WorldWideScience

Sample records for facility management plan

  1. Data Management Facility Operations Plan

    Energy Technology Data Exchange (ETDEWEB)

    Keck, Nicole N

    2014-06-30

    The Data Management Facility (DMF) is the data center that houses several critical Atmospheric Radiation Measurement (ARM) Climate Research Facility services, including first-level data processing for the ARM Mobile Facilities (AMFs), Eastern North Atlantic (ENA), North Slope of Alaska (NSA), Southern Great Plains (SGP), and Tropical Western Pacific (TWP) sites, as well as Value-Added Product (VAP) processing, development systems, and other network services.

  2. Management plan for Facility Effluent Monitoring Plan activities

    Energy Technology Data Exchange (ETDEWEB)

    Nickels, J.M.; Pratt, D.R.

    1991-08-01

    The DOE/RL 89-19, United States Department of Energy-Richland Operations Office Environmental Protection Implementation Plan (1989), requires the Hanford Site to prepare an Environmental Monitoring Plan (EMP) by November 9, 1991. The DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (1991), provides additional guidance and requires implementation of the EMP within 36 months of the effective data of the rule. DOE Order 5400.1, General Environmental Protection Program, requires each US Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials to prepare an EMP. This EMP is to identify and discuss two major activities: (1) effluent monitoring and (2) environmental surveillance. At the Hanford Site, the site-wide EMP will consist of the following elements: (1) A conceptual plan addressing effluent monitoring and environmental surveillance; (2) Pacific Northwest Laboratory (PNL) site-wide environmental surveillance program; (3) Westinghouse Hanford Company (Westinghouse Hanford) effluent monitoring program consisting of the near-field operations environmental monitoring activities and abstracts of each Facility Effluent Monitoring Plan (FEMP). This management plan addresses the third of these three elements of the EMP, the FEMPs.

  3. Information security management system planning for CBRN facilities

    Energy Technology Data Exchange (ETDEWEB)

    Lenaeu, Joseph D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); O' Neil, Lori Ross [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Leitch, Rosalyn M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Glantz, Clifford S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Landine, Guy P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Bryant, Janet L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lewis, John [National Nuclear Lab., Workington (United Kingdom); Mathers, Gemma [National Nuclear Lab., Workington (United Kingdom); Rodger, Robert [National Nuclear Lab., Workington (United Kingdom); Johnson, Christopher [National Nuclear Lab., Workington (United Kingdom)

    2015-12-01

    The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.

  4. The mixed waste management facility, FY95 plan

    Energy Technology Data Exchange (ETDEWEB)

    Streit, R.

    1994-12-01

    This document contains the Fiscal Year 1995 Plan for the Mixed Waste Management Facility (MWMF) at Lawrence Livermore National Laboratory. Major objectives to be completed during FY 1995 for the MWMF project are listed and described. This report also contains a budget plan, project task summaries, a milestone control log, and a responsibility assignment matrix for the MWMF project.

  5. Interactive Facility Management, Design and Planning

    NARCIS (Netherlands)

    Mobach, M.P.

    2012-01-01

    Societal developments show that future demands for visualization can be expected to grow. In many areas of organized human activities organizations may turn away from textual and numerical flatlands, and rely on the convenient and multidimensional digital worlds. Virtual worlds for facility

  6. Interactive facility management, design and planning

    NARCIS (Netherlands)

    Dr. Mark P. Mobach

    2012-01-01

    Societal developments show that future demands for visualization can be expected to grow. In many areas of organized human activities organizations may turn away from textual and numerical flatlands, and rely on the convenient and multidimensional digital worlds. Virtual worlds for facility

  7. Interactive facility management, design and planning

    NARCIS (Netherlands)

    Dr. Mark P. Mobach

    2012-01-01

    Societal developments show that future demands for visualization can be expected to grow. In many areas of organized human activities organizations may turn away from textual and numerical flatlands, and rely on the convenient and multidimensional digital worlds. Virtual worlds for facility manageme

  8. Interactive Facility Management, Design and Planning

    NARCIS (Netherlands)

    Mobach, M.P.

    2012-01-01

    Societal developments show that future demands for visualization can be expected to grow. In many areas of organized human activities organizations may turn away from textual and numerical flatlands, and rely on the convenient and multidimensional digital worlds. Virtual worlds for facility manageme

  9. WIPP Facility Work Plan for Solid Waste Management Units

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2001-02-25

    This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

  10. WIPP Facility Work Plan for Solid Waste Management Units

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2000-02-25

    This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility’s Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMED’s guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA

  11. National Ignition Facility Risk Management Plan, Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Brereton, S J

    2002-06-01

    The National Ignition Facility (NIF) Risk Management Plan (LLNL, 1997a) was originally prepared in 1997 in accordance with the Department of Energy (DOE) Life Cycle Asset Management Good Practice Guide (DOE, 1996a) and supported NIF Critical Decision 3, approval to initiate construction (DOE, 1997a). The plan was updated in 1998 to reflect realized risks such as the finding and successful clean up of polychlorinated biphenyl (PCB)-filled electrical capacitors at the NIF excavation during initial construction and the litigation of the Programmatic Environmental Impact Statement for Stockpile Stewardship (DOE, 1996b) by a group of non-governmental organizations led by the Natural Resources Defense Council. The current update of the Risk Management Plan brings it into compliance with the applicable DOE Orders and Standards and addresses new risks, such as assuring safety during the period when construction, special equipment installation, and commissioning are occurring simultaneously at the NIF site, and the extensive use of models to manage technical performance risk. The objectives of the updated plan are to: (1) Identify the risks to the completion of the Project in terms of meeting performance and regulatory requirements, ES&H, cost, and schedule; (2) Assess or the risks in terms of likelihood of occurrence and their impact potential relative to technical performance, ES&H, costs, and schedule; and (3) Address suitable risk mitigation measures for each identified risk.

  12. Educational Facilities: Planning, Modernization, and Management. Third Edition.

    Science.gov (United States)

    Castaldi, Basil

    Written for both students and practitioners, this book is a comprehensive treatise on the planning, remodeling, and maintenance of educational facilities. The subject matter is organized to blend theory and practice. Part I deals primarily with theory, principles, and techniques of educational facilities planning, covering school building history,…

  13. Pinellas Plant contingency plan for the hazardous waste management facility

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-04-01

    Subpart D of Part 264 (264.50 through .56) of the Resource Conservation and Recovery Act (RCRA) regulations require that each facility maintain a contingency plan detailing procedures to {open_quotes}minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water.{close_quotes}

  14. Field Research Facility Data Integration Framework Data Management Plan: Survey Lines Dataset

    Science.gov (United States)

    2016-08-01

    clearinghouse tool using the Environmental Systems Research Institute (Esri) Geoportal technology . Once the XML metadata is loaded into the Metadata Manager ...ER D C/ CH L SR -1 6- 4 Coastal Ocean Data Systems Program Field Research Facility Data Integration Framework Data Management Plan...Systems Program ERDC/CHL SR-16-4 August 2016 Field Research Facility Data Integration Framework Data Management Plan Survey Lines Dataset Michael F

  15. Recommendations for Emergency Management Planning for School Facilities.

    Science.gov (United States)

    Texas Education Agency, Austin.

    Numerous events, such as hurricanes, floods, and tornadoes, constitute a natural disaster for public schools. Human-caused disasters include hazardous-material emergencies, civil riots, fires, and nuclear accidents. This document contains emergency-management planning guidelines, developed by the Texas Education Agency, to help local school…

  16. Planning and managing future space facility projects. [management by objectives and group dynamics

    Science.gov (United States)

    Sieber, J. E.; Wilhelm, J. A.; Tanner, T. A.; Helmreich, R. L.; Burgenbauch, S. F.

    1979-01-01

    To learn how ground-based personnel of a space project plan and organize their work and how such planning and organizing relate to work outcomes, longitudinal study of the management and execution of the Space Lab Mission Development Test 3 (SMD 3) was performed at NASA Ames Research Center. A view of the problems likely to arise in organizations and some methods of coping with these problems are presented as well as the conclusions and recommendations that pertain strictly to SMD 3 management. Emphasis is placed on the broader context of future space facility projects and additional problems that may be anticipated. A model of management that may be used to facilitate problem solving and communication - management by objectives (MBO) is presented. Some problems of communication and emotion management that MBO does not address directly are considered. Models for promoting mature, constructive and satisfying emotional relationships among group members are discussed.

  17. CPP-603 Underwater Fuel Storage Facility Site Integrated Stabilization Management Plan (SISMP), Volume I

    Energy Technology Data Exchange (ETDEWEB)

    Denney, R.D.

    1995-10-01

    The CPP-603 Underwater Fuel Storage Facility (UFSF) Site Integrated Stabilization Management Plan (SISMP) has been constructed to describe the activities required for the relocation of spent nuclear fuel (SNF) from the CPP-603 facility. These activities are the only Idaho National Engineering Laboratory (INEL) actions identified in the Implementation Plan developed to meet the requirements of the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 to the Secretary of Energy regarding an improved schedule for remediation in the Defense Nuclear Facilities Complex. As described in the DNFSB Recommendation 94-1 Implementation Plan, issued February 28, 1995, an INEL Spent Nuclear Fuel Management Plan is currently under development to direct the placement of SNF currently in existing INEL facilities into interim storage, and to address the coordination of intrasite SNF movements with new receipts and intersite transfers that were identified in the DOE SNF Programmatic and INEL Environmental Restoration and Waste Management Environmental Impact Statement Record, of Decision. This SISMP will be a subset of the INEL Spent Nuclear Fuel Management Plan and the activities described are being coordinated with other INEL SNF management activities. The CPP-603 relocation activities have been assigned a high priority so that established milestones will be meet, but there will be some cases where other activities will take precedence in utilization of available resources. The Draft INEL Site Integrated Stabilization Management Plan (SISMP), INEL-94/0279, Draft Rev. 2, dated March 10, 1995, is being superseded by the INEL Spent Nuclear Fuel Management Plan and this CPP-603 specific SISMP.

  18. Atmospheric Radiation Measurement (ARM) Climate Research Facility Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Mather, James [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-04-01

    Mission and Vision Statements for the U.S. Department of Energy (DOE)’s Atmospheric Radiation Measurement (ARM) Climate Research Facility Mission The ARM Climate Research Facility, a DOE scientific user facility, provides the climate research community with strategically located in situ and remote-sensing observatories designed to improve the understanding and representation, in climate and earth system models, of clouds and aerosols as well as their interactions and coupling with the Earth’s surface. Vision To provide a detailed and accurate description of the Earth atmosphere in diverse climate regimes to resolve the uncertainties in climate and Earth system models toward the development of sustainable solutions for the nation's energy and environmental challenges.

  19. Natural Resources Management Plan for Naval Air Facility, Midway Island

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Included within this plan are recommendations to minimize conflicts and take advantage of opportunities to provide a balance between natural resources and man at NAF...

  20. XPLanner: A knowledge-based decision support system for facility management and planning

    OpenAIRE

    S-Y Han; Kim, T. J.; I Adiguzel

    1991-01-01

    A case study is reported of the design, implementation, and evaluation of a knowledge-based decision support system, XPLanner. XPLanner integrates an expert system with optimization modeling technique, database management system, and interactive user interface to create a comprehensive decision aid for facility management and planning by the US Army. It is believed that integrating the expert system with the modeling and data management capabilities of decision support systems can create a co...

  1. Mixed Waste Management Facility, revised FY94 Plan

    Energy Technology Data Exchange (ETDEWEB)

    Streit, R.

    1994-07-31

    This revision of the FY94 Plan incorporates changes to work during FY94 in response to the DOE request in the DOE KD-1 decision letter of June 28,1994. This letter provided guidance of both scope and budget profile in response to the Conceptual Design Report (CDR) issued by the MWMF Project in April, 1994. This work plan only addresses work for the remainder of FY94. A revised plan for the complete project is in development and will be issued separately. Since February, 1994, the MWMF Project has been operating on DOE guidance directing that work on the CDR be completed, that only other essential work be continued to maintain the project, and that costs be maintained at approximately the January, 1994 spending levels until a KD-1 decision was made. This has formed the basis for monthly reports through June, 1994. The baseline contained in this report will become the basis for reports during the remainder of FY94.

  2. Project Hanford management contract quality assurance program implementation plan for nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    Bibb, E.K.

    1997-10-15

    During transition from the Westinghouse Hanford Company (WHC) Management and Operations (M and O) contract to the Fluor Daniel Hanford (FDH) Management and Integration (M and I) contract, existing WHC policies, procedures, and manuals were reviewed to determine which to adopt on an interim basis. Both WHC-SP-1131,Hanford Quality Assurance Program and Implementation Plan, and WHC-CM-4-2, Quality Assurance Manual, were adopted; however, it was recognized that revisions were required to address the functions and responsibilities of the Project Hanford Management Contract (PHMC). This Quality Assurance Program Implementation Plan for Nuclear Facilities (HNF-SP-1228) supersedes the implementation portion of WHC-SP-1 13 1, Rev. 1. The revised Quality Assurance (QA) Program is documented in the Project Hanford Quality Assurance Program Description (QAPD), HNF-MP-599. That document replaces the QA Program in WHC-SP-1131, Rev. 1. The scope of this document is limited to documenting the nuclear facilities managed by FDH and its Major Subcontractors (MSCS) and the status of the implementation of 10 CFR 830.120, Quality Assurance Requirements, at those facilities. Since the QA Program for the nuclear facilities is now documented in the QAPD, future updates of the information provided in this plan will be by letter. The layout of this plan is similar to that of WHC-SP-1 13 1, Rev. 1. Sections 2.0 and 3.0 provide an overview of the Project Hanford QA Program. A list of Project Hanford nuclear facilities is provided in Section 4.0. Section 5.0 provides the status of facility compliance to 10 CFR 830.120. Sections 6.0, 7.0, and 8.0 provide requested exemptions, status of open items, and references, respectively. The four appendices correspond to the four projects that comprise Project Hanford.

  3. Environmental Management Waste Management Facility (EMWMF) Site-Specific Health and Safety Plan, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Flynn, N.C. Bechtel Jacobs

    2008-04-21

    The Bechtel Jacobs Company LLC (BJC) policy is to provide a safe and healthy workplace for all employees and subcontractors. The implementation of this policy requires that operations of the Environmental Management Waste Management Facility (EMWMF), located one-half mile west of the U.S. Department of Energy (DOE) Y-12 National Security Complex, be guided by an overall plan and consistent proactive approach to environment, safety and health (ES&H) issues. The BJC governing document for worker safety and health, BJC/OR-1745, 'Worker Safety and Health Program', describes the key elements of the BJC Safety and Industrial Hygiene (IH) programs, which includes the requirement for development and implementation of a site-specific Health and Safety Plan (HASP) where required by regulation (refer also to BJC-EH-1012, 'Development and Approval of Safety and Health Plans'). BJC/OR-1745, 'Worker Safety and Health Program', implements the requirements for worker protection contained in Title 10 Code of Federal Regulations (CFR) Part 851. The EMWMF site-specific HASP requirements identifies safe operating procedures, work controls, personal protective equipment, roles and responsibilities, potential site hazards and control measures, site access requirements, frequency and types of monitoring, site work areas, decontamination procedures, and outlines emergency response actions. This HASP will be available on site for use by all workers, management and supervisors, oversight personnel and visitors. All EMWMF assigned personnel will be briefed on the contents of this HASP and will be required to follow the procedures and protocols as specified. The policies and procedures referenced in this HASP apply to all EMWMF operations activities. In addition the HASP establishes ES&H criteria for the day-to-day activities to prevent or minimize any adverse effect on the environment and personnel safety and health and to meet standards that define acceptable

  4. Monitoring plan for routine organic air emissions at the Radioactive Waste Management Complex Waste Storage Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Galloway, K.J.; Jolley, J.G.

    1994-06-01

    This monitoring plan provides the information necessary to perform routine organic air emissions monitoring at the Waste Storage Facilities located at the Transuranic Storage Area of the Radioactive Waste Management Complex at the Idaho National Engineering Laboratory. The Waste Storage Facilities include both the Type I and II Waste Storage Modules. The plan implements a dual method approach where two dissimilar analytical methodologies, Open-Path Fourier Transform Infrared Spectroscopy (OP-FTIR) and ancillary SUMMA{reg_sign} canister sampling, following the US Environmental Protection Agency (EPA) analytical method TO-14, will be used to provide qualitative and quantitative volatile organic concentration data. The Open-Path Fourier Transform Infrared Spectroscopy will provide in situ, real time monitoring of volatile organic compound concentrations in the ambient air of the Waste Storage Facilities. To supplement the OP-FTIR data, air samples will be collected using SUMMA{reg_sign}, passivated, stainless steel canisters, following the EPA Method TO-14. These samples will be analyzed for volatile organic compounds with gas chromatograph/mass spectrometry analysis. The sampling strategy, procedures, and schedules are included in this monitoring plan. The development of this monitoring plan is driven by regulatory compliance to the Resource Conservation and Recovery Act, State of Idaho Toxic Air Pollutant increments, Occupational Safety and Health Administration. The various state and federal regulations address the characterization of the volatile organic compounds and the resultant ambient air emissions that may originate from facilities involved in industrial production and/or waste management activities.

  5. Standard Guide for Preparing Waste Management Plans for Decommissioning Nuclear Facilities

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2010-01-01

    1.1 This guide addresses the development of waste management plans for potential waste streams resulting from decommissioning activities at nuclear facilities, including identifying, categorizing, and handling the waste from generation to final disposal. 1.2 This guide is applicable to potential waste streams anticipated from decommissioning activities of nuclear facilities whose operations were governed by the Nuclear Regulatory Commission (NRC) or Agreement State license, under Department of Energy (DOE) Orders, or Department of Defense (DoD) regulations. 1.3 This guide provides a description of the key elements of waste management plans that if followed will successfully allow for the characterization, packaging, transportation, and off-site treatment or disposal, or both, of conventional, hazardous, and radioactive waste streams. 1.4 This guide does not address the on-site treatment, long term storage, or on-site disposal of these potential waste streams. 1.5 This standard does not purport to address ...

  6. Investigation of development and management of treatment planning systems for BNCT at foreign facilities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    A new computational dosimetry system for BNCT: JCDS is developed by JAERI in order to carry out BNCT with epithermal neutron beam at present. The development and management situation of computational dosimetry system, which are developed and are used in BNCT facilities in foreign countries, were investigated in order to accurately grasp functions necessary for preparation of the treatment planning and its future subjects. In present state, 'SERA', which are developed by Idaho National Engineering and Environmental Laboratory (INEEL), is used in many BNCT facilities. Followings are necessary for development and management of the treatment planning system. (1) Reliability confirmation of system performance by verification as comparison examination of calculated value with actual experimental measured value. (2) Confirmation systems such as periodic maintenance for retention of the system quality. (3) The improvement system, which always considered relative merits and demerits with other computational dosimetry system. (4) The development of integrated system with patient setting. (author)

  7. Facility Response Plan (FRP)

    Data.gov (United States)

    U.S. Environmental Protection Agency — A Facility Response Plan (FRP) demonstrates a facility's preparedness to respond to a worst case oil discharge. Under the Clean Water Act, as amended by the Oil...

  8. Planning and Designing Safe Facilities

    Science.gov (United States)

    Seidler, Todd

    2006-01-01

    Those who manage physical education, athletic, and recreation programs have a number of legal duties that they are expected to carry out. Among these are an obligation to take reasonable precautions to ensure safe programs and facilities for all participants, spectators, and staff. Physical education and sports facilities that are poorly planned,…

  9. Risk Management Plan (RMP) Facility Points, Region 9, 2014, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — Risk Management Plan (RMP): Under the Clean Air Act, Section 112(r), the EPA established a program requiring risk management plans to be provided to the EPA by...

  10. Energy Management Plan.

    Science.gov (United States)

    Tasmania Dept. of Education, Hobart (Australia). Facilities Services Section.

    This report presents an overview of the energy management plan for Tasmanian schools designed to minimize the costs of all forms of energy usage within these facilities. The policy and objectives of the plan are provided along with details of the plan itself and its current status. Appendices contain an extract from Asset Management Plan for Real…

  11. Five Recession-Driven Strategies for Planning and Managing Campus Facilities

    Science.gov (United States)

    Rudden, Michael S.

    2010-01-01

    Colleges and universities continue to face significant fiscal challenges in the current recession. A review of ongoing campus facilities planning projects, coupled with a review of more than 30 recent campus master planning requests for proposals and the relevant literature, indicates that colleges and universities are finding innovative ways to…

  12. Five Recession-Driven Strategies for Planning and Managing Campus Facilities

    Science.gov (United States)

    Rudden, Michael S.

    2010-01-01

    Colleges and universities continue to face significant fiscal challenges in the current recession. A review of ongoing campus facilities planning projects, coupled with a review of more than 30 recent campus master planning requests for proposals and the relevant literature, indicates that colleges and universities are finding innovative ways to…

  13. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    Energy Technology Data Exchange (ETDEWEB)

    Nickels, J.M.

    1991-06-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs.

  14. Comprehensive facilities plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitate existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.

  15. Risk Management Plan Rule

    Science.gov (United States)

    RMP implements Section 112(r) of the 1990 Clean Air Act amendments, and requires facilities that use extremely hazardous substances to develop a Risk Management Plan and revise/resubmit every five years. Find guidance, factsheets, training, and assistance.

  16. Facility Response Plan

    Science.gov (United States)

    1992-10-06

    10,500 gallons)? Yes Are rmarn transfer No opwatbons excsively moble (O.e tank truck at dock)? Signfiant and Substanlla harm substantial harm L Submit...current technology . one or more of the following provisions will normally be found on newer tank installationst " High-liquid level alarms with an...transportation- related facilities in adverse weather. The appropriate limitations for such planning are available technology and the practical and

  17. Energy conservation and management plan for plant facilities at the Livermore site

    Energy Technology Data Exchange (ETDEWEB)

    Ng, W.; Szybalski, S.; Kerr, W. H.; Meyer, H. J.

    1976-03-15

    An energy conservation and management plan for the Livermore site of the Lawrence Livermore Laboratory is presented. The plan defines the energy-conservation goals for the next 10 years and proposes the ways and means of attaining them. The main features contained in this plan are as follows: development of the criteria and underlying assumptions required for long range planning, including energy growth rates and the case for using the concept of the technical-fix energy growth rate, LLL energy outlook and fuel cost projections, and life-cycle-cost criteria; targets of the long-range plan include between 1975 and 1985, an annual energy usage growth equal to 5.8 percent of the 1975 energy consumption, 1985 and thereafter, zero energy growth, a change from the current dependence on natural gas to the use of other fuels for heating, and a doubling of the 30-day strategic oil storage capacity; and cost schedule for the next 10 years.

  18. Management self assessment plan

    Energy Technology Data Exchange (ETDEWEB)

    Debban, B.L.

    1998-01-30

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled to begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations.

  19. A Microsoft Project-Based Planning, Tracking, and Management Tool for the National Transonic Facility's Model Changeover Process

    Science.gov (United States)

    Vairo, Daniel M.

    1998-01-01

    The removal and installation of sting-mounted wind tunnel models in the National Transonic Facility (NTF) is a multi-task process having a large impact on the annual throughput of the facility. Approximately ten model removal and installation cycles occur annually at the NTF with each cycle requiring slightly over five days to complete. The various tasks of the model changeover process were modeled in Microsoft Project as a template to provide a planning, tracking, and management tool. The template can also be used as a tool to evaluate improvements to this process. This document describes the development of the template and provides step-by-step instructions on its use and as a planning and tracking tool. A secondary role of this document is to provide an overview of the model changeover process and briefly describe the tasks associated with it.

  20. The Mixed Waste Management Facility: Technology selection and implementation plan, Part 2, Support processes

    Energy Technology Data Exchange (ETDEWEB)

    Streit, R.D.; Couture, S.A.

    1995-03-01

    The purpose of this document is to establish the foundation for the selection and implementation of technologies to be demonstrated in the Mixed Waste Management Facility, and to select the technologies for initial pilot-scale demonstration. Criteria are defined for judging demonstration technologies, and the framework for future technology selection is established. On the basis of these criteria, an initial suite of technologies was chosen, and the demonstration implementation scheme was developed. Part 1, previously released, addresses the selection of the primary processes. Part II addresses process support systems that are considered ``demonstration technologies.`` Other support technologies, e.g., facility off-gas, receiving and shipping, and water treatment, while part of the integrated demonstration, use best available commercial equipment and are not selected against the demonstration technology criteria.

  1. Environmental Protection Agency (EPA) Facility Registry Service (FRS) Emergency Response (ER) Risk Management Plan (RMP) Facilities - Oil and Hazardous Materials

    Data.gov (United States)

    Department of Homeland Security — The purpose of this web feature service is to provide users with access to integrated facility information from FRS, limited to the subset of facilities that link to...

  2. Formulation and preparation on Hanford Waste Treatment Plan direct feed low activity waste effluent management facility core simulant

    Energy Technology Data Exchange (ETDEWEB)

    McCabe, Daniel J. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Nash, Charles A. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL; Adamson, Duane J. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL

    2016-05-01

    The Hanford Waste Treatment and Immobilization Plant (WTP) Low Activity Waste (LAW) vitrification facility will generate an aqueous condensate recycle stream (LAW Melter Off-Gas Condensate, LMOGC) from the off-gas system. The baseline plan for disposition of this stream during full WTP operations is to send it to the WTP Pretreatment Facility, where it will be blended with LAW, concentrated by evaporation and recycled to the LAW vitrification facility. However, during the Direct Feed LAW (DFLAW) scenario, planned disposition of this stream is to evaporate it in a new evaporator in the Effluent Management Facility (EMF) and then return it to the LAW melter. It is important to understand the composition of the effluents from the melter and new evaporator so that the disposition of these streams can be accurately planned and accommodated. Furthermore, alternate disposition of the LMOGC stream would eliminate recycling of problematic components, and would enable less integrated operation of the LAW melter and the Pretreatment Facilities. Alternate disposition would also eliminate this stream from recycling within WTP when it begins operations and would decrease the LAW vitrification mission duration and quantity of glass waste, amongst the other problems such a recycle stream present. This LAW Melter Off-Gas Condensate stream will contain components that are volatile at melter temperatures and are problematic for the glass waste form, such as halides and sulfate. Because this stream will recycle within WTP, these components accumulate in the Melter Condensate stream, exacerbating their impact on the number of LAW glass containers that must be produced. Diverting the stream reduces the halides and sulfate in the recycled Condensate and is a key outcome of this work. This overall program examines the potential treatment and immobilization of this stream to enable alternative disposal. The objective of this task was to formulate and prepare a simulant of the LAW Melter

  3. 15 CFR 923.13 - Energy facility planning process.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Energy facility planning process. 923... facility planning process. The management program must contain a planning process for energy facilities... affected public and private parties will be involved in the planning process. ...

  4. National Ignition Facility project acquisition plan revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Clobes, A.R.

    1996-10-01

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility M Project. It was prepared for the NIP Prood Office by the NIF Procurement Manager.

  5. Maintenance Implementation Plan for the Grout Facility

    Energy Technology Data Exchange (ETDEWEB)

    Yoakum, A.K.

    1993-08-01

    The objective of the Maintenance Implementation Plan (MIP) is to describe how the Grout Treatment Facility will implement the requirements established by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program, Chapter 2.0 Nuclear Facilities (DOE 1990). The plan provides a blueprint for a disciplined approach to implementation and compliance. Each element of the order is prioritized, categorized, and then placed into one of three phases for implementation.

  6. Facility Environmental Management System

    Data.gov (United States)

    Federal Laboratory Consortium — This is the Web site of the Federal Highway Administration's (FHWA's) Turner-Fairbank Highway Research Center (TFHRC) facility Environmental Management System (EMS)....

  7. Wanaket Wildlife Area Management Plan : Five-Year Plan for Protecting, Enhancing, and Mitigating Wildlife Habitat Losses for the McNary Hydroelectric Facility.

    Energy Technology Data Exchange (ETDEWEB)

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    2001-09-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to continue to protect, enhance, and mitigate wildlife and wildlife habitat at the Wanaket Wildlife Area. The Wanaket Wildlife Area was approved as a Columbia River Basin Wildlife Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1993. This management plan will provide an update of the original management plan approved by BPA in 1995. Wanaket will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the McNary Hydroelectric facility on the Columbia River. By funding the enhancement and operation and maintenance of the Wanaket Wildlife Area, BPA will receive credit towards their mitigation debt. The purpose of the Wanaket Wildlife Area management plan update is to provide programmatic and site-specific standards and guidelines on how the Wanaket Wildlife Area will be managed over the next five years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management. Specific project objectives are related to protection and enhancement of wildlife habitats and are expressed in terms of habitat units (HU's). Habitat units were developed by the US Fish and Wildlife Service's Habitat Evaluation Procedures (HEP), and are designed to track habitat gains and/or losses associated with mitigation and/or development projects. Habitat Units for a given species are a product of habitat quantity (expressed in acres) and habitat quality estimates. Habitat quality estimates are developed using Habitat Suitability Indices (HSI). These indices are based on quantifiable habitat features such

  8. Samarbejdsformer og Facilities Management

    DEFF Research Database (Denmark)

    Storgaard, Kresten

    Resultater fra en surveyundersøgelse om fordele og ulemper ved forskellige samarbejdsformer indenfor Facilities Management fremlægges.......Resultater fra en surveyundersøgelse om fordele og ulemper ved forskellige samarbejdsformer indenfor Facilities Management fremlægges....

  9. Samarbejdsformer og Facilities Management

    DEFF Research Database (Denmark)

    Storgaard, Kresten

    Resultater fra en surveyundersøgelse om fordele og ulemper ved forskellige samarbejdsformer indenfor Facilities Management fremlægges.......Resultater fra en surveyundersøgelse om fordele og ulemper ved forskellige samarbejdsformer indenfor Facilities Management fremlægges....

  10. Sustainable Facilities Management

    DEFF Research Database (Denmark)

    Nielsen, Susanne Balslev; Elle, Morten; Hoffmann, Birgitte

    2004-01-01

    The Danish public housing sector has more than 20 years of experience with sustainable facilities management based on user involvement. The paper outlines this development in a historical perspective and gives an analysis of different approaches to sustainable facilities management. The focus...... is on the housing departments and strateies for the management of the use of resources. The research methods used are case studies based on interviews in addition to literature studies. The paper explores lessons to be learned about sustainable facilities management in general, and points to a need for new...

  11. Integrated Facilities and Infrastructure Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Reisz Westlund, Jennifer Jill

    2017-03-01

    Our facilities and infrastructure are a key element of our capability-based science and engineering foundation. The focus of the Integrated Facilities and Infrastructure Plan is the development and implementation of a comprehensive plan to sustain the capabilities necessary to meet national research, design, and fabrication needs for Sandia National Laboratories’ (Sandia’s) comprehensive national security missions both now and into the future. A number of Sandia’s facilities have reached the end of their useful lives and many others are not suitable for today’s mission needs. Due to the continued aging and surge in utilization of Sandia’s facilities, deferred maintenance has continued to increase. As part of our planning focus, Sandia is committed to halting the growth of deferred maintenance across its sites through demolition, replacement, and dedicated funding to reduce the backlog of maintenance needs. Sandia will become more agile in adapting existing space and changing how space is utilized in response to the changing requirements. This Integrated Facilities & Infrastructure (F&I) Plan supports the Sandia Strategic Plan’s strategic objectives, specifically Strategic Objective 2: Strengthen our Laboratories’ foundation to maximize mission impact, and Strategic Objective 3: Advance an exceptional work environment that enables and inspires our people in service to our nation. The Integrated F&I Plan is developed through a planning process model to understand the F&I needs, analyze solution options, plan the actions and funding, and then execute projects.

  12. Facility Effluent Monitoring Plan determinations for the 600 Area facilities

    Energy Technology Data Exchange (ETDEWEB)

    Nickels, J.M.

    1991-08-01

    This document determines the need for Facility Effluent Monitoring Plans for Westinghouse Hanford Company's 600 Area facilities on the Hanford Site. The Facility Effluent Monitoring Plan determinations were prepared in accordance with A Guide For Preparing Hanford Site Facility Effluent Monitoring Plans (WHC 1991). Five major Westinghouse Hanford Company facilities in the 600 Area were evaluated: the Purge Water Storage Facility, 212-N, -P, and -R Facilities, the 616 Facility, and the 213-J K Storage Vaults. Of the five major facilities evaluated in the 600 Area, none will require preparation of a Facility Effluent Monitoring Plan.

  13. Environmental assessment: Proposed construction of Refuge operational facilities, water management facilities, wildlife oriented interpretation/recreation development, road and water management facilities rehabilitation, and implementation of a vegetation control plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The proposed action consists of the construction of facilities for refuge operation, water management, and wildlife-oriented interpretation and recreation; the...

  14. FACILITIES MANAGEMENT AT CERN

    CERN Multimedia

    2002-01-01

    Recently we have been confronted with difficulties concerning services which are part of a new contract for facilities management. Please see below for some information about this contract. Following competitive tendering and the Finance Committee decision, the contract was awarded to the Swiss firm 'Facilities Management Network (FMN)'. The owners of FMN are two companies 'M+W Zander' and 'Avireal', both very experienced in this field of facilities management. The contract entered into force on 1st July 2002. CERN has grouped together around 20 different activities into this one contract, which was previously covered by separate contracts. The new contract includes the management and execution of many activities, in particular: Guards and access control; cleaning; operation and maintenance of heating plants, cooling and ventilation equipment for buildings not related to the tunnel or the LHC; plumbing; sanitation; lifts; green areas and roads; waste disposal; and includes a centralised helpdesk for these act...

