WorldWideScience

Sample records for facility permit improvements-2007

  1. Hanford Facility RCRA permit handbook

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Purpose of this Hanford Facility (HF) RCRA Permit Handbook is to provide, in one document, information to be used for clarification of permit conditions and guidance for implementing the HF RCRA Permit.

  2. Hanford facility dangerous waste permit application

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-09-18

    This document, Set 2, the Hanford Facility Dangerous Waste Part B Permit Application, consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 CFR 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of WAC 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. This permit application contains umbrella- type'' documentation with overall application to the Hanford Facility. This documentation is broad in nature and applies to all TSD units that have final status under the Hanford Facility Permit.

  3. Permitting of Wind Energy Facilities: A Handbook

    Energy Technology Data Exchange (ETDEWEB)

    NWCC Siting Work Group

    2002-08-01

    This handbook has been written for individuals and groups involved in evaluating wind projects: decision-makers and agency staff at all levels of government, wind developers, interested parties and the public. Its purpose is to help stakeholders make permitting wind facility decisions in a manner which assures necessary environmental protection and responds to public needs.

  4. Storm Water General Permit 1 for Industrial Facilities

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — General permit #1 for storm water discharges associated with industrial facilities in Iowa for the National Pollutant Discharge Elimination System (NPDES) program.

  5. Ships Docked at Title V Permitted Facilities

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  6. Hanford Facility dangerous waste permit application, liquid effluent retention facility and 200 area effluent treatment facility

    Energy Technology Data Exchange (ETDEWEB)

    Coenenberg, J.G.

    1997-08-15

    The Hanford Facility Dangerous Waste Permit Application is considered to 10 be a single application organized into a General Information Portion (document 11 number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the 12 Unit-Specific Portion is limited to Part B permit application documentation 13 submitted for individual, `operating` treatment, storage, and/or disposal 14 units, such as the Liquid Effluent Retention Facility and 200 Area Effluent 15 Treatment Facility (this document, DOE/RL-97-03). 16 17 Both the General Information and Unit-Specific portions of the Hanford 18 Facility Dangerous Waste Permit Application address the content of the Part B 19 permit application guidance prepared by the Washington State Department of 20 Ecology (Ecology 1987 and 1996) and the U.S. Environmental Protection Agency 21 (40 Code of Federal Regulations 270), with additional information needs 22 defined by the Hazardous and Solid Waste Amendments and revisions of 23 Washington Administrative Code 173-303. For ease of reference, the Washington 24 State Department of Ecology alpha-numeric section identifiers from the permit 25 application guidance documentation (Ecology 1996) follow, in brackets, the 26 chapter headings and subheadings. A checklist indicating where information is 27 contained in the Liquid Effluent Retention Facility and 200 Area Effluent 28 Treatment Facility permit application documentation, in relation to the 29 Washington State Department of Ecology guidance, is located in the Contents 30 Section. 31 32 Documentation contained in the General Information Portion is broader in 33 nature and could be used by multiple treatment, storage, and/or disposal units 34 (e.g., the glossary provided in the General Information Portion). Wherever 35 appropriate, the Liquid Effluent Retention Facility and 200 Area Effluent 36 Treatment Facility permit application documentation makes cross-reference to 37 the General Information Portion, rather than duplicating

  7. Guide to Permitting Hydrogen Motor Fuel Dispensing Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Rivkin, Carl [National Renewable Energy Lab. (NREL), Golden, CO (United States); Buttner, William [National Renewable Energy Lab. (NREL), Golden, CO (United States); Burgess, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-03-28

    The purpose of this guide is to assist project developers, permitting officials, code enforcement officials, and other parties involved in developing permit applications and approving the implementation of hydrogen motor fuel dispensing facilities. The guide facilitates the identification of the elements to be addressed in the permitting of a project as it progresses through the approval process; the specific requirements associated with those elements; and the applicable (or potentially applicable) codes and standards by which to determine whether the specific requirements have been met. The guide attempts to identify all applicable codes and standards relevant to the permitting requirements.

  8. Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    The 200 Area Effluent Treatment Facility Dangerous Waste Permit Application documentation consists of both Part A and a Part B permit application documentation. An explanation of the Part A revisions associated with this treatment and storage unit, including the current revision, is provided at the beginning of the Part A section. Once the initial Hanford Facility Dangerous Waste Permit is issued, the following process will be used. As final, certified treatment, storage, and/or disposal unit-specific documents are developed, and completeness notifications are made by the US Environmental Protection Agency and the Washington State Department of Ecology, additional unit-specific permit conditions will be incorporated into the Hanford Facility Dangerous Waste Permit through the permit modification process. All treatment, storage, and/or disposal units that are included in the Hanford Facility Dangerous Waste Permit Application will operate under interim status until final status conditions for these units are incorporated into the Hanford Facility Dangerous Waste Permit. The Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility contains information current as of May 1, 1993.

  9. Hanford facility dangerous waste permit application, PUREX storage tunnels

    Energy Technology Data Exchange (ETDEWEB)

    Haas, C. R.

    1997-09-08

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, `operating` treatment, storage, and/or disposal units, such as the PUREX Storage Tunnels (this document, DOE/RL-90-24).

  10. Hanford facility dangerous waste permit application, general information portion

    Energy Technology Data Exchange (ETDEWEB)

    Price, S.M., Westinghouse Hanford

    1996-07-29

    The `Hanford Facility Dangerous Waste Permit Application` is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit- Specific Portion. The scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Documentation included in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units. A checklist indicating where information is contained in the General Information Portion, in relation to the Washington State Department of Ecology guidance documentation, is located in the Contents Section. The intent of the General Information Portion is: (1) to provide an overview of the Hanford Facility; and (2) to assist in streamlining efforts associated with treatment, storage, and/or disposal unit-specific Part B permit application, preclosure work plan, closure work plan, closure plan, closure/postclosure plan, or postclosure permit application documentation development, and the `Hanford Facility Resource Conservation and Recovery Act Permit` modification process. Revision 2 of the General Information Portion of the `Hanford Facility Dangerous Waste Permit Application` contains information current as of May 1, 1996. This document is a complete submittal and supersedes Revision 1.

  11. Potable Water Treatment Facility General Permit (PWTF GP) ...

    Science.gov (United States)

    2017-04-10

    The Final PWTF GP establishes permit eligibility conditions, Notice of Intent (NOI) requirements, effluent limitations, standards, prohibitions, and best management practices for facilities that discharge to waters in the Commonwealth of Massachusetts (including both Commonwealth and Indian country lands) and the State of New Hampshire.

  12. Hanford facility dangerous waste permit application, general information portion

    Energy Technology Data Exchange (ETDEWEB)

    Hays, C.B.

    1998-05-19

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needed by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in this report).

  13. Hanford facility dangerous waste permit application, PUREX storage tunnels

    Energy Technology Data Exchange (ETDEWEB)

    Price, S.M.

    1997-09-08

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating treatment, storage, and/or disposal units, such as the PUREX Storage Tunnels (this document, DOE/RL-90-24). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the US Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needs defined by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. A checklist indicating where information is contained in the PUREX Storage Tunnels permit application documentation, in relation to the Washington State Department of Ecology guidance, is located in the Contents Section. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the PUREX Storage Tunnels permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this PUREX Storage Tunnels permit application documentation is current as of April 1997.

  14. Hanford Facility dangerous waste permit application, general information. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The current Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, number DOE/RL-91-28) and a treatment, storage, and/or disposal Unit-Specific Portion, which includes documentation for individual TSD units (e.g., document numbers DOE/RL-89-03 and DOE/RL-90-01). Both portions consist of a Part A division and a Part B division. The Part B division consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. Documentation contained in the General Information Portion (i.e., this document, number DOE/RL-91-28) is broader in nature and applies to all treatment, storage, and/or disposal units for which final status is sought. Because of its broad nature, the Part A division of the General Information Portion references the Hanford Facility Dangerous Waste Part A Permit Application (document number DOE/RL-88-21), a compilation of all Part A documentation for the Hanford Facility.

  15. Solid Waste Management Facilities with Permits by the Iowa DNR

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — All types of facilities that handle solid waste, including: sanitary landfills, appliance demanufacturing facilities, transfer stations, land application sites,...

  16. Air emission points for facilities in Iowa with operating permits for Title V of the Federal Clean Air Act_considered MAJOR permits

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — Air emission points for facilities in Iowa with operating permits for Title V of the Federal Clean Air Act, considered "major" permits. Also includes emission points...

  17. 76 FR 61735 - Incidental Take Permit; Auwahi Wind Energy Generation Facility, Maui, HI; Draft Habitat...

    Science.gov (United States)

    2011-10-05

    ... Fish and Wildlife Service Incidental Take Permit; Auwahi Wind Energy Generation Facility, Maui, HI..., Interior. ACTION: Notice of availability; receipt of permit application. SUMMARY: Auwahi Wind Energy LLC... Hawaiian goose occurs in the vicinity of the proposed wind energy facility and may collide with...

  18. Recycled Water Reuse Permit Renewal Application for the Central Facilities Area Sewage Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, Mike [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    This renewal application for a Recycled Water Reuse Permit is being submitted in accordance with the Idaho Administrative Procedures Act 58.01.17 “Recycled Water Rules” and the Municipal Wastewater Reuse Permit LA-000141-03 for continuing the operation of the Central Facilities Area Sewage Treatment Plant located at the Idaho National Laboratory. The permit expires March 16, 2015. The permit requires a renewal application to be submitted six months prior to the expiration date of the existing permit. For the Central Facilities Area Sewage Treatment Plant, the renewal application must be submitted by September 16, 2014. The information in this application is consistent with the Idaho Department of Environmental Quality’s Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater and discussions with Idaho Department of Environmental Quality personnel.

  19. RCRA Permit for a Hazardous Waste Management Facility, Permit Number NEV HW0101, Annual Summary/Waste Minimization Report

    Energy Technology Data Exchange (ETDEWEB)

    Arnold, Patrick [NSTec

    2014-02-14

    This report summarizes the EPA identification number of each generator from which the Permittee received a waste stream, a description and quantity of each waste stream in tons and cubic feet received at the facility, the method of treatment, storage, and/or disposal for each waste stream, a description of the waste minimization efforts undertaken, a description of the changes in volume and toxicity of waste actually received, any unusual occurrences, and the results of tank integrity assessments. This Annual Summary/Waste Minimization Report is prepared in accordance with Section 2.13.3 of Permit Number NEV HW0101.

  20. Hanford facility dangerous waste permit application, low-level burial grounds

    Energy Technology Data Exchange (ETDEWEB)

    Engelmann, R.H.

    1997-08-12

    The Hanford Facility Dangerous Plaste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, `operating` treatment, storage, and/or disposal units, such as the Low-Level Burial Grounds (this document, DOE/RL-88-20).

  1. Hanford facility dangerous waste permit application, general information portion. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Sonnichsen, J.C.

    1997-08-21

    For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy`s contractors are identified as ``co-operators`` and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ``operator`` elsewhere in the application is not meant to conflict with the contractors` designation as co-operators but rather is based on the contractors` contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit, which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which

  2. Hanford facility dangerous waste permit application, 325 hazardous waste treatment units. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    This report contains the Hanford Facility Dangerous Waste Permit Application for the 325 Hazardous Waste Treatment Units (325 HWTUs) which consist of the Shielded Analytical Laboratory, the 325 Building, and the 325 Collection/Loadout Station Tank. The 325 HWTUs receive, store, and treat dangerous waste generated by Hanford Facility programs. Routine dangerous and/or mixed waste treatment that will be conducted in the 325 HWTUs will include pH adjustment, ion exchange, carbon absorption, oxidation, reduction, waste concentration by evaporation, precipitation, filtration, solvent extraction, solids washing, phase separation, catalytic destruction, and solidification/stabilization.

  3. The Remote Handled Immobilization Low Activity Waste Disposal Facility Environmental Permits & Approval Plan

    Energy Technology Data Exchange (ETDEWEB)

    DEFFENBAUGH, M.L.

    2000-08-01

    The purpose of this document is to revise Document HNF-SD-ENV-EE-003, ''Permitting Plan for the Immobilized Low-Activity Waste Project, which was submitted on September 4, 1997. That plan accounted for the interim storage and disposal of Immobilized-Low Activity Waste at the existing Grout Treatment Facility Vaults (Project W-465) and within a newly constructed facility (Project W-520). Project W-520 was to have contained a combination of concrete vaults and trenches. This document supersedes that plan because of two subsequent items: (1) A disposal authorization that was received on October 25, 1999, in a U. S. Department of Energy-Headquarters, memorandum, ''Disposal Authorization Statement for the Department of Energy Hanford site Low-Level Waste Disposal facilities'' and (2) ''Breakthrough Initiative Immobilized Low-Activity Waste (ILAW) Disposal Alternative,'' August 1999, from Lucas Incorporated, Richland, Washington. The direction within the U. S. Department of Energy-Headquarters memorandum was given as follows: ''The DOE Radioactive Waste Management Order requires that a Disposal authorization statement be obtained prior to construction of new low-level waste disposal facility. Field elements with the existing low-level waste disposal facilities shall obtain a disposal authorization statement in accordance with the schedule in the complex-wide Low-Level Waste Management Program Plan. The disposal authorization statement shall be issued based on a review of the facility's performance assessment and composite analysis or appropriate CERCLA documentation. The disposal authorization shall specify the limits and conditions on construction, design, operations, and closure of the low-level waste facility based on these reviews. A disposal authorization statement is a part of the required radioactive waste management basis for a disposal facility. Failure to obtain a disposal authorization statement

  4. RCRA Permit for a Hazardous Waste Management Facility Permit Number NEV HW0101 Annual Summary/Waste Minimization Report - Calendar Year 2014

    Energy Technology Data Exchange (ETDEWEB)

    Arnold, Patrick [NSTec

    2015-02-17

    This report summarizes the EPA identification number of each generator from which the Permittee received a waste stream, a description and quantity of each waste stream in tons and cubic feet received at the facility, the method of treatment, storage, and/or disposal for each waste stream, a description of the waste minimization efforts undertaken, a description of the changes in volume and toxicity of waste actually received, any unusual occurrences, and the results of tank integrity assessments. This Annual Summary/Waste Minimization Report is prepared in accordance with Section 2.13.3 of Permit Number NEV HW0101.

  5. RCRA Permit for a Hazardous Waste Management Facility Permit Number NEV HW0101 Annual Summary/Waste Minimization Report Calendar Year 2011

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2012-02-16

    This report summarizes the U.S. Environmental Protection Agency (EPA) identification number of each generator from which the Permittee received a waste stream; a description and quantity of each waste stream in tons and cubic feet received at the facility; the method of treatment, storage, and/or disposal for each waste stream; a description of the waste minimization efforts undertaken; a description of the changes in volume and toxicity of waste actually received; any unusual occurrences; and the results of tank integrity assessments. This Annual Summary/Waste Minimization Report is prepared in accordance with Section 2.13.3 of Permit Number NEV HW0101.

  6. RCRA Permit for a Hazardous Waste Management Facility Permit Number NEV HW0101 Annual Summary/Waste Minimization Report Calendar Year 2012, Nevada National Security Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Arnold, P. M.

    2013-02-21

    This report summarizes the U.S. Environmental Protection Agency (EPA) identification number of each generator from which the Permittee received a waste stream, a description and quantity of each waste stream in tons and cubic feet received at the facility, the method of treatment, storage, and/or disposal for each waste stream, a description of the waste minimization efforts undertaken, a description of the changes in volume and toxicity of waste actually received, any unusual occurrences, and the results of tank integrity assessments. This Annual Summary/Waste Minimization Report is prepared in accordance with Section 2.13.3 of Permit Number NEV HW0101, issued 10/17/10.

  7. Report for the HWMA/RCRA Post Closure Permit for the INTEC Waste Calcining Facility at the INL Site

    Energy Technology Data Exchange (ETDEWEB)

    Idaho Cleanup Project

    2006-06-01

    The Waste Calcining Facility (WCF) is located at the Idaho Nuclear Technology and Engineering Center. In 1998, the WCF was closed under an approved Hazardous Waste Management Act/Resource Conservation and Recovery Act (HWMA/RCRA) Closure Plan. Vessels and spaces were grouted and then covered with a concrete cap. The Idaho Department of Environmental Quality issued a final HWMA/RCRA post-closure permit on September 15, 2003, with an effective date of October 16, 2003. This permit sets forth procedural requirements for groundwater characterization and monitoring, maintenance, and inspections of the WCF to ensure continued protection of human health and the environment. The post-closure permit also includes semiannual reporting requirements under Permit Conditions III.H. and I.U. These reporting requirements have been combined into this single semiannual report.

  8. Hazardous Material Storage Facilities and Sites - WASTE_SOLID_ACTIVE_PERMITTED_IDEM_IN: Active Permitted Solid Waste Sites in Indiana (Indiana Department of Environmental Management, Point Shapefile)

    Data.gov (United States)

    NSGIC GIS Inventory (aka Ramona) — WASTE_SOLID_ACTIVE_PERMITTED_IDEM_IN is a point shapefile that contains active permitted solid waste site locations in Indiana, provided by personnel of Indiana...

  9. State waste discharge permit application for the 200 Area Effluent Treatment Facility and the State-Approved Land Disposal Site

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    Application is being made for a permit pursuant to Chapter 173--216 of the Washington Administrative Code (WAC), to discharge treated waste water and cooling tower blowdown from the 200 Area Effluent Treatment Facility (ETF) to land at the State-Approved Land Disposal Site (SALDS). The ETF is located in the 200 East Area and the SALDS is located north of the 200 West Area. The ETF is an industrial waste water treatment plant that will initially receive waste water from the following two sources, both located in the 200 Area on the Hanford Site: (1) the Liquid Effluent Retention Facility (LERF) and (2) the 242-A Evaporator. The waste water discharged from these two facilities is process condensate (PC), a by-product of the concentration of waste from DSTs that is performed in the 242-A Evaporator. Because the ETF is designed as a flexible treatment system, other aqueous waste streams generated at the Hanford Site may be considered for treatment at the ETF. The origin of the waste currently contained in the DSTs is explained in Section 2.0. An overview of the concentration of these waste in the 242-A Evaporator is provided in Section 3.0. Section 4.0 describes the LERF, a storage facility for process condensate. Attachment A responds to Section B of the permit application and provides an overview of the processes that generated the wastes, storage of the wastes in double-shell tanks (DST), preliminary treatment in the 242-A Evaporator, and storage at the LERF. Attachment B addresses waste water treatment at the ETF (under construction) and the addition of cooling tower blowdown to the treated waste water prior to disposal at SALDS. Attachment C describes treated waste water disposal at the proposed SALDS.

  10. PSD Applicability for a PSD-Avoidance Permit Action for Intermet Corporation's Archer Creek Facility

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  11. Deficient Permit Notification Notice For Lake County Waste to Energy Facility

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  12. Hanford facility dangerous waste Part A, Form 3 and Part B permit application documentation, Central Waste Complex (WA7890008967)(TSD: TS-2-4)

    Energy Technology Data Exchange (ETDEWEB)

    Saueressig, D.G.

    1998-05-20

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating, treatment, storage, and/or disposal units, such as the Central Waste Complex (this document, DOE/RL-91-17). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needed by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. A checklist indicating where information is contained in the Central Waste Complex permit application documentation, in relation to the Washington State Department of Ecology guidance, is located in the Contents section. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the Central Waste Complex permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this Central Waste Complex permit application documentation is current as of May 1998.

  13. Fall 2010 Semiannual (III.H. and I.U.) Report for the HWMA/RCRA Post Closure Permit for the INTEC Waste Calcining Facility and the CPP 601/627/640 Facility at the INL Site

    Energy Technology Data Exchange (ETDEWEB)

    Boehmer, Ann

    2010-11-01

    The Waste Calcining Facility is located at the Idaho Nuclear Technology and Engineering Center. In 1999, the Waste Calcining Facility was closed under an approved Hazardous Waste Management Act/Resource Conservation and Recovery Act (HWMA/RCRA) Closure Plan. Vessels and spaces were grouted and then covered with a concrete cap. The Idaho Department of Environmental Quality issued a final HWMA/RCRA post-closure permit on September 15, 2003, with an effective date of October 16, 2003. This permit sets forth procedural requirements for groundwater characterization and monitoring, maintenance, and inspections of the Waste Calcining Facility to ensure continued protection of human health and the environment. The post closure permit also includes semiannual reporting requirements under Permit Conditions III.H. and I.U. These reporting requirements have been combined into this single semiannual report, as agreed between the Idaho Cleanup Project and Idaho Department of Environmental Quality. The Permit Condition III.H. portion of this report includes a description and the results of field methods associated with groundwater monitoring of the Waste Calcining Facility. Analytical results from groundwater sampling, results of inspections and maintenance of monitoring wells in the Waste Calcining Facility groundwater monitoring network, and results of inspections of the concrete cap are summarized. The Permit Condition I.U. portion of this report includes noncompliances not otherwise required to be reported under Permit Condition I.R. (advance notice of planned changes to facility activity which may result in a noncompliance) or Permit Condition I.T. (reporting of noncompliances which may endanger human health or the environment). This report also provides groundwater sampling results for wells that were installed and monitored as part of the Phase 1 post-closure period of the landfill closure components in accordance with HWMA/RCRA Landfill Closure Plan for the CPP-601 Deep

  14. 77 FR 67055 - Application for a Presidential Permit To Operate and Maintain Pipeline Facilities on the Border...

    Science.gov (United States)

    2012-11-08

    ... government of the Emirate of Abu Dhabi, United Arab Emirates. Polysar received a Presidential Permit in 1986....gov/e/enr/c52945.htm . FOR FURTHER INFORMATION CONTACT: Office of Energy Diplomacy, Energy...

  15. 78 FR 144 - Application for a Presidential Permit To Operate and Maintain Pipeline Facilities on the Border...

    Science.gov (United States)

    2013-01-02

    ... 800,000 bpd of heavy crude. FOR FURTHER INFORMATION CONTACT: Office of Energy Diplomacy, Energy... States and Canada; Enbridge Energy, LP AGENCY: Department of State. ACTION: Notice of Receipt of Enbridge Energy, Limited Partnership Application for a Presidential Permit to Operate and Maintain...

  16. 78 FR 727 - Public Notice of Proposed Reissuance of the NPDES General Permits for Facilities/Operations That...

    Science.gov (United States)

    2013-01-04

    .... Minor editing was done throughout the permits and fact sheets to correct typographic errors, update the...; (2) In Table 12 several antiquated analytical methods were removed from the list of acceptable analytical methods to be used in the analysis of sewage sludge. These methods may still be used...

  17. 76 FR 65723 - Proposed Reissuance of the NPDES General Permit for Facilities Related to Oil and Gas Extraction...

    Science.gov (United States)

    2011-10-24

    ... entrainment caused by cooling water intake structures. EPA also proposes to require produced water effluent... the data with respect to further action in order to minimize potential adverse impacts caused by... Gulf of Mexico, or any potential gas spill is not covered by this general permit. Endangered...

  18. 77 FR 4813 - Proposed Reissuance of the NPDES General Permits for Oil and Gas Exploration Facilities on the...

    Science.gov (United States)

    2012-01-31

    ... at the public hearing; (6) Hearing statements may be provided orally or in written format. Commenters... proposed rule'' for which the agency ``is required by section 553 of the Administrative Procedure Act (APA... permits, not rulemakings, under the APA and thus not subject to APA rulemaking requirements or the FRA...

  19. Prevention of significant deterioration permit application for the Fueled Clad Fabrication System, the Radioisotope Power Systems Facility, and the Fuel Assembly Area

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    This New Source Review'' has been submitted by the US Department of Energy-Richland Operations Office (PO Box 550, Richland, Washington 99352), pursuant to WAC 173-403-050 and in compliance with the Department of Ecology Guide to Processing A Prevention Of Significant Deterioration (PSD) Permit'' for three new sources of radionuclide emissions at the Hanford Site in Washington State. The three new sources, the Fueled Clad Fabrication System (FCFS), the Radioisotope Power Systems Facility (RPSF), and the Fuel Assembly Area (FAA), will be located in one facility, the Fuels and Materials Examination Facility (FMEF) of the 400 Area. The FMEF was originally designed to provide for post-irradiation examination and fabrication of breeder reactor fuels. These FMEF missions were cancelled before the introduction of any fuel materials or any irradiated material. The current plans are to use the facility to fabricate power supplies for use in space applications and to produce Fast Flux Test Facility (FFTF) fuel and target assemblies. The FCFS and the RPSF will produce materials and assemblies for application in space. The FAA project will produce FFTF fuel and target assemblies. The FCFS and the RPSF will share the same building, stack, and, in certain cases, the same floor space. Given this relationship, these systems will be dealt with separately to the extent possible. The FAA is a comparatively independent operation though it will share the FMEF complex.

  20. 77 FR 8855 - Final Reissuance of the NPDES General Permit for Facilities Related to Oil and Gas Extraction in...

