluent Disposal Facility, is to verify that the collection system equipment installed as Pump Station No. 1 (225-W) and Pump Station No. 2 (225-E) have been installed in accordance with the design documents and function as required by the project criteria. This will be a wet test with potable water being introduced into the pump pits to test for leakage. Potable water will also be employed in the testing of the pumps and related mechanical equipment. All Instrument and Control equipment related to the pump stations will be checked electronically with simulated inputs/outputs when actual input/output signals are unavailable. Water from Pump Station 1 will be moved through the TEDF piping system and discharged into the disposal ponds. This will check the proper function of the air/vac valves not tested during construction, and the automated samplers

  9. Preserving the Modernist Vertical Urban Factory

    Directory of Open Access Journals (Sweden)

    Nina Rappaport

    2016-07-01

    Full Text Available This essay is adapted in part, from the section, “Modern Factory Architecture” case studies from Nina Rappaport’s book Vertical Urban Factory, published by Actar this spring. Vertical Urban Factory began as an architecture studio, and then an exhibition, which opened in New York in 2011 and traveled to Detroit and Toronto in 2012. Last year the show was displayed at Archizoom at EPFL in Lausanne; Industry City, Brooklyn; and the Charles Moore School of Architecture at Kean University, in New Jersey. The project continues as a think tank evaluating factory futures and urban industrial potential.

  10. Acceptance test procedure for SY Tank Farm replacement exhauster unit

    Energy Technology Data Exchange (ETDEWEB)

    Becken, G.W.

    1994-12-16

    The proper functioning of a new 241-SY Tank Farm replacement exhauster will be acceptance tested, to establish operability and to provide an operational baseline for the equipment. During this test, a verification of all of the alarm and control circuits associated with the exhaust, which provide operating controls and/or signals to local and remote alarm/annunciator panels, shall be performed. Test signals for sensors that provide alarms, warnings, and/or interlocks will be applied to verify that alarm, warning, and interlock setpoints are correct. Alarm and warning lights, controls, and local and remote readouts for the exhauster will be verified to be adequate for proper operation of the exhauster. Testing per this procedure shall be conducted in two phases. The first phase of testing, to verify alarm, warning, and interlock setpoints primarily, will be performed in the MO-566 Fab Shop. The second phase of testing, to verify proper operation and acceptable interface with other tank farm systems, will be conducted after the exhauster and all associated support and monitoring equipment have been installed in the SY Tank Farm. The exhauster, which is mounted on a skid and which will eventually be located in the SY tank farm, receives input signals from a variety of sensors mounted on the skid and associated equipment. These sensors provide information such as: exhauster system inlet vacuum pressure; prefilter and HEPA filter differential pressures; exhaust stack sampler status; exhaust fan status; system status (running/shut down); and radiation monitoring systems status. The output of these sensors is transmitted to the exhauster annunciator panel where the signals are displayed and monitored for out-of-specification conditions.

  11. Neutrino Factory Accelerator R and D: Status and Priorities

    International Nuclear Information System (INIS)

    Zisman, Michael S.

    2005-01-01

    This paper summarizes the status of worldwide Neutrino Factory R and D efforts. Activities are categorized as simulations, component development, and system tests. An indication of R and D tasks that remain to be accomplished is also given

  12. Effects of the Factory Reset on Mobile Devices

    Directory of Open Access Journals (Sweden)

    Riqui Schwamm

    2014-09-01

    Full Text Available Mobile devices usually provide a “factory-reset” tool to erase user-specific data from the main secondary storage. 9 Apple iPhones, 10 Android devices, and 2 BlackBerry devices were tested in the first systematic evaluation of the effectiveness of factory resets. Tests used the Cellebrite UME-36 Pro with the UFED Physical Analyzer, the Bulk Extractor open-source tool, and our own programs for extracting metadata, classifying file paths, and comparing them between images. Two phones were subjected to more detailed analysis. Results showed that many kinds of data were removed by the resets, but much user-specific configuration data was left. Android devices did poorly at removing user documents and media, and occasional surprising user data was left on all devices including photo images, audio, documents, phone numbers, email addresses, geolocation data, configuration data, and keys. A conclusion is that reset devices can still provide some useful information to a forensic investigation.

  13. Experience with High Voltage Tests of the W7-X Magnets in Paschen-Minimum Conditions

    International Nuclear Information System (INIS)

    Petersen-Zarling, B.M.; Risse, K.; Viebke, H.; Gustke, D.; Ehmler, H.; Baldzuhn, J.; Sborchia, C.; Scheller, H.

    2006-01-01

    The W7-X machine is a low-shear stellarator of the Wendelstein line, which is being assembled at the IPP Branch Institute of Greifswald, Germany. The machine features a superconducting magnet system with 50 non-planar and 20 planar magnets operated at about 6 T and discharged with peak voltage levels up to 6 kV. Following the factory tests, the magnets are delivered to CEA Saclay, France, for the final acceptance tests at cryogenic condition. A series of high voltage tests in air and vacuum are part of the final acceptance test. During these tests the quality of the insulation, especially the hand-wrapped ground insulation in the termination area, has proven not to be adequate. In order to improve the reliability of the insulation system and detect defects for early repair, high voltage tests in reduced pressure of air (Paschen-minimum conditions) have been added as part of the factory acceptance procedure. This has been implemented in the vacuum chambers of BNN/Ansaldo for the test of the 50 non-planar coils, while other tests have been carried out at CEA/Saclay after cold testing. IPP has also installed a vacuum tank to perform Paschen tests during the preparation of all the coils for assembly, including also the 20 planar coils which cannot be tested at the manufacturer Tesla. These tests have proven to be a powerful tool to detect hidden insulation defects and void/cavities in the primary impregnation system, which could not be detected otherwise with the standard high voltage tests. This paper will summarize the background and experience accumulated in about 2 years of Paschen tests on the W7-X coils, including a description of the equipment, main results and statistics, weak points detected and repaired on the coils, and possibilities of improvements in the development and production of the W7-X magnets. The importance and the need of Paschen tests as part of the acceptance procedure for superconducting magnets to be used in future projects will also be

  14. 241-AZ-101 Waste Tank Color Video Camera System Shop Acceptance Test Report

    Energy Technology Data Exchange (ETDEWEB)

    WERRY, S.M.

    2000-03-23

    This report includes shop acceptance test results. The test was performed prior to installation at tank AZ-101. Both the camera system and camera purge system were originally sought and procured as a part of initial waste retrieval project W-151.

  15. 241-AZ-101 Waste Tank Color Video Camera System Shop Acceptance Test Report

    International Nuclear Information System (INIS)

    WERRY, S.M.

    2000-01-01

    This report includes shop acceptance test results. The test was performed prior to installation at tank AZ-101. Both the camera system and camera purge system were originally sought and procured as a part of initial waste retrieval project W-151

  16. Rein tension acceptance in young horses in a voluntary test situation.

    Science.gov (United States)

    Christensen, J W; Zharkikh, T L; Antoine, A; Malmkvist, J

    2011-03-01

    During riding, horses are frequently exposed to pressure from the rider, e.g. through the bit and reins, but few studies have investigated at which point rein tension becomes uncomfortable for the horse. To investigate how much rein tension young inexperienced horses are willing to accept in order to obtain a food reward; whether the tension acceptance changes during 3 consecutive test days; and whether rein tension correlates with the expression of conflict behaviour and heart rate. Pressure-naïve horses will apply only little rein tension in the first voluntary trial, but their acceptance will gradually increase. High levels of rein tension will lead to expression of conflict behaviour and increases in heart rate. Fifteen 2-year-old, bridle-naïve mares were encouraged to stretch their head forward (across a 0.95 m high metal bar) to obtain a food reward in a voluntary test situation. On each test day, each horse was exposed to 2 control sessions (loose reins), an intermediate and a short rein session (1 min/session). Rein tension, heart rate and behaviour were recorded. The horses applied significantly more tension on the first day (mean rein tension: 10.2 N), compared to the second and third test day (Day 2: 6.0 and Day 3: 5.7 N). The horses showed significantly more conflict behaviour in the short rein treatment. There was no treatment effect on heart rate. The horses applied the highest rein tension on the first day, and apparently learned to avoid the tension, rather than habituate to it. Rein tension correlated with expression of conflict behaviour, indicating that the horses found the tension aversive. Further studies should focus on the correlation between rein tension and conflict behaviour in ridden horses. © 2010 EVJ Ltd.

  17. Rein tension acceptance in young horses in a voluntary test situation

    DEFF Research Database (Denmark)

    Christensen, Janne Winther; zharkikh, T.L.; Antoine, A.

    2011-01-01

    Reasons for performing the study: During riding, horses are frequently exposed to pressure from the rider, e.g. through the bit and reins, but few studies have investigated at which point rein tension becomes uncomfortable for the horse. Objectives: To investigate how much rein tension young...... inexperienced horses are willing to accept in order to obtain a food reward; whether the tension acceptance changes during 3 consecutive test days; and whether rein tension correlates with the expression of conflict behaviour and heart rate. Hypotheses: Pressure-naïve horses will apply only little rein tension...... in the first voluntary trial, but their acceptance will gradually increase. High levels of rein tension will lead to expression of conflict behaviour and increases in heart rate. Methods: Fifteen 2-year-old, bridle-naïve mares were encouraged to stretch their head forward (across a 0.95 m high metal bar...

  18. Introduction to radiation backgrounds in a B factory

    International Nuclear Information System (INIS)

    Khan, S.

    1992-08-01

    Detector backgrounds in a B factory due to synchrotron radiation and beam-gas interactions are discussed and the computational tools to simulate these processes are outlined. As an example of their application, simulations and beam tests that preceded the installation of the ARGUS silicon vertex detector are described. (orig.)

  19. The development of test software for the inadequate core cooling monitoring system

    International Nuclear Information System (INIS)

    Lee, Soon Sung.

    1996-06-01

    The test software including the ICCMS simulator which is necessary for dynamic test for the ICCMS software in PWR is developed. The developed dynamic test software consists of the module test simulator, the integration test simulator, and the test result analyser. The simulator was programmed by C language according to the same algorithm requirements for the FORTRAN version ICCMS software, and also for the Factory Acceptance Test (FAT). And the simulator can be used as training tool for the reactor operator and system development tool for the performance improvement. (author). 4 tabs., 8 figs., 11 refs

  20. Establishment of a radiotherapy service with a linear accelerator (photons): acceptance tests, dosimetry and quality control

    International Nuclear Information System (INIS)

    Berdaky, Mafalda Feliciano

    2000-01-01

    This work presents the operational part of the final process of the establishment of a radiotherapy service with a linear accelerator (6 MeV photon beams), including the acceptance tests, commissioning tests and the implementation of a quality control program through routine mechanical and radiation tests. All acceptance tests were satisfactory, showing results below the allowed limits of the manufacturer, the commissioning tests presented results within those of the international recommendations. The quality control program was performed during 34 months and showed an excellent stability of this accelerator. (author)

  1. Hanford Immobilized LAW Product Acceptance: Tanks Focus Area Testing Data Package II

    International Nuclear Information System (INIS)

    Schulz, Rebecca L.; Lorier, Troy H.; Peeler, David K.; Brown, Kevin G.; Reamer, Irene A.; Vienna, John D.; Jiricka, Antonin; Jorgensen, Benaiah M.; Smith, Donald E.

    2001-01-01

    This report is a continuation of the Hanford Immobilized Low Activity Waste (LAW) Product Acceptance (HLP): Initial Tanks Focus Area Testing Data Package (Vienna (and others) 2000). In addition to new 5000-h product consistency test (PCT), vapor hydration test (VHT), and alteration products data, some previously reported data together with relevant background information are included for an easily accessible source of reference when comparing the response of the various glasses to different test conditions. A matrix of 55 glasses was developed and tested to identify the impact of glass composition on long-term corrosion behavior and to develop an acceptable composition region for Hanford LAW glasses. Of the 55 glasses, 45 were designed to systematically vary the glass composition, and 10 were selected because large and growing databases on their corrosion characteristics had accumulated. The targeted and measured compositions of these glasses are found in the Appendix A. All glasses were fabricated according to standard procedures and heat treated to simulate the slow cooling that will occur in a portion of the waste glass after vitrification in the planned treatment facility at Hanford

  2. Evaluating outcomes of computer-based classroom testing: Student acceptance and impact on learning and exam performance.

    Science.gov (United States)

    Zheng, Meixun; Bender, Daniel

    2018-03-13

    Computer-based testing (CBT) has made progress in health sciences education. In 2015, the authors led implementation of a CBT system (ExamSoft) at a dental school in the U.S. Guided by the Technology Acceptance Model (TAM), the purposes of this study were to (a) examine dental students' acceptance of ExamSoft; (b) understand factors impacting acceptance; and (c) evaluate the impact of ExamSoft on students' learning and exam performance. Survey and focus group data revealed that ExamSoft was well accepted by students as a testing tool and acknowledged by most for its potential to support learning. Regression analyses showed that perceived ease of use and perceived usefulness of ExamSoft significantly predicted student acceptance. Prior CBT experience and computer skills did not significantly predict acceptance of ExamSoft. Students reported that ExamSoft promoted learning in the first program year, primarily through timely and rich feedback on examination performance. t-Tests yielded mixed results on whether students performed better on computerized or paper examinations. The study contributes to the literature on CBT and the application of the TAM model in health sciences education. Findings also suggest ways in which health sciences institutions can implement CBT to maximize its potential as an assessment and learning tool.

  3. Application of insulin-like growth factor-I and insulin release test in diabetes mellitus

    International Nuclear Information System (INIS)

    Chen Dong; Ma Yongxiu; Duan Wenruo

    2003-01-01

    The purpose of this study was to determine the role of insulin-like growth factor-I (IGF-I) and insulin release test (IRT) in understanding the extent of damage to ability of reducing blood sugar in different types of diabetes mellitus (DM) and in selection of treatment plan and adjustment of using drugs. OGTT, IRT and determination of IGF-I level of 67 normal subjects and 217 DM patients were performed. The result was analyzed comparatively. The level of IGF-I was negatively correlated with the level of fasting blood sugar, and positively correlated with the level of fasting insulin. Our conclusions are: There are two ways of reducing blood sugar: one is by insulin, and the other is by IGF-I. IRT can reflect the former better, and IGF-I the latter. The combination of these two is of significant value in diagnosis and treatment of DM

  4. Colorful Microbial Cell Factories

    DEFF Research Database (Denmark)

    Petersen, Pia Damm

    Yeast cell factories are powerful tools used for the production of high-value natural compounds otherwise not easily available. Many bioactive and industrially important plant secondary metabolites can be produced in yeast by engineering their biosynthetic pathways into yeast cells, as these both...... anthocyanins. Yeast cell factories present a platform to circumvent the problem of low yields of interesting molecular structures in plant tissues, as hand-picking of desired enzyme activities allows for specific biosynthesis of the precise pigment of interest, as well as choosing more stable structures...... for heterologous biosynthesis is possible. In cell factories, great improvements in yields can be achieved through molecular engineering of flux from endogenous yeast precursors, e.g. by elimination of by-product formation, and by genetic optimization of pathway components, such as fine-tuning of expression levels...

  5. Acceptability of self-collected vaginal samples for HPV testing in an ...

    African Journals Online (AJOL)

    Objective: To evaluate the acceptability of self-collected vaginal samples for HPV testing in women living in rural and urban areas of Madagascar. Materials and methods: Participants were recruited in a health care center (urban group) and smaller affiliated dispensaries (rural group). They were invited to perform ...

  6. Acceptance test plan for the Waste Information Control System

    International Nuclear Information System (INIS)

    Flynn, D.F.

    1994-01-01

    This document describes the acceptance test plan for the WICS system. The Westinghouse Hanford Company (WHC) Hazardous Material Control Group (HMC) of the 222-S Laboratory has requested the development of a system to help resolve many of the difficulties associated with tracking and data collection of containers and drums of waste. This system has been identified as Waste Information and Control System (WICS). The request for developing and implementing WICS has been made to the Automation and Simulation Engineering Group (ASE)

  7. Beam position monitoring system for the proposed asymmetric B Factory at SLAC

    International Nuclear Information System (INIS)

    Pellegrin, J.L.

    1992-10-01

    The beam position monitor system of the B Factory is drastically different from the actual PEP system. We present a description of the new configuration and list the features which have been adopted to make this system a highly reliable diagnostic tool. An electrode geometry is suggested, based on the maximum-acceptable power extracted from the beam, and the measurement resolution is estimated by assuming some practical bandwidth and the noise level. Finally, an estimate of the system precision is made by adding up what is expected to be the most significant systematic errors

  8. Evidences of Factorial Structure and Precision of Phonemic Awareness Tasks (TCFe

    Directory of Open Access Journals (Sweden)

    Dalva Maria Alves Godoy

    2015-12-01

    Full Text Available AbstractTo assess phonological awareness - a decisive skill for learning to read and write - it is necessary to provide evidence about an instrument construct to present trustworthy parameters for both empirical research and the development of educational intervention and rehabilitation programs. In Brazil, at this moment, there are no studies regarding the internal structure for tests of phonological awareness. This article shows the factorial validity of a test of phonological awareness composed by three sub-tests: two tasks of subtraction of initial phoneme and one of phonemic segmentation. The multidimensional confirmatory factorial analysis was applied to a sample of 176 Brazilian students ( Mage= 9.3 years from the first to fifth grade of elementary school. Results indicated a well-adjusted model, with items of intermediate difficulty and high factor loadings; thus, this corroboratedthe internal structure and well-designed theoretical conception.

  9. 105 K east ion exchange and cartridge filter restart instrumentation acceptance test report

    International Nuclear Information System (INIS)

    Whitehurst, R.

    1996-01-01

    Acceptance Test Report following the completion of ATP-012 for the 105KE CP-A and CP-A Computer and PLC Panels. The test was conducted from 11/13/95 to 12/11/95. Three test discrepancies were generated during the ATP and all were dispositioned and closed. All sections were completed except Section 5.9 which was deleted per ECN 190556

  10. Delinquency and Peer Acceptance in Adolescence: A Within-Person Test of Moffitt's Hypotheses

    Science.gov (United States)

    Rulison, Kelly L.; Kreager, Derek A.; Osgood, D. Wayne

    2014-01-01

    We tested 2 hypotheses derived from Moffitt's (1993) taxonomic theory of antisocial behavior, both of which are central to her explanation for the rise in delinquency during adolescence. We tested whether persistently delinquent individuals become more accepted by their peers during adolescence and whether individuals who abstain from delinquent…

  11. MAC Version 3.3, MBA Version 1.3 acceptance test summary report

    International Nuclear Information System (INIS)

    Russell, V.K.

    1994-01-01

    The K Basins Materials Accounting (MAC) and Materials Balance (MBA) programs had the Paradox Code Cleanup ATP run to check out the systems. This report describes the results of the test and provides the signoff sheets associated with the testing. The Acceptance Test results indicate that the MAC and MBA systems are ready for operation using the cleaned up code. The final codes were removed to the production space on the customer server on April 15th

  12. Muon Colliders and Neutrino Factories

    Energy Technology Data Exchange (ETDEWEB)

    Kaplan, Daniel M. [IIT, Chicago

    2015-05-29

    Muon colliders and neutrino factories are attractive options for future facilities aimed at achieving the highest lepton-antilepton collision energies and precision measurements of Higgs boson and neutrino mixing matrix parameters. The facility performance and cost depend on how well a beam of muons can be cooled. Recent progress in muon cooling design studies and prototype tests nourishes the hope that such facilities could be built starting in the coming decade. The status of the key technologies and their various demonstration experiments is summarized. Prospects "post-P5" are also discussed.

  13. SatisFactory Final System Evaluation Report

    OpenAIRE

    Sunlight SA

    2018-01-01

    The present document is a deliverable of the SatisFactory project, funded by the European Commission’s Directorate-General for Research and Innovation (DG RTD), under its Horizon 2020 Research and innovation programme (H2020). The main objective of this deliverable is to report on the SatisFactory Final System Evaluation, with regards to the industrial pilots at COMAU and SUNLIGHT. The evaluation of SatisFactory platform is based on the implementation of the business scenarios where each tool...

  14. WQO is Decidable for Factorial Languages

    KAUST Repository

    Atminas, Aistis

    2017-08-08

    A language is factorial if it is closed under taking factors, i.e. contiguous subwords. Every factorial language can be described by an antidictionary, i.e. a minimal set of forbidden factors. We show that the problem of deciding whether a factorial language given by a finite antidictionary is well-quasi-ordered under the factor containment relation can be solved in polynomial time. We also discuss possible ways to extend our solution to permutations and graphs.

  15. Haiti. Educating factory workers.

    Science.gov (United States)

    Hughes, H

    1990-04-01

    There are approximately 50,000 workers employed in the light assembly industry in Haiti. About 70% are women, the majority of whom are aged between 25 and 34 years, and are either single or in a nonpermanent relationship with the father of their children. Many live and work in appalling conditions, surviving on very low wages to support several children and an extended family. The acquired immunodeficiency syndrome (AIDS) is now a visible problem in many factories. In October 1988, the Center for the Promotion of Women Workers (Centre de Promotion des Femmes Ouvriers/CPFO) launched a pilot AIDS education program for factory women. The Center, based in a large industrial zone near the airport, runs a health clinic and courses in literacy, communications skills, health promotion and family planning. The new AIDS program allowed CPFO staff to gain entry into factories for the 1st time. Other courses were held outside working hours and outside factory premises. Staff contacted manages by telephone to arrange a meeting to discuss AIDS and to ask permission to hold educational "round tables" with workers. Of 18 managers in the factories approached over a 12-month period, only 2 refused entry to CPFO staff. Almost all managers reported they had registered between 2 and 5 deaths from AIDS among their employees over the past couple of years. A total of 85 educational sessions, each lasting about 2 hours, were held within 28 different factories, community or labor organizations reaching 3063 workers (male and female). In each session, the presentation was carried out by 2 CPFO trained monitors and included a slide show, flip charts, and the video "Met ko," originally produced for Haitian immigrants in New York. The most important aspect of the program was the training of 38 volunteer factory-based health promoters. These promoters attended the round table sessions, where they facilitated discussion and distributed condoms and were subsequently available for counseling co

  16. Factorial validity of the Utrecht Work Engagement Scale (UWES) across occupational groups in Norway.

    Science.gov (United States)

    Nerstad, Christina G L; Richardsen, Astrid M; Martinussen, Monica

    2010-08-01

    The present study investigated the factorial validity of the Utrecht Work Engagement Scale (UWES) among 1266 participants from ten different occupational groups. Confirmatory factor analyses of the total sample, as well as multi-group analyses and analyses of each of the ten occupational groups separately, indicated that a three-dimensional model of both the UWES-17 and the short version, UWES-9, provided a better fit to the data than a one- and two-dimensional model. The results of multi-group analyses and analyses of each of the groups separately, indicated that with a few exceptions, the three-factor model of work engagement provided the best fit. Results indicated factorial invariance and the internal consistencies were acceptable. The fit of the UWES-9 was slightly better than the UWES-17. It is concluded that the Norwegian short version may be recommended over the UWES-17.

  17. The deformable secondary mirror of VLT: final electro-mechanical and optical acceptance test results

    Science.gov (United States)

    Briguglio, Runa; Biasi, Roberto; Xompero, Marco; Riccardi, Armando; Andrighettoni, Mario; Pescoller, Dietrich; Angerer, Gerald; Gallieni, Daniele; Vernet, Elise; Kolb, Johann; Arsenault, Robin; Madec, Pierre-Yves

    2014-07-01

    The Deformable Secondary Mirror (DSM) for the VLT ended the stand-alone electro-mechanical and optical acceptance process, entering the test phase as part of the Adaptive Optics Facility (AOF) at the ESO Headquarter (Garching). The VLT-DSM currently represents the most advanced already-built large-format deformable mirror with its 1170 voice-coil actuators and its internal metrology based on co-located capacitive sensors to control the shape of the 1.12m-diameter 2mm-thick convex shell. The present paper reports the final results of the electro-mechanical and optical characterization of the DSM executed in a collaborative effort by the DSM manufacturing companies (Microgate s.r.l. and A.D.S. International s.r.l.), INAF-Osservatorio Astrofisico di Arcetri and ESO. The electro-mechanical acceptance tests have been performed in the company premises and their main purpose was the dynamical characterization of the internal control loop response and the calibration of the system data that are needed for its optimization. The optical acceptance tests have been performed at ESO (Garching) using the ASSIST optical test facility. The main purpose of the tests are the characterization of the optical shell flattening residuals, the corresponding calibration of flattening commands, the optical calibration of the capacitive sensors and the optical calibration of the mirror influence functions.

  18. Quality Management Principles as Illustrated by the Organization of Romanian Inter-War Factories. A Century of Romanian Industrial Tradition in Aeronautics

    Directory of Open Access Journals (Sweden)

    Manuela RUSU

    2017-03-01

    Full Text Available Inter-war Romania developed 6 aircraft factories, the first starting its activity in 1916. Four of these, with three located in Bucharest, produced over 2000 aircraft, maily for the military use as Romania entered the Second World War. The activity of these factories was undertaken in times when nobody thought about formulating the principles of quality management and the research of the first scientists in quality, Deming, Shewhart and Juran had not yet been accepted or published. The work aims to present the inter-war Romanian aeronautical industry developments regarding the quality management.

  19. Acceptance testing and quality assurance of Simulix evolution radiotherapy simulator

    International Nuclear Information System (INIS)

    Sinha, Ashutosh; Singh, Navin; Gurjar, Om Prakash; Bagdare, Priyusha

    2015-01-01

    The success of radiotherapy depends on precise treatment simulation and proper patient positioning. The simulator is a conventional radiographic and fluoroscopic system which emulates the geometrical positions of radiotherapy treatment unit. Hence, the acceptance tests and quality assurance (QA) of the simulator are important prior to its commissioning for the safe and precise clinical use. The verification of mechanical and optical readouts, field size, isocenter, optical and radiation field congruence were performed. The X-ray beam parameters were tested for kVp, mAs and consistency of radiation output. The flat panel detector performance was checked with respect to resolution, low contrast sensitivity (LCS), automatic dose rate control (ADRC), and gray image resolution (GIR). Gantry, table, and imaging system collision possibility was checked. Radiation survey around the room was also performed. The field size test for digital readout and on graph paper, the results of isocenter checkup for rotation of gantry, collimator, and couch, and the deviations observed in auto stop for various movements were found within the tolerance limits. Optical field and radiation field was found congruent. All the lasers were found aligned with the established isocenter. Maximum deviation for set and measured kV was found to be 3% in fluoro mode. The maximum deviation observed in mAs was 1.5% in 3-point as well as in 2-point film exposed mode. The X-ray output was found consistent. The results of tests for resolution, LCS, ADRC, and GIR of the flat panel detector were within tolerance limits. All the six safety interlocks were found working. Radiation level around the room was found within the acceptable limits. All the tests carried out were found within the tolerance limits. The data which has been taken in this study will provide basic support to the routine QA of the simulator. (author)

  20. Vacuum system of the high energy ring of an asymmetric B-factory based on PEP

    International Nuclear Information System (INIS)

    Barletta, W.A.; Calderon, M.O.; Wong, R.; Jenkins, T.M.

    1991-01-01

    The multi-ampere currents required for high luminosity operation of an asymmetric B factory leads to extremely stressing requirements on a vacuum system suitable for maintaining long beam-gas lifetimes and acceptable background levels in the detector. We present the design for a Cu alloy vacuum chamber and its associated pumping system for the 9 GeV electron storage ring of the proposed B factory based on PEP. The excellent thermal and photo-desorption properties of Cu allows handling the high proton flux in a conventional, single chamber design with distributed ion pumps. The x-ray opacity of the Cu is sufficiently high that no additional lead shielding is necessary to protect the dipoles from the intense synchrotron radiation generated by the beam. The design allows chamber commissioning in <500 hr of operation. 5 refs., 3 figs., 2 tabs

  1. Internet Factories

    NARCIS (Netherlands)

    Strijkers, R.J.

    2014-01-01

    This thesis contributes a novel concept for introducing new network technologies in network infrastructures. The concept, called Internet factories, describes the methodical process to create and manage application-specific networks from application programs, referred to as Netapps. An Internet

  2. Internet factories

    NARCIS (Netherlands)

    Strijkers, R.J.

    2014-01-01

    This thesis contributes a novel concept for introducing new network technologies in network infrastructures. The concept, called Internet factories, describes the methodical process to create and manage application-specific networks from application programs, referred to as Netapps. An Internet

  3. Baby Factory

    African Journals Online (AJOL)

    Prof

    2018-01-24

    Jan 24, 2018 ... mass media have the power to easily propagate ideas on social change ... issue of 'baby factory' is becoming everyday news affecting the right of ... according to recent mass media reports, teenage girls and young women are.

  4. Multi-Canister Overpack (MCO) Combustible Gas Management Leak Test Acceptance Criteria (OCRWM)

    International Nuclear Information System (INIS)

    SHERRELL, D.L.

    2000-01-01

    The purpose of this document is to support the Spent Nuclear Fuel Project's combustible gas management strategy while avoiding the need to impose any requirements for oxygen free atmospheres within storage tubes that contain multi-canister overpacks (MCO). In order to avoid inerting requirements it is necessary to establish and confirm leak test acceptance criteria for mechanically sealed and weld sealed MCOs that are adequte to ensure that, in the unlikely event the leak test results for any MCO were to approach either of those criteria, it could still be handled and stored in stagnant air without compromising the SNF Project's overall strategy to prevent accumulation of combustible gas mixtures within MCOs or within their surroundings. To support that strategy, this document: (1) establishes combustible gas management functions and minimum functional requirements for the MCO's mechanical seals and closure weld(s); (2) establishes a maximum practical value for the minimum required initial MCO inert backfill gas pressure; and (3) based on items 1 and 2, establishes and confirms leak test acceptance criteria for the MCO's mechanical seal and final closure weld(s)

  5. Nurses' perceptions, acceptance, and use of a novel in-room pediatric ICU technology: testing an expanded technology acceptance model.

    Science.gov (United States)

    Holden, Richard J; Asan, Onur; Wozniak, Erica M; Flynn, Kathryn E; Scanlon, Matthew C

    2016-11-15

    The value of health information technology (IT) ultimately depends on end users accepting and appropriately using it for patient care. This study examined pediatric intensive care unit nurses' perceptions, acceptance, and use of a novel health IT, the Large Customizable Interactive Monitor. An expanded technology acceptance model was tested by applying stepwise linear regression to data from a standardized survey of 167 nurses. Nurses reported low-moderate ratings of the novel IT's ease of use and low to very low ratings of usefulness, social influence, and training. Perceived ease of use, usefulness for patient/family involvement, and usefulness for care delivery were associated with system satisfaction (R 2  = 70%). Perceived usefulness for care delivery and patient/family social influence were associated with intention to use the system (R 2  = 65%). Satisfaction and intention were associated with actual system use (R 2  = 51%). The findings have implications for research, design, implementation, and policies for nursing informatics, particularly novel nursing IT. Several changes are recommended to improve the design and implementation of the studied IT.

  6. Acceptability of rapid oral fluid HIV testing among male injection drug users in Taiwan, 1997 and 2007.

    Science.gov (United States)

    Lyu, Shu-Yu; Morisky, Donald E; Yeh, Ching-Ying; Twu, Shiing-Jer; Peng, Eugene Yu-Chang; Malow, Robert M

    2011-04-01

    Rapid oral fluid HIV testing (rapid oral testing) is in the process of being adapted in Taiwan and elsewhere given its advantages over prior HIV testing methods. To guide this process, we examined the acceptability of rapid oral testing at two time points (i.e., 1997 and 2007) among one of the highest risk populations, male injection drug users (IDUs). For this purpose, an anonymous self-administered survey was completed by HIV-negative IDUs involved in the criminal justice system in 1997 (N (1)=137 parolees) and 2007 (N (2)=106 prisoners). A social marketing model helped guide the design of our questionnaire to assess the acceptability of rapid oral testing. This included assessing a new product, across four marketing dimensions: product, price, promotion, and place. Results revealed that in both 1997 and 2007, over 90% indicated that rapid oral testing would be highly acceptable, particularly if the cost was under US$6, and that a pharmacy would be the most appropriate and accessible venue for selling the rapid oral testing kits. The vast majority of survey respondents believed that the cost of rapid oral testing should be federally subsidized and that television and newspaper advertisements would be the most effective media to advertise for rapid oral testing. Both the 1997 and 2007 surveys suggested that rapid oral HIV testing would be particularly accepted in Taiwan by IDUs after release from the criminal justice system.

  7. Factorial Structure and Preliminary Validation of the Schema Mode Inventory for Eating Disorders (SMI-ED

    Directory of Open Access Journals (Sweden)

    Susan G. Simpson

    2018-04-01

    Full Text Available Objective: The aim of this study was to examine the psychometric properties and factorial structure of the Schema Mode Inventory for Eating Disorders (SMI-ED in a disordered eating population.Method: 573 participants with disordered eating patterns as measured by the Eating Disorder Examination Questionnaire (EDE-Q completed the 190-item adapted version of the Schema Mode Inventory (SMI. The new SMI-ED was developed by clinicians/researchers specializing in the treatment of eating disorders, through combining items from the original SMI with a set of additional questions specifically representative of the eating disorder population. Psychometric testing included Confirmatory Factor Analysis (CFA and internal consistency (Cronbach's α. Multivariate Analyses of Covariance (MANCOVA was also run to test statistical differences between the EDE-Q subscales on the SMI-ED modes, while controlling for possible confounding variables.Results: Factorial analysis confirmed an acceptable 16-related-factors solution for the SMI-ED, thus providing preliminary evidence for the adequate validity of the new measure based on internal structure. Concurrent validity was also established through moderate to high correlations on the modes most relevant to eating disorders with EDE-Q subscales. This study represents the first step in creating a psychometrically sound instrument for measuring schema modes in eating disorders, and provides greater insight into the relevant schema modes within this population.Conclusion: This research represents an important preliminary step toward understanding and labeling the schema mode model for this clinical group. Findings from the psychometric evaluation of SMI-ED suggest that this is a useful tool which may further assist in the measurement and conceptualization of schema modes in this population.

  8. Factorial Structure and Preliminary Validation of the Schema Mode Inventory for Eating Disorders (SMI-ED).

    Science.gov (United States)

    Simpson, Susan G; Pietrabissa, Giada; Rossi, Alessandro; Seychell, Tahnee; Manzoni, Gian Mauro; Munro, Calum; Nesci, Julian B; Castelnuovo, Gianluca

    2018-01-01

    Objective: The aim of this study was to examine the psychometric properties and factorial structure of the Schema Mode Inventory for Eating Disorders (SMI-ED) in a disordered eating population. Method: 573 participants with disordered eating patterns as measured by the Eating Disorder Examination Questionnaire (EDE-Q) completed the 190-item adapted version of the Schema Mode Inventory (SMI). The new SMI-ED was developed by clinicians/researchers specializing in the treatment of eating disorders, through combining items from the original SMI with a set of additional questions specifically representative of the eating disorder population. Psychometric testing included Confirmatory Factor Analysis (CFA) and internal consistency (Cronbach's α). Multivariate Analyses of Covariance (MANCOVA) was also run to test statistical differences between the EDE-Q subscales on the SMI-ED modes, while controlling for possible confounding variables. Results: Factorial analysis confirmed an acceptable 16-related-factors solution for the SMI-ED, thus providing preliminary evidence for the adequate validity of the new measure based on internal structure. Concurrent validity was also established through moderate to high correlations on the modes most relevant to eating disorders with EDE-Q subscales. This study represents the first step in creating a psychometrically sound instrument for measuring schema modes in eating disorders, and provides greater insight into the relevant schema modes within this population. Conclusion: This research represents an important preliminary step toward understanding and labeling the schema mode model for this clinical group. Findings from the psychometric evaluation of SMI-ED suggest that this is a useful tool which may further assist in the measurement and conceptualization of schema modes in this population.