  15. Cad Graphics in Facilities Planning.

    Science.gov (United States)

    Collier, Linda M.

    1984-01-01

    By applying a computer-aided drafting system to a range of facilities layouts and plans, a division of Tektronix, Inc., Oregon, is maintaining staffing levels with an added workload. The tool is also being used in other areas of the company for illustration, design, and administration. (MLF)

  16. Does PDC Belong in Facilities Management?

    Science.gov (United States)

    Dessoff, Alan

    2012-01-01

    Whether planning, design, and construction (PDC) of buildings should be part of facilities management, with its traditional operations and maintenance functions, or separated from it, has been a divisive question on many campuses for a long time. Now, although it is not happening everywhere, facilities managers at a number of institutions, public…

  17. Plutonium Vulnerability Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

  18. Environmental Restoration and Waste Management Site-Specific Plan for the Oak Ridge Reservation. [Appendix contains accromyms list and maps of waste management facilities

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The United States Department of Energy (DOE) is committed to achieving and maintaining environmental regulatory compliance at its waste sites and facilities, while responding to public concerns and emphasizing waste minimization. DOE publishes the Environmental Restoration and Waste Management Five-Year Plan (FYP) annually to document its progress towards these goals. The purpose of this Site-Specific Plan (SSP) is to describe the activities, planned and completed, undertaken to implement these FYP goals at the DOE Field Office-Oak Ridge (DOE/OR) installations and programs; specifically, for the Oak Ridge Reservation (ORR), Oak Ridge Associated Universities (ORAU), and Hazardous Waste Remedial Action Program (HAZWRAP). Activities described in this SSP address hazardous, radioactive, mixed, and sanitary wastes, along with treatment, storage, and disposal of current production waste and legacy waste from past operation. The SSP is presented in sections emphasizing Corrective Activities (A), Environmental Restoration (ER), Waste Management (WM), Technology Development (TD), and Transportation; and includes descriptions of activities, resources, and milestones by installation or program. 87 tabs.

  19. Interim Status Groundwater Monitoring Plan for Low-Level Waste Management Areas 1 to 4, RCRA Facilities, Hanford,Washington

    Energy Technology Data Exchange (ETDEWEB)

    Dresel, P Evan

    2004-10-25

    This document describes the monitoring plan to meet the requirements for interim status groundwater monitoring at Hanford Site low-level waste burial grounds as specified by 40 CFR 265, incorporated by reference in WAC 173-303-400. The monitoring will take place at four separate low-level waste management areas in the 200-West and 200-East Areas, in the central part of the site. This plan replaces the previous monitoring plan.

  20. 40 CFR 35.2030 - Facilities planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Facilities planning. 35.2030 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2030 Facilities planning. (a) General. (1) Facilities planning consists of those necessary plans and studies which directly relate to...

  1. ICDF Complex Operations Waste Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    W.M. Heileson

    2006-12-01

    This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.

  2. National Ignition Facility wet weather construction plan

    Energy Technology Data Exchange (ETDEWEB)

    Kugler, A N

    1998-01-01

    This report presents a wet weather construction plan for the National Ignition Facility (NIF) construction project. Construction of the NIF commenced in mid- 1997, and excavation of the site was completed in the fall. Preparations for placing concrete foundations began in the fall, and above normal rainfall is expected over the tinter. Heavy rainfall in late November impacted foundation construction, and a wet weather construction plan was determined to be needed. This wet weather constiction plan recommends a strategy, techniques and management practices to prepare and protect the site corn wet weather effects and allow construction work to proceed. It is intended that information in this plan be incorporated in the Stormwater Pollution Prevention Plan (SWPPP) as warranted.

  3. Oak Ridge Reservation Waste Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Turner, J.W. [ed.

    1995-02-01

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year.

  4. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  5. DKIST facility management system integration

    Science.gov (United States)

    White, Charles R.; Phelps, LeEllen

    2016-07-01

    The Daniel K. Inouye Solar Telescope (DKIST) Observatory is under construction at Haleakalā, Maui, Hawai'i. When complete, the DKIST will be the largest solar telescope in the world. The Facility Management System (FMS) is a subsystem of the high-level Facility Control System (FCS) and directly controls the Facility Thermal System (FTS). The FMS receives operational mode information from the FCS while making process data available to the FCS and includes hardware and software to integrate and control all aspects of the FTS including the Carousel Cooling System, the Telescope Chamber Environmental Control Systems, and the Temperature Monitoring System. In addition it will integrate the Power Energy Management System and several service systems such as heating, ventilation, and air conditioning (HVAC), the Domestic Water Distribution System, and the Vacuum System. All of these subsystems must operate in coordination to provide the best possible observing conditions and overall building management. Further, the FMS must actively react to varying weather conditions and observational requirements. The physical impact of the facility must not interfere with neighboring installations while operating in a very environmentally and culturally sensitive area. The FMS system will be comprised of five Programmable Automation Controllers (PACs). We present a pre-build overview of the functional plan to integrate all of the FMS subsystems.

  6. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    Energy Technology Data Exchange (ETDEWEB)

    Frazier, T.P.

    1994-10-20

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans.

  7. PK-12 Public Educational Facilities Master Plan Evaluation Guide

    Science.gov (United States)

    21st Century School Fund, 2011

    2011-01-01

    Proper planning of school facilities is critical for all school districts no matter how large or small, whether major construction is in the works or the district is managing enrollment declines. When school districts properly plan for their school facilities they have better schools, more public use and higher value for public spending. This…

  8. World Class Facilities Management

    DEFF Research Database (Denmark)

    Malmstrøm, Ole Emil; Jensen, Per Anker

    2013-01-01

    Alle der med entusiasme arbejder med Facilities Management drømmer om at levere World Class. DFM drømmer om at skabe rammer og baggrund for, at vi i Danmark kan bryste os at være blandt de førende på verdensplan. Her samles op på, hvor tæt vi er på at nå drømmemålet.......Alle der med entusiasme arbejder med Facilities Management drømmer om at levere World Class. DFM drømmer om at skabe rammer og baggrund for, at vi i Danmark kan bryste os at være blandt de førende på verdensplan. Her samles op på, hvor tæt vi er på at nå drømmemålet....

  9. World Class Facilities Management

    DEFF Research Database (Denmark)

    Malmstrøm, Ole Emil; Jensen, Per Anker

    2013-01-01

    Alle der med entusiasme arbejder med Facilities Management drømmer om at levere World Class. DFM drømmer om at skabe rammer og baggrund for, at vi i Danmark kan bryste os at være blandt de førende på verdensplan. Her samles op på, hvor tæt vi er på at nå drømmemålet.......Alle der med entusiasme arbejder med Facilities Management drømmer om at levere World Class. DFM drømmer om at skabe rammer og baggrund for, at vi i Danmark kan bryste os at være blandt de førende på verdensplan. Her samles op på, hvor tæt vi er på at nå drømmemålet....

  10. Phase 1 RCRA Facility Investigation & Corrective Measures Study Work Plan for Single Shell Tank (SST) Waste Management Areas

    Energy Technology Data Exchange (ETDEWEB)

    MCCARTHY, M.M.

    1999-08-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly.

  11. Promoting and Disseminating Good Practice in the Planning and Management of Educational Facilities: Capital Investment Strategic Planning - A Case Study, Gold Coast Institute of TAFE, Queensland, Australia.

    Science.gov (United States)

    Crump, Kelvin

    This paper presents a case study of the process of capital investment strategic planning at the Gold Coast Institute of Technical and Further Education (TAFE), Queensland, Australia. Capital investment strategic planning is a means of contributing to success by providing strategies to ensure that assets are managed efficiently, effectively, and…

  12. Hanford site sodium management plan

    Energy Technology Data Exchange (ETDEWEB)

    Guttenberg, S.

    1995-09-25

    The Hanford Site Sodium Management Plan, Revision 1, provides changes to the major elements and management strategy to ensure an integrated and coordinated approach for disposition of the more than 350,000 gallons of sodium and related sodium facilities located at the DOE`s Hanford Site

  13. Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas

    Energy Technology Data Exchange (ETDEWEB)

    ROGERS, P.M.

    2000-06-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted.

  14. Solid Waste Management Plan. Revision 4

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-26

    The waste types discussed in this Solid Waste Management Plan are Municipal Solid Waste, Hazardous Waste, Low-Level Mixed Waste, Low-Level Radioactive Waste, and Transuranic Waste. The plan describes for each type of solid waste, the existing waste management facilities, the issues, and the assumptions used to develop the current management plan.

  15. Facility effluent monitoring plan for the fast flux test facility

    Energy Technology Data Exchange (ETDEWEB)

    Nickels, J M; Dahl, N R

    1992-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in US Department of Energy Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could affect employee or public safety or the environment. A Facility Effluent Monitoring Plan determination was performed during calendar year 1991 and the evaluation requires the need for a facility effluent monitoring plan. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements.

  16. Near-facility environmental monitoring quality assurance project plan

    Energy Technology Data Exchange (ETDEWEB)

    McKinney, S.M.

    1997-11-24

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site.

  17. Region 9 Facility Response Plan (FRP) - 2014

    Data.gov (United States)

    U.S. Environmental Protection Agency — A Facility Response Plan (FRP) demonstrates a facility's preparedness to respond to a worst case oil discharge. Under the Clean Water Act, as amended by the Oil...

  18. The Bricks-and-Mortar Trusteeship: School Boards and School Facilities Planning. A Position Paper.

    Science.gov (United States)

    New York State School Boards Association, Albany.

    Guidance is provided in the area of facilities planning, design, and management. Facilities directly influence learning in physical as well as psychological ways. In facilities development, long-range plannning is critical. Strategic and tactical planning characterize an effective planning process. Facilities advisory committees should be involved…

  19. Environmental Management System Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most

  20. Merging facility and financial planning: a new approach.

    Science.gov (United States)

    Douglass, R; Hoffman, S

    1988-01-01

    This article seeks to help hospital administrators and boards (especially planning and finance committees) balance facility and financial aspects of a construction project by planning for each concurrently. It recommends that the process start with formal strategic plans, and that facility and capital plans be advanced interactively, thus maintaining flexibility to ensure that the hospital's objectives can be met within manageable financial limits. The authors suggest that the project thus delivered will be the most effective and efficient project possible within defined constraints. And, once planned, the project will be ready for implementation--false starts will be eliminated.

  1. Energy planning and management plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration`s final draft and environmental impact statement, and Energy Planning and Management Program.

  2. Facility effluent monitoring plan for the 327 Facility

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-11-01

    The 327 Facility [Post-Irradiation Testing Laboratory] provides office and laboratory space for Pacific Northwest Laboratory (PNL) scientific and engineering staff conducting multidisciplinary research in the areas of post-irradiated fuels and structural materials. The facility is designed to accommodate the use of radioactive and hazardous materials in the conduct of these activities. This report summarizes the airborne emissions and liquid effluents and the results of the Facility Effluent Monitoring Plan (FEMP) determination for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements.

  3. Facility effluent monitoring plan for the tank farm facility

    Energy Technology Data Exchange (ETDEWEB)

    Crummel, G.M.

    1998-05-18

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements.

  4. New Applications of Gamma Spectroscopy: Characterization Tools for D&D Process Development, Inventory Reduction Planning & Shipping, Safety Analysis & Facility Management During the Heavy Element Facility Risk Reduction Program

    Energy Technology Data Exchange (ETDEWEB)

    Mitchell, M; Anderson, B; Gray, L; Vellinger, R; West, M; Gaylord, R; Larson, J; Jones, G; Shingleton, J; Harris, L; Harward, N

    2006-01-23

    Novel applications of gamma ray spectroscopy for D&D process development, inventory reduction, safety analysis and facility management are discussed in this paper. These applications of gamma spectroscopy were developed and implemented during the Risk Reduction Program (RPP) to successfully downgrade the Heavy Element Facility (B251) at Lawrence Livermore National Laboratory (LLNL) from a Category II Nuclear Facility to a Radiological Facility. Non-destructive assay in general, gamma spectroscopy in particular, were found to be important tools in project management, work planning, and work control (''Expect the unexpected and confirm the expected''), minimizing worker dose, and resulted in significant safety improvements and operational efficiencies. Inventory reduction activities utilized gamma spectroscopy to identify and confirm isotopics of legacy inventory, ingrowth of daughter products and the presence of process impurities; quantify inventory; prioritize work activities for project management; and to supply information to satisfy shipper/receiver documentation requirements. D&D activities utilize in-situ gamma spectroscopy to identify and confirm isotopics of legacy contamination; quantify contamination levels and monitor the progress of decontamination efforts; and determine the point of diminishing returns in decontaminating enclosures and glove boxes containing high specific activity isotopes such as {sup 244}Cm and {sup 238}Pu. In-situ gamma spectroscopy provided quantitative comparisons of several decontamination techniques (e.g. TLC-free Stripcoat{trademark}, Radiac{trademark} wash, acid wash, scrubbing) and was used as a part of an iterative process to determine the appropriate level of decontamination and optimal cost to benefit ratio. Facility management followed a formal, rigorous process utilizing an independent, state certified, peer-reviewed gamma spectroscopy program, in conjunction with other characterization techniques

  5. Contingent post-closure plan, hazardous waste management units at selected maintenance facilities, US Army National Training Center, Fort Irwin, California

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    The National Training Center (NTC) at Fort Irwin, California, is a US Army training installation that provides tactical experience for battalion/task forces and squadrons in a mid- to high-intensity combat scenario. Through joint exercises with US Air Force and other services, the NTC also provides a data source for improvements of training doctrines, organization, and equipment. To meet the training and operational needs of the NTC, several maintenance facilities provide general and direct support for mechanical devices, equipment, and vehicles. Maintenance products used at these facilities include fuels, petroleum-based oils, lubricating grease, various degreasing solvents, antifreeze (ethylene glycol), transmission fluid, brake fluid, and hydraulic oil. Used or spent petroleum-based products generated at the maintenance facilities are temporarily accumulated in underground storage tanks (USTs), collected by the NTC hazardous waste management contractor (HAZCO), and stored at the Petroleum, Oil, and Lubricant (POL) Storage Facility, Building 630, until shipped off site to be recovered, reused, and/or reclaimed. Spent degreasing solvents and other hazardous wastes are containerized and stored on-base for up to 90 days at the NTC`s Hazardous Waste Storage Facility, Building 703. The US Environmental Protection Agency (EPA) performed an inspection and reviewed the hazardous waste management operations of the NTC. Inspections indicated that the NTC had violated one or more requirements of Subtitle C of the Resource Conservation and Recovery Act (RCRA) and as a result of these violations was issued a Notice of Noncompliance, Notice of Necessity for Conference, and Proposed Compliance Schedule (NON) dated October 13, 1989. The following post-closure plan is the compliance-based approach for the NTC to respond to the regulatory violations cited in the NON.

  6. Contingent post-closure plan, hazardous waste management units at selected maintenance facilities, US Army National Training Center, Fort Irwin, California

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    The National Training Center (NTC) at Fort Irwin, California, is a US Army training installation that provides tactical experience for battalion/task forces and squadrons in a mid- to high-intensity combat scenario. Through joint exercises with US Air Force and other services, the NTC also provides a data source for improvements of training doctrines, organization, and equipment. To meet the training and operational needs of the NTC, several maintenance facilities provide general and direct support for mechanical devices, equipment, and vehicles. Maintenance products used at these facilities include fuels, petroleum-based oils, lubricating grease, various degreasing solvents, antifreeze (ethylene glycol), transmission fluid, brake fluid, and hydraulic oil. Used or spent petroleum-based products generated at the maintenance facilities are temporarily accumulated in underground storage tanks (USTs), collected by the NTC hazardous waste management contractor (HAZCO), and stored at the Petroleum, Oil, and Lubricant (POL) Storage Facility, Building 630, until shipped off site to be recovered, reused, and/or reclaimed. Spent degreasing solvents and other hazardous wastes are containerized and stored on-base for up to 90 days at the NTC's Hazardous Waste Storage Facility, Building 703. The US Environmental Protection Agency (EPA) performed an inspection and reviewed the hazardous waste management operations of the NTC. Inspections indicated that the NTC had violated one or more requirements of Subtitle C of the Resource Conservation and Recovery Act (RCRA) and as a result of these violations was issued a Notice of Noncompliance, Notice of Necessity for Conference, and Proposed Compliance Schedule (NON) dated October 13, 1989. The following post-closure plan is the compliance-based approach for the NTC to respond to the regulatory violations cited in the NON.

  7. Facility effluent monitoring plan for the plutonium uranium extraction facility

    Energy Technology Data Exchange (ETDEWEB)

    Wiegand, D.L.

    1994-09-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.

  8. 48 CFR 970.3770 - Facilities management.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Facilities management. 970... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Facilities Management Contracting 970.3770 Facilities management....

  9. Facility effluent monitoring plan for 242-A evaporator facility

    Energy Technology Data Exchange (ETDEWEB)

    Crummel, G.M.; Gustavson, R.D.

    1995-02-01

    A facility effluent monitoring plan is required by the U.S. Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could affect employee or public safety or the environment. A facility effluent monitoring plan determination was performed during Calendar Year 1991 and the evaluation showed the need for a facility effluent monitoring plan. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-1. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated, as a minimum, every three years.

  10. Material Stabilization Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    SPEER, D.R.

    1999-09-01

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides.

  11. Upland Management Plan [Draft

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Upland Management Plan provides guidelines for the methods and tools to manage uplands on the Arrowwood National Wildlife Refuge to provide quality cover and...

  12. Cropland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this Cropland Management Plan is to describe cropland management activities at Shiawassee National Wildlife Refuge and provide the basis for future...

  13. Disaster planning: the past, present, and future concepts and principles of managing a surge of burn injured patients for those involved in hospital facility planning and preparedness.

    Science.gov (United States)

    Kearns, Randy D; Holmes, James H; Alson, Roy L; Cairns, Bruce A

    2014-01-01

    The 9/11 attacks reframed the narrative regarding disaster medicine. Bypass strategies have been replaced with absorption strategies and are more specifically described as "surge capacity." In the succeeding years, a consensus has coalesced around stratifying the surge capacity into three distinct tiers: conventional, contingency, and crisis surge capacities. For the purpose of this work, these three distinct tiers were adapted specifically to burn surge for disaster planning activities at hospitals where burn centers are not located. A review was conducted involving published plans, other related academic works, and findings from actual disasters as well as modeling. The aim was to create burn-specific definitions for surge capacity for hospitals where a burn center is not located. The three-tier consensus description of surge capacity is delineated in their respective stratifications by what will hereinafter be referred to as the three "S's"; staff, space, and supplies (also referred to as supplies, pharmaceuticals, and equipment). This effort also included the creation of a checklist for nonburn center hospitals to assist in their development of a burn surge plan. Patients with serious burn injuries should always be moved to and managed at burn centers, but during a medical disaster with significant numbers of burn injured patients, there may be impediments to meeting this goal. It may be necessary for burn injured patients to remain for hours in an outlying hospital until being moved to a burn center. This work was aimed at aiding local and regional hospitals in developing an extemporizing measure until their burn injured patients can be moved to and managed at a burn center(s).

  14. Legal regime of water management facilities

    Directory of Open Access Journals (Sweden)

    Salma Jožef

    2013-01-01

    Full Text Available The paper analyzes the legal regime of water management facilities in the light of Serbian, foreign and European law. Different divisions of water management facilities are carried out (to public and private ones, natural and artificial ones, etc., with determination of their legal relevance. Account is taken of the issue of protection from harmful effects of waters to such facilities, as well. The paper points also to rules on the water management facilities, from acts of planning, to individual administrative acts and measures for maintenance of required qualitative and quantitative condition of waters, depending on their purpose (general use or special, commercial use o waters. Albeit special rules on water management facilities exist, due to the natural interlocking between all the components of the environment (water, air and soil, a comprehensive approach is required. A reference is made to other basic principles of protection of water management facilities as well, such as the principle of prevention, principle of sustainable development and the principle "polluter pays". The last one represents the achievement of contemporary law, which deviates from the idea accepted in the second half of 20th century that supported the socialization of risk from harmful effects of waters.

  15. Knowledge Map of Facilities Management

    DEFF Research Database (Denmark)

    Nenonen, Suvi; Jensen, Per Anker; Lindahl, Göran

    2014-01-01

    in creating an inventory of knowledge (i.e. the knowledge base) and developing/improving the processes of knowledge sharing in research, education and practice. Theory Knowledge mapping is discussed in terms of knowledge management. The research is connected to knowledge mapping in the facilities management......Purpose This paper aims to draft a knowledge map of the fragmented and multidisciplinary research of and relevant to FM. Facilities management knowledge map is a tool for presenting what relevant data and knowledge, a.k.a. knowledge, resides in different disciplines. Knowledge mapping is a step...... profession, research and education. The knowledge map aims to contrast perspectives on how to map interdisciplinary research. Design/methodology/approach The Knowledge map is based on classification of 83 articles, including volume 2013 of Facilities (40 articles) and of Journal of Facilities Management (21...

  16. Underground storage tank management plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

  17. Natural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Green, T. [Brookhaven National Laboratory (BNL), Upton, NY (United States); Schwager, K. [Brookhaven National Laboratory (BNL), Upton, NY (United States)

    2016-10-01

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.

  18. A Checklist for Planning Community College Facilities.

    Science.gov (United States)

    Merlo, Frank P.

    It is noted that in any planning process for community colleges, physical facilities are only an adjunct to the instructional program, and any types of facilities that evolve should be based on the nature of the students, the curriculum, and the general philosophy and operation of the college. A list is presented as a suggested guide for questions…

  19. Facility effluent monitoring plan for the tank farms facilities

    Energy Technology Data Exchange (ETDEWEB)

    Bachand, D.D.; Crummel, G.M.

    1995-05-01

    A facility effluent monitoring plan is required by the US Department of Energy for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using specific guidelines. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum every three years.

  20. 40 CFR 35.917 - Facilities planning (step 1).

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Facilities planning (step 1). 35.917... Facilities planning (step 1). (a) Sections 35.917 through 35.917-9 establish the requirements for facilities plans. (b) Facilities planning consists of those necessary plans and studies which directly relate to...

  1. Facility effluent monitoring plan for the 325 Facility

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-31

    The Applied Chemistry Laboratory (325 Facility) houses radiochemistry research, radioanalytical service, radiochemical process development, and hazardous and mixed hazardous waste treatment activities. The laboratories and specialized facilities enable work ranging from that with nonradioactive materials to work with picogram to kilogram quantities of fissionable materials and up to megacurie quantities of other radionuclides. The special facilities include two shielded hot-cell areas that provide for process development or analytical chemistry work with highly radioactive materials, and a waste treatment facility for processing hazardous, mixed, low-level, and transuranic wastes generated by Pacific Northwest Laboratory. Radioactive material storage and usage occur throughout the facility and include a large number of isotopes. This material is in several forms, including solid, liquid, particulate, and gas. Some of these materials are also heated during testing which can produce vapors. The research activities have been assigned to the following activity designations: High-Level Hot Cell, Hazardous Waste Treatment Unit, Waste Form Development, Special Testing Projects, Chemical Process Development, Analytical Hot Cell, and Analytical Chemistry. The following summarizes the airborne and liquid effluents and the results of the Facility Effluent Monitoring Plan (FEMP) determination for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements.

  2. Wolf management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — A memorandum from the Assistant Region Director, Refuges and Wildlife to all U.S. Fish and Wildlife refuge managers regarding the public planning effort on wolf...

  3. Station Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The following plan is the result of a recent initiative in Region 5 to produce general management guidance based on stated objectives for individual field stations....

  4. Grassland Management Plan [Draft

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This grassland management plan is for Bear River Migratory Bird Refuge in Utah. It includes a summary of the refuge, special considerations for endangered species,...

  5. Fire Management Plan 1984

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan considers fire on Erie as a tool for management and as a potential problem to be dealt with. This document discusses environmental impacts and alternatives...

  6. Cropland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Union Slough National Wildlife Refuge Cropland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations...

  7. CLAIMS OF SUSTAINABLE FACILITIES MANAGEMENT

    DEFF Research Database (Denmark)

    Nielsen, Susanne Balslev

    Purpose: The purpose of the paper is to provide an overview of current practices within the emergent management discipline: Sustainable Facilities Management (SFM). Background: To develop a sustainable society, facilities managers must become change agents for sustainability in the built...... environment. Facilities Management (FM) is contributing to the environmental, social and economical problems, but can at the same time also be a part of the solution. However, to integrate sustainability in FM is still an emergent niche within FM, and the examples of SFM so far seems to come out of very...... understandings of SFM are identified which have different strategic approaches: • The incremental: Limit environmental impact from organisation activities • The radical: Towards a vision of a sustainable future • The transformative: Going beyond the organisation to establish new partnerships for co...

  8. CLAIMS OF SUSTAINABLE FACILITIES MANAGEMENT

    DEFF Research Database (Denmark)

    Nielsen, Susanne Balslev

    FM strategy and with the organisations general integration of sustainability as a value in core business. The general FM strategy and the role of sustainability in core business seem to be the most dominating factors for the possibilities for even starting to realise an SFM strategy. Three......Purpose: The purpose of the paper is to provide an overview of current practices within the emergent management discipline: Sustainable Facilities Management (SFM). Background: To develop a sustainable society, facilities managers must become change agents for sustainability in the built...... environment. Facilities Management (FM) is contributing to the environmental, social and economical problems, but can at the same time also be a part of the solution. However, to integrate sustainability in FM is still an emergent niche within FM, and the examples of SFM so far seems to come out of very...

  9. Data Management Plan

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Vogelsang, Stefan; Freudenberg, Peggy

    2015-01-01

    This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data.......This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data....

  10. TWRS safety management plan

    Energy Technology Data Exchange (ETDEWEB)

    Popielarczyk, R.S., Westinghouse Hanford

    1996-08-01

    The Tank Waste Remediation System (TWRS) Safety Management Program Plan for development, implementation and maintenance of the tank farm authorization basis is described. The plan includes activities and procedures for: (a) Updating the current Interim Safety Basis, (b) Development,implementation and maintenance of a Basis for Interim Operations, (c) Development, implementation and maintenance of the Final Safety Analyses Report, (d) Development and implementation of a TWRS information Management System for monitoring the authorization basis.

  11. Managing facilities in a Scandinavian manner:

    DEFF Research Database (Denmark)

    Elle, Morten; Engelmark, Jesper; Jørgensen, Bo

    2004-01-01

    Presents the aims and needs of research in facilities management (FM) at the section of Planning and Management of Building Processes at BYG*DTU. As the building stock in Denmark is rapidly increasing, socio-demographic developments implies profound changes in both the needs of inhabitants...... infrastructure within the mainstream FM field. There is an urgent need to address how society can best manage the growing (and decaying) building stock, to develop life-cycle rooted infrastructure and building design, and finally allow buildings to be appropriated by their current and future users....

  12. Facility effluent monitoring plan for the 324 Facility

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-11-01

    The 324 Facility [Waste Technology Engineering Laboratory] in the 300 Area primarily supports the research and development of radioactive and nonradioactive waste vitrification technologies, biological waste remediation technologies, spent nuclear fuel studies, waste mixing and transport studies, and tritium development programs. All of the above-mentioned programs deal with, and have the potential to, release hazardous and/or radioactive material. The potential for discharge would primarily result from (1) conducting research activities using the hazardous materials, (2) storing radionuclides and hazardous chemicals, and (3) waste accumulation and storage. This report summarizes the airborne and liquid effluents, and the results of the Facility Effluent Monitoring Plan (FEMP) determination for the facility. The complete monitoring plan includes characterizing effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements.

  13. Project summary plan for HTGR recycle reference facility

    Energy Technology Data Exchange (ETDEWEB)

    Baxter, B.J.

    1979-11-01

    A summary plan is introduced for completing conceptual definition of an HTGR Recycle Reference Facility (HRRF). The plan describes a generic project management concept, often referred to as the requirements approach to systems engineering. The plan begins with reference flow sheets and provides for the progressive evolution of HRRF requirements and definition through feasibility, preconceptual, and conceptual phases. The plan lays end-to-end all the important activities and elements to be treated during each phase of design. Identified activities and elements are further supported by technical guideline documents, which describe methodology, needed terminology, and where relevant a worked example.

  14. Waste Management Facilities Cost Information Report

    Energy Technology Data Exchange (ETDEWEB)

    Feizollahi, F.; Shropshire, D.

    1992-10-01

    The Waste Management Facility Cost Information (WMFCI) Report, commissioned by the US Department of Energy (DOE), develops planning life-cycle cost (PLCC) estimates for treatment, storage, and disposal facilities. This report contains PLCC estimates versus capacity for 26 different facility cost modules. A procedure to guide DOE and its contractor personnel in the use of estimating data is also provided. Estimates in the report apply to five distinctive waste streams: low-level waste, low-level mixed waste, alpha contaminated low-level waste, alpha contaminated low-level mixed waste, and transuranic waste. The report addresses five different treatment types: incineration, metal/melting and recovery, shredder/compaction, solidification, and vitrification. Data in this report allows the user to develop PLCC estimates for various waste management options.

  15. Waste Management Facilities Cost Information Report

    Energy Technology Data Exchange (ETDEWEB)

    Feizollahi, F.; Shropshire, D.

    1992-10-01

    The Waste Management Facility Cost Information (WMFCI) Report, commissioned by the US Department of Energy (DOE), develops planning life-cycle cost (PLCC) estimates for treatment, storage, and disposal facilities. This report contains PLCC estimates versus capacity for 26 different facility cost modules. A procedure to guide DOE and its contractor personnel in the use of estimating data is also provided. Estimates in the report apply to five distinctive waste streams: low-level waste, low-level mixed waste, alpha contaminated low-level waste, alpha contaminated low-level mixed waste, and transuranic waste. The report addresses five different treatment types: incineration, metal/melting and recovery, shredder/compaction, solidification, and vitrification. Data in this report allows the user to develop PLCC estimates for various waste management options.

  16. Solid waste management complex site development plan

    Energy Technology Data Exchange (ETDEWEB)

    Greager, T.M.

    1994-09-30

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated.

  17. Solid waste management complex site development plan

    Energy Technology Data Exchange (ETDEWEB)

    Greager, T.M.

    1994-09-30

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated.

  18. Long-Range Facilities - Plan

    Science.gov (United States)

    1981-07-31

    time for reviewing instructions, searching existing data sources , gathering and maintaining the data needed, and completing and reviewing the...sternwheeler “Mark Twain” for Disneyland and fabrication of eight 52 foot submarines for the Disneyland “Navy.” This was followed by fabrication of the masts...reconstruction. This long-range plan provides a baseline against which the funds required for reconstruction can be balanced against a definite structure

  19. Hanford Site waste tank farm facilities design reconstitution program plan

    Energy Technology Data Exchange (ETDEWEB)

    Vollert, F.R.

    1994-09-06

    Throughout the commercial nuclear industry the lack of design reconstitution programs prior to the mid 1980`s has resulted in inadequate documentation to support operating facilities configuration changes or safety evaluations. As a result, many utilities have completed or have ongoing design reconstitution programs and have discovered that without sufficient pre-planning their program can be potentially very expensive and may result in end-products inconsistent with the facility needs or expectations. A design reconstitution program plan is developed here for the Hanford waste tank farms facility as a consequence of the DOE Standard on operational configuration management. This design reconstitution plan provides for the recovery or regeneration of design requirements and basis, the compilation of Design Information Summaries, and a methodology to disposition items open for regeneration that were discovered during the development of Design Information Summaries. Implementation of this plan will culminate in an end-product of about 30 Design Information Summary documents. These documents will be developed to identify tank farms facility design requirements and design bases and thereby capture the technical baselines of the facility. This plan identifies the methodology necessary to systematically recover documents that are sources of design input information, and to evaluate and disposition open items or regeneration items discovered during the development of the Design Information Summaries or during the verification and validation processes. These development activities will be governed and implemented by three procedures and a guide that are to be developed as an outgrowth of this plan.

  20. Systems engineering management plans.

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez, Tamara S.

    2009-10-01

    The Systems Engineering Management Plan (SEMP) is a comprehensive and effective tool used to assist in the management of systems engineering efforts. It is intended to guide the work of all those involved in the project. The SEMP is comprised of three main sections: technical project planning and control, systems engineering process, and engineering specialty integration. The contents of each section must be tailored to the specific effort. A model outline and example SEMP are provided. The target audience is those who are familiar with the systems engineering approach and who have an interest in employing the SEMP as a tool for systems management. The goal of this document is to provide the reader with an appreciation for the use and importance of the SEMP, as well as provide a framework that can be used to create the management plan.

  1. Guidance for the design and management of a maintenance plan to assure safety and improve the predictability of a DOE nuclear irradiation facility. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Booth, R.S.; Kryter, R.C.; Shepard, R.L.; Smith, O.L. [Oak Ridge National Lab., TN (United States); Upadhyaya, B.R. [Univ. of Tennessee, Knoxville, TN (United States). Dept. of Nuclear Engineering; Rowan, W.J.

    1994-10-01

    A program is recommended for planning the maintenance of DOE nuclear facilities that will help safety and enhance availability throughout a facility`s life cycle. While investigating the requirements for maintenance activities, a major difference was identified between the strategy suitable for a conventional power reactor and one for a research reactor facility: the latter should provide a high degree of predicted availability (referred to hereafter as ``predictability``) to its users, whereas the former should maximize total energy production. These differing operating goals necessitate different maintenance strategies. A strategy for scheduling research reactor facility operation and shutdown for maintenance must balance safety, reliability,and predicted availability. The approach developed here is based on three major elements: (1) a probabilistic risk analysis of the balance between assured reliability and predictability (presented in Appendix C), (2) an assessment of the safety and operational impact of maintenance activities applied to various components of the facility, and (3) a data base of historical and operational information on the performance and requirements for maintenance of various components. These factors are integrated into a set of guidelines for designing a new highly maintainable facility, for preparing flexible schedules for improved maintenance of existing facilities, and for anticipating the maintenance required to extend the life of an aging facility. Although tailored to research reactor facilities, the methodology has broader applicability and may therefore be used to improved the maintenance of power reactors, particularly in anticipation of peak load demands.