    Science.gov (United States)

    2012-02-15

    ... exploration, development, and production facilities located in and discharging to the territorial seas off... the Territorial Seas of Texas AGENCY: Environmental Protection Agency. ACTION: Notice of Final NPDES... the Territorial Seas of Texas (No. TXG260000) for discharges from existing and new dischargers and...

  1. The Supreme Court Permits Religious Groups To Use Public School Facilities: Good News Club v. Milford Central School.

    Science.gov (United States)

    Russo, Charles J.; Mawdsley, Ralph D.

    2001-01-01

    Reviews basis for U.S. Supreme Court's June 2001 decision in "Good News Club v. Milford Central School," where Court held that the Christian religious club for students had the Constitutional right under the Free Speech Clause to use public school facilities after school hours. Explains impact of decision on board of education policy.…

  2. Spring 2009 Semiannual (III.H. and I.U.) Report for the HWMA/RCRA Post-Closure Permit for the INTEC Waste Calcining Facility at the INL Site

    Energy Technology Data Exchange (ETDEWEB)

    Boehmer, Ann M.

    2009-05-31

    The Waste Calcining Facility is located at the Idaho Nuclear Technology and Engineering Center. In 1999, the Waste Calcining Facility was closed under and approved Hazardous Waste Management Act/Resource Conservation and Recovery Act Closure plan. Vessels and spaces were grouted and then covered with a concrete cap. This permit sets forth procedural requirements for groundwater characterization and monitoring, maintenance, and inspections of the Waste Calcining Facility to ensure continued protection of human health and the environment.

  3. California Tribal Gasoline Permits

    Science.gov (United States)

    EPA is proposing a draft general permit under the Clean Air Act Federal Indian Country Minor NSR program for gasoline dispensing facilities, such as gas stations, located in Indian country within the geographical boundaries of California.

  4. Air Dispersion Modeling for the INL Application for a Synthetic Minor Sitewide Air Quality Permit to Construct with a Facility Emission Cap Component

    Energy Technology Data Exchange (ETDEWEB)

    Sondrup, Andrus Jeffrey [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-10-01

    The Department of Energy Idaho Operations Office (DOE-ID) is applying for a synthetic minor, Sitewide, air quality permit to construct (PTC) with a facility emission cap (FEC) component from the Idaho Department of Environmental Quality (DEQ) for Idaho National Laboratory (INL) to limit its potential to emit to less than major facility limits for criteria air pollutants (CAPs) and hazardous air pollutants (HAPs) regulated under the Clean Air Act. This document is supplied as an appendix to the application, Idaho National Laboratory Application for a Synthetic Minor Sitewide Air Quality Permit to Construct with a Facility Emissions Cap Component, hereafter referred to as “permit application” (DOE-ID 2015). Air dispersion modeling was performed as part of the permit application process to demonstrate pollutant emissions from the INL will not cause a violation of any ambient air quality standards. This report documents the modeling methodology and results for the air dispersion impact analysis. All CAPs regulated under Section 109 of the Clean Air Act were modeled with the exception of lead (Pb) and ozone, which are not required to be modeled by DEQ. Modeling was not performed for toxic air pollutants (TAPs) as uncontrolled emissions did not exceed screening emission levels for carcinogenic and non-carcinogenic TAPs. Modeling for CAPs was performed with the EPA approved AERMOD dispersion modeling system (Version 14134) (EPA 2004a) and five years (2000-2004) of meteorological data. The meteorological data set was produced with the companion AERMET model (Version 14134) (EPA 2004b) using surface data from the Idaho Falls airport, and upper-air data from Boise International Airport supplied by DEQ. Onsite meteorological data from the Grid 3 Mesonet tower located near the center of the INL (north of INTEC) and supplied by the local National Oceanic and Atmospheric Administration (NOAA) office was used for surface wind directions and wind speeds. Surface data (i

  5. Air Quality Facilities

    Data.gov (United States)

    Iowa State University GIS Support and Research FacilityFacilities with operating permits for Title V of the Federal Clean Air Act, as well as facilities required to submit an air emissions inventory, and other facilities...

  6. Rosebud Casino and Hotel NPDES Proposed Permit

    Science.gov (United States)

    Indian Country, Minor Permit, proposed permit SD-0034584, Rosebud Casino and Hotel, South Dakota, is authorized to discharge from its wastewater treatment facility in Todd County, South Dakota to an unnamed drainageway(s) tributary to Rock Creek.

  7. Dakota Magic Casino NPDES Permit

    Science.gov (United States)

    Under NPDES permit ND-0030813, the Dakota Nation Gaming Enterprise is authorized to discharge from the wastewater treatment facility in Richland County, North Dakota, to a roadside ditch flowing to an unnamed tributary to the Bois de Sioux.

  8. Wind Energy: Offshore Permitting

    Science.gov (United States)

    2008-05-01

    Technological advancements and tax incentives have driven a global expansion in the development of renewable energy resources. Wind energy , in...particular, is now often cited as the fastest growing commercial energy source in the world. Currently, all U.S. wind energy facilities are based on land...authority to permit and regulate offshore wind energy development within the zones of the oceans under its jurisdiction. The federal government and coastal

  9. EPA Region 2 Discharge Pipes for Facilites with NPDES Permits from the Permit Compliance GIS Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Permit and Compliance System (PCS) contains data on the National Pollution Discharge Elimination Systems (NPDES) permit-holding facilities. This includes...

  10. 36 CFR 13.188 - Permit terms.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Permit terms. 13.188 Section....188 Permit terms. The Superintendent shall allow for use and occupancy of a temporary facility only to... Superintendent may also establish permit terms that: (a) Limit use to a specified period, not to exceed...

  11. Ci PERMIT

    CERN Multimedia

    Relations with the Host States Service

    1999-01-01

    The Swiss Permanent Mission to the International Organisations at Geneva recalls that only the spouses and children of members of personnel resident in Switzerland and in possession of a legitimation card of types 'B', 'C', 'D' or 'E' issued by the Swiss Federal Department of Foreign Affairs are entitled to benefit from a Ci Permit.The 'demande d'attestation de permis Ci' (request for a Ci permit attestation) can be sent to the Mission only through Personnel Division (Administrative Services, Office 33/1-025).Additional information on access by family members of CERN officials to the Swiss labour market are available to you on the Web site of the Relations with the Host States Service (cf. document entitled 'Employment in Switzerland for spouses and children of CERN officials' dated March 1996).Relations with the Host States Servicehttp://www.cern.ch/relations/Tel. 72848

  12. Annual Hanford Site Environmental Permitting Status Report

    Energy Technology Data Exchange (ETDEWEB)

    HOMAN, N.A.

    2000-10-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. This status report also addresses Permit Condition I.E.22, as interpreted in Section 12.1.25 of the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Rev. 4), that states this report will be prepared annually and a copy of this report will be placed in the Facility Operating Record, General Information file by October 1 of each year.

  13. Permitted Exceptions

    DEFF Research Database (Denmark)

    Wagner, Anne Margrethe

    This PhD thesis examines the phenomenon of temporary use in a contemporary Northern European planning context. The background for the study is the increasing interest in initiating temporary use projects within urban redevelopment by public authorities, such as municipalities, related sub......-term perspectives. This factor seems to hold some, if not conflicting, then at least challenging aspects. Current research is inadequate to disclose what actually happens when integrating temporary exceptions into urban transformation projects. I define, document and explore these attempts as permitted exceptions...

  14. Region 9 NPDES Facilities

    Data.gov (United States)

    U.S. Environmental Protection Agency — Point geospatial dataset representing locations of NPDES Facilities. NPDES (National Pollution Discharge Elimination System) is an EPA permit program that regulates...

  15. Wastewater Treatment Facilities

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — Individual permits for municipal, industrial, and semi-public wastewater treatment facilities in Iowa for the National Pollutant Discharge Elimination System (NPDES)...

  16. Permitted Exceptions

    DEFF Research Database (Denmark)

    Wagner, Anne Margrethe

    organisations and partnerships. In this context temporary uses are more than simple short-term appropriations of vacant areas; they become tools for various planning agendas—to establish new collaborative practices, transform spaces, test future facilities in ‘light versions’ and communicate with the public....... In this thesis I research the implementation of temporary urban spaces that are authorised, offi cially launched by public authorities, based on three case studies, two from Denmark and one from the Netherlands: a harbour transformation area in Køge, a vacant urban plot in Valby, Copenhagen and the industrial......This PhD thesis examines the phenomenon of temporary use in a contemporary Northern European planning context. The background for the study is the increasing interest in initiating temporary use projects within urban redevelopment by public authorities, such as mun icipalities, related sub...

  17. Storm Water General Permit 2 for Construction

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — General permit #2 for storm water discharges associated with industrial activity for Construction Activities in Iowa for the National Pollutant Discharge Elimination...

  18. Rosebud Casino and Hotel NPDES Permit

    Science.gov (United States)

    Under NPDES permit SD-0034584, Rosebud Casino and Hotel, South Dakota, is authorized to discharge from its wastewater treatment facility in Todd County, South Dakota to an unnamed drainageway(s) tributary to Rock Creek.

  19. Crow Nation Water Treatment Plant NPDES Permit

    Science.gov (United States)

    Under NPDES permit MT-0030538, the U.S. Bureau of Indian Affairs is authorized to discharge from the Crow Agency water treatment plants via the wastewater treatment facility located in Bighorn County, Montana to the Little Bighorn River.

  20. Permit Review - Florida Gas Transmission Company (FGT)

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Branch of Air Quality Permit Review for Florida Gas Transmission Company and their expansion of Compressor Station Number 10 in Wiggins, Mississippi. The facility is...

  1. Annual Hanford Site environmental permitting status report

    Energy Technology Data Exchange (ETDEWEB)

    Sonnichsen, J.C.

    1998-09-17

    The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, `best efforts` means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for

  2. Annual Hanford Site Environmental Permitting status report

    Energy Technology Data Exchange (ETDEWEB)

    SONNICHSEN, J.C.

    1999-10-18

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies.

  3. Facing Title V permit constraints

    Energy Technology Data Exchange (ETDEWEB)

    Patankar, U.M. [JACA Corp., Fort Washington, PA (United States)

    1995-06-01

    The new Title V operating permit requirement under state regulations pursuant to the 1990 Clean Air Act Amendments will cover every emission source at a facility. These rules will significantly affect an operation by setting minimum compliance requirements, mandating periodic compliance certification, prescribing complex monitoring, record keeping and reporting procedures and making state and EPA approval of routine operational changes necessary through a permit amendment. The main concern with Title V is its effect on the operational flexibility of a facility, and individual emission sources within that facility. Unless properly addressed in a permit document, the term operational flexibility, so freely used by regulators in the context of the Title V program, can turn into a misnomer and the ability to operate as before may be significantly compromised under Title V. True operational flexibility is essential for businesses to respond to real changes in the marketplace. In the age of automation, just-in-time inventories and increased competition, flexibility to operate can mean the difference between growth and stagnation.

  4. Region 9 NPDES Facilities 2012

    Data.gov (United States)

    U.S. Environmental Protection Agency — Point geospatial dataset representing locations of NPDES Facilities. NPDES (National Pollution Discharge Elimination System) is an EPA permit program that regulates...

  5. Region 9 NPDES 2011 Facilities

    Data.gov (United States)

    U.S. Environmental Protection Agency — Point geospatial dataset representing locations of NPDES Facilities. NPDES (National Pollution Discharge Elimination System) is an EPA permit program that regulates...

  6. Federal Fisheries Permit (FFP)/ Federal Processor Permit (FPP) Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Federal Fisheries Permit (FFP) is required for vessels of the United States which are used to fish for groundfish in the Gulf of Alaska or Bering Sea and...

  7. 40 CFR 270.65 - Research, development, and demonstration permits.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Research, development, and... Special Forms of Permits § 270.65 Research, development, and demonstration permits. (a) The Administrator may issue a research, development, and demonstration permit for any hazardous waste treatment facility...

  8. EPA Facility Registry Service (FRS): AIRS_AFS Sub Facilities

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Air Facility System (AFS) contains compliance and permit data for stationary sources regulated by EPA, state and local air pollution agencies. The sub facility...

  9. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Environmental report-construction permit, early site... Environmental Policy Act-Regulations Implementing Section 102(2) Environmental Reports-Production and Utilization Facilities § 51.50 Environmental report—construction permit, early site permit, or...

  10. Environmentally Regulated Facilities in Iowa

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — A unique record for each facility site with an environmental interest by DNR (such as permits). This brings together core environmental information in one place for...

  11. Permit.LOA table

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This table includes the effective dates by vessel and permit number for each issued letter of authorization (LOA) by the Permit Office (APSD)

  12. State Licenses & Permits

    Data.gov (United States)

    Small Business Administration — Starting a business? Confused about whether you need a business license or permit? Virtually every business needs some form of license or permit to operate legally....

  13. Liquid Effluent Retention Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Liquid Effluent Retention Facility (LERF) is located in the central part of the Hanford Site. LERF is permitted by the State of Washington and has three liquid...

  14. Hazardous Material Storage Facilities and Sites, DSHWPOPermittedUsedOilFacilities-Location in Utah of all Used Oil Facilities: Marketers, Porcessoors, Transfer, Transport and Off-specification Permitted by UDEQ Division of Hazardous Waste (DSHW) - Used Oil Section. Federal Fiscal Year 2006. Dataset Upda, Published in 2006, 1:100000 (1in=8333ft) scale, State of Utah Automated Geographic Reference Center.

    Data.gov (United States)

    NSGIC GIS Inventory (aka Ramona) — This Hazardous Material Storage Facilities and Sites dataset, published at 1:100000 (1in=8333ft) scale, was produced all or in part from Hardcopy Maps information...

  15. Standing Rock Rural Water System NPDES Permit

    Science.gov (United States)

    Under NPDES permit SD-0030996, the Standing Rock Rural Water System is authorized to discharge from its wastewater treatment facility in Corson County, South Dakota, to an unnamed tributary to Fisher Creek, a tributary to Oahe Reservoir on the Missouri R.

  16. CCS Project Permit Acquisition Protocols

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Si-Yong; Zaluski, Wade; Matthews, Vince; McPherson, Brian

    2013-06-30

    Geologic carbon storage projects require a vast range of permits prior to deployment. These include land-access permits, drilling permits, seismic survey permits, underground injection control permits, and any number of local and state permits, depending on the location of the project. For the “Characterization of Most Promising Sequestration Formations in the Rocky Mountain Region” (RMCCS) project in particular, critical permits included site access permits, seismic survey permits, and drilling permits for the characterization well. Permits for these and other activities were acquired either prior to or during the project.

  17. Storm Water General Permit 3 for Rock and Asphalt

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — General permit #3 for storm water discharges associated with industrial activity for Asphalt Plants, Concrete Batch Plants, Rock Crushing Plants and Construction...

  18. Cameron Trading Post; Proposed NPDES Permit NN0021610

    Science.gov (United States)

    EPA is proposing to issue NPDES permit (No. NN0021610) to Cameron Trading Post for the wastewater treatment facility located on private land in Cameron (Township 29N, Range 9E, Section 22), Coconino County, Arizona.

  19. Wesco Operating, Inc. – Maverick Springs NPDES Permit

    Science.gov (United States)

    Under NPDES permit WY-0000469, Wesco Operating, Inc. - Maverick Springs is authorized to discharge from its wastewater treatment facility located in Fremont County, Wyoming to a tributary to Five Mile Creek.

  20. Marathon Oil Company – Maverick Springs NPDES Permit

    Science.gov (United States)

    Under NPDES permit WY-0000779, the Marathon Oil Company – Maverick Springs is authorized to discharge from its wastewater treatment facility located in Fremont County, Wyoming to a tributary to Five Mile Creek.

  1. NPDES Water Permit Program in New England | US EPA

    Science.gov (United States)

    2017-04-10

    NPDES stands for National Pollutant Discharge Elimination System. Under the NPDES program, all municipal, industrial and commercial facilities that discharge wastewater directly from a point source (a discrete conveyance such as a pipe, ditch or channel) into a receiving waterbody (lake, river, ocean) are issued an NPDES permit. Facilities that discharge wastewater to a publicly owned treatment works (POTW), which in turn discharges into the receiving waterbody, are not subject to NPDES permits; rather they are controlled by the national pretreatment program.

  2. 40 CFR 264.344 - Hazardous waste incinerator permits.

    Science.gov (United States)

    2010-07-01

    ... WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Incinerators § 264.344 Hazardous waste incinerator permits. (a) The owner or operator of a... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Hazardous waste incinerator permits...

  3. BCDC Minor Permits

    Data.gov (United States)

    California Department of Resources — An administrative permit can be issued for an activity that qualifies as a minor repair or improvement in a relatively short period of time and without a public...

  4. Coal Mine Permit Boundaries

    Data.gov (United States)

    Earth Data Analysis Center, University of New Mexico — ESRI ArcView shapefile depicting New Mexico coal mines permitted under the Surface Mining Control and Reclamation Act of 1977 (SMCRA), by either the NM Mining these...

  5. BCDC Major Permits

    Data.gov (United States)

    California Department of Resources — Data depicts the majority of the major permits that BCDC has issued. Data has been created by a team of interns and staff and has been digitized using maps provided...

  6. Allegheny County Asbestos Permits

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Asbestos permit data issued by the County for commercial building demolitions and renovations as required by the EPA. This file is updated daily and can be...

  7. North Bay Aqueduct (Phase II Facilities), Solano County, California. Regulatory Permit Application Made by the California Department of Water Resources to the U.S. Army Corps of Engineers, Public Notice 12950-58.

    Science.gov (United States)

    1982-05-01

    4/ Suplemental Without Water With Supply Water 3/ Conservation Water 2/ Water Conservation Potential ConservaTion Requirement Solano Co 1990 75,500...conservation and to familiarize them with curriculum materials. o Tours of the water agency facilities should be offered to school children and should be part...programs and provide a consistent model for children to follow. G. Information on Federal and State Water Conservation Programs, Laws, and Sanctions 1

  8. Approaches to Streamline Air Permitting for Combined Heat and Power: Permits by Rule and General Permits

    Science.gov (United States)

    This factsheet provides information about permit by rule (PBR) and general permit (GP) processes, including the factors that contributed to their development and lessons learned from their implementation.

  9. 30 CFR 816.181 - Support facilities.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Support facilities. 816.181 Section 816.181... § 816.181 Support facilities. (a) Support facilities shall be operated in accordance with a permit... results. (b) In addition to the other provisions of this part, support facilities shall be located...

  10. 9 CFR 590.534 - Freezing facilities.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Freezing facilities. 590.534 Section..., and Facility Requirements § 590.534 Freezing facilities. (a) Freezing rooms, either on or off the... as set forth in § 590.536. Use of off-premise freezing facilities is permitted only when prior...

  11. 30 CFR 817.181 - Support facilities.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Support facilities. 817.181 Section 817.181... ACTIVITIES § 817.181 Support facilities. (a) Support facilities shall be operated in accordance with a permit.... (b) In addition to the other provisions of this part, support facilities shall be located, maintained...

  12. Permit application modifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils.

  13. Facilities | ECHO | US EPA

    Science.gov (United States)

    ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.

  14. 41 CFR 102-74.280 - Are privately owned vehicles converted for propane carburetion permitted in underground parking...

    Science.gov (United States)

    2010-07-01

    ... vehicles converted for propane carburetion permitted in underground parking facilities? 102-74.280 Section... underground parking facilities? Federal agencies must not permit privately owned vehicles converted for propane carburetion to enter underground parking facilities unless the owner provides to the...

  15. Pacific Islands Region Fishing Permits

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Sustainable Fisheries Division Permits Program issues around 300 permits annually for pelagic longline and troll & handline, bottomfish, crustacean (lobster...

  16. Vessel Permit System Data Set

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — GARFO issues federal fishing permits annually to owners of fishing vessels who fish in the Greater Atlantic region, as required by federal regulation. These permits...

  17. Regulatory and Permitting Issues

    Energy Technology Data Exchange (ETDEWEB)

    Larry Myer

    2005-12-01

    As part of the West Coast Regional Carbon Sequestration Partnership (WESTCARB), Terralog Technologies USA, Inc., reviewed current state and federal regulations related to carbon dioxide capture and storage within geologic formations and enhanced carbon uptake in terrestrial ecosystems. We have evaluated and summarized the current and possible future permitting requirements for the six states that comprise the West Coast Regional Partnership. Four options exist for CO{sub 2} injection into appropriate geologic formations, including storage in: (1) oil and gas reservoirs, (2) saline formations, (3) unmineable coal beds, and (4) salt caverns. Terrestrial CO{sub 2} sequestration involves improved carbon conservation management (e.g. reduction of deforestation), carbon substitution (e.g., substitution for fossil fuel-based products, energy conservation through urban forestry, biomass for energy generation), and improved carbon storage management (e.g., expanding the storage of carbon in forest ecosystems). The primary terrestrial options for the West Coast Region include: (1) reforestation of under-producing lands (including streamside forest restoration), (2) improved forest management, (3) forest protection and conservation, and (4) fuel treatments for the reduction of risk of uncharacteristically severe fires (potentially with associated biomass energy generation). The permits and/or contracts required for any land-use changes/disturbances and biomass energy generation that may occur as part of WESTCARB's activities have been summarized for each state.

  18. Should Advertising by Aesthetic Surgeons be Permitted?

    Science.gov (United States)

    Nagpal, Neeraj

    2017-01-01

    Cosmetic, aesthetic and cutaneous surgical procedures require qualified specialists trained in the various procedures and competent to handle complications. However, it also requires huge investments in terms of infrastructure, trained staff and equipment. To be viable advertising is essential to any establishment which provides cosmetic and aesthetic procedures. Business men with deep pockets establish beauty chains which also provide these services and advertise heavily to sway public opinion in their favour. However, these saloons and spas lack basic medical facilities in terms of staff or equipment to handle any complication or medical emergency. To have a level playing field ethical advertising should be permitted to qualified aesthetic surgeons as is permitted in the US and UK by their respective organisations. PMID:28529421

  19. 30 CFR 784.30 - Support facilities.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Support facilities. 784.30 Section 784.30... Support facilities. Each applicant for an underground coal mining and reclamation permit shall submit a description, plans, and drawings for each support facility to be constructed, used, or maintained within the...

  20. 30 CFR 780.38 - Support facilities.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Support facilities. 780.38 Section 780.38... Support facilities. Each applicant for a surface coal mining and reclamation permit shall submit a description, plans, and drawings for each support facility to be constructed, used, or maintained within the...

  1. Region 9 National Pollution Discharge Elimination System (NPDES) Facilities

    Data.gov (United States)

    U.S. Environmental Protection Agency — Point geospatial dataset representing locations of NPDES Facilities. NPDES (National Pollution Discharge Elimination System) is an EPA permit program that regulates...

  2. Avoiding Title V permitting pitfalls

    Energy Technology Data Exchange (ETDEWEB)

    Laswell, D.L.

    1993-04-01

    Title V of the 1990 Clean Air Act Amendments requires states to implement new air operating permit programs. States have a great deal of flexibility in developing their permit programs. Industry should work now to ensure that state programs contain the favorable aspects of the federal regulations and do not contain more stringent requirements that are not required under the Clean Air Act. This article outlines areas of the permit program that have the potential to handicap industry`s ability to expand.

  3. 41 CFR 102-74.70 - Are commercial vendors and nonprofit organizations required to operate vending facilities by...

    Science.gov (United States)

    2010-07-01

    ... and nonprofit organizations required to operate vending facilities by permit or contractual... Management Concession Services § 102-74.70 Are commercial vendors and nonprofit organizations required to operate vending facilities by permit or contractual arrangement? Commercial vendors and...

  4. 40 CFR 266.102 - Permit standards for burners.

    Science.gov (United States)

    2010-07-01

    ... (CONTINUED) STANDARDS FOR THE MANAGEMENT OF SPECIFIC HAZARDOUS WASTES AND SPECIFIC TYPES OF HAZARDOUS WASTE MANAGEMENT FACILITIES Hazardous Waste Burned in Boilers and Industrial Furnaces § 266.102 Permit standards... that the hazardous waste, other fuels, and industrial furnace feedstocks fired into the boiler or...

  5. Tradeable Emission Permits in Oligopoly

    NARCIS (Netherlands)

    Fershtman, C.; de Zeeuw, A.J.

    1996-01-01

    The paper considers an oligopolistic industry in which pollution is a by-product of production. Firms are assumed to have emission permits that restrict the amount that they pollute. These permits are assumed to be tradeable and the paper discusses a structure in which the same set of firms operates

  6. Facilities & Leadership

    Data.gov (United States)

    Department of Veterans Affairs — The facilities web service provides VA facility information. The VA facilities locator is a feature that is available across the enterprise, on any webpage, for the...