  9. Factorial Structure and Preliminary Validation of the Schema Mode Inventory for Eating Disorders (SMI-ED)

    Science.gov (United States)

    Simpson, Susan G.; Pietrabissa, Giada; Rossi, Alessandro; Seychell, Tahnee; Manzoni, Gian Mauro; Munro, Calum; Nesci, Julian B.; Castelnuovo, Gianluca

    2018-01-01

    Objective: The aim of this study was to examine the psychometric properties and factorial structure of the Schema Mode Inventory for Eating Disorders (SMI-ED) in a disordered eating population. Method: 573 participants with disordered eating patterns as measured by the Eating Disorder Examination Questionnaire (EDE-Q) completed the 190-item adapted version of the Schema Mode Inventory (SMI). The new SMI-ED was developed by clinicians/researchers specializing in the treatment of eating disorders, through combining items from the original SMI with a set of additional questions specifically representative of the eating disorder population. Psychometric testing included Confirmatory Factor Analysis (CFA) and internal consistency (Cronbach's α). Multivariate Analyses of Covariance (MANCOVA) was also run to test statistical differences between the EDE-Q subscales on the SMI-ED modes, while controlling for possible confounding variables. Results: Factorial analysis confirmed an acceptable 16-related-factors solution for the SMI-ED, thus providing preliminary evidence for the adequate validity of the new measure based on internal structure. Concurrent validity was also established through moderate to high correlations on the modes most relevant to eating disorders with EDE-Q subscales. This study represents the first step in creating a psychometrically sound instrument for measuring schema modes in eating disorders, and provides greater insight into the relevant schema modes within this population. Conclusion: This research represents an important preliminary step toward understanding and labeling the schema mode model for this clinical group. Findings from the psychometric evaluation of SMI-ED suggest that this is a useful tool which may further assist in the measurement and conceptualization of schema modes in this population. PMID:29740379

  10. Project W-314 specific test and evaluation plan for 241-AN-A valve pit

    International Nuclear Information System (INIS)

    Hays, W.H.

    1997-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-A Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a ''lower tier'' document based on the W-314 Test and Evaluation Plan (TEP) This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the modifications of the AN-A valve pit. The Project Design Specifications (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the modifications to the 241-AN-A Valve Pit. The STEP will be utilized in conjunction with the TEP for verification and validation

  11. Phi factories

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    Plans for 'phi factories' gathered momentum with a recent workshop at UCLA. These machines, high luminosity electron-positron colliders working near the phi resonance at 1020 MeV, have been proposed at Laboratories in Europe, the US, Japan and the USSR

  12. Smart Factory

    DEFF Research Database (Denmark)

    Bilberg, Arne; Radziwon, Agnieszka; Grube Hansen, David

    2017-01-01

    their innovation and competitive advantage by focusing at their competences, strengths and opportunities. The project suggests innovative solutions and business models through collaboration and use of new technologies. In the Smart Factory, SMEs should be able to collaborate on new products, markets and production......, and to target their challenges and ensure sustainable growth and business in these enterprises. Therefore the focus of the Smart Factory project was to support the growth and sustainable development of the small and medium sized manufacturing industry in Denmark. The project focused on SMEs and how to improve......A large part of Danish Industry is based on Small and Medium Sized Enterprises (SMEs), which account for –99% of the companies in Denmark and about two third of the job positions (source: statistikbanken.dk) . That is why, it is so important also to focus research and development at SMEs...

  13. Consumer acceptance, market test and market development of irradiated rice, dehydrated vegetables and spices

    International Nuclear Information System (INIS)

    Shi Peixin; Lin Yin

    2001-01-01

    Establishment of irradiation processing parameters, a quality assurance system, consumer acceptance, market test and market development of irradiated rice, dehydrated vegetables and spices were the activities carried out in this project by the Chinese Agricultural Irradiation Center. The results of the studies showed that the process dose for rice was 0.2-0.5 kGy when the non-uniformity was lower than 2.5, dose range for dehydrated vegetables was 5-7 kGy, dose for spices was 7-8 kGy. The system for quality assurance was established. The processing standards for several irradiated food items were set up. Market test showed that more than 70-80% of consumers accepted irradiated food. Industrial companies also accepted irradiated dehydrated vegetables and spices. The latter were successfully introduced to the markets and successful commercialization of irradiated garlic was followed. The economic benefit of operating the Chinese Agricultural Irradiation Center was analyzed and found attractive, especially for low dose irradiation of foods in sufficient supply. (author)

  14. Consumer acceptance, market test and market development of irradiated rice, dehydrated vegetables and spices

    Energy Technology Data Exchange (ETDEWEB)

    Peixin, Shi; Yin, Lin [Chinese Agricultural Irradiation Center, Institute for Application of Atomic Energy, Chinese Academy of Agricultural Sciences, Beijing (China)

    2001-05-01

    Establishment of irradiation processing parameters, a quality assurance system, consumer acceptance, market test and market development of irradiated rice, dehydrated vegetables and spices were the activities carried out in this project by the Chinese Agricultural Irradiation Center. The results of the studies showed that the process dose for rice was 0.2-0.5 kGy when the non-uniformity was lower than 2.5, dose range for dehydrated vegetables was 5-7 kGy, dose for spices was 7-8 kGy. The system for quality assurance was established. The processing standards for several irradiated food items were set up. Market test showed that more than 70-80% of consumers accepted irradiated food. Industrial companies also accepted irradiated dehydrated vegetables and spices. The latter were successfully introduced to the markets and successful commercialization of irradiated garlic was followed. The economic benefit of operating the Chinese Agricultural Irradiation Center was analyzed and found attractive, especially for low dose irradiation of foods in sufficient supply. (author)

  15. Vacuum Acceptance Tests for the UHV Room Temperature Vacuum System of the LHC during LS1

    CERN Document Server

    Cattenoz, G; Bregliozzi, G; Calegari, D; Gallagher, J; Marraffa, A; Chiggiato, P

    2014-01-01

    During the CERN Large Hadron Collider (LHC) first long shut down (LS1), a large number of vacuum tests are carried out on consolidated or newly fabricated devices. In such a way, the vacuum compatibility is assessed before installation in the UHV system of the LHC. According to the equipment’s nature, the vacuum acceptance tests consist in functional checks, leak test, outgassing rate measurements, evaluation of contaminants by Residual Gas Analysis (RGA), pumping speed measurements and qualification of the H2 sticking probability of Non-Evaporable-Getter (NEG) coating. In this paper, the methods used for the tests and the acceptance criteria are described. A summary of the measured vacuum characteristics for the tested components is also given.

  16. Determinants of the Acceptance of Sustainable Production Strategies among Dairy Farmers: Development and Testing of a Modified Technology Acceptance Model

    Directory of Open Access Journals (Sweden)

    Simona Naspetti

    2017-10-01

    Full Text Available An extended version of the Technology Acceptance Model (TAM was applied by means of Structural Equation Modelling to testing various hypotheses on attitudes and intentions of dairy farmers towards three novel sustainable production strategies, as well as the influence of organic practices and collaborative behaviours, such as information sharing with supply-chain partners. Data on the acceptance of three sustainable production strategies, namely ‘Agro-forestry’, ‘Alternative protein source’, and ‘Prolonged maternal feeding’ were collected by a survey of dairy farmers in six European Union (EU countries (Austria, Belgium, Denmark, Finland, Italy, United Kingdom. We found that perceived usefulness is the key determinant of acceptance, while the intention to adopt a sustainable production strategy may derive from the influence of opinions (and behaviours of relevant others (e.g., leading dairy farmers, family members, advisors showing the role of interactions among farmers and other stakeholders in the adoption of innovations. Finally, the perceived usefulness of all of the investigated strategies is higher for organic farmers, while collaborative patterns reduce the impact of subjective norm on usefulness and overall acceptance. Our findings should encourage policy makers to consider the important role of supply chain management practices, including collaboration, to enhance the sustainability of dairy farming systems.

  17. Information-Processing Architectures in Multidimensional Classification: A Validation Test of the Systems Factorial Technology

    Science.gov (United States)

    Fific, Mario; Nosofsky, Robert M.; Townsend, James T.

    2008-01-01

    A growing methodology, known as the systems factorial technology (SFT), is being developed to diagnose the types of information-processing architectures (serial, parallel, or coactive) and stopping rules (exhaustive or self-terminating) that operate in tasks of multidimensional perception. Whereas most previous applications of SFT have been in…

  18. SEARCH FOR NEW PHYSICS AT A SUPER-B FACTORY.

    Energy Technology Data Exchange (ETDEWEB)

    BROWDER,T.E.; SONI,A.

    2004-01-05

    The importance of a Super-B Factory in the search for New Physics, in particular, due to CP-od phase(s) from physics beyond the Standard Model is surveyed. The first point to emphasize is that we know now how to directly measure all three angles of the unitarity triangle very cleanly, i. e. without theoretical assumptions with irreducible theory error {le} 1%; however this requires much more luminosity than is currently available at B-factories. Direct searches via penguin-dominated hadronic modes as well as radiative, pair-leptonic and semi-leptonic decays are also discussed. Null tests of the SM are stressed as these will play a crucial role especially if the effects of BSM phase(s) on B-physics are small.

  19. Factorials of real negative and imaginary numbers - A new perspective.

    Science.gov (United States)

    Thukral, Ashwani K

    2014-01-01

    Presently, factorials of real negative numbers and imaginary numbers, except for zero and negative integers are interpolated using the Euler's gamma function. In the present paper, the concept of factorials has been generalised as applicable to real and imaginary numbers, and multifactorials. New functions based on Euler's factorial function have been proposed for the factorials of real negative and imaginary numbers. As per the present concept, the factorials of real negative numbers, are complex numbers. The factorials of real negative integers have their imaginary part equal to zero, thus are real numbers. Similarly, the factorials of imaginary numbers are complex numbers. The moduli of the complex factorials of real negative numbers, and imaginary numbers are equal to their respective real positive number factorials. Fractional factorials and multifactorials have been defined in a new perspective. The proposed concept has also been extended to Euler's gamma function for real negative numbers and imaginary numbers, and beta function.

  20. The Tau-Charm Factory in the ERA of B-Factories and CESR

    International Nuclear Information System (INIS)

    Beers, L.V.; Perl, M.L.

    1994-10-01

    This paper is a collection of presentations made at a conference on tau-charm factories, held at the Stanford Linear Accelerator Center and Stanford University on August 15-16, 1994. The papers presented summarize the physics which can be learned from such a facility, the advantages it would present over planned B-factories and large centers such as CESR, and the types of decay modes which could be observed. More detailed studies of tau physics are opened up, as well as charmonium and charmed systems. Seperate presentations to the proceedings are indexed individually into the database

  1. The Low-Energy Neutrino Factory

    International Nuclear Information System (INIS)

    Brass, Alan; Geer, Steve; Ellis, Malcolm; Mena, Olga; Pascoli, Silvia

    2008-01-01

    To date most studies of Neutrino Factories have focused on facilities where the energy of the muon in the storage ring has been in the range of 25-50 GeV. In this paper we present a concept for a Low-Energy (∼ 4 GeV) neutrino factory. For baselines of O(1000 km), the rich oscillation pattern at low neutrino interaction energy (0.5 - ∼3 GeV) provides the unique performance of this facility with regard to its sensitivity to CP violation and the determination of the neutrino mass hierarchy. A unique neutrino detector is needed, however, in order to exploit this oscillation pattern. We will describe the basic accelerator facility, demonstrate the methodology of the analysis and give an estimate on how well the Low-Energy neutrino factory can measure θ 13 , CP violation and the mass hierarchy. We will also describe the detector concept that is used, show a preliminary analysis regarding its performance and indicate what R and D is still needed. Finally we will show how the Low-Energy neutrino factory could be a step towards an energy frontier muon collider.

  2. The Energy Factory; EnergieFabriek

    Energy Technology Data Exchange (ETDEWEB)

    Van den Boomen, M.; Van den Dungen, G.J.; Elias, T.; Jansen, M. [Universiteit van Amsterdam UvA, Amsterdam (Netherlands)

    2009-05-15

    The Energy Factory is a collaboration of 26 Dutch local water boards in which options for energy saving and energy production are examined. According to the authors, the initiative of the Energy Factory will lead to a reframing of the role of the water boards. Moreover, they explain how the PPP concept (People, Planet, Profit) may act as platform for negotiations between actors who are involved in the Energy Factory. In addition, the PPP concept is used to demonstrate that the Energy Factory will lead to larger social involvement, social entrepreneurship and growing profits [Dutch] De Energiefabriek is een samenwerkingsverband van 26 waterschappen in Nederland waarin wordt gezocht naar mogelijkheden om energie te besparen en zelf energie te produceren. Volgens de auteurs van deze notitie leidt het initiatief van de Energiefabriek tot een reframing van de rol van waterschappen. Daarnaast leggen ze uit hoe het PPP-concept (People, Profit, Planet) kan fungeren als platform voor onderhandelingen tussen de actoren die betrokken zijn bij de Energiefabriek. Verder wordt met het PPP-concept aangetoond dat de Energiefabriek leidt tot ruimere maatschappelijke betrokkenheid, maatschappelijk ondernemen en winstvergroting.

  3. Information Management for Factory Planning and Design

    OpenAIRE

    Chen, Danfang

    2012-01-01

    This thesis is dedicated to the manufacturing industry for the improvement of information management within the factory planningand design domain, and for more efficient factory planning and design. Currently the manufacturing industry lacks sufficient methods for capturing, structuring, and representing information and knowledge for easy access, exchange, integration and reuse within the domain. Therefore the focus of this thesis is on information and knowledge management within factory plan...

  4. Virtual Factory Testbed

    Data.gov (United States)

    Federal Laboratory Consortium — The Virtual Factory Testbed (VFT) is comprised of three physical facilities linked by a standalone network (VFNet). The three facilities are the Smart and Wireless...

  5. Photon factory activity report, 1993

    International Nuclear Information System (INIS)

    1994-01-01

    This issue is the annual report of the Photon Factory, National Laboratory of High Energy Physics. First the outline of the Photon Factory is presented. Injector linac, light source, beamlines and instrumentation, synchrotron radiation facility at the Tristan accumulation ring, and the Tristan super light facility are described in detail. The facility is open to researchers. The user's reports are collected as well. (J.P.N.)

  6. General B factory design considerations

    International Nuclear Information System (INIS)

    Zisman, M.S.

    1992-12-01

    We describe the general considerations that go into the design of an asymmetric B factory collider. Justification is given for the typical parameters of such a facility, and the physics and technology challenges that arise from these parameter choices are discussed. Cost and schedule issues for a B factory are discussed briefly. A summary of existing proposals is presented, noting their similarities and differences

  7. STANFORD (SLAC): B factory construction begins

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1994-03-15

    At a ceremony marking the start of construction, members of the US Congress and Secretary of Energy Hazel O'Leary hailed the new Asymmetric B Factory as the key to continued vitality of the Stanford Linear Accelerator Center (SLAC). Being built in collaboration with the Lawrence Berkeley Laboratory and the Lawrence Livermore National Laboratory, the B factory is a $177 million upgrade of the existing PEP electron-positron collider. Scheduled for completion in 1998, the B factory will generate many millions of B mesons, allowing, among other physics, an intensive search for the phenomena of CP violation in the decays of these particles.

  8. Deficits and Solutions in the Development of Modular Factory Systems

    OpenAIRE

    Achim Kampker; Peter Burggräf; Moritz Krunke; Hanno Voet

    2017-01-01

    As a reaction to current challenges in factory planning, many companies think about introducing factory standards to lower planning times and decrease planning costs. If these factory standards are set-up with a high level of modularity, they are defined as modular factory systems. This paper deals with the main current problems in the application of modular factory systems in practice and presents a solution approach with its basic models. The methodology is based on methods from factory pla...

  9. Integrating Telemedicine for Disaster Response: Testing the Emergency Telemedicine Technology Acceptance Model

    Science.gov (United States)

    Davis, Theresa M.

    2013-01-01

    Background: There is little evidence that technology acceptance is well understood in healthcare. The hospital environment is complex and dynamic creating a challenge when new technology is introduced because it impacts current processes and workflows which can significantly affect patient care delivery and outcomes. This study tested the effect…

  10. Psychological, situational and application-related determinants of the intention to self-test: a factorial survey among students.

    Science.gov (United States)

    Kuecuekbalaban, Pinar; Rostalski, Tim; Schmidt, Silke; Muehlan, Holger

    2017-07-10

    The Internet enables an unprecedented opportunity to access a broad range of self-tests (e.g. testing for HIV, cancer, hepatitis B/C), which can be conducted by lay consumers without the help of a health professional. However, there is only little knowledge about the determinants of the use of self-tests. Thus, the aims of this study were (1) to experimentally investigate the impact of situational and application-related characteristics on the intention to use a self-test (ST), compared to being tested by a health professional at home (HPH) or at a doctor's office (HPD), (2) to examine the applicability of social-cognitive health behaviour theories on self-testing, and (3) to explore the advantages of integrating technological affinity into social-cognitive health behaviour models to predict self-testing. In a factorial survey, 1248 vignettes were rated by 208 students. The core concepts of social-cognitive health behaviour theories, technological affinity, and different situational and application-related characteristics were investigated. Intention to ST was only predicted by the medical expertise of the tested person, while HPH and HPD were also associated with the application purpose of the test and the presence of an emotionally supporting person. Perceived severity and outcome-expectancy significantly predicted intention to self-test. Technological enthusiastic people had a higher intention to use a self-test. Intention to ST, HPH and HPD were predicted by different situational and application-related characteristics. Social-cognitive health behaviour theories can be applied to predict self-testing and do not need to be extended by technological affinity.

  11. Cassini RTG acceptance test results and RTG performance on Galileo and Ulysses

    International Nuclear Information System (INIS)

    Kelly, C.E.; Klee, P.M.

    1997-01-01

    Flight acceptance testing has been completed for the RTGs to be used on the Cassini spacecraft which is scheduled for an October 6, 1997 launch to Saturn. The acceptance test program includes vibration tests, magnetic field measurements, properties (weight and c.g.) and thermal vacuum test. This paper presents The thermal vacuum test results. Three RTGs are to be used, F-2, F-6, and F-7. F-5 is tile back-up RTG, as it was for the Galileo and Ulysses missions launched in 1989 and 1990, respectively. RTG performance measured during the thermal vacuum tests carried out at die Mound Laboratory facility met all specification requirements. Beginning of mission (BOM) and end of mission (EOM) power predictions have been made based on than tests results. BOM power is predicted to be 888 watts compared to the minimum requirement of 826 watts. Degradation models predict the EOM power after 16 years is to be 640 watts compared to a minimum requirement of 596 watts. Results of small scale module tests are also showing. The modules contain couples from the qualification and flight production runs. The tests have exceeded 28,000 hours (3.2 years) and are continuing to provide increased confidence in the predicted long term performance of the Cassini RTGs. All test results indicate that the power requirements of the Cassini spacecraft will be met. BOM and EOM power margins of over five percent are predicted. Power output from telemetry for the two Galileo RTGs are shown from the 1989 launch to the recent Jupiter encounter. Comparisons of predicted, measured and required performance are shown. Telemetry data are also shown for the RTG on the Ulysses spacecraft which completed its planned mission in 1995 and is now in the extended mission

  12. Cassini RTG acceptance test results and RTG performance on Galileo and Ulysses

    International Nuclear Information System (INIS)

    Kelly, C.E.; Klee, P.M.

    1997-01-01

    Flight acceptance testing has been completed for the RTGs to be used on the Cassini spacecraft which is scheduled for an October 6, 1997 launch to Saturn. The acceptance test program includes vibration tests, magnetic field measurements, mass properties (weight and c.g.) and thermal vacuum test. This paper presents the thermal vacuum test results. Three RTGs are to be used, F-2, F-6, and F-7. F-5 is the backup RTG, as it was for the Galileo and Ulysses missions launched in 1989 and 1990, respectively. RTG performance measured during the thermal vacuum tests carried out at the Mound Laboratory facility met all specification requirements. Beginning of mission (BOM) and end of mission (EOM) power predictions have been made based on these tests results. BOM power is predicted to be 888 watts compared to the minimum requirement of 826 watts. Degradation models predict the EOM power after 16 years is to be 640 watts compared to a minimum requirement of 596 watts. Results of small scale module tests are also shown. The modules contain couples from the qualification and flight production runs. The tests have exceeded 28,000 hours (3.2 years) and are continuing to provide increased confidence in the predicted long term performance of the Cassini RTGs. All test results indicate that the power requirements of the Cassini spacecraft will be met. BOM and EOM power margins of over 5% are predicted. Power output from telemetry for the two Galileo RTGs are shown from the 1989 launch to the recent Jupiter encounter. Comparisons of predicted, measured and required performance are shown. Telemetry data are also shown for the RTG on the Ulysses spacecraft which completed its planned mission in 1995 and is now in the extended mission

  13. Neutrino Factory: status and prospects

    International Nuclear Information System (INIS)

    Long, K.

    2011-01-01

    The properties of the neutrino provide a unique window on physics beyond that described by the Standard Model. The study of sub-leading effects in neutrino oscillations has begun with the race to measure θ 13 consensus is emerging within the international community that a novel neutrino source is required to allow sensitive searches for leptonic CP violation to be carried out and the neutrino mass-hierarchy to be determined. The Neutrino Factory, in which intense neutrino beams are produced from the decay of muons, has been shown to out-perform the other proposed facilities. The physics case for the Neutrino Factory will be reviewed and the baseline design of the facility being developed by the International Design Study for the Neutrino Factory (the IDS-NF) collaboration will be described.

  14. Steps towards the Neutrino Factory

    International Nuclear Information System (INIS)

    Long, K.

    2012-01-01

    The properties of the neutrino provide a unique window on physics beyond that described by the Standard Model. The study of sub-leading effects in neutrino oscillations has begun with the race to measure θ 13 . A consensus is emerging within the international community that a novel neutrino source is required to allow sensitive searches for leptonic CP violation to be carried out and the neutrino mass-hierarchy to be determined. The Neutrino Factory, in which intense neutrino beams are produced from the decay of muons, has been shown to out-perform the other proposed facilities. The physics case for the Neutrino Factory will be reviewed and the baseline design of the facility being developed by the International Design Study for the Neutrino Factory (the IDS-NF) collaboration will be described.

  15. Acceptability of Sexually Transmitted Infection Testing Using Self-Collected Vaginal Swabs among College Women

    Science.gov (United States)

    Fielder, Robyn L.; Carey, Kate B.; Carey, Michael P.

    2013-01-01

    Objective: To assess the acceptability of sexually transmitted infection (STI) testing using self-collected vaginal swabs (SCVS) among college women. Participants: First-year female students ("N" = 483). Methods: Participants were offered free testing for 3 STIs using SCVS in April 2010 and later completed a survey regarding their…

  16. Computer-facilitated rapid HIV testing in emergency care settings: provider and patient usability and acceptability.

    Science.gov (United States)

    Spielberg, Freya; Kurth, Ann E; Severynen, Anneleen; Hsieh, Yu-Hsiang; Moring-Parris, Daniel; Mackenzie, Sara; Rothman, Richard

    2011-06-01

    Providers in emergency care settings (ECSs) often face barriers to expanded HIV testing. We undertook formative research to understand the potential utility of a computer tool, "CARE," to facilitate rapid HIV testing in ECSs. Computer tool usability and acceptability were assessed among 35 adult patients, and provider focus groups were held, in two ECSs in Washington State and Maryland. The computer tool was usable by patients of varying computer literacy. Patients appreciated the tool's privacy and lack of judgment and their ability to reflect on HIV risks and create risk reduction plans. Staff voiced concerns regarding ECS-based HIV testing generally, including resources for follow-up of newly diagnosed people. Computer-delivered HIV testing support was acceptable and usable among low-literacy populations in two ECSs. Such tools may help circumvent some practical barriers associated with routine HIV testing in busy settings though linkages to care will still be needed.

  17. Topographical mapping system for radiological and hazardous environments acceptance testing

    International Nuclear Information System (INIS)

    Armstrong, G.A.; Dochat, G.R.

    1997-01-01

    During the summer of 1996, the Topographical Mapping System (TMS) for hazardous and radiological environments and its accompanying three-dimensional (3-D) visualization tool, the Interactive Computer-Enhanced Remote-Viewing System (ICERVS), were delivered to Oak Ridge National Laboratory (ORNL). ORNL and Mechanical Technology, Inc., performed final acceptance testing of the TMS during the next eight months. The TMS was calibrated and characterized during this period. This paper covers the calibration, characterization, and acceptance testing of the TMS. Development of the TMS and ICERVS was initiated by the US Department of Energy (DOE) for the purpose of characterization and remediation of underground storage tanks (USTs) at DOE sites across the country. DOE required a 3-D, topographical mapping system suitable for use in hazardous and radiological environments. The intended application is the mapping of the interior of USTs as part of DOE's waste characterization and remediation efforts and to obtain baseline data on the content of the storage tank interiors as well as data on changes in the tank contents and levels brought about by waste remediation steps. Initially targeted for deployment at the Hanford Washington site, the TMS is designed to be a self-contained, compact, and reconfigurable system that is capable of providing rapid, variable-resolution mapping information in poorly characterized workspaces with a minimum of operator intervention

  18. Topographical mapping system for radiological and hazardous environments acceptance testing

    Science.gov (United States)

    Armstrong, Gary A.; Dochat, G. R.

    1997-09-01

    During the summer of 1996, the topographical mapping system (TMS) for hazardous and radiological environments and its accompanying three-dimensional (3-D) visualization tool, the interactive computer-enhanced remote-viewing system (ICERVS), were delivered to Oak Ridge National Laboratory (ORNL). ORNL and Mechanical Technology, Inc., performed final acceptance testing of the TMS during the next eight months. The TMS was calibrated and characterized during this period. This paper covers the calibration, characterization, and acceptance testing of the TMS. Development of the TMS and the ICERVS was initiated by the U.S. Department of Energy (DOE) for the purpose of characterization and remediation of underground storage tanks (USTs) at DOE sites across the country. DOE required a 3-D, topographical mapping system suitable for use in hazardous and radiological environments. The intended application is the mapping of the interior of USTs as part of DOE's waste characterization and remediation efforts and to obtain baseline data on the content of the storage tank interiors as well as data on changes in the tank contents and levels brought about by waste remediation steps. Initially targeted for deployment at the Hanford Washington site, the TMS is designed to be a self-contained, compact, reconfigurable system that is capable of providing rapid, variable-resolution mapping information in poorly characterized workspaces with a minimum of operator intervention.

  19. Factorial and construct validity of Portuguese version (Brazil Bergen Facebook Addiction Scale

    Directory of Open Access Journals (Sweden)

    Hugo Rafael de Souza e Silva

    Full Text Available ABSTRACT Objective To evaluate factorial and construct validity of the Brazilian Portuguese version of the Bergen Facebook Addiction Scale (BFAS-BR. Methods A sociodemographic questionnaire, the Brazilian Portuguese versions of Online Cognition Scale (OCS-BR and of BFAS-BR were applied to a sample of Health Undergraduate (n = 356. Construct validity evidences were verified through the Confirmatory Factor Analysis. Discriminant validity was examined by correlational analysis between the version of the BFAS-BR and OCS-BR. Results Proposed factorial model of BFAS did not present a good quality adjustment. So, a model restructuring was necessary from behavioral addiction theoretical views and new model presented satisfactory adjustment quality and construct validity evidence. Correlation between both tested scales was strong (ρ = 0.707 and, therefore, they measure the same construct. Conclusion The BFAS-BR show adequate factorial and construct validity.

  20. The factorial structure of professionally-applied physical fitness of students of railway specialties

    Directory of Open Access Journals (Sweden)

    Anzhelika Yefremova

    2017-02-01

    Full Text Available Purpose: to define the factorial structure of professionally-applied physical fitness of students – future electrical engineers of railway transport. Material & Methods: analysis and synthesis of references, questioning, anthropometry, testing, functional tests, and methods of mathematical statistics (the factorial analysis with application of the computer program "SPSS 17.0". 50 students (young men of Ukrainian state railway university participated in the research. Results: the ratio of means of physical culture which are expedient to use for the optimization of professionally-applied physical training of future specialists of the railway branch is defined. Conclusions: the factorial analysis allowed to distribute means of physical education as follows: physical exercises which are directed to the increase in physical working capacity and overall physical fitness – about 40%; exercises on the development of power qualities – 25%; exercises on the development of high-speed and power endurance – 15%; means which are allocated for the improvement of functions of attention and kinetic sensitivity – 10%; exercises which are directed to the increase in special working capacity – 10%.

  1. Who accepts a rapid HIV antibody test? The role of race/ethnicity and HIV risk behavior among community adolescents.

    Science.gov (United States)

    Swenson, Rebecca R; Hadley, Wendy S; Houck, Christopher D; Dance, S Kwame; Brown, Larry K

    2011-05-01

    Centers for Disease Control and Prevention guidelines recommend routine human immunodeficiency virus (HIV) screening in health care settings for all individuals aged 13-64 years; however, overall testing rates among adolescents still continue to remain low. This study examined factors related to the acceptance of HIV testing among an at-risk sample of ethnically/racially diverse community adolescents. Adolescents aged 15-21 (N = 81) years were recruited from community-based youth organizations to complete HIV risk assessment surveys. After the completion of the survey, participants were offered a free OraQuick rapid HIV antibody test. More than half (53.1%) of the participants accepted the test, with the black population being more likely to accept testing as compared to Latinos (75% vs. 39%). After controlling for race/ethnicity, significant predictors of test acceptance included history of sexual intercourse (OR = 5.43), having only one sexual partner in the past 3 months (OR = 4.88), not always using a condom with a serious partner (OR = 3.94), and not using a condom during last sexual encounter (OR = 4.75). Given that many adolescents are willing to know their HIV status, policies that support free or low-cost routine testing may lead to higher rates of case identification among youth. However, approaches must be developed to increase test acceptance among Latino adolescents and teenagers with multiple sexual partners. Copyright © 2011 Society for Adolescent Health and Medicine. Published by Elsevier Inc. All rights reserved.

  2. Quality assurance in diagnostic radiology in Hungary - first experiences in acceptance testing

    International Nuclear Information System (INIS)

    Porubszky, T.; Pellet, S.; Ballay, L.; Talian, L.; Giczi, F.

    2003-01-01

    It is a general experience that optimum imaging with minimum patient doses, moreover, the safe operation and long life of X-ray equipment can be assured by regular measurement of technical parameters and checking of their constancy (routine performance testing) only. These tests are generally known as quality control, while together with the so-called corrective actions and its management it is called (physical-technical) quality assurance (QA). In the European Union, Directive 97/43/EURATOM about radiation protection of patients requires - among others - the good practice of (physical-technical) quality assurance. In Hungary, Decree No. 31/2001. (X.3.) of the Minister of Health harmonizes all of its requirements. Acceptance testing of new diagnostic X-ray equipment is assigned to NPHC-NRIRR. QA has been a daily practice in radiation therapy and nuclear medicine for a long time. A National Patient Dose Assessment Programme has also successfully run since 1989. We had, however, only few preliminaries in QA in diagnostic radiology in the second half of the eighties. Nowadays there are running QA programmes in some hospitals and mammography centres. he testing activity of our institute is independent from manufacturers, it is run within the frame of an accredited testing laboratory, using calibrated measuring instruments and based on valid international standards. So the started way of implementing QA in diagnostic radiology needs a lot of further efforts, adapting experiences of other countries, and also some financial help to reach an acceptable level in the EU. (authors)

  3. Photon factory activity report, 1992

    International Nuclear Information System (INIS)

    1993-01-01

    This issue is the annual report of the Photon Factory, National laboratory of High Energy Physics. First, the outline of the Photon Factory is presented. Injector linac, light source, beamlines and instrumentation, the Tristan synchrotron radiation facility at the accumulation ring, and the Tristan super light facility are described in detail. The facility is open to researchers. The user's reports are collected as well. (J.P.N.) (435 refs.)

  4. Muon colliders and neutrino factories

    Energy Technology Data Exchange (ETDEWEB)

    Geer, S.; /Fermilab

    2010-09-01

    Over the last decade there has been significant progress in developing the concepts and technologies needed to produce, capture and accelerate {Omicron}(10{sup 21}) muons/year. This development prepares the way for a new type of neutrino source (Neutrino Factory) and a new type of very high energy lepton-antilepton collider (Muon Collider). This article reviews the motivation, design and R&D for Neutrino Factories and Muon Colliders.

  5. Rank-based permutation approaches for non-parametric factorial designs.

    Science.gov (United States)

    Umlauft, Maria; Konietschke, Frank; Pauly, Markus

    2017-11-01

    Inference methods for null hypotheses formulated in terms of distribution functions in general non-parametric factorial designs are studied. The methods can be applied to continuous, ordinal or even ordered categorical data in a unified way, and are based only on ranks. In this set-up Wald-type statistics and ANOVA-type statistics are the current state of the art. The first method is asymptotically exact but a rather liberal statistical testing procedure for small to moderate sample size, while the latter is only an approximation which does not possess the correct asymptotic α level under the null. To bridge these gaps, a novel permutation approach is proposed which can be seen as a flexible generalization of the Kruskal-Wallis test to all kinds of factorial designs with independent observations. It is proven that the permutation principle is asymptotically correct while keeping its finite exactness property when data are exchangeable. The results of extensive simulation studies foster these theoretical findings. A real data set exemplifies its applicability. © 2017 The British Psychological Society.

  6. Acceptability of using electronic vending machines to deliver oral rapid HIV self-testing kits: a qualitative study.

    Directory of Open Access Journals (Sweden)

    Sean D Young

    Full Text Available Rates of unrecognized HIV infection are significantly higher among Latino and Black men who have sex with men (MSM. Policy makers have proposed that HIV self-testing kits and new methods for delivering self-testing could improve testing uptake among minority MSM. This study sought to conduct qualitative assessments with MSM of color to determine the acceptability of using electronic vending machines to dispense HIV self-testing kits.African American and Latino MSM were recruited using a participant pool from an existing HIV prevention trial on Facebook. If participants expressed interest in using a vending machine to receive an HIV self-testing kit, they were emailed a 4-digit personal identification number (PIN code to retrieve the test from the machine. We followed up with those who had tested to assess their willingness to participate in an interview about their experience.Twelve kits were dispensed and 8 interviews were conducted. In general, participants expressed that the vending machine was an acceptable HIV test delivery method due to its novelty and convenience.Acceptability of this delivery model for HIV testing kits was closely associated with three main factors: credibility, confidentiality, and convenience. Future research is needed to address issues, such as user-induced errors and costs, before scaling up the dispensing method.

  7. Acceptability of using electronic vending machines to deliver oral rapid HIV self-testing kits: a qualitative study.

    Science.gov (United States)

    Young, Sean D; Daniels, Joseph; Chiu, ChingChe J; Bolan, Robert K; Flynn, Risa P; Kwok, Justin; Klausner, Jeffrey D

    2014-01-01

    Rates of unrecognized HIV infection are significantly higher among Latino and Black men who have sex with men (MSM). Policy makers have proposed that HIV self-testing kits and new methods for delivering self-testing could improve testing uptake among minority MSM. This study sought to conduct qualitative assessments with MSM of color to determine the acceptability of using electronic vending machines to dispense HIV self-testing kits. African American and Latino MSM were recruited using a participant pool from an existing HIV prevention trial on Facebook. If participants expressed interest in using a vending machine to receive an HIV self-testing kit, they were emailed a 4-digit personal identification number (PIN) code to retrieve the test from the machine. We followed up with those who had tested to assess their willingness to participate in an interview about their experience. Twelve kits were dispensed and 8 interviews were conducted. In general, participants expressed that the vending machine was an acceptable HIV test delivery method due to its novelty and convenience. Acceptability of this delivery model for HIV testing kits was closely associated with three main factors: credibility, confidentiality, and convenience. Future research is needed to address issues, such as user-induced errors and costs, before scaling up the dispensing method.

  8. Controls in new construction reactors-factory testing of the non-safety portion of the Lungmen nuclear power plant distributed control system

    International Nuclear Information System (INIS)

    Wu, Y. S.; Dick, J. W.; Tetirick, C. W.