  2. Types of Managed Care Plans

    Science.gov (United States)

    ... Size Email Print Share Types of Managed Care Plans Page Content Article Body ​Managed care plans have ... to any deductible you must meet. High Deductible Plans (HDP): HDPs, also known as consumer directed health ...

  3. Facility management in German hospitals.

    Science.gov (United States)

    Gudat, H

    2000-04-01

    Facility management and optimum building management offer for hospitals a chance to reduce costs and to increase quality, process sequences, employee motivation and customer satisfaction. Some years ago simple services such as cleaning, catering or laundry were outsourced. Now, German hospitals progress to more complex fields such as building and medical technology, clinical support processes such as pharmacy, central laboratory and sterilization, goods and logistics services.

  4. Managing EMC within healthcare facilities.

    Science.gov (United States)

    High, Damon

    2011-01-01

    Damon High, a consultant at international testing, certification, qualification, training, and consultancy services provider TUV Product Service, examines the issue of electromagnetic interference in hospitals, highlighting the areas that equipment suppliers and estates and facilities managers/healthcare engineers need to consider to ensure both the continuing safe, reliable operation of equipment, and compliance with the latest legislation.

  5. Facility Management's Role in Organizational Sustainability

    Science.gov (United States)

    Adams, Gregory K.

    2013-01-01

    Facility managers have questions about sustainability. How do an organization's physical facilities--its built environment--and the management of them, influence the sustainability of the organization or institution as a whole? How important is Facility Management (FM) to the overall sustainability profile of an organization? Facility managers…

  6. Facility Management's Role in Organizational Sustainability

    Science.gov (United States)

    Adams, Gregory K.

    2013-01-01

    Facility managers have questions about sustainability. How do an organization's physical facilities--its built environment--and the management of them, influence the sustainability of the organization or institution as a whole? How important is Facility Management (FM) to the overall sustainability profile of an organization? Facility managers…

  7. Data Management Plan

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Sørensen, Nils Lykke

    2016-01-01

    This document describes the Data Management Plan (DMP) (second version), relating to RIBuild WP8, deliverable D8.1. It draws the first lines for how data can be made findable, accessible, interoperable and re-usable after the project period.......This document describes the Data Management Plan (DMP) (second version), relating to RIBuild WP8, deliverable D8.1. It draws the first lines for how data can be made findable, accessible, interoperable and re-usable after the project period....

  8. Sewer System Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Robert C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-08-01

    A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Field Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan.

  9. Facility Effluent Monitoring Plan for the 3720 Building

    Energy Technology Data Exchange (ETDEWEB)

    Shields, K.D.; Ballinger, M.Y.

    1999-04-02

    This Facility Effluent Monitoring Plan (FEMP) has been prepared for the Environmental Science Laboratory (3720 Facility) at the Pacific Northwest National Laboratory (PNNL) to meet the requirements in DOE Order 5400.1, ''General Environmental Protection Programs'' This FEMP has been prepared for the 3720 Facility primarily because it has a major (potential to emit >0.1 mrem/yr) emission point for radionuclide air emissions according to the annual National Emission Standards for Hazardous Air Pollutants (NESHAP) assessment performed. This section summarizes the airborne and liquid effluents and the inventory based NESHAP assessment for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements. The 3720 Facility provides office and laboratory space for PNNL scientific and engineering staff conducting multidisciplinary research in the areas of materials characterization and testing and waste management. The facility is designed to accommodate the use of radioactive and hazardous materials to conduct these activities. Radioactive material storage and usage occur throughout the facility and include a large number of isotopes. This material is in several forms, including solid, liquid, and dispersible particulate. The facility is in the process of being vacated for shutdown, but is considered a Major Emission Point as of the date of this document approval.

  10. National Ignition Facility (NIF) FY2015 Facility Use Plan

    Energy Technology Data Exchange (ETDEWEB)

    Folta, P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wisoff, Jeff [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2014-12-18

    Major features of the FY2015 NIF Use Plan include: • Performing a record number of layered DT experiments with 28 planned compared with 15 in FY2014. Executing the first plutonium experiments on the NIF in support of the Science Campaigns. • Over 300 targets shots, a 57% increase compared to FY14. This is a stretch goal defined in the 120-Day Study document, and relies upon the success of many shot-rate improvement actions, as well as on the distribution of shot type selected by the users. While the Plan is consistent with this goal, the increased proportion of layered DT experiments described above reduces the margin against this goal. • Commissioning of initial ARC capability, which will support both SSP-HED and SSPICF programs. • Increase in days allocated to Discovery Science to a level that supports an ongoing program for academic use of NIF and an annual solicitation for new proposals. • Six Facility Maintenance and Reconfiguration (FM&R) periods totaling 30 days dedicated to major facility maintenance and modifications. • Utilization of the NIF Facility Advisory Schedule Committee (FASC) to provide stakeholder review and feedback on the NIF schedule. The Use Plan assumes a total FY2015 LLNL NIF Operations funding in MTE 10.7 of $229.465M and in MTE 10.3 of 47.0M. This Use Plan will be revised in the event of significant changes to the FY2015 funding or if NNSA provides FY2016 budget guidance significantly reduced compared to FY2015.

  11. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-12-01

    Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; waste characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references.

  12. Facility Effluent Monitoring Plan for Pacific Northwest National Laboratory Balance-of-Plant Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Ballinger, M.Y.; Shields, K.D.

    1999-04-02

    The Pacific Northwest National Laboratory (PNNL) operates a number of research and development (R and D) facilities for the Department of Energy on the Hanford Site. According to DOE Order 5400.1, a Facility Effluent Monitoring Plan is required for each site, facility, or process that uses, generates, releases, or manages significant pollutants or hazardous materials. Three of the R and D facilities: the 325, 331, and 3720 Buildings, are considered major emission points for radionuclide air sampling and thus individual Facility Effluent Monitoring Plans (FEMPs) have been developed for them. Because no definition of ''significant'' is provided in DOE Order 5400.1 or the accompanying regulatory guide DOE/EH-0173T, this FEMP was developed to describe monitoring requirements in the DOE-owned, PNNL-operated facilities that do not have individual FEMPs. The remainder of the DOE-owned, PNNL-operated facilities are referred to as Balance-of-Plant (BOP) facilities. Activities in the BOP facilities range from administrative to laboratory and pilot-scale R and D. R and D activities include both radioactive and chemical waste characterization, fluid dynamics research, mechanical property testing, dosimetry research, and molecular sciences. The mission and activities for individual buildings are described in the FEMP.

  13. Operational readiness: an integral part of the facility planning process.

    Science.gov (United States)

    Kidd, LeeAnne; Howe, Rob

    2014-01-01

    Large capital building projects benefit from an operational readiness strategy prior to new facility occupancy. St. Joseph's Healthcare used a structured approach for their readiness planning that included individual work plan meetings, tools for ensuring integration across programs and services and process improvement support to ensure a smooth transition. Over 1100 staff were oriented using a Train-the-Trainer model. Significant effort was required to co-ordinate the customized training, which involved "staffing up" to ensure sufficient resources for backfill. Operational readiness planning places additional demands on managers, requiring support and assistance from dedicated resources both prior to occupancy and several months post-move.

  14. National Ignition Facility project acquisition plan

    Energy Technology Data Exchange (ETDEWEB)

    Callaghan, R.W.

    1996-04-01

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertial Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.

  15. Facility information management system; Shisetsu joho kanri system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-01-10

    A facility management system (FMS) was developed as a tool for efficiently operating and managing building facilities and related equipment. The maintenance management data is designed to be collected through automatic formation of data base by using a work flow function and releasing the daily business from paper work. The data base thus formed can be retrieved and displayed by utilizing a network system. The plan view for construction facilities is made a minute plan comparable to the ground plan by taking in DXF type drawing data such as a completion drawing, making it a colored display for example to create an intuitive expression understandable at first sight. The plan is controlled by the level including equipment classification and is capable of superimposed display. Detailed management data is displayed by mouse clicking of registered icons, allowing required information to be readily taken out. (translated by NEDO)

  16. Federal facilities compliance act waste management

    Energy Technology Data Exchange (ETDEWEB)

    Bowers, J; Gates-Anderson, D; Hollister, R; Painter, S

    1999-07-06

    Site Treatment Plans (STPs) developed through the Federal Facilities Compliance Act pose many technical and administrative challenges. Legacy wastes managed under these plans require Land Disposal Restriction (LDR) compliance through treatment and ultimate disposal. Although capacity has been defined for most of the Department of Energy wastes, many waste streams require further characterization and many need additional treatment and handling beyond LDR criteria to be able to dispose of the waste. At Lawrence Livermore National Laboratory (LLNL), the Hazardous Waste Management Division has developed a comprehensive Legacy Waste Program. The program directs work to manage low level and mixed wastes to ensure compliance with nuclear facility rules and its STP. This paper provides a survey of work conducted on these wastes at LLNL. They include commercial waste treatment and disposal, diverse forms of characterization, inventory maintenance and reporting, on-site treatment, and treatability studies. These activities are conducted in an integrated fashion to meet schedules defined in the STP. The processes managing wastes are dynamic due to required integration of administrative, regulatory, and technical concerns spanning the gamut to insure safe proper disposal.

  17. Institutional management of core facilities during challenging financial times.

    Science.gov (United States)

    Haley, Rand

    2011-12-01

    The economic downturn is likely to have lasting effects on institutions of higher education, prioritizing proactive institutional leadership and planning. Although by design, core research facilities are more efficient and effective than supporting individual pieces of research equipment, cores can have significant underlying financial requirements and challenges. This paper explores several possible institutional approaches to managing core facilities during challenging financial times.

  18. 7 CFR 210.13 - Facilities management.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Facilities management. 210.13 Section 210.13... Participation § 210.13 Facilities management. Link to an amendment published at 74 FR 66216, Dec. 15, 2009. (a..., the added text is set forth as follows: § 210.13 Facilities management. (c) Food safety program....

  19. Region 7 Quality Management Plan

    Science.gov (United States)

    To document adherence to EPA Order 5360.1 A2, EPA requires each organizational unitto develop a quality management plan per the specifications in EPA Requirements for QualityManagement Plans, EPA QA R-2.

  20. Biohazardous waste management plan.

    Energy Technology Data Exchange (ETDEWEB)

    Lane, Todd W.

    2004-01-01

    This plan describes the process for managing non-medical biohazardous waste at Sandia National Laboratories California. It applies to operations at the Chemical and Radiation Detection Laboratory (CRDL), Building 968, and other biosafety level 1 or 2 activities at the site. It addresses the accumulation, storage, treatment and disposal of biohazardous waste and sharps waste. It also describes the procedures to comply with regulatory requirements and SNL policies applicable to non-medical biohazardous waste.

  1. Medical waste management plan.

    Energy Technology Data Exchange (ETDEWEB)

    Lane, Todd W.; VanderNoot, Victoria A.

    2004-12-01

    This plan describes the process for managing research generated medical waste at Sandia National Laboratories/California. It applies to operations at the Chemical and Radiation Detection Laboratory (CRDL), Building 968, and other biosafety level 1 or 2 activities at the site. It addresses the accumulation, storage, treatment and disposal of medical waste and sharps waste. It also describes the procedures to comply with regulatory requirements and SNL policies applicable to medical waste.

  2. Innovative Procurement and Partnerships in Facilities Management

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2011-01-01

    A major study of facilities management best practice covering 36 cases from the Nordic countries in Europe shows, that the most outstanding examples of innovation in FM are initiated from the demand side and involves new forms of procurement with long term contracts. This paper considers in depth...... is that the client allows the providers freedom to plan their activities. Thereby the providers can optimize the use of their productive capacity and utilize their competences with incentives to profit from such improvements. A major challenge is to balance the risks between the client and provider and to create...

  3. Facilities Management and Added Value

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2010-01-01

    Aim: This paper aims to present different models of the concept of the added value of Facilities Management (FM), including the FM Value Map, which forms the basis of research group in EuroFM, and to present some of the results of this research collaboration. Approach and methodology: The paper...... on the aimed output) and the internal resource based view (with a focus on the input from FM and RE). Good relationship management and building on trust shows to be equally important as delivering the agreed services. In order to measure the multi-dimensional components of adding value both qualitative...... is based on literature reviews of the most influential journals within the academic fields of FM, Corporate Real Estate Management and Business to Business Marketing and discussions between participants of the research group working on a further exploration and testing of the FM Value Map. Conclusions...

  4. Strategic Planning and Financial Management

    Science.gov (United States)

    Conneely, James F.

    2010-01-01

    Strong financial management is a strategy for strategic planning success in student affairs. It is crucial that student affairs professionals understand the necessity of linking their strategic planning with their financial management processes. An effective strategic planner needs strong financial management skills to implement the plan over…

  5. Strategic Planning and Financial Management

    Science.gov (United States)

    Conneely, James F.

    2010-01-01

    Strong financial management is a strategy for strategic planning success in student affairs. It is crucial that student affairs professionals understand the necessity of linking their strategic planning with their financial management processes. An effective strategic planner needs strong financial management skills to implement the plan over…

  6. Potential of Computerized Maintenance Management System in Facilities Management

    OpenAIRE

    Noor Farisya Azahar; Md Azree Othuman Mydin

    2014-01-01

    For some time it has been clear that managing buildings or estates has been carried out in the context of what has become known as facilities management. British Institute of Facilities Management defined facilities management is the integration of multi-disciplinary activities within the built environment and the management of their impact upon people and the workplace. Effective facilities management is vital to the success of an organisation by contributing to the deliver...

  7. 40 CFR 35.925-1 - Facilities planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Facilities planning. 35.925-1 Section... Facilities planning. That, if the award is for step 2, step 3, or step 2=3 grant assistance, the facilities planning requirements in § 35.917 et seq. have been met. ...

  8. NIF conventional facilities construction health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    Benjamin, D W

    1998-05-14

    The purpose of this Plan is to outline the minimum health and safety requirements to which all participating Lawrence Livermore National Laboratory (LLNL) and non-LLNL employees (excluding National Ignition Facility [NIF] specific contractors and subcontractors covered under the construction subcontract packages (e.g., CSP-9)-see Construction Safety Program for the National Ignition Facility [CSP] Section I.B. ''NIF Construction Contractors and Subcontractors'' for specifics) shall adhere to for preventing job-related injuries and illnesses during Conventional Facilities construction activities at the NIF Project. For the purpose of this Plan, the term ''LLNL and non-LLNL employees'' includes LLNL employees, LLNL Plant Operations staff and their contractors, supplemental labor, contract labor, labor-only contractors, vendors, DOE representatives, personnel matrixed/assigned from other National Laboratories, participating guests, and others such as visitors, students, consultants etc., performing on-site work or services in support of the NIF Project. Based upon an activity level determination explained in Section 1.2.18, in this document, these organizations or individuals may be required by site management to prepare their own NIF site-specific safety plan. LLNL employees will normally not be expected to prepare a site-specific safety plan. This Plan also outlines job-specific exposures and construction site safety activities with which LLNL and non-LLNL employees shall comply.

  9. Morris Wetland Management District Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Morris Wetland Management District Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  10. Bison and Elk Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Bison and Elk Management Plan is to provide managers with goals, objectives, and strategies for managing bison and elk on the National Elk Refuge...

  11. Kulm Wetland Management District Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this habitat management plan (HMP) is to provide a strategic plan for consistently and effectively protecting, acquiring, enhancing, restoring, and...

  12. Design Integration of Facilities Management

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2009-01-01

    . The paper identifies the aspects of FM that should be considered during the different stages of design. A typology of knowledge transfer from building operation to building design is presented based on a combination of knowledge push from building operation and knowledge pull from building design....... Strategies, methods and barriers for the transfer and integration of operational knowledge into the design process are discussed. Multiple strategies are needed to improve the integration of FM in design. Building clients must take on a leading role in defining and setting up requirements and procedures....... Involvement of professional facilities managers in the design process is an obvious strategy, but increased competences are needed among building clients, designers and the operational staff. More codification of operational knowledge is also needed, for instance in IT systems. The paper is based...

  13. Waste sampling and characterization facility (WSCF) maintenance implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Heinemann, J.L.

    1997-08-13

    This Maintenance Implementation Plan (MIP) is written to satisfy the requirements of the US Department of Energy (DOE) Order 4330.4B, Maintenance Management Program that specifies the general policy and objectives for the establishment of the DOE controlled maintenance programs. These programs provide for the management and performance of cost effective maintenance and repair of the DOE property, which includes facilities. This document outlines maintenance activities associated with the facilities operated by Waste Management Hanford, Inc. (WMH). The objective of this MIP is to provide baseline information for the control and execution of WMH Facility Maintenance activities relative to the requirements of Order 4330.4B, assessment of the WMH maintenance programs, and actions necessary to maintain compliance with the Order. Section 2.0 summarizes the history, mission and description of the WMH facilities. Section 3.0 describes maintenance scope and requirements, and outlines the overall strategy for implementing the maintenance program. Specific elements of DOE Order 4330.4B are addressed in Section 4.0, listing the objective of each element, a discussion of the WMH compliance methodology, and current implementation requirements with references to WMH and HNF policies and procedures. Section 5.0 addresses deviations from policy requirements, and Section 6.0 is a schedule for specific improvements in support of this MIP.

  14. Facility Safety Plan B360 Complex CMLS-411r0

    Energy Technology Data Exchange (ETDEWEB)

    Cooper, G

    2007-01-08

    Lawrence Livermore National Laboratory's (LLNL) Environmental, Safety and Health (ES&H) policy is that all operations must be planned and performed safely for the protection of workers, the public, the environment, and limit possible loss to property, facilities and equipment assigned to this directorate. In addition to observing LLNL policies contained in the ''Environment, Safety, and Health (ES&H) Manual'', LLNL workers will comply with applicable federal, state, and local regulations when conducting any activity that the Chemistry, Materials and Life Sciences (CMLS) Directorate has managerial control or oversight. Management has determined that the safety controls specified within this Facility Safety Plan (FSP) must also be followed to ensure that the operation is successfully performed efficiently and safely within this facility. Any operations conducted in this Complex that involve activities not commonly performed by the public require an Integration Work Sheet (IWS) or IWS/Safety Plan (IWS/SP) that specifically assesses the responsibilities, hazards and controls to conduct the operation safely. Everyone who enters this area (including students, workers, visitors, and consultants) must follow the applicable requirements in this FSP. Each person is expected to protect himself/herself and others from injury or illness. Regular facility occupants are expected to guide and govern visitors and assist new or temporary occupants in understanding and following this plan. When there are any doubts regarding the safety of any phase of work, workers and others will check with the facility manager. Changes to this FSP will be approved by the Facility Associate Director (AD). This will undergo triennial review to establish, at a minimum, that its contents are appropriate and adequate for current operations. The Hazards Control ES&H Team assists management in instituting and maintaining a minimum-risk and environmentally sound work environment

  15. Accelerated radioactive nuclear beams: Existing and planned facilities

    Energy Technology Data Exchange (ETDEWEB)

    Nitschke, J.M.

    1992-07-01

    An over-view of existing and planned radioactive nuclear beam facilities world-wide. Two types of production methods are distinguished: projectile fragmentation and the on-line isotope separator (ISOL) method. While most of the projectile fragmentation facilities are already in operation, almost all the ISOL-based facilities are in still the planning stage.

  16. Fast Flux Test Facility (FFTF) standby plan

    Energy Technology Data Exchange (ETDEWEB)

    Hulvey, R.K.

    1997-03-06

    The FFTF Standby Plan, Revision 0, provides changes to the major elements and project baselines to maintain the FFTF plant in a standby condition and to continue washing sodium from irradiated reactor fuel. The Plan is consistent with the Memorandum of Decision approved by the Secretary of Energy on January 17, 1997, which directed that FFTF be maintained in a standby condition to permit the Department to make a decision on whether the facility should play a future role in the Department of Energy`s dual track tritium production strategy. This decision would be made in parallel with the intended December 1998 decision on the selection of the primary, long- term source of tritium. This also allows the Department to review the economic and technical feasibility of using the FFTF to produce isotopes for the medical community. Formal direction has been received from DOE-RL and Fluor 2020 Daniel Hanford to implement the FFTF standby decision. The objective of the Plan is maintain the condition of the FFTF systems, equipment and personnel to preserve the option for plant restart within three and one-half years of a decision to restart, while continuing deactivation work which is consistent with the standby mode.

  17. 1988 Annual water management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Ruby Lake NWR 1987 Annual Water Management Report 1988 Annual Water Management Plan. Includes 1987 weather summary, water availability forecast, summary of 1987...

  18. 105-DR Large Sodium Fire Facility closure plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The Hanford Site, located northwest of the city of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials, and activities associated with nuclear energy development. The 105-DR Large Sodium Fire Facility (LSFF), which was in operation from about 1972 to 1986, was a research laboratory that occupied the former ventilation supply room on the southwest side of the 105-DR Reactor facility. The LSFF was established to provide a means of investigating fire and safety aspects associated with large sodium or other metal alkali fires in the liquid metal fast breeder reactor (LMFBR) facilities. The 105-DR Reactor facility was designed and built in the 1950`s and is located in the 100-D Area of the Hanford Site. The building housed the 105-DR defense reactor, which was shut down in 1964. The LSFF was initially used only for engineering-scale alkali metal reaction studies. In addition, the Fusion Safety Support Studies program sponsored intermediate-size safety reaction tests in the LSFF with lithium and lithium lead compounds. The facility has also been used to store and treat alkali metal waste, therefore the LSFF is subject to the regulatory requirements for the storage and treatment of dangerous waste. Closure will be conducted pursuant to the requirements of the Washington Administrative Code (WAC) 173-303-610. This closure plan presents a description of the facility, the history of waste managed, and the procedures that will be followed to close the LSFF as an Alkali Metal Treatment Facility. No future use of the LSFF is expected.

  19. Adaptive management: a paradigm for remediation of public facilities

    Energy Technology Data Exchange (ETDEWEB)

    Janecky, David R [Los Alamos National Laboratory; Whicker, Jeffrey J [Los Alamos National Laboratory; Doerr, Ted B [NON LANL

    2009-01-01

    Public facility restoration planning traditionally focused on response to natural disasters and hazardous materials accidental releases. These plans now need to integrate response to terrorist actions. Therefore, plans must address a wide range of potential vulnerabilities. Similar types of broad remediation planning are needed for restoration of waste and hazardous material handling areas and facilities. There are strong similarities in damage results and remediation activities between unintentional and terrorist actions; however, the uncertainties associated with terrorist actions result in a re-evaluation of approaches to planning. Restoration of public facilities following a release of a hazardous material is inherently far more complex than in confined industrial settings and has many unique technical, economic, social, and political challenges. Therefore, they arguably involve a superset of drivers, concerns and public agencies compared to other restoration efforts. This superset of conditions increases complexity of interactions, reduces our knowledge of the initial conditions, and even condenses the timeline for restoration response. Therefore, evaluations of alternative restoration management approaches developed for responding to terrorist actions provide useful knowledge for large, complex waste management projects. Whereas present planning documents have substantial linearity in their organization, the 'adaptive management' paradigm provides a constructive parallel operations paradigm for restoration of facilities that anticipates and plans for uncertainty, multiple/simUltaneous public agency actions, and stakeholder participation. Adaptive management grew out of the need to manage and restore natural resources in highly complex and changing environments with limited knowledge about causal relationships and responses to restoration actions. Similarities between natural resource management and restoration of a facility and surrounding area

  20. TWRS Configuration management program plan

    Energy Technology Data Exchange (ETDEWEB)

    Vann, J.M.

    1996-06-03

    The TWRS Configuration Management Program Plan (CMPP) integrates technical and administrative controls to establish and maintain consistency among requirements, product configuration, and product information for TWRS products during all life cycle phases. This CMPP will be used by TWRS management and configuration management personnel to establish and manage the technical and integrated baselines and controls and status changes to those baselines.

  1. Smart facility location planning using GIS technology & facility provision standards for pro-active planning of social facilities

    CSIR Research Space (South Africa)

    Green, Cheri

    2016-08-01

    Full Text Available and Industrial Research SOUTH AFRICA 2 © CSIR 2016 www.csir.co.za Structure of presentation • Key informants & objectives • Linking Accessibility planning; Planning Support Systems and the Smart City concept • Approach & provision... of life, with a wise management of natural resources, through participatory governance” Caragllui 2011 Planning Support Systems (PSS) can be defined as geo-information technology...

  2. Sites Requiring Facility Response Plans, Geographic NAD83, EPA (2006) [facility_response_plan_sites_la_EPA_2007

    Data.gov (United States)

    Louisiana Geographic Information Center — Locations of facilities in Louisiana requiring Oil Pollution Act (OPA) Facility Response Plans (FRP). The dataset was provided by the Region 6 OSCARS program....

  3. Introducing Urban Cultural Heritage Management into Urban Planning Management

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    <正>1. Concept comparison of urban cultural heritage management and urban planning management 1.1 Urban cultural heritage managementUrban cultural heritage management is an important component of cultural heritage management which is a systematic conser-vation to maintain the cultural value of cul-tural heritages so as to meet the enjoyment demand of the current or future generations. At present, the cultural heritage conserva-tion principles have been defined by many worldwide laws or charters, such as the Venice Charter of ICOMOS, the UNESCO World Heritage Convention, etc., and have been brought into legislation or policies in many countries. The fi nal goal of urban cul-tural heritage management is to find a real sustainable approach to manage heritages, which could benefit the heritages them-selves, the heritage managers and the local communities as well. Cultural heritage man-agement includes the management of urban cultural heritages, that of natural heritages in non-urban areas and that of intangible cultural heritages.1.2 Urban planning managementUrban planning management is a type of urban management. From the practical viewpoint, urban management should be an overall management which includes urban planning management, urban infrastructure and public facility management, urban en-vironment and public order management, etc., takes urban infrastructures and public resources as management object, and ischaracterized by the goal of exerting the comprehensive effects of economy, society and environment. While from the techni-cal viewpoint, urban planning management refers to the planning management executed by urban governments based on the relevant laws and regulations, including the manage-ment of urban land-use and that of different types of constructions. It actually means the organizing, guiding, controlling and coordinating process focusing on different construction projects in cities. The urban cultural heritage mentioned here includes all the physical

  4. Dahomey Plantation Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Plan describing timber, wildlife and recreational assessments and assoicated development costs of the Dahomey Plantion timberlands. Plan details existinig forest...

  5. NSTX: Facility/Research Highlights and Near Term Facility Plans

    Energy Technology Data Exchange (ETDEWEB)

    M. Ono

    2008-11-19

    The National Spherical Torus Experiment (NSTX) is a collaborative mega-ampere-class spherical torus research facility with high power heating and current drive systems and the state-of-the-art comprehensive diagnostics. For the 2008 experimental campaign, the high harmonic fast wave (HHFW) heating efficiency in deuterium improved significantly with lithium evaporation and produced a record central Te of 5 keV. The HHFW heating of NBI-heated discharges was also demonstrated for the first time with lithium application. The EBW emission in H-mode was also improved dramatically with lithium which was shown to be attributable to reduced edge collisional absorption. Newly installed FIDA energetic particle diagnostic measured significant transport of energetic ions associated with TAE avalanche as well as n=1 kink activities. A full 75 channel poloidal CHERS system is now operational yielding tantalizing initial results. In the near term, major upgrade activities include a liquid-lithium divertor target to achieve lower collisionality regime, the HHFW antenna upgrades to double its power handling capability in H-mode, and a beam-emission spectroscopy diagnostic to extend the localized turbulence measurements toward the ion gyro-radius scale from the present concentration on the electron gyro-radius scale. For the longer term, a new center stack to significantly expand the plasma operating parameters is planned along with a second NBI system to double the NBI heating and CD power and provide current profile control. These upgrades will enable NSTX to explore fully non-inductive operations over a much expanded plasma parameter space in terms of higher plasma temperature and lower collisionality, thereby significantly reducing the physics parameter gap between the present NSTX and the projected next-step ST experiments.

  6. 303-K Storage Facility closure plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-15

    Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 303-K Storage Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 303-K Storage Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 303-K Storage Facility, the history of materials and waste managed, and the procedures that will be followed to close the 303-K Storage Facility. The 303-K Storage Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.

  7. Strategies for healthcare facilities, construction, and real estate management.

    Science.gov (United States)

    Lee, James G

    2012-05-01

    Adventist HealthCare offers the following lessons learned in improving the value of healthcare facilities, construction, and real estate management: Use an integrated approach. Ensure that the objectives of the approach align the hospital or health system's mission and values. Embrace innovation. Develop a plan that applies to the whole organization, rather than specific business units. Ensure commitment of senior leaders.

  8. Landfill gas management facilities design guidelines

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-03-15

    In British Columbia, municipal solid waste landfills generate over 1000 tonnes of methane per year; landfill gas management facilities are required to improve the environmental performance of solid waste landfills. The aim of this document, developed by the British Columbia Ministry of the Environment, is to provide guidance for the design, installation, and operation of landfill gas management facilities to address odor and pollutant emissions issues and also address health and safety issues. A review of technical experience and best practices in landfill gas management facilities was carried out, as was as a review of existing regulations related to landfill gas management all over the world. This paper provides useful information to landfill owners, operators, and other professionals for the design of landfill gas management facilities which meet the requirements of landfill gas management regulations.

  9. Waste Management Program management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

  10. Facility Planning for Physical Education, Recreation, and Athletics.

    Science.gov (United States)

    Flynn, Richard B., Ed.

    This publication reflects the composite knowledge of many professionals on the topic of the planning and construction of facilities for athletics, physical education, and recreation. The text is organized into nine chapters: (1) "Facility Planning Process: Factors To Consider" (H. R. White and J. D. Karabetsos); (2) "Indoor…

  11. Management Plan: Parts I & II

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Squaw Creek National Wildlife Refuge Management Plan guides the long-range development of the Refuge by identifying and integrating appropriate habitats,...

  12. Fishery Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — A plan stating the slot limits and other fishing regulations on Noxubee National Wildlife Refuge. The slot limits were put in place to encourage removal of excessive...

  13. Managing Changes in Building Plans.

    Science.gov (United States)

    Schoolhouse of Quality, 2000

    2000-01-01

    Examines why school building plans get modified, how it affects the new school, and what can be done to plan for it. The role of the architect in managing change and use of a contingency fund are discussed as are the five types of changes that can happen and how they should be paid for. (GR)

  14. Service quality for facilities management in hospitals

    CERN Document Server

    Sui Pheng, Low

    2016-01-01

    This book examines the Facilities Management (FM) of hospitals and healthcare facilities, which are among the most complex, costly and challenging kind of buildings to manage. It presents and evaluates the FM service quality standards in Singapore’s hospitals from the patient’s perspective, and provides recommendations on how to successfully improve FM service quality and achieve higher patient satisfaction. The book also features valuable supplementary materials, including a checklist of 32 key factors for successful facilities management and another checklist of 24 service attributes for hospitals to achieve desirable service quality in connection with facilities management. The book adopts a unique approach of combining service quality and quality theory to provide a more holistic view of how FM service quality can be achieved in hospitals. It also integrates three instruments, namely the SERVQUAL model, the Kano model and the QFD model to yield empirical results from surveys for implementation in hosp...

  15. Location - Managed Facility - St. Paul District (MVP)

    Data.gov (United States)

    Army Corps of Engineers, Department of the Army, Department of Defense — St. Paul District - US Army Corps of Engineers Managed Facility locations. District headquarters, Natural Resource, Recreation, Lock and Dam, and Regulatory offices...

  16. Standard Guide for Preparing Characterization Plans for Decommissioning Nuclear Facilities

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2009-01-01

    1.1 This standard guide applies to developing nuclear facility characterization plans to define the type, magnitude, location, and extent of radiological and chemical contamination within the facility to allow decommissioning planning. This guide amplifies guidance regarding facility characterization indicated in ASTM Standard E 1281 on Nuclear Facility Decommissioning Plans. This guide does not address the methodology necessary to release a facility or site for unconditional use. This guide specifically addresses: 1.1.1 the data quality objective for characterization as an initial step in decommissioning planning. 1.1.2 sampling methods, 1.1.3 the logic involved (statistical design) to ensure adequate characterization for decommissioning purposes; and 1.1.4 essential documentation of the characterization information. 1.2 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate saf...

  17. Nevada Test Site Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

  18. National NIF Diagnostic Program Interim Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Warner, B

    2002-04-25

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  19. Antenna Test Facility (ATF): User Test Planning Guide

    Science.gov (United States)

    Lin, Greg

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ATF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  20. Vibration and Acoustic Test Facility (VATF): User Test Planning Guide

    Science.gov (United States)

    Fantasia, Peter M.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the VATF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  1. Planning and Designing Facilities. Facility Design and Development--Part 1

    Science.gov (United States)

    Hypes, Michael G.

    2006-01-01

    Before one begins the planning process for a new facility, it is important to determine if there is a need for a new facility. The demand for a new facility can be drawn from increases in the number of users, the type of users, and the type of events to be conducted in the facility. A feasibility study should be conducted to analyze the legal…

  2. How can facility managers add value?

    DEFF Research Database (Denmark)

    Jensen, Per Anker; van der Voordt, Theo

    2015-01-01

    Recent years have seen a growing interest in the concept of added value of facilities management (FM) and corporate real estate management (CREM), and how to attain and measure it. There is a wide variety of definitions in use, and recognition of different types of added value, such as user value......, customer value, financial value, environmental value and relationship value....