  7. State Waste Discharge Permit application: 400 Area Septic System

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affects groundwater or has the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 400 Area Septic System. The influent to the system is domestic waste water. Although the 400 Area Septic System is not a Public Owned Treatment Works, the Public Owned Treatment Works application is more applicable than the application for industrial waste water. Therefore, the State Waste Discharge Permit application for Public Owned Treatment Works Discharges to Land was used.

  8. 40 CFR 262.212 - Making the hazardous waste determination at an on-site interim status or permitted treatment...

    Science.gov (United States)

    2010-07-01

    ....212 Making the hazardous waste determination at an on-site interim status or permitted treatment... hazardous waste permit or interim status as soon as it arrives in the on-site treatment, storage or disposal... permitted treatment, storage or disposal facility. (e) If the unwanted material is a hazardous waste, the...

  9. sUAS Facility Map - Download dataset

    Data.gov (United States)

    Department of Transportation — sUAS Facility Maps (UASFM) that indicate “pre-approved fly altitudes.” Within each grid on the map, FAA would identify maximum altitudes at which flight is permitted...

  10. Biochemistry Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Biochemistry Facility provides expert services and consultation in biochemical enzyme assays and protein purification. The facility currently features 1) Liquid...

  11. 40 CFR 270.42 - Permit modification at the request of the permittee.

    Science.gov (United States)

    2010-07-01

    ... changes that keep the permit current with routine changes to the facility or its operation. These changes..., valves, pumps, conveyors, controls) 1 4. Changes in the frequency of or procedures for monitoring...

  12. Superfund and Toxic Release Inventory Sites - MO 2010 Permitted Hazardous Waste Sites - Areas(SHP)

    Data.gov (United States)

    NSGIC GIS Inventory (aka Ramona) — This is a polygon data set depicting locations of facilities' property boundaries. The data set contains sites permitted to treat, store or dispose of hazardous...

  13. 2008 Contruction General Permits & Multi-Sector General Permits

    Data.gov (United States)

    U.S. Environmental Protection Agency — View stormwater notices of intent (NOIs) for construction projects under EPA's 2008 Construction General Permit (CGP), for Low Erosivity Waivers (LEWs) submitted...

  14. Noncooperative models of permit markets

    Energy Technology Data Exchange (ETDEWEB)

    Godal, Odd

    2011-07-15

    The applicability of some popular and basic permit market theories has been questioned. Drawing on noncooperative equilibrium theory for pure exchange economies, this article adapts several well-established alternative models to permit exchange. Some qualitative properties of the associated equilibria are provided, including two games with equilibria that in a sense coincide. Nevertheless, as there exist quite a few models potentially applicable to emissions trading, with equilibria that range from autarky to Pareto optimality, it seems that economics lacks a broadly accepted basic theory for permit markets. (Author)

  15. 21 CFR 58.15 - Inspection of a testing facility.

    Science.gov (United States)

    2010-04-01

    ... assurance unit records of findings and problems, or to actions recommended and taken. (b) The Food and Drug... marketing permit if the testing facility refuses to permit inspection. The determination that a nonclinical laboratory study will not be considered in support of an application for a research or marketing permit...

  16. Permitting - the latest mining risk

    Energy Technology Data Exchange (ETDEWEB)

    Hume, W.M.; Munn, F.J. [Cardinal River Coals Ltd., Hinton, AB (Canada)

    1995-05-01

    The Cheviot approach to mine permitting and the status of the Cheviot permitting process are described. The mine is the first Canadian metallurgical mine built since the early 1970s and will replace the Luscar Mine. There have been significant changes in the technology of mining equipment and with the requirements for government regulatory approvals since 1980, when the last mines were built. A permit application must be technically complete and must be legally correct. A valid public involvement process must support an application. A permit application is now an entire process that leads to submission and review of a document. Cardinal River Coals is applying two principles in order to meet these objectives: to be technically advanced and show the ability to manage the environment; and to conduct a proactive and effective public involvement program.

  17. Permit trading and credit trading

    DEFF Research Database (Denmark)

    Boom, Jan-Tjeerd; R. Dijstra, Bouwe

    This paper compares emissions trading based on a cap on total emissions (permit trading) and on relative standards per unit of output (credit trading). Two types of market structure are considered: perfect competition and Cournot oligopoly. We find that output, abatement costs and the number...... of firms are higher under credit trading. Allowing trade between permit-trading and credit-trading sectors may increase in welfare. With perfect competition, permit trading always leads to higher welfare than credit trading. With imperfect competition, credit trading may outperform permit trading....... Environmental policy can lead to exit, but also to entry of firms. Entry and exit have a profound impact on the performance of the schemes, especially under imperfect competition. We find that it may be impossible to implement certain levels of total industry emissions. Under credit trading several levels...

  18. Factors Influencing Learner Permit Duration

    Directory of Open Access Journals (Sweden)

    Johnathon P. Ehsani

    2016-12-01

    Full Text Available An increasing number of countries are requiring an extended learner permit prior to independent driving. The question of when drivers begin the learner permit period, and how long they hold the permit before advancing to independent licensure has received little research attention. Licensure timing is likely to be related to “push” and “pull” factors which may encourage or inhibit the process. To examine this question, we recruited a sample of 90 novice drivers (49 females and 41 males, average age of 15.6 years soon after they obtained a learner permit and instrumented their vehicles to collect a range of driving data. Participants completed a series of surveys at recruitment related to factors that may influence licensure timing. Two distinct findings emerged from the time-to-event analysis that tested these push and pull factors in relation to licensure timing. The first can be conceptualized as teens’ motivation to drive (push, reflected in a younger age when obtaining a learner permit and extensive pre-permit driving experience. The second finding was teens’ perceptions of their parents’ knowledge of their activities (pull; a proxy for a parents’ attentiveness to their teens’ lives. Teens who reported higher levels of their parents’ knowledge of their activities took longer to advance to independent driving. These findings suggest time-to-licensure may be related to teens’ internal motivation to drive, and the ability of parents to facilitate or impede early licensure.

  19. 50 CFR 13.28 - Permit revocation.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 1 2010-10-01 2010-10-01 false Permit revocation. 13.28 Section 13.28... GENERAL PERMIT PROCEDURES Permit Administration § 13.28 Permit revocation. (a) Criteria for revocation. A... revocation. (1) When the issuing officer believes there are valid grounds for revoking a permit,...

  20. 9 CFR 104.2 - Permit authorized.

    Science.gov (United States)

    2010-01-01

    ... permits for importing biological products. They shall be: (1) U.S. Veterinary Biological Product Permit for Research and Evaluation; (2) U.S. Veterinary Biological Product Permit for Distribution and Sale; or (3) U.S. Veterinary Biological Product Permit for Transit Shipment Only. (b) A permit shall not be...

  1. PERMITTING LEADERSHIP IN THE UNITED STATES

    Energy Technology Data Exchange (ETDEWEB)

    Ken Nemeth

    2002-09-01

    In accordance with the Southern States Energy Board (SSEB) proposal, as incorporated into NETL/DE-FC26-97FT34199, the objective of this agreement is to streamline the environmental technology permitting process site-to-site, state-to-state, and industry-to-industry to achieve remediation and waste processing faster, better and cheaper. SSEB is working with member Governors, legislators and regulators to build consensus on streamlining the permitting process for new and innovative technologies for addressing the legacy of environmental problems from 50 years of weapons research, development and production. This report reviews mechanisms whereby industry consortiums and the Department of Energy (DOE) have been working with State regulators and other officials in technology deployment decisions within the DOE complex. The historic development of relationships with State regulators is reviewed and the current nature of the relationships examined. The report contains observations from internal DOE reviews as well as recommendations from the General Accounting Office (GAO) and other external organizations. The report discusses reorganization initiatives leading up to a DOE Top-to-Bottom review of the Environmental Management (EM) Program and highlights points of consideration for maintaining effective linkages with State regulators. It notes how the proposed changes will place new demands upon the National Energy Technology Laboratory (NETL) and how NETL can leverage its resources by refocusing existing EM efforts specifically to states that have DOE facilities within their borders (host-states). Finally, the report discusses how SSEB's Permitting Leadership in the United States (PLUS) program can provide the foundation for elements of NETL's technical assistance program that are delivered to regulators and other decision- makers in host-states. As a regional compact commission, SSEB provides important direct linkages to regulators and stakeholders who need

  2. Water Quality Trading Toolkit for Permit Writers

    Science.gov (United States)

    The Water Quality Trading Toolkit for Permit Writers is EPA’s first “how-to” manual on designing and implementing water quality trading programs. It helps NPDES permitting authorities incorporate trading provisions into permits.

  3. Fabrication Facilities

    Data.gov (United States)

    Federal Laboratory Consortium — The Fabrication Facilities are a direct result of years of testing support. Through years of experience, the three fabrication facilities (Fort Hood, Fort Lewis, and...

  4. Resource Conservation and Recovery Act, Part B Permit Application [for the Waste Isolation Pilot Plant (WIPP)]. Chapter D, Appendix D1 (conclusion): Volume 3, Revision 1.0

    Energy Technology Data Exchange (ETDEWEB)

    1992-06-01

    This report, Part B (Vol. 3) of the permit application for the WIPP facility, contains information related to the site characterization of the facility, including geology, design, rock salt evaluations, maps, drawings, and shaft excavations. (CBS)

  5. Facility Microgrids

    Energy Technology Data Exchange (ETDEWEB)

    Ye, Z.; Walling, R.; Miller, N.; Du, P.; Nelson, K.

    2005-05-01

    Microgrids are receiving a considerable interest from the power industry, partly because their business and technical structure shows promise as a means of taking full advantage of distributed generation. This report investigates three issues associated with facility microgrids: (1) Multiple-distributed generation facility microgrids' unintentional islanding protection, (2) Facility microgrids' response to bulk grid disturbances, and (3) Facility microgrids' intentional islanding.

  6. FIRE PERMIT NOW ON EDH!

    CERN Multimedia

    TIS General Safety Group or

    2001-01-01

    The electronic version of the Fire Permit form is now active. The aim of the Fire Permit procedure is to reduce the risk of fire or explosion. It is mandatory when performing 'hot work' (mainly activities which involve the use of naked flames or other heat sources - e.g. welding, brazing, cutting, grinding, etc.). Its use is explained in the CERN Fire Protection Code E. (Fire Protection) The new electronic form, which is substantially unchanged from the previous authorizing procedure, will be available on the Electronic Document Handling system (https://edh.cern.ch/) as of 1st September 2001. From this date use of the paper version should be discontinued.

  7. Case history review--demilitarization combustion permits.

    Science.gov (United States)

    Gaborek, B J

    2000-02-01

    In May 1993, Administrative Browner of the U.S. Environmental Protection Agency (USEPA) announced that an indirect exposure health risk assessment was required for all hazardous waste combustion facilities seeking a Resource Conservation and Recovery Act permit. These types of risk assessments evaluate the health and environmental effects from inhalation of emissions (direct exposure) and from contact with environmental media and consumption of food products impacted by the emissions (indirect exposure). Completion of an indirect exposure risk assessment is often complicated by the various methodologies available for generating results and by the requirements of the regulating community. To minimize this complexity and to maximize consistency between risk assessments, the USEPA developed a number of detailed guidance documents. Site-specific conditions and toxicological data gaps, however, continue to present challenges not addressed by these guidance documents. This paper presents some of the specific challenges encountered by the U.S. Army Center for Health Promotion and Preventive Medicine when performing indirect exposure health risk assessments for several demilitarization combustion facilities.

  8. A remote host facility for Intel hypercubes

    Energy Technology Data Exchange (ETDEWEB)

    Dunigan, T.H.

    1989-04-01

    The structure and use of a remote host facility for controlling application programs on an Intel hypercube are described. The facility permits an alternate UNIX host, such as a graphics workstation or supercomputer, connected by a TCP/IP network to the Intel cube manager processor to communicate with application programs running on the hypercube nodes. The facility supports both C and FORTRAN applications. 5 refs., 1 fig., 2 tabs.

  9. 40 CFR 267.18 - What are the standards for selecting the location of my facility?

    Science.gov (United States)

    2010-07-01

    ... the location of my facility? 267.18 Section 267.18 Protection of Environment ENVIRONMENTAL PROTECTION... FACILITIES OPERATING UNDER A STANDARDIZED PERMIT General Facility Standards § 267.18 What are the standards for selecting the location of my facility? (a) You may not locate portions of new facilities where...

  10. 19 CFR 142.24 - Special permit.

    Science.gov (United States)

    2010-04-01

    ... (CONTINUED) ENTRY PROCESS Special Permit for Immediate Delivery § 142.24 Special permit. (a) Conditions for issuance. At the discretion of the port director, a special permit for immediate delivery may be issued on... of a shipment of merchandise under a special permit for immediate delivery, the importer shall note a...

  11. PSD Permit Applications In Region 4

    Science.gov (United States)

    The following permits have been submitted to EPA Region 4 as Proposed Title V permits. While EPA has the right to a 45-day review period for all Proposed Title V permits, EPA Region 4 targets only a subset of these permits for comprehensive review.

  12. 50 CFR 13.27 - Permit suspension.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 1 2010-10-01 2010-10-01 false Permit suspension. 13.27 Section 13.27... GENERAL PERMIT PROCEDURES Permit Administration § 13.27 Permit suspension. (a) Criteria for suspension... Government. Such suspension shall remain in effect until the issuing officer determines that the...

  13. National Pollution Discharge Elimination System (NPDES) Facility Points, Region 9, 2007, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — Point geospatial dataset representing locations of NPDES Facilities. NPDES (National Pollution Discharge Elimination System) is an EPA permit program that regulates...

  14. Hanford facility dangerous waste permit application, 616 Nonradioactive dangerous waste storage facility

    Energy Technology Data Exchange (ETDEWEB)

    Price, S.M.

    1997-04-30

    This chapter provides information on the physical, chemical, and biological characteristics of the waste stored at the 616 NRDWSF. A waste analysis plan is included that describes the methodology used for determining waste types.

  15. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Science.gov (United States)

    2010-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To..., apply to construction permits and operating licenses subject to this appendix N. 2. Applications for...

  16. Forest Products Industry Permitting Information

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  17. Air Force Academy MS4 NPDES Permit

    Science.gov (United States)

    Under NPDES permit CO-R042007, the U.S. Air Force Academy is authorized to discharge from all municipal separate storm sewer system outfalls to the receiving waters specified in the permit in El Paso County, Colorado.

  18. 45 CFR 670.13 - Permit administration.

    Science.gov (United States)

    2010-10-01

    ... CONSERVATION OF ANTARCTIC ANIMALS AND PLANTS Permits § 670.13 Permit administration. (a) Issuance of the... U.S.C. 1531 et seq.) or any native bird which is protected under the Migratory Bird Treaty Act (16...

  19. Gulf of Mexico Shrimp Permit Landings Survey

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Data set contains annual shrimp landings at the permit level from 2005-current fishing year. This also contains annual value of permit holders shrimp landings by...

  20. State waste discharge permit application, 200-E chemical drain field

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field.

  1. State Waste Discharge Permit application, 183-N Backwash Discharge Pond

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE91NM-177 requires a series of permitting activities for liquid effluent discharges. Liquid effluents on the Hanford Site have been classified as Phase I, Phase II, and Miscellaneous Streams. The Consent Order No. DE91NM-177 establishes milestones for State Waste Discharge Permit application submittals for all Phase I and Phase II streams, as well as the following 11 Miscellaneous Streams as identified in Table 4 of the Consent Order No. DE91NM-177.

  2. Mammography Facilities

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Mammography Facility Database is updated periodically based on information received from the four FDA-approved accreditation bodies: the American College of...

  3. Health Facilities

    Science.gov (United States)

    Health facilities are places that provide health care. They include hospitals, clinics, outpatient care centers, and specialized care centers, such as birthing centers and psychiatric care centers. When you ...

  4. Canyon Facilities

    Data.gov (United States)

    Federal Laboratory Consortium — B Plant, T Plant, U Plant, PUREX, and REDOX (see their links) are the five facilities at Hanford where the original objective was plutonium removal from the uranium...

  5. 36 CFR 13.112 - Permit revocation.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Permit revocation. 13.112... NATIONAL PARK SYSTEM UNITS IN ALASKA Cabins General Provisions § 13.112 Permit revocation. (a) The... request for a hearing concerning the revocation, based on the cause listed above, of a permit or...

  6. 50 CFR 21.41 - Depredation permits.

    Science.gov (United States)

    2010-10-01

    ... PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Control of Depredating and Otherwise Injurious Birds § 21.41... control purposes. No permit is required merely to scare or herd depredating migratory birds other than... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Depredation permits. 21.41 Section 21.41...

  7. Permitting plan for Hanford tanks initiative

    Energy Technology Data Exchange (ETDEWEB)

    Bloom, J.W., Fluor Daniel Hanford

    1997-02-10

    This plan describes all the possible permitting actions that could be required to implement the Hanford Tanks Initiative Project (HTI). Since the HTI Project Plan has several decision points where possible future activities could be eliminated, not all permitting actions described will be implemented. The cost and schedule for the permitting actions are included.

  8. 36 CFR 13.164 - Permit terms.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Permit terms. 13.164 Section... PARK SYSTEM UNITS IN ALASKA Cabins Cabin Use for Subsistence Purposes § 13.164 Permit terms. The Superintendent shall, among other conditions, establish terms of a permit that: (a) Allow for use and...

  9. 78 FR 18420 - Special Permit Applications Actions

    Science.gov (United States)

    2013-03-26

    ... processing of, special permits from the Department of Transportation's Hazardous Material Regulations (49 CFR... permit S.P No. Applicant Regulation(s) thereof MODIFICATION SPECIAL PERMIT GRANTED 11470-M Veolia ES... Flanders, NJ. marking requirements. 15655-M Walt Disney Parks and 49 CFR 173.56(b) and To modify the...

  10. Federal Environmental Permitting Handbook. Environmental Guidance

    Energy Technology Data Exchange (ETDEWEB)

    1991-05-01

    The handbook consists of eight chapters addressing permitting and licensing requirements under the Resource Conservation and Recovery Act (RCRA), the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended by the Superfund Amendments and Reauthorization Act of 1986 (CERCLA/SARA), the Atomic Energy Act (AEA), the Clean Air Act (CAA), the Clean Water Act (CWA), the Federal Insectide, Fungicide, and Rodenticide Act (FIFRA), the Safe Drinking Water Act (SDWA), and the Toxic Substances Control Act (TSCA). Each chapter consists of: (1) an introduction to the statute and permitting requirements; (2) a diagram illustrating the relationship between permitting requirements under the statute being discussed and permitting requirements from other environmental statutes which may have to be addressed when applying for a particular permit (e.g., when applying for a RCRA permit, permits and permit applications under the CWA, CAA, SDWA, etc. would have to be listed in the RCRA permit application); and, (3) a compilation of the permitting requirements for the regulatory program resulting from the statute. In addition, the Handbook contains a permitting keyword index and a listing of hotline telephone numbers for each of the statutes.

  11. 40 CFR 124.9 - Administrative record for draft permits when EPA is the permitting authority.

    Science.gov (United States)

    2010-07-01

    ....9 Administrative record for draft permits when EPA is the permitting authority. (a) The provisions... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Administrative record for draft permits when EPA is the permitting authority. 124.9 Section 124.9 Protection of Environment...

  12. 40 CFR 124.18 - Administrative record for final permit when EPA is the permitting authority.

    Science.gov (United States)

    2010-07-01

    ....18 Administrative record for final permit when EPA is the permitting authority. (a) The Regional... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Administrative record for final permit when EPA is the permitting authority. 124.18 Section 124.18 Protection of Environment...

  13. 40 CFR 122.41 - Conditions applicable to all permits (applicable to State programs, see § 123.25).

    Science.gov (United States)

    2010-07-01

    ... disposal in violation of this permit which has a reasonable likelihood of adversely affecting human health...: (A) Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage; (B... caused by operational error, improperly designed treatment facilities, inadequate treatment facilities...

  14. Asian Facilities

    Science.gov (United States)

    Nakahata, M.

    2011-04-01

    Asian underground facilities are reviewed. The YangYang underground Laboratory in Korea and the Kamioka observatory in Japan are operational and several astrophysical experiments are running. Indian Neutrino Observatory(INO) and China JinPing Underground Laboratory (CJPL) are under construction and underground experiments are being prepared. Current activities and future prospects at those underground sites are described.

  15. 77 FR 41198 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Science.gov (United States)

    2012-07-12

    ... conservation responsibilities for affected species, and in consideration of section 10(a)(1)(A) of the... discretion of the Service Director. III. Permit Applications A. Endangered Species Applicant: Los Angeles Zoo... facility, Mountain View Conservation and Breeding Center, Langley, BC, Canada, for the purpose...

  16. 76 FR 56751 - Pesticide Experimental Use Permit; Receipt of Application; Comment Request

    Science.gov (United States)

    2011-09-14

    ... AGENCY Pesticide Experimental Use Permit; Receipt of Application; Comment Request AGENCY: Environmental... Pesticide Programs (OPP) Regulatory Public Docket (7502P), ] Environmental Protection Agency, 1200.... Deliveries are only accepted during the Docket Facility's normal hours of operation (8:30 a.m. to 4...

  17. 75 FR 30395 - Stakeholder Input; National Pollutant Discharge Elimination System (NPDES) Permit Requirements...

    Science.gov (United States)

    2010-06-01

    ... street flooding, recreational contact such as swimming and fishing, drinking contaminated water and... an NPDES permit. Sanitary sewers are part of the treatment works under the Clean Water Act and... alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes...

  18. WIPP Facility Work Plan for Solid Waste Management Units

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2001-02-25

    This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

  19. Building Permits, permits plus data base, Published in 2006, Washoe County.

    Data.gov (United States)

    NSGIC GIS Inventory (aka Ramona) — This Building Permits dataset, was produced all or in part from Published Reports/Deeds information as of 2006. It is described as 'permits plus data base'. Data by...

  20. 19 CFR 10.61 - Withdrawal permit.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false Withdrawal permit. 10.61 Section 10.61 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY... bond, when required, the port director shall issue a permit on Customs Form 7501 or 7512....

  1. Dielectric permitivity measurement of cotton lint

    Science.gov (United States)

    A technique was developed for making broad band measurements of cotton lint electrical permitivity. The fundamental electrical permitivity value of cotton lint at various densities and moisture contents; is beneficial for the future development of cotton moisture sensors as it provides a...

  2. 75 FR 54649 - Endangered Wildlife; Permits

    Science.gov (United States)

    2010-09-08

    ... Fish and Wildlife Service Endangered Wildlife; Permits AGENCY: Fish and Wildlife Service, Interior... Wildlife Service (Service), invite the public to comment on applications for permits to conduct enhancement..., U.S. Fish and Wildlife Service, 911 NE. 11th Avenue, Portland, OR 97232-4181. FOR...

  3. 45 CFR 3.24 - Parking permits.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Parking permits. 3.24 Section 3.24 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CONDUCT OF PERSONS AND TRAFFIC ON THE NATIONAL..., a person may not park a motor vehicle without displaying a parking permit, currently valid for...

  4. 32 CFR 552.90 - Permit office.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 3 2010-07-01 2010-07-01 true Permit office. 552.90 Section 552.90 National... CEMETERIES REGULATIONS AFFECTING MILITARY RESERVATIONS Fort Lewis Land Use Policy § 552.90 Permit office... non-training acess to the range complex. The office is open 0700-1900 hours, seven days a week,...

  5. 78 FR 36822 - Special Permit Applications

    Science.gov (United States)

    2013-06-19

    ... Pipeline and Hazardous Materials Safety Administration Special Permit Applications AGENCY: Pipeline And... Applications. SUMMARY: In accordance with the procedures governing the application for, and the processing of..., Subpart B), notice is hereby given of the actions on special permits applications in (May to May 2013...

  6. 9 CFR 104.3 - Permit application.

    Science.gov (United States)

    2010-01-01

    ....3 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE VIRUSES, SERUMS, TOXINS, AND ANALOGOUS PRODUCTS; ORGANISMS AND VECTORS PERMITS FOR BIOLOGICAL PRODUCTS § 104.3 Permit application. (a) Each person desiring to import a biological product shall make...

  7. Permitting plan for Hanford Tanks Initiative

    Energy Technology Data Exchange (ETDEWEB)

    Bloom, J.W.

    1998-03-19

    This plan describes all the permitting actions that have been identified as required to implement the Hanford Tanks Initiative. It reflects changes in the scope to the Hanford Tanks Initiative since the Rev. 0 plan was issued. The cost and schedule for the permitting actions are included.

  8. 30 CFR 740.13 - Permits.

    Science.gov (United States)

    2010-07-01

    ... necessary to support surface coal mining and reclamation operations. (B) An evaluation of impacts to the... regulatory authority has not yet rendered a final decision with respect to the permit application; and (iii... lands administered by a Federal land management agency. Upon receipt of a permit application package...