    2006-01-01

    The construction permit for Taipower's Lungmen Nuclear Units 1 and 2, two ABWR plants, was issued on March 17, 1999[1], The construction of these units is progressing actively at site. The digital I and C system supplied by GE, which is designated as the Distributed Control and Information System (DCIS) in this project, is being implemented primarily at one vendor facility. In order to ensure the reliability, safety and availability of the DCIS, it is required to comprehensively test the whole DCIS in factory. This article describes the test requirements and acceptance criteria for functional testing of the Non-Safety Distributed Control and Information system (DCIS) for Taiwan Power's Lungmen Units 1 and 2 GE selected Invensys as the equipment supplier for this Non-Safety portion of DCIS. The DCIS system of the Lungmen Units is a physically distributed control system. Field transmitters are connected to hard I/O terminal inputs on the Invensys I/A system. Once the signal is digitized on FBMs (Field Bus Modules) in Remote Multiplexing Units (RMUs), the signal is passed into an integrated control software environment. Control is based on the concept of compounds and blocks where each compound is a logical collection of blocks that performs a control function. Each point identified by control compound and block can be individually used throughout the DCIS system by referencing its unique name. In the Lungmen Project control logic and HSI (Human System Interface) requirements are divided into individual process systems called MPLs (Master Parts List). Higher-level Plant Computer System (PCS) algorithms access control compounds and blocks in these MPLs to develop functions. The test requirements and acceptance criteria for the DCIS system of the Lungmen Project are divided into three general categories (see 1,2,3 below) of verification, which in turn are divided into several specific tests: 1. DCIS System Physical Checks a) RMU Test - To confirm that the hard I

  9. Controls in new construction reactors-factory testing of the non-safety portion of the Lungmen nuclear power plant distributed control system

    Energy Technology Data Exchange (ETDEWEB)

    Wu, Y. S. [Taiwan Power Company, 242, Roosevelt Road, Sec. 3, Taipei 100, Taiwan (China); Dick, J. W. [Invensys System Inc., 33 Commercial St., Foxboro, MA 02035 (United States); Tetirick, C. W. [GE Energy, 1989 Little Orchard Street, San Jose, CA 95125-1030 (United States)

    2006-07-01

    The construction permit for Taipower's Lungmen Nuclear Units 1 and 2, two ABWR plants, was issued on March 17, 1999[1], The construction of these units is progressing actively at site. The digital I and C system supplied by GE, which is designated as the Distributed Control and Information System (DCIS) in this project, is being implemented primarily at one vendor facility. In order to ensure the reliability, safety and availability of the DCIS, it is required to comprehensively test the whole DCIS in factory. This article describes the test requirements and acceptance criteria for functional testing of the Non-Safety Distributed Control and Information system (DCIS) for Taiwan Power's Lungmen Units 1 and 2 GE selected Invensys as the equipment supplier for this Non-Safety portion of DCIS. The DCIS system of the Lungmen Units is a physically distributed control system. Field transmitters are connected to hard I/O terminal inputs on the Invensys I/A system. Once the signal is digitized on FBMs (Field Bus Modules) in Remote Multiplexing Units (RMUs), the signal is passed into an integrated control software environment. Control is based on the concept of compounds and blocks where each compound is a logical collection of blocks that performs a control function. Each point identified by control compound and block can be individually used throughout the DCIS system by referencing its unique name. In the Lungmen Project control logic and HSI (Human System Interface) requirements are divided into individual process systems called MPLs (Master Parts List). Higher-level Plant Computer System (PCS) algorithms access control compounds and blocks in these MPLs to develop functions. The test requirements and acceptance criteria for the DCIS system of the Lungmen Project are divided into three general categories (see 1,2,3 below) of verification, which in turn are divided into several specific tests: 1. DCIS System Physical Checks a) RMU Test - To confirm that the hard

  10. STANFORD (SLAC): B factory construction begins

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    At a ceremony marking the start of construction, members of the US Congress and Secretary of Energy Hazel O'Leary hailed the new Asymmetric B Factory as the key to continued vitality of the Stanford Linear Accelerator Center (SLAC). Being built in collaboration with the Lawrence Berkeley Laboratory and the Lawrence Livermore National Laboratory, the B factory is a $177 million upgrade of the existing PEP electron-positron collider. Scheduled for completion in 1998, the B factory will generate many millions of B mesons, allowing, among other physics, an intensive search for the phenomena of CP violation in the decays of these particles

  11. Engineering the Polyketide Cell Factory

    DEFF Research Database (Denmark)

    Mølgaard, Louise

    sufficient titers. To improve the production of polyketides biological engineering principles have been applied for the development and engineering of microbial polyketide cell factories. The two biological hosts used for heterologous polyketide production were Aspergillus nidulans and Saccharomyces...... phosphopantetheinylase (PPTase). This versatile vector system can easily be used for expression of other polyketides of interest as well as extended to express whole gene clusters. After achieving proof of principle in terms of expression, the polyketide cell factory must be optimized. The optimization can be achieved...... characterization in bioreactors revealed that the yields of 6-MSA on biomass increased albeit not significantly. As a result of this it may be argued that there is still more work to be done in terms of model building in A. nidulans. Utilizing another well-established cell factory S. cerevisiae the capabilities...

  12. Photon Factory activity report, 1991

    International Nuclear Information System (INIS)

    1992-01-01

    The Photon Factory is a national synchrotron radiation research facility affiliated with the National Laboratory for High Energy Physics located in Tsukuba Science City. The Photon Factory consists of a 2.5 GeV electron/positron linear accelerator, a 2.5 GeV electron/positron storage ring, beam lines and experimental stations. All the facilities for synchrotron radiation research are open to scientists. A part of the accumulation ring of the TRISTAN main ring has been used as a synchrotron radiation source in the energy range from 5.8 to 6.5 GeV. The Photon Factory is composed of three divisions of Injector Linac, Light Source and Instrumentation. The researches of each divisions are reviewed, and the users' short reports are collected. The list of published papers with author index is also included in the publication. (K.I.) 233 refs

  13. Survivor shielding. Part A. Nagasaki factory worker shielding

    International Nuclear Information System (INIS)

    Santoro, Robert T.; Barnes, John M.; Azmy, Yousry Y.; Kerr, George D.; Egbert, Stephen D.; Cullings, Harry M.

    2005-01-01

    Recent investigations based on conventional chromosome aberration data by the RERF suggest that the DS86 doses received by many Nagasaki factory workers may have been overestimated by as much as 40% relative to those for other survivors in Japanese-type houses and other shielding configurations (Kodama et al. 2001). Since the factory workers represent about 25% of the Nagasaki survivors with DS86 doses in excess of 0.5 Gy (50 rad), systematic errors in their dose estimates can have a major impact on the risk coefficients from RERF studies. The factory worker doses may have been overestimated for a number of reasons. The calculation techniques, including the factory building modeling, weapon source spectra and cross-section data used in the DS86 shielding calculations were not detailed enough to replicate actual conditions. The models used did not take into account local shielding provided by machinery, tools, and the internal structure in the buildings. In addition, changes in the disposition of shielding following collapse of the building by the blast wave were not considered. The location of large factory complexes may be uncertain, causing large numbers of factory survivors, correctly located relative to each other, to be uniformly too close to the hypocenter. Any or all of these reasons are sufficient to result in an overestimate of the factory worker doses. During the DS02 studies, factory worker doses have been reassessed by more carefully modeling the factory buildings, incorporating improved radiation transport methods and cross-section data and using the most recent bomb leakage spectra (Chapter 2). Two-dimensional discrete ordinates calculations were carried out initially to estimate the effects of workbenches and tools on worker doses to determine if the inclusion of these components would, in fact, reduce the dose by amounts consistent with the RERF observations (Kodama et al. 2001). (author)

  14. INDOOR THERMAL CONDITION OF FACTORY BUILDING IN BANGLADESH

    Directory of Open Access Journals (Sweden)

    Muhammed Abdullah Al Sayem Khan

    2011-12-01

    Full Text Available Bangladesh is a developing country and has a lot of factories for different products for local use and also export to abroad. Garments industries are one of the top most items of exported items. A huge number of populations are working in garments industries. But these factories are not well designed in sense of the thermal environment. Workers experiences sickness related to indoor environment. The productions of these factories are affected due to employees’ health condition. The research is done in two different methods. One is empirical data collection using thermal data loggers and the other is questionnaire survey on the spots for three factory buildings. The field study was conducted in four different months of the same year during winter and summer period. Expected findings of this research are that the indoor environment is not comfortable for works at day time during summer season. This research will help the factory workers in providing a comfortable thermal environment and also help the employers or factory owners to increase their production margin.

  15. System acceptance and operability test report for the RMCS exhauster C on flammable gas tanks

    International Nuclear Information System (INIS)

    Waldo, E.J.

    1998-01-01

    This test report documents the completion of acceptance and operability testing of the rotary mode core sampling (RMCS) exhauster C, as modified for use as a major stack (as defined by the Washington State Department of Health) on flammable gas tanks

  16. Atomic Energy (factories) rules: 1988

    International Nuclear Information System (INIS)

    1988-01-01

    These rules are made by the Central Government under the Factories Act, 1948 and extend to all factories engaged in carrying out the purposes of the Atomic Energy Act, 1962. The rules cover the requirements of inspecting staff, health aspects, personnel safety, personnel welfare, working hours, employment of young persons, special provisions in case of dangerous manufacturing processes or operations, supplemental rules for administrative aspects and special powers of competent authority. (M.G.B.)

  17. Perceived Competence Scale for Children: Testing for Factorial Validity and Invariance across Age and Ability.

    Science.gov (United States)

    Byrne, Barbara M.; Schneider, Barry H.

    1988-01-01

    For 241 normal and 132 gifted fifth graders and 113 normal and 117 gifted seventh graders in Ottawa (Ontario), exploratory and confirmatory factor analyses investigated the factorial validity of the Perceived Competence Scale for Children (PCSC). Overall, the PCSC demonstrated sound psychometric properties. (SLD)

  18. Probabilistic Requirements (Partial) Verification Methods Best Practices Improvement. Variables Acceptance Sampling Calculators: Empirical Testing. Volume 2

    Science.gov (United States)

    Johnson, Kenneth L.; White, K. Preston, Jr.

    2012-01-01

    The NASA Engineering and Safety Center was requested to improve on the Best Practices document produced for the NESC assessment, Verification of Probabilistic Requirements for the Constellation Program, by giving a recommended procedure for using acceptance sampling by variables techniques as an alternative to the potentially resource-intensive acceptance sampling by attributes method given in the document. In this paper, the results of empirical tests intended to assess the accuracy of acceptance sampling plan calculators implemented for six variable distributions are presented.

  19. SU-F-T-475: An Evaluation of the Overlap Between the Acceptance Testing and Commissioning Processes for Conventional Medical Linear Accelerators

    International Nuclear Information System (INIS)

    Morrow, A; Rangaraj, D; Perez-Andujar, A; Krishnamurthy, N

    2016-01-01

    Purpose: This work’s objective is to determine the overlap of processes, in terms of sub-processes and time, between acceptance testing and commissioning of a conventional medical linear accelerator and to evaluate the time saved by consolidating the two processes. Method: A process map for acceptance testing for medical linear accelerators was created from vendor documentation (Varian and Elekta). Using AAPM TG-106 and inhouse commissioning procedures, a process map was created for commissioning of said accelerators. The time to complete each sub-process in each process map was evaluated. Redundancies in the processes were found and the time spent on each were calculated. Results: Mechanical testing significantly overlaps between the two processes - redundant work here amounts to 9.5 hours. Many beam non-scanning dosimetry tests overlap resulting in another 6 hours of overlap. Beam scanning overlaps somewhat - acceptance tests include evaluating PDDs and multiple profiles but for only one field size while commissioning beam scanning includes multiple field sizes and depths of profiles. This overlap results in another 6 hours of rework. Absolute dosimetry, field outputs, and end to end tests are not done at all in acceptance testing. Finally, all imaging tests done in acceptance are repeated in commissioning, resulting in about 8 hours of rework. The total time overlap between the two processes is about 30 hours. Conclusion: The process mapping done in this study shows that there are no tests done in acceptance testing that are not also recommended to do for commissioning. This results in about 30 hours of redundant work when preparing a conventional linear accelerator for clinical use. Considering these findings in the context of the 5000 linacs in the United states, consolidating acceptance testing and commissioning would have allowed for the treatment of an additional 25000 patients using no additional resources.

  20. SU-F-T-475: An Evaluation of the Overlap Between the Acceptance Testing and Commissioning Processes for Conventional Medical Linear Accelerators

    Energy Technology Data Exchange (ETDEWEB)

    Morrow, A [Scott & White Hospital Temple, TX (United States); Rangaraj, D [Baylor Scott & White Health, Temple, TX (United States); Perez-Andujar, A [University of California San Francisco, San Francisco, CA (United States); Krishnamurthy, N [Baylor Scott & White Healthcare, Temple, TX (United States)

    2016-06-15

    Purpose: This work’s objective is to determine the overlap of processes, in terms of sub-processes and time, between acceptance testing and commissioning of a conventional medical linear accelerator and to evaluate the time saved by consolidating the two processes. Method: A process map for acceptance testing for medical linear accelerators was created from vendor documentation (Varian and Elekta). Using AAPM TG-106 and inhouse commissioning procedures, a process map was created for commissioning of said accelerators. The time to complete each sub-process in each process map was evaluated. Redundancies in the processes were found and the time spent on each were calculated. Results: Mechanical testing significantly overlaps between the two processes - redundant work here amounts to 9.5 hours. Many beam non-scanning dosimetry tests overlap resulting in another 6 hours of overlap. Beam scanning overlaps somewhat - acceptance tests include evaluating PDDs and multiple profiles but for only one field size while commissioning beam scanning includes multiple field sizes and depths of profiles. This overlap results in another 6 hours of rework. Absolute dosimetry, field outputs, and end to end tests are not done at all in acceptance testing. Finally, all imaging tests done in acceptance are repeated in commissioning, resulting in about 8 hours of rework. The total time overlap between the two processes is about 30 hours. Conclusion: The process mapping done in this study shows that there are no tests done in acceptance testing that are not also recommended to do for commissioning. This results in about 30 hours of redundant work when preparing a conventional linear accelerator for clinical use. Considering these findings in the context of the 5000 linacs in the United states, consolidating acceptance testing and commissioning would have allowed for the treatment of an additional 25000 patients using no additional resources.

  1. Influence of heat consumers distribution and flashing vapours effect on steam consumption of evaporation plant of sugar factory

    Directory of Open Access Journals (Sweden)

    A. A. Gromkovskii

    2016-01-01

    Full Text Available The article considered the influence of the heat consumers distribution and the flashing vapours effect juice for multipleevaporator sugar factory on the consumption the main production flow of heat transfer agent – water vapor. The problem of rational distribution of heat transfer agent for of the corps multiple-evaporator is relevant from point of view of energy saving and energysaving heat of the sugar factory. The solution to this problem is advantageously carried out on the basis of quantitative mathematical description of the distribution of vapor on the corps of the evaporation plant. The heat consumers distribution should be based on technical and economic calculation. To solve this problem it is advisable to use a single equation that determines the dependence of the steam flow in the first unit evaporator on the amount of evaporated water and the method of heat consumers distribution for housing. Evaporators sugar factory has two functions – technology and heat, each of which is described by its equation. On the basis of the material and heat balance equations for the realization of the basic functions of the system evaporator written multipleevaporator equations. The solution of this system allows you to obtain the equation of the steam flow and the amount of evaporated water, taking into account the flashing vapours effect. Solution of the system should take into account the accepted design standards of sugar factories. As a result of solving the system of equation is obtained, which allows you to organize and optimize the heat consumers distribution of the corps evaporator. The equation can be used for any number of units evaporator. This equation allows you to assess the efficiency of the evaporation plant of a sugar factory. This is of great practical importance in the modernization of thermal schemes of sugar factories.

  2. Flow-based approach for holistic factory engineering and design

    OpenAIRE

    Constantinescu, C.; Westkämper, E.

    2010-01-01

    The engineering of future factories requires digital tools along life cycle phases from investment planning to ramp-up. Manufacturers need scientific-based integrated highly dynamic data management systems for the participative and integrated factory planning. The paper presents a new approach for the continuously integrated product design, factory and process planning, through a service-oriented architecture for the implementation of digital factory tools. A first prototype of the digital fa...

  3. One, two or three dimensions of work engagement? Testing the factorial validity of the Utrecht Work Engagement Scale on a sample of Polish employees.

    Science.gov (United States)

    Kulikowski, Konrad

    2017-10-11

    Work engagement, as conceptualized by the Utrecht Work Engagement Scale (UWES), is a work-related positive state of mind that is characterized by vigour, dedication and absorption; however, it still remains unclear how many dimensions work engagement comprises. This study tested the factorial validity of 11 different UWES factorial models that are available in the literature using a confirmatory factor analysis approach on a large sample of multi-occupational Polish employees (N = 1420). The two-factor UWES-6, comprising vigour and dedication, was found to be reliable and remained invariant across samples drawn from four different organizational positions. It also presented a better fit than the three-factor UWES-9, which is a scale used as a standard in contemporary research on work engagement. The findings suggest that the three-factor UWES-9 might not be an optimal measure of work engagement in Poland.

  4. Project W-314 specific test and evaluation plan for SN-633 transfer line (241-AX-B to 241-AY-02A)

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-633 transfer line by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the addition of transfer line SN-633. The Project Design Specifications (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation

  5. Factors associated with acceptance of provider-initiated HIV testing and counseling among pregnant women in Ethiopia.

    Science.gov (United States)

    Gebremedhin, Ketema Bizuwork; Tian, Bingjie; Tang, Chulei; Zhang, Xiaoxia; Yisma, Engida; Wang, Honghong

    2018-01-01

    The global human immunodeficiency virus (HIV) epidemic disproportionately affects sub-Saharan African countries, including Ethiopia. Provider-initiated HIV testing and counseling (PITC) is a tool to identify HIV-positive pregnant women and an effective treatment and prevention strategy. However, its success depends upon the willingness of pregnant women to accept HIV testing. To describe the level of acceptance of PITC and associated factors among pregnant women attending 8 antenatal care clinics in Adama, Ethiopia. Trained nursing students and employees from an HIV clinic conducted face-to-face structured interviews in private offices at the clinics from August to September, 2016. Among the 441 respondents, 309 (70.1%) accepted PITC. Women with more antenatal care visits (odds ratio [OR] =2.59, 95% CI: 1.01-6.63), reported better quality of the PITC service (OR =1.91, 95% CI: 1.19-3.08), and higher level of knowledge on mother-to-child transmission (OR =1.82, 95% CI: 1.03-3.20), were more likely to accept PITC, while women who were older in age (OR =0.37, 95% CI: 0.19-0.74) and perceived negative attitudes from their partners toward HIV-positive results (OR =0.31, 95% CI: 0.10-0.94) were less likely to accept the PITC service. About one-third of pregnant women are not willing to accept PITC. When designing intervention program to improve the acceptance of PITC, we should take into consideration the personal factors, HIV-related knowledge, and attitude of women as well as institutional factors.

  6. Resolve. Version 2.5: Flammable Gas Accident Analysis Tool Acceptance Test Plan and Test Results

    International Nuclear Information System (INIS)

    LAVENDER, J.C.

    2000-01-01

    RESOLVE. Version 2 .5 is designed to quantify the risk and uncertainty of combustion accidents in double-shell tanks (DSTs) and single-shell tanks (SSTs). The purpose of the acceptance testing is to ensure that all of the options and features of the computer code run; to verify that the calculated results are consistent with each other; and to evaluate the effects of the changes to the parameter values on the frequency and consequence trends associated with flammable gas deflagrations or detonations

  7. Biological and chemical tests of contaminated soils to determine bioavailability and environmentally acceptable endpoints (EAE)

    International Nuclear Information System (INIS)

    Montgomery, C.R.; Menzie, C.A.; Pauwells, S.J.

    1995-01-01

    The understanding of the concept of bioavailability of soil contaminants to receptors and its use in supporting the development of EAE is growing but still incomplete. Nonetheless, there is increased awareness of the importance of such data to determine acceptable cleanup levels and achieve timely site closures. This presentation discusses a framework for biological and chemical testing of contaminated soils developed as part of a Gas Research Institute (GRI) project entitled ''Environmentally Acceptable Endpoints in Soil Using a Risk Based Approach to Contaminated Site Management Based on Bioavailability of Chemicals in Soil.'' The presentation reviews the GRI program, and summarizes the findings of the biological and chemical testing section published in the GRI report. The three primary components of the presentation are: (1) defining the concept of bioavailability within the existing risk assessment paradigm, (2) assessing the usefulness of the existing tests to measure bioavailability and test frameworks used to interpret these measurements, and (3) suggesting how a small selection of relevant tests could be incorporated into a flexible testing scheme for soils to address this issue

  8. Math for the digital factory

    CERN Document Server

    Hömberg, Dietmar; Landry, Chantal

    2017-01-01

    This volume provides a unique collection of mathematical tools and industrial case studies in digital manufacturing. It addresses various topics, ranging from models of single production technologies, production lines, logistics and workflows to models and optimization strategies for energy consumption in production. The digital factory represents a network of digital models and simulation and 3D visualization methods for the holistic planning, realization, control and ongoing improvement of all factory processes related to a specific product. In the past ten years, all industrialized countries have launched initiatives to realize this vision, sometimes also referred to as Industry 4.0 (in Europe) or Smart Manufacturing (in the United States). Its main goals are • reconfigurable, adaptive and evolving factories capable of small-scale production • high-performance production, combining flexibility, productivity, precision and zero defects • energy and resource efficiency in manufacturing None of these...

  9. Manufacturing and testing of a ITER First Wall Semi-Prototype for EUDA pre-qualification

    International Nuclear Information System (INIS)

    Banetta, S.; Bellin, B.; Lorenzetto, P.; Zacchia, F.; Boireau, B.; Bobin, I.; Boiffard, P.; Cottin, A.; Nogue, P.; Mitteau, R.; Eaton, R.; Raffray, R.; Bürger, A.; Du, J.; Linke, J.; Pintsuk, G.; Weber, T.

    2015-01-01

    Highlights: • Three ITER First Wall Small Scale Mock-ups were manufactured passing factory acceptance tests. • One of the Small Scale Mock-ups passed the thermal fatigue tests (15,000 cycles at 2 MW/m"2). • The ITER First Wall Semi-Prototype was manufactured and is being High Heat Flux tested. • Preliminary results upto 2 MW/m"2 show an overall compliance with the acceptance criteria. • Next step for EU Domestic Agency qualification is the fabrication and testing of a Full-Scale Prototype. - Abstract: This paper describes the main activities carried out in the frame of EU-DA prequalification for the supply of Normal Heat Flux (NHF) First Wall (FW) panels to ITER. A key part of these activities is the manufacturing development, the fabrication and the factory acceptance tests of a reduced scale FW prototype (Semi-Prototype (SP)) of the NHF design. The SP has a dimension of 221 mm × 665 mm, corresponding to about 1/6 of a full-scale panel, with six full-scale “fingers” and bearing a total of 84 beryllium tiles. It has been manufactured by the AREVA Company in France. The manufacturing process has made extensive use of Hot Isostatic Pressing, which was developed over more than a decade during the ITER Engineering Design Activity phase. The main manufacturing steps for the Semi-Prototype are recalled, with a summary of the lessons learned and the implications with regard to the design and manufacturing of the full-scale prototype and of the series fabrication of the EU-DA share of the ITER first wall (215 NHF panels). The fabricated SP is then tested under High Heat Flux (HHF) in the dedicated test facility of JUDITH-II in Forschungszentrum Jülich, Germany. The objective of the HHF testing is the demonstration of achieving the requested performance under thermal fatigue. The test protocol and facility qualification are presented and the behaviour of the fingers under the 7500 cycles at 2 MW/m"2 is described in detail.

  10. Manufacturing and testing of a ITER First Wall Semi-Prototype for EUDA pre-qualification

    Energy Technology Data Exchange (ETDEWEB)

    Banetta, S., E-mail: stefano.banetta@f4e.europa.eu [Fusion For Energy, Torres Diagonal Litoral, B3, Carrer Josep Pla 2, 08019 Barcelona (Spain); Bellin, B.; Lorenzetto, P.; Zacchia, F. [Fusion For Energy, Torres Diagonal Litoral, B3, Carrer Josep Pla 2, 08019 Barcelona (Spain); Boireau, B.; Bobin, I.; Boiffard, P.; Cottin, A.; Nogue, P. [AREVA NP PTCMI-F, Centre Technique, Fusion, 71200 Le Creusot (France); Mitteau, R.; Eaton, R.; Raffray, R. [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St. Paul Lez Durance Cedex (France); Bürger, A.; Du, J.; Linke, J.; Pintsuk, G.; Weber, T. [Forschungszentrum Jülich, Institute of Energy and Climate Research, Jülich (Germany)

    2015-10-15

    Highlights: • Three ITER First Wall Small Scale Mock-ups were manufactured passing factory acceptance tests. • One of the Small Scale Mock-ups passed the thermal fatigue tests (15,000 cycles at 2 MW/m{sup 2}). • The ITER First Wall Semi-Prototype was manufactured and is being High Heat Flux tested. • Preliminary results upto 2 MW/m{sup 2} show an overall compliance with the acceptance criteria. • Next step for EU Domestic Agency qualification is the fabrication and testing of a Full-Scale Prototype. - Abstract: This paper describes the main activities carried out in the frame of EU-DA prequalification for the supply of Normal Heat Flux (NHF) First Wall (FW) panels to ITER. A key part of these activities is the manufacturing development, the fabrication and the factory acceptance tests of a reduced scale FW prototype (Semi-Prototype (SP)) of the NHF design. The SP has a dimension of 221 mm × 665 mm, corresponding to about 1/6 of a full-scale panel, with six full-scale “fingers” and bearing a total of 84 beryllium tiles. It has been manufactured by the AREVA Company in France. The manufacturing process has made extensive use of Hot Isostatic Pressing, which was developed over more than a decade during the ITER Engineering Design Activity phase. The main manufacturing steps for the Semi-Prototype are recalled, with a summary of the lessons learned and the implications with regard to the design and manufacturing of the full-scale prototype and of the series fabrication of the EU-DA share of the ITER first wall (215 NHF panels). The fabricated SP is then tested under High Heat Flux (HHF) in the dedicated test facility of JUDITH-II in Forschungszentrum Jülich, Germany. The objective of the HHF testing is the demonstration of achieving the requested performance under thermal fatigue. The test protocol and facility qualification are presented and the behaviour of the fingers under the 7500 cycles at 2 MW/m{sup 2} is described in detail.

  11. MICROBIAL CONSORTIA ENGINEERING FOR CELLULAR FACTORIES: IN VITRO TO IN SILICO SYSTEMS

    Directory of Open Access Journals (Sweden)

    Hans C Bernstein

    2012-10-01

    Full Text Available This mini-review discusses the current state of experimental and computational microbial consortia engineering with a focus on cellular factories. A discussion of promising ecological theories central to community resource usage is presented to facilitate interpretation of consortial designs. Recent case studies exemplifying different resource usage motifs and consortial assembly templates are presented. The review also highlights in silico approaches to design and to analyze consortia with an emphasis on stoichiometric modeling methods. The discipline of microbial consortia engineering possesses a widely accepted potential to generate highly novel and effective bio-catalysts for applications from biofuels to specialty chemicals to enhanced mineral recovery.

  12. Acceptance testing in digital systens of mammography. Protocols applicability; Pruebas de aceptacion en equipos digitales de mamografia. Aplicabilidad de protocolos

    Energy Technology Data Exchange (ETDEWEB)

    Bermudez, R.; Espana, M.L.; Garcia Castanon, P.; Gomez Barrado, A.; Rodriguez Martin, G.; Fernandez Bedoya, B.

    2011-07-01

    Acceptance testing of mammographic imaging systems technical is the first approach in order to guarantee that mammograms will be achieved with the minimun radiation dose compatible with an image quality sutiable for diagnose purposes. The aim of this study is to assess the practical applicability of different protocols in acceptance test of digital mammographyc systems. This study has been carried out on the results of ltyhe acceptance tests of five flat panel digital mammographic systems. Parameters established in the systems technical specifications and those evaluated in the consulted protocols were tested. Due to the fact that the legislation oin our country does not demand to consider a specific protocol, the results obtained were also compared considering different existing protocols. Results show discrepancies between manufacturers limiting values and those established in the protocols. Some parameters, such as the authomatic exposure control compensation and the detector noise, were found out to meet or not the limiting value, depending on the selected protocol. From our results we could suggest, that protocols from manufacturers should be adapted to acknowledged documents on acceptance testing in digital mammography. They buyer representative could even specify the protocol to be followed during the acceptance tests. (Author). 25 refs.

  13. Acceptance testing in digital systems of mammography. Protocols applicability; Pruebas de aceptacion en equipos digitales de mamografia. Aplicabilidad de protocolos

    Energy Technology Data Exchange (ETDEWEB)

    Bermudez, R.; Espana, M.L.; Garcia Castanon, P.; Gomez Barrado, A.; Rodriguez Martin, G.; Fernandez Bedoya, B.

    2011-07-01

    Acceptance testing of mammographic imaging systems technical is the first approach in order to guarantee that mammograms will be achieved with the minimum radiation dose compatible with an image quality suitable for diagnose purposes. The aim of this study is to assess the practical applicability of different protocols in acceptance test of digital mammographic systems. This study has been carried out on the results of the acceptance tests of five flat panel digital mammographic systems. Parameters established in the systems technical specifications and those evaluated in the consulted protocols were tested. Due to the fact that the legislation in our country does not demand to consider a specific protocol, the results obtained were also compared considering different existing protocols. Results show discrepancies between manufacturers limiting values and those established in the protocols. Some parameters, such as the automatic exposure control compensation and the detector noise, were found out to meet or not the limiting value, depending on the selected protocol. From our results we could suggest, that protocols from manufacturers should be adapted to acknowledged documents on acceptance testing in digital mammography. They buyer representative could even specify the protocol to be followed during the acceptance tests. (Author). 25 refs.

  14. A Tau-Charm Factory at CEBAF

    Energy Technology Data Exchange (ETDEWEB)

    Seth, K.K. [Northwestern Univ., Evanston, IL (United States)

    1994-04-01

    It is proposed that a Tau Charm Factory represents a natural extension of CEBAF into higher energy domains. The exciting nature of the physics of charm quarks and tau leptons is briefly reviewed and it is suggested that the concept of a linac-ring collider as a Tau Charm Factory at CEBAF should be seriously studied.

  15. Acceptability and Barriers to Uptake of Voluntary Counselling and Testing for HIV amongst Pregnant Women in Nigeria

    Directory of Open Access Journals (Sweden)

    Bukola Olateju Omolase

    2010-08-01

    Full Text Available AIM: This study was designed to determine the acceptability of voluntary counselling and testing (VCT for HIV and identify possible barriers to it’s uptake amongst pregnant women in a Nigerian community. METHODS: One hundred and twenty seven consenting pregnant women attending antenatal clinic at Federal Medical Centre, Owo were randomly selected and interviewed by the authors and two trained assistants. The study was conducted between August and October, 2007. The information obtained with the aid of semi –structured questionnaire included their bio data, awareness about VCT and vertical transmission of HIV-AIDS. Other information obtained included acceptability of VCT and barriers to its uptake. RESULT: Majority (85% were aware about vertical transmission of HIV, most (83.5% knew of VCT. They were predominantly willing to accept VCT (77.2% and were ready to recommend VCT to others(76.2%. The main identified barriers to uptake of voluntary counseling were fear of possible outcome (82.7% and risk of divorce (70.9%. CONCLUSION: Most respondents were aware of voluntary counselling and testing for HIV as well as the vertical transmission of HIV. Majority were willing to accept HIV test and recommend same to others. Barriers to uptake of HIV test included fear of possible outcome, lack of felt need, stigmatization and financial constraint. There is need to extend voluntary counselling and testing for HIV to all antenatal patients. [TAF Prev Med Bull 2010; 9(4.000: 309-314

  16. LAMPF: the meson factory. A LASL monograph

    International Nuclear Information System (INIS)

    Allred, J.C.

    1977-08-01

    A general and simplified introduction to the entire concept of LAMPF is given in terms of its experimental capabilities. Parts of the current experimental program are used as illustrative examples. Topics discussed include: (1) the evolution of the meson factory; (2) accelerator construction; (3) strong focusing; (4) accelerator innovations at LAMPF; (5) photons and pions; (6) muons as nuclear probes; (7) nuclear chemistry; (8) radiobiology and medical applications; (9) radioisotope production; (10) materials testing; and (11) LAMPF management and users group

  17. LAMPF: the meson factory. A LASL monograph

    Energy Technology Data Exchange (ETDEWEB)

    Allred, J.C.

    1977-08-01

    A general and simplified introduction to the entire concept of LAMPF is given in terms of its experimental capabilities. Parts of the current experimental program are used as illustrative examples. Topics discussed include: (1) the evolution of the meson factory; (2) accelerator construction; (3) strong focusing; (4) accelerator innovations at LAMPF; (5) photons and pions; (6) muons as nuclear probes; (7) nuclear chemistry; (8) radiobiology and medical applications; (9) radioisotope production; (10) materials testing; and (11) LAMPF management and users group. (PMA)

  18. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, D.C.

    2000-06-01

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed LOI equipment, including a model 1608FL CM{trademark} Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform Loss on Ignition (LOI) testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet Glfilter will he flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A.

  19. The Three-dimensional Digital Factory for Shipbuilding Technology Research

    Directory of Open Access Journals (Sweden)

    Xu Wei

    2016-01-01

    Full Text Available The three-dimensional digital factory technology research is the hotspot in shipbuilding recently. The three-dimensional digital factory technology not only focus on design the components of the product, but also discuss on the simulation and analyses of the production process.Based on the three-dimensional model, the basic data layer, application control layer and the presentation layer of hierarchical structure are established in the three-dimensional digital factory of shipbuilding in this paper. And the key technologies of three-dimensional digital factory of shipbuilding are analysed. Finally, a case study is applied and the results show that the three-dimensional digital factory will play an important role in the future.

  20. Acceptability of rapid diagnostic test-based management of Malaria among caregivers of under-five children in rural Ghana.

    Directory of Open Access Journals (Sweden)

    Frank Baiden

    Full Text Available WHO now recommends test-based management of malaria (TBMM across all age-groups. This implies artemisinin-based combination treatment (ACT should be restricted to rapid diagnostic test (RDT-positive cases. This is a departure from what caregivers in rural communities have been used to for many years.We conducted a survey among caregivers living close to 32 health centres in six districts in rural Ghana and used logistic regression to explore factors likely to influence caregiver acceptability of RDT based case management and concern about the denial of ACT on account of negative RDT results. Focus group discussions were conducted to explain the quantitative findings and to elicit further factors.A total of 3047 caregivers were interviewed. Nearly all (98% reported a preference for TBMM over presumptive treatment. Caregivers who preferred TBMM were less likely to be concerned about the denial of ACT to their test-negative children (O.R. 0.57, 95%C.I. 0.33-0.98. Compared with caregivers who had never secured national health insurance cover, caregivers who had valid (adjusted O.R. 1.30, 95% CI 1.07-1.61 or expired (adjusted O.R. 1.38, 95% CI 1.12-1.73 insurance cover were more likely to be concerned about the denial of ACT to their RDT-negative children. Major factors that promote TBMM acceptability include the perception that a blood test at health centre level represents improvement in the quality of care, leads to improvement in treatment outcomes, and offers opportunity for better communication between health workers and caregivers. Acceptability is also enhanced by engaging caregivers in the procedures of the test. Apprehensions about negative health worker attitude could however undermine acceptance.Test (RDT-based management of malaria in under-five children is likely to be acceptable to caregivers in rural Ghana. The quality of caregiver-health worker interaction needs to be improved if acceptability is to be sustained.

  1. A data base and a standard material for use in acceptance testing of low-activity waste products

    International Nuclear Information System (INIS)

    Wolf, S.F.; Ebert, W.L.; Luo, J.S.; Strachan, D.M.

    1998-04-01

    The authors have conducted replicate dissolution tests following the product consistency test (PCT) procedure to measure the mean and standard deviation of the solution concentrations of B, Na, and Si at various combinations of temperature, duration, and glass/water mass ratio. Tests were conducted with a glass formulated to be compositionally similar to low-activity waste products anticipated for Hanford to evaluate the adequacy of test methods that have been designated in privatization contracts for use in product acceptance. An important finding from this set of tests is that the solution concentrations generated in tests at 20 C will likely be too low to measure the dissolution rates of waste products reliably. Based on these results, the authors recommend that the acceptance test be conducted at 40 C. Tests at 40 C generated higher solution concentrations, were more easily conducted, and the measured rates were easily related to those at 20 C. Replicate measurements of other glass properties were made to evaluate the possible use of LRM-1 as a standard material. These include its composition, homogeneity, density, compressive strength, the Na leachability index with the ANSI/ANS 16.1 leach test, and if the glass is characteristically hazardous with the toxicity characteristic leach procedure. The values of these properties were within the acceptable limits identified for Hanford low-activity waste products. The reproducibility of replicate tests and analyses indicates that the glass would be a suitable standard material

  2. Testing self-regulation interventions to increase walking using factorial randomized N-of-1 trials.

    Science.gov (United States)

    Sniehotta, Falko F; Presseau, Justin; Hobbs, Nicola; Araújo-Soares, Vera

    2012-11-01

    To investigate the suitability of N-of-1 randomized controlled trials (RCTs) as a means of testing the effectiveness of behavior change techniques based on self-regulation theory (goal setting and self-monitoring) for promoting walking in healthy adult volunteers. A series of N-of-1 RCTs in 10 normal and overweight adults ages 19-67 (M = 36.9 years). We randomly allocated 60 days within each individual to text message-prompted daily goal-setting and/or self-monitoring interventions in accordance with a 2 (step-count goal prompt vs. alternative goal prompt) × 2 (self-monitoring: open vs. blinded Omron-HJ-113-E pedometer) factorial design. Aggregated data were analyzed using random intercept multilevel models. Single cases were analyzed individually. The primary outcome was daily pedometer step counts over 60 days. Single-case analyses showed that 4 participants significantly increased walking: 2 on self-monitoring days and 2 on goal-setting days, compared with control days. Six participants did not benefit from the interventions. In aggregated analyses, mean step counts were higher on goal-setting days (8,499.9 vs. 7,956.3) and on self-monitoring days (8,630.3 vs. 7,825.9). Multilevel analyses showed a significant effect of the self-monitoring condition (p = .01), the goal-setting condition approached significance (p = .08), and there was a small linear increase in walking over time (p = .03). N-of-1 randomized trials are a suitable means to test behavioral interventions in individual participants.