  3. Daily storage management of hydroelectric facilities

    NARCIS (Netherlands)

    Chappin, E.J.L.; Ferrero, M.; Lazzeroni, P.; Lukszo, Z.; Olivero, M.; Repetto, M.

    2012-01-01

    This work presents a management procedure for hydroelectric facilities with daily storage. The water storage gives an additional degree of freedom allowing to shift in time power production when it is more convenient and to work at the maximum efficiency of hydraulic turbine. The management is optim

  4. The strategic facilities management organisation in housing

    DEFF Research Database (Denmark)

    Nielsen, Susanne Balslev; Jensen, Per Anker; Jensen, Jesper Ole

    2012-01-01

    Two houses in the same street can be built in the same year, they can look the same, and still they might provide very different support for sustainable living. This article points to the Strategic Facilities Management Organisation (SFMO) as the most important concept, to understand and manage...... literature on sustainable facilities management, where it fills a gap as it deals with housing and strategic FM. Intended readers are those interested in housing administration and especially the transition of existing housing into more sustainable housing. Intended readers include building owners, policy...

  5. XML Based Scientific Data Management Facility

    Science.gov (United States)

    Mehrotra, P.; Zubair, M.; Bushnell, Dennis M. (Technical Monitor)

    2002-01-01

    The World Wide Web consortium has developed an Extensible Markup Language (XML) to support the building of better information management infrastructures. The scientific computing community realizing the benefits of XML has designed markup languages for scientific data. In this paper, we propose a XML based scientific data management ,facility, XDMF. The project is motivated by the fact that even though a lot of scientific data is being generated, it is not being shared because of lack of standards and infrastructure support for discovering and transforming the data. The proposed data management facility can be used to discover the scientific data itself, the transformation functions, and also for applying the required transformations. We have built a prototype system of the proposed data management facility that can work on different platforms. We have implemented the system using Java, and Apache XSLT engine Xalan. To support remote data and transformation functions, we had to extend the XSLT specification and the Xalan package.

  6. The strategic facilities management organisation in housing

    DEFF Research Database (Denmark)

    Nielsen, Susanne Balslev; Jensen, Per Anker; Jensen, Jesper Ole

    2012-01-01

    Two houses in the same street can be built in the same year, they can look the same, and still they might provide very different support for sustainable living. This article points to the Strategic Facilities Management Organisation (SFMO) as the most important concept, to understand and manage...... implementation of sustainable facilities management in housing administration. The concept provides a frame for understanding the roles and relations of tenants, owners, administrators and operators. The paper is based on a Danish research project on environmentally sound building operation including literature...... literature on sustainable facilities management, where it fills a gap as it deals with housing and strategic FM. Intended readers are those interested in housing administration and especially the transition of existing housing into more sustainable housing. Intended readers include building owners, policy...

  7. HABITAT MANAGEMENT PLAN, INTEGRATED PEST MANAGEMENT PLAN, AND VISITOR SERVICES PLAN FOR SAM D. HAMILTON NOXUBEE NATIONAL WILDLIFE REFUGE

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document contains 3 major plans including the Habitat Management Plan, the Integrated Pest Management Plan and the Visitor Services Plan. These plans provide...

  8. Automated survey of 8000 plan checks at eight facilities.

    Science.gov (United States)

    Halabi, Tarek; Lu, Hsiao-Ming; Bernard, Damian A; Chu, James C H; Kirk, Michael C; Hamilton, Russell J; Lei, Yu; Driewer, Joseph

    2016-09-01

    To identify policy and system related weaknesses in treatment planning and plan check work-flows. The authors' web deployed plan check automation solution, PlanCheck, which works with all major planning and record and verify systems (demonstrated here for mosaiq only), allows them to compute violation rates for a large number of plan checks across many facilities without requiring the manual data entry involved with incident filings. Workflows and failure modes are heavily influenced by the type of record and verify system used. Rather than tackle multiple record and verify systems at once, the authors restricted the present survey to mosaiq facilities. Violations were investigated by sending inquiries to physicists running the program. Frequent violations included inadequate tracking in the record and verify system of total and prescription doses. Infrequent violations included incorrect setting of patient orientation in the record and verify system. Peaks in the distribution, over facilities, of violation frequencies pointed to suboptimal policies at some of these facilities. Correspondence with physicists often revealed incomplete knowledge of settings at their facility necessary to perform thorough plan checks. The survey leads to the identification of specific and important policy and system deficiencies that include: suboptimal timing of initial plan checks, lack of communication or agreement on conventions surrounding prescription definitions, and lack of automation in the transfer of some parameters.

  9. National Ignition Facility (NIF) operations procedures plan

    Energy Technology Data Exchange (ETDEWEB)

    Mantrom, D.

    1998-05-06

    The purpose of this Operations Procedures Plan is to establish a standard procedure which outlines how NIF Operations procedures will be developed (i.e , written, edited, reviewed, approved, published, revised) and accessed by the NIF Operations staff who must use procedures in order to accomplish their tasks. In addition, this Plan is designed to provide a guide to the NIF Project staff to assist them in planning and writing procedures. Also, resource and scheduling information is provided.

  10. Configuration Management Maturity in Scientific Facilities

    Directory of Open Access Journals (Sweden)

    Masoud Niknam

    2013-12-01

    Full Text Available Since the effectiveness of the development and operation of scientific facilities (especially those presenting specific hazards, such as ionizing radiations relies heavily on state of the art practices, such as systems engineering and product lifecycle management, configuration management (CM is becoming a key management process. However, while some maturity models exist to assess the degree of the implementation and effectiveness of many management processes, such as project management or systems engineering, there is no specific framework available to assess the degree of maturity of an organization towards CM. This paper focuses on revealing the important maturity dimensions and levels for CM as a means towards developing a CM maturity model.

  11. A reservoir management plan

    Energy Technology Data Exchange (ETDEWEB)

    Allis, R.G.

    1989-06-16

    There are numerous documented cases of extraction of fluids from the ground causing surface subsidence. The cases include groundwater, oil and gas, as well as geothermal fluid withdrawal. A recent comprehensive review of all types of man-induced land subsidence was published by the Geological Survey of America. At the early stages of a geothermal power development project it is standard practice in most countries for an environmental impact report to be required. The possibility of geothermal subsidence has to be addressed, and usually it falls on the geophysicists and/or geologists to make some predictions. The advice given is vital for planning the power plant location and the borefield pipe and drain layout. It is not so much the vertical settlement that occurs with subsidence but the accompanying horizontal ground strains that can do the most damage to any man-made structure.

  12. GUIDE FOR PLANNING COMMUNITY COLLEGE FACILITIES.

    Science.gov (United States)

    MERLO, FRANK P.; WALLING, W. DONALD

    DISCUSSION OF THE PLACE OF PLANNING IN THE DEVELOPMENT OF AN EDUCATIONAL ENVIRONMENT IS FOLLOWED BY CONSIDERATION OF FACTORS RELATED TO SITE (LOCATION, SIZE, MASTER PLANNING, PHYSICAL PROPERTIES, SHAPE, ZONING, PARKING, LIGHTING, ROADS AND WALKS), BUILDINGS (THE BASIC BUILDINGS, CALCULATION OF SPACE NEEDS, STUDENT CAPACITIES, LOCATION ON THE SITE,…

  13. Potential of Computerized Maintenance Management System in Facilities Management

    Directory of Open Access Journals (Sweden)

    Noor Farisya Azahar

    2014-07-01

    Full Text Available For some time it has been clear that managing buildings or estates has been carried out in the context of what has become known as facilities management. British Institute of Facilities Management defined facilities management is the integration of multi-disciplinary activities within the built environment and the management of their impact upon people and the workplace. Effective facilities management is vital to the success of an organisation by contributing to the delivery of its strategic and operational objectives. Maintenance of buildings should be given serious attention before (stage design, during and after a building is completed. But total involvement in building maintenance is after the building is completed and during its operations. Residents of and property owners require their building to look attractive, durable and have a peaceful indoor environment and efficient. The objective of the maintenance management system is to stream line the vast maintenance information system to improve the productivity of an industrial plant. a good maintenance management system makes equipment and facilities available. This paper will discuss the fundamental steps of maintenance management program and Computerized Maintenance Management System (CMMS

  14. Mississippi Sandhill Crane NWR Forest Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Mississippi Sandhill Crane NWR Forest Management Plan is a general plan which outlines the Refuge management objectives, forest description, forest management...

  15. Forest Management Plan : Necedah National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Necedah NWR Forest Management Plan is a general plan which outlines the Refuge management objectives, forest description, forest management objectives,...

  16. Forest Management Plan : Eufaula National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Eufaula National Wildlife Refuge Forest Management Plan is a general plan which outlines the Refuge management objectives, forest description, forest management...

  17. Forest Management Plan Hatchie National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Hatchie National Wildlife Refuge Forest Management Plan is a general plan which outlines the Refuge management objectives, forest description, forest management...

  18. The impact of facility audits, evaluation reports and incentives on motivation and supply management among family planning service providers: an interventional study in two districts in Maputo Province, Mozambique.

    Science.gov (United States)

    Vermandere, Heleen; Galle, Anna; Griffin, Sally; de Melo, Málica; Machaieie, Lino; Van Braeckel, Dirk; Degomme, Olivier

    2017-05-02

    Good progress is being made towards universal access to contraceptives, however stock-outs still jeopardize progress. A seldom considered but important building block in optimizing supply management is the degree to which health workers feel motivated and responsible for monitoring supply. We explored how and to what extent motivation can be improved, and the impact this can have on avoiding stock-outs. Fifteen health facilities in Maputo Province, Mozambique, were divided into 3 groups (2 intervention groups and 1 control), and 10 monthly audits were implemented in each of these 15 facilities to collect data through examination of stock cards and stock-counts of 6 contraceptives. Based on these audits, the 2 intervention groups received a monthly evaluation report reflecting the quality of their supply management. One of these 2 groups was also awarded material incentives conditional on their performance. A Wilcoxon-Mann Whitney test was used to detect differences between the groups in the average number of stocked-out centres, while changes over time were verified through applying a Friedman test. Additionally, staff motivation was measured through interviewing health care providers of all centres at baseline, and after 5 and 10 months. To detect differences between the groups and changes over time, a Kruskal Wallis and a Wilcoxon signed-rank test were applied, respectively. Motivation reported by providers (n = 55, n = 40 and n = 39 at baseline, 1st and 2nd follow-up respectively) was high in all groups, during all rounds, and did not change over time. Facilities in the intervention groups had better supply management results (including less stock-outs) during the entire intervention period compared with those in the control group, but the difference was only significant for the group receiving both material incentives and a monthly evaluation. However, our data also suggest that supply management also improved in control facilities, receiving

  19. Total Quality Management Implementation Plan.

    Science.gov (United States)

    1989-06-01

    E 14. SUBJECT TERMS 15. NUMBER OF PAGES TOM ( Total Quality Management ), Continuous Process Improvement,_________ Depot Operations, Supply Support 16... Quality Management Implementation Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION Defense General...Reduction PrOtect (O704.Ot8SL Wasilngton, OC 20503j. .EPORT DATE 3. REPORT TYPE AND DATES COVERED June 19891 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Total

  20. 40 CFR 35.917-1 - Content of facilities plan.

    Science.gov (United States)

    2010-07-01

    ... potential opportunities for recreation, open space, and access to bodies of water analyzed in planning the... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Content of facilities plan. 35.917-1 Section 35.917-1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER...

  1. Fast flux test facility, transition project plan

    Energy Technology Data Exchange (ETDEWEB)

    Guttenberg, S.

    1994-11-15

    The FFTF Transition Project Plan, Revision 1, provides changes and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  2. Facility management and energy efficiency -- analysis and recommendations; Facility Management und Energieeffizienz: Analyse und Handlungsempfehlungen

    Energy Technology Data Exchange (ETDEWEB)

    Staub, P.; Weibel, K.; Zaugg, T. [Pom and Consulting Ltd., Zuerich (Switzerland); Lang, R. [Gruenberg and Partner Ltd., Zuerich (Switzerland); Frei, Ch. [Herzog Kull Group, Aarau (Switzerland)

    2001-07-01

    This final report presents the results of a study made on how facility management (FM) is positioned in enterprises and on how energy management can be integrated into the facility management process. Also, recommendations are made on the actions that are considered necessary to improve the understanding of facility management and energy management. The findings of an analysis made of the results of a survey among 200 enterprises, 20 interviews and 5 case studies are presented. The authors state that, in spite of the relatively small sample taken - mostly larger enterprises - trends in facility management and energy management could be shown. The findings of the survey, such as the relative importance of the integration of energy topics in facility management and the need for standardised indicators and benchmarking, are discussed in detail. Also, it is noted that the success of FM is in part due to delegation of responsibility to smaller business units or even to individual employees. The market potential for FM services is examined, with yearly growth rates of up to 20%. The importance of anchoring FM strategies at the top level of management is stressed, as is the need for promotion of the idea of facility management and training concepts for those responsible for its implementation.

  3. Facility effluent monitoring plan for WESF

    Energy Technology Data Exchange (ETDEWEB)

    SIMMONS, F.M.

    1999-09-01

    The FEMP for the Waste Encapsulation and Storage Facility (WESF) provides sufficient information on the WESF effluent characteristics and the effluent monitoring systems so that a compliance assessment against applicable requirements may be performed. Radioactive and hazardous material source terms are related to specific effluent streams that are in turn, related to discharge points and, finally are compared to the effluent monitoring system capability.

  4. Planning and Designing Today's Career Tech Facility

    Science.gov (United States)

    Seaman, James

    2010-01-01

    During the past 20 years, career and technical education (CTE) has gone through significant changes. CTE has evolved in response to the changes technology has had on the job market. Preparing students for high-tech, high-skill job opportunities is the new focus. The facilities that house these programs, however, have not kept pace with these…

  5. Facility effluent monitoring plan for the plutonium-uranium extraction facility

    Energy Technology Data Exchange (ETDEWEB)

    Lohrasbi, J.; Johnson, D.L. [Westinghouse Hanford Co., Richland, WA (United States); De Lorenzo, D.S. [Los Alamos Technical Associates, NM (United States)

    1993-12-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.

  6. Management Planning: Innovation on Campus.

    Science.gov (United States)

    Hall, Stephen S. J.

    1973-01-01

    Management planning is a body of concepts and techniques designed to facilitate the analytical and forecasting processes within a department, to increase the decision-making prerogatives of the department director within predetermined guidelines, and to encourage and reinforce communication both among the departments and between the departments…

  7. Capacity Planning and Leadtime management

    NARCIS (Netherlands)

    Zijm, Willem H.M.; Buitenhek, R.

    1996-01-01

    In this paper we discuss a framework for capacity planning and lead time management in manufacturing companies, with an emphasis on the machine shop. First we show how queueing models can be used to find approximations of the mean and the variance of manufacturing shop lead times. These quantities

  8. LSHTM Data Management Plan for research projects

    OpenAIRE

    Knight, G

    2017-01-01

    A Data Management Plan is a planning document that outlines the decisions made on how data will be created, managed and used during a project. This document provides a template for use when planning data management activities in your research. Completed plans should be emailed to for comment.

  9. National Ignition Facility pollution prevention and waste minimization plan

    Energy Technology Data Exchange (ETDEWEB)

    Cantwell, B.; Celeste, J.

    1998-09-01

    This document is the Lawrence Livermore National Laboratory (LLNL) National Ignition Facility (NIF) Pollution Prevention and Waste Minimization Plan. It will not only function as the planning document for anticipating, minimizing, and mitigating NIF waste generation, but it is also a Department of Energy (DOE) milestone document specified in the facility's Mitigation Action Plan (MAP). As such, it is one of the ''living'' reference documents that will guide NIF operations through all phases of the project. This document will be updated periodically to reflect development of the NIF, from construction through lifetime operations.

  10. Development of Facilities Master Plan and Laboratory Renovation Project

    Energy Technology Data Exchange (ETDEWEB)

    Fox, Andrea D

    2011-10-03

    Funding from this grant has allowed Morehouse School of Medicine to complete its first professionally developed, comprehensive campus master plan that is in alignment with the recently completed strategic plan. In addition to master planning activities, funds were used for programming and designing research renovations, and also to supplement other research facility upgrades by providing lighting and equipment. The activities funded by this grant will provide the catalyst for substantial improvement in the School's overall facilities for biomedical education and research, and will also provide much of the information needed to conduct a successful campaign to raise funds for proposed buildings and renovations.

  11. Federal Facilities Compliance Act, Conceptual Site Treatment Plan. Part 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-10-29

    This Conceptual Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed in this document include: general discussion of the plan, including the purpose and scope; technical aspects of preparing plans, including the rationale behind the treatability groupings and a discussion of characterization issues; treatment technology needs and treatment options for specific waste streams; low-level mixed waste options; TRU waste options; and future waste generation from restoration activities.

  12. Waste Encapsulation and Storage Facility (WESF) Quality Assurance Program Plan (QAPP)

    Energy Technology Data Exchange (ETDEWEB)

    ROBINSON, P.A.

    2000-04-17

    This Quality Assurance Plan describes how the Waste Encapsulation and Storage Facility (WESF) implements the quality assurance (QA) requirements of the Quality Assurance Program Description (QAPD) (HNF-Mp-599) for Project Hanford activities and products. This QAPP also describes the organizational structure necessary to successfully implement the program. The QAPP provides a road map of applicable Project Hanford Management System Procedures, and facility specific procedures, that may be utilized by WESF to implement the requirements of the QAPD.

  13. Usability: managing facilities for social outcomes

    DEFF Research Database (Denmark)

    Alexander, Keith; Blakstad, Siri; Hansen, Geir

    2013-01-01

    they used to understand, as well as to design and manage the relationship between activities and places. The paper describes and reviews the development of the field of research on usability. It concludes that the action and use of facilities is strongly related to experiences of the users and thus......111 on Usability has been exploring concepts, methods and tools, developed in the evaluation of all kinds of consumer products, applied to the built environment. In the most recent phase of this work, conducted over the past three years, an international network of partners has collaborated to focus...... properties of a workplace, they could better manage and design the facilities for improved social outcomes. Interpretation and analysis of the built environment (and support services) based on how it is socially constructed will enable integration of organisational use and the facilities provided to arrive...

  14. Forest Resource Management Plans: A Sustainability Approach

    Science.gov (United States)

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  15. Forest Resource Management Plans: A Sustainability Approach

    Science.gov (United States)

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  16. Managing Inventory At A Transitional Facility

    Science.gov (United States)

    Hutchins, Henry A.

    1993-01-01

    Kennedy Inventory Management System, KIMS, geared to needs of facility in transition from research and development to manufacturing. Operated jointly by several contractors at Kennedy Space Center, KIMS designed to reduce cost and increase efficiency of fabrication and maintenance of spaceflight hardware.

  17. Perspectives on Leadership in Facilities Management.

    Science.gov (United States)

    Jenkins, Charles W. Ed.

    This collection of papers examines issues concerning leadership in facilities management in higher education. Chapters include: (1) "Catch the Spirit of Leadership" (Jack Hug); (2) "Visionary Leadership: Creating a New Tomorrow" (Burt Nanus); (3) "Some Thoughts on Leadership" (Charles W. Jenkins); (4) "Educational Leadership: The Role of…

  18. Planning the Teaching Environment: Secondary Science Facilities.

    Science.gov (United States)

    Engelhardt, David

    Reviews publications supporting the concept that carefully planned special characteristics of a classroom can facilitate desired activities both for the teacher and students. The author denotes these facilitating associations as the "suggestiveness of space," and applies the term "limiting conditions" to spacial characteristics which prevent…

  19. Business plan Hatchery Facility Zambezi Valley, Mozambique

    NARCIS (Netherlands)

    Vernooij, A.G.; Wilschut, S.

    2015-01-01

    This business plan focuses on the establishment of a hatchery, one of the essential elements of a sustainable and profitable poultry meat value chain. There is a growing demand for poultry meat in the Zambezi Valley, and currently a large part of the consumed broilers comes from other parts of the c

  20. Planning and Managing Drupal Projects

    CERN Document Server

    Nordin, Dani

    2011-01-01

    If you're a solo website designer or part of a small team itching to build interesting projects with Drupal, this concise guide will get you started. Drupal's learning curve has thrown off many experienced designers, particularly the way it handles design challenges. This book shows you the lifecycle of a typical Drupal project, with emphasis on the early stages of site planning. Learn how to efficiently estimate and set up your own project, so you can focus on ways to make your vision a reality, rather than let project management details constantly distract you. Plan and estimate your projec

  1. Waste Encapsulation and Storage Facility (WESF) Dangerous Waste Training Plan (DWTP)

    Energy Technology Data Exchange (ETDEWEB)

    SIMMONS, F.M.

    2000-03-29

    This Waste Encapsulation Storage Facility (WESF) Dangerous Waste Training Plan (DWTP) applies to personnel who perform work at, or in support of WESF. The plan, along with the names of personnel, may be given to a regulatory agency inspector upon request. General workers, subcontractors, or visiting personnel who have not been trained in the management of dangerous wastes must be accompanied by an individual who meets the requirements of this training plan. Dangerous waste management includes handling, treatment, storage, and/or disposal of dangerous and/or mixed waste. Dangerous waste management units covered by this plan include: less-than-90-day accumulation area(s); pool cells 1-8 and 12 storage units; and process cells A-G storage units. This training plan describes general requirements, worker categories, and provides course descriptions for operation of the WESF permitted miscellaneous storage units and the Less-than-90-Day Accumulation Areas.

  2. Energy Systems Integration Facility (ESIF): Facility Stewardship Plan, Revision 2.0

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, Art [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hannegan, Bryan [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-09-01

    The U.S. Department of Energy (DOE), Office of Energy Efficiency and Renewable Energy, has established the Energy Systems Integration Facility (ESIF) on the campus of the National Renewable Energy Laboratory (NREL) and has designated it as a DOE user facility. This 182,500-sq. ft. research facility provides state-of-the-art laboratory and support infrastructure to optimize the design and performance of electrical, thermal, fuel, and information technologies and systems at scale. This Facility Stewardship Plan serves to provide DOE and other decision makers with information on the existing and expected capabilities of ESIF, and the expected performance metrics to be applied to ESIF operations. This Plan is a living document that will be updated and refined throughout the lifetime of the facility.

  3. Ottawa National Wildlife Refuge : Cropland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Ottawa NWR Cropland Management Plan addresses management practices of refuge land and serves as a guide to future management of cropland and moist soil management.

  4. Design and Management of a Transgenic Facility

    Institute of Scientific and Technical Information of China (English)

    Bob Springsteen

    2001-01-01

    @@ In 1965, I was given the opportunity to manage a research animal colony. At that time, the animal colony consisted of numerous species, such as primates, dogs, cats, rab bits, guinea pigs, hamsters, rats, mice, and some farm animals as well. Over the years,this menagerie was reduced to mice and rab bits. The animal facility now houses 8 000mice, of which 80% are transgenics. In approximately six years, transgenic mice have become the mainstay of the Berkeley Lab animal facility, and this population continues to grow.

  5. Development techniques of computerized maintenance management system for nuclear fuel cycle examination facilities

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Yon Woo; Kim, S. D.; Soong, W. S.; Kim, G. H.; Oh, W. H.; Kim, Y. G

    2000-12-01

    Normal operation of the facility is one of the key factors in the accomplishments of research goals. As confirmed by a case study of the influence of the facility operation condition on the research results, emphasis should be put on the facility preserve management. Facilities should be maintained in solid operational condition and their malfunctions should be repaired as soon as possible. The purpose of this project is to make propositions on the development of the facility Preserve management system which is to maximize the efficiency of the budget execution, manpower organization and maintenance planning, and is to minimize the duration of the operational pause due to malfunctions with the least disbursement.

  6. Department of Energy’s ARM Climate Research Facility External Data Center Operations Plan Located At Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Cialella, A. [Brookhaven National Lab. (BNL), Upton, NY (United States); Gregory, L. [Brookhaven National Lab. (BNL), Upton, NY (United States); Lazar, K. [Brookhaven National Lab. (BNL), Upton, NY (United States); Liang, M. [Brookhaven National Lab. (BNL), Upton, NY (United States); Ma, L. [Brookhaven National Lab. (BNL), Upton, NY (United States); Tilp, A. [Brookhaven National Lab. (BNL), Upton, NY (United States); Wagener, R. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2015-05-01

    The External Data Center (XDC) Operations Plan describes the activities performed to manage the XDC, located at Brookhaven National Laboratory (BNL), for the Department of Energy’s Atmospheric Radiation Measurement (ARM) Climate Research Facility. It includes all ARM infrastructure activities performed by the Data Management and Software Engineering Group (DMSE) at BNL. This plan establishes a baseline of expectation within the ARM Operations Management for the group managing the XDC.

  7. Annual water management plan - 1983-1984

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Arapahoe National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  8. Annual water management plan 1994-1995

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Arapahoe National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  9. Annual Water Management Plan, Part II

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan is to establish a schedule...

  10. Annual water management plan 1995-1996

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Arapahoe National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  11. Necedah National Wildlife Refuge furbearer management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Furbearer Management Plan for the Necedah National Wildlife Refuge is one of several step-down plans identified in the Refuge’s Comprehensive Conservation Plan...

  12. Community Relations Plan, Bulk Fuels Facility Spill, Solid Waste Management Units ST-106 and SS-111, Kirtland AFB, Albuquerque New Mexico

    Science.gov (United States)

    2012-02-01

    Montgomery Blvd NE Albuquerque, N.M. 87109 Phone: (505) 884-8355 E-mail: kazq32@kazq32.org KLUZ-TV Channel 41 (Spanish) 2725-F Broadbent ...www.krqe.com KTFQ-DT (Spanish Entertainment) 2725-F Broadbent Parkway NE Albuquerque, NM 87107 Voice: (505) 342-4141 Radio Stations: KABQ-AM...APPENDIX A Kirtland AFB BFF February 2012 Community Relations Plan, Appendix A KAFB-010-0014c KRZY-AM 1450 2725 Broadbent Pkwy

  13. Forest Management Plan : Shiawassee National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Shiawassee National Wildlife Refuge Forest Management Plan is a general plan which outlines the refuge management objectives, forest description, forest...

  14. Litchfield Wetland Management District: Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Litchfield Wetland Management District for the next 15 years. This plan outlines the...

  15. Fur Management Plan : Muscatatuck National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Muscatatuck NWR Fur Management Plan directs the management and regulation of trapping. The plan provides a description of the Refuge, describes the relation of...

  16. Forest Management Plan : Seney National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Seney National Wildlife Refuge Forest Management Plan is a general plan which outlines the management objectives, forest descriptions and silviculture of various...

  17. Grassland Management Plan : Trempealeau National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Trempealeau National Wildlife Refuge Grassland Management Plan provides guidelines for grassland habitat preservation and management. The goals of this plan aim...

  18. Station Management Plan Maine Coastal Refuges

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This management plan outlines how four Maine refuges and twelve islands and one peninsula should be managed over the next three to five years. Plan results are...

  19. Air quality management planning (AQMP

    Directory of Open Access Journals (Sweden)

    Sivertsen Bjarne

    2012-01-01

    Full Text Available In most urban areas of the world, particulate matter (PM levels pose severe problems, addressed in several policy areas (air quality, climate change, and human health. PM presents multiple challenges due to the multitude of its sources, spanning many sectors of economic activity as well as nature, and due to the complexity of atmospheric processes involved in its transport and secondary formation. For the authorities, the goal is to assure minimal impacts of atmospheric PM levels, in practice represented by compliance with existing regulations and standards. This may be achieved through an air quality management plan (AQMP. In Northern America and in parts of Europe, comprehensive research programs have guided development of AQMP over the last forty years. This cumulated experience can be utilized by others who face the same problems, but have yet to develop their own substantial research base. The main purpose of the AQMP development process is to establish an effective and sound basis for planning and management of air quality in a selected area. This type of planning will ensure that significant sources of impacts are identified and controlled in a most cost-effective manner. The choice of tools, methods and input information is often dictated by their availability, and should be evaluated against current best practices. Important elements of the AQMP are the identification of sources and development of a complete emission inventory, the development and operation of an air quality monitoring programme, and the development and application of atmospheric dispersion models. Major task is to collect the necessary input data. The development of the AQMP will take into account: - Air Quality Management System (AQMS requirements; - Operational and functional structure requirements; - Source identification through emission inventories; - Source reduction alternatives, which may be implemented; - Mechanisms for facilitating interdepartmental

  20. Space shuttle program: Shuttle Avionics Integration Laboratory. Volume 7: Logistics management plan

    Science.gov (United States)

    1974-01-01

    The logistics management plan for the shuttle avionics integration laboratory defines the organization, disciplines, and methodology for managing and controlling logistics support. Those elements requiring management include maintainability and reliability, maintenance planning, support and test equipment, supply support, transportation and handling, technical data, facilities, personnel and training, funding, and management data.

  1. Environmental guidelines for development of Cultural Resource Management plans. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The purpose of this document is to provide guidelines to the DOE field managements with responsibility for the development of an individual Cultural Resource Management Plan for each DOE facility and program.

  2. Dismantlement and Radioactive Waste Management of DPRK Nuclear Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Jooho, W.; Baldwin, G. T.

    2005-04-01

    One critical aspect of any denuclearization of the Democratic People’s Republic of Korea (DPRK) involves dismantlement of its nuclear facilities and management of their associated radioactive wastes. The decommissioning problem for its two principal operational plutonium facilities at Yongbyun, the 5MWe nuclear reactor and the Radiochemical Laboratory reprocessing facility, alone present a formidable challenge. Dismantling those facilities will create radioactive waste in addition to existing inventories of spent fuel and reprocessing wastes. Negotiations with the DPRK, such as the Six Party Talks, need to appreciate the enormous scale of the radioactive waste management problem resulting from dismantlement. The two operating plutonium facilities, along with their legacy wastes, will result in anywhere from 50 to 100 metric tons of uranium spent fuel, as much as 500,000 liters of liquid high-level waste, as well as miscellaneous high-level waste sources from the Radiochemical Laboratory. A substantial quantity of intermediate-level waste will result from disposing 600 metric tons of graphite from the reactor, an undetermined quantity of chemical decladding liquid waste from reprocessing, and hundreds of tons of contaminated concrete and metal from facility dismantlement. Various facilities for dismantlement, decontamination, waste treatment and packaging, and storage will be needed. The shipment of spent fuel and liquid high level waste out of the DPRK is also likely to be required. Nuclear facility dismantlement and radioactive waste management in the DPRK are all the more difficult because of nuclear nonproliferation constraints, including the call by the United States for “complete, verifiable and irreversible dismantlement,” or “CVID.” It is desirable to accomplish dismantlement quickly, but many aspects of the radioactive waste management cannot be achieved without careful assessment, planning and preparation, sustained commitment, and long

  3. Dismantlement and radioactive waste management of North Korean nuclear facilities.

    Energy Technology Data Exchange (ETDEWEB)

    Whang, Jooho (Kyung Hee University, South Korea); Baldwin, George Thomas

    2004-07-01

    One critical aspect of any denuclearization of the Democratic People's Republic of Korea (DPRK) involves dismantlement of its nuclear facilities and management of their associated radioactive wastes. The decommissioning problem for its two principal operational plutonium facilities at Yongbyun, the 5MWe nuclear reactor and the Radiochemical Laboratory reprocessing facility, alone present a formidable challenge. Dismantling those facilities will create radioactive waste in addition to existing inventories of spent fuel and reprocessing wastes. Negotiations with the DPRK, such as the Six Party Talks, need to appreciate the enormous scale of the radioactive waste management problem resulting from dismantlement. The two operating plutonium facilities, along with their legacy wastes, will result in anywhere from 50 to 100 metric tons of uranium spent fuel, as much as 500,000 liters of liquid high-level waste, as well as miscellaneous high-level waste sources from the Radiochemical Laboratory. A substantial quantity of intermediate-level waste will result from disposing 600 metric tons of graphite from the reactor, an undetermined quantity of chemical decladding liquid waste from reprocessing, and hundreds of tons of contaminated concrete and metal from facility dismantlement. Various facilities for dismantlement, decontamination, waste treatment and packaging, and storage will be needed. The shipment of spent fuel and liquid high level waste out of the DPRK is also likely to be required. Nuclear facility dismantlement and radioactive waste management in the DPRK are all the more difficult because of nuclear nonproliferation constraints, including the call by the United States for 'complete, verifiable and irreversible dismantlement', or 'CVID'. It is desirable to accomplish dismantlement quickly, but many aspects of the radioactive waste management cannot be achieved without careful assessment, planning and preparation, sustained commitment, and

  4. Quality Assurance Program Plan (QAPP) Waste Management Project

    Energy Technology Data Exchange (ETDEWEB)

    VOLKMAN, D.D.

    1999-10-27

    This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program.

  5. ICT Adoption in Facilities Management Supply Chain

    DEFF Research Database (Denmark)

    Scupola, Ada

    2012-01-01

    This article involves a qualitative study of factors impacting the adoption of ICT solutions in the Danish facility management supply chain. The results show that there are a number of drivers and barriers that influence the adoption of ICT solutions in this service sector. These have been grouped...... under three major categories: organizational factors including strategic and operational factors; external environmental factors including supplier interdependence and industry characteristics; and technological factors including compatibility and complexity. The study is relevant to researchers...