  9. 78 FR 43268 - Special Permit Applications

    Science.gov (United States)

    2013-07-19

    ... hazardous material. (modes 1, 2, 3, 4) 15860-N......... Apple Inc. 49 CFR To authorize the Cupertino, CA... modify the Inc. Baton 173.306(a)(3). special permit to Rouge, LA. reflect current statutes and... modify the Technologies special permit to Inc. (Former change a drawing Grantee: Conax number;...

  10. State Waste Discharge Permit application, 100-N Sewage Lagoon

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). This document constitutes the State Waste Discharge Permit application for the 100-N Sewage Lagoon. Since the influent to the sewer lagoon is domestic waste water, the State Waste Discharge Permit application for Public Owned Treatment Works Discharges to Land was used. Although the 100-N Sewage Lagoon is not a Public Owned Treatment Works, the Public Owned Treatment Works application is more applicable than the application for industrial waste water. The 100-N Sewage Lagoon serves the 100-N Area and other Hanford Site areas by receiving domestic waste from two sources. A network of sanitary sewer piping and lift stations transfers domestic waste water from the 100-N Area buildings directly to the 100-N Sewage Lagoon. Waste is also received by trucks that transport domestic waste pumped from on site septic tanks and holding tanks. Three ponds comprise the 100-N Sewage Lagoon treatment system. These include a lined aeration pond and stabilization pond, as well as an unlined infiltration pond. Both piped-in and trucked-in domestic waste is discharged directly into the aeration pond.

  11. Emission Facilities - Erosion & Sediment Control Facilities

    Data.gov (United States)

    NSGIC Education | GIS Inventory — An Erosion and Sediment Control Facility is a DEP primary facility type related to the Water Pollution Control program. The following sub-facility types related to...

  12. 78 FR 72830 - Migratory Bird Permits; Delegating Falconry Permitting Authority to 17 States

    Science.gov (United States)

    2013-12-04

    ... Permitting Authority to 17 States AGENCY: Fish and Wildlife Service, Interior. ACTION: Final rule. SUMMARY... have requested that we delegate permitting for falconry to the State, as provided under our regulations... relevant regulation at 50 CFR 21.29 governing the transfer of permitting authority to these States has...

  13. 50 CFR 18.31 - Scientific research permits and public display permits.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Scientific research permits and public... Scientific research permits and public display permits. The Director may, upon receipt of an application and... importation of marine mammals for scientific research purposes or for public display. (a) Application...

  14. 77 FR 22267 - Eagle Permits; Changes in the Regulations Governing Eagle Permitting

    Science.gov (United States)

    2012-04-13

    ... Fish and Wildlife Service 50 CFR Parts 13 and 22 RIN 1018-AX91 Eagle Permits; Changes in the Regulations Governing Eagle Permitting AGENCY: Fish and Wildlife Service, Interior. ACTION: Proposed rule. SUMMARY: We propose to revise the regulations for permits for nonpurposeful take of golden eagles...

  15. 77 FR 27174 - Eagle Permits; Changes in the Regulations Governing Eagle Permitting

    Science.gov (United States)

    2012-05-09

    ... Fish and Wildlife Service 50 CFR Parts 13 and 22 RIN 1018-AX91 Eagle Permits; Changes in the Regulations Governing Eagle Permitting AGENCY: Fish and Wildlife Service, Interior. ACTION: Proposed rule... 13, 2012, proposed rule to revise the regulations for permits for nonpurposeful take of golden...

  16. Resource Conservation and Recovery Act: Part B, Permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 1, Revison 1.0

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    This report contains information related to the permit application for the WIPP facility. Information is presented on solid waste management; personnel safety; emergency plans; site characterization; applicable regulations; decommissioning; and ground water monitoring requirements.

  17. Resource Conservation and Recovery Act Part B permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 7: Revision 1.0

    Energy Technology Data Exchange (ETDEWEB)

    1992-07-01

    This permit application (Vol. 7) for the WIPP facility contains appendices related to the following information: Ground water protection; personnel; solid waste management; and memorandums concerning environmental protection standards.

  18. Theme: Laboratory Facilities Improvement.

    Science.gov (United States)

    Miller, Glen M.; And Others

    1993-01-01

    Includes "Laboratory Facilities Improvement" (Miller); "Remodeling Laboratories for Agriscience Instruction" (Newman, Johnson); "Planning for Change" (Mulcahy); "Laboratory Facilities Improvement for Technology Transfer" (Harper); "Facilities for Agriscience Instruction" (Agnew et al.); "Laboratory Facility Improvement" (Boren, Dwyer); and…

  19. Facility Effluent Monitoring Plan for Pacific Northwest National Laboratory Balance-of-Plant Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Ballinger, Marcel Y.; Gervais, Todd L.

    2004-11-15

    located downstream of control technologies and just before discharge to the atmosphere. The need for monitoring airborne emissions of hazardous chemicals is established in the Hanford Site Air Operating Permit and in notices of construction. Based on the current potential-to-emit, the Hanford Site Air Operating Permit does not contain general monitoring requirements for BOP facilities. However, the permit identifies monitoring requirements for specific projects and buildings. Needs for future monitoring will be established by future permits issued pursuant to the applicable state and federal regulations. A number of liquid-effluent discharge systems serve the BOP facilities: sanitary sewer, process sewer, retention process sewer, and aquaculture system. Only the latter system discharges to the environment; the rest either discharge to treatment plants or to long-term storage. Routine compliance sampling of liquid effluents is only required at the Environmental Molecular Sciences Laboratory. Liquid effluents from other BOP facilities may be sampled or monitored to characterize facility effluents or to investigate discharges of concern. Effluent sampling and monitoring for the BOP facilities depends on the inventories, activities, and environmental permits in place for each facility. A description of routine compliance monitoring for BOP facilities is described in the BOP FEMP.

  20. Gulf of Mexico Shrimp Permit Gear Survey

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Data set contains annual vessel gear characterization of permit holders shrimp vessel. Data includes net type, TED type, BRD type, etc.

  1. 40 CFR 71.9 - Permit fees.

    Science.gov (United States)

    2010-07-01

    ... the Consumer Price Index. (2) Part 71 permit program costs and fees will be reviewed by the... Administrator, the changes will be published in the Federal Register. (o) Use of revenue. All fees,...

  2. 2011 EPA Pesticide General Permit (PGP)

    Data.gov (United States)

    U.S. Environmental Protection Agency — The 2011 EPA Pesticide General Permit (PGP) covers discharges of biological pesticides, and chemical pesticides that leave a residue, in areas where EPA is the NPDES...

  3. 2013 EPA Vessels General Permit (VGP)

    Data.gov (United States)

    U.S. Environmental Protection Agency — Information for any vessel that submitted a Notice of Intent (NOI), Notice of Termination (NOT), or annual report under EPA's 2013 Vessel General Permit (VGP)....

  4. Cheyenne Mountain Air Force Station NPDES Permit

    Science.gov (United States)

    Under NPDES permit CO-0034762, the Cheyenne Mountain Air Force Station is authorized to discharge from the interior storm drainage system and air exhaust stacks at the Cheyenne Mountain Complex, in El Paso County, Colorado, to tributaries Fountain Creek.

  5. Absaloka Mine South Extension NPDES Permit

    Science.gov (United States)

    Under NPDES permit MT-0030783, Westmoreland Resources, Inc. is authorized to discharge mine drainage from outfalls associated with the Absaloka Mine South Extension on the Crow Indian reservation near Hardin, Montana to Middle Fork of Sarpy Creek.

  6. 75 FR 2560 - Issuance of Permits

    Science.gov (United States)

    2010-01-15

    ...) the application was filed in good faith, (2) the granted permit would not operate to the disadvantage... County 74 FR 46222, September December 17, 2009 Zoo. 8, 2009. 225871 Lorenzo J. Ferraro..... 74 FR...

  7. 40 CFR 233.21 - General permits.

    Science.gov (United States)

    2010-07-01

    ... apply for an individual permit. This discretionary authority will be based on concerns for the aquatic... the discharger of his decision to exercise discretionary authority to require an individual...

  8. 77 FR 4271 - Special Permit Marking Removal

    Science.gov (United States)

    2012-01-27

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION... Administration (FRA), Department of Transportation (DOT). ACTION: Removal of obsolete Special Permit markings... first shopping event, whichever occurred first. This document relieves tank car owners from that...

  9. Web Air Permits (WAP R7)

    Data.gov (United States)

    U.S. Environmental Protection Agency — THIS DATA ASSET NO LONGER ACTIVE: This is metadata documentation for Web Air Permits in Region 7 (WAP R7), a Lotus Notes application that once tracked comment...

  10. 30 CFR 773.10 - Review of permit history.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Review of permit history. 773.10 Section 773.10... REQUIREMENTS FOR PERMITS AND PERMIT PROCESSING § 773.10 Review of permit history. (a) We, the regulatory authority, will rely upon the permit history information you, the applicant, submit under § 778.12 of this...

  11. 9 CFR 78.2 - Handling of certificates, permits, and “S” brand permits for interstate movement of animals.

    Science.gov (United States)

    2010-01-01

    ... âSâ brand permits for interstate movement of animals. 78.2 Section 78.2 Animals and Animal Products... certificates, permits, and “S” brand permits for interstate movement of animals. (a) Any certificate, permit, or “S” brand permit required by this part for the interstate movement of animals shall be...

  12. Permitting of Landfill Bioreactor Operations: Ten Years after ...

    Science.gov (United States)

    Prior to promulgation of the Rule, there were approximately 20 full-scale bioreactor projects in North America, including one in Canada. Of these, six were permitted by EPA (four Project XL sites and two projects listed separately under a cooperative research agreement at the Outer Loop Landfill in Kentucky). In March 2014, there were about 40 bioreactor projects reported, including 30 active RD&D projects in 11 approved states and one project on tribal lands. Wisconsin features the largest number of projects at 13, due primarily to the fact that landfill owners in the state must either eliminate landfill disposal of biodegradable materials or to achieve the complete stabilization of deposited organic waste at MSW landfills within 40 years after closure. Most landfill operators have selected a bioreactor approach to attempt to achieve the latter goal. In summary, only 16 of 50 (32%) states have currently adopted the Rule, meaning that development of RD&D permitting procedures that are consistent with EPA’s requirements has generally not occurred. The predominant single reason cited for not adopting the Rule was lack of interest amongst landfill facilities in the state. Subtitle D and its state derivatives already allow leachate recirculation over prescriptive (i.e., minimum technology) liner systems, which is often the primary goal of site operators seeking to control leachate treatment costs. Other reasons related to concerns over increased time, cost

  13. IFQ Halibut/Sablefish and CDQ Halibut Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Under the IFQ Halibut/Sablefish Permit Program and CDQ Halibut Permit Program permits are issued for harvesting and receiving/processing halibut, and non-trawl...

  14. State Waste Discharge Permit ST-4502 Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    BROWN, M.J.; LECLAIR, M.D.

    2000-09-27

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

  15. 78 FR 21146 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2013-04-09

    .... 552). Permit TE-98707A Applicant: Mitchell Lockhart, Sallisaw, Oklahoma. Applicant requests a new... Zoo and Aquarium. Permit TE-00347B Applicant: Alisha Powell, Sallisaw, Oklahoma. Applicant requests...

  16. H-Area Hazardous Waste Management Facility Semiannual Corrective Action Report, First and Second Quarter 1998, Volumes I and II

    Energy Technology Data Exchange (ETDEWEB)

    Chase, J.

    1998-10-30

    This report addresses groundwater quality and monitoring data during first and second quarter 1998 for the H-Area Hazardous Waste Management Facility (HWMF). The report fulfills the semiannual reporting requirements of Module III, Section D, of the 1995 Resource Conservation and Recovery Act (RCRA) Renewal Permit (South Carolina Hazardous and Mixed Waste Permit SC1-890-008-989), effective October 5, 1995 (hereinafter referred to as the RCRA permit), and Section C of the Underground Injection Control Permit Application (hereinafter referred to as the UIC permit). The HWMF is described in the Introduction of Module III, Section C, of the RCRA permit.

  17. North Slope, Alaska ESI: FACILITY (Facility Points)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains data for oil field facilities for the North Slope of Alaska. Vector points in this data set represent oil field facility locations. This data...

  18. 77 FR 66406 - Migratory Bird Permits; Delegating Falconry Permitting Authority to Seven States

    Science.gov (United States)

    2012-11-05

    ... significant economic impact on a substantial number of small entities. This rule delegates authority to States... Permitting Authority to Seven States AGENCY: Fish and Wildlife Service, Interior. ACTION: Final rule. SUMMARY... requested that we delegate permitting for falconry to the State, as provided under our regulations. We have...

  19. 76 FR 71910 - Migratory Bird Permits; States Delegated Falconry Permitting Authority; Technical Corrections to...

    Science.gov (United States)

    2011-11-21

    ... number of small entities. This rule delegates authority to States that have requested it, and those... Falconry Permitting Authority; Technical Corrections to the Regulations AGENCY: Fish and Wildlife Service... Carolina, Ohio, Oregon, Tennessee, Virginia, and Wyoming have requested that we delegate permitting for...

  20. 30 CFR 947.773 - Requirements for permits and permit processing.

    Science.gov (United States)

    2010-07-01

    ... control structures, roads, and other significant features contained in the application marked by flags. (c... regulations: (1) Department of Ecology: Surface Water Rights Permit, RCW 90.03.250 Dam Safety Approval, RCW 90....03.380 Ground Water Permit, RCW 90.44.050 New Source Construction Approval, RCW 79.94.152...

  1. Jupiter Laser Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Jupiter Laser Facility is an institutional user facility in the Physical and Life Sciences Directorate at LLNL. The facility is designed to provide a high degree...

  2. Basic Research Firing Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Basic Research Firing Facility is an indoor ballistic test facility that has recently transitioned from a customer-based facility to a dedicated basic research...

  3. Facility Registry Service (FRS)

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Facility Registry Service (FRS) provides an integrated source of comprehensive (air, water, and waste) environmental information about facilities across EPA,...

  4. Licensed Healthcare Facilities

    Data.gov (United States)

    California Department of Resources — The Licensed Healthcare Facilities point layer represents the locations of all healthcare facilities licensed by the State of California, Department of Health...

  5. High Throughput Facility

    Data.gov (United States)

    Federal Laboratory Consortium — Argonne?s high throughput facility provides highly automated and parallel approaches to material and materials chemistry development. The facility allows scientists...

  6. Aperture area measurement facility

    Data.gov (United States)

    Federal Laboratory Consortium — NIST has established an absolute aperture area measurement facility for circular and near-circular apertures use in radiometric instruments. The facility consists of...

  7. Environmental Toxicology Research Facility

    Data.gov (United States)

    Federal Laboratory Consortium — Fully-equipped facilities for environmental toxicology research The Environmental Toxicology Research Facility (ETRF) located in Vicksburg, MS provides over 8,200 ft...

  8. Licensed Healthcare Facilities

    Data.gov (United States)

    California Department of Resources — The Licensed Healthcare Facilities point layer represents the locations of all healthcare facilities licensed by the State of California, Department of Health...

  9. Residential Parking Permits and Parking Supply

    NARCIS (Netherlands)

    J. van Ommeren (Jos); J. de Groote (Jesper); G. Mingardo (Giuliano)

    2013-01-01

    textabstractWe estimate welfare losses of policies that provide on-street parking permits to residents almost free of charge in shopping districts. Our empirical results indicate that parking supply is far from perfectly price elastic, implying that there are substantial welfare losses related to un

  10. 36 CFR 13.162 - Permit issuance.

    Science.gov (United States)

    2010-07-01

    ...) In making a decision on a permit application, the Superintendent shall consider whether the use by local rural residents of a cabin or other structure for subsistence purposes is customary and... structure is “necessary to reasonably accommodate” the applicant's subsistence uses. In making...

  11. 27 CFR 22.24 - Permits.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Permits. 22.24 Section 22.24 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU, DEPARTMENT OF THE TREASURY LIQUORS DISTRIBUTION AND USE OF TAX-FREE ALCOHOL Administrative Provisions Authorities §...

  12. 27 CFR 20.25 - Permits.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Permits. 20.25 Section 20.25 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU, DEPARTMENT OF THE TREASURY LIQUORS DISTRIBUTION AND USE OF DENATURED ALCOHOL AND RUM Administrative Provisions...

  13. 75 FR 41233 - Issuance of Permits

    Science.gov (United States)

    2010-07-15

    ... application was filed in good faith, (2) the granted permit would not operate to the disadvantage of the... 62586; November April 01, 2010 Mexico, Museum of 30, 2009. Southwestern Biology. 08939A Los Angeles Zoo... University of 16, 2009. California at Berkeley. 228022 Metro Richmond Zoo..... 75 FR 427; January 5, April...

  14. 75 FR 12564 - Issuance of Permits

    Science.gov (United States)

    2010-03-16

    ...) the application was filed in good faith, (2) the granted permit would not operate to the disadvantage..., 2009 16, 2009. 220887 Fort Worth Zoo 74 FR 55062; October February 19, 2010 26, 2009. 223400 Earth... Zoo 74 FR 66675; December February 2, 2010 16, 2009. 231594 Seneca Park Zoo 74 FR 58977;...

  15. 40 CFR 71.25 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... of an emergency. An emergency constitutes an affirmative defense to an action brought for... such deviations and any corrective actions or preventive measures taken. The Administrator will define... requirements in the event of a challenge to any portions of the permit. (7) Provisions stating the...

  16. 50 CFR 665.203 - Permits.

    Science.gov (United States)

    2010-10-01

    .... If one or more persons on a vessel-based bottomfish fishing trip holds an MHI non-commercial permit... fishing occurs during or as a result of a vessel-based fishing trip, then the fishing trip is considered... incapacitation, vessel breakdowns, and the loss of the vessel at sea if the event prevented the vessel...

  17. 50 CFR 660.25 - Permits.

    Science.gov (United States)

    2010-10-01

    ..., accumulation limits, fees, and appeals are described at § 660.150, subpart D. (vi) C/P endorsement. A C/P... of permit ownership, accumulation limits, fees, and appeals are described at § 660.140, subpart D. (d... receiver to receive, purchase, or take custody, control or possession of landings from the Shorebased...

  18. 43 CFR 36.9 - Issuing permit.

    Science.gov (United States)

    2010-10-01

    ... purposes for which the affected area was established or is managed; (2) Requirements for restoration.... (5) Requirements to protect the interests of individuals living in the general area of the right-of-way permit who rely on the fish, wildlife and biotic resources of the area for subsistence...

  19. 30 CFR 773.17 - Permit conditions.

    Science.gov (United States)

    2010-07-01

    .... (e) The permittee shall take all possible steps to minimize any adverse impact to the environment or... Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY...

  20. 9 CFR 104.1 - Permit required.

    Science.gov (United States)

    2010-01-01

    ... Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE VIRUSES, SERUMS, TOXINS, AND ANALOGOUS PRODUCTS; ORGANISMS AND VECTORS PERMITS FOR BIOLOGICAL PRODUCTS § 104.1... biological product into the United States shall be issued in accordance with the regulations in this part....

  1. 77 FR 10183 - Reissuance of Nationwide Permits

    Science.gov (United States)

    2012-02-21

    ..., 2011, issue of the Federal Register (76 FR 9174), the U.S. Army Corps of Engineers (Corps) published... adopted the concept of general permits in its final rule published on July 25, 1975 (see 40 FR 31321). The... specific activities or situations that are not authorized, or for which a PCN is required to allow...

  2. 50 CFR 679.4 - Permits.

    Science.gov (United States)

    2010-10-01

    ... permits—(1) Operators of commercial fishing vessels using power troll gear. The operator of a fishing vessel using power troll gear may engage in commercial fishing for salmon in the Salmon Management Area if the operator: (i) Held a valid State of Alaska power troll permanent entry permit on May 15,...

  3. 50 CFR 648.4 - Vessel permits.

    Science.gov (United States)

    2010-10-01

    ... apply for a IFQ scallop permit who disputes NMFS's determination of the vessel's contribution factor... is in the process of construction or rerigging or under agreement or written contract for construction or rerigging, as of the effective baseline specification date in which case the baseline...

  4. 9 CFR 122.2 - Permits required.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Permits required. 122.2 Section 122.2 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE VIRUSES... Office of Management and Budget under control number 0579-0015)...

  5. 75 FR 44987 - Issuance of Permits

    Science.gov (United States)

    2010-07-30

    ... [Federal Register Volume 75, Number 146 (Friday, July 30, 2010)] [Notices] [Pages 44987-44988] [FR Doc No: 2010-18754] DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R9-IA-2010-N153] [96300-1671-0000-P5] Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice...

  6. Operation and Maintenance Manual for the Central Facilities Area Sewage Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Norm Stanley

    2011-02-01

    This Operation and Maintenance Manual lists operator and management responsibilities, permit standards, general operating procedures, maintenance requirements and monitoring methods for the Sewage Treatment Plant at the Central Facilities Area at the Idaho National Laboratory. The manual is required by the Municipal Wastewater Reuse Permit (LA-000141-03) the sewage treatment plant.

  7. Renewable Energy Permitting Barriers in Hawaii: Experience from the Field

    Energy Technology Data Exchange (ETDEWEB)

    Busche, S.; Donnelly, C.; Atkins, D.; Fields, R.; Black, C.

    2013-03-01

    This white paper presents a summary of the solicited input from permitting agencies and renewable energy developers on the permitting process in Hawaii to provide stakeholders in Hawaii, particularly those involved in permitting, with information on current permitting barriers that renewable energy developers are experiencing.

  8. 40 CFR 270.60 - Permits by rule.

    Science.gov (United States)

    2010-07-01

    ... treatment works. The owner or operator of a POTW which accepts for treatment hazardous waste, if the owner... ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Special Forms of Permits § 270.60 Permits by... operator of a barge or other vessel which accepts hazardous waste for ocean disposal, if the owner or...

  9. 14 CFR 437.9 - Issuance of an experimental permit.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Issuance of an experimental permit. 437.9..., DEPARTMENT OF TRANSPORTATION LICENSING EXPERIMENTAL PERMITS General Information § 437.9 Issuance of an experimental permit. The FAA issues an experimental permit authorizing an unlimited number of launches...

  10. 14 CFR 437.7 - Scope of an experimental permit.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Scope of an experimental permit. 437.7..., DEPARTMENT OF TRANSPORTATION LICENSING EXPERIMENTAL PERMITS General Information § 437.7 Scope of an experimental permit. An experimental permit authorizes launch or reentry of a reusable suborbital rocket....

  11. 14 CFR 437.5 - Eligibility for an experimental permit.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Eligibility for an experimental permit. 437... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING EXPERIMENTAL PERMITS General Information § 437.5 Eligibility for an experimental permit. The FAA will issue an experimental permit to a person to launch...

  12. 14 CFR 437.83 - Compliance with experimental permit.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Compliance with experimental permit. 437.83..., DEPARTMENT OF TRANSPORTATION LICENSING EXPERIMENTAL PERMITS Terms and Conditions of an Experimental Permit § 437.83 Compliance with experimental permit. A permittee must conduct any launch or reentry under...

  13. 14 CFR 437.11 - Duration of an experimental permit.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Duration of an experimental permit. 437.11..., DEPARTMENT OF TRANSPORTATION LICENSING EXPERIMENTAL PERMITS General Information § 437.11 Duration of an experimental permit. An experimental permit lasts for one year from the date it is issued. A permittee...

  14. 14 CFR 437.15 - Transfer of an experimental permit.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Transfer of an experimental permit. 437.15..., DEPARTMENT OF TRANSPORTATION LICENSING EXPERIMENTAL PERMITS General Information § 437.15 Transfer of an experimental permit. An experimental permit is not transferable....

  15. 50 CFR 15.24 - Permits for cooperative breeding.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 1 2010-10-01 2010-10-01 false Permits for cooperative breeding. 15.24... PLANTS WILD BIRD CONSERVATION ACT Permits and Approval of Cooperative Breeding Programs § 15.24 Permits for cooperative breeding. (a) Application requirements for permits for cooperative breeding....

  16. 40 CFR 124.41 - Definitions applicable to PSD permits.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Definitions applicable to PSD permits... PROGRAMS PROCEDURES FOR DECISIONMAKING Specific Procedures Applicable to PSD Permits § 124.41 Definitions applicable to PSD permits. Whenever PSD permits are processed under this part, the following terms shall have...

  17. 50 CFR 648.88 - Multispecies open access permit restrictions.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 8 2010-10-01 2010-10-01 false Multispecies open access permit... Management Measures for the NE Multispecies and Monkfish Fisheries § 648.88 Multispecies open access permit restrictions. (a) Handgear permit. A vessel issued a valid open access NE multispecies Handgear permit...

  18. Guide to research facilities

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    This Guide provides information on facilities at US Department of Energy (DOE) and other government laboratories that focus on research and development of energy efficiency and renewable energy technologies. These laboratories have opened these facilities to outside users within the scientific community to encourage cooperation between the laboratories and the private sector. The Guide features two types of facilities: designated user facilities and other research facilities. Designated user facilities are one-of-a-kind DOE facilities that are staffed by personnel with unparalleled expertise and that contain sophisticated equipment. Other research facilities are facilities at DOE and other government laboratories that provide sophisticated equipment, testing areas, or processes that may not be available at private facilities. Each facility listing includes the name and phone number of someone you can call for more information.