  3. e sup + e sup - Factories: PEP-II, KEKB, DAPHINE

    CERN Document Server

    Guiducci, S

    2001-01-01

    In 1999 two B-factories, PEP-II and KEK, and a PHI-factory, DAPHINE, started their physics experiments. A status report of the three factories is presented. A description of the interaction regions, strongly influenced by the detector requirements, and of the machine background in the detectors is presented.

  4. Acceptance Test Report for the Modular Automation System (MAS) Manufactured by Honeywell Inc

    International Nuclear Information System (INIS)

    ANDERSON, D.L.

    2000-01-01

    This document details the performance of the acceptance test of the Honeywell MAS Control System for equipment to be installed in gloveboxes HA-20MB and HA-211 at a later date. Equipment that was anticipated included 6 stabilization furnaces, only three and their associated equipment were installed

  5. HIV test offers and acceptance: New York State findings from the behavioral risk factor surveillance system and the National HIV behavioral surveillance, 2011-2012.

    Science.gov (United States)

    John Leung, Shu-Yin; Sinclair, Amber H; Battles, Haven B; Swain, Carol-Ann E; French, Patrick Tyler; Anderson, Bridget J; Sowizral, Mycroft J; Ruberto, Rachael; Brissette, Ian; Lillquist, Patricia; Smith, Lou C

    2015-01-01

    The New York State HIV testing law requires that patients aged 13-64 years be offered HIV testing in health care settings. We investigated the extent to which HIV testing was offered and accepted during the 24 months after law enactment. We added local questions to the Behavioral Risk Factor Surveillance System (BRFSS) and the National HIV Behavioral Surveillance (NHBS) surveys asking respondents aged 18-64 years whether they were offered an HIV test in health care settings, and whether they had accepted testing. Statewide prevalence estimates of test offers and acceptance were obtained from a combined 2011-2012 BRFSS sample (N = 6,223). Local estimates for 2 high-risk populations were obtained from NHBS 2011 men who have sex with men (N = 329) and 2012 injection drug users (N = 188) samples. BRFSS data showed that 73% of New Yorkers received care in any health care setting in the past 12 months, of whom 25% were offered an HIV test. Sixty percent accepted the test when offered. The levels of test offer increased from 20% to 29% over time, whereas acceptance levels decreased from 68% to 53%. NHBS data showed that 81% of men who have sex with men received care, of whom 43% were offered an HIV test. Eighty-eight percent accepted the test when offered. Eighty-five percent of injection drug users received care, of whom 63% were offered an HIV test, and 63% accepted the test when offered. We found evidence of partial and increasing implementation of the HIV testing law. Importantly, these studies demonstrated New Yorkers' willingness to accept an offered HIV test as part of routine care in health care settings.

  6. Implementing Clinical Research Using Factorial Designs: A Primer.

    Science.gov (United States)

    Baker, Timothy B; Smith, Stevens S; Bolt, Daniel M; Loh, Wei-Yin; Mermelstein, Robin; Fiore, Michael C; Piper, Megan E; Collins, Linda M

    2017-07-01

    Factorial experiments have rarely been used in the development or evaluation of clinical interventions. However, factorial designs offer advantages over randomized controlled trial designs, the latter being much more frequently used in such research. Factorial designs are highly efficient (permitting evaluation of multiple intervention components with good statistical power) and present the opportunity to detect interactions amongst intervention components. Such advantages have led methodologists to advocate for the greater use of factorial designs in research on clinical interventions (Collins, Dziak, & Li, 2009). However, researchers considering the use of such designs in clinical research face a series of choices that have consequential implications for the interpretability and value of the experimental results. These choices include: whether to use a factorial design, selection of the number and type of factors to include, how to address the compatibility of the different factors included, whether and how to avoid confounds between the type and number of interventions a participant receives, and how to interpret interactions. The use of factorial designs in clinical intervention research poses choices that differ from those typically considered in randomized clinical trial designs. However, the great information yield of the former encourages clinical researchers' increased and careful execution of such designs. Copyright © 2017. Published by Elsevier Ltd.

  7. Positron Factory project

    Energy Technology Data Exchange (ETDEWEB)

    Okada, Sohei; Sunaga, Hiromi; Kaneko, Hirohisa; Kawasuso, Atsuo; Masuno, Shin-ichi; Takizawa, Haruki; Yotsumoto, Keiichi [Japan Atomic Energy Research Inst., Takasaki, Gunma (Japan). Takasaki Radiation Chemistry Research Establishment

    1997-03-01

    We have started drafting a construction program for the Positron Factory, in which linac-based intense monoenergetic positron beams are planned to be applied for materials science, biotechnology and basic physics and chemistry. A technical survey study confirmed the feasibility of manufacturing a dedicated electron linac of 100 kW class with a beam energy of 100 MeV, which will produce a world-highest monoenergetic positron beam of more than 10{sup 10}/sec in intensity. A self-driven rotating converter (electrons to positrons and photons) suitable for the high power electron beam was devised and successfully tested. The practicability of simultaneous extraction of multi-channel monoenergetic positron beams with multiple moderator assemblies, which had been originated on the basis of a Monte Carlo simulation, was demonstrated by an experiment using an electron linac. An efficient moderator structure, which is composed of honeycomb-like assembled moderator foils and reflectors, is also proposed. (author)

  8. Usage and acceptability of HIV self-testing in men who have sex with men in Hong Kong.

    Science.gov (United States)

    Wong, Horas Tze Hoo; Tam, Hoi Yan; Chan, Denise Pui Chung; Lee, Shui Shan

    2015-03-01

    Whilst studies on over-the-counter HIV tests continue to accumulate after FDA's approval of OraQuick Advance in 2012, few have focused on men who have sex with men (MSM) in Asian cities. An internet survey was conducted on 1,122 MSM in Hong Kong, revealing a low usage (6.1 %) and acceptability rate (43.8 %) on self-testing despite its availability in the market. Hierarchical logistic regression models showed that having received relevant information and users' attitudes on self-testing were the determinants of usage and acceptability. These factors had greater effects than sexual behaviors and social-networking on MSM's decision on self-testing. Majority of ever self-testers only repeated the self-test after a non-negative result, and overall only 26.6 % went for a formal test subsequent to the self-test. Concerns regarding the tests' accuracy were expressed by respondents. In conclusion, appropriate and accessible information and evidence-based guidance are needed to incorporate self-testing into HIV prevention strategies targeting MSM.

  9. Scale Attitude toward Indebtedness: factorial validity and attitudinal profiles in Chilean university students [Escala de Actitudes hacia el Endeudamiento: validez factorial y perfiles actitudinales en estudiantes universitarios chilenos

    Directory of Open Access Journals (Sweden)

    Marianela Denegri Coria

    2012-06-01

    Full Text Available The number of university students who present an early indebtedness has increased in the last years, which represents a potential risk for his financial stability. This study examined validity factorial of the Scale of Attitudes toward the Indebtedness (Denegri et al., 1999 and determines the existence of profile attitudinal typology towards the indebtedness in a sample of 984 university Chilean students with ages between 18 and 25 years. The results indicate the presence of two independent factors named Hedonism and Aus- terity, from which four profiles of attitudes decided towards the indebtedness named: austere, diffuse, hedonistic and ambivalent those who might be to the base of his behaviors of acceptance or rejection of the indebtedness.

  10. Rare B decays at B factories

    International Nuclear Information System (INIS)

    Trabelsi, Karim

    2010-01-01

    Radiative and Electroweak Penguin Decays are Flavor Changing Neutral Currents (FCNC) occurring in the Standard Model only at the loop level. They are characterized by high sensitivity to New Physics (they can appear in the loop with size comparable to leading SM contributions) and they are Complementary to the direct production of new particles expected at LHC. Huge datasets collected at the two B- factories, BaBar and Belle, have made it possible to explore precisely these decays in exclusive channels and inclusive measurements. b →sγ, b→dγ, b→s l + l - , B + →τν, B→Dτν etc measured provide tests of SM predictions and interesting BSM constraints: Charged Higgs bounds from b →sγ, B + →τν, B + →Dτν; Constraints on Wilson coefficients C 7 , C 9 and C 10 ; and Constraints on |V td |/|V ts |. They provide interesting signatures: B(B + →τ + ν) direct measurement versus CKM fit; and large forward-backward asymmetry of K* l + l - . Final Belle/BaBar data samples are yet to be analyzed and even more interesting results are expected at Super B factories with two orders of magnitude larger data samples

  11. The physics of the B factories

    CERN Document Server

    Bevan, A J; Mannel, Th; Prell, S; Yabsley, B D; Abe, K; Aihara, H; Anulli, F; Arnaud, N; Aushev, T; Beneke, M; Beringer, J; Bianchi, F; Bigi, I I; Bona, M; Brambilla, N; Brodzicka, J; Chang, P; Charles, M J; Cheng, C H; Cheng, H -Y; Chistov, R; Colangelo, P; Coleman, J P; Drutskoy, A; Druzhinin, V P; Eidelman, S; Eigen, G; Eisner, A M; Faccini, R; Flood, K T; Gambino, P; Gaz, A; Gradl, W; Hayashii, H; Higuchi, T; Hulsbergen, W D; Hurth, T; Iijima, T; Itoh, R; Jackson, P D; Kass, R; Kolomensky, Yu G; Kou, E; Križan, P; Kronfeld, A; Kumano, S; Kwon, Y J; Latham, T E; Leith, D W G S; Lüth, V; Martinez-Vidal, F; Meadows, B T; Mussa, R; Nakao, M; Nishida, S; Ocariz, J; Olsen, S L; Pakhlov, P; Pakhlova, G; Palano, A; Pich, A; Playfer, S; Poluektov, A; Porter, F C; Robertson, S H; Roney, J M; Roodman, A; Sakai, Y; Schwanda, C; Schwartz, A J; Seidl, R; Sekula, S J; Steinhauser, M; Sumisawa, K; Swanson, E S; Tackmann, F; Trabelsi, K; Uehara, S; Uno, S; van der Water, R; Vasseur, G; Verkerke, W; Waldi, R; Wang, M Z; Wilson, F F; Zupan, J; Zupanc, A; Adachi, I; Albert, J; Banerjee, Sw; Ben-Haim, E; Biassoni, P; Cahn, R N; Cartaro, C; Chauveau, J; Chen, C; Chiang, C C; Cowan, R; Dalseno, J; Davier, M; Davies, C; Dingfelder, J C; Echenard, B; Epifanov, D; Fulsom, B G; Gabareen, A M; Gary, J W; Godang, R; Graham, M T; Hafner, A; Hamilton, B; Hartmann, T; Hayasaka, K; Hearty, C; Iwasaki, Y; Khodjamirian, A; Kusaka, A; Kuzmin, A; Lafferty, G D; Lazzaro, A; Li, J; Lindemann, D; Long, O; Lusiani, A; Marchiori, G; Martinelli, M; Miyabayashi, K; Mizuk, R; Mohanty, G B; Muller, D R; Nakazawa, H; Ongmongkolkul, P; Pacetti, S; Palombo, F; Pedlar, T K; Piilonen, L E; Pilloni, A; Poireau, V; Prothmann, K; Pulliam, T; Rama, M; Ratcliff, B N; Roudeau, P; Schrenk, S; Schroeder, T; Schubert, K R; Shen, C P; Shwartz, B; Soffer, A; Solodov, E P; Somov, A; Starič, M; Stracka, S; Telnov, A V; Todyshev, K Yu; Tsuboyama, T; Uglov, T; Vinokurova, A; Walsh, J J; Watanabe, Y; Won, E; Wormser, G; Wright, D H; Ye, S; Zhang, C C; Abachi, S; Abashian, A; Abe, N; Abe, R; Abe, T; Abrams, G S; Adam, I; Adamczyk, K; Adametz, A; Adye, T; Agarwal, A; Ahmed, H; Ahmed, M; Ahmed, S; Ahn, B S; Ahn, H S; Aitchison, I J R; Akai, K; Akar, S; Akatsu, M; Akemoto, M; Akhmetshin, R; Akre, R; Alam, M S; Albert, J N; Aleksan, R; Alexander, J P; Alimonti, G; Allen, M T; Allison, J; Allmendinger, T; Alsmiller, J R G; Altenburg, D; Alwyn, K E; An, Q; Anderson, J; Andreassen, R; Andreotti, D; Andreotti, M; Andress, J C; Angelini, C; Anipko, D; Anjomshoaa, A; Anthony, P L; Antillon, E A; Antonioli, E; Aoki, K; Arguin, J F; A, K; Arisaka, K; Asai, K; Asai, M; Asano, Y; Asgeirsson, D J; Asner, D M; Aso, T; Aspinwall, M L; Aston, D; Atmacan, H; Aubert, B; Aulchenko, V; Ayad, R; Azemoon, T; Aziz, T; Azzolini, V; Azzopardi, D E; Baak, M A; Back, J J; Bagnasco, S; Bahinipati, S; Bailey, D S; Bailey, S; Bailly, P; van Bakel, N; Bakich, A M; Bala, A; Balagura, V; Baldini-Ferroli, R; Ban, Y; Banas, E; Band, H R; Banerjee, S; Baracchini, E; Barate, R; Barberio, E; Barbero, M; Bard, D J; Barillari, T; Barlow, N R; Barlow, R J; Barrett, M; Bartel, W; Bartelt, J; Bartoldus, R; Batignani, G; Battaglia, M; Bauer, J M; Bay, A; Beaulieu, M; Bechtle, P; Beck, T W; Becker, J; Becla, J; Bedny, I; Behari, S; Behera, P K; Behn, E; Behr, L; Beigbeder, C; Beiline, D; Bell, R; Bellini, F; Bellis, M; Bellodi, G; Belous, K; Benayoun, M; Benelli, G; Benitez, J F; Benkebil, M; Berger, N; Bernabeu, J; Bernard, D; Bernet, R; Bernlochner, F U; Berryhill, J W; Bertsche, K; Besson, P; Best, D S; Bettarini, S; Bettoni, D; Bhardwaj, V; Bhimji, W; Bhuyan, B; Biagini, M E; Biasini, M; van Bibber, K; Biesiada, J; Bingham, I; Bionta, R M; Bischofberger, M; Bitenc, U; Bizjak, I; Blanc, F; Blaylock, G; Blinov, V E; Bloom, E; Bloom, P C; Blount, N L; Blouw, J; Bly, M; Blyth, S; Boeheim, C T; Bomben, M; Bondar, A; Bondioli, M; Bonneaud, G R; Bonvicini, G; Booke, M; Booth, J; Borean, C; Borgland, A W; Borsato, E; Bosi, F; Bosisio, L; Botov, A A; Bougher, J; Bouldin, K; Bourgeois, P; Boutigny, D; Bowerman, D A; Boyarski, A M; Boyce, R F; Boyd, J T; Bozek, A; Bozzi, C; Bračko, M; Brandenburg, G; Brandt, T; Brau, B; Brau, J; Breon, A B; Breton, D; Brew, C; Briand, H; Bright-Thomas, P G; Brigljević, V; Britton, D I; Brochard, F; Broomer, B; Brose, J; Browder, T E; Brown, C L; Brown, C M; Brown, D N; Browne, M; Bruinsma, M; Brunet, S; Bucci, F; Buchanan, C; Buchmueller, O L; Bünger, C; Bugg, W; Bukin, A D; Bula, R; Bulten, H; Burchat, P R; Burgess, W; Burke, J P; Button-Shafer, J; Buzykaev, A R; Buzzo, A; Cai, Y; Calabrese, R; Calcaterra, A; Calderini, G; Camanzi, B; Campagna, E; Campagnari, C; Capra, R; Carassiti, V; Carpinelli, M; Carroll, M; Casarosa, G; Casey, B C K; Cason, N M; Castelli, G; Cavallo, N; Cavoto, G; Cecchi, A; Cenci, R; Cerizza, G; Cervelli, A; Ceseracciu, A; Chai, X; Chaisanguanthum, K S; Chang, M C; Chang, Y H; Chang, Y W; Chao, D S; Chao, M; Chao, Y; Charles, E; Chavez, C A; Cheaib, R; Chekelian, V; Chen, A; Chen, E; Chen, G P; Chen, H F; Chen, J -H; Chen, J C; Chen, K F; Chen, P; Chen, S; Chen, W T; Chen, X; Chen, X R; Chen, Y Q; Cheng, B; Cheon, B G; Chevalier, N; Chia, Y M; Chidzik, S; Chilikin, K; Chistiakova, M V; Cizeron, R; Cho, I S; Cho, K; Chobanova, V; Choi, H H F; Choi, K S; Choi, S K; Choi, Y; Choi, Y K; Christ, S; Chu, P H; Chun, S; Chuvikov, A; Cibinetto, G; Cinabro, D; Clark, A R; Clark, P J; Clarke, C K; Claus, R; Claxton, B; Clifton, Z C; Cochran, J; Cohen-Tanugi, J; Cohn, H; Colberg, T; Cole, S; Colecchia, F; Condurache, C; Contri, R; Convert, P; Convery, M R; Cooke, P; Copty, N; Cormack, C M; Corso, F Dal; Corwin, L A; Cossutti, F; Cote, D; Ramusino, A Cotta; Cottingham, W N; Couderc, F; Coupal, D P; Covarelli, R; Cowan, G; Craddock, W W; Crane, G; Crawley, H B; Cremaldi, L; Crescente, A; Cristinziani, M; Crnkovic, J; Crosetti, G; Cuhadar-Donszelmann, T; Cunha, A; Curry, S; D'Orazio, A; Dû, S; Dahlinger, G; Dahmes, B; Dallapiccola, C; Danielson, N; Danilov, M; Das, A; Dash, M; Dasu, S; Datta, M; Daudo, F; Dauncey, P D; David, P; Davis, C L; Day, C T; De Mori, F; De Domenico, G; De Groot, N; De la Vaissière, C; de la Vaissière, Ch; de Lesquen, A; De Nardo, G; de Sangro, R; De Silva, A; DeBarger, S; Decker, F J; Sanchez, P del Amo; Del Buono, L; Del Gamba, V; del Re, D; Della Ricca, G; Denig, A G; Derkach, D; Derrington, I M; DeStaebler, H; Destree, J; Devmal, S; Dey, B; Di Girolamo, B; Di Marco, E; Dickopp, M; Dima, M O; Dittrich, S; Dittongo, S; Dixon, P; Dneprovsky, L; Dohou, F; Doi, Y; Doležal, Z; Doll, D A; Donald, M; Dong, L; Dong, L Y; Dorfan, J; Dorigo, A; Dorsten, M P; Dowd, R; Dowdell, J; Drásal, Z; Dragic, J; Drummond, B W; Dubitzky, R S; Dubois-Felsmann, G P; Dubrovin, M S; Duh, Y C; Duh, Y T; Dujmic, D; Dungel, W; Dunwoodie, W; Dutta, D; Dvoretskii, A; Dyce, N; Ebert, M; Eckhart, E A; Ecklund, S; Eckmann, R; Eckstein, P; Edgar, C L; Edwards, A J; Egede, U; Eichenbaum, A M; Elmer, P; Emery, S; Enari, Y; Enomoto, R; Erdos, E; Erickson, R; Ernst, J A; Erwin, R J; Escalier, M; Eschenburg, V; Eschrich, I; Esen, S; Esteve, L; Evangelisti, F; Everton, C W; Eyges, V; Fabby, C; Fabozzi, F; Fahey, S; Falbo, M; Fan, S; Fang, F; Fanin, C; Farbin, A; Farhat, H; Fast, J E; Feindt, M; Fella, A; Feltresi, E; Ferber, T; Fernholz, R E; Ferrag, S; Ferrarotto, F; Ferroni, F; Field, R C; Filippi, A; Finocchiaro, G; Fioravanti, E; da Costa, J Firmino; Fischer, P -A; Fisher, A; Fisher, P H; Flacco, C J; Flack, R L; Flaecher, H U; Flanagan, J; Flanigan, J M; Ford, K E; Ford, W T; Forster, I J; Forti, A C; Forti, F; Fortin, D; Foster, B; Foulkes, S D; Fouque, G; Fox, J; Franchini, P; Sevilla, M Franco; Franek, B; Frank, E D; Fransham, K B; Fratina, S; Fratini, K; Frey, A; Frey, R; Friedl, M; Fritsch, M; Fry, J R; Fujii, H; Fujikawa, M; Fujita, Y; Fujiyama, Y; Fukunaga, C; Fukushima, M; Fullwood, J; Funahashi, Y; Funakoshi, Y; Furano, F; Furman, M; Furukawa, K; Futterschneider, H; Gabathuler, E; Gabriel, T A; Gabyshev, N; Gaede, F; Gagliardi, N; Gaidot, A; Gaillard, J -M; Gaillard, J R; Galagedera, S; Galeazzi, F; Gallo, F; Gamba, D; Gamet, R; Gan, K K; Gandini, P; Ganguly, S; Ganzhur, S F; Gao, Y Y; Gaponenko, I; Garmash, A; Tico, J Garra; Garzia, I; Gaspero, M; Gastaldi, F; Gatto, C; Gaur, V; Geddes, N I; Geld, T L; Genat, J -F; George, K A; George, M; George, S; Georgette, Z; Gershon, T J; Gill, M S; Gillard, R; Gilman, J D; Giordano, F; Giorgi, M A; Giraud, P -F; Gladney, L; Glanzman, T; Glattauer, R; Go, A; Goetzen, K; Goh, Y M; Gokhroo, G; Goldenzweig, P; Golubev, V B; Gopal, G P; Gordon, A; Gorišek, A; Goriletsky, V I; Gorodeisky, R; Gosset, L; Gotow, K; Gowdy, S J; Graffin, P; Grancagnolo, S; Grauges, E; Graziani, G; Green, M G; Greene, M G; Grenier, G J; Grenier, P; Griessinger, K; Grillo, A A; Grinyov, B V; Gritsan, A V; Grosdidier, G; Perdekamp, M Grosse; Grosso, P; Grothe, M; Groysman, Y; Grünberg, O; Guido, E; Guler, H; Gunawardane, N J W; Guo, Q H; Guo, R S; Guo, Z J; Guttman, N; Ha, H; Ha, H C; Haas, T; Haba, J; Hachtel, J; Hadavand, H K; Hadig, T; Hagner, C; Haire, M; Haitani, F; Haji, T; Haller, G; Halyo, V; Hamano, K; Hamasaki, H; de Monchenault, G Hamel; Hamilton, J; Hamilton, R; Hamon, O; Han, B Y; Han, Y L; Hanada, H; Hanagaki, K; Handa, F; Hanson, J E; Hanushevsky, A; Hara, K; Hara, T; Harada, Y; Harrison, P F; Harrison, T J; Harrop, B; Hart, A J; Hart, P A; Hartfiel, B L; Harton, J L; Haruyama, T; Hasan, A; Hasegawa, Y; Hast, C; Hastings, N C; Hasuko, K; Hauke, A; Hawkes, C M; Hayashi, K; Hazumi, M; Hee, C; Heenan, E M; Heffernan, D; Held, T; Henderson, R; Henderson, S W; Hertzbach, S S; Hervé, S; Heß, M; Heusch, C A; Hicheur, A; Higashi, Y; Higasino, Y; Higuchi, I; Hikita, S; Hill, E J; Himel, T; Hinz, L; Hirai, T; Hirano, H; Hirschauer, J F; Hitlin, D G; Hitomi, N; Hodgkinson, M C; Höcker, A; Hoi, C T; Hojo, T; Hokuue, T; Hollar, J J; Hong, T M; Honscheid, K; Hooberman, B; Hopkins, D A; Horii, Y; Hoshi, Y; Hoshina, K; Hou, S; Hou, W S; Hryn'ova, T; Hsiung, Y B; Hsu, C L; Hsu, S C; Hu, H; Hu, T; Huang, H C; Huang, T J; Huang, Y C; Huard, Z; Huffer, M E; Hufnagel, D; Hung, T; Hutchcroft, D E; Hyun, H J; Ichizawa, S; Igaki, T; Igarashi, A; Igarashi, S; Igarashi, Y; Igonkina, O; Ikado, K; Ikeda, H; Ikeda, K; Ilic, J; Inami, K; Innes, W R; Inoue, Y; Ishikawa, A; Ishino, H; Itagaki, K; Itami, S; Itoh, K; Ivanchenko, V N; Iverson, R; Iwabuchi, M; Iwai, G; Iwai, M; Iwaida, S; Iwamoto, M; Iwasaki, H; Iwasaki, M; Iwashita, T; Izen, J M; Jackson, D J; Jackson, F; Jackson, G; Jackson, P S; Jacobsen, R G; Jacoby, C; Jaegle, I; Jain, V; Jalocha, P; Jang, H K; Jasper, H; Jawahery, A; Jayatilleke, S; Jen, C M; Jensen, F; Jessop, C P; Ji, X B; John, M J J; Johnson, D R; Johnson, J R; Jolly, S; Jones, M; Joo, K K; Joshi, N; Joshi, N J; Judd, D; Julius, T; Kadel, R W; Kadyk, J A; Kagan, H; Kagan, R; Kah, D H; Kaiser, S; Kaji, H; Kajiwara, S; Kakuno, H; Kameshima, T; Kaminski, J; Kamitani, T; Kaneko, J; Kang, J H; Kang, J S; Kani, T; Kapusta, P; Karbach, T M; Karolak, M; Karyotakis, Y; Kasami, K; Katano, G; Kataoka, S U; Katayama, N; Kato, E; Kato, Y; Kawai, H; Kawai, M; Kawamura, N; Kawasaki, T; Kay, J; Kay, M; Kelly, M P; Kelsey, M H; Kent, N; Kerth, L T; Khan, A; Khan, H R; Kharakh, D; Kibayashi, A; Kichimi, H; Kiesling, C; Kikuchi, M; Kikutani, E; Kim, B H; Kim, C H; Kim, D W; Kim, H; Kim, H J; Kim, H O; Kim, H W; Kim, J B; Kim, J H; Kim, K T; Kim, M J; Kim, P; Kim, S K; Kim, S M; Kim, T H; Kim, Y I; Kim, Y J; King, G J; Kinoshita, K; Kirk, A; Kirkby, D; Kitayama, I; Klemetti, M; Klose, V; Klucar, J; Knecht, N S; Knoepfel, K J; Knowles, D J; Ko, B R; Kobayashi, N; Kobayashi, S; Kobayashi, T; Kobel, M J; Koblitz, S; Koch, H; Kocian, M L; Kodyš, P; Koeneke, K; Kofler, R; Koike, S; Koishi, S; Koiso, H; Kolb, J A; Kolya, S D; Kondo, Y; Konishi, H; Koppenburg, P; Koptchev, V B; Kordich, T M B; Korol, A A; Korotushenko, K; Korpar, S; Kouzes, R T; Kovalskyi, D; Kowalewski, R; Kozakai, Y; Kozanecki, W; Kral, J F; Krasnykh, A; Krause, R; Kravchenko, E A; Krebs, J; Kreisel, A; Kreps, M; Krishnamurthy, M; Kroeger, R; Kroeger, W; Krokovny, P; Kronenbitter, B; Kroseberg, J; Kubo, T; Kuhr, T; Kukartsev, G; Kulasiri, R; Kulikov, A; Kumar, R; Kumar, S; Kumita, T; Kuniya, T; Kunze, M; Kuo, C C; Kuo, T -L; Kurashiro, H; Kurihara, E; Kurita, N; Kuroki, Y; Kurup, A; Kutter, P E; Kuznetsova, N; Kvasnička, P; Kyberd, P; Kyeong, S H; Lacker, H M; Lae, C K; Lamanna, E; Lamsa, J; Lanceri, L; Landi, L; Lang, M I; Lange, D J; Lange, J S; Langenegger, U; Langer, M; Lankford, A J; Lanni, F; Laplace, S; Latour, E; Lau, Y P; Lavin, D R; Layter, J; Lebbolo, H; LeClerc, C; Leddig, T; Leder, G; Diberder, F Le; Lee, C L; Lee, J; Lee, J S; Lee, M C; Lee, M H; Lee, M J; Lee, S -J; Lee, S E; Lee, S H; Lee, Y J; Lees, J P; Legendre, M; Leitgab, M; Leitner, R; Leonardi, E; Leonidopoulos, C; Lepeltier, V; Leruste, Ph; Lesiak, T; Levi, M E; Levy, S L; Lewandowski, B; Lewczuk, M J; Lewis, P; Li, H; Li, H B; Li, S; Li, X; Li, Y; Gioi, L Li; Libby, J; Lidbury, J; Lillard, V; Lim, C L; Limosani, A; Lin, C S; Lin, J Y; Lin, S W; Lin, Y S; Lindquist, B; Lindsay, C; Lista, L; Liu, C; Liu, F; Liu, H; Liu, H M; Liu, J; Liu, R; Liu, T; Liu, Y; Liu, Z Q; Liventsev, D; Vetere, M Lo; Locke, C B; Lockman, W S; Di Lodovico, F; Lombardo, V; London, G W; Pegna, D Lopes; Lopez, L; Lopez-March, N; Lory, J; LoSecco, J M; Lou, X C; Louvot, R; Lu, A; Lu, C; Lu, M; Lu, R S; Lueck, T; Luitz, S; Lukin, P; Lund, P; Luppi, E; Lutz, A M; Lutz, O; Lynch, G; Lynch, H L; Lyon, A J; Lyubinsky, V R; MacFarlane, D B; Mackay, C; MacNaughton, J; Macri, M M; Madani, S; Mader, W F; Majewski, S A; Majumder, G; Makida, Y; Malaescu, B; Malaguti, R; Malclès, J; Mallik, U; Maly, E; Mamada, H; Manabe, A; Mancinelli, G; Mandelkern, M; Mandl, F; Manfredi, P F; Mangeol, D J J; Manoni, E; Mao, Z P; Margoni, M; Marker, C E; Markey, G; Marks, J; Marlow, D; Marques, V; Marsiske, H; Martellotti, S; Martin, E C; Martin, J P; Martin, L; Martinez, A J; Marzolla, M; Mass, A; Masuzawa, M; Mathieu, A; Matricon, P; Matsubara, T; Matsuda, T; Matsumoto, H; Matsumoto, S; Matsumoto, T; Matsuo, H; Mattison, T S; Matvienko, D; Matyja, A; Mayer, B; Mazur, M A; Mazzoni, M A; McCulloch, M; McDonald, J; McFall, J D; McGrath, P; McKemey, A K; McKenna, J A; Mclachlin, S E; McMahon, S; McMahon, T R; McOnie, S; Medvedeva, T; Melen, R; Mellado, B; Menges, W; Menke, S; Merchant, A M; Merkel, J; Messner, R; Metcalfe, S; Metzler, S; Meyer, N T; Meyer, T I; Meyer, W T; Michael, A K; Michelon, G; Michizono, S; Micout, P; Miftakov, V; Mihalyi, A; Mikami, Y; Milanes, D A; Milek, M; Mimashi, T; Minamora, J S; Mindas, C; Minutoli, S; Mir, L M; Mishra, K; Mitaroff, W; Miyake, H; Miyashita, T S; Miyata, H; Miyazaki, Y; Moffitt, L C; Mohapatra, A; Mohapatra, A K; Mohapatra, D; Moll, A; Moloney, G R; Mols, J P; Mommsen, R K; Monge, M R; Monorchio, D; Moore, T B; Moorhead, G F; de Freitas, P Mora; Morandin, M; Morgan, N; Morgan, S E; Morganti, M; Morganti, S; Mori, S; Mori, T; Morii, M; Morris, J P; Morsani, F; Morton, G W; Moss, L J; Mouly, J P; Mount, R; Mueller, J; Müller-Pfefferkorn, R; Mugge, M; Muheim, F; Muir, A; Mullin, E; Munerato, M; Murakami, A; Murakami, T; Muramatsu, N; Musico, P; Nagai, I; Nagamine, T; Nagasaka, Y; Nagashima, Y; Nagayama, S; Nagel, M; Naisbit, M T; Nakadaira, T; Nakahama, Y; Nakajima, M; Nakajima, T; Nakamura, I; Nakamura, T; Nakamura, T T; Nakano, E; Nakayama, H; Nam, J W; Narita, S; Narsky, I; Nash, J A; Natkaniec, Z; Nauenberg, U; Nayak, M; Neal, H; Nedelkovska, E; Negrini, M; Neichi, K; Nelson, D; Nelson, S; Neri, N; Nesom, G; Neubauer, S; Newman-Coburn, D; Ng, C; Nguyen, X; Nicholson, H; Niebuhr, C; Nief, J Y; Niiyama, M; Nikolich, M B; Nisar, N K; Nishimura, K; Nishio, Y; Nitoh, O; Nogowski, R; Noguchi, S; Nomura, T; Nordby, M; Nosochkov, Y; Novokhatski, A; Nozaki, S; Nozaki, T; Nugent, I M; O'Grady, C P; O'Neale, S W; O'Neill, F G; Oberhof, B; Oddone, P J; Ofte, I; Ogawa, A; Ogawa, K; Ogawa, S; Ogawa, Y; Ohkubo, R; Ohmi, K; Ohnishi, Y; Ohno, F; Ohshima, T; Ohshima, Y; Ohuchi, N; Oide, K; Oishi, N; Okabe, T; Okazaki, N; Okazaki, T; Okuno, S; Olaiya, E O; Olivas, A; Olley, P; Olsen, J; Ono, S; Onorato, G; Onuchin, A P; Onuki, Y; Ooba, T; Orimoto, T J; Oshima, T; Osipenkov, I L; Ostrowicz, W; Oswald, C; Otto, S; Oyang, J; Oyanguren, A; Ozaki, H; Ozcan, V E; Paar, H P; Padoan, C; Paick, K; Palka, H; Pan, B; Pan, Y; Vazquez, W Panduro; Panetta, J; Panova, A I; Panvini, R S; Panzenböck, E; Paoloni, E; Paolucci, P; Pappagallo, M; Paramesvaran, S; Park, C S; Park, C W; Park, H; Park, H K; Park, K S; Park, W; Parry, R J; Parslow, N; Passaggio, S; Pastore, F C; Patel, P M; Patrignani, C; Patteri, P; Pavel, T; Pavlovich, J; Payne, D J; Peak, L S; Peimer, D R; Pelizaeus, M; Pellegrini, R; Pelliccioni, M; Peng, C C; Peng, J C; Peng, K C; Peng, T; Penichot, Y; Pennazzi, S; Pennington, M R; Penny, R C; Penzkofer, A; Perazzo, A; Perez, A; Perl, M; Pernicka, M; Perroud, J -P; Peruzzi, I M; Pestotnik, R; Peters, K; Peters, M; Petersen, B A; Petersen, T C; Petigura, E; Petrak, S; Petrella, A; Petrič, M; Petzold, A; Pia, M G; Piatenko, T; Piccolo, D; Piccolo, M; Piemontese, L; Piemontese, M; Pierini, M; Pierson, S; Pioppi, M; Piredda, G; Pivk, M; Plaszczynski, S; Polci, F; Pompili, A; Poropat, P; Posocco, M; Potter, C T; Potter, R J L; Prasad, V; Prebys, E; Prencipe, E; Prendki, J; Prepost, R; Prest, M; Prim, M; Pripstein, M; Prudent, X; Pruvot, S; Puccio, E M T; Purohit, M V; Qi, N D; Quinn, H; Raaf, J; Rabberman, R; Raffaelli, F; Ragghianti, G; Rahatlou, S; Rahimi, A M; Rahmat, R; Rakitin, A Y; Randle-Conde, A; Rankin, P; Rashevskaya, I; Ratkovsky, S; Raven, G; Re, V; Reep, M; Regensburger, J J; Reidy, J; Reif, R; Reisert, B; Renard, C; Renga, F; Ricciardi, S; Richman, J D; Ritchie, J L; Ritter, M; Rivetta, C; Rizzo, G; Roat, C; Robbe, P; Roberts, D A; Robertson, A I; Robutti, E; Rodier, S; Rodriguez, D M; Rodriguez, J L; Rodriguez, R; Roe, N A; Röhrken, M; Roethel, W; Rolquin, J; Romanov, L; Romosan, A; Ronan, M T; Rong, G; Ronga, F J; Roos, L; Root, N; Rosen, M; Rosenberg, E I; Rossi, A; Rostomyan, A; Rotondo, M; Roussot, E; Roy, J; Rozanska, M; Rozen, Y; Rubin, A E; Ruddick, W O; Ruland, A M; Rybicki, K; Ryd, A; Ryu, S; Ryuko, J; Sabik, S; Sacco, R; Saeed, M A; Tehrani, F Safai; Sagawa, H; Sahoo, H; Sahu, S; Saigo, M; Saito, T; Saitoh, S; Sakai, K; Sakamoto, H; Sakaue, H; Saleem, M; Salnikov, A A; Salvati, E; Salvatore, F; Samuel, A; Sanders, D A; Sanders, P; Sandilya, S; Sandrelli, F; Sands, W; Sands, W R; Sanpei, M; Santel, D; Santelj, L; Santoro, V; Santroni, A; Sanuki, T; Sarangi, T R; Saremi, S; Sarti, A; Sasaki, T; Sasao, N; Satapathy, M; Sato, Nobuhiko; Sato, Noriaki; Sato, Y; Satoyama, N; Satpathy, A; Savinov, V; Savvas, N; Saxton, O H; Sayeed, K; Schaffner, S F; Schalk, T; Schenk, S; Schieck, J R; Schietinger, T; Schilling, C J; Schindler, R H; Schmid, S; Schmitz, R E; Schmuecker, H; Schneider, O; Schnell, G; Schönmeier, P; Schofield, K C; Schott, G; Schröder, H; Schram, M; Schubert, J; Schümann, J; Schultz, J; Schumm, B A; Schune, M H; Schwanke, U; Schwarz, H; Schwiening, J; Schwierz, R; Schwitters, R F; Sciacca, C; Sciolla, G; Scott, I J; Seeman, J; Seiden, A; Seitz, R; Seki, T; Sekiya, A I; Semenov, S; Semmler, D; Sen, S; Senyo, K; Seon, O; Serbo, V V; Serednyakov, S I; Serfass, B; Serra, M; Serrano, J; Settai, Y; Seuster, R; Sevior, M E; Shakhova, K V; Shang, L; Shapkin, M; Sharma, V; Shebalin, V; Shelkov, V G; Shen, B C; Shen, D Z; Shen, Y T; Sherwood, D J; Shibata, T; Shibata, T A; Shibuya, H; Shidara, T; Shimada, K; Shimoyama, M; Shinomiya, S; Shiu, J G; Shorthouse, H W; Shpilinskaya, L I; Sibidanov, A; Sicard, E; Sidorov, A; Sidorov, V; Siegle, V; Sigamani, M; Simani, M C; Simard, M; Simi, G; Simon, F; Simonetto, F; Sinev, N B; Singh, H; Singh, J B; Sinha, R; Sitt, S; Skovpen, Yu I; Sloane, R J; Smerkol, P; Smith, A J S; Smith, D; Smith, D S; Smith, J G; Smol, A; Snoek, H L; Snyder, A; So, R Y; Sobie, R J; Soderstrom, E; Soha, A; Sohn, Y S; Sokoloff, M D; Sokolov, A; Solagna, P; Solovieva, E; Soni, N; Sonnek, P; Sordini, V; Spaan, B; Spanier, S M; Spencer, E; Speziali, V; Spitznagel, M; Spradlin, P; Staengle, H; Stamen, R; Stanek, M; Stanič, S; Stark, J; Steder, M; Steininger, H; Steinke, M; Stelzer, J; Stevanato, E; Stocchi, A; Stock, R; Stoeck, H; Stoker, D P; Stroili, R; Strom, D; Strother, P; Strube, J; Stugu, B; Stypula, J; Su, D; Suda, R; Sugahara, R; Sugi, A; Sugimura, T; Sugiyama, A; Suitoh, S; Sullivan, M K; Sumihama, M; Sumiyoshi, T; Summers, D J; Sun, L; Sun, S; Sundermann, J E; Sung, H F; Susaki, Y; Sutcliffe, P; Suzuki, A; Suzuki, J; Suzuki, J I; Suzuki, K; Suzuki, S; Suzuki, S Y; Swain, J E; Swain, S K; T'Jampens, S; Tabata, M; Tackmann, K; Tajima, H; Tajima, O; Takahashi, K; Takahashi, S; Takahashi, T; Takasaki, F; Takayama, T; Takita, M; Tamai, K; Tamponi, U; Tamura, N; Tan, N; Tan, P; Tanabe, K; Tanabe, T; Tanaka, H A; Tanaka, J; Tanaka, M; Tanaka, S; Tanaka, Y; Tanida, K; Taniguchi, N; Taras, P; Tasneem, N; Tatishvili, G; Tatomi, T; Tawada, M; Taylor, F; Taylor, G N; Taylor, G P; Telnov, V I; Teodorescu, L; Ter-Antonyan, R; Teramoto, Y; Teytelman, D; Thérin, G; Thiebaux, Ch; Thiessen, D; Thomas, E W; Thompson, J M; Thorne, F; Tian, X C; Tibbetts, M; Tikhomirov, I; Tinslay, J S; Tiozzo, G; Tisserand, V; Tocut, V; Toki, W H; Tomassini, E W; Tomoto, M; Tomura, T; Torassa, E; Torrence, E; Tosi, S; Touramanis, C; Toussaint, J C; Tovey, S N; Trapani, P P; Treadwell, E; Triggiani, G; Trincaz-Duvoid, S; Trischuk, W; Troost, D; Trunov, A; Tsai, K L; Tsai, Y T; Tsujita, Y; Tsukada, K; Tsukamoto, T; Tuggle, J M; Tumanov, A; Tung, Y W; Turnbull, L; Turner, J; Turri, M; Uchida, K; Uchida, M; Uchida, Y; Ueki, M; Ueno, K; Ujiie, N; Ulmer, K A; Unno, Y; Urquijo, P; Ushiroda, Y; Usov, Y; Usseglio, M; Usuki, Y; Uwer, U; Va'vra, J; Vahsen, S E; Vaitsas, G; Valassi, A; Vallazza, E; Vallereau, A; Vanhoefer, P; van Hoek, W C; Van Hulse, C; van Winkle, D; Varner, G; Varnes, E W; Varvell, K E; Vasileiadis, G; Velikzhanin, Y S; Verderi, M; Versillé, S; Vervink, K; Viaud, B; Vidal, P B; Villa, S; Villanueva-Perez, P; Vinograd, E L; Vitale, L; Vitug, G M; Voß, C; Voci, C; Voena, C; Volk, A; von Wimmersperg-Toeller, J H; Vorobyev, V; Vossen, A; Vuagnin, G; Vuosalo, C O; Wacker, K; Wagner, A P; Wagner, D L; Wagner, G; Wagner, M N; Wagner, S R; Wagoner, D E; Walker, D; Walkowiak, W; Wallom, D; Wang, C C; Wang, C H; Wang, J; Wang, J G; Wang, K; Wang, L; Wang, L L; Wang, P; Wang, T J; Wang, W F; Wang, X L; Wang, Y F; Wappler, F R; Watanabe, M; Watson, A T; Watson, J E; Watson, N K; Watt, M; Weatherall, J H; Weaver, M; Weber, T; Wedd, R; Wei, J T; Weidemann, A W; W, A J R; Wenzel, W A; West, C A; West, C G; West, T J; White, R M; Wicht, J; Widhalm, L; Wiechczynski, J; Wienands, U; Wilden, L; Wilder, M; Williams, D C; Williams, G; Williams, J C; Williams, K M; Williams, M I; Willocq, S Y; Wilson, J R; Wilson, M G; Wilson, R J; Winklmeier, F; Winter, M A; Wisniewski, W J; Wittgen, M; Wittlin, J; Wittmer, W; Wixted, R; Woch, A; Wogsland, B J; Wong, Q K; Wray, B C; Wren, A C; Wright, D M; Wu, C H; Wu, J; Wu, S L; Wulsin, H W; Xella, S M; Xie, Q L; Xie, Y; Xu, Z Z; Yèche, Ch; Yamada, Y; Yamaga, M; Yamaguchi, A; Yamaguchi, H; Yamaki, T; Yamamoto, H; Yamamoto, N; Yamamoto, R K; Yamamoto, S; Yamanaka, T; Yamaoka, H; Yamaoka, J; Yamaoka, Y; Yamashita, Y; Yamauchi, M; Yan, D S; Yan, Y; Yanai, H; Yanaka, S; Yang, H; Yang, R; Yang, S; Yarritu, A K; Yashchenko, S; Yashima, J; Yasin, Z; Yasu, Y; Ye, S W; Yeh, P; Yi, J I; Yi, K; Yi, M; Yin, Z W; Ying, J; Yocky, G; Yokoyama, K; Yokoyama, M; Yokoyama, T; Yoshida, K; Yoshida, M; Yoshimura, Y; Young, C C; Yu, C X; Yu, Z; Yuan, C Z; Yuan, Y; Yumiceva, F X; Yusa, Y; Yushkov, A N; Yuta, H; Zacek, V; Zain, S B; Zallo, A; Zambito, S; Zander, D; Zang, S L; Zanin, D; Zaslavsky, B G; Zeng, Q L; Zghiche, A; Zhang, B; Zhang, J; Zhang, L; Zhang, L M; Zhang, S Q; Zhang, Z P; Zhao, H W; Zhao, M; Zhao, Z G; Zheng, Y; Zheng, Y H; Zheng, Z P; Zhilich, V; Zhou, P; Zhu, R Y; Zhu, Y S; Zhu, Z M; Zhulanov, V; Ziegler, T; Ziegler, V; Zioulas, G; Zisman, M; Zito, M; Zürcher, D; Zwahlen, N; Zyukova, O; Živko, T; Žontar, D; Bevan, Adrian; Golob, Bostjan; Mannel, Thomas; Prell, Soeren; Yabsley, Bruce