  6. Facilities Management and Health Care at Home

    OpenAIRE

    Lundberg, Stefan

    2007-01-01

    The topic of this thesis is the new requirements that will be put upon the facilities management when the elderly are living longer in their own homes, in spite of illness, impairment and old age. For many reasons, especially demographic ones, this issue has come to the fore and since it has substantial political impact and considerably affects our living conditions, it will most certainly appear on the agenda of most Swedish housing companies in the near future. The growing number of inhabit...

  7. Mixed Waste Management Facility Groundwater Monitoring Report

    Energy Technology Data Exchange (ETDEWEB)

    Chase, J.

    1998-03-01

    During fourth quarter 1997, eleven constituents exceeded final Primary Drinking Water Standards (PDWS) in groundwater samples from downgradient monitoring wells at the Mixed Waste Management Facility. No constituents exceeded final PDWS in samples from upgradient monitoring wells. As in previous quarters, tritium and trichloroethylene were the most widespread elevated constituents. The groundwater flow directions and rates in the three hydrostratigraphic units were similar to those of previous quarters.

  8. Håndbog i Facilities Management

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    Facilities Management (FM) er et nyt nøgleord som mange nu anvender i forskellige forbindelser og sammenhænge. Dette hænger i høj grad sammen med manglen på en fælles dansk referenceramme for FM, der har givet frit spillerum for de mange forskellige definitioner af det engelske ord. Dansk...... Facilities Management netværk (DFM netværk) har i mange år arbejdet for en fælles definition af begrebet sammen med arbejdet for udbredelsen af kendskabet til FM, herunder uddannelse, erfaringsudveksling m.v. DFM netværk har udgivet en Håndbog i Facilities Management i samarbejde med bogens forfatter Per...... gennemgår alle aspekter af FM. Bogen gennemgår således en række mere traditionelle begreber, men kommer også igennem nyere begreber som out-sourcing, sale- and leaseback, benchmarking og mange andre. Forfatteren gennemgår i 10 kapitler så forskellige elementer som ledelse og organisation, økonomistyring...

  9. Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Poderis, Reed J. [NSTec; King, Rebecca A. [NSTec

    2013-09-30

    This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping, tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified or

  10. Facility Effluent Monitoring Plan for the Waste Receiving and Processing (WRAP) Facility

    Energy Technology Data Exchange (ETDEWEB)

    DAVIS, W.E.

    2000-03-08

    A facility effluent monitoring plan is required by the U.S. Department of Energy in Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee public safety, or the environment. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether these systems are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan ensures long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and must be updated, as a minimum, every 3 years.

  11. Strategic Facilities Planning: A Focus On Health Care

    Directory of Open Access Journals (Sweden)

    Ellen D. Hoadley

    2011-01-01

    Full Text Available Turbulent market conditions have forced the health care sector to re-examine its business and operational practices.  Health care has become increasingly complex as decisions and planning are reframed in light of the current lagging economy, an increased demand for services, new global competition, and impending legislation reform.  The stress is felt most keenly within the nation’s hospitals and consortia of health care facilitiesFacility planning decisions are no exception.  Hospital administrators are abandoning the once commonplace rules governing aging infrastructure renovations.  Instead, administrators are basing decisions within their respective strategic context and are attempting to align buildings, services, personnel, and technology to an overall plan that looks at markets, operations, and finances as resources for competitive advantage.  This paper reviews the strategic facilities planning literature and applies those best practices which support this organizational alignment for health care.  An application in the mid-Atlantic demonstrates that hospital facilities, by design, need to support the current and future needs of health care delivery systems, while dated structures impede industry advances.  Health care infrastructure improvements must proactively address technological, regulatory, and financial changes facing the sector.

  12. Hanford site ground water protection management plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    Ground water protection at the Hanford Site consists of preventative and remedial measures that are implemented in compliance with a variety of environmental regulations at local, state, and federal levels. These measures seek to ensure that the resource can sustain a broad range of beneficial uses. To effectively coordinate and ensure compliance with applicable regulations, the U.S. Department of Energy has issued DOE Order 5400.1 (DOE 1988a). This order requires all U.S. Department of Energy facilities to prepare separate ground water protection program descriptions and plans. This document describes the Ground Water Protection Management Plan (GPMP) for the Hanford Site located in the state of Washington. DOE Order 5400.1 specifies that the GPMP covers the following general topical areas: (1) documentation of the ground water regime; (2) design and implementation of a ground water monitoring program to support resource management and comply with applicable laws and regulations; (3) a management program for ground water protection and remediation; (4) a summary and identification of areas that may be contaminated with hazardous waste; (5) strategies for controlling hazardous waste sources; (6) a remedial action program; and (7) decontamination, decommissioning, and related remedial action requirements. Many of the above elements are currently covered by existing programs at the Hanford Site; thus, one of the primary purposes of this document is to provide a framework for coordination of existing ground water protection activities. The GPMP provides the ground water protection policy and strategies for ground water protection/management at the Hanford Site, as well as an implementation plan to improve coordination of site ground water activities.

  13. Standard Guide for Environmental Monitoring Plans for Decommissioning of Nuclear Facilities

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2010-01-01

    1.1 This guide covers the development or assessment of environmental monitoring plans for decommissioning nuclear facilities. This guide addresses: (1) development of an environmental baseline prior to commencement of decommissioning activities; (2) determination of release paths from site activities and their associated exposure pathways in the environment; and (3) selection of appropriate sampling locations and media to ensure that all exposure pathways in the environment are monitored appropriately. This guide also addresses the interfaces between the environmental monitoring plan and other planning documents for site decommissioning, such as radiation protection, site characterization, and waste management plans, and federal, state, and local environmental protection laws and guidance. This guide is applicable up to the point of completing D&D activities and the reuse of the facility or area for other purposes.

  14. Overview of the Hanford risk management plan

    Energy Technology Data Exchange (ETDEWEB)

    Halverson, T.G.

    1998-03-26

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context.

  15. Blackwater National Wildlife Refuge Furbearer Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Blackwater National Wildlife Refuge Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly...

  16. Water management plan : revised March 1988

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Content of the Ruby Lake NWR Water Management Plan includes information on refuge background, objectives and management strategies, and water management program...

  17. Fur Management Plan : Shiawassee National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Shiawassee NWR Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  18. Management plan abstract and keyword generator

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This fill-in-the-blank Word form will generate abstracts for common management plans including: cropland management, disease contingency, fire management, fishing,...

  19. Furbearer Management Plan : Agassiz National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Agassiz NWR Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly supports the environmental...

  20. Chautauqua National Wildlife Refuge : Fur Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Chautauqua National Wildlife Refuge Furbearer Management Plan directs the management and regulation of trapping. The furbearer management program directly...

  1. Refuge Management Plan, Part III : Chapter 2 : Forest Management Plan : Tamarac National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Tamarac NWR Forest Management Plan is a general plan which outlines the Refuge management objectives, forest description, forest management objectives,...

  2. Current trends in health facility planning, design, and construction.

    Science.gov (United States)

    Beale, Craig; Kittredge, Frank D

    2014-01-01

    It is critical now more than ever for today's healthcare facilities to serve as more than just a backdrop to the care provided--they can, and should, be an integral part of that care. In addition to promoting efficacy, delighting the senses, and placing patients and families at ease, facilities need to be high-performing, sustainable, and healthy environments. Creating today's healthcare facilities requires breaking through barriers in unexpected ways, and it often requires looking outside the healthcare profession for guidance. In this article, we explore current trends in health facility planning, design, and construction. Our focus is on the buildings that serve as venues for the provision of healthcare services across the full continuum, from prevention to critical care. In particular, we discuss four current broad trends and conclude with thoughts on future developments.

  3. Management concepts and safety applications for nuclear fuel facilities

    Energy Technology Data Exchange (ETDEWEB)

    Eisner, H.; Scotti, R.S. [George Washington Univ., Washington, DC (United States). School of Engineering and Applied Science; Delicate, W.S. [KEVRIC Co., Inc., Silver Spring, MD (United States)

    1995-05-01

    This report presents an overview of effectiveness of management control of safety. It reviews several modern management control theories as well as the general functions of management and relates them to safety issues at the corporate and at the process safety management (PSM) program level. Following these discussions, structured technique for assessing management of the safety function is suggested. Seven modern management control theories are summarized, including business process reengineering, the learning organization, capability maturity, total quality management, quality assurance and control, reliability centered maintenance, and industrial process safety. Each of these theories is examined for-its principal characteristics and implications for safety management. The five general management functions of planning, organizing, directing, monitoring, and integrating, which together provide control over all company operations, are discussed. Under the broad categories of Safety Culture, Leadership and Commitment, and Operating Excellence, key corporate safety elements and their subelements are examined. The three categories under which PSM program-level safety issues are described are Technology, Personnel, and Facilities.

  4. Natural Resource Management Plan for Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    green, T.

    2011-08-15

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in

  5. Innovative Procurement and Partnerships in Facilities Management

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2010-01-01

    cases from the Nordic countries in Europe shows, that the most outstanding examples of innovation in FM are initiated from the demand side and involves new forms of procurement with long term contracts. This paper considers in-depth two differing examples of such innovative procurement approaches from......Aim: The aim of the paper is to present, analyse and identify learning from two case studies of innovative procurement in Facilities Management (FM) concerning the establishments of partnerships between clients and providers. Approach and methodology: A major study of FM best practice covering 36...... municipal buildings and sports facilities in parts of the city of Copenhagen. Each of the case studies has involved both the client and the provider side of the collaboration. The paper presents, compare and analyze the two cases regarding intentions, procurement methods, forms of collaborations...

  6. Innovative Procurement and Partnerships in Facilities Management

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2011-01-01

    A major study of facilities management best practice covering 36 cases from the Nordic countries in Europe shows, that the most outstanding examples of innovation in FM are initiated from the demand side and involves new forms of procurement with long term contracts. This paper considers in depth...... two differing examples of such innovative procurement approaches. The first example is from a private pharmaceutical corporation, which has used so-called function based procurement in relation to office buildings. The second example is from a public organization, which has entered into so......-called operational partnerships with private providers concerning all municipal buildings and sports facilities in parts of a city. Each of the case studies has involved both the client and the provider side of the collaboration. The cases show that an essential element in a successful procurement and partnership...

  7. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S&M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S&M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the IFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of IFDP facilities was initiated in FY 1994 and will be completed in FY 1999. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $36M. The costs are summarized. Upon completion of deactivation, annual S&M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.

  8. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.

  9. Waste Management facilities fault tree databank 1995 status report

    Energy Technology Data Exchange (ETDEWEB)

    Minnick, W.V.; Wellmaker, K.A.

    1995-08-16

    The Safety Information Management and Analysis Group (SIMA) of the Safety Engineering Department (SED) maintains compilations of incidents that have occurred in the Separations and Process Control, Waste Management, Fuel Fabrication, Tritium and SRTC facilities. This report records the status of the Waste Management (WM) Databank at the end of CY-1994. The WM Databank contains more than 35,000 entries ranging from minor equipment malfunctions to incidents with significant potential for injury or contamination of personnel. This report documents the status of the WM Databank including the availability, training, sources of data, search options, Quality Assurance, and usage to which these data have been applied. Periodic updates to this memorandum are planned as additional data or applications are acquired.

  10. Facility Effluent Monitoring Plan for the 325 Radiochemical Processing Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Shields, K.D.; Ballinger, M.Y.

    1999-04-02

    This Facility Effluent Monitoring Plan (FEMP) has been prepared for the 325 Building Radiochemical Processing Laboratory (RPL) at the Pacific Northwest National Laboratory (PNNL) to meet the requirements in DOE Order 5400.1, ''General Environmental Protection Programs.'' This FEMP has been prepared for the RPL primarily because it has a ''major'' (potential to emit >0.1 mrem/yr) emission point for radionuclide air emissions according to the annual National Emission Standards for Hazardous Air Pollutants (NESHAP) assessment performed. This section summarizes the airborne and liquid effluents and the inventory based NESHAP assessment for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements. The RPL at PNNL houses radiochemistry research, radioanalytical service, radiochemical process development, and hazardous and radioactive mixed waste treatment activities. The laboratories and specialized facilities enable work ranging from that with nonradioactive materials to work with picogram to kilogram quantities of fissionable materials and up to megacurie quantities of other radionuclides. The special facilities within the building include two shielded hot-cell areas that provide for process development or analytical chemistry work with highly radioactive materials and a waste treatment facility for processing hazardous, mixed radioactive, low-level radioactive, and transuranic wastes generated by PNNL activities.

  11. Physics Experiments Planned for the National Ignition Facility

    Science.gov (United States)

    Verdon, Charles P.

    1998-11-01

    This talk will review the current status and plans for high energy density physics experiments to be conducted on the National Ignition Facility (NIF). The NIF a multi-laboratory effort, presently under construction at the Lawrence Livermore National Laboratory, is a 192 beam solid state glass laser system designed to deliver 1.8MJ (at 351nm) in temporal shaped pulses. This review will begin by introducing the NIF in the context of its role in the overall United States Stockpile Stewardship Program. The major focus of this talk will be to describe the physics experiments planned for the NIF. By way of introduction to the experiments a short review of the NIF facility design and projected capabilities will be presented. In addition the current plans and time line for the activation of the laser and experimental facilities will also be reviewed. The majority of this talk will focus on describing the national inertial confinement fusion integrated theory and experimental target ignition plan. This national plan details the theory and experimental program required for achieving ignition and modest thermonuclear gain on the NIF. This section of the presentation will include a status of the current physics basis, ignition target designs, and target fabrication issues associated with the indirect-drive and direct-drive approaches to ignition. The NIF design provides the capabilities to support experiments for both approaches to ignition. Other uses for the NIF, including non ignition physics relevant to the national security mission, studies relevant to Inertial Fusion Energy, and basic science applications, will also be described. The NIF offers the potential to generate new basic scientific understanding about matter under extreme conditions by making available a unique facility for research into: astrophysics and space physics, hydrodynamics, condensed matter physics, material properties, plasma physics and radiation sources, and radiative properties. Examples of

  12. Waste Encapsulation and Storage Facility (WESF) Waste Analysis Plan

    Energy Technology Data Exchange (ETDEWEB)

    SIMMONS, F.M.

    2000-12-01

    The purpose of this waste analysis plan (WAP) is to document waste analysis activities associated with the Waste Encapsulation and Storage Facility (WESF) to comply with Washington Administrative Code (WAC) 173-303-300(1), (2), (3), (4), (5), and (6). WESF is an interim status other storage-miscellaneous storage unit. WESF stores mixed waste consisting of radioactive cesium and strontium salts. WESF is located in the 200 East Area on the Hanford Facility. Because dangerous waste does not include source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of this documentation. The information on radionuclides is provided only for general knowledge.

  13. The facilities management market in Denmark

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2010-01-01

    for researching the market but particular the definition of space including acquisition as well as development, administration, operation, maintenance and utilities in the same main product is problematic. Research limitations/implications: The market research is limited to the Danish market, but the results......Purpose: To present the results of market surveys in Denmark, which have been based on and used to test a proposal for a new European standard for a taxonomy of Facilities Management (FM). Design/methodology: The market research included surveys of both the client side and the provider side...

  14. Trends in Facility Management Technology: The Emergence of the Internet, GIS, and Facility Assessment Decision Support.

    Science.gov (United States)

    Teicholz, Eric

    1997-01-01

    Reports research on trends in computer-aided facilities management using the Internet and geographic information system (GIS) technology for space utilization research. Proposes that facility assessment software holds promise for supporting facility management decision making, and outlines four areas for its use: inventory; evaluation; reporting;…

  15. The Remote Handled Immobilization Low Activity Waste Disposal Facility Environmental Permits & Approval Plan

    Energy Technology Data Exchange (ETDEWEB)

    DEFFENBAUGH, M.L.

    2000-08-01

    The purpose of this document is to revise Document HNF-SD-ENV-EE-003, ''Permitting Plan for the Immobilized Low-Activity Waste Project, which was submitted on September 4, 1997. That plan accounted for the interim storage and disposal of Immobilized-Low Activity Waste at the existing Grout Treatment Facility Vaults (Project W-465) and within a newly constructed facility (Project W-520). Project W-520 was to have contained a combination of concrete vaults and trenches. This document supersedes that plan because of two subsequent items: (1) A disposal authorization that was received on October 25, 1999, in a U. S. Department of Energy-Headquarters, memorandum, ''Disposal Authorization Statement for the Department of Energy Hanford site Low-Level Waste Disposal facilities'' and (2) ''Breakthrough Initiative Immobilized Low-Activity Waste (ILAW) Disposal Alternative,'' August 1999, from Lucas Incorporated, Richland, Washington. The direction within the U. S. Department of Energy-Headquarters memorandum was given as follows: ''The DOE Radioactive Waste Management Order requires that a Disposal authorization statement be obtained prior to construction of new low-level waste disposal facility. Field elements with the existing low-level waste disposal facilities shall obtain a disposal authorization statement in accordance with the schedule in the complex-wide Low-Level Waste Management Program Plan. The disposal authorization statement shall be issued based on a review of the facility's performance assessment and composite analysis or appropriate CERCLA documentation. The disposal authorization shall specify the limits and conditions on construction, design, operations, and closure of the low-level waste facility based on these reviews. A disposal authorization statement is a part of the required radioactive waste management basis for a disposal facility. Failure to obtain a disposal authorization statement

  16. Medicare Managed Care plan Performance, A Comparison...

    Data.gov (United States)

    U.S. Department of Health & Human Services — The study evaluates the performance of Medicare managed care, Medicare Advantage, Plans in comparison to Medicare fee-for-service Plans in three states with...

  17. Fish Management Plan : Muscatatuck National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is the Fish Management Plan for Muscatatuck NWR. The Plan provides an introduction to the Refuge, a description of the area, a description of the fish resource...

  18. FY 2015 - Stockpile Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-04-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  19. Spring Creek Common Allotment habitat management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Management plan for the Spring Creek Common Allotment on Charles M. Russell National Wildlife Refuge, in McCone and Garfield Counties, Montana. This plan discusses...

  20. Santee National Wildlife Refuge Fire Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this Fire Management Plan is to provide objectives and guidelines for managingthe 15,095 acres of the Santee National Wildlife Refuge. This plan will...

  1. FY 2016 - Stockpile Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-03-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  2. Tritium and ignition target management at the National Ignition Facility.

    Science.gov (United States)

    Draggoo, Vaughn

    2013-06-01

    Isotopic mixtures of hydrogen constitute the basic fuel for fusion targets of the National Ignition Facility (NIF). A typical NIF fusion target shot requires approximately 0.5 mmoles of hydrogen gas and as much as 750 GBq (20 Ci) of 3H. Isotopic mix ratios are specified according to the experimental shot/test plan and the associated test objectives. The hydrogen isotopic concentrations, absolute amounts, gas purity, configuration of the target, and the physical configuration of the NIF facility are all parameters and conditions that must be managed to ensure the quality and safety of operations. An essential and key step in the preparation of an ignition target is the formation of a ~60 μm thick hydrogen "ice" layer on the inner surface of the target capsule. The Cryogenic Target Positioning System (Cryo-Tarpos) provides gas handling, cyro-cooling, x-ray imaging systems, and related instrumentation to control the volumes and temperatures of the multiphase (solid, liquid, and gas) hydrogen as the gas is condensed to liquid, admitted to the capsule, and frozen as a single spherical crystal of hydrogen in the capsule. The hydrogen fuel gas is prepared in discrete 1.7 cc aliquots in the LLNL Tritium Facility for each ignition shot. Post-shot hydrogen gas is recovered in the NIF Tritium Processing System (TPS). Gas handling systems, instrumentation and analytic equipment, material accounting information systems, and the shot planning systems must work together to ensure that operational and safety requirements are met.

  3. The notion of strategy in facility management

    DEFF Research Database (Denmark)

    Holzweber, Markus

    2013-01-01

    and components of strategy in Facility Management (FM). Since strategy refers to a complex network of thoughts, insights, experiences, expertise, and expectations that provide general guidance for management action, organizations must keep pace with the changing environment to increase market shares and business...... success. Based on a literature review, the findings of the study report a service-strategy classification grid. Such a service-strategy grid provides for a better understanding of the business environment. The study findings are intended to enhance business managers’ understandings of the issues behind FM......Strategy implementation is critical for any type of organization. Strategy implementation is complex despite previous research describing mechanisms related to the construction of strategy and strategy use of organizations. In this article I attempt to fill this vacuity by examining strategy...

  4. The facilities management market in Denmark

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2010-01-01

    for researching the market but particular the definition of space including acquisition as well as development, administration, operation, maintenance and utilities in the same main product is problematic. Research limitations/implications: The market research is limited to the Danish market, but the results......Purpose: To present the results of market surveys in Denmark, which have been based on and used to test a proposal for a new European standard for a taxonomy of Facilities Management (FM). Design/methodology: The market research included surveys of both the client side and the provider side...... and was carried out by a management consultant company by telephone interviews based on definitions developed from drafts for the European FM taxonomy standard by a university researcher, who is a member of the standardisation work group. Findings: The proposed taxonomy for FM is in general a good basis...

  5. Nuclear Storage Facility Inventory and Information Management using the GraFIC Software.

    Energy Technology Data Exchange (ETDEWEB)

    Hickerson, T.W.

    1999-05-04

    Oak Ridge has developed an intelligent facility and information management system to provide near real time, verifiable status of safeguarded materials in a nuclear storage facility. The Graphical Facility Information System (GraFIC{trademark}) is a versatile software package designed to operate in a distributed computing environment. GraFIC{trademark} is integrated with a suite of rugged, low-cost sensors that remotely monitor the physical and/or assigned attributes associated with stored nuclear materials and reports item and facility activity to an unlimited number of authorized clients. The software also contains facility management tools to assist with space planning, record management, item location, and a variety of other facilities needs.

  6. Facility Effluent Monitoring Plan for Pacific Northwest National Laboratory Balance-of-Plant Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Ballinger, Marcel Y.; Gervais, Todd L.

    2004-11-15

    The Pacific Northwest National Laboratory (PNNL) operates a number of Research & Development (R&D) facilities for the U.S. Department of Energy (DOE) on the Hanford Site. Facility effluent monitoring plans (FEMPs) have been developed to document the facility effluent monitoring portion of the Environmental Monitoring Plan (DOE 2000) for the Hanford Site. Three of PNNL’s R&D facilities, the 325, 331, and 3720 Buildings, are considered major emission points for radionuclide air sampling, and individual FEMPs were developed for these facilities in the past. In addition, a balance-of-plant (BOP) FEMP was developed for all other DOE-owned, PNNL-operated facilities at the Hanford Site. Recent changes, including shutdown of buildings and transition of PNNL facilities to the Office of Science, have resulted in retiring the 3720 FEMP and combining the 331 FEMP into the BOP FEMP. This version of the BOP FEMP addresses all DOE-owned, PNNL-operated facilities at the Hanford Site, excepting the Radiochemical Processing Laboratory, which has its own FEMP because of the unique nature of the building and operations. Activities in the BOP facilities range from administrative to laboratory and pilot-scale R&D. R&D activities include both radioactive and chemical waste characterization, fluid dynamics research, mechanical property testing, dosimetry research, and molecular sciences. The mission and activities for individual buildings are described in Appendix A. Potential radioactive airborne emissions in the BOP facilities are estimated annually using a building inventory-based approach provided in federal regulations. Sampling at individual BOP facilities is based on a potential-to-emit assessment. Some of these facilities are considered minor emission points and thus are sampled routinely, but not continuously, to confirm the low emission potential. One facility, the 331 Life Sciences Laboratory, has a major emission point and is sampled continuously. Sampling systems are

  7. Kirtland's Warbler Wildlife Management Area Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Kirtland's Warbler Wildlife Management Area Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of...

  8. A conceptual model for barrier free facilities planning.

    Science.gov (United States)

    Bittencourt, R S; de M Guimarães, L B

    2012-01-01

    This paper presents the proposal of a model for planning a barrier free industrial facilities, considering the demands that inclusion requires, ranging from outside the factory (social environment), to the needs of the production system and the workstation. Along with literature review, the demands were identified in a shoe manufacturer that employs people with disabilities, and organized taxonomically in agreement with the structure for planning facilities. The results show that the problems are not primarily related to eliminating architectural barriers and factors aimed at preventing risks to people's health and safety but, rather, are related to the company's cultural environment, because the main hazards are managerial. In special cases, it is suggested there is a need to adjust those parts of tasks that the worker cannot do, or even to re-schedule work so as to make it possible for employees with disabilities to perform their tasks.

  9. Value Adding Management: A New Facilities Management Concept

    DEFF Research Database (Denmark)

    Jensen, Per Anker; Katchamart, Akarapong

    2011-01-01

    theories on added value of FM and real estate and the related concept of Value Management from building projects. The study is related to the EuroFM research group on The Added Value of FM. Design/methodology/approach: The study outlines a preliminary theoretical based management concept, which...... the relevance of the basic concept and provides an important example of how Value Adding Management can be implemented and added value measured. Originality/value: The study develops a concept of Value Adding Management, which is new in FM literature. It is expected to increase the awareness of the impacts...... and strategic importance of FM for organisations and can be a practical tool for facilities managers in implementing value adding strategies and practices....

  10. 324 Facility B-Cell quality process plan

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, J.L.

    1998-03-12

    This report documents the quality process plan for the restart of a hot cell in the B Plant, originally a bismuth phosphate processing facility, but later converted to a waste fractionation plant. B-Cell is currently being cleaned out and deactivated. TPA Milestone M-89-02 dictates that all mixed waste and equipment be removed from B-Cell by 5/31/1999. This report describes the major activities that remain for completion of the TPA milestone.

  11. Risk management activities at the DOE Class A reactor facilities

    Energy Technology Data Exchange (ETDEWEB)

    Sharp, D.A. [Westinghouse Savannah River Co., Aiken, SC (United States); Hill, D.J. [Argonne National Lab., IL (United States); Linn, M.A. [Oak Ridge National Lab., TN (United States); Atkinson, S.A. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Hu, J.P. [Brookhaven National Lab., Upton, NY (United States)

    1993-12-31

    The probabilistic risk assessment (PRA) and risk management group of the Association for Excellence in Reactor Operation (AERO) develops risk management initiatives and standards to improve operation and increase safety of the DOE Class A reactor facilities. Principal risk management applications that have been implemented at each facility are reviewed. The status of a program to develop guidelines for risk management programs at reactor facilities is presented.

  12. Risk management activities at the DOE Class A reactor facilities

    Energy Technology Data Exchange (ETDEWEB)

    Sharp, D.A. (Westinghouse Savannah River Co., Aiken, SC (United States)); Hill, D.J. (Argonne National Lab., IL (United States)); Linn, M.A. (Oak Ridge National Lab., TN (United States)); Atkinson, S.A. (EG and G Idaho, Inc., Idaho Falls, ID (United States)); Hu, J.P. (Brookhaven National Lab., Upton, NY (United States))

    1993-01-01

    The probabilistic risk assessment (PRA) and risk management group of the Association for Excellence in Reactor Operation (AERO) develops risk management initiatives and standards to improve operation and increase safety of the DOE Class A reactor facilities. Principal risk management applications that have been implemented at each facility are reviewed. The status of a program to develop guidelines for risk management programs at reactor facilities is presented.

  13. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-11-01

    The Hanford Site, located northwest of the city of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials, as well as for activities associated with nuclear energy development. The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. The 3718-F Alkali Metal Treatment and Storage Facility (3718-F Facility), located in the 300 Area, was used to store and treat alkali metal wastes. Therefore, it is subject to the regulatory requirements for the storage and treatment of dangerous wastes. Closure will be conducted pursuant to the requirements of the Washington Administrative Code (WAC) 173-303-610 (Ecology 1989) and 40 CFR 270.1. Closure also will satisfy the thermal treatment facility closure requirements of 40 CFR 265.381. This closure plan presents a description of the 3718-F Facility, the history of wastes managed, and the approach that will be followed to close the facility. Only hazardous constituents derived from 3718-F Facility operations will be addressed.

  14. Lower Hatchie Forest Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Lower Hatchie National Wildlife Refuge Forest Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of...

  15. Montezuma National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Montezuma National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  16. Rocky Mountain Arsenal : 2006 vegetation management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this Vegetation Management Plan (VMP) is to describe the approach for implementing vegetation management activities at the Rocky Mountain Arsenal...

  17. Rocky Mountain Arsenal : 2007 vegetation management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this Vegetation Management Plan (VMP) is to describe the approach for implementing vegetation management activities at the Rocky Mountain Arsenal...

  18. Wilderness Management Plan: Tamarac National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Wilderness Management Plan for Tamarac NWR provides an introduction to the Refuge; a description of the Wilderness Area; a summary of management practices;...

  19. Fisheries Management Plan : Muscatatuck National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Fisheries Management Plan for Muscatatuck NWR provides an introduction to the Refuge, summarizes the relationship of fishery management to Refuge objectives,...

  20. Muscatatuck National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Muscatatuck National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  1. Water Management Plan Recommendations for 2007

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This memorandum outlines the management strategy for water level management on St. Vincent Island in 2007. A table of planned water levels for each month is provided...

  2. Fire Management Plan and Environmental Assessment 2001

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Fire Management Plan outlines and details all of the refuge objectives for prescribed burns for the 1991 calendar year. It includes new fire management...

  3. Lacassine National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Lacassine National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  4. Chincoteague National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Chincoteague National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern...

  5. Agassiz National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Agassiz National Wildlife Refuge Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at...

  6. Fire management plan Modoc National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this plan is to initiate the integrated program of fire management. Component management actions will include suppression (including the appropriate...

  7. Sabine National Wildlife Refuge Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Sabine NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at the Refuge, to...

  8. Mandalay National Wildlife Refuges Habitat Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Mandalay NWR Habitat Management Plan provides a long-term vision and specific guidance on managing habitats for the resources of concern at the Refuge, to...

  9. Total quality management program planning

    Energy Technology Data Exchange (ETDEWEB)

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  10. Energy secretary Spencer Abraham announces department of energy 20-year science facility plan

    CERN Multimedia

    2003-01-01

    "In a speech at the National Press Club today, U.S. Energy Secretary Spencer Abraham outlined the Department of Energy's Office of Science 20-year science facility plan, a roadmap for future scientific facilities to support the department's basic science and research missions. The plan prioritizes new, major scientific facilities and upgrades to current facilities" (1 page).

  11. 40 CFR Appendix B to Subpart I of... - Allowance for Facilities Planning and Design

    Science.gov (United States)

    2010-07-01

    ... allowance under § 35.2025 for facilities planning and design. The Step 2+3, Step 3 and Step 7 grant... reimburse the grantee for costs actually incurred for facilities planning or design. Rather, the allowance... for Facilities Planning and Design Building cost Allowance as a percentage of building cost* $100,000...

  12. Planning Network of Sports Facilities in the Context of Montenegro Case Study: Herceg-Novi, Podgorica and Danilovgrad

    Directory of Open Access Journals (Sweden)

    Svetislav G. Popović

    2016-06-01

    Full Text Available Sports facilities of a city through the a long history of development of the city, starting with ancient Greece and Rome, had been evermore recognized as important areas of the city, the place of communication and interaction between people, places of unwinding everyday social life, so-called point of the urban gatherings. In addition to the social aspect, facilities for sport are often involved in the formation of the visual identity of a city. The land intended for sport and recreation are areas which are in the planning document designed to develop sports and recreational facilities, outdoors or indoors. Globalisation and the transition effects in Montenegro contributed faster transformation of society. This paper explores the urban parameters for the planning of sports and recreational zones in the city. During the transition period, the last 25 years, the system of planning and land management has experienced a major transformation in terms improper planning development of sports facilities, not supporting sports and recreation needs of the residents. For central and coastal region of Montenegro, it is characteristic rapid urbanization with significant migration and dominant construction of residential blocks and tourist facilities on the coast. The planning area for residential, has not been accompanied by adequate network of sports facilities. The purpose of this paper is to determine whether the existing network of sports facilities in Herceg-Novi, Danilovgrad and Podgorica can meet the needs of the residents, as well as to provide recommendations for the further development of the network of sports facilities.

  13. Stillwater Wildlife Management Area Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan summarizes last years planned water management program and actual CY 1983 water events. A more detailed summary is available in the CY 1983 Annual Water...

  14. Analytical framework for River Basin Management Planning

    DEFF Research Database (Denmark)

    Nielsen, Helle Ørsted; Pedersen, Anders Branth; Frederiksen, Pia

    This paper proposes a framework for the analysis of the planning approach, and the processes and procedures, which have been followed in the preparation of the River Basin District Management Plans (RBMPs). Different countries have different policy and planning traditions and -styles. Developed o...

  15. Solid Waste Management Planning--A Methodology

    Science.gov (United States)

    Theisen, Hilary M.; And Others

    1975-01-01

    This article presents a twofold solid waste management plan consisting of a basic design methodology and a decision-making methodology. The former provides a framework for the developing plan while the latter builds flexibility into the design so that there is a model for use during the planning process. (MA)

  16. Environmental Restoration Information Resource Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  17. Managing Dualities in Planned Change Initiatives

    Science.gov (United States)

    Barge, J. Kevin; Lee, Michael; Maddux, Kristy; Nabring, Richard; Townsend, Bryan

    2008-01-01

    Dualities play an important role in creating the conditions for change and managing planned change initiatives. Building on Seo, Putnam, and Bartunek's (2003) work, this study focuses on the dualities associated with managing change processes. A case study of a planned change process called the Circle of Prosperity Initiative, a multi-stakeholder…

  18. Smart facility location planning for Smart Cities: using GIS technology and facility provision standards for pro-active planning of social facilities to support smart growth

    CSIR Research Space (South Africa)

    Green, Chéri

    2016-08-01

    Full Text Available This paper describes a rational approach to the planning of social facility provision to eradicate service backlogs of the current period as well as preparing for the future. For more than a decade a GIS based methodology has been used in South...