  19. RCRA Part A and Part B Permit Application for Waste Management Activities at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Protection and Technical Services

    2009-09-30

    This permit application provides facility information on the design, processes, and security features associated with the proposed Mixed Waste Disposal Unit. The unit will receive and dispose of onsite and offsite containerized low-level mixed waste (LLMW) that has an approved U.S. Department of Energy nexus.

  20. 9 CFR 93.204 - Import permits for poultry and for poultry test specimens for diagnostic purposes; and...

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Import permits for poultry and for poultry test specimens for diagnostic purposes; and reservation fees for space at quarantine facilities... SERVICE, DEPARTMENT OF AGRICULTURE EXPORTATION AND IMPORTATION OF ANIMALS (INCLUDING POULTRY) AND...

  1. 75 FR 40803 - FFP Missouri 2, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2010-07-14

    ... Federal Energy Regulatory Commission FFP Missouri 2, LLC; Notice of Preliminary Permit Application.... On April 5, 2010, FFP Missouri 2, LLC filed an application, pursuant to section 4(f) of the Federal...-phase overhead transmission line; and (7) appurtenant facilities. The FFP Missouri 2, LLC, project...

  2. 33 CFR 154.T150 - Temporary suspension of requirements to permit support of deepwater horizon spill response.

    Science.gov (United States)

    2010-07-01

    ... requirements to permit support of deepwater horizon spill response. 154.T150 Section 154.T150 Navigation and... support of deepwater horizon spill response. (a) Applicability. This section applies to— (1) Any facility... support of the response to the Deepwater Horizon Spill of National Significance; and (2) Any...

  3. Resource Conservation and Recovery Act, Part B permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 1, Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    This volume includes the following chapters: Waste Isolation Pilot Plant RCRA A permit application; facility description; waste analysis plan; groundwater monitoring; procedures to prevent hazards; RCRA contingency plan; personnel training; corrective action for solid waste management units; and other Federal laws.

  4. Solid Waste Land Applications with Permits by the Iowa DNR

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — All types of facilities that handle solid waste, including: sanitary landfills, appliance demanufacturing facilities, transfer stations, land application sites,...

  5. Building Permits, Buidling permits pulled from apprasial database and geocoded to loctions for all types of permits issued, Published in unknown, Johnson County AIMS.

    Data.gov (United States)

    NSGIC GIS Inventory (aka Ramona) — This Building Permits dataset, was produced all or in part from Published Reports/Deeds information as of unknown. It is described as 'Buidling permits pulled from...

  6. Transmission cost minimization strategies for wind-electric generating facilities

    Energy Technology Data Exchange (ETDEWEB)

    Gonzalez, R. [Northern States Power Company, Minneapolis, MN (United States)

    1997-12-31

    Integrating wind-electric generation facilities into existing power systems presents opportunities not encountered in conventional energy projects. Minimizing outlet cost requires probabilistic value-based analyses appropriately reflecting the wind facility`s operational characteristics. The wind resource`s intermittent nature permits relaxation of deterministic criteria addressing outlet configuration and capacity required relative to facility rating. Equivalent capacity ratings of wind generation facilities being a fraction of installed nameplate rating, outlet design studies contingency analyses can concentrate on this fractional value. Further, given its non-dispatchable, low capacity factor nature, a lower level of redundancy in outlet facilities is appropriate considering the trifling contribution to output unreliability. Further cost reduction opportunities arise from {open_quotes}wind speed/generator power output{close_quotes} and {open_quotes}wind speed/overhead conductor rating{close_quotes} functions` correlation. Proper analysis permits the correlation`s exploitation to safely increase line ratings. Lastly, poor correlation between output and utility load may permit use of smaller conductors, whose higher (mostly off-peak) losses are economically justifiable.

  7. Reliable Facility Location Problem with Facility Protection.

    Science.gov (United States)

    Tang, Luohao; Zhu, Cheng; Lin, Zaili; Shi, Jianmai; Zhang, Weiming

    2016-01-01

    This paper studies a reliable facility location problem with facility protection that aims to hedge against random facility disruptions by both strategically protecting some facilities and using backup facilities for the demands. An Integer Programming model is proposed for this problem, in which the failure probabilities of facilities are site-specific. A solution approach combining Lagrangian Relaxation and local search is proposed and is demonstrated to be both effective and efficient based on computational experiments on random numerical examples with 49, 88, 150 and 263 nodes in the network. A real case study for a 100-city network in Hunan province, China, is presented, based on which the properties of the model are discussed and some managerial insights are analyzed.

  8. 78 FR 73704 - Eagle Permits; Changes in the Regulations Governing Eagle Permitting

    Science.gov (United States)

    2013-12-09

    ... sufficient to offset the estimated costs associated with working with the applicants to develop site plans... protocols for testing their effectiveness. The Service anticipates limiting costs associated with studying... for working with applicants, assessing permit applications, and undertaking monitoring associated...

  9. Hanford Site air operating permit application

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

  10. 2010 Annual Wastewater Reuse Report for the Idaho National Laboratory Site's Central Facilities Area Sewage Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Mike lewis

    2011-02-01

    This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant from November 1, 2009, through October 31, 2010. The report contains the following information: • Site description • Facility and system description • Permit required monitoring data and loading rates • Status of special compliance conditions • Discussion of the facility’s environmental impacts. During the 2010 permit year, approximately 2.2 million gallons of treated wastewater was land-applied to the irrigation area at Central Facilities Area Sewage Treatment plant.

  11. 2012 Annual Wastewater Reuse Report for the Idaho National Laboratory Site's Central facilities Area Sewage Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Mike Lewis

    2013-02-01

    This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant from November 1, 2011, through October 31, 2012. The report contains the following information: • Site description • Facility and system description • Permit required monitoring data and loading rates • Status of compliance conditions and activities • Discussion of the facility’s environmental impacts. During the 2012 permit year, no wastewater was land-applied to the irrigation area of the Central Facilities Area Sewage Treatment Plant.

  12. 49 CFR 190.341 - Special permits.

    Science.gov (United States)

    2010-10-01

    ... environmental risks; (6) A description of any positive or negative impacts on affected stakeholders and a... information PHMSA may need to process the application including environmental analysis where necessary. (d...—to confirm long-term operational reliability of the pipeline facility. Note to paragraph (g): If...

  13. 34 CFR 395.35 - Terms of permit.

    Science.gov (United States)

    2010-07-01

    ..., periodicals, publications, confections, tobacco products, foods, beverages, chances for any lottery authorized... PROPERTY Federal Property Management § 395.35 Terms of permit. Every permit shall describe the location...

  14. 78 FR 27249 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-05-09

    ...-839213 Applicant: David P. Muth, Martinez, California The applicant requests a permit renewal to take...-804203 Applicant: Stephen J. Meyers, Moreno Valley, California The applicant requests a permit renewal to...

  15. 40 CFR 49.10049 - Permits to operate.

    Science.gov (United States)

    2010-07-01

    ... TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10049 Permits to operate. Permits to operate are required...

  16. Cumulative Permitted Vernal Pool Losses - Mitigation Sites [ds652

    Data.gov (United States)

    California Department of Resources — This shapefile represents mitigation areas included in the Vernal Pool Clean Water Act Permit Database, developed by AECOM for the Placer Land Trust. The permit...

  17. 75 FR 52965 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2010-08-30

    ... American burying beetle (Nicrophorus americanus) within Oklahoma, Arkansas, and Texas. Permit TE-037155.... Applicant requests a new permit for research and recovery purposes to obtain seeds of Welsh's milkweed... fonticola), San Marcos gambusia (Gambusia georgei), Comal Springs riffle beetle (Heterelmis...

  18. Environmental permitting strategies for the twenty-first century

    Energy Technology Data Exchange (ETDEWEB)

    Munson, B.E.; Wallis, C.M.

    1999-07-01

    Recent trends in economic markets have caused mining companies to look harder at reducing costs for collecting information, performing studies, and conducting other necessary activities to complete environmental permitting. In some cases, it may be in the operator's best interest to delay permitting and related expenditures to the extent possible. In most cases, however, agency mandates and the need to continue operations require that permits be obtained and maintained in the most expedient and economical way possible. This paper explores some basic approaches to environmental permitting which are intended to strategically guide the permitting process through the maze of requirements in a relatively straightforward manner. Through application of common sense and KISS (Keep it simple, stupid) the authors have found that permitting can be conducted in a quicker fashion than most applicants experience. The authors explore and explain some of these basic principles by drawing on their own experiences in the Arizona Aquifer Protection Permit and other environmental permit programs.

  19. Towards tradable permits for filamentous green algae pollution

    CSIR Research Space (South Africa)

    De Lange, Willem J

    2016-09-01

    Full Text Available a reserve price for pollution permits. The subsequent market making process is explained according to five steps including permit design, terms, conditions and transactional protocol, the monitoring system, piloting and implementation. The monetary...

  20. A Framework for Building Efficient Environmental Permitting Processes

    Directory of Open Access Journals (Sweden)

    Nicola Ulibarri

    2017-01-01

    Full Text Available Despite its importance as a tool for protecting air and water quality, and for mitigating impacts to protected species and ecosystems, the environmental permitting process is widely recognized to be inefficient and marked by delays. This article draws on a literature review and interviews with permitting practitioners to identify factors that contribute to delayed permit decisions. The sociopolitical context, projects that are complex or use novel technology, a fragmented and bureaucratic regulatory regime, serial permit applications and reviews, and applicant and permitting agency knowledge and resources each contribute to permitting inefficiency when they foster uncertainty, increase transaction costs, and allow divergent interests to multiply, yet remain unresolved. We then use the interviews to consider the potential of a collaborative dialogue between permitting agencies and applicants to mitigate these challenges, and argue that collaboration is well positioned to lessen permitting inefficiency.

  1. 76 FR 26313 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2011-05-06

    .... Applicant requests a new permit for husbandry and holding of green sea turtles (Chelonia mydas), hawksbill... display for two non-releasable green sea turtles (Chelonia mydas) at the Oklahoma Aquarium. Permit...

  2. Ouellette Thermal Test Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Thermal Test Facility is a joint Army/Navy state-of-the-art facility (8,100 ft2) that was designed to:Evaluate and characterize the effect of flame and thermal...

  3. Cold Vacuum Drying Facility

    Data.gov (United States)

    Federal Laboratory Consortium — Located near the K-Basins (see K-Basins link) in Hanford's 100 Area is a facility called the Cold Vacuum Drying Facility (CVDF).Between 2000 and 2004, workers at the...

  4. Dialysis Facility Compare

    Data.gov (United States)

    U.S. Department of Health & Human Services — Dialysis Facility Compare helps you find detailed information about Medicare-certified dialysis facilities. You can compare the services and the quality of care that...

  5. Explosive Components Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The 98,000 square foot Explosive Components Facility (ECF) is a state-of-the-art facility that provides a full-range of chemical, material, and performance analysis...

  6. Materiel Evaluation Facility

    Data.gov (United States)

    Federal Laboratory Consortium — CRREL's Materiel Evaluation Facility (MEF) is a large cold-room facility that can be set up at temperatures ranging from −20°F to 120°F with a temperature change...

  7. Armament Technology Facility (ATF)

    Data.gov (United States)

    Federal Laboratory Consortium — The Armament Technology Facility is a 52,000 square foot, secure and environmentally-safe, integrated small arms and cannon caliber design and evaluation facility....

  8. Integrated Disposal Facility

    Data.gov (United States)

    Federal Laboratory Consortium — Located near the center of the 586-square-mile Hanford Site is the Integrated Disposal Facility, also known as the IDF.This facility is a landfill similar in concept...

  9. Facilities for US Radioastronomy.

    Science.gov (United States)

    Thaddeus, Patrick

    1982-01-01

    Discusses major developments in radioastronomy since 1945. Topics include proposed facilities, very-long-baseline interferometric array, millimeter-wave telescope, submillimeter-wave telescope, and funding for radioastronomy facilities and projects. (JN)

  10. Facility Response Plan (FRP)

    Data.gov (United States)

    U.S. Environmental Protection Agency — A Facility Response Plan (FRP) demonstrates a facility's preparedness to respond to a worst case oil discharge. Under the Clean Water Act, as amended by the Oil...

  11. Financing Professional Sports Facilities

    OpenAIRE

    Baade, Robert A.; Victor A. Matheson

    2011-01-01

    This paper examines public financing of professional sports facilities with a focus on both early and recent developments in taxpayer subsidization of spectator sports. The paper explores both the magnitude and the sources of public funding for professional sports facilities.

  12. FDA Certified Mammography Facilities

    Science.gov (United States)

    ... Program Consumer Information (MQSA) Search for a Certified Facility Share Tweet Linkedin Pin it More sharing options ... Email Print This list of FDA Certified Mammography Facilities is updated weekly. If you click on Search ...

  13. Energetics Conditioning Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Energetics Conditioning Facility is used for long term and short term aging studies of energetic materials. The facility has 10 conditioning chambers of which 2...

  14. Energetics Conditioning Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Energetics Conditioning Facility is used for long term and short term aging studies of energetic materials. The facility has 10 conditioning chambers of which 2...

  15. Environmental Toxicology Research Facility

    Data.gov (United States)

    Federal Laboratory Consortium — Fully-equipped facilities for environmental toxicology researchThe Environmental Toxicology Research Facility (ETRF) located in Vicksburg, MS provides over 8,200 ft...

  16. Ouellette Thermal Test Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Thermal Test Facility is a joint Army/Navy state-of-the-art facility (8,100 ft2) that was designed to: Evaluate and characterize the effect of flame and thermal...

  17. Projectile Demilitarization Facilities

    Data.gov (United States)

    Federal Laboratory Consortium — The Projectile Wash Out Facility is US Army Ammunition Peculiar Equipment (APE 1300). It is a pilot scale wash out facility that uses high pressure water and steam...

  18. Process for evaluation of renewal of the operating permit for Garona NPP.; Proceso para la evaluacion de la renovacion de la autorizacion de explotacion de Garona

    Energy Technology Data Exchange (ETDEWEB)

    Zarzuela Jimenez, J.

    2009-07-01

    Process for evaluation of renewal of the operating permit for Garona NPP. The Santa Maria de Garona nuclear power plant has requested the renewal of its operating permit for a period of ten years, this implying extension of the operating lifetime of the facility beyond the 40 years originally established. This article explains the process of evaluation that the CN is carrying out in order to draw up a report on the technical feasibility of this proposal. (Author)

  19. 78 FR 53493 - Presidential Permits: NOVA Chemicals Inc. Line 20 Facilities

    Science.gov (United States)

    2013-08-29

    ... for their safe operation, and in compliance with prevailing environmental standards and regulations... those authorities under Executive Order 13337, 69 FR 25299 (2004), and Department of State Delegation...

  20. WIPP Facility Work Plan for Solid Waste Management Units

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2000-02-25

    This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED’s guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA

  1. Preliminary design for a maglev development facility

    Energy Technology Data Exchange (ETDEWEB)

    Coffey, H.T.; He, J.L.; Chang, S.L.; Bouillard, J.X.; Chen, S.S.; Cai, Y.; Hoppie, L.O.; Lottes, S.A.; Rote, D.M. [Argonne National Lab., IL (United States); Zhang, Z.Y. [Polytechnic Univ., Brooklyn, NY (United States); Myers, G.; Cvercko, A. [Sterling Engineering, Westchester, IL (United States); Williams, J.R. [Alfred Benesch and Co., Chicago, IL (United States)

    1992-04-01

    A preliminary design was made of a national user facility for evaluating magnetic-levitation (maglev) technologies in sizes intermediate between laboratory experiments and full-scale systems. A technical advisory committee was established and a conference was held to obtain advice on the potential requirements of operational systems and how the facility might best be configured to test these requirements. The effort included studies of multiple concepts for levitating, guiding, and propelling maglev vehicles, as well as the controls, communications, and data-acquisition and -reduction equipment that would be required in operating the facility. Preliminary designs for versatile, dual 2-MVA power supplies capable of powering attractive or repulsive systems were developed. Facility site requirements were identified. Test vehicles would be about 7.4 m (25 ft) long, would weigh form 3 to 7 metric tons, and would operate at speeds up to 67 m/s (150 mph) on a 3.3-km (2.05-mi) elevated guideway. The facility would utilize modular vehicles and guideways, permitting the substitution of levitation, propulsion, and guideway components of different designs and materials for evaluation. The vehicle would provide a test cell in which individual suspension or propulsion components or subsystems could be tested under realistic conditions. The system would allow economical evaluation of integrated systems under varying weather conditions and in realistic geometries.

  2. Preliminary design for a maglev development facility

    Energy Technology Data Exchange (ETDEWEB)

    Coffey, H.T.; He, J.L.; Chang, S.L.; Bouillard, J.X.; Chen, S.S.; Cai, Y.; Hoppie, L.O.; Lottes, S.A.; Rote, D.M. (Argonne National Lab., IL (United States)); Zhang, Z.Y. (Polytechnic Univ., Brooklyn, NY (United States)); Myers, G.; Cvercko, A. (Sterling Engineering, Westchester, IL (United States)); Williams, J.R. (Alfred Benesch and Co., Chicago, IL (United States))

    1992-04-01

    A preliminary design was made of a national user facility for evaluating magnetic-levitation (maglev) technologies in sizes intermediate between laboratory experiments and full-scale systems. A technical advisory committee was established and a conference was held to obtain advice on the potential requirements of operational systems and how the facility might best be configured to test these requirements. The effort included studies of multiple concepts for levitating, guiding, and propelling maglev vehicles, as well as the controls, communications, and data-acquisition and -reduction equipment that would be required in operating the facility. Preliminary designs for versatile, dual 2-MVA power supplies capable of powering attractive or repulsive systems were developed. Facility site requirements were identified. Test vehicles would be about 7.4 m (25 ft) long, would weigh form 3 to 7 metric tons, and would operate at speeds up to 67 m/s (150 mph) on a 3.3-km (2.05-mi) elevated guideway. The facility would utilize modular vehicles and guideways, permitting the substitution of levitation, propulsion, and guideway components of different designs and materials for evaluation. The vehicle would provide a test cell in which individual suspension or propulsion components or subsystems could be tested under realistic conditions. The system would allow economical evaluation of integrated systems under varying weather conditions and in realistic geometries.

  3. Preliminary design for a MAGLEV development facility

    Science.gov (United States)

    Coffey, H. T.; He, J. L.; Chang, S. L.; Bouillard, J. X.; Chen, S. S.; Cai, Y.; Hoppie, L. O.; Lottes, S. A.; Rote, D. M.; Zhang, Z. Y.

    1992-04-01

    A preliminary design was made of a national user facility for evaluating magnetic-levitation (maglev) technologies in sizes intermediate between laboratory experiments and full-scale systems. A technical advisory committee was established and a conference was held to obtain advice on the potential requirements of operational systems and how the facility might best be configured to test these requirements. The effort included studies of multiple concepts for levitating, guiding, and propelling maglev vehicles, as well as the controls, communications, and data-acquisition and -reduction equipment that would be required in operating the facility. Preliminary designs for versatile, dual 2-MVA power supplies capable of powering attractive or repulsive systems were developed. Facility site requirements were identified. Test vehicles would be about 7.4 m (25 ft) long, would weigh from 3 to 7 metric tons, and would operate at speeds up to 67 m/s (150 mph) on a 3.3-km (2.05-mi) elevated guideway. The facility would utilize modular vehicles and guideways, permitting the substitution of levitation, propulsion, and guideway components of different designs and materials for evaluation. The vehicle would provide a test cell in which individual suspension or propulsion components or subsystems could be tested under realistic conditions. The system would allow economical evaluation of integrated systems under varying weather conditions and in realistic geometries.

  4. 46 CFR 169.211 - Permit to proceed for repair.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Permit to proceed for repair. 169.211 Section 169.211... Inspection and Certification Certificate of Inspection § 169.211 Permit to proceed for repair. (a) The Officer in Charge, Marine Inspection, may issue a permit to proceed to another port for repair, Form...

  5. Markets for tradeable emission and ambient permits : A dynamic approach

    NARCIS (Netherlands)

    Ermoliev, Y; Michalevich, M; Nentjes, A

    This paper discusses trade mechanisms in pollution permit markets. Proofs are given, that sequential, bilateral trade in tradeable emissions permits converges to a market equilibrium with minimal total costs of pollution control. If ambient or deposition permits are traded, the convergence of

  6. 75 FR 45650 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-08-03

    ... Fish and Wildlife Service Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and... endangered species. The Endangered Species Act requires that we invite public comment on this permit... issuance of enhancement of survival permit to conduct certain activities with endangered species...

  7. 50 CFR 20.64 - Foreign export permits.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Foreign export permits. 20.64 Section 20... WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD HUNTING Importations § 20.64 Foreign export permits. No... such birds are accompanied by export permits, tags, or other documentation required by applicable...

  8. 21 CFR 1312.22 - Application for export permit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Application for export permit. 1312.22 Section... EXPORTATION OF CONTROLLED SUBSTANCES Exportation of Controlled Substances § 1312.22 Application for export permit. (a) An application for a permit to export controlled substances shall be made on DEA Form 161...

  9. 21 CFR 1312.23 - Issuance of export permit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Issuance of export permit. 1312.23 Section 1312.23... CONTROLLED SUBSTANCES Exportation of Controlled Substances § 1312.23 Issuance of export permit. (a) The... regulation in § 1312.30 of this part be exported only pursuant to the issuance of an export permit. The...

  10. 76 FR 75897 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2011-12-05

    ...-57473A Applicant: Stephen Ramirez, San Marcos, Texas. Applicant requests a new permit for research and..., San Antonio, Texas. Applicant requests an amendment to a current permit for husbandry and holding of..., San Antonio, Texas. Permit TE-58781A Applicant: University of Arizona, Tucson, Arizona....

  11. 76 FR 39368 - Migratory Bird Permits; Abatement Regulations

    Science.gov (United States)

    2011-07-06

    ... migratory bird abatement permit. On January 12, 2007, we published a Federal Register notice (72 FR 1556..., we published a Federal Register notice (72 FR 69705-69706) announcing final permit conditions. This... Fish and Wildlife Service 50 CFR Part 21 RIN 1018-AW75 Migratory Bird Permits; Abatement...

  12. 25 CFR 173.13 - Permit not a lease.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Permit not a lease. 173.13 Section 173.13 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER CONCESSIONS, PERMITS AND LEASES ON LANDS WITHDRAWN OR ACQUIRED IN CONNECTION WITH INDIAN IRRIGATION PROJECTS § 173.13 Permit not a lease. Any...

  13. 77 FR 24470 - Marine Mammals; Photography Permit File No. 17032

    Science.gov (United States)

    2012-04-24

    ... National Oceanic and Atmospheric Administration RIN 0648-XA929 Marine Mammals; Photography Permit File No... conduct commercial/educational photography in Alaska. ADDRESSES: The permit and related documents are.../educational photography had been submitted by the above- named applicant. The requested permit has been...

  14. 76 FR 33337 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-06-08

    ..., Fort Hunter Liggett, California. The applicant requests a permit to take (harass by survey, capture... Fort Hunter Liggett, Monterey County, California, for the purpose of enhancing the species' survival. Permit No. TE-42833A Applicant: Ian Maunsell, San Diego, California. The applicant requests a permit...

  15. 33 CFR 325.6 - Duration of permits.

    Science.gov (United States)

    2010-07-01

    ... Section 325.6 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROCESSING OF DEPARTMENT OF THE ARMY PERMITS § 325.6 Duration of permits. (a) General. DA permits... issued for the transport of dredged material for the purpose of disposing of it in ocean waters...

  16. 49 CFR 231.20 - Variation in size permitted.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Variation in size permitted. 231.20 Section 231.20..., DEPARTMENT OF TRANSPORTATION RAILROAD SAFETY APPLIANCE STANDARDS § 231.20 Variation in size permitted. To... total variation of 5 percent below size given is permitted....

  17. 25 CFR 167.11 - Tenure of grazing permits.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Tenure of grazing permits. 167.11 Section 167.11 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER NAVAJO GRAZING REGULATIONS § 167.11 Tenure of grazing permits. (a) All active regular grazing permits shall be for one year and shall...

  18. Study of parameters of a facility generating compressive plasma flows

    Science.gov (United States)

    Leyvi, A. Ya

    2017-05-01

    The prosperity of plasma technologies stimulates making of a facility generating compressive plasma flows at the South Ural State University. The facility is a compact-geometry magnetoplasma compressor with the following parameters: stored energy up to 15 kJ, voltage of a bank from 3 to 5 kV; nitrogen, air, and other gases can serve as its operating gas. The investigation of parameters of the facility showed the following parameters of compressive plasma flows: impulse duration of up to 120 μs, discharge current of 50-120 kA, speed of plasma flow of 15-30 km/s. By contrast to the available facilities, the parameters of the developed facility can be adjusted in a wide range of voltage from 2 kV to 10 kV, its design permits generating CPF in horizontal and vertical positions.