    2014-01-01

    This work is on the Physics of the B Factories. Part A of this book contains a brief description of the SLAC and KEK B Factories as well as their detectors, BaBar and Belle, and data taking related issues. Part B discusses tools and methods used by the experiments in order to obtain results. The results themselves can be found in Part C.

  12. Acceptance test procedure for K basins dose reduction project clean and coat equipment

    International Nuclear Information System (INIS)

    Creed, R.F.

    1996-01-01

    This document is the Acceptance Test Procedure (ATP) for the clean and coat equipment designed by Oceaneering Hanford, Inc. under purchase order MDK-XVC-406988 for use in the 105 K East Basin. The ATP provides the guidelines and criteria to test the equipment's ability to clean and coat the concrete perimeter, divider walls, and dummy elevator pit above the existing water level. This equipment was designed and built in support of the Spent Nuclear Fuel, Dose Reduction Project. The ATP will be performed at the 305 test facility in the 300 Area at Hanford. The test results will be documented in WHC-SD-SNF-ATR-020

  13. Is it acceptable to approach colorectal cancer patients at diagnosis to discuss genetic testing? A pilot study

    OpenAIRE

    Porteous, M; Dunckley, M; Appleton, S; Catt, S; Dunlop, M; Campbell, H; Cull, A

    2003-01-01

    In this pilot study, the acceptability of approaching 111 newly diagnosed colorectal cancer patients with the offer of genetic testing for hereditary nonpolyposis colorectal cancer (HNPCC) was assessed. A total of 78% of participants found it highly acceptable to have the information about HNPCC brought to their attention at that time.

  14. Acceptance criteria for reprocessed AcuNav catheters: comparison between functionality testing and clinical image assessment.

    Science.gov (United States)

    Bank, Alan J; Berry, James M; Wilson, Robert F; Lester, Bruce R

    2009-03-01

    The AcuNav-catheter is a vector-phased array ultrasound catheter that has shown great utility for both diagnosis and electrophysiological interventions. To test the feasibility of limited catheter reuse and to ensure that reprocessed catheters would produce acceptable clinical images, the present study compared the 2-D and Doppler image quality, as determined by clinical assessment, with the catheter's functional status as determined by the FirstCall 2000 transducer tester. Reprocessed catheters from four functional categories, two acceptable and two unacceptable, were used to collect images, 2-D and Doppler, from a porcine heart. The images were blinded and then rated by clinical evaluation. The study found that catheter images from all functional categories were found to be clinically acceptable except for those from the lowest unacceptable category. In addition, examination of tip deflection characteristics showed no significant difference between new and reprocessed catheters. We conclude that reprocessed AcuNav catheters that pass functional tests are able to produce clinical images, 2-D and Doppler, which are equivalent to their new counterparts.

  15. Three-dimensional structure of Rubella virus factories

    International Nuclear Information System (INIS)

    Fontana, Juan; Lopez-Iglesias, Carmen; Tzeng, Wen-Ping; Frey, Teryl K.; Fernandez, Jose J.; Risco, Cristina

    2010-01-01

    Viral factories are complex structures in the infected cell where viruses compartmentalize their life cycle. Rubella virus (RUBV) assembles factories by recruitment of rough endoplasmic reticulum (RER), mitochondria and Golgi around modified lysosomes known as cytopathic vacuoles or CPVs. These organelles contain active replication complexes that transfer replicated RNA to assembly sites in Golgi membranes. We have studied the structure of RUBV factory in three dimensions by electron tomography and freeze-fracture. CPVs contain stacked membranes, rigid sheets, small vesicles and large vacuoles. These membranes are interconnected and in communication with the endocytic pathway since they incorporate endocytosed BSA-gold. RER and CPVs are coupled through protein bridges and closely apposed membranes. Golgi vesicles attach to the CPVs but no tight contacts with mitochondria were detected. Immunogold labelling confirmed that the mitochondrial protein p32 is an abundant component around and inside CPVs where it could play important roles in factory activities.

  16. Loss on Ignition Furnace Acceptance and Operability Test Procedure

    International Nuclear Information System (INIS)

    JOHNSTON, D.C.

    2000-01-01

    The purpose of this Acceptance Test Procedure and Operability Test Procedure (ATP/OTP)is to verify the operability of newly installed Loss on Ignition (LOI) equipment, including a model 1608FL CMTM Furnace, a dessicator, and balance. The operability of the furnace will be verified. The arrangement of the equipment placed in Glovebox 157-3/4 to perform LOI testing on samples supplied from the Thermal Stabilization line will be verified. In addition to verifying proper operation of the furnace, this ATP/OTP will also verify the air flow through the filters, verify a damper setting to establish and maintain the required differential pressure between the glovebox and the room pressure, and test the integrity of the newly installed HEPA filter. In order to provide objective evidence of proper performance of the furnace, the furnace must heat 15 crucibles, mounted on a crucible rack, to 1000 C, according to a program entered into the furnace controller located outside the glovebox. The glovebox differential pressure will be set to provide the 0.5 to 2.0 inches of water (gauge) negative pressure inside the glovebox with an expected airflow of 100 to 125 cubic feet per minute (cfm) through the inlet filter. The glovebox inlet G1 filter will be flow tested to ensure the integrity of the filter connections and the efficiency of the filter medium. The newly installed windows and glovebox extension, as well as all disturbed joints, will be sonically tested via ultra probe to verify no leaks are present. The procedure for DOS testing of the filter is found in Appendix A

  17. Acceptance testing and commissioning of Kodak Directview CR-850 digital radiography system.

    Science.gov (United States)

    Bezak, E; Nelligan, R A

    2006-03-01

    This Technical Paper describes Acceptance Testing and Commissioning of the Kodak DirectView CR-850 digital radiography system installed at the Royal Adelaide Hospital. The first of its type installed in Australia, the system is a "dry" image processor, for which no chemicals are required to develop images. Rather, latent radiographic images are stored on photostimulable phosphor screens, which are scanned and displayed by a reader unit. The image can be digitally processed and enhanced before it is forwarded to a storage device, printer or workstation display, thereby alleviating the need to re-expose patients to achieve satisfactory quality images. The phosphor screens are automatically erased, ready for re-use. Results are reported of tests carried out using the optional "Total Quality Tool" quality assurance package installed with the system. This package includes analysis and reporting software which provides for simple testing and reporting of many important characteristics of the system, such as field uniformity, aspect ratio, line and pixel positions, image and system noise, exposure response, scan linearity, modulation transfer function (MTF) and image artefacts. Acceptance Tests were performed for kV and MV exposures. Resolution for MV exposures was at least 0.8 l/mm, and measured phantom dimensions were within 1.05% of expected magnification. Reproducibility between cassettes was within 1.6%. The mean pixel values on the central axis were close to linear for MV exposures from 3 to 10 MU and reached saturation level at around 20 MU for 6 MV and around 30 MV for 23 MV beams. Noise levels were below 0.2 %.

  18. R and D Toward Neutrino Factories and Muon Colliders

    International Nuclear Information System (INIS)

    Zisman, Michael S.

    2003-01-01

    R and D aimed at the production, acceleration, and storage of intense muon beams is under way in the U.S., in Europe, and in Japan. Considerable progress has been made in the past few years toward the design of a ''Neutrino Factory'' in which a beam of 20-50 GeV mu- or mu+ is stored. Decay neutrinos from the beam illuminate a detector located roughly 3000 km from the ring. Here, we briefly describe the ingredients of a Neutrino Factory and then discuss the current R and D program and its results. A key concept in the design is ''ionization cooling,'' a process whereby the muon emittance is reduced by repeated interactions with an absorber material followed by reacceleration with high-gradient rf cavities. Plans to test this concept in the Muon Ionization Cooling Experiment (MICE) are well along and are described briefly

  19. B-factory detectors

    International Nuclear Information System (INIS)

    Marlow, D.R.

    2002-01-01

    The designs of the recently commissioned BaBar and Belle B-Factory detectors are described. The discussion is organized around the methods and instruments used to detect the so-called gold-plated-mode B 0 →J/ΨK S decays and related modes

  20. INDOOR THERMAL CONDITION OF FACTORY BUILDING IN BANGLADESH

    OpenAIRE

    Muhammed Abdullah Al Sayem Khan; Mohd. Hamdan Ahmad; Tareef Hayat Khan

    2011-01-01

    Bangladesh is a developing country and has a lot of factories for different products for local use and also export to abroad. Garments industries are one of the top most items of exported items. A huge number of populations are working in garments industries. But these factories are not well designed in sense of the thermal environment. Workers experiences sickness related to indoor environment. The productions of these factories are affected due to employees’ health condition. The research i...

  1. TRIUMF kaon factory plans

    International Nuclear Information System (INIS)

    Blackmore, E.W.

    1983-01-01

    A progress report on the TRIUMF Kaon Factory Feasibility Study is presented. The requirements placed on the machine parameters and experimental facilities by the potentially interesting experiments are discussed

  2. TRIUMF kaon factory plans

    International Nuclear Information System (INIS)

    Blackmore, E.W.

    1982-11-01

    A progress report on the TRIUMF Kaon Factory Feasibility Study is presented. The requirements placed on the machine parameters and experimental facilities by the potentially interesting experiments are discussed

  3. An Interactive Simulation Tool for Production Planning in Bacon Factories

    DEFF Research Database (Denmark)

    Nielsen, Jens Frederik Dalsgaard; Nielsen, Kirsten Mølgaard

    1994-01-01

    The paper describes an interactive simulation tool for production planning in bacon factories. The main aim of the tool is to make it possible to combine the production plans of all parts of the factory......The paper describes an interactive simulation tool for production planning in bacon factories. The main aim of the tool is to make it possible to combine the production plans of all parts of the factory...

  4. Home-based voluntary HIV counselling and testing found highly acceptable and to reduce inequalities

    Directory of Open Access Journals (Sweden)

    Michelo Charles

    2010-06-01

    Full Text Available Abstract Background Low uptake of voluntary HIV counselling and testing (VCT in sub-Saharan Africa is raising acceptability concerns which might be associated with ways by which it is offered. We investigated the acceptability of home-based delivery of counselling and HIV testing in urban and rural populations in Zambia where VCT has been offered mostly from local clinics. Methods A population-based HIV survey was conducted in selected communities in 2003 (n = 5035. All participants stating willingness to be HIV tested were offered VCT at home and all counselling was conducted in the participants' homes. In the urban area post-test counselling and giving of results were done the following day whereas in rural areas this could take 1-3 weeks. Results Of those who indicated willingness to be HIV tested, 76.1% (95%CI 74.9-77.2 were counselled and received the test result. Overall, there was an increase in the proportion ever HIV tested from 18% before provision of home-based VCT to 38% after. The highest increase was in rural areas; among young rural men aged 15-24 years up from 14% to 42% vs. for urban men from 17% to 37%. Test rates by educational attainment changed from being positively associated to be evenly distributed after home-based VCT. Conclusions A high uptake was achieved by delivering HIV counselling and testing at home. The highest uptakes were seen in rural areas, in young people and groups with low educational attainment, resulting in substantial reductions in existing inequalities in accessing VCT services.

  5. 46 CFR 159.007-7 - Application for acceptance for production inspections and tests: Coast Guard action.

    Science.gov (United States)

    2010-10-01

    ... and tests: Coast Guard action. 159.007-7 Section 159.007-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL....007-7 Application for acceptance for production inspections and tests: Coast Guard action. (a) From...

  6. 1 Patient acceptability and feasibility of HIV testing in emergency departments in the UK - a systematic review and meta-analysis.

    Science.gov (United States)

    Lungu, Nicola

    2017-12-01

    NICE 2016 HIV testing guidelines now include the recommendation to offer HIV testing in Emergency Departments, in areas of high prevalence, 1 to everyone who is undergoing blood tests. 23% of England's local authorities are areas of high HIV prevalence (>2/1000) and are therefore eligible. 2 So far very few Emergency Departments have implemented routine HIV testing. This systematic review assesses evidence for two implementation considerations: patient acceptability (how likely a patient will accept an HIV test when offered in an Emergency Department), and feasibility, which incorporates staff training and willingness, and department capacity, (how likely Emergency Department staff will offer an HIV test to an eligible patient), both measured by surrogate quantitative markers. Three medical databases were systematically searched for reports of non-targeted HIV testing in UK Emergency Departments. A total of 1584 unique papers were found, 9 full text articles were critically appraised, and 7 studies included in meta-analysis. There is a combined patient sample of 1 01 975. The primary outcome, patient acceptability of HIV testing in Emergency Departments (number of patients accepting an HIV test, as a proportion of those offered) is 54.1% (CI 40.1, 68.2). Feasibility (number of tests offered, as a proportion of eligible patients) is 36.2% (CI 9.8, 62.4). For an Emergency Department considering introducing routine HIV testing, this review suggests an opt-out publicity-lead strategy. Utilising oral fluid and blood tests would lead to the greatest proportion of eligible patients accepting an HIV test. For individual staff who are consenting patients for HIV testing, it may be encouraging to know that there is >50% chance the patient will accept an offer of testing.emermed;34/12/A860-a/T1F1T1Table 1Summary table of data extracted from final 7 studies, with calculated acceptability and feasibility if appropriate, and GRADE score. Studies listed in chronological

  7. Pulmonary functions in plastic factory workers: a preliminary study.

    Science.gov (United States)

    Khaliq, Farah; Singh, Pawan; Chandra, Prakash; Gupta, Keshav; Vaney, Neelam

    2011-01-01

    Exposure to long term air pollution in the work environment may result in decreased lung functions and various other health problems. A significant occupational hazard to lung functions is experienced by plastic factory workers. The present study is planned to assess the pulmonary functions of workers in the plastic factory where recycling of pastic material was done. These workers were constantly exposed to fumes of various chemicals throughout the day. Thirty one workers of plastic factory were assessed for their pulmonary functions. Parameters were compared with 31 age and sex matched controls not exposed to the same environment. The pulmonary function tests were done using Sibelmed Datospir 120 B portable spirometer. A significant decrease in most of the flow rates (MEF 25%, MEF 50%, MEF 75% and FEF 25-75%) and most of the lung volumes and capacities (FVC, FEV1, VC, TV, ERV, MVV) were observed in the workers. Smoking and duration of exposure were not affecting the lung functions as the non smokers also showed a similar decrement in pulmonary functions. Similarly the workers working for less than 5 years also had decrement in pulmonary functions indicating that their lungs are being affected even if they have worked for one year. Exposure to the organic dust in the work environment should be controlled by adequate engineering measures, complemented by effective personal respiratory protection.

  8. Diagnostic accuracy and acceptability of rapid HIV oral testing among adults attending an urban public health facility in Kampala, Uganda.

    Directory of Open Access Journals (Sweden)

    Joanita Nangendo

    Full Text Available The prevalence of HIV in Uganda is 7.3%, and yet nearly 40% of people living with HIV are unaware of their status. The current HIV testing policy which is strictly blood-based poses several challenges including: a need for high level laboratory skills, stringent waste disposal needs, and painful sample collection. It is envisaged that introduction of a rapid, painless HIV oral fluid test as a potential alternative is likely to increase the number of people testing. The aim of this study was to determine the diagnostic accuracy and acceptability of rapid HIV oral testing among adults attending Kisenyi Health Centre IV in Kampala.We conducted a cross-sectional study among 440 adults recruited consecutively at Kisenyi Health Centre IV from January to March 2016. The diagnostic accuracy of the HIV oral test was assessed by comparing to the national HIV serial testing algorithm. We also assessed for acceptability among patients and health care workers (HCWs by triangulating responses from a structured questionnaire, three focus group discussions and seven key informant interviews. Acceptability was defined as willingness to take the test at the time of the study and intention for future use of the test if it was availed. The prevalence of HIV infection among study participants was 14.8%. The HIV oral fluid test was highly accurate with sensitivity of 100% (95% CI; 94.5-100.0, specificity of 100% (95% CI; 99.0-100.0, positive predictive value (PPV of 100% (95% CI; 94.5-100.0 and negative predictive value (NPV of 100% (95% CI; 99.0-100.0. Acceptability of HIV oral testing was also high at 87.0% (95% CI; 83.6-89.9. Participants preferred HIV oral testing because it was: pain free (91%, n = 399 and did not require blood draw (82%, n = 360.The HIV oral fluid test has high diagnostic accuracy and acceptability. HIV oral testing is a suitable addition to the national HIV testing strategies with the potential of increasing access to HIV testing services in

  9. Photon Factory activity report, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    The Photon Factory at the National Laboratory for High Energy Physics is a national facility for scientific research utilizing synchrotron radiation. Although the Photon Factory operator the linear injector, two light sources including the 2.5 GeV storage ring and the 6.5 GeV TRISTAN accumulation Ring as well as a major fraction of their beamlines and experimental station. This report is covered the period from October 1994 to September 1995. The total number of proposals by this PAC was 399 in 1995. Facility development projects currently in progress include the following, TRISTAN Super Light Facility (TSLF) project, VUV-FEL project, KEKB project and Slow-positron Source. This report contents outline of the Photon Factory, introduction, scientific disciplines, electronic properties of condensed matters, atomic and molecular science, X-ray imaging, radiobiology using synchrotron radiation, structural properties of condensed matters, structural properties of solid surfaces and adsorbates, structure and function of proteins, theoretical researches, experimental facilities, beamlines, new instrumentation, AR Upgrade, collaborations, projects, user`s short reports, list of published papers 1994/95. (S.Y.)

  10. Photon Factory activity report, 1995

    International Nuclear Information System (INIS)

    1996-01-01

    The Photon Factory at the National Laboratory for High Energy Physics is a national facility for scientific research utilizing synchrotron radiation. Although the Photon Factory operator the linear injector, two light sources including the 2.5 GeV storage ring and the 6.5 GeV TRISTAN accumulation Ring as well as a major fraction of their beamlines and experimental station. This report is covered the period from October 1994 to September 1995. The total number of proposals by this PAC was 399 in 1995. Facility development projects currently in progress include the following, TRISTAN Super Light Facility (TSLF) project, VUV-FEL project, KEKB project and Slow-positron Source. This report contents outline of the Photon Factory, introduction, scientific disciplines, electronic properties of condensed matters, atomic and molecular science, X-ray imaging, radiobiology using synchrotron radiation, structural properties of condensed matters, structural properties of solid surfaces and adsorbates, structure and function of proteins, theoretical researches, experimental facilities, beamlines, new instrumentation, AR Upgrade, collaborations, projects, user's short reports, list of published papers 1994/95. (S.Y.)

  11. Photon Factory activity report, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    The Photon Factory at the National Laboratory for High Energy Physics is a national facility for scientific research utilizing synchrotron radiation. Although the Photon Factory operator the linear injector, two light sources including the 2.5 GeV storage ring and the 6.5 GeV TRISTAN accumulation Ring as well as a major fraction of their beamlines and experimental station. This report is covered the period from October 1994 to September 1995. The total number of proposals by this PAC was 399 in 1995. Facility development projects currently in progress include the following, TRISTAN Super Light Facility (TSLF) project, VUV-FEL project, KEKB project and Slow-positron Source. This report contents outline of the Photon Factory, introduction, scientific disciplines, electronic properties of condensed matters, atomic and molecular science, X-ray imaging, radiobiology using synchrotron radiation, structural properties of condensed matters, structural properties of solid surfaces and adsorbates, structure and function of proteins, theoretical researches, experimental facilities, beamlines, new instrumentation, AR Upgrade, collaborations, projects, user`s short reports, list of published papers 1994/95. (S.Y.)

  12. DEVELOPMENT OF LAW RELATING TO FACTORIES IN INDIA

    Directory of Open Access Journals (Sweden)

    M. K. Sahu

    2015-01-01

    Full Text Available The rapid growth of industrial town and factories has paved the way to develop our industrial legislation accordingly. The Government of India never expressed their interest in framing separate legislation vis-à-vis factories which resulted in implementation of the same statute which was enacted pre-independence. It was done by virtue of Art. 372 of the Constitution of India. However, the Constitutional Lawmakers created vacuum for the implementation of new statute in accordance with the demand of society by inserting scope under the Directive Principles of State Policies. However, in the 67 years history of Indian Republic, there are unprecedented developments of law relating to factories in India.The Government of India, with the adoption of existed statute, made an effort to incorporate the welfare legislation but it never developed along with the change in time. It is to be noticed that as far as existing statutes are concerned, the development is an effect of judicial pronouncement or some tragic incident like Bhopal Gas Tragedy. This paper succinctly describes the history of factory legislation, the constitutional validity of the previous statute and necessary amendment which have already been done and / or on the verge of being amended. It will further discuss contribution of judiciary in developing the law relating to factories, scope of industrial jurisprudence in promoting the development of factory legislation. The primary focus of the research project is to reflect upon the areas where factory legislation has developed, so that proper yardstick could be made in order to put emphasis on those areas which have been remained untouched.

  13. On KEK B-Factory

    Science.gov (United States)

    Sugawara, H.

    2009-07-01

    There are two principles which the management of a research institute like KEK must respect when dealing with such big project as B-Factory. One is the scientific merit of the project and the other is the organizational consideration which includes financial, human, technical and historical elements. Ideally, the two principles are to be fully taken into account. But, in many cases, one or the other is only partially fulfilled due to unavoidable circumstances. The lack of flexibility to respond to all possible situations is more dangerous and may lead to a disaster as in the case of SSC. I will describe the process which lead to the successful construction, operation and physics presentations of KEK B-Factory following faithfully the official records.

  14. Engineering the smart factory

    Science.gov (United States)

    Harrison, Robert; Vera, Daniel; Ahmad, Bilal

    2016-10-01

    The fourth industrial revolution promises to create what has been called the smart factory. The vision is that within such modular structured smart factories, cyber-physical systems monitor physical processes, create a virtual copy of the physical world and make decentralised decisions. This paper provides a view of this initiative from an automation systems perspective. In this context it considers how future automation systems might be effectively configured and supported through their lifecycles and how integration, application modelling, visualisation and reuse of such systems might be best achieved. The paper briefly describes limitations in current engineering methods, and new emerging approaches including the cyber physical systems (CPS) engineering tools being developed by the automation systems group (ASG) at Warwick Manufacturing Group, University of Warwick, UK.

  15. On KEK B-factory

    International Nuclear Information System (INIS)

    Sugawara, Hirotaka

    2009-01-01

    There are two principles which the management of a research institute like KEK must respect when dealing with such big project as B-Factory. One is the scientific merit of the project and the other is the organizational consideration which includes financial, human, technical and historical elements. Ideally, the two principles are to be fully taken into account. But, in many cases, one or the other is only partially fulfilled due to unavoidable circumstances. The lack of flexibility to respond to all possible situations is more dangerous and may lead to a disaster as in the case of SSC. I will describe the process which lead to the successful construction, operation and physics presentations of KEK B-Factory following faithfully the official records. (author)

  16. Formulation of a candidate glass for use as an acceptance test standard material

    International Nuclear Information System (INIS)

    Ebert, W.L.; Strachan, D.M.; Wolf, S.F.

    1998-04-01

    In this report, the authors discuss the formulation of a glass that will be used in a laboratory testing program designed to measure the precision of test methods identified in the privatization contracts for the immobilization of Hanford low-activity wastes. Tests will be conducted with that glass to measure the reproducibility of tests and analyses that must be performed by glass producers as a part of the product acceptance procedure. Test results will be used to determine if the contractually required tests and analyses are adequate for evaluating the acceptability of likely immobilized low-activity waste (ILAW) products. They will also be used to evaluate if the glass designed for use in these tests can be used as an analytical standard test material for verifying results reported by vendors for tests withg ILAW products. The results of those tests and analyses will be presented in a separate report. The purpose of this report is to document the strategy used to formulate the glass to be used in the testing program. The low-activity waste reference glass LRM that will be used in the testing program was formulated to be compositionally similar to ILAW products to be made with wastes from Hanford. Since the ILAW product compositions have not been disclosed by the vendors participating in the Hanford privatization project, the composition of LRM was formulated based on simulated Hanford waste stream and amounts of added glass forming chemicals typical for vitrified waste forms. The major components are 54 mass % SiO 2 , 20 mass % Na 2 O, 10 mass % Al 2 O 3 , 8 mass % B 2 O 3 , and 1.5 mass % K 2 O. Small amounts of other chemicals not present in Hanford wastes were also included in the glass, since they may be included as chemical additives in ILAW products. This was done so that the use of LRM as a composition standard could be evaluated. Radionuclides were not included in LRM because a nonradioactive material was desired

  17. Disintegration of sublingual tablets: proposal for a validated test method and acceptance criterion.

    Science.gov (United States)

    Weda, M; van Riet-Nales, D A; van Aalst, P; de Kaste, D; Lekkerkerker, J F F

    2006-12-01

    In the Netherlands the market share of isosorbide dinitrate 5 mg sublingual tablets is dominated by 2 products (A and B). In the last few years complaints have been received from health care professionals on product B. During patient use the disintegration of the tablet was reported to be slow and/or incomplete, and ineffectiveness was experienced. In the European Pharmacopoeia (Ph. Eur.) no requirement is present for the disintegration time of sublingual tablets. The purpose of this study was to compare the in vitro disintegration time of products A and B, and to establish a suitable test method and acceptance criterion. A and B were tested with the Ph. Eur. method described in the monograph on disintegration of tablets and capsules as well as with 3 modified tests using the same Ph. Eur. apparatus, but without movement of the basket-rack assembly. In modified test 1 and modified test 2 water was used as medium (900 ml and 50 ml respectively), whereas in modified test 3 artificial saliva was used (50 ml). In addition, disintegration was tested in Nessler tubes with 0.5 and 2 ml of water. Finally, the Ph. Eur. method was also applied to other sublingual tablets with other drug substances on the Dutch market. With modified test 3 no disintegration could be achieved within 20 min. With the Ph. Eur. method and modified tests 1 and 2 product A and B differed significantly (p disintegration times. These 3 methods were capable of discriminating between products and between batches. The time measured with the Ph. Eur. method was significantly lower compared to modified tests 1 and 2 (p tablets the disintegration time should be tested. The Ph. Eur. method is considered suitable for this test. In view of the products currently on the market and taking into consideration requirements in the United States Pharmacopeia and Japanese Pharmacopoeia, an acceptance criterion of not more than 2 min is proposed.