  19. Impacts on waste planning and management

    CSIR Research Space (South Africa)

    Oelofse, Suzan

    2016-11-01

    Full Text Available the skills or experience to manage this waste responsibly. Available waste water infrastructure in the study area is under pressure and requires urgent intervention. The technologies and capacity at these already stressed facilities are not sufficient...

  20. Planning and managing the physician workforce

    OpenAIRE

    Schoenbaum Stephen C

    2012-01-01

    Abstract National planning and management of the physician workforce is a multifaceted, difficult, and even controversial activity. It is an important subset of overall health workforce planning and management, which contributes to a country's having an effective and efficient health care system. This commentary builds on a new survey of specialty considerations by Israeli medical students early in their clinical training, places it in the broader context of health workforce planning, and pro...

  1. MANAGING BUILDING CHECKIST PLANS USING BUSCLIS

    Directory of Open Access Journals (Sweden)

    M. Zulfahmi Toh

    2016-02-01

    Full Text Available This paper presents the software namely Building Submission Checklist System (BUSCLIS. It has been developed to manage the submission of building checklist plans process in the construction industry. BUSCLIS helps to simplify the management for acquiescence data of building plan approval for the Local Authority (LA and Country Planning in Malaysia through the web based system. BUSCLIS facilitates user through the computerization forms, which provides fast, efficient and effective service to the engineer, architect and contractor. Relevant and timely information manage by sophisticated BUSCLIS with the database management system MySQL

  2. State Environmental Policy Act (SEPA) Checklist for the 105-DR Large Sodium Fire Facility Closure Plan

    Energy Technology Data Exchange (ETDEWEB)

    1990-09-01

    The Hanford Site, located northwest of the city of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials, as well as for activities associated with nuclear energy development. The 105-DR Large Sodium Fire Facility (LSFF), which was in operation from about 1972 to 1986, was a research laboratory that occupied the former ventilation supply room on the southwest side of the 105-DR Reactor facility. The LSFF was established to provide means of investigating fire and safety aspects associated with large sodium or other metal alkali fires in the liquid metal fast breeder reactor (LMFBR) facilities. The 105-DR Reactor facility was designed and built in the 1950's and is located in the 100-D Area of the Hanford Site. The building housed the DR defense reactor, which was shut down in 1964. The LSFF is subject to the regulatory requirements for the storage and treatment of dangerous wastes. Clean closure is the proposed method of closure for the LSFF. Closure will be conducted pursuant to the requirements of the Washington Administrative Code (WAC) 173-303-610 (Ecology 1989). This closure plan presents a description of the facility, the history of wastes managed, and the procedures that will be followed to close the LSFF as an Alkali Metal Treatment Facility. No future use of the LSFF is expected.

  3. The LLNL Heavy Element Facility -- Facility Management, Authorization Basis, and Readiness Assessment Lessons Learned in the Heavy Element Facility (B251) Transition from Category II Nuclear Facility to Radiological Facility

    Energy Technology Data Exchange (ETDEWEB)

    Mitchell, M; Anderson, B; Brown, E; Gray, L

    2006-04-10

    This paper presents Facility Management, Readiness Assessment, and Authorization Basis experience gained and lessons learned during the Heavy Element Facility Risk Reduction Program (RRP). The RRP was tasked with removing contaminated glove boxes, radioactive inventory, and contaminated ventilation systems from the Heavy Element Facility (B251) at Lawrence Livermore National Laboratory (LLNL). The RRP was successful in its goal in April 2005 with the successful downgrade of B251 from a Category II Nuclear Facility to a Radiological Facility. The expertise gained and the lessons learned during the planning and conduct of the RRP included development of unique approaches in work planning/work control (''Expect the unexpected and confirm the expected'') and facility management. These approaches minimized worker dose and resulted in significant safety improvements and operational efficiencies. These lessons learned can help similar operational and management activities at other sites, including facilities restarting operations or new facility startup. B251 was constructed at LLNL to provide research areas for conducting experiments in radiochemistry using transuranic elements. Activities at B251 once included the preparation of tracer sets associated with the underground testing of nuclear devices and basic research devoted to a better understanding of the chemical and nuclear behavior of the transuranic elements. Due to the age of the facility, even with preventative maintenance, facility safety and experimental systems were deteriorating. A variety of seismic standards were used in the facility design and construction, which encompassed eight building increments constructed over a period of 26 years. The cost to bring the facility into compliance with the current seismic and other requirements was prohibitive, and simply maintaining B251 as a Category II nuclear facility posed serious cost considerations under a changing regulatory environment

  4. Systems Engineering Management Plan. Volume 5 of the MRS Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP).

  5. Basic fur management plan : Stillwater Wildlife Management Area

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This fur management plan for Stillwater Wildlife Management Area outlines methods of fur harvest, trapping territories, selection of trappers, trapping equipment,...

  6. Integrated Pest Management Plan Kulm Wetland Management District 1999

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Kulm WMD. The goals and...

  7. Amendment I : Basic fur management plan : Stillwater Wildlife Management Area

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This amendment to the fur management plan for Stillwater Wildlife Management area calls for the annual trapping of beaver. The Lower Carson River is overpopulated...

  8. Integrated Pest Management Plan : Kulm Wetland Management District 2004

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Integrated Pest Management Plan is to provide a comprehensive, environmentally sensitive approach to managing pests on the Kulm WMD. The goals and...

  9. [Evaluation model for municipal health planning management].

    Science.gov (United States)

    Berretta, Isabel Quint; Lacerda, Josimari Telino de; Calvo, Maria Cristina Marino

    2011-11-01

    This article presents an evaluation model for municipal health planning management. The basis was a methodological study using the health planning theoretical framework to construct the evaluation matrix, in addition to an understanding of the organization and functioning designed by the Planning System of the Unified National Health System (PlanejaSUS) and definition of responsibilities for the municipal level under the Health Management Pact. The indicators and measures were validated using the consensus technique with specialists in planning and evaluation. The applicability was tested in 271 municipalities (counties) in the State of Santa Catarina, Brazil, based on population size. The proposed model features two evaluative dimensions which reflect the municipal health administrator's commitment to planning: the guarantee of resources and the internal and external relations needed for developing the activities. The data were analyzed using indicators, sub-dimensions, and dimensions. The study concludes that the model is feasible and appropriate for evaluating municipal performance in health planning management.

  10. Defense Depot Tracy Total Quality Management Plan

    Science.gov (United States)

    1989-07-01

    PAGES TQM ( Total Quality Management ), Depot Operations, Continuous Process Improvement 16. PRICE CODE 17. SECURITY CLASSIFICATION 18. SECURITY...make up our pcrceptions of Total Quality Management . Our goal is to improve those proven management processes that have brought us success while being...MANIAGEMENT F. QUALITY AUDITS OF PRODUCTS AND OPERATIONS ASSETS MANAGEMENT 00 i .......... / ~899 29 03 1 EFENSE DEPOT TACY TOTAL QUALITY MANAGEMENT PLAN

  11. Vulnerability Assessments and Resilience Planning at Federal Facilities. Preliminary Synthesis of Project

    Energy Technology Data Exchange (ETDEWEB)

    Moss, R. H. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.; Blohm, A. J. [Univ. of Maryland, College Park, MD (United States); Delgado, A. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.; Henriques, J. J. [James Madison Univ., Harrisonburg, VA (United States); Malone, E L. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.

    2015-08-15

    U.S. government agencies are now directed to assess the vulnerability of their operations and facilities to climate change and to develop adaptation plans to increase their resilience. Specific guidance on methods is still evolving based on the many different available frameworks. Agencies have been experimenting with these frameworks and approaches. This technical paper synthesizes lessons and insights from a series of research case studies conducted by the investigators at facilities of the U.S. Department of Energy and the Department of Defense. The purpose of the paper is to solicit comments and feedback from interested program managers and analysts before final conclusions are published. The paper describes the characteristics of a systematic process for prioritizing needs for adaptation planning at individual facilities and examines requirements and methods needed. It then suggests a framework of steps for vulnerability assessments at Federal facilities and elaborates on three sets of methods required for assessments, regardless of the detailed framework used. In a concluding section, the paper suggests a roadmap to further develop methods to support agencies in preparing for climate change. The case studies point to several preliminary conclusions; (1) Vulnerability assessments are needed to translate potential changes in climate exposure to estimates of impacts and evaluation of their significance for operations and mission attainment, in other words into information that is related to and useful in ongoing planning, management, and decision-making processes; (2) To increase the relevance and utility of vulnerability assessments to site personnel, the assessment process needs to emphasize the characteristics of the site infrastructure, not just climate change; (3) A multi-tiered framework that includes screening, vulnerability assessments at the most vulnerable installations, and adaptation design will efficiently target high-risk sites and infrastructure

  12. Software configuration management plan for HANDI 2000 business management system

    Energy Technology Data Exchange (ETDEWEB)

    BENNION, S.I.

    1999-02-10

    The Software Configuration Management Plan (SCMP) describes the configuration management and control environment for HANDI 2000 for the PP and PS software, as well as any custom developed software. This plan establishes requirements and processes for uniform documentation and coordination of HANDI 2000. This SCMP becomes effective as of this document's acceptance and will provide guidance through implementation efforts.

  13. Risk management technique for liquefied natural gas facilities

    Science.gov (United States)

    Fedor, O. H.; Parsons, W. N.

    1975-01-01

    Checklists have been compiled for planning, design, construction, startup and debugging, and operation of liquefied natural gas facilities. Lists include references to pertinent safety regulations. Methods described are applicable to handling of other hazardous materials.

  14. Readiness plan, Hanford 300 Area Treated Effluent Disposal Facility: Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Storm, S.J.

    1994-11-08

    The 300 Area Treated Effluent Disposal Facility (TEDF) is designed for the collection, treatment, and eventual disposal of liquid waste from the 300 Area Process Sewer (PS) system. The PS currently discharges water to the 300 Area Process Trenches. Facilities supported total 54 buildings, including site laboratories, inactive buildings, and support facilities. Effluent discharges to the process sewer from within these facilities include heating, ventilation, and air conditioning systems, heat exchangers, floor drains, sinks, and process equipment. The wastewaters go through treatment processes that include iron coprecipitation, ion exchange and ultraviolet oxidation. The iron coprecipitation process is designed to remove general heavy metals. A series of gravity filters then complete the clarification process by removing suspended solids. Following the iron coprecipitation process is the ion exchange process, where a specific resin is utilized for the removal of mercury. The final main unit operation is the ultraviolet destruction process, which uses high power ultraviolet light and hydrogen peroxide to destroy organic molecules. The objective of this readiness plan is to provide the method by which line management will prepare for a Readiness Assessment (RA) of the TEDF. The self-assessment and RA will assess safety, health, environmental compliance and management readiness of the TEDF. This assessment will provide assurances to both WHC and DOE that the facility is ready to start-up and begin operation.

  15. Insect pest management decisions in food processing facilities

    Science.gov (United States)

    Pest management decision making in food processing facilities such as flour mills, rice mills, human and pet food manufacturing facilities, distribution centers and warehouses, and retail stores is a challenging undertaking. Insect pest management programs require an understanding of the food facili...

  16. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    Energy Technology Data Exchange (ETDEWEB)

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management`s operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  17. Native American Technical Assistance and Training for Renewable Energy Resource Development and Electrical Generation Facilities Management

    Energy Technology Data Exchange (ETDEWEB)

    A. David Lester

    2008-10-17

    The Council of Energy Resource Tribes (CERT) will facilitate technical expertise and training of Native Americans in renewable energy resource development for electrical generation facilities, and distributed generation options contributing to feasibility studies, strategic planning and visioning. CERT will also provide information to Tribes on energy efficiency and energy management techniques.This project will provide facilitation and coordination of expertise from government agencies and private industries to interact with Native Americans in ways that will result in renewable energy resource development, energy efficiency program development, and electrical generation facilities management by Tribal entities. The intent of this cooperative agreement is to help build capacity within the Tribes to manage these important resources.

  18. Native American Technical Assistance and Training for Renewable Energy Resource Development and Electrical Generation Facilities Management

    Energy Technology Data Exchange (ETDEWEB)

    A. David Lester

    2008-10-17

    The Council of Energy Resource Tribes (CERT) will facilitate technical expertise and training of Native Americans in renewable energy resource development for electrical generation facilities, and distributed generation options contributing to feasibility studies, strategic planning and visioning. CERT will also provide information to Tribes on energy efficiency and energy management techniques.This project will provide facilitation and coordination of expertise from government agencies and private industries to interact with Native Americans in ways that will result in renewable energy resource development, energy efficiency program development, and electrical generation facilities management by Tribal entities. The intent of this cooperative agreement is to help build capacity within the Tribes to manage these important resources.

  19. Waste Isolation Pilot Plant, Land Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives.

  20. D-Side: A Facility and Workforce Planning Group Multi-criteria Decision Support System for Johnson Space Center

    Science.gov (United States)

    Tavana, Madjid

    2005-01-01

    "To understand and protect our home planet, to explore the universe and search for life, and to inspire the next generation of explorers" is NASA's mission. The Systems Management Office at Johnson Space Center (JSC) is searching for methods to effectively manage the Center's resources to meet NASA's mission. D-Side is a group multi-criteria decision support system (GMDSS) developed to support facility decisions at JSC. D-Side uses a series of sequential and structured processes to plot facilities in a three-dimensional (3-D) graph on the basis of each facility alignment with NASA's mission and goals, the extent to which other facilities are dependent on the facility, and the dollar value of capital investments that have been postponed at the facility relative to the facility replacement value. A similarity factor rank orders facilities based on their Euclidean distance from Ideal and Nadir points. These similarity factors are then used to allocate capital improvement resources across facilities. We also present a parallel model that can be used to support decisions concerning allocation of human resources investments across workforce units. Finally, we present results from a pilot study where 12 experienced facility managers from NASA used D-Side and the organization's current approach to rank order and allocate funds for capital improvement across 20 facilities. Users evaluated D-Side favorably in terms of ease of use, the quality of the decision-making process, decision quality, and overall value-added. Their evaluations of D-Side were significantly more favorable than their evaluations of the current approach. Keywords: NASA, Multi-Criteria Decision Making, Decision Support System, AHP, Euclidean Distance, 3-D Modeling, Facility Planning, Workforce Planning.

  1. EXPERIENCE AND PLANS OF THE JLAB FEL FACILITY AS A USER FACILITY

    Energy Technology Data Exchange (ETDEWEB)

    Michelle D. Shinn

    2007-08-26

    Jefferson Lab's IR Upgrade FEL building was planned from the beginning to be a user facility, and includes an associated 600 m2 area containing seven laboratories. The high average power capability (multikilowatt-level) in the near-infrared (1-3 microns), and many hundreds of watts at longer wavelengths, along with an ultrafast (~ 1 ps) high PRF (10's MHz) temporal structure makes this laser a unique source for both applied and basic research. In addition to the FEL, we have a dedicated laboratory capable of delivering high power (many tens of watts) of broadband THz light. After commissioning the IR Upgrade, we once again began delivering beam to users in 2005. In this presentation, I will give an overview of the FEL facility and its current performance, lessons learned over the last two years, and a synopsis of current and future experiments.

  2. 78 FR 77550 - Integrated Corridor Management Deployment Planning Grants

    Science.gov (United States)

    2013-12-23

    ... Federal Highway Administration Integrated Corridor Management Deployment Planning Grants AGENCY: Federal... is extending the application period for the Integrated Corridor Management Deployment Planning Grants... Integrated Corridor Management Deployment Planning Grants. The purpose of this notice was to invite States...

  3. STRATEGIC PLANNING IN INFORMATION RESOURCES MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Cezar VASILESCU

    2013-10-01

    Full Text Available The field of strategic management has offered a variety of frameworks and concepts for the past years, many with the declared aim of “taking business and its management seriously”. Strategic planning can help an organization to build its sustained competitive advantage in the face of an uncertain marketplace, but it requires new ways of thinking in order to create feasible alternatives. This article examines how the Chief Information Officer (CIO can use strategy and planning as an enabler to meet the mission of an organization. The analysis focuses on some common problems that occur in strategic planning. Managers need to identify these potential issues, so that they can recognize and deal with them if they arise in their own strategic planning. A systems approach is taken which presents planning as an open inclusive process that seeks to produce flexible systems capable of growth and adaptation to meet changing needs and missions.

  4. Analytical framework for River Basin Management Planning

    DEFF Research Database (Denmark)

    Nielsen, Helle Ørsted; Pedersen, Anders Branth; Frederiksen, Pia

    This paper proposes a framework for the analysis of the planning approach, and the processes and procedures, which have been followed in the preparation of the River Basin District Management Plans (RBMPs). Different countries have different policy and planning traditions and -styles. Developed...... over a range of years, institutional set-up and procedures have been adapted to these. The Water Framework Directive imposes a specific ecosystem oriented management approach, which directs planning to the fulfilment of objectives linked to specific water bodies, and an emphasis on the involvement...... of stakeholders and citizens. Institutional scholars point out that such an eco-system based approach superimposed on an existing institutional set-up for spatial planning and environmental management may create implementation problems due to institutional misfit (Moss 2004). A need for adaptation of procedures...

  5. Oak Ridge National Laboratory Waste Management Plan. Rev. 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-12-01

    The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  6. Fishery Management Plan : Tamarac National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Fishery Management Plan for Tamarac NWR provides an inventory of fishery resources on the Refuge including a description of the water area and fish sampling...

  7. Fishery management plan: Yazoo National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This management plan was prepared by the U.S. Fish and Wildlife Service for Yazoo National Wildlife Refuge. Data was provided by the Refuge and Area Office Wildlife...

  8. Merced National Wildlife Refuge water management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The details of this plan are separated into ten sections: Background, Water Management Related Goals and Objectives, Policies and Procedures, Inventory and Existing...

  9. Russian River Interim Action Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — An interim action plan is presented to guide the 1979 management of the Kenai National Moose Range's portion of the lower Russian River and its confluence with the...

  10. Gulf of Maine Tern Management Plan 1984

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The following management plan provides an outline of the tasks proposed to restore tern numbers to levels approximating those reached during the last period of...

  11. Meredosia National Wildlife Refuge : Cropland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Meredosia National Wildlife Refuge Cropland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations at...

  12. Checklist for Reviewing EPA Quality Management Plans

    Science.gov (United States)

    This checklist will be used to review the Quality Management Plans (QMPs) that are submitted to the Quality Staff of the Office of Environmental Information (OEI) for Agency review under EPA Order 5360.1 A2.

  13. Cropland Management Plan: Louisa National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Louisa National Wildlife Refuge Cropland Management Plan focuses to the production of supplemental grain and browse foods to maintain wildlife populations at...

  14. 1991-92 Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Upper Mississippi River National Wildlife and Fish Refuge – McGregor District Water Management Plan has been developed to meet the station objectives set forth...

  15. Cropland Management Plan Hatchie National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Hatchie NWR Cropland Management Plan focuses to the production of supplemental grain and browse foods to maintain wildlife populations at approved objective...

  16. Crop Management Plan: Sherburne National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Sherburne NWR Cropland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations at approved objective...

  17. Agassiz National Wildlife Refuge : Cropland Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Agassiz NWR Cropland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations at approved objective...

  18. Cropland Management Plan: Necedah National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Necedah NWR Cropland Management Plan focuses on the production of supplemental grain and browse foods to maintain wildlife populations at approved objective...

  19. Fishery Management Plan : Mingo National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The objectives of the Mingo NWR Fishery Management Plan are to maintain and improve the quality of aquatic habitats for a well-balanced community of fish and other...

  20. Fire Management Plan : Ottawa National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document contains the Finding of No Significant Impact (FONSI) and the Environmental Assessment (EA) for the Ottawa NWR Fire Management Plan. A description of...

  1. Yukon Flats cooperative moose management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Moose management plan designed to promote an increase in the moose populations in the following ways. Improve moose harvest reporting to better document subsistence...

  2. Cropland Management Plan Dahomey National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Dahomey NWR Cropland Management Plan focuses to the production of supplemental grain and browse foods to maintain wildlife populations at approved objective...

  3. Introduction to Soil Fumigant Management Plans

    Science.gov (United States)

    Soil fumigant pesticide labels require users to prepare a site-specific fumigation management plan (FMP) before the application begins. EPA has developed templates that outline the elements required by the labels.

  4. Fishery management plan for the Dorris reservoir

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Fishery Management Plan for Dorris Reservoir at Modoc National Wildlife Refuge. The U.S. Fish and Wildlife service proposes to continue a public fishing program...

  5. BROOKHAVEN NATIONAL LABORATORY WILDLIFE MANAGEMENT PLAN.

    Energy Technology Data Exchange (ETDEWEB)

    NAIDU,J.R.

    2002-10-22

    The purpose of the Wildlife Management Plan (WMP) is to promote stewardship of the natural resources found at the Brookhaven National Laboratory (BNL), and to integrate their protection with pursuit of the Laboratory's mission.

  6. Agassiz National Wildlife Refuge : Safety Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The objectives of this Safety Management Plan are to identify and define safety hazards that may be encountered on Agassiz Refuge and the procedures to be followed...

  7. Draft of the PHENIX Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-10

    The PHENIX Management Plan provides the baselines and controls that the PHENIX and RHIC Projects will follow to meet the technical, cost, and schedule goals for the PHENIX detector at RHIC. This plan will be reviewed and updated as required, with revisions made by agreement among the signed participants.

  8. Sustainable forest management planning in Serbia

    Directory of Open Access Journals (Sweden)

    Medarević Milan

    2014-01-01

    Full Text Available The forest cover of Serbia occupies around 29% of its territory, which puts it among fairly well wooded countries in Europe. The forests of Serbia are characterized by both state and private forests, medium preservation status, i.e. 27% of area that is covered by insufficiently stocked stands. Coppice forests cover about 50% of the area, and private forests are additionally burdened by fragmented plots. Forest management planning in Serbia is older than 200 years (The Plan of Deliblato Sands Afforestation 1806. There are two basic assumptions that define forest management planning: sustainability and multifunctionality. Today, forest management planning in Serbia is regulated by the Law on forests and it has the characteristics of a system. The planning also has the characteristics of an integral, integrated and adaptive system. The latter is particularly important in terms of pronounced climatic changes. For the forests in protected objects of nature, there are also other types of plans that complement sector plans in forestry (e.g. management plans in protected areas.

  9. Management strategies for controlling endemic and seasonal mouse parvovirus infection in a barrier facility.

    Science.gov (United States)

    Reuter, Jon D; Livingston, Robert; Leblanc, Mathias

    2011-05-01

    Despite improved diagnostic and rederivation capabilities, research facilities still struggle to manage parvovirus infections (e.g., mouse parvovirus (MPV) and minute virus of mice) in mouse colonies. Multi-faceted approaches are needed to prevent adventitious organisms such as MPV from breaching a barrier facility. In this article, the authors document recent changes to the Salk Institute's animal care program that were intended to help manage mouse parvovirus in the barrier facility. Specifically, the Institute started to use a new disinfectant and to give mice irradiated feed. The authors found an association between these modifications and a reduction in MPV incidence and prevalence in endemically infected colonies. These data suggest that using irradiated feed and appropriate disinfectants with contemporary management practices can be an effective plan for eradicating or controlling MPV infection in a research facility. The authors recommend further study of the environmental risk factors for parvovirus infection and of potential biological interactions associated with the use of irradiated feed.

  10. Guidelines for developing NASA (National Aeronautics and Space Administration) ADP security risk management plans

    Science.gov (United States)

    Tompkins, F. G.

    1983-01-01

    This report presents guidance to NASA Computer security officials for developing ADP security risk management plans. The six components of the risk management process are identified and discussed. Guidance is presented on how to manage security risks that have been identified during a risk analysis performed at a data processing facility or during the security evaluation of an application system.

  11. Comprehensive development plans for the low- and intermediate-level radioactive waste disposal facility in Korea and preliminary safety assessment

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Kang Il; Kim, Jin Hyeong; Kwon, Mi Jin; Jeong, Mi Seon; Hong, Sung Wook; Park, Jin Beak [Korea Radioactive Waste Agency, Daejeon (Korea, Republic of)

    2016-12-15

    The disposal facility in Gyeongju is planning to dispose of 800,000 packages of low- and intermediate- level radioactive waste. This facility will be developed as a complex disposal facility that has various types of disposal facilities and accompanying management. In this study, based on the comprehensive development plan of the disposal facility, a preliminary post-closure safety assessment is performed to predict the phase development of the total capacity for the 800,000 packages to be disposed of at the site. The results for each scenario meet the performance target of the disposal facility. The assessment revealed that there is a significant impact of the inventory of intermediate-level radionuclide waste on the safety evaluation. Due to this finding, we introduce a disposal limit value for intermediate-level radioactive waste. With stepwise development of safety case, this development plan will increase the safety of disposal facilities by reducing uncertainties within the future development of the underground silo disposal facilities.

  12. Abbreviated sampling and analysis plan for planning decontamination and decommissioning at Test Reactor Area (TRA) facilities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-10-01

    The objective is to sample and analyze for the presence of gamma emitting isotopes and hazardous constituents within certain areas of the Test Reactor Area (TRA), prior to D and D activities. The TRA is composed of three major reactor facilities and three smaller reactors built in support of programs studying the performance of reactor materials and components under high neutron flux conditions. The Materials Testing Reactor (MTR) and Engineering Test Reactor (ETR) facilities are currently pending D/D. Work consists of pre-D and D sampling of designated TRA (primarily ETR) process areas. This report addresses only a limited subset of the samples which will eventually be required to characterize MTR and ETR and plan their D and D. Sampling which is addressed in this document is intended to support planned D and D work which is funded at the present time. Biased samples, based on process knowledge and plant configuration, are to be performed. The multiple process areas which may be potentially sampled will be initially characterized by obtaining data for upstream source areas which, based on facility configuration, would affect downstream and as yet unsampled, process areas. Sampling and analysis will be conducted to determine the level of gamma emitting isotopes and hazardous constituents present in designated areas within buildings TRA-612, 642, 643, 644, 645, 647, 648, 663; and in the soils surrounding Facility TRA-611. These data will be used to plan the D and D and help determine disposition of material by D and D personnel. Both MTR and ETR facilities will eventually be decommissioned by total dismantlement so that the area can be restored to its original condition.

  13. Technical Approach and Plan for Transitioning Spent Nuclear Fuel (SNF) Project Facilities to the Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    SKELLY, W.A.

    1999-10-06

    This document describes the approach and process in which the 100-K Area Facilities are to be deactivated and transitioned over to the Environmental Restoration Program after spent nuclear fuel has been removed from the K Basins. It describes the Transition Project's scope and objectives, work breakdown structure, activity planning, estimated cost, and schedule. This report will be utilized as a planning document for project management and control and to communicate details of project content and integration.

  14. Forest Management Plan, ERDA Oak Ridge Reservation: 1976--1980

    Energy Technology Data Exchange (ETDEWEB)

    Bradburn, D. M.

    1977-06-01

    The ERDA Oak Ridge Reservation Forest Management Plan is utilized as a guide in the managing and administering of the natural resources of the forest. A revised management plan summarizes the goals and accomplishment of the previous plan while recommending necessary improvements and alternatives for the ensuing management cycle. The management plan contains programmatic assessments of silvicultural activities and their environmental impacts.

  15. High-risk facilities. Emergency management in nuclear, chemical and hazardous waste facilities; Hochrisikoanlagen. Notfallschutz bei Kernkraft-, Chemie- und Sondermuellanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Kloepfer, Michael (ed.) [Humboldt-Universitaet, Berlin (Germany)

    2012-07-01

    The book on emergency management in high-risk facilities covers the following topics: Change in the nuclear policy, risk management of high-risk facilities as a constitutional problem - emergency management in nuclear facilities, operational mechanisms of risk control in nuclear facilities, regulatory surveillance responsibilities for nuclear facilities, operational mechanism of the risk control in chemical plants, regulatory surveillance responsibilities for chemical facilities, operational mechanisms of the risk control in hazardous waste facilities, regulatory surveillance responsibilities for hazardous waste facilities, civil law consequences in case of accidents in high-risk facilities, criminal prosecution in case of accidents in high-risk facilities, safety margins as site risk for emission protection facilities, national emergency management - strategic emergency management structures, warning and self-protection of the public in case of CBRN hazards including aspects of the psych-social emergency management.

  16. Design verification and validation plan for the cold vacuum drying facility

    Energy Technology Data Exchange (ETDEWEB)

    NISHIKAWA, L.D.

    1999-06-03

    The Cold Vacuum Drying Facility (CVDF) provides the required process systems, supporting equipment, and facilities needed for drying spent nuclear fuel removed from the K Basins. This document presents the both completed and planned design verification and validation activities.

  17. State Environmental Policy Act (SEPA) environmental checklist forms for 304 Concretion Facility Closure Plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 304 Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 304 Facility, the history of materials and waste managed, and the procedures that will be followed to close the 304 Facility. The 304 Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.

  18. Planning and managing the physician workforce.

    Science.gov (United States)

    Schoenbaum, Stephen C

    2012-03-12

    National planning and management of the physician workforce is a multifaceted, difficult, and even controversial activity. It is an important subset of overall health workforce planning and management, which contributes to a country's having an effective and efficient health care system. This commentary builds on a new survey of specialty considerations by Israeli medical students early in their clinical training, places it in the broader context of health workforce planning, and provides examples of some approaches and activities being taken in the United States that are applicable to other developed countries.This is a commentary on http://www.ijhpr.org/content/1/1/13.

  19. Planning and managing the physician workforce

    Directory of Open Access Journals (Sweden)

    Schoenbaum Stephen C

    2012-03-01

    Full Text Available Abstract National planning and management of the physician workforce is a multifaceted, difficult, and even controversial activity. It is an important subset of overall health workforce planning and management, which contributes to a country's having an effective and efficient health care system. This commentary builds on a new survey of specialty considerations by Israeli medical students early in their clinical training, places it in the broader context of health workforce planning, and provides examples of some approaches and activities being taken in the United States that are applicable to other developed countries. This is a commentary on http://www.ijhpr.org/content/1/1/13.

  20. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    Energy Technology Data Exchange (ETDEWEB)

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management's operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  1. Using multi-disciplinary strategic master facilities planning for organizations experiencing programmatic re-direction

    Energy Technology Data Exchange (ETDEWEB)

    Heubach, J.G.; Weimer, W.C.; Bruce, W.A.

    1993-12-01

    Facility master planning is critical to the future productivity of a laboratory and the quality of worklife for the laboratory staff. For organizations undergoing programmatic re-direction, a master facility planning approach linked to the organization`s strategic planning process is even more important. Major changes in an organization such as programmatic re-direction can significantly impact a broad range of variables which exceed the expertise of traditional planning teams, e.g., capacity variability, work team organization, organizational culture, and work process simplification. By expanding the diversity of the participants of the planning team, there is a greater likelihood that a research organization`s scientific, organizational, economic, and employees` needs can be meshed in the strategic plan and facility plan. Recent recommendations from facility planners suggest drawing from diverse fields in building multi-disciplinary planning teams: Architecture, engineering, natural science, social psychology, and strategic planning (Gibson,1993). For organizations undergoing significant operational or culture change, the master facility planning team should also include members with expertise in organizational effectiveness, industrial engineering, human resources, and environmental psychology. A recent planning and design project provides an example which illustrates the use of an expanded multi-disciplinary team engaged in planning laboratory renovations for a research organization undergoing programmatic re-direction. The purpose of the proposed poster session is to present a multi-disciplinary master facility planning process linked to an organization`s strategic planning process or organizational strategies.

  2. Spent Nuclear Fuel Project Document Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Connor, M.D.; Harizison, G.L.; Rice, W.C.

    1995-12-01

    The SNF Project Document Management Plan identifies and describes the currently available systems and processes for implementing and maintaining an effective document control and records management program. This program governs the methods by which documents are generated, released, distributed, maintained current, retired, and ultimately disposed.

  3. Graduate Student Project: Operations Management Product Plan

    Science.gov (United States)

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  4. National Ignition Facility quality assurance program plan revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Wolfe, C R

    1998-06-01

    NIF Project activities will be conducted in a manner consistent with the guidance and direction of the DOE Order on Quality Assurance (414.1), the LLNL QA Program, and the Laser Directorate QA Plan. Quality assurance criteria will be applied in a graded manner to achieve a balance between the rigor of application of QA measures and the scale, cost, and complexity of the work involved. Accountability for quality is everyone's, extending from the Project Manager through established lines of authority to all Project personnel, who are responsible for the requisite quality of their own work. The NLF QA Program will be implemented by personnel conducting their activities to meet requirements and expectations, according to established plans and procedures that reflect the way business is to be conducted on the Project.

  5. Using Tools of Strategic Management in Medical Facilities of Lublin Region

    Directory of Open Access Journals (Sweden)

    Jaworzynska Magdalena

    2017-06-01

    Full Text Available The purpose of this article is to evaluate the use of tools of strategic management in hospitals in Lublin region. The study was conducted among 14 medical entities from the area of Lublin Voivodeship. The survey was addressed to economic directors or chief accountants of health care facilities and sent by post. The questionnaire was also helpful in conducting an in-depth interview as it provided a required structure. As part of the interviews with managers of health care facilities, information beyond the questionnaire was acquired, e.g. about the mission. According to studies, most health care facilities develop strategic plans (71.4%. For 21.4% of the studied facilities, the strategic plan is known mainly to management. In contrast, 28.6% of entities do not have a strategic plan. The presented results of the research can increase the effectiveness of activities in each area of the health care facility, continuous process improvement and rapid response to changes in the environment.