  19. Proposed modifications to the RCRA post-closure permit for the Upper East Fork Poplar Creek Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    This report presents proposed modifications to the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Upper East Fork Poplar Creek Hydrogeologic Regime (permit number TNHW-088, EPA ID No. TN3 89 009 0001). The modifications are proposed to: (1) revise the current text for two of the Permit Conditions included in Permit Section II - General Facility Conditions, and (2) update the PCP with revised versions of the Y-12 Plant Groundwater Protection Program (GWPP) technical field procedures included in several of the Permit Attachments. The updated field procedures and editorial revisions are Class 1 permit modifications, as specified in Title 40, Code of Federal Regulations (CFR) {section}270.42; Appendix I - Classification of Permit Modifications. These modifications are summarized below.

  20. Pressurized burner test facility

    Energy Technology Data Exchange (ETDEWEB)

    Maloney, D.J.; Norton, T.S.; Hadley, M.A. [Morgantown Energy Technology Center, WV (United States)

    1993-06-01

    The Morgantown Energy Technology Center (METC) is currently fabricating a high-pressure burner test facility. The facility was designed to support the development of gas turbine combustion systems fired on natural gas and coal-derived gaseous fuels containing fuel-bound nitrogen. Upon completion of fabrication and shake-down testing in October 1993, the facility will be available for use by industrial and university partners through Cooperative Research and Development Agreements (CRADAs) or through other cooperative arrangements. This paper describes the burner test facility and associated operating parameter ranges and informs interested parties of the availability of the facility.

  1. 76 FR 36917 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2011-06-23

    ... AGENCY Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for TransAlta Centralia Generation, LLC--Coal- Fired Power Plant AGENCY: Environmental Protection Agency (EPA... to a citizen petition asking EPA to object to an operating permit issued by the Southwest Clean...

  2. 75 FR 81139 - Migratory Bird Permits; States Delegated Falconry Permitting Authority; Technical Corrections to...

    Science.gov (United States)

    2010-12-27

    ... number of small entities. This rule delegates authority to States that have requested it, and those... Falconry Permitting Authority; Technical Corrections to the Regulations AGENCY: Fish and Wildlife Service..., South Dakota, and Washington have requested that we, the U.S. Fish and Wildlife Service, delegate...

  3. 14 CFR 211.20 - Initial foreign air carrier permit or transfer of a permit.

    Science.gov (United States)

    2010-01-01

    ... TRANSPORTATION (AVIATION PROCEEDINGS) ECONOMIC REGULATIONS APPLICATIONS FOR PERMITS TO FOREIGN AIR CARRIERS..., etc., from the beginning of operations to the present. Also, if the applicant is a new airline (i.e., an airline that began direct air services within the past 12 months), briefly summarize the business...

  4. 30 CFR 937.773 - Requirements for permits and permit processing.

    Science.gov (United States)

    2010-07-01

    ... on State lands (ORS 273.005-273.815); Solid Waste Disposal Permits, Hazardous Waste Transportation.... 937.773 Section 937.773 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE OREGON...

  5. Permit Allocation in Emissions Trading using the Boltzmann Distribution

    CERN Document Server

    Park, Ji-Won; Isard, Walter

    2011-01-01

    In emissions trading, the initial permit allocation is an intractable issue because it needs to be essentially fair to the participating countries. There are many ways to distribute a given total amount of emissions permits among countries, but the existing distribution methods such as auctioning and grandfathering have been debated. Here we describe a new model for permit allocation in emissions trading using the Boltzmann distribution. The Boltzmann distribution is introduced to permit allocation by combining it with concepts in emissions trading. A price determination mechanism for emission permits is then developed in relation to the {\\beta} value in the Boltzmann distribution. Finally, it is demonstrated how emissions permits can be practically allocated among participating countries in empirical results. The new allocation model using the Boltzmann distribution describes a most probable, natural, and unbiased distribution of emissions permits among multiple countries. Based on its simplicity and versati...

  6. Facility Effluent Monitoring Plan determinations for the 600 Area facilities

    Energy Technology Data Exchange (ETDEWEB)

    Nickels, J.M.

    1991-08-01

    This document determines the need for Facility Effluent Monitoring Plans for Westinghouse Hanford Company's 600 Area facilities on the Hanford Site. The Facility Effluent Monitoring Plan determinations were prepared in accordance with A Guide For Preparing Hanford Site Facility Effluent Monitoring Plans (WHC 1991). Five major Westinghouse Hanford Company facilities in the 600 Area were evaluated: the Purge Water Storage Facility, 212-N, -P, and -R Facilities, the 616 Facility, and the 213-J K Storage Vaults. Of the five major facilities evaluated in the 600 Area, none will require preparation of a Facility Effluent Monitoring Plan.

  7. Synchrotron radiation facilities

    CERN Multimedia

    1972-01-01

    Particularly in the past few years, interest in using the synchrotron radiation emanating from high energy, circular electron machines has grown considerably. In our February issue we included an article on the synchrotron radiation facility at Frascati. This month we are spreading the net wider — saying something about the properties of the radiation, listing the centres where synchrotron radiation facilities exist, adding a brief description of three of them and mentioning areas of physics in which the facilities are used.

  8. Thermal distortion test facility

    Science.gov (United States)

    Stapp, James L.

    1995-02-01

    The thermal distortion test facility (TDTF) at Phillips Laboratory provides precise measurements of the distortion of mirrors that occurs when their surfaces are heated. The TDTF has been used for several years to evaluate mirrors being developed for high-power lasers. The facility has recently undergone some significant upgrades to improve the accuracy with which mirrors can be heated and the resulting distortion measured. The facility and its associated instrumentation are discussed.

  9. Materials Characterization Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Materials Characterization Facility enables detailed measurements of the properties of ceramics, polymers, glasses, and composites. It features instrumentation...

  10. Mobile Solar Tracker Facility

    Data.gov (United States)

    Federal Laboratory Consortium — NIST's mobile solar tracking facility is used to characterize the electrical performance of photovoltaic panels. It incorporates meteorological instruments, a solar...

  11. Universal Drive Train Facility

    Data.gov (United States)

    Federal Laboratory Consortium — This vehicle drive train research facility is capable of evaluating helicopter and ground vehicle power transmission technologies in a system level environment. The...

  12. Composite Structures Manufacturing Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Composite Structures Manufacturing Facility specializes in the design, analysis, fabrication and testing of advanced composite structures and materials for both...

  13. Neutron Therapy Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Neutron Therapy Facility provides a moderate intensity, broad energy spectrum neutron beam that can be used for short term irradiations for radiobiology (cells)...

  14. Catalytic Fuel Conversion Facility

    Data.gov (United States)

    Federal Laboratory Consortium — This facility enables unique catalysis research related to power and energy applications using military jet fuels and alternative fuels. It is equipped with research...

  15. Heated Tube Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Heated Tube Facility at NASA GRC investigates cooling issues by simulating conditions characteristic of rocket engine thrust chambers and high speed airbreathing...

  16. Engine Test Facility (ETF)

    Data.gov (United States)

    Federal Laboratory Consortium — The Air Force Arnold Engineering Development Center's Engine Test Facility (ETF) test cells are used for development and evaluation testing of propulsion systems for...

  17. High Combustion Research Facility

    Data.gov (United States)

    Federal Laboratory Consortium — At NETL's High-Pressure Combustion Research Facility in Morgantown, WV, researchers can investigate new high-pressure, high-temperature hydrogen turbine combustion...

  18. Geospatial Data Analysis Facility

    Data.gov (United States)

    Federal Laboratory Consortium — Geospatial application development, location-based services, spatial modeling, and spatial analysis are examples of the many research applications that this facility...

  19. Geodynamics Research Facility

    Data.gov (United States)

    Federal Laboratory Consortium — This GSL facility has evolved over the last three decades to support survivability and protective structures research. Experimental devices include three gas-driven...

  20. Imagery Data Base Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Imagery Data Base Facility supports AFRL and other government organizations by providing imagery interpretation and analysis to users for data selection, imagery...

  1. Pavement Testing Facility

    Data.gov (United States)

    Federal Laboratory Consortium — Comprehensive Environmental and Structural Analyses The ERDC Pavement Testing Facility, located on the ERDC Vicksburg campus, was originally constructed to provide...

  2. Nonlinear Materials Characterization Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Nonlinear Materials Characterization Facility conducts photophysical research and development of nonlinear materials operating in the visible spectrum to protect...

  3. Geophysical Research Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Geophysical Research Facility (GRF) is a 60 ft long qaodmasdkwaspemas5ajkqlsmdqpakldnzsdfls 22 ft wide qaodmasdkwaspemas4ajkqlsmdqpakldnzsdfls 7 ft deep concrete...

  4. Transonic Experimental Research Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Transonic Experimental Research Facility evaluates aerodynamics and fluid dynamics of projectiles, smart munitions systems, and sub-munitions dispensing systems;...

  5. Flexible Electronics Research Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Flexible Electronics Research Facility designs, synthesizes, tests, and fabricates materials and devices compatible with flexible substrates for Army information...

  6. DUPIC facility engineering

    Energy Technology Data Exchange (ETDEWEB)

    Park, J. J.; Lee, H. H.; Kim, K. H. and others

    2000-03-01

    The objectives of this study are (1) the refurbishment for PIEF(Post Irradiation Examination Facility) and M6 hot-cell in IMEF(Irradiated Material Examination Facility), (2) the establishment of the compatible facility for DUPIC fuel fabrication experiments which is licensed by government organization, and (3) the establishment of the transportation system and transportation cask for nuclear material between facilities. The report for this project describes following contents, such as objectives, necessities, scope, contents, results of current step, R and D plan in future and etc.

  7. Textiles Performance Testing Facilities

    Data.gov (United States)

    Federal Laboratory Consortium — The Textiles Performance Testing Facilities has the capabilities to perform all physical wet and dry performance testing, and visual and instrumental color analysis...

  8. Joint Computing Facility

    Data.gov (United States)

    Federal Laboratory Consortium — Raised Floor Computer Space for High Performance Computing The ERDC Information Technology Laboratory (ITL) provides a robust system of IT facilities to develop and...

  9. GPS Test Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Global Positioning System (GPS) Test Facility Instrumentation Suite (GPSIS) provides great flexibility in testing receivers by providing operational control of...

  10. Magnetics Research Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Magnetics Research Facility houses three Helmholtz coils that generate magnetic fields in three perpendicular directions to balance the earth's magnetic field....

  11. Target Assembly Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Target Assembly Facility integrates new armor concepts into actual armored vehicles. Featuring the capability ofmachining and cutting radioactive materials, it...

  12. Facility Environmental Management System

    Data.gov (United States)

    Federal Laboratory Consortium — This is the Web site of the Federal Highway Administration's (FHWA's) Turner-Fairbank Highway Research Center (TFHRC) facility Environmental Management System (EMS)....

  13. Proximal Probes Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Proximal Probes Facility consists of laboratories for microscopy, spectroscopy, and probing of nanostructured materials and their functional properties. At the...

  14. Manufacturing Demonstration Facility (MDF)

    Data.gov (United States)

    Federal Laboratory Consortium — The U.S. Department of Energy Manufacturing Demonstration Facility (MDF) at Oak Ridge National Laboratory (ORNL) provides a collaborative, shared infrastructure to...

  15. Pavement Testing Facility

    Data.gov (United States)

    Federal Laboratory Consortium — Comprehensive Environmental and Structural AnalysesThe ERDC Pavement Testing Facility, located on the ERDC Vicksburg campus, was originally constructed to provide an...

  16. n_TOF facility past and future

    CERN Document Server

    Vlachoudis, V

    2010-01-01

    The neutron Time of Flight (n_TOF) facility at CERN is a source of high flux of neutrons obtained by the spallation process of 20 GeV/c protons onto a solid lead target and the remarkable beam intensity of the Proton Synchrotron (PS). From November 2008 the n_TOF facility resumed operation after a halt of 4 years due to radio-protection issues. It features a new lead spallation target with a more robust design, more efficient cooling, separate moderator circuit, target area ventilation and most important without any loss of the unique neutron performances of the previous target. Moreover the separate moderator circuit will permit in the future the use of borated or heavy water instead of normal water to reduce the 2.2 MeV gamma background for the neutron capture measurements. The facility has been commissioned in Nov 2008, with performances similar of the previous target and predicted by Monte Carlo simulations. The facility will resume operation for physics from May 2009 with 4 experimental proposals already...

  17. Watershed-based point sources permitting strategy and dynamic permit-trading analysis.

    Science.gov (United States)

    Ning, Shu-Kuang; Chang, Ni-Bin

    2007-09-01

    Permit-trading policy in a total maximum daily load (TMDL) program may provide an additional avenue to produce environmental benefit, which closely approximates what would be achieved through a command and control approach, with relatively lower costs. One of the important considerations that might affect the effective trading mechanism is to determine the dynamic transaction prices and trading ratios in response to seasonal changes of assimilative capacity in the river. Advanced studies associated with multi-temporal spatially varied trading ratios among point sources to manage water pollution hold considerable potential for industries and policy makers alike. This paper aims to present an integrated simulation and optimization analysis for generating spatially varied trading ratios and evaluating seasonal transaction prices accordingly. It is designed to configure a permit-trading structure basin-wide and provide decision makers with a wealth of cost-effective, technology-oriented, risk-informed, and community-based management strategies. The case study, seamlessly integrating a QUAL2E simulation model with an optimal waste load allocation (WLA) scheme in a designated TMDL study area, helps understand the complexity of varying environmental resources values over space and time. The pollutants of concern in this region, which are eligible for trading, mainly include both biochemical oxygen demand (BOD) and ammonia-nitrogen (NH3-N). The problem solution, as a consequence, suggests an array of waste load reduction targets in a well-defined WLA scheme and exhibits a dynamic permit-trading framework among different sub-watersheds in the study area. Research findings gained in this paper may extend to any transferable dynamic-discharge permit (TDDP) program worldwide.

  18. Geothermal policy development program: expediting the local geothermal permitting process

    Energy Technology Data Exchange (ETDEWEB)

    1981-07-01

    For a number of years, concerns have been raised about the length of time and the complexity involved in obtaining required permits in order to develop the geothermal resource at the Geysers. Perhaps the most important factor is jurisdiction. At the Geysers, all three levels of government - local, state, and federal - exercise significant authority over various aspects of geothermal development. In addition, several agencies within each governmental level play an active role in the permitting process. The present study is concerned primarily with the local permitting process, and the ways in which this process could be expedited. This report begins by looking at the local role in the overall permitting process, and then reviews the findings and conclusions that have been reached in other studies of the problem. This is followed by a case study evaluation of recent permitting experience in the four Geysers-Calistoga KGRA counties, and the report concludes by outlining several approaches to expediting the local permitting process.

  19. 78 FR 12776 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2013-02-25

    ... (Eretmochelys imbricata) within Sea Life Aquarium, Grapevine, Texas. Permit TE-92366A Applicant: Kimley-Horn and... borealis) within Alabama, Arkansas, Florida, Georgia, Louisiana, Mississippi, Missouri, North...

  20. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    Energy Technology Data Exchange (ETDEWEB)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow when filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.

  1. 76 FR 57757 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-09-16

    ...-47878A The applicant requests a permit to import biological specimens of African dwarf crocodiles (Osteolaemus tetraspis tetraspis) and slender snouted crocodiles (Crocodylus cataphractus) collected from...

  2. 76 FR 14424 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-03-16

    ... applicant requests a permit to take (survey by pursuit) the Quino checkerspot butterfly... pursuit) the Quino checkerspot butterfly (Euphydryasedithaquino) in conjunction with surveys throughout...

  3. 76 FR 63322 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2011-10-12

    ...), hawksbill (Eretmochelys imbricata), green (Chelonia mydas), and loggerhead (Caretta caretta) sea turtles.... Applicant requests a new permit for husbandry and holding of green (Chelonia mydas) sea turtles within...

  4. DUPIC facility engineering

    Energy Technology Data Exchange (ETDEWEB)

    Park, J. J.; Lee, H. H.; Kim, K. H. [and others

    2002-03-01

    With starting DUPIC fuel fabrication experiment by using spent fuels, 1) operation and refurbishment for DFDF (DUPIC fuel development facility), and 2) operation and improvement of transportation equipment for radioactive materials between facilities became the objectives of this study. This report describes objectives of the project, necessities, state of related technology, R and D scope, R and D results, proposal for application etc.

  5. Samarbejdsformer og Facilities Management

    DEFF Research Database (Denmark)

    Storgaard, Kresten

    Resultater fra en surveyundersøgelse om fordele og ulemper ved forskellige samarbejdsformer indenfor Facilities Management fremlægges.......Resultater fra en surveyundersøgelse om fordele og ulemper ved forskellige samarbejdsformer indenfor Facilities Management fremlægges....

  6. Japan Hadron Facility

    CERN Document Server

    Hayano, R S

    1999-01-01

    Japan Hadron Facility (JHF) is a high-intensity proton accelerator complex consisting of a 200 MeV linac, a 3 GeV booster and a 50 GeV main ring. Its status and future possibilities of realizing a versatile antiproton facility at JHF are presented.

  7. Samarbejdsformer og Facilities Management

    DEFF Research Database (Denmark)

    Storgaard, Kresten

    Resultater fra en surveyundersøgelse om fordele og ulemper ved forskellige samarbejdsformer indenfor Facilities Management fremlægges.......Resultater fra en surveyundersøgelse om fordele og ulemper ved forskellige samarbejdsformer indenfor Facilities Management fremlægges....

  8. BIBLIOGRAPHY OF FACILITIES INFORMATION.

    Science.gov (United States)

    American Association of Junior Colleges, Washington, DC.

    PERSONNEL OF THE FACILITIES INFORMATION SERVICE OF THE AMERICAN ASSOCIATION OF JUNIOR COLLEGES COMPILED THIS LISTING OF BOOKS, ARTICLES, MONOGRAPHS, AND OTHER PRINTED MATERIALS RELEVANT TO JUNIOR COLLEGE FACILITIES PLANNING, DESIGN, AND CONSTRUCTION. IN ADDITION TO A "GENERAL" CATEGORY, REFERENCES ARE GROUPED UNDER HEADINGS OF AUDITORIUMS, COLLEGE…

  9. Resource Conservation and Recovery Act (RCRA) Part B permit application for container storage units at the Oak Ridge Y-12 Plant

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This document contains Part B of the Permit Application for Container Storage Units at the Oak Ridge Y-12 Plant. Sections cover the following areas: Facility description; Waste characteristics; Process information; Ground water monitoring; Procedures to prevent hazards; Contingency plan; Personnel training; Closure plan, post closure plan, and financial requirements; Recordkeeping; Other federal laws; Organic air emissions; Solid waste management units; and Certification.

  10. Cogeneration : A Regulatory Guide to Leasing, Permitting, and Licensing in Idaho, Montana, Oregon, and Washington.

    Energy Technology Data Exchange (ETDEWEB)

    Deshaye, Joyce; Bloomquist, R.Gordon

    1992-12-01

    This guidebook focuses on cogeneration development. It is one of a series of four guidebooks recently prepared to introduce the energy developer to the federal, state and local agencies that regulate energy facilities in Idaho, Montana, Oregon, and Washington (the Bonneville Power Administration Service Territory). It was prepared specifically to help cogeneration developers obtain the permits, licenses and approvals necessary to construct and operate a cogeneration facility. The regulations, agencies and policies described herein are subject to change. Changes are likely to occur whenever energy or a project becomes a political issue, a state legislature meets, a preexisting popular or valuable land use is thought threatened, elected and appointed officials change, and new directions are imposed on states and local governments by the federal government. Accordingly, cogeneration developers should verify and continuously monitor the status of laws and rules that might affect their plans. Developers are cautioned that the regulations described herein may only be a starting point on the road to obtaining all the necessary permits.

  11. Cooperative Emissions Trading Game: International Permit Market Dominated by Buyers.

    Science.gov (United States)

    Honjo, Keita

    2015-01-01

    Rapid reduction of anthropogenic greenhouse gas emissions is required to mitigate disastrous impacts of climate change. The Kyoto Protocol introduced international emissions trading (IET) to accelerate the reduction of carbon dioxide (CO2) emissions. The IET controls CO2 emissions through the allocation of marketable emission permits to sovereign countries. The costs for acquiring additional permits provide buyers with an incentive to reduce their CO2 emissions. However, permit price has declined to a low level during the first commitment period (CP1). The downward trend in permit price is attributed to deficiencies of the Kyoto Protocol: weak compliance enforcement, the generous allocation of permits to transition economies (hot air), and the withdrawal of the US. These deficiencies created a buyer's market dominated by price-making buyers. In this paper, I develop a coalitional game of the IET, and demonstrate that permit buyers have dominant bargaining power. In my model, called cooperative emissions trading (CET) game, a buyer purchases permits from sellers only if the buyer forms a coalition with the sellers. Permit price is determined by bargaining among the coalition members. I evaluated the demand-side and supply-side bargaining power (DBP and SBP) using Shapley value, and obtained the following results: (1) Permit price is given by the product of the buyer's willingness-to-pay and the SBP (= 1 - DBP). (2) The DBP is greater than or equal to the SBP. These results indicate that buyers can suppress permit price to low levels through bargaining. The deficiencies of the Kyoto Protocol enhance the DBP, and contribute to the demand-side dominance in the international permit market.

  12. METC Combustion Research Facility

    Energy Technology Data Exchange (ETDEWEB)

    Halow, J.S.; Maloney, D.J.; Richards, G.A.

    1993-11-01

    The objective of the Morgantown Energy Technology Center (METC) high pressure combustion facility is to provide a mid-scale facility for combustion and cleanup research to support DOE`s advanced gas turbine, pressurized, fluidized-bed combustion, and hot gas cleanup programs. The facility is intended to fill a gap between lab scale facilities typical of universities and large scale combustion/turbine test facilities typical of turbine manufacturers. The facility is now available to industry and university partners through cooperative programs with METC. High pressure combustion research is also important to other DOE programs. Integrated gasification combined cycle (IGCC) systems and second-generation, pressurized, fluidized-bed combustion (PFBC) systems use gas turbines/electric generators as primary power generators. The turbine combustors play an important role in achieving high efficiency and low emissions in these novel systems. These systems use a coal-derived fuel gas as fuel for the turbine combustor. The METC facility is designed to support coal fuel gas-fired combustors as well as the natural gas fired combustor used in the advanced turbine program.

  13. DUPIC facility engineering

    Energy Technology Data Exchange (ETDEWEB)

    Lee, J. S.; Choi, J. W.; Go, W. I.; Kim, H. D.; Song, K. C.; Jeong, I. H.; Park, H. S.; Im, C. S.; Lee, H. M.; Moon, K. H.; Hong, K. P.; Lee, K. S.; Suh, K. S.; Kim, E. K.; Min, D. K.; Lee, J. C.; Chun, Y. B.; Paik, S. Y.; Lee, E. P.; Yoo, G. S.; Kim, Y. S.; Park, J. C.

    1997-09-01

    In the early stage of the project, a comprehensive survey was conducted to identify the feasibility of using available facilities and of interface between those facilities. It was found out that the shielded cell M6 interface between those facilities. It was found out that the shielded cell M6 of IMEF could be used for the main process experiments of DUPIC fuel fabrication in regard to space adequacy, material flow, equipment layout, etc. Based on such examination, a suitable adapter system for material transfer around the M6 cell was engineered. Regarding the PIEF facility, where spent PWR fuel assemblies are stored in an annex pool, disassembly devices in the pool are retrofitted and spent fuel rod cutting and shipping system to the IMEF are designed and built. For acquisition of casks for radioactive material transport between the facilities, some adaptive refurbishment was applied to the available cask (Padirac) based on extensive analysis on safety requirements. A mockup test facility was newly acquired for remote test of DUPIC fuel fabrication process equipment prior to installation in the M6 cell of the IMEF facility. (author). 157 refs., 57 tabs., 65 figs.

  14. Solid waste transuranic storage and assay facility indoor air sampling

    Energy Technology Data Exchange (ETDEWEB)

    Pingel, L.A., Westinghouse Hanford

    1996-08-20

    The purpose of the study is to collect and analyze samples of the indoor air at the Transuranic Storage and Assay Facility (TRUSAF), Westinghouse Hanford. A modified US EPA TO-14 methodology, using gas chromatography/mass spectrography, may be used for the collection and analysis of the samples. The information obtained will be used to estimate the total release of volatile organic compounds from TRUSAF to determine the need for air emmission permits.

  15. 48 CFR 52.247-2 - Permits, Authorities, or Franchises.

    Science.gov (United States)

    2010-10-01

    ... Franchises. 52.247-2 Section 52.247-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION....247-2 Permits, Authorities, or Franchises. As prescribed in 47.207-1(a), insert the following clause: Permits, Authorities, or Franchises (JAN 1997) (a) The offeror does □, does not □, hold authorization...