  18. Public perceptions and acceptance of induced earthquakes related to energy development

    International Nuclear Information System (INIS)

    McComas, Katherine A.; Lu, Hang; Keranen, Katie M.; Furtney, Maria A.; Song, Hwansuck

    2016-01-01

    Growing awareness of the potential for some energy-related activities to induce earthquakes has created a need to understand how the public evaluates the risks of induced earthquakes versus the benefits of energy development. To address this need, this study presents a web survey that used a between-subjects factorial experimental design to explore the views of 325 U.S. adults, who were asked about their experiences with earthquakes; risk perceptions related to different causes of earthquakes (e.g., natural versus induced); and acceptability of earthquakes depending on the benefits, beneficiaries, and decision making process. The results found that participants had more negative feelings toward induced versus naturally occurring earthquakes. Although they judged no earthquake as “acceptable,” participants rated induced earthquakes significantly less acceptable than naturally occurring ones. Attributing the benefits to the provision of renewable energy or climate change mitigation did not increase induced earthquake acceptability, and no particular beneficiary made earthquakes more acceptable, although private companies as beneficiaries made earthquakes less acceptable. Finally, induced earthquake acceptability was significantly higher when people believed that people like them had a voice in the decision to implement the technology that caused the earthquake, underscoring the importance of public engagement in the development of energy technologies. - Highlights: • Human induced earthquakes were perceived as more negative than natural earthquakes. • Attributing benefits to renewable energy did not increase earthquake acceptability. • Acceptability was highest after a procedurally fair decision making process. • Acceptability was lowest following an expert-driven decision.

  19. Factorial Validity and Psychometric Examination of the Exercise Dependence Scale-Revised

    Science.gov (United States)

    Downs, Danielle Symons; Hausenblas, Heather A.; Nigg, Claudio R.

    2004-01-01

    The research purposes were to examine the factorial and convergent validity, internal consistency, and test-retest reliability of the Exercise Dependence Scale (EDS). Two separate studies, containing a total of 1,263 college students, were undertaken to accomplish these purposes. Participants completed the EDS and measures of exercise behavior and…

  20. Factory automation for heavy electric equipment

    International Nuclear Information System (INIS)

    Rokutani, Takashi; Ninomiya, Iwao; Hatayama, Naokatsu; Kato, Hiroshi; Yano, Hideaki.

    1986-01-01

    The heightening of productivity in the factories manufacturing heavy electric equipment has been advanced so far by the rationalization of direct workings such as NC, robots and the adoption of FMS (flexible manufacturing system). However, as CAD advances, the effective utilization of these data and the expansion to future CIM (computer integrated manufacture) have become to be demanded. In the Hitachi Works of Hitachi Ltd., it was decided to advance the synthetic rationalization by adopting FA (factory automation) system. Steam turbine blades, pipings for nuclear power plants and motor coils were taken up as the objects since these are important parts, and for the purpose of the drastic heightening of QA level, the heightening of accuracy and the shortening of processes, the synchronization with field installation schedule and the creation of safe working place environment, the FA projects for these three sections were simultaneously planned. When the automation of non-mass production factories is promoted, there are the unmanned factories combining FMS lines for relatively many products and those characterized by FMC of shortening preparation time for small lot products, and this is the examples of the former. The system constitution for FA and the production management combined with it are described. The high reliability of the optical network was regarded as important. (Kako, I.)

  1. KUSTANNUS JA KANNATTAVUUSLASKENNAN KEHITTÄMINEN CASE KOTEK FACTORY SERVICE OY

    OpenAIRE

    Ilmonen, Hanna

    2009-01-01

    Opinnäytetyön toimeksiantajana oli Kotek Factory Service Oy ja kohteena oli Kotek Factory Service Oy:n maalaamo. Kotek Factory Service on Chesterton ARC- pinnoitteiden maahantuoja ja myyjä, joka vastaa tuotteidensa erilaisista urakoinneista, täydellisinä palvelukokonaisuuksina. Opinnäytetyön tavoitteena oli saada aikaiseksi toimintaehdotus siitä, kuinka Kotek Factory Service Oy voisi kehittää kustannus ja kannattavuuslaskentaansa maalaamon ja koko yrityksen osalta. Ongelmaan haettiin ratk...

  2. Prevalence of hearing loss and accuracy of self-report among factory workers.

    Science.gov (United States)

    McCullagh, Marjorie C; Raymond, Delbert; Kerr, Madeleine J; Lusk, Sally L

    2011-01-01

    Noise represents one of the most common occupational health hazards. A Healthy People 2020 objective aims to reduce hearing loss in the noise-exposed public. The purpose of this study was to describe and compare perceived and measured hearing, and to determine the prevalence of hearing loss among a group of factory workers. Data collected as part of an intervention study promoting hearing protector use among workers at an automotive factory in the Midwest were used. Plant employees (n=2691) provided information regarding their perceived hearing ability, work role, and other demographics. The relationships among audiograms, a single-item measure of perceived hearing ability, and demographic data were explored using chi-square, McNemar's test, Mann-Whitney U-test, sensitivity, and specificity. The prevalence of hearing loss among noise-exposed factory workers was 42% (where hearing loss was defined as >25 dB loss at the OSHA-recommended frequencies of 2, 3, and 4 kHz in either ear). However, 76% of workers reported their hearing ability as excellent or good. The difference in perceived hearing ability was significant at each tested frequency between those with and without measured hearing loss. Self-reported hearing ability was poorly related to results of audiometry. Although this group of workers was employed in a regulated environment and served by a hearing conservation program, hearing loss was highly prevalent. These findings, together with national prevalence estimates, support the need for evaluation of hearing conservation programs and increased attention to the national goal of reducing adult hearing loss.

  3. Prevalence of hearing loss and accuracy of self-report among factory workers

    Directory of Open Access Journals (Sweden)

    Marjorie C McCullagh

    2011-01-01

    Full Text Available Noise represents one of the most common occupational health hazards. A Healthy People 2020 objective aims to reduce hearing loss in the noise-exposed public. The purpose of this study was to describe and compare perceived and measured hearing, and to determine the prevalence of hearing loss among a group of factory workers. Data collected as part of an intervention study promoting hearing protector use among workers at an automotive factory in the Midwest were used. Plant employees (n=2691 provided information regarding their perceived hearing ability, work role, and other demographics. The relationships among audiograms, a single-item measure of perceived hearing ability, and demographic data were explored using chi-square, McNemar′s test, Mann-Whitney U-test, sensitivity, and specificity. The prevalence of hearing loss among noise-exposed factory workers was 42% (where hearing loss was defined as >25 dB loss at the OSHA-recommended frequencies of 2, 3, and 4 kHz in either ear. However, 76% of workers reported their hearing ability as excellent or good. The difference in perceived hearing ability was significant at each tested frequency between those with and without measured hearing loss. Self-reported hearing ability was poorly related to results of audiometry. Although this group of workers was employed in a regulated environment and served by a hearing conservation program, hearing loss was highly prevalent. These findings, together with national prevalence estimates, support the need for evaluation of hearing conservation programs and increased attention to the national goal of reducing adult hearing loss.

  4. Ergonomic analysis jobs in recovered factories.

    Science.gov (United States)

    Cuenca, Gabriela; Zotta, Gastón

    2012-01-01

    With the advent of the deep economic crisis in Argentina on 2001, the recovery of companies through to the creation of the Cooperatives Working Self-Management or Factories Recovered by its workers was constituted as one of the ways in which the salaried disobeyed the increasing unemployment. When the companies turn into recovered factories they tend to leave of side practices that have been seen like imposed by the previous organization and not understanding them as a primary condition for the execution of his tasks. Safety and ergonomics are two disciplines that are no longer considered relevant to the daily work. Therefore this investigation aims to revalue, undergo semantic to give back to a place in every organization analyzed. This research developed a self-diagnostic tool for working conditions, and the environment, present in the recovered factories.

  5. Review of U.S. Neutrino Factory Studies

    International Nuclear Information System (INIS)

    Zisman, Michael S.

    2005-01-01

    We summarize the status of the two U.S. feasibility studies carried out by the Neutrino Factory and Muon Collider Collaboration (NFMCC) along with recent improvements to Neutrino Factory design developed during the American Physical Society (APS) Neutrino Physics Study. Suggested accelerator topics for the International Scoping Study (ISS) are also indicated

  6. [Distribution Characteristics of Heavy Metals in Environmental Samples Around Electroplating Factories and the Health Risk Assessment].

    Science.gov (United States)

    Guo, Peng-ran; Lei, Yong-qian; Zhou, Qiao-li; Wang, Chang; Pan, Jia-chuan

    2015-09-01

    This study aimed to investigate the pollution degree and human health risk of heavy metals in soil and air samples around electroplating factories. Soil, air and waste gas samples were collected to measure 8 heavy metals (As, Cd, Cr, Cu, Hg, Ni, Pb and Zn) in two electroplating factories, located in Baiyun district of Guangzhou city. Geoaccumulation index and USEPA Risk Assessment Guidance for Superfund (RAGS) were respectively carried out. Results showed that concentrations of Hg and Pb in waste gas and Cr in air samples were higher than limits of the corresponding quality standards, and concentrations of Cd, Hg and Zn in soil samples reached the moderate pollution level. The HQ and HI of exposure by heavy metals in air and soil samples were both lower than 1, indicating that there was no non-carcinogen risk. CRAs and CRCr in soil samples were beyond the maximum acceptable level of carcinogen risk (10(-4)), and the contribution rate of CRCr to TCR was over 81%. CRCr, CRNi and TCR in air samples were in range of 10(-6) - 10(-4), indicating there was possibly carcinogen risk but was acceptable risk. CR values for children were higher than adults in soils, but were higher for adults in air samples. Correlation analysis revealed that concentrations of heavy metals in soils were significantly correlated with these in waste gas samples, and PCA data showed pollution sources of Cd, Hg and Zn in soils were different from other metals.

  7. Mainz/PSI φ-factory design considerations

    International Nuclear Information System (INIS)

    Streun, A.

    1991-01-01

    Design considerations for a φ-factory with a Luminosity of the order of 10 33 cm -2 s -1 lead to the concept of a multi-bunch round beam double storage ring with superconducting solenoids for micro-beta focusing and beam rotation. Simulations of the beam-beam-interaction indicate, that significantly higher beam-beam-parameters may become possible with round beams. A rough draft design of a round beam φ-factory is presented. (orig.)

  8. Patients’ Acceptance of Smartphone Health Technology for Chronic Disease Management: A Theoretical Model and Empirical Test

    Science.gov (United States)

    Dou, Kaili; Yu, Ping; Liu, Fang; Guan, YingPing; Li, Zhenye; Ji, Yumeng; Du, Ningkai; Lu, Xudong; Duan, Huilong

    2017-01-01

    Background Chronic disease patients often face multiple challenges from difficult comorbidities. Smartphone health technology can be used to help them manage their conditions only if they accept and use the technology. Objective The aim of this study was to develop and test a theoretical model to predict and explain the factors influencing patients’ acceptance of smartphone health technology for chronic disease management. Methods Multiple theories and factors that may influence patients’ acceptance of smartphone health technology have been reviewed. A hybrid theoretical model was built based on the technology acceptance model, dual-factor model, health belief model, and the factors identified from interviews that might influence patients’ acceptance of smartphone health technology for chronic disease management. Data were collected from patient questionnaire surveys and computer log records about 157 hypertensive patients’ actual use of a smartphone health app. The partial least square method was used to test the theoretical model. Results The model accounted for .412 of the variance in patients’ intention to adopt the smartphone health technology. Intention to use accounted for .111 of the variance in actual use and had a significant weak relationship with the latter. Perceived ease of use was affected by patients’ smartphone usage experience, relationship with doctor, and self-efficacy. Although without a significant effect on intention to use, perceived ease of use had a significant positive influence on perceived usefulness. Relationship with doctor and perceived health threat had significant positive effects on perceived usefulness, countering the negative influence of resistance to change. Perceived usefulness, perceived health threat, and resistance to change significantly predicted patients’ intentions to use the technology. Age and gender had no significant influence on patients’ acceptance of smartphone technology. The study also

  9. Tank Monitor and Control System sensor acceptance test procedure. Revision 6

    International Nuclear Information System (INIS)

    Scaief, C.C. III.

    1994-01-01

    The purpose of this Acceptance Test Procedure (ATP) is to verify the correct reading of sensor elements connected to the Tank Monitor and Control System (TMACS). The system functional requirements are contained in WHC-SD-WM-RD-013, Rev. 1 (WHC 1992a). This ATP is intended to be used for testing of the connection of existing temperature sensors, new temperature sensors, pressure sensing equipment, new Enraf level gauges, sensors that generate a current output, and discrete (on/off) inputs. The TMACS operation was verified by the original ATP (WHC 1991 c). It is intended that this ATP will be used each time sensors are added to the system. As a result, the data sheets have been designed to be generic

  10. Acceptance/operational test procedure 241-AN-107 Video Camera System

    International Nuclear Information System (INIS)

    Pedersen, L.T.

    1994-01-01

    This procedure will document the satisfactory operation of the 241-AN-107 Video Camera System. The camera assembly, including camera mast, pan-and-tilt unit, camera, and lights, will be installed in Tank 241-AN-107 to monitor activities during the Caustic Addition Project. The camera focus, zoom, and iris remote controls will be functionally tested. The resolution and color rendition of the camera will be verified using standard reference charts. The pan-and-tilt unit will be tested for required ranges of motion, and the camera lights will be functionally tested. The master control station equipment, including the monitor, VCRs, printer, character generator, and video micrometer will be set up and performance tested in accordance with original equipment manufacturer's specifications. The accuracy of the video micrometer to measure objects in the range of 0.25 inches to 67 inches will be verified. The gas drying distribution system will be tested to ensure that a drying gas can be flowed over the camera and lens in the event that condensation forms on these components. This test will be performed by attaching the gas input connector, located in the upper junction box, to a pressurized gas supply and verifying that the check valve, located in the camera housing, opens to exhaust the compressed gas. The 241-AN-107 camera system will also be tested to assure acceptable resolution of the camera imaging components utilizing the camera system lights

  11. Recent developments on the TRIUMF KAON factory proposal

    International Nuclear Information System (INIS)

    Craddock, M.K.; Baartman, R.; Burge, R.

    1988-06-01

    The TRIUMF KAON Factory proposal has made considerable progress on both technical and political fronts over the last year. A racetrack-shaped lattice is now being considered in conjunction with a three-element slow extraction system in an effort to reduce losses to the 0.1% level. Hardware studies have continued on both magnet power supplies and on rf cavities - the latter work gaining an extra dimension from a recently-instituted formal collaboration with LAMPF. The H - extraction system for the cyclotron has been tested successfully with 66 μA pulsed and 10 μA average beams. On the political side, British Columbia has agreed to fund the buildings and tunnels (Cdn dollar 87M) and is making the KAON Factory its top priority project with the Canadian federal government. A joint federal-provincial delegation has traveled abroad and found that a number of countries would consider significant contributions to the cost. Approval of dollar 11 million in pre-construction R and D funds is expected imminently, permitting formal negotiations to start abroad, with final approval for construction coming in 1989

  12. Gaming in the Classroom: An Innovative Way to Teach Factorial Designs

    Science.gov (United States)

    Stansbury, Jessica A.; Munro, Geoffrey D.

    2013-01-01

    This study tested the effectiveness of video game use for instruction of factorial designs in a research methods course. Students designed and conducted a mini study, playing "Dance, Dance, Revolution", using video game scores as the dependent variable. A mixed-design analysis of variance revealed a significantly greater increase from pretest to…

  13. The Worlds First Ever Cooling Tower Acceptance Test Using Process Data Reconciliation

    International Nuclear Information System (INIS)

    Magnus Langenstein; Jan Hansen-Schmidt

    2006-01-01

    The cooling capacity of cooling towers is influenced by multiple constructive and atmospheric parameters in a very complex way. This leads to strong variations of the measured cold-water temperature and causes unacceptable unreliability of conventional acceptance tests, which are based on single point measurements. In order to overcome this lack of accuracy a new approach to acceptance test based on process data reconciliation has been developed by BTB Jansky and applied at a nuclear power plant. This approach uses process data reconciliation according to VDI 2048 to evaluate datasets over a long period covering different operating conditions of the cooling tower. Data reconciliation is a statistical method to determine the true process parameters with a statistical probability of 95% by considering closed material-, mass-and energy balances. Datasets which are not suitable for the evaluation due to strong transient gradients are excluded beforehand, according to well-defined criteria. The reconciled cold-water temperature is then compared, within a wet bulb temperature range of 5 deg. C to 20 deg. C to the manufacturer's guaranteed temperature. Finally, if the average deviation between reconciled and guaranteed value over the evaluated period is below zero, the cooling tower guarantee is fulfilled. (authors)

  14. A distribution-free multi-factorial profiler for harvesting information from high-density screenings.

    Science.gov (United States)

    Besseris, George J

    2013-01-01

    Data screening is an indispensable phase in initiating the scientific discovery process. Fractional factorial designs offer quick and economical options for engineering highly-dense structured datasets. Maximum information content is harvested when a selected fractional factorial scheme is driven to saturation while data gathering is suppressed to no replication. A novel multi-factorial profiler is presented that allows screening of saturated-unreplicated designs by decomposing the examined response to its constituent contributions. Partial effects are sliced off systematically from the investigated response to form individual contrasts using simple robust measures. By isolating each time the disturbance attributed solely to a single controlling factor, the Wilcoxon-Mann-Whitney rank stochastics are employed to assign significance. We demonstrate that the proposed profiler possesses its own self-checking mechanism for detecting a potential influence due to fluctuations attributed to the remaining unexplainable error. Main benefits of the method are: 1) easy to grasp, 2) well-explained test-power properties, 3) distribution-free, 4) sparsity-free, 5) calibration-free, 6) simulation-free, 7) easy to implement, and 8) expanded usability to any type and size of multi-factorial screening designs. The method is elucidated with a benchmarked profiling effort for a water filtration process.

  15. A distribution-free multi-factorial profiler for harvesting information from high-density screenings.

    Directory of Open Access Journals (Sweden)

    George J Besseris

    Full Text Available Data screening is an indispensable phase in initiating the scientific discovery process. Fractional factorial designs offer quick and economical options for engineering highly-dense structured datasets. Maximum information content is harvested when a selected fractional factorial scheme is driven to saturation while data gathering is suppressed to no replication. A novel multi-factorial profiler is presented that allows screening of saturated-unreplicated designs by decomposing the examined response to its constituent contributions. Partial effects are sliced off systematically from the investigated response to form individual contrasts using simple robust measures. By isolating each time the disturbance attributed solely to a single controlling factor, the Wilcoxon-Mann-Whitney rank stochastics are employed to assign significance. We demonstrate that the proposed profiler possesses its own self-checking mechanism for detecting a potential influence due to fluctuations attributed to the remaining unexplainable error. Main benefits of the method are: 1 easy to grasp, 2 well-explained test-power properties, 3 distribution-free, 4 sparsity-free, 5 calibration-free, 6 simulation-free, 7 easy to implement, and 8 expanded usability to any type and size of multi-factorial screening designs. The method is elucidated with a benchmarked profiling effort for a water filtration process.

  16. South African physicians’ acceptance of e-prescribing technology: an empirical test of a modified UTAUT model

    Directory of Open Access Journals (Sweden)

    Jason Cohen

    2013-07-01

    Full Text Available E-prescribing systems hold promise for improving the quality and efficiency of the scripting process. Yet, the use of the technology has been associated with a number of challenges. The diffusion of e-prescribing into physician practices and the consequent realisation of its potential benefits will depend on whether physicians are willing to accept and engage with the technology. This study draws on the Unified Theory of Acceptance and Use of Technology (UTAUT and recent literature on user trust in technology to develop and test a model of the factors influencing South African physicians’ acceptance of e-prescribing. Data was collected from a sample of 72 physicians. Results indicate a general acceptance of e-prescribing amongst physicians who on average reported strong intentions to use e-prescribing technologies if given the opportunity. PLS analysis revealed that physicians’ performance expectancies and perceptions of facilitating conditions had significant direct effects on acceptance whilst trust and effort expectancy had important indirect effects. Social influence and price value perceptions did not add additional explanatory power. The model explained 63% of the variation in physician acceptance.

  17. The Clone Factory

    Science.gov (United States)

    Stoddard, Beryl

    2005-01-01

    Have humans been cloned? Is it possible? Immediate interest is sparked when students are asked these questions. In response to their curiosity, the clone factory activity was developed to help them understand the process of cloning. In this activity, students reenact the cloning process, in a very simplified simulation. After completing the…

  18. The Modified Reasons for Smoking Scale: factorial structure, validity and reliability in pregnant smokers.

    Science.gov (United States)

    De Wilde, Katrien Sophie; Tency, Inge; Boudrez, Hedwig; Temmerman, Marleen; Maes, Lea; Clays, Els

    2016-06-01

    Smoking during pregnancy can cause several maternal and neonatal health risks, yet a considerable number of pregnant women continue to smoke. The objectives of this study were to test the factorial structure, validity and reliability of the Dutch version of the Modified Reasons for Smoking Scale (MRSS) in a sample of smoking pregnant women and to understand reasons for continued smoking during pregnancy. A longitudinal design was performed. Data of 97 pregnant smokers were collected during prenatal consultation. Structural equation modelling was performed to assess the construct validity of the MRSS: an exploratory factor analysis was conducted, followed by a confirmatory factor analysis.Test-retest reliability (addiction, pleasure, habit and social function. Results for internal consistency and test-retest reliability were good to acceptable. There were significant associations of nicotine dependence with tension reduction and addiction and of daily consumption with addiction and habit. Validity and reliability of the MRSS were shown in a sample of pregnant smokers. Tension reduction was the most important reason for continued smoking, followed by pleasure and addiction. Although the score for nicotine dependence was low, addiction was an important reason for continued smoking during pregnancy; therefore, nicotine replacement therapy could be considered. Half of the respondents experienced depressive symptoms. Hence, it is important to identify those women who need more specialized care, which can include not only smoking cessation counselling but also treatment for depression. © 2016 John Wiley & Sons, Ltd.

  19. Criteria required for an acceptable point-of-care test for UTI detection: Obtaining consensus using the Delphi technique.

    Science.gov (United States)

    Weir, Nichola-Jane M; Pattison, Sally H; Kearney, Paddy; Stafford, Bob; Gormley, Gerard J; Crockard, Martin A; Gilpin, Deirdre F; Tunney, Michael M; Hughes, Carmel M

    2018-01-01

    Urinary Tract Infections (UTIs) are common bacterial infections, second only to respiratory tract infections and particularly prevalent within primary care. Conventional detection of UTIs is culture, however, return of results can take between 24 and 72 hours. The introduction of a point of care (POC) test would allow for more timely identification of UTIs, facilitating improved, targeted treatment. This study aimed to obtain consensus on the criteria required for a POC UTI test, to meet patient need within primary care. Criteria for consideration were compiled by the research team. These criteria were validated through a two-round Delphi process, utilising an expert panel of healthcare professionals from across Europe and United States of America. Using web-based questionnaires, panellists recorded their level of agreement with each criterion based on a 5-point Likert Scale, with space for comments. Using median response, interquartile range and comments provided, criteria were accepted/rejected/revised depending on pre-agreed cut-off scores. The first round questionnaire presented thirty-three criteria to the panel, of which 22 were accepted. Consensus was not achieved for the remaining 11 criteria. Following response review, one criterion was removed, while after revision, the remaining 10 criteria entered the second round. Of these, four were subsequently accepted, resulting in 26 criteria considered appropriate for a POC test to detect urinary infections. This study generated an approved set of criteria for a POC test to detect urinary infections. Criteria acceptance and comments provided by the healthcare professionals also supports the development of a multiplex point of care UTI test.

  20. Photon Factory activity report, 1990

    International Nuclear Information System (INIS)

    1991-01-01

    The Photon Factory has grown at a considerable rate, and 600 experiments are carried out in 1991, while the number of users is now 2300 including about 500 from industrial sectors. The use of synchrotron radiation increased from fundamental research to industrial development. The development at the Photon Factory is supported by the capability of the accelerators. At present, the 2.5 GeV PF ring is operated with positrons at the initial beam current of 350 mA. The total operation time was 3500 hours in the fiscal year 1990. The development of an avalanche mode photodiode, the observation of quantum beat in the experiment of nuclear Bragg scattering, the measurement of photo-electron and photo-ion spectroscopy were carried out. The conversion of TRISTAN main ring to an ultrahigh brilliance and high coherence source is planned for the future. The annual PF Symposium was held, and Professor H. Winick gave the lecture 'Ultrahigh brightness and coherent radiation from large storage rings'. In this report, the outline of the Photon Factory and the activities in Divisions of Injector Linac, Light Source and Instrumentation are described. (K.I.)

  1. Tank Monitor and Control System sensor acceptance test procedure. Revision 5

    International Nuclear Information System (INIS)

    Scaief, C.C. III.

    1994-01-01

    The purpose of this acceptance test procedure (ATP) is to verify the correct reading of sensor elements connected to the Tank Monitor and Control System (TMACS). This ATP is intended to be used for testing of the connection of existing temperature sensors, new temperature sensors, pressure sensing equipment, new Engraf level gauges, sensors that generate a current output, and discrete (on/off) inputs. It is intended that this ATP will be used each time sensors are added to the system. As a result, the data sheets have been designed to be generic. The TMACS has been designed in response to recommendations from the Defense Nuclear Facilities Safety Board primarily for improved monitoring of waste tank temperatures. The system has been designed with the capability to monitor other types of sensor input as well

  2. The Virtual Factory Teaching System (VFTS): Project Review and Results.

    Science.gov (United States)

    Kazlauskas, E. J.; Boyd, E. F., III; Dessouky, M. M.

    This paper presents a review of the Virtual Factory Teaching (VFTS) project, a Web-based, multimedia collaborative learning network. The system allows students, working alone or in teams, to build factories, forecast demand for products, plan production, establish release rules for new work into the factory, and set scheduling rules for…

  3. Bridging the Gap between Social Acceptance and Ethical Acceptability.

    Science.gov (United States)

    Taebi, Behnam

    2017-10-01

    New technology brings great benefits, but it can also create new and significant risks. When evaluating those risks in policymaking, there is a tendency to focus on social acceptance. By solely focusing on social acceptance, we could, however, overlook important ethical aspects of technological risk, particularly when we evaluate technologies with transnational and intergenerational risks. I argue that good governance of risky technology requires analyzing both social acceptance and ethical acceptability. Conceptually, these two notions are mostly complementary. Social acceptance studies are not capable of sufficiently capturing all the morally relevant features of risky technologies; ethical analyses do not typically include stakeholders' opinions, and they therefore lack the relevant empirical input for a thorough ethical evaluation. Only when carried out in conjunction are these two types of analysis relevant to national and international governance of risky technology. I discuss the Rawlsian wide reflective equilibrium as a method for marrying social acceptance and ethical acceptability. Although the rationale of my argument is broadly applicable, I will examine the case of multinational nuclear waste repositories in particular. This example will show how ethical issues may be overlooked if we focus only on social acceptance, and will provide a test case for demonstrating how the wide reflective equilibrium can help to bridge the proverbial acceptance-acceptability gap. © 2016 The Authors Risk Analysis published by Wiley Periodicals, Inc. on behalf of Society for Risk Analysis.

  4. Four-legged factories

    International Nuclear Information System (INIS)

    Mackie, R.I.; Van der Walt, J.G.

    1982-01-01

    Insight into how ruminants utilise plant material, converting what is essentially waste into food, wool and draught power for Man is being sought by Animal Scientists using isotopic tracer techniques. Answers to cost-effectice biological conversion lie in the complex interactions of the rumen's microbial fermentation factory and the host animal's diet and metabolism

  5. Measurement of Air Pollution Comes from Adra Cement Factory

    International Nuclear Information System (INIS)

    Odat, M.; Meslmani, Y.; Al-Kharfan, K.; Shamali, K.

    2013-06-01

    Measurements of air pollution were carried out in and around Adra cement factory during a single period (December). The Measurements included the following: 1- Dust fall. 2- Total suspended particulates (TSP) and inhalable particulates PM-1-0 & PM-3 inside the factor and in residential area surrounded the factory (Worker City of Adra, Adra city, Wafeden Mokheam, Baironi Hospital and Alkatiefa City). 3-Determination the levels of Cd, Pb, Cu and zinc associated with air born. 4- Determination of toxic gases (CO, SO-2 and NO-x) emitted from the chimneys. The results showed that the quantity of dust fall was varied obviously inside the factory and the regions affected by air pollutions. The monthly concentration of dust fall were 165, 27 and 10 tons/Km 2 /month inside the factory , affected villages and Baironi Hospital respectively, Wherein the permissible limit is (9tons/Km'2/month). The total suspended particulates (TSP) and inhalable particulates PM-1-0 & PM-3 in the studies area were higher than the permissible limit. The TSP concentrations inside the factory ranged between 497 and 2021 microgram/m'3 while the ranged between 328 and 561 microgram /m'3 in the surrounded villages and between 232 and 244 microgram/m'3 near Damascus, the were far higher than the world health organization (WHO) standards (120 Microgram/m'3). The PM-3 which is the most effecting on the human health reached 117.6, 124.6 and 62.6 microgram /m 3 inside the factory (main in trance), city worker of Adra and Baironi Hospital respectively, theses concentrations were higher than the Syrian standards (15 microgram/m'3) The measurements which were carried out through an exclusive day refered that the percentage of TSP/PM-3 is increasedwith moving away from the factory and reached 6.8, 18.6, 19.3% in the main intrance of the factory, worker city of Adra and Bironi Hospital respectively. The level of toxic gases inside the source (chimneys) was within the standards

  6. Advanced manufacturing: optimising the factories of tomorrow

    International Nuclear Information System (INIS)

    Philippon, Patrick

    2013-01-01

    Faced with competition Patrick Philippon - Les Defis du CEA no.179 - April 2013 from the emerging countries, the competitiveness of the industrialised nations depends on the ability of their industries to innovate. This strategy necessarily entails the reorganisation and optimisation of the production systems. This is the whole challenge for 'advanced manufacturing', which relies on the new information and communication technologies. Interactive robotics, virtual reality and non-destructive testing are all technological building blocks developed by CEA, now approved within a cross-cutting programme, to meet the needs of industry and together build the factories of tomorrow. (author)

  7. Patients' Acceptance of Smartphone Health Technology for Chronic Disease Management: A Theoretical Model and Empirical Test.

    Science.gov (United States)

    Dou, Kaili; Yu, Ping; Deng, Ning; Liu, Fang; Guan, YingPing; Li, Zhenye; Ji, Yumeng; Du, Ningkai; Lu, Xudong; Duan, Huilong

    2017-12-06

    Chronic disease patients often face multiple challenges from difficult comorbidities. Smartphone health technology can be used to help them manage their conditions only if they accept and use the technology. The aim of this study was to develop and test a theoretical model to predict and explain the factors influencing patients' acceptance of smartphone health technology for chronic disease management. Multiple theories and factors that may influence patients' acceptance of smartphone health technology have been reviewed. A hybrid theoretical model was built based on the technology acceptance model, dual-factor model, health belief model, and the factors identified from interviews that might influence patients' acceptance of smartphone health technology for chronic disease management. Data were collected from patient questionnaire surveys and computer log records about 157 hypertensive patients' actual use of a smartphone health app. The partial least square method was used to test the theoretical model. The model accounted for .412 of the variance in patients' intention to adopt the smartphone health technology. Intention to use accounted for .111 of the variance in actual use and had a significant weak relationship with the latter. Perceived ease of use was affected by patients' smartphone usage experience, relationship with doctor, and self-efficacy. Although without a significant effect on intention to use, perceived ease of use had a significant positive influence on perceived usefulness. Relationship with doctor and perceived health threat had significant positive effects on perceived usefulness, countering the negative influence of resistance to change. Perceived usefulness, perceived health threat, and resistance to change significantly predicted patients' intentions to use the technology. Age and gender had no significant influence on patients' acceptance of smartphone technology. The study also confirmed the positive relationship between intention to use

  8. [Statistical approach to evaluate the occurrence of out-of acceptable ranges and accuracy for antimicrobial susceptibility tests in inter-laboratory quality control program].

    Science.gov (United States)

    Ueno, Tamio; Matuda, Junichi; Yamane, Nobuhisa

    2013-03-01

    To evaluate the occurrence of out-of acceptable ranges and accuracy of antimicrobial susceptibility tests, we applied a new statistical tool to the Inter-Laboratory Quality Control Program established by the Kyushu Quality Control Research Group. First, we defined acceptable ranges of minimum inhibitory concentration (MIC) for broth microdilution tests and inhibitory zone diameter for disk diffusion tests on the basis of Clinical and Laboratory Standards Institute (CLSI) M100-S21. In the analysis, more than two out-of acceptable range results in the 20 tests were considered as not allowable according to the CLSI document. Of the 90 participating laboratories, 46 (51%) experienced one or more occurrences of out-of acceptable range results. Then, a binomial test was applied to each participating laboratory. The results indicated that the occurrences of out-of acceptable range results in the 11 laboratories were significantly higher when compared to the CLSI recommendation (allowable rate laboratory was statistically compared with zero using a Student's t-test. The results revealed that 5 of the 11 above laboratories reported erroneous test results that systematically drifted to the side of resistance. In conclusion, our statistical approach has enabled us to detect significantly higher occurrences and source of interpretive errors in antimicrobial susceptibility tests; therefore, this approach can provide us with additional information that can improve the accuracy of the test results in clinical microbiology laboratories.

  9. ISOLOK VALVE ACCEPTANCE TESTING FOR DWPF SME SAMPLING PROCESS

    Energy Technology Data Exchange (ETDEWEB)

    Edwards, T.; Hera, K.; Coleman, C.; Jones, M.; Wiedenman, B.

    2011-12-05

    Evaluation of the Defense Waste Processing Facility (DWPF) Chemical Process Cell (CPC) cycle time identified several opportunities to improve the CPC processing time. Of the opportunities, a focus area related to optimizing the equipment and efficiency of the sample turnaround time for DWPF Analytical Laboratory was identified. The Mechanical Systems & Custom Equipment Development (MS&CED) Section of the Savannah River National Laboratory (SRNL) evaluated the possibility of using an Isolok{reg_sign} sampling valve as an alternative to the Hydragard{reg_sign} valve for taking process samples. Previous viability testing was conducted with favorable results using the Isolok sampler and reported in SRNL-STI-2010-00749 (1). This task has the potential to improve operability, reduce maintenance time and decrease CPC cycle time. This report summarizes the results from acceptance testing which was requested in Task Technical Request (TTR) HLW-DWPF-TTR-2010-0036 (2) and which was conducted as outlined in Task Technical and Quality Assurance Plan (TTQAP) SRNL-RP-2011-00145 (3). The Isolok to be tested is the same model which was tested, qualified, and installed in the Sludge Receipt Adjustment Tank (SRAT) sample system. RW-0333P QA requirements apply to this task. This task was to qualify the Isolok sampler for use in the DWPF Slurry Mix Evaporator (SME) sampling process. The Hydragard, which is the current baseline sampling method, was used for comparison to the Isolok sampling data. The Isolok sampler is an air powered grab sampler used to 'pull' a sample volume from a process line. The operation of the sampler is shown in Figure 1. The image on the left shows the Isolok's spool extended into the process line and the image on the right shows the sampler retracted and then dispensing the liquid into the sampling container. To determine tank homogeneity, a Coliwasa sampler was used to grab samples at a high and low location within the mixing tank. Data from

  10. Assessment of Tooth Wear Among Glass Factory Workers: WHO 2013 Oral Health Survey.

    Science.gov (United States)

    Chaturvedi, Pulkit; Bhat, Nagesh; Asawa, Kailash; Tak, Mridula; Bapat, Salil; Gupta, Vivek Vardhan

    2015-08-01

    Glass factory workers are often exposed to the hazardous environment that leads to deleterious oral health and subsequently, general health. We planned to determine the effects of the particulates present in the milieu on the tooth wear among workers. To assess tooth wear among glass factory workers in Jaipur, Rajasthan, India. A descriptive cross-sectional survey was conducted among 936 glass workers in Jaipur, Rajasthan, India from January-June 2014. A survey proforma was designed for tooth wear evaluation with the help of WHO Oral Health Assessment form 2013 (for adults). Information regarding oral health practices, adverse habits and dietary habits, demographic details was gathered and clinical parameters were recorded. The Chi-square test, t-test, One-way Analysis of Variance and a Stepwise multiple linear regression analysis. The most prevalent form of erosion was enamel erosion (589, 62.93%) with few subjects of deeper dentinal erosion and the difference was statistically significant (p=0.001). Dental erosion was found to be higher among males compared to females. Years of experience and educational status were identified as best predictors for dental erosion. It was concluded that there was considerable evidence of dental erosion found among the factory workers. Due to ignorance on social, cultural and health aspects, professional approach with regular dental care services for detection of early symptoms and planning of preventive strategies is warranted.