  6. Public Facilities Management and Action Research for Sustainability

    DEFF Research Database (Denmark)

    Galamba, Kirsten Ramskov

    practice inspired by the principles of FM. The bottom up change process had an employee perspective, and the work provides answers to the challenges of creating a culture allowing for critical reflections in relation to the impact of FM practice on societal sustainability.......Current work is the main product of a PhD study with the initial working title ‘Sustainable Facilities Management’ at Centre for Facilities Management – Realdania Research, DTU Management 1. December 2008 – 30. November 2011. Here the notion of Public Sustainable Facilities Management (FM...

  7. Wilderness management plan : Farallon National Wildlife Refuge : Farallon Wilderness : Wilderness management plan [draft

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document is a plan regarding management of the Farallon Wilderness. After introducing the area, it analyzes current management practices against current public...

  8. Productivity enhancement planning using participative management concepts

    Science.gov (United States)

    White, M. E.; Kukla, J. C.

    1985-01-01

    A productivity enhancement project which used participative management for both planning and implementation is described. The process and results associated with using participative management to plan and implement a computer terminal upgrade project where the computer terminals are used by research and development (R&D) personnel are reported. The upgrade improved the productivity of R&D personnel substantially, and their commitment of the implementation is high. Successful utilization of participative management for this project has laid a foundation for continued style shift toward participation within the organization.

  9. Strategic plan for Hanford Site Environmental Restoration Information Management

    Energy Technology Data Exchange (ETDEWEB)

    Cowley, P.J.; Beck, J.E.; Gephart, R.E. [and others

    1994-06-01

    This strategic plan addresses information management for the Environmental Restoration (ER) Program at the Hanford Site. This Program leads the cleanup of the Hanford Site`s soil, groundwater, buried waste, and the decontamination and decommissioning of facilities. The vision that drives this strategic plan is to ensure that quality information is available to the people who need it, when they need it, at a convenient location, in a usable form, and at an acceptable cost. Although investments are being made in managing the vast amounts of information, which include data, records and documents associated with the Hanford Site`s production history and new cleanup mission, it is widely recognized that efforts to date have not accomplished the vision. Effective information management involves more than the compilation of massive amounts of electronic and non-electronic information. It also involves integrating information management into business processes that support user`s needs and decisionmaking. Only then can information management complement and enable environmental restoration priorities and practices, help identify environmental restoration requirements, and enable communication within the Environmental Restoration Program and between the Program and its stakeholders. Successfully accomplishing the Hanford Site mission requires an integrated approach to information management that crosses organizational boundaries, streamlines existing systems, and builds new systems that support the needs of the future. This plan outlines that approach.

  10. State Wildlife Management Area Public Facilities - points

    Data.gov (United States)

    Minnesota Department of Natural Resources — This point theme contains facilities and features for WMAs that are best represented as points. WMAs are part of the Minnesota state recreation system created to...

  11. State Wildlife Management Area Public Facilities - lines

    Data.gov (United States)

    Minnesota Department of Natural Resources — This line theme contains facilities and features for WMAs that are best represented as lines. WMAs are part of the Minnesota state recreation system created to...

  12. Louisiana Marsh Management Plan 1995

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — We sampled experimental research areas in the Barataria Basin of Louisiana during March and May, 1995, to examine the effects of structural marsh management on...

  13. Data Management and Preservation Planning for Big Science

    Directory of Open Access Journals (Sweden)

    Juan Bicarregui

    2013-06-01

    Full Text Available ‘Big Science’ - that is, science which involves large collaborations with dedicated facilities, and involving large data volumes and multinational investments – is often seen as different when it comes to data management and preservation planning. Big Science handles its data differently from other disciplines and has data management problems that are qualitatively different from other disciplines. In part, these differences arise from the quantities of data involved, but possibly more importantly from the cultural, organisational and technical distinctiveness of these academic cultures. Consequently, the data management systems are typically and rationally bespoke, but this means that the planning for data management and preservation (DMP must also be bespoke.These differences are such that ‘just read and implement the OAIS specification’ is reasonable Data Management and Preservation (DMP advice, but this bald prescription can and should be usefully supported by a methodological ‘toolkit’, including overviews, case-studies and costing models to provide guidance on developing best practice in DMP policy and infrastructure for these projects, as well as considering OAIS validation, audit and cost modelling.In this paper, we build on previous work with the LIGO collaboration to consider the role of DMP planning within these big science scenarios, and discuss how to apply current best practice. We discuss the result of the MaRDI-Gross project (Managing Research Data Infrastructures – Big Science, which has been developing a toolkit to provide guidelines on the application of best practice in DMP planning within big science projects. This is targeted primarily at projects’ engineering managers, but intending also to help funders collaborate on DMP plans which satisfy the requirements imposed on them.

  14. Stillwater Wildlife Management Area : Grasslands Management Plan : North Marsh Unit

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan is designed to serve as the initial Fish and Wildlife Service habitat management proposal for the North Marsh grazing unit of Stillwater National Wildlife...

  15. Total Quality Management Implementation Plan for Military Personnel Management

    Science.gov (United States)

    1989-09-01

    2050.. )ATE 3. REPORT TYPE AND DATES CO VERED 4. TITLE AND SUBTITLE 5,rrmir18 . FUNDING NUMBERS Total Quality Management Implementation Plan for...SUBJECT TERMS 15. NUMBER OF PAGES TQM ( Total Quality Management ), Military Personnel Management, Continuous Process Improvement 16. PRICE CODE 17. SECURITY...UNCLASSIFIED UNCLASSIFIED UL NSN 7540-01-280-5500 Standard Form 298 (Rev. 2-89) Prescribed by ANSI Std Z39-16 296-102 TOTAL QUALITY MANAGEMENT I

  16. 77 FR 21161 - National Forest System Land Management Planning

    Science.gov (United States)

    2012-04-09

    ... Land Management Planning; Final Rule #0;#0;Federal Register / Vol. 77 , No. 68 / Monday, April 9, 2012... National Forest System Land Management Planning AGENCY: Forest Service, USDA. ACTION: Final rule and record... land management planning rule (planning rule). The new planning rule guides the development, amendment...

  17. An Application of Business Process Management to Health Care Facilities.

    Science.gov (United States)

    Hassan, Mohsen M D

    The purpose of this article is to help health care facility managers and personnel identify significant elements of their facilities to address, and steps and actions to follow, when applying business process management to them. The ABPMP (Association of Business Process Management Professionals) life-cycle model of business process management is adopted, and steps from Lean, business process reengineering, and Six Sigma, and actions from operations management are presented to implement it. Managers of health care facilities can find in business process management a more comprehensive approach to improving their facilities than Lean, Six Sigma, business process reengineering, and ad hoc approaches that does not conflict with them because many of their elements can be included under its umbrella. Furthermore, the suggested application of business process management can guide and relieve them from selecting among these approaches, as well as provide them with specific steps and actions that they can follow. This article fills a gap in the literature by presenting a much needed comprehensive application of business process management to health care facilities that has specific steps and actions for implementation.

  18. Information Value Distance and Crisis Management Planning

    Directory of Open Access Journals (Sweden)

    Brahim Herbane

    2014-04-01

    Full Text Available Organizational learning during and post-crisis is well established in the management literature but consideration of learning for crisis and the sources of information perceived to be useful for crisis management planning have not previously been examined. This study evaluates data from 215 U.K.-based small- and medium-sized enterprises (SMEs about the perceived value of 11 sources of information between planning (i.e., firms with a crisis management plan and non-planning respondents. For planning firms, the information sources considered to be useful are exclusively experience-based, and when information sources become less idiosyncratic and episodic, planning firms’ evaluations of their value begin to approximate the ratings given by non-planning firms. Furthermore, the concepts of relative value distance and value distance from threshold are original features of this study and offer new ways to evaluate the value of information sources for organizations wishing to provide information and support to improve business resilience and business continuity.

  19. Software configuration management plan for HANDI 2000 business management system

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, D.

    1998-08-25

    The Software Configuration Management Plan (SCMP) describes the configuration management and control environment for HANDI 2000 for the PP and PS software as well as any custom developed software. This plan establishes requirements and processes for uniform documentation control, system change control, systematic evaluation and coordination of HANDI 2000. This SCMP becomes effective as this document is acceptance and will provide guidance through implementation efforts.

  20. Exploring Space Management Goals in Institutional Care Facilities in China

    Science.gov (United States)

    Zhang, Jiankun

    2017-01-01

    Space management has been widely examined in commercial facilities, educational facilities, and hospitals but not in China's institutional care facilities. Poor spatial arrangements, such as wasted space, dysfunctionality, and environment mismanagement, are increasing; in turn, the occupancy rate is decreasing due to residential dissatisfaction. To address these problems, this paper's objective is to explore the space management goals (SMGs) in institutional care facilities in China. Systematic literature analysis was adopted to set SMGs' principles, to identify nine theoretical SMGs, and to develop the conceptual model of SMGs for institutional care facilities. A total of 19 intensive interviews were conducted with stakeholders in seven institutional care facilities to collect data for qualitative analysis. The qualitative evidence was analyzed through open coding, axial coding, and selective coding. As a result, six major categories as well as their interrelationships were put forward to visualize the path diagram for exploring SMGs in China's institutional care facilities. Furthermore, seven expected SMGs that were explored from qualitative evidence were confirmed as China's SMGs in institutional care facilities by a validation test. Finally, a gap analysis among theoretical SMGs and China's SMGs provided recommendations for implementing space management in China's institutional care facilities.

  1. Management Information Control Systems for Educational Facility Construction Programs.

    Science.gov (United States)

    Halverson, Walter S.

    1989-01-01

    Describes a computerized management information control system for an educational facility construction program that allows access to more than 50 major system applications, using over 5,000 programs. (MLF)

  2. Facilities of management magnetoresistive transformer of active power

    Directory of Open Access Journals (Sweden)

    Val. S. Vuntesmeri

    2009-03-01

    Full Text Available Management facilities are considered, spectral composition is certain and the form of коммутируемого signal of magnetoresistive transformer of active power is rotined.

  3. Myopia management: multihospital portfolio planning.

    Science.gov (United States)

    Irish, G G

    1987-10-01

    The acquisition and divestiture of organizational business units demonstrate management's strategy in response to an evolving marketplace. From a strategic perspective, the most significant danger to a corporation is not having the "right" portfolio of businesses or products to respond to the marketplace. This article describes a conceptual model that a multihospital system executive might use to determine the growth and diversification of the organization's portfolio of businesses. The model involves the application of market, financial, and microeconomic theories in a logical sequence to assist management in making business acquisition and divestiture decisions.

  4. 18 CFR 740.4 - State water management planning program.

    Science.gov (United States)

    2010-04-01

    ... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State...) The integration of water quantity and water quality planning and management; (ii) The protection and... integration of ground and surface water planning and management; and (v) Water conservation. (4) Identify...

  5. 78 FR 23491 - National Forest System Land Management Planning; Correction

    Science.gov (United States)

    2013-04-19

    ... Forest Service 36 CFR Part 219 RIN 0596-AB86 National Forest System Land Management Planning; Correction...-1104. FOR FURTHER INFORMATION CONTACT: Ecosystem Management Coordination staff's Planning Specialist... management plans (the planning rule). The National Forest Management Act (NFMA) at 16 U.S.C. 1604(g)(3)(D...

  6. National Waste Terminal Storage Program: management and technical program plan, FY 1976--FY 1978. [Information is obsolete and of historical interest only

    Energy Technology Data Exchange (ETDEWEB)

    1976-04-21

    The discussion on the management plan covers the program, responsibilities, general program schedule and logic, Office of Waste Isolation organization and facilities, management approach, administrative plan, and public affairs plan. The technical program plan includes geological studies, technical support studies, engineering studies, waste facility projects, environmental studies, system studies, data management, and international activities. The information contained in this report is obsolete and of historical interest only. (LK)

  7. Guidelines for Management Information Systems in Canadian Health Care Facilities

    OpenAIRE

    Thompson, Larry E.

    1987-01-01

    The MIS Guidelines are a comprehensive set of standards for health care facilities for the recording of staffing, financial, workload, patient care and other management information. The Guidelines enable health care facilities to develop management information systems which identify resources, costs and products to more effectively forecast and control costs and utilize resources to their maximum potential as well as provide improved comparability of operations.

  8. Test plan for the soils facility demonstration: A petroleum contaminated soil bioremediation facility

    Energy Technology Data Exchange (ETDEWEB)

    Lombard, K.H.

    1994-08-01

    The objectives of this test plan are to show the value added by using bioremediation as an effective and environmentally sound method to remediate petroleum contaminated soils (PCS) by: demonstrating bioremediation as a permanent method for remediating soils contaminated with petroleum products; establishing the best operating conditions for maximizing bioremediation and minimizing volatilization for SRS PCS during different seasons; determining the minimum set of analyses and sampling frequency to allow efficient and cost-effective operation; determining best use of existing site equipment and personnel to optimize facility operations and conserve SRS resources; and as an ancillary objective, demonstrating and optimizing new and innovative analytical techniques that will lower cost, decrease time, and decrease secondary waste streams for required PCS assays.

  9. Double-O Habitat Management Plan: Malheur National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Double-0 Plan is a step-down plan of the 1985 Refuge Master Plan and Environmental Assessment. The purpose of this plan is to guide the management, protection,...

  10. A review of sustainable facilities management knowledge and practice

    Directory of Open Access Journals (Sweden)

    Baaki Timothy Kurannen

    2016-01-01

    Full Text Available Sustainability is seen as a far-reaching issue now, and one which the facilities management [FM] profession cannot overlook. This paper explores current sustainable facilities management [SFM] knowledge and practice with specific focus on performance as part of a research focus toward proposing a sustainable FM performance management framework for sustainable healthcare waste management in Malaysia. This paper utilized a review of extant literature on the subject of SFM, FM performance and FM development in Malaysia as source of information. Findings reflect the increasing recognition of the need for the strategic FM function, and how facilities managers are best positioned to drive organizations’ sustainability agendas. In Malaysian context, this recognition is barely evident as findings show FM practice is still immature and predominantly operational. Unlike developed FM markets, FM relevance in Malaysia is being driven by the public sector. Also findings show a disharmony between organizations’ sustainability priority areas and the responsibilities for facilities managers to execute them where the sustainability policy of organizations prioritize one FM service and the facilities managers’ responsibilities prioritize another. As most of SFM implementation is driven by legislation this seems to strengthen the position that, organizations continue to view support services as non-value-adding, as unavoidable liabilities. The implication of this is the pressure on the FM function to continually express its strategic relevance to organizations by tangible value-adding performance output. This creates a new perspective to measuring and managing facilities performance. This paper therefore elevates the importance of FM performance management in SFM context taking into account the peculiar position of the facilities manager. This is seen as a way forward for FM to better express its value to the organization

  11. Hanford cultural resources management plan

    Energy Technology Data Exchange (ETDEWEB)

    Chatters, J.C. (ed.)

    1989-06-01

    As a federal agency, the US Department of Energy (DOE) has been directed by Congress and the President to provide leadership in the preservation of prehistoric, historical, and cultural resources on lands it administers, to manage these in a spirit of stewardship for future generations, and to protect and preserve the rights of Native Americans to religious freedom. The purpose of this document is to describe how the DOE-Richland Operations (DOE-RL) will meet those responsibilities on the Hanford Site, pursuant to guidelines for Agency Responsibilities under the Historic Preservation Act (FR 53:31, February 17, 1988). This document is intended for multiple uses. Among other things, the text is designed as a manual for cultural resource managers to follow and as an explanation of the process of cultural resource regulatory compliance for the DOE-RL and Site contractors. 10 refs., 17 figs., 11 tabs.

  12. Managing Educational Facilities and Students' Enrolment in ...

    African Journals Online (AJOL)

    DR Nneka

    The basic focus in any higher institution is on Educational Facilities and its ... Adesina (1981) reviewed that many abandoned and uncompleted school plant .... Correlation Co-efficient and Multiple Regression was used for the data. ... structure of the school building structure could interpret the large extent of students'.

  13. Adaptive management: a paradigm for remediation of public facilities following a terrorist attack.

    Science.gov (United States)

    Whicker, Jeffrey J; Janecky, David R; Doerr, Ted B

    2008-10-01

    Terrorist actions are aimed at maximizing harm (health, psychological, economical, and political) through the combined physical impacts of the act and fear. Immediate and effective response to a terrorist act is critical to limit human and environmental harm, effectively restore facility function, and maintain public confidence. Though there have been terrorist attacks in public facilities that we have learned from, overall our experiences in restoration of public facilities following a terrorist attack are limited. Restoration of public facilities following a release of a hazardous material is inherently far more complex than in industrial settings and has many unique technical, economic, social, and political challenges. For example, there may be a great need to quickly restore the facility to full operation and allow public access even though it was not designed for easy or rapid restoration, and critical information is needed for quantitative risk assessment and effective restoration must be anticipated to be incomplete and uncertain. Whereas present planning documents have substantial linearity in their organization, the "adaptive management" paradigm provides a constructive parallel paradigm for restoration of public facilities that anticipates and plans for uncertainty, inefficiencies, and stakeholder participation. Adaptive management grew out of the need to manage and restore natural resources in highly complex and changing environments with limited knowledge about causal relationships and responses to restoration actions. Similarities between natural resource management and restoration of a public facility after a terrorist attack suggest that integration of adaptive management principles explicitly into restoration processes will result in substantially enhanced and flexible responses necessary to meet the uncertainties of potential terrorist attacks.

  14. DNFSB Recommendation 94-1 Hanford site integrated stabilization management plan, volumes 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    Gerber, E.W.

    1996-03-15

    This document comprises the Hanford Site Integrated Stabilization Management Plan (SISMP). This document describes the DOE`s plans at the Hanford Site to address concerns identified in Defense Nuclear Facilites Safety Board (DNFSB) Recommendation 94-1. This document also identifies plans for other spent nuclear fuel (SNF) inventories at the Hanford Site which are not within the scope of DNFSB Recommendation 94-1 for reference purposes because of their interrelationship with plans for SNF within the scope of DNFSB Recommendation 94-1. The SISMP was also developed to assist DOE in initial formulation of the Research and Development Plan and the Integrated Facilities Plan.

  15. BUSINESS PLAN AS A MANAGEMENT TOOL

    Directory of Open Access Journals (Sweden)

    BRAG Ă FILOFTEIA VIORICA

    2013-02-01

    Full Text Available Most business people think of the business plans when they starting a new business or submitting documentation for accessing the funding source. The business plan involves a thinking perspective on the business, beginning from the set objectives, includes all the stages and resources they need to achieve them over a period of time. Therefore, in this article, we emphasize that they are equally useful for the daily management of a business, even if a business needs or not the new investment. Businesses need plans to optimize the growth and the development in accordance with the priorities.

  16. HWMA/RCRA Closure Plan for the TRA Fluorinel Dissolution Process Mockup and Gamma Facilities Waste System

    Energy Technology Data Exchange (ETDEWEB)

    K. Winterholler

    2007-01-31

    This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan was developed for the Test Reactor Area Fluorinel Dissolution Process Mockup and Gamma Facilities Waste System, located in Building TRA-641 at the Reactor Technology Complex (RTC), Idaho National Laboratory Site, to meet a further milestone established under the Voluntary Consent Order SITE-TANK-005 Action Plan for Tank System TRA-009. The tank system to be closed is identified as VCO-SITE-TANK-005 Tank System TRA-009. This closure plan presents the closure performance standards and methods for achieving those standards.

  17. 40 CFR 130.6 - Water quality management plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Water quality management plans. 130.6... QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM...) The functions to be exercised by the Indian Tribe pertain to the management and protection of...

  18. Evaporation Of Hanford Waste Treatment Plant Direct Feed Low Activity Waste Effluent Management Facility Core Simulant

    Energy Technology Data Exchange (ETDEWEB)

    Adamson, D. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Nash, C. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Mcclane, D. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); McCabe, D. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2016-09-01

    The Hanford Waste Treatment and Immobilization Plant (WTP) Low Activity Waste (LAW) vitrification facility will generate an aqueous condensate recycle stream (LAW Melter Off-Gas Condensate, LMOGC) from the off-gas system. The baseline plan for disposition of this stream during full WTP operations is to send it to the WTP Pretreatment Facility, where it will be blended with LAW, concentrated by evaporation, and recycled to the LAW vitrification facility. However, during the Direct Feed LAW (DFLAW) scenario, planned disposition of this stream is to evaporate it in a new evaporator, in the Effluent Management Facility (EMF), and then return it to the LAW melter. It is important to understand the composition of the effluents from the melter, and new evaporator so that the disposition of these streams can be accurately planned and accommodated. Furthermore, alternate disposition of the LMOGC stream would eliminate recycling of problematic components, and would reduce the need for closely integrated operation of the LAW melter and the Pretreatment Facilities. Long-term implementation of this option after WTP start-up would decrease the LAW vitrification mission duration and quantity of glass waste, amongst the other operational complexities such a recycle stream presents. In order to accurately plan for the disposition path, it is key to experimentally determine the fate of contaminants. To do this, testing is needed to accurately account for the buffering chemistry of the components, determine the achievable evaporation end point, identify insoluble solids that form, and determine the distribution of key regulatory-impacting constituents.

  19. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1998

    Energy Technology Data Exchange (ETDEWEB)

    Haagenstad, T.

    1999-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP) to protect workers, soils, water, and biotic and cultural resources in and around the facility.

  20. Family and Consumer Sciences: A Facility Planning and Design Guide for School Systems.

    Science.gov (United States)

    Maryland State Dept. of Education, Baltimore.

    This document presents design concepts and considerations for planning and developing middle and high school family and consumer sciences education facilities. It includes discussions on family and consumer sciences education trends and the facility planning process. Design concepts explore multipurpose laboratories and spaces for food/nutrition…

  1. Using care plans to better manage multimorbidity

    Directory of Open Access Journals (Sweden)

    Mark AJ Morgan

    2015-09-01

    Full Text Available Background The health care for patients having two or more long-term medical conditions is fragmented between specialists, allied health professionals, and general practitioners (GPs, each keeping separate medical records. There are separate guidelines for each disease, making it difficult for the GP to coordinate care. The TrueBlue model of collaborative care to address key problems in managing patients with multimorbidity in general practice previously reported outcomes on the management of multimorbidities. We report on the care plan for patients with depression, diabetes, and/or coronary heart disease that was embedded in the TrueBlue study. Methods A care plan was designed around diabetes, coronary heart disease, and depression management guidelines to prompt implementation of best practices and to provide a single document for information from multiple sources. It was used in the TrueBlue trial undertaken by 400 patients (206 intervention and 194 control from 11 Australian general practices in regional and metropolitan areas. Results Practice nurses and GPs successfully used the care plan to achieve the guideline-recommended checks for almost all patients, and successfully monitored depression scores and risk factors, kept pathology results up to date, and identified patient priorities and goals. Clinical outcomes improved compared with usual care. Conclusion The care plan was used successfully to manage and prioritise multimorbidity. Downstream implications include improving efficiency in patient management, and better health outcomes for patients with complex multimorbidities.

  2. Using care plans to better manage multimorbidity.

    Science.gov (United States)

    Morgan, Mark Aj; Coates, Michael J; Dunbar, James A

    2015-01-01

    The health care for patients having two or more long-term medical conditions is fragmented between specialists, allied health professionals, and general practitioners (GPs), each keeping separate medical records. There are separate guidelines for each disease, making it difficult for the GP to coordinate care. The TrueBlue model of collaborative care to address key problems in managing patients with multimorbidity in general practice previously reported outcomes on the management of multimorbidities. We report on the care plan for patients with depression, diabetes, and/or coronary heart disease that was embedded in the TrueBlue study. A care plan was designed around diabetes, coronary heart disease, and depression management guidelines to prompt implementation of best practices and to provide a single document for information from multiple sources. It was used in the TrueBlue trial undertaken by 400 patients (206 intervention and 194 control) from 11 Australian general practices in regional and metropolitan areas. Practice nurses and GPs successfully used the care plan to achieve the guideline-recommended checks for almost all patients, and successfully monitored depression scores and risk factors, kept pathology results up to date, and identified patient priorities and goals. Clinical outcomes improved compared with usual care. The care plan was used successfully to manage and prioritise multimorbidity. Downstream implications include improving efficiency in patient management, and better health outcomes for patients with complex multimorbidities.

  3. 78 FR 65751 - Integrated Corridor Management Deployment Planning Grants

    Science.gov (United States)

    2013-11-01

    ... Federal Highway Administration Integrated Corridor Management Deployment Planning Grants AGENCY: Federal... States, Metropolitan Planning Organizations (MPO), and local governments that intend to initiate or continue Integrated Corridor Management (ICM) development with their partners, such as arterial management...

  4. Defense System Software Management Plan

    Science.gov (United States)

    1976-03-01

    quality assurance discipline " Lack of quantitative data base for feedback of "lessons learned" 2. Actions to be Taken a. Service policies will be...and identify where they could be improved. Feedback from the field will be incorporated in updated versions of the guidelines and a cor cinued...c~0 .00 0 u 0 Efl ) 0 0 H 11-4 " . 00 oo Wro o,_ U ) z I QI- (n 0 0~ wH 000 1-5 MANAGEMENT PRACTICE AND PROCEDURE The action vehicle envf.sioned for

  5. Life Sciences Space Station planning document: A reference payload for the Life Sciences Research Facility

    Science.gov (United States)

    1986-01-01

    The Space Station, projected for construction in the early 1990s, will be an orbiting, low-gravity, permanently manned facility providing unprecedented opportunities for scientific research. Facilities for Life Sciences research will include a pressurized research laboratory, attached payloads, and platforms which will allow investigators to perform experiments in the crucial areas of Space Medicine, Space Biology, Exobiology, Biospherics and Controlled Ecological Life Support System (CELSS). These studies are designed to determine the consequences of long-term exposure to space conditions, with particular emphasis on assuring the permanent presence of humans in space. The applied and basic research to be performed, using humans, animals, and plants, will increase our understanding of the effects of the space environment on basic life processes. Facilities being planned for remote observations from platforms and attached payloads of biologically important elements and compounds in space and on other planets (Exobiology) will permit exploration of the relationship between the evolution of life and the universe. Space-based, global scale observations of terrestrial biology (Biospherics) will provide data critical for understanding and ultimately managing changes in the Earth's ecosystem. The life sciences community is encouraged to participate in the research potential the Space Station facilities will make possible. This document provides the range and scope of typical life sciences experiments which could be performed within a pressurized laboratory module on Space Station.

  6. Facilities Management Practices in Malaysia: A Literature Review

    Directory of Open Access Journals (Sweden)

    Isa Nordiana Mohd

    2016-01-01

    Full Text Available Facilities management in Malaysia has been practiced for decades. The development of its formal practice parallels the improvement of the built environment in the nation. Involvement of the public and private sectors teaming up in arranging the National Asset and Facilities Management (NAFAM in demonstrates the vital collaboration in the facilities management area in Malaysia. Facilities management is seen distinctively as indicated by diverse geographical locations, interests and schools of thought. Facilities management is delegated a service-based industry which gives proficient counsel and administration of clients’ building facilities including residential, commercial, industrial, airports terminals and offices. The aim of this paper is to review the gaps that exist, especially on how FM is being practice in comparison with the published FM body of knowledge. Very relying upon literature, this paper discovered a gap that is an unclear description of current FM applications. This research aims to give new bits of knowledge to upgrade comprehension of FM execution in Malaysia.

  7. Post-Occupancy Evaluation Data Support for Planning and Management of Building Maintenance Plans

    Directory of Open Access Journals (Sweden)

    Nelson Bento Pereira

    2016-10-01

    Full Text Available The purpose of this paper is to propose a post-occupancy evaluation (POE method focused on building maintenance and then to test it on two different sets of residential buildings. The paper’s three main goals are: to obtain useful data for optimizing the buildings’ maintenance plans; to search for any correlation between the occupants’ characteristics and their expectations toward the building; to study the occupants’ willingness to pay for maintenance procedures, as well as its correlation with the occupants’ perception of the elements source of maintenance (ESM. The proposed POE method for building maintenance performance evaluation (BMPE consists of six main stages, focusing on the occupants’ opinions and their correlation with the facility manager’s. The observed case studies allowed for a preliminary validation of the POE method for BMPE. Results generically endorsed the method as a valuable tool for the rapprochement between facility management and the building’s end-users. Such findings could allow facility managers to develop more efficient maintenance plans focusing on the occupants’ real needs and expectations, raising occupant satisfaction levels and contributing to the building’s general performance.

  8. Development of decommissioning management system for nuclear fuel cycle facilities (DECMAN)

    Energy Technology Data Exchange (ETDEWEB)

    Ogawa, Ryuichirou; Ishijima, Noboru; Tanimoto, Ken-ichi [Japan Nuclear Cycle Development Inst., Oarai, Ibaraki (Japan). Oarai Engineering Center

    1999-04-01

    In making a plan of decommissioning of nuclear fuel facilities, it is important to optimize the plan on the standpoint of a few viewpoints, that is, the amount of working days, workers, radioactive waste, exposure dose of worker, and cost (they are called evaluation indexes). In the midst of decommissioning, the decommissioning plan would be modified suitably to optimize the evaluation indexes adjusting to progress of the decommissioning. The decommissioning management code (DECMAN), that is support system on computer, has been developed to assist the decommissioning planning. The system calculates the evaluation indexes quantitatively. The system consists of three fundamental codes, facility information database code, technical know-how database code and index evaluation code, they are composed using Oracle' database and 'G2' expert system. The functions of the system are as follows. (1) Facility information database code. Information of decommissioning facility and its rooms, machines and pipes in the code. (2) Technical know-how database code. Technical Information of tools to use in decommissioning work, cutting, dose measure, and decontamination are there. (3) Index evaluation code. User build decommissioning program using above two database codes. The code evaluates five indexes, the amount of working days, workers, radioactive waste, exposure dose of worker, and cost, on planning decommissioning program. Results of calculation are shown in table, chart, and etc. (author)

  9. Hanford site integrated pest management plan

    Energy Technology Data Exchange (ETDEWEB)

    Giddings, R.F.

    1996-04-09

    The Hanford Site Integrated Pest Management Plan (HSIPMP) defines the Integrated Pest Management (IPM) decision process and subsequent strategies by which pest problems are to be solved at all Hanford Site properties per DOE-RL Site Infrastructure Division memo (WHC 9505090). The HSIPMP defines the roles that contractor organizations play in supporting the IPM process. In short the IPM process anticipates and prevents pest activity and infestation by combining several strategies to achieve long-term pest control solutions.

  10. The planning of decommissioning activities within nuclear facilities - Generating a Baseline Decommissioning Plan

    Energy Technology Data Exchange (ETDEWEB)

    Meek, N.C.; Ingram, S.; Page, J. [BNFL Environmental Services (United Kingdom)

    2003-07-01

    BNFL Environmental Services has developed planning tools to meet the emerging need for nuclear liabilities management and decommissioning engineering both in the UK and globally. It can provide a comprehensive baseline planning service primarily aimed at nuclear power stations and nuclear plant. The paper develops the following issues: Decommissioning planning; The baseline decommissioning plan;The process; Work package; Compiling the information; Deliverables summary; Customer Benefits; - Planning tool for nuclear liability life-cycle management; - Robust and reliable plans based upon 'real' experience; - Advanced financial planning; - Ascertaining risk; - Strategy and business planning. The following Deliverables are mentioned:1. Site Work Breakdown Structure; 2. Development of site implementation strategy from the high level decommissioning strategy; 3. An end point definition for the site; 4. Buildings, operational systems and plant surveys; 5. A schedule of condition for the site; 6. Development of technical approach for decommissioning for each work package; 7. Cost estimate to WBS level 5 for each work package; 8. Estimate of decommissioning waste arisings for each work package; 9. Preparation of complete decommissioning programme in planning software to suit client; 10. Risk modelling of work package and overall project levels; 11. Roll up of costs into an overall cost model; 12. Cash flow, waste profiling and resource profiling against the decommissioning programme; 13. Preparation and issue of Final Report. Finally The BDP process is represented by a flowchart listing the following stages: [Power Station project assigned] {yields} [Review project and conduct Characterisation review of power station] {yields} [Identify work packages] {yields} [Set up WBS to level 3] {yields} [Assign work packages] {yields} [Update WBS to level 4] {yields}[Develop cost model] {yields} [Develop logic network] {yields} [Develop risk management procedure] ] {yields

  11. Form planning Control to growth management

    DEFF Research Database (Denmark)

    Enemark, Stig

    2016-01-01

    The 1950s marked the birth of comprehensive planning in Denmark, when a number of socio-spatial challenges emerged as a result of the country’s rapid economic growth. These challenges were eventually addressed by the administrative reform of 1970 and the following planning reform implemented from...... caused that spatial planning be regarded more as a cost than an asset. Accordingly, it is evident that the Danish planning domain has progressively lost political clout and the focus is changed towards facilitation and management of economic growth.......The 1950s marked the birth of comprehensive planning in Denmark, when a number of socio-spatial challenges emerged as a result of the country’s rapid economic growth. These challenges were eventually addressed by the administrative reform of 1970 and the following planning reform implemented from...... 1970 until 1977. The reforms established an integrated planning system aiming to achieve spatial coordination through a hierarchy of plans occurring at multiple scales and a certain degree of horizontal and vertical integration of policies across sectors and jurisdictions. Since then, Denmark has been...

  12. 78 FR 25762 - Notice of Availability of the Final Trail Management Plan/Final Environmental Impact Statement...