  16. 50 CFR 22.24 - Permits for falconry purposes.

    Science.gov (United States)

    2010-10-01

    ... government employee who has trapped a golden eagle under a Federal depredation permit or under a depredation... location. A golden eagle may only be taken from a livestock or wildlife depredation area declared by USDA Wildlife Services and permitted under § 22.23, or from a livestock depredation area authorized in...

  17. 75 FR 27814 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-05-18

    ... in the Zoological Society of San Diego's original permit. Applicant: George Carden Circus... education. The permit numbers and animals are: 070854, Bimbo Jr.; 079868, Vickie; 079870, Jenny; 079871... FR 9251). We made an error and neglected to report one species from which specimens would be...

  18. Waste Feed Delivery Environmental Permits and Approvals Plan

    Energy Technology Data Exchange (ETDEWEB)

    TOLLEFSON, K.S.

    2000-01-18

    This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches.

  19. 50 CFR 300.182 - HMS international trade permit.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false HMS international trade permit. 300.182... FISHERIES REGULATIONS International Trade Documentation and Tracking Programs for Highly Migratory Species § 300.182 HMS international trade permit. (a) General. An importer, entering for consumption fish or...

  20. 46 CFR 30.10-49 - Permit-TB/ALL.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Permit-TB/ALL. 30.10-49 Section 30.10-49 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS GENERAL PROVISIONS Definitions § 30.10-49 Permit—TB/ALL. The term permit refers to endorsement on the certificate of inspection, authorizing the presence...

  1. 75 FR 59711 - Audit Program for Texas Flexible Permit Holders

    Science.gov (United States)

    2010-09-28

    ... waiver of the gravity component of any penalties resulting from noncompliance uncovered by the Audit... on the Audit Program for Texas flexible permit holders, please contact Mr. John Jones, Air...). EPA is proposing the Audit Program as a mechanism for Texas Flexible Permit holders to transition...

  2. 76 FR 33334 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2011-06-08

    ... Fish and Wildlife Service Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and... receipt of applications to conduct certain activities pertaining to enhancement of survival of endangered species. The Endangered Species Act requires that we invite public comment on these permit...

  3. 75 FR 27361 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-05-14

    ... Fish and Wildlife Service Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and... receipt of applications to conduct certain activities pertaining to enhancement of survival of endangered species. The Endangered Species Act requires that we invite public comment on these permit...

  4. 76 FR 8374 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2011-02-14

    ... Fish and Wildlife Service Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and... receipt of applications to conduct certain activities pertaining to enhancement of survival of endangered species. The Endangered Species Act requires that we invite public comment on these permit...

  5. 75 FR 52012 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-08-24

    ... Fish and Wildlife Service Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and... receipt of applications to conduct certain activities pertaining to enhancement of survival of endangered species. The Endangered Species Act requires that we invite public comment on these permit...

  6. 76 FR 18576 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2011-04-04

    ... Fish and Wildlife Service Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and... receipt of applications to conduct certain activities pertaining to enhancement of survival of endangered species. The Endangered Species Act requires that we invite public comment on these permit...

  7. 76 FR 10063 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2011-02-23

    ... Fish and Wildlife Service Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and... receipt of applications to conduct certain activities pertaining to enhancement of survival of endangered species. The Endangered Species Act requires that we invite public comment on these permit...

  8. 75 FR 5101 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-02-01

    ... Fish and Wildlife Service Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and... receipt of applications to conduct certain activities pertaining to enhancement of survival of endangered species. The Endangered Species Act requires that we invite public comment on these permit...

  9. 50 CFR 15.22 - Permits for scientific research.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 1 2010-10-01 2010-10-01 false Permits for scientific research. 15.22... for scientific research. (a) Application requirements for permits for scientific research. Each... description of the scientific research to be conducted on the exotic bird requested, including: (i) Formal...

  10. 78 FR 20352 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2013-04-04

    ... Applicant: Bat Conservation International, Austin, Texas. Applicant requests a new permit for research and... (Dermochelys coriacea) Hawksbill (Eretmochelys imbricata) Permit TE-98704A Applicant: Dogs for Conservation... Houston toads (Bufo houstonensis) from the Houston Zoo for work with training dogs how to detect...

  11. 75 FR 427 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-01-05

    ... purpose of enhancement of the survival of the species. Applicant: Wildlife Conservation Society, Bronx Zoo... ADDRESSES. Applicant: Chelonian Conservation Center, Ojai, CA, PRT-217124 The applicant requests a permit to... period. Applicant: Metro Richmond Zoo, Moseley, VA, PRT-228022 The applicant requests a permit to...

  12. 46 CFR 78.40-10 - No smoking permitted.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false No smoking permitted. 78.40-10 Section 78.40-10 Shipping... § 78.40-10 No smoking permitted. (a) The master shall have appropriate “No Smoking” signs posted and shall take all necessary precautions to prevent smoking or carrying of lighted or smoldering...

  13. 76 FR 34095 - Endangered Species Receipt of Applications for Permit

    Science.gov (United States)

    2011-06-10

    ... permit to import biological samples from ring-tailed lemur (Lemur catta), collected in the wild in... the applicant over a 5-year period. Applicant: Duke Lemur Center, Duke University, Durham, NC; PRT-43685A The applicant requests a permit to import biological samples from mouse lemur species (Microcebus...

  14. 25 CFR 173.20 - Revocation of permits.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Revocation of permits. 173.20 Section 173.20 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER CONCESSIONS, PERMITS AND LEASES ON LANDS WITHDRAWN OR ACQUIRED IN CONNECTION WITH INDIAN IRRIGATION PROJECTS § 173.20 Revocation of...

  15. 36 CFR 20.4 - Revocation of permits; appeal.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Revocation of permits; appeal. 20.4 Section 20.4 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR ISLE ROYALE NATIONAL PARK; COMMERCIAL FISHING § 20.4 Revocation of permits; appeal. The...

  16. 76 FR 67650 - Migratory Bird Permits; Abatement Regulations

    Science.gov (United States)

    2011-11-02

    ... for a specific permit authorizing the use of raptors in abatement activities (76 FR 39368). The... the advance notice of proposed rulemaking, please refer to that document at 76 FR 39368 (July 6, 2011... Fish and Wildlife Service 50 CFR Part 21 RIN 1018-AW75 Migratory Bird Permits; Abatement...

  17. 25 CFR 163.26 - Forest product harvesting permits.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Forest product harvesting permits. 163.26 Section 163.26... Forest Management and Operations § 163.26 Forest product harvesting permits. (a) Except as provided in §§ 163.13 and 163.27 of this part, removal of forest products that are not under formal...

  18. 76 FR 7577 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2011-02-10

    ...--Sonora Desert Museum, Tucson, Arizona. Applicant requests an amendment to a current permit for research... topminnow (Poeciliopsis occidentalis sonoriensis) at the museum. Permit TE-31412A Applicant: John Kuba... recovery purposes to conduct presence/absence surveys for the following species: Texas blind...

  19. 19 CFR 12.104c - Importations permitted.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false Importations permitted. 12.104c Section 12.104c Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY SPECIAL CLASSES OF MERCHANDISE Cultural Property § 12.104c Importations permitted....

  20. 76 FR 27307 - Marine Mammals; Photography Permit Application No. 16360

    Science.gov (United States)

    2011-05-11

    ... National Oceanic and Atmospheric Administration RIN 0648-XA426 Marine Mammals; Photography Permit..., Auckland, New Zealand has applied in due form for a permit to conduct commercial/educational photography of... for photography for educational or commercial purposes involving non-endangered and...

  1. 76 FR 40338 - Marine Mammals; Photography Permit No. 16360

    Science.gov (United States)

    2011-07-08

    ... National Oceanic and Atmospheric Administration Marine Mammals; Photography Permit No. 16360 AGENCY..., Auckland, New Zealand to conduct commercial/educational photography of cetaceans off Hawaii. ADDRESSES: The... request for a permit to conduct commercial/educational photography on 12 cetacean species had...

  2. 77 FR 2037 - Marine Mammals; Photography Permit File No. 17032

    Science.gov (United States)

    2012-01-13

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration RIN 0648-XA929 Marine Mammals; Photography Permit File No... for a permit to conduct commercial or educational photography on killer (Orcinus orca) and...

  3. 77 FR 49483 - Actions on Special Permit Applications

    Science.gov (United States)

    2012-08-16

    ... liters (11888 USWG) max. 11458-M Costco Wholesale, 49 CFR 172.203(a) and To modify the special permit.... 11836-M Hydrite Chemical Co., 49 CFR 173.24; 173.203.. To modify the special permit Brookfield, WI. by... 173.159 To authorize the Group, Inc., Milwaukee, transportation in commerce WI. of certain...

  4. 9 CFR 82.23 - Issuance of permits.

    Science.gov (United States)

    2010-01-01

    ... poultry, vehicles, cages, coops, containers, troughs, or other equipment or material if the interstate... INTERSTATE TRANSPORTATION OF ANIMALS (INCLUDING POULTRY) AND ANIMAL PRODUCTS EXOTIC NEWCASTLE DIS- EASE (END) AND CHLAMYDIOSIS Chlamydiosis in Poultry § 82.23 Issuance of permits. (a) Application for the permit...

  5. 77 FR 31044 - Permits Issued Under the Antarctic Conservation Act

    Science.gov (United States)

    2012-05-24

    ... No: 2012-12616] NATIONAL SCIENCE FOUNDATION Permits Issued Under the Antarctic Conservation Act AGENCY: National Science Foundation. ACTION: Notice of permits issued under the Antarctic Conservation of 1978, Public Law 95-541. SUMMARY: The National Science Foundation (NSF) is required to publish...

  6. 78 FR 37840 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-06-24

    ... applicant requests a permit to take (survey by pursuit) the Quino checkerspot butterfly (Euphydryas editha quino) in conjunction with surveys throughout the range of the species in California for the purpose of... applicant requests a permit to take (survey by pursuit) the Quino checkerspot butterfly (Euphydryas editha...

  7. 76 FR 50751 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-08-16

    ..., San Diego, California The applicant requests a permit to take (survey by pursuit) the Quino checkerspot butterfly (Euphydryas editha quino) and take (capture, collect, and kill) the Conservancy fairy... Gadsby, Encinitas, California The applicant requests a permit to take (survey by pursuit) the Quino...

  8. 77 FR 54604 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2012-09-05

    ... applicant requests a permit to export sport hunted trophies of one male addax (Addax nasomaculatus), one.... Applicant: John Fry, Carson City, NV; PRT-82592A The applicant requests a permit to import a sport-hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled from a captive herd maintained...

  9. 75 FR 38117 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-07-01

    ...-hunted trophy of one female scimitar-horned oryx (Oryx dammah) taken in the Republic of South Africa, for...; PRT-10400A The applicant requests a permit to import the sport-hunted trophy of one male scimitar... permit to import a sport-hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled from...

  10. 29 CFR 2.12 - Audiovisual coverage permitted.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Audiovisual coverage permitted. 2.12 Section 2.12 Labor Office of the Secretary of Labor GENERAL REGULATIONS Audiovisual Coverage of Administrative Hearings § 2.12 Audiovisual coverage permitted. The following are the types of hearings where the...

  11. Permitted Suicide: Model Roles for Mental Health Counseling.

    Science.gov (United States)

    Cohen, Elliot D.

    2001-01-01

    In mental health practice, no explicit provisions have been made for existing law and codes of ethics to protect freedom and confidences of clients who rationally desire to end their lives. Makes a case for permitting suicide by providing an analysis of permitted suicide, the legal background for applying this concept, and ten model rules for…

  12. Wind Energy Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Laurie, Carol

    2017-02-01

    This book takes readers inside the places where daily discoveries shape the next generation of wind power systems. Energy Department laboratory facilities span the United States and offer wind research capabilities to meet industry needs. The facilities described in this book make it possible for industry players to increase reliability, improve efficiency, and reduce the cost of wind energy -- one discovery at a time. Whether you require blade testing or resource characterization, grid integration or high-performance computing, Department of Energy laboratory facilities offer a variety of capabilities to meet your wind research needs.

  13. Sustainable Facilities Management

    DEFF Research Database (Denmark)

    Nielsen, Susanne Balslev; Elle, Morten; Hoffmann, Birgitte

    2004-01-01

    The Danish public housing sector has more than 20 years of experience with sustainable facilities management based on user involvement. The paper outlines this development in a historical perspective and gives an analysis of different approaches to sustainable facilities management. The focus...... is on the housing departments and strateies for the management of the use of resources. The research methods used are case studies based on interviews in addition to literature studies. The paper explores lessons to be learned about sustainable facilities management in general, and points to a need for new...

  14. Wind Energy Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Office of Energy Efficiency and Renewable Energy

    2017-02-01

    This book takes readers inside the places where daily discoveries shape the next generation of wind power systems. Energy Department laboratory facilities span the United States and offer wind research capabilities to meet industry needs. The facilities described in this book make it possible for industry players to increase reliability, improve efficiency, and reduce the cost of wind energy -- one discovery at a time. Whether you require blade testing or resource characterization, grid integration or high-performance computing, Department of Energy laboratory facilities offer a variety of capabilities to meet your wind research needs.

  15. Battelle Primate Facility.

    Science.gov (United States)

    Weller, R E; Wierman, E L; Málaga, C A; Baer, J F; LeMieux, T P

    1991-05-01

    The Battelle Primate Facility houses one of the largest collections of neotropical primates in the United States. The facility is a research resource for undergraduate and graduate students. Battelle staff, as well as staff and faculty from U.S. and international institutions. Researchers have access to the animals for a variety of studies encompassing several disciplines, a large collection of preserved tissues, and an extensive biomedical database. The facility is a World Health Organization Collaborative Center for Clinical Pathology of Neotropical Primates and is involved with the Peruvian Primatological Project in Iquitos, Peru, which provides opportunities for research in primatology and conservation.

  16. Gas cooled fast breeder reactor design for a circulator test facility (modified HTGR circulator test facility)

    Energy Technology Data Exchange (ETDEWEB)

    1979-10-01

    A GCFR helium circulator test facility sized for full design conditions is proposed for meeting the above requirements. The circulator will be mounted in a large vessel containing high pressure helium which will permit testing at the same power, speed, pressure, temperature and flow conditions intended in the demonstration plant. The electric drive motor for the circulator will obtain its power from an electric supply and distribution system in which electric power will be taken from a local utility. The conceptual design decribed in this report is the result of close interaction between the General Atomic Company (GA), designer of the GCFR, and The Ralph M. Parson Company, architect/engineer for the test facility. A realistic estimate of total project cost is presented, together with a schedule for design, procurement, construction, and inspection.

  17. Qualitative identification of permitted and non-permitted color additives in cosmetics.

    Science.gov (United States)

    Miranda-Bermudez, Enio; Harp, Bhakti Petigara; Barrows, Julie N

    2014-01-01

    Color additives are dyes, pigments, or other substances that can impart color when added or applied to foods, drugs, cosmetics, medical devices, or the human body. These substances must be pre-approved by the U.S. Food and Drug Administration (FDA) and listed in the Code of Federal Regulations before they may be used in FDA-regulated products. Both domestic and imported cosmetic products sold in interstate commerce fall under FDA jurisdiction, and FDA's district laboratories use a combination of analytical methods for identifying or confirming the presence of potentially violative color additives. We have developed a qualitative method for identifying 29 water- and methanol-soluble color additives in various types of cosmetic products. The color additives are extracted with combinations of methylene chloride, methanol, acetic acid, and water and are identified by LC with photodiode array detection. Estimated LOD values ranged from 0.1 to 1.5 mg/L. A survey of lip products, nail polishes, eye products, blushes, body glitter, face paints, bath products, creams, and toothpastes identified permitted and non-permitted color additives. Our new LC method is intended to supplement the visible spectrophotometry and TLC methods currently used by FDA's district laboratories and will help optimize the use of time, labor, and solvents.

  18. National Solar Thermal Test Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The National Solar Thermal Test Facility (NSTTF) is the only test facility in the United States of its type. This unique facility provides experimental engineering...

  19. Skilled nursing or rehabilitation facilities

    Science.gov (United States)

    ... page: //medlineplus.gov/ency/patientinstructions/000435.htm Skilled nursing or rehabilitation facilities To use the sharing features ... facility. Who Needs to go to a Skilled Nursing or Rehabilitation Facility? Your health care provider may ...

  20. National Solar Thermal Test Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The National Solar Thermal Test Facility (NSTTF) is the only test facility in the United States of its type. This unique facility provides experimental engineering...

  1. Hydrography - Water Pollution Control Facilities

    Data.gov (United States)

    NSGIC GIS Inventory (aka Ramona) — A Water Pollution Control Facility is a DEP primary facility type related to the Water Pollution Control Program. The sub-facility types related to Water Pollution...

  2. Wind Tunnel Testing Facilities

    Data.gov (United States)

    Federal Laboratory Consortium — NASA Ames Research Center is pleased to offer the services of our premier wind tunnel facilities that have a broad range of proven testing capabilities to customers...

  3. Coastal Inlet Model Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Coastal Inlet Model Facility, as part of the Coastal Inlets Research Program (CIRP), is an idealized inlet dedicated to the study of coastal inlets and equipped...

  4. The Birmingham Irradiation Facility

    Science.gov (United States)

    Dervan, P.; French, R.; Hodgson, P.; Marin-Reyes, H.; Wilson, J.

    2013-12-01

    At the end of 2012 the proton irradiation facility at the CERN PS [1] will shut down for two years. With this in mind, we have been developing a new ATLAS scanning facility at the University of Birmingham Medical Physics cyclotron. With proton beams of energy approximately 30 MeV, fluences corresponding to those of the upgraded Large Hadron Collider (HL-LHC) can be reached conveniently. The facility can be used to irradiate silicon sensors, optical components and mechanical structures (e.g. carbon fibre sandwiches) for the LHC upgrade programme. Irradiations of silicon sensors can be carried out in a temperature controlled cold box that can be scanned through the beam. The facility is described in detail along with the first tests carried out with mini (1×1 cm2) silicon sensors.

  5. Hypersonic Tunnel Facility (HTF)

    Data.gov (United States)

    Federal Laboratory Consortium — The Hypersonic Tunnel Facility (HTF) is a blow-down, non-vitiated (clean air) free-jet wind tunnel capable of testing large-scale, propulsion systems at Mach 5, 6,...

  6. A cryogenic test facility

    Science.gov (United States)

    Veenendaal, Ian

    The next generation, space-borne instruments for far infrared spectroscopy will utilize large diameter, cryogenically cooled telescopes in order to achieve unprecedented sensitivities. Low background, ground-based cryogenic facilities are required for the cryogenic testing of materials, components and subsystems. The Test Facility Cryostat (TFC) at the University of Lethbridge is a large volume, closed cycle, 4K cryogenic facility, developed for this purpose. This thesis discusses the design and performance of the facility and associated external instrumentation. An apparatus for measuring the thermal properties of materials is presented, and measurements of the thermal expansion and conductivity of carbon fibre reinforced polymers (CFRPs) at cryogenic temperatures are reported. Finally, I discuss the progress towards the design and fabrication of a demonstrator cryogenic, far infrared Fourier transform spectrometer.

  7. Treated Effluent Disposal Facility

    Data.gov (United States)

    Federal Laboratory Consortium — Treated non-hazardous and non-radioactive liquid wastes are collected and then disposed of through the systems at the Treated Effluent Disposal Facility (TEDF). More...

  8. Aviation Flight Support Facility

    Data.gov (United States)

    Federal Laboratory Consortium — This facility consists of a 75' x 200' hanger with two adjacent helicopter pads located at Felker Army Airfield on Fort Eustis. A staff of Government and contractor...

  9. Space Power Facility (SPF)

    Data.gov (United States)

    Federal Laboratory Consortium — The Space Power Facility (SPF) houses the world's largest space environment simulation chamber, measuring 100 ft. in diameter by 122 ft. high. In this chamber, large...

  10. GPS Satellite Simulation Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The GPS satellite simulation facility consists of a GPS satellite simulator controlled by either a Silicon Graphics Origin 2000 or PC depending upon unit under test...

  11. Robotics Research Facility

    Data.gov (United States)

    Federal Laboratory Consortium — This 60 feet x 100 feet structure on the grounds of the Fort Indiantown Gap Pennsylvania National Guard (PNG) Base is a mixed-use facility comprising office space,...

  12. Airborne Evaluation Facility

    Data.gov (United States)

    Federal Laboratory Consortium — AFRL's Airborne Evaluation Facility (AEF) utilizes Air Force Aero Club resources to conduct test and evaluation of a variety of equipment and concepts. Twin engine...

  13. Geophysical Research Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Geophysical Research Facility (GRF) is a 60 ft long × 22 ft wide × 7 ft deep concrete basin at CRREL for fresh or saltwater investigations and can be temperature...

  14. Climatic Environmental Test Facilities

    Data.gov (United States)

    Federal Laboratory Consortium — RTTC has an extensive suite of facilities for supporting MIL-STD-810 testing, toinclude: Temperature/Altitude, Rapid Decompression, Low/High Temperature,Temperature...

  15. IHS Facility Locator

    Data.gov (United States)

    U.S. Department of Health & Human Services — This map can be used to find an Indian Health Service, Tribal or Urban Indian Health Program facility. This map can be used to: Zoom in to a general location to...

  16. Environmental Test Facility (ETF)

    Data.gov (United States)

    Federal Laboratory Consortium — The Environmental Test Facility (ETF) provides non-isolated shock testing for stand-alone equipment and full size cabinets under MIL-S-901D specifications. The ETF...

  17. Air Data Calibration Facility

    Data.gov (United States)

    Federal Laboratory Consortium — This facility is for low altitude subsonic altimeter system calibrations of air vehicles. Mission is a direct support of the AFFTC mission. Postflight data merge is...

  18. Mass Properties Facility

    Data.gov (United States)

    Federal Laboratory Consortium — This facility is used to acquire accurate weight, 3 axis center of gravity and 3 axis moment of inertia measurements for air launched munitions and armament equipment.

  19. Airborne & Field Sensors Facilities

    Data.gov (United States)

    Federal Laboratory Consortium — RTTC facilities include an 800' x 60' paved UAV operational area, clearapproach/departure zone, concrete pads furnished with 208VAC, 3 phase,200 amp power, 20,000 sq...

  20. Frost Effects Research Facility

    Data.gov (United States)

    Federal Laboratory Consortium — Full-scale study in controlled conditionsThe Frost Effects Research Facility (FERF) is the largest refrigerated warehouse in the United States that can be used for a...

  1. Concrete Research Facility

    Data.gov (United States)

    Federal Laboratory Consortium — This is a 20,000-sq ft laboratory that supports research on all aspects of concrete and materials technology. The staff of this facility offer wide-ranging expertise...

  2. Water Tunnel Facility

    Data.gov (United States)

    Federal Laboratory Consortium — NETL’s High-Pressure Water Tunnel Facility in Pittsburgh, PA, re-creates the conditions found 3,000 meters beneath the ocean’s surface, allowing scientists to study...

  3. Structural Test Facility

    Data.gov (United States)

    Federal Laboratory Consortium — Provides a wide variety of testing equipment, fixtures and facilities to perform both unique aviation component testing as well as common types of materials testing...

  4. Structural Test Facility

    Data.gov (United States)

    Federal Laboratory Consortium — Provides a wide variety of testing equipment, fixtures and facilities to perform both unique aviation component testing as well as common types of materials testing...

  5. Robotics Research Facility

    Data.gov (United States)

    Federal Laboratory Consortium — This 60 feet x 100 feet structure on the grounds of the Fort Indiantown Gap Pennsylvania National Guard (PNG) Base is a mixed-use facility comprising office space,...

  6. Urban Test Facilities

    Data.gov (United States)

    Federal Laboratory Consortium — RTTC has access to various facilities for use in urban testing applications,including an agreement with the Hazardous Devices School (HDS): a restrictedaccess Urban...

  7. Wind Tunnel Facility

    Data.gov (United States)

    Federal Laboratory Consortium — This ARDEC facility consists of subsonic, transonic, and supersonic wind tunnels to acquire aerodynamic data. Full-scale and sub-scale models of munitions are fitted...

  8. Pittsburgh City Facilities

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Pittsburgh City FacilitiesIncludes: City Administrative Buildings, Police Stations, Fire Stations, EMS Stations, DPW Sites, Senior Centers, Recreation Centers, Pool...

  9. Dialysis Facility Compare Data

    Data.gov (United States)

    U.S. Department of Health & Human Services — These are the official datasets used on the Medicare.gov Dialysis Facility Compare Website provided by the Centers for Medicare and Medicaid Services. These data...

  10. Pittsburgh City Facilities

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Pittsburgh City FacilitiesIncludes: City Administrative Buildings, Police Stations, Fire Stations, EMS Stations, DPW Sites, Senior Centers, Recreation Centers,...