  11. Operating a production pilot factory serving several scientific domains

    Science.gov (United States)

    Sfiligoi, I.; Würthwein, F.; Andrews, W.; Dost, J. M.; MacNeill, I.; McCrea, A.; Sheripon, E.; Murphy, C. W.

    2011-12-01

    Pilot infrastructures are becoming prominent players in the Grid environment. One of the major advantages is represented by the reduced effort required by the user communities (also known as Virtual Organizations or VOs) due to the outsourcing of the Grid interfacing services, i.e. the pilot factory, to Grid experts. One such pilot factory, based on the glideinWMS pilot infrastructure, is being operated by the Open Science Grid at University of California San Diego (UCSD). This pilot factory is serving multiple VOs from several scientific domains. Currently the three major clients are the analysis operations of the HEP experiment CMS, the community VO HCC, which serves mostly math, biology and computer science users, and the structural biology VO NEBioGrid. The UCSD glidein factory allows the served VOs to use Grid resources distributed over 150 sites in North and South America, in Europe, and in Asia. This paper presents the steps taken to create a production quality pilot factory, together with the challenges encountered along the road.

  12. Operating a production pilot factory serving several scientific domains

    International Nuclear Information System (INIS)

    Sfiligoi, I; Würthwein, F; Andrews, W; Dost, J M; MacNeill, I; McCrea, A; Sheripon, E; Murphy, C W

    2011-01-01

    Pilot infrastructures are becoming prominent players in the Grid environment. One of the major advantages is represented by the reduced effort required by the user communities (also known as Virtual Organizations or VOs) due to the outsourcing of the Grid interfacing services, i.e. the pilot factory, to Grid experts. One such pilot factory, based on the glideinWMS pilot infrastructure, is being operated by the Open Science Grid at University of California San Diego (UCSD). This pilot factory is serving multiple VOs from several scientific domains. Currently the three major clients are the analysis operations of the HEP experiment CMS, the community VO HCC, which serves mostly math, biology and computer science users, and the structural biology VO NEBioGrid. The UCSD glidein factory allows the served VOs to use Grid resources distributed over 150 sites in North and South America, in Europe, and in Asia. This paper presents the steps taken to create a production quality pilot factory, together with the challenges encountered along the road.

  13. Sterile neutrinos beyond LSND at the neutrino factory

    International Nuclear Information System (INIS)

    Meloni, Davide; Tang Jian; Winter, Walter

    2010-01-01

    We discuss the effects of one additional sterile neutrino at the Neutrino Factory. Compared to earlier analyses, which have been motivated by Liquid Scintillator Neutrino Detector (LSND) results, we do not impose any constraint on the additional mass squared splitting. This means that the additional mass eigenstate could, with small mixings, be located among the known ones, as it is suggested by the recent analysis of cosmological data. We use a self-consistent framework at the Neutrino Factory without any constraints on the new parameters. We demonstrate for a combined short and long baseline setup that near detectors can provide the expected sensitivity at the LSND-motivated Δm 41 2 -range, while some sensitivity can also be obtained in the region of the atmospheric mass splitting from the long baselines. We point out that limits on such very light sterile neutrinos may also be obtained from a reanalysis of atmospheric and solar neutrino oscillation data, as well as from supernova neutrino observations. In the second part of the analysis, we compare our sensitivity with the existing literature using additional assumptions, such as |Δm 41 2 |>>|Δm 31 2 |, leading to averaging of the fast oscillations in the far detectors. We demonstrate that while the Neutrino Factory has excellent sensitivity compared to existing studies using similar assumptions, one has to be very careful interpreting these results for a combined short and long baseline setup where oscillations could occur in the near detectors. We also test the impact of additional ν τ detectors at the short and long baselines, and we do not find a substantial improvement of the sensitivities.

  14. Proposed limiting values for performance criteria in acceptance testing of diagnostic X-ray equipment in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Baeuml, A.

    1989-01-01

    In the Federal Republic of Germany a new X-ray ordinance came into force in 1988 containing a specific paragraph on quality assurance for all medical X-ray units stipulating acceptance tests, regular checks and supervision by medical bodies and the competent authorities. Acceptance testing is to be performed by engineers from equipment suppliers of manufacturers in new and existing installations. It is expected that the service engineers will adjust the equipment in such a way as to obtain optimal performance before measurements are made, the results of which are to be stated in a certificate describing quality status of the equipment. A working group has developed guidelines for these acceptance tests. Items to be measured are reported and proposed limiting values and their tolerances are discussed. (author)

  15. Proposed limiting values for performance criteria in acceptance testing of diagnostic X-ray equipment in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Baeuml, A.

    1989-01-01

    In the Federal Republic of Germany a new X-ray ordinance came into force in 1988 containing a specific paragraph on quality assurance for all medical X-ray units stipulating acceptance tests, regular checks and supervision by medical bodies and the competent authorities. Acceptance testing is to be performed by engineers from the equipment suppliers or manufacturers in new and also existing installations. It is expected that the service engineers will adjust the equipment in such a way as to obtain optimal performance before measurements are made, the results of which are to be stated in a certificate describing the quality status of the equipment. A working group has developed guidelines for these acceptance tests. The items to be measured are reported and the proposed limiting values and their tolerances are discussed. (author)

  16. Gender bias in nineteenth-century England: Evidence from factory children.

    Science.gov (United States)

    Horrell, Sara; Oxley, Deborah

    2016-09-01

    Gender bias against girls in nineteenth-century England has received much interest but establishing its existence has proved difficult. We utilise data on heights of 16,402 children working in northern textile factories in 1837 to examine whether gender bias was evident. Current interpretations argue against any difference. Here our comparisons with modern height standards reveal greater deprivation for girls than for boys. Discrimination is measured in girls' height-for-age score (HAZ) falling eight standard errors below boys' at ages 11, 11.5 and 12 years of age, capturing the very poor performance of factory girls. But this result cannot be taken at face value. We query whether modern standards require adjustment to account for the later timing of puberty in historical populations and develop an alternative. We also test the validity of the age data, considering whether parents were more prone to lie about the ages of their daughters, and question whether the supply of girls was fundamentally different from that of boys. We conclude that neither proposition is justified. Disadvantage to girls remains, although its absence amongst younger children precludes an indictment of culturally founded gender bias. The height data must remain mute on the source of this discrimination but we utilise additional information to examine some hypotheses: occupational sorting, differential susceptibility to disease, poorer nutrition for girls, disproportionate stunting from the effects of nutritional deprivation, and type and amount of work undertaken. Of these we suggest that girls had to do arduous physical labour in the home alongside their factory work. The only (unsubstantiated) alternative is that girls were more likely than boys to be put into factory work below the legal age limit. Both represent forms of gender bias. Copyright © 2016 Elsevier B.V. All rights reserved.

  17. Physics at e+e- factories

    International Nuclear Information System (INIS)

    Lueth, V.; MacFarlane, D.B.

    1991-02-01

    Feasible designs are well advanced for high-luminosity e + e - storage rings which produce B 0 bar B 0 pairs either at rest or, in what appears to be a more promising option, boosted in the detector frame. Facilities which could provide samples of 30--100 fb -1 per year on the Υ(4S) will be proposed in early 1991. Here we examine the principal physics goal of such B Factories, namely CP violation in the b system. Methods in a variety of channels, estimated event samples, and detector requirements are all considered. We conclude that the physics argument for an e + e - B Factory is well documented, and compelling. 50 refs., 22 figs., 10 tabs

  18. Design, analysis and presentation of factorial randomised controlled trials

    Directory of Open Access Journals (Sweden)

    Little Paul

    2003-11-01

    Full Text Available Abstract Background The evaluation of more than one intervention in the same randomised controlled trial can be achieved using a parallel group design. However this requires increased sample size and can be inefficient, especially if there is also interest in considering combinations of the interventions. An alternative may be a factorial trial, where for two interventions participants are allocated to receive neither intervention, one or the other, or both. Factorial trials require special considerations, however, particularly at the design and analysis stages. Discussion Using a 2 × 2 factorial trial as an example, we present a number of issues that should be considered when planning a factorial trial. The main design issue is that of sample size. Factorial trials are most often powered to detect the main effects of interventions, since adequate power to detect plausible interactions requires greatly increased sample sizes. The main analytical issues relate to the investigation of main effects and the interaction between the interventions in appropriate regression models. Presentation of results should reflect the analytical strategy with an emphasis on the principal research questions. We also give an example of how baseline and follow-up data should be presented. Lastly, we discuss the implications of the design, analytical and presentational issues covered. Summary Difficulties in interpreting the results of factorial trials if an influential interaction is observed is the cost of the potential for efficient, simultaneous consideration of two or more interventions. Factorial trials can in principle be designed to have adequate power to detect realistic interactions, and in any case they are the only design that allows such effects to be investigated.

  19. Hadronic atoms at a kaon factory

    International Nuclear Information System (INIS)

    Leon, M.

    1982-01-01

    Beyond doubt, the advent of a kaon factory will be of immense significance for the study of hadronic atoms. Here we will discuss some classes of experiments that certainly can and will be done at a kaon factory, as well as some very interesting possibilities which deserve investigation. Among the certains we include the observation of hadronic x rays from kaonic and μ - atoms, for both Z greater than one and for the isotopes of hydrogen, mainly for strong interaction information. More conjectural is the possibility of measuring Xi - and Ω - x rays

  20. Parasitic crossing at an asymmetric B factory, APIARY

    International Nuclear Information System (INIS)

    Chin, Y.H.

    1991-05-01

    Effects of parasitic crossings (''near miss'' collisions of two counter-rotating beams at unwanted positions near the IP) are studied in terms of computer simulations for an asymmetric B Factory, APIARY- 6.3d. Beams are separated horizontally at the first parasitic crossing points by about 7.6 times the horizontal rms size of the low energy beam (the larger in size of the two beams), σ 0x,+ . Simulations, including both the beam collision at the IP and parasitic crossings, have been performed for different separation distances, d. It is found that the ratio d/σ 0x,+ is a good scaling parameter of beam blowup behavior. The results show that beam blowup due to the parasitic crossings is diminished for d ≥ 7σ 0x,+ , in agreement with the bunch separation experiment at CESR. Thus, the nominal separation 7.6 σ 0x,+ turns out to be acceptable, but with only a small margin. Some methods to mitigate the effects of the parasitic crossings are discussed. 3 refs. , 5 figs., 2 tabs

  1. Pengaruh Gaya Kepemimpinan Terhadap Motivasi Kerja (Studi Pada Karyawan PT. Indolakto Factory Pandaan)

    OpenAIRE

    Adiani, Atika Laili; Susilo, Heru; Prasetya, Arik

    2016-01-01

    This research was aimed to understand the general description and effect of leadership styles, concerning with telling, selling, participating and delegating, either simultaneously or partially, on work motivation of the employees at PT. Indolakto Factory Pandaan. Indeed, quantitative analysis was employed to describe the variables using statistic test. Explanatory approach was considered to explain the causal relationship across variable through hypothesis testing. Population of research inc...

  2. Russian factory inspection (1882-1918): cui bono?

    OpenAIRE

    Volodin , Andrei Y.

    2008-01-01

    This study deals with history of important state institution in late Russian Empire - factory inspection. Such aspects of institutional development as evolution of legislative regulations, growth of staff, and complication of functions (and particularly, mediation in labour conflicts) are scrutinized. This paper presents some results on Russian experience of labour law implementation seeking to determine and evaluate the role and efficiency of Russian factory inspectors in conflicting triangl...

  3. Planned e+e- factories

    International Nuclear Information System (INIS)

    Le Duff, J.

    1993-09-01

    Various Beauty and Tau-Charm factories and projects are reviewed. Different machines (TRISTAN II, PEP II, CESR-B, the Dubna project and the European project) are compared and their design and parameters are described. (K.A.) 34 refs., 2 figs., 2 tabs

  4. Factorial Structure of Rosenberg's Self-Esteem Scale among Crack-Cocaine Drug Users.

    Science.gov (United States)

    Wang, Jichuan; Siegal, Harvey A.; Falck, Russell S.; Carlson, Robert G.

    2001-01-01

    Used nine different confirmatory factor analysis models to test the factorial structure of Rosenberg's (M. Rosenberg, 1965) self-esteem scale with a sample of 430 crack-cocaine users. Results partly support earlier research to show a single global self-esteem factor underlying responses to the Rosenberg scale, method effects associated with item…

  5. The Physics of the B Factories

    International Nuclear Information System (INIS)

    Bevan, A.J.; Golob, B.; Mannel, T.

    2014-01-01

    The inspiration for this book came from Fran@cois le Diberder. During his term as spokesperson for BABAR he laid down a vision for the two B Factory detector collaborations, BABAR and Belle, to work together on a book that would describe the methodologies used and physics results obtained by those experiments. A key ideal emphasized from the outset was that this book should be written from a pedagogical perspective; it should be of interest to the student and expert alike. This vision was presented during a BABAR collaboration meeting on the island of Elba in May 2008 and a follow up Belle collaboration meeting at KEK, with visiting colleagues from the BABAR collaboration, and was embraced by the community. A number of workshops involving people from the theoretical community as well as the two collaborations were held on four continents over the following years. The resulting book, ''The Physics of the B Factories'', is a testament to the way that this concept captured the zeitgeist on both sides of the Pacific Ocean. This book is divided into three parts, the first of which provides a brief description of the B Factories, including a short (though not exhaustive) historical perspective, as well as descriptions of the detectors, ancillary data acquisition systems and data (re)processing systems that were built by the two detector collaborations in the late 1990's. The second part of the book discusses tools and methods that are frequently used when analyzing the data collected. These range from details of low level reconstruction algorithms and abstract summaries of statistical methods to high level prescriptions used when evaluating systematic uncertainties on measurements of observables. The third part of the book is devoted to physics results. This includes sufficient theoretical discussion in order for the reader to understand the context of the work being described. We are indebted to our colleagues from the theoretical community who have helped us achieve

  6. The nearby supernova factory

    International Nuclear Information System (INIS)

    Wood-Vasey, W.M.; Aldering, G.; Lee, B.C.; Loken, S.; Nugent, P.; Perlmutter, S.; Siegrist, J.; Wang, L.; Antilogus, P.; Astier, P.; Hardin, D.; Pain, R.; Copin, Y.; Smadja, G.; Gangler, E.; Castera, A.; Adam, G.; Bacon, R.; Lemonnier, J.-P.; Pecontal, A.; Pecontal, E.; Kessler, R.

    2004-01-01

    The Nearby Supernova Factory (SNfactory) is an ambitious project to find and study in detail approximately 300 nearby Type Ia supernovae (SNe Ia) at redshifts 0.03 < z < 0.08. This program will provide an exceptional data set of well-studied SNe in the nearby smooth Hubble flow that can be used as calibration for the current and future programs designed to use SNe to measure the cosmological parameters. The first key ingredient for this program is a reliable supply of Hubble-flow SNe systematically discovered in unprecedented numbers using the same techniques as those used in distant SNe searches. In 2002, 35 SNe were found using our test-bed pipeline for automated SN search and discovery. The pipeline uses images from the asteroid search conducted by the Near Earth Asteroid Tracking group at JPL. Improvements in our subtraction techniques and analysis have allowed us to increase our effective SN discovery rate to ∼12 SNe/month in 2003

  7. The physics program of a high-luminosity asymmetric B Factory at SLAC

    International Nuclear Information System (INIS)

    1989-10-01

    A high-luminosity asymmetric energy B Factory, proposed as an upgrade to the PEP storage ring at SLAC, provides the best opportunity to study CP violation as a means of testing the consistency of the Standard Model. If the phenomenon of CP violation is explained by the Standard Model simply through the non-zero angles and phase of the Kobayashi-Maskawa matrix, then there are precise relations between the K-M parameters and the various measurable CP-violating asymmetries in B meson decay. Should these consistency relations fail, the origin of CP violation must lie outside the Standard Model framework. Our measurements would then lead to the first experiment-driven extensions of the Standard Model. The B Factory will also carry out a varied, high-quality program of studies of other aspects of the physics of b quarks, as well as high-precision measurements in τ and charm physics. We describe a detailed series of measurements to be carried out in the first few years at a peak luminosity of 3 x 10 33 cm -2 sec -1 , the initial luminosity goal of the B Factory, as well as the program accessible to a larger data sample

  8. ENRAF Series 854 Advanced Technology Gauge (ATG) with SPU II card for Leak Detector Use Acceptance Test Procedure

    International Nuclear Information System (INIS)

    SMITH, S.G.

    1999-01-01

    The following Acceptance Test Procedure was written to test the ENRAF series 854 ATG with SPU II card prior to installation in the Tank Farms. The procedure sets various parameters and verifies the gauge and alarms functionality

  9. Individual-level characteristics associated with oral HIV test acceptability among Peruvian men who have sex with men and transgender women: a cross-sectional study.

    Science.gov (United States)

    Flores, Juan A; Brown, Brandon; León, Segundo R; Sánchez, Hugo; Galea, Jerome T

    2018-03-24

    Peruvian men who have sex with men (MSM) and transgender women (TGW) are highly vulnerable to HIV infection (HIV), but stigma, access issues and fear of venipuncture hamper testing. The oral HIV test-which uses oral fluids and provides results in 20 minutes-could reduce these barriers. The objective of this study was to determine the acceptability of the oral HIV test and the individual-level factors associated with its acceptability among MSM and TGW. We conducted a cross-sectional secondary analysis among Peruvian MSM and TGW attending a community-based health centre between February 2012 and February 2013 to determine the individual-level factors associated with oral HIV test acceptability. Of 334 participants, 88% were MSM and 12% TGW. Overall, 85% of participants indicated their acceptability of the oral HIV test. Acceptability was higher in MSM than TGW (85.7% vs 80.0%) but this difference was not significant. Factors associated with acceptability in MSM were: tertiary or higher education (prevalence ratio (PR)=1.18, 95% CI 1.06 to 1.32 and PR=1.16, 95% CI 1.03 to 1.30, respectively); sex with drug use (PR=1.19, 95% CI 1.05 to 1.36); believing that HIV is transmitted by saliva (PR=1.20, 95% CI 1.08 to 1.33); and potential use of the oral test at home (PR=1.56, 95% CI 1.32 to 1.85). The only factor associated with lower acceptability was having had first anal intercourse between 14 and 19 years of age (PR=0.89, 95% CI 0.80 to 0.98). We identified the individual factors associated with oral HIV test acceptability among Peruvian MSM and TGW. Expanded use of the oral HIV test to increase testing rates among Peruvian MSM and TGW is recommended. NCT01387412, post-results. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  10. Pseudomonas putida as a microbial cell factory

    DEFF Research Database (Denmark)

    Wigneswaran, Vinoth

    for sustainable production of chemicals, which can be achieved by microbial cell factories. The work presented in this PhD thesis elucidates the application of Pseudomonas putida as a microbial cell factory for production of the biosurfactant rhamnolipid. The rhamnolipid production was achieved by heterologous...... phase. The genomic alterations were identified by genome sequencing and revealed parallel evolution. Glycerol was also shown to be able to support biofilm growth and as a result of this it can be used as an alternative substrate for producing biochemicals in conventional and biofilm reactors. The use...... of biofilm as a production platform and the usage of glycerol as a feedstock show the potential of using microbial cell factories in the transition toward sustainable production of chemicals. Particularly, the applicability of biofilm as a production platform can emerge as a promising alternative...

  11. Engineering Robustness of Microbial Cell Factories.

    Science.gov (United States)

    Gong, Zhiwei; Nielsen, Jens; Zhou, Yongjin J

    2017-10-01

    Metabolic engineering and synthetic biology offer great prospects in developing microbial cell factories capable of converting renewable feedstocks into fuels, chemicals, food ingredients, and pharmaceuticals. However, prohibitively low production rate and mass concentration remain the major hurdles in industrial processes even though the biosynthetic pathways are comprehensively optimized. These limitations are caused by a variety of factors unamenable for host cell survival, such as harsh industrial conditions, fermentation inhibitors from biomass hydrolysates, and toxic compounds including metabolic intermediates and valuable target products. Therefore, engineered microbes with robust phenotypes is essential for achieving higher yield and productivity. In this review, the recent advances in engineering robustness and tolerance of cell factories is described to cope with these issues and briefly introduce novel strategies with great potential to enhance the robustness of cell factories, including metabolic pathway balancing, transporter engineering, and adaptive laboratory evolution. This review also highlights the integration of advanced systems and synthetic biology principles toward engineering the harmony of overall cell function, more than the specific pathways or enzymes. © 2017 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  12. A tau-charm-factory at Argonne

    International Nuclear Information System (INIS)

    Norem, J.; Repond, J.

    1994-01-01

    In this paper we explore the possibility of building a tau-charm-factory at the Argonne National Laboratory. A tau-charm-factory is an e + e - collider with a center-of-mass energy between 3.0 GeV and 5.0 GeV and a luminosity of at least 1 x 10 33 cm -2 s -1 . Once operational, the facility will produce large samples of τ pairs, charm mesons, and charmonium with either negligible or well understood backgrounds. This will lead to high precision measurements in the second generation quark and the third generation lepton sectors that cannot be done at other facilities. Basic physical properties and processes, such as the tau neutrino mass, rare tau decays, charm decay constants, rare charm meson decays, neutral D 0 -- meson mixing, and many more will be studied with unique precision. An initial design of the collider including the injector system is described. The design shows that a luminosity of at least 1 x 10 33 cm -2 s -1 can be achieved over the entire center-of-mass energy range of the factory

  13. ENRAF Series 854 Advanced Technology Gauge (ATG) with SPU ll Card for Leak Detector Use Acceptance Test Procedure

    International Nuclear Information System (INIS)

    SMITH, S.G.

    1999-01-01

    The following Acceptance Test Procedure was written to test the Enraf Series 854 ATG with SPU-II card prior to installation in the Tank Farms. The procedure sets various parameters and verifies the gauge and the alarms functionality

  14. Test marketing and consumer acceptance of irradiated meat products

    International Nuclear Information System (INIS)

    Xu Zhicheng; Feng Zhixiong; Jiang Peizhen

    2001-01-01

    This study consists of two parts: irradiation processing of cooked meat and irradiation preservation of prepackaged chilled fresh cut meats. Irradiation of prepackaged pickled meat products dipped in grains stillage at a dose 6-8 kGy eliminated common food-borne microorganisms, such as E. Coli and other microbial pathogens and extended the shelf life of the product to 10 days at 5 deg. C. Test marketing of 40,000 bags (about 10,000 kg) of the product in more than 100 supermarkets in the city of Shanghai showed no untoward problem with consumer acceptance. Irradiation of prepackaged chilled fresh cut pork at a dose 3 kGy led to inactivation of microbial pathogens and parasites with a concomitant reduction in numbers of common spoilage microorganisms and extension of shelf life of the product for 30 days at 5 deg. C. The cost benefit and marketing applications were evaluated. (author)

  15. SYSTEMS BIOLOGY AND METABOLIC ENGINEERING OF ARTHROSPIRA CELL FACTORIES

    Directory of Open Access Journals (Sweden)

    Amornpan Klanchui

    2012-10-01

    Full Text Available Arthrospira are attractive candidates to serve as cell factories for production of many valuable compounds useful for food, feed, fuel and pharmaceutical industries. In connection with the development of sustainable bioprocessing, it is a challenge to design and develop efficient Arthrospira cell factories which can certify effective conversion from the raw materials (i.e. CO2 and sun light into desired products. With the current availability of the genome sequences and metabolic models of Arthrospira, the development of Arthrospira factories can now be accelerated by means of systems biology and the metabolic engineering approach. Here, we review recent research involving the use of Arthrospira cell factories for industrial applications, as well as the exploitation of systems biology and the metabolic engineering approach for studying Arthrospira. The current status of genomics and proteomics through the development of the genome-scale metabolic model of Arthrospira, as well as the use of mathematical modeling to simulate the phenotypes resulting from the different metabolic engineering strategies are discussed. At the end, the perspective and future direction on Arthrospira cell factories for industrial biotechnology are presented.

  16. Proceedings of the 2-nd workshop on JINR tau-charm factory

    International Nuclear Information System (INIS)

    Aleksandrov, V.S.; Perel'shtejn, E.A.

    1993-01-01

    Application of tau-charm factory for investigation of hadronic decay and charged leptonic weak interaction is considered. JINR tau-charm-factory design and magnetic and vacuum systems of the booster ring are described. New types of silicon microstrip detector sand BGO-counters developed for tau-charm-factory are proposed

  17. The assessment of the impact of socio-economic factors in accepting cancer using the Acceptance of Illness Scale (AIS).

    Science.gov (United States)

    Czerw, Aleksandra I; Bilińska, Magdalena; Deptała, Andrzej

    2016-01-01

    The paper presents the results of examining the level of acceptance of the illness in cancer patients using the Acceptance of Illness Scale (AIS). The study involved cancer patients treated at the Central Clinical Hospital of the Ministry the Interior in Warsaw in 2014. The questionnaire comprised basic demographic questions (socio-economic factors) and the AIS test estimating the level of illness acceptance in patients. For the group of patients in the research group, the arithmetic mean amounted to 27.56 points. The period of time that elapsed between the first cancer diagnosis and the start of the study did not influence the score of accepting illness. The acceptance of illness in patients diagnosed with metastases differed from the acceptance of illness by patients diagnosed with metastatic cancer. Females obtained the average of 29.59 in the AIS test, whereas the average in male patients was 26.17. The patients' age did not impact the AIS test. There were no differences in the AIS test results between a group of people with secondary education and a group of people with higher education. There were no differences in the AIS test results between employed individuals versus pensioners. The inhabitants of cities were characterized by the highest degree of acceptance of their health condition. The lowest degree of acceptance of illness was observed in the group with the lowest average incomes. In the group of married individuals the average degree of acceptance of illness amounted to 27.37 points. The average degree of acceptance of illness in patients that declared themselves as single amounted to 25.75. The average degree of acceptance of illness in the study group was 27.56 points, which is a relatively high level of acceptance of cancer. The main socio-economic factor, which influenced the AIS test results was whether metastases were diagnosed or not. There were no differences between patients in groups where the time that elapsed from the first diagnosis of

  18. The assessment of the impact of socio-economic factors in accepting cancer using the Acceptance of Illness Scale (AIS

    Directory of Open Access Journals (Sweden)

    Aleksandra I. Czerw

    2015-11-01

    Full Text Available Aim of the study : The paper presents the results of examining the level of acceptance of the illness in cancer patients using the Acceptance of Illness Scale (AIS. Materials and methods: The study involved cancer patients treated at the Central Clinical Hospital of the Ministry the Interior in Warsaw in 2014. The questionnaire comprised basic demographic questions (socio-economic factors and the AIS test estimating the level of illness acceptance in patients. Results : For the group of patients in the research group, the arithmetic mean amounted to 27.56 points. The period of time that elapsed between the first cancer diagnosis and the start of the study did not influence the score of accepting illness. The acceptance of illness in patients diagnosed with metastases differed from the acceptance of illness by patients diagnosed with metastatic cancer. Females obtained the average of 29.59 in the AIS test, whereas the average in male patients was 26.17. The patients’ age did not impact the AIS test. There were no differences in the AIS test results between a group of people with secondary education and a group of people with higher education. There were no differences in the AIS test results between employed individuals versus pensioners. The inhabitants of cities were characterized by the highest degree of acceptance of their health condition. The lowest degree of acceptance of illness was observed in the group with the lowest average incomes. In the group of married individuals the average degree of acceptance of illness amounted to 27.37 points. The average degree of acceptance of illness in patients that declared themselves as single amounted to 25.75. Conclusions : The average degree of acceptance of illness in the study group was 27.56 points, which is a relatively high level of acceptance of cancer. The main socio-economic factor, which influenced the AIS test results was whether metastases were diagnosed or not. There were no

  19. Test performance and acceptability of self- versus provider-collected swabs for high-risk HPV DNA testing in female-to-male trans masculine patients.

    Science.gov (United States)

    Reisner, Sari L; Deutsch, Madeline B; Peitzmeier, Sarah M; White Hughto, Jaclyn M; Cavanaugh, Timothy P; Pardee, Dana J; McLean, Sarah A; Panther, Lori A; Gelman, Marcy; Mimiaga, Matthew J; Potter, Jennifer E

    2018-01-01

    High-risk human papillomavirus (hrHPV) causes virtually all cervical cancers. Trans masculine (TM) people (those assigned female at birth who identify with a gender other than female) have low uptake of conventional cervical cancer screening. Self-collected hrHPV DNA testing has high levels of acceptability among cisgender (non-transgender) females and may support increased cervical cancer screening uptake in TM individuals. To assess the test performance and acceptability of self-collected vaginal specimens in comparison to provider-collected cervical swabs for hrHPV DNA detection in TM individuals ages 21-64 years. Between March 2015-September 2016, 150 TM participants with a cervix (mean age = 27.5 years; SD = 5.7) completed a one-time study visit comprised of a self-report survey, self-collected vaginal HPV DNA swab, clinician-administered cervical HPV swab, and brief interview on acceptability of clinical procedures. Participants were randomized to complete either self- or provider-collection first to minimize ordering effects. Self- and provider-collected samples were tested for 13 hrHPV DNA types using a DNA Hybridization Assay. The primary outcome variable was the concordance (kappa statistic) and performance (sensitivity, specificity) of self-collected vaginal HPV DNA specimens versus provider-collected cervical HPV swabs as the gold standard. Of the 131 participants completing both the self- and provider-collected HPV tests, 21 cases of hrHPV were detected by the provider cervical swab (gold standard; 16.0% hrHPV prevalence); 15 of these cases were accurately detected by the self-collected vaginal swab (71.4% concordance) (Kappa = 0.75, 95% Confidence Interval [CI]: 0.59, 0.92; p<0.001). Compared to the provider-collected cervical hrHPV DNA sample (gold standard), the self-collected vaginal hrHPV DNA test demonstrated a sensitivity of 71.4% (95% CI: 0.52, 0.91; p = 0.0495) and specificity of 98.2% (95% CI: 0.96, 1.00; p<0.0001). Over 90% of participants

  20. Factorial Analysis of Profitability

    OpenAIRE

    Georgeta VINTILA; Ilie GHEORGHE; Ioana Mihaela POCAN; Madalina Gabriela ANGHEL

    2012-01-01

    The DuPont analysis system is based on decomposing the profitability ratio in factors of influence. This paper describes the factorial analysis of profitability based on the DuPont system. Significant importance is given to the impact on various indicators on the shares value and profitability.

  1. Nuclear physics at the KAON factory

    International Nuclear Information System (INIS)

    Kitching, R.

    1989-05-01

    The author surveys the range of nuclear physics issues which can be addressed with a high intensity hadron facility such as the KAON factory. He discusses hadron spectroscopy, kaon scattering, hypernuclear physics, spin physics, and nuclear physics with neutrinos. Nuclear Physics is defined rather broadly, encompassing the study of strongly interacting systems, and including the structure of individual hadrons, hadron-hadron interactions, hadronic weak and electromagnetic currents (in nuclei too), conventional nuclear structure, and exotic nuclei. The basic theme is how the KAON Factory can shed light on non-perturbative QCD and its relation to conventional nuclear physics

  2. Phenomenology of neutrino oscillations at the neutrino factory

    International Nuclear Information System (INIS)

    Tang, Jian

    2011-01-01

    We consider the prospects for a neutrino factory measuring mixing angles, the CP violating phase and mass-squared differences by detecting wrong-charge muons arising from the chain μ + → ν e → ν μ → μ - and the right-charge muons coming from the chain μ + → anti ν μ → anti ν μ → μ - (similar to μ - chains), where ν e → ν μ and anti ν μ → anti ν μ are neutrino oscillation channels through a long baseline. First, we study physics with near detectors and consider the treatment of systematic errors including cross section errors, flux errors, and background uncertainties. We illustrate for which measurements near detectors are required, discuss how many are needed, and what the role of the flux monitoring is. We demonstrate that near detectors are mandatory for the leading atmospheric parameter measurements if the neutrino factory has only one baseline, whereas systematic errors partially cancel if the neutrino factory complex includes the magic baseline. Second, we perform the baseline and energy optimization of the neutrino factory including the latest simulation results from the magnetized iron neutrino detector (MIND). We also consider the impact of τ decays, generated by appearance channels ν μ → ν τ and ν e → ν τ , on the discovery reaches of the mass orderings, the leptonic CP violation, and the non-zero θ 13 , which we find to be negligible for the considered detector. Third, we make a comparison of a high energy neutrino factory to a low energy neutrino factory and find that they are just two versions of the same experiment optimized for different regions of the parameter space. In addition, we briefly comment on whether it is useful to build the bi-magic baseline at the low energy neutrino factory. Finally, the effects of one additional massive sterile neutrino are discussed in the context of a combined short and long baseline setup. It is found that near detectors can provide the required sensitivity at the

  3. Propiedades psicométricas y estructura factorial de la escala de aprendizaje autorregulado (EAA en adolescentes

    Directory of Open Access Journals (Sweden)

    María Antonieta Elvira-Valdes

    2015-01-01

    Full Text Available En este artículo de investigación se analizan las propiedades psicométricas y la estructura factorial de la Escala de Aprendizaje Autorregulado (EAA, diseñada para medir atributos o dimensiones autorregulatorias en el aprendizaje. La Escala fue aplicada a una muestra de 402 adolescentes, estudiantes de los últimos años de secundaria. La fiabilidad del instrumento mostró valores satisfactorios, con un Alfa de Cronbach de ,842. Mediante el análisis factorial de componentes principales, se identificaron cuatro factores consistentes con la teoría de la autorregulación. Los resultados del análisis factorial confirmatorio mostraron índices de ajuste que apoyan el modelo teórico de atributos del aprendizaje autorregulado y un modelo unifactorial para la medición del constructo, cuyo ajuste adecuado puede permitir su uso con fines investigativos en el contexto local y latinoamericano. Abstract Analyzed psychometric properties and factorial structures designed to measure learning dimensions and attributes using self-regulated learning scale (EAA are discussed in this research paper. 402 high school teenagers in high school were sampled; the test showed satisfactory results and the reliability instrument was Cronbach Alpha: 842. Through a factorial analysis of main components, four factors based on self regulation theory were indentified. The results of this factorial analysis showed high rates of learning and self-regulated theoretical attributes along with a factor model for measuring the building blocks for which appropriate adjustment may allow its use for future research purposes in local and Latin environments.

  4. Hazardous factories: Nigerian evidence.

    Science.gov (United States)

    Oloyede, Olajide

    2005-06-01

    The past 15 years have seen an increasing governmental and corporate concern for the environment worldwide. For governments, information about the environmental performance of the industrial sector is required to inform macro-level decisions about environmental targets such as those required to meet UN directives. However, in many African, Asian, and Latin American countries, researching and reporting company environmental performance is limited. This article serves as a contribution to filling the gap by presenting evidence of physical and chemical risk in Nigerian factories. One hundred and three factories with a total of 5,021 workers were studied. One hundred and twenty physical and chemical hazards were identified and the result shows a high number of workers exposed to such hazards. The study also reveals that workers' awareness level of chemical hazards was high. Yet the danger was perceived in behavioral terms, especially by manufacturing firms, which tend to see environmental investment in an increasingly global economy as detrimental to profitability.

  5. Optimization of the general acceptability though affective tests and response surface methodology of a dry cacao powder mixture based beverage

    Directory of Open Access Journals (Sweden)

    Elena Chau Loo Kung

    2013-09-01

    Full Text Available This research work had as main objective optimizing the general acceptability though affective tests and response surface methodology of a dry cacao powder mixture based beverage. We obtained formulations of mixtures of cacao powder with different concentrations of 15%, 17.5% and 20%, as well as lecithin concentrations of 0.1%; 0.3%; and 0.5% maintaining a constant content of sugar (25 %, Vanillin (1% that included cacao powder with different pH values: natural (pH 5 and alkalinized (pH 6.5 and pH 8 and water by difference to 100%, generating a total of fifteen treatments to be evaluated, according to the Box-Behnen design for three factors. The treatments underwent satisfaction level tests to establish the general acceptability. The treatment that included cacao powder with a concentration of 17.5 %, pH 6.5 and lecithin concentration of 0.3 % obtained the best levels of acceptability. The software Statgraphics Plus 5.1 was used to obtain the treatment with maximum acceptability that corresponded to cacao powder with pH 6.81, with a concentration of 18.24 % and soy lecithin in 0.28% with a tendency to what was obtained in the satisfaction levels tests. Finally we characterized in a physical-chemistry and microbiological way the optimum formulation as well as evaluated sensitively obtaining an acceptability of 6.17.