    Science.gov (United States)

    2013-05-02

    ... facilities from the other action alternatives that the NPS believes would best fit Cuyahoga Valley National... trails management that best meets the goals of the plan and minimizes impacts to the resources of... facilities, and maintenance and best management practices. The Guidelines will serve as the Standard...

  13. Facilities Management research in the Nordic Countries

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2011-01-01

    This article provides a brief overview of the short history of FM research in Denmark, Norway, Sweden and Finland, and presents current research topics and trends in these countries. It is based on information originally collected as part of the planning for the Danish research programme that led...

  14. Public involvement in adaptive phased management of nuclear waste facilities

    Energy Technology Data Exchange (ETDEWEB)

    Chartrand, D. [Royal Roads Univ., Victoria, British Columbia (Canada); Donev, J. [Univ. of Calgary, Calgary, Alberta (Canada)

    2012-07-01

    If a community is going to host a waste facility that community must be informed about nuclear waste disposal and willing to house the facility permanently. This talk will discuss the process for distributing information to primary and secondary stakeholders; investigate the accessibility and transparency of public information and assess the ability to dialogue between stakeholders when issues are raised in the context of adaptive phased management? We will also examine transparency in the process of managing conflict by looking at some of the issues at hand and how those issues are currently being managed through stakeholder engagement.

  15. Management Matters: Planning Goals and Time

    Science.gov (United States)

    Pappas, Marjorie L.

    2004-01-01

    This article discusses the importance of setting and implementing goals that can help change and improve a library media program over time--goals that go beyond merely keeping the library media center running. Suggestions for developing an action plan and strategies for effective time management are also presented.

  16. Grasslands Management Plan : Tamarac National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The goal of this Grassland Management Plan for Tamarac NWR is to provide a variety of quality grasslands, by the year 1999 totaling 2,500 acres and eventually 5,000...

  17. Hanford emergency management plan - release 15

    Energy Technology Data Exchange (ETDEWEB)

    CARPENTER, G.A.

    1999-07-19

    The Hanford emergency management plan for the US Department of Energy Richland, WA and Office of River Protection. The program was developed in accordance with DOE Orders as well as Federal and State regulations to protect workers and public health and safety.

  18. SEA of river basin management plans

    DEFF Research Database (Denmark)

    Larsen, Sanne Vammen; Kørnøv, Lone

    2009-01-01

    In, 2000 the European Parliament and the European Council passed the Water Framework Directive (WFD) to be implemented in all Member States. The consequence of the directive is that river basin management plans (RBMPs) shall be prepared which are legally subject to a strategic environmental...

  19. Outcomes Oriented Planning, Management, and Evaluation.

    Science.gov (United States)

    Kinnison, Charles J.

    An outcomes orientation is examined as the dominant focus for formulating improvements in a college's planning, management, and evaluation (PME) system. Outcomes are seen as individual (produced by college personnel or students), program related, or institutional. An outcomes orientation to PME has the advantages of relating to the quality of…

  20. BIM Guidelines Inform Facilities Management Databases: A Case Study over Time

    Directory of Open Access Journals (Sweden)

    Karen Kensek

    2015-08-01

    Full Text Available A building information model (BIM contains data that can be accessed and exported for other uses during the lifetime of the building especially for facilities management (FM and operations. Working under the guidance of well-designed BIM guidelines to insure completeness and compatibility with FM software, architects and contractors can deliver an information rich data model that is valuable to the client. Large owners such as universities often provide these detailed guidelines and deliverable requirements to their building teams. Investigation of the University of Southern California (USC Facilities Management Service’s (FMS website showed a detailed plan including standards, file names, parameter lists, and other requirements of BIM data, which were specifically designated for facilities management use, as deliverables on new construction projects. Three critical details were also unearthed in the reading of these documents: Revit was the default BIM software; COBie was adapted to help meet facilities management goals; and EcoDomus provided a display of the collected data viewed through Navisworks. Published accounts about the Cinema Arts Complex developed with and under these guidelines reported positive results. Further examination with new projects underway reveal the rapidly changing relational database landscape evident in the new USC “Project Record Revit Requirement Execution Plan (PRxP”.

  1. Guidelines for Development of a Base Comprehensive Plan to Manage Military Construction.

    Science.gov (United States)

    1985-09-01

    Communications - Transportation * Facilities - Energy - Architectural Compatibility - Landscape Planning / Design - Facilities Development - Fire Protection 38...Guidelines - Base Landscape Development Plan: 1. Landscape Design 2. Landscape Planning 3. Landscape Development Phasing M. Long Range Facilities

  2. Management strategies in hospitals: scenario planning

    Directory of Open Access Journals (Sweden)

    Ghanem, Mohamed

    2015-06-01

    Full Text Available Background: Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Methodology: Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a “Stakeholder Feedback”. Results: Two key uncertainties were identified and considered in this study: According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Conclusion: Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and “blind spots”. This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management.

  3. Land Management and Means of Planning Control

    DEFF Research Database (Denmark)

    Enemark, Stig

    2006-01-01

    The paper presents an overall understanding of the Land Management Paradigm for Sustainable Development. It is argued that such an understanding is important for facilitating a holistic approach to the management of land, properties, and natural resources being the key assets of any nation...... the historical and cultural developments of the European countries. Finally, the paper presents a short overview of the Danish approach to planning and landuse management as an example of a planning led approach placing the decision-making power especially at the local level. This concept of decentralization...... comprises a finely tuned relationship between a strong national authority and autonomous municipal councils. The purpose is to solve the tasks at the lowest possible level so as to combine responsibility for decision-making with accountability for financial, social, and environmental consequences. To put...

  4. Land Management and Means of Planning Control

    DEFF Research Database (Denmark)

    Enemark, Stig

    2006-01-01

    the historical and cultural developments of the European countries. Finally, the paper presents a short overview of the Danish approach to planning and landuse management as an example of a planning led approach placing the decision-making power especially at the local level. This concept of decentralization......The paper presents an overall understanding of the Land Management Paradigm for Sustainable Development. It is argued that such an understanding is important for facilitating a holistic approach to the management of land, properties, and natural resources being the key assets of any nation...... comprises a finely tuned relationship between a strong national authority and autonomous municipal councils. The purpose is to solve the tasks at the lowest possible level so as to combine responsibility for decision-making with accountability for financial, social, and environmental consequences. To put...

  5. Comprehensive Conservation Plan: Huron Wetland Management District, Madison Wetland Management District, Sand Lake Wetland Management District

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Huron Wetland Management District, Madison Wetland Management District, and Sand Lake...

  6. Strategic planning manager and management education in elementary education institutions

    Directory of Open Access Journals (Sweden)

    Kleeder José Bracho Pérez

    2013-10-01

    Full Text Available The purpose of this study was to determine the relationship between strategic planning and management of educational managers in primary schools of the parish municipality of Ricaurte Mara. The research was based on the theoretical bases of authors: Serna (2003, Chiavenato (2001, and Weihrich Koantz (2004, Pacheco, chestnut and Caicedo (2002 among others. The research was descriptive correlational design under a nonexperimental transactional field, the population consisted of 115 subjects between administrators and teachers, which the sample was taken and Tamayo Tamayo criterion; census. Data collection was conducted through two questionnaires (Brad for managers and (Brad for teachers each consisting of 42 items in Likert-type scale with four answer choices, which was validated by five experts and the reliability was calculated through Cronbach alpha coefficient was the result of which (0.95 for the questionnaire (Brad applied to directors and (0.90 for the questionnaire (Brad applied to teachers. The statistic used was descriptive using percentage tables. The results determined that the application of strategic planning by educational managers is low so there are weaknesses in management, we can say that there is a very high correlation (r = 0.89 between strategic planning and management of the educational manager in primary schools of the parish municipality of Ricaurte Mara. 

  7. Knowledge management and information tools for building maintenance and facility management

    CERN Document Server

    Talamo, Cinzia

    2015-01-01

    This book describes the latest methods and tools for the management of information within facility management services and explains how it is possible to collect, organize, and use information over the life cycle of a building in order to optimize the integration of these services and improve the efficiency of processes. The coverage includes presentation and analysis of basic concepts, procedures, and international standards in the development and management of real estate inventories, building registries, and information systems for facility management. Models of strategic management are discussed and the functions and roles of the strategic management center, explained.  Detailed attention is also devoted to building information modeling (BIM) for facility management and potential interactions between information systems and BIM applications. Criteria for evaluating information system performance are identified, and guidelines of value in developing technical specifications for facility management service...

  8. The Mixed Waste Management Facility. Preliminary design review

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    This document presents information about the Mixed Waste Management Facility. Topics discussed include: cost and schedule baseline for the completion of the project; evaluation of alternative options; transportation of radioactive wastes to the facility; capital risk associated with incineration; radioactive waste processing; scaling of the pilot-scale system; waste streams to be processed; molten salt oxidation; feed preparation; initial operation to demonstrate selected technologies; floorplans; baseline revisions; preliminary design baseline; cost reduction; and project mission and milestones.

  9. The Mixed Waste Management Facility. Preliminary design review

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    This document presents information about the Mixed Waste Management Facility. Topics discussed include: cost and schedule baseline for the completion of the project; evaluation of alternative options; transportation of radioactive wastes to the facility; capital risk associated with incineration; radioactive waste processing; scaling of the pilot-scale system; waste streams to be processed; molten salt oxidation; feed preparation; initial operation to demonstrate selected technologies; floorplans; baseline revisions; preliminary design baseline; cost reduction; and project mission and milestones.

  10. Closure Plan for the E-Area Low-Level Waste Facility

    Energy Technology Data Exchange (ETDEWEB)

    Cook, J.R.

    2000-10-30

    A closure plan has been developed to comply with the applicable requirements of the U.S. Department of Energy Order 435.2 Manual and Guidance. The plan is organized according to the specifications of the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans.

  11. Facilities Management and Value Adding - The LEGO case

    DEFF Research Database (Denmark)

    Jensen, Per Anker; Katchamart, Akarapong

    on the management model for FM included in the European FM standards, recent theories on added value of FM and real estate and the related concept of Value Management from building projects. The paper outlines a preliminary theoretical based management concept, which is investigated, tested and discussed based...... on a case study of LEGO. Results: The study shows that the management model for FM creates a relevant starting point but also that stakeholder and relationship management is an essential aspect of Value Adding Management. The case study confirms the relevance of the basic concept and provides an important...... example of how Value Adding Management can be implemented and added value measured. Practical Implications: The concept of Value Adding Management is expected to increase the awareness of the impacts and strategic importance of FM for organisations and can be a practical tool for facilities managers...

  12. Determinants of Quality of Family Planning Counseling among Private Health Facilities in Lagos.

    Science.gov (United States)

    Johnson, Doug; Ugaz, Jorge

    2016-09-01

    We use a unique dataset that includes an objective measure of the quality of family planning counseling from 927 private health facilities in Lagos State, Nigeria, to determine which variables at the facility and provider levels are most closely correlated with the quality of family planning counseling. Our data on quality come from mystery client surveys in which the clients posed as women seeking family planning counseling. We find that quality is strongly associated with the cadre of provider, with doctors delivering substantially higher-quality counselling than nurses. Doctors not only outperform nurses overall, but also perform better on each category of quality and spend nearly three minutes longer on average counseling the mystery client. Location, fees charged for the service, and facility type are also strongly correlated with quality. The degree to which a facility specializes in family planning and facility size are only weakly predictive of quality.

  13. AVLIS Production Plant Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1984-11-15

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables.

  14. STORMWATER BEST MANAGEMENT PRACTICES TEST FACILITY - SWALES

    Science.gov (United States)

    The NRMRL swale evaluation is part of a larger collection of long-term research projects that evaluates many Best Management Practices. EPA has ongoing research examining the performance of constructed wet lands, and detention and retention ponds. Other projects will evaluate ra...

  15. Central Facilities Area Facilities Radioactive Waste Management Basis and DOE Manual 435.1-1 Compliance Tables

    Energy Technology Data Exchange (ETDEWEB)

    Lisa Harvego; Brion Bennett

    2011-11-01

    Department of Energy Order 435.1, 'Radioactive Waste Management,' along with its associated manual and guidance, requires development and maintenance of a radioactive waste management basis for each radioactive waste management facility, operation, and activity. This document presents a radioactive waste management basis for Idaho National Laboratory's Central Facilities Area facilities that manage radioactive waste. The radioactive waste management basis for a facility comprises existing laboratory-wide and facilityspecific documents. Department of Energy Manual 435.1-1, 'Radioactive Waste Management Manual,' facility compliance tables also are presented for the facilities. The tables serve as a tool for developing the radioactive waste management basis.

  16. Optical Networks Solutions planning - performances - management

    DEFF Research Database (Denmark)

    Fenger, Christian

    2002-01-01

    are kept optical and not converted into the optical domain. The focus is on the scientific results achieved throughout the Ph.D. period. Five subjects – all increasing the understanding of optical networks – are studied. Static wavelength routed optical networks are studied. Management on terms...... is up to two wavelengths, significant capacity savings are possible. Network planning in the form of optimal design of national and regional telecommunication networks is thoroughly studied and promising computer programs and methods are developed. In the optimization process are both duct, fiber......, and switch equipment cost considered. The contribution in network planning are one of the most important contributions with direct usability....

  17. Black-tailed prairie dog management plan : Rainwater Basin Wetland Management District

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This management plan is for management of black-tailed prairie dogs on the Rainwater Basin Wetland Management District , Nebraska. A management plan is needed for...

  18. Crisis planning to manage risks posed by animal rights extremists.

    Science.gov (United States)

    Bailey, Matthew R; Rich, Barbara A; Bennett, B Taylor

    2010-01-01

    Among the multitude of crises that US research institutions may face are those caused by animal rights activists. While most activists opposed to animal research use peaceful and lawful means of expressing their opinions, some extremists resort to illegal methods. Arson, break-ins, and theft with significant property damage at US animal research facilities began in the 1980s. The most troubling trend to develop in the past decade is the targeting of individuals associated with animal research, whether directly or indirectly, and the use of violent scare tactics to intimidate researchers and their families. The National Association for Biomedical Research has a 30-year history of monitoring the animal rights movement and assisting member institutions with crisis situations. In this article we discuss attacks on researchers at their homes, cyber crimes, exploitation of new media formats, infiltration of research facilities, and the targeting of external research stakeholders and business partners. We describe the need for a well-conceived crisis management plan and strong leadership to mitigate crisis situations. Institutions with well-informed leaders and crisis management teams ready to take timely action are best equipped to protect staff, laboratory animals, and research programs. They act on early warnings, provide support for targeted staff, seek legal remedies, thoughtfully control access to research facilities, and identify and enlist new research supporters. We underscore the importance of up-to-date crisis planning so that institutions are not only aware of ongoing risks posed by animal rights extremists but also better prepared to take preemptive action and able to manage those risks successfully.

  19. Atmospheric Reentry Materials and Structures Evaluation Facility (ARMSEF). User Test Planning Guide

    Science.gov (United States)

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ARMSEF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  20. A Health Facility Planning Methodology for Army Troop Medical Clinics.

    Science.gov (United States)

    1981-04-01

    Herbert H. Hyman, Basic Health Planning Methods, (Germantown, Md: Aspen Systems Corp., 1978), p.14 . 16 17 1 3James A. Rice, " Interinstitutional Planning...another for collaboration throughout the developmental process in order for that project to come to fruition. In the final analysis, the planning...Space Needs." Hospitals 54 (December 16, 1980): 109-112. Rice, James A. " Interinstitutional Planning Process, Part 1. Free Standing Hospitals." Hospitals

  1. Længerevarende samarbejder inden for Facilities Management

    DEFF Research Database (Denmark)

    Storgaard, Kresten; Friis, Freja

    Længerevarende strategiske samarbejde er interessant, fordi det anses for en måde at fremme produktivitet og forretning for både kunder og leverandører. I rapportenfremlægges resultaterne fra en caseanalyse blandt leverandører og købere af Facilities Management.......Længerevarende strategiske samarbejde er interessant, fordi det anses for en måde at fremme produktivitet og forretning for både kunder og leverandører. I rapportenfremlægges resultaterne fra en caseanalyse blandt leverandører og købere af Facilities Management....

  2. Længerevarende samarbejder inden for Facilities Management

    DEFF Research Database (Denmark)

    Storgaard, Kresten; Friis, Freja

    Længerevarende strategiske samarbejde er interessant, fordi det anses for en måde at fremme produktivitet og forretning for både kunder og leverandører. I rapportenfremlægges resultaterne fra en caseanalyse blandt leverandører og købere af Facilities Management.......Længerevarende strategiske samarbejde er interessant, fordi det anses for en måde at fremme produktivitet og forretning for både kunder og leverandører. I rapportenfremlægges resultaterne fra en caseanalyse blandt leverandører og købere af Facilities Management....

  3. Savannah River Site nuclear materials management plan FY 2017-2031

    Energy Technology Data Exchange (ETDEWEB)

    Magoulas, V. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-06-22

    The purpose of the Nuclear Materials Management Plan (herein referred to as “this Plan”) is to integrate and document the activities required to disposition the legacy and/or surplus Enriched Uranium (EU) and Plutonium (Pu) and other nuclear materials already stored or anticipated to be received by facilities at the Department of Energy (DOE) Savannah River Site (SRS) as well as the activities to support the DOE Tritium mission. It establishes a planning basis for EU and Pu processing operations in Environmental Management Operations (EMO) facilities through the end of their program missions and for the tritium through the National Nuclear Security Administration (NNSA) Defense Programs (DP) facilities. Its development is a joint effort among the Department of Energy - Savannah River (DOE-SR), DOE – Environmental Management (EM), NNSA Office of Material Management and Minimization (M3), NNSA Savannah River Field Office (SRFO), and the Management and Operations (M&O) contractor, Savannah River Nuclear Solutions, LLC (SRNS). Life-cycle program planning for Nuclear Materials Stabilization and Disposition and the Tritium Enterprise may use this Plan as a basis for the development of the nuclear materials disposition scope and schedule. This Plan assumes full funding to accomplish the required project and operations activities. It is recognized that some aspects of this Plan are pre decisional with regard to National Environmental Policy Act (NEPA); in such cases new NEPA actions will be required.

  4. 76 FR 54251 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2011-08-31

    ... Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are... Management Plans (Criteria). For the purpose of this announcement, Water Management Plans (Plans)...

  5. Conjunctive operation of river facilities for integrated water resources management in Korea

    Science.gov (United States)

    Kim, Hwirin; Jang, Cheolhee; Kim, Sung

    2016-10-01

    With the increasing trend of water-related disasters such as floods and droughts resulting from climate change, the integrated management of water resources is gaining importance recently. Korea has worked towards preventing disasters caused by floods and droughts, managing water resources efficiently through the coordinated operation of river facilities such as dams, weirs, and agricultural reservoirs. This has been pursued to enable everyone to enjoy the benefits inherent to the utilization of water resources, by preserving functional rivers, improving their utility and reducing the degradation of water quality caused by floods and droughts. At the same time, coordinated activities are being conducted in multi-purpose dams, hydro-power dams, weirs, agricultural reservoirs and water use facilities (featuring a daily water intake of over 100 000 m3 day-1) with the purpose of monitoring the management of such facilities. This is being done to ensure the protection of public interest without acting as an obstacle to sound water management practices. During Flood Season, each facilities contain flood control capacity by limited operating level which determined by the Regulation Council in advance. Dam flood discharge decisions are approved through the flood forecasting and management of Flood Control Office due to minimize flood damage for both upstream and downstream. The operational plan is implemented through the council's predetermination while dry season for adequate quantity and distribution of water.

  6. Conjunctive operation of river facilities for integrated water resources management in Korea

    Directory of Open Access Journals (Sweden)

    H. Kim

    2016-10-01

    Full Text Available With the increasing trend of water-related disasters such as floods and droughts resulting from climate change, the integrated management of water resources is gaining importance recently. Korea has worked towards preventing disasters caused by floods and droughts, managing water resources efficiently through the coordinated operation of river facilities such as dams, weirs, and agricultural reservoirs. This has been pursued to enable everyone to enjoy the benefits inherent to the utilization of water resources, by preserving functional rivers, improving their utility and reducing the degradation of water quality caused by floods and droughts. At the same time, coordinated activities are being conducted in multi-purpose dams, hydro-power dams, weirs, agricultural reservoirs and water use facilities (featuring a daily water intake of over 100 000 m3 day−1 with the purpose of monitoring the management of such facilities. This is being done to ensure the protection of public interest without acting as an obstacle to sound water management practices. During Flood Season, each facilities contain flood control capacity by limited operating level which determined by the Regulation Council in advance. Dam flood discharge decisions are approved through the flood forecasting and management of Flood Control Office due to minimize flood damage for both upstream and downstream. The operational plan is implemented through the council's predetermination while dry season for adequate quantity and distribution of water.

  7. The Top 10 Facility Design and Planning Solutions.

    Science.gov (United States)

    Kennedy, Mike

    2001-01-01

    Discussses the top issues facing schools as they build and renovate their facilities to meet the educational needs of the 21st Century. Issues include alternative school sites, ecologically friendly facilities, flexible spaces, outdoor spaces, schools as communities, smaller schools, security, technology, and school/community relationships. (GR)

  8. Des Lacs National Wildlife Refuge Water Management Plan 1995

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  9. Water Management Plan 1949 Moosehorn National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Moosehorn National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  10. Pocosin Lakes National Wildlife Refuge : 2006 Habitat Management Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2006 Annual Habitat Work Plan is an annual work plan that details incremental tasks in support of the Habitat Management Plan goals and objectives. The annual...

  11. Pocosin Lakes National Wildlife Refuge : 2009 Habitat Management Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2009 Annual Habitat Work Plan is an annual work plan that details incremental tasks in support of the Habitat Management Plan goals and objectives. The annual...

  12. Des Lacs National Wildlife Refuge Water Management Plan 1969

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  13. Water Management Plan 1950 Moosehorn National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Moosehorn National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  14. Water Management Plan Bombay Hook National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Bombay Hook Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan is to establish a...

  15. Des Lacs National Wildlife Refuge Water Management Plan 1961

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  16. Des Lacs National Wildlife Refuge Water Management Plan 1994

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Des Lacs National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  17. Pocosin Lakes National Wildlife Refuge : 2004 Habitat Management Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2004 Annual Habitat Work Plan is an annual work plan that details incremental tasks in support of the Habitat Management Plan goals and objectives. The annual...

  18. 33 CFR 154.1047 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Science.gov (United States)

    2010-07-01

    ... evaluation criteria for facilities that handle, store, or transport Group V petroleum oils. 154.1047 Section...) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Oil Facilities § 154.1047 Response plan development and evaluation criteria for facilities that handle, store, or...

  19. Strategic plan for Hanford site information management

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    The Hanford Site missions are to clean up the Site, to provide scientific knowledge and technology to meet global needs, and to partner in the economic diversification of the region. To achieve these long-term missions and increase confidence in the quality of the Site`s decision making process, a dramatically different information management culture is required, consistent with US Department of Energy (DOE) mandates on increased safety, productivity, and openness at its sites. This plan presents a vision and six strategies that will move the Site toward an information management culture that will support the Site missions and address the mandates of DOE.

  20. Yukon Flats National Wildlife Refuge Fishery. Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Yukon Flats National Wildlife Refuge Fishery Management Plan (Fishery Plan) provides comprehensive management direction to insure that fish species and habitats...

  1. Windom Wetland Management District: Comprehensive Conservation Plan and Environmental Assessment

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Windom Wetland Management District for the next 15 years. This plan outlines the...

  2. Forest Management Plan : Upper Mississippi River Wildlife & Fish Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Upper Mississippi National Wildlife and Fish Refuge Forest Management Plan is a general plan which outlines the refuge management objectives, forest...

  3. Rainwater Basin Wetland Management District: Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Rainwater Basin Wetland Management District for the next 15 years. This plan outlines...

  4. Grassland Management Plan: Union Slough National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The plan outlines grassland habitat management objectives for Union Slough National Wildilfe Refuge. The Grassland Management Plan objectives include; preserve...

  5. Comprehensive Conservation Plan: North Dakota Wetland Management Districts

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on North Dakota Wetland Management Districts for the next 15 years. This plan outlines the...

  6. Iowa Wetland Management District: Final Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on Iowa Wetland Management District for the next 15 years. This plan outlines the Refuge...

  7. Comprehensive hatchery management plan: Carson National Fish Hatchery

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Hatchery Management Plan (CHMP) for the Carson National Fish Hatchery (NFH) is an operational management plan which outlines policy, legal...

  8. Crab Orchard National Wildlife Refuge : Wilderness Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Crab Orchard National Wildlife Refuge Wilderness Management Plan is a general plan which outlines the Refuge management objectives, wilderness creation and...

  9. Ottawa National Wildlife Refuge : Integrated Pesticide Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of the Ottawa NWR Integrated Pest Management plan (IPM) is to provide a plan and a tool for adaptive management of invasive species on the Refuge. The...

  10. St. Croix Wetland Management District: Comprehensive Conservation Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Comprehensive Conservation Plan (CCP) was written to guide management on St. Croix Wetland Management District for the next 15 years. This plan outlines the...

  11. An Examination of the Structure of Sustainable Facilities Planning Scale for User Satisfaction in Nigerian Universities

    Directory of Open Access Journals (Sweden)

    Abayomi Ibiyemi

    2014-09-01

    Full Text Available Universities are under increasing pressure to demonstrate that continuous performance improvement is being delivered for user satisfaction, but the importance of facilities planning as a student-staff focused tool needs to be emphasised. This research sought answers to questions relating to the underlying structure of sustainable facilities planning and user satisfaction, and the number of factors that make up the facilities planning scale. Three universities from the south-western part of Nigeria were selected randomly using ownership structure to define the cases: University of Lagos, Akoka, Lagos, Ladoke Akintola University of Technology, Ogbomoso and Joseph Ayo Babalola University, Ikeji Arakeji, each representing the Federal, State, and Private ownership. A questionnaire survey was used on a random sample of 651 staff and students from the three universities. Six hundred questionnaires were retrieved (response rate of 92.2%. An exploratory factor analysis was used to understand the responses and the interrelationships. The results showed a two-factor solution of ‘locational advantages and user needs’ and ‘adequacy of facilities/functional connection and four core determinants for acceptance. It is concluded that universities should factor student-staff focus points into their facilities planning schemes to optimise their service deliveries. The study contributes to the discussion on factor structure of sustainable facilities planning scale with a focus on students and staff of universities. Keywords: Facilities planning, universities, data structure, factors, Nigeria.

  12. An Examination of the Structure of Sustainable Facilities Planning Scale for User Satisfaction in Nigerian Universities

    Directory of Open Access Journals (Sweden)

    Abayomi Ibiyemi

    2014-09-01

    Full Text Available Universities are under increasing pressure to demonstrate that continuous performance improvement is being delivered for user satisfaction, but the importance of facilities planning as a student-staff focused tool needs to be emphasised. This research sought answers to questions relating to the underlying structure of sustainable facilities planning and user satisfaction, and the number of factors that make up the facilities planning scale. Three universities from the south-western part of Nigeria were selected randomly using ownership structure to define the cases: University of Lagos, Akoka, Lagos, Ladoke Akintola University of Technology, Ogbomoso and Joseph Ayo Babalola University, Ikeji Arakeji, each representing the Federal, State, and Private ownership. A questionnaire survey was used on a random sample of 651 staff and students from the three universities. Six hundred questionnaires were retrieved (response rate of 92.2%. An exploratory factor analysis was used to understand the responses and the interrelationships. The results showed a two-factor solution of ‘locational advantages and user needs’ and ‘adequacy of facilities/functional connection and four core determinants for acceptance. It is concluded that universities should factor student-staff focus points into their facilities planning schemes to optimise their service deliveries. The study contributes to the discussion on factor structure of sustainable facilities planning scale with a focus on students and staff of universities.   Keywords: Facilities planning, universities, data structure, factors, Nigeria.

  13. Quality Management Plan for the Environmental Assessment and Innovation Division

    Science.gov (United States)

    Quality management plan (QMP) which identifies the mission, roles, responsibilities of personnel with regard to quality assurance and quality management for the environmental assessment and innovation division.

  14. River Protection Project (RPP) Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    NAVARRO, J.E.

    2001-03-07

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  15. Managerial issues in facilities management: The impact of facilities service on student productivity

    DEFF Research Database (Denmark)

    Holzweber, Markus

    2017-01-01

    The study examines key issues and effects of managerial capability management in higher education premises at the University of Glasgow. A study was undertaken on the library’s ‘Learning Cafe’ area. This unique learning space provides complex process-oriented facilities- and IT services to students...

  16. Trusted Computing Exemplar: Life Cycle Management Plan

    Science.gov (United States)

    2014-12-12

    Informal “An informal specification is written as prose in natural language...(e.g., Dutch, English, French, German). An informal specification is not...informal) prose . The restricted syntax language may be a natural language with restricted sentence structure and keywords with special meaning, or it may...accompanied by supporting explanatory (informal) prose .” [4] TCX: Life Cycle Management Plan NPS-CAG-14-002 4 2 Life Cycle Phases and Activities

  17. Remote sensing for land management and planning

    Science.gov (United States)

    Woodcock, Curtis E.; Strahler, Alan H.; Franklin, Janet

    1983-05-01

    The primary role of remote sensing in land management and planning has been to provide information concerning the physical characteristics of the land which influence the management of individual land parcels or the allocation of lands to various uses These physical characteristics have typically been assessed through aerial photography, which is used to develop resource maps and to monitor changing environmental conditions These uses are well developed and currently well integrated into the planning infrastructure at local, state, and federal levels in the United States. Many newly emerging uses of remote sensing involve digital images which are collected, stored, and processed automatically by electromechanical scanning devices and electronic computers Some scanning devices operate from aircraft or spacecraft to scan ground scenes directly; others scan conventional aerial transparencies to yield digital images. Digital imagery offers the potential for computer-based automated map production, a process that can significantly increase the amount and timeliness of information available to land managers and planners. Future uses of remote sensing in land planning and management will involve geographic information systems, which store resource information in a geocoded format. Geographic information systems allow the automated integration of disparate types of resource data through various types of spatial models so that with accompanying sample ground data, information in the form of thematic maps and/ or aerially aggregated statistics can be produced Key issues confronting the development and integration of geographic information systems into planning pathways are restoration and rectification of digital images, automated techniques for combining both quantitative and qualitative types of data in information-extracting procedures, and the compatibility of alternative data storage modes

  18. Geographic access to family planning facilities and the risk of unintended and teenage pregnancy.

    Science.gov (United States)

    Goodman, David C; Klerman, Lorraine V; Johnson, Kay A; Chang, Chiang-Hua; Marth, Nancy

    2007-03-01

    This study tested the hypotheses that greater geographic access to family planning facilities is associated with lower rates of unintended and teenage pregnancies. State Pregnancy Risk Assessment Monitoring System (PRAMS) and natality files in four states were used to locate unintended and teenage births, respectively. Geographic availability was measured by cohort travel time to the nearest family planning facility, the presence of a family planning facility in a ZIP area, and the supply of primary care physicians and obstetric-gynecologists. 83% of the PRAMS cohort and 80% of teenagers lived within 15 min or less of a facility and virtually none lived more than 30 min. Adjusted odds ratios did not demonstrate a statistically significant trend to a higher risk of unintended pregnancies with longer travel time. Similarly there was no association with unintended pregnancy and the presence of a family planning facility within the ZIP area of maternal residence, or with the supply of physicians capable of providing family planning services. Both crude and adjusted relative rates of teenage pregnancies were significantly lower with further distance from family planning sites and with the absence of a facility in the ZIP area of residence. In adjusted models, the supply of obstetricians-gynecologists and primary care physicians was not significantly associated with decreased teen pregnancies. This study found no relationship between greater geographic availability of family planning facilities and a risk of unintended pregnancies. Greater geographic availability of family planning services was associated with a higher risk of teenage pregnancy, although these results may be confounded by facilities locating in areas with greater family planning needs.

  19. Management of Excess Material in the Navys Real Time Reutilization Asset Management Facilities Needs Improvement

    Science.gov (United States)

    2017-01-23

    also own material in the RRAM facilities. NAVSUP procures and supplies the parts, components , and assemblies that keep Navy forces mission ready. In...No. DODIG-2017-043 J A N U A R Y 2 3 , 2 0 1 7 Management of Excess Material in the Navy’s Real-Time Reutilization Asset Management Facilities...Management of Excess Material in the Navy’s Real‑Time Reutilization Asset Management Facilities Needs Improvement Visit us at www.dodig.mil January 23, 2017

  20. Resources planning for radiological incidents management

    Science.gov (United States)

    Hamid, Amy Hamijah binti Ab.; Rozan, Mohd Zaidi Abd; Ibrahim, Roliana; Deris, Safaai; Yunus, Muhd. Noor Muhd.

    2017-01-01

    Disastrous radiation and nuclear meltdown require an intricate scale of emergency health and social care capacity planning framework. In Malaysia, multiple agencies are responsible for implementing radiological and nuclear safety and security. This research project focused on the Radiological Trauma Triage (RTT) System. This system applies patient's classification based on their injury and level of radiation sickness. This classification prioritizes on the diagnostic and treatment of the casualties which include resources estimation of the medical delivery system supply and demand. Also, this system consists of the leading rescue agency organization and disaster coordinator, as well as the technical support and radiological medical response teams. This research implemented and developed the resources planning simulator for radiological incidents management. The objective of the simulator is to assist the authorities in planning their resources while managing the radiological incidents within the Internal Treatment Area (ITA), Reception Area Treatment (RAT) and Hospital Care Treatment (HCT) phases. The majority (75%) of the stakeholders and experts, who had been interviewed, witnessed and accepted that the simulator would be effective to resolve various types of disaster and resources management issues.