  11. Advanced Microscopy Facility

    Data.gov (United States)

    Federal Laboratory Consortium — FUNCTION: Provides a facility for high-resolution studies of complex biomolecular systems. The goal is an understanding of how to engineer biomolecules for various...

  12. VT Telecommunication Facilities

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The UtilityTelecom_TELEFAC data layer contains points which are intended to represent the location of telecommunications facilities (towers and/or...

  13. Waste Water Facilities

    Data.gov (United States)

    Vermont Center for Geographic Information — This dataset contains the locations of municipal and industrial direct discharge wastewater treatment facilities throughout the state of Vermont. Spatial data is not...

  14. FDA Certified Mammography Facilities

    Science.gov (United States)

    ... Products Radiation-Emitting Products Home Radiation-Emitting Products Mammography Quality Standards Act and Program Consumer Information (MQSA) ... it Email Print This list of FDA Certified Mammography Facilities is updated weekly. If you click on ...

  15. Mark 1 Test Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Mark I Test Facility is a state-of-the-art space environment simulation test chamber for full-scale space systems testing. A $1.5M dollar upgrade in fiscal year...

  16. The Birmingham Irradiation Facility

    CERN Document Server

    Dervan, P; Hodgson, P; Marin-Reyes, H; Wilson, J

    2013-01-01

    At the end of 2012 the proton irradiation facility at the CERN PS [1] will shut down for two years. With this in mind, we have been developing a new ATLAS scanning facility at the University of Birmingham Medical Physics cyclotron. With proton beams of energy approximately 30 MeV, fluences corresponding to those of the upgraded Large Hadron Collider (HL-LHC) can be reached conveniently. The facility can be used to irradiate silicon sensors, optical components and mechanical structures (e.g. carbon fibre sandwiches) for the LHC upgrade programme. Irradiations of silicon sensors can be carried out in a temperature controlled cold box that can be scanned through the beam. The facility is described in detail along with the first tests carried out with mini (1 x 1 cm^2 ) silicon sensors.

  17. TNO HVAC facilities

    NARCIS (Netherlands)

    Hammink, H.A.J.

    2015-01-01

    TNO has extensive knowledge of heating, ventilation and air conditioning (HVAC), and can offer its services through theoretical studies, laboratory experiments and field measurements. This complete scope, made possible through our test facilities, enables the effective development of new products,

  18. Ballistic Test Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Ballistic Test Facility is comprised of two outdoor and one indoor test ranges, which are all instrumented for data acquisition and analysis. Full-size aircraft...

  19. Advanced Microanalysis Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Advanced Microanalysis Facility fully integrates capabilities for chemical and structural analysis of electronic materials and devices for the U.S. Army and DoD....

  20. Coastal Harbors Modeling Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Coastal Harbors Modeling Facility is used to aid in the planning of harbor development and in the design and layout of breakwaters, absorbers, etc.. The goal is...

  1. Corrosion Testing Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Corrosion Testing Facility is part of the Army Corrosion Office (ACO). It is a fully functional atmospheric exposure site, called the Corrosion Instrumented Test...

  2. Joint Computing Facility

    Data.gov (United States)

    Federal Laboratory Consortium — Raised Floor Computer Space for High Performance ComputingThe ERDC Information Technology Laboratory (ITL) provides a robust system of IT facilities to develop and...

  3. Skilled Nursing Facility PPS

    Data.gov (United States)

    U.S. Department of Health & Human Services — Section 4432(a) of the Balanced Budget Act (BBA) of 1997 modified how payment is made for Medicare skilled nursing facility (SNF) services. Effective with cost...

  4. Frost Effects Research Facility

    Data.gov (United States)

    Federal Laboratory Consortium — Full-scale study in controlled conditions The Frost Effects Research Facility (FERF) is the largest refrigerated warehouse in the United States that can be used for...

  5. Electra Laser Facility

    Data.gov (United States)

    Federal Laboratory Consortium — FUNCTION: The Electra Laser Facility is used to develop the science and technology needed to develop a reliable, efficient, high-energy, repetitively pulsed krypton...

  6. Hypersonic Tunnel Facility (HTF)

    Data.gov (United States)

    Federal Laboratory Consortium — The Hypersonic Tunnel Facility (HTF) is a blow-down, non-vitiated (clean air) free-jet wind tunnel capable of testing large-scale, propulsion systems at Mach 5, 6,...

  7. Pit Fragment Facility

    Data.gov (United States)

    Federal Laboratory Consortium — This facility contains two large (20 foot high by 20 foot diameter) double walled steel tubs in which experimental munitions are exploded while covered with sawdust....

  8. Powder Metallurgy Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The facility is uniquely equipped as the only laboratory within DA to conduct PM processing of refractory metals and alloys as well as the processing of a wide range...

  9. Field Research Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Field Research Facility (FRF) located in Duck, N.C. was established in 1977 to support the U.S. Army Corps of Engineers' coastal engineering mission. The FRF is...

  10. Advanced Microanalysis Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Advanced Microanalysis Facility fully integrates capabilities for chemical and structural analysis of electronic materials and devices for the U.S. Army and DoD....

  11. Laser Guidance Analysis Facility

    Data.gov (United States)

    Federal Laboratory Consortium — This facility, which provides for real time, closed loop evaluation of semi-active laser guidance hardware, has and continues to be instrumental in the development...

  12. Combustion Research Facility

    Data.gov (United States)

    Federal Laboratory Consortium — For more than 30 years The Combustion Research Facility (CRF) has served as a national and international leader in combustion science and technology. The need for a...

  13. 2011 Annual Wastewater Reuse Report for the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Michael G. Lewis

    2012-02-01

    This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (LA-000141-03), for the wastewater land application site at Idaho National Laboratory Site's Central Facilities Area Sewage Treatment Plant from November 1, 2010, through October 31, 2011. The report contains the following information: (1) Site description; (2) Facility and system description; (3) Permit required monitoring data and loading rates; (4) Status of special compliance conditions and activities; and (5) Discussion of the facility's environmental impacts. During the 2011 permit year, approximately 1.22 million gallons of treated wastewater was land-applied to the irrigation area at Central Facilities Area Sewage Treatment plant.

  14. Calibration Facilities for NIF

    Energy Technology Data Exchange (ETDEWEB)

    Perry, T.S.

    2000-06-15

    The calibration facilities will be dynamic and will change to meet the needs of experiments. Small sources, such as the Manson Source should be available to everyone at any time. Carrying out experiments at Omega is providing ample opportunity for practice in pre-shot preparation. Hopefully, the needs that are demonstrated in these experiments will assure the development of (or keep in service) facilities at each of the laboratories that will be essential for in-house preparation for experiments at NIF.

  15. Auditing radiation sterilization facilities

    Science.gov (United States)

    Beck, Jeffrey A.

    The diversity of radiation sterilization systems available today places renewed emphasis on the need for thorough Quality Assurance audits of these facilities. Evaluating compliance with Good Manufacturing Practices is an obvious requirement, but an effective audit must also evaluate installation and performance qualification programs (validation_, and process control and monitoring procedures in detail. The present paper describes general standards that radiation sterilization operations should meet in each of these key areas, and provides basic guidance for conducting QA audits of these facilities.

  16. 77 FR 13601 - Notice of Proposed NPDES General Permit; Proposed NPDES General Permit for New and Existing...

    Science.gov (United States)

    2012-03-07

    ... discharging to the Outer Continental Shelf offshore of Louisiana and Texas. The discharge of produced water to... study to obtain more representative data to evaluate impacts to water quality. Marine Protection... territorial seas of Louisiana and Texas is also authorized by this permit. This draft permit proposes...

  17. 75 FR 75463 - Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Luke Paper...

    Science.gov (United States)

    2010-12-03

    ... From the Federal Register Online via the Government Publishing Office ENVIROMENTAL PROTECTION AGENCY Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Luke Paper... issues during the comment period or that the grounds for objection or other issue arose after the comment...

  18. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues...

  19. Mound facility physical characterization

    Energy Technology Data Exchange (ETDEWEB)

    Tonne, W.R.; Alexander, B.M.; Cage, M.R.; Hase, E.H.; Schmidt, M.J.; Schneider, J.E.; Slusher, W.; Todd, J.E.

    1993-12-01

    The purpose of this report is to provide a baseline physical characterization of Mound`s facilities as of September 1993. The baseline characterizations are to be used in the development of long-term future use strategy development for the Mound site. This document describes the current missions and alternative future use scenarios for each building. Current mission descriptions cover facility capabilities, physical resources required to support operations, current safety envelope and current status of facilities. Future use scenarios identify potential alternative future uses, facility modifications required for likely use, facility modifications of other uses, changes to safety envelope for the likely use, cleanup criteria for each future use scenario, and disposition of surplus equipment. This Introductory Chapter includes an Executive Summary that contains narrative on the Functional Unit Material Condition, Current Facility Status, Listing of Buildings, Space Plans, Summary of Maintenance Program and Repair Backlog, Environmental Restoration, and Decontamination and Decommissioning Programs. Under Section B, Site Description, is a brief listing of the Site PS Development, as well as Current Utility Sources. Section C contains Site Assumptions. A Maintenance Program Overview, as well as Current Deficiencies, is contained within the Maintenance Program Chapter.

  20. Alternative energy facility siting policies for urban coastal areas: executive summary of findings and policy recommendations

    Energy Technology Data Exchange (ETDEWEB)

    Morell, D; Singer, G

    1980-11-01

    An analysis was made of siting issues in the coastal zone, one of the nation's most critical natural resource areas and one which is often the target for energy development proposals. The analysis addressed the changing perceptions of citizens toward energy development in the coastal zone, emphasizing urban communities where access to the waterfront and revitalization of waterfront property are of interest to the citizen. The findings of this analysis are based on an examination of energy development along New Jersey's urban waterfront and along the Texas-Louisiana Gulf Coast, and on redevelopment efforts in Seattle, San Francisco, Boston, and elsewhere. The case studies demonstrate the significance of local attitudes and regional cooperation in the siting process. In highly urbanized areas, air quality has become a predominant concern among citizen groups and an influential factor in development of alternative energy facility siting strategies, such as consideration of inland siting connected by pipeline to a smaller coastal facility. The study addresses the economic impact of the permitting process on the desirability of energy facility investments, and the possible effects of the location selected for the facility on the permitting process and investment economics. The economic analysis demonstrates the importance of viewing energy facility investments in a broad perspective that includes the positive or negative impacts of various alternative siting patterns on the permitting process. Conclusions drawn from the studies regarding Federal, state, local, and corporate politics; regulatory, permitting, licensing, environmental assessment, and site selection are summarized. (MCW)

  1. Distributed Energy Resources Test Facility

    Data.gov (United States)

    Federal Laboratory Consortium — NREL's Distributed Energy Resources Test Facility (DERTF) is a working laboratory for interconnection and systems integration testing. This state-of-the-art facility...

  2. Distributed Energy Resources Test Facility

    Data.gov (United States)

    Federal Laboratory Consortium — NREL's Distributed Energy Resources Test Facility (DERTF) is a working laboratory for interconnection and systems integration testing. This state-of-the-art facility...

  3. ENVIRONMENTALLY SOUND DISPOSAL OF RADIOACTIVE MATERIALS AT A RCRA HAZARDOUS WASTE DISPOSAL FACILITY

    Energy Technology Data Exchange (ETDEWEB)

    Romano, Stephen; Welling, Steven; Bell, Simon

    2003-02-27

    The use of hazardous waste disposal facilities permitted under the Resource Conservation and Recovery Act (''RCRA'') to dispose of low concentration and exempt radioactive materials is a cost-effective option for government and industry waste generators. The hazardous and PCB waste disposal facility operated by US Ecology Idaho, Inc. near Grand View, Idaho provides environmentally sound disposal services to both government and private industry waste generators. The Idaho facility is a major recipient of U.S. Army Corps of Engineers FUSRAP program waste and received permit approval to receive an expanded range of radioactive materials in 2001. The site has disposed of more than 300,000 tons of radioactive materials from the federal government during the past five years. This paper presents the capabilities of the Grand View, Idaho hazardous waste facility to accept radioactive materials, site-specific acceptance criteria and performance assessment, radiological safety and environmental monitoring program information.

  4. Facility Environmental Vulnerability Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Van Hoesen, S.D.

    2001-07-09

    From mid-April through the end of June 2001, a Facility Environmental Vulnerability Assessment (FEVA) was performed at Oak Ridge National Laboratory (ORNL). The primary goal of this FEVA was to establish an environmental vulnerability baseline at ORNL that could be used to support the Laboratory planning process and place environmental vulnerabilities in perspective. The information developed during the FEVA was intended to provide the basis for management to initiate immediate, near-term, and long-term actions to respond to the identified vulnerabilities. It was expected that further evaluation of the vulnerabilities identified during the FEVA could be carried out to support a more quantitative characterization of the sources, evaluation of contaminant pathways, and definition of risks. The FEVA was modeled after the Battelle-supported response to the problems identified at the High Flux Beam Reactor at Brookhaven National Laboratory. This FEVA report satisfies Corrective Action 3A1 contained in the Corrective Action Plan in Response to Independent Review of the High Flux Isotope Reactor Tritium Leak at the Oak Ridge National Laboratory, submitted to the Department of Energy (DOE) ORNL Site Office Manager on April 16, 2001. This assessment successfully achieved its primary goal as defined by Laboratory management. The assessment team was able to develop information about sources and pathway analyses although the following factors impacted the team's ability to provide additional quantitative information: the complexity and scope of the facilities, infrastructure, and programs; the significantly degraded physical condition of the facilities and infrastructure; the large number of known environmental vulnerabilities; the scope of legacy contamination issues [not currently addressed in the Environmental Management (EM) Program]; the lack of facility process and environmental pathway analysis performed by the accountable line management or facility owner; and

  5. Political and Economic Scope for Permit Markets in Europe

    DEFF Research Database (Denmark)

    Svendsen, Gert Tinggaard

    1999-01-01

    (organized polluters) due to the possibility of a free, initial distribution (grand-fathering). As such, a mix of green taxes (in relation to non-organized interests) and grandfathered permit markets (in relation to organized interests) should be considered in the search for cost-effective and politically...... of permit markets in the US. Therefore, the policy recommendation for e.g. CO2 reduction in Europe is to apply taxation in relation to large and non-organized groups only, such as households and the transportation sector. A permit market, on the other hand, is politically more attrac-tive to the industry...

  6. Political and Economic Scope for Permit Markets in Europe

    DEFF Research Database (Denmark)

    Svendsen, Gert Tinggaard

    1999-01-01

    (organized polluters) due to the possibility of a free, initial distribution (grand-fathering). As such, a mix of green taxes (in relation to non-organized interests) and grandfathered permit markets (in relation to organized interests) should be considered in the search for cost-effective and politically...... of permit markets in the US. Therefore, the policy recommendation for e.g. CO2 reduction in Europe is to apply taxation in relation to large and non-organized groups only, such as households and the transportation sector. A permit market, on the other hand, is politically more attrac-tive to the industry...

  7. Comprehensive facilities plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitate existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.

  8. 46 CFR 115.204 - Permit to carry excursion party.

    Science.gov (United States)

    2010-10-01

    ... issued an excursion permit will normally be required to meet the minimum stability, survival craft, life jacket, fire safety, and manning standards applicable to a vessel in the service for which the excursion...

  9. 50 CFR 21.30 - Raptor propagation permits.

    Science.gov (United States)

    2010-10-01

    ... entirely enclosed with wood, wire netting, or other suitable material which provides a safe, health... sport of falconry only if such use is designated in both the propagation permit and the permittee's...

  10. 75 FR 82409 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2010-12-30

    ..., reproductive physiology, genetics, nutrition, and animal health and is a continuation of activities currently.... Applicant: Reggie Pratt, Minot, ME; PRT-30840A. The applicant requests a permit to import a sport-hunted...

  11. 75 FR 34766 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-06-18

    ... Agriculture/Animal and Plant Health Inspection Service/Wildlife Service/ National Wildlife Research Center... following applicants each request a permit to import the sport- hunted trophy of one male bontebok...

  12. 75 FR 14627 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-03-26

    ... permit to import a female cheetah (Acrinonyx jubatus) from DeWildt Cheetah Breeding Centre, South Africa where the individual cheetah was captive bred for the purpose of enhancement of the survival of the...

  13. 2016: Special Use Permits : Rocky Mountain Arsenal NWR Complex

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This reference is a collection of Special Use Permits originating from the Rocky Mountain Arsenal NWR Complex. The Complex consists of Rocky Mountain Arsenal NWR,...

  14. 78 FR 57650 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-09-19

    ..., Arizona, New Mexico, Texas, Utah, and Colorado for the purpose of enhancing the species' survival. Permit... San Francisco garter snake (Thamnophis sirtalis tetrataenia) and take (harass by survey, capture...

  15. 77 FR 15383 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2012-03-15

    .... The proposed research will cover all aspects of behavior, reproductive physiology, genetics, nutrition...Nicol, Chandler, AR; PRT-66555A The applicant requests a permit to import a sport-hunted trophy of...

  16. 77 FR 7599 - Receipt of Applications for Endangered Species Permits

    Science.gov (United States)

    2012-02-13

    ... personal identifying information--may be made publicly available at any time. While you can ask us in your... Applicant: Daniel Judy, Mount Dora, Florida Applicant requests amendment of permit to allow for the take...

  17. 76 FR 46837 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2011-08-03

    ... your personal identifying information--may be made publicly available at any time. While you can ask us... Cave mold beetle (Batrisodes texanus) . Permit TE-170625 Applicant: Daniel Howard, Sioux Falls,...

  18. 2012: Special Use Permits : Rocky Mountain Arsenal NWR Complex

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This reference is a collection of Special Use Permits originating from the Rocky Mountain Arsenal NWR Complex. The Complex consists of Rocky Mountain Arsenal NWR,...

  19. 75 FR 4136 - Pipeline Safety: Requests for Special Permit

    Science.gov (United States)

    2010-01-26

    ... construction hydrostatic testing of the pipeline. These original construction hydrostatic tests were conducted more than thirty years ago. The application is for a special permit to waive the requirement to...

  20. Market power in auction and efficiency in emission permits allocation.

    Science.gov (United States)

    Jiang, Min Xing; Yang, Dong Xiao; Chen, Zi Yue; Nie, Pu Yan

    2016-12-01

    This paper analyzes how to achieve the cost-effectiveness by initial allocation of CO2 emission permits when a single dominant firm in production market has market power in auction, and compare two prevalent allocation patterns, mixed allocation and single auction. We show how the firm with market power may manipulate the auction price, thereby this leads to fail to achieve cost-effective solution by auction unless the total permits for allocation equal to the effective emissions cap. Provided that the market power firm receives strictly positive free permits, the effective emissions cap of mixed allocation is larger than that of single auction. The production market share of dominant firm is increasing with the free permits it holds. Finally, we examine the compliance costs and welfare of mixed allocation and single auction, the result show that the former is preferred to the later when policy makers consider economic welfare without welfare cost due to CO2 emissions.

  1. 77 FR 29453 - Applications for Modification of Special Permit

    Science.gov (United States)

    2012-05-17

    .... permit to authorize the containment cylinder or salvage cylinder without the internal piston. 11914-M... classified as other than Class 1 dependent on the characteristics of the AE. BILLING CODE 4909-60-M...

  2. EPA Office of Water (OW): Pollutant Discharge Permit Status

    Data.gov (United States)

    U.S. Environmental Protection Agency — U.S. States (Generalized) represents the 50 states and the District of Columbia of the United States joined with data from the NPDES Permit Backlog Report for the...

  3. 75 FR 20857 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-04-21

    ..., Wheat Ridge, Colorado. The applicant requests an amendment to an existing permit (October 7, 2002, 67 FR... (Solano grass) and Cordylanthus palmatus (palmate-bracted bird's-beak) from Federal lands in...

  4. Crow Municipal Rural & Industrial Pilot Water Treatment Plant NPDES Permit

    Science.gov (United States)

    Under NPDES permit MT-0031827, the Crow Indian Tribe is authorized to discharge from the Crow Municipal Rural & Industrial (MR&I) Pilot Water Treatment Plant in Bighorn County, Montana to the Bighorn River.

  5. 75 FR 20621 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-04-20

    ... Fish and Wildlife Service ; Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and... applications to conduct certain activities with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal...

  6. 2015: Special Use Permits : Rocky Mountain Arsenal NWR Complex

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This reference is a collection of Special Use Permits originating from the Rocky Mountain Arsenal NWR Complex. The Complex consists of Rocky Mountain Arsenal NWR,...

  7. Butte County Air Quality Management District Stationary Source Permits

    Science.gov (United States)

    U.S. EPA Public Notice: EPA is finalizing action on three permitting rules submitted as a revision to the Butte County Air Quality Management District (BCAQMD) portion of the California State Implementation Plan (SIP).

  8. 77 FR 19313 - Endangered Species; Marine Mammals; Issuance of Permits

    Science.gov (United States)

    2012-03-30

    ... endangered species, we found that (1) The application was filed in good faith, (2) The granted permit would... Richmond 77 FR 3493: March 15, 2012. Zoo. January 24, 2012. 694126 National 76 FR 80384; March 15,...

  9. 77 FR 38653 - Endangered Species; Marine Mammals; Issuance of Permits

    Science.gov (United States)

    2012-06-28

    ... endangered species, we found that (1) the application was filed in good faith, (2) the granted permit would.... 58210A Point Defiance Zoo & 77 FR 9687; February May 4, 2012. Aquarium. 17, 2012. 65782A, 65783A,...

  10. 76 FR 27660 - Endangered Species; Marine Mammals; Issuance of Permits

    Science.gov (United States)

    2011-05-12

    ... endangered species, we found that (1) The application was filed in good faith, (2) The granted permit would... Zoological 76 FR 12990; March 9, April 21, 2011. Society dba 2011. Brookfield Zoo. 24269A Chelonian...

  11. 77 FR 58406 - Endangered Species; Marine Mammals; Issuance of Permits

    Science.gov (United States)

    2012-09-20

    ... endangered species, we found that (1) The application was filed in good faith, (2) The granted permit would... Zoo and 77 FR 46514; August 3, August 27, 2012. Garden. 2012. Marine Mammals Receipt of...

  12. 76 FR 60863 - Endangered Species; Marine Mammals; Issuance of Permits

    Science.gov (United States)

    2011-09-30

    ... endangered species, we found that (1) The application was filed in good faith, (2) The granted permit would... September 22, 2011. Society dba Gladys 17, 2011. Porter Zoo. Marine Mammals 48293A Red Rock Films 76...

  13. 77 FR 74506 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2012-12-14

    ... conservation responsibilities for affected species, and in consideration of section 10(a)(1)(A) of the... before final action is taken. III. Permit Applications A. Endangered Species Applicant: Palm Beach Zoo...

  14. 77 FR 49453 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2012-08-16

    .... Applicant: Rancho Milagro, San Diego, TX; PRT-80160A The applicant requests a captive-bred wildlife.... Applicant: Rancho Milagro, San Diego, TX; PRT-80158A The applicant requests a permit authorizing...

  15. Administration of the NPDES Stormwater Permit Program in ...

    Science.gov (United States)

    2017-08-28

    In New England, the NPDES Stormwater Permit Program is administered by state government in Connecticut, Maine, Rhode Island, and Vermont ('authorized states') or by EPA, in partnership with the states, in Massachusetts and New Hampshire ('non-authorized states').

  16. 9 CFR 73.10 - Permitted dips; substances allowed.

    Science.gov (United States)

    2010-01-01

    ... flowers of sulphur or sulphur flour to 100 gallons of water; or a specifically permitted proprietary brand... such period as may be required under the Federal Meat Inspection Act (21 U.S.C., Supp. III, 601 et seq...

  17. 75 FR 30428 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-06-01

    ... of Michigan, Ann Arbor, MI; PRT-10640A The applicant requests a permit to import dried skin samples... (Lontra feline), manatees (Trichechus spp.), dugongs (Dugong dugon), polar bears (Ursus maritimus)...

  18. 9 CFR 82.11 - Issuance of permits.

    Science.gov (United States)

    2010-01-01

    ... INTERSTATE TRANSPORTATION OF ANIMALS (INCLUDING POULTRY) AND ANIMAL PRODUCTS EXOTIC NEWCASTLE DIS- EASE (END) AND CHLAMYDIOSIS Exotic Newcastle Disease (END) § 82.11 Issuance of permits. (a) Application for...

  19. 50 CFR 300.114 - Dealer permits and preapproval.

    Science.gov (United States)

    2010-10-01

    ... FISHERIES REGULATIONS Antarctic Marine Living Resources § 300.114 Dealer permits and preapproval. (a... calculating administrative costs of special products and services. The fee is specified with the...

  20. EPA Office of Water (OW): Pollutant Discharge Permit Status

    Data.gov (United States)

    U.S. Environmental Protection Agency — U.S. States (Generalized) represents the 50 states and the District of Columbia of the United States joined with data from the NPDES Permit Backlog Report for the...