  6. Gerontechnology acceptance by elderly Hong Kong Chinese: a senior technology acceptance model (STAM).

    Science.gov (United States)

    Chen, Ke; Chan, Alan Hoi Shou

    2014-01-01

    The purpose of this study was to develop and test a senior technology acceptance model (STAM) aimed at understanding the acceptance of gerontechnology by older Hong Kong Chinese people. The proposed STAM extended previous technology acceptance models and theories by adding age-related health and ability characteristics of older people. The proposed STAM was empirically tested using a cross-sectional questionnaire survey with a sample of 1012 seniors aged 55 and over in Hong Kong. The result showed that STAM was strongly supported and could explain 68% of the variance in the use of gerontechnology. For older Hong Kong Chinese, individual attributes, which include age, gender, education, gerontechnology self-efficacy and anxiety, and health and ability characteristics, as well as facilitating conditions explicitly and directly affected technology acceptance. These were better predictors of gerontechnology usage behaviour (UB) than the conventionally used attitudinal factors (usefulness and ease of use).

  7. Meson factories

    International Nuclear Information System (INIS)

    Dicello, J.F.; Zaider, M.; Bradbury, J.N.

    1979-01-01

    Technological improvements in accelerator design in the 1960's resulted in the capability to develop medium-energy proton accelerators with beam intensities of almost 1 mA. These beams are able to produce fluxes of secondary particles, including pions, muons, neutrinos, and neutrons, which are as much as 10,000 times as intense as those previously available. Those machines built for optimum meson production are commonly called meson factories. The characteristics of these facilities are reviewed, and the present programs in applied research, and some potential areas of future work are discussed

  8. Inspection Program Development for an Aircraft Fleet and an Airline on the Basis of the Acceptance Fatigue Test Result

    Directory of Open Access Journals (Sweden)

    Paramonov Yuri

    2015-02-01

    Full Text Available An inspection interval planning is considered in order to limit the probability of any fatigue failure (FFP in a fleet of N aircraft (AC and to provide an economical effectiveness of airline (AL under the limitation of fatigue failure rate (FFR. A solution of these two problems is based on the processing of the result of acceptance fatigue test of a new type of aircraft. During this test an estimate of the parameter ϴ, of a fatigue crack growth trajectory has been obtained. If the result of this acceptance test is too bad then this new type of aircraft will not be used in service. A redesign of this project should be done. If the result the acceptance test is pretty good then the reliability of the aircraft fleet and the airline will be provided without inspections. For this strategy there is a maximum of FFP (a maximum of FFR as a function of an unknown parameter ᶿ. This maximum can be limited by the use of the offered here procedure of the choice of the inspection number. The economic effectiveness of the AL operation is considered using the theory of Markov process with rewords.

  9. Assessment of The Asphalt Produced in Some Factories of Asphalt in Al-Hilla City

    Directory of Open Access Journals (Sweden)

    Mohammed Karem Abd

    2018-02-01

    Full Text Available The purpose of this study is to present an evaluation of  the properties and characteristics of asphalt concrete of several hot mix asphalt (HMA from five factories in Al-Hilla city. The research is divided into two parts. The first part included the laboratory analysis of samples. The second part is evaluation of results according to standard specifications.      The test results included (Asphalt content percent, stability, creep compliance, voids ratio, density, flow, crushed aggregate percent, Loss Angless abrasion and SO3 percent.The results of laboratorial tests indicated that all properties of asphalt mixes were susceptible and possible to be used in the asphaltic roads. The mixes types prepared and tested according to Marshall method. The values of Marshall stability, creep and density are (9.4, 5.4, 9.8, 9, 8.6, (2.5, 2.7, 2.7, 2.6, 2.3 and (2.334, 2.336, 2.337, 2.333, 2.338 with asphalt content between (4.2 to 4.6 % for all asphalt mixes of different factories.

  10. Accuracy and user-acceptability of HIV self-testing using an oral fluid-based HIV rapid test.

    Directory of Open Access Journals (Sweden)

    Oon Tek Ng

    Full Text Available BACKGROUND: The United States FDA approved an over-the-counter HIV self-test, to facilitate increased HIV testing and earlier linkage to care. We assessed the accuracy of self-testing by untrained participants compared to healthcare worker (HCW testing, participants' ability to interpret sample results and user-acceptability of self-tests in Singapore. METHODOLOGY/PRINCIPAL FINDINGS: A cross-sectional study, involving 200 known HIV-positive patients and 794 unknown HIV status at-risk participants was conducted. Participants (all without prior self-test experience performed self-testing guided solely by visual instructions, followed by HCW testing, both using the OraQuick ADVANCE Rapid HIV 1/2 Antibody Test, with both results interpreted by the HCW. To assess ability to interpret results, participants were provided 3 sample results (positive, negative, and invalid to interpret. Of 192 participants who tested positive on HCW testing, self-testing was positive in 186 (96.9%, negative in 5 (2.6%, and invalid in 1 (0.5%. Of 794 participants who tested negative on HCW testing, self-testing was negative in 791 (99.6%, positive in 1 (0.1%, and invalid in 2 (0.3%. Excluding invalid tests, self-testing had sensitivity of 97.4% (95% CI 95.1% to 99.7% and specificity of 99.9% (95% CI: 99.6% to 100%. When interpreting results, 96%, 93.1% and 95.2% correctly read the positive, negative and invalid respectively. There were no significant demographic predictors for false negative self-testing or wrongly interpreting positive or invalid sample results as negative. Eighty-seven percent would purchase the kit over-the-counter; 89% preferred to take HIV tests in private. 72.5% and 74.9% felt the need for pre- and post-test counseling respectively. Only 28% would pay at least USD15 for the test. CONCLUSIONS/SIGNIFICANCE: Self-testing was associated with high specificity, and a small but significant number of false negatives. Incorrectly identifying model results as

  11. [Cognitive mechanisms and self-acceptance of body image].

    Science.gov (United States)

    Anuel, Adriana; Bracho, Angie; Brito, Nereida; Rondón, José Eduardo; Sulbarán, Dimas

    2012-01-01

    This research proposed to investigate the effect of an intervention program to strengthen self-acceptance (positive), and a cognitive intervention program on body image. Specifically, it is based on the idea of prevention of risk factors for eating disorders from the perspective of normalcy in the prevention of body dissatisfaction. We used a 2×2 factorial design with 120 participants of both sexes, aged between 10 and 12 years, selected by stratification. To evaluate the hypothesis, we used two-way analysis of variance. The results concluded that only the cognitive intervention program affected the dependent variable body image, maintaining its statistical significance, which is revealed both in the general two-way ANOVA and when controlling the effect of the covariates, age and sex.

  12. Acceptability and Feasibility of Sexually Transmitted Infection Testing and Treatment among Pregnant Women in Gaborone, Botswana, 2015

    Directory of Open Access Journals (Sweden)

    Adriane Wynn

    2016-01-01

    Full Text Available Introduction. Chlamydia trachomatis (CT, Neisseria gonorrhoeae (NG, and Trichomonas vaginalis (TV are curable sexually transmitted infections (STIs that can cause adverse maternal and birth outcomes. Most countries do not conduct routine testing during antenatal care. We present data on the acceptability and feasibility of testing and treating pregnant women for STIs in an antenatal clinic in Gaborone, Botswana. Materials and Methods. We offered CT, NG, and TV testing using self-collected vaginal swabs to eligible pregnant women. Participants received same-day test results. Those who tested positive were given treatment. Results. Among the 225 women who were eligible and recruited, 200 (89% agreed to participate. The median age of our study sample was 30 years; most were unmarried (77%, with a median gestational age of 27 weeks and a 23% HIV prevalence. All participants received their results with at least 72% (n=143 on the same day. Thirty participants (15% tested positive for an STI, all were treated, and 24 (80% were treated on the same day. Conclusion. The acceptability of STI testing was high, and the intervention was feasible. This study provides support for continued research into STI prevalence, cost-effectiveness, and the association of STIs with adverse maternal and infant outcomes.

  13. Project W-314 specific test and evaluation plan for AZ tank farm upgrades

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-631 transfer line from the AZ-O1A pit to the AZ-02A pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation P1 an (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities, etc), Factory Tests and Inspections (FTIs), installation tests and inspections, Construction Tests and Inspections (CTIs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). The STEP will be utilized in conjunction with the TEP for verification and validation

  14. Food-Energy Interactive Tradeoff Analysis of Sustainable Urban Plant Factory Production Systems

    Directory of Open Access Journals (Sweden)

    Li-Chun Huang

    2018-02-01

    Full Text Available This research aims to analyze the food–energy interactive nexus of sustainable urban plant factory systems. Plant factory systems grow agricultural products within artificially controlled growing environment and multi-layer vertical growing systems. The system controls the supply of light, temperature, humidity, nutrition, water, and carbon dioxide for growing plants. Plant factories are able to produce consistent and high-quality agricultural products within less production space for urban areas. The production systems use less labor, pesticide, water, and nutrition. However, food production of plant factories has many challenges including higher energy demand, energy costs, and installation costs of artificially controlled technologies. In the research, stochastic optimization model and linear complementarity models are formulated to conduct optimal and equilibrium food–energy analysis of plant factory production. A case study of plant factories in the Taiwanese market is presented.

  15. Investigation of cadmium pollution in the spruce saplings near the metal production factory.

    Science.gov (United States)

    Hashemi, Seyed Armin; Farajpour, Ghasem

    2016-02-01

    Toxic metals such as lead and cadmium are among the pollutants that are created by the metal production factories and disseminated in the nature. In order to study the quantity of cadmium pollution in the environment of the metal production factories, 50 saplings of the spruce species at the peripheries of the metal production factories were examined and the samples of the leaves, roots, and stems of saplings planted around the factory and the soil of the environment of the factory were studied to investigate pollution with cadmium. They were compared to the soil and saplings of the spruce trees planted outside the factory as observer region. The results showed that the quantity of pollution in the leaves, stems, and roots of the trees planted inside the factory environment were estimated at 1.1, 1.5, and 2.5 mg/kg, respectively, and this indicated a significant difference with the observer region (p metal production factory was estimated at 6.8 mg/kg in the depth of 0-10 cm beneath the level of the soil. The length of roots in the saplings planted around the factory of metal production stood at 11 and 14.5 cm in the observer region which had a significant difference with the observer region (p production processes in the factory. © The Author(s) 2013.

  16. A biophysical model for transcription factories

    International Nuclear Information System (INIS)

    Canals-Hamann, Ana Z; Neves, Ricardo Pires das; Reittie, Joyce E; Iñiguez, Carlos; Soneji, Shamit; Enver, Tariq; Buckle, Veronica J; Iborra, Francisco J

    2013-01-01

    Transcription factories are nuclear domains where gene transcription takes place although the molecular basis for their formation and maintenance are unknown. In this study, we explored how the properties of chromatin as a polymer may contribute to the structure of transcription factories. We found that transcriptional active chromatin contains modifications like histone H4 acetylated at Lysine 16 (H4K16ac). Single fibre analysis showed that this modification spans the entire body of the gene. Furthermore, H4K16ac genes cluster in regions up to 500 Kb alternating active and inactive chromatin. The introduction of H4K16ac in chromatin induces stiffness in the chromatin fibre. The result of this change in flexibility is that chromatin could behave like a multi-block copolymer with repetitions of stiff-flexible (active-inactive chromatin) components. Copolymers with such structure self-organize through spontaneous phase separation into microdomains. Consistent with such model H4K16ac chromatin form foci that associates with nascent transcripts. We propose that transcription factories are the result of the spontaneous concentration of H4K16ac chromatin that are in proximity, mainly in cis

  17. Neutrinos: from the Workshop to the Factory

    CERN Multimedia

    2001-01-01

    Over the next 5 years much work will be done to reach a theoretical and practical description of a neutrino factory. How could this project turn out to be an interesting future option for CERN? Neutrino beams travelling from CERN to the Canary Islands? And to the Svalbard archipelago in Norway? Or even to the Pyhaesalmi Mine in Finland? Why neutrinos? And why so far? The answers provide one of CERN's next challenging options: the construction of a high-energy muon storage ring to provide neutrino beams. This project, nicknamed 'neutrino factory', now figures in CERN's middle term plan as a recognized and supported research and development project. International collaborations, with other European laboratories and also with America and Japan, are now being set up. Long baseline locations for neutrino oscillations studies at a CERN based neutrino factory. Early in its history, LEP established that there exist just three kinds of light neutrinos, those associated with the electron, muon, and tau leptons. For a...

  18. Social trust, risk perceptions and public acceptance of recycled water: testing a social-psychological model.

    Science.gov (United States)

    Ross, Victoria L; Fielding, Kelly S; Louis, Winnifred R

    2014-05-01

    Faced with a severe drought, the residents of the regional city of Toowoomba, in South East Queensland, Australia were asked to consider a potable wastewater reuse scheme to supplement drinking water supplies. As public risk perceptions and trust have been shown to be key factors in acceptance of potable reuse projects, this research developed and tested a social-psychological model of trust, risk perceptions and acceptance. Participants (N = 380) were surveyed a few weeks before a referendum was held in which residents voted against the controversial scheme. Analysis using structural equation modelling showed that the more community members perceived that the water authority used fair procedures (e.g., consulting with the community and providing accurate information), the greater their sense of shared identity with the water authority. Shared social identity in turn influenced trust via increased source credibility, that is, perceptions that the water authority is competent and has the community's interest at heart. The findings also support past research showing that higher levels of trust in the water authority were associated with lower perceptions of risk, which in turn were associated with higher levels of acceptance, and vice versa. The findings have a practical application for improving public acceptance of potable recycled water schemes. Copyright © 2014 Elsevier Ltd. All rights reserved.

  19. Incense and Joss Stick Making in Small Household Factories, Thailand

    Directory of Open Access Journals (Sweden)

    S Siripanich

    2014-07-01

    Full Text Available Background: Incense and joss stick are generally used in the world. Most products were made in small household factories. There are many environmental and occupational hazards in these factories. Objective: To evaluate the workplace environmental and occupational hazards in small household incense and joss stick factories in Roi-Et, Thailand. Methods: Nine small household factories in rural areas of Roi-Et, Thailand, were studied. Dust concentration and small aerosol particles were counted through real time exposure monitoring. The inductively coupled plasma optical emission spectrometry (ICP-OES was used for quantitative measurement of heavy metal residue in incense products. Results: Several heavy metals were found in dissolved dye and joss sticks. Those included barium, manganese, and lead. Rolling and shaking processes produced the highest concentration of dust and aerosols. Only 3.9 % of female workers used personal protection equipment. Conclusion: Dust and chemicals were major threats in small household incense and joss stick factories in Thailand. Increasing awareness towards using personal protection equipment and emphasis on elimination of environmental workplace hazards should be considered to help the workers of this industry.

  20. Byssinosis and COPD rates among factory workers manufacturing hemp and jute

    Directory of Open Access Journals (Sweden)

    Mukremin Er

    2016-02-01

    Full Text Available Objectives: Prior studies have been performed on cotton textile plants throughout the world. This study was planned to identify the rate of byssinosis and chronic obstructive pulmonary disease (COPD in hemp and jute workers and those who worked with both of them. Material and Methods: The study was realized in a factory which consecutively processed hemp and jute. The study enrollment included 266 people, 164 of whom were active workers and 102 were retired. A questionnaire, plain chest X-rays, physical examination and pulmonary function tests were performed. Dust levels were measured in various sections of the factory during 8 h work shifts. Endotoxin levels of various quality hemp fibers and dusts were measured. Results: The rate of byssinosis (28.2% was higher among the workers that who exposed to both jute and hemp dust. The frequency of chronic bronchitis in retired workers who previously smoked was higher (20% as compared to currently smoking workers (17%. High dust levels were measured in some parts of the factory (mean (M = 2.69 mg/m3. Working in dense dust areas, active smoking, being older than 40 years of age, being an ex-smoker, and working in the factory for a period exceeding 15 years were significantly associated with bronchitis and emphysema development. High endotoxin levels were determined for fine hemp dust (605 EU/mg, coarse hemp dust (336 EU/mg and poor quality hemp fibers (114 EU/mg, whereas in fresh hemp stalks the level of endotoxin was determined to be lower (0.27 EU/mg. Conclusions: Because of high exposures to jute and hemp dusts that are associated with high byssinosis rates, personal protection and environmental hygiene is crucial to prevention of byssinosis.

  1. Acceptance procedures: Microfilm printer

    Science.gov (United States)

    Lockwood, H. E.

    1973-01-01

    Acceptance tests were made for a special order automatic additive color microfilm printer. Tests include film capacity, film transport, resolution, illumination uniformity, exposure range checks, and color cuing considerations.

  2. 29 CFR 779.347 - Exemption limited to “recognized retail establishment”; factories not exempt.

    Science.gov (United States)

    2010-07-01

    ... under the exemption are custom tailor shops, candy shops, ice cream parlors, bakeries, drug stores, optometrist establishments, retail ice plants and other local retail establishments which make or process the... industry. This test limits the exemption to retail establishments only, and excludes factories as such and...

  3. The Physics of the B Factories

    Energy Technology Data Exchange (ETDEWEB)

    Bevan, A.J. [Queen Mary Univ., London (United Kingdom); Golob, B. [Ljubljana Univ. (Slovenia). Faculty of Mathematics and Physics; J. Stefan Institute, Ljubljana (Slovenia); Mannel, T. [Siegen Univ. (Germany). Theoretische Physik 1; Collaboration: BABAR Collaboration; Belle Collaboration; and others

    2014-11-15

    The inspiration for this book came from Fran@cois le Diberder. During his term as spokesperson for BABAR he laid down a vision for the two B Factory detector collaborations, BABAR and Belle, to work together on a book that would describe the methodologies used and physics results obtained by those experiments. A key ideal emphasized from the outset was that this book should be written from a pedagogical perspective; it should be of interest to the student and expert alike. This vision was presented during a BABAR collaboration meeting on the island of Elba in May 2008 and a follow up Belle collaboration meeting at KEK, with visiting colleagues from the BABAR collaboration, and was embraced by the community. A number of workshops involving people from the theoretical community as well as the two collaborations were held on four continents over the following years. The resulting book, ''The Physics of the B Factories'', is a testament to the way that this concept captured the zeitgeist on both sides of the Pacific Ocean. This book is divided into three parts, the first of which provides a brief description of the B Factories, including a short (though not exhaustive) historical perspective, as well as descriptions of the detectors, ancillary data acquisition systems and data (re)processing systems that were built by the two detector collaborations in the late 1990's. The second part of the book discusses tools and methods that are frequently used when analyzing the data collected. These range from details of low level reconstruction algorithms and abstract summaries of statistical methods to high level prescriptions used when evaluating systematic uncertainties on measurements of observables. The third part of the book is devoted to physics results. This includes sufficient theoretical discussion in order for the reader to understand the context of the work being described. We are indebted to our colleagues from the theoretical community who

  4. Phenomenology of neutrino oscillations at the neutrino factory

    Energy Technology Data Exchange (ETDEWEB)

    Tang, Jian

    2011-12-19

    We consider the prospects for a neutrino factory measuring mixing angles, the CP violating phase and mass-squared differences by detecting wrong-charge muons arising from the chain {mu}{sup +} {yields} {nu}{sub e} {yields} {nu}{sub {mu}} {yields} {mu}{sup -} and the right-charge muons coming from the chain {mu}{sup +} {yields} anti {nu}{sub {mu}} {yields} anti {nu}{sub {mu}} {yields} {mu}{sup -} (similar to {mu}{sup -} chains), where {nu}{sub e} {yields} {nu}{sub {mu}} and anti {nu}{sub {mu}} {yields} anti {nu}{sub {mu}} are neutrino oscillation channels through a long baseline. First, we study physics with near detectors and consider the treatment of systematic errors including cross section errors, flux errors, and background uncertainties. We illustrate for which measurements near detectors are required, discuss how many are needed, and what the role of the flux monitoring is. We demonstrate that near detectors are mandatory for the leading atmospheric parameter measurements if the neutrino factory has only one baseline, whereas systematic errors partially cancel if the neutrino factory complex includes the magic baseline. Second, we perform the baseline and energy optimization of the neutrino factory including the latest simulation results from the magnetized iron neutrino detector (MIND). We also consider the impact of {tau} decays, generated by appearance channels {nu}{sub {mu}} {yields} {nu}{sub {tau}} and {nu}{sub e} {yields} {nu}{sub {tau}}, on the discovery reaches of the mass orderings, the leptonic CP violation, and the non-zero {theta}{sub 13}, which we find to be negligible for the considered detector. Third, we make a comparison of a high energy neutrino factory to a low energy neutrino factory and find that they are just two versions of the same experiment optimized for different regions of the parameter space. In addition, we briefly comment on whether it is useful to build the bi-magic baseline at the low energy neutrino factory. Finally, the

  5. Adaptation and Factorial Validation of the Attitudes Toward Gender Roles Scale

    Directory of Open Access Journals (Sweden)

    Claudia Andrade

    2016-04-01

    Full Text Available Abstract Attitudes toward gender roles result from a social construction process that has implications for the accepted gender role models for men and women. This study aims at the adaptation and factorial validation of a measurement scale for attitudes toward gender roles. The sample consisted of 746 college students and young professionals. Exploratory and confirmatory factor analyses were performed to check the scale's structure. A two-factor structure was found for the Attitudes toward Gender Roles Scale: the first factor reflects a traditional division of gender roles, and the second factor reflects an egalitarian division of gender roles. A preliminary study using the scale was conducted on 101 families with adult children (each family included a father, a mother, and an adult child with a university degree. The results revealed the importance of the scale in assessing the attitudes of different generations toward gender roles.

  6. Evaluation of a laser scanner for large volume coordinate metrology: a comparison of results before and after factory calibration

    International Nuclear Information System (INIS)

    Ferrucci, M; Muralikrishnan, B; Sawyer, D; Phillips, S; Petrov, P; Yakovlev, Y; Astrelin, A; Milligan, S; Palmateer, J

    2014-01-01

    Large volume laser scanners are increasingly being used for a variety of dimensional metrology applications. Methods to evaluate the performance of these scanners are still under development and there are currently no documentary standards available. This paper describes the results of extensive ranging and volumetric performance tests conducted on a large volume laser scanner. The results demonstrated small but clear systematic errors that are explained in the context of a geometric error model for the instrument. The instrument was subsequently returned to the manufacturer for factory calibration. The ranging and volumetric tests were performed again and the results are compared against those obtained prior to the factory calibration. (paper)

  7. Study of electroless nickel plating on PerFactoryTM rapid prototype model

    OpenAIRE

    J.C. Rajaguru; C. Au, M. Duke

    2012-01-01

    This paper presents an investigation of electroless nickel plating on PerFactoryTM rapid prototype model built on PerFactoryTM R05 material. PerFactoryTM R05 is acrylic based photo sensitive resin. It is a popular material in rapid prototyping using PerFactoryTM method which employs addictive manufacturing technique to build prototypes for visual inspection, assembly etc. Metallization of such a prototype can extend the application envelop of the rapid prototyping technique as they can be use...

  8. Acceptance test procedure for C-018H, 242-A evaporator/PUREX plant process condensate treatment facility

    International Nuclear Information System (INIS)

    Parrish, D.E.

    1994-01-01

    This Acceptance Test Procedure (ATP) has been prepared to demonstrate that the Electrical/Instrumentation system function as required for this facility. Each company or organization participating in this ATP will designate personnel to assume the responsibilities and duties as defined herein for their respective roles

  9. Testing Usability and Acceptability of a Web Application to Promote Physical Activity (iCanFit) Among Older Adults

    Science.gov (United States)

    Goldberg, Daniel; Dahlke, Deborah Vollmer; Ory, Marcia G; Cargill, Jessica S; Coughlin, Rachel; Hernandez, Edgar; Kellstedt, Debra K; Peres, S Camille

    2014-01-01

    Background Most older Americans do not exercise regularly and many have chronic conditions. Among an increasing number of fitness mobile and Web apps, few are designed for older adults with chronic conditions despite high ownership rates of mobile tools and Internet access in this population. We designed a mobile-enabled Web app, iCanFit, to promote physical activity in this population. Objective This study aimed to test the usability and acceptability of iCanFit among older adults in a community setting. Methods A total of 33 older adults (aged 60 to 82 years) were recruited from communities to test iCanFit. Of these 33, 10 participants completed the usability testing in a computer room of a senior community center. A research assistant timed each Web application task and observed user navigation behavior using usability metrics. The other 23 participants used the website on their own devices at home and provided feedback after 2-3 weeks by completing a user-experience survey assessing ease of use, helpfulness, and satisfaction with iCanFit. Results Participants completed all 15 tasks on the iCanFit site in an average of 31 (SD 6.9) minutes; some tasks required more time or needed assistance. Participants’ comments were addressed to improve the site’s senior friendliness and ease of use. In the user-experience survey, participants reported high levels of usefulness and satisfaction. More than 56% (13/23) of participants indicated they would continue using the program and recommend it to their families or friends. Conclusions Testing usability and acceptability is a very important step in developing age-appropriate and user-friendly Web apps, especially for older adults. Testing usability and acceptability in a community setting can help reveal users’ experiences and feedback in a real-life setting. Our study suggested that older adults had a high degree of acceptance of iCanFit and could use it easily. The efficacy trial of iCanFit is currently underway

  10. Performance of the JT-60SA cryogenic system under pulsed heat loads during acceptance tests

    Science.gov (United States)

    Hoa, C.; Bonne, F.; Roussel, P.; Lamaison, V.; Girard, S.; Fejoz, P.; Goncalves, R.; Vallet, J. C.; Legrand, J.; Fabre, Y.; Pudys, V.; Wanner, M.; Cardella, A.; Di Pietro, E.; Kamiya, K.; Natsume, K.; Ohtsu, K.; Oishi, M.; Honda, A.; Kashiwa, Y.; Kizu, K.

    2017-12-01

    The JT-60SA cryogenic system a superconducting tokamak currently under assembly at Naka, Japan. After one year of commissioning, the acceptance tests were successfully completed in October 2016 in close collaboration with Air Liquide Advanced Technologies (ALaT), the French atomic and alternative energies commission (CEA), Fusion for Energy (F4E) and the Quantum Radiological Science and Technology (QST). The cryogenic system has several cryogenic users at various temperatures: the superconducting magnets at 4.4 K, the current leads at 50 K, the thermal shields at 80 K and the divertor cryo-pumps at 3.7 K. The cryogenic system has an equivalent refrigeration power of about 9.5 kW at 4.5 K, with peak loads caused by the nuclear heating, the eddy currents in the structures and the AC losses in the magnets during cyclic plasma operation. The main results of the acceptance tests will be reported, with emphasis on the management of the challenging pulsed load operation using a liquid helium volume of 7 m3 as a thermal damper.

  11. RIKEN RI Beam Factory project

    Energy Technology Data Exchange (ETDEWEB)

    Yano, Yasushige; Goto, Akira; Katayama, Takeshi [Institute of Physical and Chemical Research, Wako, Saitama (Japan)

    1997-03-01

    The RARF proposes `RIKEN RI Beam Factory` as a next facility-expanding project. The factory makes it the primary aim to provide RI (Radioactive Isotope) beams covering over the whole atomic-mass range with the world-highest intensity in a wide energy range up to several hundreds MeV/nucleon. These RI beams are generated by the fragmentation of high-intensity heavy-ion beams. For the efficient production heavy-ion energies will be boosted up to over 100 MeV/nucleon even for very heavy ions by a K2500-MeV superconducting ring cyclotron serving as a post accelerator of the existing K540-MeV ring cyclotron. A new type of experimental installation called `MUSES` (Multi-USe Experimental Storage rings) will be constructed as well. With MUSES, various types of unique colliding experiments will become possible. (author)

  12. Several submaximal exercise tests are reliable, valid and acceptable in people with chronic pain, fibromyalgia or chronic fatigue: a systematic review.

    Science.gov (United States)

    Ratter, Julia; Radlinger, Lorenz; Lucas, Cees

    2014-09-01

    Are submaximal and maximal exercise tests reliable, valid and acceptable in people with chronic pain, fibromyalgia and fatigue disorders? Systematic review of studies of the psychometric properties of exercise tests. People older than 18 years with chronic pain, fibromyalgia and chronic fatigue disorders. Studies of the measurement properties of tests of physical capacity in people with chronic pain, fibromyalgia or chronic fatigue disorders were included. Studies were required to report: reliability coefficients (intraclass correlation coefficient, alpha reliability coefficient, limits of agreements and Bland-Altman plots); validity coefficients (intraclass correlation coefficient, Spearman's correlation, Kendal T coefficient, Pearson's correlation); or dropout rates. Fourteen studies were eligible: none had low risk of bias, 10 had unclear risk of bias and four had high risk of bias. The included studies evaluated: Åstrand test; modified Åstrand test; Lean body mass-based Åstrand test; submaximal bicycle ergometer test following another protocol other than Åstrand test; 2-km walk test; 5-minute, 6-minute and 10-minute walk tests; shuttle walk test; and modified symptom-limited Bruce treadmill test. None of the studies assessed maximal exercise tests. Where they had been tested, reliability and validity were generally high. Dropout rates were generally acceptable. The 2-km walk test was not recommended in fibromyalgia. Moderate evidence was found for reliability, validity and acceptability of submaximal exercise tests in patients with chronic pain, fibromyalgia or chronic fatigue. There is no evidence about maximal exercise tests in patients with chronic pain, fibromyalgia and chronic fatigue. Copyright © 2014. Published by Elsevier B.V.

  13. JINR studies for a Tau-Charm Factory

    International Nuclear Information System (INIS)

    Chelkov, G.

    1994-01-01

    This paper touches on work being done a JINR relevant to a proposal for construction of a tau charm factory, and its attendant detector system. A workshop on such a device was held at JINR in 1992, and here the author touches on questions of what one wants to learn about tau particles from such a machine, the charge to the group looking at a detector design for such a facility, the general conclusions of the JINR study, and a status report of work on the JINR Tau Charm Factory project

  14. PowerFactory applications for power system analysis

    CERN Document Server

    Gonzalez-Longatt, Francisco

    2014-01-01

    This book presents a comprehensive set of guidelines and applications of DIgSILENT PowerFactory, an advanced power system simulation software package, for different types of power systems studies. Written by specialists in the field, it combines expertise and years of experience in the use of DIgSILENT PowerFactory with a deep understanding of power systems analysis. These complementary approaches therefore provide a fresh perspective on how to model, simulate and analyse power systems. It presents methodological approaches for modelling of system components, including both classical and non-

  15. Comparisons of treatment means when factors do not interact in two-factorial studies

    KAUST Repository

    Wei, Jiawei; Carroll, Raymond J.; Harden, Kathryn K.; Wu, Guoyao

    2011-01-01

    Scientists in the fields of nutrition and other biological sciences often design factorial studies to test the hypotheses of interest and importance. In the case of two-factorial studies, it is widely recognized that the analysis of factor effects is generally based on treatment means when the interaction of the factors is statistically significant, and involves multiple comparisons of treatment means. However, when the two factors do not interact, a common understanding among biologists is that comparisons among treatment means cannot or should not be made. Here, we bring this misconception into the attention of researchers. Additionally, we indicate what kind of comparisons among the treatment means can be performed when there is a nonsignificant interaction among two factors. Such information should be useful in analyzing the experimental data and drawing meaningful conclusions.

  16. Comparisons of treatment means when factors do not interact in two-factorial studies

    KAUST Repository

    Wei, Jiawei

    2011-05-06

    Scientists in the fields of nutrition and other biological sciences often design factorial studies to test the hypotheses of interest and importance. In the case of two-factorial studies, it is widely recognized that the analysis of factor effects is generally based on treatment means when the interaction of the factors is statistically significant, and involves multiple comparisons of treatment means. However, when the two factors do not interact, a common understanding among biologists is that comparisons among treatment means cannot or should not be made. Here, we bring this misconception into the attention of researchers. Additionally, we indicate what kind of comparisons among the treatment means can be performed when there is a nonsignificant interaction among two factors. Such information should be useful in analyzing the experimental data and drawing meaningful conclusions.

  17. Parametric study of a target factory for laser fusion

    International Nuclear Information System (INIS)

    Sherohman, J.W.; Meier, W.R.

    1980-01-01

    An analysis of a target factory leading to the derivation of production rate equations has provided the basis for a parametric study. Rate equations describing the production of laser fusion targets have been developed for the purpose of identifying key parameters, attractive production techniques and cost scaling relationships for a commercial target factory

  18. Commissioning and Acceptance Testing of the existing linear accelerator upgraded to volumetric modulated arc therapy

    Science.gov (United States)

    Varadharajan, Ekambaram; Ramasubramanian, Velayudham

    2013-01-01

    Aim The RapidArc commissioning and Acceptance Testing program will test and ensure accuracy in DMLC position, precise dose-rate control during gantry rotation and accurate control of gantry speed. Background Recently, we have upgraded our linear accelerator capable of performing IMRT which was functional from 2007 with image guided RapidArc facility. The installation of VMAT in the existing linear accelerator is a tedious process which requires many quality assurance procedures before the proper commissioning of the facility and these procedures are discussed in this study. Materials and methods Output of the machine at different dose rates was measured to verify its consistency at different dose rates. Monitor and chamber linearity at different dose rates were checked. DMLC QA comprising of MLC transmission factor measurement and dosimetric leaf gap measurements were performed using 0.13 cm3 and 0.65 cm3 Farmer type ionization chamber, dose 1 dosimeter, and IAEA 30 cm × 30 cm × 30 cm water phantom. Picket fence test, garden fence test, tests to check leaf positioning accuracy due to carriage movement, calibration of the leaves, leaf speed stability effects due to the acceleration and deceleration of leaves, accuracy and calibration of leaves in producing complex fields, effects of interleaf friction, etc. were verified using EDR2 therapy films, Vidar scanner, Omnipro accept software, amorphous silicon based electronic portal imaging device and EPIQA software.1–8 Results All the DMLC related quality assurance tests were performed and evaluated by film dosimetry, portal dosimetry and EPIQA.7 Conclusion Results confirmed that the linear accelerator is capable of performing accurate VMAT. PMID:24416566

  19. Commissioning and Acceptance Testing of the existing linear accelerator upgraded to volumetric modulated arc therapy.

    Science.gov (United States)

    Varadharajan, Ekambaram; Ramasubramanian, Velayudham

    2013-01-01

    The RapidArc commissioning and Acceptance Testing program will test and ensure accuracy in DMLC position, precise dose-rate control during gantry rotation and accurate control of gantry speed. Recently, we have upgraded our linear accelerator capable of performing IMRT which was functional from 2007 with image guided RapidArc facility. The installation of VMAT in the existing linear accelerator is a tedious process which requires many quality assurance procedures before the proper commissioning of the facility and these procedures are discussed in this study. Output of the machine at different dose rates was measured to verify its consistency at different dose rates. Monitor and chamber linearity at different dose rates were checked. DMLC QA comprising of MLC transmission factor measurement and dosimetric leaf gap measurements were performed using 0.13 cm(3) and 0.65 cm(3) Farmer type ionization chamber, dose 1 dosimeter, and IAEA 30 cm × 30 cm × 30 cm water phantom. Picket fence test, garden fence test, tests to check leaf positioning accuracy due to carriage movement, calibration of the leaves, leaf speed stability effects due to the acceleration and deceleration of leaves, accuracy and calibration of leaves in producing complex fields, effects of interleaf friction, etc. were verified using EDR2 therapy films, Vidar scanner, Omnipro accept software, amorphous silicon based electronic portal imaging device and EPIQA software.(1-8.) All the DMLC related quality assurance tests were performed and evaluated by film dosimetry, portal dosimetry and EPIQA.(7.) Results confirmed that the linear accelerator is capable of performing accurate VMAT.

  20. B factory RF system design issues

    International Nuclear Information System (INIS)

    Zisman, M.S.

    1992-01-01

    We discuss the issues of relevance to the design of a B factory RF system. First, the general parameter regime is outlined, and the reasons behind certain commonly made choices are indicated. This regime involves high beam currents, and many relatively short bunches. Next, the physics difficulties associated with coupled-bunch instabilities are described briefly. We then describe in general terms the alternative approaches taken by various B factory designers, the motivation for these choices, and the technical issues raised by them. Technical solutions have been proposed for both the room-temperature and the superconducting RF scenarios, and considerable R ampersand D is being carried out worldwide to confirm and optimize these solutions